Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout187-093 • • From: Patricia Bettis To: Well History File: PTD 187-093 Date: January 13, 2017 Re: Well Name Change At the request of Hilcorp, the well name for MGS A23-01R was changed to MGS A23-01RD, effective January 13, 2017. S8) j \N Zd1T Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning. They are available in the original file, may be scanned during the rescan activity or are viewable by direct inspection of the file. ~- (~ rZ- 0 ~ Well History File Identifier Organization (done) /~ Two-Sided RESCAN DIGITAL DATA [] Color items: [] Diskettes, No.  items: [] Other, Grayscale No/Type [] Poor Quality Originals: / [] Other: TOTAL PAGES: /~/ NOTES: ORGANIZED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other Is~ Project Proofing [] Staff Proof By: Date: PROOFED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /s/ Scanned (done) SCANNED BY: ~BREN VINCENT SHERYL MARIA LOWELL /SI RESCANNEDBY: BEVERLY BREN VIN~ARIA General Notes or Comments about this file: PAGES' LOWELL DATE: Quality Checked (done) . . MGS FIELD WELLS CHANGE WELL STATUS FOR WELLS WITH LATERALS FEBRUARY 16, 2006 The following wells status was changed from SQZED to I-OIL. These wells had laterals drilled against them and production was assigned to all laterals in Cook Inlet when the wells were first drilled. Since then, AOGCC changed the policy about lateral wells and assigning production against lateral API numbers. This policy is like the lateral wells on the North Slope. Today I notice wells producing in the MGS field with a status not conducive to the well status and changed it to I-OIL. All the wells show oil production over the years. The status date reverted back to the date the well was completed as an oil well. The following wells were corrected: MGS A12-0l MGS A13-0l MGS A14-0l MGS A22-l4 MGS A23-0lR MGS A3l-l4 MGS A4l-ll PERMIT 177-055 PERMIT 166-015 PERMIT 167-079 PERMIT 185-068 PERMIT 187-093 PERMIT 177-031 PERMIT 185-174 ~t,;ß~~~\~t:.L -; C .c... All production has been assigned back to the original well API number, no production is assigned to a lateral well API number. '$j ~ 1/1 /J l11J :-. jA~ I Ht J j ~M1<J¿J i , DISPOSAL WELL January-99 A34-14 A4 IA-I ILN A44-11 Al i-13R2 Al lol2 A23-01R Al2-12 A33-14 ~ }~ ~ !i !!i! ?~iiiiiii INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU ISJ INJ ANNU INJ INJ ANNU INJ INJ ANNU 0 l-Jan-99 767 3600 50 1299 3550 0 0 50 59 45 3600 60 430 3600 25 t 187 3600 3351] 0 0 0 468 3600 80 02oJan-99 710 3600 50 1228 3550 0 0 50 59 45 3600 60 411 3600 25 1065 3600 3350 0 0 0 432 3600 80 03-Jano99 771 3600 50 1261 3600 O 0 50 59 44 3600 60 449 3600 25 1111 3600 3350 0 0 0 500 3600 80 04-Jan-99 779 3600 50 1273 3600 0 0 50 59 45 3600 60 459 3600 25 1116 3600 3350 0 0 0 504 3600 80 05-Jan-99 762 3600 50 1244 3600 0 0 50 59 38 3600 60 449 3600 25 1088 3600 3350 0 0 0 491 3600 80 06-Jan-99 764 3600 50 1245 3600 0 0 50 59 38 3600 60 449 3600 25 1089 3600 3350 0 0 0 490 3600 80 07-Jan-99 758 3600 45 1240 3500 0 0 50 59 33 3600 60 446 3600 25 1083 3600 3400 0 0 0 497 3600 40 08-Jan-99 768 3600 45 1249 3500 0 0 50 55 38 3600 60 451 3600 25 1092 3600 3420 0 0 0 497 3600 40 09-Jan-99 761 3600 45 1239 3500 (] 0 50 55 39 3600 55 446 3600 20 1084 3600 3425 0 0 0 489 3600 45 10-Jan-99 758 3600 45 1237 3500 0 0 52 60 38 3600 60 443 3600 20 1079 3600 3425 0 0 0 485 3600 50 I l-Jan-99 748 3600 45 1223 3500 0 0 52 60 34 3600 60 436 3600 25 1068 3600 3425 0 0 0 479 3600 50 12-Jan-99 754 3600 45 1236 3500 0 0 52 61 41 3600 60 439 3600 25 1078 3600 3450 0 0 0 484 3600 55 13-Jan-99 770 3600 50 1255 3600 0 0 52 62 49 3600 60 462 3600 25 1112 3600 3450 0 0 0 529 3600 0 14-Jan-99 795 3600 50 1272 3500 0 0 52 62 53 3600 60 488 3600 50 1139 3600 3450 0 0 01 570 3600 15 15-Jan-99 792 3600 50 1268 3550 0 0 52 62 47 3600 60 487 3600 25 1134 3600 3450 0 0 (3 562 3600 20 16-Jan-99 754 3600 50 1234 3500 0 0 52 62 38 3600 60 460 3600 50 1087 3600 3400 0 0 (3 500 3600 80 17-Jan-99 830 3600 50 1281 3550 0 0 52 58 33 3600 60 501 3600 50 1156 3600 3450 0 0 0 589 3600 20 18-Jan-99 804 3600 50 1262 3550 0 0 52 60 33 3600 60 487 3600 50 1125 3600 3450 0 0 0 541 3600 40 19-Jan-99 784 3600 50 1241 3500 0 0 52 60 27 3600 60 470 3600 50 1102 3600 3450 0 0 0 514 3600 45 20-Jan-99 792 3600 50 1250 3500 0 0 52 60 32 3600 60 472 3600 50 1109 3600 3450 0 0 0 523 3600 40 21-Jan-99 784 3600 55 1237 3500 0 0 52 59 34 3600 60 467 3600 25 1104 3600 3450 0 0 0 523 3600 4¢ 22-Jan-99 804 3600 55 1266 3500 0 0 52 59 35 3600 60 477 3600 25 1120 3600 3450 0 0 0 533 3600 45I 23-Jan-99 779 3600 55 1236 3500 0 0 52 59i 37 3600 60 463 3600 25 1100 3600 3450 0 0 0 519 3600 24-Jan-99 771 3600 55, 1235 3500 0 0 52 581 38 3600 60 453 3600 25 1087 3600 3450 0 0 0 501 3600 25-Jan-99 786 3600 55: 1247 3500 0 0 52 58 36 3600 65 445 3600 25 1105 3600 3450 0 0 0 518 3600 55 26-Jan-99 780 3600 55~ 1237 3500 0 0 52 57 41 3600 65 452 3600 25 1099 3600 3450 0 0 0 520 3600 27-Jan-99 785 3600 551 1250 3500 ~ 0 0 52 58 40 3600 65 456 3600 25 1 t03 3600 3450 0 0 0 519 3600 55 28-Jan-99 783 3600 60! 1229 3500 0 0 52 58 47 3600 60 450 3600 25 1094 3600 3575 0 0 0 518 3600 50 29-$an-99 796 3600 601 1245 3500 0 0 52 58 47 3600 60 460 3600 25 1108 3600 3450 0 0 0 536 3600 50 30-Jan-99 792 3600 6(3 1243 3500 0 0 52 58 52 3600 60 460 3600 25 1107 3600 3450 0 0 0 530 3600 50 3 l-Jan-99 813 3600 60 1262 3500 0 0 52 58 52 3600 60 472 3600 25 1128 3600 3450 0 0 0 560 3600 50 TOTAL 24,094 38,724 0 1,249 14,190 34,259 0 15,911 MAXIMUM 3,600 60 3,600 0 52 62 3,600 65 3,600 50 3,600 3,575 0 0 3,600 80 AVERAGE 777 3,600 51 1,249 3,524 0 0 51 59 40 3,600 60 458 3,600 30 1,105 3,600 3,428 0 0 0 513 3,600 51 # DAYS 31 31 0 31 31 31 0 31 02/10/99 ..... SCANNF-D DEC 1 9 2002 A chora:'!e, February-99 ] 02-Feb-99 [ 03-Feb-99 04-Feb-99 05-Feb-99 06-Feb-99 07-Feb-99 O8-Feb-99 09-Feb-99 10-Feb-99 ! l-Feb-99 12-Feb-99 13-Feb-99 14-Feb-99 15 - Feb-99 16-Feb-99 17-Feb-99 1 g-Feb-99 ! 9-Feb-99 20-Feb-99 21 -Feb-99 22-Feb-99 23-Feb-99 24-Feb-99 25-Feb-99 26-Feb-99 27-Feb-99 28-Feb-99 TOTAL MAXIMUM AVERAGE # DAYS 03/08/99 I A34-14 I A41A-I ILN ! A~T I [ I ACT INJ ] INJ [ANNUl INJ ] INJ IANNU 743 3600 501 1253 3500 0 796 3600 501 1248 3500 0 779 3550 501 1223 3500 0 WATER INJECTION REPORT PLATFORM A DISPOSA L WELL A44- I 1 0 52 58 Al 1-13R2 53 3600 60 AIl-12 421 3600 25 A23-0 i R 1135 3600 3451~ A12-12 0 0 791 3550 50! 781 3550 50 783 3575 50 781 3600 50 781 3575 50 780 3600 50 799 3600 50 802 3600 50 797 3600 50 811 360O 50' 821 3600 50' 816 3600 50 810 3600 5C 811 3600 50 800 3600 5C 826 3600 55 812 3600 55 810 3600 55 754 3600 55 876 3600 55 813 3600 55 812 3600 50 812 3600 50 809 3600 50 816 3600 50 22,422 3,600 801 3,593 51 28 1243 3500 0 1231 3500 0 1237 3500 0 1228 3500 0 1231 3500 0 1221 35OO 0 1239 3525 0 1236 3550 0 1234 3550 0 1248 3550 0 1251 3550 0 1255 3550 0 1244 3550 0 1242 3550 0 1225 3550 0 1263 3550 0 1237 3550 0 1237 3550 0 1151 .3550 0 1335 355O 0 1240 3550 0 1240 3550 0 1238 3550 0 1236 3550 0 1239 3550 0 0 52 58 0 52 56 0 50 56 0 50 57 0 50 58 0 50 58 0 50 58 0 50 59, 0 50 5~ 0 50 54 0 50 60 0 50 60 0 50 60 0 50 60 0 50 62 0 5O 62 0 50 62 0 50 62 0 50 59 0 50 61 0 50 62 0 50 63 0 50 63 0 50 63 0 50 63 0 50 63 0 50 63 34,705 3,550 0 1,239 3,533 0 28 0 52 63 0 50 60 0 52 3600 60 53 3550 60 52 3550 60 49 3550 65 46 3575 65 47 3600 65 4O 3575 65 42 3600 65 44 3600 65 44 3600 65 44 3600 60 43 3600 65 55 3600 65 67 3600 70 461 3600 25 450 3550 25 458 3550 452 3550 15 452 3575 25 450 3600 25 450 3575 25 450 3600 25 460 3600 25 463 3600 5¢ 460 3600 5C 468 3600 5~ 478 3600 50 477 3600 5~ 1111 3600 3450 1088 3600 3450 1105 3550 3430 1094 3600 3440 1093 3600 3440 I090 3600 3440 1091 3575 3440 1088 3550 3440 1109 3550 3440 1110 3550 3450 1107 3550 3450 1123 3550 3450 !!30 3600 3500' 1129 3600 3475 56 3600 70 54 3600 70 43 3600 70 40 3600 70 44 360O 65 55 360O 65 38 3600 65 43 3600 70 38 3600 70 42 3600 70 47 3600 70 49 3600 7O 58 3600 70 1,338 3,600 70 48 3,593 66 28 471 3600 50 470 3600 50 462 3600 50 476 3600 50 467 3600 50 465 3600 50 431 3600 50 501 360O 50 466 3600 50 466 3600 50 465 3600 50 465 3600 50 468 3600 50 12,923 3,600 50 462 3,593 40 28 1119 3600 3475 1119 3600 3500 1102 3600 3500 !i39 3600 3500 1117 ~ 3650 350¢ 11!5 3650 350( 1037 ' 3650 350( 1205 3650 3500 1118 3650 3500 1118 3650 3500 1114 3650 3500 1113 3650 3500 1118 3650 3500 31,137 3,650 3,500 1,112 3,604 3,472 28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0- 0 . 0 0 A33-14 0 ' 5~8 3600 ' 50I 0 532 3600 50~ 0 518 3550 50I 0 526 3550 50I 0 520 3550 50 0 516 3575 55 0 515 36O0 60 0 515 3600 60 0 516 36O0 60 0 540 3600 55 0 545 3600 40 0 538 3600 5O 0 563 3600' 50: 0 578 3600 3C 0 569 3600 35 0 561 3600 50 01 563 3600 40 0 550 3600 45 I 569 3600 45 560 3600 40 0i 555 3600 45  515 3600 45 600 3600 50 560 3600 558 3600 50 558 36OO 5O 553 3600 50 563 3600 50 15,284 3,600 60 546 '3,594 48 28 SGANNED DEl3 1. 9 2002 DISPOSAL WELL March-99 A34-14 A4 IA-I ILN A44-11 Al 1-13R2 Al 1-12 A23-01R A12-12 A33-14 ~ i~ ~iiii} i!iiiiii INJ INJ ANNU ISJ INJ ANNU INJ ISJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU ISJ ImJ ANNU ISJ INJ ANNU 01oMar-99 811 3600 50 1239 3550 0 0 50 63! 54 3600 70 466 3600 50 1114 3650 3500 0 0 0 558 3600 50 02-Mar-99 813 3600 50 1247 3550 0 0 50 63 44 3600 70 468 3600 50 1119 3650 3500 0 0 0 556 3600 50 03-Mar-99 801 3600 50 1225 3550 0 0 50 63 45 3600 70 459 3600 50 1098 3650 3500 0 0 0 549 3600 60 04-Mar-99 806 3600 55 1231 3550 0 0 50 63 50 3600 70 462 3600 40 1110 3600 3475 0 0 0 554 3600 50 05-Mar-99 806 3600 60 1229 3550 0 0 50 64 59 3600 70 456 3600 25 I108 3600 3450 0 0 0 556 3600 50 06-Mar-99 811 3600 60 1236 3550 0 0 50 62 59 3600 70 457 3600 50 1111 3600 3500 0 0 0 558 3600 50 07-Mar-99 848 3600 55 1269 3550 0 0 50 62 58 3600 70 488 3600 50 1147 3600 3500 0 0 0 600 3600 35 08-Mar-99 821 3600 60 1223 3550 0 0 50 64 60 3600 70 477 3600 50 1112 3600 3500 0 0 0 578 3600 40 09-Mar-99 846 3600 55 1252 3550 0 0 50 63 60 3600 70 492 3600 50 1140 3600 3500 0 0 0 604 3600 35 10-Mar-99 839 3600 55 1255 3550 0 0 50 63 61 3600 70 489 3600 50 1138 3600 3500 0 0 0 595 3600 40 Il-Mar-99 806 3600 55 1231 3550 0 0 50 63 50 3600 70 462 3600 40 1110 3600 3475 0 0 0 554 3600 50 12-Mar-99 815 3600 50 1235 3550 0 0 50 64 58 3600 70 472 3600 50 1112 3600 3500 0 0 0 560 3600 65 13-Mar-99 820 3600 50 1232 3550 0 0 50 65 53 3600 70 471 3600 50 1113 3600 3500 0 0 0 567 3600 65: 14-Mar-99 819 3600 50 1230 3550 0 0 50 66 61 3600 70 470 3600 50 1106 3600 3500 0 0 0 563 3600 6¢ 15-Mar-99 818 3600 50 1244 3550 0 0 50 64 58 3600 701 476 3600 50 1119 3600 3500 0 0 0 574 3600 60 16-Mar-99 816 3600 50 1215 3550 0 0 50 66 52 3600 70 466 3600 50 1099 3600 3500 0 0 0 564 3600 6C 17-Mar-99 819 3600 50 1217 3550 0 0 50 63 56 3600 70 470 3600 50 11t6 3600 3500 0 0 0 579 3600 5C 18-Mar-99 837 3600 50 1240 3550 0 0 50 60 61 3600 65 482 3600 50 1133 3600 3500 0 0 0 590 3600 45 19-Mar-99 808 3600 55 1207 3550 0 0 50 62 62 3600 65 463 3600 50 1097 3600 3500 0 0 0 561, 3600 55 20-Mar-99 813 3600 55 1219 3550 0; 0 50 62 58 3600 65 466 3600 50 1106 3600 3500 0 0 0 559 3600 60 21-Mar-99 806 3600 55 1207 3550 01 0 50 62 53 3600 65 461 3600 50 1095 3600 3500 0 0 0 558 3600 60 22-Mar-99 818 3600 55 1222 3550 0 0 50 62: 55 3600 65 468 3600 50 1110 3600 3500 0 0 Q 571 3600 60 23-Mar-99 806 3600 55 1206 3550 0 0 50 ~' 57 3600 65 464 3600 50 1093 3600 3500 0 0 0i 560 3600 65 2n-Mar-99 822 3600 55 1228 3550 0 0 50 54 3600 70 472 3600 501 1113 3600 3500 0 0 0' 574 3600 65 25-Mar-99 809 3700 60 1217 3700 0 0 50 67 61 3700 70 462 3700 50 1098 3700 3495 0 0 0 560 3700 65 26-Mar-99 811 3600 55 1215 3550 0 0 55 64 55 3650 70 461 3600 50 1097 3650 3495 0 0 0 562 3600 65 27-Mar-99 810 3600 60 1214 3550 0 0 52 66 52 3625 70 459 3600 50 1098 3650 349t 0 0 0 565 3600 60 28-Mar-99 815 3600 55 1220 3550 0 0 55 65 52 3625 70 461 3600 50 1103 3650 3500 0 0 0 574 3600 55 29-Mar-99 813 3600 60 1217 3550 0 0 55 62 55 3625 65 460 3600 50 1101 3650 3495 0 0 0 572 3600 55 30-Mar-99 814 3600 55 1218 3550 0 0 55 65 52 3625 70 460 3600 50 1103 3650 3495 0 0 0 574 3600 55 31-Mar-99 816 3600 55 1225 3550 0 0 55 67 52 3625 70 460 3600 50 1104 3650 3495 0 0 0 572 3600 50 TOTAL 25,313 38,065 0 1,717 14,500 34,423 0 17,621 MAXIMUM 3,700 60i 3,700 0 55 67 3,700 70 3,700 50 3,700 3,500 0 0 3,700 65 AVERAGE 817 3,603 54 1,228 3,555 0 0 51 64 55 3,609 69 468 3,603 49 1,110 3,618 3,496 0 0 0 568 3,603 54 # DAYS 31 31 0 31 31 31 0 31 04/08/99 $C NE D DE C 1 9 2002 PLUGGi~YG = LO~%TION CLE.~_R~CE RRPORT Sta~a cf A!ask~ ALAS~ 0iL & GAS CTNSEKV~TION CCHHISSION - We ~ ~ Name Lcc--- =icn Review ~h~e well file, a.~i,' c~-~-.~: on pluq~g, well head s=a:=s, ~ !oca:i:n clea~ce~- pr~de loc. clear, co~e. Well hear =a= c~f: conclusions: "-'" STATE OF ALASKA -- ALASKA OIL AND'GAS CONSERVATION C J VIMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification oi Service Wel OIL: GAS: SUSPENDED: % ABANDONED: X SERVICE: , ,, 2. Name of Operate 7. Permit Numbej XTO Energy, Inc. 201-073 3. Address 8. APi N~mber 3000 N. Garfield, Suite 175, Midland, Texas 7970 50- 733-20238-01 ,' *,,, . ,-,, ~ 9. Unit or LeaseNam~ 4. Location of well at surfac, ~ ~.,~¢,.~¥~.,~:~,~ ~. 1569' FSL, 381' FEL, Sec. 11, T8N, R13W, Seward Meridia,~ ;~~~, ~ Middle Ground Shoe At Top Producing lnte~a ~ ~ ~ 10. WelINumbe~ 1554' FSL, 2099' FWL, Sec. 1, T8N, R13W, SM,~.._,~~ A23-01RD At Total Dept~ ¢ ;:'~. 11. Field and Poe 2611' FSL, 1742' FWL, Sec. 1, T8N, R13W, SM ..... ¢,,~.: ......... .... 5. Elevation in feet (indicate KB, DF, etc. 6. Lease Designation and Serial N( Middle Ground Shoe 116' DF ADL 18754 ..... 12. Date Spudded3/25/1972 13' Date T'D' Reached I 14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °fish°re I 16' N°' °f C°mpleti°nSS/31/1972 5/19/2001 80 feet MSL 0 17' T°tal Depth (MD+TVD) 18' Plug Back Depth (MD+TVD) I 19' Directi°nal Su~ey 20' Depth where SSSV set I 21' Thickn°~ °f Permafr°stl 1,550' / 8,821' 9,579' / 7,317' Yes: No: NA feet MD NA 22. Type Electric or Other Logs Rut 23. CASING, LINER AND CEMENTING RECORD S~ING DEPTH MD CASING SIZE ~. PER ~. G~DE TOP BO~OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 61¢ J-55 0 2,393' 17-1/2" 1940 sx 0 9-5/8" 47¢ N-80 0 8,080' 12-1/4" 1200 sx 0 7" 26¢ N-80 0 9,989' 8" 0 , , 7" 32~ P-110 9,989' 11 ,~8' 8" 980 sx 0 24. Pedora~ons open to Production (M~TVD of Top and Bo~om ar 25. TUBING RECORD inte~al, size and number SIZE DEPTH S~ (MD) PACKER S~ (MD) 26. ACID, F~CTU~E, CEMENT SQUEEZE, ~C. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Productior ~ Method of Operation (Flowing, gas liE, etc I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ] GAS-OIL ~TIO TEST PERIOD => 0 0 0 NA~ NA Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVIS-APl (corr) Press. 0 0 24-HOUR RATE => 0 0 0 NA 28. CORE DATA Brief description of lithology, porosi~, frac~res, apparent dips and presen~ of oil, gas or water. Submit core chi None Alaska 0il & (Sss Cons. Anch0rage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate GEOLOGIC MARKERS ' ' FoR-~ATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravit) MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ,; ~1. LIST OF A'I-I'ACHMENTS · Summary of Rig Workover Operation.. 3~. ' '1 hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~// ~/~ _ ..~_ _?~_/ Title Drillinq Manaqer Date / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log o all types of lands and leases in Alaska Item 1: Classitication of Service Wells: Gas injection, water injection, steam injection, air injection, sal water disposal, water supply for injection, observation, injection for in-situ combustior Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurement. given in other space on this form and in any attachments Item 16 and 24: If this well is completed for separate production from more than one interval (multiph completion), so state in item 16, and in item 24 show the productin intervals for only the interval reporte in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interv~ Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.) Item 23: Attached supplemental records for this well should show the details of any multiple stage cemenl lng and the location of the cementing tool Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In. jection, Gas Injection, Shut-in, Other-explain Item 28: If no cores taken, indicate "none" Form 10-407 XTO Energy Well No. A23-01RD Well Operations Summary 0600, 5/10/01 -0600, 5/11/01 MW: 11.2 ppg Vis: 40 sec Bleed/Well Annulus to production. Mix kill WT mud to 11.2 ppg. Rig up to bullhead/kill well- annulus& tubing - 650 psi. Bullhead 105 bbls 11.2 ppg mud down tubing to perforations at 1 bpm. Monitor well & bleed/4 bbls from tubing (751 psi to 0) - Bleed annulus to production 180 psi. Bullhead 40 more bbls of 11.2 ppg mud to bottom perforations. Monitor well. Bleed 10 bbls from tubing - tubing=0. Bleed annulus to production. Monitor well. Shut-in annulus. Initial shut in pressure=380 psi. Tubing=25 psi. Bleed to 0 w/1 bbl. Rig up to install BPV. Tubing went to 270 psi and annulus to 480 psi. Bullhead 20 bbls down tubing. Monitor well. Bleed tubing 5 bbls to 0 psi. Bleed annulus to production at 140 psi. Tubing built to 87 psi. 0600, 5/11/01 - 0600, 5/12/01 MW: 11.4 ppg Vis: 43 sec Monitor well, tubing=170 psi, annulus=480psi. Rig up choke & 2" line to production. Pump 70 bbls mud down tubing & took returns to production until mud returned. Monitor well, not dead. Rig up APRS wireline & run in hole w/1 9/16" 2 feet perf gun. Work down thru scale to 9,551 '. WLM & Perf form 9549' to 9551' 2 x 4hpf (3/8"). Pull out of hole & rig down APRS. Pump 11.2 ppg mud down tubing & take returns to pits. 9.6 ppg watered down mud with no H2S. Pumped calculated annulus volume of 256 bbls. Got 11.2 mud back with 190 bbls pumped. Monitor well. Tubing built to 125 psi and annulus to 220 psi. Raise mud wt to 11.4 ppg. Pump 11.4 ppg mud around calculated annulus. Monitor well. Tubing 150 psi & annulus 220 psi. Bullhead 90 bbls 11.4 ppg mud down tubing. Monitor well. Tubing bled bom 1,400 psi to 850. Hold. Bled tubing to 0, also annulus. Monitor well. 0600, 5/12/01-0600, 5/13/01 MW: 12.0 ppg Vis: 41 sec Continue to monitor well and bleed tubing and annulus periodically. Seems to be worse than with lower xvt mud. Well not stable. Monitor well & wt up to 12 ppg. Circulate 12 ppg mud around calculated volume from 9,550' shot holes. Monitor well and bleed same. Tubing will build to 300 psi & annulus to 70 psi. Well will not stabilize. Bullhead 12 ppg mud to bottom perforations. Monitor well while shut-in. Bled from 1,765 psi to LISIP of 845 psi tubing & 920 psi annulus to 100 psi tubing & 200 psi annulus & stabilized. Open well & 0 psi tubing & 40 psi annulus. Well dead & stable. Rig up circulation JT & prep tree for BPV. Clean out tree with CIW hand. Very bad scale has tree clogged up & master valve washed out. Clean out to BPV profile & attempt set BPV. No go. Attempt clean out BPV threads with BPV tap. Discover BPV profile washed out. Prep to run slickline tubing plug. Will have to broach & gauge ring to even get to tubing. Records show this was done in 96 to replace washed out master valve (now washed out again). Will attempt to get to x nipple profile ~ 304' & set PX plug. If not will attempt to set "D" plug in tubing. 0600, 5/13/01 -0600, 5/14/01 MW: 12.0 ppg Vis: 45 sec Prep and rig up slickline unit & wait on slickline personnel & tools & joint of 3 ½" 8 round for riser. Run in hole with 2.74" broach to 150 feet. Pull out of hole & run in hole with scratcher to 150 feet. Pull out of hole. Run in hole with tubing "D" plug & attempt to set in tubing. No go. Pull out of hole. Run in hole with 2.74" broach to 312 feet. Pull out of hole. Run in hole with scratcher to 312 feet. Pull out of hole. Run in hole with 2.75" PX plug & attempt to set in X nipple profile ~ 304 feet. No go. Pull out of hole. Run in hole with braided line scratcher to 312 feet. Brushing out profile ~304 feet. Pull out of hole. Run in hole with 2.75 "PX plug & set in X nipple profile ~ 304 feet. Pull out of hole. Run in hole with PX prong & set in PX plug ~ 303 feet. Pull out of hole. Pressure test PX plug to 1500 psi, OK- good test. Rig down slickline unit. Nipple down tree. Clean & prep hanger (BPVs threads washed out). Weld 2 feet 3 ½" 8 round pup to hanger & make up solid plug block to pup. Set & nipple up riser & nipple up BOPE. 0600, 5/14/01-0600, 5/15/01 MW: 12.0 ppg Vis: 43 sec Nipple up / nipple down BOP/diverter. Test BOPs / diverter 250/5000 psi (annular 250/5000 psi). Good test including blinds. Rig up slickline & run in hole with 2 ½" JDC to 304 feet & pull PX prong. Pull out of hole. Run in hole w/3 ½" GS to 304 feet & pull 2.75" PX plug. Pull out of hole. Rig down slickline. Run in hole & spear tubing, block out lock downs & pull hanger & tubing to rig floor. Could see seals come out ofpacker. Pull 165k. Break down spear assembly & hanger. Rig up tongs. Lay down hanger & circulate well - 9.6 ppg to 9.9ppg. Weight up and even out mud weight to 12 ppg. Pump dry job. Pull out of hole & lay down 3 ½" completion - 46 joints @ 0600 Hrs. Tubing looks pretty fair so far (tight threads). At 44 joints, lots of scale inside tubing. 0600, 5/15/01-0600, 5/16/01 MW: 12.3 ppg Vis: 41 sec Continue pull out of hole & lay down 3 ½" completion. Mix and pump dry job. Pull out of hole & lay down 3 ½" completion. Big holes in 3 joints ~ +/- 3,403' to 3,495'. ½" chunks of scale from inside tubing starting ~ 1,400'. Lay down total of 307 joints, 2-X nipples & seal assembly. Install wear ring. Pick up Baker cement retainer, run in hole & pick up 3 ½" DP.. Tag packer ~ 9689' DPM. Pick up & set Baker cement retainer ~ 9,684' DPM. 0600, 5/16/01 -0600, 5/17/01 MW: 12.1 ppg Vis: 41 sec Circulate and condition mud. Rig up BJ. Back load & unload boat. Sting into retainer. Attempt to pump into formation ~ 3500 psi. Unsting & sting into retainer many times with & without pump. Pressure up to 5000 psi. Pressure would leak off ~ 100 psi per minute. Blow down and rig down BJ cementers. Pump dry job. Pull out of hole. Lay down stinger (no damage to stinger). Strap & pick up 9-4 %" DC's, jars & 6" metal muncher mill. Run in hole. Mill up retainer ~ 9,684'. Circulate. Close rams pressure up on formation to 2200 psi. Broke down and pumped away ~ 2000 psi ~ 2 bpm. Circulate bottoms up. 0600, 5/1701-0600, 5/18/01 MW: 12.1 ppg Vis: 42 sec Pull out of hole with 6" metal muncher mill. Lay down mill & jars, stand back collars. Rig up and run Baker 7" cement retainer on electric line. Tight spot ~1,650'. Would not go below 2,186'. Pull out of hole with retainer. Service rig, top drive, & iron roughneck. Make up 7" Baker cement retainer on drilling pipe. Run in hole, tag ~ 9,682'. Circulate around retainer. Close rams, attempt to pump away. No go. Pressure test CSG to 3000 psi- good test. Set retainer ~ 9,679'. Attempt to pump into perforations several times with pressure up to 5000 psi, (was given a waiver by Tom Maunder with AOGCC to lay 100' cement plug on top of retainer). Pull out ofretainer ~ 9,679' & lay a balanced cement plug. 8 bbl water, 6 bbl 16.4 ppg cement, 2 bbl water. Displaced with 59 bbl mud. Cement in place ~ 0030. Pull 3 stands to 9398'. Reverse circulate. Pull out of hole. Install stab in guide on top drive. Lay down Baker cement retainer running tool. Prepare to pick up 6" bit & CSG scraper. 0600, 5/18/01-0600, 05/19/01 MW: 12.1 ppg Vis: 40 sec Pick up 6" bit and scraper, run in hole. Cameron tested 7" pack off & slips in well head - Good Test. Run in hole (slow) to 9,398'. Circulate hole. Clean out cement stringers & dress top of cement t~om 9,500' to 9,579'. Circulate bottoms up - work CGS scraper through bridge plug seat. Pull out of hole with bit & scraper. Lay down 6" bit & scraper - pick up Baker bridge plug. Slip & cut drill line. Run in hole (slow) with bridge plug. Break circulation - tag cement - drop ball- set baker bridge plug ~ 9,572'. Pump pill. Pull out of hole with running tool. Repair top drive ram. Re: X~TOE Well A23-01LW Decompletion Subject: Date: From: To: CC: Re: XTOE Well A23-01LW Decompletion Fri, 18 May 2001 13:54:24 -0700 Tom Maunder <tom_maunder@admin.state.ak. us> Bill Penrose <bill@fairweather. com> "Bobby Smith (E-mail)" <bobby_smith@crosstimbers.com>, "Doug Schultze (E-mail)" <Doug_Schultze@crosstimbers.com>, "Doug Marshall (E-mail)" <marshall@sarcomgs.com>, "XTOC Drlg Platforms (E-mail)" <drilling@sarcomgs.com> Bill, Not a problem with the call. I well know that it usually needs to be nearly dark for anything important to happen, especially if it concerns cement. Very interesting regarding the problems with pumping through the retainer(s). This reply confirms our discussion and my approval for you to cap the retainer with cement due to the difficulties pumping into it. Good luck with the remainder of the project. Tom Maunder, PE Petroleum Engineer AOGCC Bill Penrose wrote: ;> :> ;> :> Before I start, please note that Cross Timbers Oil Company has changed their name to XTO Energy and I'll be referring to them as XTOE or just XTO in the future. Per your request, this is to summarize the modified perforation abandonment procedure for Well A23-OILW and the reasons for it. The original intent was to use the tubing in the well to inject cement below the permanent production packer to abandon the perfs. The tubing could then be pulled and the well sidetracked. Unfortunately, the tubing had ho/es in it at -3400' and could not be used for cementing. The well was killed, the tubing pulled and an EZ-Drill retainer run on drill pipe to the production packer and set, the intent being to inject cement through it and the production packer to cover the perfs. For some reason, we could not establish injection at 5, 000 psi after the EZ-Drill was set. We pulled out of the hole with the DP, ran back in with a mill and milled up the EZ-DrilI. The well would then take injection at 2000 psi, 2 bpm. We came out of the hole with the mill and went back in with another EZ-DrilI. When we got it to bottom, we attempted to verify injectivity before setting it. The well would not take fluid at 3,000 psi (but this did give us a good casing test). We set the EZ-Drill just above the production packer and brought the pressure up to 5,000 psi, but the well wouldn't take fluid, I then called you with our request to set a minimum 100' cement plug in the 7" casing with the bottom being at the EZ-Drill setting depth of 9,679'. The AOGCC regs allow for such a 100' plug above the perforated interval, but this was not how we originally proposed to abandon the perfs and the the bottom of the cement plug is more than the requisite 50' above the perforations. For these two reasons, I called for approval of the new plan which you verbally issued last night. 1 of 2 11/12/01 1:27 PM Re: XTOE Well A23-01LW Decompletion The cement plug has been set and we are out of the hole and WOC. Later today we will RIH to ensure the TOC is no deeper than 9,579' and that the cement is competent with a 15, 000# weight test before proceeding to sidetrack the well. Thanks for your willingness to work with us on this. If you need additional information, please let me know. Bi// Tom Maunder <tom maunder~.admin.state.ak, us> Petroleum Engineer Alaska Oil and Gas Conservation Commission 2 of 2 11/12/01 1:27 PM RE: XTO A23~01RD and sidetrack Subject: RE: XTO A23-01RD and sidetrack Date: Wed, 25 Apr 2001 09:10:58 -0800 From: "Bill Penrose" <bill@fairweather.com> To: "Tom Maunder \(E-mail\)" <tom_maunder@admin.state.ak. us> Tom, Below each of your questions is my response: 1--Is the 7" string a long string or a liner?. Ail the measurements indicate a long string, but on the drawing included with with the 403 and 401, the comment liner is there. The 7" in the drawing is a long string. A: The 7" is a long string. The person who drew up the schematic used an inappropriate term (thought liner and casing are interchangeable terms). 2--It would be helpful to have drawings of the wellbore when the abandonment is accomplished and the ultimate sidetrack. A: The schematics for these wells are generated by the XTOC Production Engineer in OKC after the fact using daily drlg/workover reports. They use Visio which I'm unfamiliar with. I have several times considered obtaining a copy of Visio and training myself on it, but the anticipated results never seemed worth the time and effort. If these schematics are important to you then I can see if the OKC Engineer can gin these up based on proposals I give him. 3--For your decompletion procedure in the 403... 3a--What are the present BHP and SITP? A: BHP = 4779, SITP = 1200 psi 3b--Isn't it appropriate to kill the well before setting the BPV? A: Yes, I'll modify the program to have the well bullheaded with kill weight fluid before setting the BPV to ND/NU. 3c--^s I read it, if you load the tubing with mud you will be overbalanced the annulus. If you unsting, the tubing is going to want to U-tube and you will have to have to use the annular and choke to bring the fluid around. Please comment on this portion of the procedure. A: The only way to load the annulus with kill weight fluid is to unsting from the packer and circulate. We can't unsting from the packer without nippling up BOPs. The tubing has to be killed before setting the BPV for nippling down the tree and nippling up the stack. Therefore, the tubing will have to be full of kill weight fluid when it is unstung from the packer and the annular (or, as a backup, the pipe rams) and choke will be needed to circulate kill weight fluid into the annulus. 3d--I like the method you are using to abandon the existing intervals. Is it possible to perfom the abandonment first? You might be able to accomplish a cement kill pdor to ND/NU. This might take some wireline runs to assure the 1 of 3 5/3/01 10:04 AM RE: XTO A23-01RD and sidetrack tubing is clear and there may be other constraints that would prevent this, but it might be worth looking into. You could use some sort of a wiper plug dropped into the tubing. A: Yes, I thought about this, but I want to be able to unsting from the packer immediately after pumping cement in order to circulate out any excess. The only way to ensure the tubing doesn't end up plugged with cement is to overdisplace. However, the top perfs are close enough to the packer that the top of the cement plug needs to be very close to or right at the packer. 4-On the sidetrack in the 401 ... 4a--You make mention of the leak off at the window for your maximum surface pressure calculation, but you do not have a LOT or FIT planned once you are out of the window. Since you expect higher pressures in the upper part of the Hemlock, it is appropriate to include a LOT or FIT at the window. A: The LOTs we've been running on the wells to date give us confidence that we know the frac gradient quite well at Middle Ground Shoal. However, it's no problem running an FIT after milling out the window and I'll write one into the plan. 4b--You mention of the proximate wells. Is there any expectation of magnetic interfearance? It is appropriate to include some comment about your mitigation plans for any interfearance. A: Based on previous wells where the proximity was even closer, there was no magnetic interference using the same tools we're using now. We plan the well paths in these wells to remain outside the radius of possible magnetic interference from other wellbores. 4c--In your hazards note you specifically note that H2S is not a concern. Is that due to this being an injector? I thought that H2S was a risk drilling the Hemlock. Do other wells produce H2S? is it in lift gas? Do you have contingency equipment regardless of the risk from the specific well? A: The producers on Platform A have no H2S in their production stream. The only time H2S is seen is when an injection well is acidized and backflowed (the acid on the iron sulfite scale produces H2S). Nevertheless, we will, as always, maintain H2S scavenger among our on-site mud products and ensure the rig sensors are in working order. 4d--There is a 125' discrepancy between the KOP listed on the Baker Hughes sheet and the KOP entered on the 401. Which is correct? A: It appears you're referring to the KOP of 9675' on the BH! listing and the top of the 5" liner at 9500' on the 401. The discrepancey between these depths is the liner lap. The KOP will be as close to as possible to the packer at 9701' - estimated to be approximately 9675'. 4e--The letter notes the intended spud date is May 15, but on the 401 it is noted as June 10. I presume May 15 is correct 2 of 3 5/3/01 10:04 AM I-{I-: X I O AZ3-U1NU ancl stoetracK A: May 15 is correct. I don't know where that June 10 came from. 5--You have included the request for exception to the BOP ram requirements as has been granted previously. Looking at your stack diagram I note the blinds are on top. Neither RP 53 nor our regulation proscribe ram positions, but if you have blinds over pipe you cannot use your blinds for protection if you were to encounter a problem with your pipes. I'd like to discuss you philosophy regarding this. I don't know if one order is more correct than the other. A: Me and the guys on the rig have been round and round about this. The ram placements in the stack can be argued either way for drilling vs workover operations, assuming a kick on bottom or off bottom, or how the drilling supervisor intends to use them. It seems that there's a counter-argument for every point made, so I've just left it up to the guys. They think that it's better with the blinds on top of the VBRs. Hope this helps. Give a call or drop a note with any additional questions. Bill 3 of 3 5/3/01 10:04 AM WATER INJECTION REPORT PLATFORM A [ DISPOSAL WELL July-2001 A34-14 I A41A-I ILN A44.- 11 Al 1-13R2 Al 1-12 A23-01R A33-14 A44-02 DATE&NOTES: INJ INJ ANNU INJ INJ ANNU INS INJ ANNU INJ INJ ANNU ! INJ INJ ANNU INJ INJ ANNU INJ INJ NUINJ INJ. NU 01-Jul-2001 0 1600 1700 554 3600 £ 931 1500 9( 305 3600 20 1149 3600 450' 0 0 ( 585 3600 250 769 3600 13.~ 02-Jul-2001 0 50 100 550 3600 ( 1213 1600 5(309 3600 20 1112 3600 45( 0 0 ( 580 3600 751 3600 13.' 03-Jul~2001 0 250 220 551 3600 ( 468 1800 8( 321 3600 20 1096 3600 450: 0 0 ( 582 3600 25 738 3600 14( 04-Jul~2001 0 350 340 551 3600 ( 0 0 8( 322 3600 20 1083 3600 45( 0 0 ( 578 3600 25(~ 741 3600 14.' 05-Jul-2001 0 490 470 556 3600 ( 0 0 6{ 323 3600 20 1072 3600 47.~ 0 0 ( 573 3600 250 740 3600 15( 06-Jul-2001 0 500 470 561 3600 ( 667 1800 10( 311 3600 20 1045 3600 500 0 0 ( 573 3600 250 732 3600 15~ 07-Jul~2001 0 500 550 573 3600 ( 0 0 10f 314 3600 20 1036 3600 500! 0 0 ( 571 3600 30( 733 3600 17.' 08-Jul-2001 0 650 660 571 3600 ( 0 0 11( 312 3600 20 1022 3600 500 0 0 ( 569 3600 300 747 3600 18~ 09-Jul-2001 0 800 800 566 3600 ( 381 1650 11( 312 3600 20 1007 3600 50( 0 0 ( 569 3600 300 737 3600 18~ 10-Jul-2001 0 910 910 574 3600 f 0 0 11( 315 3600 20 1010 3600 525 0 0 ( 574 3600 300 756 3600 191 11-$ul-2001 0 1000 1020 571 3600 f 444 1700 11( 314 3600 20 1013 3600 525 0 0 { 594 3600 300 768 3600 19¢ 12-Jul-2001 0 1000 1100 572 3600 {~ 367 1600 Il01 331 3600 20 1047 3600 500 0 0 ( 640 3600 255 746 3600 18(~ 13-Jul-2001 0 1200 1200 563 36000 0 0 110~ 320 3600 20 1003 3600 500 0 0 { 603 3600 250 727 3600 18 14-Jul-2001 0 1250 1260 575 3600 01 0 0 11( 313 3600 20 1002 3600 500 0 0 { 603 3600 250 738 3600 184 15-Jul-2001 0 1300 1300 574 3600 O' 378 1850 110! 314 3600 20 997 3600 500 0 0 ( 607 3600 250 762 3600 18 16-Jul-2001 0 1350 1370 572 3600 0 405 1800 110 295 3600 20 978 3600 500 0 0 0 595 3600 300 777 3600 184 17-Jul-2001 0 1400 1400 573 3600 0 0 0 110 303 3600 20 971 3600 500 0 0 ~ 597 3600 300 781 3600 184 18-Jul-2001 0 1400 1400 578 3600 0 0 0 110 266 3600 20 971 3600 500 0 0 0 605 3600 300 779 3600 220 19-$ul-2001 0 1440 1440 582 3600 0 405 1600 110 244 3600 20 964 3600 500 0 0 0 610 3600 300 768 3600 218 20-Jul-2001 0 1460 1460 480 3600 0 375 1600 110 206 3600 20 793 3600 500 0 0 0 494 3600 300 625 3600 216 21-Jul-2001 0 1480 1480 633 3600 0 0 0 110 277 3600 20 872 3600 500 0 0 0 589 3600 275 780 3600 176 22-Jul-2001 0 1500 1500 634 3600 0 362 1500 110 292 3600 20 885 3600 500 0 0 0 567 3600 300 770 3600 208 23-Jul-2001 0 1520 1520 600 3600 0 0 0 110 285 3600 20 863 3600 500 0 0 0 555 3600 30(] 736 3600 225 24-$ul-2001 0 1540 1540 599 3600 0 0 0 110 286 3600 2(1 858 3600 500 0 0 0 557 3600 325 723 3600 230 25-Jul-2001 0 1560 1560 621 3600 0 407 1500 110 281 3600 20 866 3600 550 0 0 0 565 3600 35i~ 772 3600 239 26-Jul-2001 0 1570 1570 628 3600 0 0 0 120 278 3600 2(3 849 3600 575 0 0 0 556 3600 35{3 771 3600 246 27-Jul-2001 0 1590 1590 635 3600 0 405 1400 120 276 3600 2{3 849 3600 600 0 0 0 558 3600 35{3 775 3600 252 28-Jul-2001 0 1600 1600 627 3600 0 0 0 120 273 3600 2(3 843 3600 60~ 0 0 0 557 3600 35{3 773 3600 258 29-Jul-2001 0 1600 1600 626 3600 0 0 0 120 280 3600 2{3 838 3600 600 0 0 0 567 3600 35{3 764 3600 254 30-Jul-2001 0 1600 1600 623 3600 0 0 0 120 270 3600 2(3 835 3600 60~ 0 0 0 547 3600 35{3 762 3600 258 3 l-Jul-2001 0 1600 1600 631 3600 0 440 1500 120 262 3600 2(3840 3600 60{3 565 3600 35(3 778 3600 26~ TOTAL 0 18,104 7,648 9,110 29,769 0 17,885 23,319 MAXIMUM 1,600 !,700 3,600 0 1,850 120 3,600 20 3,600 600 0 0 3,600 350 3,600 260 AVERAGE 0 1,163 1,172 584 3,600 0 247 787 105 294 3,600 20 960 3,600 515 0 0 0 577 3,600 295 752 3,600 199 # DAYS l I 31 15 31 31 0 31 31 08/14/2001 A234}IR shut in as it is now being converted to a producer A34-14 shut in for upcomit WATER INJECTION REPORT PLATFORM A ' DISPOSAl. WELL May-2001 A34-14 A41A-! ll.N A44-11 A! I- 13R2 Al !-!2 A23-01R A33-14 A44-02 DATE&NOTES . INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNUl /NJ INJ 01-May-2001 975 3650 365( 564 3625 0 0 50 9C 362 3650 15 0 1775 900 0 1150 I i'50 652 3650 5 800 3650 02-May-2001 978 3650 365( 566 3650 0 0 50 8C 406 3650 10 0 1775 890 0 1150 1150 659 ' 3650 0 795 3650 03-May-2001 988 3650 365£ 579 3650 0 0 50 8C 421 3650 10 0 1800 900 0 1150 ! 150 666 3650 0 800 3650 04-May-2001 964 3650 365£ 565 3650 0 0 50 8¢ 405 3650 l0 0 1775 900 0 1150 1150 654 3650 0 784 3650 05-May-2001 970 3650 365( 538 3650 0 0 50 9C 395 3650 l0 0 1775 900 0 1150 1150 644 3650 0 819 3650 06-May-2001 954 3650 365( 551 3650 0 0 50 9C 382 3650 10 0 1775 900 0 1150 1150 633 3650 0 819 3650 07-May-2001 967 3650 365£ 550 3650 0 0 50 9C 363 3650 10 0 1775 900 0 ! 150 1150 641 3650 0 820 3650 08-May-2001 950 3650 365£ 475 3650 0 0 50 90 335 3650 10 0 1775 900 0 550 410 632 3650 0 786 3650 09-May-2001 947 3650 365( 480 3650 0 0 50 9C 333 3650 10 0 1775 900 0 300 140 ' " 634 3650 0 781 3650 10-May-2001 952 3650 365C 483 3650 (~ 0 50 90 357 3650 l0 0 1775 900 0 300 880 630 3650 2~ 823 3650 ! I-May-2001 953 3650 365C 476 36500 0 50 90 377 3650 10 0 1750 900 0 0 0 637 3650 20 824 3650 · 12-May-2001 952 3650 365( 535 3650 0 0 50 90 377 3650 l0 0 1750 900 0 0 0 629 3650 20 823 3650 13-May-2001 949 3650 365C 535 3650 0 0 50 90 374 3650 10 0 1750 900 0 0 0 628 3650 20 815 3650 14-May-2001 954 3650 365C 518 3650 (~ 0 50 90 376 3650 10 0 1750 900 0 0 0 624 3650 20 808 3650 15-May-2001 948 3650 365C 498 36500~ 0 50 90 364 3650 10 0 1750 900 0 0 0 613 3650 2( 806 3650 16-May-2001 954 3650 365C 503 3650 0 0 50 90 351 3650 10 0 1750 900 0 0 0 622 3650 20 811 3650 17-May-2001 956 3650 365(~ 526 3650 (~ 0 50 90 362 3650 15 0 1750 90C 0 0 0 625 3650 2( 809 3650 18-May-2001 948 3650 365(~ 508 3650I 0 50 90 369 3650 15 0 1750 900 0 0 0 618 3650 2( 806 3650 19-May-2001 435 3650 365¢ 236 3650 664 1700 190 168 3650 15 0 1750 900 0 0 0 279 3650 20 345 3650 20-May-2001 889 3600 355~ 525 3600 I~ 375 1600 140 248 3600 20 0 1750 90( 0 0 0 603 3600 10O 751 3600 21-May-2001 952 3650 365(~ 484 3650I 0 50 90 337 3650 15 0 1750 87.~ 0 0 0 647 365015 808 3650 22-May-2001 957 3650 365C 516 3650 0 50 90 362 3650 20 0 1750 900 0 0 0 ·659 3650 50 820 3650 23-May-2001 955 3650 365C 518 3650 0 0 50 90 372 3650 20 0 1750 900 0 0 0 663 3650 50 837 3650 24-May-2001 840 3650 365(~ 447 3650 (~ 449 1700 10~ 310 3650 12 0 1750 790 0 0 0 573 3650 10 688 3650 25-May-2001 1005 3650 365g 489 36500~ 0 50 90 319 3650 15 0 1750 880 0 0 0 738 3650 5 846 3650 26-May-2001 976 3650 365(~ 488 3650 i~ 460 1700 225 333 3650 15 0 1750 880 0 0 0 683 3650 10 824 3650 27-May-2001 958 3650 365(~ 476 3650 (~ 0 50 90 332 3650 15 0 1750 880 0 0 0 671 3650 I0 812 3650 28-May-2001 952 3650 365(~ 484 3650(~ 465 1700 20~ 337 3650 15 0 1750 875 0 0 0 647 3650 15 808 3650 29-May-2001 956 3650 365~ 481 3650 0 0 50 90 357 3650 15 0 1750 875 0 0 0 664 3650 15 793 3650 · . 30-May-2001 964 3650 365C 487 3650 0 390 1750 16C 352 3650 15 0 1750 875 0 0 0 666 3650 15 807 3650 31-Ma~-2001 950 3650 365(~ 493 3650 75] 0 50 90 340 3650 15 0 1750 900 0 0 0 667 3650 50 809 3650 TOTAL 29,048 15,574 2,803 10,876 0 0 19,601 24,477 MAXIMUM 3.650 3,650 3,650 75 1,750 225 3.650 20 1,800 900 1,150 1,150 3,650 100 3,650 AVERAGE 937 3,648 3,647 502 3,648 2 90 368 101 351 3,648 13 0 1,759 891 0 297 306 632 3.648 18 790 3,648 · · . # DAYS 31 31 6 31 0 0 31 31 06/13/2001 A23-01R shut in as it is now being convened to a producer WATER INJECTION REPORT PLATFORM A .... DISPOSAL WELL April-2001 A34-14 A41A-I ILN A44-. 11 Al 1-13R2 A11-12 A23-0 IR A33-14 A44-02 DATE & NOTES INJ INJ ANNU INJ INJ ANNU, INJ INJ ANNU RqJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INI ANNU 01-Apr-2001 937 3650 3650 759 3650 0 0 200 65 369 3650 10 0 1725 1000 0 1175 1175 633 3650 0 691 3650 02-Apr-2001 978 3650 3650 778 3650 0 0 200 65 382 3650 10 0 1725 1000 0 1175 1175 660 3650 0 720 3650 03-Apr-2001 980 3650 3650 796 3650 0 0 750 20 371 3650 10 0 1750 1000 0 1175 1175 661 3650 0 708 3650 04-Apr-2001 986 3650 3650 761 3650 0 0 200 60 372 3650 10 0 1775 975 0 1175 1175 655 3650 0 720 3650 05-Apr-2001 992 3650 3650 0 0 0 0 200 70 379 3650 15 0 1800 925 0 1200 1200 667 3650 0 785 3650 06-Apr-2001 969 3650 365C 382 3600 0 0 150 80 361 3650 15 0 1800 90G 0 1200 120~ 652 3650 0 714 3650 07-Apr-2001 981 3650 365¢ 413 3600 0 0 1000 4C 362 3650 15 0 1800 90~ 0 1200 120~ 661 3650 0 756 3650 0 08-Apr-2001 981 3650 365C 397 3600 0 0 200 6C 356 3650 1£ 0 1800 90~ 0 1200 120C 658 3650 0 760 3650 0 09-Apr-2001 979 3650 365£ 385 3600 ¢ 0 300 6( 368 3650 1£ 0 1800 90~ 0 1200 120( 658 3650 C 760 3650 0 10-Apr-2001 979 3650 365( 374 3625 ~ 0 150 6( 365 3650 1£ 0 1800 90( 0 1200 120( 660 3650 £ 758 3650 0 I l-Apr-2001 969 3650 365( 337 3625 £ 0 150 701 365 3650 I£ 0 1800 90( 0 1200 120( 651 3650 £ 762 3650 12-Apr-2001 982 3650 3650 300 3650 ( 0 150 70 366 3650 1( 0 1750 9£ 0 1200 117.~ 660 3650 £ 779 3650 13-Apr-2001 980 3650 3650 344 3650 0: 0 150 70 373 3650 10 0 1750 900 0 1200 1150 658 3650 ( 770 3650 14-Apr-2001 983 3650 3650 370 3650 0 0 150 70 375 3650 10 0 1750 900 0 1200 1150 663 3650 0 758 3650 15-Apr-2001 975 3650 3650 257 3650 0 0 75 70 379 3650 10 0 1750 900 0 1175 1175 648 3650 0 763 3650 16-Apr-2001 971 3650 3650 305 3650 0 0 75 70 368 3650 10 0 1750 900 0 1200 1150 646 3650 0 789 3650 '17-Apr-2001 968 3650 3650 308 3650 0 0 0 80 380 3650 10 0 1750 900 0 1200 1150 646 3650 36 810 3650 18-Apr-2001 983 3650 3650 311 3650 0 0 0 80 383 3650 l0 0 1750 900 0 1150 1150 659 3650 25 809 3650 19-Apr-2001 992 3650 365C 323 3650 0 0 0 80 397 3650 10 0 1750 900 0 1150 120~ 671 3650 0 786 3650 5 20-Apr-2001 966 3650 365(3 301 3650 0 0 0 9(3 391 3650 1(3 0 1750 90~ 0 1150 115(3 647 3650 ~3 769 3650 5 21-Apr-2001 979 3650 365C 312 3650 0 0 0 9C 392 3650 lC 0 1750 90( 0 1150 115C 658 3650 ~ 799 3650 5 22-Apr-2001 978 3650 365£ 324 3650 (3 0 0 9C 397 3650 lC 0 1750 90( 0 1150 I15C 659 3650 (3 811 3650 5 23-Apr-2001 972 3650 365( 296 3650 C 0 0 90 395 3650 lC 0 1750 90( 0 1150 115£ 649 3650 C 813 3650 5 24-Apr-2001 972 3650 3650! 294 3650 C 0 0 90 394 3650 lC 0 1750 900' 0 1150 115C 649 3650 ( 815 3650 5 25-Apr-2001 962 3650 3650 288 3650 0' 0 0 90 384 3650 10 0 1750 900 0 1150 1150 639 3650 ( 801 3650 5 26-Apr-2001 978 3650 3650 298 3650 0 0 0 85 394 3650 12 0 1775 880 0 1150 1150 655 3650 5; 798 3650 5 27-Apr-2001 977 3650 3650 208 3650 0 0 50 80 390 3650 100 1750 900 0 1150 1150 657 3650 5 813 3650 C 28-Apr-2001 967 3650 3650 0 3650 0 0 50 90 395 3650 10 0 1750 900 0 1150 1150 651 3650 10 815 3650 C 29-Apr-2001 981 3650 3650 630 3600 0 0 50 90 393 3650 I0 0 1775 900 0 1150 1150 655 3650 5 795 3650 30-Apr-2001 973 3650 3650 581 3625 0 0 50 90 371 3650 15 0 1775 900 0 1150 1150 652 3650 5 785 3650 ( TOTAL 29,270 11,432 0 11,367 0 0 19,638 23,212 MAXIMUM 3,650 3,650 3,650 0 1,000 90 3,650 15 1,800 1,000 1,200 1,20~ 3,650 36 3,650 5 AVERAGE 976 3,650 3,650 381 3,518 0 0 143 74 379 3,650 11 0 1,763 886 0 1,174 1,168 655 3,650 3 774 3,650 2 # DAYS 30 28 0 30 0 0 30 30 05/15/2001 a.23-01R and Al 1-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A DISPOSAL WELL March-2001 A34-14 A41A-I ILN A44-11 Al 1-13R2 Al 1-12 A23-0 IR A33-14 A44-02 iii iii~i~ ~.,~iii i iliii iili ii }il ili INJ [NJ ANNU INJ FNJ ANNU 1NJ INJ ANNU INJ [NJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ A 01-Mar-2001 10t5 3650 365( 800 3650 C 326 1600 4¢ 363 3650 0 0 1500 1150 0 1250 1250 02-Mar-2001 1009 3650 3650 794 3650 £ 435 1600 6C 370 3650 0 0 850 1150 0 1250 1200 722 3650 0 733 3650 03-Mar-2001 989 3650 3650 782 3650 ( 365 1600 25 386 3650 0 0 850 1150 0 1250 1250 702 3650 0 737 3650 04-Mar-2001 986 3650 3650 774 3650 ( 453 1800 25 390 3650 ¢ 0 1000 1150 0 1250 1250 693 3650 0 743 3650 05-Mar-2001 999 3650 3650 789 3650 ( 1170 650 25 395 3650 0 0 I000 1200 0 · 1250 1250 698 3650 0 765 3650 06-Mar-2001 984 3650 3650 771 3650 ( 618 1700 2( 391 3650 0 0 1100 1150 0 1250 1250 674 3650 0 710 3650 07-Mar-2001 997 3650 3650 781 3650 ( 490 1700 4( 321 3650 ( 0 1100 1150 0 1250 1250 671 3650 0 803 3650 08-Mar-2001 987 3650 3650 754 3650 0 0 700 50 340 3650 £ 0 900 1200 0 1250 1250 665 3650 0 763 3650 09-Mar-2001' 990 3650 3650 783 3650 0 370 1700 60 379 3650 ( 0 900 1200 0 1200 1200 673 3650 0 748 3650 10-Mar-2001 983 3650 3650 797 3650 0 0 700 50 387 3650 ( 0 900 120C 0 1200 1200 655 3650 0 728 3650 Il-Mar-2001 990 3650 3650 810 3650 0 340 1800 60 394 3650 '0 900 120( 0 1200 120( 662 3650 0 730 3650 12-Mar-2001 977 3650 365C 801 3650 0 0 700 60 377 3650 0 0 900 120( 0 1200 120( 663 3650 0 710 3650 13-Mar-2001 995 3650 365£ 813 3650 0 924 1800 60 386 3650 0 0 900 120( 0 1200 120( 674 3650 £ 731 3650 14-Mar-2001 973 3650 365£ 767 '3650 0 0 700 60 369 3650 0 0 900 120( 0 1200 1200 655 3650 £ 718 3650 15-Mar-2001 993 3650 365f 784 3650 0 750 1800 60 379 3650 0 0 1025 120( 0 1225 1225 675 3650 ( 760 3650 16-Mar-2001 976 3650 365( 771 3625 0 346 1800 40 376 3650 0 0 1225 1175 0 1225 1225 658 3650 ( 747 3650 17-Mar-2001 989 3650 365( 778 3650 0 423 1800 40 365 3650 0 0 1225 1150 0 1225 1225 668 3650 0 741 36* 18-Mar-2001 987 3650 3650 789 3650 0 0 925 20 375 3650 0 0 1225 1150 0 1225 1200 670 3650 0 758 36 19-Mar-2001 994 3650 3650 804 3650 ¢ 0 875 2( 390 3650 0 0 1225 1150 0 1225 1200 676 3650 0 738 3650 20-Mar-2001 974 3650 3650 769 3625 £ 0 875 6£ 368 3650 0 0 1000 1200 0 1225 1225 657 3650 0 725 3650 21-Mar-2001 992 3650 3650 791 3625 ( 0 650 6( 368 3650 0 0 1000 1250 0 1225 1200 672 3650 0 745 3650 22-Mar-2001 998 3650 3650 810 3625 ( 0 650 6( 406 3650 r 0 1000 1200 0 1200 1200 683 3650 0 757 3650 23-Mar-2001 996 3650 3650 811 3625 ( 424 1750 6( 407 3650 £ 0 1000 1200 0 1200 1200 685 3650 0 763 3650 24-Mar-2001 986 3650 3650 786 3625 0 457 1700 60 395 3650 ( 0 1000 1200 0 1200 120C 669 3650 0 726 3650 25-Mar-2001 979 3650 3650 778 3625 0 0 650 60 385 3650 ( 0 1000 1200 0 1200 120C 658 3650 0 728 3650 26-Mar-2001 977 3650 3650 818 3625 0 0 650 60 374 3650 ( 0 1000 120¢ 0 1200 120£ 656 3650 0 718 3650 27-Mar-2001 980 3650 3650 809 3625 0 0 650 60 385 3650 0 0 1000 120£ 0 1200 120( 660 3650 £ 718 3650 28-Mar-2001 974 3650 365C 821 3625 0 0 650 60 384 3650 0 0 1000 120( 0 1200 120( 656 3650 £ 717 3650 29-Mar-2001 989 3650 365£ 820 3650 0 254 1700 60 384 3650 0 0 850 1225 0 1200 120( 665 3650 ( 717 3650 30-Mar-2001 978 3650 365£ 769 3650 0 0 650 65 383 3650 0 0 850 125( 0 1200 120( 661 3650 ( 718 3650 31-Mar-2001 995 3650 365( 787 3650 0 0 400 40 387 3650 0 0 1650 1100 0 1200 1175 668 3650 ( 714 3650 TOTAL 30,631 24,511 8,145 11,759 0 0 20,885 22,851 MAXIMUM 3,650 3,650 3,650 0 1,800 65 3,650 0 1,650 1,250 1,250 1,250 3,650 0 3,650 AVERAGE 988 3,650 3,650 791 3,642 0 263 1,191 49 379 3,650 0 0 1,031 1,185 0 1,219 1,214 674 3,650 0 737 3,650 # DAYS 31 31 16 31 0 0 31 31 04/12/200 t A23-01R and A 11-12 shut in to lower me pressure while we ~e doing a side,rack on A 14-01 and A24-01. WATER INJECTION REPORT PLATFORM A DISPOSAL WELL .Februaw~2001 A34-14 A41A-I ILN A44-11 AII-13R2 AIl-12 A23-01R A12-12 A33-14 A44-02 }ii i ii~.' ~ ~ ~.'" i i }! i!iili iii iii!i ili [NJ INJ ANNU [NJ INJ ANNU INJ INJ ANNLI [NJ ][NJ ANNU INJ INJ ANNU INJ I]qJ ANNU INJ INJ ANNU l'NJ INJ ANNU INJ INJ A 01-Feb-2001 1030 3650 365£ 761 3650 £ 463 1900 60 463 3650 0 0 850 120( 0 1300 1300 0 0 0 747 3650 ( 716 3650 02-Feb-2001 1032 3650 365( 810 3650 f 1726 1850 20 470 3650 0 0 850 110( 0 1300 130C 0 0 O 750 3650 ( 726 3650 03-Feb-2001 1025 3650 365( 798 3650 ( 0 950 20 460 3650 0 0 850 115( 0 1300 130C 0 0 0 745 3650 ( 721 3650 04-Feb-2001 1031 3650 365( 799 3650 ( 490 1800 50 468 3650 0 0 1100 115( 0 1300 1275 0 0 0 754 3650 0 745 3650 05-Feb-2001 1036 3650 3650 803 3650 ff 0 750 3C 479 3650 0 0 1000 116( 0 1300 130( 0 0 0 754 3650 0 725 3650 06-Feb-2001 1022 3650 3650 789 3650 0 0 750 5£ 459 3650 0 0 925 1200 0 1300 130( 0 0 0742 3650 0 735 3650 07-Feb-2001 1033 3650 3650 800 3650 0 619 1800 6£ 469 3650 0 0 950 1200 0 1275 127~ 0 0 0 741 3650 0 726 3650 08-Feb-2001 1033 3650 3650 805 3650 0 577 1800 4( 470 3600 0 0 1000 1150 0 1300 1275 0 0 0 744 3650 0 733 3650 09-Feb-2001 1024 3650 3650 798 3650 0 453 1800 4( 463 3650 C 0 900 1200 0 1250 125ff 0 0 0732 3650 0 715 3650 10-Feb-2001 1020 3650 3650 795 3650 0 0 650 4( 449 3650 ~ 0 900 1200 0 1250 1250 0 0 ~ 736 3650 0 722 3650 Il-Feb-2001 1027 3650 3650 780 3650 0 433 1800 6( 451 3650 ~ 0 850 1200 0 1250 1250 0 0 C743 3650 0 744 3650 12-Feb-2001 1026 3650 3650 792, 3650 0 0 800 2( 456 3650 £ 0 1050 1150 0 1250 1250 0 0 £ 738 3650 C 727 3650 13-Feb-2001 1021 3650 365G 783 3650 C 320 1850 60 462 3650 ( 0 850 120~ 0 1250 1250 0 0 £ 733 3650 C 714 3650 14-Feb-200! 1017 3650 365~ 788 3650 ~ 0 i00 60 441 3650 £ 0 1850 1050 0 1250 1250 0 0 ( 727 3650 C 712 3650 15-Feb-2001 1034 3650 365~ 8i5 3650 ~ 625 1750 40 439 3650 ( 0 1650 120~ 0 1275 1275 0 0 ( 738 3650 C 712 3650 16-Feb-2001 996 3650 365£ 762 3650 C 398 1800 50 425 3650 ( 0 1650 120C 0 1275 1275 0 0 ( 705 3650 ( 716 3650 50 432 3650 0 0 875 120( 0 1275 1275 0 0 0 728 3650 ( 722 3~ 17-Feb-2001 1022 3650 365( 786 3650 £ 398 1800 18-Feb-2001 1004 3650 365( ' 780 3650 ( 375 1800 60 433 3650 0 0 875 120( 0 1275 1275 0 0 0 724 3650 ( 730 36:, 19-Feb-2001 1017 3650 365( 775 3650 ( 395 1800 5~ 436 3650 0 0 875 120( 0 1250 125¢ 0 0 0 719 3650 ff 736 3650 20-Feb-2001 1022 3650 3650 782 3650 ( 0 650 4C 443 3650 0 0 875 120( 0 1250 125( 0 0 0 721 3650 0 707 3650 21-Feb-2001 819 3650 3650 638 3650 339 1750 6C 355 3650 0 0 775 122~ 0 1275 1275 0 0 0 570 3650 0 588 3650 22-Feb-2001 1048 3650 3600 825 3650 0 389 1750 4£ 360 3650 0 0 800 1200 0 1250 125( 0 0 0 760 3650 0 753 3650 23-Feb-2001 1010 3650 3600 792 3650 0 0 600 ~ 339 3650 0 0 800 1200 0 1250 125( 0 0 ~ 728 3650 0 725 3650 24-Feb-2001 999 3650 3600 793 3650 0 0 600 4( 347 3650 ~ 0 800 1200 0 1250 125ff 0 0 ~ 713 3650 0 723 3650 25-Feb-2001 1013 3650 3600 808 3650 0 394 1750 4( 361 3650 0 0 1200 1200 0 1250 1250 0 0 C 726 3650 0 738 3650 26-Feb-2001 994 3650 3650 814 3650 0 446 1700 4( 360 3650 C 0 1200 1200 0 1250 1250 0 0 ~ 704 3650 0 702 3650 27-Feb-2001 774 3650 3650 611 3650 0 339 1750 4( 282 3650 £ 0 1200 1200 0 1250 1250 0 0 £ 546 3650 0 559 3650 28-Feb-2001 1088 3650 3650 839 3650 0 0 600 40 369 3650 ( 0 1200 1200 0 1250 1250 0 0 ( 797 3650 ~ 794 3650 .. TOTAL 28,217 21,921 9,179 11,841 0 0 0 20,265 20,066 MAXIMUM 3,650 3,650 3,650 0 1,900 60 3,650 0 1,850 1,225 !,300 1,300 0 0 3,650 01 3,650 AVERAGE 1,008 3,650 3,643 783 3,650 0 328 1,382 44 423 3,648 0 0 1,025 1,183 0 1,268 1,266 0 0 0 724 3,650 0 717 3,650 # DAYS 28 28 18 28 0 0 0 28 28 03/12~001 A23-01R and A11-12 shut in to lower the p~ssu~ while we ~e doing a sidetrack on Al4-01 and A24-01. RECEIVED MAR 1 ZOO1 Alaska Oil & Gas Cons. Commission Anchorage WATER INJECTION REPORT PLATFORM A January-2001 01-Jan-2001 02-Jan-2001 03-Jan-2001 04-Jan-2001 05-Jan-2001 06-Jan-2001 07-Jan-200 1 08-Jan-2001 09-Jan-200 1 10-Jan-2001 1 l-Jan-2001 12-Jan-2001 13-Jan-2001 14-Jan-2001 15-Jan-2001 16-Jan-2001 17-Jan-2001 18-Jan-2001 19-Jan-2001 20-Jan-200 t 2 l-Jan-2001 22-Jan-2001 23-Jan-200 ! 24-Jan-2001 25-Jan-2001 26-Jan22001 27-Jan-2001 28-Jan-2001 29-Jan-2001 30~Jan-2001 31 -Jan-2001 TOTAL MAXIMUM AVERAGE #DAYS A34-14 INJ INJ ANNU 1027 3675 3625 1047 3675 3625 1033 3675 3625 1037 3675 3625 1043 3650 365C 1035 3650 365C 1033 3650 365C 970 3600 360( 1031 3650 365£ t054 3650 365C 1050 3675 3675 1040 3675 3675 1034 3650 365( 1029 3675 36751 1~4 3650 3650: 1039 3650 3650 1036 3650 3650 1038 3675 3675 1028 3675 3675 A41A-IILN DISPOSAL WELL A44-11 INJ INJ ANNU INJ INJ ANNU 778 3625 0 1000 2C 795 3625 0 1000 2£ 787 3625 0 1000 2¢ 778 3625 379 1150 2C 795 3650 0 850 4£ 778 3650 362 1200 5¢ 786 3650 0 830 3£ 800 3600 1907 1150 4C 787 3650 220 1100 2£ 794 3650 345 1100 4£ 798 3625 0 650 45 785 3650 310 1100 787 3650 0 650 45 789 3650 0 600 805 3650 0 600 6ff 809 3650 0 600 70 778 3650 0 350 1200 65 804 3650 0 0 675 60 792 3650 0 786 1000 70 AII-13R2 INJ INJ ANNU 449 3600 0 438 3600 0 437 3600 0 435 3600 0 447 3650 0 436 3650 0 411 3650 0 370 3600 0 407 3650 426 3650 433 3700 435 3600 427 3600 426 3600 423 3600 425 3600 427 3600 415 3600 422 3600 Al 1-12 A23-01R I A12-12 I A33-14 IANC~j { INJ [ANNuI IANC~, [ INJ {AN~UI IANC~j [ INJ [ANNUI IANZT { INJ IANNU 0 1300 1100 0 1300 1100 0 1300 !100 0 1300 1100 0 1100 1130 0 1050 1130 0 1050 1120 0 1100 1100 0 1300 1000 0 1300 1150 0 900 1150 0 900 1175 0 900 1175 0 875 1175 0 850 1175 0 850 1175 0 850 120(] 0 900 1175 0 875 120(3 0 1325 1325 0 1325 1325 0 1325 1325 0 1325 1325 0 1350 1350 0 1350 1350 0 1350 1350 0 1350 1350 0 1325 1325 0 1325 1325 0 1350 1350 0 1325 1325 0 1350 1350 0 1325 1325 0 1325 1325 0 1325 1325 0 1325 1325 0 1300 1325 0 1325 1325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 780 3650 795 3650 778 3650 787 3650 788 3650 788 3650 768 3650 682 3600 768 3650 807 3650 794 3650 780 3650 768 3650 764 3650 0] 765 3650 0 772 3650 0' 770 3650 0 766 3650 0 759 3650 1026 3650 3675 1039 3650 3675 1033 3650 3675 1039 3650 3675 1031 3650 3675 1026 3650 3650 1027 3650 3650 1025 3650 3650 1035 3650 3650 1032 3650 3650 1028 3650 3650 1025 3650 3650 32.004 3.675 3.675 1.032 3.656 3,653 778 3650 790 3650 777 3650 800 3650 787 3650 800 3650 799 3650 795 3650 776 3650 776 3650 776 3650 774 3650 24,453 3.650 789 3.644 0 0 700 40 0 384 1100 60 290 650 40 0 650 50 402 1150 60 0 600 60 0 600 60 0 600 60 0 600 6(3 790 1200 6(3 0 600 60 0 600 6~ 6,525 0 1.20070 0 210 855 49 12 420 3600 409 3600 415 3600 423 3600 425 3600 439 3600 445 3600 447 3600 455 3600 460 3600 458 3600 461 3600 13.346 3,700 431 3,611 0 950 1175 0 925 120( 0 925 1175 0 875 200( 0 850 200( 0 850 120( 0 850 120( 0 850 120( 0 850 120( 0 850 120( 0 850 120( 0 850 120( 0 1,300 2,00( 0 983 1,212 0 1300 130( 0 1325 1325 0 1325 1325 0 1300 1300I 0 1300 13001 0 1300 13001 0 1300 1300 0 1300 1300 0 1300 1275 0 1300 1275 0 1300 1275 0 1300 1300 0 1,350 1.350 0 1.321 1,319 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 759 3650 769 3650 765 3650 765 3650 764 3650 750 3650 752 3650 750 3650 764 3650 761 3650 755 3650 748 3650 23.781 3,650 767 3,648 A44-02 ' I '742 ' 3650 '"0~ 1000 3650 0~ ;9355 336655~~ 740 3650 753 3650 741 3650 697 3600 744 3650 0 766 3650 0: 764 3650 O! 753 3650 0 742 3650 0 739 3650 0 737 3650 0 737 3650 0 735 3650 728 3650 729 3650 738 3650 711 3650 714 3650 734 3650 722 3650 711 3650 721 3650 708 3650 716 3650 734 3650 725 3650 733 3650 22.744 3,650 734 3,648 31 02/12/2001 A23-01R and Al 1-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A 1066 3650 3650 833 3625 1009 3650 3625 890 3625 01-Dec-2000 02-Dec-2000 03-Dec-2000 04-Dec-2000 05-Dec-2000 06-Dec-2000 07-Dec-2000 08-Dec-2000 09-Dec-2000 10-Dec-2000 1 l-Dec-2000 12- Dec-2000 13-Dec-2000 14-Dec-2000 15-Dec-2000 16-Dec-2000 17-Dec-2000 18-Dec-2000 19- Dec-2000 20-Dec-2000 21 -Dec-2000 22-D¢c-2000 23-Dec-2000 24-Dec-2000 25-Dec-2000 26-Dec-2000 27-Dec-2000 28-Dec-2000 29-Dec-2000 30-Dec-2000 3 I- Dec-2000 TOTAL MAXIMUM AVERAGE # DAYS 01/12/2001 1055 3650 3650 1073 3650 3650 1062 3650 3650 1059 3650 3650 1059 3650 3650 1041 3625 3625 1047 3650 365( 1047 3600 3600' 1046 3650 3650 1024 3650 3650 1052 3650 3650 1045 3650 3650 1028 3650 3650 1041 3650 3650 1042 3650 3650 1026 3650 3650 995 3650 3650 1042 3675 3675 1079 3675 3675 1051 3675 3675 1049 3650 365( 1051 3650 365( 1043 3650 3650 105t 3650 3650 1042 3675 3675 1051 3675 3675 1033 3675 3625 1031 3675 3625 1052 3675 3625 32,392 3,675 3,675 1,045 3,654 3,648 841 3625 816 3625 863 3625 835 3625 889 3625 838 3625 857 3600 854 3600 DISPOSAL WELL A44-11 INJ INJ ANNU 528 1800 0 650 2C 0 500 5C 0 350 6( 0 350 714 1650 0 700 0 0 300 0 0 200 60 01 0 150 65 878 3600 0 ~8 1800 65 852 3625 886 3625 769 3625 797 3600 785 3625 768 3600 781 3625 763 3625 820 3625 840 3625 810 3625 794 3625 813 3625 811 3625 815 3625 820 3625 788 3625 790 3625 815 3625 801 3625 25,512 3,625 823 3,621 0 820 1650 0 0 300 40 0 200 50 0 100 65 0 100 70 848 1600 80 0 250 4C 402 1500 6C 402 1600 2( 0 40O 3( 0 100 6( 379 1600 60 0 345 1800 70 0 0 800 20 379 1800 20 0 1000 20 392 1800 20 384 1800 20 371 1850 2C 0 1000 2C 6,412 1.850 80 207 958 41 ' 13 All-13R2 All~12 414 3600 0 2450 75G 415 3600 0 2450 750 430 3600 0 2400 75C 432 3600 0 2400 75C 435 3600 0 2400 75( 433 3600 0 2400 75( 440 3600 0 2400 73( 454 3625 0! 0 2375 75( 458 3650 0 0 2375 750 451 3600 0 0 2350 750 444 3600 0 2350 750 423 3650 0 2350 750 430 3650 0 2350 750 432 3650 0 2300 750 420 3625 0 2300 775 426 3600 0 2350 760 434 3600 0 2350 775 425 3600 0 2350 775 396 3600 0 2325 775 427 3600 0 1275 ' 1025 366 '3600 0 2325 80( 368 3600 0: 0 2325 775 381 3600 0 0 2300 800 387 3600 0 2300 800 393 3600 0 900 900 413 3600 0 2050 1025 427 3600 0 1275 1025 443 3600 0 1275 1025 446 3600 0 1275 1025 459 3600 0 1300 110~ 468 3600 0 1300 110~ 13,170 3,650 425 3,608 0 2,450 1,10~ 0 2,094 830 A23-01R A12-12 INJ INJ NNU INJ INJ ANNU 0 1400 145G 0 0 0 2400 140(3 0 0 0 1400 14012 0 0 0 1400 14012 0 0 0 1400 140£ 0 0 0 1400 140( 0 0 0 1400 1400 0 0 0 1400 1400 0 0 0 1400 1400 0 0 0 1400 1400 0 0 0 1400 1400 0 0 0 1400 1400 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1400 14012 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1350 135( 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1375 1375 0 0 0 1350 135G 0 0 0 1350 135C 0 0 0 1350 135C 0 0 0 1350 135C 0 0 0 1325 1325 0 0 0 2,400 1,450 0 1,412 1,381 0 0 0 0 A33-14 A44-02 845 3650 835 3600 840 3650 817 3650 845 3650 848 3650 823 3650 812 3650 820 3650 778 3650 819 3650 799 3625 738 3650 0! 723 3625 797 3650 0 729 3600 796 3650 0 745 3625 0: 800 3600 745 3600 0 788 3600 747 3600 0 775 3650 731 3650 0 791 3650 756 3650 788 3650 742 3650 775 3650 752 3625 787 3650 742 3625 789 3625 756 3650 760 3625 737 3650 738 3625 707 3650 802 3650 0 750 3650 859 3650 0 791 3650 826 3650 788 3650 0! 826 3650 789 3650 0 821 3650 768 3650 810 3650 780 3650 812 3650 747 3650 802 3650 750 3650 816 3650 772 3650 782 3650 737 3650 781 3650 756 3650 800 3650 765 3650 24,851 3,650 802 3,644 23,694 3,650 0 764 3,640 A23-01R and A 11-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A Nc,,vembcr C()({) A34-14 iiiiiiii~.~i~::~::ii{::iiiii::ii!::i::iii::i::i n~, ~ A~U 0 ! · Nov. 2000 02-Nov-£O00 03..Nov,-2000 (~.l- Nov-2~ 05. N o',;- Z'000 0o-Nov-2900 07 .N ov--20C~,) 09. No',;. 2000 I 0-Nov-2000 1 t .-Nov..20,?g?, 12- No~,'-20(:~) 13.. No',;. ! 4-Nov-2000 1.5-.Nov..20(~) 16-Nov~20¢)() IT.Nov. I S-Nov-2000 t 9..Nov.-20,'.~) 20-Nov-20C4) 2 l.Nov- 2000 22*Nov-2000 23..Nov.-200(~ 24-Nov-2000 25 .Nc,',;- .'!000 26-Nm,-2000 2 ?-Nov-2000 28-Nov-2001') 29-Nox;. 2(tl0 30-Nov-2000 TOTAL MAXIMUM AVERAGE # DAYS 12/11/2000 I DISPOSAL WELL A41A- 1 I LN A44-1 I ACT ACT INJ INJ ANNU INJ [NJ ANNU 1107 3650 3650 1091 3650 3650 1087 3650 3650 1091 3650 3650 1079 3650 3650 793 3650 3650 358 2350 2350 1211 3650 3650 1143 3625 3625 1083 3650 3625 1084 3625 3625 1066 3650 365~ 1076 3625 3625 1037 3625 3625 1055 3625 3625 1039 3625 365¢ 1036 3625 3625 1035 3625 3625 1036 3625 3625 1039 3625 3625 1023 3625 362~ 1024 3625 3625 1087 3650 36251 1078 3650 3650 1069 3650 3650 1076 3650 3650 1079 3650 3650 1073 3650 3650 1078 3650 3637.5 1110 3650 3650 31,243 3,650 3,650 1,041 3,597 3,595 929 3625 904 3625 902 3625 835 3625 878 3625 662 3625 237 1400 931 3600 956 3600 897 3625 964 3600 954 3600 953 3600 935 3625 966 3600 929 3600 944 3600 947 3600 941 3600 893 3600 924 3600 920 3600 904 3600 873 3625 909 3625 930 3625 901 3625 854 3625 867 3612.5 881 3625 26,520 3,625 884 3,539 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 0 50 5~ 0 50 5~ 0 50 5~ 381 1600 5C 0 50 45 850 1700 lC 0 125 lC 0 50 6C 507 1500 7C 0 180 6C 500 1750 6C 402 1500 6~ 0 100 6( 501 1500 60 0 I00 40 426 1500 60 1820 1500 20 1200 1700 20 0 130 20 0 125 50 477 1500 50 607 1700 5~ 0 100 2~ 500 1600 45 924 1600 90 9,095 0 1,750 90 0 303 734 47 13 A11-13R2 ACT [NJ [NJ ANNU 541 3600 568 3600 557 3600 549 3600 530 3600 387 3600 108 1100 420 3625 453 3600 315 3600 344 3650 340 3650 355 3625 349 3625 338 3600 336 3600 355 3600 360 3600 374 3600 362 3600 362 3600 367 3600 401 3650 413 3650 391 3650 409 3650 379 3650 384 3650 397 3600 544 3600 11,988 3,650 400 3,533 Ali-12 ACT 594 3675 150 591 3675 150 587 3675 150 592 3675 150 585 3675 150 428 3675 150 0 2800 150 0 2800 150 0 2700 55g 0 2675 575 0 2650 60~ 0' 2650 625 0 2600 63C 0 2600 65C 0 2600 65C 0 2600 65C 0 2600 675 0 2550 70( 0 2550 70( 0 2550 700 0 2525 700 0 2525 700 0 2500 725 0 2475 725 0 2475 725 0 2475 725 0 2500 725 0 2500 725 0 2475 737.5 599 3675 150 A23-01R ACT INJ [NJ ANNU 0 1500 150( 0 1500 150( 0 1500 150( 0 1500 150( 0 1500 1475 0 1475 14751 0 1475 1475: 0 1475 14'75 A12-12 ACT I INJ [ [NJ ANNU I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 ACT . [NJ I'NJ ANNUal 913 3650 0 903 3650 0 891 3650 0 901 3650 0 881 3650 0 644 3650 0 281 3000 0 1044 3650 0 3,976 0 3,675 738 0 133 2,837 518 6 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 145~ 0 1450 145~ 0 1450 145~ 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1412.5 1412.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1500 1500 0 1,5~ 1,5~ 0 1,452 1,451 0 0 0 0 0 0 947 3600 0 897 3650 0 884 3650 0 861 3650 0 865 365o 0 819 3650 0 835 3650 0 822 3600 ) 811 3600 806 3600 0 804 3600 0 810 3600 0 792 3600 0 787 3600 0 888 3650 0 878 3650 0 857 3650 0 863 3650 0 866 3650 0 855 3650 0 869 3650 0 0 926 3650 0 25,200 0 3,6500 0 840 3,615 0 30 A23-01R and Al 1-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. t't't WATER INJECTION REPORT PLATFORM A 2000 A34-14 -Oct. 2000 OB. 0B~..2000 05..Qc~.2000 omF-Oct..2000 09..0c~. 2000 2-0cI..2000 3..0c[. 2000 5-Ocb.2000 ¢.:0ct-2000 9- 20-0c1.-2000 1 ..Oct. 2000 3- 25-.0ct. 2000 26-0c~-2000 27.0c~..2000 29-.0ct. 30-0ct-2~00 l.-Oct-.2000 TOTAL MAXIMUM AVERAGE # DAYS 11 ! 14/2000 1103 3600 3600 1107 3600 3600 1097 3600 3600 1155 3600 3600 1129 3600 3625 1109 3600 3625 1141 3600 3625 1148 3600 3625 1149 3600 3625 1147 3600 3625 1133 3600 3626 1140 3600 360C 1127 3600 360C 1133 3650 365C 1119 3650 365¢ 1129 3650 3650 1122 3650 3650 1132 3650 3650 1109 3650 3625 1120 3650 3625 1112 3650 3625 1116 3650 3625 1105 3650 3625 1096 3650 3650 1103 3650 3650 1097 3650 3650 1104 3650 3650 1106 3650 3650 1142 3650 3650 1110 3650 3650 1080 3650 3650 A41A-IILN ACT INJ [NJ ANNU 34,720 3,650 3,650 1,120 3,629 3,631 1002 3575 1001 3575 996 3575 1015 3600 975 3600 985 3600 1013 3600 982 3600 951 3600 946 3600 928 3600 922 3600 931 3625 DISPOSAL WELL A44-11 ACT INJ 1NJ ANNU 0 50 10C 0 50 10C o sd lOC 0 50 10C 0 50 10C o 50 lOO 0 50 100' 0 50 100 0 50 100 0 50 100 0 50 100 0 50 100 0 80 100 Al I-13R2 ACT INJ [NJ I ANNU I 426 3600 434 3600 436 36OO 463 35OO 457 3500 472 35O0 522 3500 515 3500 520 3500 526 35OO 519 3500 521 3600 515 3600 981 3625 971 3625 984 3625 981 3625 980 3625 961 3650 947 3625 913 3625 885 3625 945 3625 950 3600 936 3625 959 3625 925 3625 940 3650 965 3650 881 3625 918 3625 29,669 3,650 957 3,615 o: 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 0 0 50 100 o 50 100 0 50 100 0 50 10C 0 50 10C 223 1475 10C 0 50 7( 0 50 80' 0 50 90 0 50 90 517 3625 491 3625 502 3625 499 3625 494 3625 508 3625 503 3625 512 3625 523 3625 519 3600 514 3600 500 3600 497 3600 519 3600 520 3600 530 3600 544 3600 532 3600 223 1,475 100 7 97 98 15,550 3,625 502 3,581 AIl-12 528 3600 250 533 3625 25O 53O 3625 250 572 365O 245 563 365O 24O 555 3650 250 594 365O 250 600 3650 250 603 3650 25C 6O3 365O 25C 597 3650 200 601 3600 176 593 3650 19C 597 3650 18£ 589 3650 200! 596 3650 200 594 3650 190 595 3650 190 591 3650 200 595 3650 200 591 3650 200 597 3650 175 588 3650 175 583 3650 175 590 3650 150 585 3650 175 591 3675 150 593 3675 15C 615 3675 150 599 3675 588 3675 15C 18,149 3,675 250 585 3,649 2013 31 A23-01R [ A12-12 { A33-14 0 1550 1550 0 0 0 1550 1550 0 1550 1550 0 1550 1550 0 1550 1550 0 1550 1525 0 1550 1500 0 1550 1500 0 1550 1500 0 1550 1500 0 1550 1500 0 1500 1500 o o o o o o 0 o o o o o o o 0 0 o 0 0 0 0 0 I 924 36OO 16 930 3600 16 915 36OO 17 1001 3600 17 971 36OO 17 948 3600 0 1019 36OO 0 1019 3600 0 1015 36OO 0 1006 3600 0 992 36O0 0 99O 36OO 0 0 1500 1500 0 1500 1500 0 1500 150C 0 1500 150C 0 1500 150C 0 1500 150£ 0 1500 150£ 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 0 1500 1500 o 1,55o 1,55o o 1,518 1,5o9 o 0 0 o o o o 0 0 0 0 o 0 0 0 0 o 0 o o o 0 o o 0 o 0 0 o o 0 0 0 o 0 o o o o o o o 0 971 3650 0 0 976 3625 0 0 957 3625 0 o 967 3650 ~ 0 958 3650 955 3650 0 948 3650 0 950 3650 0 939 3650 0 949 3650 0 927 3650 0 916 3650 0 922 3650 0 914 3650 0 921 3650 0 919 3700 0 951 3650 0 0 926 3650 0 0 897 3650 0 29,593 0 3,700 17 0 955 3,631 3 31 A23-01R shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A DISPOSAL WELL Aug !.~,~..~00o A34-14 A4 ] A-I l LN A44-11 Al 1-13R2 0 i -.Au,o,-200Ci 1128 3400 3400 1035 3650 02. Aug..2000 l 157 3450 3450 1037 3650 (~3.-.~\ u~-200~3 1146 3450 34501 1045 3600 0 75 I16[ 555 3650 AIl-12 [ A23-01R ] A12-12 510 3650 500] 0 1700 I TOOI 0 0 55~ 33~55~ ~'S~] ~ '177~ 1177~[ ~ ~ 94-Aug-200(~ 05 · Aug..2000 06..A ug. 2000 07-Aug-2000 O8-Aug..2000 09..Aug- 2000 10. Aug--2000 11 .-Aug-2000 [ 2-Aug-2000 t 3..Aug.-2000 i 4..A ug- '2000 1S-Aug-2000 16-Aug-2000 ! 7.-Aug.2000 18-.Aug..2000 t 9-Aug-2000 20-Aug-2000 2 ! ..Aug..2000 22.-Aug- 2000 23-Aug--2000 2-";-A ug-200O 25..Aug-2000 26. Aug.-2000 27.-Aug-200{3 2.S'-Aug-200(~ 29-.Aug.-2000 30.-A ug. 2000 3 I-Au¥-200O TOTAL MAXIMUM AVERAGE #DAYS 1176 3475 34751 1205 3500 35ooi 1197 3500 350( 1165 3500 350( 1172 3500 3500 1183 3500 3525 1254 3575 3550 '1312 3600 3600 1286 3625 3600 1291 3650 3650 1273 3650 3650 661 3650 3650 1242 3450 3450 2169 3450 3495 667 3475 3500 1362 3450 3490 · !362 3450 3500 .1343 3450 3500 1331 3450 3500 1356 3450 3500 1433 3600 3575 1496 3650 3600 1474 3650 3600 1459 3650 3600 1452 3650 3600 1413 3650 3600 1429 3650 3600 1404 3625 3700 39,998 3,650 3,700 1,290 3,541 3,542 1061 3625 1035 3600 1044 3625 1035 3600 1041 3625 I047 3600 1040 3600 1053 3600 1030 3600 1037 3600 1043 36OO 591 3600 865 3600 1045 3450 1013 3450 1004 3450 1006 3450 1003 3450 0 75 115 0 75 115 0 75 115 0 75 117 0 75 119 0 75 119 816 1750 119 0 75 120 0 75 120 0 75 120 0 75 120 0 75 120 0 75 120 0 50 119 0 50 120 0 50 120 0 50 120 0 50 120 571 3650 559 3650 564 3650 558 3650 562 3550 566 3550 564 3550 571 3550 558 3550 562 3550 570 3550 278 355O 357 3550 443 3400 447 3400 458 3400 457 3400 458 3400 518 3650 450 506 3650 450 509 3650 425 502 3650 425 5O6 365O 45O 508 3650 425 508 365O 40O 515 3650 400 502 3650 400 507 3650 400 510 3650 400 152 365O 40~ 322 3650 500 412 3510 400 407 3525 40fl 409 3510 44fl 413 3515 425 416 3510 415 0 1750 1700 0 1700 1700 0 1700 1700 0 1750 1700 0 1700 1700 0 1700 1700 0 1700 1700 0 1700 1700 0 1700 170~ 0 1700 170C 0 1700 170~ 0 1700 170C 0 1650 165C 0 1680 165C 0 1650 165£ 0 1650 165r 0 1650 165£ 0 1650 165£ 991 3450 1018 3450 1047 3550 1087 36O0 1166 3600 993 3600 1077 3600 1135 3600 983 3600 1052 3600 31,659 3,650 1,021 3,570 0 50 119 0 50 120 0 50 120 0 50 118 01 0 50 118 OI 0 50 118 o: o 50 116 0 0 50 116 0 0 50 115 0 0 50 115 816 0 1,750 120 0 26 117 118 1 458 3400 0 468 3400 537 3500 601 3550 608 3550 606 3550 605 3550 584 355O 588 3550 587 370O 16,412 3,700 529 3,542 416 3510 44C 0 427 3505 45C 505 3600 40¢ 572 3650 35C 578 3650 375 574 3650 35( 575 3650 35¢ 562 3650 35¢ 568 3650 35( 560 3650 390 14,989 ' 0 3,650 500 0 484 3,617 413 31 0 1650 16501 0 1650 1650 0 ~650 1650 0 1600 1600 0 1600 1600 0 1600 1600 0 1600 1600 0 1600 1600 0 1600 1600 0 1700 1650 0 1,750 1,725 0 1,671 1,665 0 0 0 0 o o 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 A33-14 . ['i~ 1115 3100 0I 1152 3175 1197 3250 1181 3275 1137 3300 1160 3325 1256 3350 1328 3400 1348 3450 1324 3450 0 1429 3475 01 0 1488 3525 0! 0 735 3525 1159 35O0 1316 3500 0 1085 3500 1078 3450 1129 3450 1165 3450 1129 3500 1136 3500 1320 3600 1406 3600 1366 3600 1329 3600 1297 3600 1256 3600 1248 3600 1215 3600 37,738 0 3,600 0 0 1,2.17 3,4380 I 31 09/18/2000 A23-01R shut in to lower-the pressure while we arc doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A .. DISPOSAL WELL .hdy-2,300 A34-14 A41A-I 1LN A44-11 Al 1-13R2 Al 1-12 A23-01R A12-12 A33-14 :::::::::::::::::::::::::::::::::::::::::: 0t .Jul.'~000 0 940 1000 976 3600 (3 0 75 102 484 3600 C 207 3650 800 0 1900 1900 0 0 0 0 0 -02-.J ul-2000 0 940 975 988 3600 (3 0 75 103 470 3600 ff 441 3650 850 0 1900 1900 0 0 0 0 0 C 03-J~11-2000 0 940 975 974 3600 12 0 75 103 481 3600 0 445 3650 85(3 0 1900 1900 0 0 0 0 0 C 04-Jul-2000 0 940 975 996 3600 C 0 75 103 497 3600 0 455 3650 8513 0 1900 1900 0 0 0 0 0 -OS-.Jul..2000 0 920 975 960 3600 12 0 75 104 491 3600 0 441 3650 85(3 0 1900 1900 0 0 0 0 0 :)6..Jul.2000 0 930 975 988 3600 C 0 75 104 510 3600 0 454 3650 875 0 1875 1875 0 0 0 0 0 0 O?-Jul-2000 0 920 950 983 3600 12 0 75 125 506 3600 0 454 3650 875 0 1875 1875 0 0 0 0 0 0 08-.hd-200O 0 920 950 976 3600 C 0 75 125 501 3600 0 448 3650 875 0 1875 1875 0 0 0 0 0 0 09,.Jul.2000 0 950 920 982 3625 12 0 75 125 501 3600 0 450 3650 875 0 1850 1850 0 0 0 0 0 0 ~ O-.J ul-.2009 0 950 920 977 3600 ¢ 0 75 135 495 3600 0 448 3650 875 0 1850 185(3 0 0 0 0 0 0 } I-.hal-2000 0 950 920 978 3625 C 0 75 135 480 3600 0 445 3650 9012 0 1850 18513 0 0 0 0 0 0 12-Jul-2000 0 910 950 986 3600 C 0 75 109 478 3600 0 451 3650 90C 0 1825 1825 0 0 0 0 0 0 13-.Jul--2000 0 910 950 976 3600 C 0 75 109 478 3600 0 451 3650 90C 0 1825 180C 0 0 0 0 0 0 i ,1..Jul-2000 0 910 950 979 3600 Oi 0 75 109 475 3600 0 456 3650 90( 0 1825 1775 0 0 0 0 0 0 i5-Jul-2000 0 910 950 975 3600 0 0 75 109 477 3600 0 454 3650 900 0 1825 175C 0 0 0 0 0 ~6-.ut-2 )00 0 910 950 978 3600 0 0 75 10~ 492 3600 0 456 3650 950 0 1825 175(: 0 0 (3 0 0 17-Jut.2000 0 900 9513 918 3600 0 0 75 10~ 415 3600 0 388 3650 950 0 1800 180~ 0 0 13 0 0 0 i 8-d ul.-2000 0 900 95(3 826 3600 0 0 75 10~ 348 3600 0 355 3650 950 0 1800 180£ 0 0 C 0 0 13 19-.h-q-2000 34 1950 200C 909 3650 0 0 75 II 400 3600 0 415 3675 825 0 1800 1800 0 0 C 0 0 13 · . 20-Jul-200(~ 244 1950 200(3 1087 3650 0 0 75 11 491 3600 0 531 3675 825 0 1800 1800 0 0 12 0 0 21 ..Jul..2000 307 2650 265(3 1070 3650 0 0 70 !1~ 520 3650 0 533 3650 770 0 1750 1770 0 0 £ 0 0 12 22..Jul.'2000 469 2875 2875 1067 3650 0 0 70 112 534 3650 0 533 3650 730 0 t750 1775 0 0 £ 0 0 C '23-J ui.-200','~ 478 2900 2925 1045 3650 0 0 70 1121 535 3650 0 521 3650 725 0 1750 1750 0 0 O' 0 0 · ':1.,,-vl-?n:O0. _, 491 2950 29512 1057 3650 0 0 60 114 548 3650 13 528 3650 725 0 1750 1750 0 0 0 0 0 25..Jut-2000 482 2950 295C 1045 3650 0 0 60 114 549 3650 ~ 520 3650 750 0 1750 1750 0 0 0 0 0 ?.6..J ut-.2000 631 3000 300C 1054 3650 0 0 60 115 557 3650 C 525 3650 700 0 1750 1750 0 0 0 0 0 27-Jv'1.2000 794 3100 3150 1053 3650 0 0 75 118 564 3650 ¢ 531 3650 700 0 1750 1750 0 0 022 2000 28-Jul-2000 924 3250 3250 1058 3650 0 0 75 118 575 3650 C 535 3650 650 0 1750 1750 0 0 0 431 2600 29..J ul..2000 929 3300 3300 1036 3650 0 0 75 119 552 3650 12 510 3650 60(3 0 1700 1700 0 0 0 777 2800 ( 30.-Jui.'2000 1033 3350 3350 1049 3650 0 0 75 117 557 3650 12 513 3650 5513 0 1700 1700 0 0 0 979 2900 ( 31 -J c'-t-2000 1079 3400 3350 1044 3650 13 0 75 117 555 3650 12 511 3650 525 0 1700 170~3 0 0 0 1040 3000 TOTAL 7,895 30,990 0 15,516 14,405 0 0 3,249 MAXIMUM 3,400 3,350 3,650 0 75 135 3,650 0 3,675 950 1,900 1,900 0 0 3,000 0 AVERAGE 255 1,751 1,772 1,000 3,623 0 0 73 113 501 3,618 0 465 3,652 806 0 1,810 1,804 0 0 0 105 429 0 # DAYS 13 31 0 31 31 0 0 5 08/08/2000 A33-14 down due to annular communication problem. Form 10.403 submitted to AOGCC on 11/I 9/1999. Began injection on 7/27/00 after successful rig job. Form 10-404 to be submitted within 10 days. A34-14RD II down to reduce pressure on A33-14. Form 10-403 submitted to AOG-CC on 11/19/1999. Began injection on 7/19/00 atler repair of A33-14. Form 10-404 to be submitted within I0 days. A23-01 R shut in to lower the pressure on A33-14 per Production Superintendent Doug Marshall. J ~m¢,- 2000 :!:i:!:i:i:!:!:!:!:i:!:i:i:i:i:!:!:i:i:i:i:i O1-.J un.2000 02,.Jun..2000 03 -.lun-2000 04-J'un-2000 05.dun-.2000 06...1'un- 20(~) 07-Jun-2000 08-Jun-2000 09..J'tm .2000 I O. Jun.-2000 1 l-Jun-2000 12-Jun-2000 13.Jun-2000 14..Jun- 2000 15-Juzt-2000 16-Jun-20o0 17-Jun.2000 18,-Jun--2000 1 20-J~m-2000 2 ! .J un-2000 22..Jun.2000 23-Jun-2000 24-Jun-2000 25-Jim.2000 26.Jun-2000 27-Jtm-2000 28-Jm~-2000 29dun~2000 30..Jun. 2000 TOTAL MAXIMUM AVERAGE # DAYS WATER INJECTION REPORT PLATFORM A I I DISPOSAL WELL A34-14 A41A-IILN A44~11 ACT ACT ACT I 0 1000 105£ 1055 3600 30 0 75 89 0 1000 105( 1051 3600 45 0 75 89 0 1000 105( !058 3600 55 0 75 83 0 1000 105( 1038 3600 80 0 75 83 0 1000 105( 1042 3600 130 0 75 92 Al 1-13R2 ACT INJ ISJ AN'NU 491 3600 486 3600 490 3600 484 3600 487 3600 AIl-12 I A23-01R AC~ ACT ]NJ ]NJ ANNU ]NJ ] ]NJ ANNU I 489 3600 350 1075 3600 360£ 486 3600 350 1069 3600 360( 490 3600 350 1078 3600 360( 478 3600 375 1056 3600 360( 477 3600 400 1056 3600 360( A12~12 A33-14 ACT ACT I 0 0 01 0 1760 1760I 0 0 01 0 1760 1760I 0 0 01 0 1760 1760I ~ 00 ~l ~ 1776600I17766~1 0 1000 105( 0 1000 1O0( 0 980 1025 0 980 1025 0 980 1025 0 980 I000 0 980 1000 0 980 1000 0 970 1000 0 970 1000 0 970 1O00 0 970 1000 0 970 1000 0 970 1000 0 970 1000 0 970 1O00 0 960 1000 0 940 1000 0 960 1000 0 950 1000 0 940 100fl 0 940 I00~ 0 940 100~ 0 940 100C 0 940 lO0C 0 1,000 1,050 0 972 1,013 1045 3600 115 1028 3600 130 1034 3600 160 1028 3600 185 1041 3600 185 1030 3600 200 1026 3600 225 1022 3600 230 1036 3600 235 1034 3600 235 1008 3600 235 1008 3600 235 1004 3600 235 995 3600 235 994 3600 235 993 3600 235 985 3600 36C 991 3600 358 983 3600 35{ 981 360O 375 984 3600 405 972 3600 417 989 3600 435 984 3600 415 980 3600 415 0 75 92 0 75 92 0 70 92 0 70 92 0 70 92 0 70 92 0 70 9~ 0 75 951 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 75 95 0 70 97 0 75 98 0 75 98 0 75 99 0 75 100 0 75 I00 0 75 102 0 75 102 0 75 102 30,419 3,600 435 1,014 3,600 240 0 75 102 0 74 95 489 3600 471 3600 462 3600 452 3600 463 3600 451 3600 440 3600 433 3600 444 3600 458 3600 459 3600 452 3600 · 454 3600 452 3600 457 3600 466 3600 471 3550 488 3550 496 3550 500 3550 509 3550 518 3550 536 3600 544 3600 548 3600 14,351 3,600 478 3,590 482 3600 400 473 3600 400 473 3675 400 472 3675 400 479 3675 400 474 3650 425 471 3650 425 469 3650 425 478 3650 425 481 3650 425 495 3650 40¢ 501 3650 60C 498 3650 58C 493 3650 58C 492 3650 68C 492 3650 68C 485 3650 755 489 3675 76( 484 3675 775 482 3675 775 483 3650 790 478 3650 800 484 3650 800 482 3650 800 479 3650 800 14,489 3,675 800 483 3,643 551 1066 3600 3600 1041 3600 3600 1051 3700 3625 1046 3700 3625 1060 3700 3625 1042 3700 3625 1040 3700 3625 1043 3700 3625 1060 3700 3625 1058 3700 3600 0 3700 2700 0 2500 2500 0 2500 2400 0 2300 2300 0 2300 2200 0 2300 220~ 0 2200 215fl 0 2100 210~ 0 2100 205¢ 0 2075 205£ 0 2O00 2005 0 2000 200( 0 2000 1975 0 1950 1950 0 1900 1900 15,841 3,700 3,625 528 2,958 2,889 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 1760 176G 0 1760 176C 0 1750 175¢ 0 1750 175C 0 1750 175C 0 1750 175C 0 1750 175£ 0 1750 175£ 0 1750 175£ 0 1750 17hr 0 1750 0 500 0 400 375 0 350 300 0 300 280 0 300 280 0 280 280 0 1600 1600 0 1660 1660 0 0 405 400 · 0 0 68 100 0 0 9 19 0 1600 160~ 0 1600 10G 0 100 0 0 1,760 1,760 0 0 1,241 1,188 0 07/1012000 A33-14 down due to annular communication problem· Form 10403 submitted to AOGCC on 11/19/1999. A34-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on 11/19/1999· A23-OIR shut in to lower the pressure on A33-14 per Production Superintendent Doug Marshall. ;~Jas~a Oil & G~s Cons. ~mmi~on WATEIR INJECTION REPORT PLATFORM A  d;r, 2000 [ A34-14 ~i~ii;ii~::~ib~?:!::i::i::i::ili::?:h- ,~J 1~ AN~U 0t .M:ty.2000 I 0 ii00 1130 tC..M ay..2000 I 0 1050 I 100 ~ .M ay-2000 0 1050 1100 04-May-200o ,;~5--M ay--2000 t~6. M ay. 2000 0':-M ay--~000 0~:- M ay-2000 09.May.2000 l 0..M ay.-2000 I 1 .May.2000 12-M ay-200(~ 13..M ay.-2000 14.May.2000 15 May..200o 16-May..2000 17.May.2000 ] 8.-M 19-May-2000 20-May-2000 21 .-May..2000 '22.bla~-2000 23..May.-200o 24.May-2000 25-May-2000 26..M a?20tR) 27-Muy.2000 2g-May-200. 2S..May-.2000 30. May. 31 -M av-20C~,') TOTAL MAXIMUM AVERAGE #DAYS 06/14/2000 A41A-IILN ACT [ INJ INJ [ ANNU I 984 3575- 90 993 3600 105 1004 3600 25 DISPOSAL WELL A44- I I ACT[ 1NJ [ INJ AN]qU 0 70 7~ 0 70 8C 0 70 7~ Al 1-13R2 ACT I INJ INJ ANNU 503 3600 5O7 3600 520 3600 I Al 1-12 [ A23-01R AI2-12 I ACT I I I ACT ACT INJ 1NJ IANNU[ ~, i INJ iAgOl INS I ~, I ANNU t 424 3600 260 1060 3600 35751 o o' o 4423~ 33~ 226600 :007813 336600~ 335577551~ ~ 0 1060 I100 1040 !100 1040 II00 1060 II00 1060 II00 1060 II00 1050 i100 1050 II00 1050 II00 1050 I100 1050 I100 1050 II00 1050 II00 1030 1075 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 1050 IOlO 1050 1010 1050 1000 1050 10OO 1050 1000 1040 I000 1040 I000 1040 0 1,100 1,130 0 1,041 1,077 0 989 3600 40 974 3600 40 937 3600 155 982 3550 95 984 3550 85 1005 3600 95 982 3575 55 1000 3575 55 996 3575 105 992 3575 120 993 3575 125 1000 3575 100 .987 3575 100 I000 3575 150 994 3575 150 994 3575 150 1003 3575 150 1008 3575 150 994 3575 150 I000 3575 150 1005 3575 150 · 1001 3600 250 968 36OO' 28O 1036 3600 25 1037 3600 45 1035 360O 65 1044 3600 35 1057 '3600 10 30,978 3,600 280 999 3,584 106 0 5O 8C 0 50 8C 0 50 78 0 50 8C 0 70 8C 0 70 81 0 70 0 70 81 0 70 82 0 70 83 0 70 83 0 70 0 70 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 85 0 70 8'~ 0. 70 8'~ 0 70 88 0 70 8S 0 70 8S 0 70 0 70 89 0 67 83 512 3600 510 3600 387 3600 422 3600 417 3600 438 3650 458 3600 459 3600 449 3600 448 3600 459 3600 469 3600 467 3600 471 3600 474 3600 472 3600 479 3600 482 3600 470 3600 475 3600 48O 36OO 476 3600 484 3600 491 3600 482 3600 476 3600 497 360O 499 3600 14,633 3,650 0 472 3,602 0 428 3600 300 415 3600 300 388 3600 325 453 3600 300 461 3600 300 481 3650 300 495 3625 275 496 3625 275 489 3625 300 482 3625 300 486 3625 300 489 3650 300 480 3650 300 483 3625 300 482 3625 300 478 3625 300 480 3625 300 480 3625 300 47O 3625 300 473 3625 300 473 3625 300 469 3600 340 461 3600 340 456 3600 35O 458 3600 350 457 3600 360 484 3600 360 495 36O0 350 14,428 3,650 360 465 3,615 307 1066 3600 36001 1021 3600 3600 883 3600 3600 1009 3600 3600 1010 3600 3575 1058 3650 3550 1057 3650 3600 1068 3650 360ff 1059 3700 3600! 1055 3700 3600! 1063 3675 3600! 1063 3675 360C 1066 3675 360( 1065 3650 360C 1063 3650 3600 1058 3650 3600 1062 3650 3600 1065 3650' 360C 1043 3650 360C 1052 3650 360( 1057 3650 3600 1047 3600 3575 1035 3600 3575 1024 3600 3575 1034 3600 3575 1044 3600 3575 1064 3600 3575 1088 3600 3575 32,493 3,700 3,600 1,048 3,631 3,590 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 .I o ,8o0 ,82~ 0 1760 180C 0 1760 180C 0 1750 180C 0 1750 180C 0 1750 179C 0 1750 179C 0 1750 178C 0 1750 178C O. 1750 178C 0 1750~ 178C 0 1750 178C 0 1750 178C 0 1750 '~ 0 1750 0 1780 ,,~ 0 1780 178C 0 1780 178C 0 1780 178~ 0 1780 178C ~ 0 1780 178C 0 1780 178C 0 1750 178C 0 1750 178( 0 1750 178( 0 1730 177C 0 1730 177( 0 1730 177f 0 1730 177( 0 1,800 i ,8201 0 ! ,760 1,785 0 A33-14 down due Io annular communication problem. Form 10-403 submitted to AOGCC on I 1/19/1999. A34-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on 11/19/1999. WATER INJECTION REPORT PLATFORM A I Ap~i~-2ooo ] ^3~44~ 01 -Apr-2000 02-Apr-2000 03-Apr-2000 04-Apr-2000 05-Apr-2000 06-Apr-2000 07-Apr-2000 08-Apr-2000 09-Apr-2000 I 0-Apr-2000 I I-Apr-2000 12-Apr-2000 13-Apr-2000 14-Apr-2000 15-Apr-2000 16-Apr-2000 17-Apr-2000 18-Apr-2000 19-Apr-2000 20-Apr-2000 2 I-Apr-2000 22-Apr-2000 23-Apr-2000 24-Apr-2000 25-Apr-2000 26-Apr-2000 27-Ap~-2000 28-Apr-2000 29-Apr-2000 30-Apr-2000 TOTAL MAXIMUM AVERAGE #DAYS 05/I 0/2000 170 120¢ 170 120C 170 120C 160 1200 160 120£ 150 120£ 150 120C 140 120C 140 120C 140 1200 140 1200 140 120C 165 llTC 160 116C 160 116C 130 116C 160 115C 160 11SC 150 115C 150 115C 150 115C 150 115C 150 !15C 150 115C 150 115C 150 115C I00 1130: IO0 1130: 100 Il30 100 1130' o 1,170 1,200 o 1,146 1,169 0 3csq - 441A-I I LN i DISPOSAL WELL 444- I I 1072 3575 10 1017 3575 8 1060 3575 18 1039 3575 23 1088 3575 17 1067 3600 20 1075 36O0 20 1053 3600 20 1058 360O 20 1051 3600 25 1050 36O0 25 1041 3600 25 1045 3600 40 1045 3600 45 1048 3600 551 1040 3600 39 1047 3600 331 1043 3600 30 1046 3600 35 1040 3600 35 1033 3600 35 1032 3600 35 1025 3600 35 1018 36O0 35 1006 3600 35 1004 3600 35 1009 3575 60 1002 3575 60 1002 3575 85 .987 3575 90 0 70 77 0 70 76 0 70 78 0 70 7~ 0 70 7~ 0 75 7~ 0 75 75 0 75 78 0 75 78 0 75 78 0 75 78 o 75 78 0 70 79 0 75 80 0 75 81 0 75 77 0 75 77 0 75 76 0 75 77 0 75 77 0 75 0 75 7'~ 0 75 7'~ 0 75 7'/ 0 75 0 75 0 70 73 0 70 71] 0 70 7~ 0 70 7~ o 75 8 0 73 77 o AII-13R2 [NJ [NJ ANNU 514 3600 488 3600 505 3600 494 3600 498 3600 488 36OO 500 3600 490 3600 492 3600 490 36O0 475 3600 463 3600 460 3500 458 3500 467' 3500 487 3510 500 3525 494 3525 469 3510 453 3510 461 3510 463 3510 467 3510 481 3510 486 3510 487 3510 497 3600 505 3600 5O0 36O0 496 3600 14,528 3,600 484 3,558 30 AIl-12 0 400 3600 20C 0 379 3600 20C 0 392 3600 20C 0 398 3600 210 494 3600 175 488 3600 175 489 3600 200 0 474 3600 200 0 472 3600 2001 0 465 3600 20C 0 463 3600 20C 0 456 3600 20C 0 451 3640 21C 0 450 3600 21C 0 448 3600 225 0 445 3650 225 0 449 3650 21C 0 441 ~650 20C 0 442 3600 225 0 437 3600 225' 0 439 3600 250 0 439 360O 250 0 437 3600 250 0 436 3600 250 0 432 3600 250 431 3600 250 432 3600 250 431 3600 250 428 3600 25O 424 3600 26O 13,262 0 3,650 260 0 442 3,606 220 3O A23-01R ACT I [Ns [ [N IA u 1151 3600 3575 1097 3600 3575 141 3600 3575 101 3600 3575 143 3600 3575 120 3600 360C 132 3600 3600 II0 3600 360C 114 3600 360G 102 3600 360~ 126 3600 3600 t08 3600 3600 109 3700 360C 108 3600 359~ i13 3650 360~ 112 3600 36O0 117 3600 360~ 103 3650 3600 115 3600 360C 106 3600 360£ Il03 3600 360C Il04 3600 360C 1100 3600 360£ 1099 3600 360£ 1087 3600 360£ 1082 3600 360£ 1080 3600 3575 1076 3600 3575 1074 3600 3575 1060 3600 3575 AI2-12 ACT [NJ I [NJ ]ANNU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 o 33,193 3,7o0 3,6oo 1,106 3,607 3,592 30 31,143 3,600 90 1,038 3,593 35 30 433-14 ::) tt%l ., [NJ [NJ ANNU 0 1800 1800 0 1800 1840 0 0 1810 1840 0 .0 1800 186~ 0 0 1800 .186~ 0 0 1825 184C 0 0 1800 184~ 0 0 1800 1840 0 0 1800 1840 0 0 1800 1840 0 o 1800 1840 0 0 1800 1840 0 0 1800 '~0 0 0 1800 o o 18oo Is~c o o 1775 1820 0 0 1800 1820 0 0 1800 181~ 0 o 18oo 181C 0 1800 I81C 0 1800 180C 0 1800 180C 0 1800 180C 0 1800 185C o 1800 185¢ 0 1800 185C 0 1800 182C 0 1800 182C 0 1800 182C 0 1800 182C 0 0 1,825 1,860 0 0 1,800 lg28 0 433-14 down due to annular communication problem. Form 10403 submitted to AOGCC on I 1/19/1999. A34-14RDII down to reduce pressure on 433-14 Form 10-403 submitted to AOGCC on l 1/19/1999 WATER INJECTION REPORT PLATFORM A March-2000 01 -Mar-2000 02-Mar-2000 03 -Mar-2000 04-Mar-2000 05-Mar-2000 06-Mar-2000 07-Mar-2000 08-Mar-2000 09-Mar-2000 10-Mar-2000 1 l-Mar-2000 12-Mar-2000 ! 3-Mar-2000 14-Mar-2000 15-Mar-2000 16-Mar-2000 17-Mar-2000 18-Mar-2000 19-Mar-2000 20-Mar-2000 21 -Mar-2000 22-Mar-2000 23 -Mar-2000 24-Mar-2000 25-Mar-2000 26-Mar-2000 27-Mar-2000 28-Mar-2000 29-Mar-2000 30-Mar-2000 31 -Mar-2000 TOTAL MAXIMUM AVERAGE # DAYS 04/12/2000 A34-14 ACT[ I INJ ANNU I 0 1350 1260 0 1260 1300 0 1270 1300 0 1260 130C 0 1260 130¢ 0 1260 1300 0 1240 128C 0 1240 1270 0 1240 1300 0 1240 1275 0 1240 130C 0 1230 1275 0 1220 1275 0 1210 1275 0 1210 125¢ 0 1210 1275 0 1210 125c 0 1200 125c 0 1200 125c 0 1200 125¢ 0 1200 125C 0 1200 125C 0 1200 125¢ 0 1200 1250 0 1150 125¢ 0 1150 1250 0 1180 125£ 0 1200 1250 o 1200 125£ 0 !180 1225 0 1170 120£ 0 1,350 1,3oo o 1,219 1,265 0 A41A-11LN DISPOSAL WELL A44-11 ACT INJ { ]NJ ANNU 1119 3550 0 1097 3575 0 0 70 76 1007 3575 0 0 70 7( 1517 3575 0 0 70 543 3575 0 0 70 1146 3575 0 0 70 74 !133 3575 0 0 70 7{ !135 3575 0 0 70 7~ 1102 3575 0 0 75 i114 3600 0 0 75 75 1109 3575 0 0 75 75 1102 3600 0 0 75 7~ i102 3575 0 0 75 7~ 1096 3575 0 0 75 7~ Illl 3575 0 0 75 7~ 1095 3575 0 0 75 7~ 1088 3575 0 0 75 1096 3575 ~0 0 75 78 1094 3575 0 0 75 78! 1094 3575 0 0 75 75 1084 3575 0 0 70 75 1097' 3575 0 0 70 75i 1085 3575 0 0 70 75 1086 3575 0 0 72 75 1083 3575 0 0 70 78: 1082 3575 0 0 70 78 1082 3575 0 0 70 78 1076 3575 0 0 70 78 1077 3575 0 70 78 1078 3575 0 70 78 1072 3575 0 70 77 33,802 3,600 0 1,090 3,576 0 A11-13R2 ]NJ 01 ]NJ 75[ ANN~8801 INJ5261 ~00I~ 0 75 80 0 72 76 0 516 3600 468 3600 397 3600 538 3600 550 3600 546 3600 544 3600 538 3500 543 3500 541 3500 532 3500 537 3500 526 3500 543 3500 527 3500 522 3500 525 3500 520 3500 525 3500 518 3500 526 3500 519 3500 521 3500 521 3500 524 3500 534 3500 524 3500 524 3500 518 3600 517 3600 16,210 3,600 0 523 3,532 Al 1-12 A23-01R A12-12 A33-14 ACT . ACT ACT [ACT[ 1 ]NJ482[ ]N~6001 Al~150[ INJII29[ ]N~6501 ~001 ]NJ 01 1NJ 01 A~'tU0l INJ 0[ INJ30{AiN~8~01 474 3600 150 411 3600 145 376 3600 210 504 3600 100 509 3600 100 502 3600 100 502 3600 100 492 3600 125 495 3600 100 490 3600 125 484 3600 125 482 3600 ,125 476 3600 150 482 3600 150 472 36O0 150 464 3625 150 465 3625 150 456 3625 150 450 3625 150 440 3625 125 439 3625 125 430 3625 125 424 3625 125 421 3600 170 419 3600 170 416 3600 170 408 3600 170 404 3600 170 401 3600 150 401 3600 145 1116 3600 3575 1041 3600 3575 1143 3600 3500 1250 3600 3550 1232 3600 3575 1210 3600 3560 1207 3600 3575 1180 3525 3550 1186 3550 3575 1186 3550 3575 1175 3550 3575 1170 3550 3575 1169 3550 3575 1184 3550 3575 !169 3650 3575 1162 3650 3575 1179 3650 3575 1176 3650 3575 1176 3650 3575 1161 3650 3575 1180 3650 3575 1166 3650 3575 1165 3650 3575 1162 3650 3550 1164 3650 3550 1193 3650 3550 1125 3650 3550 1151 3650 3550 1147 3600 3575 1149 3600 3575 36,203 3,650 3,600 1,168 3,612 3,567 0 0 0 0 33 1860 0 0 0 0 29 1860 O 0 0 0 27 1850 0 0 0 0 27 1840 0 0 0 0 30 1850 0 0 0 0 33 1840 0 0 0 0 28 1850 0 0 0 0 28 1840 0 0 0 0 28 1840 0 0 0 0 35 1840 0 0 0 0 38 183¢ 0 0 0 0 38 0 0 0 0 38 0 0 0 0 35 184~ 0 0 0 0 35 1820 0 0 0 0 39 1820 0 0 0 0 38 1820 0 0 0 0 33 1810 0 0 0 34 182¢ 0 0 0 34 181¢ 0 0 0 34 1810 0 0 0 36 1810 0 0 0 36 181¢ 0 0 0 35 180C 0 0 0 35 180C 0 0 0 35 180C 0 0 0 35 1800 0 0 0 35 180C 0 0 0 28 180C 0 0 0 23 180( 0 0 0 0 39 1,860 0 0 0 0 33 1,825 0 0 14,071 3,625 210 454 3,606 140 A33-14 down due to annular communication problem. Form 10403 submitted to AOGCC on 11/19/1999. A34-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOC,-CC on 11/19/1999. RECEIVED APR : 000 Alaska Oil & Gas Cons. Commission WATER INJECTION REPORT PLATFORM A DISPOSAL WELL ~brua~-2000 A34-14 A41 A- I I LN A44- I I A I I - 13 R2 A I I - 12 A23-01R A 12-12 A33-14 ':':':':':':':':':':':':':':':':':':':' ACT ACT ACT ACT ACT ACT ACT ACT ' !~ ~i~i ~ i i ~ i i !i il INJ INJ ANNU INJ [NJ ANNU [NJ INJ ANNU [NJ INJ ANNU INJ [NJ ANNU [NJ [NJ ANNU INJ [NJ ' ANNU [NJ [NJ ANNU ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: OI-Feb-2OO0 O 1450 1450 1096 3575 0 0 75 77 454 3550 0 429 3600 200 1123 3650 355~ 0 0 O! 0 20 1150 02-Feb-2000 0 1450 1450 1104 3575 0 0 75 77 456 3550 O 430 3600 200 1124 3650 355C O O 0 O 20 1150 03-Feb-2OOO 0 1400 1440 IO70 3575 O O 70 8£ 439 3600 0 384 3600 200 IO89 3600 3575 0 O O! 0 21 1170 04-Feb-2000 0 1400 1440 1088 3575 0 0 70 8( 439 3600 0 0 2900 370 Il09 3600 3575 0 O 0 O 27 1240 O5-Feb-2000 0 1400 1425 1080 3575 0 0 70 7~ 437 3600 0 0 2850 450 1098 3600 3575 0 O 0 0 24 1180 O6-Feb-2OOO 0 1400 1425 IO89 3575 0 0 70 79 438 3600 0 0 2850 500 1106 3600 3575 0 0 0 0 24 1790 07-Feb-2000 0 1400 1425 943 3575 0 0 70 7~ 370 3600 0 469 2850 500 1015 3600 3575 0 O 0 0 27 1840 08-Feb-2000 0 1400 1425 1105 3500 0 0 70 78 381 3550 0 474 3550 200 1102 3550 350~ 0 O 0 0 26 1850 09-Feb-2OOO 0 1370 1400 IIIO 3550 0 0 70 78 460 3600 O 488 3600 175 1103 3600 3525 0 0 0 0 23 1860 lO-Feb-2000 0 1370 1400 1120 3550 0 0 70 78 519 3600 0 498 3600 150 1118 3600 3575 0 O O 0 25 186C II-Feb-2OO0 0 1360 1400 1123 3550 0 0 75 78 525 3600 0 496 3600 175 1121 3600 3575 0 0 0 0 25 186C 12-Feb-2000 0 1350 1400 1098 3550 0 0 75 78 490 3600 0 482 3600 150 1096 3600 3575 0 0 O 0 25 186C 13-Feb-2000 0 1340 1400 IIO! 3550 0 0 75 78 483 3600 0 480 3600 150 1100 3600 3575 0 0 O O 25 18~' 14-Feb-20OO 0 1340 14OO IlOi 3550 0 0 75 78~ 479 3600 0 481 3600 150 1107 3600 3575 0 O O 0 25 15-Feb-2000 0 1320 1400 IO64 3550 0 0 75 755 493 3600 0 482 3600 150 I111 3600 3575 0 O O 0 22 1860 16-Feb-2000 0 1320 1350 I103 3550 0 0 75 7~ 493 3600 0 474 . 3600 150 1102 3600 3575 0 O O O 25 1860 17-Feb-2OOO 0 1320 1375 IIO0 3550 0 0 75 75 490 3600 0 471 3600 150 IlOI 3650 3575 0 0 0 ' 0 25 1850 18-Feb-2000 0 1310 1375 1105 3550 0 0 75 7~ 507 3600 0 470 3600 150 1124 3650 3575 0 O 0 O 22 1850 19-Feb-2OO0 0 1320 1375 1140 3575 0 O 75 78 538 3600 0 499 3650 150 1154 3650 3575 0 O 0 0 23 1850 20-Feb-20OO 0 1310 1375 1121 3600 0 0 75 78! 507 3600 0 490 3650 150 1131 3650 3575 0 0 O 0 28 1850 21-Feb-2000 0 1300 1375 1123 3600 0 0 75 81 518 3650 0 497 3650 150 1139 3650 3575 0 0 O 0 28 185~ 22-Feb-2OOO O 1300 1350 1725 3600 O 0 75 8( 521 3600 0 498 3650 125 1137 .3700 3575 0 0 0 0 28 185~ 23-Feb-2000 O 1300 1350 537 3600 0 0 75 8( 527 3600 O 503 - 3650 125 Il51 3650 360C O 0 O O 28 185C . 24-Feb-2000 0 1300 1350 1122 3600 0 0 75 80 529 3600 0 497 3650 150 1137 3650 355¢ 0 0 O 0 28 184~ 25-Feb-2OO0 0 1300 1350 1118 3600 0 0 75 80 532 3600 O 494 ' 3650 150 1130 3650 355( 0 O 0 0 28 184C 26-Feb-2000 0 1300 1350 1121 3600 0 0 75 80 534 3600 0 494 '-3650 150 1131 3650 355( 0 0 0 0 28 184¢ · 27-Feb-2000 0 1300 1350 1114 3600 0 0 75 80 529 3600 0 486 3650 150 1122 3650 355( 0 0 0 0 28 184C 28-Fcb-2000 0 1300 1350 Il13 3600 0 0 75 80 536' 3600 0 484 3650 150 1122 3650 3550 0 O 0 0 28 184C 29-Feb-2000 0 1350 126fl IIIO 3550 ~ 0 75 80 533 3600 0 481 3600 150 1120 3650 3550 0 0 0 0 28 184~ TOTAL O 31,944 0 14,157 12,431 32,323 0 O ' MAXIMUM 1,450 1,450 . 3,600 0 75 81 3,650 0 3,650 500 3,700 3,600 O O 28 1,860 · AVERAGE O 1,348 1,387 1,102 3,571 0 O 74 78 488 3,597 0 429 3,514 199 I,I 15 3,626 3,565 0 0 0 0 25 1,732 # DAYS 0 29 0 29 26 29 0 0 03/09/2000 ;- 1-3 down due to annular communication problem. Form 10-403 submitted to AC)GCC on 1 I/I 9/1999 ;-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on I I/I 9/1999. ' ~ WATER INJECTION REPORT PLATFORM A DISPOSAL WELL Janua~-2000 A34-14 A41A-I ILN A44-1 I Al 1-13R2 Al 1-12 A23-01R Al2-12 A33-14 01-Jan-2000 0 1750 1650 Ill0 3600 0 0 74 76 458 3500 0il 441 3600 15C 1151 3650 345C 0 0 0 '~. 0 0 800 02-Jan-2000 0 1750 '1650 1102 3600 0 0 75 76 461 3500 0! 434 3600 15C 1139 3650 345C 0 0 0 0 0 800 03-Jan-2000 0 1750 1650 1105 3600 0 0 75 76 469 3500 0i 432 3600 15C 1137 3650 345C 0 0 00 0 800 04-Jan-2000 0 1700 1650 1094 3600 0 0 75 76 464 3500 0 426 3600 175 1135 3650 345C 0 0 0 0 0 750 05-Jan-2000 0 1700 1650 !122 3600 0 0 75 76 490 3500 0 400 3600 175 1142 3650 345C 0 0 0 0 0 750 06-Jan-2000 0 1560 1575 1086 3575 0 0 70 76 485 3600 0 445 3600 17£ 1113 3600 3575 0 0 0 0 0 900 07-Jan-2000 0 1550 1575 II01 3575 0 0 70 76 492 3600 0 417 3600 190 1124 3600 3575! 0 0 0 0 0 900 08-Jan-2000 0 1575 1575 1098 3575 0 0 70 78 498 3600 0 4'15 3600 175 1124 3600 3575: 0 0 0 0 0 900 09-Jan-2000 0 1575 1575 1098 3575 0 0 70 78 494 3600 0 369 3600 200 1122 3600 3575 0 0 0 0 0 900 10-Jan-2000 0 1575 1575 II01 3575 C 0 70 76 501 3600 0 383 3600 220 1127 3600 3575 0 0 0 0 0 975 II-Jan-2000 0 1575 1575 1091 3575 C 0 70 76 503 3600 0 397. 3600 200 1123 3600 3575 0 0 00 0 90C 12-Jan-2000 0 1575 1575 1131 3575 C 0 70 76 530 3600 0 419 3600 200 1157 3600 3575 0 0 0 0 0 95~ 13-Jan-2000 0 1500 155~ 1095 3600 ~ 0 75 76 515 3600 0 409 3600 200 !122' 3600 3600 0 0 0 0 C 14-Jan-2000 0 1500 155~ 1113 3600 C 0 75 78 518 3600 0 416 3600 200 1134 3600 3600 0 0 00 t. 15-Jan-2000 0 1500 155~ IlOI 3600 C 0 75 78 504 3600 0 414 3600. 200 il27 3600 3600 0 0 0 0 0 900 16-Jan-2000 0 1500 1550 1097 3600 ~ 0 75 78 472 3600 0 415 3600 200 1125 3600 3600 0 0 0 0 0 900 17-Jan-2000 0 1500 1550 Il02 3600 ~ 0 75 78 480 3600 0 421 3600 200 1138 3600 3600 0 0 0 0 0 900 18-Jan-2000 0 1500 155~ 1095 3600 ~ 0 75 78 477 3600 0 419 3600 200 1129 3600 3600 0 0 0 0 0 950 19-Jan-2000 0 1500 155~ 1084 3600 C 0 75 78 474 3600 0 414 3600 200 1115 3600 3600 0 0 0 0 0 95~ · 20-Jan-2000 0 1450 150~ 1109 3600 C 0 75 80 478 3600 0 424 3650 200 1138 3650 3575 0 0 0 0 0 98~ 21-Jan-2000 0 1450 150~ I100 3600 C 0 75 78 484 3500 0 424 3600 200 1132 3650 3575 0 0 0 0 0 90C 22-Jan-2000 0 1425 150~ 1101 3600 C 0 75 79 481 3550 0 422 3600 200 !132 3650 3575 0 0 0 0 0 89~ 23-Jan-2000 0 1425 150C 1094 3600 £ 0 75 81 481 3550 0 420 3600 200 1126 3650 3575 0 0 0 0 0 89C 24-Jan-2000 0 1425 150~ 1091 3600 £ 0 75 81 471 3550 0 417 3600 200 i119 3650 3575 0 0 ~ 0 0 98~ · 25-Jan-2000 0 1420 150£ 1107 3600 0 0 75 79 482 3550 0 426 3600 200 1136 3650 3575 0 0 C 0 0 90£ 26-Jan-2000 0 1420 1475! 1106 3575 : 0 0 75 77 493 3550 0 428 3600 200 1143 3650 3575 0 0 C 0 0 875 27-Jan-2000 0 1450 1450 1102 3575 0 0 75 77 482 3550 ~ 425 3600 200 1132 3650 3550 0 0 £ 0 0 925 28-Jan-2000 0 1450 1450 1099 3575 0 0 75 7~ 479 3550 ~ 425 3600 200 '1129 3650 3550 0 0 0 0 0 29-Jan-2000 0 1450 1450 II01 3575 0 0 75 7~ 476 3550 ~ 429 3600 20~ 1131 3650 355~ 0 0 0 0 0 90( 30-Jan-2000 0 1450 1450 1114 3575 0 0 75 7~ 493 3550 C 434 3600 20C 1142 3650 355~ 0 0 0 0 0 90{ 31-Jan-2000 0 1450 '1450 1082 3575 0 0 75 7~ 467 3550 C 420 3600 20C 1109 3650 355C 0 0 0 0 0 95( TOTAL 0 34,132 0 15,052 12,980 35,053 0 0 MAXIMUM i,750 1,650 3,600 0 75 81 3,600 0 3,650 220 3,650 3,600 0 0 0 98~ AVERAGE 0 i ,529 i ,544 I, I 01 3,590 0 0 74 77 486 3,565 0 419 3,602 192 1,131 3,627 3,5561 0 0 0 0 0 # DAYS 0 31 0 31 31 31 0 0 02/10/2000 \33-14 down due to annular communication problem. Form i 0-403 submitted to AOGCC on I I/I 9/I 999. ..\ ~4-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on I 1/19/1999. WATER INJECTION REPORT PLATFORM A . · I December-99 ] A34-14 I 01 -Dec-99 02-Dec-99 03-Dec-99 04-Dec-99 05-Dec-99 06-Dec-99 07-Dec-99 08-Dec-99 09-Dec-99 I 0-Dec-99 I I -Dec-99 12-Dec-99 13-Dec-99 14-Dec-99 15-Dec-99 16-Dec-99 17-Dec-99 18-Dec-99 19-Dec-99 20-Dec-99 21 -Dec-99 22-Dec-99 23-Dec-99 24-Dec-99 25-Dec-99 26-Dec-99 27-Dee-99 28-Dec-99 29-Dec-99 30-Dec-99 31 - Dec-99 TOTAL MAXIMUM AVERAGE # DAYS 01/13/00 0 1925 1925 0 1900 1900 0 1900 1900 0 1900 1900 DISPOSAL WELL A4 i A-I ILN A44-11 Al 1-13R2 Al 1-12 ACT ACT ACT INJ INJ A~U INJ INJ A~ INJ l~IJ A~ INJ INJ AN~J I i 17 3550 01 0 70 86] 481 3500 465 3575 20(; 1108 3550 O 0 70 861 458 3500 460 3575 20C I i ! I 3550 0 O 70 861 453 3500 463 3575 20(; I I i0 3550 0 O 70 86 456 3500 O 460 3575 2001 0 1900 1900 0 1900 1900 0 19OO 1850 0 1800 1800 0 1800 1825 0 1800 1825 0 1800 1800 O 1775 1775 0 1775 1775 0 1775 1775 O 1750 175C 0 1750 175C 0 1800 1750 O 1800 1750 0 1750 1750 1104 3550 0 1117 3550 1099 3550 1109 3550 IO87 3550 IIOI 3550 1106 3550 !104 3550 1108 3550 IO87 355O !107 3550 i115 3550 1098 3550 1114 3550 ilOI 3550 0 70 86 0 70 86 O 70 86 O 7O 86 O 70 86 0 70 86 0 70 81 0 70 82 0 70 80 O 70 79 0 70 82 0 80 82 0 80 8C 0 80 0 80 79 0 1775 1725 0 1750 1700 O 1750 1700 O 1750 1700 O 1750 1650 O 1750 1650 0 1750 1675 O 1750 1675 0 17OO 165C 0 1750 165C 0 1750 165C 0 1750 165C o 1,925 1,925 o 1,796 1,764 0 1097 3550 1113 3650 i113 3550 1113 3550 1120 3575 1127 3575 1108 3575 1099 3575 il04 3575 1122 3575 1114 3575 illO 3600 34,343 3,650 1,108 3,560 31 0 0 80 8c 0 O 80 8(; 0 O 80 80 0 0 70 79 O 70 79 O 70 77 0 70 80 O 70 79 0 70 81 O 70 79 0 70 77 0 74 76 o 80 86 o o 72 82 o 463 3500 471 3500 471 3500 547 3500 459 3600 557 3600 532 3600 51~4 3600 511 3600 487 3600 493 3600 494 3245 490 3400 495 3400 480 3400 484 3450 512 3450 5O4 345O 495 3500 501 35OO 501 3500 479 3500 465 3500 470 3500 474 3500 467 3500 461 3500 15,125 3,600 488 3,500 31 456 3575 200 461 3575 200 456 3575 20O 460 3575 200 451 3600 20O 459 3600 200 456 3600 200 456 3600 200 458 3600 200 447 3600 200 452 3600 · 200 455 3575 200 450 3575 200 453 3575 150 442 3550 15C 445 3575 20C 463 3600 15£ 459 3600 150! 461 3600 175 467 3600 150 468 3600 150 454 3600 150 446 3625 150 447 3625 175 456 3600 150 451 3600 150 445 3600 15G 14,122 3,625 200 456 3,590 181 31 A23-01R AI2-12 I I I I 3600 3450 0 0 i 120 3600 3450 0 0 I I ! 8 3600 3450 0 0 1107 3600 3450 0 0 I 124 3600 345C 0 0 I 11 I 3600 345C 0 0 I I 18 3600 345(; 0 0 1106 3600 3425 0 0 I 118 3600 3425 0 0 I 117 3600 343(; 0 0 I 113 3600 345(; 0 0 1127 3600 3430 0 0 1104 3600 3460 0 0 1121 3600 3430 0 0 1134 3650 · 3450 0 0 I i 14 3650 3450 0 0 1130 3650 3450 0 0 i 108 3650 3450 0 0 i 120 3650 3450 0 0 1149 3650 3500 0 0 1142 3650 34513 0 0 1146 3650 34513 0 0 1158 3650 3475 0 0 1164 3650 3475 0 0 1136 3650 3475 0 0 1127 3650 3475 0 0 · 1136 3650 3450 0 0 1169 3650 3450 0 0 I 157 3650 3450 0 0 i 151 3650 3450 0 0 34,977 3,650 3,500 1,128 3,626 3,452 31 o o o o o A33-14 0 0 97:I 0 0 10001 0 0 0 95O 0 0 0 950 o 0 0 9513 0 0 925 0 0 925 0 0 925 0 0 95C 0 0 9613 0 0 ~,75 0 0 ~)0 0 0 1025 0 0 105C 0 0 105( 0 0 100( 01 0 0 975 0 0 0 975 0 0 0 925 0 0 0 9OO 0 0 900 0 0 925 0 0 90(: 0 0 90C 0 0 85C 0 0 85C 0 0 85C 0 0 85C 0~ 0 0 800 0 0 0 ! ,050 0 0 0 ~41 o ,33-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on I 1/19/1999. ~34-14RDII down to reduce pressureon A33-14. Form 10-403 submitted to AOGCC on 11/19/1999 WATER INJECTION REPORT PLATFORM November-99 OI-Nov-99 02-Nov-99 03-Nov-99 04-Nov-99 05-Nov-99 06-Nov-99 07-Nov-99 08-Nov-99 09-Nov-99 I O-Nov-99 I I -Nov-99 12-Nov-99 13-Nov-99 14-Nov-99 15-Nov-99 16-Nov-99 17-Nov-99 18-Nov-99 19-Nov-99 20-Nov-99 21 -Nov-99 22-Nov-99 23-Nov-99 24-Nov-99 25-Nov-99 20-Nov-gq 27-Nov-Oq 2g-Nov-09 29-Nov-99 30-Nov-99 TOTAL MAXIMUM AVERAGE # DAYS 12/I 3/99 A34-14 796 3500 3475 814 3600 3600 830 3550 3600 830 3600 3600 829 3600 3600 816 3600 3600 820 3600 3600 820 3600 3600 830 3600 3600 833 3600 3600 826 3600 360C 855 3600 360C 825 3600 ~360~ 833 3600 360~ 852 3600 360~ 841 3600 360~ 846 3600 36OC 853 3600 360~ 5OI 2600 26OG 0 2300 23OG 0 2250 225C 0 2150 215C 0 2125 2125 0 2075 2075 0 2020 2020 0 2020 2000 0 2050 2000 0 2000 1975 0 2000 1950 0 1950 1950 15,450 3,600 3,600 515 3,006 3,002 19 DISPOSAL WELL A41A-I ILN A44-1 I 1117 3500 121 3550 142 3550 131 3600 131 3600 119 ' 3600 120 3600 Il8 3600 129 3600 125 3550 1044 3550 il13 3550 ~0! O 70 93 0 70 91 0 70 90 0 70 90 0 70 90 0 70 90 0 70 90 O 70 9O 0 70 90 0 70 90 0 70 91 0 70 91 1091 3550 1107 3550 1134 3550 1119 3550 1125 3550 1132 3550 1102 3550 1089 3550 Il13 3550 Il14 3550 IO93 3550 1107 3550 1140 3550 1104 3550 Illl 3550 1124 3550 1097 3550 1127 3550 33,432 3,600 I,II4 3,558 3O 01 0 70 91 0~ 0 70 91 0 0 70 88  0 70 89 0 70 89 O 0 75 88 0 0 75 90 0 0 75 90 0 0 75 90 0 0 75 '90 0 0 75 90 0 0 75 88 0 0 70 87 0 70 8~ 0 70 86 0 70 86 0 70 86 0 70 86 AII-13R2 ACT [ INJ I INJ ANNU I 0 0 75 93 0 0 71 89 0 553 3500 672 35OO 618 3500 589 3600 AIl-12 479 3525 225 492 3575 175 498 3575 175 495 3600 150 A23-01R Al2-12 II10 3600 34001 0 0 1133 3650 34501 0 o 1155 3656 3'450[ 0 0 Il51 3600 35001 '0 0 545 3600 603 3600 576 3600 582 3600 567 3600 564 35O0 572 3600 620 3600 578 3600 582 3600 656 3600 667 3600 647 3600 613 3600 437 3600 546 3450 531 3450 408 3500 513 3500 509 3500 493 3600 150 484 3600 150 485 3600 175 483 3600 175 490 3600 175 490 3600 175 486 3600 60 500 3600 50 482 3600 40 485 3600 50 497 3600 40 493 3600 20 492 3600 10 496 3600 150 458 3600 150 458 3575 200 472 3600 200 473 3600 200 463 3600 200 443 3600 20C 1521 3600 503 3500 493 3500 516 3500 489 3500 507 3500 17,777 3,600 593 3,550 30 479 3600 20£ 465 3575 225 466 3575 225 470 3575 200 461 3575 200 472 3575 200 14,400 ' 0 3,600 225 0 480 3,591 175 30 149 3600 3500 131 36OO 3500 138 3600 3450 131 3600 3450 143 3600 3450 138 3650 3450 140 3600 3450 171 3600 3450 131 3600 3460 140 .3600 3440 167 3600 3450 153 3600 3475 156 3600 3450 166 3600 3450 097 3600 3475 100 3575 3450 125 3550 3450 121 3600 3450 107 3600 3450 105 36O0 3450 !145 3600 3450 1108 3600 3450 1114 3600 3450 1124 3600 345£ 1104 3600 3475 1130 3600 3450 33,983 3,650 3,500 1,133 3,603 3,456 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 0 1275 1275 0 1050 1075 0 950 I000 0 I000 1000 0 I000 I000 0 I000 I000 0 I000 I000 0 I000 I000 0 !000 I000 0 800 800 01 0 850 850 o~ 0 450 475 Oi 0 200 )025 O' 0 2b ~075 Oi 0 20 1850 Oi 0 20 1150 OI 0 20 1050 0 :0 0 II00 O 0 O 950 0 0 0 1000 0 0 0 950 O 0 0 900 0 0 0 900 0 0 0 850 0 0 850 0 0 85C 0 0 925 0 0 925 0 0 100( 0 0 975 0 0 2,000 2,075 0 0 449 ~60 0 A33-14 down due to annular communication problem. Form 10403 submitted to AOGCC on 11/19/1999. -~34-t4RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on I 1/19/1999. ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 2ROSS TIMBERS OPERATING COMPANY Name of Operator MIDDLE GROUND SHOAL Field and Pool DAILY AVERAGE .: November-99 Month and Year of Injection TOTAL MONTHLY 1. 2. 3. 4. Well # APl # Type Field & 50- Pool Code TUBING PRESSURE CASING PRESSURE INJECTION INJECTION 5. 6. 7. 8. 9. 10. 11. 12. 13. Method Days in MAX Average ' MAX Average Liquid Gas Liquid Operation PSIG PSIG PSIG PSIG (BBL) (MCF) (BBL) hll-12 7331008300 4 . 524114 6 30 3,600 3,591 225 175 480 14,400 14 Gas (MCF) ~ll-13R2 7332000701 4 524114 6 hi2-12 7332004400 4 524114 6 h23-01R 7332023801 4 524114 6 h33-14 7332005700 4 52~114 6 &41A-IILN 7332017903 4 524114 6 ~34-14 7331008601 4 524114 6 C23-23 7332010200 4 524114 6 E23-26 7332007100 4 524114 8 C24-23 7332014501 4 524114 6 C34-23 7332004100 4 524114 6 C41-23 7332016300 4 524114 6 C41-26 7332040900 4 524114 8 C24A-23 7332040100 4 524114 6 A44-Ii 7332002700 5 524036 9 C4414RD 7332025201 5 524036 9 30 3,600 3,550 0 0 0 0 0 30 3,650 3,603 3,500 0 2,000 449 2,075 30 3,600 3,558 0 19 3,600 3,006 3,600 30 3,500 3,440 3,110 0 50 50 0 30 3,500 3,499 3,500 30 3,560 3,549 0 0 750 715 650 0 645 637 450 30 3,500 3,498 140 0 75 71 93 0 0 129 550 0 0 3,456 1,060 0 3,002 3,108 0 3,500 0 .650 450 115 89 550 593 0 1,133 0 1,114 515 1,374 0 391 1,965 0 0 125 0 0 17,777 0 33,983 0 33,432 15,450 41,207 0 11,729 58,942 0 0 3,741 0 0 I hereby certify that the foregoing is tnle and/q~ect to the best of my knowledge. Total 230,661 Title: Office Manager Date: I 0-Dec-99 Form 10406 t:onn 10-406 Rev 07~27~99 Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: IX] Abandon [ ] Suspend [X] Plugging [ ] Time Extension [ ] Perforate [ ] Alter Casing [ ] Repair Well [ ] Pull Tubing [ ] Variance [ ] Other [ ] Change Approved Program [ ] Operation Shutdown [ ] Re- Enter Suspended Well [ ] Stimulate 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) CROSS TIMBERS OPERATING COMPANY [X] Development 116' DF [ ] Exploratory 3. Address [ ] Stratigraphic 7. Unit or Property Name 3000 N. GARFIELD, SUITE 175, MIDLAND, TEXAS 79705 ~l~,Service Middle Ground Shoal 4. Location of well at surface M" v"" ~' /~J'~'~'7 ~-~/,t 8. Well Number 1569' FSL, 381' FEL, Sec. 11, T8N, R13W, SM~"'~ A23-01 RD .... At top of productive interval 9. Permit Number 1554' FSL, 2099' FWL; Sec. 1, T8N, R13W, SM 187-093 At effective depth 10. APl Number ~/, 2579' FSL, 1760' FWL, Sec. 1, T8N, R13W, SM 50-733-20238-01 At total depth 11. Field and Pool 2611' FSL, 1742' FWL, Sec. 1, T8N, R13W, SM Middle Ground Shoal 12. Present well condition summary Total depth: measured 11,550 feet '/ Plugs (measured) None true vertical 8,821 feet Effective depth: measured 11,440 feet Junk (measured) None true vertical 8,739 feet Casing Length Size Cemented MD TVD Structural Conductor Surface 2,393' 13-3/8" 1,940 sx 2,393' 2,215' Intermediate 8,080' 9-5/8" 1,200 sx 8,080' 6,123' Production 11,358' 7" 980 sx 11,538' 8,812' Liner Perforation depth: measured 9,878' - 11,270' (10 intervals) True vertical 7,556' - 8,614' (10 intervals) Tubing (size, grade and measured depth) 3-1/2", N-80 at 9.748' Naska 0il & ,a, rx;horaq(- Packers and SSSV (type and measured depth) 7" Baker Model FB-1 permanent packer at 9,701' 13. Attachments [X] Description of Sumary Proposal [ ] Detailed Operations Program [ ] BOP Sketch 14. Estimated date for commencing operation 15. Status of well classification as: 5/15/01 16. If proposal was verbally approved [ ] Oil [ ] Gas [ ] Suspended Name of approver Date Approved Service: Water Iniection Well Contact Engineer Name/Number: Bill Penrose, 258-3446 Prepared By Name/Number: Bill Penrose, 258-3446 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ ,~~ Title: Bobby L. Smith, Drilling / Operations Manager Date ~/1~'/O ¢ / Commission Use Only Conditions of Approval: Notify Commission so representative may witness ..~. ~,.~ ~1~)1~ ..~ % ~ I Approval No...~ ~.-~,~ Plug integrity__ BOP Test ~ Location Clearance Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission .~ i~ I-i~l~.~_~,~r Commissioner Date Form 10-403 Rev. 06/15/88 Subr~ Triplicate Cross Timbers Operating Company MGS A23-01RD __ I'&A l'roceaure M~e rig over well. I~tall BPV, N~ tree, N~ BOPE. Test BOPE to 5,000 psi. ~ote: at the discretion of the Drill~g Supe~isor ~d AOGCC Inspector (if presem), blind rams will be tested after tub~g is pulled ~om hole if there is a c~nce a gas bubble will settle under BPV, makro it difficult or dangerous to release.1 ~ll well by bul~ead~g 12.0 ppg water-base mud to peffs. Monitor ~ulus to assured oftub~g and packer seal ~te~ity. ~ land~g jolt to tub~g ~nger, back out lock-dom screws and pull hanger to drill floor. Ckculate water out of a~ulus by pump~g mud do~ the tub~g and out the Remove tub~g hanger ~d use e~ra jolts of 3-1/2" tub~g to ~H until seals have re- engaged ~ the packer. Abandon exist~g perforated ~te~al by bul~ead~g 340 cu. ~. of cement below packer. Cement plug should e~end ~om the packer at 9,701' to 11,370', 100' ~low the ~om perforation. P~ until seals ~e clem of the packer ~d reverse out tub~g. E~ure well is deM aM POH wkh tub~g, check~g for NO~ while POH. L~ tubing ~d completion jeweky and seM to shore. P~ a 6" bk and 7" c~g scraper on 3-1/2" &ill pipe, ~H ~d tag the pemnem packer at 9,701' ~. Press~e test cement plug ~d cas~g to 3,000 psi. Displace 12.0 ppg mud ~ hole wkh 9.0 ppg water-base mud. POH and proceed with sidetrack proced~e m drill ~3-01LW. '.CroSS :~'mber.~,~-erating Company Present Completion- MGS A23-01RD WIW Cook Inlet, Alaska Leg 4, Conductor 32 APl No.: Spud: Surf Csg: 13 3/8", 61 lb,. J55. Set @ 2393'. Cmt'd w/1940 BX. Prod Csg: 9 5/8", 47 lb, N80. Set @ 8080'. Cmt'd w/1200 BX. Liner Csg: 7", 26 lb, N80. Set @ 0-9989'. 7", 32 lb., Pl10. Set @ 9989'-11538'. Cmt w/980 BX. PBTD: TD: 11440' (WL) (Flagjoints @ 9904', 10315', 10621') 11550' KB: Water Depth: Tubing: 3 1/2", 9.3, N80 8rd AB-Mod EUE @ 9748'. 10000~ DB W'I' On Locat0r 90000~ UP WT 62000~ DN WT 3 1/2" Otis "X" Nipple @ 304' 3 1/2" Otis "X" Nipple @ 9667' MD (7381' TVD) '. Baker Seal Assembly w/11.85' of Seals @ 9700' MD (7408' TVD) Baker Fa-1 permanent Packer@ 9701' MD (7409' ' ' ' TVD) Baker 9.34' Sealbore Ext. @ 9704' MD (74'11' 'I'VD) Otis "XN" Nipple @ 9746' MD (7443' TVD) ~' . Baker Wireline Re-entry Guide ~;~ 9748' MD (7~.~.' TVD) '. . GN-GO: 9878'-9899" GR-GS: 10235'-10251' ' ~ · GR-GS: 10261 '-10290' HC-HD: 10531 '-10572' HC-H D: 10593'-10636' HE-HF: ~10651'-10682' HI-HK: Not Perforated HK-HN: 10783'-10914' H N-H R: 10929'-11072' HR-HZ: 11096'-11119' HR-HZ: 11121'-11270' All Perfs from 9878'-11119' w/Atlas 2 1/8" Silver Jet 4 SPF..' Perfs from 11121'-11270' WI 2 5/8" x. 2 1/8" HCI BG 4 SPF. Perfs from 11240'-11260' were rep~rfed on 6/21/88. . January 30, 2001 Ms. Julie Heusser, Commissioner Alaska Oil and Gas Conservation Commission 333 West 7a Ave., Suite 100 Anchorage, Alaska 99501 RE: Request for Variance BOP Arrangement Dear Commissioner Heusser, Cross Timbers Operating Company requests a variance from 20AAC25.035(e): Blowout Prevention Equipment and Diverter Requirements for its workover and drilling operations on Platforms A and C in Cook Inlet. This variance is being requested per 20AAC25.035(h). Request Cross Timbers requests authorization to utilize a BOP stack that consists of an annular preventer, one blind ram and one variable bore ram in lieu of the annular preventer and three rams required in the AOGCC's regulations. The approved BOP arrangement currently on file with the Commission is for a 5,000 psi WP annular preventer, one set of 5,000 psi WP blind rams and 2 each sets of 5,000 psi WP pipe rams. The requested stack arrangement would contain a 5,000 psi WP annular preventer, one set of 5,000 psi WP blind rams and one set of 5,000 psi WP variable-bore rams. The proposed BOP components and arrangement provide an equally effective means of well control as the currently permitted arrangement. Rationale This variance is being requested because the lack of vertical space in the rigs' subbases on these small platforms do not permit the installation of a 3-ram stack. Only a two-ram stack is short enough to fit. Background Cross Timbers began planning to work over wells on Platform C and re-drill others on Platform A shortly after the platforms' purchase from Shell Oil Company in October 1998. Rig work was permitted and commenced in the summer of 2000. The BOP stack arrangement that was submitted to the Commission and approved prior to the start of work was a standard 3-ram stack. Upon attempting to install the stack under the rig on Platform C, it was found to be too tall to fit. The Commission was contacted and it was verbally agreed that a 2-ram stack could be used as long as one ram was a blind ram and the other was a pipe ram that always had rams fitted to the pipe being run into and out of 21 0 Park Avenue, Suite 2350, Oklahoma City, Oklahoma 73102-5605 (405) 232-4011 Fax (405) 232~5538 Ms. Julie Heusser 1/31/01 Page 2 the hole. This worked well as no tapered strings were used during the workovers on Platform C. When the workovers were finished, operations and equipment, including the BOP stack, were moved to Platform A to commence the drilling program there. The same BOP arrangement was used since the same headspace constraints apply as on Platform C and there were initially no tapered strings used. However, on the current well a tapered drilling string is necessary and Commission representatives pointed out that the stack no longer meets requirements. We made inquiries as to how Shell operated when they last drilled on this platform in the mid-90's and found that they used a single set of variable- bore rams in lieu of 2 single pipe rams. Cross Timbers has now installed variable-bore rams with the verbal concurrence of the Commission, but a formal review and approval of this BOP arrangement by the Commission is necessary. Also, we would like to have the new stack arrangement diagram placed on file with the Commission, to replace the one currently on file. Please find enclosed a new BOP diagram, which, if approved, should replace the diagram currently on file with the Commission. If you have any questions or require additional information, please contact me at (405) 319-3213 or Bill Penrose at (907) 258-3446. Sincerely, CROSS TIMBERS OPERATING COMPANY Susan I. Sudduth Sr. Engineering Technician Mid-Continent Division enclosure CC2 Bill Penrose Doug Marshall Doug Schultze CROSS TIMBERS OIL COMI'ANY BOP COMPONENTS MIDDLE GROUND SHOAL FIELD PLATFORMS "A" AND "C" KILL LINE 2", 5000 .PSI WP MANUAL GATE VALVE 13-5/8", 5000 PSI WP HYDRIL GK ANNULAR PREVENTER W/ COMPANION FLANGE TO BELL NIPP DOUBLE 13-5/8", 5000 PSI WI ~'~,... SCHAFFER SL BOP W/ '" BLIND RAMS ON TOP AND <.:..~..~-~-2-7/8" X 5" VARIABLE BORE RAMS ON BOTTOM ' ~, CHOKE LINE . 3 , 5000 PSI WP GATE VALVE W~ 5000 PSI WP MANUAL GATE VALVE 5000 PSI WP RISER i- / / ~DSA: 13-5/8",. 5000 PSI WP' ~X 11", 5000 PSI WP 2':, 5000 PSI WP MANUAL GATE VALVE ' 13-5/8", 5000 PSI WP DRILLING SPOOL W/ TWO 3", 5000 PSI WP OUTLETS Cross Timbers Operating Company April 18, 2001 Ms. Julie Heusser, Commissioner Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval; P&A of MGS Well A23-01RD, Cook Inlet, Alaska Dear Commissioner Heusser, Cross Timbers Operating Company hereby applies for Sundry Approval of its plan to permanently abandon the perforations existing in Middle Ground Shoal Well A23-01RD to allow the sidetracking of that well to drill A23-01LW. The Application for Permit to Drill A23-01LW is submitted under separate cover. The anticipated commencement date of this work is approximately May l 5. The perforations will be abandoned by pumping sufficient cement through the existing tubing below the permanent production packer. The tubing will then be recovered, the packer and plug integrity verified and the well sidetracked to a new location in the reservoir. Cross Timbers requests continuation of the variance from the BOPE requirements of 20AAC25.035(e) as requested in our letter of January 30, 2001 (copy attached). The rationale is the same as was set out in that letter. Pertinent information attached to this application includes the following: 1) Form 10-403 Application for Sundry Approval 2) A copy of the proposed abandonment procedure 3) A schematic showing the current condition of the wellbore 4) A copy of the January 30, 2001 BOPE variance request If you have any questions or require additional information, please contact me at (915) 620-6718 or Bill Penrose at (907) 258-3446. 3000 North Garfield, Suite 175, Midland, Texas 79705 (915) 682-8873 Fax (915) 687-0862 Ms. Julie Heusser Page 2 Sincerely, CROSS TIMBERS OPERATING COMPANY Bobby L. Smith Drilling/Operations Manager enclosures CC: Bill Penrose Doug Marshall Mike Langeler Charles Pope Cross Timbers Operating Company MGS A23-01RD P&A Procedure ~,,%~ ~_~x-,~ ~. x / M~ve ~g over we~._ Instan BPV, N~ tree, Nm BOPE. Te~ BOPE to 5,000 psi. ~ote: ( a~he ~cretion of the Dffil~g Supe~isor ~d AOGCC Impector (~present), b~d r~ ~ w~l ~ te~ aRer tub~g is pulled ~om hole ff there is a e~ce a g~ bubble w~l se~le . ~ ~d~rBPV, m~gitdiffic~tor~gero~tor~le~e.l ~~ ~x~'~ ~ ~~~ ~k~ Xx ~11 well by bulhead~g 12.0 ppg water-b~e mud to peffs. Moffitor ~ulus to ~ ~ed ofmb~g ~d packer seal ~te~ity. M/U landing joint to robing hanger, back out lock-down screws and pull hanger to drill floor. Circulate water out of annulus by pumping mud down the tubing and out the annulus. Remove tubing hanger and use extra joints of 3-1/2" tubing to RIH until seals have re- engaged in the packer. Abandon existing perforated interval by bullheading 340 cu. tt. of cement below packer. Cemem plug should extend from the packer at 9,701' to 11,370', 100' below the bottom perforation. P/U until seals are clear of the packer and reverse out tubing. Ensure well is dead and POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry and send to shore. P/U a 6" bit and 7" casing scraper on 3-1/2" drill pipe, RIH and tag the permanent packer at 9,701' MD. Pressure test cement plug and casing to 3,000 psi. Displace 12.0 ppg mud in hole with 9.0 PPg water-base mud. POH and proceed with sidetrack procedure to drill A23-01LW. MICROFILMED 9/28/00 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE November 12, 1996 Alaska Oil & Gas Conservation Commission ATTN: Blair Wondzell 3001 Porcupine Drive Anchorage, AK 99501 Blair: Shell Western E&P Inc. An affiliate of Shell Oil Company HCO1 Box 485 Kenai, AK 99611 (907) 776-5241 RECEIVED NOV 1 4. 1996 Alaska 0il & Gas Cons. Commsssion Anchorage SUBJECT: SUBMITTAL OF APPLICATION FOR SUNDRY APPROVAL (FORM 10-403) TO CONTINUE INJECTION OPERATIONS ON MGS WELL A23-01 Enclosed in triplicate is the Application For Sundry. Approval to continue injection operations on Middle Ground Shoal (MGS) well no. A23-01. SWEPI notified the AOGCC of pressure communication observation between the injection tubing and casing via telephone conversation with you today. JUSTIFICATION Pressure communication was observed and confirmed via annulus pressure observations. Injection rate and pressure have been monitored closely since identification of the problem and have not indicated a problem with casing integrity. A summary of the daily injection from May 1, 1996 to November 11, 1996 is attached. Also attached is the monthly injection history for the same period - note mechanical integrity was last verified by MIT on November 27, 1992. Note that the injection rate and pressure has remained constant indicating that injection is being contained with the target interval. SWEPI will continue to monitor injection rate and pressure on a daily basis and injection operations will be shut down immediately if the injectivity increases significantly for unexplained reasons. Necessary data. for monitoring the injectivity is reported monthly on AOGCC form 10-406. Additionally, daily injectivity data is submitted to you, in compliance with AOGCC letter dated November 6, 1992. REQUEST FOR APPROVAL Based upon the above information and justification, we request approval to continue injection operations on MGS A23-01 by way of Administrative Relief provided by Rule 9 of Area Injection Order (AIO) No. 9.5 (dated 10/21/91), for a variance to Rule 6(b). mechanical integrity of the casing will be monitored and demonstrated on a daily basis via injectivity indications. Please notify us of approval or any required action to continue injection operations. If you have any questions or wish to discuss further, please call me at (907) 776-2540. Sincerely, M. G. Dunckley Maintenance Foreman Attachments STATE OF ALASKA OIL AND GAS CONSERVATION COM ~--~r"!ON APPLIC, TION FOR SUND Y AF, .qOVALS I1.Type of Recluest: Abandon __ Suspencl __ Alter caang ! Reomr we~l __ Change apDrovecl orogram , -2. Name of Operator 5. Type of Well: Devetooment Shel! ~'~estern E&? Inc. , Exoloratory__ 3. Acldress Strat~graon,c HC01 gox 485 Kena 4. Locatlon of well at sudace Platforiil "A", Leg 4, Conductor 28, 63.45'5 & 56.79'E-from Leg 1@16.27'N & 435'W of SE cnr Sec ll,TSN,R13W. At top of productive interval @ 9867'. 52.51'N & 25.26'E of surface location. At effective depth Oper~on ~utclown __ Re-enter suspenaecl welt __ Plugging __ 'rime.~r~tenaon __ Stimulate __ Vanance z~. Perforate __ Other __ Pull tubing -- At total depth @ 11550'. 62.83'N & 21.72'E of surface location. 12. Present well conclition summary Total deoth: measured 115 5 0 feet Plugs (measured) true ve~cal 8812 feet Effective depth: measured 11440 feet Junk (measure(i) true veracal 8733 feet Casing Length Size Cemented Structural 'Conductor Surface 2393' 13-3/8" 1940 sx Intermediate 8080" 9-5/8" 1200 sx Production 9989' 7" Liner 1549' 7" 980 sx Perforation depth: measured 9878' - 11270' 10 Intervals 6. Datum elevaaon (OF or KB) 116' DF 7. Unit or Property name Hiddle Ground Shoal & Well number A23-01 ~ 9. Permit numt3er 87-93 10. APl numl3er 5o- 733-20238-01 11. Field/Pool M.G.S Measured depth "A' Pool 0-2393' 0-8080' 0-9989' 9989-11538' truever~ca 7561' - 8605' feet True vemcaJ dep~ (61#, J-55 BTC) (47#, N-80 BTC) (26#, m-80) (32#, m-llO) ORIGINAL Tuio,ng(size. grade, and mea~ured depth) 3-1/2", 9.3#, N-8rd AB-,od EURE ~"7B'V E D Packers and SSSV (type and measurecl depth) Baker FB-1 Packer @ 9701' NOV 1 4 1996 13. Attachments Oescnption summary of proposal __ Oetalecl operations program __ BOP sketch __ Alaska 011 & Gas Cons. commission I .... ~-) ¢;/x¢/¢-~' ~"'-~~' Title ;4aintenance Foremen Date 11/12/96 '1 Approved by order of the Commissioner Form 10-403 Rev O6/15/88 Commissioner · '- veCI ~opy 4,-~turne¢ 2 5 6 7 COMPLETION EQUIPMENT DETAIL SHEET MGS A23-OiRD - 2/13/89 NO. · ITEM TVD. MD. 1. 3 1/2" OTIS "X" NIPPLE 2. 3 1/2" OTIS "X" NIPPLE 3. BAKER SEAL ASSEMBLY w/ 11.85' Of SEALS 4. BAKER FB-1 PERMANENT PACKER 5. BAKER 9.34' SEALBORE EXT. 6. OTIS "XN" NIPPLE 304 304 7381 9667 7408 9700 7409 9701 7411 9704 7443 9746 7. BAKER WIRELINE RE-ENTRY GUIDE' 7444 9748 CASING 13 3/8", 61#, J-55 @ 2393' w/1940 sx 9 5/8", 47#, N-80 @ 8080' w/1200 sx 7" 26#, N-80 0-9989' 32#~ P-110 9989-11538' W/980 sx FLAG JOINTS AT 9904',10315',10621' PBTD : 11,440' (WL) TD = 11,550' RECEIVED NOV 1 4 1996, TUB I NG Alaska 011 & Gas Cons, Commission Anchorage 3 1/2", 9.3#, N-80 8rd AB-Mod EUE @ 9748' PERFORATED ZONE GROSS INTERVAL (MD) GN-GO 9878-9899' GR-GS 10235-10251' GR-GS 10261-10290' HC-HD 10531-10572' H¢-HD 10593-10636' HE-HF 10651-10682' HI-HK NOT PERFORATED HK-HN 10783-10914' HN-HR 10929-11072' HR-HZ 11096-11119' HR-HZ 11121-11270' NOTE- iO,O00N DN WT ON LOCATOR 90,000# UP WT 62,000# DN WT ALL PERFS FROM 9878-11119' W/ ATLAS 2-1/8" SILVER JET 4 SPF. PERFS FROM 11121-11270' W/ 2-5/8" x 2-1/8" H.C./B.G. 4 SPF. PERFS FROM 11240-11260' WERE REPERFED ON 6/21/88. A23-01 Injection Data 4000 3500 3000 2500 2000 1500 1000 5OO -*- Injection Volume (bbl) Surface Casing (psig) -a- Annulus Pressure (psig) ~ Casing Pressure (psig) r., Injection Pressure (psig) A23-01 Date Injection Volume (bb Surface Casing (psi Annulus Pressure (psi 5/1/96 1213 5 80 5/2/96 1220 0 70 5/3/96 1240 2 80 5/4/96 1244 0 90 5/5/96 1160 0 150 5/6/96 1136 0 160 5/7/96 1132 0 130 5/8/96 746 0 40 5/9/96 1500 0 50 5/10/96 1349 0 65 5/11/96 1300 0 65 5/12/96 1202 0 80 5/13/96 1216 0 80 5/14/96 1185 0 60 5/15/96 1148 0 90 5/16/96 1302 0 90 5/17/96 1326 0 90 5/18/96 1279 0 90 5/19/96 704 0 55 5/20/96 492 0 55 5/21/96 1177 0 55 5/22/96 1492 0 55 5/23/96 1492 0 50 5/24/96 1390 0 50 5/25/96 1334 0 50 5/26/96 1332 0 50 5/27/96 1344 0 60 5/28/96 1326 0 60 5/29/96 1304 0 60 5/30/96 1263 0 80 5/31/96 1266 0 90 6/1/96 1244 0 90 6/2/96 1166 0 160 6/3/96 1216 0 80 6/4/96 1143 0 200 6/5/96 1094 0 240 6/6/96 1241 0 150 6/7/96 1325 0 120 6/8/96 1295 0 120 6/9/96 1326 0 120 6/10/96 1322 0 120 6/11/96 1338 0 110 6/12/96 687 0 240 6/13/96 788 0 100 6/14/96 1459 0 100 6/15/96 1377 0 100 6/16/96 1345 0 100 6/17/96 1303 0 100 Casing Pressure (psi Injection Pressure (psi 80 3650 64 3600 67 3650 70 3600 90 3550 90 3600 90 3600 50 3650 55 3700 60 3700 60 3700 65 3700 65 3700 60 3700 70 3650 70 3700 70 3700 70 3700 40 3700 40 3700 40 3700 40 3700 40 3800 30 3800 30 3800 30 3800 50 3800 N(~ 1 4 199£365o365° Alaska Oil,~as Cons. commissioit650 ~U~nchorage 3600 70 3700 120 3550 130 3500 100 3700 90 3700 90 3700 90 3700 90 3700 90 3700 120 3700 140 3600 140 3650 140 3650 140 3650 140 3650 Page 1 Date Injection Volume (bb Surface Casing (psi 6/18/96 1278 0 6/19/96 1288 0 6/20/96 1297 0 6/21/96 1280 0 6/22/96 1268 0 6/23/96 1259 0 6/24/96 1248 0 6/25/96 1218 0 6/26/96 1222 0 6/27/96 1141 0 6/28/96 1201 0 6/29/96 1235 0 6/30/96 1261 0 7/1/96 1175 0 7/2/96 1203 0 7/3/96 1194 0 7/4/96 1177 0 7/5/96 1190 0 7/6/96 1202 0 7/7/96 1183 0 7/8/96 1177 0 7/9/96 1176 0 7/10/96 1163 0 7/11/96 1102 0 7/12/96 1255 0 7/13/96 1163 0 7/14/96 1111 0 7/15/96 1165 0 7/16/96 1180 0 7/17/96 1082 0 7/18/96 1140 0 7/19/96 1087 0 7/20/96 1085 0 7/21/96 1137 0 7/22/96 1120 0 7/23/96 1126 0 7/24/96 1130 0 7/25/96 1096 0 7/26/96 1121 0 7/27/96 1074 0 7/28/96 1094 0 7/29/96 1104 0 7/30/96 765 0 7/31/96 1270 0 8/1/96 1188 0 8/2/96 1154 0 8/3/96 1120 0 8/4/96 1163 0 8/5/96 1195 0 Annulus Pressure (psi CasingPressure(psi I~ecfionPressure(psi 170 115 3650 170 115 3650 200 125 3650 200 125 3700 205 120 3650 205 120 3700 240 150 3700 240 150 3675 240 155 3675 290 185 3650 280 177 3650 280 175 3675 260 170 3650 320 200 3600 310 185 3650 350 230 3600 225 360 3700 320 210 3700 340 215 3700 340 225 3700 340 225 3700 340 225 3700 380 235 3700 380 235 3650 330 210 3550 245 380 3600 240 380 3600 400 250 3500 430 275 3600 420 260 3500 480 300 3650 480 290 3650 480 290 3650 440 270 3650 460 260 3650 460 260 3650 460 260 3650 470 285 3600 480 310 3650 480 310 3600 470 285 3600 480 300 3600 450 230 3500 430 270 3600 460 280 3600 470 290 3600 480 295 3600 480 305 3600 460 290 3700 Page 2 Date Injection Volume (bb Surface Casing (psi 8/6/96 1167 0 8/7/96 1153 0 8/8/96 1139 0 8/9/96 1130 0 8/10/96 1126 0 8/11/96 1158 0 8/12/96 1157 0 8/13/96 1145 0 8/14/96 1161 0 8/15/96 1164 0 8/16/96 1184 0 8/17/96 1161 0 8/18/96 1130 0 8/19/96 1157 0 8/20/96 1177 0 8/21/96 1126 0 8/22/96 1068 0 8/23/96 1037 0 8/24/96 1081 0 8/25/96 1118 0 8/26/96 1081 0 8/27/96 1171 0 8/28/96 1169 0 8/29/96 1210 0 8/30/96 1146 0 8/31/96 1112 0 9/1/96 1161 0 9/2/96 1168 0 9/3/96 1136 0 9/4/96 1175 0 9/5/96 1136 0 9/6/96 1161 0 9/7/96 1109 0 9/8/96 1136 0 9/9/96 1130 0 9/10/96 1168 0 9/11/96 1167 5 9/12/96 916 5 9/13/96 1137 5 9/14/96 1082 5 9/15/96 1144 5 9/16/96 1174 5 9/17/96 1126 5 9/18/96 1033 5 9/19/96 1126 5 9/20/96 1187 5 9/21/96 1161 5 9/22/96 1203 5 9/23/96 1309 5 Annulus Pressure (psi CasingPressure(psi I~ectionP~ssure(psi 490 310 3700 520 335 3700 520 335 3700 520 335 3700 520 335 3700 500 300 3700 500 300 3700 500 310 3700 500 320 3700 500 320 3700 490 300 3700 490 300 3700 520 325 3700 500 325 3700 500 325 3700 520 325 3700 560 360 3600 550 350 3600 560 365 3600 570 350 3600 520 340 3650 500 320 3650 490 300 3700 490 305 3700 500 310 3700 500 320 3700 490 305 3700 500 315 3700 520 325 3700 500 315 3700 540 330 3600 540 330 3600 540 330 3600 540 330 3600 520 330 3600 520 330 3600 490 300 3600 500 300 3600 500 300 3600 520 325 3600 480 280 3600 480 280 3600 480 280 3600 510 320 3600 450 270 3650 450 270 3600 480 285 3550 400 235 3700 350 210 3700 Page 3 Date 9/24/96 9/25/96 9/26/96 9/27/96 9/28/96 9/29/96 9/30/96 10/1/96 10/2/96 10/3/96 10/4/96 10/5/96 10/6/96 10/7/96 10/8/96 10/9/96 10/10/96 10/11/96 10/12/96 10/13/96 10/14/96 10/15/96 10/16/96 10/17/96 10/18/96 10/19/96 10/20/96 10/21/96 10/22/96 10/23/96 10/24/96 10/25/96 10/26/96 10/27/96 10/28/96 10/29/96 10/30/96 10/31/96 11/1/96 11/2/96 11/3/96 11/4/96 11/5/96 11/6/96 11/7/96 11/8/96 11/9/96 11/10/96 11/11/96 Injection Volume (bb 1277 1141 1147 1293 1294 1301 1332 1281 1207 1061 1127 1183 1186 1193 1193 1138 1189 1267 1253 1255 1345 1274 1292 1274 1285 1242 1228 1032 639 1404 1368 1290 1249 1329 1298 1218 1182 1141 1218 1323 1295 1284 1337 1265 1280 1287 1279 1212 1148 Surface Casing(psi AnnulusPressure(psi CasingPressure(psi InjectionPressure 5 325 220 3700 5 420 240 3550 5 390 230 3600 5 310 180 3700 5 310 185 3700 5 300 175 3700 5 290 170 3700 5 280 165 3700 5 340 205 3700 5 430 255 3550 5 430 255 3650 5 350 205 3650 5 350 205 3650 5 330 205 3650 5 330 205 3650 5 340 200 3650 5 340 200 3700 5 290 150 3700 5 280 150 3700 5 220 125 37O0 5 220 125 3700 5 210 125 3700 5 200 120 3700 5 190 120 3700 5 180 120 3700 5 200 130 3700 5 240 130 3650 5 240 130 3700 5 100 65 3700 4 150 130 3700 5 160 90 3700 4 130 75 3700 5 160 90 3700 5 150 85 3700 5 150 85 3700 5 180 95 3700 5 200 110 3700 5 220 120 3700 5 220 120 3700 5 100 60 3700 5 100 60 3700 5 100 60 3700 5 100 60 3700 5 140 400 3700 5 1700 300 3700 5 1800 275 3750 5 2200 325 3750 5 3500 550 3700 5 3500 600 3700 Page 4 Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 Jan uary 17, 1990 Alaska Oil and Gas Conservation Commi ss ion 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: SUBJECT: CANCELLATION OF OUTSTANDING REPORT OF SUNDRY WELL OPERATIONS FOR MGS WELL NOS. A33-14, A12-12, A23-OIRD, A34-11, A34-14RDII, A44-11, A13-12RD AND C31-26 Enclosed are two copies of the Report of Sundry Well Operations for MGS well nos. A33-14, A12-12, A23-OIRD, A34-11, A34-14RD II, A44-11, A13-12RD and C31-26. These workovers were all cancelled and none of the work was performed. If you have any questions concerning these reports, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/raf Enclosures SBBL/aogcc. 011790 ALASKAOILANDGASCONSERVATION COMMISSION 0 R I 6 I N A REPOI OF SUNDRY WELL OPEI TIONS 1. Operations performed: Operation shutdown ~ Stimulate__ Plugging Pull tubing m Alter casing Repair well __ Perforate Other L CANCELLED 2. Name of Operator 5. Type of Well: Shell Western E&P I nco Development Exploratory 3. Address 601 West Fifth Avenue, Suite 810 Stratigraphic Service Anchoraqe, AK 99591 4. Location of well at surface Platform "A", Leg 4, Conductor 28 63.45'S & 56.79'E from Leg I ~16.27' N & 435'W of SE r e ec 11, At top of produC~,~/r~ ,F~t69rfvaJ~ TaN, R13W @'9867'. 52.51'N and 25.26'E of surface location 6. Datum elevation (DF or KB) 116' KB Unit or Property name Middle Ground Shoal 8. Well number 9. Permit numbeflapproval number 87-93 / 9-684 At effective depth At total depth 12. Present well condition summary Total depth: feet feet measured 11,550' true vertical 8,812 ' 10. APl number 50-- 733-20238-01 11. Field/Pool Effective depth: measured 11,440' feet true vertical 8,733 feet Plugs (measured) Junk (measured) feet M,_'dd]e Cre._.nd She=_~_ "A" Pee~. Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 2393' 8080' 11,538' measured 9878 ' -11,270 ' 10 Intervals true vertical Tubing (size, grade, and measured depth) Length Size Cemented Measured depth 13-3/8",61# J-55 BTC 19408x 2393' True vertical depth 9-5/8" 47# N-80 BTC 1200sx 8080' 7", 26&32#, N-80 & P-110 980sx 11538' 3-1/2", 9.3#, N-80 8rd AB-MOD EUE L~9748' Packersand SSSV (type and measured depth) FB-1 Permanent Packer L~9701 ' 13. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil ~ Gas __ Suspended Service I NJECTOR 17. I hereby certify t~the foregoing is true and correct to the best of my knowledge. Signed ~~ Title DI VIS I ON 0PERAT I 0NS MGR. Date 01/17/90 Form 10-404 Rev 06/15/88 SBBL/rswoo011590A2301 RD/1 SUBMIT IN DUPLICATE '0 Shell Western E&P Inc. ~01 West Fifth Avenue ** Suite 810 Anchorage, Alaska 99501 October 2, 1988 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: SUBJECT: SUBMISSION OF WELL COMPLETION OR RECOMPLETION REPORT FOR WELL A23-O1RD Enclosed, in duplicate, is the Well Completion or Recompletion Report for Well A23-OIRD. The completion date of this well was July 29, 1988. If you have any questions, please call Ms. Susan Brown-Maunder at 263-9613. Very truly yours, W. F. Simpson Manager Regulatory Affairs WFS/SBB/ljm Enclosures I bc: C. M. Kidwell B. N. Osborn H. A. Van Schelt SEA File= 5.6120 A23-O1RD Correspondence File: 5.91 Production File Reading Files ~nn./~nncc_Og2688 Gas Cons. Commias~u~' Anchorage I '~ ' STATE OF ALASKA · · ALASKA .?IL AND GAS CONSERVATION ~ .. 4MISSION 'WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Stitus of Well Cleuification of $1rviCI Will OIL C::] GAS [::::] SUSPENDED I~ ABANDONED D SERVICE J~ Injection 2. Nlme of O'perlt'or .... ?. Permit Number Shot! #astern E&P Inc. 87-93 . . . 3. Address .... 8, APl Number 601 #est Fifth .Avenuem Suite 810t Anchoragem Alaska 99501 5.0..-- 733-20238-01 ...... , . .. 4. Location of well at surface P]atform A~ Leg 4, Conductor 28, 63,45t5 and 56.79'E 9. Unit or Lille Name fr~ Leg 1 P 16.~27~N and 435'# of SE corner of Sec. 11~ TSN, R13W. Ntddle Ground Shoal At Top Producing Interval ~1 9,867,, 52.51 'N, end 25,26!E of surface location. 10. Well Number A23-OIRD At Total Depth ~1 1,1~550', ~2.83!N and 21.72,~E of surface location. 11. Field lnd Pool S. Eievati°n in feet (i;;dic'at, KB, DF,/etc.) 1 e. Lease DAignltion and ~;erial N~). ~ /~)/:, Middle Ground Shoal "A Pool 116' DF ' . I ADL 1875q . .. 12. Date Spudded .... 13. ~Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions . ~ 1.1/10/87 12/01/87 12/22/87~ 73* feet MSLI Sfngle 17. Total Depth (MD+TVD)' 18.Plug Back Depth {MD+ILVD)19. Directional Survey J 20. Depth where SSSV 's;t j 21. Thickness of Permafrost 11~,550' + 8t812' 11~440' + 81~.733' YESl~... NOD None.. feet MD None 22. Type Electric or Other Logs Run RFT/GRs DIL/GR, CNL.t CBL 23. CASING, LINER AI~'D CEI~ENTING RECORD i,, SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 1.3.-3/8' 61~ J'55 BT(~' ''0' 2.'393/' 17-1/2" already in place 0' 9,~5/8' 47# N-80 BTC , O' 8~080' 12-1/4" ,, already tn place O' 7" 26# N'80 O' 9t989~... 8-1/2".. . O' 7" '' ' 32#' ~ P'110 '9,989', '11,538' 8'1/2" ' 980 .sx. "G" + additives O' , , ..... 24. Perforations open to Production (MD+TVD of Top end Bott°m and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET IMD) PACKER 'SI~T IMD) 3-1/2',9.3~,N- ~0 9~70i ' ....... 8rd AB-Mod EUE 9,748' ~6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. SEE ATTACHED DETAIL SHEET DEPTH INTERVAL {MD) AMOUNT ~ KIND OF MATERIAL'USED , '11,..121'-11,270' 'i,000 gal 10~, HCI: !,000'gal HC1/HF; 12%/3%, and 1,000 gal 10~ I. IC1 ,, , · ...... 27. PRODUCTION TEST , ,, Date First Production I Method of Operation (Flowin~l, ~gas lift' etc.} None ~'Date of Test Hours Tested pRoDuCTION FOR OIL-BBL " GAS:McF WATER-BBL CHOKE'SIZE I'GAS:OIL RATIO ...... TEST PERIOD I~ ...............J --. I Flow Tubing Casing'Pressure . [CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API'Icorr) Press. ' ..... 24-HOUR RATE e ............ · 28. CC)RE DATA . ...... , ., , , ..... ,, ..... Brief deScription of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None ,, ~ ,Anchora~e ,,, 29. 3O. GEOLOGIC MARKERS FORMATION TESTS NAME Include intervll tlstld, I:t~$Url dltl, III fluids rl<:oYerld and _ MEAS. DEPTH TRUE VERT. DEPTH GOR. Ind time ot tech phew. , , , ,, , N/A N/A 31. LIST OF ATTACHMENTS Daily Report of Operations, Completion Equipment Detail Sheet 32. i herebYj~:if~. ~i flre~~g is true and correct to the best of my knowledge~ Signed ~~'-----~ Title Div. 0prns. Hgt. DIre, I~). ~t- , , INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than qqe~r~terval:(mul~iple completion), so state in item 16, and in item 24 show the producing intervals for in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.), :~,.~t'~ 0it & Gas Cons. C0mn~issi~: Item 23: Attgchecl supplemental records for this weld should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. LAND DIRECTIONAL DRIt. LING, INC .............. : SHELL WESTERN EXPLORATION & PROD. INC. ................ : NGS t~ A 2~3-01e, D ~ect!on...: N 20.00 E Declination: 2~S deq 0 mtn E name ...... : B: A2301D.DAT Com[,u t a t ! on: RAD ! US OF CURVA?URE Su=vev dote: 11/11/87 Ne thod ..... : S INGLE SHOT RKB Helclh%.: 116.0 ft RECORD OF SURVEY IP=evtous su=ve¥ doto to 8100.0l ~ DR I FT TRUVERT SUBSEA SECT I ON FH ~ IVlN DEPTH DEPTH DI ST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD )0 37 3 6133.20 6017.20 4757.57 N 23.00 E &2~27.33'N 2~2~.g5.70 E ~7 38 12 61~.18 6078.18 ~80~.2~ N 2P.00 E ~26P.S6 N 2316.30 E 57 38 30 ~3~3.1P ~227.1~ %~20.8P N 28.00 E ~373.16 N 2372.55 E ~0 38 0 ~31.~3 ~31S.P3 %~0.3~ N 25.00 E ~35.7~ N 2~03.7~ E 50 3~ 30 ~80~.0& ~0.0~ S~7%.1~ N 1~.00 E %70~.~6 N ~3.83 E de,a, ' C O.OOC 1.09~. ~e~,36 ~S 7121.44 7005.~4 SS03.30 N ~.00 E ~3~;..gS N 2526.~ E 23~,~37 0 7SOS.42 738~.42! 577~.6S N 3.00 W 522~.7~ N 2S28.~S E 92 ~0 0 7872.~2 775t.~2 ~032.08 N 13.00' ~ SS13.S1 N ~%88.37 E B~ 38 0 8100.8~ 7984.87 6180.71 N ~0.00 ~ 56~0.7~ N ~35.8~ E ~0 ~ 1S 8310.3S 817~.3S. ~313.?~ N 22.00 N SSSS.~O N ~37~.57 E ~l ~4 0 8405.~5 8~8~.~ ~37~.~5 N 23.00 N S~38.33 N ~338.33 E ~ ~3 ~5 85~3.02 8~37.0~ ~81.~ N ~S.O0 N ~O~7.~P N 2~80.8~ E ~ ~2 iS 8771.~8 86SS.~8 6~22.01 N 28.00 V ~2%9.~S N 218~.8S E SS45.8~ N 27 6 ;~ E 604~.03 N 24 17 27 E 61~'0.1~' N 23 10 ~1 E 6318.01 N 2~2 3 ~S E 638~.12 N 21 29 3S E 6~8~.0E N 20 36 6 E 6622.~ N 19 18 3~ E .732 .S31 .OEP. 1.13~ 1.S8~ 23-01 DATA INTERPOLATED FOR EVEN !00 FEET OF SUP, SEA DEPTH m-- ;. TRU VERT SUB SEA NID-TVI'J_ VERTICAL 'FI DEPTH DEPTH D I FF. CORRECT )78 6116 6000 1962 26 .~OS 6216 6100 1989 27 .~3.''j 6316 6200 2016 27 ~0 6~ 16 6300 20~ 28 586 6516 64 00 207 0 26 711 087 212 336 'S86 '71:1. '837 )220 )348 )477 ~)606 0737 0868 1005 1281 1418 6616 6816 6916 70].6 7116 7216 7316 7416 7516 7616 77:1{5 7816 7916 8016 8116 8216 8~16 8616 8716 6500 2095 25 6600 21.21 26 67 00 , 2146 25 6800 2 ].71 25 690 0 2196 25 7000 2220 2~ 7100 22~5 25 7200 2270 25 7300 2295 25 7~ 00 2321 26 7500 2348 27 7600 2376 28 7700 2~04 28 7800 2~32 28 79 00 2~61 29 8000 2~90 29 8:3.00 2521 31 8200 2552 31 8300 2589 37 84 00 2628 39 8500 2665 37 8600 2702 37 RELATIVE COORDINATES FROWI WELL-HEAD 4215.~1 N 2300.97 E ~28~.62 N 232~.62 E 4354.13 N 2:362.39 E 4~2~.~6 N 2398.~2 E ~95.1~ N 2~29.63 E 4566.79 N 2~56.17 E 4639.25 N 2~78.08 E ~712.19 N 2495.35 E ~785.1~ N 2508.85 E ~858.76 N 2519.12 E ~932.90 N 2526.15 E 5007.61 N 2530.31 E 5082.55 N '. 2532.10 E 5157.61 N 2531.50 E 5232.92 N 2528.50 E 5310.~5 N 2522.20 E 5389.01 N 2~12.07 E 5468.~2 N 2498.03 E 5548.39 N 2~79.89 E 5626.58 N 2~57.65 E 5702.26 N 5779.83 N 5860. ~2 N 59~7.22 N 6035.22 N 2~31.67 E 2~02.48 E 2370.6~ E 233~. S~ E 2L:~5.70 E 6121.06 N 620~. ~3 N 2255.3S E 2213.68 E DATA ! NTERPOL. ATED FOR EVEN 1000 FEET OF t~EASURED DEPTH MEA$. TRU VERT SUB SEA DEPTH DEPI'H DEPTH RELATIVE COORD/NATES FROM WEt. L-HEAD 1000 2~1 125 3736.36 N 3159.1~ E 2000 716 600 b337.6~ N 2966.55 E 3000 1~01 1285 ~289.99 N 2351.53 E ~000 22S0 213~ 3799.06 N 2316.20 E 5000 3205 3089 37~1.~0 N 2651.62 E ~000 ~202 ~086 ~361.~2 N 2802.05 E 7000 S173 S057 ~030.6~ N 273~.~2 E 8000 6053 S937 ~17~.57 N 2322.~6 E 9000 68~6 6730' ~73~.12 N 2~99.76 E 10000' 76~6 7530 5332.~ N 2519.7& E 11000 8~ 12 82.q6 S~.O8 N 2335.88 E A 23-01 DATA INTERPOL. ATED FOR EVEN 1000 FEET OF ~4EASURED DEPTH 1E/07/1~"/' ' MEAS. TRU VERT SUB SEA RELAT!VE COORDINATES DEPTH DEPI*H DEPTH FROIVl WELL-HEAD 1000 2~1 125 3736.36 N 3159.1~ E ~.000 7].~5 600 ~337.6~ N ~96~.55 E 3000 1~01 1285 ~28~.9~ N ~351.53 E ~000 ~250 213~ 3799.0~ N ~31~.20 E SO00- 3205 3089 37q1.~0 N ~51.~2 E 6000 ~202 ~086 ~361.2~ N 2802.05 E 7000 S].73 5057 ~030.6P N ~73~.~2 E 8000 6053 5~37 ~17~.57 N 2322.~6 E ~000 68~6 6730' ~73~.1~ N ~99.76 E lO000 76~6 7530 5332.29 N 2519.76 E 11000 8~ 12 82.~c6 5P~.08 N 2335.88 E A23-O1RD PERFORATION DETAIL SHEET PERFORATION INTERVAL MD TVD Zone 9878' '- 9899' 7548' - 7564' 10235' - 10251' 7827' - 7839' GR-GS 10261' - 10290' 7847' - 7870' GR-GS 10531' - 10572' 8058' - 8090' HC-HD 10593' - 10636' 8106' - 8139' HC-HD 10651' - 10682' 8150' - 8174' HE-HF 10783' - 10914' 8251' - 8349' HK-HN 10929' - 11072' 8360' - 8464' HN-HR 11096' - 11119' 8481' - 8498' HR-HZ 11121' - 11270' 8499' - 8607' HR-HZ Size & Number ~-I/8"'B.G'.~OSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-1/8" B.G.4JSPF 2-5/8"x2-1/8" H.C/B.G.4JSPF Please note' Reperforated 11121' - 11150' MD on December 24, 1987. Reperforated 11240' - 11260' MD on June 21, 1988. 2 5 6 7 COMPLETION EQUIPMENT DETAIL SHEET MG5 A23-OIRD e/z8/88 NO. ITEM APPROXIMATE TVD. MD. 1. 3 1/2" OTIS "X" NIPPLE 2. 3 1/2" OTIS "X" NIPPLE 3. BAKER SEAL ASSEMBLY w/ 11.85' Of SEALS 4. BAKER FB-1 PERMANENT PACKER 5. BAKER 9.34' SEALBORE EXT. 6. OTIS "XN" NIPPLE 304 304 7381 9667 7408 9700 7409 9701 7411 9704 7443 9746 7. BAKER WIRELINE RE-ENTRY GUIDE 7444 9748 CASING 13 3/8", 61#, J-55 @ 2393' w/1940 sx 9 5/8", 47#, N-80 @ 8080' w/1200 sx 7" 26#, N-80 0-9989' 32#, P-110 9989-11538' W/980 sx FLAG JOINTS AT 9904',10315',10621' PBTD = 11,440' (WL) TD = 11,550' TUBING 3 1/2" 9 3# N-80 8rd AB-Mod EUE @ 9748' PERFORATED ZONE ~_ , GN-GO GR-GS GR-GS HC-HD HC-HD HE-HF HI-HK HK-HN HN-HR HR-HZ HR-HZ GROSS INTERVAL 9878' - 9899' 10235' - 10251' 10261' - 10290' 10531' - 10572' 10593' - 10636' 10651' - 10682' NOT PERFORATED 10783' - 10914' 10929' - 11072' 11096' - 11119' 11121' - 11270' NOTE' 10,000# DN WT ON LOCATOR 90,000# UP WT 62,000# DN WT DATE 11/5/87 11/6/87 11/7/87 11/8/87 11/9/87 11/10/87 11/11/87 11/12/87 11/13/87 11/14/87 11/15/87 11/16/87 11/17/87 11/18/87 DAILY REPORT OF OPERATIONS A23-O1RD DESCRIPTION , ~ , N/D flowline. Change out 3-1/2" RAMS to 5" RAJ~,. N/U BOP. Test BOPE, blinds, pipe, choke manifold, standpipe, upper and lower kelly valves, floor valves, inside BOP to ;)50/3000 psi. Test Annular to 250/1500 psi. Rig down test equipment. Received verbal waiver for witness from Mike Hinder, AOGA. HU section mill and BHA. Make up Tri-state 9-5/8' section mill. RIH PU 5" drill pipe to 8155'. Mill window in casing F/8085' T/8110°. Ream and circulate from 8080' to 8110'. Circulate and clean hole. PU mill section. Mill window in casing F/8110' T8124'. Circulate. Mill. Circulate and condition. R/U HOWCO. Test HOWCO lines to 3000 psi, pump 100 bbls fresh water ahead, mix and pump 100 sx "G" cement + .5% CFR-2, mixwd at 16.7 ppg, followed by 36 bbls fresh water, displace with 101 bbls 11.2 ppg mud. Cement in place. Make up bottom hole assembly. RIH tag cement at 7993'. Drilled soft cement 7993'-B035'. Drilled hard cement 8035'-8085'. MU BHA for kickoff. SPUD 11/10/87. MU BHA. TIH to drill with mud motor to 8205'. Perform formation leak off test, 14.02 ppg. Drill to 8219'. Drill with mud motor 16'. POOH and lay down HWD. TIH to 8100'. Wash and Ream 135'. Drill 249'. Survey at 8367'. Drilling 42' Test BOPE. TIH to 8411' and ream to 8526'. Wireiine Survey. Drill to B572'. Drill 431'. Trip for new bit. TIH. TIH to 8910'. Ream 93'. Drill 392'. Repair rig. Repair rig (electric brake). POH F/New bit. Finish POH, change bit. TIH to 8080'. Circulate/cond mud. TIH 8722'. Circulate bottoms up. TIH TO 8941'. Wash/ream 454' to 9395°. Drill 26' to 9421°. DATE 11/19/87 11/20/87 11/21/87 11/22/87 11/23/87 11/24/87 11/25/87 11/26/87 11/27/87 11/28/87 11/29/87 11/30/87 12/01/87 12/02/87 12/03/87 DAILY REPORT OF OPERATIONS (continued) A23-OIRD DESCRIPTION Drill 21' to 9442'. Trip for new bit. Drill 184' to 9626'. Drill 14' to 9640'. Test BOPE. TIH and drill to 9806'. Drill 197' to 10003'. POOH and change bit. TIH to 8000'. Real ign rig. Drill 69' to 10072'. Change Kelly hose and test to 4500/f. Drill 48' to 10120'. Drill 224' to 10344'. Survey. POOH and change bit. TIH. TIH. Drill 315' to 10659'. Check flow and weight up to 11.6 ppg. Weighted up to 12.4 ppg. Survey. TIH with new bit. Ream to bottom. Drill 35' to 10694'. Drill 72' to 10766' Circulate/condition mud weight to 12.9 ppg. Drill 34; to 10800'. Check flow. Trip for new bit. Ream 48' at bottom. Drill hole 125' to 10925'. Survey. Test choke manifold valves, kill and choke line valves, standpipe val yes, mud pump valves, top and bottom kelly cock valves, pipe rams inside BOP valve, and floor valves at 250/4000 psi. Test annular preventer at 250/3500 psi. Test accumulator. Ream under gauge hole 30' to 10879'. Ream undergauge hole 76' to 10925'. Drill 120' to 11045'. Survey. Drill 15' to 11060' Drill hole 89' to 11149'. POOH. RIH to 11127'. Ream 22' to 11149'. Drill hole 46° to 11195°. Drill 54' to 11249'. Survey, check well. Change bit and TII~ to 11187'. Ream 62'. Drill 51' to 11300'. Drill 36' to 11336'. Change bit. Check fl ow. Repair generator. Drill 100' to 11436'. Drill hole 114' to 11550'. Circ. bottoms up. Survey. Circ. and Cond. for logs. POOH for logs. R/U and run wireline logs (DIL-GR). Run Density log. Circ. and cond. for logs. DATE 12/04/87 12/05/87 12/06/87 12/07/87 DAILY REPORT OF OPERATIONS (continued) A23-O1RD DESCRIPTION Circ and Cond. POOH for logs. Run RFT/GR. Stuck tool at 10610'. Circ. Fish. POOH with wireline. RI" to 10473' and wash 10473' - 10610_' RIH T/1~3,~2'. Circ. and condition mud. Wash over fish at 1151 POOH with overshot and fish. L/D fish and fishing tools. L/D monel collars, change BHA. Change BHA, RIH to casing shoe. Circulate and cond. mud. POOH. Lay down 5" Drill pipe and BHA. Change pipe rams to 7" casing rams. Test BOP to 3000 psi. Rig up to run 7" casing. Run 39 its 7" P-110 LT&C casing, run 253 its 7" N-80 LT&C Casing Shoe at 11538' Circ/cond. R/U cement head, rig up HOWCO cement iines, test lines to 5000 ps i, "G" · pump 100 bbls fresh water + .1% NaC1, mix and pump 980 sx + .2% CFR-2, + 5% HALAD 344, + 1% NaC1, + .125% LWL, mixed at 15 ppg, followed by 10 bbls water, displace with 428 bbls, did not bump plug. Cement in place. Rig down HOWCO lines. Nipple down BOP. 12/08/87 12/09/87 12/10/87 12/11/87 12/12/87 12/13/87 Make up test joint. Test BOP: Test annular to 3500 psi, test all valve and lines to 4000 psi. Change 7" casing rams to 3.5" pipe rams. Test rams and BOP to 4000 psi. Rig up to pick up 3.5" AB EUE 9.3~. tubing. RIH, pick up 3.5" 9.3~/ N-80 AB MOD tubing. Tag cement at 11109'. Circ. and cond. POOH. Rig up to pick up 3.5" drill pipe. M/U 5.875" bit. RIH pick up drill pipe to 11109'. Clean out cement to 11283'. Clean out cement to 11453'. Circ hole clean for CBL log. Test casing to 4000~ w/11.2 ppg. Change out mud with completion fluid. L/D 55 its of tubing. Rig up dialog. M/U, ran and set wireline re-entry guide XN nipple, Ijt tubing, Baker FB-1. Packer set at 9701'. Rig down dia-log. Finished TIH. Rig HOWCO to test tubing/seals/packer: Put 3000# on annulus, 5000# on tubing f/15 mins. Rig up sllckline, set PX plug/prong in XN nipple at 9720' (WLM) Lay down tubing lodging joint, put in drilling pipe ldg it. Put 3000~ on Annulus, 8000# on tubing f/15 rains. R/U and ran 30' dummy 2.5" OD perf. guns 10' out EOT. ND BOPE, NU/Test tree (Sk f/30 mins). Rig down. DATE · , , 12/22/87 12/23/87 12/24/87 3/16/88 5104188 6/21/88 7/27-29/88 DAILY REPORT OF OPERATIONS (continued) A23-O1RD DESCRIPTION ii i i i Perforated 11240' - 11270' with 2-5/8" Hollow Carrier 4 JSPF. Perforated 11121' -11240' with 2-1/8" Bar Kone 4JSPF. Reperforated 11121'-11150' with 2-1/8" Bar Kone 4JSPF. Acidized with 175 ball sealers spaced out in 1000 gal 10% HC1 followed by 1000 gal 12%/3%. HC1/HF and displaced with 1000 gal 10% HC1 do~ injection tubing. Rate increased from 350 to over 600 BWPD at 3500 psi. Coiled tubing acidized all perforations with 1000 gal 10% HC1 followed by 1000 gal 12%/3) HC1/HF and displaced with 1000 gal 10% HC1. Rate increased from 400-500 to over 600 BWPD at 3500 psi. Reperforated 11240'-11260'. No increase in injection rate. Perforated the following- 9878' - 9899' 10235' - 10251' 10261' - 10290' 10531' - 10572' 10593' - 10636' 10651' - 10682' 10783' - 10914' 10929' - 11072' 11096' - 11119' GN-GO GR-GS GR-GS HC-HD HC-HD HE-HF HK-HN HN-HR HR-HZ PREPARED FOR: Shell Westep~ Exp. I~c. 601 West ~th Ave. Ste. 810 99~01 TOXICITY TESTING OF' DRILLING FLUID FROM: A SAMPLE NUMBER: P~epa~ed bY: (504) 9a4-~610 DATE & TIME INITIATED 12/17/87(10:45 pm) DATE & TIME COMPLETED 12/21/87(10:45 pM) DATE OF REPORT: 122287 ABL CONTROL NO: 871216-3 4.0 5.0 1o~ 1.3 Mate~inls ~n~ Methods E~pepimental ~onditions ~esu It s 3 4 Appendix A 96-Hou~ survival of Mysi,,do~sis bahia exposed to the SPP. Hyd~oloBical parameters measured duping the 96--hou~ LC-50 definitive test with Mysidopsis (871~16-3) ~ !_NFORM.,i:ITION Sample 1. D. Numbe~ Well -RD Block - p]atforwn - Well - OCS-G #> Date of SamplinD: 1~/07/87 Time of SamplinD~ ~400 Depth of 8ample: rsot available Dates Analysis was Pe~..foY'wned: I~/17/87(10a45 pm) - 1~/~1/87(10~4~5 pm) Individual Who Perfopmed the Analysis: Lan Johnson Ana 1 yt i~al Methc`d Used UoS. Envirc`nmental Pfc`faction Agency Industrial Technolc, gy Divisio~ May~ 1985. Appendi~ 3 - Drilli~,g Fluids Toxicity Test Propc`sed Regulation for offshore subcategory of the c`il '~0~ No 165/Monda¥v August ~6v 1985 (40 CFR Part 435/34636) SUMMARY Mysid shri~np (~ysidop.sis bahi______~a) were e~posed to the suspended particulate phase ¢SPP) of the drilling fluid fro~ A 8A-~3-01 -RD. Nc, median effect (50~ mc,frailty) was observed for the fluid during the 96-hour test. I~ c`ther words~ at 100% (871216-3) 1o0 ,~,a%,mpials and lqeth~,s, 1. I ~ptificial ,~eawatep ~.~epapat l.~ Opqanism ~quisition and Maintenance Mysid shpimp (Hysido~sis bahia) wepe obtained fpom cultupes at the ABL Lab. Mysids wepe paised and maintained at +_~ degpees Celsius and ~0 +_~ ppt salinity. Mysids wepe fed The 96-houp LC-50 fop the Standapd Refepence Toxicantv (sodium laupyl sulfate) was 6.46~ ppmv with a 95~ confidence intepval of 8.473 ppm to 5.~61 ppm. This indicates that the · A 5 gallons sample of dpilling fluid fpom Shell Western Exp. Inc. ~ (A 8A-~-OI-~D) was collected on 1~/07/87 and delivered to ABL~ Inc., on De~embep 16~ 1987. 8ample sto~ed at 4 degrees ~ un, il tested. The dpilling fluid had ph of 8.5 and appeaped as a as a bpown easily mi~ed mud. The sample ~as thopoughly mixed by a lvOOO-ppm high-sheap mixep fop thipty (~0) minu~es ppiop to use. The suspended phase (SPP) was ppepaped by mi~ing ~he mud sample and The ph of the slu~¥ was measured and ad~us%ed, if necessary, The supernatant (BPP) warn decanted into an appropriate containe~ and mi~ed ~or another ~ive (5) ~inu~es. The ph and The suspended particulate phase of the drilling fluid contained not available ~nB/l fi l%epable residue and The range-finding test indicated that the concentrations for the 96-hour test should be between 3 and 100. The 1¢)0~ SPP was dil~ted ~ith the appropriate volumes of artificial sea~ate~ ~.0 Experimen%al Conditions ~PP tests were conducted at ~0 +_~o ppt and ~°0 +_~o deBrees polyethelene tubinB. The l iBht/d~pk ~y~le ~as ~aintained at squared ~ool ~hite fluorescent bulbs. The temperature of the 3.0 Experimental Nytex cups were used to confine the ~oysids in each test ~oncentpation. These cups were positioned in ~ liter culture dishes which contained I liter of the test solution. The five ~ccc, pding to a Inc, dif~ed pandomtzatton p~ocedu~e is described tn the EP~ 40 CFR Pa~ 435. 4°0 Results The numbep of opganisms supviving aftep 96-houps is used using EPA's Toxdat Multi-method ppogpams. Howevep~ no median effect (50'~ moptalit¥) was obsepved fop the · dpilling fluid duping the 96-houp test. In othep wopds, at IC)O?C concentpEtions of S~ mo~e ~h~n 50~ of ~he mysid shrimp supvived. The LC-50 value is gpe~tep than 1,00C)sC)C)C) papts pe~ ~nillion (ppm) s and as such ~annot be ~al~ulated. 5.0 Refepences Wastewatep. 15th Edition. U.S. Enviponmental Ppotection Agencys 19t~5. Industpial Technology Division of the Office of Watep~ EPA. Washington~ Appendix A 96-HDUR SURVIVAL OF ~y~idc,~mim bahia £XPDSED TD THE SPP Concen%ra%ior~ 0 96 Survival 0 Contrc, 1 60 56 93 ~ 60 54 90 10% 60 55 92 50% 60 51 05 (871~16-3) 3O, 0OO 142mm A ~3 pm',cu~) JJ C 6,8 7,3 7.3 7.3 7.3 L! 7.3 6.8 7.3 7.3 7,3 7.3 6,5 7,2 7,3 7,2 7.2 6,.5 7,2 7,3 7.2 7.2 6.5 7.2 7,3 7,2 7,2 LO LO LO LO LO C 5*8 6.9 6.9 7,0 6.9 5.8 6.9 L9 7,0 6,9 5.8 6.9 6.9 7,0 6.9 LO O.l 8.1 8,1 LO O.l ~.l O.l O.O O.l LI 8.1 &l C 4,6 6.6 ~7 6.6 6.6 4,6 6.6 6.7 6.6 6.6 4,6 6.6 6.7 6.6 6.6 &O &l &J &f &J C LO 6.2 6.3 6.2 6.1 T~mlx, rat~ of the ravioli c~ld~ ms L~ati~y rK~rded. During the 96-ho~ toxicity ao.o .., 2.0 ~. (0TI21&-3) GREAT LAND I]IRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAl_ SURVEY SHELL WESTERN E & P ~.~ 9 I~i R ;'"~ N Y MGS WELL COOK INLET AI-1187D26 MWD & SINGLE SHOT 12/7/87 .... I 0 [!', i,! t.J ?1E', Ii' I=,.; 'T Y I::' N (.t FI ~"' '1' I T I... [E S I G N A 'l' tJ R [il 8100 FT 11494 FT t')EF:'-f'H I .k! '!' t'iil:;:t....)~'.~-~t.. I.: R.['~I'I "f'[) 11-08-87 12-02-87 I') A"f' I:i: S U R V [!: Y' T A K E N I::'R (')I'q 'T' (] · · THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REgUEST. ALL SURVEYS ARE KEF'T IN A LOCKED FILE ANO ARE HELD IN STRICTEST CONFIDENCE. RECEIVED lEA1 LAND D!REC:TIONAL DRIL. L. ING,INC !ent .............. : SHELL WESTERN EXPLORATION & PROD. :11 ................ : MGS ~ A 23-011~D OSC,~'e Di~:e. ction...: N 20.00 E tqr~etJc DeclinotJon: 25 dec; 0 n, ln E ttrm f!le n~n,e ...... : B:A230:1D.DAT IP=evious INC. RECORD OF SURVEY su=ve¥'doto ComputotJon: Suz:vev dote: Method ..... : RKB Height.: to 8100.0l RADILIS OF CURVATURE 1:1/11/87 SINGLE SHAT & MWD 11,4.0 ft ~AS DRIFT TRI_IVERI' SUBSEA SECTION DIRECTION -P~" DG MN DEPTIt DEPI'H 13I SI' ANGLE --! ~100 37 3 6:133.20 d017.20 4757.57 N 23.00 E ~1.77 38 12 dl~.lfl 6078.1.8 480~.27 N 2~.00 E ]3d7 38 30 d3~3.1.? 8227.19 4920.89 N 28.00 E )~80 38 0 6~31.~3 6315.¢3 42~0.3~ N 25.00 E ~SO 3~ 30 680~.04 6~0.04 5274.16 N 12.00 E ~343 36 qS >P, 23 37 0 )2~2 40 0 )SBd 38 0 )860 42 1S )~1 44 O L ].~S 43 4S 1.4~,~' 42 1S 7].21.44 7005.44 5503.30 N 4.00 E 7505.42 7389.42 S774.&S N 3.00 W 7872.42 7756.42 6032.08 N 13.00 W 8100.fl~ 7~84.8~ ~180.71 N 20.00 W 8310.35 8]~4.35. &313.¢4 N 22.00 W 8405.~6 828~.~6 637~.~6 N 23.00 W BSS3.02 8437.02 ~481.~ N 25.00 W 8771.68 86SS.68 6622.01 N 28.00 W RELATIVE COORDINAI'ES FROM WELL-HEAD 4227.33 'N 4269. S6 N 4373.16 N 4435.76 N 4704.96 N 22¢S.70 E 2316.30 E 2372.55 E 2403.7& E 24~3.83 E 4~36.~S N 5224.7~ N 5513.51N 5690.79 N SBSS.~O N · 5~38.33 N ~0~7.q? N ~24~.~5 N 2526.44 E 2528.~'5 E 2488.37 E 2435.8& E 2372.S¢ E 2338.33 E 2280.82 E 218¢.85 E CLOSURE DIS1ANCE DG 4810.46 4flS7.4 O 4975.27 5045.20 5325.02 MN S N 28 30 17 E N 28 28 SO E N 28 28 SI E N 28 27 12 E N P7 SS 32 E SS4S. 84 S804.65 ~049.03 e~lgO. 17 6318.01 6382.12 6482.02 6622.49 N 27 6 2 E N 25 45' 42 E N 24 17 27 E N 23 10 21 E N 22 3 25 E N 21 29 35 E N20 3~ ~E N 19 lB 34 E DOG LEG deq./:100 0.000 0. 258 1.07.-© 1.02? 0. 732 0.53;1 1. 089 1. 130 1.586 1. 386 0.485 0. 676 23-01 ' 12./07/8~7 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH iAS. TRU VERT SUB SEA MD-TVD VERTICAL {PTPI DEiPTH DEPTH D I FF. CORRECT 8078 61:1.6 6000 1962 26 8205 6216 6 ]. 00 1989 27 8~' " 63].6 6200 20].6 27 8~ DO 6~ ~ 6 6300 20~ 28 8E, 86 6516 6~00 2070 26 8711 8837 8962 0087 92:1.2 9336 9461 9586 9711 9837 1.0,_,- 0 LO34B L0477 10606 10737 L08~8 11005 [ 1~144 ~128i '418 6616 6716 6816 6916 7016 7:1.16 7216 73:1.6 7416 7516 7616 77:1.6 7816 7916 B016 5116 8216 8316 8416 851.6 8716 6500 2095; 25 6600 2].21 26 6700 ,2146 25 6800 2].71 25 6900 2196 25 7000 222O 24 7].00 2245 25 7200 2270 25 7300 2295 25 7400 2321 26 7500 2348 27 7600 2376 28 7700 2404 25 7800 2432 28 7900 2461 29 8000 2490 29 8100 2521 3]. 8200 2552 31 8300 2589 37 8400 2628 39 8500 2665 37 8600 2702 37 RELATIVE COORDINATES FROM WELL-HEAD 4215.4]. N 2300.97 E 4284.62 N 2324.62 E 4354.].3 N 2362.39 E 4424.46 N 2398.42 E 4495.14 N 2429.63 E 4566.79 N 2456.17 E 4639.25 N 2478.08 E 4712.19 N 2495.35 E 4785.14 N 2508.85 E 4858_76 N 25;1.9.12 E 4932.90 N 2526.15 E S007.61 N 2530.31 E '.S082.55 N 2532.10 E S157.61 N 2531.50 E 5232.92 N 2528.S0 E 5310.45 N ~°~°°.20 E S389.01 N 2512.07 E S468.42 N 2498.03 E S548.39 N 2479.89 E S626.58 N 2457.65 E 5702.26 N 2431.67 E 5779.83 N 2402.48 E 58d0.42 N 2370.~4 E S947.22 N 2334.54 E &03S.22 N 229S.?0 E 6121.06 N 2255.35 E 6204.43 N 2213.68 E 12/07/87 ; ~ A ,°3-01 bAlA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH MEAS. TRU VERT SUB SEA DEPTH DEPI'H DEPTH RELATIVE COORDINATES FROM WELL-HEAD 1000 241 125 3736.3<5 N 3159.14 E 2000 7].6 600 4337.64 N 29~.55 E 3000 1401 ]285 428~.99 N 2351.53 E ~000 2250 2134 37~.0~ N 231~.20 E SO00 3205 308~ 3741.q0 N 2~51.~2 E dO00 4202 4086 4361.29 N 2802.05 E 7000 5173 5057 4030.69 N 2734.42 E 8000 ~053 5937 4174.57 N 2322.46 E 9000 ~846 6730' 4734.12 N 2499.76 E 10000 7~4~ 7530 5332.29 N 25].9.76 E 2335.88 E ~0 2600 325O 39OO T 52oo V VERTICAL SECTION SHELL WESTERN EXPLORATION G PROD. IN HGS # A 23-0t SECTION AT N 20.00 E TVD SCALE: I inch = i300 feet DEP SCALE: i inch = i300 feet DRAWN : t2/07/87 IWk~, Idmttftclttm 7t50 7800 6450 9i00 9750 tO400 ti050 ti700 ...... !BO0 2450 3tO0 3750 4400 5050 5700 6350 7000 7650 e300 Depar~.ure 8950 96O0 m T~ ~ HORIZONTAL VIEW SH~__L WESTERN EXPLORATION G PROD MGS # A 23-0t CLOSURE 6622 ft N 19.3 E DECLINATIO~ 25.00 deg E SCALE: i inch - 350 feet DRAWN: ~2107/87 6478 6300 6t2,,q 598O 5778 56OO 525O 5O78 458O 4378 42OO 402.q :~22~ t400 i , I I t t t I I I t I I I t ' I I t I t I ' t ' I · i I .............. ---t-~ - i "~ = =-: ~- ..... ' t I ! th"/5 t750 t925 2tO0 2275 2450 2625 2BO0 2975 3i50 3325 'w STERN LO ,mON A 23-0t CLOSURE: 6622 ft N 19.3 OECLINATIO~ 25.00 deg E SCALE: 1 inch- 350 feet DRAWN: i2/07/87 6475 63OO 6i25 596O 577ff 56OO 5'25O 5O75 4900 4,55O 4375 ~00 4O25 i~ i400 t5"/5 t750 i925 2i00 ~75 ~450 26?.5 ~600 2975 3i50 3325 Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 April 9, 1990 Alaska Oil & Gas Conservation Commission ATTN L. Grant, Librarian 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF DIRECTIONAL SURVEY FOR MIDDLE GROUND SHOAL WELL NO. A23-OIRD. Per a request by your Larry Grant, enclosed are two copies of the directional survey performed while drilling Middle Ground Shoal well no. A23-OIRD. If you have any questions or need further information, please contact S. B. Brown-Maunder at (907) 263-9613. Very Truly Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/af Enclosure 040990A GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY SHELL WESTERN E & P . MGS WELL # A 23-01 l.,llii: L.L. ?.! ~"~ Pi COOK INLET .... ,~, :..: .. ALl187D26 MWD & SINGLE SHOT 12/7/87 .... I [) E', N !.J M E; E' R "1' Y !::' Iii: S LJ R V Iii: Y ~) A T N/.~ FI ~:',._ "[' ]: 'T' I... [E ,..,c; ]: G N ~, T L IR. 8100 FT 11494 FT I;) EE F:' -I" H I N "i' t'i: F;~ ~.,..~ ~'~ L. !:: R. i:l PI 'i" [) 11-08-87 12-02-87 I:) A "f' Ii: S t.! R V E Y T A K E N F:'R [')PI T [] . · THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO OESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. I "ECEiVED APR 0 990 .Oil & Co, s. Commissio_ Anch~ra~ 3REAl' LAND DIRECTIONAL DRILLING,INC 12/0 Z:! !ent .............. : SHELL WESTERN EXPLORATION & PROD. INC. 4ell ................ : MGS 7/ A 23-01P..D _'.]osu~-e Diz~ectiom...: N 20.00 E ~l,_~qr, etic Declination: 25 deCl. 0 mln E Z;atr_~ f!le name ...... : B:A2301D.DAT RECORD OF SURVEY Compc, totion: RADIUS OF CURVATURE Suz:vev date: 11/11/87 Method ..... : SINGLE SHOT & MWD RKB Height.: 11~.0 ft IP~evtous su=vev'doto to 8100.01 ~EAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES }EPTH DG MN DEPTH DE!PTH DIST ANGLE FROM WELL-HEAD 8100 37 3 ~133.20 ~017.20 ~7~7.~7 N 23.00 E ~227.33'N 22¢~.70 E 8177 38 12 ~194.1B ~078.1B 4804.2~ N 2¢.00 E 42~¢.S~ N 231~.30 E 83¢7 38 30 ~343.1¢ 8227.1~ 4~20.B~ N 28.00 E 4373.1~ N 2372.SS E 8480 38 0 ~431.~3 ~315.~3 ~0.3~ N 25.00 E 4435.7~ N 2403.7~ E 8~S0 3& 30 &80~.04 8&¢0.04 S274.1~ N 12.00 E ~704.~ N 24~3.83 E ~343 3~ 4S 7].21.44 700S.44 SS03.30 N 4.00 E 4~3&.~S N 2S2~.44 E ~B23 37 0 7SOS.42 73B~.42 S774.~S N 3.00 W S224.7~ N 2S28.¢'S E 102~2 40 0 7872.42 77B~.42 ¢032.08 N 13.00 W 5513.51 N 2488.37 E lOSB6 38 0 8100.8~ 7984.8~ ~lBO.71 N 20.00 W S690.79 N 2435.8~ E IOB~O ~ IS B310.3S B1~4.3S. ~313.~4 N 22.00 W SBSS.~O N ~372.S~ E · 10~1 44 O 8405.~ 828~.~ ~37~.~8 N 23.00 W 5~3B.33 N 2338.33 E ll].PS 43 4S BSS3.02 B437.02 ~4Bl.~& N 2S.00 W ~0~7.47 N 2280.B2 E 114~4 42 IS 8771.~8 BdSS.~8 ~22.01 N 28.00 W ~24~.~S N 21B~.BS E CLOSURE DI SI'ANCE DG MN S 4B10.4~ N 28 30 17 E 48S7.40 N 28 28 SO E 4~7S.27 N 28 28 SI E 504S.20 N 28 27 12 E S32S.0~ N ~7 SS 3~ E SS4S.84 N 27 6 2 E S804.~S N 2S 45' 42 E ~04~.03 N 24 17 27 E ~1~0.17 N 23 10 21 E 6318.01 N 22 3 25 E &382.12 N 21 2~ 3S E &482.02 N 20 3& & E 6622.4~ N 1~ 18 34 E DOG LEG deg./100 O. 3. 333 0. 258 1.0~? 1. 029' 0.732 0.S3;1 1. 1. 130 1. SB6 1. 386 0.48S 0. 676 35 7~ A 23-01 ' 12/07/8'7 DATA INTERPOLATED FOR EVEN FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA ND-TVD ]EPI'FI DEPTH DEPTH DIFF. 8078 61].6 6000 1962 8205 6216 6].00 1989 8332 63].6 6200 20].6 84~0 64:1.6 6300 2044 8EiSd 65].6 6400 2070 87 il I 6616 6500 2095; 8837 6716 6600 2 :].21 8962 6816 6700 , 2:1.46 D087 6916 6800 2:].71 ~P2 ].2 70 :].6 6~ 00 2196 9336 7:1.16 7000 2220 9461 7216 7].00 2245 9586 7316 7200 2270 971]. 7416 7300 2295 9837 7516 7400 2321 9964 7616 7500 2348 10092 77:1.6 7600 2376 10220 7816 7700 2404 10348 7916 7800 2432 10477 8016 7900 2461 10606 81:1.6 8000 2490 I. 0737 8216 8100 2521 10868 8316 8200 2552 110 OS 8416 8300 2589 11144 851.6 8400 2628 11281 8616 8500 2665 1-1418 8716 8600 2702 VERTICAL CORRECT 26 27 27 28 26 25 26 25 25 25 24 25 25 25 26 27 28 28 28 29 29 31. 31 37 39 37 37 RELATIVE COORDINATES FRON WELL-HEAD 4215.41 N 2300.97 E 4284.62 N 2324.62 E 4354.1.3 N 2362.39 E 4424.46 N 2398.42 E 4495.14 N 2429.63 E 4566.79 N 2456.17 E 4639.25 N 2478.08 E 4712.19 N 2495.35 E 4785.14 N 2508.85 E 4858.76 N 2519.12 E 4932.90 N 2526.15 E S007.61N 2530.31E SOB2.SS N '. 2532.10 E 5157.61 N 2531.50 E 5232.92 N 2528.S0 E S310.45 N 2522.20 E S389.01 N 2512.07 E 5468.42 N 2498.03 E 5548.39 N 2479.89 E 5626.58 N 2457.65 E 5702.26 N 2431.67 E 5779.83 N 2402.48 E S860.42 N 2370.64 E 5947.22 N 2334.54 E 6035.22 N 229S.70 E 6121.06 N 2255.35 E 6204. 43 N -,_.°°13.68 E 23-01 DATA INTERPOLATED FOR EVEN 1.000 FEET OF MEASURED DEPTH 12/07/87 MEAS. TRU VERT SUB SEA DEPTH DEPI'H DEPTH RELAT]VE COORDINATES FROM WELL-HEAD 1000 241 125 373~.3~ N 3139.14 E 2000 716 600 4337.~4 N 29~.53 E 3000 1401 ].28S 4289.99 N 2331.S3 E 4000 2230 213q 3799.06 N 2316.20 E SO00 3205 3089 3741.40 N 2~31.~2 E ~000 4202 q08~ 4361.29 N 2802.05 E 7000 S173 5037 4030.~9 N 2734.q2 E 8000 ~033 S937 4174.57 N 2322.4~ E ~000 ~846 ~730' 4734.12 N 2499.75 E 10000 7~46 7330 S332.29 N 2319.7~ E 11000 8412 5944.08 N 2335.88 E _ t300~ t95a 2600 325O 39OO T 52oo , ,t VERTICAL SECTION -SHELL WESTERN EXPLORATION ~ PROD. IN MGS # A 23-0~ SECTION AT N 20.00 E TVD SCALE: i Inch = i300 feet DEr SCALE: 1 inch = i300 feet DRAt~N : ~2/07/B7 Ilarkm' Xdenttftcttto~ 'm ~) Tm DEPRT IliO0 6133 4758 tt494 ~ ~ 7L~O 7800 8450 OiO0 9750 tO400 ii700 ........ 1 ........ tBO0 2450 3tO0 3750 4400 5050 5700 6350 7000 7650 6300 8950 9600 Departure -'AT LAND DIRECTIONAL DRILLING, INC lent .............. : SHELL WESTERN EXPLORATION & PROD. INC. [] ................ : MOS tt A 23-011~D >~u~:e Dlz:ectton...: N 2)0.00 E ~nett¢ De¢ltnotior~: TS deq 0 mtn E ~.a file nome ...... : B:A2301D.DAT Computation: RADIUS OF CURVATURE Survey dote: 11/11/87 Method ..... : SINGLE SHOT & MWD RKB He~qht.: 116.0 ft RECORD OF SURVEY IP~evtous ~u~vev dotc to 8100.01 AS DRIFT TRUVERT SUBSEA SECTION =TH E~ ~IN DEPTH DEPTH D]ST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 100 37 3 6133.20 ~017.20 ~7S?.S? N 23.00 E ~227.33'N 22PS.70 E 177 38 12 61~.18 6078.18 ~80~.27 N 2~.00 E ~2~.5~ N 231~.30 E 367 38 30 63~3.1~ 6227.1~ ~20.87 N 28.00 E ~373.16 N 2372.55 E ~80 38 0 6~31.~3 631S.~3 ~0.3~ N 25.00 E ~3S.76 N 2~03.76 E ~S0 36 30 ~80&.0~ 6~P0.0q S2?~.I& N 12.00 E ~70~.~6 N 2~3.83 E 3~~,36 ~S 7121.~ 700S.~ S503.30 N ~.00 E ~93~.PS N 2S26.~ E B23~,~37 0 7SOS.~2 738P.~2 S??#.&S N 3.00 W 522h.7~ N 2S28.~S E 2~2 ~0 0 7872.42 ?75~.~2 ~03~.08 N 13.00' W SS13.S1N 2~88.37 E 586 38 0 8100.8~ 7~8~.8~ 6180.71 N 20.00 W S6F0.?~ N 2~35.86 E 8~0 ~ 1S 8310.3S 819~.3S. ~313.~ N 22.00 W SBSS.&0 N 2372.S~ E · 991 44 0 8~0S.96 8~89.9~ 6379.96 N 23.00 W S938.33 N 2338.33 E 1PS ~3 ~S 8SS3.0~ 8~37.0~ 6~81.66 N 2S.00 W 6067.~9 N 2280.82 E ~ ~2 iS 8771.68 86SS.68 66~2.01 N ~8.00 W ~2~9.9S N 2189.8S E CLOSURE DISTA~2E ~3 MN S 4810.4& N 28 30 17 E ~8S7.40 N 28 28 SO E ~97S.29 N 28 28 S1 E S04S.~0 N 28 27 1.~ E S3PS.0P N 27 SS 32 E SS4S.8~ N 27 6 2 E S80~.65 N TS 49 ~2 E 80~9.03 N 2~ 17 2~7 E ~1~0.1~ N 23 10 ~1 E ~318.01 N 22 3 TS E 6382.12 N 21 29 3S E 6482.02 N 20 36 6 E 6622.~9 N 19 18 3~ E ~ LE6 0.000 3.332 o 1.0.~. 0.732 0.531 .oe? 1.58~ 1. 386 0. ~SS . 23-01 INTERPOLATED FOR EVEN 100 FEET OF SLIBSEA DEPTH ~S. TRU VERT SUB SEA ND-TVD VERTICAL ~l'hl DEPTH DEPTH DIFF. CORRECT B078 6116 6000 1962 8205 6216 6100 1989 8332 631.6 6200 2018 8460 64 ].~ ~300 ~044 87 11 6616 6500 2095 8837 6716 6600 21.21 8?62 6816 6700 ,2 ].46 9087 6916 6;800 2].71 92 ].2 70 ].6 6900 2196 9336 71.16 7000 2220 9461 7216 7100 2245 9586 73 ].6 7200 2270 971]. 7416 7300 2295 .';'837 7516 74 00 2321 ~.g64 7616 7500 2348 I 007~ 77 16 7600 2376 1.0220 7816 7700 2404 10348 7918 7800 2432 10477 8016 7900 2461 10606 8116 8000 2490 10737 8216 8100 2521 10868 8316 8200 2552 11005 8416 8300 2589 11144 85].6 8400 2628 11281 8616 850 0 2665 11418 8716 8800 2702 26 27 27 28 26 25 26 25 25 2S 24 25 25 25 26 27 28 28 29 29 31 31 37 39 37 37 RELATIVE COORDINATES FROM WELL-HEAD 4215.41 N 2300.~7 E 4284.62 N 2324.62 E 4354.13 N 2362.39 E 4424.46 N 2398.42 E 449S.14 N 2429.63 E 4566.79 N 2456.17 E 4639.25 N 2478.08 E 4712.19 N 2495.35 E 478S. 14 N 2508.85 E 4858.76 N 2519.12 E 4c232.c.:20 N 2526.15 E 5007.61 N 2530.31 E S082.SS N '. 2S32.10 E S157.61 N 2531.S0 E 5232.92 N 2528.50 E S310.45 N 2522.20 E S389.01 N 2512.07 E 5468.42 N 2498.03 E 5548.39 N 2479.89 E 5626.58 N 2457.65 E 5702.26 N 2431.67 E 5779.83 N 2402.48 E 5860.42 N 2370.64 E 5947.22 N 2334.54 E 6035.22 N 2295.70 E 6121,06 N 6204.43 N 2255.35 E 2213.68 E tt A 23-01 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH RELATIVE COORDINATES FROM WELL-HEAD 1000 2hl 125 3736.36 N 3159.1~ E 2000 71.6 600 ~337.6~ N 2966.55 E 3000 1~01 1285 ~289.99 N 2351.53 E ~000 2250 213~ 3799.06 N 2316.20 E S000 3205 3089 37~1.~0 N 2651.6E E 6000 h202 ~086 ~361.2~ N 2802.05 E 7000 S173 SOS7 ~030.6~ N 273~.h2 E 8000 6053 S937 ~17~.57 N 2322.~6 E ~000 68~6 6730' ~73~.12 N 2~99.76 E 10000' 76h6 7530 5332.29 N 2519.76 E 11000 5~.08 N 2335.88 E 23-01 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH MEAS. TRU VERT SUB SEA DEPTH DEpIlH DEPTH RELATIVE COORDINATES FROM WELL-HEAD 1000 2~1 12S 3736.36 N 31S9.1~ E 2000 7].6 600 ~337.6~ N 2966.S5 E 3000 1~01 1285 ~28~.9~ N 23S1.S3 E ~000 22S0 213~ 3799.06 N 2316.20 E SO00 320S 3089 37~1.~0 N 26S1.62 E 6000 ~202 ~086 ~361.29 N 2802.0S E 7000 S].73 S057 ~030.69 N 273~.~2 E 8000 6053 S937 ~17~.57 N 2322.46 E 9000 68~6 6730' 4734.12 N 2499.76 E 10000 7E~ 7S30 S332.29 N 2517.7t E 11000 8412 82~6 2335.88 E ALASKA OIL AND GAS CONSERVATION COkI4ISSION MECHANICAL INYEGRITY TEST ............ PkETE~ *P *I TYPE OF PKR CASING TBG REQ WElL *S --- ANNULUS IS;D SIZE/WY/GRADE SIZE TEST CSG TBG TBG IT~ C~'S *H *N FLUID ~D PRESS PRESS CSO CSO CSG PRESS PRESS PRESS - ~.~, ~.o 1~ ~ . ..... ' ~..~ . . .............. : = .... ,,,,, ,, , , ,,, ,, _ .......... , , ,Ill I ' I ~I Il Il ' , I I I l -- II I i I II II II i I III I I ~ ...... ~ , --. ,. ,, , , , - _ ~: - _ _ *I1JBING INJECTION FLUID: P = PRODUCE WA1ER INJ S = SALT WATER INJ M ,, MISCIBLE INJE~ON I - INJECTING N - NOT INJE~ A~O~ FLUID: DIESEL GLYCOL SALT WATER DRH LING [~JD UIIIER OTtIER AOGCC WITNESS SIGNATURE  20 MC~5.412(c) 20 ~C 25.252(d) SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON. TEXAS 77001 May 12, 1988 Shell Western E&P, Inc. 601W. 5th Avenue, Suite 810 Anchorage, AK 99501 A~ention: Joe Fram PLEA, BE REPLY 1'O KHLUMBERGKR OF~HORE IERVICE8 P. O. Box 1001 Kenat, AK 99611 Attention: Shelley Ramsey Gentlemen: Enclosed are 1 BLprintsofthe Company Shell Western E&P, Inc. Field. . Middle Ground Shoal Production Log ,Well Middle Ground Shoal "A" #23-O1 RD , ,County. Kenai State Alaska . Additional prints are being sent to: 1 BL prints Shell Western E&P, Inc. P. O. Box 527 Houston~ TX 77001 Attn: Lom Files, WCK 4147 I ~L prints, 1RF Sepia w/State of Alaska Alaska 0il & Gas Conservation Cormnimsion 3001 Porcupine Drive Anchorage~ AK 99501 Attn: $ohn Boyle 1BL prints Shell Western E&P, Inc. P. O. Box 527 Houston~ TX 77001 Attn: C. C. Williams, WCK 1134 1BL prints Shell Western E&P= Inc.. Platform HCO1 Box 485 K~n~t; AK q~611 prints prints PLEASE SIGN AND RETURN ONE COPY OF THIS TRANSMITTAL. prints prints The film is...returned to Shell- Houston Log Files. REi We appreciate the pr~ivilege of serving you. Very truly yours, SCHLUMBERGER OFFSHORE SERVICES Marc A. Gunther DISTRICT MANAO[R RETAIN THIS SECTION FOR YOUR RECORDS Nuclear F]o]og 1 PRINTS NEG. 1 SEPIA PRINTS NEG. SEPIA PRINTS NEG. SEPIA PRINTS NEG. SEI~IA PRINTS NEG. SEi~IA ~ PRINTS NEG.. SEI:JlA ~ PRl~'l"l~ . . SEPIA ABOVE RECEIVED FROM: DRES,S-~ ~ A',",'..',',o,'. ..... A~aska 0il & Gas Cons. C0rmlllss~ol~ SIGNED D,~'~orage 19 SHELL-HOUSTON, TX ARCO-A~,NCH, AK STATE OF AK-ANCH, AK I 2/09/88 NO. 001405 SCHLUMBERGER OFFSHORE SERVICES 500 W. INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA 99502 'COMPANY : STATE Of ALASKA X ALASKA OIL & GAS CONSERVATION COMMISSI-ON---- LOCATION : 3001 PORCUPINE DR. ATTENTION: JOHN BOYLE WELL NAME SERVICES COMPUTING CENTER PRINT CENTER WELL NAME · :l OH LIS TAPE SERVICES : 1 RFT COPY TAPE NO. OF BOXES:ONE 72540 JOB NO. : ADD'L TAPES :*SEE ABOVE NO. OF BOXES: JOB NO. : ADD'L TAPES : WELL NAME : SERVICES : WELL NAME : SERVICES : NO. OF BOXES: JOB NO. : ADD'L TAPES : NO. OF BOXES: JOB NO. : ADD'L TAPES : WELL NAME : SERVICES : WELL NAME : SERVICES : NO. OF BOXES: NO. OF BOXES: JOB NO. : ADD'L TAPES : SCHLUMBERGER COURIER JOB NO. ADD'L TAPES DATE DELIVERED 'TIME ~ 24 HOUR SAME DAY -' .~- [] P/U BY3PM CASE NO. --_ COURT .... DOCUMENTS:_ ~-~ ~ ONE HOUR $ SAME DAY $ 24 HOUR $ OTHER $ TOTAL $ :- ". [] ONE HOUR A,chorage : DATE' / /' SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON. TEXAS 77001 January 4, 1988 Shell Western E&P, Inc. P.O. Box 527 Houston, TX 77001 Attention' Log Files, WCK 4147 PLEASE REPLY TO 500 W. International ASrport ~nchorage, ^K 99518 ATTN ' Print Room Gedtlemen: Enclosed are] BLprintsofthe2'' & 5" DIL,LDT;RFT Compa~ny Sh.e]]__We.stern E&P, I nc., Field f-'-'~'~i~d~:~]t-:'~'~i!G'i~!~i'~i!~I :sI~IO~I'~]7 Count; ' ~ n-~'i ' ' ' State Alaska on: Additional prints are being sent to: 1 BL prints Shell Western E&P, Inc. 601 W. Fifth Ave., Suite 810 Anchorage, AK 99501 ATTN: Joe Fram 3 BL prints Shell Western E&P, Inc. P.O. Box 527 Houston, TX 77001 ATTN' C. Williams 1 RFolded Sepia 1 B L n~h-rrs- ~ AR¢O~'A 1 as k a, I_nc¢ ...... /P,O. Box 100360 AT0-1'3'76 · ",~Anchorage, AK 99501 )ti.IN'- D.S. Joi 1 RFolded Sepia 1 BL prints State of AK AK Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 ATTN: John Boyle 1 BL prints She! 1 P! atform "A" or "C" c/o Shell Kenai Office North Star Route #1 P.O. Box 485 Wik Road Kenai, AK 99611 __prints prints prints Rd. The film is returned to Shell (Houston-Log Fi les) We appreciate the privilege of serving you. Received Very truly yours, SCHLUMBERGER OFFSHORE SERVICES $O$--1565-A Marc Gunther DISTRICT MANAGER RETAIN THIS SECTION FOR YOUR RECORDS . I' RE (SHELL LOG) ACBL/V/S 1 PRINTS 0 NEG. 1 ,/J~) ,~,~ ~ J.[/~ ~'~ ,, PRINTS NEG. ~ ~/ "'~,~_~L~,..'//~)-,,__~RINTS NEG. .....-/ ,... __ PRINTS NEG. -- /uaska 0il & Gas Cons. Commiss[,?,~ PRINTS NEG. Anchorage PRINTS NEG. ~.ow .~c.~wo ..OM.' DRESSER ATLAS JOHN BOYLE ~'~TTENTION SEPIA SEPIA SEPIA SEPIA __ SEPIA __ SEPIA SEPIA SEPIA SIGNED DATF Shell Western E&P, P.O. Box 527 SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON, TEXAS 77001 PLEASE REPLY TO January 4, 1 988 S=.LU..E.GER O..S.O.E.E.V,CES 500 W. International Airport Anchorage, AK 99518 Inc. ATTN: Print Room Houston, TX 77001 Attention'_Log Files, WCK 41 47 Geritlemen: x.,~ ~ -.,~ '-..~ ~ Enclosed are] BLprintsofthe.2'' & 5"D-IL,LDT;RFT Company She11 Western E&P, Inc., Well A-23-01 RD Field MJ ddle Ground Shoal , County Kenai State A 1 a s k a on: Additional prints are being sent to: 1 BL prints She1 1 Western E&P, I nc. '601 W. Fifth Ave., Suite 810 Anchorage, AK 99501 ATTN: Joe Fram 3 BL prints Shell Western E&P, Inc. P.O. Box 527 Houston, TX 77001 ATTN- C. Williams 1 RFolded Sepia 1 BL prints ARCO Alaska, Inc. P~ O. Box 100360 AT0-1376 Anchorage, AK 99501 ATTN:. D.S. Joiner RFolded Sepia ate of ~ArK ..... '~ Oil &-fGas Conservation Chin. mission 3001 PorcuDi'ne Dr ~ choraae,' AK 99~01 ? 1 BL prints Shel! Platform "A" or "C" c/o Shell Kenai Office North Star Route #1 P.O. Box 485 Wi k Road Kenai, AK 99611 __prints prints prints Rd. The film is returned to Shel 1 (Houston-Log Fi les) We appreciate the privilege of serving you. SOS--1565 -A Very truly yours, SCHLUMBERGER OFFSHORE SERVICES Marc Gunther DISTRICT MANAGER TELEX / Fq'K)NE .; : 1588052t~' DESTINATION STATK~ lie II II II II II II II II II Iii TO (CON.~GNEE) F,L. EAS[ US~ FUU.. AOOflESS,, NO P.O. BOX AGUATIC IIIIMBB~Y I. JU3 ll4l ~Nnr.',a~Li.L iPRimcm mm M4'I'CII IIOUI,~ IJ% lel14 SHIPPER'S SI6NATURE METHOD OF I'"] ~.C~.N? PAYMENT ~u.s ~s~. c:~..Y) 8ATUROAY SERVCE CONSIGNEE'S SIGNATURE INSUR 6HACL mE kMTED 10 U.~ $~0000. ~SUP, ANCE COV~U,~ ~S *'UUCASCE ~ { · ~) EP-1034 (Rev. 10-80) O ~SHELL OIL COMPANY BLOW OUT PREVENTER ASSEMBLY PRESSURE TEST ' B. KELLY COCK PRESSURE TEST Co OTHER PRESSURE TESTS D. CAS I NG PRESSURE TEST REC'EIV.ED DRILLING AND WELL SERVICING BOP, ACCUMULATOR:& CHOKE MANIFOLD TEST ~EPORT Alaska 0il & Gas Cons. Commission (Inserts ~n-'Reverse) . ~RIG . IBLOCK/FIELD ILCE &~WELL NUMBER ~ I~ERATION ' / I PRESSURE I ~ O D PRES~ 9~~ va ves on choke ' UNIT APPLIED T ME H~~oFF SCREWS' [ ~f0~- as~ as a stop? ' ~ 1~ ~:- --- j~ ~ ~ [ - ~ ' J are employed used as a stop? ~o Did valves operate easily? UPPER LOWER Left in open position? [] No lOP JOINT OF CASING j~ Weig. h t ,,,. Grade Eo CHOKE MANIFOLD PRESSURE TEST ACCUMULATOR & BOP CONTROL ', MANIFOLD - Safety Valve Inside Preventer ¢~_ Std. Pipe, Swive~ Rotary Hose, LAST STRINGcsG J Pressure on casing/casing annulus By = Psi BY = Psi CLASS __ TEST PRESSURE VALVES TESTED VALVE POSITION MARKERS cS-D~~ .~,~ ~;s [] ~o .s~ ~ ~ ~o VALVE OPERATORS TESTED ACCUMULATOR TESTED AS: REMOTE CON, 5TA, TESTED BOLTS ON MANIFOLD LAST. / IN"F" ~ AS IN"G"~ ITIGHTENg~(D~)~ ~es~ ~o ~ ~ ~o j ~ ~ No /~~~ _ HYDRAULIC CHOKE CHECKED AIR PRESSMRE AT CHOKE-... IGAUGES A% CHOKE CHECKED AUXILIARY CHOKE POWER ' -- HYDRAULIC PUMPS / ]FUUID OPERATING PRESSURE }A~R INL~T~RES~RE . ~OPERAT~NG ~UU~D . ]LOW PRESSURE~ ~NO. OF STATIONS ~BUND RAM CONT~G~RD ON ~BLADDER OR F~AT .... ' ~ UNIT LAST CHECKED BY ICONTROLS LABELLED CURRENTLY? I ~ E}No Last Checked S. NUMBER STATIONS JPOWER SUPPLY JLOGATION JLABELLED CURRENTLY IBLIND RAM CONTROL REMOTE / ' ~ ~o ~ ~o CONTROL L E TESTED J PR~SURE ON ~E - / J F~'ID IN SYSTEM JPLATFORM SHUTDOWN ON I Accumulator & Pump Accumulator Only ~ Pump Only ACCUMULATOR H. ' Time ACCUMULATOR Pressure ~ Pressure PERFORMANCE' I Time t Time / /INITIA~I FINAL INITIAL I FINAL · Blind Rams J ~~/~ J/~ ~ /~ J~ EQUIPMENT Circulating head on floor , Flowline momtor installed & ~kin CHECK Inside MOP's on floor Fill uP L~ne & Kill Line Pit level indicator installed & ~k~ng Pump stroke counter Trip Tank j · WHERE LEAK OCCURRED IHOW REPAIRED ' / ' ' ' ( ~OV~TOg/whitecopy RIG-~kcopy - RECHARGE TIME Pressure INITIAL FINAL .~et /lj~ secs. .gao Reaction t}me Four-way valve locks Wear Bushing JDATE/~--~ September 16, 1987 Mr. M. L. Woodson Division Operations Manager Shell Western E&P Inc. 601 W. Fifth Avenue, Suite 810 Anchorage, Alaska 99501-2257 Re: Telecopy: (907) 276-7542 Middle GroUnd Shoal A 23-01 RD Shell Western E&P Inc. Permit No. 87-93 Sur. Loc. 1627'N,435'W of SE cr Sec.ll, T8N, R13W, SM. Btmhole Loc. 2404'FSL, 1827'FWL of'SW cr Sec. 1, T8N, R13W, SM. Dear Mr. Woodson: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very truly yours, ~om~±s ~ ±oner off ~aska 0~ and Gas Conservation Co~s~on BY ORDER OF THE COMMISSION dlf Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Bill H. Lamoreaux Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 September 14, 1987 Mike Minder Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: THE APPLICATION FOR PERMIT TO REDRILL MIDDLE GROUND SHOAL WELL NO. A 23-01 Dear Mr. Minder: In a recent telephone conversation between M. Minder, of your staff, and S. Brown, of our staff, the APD for the A 23-01 redrill was discussed. Apparently, there are a few items in our drilling program that need clarification. This is provided below: 1) Drilling Fluids program - The program consists of using salt water dispersed lignosulfonate mud (1% NaC1). The recommended properties are as follows: Weight - 9.3 to 11.0+ kill mw from P&A ppg Salinity - 1% NaC1 Funnel Viscosity - 40 to 45 sec./qt. REC~IVJiV Plastic viscosity- 15 to 20 cp. Yield Point - 10 to 20 lb./lO0 sq. ft. API Fluid Loss- lOcc HTHP FL at 150° - <20cc;10cc by HC Naska 0ii & Gas Cons. CommissiorpH' 9.5 to 10.5 Anchorage M BT- 15 - 2 5 2) The Drilling Fluid Surface System - A schematic of the mud solids control system is enclosed. Additionally, all drilling fluid equipment and operating practices will comply with 20 AAC 25.033. 3) The BOP size - We intend to use a 5000 psi BOP stack as recom- mended by section 4.55 of the SHELL "Safe Practices for Drilling and Well Servicing Operations" Manual. We will test the BOP to 5000 ps i. 4) The proximity of other wells - From the kick off point at 8100' we intend to diverge from the original well bore such that we are at least 150' from the original well bore by the top of the Mike Minder September 14, 1987 Page 2 producing interval (HC). No other wells are within 250' (clos- est well is 1320') of the proposed redrill path. 5) Hydrogen Sulfide - We intend to comply with 20 AAC 25.065. If you have further need to discuss these items, please contact Susan Brown at (907) 263-9613 or Ed Unger at (907) 263-9634. Very truly yours, ~. k. ~oodson Division Operations Manager SBBF/A2301 Shell Westem E&P Inc. Q 601 West Fifth Avenue * Suite 810 Anchorage, Alaska 99501 September 2, 1987 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 SUBJECT: MIDDLE GROUND SHOAL WELL NUMBER A23-01 Gentlemen- On September 2, 1987 Blair Wondzell and Susan Brown discussed the redrill operation that SWEPI is planning for well number A23-01. Per the September 2, 1987 conversation between B. Wondzell (your office) and S. Brown (our office), the Application for Sundry Approval to abandon and the Application for Permit to Redrill the lower section, of A23-01 is enclosed. The work is scheduled to begin around September 10, 1987. If you have any questions, please contact Susan Brown at (907) 263-9613. Very truly yours, W. F. Simpson Manager Regulatory Affairs Alaska Division SBB/kka SEP o --~ i~,~ / Alaska Oil & Gas Cons. Commission Anchorage SBBF/aogcc. O2a STATE OF ALASKA %-- ALASKA IL AND GAS CONSERVATION L MMISSION PERMIT TO DRILL 20 AAC 25.005 I~, .~° la. Type of work Drill [] Redrill lb. Type of weJl. Exploratory [] Stratigraphic Test I~ Development Re-Entry [] Deepen Service~;, Developement Gas [] Single'Zone r-I Multiple Zone []" 2. Name of Operator Ch,~,~'~t' ?¢~,' ,,,¢',,~O~,/" 5. Datum Elevation (DF or KB) 10. Field and Pool Shell Western E&P Inc. ~.//~/,~. ' /'~,~,~,~1t/ ll6'DF . feet Middle Ground Shoal 3. Address/' 6. Property Designation 601 West Fifth Ave., Suite 810, Anchorage, AK 99501 ADL 18754 "A" Pool 4. Location of well at surface Platform "A", Leg 4, Con- 7. Unit or property Name 11. Type Bond (see 20 ^^c 25.025) ductor 28. 63.45'S & 56.79'E from Leg 1 @ 1627'N & 435'W Middle Ground Shoal of SE corner of Sec.11,T8N, R13W,SN 2047At'FwLPtO of productive interva@ 7869'TVD, 1804'FSL & 8. Well nurpber,,,,.,,4,,,~ ] ] Number Statewide INA 0084 of SW corner of Sec. 1, TSN, R13W, SM A23-01¢_'3) ....... 116136503 At total depth e 9021' TVD, 2404'FSL 9. Approximate spud date Amount $500,000 & 1827' FWL of SW corner of Sec. 1, T8N, R13W, SM September 10, 1987 $100,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and tVD) property line 2876' to "N" leaselinefeet @ closest point 250' feet 3746 11~586'..& 9021' feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) @ 8866' Kickoff depth 8110 feet Maximum hole angle52.5° Maximum surface 1700 psig At total depth (TVD) 5062 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) . 17-1/2" 13-3/8" 61 J-55 BTC 2393' 0 O 2~9~' ~,OR' ~,-,~,~,, ~,, 12-1/4" 9-5/8" 47 N-80 BTC 8100' 0 0 8100' 6133' alr~.~dv ~n A WINDOW WILL' BE MILLED FROM 810(i' to 81.~0'. 8-1/2" 7" 23&26 N-80 LTC 3886' 7700' 5836' 11586, 9021, 1400 sx of "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical 11,202 ' feet Effective depth: measured 7,885' feet Junk (measured) (After setting bridge plug and true vertical feet laying cement) Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface 2393' 13-3/8", 61#, J-55, BTC 1940 sx 2393' ~ ~ C ~1VED Intermediate Production 8565' 9-5/8", 47#, N-80, BTC 1200 sx 8565' '-('~i~'i7'~ i"~ :' Liner 2860' 7" 29#, N-80, , 470 sx 8171'-11031' (Abandoned) '" Perforation depth: measured A~aska 0il & Gas Cons. true vertical 10,118'-11,000' 7 intervals (Abandoned) Anchorage 20. Attachments Filing fee ~ Property plat [] BOP Sketch J~ Diverter Sketch [-3 Drilling program Drilling fluid program_[],,,-T-~me vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements 2,.1....J hereby certify ~"~1'~ forego. Lqg is true and correct to the best of my knowledge Signed ~//' Title D,v, sion Operations Manager Date 9/2/87 Commission Use Only Permit Number I APl number I Approval date I See cover letter ,~,~-~ ~ ?';; 50-- '?.~ :...'-. :%,;~ ;~. ~ ;~-- ~: I 09 / ]. 6 / 8 7 for other requirements Conditions of approval Samples required I~ Yes ~ No Mud Icg required L-] Yes ~_~ No Hydrogen sulfide measures [] Yes [] No Directi6nal survey required "~i, Yes [] No BOPE/E~2M; J~'3M; '~ by order of Approved by ~~ Commissioner the commission Date ,~- ,/~ DRILLING PROGNOSIS MIDDLE GROUND SHOAL A 23-01REDRILL PRESENT STATUS' The well has been killed, the 9-5/8" casing repaired, all tubing and packers removed, cement placed across the Hemlock, a bridge plug set, a 50' window milled, and kick off plug set. While drilling the 8100' to 11,586' interval, use salt water dispersed, lignosulfonate, 9.3 ppg, mud with 1% NaC1. 1. Pick up an 8-1/2" bit and drill out cement to 8110'. POOH. e Pick up high torque, low speed mud motor and kick off plug (high and/or to the right) at 8110'. e i Drill an 8-1/2" hole to 11,586' (180' below HZ marker). Run desired wireline logs. If the 9-5/8" casing is to be reused, run a casing caliper log to ensure its integrity. 5. Run 7", 23 and 26#, N-80, LTC casing (or liner) to TD. e Clean out and test casing to 4000 psi (or liner as per liner prognosis). 7. Proceed with cased hole completion prognosis. VEU6/O902a ~'"' ~-qWEPI INTEREST' 66.67% ALASKA DIVISION DRILLING PROGNOSIS 8/19/87 WELL' A-23-01 REDRILL (mill out of 9-5/8" casing) LOCATION: PLATFORM "A", LEG 4, CONDUCTOR 32 OBJECTIVE: HR HZ EVALUATION GEOLOGY AFE NO' FIELD: MGS EST. ELEVATION' 116' DRILLING ELEC. MUD SIGNIFICANT CORES SURVEYS LOGGER FORMATIONS REUSED FROM A-23-01 UJ 0 _J o z 325'-- 2208L TOP , NEW LINER 5836- TOP Of 6133~ WINDOW BOT OF 6173L WINDOW TOP 6190~ OLD LINER FG 6250'- 9-5/8" SHOE 6505% FL 6546' FS 6823~ GB 7193g G D 7314L GN 7576L GR 7896L HC 8181~ HE 8297~ HI 8352L HK 8417L HN 8553L HR 8702L HZ 8866~ LINER SHOE 9021L WELL DEPTH TVD MD _325',,,~ -2393 ~700' -8100' -8150' -8171' -8247' -8565' -8617' -8960' 9413' L9560' '9877' -10261' LLO6O1' -10738' -lO8O3' -10880' 41040' -11214' -11406'. -11586' CASING AND CEMENT HOLE DEV. HOLE AND DIR. MUD SIZE CONTROL PROGRAM REUSED FROM A-23-01 MGS PLATFORM A ............. l - A23-01 ...... EXISTING WELL & PROPOSED · . . : . . ~ ' , ~ · , I , . ~ ..... J . i ....... VSEC AZ=340.0,,.I ......... ;, REDRILL'. . , . " PLAN VIEW .SCALE' 1'=500' · . SCALE' 1'=1000' ' ~T D ............. ! i i 8/17/87 ATTACHMENT The maximum pressure gradient is expected to be .571 psi/ft. Maximum BHP is expected to be .571 x 8866 = 5062 psi. Maximum surface pressure is expected to be 1619 psi, assuming a full column of .360 psi/ft, oil. The well will be drilled in compliance with the Alaska Oil & Gas Conser- vation Commission's regulations issued April 2, 1986 No diverter system will be used. During the entire redrill, the BOP stack will be nippled up (see attached drawing). VEU6/0828 MGS A-23-01 REDRI~ 8 1/2' HOLE 5000 PSI bFACK lOP OF KELLY BUSHING 1.40't mlll',O.P OF fJERRICK"~'LOOR ........ I I iii ii i mi i mi i i i i ii i m I II I BOTIOM OF OIARY BEAM r" DRILL ~ NIPPLE FLOW LINE o FILL UP LINE ANf,~UL AR 13-5/8' 5000 PSI FLANGE . - .. ~/,//~'///i ' '--~ . ~ooo ~ MAIN DECK ~ ....... E~' 13-5/8' 5000 PS! FLANGE ~L~ 11' 5000 PSI DSA ...... ~ I1' 5000 PSI FLANGE i O 13-5/8' 3000 PSI X 11' 5000 PS! WFSPOOL WELLHEAD ROOM FLOOR iii ii ii H m~ III II ! m I I mi iim · 8/19/87 13'3/8" SOW X 13-5/B" 3000 PSI 'WF' HOUSING ~,,'r (: NOTE: DIMENSIONS INCLUDE 1/2" GAP BETWEEN FLANGES ........ SHELL MINIMUM BOP ........... $?ACK REOUIREMENTS Min. Min. No. Item I.D. Nomifml · 2 Fill up Line 2" 3 Drilling Nipple 4 Annular Preventer 5 Two tingle 0, One du~l ~ydrU"li~"tl¥ ...... operlted rims --6-'~9 spool With 2" and"3" rain: .......... outlets 7 Gate Valve 3 1/8" '8 Gate ¥"aive'power Omrated" 3.1/8"' .......... 9 Line to choke minifol'd 3,~ 10 Gate V~lve 12. I/16" i i Check Veive - 2.1/i6" ? 3 c.,!.gS oo _, ,' ...... ' ...... ,, '14 Valv~ Gate 1-13/16" 15 Compound Pre"ur, Gmu~e'~.°n'ne~:tm _16_ Control .plug or..vetve .. 1-13/16" 1 ? Kill line to_rig..m, ud.PUmp mini f0id' . ....... 18 2" X 2" X 2"cross ~ , 'NOTI: Additlonll .34clflcetlofll for Air/Oil $trvlct ire given Iff Shell Will Col,ttrol Mlnull. AppindlK 6.1~. A fotltlnl held Ihlll H Provided orl Alr/Qii Service OPTIONAL 12 I w~lr:fllngl, or bM'e'protlctor . ' ' 19 Gate valve ,, :20 Line to ro~ltide con .r~.tion , ,, 2" , 21 L Fl°firthg blowout pre .~.~ter _ , ,. ~ i L 22 Gltevelv,.pow~f....op?rl_~._.d r~ ~ 6'~ DRAWING & CHECK LIST 104A' SHELL CLASS 5M SURFACE INSTALLATIONS NORMAL AIR/GAS* FOR AIR/OAS DRILLING CONFIGURATION A ANNULAR PROVEN?ER BLIND RAM PiPE RAM -- l. i i i i ii ill i i ~ ,, · Insi~ BOP, ~rf~ ~. f~ e~h size drill pi~ ~ · Full ~ni~ ~ll ~ for aach size ~iil pi~ i~ ~ · ~lted crosso~r ~ f~ e~ differenl c~~on i~ drill OPTIONAL AUXILIARY EOUtPMENT · Circulating head fo~ ~ size drill pipe in u~e with steel pipe trod C~ik.~n joints to re~h stand pipe connection. · Inside BOP - Drop or downhole Cup or plug type BOP tester with spare seals. _ SHELL MINIMUM HYDRAULIC OPERATING UNIT SPECIFICATIONS Accumulator volume -- must deliver 1.5 times th~ volume to make position change on all hydraul- ically operated units and retain 1200 ps; (2C)0 psi above precharge) without pumps, Pump capacity to obtain 200 psi above accumulator precharge prer~dre in two (2) minutes or less, while closing annular preventer and opening choke line valve. See Section 4.31. Power for pumps - 2 sources required - Air-Electric or All Air (rig air plus separate air tank) - 2 , pumps required. Lines from operating unit to BOP units 5.000 psi Minimum Yield I~ Seamless s~eel lines .90" minimum I.D. ~ Seamless ~teel lines with Chiksan joints. ~ Hose per Section 4.32 C~r,atin~ unit fluids' Hydraulic oil or soluble oil. All controls shall be clearly marked to show unit operated. Blind Ram cootrol to have easily removed latch or .guard. ,Sufficient bottled nitrogen or other back-up storage system to equal accumulator capacity, manifolded to by-pass accumulator and close BOP directly. Alarm, or visual im:licator to show when accumulator is shut off from ]preventers. SHELL MINIMUM MUD sYSTEM REOUIREMENTS Pump ~troke counter~ e~ pump. Degasser. Pit volume recorder with alarm. Flow line moflitcx. . OPTIONAL MUD SYSTEM EQUIPMENT Trip .tank (with 6tt~ man) Flow fine gas separator. MISCELLANEOUS EOUII:~ENT SPECIFICATIONS AND INSTALLATION INSTRMCTION$ 1. All conrectiOn~ ,!~I! be welded, ~tudded, flanged 2. NJ fll~ ~II ~ AP& 6B w 6BX o~ ri~ ~ke~ ~II ~ ~ ~1~ I~ ~ ~Mnt~ ~n fb~ ~e ~. 5. ~f ~te ~1~ s~l ~ ~~ ~ ~~s. ~Xte~ ~yo~'~) r~y for ~. ~. FOr ~ ~ ~ ~ ~t~ ~ti~ ~ ~1. ~ ~ mti~ k lo ~ I~t~ ~r ~ ~'~ ~iti~. I~rat~ ~iti~ of ~ ~ote unit i ~t liS, ~ible from I I~v ~uotion r~te. Hydraul~ li~ ~y ~ hi~ F~re h~ W~id~ l~y ~t the ~uire ~nts ~ ~i~ 4.32 in ~e S~ll Well ~ntrol ~n~l. N~i~ ~ hoti~ ~Id ~ pr~i~ for ~~t~, ~t ~tem, ~o~ ~ni~ ~ co~itio~ ~rrmnt ~ ~re ~t of ~ ~ f~ me drill ~ in ~ ~I ~ ~t ~ r~. 10 ~y m~lign~nt of ~ ~ld ~ c~r~t~ to lVO~ 11. F~r ~y ~1~ ~tt ~ k~t ~n or cl~. not in ~tml ~it~. 7. eNor al~plicmble to well aerv~c~n; without drill pipe. MINIMUM I.,,.,OKE MANIFOLD DRAWING NO. 2028 SHELL CLA$Sg. 5M~ SURFACE INSTALLATION NORMAL RESERVE PIT OR ATMOSPHERE tMAIIIINI~! MUO T&NK SHE. EL MINIMUM REOUInEMLN I ~ ............ c~.. ~ ..... 'Cl.;' ~, ....... c~."~ M~N. ~tN. MtN. I,D, MIN. PRES~.' ID. MIN, PRE~. I.D, MIN. No, (Inch) NOMINAL RATIN~ (Inch) N~tNAL RATIN~ (l.ch) NOMINAL RATING ~ c~ ~'.~;~*'~z' ' ....... ,. , ' .... , . a.~/, ~.~ .... 3 ~,, v,,.,,,', ~/~" 3.~ 3,/~.' ~.~ 3~" ,0.~ , ....... ~ ...... , ,' 2 1/16" 5,~ 3 1/ ........... ~~.,, ~.,.. ~,,,~. I~,~ ~,,,~..~,o~ ~,,...x , .......... ..................... 5,, 6 o.~. v.~v~ 3 ~/~"~ ....... 3 ~/~" 5,~ 3 ~/~" / ~0.~ Cro. ~;x3"x3"x~;' ...... ~0,~ .~,.,. .... ~. ..... ~.~,' ....~.. , ..... ~.~ ...... ,o.~ 9 ~nUll Adjultlble Ch~e 1" .~ 3,~ 1" ~,r~ .... 2" ~ 10.~ 10 '" MenUal'Adiua~le"Choke(3} '" 2.~ 3'~ 2,,'" 5,~ 2"~ 10,~ ,, , .............. ..... ....... . _ . valv~ and I~n~ ...... : 13 j Lin. / " ~., ~ 3,~ 2" 5.~ ~' ~ 10.~ ,~ L,~. W ":"' :h~:,',' ' "'" '.~ '" 17 :: T~ 3"x3;"x3'' " ' / , 3~ "2.~' Cm~ 3"~3"x~'~3" ~ ' 16;' ' .......... v. ,., ,o.- .. ,~ .... (1) Only one ~quired in Ct~s 3M. (21 Gate valves only shall be used fOr Class lOM. (3) Remote operated hydrlulic choke mquir~cl on Clasl tOM for drilling. re) Requirement! ere for new manifolds. Ex/sting man/folds may contin~ ~ have a working pme~ of f~ m~ifold ~tior ~nlf~ of firlt vtl~ ~yond ~he choke throu~ the/elf vll~ in any run of not leal fhan 25% of the working ~ml~re of ~e cboe, ~r~ng ~n~dy m~k~ "CAUTION.LOWPRESSURE VAL VE-O0 NOT CLOSE AGAIN3T WELL PRE~URE." "O ~ EQUIPMENT SPECIFICATION~ AND INSTAL~TION INSTRUCTIONS 1 ~ con~onl in choke m~Ifold Ihlll ~ ~ld~. Itu~d, flln~ or C~.ron ct~p of c~Derlble feting. *~. A~I flen~lll ~ APl 6~ o; 6BX end ring g~ketl thMI be APl RX or C~el ~ ~uiDD~ with tun.ten clrbi~ teetl I~ ~ldl~, I~ r~l~ements thlll ~ C~e m~ld D;lttu~e Ind st.ndpiDe oretture g~t ~ ~ ~lil~le et the choke menifold to Islist in re~llting chok~. As ~ wi~lut~lt< chokes, ~ chok~ mlnifold pr.lture ~u~ ihlll ~ I~lt~ on the rig fl~; in conjunction with the Itl~ D~u~ ~. ~ drilling ~ool to chokl should b. Il ~ pOllibte. Lines downstre~ f;~ chokes Ihlll mike turns Linl mlnifold ~* h ~'Ot~ .;~ llnll f;~ chnke., chok~ hy~l~l ~nd fr~ t~ of gel ~lvltOf th~ld b.nt ~l fer et D;~t~ll fr~ the ~11. ~;:~ Addltlonll ~tf~etiont for S~ Se~vlc. end Air/~ll Sewtce l~e glen tn Shell Well Cont;ol MR~ull, Apoend~. 6.17 end A~endi. A 23-01 '~' MGS A23-01 PRESENT ZONE ABANDONN,?NT PAGE 14 ~. 13-3/8' at 2393' TOC/KOP at 8110' BRIDGE PLUG at 8165' TOP 7' LINER at 8171' 9-5/8' 47# at 8565' 1lC/gal MUD TOC PLUG at 10018' BAKER MODEL D PACKER at 10690' 8/11/87 PLATFORM 'A' 9/11/87NTS SOLIDS CONTROL 100 BBL STORAGE TANK 15 HP DEGASSER DERRICK '~-~--- F L O- L I N E JET 40 HP CENT, 75 HP CENT, DESILTER ¢ 1 SUCTION 75 BBLS 1.26 BBL/IN C~HARGE PUMP ¢2 SUCTION 75 BBLS 1.26 BBL/IN SHALE PIT 75 BBLS 1,26 BBL/IN H~RGE PUMP HOPPER MUD PUMP ¢ 1 MUD PUMP ¢2 Legend N SUCTION ~ DiscHARGE STATE OF ALASKA ALA;. , OIL AND GAS CONSERVATION COI~~ 'SSION APPLICATION FOR SUNDRY A -PROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~J Re-enter suspended well - Alter casing E~ Time extension ~ Change approved program ~ Plugging ~ Stimulate [] Pull tubing ~ Amend order D Perforate L~ Other [] . Name of Operator Shell Western E&P Inc. Address 601 West Fifth Ave., Suite 810, Anchorage, AK 99501 Location of well at surfacePlatform "A", Leg q, Conductor 28. 63.q5'S & 56.79'E from Leg 1 ~ 1627'N & q35'W of SE corner At top of productive interval of Sec. 11, TSN, R13W, S.M, 5229'N & 2q36'E of surface location At effective depth 5430'N & 2385'E of surface location At total depth 5720'N & 2284'E of surface location 5. Datum elevation (DF or KB) 116' DF feet 6. Unit or Property name Middle Ground Shoal 7. Well number A 23-01 8. Permit number 72-12 9. APl number 50-- 733- 20238-00 10. Pool "A" Pool 11. Present well condition summary Total depth: measured true vertical 11,202' feet Plugs (measured) feet Effective depth: measured 1 0 , 01 8 ' feet Junk (measured) true vertical feet Casing Length Size Cemented Structural Conductor Surface 2393' 13-3/8", 61#, J-55 BTC Intermediate 8565' 9-5/8", 47#, N-80 BTC Production 2860' 7", 29#, N-80 Liner Perforation depth: measured 10,118-11,000, (7 INTERVALS) Measured depth True Vertical depth 1940sx 2393' 1200sx 8565' 470sx 8171 '-11,031' RECEIVED true vertical SEP 0 Tubing (size, grade and measured depth) 3-1/2" 9.3# EUE 8RD set ~ 9746' Packers and SSSV (type and measured depth) Packers set ~ 10,066'; 10,387'; Alaska Oil & Gas Cons. Commission Anchorage 2-7/8" 6.5# N-80 EUE 8RD set ~ 97q7-10,723' 10,495'I 10,551'; 10,607'' 10 690' 12.Attachments Description summary of proposal,~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation S spt c,,-,5c- ~n 1957 14. If proposal was 'ver'b~Ily approved Name of appro~r'~ Date approved 15. J hereby certif~t~at t~e forea~Thg is true and correct to the best of my knowledge ¥,V. U,, qh. tt ~ l/l,1 7/ I/ . 7 /, Signed //'//~,/L.~/---~. . Title.Divisi°n Operations Manager Date 9/02/87 Commission Use Only Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved by Commissioner by order of the commission Date ~t~ ~ ;;~ Form 10-403 Rev 12-1-85 RRRF/~ e:a .02a Submit in triplicate PRESENT STATUS' The well has been killed, 9-5/8" casing repaired, all tubing and packers removed, and cement placed across the Hemlock (top of cement at 10,018'-+). · · e me If the 9-5/8" casing has been derated such that 7" casing will be run to surface, nipple down the existing 13-5/8", 3000 psi x 11" 5000 psi DCB spool and replace it with a 13-5/8", 3000 psi x 11", 5000 psi WF spool. If the integrity of the 9-5/8" casing is such that it may be reused, replace the DCB spool with an AP spool. After nippling up, test the BOP stack to 5000 psi. Pick up a bridge plug and set it at 8165' (top of liner is at 8171'). Pick up a casing mill for 9-5/8", 47# casing. Mill a 50' window from 8100' to 8150'. POOH. Run in hole open ended to the bridge plug at 8165'. Set a 100 sack P&A/kickoff cement plug. POOH. Estimated top of cement is 7885'. VEU6/0828 (8) (lO ~ B) (4) ~ '~.~.~. ~-/s--~?,, (14 turn 22) '(23 r2::ru 28)'" (6) OTHL% rev: 01/28/87 6.011 2. Is ~ to be located in a d~ned pool ............................. ~ ..... ,. ~. Is wall located proper ~ ~uance ~ prop. ~'cy 't~na .................. 4. IS ~ located p .~ disrmmce ~ other ~ . .' ................. ,, 5. Is suffi~u undedicaued a~eage available in this pool ............ ~ ,,, 6. IS ~ to be daviated and .is wa!lbora plat inn!triad ............... 7. Is operator the only affected par~ ............................... , 8. Can pem=i: be ~approved before fifu:een-day wai= . [ ................. ___ 9. Does ~operator hava a bond in force .................... 10. Is a conservation order needad ........................ 1!. Is admimis~-a~iva appr. oval-needed ..... ................ 12. Is the lease r,~er aD=r~ata ............. 13. Does the ~.l.-~ a {J~i~ name ~['~.~'~'~'..:'. .... ::: 14. IS condn=r~r st=lng pmm~dacI ........................................ ,, , l~. Will surface casing protect f=ash wana= zones ....................... 16. Is enou~ cen~ut used uo ~~ua on condndr~r and surface ......... 17, Will cement ~ie in s~aca and intermediate or production strir~s ... 18. Will cen~mt cnver all ~ pr~dunnive horiz~ ..................... ~ 19. Will all casing :~ive adaqua~ te safety in collapse, tension and burst.. ~ 20. IS this ~ to be kicked off fmnn an e~.s~ wa!!bora ............ = 21. Is old w~!Tbora abaz~t proce~e includad on 10-403 ............ //~ 22. IS adequa=a w~!Ibore se=ara:ion, proposed ............................ ,~ 23. Is a divarzer system re~ved ......................... .- ............. 24. Is the drilling fluid progrmn schsmauic and ~ ~t of equipment adaquate 25. Are necessary diaErsms and aes~-'ipt:ions of dL-: ..... .=_i BOPE at?.acJaed. ~- 26. Does BOPE have maffir_ient presm=~ =arizg - Test to ~ psig .. ~ 27. Does ~ choke m~r~fold r..c~, ty w/AP1 RP-53 ~ 84) .................. ~ 28. Is thru pres~ of t~2S gas probable ................................. · ~ For exp. lorato=y and S~-~tigr-aphic wells: 29. Are data presented on pot~l ove_~rassurs, zones? ................. 30. Ar~ seismic ~lysis data presented on sh~llmw gas zeroes ............ 31. If an o~shore loc., ar~ survey resul: of seabed ccmditions presented E Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve'the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. · SChl, u~,erqer Page 2 ~ L, Or~ical LI~ str~]c loqical tape i. - . ~]t: !oqlcal ~1. S/.4 jnr, r on sortie or ot1 of :f togical reels on f lo~]lcal 'fil. es on of: pnvsical records o,f encrvr)ted records d~ta fra.mes it%alex channel na,~e . index units ~.nemonIc ~::>ri~narv index value prir~'~ar~ inOex value Reel header ;46 Paqe Tape [~'ile i';eader R!?~,v ,C0!. Tai?le type CC'~i':!5 Table t:ype CEi~;~- Page 6 '~0!') ~FT 5 ?~ OCO ~': (., V 3 1 1 .4 73 4200000000 ETT~~: ~FT S 9a 636 2! (; 3 1 I 4 68 4000000000 SGP PPT PdI[; 98 814 O0 () 3 I !. 4 68 4200000000 POF~: ~FT 9~ ~1~ O0 0 ] 1 1 2 49 6200000000 P'I'F~'~ ~FT 9~' 81 ,i~ (',o 0 3 1. 1 2 49 4200000000 p!~ ~,~ [~FT 91~. 81. 9(') ':;/~ 3 ! I 2 49 4200000000 P]')~O ~FT 9a 8t. 4 O0 v 3 1 ! 2 49 4200000000 GF' UFT (gAP1. 9~ ]10 Ol ~ 3 1 1 ~ 49 4000000000 gr~,:~ of set 7863732 7875504 655 31., I 65629,2 19973.8792 2000],78016 File {:eader RF'T .C'i.!4 87/! 2/03 7':a ~:~ i e t y [")e !':~ata force;at spec!ficatlor~ record :L, jstinc! of! set B ty~:,e 64~:~3 ooject 0 2 c 66 ~ I 66 b o ~73 4 ~3 6 o '13 4 9 . !. I :~ 65 4 !1 t4 66 1 1. 4 1 J ,,~ 65 4 ! 6 1 6 o 1 ~ 0 60 of: set l,.t~ti.~c~ of: set ~i/~,'tY 8E~V [.li,~I"~ SER~/IC<, /~Pi APl APT AP1 FILE NUmB ~,.~tJM8 SI~,,~ REPR PROCESS O~D~iR ......., [,0~;.. '"l"ypv. CL~gs~...~ ~'i~'~[~. ;~(t~'~B,. EL~:~ 6~;'4P CJDE (HEX) TC3D K:F' at). 0 {) 4 1 4 7 8200000000 9a 63~ 21 o 4 1 1 4 68 8000000000 9~ 814 oo 0 4 1 1 4 68 8200000000 9g o14 06 ,o 4 1 ) 2 49 8200000000 9~ 9!4 oO (~ 4 l l 2 49 8200000000 9H 814 O0 ('~ 4 1 I 2 ~9 8200000000 9~ 814 On o 4 1 1 2 49 8200000000 ~ 310 O1 0 4 1 1 2 49 8000000000 mmmmmmmmmmmmmmmmmmmmmmmm~mmmmmmm~m~mmmm*mmmmmmm~m~mmmmmmmmmmmmmmmmmmmmm~mmmmmm Enq of set record type 0 i);:'p'r 1256~40 .1I~'~ ].0472,. ~'f 3191.8656 2~000165a ETI:-~ !.2(:,9 8G¢ 11~99, POix~E 9 Data record typ'e 0 !)EPT 124056(~ ,1I!~! 10338, FT 3151,0224 ~ 'T' (.] f~ 250 ~) ~'~ 2 ~} 2 t~ ~3: T I '.'~ ~ 69, 2,." 589 o~" "~ P ! 5~40, P ~ N E 0 co d tyo 0 ~,~: Pr 2 5 (, ,1i~ 10304,5 Fr 3140,8116 a 250002125 ~:'I'1''4 468,167~ SGP 1.6495, PO~E 5 ~0 .... I I P'il.e traiter :.i[r:f .0~.)4 End o~ set Fli~ trailer , ('i ('i 6 1!'2/03 Listt. n¢~ o F~ .End of se Table t F,ile tra!. I er }~l.'q ,0©6 Fi, le he~,der t~P:"I~ ,0 0 7 P- '~? T ,0 0 7 Tat..,,!e type COi:~5 O6:1i:46 Page 13 9a 635 ?1 O '7 1 ! q 68 4000000000 98 SI4 O0 0 7 1 I 4 68 4200000000 98 81.~ (iO 0 7 t, I 2 49 4200000000 9~ ~1.4 ©("~ 0 7 1 1 2 49 4200000000 9~ 814 ©0 0 7 i 1 2 49 4200000000 9~ ~14 ~(~ 0 7 I 1 2 49 4200000000 9~ 3!i~ Ol 0 '7 l, 1. 2 49 4000000000 ~.,r ot set Data record type 0 :!~P~'l" 7a63732 ,l!a 65631.1 ?T 19973,87928 TO~:) 25o0(~2651 E~'~ ;'~ 0.30! S(;P 51~9. P(:)NE 9 vlHo 5, Data recora t:y~e 0 UEPT 78717~8 .t1.!'~ 65597,9 FT 19994,2399~ a TO[~ 25Oi.)(.~2851 ETI!~ 200.6985 S~[~ 5176, PDNE 6 trail, er File header 30,22 T e r, 1 e Ii '7 type Listing Of set 2f~ type Er, c~ of set F:~ata format $;:.~ecifl. catior recorci l...,Istir!q of Set 7 tyne !. ~) 6 6 object o6:11:46 Paqe 15 98 636 2! o ~; I 1 4 68 4000000000 98 814 oo o ~ I 4 68 4200000000 98 [~14 O0 0 8 I '1 2 49 4200000000 0~,~ 814 O0 i) ~ i 1 2 49 4200000000 9~ 814 (JO O ~ ~ 1 2 49 4200000000 9~ i~ 14 09 0 fi 1 I 2 49 4200000000 g~ 310 0! 0 ~{ I I 2 49 4000000000 E~'~ci O.t se't [)ata record type 0 bEiF't'.'~ 7863732 .I:Ii~ 65531,t VT 19973.87928 ~ ~r'~!~~.,,., ,.,. 2. p,,,:,~.~ ~, ~:~:~ s. (;~ 1 ~. 38 record type 0 t)~i:F.'t' 7~67740 ,lin 65564.5 ~'T 19984,0596 M 2 5 o o ~'> 3 2 3 ~ ~.:~ T.t J',?~ I 0 0.4'15 3 5 (; P 5 2 2 1, P O N E I 2, HUe. 2. P HO 5, (;R 2~1,4 Vile traJ let 30,72 871121O3 P a ---------....,,,.---... . 7863732 7868808 6553t,1 65573,4 19973.8 19986,77232 File Deled. er PFT ,(;09 30,22 PR ~'i!e tr~tler kFT Tamle t¥oe COi'::..i Table tyoe Ci,:I r e co r d 56 79 2 65 5.5 object Page 19 ETI~! ~FT G 98 6,36 21 (; 1! I I 4 68 4000000000 SGP !~'FT PSI(; 98 81,4 O0 0 11 1 1 4 68 4200000000 PO~"~; RFT 9~; ~14 O0 O 11. 1 1 2 49 4200000000 P~E~ PF"r 98 814 c~O 0 !1 I I 2 49 4200000000 P~t..!~,~ RFT 9g ~ 14 O0 0 t 1 I 1 2 49 4200000000 pTi-lO [?FT 9a ¢14 O0 0 11 i i 2 49 4200000000 Ga kFT Gl Pi 9ti 31 (7) 01 0 I I 1 1 2 49 4000000000 ....... . :.~[;.FP 7~63732 ,lin 65531,1 FT 19973,87928 250004314 ETi~,I O 274 o~P Slag, PONE 9 d, PH;.!~:i ], PTHO 5, ,.gR 1~,7 l)ata record ty~a 0 i.)~;'P!: 7867'140 ,.11:,i 655~:4,5 FT 19984,0596 TO[) 2b00044'14 ETIP i00.4743 S<;P 5189, PONE 9 File tral. l. er ,~v"r ,01.1 !'">E~'::~ ,, ~ 655.31,1 65582,3 OEP.? ,,~ 199'73.8792 19989,48504 [.,iStir~9 of set 9 type C:'::}i"~':: FOEP :,.:,':~L F F' 10615.2 ?<r~d ot set Table type C s~,ec:ilic,attor',: record 9-FE~;?~-~8 0~:1!:46 Page L~stioc~ o'~ set U ty:~e C"~A T 0 O ~; FT g c~ B 0 q 0 0 ~'~ 0 12 ! 1 4 73 ~.~ , ., ET I.~' RFT $ 98 6]6 21 0 12 i 1 4 68 SGP PFT PS!:G 9F al4 O0 0 12 i. 1 4 PO~.~ (: ;,: ~ T Ot~ b14 (:,C~ 0 12 1 I 2 49 P :J U ~,; ~' F ? 9 ~i ~ 14 0 (", 0 12 I 1 2 49 G~? aF"'r C~PI 9~', 310 O! 0 12 1 I 2 49 En~ o~ set 4200000O00 400000o000 4200000000 4200000000 4200000000 4~0000o000 4200000000 4000000000 Pi let fa31, er i,~F DEPT F' 05531, I 65572,3 DEPT ~ 19973,8792 19986' g3704 . . ~'l!e ~eader t<YT ,013 L.i...st.i,.nc~ of set 6 t¥,~,e EnO of set 1 for~:~at speciiicatlof recoro sklno of set,, 1. i) type 6~hi~ o~ject 0 636 21 0 13 I 1 4 68 4000000000 81.4 O© 0 13 I 1, 4 68 4200000000 814 O0 0 13 1 1 2 49 4200000000 ~14 0C O t3 1 1 2 49 4200000000 814 O0 0 !3 i, 1 2 49 4200000000 B!i O0 0 13 1 1 2 49 4200000000 310 01 ¢! 13 1 1 2 49 4000000000 v,r~..~ of set. Data 'record t::¥~,.e 0 [>FP<:F 7863'132 .lin 65531,1 FT i9973,87928 ~ Data record type 0 I.~LPT 7.%7174~ ,lt:i,d 65597,9 FT 1.9C~94,23992 M ImImmII'Im.~Imemlmm~immIm~m~mmm,~mmmmmiIIillmmiImmmmmmmmmmmmImmm~mmmmmmmmmmmmm I/, 7(;0,674A 5GP 5097, PONE 7 pT~;':i 9. PraO 5, , . Data record type C,' i76Pt* 7f~3772 ,tI~¢ 6569:s,1 ET 20024,78388 . Data record t:.VPe (; OEP']* 78.~37780 .1I~ 65731,5 FT 20034,9612 o ..,~ 4956. "'" 1'7 [3 I.~ 25 ~',) 0 ~"~ 5 ~ 72 E ? I ~ 601,469 ~ ~ [)ara rocord t...v~:~e 0 t.)EP'I; 7895796 .tin 65798.3 f"T 20055,32184 '~ T{?D 250005872 ETI.~'~ }~01.~705 *~P 5776. ......... ,.,. . PONE 6 .... . . ~"' 50216 f;ate record type f'~ bEPT 7fe99aO,~ l Ii', 65a31 7 . ! 20065. Tr![) 250005S72 ~;T~:.i 902.07n9 SGP 5280. PONE 0 ~)ata record type 0 ?)f{;PT 7903~1~ .11~: 65865.1 F't 20075,6824B ~4 '"'" ...... ' ...... "'"'~" ...... "'""~'";;~: .... ';'"*i'"'""'"" 3.57 44~¥ !.~ 05 3a~5 ~,; 863 ' ~ 7907580 i)EPT 6553~ 1 65896,5 ~';EFT ~q 19973 8792 200B5'2532 (E :] i.') ) SCHLUMBERGER PAGE L~S/U PHYSICAL RECORD M;~.P P: MTAO:[?ZB~O]LIS~.D~T; USING COMe, AND L!ST/OYNAHIC/OUTPUT:(SAMLVP.L'IS)/ST~T.[C JOB NUMBER 725~0 COMPANY NAME SHELL WESTERN E & ~, INC. WELL NAME A-23-01 RD (~PI SO-'733-.ZOZ38-01) FIELD NAME MIDDLE GROUND SHOAL (gTE/LOT) C~UNTY KEN~I STATE ~L~SKA S~RV~CE ORDER NUMSER D~TE 3-FEB-88 RUN NUF~B~f R ;CHL~JM T~EqG~R PAG5 \ LIST COMMAND LZSTING KEY \ LIST SUMMARY MNEMONICS SUMM~RY DU'TPUT IS CREATED BY LIST/SUMMARY SU~,M~RIES WRITTEN ~OR LOGICAL LIS STRUCTURES: FIL~ (~9~REV: m) LIS LOG.IC&L FILE iNFG TAPE (~B~REV: T) LIS LOGICAL T~PE INF~ ~EEL (~BBREV: R) LIS L~GZCAL REEL ZNFO ~ND ~0'~ THE ~N'TI~E LIS/A ~NPUTL~ OG!C~L UNIT: CU (~B2R~V' L) LZS/~ LOGICAL UNI~T ZN~O THE FZELD L~ELS APREAR ~N SOME OR ~[L O~ THESE SU.~M~RIES, ~S iNDICaTED 3Y THE ~SBREV. ON RIGHT. SU~RY =IEL~ L~ELS: ~EELS NUMBER D~ LOGICAL ~EELS QN (L ) 'T~PES NU~ER OF LOGICAL 'T~PES ON (LR ) FILES NUMBEP O~ LOGICAL FILES ON (LRT) ~PR NUMBER 0m '~HYSIC.~L RECORDS (LR'TF) :~LR NUMBER ~ LOGICAL RECORDS (LRTF) .~R NUMBER OF ~T~ RECORDS ( F) ':~E'NC NUMBER O~ ENCRYPTE~ RECORDS ( F) ~F?4 NUMBER PF DAT,& FRAMES ( F) PI mRIMARY INDEX CHANNEL NAME ( F) ~*_UNZTS~ - ~RIM~RY IND:X:~ tJN'ITS MNEMONIC ( F) MAXPI M~X~MUM PR INSRY ~NOEX VALUE ( F) M~NPZ ~IN~MUM PRIMARY INDEX VALUE ( F) ~CHL!JME~ERG:R LZST _MT~g:£72E40]LIS.~.D/~'T; ]-F'--B-88 07'30:22 PAGE 3 ~EEL HE~DEP ~. RE:L HEAD~=R SERVICE NAME : EDIT ORIGIN : REEL NAME : CONTINUATION -~: ~ PREVIgUS ~EE'L : COMMENT : LI~Y T ~P E TAPE H':E AD ER S'~SR VIC E N,~ME : DhTE : 88/02/ ORZGIN : T25~ TAPE NAME C ~NTINU~.TION P~EVIGUS TAPE : CDM~ENT : LZBR~RY TAPE (EOF) =ILE HEA~ER ~DIT .001 .~J~ FILE HEAg_~R :[LE N~M~ : SERVICE NAME : VERSION ~ : ~ATE ,'. ~X. REC. LEN.: ~ILE TYPE : PREV~OlJS ,=IL~ EDiT .001 102 ~O:'4P&NY = SHELL W=STERN- E $ P, INC. WELL = A-23-0! RD ~PI ~ = 50-733-20238-01 ~I~LO = MIODL~ GROUND SHOALS {OPOUGH : KEN~I STATE : ALaSK~ JOB NUMBER AT ~KCC: 72540 RUN ~!, gATE LgGGED: 2-D=C-87 LDO' ST[~H~N F. ST6V=NS C$SING = 9.625" @ 8178' 8.5" TYPS FLUID : 1% N~CL LIGND D~NS!T~ : 12.20 L~/$ miT SIZE SCHLUM~E..RGSR L"¢,T.~..,~ ~r~o-· [?25'~O]LZS.4.naT;_, -- 3-FEB-88 07:'30:22 PAGE VISCOSITY ~LUIO LOSS = 1.,.400 :9 63,0 DF = 32.0 2MF : 0,793 i~ 63,0 OF 9.5 ~MC : = 1.~30 i~ 63.0 ~F = ~.2,,~'~ RM ~T T = 0.576 ~ 163.0 DF THIS DATA HAS NOT i~EN D~PTH SHIFTED VERLAYS mlSLO PRINTS ~x,q:$.¢ SCHLUMBERGER LOGS INCLUDED WITH THIS MAGNETI,C TaPE · DUAL INDUCTION S~HEP, ZC.~LLY FOCUSED LOG COIL) D~T~ AV~ILa~2LS: 11550' TO 8950' L~.THO '= ~ · .. ~ ~ .... NqlTY CCM~N'SAT~9 LC'3 (LST) DAT~ AVAILabLE: 11550' TO T970' D&T~ :OR~T SPEC.IFIC,~TION RECORD LISTING ,"3.: S=T 1 ENTqY VALUE 2 0 4 1 3 60 9 .lin 16 1 0 3 'TYPE :64EB OBJECT 0 REPCJDE SIZE 65 73 65 66 =ND OF SET SCHLUmbERGeR LIST MTAD:[?Z540]LZS~,gAT: 3-FEB--83 0?:30:22 PAGE LISTING OF SST O TYPE CH~N NAME SERV UNIT SERVICE AP1 API ~PI APZ ID OROER ~ LOG TYPE CLASS DEPT mT 0 0 SFLU ~TE CHMM 220 01 0 O ILM DTE OHM~ 120 ~4 O 0 ILD ~TE OHMM 120 TENS OTE LB 635 21 0 0 HTEN gTE LB 0 G~ gTE G~PZ 310 TENS LD'T LB 635 21 0 0 C~LI LOT IN .2~0 01 0 O LL LDT C~S 354 01 0 LU LDT CPS 354 01 0 LS LDT C°S 354 01 O 0 LITH LDT CPS 35~ 01 0 O SS1 LDT CPS 0 SS2 LDT CoS 0 0 PEF LOT 358 O1 0 QLS LDT 0 0 QSS LDT 0 0 ~HDB LDT G/C3 35'0 02 0 9 D~HO LOT G/C3 356 01 0 DPHI LDT PU 890 O0 0 O g~ LgT G~PI 310 01 0 0 HTEN OT~ L~) 0 O FILE NUMB NUMB SIZE REPR PROCESS NU'4B ELEH SA~4P CODE (HEX) 1 ! 4 68 O0000OO000 1 1 ~ 68 O00000000O 1 I 4 5B O00000000O I 1 4 68 0:000000000 1 1 4 68 0000000000 1 ! 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 :O00000000O I I 4 68 O000000OOO 1 ! 4 68 0000000000 i I 4 68 0000000000 1 1 4 68 O00000000O 1 1 4 68 O000000OO0 1 1 ~ 68 0000000000 1 1 4 68 0000000000 I 1 4 $8 O000000OO0 1 1 4 68 0000000000 1 I 4 68 O0000OO000 I 1 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 1 I 4 68 0000000000 1 1 4 68 OOO0000000 1 1 4 68 0000000000 DATA PSCDRg 'TYPE 0 gEPT 1'15~9.5 FT 3532,48 M DEOT 11589.5 SFLtJ 2,716797 ILM TENS O. HTEN -60, SP TENS -999.25 CALI -999.25 LL LS -999.25 LITH -999.25 SS1 ~EF -999.25 CLS -999.25 ~SS D~HO-999.25 O~HI -999.25 GP 3.658203 ltd 8.5468'75 83.4375 GR 47.1875 -999.25 LU -999.25 -999,25 SS2 -999,25 -'999.25 RHOB -999.25 -999.25 HYmN -60. D~T~ RECORD TYPE 0 ;'3EPT 11439.5 mT 3502. M DEPT 11489.5 SFLU 9.023438 TENS O, HTE~ 378.75 SP TENS O, CALl 9,25T813 LL tS 254.625 LITH 48.0625 SS1 PEru 5.839:34& C, LS 0.017578]3 ~SS RHOB 2.44335-) CRH3 0.02734375 g~Hl HTEN 378,75 10,89063 ILD 10,70313 81,75 GR 42,6875 134,375 LU 240,5 179.625 SS2 Z84.T5 -0.009755625 12.40234 G~ 46.5 SCHLUN6E~GER LIST ~T40:£TlF40]LZSA.OAT; 3-FEB-89 07:30:22 :,9 :&'T~ OEPT sENS 'TENS LS ORHO RECORD 'TYPE 0 OEPT 113~9.5 FT 34'71.52 q ________ ILM 10.71875 ILD 11.22656 SF 76. GR 48.25 LL 111.1875 LU 204'375 SS1 167.37'5 SS2 26'7.5 OSS -0.0,2880859 RHO~ 2.53'7109 GR 49.34.375 HTEN 375.75 11389.5 SFLU 11.0525 O. HTEN 375.75 O- CALI 8. 890625 213.375 LITH 44.625 4.773438 QLS 0°03027344 0..003,4179~9 DPHI 6,787109 3~T,~ R:EC3R'D TYPE 0 DEPT 11299.5 ,3EPT 112:99.5 SFLU 16.60938 ~TSNS 0. HTEN 365.25 TENS 0. C~LI 9.359375 LS 190.75 LITH 38.468'75 r~'~ 5.0,85 93~ ~LS 0. O190~2 97 DRHC 0.008789063 5PHI 2.001953 FT 3441.04 M tt 97.375 LU 185.875 SS1 166.25 SS2 258-25 QSS -0.020507~1 RHO~ 2.615234 GR 107,4375 HTEN 365.25 DaTa RECORD TYPF_ 0 OEPT 11189.5 FT 3410.56 DEPT '1'11'89.5 SFLU 79.1 25 ILM TENS O. HT'EN 348.75 SP TENS O., £ALI 8,085939. LL LS 204.625 LITH 36.0625 SS1 PEF 5. ~8433 QLS 0.013671 ~8 ~]SS RH~9 2.5761'72 DRH9 0.0200~953 OPHI HTEN 34~.75 50,65625 ILO 56.21875 39.46875 GR 42.4375 105.0625 LU 199. 172.125 552 262.25 -0. 002441406 4.394531 GR 39.093'75 9ATA R~CORO 'TYPE O OEPT 11089.5 FT 3380,08 M DEPT 11089.5 S~LU 16.39063 iLM 15.21094 TENS O. HTEN 354.25 SP 72.6875 TENS O. CALl 8.617188 LL 113.3125 tS 2!.9.5 LiTH 41.75 SS1 150.75 PEF 6.570313 QLS 0.005859375 QSS -0.03'308594 ~PHO-9.01513672 D~HI 9.22~516 '3R 63.03125 ltd 15.90625 GR 69. 062 5 LU 212.375 SS2 262.25 RHO3 2.496094 HYEq 35,4.25 D~T~ R=C,..QR3 TYPE :")EPT :13999.5 TENS O. TENS O. LS 212.625 0 9EPT 109:89.5 FT 33¢9.6 M S=LU 39.375 It~'4 25.48438 MTEN 1343. SP 23.46875 CALI 8.085938 tL !11.75 LITH 41.25 SS1 166.75 ItC 25.d, 7188 GR 42.28125 LU 201.875 SSZ 267. SCHLU~SERGER 2.5315156 343. O~TA R~CgRD TYPE 0 gEPT 10889.5 F? 3319.I2 M DE-~T 10889.5 TENS 0. TENS 0. LS 200.25 PEF 5.399~38 RHO~ 2.5605& HTEN 354.5 SFLU 66.6 ~. 75 ILM 47'03125 !LD 63.0625 H'TEN 354.5 SP 3,2.65625 GR ~4.375 CALI 8.¢45313 LL 101.875 LU 196.625 LITH 39.6:!5 SS1 159.25 SS2 256.25 QLS 0.0004882813 DSS -0.03759766 ORHD -0.01269531 OPHI 5.273&38 GR 42.3~375 DATA RECORD TYPE 0 SEPT 10789.5 FT 3288.64 M SEPT 1~789.5 SFLU .42.25 !LM .~ENS O. HTEN 381.75 SP TENS O. C4LI 8.265625 LL LS 202.875 LITH 45.375 SSI PEF 3.890525 ~LS 0.047851~6 DSS ORHO -0.008789963 DPHI HTEN 381.75 26.25 ILD 34.625 33.59375 GR ,40.34375 105.9375 LU 193.75 161. SS2 259.25 -0.03759766 RHOB 2.560547 5.371094 GR 4~.21875 RECORD TYPE 0 OEPT 10689.5 FT 3258.16 SEPT 10689.5 SFLU 17.9375 ILM TENS O. HTEN 41,2. SP TENS O. CaLI 9.875 LL LS 265.75 L!TH $8.1875 SSI PEF 3.199219 QLS 0.04443359 DSS DRHO -0.003789063 9PHI HTEN 412. 18.25 ltd 52.8125 GR 143. LU 168. SS2 -0.04833984 RH08 15.67383 GR 22.75 62.125 245.5 285. 2.390625 62.21875 OAT~ RECORO TYPE 0 DS~T 10589.5 FT 3227.68 M SEPT 10589.5 SFLU 20.95313 TENS O. HTEN 385. SP TENS O. C~LI 8.890625 LL LS 217.375 LITH 51.65625 SS1 PEF 3.2~3203 QLS 0.06787109 ':SS ORHO -0.00732~219 9PHI HTEN 3:~5. 18.375 ILS 46.53125 GR 115.6875 LU 163.375 SS2 -0.03222656 RH05 ?.9589~4 GR 19.71875 64.9375 203.5 Z63. 2.517578 64.4375 ;.CHLUM2ERGER LIS" MTAO:E7Z540]LZS~.BAT: 3-FEB-88 .07'30:22 PAGE -- TYPE 0 OEPT 10389.5 FT 3166'72 M 9EPT i03B9.5 SFLU 47.34375 ILM 13'53006 ILO 15.3125 TENS O. HTEN /+23.25 SP 56.125 G~ 55.78125 TENS O. CALI 10.27344 LL 107.3125 LU 208.25 LiS 211.375 LITH 31.95313 SS1 1B3.5 SS2 ,270.25 ~E~ 7.726563 QLS -0.0'1.367189 QSS 0.0190/+297 RHOB 2.603516 D'RHO 0.07324219 DPHI 2.783Z'03 GR 62.96875 HTEN 423.25 REC~RO 'TYPE 0 O'EPT 10289.5 FT 3136.2~ M !LM 19.25 ILD 20.57813 SP 10.69.531 GR 46.5 LL 118.812.5 LU 2!'5.125 SS1 164.75 SS2 269.25 QSS -0.037597,56 RHOB Z.6921~8 OPHI 9.521~+84 GR 48.875 gEDT 19289.5 SFLU 25.5 TENS O. HTEN .41.!.75 TENS O. CALl 8.4/+5313 LS 226. 375 LITH 53. 59375 ,°E= 3.5~39~4 QLS 0.030753.72 iQRHO -0.006347,656 HT~N /+'11.i'5 DEPT 101,39.5 S:L!J 6.246004 TENS O. HTEN 435.5 TENS O. CALZ 11.4375 LS 221.5 LITH 52.31Z5 DRHO O. 000975552 5 R?C3RO TYPE 0 DE~T 101~9.5 m'T 3105.76 M ILM 6.398438 ILO SP 38.25 GR LL 114.~75 LU SS1 167.2.5 SS2 QSS -0.04052734 ~HOB 9PHI 8.203125 GR 6.941406 69.25 213.375 273.5 2.513672 50.25 DATa RECSRS TYPE 0 OEDT 10089.5 FT 3075.23 M DEO~' 10089.5 S~LU 7. 585938 !LM 5.542:969 TE~,iS O. HTEN 423. SP 330.5 ILD 6.117138 GR 61.53125 SCHLUM'P. ERGER LIST _MT&O:E72540]LZSI.D~'T,: TENS O. CALZ 11.0525 LS 205.5 LITH 47.625 P:~ 3.373047 CLS 0.0390525 D~HO-0.02294922 OPHI 6.6~9453 3-FE~--8 ~ 07:30:22 PAGE LL 1~7.0625 LU 196.75 S S 1 1 S 5.75 S S 2 2.5-8. ~2SS -0.05322266 RHOB 2.539063 GR 65-25 HTEN '¢23. DATA RECORO TYPE ~0 OEPT 99~9.5 FT 3044.8 M DEPT 9989.5 SFLU T~NS O. HTEN TENS O. CALI tS 1~8.5 E!TH ~EF 4.0625 CLS gRHD -0.00:~3~30781 HTEN 39.5.75 10.71875 395.75 11.89063 ~+ 1.5625 0.003417969 ILM 11.29688 ILD13. I7959 SP 333.5 GR 76.8125 tt 95'25 LU 186.375 SSI 159. SS2 :257.75 QSS -0.04833984- RHOB 2.609375 DPHZ 2.343'75 GR 84.8125 DAT~ RECORD TYPE O OEPT 9889.5 FT 301¢,32 M DEPT 9B89.5 SFLU 42.958?5 ILM TENS O. MTEN ,420.25 S~ TENS O. C,~L! 9.87,5 LL LS 20~. LITH 42.5625 SS1 PE~ 3.343'75 QLS 0.04589844 QSS gRHO -0.00~7~9063 OPHI HTEN 420.25 35.21875 ltd 314.75 GR 108.9375 LU 161.75 SS2 -0.03417969 RHOB 6.591797 GR 35.375 38.03125 198.25 260. 2.541016 41.093'75 O~TA RECORO TYPE O DEPT 9789.5 FT 2983.84 DEPT 9789.5 S:LU 14.23996 TENS O. HTEN 392.75 SP TENS O. CALI 10.92188 LL LS 197. LiTH 32.625 SSI PE~: 4.532031 QLS 0.01025391 9RH0 -0.004394531 DPHI HTEN 392.75 11.66%06 !LD 340. GR 100.5625 LU 152.25 SS2 -0.02380859 RHOB 4.49218~ GR 12.59375 57.21875 193. 257. 2.57,4219 52. DaTA RECgR9 TYPE 0 OEPT 9689.5 ~:T 2~53.36 M DEPT 9689.5 S~LU 20.39063 ILM TENS O. HTEN 442.25 SP TENS 0. CALl 8.525 LL LS 228.875 LITH 43.90625 SS1 PEF 5.863281 QLS 0.05125953 QSS 9RHG -0.000z,'38281.3 OPHI HTSN 442.2~ 19.54688 ILO 305.25 GR 121.5625 LU 167.875 SS2 -0.02~90234 RHOB 9.950933 GR 22.6875 45.25 214.625 269.25 2.484375 45.6875 ~CHLU~:RGER LZST _N'TAO'£725~O]LIS~.D~.T; 3-FE~-88 07"30:22 PAGE OATA R~COR9 TYPE 0 9EPT 9589.5 :T 29.22.88 M 05PT 9589.5 S~mLU 11.75 ILM 11.88281 TENS O. HTEN '39~.~5 SP 320.75 TENS O. C.ALI 13.21094 LL 133.625 LS 254.875 LITH 53.375 SS1 177.875 pEm 4.507813 QLS 0.00~882~I~ QSS -0.03027344 DRHO 0.0'185546~ O~Hl t2.7~297 GR 93.125 ILD I2.75'781 GR 93.875 L U 242.5 SS2 291.25 RHOB 2.4375 HT~N 398.5 3~T~, R~CORD TY~E O DEPT 9489.$ ~T OEPT 948).5 S:LU t0.'11719 TENS O. H'TEN ~0'g.75 TENS O. C~LI 8.98~375 LS 248.5 LITH ~9.21875 ~F= 5.210938 CLS O. 042~+~047 DRHO 0.003417969 DPHI 12.8418 2;392.4 M ILM 9.929688 ILO 11.351.,56 SP 298-25 GR 47.53125 LL 132.625 LU 231.75 SSI 171.75 SS2 276.75 ~S..S -0.02099609 RH{]B 2.4375 ~P 48.15625 HTEN ~0'9. T5 DAT~ ~ECORO TYPE 0 DEPT 9389.5 FT TENS RHDB 2.423828 g~Hg 0.06982422 2861.92 M ILM 11.99219 ILD 21. SP 313.5 GR 43.46875 LL 1,48. LU Z6B. SS1 190.875 SS2 297.5 DSS 0.0053'71094 9PHI 13.52305 GR 35.343'75 O~TA RECgRO TYPE O DEPT 9289.5 FT 2'331.44 M DEPT 9289.5 S:LIJ 24.79688 ILM TSNS O. HTEN 420.g SP TENS O. CALl 8.53125 LL LS 208.75 LITH 46.34375 SSi PEF 4.035155 CLS 0.003417969 ~SS DR HO -0.0097~$063 DPHI HTEN 420.5 20.04588 ILO LU zo .s 'l SCHLUN~E;-7, GER LIST t~,TAO:ETZ540]L[S~.DAT: 3-FEB-8.R. 07'30:22 ~p DATA RECORD 'TYPE 0 Dc'. T 9189.5 FT ZSOO.g6 ~ DEPT 9189.5 TENS O. 'TENS O. LS 273.25 ~EF 6.898438 DRHO 0.02099609 SFLU 21.25553 HTEN 393.25 SP 3'14.25 GR 64.812.5 C.~.L 1 11.26553 LL 144.625 LU 257.5 L'ITH &1.8125 SS1 180.625 SS2 284.25 ~LS 0. 00 878906..~ ~SS 0.001g$3125 RHO~ DmHI 15.82031 GR 73.125 HTEN 393.25 OEPT 9089.5 TENS 0. TF. NS O. LS 294. S P E ~,r:_ 9 . 2 g 6 ~ 75 O DEPT 9059.]5 FT 2770.48 M .................... ScLU 5.55525 ILM 6.816405 HTEN 390.5 SP 302.75 GR ,'50. 59375 C.%LI '10.7'5781 LL 155.125 LU 279. LZTH. 5~.3~375 SS1 182.$25 SS2 288,,5 P.,LS -0.0112304? QSS 0.00390525 RHOB Z..~49609 DPHI 18.16406 GR 54.84375 HTEN 390..5 'TYPE 0 DEPT 8989.5 FT 2'740. DEPT 8989.5 S:~LU z~].71875 ILM 42.40525 ILO ~5.71875 TENS O. HTEN 417.T5 SP 297.2.5 GR 67.3125 TENS O. CALI 19.23438 LL 447°25 LU 668.5 LS 78,~. 5 LITH Z21.5 SSI 1'71.5 SS2 325.5 PE~ 4.484375 QLS 0.0234375 QSS -0.04345703 RHOB 1.709961 DRHO -0.04638672 D°HZ 56.93359 GR 62.15525 HTEN 417.75 :D.~'T~ R':CORO TYPE 0 DE:DT 8389.5 =T 2?09.52 M 3E~T 8859.5 SFLU 16.32813 tLH 15.78125 iLO 18.92188 TENS O. HTEN 396. SP 295. GR 64. TENS O. CALl 8.~875 LL 117.875 LU 217.75 LS 22[:.7 5 LITH ~7.3!2.5 SS1 153.625 SS2 264.25 ~E~ 3.8532~1 QLS 0.01171875 QSS -0. 02 ~7 8516 RHO~ ,2.~8~375 'DRHO-g.009765625 OPH'i 1~.00~77 G? 61.~125 HTEN 396. .'I,&TA DEC:]RD TYPE 0 OEPT 878L~.S FT 2.679.04 M DebT,_ P789.5~ S=LU ~3.. .95438 TLM_ 1~.1484z~ ILO TENS O. HTEN 409.75 SP 258.75 GR TENS O. C~L'i 8.525 LL 126.875 LU LS 2~0.25 LIT~ 47.9375 SS1 164.75 SS2 19.3125 54.96875 225.$75 SC HL UM ~E2GER 3-F,E~-88 07'30:22 P~GE .DSS -0.0200.1953 RHO5 2.443359 ~R 56. 5625 HTEN 409.75 12 DATA RECORD 'TYPE 0 DEP'T 8689.5 FT 26,48.56 -- 0'~T 8689.5 SFLU TENS O. HTEN 'TENS O. CALI ,tS 212.37,5 LITH PEF 5.9,76563 QLS DRHO -0.901953125 HTEN 407.25 16.15625 &07.25 8.625 42.4375 0.06933594 IbM 16-07~13 ILO 19-34375 SP 252.375 GR 56.71875 tk 112.75 LU t99.25 SS1 165.125 SS2 261.75 DSS -0.02392578 RHOB 2.533203 DPHI 6.9,82422 G',R 62.1875 DaTA RECgRD TYPE 0 DEPT 8589.5 3EPT 8589.5 SFLU 216. 375 TENS O. HTEN %23.75 TENS O. C&LI 9.00'7813 LS 17t.5 LZTH .32.25 PEF 3.552734 QLS 0.05615234 ORHO 0.0'1025391 DOH! -2.490234 2618.08 M ILM 61.875 ILO 36.53125 SP 252.8'75 GR 34.8125 LL 87.6875 LU 167.5 SS1 163.625 SS2 253.375 QSS -0.0278~203 RHOB 2.589¢53 GR ~6.0625 HTEN ~23.~5 O~,TA RECORD TYPE 0 'DEPT 8489.5 ~T 2587.6 M OEPT 8q. 89.5 SFLU 35,71875 [tM 2';:3.25 ILD 31.07813 TENS O. HTEN 385. SP 283. GR 74.5 TENS O. CAL! 15.71875 LL 202.875 LU 340.25 LS 3'73. LITH :62.99625 SS1 178.375 SS2 30.3. PE~ 4.1189C6 QLS 0.009277344 QSS -0.02392578 RHDB 2.181641 DRHO -9.003417969 DPHI 28.27148 GR 70.3125 NT~N D~TA RECOR9 TYPE O 3EPT 8.389.5 FT 2557.12 OEP? 8389.5 SFLU 13.92188 ILM 17.78125 ILO 19.28125 TENS O. HTEN 366.5 SP 284. GR 83.8125 TE~S O. CaLI 11.52~44 LL I33.625 LU 255.75 tS 262. LITH 53.625 SS1 183.875 SS2 301.75 PE= 4.21093~ ~LS -0.045~1016 QSS -0.03173828 RHO~ 2.447266 ORHC 0.04492188 DPHI 12.2~586 GP 91.3125 HTEN 366.5 SCHLUMSERG.,~R LIST MTAO:£7.25~O]LIS~.DAT: 3-F:B-88 07:30:22 PAGE 13 RECORD TYPE 0 OEPT 8289.5 DEmT 828'~.5 SFLU 9.0156.25 TENS O. HTEN 409.75 TENS O. C~LI 9.039063 LS 229.375 LITH ~7. PE~ 4.?~2t8i~ ~LS 0.05175781 DRH~ -,9.D!3671~8 OPHI 10.74219 :T 2526.64 M ILM 11.39063 SP 2~8.75 GR 69.4375 LL 121,9375 LU .215. SS1 162.5 SS2 265.25 QSS ,-0.03515625 RHO8 GR 66.125 HTEN ~09.75 '9~T~ REC'3R9 TYPE 0 gEPT 8189.5 FT 2496.15 M 3EPT 8189.5 SFLU 11.82813 ILM 13.60156 ILO 15.50791 TENS O. HTEN 364. SP 282.25 GR 90.5 TSNS O. C&LZ 10.55459 LL 111.1875 L~J 204. LS 213.2.5 LZTH 42.1875 SSI 166.8'75 SS2 265.75 ~ ~.0~2969 QLS 0.03271434 QSS -0.0263~719 RHO~ 2.533203 DRHO 0.002441~06 DPHI ,5.933594 ~R 82.$875 HYMN 364. RECORD TYPE 0 OE~T 808~).5 FT 2465.68 M DEPT 8089.5 SFLU 0.3349609 !LM 0.6640625 ILO TENS O. HTEH 383.25 SP 2!0.875 GR 35.5 TiNS O. C&LI 2.886719 LL 68. LU '154.75 LS 1~5.375 LZT~ 16o71875 SS1 133.375 SS2 160.~75 PEF 19.109~8 ~LS -0.05835~38 QSS 0.1386719 RHOB 2.724609 9RHO -0.06103516 DPHI -4.638672 SR 35.65625 HTEN 383.25 'DAT~ RE-C~RO TYmE 0 'DEPT T$;39.S FT 2435.2 DEPT ?989.5 S~LU -999.25 !L~4 TENS -999.25 HTEN -999.25 SP TE~'iS 0. CAL! ~.445313 LL LS 102.375 LITH !2.04688 SSI · PE: 15.~0625 QLS 0.04~45703 ~SS DRH~ -0.~3~9648 DPHi -0.4882813 %R -999.25 Itg -999.25 -999.25 GR .-999.25 47.03125 LU 1.10.625 53.15625 SS2 83. -0.1088867 RHOB 2.65625 33.09375 HTEN -999.25 ,=ILE T~ILER EDIT . 001 ~CHLUMSERGER L~ST ~'Ta.O:[T25~+O]LZS&oD&T; 3-FEB-8'8 0?:50:22 PAGE (ED ~-' FILE TR-, FILE NAME : EDI'T SERVICE N A ~,~E : VERSION .~ : DATE : A~AX. REC. LEN.: FILE 'TYPE : NEXT FILE : F) T~PE TRAiLE~ ~, T~PE TR~ILE~ SERVICE N&ME : DATE : ORIGIN : T ~PE N~ME : CONTINU~T!ON ~: NEXT TAPE : COMHENT : .OO! RE~L T~AILER ED 'Z T 88/0 7254 01 ,"- REEL TP~IL:R -,- SERVICE N~, ,r. EDIT DAT~ : 8~t02/ 1 OR I GIN : R=EL N A ~"'E ' C~NTINUAT~DN ~: ~ ....... NEXT qEEL : COMMENT ' LIBRARY T .~P E 'T ~PE (EOF) (EOD) ! END O~ LISTING _~T~O'['T2540]LIS~,.DAT;