HomeMy WebLinkAbout2006 BadamiANNUAL RESERVOIR SURVEILLANCE
REPORT
BADAMI OIL POOL
JANUARY 2006 - DECEMBER 2006
Table of Contents
1. Introduction 3
2. Summary of Reservoir Management and Enhanced Recovery 3
3. Voidage Balance 4
4. Reservoir Pressure Monitoring 4
5. Production Logging 4
6. Special Monitoring 4
7. Evaluation of Well Testing and Allocation 5
8. Future Development Plans 5
9. Review of Annual Plan of Operations and Development 5
10. Status of wells shut-in for 365 Days or More
Appendices
Table 1 Badami Well Disposition
Table 2 Badami Production/Injection - Surface Units
Table 3 Badami Production/Injection - Reservoir Units
Table 4 Badami Pressure Monitoring Summaries
Table 5 Badami Well Testing Frequency Summaries
Figure 1 Field Production History
Figure 2 Field Gas Disposition Histories
Figure 3 Well Test History of B1-11A
Figure 4 Well Test History of B1-15
Figure 5 Well Test History of B1-16
Figure 6 Well Test History of B1-18
Figure 7 Well Test History of B1-21
Figure 8 Well Test History of B1-36
Figure 9 Gas Injector Performance History
ANNUAL RESERVOIR SURVEILLANCE REPORT
BADAMI OIL POOL
January 2006 – December 2006
1. Introduction
As required by Rule 9 of the Badami Oil Pool Area Injection Order, dated August 26,
1998, this report provides a summary of the enhanced oil recovery operations at Badami.
It will address the following:
• Progress of the enhanced recovery project and reservoir management summary
including engineering and geological parameters.
• Voidage balance by month of produced fluids and injected fluids.
• Analysis of reservoir pressure surveys within the pool.
• Results and where appropriate, analysis of production and injection logs, tracer
surveys and observation well surveys.
• Special monitoring.
• Evaluation of well testing and allocation.
• Future development plans.
• Review of Annual Plan of Operations and Development.
2. Summary of Reservoir Management and Enhanced Recovery
Production at Badami was restarted September 15, 2005 after a field wide shut-in since
August 2003. Production since restart is from five wells. Gas injection is occurring into
one well since restart. Since the last annual surveillance report, one well has been secured
because of collapsed casing and tubing (Well B1-25). Two other wells are shut-in due to
either fill through the perforated interval and above (Well B1-16) or until the cause of
communication between the tubing and the annulus can be determined (Well B1-28). B1-
28 has a tubing tail plug installed to isolate the producing formations from the tubing.
The total volume of oil produced from the Badami reservoir during the report period was
480,488 stbo. A total of 4,202,168 mmscf of gas was produced of which 3,732,274
mmscf was injected back into the producing formation. Two thousand three hundred and
forty-one (2,341) stock tank barrels of formation water was reported produced. No new
wells were drilled or completed.. Well disposition is detailed in Table 1.
A Brush and Flush maintenance program has been instituted to mitigate a persistent
paraffin buildup problem to help sustain production.
The production and gas disposition history of the field during the report period is shown
in Figures 1 and 2. Figures 3 through 8 present the well test history of the producers. All
of the producers showed a decrease in productivity during the report period. Figure 9
shows the performance history of the gas injector.
Connectivity between producer/injection pair B1-15/B1-14 has been re-confirmed
through production data, GOR trends, and higher reservoir pressures since re-start.
Production decline in B1-15 is somewhat lower than historic production data before shut
down, but this is offset by more rapid GOR increases.
3. Voidage Balance
Production and injection volumes and reservoir voidage by month are detailed in Tables 2
and 3. Cumulative voidage for year 2006 was negative736,794 reservoir barrels.
4. Reservoir Pressure Monitoring
Only one static pressure was taken at Badami during the report period in well B1-18. This
static shows that the pressure in this lobe of the reservoir has dropped significantly since
start up. Fifteen statics were taken in 2005 in preparation for the field start up.
5. Production Logging
No production logging was performed during the report period on wells completed in the
Badami reservoir.
6. Special Monitoring
No special monitoring activities were performed during the report period.
7. Evaluation of Well Testing and Allocation
Table 5 is a summary of well testing frequency for each of the Badami wells.
Daily oil production allocation to each well is accomplished by a method of pro-rating the
oil rates such that the total oil produced from all wells equals the fiscal pipeline meter.
8. Future Development Plans
Currently there are no plans for development drilling of the Brookian reservoir in 2007.
No major changes to the current infrastructure are planned.
The field is being evaluated for possible warm shutdown. Monitoring of well integrity
and surveillance activity on the Class 1 disposal well, B1-01, will continue as required.
9. Review of Annual Plan of Operations and Development
The field was granted a 6th POD by the Department of Natural Resources in June of 2005,
which expires June, 2008.
10. Status of Wells Shut-in for 365 Days or More (20 AAC 25.115)
The following wells were shut-in all of 2006.
B1-25 is secured/safedout following a March 2005 RWO that failed to resolve collapsed
tubing and casing.
B1-28 is shut-in and secured with a tubing tail plug due to tubing by inner annulus
communication.
Appendices
Table 1 Badami Well Disposition
Well
Completion
Date
Disposition
Comment
B1-01 8/19/98 Class 1 Disposal Well Completed MIT in 2006
B1-11A 3/4/98 Pre-produced injector
cased and prop fracced.
Producer 8/24/98 to present.
B1-14 5/1/98 Gas injector, cased. Injector 8/24/98 to 9/29/98.
Producer 9/30/98 to 11/29/98.
Injector 9/30/98 to present.
B1-15 7/31/98 Producer, trilateral
open hole.
Trilateral open hole dedicated
producer.
Dedicated producer.
Supported by injection from B1-14.
B1-16 6/13/98 Pre-produced injector,
cased, prop fracced.
Injector 8/24/98 to 9/25/98.
Producer 9/26/98 to 10/21/98.
Currently shut-in; will not sustain
flow.
B1-18 4/3/98 Producer, cased and
prop fracced.
Dedicated producer.
B1-21 1/6/98 Pre-produced gas
injector, fracced, no
proppant. Converted
back to producer.
Producer 8/24/98 to 11/30/98.
Injector 12/01/98 to Aug 2003.
Producer Oct 2005 to present.
B1-25 11/20/98 Producer, unilateral
open hole.
Unilateral open hole dedicated
producer.
Suspended/secured/safed out due to
collapsed tubing and casing.
B1-28 10/20/98 Producer, trilateral
open hole.
Trilateral open hole dedicated
producer.
Currently shut-in and secured with
a tubing tail plug due to tubing by
inner annulus communication.
B1-36 5/23/99 Producer. Dedicated producer
As of December 31, 2006
Table 2 Badami Production/Injection - Surface Units
Table 3 Badami Production/Injection - Reservoir Units
Table 4 2006 Badami Pressure Monitoring Summary
W e ll Da te Ope ra ti on Com m e nt
B1-18 7/1/06 Press ure Static Pres sure at datum: 1958 ps i
2005 Badami Pressure Monitoring Summary
Table 5 Badami Well Testing Frequency Summary
Well
Number of Well
Tests in 2003
Number of Well
Tests in 2004
Number of Well
Tests in 2005
Number of Well
Tests in 2006
B1-11A 11 0 20 84
B1-15 3 0 15 43
B1-16 0 0 0 1
B1-18 1 0 18 64
B1-21 0 0 22 35
B1-25 8 0 0 0
B1-28 9 0 0 0
B1-36 7 0 25 90
Figure 1 Field Production History Badami Field Oil Production02,0004,0006,0008,00010,00012,00014,00016,00018,0008/24/988/24/998/23/008/23/018/23/028/23/038/22/048/22/058/22/06Daily Oil Volume (bopd)
Figure 2 Field Gas Disposition Histories Badami Field Gas Disposition05,00010,00015,00020,00025,00030,00035,0008/24/988/24/998/23/008/23/018/23/028/23/038/22/048/22/058/22/06Daily Gas Volumes (mscfpd)InjectionFuelFlareEndicott (Imported)
Figure 3 Well Test History B1-11A
Figure 4 Well Test History B1-15
Figure 5 Well Test History B1-16
Figure 6 Well Test History B1-18
Figure 7 Well Test History B1-21
Figure 8 Well Test History B1-36
Figure 9 Gas Injector Performance History