Milne Point Unit
Waterflood and Reservoir Surveillance Report
for
Kuparuk River Oil Pool
Schrader Bluff Oil Pool
Sag River Oil Pool
January through December, 2017
Issued: March 30th, 2018
Sections and Exhibits
Introduction
Kuparuk River Oil Pool
Section 1: Kuparuk River Oil Pool Exhibits
Schrader Bluff Oil Pool
Section 2: Schrader Bluff Oil Pool Exhibits
Sag River Oil Pool
Section 3: Sag River Oil Pool Exhibits
Production/Injection Surveillance Logs
Section 4: Production/Injection Well Surveillance Exhibits
Shut in Well Exhibit
Section 5: Shut in Well Statuses
Milne Point Well Testing
Section 6: Well Test Exhibits
Milne Point Plan of Operations and Development
Section 7: Review of Annual Plans of Operations
1
1A
—1B
2
2A
— 2B
3
3A
— 3B
4
4A
— 4B
5
5A
6
6A
— 6C
7
7A
ANNUAL RESERVOIR SURVEILLANCE REPORTS
MILNE POINT UNIT
KUPARUK RIVER OIL POOL
SCHRADER BLUFF OIL POOL
SAG RIVER OIL POOL
JANUARY - DECEMBER 2017
Introduction
As required by Conservation Order 205 for the Kuparuk River Oil Pool, approved October 4,
1984, Conservation Order 477, approved August 23, 2002 for the Schrader Bluff Oil Pool,
Conservation Order 423 for the Sag River Oil Pool, approved May 6, 1998, and Conservation
Order 550.007 for all Milne Point Pools, approved January 6, 2009, and Conservation Order
550.006 for all Milne Point Pools, amended February 14, 2015, this report provides a
consolidated summary of surveillance activities within the Milne Point Unit. The report includes
surveillance data associated with waterflood projects and development activities. The time period
covered is January through December 2016.
Order 205, Rule 3 for the Kuparuk River Oil Pool requires the Operator to submit the
following for the previous calendar year:
a. A tabulation of reservoir pressure and injection pressure data on wells in the waterflood permit area.
b. A tabulation of all production logs, injection well surveys, and injection well performance data.
c. Produced and injected fluid (oil, gas, and water) volumes reported by month and cumulative.
Order 477, Rule 10 for the Schrader Bluff Oil Pool requires the Operator to submit the
following for the previous calendar year:
a. Progress of enhanced recovery project(s) implementation and reservoir management summary
including results of reservoir studies. (CO 283, Rule 2 Part 2)
b. Voidage balance by month of produced fluids and cumulative fluids and cumulative status for each
producing interval. (CO 283, Rule 2, Part 2)
c. Summary and analysis of reservoir pressure surveys within the pool. (CO283, Rule 2, Part 3)
d. Results, and, where appropriate, analysis of production and injection logging surveys, tracer surveys
and observation well surveys, and any other special monitoring. (CO 283, Rule 2, Part 4)
e. Review of well testing and pool production allocation factors over the prior year. (CO 477, Rule 6,
Part 2)
f. Future development plans. (New rule, CO 477)
g. Review of Annual Plan of Operations and Development. Note: A separate Plan of Development is
sent annually by October 1 as part of DNR reporting. (New rule, CO 477)
Order 423, Rule 12 for the Sag River Oil Pool requires the Operator to submit the
following for the previous calendar year:
a. Progress of enhanced recovery project implementation and reservoir management summary
including engineering and geotechnical parameters.
b. Voidage balance by month of produced fluids and injected fluids and cumulative status.
c. Analysis of reservoir pressure within the pool.
d. Results, and, where appropriate, analysis of production logging surveys, tracer surveys and
observation well surveys.
e. Review of pool allocation factors over the prior year.
f. Future development plans.
Order 550.007, Rule 2 for All Milne Point Pools requires the Operator to submit the
following for the previous calendar year:
a. A summary of the performance and operational issues relating to the Unit 5 MPFM.
b. The monthly oil, gas and water allocation factors for each Milne Point Field pool.
Order 550.006 for All Milne Point Pools requires the Operator to submit the following for
the previous calendar year:
a. A summary of all installations to date and the performance of each Gen 2 (VSRD meter).
b. All operational issues and any additional Gen 2 test results.
Each of the three producing reservoirs is reported in a separate section.
Section 1
Kuparuk River Oil Pool
List of Exhibits
Reservoir Voidage Balance
1-A
Static Pressure Data (Form 10-412) 1-B
Kuparuk River Oil Pool Waterflood
Project Summary
Exhibit 1-A shows a monthly breakdown of production and injection data for the report period.
Cumulative water injection since waterflood startup through the end of 2017 is 591.4 MMSTB
and cumulative gas injection is 103.1 BSCF.
This data shows that the voidage replacement ratio averaged 0.91 RB/RB in 2017 compared to
0.83 RB/RB in 2016. The VRR still remained under 1.0 BBL/BBL in over pressured zones in
order to reduce reservoir pressures in areas where pressure gradient exceeds that of standard
saltwater brine (-0.46 psi/ft) .
The Kuparuk River Oil Pool is split up in Hydraulic Units which represent regions of the
reservoir that are believed to be hydraulically isolated due to faulting and/or lithologic controls.
The increase in producer well count is likely a result of reactivating long term shut-in producers
previously thought as uneconomic under the previous operator. Hilcorp also utilized the smaller
ASR rig which allowed for RWO's into the summer, which was a limitation under BP's
operatorship due to the thawing/softening of pad roads during the warmer summer months.
Exhibit 1-13 presents the reservoir pressure data taken during 2017 for the Kuparuk River wells.
In 2017, 18 static pressure readings were obtained in the Kuparuk River reservoir.
Exhibit I -A Reservoir Voidage Balance Summary Kuparuk Pool
January - December 2017
Daily Production Rate Averages By Month:
Daily Injection Rate Averages By Month:
Oil
Water
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Prod Rate
Prod Rate
Prod Rate
Voidage
Inj Rate
Inj Rate
Replacement
Replacement
Balance
(stb/day)
(stb/day)
(mscf/day)
(rbbl/day)
(stb/day)
(mscf/day)
(rbbl/day)
Ratio
(rbbl/day)
1/31/2016
10,594
55,875
9,887'
74,868
66,202
4,866
71,209
0.95
-3,659
2/29/2016
10,988
57,751
11,210'
78,236
65,667
5,368
71,081
0.91
-7,155
3/31/2016
11,208
60,506
12,512
82.314
69,243
6,448
75,602
0.92
-6,713
4/30/2016
10,562
55,119
13,538
77,083
65,625
7,464
72,768
0.94
-4,315
5/31/2016
8,745
47,591
9,721
64,578
54,599
5,161
59,676
0.92
-4.903
6/30/2016
9,331
58,015
10,796
76.599
60,491
5,698
66.100
0.86
-10,499
7/31/2016
10,082
54,113
11,369
73.820
63,616
6,312
69.779
0.95
-4,041
8/31/2016
10,103
54,426
9,750
72,821
61,832
6,621
68,222
0.94
-4,599
9/30/2016
8,758
50,752
9,882
67.933
52,036
5,754
57,564
0.85
-10,369
10/3112016
9,678
57,604
10,986'
76,666
63,227
5,622
68.814
0.90
-7,853
11/3012016
9,522
55,551
10,951'
74.406
62,064
4,878
67.020
0.90
-7,386
12/31/2016
10,163
56,846
11,388
76.686
62,975
4,586
67.703
0.88
-8.983
Cumulative Production By Month:
Cumulative Injection By Month:
Oil
Water
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Cumulative
Cumulative
Cumulative
Voidage
Cumulative
Cumulative
Replacement
Replacement
Balance
(stb)
(stb)
(mscf)
(rbbl)
(stb/day)
(mscf/day)
(rbbl)
Ratio
(rbbl)
1/31/2016
328,409
1,732,111
306,493
2,320.907
2,052,253
150,834
2.207,490
0.95
-113,418
2129/2016
318,666
1,674,777
325,079
2,268,853
1,904,337
155,682
2,061,355
0.91
-207,499
3/31/2016
347,448
1,875,690
387,862
2,551,745
2,146,532
199,879
2,.343,650
0.92
-208,095
4/30/2016
316,850
1,653,577
406,136
2,312,502
1,968,761
223,918
2,183,047
0.94
-129,456
5/31/2016
271,088
1,475,329
301,337
2,001,924
1,692,555
159,982
1,849,944
0.92
-151,980
6/30/2016
279,929
1,740,458
323,883
2,297,976
1,814,739
170,940
1,983,002
0.86
-314,974
7/31/2016
312,540
1,677,510
352,428
2,288,412
1,972,101
195,676
27163,134
0.95
-125,278
8/31/2016
313,194
1,687,200
302,248
2,257,461
1,916,803
205,237
2,114,896
0.94
-142,566
9/30/2016
262,753
1,522,571
296,474
2,.037,997
1,561,088
172,619
1,726.932
0.85
-311,065
10/31/2016
300,015
1,785,733
340,574
2,376,658
1,960,030
174,277
2,133.226
0.90
-243,432
11/30/2016
285,647
1,666,542
328,538
2232.188
1,861,921
146,339
2,010,594
0.90
-221,595
12/31/2016
315,064
1,762,240
353,015
2.377.279
1,952,215
142,162
2.098.796
0.88
-278,483
Average:
2016
9.978
55,346
10.999
74,668
62.298
5.731
2.073.005
0.91
-203,987
Cumulative:
stb
stb
mscf
rb
stb
mscf
rb
rb
31 -Dec -16
3,651,604
20,253,736
4,024,067 "27,324.036
22,803,335
2,097,545
26.534.675
0 97
-789,360
Exhibit I -B Form 10-412 Kuparuk Pool
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
1. Operator; Hiloorp Alaska LIC.
12,
Address: 3800 Centerpoint Dr. Anohora v AK 99503
3. Unit or Lase Name: Milne Point
4, Field and Pool; Ku aruk River Pool
5, Datum Reference: 7000' SS
311 Gravity; API .23
7. Gas Gravity. Air ■ 1,0
B. Well Name and 9. API Number
Number; 50•XXX•XXXXX•XX
XX
10.011(0) 11. AOGCC Pool
or Gas Code
(G)
12, Final Test
Date
13. Shut -In
Time,
Hours
14. Press.
Surv, Type
(see
Instructions
for code e..
15, B,H,
Temp.
♦
16. Depth 17. Final
Tool TVDss Pressure at
Tool Depth
f.. r..
18. Datum
TVDss
(Input)
-...
19, Pressure
Gradient,
psifft.
+
20,
Pressure at
Datum (cal)
a..
Comments
Zone
.. +..
61PK 38
PROD
25i<017
168
SBHP
174
6918
11,2431
7000
0.43D
1,378
Slickline Gauge
C1B7
IAPL-36
PROD I
2'1012017
2,136 1
PP
150
5,908
2,522
7000
0.430
3,092
ESP Gauge
A3
"MPF -14
PROD
2111/2017
P.888 I
SBHP
166
6,653
2 945
7000
0.430
3,094
Slickline Gau a
A3/A2/A1
41PL-03
PROD
2120/2017
2,1841
PP
168
6,837
2.715
7000
0.430
2,785
ESP Gau a
B61A3/A2/At
1d PE -14A
PROD
3/5/2017
8,816
SBHP
188
8,711
3,017
7000
0.430
3,141
Slickline Gnua
137/136
hl PE -22
PROD
31181'x017
144
SBHP
176
8,750
1 516
7000
0.430
1,624
Slickline Gau a
C11137
1.1 PE -04
PROD
S/612017
3,912
PP
173
6,7$7
2,910
70DO
0.430
3 002
ESP Gauge
C1/B7
rd PK -05
PROD
5/1112017
143
PP
I 17D
6.735
2,515
7DD6
0.430
2 629
ESP Gau a
C11137
41PK--30
PROD 1
5/2212017
144
PP
165
6,915
2,125.
7000
0.430
2 162
ESP Gauge
C11/87
IAPL--32
INJ
5122/2017
2,328
SBHP
80
4 385
3.525
7000
0.430
4,658
Slickline Gau a
A3/A2
MPF -86
PROD
61412017
552
PP
170
6 775
2,617
7000
0.43D
2 734
ESP Gauge
A31A2/A1
MPL-33
INJ
6/7/2017
384
SBHP
108
7,070
4 105
7000
0.430
4,075
Slickline Gau a
A21A1
MPH -05
PROD
6/11/2017
384
SBHP
165
6,611
2 935
7000
D.43D
3,102
Slickline Gauge
C1187
MPF -05
PROD
6119/2017
LTSI
SBHP
162 1
6,342
'1321
7000
0,430
3,604
Slickline Gau e
A3/A2/A1
IAPB -13
INJ
6/2112017
360
SBHP
151
7.028
'11,149
7000
0,43D
3 337
Slickline Gau a
C1
M PC -04
PROD 1
71112017
266
SBHP
178
7,2 17
2 462
7000
0,430
2 369
Slickline Gau a
C1
1APL-14
PROD
711612017
960
PP
177
6,990
1.67.5.
7000
0.430
1,679
ESP Gauge
C1/B8/A31A2/A1
Id PE -10
PROD
9/13/2017
12,384
PP
170
6,771
3,225 1
7000
0.430
3,323
ESP Gauge
C1
MPL-43
PROD
9114/2017
216
PP
172
8,656
1.910 1
7000
DA30
2.058 ESP Gau a
Cl/WA31A2/A1
IAPB -21
PROD
9/15/2017
65
SBHP
175
8.986
2.048 1
7DD6
0.430
2061
Slickline Gau a
88137136
IAPKABA
INJ
9116/2017
82 1
SBHP
108
7,225
2670
7DD6
0.430
2573
Slickline Gauge
C1/137
IAPK-22
INJ
911612017
88
SBHP
131 1
71309
3,12D
7DD6
0.436
3,116
Slickline Gauge
C11
141213-10
PROD 1
9/1812017
3 DD0
SBHP
168
6,824
3.512
7000
0.430
',1.S88
Slickline Gau a
C1B7
MPF -D1
PROD
9119/2017
100
PP
173
6,782
2.232
7000
0.430
1 2,326
ESP Gauge
A3/A2A1
PA PL -D8
INJ
912012017
192
SBHP
113
7 095
4 390
7DD6
0.430
1 4,1149
Slickline Gau a
C1B61A3/A21A1
)APE -11
PROD
9/2912017
1 872
PP
175
8,704
2,78D
70130
0.43D
2,907
ESP Gauge
C1
MPR -04A
PROD
1012&2D17
LTSI
SBHP
164
6,749
2 762
7000
0,430
2,870
Slickline Gau a
C1157
61PC-45
PROD
11112'2017
lNew Well
SBHP
166
6,909,
3,279
7000
D.43D
3,318
Slickline Gauge
C1B7
h1PF--50
PROD wn since 81221
1211/2017
2,448
PP
178
7.D53
1,279
7000
0.431)
1.256
ESP Gau e
A3/A2/A1
hl PF -61
PROD 1
12122/2017
7150D
SBHP
177
6,901
2 785
7000
0.430
2.828
Slickline Gau a
B&A24A2/A1
1d PF -29
PROD
123112017
7,512
PP
178
7,103
1,823
7000
0.430
1,779
ESP Gauge
A3/A2JA1
hiPF-81
PROD
123112017
LTSI
PP
155
6,514
3 953
7000
0.43D
4,162
ESP Gauge
A31A2/A1
CAPE -19
PROD wn since 1/241
121/201 r7
8 304
PP
176
6,881
1,517
7DD0
0.430
1 'EZ8
ESP Gnu a
C1/B7
61 PK -D6
PROD
1231120/7
LTSI
PP
162
6,754,
2,511
7000
0,430
2 617
ESP Gauge
C1
Avera a
2843
21, All tests reported herein were made in accordance with the applicable rules regulations and instructions of the Alaska 011 and Gas Conservation Commission.
I hereby certify that the foregoing is true and
correct to the best of my knowledge.
Signature
Title
Reservoir Engineer
Printed Name
Almks Altkulov
Date
1/30/2018
Section 2
Schrader Bluff Oil Pool
List of Exhibits
Reservoir Voidage Balance
2-A
Static Pressure Data (Form 10-412) 2-B
Schrader Bluff Oil Pool Waterflood
Project Summary
Exhibit 2-A shows a monthly breakdown of production and injection data for the report period.
The Schrader Bluff Oil Pool oil production averaged 8.6 MSTBD for 2017 compared to 7.4
MSTBD in 2016 due to an active workover program and renewed development drilling.
The water injection rate averaged 28.9 MBWD for 2017 compared to 26.6 MBWD in 2016. The
increase is primarily attributed to new horizontal injection wells drilled at B & L -pads.
Cumulative water injection since waterflood startup through the end of 2016 is 187.8 MMSTB.
Gas injection in the Schrader began in 2006 and was discontinued after December 2008 due to
inadequate response. No gas was injected in 2009 to 2017. Cumulative gas injection through the
end of 2017 remains as it was at year-end 2008: 220 MMSCF.
During the 2017 calendar year, the cumulative under -injection remained flat at 23.6 MMRVB.
In the supported waterflood patterns, under -injection is minimal. The average voidage
replacement ratio, or VRR, for 2017 was 1.00.
Future development plans for the Schrader Bluff oil pool include continued expansion into
undeveloped areas in the North West area of the pool via F, L , and the soon to be completed
Moose Pad which will include the development of the Nb, Ne, Oa , and Ob sands. Northwest
expansion in the Schrader Bluff reservoir began with L -pad drilling towards the end of 2016
which targeted Schrader OA sands. In late 2017 three horizontal wells were drilled in the
Schrader Nb sand (2 prod / 1 inj) from L Pad. These wells will be part of a polymer flood pilot
beginning mid 2018. Additional development is planned in the F&L pad areas throughout 2018
via a 5 well Schrader Oa sand pattern development from F pad, expansion of the L Pad Schrader
Nb pattern drilled in 2017 with 3 additional wells. An additional polymer pilot will begin mid
2018 targeting the 4 horizontal well J Pad Nb pattern drilled in 2016. Additional development
info can be found in the attached Plan of Development Review slides in Section 7.
Exhibit 2-13 presents the reservoir pressure data for the Schrader Bluff wells taken during 2017.
In 2017, 32 static pressures were obtained.
Exhibit 2-A Reservoir Voidage Balance Summary Schrader Bluff Pool
January - December 2017
Production Rate Averages:
Injection Rate Averages:
Oil
Water
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Prod Rate
Prod Rate
Prod Rate
Voidage
Inj Rate
Inj Rate
Replacement
Replacement
Balance
(stb/day)
(stb/day)
(mscf/day)
(rbbl/day)
(stb/day)
(mscf/day)
(rbbl/day)
Ratio
(rbbl/day)
1/31/2017
7, 914
16,772
1,835
25,829
28,013
0
28,293
1.10
2,464
2/28/2017
7,545
16,573
2,087
25,690
28,690
0
28,977
1.13
3,287
3/31/2017
9,039
16,932
3,498
29,236
29,794
0
30,092
1.03
857
4/30/2017
9,863
17,121
3,089
29,504
29,725
0
30,023
1.02
518
5/31/2017
8,801
17,313
3,625
29,610
27,204
0
27,476
0.93
-2,134
6/30/2017
9,446
20,369
3,147r
32,534
32,135
0
32,456
1.00
-78
7/31/2017
9,250
19,739
2,805 '
31,259
31,972
0
32,291
1.03
1,032
8/31/2017
8,777
20,934
4,077
33,886
29,263
0
29,556
0.87
-4,330
9/30/2017
8,216
19,535
2,658
30,022
28,263
0
28,545
0.95
-1,477
10/31/2017
8,126
19,297
2,562
29,575
29,511
0
29,806
1.01
231
11/30/2017
7,547
15,878
2,271 '
25,250
25,330
0
25,583
1.01
333
12/31/2017
8,736
16,399
2,201
26,624
27,301
0
27,574
1.04
950
Cumulative Production:
Cumulative Injection:
Oil
Water '
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Cumulative
Cumulative
Cumulative
Voidage
Cumulative
Cumulative
Replacement
Replacement
Balance
(stb)
(stb)
(mscf)
(rbbl)
(stb/day)
(mscf/day)
(rbbl)
Ratio
(rbbl)
1/31/2017
245,324
519,932
56,894
800,708
868,408
0
877,092
1.10
76,384
2/28/2017
211,261
464,032
58,440
719,325
803,333
0
811,366
1.13
92,041
3/31/2017
280,208
524,905
108,450
906,304
923,622
0
932,858
1.03
26,554
4/30/2017
295,900
513,639
92,674
885,133
891,763
0
900,681
1.02
15,548
5/31/2017
272,816
536,710
112,390
917,909
843,310
0
851,743
0.93
-66,166
6/30/2017
283,392
611,058
94,397
976,005
964,039
0
973,679
1.00
-2,326
7/31/2017
286,756
611,895
86,960
969,024
991,117
0
1,001,028
1.03
32,004
8/31/2017
272,073
648,965
126,385
1,050,461
907,154
0
916,226
0.87
-134,235
9/30/2017
246,469
586,041
79,747
900,665
847,876
0
856,355
0.95
-44,310
10/31/2017
251,919
598,218
79,414
916,831
914,842
0
923,990
1.01
7,160
11/30/2017
226,423
476,330
68,124
757,489
759,888
0
767,487
1.01
9,998
12/31/2017
270,806
508,380
68,239
825,342
846,321
0
854,784
1.04
29,443
Average:
2017
8,605
18,072
2,821
29,085
28,933
0
29,223
1.00
138
Cumulative:
stb
stb
mscf
rb
stb
mscf
rb
rb
31 -Dec -17
3,143, 347
6,600,104
1,032,114 '
10, 517,168
10, 561, 673
0
10, 772, 906
1.02
255,739
Rvhihit ?-R Form 10-412 Schrader Bluff Pool
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
1. Operator: Hlcorp Alaska, LLC.
2. Address: 3800 Centerpoint Dr. Anchorage, AK 99503
3. Unit or Lease Name: Mine Point
4. Field and Pool: Schrader BluffPool
5. Datum Reference: 4000' SS
6. Oil Gravity: AR = 14 -22
7. Gas Gravity: Air = 0.65
8. Well Name and
Number:
9. AR Number
50-XXX-XXXXX-XX-XX
10. Oil (0) or Gas 11. AOGCC 12. Final Test
(G) Pool Code Date
13, Shut -In
Time, Flours
V -
14. Press.
Surv. Type
is
instruction
15. B.H.
Ter p.
16. Depth
Tool TVDss
I
17. Final
Pressure at
Tool Depth
I
18. Datum 19. Pressure Gradient, psilft. jDatum
TVDss
(input)
Comments
Zone
MPB-32
50-500-29235-70-00
PROD
525140
3/16/2017
New Well
PP
86
4,178
1,937
4,000
0.400
Downhole Tbg Gauge
NC
MPI -12
50-500-29230-38-00
PROD
525140
5/11/2017
860
PP
71
3,558
1,372
4,000
0.400
,Downhole
TbgGauge
OA/OB
MPS -12
50-500-29231-39-00
PROD
525140
5/21/2017
144
PP
79
4,054
1,155
4,000
0.400
1,133
Press Gauge
OA/OB
MPI -04A
50-500-29220-08-01
PROD
525140 1
6/18/2017
1,944
PP
80
3,740
1,233
4,000
0.400
1,337
ESP Gauge
N/OA/OB
MPI -14
50-500-29232-14.00
PROD
525140
6/20/2017
140
PP
81
3,660
1,116
4,000
0.400
1,252
ESP Gauge
NB/OA/OB
MPL-46
50-500-29235-51-00
PROD
525140
7/20/2017
720
PP
72
3,384
1,345
4,000 1
0.400
1,591
ESP Gauge
OA
MPI -19
50-500-29232-18-00
PROD
525140
8/14/2017
1,800
PP
83
3,844
1,250
4,000
0.400
1,312
ESP Gauge
OA/OB
MPE-32
50-500-29232-61-00
PROD
525140
9/15/2017
64
PP
95
4,333
1,268
4,000
0.400
1,135
ESP Gauge
MPI -15
50-500-29231-06-00
PROD
525140
10/7/2017
5,832
PP
68
3,387
1,181
4,000
0.400
1,426
ESP Gauge
OA/OB
MPG -02
50-500-29219-26-00
PROD
525140
11/4/2017
840
PP
84
1,232
3,720
4,000
0.400
4,827
ESP Gauge
NA/NB/NC
MPS -15
50-500-29230-61-00
INJ
525140
11/13/2017
120
SBHP
78
4,347
2,850
4,000
0.400
2,711
Slickline Gauge
MPS -23
50-500-29230-98-00
PROD
525140
11/13/2017
106
SBHP
86
4,044
1,245
4,000
0.400
1,227
Slickline Gauge
MPH -19
50-500-29233-71-00
PROD
525140
11/14/2017
LTSI
PP
80
3,987
1,724
4,000
0.400
1,729
Downhole Gauge
OA/OB
MPS-26SS
50-500-29231-50-81
INJ
525140
11/19/2017
216
SBHP
88
4,078
2,082
4,000 1
0.400
2,051
Slickline Gauge
MPS-26LS
50-500-29231-50-80
INJ
525140
11/19/2017
216
SBHP
85
4,018
2,083
4,000
0.400
2,076
Slickline Gauge
MPS-13SS
50-500.29230-93-80
INJ
525140
11/20/2017
336
SBHP
86
4,144
2,142
4,000
0.400
2,084
Slickline Gauge
MPS-13LS
50-500-29230-93-80
INJ
525140
11/20/2017
336
SBHP
93
4,169
2,129
4,000
0.400
2,061
ISlickline Gauge
MPS -33A
50-500-29231-23-01
INJ
525140
11/24/2017
408
SBHP 1
76
4,090
1,713
4,000
0.400
1,677
ISlickline Gauge
MPI -16
50-500-29232-21-00
INJ
525140
1 11/25/2017
1,992
SBHP
93
3,914
2,328
4,000
0.400
2,362
Slickline Gauge
MPL-53
50-500-29235.86-00
PROD
525140
11/29/2017
New Well
PP
60
2,947
1,367
4,000
0.400
1,788
ESP Gauge
NB
MPS -05
50500-29231-00-00
PROD
525140
12/20/2017
53
PP
3,993
1,131
4,000
0.400
1,134
Downhole Gauge
MPL-51
50-500-29235-87-00
PROD
525140
12/27/2017
New Well
PP
69
3,359
1,558 1
4,000
0.400
1,814
ESP Gauge
NB
MPJ -08A
50500-29224-97-01
PROD
525140
12/31/2017
3,552
PP
80
3,758
1,398
4,000
0.400
1,495
ESP Gauge
OB
MPJ -09A
50-500-29224-95-01
PROD
525140
12/31/2017
1,872
PP
78
3,671
1,408
4,000
0.400
1,540
ESP Gauge
MPG -08A
50-500-29221-41-01
PROD
525140
12/31/2017
3,432
PP
76
3,357
1,352
4,000
0.400
1,609
ESP Gauge
NA/NB/NC/NE/OA/OB
MPE-15
50-500-29225-28-00
PROD
525140
12/31/2017
3,456
PP
86
4,120
1,914
4,000
0.400
1,866
JESP Gauge
NB/NC/OA
MPI -17
50-500.29232-12-00
PROD
525140
12/31/2017
1,440
PP
75
3,853
1,278
4,000
0.400
1,337
ESP Gauge
NB/OA/OB
MPS -24
50-500-29231-42-00
PROD
525140
12/31/2017
LTSI
PP
76
3,955
1,515
4,000
0.400
1,533
Downhole Gauge
NB
MPG -15
50-500-29227-84-00
PROD
525140
12/31/2017
LTSI
PP
84
3,911
1,828
4,000
0.400
1,864
ESP Gauge
NB/NC/OA/OB
MPI -18
50-500-29234-61-00
INJ
525140
12/31/2017
1,344
PP
86
3,727
2,010
4,000
0.400
2,119
Downhole Gauge
NB
MPI -18
50-500-29234-61-00
INJ
525140
12/31/2017
1,344
PP
89
3,864
2,076
4,000
0.400
2,130
Downhole Gauge
OA
MPI -18
50-500-29234-61-00
INJ
525140
12/31/2017
1,344
PP
92
3,954
2,114
4,000
0.400
2,132
Downhole Gauge
OB
Average
1,792
21. All tests reported herein were made in accordance
with the applicable rules, regulations and
instructions of the Alaska Oil and Gas Conservation
Conrrission.
I hereby certify that the foregoing
is true and
correct to the best of my know ledge.
Signature
Tele
Reserwir Engineer
Printed Name
Reid Edwards
Date
3/29/2018
Section 3
Sag River Oil Pool
List of Exhibits
Reservoir Voidage Balance
Static Pressure Data (Form 10-412) 3-B
Sag River Oil Pool Waterflood
Project Summary
Exhibit 3-A shows a monthly breakdown of production and injection data for the report period.
A Participating Area for the Sag was approved in 2005. During 2017, two new Sag wells, MPC -
46 and MPB-30 were completed in July and November, respectively, bringing the field total to 6
production, and no active injection wells.
There was no production from the reservoir in most of 1999 and the entire year of 2000 because
it was not economical to repair the failed ESPs. At the end of 2000, one well (MPC -23) was
converted to a jet pump completion. In 2001, one well (MPF -33A) was side-tracked and
completed with a jet pump completion and another well (MPF -73A) was deepened from an idle
Kuparuk well into the Sag River reservoir as an injector. One producing well (MPC -23) was
shut in for integrity reasons in 2002 and the injection well (MPF -73A) was changed to water
service only in 2006 due to tubing to inner annulus communication on gas injection.
MPK-33 was cycled between Kuparuk and Sag production throughout 2017, and both new Sag
wells, MPC -46 and MPB-30 were completed with fracture stimulation treatments.
The Sag River Pool oil production averaged 840 STBD (average GOR of 1,365 SCF/BBL), and
water production averaged 826 STBD in 2017. Cumulative production through the end of 2017 is
4.26 MMSTB of oil, 3.49 BSCF of gas, and 2.76 MMSTB of water. The average Sag production
rate in 2016 was 423 STBD. The significant increase in 2017 was likely due to two new wells
early high production.
Exhibit 3-C presents the reservoir pressure data for the Sag River wells taken during 2017. Four
pressure surveys were obtained.
Exhibit 3-A Reservoir Voidage Balance Summary Sag River Pool
January - December 2017
Production Rate Averages:
Injection Rate Averages:
oil
Water
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Prod Rate
Prod Rate
Prod Rate
Voidage
Inj Rate
Inj Rate
Replacement
Replacement
Balance
(stb/day)
(stb/day)
(mscf/day)
(rbbl/day)
(stb/day)
(mscf/day)
(rbbl/day)
Ratio
(rbbl/day)
1/31/2016
439
394
3,001
2,677
0
0 0
0.00
-2.677
2/29/2016
701
354
1,783
2,.170
0
0 0
0.00
-2,170
3/31/2016
740
387
707
1,591
0
0 0
0.00
-1,591
4/30/2016
781
468
772
1,755
0
0 0
0.00
-1.755
5/31/2016
583
416
644
1.420
0
0 0
0.00
-1,420
6/30/2016
838
943
907
2,380
0
0 0
0.00
-2,380
7/31/2016
964
894
1,318
2,710
0
0 0
0.00
-2,710
8/31/2016
1,415
1,117
2,201
3,940
0
0 0
0.00
-3.940
9/30/2016
1,089
1,069
1,882
3,361
0
0 0
0.00
-1361
10/31/2016
934
1,178
1,695
3,198
0
0 0
0.00
-3,198
11/30/2016
638
1,324
1,299
3,007
0
0 0
0.00
-3,007
12/31/2016
755
1,368
1,167
2.006
0
0 0
0.00
-2.886
Cumulative Production:
Cumulative Injection:
Oil
Water
Gas
Reservoir
Water
Gas
Voidage
Voidage
Voidage
Month
Cumulative
Cumulative
Cumulative
Voidage
Cumulative
Cumulative
Replacement
Replacement
Balance
(stb)
(stb)
(mscf
(rbbl)
(stb/day)
(mscf/day)
(rbbl)
Ratio
(rbbl)
1131/2016
13,603
12,218
93,025
82,996
0
0 0
0.00
-82,996
2/29/2016
20,338
10,265
51,717
62.919
0
0 0
0.00
-62,919
3/31/2016
22,942
12,010
21,907
49,309
0
0 0
0.00
-49,309
4/30/2016
23,431
14,050
23,162
52,658
0
0 0
0.00
-52,6.58
5131/2016
18,083
12,909
19,957
44,009
0
0 0
0.00
-44,009
6/30/2016
25,134
28,295
27,202
71.403
0
0 0
0.00
-71,403
7/31/2016
29,894
27,706
40,863
84.023
0
0 0
0.00
-84,023
8/31/2016
43,850
34,620
68,227
122,135
0
0 0
0.00
-122,135
9/30/2016
32,680
32,079
58,445
100,823
0
0 0
0.00
-100,823
10/31/2016
28,957
36,524
52,556
99,140
0
0 0
0.00
-99,140
11/30/2016
25,130
39,729
38,969
90.201
0
0 0
0.00
-90,201
12/31/2016
23,416
42,419
36,166
09.469
0
0 0
0.00
-89,469
Average:
2016
840
826
1.448
2.591
0
0
0
0.00
-2,591
Cumulative:
stb
stb
mscf
rb
stb
mscf
rb
rb
31 -Dec -16
307,459
302,825
530,196
1,035,007
0
0
0
0.00
-1.035,007
Fxhih;r ;-R Form 10-412 Sag River Pool
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RESERVOIR PRESSURE REPORT
'.1. Operator: Hilcorp Alaska, LLC.
2. Address: 3800 centerpoint Dr. Anchorage, AK 99503
3. Unit or Lease Name: Milne Point
4. Field and Pool: Sag River 011 Pool 5. Datum Reference: 8750'S' 6, Oil Gravity: API - 34
7. Gas Gravl
: Air =.65
8. Well Name 9. API Number s0-)ocx-xyxxX-70(-RX 10.011(0) or Gas 11. AOGCC 12. Final Test 13, Shut -In Time, 14. Press. 15. B.H. 16. Depth Tool 17. Final
and Number: (G) Pool Code Date Hours Surv. Type Temp. TVDss Observed
(see Pressure at
Instructions Tool Depth
for codes)
18. Datum TVDss
(Input)
19.
Pressure
Gradient,
psOh.
20. Pressure at
Datum (cal)
Comments Zone Code
MPS -90 50-029-23276-00-00
PROD 1/21/2017 216 PP 219 8 507 3,770
8 750
U10
3,845
DH Press Gau e
!MPC -15A
PROD 3/1/2017 432 PP 170 6,613 1,850
8,750
0.310
2,512
Press Gauge
MPB-30
PROD 512012017 New Well PP 223 8,718 4,050
8,750
0.310
4,060
DH Press Gauge
MPC -46
PROD 8/27/2017 120 PP 223 8,494 2,540
8,750
0.310
2,619
DH Press Gauge
age
3,473
21. Ail tests reported herein were made in accordance wllh the applicable rules regulations and Instructions ofthe Alaska Oil and Gas Conservation Commission.
I here qy certify that the foregoing is true and cortectto the bestofmy knowledge.
Signature
Title
Reservoir Engineer
Printed Name
Almas Altkulov
Date
3/30/2017
Section 4
Production/Injection Well Surveillance
List of Exhibits
Milne Point Kuparuk Surveillance
1/1/2017 — 12/31/2017
4-A
Milne Point Schrader Surveillance 1/1/2017 —12/31/2017 4-13
Production/Injection Well Surveillance
As per Conservation Order 205 (Kuparuk River Oil Pool) and Order 477 (Schrader Bluff Oil
Pool), the Milne Point Operator runs injection surveys on at least one third of the existing online
multiple zone injectors annually and on new multiple zone injectors. In 2012 AOGCC verified
that for Milne Schrader these surveys would only apply to online unregulated injectors.
There were 24 existing Kuparuk multi -zone injectors in 2017.Five of 24 multi -zone injectors
cannot be used for IPROF's due to mechanical issues. Seven injection surveys were obtained in
2017. All of these injection surveys were performed in multi -zone injectors. There were 18
existing unregulated Schrader Bluff multi -zone injectors in 2017, seven of which were shut in all
year. Injection surveys were run in 3 of the 11 online unregulated Schrader Bluff multi -zone
injectors.
Since the majority of producers at Milne Point are completed with ESPs or jet pumps which
preclude logging below the pump while on production, few production logs are run. No
production logs were run in Kuparuk or Schrader wells in 2017.
Exhibits 5-A & 5-13 are a summary of the Milne Point field well surveillance performed in 2017
on both Schrader and Kuparuk Pools.
Exhibit 4-A Production/Injection 2017 Logging & Surveillance Kuparuk River Pool
Well Name
Reservoir
Well Type
Rec Date
Log Type
Field Analysis
Final Determination
0% C, 0% A3,100% A2.
Data suggests injecting fluid is
Agree With field
traveling futher downhole into
interpreation. Stop
MPC -06
KUP
WINJ
10/22/2017
STPAPROF
lower portion of the A2 Sands
count inconclusive.
Aprox 15%flow reduction in B/C
27% BIC sands, 37%
MPC -10
KUP
WINJ
12/6/2017
STPAPROF
sands.
A3,36% A2
Data suggests injecting fluid is
traveling futher downhole into the
0%C, 0%B, 100%A3
MPC -19
KUP
WINJ
10/23/2017
STPAPROF
0 A3
Agree with field interpretation
0% C, 3% B, 49% A3/A2,
MPF -89
KUP
WINJ
12/21/2017
STPAPROF
47% All
It appears the majority of fluid is
0% B, 100% A31A2
into the perts @ 9426'-9490'
sands. Agree with field
IVIPJ-11
KUP
WINJ
9125/2017
STPAPROF
interpretation.
interpretation.
It appears the majority of fluid is
100% C, 0% B. Agree
MPK-18A
KUP
WINJ
9/21/2017
STPAPROF
going into the C sand.
with field interpretation
The data inconclusive
There appears to be a possible
too low flow rate for
casing leak at 12100'.
spinner to see the
IYIPL-24
KUP
WINJ
10/2/2017
STPAPROF
splits.
Exhibit 4-B Production/Injection 2017 Logging & Surveillance Schrader Bluff Pool
Well Name
Reservoir
Well Type
Rec Date
Log Type
Field Analysis
Final Determination
Nb - 57%, Nc - 0%,
Majority of fluid loss in Nb and
Ne - 0%, Oa - 22%,
G-01
SBL
INJ
815/2017
STPAPROF
Ob sands
Ob - 22%
Spinners clogged with schmoo,
no spinner data available.
Temperature indicates injection
Nb - 33% , Oa - 33%,
G-10
SBL
INJ
11/15/2017
STP/IPROF
down to bototm Ob sand
Ob - 33%
Spinners clogged with schmoo,
Nb - 31%, Oa - 69%,
J-15
SBL
INJ
12129/2017,
STP/IPROF
limited spinner data available
Ob - 0%
Section 5
Shut in Well Status
List of Exhibits
Milne Point Shut in Well Status 1/1/2017 —12/31/2017 5-A (to be
discussed in May meeting)
Exhibit 6-A Well Test Summary Milne Point Unit
Section 6
Milne Point Well Testing with ASRC Unit 5 and
Weatherford Gen 2 (VSRD) Summary
List of Exhibits
Summary of Milne Point Welltesting and Gen 2 (VSRD) Installations 6-A
Well Test Allocation Factors
MI i
Well Test Frequency 6-C
Exhibit 6-A Well Test Summary Milne Point Unit
Milne Point Well Testing
Milne Point primarily utilizes on -pad separators for well testing. The pad separators at B, C, E, F,
H, K and L -Pads employ volumetric, vessel -based gas-liquid separation. Separators at I and J -
Pads employ centrifugal separation, while the separators at G and S -Pads are multiphase meters,
aka Alpha "VSRD" (Venturi, Sonar, Red Eye, and Densitometer). Thus, a variety of metering
technologies are employed across Milne Point including:
- Turbine positive -displacement, Micro Motion coriolis meters or Venturi/Sonar meters for
liquid flow rate.
- Phase Dynamics or Red Eye watercut meters on the separator liquid legs.
- Turbine, Micro Motion coriolis meters or densitometers for gas flow rate.
Wells are automatically routed into test on a rolling schedule, such that a well is always being
tested on every pad with in-place testing facilities. Test duration is at least 6 hours, not including
the necessary purge time to flush the lines and vessel.
Exhibit 6-A provides information on the well tests conducted for consideration in production
allocation during 2017.
The services of portable test separators, provided by contractors ASRC and PTS, are utilized on
an ad-hoc basis whenever there are concerns about individual pad separators or to verify readings
from the fixed pad separators.
At Milne Point, Weatherford multiphase meters, aka Alpha VSRD (Venturi, Sonar, Red Eye,
Densitometer), were installed at G and S and B -Pads in 2009, 2011 and 2013, respectively. For
the 2017 year, all G -Pad and S -Pad wells were allocated from the VSRD well tests. B -Pad
allocations were made via VSRD through March 2017, then from a traditional test separator
thereafter. Due to frequent meter maintenance, a plan to replace the G -Pad VSRD with a
traditional separator is being explored in 2018.
Milne Point operators review well test quality on a daily basis and work with engineers and field
technicians to get meters fixed when needed.
I and J pads currently use Kvaerner-Hydrocyclone separators. The separators have had issues
with accurate testing as a result of oversized gas and gross fluid Coriolis meters. The gas meters
were downsized and control valves rebuilt during 2016. This enabled many of the wells to be
allocated with the permanent separators. Prior to 2017, Portable Test Units (ASRC and PTS)
were utilized to assess permanent unit performance and for some well test allocations. In 2017,
no Portable Test Units were used.
ASRC Unit #5 Operational and Performance Issues
ASRC Unit 5 is a portable well test unit that uses FMC Technologies Enhanced Multiphase
System (EMS) to measure well production. The EMS is comprised of a venturi meter and
capacitance and conductance electrodes coupled with a cyclonic pre -separator allowing partial
Exhibit 6-A Well Test Summary Milne Point Unit
separation and metering in high gas volume fraction wells. The unit was used at the Milne Point
Field throughout 2008 under temporary AOGCC approval and approved for permanent use at
Milne Point on December 30, 2008.
ASRC Unit 5 underwent a trial period in early 2008 where piggy back testing was conducted
with an established gravity test separator, ASRC Unit 1. The resulting test data from Unit 5 was
compared to Unit 1 tests, manual fluid samples and historic field well tests. In this way, it was
determined that Unit 5 measures total liquid volume within f 10% and water cut with an
uncertainty band of ±2.5 to 5%.
Following the trial period, Unit 5 was accepted as a full time portable test separator at Milne
Point, and it began autonomous testing across the field. Work is ongoing with ASRC to continue
to improve the accuracy of Unit 5 with a focus on metering gross fluid rates, water cuts and gas
volumes.
Exhibit 6-B Well Test Frequency - By Pad/Oil Pool Milne Point Unit
6B - Well Test allocation factors by month
Prod
alloc
Oil
Factor
Gas
Factor
Water
Factor
01/31/2017
0.827
0.978
1.000
02/28/2017
0.831
1.108
1.041
03/31/2017
0.862
1.102
1.038
04/30/2017
0.877
1.152
0.987
05/31/2017
0.807
1.330
0.965
06/30/2017
0.831
1.110
1.026
07/31/2017
0.853
1.085
0.982
08/31/2017
0.842
0.975
0.979
09/30/2017
0.833
1.021
1.050
10/31/2017
0.819
1.066
1.076
11/30/2017
0.807
1.019
1.072
12/31/2017
0.828
0.979
1.074
2017 Well tests by
Pad Name
Avg.
Tests
Per
Month
MPU Pad B General
7.96
MPU Pad C General
10.72
MPU Pad E General
6.93
MPU Pad F General
5.67
MPU Pad G General
12.70
MPU Pad H General
6.46
MPU Pad I General
11.87
MPU Pad J General
7.60
MPU Pad K General
10.11
MPU Pad L General
6.59
MPU Pad S General
7.99
MPU Kuparuk PA (MLNE)
MPU Sag ADL 25516 (MP17)
MPU Sag ADL 380109 (MP18)
MPU Sag ADL 47434 (MP16)
MPU Sag 8-030 ADL 47437
MPU Sag/Und ADL 375132 (MP03)
MPU Schrader Bluff PA (SCHR)
10.72
6.65'
4.47
6.60
3.35
8.15
12.70
Exhibit 6-C Well Test Frequency - By Well Kuparuk Oil Pool
Average Well Tests Report
Start: 01/01/2017 End: 12/31/2017
North Slope Milne Point
MP B-09
MPU Kuparuk PA (IALNE)
359
82
6.97
1,113 B-10
MPU Kuparuk PA (MLNE)
203
53
7.96
Mp B-15
MPU Kuparuk PA (MLNE)
356
82
7.03
LIP B-16
MPU Kuparuk PA (MLNE)
362
78
6.57
MP B-21
MPU Kuparuk PA (MLNE)
358
45
3.83
IAP B -22A
MPU Kuparuk PA (h1LNE)
361
47
3.97
MP B-28
MPU Schrader Bluff PA ( SCHR)
364
82
6.87
MP B-30
MPU Sag ADL 47437(MP19)
319
35
3.35
MP B-32
MPU Schrader Bluff PA (SCHR)
218
36
5.04
i IAP C-01
MPU Kuparuk PA (MLNE)
364
92
7.71
MP C-03
MPU Kuparuk PA (MLNE)
365
93
7.77
1,113 C-04
MPU Kuparuk PA (MLNE)
355
81
6.96
:IAP C -OSA
Ir1PU Kuparuk PA (MLNE)
37
13
10.72
MP C-07
MPU Kuparuk PA (MLNE)
364
78
6.54
MP C-09
MPU Kuparuk PA (IALNE)
365
76
6.35
IAP C-13
MPU Kuparuk PA (MLNE)
363
79
6.64
MP C-14
MPU Kuparuk PA (MLNE)
356
73
6.25
IAP C-1 5A
MPU Sag ADL 25516 (MP17)
335
73
6.65
MP C-21
MPU Kuparuk PA (IALNE)
166
43
7.90
FAP C -22A
MPU Kuparuk PA (MLNE)
360
84
7.12
j FAP C-23
MPU Sag ADL 47434 (MP16)
365
79
6.60
j IAP C -24A
MPU Kuparuk PA (MLNE)
365
79
6.60
"IAP C-26
MPU Kuparuk PA (MLNE)
364
70
5.87
MP C-40
MPU Kuparuk PA (MLNE)
365
76
6.35
;FAP C-43
IVIPU Kuparuk PA (MLNE)
365
84
7.02
IAP C-45
MPU Kuparuk PA (MLNE)
352
10
0.87
1.1P C-46
MPU Sag ADL 25516(MP17)
338
38
3.43
IAP E-04
MPU Kuparuk PA (MLNE)
235
37
4.80
MP E-06
MPU Kuparuk PA (MLNE)
355
59
5.07
MP E-09
MPU Kuparuk PA (MLNE)
85
18
6.46
FAP E-11
MPU Kuparuk PA (MLNE)
191
36
5.75
LIP E -14A
MPU Kuparuk PA (MLNE)
241
48
6.07
MP E-15
IAPU Kuparuk PA (IALNE)
0
1
0.00
MP E-18
MPU Kuparuk PA (MLNE)
360
67
5.68
Exhibit 6-C Well Test Summary Milne Point Unit
MP E-19
MPU Kuparuk PA (MLNE)
22
5
6.93
MP E -20A
MPU Schrader Bluff PA ( SCHR)
364
76
6.37
MP E-22
MPU Kuparuk PA (MLNE)
301
62
628
MP E -24A
MPU Schrader Bluff PA ( SCHR)
359
66
5.61
MP E-31
MPU Schrader Bluff PA ( SCHR)
365
70
5.85
MP E-32
MPU Schrader Bluff PA ( SCHR)
364
74
6.20
MP F-01
MPU Kuparuk PA (MLNE)
315
51
4.94
MP F-06
MPU Kuparuk PA (MLNE)
355
54
4.64
MP F-09
MPU Kuparuk PA (MLNE)
355
55
4.73
MP F-14
MPU Kuparuk PA (MLNE)
315
48
4.65
MP F-18
MPU Kuparuk PA (MLNE)
358
54
4.60
MP F-22
MPU Kuparuk PA (MLNE)
360
55
4.66
MP F-25
MPU Kuparuk PA (MLNE)
362
55
4.63
MP F-29
MPU Kuparuk PA (MLNE)
53
5
2.88
MP F-34
MPU Kuparuk PA (MLNE)
361
54
4.56
MP F-37
MPU Kuparuk PA (MLNE)
360
53
4.49
MP F-38
MPU Kuparuk PA (MLNE)
355
32
2.75
MP F-45
MPU Kuparuk PA (MLNE)
360
56
4.74
MP F-50
MPU Kuparuk PA (MLNE)
245
39
4.86
MP F -53A
MPU Kuparuk PA (MLNE)
357
51
4.36
MP F-54
MPU Kuparuk PA (MLNE)
361
57
4.82
MP F -57A
MPU Kuparuk PA (MLNE)
361
53
4.48
MP F-61
MPU Kuparuk PA (MLNE)
43
8
5.67
MP F-65
MPU Kuparuk PA (MLNE)
360
55
4.66
MP F -66A
MPU Kuparuk PA (MLNE)
364
57
4.78
MP F-69
MPU Kuparuk PA (MLNE)
161
23
4.36
MP F -76A
MPU Kuparuk PA (MLNE)
355
49
4.21
MP F-79
MPU Kuparuk PA (MLNE)
316
42
4.05
MP F-86
MPU Kuparuk PA (MLNE)
324
34
3.20
MP F -87A
MPU Kuparuk PA (MLNE)
356
51
4.37
MP F-93
MPU Kuparuk PA (MLNE)
356
55
4.71
MP F-94
MPU Kuparuk PA (MLNE)
358
49
4.17
MP F-96
MPU Kuparuk PA (MLNE)
359
48
4.08
MP G-02
MPU Schrader Bluff PA ( SCHR)
319
117
11.19
MP G-08 A
MPU Schrader Bluff PA (SCHR)
220
80
11.09
MPG -14
MPU Schrader Bluff PA ( SCHR)
365
152
12.70
MPG -16
MPU Schrader Bluff PA ( SCHR)
365
137
11.45
MPG -18
MPU Schrader Bluff PA ( SCHR)
365
116
9.69
MP H-05
MPU Kuparuk PA (MLNE)
274
58
6.46
MP H -08B
MPU Schrader Bluff PA ( SCHR)
365
51
4.26
MPH -16
MPU Schrader Bluff PA ( SCHR)
365
56
4.68
MPH -18
MPU Schrader Bluff PA ( SCHR)
308
49
4.85
Exhibit 6-C Well Test Summary Milne Point Unit
MP I-03
MPU Schrader Bluff PA ( SCHR)
365
142
11.87
MP L -04A
MPU Schrader Bluff PA { SCHR)
8D
11
4.19
LIP 1.-11
MPU Schrader Bluff PA (SCHR)
365
123
1 D28
MP 1-12
MPU Schrader Bluff PA ( SCHR)
96
19
6.D4
MP 1-14
MPU Schrader Bluff PA ( SCHR)
357
133
11.36
MP 1-15
MPU Schrader Bluff PA { SCHR)
126
44
1 D.65
MP 1--17
MPU Schrader Bluff PA ( SCHR)
307
10B
10.73
MP k19
MPU Schrader Bluff PA ( SCHR)
131
32
7.45
MPJ -01A
MPU Schrader Bluff PA { SCHR)
345
77
6.81
MP J-03
MPU Schrader Bluff PA { SCHR)
365
78
6.52
IAP J-06
MPU Kuparuk PA (MLNE)
358
71
6.05
MP J -08A
MPU Schrader Bluff PA ( SCHR)
95
17
5.46
MP J -09A
MPU Schrader Bluff PA ( SCHR)
289
55
5.80
MPJ -10
MPU Kuparuk PA (MLNE)
364
67
5.61
MP J-25
IAPU Schrader Bluff PA ( SCHR)
364
69
5.78
MP J-26
MPU Schrader Bluff PA ( SCHR)
362
63
5.31
MP J-27
MPU Schrader Bluff PA ( SCHR)
365
8B
7.35
MP J-28
MPU Schrader Bluff PA ( SCHR)
365
91
7.60
MP K-05
MPU Kuparuk PA (MLNE)
357
104
8.89
MP K-17
MPU Kuparuk PA (MLNE)
365
10D
8.36
PAP K-30
MPU Kuparuk PA (MLNE)
352
1D7
9.27
MP K-33
MPU Kuparuk PA (PALNE)
198
51
7.86
MP K-33
MPU SagMnd ADL 375132 (MP03)
101
27
8.15
MP K-38
MPU Kuparuk PA (MLNE)
28
B
8.71
PAP K-44
MPU Kuparuk PA (MLNE)
365
121
10.11
MP L -02A
MPU Kuparuk PA (MLNE)
365
76
6.35
MP L-03
MPU Kuparuk PA (IALHE)
315
63
6.10
MP L-04
MPU Kuparuk PA (MLNE)
364
73
6.12
MP L-05
PAPU Kuparuk PA (MLNE)
365
74
6.18
MP L-07
MPU Kuparuk PA (MLNE)
359
70
5.95
MP L-11
MPU Kuparuk PA (MLNE)
362
7B
6.57
MP L-12
MPU Kuparuk PA (MLNE)
365
75
6.27
MP L-13
MPU Kuparuk PA (IALNE)
364
66
5.53
MP L-14
MPU Kuparuk PA (MLNE)
327
34
3.17
NIP L-20
MPU Kuparuk PA (MLNE)
365
70
5.85
MP L-25
MPU Kuparuk PA (MLNE)
357
63
5.38
MP L -28A
MPU Kuparuk PA (MLNE)
364
74
620
MP L-29
MPU Kuparuk PA (MLNE)
365
73
6.10
MP L-36
IAPU Kuparuk PA (MLNE)
176
3B
6.59
MP L-39
MPU Kuparuk PA (MLNE)
181
32
5.39
FAP L-40
MPU Kuparuk PA (IALNE)
358
64
5.45
MP L-43
MPU Kuparuk PA (IALNE)
348
63
5.52
Exhibit 6-C
Well Test Summary
Milne Point Unit
Formation Name
1 Total
Tests Avg. Tests
MP L-46
MPU Schrader Bluff PA ( SCHR)
332
69
6.34
MP L-47
MPU Schrader Bluff PA ( SCHR)
365
78
6.52
MP L-53
MPU Schrader Bluff PA ( SCHR)
13
1
2.35
MP S-05
MPU Schrader Bluff PA ( SCHR)
355
93
7.99
MP S-12
MPU Schrader Bluff PA ( SCHR)
361
92
7.77
MP S-17
MPU Schrader Bluff PA ( SCHR)
361
78
6.59
MP S-23
MPU Schrader Bluff PA ( SCHR)
349
80
6.99
MP S-25
MPU Schrader Bluff PA (SCHR)
361
86
7.27
MP S-27
MPU Schrader Bluff PA (SCHR)
358
84
7.16
MP S-28
MPU Schrader Bluff PA ( SCHR)
361
60
5.07
MP S-35
MPU Schrader Bluff PA ( SCHR)
361
59
4.98
MP S-90
MPU Sag ADL 380109 (MP18)
341
50
4.47
Section 7
Annual Review of Plan of Development
List of Exhibits
MPU Annual Plan of Development and Operations 7-A
Exhibit 7-A Review of Annual Plan of Development and Operations Milne Point Unit
I. FIELD OVERVIEW
The MPU consists of the Kuparuk Reservoir in the Kuparuk Participating Area, the Schrader
Bluff Reservoir in the Schrader Bluff Participating Area, the Sag River Reservoir in the Sag
River Participating Area, C-23 Tract Operations, K-33 Tract Operations, and the Ugnu MPS -
37, MPS -39, MPS -41 and MPS -43 Tract Operations.
II. PLAN REVIEW
A. Drilling Program
Hilcorp completed seven drill wells in 2017:
• B-32
— Schrader Nc sand lateral producer
• B-33
— Schrader Nc sand lateral injector
• B-30
— Sag producer
• C-46
— Sag producer
• C-45
— Kuparuk producer
• L-51
— Schrader Nb sand lateral producer
• L-53
— Schrader Nb sand lateral producer
Hilcorp drilled the C-47 Kuparuk well and left suspended with surface casing after losing the
production hole section
B. Workover Program
Hilcorp completed the following well projects:
• Schrader Bluff
o 4 ESP Change -outs — I-15 / I-19 / G-02 / L-46
• Kuparuk
0 6 ESP Change -outs — E -14A / E-04 / E-22 / L-14 / L-36 / F-50
0 1 Conversion from ESP to gas lift — E-11
0 1 Gas lift completion repair — B-10
C. Major Facility Projects
Key activities included:
• Installing pig traps to split J Pad produced water pipeline into two segments to allow for
inline inspection (currently dual diameter).
• HVAC upgrade for G&I
• F -Pad PLC upgrade (to support upcoming drill wells)
Exhibit 7-A Review of Annual Plan of Development and Operations Milne Point Unit
• L -Pad infrastructure upgrades to support drill wells
• Rig Shore power for E -Pad, repairs for F -Pad
• Fire Gas Upgrades — at Mod6l/56/57/69/54/07/08 to address obsolescence and compliance
issues.
• Smart Pig In -line -Inspections (ILI) — were completed for S/CB production pipeline, F&L
production pipeline, CFP to J produced water pipeline.
• Major Overhaul - Swap LM2500 turbine and send out for major Overhaul
• E Pad Expansion — expand the pad to accommodate 5 new wells
• L Pad Expansion — expand the pad to accommodate 8 new wells
• Moose Pad — new road and pad will be installed
III. 2017 PLAN OF DEVELOPMENT AND OPERATIONS
A. Proposed Drilling Program
During the 2018 calendar year, Hilcorp anticipates drilling up to sixteen new wells, including:
• 5 Schrader Oa wells from F Pad — F-106-110 ( 2 prod / 3 inj)
• 4 Schrader Nb wells from L Pad — L-52 /54 / 56/ 58 (1 inj / 3 prod)
• 2 Sag producers from L Pad — L-55 / 58
• 1 Kuparuk well from L Pad — L-41
• 1 Kuparuk well from C Pad — C-47 (surface hole completed in 2017)
• 2 Schrader Oa wells form Moose Pad — M-10/11 (1 prod / 1 inj)
B. Proposed Workover Program
During the 2018 calendar year, Hilcorp anticipates completing up to 24 well workovers with the
ASRI rig and 1 well workover with the Doyon 14.
C. Major Facility Projects
Key facility projects anticipated to be undertaken during 2018 include:
• L Pad power upgrade to supply power to Moose Pad
• E -Pad infrastructure upgrades to support drill wells
• Moose Pad — installation of pipelines and facilities
IV.