Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout173-038PLUGGING & LOCATION CLEARANCE REPORT State of Alaska .m~s~ 0IL & GAS CONSERVATION COMMISSION PTD NO. ~-(g~8 Lease.~A ' L ~ ~ Memorandum To File: API No. Well Name Operator Location ,~3Z - 2~ Z ~-8 -oo Spud TD: ld)!?(~(~ , Completed Note casing size, wt, depth, cmt vol, & procedure. Long Csg: Liner: Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. / Well head cut off: Marker post or plate: Location Clearance: Conclusions: Code ~ STATE OF ALASKA ~ ~LASKA OIL AND GAS CONSERVATION COMMISSION wELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Servic~ Well 2. Name of Operator '1~-- -,---  7, Permit Number Shell Western E&P Inc. 73-38 3. A~ress (WCK 5231 s. AP~Number P.O. BOx 576, Houston, TX 77001-0576 ~o- 733-20258 4. Location of well at surface '9. Unit or Lease Name PLATF A, LEG 4, COND 28, 1564' FSL & 378' FEL Sll, TSN, R13W, S.H. HIDDLE GROUND SHOAL At Top Producing Interval 10. Well Number NA A24-01 At Total depth 11. Field and Pool 10,900' ND, 5743'N & 1910'E OF SE CORNER SEC. 11, T8N, R13N, SN 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. NIDDLE GROUND SHOAL 116' KBI ADL 18754 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or At)and 115. Water Depth, if offshoreI 16. No. of Completions 2-15-74 4-12-74 3-26-95I 80 feetaSLI' S]:NGLE 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVDl 19. DirectionalSurvey 120. Depth where SSSV set I 21. Thickness of Permafrost 10,900' ND; 9486'w~ 10,011' HD;$l'00'rv=' YES [] NOI~ I TRSCSSV (a 304' feetaolN/A 22. Type Eiectrlo or Other Logs Run 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED c0,o. 0 ... 7"29~ N-80 0 10,888' 9-7/8" 2100 SX - - - 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD Interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SiZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-MCF WATER-BBL OIL GRAVITy-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. R E E;VED SEP 2 5 1995 ^mska {JAI & (]as Cons. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ONREVERSE SIDE - 49 - - F~nMATION TESTS ' '~~ Include interval tested, pressure data, all fluids recovered and gravity, GOR, NAME MEAS, DEPTH TRUE VERT, DEPTH and time of each phase, GH 9270' 8117' , , GN 9283' ' 8128' : GO 9314' 8153' GR 9663' 8438' GS 9726' 8490' HC 9965' 8691' HD 10,098' 8801' HE 10,109' 8812' HF 10,134' 8833' HI 10,186' 8877' IlK 10,234' 8918' HN 10,386' 9047' 31. LIST OF ATTACHMENTS HORN[NG REPORTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge s. / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on -all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. . Item 27: Method of Operation: Flowing. Gas Lift. Rod Pump. Hydraulic Pump.. Submersible. Water Injection. Gas Injection. Shut-in. Other-explain. ,. Form 10-407' SwEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 11943 ,D MIDDLE GROUND SHOAL PRESENT DEPTH b~SE PLATFORM "A" FOOTAGE DRILLED WELL A24-01LE SIZE OF LAST CSG 7.000 WORK ORDER 723530 DEP. OF LAST CSG 10888 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF DAY NLTA LTH/YTD / EST. DAY LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 224 LAST BOP TEST 03/23/95 LAST CSG TEST 03/26/95 22 DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: TIH WITH RTTS /FREDERICK DA SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.50 CHANGE PIPE RAMS - STRAP AND CkLIPER MILL BHA ASSY 3.50 TEST BLIND RAMS AND PIPE RAMS - PERFORM ACCUMULATOR TIME TEST - INSTALL WEAR RING AND LOCK DOWN BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 @ KILL SPEED 1.50 MAKE UP BHA - WINDOW MILL, CASING SCRAPER, WATERMELON MILL, BS WITH FLOAT, 6 DC'S, UP JARS, DOWN JARS 7.50 RIH TO 10040' - FILL PIPE · 5500' - POOH 17 STANDS - PICK 51 JTS 3-1/2 DP 1.50 CIRCULATE WITH FIW - RETURNS TO INJECTION WELL VIA GAS BUSTER 1.50 CHECK FLOW - PUMP PILL 4.00 POOH WITH MILL 'AND SCRAPER ASSY - SLM 1.00 MAKE UP CIRCULATING VALVE AND RTTS 1.00 RIH WITH RTTS NOTE: FIRE AJ~ARM @ 8:30 PM - FALSE ALARM - SMOKE DETECTOR ON 1ST FLOOR ZONE 2 - WELL WAS SECURED IN ONE MINUTE - PERSONNEL REPORTED TO REC. ROOM WITH AIR PACKS AND FLOAT SUITS - GOOD RESPONSE TIME. TIME (HRS) CUM. ROT. HRS ROT AT I NG MUD MOTOR TRIPPING 12 . 50 C & C 3.00 REAM I NG SURVEYS JET RE PAI RS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH 3.50 RUNNING, CASING CEMENTING PICkUP/LAY DOWN DS 2.50 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUAT I ON CORING OTHERS 2.50 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 11943 ) MIDDLE GROUND SHOAL pRESENT DEPTH L=_~E PLATFORM "A" FOOTAGE DRILLED WELL A24-01LE SIZE OF LAST CSG 7.000 WORK ORDER 723530 DEP. OF LAST CSG 10888 SIDE TRACK WATER DEPTH 80 ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF DAY NLTA LTH/YTD / EST. DAY LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 225 LAST BOP TEST 03/23/95 LAST CSG TEST 03/27/95 5 22 DRILLING FOREMAN: WELLS R V . PRESENT ACTIVITY: SET WHIPSTOCK /FREDERICK DA SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.50 FINISH TIH WITH RTTS ASSY 1.00 SET PACKER ~ TEST CASING TO 2000# FOR 30 MIN. - HELD OK .50 CHECK FOR FLOW - PUMP DRY JOB 4.00 POOH WITH RTTS ASSY 4.50 1.00 BHA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED RIG UP SWS - HOLD SAFETY AND PROCEDURE MEETING - RIH WITH BAKER CIBP - SET PLUG TOP ~ 10011' - POOH - RIG DOWN SWS '/' MAKE UP WHIPSTOCK AND ORIENTING SUB 8.00 RIH WITH WHIPSTOCK ASSY TO 9878' 1.50 MAKE UP TOP DRIVE - BREAK CIRCULATION AND ORIENT WHIPSTOCK - SET WHIPSTOCK - HANGER BOLT SHEARED ~ 8K TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING 15.50 C & C 1.00 REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS' 1.00 INSPECT'BHA ' RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORTNG RIG NAME PLATFORM "A"__ PROG. DEPTH F)~'~ MIDDLE GROUND SHOAL PRESENT DEPTH L PLATFORM "A# FOOTAGE DRILLED UELL A24-O1LE SIZE OF LAST CSG SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 11943 ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF DAY 2 NLTA LTH/YTD / EST. DAY __~2~ 7.000 LTA LTH/YTD ___/___ DAYS +/- DAYS SINCE LAST LTA ~2_~2 LAST BOP TEST ~3/~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT MRS) PP1 @ KILL SPEED PP2 @ KILL SPEED @ UORK ORDER 723530 DEP. OF LAST CSG- 10888 SIDE TRACK gATER DEPTH 80 DRILLING FOREMAN: gELLS R V__ /FREDERICK ~A PRESENT ACTIVITY: JAR ON TUBING HANGER SUMMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) : 4.00 TEST BOP'S 6.50 INSTALL DRIP PAN AROUND BELL NIPPLE - FINISH CLEANING UP IN SUB AROUND HATCH COVERS AND DECK - BOLT DOgN AND SILICONE gEAR PLATE FOR 6" AUGER AND INSTALL GUARDS - CUT HOLE IN HATCH COVER FOR MOUSE HOLE AND PATCH HOLE FROM LAST gELL - MIX 90 BBLS 9.2 PPG FLUID AND FILL TRIP TANK 2.50 BACK OUT TUBING HANGER SET SCREgS - ATTEMPT TO UNSEAT HANGER - HANGER gill NOT COME. LOOSE 2.00 PICK UP (3) 4-__3/_~# DC'S~_4._:.-~Z~" UP ~RS, 1 JT 3-~2" DP AND XO - MAKE UP TO TUBING HANGER 9.00 JAR ON TUBING HANGER - PULL 175K TO 180K BEFORE JARS GO OFF - JAR 10 TIMES AND COOL OFF JARS gITH gATER - CONTINUE JARRING - BLEED OFF__ ANNULUS GAS AND MONITOR - CONTINUE JARRING THANKS TO JOE ROSUELL AT HALLIBURTON - JOE IS GOING TO SAVE THE 300 BBL DIESEL TANK gE HAD OUT HERE FOR THE LAST gELL FOR US TO USE ON , THIS gELL. THIS gill SAVE AFL $$ THE COST OF A TANK CLEANING. EVERY LITTLE BIT HELPSlll THANKS JOElll SWEPI ALASKA DAILY DRILLING REPORT CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY OOUN DS INSPECT BHA RIG UP/TEAR DOUN gAIT ON UEATHER/MAT EVALUATION CORING OTHERS PAGE 1 OF 1 4.00 20.00 RT~ NAME PLATFORM "A" PROG. DEPTH 11943 D MIDDLE GROUND SHOAL PRESENT DEPTH L~SE PLATFORM "A" FOOTAGE DRILLED WELL A24-01LE SIZE OF LAST CSG 7.000 WORK ORDER 723530 DEP. OF LAST CSG 10888 SIDE TRACK WATER DEPTH 80 DRILLING FOREMAN: WELLS R V /FREDERICK DA PRESENT ACTIVITY: CHANGE PIPE RAMS SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.00 CONTINUE JARRING ON TUBING I-rANGER .50 LAYDOWN HWDP AND JARS - MAKE UP HWDP AND BUMPER SUB 1.50 JAR UP ON TUBING HANGER WITH MECHANICAL BUMPER SUB ASSY ELEVAT. KB TO MSL 116.0 DATE 03/25/95 DIST. KB TO BHF DAY 3 NLTA LTH/YTD / EST. DAY 22 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 223 LAST BOP TEST 03/23/95 LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PPi ~ KILL SPEED ~ PP2 ~ KILL SPEED ~ 1.00 LAY DOWN BUMPER SUB - MAKE UP X-O, 1JT HWDP, FISHING JARS, 1 4-3/4 DC, ACCELERATOR, 1JT HWDP .50 JAR ON HANGER - HANGER CAME LOOSE ON SECOND HIT 1.00 LAY DOWN ASSY - FILL ANNULUS .50 PULL ON 2-7/8 TUBING AND RELEASE PRODUCTION PACKER 3.00 CLOSE PIPE RAMS - CIRCULATE FIW ~ 1-2 BPM - RETURNS TO PRODUCTION HEADER 4.00 OPEN WELL UP - STILL OIL AND GAS RETURNS - CIRCULATE FIW WITH RETURNS TO INJECTION WELL VIA GAS BUSTER - CHECK FLOW - PUMP 9.0 PPG PILL 10.50 POOH - LAY DOWN PRODUCTION STRING .50 CLEAN RIG FLOOR - CHANGE PIPE RAMS TO 3-1/2 TIME (HRS) CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING 10.50 C & C 7.00 REAM I NG SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENT I NG PICKUP/LAY DOWN DS 2 . 50 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUAT I ON CORING - OTHERS 4.00 SWEPI ALASKA DAILY DRILLING REPORT RT~ NAME PLATFORM "A" PROG. DEPTH 11943 ? MIDDLE GROU1N-D SHOAL PRESENT DEPTH LEASE PLATFORM "A" FOOTAGE DRILLED WELL A24-01LE SIZE OF LAST CSG 7.000 WORK ORDER 723530 DEP. OF LAST CSG 10888 SIDE TRACK WATER DEPTH 80 PAGE 1 OF 1 DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: RIGGING UP /FREDERICK DA ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF DAY NLTA LTH/YTD / EST. DAY LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 220 LAST BOP TEST 03/22/95 LAST CSG TEST SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 RIG SECLIRED FOR AIT BBQ 18.00 _ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED ® PP2 ® KILL SPEED BLEED DOWN GAS FROM INJECTION LINE AND REMOVE FROM ANNULUS VALVE - MAKE UP CIRC. LINES AND PUMP FIW DOWN ANNULUS - LET TBG FLOW TO PROD. HEADER AND MONITOR WHILE RIGGING UP - PREPARE RIG TO SKID EAST - CHANGE HATCH COVERS ON SUB DECK - CENTER RIG OVER A24-01LE - SET STAIRS AND H]kND RAILS - CLEkN PITS - REPAIR VALVES ON SUCTION LINE - SET PIPE RACK AND CAT WALKS IN PLACE - INSTALL SHOCK HOSE NOTE:. THANKS TO ALL AIT Fu~NAGEMENT FOR APPROVING THE BBQ - EVERYONE HAD AN GREAT TIME. SPECIAL THANKS TO RICK CASHION ~ HIS WEATHERFORD FOLKS FOR ~LL THE LONG HOURS AND HARD WORK THEY PUT INTO "MAKING IT HAPPEN". EVERYONE THAT WAS THERE IS MOST APPRECIATIVE!!!! SWEPI ALASKA DAILY DRILLING REPORT 03/22/95 22 TIME (HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH __ TESTING BOP /WH RUNNIN~ CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN 18.00 WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 6.00 PAGE 1 OF 1 Rig NAME PLATFORM "A' PROG. DEPTH 11943 ELEVAT. KB TO MSL ) MIDDLE GROUND SHOAL PRESENT DEPTH DIST. KB TO BHF L~nSE PLATFORM "A' FOOTAGE DRILLED NLTA LTH/YTD WELL A24-01LE SIZE OF LAST CSG 7.000 LTA LTH/YTD WORK ORDER 723530 DEP. OF LAST CSG 10888 DAYS SINCE LAST LTA SIDE TRACK WATER DEPTH 80 LAST BOP TEST 116.0 DATE DAY / EST. DAY / DAYS +/- 221 LAST CSG TEST o~/23/9s 22 DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: PREPARE TO TEST BOP'S /FREDERICK DA BMA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 ~ KILL SPEED S~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 CLOSE SSSV AATD INSTALL BPV - HOLD SAFETY/PROCEDURE MEETING FOR NIPPLE DOWN/UP - BLEED OFF i~NNULUS GAS TO PRODUCTION HEADER UNTIL LESS THAN 60 PSI THEN BLEED OFF TO ON-DECK TANK - REMOVE TREE ASSY - INSTALL RISER - NIPPLE UP BOP'S - REFAB 4" AND 6" CHOKE LINES - C}{ANGE OUT SUCTION VALVE IN MUD PIT - MAKE UP 4" DRAIN HOSE AND ROUTE TO SLOP TANK IN WELL~F_2%D ROOM - FILL PITS WITH FIW - CHANGE SHA_KER SCREENS - MODIFY BELL NIPPLE - PREPARE TO TEST BOP'S NOTE: SPECIAL THANKS GOES OUT TO SCHLUMBERGER FOR ALLOWING EPOCH MUD LOGGERS TO SET UP IN THEIR DOG HOUSE. THIS IS GOING TO SAVE A LOT OF TIME, EFFORT AND $$$9- THANKS FOR BEING A PROACTIVE AIT MEMBER!!! TIME (HRS) CUM. ROT. HRS ROTATING MIlD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNrNING CA~ING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING 24.00 August 22, 1995 Mr. Jeff Wahleither Shell Western E&P Inc P O Box 576 Houston, Tx. 77001-0576 RE: 73-0038 Middle Ground Shoal A24-01 Noncompliance P&A Report Dear Mr. Wahleither: A review conducted on our well files after May reported oil production indicated the referenced well MGS A24-01 well Completion Report (10- 407), has not been forwarded to the Commission. I spoke with A1 Foglesong on June 21 and he would contact Houston office to forward this report as required under 20 AAC 25.070(2). Our regulations require the operator provide this report within thirty (30) days after the well is P&A. The Commission request action on this matter and correct this situation quickly to update our files. Sincerely, Steve McMains Statistical Technician · - : - .. · . · ... . .. :' ':. · . : . ' : · ~1-i t '5 IJ'~TI ii '-:-i.¥].'- I;:~= ~g -=[i~-L~C:~~~~~~~:~:~d'~=-~. ',~ ~.-.=-~-:~='~ --- .... ' ~- - -:'- . .-I- . . . . i .... -I-.... ': -I- Il -t- 1-t -I- ~ -I- ~ V ~:. ................. ' ................ I .... -I'. ....... 'J-. . . [: ~ll ffl :ll di 'Ii :Ii :Ii ~ll ~i 'il ~li ~1: 'Ii ~1~ ~1:1: ~li ~li Tli ~1i :Il di¢: ~ll ~ll ~lJ ~lj Tll ~li Tll di ~li Tli ~ll Iii Tll $ ~I~ ~1~ Tll ill Tll ~ll ~ll di Tll ~li $ ~li ~li Tli Tli Tll ~li TIi Tli Tll ~li :Jl :ii TJi $ TJi Tti Tti ~Ji Tt: iii ~li Ttl ~ll T!i T{i ~ll ~li I F'FI:;I-I I T I !.-'I F,I LIIE D / / -- -- - JI I Il j--Il ' I ' III F'[II.'II.. I C[II)E I I-'::EN!U I I-",:[:':I'II~;I:IT B I Al=. i I ~i~1"1 I I"IIJD I BUR I L:JTH II'-.ILII'IFJI=I'~ _ ~_ _1 _ , · L, · BURl--ACE I_[ICAT.1.[II',I '1 BO'1'T[II'I I-I~IL_E FEET I !) I I":EF'T I D I [-JE I Tt'JF:' I I. I I. .I _ _ I ELEVAT I OI,IB ' BI.lTlLgl.') I FEET I L]D WEI_I_ IqtJI'IF.~ER :: l::t,lBI I'1 I FEE'F I D I FEET I l) I I_-3E I 'T'I..IF' LEASE · DE.i::"I'I'IS FEET I'IUMBER I-ID I TVI) I_OI',.I(.] l TUDE DEB i I'11',11 · I I . I I YRI i ,',1 I I t.ll.I ['I'1 l:-'ll_::O I I:il.ll:ll':'l:' I []I::II'.II:D I.IO IAI'::,-'] I~'' -' :. .:~1 .l[ll~:t-'_ I C,I II)E I LAT I TI.II)E I.)E II I1,11 !-]EL] -! t I I - FC.IL] rAGE F:'EIF]' I 'YI'R I Df:( I. I_LED I'-' EE'I' Y I",: , AI:}'F I.~RF' .~!.:. ' F: Et~_'1' I (:] L) I ~ MAR-l?-1995 06:48 SWEPI KENAI AK Shell Western E&P Inc. 130 Trading Bay, Suite 310 Kenai, Alaska 99611 (90?) 283-30~ P. Ma~h 16, 1995 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: SUBMISSION OF FORM 10-403 APPLICATION FOR. SUNDRY APPROVAL TO ABANDON MrnDLE GROUND SHOAL WELL NO. A24-01. Enclosed in triplicate is thc Application for Su_.ndry Approval, Form 10-403, to abandon the "F" & "O" pools in MOS A24-01. This application supercedes the previously approved Form 10-403 - Approval No. 95-018. Operations arc expected to begin March 20, 1995. fNot¢ that the "F" and "G" pools will be abandoned in A24-01 when the 5" liner is cemented in A24-.01LE.) If you. have any questions, please don't hesitate to call me at (907) 283-2509. Thank you! Sincerely, Alan Fo~le~ons Senior Production Engineer Enclosures Alaska Oil & Gas Cons. MAR-l?-l~95 06: 48 SWEP I KENA I AK ' I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS P. 03 ~h~11 W~~n F&P Thc_ , ....... ~~t~ ~K~ -- E~a~ __ 130 Tradtng Bay, Ste 310 Kenat ~ 99611 ~__ Htdd~e 6round Shoal 4. LoMtt~ ~ ~i ~ ~Uda~ Leg4 Cond28 I564'N&378'W of SE cnr. $ec.11, TSN, R13H, SH 9663'RD:SI22'N&ZIZg'E of SE cnr. Sec.ll, T8N, RI3M, S~ IO,800'MD:5699'N&1935'E of SE cnr. Sec.ll, TSN, R13W, SH IO,900'RD:$743'N&1910'E of SE cnr. Sec. 11, TSN, R13~, SR & WM number AU-O1 9. Pei~nit l~amb~ 73-38. lO, AF~ nLmmr K- 733-tOtSS--O0 ~1, ~t~ HGS 'F' & 'B' Pool 0,800 fo..t 9396 ,..t ~k(.-~,.,,,,~) 10,559' Underreame~ Ftsh Length Size Cement~ 370' 24" 2010' 13-3/8" 1300sx 10,888' 7", 29/ 2100sx 9663' - 10,534' (10 I~ERVALS) 370' 2010' 10.888' Tubinl;I (M?.e, ~l'a4e, ~ i~t,I~1 (mpth) 2-7/8", 6.M, ~80 ~E 8~ e 9193' ;~ ~ ~v (~ ~ ~~ ~) B~ "HB" PACKER e 9152', B~ER FV-6 TRSCSSV e 304' II True 370' 1832' 9472' RECEIVED Alaska Oil & ~as Cons. PI~ i¢l~l'lty ~ Tea~ ~ L~,tI~I1 C~l'~llOe ........ ~ Ifltl~dty Trot __ ~U~t tOrl~ required 1 O- ..._~.,..C~ ~ ORIGINAL SIGNED BY RUSSELL A. DOUGLASS Approved Copy Returned le ' This supercedes previously approved Form 10-403 -Approval No. 95-018. MAR-l?-1995 06:49 SWEPI KENAI AK x~ ,~..~ MIDDLE GROUND SHOAL No. A24-01 ABANDONMENT OF EXISTING HEMLQ.CK PERFORATIONS Abandon the "F" and "O" Pool in A24-01 by setting and c~menting the 5" liner in Plan A24-01LE to 9200'. ProCedure 1. Move to A24-01 (leg 4, conductor 28) and rig up. 2. Kill well. 3. Nipple up 5000 psi BOP stack and t~st. 4. Pull tubing and packer completion ~luipment. 5. GIH with bit and scraI~r and clean out to approximately 10,000'. 6. U~ witeliae and GR to set a flow-through whipstock at 9966' MD-KB and sidetrack. 7. Direciiorml drill to 11,943' MD-~ using a 6" hole. Final hole angle will be 70 d~gr~.~ in a S70E dir~tion, 8. Log, 9. Run a 5" production liner to TD and hang off at 9200' MD.KB. Ccmcnt liner. c :\ms0ffiCC\wiawotd~aogccLa2401pa. 403 mm-- SbJEPI KENAI AK ., MAR-l?-1995 . · , 06:50 P. 06 'ii G t'o,J TOTAL P.06 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Typeof Requ~t: Abandon 'X"&"p~:~.Suspend Operation shutdown Re-enter susp~ded well After casing Change approved program 2. Name of Operator Shell Westet-n F~,P ];nc. 3. Address . P.O. Box 576, Houston, TX Repair well Plugging Pull tubing Time extension Variance 77001-0576 Perforate 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surfa<3e PLATF A, LEG 4, C0ND 28, 1564' FSL & 378' FI4L SEC. 11 At top of productive interval 'I"1~1~, l~,t~¢ ~ ~ 9966' HD 5285' FSL & 2095' FI4L SEC. 11, T8N, R1314, Sl~ At effective dept~ 10,800' HD, 5699' FSL & 1935' F~/L SEC. 11, T8N, R13~/, SR At total depth 10,900' HD, 5743' FSL & 1910' F~/L SE(;. 11, TSN, R13~/, SH Stimulate Other "6. DatUm elevation (I)F or KB) 116' DF feet 7. Unit or Property name NIDDLE GROUND SHOAL 8. Well number A24-01 9. Permit number 73-38 10. APl number ~0- 50-733-20258-00 11. Field/Pool HGS "G" POOL 12. Present well condition summary Total depth: measured 10,900 feet true vertical 9482 feet Effective depth: measured 10,800 feet true vertical 9396 feet Plugs (measured) J~nk(measured) 10,569' UNDERREARER FISH Casing Length Size Cemented Structural Conductor 370' 20" surface 2010' 13-3/8") 6~~, 1300 SX Intermediate k;-~$ Production 10,888' 7",29#,~v-so 2100 SX Liner Perforation depth: measured 9663'- 10,534' (10 INTERVALS) Measured depth 370' 2010' 10,888' True venial depth 370' 1832' 9472' true vertical Tubing (size. grade, and measured depth) 3-1/2", 9.3#, N-80 EUE 8RD 0 9888' Gas Cons. C0mm'ts¢~ Packers and SSSV (type and measured depth) GUIBERSON UNI-PKR VII @ 9846', BAKER FV-6 TRSCSSV e 304' 13. Attachments Description summary of proposal X Detailed operations program sketch 14. Estimated date for commencing operation 2-20-95 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: ~1 X Gas Service Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (//-/~C~,..~/,),2~ ~'~ G. S. NADY Title .GR- ASSET AD. IN. FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ..... ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10- ~ O~ Date 1/19/95 [Appr oval No.?~.~-" Approved by order of the Commission original Signed By Oavid W. Johnston Approved Copy ~R/~c?med Date c~// Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE MIDDLE GROUND SHOAL A24-01 ABANDONMENT OF EXISTING HEMLOCK PERFORATIONS Plan Abandon the "G" Pool by setting a cement plug across the existing perforations. Procedure 1. Move to A24-01 (leg 4, conductor 28) and rig up. 2. Kill well. 3. Nipple up 5,000 psi BOP stack and test. 4. Pull tubing and packer completion equipment. 5. GIH with bit and scraper and clean out to TD at approximately 10,569'. 6. Set a cement plug across the Hemlock perforations from TD to 9,500'MD-KB. 7. GIH and clean out cement to 9,966'MD-KB. 8. Use wireline and GR to set a bridge plug at 9,966'MD-KB. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~, GAS [] SUSPENDED [] ABANDONED [] SERVICE [] .... 2. Name of Operator ~]'K~I~' 7. Permit Number Shell Western E&P Inc. ~~,~i 73-38/94-047 3. Address ~ 8. APl Number 130 Trading Bay Suite 310 Kenai, AK 99611l.~ 50-733-20258-00 4. Location of well at surface ............ 9. Unit or Lease Name Platform "A", Leg 4, Conductor 28, 1564'N & Middle Ground Shoal 378'W of SE corner of Sec. 11, T8N, R13W, S M. At Top Producing Interval ' 10. Weil Number 9663' (M.D.), 5122'N & 2129'E of SE corner of A24-01 Section 11, T8N, R13W, S.M. "1 At Total Depth; 13W10R90O'S-.-M% '(M'D'/' 5743'N & 1910'E of SE corner 11.FieldandPool of Section 11, T8N , ,, 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. MGS/ "F" & "G" Pool 116' DFI ADL 18754 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. 15. Water Depth, if offshore 116' No. of Completions 2-15-74 4-12-74 4-22-74 / 3-31-94 feet MSL 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth whereSSSV set 21. Thickness of Permafrost 10,900 (9486) 10,559 (919Z) j YES [] NO []I 304 feet MD 22. Type Electric or Other Logs Run 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 61# K-55 Surface 2010' 17-]/2" 1~0~ .qw Nnn~ . 7" 29# N-80 Surface 10888' 9-7/8" 2]00 I , , 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) interval, size and_number) GR-GS 9663' - 9686' HN-HR 10390'-10475' 2-7/R" ~.$~ g 19':1 ' c) 1S2' GR-GS 9686' _ 9720' HN_HR 10500'-10534' HC-HD 9966' - 10026' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. HC-HD 10050' - 10091' DEPTH INTERVAL (MD) AMOUNt-& KIND OF MATERIAL USED HE-HF 10113' - 10133' HI-HK 10187' - 10215' HK-HN 10245' - 10295' HK-HN 10306' - 10366' 27. PRODUCTION TEST ,. Date First Production J Method of Operation (Flowing, gas lift, etc.) 03/31/94J Gas lift Date'°f Test Hours Tested PRoDuCTION FOR OIL-BBL GAS-MCF wATER-BBL CHOKE SIZE IGAS-OIL RATIO 8/29/94 24 TEST PERIOD ~ 54 8,5 46 I PRJ .1 ~?A .... Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (c~r)' ' Press- 100 640 . 24.:HOUR RATE I~ 54 85 46 .. 28. CORE DATA "' apparent presence gas water, chips. Brief description of lithology, porosity, fractures, dips and of oil, or Submit core ORIGINAL Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS I-ORMATION TESTS. NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. , 31. LIST OF ATTACHMENTS Morning reports, wellbore diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. item 27' Method of Operation' F!o~Vingl Gas Lift,' Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 From: EP388TAR--VM35 To: ~P381~F--VM35 A A FO~,ESONG EP38DLM --VM35 D ' MARSHALL From: TOM REESE Subject: A24-01 ON 8-28-94. RETRIEVE PERF GUNS. RIH WITH 2.25 OVERSHOT FISHING TOOL. GOT FRICTION HOLD OF PERF GUNS, BUT COULD NOT STAY LATCHED ON. POOH TO CHECK TOOL. RIH WITH 2.25 OVERSHOT FISHING TOOL. GOT FRICTION HOLD OF PERF GUNS AT 6532 (WLM) . COULD NOT STAY LATCHED ONTO PERF GUNS. HAD TO JAR DOWN SEVERAL TIMES JUST TO GET FRICTION HOLD ON PERF GUNS. POOH TO CHECK TOOL. HAD ABOUT 2" OF PERF GUNS. MUST BE EITHER BREAKING UP OR WADDING UP PERF GUNS. RIG DOWN AND REGROUP. LAST PRODUCTION TEST WAS AS FOLLOWS: GROSS 100; CUT 46; CLEAN 54; INJ 1042; PROD 85; GOR 1574; TBG 100; CSG 640; SCP 16; H2S 13. Date and time 08/29/94 09:53:59 END OF NOTE - 1 - 13-3/8' SURFACE CASING at 2010' 61# K-66 CEMENTED w/ 1300 ex 'G' P ERffORATIONS.- MGS A24-01 PRESENT STATUS - 9/26/94 GR-GS 9663' -9686' GR-GS 9686' -9720' HC-HD 9966' -10026' HC-HD 10050' -10091' HE-HF 10113' - 10133' HI-HK 10187' - 10215' HK-HN 10245' -10295' HK-HN 10306' -10366' HN-HR 10390' -10475' HN-HR 10500' -10534' 7' PRODUCTION CASING at 10888' 0-10888' 29# N-80 BTC Underreamer fish · 10559' PBTD at 10559' WAM/A2401.CHT BAKER FV-6 TRSCSSV at 304' (2.313 Profile) 24' CONDUCTOR at 370' MANDREL at 2138' MANDREL at 4016' MANDREL at 5488' MANDREL at 6576' *-31' STRIP PERF GUN STUCK in GLM#4** MANDREL at 7412' MANDREL at 7995' MANDREL at 8547' MANDREL at 9066' 'X' NIPPLE at 9113' BAKER 'HB' PACKER at 9152'(Center) 'XN' NIPPLE at 9191' WLREG at 9193' EOT at 9193' (2-7/8' 6.5# N-80 EUE 8RD) S F_P ?-8 't99~ Gas Cons. Commission Anchorage PROFS Note June 9, 1994 Page 1 From: EP388TAR--VM35 To: EP383RGB--VM35 EP388MAJ--VM35 R G BLACKBURN W A MILLER Date and time EP38PTH --VM35 EP38DLM --VM35 06/07/.94 18'08:33 P T HUCKABEE D L MARSHALL From: TOM REESE Subject: ~ ON 6-7-94. CHANGE-OUT TOP GAS-LIFT VALVE. EQUALIZED WELL. AFTER EQUALIZING WELL I NOTICED THAT CASING PRESSURE HAD DROPPED TO 700#. IT SHOULD NOT DROP THAT FAR AFTER EQUALIZING. LEFT EQUALING HOSE OPEN TO OBSERVEAFTER PULLING GAS-LIFT VALVE. RIH AND PULLED 1" GAS-LIFT VALVE FROM 2117 (WLH). CASING DROPPED TO 300# AND TUBING ONLY DROPPED TO 600#. NOT POSSIBLE UNDER NORMAL CIRCUMSTANCES. RIH WITH 1" DANIELS GAS-LIFT VALVE SET AT 950# WITH 3/16" PORT. SET GAS-LIFT VALVE AT 2117 {WLM). BLEED CASING DOWN TO SEE IF IT WOULD BLEED OFF. IT BLEED OFF IN 1 MINUTE, WHICH INDICATES THAT THE CASING IS PLUGGED CLOSE TO SURFACE. PUMPED METFLANOL DOWN CASING. LET SET FOR 30 MINUTES. CASING PRESSURE DROPPED FROM 960# TO 850#. PUT INJECTION GAS TO WELL. STARTED TAKING GAS. INJECTED METHANOL WITH THE GAS. PUT WELL ON PRODUCTION. WELL IS FLOWING AT THIS TIME. LAST PRODUCTION TEST WAS AS FOLLOWS: GROSS 128; CUT 48; CLEAN 67; INJ 959: PROD 157; GOR 2359; TBG 100; CSG 610; H2S 18; SCP 6. END OF NOTE Ak~sl~ Oki & Gas Cons. Corniness'mn June g, 1994 ~--~ PROFS Note ~'~ Page I From: EP388TAR--VM35 To: EP383RGB--VM35 EP388MAJ--VM35 R G BLACKBURN W A MILLER Date and time EP38PTH --VM35 EP38DLM --VM35 06/0.6/94 10:15:53 P T 'HUCKABEE D L MARSHALL From: TOM REESE Subject: ~ ON 6-5-94. FISH PERF GUNS. RIH WITH MODIFIED 2.29 OVERSHOT WITH 2.0" GRAPPLE. LATCHED FISH AT 6532 (WLM). JARRED 7 TIMES TO 2350 (WU~). PO(04. RECOVERED MPD ANO PART OF X-OVER TO PERF GUNS. RIH WITH 2.25 OVERSHOT WITH 1.66 GRAPPLE. LATCHED FISH AT 6532 {WLM). JARRED 2 TIMES. POOH. NO FISH. RERAN 2.25 OVERSHOT WITH 1.66 GRAPPLE. LATCHED FISH AT 6532 (WLM). JARRED 5 TIMES TO 2200#. SLIPPED OFF. COULD NOT LATCH FISH AGAIN. POOH. RERAN 2.25 OVERSHOT WITH 1.66 GRAPPLE. COULD NOT LATCH FISH AT 6532 (WLM). RIH WITH 2.29 OVERSHOT WITH 1.90 GRAPPLE. LATCHED FISH AT 6532 {WLM). JARRED 20 TIMES TO 2500#. POOH. HAD TOP OF PERF GUN CONNECTION. LEFT IN HOLE IS THE 31' OF STRIP GUN. WELL HAS BEEN SHUT IN. END OF NOTE PROFS Note April 22, 1994 Page I From: EP388TAR--VM35 To: EP383RGB--VM35 EP388MAJ--VM35 R G BLACKBURN W A MILLER Date and time EP38PTH --VM35 EP38DLM --VM35 04,A1~/.94 10:30:40 P T HUCKABEE D L MARSHALL From: TOM REESE Subject: ALI~I~-It ON 4-10-94. FISH PERF GUNS. RIH WITH 1 5/8" JDC PULLING TOOL. FOUND TOP OF PERF GUNS AT 6689 (WLM). PULLED UP HOLE TO 6550 (WLM). SLIPPED OFF. TOOLS FELL DOWN HOLE TO 7240 (WLM). POOH TO CHECK TOOL. RIH WITH 1 5/8" JDC PULLING TOOL. FOUND TOP OF PERF GUNS AT 7240 (WLM). JARRED UP HOLE TO 7108 (WLM).SLIPPED OFF. RIH WITH 1 29/32" OVERSHOT AND 1 1/2" ROPE SOCKET ON 2" JDC PULLING TOOL. FOUND PERF GUNS AT 7320 (WLM). JARRED FOR 10 MINUTES. SHEARED PIN. RIH WITH 2" JDC PULLING TOOL. FOUND PERF GUNS AT 7352 (WLM). JARRED UP HOLE TO 6532 (WLM). JARRED FOR 2 HOURS. COULD NOT MOVE. SHEARED OFF. FISHING TOOL LATCHED ONTO PERF GUNS IS 44" LONG WITH MAXIMUM OD OF I 29/32". DIAGRAM IN WIRELINE LOG BOOK. NO PRODUCTION DATA DUE TO THE FACT THAT I WAS ON PLATFORM A AT TIME OF REPORT. END OF NOTE ~\tsY,~ Okk ~k G~S Gons. Gomm'~ss'm~ DNLY REPORT P~TFORM: A ~: ~4-01 31-M~-~ FOREM~: R.H. SEL~ "~/' ' A~H: $2~,~ ONLY: $750.00 CUMU~TI~: $259~ DAI ~: .... 0 ~1 ~D: .... 1 DAY & DAYS ES~MA~D: 12.~ OF!6 COM~NTS: NO ACCIDENTS REPOR~ FLUID ~E: PRODUCTION ~I~T: DAYS ~~~ LTA .... ~ SPI~: NO SPI~S REaReD RT TO ~G ~GER: ~.50' TOF: 10,~' TIME ~D 0UMM~Y OF OPERATIONS: I 7.~ HRS - P~F~ATE ~ PO~ (GR-GS) RUN #2 ..-.,.2..!/8'. RETRIEVABLE STRIP PHASED ENERJET 6 SPF ~": -'SHOOT ~,~, :~'i~'-;~ "':' NOTE;" WHILE' COMING OUT W/SPENT PERF GUN, TOOL BECAME STUCK IN GLM #4 es~ - WORLD TOOL SEV~R~. HRS ~. ATTEMPT TO PULL FREE - NO LUCK - PUU-i 2650 FT LB AND PULL OFF AT WEAK POINT - il=irT IN HOLE; 1 3/8' ROPE SOCKET, 1 11/16' v~rl' BAR, COLLAR LOGATOR, 2' MAGNET, 2 1/8' SPENT RETRIEV EJ GUN - TOTAL LENGTH OF FISH 48.35' RECEIVED SEP 2 8 19~4 ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS FTC Alaska 0it & Gas Cons Gommtssto Anchora,~o · SWEPI SUPERVISION & LABOR: CONTRACT SERVICES: A.CONTRACT CREW + RS&D B..CATERING C..FISHING D..CEMENTING E..STIMULATION, OTHER PUMPING F..PRODUCTION EQUIP SERVICES G..PERFORATING H..PACKER, PLUG ~'TTING I..LOGGING, OTHER ELECTRIC MNE J..SMCKM~, BRAIDED MNE K..WELLHEAD SER~CE L.OTHER SERVICE (TONG OP.) TOTAL CONTRACT SERVICES 'SUMMARY OF DAILY COST' $7S0.00 $0.00 $o.oo MATERIALS: /L.SWEPI PURCHASED RIG SUPPUE~ B..WORKOVER FLUIDS & ADDITIVESi C..PACKER, SSS'V, CONTROL UNE D..BRIDGE PLUGS, RETAINERS, EZS;V E..TUBING, PUPS, COUPUNGS, X-O',' F..GAS UFT MANDRELS & VALVES G..X- & XN NIPPLES H..WEUJ-IEAD EQUtPMENT I..BOP, KOOMY, CHOKE PARTS L..OTHER MATERIALS PLUS FUEL TOTAL MATERIALS WORK STRING RENTAL (DP/DC/JARS TOOLS, SUPS, ELEV RENTAL SPECIAL TOOLS FTC RENTAL OTHER RENTAL TRANSPORTATION: FIXED COST TRANSPORTATION: ALL OTHER TOTAL TRANSPORTATION COST $0.00 TOTAL RENTALS $0.00 · gO/;O'cl ~ 1:1..-I0 3NU Oi ti tu~o~.$elcl I laqS l~3~ld Wc~£:80 £0 '-d qUiOi DNLY RE~RT P~TFORM: A ~ ~4-01 30-Mar-~ FOREM~: R.H. ~L~ ~; ~667 ENGINE~: P. T. HUC~EE A~H: $2~,~ DNLY: $750.~ CUM~TI~: DAI ~D: .... 0 ~1 ~D: .... I DAY & DAYS ', COM~S: ~ ~CIDENTS REPOR~ FLUID ~E: ~ODUC~ON DAYS WI~O~ LTA .... ~2 SPI~: NO SPILLS REPOR~D RTTO ~G H~GER: ~.~' jTOF: Ti~ ~D SUMM~Y OF O~ATIONS: 20 ERS - R~ SCHL~B~GER TO PERFORA~ '~ P~L (GR-GS) CORR~ TO SCHLUMB~GERS DENSI~ LOG (4-13-94) & COMP~ON RECORD' RUN ~1 - 2 1/8 R~I~~ Sm~P PHASED ENERJET 6 SPF 96~' - 97~' ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... SWEPI SUIF..RVlSlON & LABOR: CONIl~CT SERVICES: A..CONTRACT CREW + R~&D B..CATERING C..FI~HING D..CEMENTING E..STIMULATION, OTHER PUMPING F,.PRODUCTION EQUIP SERVICES G..PERFORATING H..PACKER, PLUG SETTING I..LOC-,GING, OTHER ELECTRIC UNE J..SUCKUNE, BRAIDED UNE L..OTHER ~ERVICE (TONG OP.) TOTAL CONTRACT SERVICES TRANSPORTATION: FIXED COST TRANSPORTATION: ALL OTHER TOTAL TRANSPORTATION COST "SUMMARY OF DALLY COST' $750.00 $o.oo $0.00 MATERIALS: A..SWEPI PURCHASED RIG SUPPLIES SO. DO B..WORKOVER FLUIDS & ADDITIVES C..PACKER, SSSV, CONTROL UNE D.BRIDGE PLUGS, RETAINERS. EZS¥ $0.00 E..TUBING. PUPS, COUPLINGS, X-Of,' F..GA$ UP-i' MANDRELS & VALVES $0.00 G..X- & XN NIPPLES SO.00 H..WELLHEAD EQUIPMENT SO.DO I..BOP, KOOMY, CHOKE PARTS L..OTHER MATERIALS PLUS FUEL TOTAL MATERIALS : SO.O0 I WORK STRING RENTAL (DP/DC/JARS)[ SO.DO TOOLS. SUPS, ELEV RENTAL SO.O0 SPECIAL TOOLS UTC RENTAL SO.DO OTHER RENTAL SO.DO TOTAL RENTALS c~0/£0' 8 =ID I ~13 DN~ 0.1. *; ~-~ DALLY REPORT *; PLATFORM~ A WELL: A24-01 25-Mar-94 FOREMAN: R.V. WELLS ENGINEER: F. T. HUCKABEE ~'AFE: 26366T "AUTH:$260;,000 DALLY: $57,854.00 CUMULATIVE: $257,894''~ · ~' D~! ~TD: .... 0 IRI 5q'D: .... 1 DAY & DAYS ESI~MATED: = COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4 ~ DAYS WITHOUT LTA~... 357 '; SPILLS: NQ SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559' *; TIME AND S.'UMMARY OF OPERATIONS: 18 HRS- FINISH TEARING OUT RIG FOR MOVE T/LEG #2. CLEANING PITS AND INJECTED FLUIDS DOWN DISPOSAL WELL *; 18 HRS TOTAL THIS REPORT. RIG RELEASED AT 2400 HRS 03/24/94 FROM A2¢-01 ...~CCEPTED ON A31 -14LW '~IOTE: TODAYS HIGH COST REFLECTS $45,014 FOR NEW 2 7/8' TUBING. ......................... SWEPI SUPERVISION & I.A~OR: CONTRACT~,, ~CE$: A..CONTRACT CREW + RS&D B**CATERING C..FISHING D..CEMEN.,TING E.,STIMUI.~TION, OTHER PUMPING F..PRoOUCTION EQUIP SERVICES G..PERFOI~TING H..PACKER, PLUG SETTING I..LOGGING, OTHER ELECTRIC MNE J.;SUCKLINE, BRAIDED UNE L.OTHER SERVICE {TONG OP.) TOTAL CONTRACT SERVICES TRANSPOI TRANSPOI TOTAL. TRA qTATION: FIXED COST ~TATION: ALL OTHER ~$PORTATION COST $750.00 MATERIALS: $9,860.00 A..SWEPI PURCHASED RIG SUPPUES SO J30 $750.00 B..WORKOVER FLUIDS & ADDITIVES SO.00 $0.00 C..PACKER, SSSV, CONTROL UNE $0.00 $0.00 D..BRIDGE PLUGS, RETNNERS, EZSV SO.O0 '"- $0.00 E..TUBING, PUPS, COUPUNGS, X-O't $45,014~ $0.00 F..GAS MFT MANDRELS & VALVES $0.00 $0.00 G.J(- & XN NIPPLES $O.00 $0.130 H..WELLHEAD EQUIPMENT $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00 $480.00 L.OTHER MATERIALS PLUS FUEL $0.00 TOTAL MATERIALS $46,014.00 $11,090.00 WORK STRING RENTAL (DP/DC/JARS) SO.IX3 TOOLS, SLIPS, ELEV RENTAL $0.00 $0.00 SPECIAL TOOL8 ETC RENTAL $0.00 '" $0.00 OTHER RENTAL $0.00 $0.00 TOTAL RENTALS $0.00 '" TOTAL P.01 *= ~ DALLY REPORT ~' PLATFORM:. A WELL: A24-01 24,-Mar-94 FOREMAN: R.V. WELLS *; AFE: 26366;7 ENGINEER: P. T. HUCKABEE *; AUTH: $260,000 DALLY: $18,840.00 CUMULATIVE: $200,040 ::=_' DAI YTD: .... 0 TRI YI'D: .... I DAY & DAYS ESTIMATED: 10.5 OF COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: DAYS WITHOUT LTA.... 356 SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559' TIME AND SUMMARY OF OPERATIONS: 10 HRS- FINISH NIPPLE DOWN BOPE, REMOVED DOUBLE RAM AND ANULAR PREVENTOR FROM SUB. [NSTAt LFD TREE. TEST T/5000 PSI F/10 MINS, OK. REMOVE BPV. 4.5 HRS- RIG UP SECKUNE, PULLED PRONG/PLUG FROM "XN' NIPPLE. RIG DOWN SMCKLINE. 9.5 HR$- LAY DOWN 4 DRILL COLLARS AND JARS FROM DERRICK, TEARING OUT RIG F/MOVE. ~NOTE: PRODUCTION STRING WAS RAN EXACTLY AS REPORTED ON 19-MAR-94 REPORT. ~ ~DIHON~ COM~S; DRI~S, VISITORS, INSPE~ORS ETC... "SUMMARY OF DALLY COST' *: SWEPI SUPERVISION & LABOR: CONTRACT SERVICES: A;..CONTRACT CREW + RS&D B,.CATERING C..FISHING D..CEMENTING E..STIMULATION, OTHER PUMPING F.,PRODUCTION EQUIP SERVICES G..PERF~TING H..PACKI~, PLUG SE1-HNG I.,LOGGtN~; OTHER ELECTRIC LINE J..SMCKLINE, BRAIDED UNE K..WELLHE. AD SERVICE L..OTHER '.SERVICE (TONG OP.) TOTAL CON,taCT SERWCES TRANSPOI~ITATION: fiXED COST TRANSPOSTAllON: ALL OTHER TOTAL TRANSPORTATION COST $750.00 $750.00 $0.O0 $0.00 $480.00 $0.00 $17,090.00 $0.00 $0.00 $0.00 MATERIALS: A..SWEPI PURCHASED RIG SUPPUES B..WORKOVER FLUIDS & ADDITIVES C..PACKER, SSS',/, CONTROL UNE D..BRIDGE PLUGS, RETAINERS, EZSV E..TUBING, PUPS, COUPUNG$, F..GAS MFT MANDRELS & VAL¥1ES G.J(- & XN NIPPLES H..WELLHEAD EQUIPMENT i..BOP, KOOMY, CHOKE PARTS L.OTHER MATERIALS PLUS FUEL TOTAL MATER~N.S WORK STRING RENTAL (DP/DC/JARS) TOOLS, SUPS, ELEV RENTAL SPECIAL TOOLS ETC RENTAL OTHER RENTAL TOTAL RENTALS $1,000.00 =: $0o00" TOTAL P. 01 *~ ~--~ DALLY REPORT ~' PLATFORIVE A WELI~ A24-01 23-Mar-9~, FOREMAN: R.V. WELLS "AFE: 263667 ENGINEER: P. T. HUCKABEE ~- AUTH: $26q,000 DAILY: $38,S94.00 CUMUI~TJVE: $181,200 '~ .... , ~- DN YTD: .... o TRI YTD: ....1 DAY & DAYS ESTIMATED: 9.5 OF 6 ~. COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FtW WEI~: 8.4 *= DAYS WITHOUT LTA .... 355 ~. SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,5~9' TIME AND SUMMARY OF OPERATIONS: gECEIVE 1.0 NILS- TIN T/4~S6', TBG STOPPED, BEGAN PISTON EFF'EOT OF PUSHING FLUID OUT TB . *"2.0 HR$- SL,~FACE INDICATIONS ARE THAT THE PACKER ELEMENTS PINS SHEARED AGAIN. '; RIGGED UP SUCKUNE, RIH AND PULLED BOTTOM GAS UFT VALVE. RIG DN. ~.$.5 HRS- fiNISH TIH W/COMPLETION STRING OK. ~.2.0 HRS- ClflC WELL VOL T/CLEAN OUT WELL ~la~ka ~.4,0 HR$- RIG UP SUCKLINE, SET BTM GAS LIFT VALVE, SET PLUG/PRONG IN XN NIPPLE. '~2.0 HRS- TRY T/$ET PACKER W/TEST PUMP, NOT ABLE TO GET ENOUGH VOL TO CLOSE VAL~I~S. ~. RIG UP W/RIG PUMP ON TBG, PRESSURE UP T/2S00, SHUT DOWN PUMP, TBG BLED " OFF T/900 PSI, ANNULUS QUIT FLOWING THO. SURFACE INDICATIONS ARE THAT THE *: PACKER'SET OK BUT THE PLUG/PRONG IN THE XN NIPPLE IS NOT SEATED WELL. *'6.5 HRS- RIG UP SUCKUNE, PULLED FRONG/PLUG, REDRESS, RE-RAN THEM, SET IN XN NIPPLF_ ';1.0 HRS- PRESSURE UP TBG T/3500 PSi WrieST PUMP, OK. PRESSURED UP ANNULUS T/1200, OtC *;2.0 HRS- SET BPV IN TBG HANGER, NIPPUNG DOWN BOPE AT RPT TIME. '. 24.0 I~IRS- TOTAL ~- NOTE: DID NOT USE DRILL PIPE, DC'S OR DC SUPS/CLAMP ON 03/22, USED ALL ELSE. ~. ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... *MORN TOUR CREW HELD TRIP DRILL DURING WEEKLY ER DRILL. HAD H2S GAS ALARM. *1CRITIQUE OF DRILL FOUND THAT SOME PERSONEL DID NOT REAMZE THAT SOME AREA OF THE *PLATFORM uTJu~s UGHTS INSTEAD OF BELLS FOR AN ALARM DUE TO THE HIGH NOISE LEVEL THERF_ "SUMMARY OF DAILY COST' ~' swEPI SUPERVISION & LABOR: CONTRA ,GERVlCES: A..CONTR~CT CREW + RS~ B..CA~RI~G = D.,~ME~I~ ~ E..STIM~ON, O~R PUMPING ' F..~OOUC~ON E~P ~CES · , · ' I..L~IN~, O~R E~IC UNE . TRANSPOI~TATION: FIXED COST TRAN~oRrrATION: ALL OTHER TOTAL TRAI'~$PORTATION COST $750.00 MATERIALS: $9,860.00 A..SWEPI PURCHASED RIG SUPPLIES $0.0~ $750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00 S0.00 C,.PACKER, S~SV, CONTROL UNE $14,151.00 $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $4,914.00 $0.00 E..TUBING, PUPS, COUPLINGS, X-O", $0.00 $0.00 F..GAS UFT MANDRELS & VALVES $0.00 $0.00 G.~(- & XN NIPPLES $0.00 $6,68g.00 H..WELLHEAD EQUIPMENT $0.00 I..BOP, KOOMY, CHOKE P~J~TS $O.00 $480.~ L.OTHER MATERIALS PLUS FUEL $0.00 TOTAL MATERIALS $20,06,5.00 $17,779.00 WORK STRING RENTAL (DP/DC/JARS) $0.00 TOOLS, SUPS, ELEV RENTAL $0.00 SPECIAL TOOLS ETC RENTAL $0.00 OTHER RENTAL $0.00 TOTAL RENTALS $0.00 TOTAL P,01 DALLY REPORT ~. PLATFORM: A WELL; A2¢-01 22-Mar-94 FOREMAN: R.V. WELLS ~' Al=E: 263667 ENGINEt~t: P. 1'. HUCI~E ~. AUTH: $260.I300 DAILY: $26,187.00 CUMULATIVE: $142,606 ' "/' ~' ~' DAI YTD: .... 0' TRI YTD: .... I DAY & DAYS ESTIMATED: 8.5 OF 6 *' COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FtW WEIGHT: 8.4 '; DAYS WITHOUT LT/L... 354 ~- SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559' '"- TIME AND SUMMARY OF OPERATIONS: 2.5 HRS- FINISHED TESTING BOPE. /tO ~/~,~ 2.5 I-IRS- RETR~D STROM PACKER FROM 85', TIH AND LATCH ONTO flElP. ' 2.5 HRS- CIRCOUT OIL/GAS FROM UNDER RBP. ~ 4.0 I-IRS- POH, LAY DOWN RBP AND PULLING TOOL. /i/,~,,, O~C/~ 1.5 HRS- REMOVE 3 1/2' RAMS, INSTALL 2 7/8" PIPE RAMS, TEST. OK. °va ~?~ 11 0 HR$- RIG TSG TONGS, TIH W/PRODUCTION STRING T/2700', WELL KICKED THRU ~r ~. ' TBG. SECURE WELL, CIRC OUT OILY RETURNS THRU GAS BUSTER. UNABLE TO ~/?/~ CONTINUE ON IN HOLE DUE TO PISTON ACTION OF THE PACKER, APPEARS SOMETHING[U~. IS WRONG WITH THE PACKER. POH W/PACKER AND FOUND THE ELEMENTS SHEAR PINS WERE SHEARED. SUSPECT THE KICK DID IT. REDRESS W/NEW PINS, AND TIH AT RPT TIME. ' 24.0 HRS TOTAL *NOTE: USED ALL RENTAL TOOLS LESS DC'S, DC SUPS AND CLAMP 03/21. (DID NOT USE DRILL PIPE OR DC'S, DC SUPS/CLAMP ON 03/22) ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... "~VE TOUR CREW HELD TRIP DRILL AT 1505 HRS, HAD REAL KICK AT 2230 HRS. DID GOOD! 'SUMMARY OF DAILY COST' SWEPI SUPER[VISION & LABOR: CONTRACT SERVICES; ~..CONTRACT CREW + RS&D B..CATERING C,.FISHING D..CEMENTING E..STIMULATION, OTHER PUMPING F..PRODUCTION EQUIP SERVICES G..PERFORAT1NG H..PACKER, PLUG SETTING I..LOGGING, OTHER ELECTRIC UNE J..SLJCKMNE~ BRAIDED MNE K..WEM.HEAD SERVICE L..OTHER SERVI~ (TONG OP.) TOTAL CO,CT SERVICES I $750.00 MATERIALS: $9,860.00 /~.SWEPI PURCHASED RIG SUPPLIES $750.00 B..WORKOVER FLUIDS & ADDITIVES SOJX) $0.oo C..PACKERS $0.03 $0.00 D..BRIDGE PLUGS, RETAINERS, F_~SV SO.gO SO.go E..TUBING, PUPS, COUPLINGS, X-O", SO.go $0.00 F..GAS EFT MANDRELS & VALVES SO.go SO.go G.~(- & XN NIPPLES $0.00 SO.gO H..WELLHEAD EQUIP, 'AP' SPOOL $13,47g.00 $0.00 I..BOP, KOOMY, CHOKE PARTS SO.gO $480.~ L..OTHER MATERIALS PLUS FUEL $1,000.gO $O.00 TOTAL MATERIALS $14,479.00 $11,090.00 WORK STRING RENTAL (DP/DC/JARS) SO.gO TOOLS, SUPS, ELEV RENTAL SO.gO TRANSPOI~TATION: FIXED COST $0.00 SPECIAL TOOLS ETC RENTAL SO.go TM *' TRANSPORTATION.' ALL OTHER SO.go OTHER RENTAL: TEST PLUG ($132.go)~' ": TOTAL TRAI~ISPORTATION COST SO.00 TOTAL RENTALS ($1~12.00)*' TDTRL P.O1 *' " "'~' DALLY REPORT *' PLATFORM~ A WELL: A2A-01 21-Mar-94 FOREMAN: R.V. WELLS *' AFE: 263667 ENGINEER: P. T. HUCKA~F:E ' AUTH: $26q,000 DAILY: $7,902.00 CUMULATIVE: ~ DAI YTD: .... i0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: 7.5 OF 6 *" COMMENTS,: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4 ~' DAYS WITHpUT LTA .... 853 *~ SPILLS: NO. SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559' TIME. AND ~UMM.N~Y OF OPERATIONS: 2.0 HRS- FINISH POH W/PRODUCTION STRING. 2.0 HRS- CHANGED RAMS FROM 2 7/8' T/3 1/2". TEST DOOR SEALS, FUNCTION TEST RAMS. *', 10.0 HR$- ~-UP BAKER RETRIEVEABLE BRIDGE TOOL ON RUNNING TOOL TIH ANO *' SET i~T AT 9795'. TEST T/1000 PSI, OK. *' 2.0 HRS- CI~C OUT OILY/GASSY FLUIDS ABOVE RBP. PUL~FD 23 STANDS. ~' 1.0 i-IRS- M,AKE UP BAKER STORM PACKER AND SET AT 85' W/KILL STRING UNDERNEATH. '". 7.5 HRS- HE~I.D PRE-JOB SAFETY/OPERATIONS MEETING, NIPPLED DOWN BOPE, REMOVED DCB ~SPOOL, INSTAJ f FO NEW 11'5M X 13 5/8" 3M 'AP' SPOOL, NIPPLE UP BOPE. *' 4.0 HRS- TESTING BOPE PER REQUIREMENTS AT RPT TIME. ~' 24.0 HRS TOTAL - *'NOTE: USED AIL RENTAL TOOL LESS DC'S, DC SLIPS AND CLAMP 03/20-21/94. *'NOTE: MADE A CORRECTION IN FUEL COST, DOUBLE DIPPED ON THE ADJUSTMENT OF 3/19-20 ! ADDITIONAE COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... .... ~ ........................................................... .._-~-.~ ........... ~. ...... *; 'SUMM/~Y OF DAILY COST' ~' SWEpI SUPERVISION & LABOR. $750.00 *' CONTRACT SERVICES: MATERIALS: L..OTHER ~ TOTAL CON' *; TRANSPOR TRANGPOR TOTAt. TRAJ~ ~..¢ONTmAIC? CREW + R,S~D B..CATERING C..FISHI~ D..~ME~ING E..S~M~ON, OTH~ F..PRODUC ~ON EQUIP SER~CES G..PERFOR ~NG , H..PAC~, PL~ S~ING I..LOGGING O~R E~C~IC LINE J..SUC~, B~D UNE K..~~ ~. SER~CE ~VlCE ~ONG OP.) , RACT ~R~CES rA~ON: F~D COST rATION: ~ OTHER SPORTATION COST $9,860.00 A..SWEPI PURCHASED RIG 8UPPUE8 S0.1X) $750.00 B..WORKOVER FLUIDS & ADDITIVES $0,00 *'- $0.00 C..PACKERS $0.00 *; $0.00 D..BRIDGE PLUGS, RETAINERS, F..ZSV $0.00 ''"- $0.00 E..TUBING, PUPS, COUPUNG$, X-O',~ $0~00 '" $0.00 F..GAS UFT MANDRELS & VALVES $0.(30 ~'- $0.00 G..X-- & XN NIPPLES $0.00 ': $0.00 H..WELLHEAD EQUIPMENT $O.00 ~- $0.00 i..BOP, KOOMY, CHOKE PARTS $0.00 '" $1,440.00 L..OTHER MATERIALS PLUS FUEL ($4,931.00)"' $0.00 TOTAL MATERIALS ($4,931,tX:1)"' $0.00 *' $12,050.00 WORK STRING RENTAL (DP/DC/JARS) $0.00 ~ TOOLS, SLIPS, ELEV RENTAL $0.00 *~ $0.00 SPECIAL TOOLS ETC RENTAL $0.(30 *' $0.00 OTHER RENTAL: TEST PLUG $33.00 =~ $0.00 TOTAL RENTALS S33.00 ~. TOTmqL P. 81 DAILY REPORT PLATFORM: A WELl; A24-01 20-Mar-94 FOREMAN: R.V. AFL: 263667 ENGINEER: P. T. AUTH: $260,000 DALLY: $29,731.00 CUMULATIVE: DAI YTD: .... 0 TRI YTD: .... I DAY & DAYS ESTIMATE[ COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW DAYS WITHOUT LT~-... 352 SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 31 TIME AND SUMMARY OF OPERATIONS: 1.5 HR$- FINISH CIRC HOLE CLEAN. 4.0 HR8- DRAIN STACK, LAND TBG HANGER. RIG UP SLICKLINE, SET PLUG/PRC NG IN XN NIPPLE. 9.5 HR$- RIG UP TEST PUMP, PRESSURE UP T/2500 PSI T/SET PACKER, PRESStJRE ON UP PSI F/TBG TEST. OK. PRESSURE UP ON ANNLUS TO ASSURE PACKER W~S SET BU~THE TBG HANGER LEAKED. CLOSED ANNULAR PREVENTOR, PRESSURE UP ALCOVE TBG HANGER, IT STILL LEAKED OFF BADLY. ASSURE HANGER WAS SEATED PROPERLY, ~r w/ts.' PRESSURED UP ABOVE AND BELOW TBG HANGER SIMULTANOUSLY T/I(XO PSI TO ASSURE PACKER WAS SET, IT WAS. BLED OFF PRESSURES. ADDED 5 STIC;KS OF PLASTIC PACKING T/TBG HANGER PACK-OFF, STILL LEAKS. DETERMINATION IS '. THE DCB SPOOL IS DAMAGED BEYOND ACCEPTABLE SERVICE..MUST REP LACE IT. · *; RIG UP SUCKUNE, PULLED BOTTON GAS UFT VALVE, PRONG/PLUG. · 5.0 HRS- BACKED OUT TBG HANGER SET SCREWS, UNSEAT PACKER, ClRC OU OIL/GAS 3{JPROOi 4.0 HRS- POH W/TOG AT RPT TIME. {TOOK 55K TO UNSEAT PACKER) -- '. 24 HR$- TOTAL · 'SUMMARY OF DAILY COST' · · , TRANSPORTATION: FIXED COST SWEPI SUPERVISION & LABOR: CONTRACT SERVICES: ~L.CONTRACT CREW + RS&D B..CATERING C..FISHING D,,CEMENTING E..STIMULATION, OTHER PUMPING F..PRODUCTION EQUIP SERVICES G..PERFORATING H..PACKER, PLUG SETTING I..LOGGING, OTHER ELECTRIC LINE J..SLICKI.INE, BRAIDED LINE K..WELLHEAD SERVICE L.OTHER ~RVICE (TONG OP.) TOTAL CONTRACT SERVICES TRANSPORTATION: ALL OTHER TOTAL TRANSPORTATION COST $750.00 $9,860.00 $7S0.00 $0.00 $0.00 $0.00 $0.00 $7,325.00 $17.933.00 $0.00 $0.00 $0.00 MATERIALS: ~,.SWEPI PURCHASED B..WORKOVER FLUIDS C..PACKERS D..BRIDGE PLUGS, RET E..TUBING, PUPS. COUI F..GAS LIFT MANDRELS G..X- & XN NIPPLES fiG SUPPLIEs ADDITIVES JNERS, EZSV 'UNGS, I & VALVES ~ H..WELLHEAD EQUIPMI~NT · I..BOP, KOOMY. CHOKEJPARTS I_.OTHER MATERIALS P~.US FUEL TOTAL MATERIALS j WORK STRING RENTAL ([)PjDC/JAR~) TOOLS. SUPS, ELEV RENTAL SPECIAL TOOLS ETC RECITAL OTHER RENTAL: TEST PLUG TOTAL RENTALS !i$s94.00 ' " $0.00 ~ , · $0.00" $;6,931.00 *' $~S,s2s.oo ~. !$992.00 ~' ~ $0.00 *' $~t,523.00" TO/TO'd Iblq~ 01 U ~J°~)gTd TTOqS ~d Ld~:~O t~66T-£~-60 "' ~'~ DAILY REPORT '~"'~ "; PLATFORM: A WELL: A2.4-01 19-Mar-94 FOREMAN: R.V. WELLS *' Ar-E: 263667 ENGINEER: P. T. HUCKABEE *; AUTH: $260.~ DAILY: " . $17,345.00 CUMULATIVE: $81,17S ~- DAf YTD: .... 0 TRI YTD: ..... I DAY & DAYS ESTIMATED: 5.5 OF 6 COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: DAYS WITHOUT LTA .... :351 SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,$69' TIME AND ~UMM,aRY OF OPERATIONS: 1.5 HRS- FINISH STAGE IN HOLE T/9204' W/T' CASING SCRAPER ON BIT. 2.0 HRS- ClRC VISCOU~ SWEEP AROUND T/CLEAN HOLE. 3.5 HR$- POH W/BIT, SCRAPER, BIT SUB. 4 DC'S, JARS. 2.5 HI:iS- REMOVE 3' RAMS, INSTALL 2 7/8' RAMS AND TEST 250 LOW/S000 H! OK. 1.5 HR$- HELD PRE-JOB SAFETY MEETING, RIGGED UP T/RUN PRODUCTION STRING. 10.5 HR$- TBG DETAILED: WI.REG AT 9193', "XN" NIPPLE AT 9191'. BAKER '!-I~' PACKER AT g152', (CENTER OF PACKER) "X" NIPPLE AT 9113', 8 GLM'S AT 9066', 8547', 7995', 7412', 6576', 5488', 4016', 2138', AND THE BAKER FY-6 TRS $SSV W/2.313 PROFILE AT 304' (FLAPPER DEPTH). RAN:TOTAL OF 285 JTS 2 7/8' 6.5# N-80 EUE 8RD TBG. NO PUPS UNDER HANGER. UP WEIGHT IS 105K, DOWN IS 95K. THERE AClE 9 BANDS ON CONTROL UNE. THE HANGi~ IS 3 1/2' 8RD SO THERE I$ AX-OVER FROM IT TO TUBING. 2.5 t-IRS- WITH 'rBG HANGER JUST OFF SEAT, CIRC FIW AT 2 BBL/MIN AT RPT TIME. 24 I-IRS- TOTAL I .......... i~i~!i!ill ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC "SUMMARY OF DAILY COST' <;~' '~'~' SINEPI SUPERVISION & LABOR: $7s0.0o *~ CONTRACT SER~CES: A..CONTRAC~ CREW + RS&D e. B..CATERING C..FISHIN~ *=' D.,CEMEN~NG E..STIMUI.~TION, OTHER PUMPING F. JaF:iODU~Vl'ION EQUIP SERVICES G..PERFORRTING H..PACKER, PLUG SETTING I..LOGGING, OTHER ELECTRIC UNE J..SUCKUNE, BRAIDED UNE K..WELLHEAD SERVICE L.OTHER :SERVICE (TONG OP.) TOTAL CONTRACT SERVICES TRANSPOR TOT rATION: FIXED COST rATION: ALL OTHER SPORTATION COST MATERIALS: $9,860.00 A..SWEP! PURCHASED RIG SUPPUE$ $0.00 $750.00 B..WORKOVER FLUIDS & ADDIT~VES $0.00 $0.00 C..PACKERS $0.00 $0.00 D..BRIDGE PLUGS. RETAINERS, EZSV $0.00 $0.00 E..TUBING, PUPS, COUPUNGS, X-O'; $21.00 $0.130 F..GA~ LIFT MANDRELS & VALVES SO.tX) SO.00 G..X- & XN NIPPLES S0.1X) $0.00 H..WELLHEAD EQUIPMENT SO.00 I..BOP, KOOMY, CHOKE PART~ SO.lX) $0.00 L..OTHER MATERIALS PLU~ FUEL $5,931.00 $0.130 TOTAL MATERIALS $5,952.00 $10,610.00 WORK STRING RENTAL SO.00 TOOLS, SUPS, ELEV RENTAL $0.00 $0.00 SPECIAL TOOLS ETC RENTAL $0.00 $0.00 OTHER RENTAL: TEST PLUG $33.00 $0.00 TOTAL RENTALS $33.00 TOTAl_ P.01 ~"'"' DAILY REPORT "'"~ PLATFORM~ A WELt; A26-01 18-Mar-9a, FOREMAN: R.V. WELLS AFE: 26366F ENGINEER: P. T. HUCKA~EE ALrTH: $260,000 DALLY: $19,941.00 CUMULATIVE: $63,830 '"/. DAI Y'rD: .... 0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: 4.5 OF 6 COMMENT$:' NO ACCIDENTS REPORTED FLUID TYPE: DAYS WITHOUT LT~... ;350 SPILLS: NQ SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,569' TIME ANO SUMMARY OF OPERATIONS: 5.0 HRS- FINISH RE-TESTING BUNDS, FLOOR VALVES AND UPPER/LOWER IBOPS, TEST.:.Tf250 PSI LOW AND 5000 PS1 HIGH, 0.1~ 7.5 I-IRS- MAKE UP BIT, 4 DC'S AND JARS. STAGE IN HOLE T/Sg66'. 1.5 HRS- RO~ATE/CIRC CLEANING OUT THRU PERFS F/X3966' T/TOP OF FISH AT 10559' 1.0 HRS- CIRC BOTTOMS UP. 9.0 HRS- POH W/BIT, MAKE UP 7" CASING SCRAPER ON BIT, STAGING IN HOLE AT REPORT ~ME. 24.0 HR$ TOTAL ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... 'SUMMARY OF DALLY COST' SWEPI SUPERVISION & LABOR: $750.00 . CONTRACT'~=RVICES: MATERIALS: A..CONTRACT CREW + RS&D $9,860.00 A..$WEPI PURCHASED RIG SUPPME$ $0.00 B..CATERING $750.00 B..WORKOVER FLUIDS & ADDITIVES $256.00 C..FISHING $5,400.00 C..PACKERS $0.00 D..CEMENTING $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0~00 E..STIMULAT~ON, OTHER PUMPING $0.00 E..TUBING, PUPS,' COUPLINGS, X-O',' $0:00 F.,PRODUGTION EQUIP SERVICES $0.00 F..GAS UFT MANDRELS & VALVES $0.00 G.~PERFORATING SO.IX) G.J(- & XN NIPPLES $0.00 H.;PACKER., PLUG GETTING $0.00 H..WELLHEAD EQUIPMENT $2,392.00 i..LOGGING, OTHER ELECTRIC UNE $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00 J..SUGKLII~, BRAIDED LINE $0.00 I_.OTHER MATERIALS PLUS FUEL SS00.00 K...WE~ SERVIGE $0.00 TOTAL MATERIALS $3,148.00 L.OTHER SERVICE (TONG OP.) $0.00 TOTAL GONrflAGT SERVIGES $16,010.00 WORK STRING RENTAL $0.00 TOOLS, SLIPS, ELEV RENTAL $0.00 TRANSPOFiTATION: FIXED GOST $0.00 SPECIAL TOOLS ETG RENTAL :$0.00 TRANSPOP TATION: ALL OTHER $0.00 OTHEFI RENTAI~ TEST PLUG $33.00 TOTAL TRA~ISPORTATION GOST $0.00 TOTAL RENTALS $33.00 TOTAl_ P. 01 DAILY REPORT PLATFORM: IA WELh A24-01 17-Mar-94 FOREMAN: R.V. WELLS Al=E: ~ ENGINEER: P. T. HUCKABEE AUTH: $260JXX) ONLY: $12,525.00 CUMULATIVE: $43,889.~ .... DN YTD: ....g TRI YTD: ....I DAY & DAYS ESTIMATED: COMMENTS: NC) ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: DAYS WlTHI~FT LTA.... :349 SPH.LS: NO[SPIU.~: REp(]mRqlED RT TO TBG HANGER: 38.50' TOF: 10,$69' TIME AND SUMIWIN%Y OF OPERATIONS: 2.5 HRS- WAIT ON TOP SUB. 8.0 HRS- ~ UP WASH PIPE/SHOE, 40C'SlJARS, TIH TI4OOS~'. 1~ HRS- WASH CLEN~ OUT F/lOOSr 2-~ HIS- TOOK HEAVY OIL/GAS FLOW AT BOTTOMS UP, PUT WELL ON CHOKE, CIRC CLEAN. 0,5 HRS- WORK OVER FISH Fi10559' T/10579', PULLED UP T/300K, LOST WEIGHT. WOR~ BACK {2OWN TI10579' SEVERL TIMES, NEVER REGAiI~ED A PURCHASE. 7.0 HRS- PUMP DRY JOB, BLOW OOWN TOP DRIVE, POH. NO RECOVERY. LEFT 8' PIECE OF BOTTOM OF SHOE AND 4 OF THE lff COLD ROLL BY 2' LONG WEUDED IN~IDE OF THE SHOE, GRABBEFI$. (6 PIECES OF JUNK LEFT IN HOLE) 1.5 HRS- RIGGING TO RE-TEST BLIND RAMS. SEE, NOTE BELOW. Aoomo~ COMMENTS: mILLS. VISITORS, INSPECTORS ETC... ~ $1NEiml SuimEFhlSHON & LABOR: ' ~.CO~~ ~ + R~ $9.~.~ ~.~~ ~~D RIG S~8 ~ C~~ ~.~ C~A~S ' F.~~ EQ~ ~~ ~.~ F..~ ~ ~~ & V~$ ~ d..SU~ ~ ~ U~ ~ ~~ ~~ PLUS ~ TOT~ ~ ~A~N ~ ~ TOT~ RE~~ $750.00 ,- TOTRI.. P.01 DALLY REPORT PLATFORM: .~ .WELL: A24-01 16-Mar-94 FOREMAN: R.V. WELLS Al=E: 2636671 ENGINI;I~: P. T. HUCKABEE ~ ' '~ . ,: r ' AUTH: S260,~ DALLY: $15,926.00 CUMULATIVE: $31,363 · .'/. DAI YTD: .... D TRI Y'rD: .... 1 DAY & DAYS ESTtMATED; 1.5 OF 6 COMMENT~: NO ACCIDENTS REPORTED FLUID TYPE: FiW WEIGHT: 8.4 DAYS WITHOUT LTA.... 348 SPILLS: NOiSPILLS REPOR'TED RT TO 'I'BG HANGER: 38.50' TOF: 10,569' TIME AND SUMMARY OF OPERATIONS: 1.0 HRS - ~NISHED CIRC OUT OIL.JGAS 12.0 HRS - PO.H LAYING DOWN TUBING, GLM'S AND PACKER. CHECKED FOR N.O.R.M. RONE FOUND. FULL RECOVERY OF PRODUCTION EQUIPMENT. 7.5 HRS - I~C, KED UP 'I'BG HANGER, INSTALLED 2 WAY CHECK VALVE. SET HANGER, RUN lIN:2 LOCK DOWN SCREWS. PRESSURE UP, 2 WAY CHECK LEAKING. PULL TBG HANGER, INSTA~_I ;rD FLOOR VALVE ON BTM OF HANGER. SET HANGER, TEST BUNDS, 2 FLOOR VALVES, UPPER/LOWER IBOPS T/260 .P~! AND 5000 PSI. HAD PROBLEMS REMOVING 2 LOCK DOWN SCREWS. 1.0 HR$ - M.aiKE UP HOMCO JUNK BASKET/WASHPIPE, HAD INCORRECT THREAD ON TOPSUB. 2.5 HRS - WAIT ON CORRECT THREADED TOPSUB FOR WASHPtPE. ADDmONN., COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... *HAD H2S mILL,AT 14,30 HRS. (SUMP PUMP ROOM) ALL RESPONDED WELl_ *; SUMMARY OF DALLY COST' SWEPI SUPER. VISION & LABOR: $750.00 CONTRACT'". SERVICES: IVlATERIALS: A..CONIP, ACT CREW + RS&D $9,860.00 A..SWEPI PURCHASED RIG SUPPUES $0.00 B..CATERI.N~ $750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00 C..FISHING $0.00 C..CLEAN OUT BIT. $4,296.00 D..CEMEINrrlNG $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0.00 E..ST1MULATION, OTHER PUMPING $0.00 E..TUBING, PUPS, COUPt.tNGS, X-O't $268.00 F..PRODUCTION EQUIP SERVICES $0.00 F..GAS UFT MANDRELS & VALVES $0.00 G..PERFORATING $0.00 Q..X- & XN NIPPLES $0.00 H..PACKI~, ':PLU{3 SETTING $0.00 H..WELLHEAD EQUIPMENT $0.00 I..LOGGING, OTHER ELEC'IRIC UNE $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00 J..SUCKL.INE, BRAIDED UNE $0.00 L..OTHER MATERIALS PLUS FUEL $0.00 K..WEU. HEAD SER~CE $0.00 TOTAL MATERIALS $4.,566.00 L..OTHEI; SERVICE (TONe OP.) $0.00 TOTAL COI~t'I'RACT SERVICES $11.360.00 WORK STRING RENTAL $0.00 TOOLS, SUPS, ELEV RENTAL $0.00 TRANSPO=~TATION: FIXED COST SCi.(X) SPECIAL TOQLS ETC RENTAL ' $0.00 TR3~SI:q3 :ITATION: ALL OTHER $0.00 OTHER RENTALS $0.00 TO~AL TR,a NSPQRTATION COST $0.00 TOTAL RENTALS $0.00 TOTRL P.O1 ~' '~'-/ DALLY REPORT ' PLATFORMiA WEL~ A2¢-01 15-M~-9¢ FOREMAN: R.H. SELTZ ~' AFE: 2636~ ENGINEER: P. T. HUCKABEE I .. · AUTH:$2eO,000 DAILY: $11,360.00 CUMULATIVE: $15,437 ............... r' ........................................ maw~laraaa,~s~e~a.e... ~' DAI YTD: .... ! 0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: .5 OF 6 ': COMMENTS: 'NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4 ~ DAYS WlTHtOUT LT~... 347 "' SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,569' *' l']~ .N%JD 8UMM,N:JY OF OF~.RATJON$: *'2~.00 HR$ - ~SH Cl~C. WELL TO ~ om:OK T~dNK - HOLD 8~J:EI'Y MEEllNG FOR N/D, N/U - LET WELL ~STABIUZE - PUMP 114 BBL$ DOWN TBS - INSTALL BPV - PULL TREE & SET RISER *; NOTEi BPV STARTED TO LEAK AFTER RISER WAS SET, STACKED MUD CROSS & BOPS AND SCREWED LANDING JT INTO TBG HANGER - N/U UP BOPS - NOTE; BPV CONTINUED TO LEAK, ILIAD TO CLOSE SAFETY VALVE ON TOP ON LANDING JT. (MAX PRESSURE WAS 140 PS, I)- FINISH NAJ BOPS - PUMP 84 BBLS FiW DOWN TBG - PULL BPV - TEST BOPS i- HYORIL TO 250/3500 PSi, RAMS & ALL OTHER ASSOCIATED EQUIP TO 250/5000 PSI NOTEi DID NOT TEb"T BUND RAMS - BACK OUT TBG HANGER LOCKING SCREWS - PICK *'- UP TO. 200,000 AND UNSET PACKER - MONITOR BACKSIDE - ClRC OUT GAS & OIL NOTE~ BOAT DEUVERED 40,000 GAL DIESEL 3-14-94 ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC... "SUMMARY OF DAILY COST' SWEPI SUPERVISION & LABOR: $750.00 CONTRACTISERVICES: MATERIN. S: A..CONTR CTCREW + RS&O B..CATERING C..FISHIN~ · D..CEMEN~NG E..$TIMUL~TION, OTHER PUMPING r. F..PRODU~'I;ION EQUIP SERVICES G..PERF~NG H..PACKER, PLUG SETTING I..LOGGIN~, :OTHER ELECTRIC UNE '". J..$UCKLII~[, BRAIDED UNE $9,860.00 A..SWEPI PURCHASED RIG SUPPUES $0.00 $750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00 $0,00 C..PACKERS $0.0O $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0.00 $0.00 E..TUSING, PUPS, COUPUNGS, X-O',' $0.00 $0.00 F..GAS MIT MANDRELS & VALVES SO.00 $0.00 G..X- & XN NIPPLES $0.00 $0.00 H..WELLHEAD EQUIPMENT $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00 $0.00 L.OTHER MATERIALS PLUS FUEL $0.00 $0.00 TOTAL MATERIALS SO.iX) $0.00 $11,360.00 WORK STRING RENTAL $0.00 TOOLS, SUPS, ELEV RENTAL SO.00 SO.00 SPECIAL TOOLS ETC RENTAL $0.00 $O.00 OTHER RENTALS $0.00 $0.00 TOTAL RENTALS $0.00 TOTAL P.01 DAILY REPORT PLATFORM: A WELI~ A24-01 14-Mar-94 FOREMAN: R.H. SELTZ AFE; 2636~, ' ENGINEER: P. T. HUCKABEE AUTH: $260 000 DAILY: $~,031.00 CUMULATIVE: $4,077 ..':. / DAI YTD: .... l0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: .5 OF 6 , COMMENT~: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4 DAYS ~ LTA .... 346 SPILLS: Nq SPILLS REPOR~D RT TO TBG HANGER: 38.50' TOF: 10,569' TIME AND ~ UMMARY OF OPERATIONS: 2.00 fIRS - ,¢;KID RIG OVER WELL - RIG UP - R/U SUCKMNE & LUBRICATOR - TEST LUBRICATOR ' TO lS{ i0 'PSI - RIH & PULL SSSV ~ 284' - RIH & PULL ~ GLV @ 9627' - R/D LUBRICATOR & SUC KUNE UNIT - R/U TO PUMP FIW DOWN TBG, TAKING RETURNS UP ANNULUS TO ' PRODI JCTION HEADER - CIRC. FlW TO KlM.WELL RIG A¢:CEPTED ON A24-01 ~ 1800 HRS 3-13-94 · .-0 'b ,,,.,ed ADI~TIONA COMMENTS; DRILLS, ~ISITORS, INSPECTORS ETC... ERVISION & LABOR: SERVICES: ~ CREW + RS&D TING I~TION, OTHER pUMpING ,'TION EQUIP SERVICES ~TING I,. PLUG 8ETrlNG ~,:OTHER ELECTRIC UNE ~E, BRAJDED UNE · ~D SERVlCE ~RVICE (TONG OP.) fTRACT SER~ICES I TRANSMUTATION: FIXED COST TRANSI~ORTATION: AIL OTHER 'SUMMARY $375.00 S2~81.00 $376.00 $0.00 . $3,031.00 OF DAILY COST' MATERIALS: /L.SWEPI PURCHASED RIG SUPPUES B..WORKOVER FLUIDS & ADDITIVES C..PACKERS O..BRIDGE PLUGS, RETAINERS, EZSV E..TUBING, PUPS, COUPMNGS, X-O F..GAS UFT MANDRELS & VALVES G.3(- & XN NIPPLES H..WELLHEAD EQUIPMENT I..BOP, KOOMY, CHOKE PARTS I,.OTHER MATERIALS PLU~ FUEL TOTAL MATERIALS WORK STRING RENTAL TOOLS, SUPS, ELEV RENTAL SPECIAL TOOLS ETC RENTAL OTHER RENTALS TOTAL TI~IA~SPORTATION COST $0.00 TOTAL RENTALS $0.00 ~- TOTAL P. 01 Shell Western E&P Inc. 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 February 15, 1994 Alaska Oil and Gas Conservation Commission .. 3001 Porcupine Drive Anchorage, AK 99501.. SUBJECT: SUBMITTAL OF APPLICATION FOR SUNDRY APPROVALS (FORM 10-403) for MIDDLE GROUND SHOAL A24-01 Enclosed in triplicate is the Application for Sundry Approval for a rig workover to pull the tubing and perforate the "F" pool in the MGS A24-01. Also, if an underreamer fish can be removed from the wellbore, additional "G" pool interval will be perforated. If you have any questions or wish to discuss, please call Paul Huckabee at (907) 263-9646. Sincerely, Paul Huckabee Staff Production Engineer FEB 1 6 1994 0il & Gas Cons. Commission Anchorage STATE OF ALASKA AL~-~'~r(A OIL AND GAS CONSERVATION COMMI~3N APPLICATION FOR SUNDRY APPROVALS Suspend Opera, on shutdown Re-enter suspended well __ 1. Type of Request: Alter cesin~- Repair W-~' Plugging Ti~e extension Stimulate ;i ~i Change appr~-ed program __ Pu-~'tubing X '~ariance Pe-'~orate X Other '-- -- 6. Datum elevation (~-'~-or KB/Z~./ Shell Western E&P Inc. fe~t~ 2. Name of Operator Development X 3. Address 601 West 5th Avenue, Suite 800 Exploratory __ Anchorage, AK 99501 Strafigraphic __ Service 4. Location of well at Platform A, Leg 4, Conductor 28, 1564'N & 378'W of SE Corner of Sec. 11, T8N, R13W, SM sudace At top of productive interval At effective depth At total depth 5. Type et Well: 9966' (M.D.), 5285'N & 2095'E of SE Corner of Sec. 11, T8N, R13W, SM 10,800' (M.D.), 5699'N & 1935'E of SE Corner of Sec. 11, T8N, R13W, SM 10,900' (M.D.), 5743'N & 1910'E of SE Corner of Sec. 11, T8N, R13W, SM 116' DF 7. Unit or Property name Middle Ground Shoal 8. Well number A24-01 9. Permit number 73-38 10. APl number 50-733-20258-00 11. Field/Pool MGS/"G" Pool 12. Present well condition summary Total depth: measured true vertical 10,900 feet 9482 feet Effective depth: measured 10,800 feet true vertical 9396 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Structural Conductor Sudace 2010° 13-3/8", 61 #, K-55 1300 sx Intermediate Production 10,888' 7", 29#, N-80 2100 sx Liner Perforation depth: measured 9966'.10,534' (8 Intervals) true vertical Tubing (size, grade, and measured depth) 3.1/2", 9.3#, N-80 RUE 8RD @ 9888' 10567' CTU Underreamer Measured depth True vertical depth 2010' 1832' 10,888' 9472' RECEIVED FE~ ! 6 1994 ~<~ u. · Gas Cons. C0mmissiol Anchorage Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 284' 13. Attachments Description summary of proposal Detailed operations program BOP sketch 14. Estimated date for commencing operation I15. Status of well classification as: Oil X Gas Suspended Service 16. If proposal was verbally approved Name of approver Date approved 17. I hereby~certify t~foregoing is true and correct to the best of my knowledge Signed d-('?..~ , Title Staff Production Engineer Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrityf .BO_P Test_~_ Location clearance__ Mechanical Integrity/est__ Subsequent form required 10- ~ ~ 7' Approved by order of the Commission Original Signeo B.~ David W, Johnstor, IApproval , APproved Copy Returned Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DESCRIPTION SUMMARY OF PROPOSAL ATTACHMENT MIDDLE GROUND SHOAL WELL NO. A24-01 REPLACE TUBING & PERFORATE "F" POOL STATUS MGS A24-01 is currently producing 136 BFPD at 48% H20 cut (71 BOPD) form the Hemlock ("G" pool). A rig workover is proposed to replace the tubing, clean out the wellbore to PBTD, and perforate the "F" ~__o_~1. E~ty-six feet of pay has also been identified in the lower Hemlo~ "G" pool ~nd~ perforated if clean-out PBTD is below 10557'~-- PROPOSED OPERATIONS SUMMARY 1. SI lift gas injection. Bleed tbg x csg annulus. 2. RU Slickline Unit (SLU) and test lubricator. RIH and pull SSSV from 284'. RIH and pull orifice from bottom gas lift mandrel (GLM) at 9627'. RD SLU. 3. RU FIW from downstream of CUNO filters and circulate down tubing taking returns via the tbg x csg annulus to production to displace the wellbore clean with FIW. Shut in well and monitor pressure build-up to determine appropriate kill fluid density for workover operations. 4. Kill well with required kill brine or CaC03 mud. 5. Install BPV, ND Tree, and NU 5000 psi BOPE and test Per API RP 53 and Shell Safe Practices. 6. Install lift sub and PU to shear release Guiberson UNI-VII packer (set @ 9846' MD) with straight pull shear release. POOH with 3-1/2" 9.3# N-80 EUE 8rd tubing, SSSV, GLM's, packer, and tubing/packer accessories. Inspect tubing for NORM scale contamination. Send tubing to Tuboscope for CLASSIFAX inspection and potential reuse/repair. 7. RIH with washover shoe to recover underreamer fish at 10569'. POOH. 8. RIH with 6" mill and clean out 7" 29# wellbore to PBTD at 10790' (NOTE' Bottom HN-HR perf at 10534'. Proposed HR-HZ perfs from 10557' - 10643'). Pump 5+ bbl XANVIS polymer sweep to clear debris from wellbore. Dispose of contaminated return fluid down A44-11. POOH. 9. RIH w/ 6" mill and casing sCraper to 9600' in preparation of setting a Baker Model "HB" packer at 9550' (+/-). Pump 5+ bbl XANVIS polymer sweep to clear debris from wellbore. Dispose of contaminated return fluid down A44-11. POOH. RECEIVED C' \F I L ES\PROG\A2401 RI G. PRG page 1 FEB 1 6 1994 Alaska Oil & Gas Cons. Commission Anchorage 10. Run the following equipment on 2-7/8", 6.5#, N-80/L-80, EUE 8rd tubing: a) Baker Wireline Re-Entry Guide (WLREG) b) OTIS 2-7/8" "XN" nipple (2.205" ID) c) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing d) Baker "HB" packer for 2-7/8" x 7" 29# to set at - 9550' e) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing f) OTIS 2-7/8" "X" nipple (2.313" ID) g) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing h) Bottom Gas Lift Mandrel (GLM) i) 2-7/8" 6.5# N-80/L-80 EUE 8rd tubing and GLM's per Production Engineering recommendat ion j) 2-7/8" Baker "FV-6" TRSCSSV w/ 2.313" "X" nipple profile in top & 1/4" SS control line set at- 300'. 11. Install tubing hanger & land tubing. RU Slickline Unit (SLU) & test lubricator. RIH and set plug/prong in "XN" nipple below packer. Pressure up per Baker instruction to set packer. Test tubing to 3500 psi. POOH with plug/prong. RD SLU. Secure hanger in spool. 12. ND BOPE/NU Tree and test each tree component to 5000 psi. Skid rig. 13. Return well to production via gas lift. 14. After ~roducti~s stabilized, RU Schlumberger Electric Wireline Unit ~-E-WLU)~ and ~'erfora~-~ the '~ool (GR-GS) from 9663' - 9720' with 2-1/8" Retrievable Strip Phased Enerjet guns loaded 6 SPF. RD EWLU. Test well and report. C: \F I L ES\PROG\A2401R I G. PRG page 2 RECEIVED FEB 1 6 t994 A~ska Oil & Gas Cmn~. G~mmi~m~ 8 9 10 11 12 13 COMPLETION EQUIPMENT DETAIL SHEET MGS A24-01 7/13/87 ~10. ITEM APPROXIMATE TVD. MD. PSI OR , ~ 1. OTIS BALL VALVE 2. CAMCO KBM MANDREL #1 3. CAMCO KBM MANDREL #2 4. CAMCO KBM MANDREL #3 5. CAMCO KBM MANDREL #4 6. CAMCO KBM MANDREL #5 7. CAMCO KBM MANDREL #6 8. CAMCO KBM MANDREL #7 9. CAMCO KBM MANDREL #8 10. CAMCO KBM MANDREL #9 11. GUIBERSON UNI-PACKER VII 12. OTIS "X" NIPPLE 13. GUiBERSON SHEAR SUB 284 284 2139 2364 1000 3/16 3979 4454 990 3/16 5362 6113 980 3/16 6328 7243 970 3/16 7065 8063 1040 1/4 7480 8520 1030 1/4 7802 8887 1020 1/4 8103 9256 1000 1/4 8411 9627 OR 3/8 8590 9846 8616 9877 8625 9888 CASING 13 3/8", 61/I, K-55 @ 2010' w/1300 sx 7" 29//, N-80 @ 10888'w/2100 sx TO = 10,900' TUBING 3 1/2", 9.3#, N-80 EUE 8RD @ 9888 PERFORATED ZONE GROSS INTERVAL HC-HD HC-HD HE-HF H[-HK HK-HN HK-HN HN-HR HN-HR 9966-10026' 10050-10091' 10113-10133' 10187-10215' 10245-10295' 10306-10366' 10390-10475' 10500-10534' FEB 1 6 t994 Oi~ & Gas Cons. Commission Anchora{~e MGS A24-01 PROPOSED WELLBORE DIAGRAM - 2/15/94 XX () !3 XXX <=- / -/ BAKER "FV-6" TRSCSSV w/ "X" Profile @ ~ 300' 24" Conductor Casing @ 370' 13-3/8" 61# K-55 Sur~face Casing @ 2010' 2-7/8" 6.5# N-80/L-80 EUE 8rd tubing GLM MD TVD _-- 1 ' ' 12 2 ' ' 12 ...... 3 ' ' 12 4 ' ' 12 5 ' ' 12 6 ' ' 12 7 ~' ~' _/ "ORIFICE PORT Ptro Psc Pso GAS OTIS "X" Nipple @ ~ 9520' (2.313" ID) I jt 2-7/8" 6.5# N-80 EUE 8rd tbg BAKER "HB" Packer @ - 9550' w/ __# shear 1 jt 2-7/8" 6.5# N-80 EUE 8rd tbg OTIS "XN" Profile Nipple @ ~ 9580' (2.205" ID) BAKER Bell Wireline Re-Entry Guide @ 8481' := GN-GO : = GR-GS MD 9663' - 9720' MD UNDRRMR FISH? IIIIIIIII ~~~,,~~~~~~ TD = 10900' = HC-HD = HD-HE = HE-HF = HI-HK --- HK-HN = HN-HR = HR-HZ 9966' - 10026' 10050' - 10091' 10113' - 10133' 10187' - 10215' 10245' - 10295,, 10306' - 10366' 10390' - 10475', 10500' - 10534' 10557' - 10643' ? UNDERREAMER FISH @ 10569' ? < PBTD : 10790' MD \ 7" 29# N-80 BTC Production Casing @ 10888' MD RECEIVED C' \F I L ES\PROG\A2401RI G. PRG page 3 FEB 1 6 1994 OiL & Gas Cons. Commission Anchorage Shell Western E&P Inc. An affiliate of Shell Oil Company 601 West Fifth Avenue Suite 800,~fj~f Anchorage AK 99501 June 10, 1992 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Gentlemen: SUBJECT: SUBSEQUENT REPORT FOR MIDDLE GROUND SHOAL WELL A24-01 .Enclosed are duplicates of the Subsequent Report for the recently completed jet wash and acid squeeze treatment on Middle Ground Shoal well A24-01. The work was completed on May 22, 1992. If you need additional reports or information, please contact Mr. Paul Huckabee at (907) 263-9646. Very Truly Yours, S. B. Brown-Maunder Sr. Environmental Technician Alaska Operations SBBM/dlw Enclosures SBBM~061092C.WP5 RECEIVED JUN 1 7 1992 Alaska.Oil & Gas Cons. Commiss'to~ N~chorage STATE OF ALASKA Ab OIL AND GAS CONSERVATION COMMI~,~ _./N r~ R I REPORT SUNDRY WELL OP RATIO'N ' A [ 1, Operations performed: Operation shutdown __ Stimulate_..~_.X Plugging__ Perforate __ Pull tubing__ Alter casing__ Repair well __ Other X 5. type of Well: 6. Datum elevation (DF or KB) 2. Name of Operator Shell Western E&P Inc. Developmenl X 106' DF feet 3. Address 601 W. 5th Avenue, Suite 810 Exploratory 7. Unit or Property name Anchorage, AK 99501 Stratigraphic Middle Ground Shoal Service 8. Well Number 4. Location of well at surface Platform A, Leg 4, Conductor 28, 1564'N and 378'W of SE A24-01 Corner of Sec. 11, TSN, R13W, SM 9. Permit number/approval number At top of productive interval 9966'(M.D.), 5285'N and 2095'E of the SE Corner of Sec. 11, 73-38/92-124 TSN, R13W, SM ':1'0. APl number At effective depth 10,800' (M.D.), 5699'N and 1935'E of SE Corner of Sec. 11, 50-733-20258-00 T8N, R13W, SM 10,900' (M.D.), 5743'N and 1910'E of the SE Corner of Sec. {1. Field/Pool At total depth 11, T8N, R13W, SM MGS/"G" Pool 12. Present well condition summary Total depth: measured 10,900 feet Plugs (measured) true vertical 9482 feet Effective depth: measured 10,800 feet Junk (measured) 10,567' CTU underreamer true vertical 9396 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor Surface 2010' 13-3/8", 61#, K-55 1300 sx 2010' 1832' Intermediate Production 10,888' 7", 29#, N-80 2100 sx 10,888' 9472' Liner Perforation depth: measured 9966'-10,534' (8 Intervals) true vertical Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 ~EUE 8RD @ 9888' RECEIVE Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 284' 17 1992 13. Stimulation or cement squeeze summary Alaska 0il & 6as Cons, 60[ Intervals treated (measured) 9400'-10,534' Anchorage. Treatment description including volumes used and final pressure 23.8 bbls 25:75 xylene:7.5% HCl soak followed by 52.8 bbls 5% HCl jet wash and 18 bbls 5% + 83 bbls 7.5% HCl squeeze 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 28 36 28 500 80 Subsequent to operation 146 J 184 186 600 110 15. Attachments: MIT test form 16. Status of well classification as: Copies of Logs and Surveys run ~ Oil X Gas Suspended__ Service Daily Report of Well Operations -- -- 17. I hereby certify that the foregoing ~s true and correct to the best of my Knowledge ~,~r,~ .IA Af~A r3,-,~,, /'~,'/4 ~/OO C~l I~AIT I1~1 r~l IDI It"AT[::: WELL: A24-01 D~ILY REPORT RECEIVED J U N 1 1 1992 Alaska Oil & Gas Cons. CommisSioa Anchorag DAILY SUMMARY - 5/16/92 - CONDUCT PRE-JOB SAFETY MEETING WITH ALL PLATFORM OPERATING PERSONNEL. - CONTINUE TO RIG UP EQUIPMENT AND PROCESS LINES. - RECEIVE 15,000 GALS OF DIESEL FROM MV LAFAYETTE @ 1230 HRS. - ASSIGN COSTS FROM MOBILIZATION TO WELL A24-01 @ 1200 HRS 5/15/92. - PRESSURE TEST CTU ROPE @ 250/5000#. REPAIR PUMP VALVES AND VARIOUS LEAKS. PRESSURE TEST FLOW AND PROCESS FLUID LINES TO SURGE TANKS @ 20/200#. REPAIR VARIOUS LEAKS. - BLEND 200 BBLS OF 5% HCl WITH FW. - COMPLETE REPAIRS OF PRESSURE LEAKS. R/U 2.7" "WAVEY" MILL, 2.375" HORZ. PDM, HYD. DISCONNECT, DBLCV. TO 1.5" CTBG. TEST RUN MILL @ SURFACE. - RIH WITH MILL ASMY. @ 2000 HRS 5/15/92 WHILE PUMPING FIW @ 0.5 BPM. OBSERVE 20% OVERPULL IN SECTION F/9,000' T/EOT. INCREASE TO 52 GPM AND TAG TIGHT SPOT @ 9865'. WORK THROUGH TIGHT SPOT. RUN MILL ASMY TO 9900' TD. - P/U TO 9750' & RIH T/9865'. NO TIGHT SPOT OBSERVED. - PUMP 5 BBL GEL SWEEP. POH CHASING SWEEP. - P/U 2.7" "WAVEY" MILL, 2.5" X 6.059" CDH UNDERREAMER. 2.375" PDM. DBLCV. FUNCTION TEST BHA, PRESSURE TEST LUBRICATOR. - RIH W/UNRMR ASMY. T/5500' @ REPORT TIME. 5/17/92 - RIH WITH BHA #1 (SEE BELOW) TO 9411' WHILE PUMPING @ 0.25 GPM. (THE LOW FLOW RATE DISABLED THE UNDERREAMER EXTENSION CAPABILITY) - WORK BHA THROUGH TIGHT SPOTS IN TUBING @ 9411', 9433', 9600', 9789'. SUSPECT CAUSE IS THE LOCKED UP CONFIGURATION OF THE BHA COMBINED WITH SCALE IN TUBING. WORK THROUGH TIGHT SPOTS @ 8-10 FPM. - EXTEND UNDERREAMER BELOW EOT AND REAM 7" LINER @ 2-2.6 FPM. ENCOUNTER RESISTANCE (SCALE) ALMOST CONTINUOUSLY TO 10,570' (36' BELOW PERFORATIONS). PUMP 2EA 5 BBLS SWEEPS WHILE REAMING TO BOTTOM. - ENCOUNTER PROBLEM WITH SURGE TANK VENT (FLARE) LINE. R/U TEMPORARY VENT LINE. INSTALLING SECOND FLAME ARRESTOR AT BASE OF FLARE BOOM. - UNABLE TO REAM BEYOND 10,570' DUE TO ZERO P-RATE. BACK REAM TO 10,200'. REAM DOWN TO 10,570'. - SLOWLY HOIST TOOL @ 9 FPM WHILE PUMPING 18 BBL SWEEP TO DISPLACE SOLIDS FROM WELLBORE. - POH WITH BHA #1. - BREAK LUBRICATOR. OBSERVE LOSS OF BHA @ HYDRAULIC DISCONNECT. FISH LOST IN HOLE INCLUDES PD MOTOR & UNDERREAMER (SEE FISH BELOW). APPARENT CAUSE OF LOSS DUE TO PREMATURE FAILURE OF HYDRAULIC DISCONNECT. SBBM/A24-01.WP5 D/%I LY REPORT 5/17/92 - REVIEW PROJECT OPTIONS· (CONT) - R/D FROM A24-01, LEG #4. - MOBILIZE WIRELINE FISHERMAN & RECOVERY TOOLS. - BEGIN MOVE TO A13-01L, LEG #1 @ 0100 HRS 5/17/92. - SUSPEND OPERATIONS FOR 6 HRS. FOR PERSONNEL TO CATCH UP ON SLEEP. - MOVE TO LEG #1, BEGIN R/U ON A13-01L. FLOODING ANNULAR SECTION WHILE R/U. BHA DATA: #1' · FISH: 2.7 WAVE MILL, 2.5X6. 059" UNDERRMR, 2. 375" PDM, HYD DC, DBLCV. 2.7" WAVE MILL, 2.5X6.059" UDRMR, 2.375" PDM, HYD DC = 18.5' OAL 5/18/92 - WL FISHERMAN W/FISHING TOOLS ARRIVED BY BOAT @ 1700 HRS. R/U & RIH WITH 2.7" OVERSHOT GRAPPLE, HYD & MECHANICAL JARS. TOOL SAT DOWN @ #1 GLM. ATTEMPT TO GET PAST #1 GLM (LOW SIDE POCKET). - WORK PAST #1 TO #3 GLM. TOOL STUCK ON #3 GLV @ 6113'. JAR FREE, RELEASE & LEAVE IN HOLE C TBG OVERSHOT ASMY. POH, REBUILD HYDRAULIC JARS, PREP WL FISH RETRIEVAL· RIH & LATCH ON WL FISH. RETRIEVE C TBG OVERSHOT ASMY WITHOUT (INTERNAL) GRAPPLES. SECURE WELL, S/D FOR NIGHT. 5/19/92 - RIH W/IMPRESSION BLOCK. RETRIEVE & OBSERVE GRAPPLE PIECES IMPRINT. - RIH W/WIRE SCRATCHER (LOOPED) AND KNOCK GRAPPLE PIECES TO BOTTOM. OBSERVE SLIGHT SLACK-OFF @ 10107'. TAGGED BOTTOM @ 10567'. NO CLEAR INDICATION OF TOF. POH. - RIH W/IMPRESSION BLOCK. NO EVIDENCE OF TOF. - RIH W/FISHING STINGER, NO EVIDENCE OF FISH. POSSIBLE LAYER OF FILL ON TAG @ 10567' TOP OF FISH. POH. R/D WL @ 1500 HRS, 5/18/92. - REVIEWING OPTION OF WASHING OVER FISH WITH COIL TBG (WHEN COMPLETING CTU WELL PROGRAMAND FOLLOWING DEMOBILIZATION). THEN ENGAGE THE SWEPI WL OPERATOR TO ATTEMPT A WIRELINE FISH RETRIEVAL. EST. COST OF FISH IN HOLE IS $25,000. 5/21/92 - RELOCATE EQUIPMENT TO EAST SIDE OF PIPE RACK. R/U CT LUBRICATOR ON WELL. - NEUTRALIZE & PUMP TO PRODUCTION, 200 BBLS OF WORKOVER FLUIDS. ONSHORE OPERATOR NOTIFIED OF EST. ARRIVAL TIME. - S/D @ 2300 HRS 5/20/92 FOR NIGHT. RECEIVED SBBM/A24-01.WP5 JUN ? 992 Alaska .Oil & .Gas Cons. Gomm..'ms[0~ r~Nlcl~orage RECEIVED DAILY REPORT JUN 1 ? 1992 Alaska Oil & Gas Cons. Anchorage 5/22/92 - CONTINUE RIG UP @ 0600 HRS. CONDUCT PRE-JOB SAFETY MEETING. - PRESSURE TEST LP LINES @ 200#, HP LINES & BOPE @ 5,000#. - RIH W/NOZZLE BHA #1 WHILE JET WASHING @ 1.0 BPM W/FIW FROM SURFACE T/10,569' (TO REMOVE LOOSE SCALE) TAG TOF @ THIS DEPTH. - PUMP 5 BBL GEL/POLYMER SWEEP TO CLEAR SS. - PUMP 23.8 BBLS 25:75 PAD ACID (25% XYLENE, 75% OF 7.5% HCl). CHASE W/21 BBLS FIW TO DISPLACE IN LOWER PERFORATED INTERVAL. SOAK F/10 MINS PUMP 23.8 BBLS FIW TO FURTHER DISPLACE PAD ACID TO SECOND STAGE INTERVAL. SOAK FOR 10 MINS. PUMP 23.8 BBLS FIW TO FURTHER DISPLACE PAD ACID UP NEXT INTERVAL. SOAK FOR 10 MINS. PUMP 21 BBLS 5% HCl TO FURTHER DISPLACE PAD ACID AND TO FILL CTBG (IN PREPARATION) FOR JET ACID WASH. - COMPLETE XYLENE 25:75 HCl PAD ACID SOAK. DISPLACE RETURNS TO SURGE TNK. NOTE: RETURNS CAME BACK WITH A Ph OF 6-7, MOSTLY XYLENE, HCl SPENT. - LOCATE NOZZLE @ 10534'. JET ACID WASH PERFORATED INTERVALS PER BELOW: 10534'-9966' (568') @ 20 FPM HOIST SPEED (28.4 BBLS 5% HCl) 9888'-9400' (488') @ 20 FPM HOIST SPEED (24.4 BBLS 5% HCl) - RIH W/NOZZLE (BHA #1) @ 10567'. PUMP GEL/POLYMER SWEEP. DISPLACE RETURNS TO SURGE TANK W/122 BBLS FIW. RETURNS CAME BACK Ph 7. - CONDUCT MIT OF TBG/CSG & INJECTIVITY TEST. (CSG FLOODED W/FIW): COMMUNICATION BETWEEN TBG & CSG IS EVIDENT. DIRECT RESPONSE WAS OBSERVED INJECTIVITY DATA = 2,450# @ 41 GPM, CSG @ 2,550#, CTBG @ 4,450#. - INITIATE ACID SQUEEZE W/NOZZLE @ 10,534'. BEGIN SQUEEZE. LEADING WITH 18 BBLS OF 5% HCl (USE REMAINING MATERIAL TO EMPTY TANK). FOLLOW WITH 83 BBLS OF 7.5% HCl. PUMP 125 BBLS OF FIW TO OVERDISPLACE ACID TO FORMATION BY 85 + BBLS. SQUEEZE DATA AS FOLLOWS: - TIME PTBG# CSG# GPM BBLS CT# 0027 1250 1500 47 5 4950 2400 2500 46 20 4950 0118 2200 2300 47 4950 0300 2250 2350 46 211 4950 0318 2250 2350 46 226 4950 0335 2100 2250 0353 2100 2200 COMMENT INITIAL S/D- ISIP 15 MIN 30 MIN - FSIP SQUEEZE & DISPLACEMENT RATE LIMITED BY MAX. OP. PRESSURE OF CT @ 5000# - BLEED OFF PRESSURE, OPEN WELL TO PRODUCTION HEADER. - PUMP 5 BBL GEL/POLYMER SWEEP, FOLLOWED BY 130 BBLS OF FIW TO DISPLACE RESIDUAL WORKOVER FLUIDS TO SURFACE. CAPTURE LOW Ph FLUIDS AND SWEEP TO SURGE TANK FOR NEUTRALIZATION. SBBM/A24-01.WP5 D~ILY REPORT 5/22/92 - CAPTURE & NEUTRALIZE 150 BBLS OF WORKOVER FLUID. SHIP TO (CONT) PRODUCTION HEADER, NOTIFY ONSHORE OF ARRIVAL TIME. - POH W/NOZZLE ASSEMBLY. SECURE WELLHEAD. RIG DOWN. - OPERATION ASSIGNED TO DEMOBILIZATION AFE @ 0900 HOURS. BHA DATA: FISH: WL FISH: 2.0" SWIRL NOZZLE, EXTN, DBLCV, HYDDC, CTXO 2.7" CDH MILL, 2.5x6.059" (RETRACTABLE) UNDRMR, PDM DRV XO = 4.0' 2.7" OVERSHOT W/GRAPPLE, 1.75" 22 ROPE SOCKET. SBBM/A24-01.WP5 May 5, 1992 Shell Western E&P Inc. An affiliate of Shell Oil Company 601 West Fifth Avenue Suite 800 Anchorage AK 99501 State of Alaska Alaska Oil & Gas Conservation Commission ATTN: Lonnie Smith 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Dear Mr. Smith: SUBJECT: SUBMISSION OF APPLICATION FOR SUNDRY APPROVAL FOR MIDDLE GROUND SHOAL WELL NO. A24-01 Enclosed in triplicate is the application for Sundry Approval to perform a coiled tubing unit acid stimulation operation on MGS Well A24-01. The Workover is anticipated to begin on May 14, 1992 If you have any questions, ' 263-9646. please call Mr. Paul Huckabee at (907) Very Truly Yours, S. B. Brown-Maunder Sr. Environmental Technician Alaska Operations SBBM/PTH/dlw Enclosures SBBM\050592A.WP5 RECEIVED u AY - ? 1992 Alaska Oil & Gas Cons. Commissio~ Anchorage STATE OF ALASKA AL~ OIL AND GAS CONSERVATION COMMI'~'~N APPLICATION FOR SUNDRY APPROVA@5q 1 IN [. 1. Type of Request: 'Abandon__ Suspend__ Operation shutdown __ Re-enter suspended well Alter casing __ Repair Well Plugging__ Time extension Stimulate X Change approved program __ Pull tubing __ Variance __ Perforate __ Other i5. ]-ype ot Well: 6. Datum elevation (DF or KB) 2. Name of Operator Shell Western E&P Inc. Development X 116' DF feet ,,, 3. Address 601 West 5th Avenue, Suite 800 Exploratory 7. Unit or Property 'name Anchorage, AK 99501 Stratigraphic N Middle Ground Shoal Service 8. Well number 4. Location of well at Platform A, Leg 4, Conductor 28, 1564'N & 378'W of SE C°rner of A24-01 surface Sec. 11, T8N, R13W, SM 9. permit number At top of productive 9966' (M.D.), 5285'N & 2095'E of SE Corner of Sec. 11, TSN, R13W, 73-38 interval SM 10. APl number 10,800' (M.D.), 5699'N & 1935'E of SE Corner of Sec. 11, T8N, 50-733-20258-00 At effective depth R13W, SM 10,900' (M.D.), 5743'N & 1910'E of SE Corner of Sec. 11, T8N, 11. Field/Pool At total depth R13W, SM MGS/"G" Pool 12. Present well condition summary Total depth: measured 10,900 feet Plugs (measured) true vertical 9482 feet Effective depth: measured 10,800 feet Junk (measured) true vertical 9396 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor Sudace 2010' 13-3/8", 61#, K-55 1300 sx 2010' 1832' Intermediate Production 10,888' 7", 29#, N-80 2100 sx 10,888' 9472' Perforation depth: measured 9966'-10,534' (8 Intervals) true verticalRECEIVI D Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 EUE 8RD @ 9888' MAY - 7 1992 Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 28~[laska 0il & Gas Cons, Coml~ Anchorage , 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch 15. Status of well classification as: 14. Estimated date for commencing operation 05/14/92 Oil X Gas Suspended 16. If proposal was verbally approved -- -- Service Name of approver Date approved 17. I hereby certify th ~t the foregoing is true and correct to the best of my knowledge /~'~...~Z ~ __~r-.0,.....~ Title Staff Production Engineer Date ~'~/ Signed '' t . FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness IApproval No~.~ Plug integrity__ BOP Test__ Location clearancej~ Mechanical Integrity Test__ Subsequent form require--d 10- ~o ~ .... 'v'~}c~ . 5'-/?- Approved by order of the Corn Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE APPLICATION FOR SUNDRY APPROVALS FORM 10-403 ATTACHMENT DESCRIPTION SUMMARY OF PROPOSAL MIDDLE GROUND SHOAL WELL NO. A24-01 MGS A24-01 declined'at an annual exponential decline rate of 28% from 1984 to 1990. Water cut during this time increased from 30% to 45%. Experience with other MGS producers indicates potential scaling tendencies in this water cut range. Recent CTU acid treatments on Platforms "A" and "C" have been extremely successful under similar producing conditions. The latest test was April 27, 1992 at 56 BPD Gross, 50% H20 cut, and 28 BOPD clean. Continued production of this well without remedial stimulation work will result in uneconomic production within 3 years and will recover only 35,000 bbls additional oil. A coiled tubing unit clean out and acid stimulation is proposed. A 50 BOPD production increase from successful stimulation of this well will increase the recoverable oil by 145,000 bbls. Proposed Operations Summary 1. Fill wellbore via the annulus with Filtered Inlet Water (FIW). 2. Rig up Coiled Tubing Unit (CTU), acid treatment materials & equipment, and return fluid processing materials & equipment. 3. Clean out wellbore to PBTD with downhole motor and bit/mill assembly. 4. Acid treat via CTU with 5 to 7-1/2% hydrochloric (HC1) acid. 5. Neutralize all return fluids prior to sending to production facilities. 6. Return well to production via gas lift. RE6EIVfD Alaska Oil & Gas Cons. Comm'tss%O~ Anchorage Shell Western E&P Inc. 601 West Fifth Avenue * Suite 800 Anchorage, Alaska 99501 dune 11, 1990 Alaska Oil and Gas Conservation Commission ATTN: Elaine Johnson 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI OPERATED MIDDLE GROUND SHOAL FIELD Dear Ms. Johnson: In a recent telephone conversation you discussed with Ms. Susan Brown-Maunder information that would be helpful to you if we could provide it. Enclosed, for your convenience and use, are the following: 2 location surveys showing the location of platform A 1 list of conductor/well locations (in relation to the SE corner of Sec. 11, T8N, R13W) for Platform A wells 1 location survey showing the location of Platform C 1 list of conductor/well locations (in relation to the SE corner of Sec. 23, T8N, R13W) for Platform C wells In addition you requested a revised copy of the Well Completion or Recompletion Report and Log (10-407) for the recently completed well C21-23. The well location at the top of the producing interval and the well location at total depth as been changed to reflect the actual surveyed location. If you have any further questions regarding these matters, please continue to contact Susan Brown-Maunder at (907) 263-9613. Very Truly/Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosures cc: Susan Elsenbast-AOGCC \LETTERS\AOGCC\06! ]90. DOC RECEIVED JUN ! 3 ]9 0 Oil,& ~;as Cons. Comml~olt Anchora~ , HIDDLE GROUND SHOAL Platform "A" WELL/CONDUCTOR LOCATIONS Leg I - Center of Leg i @ 1627'N & 435'W from SE corner of Sec.11, T8N, R13W, S.M. ~ A 12-01 I 1632'N & 437'W from SE corner A 11-01 2 1632'N & 432'W " " " A 43-11 3 1630'N & 430'W " " " A 34-11 4 16 25 ' N & 430' W " " " A 34-14 RD 5 1622'N & 433'W '" " " A 22-14 6 1622'N & 437'W " " " A 12A-01 7 1625'N & 440'W " " " A 13-01 ~ 8 1630'N & 440'W " " " Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec. 11, T8N, R13W, S.M. A 42-11 9 A 44-02 10 A 42-14 11 A 41A- 11 12 A 11-12 13 A 11-13 RD 14 A 31-14 15 A 44-11 16 1685'N & 374'W from SE corner 1685'N & 370 1683'N & 368 1678'N & 368 1675'N & 371 1675'N & 375 1678'N & 378 1683'N & 378 W II II II II II II II II II II II II II II II II II II II II II Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec.11, T8N, R13W, S.M. Leg 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N, R13W, S.M. A 33-11 25 1571'N & 385'W from SE corner A 14-01 26 1571'N & 381'W " " " A 12-12 27 1568'N & 378'W " " " A 24-01 28 1564'N & 378'W " " " A 13-12 29 1561'N & 381'W " " " A 33-14 30 1561'N & 385'W " " " A 41-11 31 1559'N & 388'W " A 23-01 32 1569'N & 388'W " JUJ, t 1 3 1990 !\l~ska Oil & Gas Cons. commission1 Anchora~ SBBC/mgs A I T9N S.M. I ~ J e ~ ADL 18754 : ZON~ 4 Zl 22 Z3 .' . 24 I~ , ~3 34 3~ 36 31 32 : . ,;. LOCATION OF ~ ~ "JUNI3 1910 s~ CONTAIN[O DRILLINO a ~1~o,.~ii & Gas Con~. [ ~mmission PRO O U C I N 0 P L,',T F O'n M : T B N S.t~. , gnchora~ SHELL MIDDLE GROUND SHOAL ~ T 7N S.M., ~ ~ PLATFORM "~" COOt( INLET, ALA*,,A., APPLICATION BY SHELL OIL'CO. LOS ,ANGELES, CALIFORNIA Ii T. 8 N., R.13 W., S.M. : 32 21 I ' ~l ~2 I I I I I I I 118754 {~ ...... ADL b ............. I I i I LEG NO. I0 II , ,, ! ~15 i~ , i~ 13 LEG NO. I LEG NO. 2 LEG NO. 3 LEG NO. 4 P/.ANE COOND//tA T£S X = 232:783 X: 23,2:846 X: 232~896 X: 2,32,833 Y = 2,485~845 Y =27t85,897 Y:2~485,835 Y :2,485:783 1627: l'~ l~ 435'W FROM THE SE COR. OF SEC. II, TBN, RI3W, SM. PUBLIC I. AND 1681' N B. 372' W FROM THE SE COR. OF SEC. IIt TBN, RI3W, SM. D£$CR'/P 1620'N'81 321' W FROM THE SE COR. OF SEC. II, T8N~ RI3W~ SM. 1566'N B :383'W FROM THE SE COR. OF SEC. II, T8N:Ri3W, S.M. LAT.- 60047'44.839" LONG.- 151° 29' 45. II 2". E£ODET/C CO0/:FDIN,4 TEE LAT.- 60°47'45.:368'' LAT.- 60047'44.768" LONG.-151o 29' 4:3.942" LONG.-151°29' 42.~899" LAT.- 60°q7'44.244'' LOI',IG.- 151° 29' 44.154" , 1.I Ii : ,: [?P. AVFH !,'! lt.A. 13. ~ scALE I:' I000' t, u' t'-'~. T~ '~ ~'""'--"- ' '- ~ ~:,~:c::-~ ~' ~.,,.,-: ~i SHELL 01:-~. ,.,~,,;':rv'"~'"'-'~'A:q T , -,  .. · . ':~.,~? -~,-~-~,-~.~'~ ....... ~~. · LOCATION,. OF .... STATE OF ALASKA ALASN,,~' OIL AND GAS CONSERVATION COM~SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Alter Casing [] Other [] StimulateX[] Plugging [] Perforate [] Pull tubing [] % 2. Name of Operator 5. Datum elevation (DF or KB) Shell Western E&P Inc. ~ 116' DF 3. Address 6. Unit or Property name 601 West 5th Avenue, Suite 810, Anchorage, AK 99501 Middle Ground Shoal 4. Location of well at surface Platform A, Leg 4, Conductor 28. @ 1564'N & 378'W from SE corner of Sec. 11, T8N, At top of productive interval R13W, S.M. At effective depth At total depth 7. Well number A 24-01 8. Approval number 7-143 9. APl number 50-- 733-20258-01 10. Pool "G" Pool Feets 11. Present well condition summary Total depth: measured true vertical 10,900 ' feet Plugs (measured) feet Effective depth: measured true vertical feet Junk (measured) 10,613' feet Casing Length Structural Size Cemented Measured depth True Vertical depth Conductor Surface Intermediate Production 2,010' Liner 10,888' 13-3/8", 61#, K-55 7" 29# N-80 2100 sx 2010' 10888' Perforation depth: measured 9766-10534' 9 intervals true vertical 9090-9445' Tubing (size, grade and measured depth) 3-1/2", 9.3#, N-80 EUE 8rd @ 9888' Packers and SSSV (type and measured depth) Unipacker V!! @ 9846' leaned out w/1 gal 12. Stimulation or cement squeeze summary 10,609. Intervals treated(measured) @ 10,300' pumped 25 BBL 1% NH4Cl 20 BBL 1% NH~tC1 Treatment description including volumes used and-final pressure Perforated @ 9,979' 9.999' 1;0 10:025'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure At~,ska 0ii & Gas Cons. Commissi.'m FR26L/10 BBL water ~ 10,268- followed by 153 BBL EDTA & , 9,983', and Tubing Pressure Prior to well operation Subsequent to operation 101 47 5O0 80 109 79 490 80 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev."12-1-85 JHF/0428 Title Production Superintendent Date 5/8/87 Submit in Duplicate DAILY JOB SUMMARY DATE: 4/15/87 WELL NO.: A24-01 OPERATION: CLEAN OUT, EDTA ACIDIZE, AND PERFORATE HR-HZ NOTE: DRIFTED WITH 2.5" DRIFT TO 10250' ON 4/15/87. 07:00 RU ARCTIC COILED TUBING AND HALLIBURTON. 08:20 HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL. 12:50 DISPLACED DIESEL DOWN FLOWLINE FROM ARCTIC AND HALLIBURTON. 13:40 PRESSURE TESTED TO WELLHEAD TO 5000 PSI. RIH CTU. 13:50 BEGAN HEATING MIX WATER FOR EDTA WITH STEAM COLL. TEMP 55F 16:45 TAGGED FILL AT 10268'(KB). CIRC. WITH 1 GAL HOWCO FR26L PER 10 BBL FILTERED INJECTION WATER. 1BPM@ 500 PSI. CIRCULATE OUT FILL TO FLOWLINE. 17:45 UNABLE TO CLEAN OUT BELOW 10609'. TEMP OF MIX WATER 80F. INCREASED PUMP RATE TO 2 BPM @2800 PSI. NO GO. 20:00 WELL STOPPED LIFTING. ATTEMPTED TO BUMP WELL. CIRCULATED FILTERED INJECTION WATER TO DISPLACE HOWCO GEL. WOULD NOT LIFT. LOAD IS 320 BBL WATER. 23:50 DISPLACED TUBING WITH 70 BBL DIESEL. Alas',(a OJ~ & Gr~.s eons, Co,. .... ~ DAILY JOB SUMNARY DATE: 4/16/87 WELL NO.' A24-01 OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ 01:00 WELL BEGAN LIFTING WHEN DIESEL DISPLACED WITHIN TUBING. WITH END OF CT ACROSS FROM PERFORATIONS,WELL WOULD NOT LIFT. DIESEL APPEARED TO BE IN3ECTED. 01:45 COMPLETED PUMPING DIESEL. 02:05 BEGAN MIXING 120 BBL EDTA AT 32#/BBL. 03:32 TITRATED FIRST SAMPLE EDTA. APPROX. 24#/BBL. ADD ADDITIONAL EDTA. 04'45 RE-TITRATED EDTA AT APPROX. 30#/BBL. 05:00 WITH END OF CT AT 10300' MIXED AND PUMPED 25 BBL NH4CL IN FRESH WATER. FOLLOWED BY 153 BBL EDTA AND 20 BBL 1% NH4CL. 08:45 CASING ANNULUS PRESSURE GRADUALLY INCREASED TO 2200 PSI. BASED ON THE IDEAL GAS LAW WHERE (PVl)=(PV2). THIS IS AN INDICATION THAT ALL OF THE TREATMENT WAS CIRCULATED INTO THE CASING AND WAS NOT INJECTED INTO THE FORMATION. MAXIMUM INJ. PRESSURE ON TUBING WAS 1200 PSI. 10:00 COMPLETED DISPLACEMENT. WELL WOULD NOT LIFT. 12:15 DISPLACED TUBING WITH DIESEL. WELL BEGAN LIFTING. 14:20 POH CT. TOTAL LOAD IS 518 BBL WATER (INCL. SPENT EDTA) AND 140 BBL DIESEL. 16:15 RD CTU AND HOWCO. DALLY JOB SUMMARY DATE: 4/29/87 WELL NO.' A24-01 OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ 07:00 RU DRESSER ATLAS. RIH WITH 24' GUN AND ATTEMPT TO PERFORATE THE HR-HZ ZONE. TAGGED FILL AT 10,498' POOH WITHOUT SHOOTING. 13:00 RIH AND SHOOT TWO TEST SHOTS AT 9,979' AND 9983'. PLACE WELL ON TEST. NO CHANGE AFTER 12 HOURS IN RATE OR CUT. POH. DAILY JOB SUMMARY DATE: 4/30/87 WELL' A24-01 OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ 07'00 RIH WITN 26' 2 1/8" SILVER JET GUN LOADED 4 JSPF. PERFORATE 9999 TO 10025' (HC-HD(I)). NO INCREASE IN PRODUCTION NOTED. March 6, 1987 Shell Western E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99.501 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 SUBJECT: SUBMITTAL OF APPLICATIONS FOR SUNDRY APPROVAL FOR MIDDLE GROUND SHOAL WELL NUMBER'S A 24-01 AND A 33-14 Gentlemen: Enclosed are two Applications for S~ on Middle Ground Shoal well numbersi for upcoming workovers and A 33-14. The stimulation and reperforation on A 24-01 is scheduled to begin on March 12, 1987. The coil tubing unit acid treatment on A 33-14 is scheduled to begin March 13, 1987. Each Application is submitted in triplicate. For further information contact Susan Brown at (907) 263-9613. V.e~y tr ly yours, Manag~ Regulatory Affairs SBB/kka Enclosures Oil & Gas Co~$. Anchorage SBBE/aogcc.3 STATE OF ALASKA ALAS"~,~OIL AND GAS CONSERVATION coIVrt~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [~ Pull tubing [] Amend order [] Perforate X3 Other [] 2. Name of Operator Shell Western E&P Inc. 3. Address 601 West Fifth Ave., Suite 810, Anchorage, AK 99501 4. Location of well at surface Platform "A", Leg 4, Conductor 28 @ 1564'N & 378'W from SE corner of section 11, T8N, R13W, At top of productive interval S o M. At effective depth At total depth 5. Datum elevation (DF or .KB) 116' i.. RKB feet 6. Unit or Prop. erty name Mididle Ground Shoal 7. Well n~[n~_O1 8. Permit number 73-38 9. APl number 50-- 733-20258-00 10. Pool "G" Pool 11. Present well condition summary Total depth: measured true vertical 10,900' feet Plugs (measured) feet Effective depth: measured 10,613' feet Junk (measured) true vertical feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 2010' 13-3/8" 61# K-55 2010' 10,888', 7", 29#, N-80, 2100sx @ 10,888' measured true vertical 9,766'-10,534' 9 intervals Measured depth Tubing (size, grade and measured depth) 3-1/2", 9.3#, N-80 EUE 8rd @ 9,888' Packers and SSSV (type and measured depth) Unipacker VII @ 9846' True Vertical depth RECEIVED MAR .... 9 1987 Alaska 0ii & Gas Cons. Commission Anchorage 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation March 12, 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foreg.oing is true and correct to the best of my knowledge Signed ~~/~~ ~- ~ ..~~' ~_~-.-_~ Title Prod~lct, i Olq Su peri ntendent Date Commission Use Only Conditions of approval ', Approved by ~, [.~j~¢~ ~_ .~JJ'JJ' ,¢ Form 10-403 Rev 12-1-85 --~""'~ FORMS/ROSWO. 1 Notify commission so representative may witness I Approval No. ~ ~.~.! [] Plug integrity [] BOP Test [] Location clearanceI ~ommissioner the commission Date Submit in triplicate PROGNOSIS A24-01 OPERATION: 1.CIRCULATE OUT FILL WITH COILED TUBING UNIT. 2.STIMULATE HK-HN WITH EDTA. 3.RIO DOWN AND TEST WELL UNTIL STABLE. 4.PERFORATE HR-HZ THROUGH TUBING. TUBULARS' 3 1/2",9.3#, TO 9888' I 7" 29~, TO !0888' PERFORATIONS' ON WELL DIAGRAM REFERENCE LOG' SOS COMPLETION LOG 5/25/85 STATUS: 100 BO - 56 BWPD INJ 979 MCFPD 2.-'14/87 ~!~ ~ ~!~a EDTA IS A VERY OOOD CHELATING AOENT. WHICH MEANS THAT ANY ION (CALCIUM,IRON OXIDE,ETC.) IT COMES INTO CONTACT WiLL BE ABSORBED DEPLETING THE EDTA SOLUTION. IT IS CRiTiCAL TO GET FULL STRENGTH, UNCONTAMINATED EDTA TO THE FORMATION FOR THIS STIMULATION TO BE SUCCESSFUL. ALL TANKS, MI×IXG VESSELS AND LINES BE CLEAN PRIOR TO MIXING OF ANY CHEMICAL. FRESH WATER WILL BE USED FOR ALL MIXING. DO NOT USE FILTERED INJECTION WATER DURING EDTA STIMULATION. PROCEDURE ].RU COILED TUBING UNIT AND PUMPING EQUIPMENT. PRESSURE TEST ALL SURFACE LINES TO SWAB VALVE TO 4200 PSI WITH ]" HIGH PRESSURE LINE FROM OFFSETTING INJECTION WELL. RIH WITH HIGH PRESSURE WASH NOZZZLE SECURED TO ] 1/4" COILED TUBING WITH ALLEN SCREWS OR SWEDOELOCK CONNECTION. ~AXIMUM ALLOWABLE SURFCACE PRESSURE DURING JOB WILL BE 4200 PSI. CLEAN OUT 2.CONTINUE GAS LIFTING WELL. AT 10,000' BEGIN ClRCULATINO WITH 5,/1000 GALLON HEC OR EQUIVALENT O~; ~XED !N FILTERED INJECTION WATER Al 0.5 BPM. ATTEMPT TO CLEAN OUT TO AT LEAS? 10600' OR DEEPER IF POSSIBLE. KEEP WELL L!F!ING. IF WELL c EIVED DIES, DISCONTINUE PUMPING AND ALLOW WELL TO UNLOAD. E EDTA TO BE MIXED I~ FRESH WATER WITH 1~ NH4CL. Alas~a0,~ GasCons. Commiss}0~ TO SPEED ~P THE MI×lNG PROCESS, THE MIXING WATER A~D Anchorage ADDITIVES WILL BE PREHEATED TO ]50 F PRIOR TO ADDING THE DISODIUM EDTA. EDTA ADDITIVES TO BE DE?ERMINED BY LAB COMPATIBILITY WORK USING WATER AND OIL SAMPLE FROM A24-01. FILTER ALL FLUID THROUGH 2-3 MICRON FILTER FOR REMAINDER OF JOB. BE PREPARED TO PUMP' PRE-FLUSH: 25 BBL ]% NH4C1 MIXED IN FRESH WATER EDTA :120 BBL 35* DISODIUM EDTA/BBL 1% NH4CL MIXED IN FRESH WATER. CORROSION INHIBITOR AND EMULSION BREAKER. FLUSH · 25 BBL 1% NH4Cl M!XED IN FRESH WATER 3. WITH END OF COILED TUBING AT 10300', DISPLACE PRE-FLUSH TO EOT. WHILE RIH AT 7 FPM, PUMP PRE-FLUSH AT 0.8 BPM. DISPLACE ALL CASING TO 10550' WITH 1% NH4CI. FOLLOW PRE-FLUSH WITH EDTA SOLUTION. WITH EOT AT 10550', SHUT FLOWLINE AND BEGIN INJECTING ED?A INTO FORMATION AT 0.8 BPM. MOVE EOT BETWEEN !0550-10300' UNTIL ALL EDTA IS DISPLACED INTO FORMATION. DISPLACE EDTA INTO FORMATION WITH 25 BBL FLUSH. POH. 4.0PEN FLOWLINE AND PLACE WELL ON TEST. CONTINUE TESTING UNTIL LOAD IS RECOVERED AND PRODUCTION STABILIZES. DETERMINE FILL DEPTH 5.BEFORE CALLING OUT SERVICE COMPANY MAKE $LICKLINE DRIFT AND DETERMINE FILL DEPTH. IF FILL IS ABOVE 10580' ZONE CAN NOT BE PERFORATED. 6. LEAVE WELL IN TEST THROUGHOUT PERFORATING OPERATION. RU PERFORATING COMPANY AND'PRESSURE TEST LUBRICATOR WITH 1" LINE FROM OFFSETTING INJECTION WELL TO 2000 PS1. RIH WITH WELL LIFTING. PERFORATE THE FOLLOWING INTERVALS 4JSPF WITH 2 1/8" BAR GUN USING REFERENCE LOG BOTTOMS UP: 10688-698' 10646-672' 10607-6!0' !0587-591' 10549-573' HAVE PRODUCTION OPERATOR MONITOR WELL AND TAKE CUTS BETWEEN RUNS. 7.RD PERFORATORS. PLACE ON TEST WHEN PRODUCTION STABILIZES. DATE- ~ -- 3 ---8"'7 COMPLETIO?: EQUIPMENT DETAIL SIIEET MBS A24-01 2/19/87 8 9 10 11 12 13 NO. ITEM APPROXIMATE TVD. MD. PSI OR 1. OTIS BALL VALVE 2. CAMCO KBM MANDREL 3. CAMCO KBM MANDREL ~2 4. CAMCO KBM MANDREL #3 5. CAMCO KBM MANDREL #4 6. CAMCO KBM MANDREL ~5 7. CAMCO KBM MANDREL 8. CAMCO KBM MANDREL ~7 9. CAMCO KBM MANDREL #8 10. CAMCO' KBM MANDREL ~9 11. GUIBERSON UNIPACKER VII 12. OTIS "X" NIPPLE 13. GUIBERSON SHEAR SUB CA',.: 13 3/8", 61~, K-55 ~ 2010' w/? sx ?" 29#, N-80 ~ 10888'w/2100 sx PBTD = ? TD = 10900' 284 284 2339 2364 3000 3/36 3979 4454 990 3/16 5362 6133 980 3/16 6328 ~243 970 3/16 7065 8063 3040 3/4 ~480 8520 1030 1/4 7802 8887 1020 3/4 8103 9256 1000 1/4 843~ 9627 OR 3/8 8590 9846 86~ 9877 8625 9888 TUBING 3 1/2", 9.3¢, N-80 EUE 8RD ~ 9888 PERFORATED ZONE GROSS INTERVAL HC-IID HC-ItD tlE-HF Ill-IlK tIK-HN IlK-liN IIN-IIR llN-IIR 9966-10026 10050-10091 10113-10133 10187-10215 10245-10295 30306-10366 10390-10475 30500-10534 ' Maska Oil & Gas Oons, 7~ I 7~ 7~ if..../-,,,/.., ,, .t SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON, TEXAS 77001 ' JUNE 7 ,.1985 .-=A.E .=~Lv rD RD. /__/ANCHORAGE, ALASKA 99502 ATTN: BETH CUZZORT SHELL WESTERN E&P INC. P.O. BOX 527 HOUSTON, TX.... 77.001 Attention: LOG FILES, WCK 4147 Gentlemen: Enclosed are 1BL prints of the COMPLETION RECORD Company SHELL WESTERN E&P INC. , Well .[~C,S A ~4201 Field. MIDDLE GROUND SHOAL ., Coun%, KENAi ~ ' ~tate ALASKA on: , Additional prints are being sent to: 1-BL prints SHELL WESTERN E&P INC. P.O. BOX 527 HOUSTON, TX. 77001 ATTN: BRIAN TEPPER,WCK 1128 1 RFOLDED,.SEPI'A~ .... '~----~ ~>~-'.. ~T~ATE' OF, ALASKA ~ /ALAS~ OIL & GAS CONSERV~ION CO~. {3001 PORCUPINE DR. // ~ k ANCHO~GE, ALASKA 9~01 2BL nrints SHELL WESTERN E&P INC. 601W.FIFTH AVE;SUITE 8!0 ANCHORAGE, ALASKA 99501 ATTN: TIM PUTNAM 1MYLAR 1BL nrints ARCO ALASKA INC. P.O. BOX 100360 ANCHORAGE.~ ALASKA 99501 ATTN: JOHN C. HAVARD 1BL nrints SHELL' PLATFORM "A" OR "C" C/O SHELL KENAI OFFICE NORTH STAR ROUTE #1 P.O. BOX 485 WIK RD. KENAI, ALASKA 99611 ~,prints 1RROLLED 'S'EPIA P.O. BOX 107839 ANCHORAGE, ALASKA 99510 ATTN: J.L. WEAVER The film is. RETURNED TO SHELL We appreciate the privilege of serving you. prints DATE: '" Very truly yours, SCHLUMBERGER OFFSHORE SERVICES DAVID RWROL DISTRICT MANAGER April 9, 1985 Shell Western E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Gentlemen' Please find the enclosed Notices of Intention for our Middle Ground Shoal wells #A24-01 and #A13-12. The work will be commencing later this week (around April 18th), so an approval is needed quickly. If there are further questions, please contact Susan Brown at (907) 263-9613. Thank you for your consideration in this matter. Very truly yours, D. L. Yes land Sr. Staff Environmental Engineer Pacific Frontier Division SBB/kka Enclosures SBBA/a ogcc6 STATE OF ALASKA ALASK~IL AND GAS CONSERVATION C~'/MMIsSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL tX1 OTHER I-1. 2. Name of Operator Shell Western E & P, Inc. 3. Address 601 West Fifth Avenue, Suite 810; Anchorage, Alaska 99501 4. Location of Well At Surface: Conductor 28, Leg 4 of Platform A @ 63.45'S and 56.79'E of Center Leg I @ 1627'N and 435'W of SE Corner. Sec. 11, T8N, R13W. 5. Elevation in feet (indicate KB, DF, etc.) ll6'RKB I 6 . Lease Designation and Serial No. AD1 18754 7. Permit No. 73-38 8. APl Number so- 733-20258 9. Unit or Lease Name Middle Ground Shoal 10. Well Number A24-01 11. Field and Pool Middle Ground Shoal mIG" Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Please see attached prognosis for details. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. · The space below for Commission use Title ProduCtion Superintendent Date 4-9-85 Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate P~ognosts Log .n~2~rfo.te Htddle Ground Shoal Fteld STATUS: kiel1 gas ltfttng Z86 BDO (38S cut). PROPOSAL: Run GR/CCL log. Reperforate non-watered out zones. #E~I~ DETAILS: See ettacheg schemttc. PROCEDURE:: !. 4p 1 S. Rig up wtreltne, Test lubricator to 3500 pst, Pull ball vtlve, ~ke drtft run to PBTD, Tag and reco~ any ft11. POOH and rig dram wtrellne, Rig up Skis with lubricator and grease Injection head. Pressure test lubricator to 3000 pst, Run GR/CCL log from PBTD to 9,go0'. POOH. Develop log Ind telecopy to Houston for recommnded per,or&ting depths. Perforate selected tnterva]s (to be supplied) .~tth 4 hole. s per foot ustng 2-1/15" Hyperjet ho11~ carrterun (o' phased) end positioned with a mgnet. Depths wtllgbe referonced from Schlumberger DIL dated 4/13/74. Keep vel1 "-gas 11fred down" while perforated, eHaVe, well shut When teols are tn tubing going tn or out of ho1 then place tn test Rig down SKIS.. Produce well for 12 hours sep~r&to~ for 12 hour test. APPROVED: DATE: TSB:Jc TSB50882 RECEIVED" APR ~ O) 1.985 Alaska Oil & Gas Cons. Commission Anchorage III I I A 14-01 Jt~I ~scrtmtton 2 Otts kll Valve 284 Camco KIN Nandrel IK 3/16 1000# 1364 3 ramco J )bndrel BK 3/16 ggOt 4454  ~co I ~K~I IK 3/16 I70f 7a43 ~o I ~nd~l IK 1/4 10~l ~3 I 7 ~o I ~ndrIl IK 1/4 1030t BS20 8 ~o ~ ~nd~l BK 1/4 1020/ ~7 ~ ~o ~ ~nd~l BK SIIS ortftce J256 I0 ~o ~ ~nd~l ~ H27 11 ~t~rson ~i~cker Vii G~6 12 ~tl X Ntpple 9877 13 ~t~on shear sub 9~8 3 1/2 9.3f/ft. N-80 £UE 8 round 2033 ND 13 318 61g/ft. 0-55 Buttress Liner 10888 ND 7" 19t/ft. N-80 Buttress S.C. Co111rs Perfs. ~966 1OO26 ~'HC-HD 10050 10091 10113 10133 ~ H£-HF 10167 10215 10245 10286~ 1O3O6 HK-HN 10366 103g0 10434.1 1O475 ~ 10464J 10600 #N-HR lOSlS'J 10534 lOSZ4d 10613 bottom tagged 1-25-76 10790 PBTD RECEIVED ~nchorage HN-HR Frick Interval HR-HZ Frick lntervll 10888 7" N-80 2Or/ft. Castng hge 44 Shell Oil Company 200 North Dairy Ashford P. O. Box 527 Houston, TX 77001 July 13, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen' In response to the July 1 letter from The Commission's Mr. William Van Alen, we enclose a complete history for Shell's West Mikkelsen Unit No. 4 well. The well's mud log was transmitted under separate cover last week. The requested reports of production tests, including time intervals, quantity and description of recovered fluids and pressure data were included on the Well Completion Report (Form No. 10-407) which was sent to the Commission on June 3. A separate page of the Well Completion Report Form was submitted for each of the four production tests. No drill stem tests were performed. Also enclosed are the following routine reports' le Sundry Notices - Subsequent Reports for Middle Ground Shoal Wells A12-01, A42-11, A43-23, C23-23, C44-14, A43-11, A42-14, and e Monthly Report of Drilling & Workover Operations for Seal Island Well No. BF-47 #1. Yours very truly, R. G. Hollis Manager Production Administration Pacific Frontier Division RGH .mh Enclosures E£E VEO JUL 2 ~ ,*'** Alaska 0il & Gas Cons. "n ............ STATE OF ALASKA ALASK/~'t~IL AND GAS CONSERVATION CO'~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Shell Oil Company 3. Address John las, P.O. Box 4500, Kenai', AK 9'9611 4. Location of Well .. Conductor 28,. Leg 4 @ 63.45"S & 56.79'"E~frem-Center Leg 1 @ 1627'N & 435"~ from S'E Corner Sec. '11',' T8N, R13W. 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 116' D.F. ADL 18754 7. Permit No. 73-38 8. APl Number 50- 733-20258 9. Unit or Lease Name MiddlP Ground Shoal 10. Well Number A 24-01 11. Field and Pool Middle Ground Shoal IIGII ~ Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation ]~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). June 10, 1983 - Rig.ged up Oti's and Dowell. Pressure tested eauipment to 5000 PSI. Tagged bott @ 10601" Pumned 1000 Gal. P-20. POOH to check for plugged jetsOm '~-20 ~00 C~al. . . . Pumped ), HCL 10% (11000 Gal ) 2000 ~al HF-HCL 1½-7½%, 1000 Gal. HCL 10%. Disnlaced tbg with 17 BBLS diesel. POOH. 14. I hereby)~rtify that/the foregoing is true and correct to the best of my knowledge. Signed Title Manager Prod. Adm.,. The space below for Commission use Date 7/13/83 Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA ~ ALASKA"bI1' AND GAS CONSERVATION C"OW(M ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER 2. Name of Operator Shell 0il Company 3. Address John .Oouolas, P.O. Box 4500, Kenai, AK 99611 4. Location of Well Conductor 28, Leg 4 @ 63.45' S & 56.79'E from center Leq 1 @1627'N & 435'W from SE corner Sec. 11-T8N-R13W 5. Elevation in feet (indicate KB, DF, etc.) 116' D.F. I 6 . Lease Designation and Serial No. ADL 18754 7. Permit No. 73-38 8. AP! Number ~o-~133-20258 Unit or Lease Name Middle Ground Shoal 10. Well Number A 24-01 11. Field and Pool 'Middle Ground Shoal "G" Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] ~ Perforations Stimulate ~ Abandon O St imulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other I--1 Pulling Tubing (Note: Report multiple compietions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] [] t3. Describe Proposed or Corrlpleted Operations (Clearly state all pertinent details and give pertinent dates, including estimated data of starting any proposed wcrk, for Abandonment see 20 AAC 25.~05-170). See Attached. RECEIVED Alaska 0il & Gas Cons. ~mrnrnissle~ 14. t hereby certify that,the foregoing is true and correct to the Oest of my knowledge. Signed ~/~ ~ ~ Title Prod. Admn. The space below for Commission use Oate 5/18/83 Conditions of Approval, if any I j Approved by. 8¥ [ONNIE C, SillJ Approved By Order of COMMISSIONER the Commission Form 10403 Rev. 7-1-80 Submit 'Intentions' in Triplicate and "Subsequent Reports" in Duplicate COILED TUBING ACIDIZATION A 24-01 W.H. ROOM /t4 CONDUCTOR ~/2.8 MIDDLE GROUND SHOAL FIELD KENAI, ALA~' KA Status: Objective' Currently producing 2e~ BDO (30% cut) from the HC through HR Zo~e~. Stimulate pro{!/~ ',~.. ~ ~nbers by acidizing with coiled tubi ncj, Mechanical Details' See attached schematic. Proc,edure' 1. M.I.R.U. wireline and lubricator. Test lubricator to 3000 psi. Pull ball valve. 2. R.I.H. with gauge' run. Clean out tubing as necessary to bottom. Tag and record bottom. P.O.O.H. Rig down wireline. Note' Shut well in at surface 12 hours before acid job to allow well to bUild up. 3. M.I.R.U. coiled tubing and Dowell acidizing equipment. Test lines, tree, and coiled tubing to 5000 psi. Test hydraulic , system and B.O.P. Tubing and lines should be filled with diesel. Filter all fluids through a 2 micron filter. 4. R.I,H. with coiled tubing (no more than 100 FPM). Tag bottom and record depth. 5. Pump following acid treatment' 'Staqe Fluid Quantity/ 1 2 3 " 4 P-20 Solvent 10%' HCL w/additives 7½ - 1½% HCL-HF w/additives 10% HCL w/additives 1000 gal. (24 bbls) 1000 gal. (24 bbls) 2000 gal.(48 bbls) lO00 gal. (24 bbls) Pump treatment at 1/4 bbl/min, and move coil tubing uphole to treat entire interval (9,966' - 10,534') during each sta_qe of treatment. ' RECEIVED MAY I Alaska Oil & Gas Cons, .Gommtsl~lon Anohor~l~ 6. Displace acid to end of tubing with diesel and pump an~additional 5 bbls of diesel to flush coil. P.O.O.H. with coiled tubing. 7'. Bleed off gas column and slowly return well to production. Test' well daily until stable. TSB RECEIVED Naska 011 .& Gas Cons, [,ommisslon DATUM 38' 'A 24 - Ol COMPLETION DETAIL 6-17-74 . · · . Item # Descr'i pti on ~ _ . 2. 3. 4, 5. 6. 7', 8. lB. ll. 12. 13. ,. · -, :.. . . ' PERFS. · 9,966 '10,050 ' HC-HD '10,091 '.10,113 '10,133 ] HE-HF 10,187 10,215 ] HI-HK - 10,245 ' ' 10,306 HK-HN · 10,366 ~ 284 . ..,., 2364 4454 6113 · '. '" 7243 ' 8063 ' , · '. 8520 . .-" 8887 .... '. Otis Ball valve Camco KBM Mandrel BK 3/16 lO00#. Camco'KBM Mandrel BK 3/16 990# Camco KBM Mandrel BK'3/16 980// Camco KBM Mandrel BK 3/16 970# Camco KBM Mandrel BK 1/4 1040#' Camco KBM i.,an~ ;"~'.~'i BK 1/4 1030// · Camco KBM ~,~L~ BK'I/4 1020# Camco KBM Camco K[~M . Dummy Otis X Nip~ ~: , Guiberson shear sub BK 5/16 orifice 9256 · 9627" ' . . 9888't.":". "" :"-,. Tub i ng Deta i 1 '1 .-', .. . , , 3½ 9,3#/ft, N-80 EUE 8 Found ? ".'.: ..... ... "' '" '; "" Casing .Betail "'..-' '~'. '.'..'i..',.' ..'":"..':"i.~'·I ": :". · . ,, 2033MD '13 3/8 61#/ft. J-.B5 Buttress· :.:. I ' ' ~ · . ' " ': ":""..."~ ".' 'i"~.'.-, '.'":' 'i'~.. Liner -' '"'::'""~':'"'~"'; "'t.','~.,'"'.'"',·.' ':".' t'::,')' 10,888MD 7'! 29#/ft, N-80'~Buttress S,C. Collars ";..., ?.....'-. · .... 10,390 ' 10,475 ~1 'i 10,500 HN-HR 10,515 ' 10,534 10,526 ] HR-HZ Frack interval F I 1~,613 bottom tagged 1-26-75 , ,9o · 10,888 7" N-80.?~/¢f RECEIVED · a.l~ gil ·& GaS Cons. L, ommis~rOn ~0,434 10,46~, ] HN-HR Frack interval O. K' (~[lbxeth, ~~~. NB~t~r 14, 1977 She~ ~ ~ "A" 24-01 .= . ~ Drlg. Permit No.~.,_ Opera tor Satisfactory Type Inspection Yes No Item ( ) Location,General ( ) ( ) 1. Well Sign ( ) ( ) 2. General Housekeeping ( ) ( ) ~. Reserve Pit-( )open( )filled ( ) ( ) 4. Ring Safety Valve Tests 0<) ( ) 5. Sur'face-No. Wells (~') ( ) 6. Subsurface-No. Wells / ( ) Well Test Data ( ) ( ) 7. Well Nos. , , , ( ) ( ) 8. Hrs. obser , , , ( ) ( ) 9. BS&W ,--,--,-- ( ) ( ) 10. Gr. Bbls. , , ( ) Final Abandonment Alasl,.a Oil and Gas Conservation Committ Field Inspection Report Well/Platfm Sec ' T R M · , Represented by~__~ ~ ~-~ Name & Number2~>ll'./~_~/~/~.-.~.'--~,~.~.j Satisfactory Type Inspection Yes No Item ( ) BOPE Tests () () () () () () () () () () () () () () ().() () () () () () () () () () () 15. "Casing set @ 16. TesL fluid-( )wtr.---]-~ )mud ( ) oil 17. Master Hyd. Control Sys.-~psig 18. N2 btls. ,__,__,__psig 19. Remote Controls 20. Drilling spool- "outlets 21. Kill Line-( ) Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs fl~s 24. Chokes-( )Remote( )Pos.(-~dj. 25 Test .Pluo-( )Wellhd( )csg( )none 26. Annular Preventer, 9siu 27. Blind Rams, psi~- ( ) ( ) 11. P&A Marker ( ) ( ) 28. PiPe Rams ~psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psi¢ ( ) ( ) 14. Pad leveled ~ ( ) ( ) 31 Safety Floor valves--Y(- --)-BV ( )Dart Total inspection observation time~)/days Total number leaks and/or equip. fa i 1 ures t~/(9~/~ Remarks. cc:~/~ ~JF~J~'~otif~ ~~daYs S H ELL OIL COMPANY SHELL BUILDING 1008 WEST ,SIXTH STREET LOS ANGELES, CALIFORNIA 90054 State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention Mr, H, L, Burrell TELEPHONE 482-3131 Gentlemen: Enclosed for your information are the completion data for ®ur Shell- Atlantic-Standard Middle Ground Shoal A-24-1 well· Included are the following: 1, Completion Report (form P-7)' in duplicate. 2. Well History 3, Two sepias and two prints of all electric logs· 4. Directional Survey. Very Truly yours, 3DM:MJ N G McKim · · Division Operations Engineer Enc lo sure s cc - Atlantic Richfield Company (w/Enclosures) - Standard Oil Company of California (w/Enclosures)' - Amoco Production Company (w/Enclosures) - United States Geological Survey (w/Enclosures) - Files (w/Enclosures) jur, l 2 o i~74 [/{ill:II [ ) I 7 ~ ~ SUBMIT IN DIe'CATE* STATE OF ALASKA ~SeE-other :n- structions on OIL AND GAS CONSERVATION coMMITTEE re,,e:'~e s~de: iiiii i iii ii i i _ WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* ' [] ' [] U] ' TYPE OF WELL: on, ~AS W El.I, w ELL DR ¥ Other b. TYPE OF COMPLETION: W E[,I, OV ER E N BACK RESVR. Other __ NAME OF OPERATOR Shell 0il Company A~DRESS OF OPERATOR 1008 West Sixth Street, Los Angeles, California 4. I,OCaTION OF WELL (Report location clearly and in accordance with any State requirements)* xt~,,~c~.Cond. 28, Leg 4 @ 63.45'S & 56.79'E from center leg 1 @ 1627'N & 435'W fr. SE coP. Sec. 11, T8N, R13W At top prod. interval reported below 3675' N & 2494' E from surface At total depth 4113' N & 2286' E from surface 13. DATE SPUDDED [14..DATE T.D. REA. CHED [15. DATE CO,NiP ' 2-15-74 . [ 4-12-74 [ 4-22-74 10,900 (9486) 10,S00 (9399) ~ow~-~¥, ao~b~oons . ,900 22, PRODUCING INTERVAL(S), OF THIS COMPLETION--TOP, BOTTOM, NAME (MD AND TI;D)* 10,434-10,524 (9086-9163) G Pool 24. 'FYPE ELECTEIC AND 0THEi% LOGS'RUN 5. API NUMERICAL CODE 50- 133--20258 6. LEASE DIgSIGNATION AND SERL~L NO. ADL 18754 7. IF IND1A.N, ALLOTTEE OR TRIBE NA_M~ None 8. UNIT,FAt~M OR LEASE NAME Middle Ground Shoal 9. WWX,L NO. MGS A-24-1 10. FIELD A2qD POOL, OR WILDC'AT MGS Field, G Pool 11. SEC., T., R., M., .(BOTTOi~I HOL~ OEKIECTIVE) 26. LINER lqlgC OI{.D SIZ]D [ TOP (MD) I t~OTTOM (AID) SACKS CEMENT* [ [ · i ii i ii i iiiii i i i 28. PERFORATIONS OPEN TO PRODUC4I'IO1~l (intcrval, size and number) 1/ft. @ 10,515-10,524' 1/2 ft. @ 10,434-10'464' 1, T8N, R13W, S.M. 12. PER1VIIT NO. 73-38 -- lI~. ELEVATIONS (DF, RKB, aT, GR, ~PC)*ll7. ELEV, CASINGHEAD DF 116' INTERVALS DRILLED BY CABLE TOO 1.,8 23. '~VAS DIRECTIONAL SURVEY MADE Yes ,i I ;~A/IOUNT PULLED Dual Induction Laterolog, Sonic, Density, Cement Bond Log · i -- i Il i l ~. CASING RECORD (Report all strings set in well) DEPTH SET (1VID) I I-IOLI{I SIZE CASI2{G SiZE WEIGHT, LB/FT, ]~ GR,ADg [ ' CF-aIILNTING RECOP~ " 7" ~ i 29 10,898' 9-7)'8 2100 sacks 27. TUBING RECOP~D none none SC}%EEYN (MD) SIZE DZP~ SET (MD, [ PACI;~R SET 9894' ' i 9840 29. ACID, SilOT, FZA~CI'URE, CE~,IENT SQUEZZE, ETC. Dla,~/l[i INTF_~V_4J~ (MD) AMOUN'£ 2~ND KIND OF MA~I~EZIAL USED 30. PRODUCTION DATE FIRST PIIODUCTION I Pl%ODUCTION MEIIiOiD (Fiowii]g, gas lif~, pumping--size and type of pump) IV;ELL STATUS (Producing or ~' T BIN Ow, U G ICASLNG PRESSURE lCALClYLATED OIL--BBL. M ; I ~ f ' l 32, LIST 0~I ATTACHMmNTS ' 2 sepias & 2 prints of logs, well history, well survey, core records ' 33. I hereby certify that the foregoing and attached information is complete and correct as ~termined from all:available records i1[i ~ i ii *(See Imtructio~s ~8 Sp~ces [or Additional Dmo o~ Reverse Side) INS ~ RU~. ~ I~ONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lan:Is and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- mentsgiven in ether spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separate preduction from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prcJucing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional inte, val to be seperately produce,-'/, show- ing the adkJitional data pertinent to such interval. I~,m26: "Sacks Cement": Attached supplemental records for this well shoul:J show the details of any mul- ., . tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~l. (See instruction for items 20 and 22 above). 34. SUMMARY OF ~'O~VIATION TESTS INCLUDIN(; INTERVAL TESTED. PHESSURE DATA A_N'D ~OV~l~ OF OIL GAS. 35. G~GIC MARK~ WA~ AND MUD ~ ~ '~'- 8112 ' .~:~ ~~ E Pool 9270' <.~ c_ F Pool 9663' 8434' ?~..~.~..-~: >.:? ~ G. Pool 9965' 8689' " ~a~' 6hn.~ mayA. Aqn'ACll BRIEF D~CgtP[~O~S O~ LITI[OLOGY. POnOSITY. FRAc~R~. APP~T ~8 ... ._ Core No. 1: 10,410-10,468', recovered 58' ) Core No 2: 10,468-10,486' recovered 17' · , ( see attached core record Core No. 3: 10,486-10,523', recovered 22.5') .. ...................................................... PD 4A {Rev. 5-63) Printed in U.S.A. Middle Ground Shoal , , Cook Inlet, Alaska (~OUNTY} DAY DF..PTHe , ~, 'lfRO~l I , TO Surface Location: Conductor 28, Leg 4, Platform A. 'Conductor 28 at 63.45' South and 56.79' East from center Leg 1 at 1627' North and 435' from Southeast corner of Section 11, Township 8 North, Range 13 West, S.~. Elevation: D.F. 116' (above MLLW) February, 1)74 Spudded 7:30 A.M. 2-15-74. Drilled and surveyed 17-1/2" hole to 2011'. 15-19 317' 2011' Circulated hole clean. Surveys: Depth~ Deviation Bearing Depth Deviation Bearing 400 3 o N12E 968 32 o N34E 430 4 ° N45E 1032 33 ° N34E 466 5 o 15' N59E 1122 32 o N34E 497 6 ° 15 ' N55E 1245 32 ° N34E 528 7 °45 ' N63E 1432 32 ° N33E 559 9 ~ N51E 1651 32 ~ 30 ' N31E 595 11 ~ 15 ' N56E 1722 30 ~ 30 ' N42E 710 16 ~ N42E · 1809 29° N45E 806 22 ~ N34E 2011 29 ~ 15 ' N43E ~0-21 ~// Ran 50 joints of 13-3/8", 61f~, K-55, Buttress casing with shoe at 2010', fillup collar at 1973'. Circulated hole clean. Pumped 10 bbls. of fresh water ahead of 2000 gals. of pre-flush (Halliburton WD-7) followed by 10 bbls. clear water. Mixed and pumped 2350 cu.ft, of 96 pcf slurry class G cement blended with 10% gel, followed by 200 sacks class G neat 118 pcf slurry. Displaced with 1730 cu.ft, mud. Lost returns after displacing 1000 cu.ft. Bumped plug with 1500 psi-float held okay. Opened D.V. collar at 1000'. Circulated hole, had 200 cu. ft. cement returns at surface. Circulated until clean. Pumped .10 bbls. water ahead of 200 gals. of pre-flush (Halliburton WD-7), followed with 10 bbls. water. Mixed and pumped in 900 cu.ft. API class G cement, 118 pcf slurry, mixed with Inlet water. Displaced with 910 cu.ft, mud. Closed D.V. collar with 1800 psi. Lost returns while displacing through D.V. collar. Did not get any cement to the surface. Tested casing head with 2000 psi-okay. Flanged up B.O.P.E. , CONDITION AT ' ~ . OF PERIOD , , · ,z= ~o. TO 13- 3/8'" 2010 ' 17-1/2 317 2011' _ Dm~P~ 4-1/2" 16.6f~ ~D 4A.(Rev. 5-63) Printed in U.S.A. ~-~ ~"~ wl~ ,o. A- 24-1 i i iii i Middle Ground Shoal DRTT.T _TNG RBPORT Section 1 (FIJ~I,.D) ' ' ~L~)~, ~,I~,~OD ~'%]Z)~G ' ' (iI~GTION On. L/.&Ill) _ _Cook Inlet, Alaska March 29, 1974 T8N~ R13W~ SM (COUNTY) ' " ' (TOWNBHIP OR t~ANCHQ) DAY DEPTHS REMARK8 Febr~,ary., 1774 22 " 2Ol1' Mixed 125 sacks of class G cement. Displaced with 1" pipe hung at 145' in the 13-3/8" x 17-1/2" annulus. Had good cement returns to surface. Ran bit, drilled out D.V. collar at 1008'. Drilled out float collar at 1963'. Tested casing, pipe rams and Hydril to 1500 psi. Drilled out cement and shOe at 2010' 23-25 2011' 3763' Drilled and surveyed 9-7/8" hole to 3763'. Stuck drill collars while surveying at 3749'. Unable to work free. Spotted 140 bbls. diesel, in stages, attempting to work pipe free. Surveys: ,Depth Deviation · Beari~ng Dep_th Deviation Bearing 2134 29 o 15 ' N43E 3134 28 °30 ' N42E 2344 30°45 ' N42E 3352 28 o N39E 2607 30 o N42E 3573 26045 ' N38E 2917 28 °30 ' N45E 3751 27 ° N33E 2/26 ~?~3 Circulated and conditioned mud. Ran Dialog free-point indicator. thru Found pipe stuck 2120'-3749'. Circulated and conditioned mud. Backed 3/1/7Z pipe off at 1987'. Chained out of hole. Made up 7-5/8" O.D. washpipe, safety joints, jars, four 7'~ D.C.'s and ran in hole. Recovered all drill pipe and 2 stands of heavywall drill pipe. POH. Made up 9" O.D. washpipe, safety joint, jars, two 7"x30' D.C.'s, 9-7/8" stabilizer, two 7"x30' D.C.'s, 9-7/8" stabilizer. RIH. Unable to wash over fish. Pulled out, redesigned shoe. Ran in and freed fish. POH. Made up a~lJ ran drilling assembly. M_a.-ch, 19 74 2-29 3763' 9746' Directionally drilled 9-7/8" hole to 9746'. Surveys: Depth Deviation Bearing Depth Deviation Bearing 3785 27 o N33E 3895 27 °30 ' -N45E ' 3815 2 6 °30' N34E 3959 28 o N46E 3845. 2 6 o N38E 4115 28 o N47E 3875 2 6 o N43E 4333 27045 ' N48E CONDITION AT end 0~' H01.1S ' c~$~No s,zE I DEPTH ,,z, ,.o. 7o 13 3/8" 2010' 17-1/21 317 20]'1 9-7/8 2011 9746 _ mmn~mm 4- 1/2" 16 6# G! ZE~?-- ' ,, . ..... ,,~ , , ,.. .. .,,,. , .', PD 4A (Rev. 5-63) Printed in U.S.A. ~ O~lr~ (~O~p~' ~-~ Middle Ground Shoal DRIVING REPORT (FIELD) , Coo~, Inlet, ~laska April ~, 1976 w~u..o, A- 2 4-1 Section 1 (IEGTiON OR LIRAS/,) ~8~, R1,3W~ SM DAY DEl=THE REMARKI · FROM I TO [ i iiI illlI Ma~ch, 1974 2-29 qT~z~ Surveys: Depth Deviation Bearing Depth Deviation Bearing -4516 30 °45 ' N49E 7845 26 o 30 ' N14E 48 68 33 o 15 ' N47E 7985 26045 ' N12E 5110 33 o N48E 8159 25 o 30 ' N06E 5395 33° 15 ' N48E 82 37 2 3 o 15 ' N16E 5645 34030 ' N48E 8304 22 o 15 ' N22E 5862 35 °30 ' N49E 8372 22 o 15 ' N22E 6112 34 o 30 ' N49E 8431 2 3 o N20E 6225 30030' N49E 8523 27° ~ N14E . 6421 31°30 ' N46E 8759 29° 15 ' N08E L 6580 32 o N47E 8866 30 °45 ' N04E 6875 31 o N44E 8959 33 o 30 ' N02E 7028 29° N42E 9002 35° due N 7254 27030' N41E 9119 35030' N01W 7568 24°45 ' N28E 9623 34° 15 ' N08W 7651 25030' N23E 9744 33°30 ' N09W 7754 26°15' N19E 30-31 9746' 10,225' Directionally drilled 9-7/8" hole to 10,054'. Ran Schlumberger DUal Induction-Laterolog, run 1) 10,054'-2,011'. Survey: Dept.h Deviation Bearing 10,054 32000' N16W Lost one cone off bit. Apr il ~ 197~ 110,225' Waiting on parts to repair rotary clutch. Survey: Depth Deviation Bearing 10,225 33000' N18W 2 10 225 10,235 Repaired rotary clutch, reamed 10,135-10,225' milling on lost come CONDITION AT end OF i-iOLE CASINO size DEPTH GET i _ , ~ S,Zt ,,, FRO~4 TO 13-3/8" 2010' 17-1/2 317'2011' 9-7/8 2011'.10235 mmLL ~m~ 4- 1/2"- 16. GIZES - ,_ ...... -, .... , ,~ ' PD 4A (Rev. 5-6'3) Printed in U.S.A. ~ZA O~-. ~O~4~ANY '~ ~'~ ws~.o A- 2.4- Middle Ground Shoal DR JTTNG R PORT Section 1 ........ (FIELD) _ EO~, ~)~.,~C~ ~T~Z~G ' (.I;GTION OR LEAII0 Cook Inlet, Alaska April 20, 1974 T8N~ R13W, SM -' ' i i i , , , i i i i i (cOUNTY) (TOWHIHIP O!~ RAHCHO) DAY DEPTHS RF. MARK8 _ Apr'il, 197+ 3-5 t0,235' [0,460'~ Drilled to '10,410' I . Ran Christenson core barrel with 9-7/8"x5-1/4" diamond bit. Core ~/1, cored 10,410-10,468'; cut 58', recovered 58'. 6-8 10,460' [0,562'i Core ~2, cored '10,468'-10,486' ; cut 18', recovered 17' Core ~3, cored 10,486'-10,523'; cut 37' recovered 22 , · · Drilled 10 523'-10,562' changed out rotary table sprocket 9-12 [0,562' 10~900'~ Directionally drilled 9-7/8" hole to 10,900'. Conditioned mud for logs. (T.D.) Surveys. Depth Deviation Bearing Depth Deviation Bearing_ 10,776 31015' N28W 10,900 29°30' N32W 13 10,900 Ran Schlumberger: Dual Induction-Laterolog, run 2, 10,875'-7,000'; BHC Sonic, run 1, 10,862'-7,000'; GR-FDC, run 1, 10,838'-7,000'· PML tool failed· 14 PBTD 10~800 Cemented 7" casing at I0:888' with 2100 sacks· Ran 260 joints of 7", 29f/, N-80 Buttress casing with special clearance couplings, equipped with plain cement guide shoe at 10,888' and fillup collar at 10,800' Centralizers placed at: 10,004', 10,045' 10 088' · , , , 10,170' 10 254' 10 297' 10 383' 10 420' 10 546' 10 589' 10 672' , , , , , , , , , , , , , , , 10,714', 10,801', 10,844', 10,883'. Mixed and pumped in 2100 sacks API class G blended with 0.5% Halad 9 and 0.6% CFR-2. Bumped plug with 2000 psi. 15-16 PBTD 10,800=Nippled up. Tested tubing head to 3000 psi. Changed to 3-1/2" pipe rams. Tested blind rams to 2000 psi. Ran bit and scraper in on 3-1/2" tubing. Found top of cement at 10,790'. Conditioned mud. Tested Hydri] to 1500 psi. Ran Schlumberger GR-CBL-CCL log 10,756"-8,800' at 0 psi. Pressured to 1000 psi, re-ran log. 17 PBTD 10,800 Conditioned hole to 10,790'. Ran temperature survey on piano wire line between 10,750' and 100' 18-20 PBTD 10,800 Attempted to run Schlumberger CBL log through 3-1/2" tubing-tool failed. Pulled tubing, attempted to run Schlumberger 4" CBL-Sonde-tool mal- functioned. , CONDITION AT end OF .... HO~ CASINO siZE DE~H , , · ,z. ~.~- .~ 13-3 " 2010 ' 0,sss' 9 7/8~011' 1090~ ...... DRILL. PIPE GIZE~ , , , ,, ,, / SIGNED PD 4A (Rev. 5-63), minted in U.S.A. ~ O]/, COM:P.~g~ A-24-1 /'% ~ wilt, NO., Middle Ground Shoal DBTTJT.TNG RBPORT Section 1 (FZi~LD) ~/0~, ~J~3~OD ~Z~TO (81,GTlON OR I,.1~110 .... Cook Inlet, Alaska April 22, 1974 TSN, R13W, (COUNTY) · (TOWNIHIP OR DAY DEPTHS ' FAOH I _ TO RF, MARKI · Ap~i!; 1974 · 18-20 PBTD i0,800~ Loaded out Schlumberger. Rigged up Dresser-Atlas, ran CBL-CCL 10,755'- 8,600' at zero psi and at 1800 psi. Ran in tubing, displaced out mud with filtered injection water. Displaced out water with diesel. Pulled out.. 20 PBTD 10,800' Ran 3-1/2" tubing equipped as follows: Guiberson shear sub at 9894'; Otis Q nipple at 9882'; Otis X nipple at 9871'; packer at 9840'; KBM mandrels at 9554', 9122' 8784' 8327' 7599' 6378' 4656' 2510' and , , , , , , , Otis ball valve nipple at 283' Set packer at 9840' landed tubing · , · Ran temperature survey on piano wire unit 10,700'-100'. Removed B.O.P.5 Nippled up wellhead. 21-22 PBTD 10,800 Tes~.ed wellhead to' 3500 psi. Installed flow line. Gas lifted out 335-~ bbls. diesel· Rigged up Dresser-Atlas. Shot one jet per foot 10,515'-10,5'24', using 2.5" Jumbo Jet Bar Gun. Tubing pressure in- creased from 520 psi to 540 psi. Shot one jet/two feet at 10,434'- 10,464'. Tubing pressure 645 psi, casing pressure 620 psi. Placed well on gas lift. Released rig 8:00 A.M. 4-22-74. CONDITION AT end OFP~'RIOD ,,. . B · m,, r.o. '~o 13- 3/8" 2010 ' _ 17-1/2 317' .~ 01]~ ' 7" 10,888' 9-7/8 2011' 10900' DRILL PIPg SIZES .... . , .. , / ., , , .,, / - ~/' IlONF-.D PD ,~ ) PRINTED IN U.S A. - ~' WEEK ENDINO___~T~]L 6: 1.97& 10,Al. 0' 10,A68' CORE FROM TO Lennon, McLeh.~ney CORES EXAMINED BY_ SHELL ~,L CO~tPANY CORE RECORD AREA OR FIELDMi----ddle Ground Shoal COMPANY_ Shell. Oil Co MGS A-24-0! LEASE AND WELL NO TO RECOV- FORMATIONAL. STRUCTURAL AND PROBABLE PRODUCTIVITY DESCRIPTION OF CORE ERED 0,468 58' Used Christensen convention~.l core barrel with diamond bit 9-7/8~ x 5~~t ligh~ massive, lo---'--~,'er fine 'grained, moderate sorting, poor P&P. ~Grgins are ~u~rtz, feldspar, plus other dark minerals. Clay filling Pebbly .s~n~, light-dark gray, massive, lower fine to ~ebbles, pebbles common .... t~' ~", rare to 1" clay filling, poor to no P&P. Dark minerals make up about 1/3 of sand. Very hard, well consolidated. Not c~lcareous . , omerate light-d~rk gray, massive, hard, medium grains to pebbles to ~" dominantly Qu~rtm,gr~nite, bas~t, etc. Poorly sorted, qusrtz cementing ( or heavily cl~y bonded · Pebbly S_qnd, light gray, massive very h~rd, medium grained ['o ~" few pebbl '' '~o l", poorly sorted, ~uartz (?)cementation or heavily clay bonded, poor Conglomergte, light-dark gray, m~ssive, very hard, medium grains to pebbles 2-3"(one @ 10620.5' is as large as core, basalt), poorly sorted. Some wLth fetrty well sorted conglomerate pebbles to%". Cementing ~s above. Poo'-P&P. Fair st.~in, fluorescence, _cj{t 'and cut fluorescence 10418.5-A28-+' __ Foo~' to no show~, lO~.A28-A38~~'- F~ir shows 10~438-443~. Pebbly s , dark jr~¥, foir!v friable, medium gr~ined sand with well rounded f - ' .. pebbles ~ - 3/. , moder~.e sorting,massive, poor P&P, grading to below ~ ~ ray massive, very herd, medium grains to 2-3" Conglomerate, li.~h~-dark g , pebbles, poorly snrted, heavily ct~y filled. Poor P&P. P~bblv sand_, dark gray, massive, fairly friable, medium grained send with rounded pebbles ~ - 3/4", poor P6~.~. Congl_omerote, light-d~rk gray, massive, very hard, medium grain to 2-3" pebbl~ ~u.~rt? cementing(?) heavily cl. ay filled, nil P&P Pebbly Spnd, light gr,~y, f~irly friable, thick bedded medium grain with ~ - ~" oebbles, some carbonaceous material (some to 3/4" long), clayey, poor Cmnzlomer~qte ~s at 10,.~51.5~10,458.5' DiP CORE INDICATIONS OIL-- GAS CORE OR DITCH fluor, cut flu'or, cut ~t Stl~, > t uor 'luor, cut :S %,.or, cut ~luor, cut fluor, cut Notes: l) See attached fo~ sho'., description 2) Special s~mples t~ken @ 10,460-46l'; 10,455.5-456.5'; 1.0, 4l 7-&18 ' . · I~.I~2749 ~fRev. 9-62) · Printed U.S.A.'" Dine April. 6, 1974 Type Side'~all Sampler Cnnvention~! Core Cores Examined By Lennon, McLehaney SHELL Oli ;OMPANY West Coast DIVISION -"o;u~_-';~,~.'~'u. CORE RECO~D Core ~ I: 10,410-468' Section Area or Field Middle Ground Shoal Well MGS A-24-0l , , I , I IJ J I ,,, , I I Ill ii , Ill I I j , , ,, Il ' ' ' DEPTH REC R~JN DESCRIPTION ~'LITH OIL SHOWSe~ SYMB Sample Oil Fluor.] c.t I Summary, ' % Hydro- Color Color $ho~ Oil corbon of of Cut No. .. Stain Odor % Int~no Coior Cut Fluor. Avg. 10,All_ ...... ~{1 s'taining was '{ight tan, where prese~'t was gen'- ........ 3- ' ~ .... 2 2 YG 1.5 2 " 10,413 er8lly distributed throughout 3 3 '2 2 YG 1.5 2 10,Al7 L.0a ~.0~ 2 2 YG 0 l 10,A19 2 2 2 2 YG 1.5 z.;~! ......... ~3 3 ---2 2 Y 1~)5 2, [0, .- 10,A24 2 3 l 2 G 0 1 0,426 1 3 l 1 G 2 2 10, A29 . 0 0 0 0 .... O 0 !0,&32 0 0 0 0 0.5 l 10,438 0 .0 0 0 0 0.5 10,44l 3 3 2 2 YG 1.7 2 l O,..-:, 4. ~ .. . 3 3 ? ? YG. ? 2 !0,&46 3 3 2 2 YG 2 2.5 10, ,~[~8 0 0 0 O. ~0 ~ ,~0 -FO'-' 451 3 3 2 I'~ ~. ~ 10,A54 2 2 2 2 YG 1.3 1.5 1.0, A57 3 3 2 2 YG 2 2 10,460 3 3 2 z ~ 2 2.5 I0,A62 3 3 2 ~ 'fG 2 2.5 10~ -,'.-6 ~ -~. 3 3 2 2 YG 2 2 10,&63 ' 3 3 2 2 YG 1.b' ,Ill I I I I I I eLith. Symbol, % sand: C,0-5%; 1,5-$0%;Z, :50-65%;:5,65-85%; S,85-t00%. amSee Legend for Oil Shows (over) PD 4 RECOV- ERED .,pRINTIrO INU.S.A. WEEK ENDING~ ~D',~'{1.. 7,~ 1.97[,. CORES EXAMINED BY_~II~ }'[C~here'; SHELL-O~L COMPANY CORE RECORD FCRMATIONAL, STRUCTURAL AND PRO~3ABLE PRODUCTIVITY DESCRIPTION OF CORE AREA oR FIELD-Middle Ground Shoal COMPANY_Shell 0'[l Comp~ny ~);. LEASE AND WELL CORE INDICATIONS OIL-- GAS CORE OR DITCH U-ed Christensen conventional core b~rrel ~,ith Diamond bit 9-7/8:'x 5.~" · Conglomerate, %ighr-.dark gr~y, massive, very hard, medium gratns to 2-3" pebb, he.,vi!y cl~y filled, nil P~. L{ght spotty st~in and fluorescence. Sharp transition to b~low. Not c~!careous S~nd, light bro,,n, m~sstve, f~irl7 fri~ble, medium gr~ns, moderate sorting, ~l~y bonding, fPir to poor P&P. Some ~on~s with scattered pebbles up to .3 ~ ~t 10,&70.5'. Abundant fine c~rbon~ceous material. Some bI~edin$ qf oil ~.~hen' f~rst removed from core b~rrel. ~e~.b.].y s~nd, light gray, ~s~ive, hard, medium grain with many pebbles heavily clay bonding, poor p~ib.bly .s~n~_ 8s shove with very large irregular c~rbonaceous particles; with pebbl..s becoming more 8bund.~nt Conglomera~?, light-d~rk gr~y, massive, h-rd, medium gr~ins to 3" pebbles, poo:ly sorted, he~v ly clay bonding, ~uartm cement~.ng(?), poor to nil Pebb!y s,~nd, light army, h~rd, medium gr~ined with m~ny pebbles to ~'~ clay bonding, mbund~nt carbonaceous material, poor Cong!omeret~, light-dark grmy~ mmssive, hard, medium gr, ned, to 1" pebbles, "h~avtly clay bonding, abundant carbonaceous m.~tertal, poor to'nfl P~. Notes: l) See attached for show description 2) Special sample taken at 10,671-472'. fluor, cut fluor, cut,i fluor, -&77' fluor, cut cut cut L.~[-2749 ..(Rev. 9-62) · P'~fnted'" O.S.A~ .... SHELL OIL ;OMPANY .. . · West Co~st DIVISION Da?e April 7, 1974 ................ 'Section I Tt~p, 8N ' ' ' SIDEWALL CORE RECORD TYpe Sidewall Sampler' Conventioncl 'Core ............ Area or Field ..... Middle Ground Shoal Cores Examined By Lennon, McLeh~ney Core #2: 10,468-10,486, Well MGS A-2&.-O! ..... LJL . ,I . [ ! . I Ull I I II Il I Il ~ 'LITI~ III I I l DEPTH IRECRUN DESCRIPTION Oil SHOWSe~ SYM~ r'~~' Cut /$ umm:ryI ..... ' ......... ' ......i ....~ample Oil Fluo ._ % Hydro- Color Color ~' ,- Oil carbon of of Cut No, ,, , . ~Sloin Odor % Inten. Color Cut Fluor, ~ S" 10,468 All core wae 'stained, where shown, with light tan 1~o6 a! 1.6~' 2 2 YG 1.3' '1o5 -- lO,Z~70 staining 3 3 ' 2 2 Y 2 2 !0,57/,. ~........ ~ ~ 2 ~ yC 1.5 1.5 10~476 0 0 0 0 0 0.5 !0,477.-~ 1.0 a 3 2 2 YG 1.3 1 i0,47~ 3 3 2 2 G L.3 1.5 10,481 3 3 2 2 YG 1.5 1.5 10,483 . 3 3 2 2 YG 1.7 1.5 ,, , , eLith. Symbol,% sand: C,0-5%; 1,5-50%;Z,30-65%;~,65-85%;S,85-I00%. ~=See Legend for Oil Shows (over} ~'""~"' SHELL OIL_ COMPANY U?5.A. "~ - ?'~ AREA OR F;ELD ~zd.~le ' .. CORE K CORD co.. · EXAMINED BY ~e~o~ }~c~ehe~e7 ( "HEAVY" OIL PROVINCES) LEASE AND WELL NO · "OIL SATuRATIoN OBSERVATIONS I ' ' VISIBLE OIL c3 Rock type, color, stratification hardnesl and cohesion, other features, e.g., fossils, cements, ....... . n' clay occurrences, carbonaceous material, dip, odor (oil/HzS) grain size (range and predom, size), .... b./ , SAMPLE LIQUID OIL ' STAIN ~ COLOR COLOR OF SHOW LITH. FROM TO O silt and clay content, sorting, groin shape, est. of porosity, perm., and saturation. DEPTH STR~NGERS OR ONLY. OF CUT AND SYMBOL SYMBOL ~j GLOBULES A.M.S.~ FLUOR. NUMBER n' A.M.S.~ 10,486-487 1 Conclomerate~ light-dark gray, massive, hard~ medium grain to 1" pabb[~s~ poorly so,tad, heavy c1_e¥ bond~ng~ poor to nit ~&~ sharp contaat w£th below. ~ot 0,487-487.5 0. S_~d, light brown, thickly bedded, f~irly h~rd, upper fine to medium lite uniform ~t~in, fluor. grain, moderate sorting, clay bonding, not calcareous, poor P&P [0,487 5-488~ 5 1' Pebb~ly..s~.nd~, light gray, thickly bedded, very hard, medium green to ~" no show~ pebbles, abundant carbonaceous materiel, moderate sorting, heavy clay bonding, poor '.0, ~,881.5-508.5 ~0' S?nd, light gr~y, massive, very hard, lower-upper fine grain~ well sorted, abundamt carbonaceous material, silty, heavY clay bonding, poor P&P. No Shows, except as noted below. @10,490: As ~bove with light spotty stain & Fluorescence, fairly friebl e, with some tocnl patches with no shows ~i0,A94: As ebove but with even light ste!n & fluor. Increases in carbonaceous m~teriel appears finely laminated with c~rbonmceous on bedding planes @1n 4.07: As ~bove but a 6" mon~ with no shows @I0,&97.5-499.5:.. As above with light stain & fluor. @10,&99.5-502: , As above with no shows. @1~,502-508.5: kAs above with light stain & fluor. Note: 1) Cc,re fractUred along bedding planes (?) 35° to 40°. 2) S[.eciml s~mple taken @~I0,490-A91' 3) SSe attached for shows. $'¢~-~'3t.,: ~;-~:~.&~, (~m~ $~'&t.F. [Sa. NO O-*5"k.I. I-CL~.Y OR SHALE: WITH SAND STREAKS (SAND 5-Z5%). 2~CLAY OR SHALE: A/~D SAND {~AND 25-60%). ~-SAND WITH SHALE b'TREAKS (SAND 60-DO%), S-SAND (90-100%). ' -'~ ~'"'" (Rev. 9-62) I.~Z ~-, z,/~ Prin~ed ~ U.S.A. SHELL OII~"OMPANY West ~o~st DIVISION Dote April 8' !974 ..... Section ~L T~.~p. 8]~1 R,qe. SIDEWALL CORE .RECORD Type Sidewall Sampler Conventional Core .... ---:~;~;'~--':"'~=~ ...... uv-~ .......... '------ Area or Field Middle Ground Shoal 13W Cores Examined By Lennon~ McLehaney Core #3:10,486-10,523' Well MGS A-24-01 DEPTH RECfRUN ' DESCRIPTION '~ LITH OIL SHOWS~ SYMD I I I Il I 1 i ' I l Sample Oil Fluor. Cut Summ~ry % Hydro- Co~or Cotor Show Oil carbon of of Cut No. Shcr~ ........ Sitoin Odor % lnten. Color , Cut . Fluor, 1.0,486 ~tain, where noted is very IiRht tan 3 3 2 2 YG 2 2 10,487.5 3 3 2 2 YG 1.5 1.5 10,488 ' 0 0 0 O ' O O 10,491 alternate l~yer8 of sand with no shows amd sand wit! light t~n ~in~n~ & fluor 1.6~ 1.6a 2 2 Y 1.2 1 t0,494 3 3 :2 2 YG 1.5 ..... 2.' 10,497 0 0 0 0 0 0 ~.. z,o? 5 ~ q 2 2 ¥ 1.7 ltq, .... ,, , 10,500 0 0 0 0 0 0 10,503 3 3 2 2 ¥ 1.5 1 , , , , , , , ¢~Lith. Symbol, % sand' C,0-5%; 1,5-30%;Z, :50-65%;:5,65-85%; S,85-100%. ~See Legend for Oil Shows (over) COMPL. DATE ................ .... SHELL OIL COMPANY WELL ........'~..:..~....~'../. ' · ..... FIFLD ........... : ...................................... / · C.! ........ ~ i ' ~ ' ' ' r ...... '~ ' j -- ' .... I ! ' ' / ' : / ' """" ' ,,f z ~ ~o + oo z'-:,,l~. 4-zq, ,9 z,,..,,~ ,.v ff..s' ,~':" I,.zf7 /, ,e7 , : . Ss,...'~.:..',(... L:~:,o.,:.. ! ,,,,'",. '~' ,._ L..-],'""' ~.~-,~C" ,~,~<.'G..., 11 '~. ,Z'V: ',v' s~, b: / ? o z,~-~ ~ :.~,sz ~,,:~,.t,,/ -'r / /, , '".......~ '"' ! ..... .l" "':"'"'. '~. :,~ I i i .... ' '- . .... ~ ' ...... ,.. . ...... ' ..... : ' 'i , 41 . ~ ~r .......... I .......... '--: ............. I : :.? -.. : ....,-,: ...,. ,, '. ~,-....., ~,.. ! ~ ,r.. :.,v !..:, ,~ .. ~,o: ',,., · '. . , ,-/,'..,,';,o '-,~o ' _,._ _ .,, :, .,,..~,,,.... ....,.,,,.. , .... _ .. ?? , ~ ,, . ,~ · ." / '-'" ..-.> ":' // '"' ' . .'"'.~..-"'( .... 'I . '.. . , .."- ' "" ~ . . - i " ~. ! ...... ' ,_7 ...... ' ',, , - , , i ..... ._ , '~ " ~'~] o 0 ,.. ~ ,: Z ' ".,. ." .. i ' i ...... '.'I .. - i ...... [.: . ~ ~ ,~.g !,,~ u.,, : i~ "'- , , ? . , .... ;,- ,. , , , ~ ' .., . ~. .-~.,~ tLP [J / ~ '~ L - · ~ f ~t , . '. ' , ! , ~ ..... t ............... - ' /r>~z: ~ 4' .~--: ':"-~ :' '-' ' ...... . · ;,~.,7?~Z$ff ,~'f.~ A/ 3~t ~- ~.fo ;..,;.,fir/ _/!,~,z7 t~¥,')~ ...... '" ~ , _ , . .,',:/-'.', / ?'~ 3Z ,,,."D l:F,Z:,_".ck',:[,'~z,,.%,..x'£': ?",'~':f.I/ 3J'5 /: ~11 [3,~.7 :,F'/,,"/~ ..... · ...:', ..... ~ - J ~' .. , , ~ ' t~'V z 17 :::,_. .?~ t~,-l.?o ,.747,< !i1~?,~,7 ...v' 3/ £ ./,.,~,~!,, ~,~.~t .~.:~-~-.~1 ~'~/,TZ_!' .'~ ,2 ',z't . -" ~ , , , . . 1 -, ..... '- z:' z,o,)'.t :o,.:, ~ ,:,,'iF.,.,,'.. ;,' J /? o ,,r, v 7 i -/[,, ':?,:,.9'o,",~z.. .4... ,, Z >,./.. ./,:., ~ ,,/. 9...3 , ,, ,..' Z? r';,a e.., . ,,= . .... , ~ .. l " .'/ I .,,,o ; --/.,,,i/ zoo. ~_ ? /s- i75, z¥ /~.z ?..6 ff..c: // /,,: :--- 7~..~ ~7.~z.- ~ :/z,// ,, , ,, , ,, ,.'-',::,1,) i'~","Z c :.~ :,t ."'.,e'-.s'.F-' ,~.:,,. ,,.,,. r ',," :! 12 ~ 3 :. : j · ' ; I ' ' .... ' ' '' ':l ....... i " " ........ { ~ " ': i ~ "' ' ...... ,.,, I _ i ,.', t l I. , II !' ,,.tI ,, , . .,., CO:,'~PUTED ~,Y ,../. p .,4.;, I' . C~ECr, ED BY _ · H,, ...... , , ........ ~ ..... . ....... ,,~ ! ~ ~ .1~ ,,, : ' ' ' ''' ...... .. .- .]-~mm-:---~:- '.ELEv, .[..' ~. ~', SPUD 'DATE.....z'.7./.?..'...7...?'. .... COMPL. DATE .................... SHELL OIL COMPANY WELL .... ~......z. ~..-,.. / ........ : ........... Fl ELD ,./..¢..~f~..~....~.C..°. ~. ~..d....-~..~?. ~,~. ~:o~..,~,,~.,o~ v~,,~o, w~,,~o, ',.~.°.~,o, ~?~ ~T~ ~ ~ co-o~ ..... ~'~~,~,o~~'~"°~ v.~,c~~°~ .~ _ ~ _ ,,,, .... , ,,,, J ,. ,,, ~ . I .' "~ ~ , ...... - ,, '~' , ,, ...... ~ ....... ~' '2 ................... 3~/ S~ 7 o ,,., ,, _ ~ t /~: ~. ' ....... ,,, ,,- ~g~/~.../..~3~o ~/rT,~7 :~,~) ~,~7 ~ g? ~ ¢~'~ ~'~ ..... t~5~Z*'~ zt~ ~ 220 ~. " ....... " ~[. :.~L-~ 2 ~'7 ~5' ':.a /7,%¢6 ~lf,l. fq ,',5,'o! Id ~'['7 ~' 7z,¢7 /~,/c ~..,~?. ' ' C,l,i ~ " . CC''~' '*F CHECKED ~_.: :.. _ '!. / 'SPUD DATE. ..~'..'../.~. :.7. .~.. .... COMPL. DATE: .................... w , SHELL OIL COMPANY wELL ...,,f.~...:.....,.Z...z./. -/' . F1 ELD.../..4.:~?.~ .... ~5..q."....'::.J....~.~.(.. , , Mecsu,e~ ,Ve:s,,rcd ~c~,n,:.~io~ Verticol Vertico~ ,orlzontaI Bb NG ~AI1TUDES ~PARTUR~S 'CO-ORDINATES D,s~cnce'-VERTICAL Oisfonce N S. I W. N. S. ~.~ W.' . , , " ,.- ' ........ . "' b~o ,~q 3z - /~q,[3 5'Tqb, Ty ., . ~,' /;3 - , , , ,. , , , ....... _ ~ . , ~"'~ ~'' ' I ' ' , , ~'; - .......... , , , -.,~o--/z,~.S 1~ ~ ...~b 7: ...... ,~.~,z~ '..,~q,'.79 u~.,~t ~ /~, ~" 0o70, ~',ql~ .,z~5,~u, .'~f'~/~z"~ .... ' ,,, '.:',';',' 7~ z-~ ~: 7467 7zzo,j'l 3o, 7q ~ 1~ Z' z?,6o ~,l/.~~ z7~7,2~] .~oo,~ ! ...~ ' ,, ,, , . , ,~ .<5:3 ~z...~7 - ;:<.~ 777'ts'/.24 ,I/77 .d i¢ W ./,35 ~ /o./i ~.~,~., - . ~'~.~ / ~. 7 27 .~ o ,' / ~ , ~, ~' ,, _ ~'~ / 2! ~c, ,~'-~" ':7/,9:;~77F/.4f ;-~,',~/~ ~ ~7 ;q,~' 3'.~ ~,'t,t.~? .~::,~,,~'.. , _ , ~ 77. ,. ' ' COMPUTED ......... _ ..... , ,,, . -.- ,u , .! 1 , SHELL OIL COMPANY wELL ..... ~..':..~.~...'C./.. ..... . . / . Fi E L D ...../~.,.:.~..r../.'[ F....r/~..:.e.~.~/....~ ~ / Mecsured Measured lnchnotion Vertical Vertical [i'~orlzont~'l! ..... ! ............... i . I .... BEARING LATITUDES DEPARTURES. CO-ORDINATES Depth Station FROM Station Depth I: 12eVlQtlon OF .......... ~. ........... D,sia'nce VERTICAL Distance [i DEVIATION N $. E. W. I N. $. E., W.. ,,, ,,,, ...................... ,, , _ , , ,, ~ · - ~ , '" , ... , ,, , , . . ,, ,, ~ ~ - __ COMPUTED BY X~..~'D r~ CHECKED BY SHELL OIL COMPANY SHELL BUILDING 1008 WEST SIXTH STREET LOS ANGELES, CALIFORNIA 90017 AP R 2~:'"'~ i9 7 4 State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchor. age, Alaska 99501 i t c. ~~ I I1 I ~ ~;'~°L' ! ~ I 3 ,i--,~v .... f- l DRAFT J I s~c I CONFER: FILE: i i. ,. ,1 Gentlemen' Attached are two copies of the Monthly Report of Operations for our Shell-Atlantic-Standard'Middle Ground Shoal 'A-24-01 well. This report is for the month of April, 1974. Very truly yours, JDM: TB N. G. McKim Division OPerations Engineer Attachment ~,.~Y ! I974 l~w~ No, REV. 3-1-70 STATE oF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS SUBMIT l~N DUPLICA~ NAME OF OPERATOR Shell Oil COmpany 3. ADDRESS OF OPE~U~X)R .... 1008 West Sixth Street, Los Anqeles,.California '4. LOCATION OF WELL Conductor 28, Leg 4 at 63.45' S and 56.79' E from center Leg 1 at 1627' N and 435' W from SE corner Section 11, T.8N., R.13W., S.M. ~: AP! I~U~ERICAL CODE 50-133- 20258 LEASE DESIGNATION AND SERIAL NO. ADL 18754 ? IF INDIAN, ALOTTEE O]~ TRIBE NAME None 8. L~'IT FARA~ OR LEASE NAME Middle Ground Shoal 9 WELJ...~o MGS A- 24-1 - i0 FLF. LD AND POOL, OR WILDCAT g Pool: Middle Ground Shoal 11 SEC , T., R., I%{. (BO'I'POI~ HOI2~ OBJECrFO~ l, T.8N., R.13W., S.M. 12. PERMIT NO 73-38 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE. CASING AND C~WiENT~NG JOBS INCLUDING DEPT~ SET ~ VOL~ US~. P~O'~TIONS. ~TS ~ ~SULTS FISHING JO~ J~K ~ HO~ AND SIDE-~CKED HO~ ~D ~Y O~R SIGNIFIC~T ~~ ~ HO~ ~ITIONS Report ~for APri 1, 1974 Drilled 9-7/8" hole to 10,410' Core #1, 10,410-10,468', recovered 58' Core #2, 10,468-10,486', recovered 17' Core #3, 10,486-10,523', recovered 22.5' Drilled 9-7/8" hole to 10,900' Ran Logs: Dual induction - laterolog, bOrehOle compensated sonic, Gamma Ray - compensated dens i ty. Cemented 7" ~29# N-80 Buttress. casing at 10,888' with 2100 s~ks API Class G cement. Ran Gamma Ray - Cement bond - collar-logs, temperature surveys. Ran 3-1/2" tubi.ng to 9894', set packer at 9840' Perforated one hole/ft 10,515-10,524' Perforated one hole/two feet at 10,434-10,464'. Placed well on gas lift. Released rig 4-22-74. Ig74 BtVISION' Oi;' OIL Ai'{D C-AS sm~ ~ Biv~nn Op~a~nn~ Engineer D~TE NOTE --Report on ~is fora is required for ea~ OOlendar ~ths regardless of the status of operations, and musf ~ flied ~m oil Grid gas conservatbn commiflee by the 15~ of the suQc~ding ~n~, ~le~ Otherwise directed. SHELL OIL COMPANY 601 W. 5TH AVENUE, SUITE 810 ANCHORAGE, ALASKA 99501 April 9, 1974 State of Alaska Divislon of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: Attached are two copies of the Monthly Report of Operations for our Shell-Atlantic-Standard Middle Ground Shoal A-24-01 well. This report is for the month of March, 1974. Very truly yours, F~'~ DN~v?;i%K~;erations Engineer Attachment Atlantic Richfield Company w/attachments Standard Oil Company of California w/attachments U.S.G.S. w/attachments APR !, 0 ~;A~ ANCHORA6B No. ~---4 3- 1-70 STATE O, .ALASKA OIL AND GAS CONSERVATION COMMITrEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WgLL '& 'NA/~E OF OPEI~.ATOR OTHER SUBMIT l~ DLrPLICAT~ SHELL OIL COMPANY 3. ADDRESS ~' O~ERAT~)R ........ 1008 WEST SIXTH STREET, LOS ANGELES~ CALIFORNIA '4 LOCATI'~N OF WI~-T:-L Conductor 28, Leg 4 @ 63.45'S and 56.79'E from Center Leg I @ 1627'N and 435'W from SE corner Section ll, T8N, RiSW, SM. APl NUiVIEHICAL CODE 50-133-20258 6 LEASE DESIGNATION AND SERIAL NO. ADL 18754 ~ IF INDIA]~', ALOT1-EE O]~ TRIBE NAME NONE 8. L~.'IT FARA'I OR LEASE NAME MIDDLE GROUND SHOAL ~ WELL NO MGS A-24-1 10 FLELD AND POOL, OR WILDCAT G POOL, MIDDLE GROUND SHOAL SEC. T., m.. M. (BOTTO~t HOLE 1, T8N, R13W, SM I,. ~'~T Nd. ' 73-38 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA~NGF_.S IN HOLE SIZE, CASING AND CK1ViENT!NG JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND iTESULTS FISHING JOB~ JUNK IN HOLE AND S1DE.'YP~CKED HOLE A2~D A.NY OTHER SIGNIFICANT CH4%~ES IN HOL~ CONDITIONS REPORT FOR MIDDLE GROUND SHOAL A-24-1 WELL FOR MARCH,. .19.7_4 Ran Wash over pipe, recovered fish. Directionally drilled to 10,062'. Ran Schlumberger Dual Induction Laterolog, run l, 10,026~' - 2,008'. . , ~)j~ ~-~'~~,/~,~ ~,.,/~.c/~2//,~ =rnm Division Operatioq~En~r_.m~ . April 9,..%.974 V , -. , ' ' ', ' N0 -- e~or on t is arm is required or ee~ Gelender ~th% regardless of the status of operations, on4 ~uS~ ~ flied in dupli~te with the oil and gas conservatbn commiflee bythe 15~ of the suQc~ing mn~, ~le~ Otherwiee directed. State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention Homer L. Burrell Gentlemen: SHELL OIL COMPANY ,SHELL BUILDING 1008 WEST ,SIXTH STREET LOS ANGELES, CALIFORNIA 90017 h~AR 1 1 TELEPHONE: 482'3131 Ic. ---'[ ' 3 GFOL I ~v I CONFER: FILE: Attached are two copies of the Monthly Report of Drilling Operations (Form P-4) for February 1974, of our drilli.ng Shell-Atlantic-Standard, Middle Ground Shoal A-24-1 well. Yours very truly, JDM:TB N. G. McKim Division Operations Engineer West Coast Operations Office Attachments cc - Atlantic Richfield Company (w/attachment) - Standard Oil Company of California (w/attachment) - Amoco Production Company (w/attachment) - United States Geologic Survey (w/attachment) ~AR 1 5 i974 ,STATE OF~ ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS I._. · ~gLL WELL 2. NAME OF OPE~-ATOR OTHER qh~l l n.; 1 Cnmn.qn~, 3.-ADDRESS- OF- OP]~A[%"O~ '~ SUBMIT IN DUPLICATE APl NUMEPACAL CODE 50- ] 33- 20258 6 LEASE DESIGNATION A%'D S'EI~tAL NO. ADL 18754 IF INDIA]~, ALOTTEE O1~ TRIBE NAME None 8. L,~IT FARM OR LEASE NAME Middle Ground Shoal 9 WELL NO 1008 WeSt Sixth Street, Los A.nqeles, California MGS A-24-1 4. I~CATiON OF WELL i0 FLELD AAID POOL. OR WILDCAT Conductor 28, LeD 4 at 63.45' S and 56.79' E from center ~_ M.a..~.. G Pool I'~ SEC, T., i~., M. (HOT'TOM HOLE Leg 1 at 1627' N and 435' W from SE corner Section Il, o~ T,8N., R.13W., S.M. 1 , T.8N.: .R. 13W. 12. PEP, MIT N'O 73-38 13, REPORT TOTAL DEPTH AT END OF MONTH, CHAXG~ IN HOLE SIZE, CASING AND CL'MENTING JOBS INCLUDING DEPTH SET AND VOLU1VIES USED. PFA~OHATIOlqS, TESTS ANT) RESULTS FISHING JOBS JUNK LN HOLE AND SIDE-TR,ACKED HOLE A,1NTD A~IY OTHER SIGNIFICAiqT CItAHGES IN HOL~ CONDITIONS Spudded 7-30 a'm. 2-15-.74, DirectiOnally drilled 17-1/2" to 2011'. Ran 2010' of 13-3/8" 61# K-55 buttress casing, fillup collar at 1973'. Cemented with 2550 cU ft API Class G' Opened DV collar, cemented with 900 cu ft API Class G. Cemented annulus frOm top, with 125 sacks API Class G. Flanged up BOPE. Tested casi.ng, rams and Hydril to 1500 psi. Directionally drilled 9-7/8" hole. Dynadril stuck at 3749', unable to work free. Backed off at 1987'. Washed over and recovered fish to 3177'. MAR ! 5 1974 sz~mm TZT~ ~no_r'a T.i cm~q Fnoi rlo_~r , , ~ · _ Ill II Il I I 1! ,m .11 1. .1 ! 111 Ill i,i i ii i. NoTE --Report off this form is recluired for '-eaCh calendar month~ regardless of the status of operation~; a~d m~st i>o filed in dupli~te with the oil and got coneervatlon committee bythe ISth of the suoceediflg month, mlle~ otherwise directed. December 21, 1973 Re = M I dd le Ground Shoat A-24-1 She l I Ol I Company, Operator Permit No. 73-38 Mr. M. G. Mci(la She I I OII Company Shel I Bu] Idlng P. O. Box 3397 Los Angel es, Ca I I fornl a 90051 Dear Slr: Encl. osed Is the approved application for pere!t te drill ~ abeve referer~ed well In December 1973 from ~ Middle Ground Shoal "A" Platform. ~ell saaples, core chips end a cud log are no~ requlred. A dlre~at survey Is required. Pot lu*lon of any waters of the State ts prohlbl~ by AS 46, ~p?er 03, Article 7 and the regulations proautgatefl ttmreunde~ (Title t8, Alaska Ada~lnlstratlve Code, Chapter 70) and by the Federal 1dater laollu~i~ Ceatrol Act, as aaended. Prior to ceaaenclng operations ~fou =ay be ~tac1~ by a ~attve of the In the event of suspension ~r abaadoa~ent pta.se give this office adequate advance notification so that ~ cay t"mve a wl~ma$$. presamt. Very truly yours, Thoaas R. Marsha I I, J r. Executl ye Secretary Alaska 011 and Gas Conservation Enc I osure cc: Departeent of Fish and gaee, Habltat Sectloa w/o eric!. Department of Envl ronmenta I Co~s~rvatlor~ ~to eec:t. Porto I0'-- 401 , I~'V. I-l--71 SUBMIT IN TRIP (Other lnstr~etton~/ reverse side) STATE O,F ALASKA OIL AND GAS CONSERVA,TIO'N ,C.OMMITTEE PERMIT TO DRILL OR DEEPEN DRILL I~l DEEPEN J--J APl #50-133-20258 $. 6.LF_~SE DI/~IGNATION AND S~RIAL NO. ADL 18754 IF lIN'DIAN, AI~O~ OR TRIBE NA1VLE 2. NAME OF OPeRaTOR Shell 0il Company 3. ADDRF. SS O~ OPEI%ATOR 1008 West Sixth Street, Los Ange,les~ California , 4. LOCATION OF WELL At surface See below* At proposed prod. zone See below** 13. DISTANCE IN MILES AND DIRECTION F~OM NEAREST TOWN OR POST OFFICE* 17 miles NW of Kenai~ Alaska 14, BOND INFO~MA~IQN: Sta,~ew~ae 0il TYPE and Gas Suretyand/orNo. TIC 136503 15. DISTANCE FHOM PROPOSED* LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also tO nearest drig, unit, ifany) - u 280 _ 18. DISTANCE PROM PROPOSED LOCATION' TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 1050+' 21~ ELEVATIONS {Show whether DP, RT, CR, ete.~ 16. NO. OF ACRES IN LEASE 3746 Ii~. PROPOSm DEP~ 10~700' 11}' D.F. ,,, 23, PROPOSED CASING AND CEMENTING PROGRAM None 8. UNIT, FARM OR LEASE NACRE Middle Ground Shoal ~, WELL NO, A-24-1 I0. FIELD AND POOL. OR WILDCAT Middle Ground Shoal Il. SEC. T.. R.. i~T.. (BOTTOM HOLE OBJECTIVE) 12. 1, T.8N., R.13W. ,.~o--, $100,000 17. NO, ACRES ASSIGNED TO THiS WELL 40 20. ROTARY OR CABLE TOOLS Re t ary 22. APPROX. DATE WORK WILL START* December 15 ~ 1973 , , SIZE OF HOLE SIZE OF CASING:, WEIGHT PER FOOT l GRADrE SETTING DEPTH quantify of cement 17-1/2" 13-3/8" 61# J-55 2,500+' _ 2.,550 cu.ft. 8-3/4" 7" 29# N-80 10,700+' 1,200 cu. ft. *Surface: Conductor 28, Leg 4 at 63.45' S and 56.79' E from center Leg 1 at 1627' N and .435' W from SE corner Section 11, T.8N., R.13W., S.M. **Top of Production Zone: 2000+' East from SW corner, Section 1, T8N., R.13W., S.M. (est. 4393' N 33° 45' E from surface.) gOT 7; 973 ~ ABOVE SPACE D~SCI~IBE I~ROI~OSED P~R~: Ii ~1 Is to dee~n 'give ~ on present p~u~lve zone ~d pro~ ~w preclusive ~ne. ~.~l ls ~ arlll 0r a~n d~ec%to~lty, give Pe~ent. ~' on s~bsu~a~ ~t~ ~d me d.' ~.' ~ ye.ica, dept, Give bio. ut '~e(e~ter-.~,~am. ~¥~1~. ~ ~t t~.~ 24, I hereby certify that the Foregoing Is ~e ~, Corre~ D~~t{~, STGN~~~//~.._ . DA= -/~ ~. _? ~= ~erat_ ions Engineer (This space /or State office use) CONDITIONS OF APPROVAL, IF ANY: J MU,D LO'C; OTHER HEQU~S: [] YES ~[[ NO A.P.I. 1N'IIMER,IC~ COD~ ~EE TRANSMITTAL LETTER SAMPLES AND CORE CHIPS R.F_,~IJ'I.JJ,JIO DII~EC~IONA3~ SURVEY RE~ ~ YES ~ NO P~[RM~'F NO AJ~PP~:)VAL DA~'~J December 21, ! 97 3 .P~o~]~~ ~ ~~ ~A ~. Executive Secre~ar_y~.~ December 21, In--ohs ~ Revere Side --I 1973 SHELL OIL COMPANY SHELL BUILDING 1008 WEST SIXTH STREET LOS ANGELES, CALIFORNIA 90017 October 26, 1973 TELEPHONE: 482-3131 State of Alaska Division'of Oil.and'Gas · .3001. Porcupine'Drive Anchorage,'Alaska 99501 .Attention: 'Mr. Homer :L. :Burrell Gentlemen: .October"26, ;I973: c. GEOL C. ENG --- 1 ENG 2 ENG J 3 ENG 4 ENG 1 G'EOL 2 GEOL 3 GEOL ~ __ DRAFT s~c CONFER: FILE: . Attached. is · the. reqUest,' in' triplicate' to · drill Middle 'Ground. Shoal A-24'1. well. ' . InclUded" are the. following: 1..'Proposed Work Sheet'' 2.. Target'Map 3 Location Plat 4. $100 Filing.Fee.CheCk. .yours..verY'truly, , N. 'G: 'McKim Division Operations . Engineer .West Coast Division JDM:md AttaChments cc: w/attachments .Atlantic Richfield.Company .Standard Oil Company.of-California 'Amoco'Production Company U,S,G.S. OCT 9 1973 ORIGINAL DRILLING WORK SHEET SAS-MGS A- 24-1 MIDDLE GROUND SHOAL FIELD: ALASKA Surface Location: Conductor 28, Leg 4, Platform A. Conductor 28 at 63.45' S and 56.79' E from center Leg 1 at 1627' N and 435' W from SE corner Section 11, T.8N., R.13W., S.M. Targets: (1) 200' dim.. 4393', N 33° 45' E from surface at 8545' V.D. (2) 200' dia 4900' N 33° 45' E from surface at 9245' V.D Elevatiom: D.F. 116' (above MLLW) Well Depth: 10,700'+ M.D.; 9418'+ T.V.D. Casing Program: 2500+' 13-3/8'' 10,700+' 7" P. rpKram: 1. Move rig over 24" Conductor 28, Leg 4. Flange up 24" riser with pitcher nipple. Hook up flow and fill lines. 2. Run in with 17-1/2" bit and clean out to just below shoe at 317'. Run 17-1/2" bit on dyna-drill and kick out from leg to clear platform and surrounding wells. 3. After clearing all wells drill in direction as indicated on Target Map. Build angle at 3°/100' to 30°. Use 18' monel and 25' monel in tandem for proper survey response. Drill 17-1/2" hole to 2500+'. . 4. Run 2500'+ of 13-3/8", 61#, J-55 Buttress thread casing equipped with plain cement guide shoe on bottom and flexiflow fill-up collar one joint above shoe. Pipelock bottom five joints with Shell Epon Adhesive VI. Cement with 2350 cuft API Class G cement premixed with bentonite (96 pcf slurry), followed by 200 cuft API Class q. neat ce- ment ('118 pcf slurry). Calculated cement volume is 307° over gauge hole. If cement does not return to surface, run macaroni down annulus and cement to surface' with API Class G neat cement. CasinR De si~n. Fact,o..rs Size Interval LenRth Wt. Grade Conn. Collapse Tension ~uYst~ _ 13-3/8" 0-2500+ ' 2500+' 61# J-55 Buttress 1.39 NA NA * Burst rating = 3090 psi" Page 1 of 3 O07 9 i973 ,Dr.illi.nK Work Sheet SAS-MGS A-24-1 Middle Ground Shofll Field~ Alask~ pro_~_r.am (Continued) Cement Volume Fill Cement Type ..~Cu F_t Excess Weight Yield (Psi/ft~ (Ft3/s_x)~ Mix Wa ter ,(Ft3/sx)_ To Sur-' "G" blended w/ 2350 (30% face 107o bentonite over gauge) ( Tail In API~."G" 200 .680 1.92 98 pcf .819 1 18 118 pcf 1.39 0.70 Notes: a. Casing capacity = 85.4 cuft per 100'. Casing displacement 2.22 bbls per 100'. b. Mix cement with sea water. c. Use pressure chart and densometer (if available). d. Maximum allowable casing pull = 600.000#. 5. Land casing in 24" hub and flange up 12" 3000 psi B.O.P.E. and riser stack consisting of double Shaffer gate and G. K. Hydril. Test riser, B.O.P.E., and casing to 1500 psi. 6. Drill 8-3/4" hole to total depth (10,700+') using lignosulfonate mud. Maintain less than 10cc water loss and 5000 ppm NaC1 below 6000'. Main- rain directional control as noted on attached Target Map. 7. Run logs: (1) SP-GR-DIL T.D. to surface casing (2) SP-BHC Sonic T.D. to 5000-+'. 8. Run 10,700+' of 7", 29~/, N-80, Buttress casing equipped with float shoe on bottom and flexiflow fill up collar two joints above shoe. Pipelock bottom ten joints with Shell Epon Adhesive VI. Centralize casing, as hole conditions permit, based upon log evaluation. Cas Size .Int, erva!_ ' 'Len~t.h Wt. Grade . Conn._ De.s ig~n Fajctors hollap, se* Tension .B..Ur, S_t 7" 0-10,700+' 10,700+' 29~/ N-80 Buttress 1.43 2.18 1 56 * Based upon 0.48 psi/ft formation gradient with casing evacuated. Page 2 of 3 ORIGINAL Drillin~ Work Sheet SAS-MGS A-24-1 Middle Ground Shoal Field~ Alaska ProKram (Continued) 9. Cement casing with an estimated 1200 cuft API Class "G" cement premixed with 1% Halad-9 and one lb per sack CFR-2, mixed with fresh water. Pre- flush with a minimum of 50 cuft fresh water. Cement Note: Actual cement volume to be 100% in excess over amount determined from caliper log to cement from T.D. to 6200±'. Volume Weight Yield Mix Water Fill Cement Type (Cu Ft). Excess (Psi/ft~ (Ft3/sx) (Ft3/sx) T.D. to "G" blended w/ Est. 1200 100% .819 6200+' 1% Halad-9 + (100% over (118 pcf) l#/sx CFR-2 gauge) 1.18 0.70 10. Run 6" bit, clean out to fill up collar. 11. Run Schlumberger Gamma Ray - Cement Bond - Collar Log, T.Do to 500±' above top of cement. 12. A completion work sheet will be issued based upon evaluation of logs. Los Angeles, California Page 3 of 3 APPROVED: DATE: RECOMMENDED: i973 BY .................................. DATE: .....................SUBJ£CT..~....~ .............................................. ~. .............. : ........... SHEET NO .................. OF ................ CHKD. BY .................. DATE ........: .......... ~.,~.. ~ ~ ~ ~ ~ ~~ . ,,, .~;~., ~, .... .~.~ ........................ :..~ ..... ~....~ ....... ~o,,o ......................................... . ....................................................... ,. ............................................................ ,..~,. ......... ~ ........... ~ ........ Z ..... " · ~//~ ~ . .. ~/ &-_.-..,.. ...: ........ -~ ,, .;,, ...... . _.....:.: ~ i/ ........ ~, ~,o. ~ ?'~o~...,~ ..................... ,: ..... ~ ....... ~: ........ IO,qo0 ND' 11 A-32-11 e A-42-11 12 A-11-12 T. 8 N., R.13 W,, S.M. · A-13-1 J · A-33-1 A-43-11 2'// Leg / 4 LOC~TTION OF COflDUCTOR 32, LEG # 4 A-14-1 2000' A- 25-1 -j' 'A- 24- I · A-23-12 ADL 18754 LOCATiOH..OF .PRJ)DUCJFIG - ZOflE WELL' A'24-1 PUBLIC LAND DESCRIPTION CONDUCTOR 32 LEG No 4 LOCATED 58.37'S AND 46.85'E FROM CENTER OF LEG No.l 2000'E FROM "THE SV~ COR. CENTER LEG No I LOCATED 1627' N AND OF SEC. 1 , T8N; RI3W, S.M. 435'W FROM THE SE COR. OF SEC. 11 TSN, R13W, S.M. IDRAWN I~Y: SCA~E: 1" 1 1 SHELL O L. COh" PANY:·Z21-6;7523 ' DATE:OCTOBER :24,1973 SHELL-ATLANTIC-STANDt~RD WELL 'A-24-1 IN SE~. 1t' - .15W., S.M. -. COOK. INLET - STATE OF ALAS[~A .... . company ,, . ~// ~;/~ .... --- _ Lease & Well No._ /~/~,s- ~,.-~:z' CHECK LIST FOR NEW WELL PERMITS Yes No Remarks , ,, Is well to be located in a defined pool ................. .//~ ~ __ _ .................... Do statewide rules apply ~ · · · m · · m · · · · · · · · · · · · · · · · · Is a registered survey plat attached .................. ~ ~ Is well located proper distance from property line ........... I~_)well located proper distance from other wells ............ Is sufficien~,undedi'Eated acreage available in this pool ........ . _ ~, Is well to be deviated ,,~ Is operator the only affected party ................... ~}t~- Can pem~it be approved before ten-day wait ...... ; ........ ~4~g~ ~ · Does operator have a bond i~n force ................... //~,~_ · Is 'conductor string provided ...................... · Is enougi~ cemeHt used to circulate on conductor and surface ...... -- Does BOPE have sufficien: pressure rating ...... .. dditional Requirements: · Will cement tie in surface and intermediate or production strings · W~ cement cover a.ll possible productive horizons .......... . Will surface casing cover all fresh water'zones ........... , W~11 surface csg. ~nCern~l burs¢ equ~l .5 ps~/f¢. ¢o nex~ s~r~ng . .W~11 all casing give ad. equaCe safe~ Jn collapse and tension , ,