Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2014 Swanson KGSFHilcorp Alaska, LLC
July 28, 2014
JUL 2 9 2014
Mrs. Cathy Foerster, Chair
Alaska Oil and Gas Conservation Commission OGCc
333 W. 7th Avenue, Suite 100
Anchorage, AK 99501-3539
Post Office Box 244027
Anchorage, AK 99524-4027
3800 Centerpoint Drive
Suite 100
Anchorage, AK 99503
Phone: 907/777-8300
Fax: 907/777-8301
RE: 2014 Annual Material Balance Calculations of Production and Iniection Volumes:
Kenai Gas Storage Facility #1 (KGSF#1), Swanson River Field
Dear Commissioner Foerster:
Attached for Alaska Oil and Gas Conservation Commission (AOGCC) review is the 2014 annual
material balance calculation of production and injection volumes for the Kenai Gas Storage
Facility #1 (KGSF#1), as required per Storage Injection Order #2A. This material balance
includes all primary production from the Tyonek 64-5 reservoir (via the SRU 43-28 wellbore), as
well as all storage operations from the two gas storage wells, KGSF #1 and KGSF #7A. Primary
production occurred from December 1998 through May 2001 and storage operations are on-
going since June 2001. Gas storage production and injection volumes for KGSF #1 (formerly
SRU 43-28) and KGSF #7A have been reported on a monthly basis to the state through June 30,
2014.
Pressures from the Tyonek 64-5 reservoir have been measured/estimated from both downhole
pressure buildups and from surface shut-in tubing pressures. The surface readings were then
converted to downhole pressures at a common datum of 6,369 ft TVD. These data points are
tabulated in Attachment #1 and plotted versus the net cumulative production (production less
injection) on the standard P over Z plot, shown in Attachment #2.
The P over Z plot, Attachment #2, shows that the 2013-2014 production and injection cycle
followed the primary production profile as expected. This storage reservoir continues to show
that the gas is contained within zone and is an important resource in helping meet peaking
requirements during the winter season.
If you or your staff has any questions regarding this annual report, please contact me at 777-
8441.
Sincerely,
Jason Ewing
Petroleum Engineer
Attachments:
1. Tyonek 64-5 Sand POZ Data
2. KGSF #1 Facility (Tyonek 64-5 Sand) - P/Z vs Cumulative Production Plot
ATTACHMENT #1 -- KGSF POZ DATA (64-5 Sand)
Parameter
Value
Units
Gas Gravity
0.563
3306
Bench Datum
6369
ft (tvd)
Datum Temp.
122
°F
Avg Temp.
102
-F
Primary Production
12/05/98
SITP
0
Te
Gauge
3306
0.0000
Datum
07/27/99
SITP
Wellname
Date
Test Type
Duration
Measured
Pressure at
Factor
Pressure,
Cum Gas, bcf
P/Z, Psia
0.8954
1100
1.0690
(hrs)
Test Depth
Test
MTD, psia
0
Psia
0.9353
626
1.2700
669
06/09/01
SITP
(MTD),ft
380
0.9533
441
1.3390
463
Primary Production
12/05/98
SITP
0
2850
0.8781
3306
0.0000
3765
07/27/99
SITP
0
1775
0.8529
2059
0.5610
2414
09/09/00
BHP buildup
6395
882
0.8954
1100
1.0690
1229
02/20/01
SITP
0
540
0.9353
626
1.2700
669
06/09/01
SITP
0
380
0.9533
441
1.3390
463
2001/2002 Iniection Cvcle
07/11/01
SITP
21
0
875
0.9018
1015
1.1480
1126
09/18/01
SITP
4
0
1820
0.8522
2111
0.6730
2477
09/20/01
SITP
24
0
1810
0.8524
2099
0.6780
2463
10/09/01
SITP
8
0
1980
0.8514
2297
0.5720
2698
04/05/02
SITP
15
0
2280
0.8551
2645
0.4000
3093
07/12/02
ISITP
0
2620
0.8666
3039
0.1900
3507
07/26/02
ISITP
1 0.8518
0
2630
0.8671
3050
0.2000
3518
2002/2003 Production Cycle
12/05/02
ISITP
65
0
1415
0.8643
1641
0.7400
1899
07/25/03
ISITP
0
1 224
1 0.9719
1 260
1 1.2520
1268
2003 Injection Cycle
12/29/03
ISITP
19 0
2440
0.8596
1 2829
0.2540
3291
2003/2004 Production Cycle
04/28/04
ISITP
24 1 0
1 2075
1 0.8518
1 2406 1
0.4450
2825
2004 Injection Cycle
07/14/04 ISITP 12 0 1 2565 1 0.8643 1 2974 1 0.1530 3441
12/05/04 ISITP 96 1 0 1 2865 1 0.8788 1 3322 1 -0.0820 3780
2004/2005 Production Cycle
06/08/05 ISITP 1 6 1 0 2080 1 0.8518 1 2412 0.3960 1 2832
2005 Injection Cycle
08/08/05 SITP 1 0 2828 0.8768 3279 0.0220 3740
12/30/05 SITP 72 0 2786 0.8746 3231 -0.0440 3694
2005/2006 Production Cycle
03/22/06 ISITP 1 24 1 0 1 1905 1 0.8515 1 2209 1 0.4208 1 2594
2006 Injection Cycle
07/10/06 SITP 240 0 2815 0.8761 3264 -0.0482 3726
08/14/06 SITP 456 0 2687 0.8697 3116 0.0303 3583
09/30/06 SITP 288 0 2815 0.8761 3264 -0.0678 3726
2006/2007 Production Cycle
12/04/06 ISITP 18.5 0 2665 0.8686 3090 0.0329 3557
01/10/07 ISITP 9 0 2450 0.8600 2841 0.0763 3304
03/26/07 ISITP 96 0 2231 0.8540 2587 0.2442 3029
2007 Injection Cycle
04/27/07 SITP 192 0 2828 0.8768 3279 -0.0314 3740
06/04/07 SITP 120 0 2711 0.8708 3144 0.0206 3610
09/11/07 SITP 648 0 2717 0.8711 3151 -0.0028 3617
2007/2008 Production Cycle
12/02/07 ISITP 144 1 0 2604 0.8654 1 3005 0.0284 3473