HomeMy WebLinkAbout2015 Pretty CreekHileorp Alaska, LLC
February 29, 2016
Mrs. Cathy Foerster, Chair
Alaska Oil and Gas Conservation Commission
333 W. 7th Avenue, Suite 100
Anchorage, AK 99501
Post Office Box 244027
Anchorage, AK 99524-4027
3800 Centerpoint Drive
Suite 100
Anchorage, AK 99503
Phone: 907/777-8378
Fax: 907/777-8310
Re: 2015 Annual Material Balance Calculations of Production and Iniection
Volumes
Pretty Creek Gas Storage Facility
Pretty Creek Unit #4
Dear Commissioner Foerster:
Attached for your review is the 2015 "Annual Performance Report" for the Pretty Creek
Gas Storage Facility (PCU #4), as required per AOGCC Storage Injection Order #4 (SIO
#4). This material balance report covers the primary production period through the 2015
gas storage operations.
The 51-5 gas storage reservoir was in active use for all of 2015 and was an important
component of total gas deliverability for the Cook Inlet. There is one active well that is
used for injection and production — Pretty Creek Unit #4 (aka PCU #4). Attached find
monthly injection and production data for 2015.
Hilcorp has performed material balance calculations on the 51-5 reservoir to provide
assurance of continued reservoir confinement of the gas storage volumes. Supporting
data is attached in numerical and graphical form for the convenience of the reader. As of
December 31, 2015 the estimated reservoir pressure in the 51-5 was approximately 1336
psig as estimated with a shut in tubing pressure taken on 12/22/2015. All production and
injection cycles performed in 2015 consistently match the historical P over Z trend
established by past performance of this reservoir. These data points are plotted with the
historical data and they conform to the overall curve as shown in the attached figure in
red squares.
Sincerely,
HILC RP ALASKA, LLC
er y Mardambek
Reservoir Engineer
Attachments:
1) Production and Injection Chart--- Pretty Creek Unit #4
2) 51-5 P/Z Data
3) 51-5 P/Z vs Cumulative Production Plot
Wellname
Date
Test Type
Pressure at
MTD, Asia Z Factorssure,
TDaturn
aPCU
Cum Gas, bcf
P/Z, Psia
4 51-5
01/01/15
SITP
1489 0.86661489
0.1925
1719
PCU 4 51-5
02/21/15
SITP
1451 0.8688
1451
0.2288
1670
PCU 4 51-5
03/01/15
SITP
1451 0.8688
1451
0.2288
1670
PCU 4 51-5
04/11/15
SITP
1456 0.8685
1456
0.2288
1677
PCU 4 51-5
05/11/15
SITP
1361 0.8743
1361
0.3506
1557
PCU 4 51-5
06/23/15
SITP
1437 0.8696
1437
0.2853
1653
PCU 4 51-5
07/29/15
SITP
1425 0.8703
1425
0.2950
1638
PCU 4 51-5
08/16/15
SITP
1407 0.8715
1407
0.3196
1614
PCU 4 51-5
09/01/15
SITP
1415 0.8709
1415
0.3174
1625
PCU 4 51-5
12/08/15
SITP
1300 0.8783
1300
0.4889
1480
PCU 4 51-5
12/22/15
SITP
1336 0.8759 1
1336 1
0.4601 1
1525
m
O O O O O O- O O O O
O O O O O O O O O O
O O O O O O O O O
0 00 tC Cr N N lD 00
(dj:)SW) aleU uoil:)aful/uoil:)npoad SZOZ
Ul �
U N W W W d N W j
p V V U U U V U U U T V U
v c v c v v c v c u a
v o c o c o c o c o c c o c o c >
o =� o� o� o- o o o o o
� l\p 00 00 Ol 01 O O ti N N N M M � C ul �
' O O O O O O O O O O O O O O O O C
d N N N N N N N N N N N N N N N N
+
+
Lo
N
a
� o
4
0 0
Ln
14