Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2010 Milne Point UnitKE March 31, 2011 Mr. Dan Seamount Alaska Oil and Gas Conservation Commission 333 W. 7th Ave # 100 Anchorage, AK 99501-3539 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. 0. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 RE: Milne Point Unit Waterflood Report, Surveillance Report, and Shut in Well Report Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool Dear Commissioner Seamount: In accordance with the requirements of Conservation Orders 205 and 432B (Kuparuk River Oil Pool), Conservation Order 477 (Schrader Bluff Oil Pool), and Conservation Order 423 (Sag River Oil Pool), the Operator of the Milne Point Unit hereby submits the consolidated Waterflood Surveillance Report for the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool, and Sag River Oil Pool. This report covers the time period January 1 through December 31, 2010. This report also contains a list of the wells at Milne Point that have been shut in for 365 days in 2010. This information is being provided in compliance with AOGCC regulation, 20 AAC 25.115 (Shut-in Wells). Due to the possible future plans for these wells it is our intent to leave the vast majority of them shut-in at this time and not to proceed with suspension or abandonment with the exception of those for which there is no future use. This report also contains a summary of performance and operational issues relating to the ASRC Unit 5 Multi Phase Flow Meter. This information is being provided in compliance with Conservation Order 550.007 (Administrative Approval for Unit 5 MPFM). The Operator of the Milne Point Unit reserves the right to alter the content of the analyses contained in this report at any time, based on the most recent surveillance information. Sincerely, e a Emembolu Base Management Manager Milne Point Unit BP Exploration (Alaska), Inc. Milne Point Unit Waterflood and Reservoir Surveillance Report for Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool January through December, 2010 Issued: March 31, 2011 Sections and Exhibits Introduction Overview Section 1: General Information Exhibits lA — lE Kuparuk River OR Pool Section 2: Kuparuk River OR Pool Exhibits 2A - 2G Schrader Bluff OR Pool Section 3: Schrader Bluff OR Pool Exhibits 3A-31 Sag River Oil Pool Section 4: Sag River Oil Pool Exhibits 4A — 4G Production/Injection Surveillance Logs Section 5: Production/Injection Well Surveillance Exhibits 5A Shut in Well Exhibit Section 6: Shut in Well Status 6A Milne Point Well Testing and ASRC Unit 5 Summary Section 7: Well Test Frequency 7A 1 FA 3 4 5 G 7 ANNUAL RESERVOIR SURVEILLANCE REPORTS MILNE POINT UNIT KUPARUK RIVER OIL POOL SCHRADER BLUFF OIL POOL SAG RIVER OIL POOL JANUARY - DECEMBER 2010 Introduction As required by Conservation Order 205 for the Kuparuk River Oil Pool, approved October 4, 1984, Conservation Order 477, approved August 23, 2002 for the Schrader Bluff Oil Pool, Conservation Order 423 for the Sag River Oil Pool, approved May 6, 1998, and Conservation Order 550.007 for all Milne Point Pools, approved January 6, 2009, this report provides a consolidated summary of surveillance activities within the Milne Point Unit. The report includes surveillance data associated with waterflood projects and development activities. The time period covered is January through December 2010. Order 205 for the Kuparuk River Oil Pool requires the Operator to submit the following for the previous calendar year: • A tabulation of reservoir pressure and injection pressure data on wells in the waterflood permit area. • A tabulation of all production logs, injection well surveys, and injection well performance data. • Produced fluid volumes (oil, gas, and water) and injected fluid volumes reported by month and on a cumulative basis. Order 477 for the Schrader Bluff Oil Pool requires the Operator to submit the following for the previous calendar year: • Progress of enhanced recovery project(s) implementation and reservoir management summary. • Voidage balance by month of produced fluids (oil, gas, and water) and injected fluids and cumulative status for each producing interval. • Summary and analysis of reservoir pressure surveys within the pool. Results, and, where appropriate, analysis of production and injection logging surveys, tracer surveys and observation well surveys, and any other special monitoring. ■ Review of well testing and pool production allocation factors over the prior year. • Future development plans, • Review of Annual Plan of Operations and Development. A separate Plan of Development is sent annually by October 1. Order 423 for the Sag River Oil Pool requires the Operator to submit the following for the previous calendar year: • Progress of enhanced recovery project implementation and reservoir management summary including engineering and geotechnical parameters. • Voidage balance by month of produced fluids and injected fluids and cumulative status. • Analysis of reservoir pressure within the pool. • Results, and, where appropriate, analysis of production logging surveys, tracer surveys and observation well surveys. • Review of pool allocation factors over the prior year. • Future development plans. Order 550.007 for All Milne Point Pools requires the Operator to submit the following for the previous calendar year: • A summary of the performance and operational issues relating to the Unit 5 MPFM. • The monthly oil, gas and water allocation factors for each Milne Point Field pool. Each of the three producing reservoirs is reported in a separate section. Section 1 General Information List of Exhibits Milne Point Unit Map Overview Statistical Summary Kuparuk Pressure Map Schrader Bluff Pressure Map Sag River Pressure Map 1-A 1-B 1-C l -D I -E Overview Exhibit 1-A shows the participating areas of the three waterflood projects in the Milne Point Unit: the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool and the Sag River Oil Pool. A miscible water -alternating -gas (MWAG) process was certified as an enhanced oil recovery project for the Milne Point Kuparuk reservoir on September 15, 1998. The MWAG process was in effect from December 2001 to December 2002. Since December 2002, a different enhanced oil recovery method, US -WAG (water -alternating -gas injection in an under -saturated reservoir), has been in effect and will continue to be implemented in the Milne Point Kuparuk reservoir. During 2005, permitting was completed for implementation of a pilot WAG program in the Schrader Bluff. In 2006, the pilot commenced with injection into two E -pad injectors, MPE-29 and MPE- 25A. During 2007 and 2008, both E pad injectors continued WAG injection and WAG injection was discontinued in 2009. In May 2005, injection at L pad was converted from produced water injection to lower salinity Prince Creek source water injection as a means of potentially increasing recovery. Observation of resulting production and salinity trends has indicated a clear chemical, but indistinct production response. Bright WaterTM is a polymer additive to injection water that alters sweep patterns within the reservoir with the purpose of improving oil recovery. A Bright WaterTM trial was pumped in MPB-12i in 2004 and monitoring of this injection pattern continued through 2005-06. The 2004 treatment yielded a positive response. A second Bright WaterTM program was deployed in 2007 in which MPE-23i and MPF -62i were treated. Results from the 2007 program are unclear due to metering issues. In 2009, an injection header Bright Water treatment was pumped at MPC -Pad, in which five wells were simultaneously treated (MPC -02i, 06i, 10i, 15i, 19i). Limited response from the 2009 program was seen in 2010. A drilling campaign was initiated in December 2008, commencing in March 2009, in which two coiled tubing sidetracks (MPB-22A, MPC -43) and one rotary well (MPF -96) were brought online. A second drilling campaign kicked off in December 2009 continuing through March 2010, which included five wells (MPE-14A, MPC -24A, MPL-02A, MPL-36, MPF-82Ai). These new wells came online in 2010, and are included in the 2010 Waterflood Report. Exhibit 1-B provides well count, production, and injection statistics for the Kuparuk River Oil Pool, the Schrader Bluff Oil Pool and the Sag River Oil Pool. During the report period of January through December 2010, field production averaged 26.6 MBOD, 16.0 MMSCFD (GOR 602 SCF/STB) and 71.2 MBWD (water cut 73%). Waterflood injection during this period averaged 95.0 MBWD with 6.4 MMSCFD of gas injection. The overall field voidage replacement ratio was 0.91 RB/RB for 2010. As of December 31, 2010, cumulative water injection in the Kuparuk River Oil Pool was 428.1 MMSTB, while cumulative gas injection was 101.1 BSCF. Cumulative production was 227.1 MMSTB oil, 123.7 BSCF gas, and 253.2 MMSTB water. From first production to December 31, 2010, cumulative production exceeded injection by 5 0. 8 MMRB. As of December 31, 2010, cumulative water injection in the Schrader Bluff Oil Pool was 125.9 MMSTB and cumulative gas injection in the Schrader Bluff Oil Pool was 220 MMSCF. Cumulative production was 64.2 MMSTB oil, 39.1 BSCF gas, and 47.7 MMSTB water. From first production to December 31, 2010, cumulative production has exceeded injection by 29.7 MMRB. Cumulative water injection in the Sag River Oil Pool from startup through December 2010 was 2.4 MMSTB, while cumulative gas injection was 324 MMSCF. Cumulative production was 2.3 MMSTB oil, 2.3 BSCF gas, and 2.0 MMSTB water. As of December 31, 2010, cumulative production exceeded injection by 3.3 MMRB. Exhibits 1-C, 1-D, and 1-E provide an aerial view of reservoir pressures throughout the Kuparuk River, the Schrader Bluff, and the Sag River Oil Pools. by 0 rust, Schrader Bluff Mo PA Exhibit 1-B Milne Point Unit 2010 OVERVIEW STATISTICAL SUMMARY WELL STATISTICS As of 12/31/2009 Producers Injectors - WAG - Water Only - Gas Only As of 12/31/2010 Producers Injectors - WAG - Water Only - Gas Only Production Well Status in 2010 - Newly Drilled - Sidetracked or Redrilled Gas Injection Well Status in 2010 - Newly Drilled - Sidetracked or Redrilled WAG Injection Well Status in 2010 - Newly Drilled - Sidetracked or Redrilled Water Injection Well Status in 2010 - Newly Drilled - Sidetracked or Redrilled Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool 88 54 2 48 43 1 24 0 0 23 43 1 1 0 0 87 50 3 49 43 1 15 0 0 33 43 1 1 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 NOTES: (1) Well count reflects ONLY those wells that were operating at the time of interest. Exhibit 1-B (continued) Milne Point Unit 2010 OVERVIEW STATISTICAL SUMMARY PRODUCTION/INJECTION STATISTICS Cumulative Production Through 1213112010 Oil (MSTB) Gas (MMSCF) Water (MSTB) Cumulative Injection Through 12/31/2010 Water (MSTB) Gas (MMSCF) Cumulative Voidage Balance Through 12/31/2010 Cum. Production (MRB) Cum. Injection (MRB) Over/Under (MRB) AVERAGE RATE 2010 Production: Oil (MBD) Gas (MMSCFD) Water (MBD) Injection: Water (MBD) Gas (MMSCFD) AVERAGE OF PRESSURES OBTAINED IN 2010 (prig) - December 2010 Kuparuk River Oil Pool Schrader Bluff Oil Pool Sag River Oil Pool 227,138 64,156 2,265 123,738 39,147 2,317 253,205 47,679 2,008 428,070 125,920 2,368 101,069 220 324 582,880 157,204 6,027 532,112 127,511 2,689 -50,768 -29,693 -3,338 17.2 8.8 0.62 12.4 2.9 0.79 55.5 15.3 0.42 64.2 29.9 0.95 6.4 0.0 0.00 2,898 1,622 3,172 i�S4 MPL-02A T t 1A f 1 MP -34 25 i 1 , I� M54 3D S99 MPq 2 ! MPF -22 MP -76 MPF -29 2786 3396 1808 M*65 1 1 0 MP 50 MPF -83 19ZS . 1 1376 MpF�s 3289 3175918 �y 2 8 MP653 �._. MPJ. -x5 _ .1 1 2raA H1V2791 Mr �1 hT _... z�s f M2!J1OG 2 MP�!5 5 M315" MP -14 kIPF-01 3 1M4 MPJ -29 MPF -96 2&42 MP 496 MPF -87A 2315 i ♦ 0 3463 t ♦ 2832 MP�-11 2577 MPF -13 VL -05 3438 09 3146 MP -13 MPL 3 1748 l._.� 2 9 2 7 1892 MPJW2aA MI -09 1 ]89] MPJ.05 31 1 4ZI 7 MPL-03 i 3.507 L MPF -M 2658E I 1 1 1 MP# -20 3545 I I MPr-8 A MPL-02A T t 1A f 236 MPk 254• MPL-40 1 1574 MPfr,21 1 M%'.08 26'68 MF MPWo4 2 2 2 6 MP 28A 4"1 MP -12 2 5 M 0 MPC -24A 0 25'62 3091 MPA 3 1 by BP Alaska Exhibit 1-C 0 2010 Kuparuk Formation Pressure Map, Milne Point Unit �._.� Milne Point Unit Boundary Well Status: A Injector Producer Note: 1 _ All pressures were taken in 2010, corrected to the datum tT @ 7000' 7VDss, and are shown in red. Where multiple pressures were recorded in a well, the one with longest shut-in period is used. 1 0 1 2mi MPU5,A MP 'F-16 MPf�•19 3242 MPr 15 L- 1 1 22aa 2ti178 1 MPAi22A MPE45 2' 3 3055 i MP 05 3826 _ MPF,14A i 3 '2 MPE- 1 3635 1 1 1 MPI� 18A 1 � I MP -22 29{]8 1 1 26'18 I 1!EP, MFA -33 2 1 1 1 1 MW -10 I 35'87 f 1 1 f f ----------------------- 1 1 f 1 1 1 by BP Alaska Exhibit 1-C 0 2010 Kuparuk Formation Pressure Map, Milne Point Unit �._.� Milne Point Unit Boundary Well Status: A Injector Producer Note: 1 _ All pressures were taken in 2010, corrected to the datum tT @ 7000' 7VDss, and are shown in red. Where multiple pressures were recorded in a well, the one with longest shut-in period is used. 1 0 1 2mi MPU5,A MP 'F-16 MPf�•19 3242 MPr 15 L- 1 1 22aa 2ti178 1 MPAi22A MPE45 2' 3 3055 i MP 05 3826 _ MPF,14A i 3 '2 MPE- 1 3635 1 1 1 MPI� 18A 1 � I MP -22 29{]8 1 1 26'18 I 1!EP, MFA -33 2 1 1 1 1 MPJ -23 1.0 MPI -12 1.0 MPI -13 1819 MAPF -11 1555 MPJ -18 MPG -15 1909 ! 1543 MPJ -01A MPG -14 1338 'Olt h'G-10 2398 MP OA MPI- 9 MPJ -09A MPI- 9 MPJ -0 5 MPG -08A 2523 1387 MPJ -19A 1231 ; ■ MFJ-02 MPG -04 1373 MPG: AaIMPGAEO 95$ 1693 MPG -16 2.� 103-1 a MPI-10 PI- 4 1294 MPI- 8 MPI -17 2508 1.7 MPI -Amp 2475 1 MPI-00 PI- 7 1305 by BP Alaska Exhibit 1-D 0 Schrader Bluff Formation Pressure Map Milne Point Unit - 2010 Well Name 0 0 Producer Static Pressure A Injector Pressures obtained in 2010 corrected to datum of 4000' Not all wells penetrate all sands, many are only in "N" sands or only in "O" sands. In wells with multiple pressures, the longest Sl time is shown and pressures are averages over all zones API -03 1292 MPG -02 MPH -13A MPJ -04 1.2 1.1 1888 MPE-25A ■ 2656 MPI -10 PI- 5 1671 MPH -1 0 1435 MPS -34 12�a8 MPH -17 2153 MPS -19A MPS -111&7 2238 MPH -0813 1.2 MPS -08 1443 MPE-31 1722 4PE - 0A 1207 MPS -01A 1853 Mr -O-32 MPS -33 )H -07A 1581 MPS 33A 1117 1.9 MPS -13 MPS -24 1288 134*�PS-25 M -23 ,NIPS -05 MPS -03 344 `1055 MPE-32 A I I I MPJ -23 �'—•� 2 97 1 I 1 I 1 1 1 1 1 i i ! _...._._._._._._._--. i by BP Alaska Exhibit 1-E Sag River Formation Pressure Map Milne Point Unit, 2010 Milne Point Unit Boundary Milne Point Sag River PA Note: All pressures were taken in 2010, corrected to the datum @ 8750' TVDss, and are shown in red. Where multiple pressures were recorded in a well, the one with longest shut-in period is used. 1 0 1 2mi NIM F Section 2 Kuparuk River OR Pool List of Exhibits Waterflood Pattern Map 2-A Total Reservoir Production Plot 2-B Total Reservoir Injection Plot 2-C Pertinent Data Summary 2-D Reservoir Voidage Balance 2-E Static Pressure Data 2-F Injection Rate & Pressure Data By Well 2-G Kuparuk River Oil Pool Waterflood Project Summary The Kuparuk River Oil Pool waterflood area is shown in Exhibit 2-A. The locations of producing and injecting wells are shown, as are the interpreted hydraulic units. These hydraulic units represent regions of the reservoir that are believed to be hydraulically isolated due to faulting and/or lithologic controls. There were 87 producing wells and 49 injection wells active through 2010. Exhibit 2-B shows a production plot for the Kuparuk River reservoir covering the entire project history through December 2009. The Kuparuk River Oil Pool oil production averaged 17.2 MSTBD for 2010 compared to 19.5 MSTBD in 2009. This represents an oil production decrease of 11.8% in 2010. Water production averaged 55.5 MBWD in 2010 and 56.9 MBWD in 2009, a decrease of 2.5%. Cumulative production since waterflood startup through the end of 2010 is 227.1 MMSTB of oil, 123.7 BSCF gas, and 253.2 MMSTB of water. Exhibit 2-C shows an injection plot for the Kuparuk River reservoir covering the entire project history through December 2010. Water and gas injection rates averaged 64.2 MBWD and 6.4 MMSCFD for 2010. Injection rates in 2009 averaged 60.9 MBWD and 9.7 MMSCFD. This represents a decrease in water injection of 0.05% and a decrease in gas injection of 34%. Cumulative water injection since waterflood startup through the end of 2010 is 428.1 MMSTB and cumulative gas injection is 10 1. 1 BSCF. Average water cut increased from 74.5% in 2009 to 76.3% in 2010. Water cut continues to increase in the Kuparuk River reservoir as the waterflood patterns mature. Average GOR decreased from 775 SCF/STB in 2009 to 718 SCF/STB in 2010. This GOR decrease is due declining oil rates, resulting in less solution gas produced. Exhibit 2-D presents a summary of the pertinent production information for the Kuparuk River Oil Pool waterflood. Exhibit 2-E shows a monthly breakdown of production and injection data for the report period. This data shows that the voidage replacement ratio averaged 0.85 RB/RB in 2010. The VRR in 2009 averaged 0.79 RB/RB. This represents a increase of 7.60%. The cumulative VRR for the reservoir is 0.921RB/RB. The reservoir voidage calculation does not include the water influx from the aquifer, so the under -injection volume is overstated in this report. Exhibit 2-F presents the reservoir pressure data taken during 2010 for the Kuparuk River wells. In 2010, 96 pressures were obtained in 69 wells, 58 active producers and 10 active injectors and 1 long term shut in well. This equates to gathering pressure data in 67% of active producers and 20% of active injectors. Exhibit 2-G provides a 2010 monthly summary of individual well injection rate and injection pressure data for all of the Kuparuk River Oil Pool injectors. A MPF-34MPF-17 MPF -92 ! • r • 1 • ` • ■ MPF -54 • MPF PA-95N1PF-68A■ MPF -42 2 MPF -38 MPF 41 I M A MPF -21 2` MPF -78A ! I AMPF-29MPF-50 P• MPF -70 MPF-7(�1PF$5 • .r MPF -79 MPF -10 ! MPF-4�k MPF -53 • — • — �• MPF -18 ! PF -57A ■ * MPF�B• '+...� A A MPF-26MPF -OF -62 MPF 6MPL-294P 49 JIPF48�j MPF-jB• ■ t7 A MPC -25 MPF -06 MPF-9IMPF-1APF-2�iuIPF6IMPF-73 MPL-IVPL-21 * MPG43L1 Q I• •1 40MPL-15 MPL-24 MPL-294W-MPC-43L1.01 • 1 MPF -96 MPF-% PFA * • MPL-11 A . r A MPL33• 11PL-0410 MPL-07MPC-19 ` • — MPF -84136 t18 MPL-13 MPL-43 . ■ w . w . i IAPF�3 ! MPL-08 ■ MPL-06 FPC -09 ! • MPC -26A MPC -12A! i MPL-28A • MPL-09 ■ MPC -17 MPC -07 I I MPF -05! MPL-10 A ■ MPC 42 C-04 MF -80 MPL-03 MPC -08 0 A • I ■ A ! A MPC -28A MPC -03 MPC -10 ■ MP78 tl7 MPI} -81 'r •I MPF -M MPF MPL-02AOMPC-36 ! lMPGii ! MPL-01A MPG26,oMPG2[ k • "' r . — . MPTBMPL-40MPB-18 MPL-17 • A -05A MPC -39 MPC -15 P• -0Z ■ w r r 1 MPL 12MPC-14 MPMS .— • ■ + MPC -13 MP 24! MPC -18 A • MPL-39 A MPC -40 MPG -06 MPC -24A �P� � MP$�2''• MPL-4Z p ■ MPL-32 MPC -2Z'_ T c �%P&18MPB-10MP 11 MPS -14 ' I ■ ��APJ-16 MPE-13A I MPI -03 ! MPB-23 /*MPB-03 w� - • MNLIO 1VIPC 22A MP&25 . ! PE -02- ■ Kuparuk Formation Hydraulic Unit Map, Milne Point Field, 2010 Producer suspended Hydraulic Unit Boundary Milne Point Unit Boundary 1 2 mi I MPL 2[i A MPS C}4P MP8 ZQ MPL-34 MPJ -09 MPJ -11 A MPA -034 `MP&07•MMP�17■ ■ •. MPB{i5A •— • • MPJ 13 MPA -Qi • MPB 09 E,75MPCFP-2MP6-16 I • MPE-18 0 ■ • ! • MPJ 12 MPA -02-1 ■MPB•05MPB-15 !`MPB-13 MPE ! 91.E-M26PB 21 MPE-08 I NIPJ 90 MP B9 MPE fl6f MPE-04 • I A ■MPE-AMPS-10— MPE-07 MPE-05 ! • MPE-09♦ • M E-1!— 23 • ! I MPE-14A • • MPK-02 • MPK-f MPE-11 MP E-22 MPK-05 1 I I — • ! + MPK-13 ' I - MPKC • PK-17MPK • 18A MPH -05 ! I MPK APK 38 I �APK-43A ■ I MPK 21A MPK-37 ; MPK30 . ■ MPH -06 . ..—..p .■�.— � 1 300001 P&DIiIIY p m200001 H N N m m f - N150001 0 0 o. a m100001 0� 50001 1 Exhibit 2-13 BP ALASKA - Milne Point Unit Kuparuk Reservoir, Total Production 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 Oil Prod Cum KUP Oil Prod Rate KUP Water Prod Cum KU } Water Prod Rate KUP Gas Prod Cum KUP Gas Prod Rate KUP 10 0 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 1. —a-- Water Cut % KUP — 0 - Producers Online -A' - Gas/Oil Ratio KUP 1000000 100000 Q R 'a V 10000 i LL V N 1000 0 a` N R 100 10 1.0 0.9 0.8 0.7 0.6 0 0.5 a 0 0.4 0.3 0.2 0.1 0.0 2010 production_injection.As 3/16/2011 I111��� 11111; � .,III .. :.rim,III IIlIIIII IN X111 NINE�`i ;'i �� IIIIIIIIIIII 10 0 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 1. —a-- Water Cut % KUP — 0 - Producers Online -A' - Gas/Oil Ratio KUP 1000000 100000 Q R 'a V 10000 i LL V N 1000 0 a` N R 100 10 1.0 0.9 0.8 0.7 0.6 0 0.5 a 0 0.4 0.3 0.2 0.1 0.0 2010 production_injection.As 3/16/2011 1000000 } '.00000 Q O M rn op 10000 H C 0 t5 1000 AL C d Y A 100 Exhibit 2-C BP ALASKA - Milne Point Unit Kuparuk Reservoir, Injection 10000000 1000000 a ao O LL LL N 100000 2 1. LL U U) N � C C 10000 d c 'c - - c M 0 N 1000 10 It - - --- -- - -- -- - .! 100 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 Water Inj Cum KUP Water Inj Rate KUP Gas Inj Cum KUP Gas Inj Rate KUP —Solvent Inj Cum KUP Solvent Inj Rate KUP 50 - - 45 - - -- --i-- --^� 1 40 •-� I I - f 35�.t� - 30 12 0 25 I I Ii c 20 - r— 46 # 15 r , • 10 s� i • 5#—`rte f aim"�... -.. -- .. -- ... 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 Water Injectors OnLine ® Gas Injectors OnLine • MI Injectors OnLine 2010 prod uction_injection.xis 3/18/2011 Exhibit 2-D Milne Point Unit - Kuparuk River Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2010 WATERFLOOD START-UP DATE: November 1985 PRODUCTION Prior to Waterflood Start -Up: Oil (MSTB) 0 Gas (MMSCF) 0 Water (MSTB) 0 Since Waterflood Start -Up: Oil (MSTB) 227,138 Gas (MMSCF) 123,738 Water (MSTB) 253,205 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 428,070 Injection Gas (MMSCF) 101,069 Lean Gas (MMSCF) 92,647 Solvent (MMSCF) 8,422 AVERAGE OF PRESSURES OBTAINED IN 2010 Ca- 7,000' TVD ss December, 2010 Pressure (psig) 2,898 WELL COUNT (Wells in Operation)* Production Wells 87 WAG Injection 15 Water Only Injection 33 Gas Only Injection 1 Notes: * Reflects ONLY operating wells. Exhibit 2-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Kuparuk River Oil Pool January - December 2010 Production: Injection: Oil Water Gas Reservoir Water Gas Voidage Voidage Voldage Month Prod Rate Prod Rate Prod Rate Voidage Inj Rate Inj Rate Replacement Replacement Balance 12/31/2009 (stb/day) (stb/day) (mscf/day) (rbbVday) (stb/day) (mscf/day) (rbbVday) Ratio (rbbVday) 1/31/2010 16467 53509 11783 80,652 65401 5554 71,741 089 -8,906 2/26/2010 16697 50746 11768 78,043 58084 6018 64,768 083 -13,275 3/31/2010 18199 53988 12131 83,050 59563 5517 65.785 079 -17,265 4/30/2010 18426 53057 12396 82,565 68733 6820 76.351 0 92 -6,214 5/31/2010 15473 52011 11144 77,613 66790 5044 72,664 094 -4,949 6/30/2010 13456 45759 9641 67,983 49063 4610 54,252 080 -13,732 7/31/2010 17012 53678 11386 80,937 61167 5975 67,855 0 84 -13,082 8/31/2010 18686 60780 13103 91.325 66208 7102 74,060 081 -17,265 9/30/2010 19175 62379 13334 93,614 68282 7486 76.537 0 82 -17,077 10/31/2010 17800 58138 12673 87.423 63056 6511 70.290 0 80 -17,133 11/30/2010 18004 60955 14391 92,126 71698 8270 80,761 0 88 -11,366 12/31/2010 17174 60876 14582 91,477 71980 7930 80,719 0 88 -10,758 .Average: 2010 17,214 55,490 12,361 83,901 64,169 6,403 71,316 085 -12,585 Cumulative: moth mob mmscf mrb. mall/ mmscf mrb mru 31-❑ec-10 227.138 253,205 123,738 982,880 428,070 101,069 532.112 0 91 -50,768 Page I Exhibit 2-F Static Pre Data Kuparuk R' 'il Pool STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RESERVOIR PRESSURE REPORT 1 Operator: BPXA 12 Address: 900 E Benson Blvd Anchorage, Alaska 99508-4254 3 Unit or Lease Name: Milne Point 14 Field and Pool: Kuparuk River Pool 5 Datum Reference: 7000' SS Oil Gravit API - 23 7 Gas Gravity: Air = 1 0 8 Well Name and Number: 9 API Number 50-XXX-XXXXX-XX-XX 10 Oil (0) or Gas (G) 11 AOGCC Pool Code 12 Final Test Date 13. Shut -In Time, Hours 14 Press Surv. Type (see instructions for codes) 15 B H. Temp 16. Depth Tool TVDss 17 Final Pressure at Tool Depth 18 Datum TVDss (input) 19 Pressure Gradient, psi/ft 20. Pressure at Datum (cal) Comments Zone MPB-03 50-500-29207-32-00 PROD 525100 9/7/2010 9/7/2010 SBHP 174 16,874.83 2.619 7.000 0.386 2.667.33 C MPB-05A 50-500-29207-72-01 INJ 525100 3/14/2010 3/14/2010 SBHP 118 7,044.79 5.075 7.000 0.421 5.056.15 C MPC -04 50-500-29208-01-00 PROD 525100 10/28/2010 10/28/2010 FBHP 7,048.63 2,270 7,000 0.823 2.230 B + C MPC -04 50-500-29208-01-00 PROD 525100 7/10/2010 7/10/2010 SBHP 7,048.63 2.526 7.000 0.823 2.486 B+C MPL-01A 50-500-29210-68-01 PROD 525100 8/19/2010 8/19/2010 SBHP 146 6,148.08 3,923 7,000 0.400 4,263.77 A2+A3 MPC -07 50-500-29212-66-00 PROD 525104 4/14%2010 4/14%ZUiO SBHP 6,901.62 2,410 7,000 0.427 2,452 A2+A3 MPB-15 50-500-29213-74-00 PROD 525100 9/7/2010 9/7/2010 SBHP 1113 6,930.10 2,277 17,000 0295 2,297.62 B+C MPB-22A 50-500-29215-09-02 PROD 525100 2/3/2010 21312010 SBHP 170 6.642.49 2.601 7.000 0.453 2,763.13 B MPL-03 50-500-29219-99-00 PROD 525100 3/5/2010 3/5/2010 SBHP 172 6,800.26 3,437 7,000 0.349 3,506.71 Al+A2+A3+B MPL-03 50-500-29219-99-00 PROD 525100 6/25/2010 6/25/2010 PP 181 6.791.73 2.915 7,000 0.409 3,000-28 Al+A2+A3+B MPL-06 50-500-29220-03-00 PROD 525100 6/25/2010 6/25/2010 PP 182 6.872.37 2,616 7,000 0.411 2,668.48 Al+A2+A3+B+C MPL-05 50-500-29220-30-00 PROD 525100 6/25/2010 6/25/2010 PP 185 7,046.23 1,767 7,000 0.408 1,748.14 Al+A2+A3+B+C MPE-05 50-500-29220-58-00 INJ 525100 1/30/2010 1/30/2010 PFO 1 7,000 0.547 3,826 C MPL-09 50-500-29220-75-00 INJ 525100 10/10/2010 10/10/2010 SBHP 139 7.000.35 3.704 7.000 0.000 3.704 Al+A2+A3+B+C MPE-06 50-500-29221-54-00 PROD 525100 3/18/2010 3/18/2010 PBU 1 2,851 7,000 0.415 2,903 1 B+C MPE-06 50-500-29221-54-00 PROD 525100 5/6/2010 5/6/2010 SBHP 177 6,767.17 2,972 7.000 0.359 3.055.67 B+C MPE-08 50-500-29221-56-00 PROD 525100 4/15/2010 4/15/2010 SBHP 165 6,674.47 2,546 7,000 0.385 2,671.38 C MPL-12 50-500-29223-34-00 PROD 525100 6/25/2010 6%25/2010 PP 175 6,854.77 2,320 7.000 0.409 2,379.45 Al+A2+A3+B MPL-12 50-500-29223-34-00 PROD 525100 4/22/2010 4/22/2010 SBHP 177 6,704.45 2,721 7.000 U.183 2,775 B+A3+A2+A1 MPL-12 50-500-29223-34-00 PROD 5Z5luu 5/17/2010 5117/2010 PP 1%/ b.854.%/ Z.1597 7.000 U.441 2,9b1 B+A3+A2+A1 MPL-13 50-500-29223-35-00 PROD 525100 6/25/2010 6/25/2010 PP 176 6,897.49 2,395 17,000 0.412 2,437.23 Al+A2+A3+B+C MPL-11 50-500-29223-36-00 PROD 525100 6/25/2010 6/25/2010 PP 182 6.959.50 3.045 7.000 0.162 3.038.44 Al+A2+A3+B+C MPL-14 50-500-29224-79-00 PROD 525100 6/25/2010 6/25/2010 PP 177 6,938.02 1,839 7,000 0.410 1,864.42 Al+A2+A3+B+C MPC -21 50-500-29224-86-00 PROD 525100 7/14/2010 7/14/2010 FBHP 7.004.06 988 7.000 4.926 968 A + B + C MPC -21 50-500-29224-86-00 PROD 525100 7/10/2010 7/10/2010 SBHP 7.004.06 1,186 7.1000 4.926 1.166 A+B+C MPC -22A 50-500-29224-89-01 PROD 525100 8/12/2010 8/12/2010 SBHP 145 5.682.85 2,807 7.000 0.324 3,234.20 A2+A3 MPJ -10 50-500-29225-00-00 PROD 525100 3/12/2010 3112/2010 SBHP 170 6.657.13 13,432 7.000 0.439 3.582.43 A2+A3+C MPJ -10 50-500-29225-00-00 PROD 525104 4/16/2010 4/16/2010 SBHP 168 6,658.99 3,471 7,000 0.367 13,596 A2+A3+C MPJ_10 50-500-29225-00-00 PROD 525100 5/13/2010 5/13/2010 LSBHP 6.773.80 3.459 7.000 0.566 13.587 A2+A3+C MPE-11 50-500-29225-41-00 PROD 525100 5/8/2010 5/8/2010 SBHP 168 6.588.48 3,485 7.000 0.366 3.635.44 1 C MPL-29 50-500-29225-43-00 PROD 525100 6/25/2010 6/25/2010 PP 186 7.076.71 2.347 7,000 0.412 2,315.43 Al+A2+A3+B+C MPF -25 50-500-29225-46-00 PROD 525100 6/26/2010 6/26/2010 SBHP 187 6,986.32 3,034 7.000 0.392 3.039.36 Al+A2+A3 MPF -25 50-500-29225-46-00 PROD 525100 7/16/2010 7/16/2010 SBHP 185 7,078.05 3,226 7,000 4.410 3,194 Al+A2+A3 MPF -37 50-500-29225-48-00 PROD 525100 6125/2010 6/25/2010 PP 179 7,139.09 1,740 7,000 0.522 1,667.43 Al+A2+A3 MPF -13 50-500-29225-49-00 INJ 525100 6/25/2010 6/25/2010 PP 178 7.011.29 3,083 7.000 0.399 3,078.49 Al+A2+A3 MPF -13 50-500-29225-49-00 INJ 525100 9/14/2010 9/14/2010 ISBHP 183 6,955.28 3.127 7,000 0.366 3,146.39 Al+A2+A3 MPF -01 50-500-29225-52-00 PROD 525100 6/25/2010 6/25/2010 PP 172 6,751.36 2.540 7.000 0.424 12,642.09 Al+A2+A3 MPF -45 50-500-29225-56-00 PROD 525100 6/25/2010 6/25/2010 PP 177 6.963.04 1,993 7,000 0.410 12.008.17 Al+A2+A3 MPF -53 50-500-29225-78-00 PROD 525100 6/25/2010 6/25%2010 PP 176 6,881.61 2.743 7.000 0.362 12.791,38 Al+A2+A3+C MPF -61 50-500-29225-82-00 PROD 525100 1/18/2010 1/18/2010 SBHP 180 6,863.81 12,2156 7.000 0.419 2.314.97 Al+A2+A3+B MPF -61 50-500-29225-82-00 PROD 525100 6/25/2010 6/25/2010 PP 180 6,912.90 i 1,793 7,000 0-406 1.828.67 Al+A2+A3+B MPF -69 50-500-29225-86-00 PROD 525100 6/17/2010 6/17/2010 PP 1183 6,996.89 3,064 7.000 0.386 10.410 3.065.23 Al+A2+A3+g MPF -78 50-500-29225-99-00 JPROD 525100 6/25%2010 6/25/2010 IPP 1186 7.170.59 3.466 7.000 0.421 3,395.89 Al+A2+A3+C MPL-25 50-500-29226-21-00 IPROD 525100 6/25/2010 6/25/2010 IPP 1179 7,137.07 3,694 7,000 OA10 3.637.83 Al+A2+A3+B MPF -22 50-500-29226-32-00 LPROD 525100 6%25/2010 6/25/2010 IPP 1166 6.638.25 2.638 7.000 2,786.42 A1+A2 Exhibit 2-F Static Pre Data Kuparuk R' 11 Pool 8 Well Name and Number: 9. API Number 50-XXX-XXXXX-XX-XX 10 Oil (0) or Gas (G) 11 AOGCC Pool Code 12 Final Test Date 13. Shut -In Time, Hours 14 Press Sury Type (see instructions for codes) 15 BH Temp 16 Depth Tool TVDss 17 Final Pressure at Tool Depth 18. Datum TVDss (input) 19 Pressure Gradient, psi/ft. 20 Pressure at Datum (cal) Comments Zone MPC -26 50-500-29226-34-00 PROD 525100 6/17/2010 6/17/2010 FBHP 6.465.54 950 7,000 0.366 760 A + B + C MPF -06 50-500-29226-39-00 PROD 525100 6/25/2010 6/25/2010 IPP 174 6,883,28 2,713 7,000 10.408 2,760.97 Al+A2+A3 MPC -28A 50-500-29226-48-01 INJ 525100 2/25/2010 2/25/2010 SBHP 144 7.000.04 4.111 7.000 0.500 4,110.98 A2+A3+C MPF -18 50-500-2922&-81-00 PROD 525100 6/25/2010 6/25/2010 PP 184 7,002.82 2,755 7,000 0.401 2,753.77 A1+A2+A3 MPE-16 50-500-29226-86-00 INJ 525100 2/17/2010 2/17/2010 PFO 7.000 0.463 3,242 B+C MPF -29 50-500-29226-88-00 PROD 525100 2/7/2010 2/7/2010 SBHP 93 4.220.65 907 7,000 0-324 1,808.36 A1+A2+A3 MPF -29 50-500-29226-88-00 PROD 525100 6/25/2010 6/25/2010 PP 182 7,064.20 1.751 7.000 0.409 1.724.76 Al+A2+A3 MPF -66A 50-500-29226-97-01 PROD 525100 6/25/2010 6/25/2010 PP 187 7.255.19 11.775 7,000 0.380 1,678.10 Al+A2+A3 MPK-30 50-500-29227-11-00 PROD 525100 8/5/2010 81512010 SBHP 1161 6,857.20 2,879 17,000 0.365 2,931.15 B+C MPK-21A 50-500-29227-18-01 INJ 525100 11/11/2010 11/11/2010 SBHP 163 6.999.96 2,692 7.000 0.37 2,692.02 C MPF -54 50-500-29227-26-00 PROD 525100 6/25/2010 6/25/2010 PP 180 7,093.90 2,833 7,000 0.37 2,794.46 Al+A2+A3 MPK-33 50-500-29227-29-00 PROD 525100 8/6/2010 8/6/2010 SBHP 162 6,810.70 1,707 7,000 0.37 1,779.54 B+C MPK-33 50-500-29227-29-00 PROD 525100 8/7/2010 8(1/2010 SBHP 162 6.810.70 1,707 7.000 0.383 1,779.54 SAG MPK-33 50-500-29227-29-00 PROD 525100 10/7/2010 10/7/2010 FBHP 222 8.249.05 2,673 7,000 0.366 2,893 SAG MPK-18A 50-500-29227-33-01 INJ 525100 10/14/2010 10/14/2010 SBHP 151 6.999.73 2,808 17,000 0.444 2,808.12 B+C MPE-14A 50-500-29227-34-01 PROD 525100 1/12/2010 1/12/2010 PBU 1 2,962 7,000 0.443 3,102 B MPE-19 50-500-29227-46-00 PROD 525100 8/25/2010 8/25/2010 SBHP 185 6,759.67 1,402 7.000 0.113 1,429.19 B+C MPF -65 50-500-29227-52-00 PROD 525100 6/25/2010 6/25/2010 PP 188 7.318.73 1.902 7.000 0.409 1,771.62 A1+A2+A3 MPF -65 50-500-29227-52-00 PROD 525100 10/1/2010 10/1/2010 SBHP 175 6,019.17 1,601 7,000 0.42 1,924.90 Al+A2+A3 MPF -50 50-500-29227-56-00 PROD 525100 6/29/2010 6/29/2010 SBHP 201 6,977.99 1,368 7.000 0.42 1,376.02 Al+A2+A3 MPF -50 50-500-29227-56-00 PROD 525100 7/25/2010 7/25/2010 PP 178 7,024.80 11,535 7,000 0.403 1,524 A1+A2+A3 MPF -05 50-500-29227-62-00 PROD 525100 6/25/2010 6/25/2010 PP 171 6,822.48 4,144 7.000 0.399 4.216.98 Al+A2+A3 MPF -09 50-500-29227-73-00 PROD 525100 6/25/2010 6/25/2010 PP 168 6,861.21 2,112 7,000 0.411 2.168.99 Al+A2+A3 MPL-20 50-500-29227-90-00 PROD 525100 5/21/2010 5/21/2010 SBHP 89 3,673.39 2,169 7,000 0.4 3.545 A3+A2 MPL-20 50-500-29227-90-00 PROD 525100 6125120106/25/20110 PP 173 6,160.60 3,563 7,000 0.520 3,999.80 A2+A3 MPL-36 50-500-29227-94-00 PROD 525100 3/11/2010 3/11/2010 PP 144 3,218.68 2,623 7,000 0.129 3,112 A3+A2 MPL-36 50-50-0-29227-94-00 PROD 525100 6/25/2010 6/25/2010 PP 153 5.9U3.85 2.180 7.000 0.410 2,629.36 A2+A3 MPF -79 50-500-29228-13-00 PROD 525100 6/25/2010 6/25/2010 PP 163 6,268.30 2,875 7.000 0.410 3.175.12 Al MPF -34 50-500-29228-24-00 PROD 5251UU 1/7/2010 1/7/2010 SBHP 197 7,383.57 2,427 7,000 0.423 2,264.62 A3+B+C MPF -34 50-500-29228-24-00 PROD 525100 6/25/2010 6/25/2010 PP 197 7.491.05 2.190 7,000 0.380 2,003.42 A3+B+C MPL-40 50-500-29228-55-00 PROD 525100 6/25/2010 6/25/2010 PP 177 6.922.08 1.542 7.000 0.410 1,573.98 Al+A2+A3+C MPC -40 50-500-29228-71-U0 PROD 525100 5/31/2010 5/31/2010 SBHP 6,615.98 2,496 7,000 0.432 2.662 A3+B+C MPF -81 50-500-29229-59-00 PROD 525100 6/25/2010 6/25/2010 PP 159 6,491.20 2,449 7.000 0.410 2.657.69 A1+A2+A3 MPF -82A 50-500-29229-71-01 INJ 525100 3/25%2010 3/25/2010 SBHP 163 6,913.54 21196 7,000 0.339 2,225.31 A1+A2+A3 MPF -86 50-500-29230-18-00 PROD 525100 6/25/2010 6/25/2010 PP 177 6.852.97 2,763 7,000 0.410 12.823,27 A2 MPF -86 50-500-29230-18-00 PROD 525100 12/16/2010 12/16/2010 SBHP 174 6.790.34 3,373 7,000 0.429 3,463 A2 MPC -24A 50-500-29230-20-01 PROD 525100 1/13/2010 1/13/2010 SBHP 153 6,352.19 2.777 7.000 0.484 3.090.75 A2+A3+B+C MPF -94 50-500-29230-40-00 PROD 525100 12/31/2009 12/31/2009 PP 7.282.21 3.673 7.000 0.418 3.555 Al+A2+A3 MPF -94 50-500-29230-40-00 PROD 525100 1/20/2010 1/20/2010 SBHP 181 7,229.23 3,697 7,000 0,441 3.595.84 Al+A2+A3 MPF -94 50-500-29230-40-00 PROD 525100 6/25/2010 6/25/2010 IPP 178 7,299.60 3,099 7,000 0.411 2.976 A1+A2+A3 MPF -94 50-500-29230-40-00 PROD 525100 12/17%20110 12/17/2010 SBHP 171 7.241.72 3,691 17,000 0.385 3,598 Al+A2+A3 MPF -87A 50-500-29231-84-01 PROD 525100 6/25/2010 6/25/2010 PP 1179 7.010.50 2.837 7,000 0.430 2,832.49 Al+A2+A3 MPL-43 50-500-29231-90-00 PROD 525100 3/9/2010 3/9/2010 PP 172 4,769.13 1.739 7,000 0.069 1,892 A+B+C MPL-43 50-500-29231-90-00 PROD 525100 6/25/2010 6/25/2010 PP 170 6.546.68 1.483 7.000 0.410 1.668.73 Al+A2+A3+B+C MPK-22 50-500-29232-49-00 INJ 525100 11/11/2010 11/11/2010 SBHP 165 7,000.12 2.618 7.000 0.417 2.617.95 C MPF -93 50-500-29232-66-00 PROD 525100 6/26/2010 6/26/2010 SBHP 149 5,717.06 3,161 7,000 0.100 3.289.23 Al+A2+A3 MPF -96 50-500-29234-06-00 PROD 525100 1/6/2010 1/6/2010 SBHP 150 6,246.59 2,306 7,000 0.360 2,577.18 Al+A2+A3 MPF -96 50-500-29234-06-00 PROD 525100 6/251-2010 612512010 PP 159 6.366.44 1,760 7,000 0.410 2,019.94 Al+A2+A3 MPF -96 50-500-29234-06-00 PROD 525100 12116/2010 12/16/2010 SBHP 167 6.266.32 1.920 7,000 0.376 2,196 A11+A2+A3 MPL-02A 50-500-29219-98-01 PROD 525100 3/7/2010 3/7/2010 PP 172 6.338.21 2,277 7,000 0.136 2,367 A3+A2 MPL-02A 50-500-29219-98-01 PROD 525100 6/25/2010 6/25/2010 PP 167 5,740.26 1.437 7.000 0.410 1.543.60 Al+A2+A3+B Average 2,687 21 All tests reported herein were made m accordance with the appkcable runs. regulations and instructions of the Alaska Oil and Gas ConMation Commission. I hBreby certffy that the foregoing is true and correct to the best of my knowledge Exhibit 2-F Static Prr � Data Kuparuk R ail Pool 8. Well Name and 9 API Number 10 Qd (0) or 11 ACGCC POW 12, Fitts Test 1 13 Shut -In 14. Press. 15 a H. 16 Depfh ToW 17 Final 18 Datum 19. Pressure 20. Comments Zane Number 50-xxx-XXXXX-xx-1U( Gas (G) Cade Date Time, Hours Sury Type Temp, TVDss Pressure at TVDas Gradient, psA Pressure at [see Tool Depth (input) Datum (cal) InstrucWrIs for codes] Signawre fIt!c Pnraed Name Date FL Fluid Level PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP ihut In Bottom Hole Pressure Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPB-05A 1/1/2010 2,356.20 30 H2O 7,435 247.83333 MPB-05A 2/1/2010 2,426.50 27 H2O 6,052 224.15 MPB-05A 3/1/2010 2,331.80 12 H2O 1,464 122.00 MPB-05A 4/1/2010 2,169.30 30 H2O 49,099 1,636.63 MPB-05A 5/1/2010 1,992.20 31 H2O 59,953 1,933.97 MPB-05A 6/1/2010 1,908.10 27 H2O 50,161 1,857.81 MPB-05A 7/1/2010 1,704.10 31 H2O 42,224 1,362.06 MPB-05A 8/1/2010 1,853.60 31 H2O 53,963 1,740.74 MPB-05A 9/1/2010 1,929.10 30 H2O 60,573 2,019.10 MPB-05A 10/1/2010 1,920.90 31 H2O 59,521 1,920.03 MPB-05A 11/1/2010 2,129.40 30 H2O 61,463 2,048.77 MPB-05A 12/1/2010 2,150.80 31 H2O 63,949 2,062.87 MPB-08 1/1/2010 0 H2O 0 MPB-08 2/1/2010 0 H2O 0 MPB-08 3/1/2010 0 H2O 0 MPB-08 4/1/2010 0 H2O 0 MPB-08 5/1/2010 0 H2O 0 MPB-08 6/1/2010 0 H2O 0 MPB-08 7/1/2010 0 H2O 0 MPB-08 8/1/2010 0 H2O 0 MPB-08 9/1/2010 0 H2O 0 MPB-08 10/1/2010 0 H2O 0 MPB-08 11/1/2010 0 H2O 0 MPB-08 12/1/2010 0 H2O 0 MPB-11 1/1/2010 0 H2O 0 MPB-11 2/1/2010 0 H2O 0 MPB-11 3/1/2010 0 H2O 0 MPB-11 4/1/2010 0 H2O 0 MPB-11 5/1/2010 0 H2O 0 MPB-11 6/1/2010 0 H2O 0 MPB-11 7/1/2010 0 H2O 0 MPB-11 8/1/2010 0 H2O 0 MPB-11 9/1/2010 0 H2O 0 MPB-11 10/1/2010 0 H2O 0 MPB-11 11/1/2010 0 H2O 0 MPB-11 12/1/2010 0 H2O 0 MPB-12 1/1/2010 2,407.40 31 H2O 64,147 2,069.26 MPB-12 2/1/2010 2,403.30 28 H2O 49,804 1,778.71 MPB-12 3/1/2010 2,409.10 31 H2O 54,642 1,762.65 MPB-12 4/1/2010 2,470.70 30 H2O 56,085 1,869.50 MPB-12 5/1/2010 2,486.50 31 H2O 60,688 1,957.68 MPB-12 6/1/2010 2,381.10 25 H2O 45,006 1,800.24 MPB-12 7/1/2010 2,303.30 31 H2O 51,339 1,656.10 MPB-12 8/1/2010 2,376.10 31 H2O 55,381 1,786.48 MPB-12 9/1/2010 2,459.60 30 H2O 57,136 1,904.53 MPB-12 10/1/2010 2,455.90 31 H2O 57,093 1,841.71\ Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Sw Name Month MPB-12 11/1/2010 MPB-12 12/1/2010 MPB-14 1/1/2010 MPB-14 2/1/2010 MPB-14 3/1/2010 MPB-14 4/1/2010 MPB-14 5/1/2010 MPB-14 6/1/2010 MPB-14 7/1/2010 MPB-14 8/1/2010 MPB-14 9/1/2010 MPB-14 10/1/2010 MPB-14 11/1/2010 MPB-14 12/1/2010 MPB-17 1/1/2010 MPB-17 2/1/2010 MPB-17 3/1/2010 MPB-17 4/1/2010 MPB-17 5/1/2010 MPB-17 6/1/2010 MPB-17 7/1/2010 MPB-17 8/1/2010 MPB-17 9/1/2010 MPB-17 10/1/2010 MPB-17 11/1/2010 MPB-17 12/1/2010 MPB-18 1/1/2010 MPB-18 2/1/2010 MPB-18 3/1/2010 MPB-18 4/1/2010 MPB-18 5/1/2010 MPB-18 6/1/2010 MPB-18 7/1/2010 MPB-18 8/1/2010 MPB-18 9/1/2010 MPB-18 10/1/2010 MPB-18 11/1/2010 MPB-18 12/1/2010 MPB-25 1/1/2010 MPB-25 2/1/2010 MPB-25 3/1/2010 MPB-25 4/1/2010 MPB-25 5/1/2010 MPB-25 6/1/2010 MPB-25 7/1/2010 MPB-25 8/1/2010 Wellhead Pres Days Avg (psi) Operating Product Code 2,552.20 30 H2O 2,445.70 31 H2O 2,409.50 31 H2O 2,405.30 28 H2O 2,410.50 31 H2O 2,471.10 30 H2O 2,376.60 31 H2O 2,411.40 26 H2O 2,271.60 31 H2O 2,353.40 31 H2O 2,459.80 30 H2O 2,451.10 31 H2O 2,554.90 30 H2O 2,586.50 31 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 2,411.30 31 H2O 2,407.00 28 H2O 2,414.30 31 H2O 2,475.60 30 H2O 2,420.90 29 H2O 2,388.10 26 H2O 2,334.10 31 H2O 2,401.40 31 H2O 2,461.50 30 H2O 2,536 31 H2O 2,554.00 30 H2O 2,586.20 31 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O Inj Vol Alloc (BBL, MCF) 57,709 53,401 81,732 69,736 75,895 77,903 72,673 62,242 62,050 65,854 72,331 77,038 81,371 84,153 0 0 0 0 0 0 0 0 0 0 0 0 44,498 36,118 37,867 41,349 40,868 34,854 37,112 37,242 44,856 46,601 43,840 47,189 0 0 0 0 0 0 0 0 Injection Rate (BBL, MCF) 1,923.63 1,722.61 2,636.52 2,490.57 2,448.23 2,596.77 2,344.29 2,393.92 2,001.61 2,124.32 2,411.03 2,485.10 2,712.37 2,714.61 1,435.42 1,289.93 1,221.52 1,378.30 1,409.24 1,340.54 1,197.16 1,201.35 1,495.20 1,503.26 1,461.33 1,522.23 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPB-25 9/1/2010 0 H2O 0 MPB-25 10/1/2010 0 H2O 0 MPB-25 11/1/2010 0 H2O 0 MPB-25 12/1/2010 0 H2O 0 MPC -02 1/1/2010 1,517.30 31 H2O 24,556 792.13 MPC -02 2/1/2010 1,554.80 28 H2O 18,356 655.57 MPC -02 3/1/2010 1,596.40 25 H2O 16,310 652.40 MPC -02 4/1/2010 1,674.70 30 H2O 24,033 801.10 MPC -02 5/1/2010 1,606.90 31 H2O 23,547 759.58065 MPC -02 6/1/2010 1,765.00 25 H2O 23,685 947.4 MPC -02 7/1/2010 3,578.80 10 GAS 9,646 964.60 MPC -02 7/1/2010 1,730.70 22 H2O 16,883 767.41 MPC -02 8/1/2010 3,642.20 31 GAS 44,212 1,426.19 MPC -02 9/1/2010 2,063.10 18 H2O 24,143 1,341.28 MPC -02 9/1/2010 3,184.60 10 GAS 13,489 1,348.90 MPC -02 10/1/2010 2,054 31 H2O 32,285 1,041.45 MPC -02 11/1/2010 2,091.50 30 H2O 33,811 1,127.03 MPC -02 12/1/2010 2,089.50 31 H2O 37,214 1,200.45 MPC -06 1/1/2010 2,266.10 31 H2O 41,049 1,324.16 MPC -06 2/1/2010 2,323.10 28 H2O 31,500 1,125.00 MPC -06 3/1/2010 2,342.00 31 H2O 32,630 1,052.58 MPC -06 4/1/2010 2,384.00 30 H2O 34,819 1,160.63 MPC -06 5/1/2010 2,362.90 31 H2O 37,714 1,216.58 MPC -06 6/1/2010 2,241.90 29 H2O 33,444 1,153.24 MPC -06 7/1/2010 2,304.50 31 H2O 35,944 1,159.48 MPC -06 8/1/2010 2,344.60 31 H2O 35,479 1,144.48 MPC -06 9/1/2010 2,457.30 30 H2O 44,213 1,473.77 MPC -06 10/1/2010 2,424.00 31 H2O 42,107 1,358.29 MPC -06 11/1/2010 2,461.20 30 H2O 41,551 1,385.03 MPC -06 12/1/2010 2,471.10 31 H2O 45,874 1,479.81 MPC -08 1/1/2010 2,408.30 31 H2O 5,191 167.45 MPC -08 2/1/2010 2,449.20 27 H2O 4,193 155.30 MPC -08 3/1/2010 4,068.80 23 GAS 11,968 520 MPC -08 3/1/2010 2,461.10 8 H2O 1,442 180.25 MPC -08 4/1/2010 3,973.40 30 GAS 19,790 659.67 MPC -08 5/1/2010 3,912.50 31 GAS 18,064 582.71 MPC -08 6/1/2010 3,797 21 GAS 24,161 1,150.52 MPC -08 7/1/2010 3,854.40 30 GAS 39,710 1,323.67 MPC -08 8/1/2010 4,099.20 31 GAS 47,760 1,540.65 MPC -08 9/1/2010 4,191.70 30 GAS 57,099 1,903.30 MPC -08 10/1/2010 4,043 30 GAS 47,244 1,574.80 MPC -08 11/1/2010 4,054.80 27 GAS 47,639 1,764.41 MPC -08 12/1/2010 4,010.50 31 GAS 44,341 1,430.35 MPC -10 1/1/2010 2,239.10 31 H2O 25,507 822.81 MPC -10 2/1/2010 2,386.30 28 H2O 30,386 1,085.21 MPC -10 3/1/2010 2,291.90 31 H2O 24,354 785.61 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPC -10 4/1/2010 2,310.70 30 H2O 26,449 881.63 MPC -10 5/1/2010 2,300.30 31 H2O 30,202 974.26 MPC -10 6/1/2010 2,183.10 24 H2O 26,406 1,100.25 MPC -10 7/1/2010 2,266.30 31 H2O 33,750 1,088.71 MPC -10 8/1/2010 2,283.20 17 H2O 13,587 799.24 MPC -10 9/1/2010 4,092.30 21 GAS 16,542 787.71 MPC -10 10/1/2010 4,166.90 30 GAS 25,429 847.63 MPC -10 11/1/2010 4,235.10 26 GAS 27,996 1,076.77 MPC -10 12/1/2010 4,133.00 31 GAS 28,505 919.52 MPC -11 1/1/2010 0 H2O 0 MPC -11 2/1/2010 0 H2O 0 MPC -11 3/1/2010 0 H2O 0 MPC -11 4/1/2010 0 H2O 0 MPC -11 5/1/2010 0 H2O 0 MPC -11 6/1/2010 0 H2O 0 MPC -11 7/1/2010 0 H2O 0 MPC -11 8/1/2010 0 H2O 0 MPC -11 9/1/2010 0 H2O 0 MPC -11 10/1/2010 0 H2O 0 MPC -11 11/1/2010 0 H2O 0 MPC -11 12/1/2010 0 H2O 0 MPC -12A 1/1/2010 0 GAS 0 MPC -12A 2/1/2010 0 GAS 0 MPC -12A 3/1/2010 0 GAS 0 MPC -12A 4/1/2010 0 GAS 0 MPC -12A 5/1/2010 0 GAS 0 MPC -12A 6/1/2010 0 GAS 0 MPC -12A 7/1/2010 0 GAS 0 MPC -12A 8/1/2010 0 GAS 0 MPC -12A 9/1/2010 0 GAS 0 MPC -12A 10/1/2010 0 GAS 0 MPC -12A 11/1/2010 0 GAS 0 MPC -12A 12/1/2010 0 GAS 0 MPC -15 1/1/2010 2,796.40 31 H2O 88,180 2,844.52 MPC -15 2/1/2010 2,582.10 28 H2O 44,520 1,590.00 MPC -15 3/1/2010 2,472.20 31 H2O 37,553 1,211.39 MPC -15 4/1/2010 2,492.50 30 H2O 47,956 1,598.53 MPC -15 5/1/2010 2,397.70 31 H2O 40,519 1,307.06 MPC -15 6/1/2010 2,275 25 H2O 34,798 1,391.92 MPC -15 7/1/2010 2,298.90 31 H2O 45,086 1,454.39 MPC -15 8/1/2010 2,145.50 31 H2O 24,457 788.94 MPC -15 9/1/2010 2,296.50 30 H2O 31,047 1,034.90 MPC -15 10/1/2010 2,262.00 31 H2O 31,618 1,020 MPC -15 11/1/2010 2,318.70 30 H2O 35,223 1,174.10 MPC -15 12/1/2010 2,448 31 H2O 44,542 1,436.84 MPC -17 1/1/2010 0 GAS 0 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPC -17 2/1/2010 0 GAS 0 MPC -17 3/1/2010 0 GAS 0 MPC -17 4/1/2010 0 GAS 0 MPC -17 5/1/2010 0 GAS 0 MPC -17 6/1/2010 0 GAS 0 MPC -17 7/1/2010 0 GAS 0 MPC -17 8/1/2010 0 GAS 0 MPC -17 9/1/2010 0 GAS 0 MPC -17 10/1/2010 0 GAS 0 MPC -17 11/1/2010 0 GAS 0 MPC -17 12/1/2010 0 GAS 0 MPC -19 1/1/2010 1,978.20 31 H2O 44,238 1,427.03 MPC -19 2/1/2010 1,974.70 28 H2O 37,024 1,322.29 MPC -19 3/1/2010 2,010.60 31 H2O 51,031 1,646.16 MPC -19 4/1/2010 1,920 30 H2O 39,575 1,319.17 MPC -19 5/1/2010 1,817.20 31 H2O 33,342 1,075.55 MPC -19 6/1/2010 1,678.50 28 H2O 25,099 896.39286 MPC -19 7/1/2010 1,715.10 30 H2O 28,378 945.93333 MPC -19 8/1/2010 1,806.40 31 H2O 32,387 1,044.74 MPC -19 9/1/2010 1,889 30 H2O 38,116 1,270.53 MPC -19 10/1/2010 1,806.40 31 H2O 37,882 1,222 MPC -19 11/1/2010 1,833.90 30 H2O 42,179 1,405.97 MPC -19 12/1/2010 1,680.20 31 H2O 32,087 1,035.06 MPC -25A 1/1/2010 0 GAS 0 MPC -25A 2/1/2010 0 GAS 0 MPC -25A 3/1/2010 0 GAS 0 MPC -25A 4/1/2010 0 GAS 0 MPC -25A 5/1/2010 0 GAS 0 MPC -25A 6/1/2010 0 GAS 0 MPC -25A 7/1/2010 0 GAS 0 MPC -25A 8/1/2010 0 GAS 0 MPC -25A 9/1/2010 0 GAS 0 MPC -25A 10/1/2010 0 GAS 0 MPC -25A 11/1/2010 0 GAS 0 MPC -25A 12/1/2010 0 GAS 0 MPC -28A 1/1/2010 1,114.70 10 H2O 19,494 1,949.40 MPC -28A 1/1/2010 2,624.20 21 GAS 26,846 1,278.38 MPC -28A 2/1/2010 1,632.20 18 H2O 50,795 2,821.94 MPC -28A 3/1/2010 1,676.10 19 H2O 50,576 2,662 MPC -28A 4/1/2010 1,824.60 30 H2O 72,773 2,425.77 MPC -28A 5/1/2010 1,955.30 31 H2O 90,457 2,917.97 MPC -28A 6/1/2010 1,672.10 29 H2O 57,432 1,980.41 MPC -28A 7/1/2010 1,768.90 31 H2O 64,368 2,076.39 MPC -28A 8/1/2010 1,586 31 H2O 37,603 1,213.00 MPC -28A 9/1/2010 1,908.00 30 H2O 78,760 2,625.33 MPC -28A 10/1/2010 1,936.80 31 H2O 73,622 2,374.90 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Sw Name MPC -28A MPC -28A MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -36 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -39 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPC -42 MPCFP-2 MPCFP-2 MPCFP-2 MPCFP-2 MPCFP-2 Inj Vol Alloc (BBL, MCF) 71,778 87,057 22,025 22,974 23,120 23,235 17,376 19,669 22,517 21,636 15,881 25,279 23,761 21,373 10,407 10,167 18,240 2,075 24,343 26,002 18,711 17,402 14,704 20,861 19,273 28,562 37,252 40,046 3,009 25,164 36,811 40,367 31,125 25,690 9,922 22,199 36,283 39,492 40,285 33,931 48,458 0 0 0 0 0 Injection Rate (BBL, MCF) 2,392.60 2,808.29 710.48387 820.5 745.80645 774.5 827.42857 855.17391 750.56667 801.33333 794.05 815.45161 792.03333 689.45161 335.70968 363.11 793.04 230.56 811.43 928.64 813.52 644.52 668.36 695.37 688.32 952.06667 1,201.68 1,906.95 273.55 898.71 1,187.45 1,345.57 1,111.61 1,352.11 992.20 1,305.82 1,170.42 1,316.40 1,299.52 1,131.03 1,563.16 Wellhead Pres Days Month Avg (psi) Operating Product Code 11/1/2010 2,027.60 30 H2O 12/1/2010 2,071.30 31 H2O 1/1/2010 2, 397.70 31 H2O 2/1/2010 2,513.00 28 H2O 3/1/2010 2,526.60 31 H2O 4/1/2010 2,536.30 30 H2O 5/1/2010 2,330.80 21 H2O 6/1/2010 2,433.60 23 H2O 7/1/2010 2,409.80 30 H2O 8/1/2010 2,444.20 27 H2O 9/1/2010 2,429.10 20 H2O 10/1/2010 2,497 31 H2O 11/1/2010 2,523.80 30 H2O 12/1/2010 2,504.10 31 H2O 1/1/2010 4,204.90 31 GAS 2/1/2010 4,280.50 28 GAS 3/1/2010 2,710.60 23 H2O 3/1/2010 3,761.80 9 GAS 4/1/2010 2,853.00 30 H2O 5/1/2010 2,796.60 28 H2O 6/1/2010 2,796.80 23 H2O 7/1/2010 2,617.50 27 H2O 8/1/2010 2,556.40 22 H2O 9/1/2010 2,817.20 30 H2O 10/1/2010 2,773.10 28 H2O 11/1/2010 2,932.90 30 H2O 12/1/2010 3,120.00 31 H2O 1/1/2010 2,617.40 21 H2O 1/1/2010 3,992.90 11 GAS 2/1/2010 4,268.50 28 GAS 3/1/2010 4,212.40 31 GAS 4/1/2010 4,196.40 30 GAS 5/1/2010 4,075.80 28 GAS 6/1/2010 3,704.80 19 GAS 7/1/2010 1,581.80 10 H2O 7/1/2010 3,560.00 17 GAS 8/1/2010 1,789.40 31 H2O 9/1/2010 2,030.40 30 H2O 10/1/2010 2,173.20 31 H2O 11/1/2010 2,298.80 30 H2O 12/1/2010 2,482.80 31 H2O 1/1/2010 0 H2O 2/1/2010 0 H2O 3/1/2010 0 H2O 4/1/2010 0 H2O 5/1/2010 0 H2O Inj Vol Alloc (BBL, MCF) 71,778 87,057 22,025 22,974 23,120 23,235 17,376 19,669 22,517 21,636 15,881 25,279 23,761 21,373 10,407 10,167 18,240 2,075 24,343 26,002 18,711 17,402 14,704 20,861 19,273 28,562 37,252 40,046 3,009 25,164 36,811 40,367 31,125 25,690 9,922 22,199 36,283 39,492 40,285 33,931 48,458 0 0 0 0 0 Injection Rate (BBL, MCF) 2,392.60 2,808.29 710.48387 820.5 745.80645 774.5 827.42857 855.17391 750.56667 801.33333 794.05 815.45161 792.03333 689.45161 335.70968 363.11 793.04 230.56 811.43 928.64 813.52 644.52 668.36 695.37 688.32 952.06667 1,201.68 1,906.95 273.55 898.71 1,187.45 1,345.57 1,111.61 1,352.11 992.20 1,305.82 1,170.42 1,316.40 1,299.52 1,131.03 1,563.16 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPCFP-2 6/1/2010 0 H2O 0 MPCFP-2 7/1/2010 0 H2O 0 MPCFP-2 8/1/2010 0 H2O 0 MPCFP-2 9/1/2010 0 H2O 0 MPCFP-2 10/1/2010 0 H2O 0 MPCFP-2 11/1/2010 0 H2O 0 MPCFP-2 12/1/2010 0 H2O 0 MPE-02 1/1/2010 0 GAS 0 MPE-02 2/1/2010 0 GAS 0 MPE-02 3/1/2010 0 GAS 0 MPE-02 4/1/2010 0 GAS 0 MPE-02 5/1/2010 0 GAS 0 MPE-02 6/1/2010 0 GAS 0 MPE-02 7/1/2010 0 GAS 0 MPE-02 8/1/2010 0 GAS 0 MPE-02 9/1/2010 0 GAS 0 MPE-02 10/1/2010 0 GAS 0 MPE-02 11/1/2010 0 GAS 0 MPE-02 12/1/2010 0 GAS 0 MPE-03 1/1/2010 3,311.70 31 GAS 22,591 728.74 MPE-03 2/1/2010 3,346.70 23 GAS 7,297 317.26 MPE-03 3/1/2010 3,422.30 31 GAS 54,147 1,746.68 MPE-03 4/1/2010 3,596.90 30 GAS 71,745 2,391.50 MPE-03 5/1/2010 3,429.80 29 GAS 60,235 2,077.07 MPE-03 6/1/2010 3,567.10 24 GAS 42,368 1,765.33 MPE-03 7/1/2010 3,493.80 30 GAS 50,765 1,692.17 MPE-03 8/1/2010 3,468 25 GAS 32,666 1,306.64 MPE-03 9/1/2010 3,400.30 30 GAS 74,865 2,495.50 MPE-03 10/1/2010 3,510.60 31 GAS 74,646 2,407.94 MPE-03 11/1/2010 3,564.60 29 GAS 99,772 3,440.41 MPE-03 12/1/2010 3,544.30 30 GAS 84,899 2,829.97 MPE-05 1/1/2010 0 H2O 0 MPE-05 2/1/2010 0 H2O 0 MPE-05 3/1/2010 0 H2O 0 MPE-05 4/1/2010 0 H2O 0 MPE-05 5/1/2010 0 H2O 0 MPE-05 6/1/2010 1,762.10 11 H2O 15,777 1,434.27 MPE-05 7/1/2010 1,947.10 19 H2O 29,221 1,537.95 MPE-05 8/1/2010 2,133.80 30 H2O 53,294 1,776.47 MPE-05 9/1/2010 2,227.70 30 H2O 57,474 1,915.80 MPE-05 10/1/2010 2,180.70 31 H2O 46,253 1,492.03 MPE-05 11/1/2010 2,145.40 30 H2O 33,881 1,129.37 MPE-05 12/1/2010 2,097.30 31 H2O 26,104 842.06 MPE-07 1/1/2010 2,475.40 31 H2O 89,400 2,883.87 MPE-07 2/1/2010 2,474.40 28 H2O 77,752 2,776.86 MPE-07 3/1/2010 2,482.60 31 H2O 80,473 2,595.90 Exhibit 2-13 Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPE-07 4/1/2010 2,567.90 30 H2O 82,609 2,753.63 MPE-07 5/1/2010 2,584.30 5 H2O 13,733 2,746.60 MPE-07 6/1/2010 2,099.70 11 H2O 32,326 2,938.73 MPE-07 7/1/2010 1,549.20 18 H2O 18,451 1,025.06 MPE-07 8/1/2010 1,481.40 30 H2O 27,592 919.73 MPE-07 9/1/2010 1,524.50 30 H2O 29,688 989.60 MPE-07 10/1/2010 1,410.10 31 H2O 24,626 794.39 MPE-07 11/1/2010 1,852.90 30 H2O 65,202 2,173.40 MPE-07 12/1/2010 2,215.20 31 H2O 82,116 2,648.90 MPE-16 1/1/2010 0 H2O 0 MPE-16 2/1/2010 0 H2O 0 MPE-16 3/1/2010 0 H2O 0 MPE-16 4/1/2010 0 H2O 0 MPE-16 5/1/2010 0 H2O 0 MPE-16 6/1/2010 0 H2O 0 MPE-16 7/1/2010 0 H2O 0 MPE-16 8/1/2010 0 H2O 0 MPE-16 9/1/2010 0 H2O 0 MPE-16 10/1/2010 0 H2O 0 MPE-16 11/1/2010 0 H2O 0 MPE-16 12/1/2010 0 H2O 0 MPE-17 1/1/2010 2,501.40 31 H2O 60,072 1,937.81 MPE-17 2/1/2010 2,514.20 28 H2O 51,167 1,827 MPE-17 3/1/2010 2,498.20 31 H2O 57,319 1,849.00 MPE-17 4/1/2010 2,584.00 30 H2O 62,390 2,079.67 MPE-17 5/1/2010 2,529 31 H2O 65,210 2,103.55 MPE-17 6/1/2010 2,353.70 29 H2O 52,021 1,793.83 MPE-17 7/1/2010 2,470.80 30 H2O 68,810 2,293.67 MPE-17 8/1/2010 2,486 30 H2O 67,279 2,242.63 MPE-17 9/1/2010 2,604 30 H2O 87,158 2,905.27 MPE-17 10/1/2010 2,595.20 31 H2O 89,869 2,899.00 MPE-17 11/1/2010 2,632.00 30 H2O 87,406 2,913.53 MPE-17 12/1/2010 2,487.50 31 H2O 66,770 2,153.87 MPE-23 1/1/2010 2,480.70 31 H2O 111,290 3,590.00 MPE-23 2/1/2010 2,501.30 28 H2O 97,538 3,483.50 MPE-23 3/1/2010 2,486.60 31 H2O 106,420 3,432.90 MPE-23 4/1/2010 2,569.00 30 H2O 109,886 3,662.87 MPE-23 5/1/2010 2,421.50 29 H2O 104,805 3,613.97 MPE-23 6/1/2010 2,278.60 29 H2O 100,391 3,461.76 MPE-23 7/1/2010 2,006.00 29 H2O 78,906 2,720.90 MPE-23 8/1/2010 1,756.00 30 H2O 64,491 2,149.70 MPE-23 9/1/2010 1,717.70 30 H2O 65,234 2,174.47 MPE-23 10/1/2010 1,720.20 31 H2O 67,971 2,192.61 MPE-23 11/1/2010 1,866.90 30 H2O 78,728 2,624.27 MPE-23 12/1/2010 1,948.50 31 H2O 87,564 2,824.65 MPE-26 1/1/2010 2,515.40 31 H2O 62,376 2,012.13 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Sw Name Month MPE-26 2/1/2010 MPE-26 3/1/2010 MPE-26 4/1/2010 MPE-26 5/1/2010 MPE-26 6/1/2010 MPE-26 7/1/2010 MPE-26 8/1/2010 MPE-26 8/1/2010 MPE-26 9/1/2010 MPE-26 10/1/2010 MPE-26 11/1/2010 MPE-26 12/1/2010 MPF -10 1/1/2010 MPF -10 1/1/2010 MPF -10 2/1/2010 MPF -10 2/1/2010 MPF -10 3/1/2010 MPF -10 3/1/2010 MPF -10 4/1/2010 MPF -10 4/1/2010 MPF -10 5/1/2010 MPF -10 5/1/2010 MPF -10 6/1/2010 MPF -10 6/1/2010 MPF -10 7/1/2010 MPF -10 7/1/2010 MPF -10 8/1/2010 MPF -10 8/1/2010 MPF -10 9/1/2010 MPF -10 9/1/2010 MPF -10 10/1/2010 MPF -10 10/1/2010 MPF -10 11/1/2010 MPF -10 11/1/2010 MPF -10 12/1/2010 MPF -10 12/1/2010 MPF -13 10/1/2010 MPF -13 11/1/2010 MPF -13 12/1/2010 MPF -17 1/1/2010 MPF -17 2/1/2010 MPF -17 3/1/2010 MPF -17 4/1/2010 MPF -17 5/1/2010 MPF -17 6/1/2010 MPF -17 7/1/2010 Wellhead Pres Days Avg (psi) Operating Product Code 2,533.30 28 H2O 2,530.20 31 H2O 2,628.70 30 H2O 2,551.70 31 H2O 2,461.70 18 H2O 2,142.50 10 H2O 2,153.40 17 H2O 3,598.60 14 GAS 3,461.20 30 GAS 3,188 31 GAS 3,074.00 30 GAS 2,983.10 31 GAS 0 GAS 0 H2O 0 H2O 0 GAS 0 H2O 0 GAS 0 H2O 0 GAS 0 H2O 0 GAS 0 GAS 0 H2O 0 GAS 0 H2O 0 GAS 0 H2O 0 GAS 0 H2O 0 H2O 0 GAS 0 H2O 0 GAS 0 GAS 0 H2O 2,750.50 15 H2O 2,941.40 30 H2O 3,119.10 31 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O Inj Vol Alloc (BBL, MCF) 40,340 40,645 42,166 39,331 19,792 12,656 19,737 6,246 37,350 49,673 72,679 88,090 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14,518 44,931 59,510 0 0 0 0 0 0 0 Injection Rate (BBL, MCF) 1,440.71 1,311.13 1,405.53 1,268.74 1,099.56 1,265.60 1,161.00 446.14 1,245.00 1,602.35 2,422.63 2,841.61 967.87 1,497.70 1,919.68 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -17 8/1/2010 0 H2O 0 MPF -17 9/1/2010 0 H2O 0 MPF -17 10/1/2010 0 H2O 0 MPF -17 11/1/2010 0 H2O 0 MPF -17 12/1/2010 0 H2O 0 MPF -26 1/1/2010 3,626 31 GAS 37,301 1,203.26 MPF -26 2/1/2010 3,548.40 28 GAS 40,946 1,462.36 MPF -26 3/1/2010 1,769.20 28 H2O 47,405 1,693.04 MPF -26 3/1/2010 3,236.90 3 GAS 3,824 1,274.67 MPF -26 4/1/2010 1,677 30 H2O 37,794 1,259.80 MPF -26 5/1/2010 1,810.40 31 H2O 46,107 1,487.32 MPF -26 6/1/2010 1,739.80 20 H2O 27,662 1,383 MPF -26 7/1/2010 1,667.00 31 H2O 41,936 1,352.77 MPF -26 8/1/2010 1,783.40 31 H2O 42,129 1,359.00 MPF -26 9/1/2010 1,712.40 30 H2O 35,412 1,180.40 MPF -26 10/1/2010 1,632.90 31 H2O 35,338 1,139.94 MPF -26 11/1/2010 1,712.70 30 H2O 38,696 1,289.87 MPF -26 12/1/2010 1,787.80 31 H2O 44,002 1,419.42 MPF -30 1/1/2010 3,071.60 31 H2O 75,006 2,420 MPF -30 2/1/2010 3,293 28 H2O 59,427 2,122.39 MPF -30 3/1/2010 4,300.10 28 GAS 16,229 579.61 MPF -30 3/1/2010 2,960.10 4 H2O 5,912 1,478.00 MPF -30 4/1/2010 4,306.40 30 GAS 33,742 1,124.73 MPF -30 5/1/2010 3,421 2 GAS 2,264 1,132.00 MPF -30 5/1/2010 2,627.40 30 H2O 67,943 2,264.77 MPF -30 6/1/2010 2,663.80 18 H2O 33,081 1,837.83 MPF -30 7/1/2010 0 H2O 0 MPF -30 8/1/2010 2,292.70 26 H2O 52,261 2,010.04 MPF -30 9/1/2010 2,749.30 30 H2O 60,246 2,008.20 MPF -30 10/1/2010 2,553.20 31 H2O 46,971 1,515.19 MPF -30 11/1/2010 2,798.00 30 H2O 56,897 1,896.57 MPF -30 12/1/2010 2,884.80 31 H2O 58,912 1,900.39 MPF -41 1/1/2010 0 H2O 0 MPF -41 2/1/2010 0 H2O 0 MPF -41 3/1/2010 0 H2O 0 MPF -41 4/1/2010 0 H2O 0 MPF -41 5/1/2010 0 H2O 0 MPF -41 6/1/2010 0 H2O 0 MPF -41 7/1/2010 0 H2O 0 MPF -41 8/1/2010 0 H2O 0 MPF -41 9/1/2010 0 H2O 0 MPF -41 10/1/2010 0 H2O 0 MPF -41 11/1/2010 0 H2O 0 MPF -41 12/1/2010 0 H2O 0 MPF -42 1/1/2010 1,629.60 31 H2O 45,495 1,467.58 MPF -42 2/1/2010 2,032.20 28 H2O 59,514 2,125.50 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -42 3/1/2010 2,092.10 31 H2O 67,733 2,184.94 MPF -42 4/1/2010 2,191.30 30 H2O 61,710 2,057.00 MPF -42 5/1/2010 2,333.90 31 H2O 70,642 2,278.77 MPF -42 6/1/2010 2,267.60 20 H2O 40,820 2,041.00 MPF -42 7/1/2010 2,191.90 31 H2O 63,703 2,054.94 MPF -42 8/1/2010 2,413.30 31 H2O 68,043 2,195 MPF -42 9/1/2010 2,460.60 30 H2O 61,772 2,059.07 MPF -42 10/1/2010 2,295.50 31 H2O 53,317 1,719.90 MPF -42 11/1/2010 2,430.30 30 H2O 59,334 1,978 MPF -42 12/1/2010 2,403.90 31 H2O 57,777 1,863.77 MPF -46 1/1/2010 2,925.90 31 H2O 83,341 2,688.42 MPF -46 2/1/2010 3,002.40 28 H2O 63,718 2,275.64 MPF -46 3/1/2010 2,852.00 31 H2O 64,774 2,089.48 MPF -46 4/1/2010 2,629 30 H2O 48,729 1,624.30 MPF -46 5/1/2010 2,563.50 31 H2O 52,899 1,706.42 MPF -46 6/1/2010 2,340.80 20 H2O 31,540 1,577.00 MPF -46 7/1/2010 2,309.10 31 H2O 52,811 1,703.58 MPF -46 8/1/2010 2,438.50 31 H2O 52,867 1,705 MPF -46 9/1/2010 2,353.90 30 H2O 46,120 1,537.33 MPF -46 10/1/2010 2,178.20 31 H2O 42,519 1,371.58 MPF -46 11/1/2010 2,279.30 30 H2O 49,109 1,636.97 MPF -46 12/1/2010 2,279.40 31 H2O 51,127 1,649.26 MPF -49 1/1/2010 3,804.90 31 GAS 40,354 1,301.74 MPF -49 2/1/2010 3,888 28 GAS 45,358 1,620 MPF -49 3/1/2010 1,702.90 17 H2O 28,723 1,689.59 MPF -49 3/1/2010 3,830.90 14 GAS 15,279 1,091.36 MPF -49 4/1/2010 1,914.20 30 H2O 59,268 1,975.60 MPF -49 5/1/2010 2,074.70 31 H2O 68,471 2,208.74 MPF -49 6/1/2010 2,091.10 20 H2O 43,691 2,184.55 MPF -49 7/1/2010 2,058.90 31 H2O 66,109 2,132.55 MPF -49 8/1/2010 2,159.90 31 H2O 67,870 2,189.35 MPF -49 9/1/2010 2,331.60 30 H2O 75,910 2,530.33 MPF -49 10/1/2010 2,097.00 31 H2O 48,174 1,554.00 MPF -49 11/1/2010 2,040.50 30 H2O 45,484 1,516.13 MPF -49 12/1/2010 2,121.50 31 H2O 56,235 1,814.03 MPF -62 1/1/2010 835.20 31 H2O 57,924 1,869 MPF -62 2/1/2010 2,204 28 H2O 37,017 1,322.04 MPF -62 3/1/2010 2,555.30 31 H2O 45,976 1,483.10 MPF -62 4/1/2010 2,752.80 30 H2O 46,913 1,563.77 MPF -62 5/1/2010 2,750.50 31 H2O 48,566 1,566.65 MPF -62 6/1/2010 1,529.50 4 GAS 943 235.75 MPF -62 6/1/2010 2,638.30 19 H2O 27,762 1,461.16 MPF -62 7/1/2010 2,945.70 31 H2O 49,169 1,586 MPF -62 8/1/2010 3,176 31 H2O 50,349 1,624.16 MPF -62 9/1/2010 2,459.40 30 H2O 42,112 1,403.73 MPF -62 10/1/2010 1,290.40 31 H2O 31,677 1,021.84 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -62 11/1/2010 1,527.90 30 H2O 35,648 1,188.27 MPF -62 12/1/2010 1,278.30 31 H2O 34,902 1,125.87 MPF -70 1/1/2010 1, 799.20 31 H2O 64,143 2,069.13 MPF -70 2/1/2010 2,120.40 28 H2O 60,212 2,150.43 MPF -70 3/1/2010 2,038.20 31 H2O 59,754 1,927.55 MPF -70 4/1/2010 1,984.70 30 H2O 46,093 1,536.43 MPF -70 5/1/2010 3,843.50 30 GAS 37,268 1,242.27 MPF -70 5/1/2010 1,681.20 2 H2O 1,147 573.50 MPF -70 6/1/2010 3,384.20 20 GAS 29,752 1,487.60 MPF -70 7/1/2010 3,503 31 GAS 41,922 1,352 MPF -70 8/1/2010 1,638.00 7 H2O 8,833 1,261.86 MPF -70 8/1/2010 3,545.50 25 GAS 39,659 1,586.36 MPF -70 9/1/2010 1,448.20 30 H2O 43,801 1,460.03 MPF -70 10/1/2010 1,530.50 31 H2O 43,076 1,389.55 MPF -70 11/1/2010 1,558.70 30 H2O 38,027 1,267.57 MPF -70 12/1/2010 1,594.20 31 H2O 43,946 1,418 MPF -74 1/1/2010 0 H2O 0 MPF -74 2/1/2010 0 H2O 0 MPF -74 3/1/2010 0 H2O 0 MPF -74 4/1/2010 0 H2O 0 MPF -74 5/1/2010 0 H2O 0 MPF -74 6/1/2010 0 H2O 0 MPF -74 7/1/2010 0 H2O 0 MPF -74 8/1/2010 0 H2O 0 MPF -74 9/1/2010 0 H2O 0 MPF -74 10/1/2010 0 H2O 0 MPF -74 11/1/2010 0 H2O 0 MPF -74 12/1/2010 0 H2O 0 MPF -82 1/1/2010 0 GAS 0 MPF -82 2/1/2010 0 GAS 0 MPF -82A 3/1/2010 1,552.10 6 H2O 11,968 1,994.67 MPF -82A 4/1/2010 1,702.80 30 H2O 28,786 959.53 MPF -82A 5/1/2010 1,791.70 31 H2O 24,432 788.13 MPF -82A 6/1/2010 2,319 20 H2O 27,661 1,383.05 MPF -82A 7/1/2010 2,562 31 H2O 46,135 1,488.23 MPF -82A 8/1/2010 2,863.10 31 H2O 39,358 1,269.61 MPF -82A 9/1/2010 2,913 30 H2O 31,246 1,041.53 MPF -82A 10/1/2010 3,165.00 31 H2O 32,578 1,050.90 MPF -82A 11/1/2010 3,305.80 30 H2O 34,326 1,144.20 MPF -82A 12/1/2010 3,300.70 31 H2O 31,196 1,006.32 MPF -83 1/1/2010 3,568.20 31 GAS 31,655 1,021.13 MPF -83 2/1/2010 3,670.90 28 GAS 39,582 1,413.64 MPF -83 3/1/2010 3,636.30 31 GAS 30,689 989.97 MPF -83 4/1/2010 3,655.60 30 GAS 38,963 1,298.77 MPF -83 5/1/2010 2,946.90 2 GAS 1,915 957.5 MPF -83 5/1/2010 1,893.40 30 H2O 27,409 913.63333 Exhibit 2-G Sw Name Month MPF -83 6/1/2010 MPF -83 7/1/2010 MPF -83 8/1/2010 MPF -83 9/1/2010 MPF -83 10/1/2010 MPF -83 11/1/2010 MPF -83 12/1/2010 MPF -84B 1/1/2010 MPF -84B 2/1/2010 MPF -84B 3/1/2010 MPF -84B 4/1/2010 MPF -84B 5/1/2010 MPF -84B 6/1/2010 MPF -84B 7/1/2010 MPF -84B 8/1/2010 MPF -84B 9/1/2010 MPF -84B 10/1/2010 MPF -84B 11/1/2010 MPF -84B 12/1/2010 MPF -85 1/1/2010 MPF -85 2/1/2010 MPF -85 3/1/2010 MPF -85 4/1/2010 MPF -85 5/1/2010 MPF -85 6/1/2010 MPF -85 7/1/2010 MPF -85 8/1/2010 MPF -85 9/1/2010 MPF -85 10/1/2010 MPF -85 11/1/2010 MPF -85 12/1/2010 MPF -88 1/1/2010 MPF -88 2/1/2010 MPF -88 3/1/2010 MPF -88 4/1/2010 MPF -88 5/1/2010 MPF -88 6/1/2010 MPF -88 7/1/2010 MPF -88 8/1/2010 MPF -88 9/1/2010 MPF -88 10/1/2010 MPF -88 11/1/2010 MPF -88 12/1/2010 MPF -89 1/1/2010 MPF -89 2/1/2010 MPF -89 3/1/2010 Injection Rate and Pressure Data Wellhead Pres Days Avg (psi) Operating Product Code 1,650.80 20 H2O 1,727.60 25 H2O 0 H2O 1,753 1,762.40 1,726.40 1,875.30 1,998.90 1,867.00 1,777.10 1,975.80 1,897.50 1,581.50 1,679.00 1,739.60 3,014.40 3,190.00 3,201 3,021.70 3,007.50 2,368.90 2,897.10 3,042.50 2,844.50 2,738.80 2,941.40 3,120.60 1,543.60 1,381.00 1,208.00 1,181 1,367 1,237.20 1,265 1,475.40 1,322.90 1,148.10 1,292.40 1,271.80 3,145.60 0 H2O 0 H2O 0 H2O 0 H2O 31 H2O 28 H2O 31 H2O 30 H2O 31 H2O 20 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 31 H2O 28 H2O 31 H2O 30 H2O 31 H2O 20 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 31 H2O 28 H2O 31 H2O 30 H2O 31 H2O 20 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 24 H2O 0 H2O 0 H2O Milne Point Field Kuparuk River Pool Inj Vol Alloc Injection Rate (BBL, MCF) (BBL, MCF) 15,922 796.1 23,759 950.36 0 0 0 0 0 87,335 69,170 87,652 87,533 99,829 58,715 95,045 98,442 86,336 70,825 82,403 90,448 48,362 42,862 47,981 40,023 44,225 23,882 46,900 45,123 39,153 39,364 45,311 49,625 88,392 60,160 72,135 66,724 85,551 49,933 83,804 88,562 72,855 69,713 76,781 78,654 37,774 0 0 2,817 2,470.36 2,827.48 2,917.77 3,220.29 2,935.75 3,065.97 3,175.55 2,877.87 2,284.68 2,746.77 2,917.68 1,560.06 1,530.79 1,547.77 1,334 1,426.61 1,194.10 1,512.90 1,455.58 1,305.10 1,269.81 1,510.37 1,600.81 2,851.35 2,148.57 2,326.94 2,224.13 2,759.71 2,496.65 2,703.35 2,856.84 2,428.50 2,248.81 2,559.37 2,537.23 1,573.92 Exhibit 2-13 Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -89 4/1/2010 0 H2O 0 MPF -89 5/1/2010 0 H2O 0 MPF -89 6/1/2010 0 H2O 0 MPF -89 7/1/2010 1,786.40 11 H2O 15,554 1,414.00 MPF -89 8/1/2010 2,608.70 31 H2O 42,972 1,386 MPF -89 9/1/2010 2,942.60 30 H2O 41,329 1,377.63 MPF -89 10/1/2010 3,036.40 31 H2O 44,768 1,444.13 MPF -89 11/1/2010 3,208.80 30 H2O 56,364 1,878.80 MPF -89 12/1/2010 3,259.70 31 H2O 58,001 1,871.00 MPF -90 1/1/2010 0 H2O 0 MPF -90 2/1/2010 0 H2O 0 MPF -90 3/1/2010 0 H2O 0 MPF -90 4/1/2010 2,038.70 29 H2O 28,363 978.03 MPF -90 5/1/2010 2,508.20 31 H2O 29,788 960.90 MPF -90 6/1/2010 2,508.20 20 H2O 18,356 917.80 MPF -90 7/1/2010 2,385.20 16 H2O 11,957 747.31 MPF -90 7/1/2010 4,062.60 15 GAS 9,518 634.53 MPF -90 8/1/2010 4,317.50 31 GAS 49,606 1,600.19 MPF -90 9/1/2010 4,226.00 30 GAS 25,245 841.5 MPF -90 10/1/2010 2,661.80 10 H2O 8,964 896.4 MPF -90 10/1/2010 3,835.20 10 GAS 4,834 483.4 MPF -90 11/1/2010 2,807 30 H2O 28,406 946.86667 MPF -90 12/1/2010 2,987.60 31 H2O 32,327 1,042.81 MPF -91 1/1/2010 2,183.20 31 H2O 44,945 1,449.84 MPF -91 2/1/2010 2,126.00 28 H2O 36,769 1,313.18 MPF -91 3/1/2010 2,164.50 31 H2O 42,161 1,360.03 MPF -91 4/1/2010 2,301.60 30 H2O 44,754 1,491.80 MPF -91 5/1/2010 2,380.60 31 H2O 49,666 1,602.13 MPF -91 6/1/2010 2,179.90 20 H2O 28,628 1,431.40 MPF -91 7/1/2010 2,204.70 31 H2O 43,163 1,392.35 MPF -91 8/1/2010 2,278.10 31 H2O 43,322 1,397.48 MPF -91 9/1/2010 2,241.30 30 H2O 39,364 1,312.13 MPF -91 10/1/2010 2,055 31 H2O 34,053 1,098.48 MPF -91 11/1/2010 1,880.80 30 H2O 25,467 848.90 MPF -91 12/1/2010 1,820.30 10 H2O 7,853 785.30 MPF -92 1/1/2010 2,592.00 6 H2O 2,943 490.5 MPF -92 2/1/2010 2,460.30 20 H2O 25,238 1,261.90 MPF -92 3/1/2010 2,749.60 31 H2O 39,209 1,264.81 MPF -92 4/1/2010 2,825.50 30 H2O 30,782 1,026.07 MPF -92 5/1/2010 2,868.10 31 H2O 28,291 912.6129 MPF -92 6/1/2010 2,765.40 20 H2O 18,128 906.4 MPF -92 7/1/2010 2,871.70 31 H2O 27,543 888.48 MPF -92 8/1/2010 3,015.40 31 H2O 26,418 852.19355 MPF -92 9/1/2010 3,072.90 30 H2O 30,012 1,000.40 MPF -92 10/1/2010 3,123.80 31 H2O 29,361 947.12903 MPF -92 11/1/2010 3,243.70 30 H2O 37,775 1,259.17 Exhibit 2-G Sw Name Month MPF -92 12/1/2010 MPF -95 1/1/2010 MPF -95 2/1/2010 MPF -95 3/1/2010 MPF -95 4/1/2010 MPF -95 5/1/2010 MPF -95 6/1/2010 MPF -95 7/1/2010 MPF -95 8/1/2010 MPF -95 9/1/2010 MPF -95 10/1/2010 MPF -95 11/1/2010 MPF -95 12/1/2010 MPF -99 1/1/2010 MPF -99 2/1/2010 MPF -99 3/1/2010 MPF -99 4/1/2010 MPF -99 5/1/2010 MPF -99 6/1/2010 MPF -99 7/1/2010 MPF -99 8/1/2010 MPF -99 9/1/2010 MPF -99 10/1/2010 MPF -99 11/1/2010 MPF -99 12/1/2010 MPH -06 1/1/2010 MPH -06 2/1/2010 MPH -06 3/1/2010 MPH -06 4/1/2010 MPH -06 5/1/2010 MPH -06 6/1/2010 MPH -06 7/1/2010 MPH -06 8/1/2010 MPH -06 9/1/2010 MPH -06 10/1/2010 MPH -06 11/1/2010 MPH -06 12/1/2010 MPJ -11 1/1/2010 MPJ -11 2/1/2010 MPJ -11 3/1/2010 MPJ -11 4/1/2010 MPJ -11 5/1/2010 MPJ -11 6/1/2010 MPJ -11 7/1/2010 MPJ -11 8/1/2010 MPJ -11 9/1/2010 Injection Rate and Pressure Data Wellhead Pres Days Avg (psi) Operating Product Code 3,209 31 H2O 1,405.70 1,647.50 1,736.60 1,797 1,771 1,777.00 1,749.40 1,882.00 1,660.80 1,592 1,564.90 3,279.20 2,494.20 2,606.30 2,607.80 2,549.70 2,878 2,936.90 2,840 2,559.00 2,371.00 2,332.80 1,897.40 1,810.90 1,822.50 1,894.30 1,729.60 1,906.70 1,699.50 1,821.70 1,953.70 1,848.30 1,876.70 1,881.80 2,092.50 2,068.80 2,077.80 2,158.40 1,925.90 2,046.50 1,961.80 2,149.10 2,283.50 0 H2O 18 H2O 31 H2O 30 H2O 31 H2O 17 H2O 27 H2O 31 H2O 30 H2O 31 H2O 30 H2O 10 H2O 16 H2O 0 H2O 13 H2O 30 H2O 31 H2O 20 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 31 H2O 28 H2O 31 H2O 30 H2O 31 H2O 25 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 29 H2O 28 H2O 31 H2O 30 H2O 30 H2O 25 H2O 31 H2O 31 H2O 30 H2O Milne Point Field Kuparuk River Pool Inj Vol Alloc (BBL, MCF) 30,765 0 25,387 48,442 44,859 47,547 24,160 37,252 42,068 42,341 29,764 29,053 9,254 13,985 0 10,105 19,086 19,874 13,858 25,922 24,120 21,914 18,525 15,986 15,989 73,508 54,967 61,345 64,425 58,935 56,667 55,683 67,174 75,515 69,531 70,368 73,268 40,587 35,462 39,001 43,385 33,032 34,721 38,577 42,116 50,397 Injection Rate (BBL, MCF) 992.41935 1,410.39 1,562.65 1,495.30 1,533.77 1,421.18 1,379.70 1,357.03 1,411.37 960.13 968.43333 925.40 874.0625 777.30769 636.2 641.09677 692.9 836.19 778.06452 730.46667 597.58065 532.86667 515.77419 2,371.23 1,963.11 1,978.87 2,147.50 1,901.13 2,266.68 1,796.23 2,166.90 2,517.17 2,242.94 2,345.60 2,363.48 1,399.55 1,266.50 1,258.10 1,446.17 1,101.07 1,388.84 1,244.42 1,358.58 1,679.90 Exhibit 2-13 Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Sw Name Month MPJ -11 10/1/2010 MPJ -11 11/1/2010 MPJ -11 12/1/2010 MPJ -13 1/1/2010 MPJ -13 2/1/2010 MPJ -13 3/1/2010 MPJ -13 4/1/2010 MPJ -13 5/1/2010 MPJ -13 6/1/2010 MPJ -13 7/1/2010 MPJ -13 8/1/2010 MPJ -13 9/1/2010 MPJ -13 10/112010 MPJ -13 11/1/2010 MPJ -13 12/1/2010 MPJ -16 1/1/2010 MPJ -16 2/1/2010 MPJ -16 3/1/2010 MPJ -16 4/1/2010 MPJ -16 5/1/2010 MPJ -16 6/1/2010 MPJ -16 7/1/2010 MPJ -16 8/1/2010 MPJ -16 9/1/2010 MPJ -16 10/1/2010 MPJ -16 11/1/2010 MPJ -16 12/1/2010 MPK-18A 1/1/2010 MPK-18A 2/1/2010 MPK-18A 3/1/2010 MPK-18A 4/1/2010 MPK-18A 5/1/2010 MPK-18A 6/1/2010 MPK-18A 7/1/2010 MPK-18A 8/1/2010 MPK-18A 9/1/2010 MPK-18A 10/1/2010 MPK-18A 11/1/2010 MPK-18A 12/1/2010 MPK-21A 1/1/2010 MPK-21A 2/1/2010 MPK-21A 3/1/2010 MPK-21A 4/1/2010 MPK-21A 5/1/2010 MPK-21A 6/1/2010 MPK-21A 7/1/2010 Wellhead Pres Days Avg (psi) Operating Product Code 2,180.30 31 H2O 2,126.80 30 H2O 2,255.90 31 H2O 0 H2O 0 H2O 0 H2O 0 H2O 1,281.50 8 H2O 1,648.40 22 H2O 1,676.20 31 H2O 1,703 31 H2O 1,674.20 30 H2O 1,620.30 31 H2O 1,590.40 30 H2O 1,632.50 31 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O 0 H2O Inj Vol Alloc (BBL, MCF) 39,008 35,572 47,539 0 0 0 0 3,438 17,533 26,142 25,404 22,706 20,215 18,782 24,519 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Injection Rate (BBL, MCF) 1,258.32 1,185.73 1,533.52 429.75 796.95455 843.29032 819.48387 756.87 652.10 626.07 790.93548 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Inj Vol Alloc Injection Rate (BBL, MCF) (BBL, MCF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12,076 32,250 55,517 37,648 49,897 47,956 45,939 44,479 40,812 41,603 0 928.92 1,075.00 1,790.87 1,882.40 1,609.58 1,546.97 1,531.30 1,434.81 1,360.40 1,342 Wellhead Pres Days Sw Name Month Avg (psi) Operating Product Code MPK-21A 8/1/2010 0 H2O MPK-21A 9/1/2010 0 H2O MPK-21 A 10/1/2010 0 H2O MPK-21A 11/1/2010 0 H2O MPK-21A 12/1/2010 0 H2O MPK-22 1/1/2010 0 H2O MPK-22 2/1/2010 0 H2O MPK-22 3/1/2010 0 H2O MPK-22 4/1/2010 0 H2O MPK-22 5/1/2010 0 H2O MPK-22 6/1/2010 0 H2O MPK-22 7/1/2010 0 H2O MPK-22 8/1/2010 0 H2O MPK-22 9/1/2010 0 H2O MPK-22 10/1/2010 0 H2O MPK-22 11/1/2010 0 H2O MPK-22 12/1/2010 0 H2O MPK-43A 1/1/2010 0 H2O MPK-43A 2/1/2010 0 H2O MPK-43A 3/1/2010 0 H2O MPK-43A 4/1/2010 0 H2O MPK-43A 5/1/2010 0 H2O MPK-43A 6/1/2010 0 H2O MPK-43A 7/1/2010 0 H2O MPK-43A 8/1/2010 0 H2O MPK-43A 9/1/2010 0 H2O MPK-43A 10/1/2010 0 H2O MPK-43A 11/1/2010 0 H2O MPK-43A 12/1/2010 0 H2O MPL-08 1/1/2010 0 H2O MPL-08 2/1/2010 0 H2O MPL-08 3/1/2010 2,356.40 13 H2O MPL-08 4/1/2010 2,583 30 H2O MPL-08 5/1/2010 3,207.70 31 H2O MPL-08 6/1/2010 3,253.50 20 H2O MPL-08 7/1/2010 3,209.70 31 H2O MPL-08 8/1/2010 3,393.70 31 H2O MPL-08 9/1/2010 3,416 30 H2O MPL-08 10/1/2010 3,408.10 31 H2O MPL-08 11/1/2010 3,408.90 30 H2O MPL-08 12/1/2010 3,412.70 31 H2O MPL-09 1/1/2010 0 H2O MPL-09 2/1/2010 0 H2O MPL-09 3/1/2010 0 H2O MPL-09 4/1/2010 0 H2O MPL-09 5/1/2010 0 H2O Milne Point Field Kuparuk River Pool Inj Vol Alloc Injection Rate (BBL, MCF) (BBL, MCF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12,076 32,250 55,517 37,648 49,897 47,956 45,939 44,479 40,812 41,603 0 928.92 1,075.00 1,790.87 1,882.40 1,609.58 1,546.97 1,531.30 1,434.81 1,360.40 1,342 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Paas Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPL-09 6/1/2010 0 H2O 0 MPL-09 7/1/2010 1,157.70 12 H2O 9,975 831.25 MPL-09 8/1/2010 1,420.50 2 H2O 1,775 887.50 MPL-09 9/1/2010 0 H2O 0 MPL-09 10/1/2010 0 H2O 0 MPL-09 11/1/2010 0 H2O 0 MPL-09 12/1/2010 0 H2O 0 MPLA0 1/1/2010 0 H2O 0 MPL-10 2/1/2010 0 H2O 0 MPL-10 3/1/2010 0 H2O 0 MPL-10 4/1/2010 0 H2O 0 MPLA0 5/1/2010 0 H2O 0 MPLA0 6/1/2010 0 H2O 0 MPL-10 7/1/2010 0 H2O 0 MPL-10 8/1/2010 0 H2O 0 MPL-10 9/1/2010 0 H2O 0 MPLA0 10/1/2010 0 H2O 0 MPL-10 11/1/2010 0 H2O 0 MPL-10 12/1/2010 0 H2O 0 MPL-15 1/1/2010 3,204.70 31 H2O 91,088 2,938.32 MPL-15 2/1/2010 3,212.80 28 H2O 63,035 2,251.25 MPL-15 3/1/2010 2,950.60 31 H2O 54,659 1,763.19 MPLA5 4/1/2010 3,078.60 30 H2O 65,100 2,170.00 MPL-15 5/1/2010 3,102.20 31 H2O 68,011 2,193.90 MPL-15 6/1/2010 3,089.70 16 H2O 33,622 2,101.38 MPL-15 7/1/2010 0 H2O 0 MPL-15 8/1/2010 2,558.70 26 H2O 54,776 2,107 MPL-15 9/1/2010 2,764.90 30 H2O 56,346 1,878.20 MPL-15 10/1/2010 2,339.60 31 H2O 32,424 1,045.94 MPL-15 11/1/2010 2,396.30 30 H2O 39,057 1,301.90 MPL-15 12/1/2010 2,270 31 H2O 36,367 1,173.13 MPL-16A 1/1/2010 1,779.50 31 H2O 101,867 3,286.03 MPL-16A 2/1/2010 1,803.40 28 H2O 82,062 2,930.79 MPL-16A 3/1/2010 1,789 31 H2O 96,026 3,097.61 MPL-16A 4/1/2010 2,131 30 H2O 120,464 4,015.47 MPL-16A 5/1/2010 2,207.40 31 H2O 125,524 4,049.16 MPL-16A 6/1/2010 2,009 20 H2O 66,965 3,348.25 MPL-16A 7/1/2010 1,950.20 31 H2O 106,200 3,425.81 MPLA6A 8/1/2010 2,180.40 31 H2O 120,201 3,877.45 MPL-16A 9/1/2010 2,236.90 30 H2O 121,587 4,052.90 MPL-16A 10/1/2010 2,184.10 31 H2O 115,591 3,728.74 MPL-16A 11/1/2010 2,239.20 30 H2O 117,753 3,925.10 MPL-16A 12/1/2010 2,266.90 31 H2O 124,101 4,003.26 MPL-21 1/1/2010 0 GAS 0 MPL-21 2/1/2010 0 GAS 0 MPL-21 3/1/2010 0 GAS 0 Exhibit 2-G Sw Name Month MPL-21 4/1/2010 MPL-21 5/1/2010 MPL-21 6/1/2010 MPL-21 7/1/2010 MPL-21 8/1/2010 MPL-21 9/1/2010 MPL-21 10/1/2010 MPL-21 11/1/2010 MPL-21 12/1/2010 MPL-24 1/1/2010 MPL-24 2/1/2010 MPL-24 3/1/2010 MPL-24 4/1/2010 MPL-24 5/1/2010 MPL-24 5/1/2010 MPL-24 6/1/2010 MPL-24 7/1/2010 MPL-24 7/1/2010 MPL-24 8/1/2010 MPL-24 9/1/2010 MPL-24 10/1/2010 MPL-24 11/1/2010 MPL-24 12/1/2010 MPL-32 1/1/2010 MPL-32 2/1/2010 MPL-32 3/1/2010 MPL-32 4/1/2010 MPL-32 5/1/2010 MPL-32 6/1/2010 MPL-32 7/1/2010 MPL-32 8/1/2010 MPL-32 9/1/2010 MPL-32 10/1/2010 MPL-32 11/1/2010 MPL-32 12/1/2010 MPL-33 1/1/2010 MPL-33 2/1/2010 MPL-33 3/1/2010 MPL-33 4/1/2010 MPL-33 5/1/2010 MPL-33 6/1/2010 MPL-33 7/1/2010 MPL-33 8/1/2010 MPL-33 9/1/2010 MPL-33 10/1/2010 MPL-33 11/1/2010 Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) 2,793.90 2,899.10 3,036.60 3,101.00 2,226.70 4,321 4,254.20 2,658.90 3,994.60 3,002.80 3,225.40 3,268.50 3,333.50 3,356.60 3,262.80 3,270.90 3,321.60 3,269.40 2,459.00 2,918.40 3,074.60 2,992.80 2,884.10 2,968.40 3,047.80 3,214.80 3,150.60 2,958 3,248.10 3,316.50 3,111.90 3,033.30 3,221.80 2,351.50 2,314.20 2,958.70 0 GAS 0 GAS 0 GAS 0 GAS 0 GAS 0 GAS 0 GAS 0 GAS 0 GAS 31 H2O 28 H2O 31 H2O 30 H2O 1 H2O 28 GAS 18 GAS 16 H2O 8 GAS 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 31 H2O 28 H2O 24 H2O 30 H2O 0 H2O 3 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 31 H2O 31 H2O 28 H2O 31 H2O 30 H2O 31 H2O 20 H2O 31 H2O 31 H2O 30 H2O 31 H2O 30 H2O 0 0 0 0 0 0 0 0 0 43,336 36,958 51,170 49,548 695 5,500 15,398 24,372 11,461 52,688 58,630 57,537 57,044 57,845 45,164 33,135 30,216 33,524 0 3,912 39,143 36,606 30,794 28,194 32,840 35,046 151,014 112,995 112,044 147,197 156,525 85,195 140,396 150,038 49,664 82,930 118,306 1,397.94 1,319.93 1,650.65 1,651.60 695.00 196.43 855.44444 1,523.25 1,432.63 1,699.61 1,954.33 1,856.03 1,901.47 1,865.97 1,456.90 1,183.39 1,259.00 1,117.47 1,304.00 1,262.68 1,181 1,026.47 909.48 1,094.67 1,130.52 4,871 4,035.54 3,614.32 4,906.57 5,049.19 4,259.75 4,528.90 4,839.94 1,655.47 2,675.16 3,943.53 Exhibit 2-G Injection Rate and Pressure Data Milne Point Field Kuparuk River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPL-33 12/1/2010 2,995.70 31 H2O 115,467 3,724.74 MPL-34 1/1/2010 0 H2O 0 MPL-34 2/1/2010 0 H2O 0 MPL-34 3/1/2010 0 H2O 0 MPL-34 4/1/2010 0 H2O 0 MPL-34 5/1/2010 0 H2O 0 MPL-34 6/1/2010 0 H2O 0 MPL-34 7/1/2010 0 H2O 0 MPL-34 8/1/2010 0 H2O 0 MPL-34 9/1/2010 0 H2O 0 MPL-34 10/1/2010 0 H2O 0 MPL-34 11/1/2010 0 H2O 0 MPL-34 12/1/2010 0 H2O 0 MPL-39 1/1/2010 0 H2O 0 MPL-39 2/1/2010 0 H2O 0 MPL-39 3/1/2010 0 H2O 0 MPL-39 4/1/2010 0 H2O 0 MPL-39 5/1/2010 0 H2O 0 MPL-39 6/1/2010 0 H2O 0 MPL-39 7/1/2010 0 H2O 0 MPL-39 8/1/2010 0 H2O 0 MPL-39 9/1/2010 0 H2O 0 MPL-39 10/1/2010 0 H2O 0 MPL-39 11/1/2010 0 H2O 0 MPL-39 12/1/2010 0 H2O 0 MPL-42 1/1/2010 0 GAS 0 MPL-42 2/1/2010 0 GAS 0 MPL-42 3/1/2010 0 GAS 0 MPL-42 4/1/2010 0 GAS 0 MPL-42 5/1/2010 0 GAS 0 MPL-42 6/1/2010 0 GAS 0 MPL-42 7/1/2010 0 GAS 0 MPL-42 8/1/2010 0 GAS 0 MPL-42 9/1/2010 0 GAS 0 MPL-42 10/1/2010 0 GAS 0 MPL-42 11/1/2010 0 GAS 0 MPL-42 12/1/2010 0 GAS 0 3 Section 3 Schrader Bluff Oil Pool List of Exhibits Waterflood Pattern Map 3-A Total Reservoir Production Plot 3 -fl Total Reservoir Injection Plot 3-C Pertinent Data Summary 3-D Reservoir Voidage Balance 3-E Static Pressure Data 3-F Injection Rate & Pressure Data By Well 3-G Daily Allocation Factors 341 Schrader Bluff Oil Pool Waterflood Project Summary The Schrader Bluff Oil Pool waterflood area is shown in Exhibit 3-A. The locations of producing and injecting wells are shown, as are the interpreted hydraulic units. Each hydraulic unit represents regions of the reservoir that are believed to be hydraulically isolated due to faulting and/or lithologic controls. There were 50 producing wells and 43 injection wells active during 2010.1 Exhibit 3-B shows a production plot for the Schrader Bluff reservoir covering the entire project history through December 2010. The Schrader Bluff Oil Pool oil production averaged 8.8 MSTBD for 2010 compared to 9.1 MSTBD in 2010. This represents an oil production decrease of 3% in 2010. The 2010 production decrease is attributed to the natural fieldwide decline. 2010 gas production averaged 2.9 MMSCFD versus 4.3 MMSCFD in 2009. Water production averaged 15.3 MBWD in 2010 compared to 17.0 MBWD in 2010. Cumulative production since waterflood startup through the end of 2010 is 63.3 MMSTB of oil, 38.8 BSCF of gas, and 47.5 MMSTB of water. Exhibit 3-C shows an injection plot for the Schrader Bluff reservoir covering the entire project history through December 2010. The water injection rate averaged 29.9 MBWD for 2010 compared to 36.3 MBWD in 2009. This reduction of water injection rate is consistent with a reduction in total reservoir fluid offtake from 2009 to 2010. Cumulative water injection since waterflood startup through the end of 2010 is 125.9 MMSTB. Gas injection in the Schrader began in 2006 and continued through December 2008. Of the two patterns utilized for the WAG pilot, only the MPE-29 (injector) to MPE-24A (producer) pattern demonstrated signs of WAG interactions as characterized by the GOR response at the producer. No gas was injected in 2009 or 2010. Cumulative gas injection through the end of 2010 remains as it was at year-end 2008: 220 MMSCF. As of December 2010 the cumulative under injection is 29.7 MMRB. The cumulative under - injection in the Schrader Bluff reservoir is due to several factors: • Pre -production of early development wells • Economic constraints on drilling injection wells in the smaller hydraulic units • Occurrence of Matrix Bypass Events leading to reductions in the number of usable injection & offtake points In the supported waterflood patterns, under -injection is minimal. The average voidage replacement ratio, or VRR, for 2010 was 1. 13, a minimal decrease compared to the 2009 VRR of 1.18. A RWO in December of 2009 to convert MPJ -19 to injection also increased injection capacity, as the well was brought online in February 2010. Water cut decreased from 65.1% in 2009 to 63.4% in 2010. The decrease can be attributed to slightly better sweep efficiency across the reservoir with MPJ -19's added injection point. GOR 1 Note that the count of 43 injectors counts wells with a long string and short string dual completion as a single well. If long strings and short strings within a well were counted separately, there would be 55 active injectors. decreased from 472 SCF/STB in 2009 to 328 SCF/STB in 2010. Exhibit 3-D is a summary of the pertinent production information for the Schrader Bluff Oil Pool in 2010. Exhibit 3-E shows a monthly breakdown of production and injection data for the report period. Exhibit 3-F presents the reservoir pressure data for the Schrader Bluff wells taken during 2010. In 2010, 72 pressures were obtained in Schrader Bluff wells, 28 pressures were obtained in injectors and 44 pressures were obtained in producers. Exhibit 3-G provides a monthly summary of individual well injection rate and injection pressure data for all of the Schrader Bluff Oil Pool injectors. Exhibit 3-H provides daily oil, gas, and water allocation factors for the Milne Point facility for 2010. As the Milne Schrader reservoir shares surface flowlines and its processing facility with the Milne Kuparuk, Sag, and Ugnu Producing Areas, all allocation factors are calculated on a field level based on oil sales rate and are back allocated in proportion to the sum of the test rates for online wells. The average field oil allocation factor for 2010 was 0.92. This is an improvement from the 2009 average of 0.89, mostly due to the change in metering at the MPF- Pad for the full year, as well as the VSRD meter installed at MPG-Pad. For 2010, the water allocation factor averaged 1.15, and the gas allocation factor was 0.80. The water allocation factor improved over the 2009 average of 1.26 while the gas allocation factor worsened compared to 2009's average of 1.05. Future development plans for the Schrader Bluff oil pool include infill and pattern redevelopment in the S-pad and Tract 14 areas, potential expansion into undeveloped areas in the North West area of the pool, and the evaluation of EOR techniques suitable for Viscous Oil application. MPJ -09 MPJ -O9 MPJ -18 ' MP.LOt ALI _ MPJ-I5� MPJ -01A MPG -1] MPJ-I� • MPG -10 ! MPJ-;ALI WJ�Ia MPG -06 MPJ 7 NT MPIA9 MP.A05 MPGOi , ■P.G-DDA MPJ -30A •• wjl�~ / MPJ-23L1� m w�IEI,i� W S- MA17 MPJ -?0 MPI -14L1 �hty • W, AIIL30614 WJ•QT MPI-1'_LI MPI-12;2===— i MPI - I MPI-1� �-- MPEE-]1 .111-0M PE-J] L�R17� MP&�''/ MPE.OA ]CA �•PE-1_' MPCAIII I MPE-J2 MPGWA MPG -0y. MPG19 MPE-21 MPGt I MPG1641 MPE-IG MPGOG 1f M MPH -13A MPI -09 MPG01 MPGO'_ t `MPJ -OA MPJ -0J MPI -08 • 4rPr. • �MPt-9: MPH- , 00 tY MPF.OJ 17 � _ M".. mow 151 J�' 6p14. � M PG09 � r MKID— "may MP1+13 YPtitr MPH t?. MPI -10 • MPH -12 14�F-0J YPS14 >>D BP Alaska Exhibit 3-A 0 Schrader Bluff Hydraulic Unit Map Milne Point Unit - 2010 NB producer(njector NC, ND, or NE producer/injector OA producer/injector �/O OB producer/Injector Black Indicates shut-in or suspended Hydraulic Unit boundaries are drawn in light blue and represent regions of the reservoir that are believed to be hydraulically isolated due to faulting and/or lithologic controls. otsoo m MPS11 f MPE 25A MPE-'_9 MP -IL^_ oI MPs- ryIPSA1 L l 'IYIMPSOIALI MPSO; #PS -01A { MPS02 MPS -10 h IIWA MPs -11 1 Y�}WlL rAPSOB MP::2t MPH I I ' IPS-' 1 MPs-', )) YPfF� �i "Mao w MP 4PG.� MPS }t -IS m MPS11 f MPE 25A MPE-'_9 MP -IL^_ oI MPs- ryIPSA1 L l 'IYIMPSOIALI MPSO; #PS -01A { MPS02 MPS -10 h IIWA MPs -11 1 Y�}WlL rAPSOB 70010 ac C m` 50010 m f- F- N N cc m N 40010 c o 1; 30010 o �a IL m 20010 0 10010 Exhibit 3-B BP ALASKA - Milne Point Unit Schrader Reservoir, Total Production 100000 a 10000 c v N U. U N 1000 0 0 10 r r i i—i i i i i i i i 1 10 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 80 70 m c 60 J C 0 50 m v 0 40 a` 3 30 V m co 20 10 0 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 t Water Cut % SCH • Producers OnLine —K— Gas/Oil Rafio SCH Oil Prod Cum SCH --&--Water Prod Rate SCH Gas Prod Cum SCH t Oil Prod Rate SCH Water Prod Cum SCH --* — Gas Prod Rate SCH 12 10 0.8 0 0 0 0.6 a 0 C7 04 02 0.0 2010 prod uction_injection.xls 3/17/2011 1000000 v � LL N h 10000 _} m � f/7 N g _ o d 100 -- }- M N 40 40 35 m 30 c J c O 25 N v O m 20 C 15 10 5 0 Exhibit 3-C BP ALASKA - Milne Point Unit Schrader Reservoir, Injection r 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 -Water Inj Cum SCH __ Water Inj Rate SCH - Gas Inj Cum SCH X Gas Inj Rate SCH 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 L * Water Injectors OnLine Gas Injectors Online 2010 production_injection.xls 3/18/2011 Exhibit 3-D Milne Point Unit - Schrader Bluff Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2010 WATERFLOOD START-UP DATE: March 1992 PRODUCTION Prior to Waterflood Start -Up: Oil (MSTB) 902 Gas (MMSCF) 303 Water (MSTB) 136 Since Waterflood Start -Up: Oil (MSTB) 63,254 Gas (MMSCF) 38,844 Water (MSTB) 47,543 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 125,920 Injection Gas (MMSCF) 220 AVERAGE OF PRESSURES OBTAINED IN 2010 Cad 4,000' TVD ss December, 2010 Pressure (psig) 1,622 WELL COUNT (Wells in Oaeration)* Production Wells 50 WAG Injection 0 Water Only Injection 43 Gas Only Injection 0 Notes: * Reflects ONLY operating wells Exhibit 3-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Schrader Bluff Oil Pool January - December 2010 Production: Injection: Oil Water Gas Reservoir Water Gas Voida e Voidaqe Voida e Month Prod Rate Prod Rate Prod Rate Voida a In' Rate In' Rate Replacement Re lacement Balance stb/da 1 stb/da mscf/davl rbbl/day) (stb/day) (mscf/da rbbl/day) Ratio rbbl/da 1/31/2010 9247 17427 3201 29,631 32602 0 32,928 1.11 3,297 2/28/2010 8979 17690 3134 29,587 33627 0 33,963 1.15 4.377 3/31/2010 9694 17112 2857 29,297 32243 0 32,565 1.11 3,268 4/30/2010 10542 17128 3638 30,997 33226 0 33,559 1.08 2,561 5/31/2010 8471 14102 2658 24.850 32227 0 32,549 1.31 7,700 6/30/2010 8703 16625 2489 27,322 26065 0 26,326 0.96 -996 7/31/2010 8808 15411 2847 26,418 29341 0 29,635 1.12 3.217 8/31/2010 8606 14518 2580 25,256 30879 0 31,188 1.23 5,932 9/30/2010 7617 12621 2752 22,830 27343 0 27,617 1.21 4,78E 10/31/2010 7278 12304 2472 21.824 26023 0 26,283 1.20 4 459 11/30/2010 8298 13072 2970 24,146 :26605 0 26 871 1.11 2,725 12/31/2010 9269 15172 3291 27.507 28980 0 29,270 1.06 1,762 Average: 2010 8,809 15,265 2,891 26,639 29,930 0 30,229 113 3.591 Cumulative: mstb mstb mmscf mrb mstb mmscf mrb I I mrb 31 -Dec -10 64,156 1 47,679 39,147 157,204 1 125,920 220 127,511 1 0 81 1 29,693 Page 1 Exhibit' - Static r 'ire Data Sch Sluff Pool STATL ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RESERVOIR PRESSURE REPORT 1 Operator: BPXA 2 Address: 900 E. Benson Blvd Anchorage, Alaska 99508-4254 3, Unit or Lease Name' Mil" Point 4. Field and Pool: Schrader Bluff Pool 5 Datum Reference: 4000' SS 6 Oil Gravity: API = 14 -22 7 Gas Gravity: Air = 0 65 8 Well Name and 9 API Number 50 10 Oil (0) or Gas Number: xxx-xXxxX-xX-xX (G) 11 AOGCC Pool Code 12 Final Test Dale 13 Shut -In Time, Hours 14 Press Surv, Type (see instructions for codes) 15 BH Temp 16 Depth Tool TVDss 17 Final Pressure at Tool Depth 18 Datum TVDss (input) 19, Pressure Gradient, psi/ft 20 Comments Pressure at Datum (cal) Zone MPG -02 50-500-29219-26-00 PROD 525140 6/24/2010 120 PP 3,696.58 999 4.000 0.438 1,132 N MPG -04 50-500-29219-41-00 PROD 525140 11/23/2010 15,264 PP 3,629.12 1,530 4,000 0.439 1,693 OA+OB+N MPI -03 50-500-29220-67-00 PROD 525140 6/24/2010 120 IPP 3,584.61 1,109 4,000 1 0.441 1,292 1 OA+OB+N MPJ -01A 50-500-29220-70-01 IPROD 525140 11/23/2010 2,232 PP 3,279.66 1,021 4,000 0.440 1,338 OA+OB MPJ -02 50-500-29220-71-00 JINJ 525140 6/27/2010 8.026 S13HP 71 3,918.21 1,925 4,000 0.403 1,958 NB MPJ -04 50-500-29220-73-00 PROD 525140 11/23/2010 10,320 PP 3,44583 1,644 4,000 0.440 1,888 OA+OB+N MPG -08A 50-500-29221-41-01 PROD 525140 11/23/2010 19.752 PP 3,359.44 1,573 4,000 0.440 1.855 OA+OB+N MPJ -05 50-500-29221-96-00 PROD 525140 10/11/2010 1.152 PP _ 3,689.47 1,254 4.000 0.441 1,391 OA+OB+N MPJ -09,4 50-500-29224-95-01 PROD 525140 11/23/2010 18.168 PP 3,623.44 1,221 4.000 0.441 1,387 OA MPE-20A 50-500-29225-61-01 PROD 525140 4110/2010 1204 PP 87 4,167.16 1.356 4.000 0.425 1.285 NB+OA MPH -07A 50-500-29225-97-01 PROD 525140 7/14/2010 112,600 PP 3,973.30 1,187 4,000 0.449 1,199 OA+OB MPI -07 50-500-29226-02-00 PROD 525140 5/29/2010 72 PP 3,48348 1,078 4,000 0.439 1,305 OA+OB+N MPJ -19A 50-500-29226-07-01 INJ 525140 2/4/2010 240 SBHP 78 3,730.02 1,493 4,000 0.441 1,612 N MPJ -19A 50-500-29226-07-01 INJ 525140 2/4/2010 240 SBHP 77 3,871.76 1.230 4,000 0.437 1,286 OA MPJ -19A 50-500-29226-07-01 INJ 525140 2/4/2010 240 SBHP Bo 4.011.08 1.227 4.000 0.451 1.222 OB MPG -10 50-500-29227-80-00 INJ 525140 17[7/2010 251.83 SBHP 74 2,915.16 1,933 4,000 0.429 2,398 NB+OA+OB MPG -15 50-500-29227-84-00 PROD 525140 11/23/2010 1,392 PP 3,868.19 1,485 1 4,000 0.440 1,543 OA+OB+N MPH -10 50-500-29227-95-00 PROD 525140 11/16/2010 1,726 SBHP 80 3,723.07 1,425 4,000 0.036 1,435 N+OA+OB MPH -10 50-500-29227-95-00 PROD 525140 11/19/2010 1,750.20 SBHP 80 3.723.07 1.424 4,000 0.042 1.435.53 N+OA+OB MPH-OBB 50-500-29228-08-02 PROD 525140 6/21/2010 60 PP 78 13.65348 1,067.87 4,000 0.357 1.191.51 OA+OB MPH -13A 50-500-29228-18-01 PROD 525140 6%2412010 144 PP 3,860.42 991 4,000 1.003 1,131 N MPI -08 50-500-29228-21-00 INJ 525140 10%20%2010 342 SBHP 98 3,924.18 2,551 4,000 0.369 2,579 OB MPI -08 50-500-29228-21-00 INJ 525140 10/20/2010 342 SBHP 96 3,731.22 2,207 4,000 0.372 2,307 NB MP1-08 50-500-29228-21-00 INJ 525140 10/22/2010 342 SBHP 96 3,831.85 2,444 4,000 0.375 2,507 OA MPI -08 50-500-29228-21-00 INJ 525140 10/21/2010 365.82 SBHP 97 3,924.18 2.551 4.000 1.148 12,638.05 1 OA MPJ -18 50-500-29228-34-00 INJ 525140 8/31/2010 40.444 SBHP 79.2 3,976.10 1,920 4,000 0.448 1.909.30 OA MPE-30A 50-500-29229-03-01 PROD 525140 3/5%2010 528 SBHP 97 4,24329 1,302 4,000 0.390 1.207 OA MPI -09 50-500-29229-64-00 INJ 525140 6/15%2010 374.73 SBHP 3,770.66 12,461 4,000 0.262 2,521 NB MPI -09 50-500-29229-64-00 1NJ 525140 6/15/2010 374.73 SBHP 3,896.45 12.535 4,000 0.145 2,550 OA MPI -09 50-500-29229-64-00 1NJ 525140 6/15/2010 374.73 SBHP 3,92740 2,471 4,000 0.361 2,49722 0B MPJ -23 50-500-29229-70-00 PROD 525140 11/23/2010 5.568 PP 3.504.70 1,302 4,000 0.440 1,520 OA+OB MPE-25A 50-500-29229-80-01 INJ 525140 12/13/2010 9.696.82 SBHP 77 4.000 2.656 4,000 #DIV/01. 2.656 OA+OB MPI-13LS 50-500-29230-12-80 INJ 525140 7/22/2010 SBHP 40 2,131.72 844 4,000 0.527 1,829.40 OB MPI -138S 50-500-29230-12-81 INJ 525140 7%27/2010 SBHP 38 2,131.72 850 4,000 0.513 1,808 OA MPG -14 50-500-29230-31-00 PROD 525140 6/23/2010 96 PP 3,849.17 1,033 4,000 0438 1,099 OA+OB+N MPI -11 50-500-29230-33-00 PROD 525140 11/23/2010 1.680 PP 3,463.82 1,478 4,000 0.149 1.555 OA+OB MPI -12 50-500-29230-38-00 PROD 525140 5/31/2010 16.913.20 SBHP 48 2.510.44 1.1 . 40 4,000 0.396 1.730 OA+OB MPS -25 50-500-29230-89-00 PROD 525140 110%2010 514 SBHP 83 3,898.93 1,300 4,000 0.435 1,344 OA+OB MPS-13LS 50-500-29230-93-80 INJ 525140 10/28/2010 16,945 SBHP 79 3,999.77 1,293 4,000 0.000 1,293 OB MPS-13SS 50-500-29230-93-61 INJ 525140 10/28/2010 26.869 SBHP 79 3.999.77 1.282 4.000 0.000 1.282 OA MPS -23 50-500-29230-98-00 PROD 525140 5/11%2010 840 PP 4.010.22 1,353 4,000 0.391 1,349 OA+013 MPS -05 50-500-29231-00-00 PROD 525140 11/2/2010 1.440 SBHP 80.45 3,983.62 1,047.50 4,000 0.457 1,054.98 OA+OB MPS -03 50-500-29231-05-00 PROD 525140 10/9/2010 1,920 SBHP 4,053.43 1,155 4,000 0.442 1,131.40 OA MPI -15 50-500-29231-06-00 PROD 525140 11/23/2010 15,528 PP 3.665.46 1,524 4,000 0.439 1.671 OA+OB MPS -19A 50-500-29231-21-01 PROD 525140 10/13/2010 14675 SBHP 85 3.999.99 1.367 4.000 0.000 1.367 OA MPS-33ALS 50-500-29231-23-82 INJ 525140 71231-2010 960 SBHP 85 4,108.46 11,253 4,000 0.443 1,205 OB MPS-33ASS 50-500-29231-23-83 INJ 525140 7/23/2010 27,216 SBHP 81 3.999.68 1,105 1 4,000 0.000 1,105 OA NIPS-18LS 50-500-29231-33-80 INJ 525140 9/29/2010 355 SBHP 82 3,680.40 2.154 4,000 0.357 2,268 OB MPS-1BSS 50-500-29231-33-81 INJ 525140 9/2812010 332 SBHP 85 4,000.15 2,207 4,000 0.000 2,207 OA MPS -01A 50-500-29231-41-01 PROD 525140 1/4/2010 19,104 PP 3,996.87 1,852 4,000 0-319.0 11 OA+OB MPS -08 50-500-29231-68-00 PROD 525140 3/20%2010 7.25127 SBHP 71 3,802.19 1,393 4,000 0.409 1,473.99 NB MPS -08 50-500-29231-68-00 PROD 525140 1/30/2010 6,074.57 SBHP 175 3,900.07 1,377 4,000 0.370 1,413.96 1 JNB Exhibit S � Static , lure Data S& Bluff Pool o. WON Nam. Number. Arl Muirnmer bu xxx-)Lwxxx-xx-xx 10. OII (0) or Gas (G) 11 AOGCC Pool Code 12. Final Test Date 13 Shut -In Time, Hours i4 Press Sury Type (see instructions for codes) 15 Te mN 16. Depth Tool TVDss 17, Final Pressure at Tool Depth 18. Datum TVDss (input) 19 Pressure Gradient, psi/ft. 20. Comments Pressure at Datum (cal) Zone MPG-17LS 50-500-29231-92-80 INJ 525140 6/28/2010 346.67 jSBHP 75 4,094.53 2,991 4,000 0.444 2,949 OB MPG-17SS 50-500-29231-92-81 INJ 525140 6/28/2010 348 SBHP 73 4,014.19 2,569 4,000 0.493 2.582 OA MPG -18 50-500-29231-94-00 PROD 525140 5/29/2010 96 PP 4,022-26 1.041 4,000 0.449 1,031 OA MPI -14 50-500-29232-14-00 PROD 525140 6/23/2010 96 PP 3,591.88 1.114 4.000 0.441 1,294 OA+OB+N MPI -19 50-500-29232-18-00 PROD 525140 1%5/2010 8.967.52 SBHP 77 13,930.93 1,225 4,000 0.087 1,231 UA+013 MPI -19 50-500-29232-18-00 PROD 525140 5/2912010 96 PP 3,77218 986 4.000 0-439 1,086 OA+OB MPI -16 50-500-29232-21-00 INJ 525140 10/3/2010 667.6 SBHP 96 3,843.48 2,446 4,000 0-381 2,505.60 OB MPI -16 50-500-29232-21-00 INJ 525140 10/4/2010 677.62 SBHP 99 3,85781 2,339 4,000 0.190 2,366 OA MPI -16 50-500-29232-21-00 INJ 525140 10/4/2010 677.62 SBHP 96 3,715.99 2,460 4,000 0.324 2,552 NB MPH -16 50-500-29232-27-00 PROD 525140 5/29/2010 96 PP 3,863.03 1.036 4,000 0.438 1,096 OA+OS MPE-32 50-500-29232-61-00 PROD 525140 6/21/2010 48 SBHP 1 3,943.78 852 4,000 0.436 876.49 OA+NC+ND MPE-31 50-500-29232-63-00 PROD 525140 8/25/2010 46 SBHP 192 4,020.10 1,712 4,000 0.448 1,703 NC+ND MPE-31 50-500-29232-63-00 PROD 525140 8/26/2010 67.67 SBHP 92 4,020.10 1,713 4.000 0.409 1,704.78 NC+ND MPE-31 50-500-29232-63-00 PROD 525140 9/8/2010 336 SBHP 4,222.64 1,859 4,000 0.454 1,758 NC+IVU MPH -17 50-500-29233-58-00 INJ 525140 11/25/2010 2,004.70 SBHP 67.69 3,627.55 1,989 4,000 0.440 2,152.90 NB MPI -17 50-500-29232-12-00 PROD 525140 5/29/2010 96 PP 3,782.49 1,101 4,000 0.441 1,197 OA+OB+N MPS -24 50-500-29231-42-00 PROD 525140 6/11/2010 120 PP 3,883.01 1,637 4,000 2.462 1.349 NB MPS -32 50-500-29231-57-00 PROD 525140 7/10/2010 PP 3,753.79 1,473 4,000 0.439 1,561 INB MPG -16 50-500-29231-89-00 PROD 525140 10/27/2010 264 IPP 14154.21 943 4,000 0-441875 OA+OB MPS -34 50-500-29231-71-00 PROD 525140 9/14/2010 1,200 PP 3,995.61 1.256 4,000 0.456 1,258 NE+OA Avera a1,661 21 An tests reported Martin Were made in accordance with the applicable tukm, k"hons and msimclrons of the Alaska Od and Gas ConlNJalion Cofnrnlssmn. 1 haMby Certify Vail Ifle foregoing is "a and correCt to the beat of my N1110Wle126. Signature Title Printed Name Date FL Fluid Level PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP It -In Bottom Hole Pressure Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPB-02 1/1/2010 985.6 31 H2O 8,415 271.45161 MPB-02 2/1/2010 970.7 28 H2O 7,753 276.89286 MPB-02 3/1/2010 1,040.90 31 H2O 9,579 309 MPB-02 4/1/2010 1,085.90 30 H2O 12,330 411 MPB-02 5/1/2010 1,062.60 31 H2O 12,665 408.54839 MPB-02 6/1/2010 1,038.80 25 H2O 8,804 352.16 MPB-02 7/1/2010 1,008.30 31 H2O 10,162 327.80645 MPB-02 8/1/2010 1,088.70 6 H2O 2,726 454.33333 MPB-02 9/1/2010 0 H2O 0 MPB-02 10/1/2010 985.4 27 H2O 14,178 525.11111 MPB-02 11/1/2010 1,103.30 30 H2O 18,214 607.13333 MPB-02 12/1/2010 1,120.60 31 H2O 19,483 628.48387 MPJ -02 1/1/2010 0 H2O 0 MPJ -02 2/1/2010 0 H2O 0 MPJ -02 3/1/2010 0 H2O 0 MPJ -02 4/1/2010 0 H2O 0 MPJ -02 5/1/2010 0 H2O 0 MPJ -02 6/1/2010 4.4 1 H2O 1 1 MPJ -02 7/1/2010 0 H2O 0 MPJ -02 8/1/2010 0 H2O 0 MPJ -02 9/1/2010 0 H2O 0 MPJ -02 10/1/2010 0 H2O 0 MPJ -02 11/1/2010 0 H2O 0 MPJ -02 12/1/2010 0 H2O 0 MPI -02 1/1/2010 960 31 H2O 21,537 694.74194 MPI -02 2/1/2010 999.6 28 H2O 22,921 818.60714 MPI -02 3/1/2010 1,006.40 31 H2O 26,777 863.77419 MPI -02 4/1/2010 1,037.60 30 H2O 28,449 948.3 MPI -02 5/1/2010 988.7 31 H2O 27,988 902.83871 MPI -02 6/1/2010 924.1 20 H2O 18,215 910.75 MPI -02 7/1/2010 961.8 31 H2O 25,944 836.90323 MPI -02 8/1/2010 1,023.50 31 H2O 29,793 961.06452 MPI -02 9/1/2010 1,057 30 H2O 30,759 1,025.30 MPI -02 10/1/2010 1,028.70 31 H2O 25,523 823.32258 MPI -02 11/1/2010 1,042.60 30 H2O 26,564 885.46667 MPI -02 12/1/2010 1,054.20 31 H2O 29,323 945.90323 MPG -05 1/1/2010 1,160.20 31 H2O 15,675 505.64516 MPG -05 2/1/2010 1,162.60 28 H2O 14,078 502.78571 MPG -05 3/1/2010 1,179.60 24 H2O 13,129 547.04167 MPG -05 4/1/2010 0 H2O 0 MPG -05 5/1/2010 0 H2O 0 MPG -05 6/1/2010 0 H2O 0 MPG -05 7/1/2010 0 H2O 0 MPG -05 8/1/2010 0 H2O 0 MPG -05 9/1/2010 0 H2O 0 MPG -05 10/1/2010 0 H2O 0 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPG -05 11/1/2010 0 H2O 0 MPG -05 12/1/2010 0 H2O 0 MPG -07 1/1/2010 1,313.50 31 H2O 13,272 428.12903 MPG -07 2/1/2010 1,223.60 28 H2O 10,168 363.14286 MPG -07 3/1/2010 1,020.80 31 H2O 8,697 280.54839 MPG -07 4/1/2010 1,303.30 30 H2O 18,393 613.1 MPG -07 5/1/2010 1,179.60 31 H2O 12,596 406.32258 MPG -07 6/1/2010 1,173.80 19 H2O 8,040 423.15789 MPG -07 7/1/2010 1,343.90 31 H2O 11,060 356.77419 MPG -07 8/1/2010 1,310.90 31 H2O 10,977 354.09677 MPG -07 9/1/2010 1,183.40 30 H2O 10,682 356.06667 MPG -07 10/1/2010 1,254.10 31 H2O 13,135 423.70968 MPG -07 11/1/2010 1,326.50 30 H2O 9,731 324.36667 MPG -07 12/1/2010 1,256.50 31 H2O 10,703 345.25806 MPG -01 1/1/2010 1,005.90 31 H2O 26,020 839.35484 MPG -01 2/1/2010 1,002.80 28 H2O 22,371 798.96429 MPG -01 3/1/2010 1,022.20 31 H2O 24,337 785.06452 MPG -01 4/1/2010 1,081 30 H2O 28,446 948.2 MPG -01 5/1/2010 977.7 31 H2O 23,158 747.03226 MPG -01 6/1/2010 941.3 25 H2O 21,913 876.52 MPG -01 7/1/2010 942.5 31 H2O 16,647 537 MPG -01 8/1/2010 982.6 31 H2O 18,760 605.16129 MPG -01 9/1/2010 1,064.90 30 H2O 28,298 943.26667 MPG -01 10/1/2010 1,032.30 31 H2O 19,706 635.67742 MPG -01 11/1/2010 1,012.80 30 H2O 15,153 505.1 MPG -01 12/1/2010 1,023.10 31 H2O 16,304 525.93548 MPI -05 1/1/2010 837.1 31 H2O 19,882 641.35484 MPI -05 2/1/2010 865.4 28 H2O 24,763 884.39286 MPI -05 3/1/2010 880 31 H2O 29,384 947.87097 MPI -05 4/1/2010 895.5 30 H2O 28,671 955.7 MPI -05 5/1/2010 840.2 31 H2O 21,530 694.51613 MPI -05 6/1/2010 822.1 20 H2O 6,542 327.1 MPI -05 7/1/2010 854 31 H2O 20,211 651.96774 MPI -05 8/1/2010 869.2 31 H2O 15,722 507.16129 MPI -05 9/1/2010 878.7 30 H2O 18,275 609.16667 MPI -05 10/1/2010 877.6 31 H2O 22,035 710.80645 MPI -05 11/1/2010 883.1 30 H2O 16,734 557.8 MPI -05 12/1/2010 870.5 31 H2O 17,246 556.32258 MPJ -19A 2/1/2010 964.6 24 H2O 8,212 342.16667 MPJ -19A 3/1/2010 928.7 29 H2O 7,260 250.34483 MPJ -19A 4/1/2010 1,458.50 26 H2O 9,414 362.07692 MPJ -19A 5/1/2010 1,151.50 30 H2O 10,396 346.53333 MPJ -19A 6/1/2010 1,491.90 21 H2O 7,001 333.38095 MPJ -19A 7/1/2010 1,441.50 31 H2O 9,636 310.83871 MPJ -19A 8/1/2010 1,807 31 H2O 6,189 199.64516 MPJ -19A 9/1/2010 1,785.40 30 H2O 6,647 221.56667 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pros Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPJ -19A 10/1/2010 1,450.60 30 H2O 7,633 254.43333 MPJ -19A 11/1/2010 1,091.60 30 H2O 12,605 420.16667 MPJ -19A 12/1/2010 1,132 31 H2O 15,614 503.67742 MPG -09 1/1/2010 842.8 31 H2O 15,798 509.6129 MPG -09 2/1/2010 917.6 28 H2O 12,828 458.14286 MPG -09 3/1/2010 905.4 31 H2O 14,159 456.74194 MPG -09 4/1/2010 953.1 30 H2O 15,118 503.93333 MPG -09 5/1/2010 838.1 31 H2O 12,254 395.29032 MPG -09 6/1/2010 931.7 19 H2O 10,996 578.73684 MPG -09 7/1/2010 878.6 31 H2O 14,346 462.77419 MPG -09 8/1/2010 900.1 30 H2O 10,403 346.76667 MPG -09 9/1/2010 830 30 H2O 9,547 318.23333 MPG -09 10/1/2010 963.9 31 H2O 9,590 309.35484 MPG -09 11/1/2010 1,033 30 H2O 14,776 492.53333 MPG -09 12/1/2010 1,039 31 H2O 14,057 453.45161 MPG -13 1/1/2010 1,188.60 31 H2O 22,545 727.25806 MPG -13 2/1/2010 1,212.30 28 H2O 20,139 719.25 MPG -13 3/1/2010 1,167.50 31 H2O 13,223 426.54839 MPG -13 4/1/2010 1,208.60 30 H2O 21,768 725.6 MPG -13 5/1/2010 1,130.40 31 H2O 19,773 637.83871 MPG -13 6/1/2010 1,115 22 H2O 12,546 570.27273 MPG -13 7/1/2010 1,150.30 31 H2O 24,978 805.74194 MPG -13 8/1/2010 1,172.40 31 H2O 23,860 769.67742 MPG -13 9/1/2010 1,177.80 30 H2O 16,189 539.63333 MPG -13 10/1/2010 1,158.80 31 H2O 14,612 471.35484 MPG -13 11/1/2010 1,149.60 30 H2O 15,272 509.06667 MPG -13 12/1/2010 1,209 1 H2O 185 185 MPG -10 1/1/2010 792.6 31 H2O 23,395 754.67742 MPG -10 2/1/2010 824 28 H2O 23,478 838.5 MPG -10 3/1/2010 821.5 31 H2O 23,589 760.93548 MPG -10 4/1/2010 854.1 30 H2O 26,545 884.83333 MPG -10 5/1/2010 749.2 31 H2O 18,058 582.51613 MPG -10 6/1/2010 776.8 19 H2O 14,571 766.89474 MPG -10 7/1/2010 836.1 31 H2O 23,575 760.48387 MPG -10 8/1/2010 805.3 31 H2O 26,590 857.74194 MPG -10 9/1/2010 812.1 30 H2O 26,352 878.4 MPG -10 10/1/2010 781.7 31 H2O 23,480 757.41935 MPG -10 11/1/2010 840.2 26 H2O 18,744 720.92308 MPG -10 12/1/2010 788.8 23 H2O 20,790 903.91304 MPH -11 1/1/2010 1,371 31 H2O 15,284 493.03226 MPH -11 2/1/2010 1,426.10 28 H2O 16,253 580.46429 MPH -11 3/1/2010 1,426.80 31 H2O 18,981 612.29032 MPH -11 4/1/2010 756 30 H2O 17,142 571.4 MPH -11 5/1/2010 625.6 31 H2O 12,812 413.29032 MPH -11 6/1/2010 620.3 20 H2O 7,836 391.8 MPH -11 7/1/2010 707.4 28 H2O 16,548 591 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPH -11 8/1/2010 688.2 31 H2O 13,255 427.58065 MPH -11 9/1/2010 695.4 28 H2O 9,974 356.21429 MPH -11 10/1/2010 0 H2O 0 MPH -11 11/1/2010 0 H2O 0 MPH -11 12/1/2010 0 H2O 0 MPH -12 1/1/2010 945.7 31 H2O 4,926 158.90323 MPH -12 2/1/2010 974.9 28 H2O 4,587 163.82143 MPH -12 3/1/2010 968.6 31 H2O 4,373 141.06452 MPH -12 4/1/2010 1,007.50 30 H2O 6,844 228.13333 MPH -12 5/1/2010 921.9 31 H2O 5,770 186.12903 MPH -12 6/1/2010 986.8 20 H2O 10,258 512.9 MPH -12 7/1/2010 921.8 31 H2O 8,022 258.77419 MPH -12 8/1/2010 881.5 31 H2O 5,089 164.16129 MPH -12 9/1/2010 889.9 30 H2O 5,287 176.23333 MPH -12 10/1/2010 926 31 H2O 5,772 186.19355 MPH -12 11/1/2010 953.7 30 H2O 7,934 264.46667 MPH -12 12/1/2010 905.2 31 H2O 6,075 195.96774 MPI -08 1/1/2010 1,058.20 31 H2O 43,876 1,415.35 MPI -08 2/1/2010 1,092.60 28 H2O 37,574 1,341.93 MPI -08 3/1/2010 1,113.40 31 H2O 41,913 1,352.03 MPI -08 4/1/2010 1,136.90 30 H2O 44,960 1,498.67 MPI -08 5/1/2010 1,003.70 31 H2O 39,414 1,271.42 MPI -08 6/1/2010 1,062.30 23 H2O 29,469 1,281.26 MPI -08 7/1/2010 997 31 H2O 36,217 1,168.29 MPI -08 8/1/2010 1,029 31 H2O 39,847 1,285.39 MPI -08 9/1/2010 1,036.60 30 H2O 41,784 1,392.80 MPI -08 10/1/2010 1,055.40 15 H2O 19,915 1,327.67 MPI -08 11/1/2010 1,139.20 30 H2O 41,720 1,390.67 MPI -08 12/1/2010 1,121 31 H2O 38,968 1,257.03 MPJ -17 1/1/2010 1,029.10 29 H2O 28,642 987.65517 MPJ -17 2/1/2010 1,072.30 28 H2O 24,201 864.32143 MPJ -17 3/1/2010 1,043.50 31 H2O 22,047 711.19355 MPJ -17 4/1/2010 594.3 7 H2O 1,371 195.85714 MPJ -17 5/1/2010 673.9 31 H2O 13,345 430.48387 MPJ -17 6/1/2010 996.8 24 H2O 16,782 699.25 MPJ -17 7/1/2010 979.6 31 H2O 19,700 635.48387 MPJ -17 8/1/2010 1,030.80 31 H2O 24,859 801.90323 MPJ -17 9/1/2010 1,101.60 30 H2O 27,862 928.73333 MPJ -17 10/1/2010 1,018.20 31 H2O 26,164 844 MPJ -17 11/1/2010 1,089 30 H2O 25,457 848.56667 MPJ -17 12/1/2010 1,043.50 31 H2O 24,498 790.25806 MPJ -18 1/1/2010 1,058.80 29 H2O 13,207 455.41379 MPJ -18 2/1/2010 1,228.40 28 H2O 17,056 609.14286 MPJ -18 3/1/2010 1,173 31 H2O 14,055 453.3871 MPJ -18 4/1/2010 1,270.60 30 H2O 17,770 592.33333 MPJ -18 5/1/2010 1,199.30 31 H2O 14,751 475.83871 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPJ -18 6/1/2010 1,214.20 20 H2O 11,845 592.25 MPJ -18 7/1/2010 1,181.50 31 H2O 19,453 627.51613 MPJ -18 8/1/2010 1,149.90 29 H2O 13,085 451.2069 MPJ -18 9/1/2010 1,102.40 30 H2O 20,843 694.76667 MPJ -18 10/1/2010 1,186.10 31 H2O 20,752 669.41935 MPJ -18 11/1/2010 1,170.80 30 H2O 18,419 613.96667 MPJ -18 12/1/2010 1,197.90 31 H2O 26,551 856.48387 MPJ -15 1/1/2010 755.9 28 H2O 18,827 672.39286 MPJ -15 2/1/2010 775.4 28 H2O 18,447 658.82143 MPJ -15 3/1/2010 774.5 31 H2O 20,807 671.19355 MPJ -15 4/1/2010 771.3 30 H2O 21,444 714.8 MPJ -15 5/1/2010 746.6 31 H2O 23,081 744.54839 MPJ -15 6/1/2010 756.7 20 H2O 15,511 775.55 MPJ -15 7/1/2010 654 31 H2O 16,302 525.87097 MPJ -15 8/1/2010 726.8 31 H2O 22,900 738.70968 MPJ -15 9/1/2010 765.3 30 H2O 24,043 801.43333 MPJ -15 10/1/2010 731.7 31 H2O 19,087 615.70968 MPJ -15 11/1/2010 741.6 30 H2O 19,480 649.33333 MPJ -15 12/1/2010 763.8 31 H2O 22,309 719.64516 MPI -09 1/1/2010 1,106.70 31 H2O 45,133 1,455.90 MPI -09 2/1/2010 1,138.90 28 H2O 43,386 1,549.50 MPI -09 3/1/2010 1,162.90 31 H2O 48,844 1,575.61 MPI -09 4/1/2010 1,189.40 30 H2O 50,404 1,680.13 MPI -09 5/1/2010 1,123.30 30 H2O 43,732 1,457.73 MPI -09 6/1/2010 1,517.60 4 H2O 2,032 508 MPI -09 7/1/2010 985.4 31 H2O 44,939 1,449.65 MPI -09 8/1/2010 1,069.20 31 H2O 51,979 1,676.74 MPI -09 9/1/2010 1,082.60 30 H2O 51,710 1,723.67 MPI -09 10/1/2010 1,027.90 31 H2O 42,660 1,376.13 MPI -09 11/1/2010 1,069.20 30 H2O 46,510 1,550.33 MPI -09 12/1/2010 1,080.90 31 H2O 50,113 1,616.55 MPI -10 1/1/2010 592.1 31 H2O 17,787 573.77419 MPI -10 2/1/2010 584.5 28 H2O 13,061 466.46429 MPI -10 3/1/2010 567.2 8 H2O 2,865 358.125 MPI -10 4/1/2010 415.4 4 H2O 1,283 320.75 MPI -10 5/1/2010 524.9 31 H2O 16,346 527.29032 MPI -10 6/1/2010 519.1 20 H2O 10,563 528.15 MPI -10 7/1/2010 531.5 31 H2O 14,712 474.58065 MPI -10 8/1/2010 552.5 31 H2O 15,639 504.48387 MPI -10 9/1/2010 558.5 30 H2O 14,033 467.76667 MPI -10 10/1/2010 564.7 31 H2O 15,759 508.35484 MPI -10 11/1/2010 598.1 30 H2O 17,165 572.16667 MPI -10 12/1/2010 568.9 31 H2O 16,109 519.64516 MPJ -20A 1/1/2010 0 H2O 0 MPJ -20A 2/1/2010 0 H2O 0 MPJ -20A 3/1/2010 0 H2O 0 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPJ -20A 4/1/2010 0 H2O 0 MPJ -20A 5/1/2010 0 H2O 0 MPJ -20A 6/1/2010 0 H2O 0 MPJ -20A 7/1/2010 0 H2O 0 MPJ -20A 8/1/2010 0 H2O 0 MPJ -20A 9/1/2010 0 H2O 0 MPJ -20A 10/1/2010 0 H2O 0 MPJ -20A 11/1/2010 0 H2O 0 MPJ -20A 12/1/2010 0 H2O 0 MPE-29 1/1/2010 855.4 31 H2O 18,102 583.93548 MPE-29 2/1/2010 902.7 28 H2O 18,278 652.78571 MPE-29 3/1/2010 891.4 31 H2O 19,049 614.48387 MPE-29 4/1/2010 906.6 30 H2O 22,025 734.16667 MPE-29 5/1/2010 872.7 31 H2O 21,619 697.3871 MPE-29 6/1/2010 782.5 28 H2O 17,749 633.89286 MPE-29 7/1/2010 779.3 29 H2O 18,556 639.86207 MPE-29 8/1/2010 771.4 30 H2O 21,385 712.83333 MPE-29 9/1/2010 925.4 30 H2O 29,618 987.26667 MPE-29 10/1/2010 875.3 31 H2O 25,732 830.06452 MPE-29 11/1/2010 869.4 30 H2O 23,399 779.96667 MPE-29 12/1/2010 850.6 31 H2O 18,567 598.93548 MPI -13 8/1/2010 1,442.40 21 H2O 6,889 328.04762 MPI -13 9/1/2010 1,675.70 30 H2O 10,780 359.33333 MPI -13 10/1/2010 1,803.20 31 H2O 18,236 588.25806 MPI -13 11/1/2010 1,744.10 30 H2O 16,958 565.26667 MPI -13 12/1/2010 1,744.40 31 H2O 16,926 546 MPS -15 1/1/2010 0 H2O 0 MPS -15 2/1/2010 0 H2O 0 MPS -15 3/1/2010 0 H2O 0 MPS -15 4/1/2010 0 H2O 0 MPS -15 5/1/2010 0 H2O 0 MPS -15 6/1/2010 0 H2O 0 MPS -15 7/1/2010 0 H2O 0 MPS -15 8/1/2010 0 H2O 0 MPS -15 9/1/2010 0 H2O 0 MPS -15 10/1/2010 0 H2O 0 MPS -15 11/1/2010 0 H2O 0 MPS -15 12/1/2010 0 H2O 0 MPS -31 1/1/2010 1,165.10 31 H2O 24,681 796.16129 MPS -31 2/1/2010 1,153 28 H2O 21,334 761.92857 MPS -31 3/1/2010 1,156.40 31 H2O 23,493 757.83871 MPS -31 4/1/2010 1,183 30 H2O 23,209 773.63333 MPS -31 5/1/2010 1,152.60 30 H2O 26,265 875.5 MPS -31 6/1/2010 1,100.30 29 H2O 23,017 793.68966 MPS -31 7/1/2010 1,031.20 11 H2O 6,536 594.18182 MPS -31 8/1/2010 1,095.90 31 H2O 22,443 723.96774 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPS -31 9/1/2010 1,181.80 30 H2O 25,567 852.23333 MPS -31 10/1/2010 1,176.10 31 H2O 22,646 730.51613 MPS -31 11/1/2010 1,125.50 30 H2O 17,107 570.23333 MPS -31 12/1/2010 1,068.40 31 H2O 15,495 499.83871 MPS -21 1/1/2010 0 H2O 0 MPS -21 2/1/2010 0 H2O 0 MPS -21 3/1/2010 0 H2O 0 MPS -21 4/1/2010 0 H2O 0 MPS -21 5/1/2010 0 H2O 0 MPS -21 6/1/2010 0 H2O 0 MPS -21 7/1/2010 0 H2O 0 MPS -21 8/1/2010 0 H2O 0 MPS -21 9/1/2010 0 H2O 0 MPS -21 10/1/2010 0 H2O 0 MPS -21 11/1/2010 0 H2O 0 MPS -21 12/1/2010 0 H2O 0 MPS -09 1/1/2010 0 H2O 0 MPS -09 2/1/2010 0 H2O 0 MPS -09 3/1/2010 0 H2O 0 MPS -09 4/1/2010 0 H2O 0 MPS -09 5/1/2010 0 H2O 0 MPS -09 6/1/2010 0 H2O 0 MPS -09 7/1/2010 0 H2O 0 MPS -09 8/1/2010 0 H2O 0 MPS -09 9/1/2010 0 H2O 0 MPS -09 10/1/2010 0 H2O 0 MPS -09 11/1/2010 0 H2O 0 MPS -09 12/1/2010 0 H2O 0 MPE-13B 1/1/2010 996.5 31 H2O 31,617 1,019.90 MPE-1313 2/1/2010 1,045.90 28 H2O 32,721 1,168.61 MPE-136 3/1/2010 1,092.30 31 H2O 40,876 1,318.58 MPE-13B 4/1/2010 938.7 30 H2O 22,330 744.33333 MPE-13B 5/1/2010 1,079.60 31 H2O 26,945 869.19355 MPE-13B 6/1/2010 1,024.60 28 H2O 28,985 1,035.18 MPE-13B 7/1/2010 911.4 19 H2O 16,959 892.57895 MPE-136 8/1/2010 866.4 9 H2O 3,818 424.22222 MPE-136 9/1/2010 522.5 2 H2O 532 266 MPE-13B 10/1/2010 932.2 6 H2O 2,343 390.5 MPE-13B 11/1/2010 1,065.60 30 H2O 21,144 704.8 MPE-13B 12/1/2010 1,113 31 H2O 22,695 732.09677 MPS -07 1/1/2010 1,108.60 31 H2O 33,162 1,069.74 MPS -07 2/1/2010 1,058.30 28 H2O 28,724 1,025.86 MPS -07 3/1/2010 1,007.60 14 H2O 16,282 1,163 MPS -07 4/1/2010 1,089.60 30 H2O 35,225 1,174.17 MPS -07 5/1/2010 1,010.60 31 H2O 31,675 1,021.77 MPS -07 6/1/2010 1,074.90 28 H2O 37,008 1,321.71 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPS -07 7/1/2010 1,005.10 31 H2O 35,846 1,156.32 MPS -07 8/1/2010 1,078.90 31 H2O 45,972 1,482.97 MPS -07 9/1/2010 1,067.40 30 H2O 42,292 1,409.73 MPS -07 10/1/2010 1,030.90 31 H2O 39,087 1,260.87 MPS -07 11/1/2010 1,011.30 30 H2O 31,177 1,039.23 MPS -07 12/1/2010 1,018 31 H2O 34,892 1,125.55 MPS -11 1/1/2010 351.5 31 H2O 28,778 928.32258 MPS -11 2/1/2010 1,109.60 28 H2O 16,370 584.64286 MPS -11 3/1/2010 1,409.30 31 H2O 18,701 603.25806 MPS -11 4/1/2010 1,206.50 30 H2O 19,523 650.76667 MPS -11 5/1/2010 1,156.90 31 H2O 19,597 632.16129 MPS -11 6/1/2010 1,102.30 28 H2O 15,719 561.39286 MPS -11 7/1/2010 1,311.20 31 H2O 22,278 718.64516 MPS -11 8/1/2010 1,328.80 31 H2O 27,144 875.6129 MPS -11 9/1/2010 1,132.30 3 H2O 2,379 793 MPS -11 10/1/2010 0 H2O 0 MPS -11 11/1/2010 0 H2O 0 MPS -11 12/1/2010 268.8 2 H2O 613 306.5 MPS -13 1/1/2010 0 H2O 0 MPS -13 2/1/2010 0 H2O 0 MPS -13 3/1/2010 0 H2O 0 MPS -13 4/1/2010 0 H2O 0 MPS -13 5/1/2010 0 H2O 0 MPS -13 6/1/2010 0 H2O 0 MPS -13 7/1/2010 0 H2O 0 MPS -13 8/1/2010 0 H2O 0 MPS -13 9/1/2010 0 H2O 0 MPS -13 10/1/2010 0 H2O 0 MPS -13 11/1/2010 0 H2O 0 MPS -13 12/1/2010 0 H2O 0 MPS -30 1/1/2010 874.8 31 H2O 43,290 1,396.45 MPS -30 2/1/2010 934.1 28 H2O 43,830 1,565.36 MPS -30 3/1/2010 877 31 H2O 41,554 1,340.45 MPS -30 4/1/2010 860.1 30 H2O 35,184 1,172.80 MPS -30 5/1/2010 850.4 31 H2O 35,196 1,135.35 MPS -30 6/1/2010 834.2 29 H2O 32,991 1,137.62 MPS -30 7/1/2010 808.2 31 H2O 32,072 1,034.58 MPS -30 8/1/2010 908.7 31 H2O 40,022 1,291.03 MPS -30 9/1/2010 935.5 30 H2O 41,078 1,369.27 MPS -30 10/1/2010 988.7 31 H2O 40,438 1,304.45 MPS -30 11/1/2010 948 30 H2O 29,410 980.33333 MPS -30 12/1/2010 899.3 31 H2O 38,980 1,257.42 MPS -20 1/1/2010 1,053.30 31 H2O 35,223 1,136.23 MPS -20 2/1/2010 1,047.20 28 H2O 35,571 1,270.39 MPS -20 3/1/2010 1,018.80 31 H2O 39,738 1,281.87 MPS -20 4/1/2010 1,037.60 30 H2O 40,754 1,358.47 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPS -20 5/1/2010 1,021.10 31 H2O 44,096 1,422.45 MPS -20 6/1/2010 1,059 29 H2O 41,548 1,432.69 MPS -20 7/1/2010 963.3 31 H2O 41,409 1,335.77 MPS -20 8/1/2010 1,025.20 31 H2O 47,575 1,534.68 MPS -20 9/1/2010 964.4 30 H2O 43,689 1,456.30 MPS -20 10/1/2010 945.8 31 H2O 45,508 1,468 MPS -20 11/1/2010 934.1 30 H2O 42,907 1,430.23 MPS -20 12/1/2010 973.4 31 H2O 48,258 1,556.71 MPS -18 1/1/2010 680.1 31 H2O 44,434 1,433.35 MPS -18 2/1/2010 703.7 28 H2O 45,152 1,612.57 MPS -18 3/1/2010 657.4 31 H2O 39,449 1,272.55 MPS -18 4/1/2010 672.6 30 H2O 42,897 1,429.90 MPS -18 5/1/2010 630 31 H2O 41,540 1,340 MPS -18 6/1/2010 683 29 H2O 38,613 1,331.48 MPS -18 7/1/2010 688 31 H2O 44,295 1,428.87 MPS -18 8/1/2010 764.4 31 H2O 56,188 1,812.52 MPS -18 9/1/2010 678.5 14 H2O 16,063 1,147.36 MPS -18 10/1/2010 0 H2O 0 MPS -18 11/1/2010 0 H2O 0 MPS -18 12/1/2010 662.7 30 H2O 43,878 1,462.60 MPS -26 1/1/2010 908.3 31 H2O 45,922 1,481.35 MPS -26 2/1/2010 918 28 H2O 44,932 1,604.71 MPS -26 3/1/2010 967.3 31 H2O 50,784 1,638.19 MPS -26 4/1/2010 906.9 30 H2O 46,556 1,551.87 MPS -26 5/1/2010 924.2 31 H2O 52,774 1,702.39 MPS -26 6/1/2010 882.8 29 H2O 41,998 1,448.21 MPS -26 7/1/2010 859.4 31 H2O 42,830 1,381.61 MPS -26 8/1/2010 888.1 31 H2O 55,821 1,800.68 MPS -26 9/1/2010 835.5 30 H2O 49,300 1,643.33 MPS -26 10/1/2010 720 31 H2O 34,487 1,112.48 MPS -26 11/1/2010 670.6 30 H2O 24,045 801.5 MPS -26 12/1/2010 623.2 31 H2O 28,840 930.32258 MPS -16 1/1/2010 960.8 31 H2O 49,210 1,587.42 MPS -16 2/1/2010 1,044.80 28 H2O 49,693 1,774.75 MPS -16 3/1/2010 1,066.70 31 H2O 46,552 1,501.68 MPS -16 4/1/2010 894.5 30 H2O 38,086 1,269.53 MPS -16 5/1/2010 831.6 31 H2O 34,512 1,113.29 MPS -16 6/1/2010 878.9 28 H2O 32,427 1,158.11 MPS -16 7/1/2010 941.6 31 H2O 38,167 1,231.19 MPS -16 8/1/2010 1,038.80 31 H2O 51,136 1,649.55 MPS -16 9/1/2010 1,039.90 30 H2O 40,147 1,338.23 MPS -16 10/1/2010 1,057.50 31 H2O 40,280 1,299.35 MPS -16 11/1/2010 958 30 H2O 35,978 1,199.27 MPS -16 12/1/2010 941 31 H2O 40,447 1,304.74 MPS -14 1/1/2010 1,101.70 31 H2O 32,663 1,053.65 MPS -14 2/1/2010 1,091.50 28 H2O 30,502 1,089.36 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPS -14 3/1/2010 1,089.50 31 H2O 35,343 1,140.10 MPS -14 4/1/2010 988.3 30 H2O 22,859 761.96667 MPS -14 5/1/2010 916 31 H2O 21,143 682.03226 MPS -14 6/1/2010 898.6 28 H2O 18,655 666.25 MPS -14 7/1/2010 857.8 31 H2O 19,327 623.45161 MPS -14 8/1/2010 889.6 31 H2O 22,358 721.22581 MPS -14 9/1/2010 925.5 30 H2O 26,654 888.46667 MPS -14 10/1/2010 931 31 H2O 23,569 760.29032 MPS -14 11/1/2010 924.9 30 H2O 19,895 663.16667 MPS -14 12/1/2010 919.2 31 H2O 20,239 652.87097 MPS -06 1/1/2010 1,266.10 31 H2O 15,926 513.74194 MPS -06 2/1/2010 1,277.40 28 H2O 14,922 532.92857 MPS -06 3/1/2010 1,308.80 31 H2O 15,065 485.96774 MPS -06 4/1/2010 1,278.50 30 H2O 11,262 375.4 MPS -06 5/1/2010 1,242.90 31 H2O 12,036 388.25806 MPS -06 6/1/2010 1,106.90 28 H2O 11,564 413 MPS -06 7/1/2010 1,143.50 31 H2O 10,618 342.51613 MPS -06 8/1/2010 1,138.50 31 H2O 9,705 313.06452 MPS -06 9/1/2010 1,155.40 30 H2O 10,895 363.16667 MPS -06 10/1/2010 1,191 31 H2O 14,123 455.58065 MPS -06 11/1/2010 1,221.80 30 H2O 14,616 487.2 MPS -06 12/1/2010 1,242.40 31 H2O 14,362 463.29032 MPS -02 1/1/2010 779.8 31 H2O 32,371 1,044.23 MPS -02 2/1/2010 781.6 28 H2O 31,358 1,119.93 MPS -02 3/1/2010 847.8 31 H2O 38,210 1,232.58 MPS -02 4/1/2010 865.6 28 H2O 45,518 1,625.64 MPS -02 5/1/2010 910.3 31 H2O 54,048 1,743.48 MPS -02 6/1/2010 904.2 29 H2O 47,990 1,654.83 MPS -02 7/1/2010 806.8 31 H2O 48,599 1,567.71 MPS -02 8/1/2010 931.8 31 H2O 58,356 1,882.45 MPS -02 9/1/2010 845.9 30 H2O 55,690 1,856.33 MPS -02 10/1/2010 806.8 31 H2O 53,206 1,716.32 MPS -02 11/1/2010 908.2 27 H2O 31,676 1,173.19 MPS -02 12/1/2010 1,045.10 31 H2O 39,377 1,270.23 MPG -17 1/1/2010 1,196.60 31 H2O 23,610 761.6129 MPG -17 2/1/2010 1,298.40 28 H2O 25,184 899.42857 MPG -17 3/1/2010 1,356.10 31 H2O 27,070 873.22581 MPG -17 4/1/2010 1,404.20 30 H2O 27,735 924.5 MPG -17 5/1/2010 1,250.10 31 H2O 25,174 812.06452 MPG -17 6/1/2010 1,323.90 16 H2O 11,564 722.75 MPG -17 7/1/2010 1,371.70 31 H2O 23,048 743.48387 MPG -17 8/1/2010 1,322.70 31 H2O 20,581 663.90323 MPG -17 9/1/2010 1,365 30 H2O 24,345 811.5 MPG -17 10/1/2010 1,317.40 31 H2O 22,794 735.29032 MPG -17 11/1/2010 1,426.90 30 H2O 26,431 881.03333 MPG -17 12/1/2010 1,365.70 31 H2O 24,653 795.25806 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPE-25A 1/1/2010 0 H2O 0 MPE-25A 2/1/2010 0 H2O 0 MPE-25A 3/1/2010 0 H2O 0 MPE-25A 4/1/2010 0 H2O 0 MPE-25A 5/1/2010 0 H2O 0 MPE-25A 6/1/2010 0 H2O 0 MPE-25A 7/1/2010 0 H2O 0 MPE-25A 8/1/2010 0 H2O 0 MPE-25A 9/1/2010 0 H2O 0 MPE-25A 10/1/2010 0 H2O 0 MPE-25A 11/1/2010 0 H2O 0 MPE-25A 12/1/2010 0 H2O 0 MPI -16 1/1/2010 1,048.30 31 H2O 39,358 1,269.61 MPI -16 2/1/2010 1,049.30 28 H2O 34,225 1,222.32 MPI -16 3/1/2010 1,100.40 31 H2O 41,656 1,343.74 MPI -16 4/1/2010 1,130.40 30 H2O 43,431 1,447.70 MPI -16 5/1/2010 1,064.80 31 H2O 39,079 1,260.61 MPI -16 6/1/2010 1,064.50 25 H2O 33,756 1,350.24 MPI -16 7/1/2010 1,031 31 H2O 36,785 1,186.61 MPI -16 8/1/2010 1,070.20 31 H2O 38,372 1,237.81 MPI -16 9/1/2010 1,035.80 5 H2O 5,280 1,056 MPI -16 10/1/2010 956.8 28 H2O 29,623 1,057.96 MPI -16 11/1/2010 1,065.10 30 H2O 37,584 1,252.80 MPI -16 12/1/2010 1,142.70 31 H2O 44,502 1,435.55 MPG -19 1/1/2010 838.7 31 H2O 29,303 945.25806 MPG -19 2/1/2010 761.4 28 H2O 25,719 918.53571 MPG -19 3/1/2010 771.7 31 H2O 29,844 962.70968 MPG -19 4/1/2010 881.4 29 H2O 24,747 853.34483 MPG -19 5/1/2010 943.8 31 H2O 27,030 871.93548 MPG -19 6/1/2010 1,216.60 20 H2O 14,812 740.6 MPG -19 7/1/2010 1,087.20 24 H2O 17,096 712.33333 MPG -19 8/1/2010 975.5 31 H2O 19,856 640.51613 MPG -19 9/1/2010 993.6 30 H2O 21,940 731.33333 MPG -19 10/1/2010 1,065.90 31 H2O 25,710 829.35484 MPG -19 11/1/2010 920 28 H2O 19,729 704.60714 MPG -19 12/1/2010 1,143.50 31 H2O 17,469 563.51613 MPB-27 1/1/2010 1,110.40 31 H2O 20,425 658.87097 MPB-27 2/1/2010 1,108.70 28 H2O 17,641 630.03571 MPB-27 3/1/2010 1,125.10 31 H2O 17,344 559.48387 MPB-27 4/1/2010 1,175.40 30 H2O 25,678 855.93333 MPB-27 5/1/2010 1,223.30 31 H2O 31,040 1,001.29 MPB-27 6/1/2010 1,174.70 26 H2O 23,395 899.80769 MPB-27 7/1/2010 1,163.40 31 H2O 27,335 881.77419 MPB-27 8/1/2010 1,154 7 H2O 5,718 816.85714 MPB-27 9/1/2010 0 H2O 0 MPB-27 10/1/2010 1,091.20 28 H2O 15,888 567.42857 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPB-27 11/1/2010 1,113.40 30 H2O 12,238 407.93333 MPB-27 12/1/2010 1,165.30 31 H2O 12,859 414.80645 MPG -03A 1/1/2010 1,295.20 31 H2O 9,443 304.6129 MPG -03A 2/1/2010 1,458.90 28 H2O 12,924 461.57143 MPG -03A 3/1/2010 1,489.20 31 H2O 14,686 473.74194 MPG -03A 4/1/2010 1,313.40 30 H2O 10,742 358.06667 MPG -03A 5/1/2010 1,267.30 31 H2O 10,802 348.45161 MPG -03A 6/1/2010 1,582.60 19 H2O 11,446 602.42105 MPG -03A 7/1/2010 1,319.30 30 H2O 11,973 399.1 MPG -03A 8/1/2010 447.6 16 H2O 6,587 411.6875 MPG -03A 9/1/2010 327.7 2 H2O 596 298 MPG -03A 10/1/2010 699.6 7 H2O 1,670 238.57143 MPG -03A 11/1/2010 1,318.70 30 H2O 9,833 327.76667 MPG -03A 12/1/2010 1,590.40 31 H2O 7,811 251.96774 MPE-12 1/1/2010 832.4 31 H2O 23,910 771.29032 MPE-12 2/1/2010 808.4 28 H2O 17,758 634.21429 MPE-12 3/1/2010 899 31 H2O 21,516 694.06452 MPE-12 4/1/2010 925.3 30 H2O 22,339 744.63333 MPE-12 5/1/2010 882.1 31 H2O 21,319 687.70968 MPE-12 6/1/2010 831.2 28 H2O 17,313 618.32143 MPE-12 7/1/2010 829.4 29 H2O 20,122 693.86207 MPE-12 8/1/2010 846.4 30 H2O 19,780 659.33333 MPE-12 9/1/2010 618 1 H2O 453 453 MPE-12 10/1/2010 760.1 28 H2O 15,126 540.21429 MPE-12 11/1/2010 893.8 30 H2O 21,774 725.8 MPE-12 12/1/2010 927.6 31 H2O 16,578 534.77419 MPS -10A 1/1/2010 0 H2O 0 MPS -10A 2/1/2010 0 H2O 0 MPS -10A 3/1/2010 425.4 26 H2O 14,893 572.80769 MPS -10A 4/1/2010 454 30 H2O 22,064 735.46667 MPS -10A 5/1/2010 856.7 31 H2O 31,611 1,019.71 MPS -10A 6/1/2010 818.4 29 H2O 29,328 1,011.31 MPS -10A 7/1/2010 728.2 16 H2O 12,840 802.5 MPS -10A 8/1/2010 0 H2O 0 MPS -10A 9/1/2010 0 H2O 0 MPS -10A 10/1/2010 0 H2O 0 MPS -10A 11/1/2010 0 H2O 0 MPS -10A 12/1/2010 0 H2O 0 MPH -15 1/1/2010 1,160.80 31 H2O 25,775 831.45161 MPH -15 2/1/2010 1,089.30 28 H2O 10,202 364.35714 MPH -15 3/1/2010 1,153.30 29 H2O 15,787 544.37931 MPH -15 4/1/2010 1,218.20 30 H2O 22,539 751.3 MPH -15 5/1/2010 1,130.30 31 H2O 19,175 618.54839 MPH -15 6/1/2010 1,147.60 20 H2O 12,629 631.45 MPH -15 7/1/2010 1,127.80 31 H2O 20,916 674.70968 MPH -15 8/1/2010 1,127.50 31 H2O 20,227 652.48387 Exhibit 3-G Injection Rate and Pressure Data Milne Point Field Schrader Bluff Pool Wellhead Pres Days Product Inj Vol Alloc Injection Rate (BBL, Sw Name Month Avg (psi) Operating Code (BBL, MCF) MCF) MPH -15 9/1/2010 1,165.40 30 H2O 22,815 760.5 MPH -15 10/1/2010 1,181.40 31 H2O 24,887 802.80645 MPH -15 11/1/2010 1,161.60 30 H2O 22,343 744.76667 MPH -15 12/1/2010 1,187.10 31 H2O 26,895 867.58065 MPS -33A 1/1/2010 643.7 31 H2O 20,838 672.19355 MPS -33A 2/1/2010 633.8 28 H2O 17,562 627.21429 MPS -33A 3/1/2010 590 31 H2O 17,049 549.96774 MPS -33A 4/1/2010 591.1 30 H2O 19,470 649 MPS -33A 5/1/2010 138.5 31 H2O 22,788 735.09677 MPS -33A 6/1/2010 0 13 H2O 8,203 631 MPS -33A 7/1/2010 0 H2O 0 MPS -33A 8/1/2010 0 1 H2O 137 137 MPS -33A 9/1/2010 0 H2O 0 MPS -33A 10/1/2010 0 H2O 0 MPS -33A 11/1/2010 820.1 14 H2O 5,417 386.92857 MPS -33A 12/1/2010 978.4 31 H2O 12,657 408.29032 MPH -17 1/1/2010 1,050.90 31 H2O 28,389 915.77419 MPH -17 2/1/2010 1,074.80 28 H2O 25,682 917.21429 MPH -17 3/1/2010 1,077.70 31 H2O 30,561 985.83871 MPH -17 4/1/2010 978.6 30 H2O 22,266 742.2 MPH -17 5/1/2010 940.6 31 H2O 21,906 706.64516 MPH -17 6/1/2010 999.5 20 H2O 18,329 916.45 MPH -17 7/1/2010 958.9 31 H2O 29,526 952.45161 MPH -17 8/1/2010 989.5 31 H2O 25,513 823 MPH -17 9/1/2010 1,183.90 30 H2O 7,900 263.33333 MPH -17 10/1/2010 1,443 31 H2O 11,353 366.22581 MPH -17 11/1/2010 1,491.10 30 H2O 10,012 333.73333 MPH -17 12/1/2010 1,288.60 31 H2O 23,063 743.96774 Exhibit 3-H 2010 Facility Allocation Factors Milne Point Unit Milne Point Unit Allocation Factor Report 1/1/2010 - 12/31/2010 Date Oil Water Gas 01/01/10 0.95 1.15 0.85 01/02/10 0.94 1.14 0.82 01/03/10 0.85 1.15 0.81 01/04/10 0.98 1.14 0.81 01/05/10 0.93 1.18 0.80 01/06/10 0.92 1.17 0.82 01/07/10 0.93 1.13 0.83 01/08/10 0.97 1.18 0.83 01/09/10 0.93 1.18 0.80 01/10/10 0.92 1.18 0.82 01/11/10 0.93 1.17 0.85 01/12/10 0.93 1.20 0.83 01/13/10 0.93 1.15 0.84 01/14/10 0.92 1.18 0.86 01/15/10 0.93 1.17 0.85 01/16/10 0.92 1.15 0.85 01/17/10 0.92 1.20 0.85 01/18/10 0.94 1.18 0.85 01/19/10 0.93 1.17 0.87 01/20/10 0.91 1.17 0.86 01/21/10 0.94 1.17 0.85 01/22/10 0.94 1.17 0.85 01/23/10 0.88 1.17 0.83 01/24/10 0.93 1.15 0.82 01/25/10 0.93 1.16 0.83 01/26/10 0.94 1.16 0.84 01/27/10 0.93 1.18 0.85 01/28/10 0.92 1.17 0.84 01/29/10 0.95 1.17 0.84 01/30/10 0.95 1.16 0.83 01/31/10 0.95 1.16 0.82 02/01/10 0.93 1.13 0.85 02/02/10 0.93 1.11 0.84 02/03/10 0.91 1.13 0.79 02/04/10 0.93 1.18 0.87 02/05/10 0.95 1.18 0.86 02/06/10 0.97 1.19 0.90 02/07/10 0.95 1.19 0.90 02/08/10 0.93 1.15 0.90 02/09/10 0.97 1.15 0.85 02/10/10 0.92 1.18 0.80 02/11/10 0.94 1.25 0.78 02/12/10 0.95 1.09 0.78 02/13/10 0.95 1.11 0.79 02/14/10 0.94 1.05 0.80 02/15/10 0.94 1.03 0.81 02/16/10 0.96 1.05 0.83 02/17/10 0.93 1.06 0.89 Exhibit 3-H 2010 Facility Allocation Factors Date Oil Water Gas 02/18/10 0.98 1.06 0.91 02/19/10 0.93 1.07 0.92 02/20/10 0.96 1.16 0.95 02/21/10 0.98 1.08 0.89 02/22/10 0.88 1.21 0.78 02/23/10 0.95 1.15 0.86 02/24/10 0.97 1.11 0.88 02/25/10 0.94 1.10 0.89 02/26/10 1.02 1.10 0.87 02/27/10 0.98 1.12 0.85 02/28/10 0.97 1.12 0.85 03/01/10 0.94 1.12 0.81 03/02/10 0.95 1.09 0.80 03/03/10 0.98 1.11 0.79 03/04/10 0.96 1.13 0.81 03/05/10 0.94 1.10 0.77 03/06/10 0.96 1.11 0.76 03/07/10 0.96 1.09 0.76 03/08/10 0.94 1.11 0.75 03/09/10 0.92 1.09 0.76 03/10/10 0.90 1.09 0.75 03/11/10 0.92 1.08 0.74 03/12/10 0.93 1.11 0.74 03/13/10 0.89 1.11 0.75 03/14/10 0.84 1.10 0.72 03/15/10 0.99 1.06 0.76 03/16/10 0.93 1.06 0.79 03/17/10 0.88 1.26 0.90 03/18/10 0.91 1.03 0.80 03/19/10 0.98 1.09 0.82 03/20/10 0.89 1.08 0.83 03/21/10 1.00 1.12 0.81 03/22/10 0.93 1.11 0.79 03/23/10 0.94 1.09 0.80 03/24/10 0.93 1.12 0.80 03/25/10 0.96 1.07 0.80 03/26/10 0.92 1.09 0.82 03/27/10 0.96 1.10 0.81 03/28/10 0.87 1.09 0.78 03/29/10 0.99 1.10 0.77 03/30/10 0.94 1.07 0.77 03/31/10 0.92 1.10 0.79 04/01/10 0.94 1.09 0.75 04/02/10 0.95 1.11 0.71 04/03/10 0.95 1.10 0.76 04/04/10 0.95 1.08 0.77 04/05/10 0.95 1.06 0.79 04/06/10 0.89 1.09 0.79 04/07/10 0.96 1.10 0.85 04/08/10 0.95 1.10 0.81 04/09/10 0.92 1.13 0.87 Milne Point Unit Exhibit 3-H 2010 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 04/10/10 0.97 1.12 0.88 04/11/10 0.90 1.28 0.88 04/12/10 0.95 1.11 0.85 04/13/10 0.89 1.14 0.86 04/14/10 0.98 1.13 0.86 04/15/10 0.95 1.13 0.84 04/16/10 0.94 1.12 0.83 04/17/10 0.92 1.06 0.82 04/18/10 0.92 1.09 0.83 04/19/10 0.94 1.09 0.83 04/20/10 0.92 1.06 0.83 04/21/10 0.93 1.06 0.85 04/22/10 0.92 1.07 0.86 04/23/10 0.93 1.13 0.86 04/24/10 0.92 1.14 0.85 04/25/10 0.92 1.13 0.86 04/26/10 0.91 1.15 0.92 04/27/10 0.91 1.09 0.86 04/28/10 0.91 1.13 0.85 04/29/10 0.92 1.11 0.85 04/30/10 0.92 1.11 0.85 05/01/10 0.91 1.06 0.84 05/02/10 0.92 1.12 0.84 05/03/10 0.90 1.12 0.84 05/04/10 0.91 1.11 0.84 05/05/10 0.92 1.13 0.83 05/06/10 0.92 1.15 0.83 05/07/10 0.92 1.10 0.85 05/08/10 0.79 1.15 0.80 05/09/10 0.94 1.20 0.81 05/10/10 0.93 1.11 0.80 05/11/10 0.93 1.09 0.76 05/12/10 0.92 1.08 0.76 05/13/10 0.90 1.13 0.77 05/14/10 0.90 1.10 0.78 05/15/10 0.93 1.12 0.78 05/16/10 0.90 1.16 0.76 05/17/10 0.90 1.14 0.77 05/18/10 0.90 1.10 0.77 05/19/10 0.89 1.11 0.76 05/20/10 0.88 1.12 0.74 05/21/10 0.91 1.12 0.73 05/22/10 0.91 1.12 0.72 05/23/10 0.90 1.14 0.72 05/24/10 0.91 1.15 0.72 05/25/10 0.84 1.16 0.71 05/26/10 0.59 1.33 0.52 05/27/10 0.64 2.27 0.68 05/28/10 1.28 2.82 1.06 05/29/10 0.82 1.25 0.71 05/30/10 0.70 1.19 0.89 Exhibit 3-H 2010 Facility Allocation Factors Date Oil Water Gas 05/31/10 0.93 1.40 0.77 06/01/10 0.90 1.27 0.64 06/02/10 0.93 0.99 0.69 06/03/10 0.93 1.19 0.70 06/04/10 0.95 1.28 0.70 06/05/10 0.92 1.15 0.69 06/06/10 0.93 1.17 0.70 06/07/10 0.92 1.11 0.66 06/08/10 0.89 1.11 0.66 06/09/10 0.89 1.12 0.66 06/10/10 0.94 1.13 0.65 06/11/10 0.90 1.14 0.66 06/12/10 0.89 1.10 0.65 06/13/10 0.91 1.14 0.65 06/14/10 0.90 1.11 0.67 06/15/10 0.89 1.11 0.66 06/16/10 0.94 1.21 0.67 06/17/10 0.89 1.28 0.93 06/18/10 0.86 1.39 0.55 06/19/10 0.00 0.00 0.00 06/20/10 0.00 0.00 0.00 06/21/10 0.39 1.40 1.12 06/22/10 0.69 1.61 0.64 06/23/10 0.65 1.35 0.55 06/24/10 0.77 1.26 0.58 06/25/10 0.80 1.21 0.64 06/26/10 0.80 1.05 0.67 06/27/10 0.89 1.09 0.86 06/28/10 0.95 1.03 0.80 06/29/10 0.95 1.17 0.77 06/30/10 0.95 1.18 0.77 07/01/10 0.94 1.15 0.76 07/02/10 0.95 1.15 0.74 07/03/10 0.97 1.09 0.75 07/04/10 0.83 1.03 0.71 07/05/10 0.76 1.58 0.75 07/06/10 0.73 0.99 0.60 07/07/10 0.76 1.04 0.56 07/08/10 0.78 1.09 0.56 07/09/10 0.80 1.19 0.61 07/10/10 0.85 1.13 0.61 07/11/10 0.93 1.12 0.73 07/12/10 0.92 1.09 0.66 07/13/10 0.96 1.07 0.66 07/14/10 0.90 1.04 0.68 07/15/10 0.91 1.10 0.66 07/16/10 0.91 1.09 0.71 07/17/10 0.85 1.09 0.71 07/18/10 0.95 1.08 0.69 07/19/10 0.90 1.09 0.70 07/20/10 0.92 1.08 0.71 Milne Point Unit Exhibit 3-H 2010 Facility Allocation Factors Date Oil Water Gas 07/21/10 0.92 1.07 0.72 07/22/10 0.92 1.09 0.73 07/23/10 0.92 1.13 0.74 07/24/10 0.93 1.11 0.75 07/25/10 0.91 1.11 0.74 07/26/10 0.91 1.07 0.75 07/27/10 0.89 1.12 0.75 07/28/10 0.88 1.11 0.65 07/29/10 0.85 1.12 0.64 07/30/10 0.91 1.08 0.67 07/31/10 0.85 1.12 0.62 08/01/10 0.85 1.17 0.68 08/02/10 0.87 1.16 0.68 08/03/10 0.92 1.10 0.73 08/04/10 0.92 1.10 0.73 08/05/10 0.91 1.11 0.74 08/06/10 0.92 1.11 0.76 08/07/10 0.93 1.12 0.79 08/08/10 0.94 1.07 0.78 08/09/10 0.95 1.13 0.80 08/10/10 0.95 1.14 0.80 08/11/10 0.95 1.10 0.77 08/12/10 0.94 1.11 0.75 08/13/10 0.96 1.09 0.77 08/14/10 0.96 1.10 0.77 08/15/10 0.96 1.12 0.79 08/16/10 0.93 1.11 0.80 08/17/10 0.96 1.13 0.80 08/18/10 0.95 1.12 0.80 08/19/10 0.93 1.14 0.84 08/20/10 0.97 1.14 0.78 08/21/10 0.97 1.13 0.77 08/22/10 0.95 1.12 0.78 08/23/10 0.96 1.15 0.76 08/24/10 0.94 1.10 0.77 08/25/10 0.93 1.11 0.74 08/26/10 0.91 1.11 0.75 08/27/10 0.97 1.12 0.75 08/28/10 0.93 1.15 0.75 08/29/10 0.92 1.13 0.75 08/30/10 0.92 1.13 0.77 08/31/10 0.93 1.11 0.78 09/01/10 0.92 1.13 0.81 09/02/10 0.90 1.13 0.79 09/03/10 0.93 1.13 0.78 09/04/10 0.94 1.13 0.77 09/05/10 0.95 1.09 0.75 09/06/10 0.95 1.10 0.75 09/07/10 0.94 1.12 0.75 09/08/10 0.93 1.12 0.74 09/09/10 0.98 1.11 0.75 Milne Point Unit Exhibit 3-H 2010 Facility Allocation Factors Date Oil Water Gas 09/10/10 0.95 1.13 0.77 09/11/10 0.96 1.13 0.78 09/12/10 0.96 1.14 0.79 09/13/10 0.95 1.14 0.80 09/14/10 0.94 1.16 0.84 09/15/10 0.95 1.16 0.85 09/16/10 0.94 1.17 0.85 09/17/10 0.93 1.16 0.86 09/18/10 0.95 1.11 0.86 09/19/10 0.95 1.16 0.87 09/20/10 0.96 1.12 0.84 09/21/10 0.95 1.12 0.88 09/22/10 0.95 1.14 0.87 09/23/10 0.95 1.16 0.86 09/24/10 0.95 1.13 0.86 09/25/10 0.96 1.16 0.85 09/26/10 0.94 1.17 0.83 09/27/10 0.92 1.17 0.79 09/28/10 0.93 1.14 0.78 09/29/10 0.93 1.17 0.82 09/30/10 0.92 1.16 0.83 10/01/10 0.95 1.12 0.75 10/02/10 0.96 1.12 0.81 10/03/10 0.94 1.11 0.83 10/04/10 0.94 1.14 0.83 10/05/10 0.95 1.12 0.83 10/06/10 0.95 1.14 0.85 10/07/10 0.94 1.19 0.85 10/08/10 0.85 1.95 0.94 10/09/10 0.91 1.94 0.66 10/10/10 0.91 1.92 0.72 10/11/10 0.93 1.56 0.86 10/12/10 0.92 1.36 0.77 10/13/10 0.91 1.28 0.71 10/14/10 0.89 1.18 0.74 10/15/10 0.93 1.19 0.77 10/16/10 0.91 1.23 0.76 10/17/10 0.92 1.17 0.78 10/18/10 0.91 1.16 0.80 10/19/10 0.97 1.14 0.78 10/20/10 0.94 1.18 0.80 10/21/10 0.95 1.14 0.82 10/22/10 0.95 1.13 0.83 10/23/10 0.93 1.11 0.82 10/24/10 0.92 1.11 0.83 10/25/10 0.94 1.14 0.84 10/26/10 0.94 1.11 0.87 10/27/10 0.95 1.09 0.90 10/28/10 0.95 1.08 0.89 10/29/10 0.95 1.08 0.91 10/30/10 0.97 1.11 0.92 Milne Point Unit Exhibit 3-H 2010 Facility Allocation Factors Milne Point Unit Date Oil Water Gas 10/31/10 0.95 1.12 0.92 11/01/10 0.93 112 0.91 11/02/10 0.97 1.08 0.90 11/03/10 0.91 1.07 0.87 11/04/10 0.92 1.07 0.85 11/05/10 0.87 1.06 0.88 11/06/10 0.92 1.18 0.88 11/07/10 0.93 1.22 0.90 11/08/10 0.95 1.14 0.85 11/09/10 0.93 1.11 0.87 11/10/10 0.92 1.09 0.88 11/11/10 0.93 1.12 0.86 11/12/10 0.91 1.17 0.87 11/13/10 0.93 1.16 0.88 11/14/10 0.93 1.16 0.87 11/15/10 0.94 1.13 0.83 11/16/10 0.93 1.13 0.84 11/17/10 0.95 1.16 0.87 11/18/10 0.93 1.13 0.85 11/19/10 0.93 1.17 0.85 11/20/10 0.91 1.16 0.90 11/21/10 0.91 1.15 0.83 11/22/10 0.91 1.15 0.82 11/23/10 0.91 1.16 0.83 11/24/10 0.89 1.13 0.85 11/25/10 0.91 1.11 0.85 11/26/10 0.91 1.11 0.84 11/27/10 0.97 1.13 0.84 11/28/10 0.94 1.14 0.84 11/29/10 0.97 1.15 0.82 11/30/10 0.96 1.12 0.82 12/01/10 0.95 1.13 0.80 12/02/10 0.87 1.13 0.81 12/03/10 1.06 1.26 0.83 12/04/10 0.95 1.22 0.80 12/05/10 0.96 1.28 0.83 12/06/10 0.96 1.23 0.79 12/07/10 0.96 1.23 0.97 12/08/10 0.96 1.19 0.86 12/09/10 0.95 1.19 0.81 12/10/10 0.96 1.14 0.83 12/11/10 0.96 1.14 0.89 12/12/10 0.96 1.16 0.91 12/13/10 0.97 1.18 0.91 12/14/10 0.95 1.15 0.90 12/15/10 0.96 1.15 0.91 12/16/10 0.96 1.19 0.92 12/17/10 0.96 1.16 0.91 12/18/10 0.94 1.16 0.89 12/19/10 0.95 1.16 0.91 12/20/10 0.94 1.28 0.90 Exhibit 3-H Date 12/21/10 12/22/10 12/23/10 12/24/10 12/25/10 12/26/10 12127/10 12/28/10 12/29/10 12/30110 Oil 0.94 0.94 0.94 0.95 0.95 0.95 0.95 0.95 0.93 0.96 2010 Facility Allocation Factors Milne Point Unit Water 1.19 1.24 1.24 1.27 1.23 1.24 1.24 1.27 1.27 1.25 Gas 0.88 0.89 0.92 0.92 0.93 0.90 0.91 0.90 0.91 0.91 12/31/10 0.97 1.23 0.91 Mean 0.92 1.15 0.80 Standard 0.091 0.169 0.100 Deviation �7 Section 4 Sag River Oil Pool List of Exhibits Waterflood Pattern Map 4-A Total Reservoir Production Plot 4-B Total Reservoir Injection Plot 4-C Pertinent Data Summary 4-1) Reservoir Voidage Balance 4-E Static Pressure Data 4-F Injection Rate & Pressure Data By Well 4-G Sag River Oil Pool Waterflood Project Summary The Sag River waterflood area is shown in Exhibit 4-A. The locations of production and injection well pairings are shown to give a general visualization of waterflood polygons, but do not show estimated waterflood sweep. A Participating Area for the Sag was approved in 2005. On December 31, 2008, the PA contracted to a 160 acre area around the active wells, MPF -33A and MPF -73A. The locations of the active production and injection wells are shown with the waterflood pattern specifically identified. During 2010, there were three active Sag production wells (MPF -33A, MPK-33, and MPC -23) and one active injection well (MPF -73A). Exhibit 4-B shows a production plot for the Sag River reservoir covering the entire history through December 2010. There was no production from the reservoir in most of 1999 and the entire year of 2000 because it was not economical to repair the failed ESPs. At the end of 2000, one well (MPC -23) was converted to a jet pump completion. In 2001, one well (MPF -33A) was side-tracked and completed with a jet pump completion and another well (MPF -73A) was deepened from an idle Kuparuk well into the Sag River reservoir as an injector. One producing well (MPC -23) was shut in for integrity reasons in 2002 and the injection well (MPF -73A) was changed to water service only in 2006 due to tubing to inner annulus communication on gas injection. The Sag River Oil Pool oil production averaged 622 STBD, gas production averaged 793 MSCFD, and water production averaged 419 STBD in 2010. Cumulative production through the end of 2010 is 2.27 MMSTB of oil, 2.32 BSCF of gas, and 2.00 MMSTB of water. In 2010, the average water cut was 40.3% which is a slight increase over the 2009 average water cut of 37.8%. In 2010, the average GOR was 1276 SCF/STB, which is an increase from the 2009 average GOR of 617 SCF/STB. The GOR increase is due to the MPC -23 returning to production at the end of 2009 and producing throughout 2010 at a higher GOR than the other production well, MPF -33A. Exhibit 4-C shows an injection plot for the Sag River reservoir through December 2010. The only injector (MPF -73A) started water injection in July 2002. The water injection rate for 2010 averaged 947 BWD, with no gas injected. Cumulative water injection since waterflood startup through the end of 2010 is 2.37 MMSTB and cumulative gas injection for the same period is 0.32 BSCF. Both MPF -33A, MPC -23, and MPF -73A were online for the majority of 2010. MPK-33 only produced for four days in November 2010 before it was shut due to cross-flow; the well is currently waiting for a rig work over. Exhibit 4-D presents a summary of the pertinent production information for the Sag River Oil Pool. Exhibit 4-E shows a monthly breakdown of production and injection data for the report period. Exhibit 4-F presents the reservoir pressure data for the Sag River wells taken during 2010. Exhibit 4-G provides a monthly summary of the injection rate and injection pressure data for the Sag River Oil Pool injector. by BP Alaska Exhibit 4-A 0 Area Map - Sag River Formation, Milne Point Field, 2010 Well Status: • Producer online • Producer shut in �Nj ♦ Injector online Milne Point Sag River PA - Milne Point Unit Boundary 1 0 1 2 m 1 i— 1• 1 1 i 1 1 • MP: -33 10000 Exhibit 4-13 BP ALASKA - Milne Point Unit SAG Reservoir, Total Production 10000 Q 0 U. V 1000 LL U N C 0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 -Ili 4 Ja-4— i I E t i -- ! i 10 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 Oil Prod Cum SAG Oil Prod Rate SAG Water Prod Cum SAG 0 Water Prod Rate SAG Gas Prod Rate SAG —Gas Prod Cum SAG —#— Producers OnLine --f— Wtr Cut % —X Gas/Oil Ratio SAG 4.5 4.0 3.5 3.0 0 2:5 c a 2.0 0 1.5 1.0 0.5 0.0 2010 prod uction_injection.xls 3/17/2011 4510 4010 Q 3510 G m 3010 m m N 2510 co 2010 1510 m 1010 2 510 10 02 03 04 05 06 07 08 09 10 11 Exhibit 4-C BP ALASKA - Milne Point Unit SAG Reservoir, Injection 10000 O LL 1000 N 10 Water Inj Cum SAG Water Inj Rate SAG —Gas Inj Cum SAG — X Gas Inj Rate SAG lk 0 02 03 04 05 06 07 08 09 10 11 • Water Injector Online Gas Injector Online 2010 production_injection.xls 3/17/2011 Exhibit 4-D Milne Point Unit - Sag River Oil Pool SUMMARY OF PERTINENT DATA As of December 31, 2010 WATERFLOOD START-UP DATE: July 1, 2002 Prior to Waterflood Start -Up: Oil (MSTB) 1,299 Gas (MMSCF) 1,302 Water (MSTB) 1,481 Since Waterflood Start -Up: Oil (MSTB) 966 Gas (MMSCF) 1,015 Water (MSTB) 527 FLUID INJECTION Since Waterflood Startup: Injection Water (MSTB) 2,368 Injection Gas (MMSCF) 324 AVERAGE OF PRESSURES OBTAINED IN 2010 018,700' TVD ss December, 2010 Pressure (psig) 3,172 WELL COUNT (Wells in Operation)* Production Wells 3 WAG Injection 0 Water Only Injection 1 Gas Only Injection 0 Notes: * Reflects ONLY operating wells. Exhibit 4-E RESERVOIR VOIDAGE BALANCE Milne Point Unit Sag River Oil Pool January - December 2010 Production: Injection: Oil Water Gas Reservoir Water Gas Voidage Voidage Voidage Month Prod Rate Prod Rate Prod Rate Voidage Inj Rate Inj Rate Replacement Replacement Balance (stb/day) (stb/day) (mscf/day) (rbbl/day) (stb/day) (mscf/day) (rbbl/day) Ratio (rbbl/day) 1/31/2010 866.0 5036 1040.8 2,166 1013.7 0 1,034 0.48 -1,132 2/28/2010 847.6 406.2 1057.8 2,064 923.1 0 942 0.46 -1,122 3/31/2010 653.2 113.3 914,7 1,471 961.6 0 981 -- -490 4/30/2010 7338 793.4 1000.4 2,309 1030.8 0 1,051 -- -1,257 5/31/2010 561 0 2884 6965 1,383 1060.2 0 1,081 0.78 -302 6/30/2010 499.4 2197 552.0 1,136 6174 0 630 0.55 -506 7/31/2010 5097 291.8 556.9 1,223 919.7 0 938 0.00 -285 8/31/2010 6008 303.2 7772 1,502 1006.2 0 1,026 0.00 -475 9/30/2010 633.6 3144 868.8 1,620 10315 0 1,052 0.65 -568 10/31/2010 483.4 3094 6271 1,277 1023.1 0 1,044 0.82 -233 11/30/2010 623.4 3091 916.3 1,645 920-8 0 939 0.00 -706 12/31/2010 448.9 1180-1 510.1 2,035 861.7 0 879 0.43 -1,156 ,Average: 2010 622 419 793 1,652 947 0 966 0.58 -686 Cumulative: mstb mstb mmscf mrb mstb mmscf mrb mrb 31 -Dec -10 2,265 2,008 2,317 6,027 2,368 324 2,689 045 -3,338 Page 1 Exhibit Statir Ire Data S Oil Pool FL STATL it: ALASKA PBU Pressure Build Up ALASKA OIL AND GAS CONSERVATION COMMISSION Pressure Fall Off PP RESERVOIR PRESSURE REPORT SBHP 1. Operator: BPXA 12. Address: 900 E. Benson Blvd Anchorage, Alaska 99508-4254 3. Unit or Lease Name: Milne Point 4. Feld and Pool: Sag River Oil Pool 5. Datum Reference: 6750' SS 6.0il Gravity: API - 34 7. Gas Gravity: Air = .65 a. Well Name 9. API Number 50,W-7f)f)i11X-)CIL-X% f O.Oit (0) or Gas and Number. (G) 11. AOGCC Pool Code 12. Final Test Date 13. Shut -In Time, 14. Press. 15. B.H. Temp. Hours Surv. Type (see instructions for 16. Depth Tool 17. Fnal 16. Datum iV Dss (input) TVDss Observed Pressure at Tool Depth 19. Pressure 20. Pressure at Gradient, Datum (cal) psi)ft. MPC -23 50-00-29226.43.00 PROD 525150 10/18/2010 240 SBHP 8.580.04 2,143 8,750 0.441 2.197 21. All teals reported herein were made in accordance with the applicable rules, regulations and instructions of the Alaska Oil and Gas Conservation Commission. I her That the fo is true and correct to the best of my knowled . Signature Title Printed Name Date FL Fluid Leel PBU Pressure Build Up PFO Pressure Fall Off PP Pump Pressure SBHP Shut -In Bottom Hole Pressure Exhibit 4-G Injection Rate and Pressure Data Milne Point Field Sag River Pool Wellhead Pres Days Inj Vol Alloc Injection Rate Sw Name Month Avg (psi) Operating Product Code (BBL, MCF) (BBL, MCF) MPF -73A 1/1/2010 2,818.70 31 H2O 31,425 1,013.71 MPF -73A 2/1/2010 2,850.90 28 H2O 25,847 923.10714 MPF -73A 3/.1/2010 2,952.20 31 H2O 29,809 961.58065 MPF -73A 4/1/2010 3,074.60 30 H2O 30,923 1,030.77 MPF -73A 5/1/2010 3,115.50 31 H2O 32,866 1,060.19 MPF -73A 6/1/2010 2,975.40 19 H2O 18,522 974.84211 MPF -73A 7/1/2010 2,898.30 31 H2O 28,511 919.70968 MPF -73A 8/1/2010 3,055.60 31 H2O 31,193 1,006.23 MPF -73A 9/1/2010 3,089.60 30 H2O 30,944 1,031.47 MPF -73A 10/1/2010 3,012.10 31 H2O 31,715 1,023.06 MPF -73A 11/1/2010 2,910.30 30 H2O 27,625 920.83333 MPF -73A 12/1/2010 2,844.30 31 H2O 26,712 861.67742 Section 5 Production/Injection Well Surveillance List of Exhibits Milne Point Surveillance 1/1/2010-12/31/2010 5-A Production/Injection Well Surveillance As per Conservation Order 205 (Kuparuk River Oil Pool) and Order 477 (Schrader Bluff Oil Pool), the Milne Point Operator runs injection surveys on at least one third of the existing multiple sand injectors annually and on new multiple sand injectors. There were 27 existing Kuparuk multi -sand injectors in 2010. Ten injection surveys were obtained in 2010. All of the injection surveys were performed in multi -sand injectors. So, surveys were obtained in 10 of the 27 multi -sand injectors. There were 27 existing Schrader Bluff multi -sand injectors in 2010, three of which were shut in all year. So 24 operating Schrader Bluff multi -sand injectors existed in 2010, and nine injection surveys were run in 2010. No injection survey was needed in the Sag River Oil Pool because it is a single zone reservoir. Since the majority of producers at Milne Point are completed with ESPs or jet pumps which preclude logging below the pump while on production, few production logs are run. No production logs were run in Kuparuk wells in 2010. No production logs were run in Schrader Bluff wells in 2010. In place of regular production logs, the Schrader Bluff field has utilized geochemical fingerprinting in the past, to determine production splits from the N, OA, and OB sands. In 2007 the geochemical fingerprinting program for the Schrader Bluff was suspended and will remain inactive until further analysis. Exhibit 5-A is a summary of the Milne Point field well surveillance performed in 2010 on both producers and injectors. Exhibit 5-A Milne Point Unit 2010 Surveillance Kuparuk River Oil Pool Schrader Bluff Oil Pool Sw Name Project Well Type Rec Date Log Type Comments MPE-29 IMilne Schrader In' 6/29/2010 IPROF Splits: 20% OA, 80% OB MPG -07 Milne Schrader In' 7/1/2010 IPROF Splits: 0%NB, 15%OA, 85%OB MPG -09 Milne Schrader Inj 8/14/2010 IPROF S lits: 38% NB. 62% OA MPG -13 Milne Schrader In' 6/27/2010 IPROF Splits: Uninterpretable MPG -19 Milne Schrader In' 8/14/2010 IPROF Splits: Uninterpretable MPH -17 Milne Schrader In' 9/1/2010 IPROF Splits: 65% NB, 6% OA, 33% OB MPJ -15 Milne Schrader In' 7/1/2010 IPROF Splits: Uninterpretable MPJ -19A Milne Schrader Inj 7/1/2010 IPROF Splits: 0% NB, 36% OA, 64% OB MPS -02 Milne Schrader In' 1117/2010 IPROF Splits: 9% NB, 38% OA, 62% OB MPC -42 Milne Kuparuk Inj 8/1312010 1PROF Splits: 23%C1, 57%A3, 20%A2 MPF -91 Milne Kuparuk In' 8/21/2010 (PROF Splits: 48% A3, 52% Al MPL-16A Milne Kuparuk In' 8/21/2010 ]PROF Splits; 11% C, 56%A3, 22%A2, 11%A1 MPL-33 Milne Kuparuk Inj 6/25/2010 IPROF Splits: 66% A. 34% C MPF -95 Milne Ku aruk In' 9/4/2010 IPROF Splits: 59%A3, 23%A2,18% Al MPC -15 Milne Kuparuk In' 9/5/2010 IPROF Splits: 23% A, 20% B. 57% C MPE-03 Milne Kuparuk In' 9/11/2010 IIPROF Splits: Uninterpretable MPC -10 Milne Kuparuk In' 8/14/2010 IPROF Splits: Uninterpretable MPC -28A Milne_Kuparuk Inj B/13/2010 IPROF Splits: Uninterpretable MPC -19 Milne Kuparuk In' 9/6/2010 IPROF Splits: Uninterpretable DED = Dedicated injection into single sand RFT = Repeated Formation Test FSPL = Full Suite Production Log RST = Reservior Saturation Tool GEO = Geochemical Analysis of Production splits SZT = Separate Zone Test IPROF/STP = Spinner, Temperature. Pressure WBL = Warmback to PDS = Pulsed Decay WFL = Water Flow Lo 0 Section 6 Shut in Well Status List of Exhibits Milne Point Shut in Well Status 1/1/2010 —12/31/2010 6-A MPS -23 I Kuparuk 1 500292191500 1 Jun -01 Exhibit 6-A Reason for Current Mechanical Condition of Well, including Integrity Veil Shutan' Issuesz SW Name Reservoir API Number Oad Sht D Pressure building up slowly. IBP set in well Fab 2006 to secure. E In MPB-01 Prince 500292049000 Sep -01 WW MP' Cnmk 9ge" 500292127600 Ape -11 M Kuparuk 500292132400 Aug -02 M—PB-OF KUPRruk 500292132500 60-94 MPB-111 Kuparuk 500292130300 Apr -07 MPSA71 Kuparuk 500292143400 Apr -98 MPB-19 Kuparuk 500292145100 Jul -91 MPS -23 I Kuparuk 1 500292191500 1 Jun -01 Milne Point U n I I lure Utility Comments Plana B a 3 Water source well not currently needed. Evaluate replaOng ESP 3 2 HIgh GOR well. Needs permanent flow I!noS installed and gas lift Iles Is bilnded. DLPgnast" dstarmined pu4ntlat source of preswte 3 Further use as an injector not required. Evaluate potential t Need to fix ru6vwt tch and 21ILM F O 3 Wall house and flowlines removed. Quick communication with 3 Well houio and Howllnes removed. GL well. High water cut producer. Possible frac Into water zone. Evaluate potential 1 Evaluatinal conversion In &Creon. 2 Higti GOR well. Facilities normally cannot handle gas. Attempted to 2010 Shut -In Wells Reason for Current Mechanical Condition of Well, including Integrity Veil Shutan' Issuesz E ESP failed D Surface casino Issue D Pressure building up slowly. IBP set in well Fab 2006 to secure. E No known problems D TBG kale well secured wi sand lull E No mechanical problems. B Kuparuk 500292137301 No known problems. C NOknown In Issues. A Noknown well integrity Issues. Would need a TTP pulteo Milne Point U n I I lure Utility Comments Plana B a 3 Water source well not currently needed. Evaluate replaOng ESP 3 2 HIgh GOR well. Needs permanent flow I!noS installed and gas lift Iles Is bilnded. DLPgnast" dstarmined pu4ntlat source of preswte 3 Further use as an injector not required. Evaluate potential t Need to fix ru6vwt tch and 21ILM F O 3 Wall house and flowlines removed. Quick communication with 3 Well houio and Howllnes removed. GL well. High water cut producer. Possible frac Into water zone. Evaluate potential 1 Evaluatinal conversion In &Creon. 2 Higti GOR well. Facilities normally cannot handle gas. Attempted to MPCFP-02i I Kuparuk 1500292125800 I Nov -95 I E I No known mechanical problems MPD -01 Kuparuk 500292066400 Dec -90 C Dead ESP completion downhole, no support to block MPD -02A Kuparuk 500292090001 Aug -99 B Weil secured June -05 wM downhoH plug. Planned to F In h on hold. MPE-021 Kuparuk 1 500292141700 Aug -98 I E No known problems. Well is secured wl downhole plug MPE-33 KUDaWN 9007 n a u a, ow. ,.... 3 .. .. FurteruseasanlnjectornoSrequlradwhilenooTFsotpr0ducors MPC -11i Kuparuk 500292132100 Apr -95 E Nowellhouse,noflowlines 500292262300 line, MPC-12Ai Kuparuk 500292137301 Sep -95 D Weil suspended 113(93. Secured with CIBP and FP with 4 Wollbara lost during coiled tubing sid0lrar:k. MPC -16 Kuparuk 500292136400 May -92 A Weil suspended 10127(93. Puled comp}eti0116 and Be 2 4 Hlgh GOR from E-03 gas breakthrough. MPC -171 Ku 500292147300 0 ,MPF -80 n El wilfi Hers Leak M 9 5fa' to surface 6 3 e n out nand to acti High water cul. PerPd without good logs. Wellhouse and Rowllnea MPC -20 Kuparuk 500292191400 Oct -92 B No wellhouse, no flow lines E WSID MPI -15 Schrader 500292279600 Apr -09 A Working ESP 3 Shut in well due to rapldlhlgh gas broakthrougn In C-07 and C-21. MPC-25Ai Kuparuk 500292263601 Dec -03 E No known problems 500292219800 Possible Kuoaruk4S. f MPCFP-02i I Kuparuk 1500292125800 I Nov -95 I E I No known mechanical problems MPD -01 Kuparuk 500292066400 Dec -90 C Dead ESP completion downhole, no support to block MPD -02A Kuparuk 500292090001 Aug -99 B Weil secured June -05 wM downhoH plug. Planned to F In h on hold. MPE-021 Kuparuk 1 500292141700 Aug -98 I E No known problems. Well is secured wl downhole plug MPE-33 Schrader 500292289800 Oct -99 C ESP failed; no surface casing and liner has no cement M' K 500292267900 1 Apr49 E Ica Ptucl M Kuparuk 500292262300 Dec -05 D Tubing integrity problem MAF -41i Kuparuk 500292277000 Oct -04 E No known problems. ESP still functional. MPH -04 9chrsdw 5wz=QGUG J C No known problems MPF -741F= K L SOM22SUOF May -06 C I injector,/rcaan hdM no other In ,MPF -80 Kuparuk 500292292800 Jun -09 E 20 2011 Well plugged :MPF -021 Kuparuk 500292297100 Jan -03 E INo known mechanical problems MPG -12 Schrader 500292279200 1 Jul -01 C IESP failed MPH -01 Schrader 500292206100 Oct -98 C iESP failed MPH -02 Ugnu 500292205200 Nov -01 A No known problems. Has a temp drive for ESP MPH -03 Schrader 500292206300 Aug -91 C No known problems. ESP still functional. MPH -04 9chrsdw 5wz=QGUG J C Failed ESP MPH -09 Schrader 500292280400 May -06 D Hole in casing at 311' W144-14 Schrader W292XVloo A r.06 C ESP raw MPI -01 Schrader 500292205500 Dec -98 C ESP failed MPI -15 Schrader 500292279600 Apr -09 A Working ESP MPJ -04 Schrader 500292207300 Oct -09 C ESP failed MPJ -07 Schrader 500292219800 Sep -03 C ESP failed :MPJ -09A Schrader 500292249501 Sep -08 D IESP failed MPJ -12 Kuparuk 500292250600 Jul -98 C ESP failed MPJ -161 Kuparuk 50 02922 61 500 Jan -99 E No known problems MPK-18Ai Kuparuk 500292273301 I Dec -08 E Corrasion from source water MPK-21Ai Kuparuk 500292271601 Dec -08 E Corro6oft from source water Mr Kuparuk 500292324900 Dec -08 E Corrosion from source water Mw UGNU 500292271200 Dec -08 E Corrosion from source water MPK-38 Kuparuk 500292264900 Apr -09 D Needs RWO to replace failed ESP MPK-43A Kuparuk 500292273801 Sep -08 E Corrosion from source water MPL-01A Kuparuk 500292106801 Jan -07 0 ESP failed. 3 Thiel zone dlroclly to offset producers. Evaluate Sagl5chrader 3 No support to block. No how lines from D pad. PEan to PBA in the 5 High water cut well. No fiowlnes from D pad. Plan to PBA In the 3 No surface facgit es. Injector drlued tight Into a fault. Would rags 3 Wallhouso and llowlines removed. Possibleconver3ion to injectte i Hqh utility future Intervention. 2 RWO needed to replace tubing. Requires new selsmic to Irf 1 Ddlled as a producer. High water saturation so convened to injection. No response soon In offset producer. Evaluate potential 2 Lew valva 14wtor_RqWTatum to n 1 H 201 5 (Plan to abandon the well 1 I 102010 Sidetrack plan nod 1 No surface cog. I Well house has bean removed 1 Oil sample retrieved during 2006 but no production to plant 2 Redevolopment under ovalualien for 2010 3 ! hodran 1 WH and flow lines removed In '98 1 Hlgh GOR, needs addittonal Injection in block 1 Low flow, considering for sidotrach 1 19 516 surface cog. 7: prod lnor. 3 High sand produc0on. 1 Evaluate potongal sidetrack to SchradOt targets. 1 No surface facilities. Evalu ste potential Schrader side trark. 1 intorvention under evaluation for 2011 S IntarvenVonunder evalualIonfor 2011 1 Intervention underevaluatidn for 2011 1 W atar Source Well 1 Uneconomic RWO to replace ESP. Evaluating sidetrack options. 1 Intervention un der ovaluati on for 2010 1 In tervention u ader evaluation for 2010 MI.. o..i..f i We Minh GOR, currently uncompetitive to Produce due to facplty cantralnb. no (mown mechanical problems High water, currently uneconomic to produce. no (mown mechanical problems Low production rate, no (mown mechanical problems Mschanlcak probiame "or (SPeCIN under COMMI IMI I Machanlcai Condition deecribs the current mechanical condition Including the condition of Installed tuhklp and cashm stomp. FUtUre UUM 1. Evolustkm remodel, sidetrack andlor reddtl opportunities 1. Rennsdlel well work planned ]. LCnp farm Shut -In w4lUNo Imrnedlate Mane 4. Suspended well 3. P" planned 6. Other ISpectiv under comments) Note - Wells were shut in 100% In 2010 7 Section 7 Milne Point Well Testing and ASRC Unit 5 Summary List of Exhibits Well Test Frequency 7-A Milne Point Well Testing Milne Point primarily utilizes on -pad separators for well testing. The pad separators at B, C, E, F, H, K and L pads employ volumetric vessel -based gas-liquid separation; separators at I, J and S pad employ centrifugal separation while the separator at G -pad is a multiphase meter aka Alpha "VSRD" (Venturi, Sonar, Red Eye, and Densitometer). Thus, a variety of metering technologies are employed across Milne Point including: - Turbine positive -displacement, MicroMotion coriolis meters or Venturi/Sonar meters for liquid flow rate - Phase Dynamics watercut meters on the separator liquid legs or Red Eye Meter for water rate - Turbine, MicroMotion coriolis meters or densitometers for gas flow rate Wells are automatically routed into test on a rolling schedule, such that a well is always being tested on every pad with in-place testing facilities. Test duration is at least 6 hours, plus the necessary purge time to flush the lines and vessel. The services of a portable test separators, provided by contractor ASRC, are utilized on an ad- hoc basis whenever there are concerns about individual pad separators or to verify readings form the fixed pad separators. As part of the growing efforts to improve confidence in test separation systems across BP operations on the North Slope, Milne Point is also employing the use of new types of multi -phase meters, as well as proper use of chemical additives such as emulsion breaker. At Milne Point, a Weatherford multiphase meter, aka Alpha VSRD (Venturi, Sonar, Red Eye, Densitometer) was installed at G -pad in December, 2009, and a new Alpha VSRD was purchased and delivered a year later in December, 2010, for installation at MPS -pad. Exhibit 7-A provides information on the well tests conducted for consideration in production allocation during 2010. ASRC Unit #5 Operational and Performance Issues ASRC Unit 5 is a portable well test unit that uses FMC Technologies Enhanced Multiphase System (EMS) to measure well production. The EMS is comprised of a venturi meter and capacitance and conductance electrodes coupled with a cyclonic pre -separator allowing partial separation and metering in high gas volume fraction wells. The unit was used at the Milne Point Field throughout 2008 under temporary AOGCC approval and approved for permanent use at Milne Point on December 30, 2008. ASRC Unit 5 underwent a trial period in early 2008 where piggyback testing was conducted with an established gravity test separator, ASRC Unit 1. The resulting test data from Unit 5 was compared to Unit 1 tests, manual fluid samples and historic field well tests. In this way, it was determined that Unit 5 measures total liquid volume within f 10% and water cut with an uncertainty band of f2.5 to 5%. Following the trial period, Unit 5 was accepted as a full time portable test separator at Milne Point, and it began autonomous testing across the field. Work is ongoing with ASRC to continue to improve the accuracy of Unit 5 with a focus on metering gross fluid rates, water cuts and gas volumes. Exhibit 3-H (Schrader Bluff Oil Pool) provides daily oil, gas, and water allocation factors for the Milne Point Facility for 2010. Exhibit 7-A 2010 Well Testing Milne Point Unit 2010 Field total all KUP all SBF all SAG all Average Tests / Month 6.2 6.1 6.5 2.7 Reservoir Pad Formation KUP B 10.3 KUP C 9.1 KUP E 8.3 KUP F 3.6 KUP H 6.8 KUP J 4.9 KUP K 11.6 KUP L 3.8 SBF C 0.0 SBF E 7.9 SBF G 10.7 SBF H 5.3 SBF 1 7.5 SBF J 5.0 SBF S 4.8 SAG F 2.7 * Average Tests / Month calculated as total number of tests divided by (days operating divided by 30.4 days per month). Pad Well Formation Required Tests/ Month Days On Prod. Total Tests Average Tests 1 Month MPB MPB-03 KUP 1 321 110 10.4 MPB MPB-04A KUP 1 341 115 10.3 MPB MPB-06 KUP 1 0 0 0.0 MPB MPB-09 KUP 1 339 136 12.2 MPB MPB-10 KUP 1 330 129 11.9 MPB MPB-15 KUP 1 327 109 10.1 MPB MPB-16 KUP 1 320 86 8.2 MPB MPB-20 KUP 1 0 0 0.0 MPB MPB-21 KUP 1 338 100 9.0 MPB MPB-22A KUP 1 344 120 10.6 MPC MPC -01 KUP 1 342 103 9.2 MPC MPC -03 KUP 1 346 108 9.5 MPC MPC -04 KUP 1 324 94 8.8 MPC MPC -05A KUP 1 341 104 9.3 MPC MPC -07 KUP 1 r 330 110 10.1 MPC MPC -09 KUP 1 0 0 0.0 MPC MPC -13 KUP 1 348 98 8.6 Exhibit 7-A 2010 Well Testing Milne Point Unit MPC MPC -14 KUP 1 356 104 8.9 MPC MPC -21 KUP 1 351 102 8.8 MPC MPC -22A KUP 1 314 109 10.6 MPC MPC -24A KUP 1 131 38 8.8 MPC MPC -26 KUP 1 342 89 7.9 MPC MPC -40 KUP 1 153 37 7.4 MPC MPC -41 SBF 2 0 0 0.0 MPC MPC -43 KUP 1 352 104 9.0 MPE MPE-04 KUP 1 358 104 8.83 MPE MPE-06 KUP 1 283 71 7.64 MPE MPE-08 KUP 1 214 58 8.26 MPE MPE-09 KUP 1 333 86 7.86 MPE MPE-10 KUP 1 358 97 8.25 MPE MPE-11 KUP 1 181 55 9.23 MPE MPE-14A KUP 1 342 102 9.07 MPE MPE-15 SBF 2 0 0 0.00 MPE MPE-18 KUP 1 0 0 0.00 MPE MPE-19 KUP 1 178 38 6.49 MPE MPE-20A SBF 2 249 71 8.69 MPE MPE-22 KUP 1 331 89 8.18 MPE MPE-24A SBF 2 355 99 8.48 MPE MPE-28 SBF 2 222 58 7.94 MPE MPE-30A SBF 2 163 35 6.52 MPE MPE-31 SBF 2 298 71 7.25 MPE MPE-32 SBF 2 355 95 8.14 MPF MPF -01 KUP 1 347 50 4.4 MPF MPF -05 KUP 1 350 50 4.3 MPF MPF -06 KUP 1 346 42 3.7 MPF MPF -09 KUP 1 348 44 3.9 MPF MPF -13 KUP 1 235 26 3.4 MPF MPF -14 KUP 1 350 40 3.5 MPF MPF -18 KUP 1 349 40 3.5 MPF MPF -22 KUP 1 348 40 3.5 MPF MPF -25 KUP 1 309 35 3.4 MPF MPF -29 KUP 1 272 37 4.1 MPF MPF -33A SAG 2 335 30 2.7 MPF MPF -34 KUP 1 323 42 4.0 MPF MPF -37 KUP 1 350 40 3.5 MPF MPF -38 KUP 1 353 42 3.6 MPF MPF -45 KUP 1 349 41 3.6 MPF MPF -50 KUP 1 323 37 3.5 MPF MPF -53 KUP 1 343 38 3.4 MPF MPF -54 KUP 1 349 39 3.4 MPF MPF -57A KUP 1 109 9 2.5 MPF MPF -61 KUP 1 302 38 3.8 MPF MPF -65 KUP 1 327 41 3.8 MPF MPF -66A KUP 1 349 46 4.0 MPF MPF -69 KUP 1 250 34 4.1 MPF MPF -78 KUP 1 348 39 3.4 MPF MPF -79 KUP 1 351 41 3.6 Exhibit 7-A 2010 Well Testing Milne Point Unit MPF MPF -80 KUP 1 0 0 0.0 MPF MPF -81 KUP 1 291 31 3.2 MPF MPF -86 KUP 1 249 27 3.3 MPF MPF -87A KUP 1 349 41 3.6 MPF MPF -93 KUP 1 281 32 3.5 MPF MPF -94 KUP 1 223 24 3.3 MPG MPG -02 SBF 2 358 134 11.4 MPG MPG -08A SBF 2 0 0 0.0 MPG MPG -14 SBF 2 355 122 10.5 MPG MPG -15 SBF 2 258 84 9.9 MPG MPG -16 SBF 2 341 120 10.7 MPG MPG -18 SBF 2 354 124 10.7 MPH MPH -04 SBF 2 0 0 0.0 MPH MPH -05 KUP 1 350 78 6.8 MPH MPH -07A SBF 2 74 14 5.7 MPH MPH -08B SBF 2 354 65 5.6 MPH MPH -09 SBF 2 0 0 0.0 MPH MPH -10 SBF 2 180 31 5.2 MPH MPH -13A SBF 2 355 72 6.2 MPH MPH -14 SBF 2 0 0 0.0 MPH MPH -16 SBF 2 356 62 5.3 MPH MPH -18 SBF 2 341 52 4.6 MPH MPH -19 SBF 2 88 9 3.1 MPI MPI -03 SBF 2 356 102 8.7 MPI MPI -04A SBF 2 361 85 7.2 MPI MPI -06 SBF 2 9 2 7.1 MPI MPI -12 SBF 2 149 15 3.1 MPI MPI -14 SBF 2 354 100 8.6 MPI MPI -15 SBF 2 0 0 0.0 MPI MPI -17 SBF 2 357 85 7.2 MPI MPI -19 SBF 2 342 74 6.6 MPJ MPJ -01A SBF 2 226 47 6.3 MPJ MPJ -03 SBF 2 359 70 5.9 MPJ MPJ -04 SBF 2 0 0 0.0 MPJ MPJ -05 SBF 2 240 36 4.6 MPJ MPJ -06 KUP 1 356 60 5.1 MPJ MPJ -08A SBF 2 353 61 5.3 MPJ MPJ -09A SBF 2 0 0 0.0 MPJ MPJ -10 KUP 1 223 34 4.6 MPJ MPJ -19A SBF 2 0 0 0.0 MPJ MPJ -23 SBF 2 100 6 1.8 MPJ MPJ -24 SBF 2 0 0 0.0 MPJ MPJ -25 SBF 2 346 49 4.3 MPJ MPJ -26 SBF 2 329 56 5.2 MPK MPK-02 KUP 1 278 113 12.4 MPK MPK-05 KUP 1 350 142 12.3 MPK MPK-06 KUP 1 7 0 0.0 Exhibit 7-A 2010 Well Testing Milne Point Unit MPK MPK-09 KUP 1 27 0 0.0 MPK MPK-13 KUP 1 333 118 10.8 MPK MPK-17 KUP 1 7 0 0.0 MPK MPK-30 KUP 1 126 57 13.8 MPK MPK-33 KUP 1 6 1 5.1 MPK MPK-37 KUP 1 0 0 0.0 MPK MPK-38 KUP 1 0 0 0.0 MPL MPL-01A KUP 1 0 0 0.0 MPL MPL-02A KUP 1 282 38 4.1 MPL MPL-03 KUP 1 267 35 4.0 MPL MPL-04 KUP 1 352 51 4.4 MPL MPL-05 KUP 1 350 46 4.0 MPL MPL-06 KUP 1 345 44 3.9 MPL MPL-07 KUP 1 345 56 4.9 MPL MPLA1 KUP 1 350 51 4.4 MPL MPL-12 KUP 1 210 24 3.5 MPL MPL-13 KUP 1 348 44 3.8 MPL MPL-14 KUP 1 348 35 3.1 MPL MPL-20 KUP 1 299 31 3.1 MPL MPL-25 KUP 1 345 40 3.5 MPL MPL-28A KUP 1 348 46 4.0 MPL MPL-29 KUP 1 346 39 3.4 MPL MPL-36 KUP 1 279 34 3.7 MPL MPL-40 KUP 1 353 38 3.3 MPL MPL-43 KUP 1 324 36 3.4 MPS MPS -01A SBF 2 110 3 0.8 MPS MPS -03 SBF 2 174 33 5.8 MPS MPS -04 SBF 2 197 23 3.6 MPS MPS -05 SBF 2 56 6 3.3 MPS MPS -08 SBF 2 268 60 6.8 MPS MPS -12 SBF 2 317 67 6.4 MPS MPS -17 SBF 2 224 39 5.3 MPS MPS -19A SBF 2 349 50 4.4 MPS MPS -23 SBF 2 315 28 2.7 MPS MPS -24 SBF 2 339 69 6.2 MPS MPS -25 SBF 2 298 17 1.7 MPS MPS -27 SBF 2 0 0 0.0 MPS MPS -28 SBF 2 356 82 7.0 MPS MPS -29 SBF 2 222 26 3.6 MPS MPS -32 SBF 2 350 60 5.2 MPS MPS -34 SBF 2 248 36 4.4 MPS MPS -35 SBF 2 349 66 5.8