Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2010 Deep Creek UnitChevron Erin O'Brien-Authier Union Oil Company of California
Petroleum Engineer 3800 Centerpoint Dr., Suite 100
MCA Asset Development Anchorage, AK 99503
Ift— 0.0 Tel 907 263 7653
Fax 907 263 7698
Email eodm@chevron.com
RECEIID
LIAR 0 3 2"'
March 1, 2011 A�11ka oil & Gas conB.000masnm
"�i3�h0i8ge
Daniel Seamount, Chairman
Alaska Oil & Gas Conservation Commission
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501-3539
DEEP CREEK UNIT
HAPPY VALLEY FIELD
STATE OF ALASKA
2010 ANNUAL RESERVOIR REVIEW
Dear Commissioner Seamount:
In accordance with Conservation Order No. 553, Union Oil Company of California
("Union"), as Operator, respectfully submits the following Annual Reservoir Review
for the Happy Valley Field.
This is the 6th Annual Reservoir Review and corresponds to events during the 2010
calendar year. Note that the Happy Valley Field has been on production since
November 2004.
Production Update
At the end 2009, the Beluga formation was perforated in HV -11. Rate was
estimated to be less than 50 mcfd from the Tyonek prior to adding perforations.
On December 22, 2009, perforations were shot in Beluga B-100, B-90 and B-80.
Very little pressure response was noted after any of the added perforations. No
flow was measured after the perforations and an apparent fluid level rise. The well
remained shut in during 2010.
As of December 31St, 2010, the cumulative production from the Happy Valley field
was 16,337,859 Mcf of gas and 44,249 Bbl of water. Seven (7) Happy Valley wells
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
produced during 2010. The wells are currently producing at the following rates:
a.
HV -A01 - Lower Tyonek
Producer.
Current rate
—1.0
MMcf/d & 2
bwpd,
at
262 psig FTP.
b.
HV -A02 - Lower Tyonek
Producer.
Current rate
—0.3
MMcf/d & 3
bwpd,
at
256 psig FTP.
c.
HV -A08 - Beluga and Upper
Tyonek Producer. Current
rate —0.4
MMcf/d
&
2 bwpd, at 264 psig FTP.
d.
HV -A09 - Upper Tyonek
Producer.
Current rate
—1.2
MMcf/d & 2
bwpd,
at
266 psig FTP.
e.
HV -A10 - Upper Tyonek
Producer.
Current rate
—1.8
MMcf/d & 0
bwpd,
at
282 psig FTP.
f.
HV -A11 - Beluga and Upper Tyonek Producer. HV -A11
is currently
shut-in.
g.
HV -11312 - Lower Tyonek
Producer.
Current rate
—0.5
MMcf/d & 2
bwpd,
at
281 psig FTP.
h.
HV -B13 - Upper Tyonek
Producer.
Current rate
—0.4
MMcf/d & 1
bwpd,
at
277 psig FTP.
Appendix A contains the production plots for each Happy Valley well.
Reservoir Pressure
There are currently two different formations (Beluga & Tyonek) and numerous sand
intervals open to production at Happy Valley. Because all of the Happy Valley wells
have commingled production (from numerous intervals), it is difficult to obtain
individual reservoir pressures and is thus difficult to calculate Gas -in-place volumes
from material balance. Secondly, very few pressure data points have been taken
over the past few years, due to the fact that most wells produce some water with
the commingled gas. Shutting in a well that makes any appreciable amount of
water puts the gas production/reserves at risk.
No downhole Happy Valley reservoir pressure information was gathered during
2010.
Cumulative Production
As previously mentioned the cumulative production from the Happy Valley field was
16,337,859 Mcf of gas and 44,249 Bbl of water, through December 31St, 2010. The
cumulative produced gas volumes, sub -divided by well and formation (through
12/31/2010) are as follows:
Beluga Upper Tyonek Lower Tyonek
HV -A01 3,708,274
HV -A02 819,328
HV -A08 695,654 1,043,481
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
HV -A09
2,868,094
HV -A10
6,354,711
HV -A11
135,554 0
HV -612
442,650
HV -1313
270,113
Cum Gas Volume
MCF
695,654 10,671,953 4,970,252
Reservoir Summary
Beluga - The Beluga formation is currently open in only the HV -A8, HVA11 and HV -
B13 wellbores. The HV -A8 well is also producing from the Upper Tyonek formation,
at a production split of 40% Beluga and 60% Tyonek (determined from downhole
measurements). The HV -1313 wellbore is perforated in eight different Upper Tyonek
intervals, in addition to one Beluga interval (BLG-130). The latest flowing
pressure/temperature survey (12/19/09) did not show any production coming from
the BLG-130 perforations. After adding Beluga perforations in HV -A11, the well has
remained shut in, not capable of flow.
Through December, 2010, the cumulative production from the Beluga is 0.696 BCF
gas and 33,920 BW. Potential uphole Beluga pay exists in the HV -A9, HV -A10, HV -
B12, and HV -1313 wells and will be added as reservoir management allows.
Additional offset locations may exist for future development from the Pad B.
Upper Tyonek - The Upper Tyonek formation is currently open in the HV -A8, HV -
A9, HV -A10, HV -A11, and HV -1313 wellbores. The cumulative production from the
Upper Tyonek is 10.672 BCF gas and 1,476 BW. Additional Upper Tyonek potential
pay exists in the HV -A1, HV -A10, and HV -1312 wells. Additional offset locations
may exist for future development from the Pad B.
Lower Tyonek - The Lower Tyonek formation is currently open in the HV -A1, HV -
A2, and HV -1312 wellbores. The cumulative production from the Lower Tyonek is
4.970 BCF gas and 8,853 BW. The Lower Tyonek has been tested in HV -A3, HV -
A4, HV -A6, HV -A7, and HV -A11. Economically producible gas in the Lower Tyonek
has only been found in wells HV -A1, HV -A2 and HV -1312.
Pending Projects
There are currently no plans to drill any new wells at Happy Valley during the 2011
calendar year. Capillary tubing strings (chemical injection lines) are planned for
HV -A8 (already installed 2/1/11), HV -1312, HV -A2 and possibly HV -1313, to help
unload the water that is being produced with the gas. Currently, soap sticks are
being dropped in the wells everyday, which help the gas lift the produced fluids
(water & diesel from the fracs). In the case of HV -1312 and HV -1313, the capillary
tubing strings should help the wells recover more of the fluids lost to the various
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
Tyonek intervals during the fracture stimulation operations. An add-perf/re-pert is
also planned for HV-Al2 prior to running the capillary string as an attempt to get
past suspected damage in the Tyonek T-140. These two wells will continue to be
monitored to evaluate the stimulation treatments.
Testing and Monitoring
The Happy Valley wells are tested regularly (several times monthly) and allocated
production numbers are reported to the state monthly. In addition to the well
testing, the wellbores are routinely (daily) monitored for any casing or tubing
pressure anomalies.
Surface Safety Valve Testing
The SSV's were tested on April 12th and October 13th 2010. These tests were
witnessed by Bob Noble and Lou Grimaldi, respectively for the AOGCC. Currently,
the HV SSV's are operating with approved tests on all SSV's. The SSV test results
for 2010 are attached in Appendix B.
If you have any questions regarding this annual reservoir review, please contact me
at your earliest convenience (263-7653).
Sincerely,
Erin O'Brien-Authier
Attachments
Cc: Dave Whitacre, CVX
Mark Longden, CVX
Justin Black, CVX
Field Well Files, CVX
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
APPENDIX A
Happy Valley Field
Well Production Plots
Union Oil Company of California / A Chevron Company http://www.chevron.com
Dec -04 Dec -05 Dec -06 Dec -07 Dec -08 pec -09 Dec -10 Dec -11
3
CD
S
� � o
0
N �
o CD
�l<
CD
(D
¢• C
CDO
mss•
C
C
wi
3500
3000
2500
0
U2000
d
Ce
B 1500
1000
i
400
500 -� -- .. i 2nn
0 0---,--� r
Dec -03 Dec -04 Dec -0.5 Dec -06 Dec -07 Dec -08 Dec -09 Dec -10 Dec -11
1400
Happy Y Valle #8 Daily Allocated
.
Production
1200
Rate{msd/d}
..
Tubing Press
;.►•
1000
. M• . �. . • •.
800
-
'. r •
CL
0.
Ann
i
400
500 -� -- .. i 2nn
0 0---,--� r
Dec -03 Dec -04 Dec -0.5 Dec -06 Dec -07 Dec -08 Dec -09 Dec -10 Dec -11
S
2000 Happy Valley #9 Daily Allocated Production 1600
1800
1400
1600 Rate "mscf/d)
Tubing Press
1200
1400
LL 1200 1000
u
� ,on
1000 800
� a
LL
800
600
600
400
400
200 200
0 0
Dec -04 Dec -05 Dec -06 Dec -07 Dec -08 Dec -09 Dec -10 Dec -11
CD
... �
�
-� ..-
•
� r
• • ri� M
FA
3
6000 -
5000 -
4000
ri
Happy Valley #10 Daily Allocated Production
Rate(IIISC d)
• Tubing Press
� � o
6000 o
_O C
ITI
5000CD
� o
c
4000
3
700
Happy Valley #11
Daily Allocated
Production
2.500
600
— — --
Rate
• (mscf/d)
2000
500
• Tubing Press
1500
X00
a
300
LL
200
500
100
0
-
0
Dec -03
Dec -04 Dec -05 Dec -06
Dec -07
Dec -08 Dec -09 Dec -10
Dec. -11
1600
1400
1200
1000
a
LL
u
800
A
N
N
600
400
200
0
Dec -08
Happy Valley #12 Daily Allocated Production
Rate(msdild)
2000
1800
1600
1400
- 1200
00
1000
a
F -
LL
800
600
400
Dec -09 Dec -10
200
0
Dec -11
�
N �
O CD �
CD
CD
1000
u
� Rate �mscf;�d}
Happy Valley #13
Daily Allocated
Production
1600
900
i
■
1400
800
Tubing Press
1200
700
600
1000
0
U
to
500
800
a
OA
OAfu
LLL
600
300
400
200
200
100
0
0
Dec -07
Dec -08
Dec -09
Dec -10
Dec -11
�
N �
O CD �
CD
CD
u
� Rate �mscf;�d}
i
■
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
APPENDIX B
Happy Valley Field
2010 Safety Valve System Test Reports
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: Chevron Submitted By: Jamie Katz Date: 12 -Apr -10
Operator Rep: Rick Musgrove Field/Unit/Pad: Happy Valley A
AOGCC Rep: Bob Noble Separator psi: LPS 295 HPS NIS
Well Data
Well Pressures
Pilots
SSV
SSSV Test/Retest/SI Date Well Type
Well
Number
Permit
Number
Separ
PSI
Set
PSI
L/P Test
Trip Code
Test
Code
Test Date Passed Retest oil, WAG, GINJ,
Code Or Date Shut In GAS, CYCLE, sI
A-1
2030720
295
250
249
P
GAS
A-10
2041860
295
250
249
P
GAS
A-11
2042070
A-11
2042070
SI
A-2
2031130
295
2001
199
P
GAS
A-3
2032220
No
No
A-3
SI
A-4
2032230
SI
SI
A-6
2040440
SI
A-7
2041060
ISI
A-8
1 20411401
295
200
1981
P
I GAS
A-9
1 20417001
295
2001
1991
P
I GAS
No
INo
A-91
20417001
0
0
Wells: 5 Components: 10 Failures: 0 Failure Rate: o.00% LJ 90 Day
Remarks:
All wells Passed. Used Calibrated test Gauge.
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Well Pressures Report
Operator: Chevron Submitted By: Jamie Katz
Operator Rep: Rick Musgrove Field/Unit/Pad: Happy Valley A
AOGCC Rep: Bob Noble Date: 4/12/2010
Well Data
Well Pressures
Gas Lift
Waiver
Comments
Well
Number
Permit
Number
Inner
PSI
Outer
PSI
Tubing
PSI
Yes/No
Yes/No
A-1
2030720
0
0
270
No
No
A-10
2041860
0
0
320
No
No
A-11
2042070
SI
A-2
2031 130
0
0
290
No
No
A-3
2032220
SI
A-4
2032230
SI
A-6
2040440
SI
A-7
2041060
SI
A-8
2041140
0
0
198
No
INo
A-91
20417001
0
0
199
No
INo
Remarks:
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: Chevron Submitted By: Jamie Katz Date: 12 -Apr -10
Operator Rep: Rick Musgrove Fiekl/Unit/Pad: Happy Valley B
AOGCC Rep: Bob Noble Separator psi: Test 309 HPS NIS
Well Data
Pilots
SSV
SSSV
Tes&RetesdSI Date
Well Type
Well Permit
Number Number
Separ
PSI
Set
PSI
UP
Trip
Test
Code
Test
Code
Test
Code
Date Passed Retest
Or Date Shut In
oii, WAG, GMJ,
GAS, CYCLE, sl
B-13 2071510
309
200
198
P
P
NT
GAS
B-12 207123OF
309
200
198
P
P
I NT
GAS
Wells: 1 Components: 2 Failures:
Remarks:
0 Failure Rate: 0.00% u 90 Day
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Well Pressures Report
Operator: Chevron Submitted By: Jamie Katz
Operator Rep: Rick Musgrove Field/Unit/Pad: Happy Valley B
AOGCC Rep: Bob Noble Date: 4/12/2010
Well Data
Well Pressures Gas Lift
Waiver Comments
Well Permit
Number Number
Inner Outer Tubing Yes/No
PSI PSI PSI
Yes/No
B-13 2071510
0 0 0 No
No
B-12 2071230
0 0 460 No
No
Remarks:
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: Chevron Submitted By: Sandy McMillan Date: 13 -Oct- 10
Operator Rep: Matt Smith Field/Unit/Pad: Happy Valley A
AOGCC Rep: Lou Grimaldi Separator psi: LPS 270 HPS NIS
Well Data
Well Pressures Gas Lit
Pilots
Comments
SSV
SSS V Test/RetestISI Date Well Type
Well
Number
Permit
Number
Separ
PSI
Set
PSI
LIP
Trip
Test
Code
Test
Code
Test Date Passed Retest oi,, wAG, GINJ,
Code Or Date Shut In GAS, CYCLE, S1
A-1
2030720
270
200
200
P
P
10/13/2010 GAS
A-10
2041860
270
200
200
P
P
10/13/2010 GAS
A-11
2042070
A-2
2031130
0
0
263 No
1/22/2010 Sl
A-2
2031130
270
200
195
P
P
10/13/2010 GAS
A-3
2032220
SI
3/1/2004 SI
A-4
2032230
SI
A-7
3/1/2004 SI
A-6
2040440
SI
A-8
2041140
6/1/2004 SI
A-7
2041060
No
A-9
2041700
0
8/1/2004 SI
A-8
20411401
270
200
200
P
P
10/13/2010 GAS
A-91
20417001
270
200
2001
P
I P
I 10/13/2010 GAS
Wells: 5 Components: 10 Failures:
Remarks:
Failure Rate: 0.00 /o LJ 90 Day
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Well Pressures Report
Operator: Chevron Submitted By: Sandy McMillan
Operator Rep: Matt Smith Field/Unit/Pad: Happy Valley A
AOGCC Rep: Date: 10/13/2010
Well Data
Well Pressures Gas Lit
Waiver
Comments
Well
Number
Permit
Number
Inner
PSI
Outer
PSI
Tubing Yes/No
PSI
Yes/No
A-1
2030720
0
0
268 No
No
A-10
2041860
0
0
304 No
No
A-11
2042070
SI
A-2
2031130
0
0
263 No
No
A-3
2032220
SI
A-4
2032230
SI
A-6
2040440
SI
A-7
2041060
SI
A-8
2041140
0
0
269 No
No
A-9
2041700
0
0
270 No
No
Remarks:
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: Chevron Submitted By: Sandy McMillan Date: 13 -Oct -10
Operator Rep: Matt Smith Fiekl/Unit/Pad: Happy Valley B
AOGCC Rep: Lou Grimaldi Separator psi: LPS 288 HPS NIS
Well Data
Pilots
Waiver Comments
SSV
SSSV
Test/RetestlSl Date
Well Type
Well
Number
Permit
Number
Separ
PSI
Set
PSI
L/P
Trip
Test
Code
Test
Code
Test
Code
Date Passed Retest
Or Date Shut In
0i1, WAG, Gnva,
GAS, CYCLE, SI
B-13
2071510
288
200
200
P
P
10/13/2010
GAS
B-12
—FO712301
288
200
200
P
P
10/13/2010
GAS
Wells: 2 Components: 4 Failures:
Remarks:
Failure Rate: 0.00% LJ 90 Day
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Well Pressures Report
Operator: Chevron Submitted By: Sandy McMillan
Operator Rep: Matt Smith Field/UnWPad: Happy Valley B
AOGCC Rep: Date: 10/13/2010
Well Data
Well Pressures Gas Lit
Waiver Comments
Well Permit
Number Number
Inner Outer Tubing Yes/No
PSI PSI PSI
Yes/No
B-13 2071510
0 0 278 No
No
B-12 2071230
120 0 280 No
No
Remarks:
Union Oil Company of California / A Chevron Company http://www.chevron.com
2010 Annual Reservoir Review
Happy Valley Field
March 1, 2011
APPENDIX C
Happy Valley Field
Reservoir P/Z versus Cumulative Gas Plots
** Appendix C not included in this 2010 annual report **
Union Oil Company of California / A Chevron Company http://www.chevron.com