Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2012 Colville River Unit 2012 Annual Reservoir Surveillance Report, Colville River Unit: Alpine Oil Pool 2012 Reservoir Review Report, Colville River Unit: Nanuq, Fiord and Qannik Oil Pools Form 10-412 for Alpine, Nanuq, Fiord and Qannik Form 10-413 for Alpine, Nanuq, Fiord and Qannik Surface Safety Valve Testing 2012 March 29, 2013 ii Table of Contents: Alpine Oil Pool Annual Reservoir Surveillance ..................................................................... 1 Nanuq Oil Pool Annual Reservoir Review .............................................................................. 3 Fiord Oil Pool Annual Reservoir Review ................................................................................ 5 Qannik Oil Pool Annual Reservoir Review. ............................................................................ 7 Attachment 1: Colville River Unit Map ................................................................................... 9 Attachment 2: Reservoir Pressure Maps at Datum ..............................................................10 Attachment 3: 10-412 Pressure Survey Results by Pool .....................................................14 Attachment 4: 10-413 Report of Injection Project by Pool ..................................................29 Attachment 5: Surface Safety Valve Results 2012 ...............................................................34 2012 CRU Reservoir Surveillance Report 1 Alpine Oil Pool Annual Reservoir Surveillance ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the Colville River Unit (CRU), submits this Alpine Annual Reservoir Surveillance Report as required for the Alpine Oil Pool Conservation Order 443B, Rule 8. Effective March 26, 2009, the Alaska Oil and Gas Conservation Commission (AOGCC) amended the Alpine pool rules to include the Kuparuk zone in the Alpine Oil Pool within the Alpine geologic zone. These AOGCC orders address pressure communication between the Alpine and Kuparuk zones. The AOGCC also terminated the Nanuq-Kuparuk Oil Pool and expanded the area of the Alpine Oil Pool to cover the extents. For this report the Alpine and Nanuq-Kuparuk pools are combined and are discussed as the Alpine Oil Pool. Attachment 1 illustrates the current Colville River Unit boundary and the surface facility pad locations with current participating area agreements. A: Progress of Recovery Projects, Alpine Status Update 140 development wells have been drilled in the Alpine pool to date, 131 in the Alpine reservoir (65 producers, 62 injectors, 3 disposal wells, and 1 data acquisition well) and 9 in the Nanuq Kuparuk formation (4 producers, 5 injectors). Reservoir management of the Alpine PA in 2013 will attempt to maximize oil rate while continuing to gather strategic data associated with peripheral development opportunities. Activities supporting this effort will include: (1) Targeting a pattern level injection/withdrawal ratio of one, (2) managing MWAG injection to maximize recovery, (3) updating and ranking workover and peripheral development opportunities for optimum drilling rig utilization, and (4) identifying well stimulation candidates. These activities are expected to partially offset existing field decline. The following is a summary of the status at Alpine Pool as of January 1, 2013. Alpine Oil Pool 2012 Metrics Daily Ave. Rate Cumulative Volume Oil Production 47.6 MBOPD 387.2 MMSTBO Gas Production 57.1 MMSCFD 464.2 BSCF Water Production 47.4 MBWPD 79.4 MMSTBW Enriched Gas Injection 37.1 MMSCFD 398.7 BSCF Water Injection 107.5 MBWPD 478.8 MMSTB 2012 CRU Reservoir Surveillance Report 2 B: Voidage Balance Alpine Pool 2012 Voidage Balance Month Cumulative Injection / Withdrawal Ratio RVB/RVB Injection / Withdrawal Rate RVB/RVB January 1.02 1.10 February 1.02 1.02 March 1.02 1.06 April 1.02 1.15 May 1.03 1.06 June 1.03 1.12 July 1.03 1.37 August 1.03 1.01 September 1.03 0.94 October 1.02 0.78 November 1.02 0.79 December 1.02 0.97 C: Results and Analysis of Production and Injection Log Surveys, Temperature, Tracer Surveys, Observation Well Surveys and Special Monitoring A pressure survey map is presented in Attachment 2. The 10-412 report of reservoir pressure is Attachment 3. The Alpine reservoir is continuously managed to maintain pattern pressures at the level required for stable production and optimum EOR performance. Several static pressure surveys were conducted on Alpine wells during the course of operations in 2012. Downhole pressure gauges are installed in 8 Alpine production wells. The gauges provide information about flood response and demonstrate reservoir pressure during shut-in events. Reservoir pressures are also estimated from the Alpine full field simulation model as well as from inflow performance analyses. Both approaches are calibrated with actual reservoir pressure measurements collected from static surveys. D: Future Development Plans Alpine drilling prospects exist at CD1, CD2 and CD4. A few peripheral development opportunities still exist in the Alpine, principally in the Alpine C sand. 2013 planned developments include targets in the southwest (which would be primarily developed from CD4) and the east (which would be developed from CD1). CD1-49 and CD4-213B objective is to provide support to the Alpine C sand in the south flank and west flank respectively. CD4-25S producer is going to be the most southwestern well drilled in the Alpine field and is a further delineation of the area. CD3-320 is a Fiord-Kuparuk producer that will be drilled to reach the Alpine level and verify the extent of the reservoir to the far northeast corner. Additionally, other Alpine peripheral step out wells may be drilled in 2013 depending on rig availability. 2012 CRU Reservoir Surveillance Report 3 Nanuq Oil Pool Annual Reservoir Review ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the Colville River Unit (CRU), submits this Nanuq Oil Pool Annual Reservoir Review as required for the Nanuq Oil Pool Conservation Order 562 Rule #10. A: Nanuq Oil Pool Reservoir Pressure Map Please see Attachment 2 for the 2012 reservoir pressure map. B: Summary and Analysis of Reservoir Pressure Surveys Please see Attachment 3 for the 10-412 report of reservoir pressures. C: Estimates of Reservoir Pressure Reservoir pressure is estimated to be approximately 2760 psi at a datum of 6150 ft subsea. D: Results and Analysis of Production and Injection Log Surveys, Temperature, Tracer Surveys, Observation Well Surveys and Special Monitoring Waterflood response has been observed in Nanuq-Nanuq patterns. E: Estimates of Yearly Production and Reservoir Voidage Balance Nanuq Oil Pool 2012 Metrics Daily Ave. Rate Cumulative Volume Oil Production 1.0 MBOPD 1.5 MMSTBO Gas Production 1.5 MMSCFD 2.4 BSCF Water Production 86 BWPD 244 MSTBW Enriched Gas Injection 0 MMSCFD 0 BSCF Water Injection 2.5 MBWPD 3.7 MMSTB Nanuq Oil Pool 2012 Voidage Balance Month Cumulative Injection / Withdrawal Ratio RVB/RVB Injection / Withdrawal Rate RVB/RVB January 1.06 1.58 February 1.07 1.48 March 1.10 2.61 April 1.11 1.76 May 1.12 1.70 June 1.13 1.65 July 1.14 1.70 August 1.13 0.78 September 1.13 1.29 October 1.13 0.92 November 1.12 0.73 December 1.12 0.82 2012 CRU Reservoir Surveillance Report 4 F: Progress of Plans and Tests to Expand the Productive Limits of the Pool The Nanuq Pool has been developed from CD4. There are currently three active producers and two active injectors in the pool. Current plans are to continue to develop the Nanuq reservoir in 2013. Additional drilling activity will occur in the original development area. G: Results of Surface Safety Valve Testing All surface safety valves tests performed in 2012 are listed in Attachment 5. 2012 CRU Reservoir Surveillance Report 5 Fiord Oil Pool Annual Reservoir Review ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the Colville River Unit (CRU), submits this Fiord Oil Pool Annual Reservoir Review as required for the Fiord Oil Pool Conservation Order 569 Rule #9. The Fiord Oil Pool is made up of two participating areas covering two sands: the Fiord-Nechelik and the Fiord-Kuparuk. A: Fiord Oil Pool Reservoir Pressure Map Please see Attachment 2 for the 2012 Reservoir Pressure map. B: Summary and Analysis of Reservoir Pressure Surveys Please see Attachment 3 for the 10-412 report of reservoir pressures. C: Estimates of Reservoir Pressure Average reservoir pressure in the Fiord oil pool is 3300 psi. D: Results and Analysis of Production and Injection Log Surveys, Temperature, Tracer Surveys, Observation Well Surveys and Special Monitoring Downhole pressure gauges are installed in two Fiord production wells. The gauges provide information about flood response and demonstrate reservoir pressure during shut-in events. E: Estimates of 2012 Production and Reservoir Voidage Balance Fiord Oil Pool 2012 Metrics Daily Ave. Rate Cumulative Volume Oil Production 20.1 MBOPD 47.0 MMSTBO Gas Production 17.5 MMSCFD 37.2 BSCF Water Production 10.3 MBWPD 14.3 MMSTBW Enriched Gas Injection 23.3 MMSCFD 26.1 BSCF Water Injection 31.6 MBWPD 54.5 MMSTB Fiord Pool 2012 Voidage Balance Month Cumulative Injection / Withdrawal Ratio RVB/RVB Injection / Withdrawal Rate RVB/RVB January 1.03 1.17 February 1.03 0.89 March 1.03 1.04 April 1.03 1.02 May 1.03 1.18 June 1.03 1.21 July 1.04 1.42 August 1.04 1.14 September 1.04 1.20 October 1.05 1.38 November 1.05 1.24 December 1.05 1.07 F: Progress of Plans and Tests to Expand the Productive Limits of the Pool There are currently 21 wells drilled in the Fiord Nechelik PA, 11 producers and 10 injectors. Six wells have been drilled in the in the Fiord Kuparuk PA, 3 producers and 3 injectors. The Fiord 2012 CRU Reservoir Surveillance Report 6 Nechelik plan of development includes four wells to be drilled from 2013-2015. The Fiord- Kuparuk plan of development includes two potential wells. Development plans within both Fiord reservoirs continues to be an MWAG flood primarily via line-drive horizontal well patterns and a few slant wells in the Fiord Kuparuk. Excellent voidage replacement continues in the Fiord reservoirs, with the current voidage replacement ratio significantly above unity. G: Results of Surface Safety Valve Testing All surface safety valves tests performed in 2012 are listed in Attachment 5. 2012 CRU Reservoir Surveillance Report 7 Qannik Oil Pool Annual Reservoir Review. ConocoPhillips Alaska, Inc., (CPAI) as Operator on behalf of the working interest owners of the Colville River Unit (CRU), submits this Qannik Oil Pool Annual Reservoir Review as required for the Qannik Oil Pool Conservation Order 605 Rule #9. 1: Reservoir Voidage Balance and Cumulative Status There are currently 9 active development wells drilled in the Qannik Oil Pool, 6 producers and 3 injectors. Qannik Oil Pool 2012 Metrics Daily Ave. Rate Cumulative Volume Oil Production 1.8 MBOPD 3.5 MMSTBO Gas Production 0.8 MMSCFD 2.7 BSCF Water Production 70 BWPD 62 MSTBW Enriched Gas Injection 0 MMSCFD 0 BSCF Water Injection 2.1 MBWPD 5.4 MMSTB Qannik Pool 2012 Voidage Balance Month Cumulative Injection / Withdrawal Ratio RVB/RVB Injection / Withdrawal Rate RVB/RVB January 0.98 1.20 February 0.98 1.04 March 0.98 1.03 April 0.98 1.02 May 0.98 1.12 June 0.98 0.95 July 0.98 1.48 August 0.99 0.92 September 0.98 0.65 October 0.98 0.55 November 0.97 0.50 December 0.96 0.50 2: Summary and Analysis of Reservoir Pressure Surveys Qannik had 7 downhole static pressure tests in 2012. This includes 5 static pressure tests which were sheltered by the summer annual turnaround. The pressure results for 2012 were lower than expected. Please see Attachment 2 for the 2012 Reservoir Pressure map. Please see Attachment 3 for 10-412 report of reservoir pressures. 3: Results and Analysis of Production and Injection Log Surveys, Temperature, Tracer Surveys, Observation Well Surveys and Special Monitoring No surveys were performed in Qannik in 2012. 4: Review of Qannik Pool Production Allocation Factors and Issues The WNS Field Production Allocation Factors are used to allocate production within the Qannik Pool. 2012 CRU Reservoir Surveillance Report 8 5: Progress of Enhanced Recovery Projects Waterflood response has been observed in the Qannik reservoir, and flood surveillance is ongoing as pressure maintenance and improved recovery continue. 6. Reservoir Management Summary Cumulative water injection equates to roughly 8% of the hydrocarbon pore volume of the developed portion of the reservoir. As would be expected for such an immature flood, water production remains low at roughly 1% of total liquid production. Water breakthrough is not anticipated until the flood reaches a minimum cumulative injection maturity of 10% HCPVI. Given the high efficiency of injected water in the Qannik flood, injection into the reservoir is maximized by maintaining bottomhole injection pressures as high as possible without exceeding the parting pressure of the cap rock. Work is ongoing to investigate options for increasing injectivity and throughput rates. A reservoir simulation model of the Qannik reservoir covering the developed area and most of the remaining undeveloped acreage has been updated to match performance data through the end of 2012. The model is being used to evaluate options for increasing flood throughput rates and future development potential. 2012 CRU Reservoir Surveillance Report 9 Attachment 1: Colville River Unit Map 2012 CRU Reservoir Surveillance Report 10 Attachment 2: Reservoir Pressure Maps at Datum 2012 CRU Reservoir Surveillance Report 11 2012 CRU Reservoir Surveillance Report 12 2012 CRU Reservoir Surveillance Report 13 2012 CRU Reservoir Surveillance Report Attachment 3: 10-412 Pressure Survey Results by Pool 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)CD1-02 50103203540000 MWAG 120100 ALP 6845.83 - 6816.01 5/15/2012 21486.0 SBHPS 149 6784.62 4737 7000 0.126 4764CD1-02 50103203540000 MWAG 120100 ALP " 6/3/2012 21912.0 SBHPS 143 6778.45 4739 7000 0.126 4767CD1-02 50103203540000 MWAG 120100 ALP " 6/13/2012 22000.0 SBHPS 143 6778.45 4722 7000 0.126 4750CD1-02 50103203540000 MWAG 120100 ALP " 7/13/2012 22902.0 SBHPS 150 6784.62 4639 7000 0.136 4668CD1-02 50103203540000 MWAG 120100 ALP " 8/10/2012 23574.0 SBHPS 150 6784.62 4563 7000 0.136 4592CD1-02 50103203540000 MWAG 120100 ALP " 8/25/2012 23952.0 SBHPS 149 6782.32 4527 7000 0.149 4559CD1-02 50103203540000 MWAG 120100 ALP " 9/11/2012 24342.0 SBHPS 149 6782.32 4498 7000 0.116 4523CD1-02 50103203540000 MWAG 120100 ALP " 11/7/2012 25710.0 SBHPS 149 6784.62 4397 7000 0.120 4423CD1-02 50103203540000 MWAG 120100 ALP " 11/21/2012 26064.0 SBHPS 145 6784.62 4400 7000 0.120 4426CD1-05 50103203200000 MWAG 120100 ALP 6808.95 - 6824.66 8/26/2012 360.0 SBHPS 149 6622.27 4386 7000 0.141 4439CD1-06 50103203410000 DG 120100 ALP 6780.29 - 6792.92 5/22/2012 816.0 SBHPS 140 6579.57 4425 7000 0.119 4475CD1-17 50103203500000 OIL 120100 NANKUP 6674.6 - 6682.54, 6824.62 - 6813.19/30/2012 1111.0 SBHPS 156 6834.57 4285 7000 0.330 4340CD1-21 50103203620000 MWAG 120100 ALP 6983.74 - 6943.56 4/7/2012 2544.0 SBHPS 140 6833.51 4137 7000 0.369 4198CD1-21 50103203620000 MWAG 120100 ALP " 6/12/2012 4128.0 SBHPS 144 6817.78 3898 7000 0.459 3982CD1-21 50103203620000 MWAG 120100 ALP " 10/23/2012 7320.0 SBHPS 144 6777.99 3700 7000 0.421 3793CD1-21 50103203620000 MWAG 120100 ALP " 11/27/2012 8160.0 SBHPS 142 6741.49 3644 7000 0.431 3755CD1-22A 50103202500100 OIL 120100 ALP 6874.51 - 6869.18 4/14/2012 11784.0 SBHPS 158 6817.79 4759 7000 0.373 4827CD1-22B 50103202500200 OIL 120100 ALP 6754.87 - 6763.74, 6763.74 - 6772.7, 6772.7 - 6781.61, 6781.61 - 6790.49, 6790.49 - 6799.34, 6799.34 - 6803.48, 6809.99 - 6812.96, 6812.96 - 6814.15, 6814.15 - 6818.31, 6818.31 - 6818.910/2/2012 9999.0 SBHPS 149 6553.38 4250 7000 0.354 4408CD1-25 50103203250000 OIL 120100 ALP 6924.43 - 6972.15 12/8/2012 662.0 SBHPS 160 6848.71 4291 7000 0.400 4352CD1-28 50103203560000 OIL 120100 ALP 6965.21 - 7005.42 1/9/2012 2184.0 SBHPS 155 6843.88 4095 7000 0.419 4160CD1-28 50103203560000 OIL 120100 ALP " 6/9/2012 5832.0 SBHPS 158 6843.31 4278 7000 0.381 4338CD1-28 50103203560000 OIL 120100 ALP " 8/11/2012 495.0 SBHPS 157 6848.92 4057 7000 0.435 4123CD1-28 50103203560000 OIL 120100 ALP " 9/9/2012 1432.0 SBHPS 157 6848.92 4200 7000 0.436 4266ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CRU 2012 Surveillance Report 1 of 7 10‐412 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CD1-28 50103203560000 OIL 120100 ALP " 9/24/2012 1792.0 SBHPS 157 6871.24 4214 7000 0.432 4270CD1-28 50103203560000 OIL 120100 ALP " 9/25/2012 1816.0 SBHPS 157 6730.39 4156 7000 0.430 4272CD1-28 50103203560000 OIL 120100 ALP " 9/26/2012 1840.0 SBHPS 157 6730.39 4155 7000 0.430 4271CD1-28 50103203560000 OIL 120100 ALP " 9/27/2012 1864.0 SBHPS 157 6730.39 4152 7000 0.430 4268CD1-28 50103203560000 OIL 120100 ALP " 9/28/2012 1888.0 SBHPS 157 6730.39 4148 7000 0.430 4264CD1-28 50103203560000 OIL 120100 ALP " 9/29/2012 1912.0 SBHPS 157 6730.39 4144 7000 0.430 4260CD1-28 50103203560000 OIL 120100 ALP " 9/30/2012 1936.0 SBHPS 157 6730.39 4139 7000 0.430 4255CD1-28 50103203560000 OIL 120100 ALP " 10/1/2012 1960.0 SBHPS 157 6730.39 4134 7000 0.430 4250CD1-35 50103202970000 OIL 120100 ALP 6997.54 - 6954.53 5/14/2012 283.0 SBHPS 162 6922.26 3602 7000 0.400 3633CD1-35 50103202970000 OIL 120100 ALP " 8/8/2012 460.0 SBHPS 160 6922.26 3421 7000 0.427 3454CD1-35 50103202970000 OIL 120100 ALP " 8/28/2012 940.0 SBHPS 160 6922.26 3668 7000 0.431 3702CD1-35 50103202970000 OIL 120100 ALP " 9/18/2012 1433.0 SBHPS 160 6922.26 3832 7000 0.430 3865CD1-36 50103203090000 MWAG 120100 ALP 6993.94 - 6988.27 9/22/2012 3085.0 SBHPS 119 6911.75 3933 7000 0.446 3972CD1-36 50103203090000 MWAG 120100 ALP " 10/2/2012 4300.0 SBHPS 119 6911.75 3937 7000 0.446 3976CD1-39 50103203040000 MWAG 120100 ALP 7070.24 - 7052.53 7/12/2012 624.0 SBHPS 131 6960.81 4584 7000 0.443 4601CD1-39 50103203040000 MWAG 120100 ALP " 8/13/2012 1392.0 SBHPS 136 6960.81 4307 7000 0.441 4324CD1-39 50103203040000 MWAG 120100 ALP " 8/25/2012 1682.0 SBHPS 137 6960.81 4234 7000 0.392 4249CD1-39 50103203040000 MWAG 120100 ALP " 9/26/2012 2439.0 SBHPS 139 6960.81 4081 7000 0.440 4098CD1-39 50103203040000 MWAG 120100 ALP " 10/27/2012 3183.0 SBHPS 139 6960.81 3966 7000 0.441 3983CD1-40 50103202980000 OIL 120100 ALP 7065.26 - 7072.06, 7100.09 - 7104.82, 7107.9 - 7110.93, 7112.42 - 7118.1, 7122.09 - 7127.07, 7130.57 - 7135.01, 7102.11 - 7128.91, 7/22/2012 48.0 SBHPS 158 6951.36 1059 7000 0.314 1074CD1-43 50103203440000 OIL 120100 ALP 7076.21 - 7113.55 8/11/2012 516.0 SBHPS 156 6963.24 1588 7000 0.444 1604CD1-46 50103204850000 MWAG 120100 ALP 7017.33 - 7033.61 2/12/2012 216.0 SBHPS 126 6874.05 4828 7000 0.260 4861CRU 2012 Surveillance Report 2 of 7 10‐412 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CD1-48A 50103205920100 OIL 120100 ALP 7075.75 - 7075.67, 7088.49 - 7088.53, 7080.38 - 7080.42, 7074.29 - 7074.33, 7077.12 - 7077.12, 7076.03 - 7076.02, 7075.05 - 7074.98, 7078.84 - 7078.89, 7079.26 - 7079.2, 7073.71 - 7073.624/23/2012 9999.0 SBHPS 153 6893.87 3585 7000 0.440 3632CD1-48A 50103205920100 OIL 120100 ALP " 8/9/2012 480.0 SBHPS 160 6893.87 1709 7000 0.298 1741CD1-48A 50103205920100 OIL 120100 ALP " 10/27/2012 50.0 SBHPS 160 6893.87 1200 7000 0.298 1232CD2-01 50103205140000 OIL 120100 ALP 7000.58 - 6994.13 4/19/2012 2524.0 SBHPS 153 6777.20 4269 7000 0.298 4335CD2-02 50103205130000 MWAG 120100 ALP 7207.3 - 7188.92 6/19/2012 264.0 SBHPS 126 7067.13 4812 7000 0.298 4792CD2-06 50103204700000 MWAG 120100 ALP 7088.53 - 7016.72 5/20/2012 4896.0 SBHPS 138 6887.75 3768 7000 0.298 3801CD2-09 50103204960000 OIL 120100 ALP 7118.87 - 7115.86 1/12/2012 2976.0 SBHPS 158 6965.76 3784 7000 0.294 3794CD2-16 50103204260000 MWAG 120100 ALP 7083.38 - 7067.93 2/20/2012 240.0 SBHPS 127 6881.55 3518 7000 0.430 3569CD2-18 50103204660000 MWAG 120100 ALP 7239.98 - 7206.44 10/6/2012 1080.0 SBHPS 139 7046.89 3998 7000 0.298 3984CD2-21 50103205040000 OIL 120100 ALP 7163.23 - 7122.19 8/6/2012 408.0 SBHPS 158 6903.78 2822 7000 0.298 2851CD2-30 50103204650000 MWAG 120100 ALP 7251.78 - 7246.18 2/22/2012 4632.0 SBHPS 144 7064.44 3966 7000 0.298 3947CD2-36 50103204470000 MWAG 120100 ALP 7236.85 - 7293.72 4/2/2012 1920.0 SBHPS 138 7042.09 5302 7000 0.447 5283CD2-36 50103204470000 MWAG 120100 ALP 7236.85 - 7293.72 5/1/2012 2616.0 SBHPS 140 7042.09 5243 7000 0.459 5224CD2-36 50103204470000 MWAG 120100 ALP 7236.85 - 7293.72 8/10/2012 167.0 SBHPS 129 7042.09 5182 7000 0.448 5163CD2-40 50103204640000 MWAG 120100 ALP 7262.02 - 7268.02 10/28/2012 6216.0 SBHPS 144 7073.63 4432 7000 0.266 4412CRU 2012 Surveillance Report 3 of 7 10‐412 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CD2-42 50103203740000 OIL 120100 ALP 7221.46 - 7344.84, 7224.34 - 7224.38, 7225.65 - 7225.68, 7226.51 - 7226.48, 7223.35 - 7223.24, 7221.41 - 7221.39, 7221.24 - 7221.23, 7221.06 - 7221.11, 7221.8 - 7221.8, 7222.76 - 7222.82, 7226.35 - 7226.41, 7227.75 - 7227.77, 7230.61 - 7230.83, 7245.6 - 7246.09, 7272.99 - 7273.69, 7306.77 - 7307.567/25/2012 132.0 SBHPS 159 7076.94 887 7000 0.015 886CD2-43 50103204740000 OIL 120100 ALP 7275.66 - 7388.4 7/27/2012 180.0 SBHPS 158 6905.23 1321 7000 0.319 1351CD2-47 50103203940000 OIL 120100 ALP 7252.61 - 7240.45 5/26/2012 702.5 SBHPS 160 7078.45 1390 7000 0.296 1367CD2-50 50103204150000 OIL 120100 ALP 7141.61 - 7190.03 7/28/2012 203.0 SBHPS 160 7097.87 900 7000 0.024 898CD2-52 50103204590000 OIL 120100 ALP 7110.19 - 7146.99 4/10/2012 1536.0 SBHPS 145 6475.66 1620 7000 0.311 1783CD2-53 50103204940000 OIL 120100 ALP 7152.92 - 7148 5/2/2012 2208.0 SBHPS 158 7012.59 1900 7000 0.298 1896CD2-53 50103204940000 OIL 120100 ALP 7152.92 - 7148 7/29/2012 222.0 SBHPS 159 6993.59 1728 7000 0.300 1730CRU 2012 Surveillance Report 4 of 7 10‐412 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CD2-74 50103205910000 OIL 120100 ALP 7285.64 - 7285.65, 7283.99 - 7283.98, 7285.39 - 7285.48, 7283.93 - 7283.9, 7282.13 - 7282.11, 7280.75 - 7280.74, 7272.91 - 7272.8, 7267.12 - 7267.08, 7265.44 - 7265.42, 7264.83 - 7264.84, 7256.18 - 7256.02, 7252.49 - 7252.48, 7264 - 7263.98, 7262.4 - 7262.47, 7265.18 - 7265.228/8/2012 456.0 SBHPS 164 7050.37 2283 7000 0.298 2268CD2-77 50103206290000 OIL 120100 ALP 7262.98 - 7263.1, 7265.52 - 7265.56, 7286.36 - 7286.53, 7290.73 - 7290.66, 7295.19 - 7295.23, 7296.64 - 7296.63, 7301.16 - 7301.21, 7311.41 - 7311.58/10/2012 1200.0 SBHPS 159 7043.35 1346 7000 0.298 1333CD4-05 50103205580000 OIL 120100 ALP 7383.38 - 7388.3, 7501.63 - 7435.138/1/2012 312.0 SBHPS 168 7185.65 1555 7000 0.298 1500CD4-05 50103205580000 OIL 120100 ALP " 8/2/2012 312.0 SBHPS 169 7397.78 1382 7000 0.298 1263CRU 2012 Surveillance Report 5 of 7 10‐412 6. Oil Gravity408. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River/Alpine Oil Pool 7000' SS 0.78CD4-16 50103205350000 OIL 120100 ALP 7385.94 - 7385.87, 7385.9 - 7386.03, 7387.85 - 7387.91, 7392.22 - 7392.22, 7387.11 - 7387.02, 7387.62 - 7387.77, 7394.99 - 7394.98, 7384.12 - 7383.92, 7379.43 - 7379.24, 7376.89 - 7376.91, 7379.1 - 7379.15, 7376.32 - 7376.2, 7368.15 - 7367.87, 7358.73 - 7358.568/7/2012 432.0 SBHPS 160 7100.49 1210 7000 0.298 1180CD4-17 50103205340000 MWAG 120100 ALP 7434.5 - 7434.88 2/5/2012 528.0 SBHPS 138 7048.72 4475 7000 0.298 4460CD4-17 50103205340000 MWAG 120100 ALP " 2/18/2012 912.0 SBHPS 140 7048.72 4288 7000 0.298 4273CD4-17 50103205340000 MWAG 120100 ALP " 5/22/2012 3168.0 SBHPS 145 7048.72 3918 7000 0.298 3903CD4-208A 50103205170100 OIL 120100 ALP 7357.37 - 7407.98 8/10/2012 504.0 SBHPS 154 6859.64 1443 7000 0.298 1485CD4-210A 50103205330100 OIL 120100 ALP 7428.04 - 7440.88, 7444.79 - 7491.628/10/2012 508.0 SBHPS 162 7128.63 2512 7000 0.298 2474CD4-23 50103206210000 OIL 120100 ALP 7385.03 - 7440.36 8/7/2012 456.0 SBHPS 159 7033.38 2737 7000 0.298 2727CD4-24 50103206020000 MWAG 120100 ALP 7406.22 - 7431.48, 7468.83 - 7485.173/28/2012 1848.0 SBHPS 149 7158.51 2741 7000 0.298 2694CD4-24 50103206020000 MWAG 120100 ALP " 3/29/2012 1848.0 SBHPS 148 7450.68 4203 7000 0.298 4069CD4-26 50103206000000 MWAG 120100 ALP 7458.09 - 7461.08, 7461.08 - 7463.55, 7463.55 - 7465.54, 7465.54 - 7467.2, 7563.51 - 7459.237/10/2012 3816.0 SBHPS 154 7270.19 3278 7000 0.298 3197CD4-27 50103206440000 MWAG 120100 ALP 7465.65 - 7461.11, 7469.43 - 7470.62, 7470.62 - 7475.567/12/2012 9999.0 SBHPS 154 7368.47 2610 7000 0.298 2500CD4-306 50103205500000 MWAG 120100 NANKUP 7046.21 - 7053.29 6/5/2012 9552.0 SBHPS 145 6877.41 3477 7000 0.300 3514CRU 2012 Surveillance Report 6 of 7 10‐412 6. Oil Gravity:298. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)CD3-128 50103206380000 OIL 120120 FIORDNECH 6775.96 - 6785.14, 6943.29 - 6943.27, 6943.26 - 6943.29, 6952.05 - 6952.18, 6958.99 - 6959.08, 6965.77 - 6965.77, 6967.2 - 6967.21, 6969.15 - 6969.21, 6974.87 - 6974.98, 6975.35 - 6975.46, 6985.86 - 6986.02, 6993.87 - 6993.91, 6995.91 - 6995.88, 6998.01 - 6998.06, 7000.74 - 7000.76, 7004.22 - 7004.35, 7013.14 - 7013.17, 7013.48 - 7034.33/9/2012 99999.0 SBHPS 154 6656.22 2861 7000 0.580 2973CD3-128 50103206380000 OIL 120120 KUP/NECH " 8/4/2012 340.0 SBHPS 163 6848.66 1951 6850 0.327 1951CD3-302 50103205220000 MWAG 120120 FIORDKUP 6745.74 - 6762.32, 6765.46 - 6750.057/30/2012 11.0 SBHPS 105 6739.47 4507 6850 0.327 4543CD3-303 50103205680000 MWAG 120120 FIORDKUP 6624.06 - 6631.63, 6631.63 - 6639.277/30/2012 810.0 SBHPS 167 6631.63 3666 6850 0.327 3737CD3-303 50103205680000 MWAG 120120 FIORDKUP " 12/28/2012 2519.0 SBHPS 167 6609.49 3610 6850 0.327 3689CD3-304 50103205980000 OIL 120120 FIORDKUP 6576.56 - 6587.58 7/28/2012 170.0 SBHPS 168 6549.48 3495 6850 0.327 3593CD3-316A 50103205590100 MWAG 120120 FIORDKUP 6676.71 - 6679.51, 6678.22 - 6672.78, 6667.96 - 6664.438/16/2012 1027.0 SBHPS 138 6402.12 3616 6850 0.327 3762CD3-316A 50103205590100 MWAG 120120 FIORDKUP " 12/27/2012 4223.0 SBHPS 142 6402.15 3636 6850 0.327 3782CD3-106 50103206110000 OIL 120120 FIORDNECH 6908.55 - 6867.38, 6875.15 - 6844.927/29/2012 186.0 SBHPS 160 6513.33 2817 6850 0.327 2927CD3-107L1 50103205296000 OIL 120120 FIORDNECH 6712.75 - 6725.3, 7025.9 - 7004.72, 7009.18 - 6898.788/3/2012 306.0 SBHPS 174 6892.00 1528 6850 0.327 1514CD3-109 50103205100000 OIL 120120 FIORDNECH 6975.27 - 6769.22 3/11/2012 125.0 SBHPS 162 6620.61 2004 6850 0.342 2082ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River \ Fiord Oil Pool 6850' SS 0.8CRU 2012 Surveillance Report 1 of 410‐412 6. Oil Gravity:298. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River \ Fiord Oil Pool 6850' SS 0.8CD3-113 50103205410000 OIL 120120 FIORDNECH 6876.22 - 6876.61, 6883.86 - 6883.79, 6875.55 - 6875.39, 6867.52 - 6867.34, 6859.12 - 6859.01, 6866.17 - 6866.23, 6860.97 - 6860.83, 6856.24 - 6856.19, 6852.58 - 6852.64, 6856.89 - 6856.89, 6855.21 - 6855.22, 6855.12 - 6855.08, 6854.59 - 6854.64, 6861.93 - 6861.99, 6855.77 - 6855.54, 6845.43 - 6845.19, 6834.18 - 6834.12, 6832.96 - 6832.91, 6827.8 - 6827.73, 6827.59 - 6827.61, 6827.64 - 6827.62, 6825.85 - 6825.82, 6825.1 - 6825.15, 6829.12 - 6829.23, 6831.44 - 6831.43, 6832.62 - 6832.67, 6834.76 - 6834.74, 6833.56 - 6833.45, 6828.09 - 6827.97, 6816.24 - 6815.968/10/2012 481.0 SBHPS 158 6617.93 3694 6850 0.327 3770CD3-115 50103205930000 OIL 120120 FIORDNECH 6909.14 - 6864, 6864.17 - 6811.358/1/2012 270.0 SBHPS 162 6757.67 2984 6850 0.327 3014CRU 2012 Surveillance Report 2 of 410‐412 6. Oil Gravity:298. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99501-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitColville River \ Fiord Oil Pool 6850' SS 0.8CD3-117 50103205960000 OIL 120120 FIORDNECH 6909.48 - 6912.87, 6922.52 - 6922.88, 6918.68 - 6917.1, 6910.04 - 6909.58, 6912.53 - 6913.09, 6908.81 - 6907.28, 6900.87 - 6900.36, 6898.52 - 6898.25, 6896.57 - 6896.44, 6895.06 - 6894.33, 6894.26 - 6894.33, 6895.27 - 6895.25, 6889.66 - 6889.47, 6883.87 - 6883.82, 6883.9 - 6883.92, 6884.15 - 6884.14, 6880.34 - 6880.25, 6876.3 - 6876.17, 6869.09 - 6868.94, 6865.49 - 6865.5, 6866.15 - 6866.15, 6867.88 - 6867.88, 6869.29 - 6869.4, 6871.18 - 6871.18, 6870.46 - 6870.3, 6859.97 - 6859.678/3/2012 319.0 SBHPS 162 6824.06 2621 6850 0.327 2629CD3-118 50103205700000 MWAG 120120 FIORDNECH 6773.79 - 6778.64, 6893.47 - 6829.071/1/2012 285.0 SBHPS 121 6587.77 3685 6850 0.327 3771CD3-118 50103205700000 MWAG 120120 KUP/NECH " 2/4/2012 127.0 SBHPS 120 6568.16 3593 6850 0.327 3685CD3-118 50103205700000 MWAG 120120 FIORDKUP " 12/18/2012 210.0 SBHPS 133 6565.49 3043 6850 0.327 3136CRU 2012 Surveillance Report 3 of 410‐412 6. Oil Gravity:298. Well Name and Number:9. API Number 50XXXXXXXXXXXX NO DASHES10. Type See Instructions11. AOGCC Pool Code12. Zone 13. Perforated Intervals Top - Bottom TVDSS14. Final Test Date15. Shut-In Time, Hours16. Press. Surv. Type (see instructions for codes)17. B.H. Temp.18. Depth Tool TVDSS19. Final Observed Pressure at Tool Depth20. Datum TVDSS (input)21. Pressure Gradient, psi/ft.22. Pressure at Datum (cal)CD2-404 50103205300000 SW 120180 QAN 4011.54 - 4026.77, 4036.87 - 4036.66, 4035.69 - 4033.48, 4032.67 - 4031.18, 4028.84 - 4030.03, 4027.95 - 4025.46, 4018.01 - 4015.65, 4017.1 - 4013.79, 4018.55 - 4022.4441168 413 SBHPS 79 3815.39 2551 4000 0.34 2614CD2-404 50103205300000 SW 120180 QAN 4011.54 - 4026.77, 4036.87 - 4036.66, 4035.69 - 4033.48, 4032.67 - 4031.18, 4028.84 - 4030.03, 4027.95 - 4025.46, 4018.01 - 4015.65, 4017.1 - 4013.79, 4018.55 - 4022.4441217 1589 SBHPS 81 3815.39 2316 4000 0.34 2379CD2-464 50103205740000 OIL 120180 QAN 4044.45 - 4042.93, 4032.07 - 4028.78, 4025.08 - 4028.76, 4028.35 - 4036.9641112 60 SBHPS 88 3917.39 791 4000 0.34 819CD2-464 50103205740000 OIL 120180 QAN " 41131 504 SBHPS 88 4005.34 973 4000 0.34 971CD2-469 50103205800000 OIL 120180 QAN 4031.93 - 4033.91, 4038.09 - 4040.62, 4032.09 - 4028.22, 4027.53 - 4018.99, 4014.17 - 4012.1, 4012.41 - 4019.88, 4020.13 - 4006.24, 41113 80 SBHPS 86 3760.94 925 4000 0.34 1006ConocoPhillips Alaska Inc.POB 100360, Anchorage AK 99510-0360STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONRESERVOIR PRESSURE REPORT1. Operator:2. Address:3. Unit or Lease Name:4. Field and Pool: 5. Datum Reference: 7. Gas Gravity:Colville River UnitQannik Oil Oil Pool 4000' SS 0.6CRU 2012 Surveillance Report 1 of 210‐412 2012 CRU Reservoir Surveillance Report Attachment 4: 10-413 Report of Injection Project by Pool 2012 CRU Reservoir Surveillance Report Attachment 5: Surface Safety Valve Testing 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD1-01 1990460 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-01 1990460 Pad Test 8/27/2012 5/16/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-02 2001720 Pad Test 2/6/2012 12/1/2009 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-02 2001720 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-03 1991200 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-03 1991200 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-04 2001170 Pad Test 2/6/2012 160 100 99 3 P P OIL 571 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-04 2001170 Re-test 3/9/2012 150 100 100 P P P OIL 189 Josh Horvath Waived Due to the previous test being done during the time CD1-04 was choked back the L/P tripwas lower than the 25% of the FTP at the time of the test. A retest has been perfomed and allSVS passedCD1-04 2001170 Pad Test 8/27/2012 157 100 97 P P P OIL 190 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-05 1991280 Pad Test 2/6/2012 4/12/2009 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-05 1991280 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-06 2000830 Misc Test 2/8/2012 2000 2000 P P P GINJ 3585 Paul Gabriel Waived Bob Noble unable to witness testing.CD1-06 2000830 Pad Test 8/27/2012 4/18/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-07 2032250 Pad Test 2/6/2012 9/11/2010 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-07 2032250 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-08 2040590 Pad Test 2/6/2012 160 100 100 P P 9 OIL 221 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-08 2040590 Re-test 2/11/2012 155 100 100 P P P OIL 163 J. Thomas Waived Bob Noble unable to witness testing. These two wells are retest after wire line repaired.CD1-08 2040590 Pad Test 8/27/2012 8/11/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-08 2040590 Misc Test 8/30/2012 157 100 98 P P P OIL 197 Mike Sanders Waived Chuck Scheve unable to witness testing.CD1-09 2000710 Pad Test 2/6/2012 7/18/2008 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-09 2000710 Pad Test 8/27/2012 6/1/2011 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-10 2001710 Pad Test 2/6/2012 6/1/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-10 2001710 Pad Test 8/27/2012 3/28/2011 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-11 2041800 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-11 2041800 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-12 2042050 Pad Test 2/6/2012 160 100 99 P P P OIL 175 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-12 2042050 Pad Test 8/27/2012 157 100 99 P P P OIL 168 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-13 1990520 Pad Test 2/6/2012 1/1/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-13 1990520 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-14 2010380 Pad Test 2/6/2012 160 2000 2010 P P P GINJ 3740 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-14 2010380 Pad Test 8/27/2012 2000 2000 P P P GINJ 3802 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-16 1990940 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-16 1990940 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-17 2001450 Pad Test 2/6/2012 160 500 511 3 P P OIL 2455 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-17 2001450 Pad Test 8/27/2012SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-17 2001450 Misc Test 10/6/2012 154 500 499 P P P OIL 1695 Saul Waived John Crisp was unable to witness testing at this time.CD1-18 2042060 Pad Test 2/6/2012 160 100 98 P P P OIL 171 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.2012 CRU Surveillance Report1 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD1-18 2042060 Pad Test 8/27/2012 157 100 97 P P P OIL 167 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-20 2042400 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-20 2042400 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-21 2010060 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-21 2010060 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-229 2002150 Pad Test 2/6/2012 7/1/2007 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-229 2002150 Pad Test 8/27/2012 5/10/2006 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-22A 2001100 Pad Test 2/6/2012 1/17/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-22A 2001100 Pad Test 8/27/2012 1/17/2011 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-22B 2120650 Pad Test 10/14/2012 145 100 100 P P P OIL 200 B. Saul Waived Chuck Sheeve was unable to witness the testCD1-23 1990630 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-23 1990630 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-24 1990260 Pad Test 2/6/2012 160 100 99 P P P OIL 180 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-24 1990260 Pad Test 8/27/2012 157 100 97 P P 9 OIL 170 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-24 1990260 Re-test 8/29/2012 157 100 98 P P P OIL 170 Mike Sanders Waived Chuck Scheve unable to witness testing.CD1-25 2000080 Pad Test 2/6/2012 160 100 98 P P P OIL 182 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-25 2000080 Pad Test 8/27/2012 157 100 98 P P 8 OIL 173 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-26 1990880 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-26 1990880 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-27 2000060 Pad Test 2/6/2012 160 100 95 P P P OIL 178 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-27 2000060 Pad Test 8/27/2012 5/10/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-27 2000060 Misc Test 9/15/2012 150 100 99 P P 9 OIL 195 B. Saul Waived John Crisp waived witness CD1-27 SSSV repaired, tested, passed 9/28/12CD1-27 2000060 Re-test 9/28/2012 147 100 98 P P P OIL 184 Mike Sanders Waived John Crisp unable to come over and witness testing.CD1-28 2001990 Pad Test 2/6/2012 10/10/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-28 2001990 Misc Test 7/8/2012 155 100 100 P P P OIL 226 D.Digulimio Waived Jeff Jones waived witnessCD1-28 2001990 Pad Test 8/27/2012 7/11/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-30 2001320 Pad Test 2/6/2012 1/9/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-30 2001320 Pad Test 8/27/2012 1/30/2011 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-31 2001180 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-31 2001180 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-32 1991040 Pad Test 2/6/2012 1/8/2012 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-32 1991040 Pad Test 8/27/2012 1/8/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-33 2002120 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-33 2002120 Misc Test 3/28/2012 2000 2000 P P P GINJ 3826 Dan Andrus waived Jeff Jones Waived witnessCD1-33 2002120 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-34 2000430 Pad Test 2/6/2012 160 100 100 P P P OIL 340 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-34 2000430 Pad Test 8/27/2012 157 100 98 P P P OIL 260 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-35 1990380 Pad Test 2/6/2012 160 100 100 P P P OIL 320 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.2012 CRU Surveillance Report2 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD1-35 1990380 Misc Test 5/16/2012 144 100 108 P P P OIL 360 Tjohn Waived Matt Herrera waived AOGCC witnesCD1-35 1990380 Pad Test 8/27/2012 7/20/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-36 1991120 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-36 1991120 Misc Test 3/28/2012 2000 2000 P P P GINJ 3878 Dan Andrus waived Jeff Jones Waived witnessCD1-36 1991120 Pad Test 8/27/2012 5/16/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-37 1990670 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-37 1990670 Misc Test 4/7/2012 2000 2000 P P P GINJ 3800 Jessie Thomas Waived Lou Grimaldi unable to witness test.CD1-37 1990670 Pad Test 8/27/2012 6/16/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-38 2000030 Pad Test 2/6/2012 160 100 97 P P P OIL 170 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-38 2000030 Pad Test 8/27/2012 8/19/2012 SI Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-39 1990800 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-39 1990800 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-40 1990440 Pad Test 2/6/2012 160 100 101 P P 9 OIL 177 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-40 1990440 Re-test 2/11/2012 155 100 100 P P P OIL 192 J. Thomas Waived Bob Noble unable to witness testing. These two wells are retest after wire line repaired.CD1-40 1990440 Pad Test 8/27/2012 157 100 99 P 4 P OIL 167 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-40 1990440 Re-test 8/28/2012 157 100 100 P P P OIL 163 G. Seltenreich Waived Chuck Scheve unable to witness testing.CD1-41 2000170 Pad Test 2/6/2012 160 100 98 P P 8 2/7/2012 OIL 190 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-41 2000170 Pad Test 8/27/2012 157 100 98 P P P OIL 170 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-42 1991190 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-42 1991190 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-43 2001060 Pad Test 2/6/2012 160 100 95 P P P OIL 178 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-43 2001060 Pad Test 8/27/2012 157 100 95 P P P OIL 165 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-44 2000550 Pad Test 2/6/2012 160 100 96 P P P OIL 180 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-44 2000550 Pad Test 8/27/2012 157 100 97 P P P OIL 177 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-45 1991010 Pad Test 2/6/2012 160 2000 2000 P P P GINJ 3375 Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-45 1991010 Pad Test 8/27/2012WAG Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-46 2040240 Pad Test 2/6/2012WAG Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-46 2040240 Misc Test 4/3/2012 2000 2000 P P P GINJ 3780 Gary Seltenreich Waived Lou Grimaldi unable to witness test.CD1-46 2040240 Pad Test 8/27/2012 2000 2007 P P P GINJ 3689 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD1-48 2090010 Pad Test 2/6/2012 8/17/2011 SI Paul Gabriel waived Bob Noble was unable to witness testing. 2/05/12CD1-41 wire line pulled and replaced SSSV on 2/07/12.CD1-04 and CD1-17 tripped below required trip PSI.CD1-48A 2120040 Misc Test 5/4/2012 160 100 96 P P P OIL 189 Thomas Booth Waived John Crisp is unable to witness testing.CD1-48A was recently redrilled and the new permit number has been inserted.CD1-48A 2120040 Pad Test 8/27/2012 157 100 99 P P P OIL 174 Gary Seltenreich Chuck Scheve CD1-24 SSSV serviced, retested, passed 8/29/12, waived.CD1-25 SSSV scheduled for service or shut in within 14 daysCD1-40 SSV serviced, retested, passed 8/28/12, waivedCD2-01 2051180 Pad Test 3/26/2012 1/5/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-01 2051180 Pad Test 3/27/2012 1/5/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-01 2051180 Pad Test 3/28/2012 1/5/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-01 2051180 Pad Test 6/15/2012 1/5/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-01 2051180 Pad Test 9/7/2012 4/1/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/122012 CRU Surveillance Report3 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-01 2051180 Pad Test 9/8/2012 4/1/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-01 2051180 Misc Test 9/15/2012 150 100 96 P P 9 OIL 218 J. Lloyd Waived Lue Granaldi waived witness but may require a retest when here 9-22-CD2-01 SSSV, repaired, tested, passsed 9/17/12CD2-02 2051090 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-02 2051090 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-02 2051090 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-02 2051090 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-02 2051090 Pad Test 9/7/2012 6/19/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-02 2051090 Pad Test 9/8/2012 6/19/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-03 2050920 Pad Test 3/26/2012 155 100 96 P 4 9 OIL 221 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-03 2050920 Re-test 4/3/2012 147 100 98 P P P OIL 224 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-03 2050920 Re-test 4/20/2012 156 100 100 P P P OIL 220 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-03 2050920 Pad Test 6/15/2012 144 100 95 P P P OIL 202 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-03 2050920 Pad Test 9/7/2012 150 100 97 P P P OIL 222 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-05 2040970 Pad Test 3/26/2012 155 100 90 P P P OIL 225 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-05 2040970 Pad Test 6/15/2012 144 100 98 P P P OIL 209 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-05 2040970 Misc Test 8/16/2012 150 100 98 P P P OIL 251 Jody Doan Waived Bob Noble was unable to witness testing.CD2-05 2040970 Pad Test 9/7/2012 150 100 99 P P P OIL 227 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-06 2031590 Pad Test 3/26/2012 10/29/2011 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-06 2031590 Pad Test 3/27/2012 10/29/2011 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-06 2031590 Pad Test 3/28/2012 10/29/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-06 2031590 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-06 2031590 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-06 2031590 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-07 2031870 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-07 2031870 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-07 2031870 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-07 2031870 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-07 2031870 Pad Test 9/7/2012 7/11/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-07 2031870 Pad Test 9/8/2012 7/11/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-08 2022500 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-08 2022500 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-08 2022500 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.2012 CRU Surveillance Report4 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-08 2022500 Pad Test 6/15/2012 5/16/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-08 2022500 Pad Test 9/7/2012 8/28/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-08 2022500 Pad Test 9/8/2012 8/28/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-09 2041290 Pad Test 3/26/2012 155 100 98 P P P OIL 227 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-09 2041290 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-09 2041290 Pad Test 6/15/2012 5/16/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-09 2041290 Pad Test 9/7/2012 150 100 98 P P P OIL 231 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-10 2031950 Pad Test 3/26/2012 8/30/2011 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-10 2031950 Pad Test 3/27/2012 8/30/2011 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-10 2031950 Pad Test 3/28/2012 8/30/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-10 2031950 Pad Test 6/15/2012 8/30/2011 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-10 2031950 Pad Test 9/7/2012 8/30/2011 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-10 2031950 Pad Test 9/8/2012 8/30/2011 SI S. Brower Waived CD2-469 retested 9/15/12CD2-11 2051320 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-11 2051320 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-11 2051320 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-11 2051320 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-11 2051320 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-11 2051320 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-12 2030730 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-12 2030730 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-12 2030730 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-12 2030730 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-12 2030730 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-12 2030730 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-13 2022030 Pad Test 3/26/2012 155 100 95 P P P OIL 230 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-13 2022030 Pad Test 6/15/2012 6/7/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-13 2022030 Pad Test 9/7/2012 6/7/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-13 2022030 Pad Test 9/8/2012 6/7/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-13 2022030 Misc Test 10/17/2012 145 100 97 P P P OIL 235 Justin Llyod Waived Bob Nobles waived witness, unable to come out to Alpine this weekCD2-14 2011770 Pad Test 3/26/2012 155 100 95 P P P OIL 223 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-14 2011770 Pad Test 6/15/2012 144 100 100 P P P OIL 203 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other Fields2012 CRU Surveillance Report5 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-14 2011770 Pad Test 9/7/2012 150 100 96 P P 9 OIL 227 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-14 2011770 Re-test 9/15/2012 150 100 97 P P P OIL 218 J. Lloyd Waived John Crisp Waived witnessCD2-15 2011590 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-15 2011590 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-15 2011590 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-15 2011590 Pad Test 6/15/2012 2/28/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-15 2011590 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-15 2011590 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-16 2021440 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-16 2021440 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-16 2021440 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-16 2021440 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-16 2021440 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-16 2021440 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-17A 2050170 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-17A 2050170 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-17A 2050170 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-17A 2050170 Misc Test 4/24/2012 156 100 100 P P P GINJ 3296 Justin Lloyd Waived Lou Grimaldi unable to witness test.CD2-17A 2050170 Misc Test 6/17/2012 2000 2000 P P P GINJ 3687 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-17A 2050170 Pad Test 9/8/2012 2000 1990 P P P GINJ 3543 S. Brower Waived CD2-469 retested 9/15/12CD2-18 2031510 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-18 2031510 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-18 2031510 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-18 2031510 Pad Test 6/15/2012 6/1/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-18 2031510 Pad Test 9/7/2012 8/22/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-18 2031510 Pad Test 9/8/2012 8/22/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-18 2031510 Misc Test 10/17/2012 2000 2010 P P P GINJ 3226 Justin Llyod Waived Bob Nobles waived witness, unable to come out to Alpine this weekCD2-19 2021120 Pad Test 3/26/2012 155 100 96 P 4 P OIL 227 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 2021120 Pad Test 6/15/2012 3/28/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-19 2021120 Pad Test 9/7/2012 3/28/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-19 2021120 Pad Test 9/8/2012 3/28/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-19 2021120 Misc Test 10/17/2012 145 100 99 P P P OIL 232 Justin Llyod Waived Bob Nobles waived witness, unable to come out to Alpine this weekCD2-20 2031050 Pad Test 3/26/2012 155 100 92 P P P OIL 217 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 days2012 CRU Surveillance Report6 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-20 2031050 Pad Test 6/15/2012 144 100 98 P P P OIL 203 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-20 2031050 Pad Test 9/7/2012 150 100 99 P P 9 OIL 229 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-21 2042450 Pad Test 3/26/2012 155 100 96 P 5 P OIL 222 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-21 2042450 Re-test 4/3/2012 147 100 97 P P P OIL 227 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-21 2042450 Re-test 4/20/2012 156 100 100 P P P OIL 213 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-21 2042450 Pad Test 6/15/2012 144 100 98 P P P OIL 210 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-21 2042450 Pad Test 9/7/2012 150 100 94 P P P OIL 227 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-22 2020920 Pad Test 3/26/2012 2/5/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-22 2020920 Pad Test 3/27/2012 2/5/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-22 2020920 Pad Test 3/28/2012 2/5/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-22 2020920 Pad Test 6/15/2012 2/5/2012 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-22 2020920 Pad Test 9/7/2012 2/5/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-22 2020920 Pad Test 9/8/2012 2/5/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-23 2021340 Pad Test 3/26/2012 155 100 97 P P P OIL 235 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-23 2021340 Pad Test 6/15/2012 144 100 97 P P P OIL 208 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-23 2021340 Pad Test 9/8/2012 150 100 98 P P P OIL 223 S. Brower Waived CD2-469 retested 9/15/12CD2-24 2010950 Pad Test 3/26/2012 155 100 97 P 4 P OIL 224 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-24 2010950 Re-test 4/3/2012 147 100 98 P P P OIL 235 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-24 2010950 Re-test 4/20/2012 156 100 98 P P 9 OIL 225 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-24 2010950 Re-test 4/29/2012 157 100 100 P P P OIL 325 Dan Andrus Waived Luo Grimaldi unable to witness retest. May come out next week to witness tests.CD2-24 2010950 Misc Test 5/8/2012 157 100 100 P P P OIL 218 Tyler Brown Waived John Crisp is unable to witness SVS testing.CD2-24 2010950 Pad Test 6/15/2012 144 100 96 P P P OIL 208 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-24 2010950 Pad Test 9/7/2012 150 100 98 P P P OIL 238 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-25 2020740 Pad Test 3/26/2012 155 100 98 P 4 P OIL 226 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-25 2020740 Re-test 4/3/2012 147 100 97 P P P OIL 243 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-25 2020740 Re-test 4/20/2012 156 100 96 P P P OIL 218 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-25 2020740 Pad Test 6/15/2012 144 100 97 P P P OIL 216 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-25 2020740 Misc Test 8/12/2012 149 100 100 P P P OIL 275 Tyler Brown Waived Bob Noble was unable to witness testing. 8/12/12.CD2-25 2020740 Pad Test 9/7/2012 150 100 97 P P P OIL 235 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-26 2012320 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-26 2012320 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-26 2012320 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-26 2012320 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other Fields2012 CRU Surveillance Report7 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-26 2012320 Pad Test 9/7/2012 8/28/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-26 2012320 Pad Test 9/8/2012 8/28/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-27 2031770 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-27 2031770 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-27 2031770 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-27 2031770 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-27 2031770 Pad Test 9/7/2012 8/31/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-27 2031770 Pad Test 9/8/2012 8/31/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-27 2031770 Misc Test 11/17/2012 2000 1995 P P P GINJ 3975 Paul Gabriel Waived John Crisp was unable to witness testing.CD2-28 2022170 Pad Test 3/26/2012 155 100 93 P P P OIL 244 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-28 2022170 Pad Test 6/15/2012 144 100 98 P P P OIL 215 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-28 2022170 Pad Test 9/7/2012 150 100 99 P P P OIL 236 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-29 2021480 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-29 2021480 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-29 2021480 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-29 2021480 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-29 2021480 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-29 2021480 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-30 2031350 Pad Test 3/26/2012 8/13/2011 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-30 2031350 Pad Test 3/27/2012 8/13/2011 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-30 2031350 Pad Test 3/28/2012 8/13/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-30 2031350 Pad Test 6/15/2012 8/13/2011 SI J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-30 2031350 Pad Test 9/7/2012 8/13/2011 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-30 2031350 Pad Test 9/8/2012 8/13/2011 SI S. Brower Waived CD2-469 retested 9/15/12CD2-31 2040820 Pad Test 3/26/2012 155 100 93 P 4 9 OIL 225 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-31 2040820 Re-test 4/3/2012 147 100 96 P P P OIL 246 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-31 2040820 Re-test 4/20/2012 156 100 98 P P P OIL 219 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-31 2040820 Pad Test 6/15/2012 144 100 98 P P P OIL 215 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-31 2040820 Pad Test 9/8/2012 150 100 99 P P P OIL 233 S. Brower Waived CD2-469 retested 9/15/12CD2-32 2020290 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-32 2020290 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-32 2020290 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-32 2020290 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other Fields2012 CRU Surveillance Report8 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-32 2020290 Pad Test 9/7/2012 9/2/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-32 2020290 Pad Test 9/8/2012 9/2/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-33B 2011250 Pad Test 3/26/2012 155 100 90 P P P OIL 228 Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-33B 2011250 Pad Test 6/15/2012 144 100 99 P P P OIL 217 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-33B 2011250 Pad Test 9/7/2012 150 100 97 P P P OIL 236 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-34 2011910 Pad Test 3/27/2012 155 100 100 P P P OIL 239 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-34 2011910 Pad Test 6/15/2012 144 100 99 P P P OIL 215 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-34 2011910 Misc Test 8/13/2012 148 100 98 P P P OIL 500 Tyler Brown Waived Bob Noble unable to witness testing. 8/12/12.CD2-34 2011910 Pad Test 9/7/2012 150 100 99 P P P OIL 244 S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-35A 2022440 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-35A 2022440 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-35A 2022440 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-35A 2022440 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-35A 2022440 Pad Test 9/8/2012 2000 1980 P P P GINJ 3723 S. Brower Waived CD2-469 retested 9/15/12CD2-36 2030140 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-36 2030140 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-36 2030140 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-36 2030140 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-36 2030140 Pad Test 9/7/2012 8/17/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-36 2030140 Pad Test 9/8/2012 8/17/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-36 2030140 Misc Test 10/17/2012 2000 2000 P P P GINJ 3774 Justin Llyod Waived Bob Nobles waived witness, unable to come out to Alpine this weekCD2-37 2022110 Pad Test 3/27/2012 155 100 88 P P P OIL 233 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-37 2022110 Pad Test 6/15/2012 144 100 97 P P P OIL 218 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-37 2022110 Pad Test 9/8/2012 150 100 99 P P P OIL 232 S. Brower Waived CD2-469 retested 9/15/12CD2-38 2021710 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-38 2021710 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-38 2021710 Pad Test 6/15/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-38 2021710 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-38 2021710 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-39 2011600 Pad Test 3/27/2012 155 100 90 P P P OIL 237 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-39 2011600 Pad Test 6/15/2012 144 100 96 P P P OIL 230 J. Lloyd/ Andrus Waived John Crisp waived witness due to other work at other FieldsCD2-39 2011600 Misc Test 8/13/2012 148 100 97 P P P OIL 240 Tyler Brown Waived Bob Noble unable to witness testing. 8/12/12.2012 CRU Surveillance Report9 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-39 2011600 Pad Test 9/8/2012 150 100 97 P P P OIL 241 S. Brower Waived CD2-469 retested 9/15/12CD2-40 2031260 Pad Test 3/26/2012 2/12/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-40 2031260 Pad Test 3/27/2012 2/12/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-40 2031260 Pad Test 3/28/2012 2/12/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-40 2031260 Pad Test 9/7/2012 2/12/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-40 2031260 Pad Test 9/8/2012 2/12/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-41 2021260 Pad Test 3/27/2012 155 100 98 P P P OIL 234 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-41 2021260 Pad Test 6/16/2012 144 100 100 P P P OIL 214 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-41 2021260 Pad Test 9/8/2012 150 100 97 P P P OIL 240 S. Brower Waived CD2-469 retested 9/15/12CD2-42 2010670 Pad Test 3/27/2012 155 100 95 P P P OIL 237 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-42 2010670 Misc Test 5/7/2012 158 100 100 P P P OIL 233 Tyler Brown Waived John Crisp unable to witness testing at this time.CD2-42 2010670 Pad Test 6/16/2012 144 100 100 P P P OIL 219 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-42 2010670 Misc Test 8/13/2012 148 100 99 P P P OIL 243 Tyler Brown Waived Bob Noble unable to witness testing. 8/12/12.CD2-42 2010670 Pad Test 9/8/2012 150 100 98 P P P OIL 236 S. Brower Waived CD2-469 retested 9/15/12CD2-43 2031970 Pad Test 3/27/2012 155 100 82 P P P OIL 228 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-43 2031970 Pad Test 6/16/2012 144 100 100 P P P OIL 230 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-43 2031970 Misc Test 8/13/2012 148 100 98 P P P OIL 259 Tyler Brown Waived Bob Noble unable to witness testing. 8/12/12.CD2-43 2031970 Pad Test 9/8/2012 150 100 97 P P P OIL 238 S. Brower Waived CD2-469 retested 9/15/12CD2-44 2021650 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-44 2021650 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-44 2021650 Pad Test 6/16/2012WAG J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-44 2021650 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-44 2021650 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-45 2012120 Pad Test 3/27/2012 155 100 94 P 4 8 OIL 226 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-45 2012120 Re-test 4/3/2012 147 100 97 P P P OIL 238 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-45 2012120 Re-test 4/20/2012 156 100 98 P P P OIL 224 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-45 2012120 Pad Test 6/16/2012 144 100 100 P P P OIL 215 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-45 2012120 Pad Test 9/8/2012 150 100 95 P P P OIL 233 S. Brower Waived CD2-469 retested 9/15/12CD2-46 2020820 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-46 2020820 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-46 2020820 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-46 2020820 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-463 2081070 Pad Test 3/27/2012 155 100 100 P P P OIL 221 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-463 2081070 Misc Test 6/18/2012 144 100 98 P P P OIL 219 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-463 2081070 Pad Test 9/8/2012 150 100 100 P P P OIL 231 S. Brower Waived CD2-469 retested 9/15/122012 CRU Surveillance Report10 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-464 2080820 Pad Test 3/27/2012 155 100 93 P P P OIL 227 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-464 2080820 Misc Test 6/18/2012 144 100 100 P P P OIL 221 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-464 2080820 Pad Test 9/8/2012 150 100 99 P P P OIL 236 S. Brower Waived CD2-469 retested 9/15/12CD2-465 2081450 Pad Test 3/27/2012 155 100 90 P P P OIL 230 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-465 2081450 Misc Test 6/18/2012 144 100 100 P P P OIL 215 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-465 2081450 Pad Test 9/8/2012 150 100 98 P P P OIL 235 S. Brower Waived CD2-469 retested 9/15/12CD2-466 2080950 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-466 2080950 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-466 2080950 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-466 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-466 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-467 2081140 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-467 2081140 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-467 2081140 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-468 2081800 Pad Test 3/28/2012 155 100 90 P P 8 OIL 243 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-468 2081800 Re-test 4/3/2012 147 100 100 P P 9 OIL 237 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-468 2081800 Re-test 4/5/2012 157 100 100 P P P OIL 238 Tyler Brown Waived Lou Grimaldi unable to witness tests. CD2-58 SSSV scheduled for repair.CD2-468 2081800 Re-test 4/20/2012 156 100 99 P P 9 OIL 220 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-468 2081800 Re-test 4/25/2012 155 100 98 P P P OIL 222 Justin Lloyd Waived Lou Grimaldi unable to witness CD2-468 2081800 Misc Test 6/18/2012 144 100 99 P P 9 OIL 222 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-468 2081800 Re-test 6/23/2012 155 100 101 P P P OIL 222 Tyler Brown Waived Chuck Scheve unable to witness at this time.CD2-468 2081800 Pad Test 9/8/2012 150 100 99 P P P OIL 232 S. Brower Waived CD2-469 retested 9/15/12CD2-469 2081220 Pad Test 3/28/2012 155 100 94 P P P OIL 236 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-469 2081220 Misc Test 6/18/2012 144 100 100 P P P OIL 222 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-469 2081220 Pad Test 9/8/2012 150 100 98 P P 9 OIL 258 S. Brower Waived CD2-469 retested 9/15/12CD2-469 2081220 Re-test 9/15/2012 150 100 97 P P P OIL 247 J. Lloyd Waived John Crisp Waived witnessCD2-47 2012050 Pad Test 3/27/2012 155 100 94 P P 8 OIL 335 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-47 2012050 Re-test 4/8/2012 157 100 99 P P P OIL 230 Mike Graves Waived Lou Grimaldi unable to witness. CD2-47 Has a K-valve for an SSSV. Test tripped at 190 psig tubing pressure.CD2-47 2012050 Re-test 4/20/2012 156 100 97 P P P OIL 232 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-47 2012050 Misc Test 7/7/2012 155 100 100 P P P OIL 236 M. Graves Waived Jeff Jones waived witnessCD2-47 2012050 Pad Test 9/8/2012 150 100 95 P P P OIL 247 S. Brower Waived CD2-469 retested 9/15/12CD2-470 2081290 Pad Test 3/28/2012 155 100 90 P P P OIL 228 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-470 2081290 Misc Test 6/18/2012 144 100 100 P P P OIL 221 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-470 2081290 Pad Test 9/8/2012 150 100 100 P P P OIL 232 S. Brower Waived CD2-469 retested 9/15/12CD2-48 2021080 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-48 2021080 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-48 2021080 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-48 2021080 Pad Test 9/7/2012 8/17/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/122012 CRU Surveillance Report11 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-48 2021080 Pad Test 9/8/2012 8/17/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-48 2021080 Misc Test 11/21/2012 2000 2000 P P P GINJ 3562 Paul Gabriel Waived Chuck Scheve is unable to witness testing.CD2-49 2012490 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-49 2012490 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-49 2012490 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-49 2012490 Pad Test 9/7/2012 8/17/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-49 2012490 Pad Test 9/8/2012 8/17/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-49 2012490 Misc Test 11/23/2012 2000 2000 P P P GINJ 3972 Paul Gabriel Waived Chuck Scheve was unable to witness testing.CD2-50 2020490 Pad Test 3/27/2012 155 100 96 P 4 P OIL 217 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-50 2020490 Re-test 4/3/2012 147 100 97 P P P OIL 232 Walt Neiser Waived Lou Grimaldi unable to witness tests. CD2-468 waiting on repairs.CD2-50 2020490 Re-test 4/20/2012 156 100 98 P P P OIL 222 Justin Lloyd Chuck Sheeve CD2-24 SSSV scheduled for repair CD2-468 SSV scheduled for repairCD2-50 2020490 Misc Test 6/17/2012 144 100 100 P P P OIL 241 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-50 2020490 Pad Test 9/8/2012 150 100 96 P P P OIL 233 S. Brower Waived CD2-469 retested 9/15/12CD2-51 2022490 Pad Test 3/27/2012 2000 1940 P P P GINJ 3272 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-51 2022490 Misc Test 6/17/2012 2000 2000 P P P GINJ 3705 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-51 2022490 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-51 2022490 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-52 2030930 Pad Test 3/26/2012 2/7/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-52 2030930 Pad Test 3/27/2012 2/7/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-52 2030930 Pad Test 3/28/2012 2/7/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-52 2030930 Misc Test 4/18/2012 156 100 99 P P P OIL 230 Andrus Waived Jeff Jones waived the misc test but someone will be out to witness the State test on CD3CD2-52 2030930 Misc Test 6/17/2012 144 100 100 P P P OIL 219 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-52 2030930 Pad Test 9/8/2012 150 100 97 P P P OIL 226 S. Brower Waived CD2-469 retested 9/15/12CD2-53 2040890 Pad Test 3/26/2012 1/31/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-53 2040890 Pad Test 3/27/2012 1/31/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-53 2040890 Pad Test 3/28/2012 1/31/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-53 2040890 Misc Test 5/7/2012 158 100 98 P P P OIL 227 Tyler Brown Waived John Crisp unable to witness testing at this time.CD2-53 2040890 Misc Test 6/17/2012 144 100 98 P P P OIL 213 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-53 2040890 Pad Test 9/8/2012 150 100 98 P P P OIL 243 S. Brower Waived CD2-469 retested 9/15/12CD2-54 2041780 Pad Test 3/26/2012 2/7/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-54 2041780 Pad Test 3/27/2012 2/7/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-54 2041780 Pad Test 3/28/2012 2/7/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-54 2041780 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-54 2041780 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/122012 CRU Surveillance Report12 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-55 2031180 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-55 2031180 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-55 2031180 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-55 2031180 Misc Test 6/17/2012 2000 2000 P P P GINJ 3545 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-55 2031180 Pad Test 9/8/2012 2000 1995 P P P GINJ 3720 S. Brower Waived CD2-469 retested 9/15/12CD2-56 2041500 Pad Test 3/26/2012 1/11/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-56 2041500 Pad Test 3/27/2012 1/11/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-56 2041500 Pad Test 3/28/2012 1/11/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-56 2041500 Misc Test 6/29/2012 2000 2000 P P P GINJ 3062 Jody Doan Waived Chuck Scheve is unable to witness test at this time.CD2-56 2041500 Pad Test 9/8/2012 2000 1998 P P P GINJ 3699 S. Brower Waived CD2-469 retested 9/15/12CD2-57 2040720 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-57 2040720 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-57 2040720 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-57 2040720 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-57 2040720 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-58 2030850 Pad Test 3/27/2012 155 100 99 P P 9 OIL 230 Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-58 2030850 Re-test 4/5/2012 157 100 97 P P 9 OIL 235 Tyler Brown Waived Lou Grimaldi unable to witness tests. CD2-58 SSSV scheduled for repair.CD2-58 2030850 Re-test 4/10/2012 150 100 98 P P P OIL 225 Tyler Brown Waived John Crisp unable to witness retest at this time.CD2-58 2030850 Misc Test 6/17/2012 144 100 100 P P P OIL 212 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-58 2030850 Pad Test 9/8/2012 150 100 98 P P P OIL 239 S. Brower Waived CD2-469 retested 9/15/12CD2-59 2042480 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-59 2042480 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-59 2042480 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-59 2042480 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-59 2042480 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-60A 2091150 Pad Test 3/26/2012 3/6/2012 SI Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-60A 2091150 Pad Test 3/27/2012 3/6/2012 SI Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-60A 2091150 Pad Test 3/28/2012 3/6/2012 SI Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-60A 2091150 Misc Test 6/28/2012 2000 2000 P P P GINJ 3515 Mike Graves Waived Chuck Scheve unable to witness CD2-60A 2091150 Pad Test 9/8/2012 2000 1994 P P P GINJ 3729 S. Brower Waived CD2-469 retested 9/15/12CD2-72 2070570 Pad Test 3/28/2012 155 100 98 P P P OIL 247 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-72 2070570 Misc Test 6/18/2012 144 100 100 P P P OIL 235 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-72 2070570 Pad Test 9/8/2012 150 100 100 P P P OIL 253 S. Brower Waived CD2-469 retested 9/15/12CD2-73 2081960 Pad Test 3/28/2012 2000 1950 P P P GINJ 3550 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.2012 CRU Surveillance Report13 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD2-73 2081960 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-73 2081960 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD2-74 2081970 Pad Test 3/28/2012 155 100 99 P P P OIL 240 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-74 2081970 Misc Test 6/18/2012 144 100 100 P P P OIL 246 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-74 2081970 Pad Test 9/8/2012 150 100 98 P P P OIL 239 S. Brower Waived CD2-469 retested 9/15/12CD2-75 2080640 Pad Test 3/28/2012 155 100 94 P P P OIL 244 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-75 2080640 Misc Test 6/18/2012 144 100 100 P P P OIL 232 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-75 2080640 Pad Test 9/8/2012 150 100 100 P P P OIL 253 S. Brower Waived CD2-469 retested 9/15/12CD2-76 2090980 Pad Test 3/28/2012 155 100 99 P P P OIL 234 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-76 2090980 Pad Test 9/7/2012 4/18/2012 SI S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-76 2090980 Pad Test 9/8/2012 4/18/2012 SI S. Brower Waived CD2-469 retested 9/15/12CD2-77 2101790 Pad Test 3/28/2012 155 100 98 P P P OIL 230 Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-77 2101790 Misc Test 6/18/2012 144 100 100 P P P OIL 217 J. Lloyd/ Andrus Waived John Crisp waived witness due to work in other FieldsCD2-468 Scheduled for service and retest within 14 daysCD2-77 2101790 Pad Test 9/8/2012 150 100 96 P P P OIL 231 S. Brower Waived CD2-469 retested 9/15/12CD2-78 2090660 Pad Test 3/26/2012WAG Justin Lloyd John Crisp CD2-03 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-19 was SI on 3/28/12 pending SSV repairCD2-21, 24, & 25 SSV`s repaired on 03/28/12 waiting on retest.CD2-31 SSV repaired on 3/26/12 waiting on retest, SSSV scheduled for repair within 14 daysCD2-78 2090660 Pad Test 3/27/2012WAG Walt Neiser John Crisp CD2-45 SSV repaired on 3/27/12, SSSV repaired on 3/28/12 waiting on retest.CD2-47 was SI on 3/29/12 pending SSSV repairCD2-50 SSV repaired on 03/28/12 waiting on retest.CD2-58 SSSV scheduled for service within 14 daysCD2-78 2090660 Pad Test 3/28/2012WAG Justin Lloyd John Crisp CD2-468 SSSV scheduled for service within 14 daysContacted Lou Grimaldi to schedule retest at CD2.CD2-78 2090660 Pad Test 9/7/2012WAG S. Brower John Crisp John Crisp was able to witnessed these wells and waived wells listed on 9/8/12 SVS test report.CD2-14 retested 9/15/12 CD2-20 retested 9/22/12CD2-78 2090660 Pad Test 9/8/2012WAG S. Brower Waived CD2-469 retested 9/15/12CD3-106 2100010 Pad Test 4/19/2012 150 100 100 P P 8 OIL 350 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-106 2100010 Re-test 4/24/2012 156 100 100 P P P OIL 362 Quigley Waived Chuck Sheve unable to witness. May want to witness retests next week.CD3-106 2100010 Misc Test 10/11/2012 145 100 100 P P 9 OIL 304 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witness CD3-106 serviced, tested, passed retest 10/14/12CD3-106 2100010 Re-test 10/14/2012 145 100 100 P P P OIL 326 Justen Lloyd Waived Chuck Sheeve waived witness CD3-106 serviced, retested, passed 10/14/12CD3-107 2061890 Pad Test 4/19/2012 150 100 102 P P 9 OIL 315 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-107 2061890 Re-test 4/26/2012 157 100 102 P P P OIL 332 Robert Quigley Waived Lou Grimaldi waived witness 4-24-12. But may be out in the next few days and want to witnessCD3-107 2061890 Misc Test 10/11/2012 145 100 100 P P P OIL 271 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witness CD3-106 serviced, tested, passed retest 10/14/12CD3-108 2050330 Pad Test 4/19/2012WAG R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-108 2050330 Misc Test 5/31/2012 2000 2000 P P P GINJ 3233 Jody Doan Waived J. Jones Bob Nobels originally waived AOGCC witness. Due a mistake writing the wrong Well #on our board,we proceeded to test the wrong well. After discovering our mistake we immediatelynotified Jeff Jones. His recommendation was to test CD3-108 as soon as we had the chance test it. CD3 is a remote drillsite only accesible by air. Consequently 5-31-12 is the new date.CD3-109 2050590 Pad Test 3/26/2012 155 100 100 P P P OIL 390 Pat Mize Waived Jeff Jones waived witnessCD3-109 2050590 Pad Test 4/19/2012 150 150 150 P P NT OIL 325 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-109 2050590 Re-test 4/27/2012 157 100 102 P P P OIL 333 Robert Quigley Waived Lou Grimaldi unable to witness at this time. May come out next week to witness retests.CD3-109 2050590 Misc Test 10/14/2012 145 100 98 P P P OIL 276 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witnessCD3-110 2050410 Pad Test 4/19/2012 2000 2000 P P P GINJ 3420 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-110 2050410 Misc Test 9/3/2012 2000 1995 P P P GINJ 3650 T. John Booth Waived Bob Nobles waived witness on this well.CD3-110 2050410 Misc Test 12/30/2012 2200 2204 P P P GINJ 3500 Paul Gabriel Waived Witness Waived per John Crisp 12/19/2012CD3-111 2060300 Pad Test 4/19/2012 150 100 98 P P P OIL 340 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-111 2060300 Misc Test 8/10/2012 152 100 100 P P P OIL 335 Justin Lloyd Waived Bob Noble unable to witness testing.CD3-111 2060300 Misc Test 10/14/2012 145 100 99 P P P OIL 318 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witness2012 CRU Surveillance Report14 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD3-112 2060320 Pad Test 4/19/2012WAG R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-112 2060320 Misc Test 8/24/2012 2000 2000 P P P GINJ 3434 Jody Doan Waived Chuck Scheve unable to witness at this time.CD3-112 2060320 Misc Test 11/18/2012 2000 1994 P P P GINJ 3608 Walt Neiser Waived Chuck Scheve unable to witness testing.CD3-113 2070040 Pad Test 4/19/2012 150 100 100 P P P OIL 336 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-113 2070040 Misc Test 10/14/2012 145 100 97 P P P OIL 304 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witnessCD3-114 2070330 Misc Test 2/25/2012 156 2000 1996 P P P GINJ 3669 Pat Mize Waived Bob Noble unable to witness testing.CD3-114 2070330 Pad Test 4/19/2012 4/19/2012 SI R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-114 2070330 Misc Test 6/14/2012 2000 1950 P P P GINJ 3680 J Lloyd waived John Crisp waived witness.CD3-115 2090060 Pad Test 4/19/2012 150 100 90 P P P OIL 338 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-115 2090060 Misc Test 8/12/2012 149 100 97 P P P OIL 340 Justin Lloyd Waived Bob Noble unable to witness testing.CD3-115 2090060 Misc Test 10/14/2012 145 100 100 P P P OIL 309 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witnessCD3-117 2090260 Pad Test 4/19/2012 150 100 99 P P 9 OIL 327 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-117 2090260 Re-test 4/25/2012 155 100 99 P P P OIL 345 Robert Quigley Waived Lou Grimaldi unable to witness CD3-117 2090260 Misc Test 10/20/2012 130 100 100 P P P OIL 297 Daniel Andrus Waived Chuck Sheeve waived witness Bob Noble waived witnessCD3-118 2080250 Misc Test 2/23/2012 156 2000 2001 P P P GINJ 2932 Robert Quigley Waived Bob Noble contacted 2/23/12. Unable to witness.CD3-118 2080250 Pad Test 4/19/2012 2000 2000 P P P GINJ 2987 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-118 2080250 Misc Test 6/24/2012 2000 1992 P P P GINJ 3306 Justin Lloyd Waived Chuck Scheve unable to witness at this time.CD3-119 2120070 Misc Test 5/13/2012 144 100 98 P P P OIL 330 Sanders Waived John Crisp is unable to witness SVS testing at this time.Note; CD3-119 is a new well.CD3-119 2120070 Misc Test 10/20/2012 130 100 102 P P P OIL 278 Daniel Andrus Waived Chuck Sheeve waived witness Bob Noble waived witnessCD3-121 2100220 Pad Test 4/19/2012 2000 2000 P P P GINJ 3743 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-122 2091530 Pad Test 4/19/2012 150 100 92 P P P OIL 333 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-122 2091530 Misc Test 10/20/2012 130 100 98 P P P OIL 280 Daniel Andrus Waived Chuck Sheeve waived witness Bob Noble waived witnessCD3-123 2100310 Pad Test 4/19/2012 4/16/2012 SI R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-123 2100310 Misc Test 5/9/2012 2000 2001 P P P GINJ 3650 Mike Sanders Waived John Crisp is unable to witness SVS testing.CD3-123 2100310 Misc Test 12/20/2012 2200 2200 P P P GINJ 4028 Neisser Waived Witness Waived per John Crisp 12/19/2012CD3-124 2100080 Misc Test 1/30/2012 150 2000 2005 P P P GINJ 3709 Robert Quigley Waived John Crisp waived witnessCD3-124 2100080 Pad Test 4/19/2012 2000 2000 P P P GINJ 3526 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-125 2101890 Pad Test 4/19/2012 150 100 90 P P 9 OIL 335 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-125 2101890 Misc Test 5/2/2012 156 100 99 P P P OIL 328 Robert Quigley Waived John Crisp Is unable to witness testing at this time.CD3-125 2101890 Misc Test 10/20/2012 130 100 98 P P P OIL 281 Daniel Andrus Waived Chuck Sheeve waived witness Bob Noble waived witnessCD3-128 2110370 Pad Test 3/24/2012 155 100 100 P P P OIL 380 Pat Mize Waived Jeff Jones waived witnessCD3-128 2110370 Pad Test 4/19/2012 150 100 100 P P P OIL 339 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-128 2110370 Misc Test 10/20/2012 130 100 100 P P P OIL 285 Daniel Andrus Waived Chuck Sheeve waived witness Bob Noble waived witnessCD3-198 2110240 Pad Test 4/19/2012 4/16/2012 SI R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-198 2110240 Misc Test 5/2/2012 2000 2000 P P P GINJ 3513 Robert Quigley Waived John Crisp Is unable to witness testing at this time.CD3-199 2110100 Pad Test 4/19/2012 150 100 95 P P P OIL 330 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-199 2110100 Pad Test 10/7/2012 145 100 100 P P P OIL 281 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witnessCD3-301A 2100170 Pad Test 4/19/2012 150 100 95 P P P OIL 349 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-301A 2100170 Pad Test 10/7/2012 145 100 100 P P P OIL 307 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witnessCD3-302A 2100350 Pad Test 4/19/2012WAG R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-302A 2100350 Misc Test 5/14/2012 2000 1999 P P 9 GINJ 3292 Sanders Waived Matt Herrera waived witnessCD3-302A 2100350 Misc Test 8/12/2012 2000 1996 P P P GINJ 3145 Justin Lloyd Waived Bob Noble unable to witness testing.CD3-303 2080130 Pad Test 4/19/2012 150 150 150 P P P OIL 353 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-304 2090280 Pad Test 4/19/2012 150 100 99 P P P OIL 318 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-304 2090280 Misc Test 8/14/2012 151 100 100 P P P OIL 440 Justin Lloyd Waived Bob Noble unable to witness testing.CD3-304 2090280 Pad Test 10/7/2012 145 100 100 P P P OIL 347 Lloyd/Smith Waived Chuck Sheeve waived witness Bob Nobles waived witness2012 CRU Surveillance Report15 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD3-305 2081930 Pad Test 4/19/2012 2000 1995 P P P GINJ 2960 R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD3-305 2081930 Misc Test 11/22/2012 2000 2000 P P P GINJ 3083 Paul Gabriel Waived Chuck Scheve is unable to witness testing.CD3-316A 2080110 Pad Test 4/19/2012WAG R. Quigley Chuck Sheeve CD3-125 we are unable to rig up wire line. Drilling rig is on CD3-27.CD3-109 SSSV removed for fracture treatment.CD4-03 2111130 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-03 2111130 Misc Test 3/20/2012 2000 2000 P P 9 GINJ 3653 J. Thomas Waived Well is on the well work list to replace the SSSVMatt with AOGCC waved witnessCD4-03 2111130 Re-test 4/3/2012 2000 1999 P P P GINJ 3710 Gary Seltenreich Waived Lou Grimaldi unable to witness. RetestCD4-03 2111130 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-03 2111130 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-03 2111130 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-03 2111130 Misc Test 11/13/2012 2000 1999 P P P GINJ 4010 Brad Saul Waived John Crisp was unable to witness testing.CD4-03 2111130 Misc Test 11/13/2012 2000 1999 3 P P GINJ 4010 Brad Saul Waived John Crisp was unable to witness testing.CD4-03 2111130 Re-test 12/11/2012 2200 2200 P P P GINJ 4011 M. Brueggeman Waived Louis Grimaldi was unable to witness testing.CD4-03 LPP was recalibrated and passed retest on 12/11/12CD4-03 2111130 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-03 2111130 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-05 2071550 Pad Test 1/18/2012 144 100 98 P P 9 OIL 313 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-05 2071550 Re-test 2/2/2012 158 100 100 P P P OIL 323 Terry Mullins waived Bob Nobles waived witness CD4-05 was restested on 2/3/12CD4-05 2071550 Pad Test 7/14/2012 144 100 98 P P 9 OIL 305 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-05 2071550 Misc Test 8/13/2012 148 100 98 P P P OIL 289 Shorty Davis Waived Bob Noble was unable to witness testing 8/12/12CD4-05 2071550 Pad Test 10/8/2012 145 100 99 P P P OIL 270 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-05 2071550 Pad Test 1/6/2013 120 100 97 P P P OIL 290 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-05 2071550 Pad Test 1/6/2013 120 100 97 P P P OIL 290 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-07 2071180 Pad Test 1/18/2012 144 100 95 P P P OIL 314 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-07 2071180 Pad Test 7/14/2012 144 100 100 P P P OIL 275 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-07 2071180 Pad Test 10/8/2012 145 100 99 P P P OIL 272 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-07 2071180 Pad Test 1/6/2013 120 100 95 P P P OIL 311 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-07 2071180 Pad Test 1/6/2013 120 100 95 P P P OIL 311 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-12 2100910 Pad Test 1/18/2012GINJ 3932 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-12 2100910 Misc Test 1/21/2012 2000 1955 P P P GINJ 3826 Nizer/ Booth Waived Bob Noble waived witness of the testingCD4-12 2100910 Pad Test 7/14/2012 7/12/2012 SI D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-12 2100910 Pad Test 7/14/2012 7/12/2012 SI D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-12 2100910 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-12 2100910 Misc Test 11/19/2012 2000 1998 P P P GINJ 3683 Robert Quigley Waived Chuck Scheve is unable to witness testing.CD4-12 2100910 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-12 2100910 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waived2012 CRU Surveillance Report16 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD4-16 2061310 Pad Test 1/18/2012 144 100 101 P P P OIL 313 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-16 2061310 Pad Test 7/14/2012 144 100 100 P P P OIL 260 D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-16 2061310 Misc Test 10/15/2012 145 100 98 P P P OIL 264 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-16 2061310 Pad Test 1/6/2013 120 100 96 P P P OIL 176 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-16 2061310 Pad Test 1/6/2013 120 100 96 P P P OIL 176 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-17 2061180 Pad Test 1/18/2012 1/14/2012 SI Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-17 2061180 Pad Test 7/14/2012 1/11/2012 SI D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-17 2061180 Pad Test 7/14/2012 1/11/2012 SI D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-17 2061180 Misc Test 9/6/2012 2000 1980 P P P GINJ 3675 M. Graves Waived Bob Nobles waived witness on this well.CD4-17 2061180 Misc Test 10/12/2012 2000 1997 P P P GINJ 4000 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-208A 2110600 Pad Test 1/18/2012 144 150 149 P P P OIL 317 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-208A 2110600 Pad Test 7/14/2012 144 100 100 P P P OIL 240 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-208A 2110600 Misc Test 10/15/2012 145 100 99 P P P OIL 284 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-208A 2110600 Pad Test 1/6/2013 120 100 97 P P P OIL 311 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-208A 2110600 Pad Test 1/6/2013 120 100 97 P P P OIL 311 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-209 2060650 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-209 2060650 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-209 2060650 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-209 2060650 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-209 2060650 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-209 2060650 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-210A 2110720 Pad Test 1/18/2012 144 100 99 P P P OIL 318 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-210A 2110720 Pad Test 7/14/2012 144 100 101 P P P OIL 240 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-210A 2110720 Misc Test 10/15/2012 145 100 100 P P P OIL 287 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-210A 2110720 Pad Test 1/6/2013 120 100 102 P P P OIL 304 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-210A 2110720 Pad Test 1/6/2013 120 100 102 P P P OIL 304 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-211 2061530 Pad Test 1/18/2012 144 100 101 P P P OIL 366 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-211 2061530 Pad Test 7/14/2012 144 100 99 P P 9 OIL 240 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-211 2061530 Misc Test 8/13/2012 148 100 100 P P P OIL 291 Shorty Davis Waived Bob Noble was unable to witness testing 8/12/12CD4-211 2061530 Misc Test 10/15/2012 145 100 98 P P P OIL 286 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-211 2061530 Pad Test 1/6/2013 120 100 94 P P P OIL 325 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-211 2061530 Pad Test 1/6/2013 120 100 94 P P P OIL 325 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-214 2061450 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/122012 CRU Surveillance Report17 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD4-214 2061450 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-214 2061450 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-214 2061450 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-214 2061450 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-214 2061450 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-215 2061570 Pad Test 1/18/2012 144 100 97 P P P OIL 336 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-215 2061570 Pad Test 7/14/2012 144 100 98 P P P OIL 240 D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-215 2061570 Misc Test 10/15/2012 145 100 98 P P P OIL 290 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-215 2061570 Pad Test 1/6/2013 120 100 97 P P P OIL 304 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-215 2061570 Pad Test 1/6/2013 120 100 97 P P P OIL 304 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-23 2100670 Pad Test 1/18/2012OIL 319 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-23 2100670 Misc Test 1/21/2012 144 100 97 P P P OIL 336 Nizer/ Booth Waived Bob Noble waived witness of the testingCD4-23 2100670 Pad Test 7/14/2012 144 100 98 P P 9 OIL 300 D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-23 2100670 Misc Test 8/13/2012 148 100 100 P P P OIL 330 Shorty Davis Waived Bob Noble was unable to witness testing 8/12/12CD4-23 2100670 Misc Test 10/15/2012 145 100 98 P P 9 OIL 290 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-23 2100670 Re-test 10/19/2012 145 100 96 P P P OIL 340 T John Booth Waived Bob Noble was unable to witness the testing.CD4-23 2100670 Pad Test 1/6/2013 120 100 98 P P 8 OIL 329 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-23 2100670 Pad Test 1/6/2013 120 100 98 P P 8 OIL 329 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-23 2100670 Re-test 1/12/2013 132 100 98 P P P OIL 380 P. Gabriel Waived Bob Nobel witnessed the original test and waived the re-testCD4-24 2090970 Pad Test 1/18/2012 1/11/2012 SI Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-24 2090970 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-24 2090970 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-24 2090970 Misc Test 10/15/2012 2000 1997 P P P GINJ 3960 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-25 2091500 Pad Test 1/18/2012OIL 293 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-25 2091500 Misc Test 1/21/2012 144 100 95 P P P OIL 326 Nizer/ Booth Waived Bob Noble waived witness of the testingCD4-25 2091500 Pad Test 7/14/2012 144 100 96 P P P OIL 260 D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-25 2091500 Misc Test 10/15/2012 145 100 98 P P P OIL 306 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-25 2091500 Pad Test 1/6/2013 120 100 96 P P P OIL 319 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-25 2091500 Pad Test 1/6/2013 120 100 96 P P P OIL 319 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-26 2090490 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-26 2090490 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-26 2090490 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/122012 CRU Surveillance Report18 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD4-26 2090490 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-26 2090490 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-26 2090490 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-27 2111460 Misc Test 5/19/2012 150 100 100 P P P OIL 290 J. Thomas Waived Bob Nobils waived the AOGCC witnessCD4-27 2111460 Pad Test 7/14/2012 7/12/2012 SI D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-27 2111460 Pad Test 7/14/2012 7/12/2012 SI D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-27 2111460 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-27 2111460 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-27 2111460 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-298 2101300 Pad Test 1/18/2012 144 100 100 P P P OIL 314 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-298 2101300 Pad Test 7/14/2012 144 100 89 P P P OIL 280 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-298 2101300 Pad Test 10/8/2012 145 100 99 P P P OIL 273 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-298 2101300 Pad Test 1/6/2013 120 100 95 P P P OIL 281 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-298 2101300 Pad Test 1/6/2013 120 100 95 P P P OIL 281 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-301B 2071800 Pad Test 1/18/2012 144 100 98 P P P OIL 320 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-301B 2071800 Pad Test 7/14/2012 144 100 90 P P P OIL 280 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-301B 2071800 Pad Test 10/8/2012 145 100 99 P P P OIL 275 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-301B 2071800 Pad Test 1/6/2013 120 100 96 P P P OIL 295 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-301B 2071800 Pad Test 1/6/2013 120 100 96 P P P OIL 295 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-302 2070560 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-302 2070560 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-302 2070560 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-302 2070560 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-302 2070560 Misc Test 12/30/2012 2200 2197 P P P GINJ 2917 Brad Saul Waived Witness Waived per John Crisp 12/19/2012 by e-mailCD4-304 2071320 Pad Test 1/18/2012 144 100 96 P P P OIL 303 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-304 2071320 Pad Test 7/14/2012 144 100 101 P P P OIL 246 D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-304 2071320 Pad Test 10/8/2012 145 100 100 P P P OIL 280 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-304 2071320 Pad Test 1/6/2013 120 100 95 P P P OIL 292 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-304 2071320 Pad Test 1/6/2013 120 100 95 P P P OIL 292 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-306 2070940 Misc Test 10/2/2012 2000 1991 P P P GINJ 3350 Andrus Waived John Crisp is unable to witness tests at this time.CD4-306 2070940 Pad Test 10/8/2012 2000 1993 P P P GINJ 395 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-306 2070940 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-306 2070940 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waived2012 CRU Surveillance Report19 of 20SSSV Test Results 2012 WELL NUMBERPERMIT NUMBER Test Type Test DateSEPAR PSISET PSIL P TRIPL P TRIP 2NDLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODERETEST_SI_DATEWELL TYPETUBING PSI OPERATOR REP AOGCC REP COMMENTS_1 COMMENTS_2 COMMENTS_3 COMMENTS_4CD4-318A 2061130 Pad Test 1/18/2012 144 150 140 P P 9 OIL 354 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-318A 2061130 Re-test 2/2/2012 156 150 149 P P P OIL 350 Terry Mullins waived Bob Nobles waived witness CD4-05 was restested on 2/3/12CD4-318A 2061130 Pad Test 7/14/2012 144 150 148 P P 9 OIL 300 D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-318A 2061130 Misc Test 8/13/2012 148 100 96 P P P OIL 360 Shorty Davis Waived Bob Noble was unable to witness testing 8/12/12CD4-318A 2061130 Misc Test 10/15/2012 145 150 148 P P P OIL 473 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-318A 2061130 Pad Test 1/6/2013 120 150 149 P P 8 OIL 300 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-318A 2061130 Pad Test 1/6/2013 120 150 149 P P 8 OIL 300 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-318A 2061130 Re-test 1/12/2013 132 150 149 P P P OIL 363 P. Gabriel Waived Bob Nobel witnessed the original test and waived the re-testCD4-319 2051480 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-319 2051480 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-319 2051480 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-319 2051480 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-319 2051480 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-319 2051480 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-320 2060550 Pad Test 1/18/2012 144 150 147 P P P OIL 325 Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-320 2060550 Misc Test 7/17/2012 144 150 148 P P 9 OIL 438 D.Andrus Waived Matt Harrera was unable to witness the test on this well.CD4-320 shut in 7/17/12CD4-320 2060550 Misc Test 10/15/2012 145 150 150 P P P OIL 518 B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-23, serviced, retested, passed 10/19/12CD4-320 2060550 Pad Test 1/6/2013 120 150 144 P P P OIL 349 B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-320 2060550 Pad Test 1/6/2013 120 150 144 P P P OIL 349 B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-321 2061420 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-321 2061420 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-321 2061420 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-321 2061420 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-321 2061420 Misc Test 10/31/2012 2000 2000 P P P GINJ 3509 W. Nizer Waived Bob Noble waived witness for this CD4-321 2061420 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-321 2061420 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-322 2071010 Pad Test 1/18/2012WAG Nizer/ Booth Waived Bob Noble waived the witness of the testingCD4-05 SSSV failed to hold DP CD4-318A SSSV failed to hold DP CD4-12, 23, 25 tested 1/21/12CD4-322 2071010 Pad Test 7/14/2012WAG D Andrus waived Matt Herrera had a short window of time to witness and was unable to witness the intire CD4pad. This is the second sheet and Matt waived witness for these wells.CD4-23, CD4-318A shut in 7/19/12CD4-322 2071010 Pad Test 7/14/2012WAG D Andrus Matt Herrera Matt Herrera had a short window of time to witness and was unable to witness the entire CD4pad. The rest of the wells were completed the same day and are on a separate form.CD4-05, CD4-211 shut in 7/19/12CD4-322 2071010 Pad Test 10/8/2012WAG B. Saul Waived Chuck Sheeve was unable to witness the testing.CD4-322 2071010 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Noble CD4-17, CD4-24, CD4-302 tested 1/7/13 waivedCD4-322 2071010 Pad Test 1/6/2013WAG B.Saul/Mudock/Hicks Bob Nobel CD4-17, CD4-24, CD4-302 tested 1/7/13 waived2012 CRU Surveillance Report20 of 20SSSV Test Results 2012