Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2019 Swanson TyonekHilcorp Alaska, LLC fTl February 25, 2020 Mrs. Jessie Chmielowski, Commissioner Alaska Oil and Gas Conservation Commission 333 W. 7`' Avenue, Suite 100 Anchorage, AK 99501 Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 100 Anchorage, AK 99503 Phone: 907/777-8322 Fax: 907/777-8310 Re: 2019 Annual Material Balance Calculations of Production and Injection Volumes — Swanson River Gas Storage Facility #3 (Tyonek 77-3 sand) Swanson River Field Dear Commissioner Chmielowski: Attached for your review is the annual material balance calculation of production and injection volumes for the Swanson River Gas Storage Facility #3 (SRGSF 43), as required per AOGCC Storage Injection Order #6 (SIO #6). This material balance report covers the primary production period (Jul. 2004 — Nov. 2005), as well as the gas storage operations that have taken place since Dec. 2005. The 77-3 reservoir in the Swanson River field was in active use for all of 2019 and was an important component of total gas deliverability for the Cook Inlet. There are two active wells that are used for injection and production — SCU 42-05X and SCU 42-05Y. Hilcorp has performed material balance calculations on the 77-3 reservoir to provide assurance of continued reservoir confinement of the gas storage volumes. Supporting data is attached in numerical and graphical form (P/Z plot) for the convenience of the reader. Notice that twelve BHP calculations were made for the 2019 storage cycle between January and December. These data points are plotted with the historical data and they conform to the overall curve, indicating continued confinement of the storage gas. Si 1�nthony McConkey Reservoir Engineer Attachments: 1) Tyonek 77-3 Annual Production/Injection Plot 2) Tyonek 77-3 P/Z Data RECEIVED 3) Tyonek 77-3 P/Z vs Cumulative Production Plot FEB 2 8 2020 O N O N L Ln N N (p;Dsw) uoipaful / uoil3npoad Attachment #t2 77-3 P/Z Data ATTACHMENT #2 -- SRGSF POZ DATA (Tyonelc 77-3 Sand) Parameter Value Units Gas Gravity 0.563 7977 7811 Bench Datum 7811 ft (tvd) Datum Temp. 141 -F Avg Temp. 77 'F 2/25/2020 Wellname OH -- MD OH --TVD Top 7972 7806 midperf 7977 7811 Bottom 7982 7816 2/25/2020 Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth MTP it Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf PIZ, Psia 2004 - 05 Primary Production Date Test Type Duration Test Depth MTD, psia Z Factor Pressure, Cum Gas, bcf 42A-5 06/27/04 Surf PBU 1 0 3994 0.9803 4774 0,0000 4870 42A-5 10/22/04 Surf PBU 1 0 3050 0.9110 3646 0.5354 4002 42A-5 12/21/04 BHP Static 1 7982 3194 0.8933 3194 0.8403 3576 42A-5 2/8/2005 BHP PBU 8 7982 2482(SITP) 0.8859 2926 1.0599 3303 42A-5 06/23/05 BHP PBU 8 7811 1985 0.8835 1985 1.7931 2247 42A-5 07/11/05 JSITP 2 0 11565 0,8859 1871 1.8881 2112 42A-5 08/25/05 SITP 3 0 1385 0.8923 1655 2.1024 1855 42A-5 09/13/05 SITP 3 0 1490 0.8883 1781 2.1051 2005 42A-5 10/25/05 BNP PBU 8 7811 1556 0.8959 1556 2.2666 1737 2006-2007 Production/Injection Cycle Test auge Measured Pressure at um Wellname Date Weliname Date Test Type Duration Test Depth MTD, psia Z Factor Pressure, Cum Gas, bcf PIZ, Psia SITP 48 0 (hrs) 0.8871 1826 2.3406 Psia 42A5 5/21/2006 2006 Injection Cycle 0 0 1700 0.8801 2031 2.2750 2308 42A5 42A&B-5 1/412006 1 BHP Static 42 7811 1857 0.8803 1 2232 1 2.1371 1 2535 2006 Production Cycle 8/3/2006 SITPI BHP PBU 15 0 1875 0.8801 2256 2.1420 42A&B-5 3/10/2006 SITP 4 0 1895 0.8802 2236 2.1166 2540 42A&B-5 3/18/2006 BHP Static 1 7811 2026 0.8827 2026 2.1793 2295 4213-5 4/12/2006 Surf PBU 42b-5, BHP Stalin 42n 120 0 1412 0,8911 1689 2.3533 1895 4213-5 5/4/2006 SITP 96 0 1280 0.8969 1530 2.4245 1706 2006-2007 Production/Injection Cycle Wellname Date Test Type Test Duration (hrs) auge Measured Test Depth Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42A&B-5 5/17/2006 SITP 48 0 11528 0.8871 1826 2.3406 2058 42A5 5/21/2006 Psuedo SITP 0 0 1700 0.8801 2031 2.2750 2308 42A5 6/9/2006 Psuedo SITP 192 0 2010 0.8794 2403 2.1013 2733 42-05X 8/3/2006 SITPI BHP PBU 15 0 1875 0.8801 2256 2.1420 2563 42-05X 8/24/2006 SITP/BHP PFO 12 0 2400 0.8851 2886 1.9311 3261 42-05X 9/7/2006 SITP 24 0 2826 0.9004 3396 1.6956 3772 42-05X 9/26/2006 SITP 24 0 3347 0.9290 4000 1.4109 4306 42-05X 10/312006 SITP 53 0 3312 0.9267 3958 1.3853 4271 42-05X 10/612006 SITP 11 0 3309 0.9265 3955 1.3781 4269 42-05X 10/17/2006 SITP 107.5 0 3245 0.9234 3896 1.3564 4219 42-05X 10/20/2006 BHP PFO 8 7794 3241 0.9216 3862 1.3440 4191 42-05X 11/8/2006 SITP 31.5 0 3445 0.9358 4118 1.2292 4401 42-05X 11/16/2006 SITP 44.5 0 3403 0.9328 4067 1.2017 4360 42-05X 12/312006 SITP 146.3 0 3119 0.9583 3728 1.2614 3890 42-05X 1/7/2007 SITP 89 0 3469 0.9374 4146 1.0622 4423 42-05X 4/20/2007 SITP 20 0 3794 0.9626 4534 0.7819 4710 42-05X 5/22/2007 SITP 8 0 3755 0.9583 4473 0.6981 4668 42-05X 8/28/2007 SITP 112 0 3715 0.9561 4440 0.5362 4644 42-05X 1 11/26/2007 ISITP 1840 10 13815 0.9644 4560 0.4058 4728 Attachment #2 77-3 P/Z Data 2/25/2020 Weilname Date Test Type Test Duration (hrs) I auge Measured Test Depth Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 2008 Production Cycle 42-06X 11/13/2008 SITP 72 0 3214 0.9182 3796 42-05X 12/14/2007 SITP 89.5 0 3647 0.9507 4359 0.4640 4585 42-05X 1/4/2008 SITP 31 0 3258 0.9231 3890 0.6221 4214 42-05X 1/2312008 SITP 7 0 2676 0.8934 3199 0.9051 3581 42-05X 2/8/2008 SITP 10 0 1990 0.8797 2379 1.2354 2704 42-05Y 1 2/13/2008 SITP 27.3 0 1909 1 0.8800 2282 1,3153 2593 2008 Injection Cycle 2009/2010 Production Cycle 42-05X 12/7/2009 1 SITP 30 0 3834 0.9808 4808 0.1798 4902 42-05X 1/10/2010 SITP 48 0 3750 0.9604 4512 0.2776 4698 42-05X 1/19/2010 SITP 48 0 3275 0.9543 4419 0.3122 4631 42-05X 4/10/2010 SITP 288 0 3544 0.9183 3881 0.5812 4226 2010 Injection Cycle Weliname 42-05X 5/16/2008 SITP 24 0 3668 0.9476 4311 0.7183 4549 42-05X 6/6/2008 SITP 216 0 3771 0.9552 4427 0.6227 4635 42-05X 7/6/2008 SITP 96 0 3915 0.9663 4587 0.5028 4747 42-05X 9/22/2008 SITP 96 0 3796 0.9571 4455 0.3698 4655 42-05Y 10/7/2008 SITP 96 10 3857 1 0.9618 14523 1 0.3667 1 4703 2008/2009 Production Cycle Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth (MTD). ft Pressure at MTD, psia Z Factor Datum Pes ure, Psia Cum Gas, bcf P/Z, Psia 42-06X 11/13/2008 SITP 72 0 3214 0.9182 3796 0.5991 4134 42-05X 11/30/2008 SITP 24 0 2847 0.8995 3372 0.7908 3749 42-05X 12/8/2008 SITP 96 0 2719 0,8942 3222 0.8756 3603 42-05X1/14/2009 SITP 24 0 1518 0.8880 1792 1.5812 2018 42-05Y 1 4/21/2009 SITP 336 0 1799 0.8740 2148 1.8027 2458 2009 Injection Cycle 42-05X 1 11/11/2009 JSITP 1192 lo 14256 1 0.9922 1 4967 1 0.1367 5006 2009/2010 Production Cycle 42-05X 12/7/2009 1 SITP 30 0 3834 0.9808 4808 0.1798 4902 42-05X 1/10/2010 SITP 48 0 3750 0.9604 4512 0.2776 4698 42-05X 1/19/2010 SITP 48 0 3275 0.9543 4419 0.3122 4631 42-05X 4/10/2010 SITP 288 0 3544 0.9183 3881 0.5812 4226 2010 Injection Cycle Weliname Date Test Type Test Duration (hrs) Gauge Measured Test Depth (MTD), ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 5/22/2010 SITP 24 0 3544 0.9361 4185 0.5215 4471 42-05X 9/1/2010 SITP 24 0 4253 0.9901 4971 0.1269 5021 42-05X 9/19/2010 SITP 172 Io T 0.9745 4765 1 0.1227 4890 42-05X 10!21/2010 SITP 1552 10 14101 0.9779 4804 0.1203 4913 42-05Y 11/9/2010 SITP 168 10 14025 0.9719 1 4720 0.1181 4856 2010/2011 Production Cycle 42-05X 1 1/4/2011 JSITP 124 10 13546 0.9363 1 4187 1 0.3263 4472 42-05XY 1 3/1/2011 ISITP 0.8670 1578 1.3387 1820 2011 Injection Cycle 42-05XY 1 10/30/2011 ISITP 0.9945 5057 0.1331 5085 2012 Production/Injection Cycle Attachment #2 77-3 P/Z Data 2/25/2020 Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth (MTD), ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 5/31/2012 SITP/ BHP PBU 192 7811 2448 0.8219 2448 1.4721 2978 42-05X 8/7/2012 SITP 3939.7 0 2195 0.8923 2604 1.5031 2918 42-05Y 8/7/2012 SITP 3577.7 0 2185 0.8922 2592 1.5031 2905 42-05X 9/22/2012 SITP 3445.7 0 2541 0.9014 3013 1.3469 3343 42-05Y 9/22/2012 SITP 3363.7 0 2553 0.9018 3027 1.3469 3357 42-05X 10/21/2012 SITP 3327.7 0 3165 0.9304 3737 1.0322 4017 42-05Y 10/21/2012 SITP 3357.7 0 3155 0.9298 3726 1.0322 4007 SITP 0 2955.7 0.9037063 3,501 0.3952 3874 42-05Y 9/28/2014 2013 Production/Injection Cycle 0 3119.7 0.9135099 3,688 0.3912 4038 Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth (MTD), ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 4/12/2013 SITP 0 3661 0.96047 4303 0.9806 4480 42-05X 5/18/2013 SITP 0 3425 0.94511 4037 0.7394 4271 42-05Y 5/18/2013 SITP 0 13427 0.94522 4039 0.7394 4273 42-05X 8/1712013 SITP 0 3801 0.97011 4461 0.3172 4598 42-05Y 8/17/2013 SITP 0 3806 0.97048 4467 0.3172 4603 42-05X 9/7/2013 SITP 0 3748 0.9664 4401 0.3005 4554 42-05Y 10/27/2013 SITP Pressure at MTD, psia 0 3929 0.97912 4604 0.1788 4702 2014 Production/Injection Cycle Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth MTD ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 10/30/2013 SITP 0 3939.7 0.9844495 4,615 0.1751 4687 42-05X 4/14/2014 SITP 0 3577.7 0.9486947 4,208 0.2911 4435 42-05Y 5/1412014 SITP 0 3445.7 0.9373886 4,059 0.2914 4330 42-05X 6/10/2014 SITP 0 3363.7 0.9308376 3,966 0.3226 4261 42-05Y 7/31/2014 SITP 0 3327.7 0.9280766 3,925 0.2979 4229 42-05Y 8/5/2014 SITP 0 3357.7 0.9303726 3,959 0.2902 4255 42-05Y 9/6/2014 SITP 0 2955.7 0.9037063 3,501 0.3952 3874 42-05Y 9/28/2014 SITP 0 3119.7 0.9135099 3,688 0.3912 4038 42-05Y 1011/2014 ISITP 0 3014.7 0.9070611 3,569 0.3997 3934 42-05Y 1 10/5/2014 ISITP 0 2873.7 0.8993665 3,407 0.4413 3788 42-05X 11/2/2014 SITP 0 2723.7 0.8924065 3,235 0.5348 3625 42-05X 12/2/2014 SITP 0 2656.7 0.8897095 3,158 0.5941 3549 42-05X 12/31/2014 SITP 0 2633.7 0.8888426 3,131 0.6378 3523 2015 Production/Injection Cycle Wellname Date Test Type Test Duration (hrs) Gauge Measured Test Depth MTD ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 1/9/2015 BHP 7896 3206 0.8913932 3,207 0.6441 3598 42-05X 1/21/2015 SITP 0 2694.7 0.8912078 3,202 0.6111 3592 42-05X 2/23/2015 SITP 0 2688.7 0.8909658 3,195 0.6607 3586 42-05X 5/1/2015 SITP 0 2449.7 0.8829988 2,919 0.8274 3305 42-05X 5/13/2015 SITP 0 2422,7 0.8823055 2,887 0.8415 3273 42-05X 6/1/2015 SITP 0 2583.7 0.8870623 3,074 0.8094 3465 42-05X 6/14/2015 SITP 0 2594.7 0.8874417 3,086 0.8174 3478 42-05X 6/28/2015 SITP 0 2594.7 0.8874417 3,086 0.8181 3478 42-05X 7/12/2015 SITP 0 2530.7 0.8853316 3,012 0.8468 3403 42-05X 7/20/2015 SITP 0 2513.7 0.8848106 2,993 0.8602 3382 42-05X 8/5/2015 ISITP 10 12448.7 1 0.8829724 2,918 0.8928 3304 Attachment #2 77-3 P/Z Data 12016 Productio 2017 Productio Wellname 142-05X 12018 Productio 42-05Y 42-05X 42-05Y 42-05Y 42-05Y 42-05Y 42-05X 42-05Y 8/14/2015 SITP 8/22/2015 BHP 9/3/2015 SITP 9/28/2015 SITP 10/4/2015 SITP 11/13/2015 SITP 11/18/2015 ISITP 12/14/2015 ISITP /Injection Cycle Date Test Type 2/19/2016 SITP 3/5/2016 BHP 5/17/2016 SITP 5/30/2016 SITP 6/19/2016 SITP 7/14/2016 SITP 7/15/2016 SITP 8/2/2016 SITP 8/30/2016 SITP 10/11/2016 BHP 11/16/2016 SITP /Injection Cycle Date Test Type 6/5/2017 SITP 6/24/2017 SITP 7/23/2017 SITP 9/12/2017 SITP 10/14/2017 SITP 11/20/2017 SITP /Injection Cycle Date Test Type 2/11/2018 SITP 4/13/2018 SITP 5/1/2018 SITP 5/16/2018 SITP 6/2/2018 SITP 6/16/2018 SITP 6/26/2018 SITP 7/18/2018 SITP 9/14/2018 SITP 10/4/2018 SITP 10/19/2019 SITP 11/19/2018 SITP 12/912018 SITP 12/30/2018 SITP 2/25/2020 0 2514.7 0.8848408 2,994 0.8811 3384 7910 2942 0.8835421 2942 0.9147 3330 0 2394.7 0.8816311 2,855 0.9322 3238 0 2380.7 0.8813109 2,839 0.9541 3221 0 2368.7 0.8810455 2,825 0.9636 3206 0 2048.7 0.8770805 2,452 1.1546 2796 0 12095.7 0.8772847 1 2,507 1 1.1886 1 2858 0 12254.7 1 0.8789433 1 2.693 1 1.0992 1 3063 ""a` Measured Test Depth MTD ft Pressure at MTD, psia Z Factor Datum Pressure, Psia Cum Gas, bcf P/Z, Psia 0 1931 0.877146 2,315 1.0533 2639 7896 2870 0.8819539 2.871 1.0532 3255 0 2334 0.8803254 2,785 1.0961 3163 0 2634 0.8888537 3,132 0.9800 3523 0 2958 0.9038334 3,504 0.8262 3877 0 3530 0.9445013 4,154 0.5438 4398 0 3520 0.9436376 4,143 0.5328 4390 0 4090 1.0013074 41782 0.2904 4776 0 14230 1 1.0180554 4938.1332 0.0964 4851 7968 14960 1 1.1213093 5742 -0.0141 5121 0 13500 1 0.9419263 4,120 0.1454 4374 Test Gauge Pressure at MTD, psia Z Factor Datum Cum Gas, bcf P/Z, Psia Duration Measured Pressure at Z Factor Pressure Cum Gas, bcf P/Z, Psia (hrs) Test Depth MTD, psia 0.8612 Psia 1.0833 2979 MTD ft 2135 0.8628 2,610.69 1.0537 3026 0 2280 0.8823726 2,777 0.7798 3147 0 2373 0.8849871 2,889 0.7812 3264 0 12425 1 0.8866438 1 2,951 0.7930 3328 0 2690 0.8971043 3,264 0.7033 3638 0 2703 0.8976875 3,279 0.6896 3653 0 2684 0.8968347 3,257 0.6823 3632 Test Gauge Duration Measured (hrs) Test Depth MTD ft Pressure at MTD, psia Z Factor tum Pressure, Psia Cum Gas, bcf P/Z, Psia 0 2215 0.8592 2,707.50 0.8838 3151 0 2098 0.8612 2,565.77 1.0833 2979 0 2135 0.8628 2,610.69 1.0537 3026 0 2266 0.8640 2,768.98 1.0048 3205 0 2333 0.8659 2,849.47 0.9630 3291 0 2420 0.8687 2,953.50 0.9319 3400 0 12544 0.8735 3,100.81 0.8845 3550 0 2780 0.8881 3,452.67 0.7828 3888 0 3200 0.8917 3,885.26 0.5108 4357 0 3251 0.8967 3,920.55 0.4844 4372 0 3262 0.8984 3,933.06 0.4595 4378 0 3021 0.9111 3,657.40 0.5091 4014 0 2960 0.9132 3,626.30 0.5447 3971 0 2876 0.9139 3,527.83 0.5630 3860 Attachment #277-3 P/Z Data 2/25/2020 2019 Production/Injection Cycle Weliname Date Test Type Gauge Dusration Measured (hrs) Test Depth (MTD), ft Pressure at MTD, psia Z Factor um Pressure, Psia Cum Gas, bcf P/Z, Psia 42-05X 1/4/2019 SITP 0 2830 0.8928 3,377.6 0.5775 3783 42-05X 1/27/2019 SITP 0 2851 0.8940 3,402.7 0.5918 3806 42-05X 2/24/2019 SITP 0 2803 0.8914 3,345.4 0.6068 3753 42-05X 3/16/2019 SITP 0 2844 0.8936 3,394.4 0.6071 3799 42-05Y 4/30/2019 SITP 0 2558 0.8799 3,052.4 0.7358 3469 42-05Y 5/15/2019 SITP 0 2465 0.8765 2,941.2 0.7992 3356 42-05Y 6/2/2019 SITP 0 2465 0.8765 2,941.2 0.8242 3356 42-05X 7/31/2019 SITP 0 12291 0.8715 2,733.2 0.9434 3136 42-05X 8/31/2019 SITP 0 2325 0.8723 2,773.9 0.9515 3180 42-05X 9/30/2019 SITP 0 2370 0.8735 2,827.7 0.9501 3237 42-05X 10/12/2019 SITP 0 2526 0.8787 3,014.2 0.9102 3430 42-05X 12/9/2019 SITP 0 3211 0.9165 3,833.2 0.5915 4182 O N O N r-4 N N