Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2014 BadamiSAVANT
ALASKA
February 28, 2015
Ms. Cathy Foerster
Chair, Commissioner
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave #100
Anchorage, AK 99501-3539
FEB 2 7 2015
Subject: Badami Field, Badami Pool Annual Reservoir Performance Report - 2014
Dear Ms. Foerster:
Savant Alaska LLC ("SALLC"), as operator of the Badami Unit, hereby submits the
attached Annual Reservoir Performance Report in accordance with the requirements of
Rule 9 of the Badami Oil Pool Area Injection Order, dated August 26, 1998 and 20
AAC.25.115. This report covers the period January 1 through December 31, 2014.
SALLC reserves the right to alter the content of the analyses contained in this report at
any time based upon the most recent surveillance information obtained.
Please contact David Kumar at 907-433-3822 if there are any other questions.
Sincerely,
D i umar
anager
Production/Reservoir Engineering
Cook Inlet Energy
CC: Paul Decker, DNR (via US Mail)
Teresa Imm, ASRC (via email)
David Hall, Cook Inlet Energy (via email)
Documentation Unit
601 W. 5th Avenue, Suite 310, Anchorage, AK 99501
907-334-6745(Ma€n) I 907-334-6735(Fax) ECOPY
I
Table of Contents
1. Progress of the Enhanced Recovery Project/Reservoir Management Summary ............ 3
2. Voidage Balance............................................................................................................. 3
3. Reservoir Pressure Monitoring....................................................................................... 3
4. Production Logging........................................................................................................ 3
5. Special Monitoring.......................................................................................................... 3
6. Evaluation of Well Testing and Allocation.................................................................... 4
7. Future Development Plans.............................................................................................. 4
8. Review of Plan of Development of Operations and Development ................................. 4
9. Status of Well Shut-in for 365 Days or More (20 AAC 25.115) .................................... 5
Appendices
Table 1: Badami Well Disposition — As of December 31, 2014 ........................................ 6
Table 2: Badami Production/Injection — Surface Units ..................................................... 7
Table 3: Badami Production/Injection Reservoir Units .................................................. 8
Table 4: 2014 Badami Pressure Monitoring...................................................................... 9
Table 5: Badami Well Testing Frequency Summary....................................................... 10
Figure 1: Badami Field Production History..................................................................... 11
Figure 2: Badami Gas Disposition History...................................................................... 12
Badami Pool Annual Reservoir Performance Report - 2014
1. Progress of the Enhanced Recovery Project/Reservoir Management Summary
Production was from 8 wells with gas injection into one well. Static pressure surveys
were obtained from wells 131-14, B1 -18A, BI -36 and 131-38. Table 4 contains a
summary of the static reservoir pressure readings acquired in 2014.
The total volume of oil produced from the Badami reservoir during the report period
was 392,464 STBO. A total of 555,615 MSCF of gas was produced of which 3,881
MSCF was injected back into the producing formation. No new wells were drilled and
completed during the reporting period. Well disposition is detailed in Table 1.
The oil production and gas disposition history of the field is shown in Figure 1 and
Figure 2 respectively.
2. Voidage Balance
Production and injection volumes and reservoir voidage by month are detailed in
Table 2 and Table 3. Cumulative voidage for 2014 was negative 697,784 reservoir
barrels.
3. Reservoir Pressure Monitoring
Four static pressure surveys were taken at Badami during the report period and are
listed in Table 4. These surveys show that the pressures in the individual lobes of the
reservoir continue to deplete over time consistent with the depletion drive recovery
method employed in the field.
4. Production Logging
No production logging was conducted during the report period.
5. Special Monitoring
No special monitoring was performed in 2014
Downhole pressure monitoring was performed on B 1-14, B 1-18A, B 1 -3 6 and B 1-3 8
in 2014 as outlined in Table 4.
3
Monitoring of well integrity and surveillance activity on the Class I disposal well, B 1-
01, was completed in 2014 and will continue pursuant to statutory requirement.
6. Evaluation of Well Testing and Allocation
Table 5 is a summary of well testing frequency for each of the Badami wells.
Daily oil production allocation to each well is accomplished by pro -rating the oil rates
from the most recent well test such that the total oil produced from all wells equals the
amount measured by the custody transfer pipeline meter.
7. Future Development Plans
On November 16, 2012, Savant Alaska LLC ("SALLC"), as Unit Operator, submitted
and application to expand the Badami Unit to provide for the orderly drilling of an
exploration test well. On March 15, 2013, the DNR approved in part and denied in part
the Badami Expansion application. This decision was appealed be SALLC on April 3,
2013 and a subsequent Request for Stay of the activities proposed under the plan of
exploration for the unit expansion was submitted to DNR on August 19, 2013. Savant
met with DNR Commissioner on October 8, 2014 to discuss the appeal of the Badami
Unit Expansion decision. No decision has been made by DNR on the appeal to date.
Monitoring of well integrity and surveillance activity on the Class I disposal well, B1-
01, will continue pursuant to statutory requirement.
Reservoir pressure data will be acquired during 2015 to monitor Badami reservoir
depletion.
8. Review of Plan of Development of Operations and Development
The 11th Plan of Development for the Badami Unit (POD) was approved by the
Department of Natural Resources for the period of November 16, 2014 through July 15,
2015.
Proposed 11th POD activities include:
1. Evaluate the results of hydraulic fracture simulations on wells BI -18A and 131-38.
2. Drill two high angle Brookian Sands development wells
3. Significant preventative maintenance and repairs to the plant and facility
4
9. Status of Well Shut-in for 365 Days or More (20 AAC 25.115)
The following wells were shut-in for all of 2014.
Badami Shut-in Wells 2014
Name
Date Shut-in
Reason for Well
Shut-in (1)
Current Mechanical
Condition of Well (2)
Future Utility Plans
& Possibilities (3)
Comments
B1-25
July 2003
D. Mechanical
Collapsed tubing and casing at
D. Long term shut-in
Problem
4504' MD. Halliburton 9-5/8"
well/No immediate
Fast drill @2450' MD w/ 50'
plans
Arctic Set Cement and 9-5/8"
Halliburton EZSV @ 2347'
MD w/ 50' of Arctic Set
Cement above plug.
5
APPENDICES
Table 1: Badami Well Disposition — As of December 31, 2014
Completion
Well
Date
Disposition
Comment
Bl -01
8/19/98
Class 1 Disposal Well
EPA mandated annual MIT -IA & AOGCC
Mandated annual fill tag performed April 29,
2013. Both satisfied regulatory requirements.
Producer, cased. Originally pre-
Producer 8124198 to present. Holes punched
B1 -11A
3/04/98
produced injector. Hydraulic
for POGLM 11/4/98. "No -Flow" test witnessed
fracture treatment 08/17/98.
& verbally certified as successful by AOGCC on
188,000 lbs. of sand. Xylene & Diesel
09/4/12. Formal approval letter received from
stimulation 1/25/2000, no proppant
James Regg on 10/5/12.
used.
B1-14
5/01/98
Producer, cased with installed K-
Pull MCX valve and set K -Valve to convert well
Valve,
from a gas injection well to a producer under
Sundry 313-115 on 08/19/13.
B1-15
7/31/98
Producer, tri -lateral, 8/24/98 to
Main borehole completed with slotted liner then
present.
additionally perforated 11/11/99. Two additional
legs have plop & drop slotted liners with open -hole
tie -backs to a junction window.
B1-16
6/13/98
Producer, ESP. Originally pre-
Injector 8/24/98 to 9/25/98. Producer 9126198
produced injector, cased. J-2 and
to 10/21/98. Well worked over & ESP Installed
A-5 sands stimulated 09/17/98,
in March 2012. Dedicated producerfrom
proppant employed.
5/11/12 to present. "No -Flow" certified
08/16/2013
B1 -18A
3/12/10
Producer. Sidetracked unilateral
P&A to sidetrack under Sundry 309-366.
horizontal well. Dedicated
Sidetrack PTD No. 210-003. Horizontal section
producer from November 2010 to
completed with a slotted liner & external swell
present.
packers. Tie -back with Baker Flexlock-liner hanger,
ZXP packer and external casing packer.
B1-21
1/06/98
Injector, gas. Originally a pre-
Producer 8124198 to 09/28/99. Injector
produced gas injector, hydraulic
09/29/99 to August 2005. Producer October
stimulated, but no proppant
2005 through July 2013. Running tool Fish
employed. Now in service as a gas
recovered 3/8/12. Reconversion to injector service
injection well.
under Sundry 313-362 issued 7/27/13.
Bl -25
11/20/98
Suspended Well. Unilateral, cased,
Tubing collapse confirmed 9/07/04. Well
completed with slotted liner.
suspended 4/08/05 by setting 2 CIBP in surface
casing at 2347 & 2450 feet MD with 50' Arctic Set'"
cement caps atop each.
B1-28
10/20/98
Producer, trilateral. Mother bore
Dedicated producer. Secured for TxIA
completed with a slotted liner.
communication 4/18/05. Repaired GLM and
Two additional legs have plop
passed MIT 10/08/12. Tubing & Liner plugs
and drop slotted liners with open
removed, then placed back on production
hole tie -backs.
6/21/2013.
B1-36
5/23/99
Producer, unilateral, cased. Now
Originally POP 5/30/99 and sustained through
perforated in and producing from
2 shut-in & re -start cycles. Variously produced from
Badami Sands.
Kekiktuk, Killian & Bodomi sands. Worked over under
Sundry 310-063 in March 2010. Put back on
continuous production 11/7/2010.
B1-38
2/09/10
Producer, Killian Formation;
Post drilling 10-3/4" casing leak repaired in
unilateral cased & perforated,
March 2010. Kekiktuk tested non-productive.
frac'd 7 Sept 2011, no proppant.
Dedicated Killian producer 11/16/10 to present.
Table 2: Badami Production/Injection - Surface Units
7
BADAMI PRODUCTION/ INJECTION -SURFACE UNITS
2014 PRODUCTION
Jan Feb Mar April May June July Aug Sept Oct Nov
Dec
2014 Total
Oil (stb)
37,017 33,052 32,700 32,923 34,919 32,746 32,412 31,915 31,197 32,386 30,505
30,692
392,464
Associated Gas (mscf)
21,692 19,368 19,162 19,293 20,463 19,189 18,993 18,702 18,281 18,978 17,876
17,986
229,984
Free Gas (mscf)
26,047 28,007 24,641 22,781 28,530 25,362 23,286 27,334 28,888 31,531 28,040
31,185
325,631
Water (stb)
0 0 0 0 0 0 0 0 0 0 0
0
0
2014 INJECTION
Water (stb)
0 0 0 0 0 0 0 0 0 0 0
0
0
Gas (mscf)
0 0 0 0 0 0 98 398 734 862 1,046
743
3,881
Notes:
(1) Per a discussion between Jack Hartz and Anna Dube on 322/00, a solution GOR of 586 was determined using production data
from 8/98 to 2/99 and is used in calculating volumes of associated gas. This was done to address the fact there are different
types of oil in the reservoir with different GOR.
(2) Volumes of produced water are reported here although they are not reported in other production allocations and injection reporting
due to not being of significant volume, Volumes here are based on tank levels when the water was pumped into the disposal well
and are not the actual water production for any given month.
7
Table 3: Badami Production/Injection - Reservoir Units
BADAMI PRODUCTION I INJECTION - RESERVOIR UNITS
2014 PRODUCTION
Jan Feb Mar April
May June July Aug
Sept
Oct
Nov
Dec
2014 Total
Oil (rb)
48,122 42,968 42,510 42,800
45,395 42,570 42,136 41,490
40,556
42,102
39,657
39,900
510,203
Free Gas (rb)
15,185 16,328 14,366 13,281
16,633 14,786 13,575 15,936
16,841
18,382
16,347
18,181
189,843
Water (rb)
0 0 0 0
0 0 0 0
0
0
0
0
0
All Fluids (rb)
63,308 59,295 56,876 56,081
62,028 57,356 55,711 57,425
57,398
60,484
56,004
58,081
700,046
2014 INJECTION
Water (rb)
0 0 0 0
0 0 0 0
0
0
0
0
0
Gas (rb)
0 0 0 0
0 0 57 232
428
503
610
433
2,263
All Fluids (rb)
0 0 0 0
0 0 57 232
428
503
610
433
2,263
Voidage (rb)
-63,308 -59,295 -56,876 -56,081
-62,028 -57,356 -55,654 -57,193
-56,970
-59,982
-55,394
-57,648 -697,784
Oil Formation Volume Factor, Bo
1.300 rb/stb
Gas Formation Volume Factor, Bg
0.00058 rb/scf
0.00328 vol/vol
Water Formation Volume Factor, Bw
1.0101 rb/stb
Notes:
(1) Bo from Average of Badami #1 and Badami
#5 (lower sand) PVT analysis.
(2) Bg calculation based on gas composition of sample taken 9/1858 (reservoir temperature 185 degrees F, reservoir pressure: 6400 psi)
Table 4: 2014 Badami Pressure Monitoring
Well
Test Date
Operation
Pressure at
Datum
(psia)
Datum
(TVDSS Feet)
B1-14
3/14/14
Static Pressure
1,483
10,090
B1 -18A
4/1/14
Static Pressure
1,792
10,180
BI -36
3/31/14
Static Pressure
2,085
8,778
B1-38
4/6/14
Static Pressure
2,424
10,661
Table 5: Badami Well Testing Frequency Summary
Well
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
B1 -11A
11
0
20
84
33
0
0
0
89
36
32
17
B1-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
13
B1-15
3
0
15
43
0
0
0
4
35
13
25
19
B1-16
0
0
0
1
1
0
0
0
1
28
39
15
B1-18
1
0
18
64
19
1 0
0
0
0
0
0
1 0
Bl -18A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
12
118
33
34
17
B1-21
0
0
22
35
18
0
0
1
4
22
11
0
B1-25
8
0
0
0
0
0
0
0
0
0
0
0
B1-28
9
0
0
0
0
0
0
0
0
3
33
18
B1-36
7
0
25
90
36
0
0
20
145
45
43
50
B1-38
N/A
N/A
N/A
N/A
N/A
N/A
N/A
22
102
49
34
22
10
Figure 1: Badami Field Production History
Badami Field Oil Production
18,000
16,000
14,000
12,000
v
a
O
a
m 10,000
E
O 8.000
_T
N
0
6,000
4,000
2.000
0
82458 824x99 823)00 823101 8123ND2 823/03 822)0a 822)05 822)06 822)07 821/78 821)09 821110 821111 8.20!12 820113 820114 82Q'15 8'19'16
11
Figure 2: Badami Gas Disposition History
Badami Field Gas Disposition
30,000
25,000
20,000
a
N
m
15,000
N
A
T
R
Q 10,000
5.000
8'24.198 824;99 6'23,00 823,01 82302 8.23X3 &2204 8.22705 8/'2.106 82 20 7 871108 8121M 8(2100 821111 &2"2 8200 3 8/2011 4 8 /1011 5 811 911
6