HomeMy WebLinkAbout2010 Colville River UnitConocri'Phillips
March 31, 2010
Alaska Oil and Gas Conservations Commission
333 W ih Avenue, Suite 100
Anchorage AK 99501
Attention: Commissioner Dan Seamount
Gaute Naadland
Supervisor, WNS Base
ConocoPhillips Company
700 G Street, AT0-1770
Anchorage AK 99501-0360
Telephone 907-265-6822
RE: 2010 Reservoir Surveillance Report, Alpine Oil Pool and 2010 Reservoir
Review Reports: Nanuq, Fiord and Qannik Oil Pools.
Dear Commissioner Seamount,
ConocoPhillips Alaska Inc., as operator and on behalf of the working interest owners of
the Colville River Unit, submits the 2010 Surveillance Report for the Alpine Oil Pool and
the 2010 Reservoir Review Reports for the Nanuq, Fiord and Qannik Oil Pools in
accordance with their respective conservation orders (CO), As follows:
• Alpine Oil Pool, CO 4438, Rule 8 (incorporates Nanuq-Kuparuk Oil Pool)
• Nanuq Oil Pool, CO 562, Rule 10
• Fiord Oil Pool, CO 569, Rule 9
• Qannik Oil Pool, CO 605, Rule 9
Inquiries regarding this report may be directed toward Jack Walker (265-6268) at this
office.
Sincerely,
Gaute Naadland
Supervisor WNS Base
North Slope Operations and Development
Enclosures
2010 Annual Reservoir Surveillance and Reservoir
Review Reports
Colville River Unit: Alpine, Nanuq, Fiord and Qannik
Oil Pools
MARCH 31, 2011
ii
Table of Contents:
Alpine Oil Pool Annual Reservoir Surveillance........................................................................1
A: Progress of Recovery Projects Alpine Status Update...........................................................1
B: Voidage Balance...................................................................................................................2
C: Results and Analyses of Production Log Surveys, Tracer Surveys and Observation Well
Surveys. ....................................................................................................................................2
D: Future Development Plans. ..................................................................................................2
Nanuq Oil Pool Annual Reservoir Review................................................................................3
A: Nanuq Oil Pool reservoir pressure Maps at datum...............................................................3
B: Summary and Analysis of reservoir pressure surveys..........................................................3
C: Estimates of Reservoir pressure...........................................................................................3
D: Results and analysis of production, temperature tracer surveys, observation well surveys
and special monitoring. .............................................................................................................3
E: Estimates of Yearly Production and Reservoir Voidage Balance .........................................3
F: Progress of plans and tests to expand the productive limits of the pool...............................4
G: Results of Surface Safety Valve Testing ..............................................................................4
Fiord Oil Pool Annual Reservoir Review. .................................................................................5
A: Fiord Oil Pool reservoir pressure map at datum ...................................................................5
B: Summary and Analysis of reservoir pressure surveys..........................................................5
C: Estimates of Reservoir pressure...........................................................................................5
D: Results and analysis of production, temperature tracer surveys, observation well surveys
and special monitoring: .............................................................................................................5
E: Estimates of 2010 Yearly Production and Reservoir Voidage Balance ................................5
F: Progress of plans and tests to expand the productive limits of the pool...............................6
G: Results of Surface Safety Valve Testing ..............................................................................7
Qannik Oil Pool Annual Reservoir Review...............................................................................8
1: Reservoir Voidage Balance and Cumulative Status by Interval............................................8
2: Summary and Analysis of reservoir pressure surveys ..........................................................8
3: Results and analysis of production and injection log surveys, temperature, tracer surveys,
observation well surveys and special monitoring. .....................................................................9
4: Review of Qannik Pool Production Allocation Factors and Issues........................................9
5: Progress of Enhanced Recovery Projects.............................................................................9
6. Reservoir management summary including results of any reservoir simulation studies.......9
Attachment 1 Colville River Unit .............................................................................................10
Attachment 2 Reservoir Pressure Maps at Datum.................................................................11
Attachment 3 10-412 Pressure Survey Results by Pool........................................................15
Attachment 4 Surface Safety Valve Testing 2010....................................................................1
2010 CRU Reservoir Surveillance Report 1
Alpine Oil Pool Annual Reservoir Surveillance
ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the
Colville River Unit (CRU), submits this Alpine Annual Reservoir Surveillance Report as required
for the Alpine Oil Pool Conservation Order 443B, Rule 8. Effective March 26, 2009, the Alaska
Oil and Gas Conservation Commission (AOGCC) amended the Alpine pool rules to include the
Kuparuk zone in the Alpine Oil Pool within the Alpine geologic zone. These AOGCC orders
address pressure communication between the Alpine and Kuparuk zones. The AOGCC also
terminated the Nanuq-Kuparuk Oil Pool and expanded the area of the Alpine Oil Pool to cover
the extents. For this report the Alpine and Nanuq-Kuparuk pools are combined and are
discussed as the Alpine Oil Pool.
Attachment 1 illustrates the current Colville River Unit Boundary and the surface facility pad
locations.
A: Progress of Recovery Projects Alpine Status Update
Following is a summary of the status at Alpine as of January 1, 2011:
• 63 producers
• 56 injectors
• 2 disposal wells
Average Metrics for 2010
-Average oil production rate.............................................................61.1 MBOPD
-Average gas production rate...........................................................75.2 MMSCFD
-Average water production rate........................................................39.5 MBWPD
-Average gas injection rate ..............................................................58.6 MMSCFD
-Average water injection rate ...........................................................120.9 MBWPD
Cumulative Volumes Produced and Injected Since Start-Up
-Cumulative oil production through December 2010:.......................349.6 MMSTBO
-Cumulative gas production through December 2010:.....................421.7 BSCF
-Cumulative water production through December 2010:..................40.7 MMSTBW
-Cumulative gas injection through December 2010: ........................369.9 BSCF
-Cumulative water injection through December 2010: .....................393 MMSTB
2010 CRU Reservoir Surveillance Report 2
B: Voidage Balance
Alpine Combined Pool 2010 Voidage Balance by Month
Month Injection/Withdrawl Cumulative
Ratio RVB/RVB
Injection / Withdrawl
Rate RVB/RVB
1/31/2010 0.99 1.22
2/28/2010 1.00 1.24
3/31/2010 1.00 1.20
4/30/2010 1.00 1.12
5/31/2010 1.00 1.12
6/30/2010 1.00 1.03
7/31/2010 1.00 1.08
8/31/2010 1.00 1.03
9/30/2010 1.00 1.09
10/31/2010 1.01 1.10
11/30/2010 1.01 1.09
12/31/2010 1.01 1.14
1/31/2011 1.01 1.18
C: Results and Analyses of Production Log Surveys, Tracer Surveys and Observation
Well Surveys.
A pressure survey map is presented in Attachment 2, the 10-412 report of reservoir pressure is
Attachment 3.
Several pressure surveys were conducted on Alpine wells during the course of operations in
2010. The reservoir is continuously being managed to allow for local pressure build up in areas
of historic under-injection, while maintaining average pattern pressures at or above the level
required for stable production and optimum EOR performance in the rest of the field. Reservoir
pressures are estimated from the Alpine full field simulation model as well as from inflow
performance analyses. Both approaches are calibrated with actual reservoir pressure
measurements collected from static surveys taken in development wells.
D: Future Development Plans.
Reservoir management of the Alpine field in 2011 will attempt to maximize oil rate while
continuing to gather strategic data associated with peripheral development opportunities.
Activities supporting this effort will include: (1) targeting a pattern level injection/withdrawal ratio
of one; (2) managing MWAG injection to maximize recovery and optimize lift within ACF gas
handling limits; (3) updating and ranking workover and peripheral development opportunities for
optimum drilling rig utilization and (4) identifying well stimulation candidates and hydraulically
fracture stimulating up to four Alpine producers. These activities are expected to partially offset
existing field decline
2010 CRU Reservoir Surveillance Report 3
Nanuq Oil Pool Annual Reservoir Review.
ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the
Colville River Unit (CRU), submits this Nanuq Oil Pool Annual Reservoir Review as required for
the Nanuq Oil Pool Conservation Order 562 Rule #10.
A: Nanuq Oil Pool reservoir pressure Maps at datum
Please see attachment 2 for the 2010 Reservoir Pressure map at datum
B: Summary and Analysis of reservoir pressure surveys
Please see attachment 3 for the 10-412 report of reservoir pressures.
C: Estimates of Reservoir pressure
Reservoir pressure is estimated to be approximately 2600 psi at a datum of 6150 ft subsea.
D: Results and analysis of production, temperature tracer surveys, observation well
surveys and special monitoring.
Positive rate response to water injection noted in all Nanuq-Nanuq producers during 2010
confirming connected pore volume over interwell distances.
E: Estimates of Yearly Production and Reservoir Voidage Balance
• 2 Nanuq Injectors
• 1 Nanuq Observation Well
• 3 Nanuq Producers
Average Metrics for 2010
-Average oil production rate.............................................................0.67 MBOPD
-Average gas production rate...........................................................1.0 MMSCFD
-Average water production rate........................................................0.1 MBWPD
-Average water injection rate ...........................................................3.0 MBWPD
-Average miscible gas injection rate ................................................0 MMSCFD
Cumulative Volumes Produced and Injected Since Start-Up
-Cumulative oil production through December 2010:.......................0.7 MMSTBO
-Cumulative gas production through December 2010:.....................1.4 BSCF
-Cumulative water production through December 2010:..................0.2 MMSTBW
-Cumulative miscible gas injection through December 2010: ..........0.0 BSCF
-Cumulative water injection through December 2010: .....................1.5 MMSTB
2010 CRU Reservoir Surveillance Report 4
Nanuq Pool 2010 Voidage balance by Month
Month
Injection / Withdrawal
Cumulative Ratio RVB/RVB
Injection / Withdrawal
Rate RVB/RVB
1/31/2010 0.451 3.655
2/28/2010 0.535 3.127
3/31/2010 0.609 2.856
4/30/2010 0.655 2.272
5/31/2010 0.721 3.318
6/30/2010 0.781 3.514
7/31/2010 0.769 0.447
8/31/2010 0.751 0.044
9/30/2010 0.77 1.684
10/31/2010 0.823 4.196
11/30/2010 0.89 3.83
12/31/2010 0.946 3.169
F: Progress of plans and tests to expand the productive limits of the pool
Current plans are to continue to develop the Nanuq reservoir using a phased approach. During
the fourth quarter of 2010, a producer, CD4-298, was drilled. Additional drilling activity is also
planned for the original development area with completion of the CD4-213 well still under
consideration.
G: Results of Surface Safety Valve Testing
All surface safety valves tests performed in 2010 are found in attachment 4.
2010 CRU Reservoir Surveillance Report 5
Fiord Oil Pool Annual Reservoir Review.
ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the
Colville River Unit (CRU), submits this Fiord Oil Pool Annual Reservoir Review as required for
the Fiord Oil Pool Conservation Order 569 Rule #9. The Fiord Oil Pool is made up of two areas
the Fiord-Nechelik and the Fiord-Kuparuk.
A: Fiord Oil Pool reservoir pressure map at datum
Please see attachment 2 for the 2010 Reservoir Pressure map at datum
B: Summary and Analysis of reservoir pressure surveys
Please see attachment 3 for the 10-412 report of reservoir pressures.
C: Estimates of Reservoir pressure
3270 psi, pore volume weighted.
D: Results and analysis of production, temperature tracer surveys, observation well
surveys and special monitoring:
Pressure and production responses in the Fiord Kuparuk interval suggested anisotropic
permeability.
Production responses in CD3-301A and suggested communication between the Fiord Nechelik
and Fiord Kuparuk intervals.
Production response in CD3-123 suggested anisotropic permeability in the Fiord Nechelik
interval.
E: Estimates of 2010 Yearly Production and Reservoir Voidage Balance
• 7 Fiord-Nechelik Injectors (2 injectors pre-produced in 2010)
• 8 Fiord-Nechelik Producers
• 3 Fiord-Kuparuk Injectors
• 3 Fiord-Kuparuk Producers
Average Metrics for 2010
-Average oil production rate.............................................................25.8 MBOPD
-Average gas production rate...........................................................23.3 MMSCFD
-Average water production rate........................................................6.4 MBWPD
-Average water injection rate ...........................................................26.0 MBWPD
-Average miscible gas injection rate ................................................23.9 MMSCFD
2010 CRU Reservoir Surveillance Report 6
Cumulative Volumes Produced and Injected Since Start-Up
-Cumulative oil production through December 2010:.......................31.7 MMSTBO
-Cumulative gas production through December 2010:.....................23.7 BSCF
-Cumulative water production through December 2010:..................3.8 MMSTBW
-Cumulative miscible gas injection through December 2010: ..........19.7 BSCF
-Cumulative water injection through December 2010: .....................34.9 MMSTB
Fiord Combined Pool 2010 Voidage balance by Month
Month
Injection / Withdrawal
Cumulative Ratio
RVB/RVB
Injection / Withdrawal
Rate RVB/RVB
1/31/2010 1.028 0.967
2/28/2010 1.022 0.814
3/31/2010 1.015 0.851
4/30/2010 1.005 0.784
5/31/2010 1.009 1.116
6/30/2010 1.011 1.055
7/31/2010 1.009 0.976
8/31/2010 1.002 0.818
9/30/2010 0.997 0.849
10/31/2010 0.999 1.038
11/30/2010 0.996 0.911
12/31/2010 0.997 1.024
F: Progress of plans and tests to expand the productive limits of the pool
Eleven Fiord Nechelik horizontal wells were completed in the Phase I development in the
Nechelik reservoir, which was completed in 2009. Five Fiord Nechelik horizontal wells were
drilled during the winter only drilling season in 2010. Five additional wells are planned for the
winter only drilling season in 2011.
Two Fiord Kuparuk wells were drilled in the 2010 winter drilling season. These were re-drills of
the previously drilled CD3-301 and CD3-302 wells. No Fiord Kuparuk drilling is planned for
2011.
All data collected to date in the Nechelik and Kuparuk reservoirs are being used to refine the
geocellular models for the two reservoirs in the Fiord CD3 development area. These new
models will be history matched and used for forecasting in 2011.
Development plans within both Fiord reservoirs continues to be an MWAG flood primarily via
line-drive horizontal well patterns and a few slant wells in the Fiord Kuparuk. Implementation of
EOR is integral and necessary for the Fiord CD3 project.
With Alaska Oil and Gas Conservation Commission (AOGCC) approval of the updated Area
Injection Orders in 2008, commingled injection of produced water and sea water began in the
Fiord PAs in early 2008. To minimize potential corrosion effects a minimum transportation
velocity is being maintained in the CD3 water injection line. This has resulted in excellent
voidage replacement in the Fiord reservoirs in 2008, with the current voidage replacement
significantly above 1.0. With the construction of new water handling facilities at the ACF, the
injection into the Fiord reservoirs will either be placed on produced water or sea water only;
since late 2009, seawater only has been used.
2010 CRU Reservoir Surveillance Report 7
G: Results of Surface Safety Valve Testing
All surface safety valves tests performed in 2010 are found in attachment 4.
2010 CRU Reservoir Surveillance Report 8
Qannik Oil Pool Annual Reservoir Review.
ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the
Colville River Unit (CRU), submits this Qannik Oil Pool Annual Reservoir Review as required for
the Qannik Oil Pool Conservation Order 605 Rule #9.
1: Reservoir Voidage Balance and Cumulative Status by Interval
• 6 Qannik Producers
• 3 Qannik Injectors
Average Metrics for 2010
-Average oil production rate.............................................................2.6 MBOPD
-Average gas production rate...........................................................1.8 MMSCFD
-Average water production rate........................................................0.0 MBWPD
-Average water injection rate ...........................................................3.4 MBWPD
Cumulative Volumes Produced and Injected Since Drilling
-Cumulative oil production through December 2010:.......................2.3 MMSTBO
-Cumulative gas production through December 2010:.....................2.0 BSCF
-Cumulative water production through December 2010:..................0.0 MMSTBW
-Cumulative water injection through December 2010: .....................3.4 MMSTB
Qannik Pool 2010 Voidage balance by Month
Month
Injection / Withdrawal
Cumulative Ratio RVB/RVB
Injection / Withdrawal
Rate RVB/RVB
1/31/2010 1.05 1.082
2/28/2010 1.034 0.738
3/31/2010 1.022 0.805
4/30/2010 1.015 0.879
5/31/2010 1.01 0.906
6/30/2010 1.01 1.014
7/31/2010 1.004 0.852
8/31/2010 0.988 0.587
9/30/2010 0.989 1.019
10/31/2010 0.989 0.973
11/30/2010 0.985 0.877
12/31/2010 0.992 1.2
2: Summary and Analysis of reservoir pressure surveys
Qannik did not receive any downhole static pressure surveillance in 2010. No Pressure Map is
provided.
No pressures are included in the 10-412 report.
2010 CRU Reservoir Surveillance Report 9
3: Results and analysis of production and injection log surveys, temperature, tracer
surveys, observation well surveys and special monitoring.
Qannik had flowing bottomhole pressure surveys performed on two wells. Results are:
CD2-464 (7/24/10): 570 psi, 89 DegF, Tubing O.D. 3-1/2”, I.D. 2.992”
CD2-464 (7/31/10): 510 psi, 89 DegF, Tubing O.D. 3-1/2”, I.D. 2.992”
CD2-470 (7/27/10): 550 psi, 86 DegF, Tubing O.D. 3-1/2”, I.D. 2.992”
CD2-470 (7/31/10): 480 psi, 86 DegF, Tubing O.D. 3-1/2”, I.D. 2.992”
4: Review of Qannik Pool Production Allocation Factors and Issues.
The WNS Field Production Allocation Factors are used to allocate production within the Qannik
Pool.
5: Progress of Enhanced Recovery Projects
Qannik enhanced recovery projects continue with waterflood, for pressure maintenance and
improved recovery.
6. Reservoir management summary including results of any reservoir simulation studies.
Cumulative water injection equates to roughly 5% of the hydrocarbon pore volume of the
developed portion of the reservoir. As would be expected for such an immature flood, water
production remains low at roughly 1% of total liquid production. Water breakthrough is not
anticipated until the flood reaches a minimum cumulative injection maturity of 10% HCPVI.
Given the high efficiency of injected water in the Qannik flood, injection into the reservoir is
maximized by maintaining bottomhole injection pressures as high as possible without exceeding
the parting pressure of the cap rock. Work is underway to investigate options for increasing
injectivity of the three central injectors.
A reservoir simulation model of the Qannik reservoir covering the developed area and most of
the remaining undeveloped acreage has been updated to match performance data through the
end of 2010. The model is being used to evaluate options for increasing flood throughput rates
for the CD2 development and future development potential accessible from CD3 and CD4.
2010 CRU Reservoir Surveillance Report 10
Attachment 1 Colville River Unit
±0120.5
Miles
Colville River Unit
Current Participating Areas
CRU_PA.mxd CSR 2/24/2011
CD3
CD2 CD1
CD4
QANNIK PA
ALPINE PA
FIORD NECHELIK PA
FIORD KUPARUK PA
NANUQ KUPARUK PA
NANUQ
NANUQ
PA
COLVILLE RIVER UNIT
2010 CRU Reservoir Surveillance Report 11
Attachment 2 Reservoir Pressure Maps at Datum
2010 CRU Reservoir Surveillance Report 12
2010 CRU Reservoir Surveillance Report 13
2010 CRU Reservoir Surveillance Report 14
2010 CRU Reservoir Surveillance Report 15
Attachment 3 10-412 Pressure Survey Results by Pool
2010 CRU Reservoir Surveillance Report 20
Attachment 4 Surface Safety Valve Testing 2010
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODE1Rich Ligenza1/4/2010Mike GravesAlpine/ CRU / CD1 MISC Waived164 CD1-04 2001170 164 100 100 P P 9 1/2/2010 OILCD1-04 Seviced, Tested, Passed 1/2/2010CD1-42 Serviced, Tested, Passed 1/4/20102Rich Ligenza1/4/2010Mike GravesAlpine/ CRU / CD1 MISC Waived164 CD1-42 1991190 161 1850 1850 P P 8 1/4/2010 GINJCD1-04 Seviced, Tested, Passed 1/2/2010CD1-42 Serviced, Tested, Passed 1/4/20103Rich Ligenza1/8/2010Jody DoanAlpine/ CRU / CD3 MISC Waived158 CD3-118 2080250 158 1850 1850 P P 8 1/2/2010 GINJCD3-118 serviced, tested, passed 1/2/2010CD3-316A serviced, tested, passed 1/8/20104Rich Ligenza1/8/2010Jody DoanAlpine/ CRU / CD3 MISC Waived158 CD3-316A 2080110 158 1850 1850 P P 8 1/8/2010 GINJCD3-118 serviced, tested, passed 1/2/2010CD3-316A serviced, tested, passed 1/8/20105Rich Ligenza1/8/2010Gary DavisAlpine/ CRU / CD4 MISCLou GrimaldiCD4-214 2061450 3200 1850 1850 P P P GINJ IA=3200, OA=315, T=3200 NN6Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-107 2061890 150 100 100 P P 9 1/25/2010 OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/107Alexander1/25/2010QuigleyAlpine/ CRU / CD3 RETEST Waived150 CD3-107 2061890 150 100 NT NT P 1/25/2010 OIL CD3-107 SSSV flushed with Hot AHF and retest Passed8Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-108 2050330 1/7/2010 SICD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/109Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-109 2050590 150 100 95 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1010Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-110 2050410 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1011Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-111 2060300 150 100 100 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1012Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-112 2060320 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1013Alexander1/25/2010QuigleyAlpine/ CRU / CD3 MISC Waived150 CD3-113 2070040 150 100 NT NT P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1014Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-113 2070040 150 100 100 P P NT OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1015Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-114 2070330 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1016Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-115 2090060 150 100 100 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1017Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-117 2090260 150 100 95 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1018Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-118 2080250 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1019Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-301 2070230 6/3/2008 SICD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1020Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-302 2060100 12/6/2009 SICD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1021Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-303 2080130 150 100 100 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1022Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-304 2090280 150 100 90 P P P OILCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1023Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-305 2081930 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1024Alexander1/25/2010QuigleyAlpine/ CRU / CD3C. Scheve150 CD3-316A 2080110 WAGCD3-107 SSSV Serviced, retested, passed, 1/25/10CD3-113 SSSV TRDP locked out.CD3-107, 109, 111, 115, 117, 303, 304 all tested 1/24/1025Rich Ligenza2/2/2010Mike GravesAlpine/ CRU / CD1 MISC WaivedCD1-11 2041800 159 1850 1850 P P 9 2/3/2010 GINJ CD1-11 Serviced, tested, passed.26Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-01 1990460 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1027Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-02 2001720 12/1/2009 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1028Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-03 1991200 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/10Well TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarksColville River Unit Safety Valve Testing1 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks29Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-04 2001170 157 100 98 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1030Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-05 1991280 4/12/2009 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1031Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-06 2000830 1850 1850 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1032Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-07 2032250 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1033Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-08 2040590 157 100 100 P 4 P 3/7/2010 OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1034Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-09 2000710 7/18/2008 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1035Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-10 2001710 8/19/2007 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1036Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-11 2041800 1850 1850 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1037Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-12 2042050 157 100 102 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1038Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-13 1990520 4/14/2009 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1039Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-14 2010380 1850 1854 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1040Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-16 1990940 1850 1846 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1041Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-17 2001450 156 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1042Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-18 2042060 156 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1043Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-20 2042400 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1044Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-21 2010060 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1045Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-229 2002150 5/10/2006 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1046Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-22A 2001100 12/12/2008 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1047Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-23 1990630 2/11/2010 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1048Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-24 1990260 157 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1049Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-25 2000080 157 100 102 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1050Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-26 1990880 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1051Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-27 2000060 157 100 97 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1052Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-28 2001990 157 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1053Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-30 2001320 12/1/2007 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1054Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-31 2001180 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1055Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-32 1991040 157 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1056Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-33 2002120 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1057Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-34 2000430 157 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1058Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-35 1990380 157 100 104 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1059Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-36 1991120 1850 1843 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1060Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-37 1990670 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/10Colville River Unit Safety Valve Testing2 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks61Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-38 2000030 157 100 95 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1062Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-39 1990800 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1063Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-40 1990440 156 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1064Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-41 2000170 157 10 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1065Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-42 1991190 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1066Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-43 2001060 156 100 102 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1067Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-44 2000550 158 100 100 P P P OILCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1068Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-45 1991010 WAGCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1069Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-46 2040240 1850 1854 P P P GINJCD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1070Alexander3/7/2010Tim SmithAlpine / CRU / CD1 Waived150 CD1-48 2090010 3/6/2010 SICD1-04, 06, 08,11,12,14,16, 17, 18 Tested on 3/6/10CD1-08 SSV serviced and retested 3/7/1071Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-01 2051180 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1072Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-02 2051090 1850 1849 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1073Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-03 2050920 2/15/2010 SICD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1074Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-05 2040970 160 100 100 P P 9 3/11/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1075Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-06 2031590 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1076Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-07 2031870 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1077Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-08 2022500 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1078Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-09 2041290 160 100 97 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1079Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-10 2031950 160 100 99 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1080Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-11 2051320 1850 1843 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1081Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-12 2030730 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1082Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-13 2022030 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1083Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-14 2011770 160 100 101 P P 9 3/18/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1084Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-15 2011590 1850 1836 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1085Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-16 2021440 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10Colville River Unit Safety Valve Testing3 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks86Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-17A 2050170 1850 1842 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1087Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-18 2031510 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1088Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-19 2021120 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1089Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-20 2031050 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1090Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-21 2042450 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1091Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-22 2020920 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1092Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-23 2021340 160 100 97 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1093Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-24 2010950 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1094Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-25 2020740 160 100 96 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1095Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-26 2012320 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1096Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-27 2031770 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1097Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-28 2022170 160 100 99 P P 9 3/20/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1098Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-29 2021480 1850 1847 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/1099Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-30 2031350 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10100Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-31 2040820 160 100 96 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10101Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-32 2020290 1850 1848 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10102Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-33B 2011250 160 100 99 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10103Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-34 2011910 160 100 98 P P 9 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10104Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-35A 2022440 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10105Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-36 2030140 2/9/2010 SICD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10106Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-37 2022110 160 100 97 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10Colville River Unit Safety Valve Testing4 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks107Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-38 2021710 1850 1850 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10108Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-39 2011600 160 100 98 P P 9 3/20/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10109Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-40 2031260 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10110Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-404 2060540 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10111Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-41 2021260 160 100 97 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10112Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-42 2010670 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10113Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-43 2031970 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10114Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-44 2021650 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10115Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-45 2012120 160 100 99 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10116Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-46 2020820 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10117Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-463 2081070 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10118Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-464 2080820 160 100 80 3 P P 3/10/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10119Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-465 2081450 160 100 99 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10120Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-468 2081800 160 100 101 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10121Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-469 2081220 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10122Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-47 2012050 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10123Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-470 2081290 160 100 99 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10124Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-48 2021080 1850 1843 P P P WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10125Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-49 2012490 12/8/2009 SICD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10126Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-50 2020490 160 100 96 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10127Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-51 2022490 1850 1844 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10Colville River Unit Safety Valve Testing5 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks128Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-52 2030930 160 100 97 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10129Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-53 2040890 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10130Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-54 2041780 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10131Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-55 2031180 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10132Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-56 2041500 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10133Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-57 2040720 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10134Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-58 2030850 160 100 96 P P 9 3/10/2010 OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10135Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-59 2042480 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10136Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-60A 2091150 WAGCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10137Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-72 2070570 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10138Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-73 2081960 1850 1846 P P P GINJCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10139Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-74 2081970 160 100 101 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10140Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-75 2080640 160 100 98 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10141Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-76 2090980 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10142Alexander3/10/2010Gary SAlpine / CRU / CD2 Waived160 CD2-78 2090660 160 100 100 P P P OILCD2-01,02,05,09,10, 11,13,14, 15,17,19,20,21,23,24 TESTED 3/9/10SSSV`s that failed were serviced and retested per the dates aboveCD2-34 SSSV is being locked out and new WRDP installed. 3/23/10CD2-464 LPP repaired, tested, passed 3/10/10143Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-05 2071550 150 100 100 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10144Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-07 2071180 150 100 100 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10145Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-16 2061310 150 100 95 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10146Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-17 2061180 1850 1850 P P P GINJCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10147Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-208 2051620 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10148Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-209 2060650 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10149Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-210 2060770 10/12/2009 SICD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10150Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-211 2061530 150 100 100 P P 9 4/21/2010 OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10151Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-214 2061450 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10152Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-215 2061570 150 100 95 P P 9 4/21/2010 OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10Colville River Unit Safety Valve Testing6 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks153Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-24 2090970 150 100 100 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10154Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-26 2090490 1850 1840 P P P GINJCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10155Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-301B 2071800 150 100 100 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10156Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-302 2070560 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10157Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-304 2071320 150 100 100 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10158Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-306 2070940 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10159Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-318A 2061130 150 150 130 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10160Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-319 2051480 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10161Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-320 2060550 150 150 130 P P P OILCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10162Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-321 2061420 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10163Alexander4/17/2010WellerAlpine/ CRU / CD4 Chuck Sheeve150 CD4-322 2071010 WAGCD4-211 SSSV serviced , retested, passed 4/21/10CD4-215 SSSV serviced, retested, passed 4/21/10164Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-106 2100010 145 100 101 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10165Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-107 2061890 145 100 100 P P 8 4/30/2010 OIL CD3-107 SSSV was serviced and passed retest on 04/30/10166Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-108 2050330 GINJ CD3-107 SSSV was serviced and passed retest on 04/30/10167Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-109 2050590 145 100 99 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10168Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-110 2050410 WAG CD3-107 SSSV was serviced and passed retest on 04/30/10169Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-111 2060300 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10170Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-112 2060320 GINJ CD3-107 SSSV was serviced and passed retest on 04/30/10171Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-113 2070040 145 100 101 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10172Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-114 2070330 WAG CD3-107 SSSV was serviced and passed retest on 04/30/10173Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-115 2090060 145 100 99 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10174Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-117 2090260 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10175Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-118 2080250 GINJ CD3-107 SSSV was serviced and passed retest on 04/30/10176Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-122 2091530 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10177Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-124 2100080 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10178Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-301A 2070230 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10179Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-302A 2060100 12/6/2009 SI CD3-107 SSSV was serviced and passed retest on 04/30/10180Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-303 2080130 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10181Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-304 2090280 145 100 100 P P P OIL CD3-107 SSSV was serviced and passed retest on 04/30/10182Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-305 2081930 GINJ CD3-107 SSSV was serviced and passed retest on 04/30/10183Rich Ligenza4/26/2010Dan AndrusAlpine/ CRU / CD3 Bob Noble167 CD3-316A 2080110 WAG CD3-107 SSSV was serviced and passed retest on 04/30/10184Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-106 2100010 OIL Waived by Bob Noble.Colville River Unit Safety Valve Testing7 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks185Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-107 2061890 OIL Waived by Bob Noble.186Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-108 2050330 1850 1850 P P P GINJ Waived by Bob Noble.187Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-109 2050590 OIL Waived by Bob Noble.188Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-110 2050410 WAG Waived by Bob Noble.189Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-111 2060300 OIL Waived by Bob Noble.190Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-112 2060320 1850 1850 P P P GINJ Waived by Bob Noble.191Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-113 2070040 OIL Waived by Bob Noble.192Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-114 2070330 WAG Waived by Bob Noble.193Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-115 2090060 OIL Waived by Bob Noble.194Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-117 2090260 OIL Waived by Bob Noble.195Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-118 2080250 1850 1850 P P P GINJ Waived by Bob Noble.196Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-122 2091530 OIL Waived by Bob Noble.197Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-124 2100080 OIL Waived by Bob Noble.198Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-301A 2070230 OIL Waived by Bob Noble.199Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-302A 2060100 12/6/2009 SI Waived by Bob Noble.200Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-303 2080130 OIL Waived by Bob Noble.201Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-304 2090280 OIL Waived by Bob Noble.202Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-305 2081930 1850 1850 P P P GINJ Waived by Bob Noble.203Rich Ligenza4/27/2010Dan AndrusAlpine/ CRU / CD3 WaivedCD3-316A 2080110 WAG Waived by Bob Noble.204Rich Ligenza5/24/2010Jody DoanAlpine / CRU / CD1 MISC Waived160 CD1-34 2000430 160 100 99 P P P OIL CD1-34 has new K-valve.Jeff Jones waived witnessing test.Will witness the next time they come to Alpine205Rich Ligenza6/10/2010Jody DoanAlpine/ CRU / CD3 MISC Waived157 CD3-114 2070330 1850 1848 P P P GINJ CD3-316A SSSV scheduled to be serviced and retested within 2 weeks206Rich Ligenza6/10/2010Jody DoanAlpine/ CRU / CD3 MISC Waived157 CD3-316A 2080110 1850 1852 P P 9 GINJ CD3-316A SSSV scheduled to be serviced and retested within 2 weeks207Alexnader7/3/2010Ace GlansbeekAlpine/ CRU / CD2 MISC Waived155 CD2-12 2030730 1850 1850 P P P GINJ AOGCC waived witness Bob Nobles208Alexnader7/3/2010Ace GlansbeekAlpine/ CRU / CD2 MISC Waived155 CD2-22 2020920 1850 1850 P P P GINJ AOGCC waived witness Bob Nobles209Alexander7/4/2010Levi ForrestAlpine/ CRU / CD1 MISC Waived156 CD1-42 1991190 1850 1850 P P P GINJ AOGCC waived witness210Alexander7/4/2010Levi ForrestAlpine/ CRU / CD1 MISC Waived156 CD1-45 1991010 1850 1850 P P P GINJ AOGCC waived witness211Alexander7/5/2010Levi ForrestAlpine/ CRU / CD4 MISC WaivedCD4-322 2071010 1850 1850 P P P GINJ AOGCC waived witness Bob Nobles212Rich Ligenza7/17/2010Levi ForrestAlpine/ CRU / CD4 MISCBob Noble145 CD4-214 2061450 145 100 100 P P OIL CD4-214 Temporary flow line is flanged pipe operating at 275 FTP.Colville River Unit Safety Valve Testing8 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks213Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-106 2100010 156 100 98 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.214Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-107 2061890 156 100 96 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.215Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-108 2050330 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.216Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-109 2050590 156 100 100 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.217Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-110 2050410 1850 1827 P 4 P 7/26/2010 GINJCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.218Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-111 2060300 156 100 102 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.219Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-112 2060320 1850 1848 P P P GINJCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.220Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-113 2070040 156 100 101 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.221Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-114 2070330 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.222Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-115 2090060 156 100 99 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.223Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-117 2090260 156 100 101 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.224Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-118 2080250 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.225Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-121 2100220 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.226Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-122 2091530 156 100 96 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.227Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-123 2100310 156 100 100 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.228Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-124 2100080 156 100 99 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.229Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-301A 2100170 156 100 101 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.230Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-302A 2100350 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.231Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-303 2080130 156 100 99 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.232Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-304 2090280 156 100 97 P P P OILCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.233Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-305 2081930 1850 1850 P P P GINJCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.Colville River Unit Safety Valve Testing9 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks234Rich Ligenza7/27/2010Pat MizeAlpine/ CRU / CD3 Waived156 CD3-316A 2080110 WAGCD3-110 SSV was serviced and passed retest on 07/26/10Tested 7/25 - CD3-106, 108, 109, 111, 113, 115, 117, 123, 124, 301A, 303, 304.Tested 7/26 - CD3-107, 110, 305. Tested 7/27 - CD3-112.235Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-01 1990460 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10236Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-02 2001720 12/1/2009 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10237Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-03 1991200 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10238Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-04 2001170 9/13/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10239Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-05 1991280 4/12/2009 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10240Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-06 2000830 1850 1875 P P P GINJWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10241Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-07 2032250 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10242Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-08 2040590 7/17/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10243Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-09 2000710 7/18/2008 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10244Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-10 2001710 8/19/2007 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10245Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-11 2041800 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10246Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-12 2042050 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10247Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-13 1990520 6/23/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10248Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-14 2010380 1850 1850 P P P GINJWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10249Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-16 1990940 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10250Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-17 2001450 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10251Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-18 2042060 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10252Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-20 2042400 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10253Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-21 2010060 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10254Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-229 2002150 5/10/2006 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10Colville River Unit Safety Valve Testing10 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks255Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-22A 2001100 12/12/2008 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10256Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-23 1990630 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10257Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-24 1990260 152 100 98 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10258Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-25 2000080 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10259Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-26 1990880 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10260Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-27 2000060 152 100 97 P P 9 9/16/2010 OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10261Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-28 2001990 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10262Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-30 2001320 5/4/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10263Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-31 2001180 8/26/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10264Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-32 1991040 6/7/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10265Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-33 2002120 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10266Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-34 2000430 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10267Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-35 1990380 152 100 97 P P 9 9/16/2010 OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10268Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-36 1991120 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10269Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-37 1990670 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10270Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-38 2000030 152 100 98 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10271Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-39 1990800 8/26/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10272Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-40 1990440 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10273Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-41 2000170 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10274Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-42 1991190 1850 1848 P P P GINJWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10275Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-43 2001060 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10Colville River Unit Safety Valve Testing11 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks276Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-44 2000550 152 100 99 P P P OILWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10277Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-45 1991010 1850 1849 P P P GINJWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10278Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-46 2040240 WAGWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10279Rich Ligenza9/14/2010Jody DoanAlpine/ CRU / CD1 Waived152 CD1-48 2090010 4/23/2010 SIWaived by Jim Regg on 9/08/2010.CD1-27 SSSV was serviced and passed retest on 09/16/10CD1-35 SSSV was serviced and passed retest on 09/16/10280Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-01 2051180 155 100 100 P P 9 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78281Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-02 2051090 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78282Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-03 2050920 155 100 100 P P 9 9/21/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78283Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-05 2040970 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78284Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-06 2031590 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78285Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-07 2031870 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78286Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-08 2022500 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78287Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-09 2041290 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78288Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-10 2031950 7/25/2010 SICD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78289Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-11 2051320 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78290Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-12 2030730 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78291Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-13 2022030 155 100 101 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78292Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-14 2011770 155 100 98 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78Colville River Unit Safety Valve Testing12 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks293Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-15 2011590 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78294Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-16 2021440 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78295Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-17A 2050170 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78296Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-18 2031510 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78297Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-19 2021120 155 100 97 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78298Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-20 2031050 155 100 101 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78299Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-21 2042450 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78300Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-22 2020920 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78301Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-23 2021340 155 100 101 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78302Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-24 2010950 155 100 99 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78303Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-25 2020740 155 100 101 P P 9 9/21/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78304Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-26 2012320 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78305Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-27 2031770 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78306Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-28 2022170 155 100 101 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78307Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-29 2021480 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78308Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-30 2031350 GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78Colville River Unit Safety Valve Testing13 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks309Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-31 2040820 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78310Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-32 2020290 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78311Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-33B 2011250 155 100 99 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78312Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-34 2011910 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78313Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-35A 2022440 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78314Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-36 2030140 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78315Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-37 2022110 155 100 99 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78316Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-38 2021710 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78317Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-39 2011600 155 100 98 P P 9 9/19/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78318Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-40 2031260 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78319Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-41 2021260 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78320Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-42 2010670 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78321Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-43 2031970 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78322Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-44 2021650 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78323Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-45 2012120 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78324Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-46 2020820 GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78Colville River Unit Safety Valve Testing14 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks325Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-463 2081070 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78326Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-464 2080820 155 100 100 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78327Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-465 2081450 155 100 102 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78328Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-468 2081800 155 100 100 P P 9 9/20/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78329Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-469 2081220 155 100 98 P P 9 9/20/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78330Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-47 2012050 155 100 NT NT 8 9/30/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78331Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-470 2081290 155 100 92 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78332Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-48 2021080 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78333Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-49 2012490 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78334Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-50 2020490 155 100 98 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78335Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-51 2022490 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78336Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-52 2030930 155 100 101 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78337Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-53 2040890 155 100 99 P P P OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78338Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-54 2041780 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78339Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-55 2031180 9/13/2010 SICD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78340Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-56 2041500 8/7/2010 SICD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78Colville River Unit Safety Valve Testing15 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks341Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-57 2040720 1850 1850 P P P GINJCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78342Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-58 2030850 155 100 98 P P 9 9/21/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78343Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-59 2042480 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78344Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-60A 2091150 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78345Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-72 2070570 155 100 100 P P 9 9/20/2010 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78346Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-73 2081960 WAGCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78347Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-74 2081970 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78348Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-75 2080640 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78349Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-76 2090980 7/19/2010 SICD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78350Rich Ligenza9/18/2010Robert QuigleyAlpine/ CRU / CD2Bob Noble155 CD2-78 2090660 OILCD2-47 K-Valve failed to close. Sundry approved on 9/22 to replace K-Valve.Valve replaced on 9/30/10. K-valve trips at 269 psig. Available for witness at any time.All tests witnessed by Bob Noble except for; CD2-30, CD2-46, CD2-47 LPP & SSV, CD2-74, CD2-75 and CD2-78351Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-01 2051180 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010352Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-02 2051090 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010353Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-03 2050920 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010354Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-05 2040970 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010355Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-06 2031590 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010356Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-07 2031870 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010357Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-08 2022500 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010358Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-09 2041290 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010359Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-10 2031950 7/25/2010 SI Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010360Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-11 2051320 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010361Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-12 2030730 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010362Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-13 2022030 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010Colville River Unit Safety Valve Testing16 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks363Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-14 2011770 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010364Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-15 2011590 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010365Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-16 2021440 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010366Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-17A 2050170 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010367Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-18 2031510 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010368Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-19 2021120 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010369Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-20 2031050 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010370Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-21 2042450 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010371Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-22 2020920 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010372Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-23 2021340 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010373Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-24 2010950 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010374Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-25 2020740 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010375Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-26 2012320 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010376Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-27 2031770 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010377Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-28 2022170 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010378Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-29 2021480 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010379Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-30 2031350 1850 1850 P P P GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010380Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-31 2040820 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010381Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-32 2020290 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010382Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-33B 2011250 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010383Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-34 2011910 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010384Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-35A 2022440 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010385Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-36 2030140 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010386Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-37 2022110 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010387Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-38 2021710 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010388Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-39 2011600 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010389Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-40 2031260 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010390Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-41 2021260 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010391Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-42 2010670 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010392Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-43 2031970 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010393Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-44 2021650 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010394Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-45 2012120 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010Colville River Unit Safety Valve Testing17 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks395Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-46 2020820 1850 1850 P P P GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010396Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-463 2081070 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010397Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-464 2080820 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010398Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-465 2081450 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010399Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-468 2081800 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010400Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-469 2081220 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010401Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-47 2012050 155 100 97 P P P OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010402Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-470 2081290 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010403Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-48 2021080 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010404Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-49 2012490 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010405Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-50 2020490 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010406Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-51 2022490 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010407Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-52 2030930 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010408Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-53 2040890 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010409Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-54 2041780 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010410Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-55 2031180 9/13/2010 SI Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010411Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-56 2041500 8/7/2010 SI Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010412Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-57 2040720 GINJ Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010413Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-58 2030850 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010414Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-59 2042480 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010415Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-60A 2091150 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010416Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-72 2070570 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010417Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-73 2081960 WAG Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010418Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-74 2081970 155 100 96 P P P OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010419Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-75 2080640 155 100 98 P P 9 9/20/2010 OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010420Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-76 2090980 7/19/2010 SI Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010421Rich Ligenza9/19/2010Robert QuigleyAlpine/ CRU / CD2 Waived155 CD2-78 2090660 155 100 100 P P P OIL Waived by Bob Noble. CD2-75 SSSV was serviced and passed retest on 09/2010422Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-05 2071550 150 100 95 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10423Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-07 2071180 150 100 97 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10424Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-12 2100910 150 100 90 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10425Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-16 2061310 150 100 95 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10426Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-17 2061180 WAG CD4-304 SSV was serviced and passed retest on 10/10/10Colville River Unit Safety Valve Testing18 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks427Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-209 2060650 7/9/2010 SI CD4-304 SSV was serviced and passed retest on 10/10/10428Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-210 2060770 10/9/2010 SI CD4-304 SSV was serviced and passed retest on 10/10/10429Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-211 2061530 150 100 95 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10430Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-214 2061450 WAG CD4-304 SSV was serviced and passed retest on 10/10/10431Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-215 2061570 10/1/2010 SI CD4-304 SSV was serviced and passed retest on 10/10/10432Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-23 2100670 150 100 98 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10433Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-24 2090970 9/11/2010 SI CD4-304 SSV was serviced and passed retest on 10/10/10434Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-26 2090490 WAG CD4-304 SSV was serviced and passed retest on 10/10/10435Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-301B 2071800 150 100 98 P P P OIL CD4-304 SSV was serviced and passed retest on 10/10/10436Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-302 2070560 GINJ CD4-304 SSV was serviced and passed retest on 10/10/10437Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-304 2071320 150 100 95 P P 9 10/10/2010 OIL CD4-304 SSV was serviced and passed retest on 10/10/10438Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-319 2051480 WAG CD4-304 SSV was serviced and passed retest on 10/10/10439Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-321 2061420 WAG CD4-304 SSV was serviced and passed retest on 10/10/10440Alexander10/9/2010B.SaulAlpine/ CRU / CD4Robert Nobel150 CD4-322 2071010 9/26/2010 SI CD4-304 SSV was serviced and passed retest on 10/10/10441Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-106 2100010 150 100 101 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired442Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-107 2061890 150 100 100 P P 9 OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired443Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-108 2050330 1850 1849 P P P GINJ CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired444Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-109 2050590 150 100 97 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired445Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-110 2050410 1850 1847 P P P GINJ CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired446Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-111 2060300 150 100 98 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired447Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-112 2060320 1850 1850 P P P GINJ CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired448Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-113 2070040 150 100 98 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired449Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-114 2070330 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired450Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-115 2090060 150 100 99 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired451Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-117 2090260 150 100 98 P P 9 OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired452Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-118 2080250 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired453Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-121 2100220 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired454Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-122 2091530 150 100 96 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired455Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-123 2100310 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired456Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-124 2100080 150 100 95 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired457Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-301A 2100170 150 100 98 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired458Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-302A 2100350 1850 1849 P P P GINJ CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repairedColville River Unit Safety Valve Testing19 of 202010 Pool Surveillance Report
SEPAR PSI WELL DATA PILOTS SSV SSSVLPS HPSWELL NUMBERPERMIT NUMBERSEPAR PSISET PSIL/P TRIPLPP TEST CODETEST CODETEST CODEWell TypeAlaska Oil and Gas Conservation Commission Safety Valve System Test Reports Wells Operated By ConocoPhillipsDate passed Retest or Date Shut InSUBMITTED BYTEST DATEOPERATOR REPFIELD/UNIT/PADAOGCC REPRemarks459Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-303 2080130 150 100 98 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired460Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-304 2090280 150 100 99 P P P OIL CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired461Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-305 2081930 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired462Alexander10/10/2010Jody DoanAlpine/ CRU / CD3Robert Noble150 CD3-316A 2080110 WAG CD3-107 & CD3-117 failed to hold DP on SSSV. Have put on the wire line work list to be repaired463Alexander10/10/2010B. SaulAlpine/ CRU / CD4 waived150 CD4-302 2070560 1850 1848 P P P GINJRobert Nobel was at CD3 to witness state testing and allowed CPAI to finish CD4 test.CD4-320 failed test on 10-10-10 and is on Wire line list to repair464Alexander10/10/2010B. SaulAlpine/ CRU / CD4 waived150 CD4-318A 2061130 150 150 P P P OILRobert Nobel was at CD3 to witness state testing and allowed CPAI to finish CD4 test.CD4-320 failed test on 10-10-10 and is on Wire line list to repair465Alexander10/10/2010B. SaulAlpine/ CRU / CD4 waived150 CD4-320 2060550 150 148 P P 9 OILRobert Nobel was at CD3 to witness state testing and allowed CPAI to finish CD4 test.CD4-320 failed test on 10-10-10 and is on Wire line list to repair466Alexander10/12/2010Jody DoanAlpine/ CRU / CD3 RETEST none150 CD3-107 2061890 150 NT NT P OIL CD3-107 & CD3-117 had s-line exersize TRDP. Retest good467Alexander10/12/2010Jody DoanAlpine/ CRU / CD3 RETEST none150 CD3-117 2090260 150 NT NT P OIL CD3-107 & CD3-117 had s-line exersize TRDP. Retest good468Alexander10/16/2010B. SaulAlpine/ CRU / CD4 RETEST waived150 CD4-320 2060550 150 NT NT P OIL CD4-320 Wire line pulled WRDP and re-ran new valve. Closure test good469Rich Ligenza11/21/2010Pat MizeAlpine/ CRU / CD3 MISC Waived156 CD3-114 2070330 1850 1850 P P P GINJ CD3-316A SSSV Failed to hold, Scheduled for service or SI within 14 days.470Rich Ligenza11/21/2010Pat MizeAlpine/ CRU / CD3 MISC Waived156 CD3-118 2080250 1850 1850 P P P GINJ CD3-316A SSSV Failed to hold, Scheduled for service or SI within 14 days.471Rich Ligenza11/21/2010Pat MizeAlpine/ CRU / CD3 MISC Waived156 CD3-121 2100220 1850 1850 P P P GINJ CD3-316A SSSV Failed to hold, Scheduled for service or SI within 14 days.472Rich Ligenza11/21/2010Pat MizeAlpine/ CRU / CD3 MISC Waived156 CD3-316A 2080110 1850 1850 P P 9 GINJ CD3-316A SSSV Failed to hold, Scheduled for service or SI within 14 days.473Albright12/21/2010AlbrightAlpine/ CRU / CD2 MISC WaivedCD2-35A 2022440 1850 1850 P P P GINJJeff Jones waived inspection on 12/21.CD2-35 SSSV failed function test pre WAG. Repaired on 12/19.474Albright12/23/2010Justin LloydAlpine/ CRU / CD3 MISC waivedCD3-305 2081930 1850 1850 P P P GINJ Jeff Jones waived inspection 12/21/2010Colville River Unit Safety Valve Testing20 of 202010 Pool Surveillance Report