Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2007 Milne Point UnitZE March 31, 2008 Mr. John Norman Alaska Oil and Gas Conservation Commission 333 W. 7h Ave # 100 Anchorage, AK 99501-3539 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 0 (907) 561-5111 RE: Milne Point Unit Waterflood Report, Surveillance Report, and Shut in Well Report Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool Dear Commissioner Norman: In accordance with the requirements of Conservation Orders 205 and 432B (Kuparuk River Oil Pool), Conservation Order 477 (Schrader Bluff Oil Pool), and Conservation Order 423 (Sag River Oil Pool), the Operator of the Milne Point Unit hereby submits the consolidated Waterflood Surveillance Report for the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool, and Sag River Oil Pool. This report covers the time period January 1 through December 31, 2007. This report also contains a list of the wells at Milne Point that have been shut in for 365 days in 2007. This information is being provided in compliance with AOGCC regulation, 20 AAC 25.115 (Shut-in Wells). Due to the possible future plans for these wells it is our intent to leave the vast majority of them shut-in at this time and not to proceed with suspension or abandonment with the exception of those for which there is no future use. The Operator of the Milne Point Unit reserves the right to alter the content of the analyses contained in this report at any time, based on the most recent surveillance information. Sincerely, Mark C. Weggeland Resource Manager Milne Point Unit BP Exploration (Alaska), Inc. Milne Point Unit Waterflood and Reservoir Surveillance Report for Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool January through December, 2007 Issued: March 31, 2008 Sections and Exhibits Introduction Overview Section 1: General Information Exhibits 1A —1E Kuparuk River Oil Pool Section 2: Kuparuk River Oil Pool Exhibits 2A - 2G Schrader Bluff Oil Pool Section 3: Schrader Bluff Oil Pool Exhibits 3A — 3I Sag River Oil Pool Section 4: Sag River Oil Pool Exhibits 4A — 4G Production/Injection Surveillance Logs Section 5: Production/Injection Well Surveillance Exhibits 5A Shut in Well Exhibit Section 6: Shut in Well Status 6A 1 2 9 0 5 6 ANNUAL RESERVOIR SURVEILLANCE REPORTS MILNE POINT UNIT KUPARUK RIVER OIL POOL SCHRADER BLUFF OIL POOL SAG RIVER OIL POOL JANUARY - DECEMBER 2007 Introduction As required by Conservation Order 205 for the Kuparuk River Oil Pool, approved October 4, 1984, Conservation Order 477, approved August 23, 2002 for the Schrader Bluff Oil Pool, and Conservation Order 423 for the Sag River Oil Pool, approved May 6, 1998, this report provides a consolidated summary of surveillance activities within the Milne Point Unit. The report includes surveillance data associated with waterflood projects and development activities. The time period covered is January through December 2007. Order 205 for the Kuparuk River Oil Pool requires the Operator to submit the following for the previous calendar year: • A tabulation of reservoir pressure and injection pressure data on wells in the waterflood permit area. • A tabulation of all production logs, injection well surveys, and injection well performance data. • Produced fluid volumes (oil, gas, and water) and injected fluid volumes reported by month and on a cumulative basis. Order 477 for the Schrader Bluff Oil Pool requires the Operator to submit the following for the previous calendar year: • Progress of enhanced recovery project(s) implementation and reservoir management summary. • Voidage balance by month of produced fluids (oil, gas, and water) and injected fluids and cumulative status for each producing interval. • Summary and analysis of reservoir pressure surveys within the pool. • Results, and, where appropriate, analysis of production and injection logging surveys, tracer surveys and observation well surveys, and any other special monitoring. • Review of well testing and pool production allocation factors over the prior year. • Future development plans, • Review of Annual Plan of Operations and Development. A separate Plan of Development is sent annually by October 1. Order 423 for the Sag River Oil Pool requires the Operator to submit the following for the previous calendar year: • Progress of enhanced recovery project implementation and reservoir management summary including engineering and geotechnical parameters. • Voidage balance by month of produced fluids and injected fluids and cumulative status. • Analysis of reservoir pressure within the pool. • Results, and, where appropriate, analysis of production logging surveys, tracer surveys and observation well surveys. • Review of pool allocation factors over the prior year. • Future development plans. Each of the three producing reservoirs is reported in a separate section. Section 1 General Information List of Exhibits Milne Point Unit Schematic Overview Statistical Summary Kuparuk Pressure Map Schrader Bluff Pressure Map 1-A 1-C 1-D Sag River Pressure Map 1-E Overview Exhibit 1-A shows the participating areas of the three waterflood projects in the Milne Point Unit: the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool and the Sag River Oil Pool. A miscible water-altemating-gas (MWAG) process was certified as an enhanced oil recovery project for the Milne Point Kuparuk reservoir on September 15, 1998. The MWAG process was in effect from December 2001 to December 2002. Since December 2002, a different enhanced oil recovery method, US -WAG (water-altemating-gas injection in an under -saturated reservoir), has been in effect and will continue to be implemented in the Milne Point Kuparuk reservoir. During 2005, permitting was completed for implementation of a pilot WAG program in the Schrader Bluff. In 2006, the pilot commenced with injection into two E -pad injectors, MPE-29 and MPE- 25A. During 2007, both E pad injectors continued WAG injection with one gas slug each. Results are still being analyzed and the pilot will continue through 2008. In May 2005, injection at L pad was converted from produced water injection to lower salinity Prince Creek source water injection as a means of potentially increasing recovery. Observation of resulting production and salinity trends has shown a clear chemical response but the production response was not as conclusive. Further monitoring is ongoing. Bright Water" is a polymer additive to injection water that alters sweep patterns deep in the reservoir, intended to enhance ultimate recovery. A Bright Water trial was pumped in MPB- 12i in 2004 and monitoring of this injection pattern continued through 2005-06. The monitoring shows small but positive results. A dye tracer was pumped in MPE-23i in preparation for further treatments and monitoring of the offsets continues. Bright WaterTm was pumped in summer 2007 in MPE-23i and MPF -62i. Drilling activity increased slightly in 2007 from 2006 and data acquisition and analysis continued for evaluating future development candidates. In the Schrader Bluff, two producers were redrilled or sidetracked (MPS -01A and MPH -19), as well as one grassroots injector (MPH -17) and one sidetracked injector (MPS -33A). Two wells, Liviano and Pesado, were drilled to appraise the northwest region of the Schrader Bluff reservoir, during which pressures, fluid samples, and core were collected. One grassroots injector was drilled (MPF -99) in the Kuparuk reservoir as a WAG injector and core was obtained for study. Exhibit 1-B provides well count, production, and injection statistics for the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool and the Sag River Oil Pool. During the report period of January through December 2007, field production averaged 33.5 MBOD, 19.5 MMSCFD (GOR 580 SCF/STB) and 68.6 MBWD (water cut 67%). Waterflood injection during this period averaged 84.9 MBWD with 10.2 MMSCFD of gas injection. The overall field voidage replacement ratio was 0.80 RB/RB for 2007. As of December 31, 2007, cumulative water injection in the Kuparuk River Oil Pool was 360.0 MMSTB, while cumulative gas injection was 91.4 BSCF. Cumulative production was 206.4 MMSTB oil, 108.7 BSCF gas, and 190.9 MMSTB water. From fust production to December 31, 2007, cumulative production exceeded injection by 34.0 MMRB. As of December 31, 2007, cumulative water injection in the Schrader Bluff Oil Pool was 88.5 MMSTB and cumulative gas injection in the Schrader Bluff Oil Pool was 125 MMSCF. Cumulative production was 53.2 MMSTB oil, 34.1 BSCF gas, and 29.5 MMSTB water. From first production to December 31, 2007, cumulative production has exceeded injection by 32.4 MMRB. Cumulative water injection in the Sag River Oil Pool from startup through December 2007 was 1.3 MMSTB, while cumulative gas injection was 324 MMSCF. Cumulative production was 1.8 MMSTB oil, 1.9 BSCF gas, and 1.7 MMSTB water. As of December 31, 2007, cumulative production exceeded injection by 3.4 MMRB. Exhibits 1-C, 1-D, and 1-E provide an aerial view of reservoir pressures throughout the Kuparuk River, the Schrader Bluff, and the Sag River Oil Pools. �d Exhibit 1-B Milne Point Unit 2007 OVERVIEW STATISTICAL SUMMARY WELL STATISTICS As of 12/31/2006 Producers Injectors - WAG - Water Only - Gas Only As of 12/31/2007 Producers Injectors - WAG - Water Only - Gas Only Production Well Status in 2007 - Newly Drilled - Sidetracked or Redrilled Gas Injection Well Status in 2007 - Newly Drilled - Sidetracked or Redrilled WAG Injection Well Status in 2007 - Newly Drilled - Sidetracked or Redrilled Water Injection Well Status in 2007 - Newly Drilled - Sidetracked or Redrilled Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool 90 53 1 56 43 1 35 2 0 19 41 1 2 0 0 90 54 1 55 44 1 37 2 0 16 42 1 2 0 0 0 0 0 0 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 1 0 NOTES: (1) Well count reflects ONLY those wells that were operating at the time of interest. Exhibit 1-131 (continued) Milne Point Unit 2007 OVERVIEW STATISTICAL SUMMARY PRODUCTION/INJECTION STATISTICS Cumulative Production Through 12/31/2007 Oil (MSTB) Gas (MMSCF) Water (MSTB) Cumulative Injection Through 12/31/2007 Water (MSTB) Gas (MMSCF) Cumulative Voidage Balance Through 12/31/2007 Cum. Production (MRB) Cum. Injection (MRB) Over/Under (MRB) AVERAGE RATE 2007 Production: Oil (MBD) Gas (MMSCFD) Water (MBD) Injection: Water (MBD) Gas (MMSCFD) AVERAGE OF PRESSURES OBTAINED IN 2007 (psig) December 2007 Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool 206,407 53,245 1,831 108,735 34,066 1,896 190,860 29,534 1,694 360,016 88,475 1,325 91,439 125 324 483,831 121,981 5,060 449,824 89,544 1,664 -34,007 -32,437 -3,396 22.2 11.2 0.19 14.0 5.3 0.15 53.0 15.6 0.04 58.0 26.3 0.47 10.0 0.2 0.00 3,033 1,655 2,772 b P 2 .00W, Exhibit 1-C Kuparuk Formation Pressure Map, Milne Point Field, Dec 2007 -..._..._..._... ..a I 255 283 r• 28S MPPP , ,- -. Note: This map includes most recent pressure for each MPFJa MPF_3. T nn. �•••_+ X91 n$ . � ,;Pv, r.�19 ��:, 257 well and may have been obtained prior to 2007. 215 195 205 3 200 185 160 162 135 390 165 107 w MPF10Mf MPF1859 B ,®..._ s ,� FS . MPFO>A ••_ ••� piu•� MSPF� 7.'. �A •�. �S�� lM�,FUV •+w� •"s'a'.. • ••L2_2 . oe f MPce l� x""`PZ71�$ _• WFM • 1 MPFM 9VFIMPFd9M� / $ee ,��, $IP • $19 9991 ! /- �'� E@Ltl 1� WDPI S 1 99!F&a • • 999 r' • 9wPo1*9mn MVW9 W!Ld 99x;9 91ncs • '0S° f 270 �' 1me • ,c1v' m" 2 35, jMFF:B) • • 9aLU9 �, 230X ..®.,.a,� 70, MPFL9 MFV,9 M9499 •w�.m a ,$, 9wFW J 261e" Mw,n • J •320 9 MPw • Mw,v zu M9Pa9 9,v • 99, a9 � 9,w 1. • 999 i 575 99!59 • Mqy� M 9 j • f/ � • 9RL] � m9 em�8o ; MP�9,/ Mw,9 232 2['il vas - • �•MPF9F- • im, Meca.9 , 212 Mi 310. !1PF9p .321 _,$MPcpgscu •.Mosso 30$5; MPL9,A un 9 , 322E° 325 �21 1 W ovvms..vS MPW9 , • += 312 �� � wyljel . - • M! • j MPS, 332' ■ 335'/ sc271 Kuparuk Pressure Contours ! 317; 342 ®1,000 - 1,500 • �, • MPyn 331 v� Mu+v m/ea 78 ®1,500 - 2,000 a e 3y45 l •:�...m,..._.•.�,.. 330 34.1. 02,000 - 2,500 1 $•10 350 7 505 ® 2,500 - 3,000 520 1 340 ® 3,000 - 3,500 p 3,500 - 4,000 1 510 360 375 4,000 - 4,500 530 ! 400 F14,500 - 5,000 1 4_..._..._..._ ._..._ ._... ...� 535 F1 5,000 - 5,500 1 ❑ 5,500 - 6,000 405 , INJ 410 1 370 0 0.5 1 2 3 4 I • PROD Miles 1 j 215 195 205 3 200 185 160 162 135 390 165 107 by Exhibit 1-D Schrader Bluff Formation Pressure Map Milne Point Unit, Dec 2007 MPLJ7A 1760 MPL95 -' • 1590 18 8Q — MPC -41 MPG -15 0 531 1]]1 MPJ -15 2764 1942 MPG 10 MPG 13 •/ /21]1 2�1 MPE5 < i MPJ -24 1516 MPJ 20A -' -' 1066 1 MPJ 17 T MPJ 23 2250 2135 2007 SBF Pressure MPH -10_ 1483 MPH17MPH-m—MP. M 1 rim 1532 ' MPJ -08A 1381 MPGMPG-0BA MPGL7 `'�'-1 y933 - 860 10]22 - 1946 -MPG43A ' ♦ MPG-1fi MPG -19 MPJ 2224 MPG -11 1918 o BpSMPJU2 2004 'MPG -01 1045 2191r MPI -119' 'MPG -17554/ ./ 1855 MPG4)5 MPG -18 i MPE-28 .1169 1 01,800 2,000 MPH -10_ 1483 MPH17MPH-m—MP. M 1 rim 1532 ' MPJ -26 88 - 93 99 • 860 •i ' ♦ MPG-1fi 02,000- 2,200 , -- MizG F o � 'MPG -01 1045 ,800' 1,000 ! Mn09 MPJ.O .' 883 MPN • 12,400 - 2,600 i M156 3 1]01 J e 1085 d d� 'JX 12,600 - 2,600 i l MPI-ae __ ' MPH -13A 1285 11,000 -1,200 1305 r MPS 24' A NJ Notes: This map includes most recent pressure for each well 1805 MPI -04A MPI-02LS. , 1]]8 f and may have been obtained prior to 2007. ! MPI -12' _ MPS3 s9 A 992 2135 MZ MPG -09 01,200 -1,400 I • 1W +v a MPH 14 1517 1 1623 .MPI -17 '-1183. MPI C I MPI -10 MPH -16 -05 133fi� 1940 01,400 - 1,600202] }J MP196 MPH-1: MPI 11 'Mp1.06 2427MPK15 PI A1735 1880 I 876 1552 1 67 01,600 -1 ,600 • •61590 i MPE-28 .1169 1 01,800 2,000 MPH -10_ 1483 MPH17MPH-m—MP. M 1 rim 1532 ' ' - • 860 •i MP&291256 02,000- 2,200 , MPH -091770 02,200 - 2,400 MP535 • 1204 MPS -21 • • MP53 1 5 MPS -28 172] MPG. MPH07A 132 , • 12,400 - 2,600 i 1271 MPS -02 . 1660 d� 'JX 12,600 - 2,600 _MPS 15 2478 1� __ 1305 r MPS 24' A NJ Notes: This map includes most recent pressure for each well •MPS31 635 1]]8 f and may have been obtained prior to 2007. . MPS3 s9 A • PROD Not all wells penetrate all sands, many are only in "N" sands or "O" sands j 0 0.5 1 2 3 4 Miles 1613 MPS 25 MPS -2 1429 214. 17 4 i M 7...` MP 202>27 , MPE-12 MPEd1 P31 M 1655 1 , 1624 1655 MPE-20A MPS -32 1198 MPS -321233 MPE-15 i 1476 F --MPG 25A / 2352 � 1 MPE-24A 1143 MPS -19A MP5-07SS 1451 6 S i MP5-01A 'MPS 177] 1 12366 • M 5 7 59] M1035 MP1825 1035 d' MPS -03 1825 S 17i fi] MPS 140 X -:1 -05 • I• ta3a MPS-10ASS- 1536 66 MP&11LS 4 1]65 141355 141410 i7t by 40, 2 « 54e Exhibit 1-E River Formation Pressure Map Milne Point Field, Dec 2007 • • a', y 295 • 285 if AIPF 04 WF -64 • • MP .17 1•PI APF.a6 W -M MPF -30 260 2SI '� \PFCi • �� 292 • WF•66 282 KVF.70 MPF -73A' IF -10 297' • MP063 r 4871 A, WF -W/ W.0 IiF37271iA•426 v n • • A•i-6G 262 W614 WF•104 uFF.26 mllp 3- 2, 1IF6119 1rL.16 1876 230 IF NPF1 270 • W411 `j • 261 • • 1.•41a a,/ I.P1,07 MPFW W64 4 �� � • Sag River Pressure Contours High: 4578.39 Low: 1888.28 l INJ • PROD 0 250 500 1,000 1,500 Feet Section 2 Kuparuk River Oil Pool List of Exhibits Waterflood Pattern Map 2-A Total Reservoir Production Plot 2-B Total Reservoir Injection Plot 2-C Pertinent Data Summary 2-D Reservoir Voidage Balance 2-E Static Pressure Data 2-F Injection Rate & Pressure Data By Well 2-G Kuparuk River Oil Pool Waterflood Project Summary The Kuparuk River Oil Pool waterflood area is shown in Exhibit 2-A. The locations of production and injection well pairings are shown to give a general visualization of waterflood polygons, but do not show estimated waterflood sweep. There were 90 producing wells and 55 injection wells that contributed to production and injection during 2007. Exhibit 2-13 shows a production plot for the Kuparuk River reservoir covering the entire project history through December 2007. The Kupamk River Oil Pool oil production averaged 22.2 MSTBD for 2007 compared to 23.3 MSTBD in 2006. This represents an oil production decrease of 4.7% in 2007. Water production averaged 53.0 MBWD in 2007 and 47.6 MBWD in 2006, an increase of 11.3%. Cumulative production since waterflood startup through the end of 2007 is 206.4 MMSTB of oil, 108.7 BSCF gas, and 190.9 MMSTB of water. Exhibit 2-C shows an injection plot for the Kuparuk River reservoir covering the entire project history through December 2007. Water and gas injection rates averaged 58.0 MBWD and 10.0 MMSCFD for 2007. Injection rates in 2006 averaged 65.4 MBWD and 15.5 MMSCFD. This represents a decrease in water injection of 19.0% and a decrease in gas injection of 35.5%. Cumulative water injection since waterflood startup through the end of 2007 is 360.0 MMSTB and cumulative gas injection is 91.4 BSCF. Average water cut increased from 67.2% in 2006 to 70.5% in 2007. Water cut continues to increase in the Kuparuk River reservoir as the waterflood patterns mature. GOR decreased from 726 SCF/STB in 2006 to 630 SCF/STB in 2007. The GOR has decreased primarily due to less gas cycling due to lower field gas production in 2007. Exhibit 2-D presents a summary of the pertinent production information for the Kuparuk River Oil Pool waterflood. Exhibit 2-E shows a monthly breakdown of production and injection data for the report period. This data shows that the voidage replacement ratio averaged 0.78 RB/RB in 2007. The cumulative VRR for the reservoir is 0.93 RB/RB. The reservoir voidage calculation does not include the water influx from the aquifer, so the under -injection volume is overstated in this report. Another reason for a lower VRR in 2007 is due to managed injection to reduce water cycling and manage reservoir pressures for remedial work on wells. Exhibit 2-F presents the reservoir pressure data taken during 2007 for the Kuparuk River wells. The average of the pressures obtained in 2007 was 3033 psi (note that this is not a volumetric average reservoir pressure). This change is an increase from the average of the pressures obtained in 2006 of 2898 psi. In 2007, 150 pressures were obtained in 103 wells, 78 active producers and 23 active injectors and 2 long term shut in wells. This equates to gathering pressure data in 87% of active producers and 42% of active injectors. Exhibit 2-G provides a monthly summary of individual well injection rate and injection pressure data for all of the Kuparuk River Oil Pool injectors. by E3 Exhibit 2-A Kuparuk Waterflood Pattern Map Milne Point Field, March 2008 �•• •••••y Kuparuk Well Status -• Oil Producer Shut -In MPF' 255 � MPF=92 288 PF17 xi Abandoned aIi- Oil Producer Submersible t 295 •/ ,,,,• Gas Injector Injecting +- Oil Suspended ••r MAF42/ -`2SMA 2S Miscible Injector Shut -In • Oil Well MP -BBA 25.1 Mp .90 M, .78 !f Not Yet Completed. Plugged Beck For Redrill MPF -29 MP9.74 F NuIVUnlmown Suspended MPF -50 M p-280 PF -lis 240 MPF -i0 / MP . 252b / P. 252 1 • Oil Producer Flowing l Water Injector lnjec9ng MP p,. MP 290 P282 MPL-25 �- Oil Producer Gas Lm Water Injector Shut -In 1 MAF• MP' M 6989 M/F/�19 225 'M' Oil Producer Hydraulic Pump ..�..pp Milne Point Unit PF -2 271 M/� 1 Z Z 24 MPL-1 P 21 MPL 29 •� li Q Kuparuk Hydraulic Units ••� /AP.FA1 MPF -14 PF"� MPF�7A MPL-11 M MPC 21 ~' 0 0.5 1 2 3 4 _ MPL-33 MPL-0 215 zn, ..e�.miPili•..,'� /M_.;13 Me�-4>3 %1235 _ 1 Miles 51 M L'-305 MPLI,/ r^ / MBCr15 200/ MPB-1 r•� 165 'k F322 325'Pf / / ' 165 M B. -30.03 MPC+OSA M�o1 MPG7270g. PG18 /g� Y3o-45 . h-39 312. ��MPC-40�+!�I_�"nnPc-1 I7'Y147PB-17 162 311 K -2a I \ _� 505 7 9 r�520 / 3N-15 t 3K-22 '23 .^ 340 /f 3K -02y` wsAK-t���ao QK-20 3K-27 • 1R-33 3K-34 9K-16 3K-17 3K-35,./ " '�- f3K�•15iI1�'- /' 1R-34 OB 3(: -'OB • �p_ I I .31 3G05i- 1R3C•07-3 I- 410 1R-35 30-03 3C -G 3C-09 3C-10 X y, 1R-21 IFI - 120 1R-2 3 036'04A 11R-17 1R -1$A 405 135 390 moil I415 �i a a o m 10000 00 H N N m m f N 2 1000 2 " `. 0 0 o 0 0. a d 100 O 3 10 I rr pd, m 80 c J Oc 70 60 0 A. 50 a 40 5 U w 30 m 3 20 10 0 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 Exhibit 2-B BP ALASKA - Milne Point Unit Kuparuk Reservoir, Total Production 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Oil Prod Cum KUP — Oil Prod Rate KUP —Water Prod Cum KUI y Water Prod Rate KUP —Gas Prod Cum KUP Gas Prod Rate KUP 1000000 100000 100 10 1 0.9 0.8 0.7 Water Cut % KUP_ 4 Producers Online ?F Gas/Oil Ratio KUP 0.4 C7 0.3 0.2 0.1 0 Exhibit 2-C BP ALASKA - Milne Point Unit Kuparuk Reservoir, Injection r w,r...r a 100000 O C 2 E; 1000 c d m 3 100 10 4! i I i I I 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 623 45 40 d 35 c c 30 O m oo 25 m 20 `o x 15 10 0 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 ®Water Inj Cum KUP —= Water Inj Rate KUP —Total Gas Inj Cum KUF X Lean Gas Inj Rate KUP —l—Solvent Inj Rate KUP rrrrrrr 1000000y c LL LL W N rC 100000 u U N Nr � c 10000 _`o n v ?' d c c .. — c 1000 0 u N 100 ® Water Injectors Online 0 Gas Injectors OnLine MI Injectors Online Exhibit 2-D Milne Point Unit - Kuparuk River Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2007 WATERFLOOD START-UP DATE: November 1985 Prior to Waterflood Start -Up: Oil (MSTB) 0 Gas (MMSCF) 0 Water (MSTB) 0 Since Waterflood Start -Up: Oil (MSTB) 206,407 Gas (MMSCF) 108,735 Water (MSTB) 190,860 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 360,016 Injection Gas (MMSCF) 91,439 Lean Gas (MMSCF) 83,017 Solvent (MMSCF) 8,422 AVERAGE OF PRESSURES OBTAINED IN 2007 @ 7.000' TVD as December, 2007 Pressure (psig) 3,033 WELL COUNT (Wells in Operation)* Production Wells 90 WAG Injection 37 Water Only Injection 16 Gas Only Injection 2 Notes: * Reflects ONLY operating wells. Exhibit 2-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Kuparuk River Oil Pool January - December 2007 Production: Injection: Oil Water Gas Reservoir Water Gas Voidage Voidage Voidage Month Prod Rate Prod Rate Prod Rate Voidage Inj Rate Inj Rate Replacement Replacement Balance (sib/day) (stb/day) (mscf/day) (rbbVday) (stb/day) (mscf/day) (rbbVday) Ratio (rbbVday) 1/31/2007 23634 52399 15904 89,590 63750 9172 73,172 0.82 -16,416 2/28/2007 22817 50691 15107 86,371 57142 8450 65,799 0.76 -20,572 3/31/2007 20594 50534 12240 81,521 55942 7099 63,335 0.78 -18,187 4/30/2007 19521 39890 8061 65,874 57408 5713 63,543 0.96 -2,332 5/31/2007 23866 45236 12316 79,221 57788 10058 67,939 0.86 -11,282 6/30/2007 24999 59868 14827 97,431 60677 11403 72,113 0.74 -25,319 7/31/2007 24661 61641 17148 101,064 62032 14457 76,307 0.76 -24,757 8/31/2007 17148 45059 11103 71,747 36360 8599 44,843 0.63 -26,905 9/30/2007 22267 49413 11691 81,415 57457 9226 66,835 0.82 -14,580 10/31/2007 23514 55916 15977 93,118 60677 11244 71,966 0.77 -21,151 11/30/2007 22321 60097 17088 97,290 64241 12859 77,075 0.79 -20,215 12/31/2007 20887 64905 16139 99,976 63099 11467 74,631 0.75 -25,345 Average: 2007 22,186 52,971 13,967 87,052 58,048 9,979 68,130 0.78 -18,922 Cumulative: mstb mstb mmscf mrb mstb mmscf mrb mrb 31 -Dec -07 206,407 190,860 108,735 483,831 360,016 91,439 449,824 0.93 -34,007 Blue text indicates metered rates. Red tent indicates calculated numbers. Exhibit 2-F Static Pressure Data Kuparuk River Oil Pool STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RESERVOIR PRESSURE REPORT 1. Operator: BPXA 12. Address: 900 E. Benson Blvd Anchorage. Alaska 99SOB4254 3. Unit or Lease Name: Milne Point 4. Flekl and Pool: Kuparuk River Pool 15. Datum Reference: 700P SS B. Oil Gravity: API - 23 7. Gas Gram : Air = 1.0 8. Well Name and Number: 9. API Number 50-XXX-XXXXX-XX-XX 10. Oil (0) or Gas (G) 11. AOGCC Pool Godo 12. Final Test Date 13. Shut -In Time, Hours 14. Press. Surv. Type (see Instructions for codes) 15. B.H. Temp. 16. Depth Tool 17. Final TVDss Observed Pressure at Tool Depth IB. Datum TVDas (input) 19. Pressure Gradient, psVft. 20. Pressure at Datum(oal) Comments Zone MPB-04A 50-50049207-48.01 PROD 525100 8/30107 235 SBHP 172 6800 2,335 7,000 0.335 2,346 B+C MPB-09 50-500-29212-97-00 PROD 525100 5/1/07 1628 SBHP 172 6850 2,265 7,000 0.415 2,903 B+C MPB-10 50.500.29212.80-00 PROD 525100 12/22/07 22995 SBHP 172 6870 3,862 7,000 0.428 3,918 B+C MPB-15 50-500-29213-74-00 PROD 525100 2/25/07 82 SBHP 173 6950 2,276 7,000 0.399 2,296 B+C MPB-15 50.500.29213.74.00 PROD 525100 4/29/07 1603 SBHP 173 6950 2,582 7,000 0.409 2,602 B+C MPB-16 50-500-29213-84-00 PROD 525100 4/30/07 1011 SBHP 172 6880 2,782 7,000 0.439 2,835 C MPB-21 50.600-29215.35.00 PROD 525100 4/30/07 1663 SBHP 175 6974 2,500 7,000 0.338 2,509 B+C MPB-22 50-500-29215-09-00 PROD 525100 5/24107 2160 SBHP 178 6841 3,058 7,000 0.455 3,130 B+C MPB-25 50-500-29228.41-00 INJ 525100 4/9/07 1584 PFO 3,929 7,000 0.564 3,950 B+C MPC -01 50-500-29206-63-00 PROD 525100 12/22/07 696 PP 6736 2,215 7,000 0.432 2,329 A+C MPC -03 50-500-29207-86-00 PROD 525100 5/2/07 1657 SBHP 173 7000 1,727 7,000 0.247 1,727 A+B+C MPC -04 50-500-29208-01.00 PROD 525100 5/2/07 1666 SBHP 176 7000 3,314 7,000 0.430 3,314 C MPC -05A 50-500-29212-44-01 PROD 525100 2/26107 101 SBHP 178 7000 3,392 17,000 0.333 3,392 B+C MPC-O5A 50-500-29212-44-01 PROD 525100 5/3/07 1695 SBHP 174 6950 3,639 7,000 0.340 3,666 B+C MPC -06 5G-500-29212-57-00 INJ 1525100 2/12107 1384 FL 1 1,175 7,000 0.420 4,039 1 A+C MPC -07 50-500-29212-66-00 PROD 525100 2/28107 144 SBHP 175 7000 2,591 7,000 0.364 2,591 A MPC -07 50.50049212.66.00 PROD 525100 5/2/07 1656 SBHP 175 7000 3,124 7,000 0.364 3,124 A MPC -08 50.500.29212.77.00 INJ 525100 7/10107 2232 SBHP 120 6900 4,485 7,000 0.441 4,529 A+B+C MPC -08 5G-500-29212-77-00 INJ 525100 8/29107 3432 SBHP 123 6900 4,379 7,000 0.440 4,423 A+B+C MPC -09 50-500-29212-99-00 PROD 525100 5/1/07 1650 SBHP 176 7050 3,599 7,000 0.281 3,585 A+B+C MPC -10 50-500.29212-78-00 INJ 525100 8/4/07 293 SBHP 120 7000 5,503 7,000 0.446 5,503 A+B+C MPC -10 50-500-29212-78-00 INJ 525100 8/29/07 912 SBHP 116 17200 5,219 7,000 10.431 5,133 A+B+C MPC -13 50-500-29213-28-00 PROD 525100 8/27/07 113 SBHP 181 6651 1,737 7,000 0.436 1,889 A+B+C MPC -13 50-500.29213.2&00 PROD 525100 9/1/07 600 PP 6695 12,339 7,000 0.430 2,470 A+B+C MPC -14 50-500-29213-4400 PROD 1525100 6/10/07 11656 PP 6743 3,136 7,000 0.431 3,247 1 A+B+C MPC -15 50-500-29213-58-00 INJ 525100 3/10/07 715 SBHP 118 7000 3,689 7,000 0.457 3,689 A+B+C MPC -15 50.500.29213.58.00 INJ 525100 11/28/07 7029 SBHP 125 6966 2,741 7,000 0.171 2,747 Gas Injector A+B+C MPC -19 50-500-29215-0400 INJ 525100 8/25/07 4728 SBHP 154 7000 3,419 7,000 0.110 3,419 Gas Inleclor A+B+C MPC -21 50-500-29224-86-00 PROD 525100 5/3/07 1688 SBHP 170 6985 1,746 7,000 0.430 1,753 Pressure still building A+C MPC -22A 50.500-29224.89.01 PROD 525100 5/2/07 1672 SBHP 175 7000 3,524 7,000 0.430 3,524 A MPC -24 50-500-29230-20-00 PROD 525100 3128107 840 PBU 5420 7,000 0.456 3,193 A+C MPC -24 50.500.29230.20.00 PROD 525100 5/1/07 840 PP 16077 2,228 7,000 10.430 2,625 A+C MPC -24 50-500-29230-20-00 PROD 525100 8/29/07 150 SBHP 181 6029 1,511 7,000 0.406 1,905 A+C MPC -24 50-500-29230-20-00 PROD 525100 9/15107 552 IPP 6077 2,050 7,000 0.430 2,447 A+C MPC -26 50-500-29226-3400 PROD 1525100 8/30107 168 SBHP 157 6469 2,134 7,000 0.429 2,362 1 A MPC -28A 50-500-29226-48-01 INJ 525100 8/30107 1848 SBHP 162 7000 2,493 7,000 0.380 2,493 A+C MPC -36 50-500-29228-53-00 INJ 525100 12/12/07 72 SBHP 79 2694 3,647 7,000 0.435 5,522 A+B+C MPC -36 50.500.29228.53.00 INJ 525100 12/25/07 384 SBHP 105 5101 4,487 7,000 0.444 5,330 A+B+C MPC -42 50-500-29231-96-00 INJ 525100 3/3107 528 SBHP 156 7000 4,885 7,000 0.420 4,885 A MPC -43 50-500-29232-00-00 PROD 525100 5/3/07 648 PP 6420 2,709 7,000 0.430 2 958 A MPC -43 50.500.29232-00-00 PROD 525100 8/31107 216 PP 6420 2,145 7,000 0.430 2,394 A MPE-03 50-500-29219-16-00 INJ 525100 8/1 B/07 26 SBHP 1138 6457 3,986 7,000 0.201 4,095 A+B+C MPE-04 50-500-29219-97-00 PROD 525100 8/28/07 227 SBHP 180 6716 1,511 7,000 0.366 1,615 B+C Exhibit 2-F Static Pressure Data Kuparuk River Oil Pool 8. Well Name and Number: 9. API Number 50-XXX-XXXXX-XX-XX 10. Oil (0) or Gas (G) 11. AOGCC Pool Code 12. Final Test Date 13. Shut -In Time, Hours 14. Press. Sun,. Type (see Instructions for codes) 15. B.H. Temp. 16. Depth Tool 17. Final TVDss Observed Pressure at Tool Depth 18. Datum TVDss (input) 19. Pressure Gradient, psVft. 20. Comments Pressure at Datum(caq Zone MPE-05 50-500-29220-58-00 INJ 525100 12/18/07 275 SBHP 137 7148 3,838 7,000 0.426 3,775 B MPE-06 50.500-29221-54-00 PROD 525100 8/28/07 192 SBHP 180 6729 2,605 7,000 0.411 2,716 B+C MPE-08 50-500-29221-56-00 PROD 525100 5/14/07 1776 PBU 6715 2,795 7,000 0.428 2,917 B+C MPE-09 50-500-29225-13-00 PROD 525100 8/29/07 222 SBHP 176 6709 2,372 7,000 0.463 2,507 B+C MPE-10 50-500-29225-21.00 PROD 525100 3/5/07 2534 SBHP 170 6696 2,717 7,000 0.470 2,860 C MPE-11 50-500-29225-41-00 PROD 526100 1/19/07 3185 SBHP 172 6706 3,372 7,000 0.420 3,495 C MPE-11 50.50049225.41-00 PROD 525100 2/8/07 3668 SBHP 173 6708 3,379 7,000 0.424 3,503 C MPE-11 50-500-29225-41-00 PROD 525100 7/16/07 1344 PP 6693 3,435 7,000 0.429 3,567 C MPE-18 50-500.29227.48-00 PROD 525100 7/28/07 3543 SBHP 180 6812 3,807 7,000 0.440 3,890 B+C MPE-22 50-500-29225-67-00 PROD 525100 11/11/07 2277 SBHP 171 6706 2,708 7,000 0.377 2,819 B+C MPE-23 50-500-29225-70-00 INJ 525100 1/22/07 1200 PFO 2,839 7,000 0.402 2,816 B+C MPE-23 50.500-29225-70-00 INJ 525100 4/12/07 6 SBHP 122 7047 2,992 7,000 0.400 2,973 B+C MPF -05 50-500-29227-62-00 PROD 525100 8/31/07 195 PP 6821 3,343 7,000 0.437 3,421 A MPF -06 50-500-2922639-00 PROD 525100 8/28/O7 144 SBHP 175 6845 2,877 7,000 0.426 12,943 A MPF -09 50.500.29227-73-00 PROD 1525100 8/30/07 171 IPP 16863 12.167 7,000 0.431 2,226 A MPF -13 50-500-29225-49-00 PROD 525100 3/8/07 548 SBHP 180 6959 2,802 7,000 0.379 2,818 A MPF -14 50.500.2922636-00 PROD 525100 8/29/07 147 PP 6847 2,492 7,000 0.425 2,557 A MPF -17 50-500-2922623-00 PROD 525100 12/6/07 17038 SBHP 135 5912 2,334 7,000 0.401 2,770 A MPF -18 50.500-2922681-00 PROD 525100 8/30/07 171 PP 7012 3,075 7,000 0.419 3,070 A MPF -22 50-500-2922632-00 PROD 525100 8/29/07 147 PP 6638 2,589 7,000 0.434 2,746 A MPF -26 50-500.29225.46.00 PROD 525100 8/30/07 171 PP 6962 2,530 7,000 0.417 2,546 A MPF -25 50-500-29225-46-00 PROD 525100 10/19/07 441 SBHP 190 6968 2,689 7,000 0.416 2,702 A MPF -25 50-500-29225-46-00 PROD 525100 11!7/07 902 SBHP 187 6913 2,825 17,000 0.476 2,867 A MPF -26 50-500-29227.67-00 INJ 525100 1/25/07 1800 PFO 7,000 10.806 5,643 A MPF -29 50-500-2922688-00 PROD 525100 8/30/07 171 PP 7065 1,600 7,000 0.431 1,572 A MPF -30 50 -500 -29226 -23 -GO INJ 525100 8/4/07 305 SBHP 133 7003 5,307 7,000 0.758 5,307 A MPF -34 50-500.29228-24-00 PROD 525100 5/3/07 435 SBHP 201 7367 2,511 7,000 0.348 2,383 A MPF -34 50.500.29228-24-00 PROD 525100 8/30/07 170 PP 7486 2,384 7,000 0.432 2174 A MPF -37 50-500-29225-48-00 PROD 525100 8/30/07 170 PP 7141 2,059 7,000 0.432 1,998 A MPF -38 50-500-2922614-00 PROD 525100 8/26/07 91 SBHP 155 5404 2,129 7,000 0.415 2,791 A MPF -49 50.500.2922732.00 INJ 525100 5/19/07 847 SBHP 136 6920 4,490 7,000 0.427 4,524 A MPF -53 50-500-29225-78-00 PROD 525100 8/29/07 198 PP 6883 13,064 7,000 0.428 3,114 A+C MPF -54 50-500-29227-26-00 PROD 525100 8/30/07 170 PP 7097 2,747 7,000 0.432 2,705 A MPF -57A 50-500-29227-47-01 PROD 525100 3/21/07 454 SBHP 193 7180 4,058 7,000 10.375 3,991 1 A MPF -57A 50-500-29227-47-01 PROD 525100 4/11/07 965 ISBHP 188 7188 4,242 7,000 0.370 4,172 A MPF -57A 50.500-29227-47.01 PROD 525100 5/1/07 1446 SBHP 186 7188 4,306 7,000 0.370 4,238 A MPF -57A 50-500-29227-47-01 PROD 525100 9/17/07 851 SBHP 185 7189 3,995 7,000 0.357 3,927 A MPF -61 50-500-29225-82-00 PROD 525100 8/31/07 194 PP 6908 2,028 7,000 0.435 2,068 A+B MPF -65 50 -500 -29227 -52 -DO PROD 525100 8/29/07 146 PP 7320 1,665 7,000 0.435 1,526 A MPF -66A 50-500-29226-97-01 PROD 525100 9/5/07 642 SBHP 190 6856 2,135 7,000 0.365 2,187 A MPF -69 50.500-29225-86.00 PROD 525100 8/30/07 26 PP 6995 2,791 7,000 0.423 2,793 A+B MPF -70 50.500-29226-03-00 INJ 525100 1/11/07 408 PFO I I 7,000 0.629 4,402 A MPF -79 50-500-29228-13-00 1PROD 525100 8/30/07 170 PP 6261 3,151 7,000 0.433 3,471 A MPF -80 50 -500 -29229 -28 -DO PROD 525100 8/30/07 1170 PP 6818 3,705 7,000 10.434 3,784 A MPF -81 50-500-29229-59-00 PROD 525100 8/30/07 170 lPP 6485 2,839 7,000 0.433 3,062 A MPF -82 50.500-29229-71.00 INJ 525100 1/10/07 34902 SBHP 166 6922 3,782 7,000 0.431 3,815 A MPF -86 50-500-29230-18-00 PROD 525100 1/8/07 1915 SBHP 172 6760 1,851 7,000 0.428 1,954 A MPF -86 50.500.29230.18.00 PROD 525100 8/30/07 170 PP 6834 2,447 7,000 0.433 2,519 A MPF -87A 50-500-29231-84-01 PROD 525100 8/30/07 170 PP 7010 2,542 7,000 0.420 2,538 A MPF -90 50-500-29230-51-00 INJ 525100 4/11/07 238 SBHP 151 7051 6,015 7,000 0.442 5,992 A MPF -93 50.500.29232-66-00 PROD 525100 8/31/07 194 PP 5748 2,285 7,000 0.433 2,827 JA Exhibit 2-F Static Pressure Data Kuparuk River Oil Pool 8. Well Name and Number: 9. API Number 50-XXX.XXXXX-XX-XX 10. Oil (0) or Gas (G) 11. AOGCC Pool Code 12. Final Test Date 13. Shut -In Time, Hours 14. Press, Sum. Type (see instructions for codes) 15. B.H. Temp. 16. Depth Tool 17. Final TVDss Observed Pressure at Tool Depth 18. Datum TVDss (input) 19, Pressure Gradient, psilft. 20. Comments Pressure at Datum (Cal) Zone MPF -94 50.500.29230.40.00 PROD 525100 8/30/07 170 PP 7290 3,378 7,000 0.435 3,252 A MPF -94 50 -500 -29230 -00 -DO PROD 525100 11/26/07 98 SBHP 99 3713 1,574 7,000 0.384 2,836 A MPF -94 50-500.29230.40.00 PROD 525100 12/5/07 318 SBHP 182 7173 3,403 7,000 0.400 3,334 A MPF -99 50-500-29233-32-00 PROD 525100 6/4/07 672 SBHP 150 6478 2,975 7,000 0.447 3,208 A MPH -05 50-500.29225.72.00 PROD 525100 5/4/07 792 PP 6604 2,910 7,000 0.440 3,084 B+C MPH -05 50-500-29225-72-00 PROD 525100 6/10/07 648 PP 162 6604 2,924 7,000 0.440 3,098 B+C MPK-02 50-500-29226.75.00 PROD 525100 12/31/06 5760 PP 6889 2,429 7,000 0.434 2,477 B+C MPK-02 50-500-29226-75-00 PROD 525100 8/11/07 480 PBU 7,000 0.322 2,255 B+C MPK-02 50-500.29226.75.00 PROD 525100 8/31/07 279 PP 6889 2,056 7,000 0.434 2,104 B+C MPK•05 50-500-29226-70-00 PROD 525100 12/31/06 5760 PP 6767 2,423 7,000 0.429 2,523 B+C MPK-05 50.500-29226-70-00 PROD 525100 8/31/07 279 PP 6767 1,794 7,000 0.429 1,894 B+C MPK-06 50-500-29227-25-00 PROD 525100 6/29/07 13421 SBHP 167 6663 2,161 7,000 0.436 2,308 C MPK-06 50.500-29227.25.00 PROD 525100 12/12/07 2952 PP 6692 2,389 7,000 0.429 2,521 C MPK-09 50-500-29232-47-00 PROD 525100 12/31/06 5760 PP 6921 2,878 7,000 0.430 2,912 C MPK-09 50-500-29232-47-00 PROD 525100 8/31/07 280 PP 1 6921 12,911 7,000 10.430 2,945 1 C MPK-09 50-500-29232-47-00 PROD 525100 12/6/07 144 PP 6921 2,870 7,000 0.430 2,904 C MPK-13 50-500-29226-55-00 PROD 525100 12/31/06 5760 PP 6777 1,890 7,000 0.430 1,986 C MPK-13 50-500-29226-55-00 PROD 525100 12/12/07 2376 PP 6777 2,378 7,000 0.346 2,419 C MPK-17 50-500-29226-47-00 PROD 525100 4/6/07 11378 SBHP 165 6713 2,845 7,000 0.420 2,960 C MPK-17 50-500-29226-47.00 PROD 525100 8/3/07 14234 SBHP 163 6694 2,804 7,000 0.418 2,932 C MPK-18A 50-500-29227-33-01 INJ 525100 2/9/07 5177 SBHP 127 7153 3,064 7,000 0.452 2,995 B+C MPK-21A 50-500-29227-18-01 INJ 525100 2/9/07 5184 SBHP 161 6911 2,939 7,000 0.417 2,976 C MPK-22 50 -500 -29232 -49 -DO INJ 525100 2/10/07 5184 SBHP 160 7031 2,964 7,000 0.430 2,951 C MPK-22 50.500.29232.49-00 INJ 525100 5/30/07 7824 SBHP 164 17030 2,873 7,000 0.293 2,864 C MPK-30 50-500-29227-11-00 PROD 525100 6/27/07 105 ISBHP 177 6853 2,711 7,000 10.443 2,776 1 B+C MPK-30 50.500.29227.11.00 PROD 525100 7!7/07 312 SBHP 171 6859 2,958 7,000 10.390 3,013 B+C MPK-30 50-500-29227-11-00 PROD 525100 9/18/07 2087 SBHP 165 6859 2,981 7,000 10.430 3,044 B+C MPK-33 50-500-29227-29-00 PROD 525100 12/31/06 5760 PP 6946 1,547 7,000 0.430 1,570 B+C MPK-33 50.500-29227-29-00 PROD 525100 10/25/07 1587 PP 6946 1,494 7,000 0.430 1,517 B+C MPK-37 50-500-29226-74-00 PROD 525100 4/19/07 8355 SBHP 166 6803 2,913 7,000 0.426 2,997 C MPK-37 50-500-29226-74-00 PROD 525100 7/23/07 1113 SBHP 166 6810 3,216 7,000 0.418 3,295 C MPK-37 50.500.29226.74.00 PROD 525100 12/6/07 144 PP 6854 2,738 7,000 0.431 2,801 C MPK-38 50-500-29226-49-00 IPROD 525100 4/1/07 10344 SBHP 164 6863 2,271 7,000 0.343 2,318 B+C MPK-38 50-500-29226-49-00 PROD 525100 10/1/07 632 PP 16898 11,992 7,000 0.431 2,036 B+C MPK-43A 50.500-29227.38.01 INJ 525100 2/10/07 5216 ISBHP 147 6810 2,464 7,000 0.437 2,547 1 C MPL-01A 50-500-29210-68-01 PROD 525100 1/23/07 339 SBHP 175 6664 2,177 7,000 0.449 2,328 A3+A2 MPL-01A 50-500-29210-68-01 PROD 525100 3/26/07 1831 SBHP 170 6664 3,486 7,000 10.555 3,672 A3+A2 MPL-01A 50-500-29210.68-01 PROD 525100 7/27/07 4778 SBHP 166 6564 3,872 7,000 0.434 4,018 A3+A2 MPL•02 50.500.29219.98.00 PROD 525100 8/27/07 168 PP 6903 2,019 7,000 0.212 2,037 C+B+A3+A2+A7 MPL-03 50-500-29219-99-00 PROD 525100 2/13/07 496 SBHP 177 6810 2,372 7,000 0.365 2,441 C+B+A3+A2+A7 MPL-03 50-500-29219-99-00 PROD 525100 3/28/07 1524 SBHP 173 6812 2,582 7,000 0.600 2,695 C+B+A3+A2+A7 MPL-03 50.500.29219-99-00 PROD 525100 4/26/07 2212 SBHP 171 6809 2,670 7,000 0.364 2,740 C+B+A3+A2+A7 MPL-03 50-500-29219-99-00 PROD 525100 8/30/07 168 PP 6865 2,192 7,000 0.260 2,227 C+B+A3+A2+At MPL-06 50-500-29220-03-00 PROD 525100 7/3/07 1344 SBHP 179 16844 13,295 7,000 0.383 3,355 C+B+A3+A2+A7 MPL-06 50-500-29220-03-00 PROD 525100 8/27/07 176 IPP 6883 2,567 7,000 0.231 2,594 1 C+B+A3+A2+A7 MPL-07 50-500-29220-28-00 PROD 525100 8/24107 149 IPP 4660 3,328 7,000 0.429 4,333 C+B+A3+A2+A1 MPL-08 50-500-29220-74-00 INJ 525100 8/27107 10 ISBHP 104 7068 4,995 71000 0.424 4,966 A+B MPL-11 50.500.29223.36-00 PROD 525100 8/27/07 177 PP 6966 13,523 7,000 10.236 3,515 C+B+A3+A2+A1 MPL-11 50-500-29223-36-00 PROD 525100 12/6/07 177 PP 6966 12,632 7,000 0.206 3,625 C+B+A3+A2+A1 MPL-12 50-500-29223-34-00 PROD 525100 8/27/07 108 PP 6882 1,399 7,000 0.255 1,429 C+B+A3+A2+A7 MPL-13 50.500-29223.35.00 PROD 525100 8/29/07 164 PP 6899 1,965 7,000 0.219 1,987 C+B+A3+A2+A7 Exhibit 2-F Static Pressure Data Kuparuk River Oil Pool e. Well Name and Number: 9. API Number 10. Oil (0) or 50-xxx-xxxxx-xX-xx Gas (G) 11. AOGCC Pool Code 12. Final Test Date 13. Shut -In Time, Hours 14. Press. 15. B.H. Surv. Type Temp. (see instructions forcodes) 16. Depth Tool 17. Final TVDss Observed Pressure at Tool Depth 1a. Datum TVDss (input) 19. Pressure Gradient, psilft. 20. Comments Pressure at Datum (call Zone MPL-14 50-500-29224-79-00 PROD 525100 8/27/2007 108 PP 6938 1,553 7,000 0.113 1560 C+B+A3+A2+A1 MPL-15 50-500-29224-73.00 [NJ 525100 4/1/2007 336 PFO 5,096 7,000 0.720 5,042 B+A3+A2+A7 MPL-20 50-500-29227-90-00 PROD 525100 8/28/2007 131 SBHP 63 2733 2,789 7,000 0.248 2,789 A3+A2 MPL-25 50-500-29226-21-00 PROD 525100 8/27/2007 102 PP 7137 3,690 7,000 0.591 31609 B+A3+A2+A1 MPL-28A 50-500-29228-59-01 PROD 525100 8/30/2007 188 PP 6820 11900 7,000 0.317 1,957 Al+A2+A3 jAverage 13033 21. All tests reported herein were made in accordance with the applicable rules, regulations and Instructions of the Alaska Oil and Gas Conservation Commission. I hereby cerl Nat the foregoing is true and correct to the best of my knowledge. Signature I ' , W Tide /\,I ./l �1 Printed Name r /' Date J \ FL Fluid Level PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP Shut -In Bottom Hole Pressure Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPB-05A 1/1/2007 2369 31 H2O 27,734 895 MPB-05A 2/1/2007 2129 28 H2O 21,875 781 MPB-05A 3/1/2007 2250 31 H2O 34,328 1107 MPB-05A 4/1/2007 2505 30 H2O 40,793 1360 MPB-05A 5/1/2007 2392 31 H2O 34,480 1112 MPB-05A 6/1/2007 2404 30 H2O 34,710 1157 MPB-05A 7/1/2007 2388 31 H2O 31,475 1015 MPB-05A 8/1/2007 2418 25 H2O 24,399 976 MPB-05A 9/1/2007 2356 30 H2O 27,557 919 MPB-05A 10/1/2007 2374 31 H2O 29,869 964 MPB-05A 11/1/2007 2566 30 H2O 40,151 1338 MPB-05A 12/1/2007 2529 31 H2O 35,697 1152 MPB-08 1/1/2007 0 H2O 0 MPB-08 2/1/2007 0 H2O 0 MPB-08 3/1/2007 0 H2O 0 MPB-08 4/1/2007 0 H2O 0 MPB-08 5/1/2007 0 H2O 0 MPB-08 6/1/2007 0 H2O 0 MPB-08 7/1/2007 0 H2O 0 MPB-08 8/1/2007 0 H2O 0 MPB-08 9/1/2007 0 H2O 0 MPB-08 10/1/2007 0 H2O 0 MPB-08 11/1/2007 0 H2O 0 MPB-08 12/1/2007 0 H2O 0 MPB-11 1/1/2007 2032 31 H2O 18,023 581 MPB-11 2/1/2007 1867 28 H2O 15,990 571 MPB-11 3/1/2007 1960 31 H2O 18,538 598 MPB-11 4/1/2007 2140 12 H2O 7,684 640 MPB-11 5/1/2007 0 H2O 0 MPB-11 6/1/2007 0 H2O 0 MPB-11 7/1/2007 0 H2O 0 MPB-11 8/1/2007 0 H2O 0 MPB-11 9/1/2007 0 H2O 0 MPB-11 10/1/2007 0 H2O 0 MPB-11 11/1/2007 0 H2O 0 MPB-11 12/1/2007 0 H2O 0 MPB-12 1/1/2007 2203 31 H2O 53,421 1723 MPB-12 2/1/2007 2162 28 H2O 54,693 1953 MPB-12 3/1/2007 2276 31 H2O 61,868 1996 MPB-12 4/1/2007 2437 30 H2O 57,322 1911 MPB-12 5/1/2007 2384 31 H2O 52,275 1686 MPB-12 6/1/2007 2395 30 H2O 55,101 1837 MPB-12 7/1/2007 2384 31 H2O 51,231 1653 MPB-12 8/1/2007 2399 25 H2O 43,432 1737 MPB-12 9/1/2007 2161 30 H2O 46,859 1562 MPB-12 10/1/2007 2325 31 H2O 53,083 1712 MPB-12 11/1/2007 2530 30 H2O 67,395 2247 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPB-12 12/1/2007 2483 31 H2O 66,170 2135 MPB-14 1/1/2007 2115 31 H2O 46,027 1485 MPB-14 2/1/2007 1980 28 H2O 42,863 1531 MPB-14 3/1/2007 2074 31 H2O 46,761 1508 MPB-14 4/1/2007 2229 30 H2O 49,708 1657 MPB-14 5/1/2007 2201 31 H2O 47,195 1522 MPB-14 6/1/2007 2245 30 H2O 47,381 1579 MPB-14 7/1/2007 2339 31 H2O 55,426 1788 MPB-14 8/1/2007 2325 25 H2O 43,842 1754 MPB-14 9/1/2007 2124 30 H2O 38,119 1271 MPB-14 10/1/2007 2253 31 H2O 50,690 1635 MPB-14 11/1/2007 2341 30 H2O 57,932 1931 MPB-14 12/1/2007 2316 31 H2O 55,889 1803 MPB-17 1/1/2007 0 H2O 0 MPB-17 2/1/2007 0 H2O 0 MPB-17 3/1/2007 0 H2O 0 MPB-17 4/1/2007 0 H2O 0 MPB-17 5/1/2007 0 H2O 0 MPB-17 6/1/2007 0 H2O 0 MPB-17 7/1/2007 0 H2O 0 MPB-17 8/1/2007 0 H2O 0 MPB-17 9/1/2007 0 H2O 0 MPB-17 10/1/2007 0 H2O 0 MPB-17 11/1/2007 0 H2O 0 MPB-17 12/1/2007 0 H2O 0 MPB-18 1/1/2007 0 H2O 0 MPB-18 2/1/2007 0 H2O 0 MPB-18 3/1/2007 0 H2O 0 MPB-18 4/1/2007 0 H2O 0 MPB-18 5/1/2007 0 H2O 0 MPB-18 6/1/2007 0 H2O 0 MPB-18 7/1/2007 0 H2O 0 MPB-18 8/1/2007 0 H2O 0 MPB-18 9/1/2007 0 H2O 0 MPB-18 10/1/2007 0 H2O 0 MPB-18 11/1/2007 0 H2O 0 MPB-18 12/1/2007 0 H2O 0 MPB-25 1/1/2007 2389 31 H2O 26,516 855 MPB-25 2/1/2007 2266 28 H2O 26,344 941 MPB-25 3/1/2007 2386 31 H2O 28,661 925 MPB-25 4/1/2007 2579 9 H2O 7,435 826 MPB-25 5/1/2007 0 H2O 0 MPB-25 6/1/2007 0 H2O 0 MPB-25 7/1/2007 0 H2O 0 MPB-25 8/1/2007 0 H2O 0 MPB-25 9/1/2007 0 H2O 0 MPB-25 10/1/2007 1722 2 H2O 930 465 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPB-25 11/1/2007 1996 30 H2O 17,953 598 MPB-25 12/1/2007 2285 31 H2O 21,898 706 MPC -02 1/1/2007 1989 30 H2O 35,939 1198 MPC -02 2/1/2007 1703 28 H2O 28,693 1025 MPC -02 3/1/2007 1855 31 H2O 34,544 1114 MPC -02 4/1/2007 2159 30 H2O 38,488 1283 MPC -02 5/1/2007 2440 31 H2O 46,727 1507 MPC -02 6/1/2007 1807 8 H2O 8,257 1032 MPC -02 7/1/2007 2007 31 H2O 33,084 1067 MPC -02 8/1/2007 2066 24 H2O 29,816 1242 MPC -02 9/1/2007 2150 30 H2O 39,538 1318 MPC -02 10/1/2007 2186 31 H2O 41,246 1331 MPC -02 11/1/2007 2130 30 H2O 41,572 1386 MPC -02 12/1/2007 2107 31 H2O 40,257 1299 MPC -06 1/1/2007 2290 27 H2O 39,646 1468 MPC -06 2/1/2007 3171 5 GAS 9,986 1997 MPC -06 3/1/2007 1834 5 GAS 2,209 442 MPC -06 3/1/2007 2207 18 H2O 30,438 1691 MPC -06 4/1/2007 2225 30 H2O 39,095 1303 MPC -06 5/1/2007 2246 31 H2O 36,408 1174 MPC -06 6/1/2007 2302 30 H2O 46,647 1555 MPC -06 7/1/2007 2357 31 H2O 53,051 1711 MPC -06 8/1/2007 1672 31 H2O 36,894 1190 MPC -06 9/1/2007 0 H2O 0 MPC -06 10/1/2007 1879 9 H2O 14,004 1556 MPC -06 11/1/2007 2141 30 H2O 47,451 1582 MPC -06 12/1/2007 2170 31 H2O 37,041 1195 MPC -08 1/1/2007 2383 31 H2O 9,188 296 MPC -08 2/1/2007 2259 28 H2O 12,873 460 MPC -08 3/1/2007 2500 31 H2O 16,663 538 MPC -08 4/1/2007 2299 7 H2O 2,783 398 MPC -08 5/1/2007 0 H2O 0 MPC -08 6/1/2007 0 H2O 0 MPC -08 7/1/2007 0 H2O 0 MPC -08 8/1/2007 1 2 H2O 122 61 MPC -08 9/1/2007 2347 21 H2O 11,125 530 MPC -08 10/1/2007 2446 27 H2O 12,460 461 MPC -08 11/1/2007 2593 30 H2O 22,886 763 MPC -08 12/1/2007 2548 31 H2O 13,107 423 MPC -10 1/1/2007 2858 31 H2O 53,093 1713 MPC -10 2/1/2007 2684 28 H2O 52,529 1876 MPC -10 3/1/2007 2826 31 H2O 50,534 1630 MPC -10 4/1/2007 2939 30 H2O 46,460 1549 MPC -10 5/1/2007 3024 31 H2O 54,039 1743 MPC -10 6/1/2007 2983 30 H2O 52,917 1764 MPC -10 7/1/2007 3082 21 H2O 38,490 1833 MPC -10 8/1/2007 2824 1 H2O 387 387 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPC -10 9/1/2007 0 H2O 0 MPC -10 10/1/2007 0 H2O 0 MPC -10 11/1/2007 0 H2O 0 MPC -10 12/1/2007 0 H2O 0 MPC -11 1/1/2007 0 H2O 0 MPC -11 2/1/2007 0 H2O 0 MPC -11 3/1/2007 0 H2O 0 MPC -11 4/1/2007 0 H2O 0 MPC -11 5/1/2007 0 H2O 0 MPC -11 6/1/2007 0 H2O 0 MPC -11 7/1/2007 0 H2O 0 MPC -11 8/1/2007 0 H2O 0 MPC -11 9/1/2007 0 H2O 0 MPC -11 10/1/2007 0 H2O 0 MPC -11 11/1/2007 0 H2O 0 MPC -11 12/1/2007 0 H2O 0 MPC -12A 1/1/2007 0 GAS 0 MPC -12A 2/1/2007 0 GAS 0 MPC -12A 3/1/2007 0 GAS 0 MPC -12A 4/1/2007 0 GAS 0 MPC -12A 5/1/2007 0 GAS 0 MPC -12A 6/1/2007 0 GAS 0 MPC -12A 7/1/2007 0 GAS 0 MPC -12A 8/1/2007 0 GAS 0 MPC -12A 9/1/2007 0 GAS 0 MPC -12A 10/1/2007 0 GAS 0 MPC -12A 11/1/2007 0 GAS 0 MPC -12A 12/1/2007 0 GAS 0 MPC -15 1/1/2007 2165 31 H2O 31,937 1030 MPC -15 2/1/2007 2140 8 H2O 7,703 963 MPC -15 3/1/2007 0 H2O 0 MPC -15 4/1/2007 0 H2O 0 MPC -15 5/1/2007 0 H2O 0 MPC -15 6/1/2007 0 H2O 0 MPC -15 7/1/2007 0 H2O 0 MPC -15 8/1/2007 0 H2O 0 MPC -15 9/1/2007 0 H2O 0 MPC -15 10/1/2007 0 H2O 0 MPC -15 11/1/2007 0 H2O 0 MPC -15 12/1/2007 1679 30 H2O 51,991 1733 MPC -17 1/1/2007 0 GAS 0 MPC -17 2/1/2007 0 GAS 0 MPC -17 3/1/2007 0 GAS 0 MPC -17 4/1/2007 0 GAS 0 MPC -17 5/1/2007 0 GAS 0 MPC -17 6/1/2007 0 GAS 0 MPC -17 7/1/2007 0 GAS 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPC -17 8/1/2007 0 GAS 0 MPC -17 9/1/2007 0 GAS 0 MPC -17 10/1/2007 0 GAS 0 MPC -17 11/1/2007 0 GAS 0 MPC -17 12/1/2007 0 GAS 0 MPC -19 1/1/2007 3873 31 GAS 76,019 2452 MPC -19 2/1/2007 0 GAS 0 MPC -19 3/1/2007 0 GAS 0 MPC -19 4/1/2007 0 GAS 0 MPC -19 5/1/2007 0 GAS 0 MPC -19 6/1/2007 0 GAS 0 MPC -19 7/1/2007 0 GAS 0 MPC -19 8/1/2007 0 GAS 0 MPC -19 9/1/2007 0 GAS 0 MPC -19 10/1/2007 0 GAS 0 MPC -19 11/1/2007 0 GAS 0 MPC -19 12/1/2007 0 GAS 0 MPC -25A 1/1/2007 0 GAS 0 MPC -25A 2/1/2007 0 GAS 0 MPC -25A 3/1/2007 0 GAS 0 MPC -25A 4/1/2007 0 GAS 0 MPC -25A 5/1/2007 0 GAS 0 MPC -25A 6/1/2007 0 GAS 0 MPC -25A 7/1/2007 0 GAS 0 MPC -25A 8/1/2007 0 GAS 0 MPC -25A 9/1/2007 0 GAS 0 MPC -25A 10/1/2007 0 GAS 0 MPC -25A 11/1/2007 0 GAS 0 MPC -25A 12/1/2007 0 GAS 0 MPC -28A 1/1/2007 2985 30 H2O 21,995 733 MPC -28A 2/1/2007 3071 28 H2O 14,242 509 MPC -28A 3/1/2007 3235 31 H2O 14,905 481 MPC -28A 4/1/2007 3303 30 H2O 12,936 431 MPC -28A 5/1/2007 3377 31 H2O 12,136 391 MPC -28A 6/1/2007 1296 14 H2O 8,574 612 MPC -28A 7/1/2007 0 H2O 0 MPC -28A 8/1/2007 65 1 H2O 102 102 MPC -28A 9/1/2007 1022 30 H2O 41,247 1375 MPC -28A 10/1/2007 1282 31 H2O 43,125 1391 MPC -28A 11/1/2007 1239 30 H2O 46,132 1538 MPC -28A 12/1/2007 1188 31 H2O 51,146 1650 MPC -36 1/1/2007 2779 31 H2O 41,310 1333 MPC -36 2/1/2007 2601 28 H2O 43,976 1571 MPC -36 3/1/2007 2682 31 H2O 36,865 1189 MPC -36 4/1/2007 2761 30 H2O 36,099 1203 MPC -36 5/1/2007 2841 31 H2O 41,279 1332 MPC -36 6/1/2007 2827 30 H2O 41,567 1386 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPC -36 7/1/2007 2904 31 H2O 47,555 1534 MPC -36 8/1/2007 2808 24 H2O 33,651 1402 MPC -36 9/1/2007 2882 26 H2O 39,799 1531 MPC -36 10/1/2007 2737 31 H2O 43,656 1408 MPC -36 11/1/2007 2878 30 H2O 45,102 1503 MPC -36 12/1/2007 5132 5 GAS 4,114 823 MPC -36 12/1/2007 2639 8 H2O 10,080 1260 MPC -39 1/1/2007 3124 31 H2O 30,250 976 MPC -39 2/1/2007 2899 28 H2O 29,859 1066 MPC -39 3/1/2007 3133 31 H2O 34,898 1126 MPC -39 4/1/2007 3238 28 H2O 30,596 1093 MPC -39 5/1/2007 3291 31 H2O 35,388 1142 MPC -39 6/1/2007 3187 30 H2O 30,752 1025 MPC -39 7/1/2007 3245 31 H2O 33,453 1079 MPC -39 8/1/2007 3186 24 H2O 27,368 1140 MPC -39 9/1/2007 3210 25 H2O 29,599 1184 MPC -39 10/1/2007 3037 31 H2O 29,976 967 MPC -39 11/1/2007 3225 30 H2O 30,994 1033 MPC -39 12/1/2007 3205 31 H2O 32,566 1051 MPC -42 1/1/2007 2649 31 H2O 36,735 1185 MPC -42 2/1/2007 2689 8 H2O 10,729 1341 MPC -42 3/1/2007 4073 29 GAS 24,253 836 MPC -42 4/1/2007 3985 30 GAS 25,350 845 MPC -42 5/1/2007 3888 25 GAS 33,989 1360 MPC -42 6/1/2007 2765 10 GAS 10,678 1068 MPC -42 7/1/2007 3219 10 GAS 6,935 694 MPC -42 8/1/2007 1569 1 GAS 86 86 MPC -42 9/1/2007 1457 3 GAS 950 317 MPC -42 10/1/2007 2819 4 GAS 2,708 677 MPC -42 11/1/2007 3236 30 GAS 35,549 1185 MPC -42 12/1/2007 3373 8 GAS 10,523 1315 MPCFP-2 1/1/2007 0 H2O 0 MPCFP-2 2/1/2007 0 H2O 0 MPCFP-2 3/1/2007 0 H2O 0 MPCFP-2 4/1/2007 0 H2O 0 MPCFP-2 5/1/2007 0 H2O 0 MPCFP-2 6/1/2007 0 H2O 0 MPCFP-2 7/1/2007 0 H2O 0 MPCFP-2 8/1/2007 0 H2O 0 MPCFP-2 9/1/2007 0 H2O 0 MPCFP-2 10/1/2007 0 H2O 0 MPCFP-2 11/1/2007 0 H2O 0 MPCFP-2 12/1/2007 0 H2O 0 MPE-02 1/1/2007 0 GAS 0 MPE-02 2/1/2007 0 GAS 0 MPE-02 3/1/2007 0 GAS 0 MPE-02 4/1/2007 0 GAS 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPE-02 5/1/2007 0 GAS 0 MPE-02 6/1/2007 0 GAS 0 MPE-02 7/1/2007 0 GAS 0 MPE-02 8/1/2007 0 GAS 0 MPE-02 9/1/2007 0 GAS 0 MPE-02 10/1/2007 0 GAS 0 MPE-02 11/1/2007 0 GAS 0 MPE-02 12/1/2007 0 GAS 0 MPE-03 1/1/2007 3359 31 GAS 17,817 575 MPE-03 2/1/2007 3365 22 GAS 17,118 778 MPE-03 3/1/2007 3333 30 GAS 19,291 643 MPE-03 4/1/2007 3279 25 GAS 4,353 174 MPE-03 5/1/2007 3309 31 GAS 27,792 897 MPE-03 6/1/2007 3294 30 GAS 36,346 1212 MPE-03 7/1/2007 3424 31 GAS 60,521 1952 MPE-03 8/1/2007 3392 24 GAS 27,339 1139 MPE-03 9/1/2007 3370 30 GAS 43,914 1464 MPE-03 10/1/2007 3405 31 GAS 36,446 1176 MPE-03 11/1/2007 3259 30 GAS 21,208 707 MPE-03 12/1/2007 3306 29 GAS 22,704 783 MPE-05 1/1/2007 0 H2O 0 MPE-05 2/1/2007 0 H2O 0 MPE-05 3/1/2007 2203 13 H2O 16,635 1280 MPE-05 4/1/2007 2379 30 H2O 44,900 1497 MPE-05 5/1/2007 2364 31 H2O 35,720 1152 MPE-05 6/1/2007 2499 28 H2O 47,302 1689 MPE-05 7/1/2007 2428 23 H2O 32,192 1400 MPE-05 8/1/2007 2547 19 H2O 31,063 1635 MPE-05 9/1/2007 2531 20 H2O 27,810 1391 MPE-05 10/1/2007 8 3 GAS 1,437 479 MPE-05 10/1/2007 2539 14 H2O 21,456 1533 MPE-05 11/1/2007 2569 30 H2O 44,551 1485 MPE-05 12/1/2007 2220 19 H2O 27,383 1441 MPE-07 1/1/2007 2427 31 H2O 89,140 2875 MPE-07 2/1/2007 2259 28 H2O 85,352 3048 MPE-07 3/1/2007 2503 31 H2O 102,261 3299 MPE-07 4/1/2007 2439 30 H2O 76,352 2545 MPE-07 5/1/2007 2369 31 H2O 75,385 2432 MPE-07 6/1/2007 2469 30 H2O 87,219 2907 MPE-07 7/1/2007 2486 31 H2O 82,981 2677 MPE-07 8/1/2007 2533 19 H2O 53,750 2829 MPE-07 9/1/2007 2294 29 H2O 76,954 2654 MPE-07 10/1/2007 2416 31 H2O 77,375 2496 MPE-07 11/1/2007 2584 30 H2O 86,229 2874 MPE-07 12/1/2007 2409 31 H2O 69,498 2242 MPE-16 1/1/2007 2480 31 H2O 8,942 288 MPE-16 2/1/2007 2314 28 H2O 9,851 352 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPE-16 3/1/2007 2561 31 H2O 12,192 393 MPE-16 4/1/2007 2529 30 H2O 9,242 308 MPE-16 5/1/2007 2445 31 H2O 8,324 269 MPE-16 6/1/2007 2516 30 H2O 10,924 364 MPE-16 7/1/2007 2524 31 H2O 9,359 302 MPE-16 8/1/2007 2552 19 H2O 6,405 337 MPE-16 9/1/2007 2505 29 H2O 10,345 357 MPE-16 10/1/2007 2498 31 H2O 9,345 301 MPE-16 11/1/2007 2673 30 H2O 12,726 424 MPE-16 12/1/2007 2611 31 H2O 10,558 341 MPE-17 1/1/2007 2466 31 H2O 42,105 1358 MPE-17 2/1/2007 2300 28 H2O 45,146 1612 MPE-17 3/1/2007 2298 31 H2O 33,906 1094 MPE-17 4/1/2007 2204 30 H2O 28,719 957 MPE-17 5/1/2007 2111 31 H2O 21,642 698 MPE-17 6/1/2007 2026 30 H2O 26,734 891 MPE-17 7/1/2007 2375 31 H2O 53,752 1734 MPE-17 8/1/2007 2461 19 H2O 39,929 2102 MPE-17 9/1/2007 2287 29 H2O 46,940 1619 MPE-17 10/1/2007 2430 31 H2O 55,280 1783 MPE-17 11/1/2007 2568 30 H2O 57,538 1918 MPE-17 12/1/2007 2522 31 H2O 51,351 1656 MPE-23 1/1/2007 2432 31 H2O 105,578 3406 MPE-23 2/1/2007 2376 22 H2O 72,316 3287 MPE-23 3/1/2007 0 H2O 0 MPE-23 4/1/2007 2047 18 H2O 58,264 3237 MPE-23 5/1/2007 2146 31 H2O 92,375 2980 MPE-23 6/1/2007 2331 30 H2O 106,766 3559 MPE-23 7/1/2007 2378 31 H2O 105,777 3412 MPE-23 8/1/2007 2318 19 H2O 64,678 3404 MPE-23 9/1/2007 1991 29 H2O 75,183 2593 MPE-23 10/1/2007 2074 31 H2O 79,594 2568 MPE-23 11/1/2007 2294 30 H2O 93,356 3112 MPE-23 12/1/2007 2338 31 H2O 93,900 3029 MPE-26 1/1/2007 234 31 H2O 17,528 565 MPE-26 2/1/2007 217 28 H2O 15,867 567 MPE-26 3/1/2007 433 31 H2O 18,715 604 MPE-26 4/1/2007 453 30 H2O 10,855 362 MPE-26 5/1/2007 982 31 H2O 23,780 767 MPE-26 6/1/2007 882 30 H2O 16,916 564 MPE-26 7/1/2007 870 31 H2O 23,752 766 MPE-26 8/1/2007 808 19 H2O 12,314 648 MPE-26 9/1/2007 1103 29 H2O 25,036 863 MPE-26 10/1/2007 1223 31 H2O 17,285 558 MPE-26 11/1/2007 1058 30 H2O 18,512 617 MPE-26 12/1/2007 1199 31 H2O 24,750 798 MPF -10 1/1/2007 3070 31 H2O 47,660 1537 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -10 2/1/2007 2873 28 H2O 37,799 1350 MPF -10 3/1/2007 2935 31 H2O 36,721 1185 MPF -10 4/1/2007 4688 5 GAS 3,437 687 MPF -10 4/1/2007 3148 25 H2O 35,368 1415 MPF -10 5/1/2007 4736 31 GAS 32,318 1043 MPF -10 6/1/2007 4628 30 GAS 37,106 1237 MPF -10 7/1/2007 4601 31 GAS 44,269 1428 MPF -10 8/1/2007 4596 20 GAS 27,432 1372 MPF -10 9/1/2007 4741 5 GAS 4,711 942 MPF -10 9/1/2007 2736 22 H2O 35,371 1608 MPF -10 10/1/2007 2832 31 H2O 42,373 1367 MPF -10 11/1/2007 2917 30 H2O 42,509 1417 MPF -10 12/1/2007 3084 31 H2O 47,024 1517 MPF -17 1/1/2007 0 H2O 0 MPF -17 2/1/2007 0 H2O 0 MPF -17 3/1/2007 0 H2O 0 MPF -17 4/1/2007 0 H2O 0 MPF -17 5/1/2007 0 H2O 0 MPF -17 6/1/2007 0 H2O 0 MPF -17 7/1/2007 0 H2O 0 MPF -17 8/1/2007 0 H2O 0 MPF -17 9/1/2007 0 H2O 0 MPF -17 10/1/2007 0 H2O 0 MPF -17 11/1/2007 0 H2O 0 MPF -17 12/1/2007 0 H2O 0 MPF -26 1/1/2007 3339 31 H2O 61,153 1973 MPF -26 2/1/2007 2725 28 H2O 33,756 1206 MPF -26 3/1/2007 2708 31 H2O 40,825 1317 MPF -26 4/1/2007 2621 30 H2O 34,498 1150 MPF -26 5/1/2007 2414 31 H2O 33,235 1072 MPF -26 6/1/2007 2477 30 H2O 43,300 1443 MPF -26 7/1/2007 2633 31 H2O 50,987 1645 MPF -26 8/1/2007 2548 19 H2O 31,091 1636 MPF -26 9/1/2007 2525 30 H2O 53,168 1772 MPF -26 10/1/2007 4979 6 GAS 9,092 1515 MPF -26 10/1/2007 2734 26 H2O 45,316 1743 MPF -26 11/1/2007 4610 30 GAS 91,134 3038 MPF -26 12/1/2007 4500 26 GAS 62,781 2415 MPF -26 12/1/2007 2507 6 H2O 6,643 1107 MPF -30 1/1/2007 4115 12 GAS 19,690 1641 MPF -30 1/1/2007 2065 18 H2O 36,602 2033 MPF -30 2/1/2007 2209 28 H2O 50,850 1816 MPF -30 3/1/2007 2508 31 H2O 53,129 1714 MPF -30 4/1/2007 2744 30 H2O 53,742 1791 MPF -30 5/1/2007 2896 31 H2O 57,085 1841 MPF -30 6/1/2007 2769 30 H2O 54,880 1829 MPF -30 7/1/2007 3026 22 H2O 37,213 1692 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -30 8/1/2007 4298 10 GAS 16,735 1674 MPF -30 9/1/2007 4286 27 GAS 42,725 1582 MPF -30 10/1/2007 4299 31 GAS 59,623 1923 MPF -30 11/1/2007 4305 21 GAS 55,780 2656 MPF -30 11/1/2007 2164 9 H2O 20,416 2268 MPF -30 12/1/2007 2606 31 H2O 75,468 2434 MPF -41 1/1/2007 0 H2O 0 MPF -41 2/1/2007 0 H2O 0 MPF -41 3/1/2007 0 H2O 0 MPF -41 4/1/2007 0 H2O 0 MPF -41 5/1/2007 0 H2O 0 MPF -41 6/1/2007 0 H2O 0 MPF -41 7/1/2007 0 H2O 0 MPF -41 8/1/2007 0 H2O 0 MPF -41 9/1/2007 0 H2O 0 MPF -41 10/1/2007 0 H2O 0 MPF -41 11/1/2007 0 H2O 0 MPF -41 12/1/2007 0 H2O 0 MPF -42 1/1/2007 4706 20 GAS 6,301 315 MPF -42 1/1/2007 3296 12 H2O 35,191 2933 MPF -42 2/1/2007 4085 28 GAS 35,959 1284 MPF -42 3/1/2007 4092 28 GAS 51,632 1844 MPF -42 3/1/2007 2083 1 H2O 2,117 2117 MPF -42 4/1/2007 2556 30 H2O 81,576 2719 MPF -42 5/1/2007 2965 31 H2O 92,001 2968 MPF -42 6/1/2007 3151 30 H2O 87,495 2917 MPF -42 7/1/2007 3200 31 H2O 84,618 2730 MPF -42 8/1/2007 4631 12 GAS 3,167 264 MPF -42 8/1/2007 3211 8 H2O 21,950 2744 MPF -42 9/1/2007 4319 16 GAS 27,927 1745 MPF -42 10/1/2007 4296 26 GAS 48,371 1860 MPF -42 10/1/2007 2224 5 H2O 12,322 2464 MPF -42 11/1/2007 2446 30 H2O 69,899 2330 MPF -42 12/1/2007 2699 31 H2O 76,575 2470 MPF -46 1/1/2007 3329 31 H2O 93,118 3004 MPF -46 2/1/2007 3135 28 H2O 78,404 2800 MPF -46 3/1/2007 3276 31 H2O 83,999 2710 MPF -46 4/1/2007 3406 30 H2O 81,007 2700 MPF -46 5/1/2007 3306 31 H2O 83,671 2699 MPF -46 6/1/2007 2656 30 H2O 82,497 2750 MPF -46 7/1/2007 3510 31 H2O 86,352 2786 MPF -46 8/1/2007 3219 19 H2O 49,864 2624 MPF -46 9/1/2007 3076 30 H2O 83,647 2788 MPF -46 10/1/2007 3285 31 H2O 85,873 2770 MPF -46 11/1/2007 3350 30 H2O 84,233 2808 MPF -46 12/1/2007 3424 31 H2O 89,348 2882 MPF -49 1/1/2007 2408 31 H2O 64,285 2074 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -49 2/1/2007 2242 28 H2O 57,921 2069 MPF -49 3/1/2007 2109 22 H2O 29,998 1364 MPF -49 4/1/2007 1982 13 H2O 15,232 1172 MPF -49 5/1/2007 3806 4 GAS 10,821 2705 MPF -49 6/1/2007 3878 30 GAS 39,521 1317 MPF -49 7/1/2007 3792 31 GAS 36,352 1173 MPF -49 8/1/2007 3754 20 GAS 25,186 1259 MPF -49 9/1/2007 996 1 GAS 538 538 MPF -49 10/1/2007 13631 1 GAS 28 28 MPF -49 10/1/2007 1452 29 H2O 46,828 1615 MPF -49 11/1/2007 1701 30 H2O 55,107 1837 MPF -49 12/1/2007 1843 31 H2O 62,967 2031 MPF -62 1/1/2007 819 21 H2O 54,734 2606 MPF -62 2/1/2007 794 28 H2O 53,247 1902 MPF -62 3/1/2007 702 31 H2O 64,991 2096 MPF -62 4/1/2007 810 30 H2O 67,382 2246 MPF -62 5/1/2007 942 31 H2O 70,242 2266 MPF -62 6/1/2007 798 30 H2O 72,966 2432 MPF -62 7/1/2007 882 31 H2O 81,490 2629 MPF -62 8/1/2007 943 23 H2O 56,900 2474 MPF -62 9/1/2007 998 30 H2O 85,295 2843 MPF -62 10/1/2007 1121 31 H2O 88,085 2841 MPF -62 11/1/2007 1041 30 H2O 70,680 2356 MPF -62 12/1/2007 1066 31 H2O 71,679 2312 MPF -70 1/1/2007 4058 4 GAS 7,291 1823 MPF -70 1/1/2007 2718 13 H2O 28,840 2218 MPF -70 2/1/2007 4001 28 GAS 72,882 2603 MPF -70 3/1/2007 4057 31 GAS 84,588 2729 MPF -70 4/1/2007 4211 26 GAS 63,517 2443 MPF -70 4/1/2007 2403 5 H2O 10,410 2082 MPF -70 5/1/2007 2311 31 H2O 76,578 2470 MPF -70 6/1/2007 2583 30 H2O 73,219 2441 MPF -70 7/1/2007 2704 31 H2O 75,033 2420 MPF -70 8/1/2007 2571 19 H2O 43,495 2289 MPF -70 9/1/2007 2498 30 H2O 70,454 2348 MPF -70 10/1/2007 2654 31 H2O 71,426 2304 MPF -70 11/1/2007 4634 10 GAS 13,852 1385 MPF -70 11/1/2007 2808 21 H2O 48,969 2332 MPF -70 12/1/2007 4415 31 GAS 85,445 2756 MPF -74 1/1/2007 3481 31 H2O 38,450 1240 MPF -74 2/1/2007 3186 28 H2O 31,741 1134 MPF -74 3/1/2007 3334 31 H2O 35,160 1134 MPF -74 4/1/2007 4766 5 GAS 93 19 MPF -74 4/1/2007 2332 1 H2O 212 212 MPF -74 5/1/2007 4738 31 GAS 11,204 361 MPF -74 6/1/2007 4656 29 GAS 20,042 691 MPF -74 7/1/2007 4641 31 GAS 30,925 998 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -74 8/1/2007 4644 20 GAS 23,922 1196 MPF -74 9/1/2007 4488 25 GAS 25,023 1001 MPF -74 10/1/2007 4663 6 GAS 5,221 870 MPF -74 10/1/2007 2727 26 H2O 34,793 1338 MPF -74 11/1/2007 3178 30 H2O 55,602 1853 MPF -74 12/1/2007 3430 31 H2O 46,166 1489 MPF -82 1/1/2007 0 GAS 0 MPF -82 2/1/2007 0 GAS 0 MPF -82 3/1/2007 0 GAS 0 MPF -82 4/1/2007 0 GAS 0 MPF -82 5/1/2007 0 GAS 0 MPF -82 6/1/2007 0 GAS 0 MPF -82 7/1/2007 0 GAS 0 MPF -82 8/1/2007 0 GAS 0 MPF -82 9/1/2007 0 GAS 0 MPF -82 10/1/2007 0 GAS 0 MPF -82 11/1/2007 0 GAS 0 MPF -82 12/1/2007 0 GAS 0 MPF -83 1/1/2007 4245 28 GAS 84,336 3012 MPF -83 2/1/2007 0 GAS 0 MPF -83 3/1/2007 2610 22 H2O 50,445 2293 MPF -83 4/1/2007 2705 30 H2O 72,758 2425 MPF -83 5/1/2007 2762 31 H2O 74,986 2419 MPF -83 6/1/2007 4230 26 GAS 61,832 2378 MPF -83 6/1/2007 3058 5 H2O 11,207 2241 MPF -83 7/1/2007 2852 22 H2O 50,331 2288 MPF -83 8/1/2007 2737 19 H2O 38,140 2007 MPF -83 9/1/2007 4502 16 GAS 29,797 1862 MPF -83 9/1/2007 2891 15 H2O 33,532 2235 MPF -83 10/1/2007 4339 27 GAS 49,629 1838 MPF -83 10/1/2007 2722 5 H2O 8,624 1725 MPF -83 11/1/2007 4281 10 GAS 13,444 1344 MPF -83 11/1/2007 2802 21 H2O 45,855 2184 MPF -83 12/1/2007 4088 31 GAS 64,256 2073 MPF -84B 1/1/2007 2105 30 H2O 44,875 1496 MPF -84B 2/1/2007 0 H2O 0 MPF -84B 3/1/2007 1585 22 H2O 51,809 2355 MPF -84B 4/1/2007 1667 30 H2O 62,595 2087 MPF -84B 5/1/2007 1715 31 H2O 66,502 2145 MPF -84B 6/1/2007 1769 30 H2O 67,617 2254 MPF -84B 7/1/2007 1696 31 H2O 63,744 2056 MPF -84B 8/1/2007 2978 1 GAS 296 296 MPF -84B 8/1/2007 1907 19 H2O 43,833 2307 MPF -84B 9/1/2007 1623 30 H2O 64,860 2162 MPF -84B 10/1/2007 1547 31 H2O 55,713 1797 MPF -84B 11/1/2007 1423 30 H2O 48,625 1621 MPF -84B 12/1/2007 1446 31 H2O 56,676 1828 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -85 1/1/2007 3270 31 H2O 51,544 1663 MPF -85 2/1/2007 3126 28 H2O 44,346 1584 MPF -85 3/1/2007 3293 31 H2O 46,256 1492 MPF -85 4/1/2007 3400 30 H2O 43,170 1439 MPF -85 5/1/2007 3409 31 H2O 43,816 1413 MPF -85 6/1/2007 3341 30 H2O 41,095 1370 MPF -85 7/1/2007 4449 15 GAS 25,352 1690 MPF -85 7/1/2007 3536 17 H2O 22,534 1326 MPF -85 8/1/2007 4541 13 GAS 16,466 1267 MPF -85 9/1/2007 4367 20 GAS 23,415 1171 MPF -85 10/1/2007 4348 31 GAS 39,548 1276 MPF -85 11/1/2007 4468 21 GAS 38,923 1853 MPF -85 11/1/2007 3472 10 H2O 26,432 2643 MPF -85 12/1/2007 3349 31 H2O 55,227 1782 MPF -88 1/1/2007 2007 31 H2O 81,054 2615 MPF -88 2/1/2007 1936 28 H2O 71,993 2571 MPF -88 3/1/2007 2014 31 H2O 77,842 2511 MPF -88 4/1/2007 2135 30 H2O 79,920 2664 MPF -88 5/1/2007 3829 27 GAS 48,227 1786 MPF -88 5/1/2007 2747 5 H2O 10,687 2137 MPF -88 6/1/2007 3317 22 GAS 21,095 959 MPF -88 6/1/2007 1452 8 H2O 19,750 2469 MPF -88 7/1/2007 1762 31 H2O 79,839 2575 MPF -88 8/1/2007 1859 23 H2O 58,117 2527 MPF -88 9/1/2007 1682 30 H2O 83,861 2795 MPF -88 10/1/2007 1729 31 H2O 86,317 2784 MPF -88 11/1/2007 3699 21 GAS 53,171 2532 MPF -88 11/1/2007 1711 9 H2O 23,972 2664 MPF -88 12/1/2007 3491 8 GAS 16,833 2104 MPF -88 12/1/2007 1486 24 H2O 54,955 2290 MPF -89 1/1/2007 2850 31 H2O 30,339 979 MPF -89 2/1/2007 2549 28 H2O 19,802 707 MPF -89 3/1/2007 2792 29 H2O 20,496 707 MPF -89 4/1/2007 2904 30 H2O 26,726 891 MPF -89 5/1/2007 2853 31 H2O 29,265 944 MPF -89 6/1/2007 2859 30 H2O 27,351 912 MPF -89 7/1/2007 2848 31 H2O 28,034 904 MPF -89 8/1/2007 2683 19 H2O 15,514 817 MPF -89 9/1/2007 2678 30 H2O 23,884 796 MPF -89 10/1/2007 2763 31 H2O 23,626 762 MPF -89 11/1/2007 2722 30 H2O 23,151 772 MPF -89 12/1/2007 2729 31 H2O 37,421 1207 MPF -90 1/1/2007 3436 31 H2O 21,407 691 MPF -90 2/1/2007 3197 28 H2O 18,835 673 MPF -90 3/1/2007 3338 31 H2O 20,154 650 MPF -90 4/1/2007 4676 11 GAS 362 33 MPF -90 4/1/2007 1966 1 H2O 79 79 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -90 5/1/2007 4755 24 GAS 2,200 92 MPF -90 6/1/2007 4912 6 GAS 916 153 MPF -90 6/1/2007 3021 9 H2O 10,281 1142 MPF -90 7/1/2007 3400 31 H2O 26,849 866 MPF -90 8/1/2007 3359 18 H2O 13,074 726 MPF -90 9/1/2007 3181 30 H2O 26,642 888 MPF -90 10/1/2007 3443 31 H2O 23,167 747 MPF -90 11/1/2007 3443 30 H2O 20,535 685 MPF -90 12/1/2007 3439 31 H2O 19,942 643 MPF -91 1/1/2007 2561 30 H2O 17,088 570 MPF -91 2/1/2007 2084 12 H2O 8,713 726 MPF -91 3/1/2007 2719 29 H2O 30,517 1052 MPF -91 4/1/2007 2790 30 H2O 27,370 912 MPF -91 5/1/2007 4669 2 GAS 1,336 668 MPF -91 5/1/2007 2644 16 H2O 11,584 724 MPF -91 6/1/2007 3685 30 GAS 29,599 987 MPF -91 7/1/2007 3576 31 GAS 28,417 917 MPF -91 8/1/2007 3629 20 GAS 23,982 1199 MPF -91 9/1/2007 3503 20 GAS 26,709 1335 MPF -91 10/1/2007 3541 26 GAS 30,242 1163 MPF -91 10/1/2007 2710 5 H2O 6,243 1249 MPF -91 11/1/2007 2573 30 H2O 19,649 655 MPF -91 12/1/2007 2937 31 H2O 29,680 957 MPF -92 1/1/2007 3422 31 H2O 39,313 1268 MPF -92 2/1/2007 3140 28 H2O 33,284 1189 MPF -92 3/1/2007 3275 31 H2O 35,218 1136 MPF -92 4/1/2007 3318 21 H2O 19,044 907 MPF -92 5/1/2007 2282 5 H2O 3,194 639 MPF -92 6/1/2007 2782 30 H2O 21,681 723 MPF -92 7/1/2007 2947 31 H2O 28,017 904 MPF -92 8/1/2007 2776 19 H2O 15,554 819 MPF -92 9/1/2007 2810 30 H2O 25,245 842 MPF -92 10/1/2007 2985 31 H2O 34,873 1125 MPF -92 11/1/2007 3016 30 H2O 21,432 714 MPF -92 12/1/2007 2897 22 H2O 21,174 962 MPF -95 1/1/2007 4243 10 GAS 9,487 949 MPF -95 1/1/2007 2518 18 H2O 51,767 2876 MPF -95 2/1/2007 2701 28 H2O 78,072 2788 MPF -95 3/1/2007 2798 31 H2O 65,368 2109 MPF -95 4/1/2007 2527 30 H2O 41,304 1377 MPF -95 5/1/2007 2445 29 H2O 40,359 1392 MPF -95 6/1/2007 2211 30 H2O 38,660 1289 MPF -95 7/1/2007 2214 31 H2O 41,951 1353 MPF -95 8/1/2007 2124 19 H2O 28,182 1483 MPF -95 9/1/2007 1999 30 H2O 37,444 1248 MPF -95 10/1/2007 2022 31 H2O 39,173 1264 MPF -95 11/1/2007 1992 26 H2O 33,641 1294 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -95 12/1/2007 1830 15 H2O 24,850 1657 MPF -99 10/1/2007 2950 15 H2O 12,599 840 MPF -99 11/1/2007 2941 30 H2O 23,104 770 MPF -99 12/1/2007 3136 31 H2O 25,585 825 MPH -06 1/1/2007 0 H2O 0 MPH -06 2/1/2007 0 H2O 0 MPH -06 3/1/2007 0 H2O 0 MPH -06 4/1/2007 0 H2O 0 MPH -06 5/1/2007 0 H2O 0 MPH -06 6/1/2007 0 H2O 0 MPH -06 7/1/2007 0 H2O 0 MPH -06 8/1/2007 0 H2O 0 MPH -06 9/1/2007 0 H2O 0 MPH -06 10/1/2007 0 H2O 0 MPH -06 11/1/2007 0 H2O 0 MPH -06 12/1/2007 0 H2O 0 MPJ -11 1/1/2007 2019 31 H2O 26,073 841 MPJ -11 2/1/2007 1908 28 H2O 25,652 916 MPJ -11 3/1/2007 1696 11 H2O 10,020 911 MPJ -11 4/1/2007 2071 30 H2O 42,196 1407 MPJ -11 5/1/2007 2101 31 H2O 39,787 1283 MPJ -11 6/1/2007 2187 30 H2O 40,726 1358 MPJ -11 7/1/2007 2164 31 H2O 41,085 1325 MPJ -11 8/1/2007 2185 22 H2O 27,414 1246 MPJ -11 9/1/2007 2053 30 H2O 37,811 1260 MPJ -11 10/1/2007 1988 31 H2O 34,363 1108 MPJ -11 11/1/2007 2084 30 H2O 38,516 1284 MPJ -11 12/1/2007 2063 31 H2O 36,880 1190 MPJ -13 1/1/2007 1711 31 H2O 28,795 929 MPJ -13 2/1/2007 1707 28 H2O 37,609 1343 MPJ -13 3/1/2007 1726 10 H2O 9,596 960 MPJ -13 4/1/2007 1777 30 H2O 26,313 877 MPJ -13 5/1/2007 1768 26 H2O 21,335 821 MPJ -13 6/1/2007 1700 30 H2O 29,833 994 MPJ -13 7/1/2007 1049 31 H2O 37,200 1200 MPJ -13 8/1/2007 1976 15 H2O 6,206 414 MPJ -13 9/1/2007 1834 22 H2O 23,589 1072 MPJ -13 10/1/2007 1815 4 H2O 1,027 257 MPJ -13 11/1/2007 1940 28 H2O 29,759 1063 MPJ -13 12/1/2007 1986 31 H2O 32,955 1063 MPJ -16 1/1/2007 0 H2O 0 MPJ -16 2/1/2007 0 H2O 0 MPJ -16 3/1/2007 0 H2O 0 MPJ -16 4/1/2007 0 H2O 0 MPJ -16 5/1/2007 0 H2O 0 MPJ -16 6/1/2007 0 H2O 0 MPJ -16 7/1/2007 0 H2O 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPJ -16 8/1/2007 0 H2O 0 MPJ -16 9/1/2007 0 H2O 0 MPJ -16 10/1/2007 0 H2O 0 MPJ -16 11/1/2007 0 H2O 0 MPJ -16 12/1/2007 0 H2O 0 MPK-18A 1/1/2007 0 H2O 0 MPK-18A 2/1/2007 0 H2O 0 MPK-18A 3/1/2007 0 H2O 0 MPK-18A 4/1/2007 0 H2O 0 MPK-18A 5/1/2007 707 22 H2O 44,825 2038 MPK-18A 6/1/2007 678 26 H2O 51,577 1984 MPK-18A 7/1/2007 341 31 H2O 25,955 837 MPK-18A 8/1/2007 259 18 H2O 9,780 543 MPK-18A 9/1/2007 0 H2O 0 MPK-18A 10/1/2007 0 H2O 0 MPK-18A 11/1/2007 574 23 H2O 39,103 1700 MPK-18A 12/1/2007 596 31 H2O 51,110 1649 MPK-21A 1/1/2007 0 H2O 0 MPK-21A 2/1/2007 0 H2O 0 MPK-21A 3/1/2007 0 H2O 0 MPK-21A 4/1/2007 0 H2O 0 MPK-21A 5/1/2007 992 22 H2O 35,901 1632 MPK-21A 6/1/2007 884 30 H2O 43,674 1456 MPK-21A 7/1/2007 905 26 H2O 35,782 1376 MPK-21A 8/1/2007 0 H2O 0 MPK-21A 9/1/2007 691 30 H2O 26,804 893 MPK-21A 10/1/2007 758 31 H2O 35,877 1157 MPK-21A 11/1/2007 584 30 H2O 27,540 918 MPK-21A 12/1/2007 528 31 H2O 27,900 900 MPK-22 1/1/2007 231 2 H2O 2,089 1045 MPK-22 2/1/2007 0 H2O 0 MPK-22 3/1/2007 0 H2O 0 MPK-22 4/1/2007 0 H2O 0 MPK-22 5/1/2007 0 H2O 0 MPK-22 6/1/2007 686 30 H2O 17,525 584 MPK-22 7/1/2007 651 31 H2O 34,100 1100 MPK-22 8/1/2007 678 18 H2O 3,453 192 MPK-22 9/1/2007 661 30 H2O 33,000 1100 MPK-22 10/1/2007 642 31 H2O 34,443 1111 MPK-22 11/1/2007 658 30 H2O 37,070 1236 MPK-22 12/1/2007 581 31 H2O 24,972 806 MPK-43A 1/1/2007 0 H2O 0 MPK-43A 2/1/2007 0 H2O 0 MPK-43A 3/1/2007 0 H2O 0 MPK-43A 4/1/2007 0 H2O 0 MPK-43A 5/1/2007 648 2 H2O 1,302 651 MPK-43A 6/1/2007 0 H2O 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPK-43A 7/1/2007 511 7 H2O 5,877 840 MPK-43A 8/1/2007 741 18 H2O 15,409 856 MPK-43A 9/1/2007 965 30 H2O 28,364 945 MPK-43A 10/1/2007 1303 31 H2O 31,221 1007 MPK-43A 11/1/2007 1334 30 H2O 30,472 1016 MPK-43A 12/1/2007 1451 31 H2O 32,450 1047 MPL-08 1/1/2007 2182 6 H2O 3,487 581 MPL-08 2/1/2007 1965 28 H2O 13,312 475 MPL-08 3/1/2007 2175 31 H2O 17,047 550 MPL-08 4/1/2007 2407 30 H2O 20,784 693 MPL-08 5/1/2007 2430 31 H2O 21,544 695 MPL-08 6/1/2007 2625 30 H2O 29,076 969 MPL-08 7/1/2007 2847 31 H2O 34,835 1124 MPL-08 8/1/2007 2707 19 H2O 20,541 1081 MPL-08 9/1/2007 2975 30 H2O 40,566 1352 MPL-08 10/1/2007 3089 31 H2O 40,011 1291 MPL-08 11/1/2007 3123 30 H2O 37,462 1249 MPL-08 12/1/2007 3122 31 H2O 38,360 1237 MPL-09 1/1/2007 3871 10 GAS 28,506 2851 MPL-09 2/1/2007 3702 28 GAS 69,166 2470 MPL-09 3/1/2007 2653 3 GAS 4,707 1569 MPL-09 3/1/2007 2228 22 H2O 32,422 1474 MPL-09 4/1/2007 2449 30 H2O 50,374 1679 MPL-09 5/1/2007 2577 31 H2O 51,967 1676 MPL-09 6/1/2007 2534 30 H2O 52,146 1738 MPL-09 7/1/2007 2766 31 H2O 52,588 1696 MPL-09 8/1/2007 2576 19 H2O 29,454 1550 MPL-09 9/1/2007 2640 28 H2O 42,844 1530 MPL-09 10/1/2007 4813 9 GAS 9,428 1048 MPL-09 10/1/2007 2742 23 H2O 30,674 1334 MPL-09 11/1/2007 4527 22 GAS 44,043 2002 MPL-09 12/1/2007 4277 25 GAS 41,342 1654 MPL-10 1/1/2007 0 H2O 0 MPL-10 2/1/2007 0 H2O 0 MPL-10 3/1/2007 0 H2O 0 MPL-10 4/1/2007 0 H2O 0 MPL-10 5/1/2007 0 H2O 0 MPL-10 6/1/2007 0 H2O 0 MPL-10 7/1/2007 0 H2O 0 MPL-10 8/1/2007 0 H2O 0 MPL-10 9/1/2007 0 H2O 0 MPL-10 10/1/2007 0 H2O 0 MPL-10 11/1/2007 0 H2O 0 MPL-10 12/1/2007 0 H2O 0 MPL-15 1/1/2007 3051 31 H2O 94,265 3041 MPL-15 2/1/2007 3009 28 H2O 88,497 3161 MPL-15 3/1/2007 3188 31 H2O 87,784 2832 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPL-15 4/1/2007 4596 16 GAS 19,849 1241 MPL-15 4/1/2007 2463 1 H2O 1,132 1132 MPL-15 5/1/2007 4551 31 GAS 90,794 2929 MPL-15 6/1/2007 3042 16 GAS 10,769 673 MPL-15 6/1/2007 3392 15 H2O 44,169 2945 MPL-15 7/1/2007 3267 31 H2O 87,698 2829 MPL-15 8/1/2007 3070 19 H2O 46,410 2443 MPL-15 9/1/2007 3106 30 H2O 70,769 2359 MPL-15 10/1/2007 3164 31 H2O 66,605 2149 MPL-15 11/1/2007 2575 16 H2O 28,174 1761 MPL-15 12/1/2007 2999 31 H2O 65,901 2126 MPL-16A 1/1/2007 1921 31 H2O 80,710 2604 MPL-16A 2/1/2007 1707 28 H2O 71,796 2564 MPL-16A 3/1/2007 1947 31 H2O 91,333 2946 MPL-16A 4/1/2007 2032 30 H2O 90,078 3003 MPL-16A 5/1/2007 2052 31 H2O 95,891 3093 MPL-16A 6/1/2007 2039 30 H2O 96,395 3213 MPL-16A 7/1/2007 2100 31 H2O 106,626 3440 MPL-16A 8/1/2007 1943 19 H2O 58,932 3102 MPL-16A 9/1/2007 1976 30 H2O 89,344 2978 MPL-16A 10/1/2007 2237 31 H2O 95,561 3083 MPL-16A 11/1/2007 1820 30 H2O 46,100 1537 MPL-16A 12/1/2007 3318 13 GAS 24,439 1880 MPL-16A 12/1/2007 1837 8 H2O 10,673 1334 MPL-21 1/1/2007 0 GAS 0 MPL-21 2/1/2007 0 GAS 0 MPL-21 3/1/2007 0 GAS 0 MPL-21 4/1/2007 0 GAS 0 MPL-21 5/1/2007 0 GAS 0 MPL-21 6/1/2007 0 GAS 0 MPL-21 7/1/2007 0 GAS 0 MPL-21 8/1/2007 0 GAS 0 MPL-21 9/1/2007 0 GAS 0 MPL-21 10/1/2007 0 GAS 0 MPL-21 11/1/2007 0 GAS 0 MPL-21 12/1/2007 0 GAS 0 MPL-24 1/1/2007 4477 31 GAS 34,880 1125 MPL-24 2/1/2007 4084 28 GAS 31,486 1125 MPL-24 3/1/2007 4147 31 GAS 33,400 1077 MPL-24 4/1/2007 4572 30 GAS 54,427 1814 MPL-24 5/1/2007 4635 7 GAS 14,157 2022 MPL-24 5/1/2007 2972 23 H2O 38,910 1692 MPL-24 6/1/2007 3168 30 H2O 53,447 1782 MPL-24 7/1/2007 3239 31 H2O 52,661 1699 MPL-24 8/1/2007 3028 19 H2O 28,962 1524 MPL-24 9/1/2007 3249 30 H2O 56,906 1897 MPL-24 10/1/2007 3356 31 H2O 58,520 1888 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPL-24 11/1/2007 8455 1 GAS 122 122 MPL-24 11/1/2007 3471 9 H2O 15,609 1734 MPL-24 12/1/2007 4142 27 GAS 23,050 854 MPL-32 1/1/2007 3342 31 H2O 54,900 1771 MPL-32 2/1/2007 3054 28 H2O 48,781 1742 MPL-32 3/1/2007 3155 31 H2O 44,352 1431 MPL-32 4/1/2007 3212 30 H2O 41,793 1393 MPL-32 5/1/2007 4798 30 GAS 38,947 1298 MPL-32 5/1/2007 3461 2 H2O 2,408 1204 MPL-32 6/1/2007 4598 30 GAS 60,117 2004 MPL-32 7/1/2007 4604 31 GAS 74,905 2416 MPL-32 8/1/2007 4786 9 GAS 21,448 2383 MPL-32 8/1/2007 2891 11 H2O 16,724 1520 MPL-32 9/1/2007 3259 30 H2O 50,512 1684 MPL-32 10/1/2007 3302 31 H2O 48,354 1560 MPL-32 11/1/2007 3382 20 H2O 31,275 1564 MPL-32 12/1/2007 2938 20 H2O 26,371 1319 MPL-33 1/1/2007 3308 31 H2O 153,392 4948 MPL-33 2/1/2007 2831 28 H2O 104,654 3738 MPL-33 3/1/2007 2844 31 H2O 103,896 3351 MPL-33 4/1/2007 2943 30 H2O 99,443 3315 MPL-33 5/1/2007 3130 31 H2O 127,207 4103 MPL-33 6/1/2007 4516 5 GAS 14,072 2814 MPL-33 6/1/2007 3019 25 H2O 87,962 3518 MPL-33 7/1/2007 4087 31 GAS 140,493 4532 MPL-33 8/1/2007 3857 21 GAS 80,499 3833 MPL-33 9/1/2007 3639 14 GAS 32,934 2352 MPL-33 9/1/2007 2931 16 H2O 63,693 3981 MPL-33 10/1/2007 2773 31 H2O 107,597 3471 MPL-33 11/1/2007 2789 30 H2O 101,868 3396 MPL-33 12/1/2007 2935 31 H2O 113,826 3672 MPL-34 1/1/2007 0 H2O 0 MPL-34 2/1/2007 0 H2O 0 MPL-34 3/1/2007 0 H2O 0 MPL-34 4/1/2007 0 H2O 0 MPL-34 5/1/2007 0 H2O 0 MPL-34 6/1/2007 0 H2O 0 MPL-34 7/1/2007 0 H2O 0 MPL-34 8/1/2007 0 H2O 0 MPL-34 9/1/2007 0 H2O 0 MPL-34 10/1/2007 0 H2O 0 MPL-34 11/1/2007 0 H2O 0 MPL-34 12/1/2007 0 H2O 0 MPL-39 1/1/2007 0 H2O 0 MPL-39 2/1/2007 0 H2O 0 MPL-39 3/1/2007 0 H2O 0 MPL-39 4/1/2007 0 H2O 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPL-39 5/1/2007 0 H2O 0 MPL-39 6/1/2007 0 H2O 0 MPL-39 7/1/2007 0 H2O 0 MPL-39 8/1/2007 0 H2O 0 MPL-39 9/1/2007 0 H2O 0 MPL-39 10/1/2007 0 H2O 0 MPL-39 11/1/2007 0 H2O 0 MPL-39 12/1/2007 0 H2O 0 MPL-42 1/1/2007 0 GAS 0 MPL-42 2/1/2007 0 GAS 0 MPL-42 3/1/2007 0 GAS 0 MPL-42 4/1/2007 0 GAS 0 MPL-42 5/1/2007 0 GAS 0 MPL-42 6/1/2007 0 GAS 0 MPL-42 7/1/2007 0 GAS 0 MPL-42 8/1/2007 0 GAS 0 MPL-42 9/1/2007 3010 11 GAS 18,125 1648 MPL-42 10/1/2007 3723 31 GAS 56,800 1832 MPL-42 11/1/2007 3692 7 GAS 18,536 2648 MPL-42 12/1/2007 0 GAS 0 Section 3 Schrader Bluff Oil Pool List of Exhibits Waterflood Pattern Map 3-A Total Reservoir Production Plot 3-B Total Reservoir Injection Plot 3-C Pertinent Data Summary 3-D Reservoir Voidage Balance 3-E Static Pressure Data 3-F Injection Rate & Pressure Data By Well 3-G Daily Allocation Factors 3-H Well Test Frequency 3-I Schrader Bluff Oil Pool Waterflood Project Summary The Schrader Bluff Oil Pool waterflood area is shown in Exhibit 3-A. The locations of production and injection well pairings are shown to give a general visualization of waterflood polygons, but do not show estimated waterflood sweep. There were 54 producing wells and 44 injection wells that contributed to production/injection during 2007. Two of the 44 wells were the pilot WAG injectors, while the remaining 42 were water only injectors. Note that the count of 44 injectors counts wells with a long string and short string dual completion as a single well. If long strings and short strings within a well were counted separately, there would be 57 active injectors. Exhibit 3-B shows a production plot for the Schrader Bluff reservoir covering the entire project history through December 2007. The Schrader Bluff Oil Pool oil production averaged 11.2 MSTBD for 2007 compared to 12.8 MSTBD in 2006. This represents an oil production decrease of 13% in 2007. Much of this oil decline occurred as a result of the September 2006 shut-in of S -pad, the highest rate producing pad in the Schrader Bluff pool, as a result of concerns around pipeline integrity. The pipeline replacement was completed in 1Q 2007 and S -pad returned to production in April. Excluding the S -pad shut in, Schrader Bluff oil decline was minimal this year, a result of the rigorous reservoir management program. During 2006 there was an active campaign to shut-in otherwise normally producing higher -GOR wells to reduce free gas voidage from areas of the reservoir that are thought to be under -supported. The goal is to reduce excessive free gas evolution from Schrader Bluff oil which is thought to increase oil viscosity and reduce ultimate recovery. Water production averaged 15.6 MBWD in 2007 compared to 11.6 MBWD in 2006. Cumulative production since waterflood startup through the end of 2007 is 53.2 MMSTB of oil, 34.1 BSCF of gas, and 29.5 MMSTB of water. Exhibit 3-C shows an injection plot for the Schrader Bluff reservoir covering the entire project history through December 2007. The water injection rate averaged 26.3 MBWD for 2007. Water injection in 2006 averaged 31.2 MBWD. This represents a decrease in water injection of 16% in 2007. As with production, the decrease in injection is primarily due to shutting in S -pad, where most injection was shut-in to ensure injection was not over voidage. Cumulative water injection since waterflood startup through the end of 2007 is 88.5 MMSTB. Gas injection in the Schrader began in 2006. Gas injection rates for 2007 averaged 173 MSCFD. The average gas injection rate in 2006 was also 173 MSCFD. Cumulative gas injection through the end of 2007 is 125 MMSCF. Since December 2006, the waterflood balance has decreased from a cumulative under -injection of 34.4 MMRB to 32.4 MMRB. The high cumulative under -injection in the Schrader Bluff reservoir is due to several factors: in the early days of the more recent Schrader Bluff developments there was some pre -production; a number of producers are in small hydraulic units where drilling injectors cannot be justified economically; and injection pressures and hence rates have been reduced to mitigate matrix bypass events (MBEs), where water breaks through at the producer without effective sweep through the matrix. In the supported water flood patterns, under -injection is minimal. Additionally, free gas is included in the voidage calculation which leads to the VRR being conservatively low. The average voidage replacement ratio, or VRR, for 2007 was 0.83, which is a slight drop from the 2006 VRR of 0.92. This decrease is primarily due to a number of prolific injectors being shut in for part of the year. Starting in March, an improvement was made in the VRR month -on -month, culminating with a VRR of 0.98 for Dec 2007. This gradual improvement was due to several items: a recompletion to return MPG -07 to injection following well integrity issues, drilling new injector MPH -17, wellwork on MPI -16 to return to injection following slickline issues, as well as gradual increases in injection on several injectors as the comfort level increased regarding maximum injection pressures. Water cut increased from 47.5% in 2006 to 58.3% in 2007. In 2007 two new producers were drilled, MPS -01A, which has struggled with high watercuts, and MPH -19, which was not brought online until early 2008. With no new wells with low watercuts being brought on, there was nothing to offset the increase in watercut as the waterflood matures as a whole. GOR decreased from 628 SCF/STB in 2006 to 477 SCF/STB in 2007, primarily due to the continued diligence around reservoir management and the deliberate shut-in of higher -GOR producers as described in paragraph two of this sub -section. Exhibit 3-D presents a summary of the pertinent production information for the Schrader Bluff Oil Pool for 2007. Exhibit 3-E shows a monthly breakdown of production and injection data for the report period. Exhibit 3-F presents the reservoir pressure data for the Schrader Bluff wells taken during 2007. The average of the pressures obtained in 2007 was 1655 psi (note that this is not a volumetric average). This change is an increase from the average of the pressures obtained in 2006 of 1523 psi. It should be noted that a concerted effort was made during 2006 to gather pressure data from parts of the reservoir that were suspected to be under -supported. The data gathered from these parts of the reservoir are expected to be below the average reservoir pressure. Additionally, it was hoped that the VRR increase in 2006 would help to push up average reservoir pressure in the area, and from 2007 pressure data gathered; it would appear to have done so. Exhibit 3-G provides a monthly summary of individual well injection rate and injection pressure data for all of the Schrader Bluff Oil Pool injectors. Exhibit 3-H provides daily oil, gas, and water allocation factors for the Milne Point facility for 2007. The average oil allocation factor for 2007 was 0.87 with a standard deviation of 0.12. The gas allocation factor averaged 1.17 with a standard deviation of 1.2 1, while the water allocation factor averaged 1.37 with a standard deviation of 0.26. It should be noted that the allocation factors immediately preceding and following the full field facility shutdown have a significant effect on the overall standard deviation, in particular for the gas. For example, if a value of 23.94 for the gas is omitted on August 29, following the facility turnaround, the gas allocation factor average becomes 1.11 with a standard deviation of 0.18. Exhibit 3-I provides information on the well tests conducted for consideration in production allocation during 2007. Milne Point primarily utilizes on -pad separators for well testing. Separators at B, C, E, F, H, K and L pads employ volumetric vessel -based gas-liquid separation; separators at I, J and S pad employ centrifugal separation. A variety of metering technologies are employed: Turbine positive -displacement or MicroMotion coriolis meters for liquid flow rate Phase Dynamics watercut meters on the separator liquid legs Turbine or MicroMotion coriolis meters for gas flow rate Wells are automatically routed into test on a rolling schedule, such that a well is always being tested on each pad. Test duration is at least 6 hours, plus the necessary purge time to flush the lines and vessel. When well behavior warrants further investigation the test frequency is increased. Portable test separators, provided by contractor ASRC, are utilized where there is not a functioning test separator (G -pad and I -pad) and where increased confidence is required in the test data, primarily for Schrader wells but occasionally for Kuparuk wells. Validation of pad separator results by use of the portable separator helps in the planning of maintenance and upgrades for the on -pad separators. Work is on-going to improve confidence in the current pad separators, such as the use of new types of multi -phase meters, as well as proper use of chemical additives such as emulsion breaker. Specifically, metering at the H pad test separator was upgraded according to company best practice, and the multiphase ASRC portable test unit #5 was commissioned and extensively tested at MPU. Further testing of these and other technologies will be ongoing through 2008. Future development plans for the Schrader Bluff oil pool include ongoing infill and pattern redevelopment in the S -pad and Tract 14 areas, potential expansion into undeveloped areas in the North West area of the pool, and the further evaluation of a hot water flood at S -pad. With active development and infill planning, we will continue to evaluate our long-term shut in wellbores for use in recompletions, conversions, and sidetracks. Surveillance plans for 2008 are to obtain injection profiles on the required number of multi -zone injectors as well as to obtain profiles on injectors critical for reservoir management. Geochemical production analysis is planned to resume in the Schrader Bluff producers but at a decreased frequency as well as on a smaller subset of wells where results have been determined to be more reliable. Water injection management will continue to utilize the selective single injectors with Waterflood Regulating Valves, the dual -string injectors, as well as the new Reshiject screened completion on new injector MPH -17. by Exhibit 3-A 0*0 Schrader Bluff Formation Waterflood Pattern Map Milne Point Unit, March 2008 MPL-37A 1 12 MPI -13 'I-11 13 • MPI -11L1 J MPJ -18 1 6A 3 SBF Waterflood Polygons 18 17 MPE-15 MPE-25A 14 L1 16 INerr 0 3 100 70 m m 50 O N v 40 i 0 o` 30 L) U d 3 20 10 I] Exhibit 3-B BP ALASKA - Milne Point Unit Schrader Reservoir, Total Production 10 I■i I 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 Oil Prod Cum SCH Water Prod Rale SCH —Gas Prod Cum SCH —Oil Prod Rate SCH —Water Prod Cum SCH Gas Prod Rate SCH 100000 O 10 1.2 1.0 ♦ 0.8 40 0.6 Lw O O 0.4 0.2 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 SCH_ ♦ Producers OnLine X Gas/011 Ratio SCH rr Exhibit 3-C BP ALASKA - Milne Point Unit Schrader Reservoir, Injection 100000 3 a 10 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Water Inj Cum SCH — Gas Inj Cum SCH --X-- Gas Inj Rate SCH — Water Inj Rate SCH 40 35 • so c p 25 0 20 c ib 15 10 5 0 92 93 94 95 96 97 95 99 00 01 02 03 04 05 06 07 08 ♦ Water Injectors Online —Gas Injectors OnUne M► ♦ � A N♦ A ♦♦ ♦QI► 40 tl► N 411► 92 93 94 95 96 97 95 99 00 01 02 03 04 05 06 07 08 ♦ Water Injectors Online —Gas Injectors OnUne Exhibit 3-D Milne Point Unit - Schrader Bluff Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2007 WATERFLOOD START-UP DATE: March 1992 Prior to Waterflood Start -Up Oil (MSTB) 902 Gas (MMSCF) 303 Water (MSTB) 136 Since Waterflood Start -Up: Oil (MSTB) 52,343 Gas (MMSCF) 33,763 Water (MSTB) 29,398 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 88,475 Injection Gas (MMSCF) 125 AVERAGE OF PRESSURES OBTAINED IN 2007 @ 4.000' TVD ss December, 2007 Pressure (psig) 1,655 WELL COUNT (Wells in Operation)* Production Wells 54 WAG Injection 2 Water Only Injection 42 Gas Only Injection 0 Notes: Reflects ONLY operating wells Exhibit 3-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Schrader Bluff Oil Pool January - December 2007 Production: Injection: Oil Water Gas Reservoir Water Gas Voidage Voidage Voidage Month Prod Rate Prod Rate Prod Rate Voidage Inj Rate Inj Rate Replacement Replacement Balance (stb/day) (stb/day) (mscf/day) (rbbVday) (stb/day) (mscf/day) (rbbVday) Ratio (rbbl/day) 1/31/2007 7,283 8,987 2,712 18,799 23,202 0 23,434 1.25 4,635 2/28/2007 6,816 10,012 2,593 19,290 18,364 0 18,547 0.96 -743 3/31/2007 6,881 9,900 3,697 20,865 12,931 0 13,061 0.63 -7,804 4/30/2007 12,121 19,223 6,294 38,230 26,630 0 26,897 0.70 -11,334 5/31/2007 13,639 17,657 6,103 37,556 27,275 0 27,548 0.73 -10,008 6/30/2007 12,982 17,660 6,016 36,915 26,580 0 26,846 0.73 -10,069 7/31/2007 13,319 16,945 6,649 37,395 26,488 0 26,752 0.72 -10,642 8/31/2007 8,723 11,940 4,396 25,403 17,908 0 18,088 0.71 -7,315 9/30/2007 11,882 15,429 6,338 34,276 29,035 69 29,426 0.86 -4,849 10/31/2007 13,044 19,478 5,598 38,180 31,678 626 32,921 0.86 -5,258 11/30/2007 14,048 19,923 6,595 40,892 37,448 543 38,625 0.94 -2,266 12/31/2007 13,317 19,928 7,019 40,953 38,495 836 40,118 0.98 -835 Average: 2007 11,171 15,590 5,334 32,396 26,336 173 26,855 0.83 -5,541 Cumulative: mstb mstb mmscf mrb mstb mmscf mrb mrb 31 -DBC -07 53,245 29,534 34,066 121,981 88,475 125 89,544 0.73 -32,437 Blue text indicates metered rates. Red text indicates calculated numbers. Exhibit 3-F Static Pressure Data Schrader Bluff Pool STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RESERVOIR PRESSURE REPORT 1. Operator: BPXA 2. Address: 900 E. sermon Blvd Anchomige, Aleska 9950842% 3. Unit or Lea. Name: Milne Paint 4. RW end Pod: Sohrader 810 Pod 5. Datum RWe..:4X0' SS It. Oil GM. API =14-22 7. G. Gra . A9.0.a5 9. WWI Name and Number. 9. API Number 50 10. 01 (0) a Gm XXX-XXXXX-Xx-Xx (G) 11. AOGCC 12. R &! Teel Pool Code Dale 13. shut -In Time, Hours 14. Prem. Sun" 15. B.H. Type (see Temp. instruc8ons for sad.) 1& DepOi 17. Rnal 18. D91um Tod WDes Observed WDsa Premure a (Input) Tod DepN 19. Premum Gradlad. MR. M. Premure W Datum (sal) Comer mds Zone MPB-02 60-500-29206-62-00 INJ 525140 314/07 360 PFO 46 315 4,000 0.433 2,027 N MPB-27LS 50.600-29232-33-80 INJ 525141 3/22/07 466 PFO 57 228 4,000 0.433 1,935 OA MPB-27SS 50-500-29232-33-81 INJ 525144 3/3/07 336 PFO 57 104 4,000 0.433 1,811 N MPC -41 50-500-29230-14-00 PROD 525140 2/15(07 1656 SBHP 87 4114 1,563 4,000 0.399 1,518 OA MPC -41 50-50029230-14.00 PROD 525140 3/19/07 2448 PP 4133 1,584 4,000 0.400 1,531 OA MPE-12 50500-29232-62-00 INJ 525140 1/21/07 2160 SBHP Be 4371 1,892 4,000 0.433 1,731 OA MPE-13BLS 50500-29225-3080 INJ 525143 2`7/07 408 IPFO.59 315 4,000 0.433 2,021 OA MPE-13BLS 5050029225-36-80 INJ 525142 5/26/07 600 PFO 59 334 4,000 0.433 2,040 OA MPE-15 50500-29225-2000 PROD 525140 7/11/07 2280 PP 4065 1,502 4,000 0.400 1,476 N+OA MPE-15 50500-29225-28-00 PROD 525140 9/2/07 336 PP 4065 1,470 4,000 0.400 1,444 N+OA MPE-20A 5050029225-61-01 PROD 525140 9/4/07 384 PP 4167 1,265 4,000 0.400 1,198 N+OA MPE-24A 50500-29228-67-01 PROD 525140 8/25/07 144 PP 4162 1,208 4,000 0.400 1,143 OA+OB MPE-28 50-500-29232-59-00 PROD 525140 9/9/07 2616 PP 4109 1,213 4,000 0.400 1,169 N MPE-30A 50-500-29229-03-01 PROD 525140 2/14107 2328 SBHP 94 4176 1,654 4,000 0.402 1,583 OA MPE-30A 50-500-29229-03-01 PROD 525140 9/22/07 7680 SBHP 92 4203 1,735 4,000 0.393 1,655 OA MPE-31 50500-29232-63-00 PROD 525140 8/28/07 216 SBHP 120 4223 1,714 4,000 0.402 1,624 OA MPE-32 50-500-29232-61-00 PROD 525140 1/29/07 312 PP 4333 1,366 4,000 0.400 1,233 N+OA MPE-32 50500-29232-61-00 IPROD 525140 1812607 144 IPP 14333 11,181 4,000 0.400 11,048 N+OA MPG -02 50500-29219-2000 INJ 525140 8126107 90 SBHP 106 3589 919 4,000 0.404 1,085 NA+NB+NC MPG -03A 50-500-29219-42-01 INJ 525140 3120/07 336 SBHP 83 4258 2,333 4,000 0.422 2,224 N+OA+OB MPG -05 5050029221-38-00 INJ 525140 3/6/07 11494 SBHP 72 3953 1,934 4,000 0.400 1,953 N+OA+OB MPG -05 5050029221-38-00 INJ 525140 3/7/07 11496 SBHP 72 3580 1,772 4,000 0.400 1,940 N+OA+OB MPG -07 50-50029221-4000 INJ 525140 9/19/07 10316 SBHP 82 4192 1,946 4,000 0.479 1,854 OB MPG -07 50500-29221-4000 INJ 525140 9/29/07 10512 SBHP 82 4127 1,822 4,000 0.439 1,766 OA MPG -07 50500-29221-4000 INJ 525140 9/29/07 10512 SBHP 85 3980 1,915 4,000 0.455 1,933 N MPG-OBA 5050029221-41-01 PROD 525140 11/12/07 34176 PP 3331 1,678 4,000 0.401 1,946 OA+OB+N MPG -10 50500-29227-8000 INJ 525140 1/10/08 141 SBHP 91 4147 2,227 4,000 0.380 2,171 OA+OB+N MPG -11 5050029227-81-00 PROD 525140 1/16107 48197 PBU 82 2,248 4,000 0.548 2,191 OA+OB MPG -14 50-500-2923031-00 IPROD 525140 8/25/07 57 lSBHP 88 13862 11,020 4,000 10.376 11.072 N+OA+OB MPG -15 50500-29227-8400 PROD 525140 9/20/07 3060 PP 81 3868 1,718 4,000 0.402 1,771 OA+OB+N MPG-17LS 50500-29231-92-80 INJ 525140 3/21/07 2928 SBHP 79 4023 1,827 4,000 0.347 1,819 OB MPG-17SS 50500-29231-92-81 INJ 525140 3/22/07 2928 SBHP 77 4014 1,861 4,000 0.458 1,855 OA MPG -18 5050029231-9400 PROD 525140 5/10/07 5668 PP 81.4 4023 1,508 4,000 0.394 1,499 OA+OB MPG -19 5050029232-28-00 INJ 525140 816/07 4344 SBHP 83 4297 2,049 4,000 0.442 1,918 OB MPG -19 5050029232-28-00 INJ 525140 9/30/07 1296 SBHP 81 4297 1,735 4,000 0.441 1,604 OA MPH -04 50-500-29220-6400 PROD 525140 1/29/07 336 PP 3553 1,055 4,000 0.445 1,254 N+OA+OB MPH -07A 5050029225-97-01 PROD 525140 9/23/07 749 SBHP 59 2899 1,234 4,000 0.318 1,271 OA+OB MPH -088 50-500-29228-08-02 PROD 525140 8124107 9984 PP 70.5 3238 1,228 4,000 0.399 1,532 OA+OB MPH -0813 50 -50029228 -OB -02 PROD 525140 11/10/07 11712 SBHP 49 2476 881 4,000 0.397 1,487 OA+OB MPH -10 50-50029227.95-00 PROD 525140 1/17/07 170 SBHP 78 3577 1,151 4,000 10.301 1,204 OA+OB+N MPH -10 50500-29227-95-00 PROD 525140 5/18/07 1056 PP 82 3784 1,376 4,000 0.402 1,463 OA+OB+N MPH -14 5050029227-96-00 PROD 525140 12/31/06 4032 PP 3969 1,444 4,000 0.379 1,517 N+OA+OB MPH -15 50-50029232-8400 INJ 525140 3/7/07 1008 PFO 4,000 0.408 1,631 Pressure stabilized for PTA. OA+OB MPH -15 50500-29232-8400 INJ 525140 4/27/07 792 PFO 1,912 4,000 0.385 1,541 Pressure did not stabilize. OA MPH -15 50-500-29232-8400 INJ 525140 4127/07 792 PFO 1,917 4,000 0.420 1,678 Pressure stabilized, but quality riot I OB MPH -16 50500-29232-27-00 PROD 525140 4/4/07 1848 PP 78 3863 1,281 4,000 0.402 1,336 OA+OB MPH -17 50-50029233-5000 INJ 525140 9/1/07 1488 SBHP 80 3998 1,688 4,000 0.422 1,888 NE+OA MPI-02LS 50600-2922066-80 INJ 525140 3/16/07 432 SBHP 85 4010 2,170 4,000 0.534 IOB MPI-02SS 605002922086.81 INJ 525140 3115/07 312 SBHP 82 3935 2,058 4,000 0.514 2,056 OA MPI-02SS 50500-282206E81 INJ 525140 6/27/07 170 PFO 2,639 14,000 0.660 12,639 Data quality poor, but PTA perforri Exhibit 3-F Static Pressure Data Schrader Bluff Pool I. Well Name and Number: 9. API Number 50 10. Oil (0) or Gas XXX-XXXXX-XX-XX (G) 11. AOGCC 12. Final Test Pool Code Date 13. Shut -In Time. Hours 14. Press. Sunt. 15. B.H. Type (sea Temp. instructions for .deal 16. Depth 17. Final 18. Datum Tool WDss Observed Woes Pressure at (input) Tool Depth 19. Pressure Gradient psVft. 20. Pressure at Datum (cap Commenk Zone MPI -04A 50.500-29220-68-01 PROD 525140 8/27/2007 97 SBHP 88 3651 848 4,000 0.412 992 N+OA+OB MPI -05 50-500-29225-83-00 INJ 525140 6/14/2007 2605 SBHP 89 3804 1,852 4,000 0.447 1,940 N MPI -08 50 -500.29228 -21 -DO PROD 525140 5/412007 1440 SBHP 93 3731 1,479 4,000 0.439 1,597 NB MPI -D8 50-500-29228-21-00 PROD 525140 5/4/2007 1440 SBHP Be 3832 1,661 4,000 0.434 1,734 OA MPI -08 50 -500 -29228 -21 -DO PROD 625140 5/19/2007 215 SBHP 93 3923 1,779 4,000 0.335 1,805 OB MPI -09 5D-500-29229-6400 INJ 525140 3/28/2007 636 PFO 1,964 4,000 0.443 1,772 Good data for PTA. OB MPI -10 5D-500-29229-66.00 INJ 525140 3/13/2007 203 SBHP 84 3765 1,933 4,000 0.400 12.027 OA+OB MPI -11 50-500-29230-33.00 PROD 525140 10/19/2007 39809 SBHP 47 2403 1,070 4,000 0.380 1,676 OA+OB MPI -12 50.500-29230-38-00 PROD 525140 10/17/2007 41268 PP 79 3536 1,462 4,000 0.440 1,666 OA+OB MPI -14 60.500.29232-14-00 PROD 525140 8/16/2007 199 SBHP 80 3508 1,039 4,000 0.397 1,235 NB+OA+OB MPI -15 50-500-29231-06-00 PROD 625140 12/12/2007 1440 PP 74 3564 1,571 4,000 0.376 1,735 OA+OB MPI -16 50-500-29232-21-00 INJ 525140 6/20/2007 271 PFO 2,407 4,000 0.607 2,427 Pressure did trot stabilize. NB MPI -16 5D-500-29232.21.00 INJ 525140 6/20/2007 271 PFO 2,271 4,000 0.533 2,132 Pressure did not stablize. OA MPI -16 50.500-29232-21-00 INJ 525140 &20/2007 271 PFO 2,447 4,000 0.571 2282 Pressure did rat stablize. OB MPI -19 50.500-29232-18-00 PROD 525140 6(7/2007 2520 PP 79 3782 1,192 4,000 0.440 1,288 OA+OB MPJ -02 50-500-29220.71-00 INJ 525140 3/7/2007 220 SBHP 80 3918 1,968 4,000 0.439 2,004 NB MPJ -03 50-500-29220.72-00 PROD 525140 8/26/2007 84 SBHP 78 3502 1,356 4,000 0.412 1,561 N+OA+OB MPJ -04 50-500-29220.73-00 PROD 1525140 2/2/2007 11675 SBHP 80 3426 1,469 14,000 0.404 1,701 1 N+OA+OB MPJ -08A 50.500-2922497-01 PROD 525140 2/1/2007 3445 SBHP 84 3678 1,265 4,000 0.382 1,388 OB MPJ -09A 50.500-2922495-01 PROD 525140 11/12/2007 33408 PP 72 3638 888 4,000 0.401 1,033 OA MPJ -15 50-50D-29229.52.00 INJ 525140 3/13/2007 222 SBHP 80 3783 1,759 4,000 0.383 1,842 NB+OA+OB MPJ -17 50.500.29228.28.00 INJ 525140 4113/2007 376 SBHP 90 3785 1,606 4,000 0.441 1,701 NB MPJ -17 5650629228-28-00 INJ 525140 4/13/2007 376 SBHP 90 3924 2,217 4,000 0.434 2,250 OA MPJ -17 50-50D-2922528.00 INJ 525140 4/13/2007 376 SBHP 90 3971 1,420 4,000 0.453 1,433 OB MPJ -18 50-500-292253400 INJ 525140 &29/2007 226 SBHP 86 3841 2,694 4,000 0.439 2,764 Ni MPJ -23 50.500-29229-70-00 PROD 525140 4/22/2007 24143 SBHP 71 3501 1,916 4,000 0.438 2,135 OA+OB MPJ -23 50-500-29229-70-00 PROD 525140 10/15/2007 4248 PP 3504 1,515 4,000 0.379 1,703 OA+OB MPJ -24 50-500-29229-7500 PROD 625140 6110(2007 2954 SBHP 81 3708 1,399 4,000 0.401 1,516 OA+OB MPJ -26 50-50D-292252500 PROD 1525M 9/4/2007 1312 PP 178 13805 1,098 4,000 0.447 11,184 1 N+OA+OB MPL-45 50.500-29229-13-00 PROD 525140 2/5/2007 51851 SBHP 156 13025 1,352 4,000 0.245 11,590 OA MPS -01A 50-50D-29231-41-01 PROD 525140 6`17/2007 169 SBHP 78 4041 1,800 4,000 0.559 1,777 OA MPS -02 50-500-29231-69-00 INJ 625140 2/13/2007 696 SBHP 3882 1,660 4,000 0.203 1,684 NB MPS -02 50-500-29231-69-00 INJ 525140 2/132007 696 SBHP 4154 1,746 4,000 0.442 1,678 OB MPS -03 50-500.29231-0500 PROD 525140 12/1112OO7 389 SBHP 75 4046 1,423 4,000 0.432 1,403 OA MPSO4 5650629231-48-00 PROD 525140 2/8/2007 3312 PP 85 4059 1,380 4,000 0.441 1,334 OA+OB MPSO4 56500-29231-48-00 PROD 525140 10117/2007 312 PP 4141 1,659 4,000 0.440 1,597 OA+OB MPS -04 5650629231-48-00 PROD 525140 10131/2007 72 PP 4073 1,527 4,000 0.438 1,495 OA MPS -05 6650629231-0600 PROD 525140 2/8/2007 3312 PP 83 4107 1,180 4,000 0.439 1,133 OA+OB MPS -05 5650629231-0600 PROD 525140 10/2412007 3984 PP 3993 1,091 4,000 0.429 1,094 OA+OB MPS -06 50-500-29231-63-00 INJ 1625M 1/42007 2424 SBHP 83 4246 1,936 4,000 10.570 1,796 NB MPS-07LS 56500-2923679.80 INJ 525140 1/42007 9312 SBHP 55 2763 1,972 4,000 0.360 2,417 OB MPS07SS 5650629230-79-81 INJ 525140 1/42007 1992 SBHP 50 2458 1,629 4,000 0.412 2,264 OA MPS -08 56500-29231-68-00 PROD 525140 2/8/2007 3312 PP 80 3779 1,170 4,000 0.299 1,236 NB MPS -08 50.500-29231-68-00 PROD 525140 9/32007 336 PP 3707 1,084 4,000 0.327 1,180 N MPS-11LS 56500-2923692-00 INJ 525140 7/512007 2184 SBHP 82 4008 1,769 4,000 0.404 1,766 OA MPS-11SS 56500-2923692-81 INJ 525140 3/22007 313 SBHP 78 3926 1,965 4,000 0.400 1,995 NB MPSIISS 565062923692-00 INJ 525140 7/42007 2160 SBHP 79 3926 1,741 4,000 0.440 1,774 NB MPS73LS 56500-2923693-80 INJ 525140 3/142007 12000 SBHP 87 4170 1,479 4,000 0.558 1,384 OB MPS-13SS 565062923693.81 INJ 525140 31142007 15455 SBHP 84 4121 1,459 4,000 0.404 1,410 OA MPS -14 5650629231-62-00 INJ 525140 1/5/2007 2424 SBHP 81 3752 1,845 4,000 0.440 1,954 1 NB MPS -17 5650629231-15.00 IPROD 525140 10/2/2007 288 SBHP 85 4092 1,008 4,000 0.445 967 OA+OB MPS18LS 56500-29231-33-80 INJ 525140 3/15/2007 559 SBHP 71 3947 1,889 4,000 0.238 1,902 OB MPS -19A 56500.29231-21-01 PROD 525140 3/242007 4320 SBHP 4210 1,573 41,000 0.587 1,451 OA MPS-20LS 5650629231-32-80 INJ 525140 2/122007 1196 SBHP 95 4119 1,875 4,000 0.438 1,823 OA+OB MPS -23 56500-2923698-00 PROD 525140 &212007 7224 PP 3993 1,530 4,000 0.571 1,526 OA+OB MPS -24 56500-29231-42-00 PROD 525140 2/8/2007 3312 1PP 76 3883 1,727 4,000 0.436 1,778 NB MPS -24 50-50D-29231-42-00 PROD 525140 1024/2007 288 IPP 3811 1,645 4,000 0.269 1,696 NB MPS -25 66500-29230-89-00 PROD 525140 3/30/2007 14320 ISBHP 179 3973 1,417 4,000 0.444 1,429 OA+OB Exhibit 3-F Static Pressure Data Schrader Bluff Pool 8. Well Name and Number: 9. API Number M 10. Oil (0) or Gas xxx-xxxxx-xx-xx (G) 11. AOGCC 12. Final Test Pool Cope Date 13. Sher -In Time, Hours 14. Press. Sum, 15. B.H. Type (see Temp. Instructions for capes) 16, Depth 17. Final 18. Datum Tool Woes Observer) Woos Pressure at (input) Tool Depth 19. Pressure Gradient, ps0a. 20. Comments Pressure at Datum (cal) Zone MPS -25 50-500-29230-89-00 PROD 525140 8/22/2007 72 SBHP 82 3973 1,185 4,000 0.444 1,197 OA+OB MPS-26LS 50-500-29231-50-80 MJ 525140 2/12/2007 456 SBHP 88 4063 2,165 4,000 0.318 2,145 OB MPS -2633 60-500-29231-50-81 INJ 525140 2/13/2007 552 SBHP 82 4004 1,805 4,000 0.451 1,803 OA MPS -27 60-500-29230-8400 PROD 525140 4/17/2007 5160 PP 3865 1,276 4,000 0.214 1,305 OA+OB MPS -28 50-500.29231-58-00 PROD 525140 4/4/2007 4680 PP 3823 1,682 4,000 0.254 1,727 N MPS -28 50-500-29231-58-00 PROD 525140 10/1/2007 984 PP 4259 1,609 4,000 0.174 1,654 N MPS -29 50-500-29231-19-00 PROD 525140 4/8/2007 4320 SBHP 82 4098 1,298 4,000 0.429 1,256 OA+OB MPS-30LS 50-500-29231-31-80 INJ 525140 3/1/2007 223 SBHP 77 3987 1,750 4,000 0.442 1,756 OB MPS -31 5G-500-29230-66-00 INJ 525140 1/6/2007 2448 SBHP 68 3385 1,397 4,000 0.387 1,635 NB+OA+OB MPS -32 50-500-29231-57-00 PROD 525140 3/27/2007 4660 PP 3753 1,584 4,000 0.307 1,660 N MPS -32 50-500-29231-57-00 PROD 525140 9/15/2007 600 PP 3825 1,487 4,000 0.434 1,563 N MPS-33ALS 50-500-29231-23-82 ]NU 525140 2/20/2007 SBHP 81 4076 1,465 4,000 0.318 1,441 OB MPS-33ASS 50-500-29231-23-83 INJ 525140 2/19/2007 SBHP 80 4021 1,623 4,000 0.473 1,613 OA MPS -34 50-500-29231-71-00 PROD 525140 10/21/2007 9480 PP 3996 1,325 4,000 0.515 1,327 N+OA MPS -35 50-500-29231-75-00 PROD 525140 9/10/2007 6096 PP 3629 1,130 4,000 0.433 1,204 N Averam 1,655 21. All tests reported herein were made in accordance with Me applicable rules, re ulaons and instructions of the Alaska 011 and Go Conaervatlon Commission. I hamory.muty that the foregoing is true and correct to the best of my knowledge. signature Tide M ScA,r �_ A 1VI__ _ M^� � Printed Name / l- Dale zrc FL Fluid Level PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP Shut -In Bottom Hole Pressure Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPB-02 1/1/07 1044 31 H2O 8,015 259 MPB-02 2/1/07 1057 18 H2O 4,629 257 MPB-02 3/1/07 992 28 H2O 7,302 261 MPB-02 4/1/07 1081 30 H2O 7,948 265 MPB-02 5/1/07 1182 31 H2O 11,165 360 MPB-02 6/1/07 1075 30 H2O 6,926 231 MPB-02 7/1/07 1026 31 H2O 7,181 232 MPB-02 8/1/07 1076 25 H2O 5,602 224 MPB-02 9/1/07 1002 30 H2O 7,237 241 MPB-02 10/1/07 1033 31 H2O 7,449 240 MPB-02 11/1/07 1072 30 H2O 7,769 259 MPB-02 12/1/07 1054 31 H2O 9,876 319 MPB-27 1/1/07 992 31 H2O 19,274 622 MPB-27 2/1/07 987 28 H2O 15,987 571 MPB-27 3/1/07 1008 31 H2O 14,448 466 MPB-27 4/1/07 1076 30 H2O 19,653 655 MPB-27 5/1/07 1243 31 H2O 20,574 664 MPB-27 6/1/07 1136 30 H2O 16,742 558 MPB-27 7/1/07 1143 31 H2O 16,983 548 MPB-27 8/1/07 1225 25 H2O 14,883 595 MPB-27 9/1/07 1213 30 H2O 15,241 508 MPB-27 10/1/07 1238 31 H2O 17,511 565 MPB-27 11/1/07 1171 30 H2O 16,710 557 MPB-27 12/1/07 1149 31 H2O 19,458 628 MPE-12 1/1/07 1033 31 H2O 8,524 275 MPE-12 2/1/07 920 28 H2O 11,016 393 MPE-12 3/1/07 1050 31 H2O 14,978 483 MPE-12 4/1/07 1038 30 H2O 18,287 610 MPE-12 5/1/07 977 31 H2O 9,387 303 MPE-12 6/1/07 989 30 H2O 11,825 394 MPE-12 7/1/07 1053 31 H2O 14,172 457 MPE-12 8/1/07 978 19 H2O 5,407 285 MPE-12 9/1/07 912 29 H2O 10,820 373 MPE-12 10/1/07 1024 31 H2O 10,530 340 MPE-12 11/1/07 1336 27 H2O 20,917 775 MPE-12 12/1/07 1271 31 H2O 23,960 773 MPE-13B 1/1/07 1180 31 H2O 29,075 938 MPE-13B 2/1/07 950 28 H2O 16,930 605 MPE-13B 3/1/07 1070 31 H2O 24,413 788 MPE-13B 4/1/07 1112 30 H2O 21,092 703 MPE-13B 5/1/07 1065 31 H2O 19,580 632 MPE-13B 6/1/07 1105 30 H2O 27,278 909 MPE-13B 7/1/07 1170 31 H2O 29,737 959 MPE-13B 8/1/07 1092 19 H2O 16,295 858 MPE-13B 9/1/07 1159 29 H2O 30,232 1042 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPE-13B 10/1/07 1059 31 H2O 25,890 835 MPE-13B 11/1/07 1062 30 H2O 30,708 1024 MPE-13B 12/1/07 1138 31 H2O 43,840 1414 MPE-25A 1/1/07 1150 31 H2O 9,749 314 MPE-25A 2/1/07 1102 28 H2O 9,476 338 MPE-25A 3/1/07 1172 31 H2O 9,553 308 MPE-25A 4/1/07 1174 30 H2O 6,881 229 MPE-25A 5/1/07 1292 31 H2O 14,728 475 MPE-25A 6/1/07 1352 30 H2O 17,712 590 MPE-25A 7/1/07 1257 31 H2O 8,996 290 MPE-25A 8/1/07 1225 19 H2O 4,662 245 MPE-25A 9/1/07 1798 4 GAS 847 212 MPE-25A 9/1/07 1330 16 H2O 6,586 412 MPE-25A 10/1/07 2677 31 GAS 19,410 626 MPE-25A 11/1/07 2574 30 GAS 15,553 518 MPE-25A 12/1/07 2586 6 GAS 3,842 640 MPE-25A 12/1/07 1335 23 H2O 10,489 456 MPE-29 1/1/07 718 31 H2O 13,342 430 MPE-29 2/1/07 716 28 H2O 15,020 536 MPE-29 3/1/07 855 31 H2O 20,893 674 MPE-29 4/1/07 618 30 H2O 7,172 239 MPE-29 5/1/07 608 3 H2O 1,022 341 MPE-29 6/1/07 0 H2O 0 MPE-29 7/1/07 0 H2O 0 MPE-29 8/1/07 0 H2O 0 MPE-29 9/1/07 1458 3 GAS 1,208 403 MPE-29 9/1/07 709 17 H2O 11,239 661 MPE-29 10/1/07 0 GAS 0 MPE-29 10/1/07 0 H2O 0 MPE-29 11/1/07 1111 2 GAS 722 361 MPE-29 12/1/07 1761 31 GAS 22,082 712 MPG -01 1/1/07 1052 29 H2O 16,392 565 MPG -01 2/1/07 0 H2O 0 MPG -01 3/1/07 1013 7 H2O 3,470 496 MPG -01 4/1/07 1033 30 H2O 17,253 575 MPG -01 5/1/07 1059 31 H2O 18,275 590 MPG -01 6/1/07 1062 30 H2O 18,613 620 MPG -01 7/1/07 967 31 H2O 11,936 385 MPG -01 8/1/07 993 22 H2O 10,896 495 MPG -01 9/1/07 1002 30 H2O 17,264 575 MPG -01 10/1/07 1024 31 H2O 18,980 612 MPG -01 11/1/07 1002 30 H2O 15,295 510 MPG -01 12/1/07 974 31 H2O 12,636 408 MPG -03A 1/1/07 918 30 H2O 18,900 630 MPG -03A 2/1/07 0 H2O 0 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPG -03A 3/1/07 0 H2O 0 MPG -03A 4/1/07 1061 12 H2O 13,415 1118 MPG -03A 5/1/07 1096 15 H2O 20,225 1348 MPG -03A 6/1/07 0 H2O 0 MPG -03A 7/1/07 0 H2O 0 MPG -03A 8/1/07 1674 6 H2O 1,280 213 MPG -03A 9/1/07 0 H2O 0 MPG -03A 10/1/07 1517 29 H2O 6,223 215 MPG -03A 11/1/07 1617 30 H2O 7,365 246 MPG -03A 12/1/07 1414 31 H2O 4,994 161 MPG -05 1/1/07 0 H2O 0 MPG -05 2/1/07 0 H2O 0 MPG -05 3/1/07 0 H2O 0 MPG -05 4/1/07 0 H2O 0 MPG -05 5/1/07 0 H2O 0 MPG -05 6/1/07 0 H2O 0 MPG -05 7/1/07 0 H2O 0 MPG -05 8/1/07 0 H2O 0 MPG -05 9/1/07 0 H2O 0 MPG -05 10/1/07 0 H2O 0 MPG -05 11/1/07 0 H2O 0 MPG -05 12/1/07 0 H2O 0 MPG -07 1/1/07 0 H2O 0 MPG -07 2/1/07 0 H2O 0 MPG -07 3/1/07 0 H2O 0 MPG -07 4/1/07 0 H2O 0 MPG -07 5/1/07 0 H2O 0 MPG -07 6/1/07 0 H2O 0 MPG -07 7/1/07 0 H2O 0 MPG -07 8/1/07 0 H2O 0 MPG -07 9/1/07 1972 2 H2O 1,192 596 MPG -07 10/1/07 1327 26 H2O 13,998 538 MPG -07 11/1/07 1129 30 H2O 40,954 1365 MPG -07 12/1/07 1115 31 H2O 40,263 1299 MPG -09 1/1/07 622 29 H2O 11,345 391 MPG -09 2/1/07 0 H2O 0 MPG -09 3/1/07 603 7 H2O 4,039 577 MPG -09 4/1/07 648 30 H2O 16,686 556 MPG -09 5/1/07 567 18 H2O 8,018 445 MPG -09 6/1/07 622 30 H2O 13,586 453 MPG -09 7/1/07 660 31 H2O 17,154 553 MPG -09 8/1/07 677 22 H2O 12,851 584 MPG -09 9/1/07 651 27 H2O 14,069 521 MPG -09 10/1/07 670 30 H2O 17,095 570 MPG -09 11/1/07 675 30 H2O 20,138 671 Exhibit 3-13 Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPG -09 12/1/07 655 31 H2O 15,373 496 MPG -10 1/1/07 879 30 H2O 22,918 764 MPG -10 2/1/07 0 H2O 0 MPG -10 3/1/07 821 7 H2O 7,057 1008 MPG -10 4/1/07 922 30 H2O 29,902 997 MPG -10 5/1/07 920 31 H2O 33,621 1085 MPG -10 6/1/07 902 30 H2O 28,829 961 MPG -10 7/1/07 885 31 H2O 29,202 942 MPG -10 8/1/07 914 22 H2O 23,842 1084 MPG -10 9/1/07 844 30 H2O 28,119 937 MPG -10 10/1/07 879 31 H2O 30,667 989 MPG -10 11/1/07 928 30 H2O 32,370 1079 MPG -10 12/1/07 924 31 H2O 32,137 1037 MPG -13 1/1/07 1265 30 H2O 18,630 621 MPG -13 2/1/07 0 H2O 0 MPG -13 3/1/07 1141 7 H2O 4,696 671 MPG -13 4/1/07 1142 30 H2O 22,612 754 MPG -13 5/1/07 1258 31 H2O 37,819 1220 MPG -13 6/1/07 1301 30 H2O 26,026 868 MPG -13 7/1/07 1248 31 H2O 16,368 528 MPG -13 8/1/07 1273 23 H2O 22,436 975 MPG -13 9/1/07 1347 30 H2O 33,765 1126 MPG -13 10/1/07 1329 31 H2O 23,480 757 MPG -13 11/1/07 1324 30 H2O 23,945 798 MPG -13 12/1/07 1312 31 H2O 20,523 662 MPG -17 1/1/07 0 H2O 0 MPG -17 2/1/07 0 H2O 0 MPG -17 3/1/07 0 H2O 0 MPG -17 4/1/07 0 H2O 0 MPG -17 5/1/07 1148 23 H2O 17,271 751 MPG -17 6/1/07 1303 30 H2O 22,315 744 MPG -17 7/1/07 1382 31 H2O 17,137 553 MPG -17 8/1/07 1355 23 H2O 8,716 379 MPG -17 9/1/07 1261 30 H2O 12,295 410 MPG -17 10/1/07 1235 31 H2O 16,914 546 MPG -17 11/1/07 1343 30 H2O 27,539 918 MPG -17 12/1/07 1318 31 H2O 23,870 770 MPG -19 1/1/07 702 3 H2O 413 138 MPG -19 2/1/07 0 H2O 0 MPG -19 3/1/07 781 3 H2O 829 276 MPG -19 4/1/07 1202 30 H2O 10,306 344 MPG -19 5/1/07 1109 31 H2O 15,397 497 MPG -19 6/1/07 1034 30 H2O 17,915 597 MPG -19 7/1/07 1163 31 H2O 25,825 833 MPG -19 8/1/07 1381 19 H2O 10,273 541 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPG -19 9/1/07 1115 30 H2O 15,295 510 MPG -19 10/1/07 1148 30 H2O 15,468 516 MPG -19 11/1/07 1309 22 H2O 17,767 808 MPG -19 12/1/07 1191 31 H2O 30,295 977 MPH -11 1/1/07 814 14 H2O 6,826 488 MPH -11 2/1/07 781 6 H2O 2,774 462 MPH -11 3/1/07 0 H2O 0 MPH -11 4/1/07 0 H2O 0 MPH -11 5/1/07 0 H2O 0 MPH -11 6/1/07 0 H2O 0 MPH -11 7/1/07 0 H2O 0 MPH -11 8/1/07 0 H2O 0 MPH -11 9/1/07 0 H2O 0 MPH -11 10/1/07 0 H2O 0 MPH -11 11/1/07 595 1 H2O 456 456 MPH -11 12/1/07 650 31 H2O 20,405 658 MPH -12 1/1/07 960 14 H2O 8,242 589 MPH -12 2/1/07 978 25 H2O 15,991 640 MPH -12 3/1/07 705 7 H2O 1,797 257 MPH -12 4/1/07 799 30 H2O 9,561 319 MPH -12 5/1/07 850 18 H2O 7,707 428 MPH -12 6/1/07 876 30 H2O 11,638 388 MPH -12 7/1/07 882 31 H2O 13,005 420 MPH -12 8/1/07 907 22 H2O 12,182 554 MPH -12 9/1/07 776 30 H2O 6,315 211 MPH -12 10/1/07 760 31 H2O 4,980 161 MPH -12 11/1/07 779 30 H2O 6,503 217 MPH -12 12/1/07 781 31 H2O 5,557 179 MPH -15 1/1/07 1404 28 H2O 24,583 878 MPH -15 2/1/07 1468 8 H2O 6,440 805 MPH -15 3/1/07 1432 7 H2O 6,337 905 MPH -15 4/1/07 1455 17 H2O 14,949 879 MPH -15 5/1/07 1471 30 H2O 27,201 907 MPH -15 6/1/07 1461 30 H2O 25,546 852 MPH -15 7/1/07 1455 31 H2O 27,543 888 MPH -15 8/1/07 1429 22 H2O 17,806 809 MPH -15 9/1/07 1347 30 H2O 25,428 848 MPH -15 10/1/07 1459 31 H2O 31,443 1014 MPH -15 11/1/07 1430 30 H2O 30,565 1019 MPH -15 12/1/07 1380 31 H2O 31,557 1018 MPH -17 9/1/07 424 27 H2O 28,523 1056 MPH -17 10/1/07 993 31 H2O 30,849 995 MPH -17 11/1/07 1071 30 H2O 32,854 1095 MPH -17 12/1/07 1113 31 H2O 38,913 1255 MPI -02 1/1/07 1124 31 H2O 25,497 822 Exhibit 3-13 Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPI -02 2/1/07 1166 28 H2O 28,125 1004 MPI -02 3/1/07 707 5 H2O 3,451 690 MPI -02 4/1/07 1012 30 H2O 26,120 871 MPI -02 5/1/07 1092 31 H2O 31,538 1017 MPI -02 6/1/07 1070 30 H2O 24,158 805 MPI -02 7/1/07 1064 31 H2O 24,167 780 MPI -02 8/1/07 1154 23 H2O 17,084 743 MPI -02 9/1/07 1085 30 H2O 23,563 785 MPI -02 10/1/07 1082 31 H2O 20,451 660 MPI -02 11/1/07 1120 30 H2O 22,840 761 MPI -02 12/1/07 1084 31 H2O 18,052 582 MPI -05 1/1/07 909 31 H2O 15,678 506 MPI -05 2/1/07 920 25 H2O 13,022 521 MPI -05 3/1/07 0 H2O 0 MPI -05 4/1/07 0 H2O 0 MPI -05 5/1/07 0 H2O 0 MPI -05 6/1/07 900 17 H2O 6,672 392 MPI -05 7/1/07 879 31 H2O 12,562 405 MPI -05 8/1/07 858 22 H2O 9,256 421 MPI -05 9/1/07 878 30 H2O 18,034 601 MPI -05 10/1/07 875 31 H2O 21,072 680 MPI -05 11/1/07 868 30 H2O 19,008 634 MPI -05 12/1/07 851 31 H2O 17,828 575 MPI -08 1/1/07 1533 31 H2O 31,114 1004 MPI -08 2/1/07 1476 28 H2O 49,502 1768 MPI -08 3/1/07 672 2 H2O 2,983 1492 MPI -08 4/1/07 0 H2O 0 MPI -08 5/1/07 0 6 H2O 6,573 1096 MPI -08 6/1/07 970 19 H2O 25,837 1360 MPI -08 7/1/07 1249 31 H2O 48,642 1569 MPI -08 8/1/07 1149 22 H2O 31,639 1438 MPI -08 9/1/07 1055 30 H2O 41,400 1380 MPI -08 10/1/07 1125 31 H2O 45,159 1457 MPI -08 11/1/07 1142 30 H2O 42,452 1415 MPI -08 12/1/07 1126 31 H2O 42,563 1373 MPI -09 1/1/07 1442 29 H2O 32,877 1134 MPI -09 2/1/07 1360 28 H2O 24,044 859 MPI -09 3/1/07 0 1 H2O 1,340 1340 MPI -09 4/1/07 1503 26 H2O 36,524 1405 MPI -09 5/1/07 1384 31 H2O 44,656 1441 MPI -09 6/1/07 1455 30 H2O 42,366 1412 MPI -09 7/1/07 1399 31 H2O 46,334 1495 MPI -09 8/1/07 1373 22 H2O 29,249 1330 MPI -09 9/1/07 1382 30 H2O 43,595 1453 MPI -09 10/1/07 1444 31 H2O 46,668 1505 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPI -09 11/1/07 1427 30 H2O 45,175 1506 MPI -09 12/1/07 1378 31 H2O 43,920 1417 MPI -10 1/1/07 876 31 H2O 48,023 1549 MPI -10 2/1/07 824 28 H2O 43,019 1536 MPI -10 3/1/07 518 4 H2O 4,041 1010 MPI -10 4/1/07 0 H2O 0 MPI -10 5/1/07 644 25 H2O 22,072 883 MPI -10 6/1/07 779 30 H2O 38,735 1291 MPI -10 7/1/07 910 31 H2O 48,151 1553 MPI -10 8/1/07 939 22 H2O 31,438 1429 MPI -10 9/1/07 919 30 H2O 46,077 1536 MPI -10 10/1/07 940 31 H2O 45,954 1482 MPI -10 11/1/07 920 30 H2O 42,784 1426 MPI -10 12/1/07 945 31 H2O 45,436 1466 MPI -16 1/1/07 1226 31 H2O 50,177 1619 MPI -16 2/1/07 1117 28 H2O 38,710 1383 MPI -16 3/1/07 733 5 H2O 5,278 1056 MPI -16 4/1/07 1103 30 H2O 43,184 1439 MPI -16 5/1/07 1132 27 H2O 35,880 1329 MPI -16 6/1/07 1082 9 H2O 7,072 786 MPI -16 7/1/07 0 H2O 0 MPI -16 8/1/07 1021 21 H2O 25,784 1228 MPI -16 9/1/07 1056 30 H2O 40,727 1358 MPI -16 10/1/07 1110 31 H2O 42,931 1385 MPI -16 11/1/07 1059 30 H2O 35,479 1183 MPI -16 12/1/07 1089 31 H2O 40,483 1306 MPJ -02 1/1/07 1083 31 H2O 19,722 636 MPJ -02 2/1/07 1041 25 H2O 12,841 514 MPJ -02 3/1/07 1063 7 H2O 2,785 398 MPJ -02 4/1/07 994 30 H2O 13,582 453 MPJ -02 5/1/07 1024 31 H2O 16,138 521 MPJ -02 6/1/07 1030 30 H2O 15,341 511 MPJ -02 7/1/07 1059 31 H2O 15,719 507 MPJ -02 8/1/07 1015 22 H2O 7,488 340 MPJ -02 9/1/07 1039 30 H2O 14,301 477 MPJ -02 10/1/07 1053 31 H2O 16,279 525 MPJ -02 11/1/07 1026 30 H2O 13,837 461 MPJ -02 12/1/07 1030 31 H2O 15,503 500 MPJ -15 1/1/07 979 30 H2O 31,107 1037 MPJ -15 2/1/07 910 28 H2O 27,832 994 MPJ -15 3/1/07 939 10 H2O 9,420 942 MPJ -15 4/1/07 945 30 H2O 32,879 1096 MPJ -15 5/1/07 1000 31 H2O 33,744 1089 MPJ -15 6/1/07 1018 30 H2O 32,661 1089 MPJ -15 7/1/07 1001 31 H2O 30,269 976 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPJ -15 8/1/07 959 22 H2O 17,704 805 MPJ -15 9/1/07 963 30 H2O 32,731 1091 MPJ -15 10/1/07 905 31 H2O 25,579 825 MPJ -15 11/1/07 989 30 H2O 31,686 1056 MPJ -15 12/1/07 993 31 H2O 33,188 1071 MPJ -17 1/1/07 1117 31 H2O 51,049 1647 MPJ -17 2/1/07 1161 26 H2O 30,671 1180 MPJ -17 3/1/07 1297 8 H2O 5,705 713 MPJ -17 4/1/07 1072 8 H2O 7,687 961 MPJ -17 5/1/07 1106 31 H2O 35,157 1134 MPJ -17 6/1/07 1239 30 H2O 35,666 1189 MPJ -17 7/1/07 1327 31 H2O 37,779 1219 MPJ -17 8/1/07 980 22 H2O 17,175 781 MPJ -17 9/1/07 1057 30 H2O 29,940 998 MPJ -17 10/1/07 986 31 H2O 29,236 943 MPJ -17 11/1/07 1585 30 H2O 29,639 988 MPJ -17 12/1/07 986 31 H2O 29,601 955 MPJ -18 1/1/07 1483 31 H2O 34,009 1097 MPJ -18 2/1/07 1270 28 H2O 26,929 962 MPJ -18 3/1/07 1407 10 H2O 9,609 961 MPJ -18 4/1/07 1490 30 H2O 33,959 1132 MPJ -18 5/1/07 1455 31 H2O 37,279 1203 MPJ -18 6/1/07 1503 30 H2O 37,099 1237 MPJ -18 7/1/07 1487 31 H2O 39,898 1287 MPJ -18 8/1/07 1592 21 H2O 28,165 1341 MPJ -18 9/1/07 1417 30 H2O 39,202 1307 MPJ -18 10/1/07 1424 31 H2O 39,874 1286 MPJ -18 11/1/07 1614 30 H2O 36,823 1227 MPJ -18 12/1/07 1580 31 H2O 38,423 1239 MPJ -20A 1/1/07 443 31 H2O 31,013 1000 MPJ -20A 2/1/07 294 28 H2O 34,038 1216 MPJ -20A 3/1/07 365 11 H2O 12,599 1145 MPJ -20A 4/1/07 466 22 H2O 24,803 1127 MPJ -20A 5/1/07 0 H2O 0 MPJ -20A 6/1/07 0 H2O 0 MPJ -20A 7/1/07 0 H2O 0 MPJ -20A 8/1/07 0 H2O 0 MPJ -20A 9/1/07 0 H2O 0 MPJ -20A 10/1/07 0 H2O 0 MPJ -20A 11/1/07 232 19 H2O 16,707 879 MPJ -20A 12/1/07 262 31 H2O 24,473 789 MPS -02 1/1/07 1107 22 H2O 30,625 1392 MPS -02 2/1/07 1018 16 H2O 25,061 1566 MPS -02 3/1/07 1093 30 H2O 48,538 1618 MPS -02 4/1/07 1078 30 H2O 51,872 1729 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPS -02 5/1/07 979 31 H2O 57,556 1857 MPS -02 6/1/07 897 30 H2O 52,535 1751 MPS -02 7/1/07 935 31 H2O 55,189 1780 MPS -02 8/1/07 975 18 H2O 33,431 1857 MPS -02 9/1/07 965 28 H2O 52,306 1868 MPS -02 10/1/07 975 31 H2O 58,914 1900 MPS -02 11/1/07 927 30 H2O 55,521 1851 MPS -02 12/1/07 985 30 H2O 69,338 2311 MPS -06 1/1/07 0 H2O 0 MPS -06 2/1/07 0 H2O 0 MPS -06 3/1/07 1124 11 H2O 8,808 801 MPS -06 4/1/07 1264 30 H2O 23,949 798 MPS -06 5/1/07 1258 31 H2O 25,919 836 MPS -06 6/1/07 1230 30 H2O 21,501 717 MPS -06 7/1/07 1180 31 H2O 20,352 657 MPS -06 8/1/07 1218 18 H2O 14,104 784 MPS -06 9/1/07 1193 28 H2O 20,639 737 MPS -06 10/1/07 1234 31 H2O 24,928 804 MPS -06 11/1/07 1186 30 H2O 27,774 926 MPS -06 12/1/07 1237 31 H2O 31,432 1014 MPS -07 1/1/07 0 H2O 0 MPS -07 2/1/07 0 H2O 0 MPS -07 3/1/07 0 H2O 0 MPS -07 4/1/07 0 H2O 0 MPS -07 5/1/07 0 H2O 0 MPS -07 6/1/07 0 H2O 0 MPS -07 7/1/07 0 H2O 0 MPS -07 8/1/07 0 H2O 0 MPS -07 9/1/07 881 1 H2O 520 520 MPS -07 10/1/07 1167 31 H2O 29,984 967 MPS -07 11/1/07 1346 30 H2O 33,384 1113 MPS -07 12/1/07 1428 31 H2O 28,908 933 MPS -09 1/1/07 1268 15 H2O 7,400 493 MPS -09 2/1/07 1010 11 H2O 5,288 481 MPS -09 3/1/07 1131 16 H2O 14,596 912 MPS -09 4/1/07 1357 30 H2O 24,415 814 MPS -09 5/1/07 1439 31 H2O 16,531 533 MPS -09 6/1/07 1469 30 H2O 15,946 532 MPS -09 7/1/07 1411 31 H2O 16,949 547 MPS -09 8/1/07 1436 19 H2O 11,310 595 MPS -09 9/1/07 1386 29 H2O 15,820 546 MPS -09 10/1/07 1418 31 H2O 18,176 586 MPS -09 11/1/07 1422 30 H2O 21,098 703 MPS -09 12/1/07 1420 31 H2O 20,615 665 MPS -10A 1/1/07 442 31 H2O 17,207 555 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPS -10A 2/1/07 443 26 H2O 13,731 528 MPS -10A 3/1/07 551 30 H2O 37,274 1242 MPS -10A 4/1/07 726 30 H2O 82,170 2739 MPS -10A 5/1/07 302 31 H2O 40,798 1316 MPS -10A 6/1/07 483 28 H2O 26,817 958 MPS -10A 7/1/07 748 31 H2O 21,007 678 MPS -10A 8/1/07 712 19 H2O 9,623 506 MPS -10A 9/1/07 745 23 H2O 15,690 682 MPS -10A 10/1/07 774 29 H2O 24,024 828 MPS -10A 11/1/07 766 30 H2O 25,025 834 MPS -10A 12/1/07 745 31 H2O 27,655 892 MPS -11 1/1/07 1357 31 H2O 11,844 382 MPS -11 2/1/07 1330 16 H2O 5,462 341 MPS -11 3/1/07 1197 11 H2O 12,476 1134 MPS -11 4/1/07 1191 6 H2O 6,533 1089 MPS -11 5/1/07 0 H2O 0 MPS -11 6/1/07 0 H2O 0 MPS -11 7/1/07 0 H2O 0 MPS -11 8/1/07 0 H2O 0 MPS -11 9/1/07 0 H2O 0 MPS -11 10/1/07 0 H2O 0 MPS -11 11/1/07 0 H2O 0 MPS -11 12/1/07 0 H2O 0 MPS -13 1/1/07 0 H2O 0 MPS -13 2/1/07 0 H2O 0 MPS -13 3/1/07 0 H2O 0 MPS -13 4/1/07 0 H2O 0 MPS -13 5/1/07 0 H2O 0 MPS -13 6/1/07 0 H2O 0 MPS -13 7/1/07 0 H2O 0 MPS -13 8/1/07 0 H2O 0 MPS -13 9/1/07 0 H2O 0 MPS -13 10/1/07 0 2 H2O 359 180 MPS -13 11/1/07 0 H2O 0 MPS -13 12/1/07 0 H2O 0 MPS -14 1/1/07 0 H2O 0 MPS -14 2/1/07 0 H2O 0 MPS -14 3/1/07 983 11 H2O 5,381 489 MPS -14 4/1/07 1120 30 H2O 16,850 562 MPS -14 5/1/07 1094 31 H2O 16,492 532 MPS -14 6/1/07 1095 30 H2O 16,917 564 MPS -14 7/1/07 1039 31 H2O 15,342 495 MPS -14 8/1/07 1075 18 H2O 11,328 629 MPS -14 9/1/07 1022 29 H2O 15,875 547 MPS -14 10/1/07 1097 31 H2O 19,164 618 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPS -14 11/1/07 1077 30 H2O 22,482 749 MPS -14 12/1/07 1041 31 H2O 19,408 626 MPS -15 1/1/07 0 H2O 0 MPS -15 2/1/07 0 H2O 0 MPS -15 3/1/07 0 H2O 0 MPS -15 4/1/07 0 H2O 0 MPS -15 5/1/07 0 H2O 0 MPS -15 6/1/07 0 H2O 0 MPS -15 7/1/07 0 H2O 0 MPS -15 8/1/07 0 H2O 0 MPS -15 9/1/07 0 H2O 0 MPS -15 10/1/07 0 H2O 0 MPS -15 11/1/07 0 H2O 0 MPS -15 12/1/07 0 H2O 0 MPS -16 1/1/07 0 H2O 0 MPS -16 2/1/07 0 H2O 0 MPS -16 3/1/07 766 11 H2O 6,206 564 MPS -16 4/1/07 738 30 H2O 17,922 597 MPS -16 5/1/07 760 31 H2O 23,223 749 MPS -16 6/1/07 732 30 H2O 19,259 642 MPS -16 7/1/07 721 31 H2O 17,829 575 MPS -16 8/1/07 712 19 H2O 10,294 542 MPS -16 9/1/07 751 29 H2O 19,822 684 MPS -16 10/1/07 776 31 H2O 21,574 696 MPS -16 11/1/07 884 30 H2O 30,023 1001 MPS -16 12/1/07 863 31 H2O 26,333 849 MPS -18 1/1/07 1048 31 H2O 27,580 890 MPS -18 2/1/07 1080 26 H2O 22,244 856 MPS -18 3/1/07 1016 30 H2O 21,942 731 MPS -18 4/1/07 1149 30 H2O 31,840 1061 MPS -18 5/1/07 1117 31 H2O 35,368 1141 MPS -18 6/1/07 1124 30 H2O 35,420 1181 MPS -18 7/1/07 1096 31 H2O 35,724 1152 MPS -18 8/1/07 1122 19 H2O 23,516 1238 MPS -18 9/1/07 1053 29 H2O 34,570 1192 MPS -18 10/1/07 1129 31 H2O 40,996 1322 MPS -18 11/1/07 1086 30 H2O 43,098 1437 MPS -18 12/1/07 951 31 H2O 40,440 1305 MPS -20 1/1/07 548 8 H2O 7,031 879 MPS -20 2/1/07 0 H2O 0 MPS -20 3/1/07 896 11 H2O 16,578 1507 MPS -20 4/1/07 989 30 H2O 21,563 719 MPS -20 5/1/07 1001 31 H2O 17,330 559 MPS -20 6/1/07 1032 30 H2O 16,613 554 MPS -20 7/1/07 1022 31 H2O 16,829 543 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPS -20 8/1/07 1052 19 H2O 10,884 573 MPS -20 9/1/07 1007 29 H2O 19,577 675 MPS -20 10/1/07 1084 31 H2O 46,432 1498 MPS -20 11/1/07 1041 30 H2O 49,707 1657 MPS -20 12/1/07 1057 31 H2O 55,759 1799 MPS -21 1/1/07 0 H2O 0 MPS -21 2/1/07 0 H2O 0 MPS -21 3/1/07 0 H2O 0 MPS -21 4/1/07 0 H2O 0 MPS -21 5/1/07 0 H2O 0 MPS -21 6/1/07 0 H2O 0 MPS -21 7/1/07 0 H2O 0 MPS -21 8/1/07 0 H2O 0 MPS -21 9/1/07 0 H2O 0 MPS -21 10/1/07 0 H2O 0 MPS -21 11/1/07 0 H2O 0 MPS -21 12/1/07 0 H2O 0 MPS -26 1/1/07 0 H2O 0 MPS -26 2/1/07 0 H2O 0 MPS -26 3/1/07 979 11 H2O 11,429 1039 MPS -26 4/1/07 1139 30 H2O 31,672 1056 MPS -26 5/1/07 1255 31 H2O 35,890 1158 MPS -26 6/1/07 1233 30 H2O 33,142 1105 MPS -26 7/1/07 1242 31 H2O 36,341 1172 MPS -26 8/1/07 1192 19 H2O 19,234 1012 MPS -26 9/1/07 1095 29 H2O 32,298 1114 MPS -26 10/1/07 1234 31 H2O 37,176 1199 MPS -26 11/1/07 1253 30 H2O 54,605 1820 MPS -26 12/1/07 1258 31 H2O 56,013 1807 MPS -30 1/1/07 992 31 H2O 31,082 1003 MPS -30 2/1/07 799 26 H2O 15,397 592 MPS -30 3/1/07 935 30 H2O 25,467 849 MPS -30 4/1/07 1097 30 H2O 39,494 1316 MPS -30 5/1/07 986 31 H2O 40,798 1316 MPS -30 6/1/07 876 30 H2O 37,741 1258 MPS -30 7/1/07 874 31 H2O 39,246 1266 MPS -30 8/1/07 829 19 H2O 24,046 1266 MPS -30 9/1/07 747 29 H2O 42,370 1461 MPS -30 10/1/07 759 31 H2O 45,979 1483 MPS -30 11/1/07 842 30 H2O 83,879 2796 MPS -30 12/1/07 810 31 H2O 73,910 2384 MPS -31 1/1/07 0 H2O 0 MPS -31 2/1/07 0 H2O 0 MPS -31 3/1/07 725 11 H2O 7,249 659 MPS -31 4/1/07 0 H2O 0 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Days Product Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Code (BBL, MCF) (BBL, MCF) MPS -31 5/1/07 0 H2O 0 MPS -31 6/1/07 0 H2O 0 MPS -31 7/1/07 0 H2O 0 MPS -31 8/1/07 0 H2O 0 MPS -31 9/1/07 0 H2O 0 MPS -31 10/1/07 0 H2O 0 MPS -31 11/1/07 0 H2O 0 MPS -31 12/1/07 0 H2O 0 MPS -33 1/1/07 0 H2O 0 MPS -33 2/1/07 0 0 H2O 0 MPS -33A 3/1/07 943 11 H2O 7,909 719 MPS -33A 4/1/07 930 29 H2O 16,173 558 MPS -33A 5/1/07 1130 31 H2O 10,598 342 MPS -33A 6/1/07 1210 30 H2O 10,963 365 MPS -33A 7/1/07 1225 31 H2O 7,546 243 MPS -33A 8/1/07 1234 19 H2O 5,279 278 MPS -33A 9/1/07 1202 29 H2O 8,365 288 MPS -33A 10/1/07 1306 31 H2O 9,621 310 MPS -33A 11/1/07 1263 30 H2O 8,549 285 MPS -33A 12/1/07 1281 31 H2O 9,922 320 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Milne Point Unit Allocation Factor Report 1/1/2007 - 12/31/2007 Date Oil Water Gas 1/1/2007 0.88 1.35 1.09 1/2/2007 0.88 1.35 1.10 1/3/2007 0.88 1.36 1.08 1/4/2007 0.88 1.39 1.10 1/5/2007 0.87 1.42 1.12 1/6/2007 0.88 1.40 1.14 1/7/2007 0.89 1.37 1.14 1/8/2007 0.87 1.35 1.13 1/9/2007 0.89 1.38 1.10 1/10/2007 0.88 1.40 1.08 1/11/2007 0.88 1.35 1.07 1/12/2007 0.89 1.47 1.12 1/13/2007 0.89 1.47 1.10 1/14/2007 0.89 1.49 1.10 1/15/2007 0.89 1.48 1.10 1/16/2007 0.88 1.49 1.08 1/17/2007 0.86 1.49 1.05 1/18/2007 0.86 1.49 1.15 1/19/2007 0.85 1.51 1.10 1/20/2007 0.91 1.52 1.16 1/21/2007 0.87 1.48 1.15 1/22/2007 0.88 1.44 1.12 1/23/2007 0.88 1.40 1.08 1/24/2007 0.86 1.47 1.06 1/25/2007 0.87 1.48 1.04 1/26/2007 0.87 1.48 1.03 1/27/2007 0.86 1.52 1.02 1/28/2007 0.86 1.55 0.99 1/29/2007 0.88 1.47 1.11 1/30/2007 0.88 1.40 1.14 1/31/2007 0.90 1.36 1.10 2/1/2007 0.88 1.34 1.09 2/2/2007 0.88 1.33 1.06 2/3/2007 0.88 1.37 1.01 2/4/2007 0.89 1.38 1.00 2/5/2007 0.92 1.38 1.00 2/6/2007 0.90 1.40 1.02 2/7/2007 0.91 1.42 1.07 2/8/2007 0.88 1.43 1.07 2/9/2007 0.91 1.44 1.07 2/10/2007 0.91 1.44 1.08 2/11/2007 0.90 1.42 1.08 2/12/2007 0.91 1.38 1.09 2/13/2007 0.89 1.51 1.14 2/14/2007 0.90 1.38 1.11 2/15/2007 0.88 1.39 1.14 2/16/2007 0.90 1.38 1.12 2/17/2007 0.89 1.39 1.13 2/18/2007 0.90 1.58 1.30 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 2/19/2007 0.92 1.43 1.04 2/20/2007 0.91 1.39 1.10 2/21/2007 0.88 1.40 0.99 2/22/2007 0.86 1.41 1.00 2/23/2007 0.86 1.45 1.02 2/24/2007 0.85 1.46 1.01 2/25/2007 0.86 1.43 1.01 2/26/2007 0.85 1.44 1.00 2/27/2007 0.79 1.33 0.90 2/28/2007 0.87 1.43 1.21 3/1/2007 0.88 1.46 1.28 3/2/2007 0.88 1.44 1.24 3/3/2007 0.88 1.49 1.23 3/4/2007 0.88 1.50 1.25 3/5/2007 0.88 1.53 1.27 3/6/2007 0.87 1.53 1.25 3/7/2007 0.87 1.51 1.25 3/8/2007 0.88 1.54 1.37 3/9/2007 0.89 1.55 1.28 3/10/2007 0.88 1.54 1.21 3/11/2007 0.84 1.55 1.22 3/12/2007 0.87 1.48 1.24 3/13/2007 0.86 1.52 1.34 3/14/2007 0.87 1.63 1.41 3/15/2007 0.87 1.56 1.41 3/16/2007 0.86 1.54 1.41 3/17/2007 0.86 1.54 1.37 3/18/2007 0.86 1.54 1.33 3/19/2007 0.85 1.58 1.37 3/20/2007 0.86 1.57 1.37 3/21/2007 0.87 1.57 1.37 3/22/2007 0.85 1.55 1.36 3/23/2007 0.88 1.57 1.37 3/24/2007 0.85 1.60 1.37 3/25/2007 0.86 1.59 1.38 3/26/2007 0.80 1.59 1.37 3/27/2007 0.86 1.60 1.35 3/28/2007 0.95 1.54 1.25 3/29/2007 0.85 1.57 1.18 3/30/2007 0.88 1.48 1.25 3/31/2007 0.85 1.49 1.26 4/1/2007 0.89 1.47 1.11 4/2/2007 0.85 1.47 1.03 4/3/2007 0.84 1.48 1.03 4/4/2007 0.87 1.49 1.09 4/5/2007 0.85 1.47 1.05 4/6/2007 0.86 1.48 1.06 4/7/2007 0.86 1.50 1.04 4/8/2007 0.85 1.46 1.11 4/9/2007 0.82 1.66 1.45 4/10/2007 0.92 1.53 1.16 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 4/11/2007 0.92 1.52 1.14 4/12/2007 0.91 1.47 1.19 4/13/2007 0.89 1.45 1.19 4/14/2007 0.85 1.46 1.24 4/15/2007 0.89 1.39 1.34 4/16/2007 0.86 1.33 1.29 4/17/2007 0.86 1.35 1.28 4/18/2007 0.87 1.46 1.25 4/19/2007 0.88 1.53 1.23 4/20/2007 0.87 1.47 1.22 4/21/2007 0.86 1.45 1.21 4/22/2007 0.87 1.28 1.17 4/23/2007 0.87 1.31 1.17 4/24/2007 0.87 1.37 1.14 4/25/2007 0.88 1.35 1.12 4/26/2007 0.86 1.38 1.17 4/27/2007 0.86 1.37 1.14 4/28/2007 0.86 1.39 1.12 4/29/2007 0.85 1.41 1.14 4/30/2007 0.86 1.43 1.17 5/1/2007 0.85 1.42 1.37 5/2/2007 0.87 1.41 1.16 5/3/2007 0.84 1.33 1.15 5/4/2007 0.93 1.27 1.11 5/5/2007 0.91 1.20 0.93 5/6/2007 0.88 1.24 0.96 5/7/2007 0.88 1.25 0.91 5/8/2007 0.85 1.23 0.92 5/9/2007 0.86 1.19 0.94 5/10/2007 0.86 1.18 0.94 5/11/2007 0.86 1.24 0.95 5/12/2007 0.85 1.21 0.99 5/13/2007 0.87 1.17 1.00 5/14/2007 0.87 1.14 1.00 5/15/2007 0.87 1.08 0.96 5/16/2007 0.90 1.08 1.03 5/17/2007 0.87 1.08 1.03 5/18/2007 0.88 1.08 1.07 5/19/2007 0.89 1.09 1.05 5/20/2007 0.91 1.16 1.07 5/21/2007 0.91 1.12 1.12 5/22/2007 0.93 1.18 1.16 5/23/2007 0.91 1.25 1.14 5/24/2007 0.92 1.23 1.09 5/25/2007 0.90 1.19 1.08 5/26/2007 0.91 1.18 1.09 5/27/2007 0.90 1.19 1.10 5/28/2007 0.91 1.20 1.16 5/29/2007 0.91 1.24 1.18 5/30/2007 0.88 1.25 1.23 5/31/2007 0.86 1.27 1.30 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 6/1/2007 0.91 1.24 1.22 6/2/2007 0.90 1.26 1.14 6/3/2007 0.89 1.24 1.12 6/4/2007 0.88 1.22 1.15 6/5/2007 0.89 1.26 1.17 6/6/2007 0.89 1.33 1.17 6/7/2007 0.89 1.33 1.32 6/8/2007 0.87 1.47 1.16 6/9/2007 0.91 1.34 1.16 6/10/2007 0.91 1.35 1.31 6/11/2007 0.88 1.38 1.18 6/12/2007 0.90 1.36 1.20 6/13/2007 0.89 1.33 1.20 6/14/2007 0.89 1.29 1.18 6/15/2007 0.88 1.29 1.19 6/16/2007 0.88 1.30 1.17 6/17/2007 0.87 1.31 1.14 6/18/2007 0.90 1.27 1.16 6/19/2007 0.89 1.28 1.10 6/20/2007 0.87 1.32 1.03 6/21/2007 0.89 1.33 1.10 6/22/2007 0.89 1.33 1.07 6/23/2007 0.85 1.18 1.22 6/24/2007 0.91 1.19 1.24 6/25/2007 0.91 1.40 1.12 6/26/2007 0.93 1.48 1.11 6/27/2007 0.91 1.48 1.15 6/28/2007 0.89 1.63 1.12 6/29/2007 0.87 1.51 1.05 6/30/2007 0.92 1.46 1.22 7/1/2007 0.90 1.49 1.23 7/2/2007 0.90 1.52 1.22 7/3/2007 0.87 1.50 1.19 7/4/2007 0.89 1.45 1.19 7/5/2007 0.89 1.46 1.18 7/6/2007 0.92 1.48 1.20 7/7/2007 0.91 1.31 1.12 7/8/2007 0.88 1.29 1.14 7/9/2007 0.94 1.30 1.21 7/10/2007 0.92 1.29 1.14 7/11/2007 0.93 1.27 1.13 7/12/2007 0.95 1.27 1.15 7/13/2007 0.93 1.28 1.13 7/14/2007 0.95 1.28 1.01 7/15/2007 0.93 1.26 1.01 7/16/2007 0.94 1.27 1.01 7/17/2007 0.87 1.44 1.08 7/18/2007 0.92 1.47 1.21 7/19/2007 0.93 1.32 1.09 7/20/2007 0.91 1.31 1.06 7/21/2007 0.90 1.29 1.03 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 7/22/2007 0.92 1.32 1.06 7/23/2007 0.94 1.44 1.08 7/24/2007 0.92 1.44 1.11 7/25/2007 0.87 1.64 1.26 7/26/2007 0.91 1.41 1.17 7/27/2007 0.90 1.40 1.10 7/28/2007 0.92 1.41 1.09 7/29/2007 0.89 1.40 1.10 7/30/2007 0.91 1.38 1.12 7/31/2007 0.89 1.40 1.13 8/1/2007 0.88 1.40 1.14 8/2/2007 0.88 1.39 1.13 8/3/2007 0.87 1.36 1.13 8/4/2007 0.90 1.32 1.13 8/5/2007 0.87 1.30 1.10 8/6/2007 0.86 1.48 1.08 8/7/2007 0.85 1.34 1.05 8/8/2007 0.87 1.49 1.09 8/9/2007 0.89 1.48 1.08 8/10/2007 0.84 1.50 1.07 8/11/2007 0.90 1.50 1.10 8/12/2007 0.88 1.52 1.10 8/13/2007 0.88 1.48 1.08 8/14/2007 0.89 1.48 1.09 8/15/2007 0.89 1.48 1.11 8/16/2007 0.89 1.49 1.11 8/17/2007 0.89 1.50 1.11 8/18/2007 0.85 1.48 1.13 8/19/2007 0.88 1.33 1.16 8/20/2007 0.87 1.56 1.04 8/21/2007 0.83 1.48 1.27 8/22/2007 0.89 1.53 1.27 8/23/2007 1.26 2.31 2.06 8/24/2007 0.00 0.00 0.00 8/25/2007 0.00 0.00 0.00 8/26/2007 0.00 0.00 0.00 8/27/2007 0.00 0.00 0.00 8/28/2007 0.00 0.00 0.00 8/29/2007 1.93 2.13 23.94 8/30/2007 0.89 4.04 2.17 8/31/2007 0.93 2.46 1.23 9/1/2007 0.95 1.74 0.92 9/2/2007 0.96 1.59 0.86 9/3/2007 0.93 1.47 0.84 9/4/2007 0.92 1.38 1.08 9/5/2007 0.89 1.33 1.13 9/6/2007 0.88 1.34 1.10 9/7/2007 0.88 1.33 1.12 9/8/2007 0.88 1.37 1.10 9/9/2007 0.89 1.35 1.11 9/10/2007 0.90 1.34 1.00 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 9/11/2007 0.88 1.39 1.19 9/12/2007 0.90 1.36 1.18 9/13/2007 0.89 1.36 1.14 9/14/2007 0.89 1.34 1.13 9/15/2007 0.88 1.26 1.11 9/16/2007 0.88 1.31 1.09 9/17/2007 0.88 1.29 1.01 9/18/2007 0.88 1.30 1.08 9/19/2007 0.87 1.29 1.06 9/20/2007 0.87 1.33 1.04 9/21/2007 0.86 1.20 1.04 9/22/2007 0.87 1.19 1.01 9/23/2007 0.86 1.19 1.01 9/24/2007 0.86 1.20 1.00 9/25/2007 0.89 1.18 1.05 9/26/2007 0.89 1.17 1.08 9/27/2007 0.95 1.13 1.09 9/28/2007 0.93 1.17 1.06 9/29/2007 0.93 1.19 0.98 9/30/2007 0.93 1.15 1.05 10/1/2007 0.92 1.12 1.08 10/2/2007 0.93 1.14 1.14 10/3/2007 0.93 1.11 1.15 10/4/2007 0.94 1.09 1.07 10/5/2007 0.93 1.08 1.05 10/6/2007 0.92 1.08 0.97 10/7/2007 0.93 1.07 1.02 10/8/2007 0.92 1.07 1.02 10/9/2007 0.93 1.08 1.03 10/10/2007 0.92 1.10 1.05 10/11/2007 0.91 1.11 1.06 10/12/2007 0.90 1.13 1.04 10/13/2007 0.90 1.15 1.05 10/14/2007 0.90 1.15 1.03 10/15/2007 0.90 1.19 1.06 10/16/2007 0.90 1.21 1.07 10/17/2007 0.86 1.19 1.07 10/18/2007 0.92 1.33 1.06 10/19/2007 0.91 1.21 1.09 10/20/2007 0.89 1.57 1.09 10/21/2007 0.88 1.76 1.10 10/22/2007 0.91 1.77 1.10 10/23/2007 0.89 1.71 1.16 10/24/2007 0.89 1.58 1.10 10/25/2007 0.89 1.34 1.09 10/26/2007 0.87 1.32 1.08 10/27/2007 0.87 1.31 1.13 10/28/2007 0.90 1.38 1.17 10/29/2007 0.90 1.37 1.15 10/30/2007 0.89 1.34 1.17 10/31/2007 0.88 1.35 1.16 Exhibit 3-H 2007 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 11/1/2007 0.88 1.28 1.11 11/2/2007 0.90 1.41 1.15 11/3/2007 0.91 1.24 1.14 11/4/2007 0.92 1.30 1.15 11/5/2007 0.89 1.15 1.19 11/6/2007 0.89 1.15 1.13 11/7/2007 0.89 1.33 1.13 11/8/2007 0.89 1.32 1.10 11/9/2007 0.89 1.33 1.09 11/10/2007 0.87 1.29 1.12 11/11/2007 0.89 1.29 1.14 11/12/2007 0.89 1.32 1.13 11/13/2007 0.90 1.32 1.13 11/14/2007 0.89 1.29 1.11 11/15/2007 0.91 1.30 1.14 11/16/2007 0.91 1.30 1.15 11/17/2007 0.90 1.43 1.41 11/18/2007 0.91 1.32 1.27 11/19/2007 0.89 1.35 1.19 11/20/2007 0.91 1.28 1.15 11/21/2007 0.90 1.28 1.13 11/22/2007 0.88 1.33 1.16 11/23/2007 0.89 1.34 1.14 11/24/2007 0.87 1.38 1.12 11/25/2007 0.84 1.34 1.05 11/26/2007 0.88 1.36 1.08 11/27/2007 0.88 1.32 1.12 11/28/2007 0.89 1.31 1.05 11/29/2007 0.86 1.32 1.02 11/30/2007 0.85 1.36 1.04 12/1/2007 0.84 1.42 1.06 12/2/2007 0.84 1.56 1.19 12/3/2007 0.88 1.53 1.08 12/4/2007 0.85 1.53 1.10 12/5/2007 0.83 1.71 1.07 12/6/2007 0.86 1.43 1.00 12/7/2007 0.85 1.41 0.98 12/8/2007 0.82 1.42 0.95 12/9/2007 0.81 1.40 0.93 12/10/2007 0.80 1.39 0.93 12/11/2007 0.81 1.41 0.93 12/12/2007 0.81 1.37 0.97 12/13/2007 0.79 1.35 0.99 12/14/2007 0.81 1.35 0.99 12/15/2007 0.85 1.39 1.03 12/16/2007 0.84 1.36 1.01 12/17/2007 0.81 1.40 1.02 12/18/2007 0.80 1.39 1.01 12/19/2007 0.83 1.42 1.00 12/20/2007 0.83 1.43 0.95 12/21/2007 0.83 1.41 0.98 Exhibit 3-H Date 12/22/2007 12/23/2007 12/24/2007 12/25/2007 12/26/2007 12/27/2007 12/28/2007 12/29/2007 12/30/2007 12/31/2007 Mean Standard Deviation Oil 0.85 0.85 0.84 0.86 0.85 0.85 0.87 0.86 0.82 0.85 0.874 0.122 2007 Facility Allocation Factors Milne Point Unit Water 1.43 1.40 1.42 1.37 1.36 1.34 1.37 1.36 1.35 1.35 1.370 0.264 Gas 1.06 1.07 1.08 1.04 1.02 1.02 1.05 1.03 0.99 0.99 1.171 1.209 Exhibit 3-1 MPB-03 2007 Well Testing 2007 i 115 Average MPB MPB-04A Tests / 1 309 Month Field total all 6.3 KUP all 7.2 SBF all 4.8 SAG all 5.7 Reservoir Pad KUP KUP B 17.8 KUP C 10.7 KUP E 7.0 KUP F 3.7 KUP H 8.8 KUP J 3.9 KUP K 11.1 KUP L 7.4 SBF C 10.1 SBF E 6.8 SBF G 1.8 SBF H 8.4 SBF 1 1.6 SBF J 4.5 SBF S 5.0 SAG F 5.7 * Average Tests / Month calculated as total number of tests divided by (days operating divided by 30.4 days per month). Pad Well Formation Required Days On Total Tests 1 Tests Prod. MPB MPB-03 KUP _ 1 i 115 54 MPB MPB-04A KUP 1 309 233 MPB MPB-06 KUP 1...-- l 0 0 MPB MPB-09 KUP 1.. - 117 - 67 MPB MPB-10 KUP _- 1 0 0 MPB MPB-15 KUP 1 ._ 225 113 MPB MPB-16 KUP 1 185 137 MPB MPB-20 KUP _ _ 1 0 _ 0 MPB MPB-21 KUP 1 - _ 183 . 91 MPB MPB-22 KUP 1� 191 79 MPC MPC -01 KUP 1 _ 315 111 MPC MPC -03 KUP 1 _ 252 _ 69 MPC MPC -04 KUP 1 _ 224 _ 60 MPC MPC -05A KUP _ 1 __200 _ 60 MPC MPC -07 KUP 1 265 77 MPC MPC -09 KUP _ 1 234 _ 72 MPC MPC -13 KUP 1 323 _ 105 MPC MPC -14 KUP 1 278 85 Milne Point Unit Exhibit 3-1 2007 Well Testing Milne Point Unit Pad Well Formation Required Tests MPC MPC -21 KUP MPC MPC -22A KUP MPC MPC -24 MPC _; _ I_MPC-26 _KUP KUP MPC j MPC-40 KUP MPC M_ PC -41 _ SBF MPC MPC -43 KUP MPE MPE-04 KUP MPE _'MPE-06 KUP MPE MPE-08 KUP MPE MPE-09 KUP MPE MPE-10 KUP MPE MPE-11� KUP MPE _MPE-14 KUP MPE _ MPE-15 SBF MPE '� MPE-18 KUP MPE MPE-19 KUP MPE MPE-20A SBF MPE MPE-22 KUP MPE MPE-24A SBF MPE MPE-28 SBF MPE MPE-30A SBF MPE MPE-31 SBF MPE MPE-32 SBF MPF MPF -01 KUP MPF_ MPF -05 MPF _KUP F -MPF -06 MPF _KUP MPF -09 _ KUP MPF I MPF -13 KUP MPF �MPF-14 .-.KUP MPF MPF -18 KUP MPF MPF -22 KUP MPF MPF -25 KUP MPF MPF -29 KUP MPF MPF -33A SAG MPF MPF -34 KUP MPF _ MPF -37 KUP MPF .MPF -38 KUP MPF I_ MPF -45 KUP MPF J__ -MPF -50 KUP MPF _� _MPF -53 KUP MPF ^ MPF -54 KUP MPF MPF -57A KUP MPF MPF -61 KUP MPF JMPF-65 KUP MPF I MPF -66A KUP MPFMPF-69 KUP MPF _ MPF -78 KUP MPF MPF -79 KUP Days On Prod. i 1 1 260 1 j 247 1 j 281 1 -__-327 1 290 2 271 1 321 1 349 1 1_331 1 240 1 - 349 1 252 1 1 187 1 0 2 250 1 171 1 333 2 348 1 243 2 350 2 139 2 75 2 350 2 335 1 354 1 355 1 354 1 355 1 290 1 355 1 351 1 356 1 292 1 355 2 229 1 300 1 355 1 356 1 356 1 356 1 353 1 356 1 202 1 355 1 356 1 309 1 354 1 356 1 354 Total Tests 81 74 87 196 166 90 97 72 82 61 82 56 42 0 51 37 71 84 61 73 31 22 72 78 54 45 45 44 41 44 44 45 35 43 45 46 50 44 39 39 38 30 37 37 31 42 39 38 Exhibit 3-1 2007 Well Testing Milne Point Unit Pad Well Formation Required Days On Total Tests Tests Prnd_ MPFMPF-80 354 1 KUP MPF 304 _MPF -81 KUP MPF _ _MPF-86 _KUP 331 MPF 288 MPF -87A __KUP 291 MPF MPF -93 KUP MPF -.MPF -94 KUP MPG _MPG -02 SBF MPG 29 i -MPG -14 SBF MPG 262 MPG -15 SBF MPG 0 i MPG -16 SBF MPG 62 MPG -18 31 MPH _L_MPH-04 _SBF _SBF 333 MPH 350 MPH -OS _KUP 329 MPH 36 MPH -07A SBF MPH MPH -08B SBF MPH MPH -09 SBF MPH MPH -10 SBF MPH MPH -13A SBF MPH MPH -14 SBF MPH MPH -16 SBF MPH MPH -18 SBF MPH MPH -19 SBF MPI MPI -03 SBF MPI MPI -04A SBF MPI MPI -06 SBF MPI MPI -14 SBF MPI MPI -15 SBF MPI MPI -17 SBF MPI MPI -19 SBF MPJ MPJ -01A SBF MPJ MPJ -03 SBF MPJ MPJ -04 SBF MPJ MPJ -05 SBF MPJ MPJ-06 KUP MPJ _ MPJ -08A SBF MPJ _ MPJ -10 KUP MPJ MPJ -19A SBF MPJ MPJ -23 SBF MPJ MPJ -24 SBF MPJ MPJ -25 SBF MPJ MPJ -26 SBF MPK MPK-02 KUP MPK MPK-05 KUP MPK MPK-06 KUP MPK MPK-09 KUP MPK MPK-13 KUP MPK MPK-17 KUP MPKMPK-30 �MPK-33-KUP KUP MPIS 1 354 1 301 1 304 1 353 1 352 1 331 2 288 2 291 - _ 2224 2 - 317 2 221 2338 1201 2 _ _ 78 2 29 2 0 2 262 2 322 2 0 2 279 2 62 2 31 2 350 2 333 2 350 2 329 2 36 2 351 2 251 2 349 2 353 2 287 2 353 1 349 2 256 1 306 2 352 2 129 2 166 2 333 1 210 1 217 1 29 1 201 1 83 1 94 1 j 104 1 120 39_ 38 _ 35 43 41 _ 35 16 17 15 20 10 - 67 58 15 0-- 0 _0 73 97 0 107 28 1 _ 18 17 — 18 16 4.- 18_ 13 _ 51 54 48 53 45 38 38 _ 42 _ 2 30 _ 21 _ 43 98 93 5 87 11 20 54_ 36 Exhibit 3-1 2007 Well Testing Milne Point Unit Pad Well Formation Required Days On Total Tests Tests Prod. MPK MPK-37 KUP 1 _ 06 23 MPK MPK-38 KUP 1 156 56 MPL MPL-01A KUP 1 _ 9 _ 2 MPL _ _ ___MPL-02 KUP 1 313 67 MPL MPL-03 KUP _ _ 1 236 60 MPL _MPL-04 KUP _ 1 _ 350 _ 90 MPL _ MPL-05 KUP _ 1 _ 354 _ 83 MPL MPL-06 KUP _ 1 152 _ 22 MPL MPL-07 KUP 1 236 54 MPL MPL-11 KUP _ 1 345 84 MPL MPL-12 KUP 1 _ 351 86_ MPL MPL-13 -MPL-14 KUP _ 1_ 328 _ 95 _ MPL KUP 1 354 90 MPL MPL-20 KUP 1 _ 330 _ 83 MPL MPL-25 KUP 1 _ 355 86 MPL _MPL-28 KUP _ 1 237 _ 43 MPL MPL-29 KUP 1 354 101 MPL_ _ MPL-36 [ KUP 1 355 92 MPL MPL-40 KUP 1 0 _ 0 MPL MPL-43 KUP 1 318 66 MPS MPS -01A SBF 2 116 _ 4_ MPS MPS -03 SBF _ 2 149 24 MPS MPS -04 SBF _ 2 177 _ 36 MPS MPS -05 SBF 2 54 _ 3 MPS MPS -08 SBF _ 2 260 _ 71 MPS _-MPS-12 SBF _ 2 32 MPS MPS -17 SBF 2 _220 225 40 MPS MPS -19A SBF _ 2 253 60 MPS MPS -23 SBF _ 2 219 _ 10 MPS MPS -24 SBF _ 2 235 39 MPS MPS -25 SBF 2 254 29 MPS MPS -27 SBF 2 _ 228 _ 23 MPS MPS -28 SBF 2 221 35- Section 4 Sag River Oil Pool List of Exhibits Waterflood Pattern Map 4-A Total Reservoir Production Plot 4-B Total Reservoir Injection Plot 4-C Pertinent Data Summary 4-1) Reservoir Voidage Balance 4-E Static Pressure Data 4-F Injection Rate & Pressure Data By Well 4-G Sag River Oil Pool Waterflood Project Summary The Sag River waterflood area is shown in Exhibit 4-A. The locations of production and injection well pairings are shown to give a general visualization of waterflood polygons, but do not show estimated waterflood sweep. A Participating Area for the Sag was approved in 2005. The PA was extended based on plans to develop the reservoir further in the next five years. The locations of the active production and injection wells are shown with the waterflood pattern specifically identified. During 2007, there was only one Sag production well (MPF -33A) and one injection well (MPF -73A) that contributed to production/injection. Exhibit 4-B shows a production plot for the Sag River reservoir covering the entire history through December 2007. There was no production from the reservoir in most of 1999 and the entire year of 2000 because it was not economical to repair the failed ESPs. At the end of 2000, one well (MPC -23) was converted to a jet pump completion. In 2001, one well (MPF -33A) was side-tracked and completed with a jet pump completion and another well (MPF -73A) was deepened from an idle Kuparuk well into the Sag River reservoir as an injector. One producing well (MPC -23) was shut in for integrity reasons in 2002 and the injection well (MPF -73A) was changed to water service only in 2006 due to tubing to inner annulus communication on gas injection. The Sag River Oil Pool oil production averaged 189 STBD, gas production averaged 152 MSCFD, and water production averaged 36 STBD in 2007. Cumulative production through the end of 2007 is 1.83 MMSTB of oil, 1.90 BSCF of gas, and 1.69 MMSTB of water. The average water cut was 15.9% and the average GOR was 807 SCF/STB in 2007. Exhibit 4-C shows an injection plot for the Sag River reservoir through December 2007. The only injector (MPF -73A) started water injection in July 2002. The water injection rate for 2007 averaged 473 BWD, with no gas injected. Cumulative water injection since waterflood startup through the end of 2007 is 1.33 MMSTB and cumulative gas injection for the same period is 0.32 BSCF. In 2007, MPF -33A was on line for 11 months and MPF -73A was on line for 7 months. Exhibit 4-D presents a summary of the pertinent production information for the Sag River Oil Pool. Exhibit 4-E shows a monthly breakdown of production and injection data for the report period. Cumulative reservoir voidage was 5.1 MMRB at the end of 2007. The cumulative under - injection volume in the Sag reservoir is 3.4 MMRB. Exhibit 4-F presents the reservoir pressure data for the Sag River wells taken during 2007. The average of the pressures obtained in 2007 was 2772 psi (note that this is not a volumetric average reservoir pressure). This change is an increase from the average of pressures obtained in 2006 of 2364 psi. Exhibit 4-G provides a monthly summary of the injection rate and injection pressure data for the Sag River Oil Pool injector. Exhibit 3-H (Schrader Bluff Oil Pool) provides daily oil, gas, and water allocation factors for the Milne Point facility for 2007. Plans in 2008 are to evaluate repairing MPC -23 to enable it to return to production, to monitor connectivity between the injector MPF-73Ai to MPF -33A, and to continue to evaluate development options. Exhibit 4-A 1 03 Exhibit 4-B BP ALASKA - Milne Point Unit SAG Reservoir, Total Production 100.0 .r r r r. 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Oil Prod Cum SAG —Oil Prod Rate SAG —Water Prod Cum SAI -- Water Prod Rate SAG —Gas Prod Rate SAG Gas Prod Cum SAG 10000 0 10 60.0 O a` 50.0 a 40.0 5 O a 30.0 a 3 20.0 10.0 0.0 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Water Cut % SAG_ 0 Producers Online —X Gas/Oil Ratio SAG 4.5 4.0 3.5 3.0 O 2.5 2.0 0a 1.5 1.0 0.5 0.0 ii� ►i� i i► 1 100.0 .r r r r. 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Oil Prod Cum SAG —Oil Prod Rate SAG —Water Prod Cum SAI -- Water Prod Rate SAG —Gas Prod Rate SAG Gas Prod Cum SAG 10000 0 10 60.0 O a` 50.0 a 40.0 5 O a 30.0 a 3 20.0 10.0 0.0 95 96 97 98 99 00 01 02 03 04 05 06 07 08 —Water Cut % SAG_ 0 Producers Online —X Gas/Oil Ratio SAG 4.5 4.0 3.5 3.0 O 2.5 2.0 0a 1.5 1.0 0.5 0.0 Exhibit 4-C BP ALASKA - Milne Point Unit SAG Reservoir, Injection 10000 10000 a 0 LL U Illy C O U 100 2 m 100 A (7 02 03 04 05 06 07 08 - --'Water Inj Cum SAG_ — Water Inj Rate SAG_ —Gas Inj Cum SAG_ --F Gas Inj Rate SAG_ 0�- 02 03 N 05 0e Ol 09 0 Water Injector Online 6 Gas Injector Online Exhibit 4-D Milne Point Unit - Sag River Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2007 WATERFLOOD START-UP DATE: July 1, 2002 PRODUCTION Prior to Waterflood Start -Up: Oil (MSTB) 1,299 Gas (MMSCF) 1,302 Water (MSTB) 1,481 Since Waterflood Start -Up: Oil (MSTB) 532 Gas (MMSCF) 594 Water (MSTB) 213 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 1,325 Injection Gas (MMSCF) 324 AVERAGE OF PRESSURES OBTAINED IN 2007 @ 8.700' TVD as December, 2007 Pressure (psig) 2,772 WELL COUNT (Wells in Operation)* Production Wells 1 WAG Injection 0 Water Only Injection 1 Gas Only Injection 0 Notes: Reflects ONLY operating wells. Exhibit 4-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Sag River Oil Pool January - December 2007 Production; Injection: Oil Water Gas Reservoir Water Gas Voidage Voidage Voidage Month Prod Rate Prod Rate Prod Rate Voidage Inj Rate Inj Rate Replacement Replacement Balance (stb/day) (stb/day) (mscf/day) (rbbVday) (stb/day) (mscf/day) (rbbVday) Ratio (rbbVday) 1/31/2007 315 0 322 569 0 0 0 0.00 -569 2/28/2007 68 0 68 122 0 0 0 0.00 -122 3/31/2007 0 0 0 0 0 0 0 -- 0 4/30/2007 370 0 275 569 0 0 0 0.00 -569 5/31/2007 378 0 316 615 0 0 0 0.00 -615 6/30/2007 52 0 78 117 245 0 250 2.13 132 7/31/2007 167 0 180 311 947 0 966 3.11 655 8/31/2007 171 0 133 269 510 0 520 1.93 251 9/30/2007 22 0 14 32 931 0 950 30.02 918 10/31/2007 239 216 162 573 915 0 933 1.63 360 11/30/2007 253 128 156 489 1081 0 1,103 2.26 614 12/31/2007 229 82 124 403 1044 0 1,065 2.64 662 Average: 2007 189 36 152 339 473 0 482 1.42 143 Cumulative: mstb mstb mmscf mrb mstb mmscf mrb mrb 31 -Dec -07 1,831 1,694 1,896 5,060 1,325 324 1,664 0.33 -3,396 Blue text indicates metered rates. Red text indicates calculated numbers. Exhibit 4-F Static Pressure Data Sag River Oil Pool STATE OF ALASKA PBU Pressure Build Up ALASKA OIL AND GAS CONSERVATION COMMISSION Pressure Fall Off PP Pump Pressure RESERVOIR PRESSURE REPORT SBHP Shut -In Bottom Hole Pressure 1. Operator: BPXA 12. Address: 900 E. Benson Blvd Anchorage, Alaska 99508-4264 3. Unit or Lease Name: Milne Point 14. Field and Pool: Sag River ON Pool 5. Datum Reference: 8750' SS 6. Oil Gravity: API - 34 7. Gas Gravity: Air= .65 8. Well Name and Number. 9. API Number 50-X70(-70000(-)0(-)0( 10.011(0) or 11. AOGCC Gas (G) Pool Code 12. Final Test Date 13. Shut -In 14. Press. 15. B.H. Temp. Time, Hours Sum. Type (see instructions for codes) 16. Depth Tool 17. Final TVDss Observed Pressure at Tool Depth 18. Datum TVDss (input) 19. Pressure 20. Pressure at Gradient, Datum (cal) pspit. MPF -33A 50-50D-29226-89-01 PROD 525150 2/15/2007 263 SBHP 224 8,457 1,518 8,750 0.179 1,570 MPF -33A 50-500-29226-89-01 PROD 525150 10/4/2007 476 SBHP 222 8,457 1,812 8,750 0.214 1,875 MPF -73A 50.500.29227-44-01 INJ 525150 6/22/2007 51 SBHP 156 16,584 3,665 8,750 0.557 4,871 Avera a 2772 21. All tests reported herein were made in accordance with the applicable rules, regulations and instructions of the Alaska 011 and Gas Conservation Commission. I hembv certifv that the foregoing Is trine and correct to the best of m knowledge.I Signature V-l��`�+-C. TM. (� t l ✓l.2_ r v t �.QJV (G� Printed Name l� . �I G• ' e Date FL Fluid Level PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP Shut -In Bottom Hole Pressure Exhibit 4-G Injection Rate and Pressure Data Milne Point Field Sag River Pool Wellhead Days Inj Vol Alloc Injection Rate Sw Name Month Pres Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -73A 1/1/2007 0 H2O 0 MPF -73A 2/1/2007 0 H2O 0 MPF -73A 3/1/2007 0 H2O 0 MPF -73A 4/1/2007 0 H2O 0 MPF -73A 5/1/2007 0 H2O 0 MPF -73A 6/1/2007 1,488 8 H2O 7,342 918 MPF -73A 7/1/2007 2,386 31 H2O 29,359 947 MPF -73A 8/1/2007 2,486 19 H2O 15,803 832 MPF -73A 9/1/2007 2,622 30 H2O 27,929 931 MPF -73A 10/1/2007 2,829 31 H2O 28,369 915 MPF -73A 11/1/2007 2,713 30 H2O 32,443 1081 MPF -73A 12/1/2007 2,675 31 H2O 32,375 1044 Section 5 Production/Injection Well Surveillance List of Exhibits Milne Point Surveillance 1/1/2007 —12/31/2007 5-A Production/Injection Well Surveillance As per Conservation Order 205 (Kuparuk River Oil Pool) and Order 477 (Schrader Bluff Oil Pool), the Milne Point Operator runs injection surveys on at least one third of the existing multiple sand injectors annually and on new multiple sand injectors. There were 24 existing Kuparuk multi -sand injectors in 2007. We obtained 10 injection surveys total in 2007. One injector was logged twice at different times in the year. We also obtained one single zone injector survey. So, surveys were obtained on 8 of the 24 multi -sand injectors. There were 27 existing Schrader Bluff multi -sand injectors in 2007. We ran 14 injection surveys in 2007; two of which were repeats on the same injector at different points during the year and one of which was on a selective single injector to confirm injection was only entering one zone per design. Therefore, in the Schrader, we obtained surveys on 12 of the 27 injectors. No injection survey was needed in the Sag River Oil Pool because it is a single zone reservoir. Normally, a Spinner/Temperature/Pressure (STP) survey is run since such a survey provides reliable information for most of our wells. This can be done with memory gauges on slickline or with E -line. Where these logs are performed on injectors, they are called an IPROF. Water Flow Logs (WFL) are run on wells with low water velocities where an STP survey would not be accurate. Since the majority of producers at Milne Point are completed with ESPs or jet pumps which preclude logging below the pump while on production, few production logs are run. In 2007, two production logs were obtained in Kuparuk gas lift producers. One production log was run on a jet -pump Schrader Bluff producer while nitrogen -lifting the well. In place of regular production logs, the Schrader Bluff field has utilized geochemical fingerprinting to determine production splits from the N, OA, and OB sands. The process is only applicable to certain wells based on the oil samples that have been obtained from the different zones in different hydraulic units. In 2007 the geochemical fingerprinting program at the Schrader Bluff was temporarily suspended while some internal analysis was being performed on the general quality of data that was being returned from the process. In 2008 it is anticipated that the program will resume, but with a more limited well -set. Geochemical analysis is not able to provide zonal production data for wells in the Kuparuk reservoir. Exhibit 5-A is a summary of the Milne Point field well surveillance performed in 2007 on both producers and injectors. 2008 surveillance plans are similar to 2007. In addition to obtaining injection surveys on 1/3 of multi -sand injectors, we will likely obtain one or two single zone Kupanilc injection surveys to determine the distribution of flow between the lobes within the A sands. We will also continue to use geochemical fingerprinting to determine production splits in the Schrader Bluff; however, the frequency of data collection may decrease, as well as the specific subset of wells where it is obtained due to the data quality. The further use of PPROFs on Schrader Bluff wells will also be explored. Exhibit S-A Milne Point Unit 2007 Surveillance Kuparuk River Oil Pool Schrader Bluff Oil Pool Sw Name Project Well Type Rec Date Log Type Comments MPS -21 Ku amk Prod 01/15/07 STP Splits: 100%B 0%C. MPC -05A Ku awk Prod 01/25/07 STP Slits: 28%B 72%C. MPG -08 Ku awk In' 08/11/07 WFL Slits: 100%A 0%B 0%C. MPO -10 Ku amk IN 08/13/07 IPROF Slits: 83%A2/A3 0%B 17%C. MPC -28A Ku aruk In 01/20/07 IPROF Slits: 0%A2 0°h A3 100%C. MPC -28A Ku aruk In 06/16/07 (PROF Slits: 93%A3 2%C. MPE-12 Schrader In' 01/21/07 (PROF Slits: 250/.NC 45% NO, 300/ OA. MPF -10 Kupawk IN 09/15/07 (PROF Slits: 74%A7 26%A2. MPF -62 Ku aruk In' 05/31/07 IPROF Slits: 93%A 7%B. MPF -95 I Ku amk In' I 05/29/07 (PROF Splits: 62%A1 18%A2.13% A3, 7%C. MPG -01 Schrader In' 05/26/07 !PROF Data quality poor. Nos lits determined. MPG -07 Schrader In' 10/20/07 (PROF Slits: 57%N 43% OA. MPG -07 Schrader Ini 11/30/07 IPROF S Ilts: 0%N 13% OA 87°,606. MPG -10 Schrader In' 05/16/07 (PROF Slits: 30% NB, 70% OA, 0% OB. MPG -13 Schrader In' 05/18/07 IPROF 5 Ihs: 15% OA, 85% OB data quality poor). MPG -19 Schrader In' 06/10/07 IPROF Splits: 100% NB(only NB open at time). MPH -17 Schrader In' 10/07/07 (PROF Splits: 100% OA(only OA open at time). MPH -17 Schrader In' 11/12/07 (PROF Slits: 28% NB, 2% NE, 70% OA. MPI -08 Schrader In' 07/05/07 (PROF Slits: 38%N 32% OA, 30% OB. MPI -09 Schrader IN 05/24/07 IPROF Splits: 20% NB, 10% NC. 11% ND, 59% OA, 0% OB. MPI -16 Schrader In 1 05/25/07 IPROF Slits: 45% NB, 55% OA, 0% OB. MPJ -15 Schrader In' 05/25/07 IPROF Slits: 0% NB. 100% OA, 0% OB. MPJ -15 Schrader In' 08/12/07 IPROF Slits: 0%NB 78% OA, 22% OB. MPJ -17 Schrader In' 05/25/07 (PROF Splits: 33% NB, 0% NC. 0-/6 OA, 67% 013. MPK-18A Ku amk IN 06/04/07 IPROF Slits: 1%B 99%C. MPL-09 I Ku awk I In' 09/17/07 IPROF Slits: 26%A1 34%A2/A3 12%B 28%C. MPL-33 Ku amk In' 11/13/07 IPROF S Ilts: 100%A 0%C. MPS -02 Schrader In' 10/01/07 IPROF S Ills: 23%NB. 22 -/.OA, 55% OB. MPS -05 Schrader Prod 10/10/07 STP Data quality poor. Definite flow from OA OB indeterminate. DED = Dedicated injection into single sand RFT = Repeated Formation Test FSPL = Full Suite Production Log RST = Reservior Saturation Tool GEO = Geochemical Analysis of Production split: SZT = Separate Zone Test IPROF/STP = Spinner, Temperature, Pressure WBL = Warmback log PDS = Pulsed Decay WFL = Water Flow Log Section 6 Shut in Well Status List of Exhibits Milne Point Shut in Well Status 1/1/2007 —12/31/2007 6-A Exhibit 8-A 2007 Shut -In Wells Milne Point Unit Sw Name Reservoir API Number Date Shut Reason for Current Mechanical Condition of Well, Future Utility Comments In Well Shat- including integrity issues' Plans a Ina Po sibilttim3 Ml WSW Prince Creek 500292049000 Sep -01 E ESP failed 1 Water source well not currently needed. Evaluate replacing ESP when need arises. MPB-06 KUpmuk 5002921276W MU -06 D Surface casing leak 1 High GOR well. SI for gas handling and Ann - Comm issues. MPB-07 Kuparuk 500292132400 Aug -02 D Pressure building up slowy. IBP set in well Feb 2 High GOR well. Needs permanent fkwAne 2006 to secure. installed and gas Iff[ line is blinded. Diagnostics determined potential source of pressure from packer leak. Remedial work to secure well armed. MP&08i Kuparm 500292132500 Oct -94 E No known problems 3 Further use as an injector not required. Evaluate potential sidetrack. MP&10 Kuparuk 500292128000 Nw-02 B No knomt problems 2 High water cul. Evaluating potential production. Blinded in the module and missing some of the surface kit. MPB-13 Kupantk 5W292134800 JM -89 B No known problems. 3 GL well that was shut in due to high water ult. Possible channel Into water zoite. Wellhouse and gowliram removed MPB-17i Kuparuk 500292143400 Apr -98 E No mechanical problems. 3 Wellhouse and flowdires removed. Oulck communication with producer. Evaluate potential sidetrack. MP&18i Kuparuk 500292145000 Jan -06 E No mechanical problems. 1 SI because there were no offset producers an lire. MPB-19 Kuparuk 500292145100 Jul -91 B 3 Wellhouse and flowfines removed. GL well. High water cut producer. Possible frac into water zona. Evaluate potential sidetrack. MPB-20 Kuparuk 500292152400 Feb -03 D Has T x IA communication and would require 2 Cycling water from 8-144. High GOR well, more diagnostics and repair, as well as surface facilities cannot handle gas. Would need work prior to returning to production diagnostics to determine needed repairs. Blinded in the module and missing some of the surface kit. Evaluate potential sidetrack. MP&23 Kuparuk 500292191500 Jun -01 A No known well integrity Issues. Would need a 2 High GOR well. Facilities normally cannot TTP pulled prior to being POP'd handle gas. Attempted to prod" in 2006 but 1frozentplugged. Working to thaw. MPC -114 KUParuk 5002921321 W Apr -95 E No known problems 3 Further use as an injector not required while no offset protlwere on line. MPC -171 Kuparuk 500292147300 May -00 O Leak In 9 5/8' casing to surface 1 No current plane to repair. Offset producer L-06 would likely have quick communication. MPC -20 Kuparuk 500292191400 Oct -92 B No mechanical problems 3 High water cut Peri d without good logs. Wellhouse and flowl4res removed. Would need WSO. MPC -23 Sag 500292284300 Apr -02 D Lost integrity of CT jet pump. 2 RWO planned to remove coil JP and replace with JP or ESP to restore production. MPC-25Ai Kuparuk 500292283801 Doo -03 E No known problems 1 Shut in well due to rapkVhigh gas breakthrough in C-07 and C-21. Possible Kuparuk or Schrede Bluff sidetrack candidate. MPCFP-02i Kupamk 500292125000 Nw-95 E No known mechanical problems 3 Thief zone directly to offset producers. Evaluate 5a hrader potential. MPD -01 Kuparuk 500292086400 Deo -00 C Dead ESP completion downhole. no support to 5 No support to block. No flowlines from D pad. block Plan to P&A In 2008. MPD -02A Kupank 500292090W1 Aug -99 B Well secured Jure -05 with downtole plug. 5 High water cut well. No flowlines from D pad. Plan to P&A in 2008. MPE-021 Kuparuk SW292141700 Aug -98 C No known problems. Well is secured w/ 3 No surface facilities. Evaluate conversion to downhole plug producer. MPE-14 Kuparm 500292273400 Jut -04 C No known problems. Failed ESP In well. 3 High WC producer. Well not connected to electrical infrastructure due to insufficient space Ion E d. PAPE -21 Schrader 500292289400 NW -98 E ESP sanded -up 3 Wellhouse and flowlines rammed MPE-33 Schrader 5002922898W Oct -99 C ESP failed; no surface casing and Ibex has no 3 Welktoum and flow ines rammed. Posse cement conversion to injection. MPF -17i Kuparuk 500292282300 Dec -05 D Tubing integrity problem 2 RWO needed to replace tubing. Requires new seismic to understand HU connectivity, MPF -41i KOpanrk 500292277000 Ocl-04 E No known problems 1 Drifted as a producer. High water saturation so converted to injection. No response seen in offset producer. Evaluate potential skletrack. MPF -821 K1paruk 500292297100 Jan -03 E No known mechanical problems 1 High pressure block. Evaluate potential sidetrack or conversion to producer. MPG -04 Schrader 500292194100 Jol-o5 E Failed ESP 1 9 518 surface mg. 7' prod. Liner. Possible ST conversion to i 'ector MPG -05 Schrader 500292213800 Jan -05 E Tubing Is OK but the liner collapsed. 1 Possible sidetrack MPG-0BA Schrader 500292214101 MU -04 C Repeated sang wants isolating well from 1 9 5B surface mg. 7' prod. Urer. OH gravel reservoir. pa&cont letion. Evaluating POP In 2008. MPG -11 Schrader 500292278100 JuWI C ESP failed 1 MPG -12 Schrader 500292279200 JuHYI C ESP failed 1 No surface mg. MPH -01 Schrader 500292206100 Oct -98 C ESP failed 1 Well house has been removed MPH -02 Ugnu 500292206200 Nm -01 A No known problems. Has a temp drive for ESP 1 Oil sample retrieved during 2006 but no roduction to jAanI MPH -03 Schrader 500292208300 -91 C No known Problems. ESP still functional. 1 MPH -001 Kuparuk 50029225MM JLA-02 E No krovm problems. High we offset producer (H 1 High we offset producer . Evaluate rehrming to 05) injection and monitoring producer. Evaluate polemist sidetrack. 'Note - Wells were shut in 10D% in 2007 Exhibit G -A 2007 Shut -In Wells Milne Point Unit Sw Name Reservoir API Number Date Shut Reason for Current Mechanical Condition of Well, Future Utility Comments In Well Shut- including integrity lmma2 Plans 8 n' P ibiliti ' MPH -09 Schrader 500292280900 May -W D Hole In casing at 311' 2 Major RWO required. Evaluating redevelopment options in HU. MPI -01 Schrader 500292208500 De 98 C ESP failed 1 WH and Bowlines rammed In'98 MPI -07 Schrader 500292260200 Jan -04 C ESP failed. 3 95x8 surface MO.7'liner MPI -11 Schrader 500292903300 4r-03 C No known problems. Skov stream of fluid 1 coming out of the 4' conductor colors In 104 periodically starts again. MPI -12 Schrader 500292303800 Jan -03 C Well cannot be operated with current ESP In 1 ace. MPJ -07 Schrader SW292219800 SWO3 C ESP failed 1 9 SIB surface MO. 7: rod liner. MPJ -09A Schrader 500292249501 Jan -04 C Repeated sanding wants Isolating well from 2 9 518 surface mg. 7: prod liner. 4.5 Boman /W reservoir. stated finer. Plans to go In and try to cleanout the liner to brij back online in 2008 MPJ -12 Kuparuk SW2922506W Jul -98 C ESP failed 1 Evaluate potential sidetrack to Schrader targets. MPJ -16i Kuparuk 500292261500 Jan -99 E No known problems 1 No surface facilities. Evaluate potential Schrader sidetrack. MPJ -21 Schrader 5002922825W Dea04 C ESP failed. 1 RDS well no surface MPL-101 Kuparuk 5002922076W Aug -05 E No known mechanical problems 1 SI for reservoir manegement. Evaluate return to injection. MPL-17 Kuparuk 500292253900 Apr -00 B ESP failed. Low remaking reserves 1 Low remaining reserves. Evaluate potential gas storage well or Kuparuk sidetrack. MPL-21 i Kuparuk 500292262900 Oct -98 E High pressure block 1 High pressure block. Evaluate comersion to producer or sidetrack. MPL-34 Kupamk 500292278800 Oct -0e E High pressure block No indication of communicating with surrouding injectors -: L -35a or KRU well K-24. Periodic pressure surveys indicate no drop in SBHPs. MPL-37A Schrader 500292286401 NW -99 C Dead ESP, no other mechanical issues; no 1 Surface kit partially robbed surface mang MPL-391 Kuparuk 500292278800 Jan -99 E No known mechanical problems 1 No surface facilities. Located in Isolated fault block, does not support offset producers. Evaluate possible sidetrack or recon letion. MPL-40 Kuparuk W0292285500 May -06 D Failed ESP 2 Very low reservoir pressure -1600 psi datum: very tilde communication with F-821. Three ESP failures in less than 1 year with severe erosion as the root cause and low flow rate as the other reason. Routine maintenance also required when well is on production MPL-45 Kuparuk 500292291300 Feb -01 C ESP failed. 1 Low productivity. Evaluate comeretan to jet pumpapotential Schrader sidetrack. MPS -15 Schrader 500292306100 Aug -05 E No known problems 1 Fault block is apparently isolated, very fine rtto offset roductim. MPS -21 Schrader 500292306.500 Oct -05 E No known problems, Cement over perforators 1 IM, Lost CT oder-reamer in tale MPS -22 Item 500292317600 Se C No known roblems 1 WaPo for offset Injector to be repaired High GOR, currently uncompeti ive to produce due to facility constraints, no known mechanical problems High water, currently unsconomlo to produce, no known mechanical problems Low production rate, no know mechanical problems Mechanical problems Other (Specify under comments) current mechanical condition including the condition of installed tubing and casing strings. lure Utility Evaluating remedial, sidetrack and/or reddll opportunities Remedial well work planned Long term Shut-in welVNo immediate plane Suspended well PBA planned Other (Specify under comments) Note - Wells were shut in 100% in 2007