HomeMy WebLinkAbout173-038PLUGGING & LOCATION CLEARANCE REPORT
State of Alaska .m~s~ 0IL & GAS CONSERVATION COMMISSION
PTD NO. ~-(g~8
Lease.~A ' L ~ ~
Memorandum To File: API No.
Well Name
Operator
Location
,~3Z - 2~ Z ~-8 -oo
Spud
TD: ld)!?(~(~ ,
Completed
Note casing size, wt, depth, cmt vol, & procedure.
Long Csg:
Liner:
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
/
Well head cut off:
Marker post or plate:
Location Clearance:
Conclusions:
Code
~ STATE OF ALASKA ~
~LASKA OIL AND GAS CONSERVATION COMMISSION
wELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Servic~ Well
2. Name of Operator '1~-- -,---
7, Permit Number
Shell Western E&P Inc. 73-38
3. A~ress (WCK 5231 s. AP~Number
P.O. BOx 576, Houston, TX 77001-0576 ~o- 733-20258
4. Location of well at surface '9. Unit or Lease Name
PLATF A, LEG 4, COND 28, 1564' FSL & 378' FEL Sll, TSN, R13W, S.H. HIDDLE GROUND SHOAL
At Top Producing Interval 10. Well Number
NA A24-01
At Total depth 11. Field and Pool
10,900' ND, 5743'N & 1910'E OF SE CORNER SEC. 11, T8N, R13N, SN
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. NIDDLE GROUND SHOAL
116' KBI ADL 18754
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or At)and 115. Water Depth, if offshoreI 16. No. of Completions
2-15-74 4-12-74 3-26-95I 80 feetaSLI' S]:NGLE
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVDl 19. DirectionalSurvey 120. Depth where SSSV set I 21. Thickness of Permafrost
10,900' ND; 9486'w~ 10,011' HD;$l'00'rv=' YES [] NOI~ I TRSCSSV (a 304' feetaolN/A
22. Type Eiectrlo or Other Logs Run
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
c0,o. 0 ...
7"29~ N-80 0 10,888' 9-7/8" 2100 SX - - -
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
Interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SiZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-MCF WATER-BBL OIL GRAVITy-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
R E E;VED
SEP 2 5 1995
^mska {JAI & (]as Cons. Commission
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80
CONTINUED ONREVERSE SIDE
- 49 -
- F~nMATION TESTS
' '~~ Include interval tested, pressure data, all fluids recovered and gravity, GOR,
NAME
MEAS, DEPTH TRUE VERT, DEPTH and time of each phase,
GH 9270' 8117'
, ,
GN 9283' ' 8128'
:
GO 9314' 8153'
GR 9663' 8438'
GS 9726' 8490'
HC 9965' 8691'
HD 10,098' 8801'
HE 10,109' 8812'
HF 10,134' 8833'
HI 10,186' 8877'
IlK 10,234' 8918'
HN 10,386' 9047'
31. LIST OF ATTACHMENTS
HORN[NG REPORTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
s.
/
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
-all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in
item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing
and the location of the cementing tool.
.
Item 27: Method of Operation: Flowing. Gas Lift. Rod Pump. Hydraulic Pump.. Submersible. Water
Injection. Gas Injection. Shut-in. Other-explain.
,.
Form 10-407'
SwEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11943
,D MIDDLE GROUND SHOAL PRESENT DEPTH
b~SE PLATFORM "A" FOOTAGE DRILLED
WELL A24-01LE SIZE OF LAST CSG 7.000
WORK ORDER 723530 DEP. OF LAST CSG 10888
SIDE TRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF DAY
NLTA LTH/YTD / EST. DAY
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 224
LAST BOP TEST 03/23/95 LAST CSG TEST
03/26/95
22
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: TIH WITH RTTS
/FREDERICK DA
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.50 CHANGE PIPE RAMS - STRAP AND CkLIPER MILL BHA ASSY
3.50 TEST BLIND RAMS AND PIPE RAMS - PERFORM ACCUMULATOR TIME TEST -
INSTALL WEAR RING AND LOCK DOWN
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED
PP2 @ KILL SPEED
1.50 MAKE UP BHA - WINDOW MILL, CASING SCRAPER, WATERMELON MILL, BS WITH
FLOAT, 6 DC'S, UP JARS, DOWN JARS
7.50 RIH TO 10040' - FILL PIPE · 5500' - POOH 17 STANDS - PICK 51 JTS
3-1/2 DP
1.50 CIRCULATE WITH FIW - RETURNS TO INJECTION WELL VIA GAS BUSTER
1.50 CHECK FLOW - PUMP PILL
4.00 POOH WITH MILL 'AND SCRAPER ASSY - SLM
1.00 MAKE UP CIRCULATING VALVE AND RTTS
1.00 RIH WITH RTTS
NOTE: FIRE AJ~ARM @ 8:30 PM - FALSE ALARM - SMOKE DETECTOR ON 1ST FLOOR
ZONE 2 - WELL WAS SECURED IN ONE MINUTE - PERSONNEL REPORTED TO REC.
ROOM WITH AIR PACKS AND FLOAT SUITS - GOOD RESPONSE TIME.
TIME (HRS)
CUM. ROT. HRS
ROT AT I NG
MUD MOTOR
TRIPPING 12 . 50
C & C 3.00
REAM I NG
SURVEYS
JET
RE PAI RS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH 3.50
RUNNING, CASING
CEMENTING
PICkUP/LAY DOWN DS 2.50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUAT I ON
CORING
OTHERS 2.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A" PROG. DEPTH 11943
) MIDDLE GROUND SHOAL pRESENT DEPTH
L=_~E PLATFORM "A" FOOTAGE DRILLED
WELL A24-01LE SIZE OF LAST CSG 7.000
WORK ORDER 723530 DEP. OF LAST CSG 10888
SIDE TRACK WATER DEPTH 80
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF DAY
NLTA LTH/YTD / EST. DAY
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 225
LAST BOP TEST 03/23/95 LAST CSG TEST
03/27/95
5
22
DRILLING FOREMAN: WELLS R V
.
PRESENT ACTIVITY: SET WHIPSTOCK
/FREDERICK DA
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
3.50 FINISH TIH WITH RTTS ASSY
1.00 SET PACKER ~ TEST CASING TO 2000# FOR 30 MIN. - HELD OK
.50 CHECK FOR FLOW - PUMP DRY JOB
4.00 POOH WITH RTTS ASSY
4.50
1.00
BHA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED
PP2 ~ KILL SPEED
RIG UP SWS - HOLD SAFETY AND PROCEDURE MEETING - RIH WITH BAKER CIBP -
SET PLUG TOP ~ 10011' - POOH - RIG DOWN SWS '/'
MAKE UP WHIPSTOCK AND ORIENTING SUB
8.00 RIH WITH WHIPSTOCK ASSY TO 9878'
1.50 MAKE UP TOP DRIVE - BREAK CIRCULATION AND ORIENT WHIPSTOCK - SET
WHIPSTOCK - HANGER BOLT SHEARED ~ 8K
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 15.50
C & C 1.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS' 1.00
INSPECT'BHA '
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORTNG
RIG NAME PLATFORM "A"__ PROG. DEPTH
F)~'~ MIDDLE GROUND SHOAL PRESENT DEPTH
L PLATFORM "A# FOOTAGE DRILLED
UELL A24-O1LE SIZE OF LAST CSG
SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1
11943 ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF DAY 2
NLTA LTH/YTD / EST. DAY __~2~
7.000 LTA LTH/YTD ___/___ DAYS +/-
DAYS SINCE LAST LTA ~2_~2
LAST BOP TEST ~3/~/9~ LAST CSG TEST
BHA INSPECTION (CUM. ROT MRS)
PP1 @ KILL SPEED
PP2 @ KILL SPEED @
UORK ORDER 723530 DEP. OF LAST CSG- 10888
SIDE TRACK gATER DEPTH 80
DRILLING FOREMAN: gELLS R V__ /FREDERICK ~A
PRESENT ACTIVITY: JAR ON TUBING HANGER
SUMMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) :
4.00 TEST BOP'S
6.50 INSTALL DRIP PAN AROUND BELL NIPPLE - FINISH CLEANING UP IN SUB AROUND
HATCH COVERS AND DECK - BOLT DOgN AND SILICONE gEAR PLATE FOR 6" AUGER
AND INSTALL GUARDS - CUT HOLE IN HATCH COVER FOR MOUSE HOLE AND PATCH
HOLE FROM LAST gELL - MIX 90 BBLS 9.2 PPG FLUID AND FILL TRIP TANK
2.50 BACK OUT TUBING HANGER SET SCREgS - ATTEMPT TO UNSEAT HANGER - HANGER
gill NOT COME. LOOSE
2.00 PICK UP (3) 4-__3/_~# DC'S~_4._:.-~Z~" UP ~RS, 1 JT 3-~2" DP AND XO - MAKE
UP TO TUBING HANGER
9.00 JAR ON TUBING HANGER - PULL 175K TO 180K BEFORE JARS GO OFF - JAR 10
TIMES AND COOL OFF JARS gITH gATER - CONTINUE JARRING - BLEED OFF__
ANNULUS GAS AND MONITOR - CONTINUE JARRING
THANKS TO JOE ROSUELL AT HALLIBURTON - JOE IS GOING TO SAVE THE 300
BBL DIESEL TANK gE HAD OUT HERE FOR THE LAST gELL FOR US TO USE ON ,
THIS gELL. THIS gill SAVE AFL $$ THE COST OF A TANK CLEANING. EVERY
LITTLE BIT HELPSlll THANKS JOElll
SWEPI ALASKA DAILY DRILLING REPORT
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOUN /BOP/UH
TESTING BOP /UH
RUNNING CASING
CEMENTING
PICKUP/LAY OOUN DS
INSPECT BHA
RIG UP/TEAR DOUN
gAIT ON UEATHER/MAT
EVALUATION
CORING
OTHERS
PAGE 1 OF 1
4.00
20.00
RT~ NAME PLATFORM "A" PROG. DEPTH 11943
D MIDDLE GROUND SHOAL PRESENT DEPTH
L~SE PLATFORM "A" FOOTAGE DRILLED
WELL A24-01LE SIZE OF LAST CSG 7.000
WORK ORDER 723530 DEP. OF LAST CSG 10888
SIDE TRACK WATER DEPTH 80
DRILLING FOREMAN: WELLS R V /FREDERICK DA
PRESENT ACTIVITY: CHANGE PIPE RAMS
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.00 CONTINUE JARRING ON TUBING I-rANGER
.50 LAYDOWN HWDP AND JARS - MAKE UP HWDP AND BUMPER SUB
1.50 JAR UP ON TUBING HANGER WITH MECHANICAL BUMPER SUB ASSY
ELEVAT. KB TO MSL 116.0 DATE 03/25/95
DIST. KB TO BHF DAY 3
NLTA LTH/YTD / EST. DAY 22
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 223
LAST BOP TEST 03/23/95 LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PPi ~ KILL SPEED ~
PP2 ~ KILL SPEED ~
1.00 LAY DOWN BUMPER SUB - MAKE UP X-O, 1JT HWDP, FISHING JARS, 1 4-3/4 DC,
ACCELERATOR, 1JT HWDP
.50 JAR ON HANGER - HANGER CAME LOOSE ON SECOND HIT
1.00 LAY DOWN ASSY - FILL ANNULUS
.50 PULL ON 2-7/8 TUBING AND RELEASE PRODUCTION PACKER
3.00 CLOSE PIPE RAMS - CIRCULATE FIW ~ 1-2 BPM - RETURNS TO PRODUCTION
HEADER
4.00 OPEN WELL UP - STILL OIL AND GAS RETURNS - CIRCULATE FIW WITH RETURNS
TO INJECTION WELL VIA GAS BUSTER - CHECK FLOW - PUMP 9.0 PPG PILL
10.50 POOH - LAY DOWN PRODUCTION STRING
.50 CLEAN RIG FLOOR - CHANGE PIPE RAMS TO 3-1/2
TIME (HRS)
CUM. ROT. HRS
ROTAT I NG
MUD MOTOR
TRIPPING 10.50
C & C 7.00
REAM I NG
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT I NG
PICKUP/LAY DOWN DS 2 . 50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUAT I ON
CORING -
OTHERS 4.00
SWEPI ALASKA DAILY DRILLING REPORT
RT~ NAME PLATFORM "A" PROG. DEPTH 11943
? MIDDLE GROU1N-D SHOAL PRESENT DEPTH
LEASE PLATFORM "A" FOOTAGE DRILLED
WELL A24-01LE SIZE OF LAST CSG 7.000
WORK ORDER 723530 DEP. OF LAST CSG 10888
SIDE TRACK WATER DEPTH 80
PAGE 1 OF 1
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: RIGGING UP
/FREDERICK DA
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF DAY
NLTA LTH/YTD / EST. DAY
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 220
LAST BOP TEST 03/22/95 LAST CSG TEST
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.00 RIG SECLIRED FOR AIT BBQ
18.00
_
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED ®
PP2 ® KILL SPEED
BLEED DOWN GAS FROM INJECTION LINE AND REMOVE FROM ANNULUS VALVE -
MAKE UP CIRC. LINES AND PUMP FIW DOWN ANNULUS - LET TBG FLOW TO PROD.
HEADER AND MONITOR WHILE RIGGING UP - PREPARE RIG TO SKID EAST -
CHANGE HATCH COVERS ON SUB DECK - CENTER RIG OVER A24-01LE - SET
STAIRS AND H]kND RAILS - CLEkN PITS - REPAIR VALVES ON SUCTION LINE -
SET PIPE RACK AND CAT WALKS IN PLACE - INSTALL SHOCK HOSE
NOTE:. THANKS TO ALL AIT Fu~NAGEMENT FOR APPROVING THE BBQ - EVERYONE
HAD AN GREAT TIME. SPECIAL THANKS TO RICK CASHION ~ HIS WEATHERFORD
FOLKS FOR ~LL THE LONG HOURS AND HARD WORK THEY PUT INTO "MAKING IT
HAPPEN". EVERYONE THAT WAS THERE IS MOST APPRECIATIVE!!!!
SWEPI ALASKA DAILY DRILLING REPORT
03/22/95
22
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH __
TESTING BOP /WH
RUNNIN~ CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN 18.00
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 6.00
PAGE 1 OF 1
Rig NAME PLATFORM "A' PROG. DEPTH 11943 ELEVAT. KB TO MSL
) MIDDLE GROUND SHOAL PRESENT DEPTH DIST. KB TO BHF
L~nSE PLATFORM "A' FOOTAGE DRILLED NLTA LTH/YTD
WELL A24-01LE SIZE OF LAST CSG 7.000 LTA LTH/YTD
WORK ORDER 723530 DEP. OF LAST CSG 10888 DAYS SINCE LAST LTA
SIDE TRACK WATER DEPTH 80 LAST BOP TEST
116.0 DATE
DAY
/ EST. DAY
/ DAYS +/-
221
LAST CSG TEST
o~/23/9s
22
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: PREPARE TO TEST BOP'S
/FREDERICK DA
BMA INSPECTION (CUM. ROT HRS)
PP1 ~ KILL SPEED
PP2 ~ KILL SPEED
S~Y OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 CLOSE SSSV AATD INSTALL BPV - HOLD SAFETY/PROCEDURE MEETING FOR NIPPLE
DOWN/UP - BLEED OFF i~NNULUS GAS TO PRODUCTION HEADER UNTIL LESS THAN
60 PSI THEN BLEED OFF TO ON-DECK TANK - REMOVE TREE ASSY - INSTALL
RISER - NIPPLE UP BOP'S - REFAB 4" AND 6" CHOKE LINES - C}{ANGE OUT
SUCTION VALVE IN MUD PIT - MAKE UP 4" DRAIN HOSE AND ROUTE TO SLOP
TANK IN WELL~F_2%D ROOM - FILL PITS WITH FIW - CHANGE SHA_KER SCREENS -
MODIFY BELL NIPPLE - PREPARE TO TEST BOP'S
NOTE: SPECIAL THANKS GOES OUT TO SCHLUMBERGER FOR ALLOWING EPOCH MUD
LOGGERS TO SET UP IN THEIR DOG HOUSE. THIS IS GOING TO SAVE A LOT OF
TIME, EFFORT AND $$$9- THANKS FOR BEING A PROACTIVE AIT MEMBER!!!
TIME (HRS)
CUM. ROT. HRS
ROTATING
MIlD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNrNING CA~ING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
24.00
August 22, 1995
Mr. Jeff Wahleither
Shell Western E&P Inc
P O Box 576
Houston, Tx. 77001-0576
RE: 73-0038 Middle Ground Shoal A24-01 Noncompliance P&A Report
Dear Mr. Wahleither:
A review conducted on our well files after May reported oil production
indicated the referenced well MGS A24-01 well Completion Report (10-
407), has not been forwarded to the Commission. I spoke with A1
Foglesong on June 21 and he would contact Houston office to forward this
report as required under 20 AAC 25.070(2).
Our regulations require the operator provide this report within thirty (30)
days after the well is P&A. The Commission request action on this matter
and correct this situation quickly to update our files.
Sincerely,
Steve McMains
Statistical Technician
· - : - .. · . · ... . .. :' ':. · . : . ' : ·
~1-i t '5 IJ'~TI ii '-:-i.¥].'- I;:~= ~g -=[i~-L~C:~~~~~~~:~:~d'~=-~. ',~ ~.-.=-~-:~='~ --- .... ' ~- - -:'-
. .-I- . . . . i .... -I-.... ': -I- Il -t- 1-t -I- ~ -I- ~ V
~:. ................. ' ................ I .... -I'. ....... 'J-. . .
[: ~ll ffl :ll di 'Ii :Ii :Ii ~ll ~i 'il ~li ~1: 'Ii ~1~ ~1:1: ~li ~li Tli ~1i :Il di¢: ~ll ~ll ~lJ ~lj Tll ~li Tll di ~li Tli ~ll Iii Tll $ ~I~ ~1~ Tll ill Tll ~ll ~ll di Tll ~li $ ~li ~li Tli Tli Tll ~li TIi Tli Tll ~li :Jl :ii TJi $ TJi Tti Tti ~Ji Tt: iii ~li Ttl ~ll T!i T{i ~ll ~li
I F'FI:;I-I I T
I !.-'I F,I LIIE D
/ /
-- -- - JI I Il j--Il ' I ' III
F'[II.'II..
I C[II)E
I
I-'::EN!U I I-",:[:':I'II~;I:IT B I Al=. i I
~i~1"1 I I"IIJD I BUR I L:JTH II'-.ILII'IFJI=I'~
_ ~_ _1 _ , · L, ·
BURl--ACE I_[ICAT.1.[II',I '1 BO'1'T[II'I I-I~IL_E
FEET I !) I I":EF'T I D I [-JE I Tt'JF:'
I I. I I. .I
_ _
I ELEVAT I OI,IB '
BI.lTlLgl.') I FEET I L]D
WEI_I_
IqtJI'IF.~ER
::
l::t,lBI I'1 I FEE'F I D I FEET I l) I I_-3E I 'T'I..IF'
LEASE · DE.i::"I'I'IS
FEET I'IUMBER I-ID I TVI)
I_OI',.I(.] l TUDE
DEB i I'11',11
·
I I .
I
I YRI
i ,',1
I I
t.ll.I ['I'1 l:-'ll_::O I I:il.ll:ll':'l:' I []I::II'.II:D
I.IO IAI'::,-'] I~'' -' :.
.:~1 .l[ll~:t-'_ I C,I II)E
I
LAT I TI.II)E
I.)E II I1,11 !-]EL]
-! t
I I -
FC.IL] rAGE
F:'EIF]' I 'YI'R I
Df:( I. I_LED
I'-' EE'I' Y I",:
,
AI:}'F
I.~RF'
.~!.:.
' F: Et~_'1' I (:] L)
I
~ MAR-l?-1995
06:48
SWEPI KENAI AK
Shell Western E&P Inc.
130 Trading Bay, Suite 310
Kenai, Alaska 99611
(90?) 283-30~
P.
Ma~h 16, 1995
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: SUBMISSION OF FORM 10-403 APPLICATION FOR. SUNDRY
APPROVAL TO ABANDON MrnDLE GROUND SHOAL WELL NO. A24-01.
Enclosed in triplicate is thc Application for Su_.ndry Approval, Form 10-403, to abandon
the "F" & "O" pools in MOS A24-01. This application supercedes the previously
approved Form 10-403 - Approval No. 95-018. Operations arc expected to begin March
20, 1995. fNot¢ that the "F" and "G" pools will be abandoned in A24-01 when the 5"
liner is cemented in A24-.01LE.)
If you. have any questions, please don't hesitate to call me at (907) 283-2509. Thank you!
Sincerely,
Alan Fo~le~ons
Senior Production Engineer
Enclosures
Alaska Oil & Gas Cons.
MAR-l?-l~95 06: 48 SWEP I KENA I AK
' I STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
P. 03
~h~11 W~~n F&P Thc_ , ....... ~~t~ ~K~
-- E~a~ __
130 Tradtng Bay, Ste 310 Kenat ~ 99611 ~__ Htdd~e 6round Shoal
4. LoMtt~ ~ ~i ~ ~Uda~
Leg4 Cond28 I564'N&378'W of SE cnr. $ec.11, TSN, R13H, SH
9663'RD:SI22'N&ZIZg'E of SE cnr. Sec.ll, T8N, RI3M, S~
IO,800'MD:5699'N&1935'E of SE cnr. Sec.ll, TSN, R13W, SH
IO,900'RD:$743'N&1910'E of SE cnr. Sec. 11, TSN, R13~, SR
& WM number
AU-O1
9. Pei~nit l~amb~
73-38.
lO, AF~ nLmmr
K- 733-tOtSS--O0
~1, ~t~
HGS 'F' & 'B' Pool
0,800 fo..t
9396 ,..t
~k(.-~,.,,,,~) 10,559' Underreame~ Ftsh
Length Size Cement~
370' 24"
2010' 13-3/8" 1300sx
10,888' 7", 29/ 2100sx
9663' - 10,534' (10 I~ERVALS)
370'
2010'
10.888'
Tubinl;I (M?.e, ~l'a4e, ~ i~t,I~1 (mpth)
2-7/8", 6.M, ~80 ~E 8~ e 9193'
;~ ~ ~v (~ ~ ~~ ~)
B~ "HB" PACKER e 9152', B~ER FV-6 TRSCSSV e 304'
II
True
370'
1832'
9472'
RECEIVED
Alaska Oil & ~as Cons.
PI~ i¢l~l'lty ~ Tea~ ~ L~,tI~I1 C~l'~llOe ........
~ Ifltl~dty Trot __ ~U~t tOrl~ required 1 O- ..._~.,..C~ ~
ORIGINAL SIGNED BY
RUSSELL A. DOUGLASS
Approved Copy
Returned
le '
This supercedes previously approved Form 10-403 -Approval No. 95-018.
MAR-l?-1995 06:49 SWEPI KENAI AK
x~ ,~..~
MIDDLE GROUND SHOAL No. A24-01
ABANDONMENT OF EXISTING HEMLQ.CK PERFORATIONS
Abandon the "F" and "O" Pool in A24-01 by setting and c~menting the 5" liner in
Plan
A24-01LE to 9200'.
ProCedure
1. Move to A24-01 (leg 4, conductor 28) and rig up.
2. Kill well.
3. Nipple up 5000 psi BOP stack and t~st.
4. Pull tubing and packer completion ~luipment.
5. GIH with bit and scraI~r and clean out to approximately 10,000'.
6. U~ witeliae and GR to set a flow-through whipstock at 9966' MD-KB and sidetrack.
7. Direciiorml drill to 11,943' MD-~ using a 6" hole. Final hole angle will be 70 d~gr~.~ in a S70E
dir~tion,
8. Log,
9. Run a 5" production liner to TD and hang off at 9200' MD.KB. Ccmcnt liner.
c :\ms0ffiCC\wiawotd~aogccLa2401pa. 403
mm--
SbJEPI KENAI AK
., MAR-l?-1995
.
·
,
06:50
P. 06
'ii
G t'o,J
TOTAL P.06
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Typeof Requ~t: Abandon 'X"&"p~:~.Suspend
Operation shutdown
Re-enter susp~ded well
After casing
Change approved program
2. Name of Operator
Shell Westet-n F~,P ];nc.
3. Address .
P.O. Box 576, Houston, TX
Repair well Plugging
Pull tubing
Time extension
Variance
77001-0576
Perforate
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
4. Location of well at surfa<3e
PLATF A, LEG 4, C0ND 28, 1564' FSL & 378' FI4L SEC. 11
At top of productive interval 'I"1~1~, l~,t~¢ ~ ~
9966' HD 5285' FSL & 2095' FI4L SEC. 11, T8N, R1314, Sl~
At effective dept~
10,800' HD, 5699' FSL & 1935' F~/L SEC. 11, T8N, R13~/, SR
At total depth
10,900' HD, 5743' FSL & 1910' F~/L SE(;. 11, TSN, R13~/, SH
Stimulate
Other
"6. DatUm elevation (I)F or KB)
116' DF feet
7. Unit or Property name
NIDDLE GROUND SHOAL
8. Well number
A24-01
9. Permit number
73-38
10. APl number
~0- 50-733-20258-00
11. Field/Pool
HGS "G" POOL
12. Present well condition summary
Total depth: measured 10,900 feet
true vertical 9482 feet
Effective depth: measured 10,800 feet
true vertical 9396 feet
Plugs (measured)
J~nk(measured) 10,569' UNDERREARER FISH
Casing Length Size Cemented
Structural
Conductor 370' 20"
surface 2010' 13-3/8") 6~~, 1300 SX
Intermediate k;-~$
Production 10,888' 7",29#,~v-so 2100 SX
Liner
Perforation depth: measured
9663'- 10,534' (10 INTERVALS)
Measured depth
370'
2010'
10,888'
True venial depth
370'
1832'
9472'
true vertical
Tubing (size. grade, and measured depth)
3-1/2", 9.3#, N-80 EUE 8RD 0 9888'
Gas Cons. C0mm'ts¢~
Packers and SSSV (type and measured depth)
GUIBERSON UNI-PKR VII @ 9846', BAKER FV-6 TRSCSSV e 304'
13. Attachments
Description summary of proposal X
Detailed operations program
sketch
14. Estimated date for commencing operation
2-20-95
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
~1 X Gas
Service
Suspended
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed (//-/~C~,..~/,),2~ ~'~ G. S. NADY Title .GR- ASSET AD. IN.
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ..... ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test ~ Subsequent form required 10- ~ O~
Date 1/19/95
[Appr oval No.?~.~-"
Approved by order of the Commission
original Signed By
Oavid W. Johnston
Approved Copy
~R/~c?med
Date c~//
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
MIDDLE GROUND SHOAL A24-01
ABANDONMENT OF EXISTING HEMLOCK PERFORATIONS
Plan
Abandon the "G" Pool by setting a cement plug
across the existing perforations.
Procedure
1. Move to A24-01 (leg 4, conductor 28) and rig up.
2. Kill well.
3. Nipple up 5,000 psi BOP stack and test.
4. Pull tubing and packer completion equipment.
5. GIH with bit and scraper and clean out to TD at
approximately 10,569'.
6. Set a cement plug across the Hemlock perforations from TD to
9,500'MD-KB.
7. GIH and clean out cement to 9,966'MD-KB.
8. Use wireline and GR to set a bridge plug at 9,966'MD-KB.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL~, GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ....
2. Name of Operator ~]'K~I~' 7. Permit Number
Shell Western E&P Inc. ~~,~i 73-38/94-047
3. Address ~ 8. APl Number
130 Trading Bay Suite 310 Kenai, AK 99611l.~ 50-733-20258-00
4. Location of well at surface ............ 9. Unit or Lease Name
Platform "A", Leg 4, Conductor 28, 1564'N &
Middle Ground Shoal
378'W of SE corner of Sec. 11, T8N, R13W, S M.
At Top Producing Interval ' 10. Weil Number
9663' (M.D.), 5122'N & 2129'E of SE corner of
A24-01
Section 11, T8N, R13W, S.M. "1
At Total Depth; 13W10R90O'S-.-M% '(M'D'/' 5743'N & 1910'E of SE corner 11.FieldandPool
of Section 11, T8N ,
,,
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. MGS/ "F" & "G" Pool
116' DFI ADL 18754
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. 15. Water Depth, if offshore 116' No. of Completions
2-15-74 4-12-74 4-22-74 / 3-31-94 feet MSL
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth whereSSSV set 21. Thickness of Permafrost
10,900 (9486) 10,559 (919Z) j YES [] NO []I 304 feet MD
22. Type Electric or Other Logs Run
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
13-3/8" 61# K-55 Surface 2010' 17-]/2" 1~0~ .qw Nnn~
. 7" 29# N-80 Surface 10888' 9-7/8" 2]00
I
, ,
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
interval, size and_number)
GR-GS 9663' - 9686' HN-HR 10390'-10475'
2-7/R" ~.$~ g 19':1 ' c) 1S2'
GR-GS 9686' _ 9720' HN_HR 10500'-10534'
HC-HD 9966' - 10026'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
HC-HD 10050' - 10091'
DEPTH INTERVAL (MD) AMOUNt-& KIND OF MATERIAL USED
HE-HF 10113' - 10133'
HI-HK 10187' - 10215'
HK-HN 10245' - 10295'
HK-HN 10306' - 10366'
27. PRODUCTION TEST
,.
Date First Production J Method of Operation (Flowing, gas lift, etc.)
03/31/94J Gas lift
Date'°f Test Hours Tested PRoDuCTION FOR OIL-BBL GAS-MCF wATER-BBL CHOKE SIZE IGAS-OIL RATIO
8/29/94 24 TEST PERIOD ~ 54 8,5 46 I PRJ .1 ~?A ....
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (c~r)' '
Press- 100 640 . 24.:HOUR RATE I~ 54 85 46 ..
28. CORE DATA
"' apparent presence gas water, chips.
Brief description of lithology, porosity, fractures, dips and of oil, or Submit core
ORIGINAL
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
29. 30.
GEOLOGIC MARKERS I-ORMATION TESTS.
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
,
31. LIST OF ATTACHMENTS
Morning reports, wellbore diagram
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
item 27' Method of Operation' F!o~Vingl Gas Lift,' Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
From: EP388TAR--VM35
To: ~P381~F--VM35 A A FO~,ESONG EP38DLM --VM35 D ' MARSHALL
From: TOM REESE
Subject: A24-01 ON 8-28-94. RETRIEVE PERF GUNS.
RIH WITH 2.25 OVERSHOT FISHING TOOL. GOT FRICTION HOLD OF PERF GUNS, BUT
COULD NOT STAY LATCHED ON. POOH TO CHECK TOOL.
RIH WITH 2.25 OVERSHOT FISHING TOOL. GOT FRICTION HOLD OF PERF GUNS AT
6532 (WLM) . COULD NOT STAY LATCHED ONTO PERF GUNS. HAD TO JAR DOWN SEVERAL
TIMES JUST TO GET FRICTION HOLD ON PERF GUNS. POOH TO CHECK TOOL.
HAD ABOUT 2" OF PERF GUNS. MUST BE EITHER BREAKING UP OR WADDING UP PERF
GUNS. RIG DOWN AND REGROUP.
LAST PRODUCTION TEST WAS AS FOLLOWS: GROSS 100; CUT 46; CLEAN 54; INJ 1042;
PROD 85; GOR 1574; TBG 100; CSG 640; SCP 16; H2S 13.
Date and time 08/29/94 09:53:59
END OF NOTE
- 1 -
13-3/8' SURFACE CASING at 2010'
61# K-66 CEMENTED w/
1300 ex 'G'
P ERffORATIONS.-
MGS A24-01
PRESENT STATUS - 9/26/94
GR-GS 9663' -9686'
GR-GS 9686' -9720'
HC-HD 9966' -10026'
HC-HD 10050' -10091'
HE-HF 10113' - 10133'
HI-HK 10187' - 10215'
HK-HN 10245' -10295'
HK-HN 10306' -10366'
HN-HR 10390' -10475'
HN-HR 10500' -10534'
7' PRODUCTION CASING at 10888'
0-10888' 29# N-80 BTC
Underreamer fish · 10559'
PBTD at 10559'
WAM/A2401.CHT
BAKER FV-6 TRSCSSV at 304'
(2.313 Profile)
24' CONDUCTOR at 370'
MANDREL at 2138'
MANDREL at 4016'
MANDREL at 5488'
MANDREL at 6576'
*-31' STRIP PERF GUN STUCK in GLM#4**
MANDREL at 7412'
MANDREL at 7995'
MANDREL at 8547'
MANDREL at 9066'
'X' NIPPLE at 9113'
BAKER 'HB' PACKER at 9152'(Center)
'XN' NIPPLE at 9191'
WLREG at 9193'
EOT at 9193'
(2-7/8' 6.5# N-80 EUE 8RD)
S F_P ?-8 't99~
Gas Cons. Commission
Anchorage
PROFS Note
June 9, 1994
Page 1
From: EP388TAR--VM35
To: EP383RGB--VM35
EP388MAJ--VM35
R G BLACKBURN
W A MILLER
Date and time
EP38PTH --VM35
EP38DLM --VM35
06/07/.94 18'08:33 P T HUCKABEE
D L MARSHALL
From: TOM REESE
Subject: ~ ON 6-7-94. CHANGE-OUT TOP GAS-LIFT VALVE.
EQUALIZED WELL. AFTER EQUALIZING WELL I NOTICED THAT CASING PRESSURE HAD
DROPPED TO 700#. IT SHOULD NOT DROP THAT FAR AFTER EQUALIZING.
LEFT EQUALING HOSE OPEN TO OBSERVEAFTER PULLING GAS-LIFT VALVE.
RIH AND PULLED 1" GAS-LIFT VALVE FROM 2117 (WLH).
CASING DROPPED TO 300# AND TUBING ONLY DROPPED TO 600#. NOT POSSIBLE
UNDER NORMAL CIRCUMSTANCES.
RIH WITH 1" DANIELS GAS-LIFT VALVE SET AT 950# WITH 3/16" PORT.
SET GAS-LIFT VALVE AT 2117 {WLM).
BLEED CASING DOWN TO SEE IF IT WOULD BLEED OFF. IT BLEED OFF IN 1 MINUTE,
WHICH INDICATES THAT THE CASING IS PLUGGED CLOSE TO SURFACE.
PUMPED METFLANOL DOWN CASING. LET SET FOR 30 MINUTES. CASING PRESSURE
DROPPED FROM 960# TO 850#. PUT INJECTION GAS TO WELL. STARTED TAKING GAS.
INJECTED METHANOL WITH THE GAS. PUT WELL ON PRODUCTION. WELL IS FLOWING
AT THIS TIME.
LAST PRODUCTION TEST WAS AS FOLLOWS: GROSS 128; CUT 48; CLEAN 67; INJ 959:
PROD 157; GOR 2359; TBG 100; CSG 610; H2S 18; SCP 6.
END OF NOTE
Ak~sl~ Oki & Gas Cons. Corniness'mn
June g, 1994 ~--~ PROFS Note ~'~ Page I
From: EP388TAR--VM35
To: EP383RGB--VM35
EP388MAJ--VM35
R G BLACKBURN
W A MILLER
Date and time
EP38PTH --VM35
EP38DLM --VM35
06/0.6/94 10:15:53 P T 'HUCKABEE
D L MARSHALL
From: TOM REESE
Subject: ~ ON 6-5-94. FISH PERF GUNS.
RIH WITH MODIFIED 2.29 OVERSHOT WITH 2.0" GRAPPLE. LATCHED FISH AT
6532 (WLM). JARRED 7 TIMES TO 2350 (WU~). PO(04. RECOVERED MPD ANO PART
OF X-OVER TO PERF GUNS.
RIH WITH 2.25 OVERSHOT WITH 1.66 GRAPPLE. LATCHED FISH AT 6532 {WLM).
JARRED 2 TIMES. POOH. NO FISH.
RERAN 2.25 OVERSHOT WITH 1.66 GRAPPLE. LATCHED FISH AT 6532 (WLM).
JARRED 5 TIMES TO 2200#. SLIPPED OFF. COULD NOT LATCH FISH AGAIN. POOH.
RERAN 2.25 OVERSHOT WITH 1.66 GRAPPLE. COULD NOT LATCH FISH AT 6532 (WLM).
RIH WITH 2.29 OVERSHOT WITH 1.90 GRAPPLE. LATCHED FISH AT 6532 {WLM).
JARRED 20 TIMES TO 2500#. POOH. HAD TOP OF PERF GUN CONNECTION.
LEFT IN HOLE IS THE 31' OF STRIP GUN.
WELL HAS BEEN SHUT IN.
END OF NOTE
PROFS Note
April 22, 1994
Page I
From: EP388TAR--VM35
To: EP383RGB--VM35
EP388MAJ--VM35
R G BLACKBURN
W A MILLER
Date and time
EP38PTH --VM35
EP38DLM --VM35
04,A1~/.94 10:30:40 P T HUCKABEE
D L MARSHALL
From: TOM REESE
Subject: ALI~I~-It ON 4-10-94. FISH PERF GUNS.
RIH WITH 1 5/8" JDC PULLING TOOL. FOUND TOP OF PERF GUNS AT 6689 (WLM).
PULLED UP HOLE TO 6550 (WLM). SLIPPED OFF. TOOLS FELL DOWN HOLE TO
7240 (WLM). POOH TO CHECK TOOL.
RIH WITH 1 5/8" JDC PULLING TOOL. FOUND TOP OF PERF GUNS AT 7240 (WLM).
JARRED UP HOLE TO 7108 (WLM).SLIPPED OFF.
RIH WITH 1 29/32" OVERSHOT AND 1 1/2" ROPE SOCKET ON 2" JDC PULLING TOOL.
FOUND PERF GUNS AT 7320 (WLM). JARRED FOR 10 MINUTES. SHEARED PIN.
RIH WITH 2" JDC PULLING TOOL. FOUND PERF GUNS AT 7352 (WLM). JARRED UP HOLE TO
6532 (WLM). JARRED FOR 2 HOURS. COULD NOT MOVE. SHEARED OFF.
FISHING TOOL LATCHED ONTO PERF GUNS IS 44" LONG WITH MAXIMUM OD OF I 29/32".
DIAGRAM IN WIRELINE LOG BOOK.
NO PRODUCTION DATA DUE TO THE FACT THAT I WAS ON PLATFORM A AT TIME OF REPORT.
END OF NOTE
~\tsY,~ Okk ~k G~S Gons. Gomm'~ss'm~
DNLY REPORT
P~TFORM: A ~: ~4-01 31-M~-~ FOREM~: R.H. SEL~ "~/' '
A~H: $2~,~ ONLY: $750.00 CUMU~TI~: $259~
DAI ~: .... 0 ~1 ~D: .... 1 DAY & DAYS ES~MA~D: 12.~ OF!6
COM~NTS: NO ACCIDENTS REPOR~ FLUID ~E: PRODUCTION ~I~T:
DAYS ~~~ LTA .... ~
SPI~: NO SPI~S REaReD RT TO ~G ~GER: ~.50' TOF: 10,~'
TIME ~D 0UMM~Y OF OPERATIONS:
I
7.~ HRS - P~F~ATE ~ PO~ (GR-GS)
RUN #2 ..-.,.2..!/8'. RETRIEVABLE STRIP PHASED ENERJET 6 SPF
~": -'SHOOT ~,~, :~'i~'-;~
"':' NOTE;" WHILE' COMING OUT W/SPENT PERF GUN, TOOL BECAME STUCK IN GLM #4
es~ - WORLD TOOL SEV~R~. HRS ~. ATTEMPT TO PULL FREE - NO LUCK - PUU-i
2650 FT LB AND PULL OFF AT WEAK POINT - il=irT IN HOLE; 1 3/8' ROPE SOCKET,
1 11/16' v~rl' BAR, COLLAR LOGATOR, 2' MAGNET, 2 1/8' SPENT RETRIEV EJ GUN -
TOTAL LENGTH OF FISH 48.35'
RECEIVED
SEP 2 8 19~4
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS FTC Alaska 0it & Gas Cons Gommtssto
Anchora,~o
·
SWEPI SUPERVISION & LABOR:
CONTRACT SERVICES:
A.CONTRACT CREW + RS&D
B..CATERING
C..FISHING
D..CEMENTING
E..STIMULATION, OTHER PUMPING
F..PRODUCTION EQUIP SERVICES
G..PERFORATING
H..PACKER, PLUG ~'TTING
I..LOGGING, OTHER ELECTRIC MNE
J..SMCKM~, BRAIDED MNE
K..WELLHEAD SER~CE
L.OTHER SERVICE (TONG OP.)
TOTAL CONTRACT SERVICES
'SUMMARY OF DAILY COST'
$7S0.00
$0.00
$o.oo
MATERIALS:
/L.SWEPI PURCHASED RIG SUPPUE~
B..WORKOVER FLUIDS & ADDITIVESi
C..PACKER, SSS'V, CONTROL UNE
D..BRIDGE PLUGS, RETAINERS, EZS;V
E..TUBING, PUPS, COUPUNGS, X-O','
F..GAS UFT MANDRELS & VALVES
G..X- & XN NIPPLES
H..WEUJ-IEAD EQUtPMENT
I..BOP, KOOMY, CHOKE PARTS
L..OTHER MATERIALS PLUS FUEL
TOTAL MATERIALS
WORK STRING RENTAL (DP/DC/JARS
TOOLS, SUPS, ELEV RENTAL
SPECIAL TOOLS FTC RENTAL
OTHER RENTAL
TRANSPORTATION: FIXED COST
TRANSPORTATION: ALL OTHER
TOTAL TRANSPORTATION COST $0.00 TOTAL RENTALS $0.00
·
gO/;O'cl ~ 1:1..-I0 3NU
Oi ti tu~o~.$elcl I laqS l~3~ld Wc~£:80
£0 '-d qUiOi
DNLY RE~RT
P~TFORM: A ~ ~4-01 30-Mar-~ FOREM~: R.H. ~L~
~; ~667 ENGINE~: P. T. HUC~EE
A~H: $2~,~ DNLY: $750.~ CUM~TI~:
DAI ~D: .... 0 ~1 ~D: .... I DAY & DAYS
',
COM~S: ~ ~CIDENTS REPOR~ FLUID ~E: ~ODUC~ON
DAYS WI~O~ LTA .... ~2
SPI~: NO SPILLS REPOR~D RTTO ~G H~GER: ~.~' jTOF:
Ti~ ~D SUMM~Y OF O~ATIONS:
20 ERS - R~ SCHL~B~GER TO PERFORA~ '~ P~L (GR-GS)
CORR~ TO SCHLUMB~GERS DENSI~ LOG (4-13-94) & COMP~ON RECORD'
RUN ~1 - 2 1/8 R~I~~ Sm~P PHASED ENERJET 6 SPF 96~' - 97~'
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
SWEPI SUIF..RVlSlON & LABOR:
CONIl~CT SERVICES:
A..CONTRACT CREW + R~&D
B..CATERING
C..FI~HING
D..CEMENTING
E..STIMULATION, OTHER PUMPING
F,.PRODUCTION EQUIP SERVICES
G..PERFORATING
H..PACKER, PLUG SETTING
I..LOC-,GING, OTHER ELECTRIC UNE
J..SUCKUNE, BRAIDED UNE
L..OTHER ~ERVICE (TONG OP.)
TOTAL CONTRACT SERVICES
TRANSPORTATION: FIXED COST
TRANSPORTATION: ALL OTHER
TOTAL TRANSPORTATION COST
"SUMMARY OF DALLY COST'
$750.00
$o.oo
$0.00
MATERIALS:
A..SWEPI PURCHASED RIG SUPPLIES SO. DO
B..WORKOVER FLUIDS & ADDITIVES
C..PACKER, SSSV, CONTROL UNE
D.BRIDGE PLUGS, RETAINERS. EZS¥ $0.00
E..TUBING. PUPS, COUPLINGS, X-Of,'
F..GA$ UP-i' MANDRELS & VALVES $0.00
G..X- & XN NIPPLES SO.00
H..WELLHEAD EQUIPMENT SO.DO
I..BOP, KOOMY, CHOKE PARTS
L..OTHER MATERIALS PLUS FUEL
TOTAL MATERIALS : SO.O0
I
WORK STRING RENTAL (DP/DC/JARS)[ SO.DO
TOOLS. SUPS, ELEV RENTAL SO.O0
SPECIAL TOOLS UTC RENTAL SO.DO
OTHER RENTAL SO.DO
TOTAL RENTALS
c~0/£0' 8 =ID I ~13 DN~ 0.1.
*; ~-~ DALLY REPORT
*; PLATFORM~ A WELL: A24-01 25-Mar-94 FOREMAN: R.V. WELLS
ENGINEER: F. T. HUCKABEE
~'AFE: 26366T
"AUTH:$260;,000 DALLY: $57,854.00 CUMULATIVE: $257,894''~
·
~' D~! ~TD: .... 0 IRI 5q'D: .... 1 DAY & DAYS ESI~MATED:
= COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4
~ DAYS WITHOUT LTA~... 357
'; SPILLS: NQ SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559'
*; TIME AND S.'UMMARY OF OPERATIONS:
18 HRS- FINISH TEARING OUT RIG FOR MOVE T/LEG #2. CLEANING PITS AND INJECTED FLUIDS DOWN DISPOSAL WELL
*; 18 HRS TOTAL THIS REPORT.
RIG RELEASED AT 2400 HRS 03/24/94 FROM A2¢-01 ...~CCEPTED ON A31 -14LW
'~IOTE: TODAYS HIGH COST REFLECTS $45,014 FOR NEW 2 7/8' TUBING.
.........................
SWEPI SUPERVISION & I.A~OR:
CONTRACT~,, ~CE$:
A..CONTRACT CREW + RS&D
B**CATERING
C..FISHING
D..CEMEN.,TING
E.,STIMUI.~TION, OTHER PUMPING
F..PRoOUCTION EQUIP SERVICES
G..PERFOI~TING
H..PACKER, PLUG SETTING
I..LOGGING, OTHER ELECTRIC MNE
J.;SUCKLINE, BRAIDED UNE
L.OTHER SERVICE {TONG OP.)
TOTAL CONTRACT SERVICES
TRANSPOI
TRANSPOI
TOTAL. TRA
qTATION: FIXED COST
~TATION: ALL OTHER
~$PORTATION COST
$750.00
MATERIALS:
$9,860.00 A..SWEPI PURCHASED RIG SUPPUES SO J30
$750.00 B..WORKOVER FLUIDS & ADDITIVES SO.00
$0.00 C..PACKER, SSSV, CONTROL UNE $0.00
$0.00 D..BRIDGE PLUGS, RETNNERS, EZSV SO.O0 '"-
$0.00 E..TUBING, PUPS, COUPUNGS, X-O't $45,014~
$0.00 F..GAS MFT MANDRELS & VALVES $0.00
$0.00 G.J(- & XN NIPPLES $O.00
$0.130 H..WELLHEAD EQUIPMENT
$0.00 I..BOP, KOOMY, CHOKE PARTS $0.00
$480.00 L.OTHER MATERIALS PLUS FUEL
$0.00 TOTAL MATERIALS $46,014.00
$11,090.00 WORK STRING RENTAL (DP/DC/JARS) SO.IX3
TOOLS, SLIPS, ELEV RENTAL $0.00
$0.00 SPECIAL TOOL8 ETC RENTAL $0.00 '"
$0.00 OTHER RENTAL $0.00
$0.00 TOTAL RENTALS $0.00 '"
TOTAL P.01
*= ~ DALLY REPORT
~' PLATFORM:. A WELL: A24-01 24,-Mar-94 FOREMAN: R.V. WELLS
*; AFE: 26366;7 ENGINEER: P. T. HUCKABEE
*; AUTH: $260,000 DALLY: $18,840.00 CUMULATIVE: $200,040 ::=_'
DAI YTD: .... 0 TRI YI'D: .... I DAY & DAYS ESTIMATED: 10.5 OF
COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE:
DAYS WITHOUT LTA.... 356
SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559'
TIME AND SUMMARY OF OPERATIONS:
10 HRS- FINISH NIPPLE DOWN BOPE, REMOVED DOUBLE RAM AND ANULAR PREVENTOR FROM SUB.
[NSTAt LFD TREE. TEST T/5000 PSI F/10 MINS, OK. REMOVE BPV.
4.5 HRS- RIG UP SECKUNE, PULLED PRONG/PLUG FROM "XN' NIPPLE. RIG DOWN SMCKLINE.
9.5 HR$- LAY DOWN 4 DRILL COLLARS AND JARS FROM DERRICK, TEARING OUT RIG F/MOVE.
~NOTE: PRODUCTION STRING WAS RAN EXACTLY AS REPORTED ON 19-MAR-94 REPORT.
~ ~DIHON~ COM~S; DRI~S, VISITORS, INSPE~ORS ETC...
"SUMMARY OF DALLY COST' *:
SWEPI SUPERVISION & LABOR:
CONTRACT SERVICES:
A;..CONTRACT CREW + RS&D
B,.CATERING
C..FISHING
D..CEMENTING
E..STIMULATION, OTHER PUMPING
F.,PRODUCTION EQUIP SERVICES
G..PERF~TING
H..PACKI~, PLUG SE1-HNG
I.,LOGGtN~; OTHER ELECTRIC LINE
J..SMCKLINE, BRAIDED UNE
K..WELLHE. AD SERVICE
L..OTHER '.SERVICE (TONG OP.)
TOTAL CON,taCT SERWCES
TRANSPOI~ITATION: fiXED COST
TRANSPOSTAllON: ALL OTHER
TOTAL TRANSPORTATION COST
$750.00
$750.00
$0.O0
$0.00
$480.00
$0.00
$17,090.00
$0.00
$0.00
$0.00
MATERIALS:
A..SWEPI PURCHASED RIG SUPPUES
B..WORKOVER FLUIDS & ADDITIVES
C..PACKER, SSS',/, CONTROL UNE
D..BRIDGE PLUGS, RETAINERS, EZSV
E..TUBING, PUPS, COUPUNG$,
F..GAS MFT MANDRELS & VAL¥1ES
G.J(- & XN NIPPLES
H..WELLHEAD EQUIPMENT
i..BOP, KOOMY, CHOKE PARTS
L.OTHER MATERIALS PLUS FUEL
TOTAL MATER~N.S
WORK STRING RENTAL (DP/DC/JARS)
TOOLS, SUPS, ELEV RENTAL
SPECIAL TOOLS ETC RENTAL
OTHER RENTAL
TOTAL RENTALS
$1,000.00 =:
$0o00"
TOTAL P. 01
*~ ~--~ DALLY REPORT
~' PLATFORIVE A WELI~ A24-01 23-Mar-9~, FOREMAN: R.V. WELLS
"AFE: 263667 ENGINEER: P. T. HUCKABEE
~- AUTH: $26q,000 DAILY: $38,S94.00 CUMUI~TJVE: $181,200 '~ ....
,
~- DN YTD: .... o TRI YTD: ....1 DAY & DAYS ESTIMATED: 9.5 OF 6
~. COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FtW WEI~: 8.4
*= DAYS WITHOUT LTA .... 355
~. SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,5~9'
TIME AND SUMMARY OF OPERATIONS:
gECEIVE
1.0 NILS- TIN T/4~S6', TBG STOPPED, BEGAN PISTON EFF'EOT OF PUSHING FLUID OUT TB .
*"2.0 HR$- SL,~FACE INDICATIONS ARE THAT THE PACKER ELEMENTS PINS SHEARED AGAIN.
'; RIGGED UP SUCKUNE, RIH AND PULLED BOTTOM GAS UFT VALVE. RIG DN.
~.$.5 HRS- fiNISH TIH W/COMPLETION STRING OK.
~.2.0 HRS- ClflC WELL VOL T/CLEAN OUT WELL ~la~ka
~.4,0 HR$- RIG UP SUCKLINE, SET BTM GAS LIFT VALVE, SET PLUG/PRONG IN XN NIPPLE.
'~2.0 HRS- TRY T/$ET PACKER W/TEST PUMP, NOT ABLE TO GET ENOUGH VOL TO CLOSE VAL~I~S.
~. RIG UP W/RIG PUMP ON TBG, PRESSURE UP T/2S00, SHUT DOWN PUMP, TBG BLED
" OFF T/900 PSI, ANNULUS QUIT FLOWING THO. SURFACE INDICATIONS ARE THAT THE
*: PACKER'SET OK BUT THE PLUG/PRONG IN THE XN NIPPLE IS NOT SEATED WELL.
*'6.5 HRS- RIG UP SUCKUNE, PULLED FRONG/PLUG, REDRESS, RE-RAN THEM, SET IN XN NIPPLF_
';1.0 HRS- PRESSURE UP TBG T/3500 PSi WrieST PUMP, OK. PRESSURED UP ANNULUS T/1200, OtC
*;2.0 HRS- SET BPV IN TBG HANGER, NIPPUNG DOWN BOPE AT RPT TIME.
'. 24.0 I~IRS- TOTAL
~- NOTE: DID NOT USE DRILL PIPE, DC'S OR DC SUPS/CLAMP ON 03/22, USED ALL ELSE.
~. ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
*MORN TOUR CREW HELD TRIP DRILL DURING WEEKLY ER DRILL. HAD H2S GAS ALARM.
*1CRITIQUE OF DRILL FOUND THAT SOME PERSONEL DID NOT REAMZE THAT SOME AREA OF THE
*PLATFORM uTJu~s UGHTS INSTEAD OF BELLS FOR AN ALARM DUE TO THE HIGH NOISE LEVEL THERF_
"SUMMARY OF DAILY COST'
~' swEPI SUPERVISION & LABOR:
CONTRA ,GERVlCES:
A..CONTR~CT CREW + RS~
B..CA~RI~G
= D.,~ME~I~
~ E..STIM~ON, O~R PUMPING
' F..~OOUC~ON E~P ~CES
· ,
· ' I..L~IN~, O~R E~IC UNE
.
TRANSPOI~TATION: FIXED COST
TRAN~oRrrATION: ALL OTHER
TOTAL TRAI'~$PORTATION COST
$750.00
MATERIALS:
$9,860.00 A..SWEPI PURCHASED RIG SUPPLIES $0.0~
$750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00
S0.00 C,.PACKER, S~SV, CONTROL UNE $14,151.00
$0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $4,914.00
$0.00 E..TUBING, PUPS, COUPLINGS, X-O", $0.00
$0.00 F..GAS UFT MANDRELS & VALVES $0.00
$0.00 G.~(- & XN NIPPLES $0.00
$6,68g.00 H..WELLHEAD EQUIPMENT
$0.00 I..BOP, KOOMY, CHOKE P~J~TS $O.00
$480.~ L.OTHER MATERIALS PLUS FUEL
$0.00 TOTAL MATERIALS $20,06,5.00
$17,779.00 WORK STRING RENTAL (DP/DC/JARS) $0.00
TOOLS, SUPS, ELEV RENTAL $0.00
SPECIAL TOOLS ETC RENTAL $0.00
OTHER RENTAL $0.00
TOTAL RENTALS $0.00
TOTAL P,01
DALLY REPORT ~.
PLATFORM: A WELL; A2¢-01 22-Mar-94 FOREMAN: R.V. WELLS ~'
Al=E: 263667 ENGINEt~t: P. 1'. HUCI~E ~.
AUTH: $260.I300 DAILY: $26,187.00 CUMULATIVE: $142,606 ' "/' ~'
~' DAI YTD: .... 0' TRI YTD: .... I DAY & DAYS ESTIMATED: 8.5 OF 6 *'
COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FtW WEIGHT: 8.4 ';
DAYS WITHOUT LT/L... 354 ~-
SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559' '"-
TIME AND SUMMARY OF OPERATIONS:
2.5 HRS- FINISHED TESTING BOPE. /tO ~/~,~
2.5 I-IRS- RETR~D STROM PACKER FROM 85', TIH AND LATCH ONTO flElP. '
2.5 HRS- CIRCOUT OIL/GAS FROM UNDER RBP. ~
4.0 I-IRS- POH, LAY DOWN RBP AND PULLING TOOL. /i/,~,,, O~C/~
1.5 HRS- REMOVE 3 1/2' RAMS, INSTALL 2 7/8" PIPE RAMS, TEST. OK. °va ~?~
11 0 HR$- RIG TSG TONGS, TIH W/PRODUCTION STRING T/2700', WELL KICKED THRU ~r ~.
' TBG. SECURE WELL, CIRC OUT OILY RETURNS THRU GAS BUSTER. UNABLE TO ~/?/~
CONTINUE ON IN HOLE DUE TO PISTON ACTION OF THE PACKER, APPEARS SOMETHING[U~.
IS WRONG WITH THE PACKER. POH W/PACKER AND FOUND THE ELEMENTS SHEAR PINS
WERE SHEARED. SUSPECT THE KICK DID IT. REDRESS W/NEW PINS, AND
TIH AT RPT TIME. '
24.0 HRS TOTAL
*NOTE: USED ALL RENTAL TOOLS LESS DC'S, DC SUPS AND CLAMP 03/21. (DID NOT USE DRILL PIPE OR DC'S, DC SUPS/CLAMP ON 03/22)
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
"~VE TOUR CREW HELD TRIP DRILL AT 1505 HRS, HAD REAL KICK AT 2230 HRS. DID GOOD!
'SUMMARY OF DAILY COST'
SWEPI SUPER[VISION & LABOR:
CONTRACT SERVICES;
~..CONTRACT CREW + RS&D
B..CATERING
C,.FISHING
D..CEMENTING
E..STIMULATION, OTHER PUMPING
F..PRODUCTION EQUIP SERVICES
G..PERFORAT1NG
H..PACKER, PLUG SETTING
I..LOGGING, OTHER ELECTRIC UNE
J..SLJCKMNE~ BRAIDED MNE
K..WEM.HEAD SERVICE
L..OTHER SERVI~ (TONG OP.)
TOTAL CO,CT SERVICES
I
$750.00
MATERIALS:
$9,860.00 /~.SWEPI PURCHASED RIG SUPPLIES
$750.00 B..WORKOVER FLUIDS & ADDITIVES SOJX)
$0.oo C..PACKERS $0.03
$0.00 D..BRIDGE PLUGS, RETAINERS, F_~SV SO.gO
SO.go E..TUBING, PUPS, COUPLINGS, X-O", SO.go
$0.00 F..GAS EFT MANDRELS & VALVES SO.go
SO.go G.~(- & XN NIPPLES $0.00
SO.gO H..WELLHEAD EQUIP, 'AP' SPOOL $13,47g.00
$0.00 I..BOP, KOOMY, CHOKE PARTS SO.gO
$480.~ L..OTHER MATERIALS PLUS FUEL $1,000.gO
$O.00 TOTAL MATERIALS $14,479.00
$11,090.00 WORK STRING RENTAL (DP/DC/JARS) SO.gO
TOOLS, SUPS, ELEV RENTAL SO.gO
TRANSPOI~TATION: FIXED COST $0.00 SPECIAL TOOLS ETC RENTAL SO.go TM
*' TRANSPORTATION.' ALL OTHER SO.go OTHER RENTAL: TEST PLUG ($132.go)~'
": TOTAL TRAI~ISPORTATION COST SO.00 TOTAL RENTALS ($1~12.00)*'
TDTRL P.O1
*' " "'~' DALLY REPORT
*' PLATFORM~ A WELL: A2A-01 21-Mar-94 FOREMAN: R.V. WELLS
*' AFE: 263667 ENGINEER: P. T. HUCKA~F:E
' AUTH: $26q,000 DAILY: $7,902.00 CUMULATIVE:
~ DAI YTD: .... i0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: 7.5 OF 6
*" COMMENTS,: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4
~' DAYS WITHpUT LTA .... 853
*~ SPILLS: NO. SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,559'
TIME. AND ~UMM.N~Y OF OPERATIONS:
2.0 HRS- FINISH POH W/PRODUCTION STRING.
2.0 HRS- CHANGED RAMS FROM 2 7/8' T/3 1/2". TEST DOOR SEALS, FUNCTION TEST RAMS.
*', 10.0 HR$- ~-UP BAKER RETRIEVEABLE BRIDGE TOOL ON RUNNING TOOL TIH ANO
*' SET i~T AT 9795'. TEST T/1000 PSI, OK.
*' 2.0 HRS- CI~C OUT OILY/GASSY FLUIDS ABOVE RBP. PUL~FD 23 STANDS.
~' 1.0 i-IRS- M,AKE UP BAKER STORM PACKER AND SET AT 85' W/KILL STRING UNDERNEATH.
'". 7.5 HRS- HE~I.D PRE-JOB SAFETY/OPERATIONS MEETING, NIPPLED DOWN BOPE, REMOVED
DCB ~SPOOL, INSTAJ f FO NEW 11'5M X 13 5/8" 3M 'AP' SPOOL, NIPPLE UP BOPE.
*' 4.0 HRS- TESTING BOPE PER REQUIREMENTS AT RPT TIME.
~' 24.0 HRS TOTAL -
*'NOTE: USED AIL RENTAL TOOL LESS DC'S, DC SLIPS AND CLAMP 03/20-21/94.
*'NOTE: MADE A CORRECTION IN FUEL COST, DOUBLE DIPPED ON THE ADJUSTMENT OF 3/19-20
!
ADDITIONAE COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
.... ~ ........................................................... .._-~-.~ ........... ~. ......
*; 'SUMM/~Y OF DAILY COST'
~' SWEpI SUPERVISION & LABOR. $750.00
*' CONTRACT SERVICES: MATERIALS:
L..OTHER ~
TOTAL CON'
*; TRANSPOR
TRANGPOR
TOTAt. TRAJ~
~..¢ONTmAIC? CREW + R,S~D
B..CATERING
C..FISHI~
D..~ME~ING
E..S~M~ON, OTH~
F..PRODUC ~ON EQUIP SER~CES
G..PERFOR ~NG
,
H..PAC~, PL~ S~ING
I..LOGGING O~R E~C~IC LINE
J..SUC~, B~D UNE
K..~~ ~. SER~CE
~VlCE ~ONG OP.)
,
RACT ~R~CES
rA~ON: F~D COST
rATION: ~ OTHER
SPORTATION COST
$9,860.00 A..SWEPI PURCHASED RIG 8UPPUE8 S0.1X)
$750.00 B..WORKOVER FLUIDS & ADDITIVES $0,00 *'-
$0.00 C..PACKERS $0.00 *;
$0.00 D..BRIDGE PLUGS, RETAINERS, F..ZSV $0.00 ''"-
$0.00 E..TUBING, PUPS, COUPUNG$, X-O',~ $0~00 '"
$0.00 F..GAS UFT MANDRELS & VALVES $0.(30 ~'-
$0.00 G..X-- & XN NIPPLES $0.00 ':
$0.00 H..WELLHEAD EQUIPMENT $O.00 ~-
$0.00 i..BOP, KOOMY, CHOKE PARTS $0.00 '"
$1,440.00 L..OTHER MATERIALS PLUS FUEL ($4,931.00)"'
$0.00 TOTAL MATERIALS ($4,931,tX:1)"'
$0.00 *'
$12,050.00 WORK STRING RENTAL (DP/DC/JARS) $0.00 ~
TOOLS, SLIPS, ELEV RENTAL $0.00 *~
$0.00 SPECIAL TOOLS ETC RENTAL $0.(30 *'
$0.00 OTHER RENTAL: TEST PLUG $33.00 =~
$0.00 TOTAL RENTALS S33.00 ~.
TOTmqL P. 81
DAILY REPORT
PLATFORM: A WELl; A24-01 20-Mar-94 FOREMAN: R.V.
AFL: 263667 ENGINEER: P. T.
AUTH: $260,000 DALLY: $29,731.00 CUMULATIVE:
DAI YTD: .... 0 TRI YTD: .... I DAY & DAYS ESTIMATE[
COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW
DAYS WITHOUT LT~-... 352
SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 31
TIME AND SUMMARY OF OPERATIONS:
1.5 HR$- FINISH CIRC HOLE CLEAN.
4.0 HR8- DRAIN STACK, LAND TBG HANGER. RIG UP SLICKLINE, SET PLUG/PRC NG IN XN NIPPLE.
9.5 HR$- RIG UP TEST PUMP, PRESSURE UP T/2500 PSI T/SET PACKER, PRESStJRE ON UP
PSI F/TBG TEST. OK. PRESSURE UP ON ANNLUS TO ASSURE PACKER W~S SET BU~THE
TBG HANGER LEAKED. CLOSED ANNULAR PREVENTOR, PRESSURE UP ALCOVE TBG HANGER,
IT STILL LEAKED OFF BADLY. ASSURE HANGER WAS SEATED PROPERLY, ~r w/ts.'
PRESSURED UP ABOVE AND BELOW TBG HANGER SIMULTANOUSLY T/I(XO PSI TO
ASSURE PACKER WAS SET, IT WAS. BLED OFF PRESSURES. ADDED 5 STIC;KS OF
PLASTIC PACKING T/TBG HANGER PACK-OFF, STILL LEAKS. DETERMINATION IS '.
THE DCB SPOOL IS DAMAGED BEYOND ACCEPTABLE SERVICE..MUST REP LACE IT. · *;
RIG UP SUCKUNE, PULLED BOTTON GAS UFT VALVE, PRONG/PLUG. ·
5.0 HRS- BACKED OUT TBG HANGER SET SCREWS, UNSEAT PACKER, ClRC OU OIL/GAS 3{JPROOi
4.0 HRS- POH W/TOG AT RPT TIME. {TOOK 55K TO UNSEAT PACKER) -- '.
24 HR$- TOTAL ·
'SUMMARY OF DAILY COST' · · ,
TRANSPORTATION: FIXED COST
SWEPI SUPERVISION & LABOR:
CONTRACT SERVICES:
~L.CONTRACT CREW + RS&D
B..CATERING
C..FISHING
D,,CEMENTING
E..STIMULATION, OTHER PUMPING
F..PRODUCTION EQUIP SERVICES
G..PERFORATING
H..PACKER, PLUG SETTING
I..LOGGING, OTHER ELECTRIC LINE
J..SLICKI.INE, BRAIDED LINE
K..WELLHEAD SERVICE
L.OTHER ~RVICE (TONG OP.)
TOTAL CONTRACT SERVICES
TRANSPORTATION: ALL OTHER
TOTAL TRANSPORTATION COST
$750.00
$9,860.00
$7S0.00
$0.00
$0.00
$0.00
$0.00
$7,325.00
$17.933.00
$0.00
$0.00
$0.00
MATERIALS:
~,.SWEPI PURCHASED
B..WORKOVER FLUIDS
C..PACKERS
D..BRIDGE PLUGS, RET
E..TUBING, PUPS. COUI
F..GAS LIFT MANDRELS
G..X- & XN NIPPLES
fiG SUPPLIEs
ADDITIVES
JNERS, EZSV
'UNGS,
I
& VALVES ~
H..WELLHEAD EQUIPMI~NT ·
I..BOP, KOOMY. CHOKEJPARTS
I_.OTHER MATERIALS P~.US FUEL
TOTAL MATERIALS j
WORK STRING RENTAL ([)PjDC/JAR~)
TOOLS. SUPS, ELEV RENTAL
SPECIAL TOOLS ETC RECITAL
OTHER RENTAL: TEST PLUG
TOTAL RENTALS
!i$s94.00 '
" $0.00 ~
,
· $0.00"
$;6,931.00 *'
$~S,s2s.oo ~.
!$992.00 ~'
~ $0.00 *'
$~t,523.00"
TO/TO'd Iblq~ 01 U ~J°~)gTd TTOqS ~d Ld~:~O t~66T-£~-60
"' ~'~ DAILY REPORT '~"'~
"; PLATFORM: A WELL: A2.4-01 19-Mar-94 FOREMAN: R.V. WELLS
*' Ar-E: 263667 ENGINEER: P. T. HUCKABEE
*; AUTH: $260.~ DAILY: "
. $17,345.00 CUMULATIVE: $81,17S
~- DAf YTD: .... 0 TRI YTD: ..... I DAY & DAYS ESTIMATED: 5.5 OF 6
COMMENTS: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT:
DAYS WITHOUT LTA .... :351
SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,$69'
TIME AND ~UMM,aRY OF OPERATIONS:
1.5 HRS- FINISH STAGE IN HOLE T/9204' W/T' CASING SCRAPER ON BIT.
2.0 HRS- ClRC VISCOU~ SWEEP AROUND T/CLEAN HOLE.
3.5 HR$- POH W/BIT, SCRAPER, BIT SUB. 4 DC'S, JARS.
2.5 HI:iS- REMOVE 3' RAMS, INSTALL 2 7/8' RAMS AND TEST 250 LOW/S000 H! OK.
1.5 HR$- HELD PRE-JOB SAFETY MEETING, RIGGED UP T/RUN PRODUCTION STRING.
10.5 HR$- TBG DETAILED: WI.REG AT 9193', "XN" NIPPLE AT 9191'. BAKER '!-I~' PACKER
AT g152', (CENTER OF PACKER) "X" NIPPLE AT 9113', 8 GLM'S AT
9066', 8547', 7995', 7412', 6576', 5488', 4016', 2138', AND THE
BAKER FY-6 TRS $SSV W/2.313 PROFILE AT 304' (FLAPPER DEPTH).
RAN:TOTAL OF 285 JTS 2 7/8' 6.5# N-80 EUE 8RD TBG. NO PUPS UNDER HANGER.
UP WEIGHT IS 105K, DOWN IS 95K. THERE AClE 9 BANDS ON CONTROL UNE.
THE HANGi~ IS 3 1/2' 8RD SO THERE I$ AX-OVER FROM IT TO TUBING.
2.5 t-IRS- WITH 'rBG HANGER JUST OFF SEAT, CIRC FIW AT 2 BBL/MIN AT RPT TIME.
24 I-IRS- TOTAL
I .......... i~i~!i!ill
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC
"SUMMARY OF DAILY COST' <;~' '~'~'
SINEPI SUPERVISION & LABOR: $7s0.0o
*~ CONTRACT SER~CES:
A..CONTRAC~ CREW + RS&D
e. B..CATERING
C..FISHIN~
*=' D.,CEMEN~NG
E..STIMUI.~TION, OTHER PUMPING
F. JaF:iODU~Vl'ION EQUIP SERVICES
G..PERFORRTING
H..PACKER, PLUG SETTING
I..LOGGING, OTHER ELECTRIC UNE
J..SUCKUNE, BRAIDED UNE
K..WELLHEAD SERVICE
L.OTHER :SERVICE (TONG OP.)
TOTAL CONTRACT SERVICES
TRANSPOR
TOT
rATION: FIXED COST
rATION: ALL OTHER
SPORTATION COST
MATERIALS:
$9,860.00 A..SWEP! PURCHASED RIG SUPPUE$ $0.00
$750.00 B..WORKOVER FLUIDS & ADDIT~VES $0.00
$0.00 C..PACKERS $0.00
$0.00 D..BRIDGE PLUGS. RETAINERS, EZSV $0.00
$0.00 E..TUBING, PUPS, COUPUNGS, X-O'; $21.00
$0.130 F..GA~ LIFT MANDRELS & VALVES SO.tX)
SO.00 G..X- & XN NIPPLES S0.1X)
$0.00 H..WELLHEAD EQUIPMENT
SO.00 I..BOP, KOOMY, CHOKE PART~ SO.lX)
$0.00 L..OTHER MATERIALS PLU~ FUEL $5,931.00
$0.130 TOTAL MATERIALS $5,952.00
$10,610.00 WORK STRING RENTAL SO.00
TOOLS, SUPS, ELEV RENTAL $0.00
$0.00 SPECIAL TOOLS ETC RENTAL $0.00
$0.00 OTHER RENTAL: TEST PLUG $33.00
$0.00 TOTAL RENTALS $33.00
TOTAl_ P.01
~"'"' DAILY REPORT "'"~
PLATFORM~ A WELt; A26-01 18-Mar-9a, FOREMAN: R.V. WELLS
AFE: 26366F ENGINEER: P. T. HUCKA~EE
ALrTH: $260,000 DALLY: $19,941.00 CUMULATIVE: $63,830 '"/.
DAI Y'rD: .... 0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: 4.5 OF 6
COMMENT$:' NO ACCIDENTS REPORTED FLUID TYPE:
DAYS WITHOUT LT~... ;350
SPILLS: NQ SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,569'
TIME ANO SUMMARY OF OPERATIONS:
5.0 HRS- FINISH RE-TESTING BUNDS, FLOOR VALVES AND UPPER/LOWER IBOPS,
TEST.:.Tf250 PSI LOW AND 5000 PS1 HIGH, 0.1~
7.5 I-IRS- MAKE UP BIT, 4 DC'S AND JARS. STAGE IN HOLE T/Sg66'.
1.5 HRS- RO~ATE/CIRC CLEANING OUT THRU PERFS F/X3966' T/TOP OF FISH AT 10559'
1.0 HRS- CIRC BOTTOMS UP.
9.0 HRS- POH W/BIT, MAKE UP 7" CASING SCRAPER ON BIT, STAGING IN HOLE
AT REPORT ~ME.
24.0 HR$ TOTAL
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
'SUMMARY OF DALLY COST'
SWEPI SUPERVISION & LABOR: $750.00
.
CONTRACT'~=RVICES: MATERIALS:
A..CONTRACT CREW + RS&D $9,860.00 A..$WEPI PURCHASED RIG SUPPME$ $0.00
B..CATERING $750.00 B..WORKOVER FLUIDS & ADDITIVES $256.00
C..FISHING $5,400.00 C..PACKERS $0.00
D..CEMENTING $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0~00
E..STIMULAT~ON, OTHER PUMPING $0.00 E..TUBING, PUPS,' COUPLINGS, X-O',' $0:00
F.,PRODUGTION EQUIP SERVICES $0.00 F..GAS UFT MANDRELS & VALVES $0.00
G.~PERFORATING SO.IX) G.J(- & XN NIPPLES $0.00
H.;PACKER., PLUG GETTING $0.00 H..WELLHEAD EQUIPMENT $2,392.00
i..LOGGING, OTHER ELECTRIC UNE $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00
J..SUGKLII~, BRAIDED LINE $0.00 I_.OTHER MATERIALS PLUS FUEL SS00.00
K...WE~ SERVIGE $0.00 TOTAL MATERIALS $3,148.00
L.OTHER SERVICE (TONG OP.) $0.00
TOTAL GONrflAGT SERVIGES $16,010.00 WORK STRING RENTAL $0.00
TOOLS, SLIPS, ELEV RENTAL $0.00
TRANSPOFiTATION: FIXED GOST $0.00 SPECIAL TOOLS ETG RENTAL :$0.00
TRANSPOP TATION: ALL OTHER $0.00 OTHEFI RENTAI~ TEST PLUG $33.00
TOTAL TRA~ISPORTATION GOST $0.00 TOTAL RENTALS $33.00
TOTAl_ P. 01
DAILY REPORT
PLATFORM: IA WELh A24-01 17-Mar-94 FOREMAN: R.V. WELLS
Al=E: ~ ENGINEER: P. T. HUCKABEE
AUTH: $260JXX) ONLY: $12,525.00 CUMULATIVE: $43,889.~ ....
DN YTD: ....g TRI YTD: ....I DAY & DAYS ESTIMATED:
COMMENTS: NC) ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT:
DAYS WlTHI~FT LTA.... :349
SPH.LS: NO[SPIU.~: REp(]mRqlED RT TO TBG HANGER: 38.50' TOF: 10,$69'
TIME AND SUMIWIN%Y OF OPERATIONS:
2.5 HRS- WAIT ON TOP SUB.
8.0 HRS- ~ UP WASH PIPE/SHOE, 40C'SlJARS, TIH TI4OOS~'.
1~ HRS- WASH CLEN~ OUT F/lOOSr
2-~ HIS- TOOK HEAVY OIL/GAS FLOW AT BOTTOMS UP, PUT WELL ON CHOKE, CIRC CLEAN.
0,5 HRS- WORK OVER FISH Fi10559' T/10579', PULLED UP T/300K, LOST WEIGHT.
WOR~ BACK {2OWN TI10579' SEVERL TIMES, NEVER REGAiI~ED A PURCHASE.
7.0 HRS- PUMP DRY JOB, BLOW OOWN TOP DRIVE, POH. NO RECOVERY. LEFT 8' PIECE
OF BOTTOM OF SHOE AND 4 OF THE lff COLD ROLL BY 2' LONG
WEUDED IN~IDE OF THE SHOE, GRABBEFI$. (6 PIECES OF JUNK LEFT IN HOLE)
1.5 HRS- RIGGING TO RE-TEST BLIND RAMS. SEE, NOTE BELOW.
Aoomo~ COMMENTS: mILLS. VISITORS, INSPECTORS ETC...
~ $1NEiml SuimEFhlSHON & LABOR:
' ~.CO~~ ~ + R~ $9.~.~ ~.~~ ~~D RIG S~8
~ C~~ ~.~ C~A~S
' F.~~ EQ~ ~~ ~.~ F..~ ~ ~~ & V~$
~ d..SU~ ~ ~ U~ ~ ~~ ~~ PLUS
~ TOT~ ~ ~A~N ~ ~ TOT~ RE~~
$750.00 ,-
TOTRI.. P.01
DALLY REPORT
PLATFORM: .~ .WELL: A24-01 16-Mar-94 FOREMAN: R.V. WELLS
Al=E: 2636671 ENGINI;I~: P. T. HUCKABEE
~ ' '~ . ,: r '
AUTH: S260,~ DALLY: $15,926.00 CUMULATIVE: $31,363 · .'/.
DAI YTD: .... D TRI Y'rD: .... 1 DAY & DAYS ESTtMATED; 1.5 OF 6
COMMENT~: NO ACCIDENTS REPORTED FLUID TYPE: FiW WEIGHT: 8.4
DAYS WITHOUT LTA.... 348
SPILLS: NOiSPILLS REPOR'TED RT TO 'I'BG HANGER: 38.50' TOF: 10,569'
TIME AND SUMMARY OF OPERATIONS:
1.0 HRS - ~NISHED CIRC OUT OIL.JGAS
12.0 HRS - PO.H LAYING DOWN TUBING, GLM'S AND PACKER. CHECKED FOR N.O.R.M.
RONE FOUND. FULL RECOVERY OF PRODUCTION EQUIPMENT.
7.5 HRS - I~C, KED UP 'I'BG HANGER, INSTALLED 2 WAY CHECK VALVE. SET HANGER,
RUN lIN:2 LOCK DOWN SCREWS. PRESSURE UP, 2 WAY CHECK LEAKING.
PULL TBG HANGER, INSTA~_I ;rD FLOOR VALVE ON BTM OF HANGER.
SET HANGER, TEST BUNDS, 2 FLOOR VALVES, UPPER/LOWER IBOPS
T/260 .P~! AND 5000 PSI. HAD PROBLEMS REMOVING 2 LOCK DOWN SCREWS.
1.0 HR$ - M.aiKE UP HOMCO JUNK BASKET/WASHPIPE, HAD INCORRECT THREAD ON TOPSUB.
2.5 HRS - WAIT ON CORRECT THREADED TOPSUB FOR WASHPtPE.
ADDmONN., COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
*HAD H2S mILL,AT 14,30 HRS. (SUMP PUMP ROOM) ALL RESPONDED WELl_
*; SUMMARY OF DALLY COST'
SWEPI SUPER. VISION & LABOR: $750.00
CONTRACT'". SERVICES: IVlATERIALS:
A..CONIP, ACT CREW + RS&D $9,860.00 A..SWEPI PURCHASED RIG SUPPUES $0.00
B..CATERI.N~ $750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00
C..FISHING $0.00 C..CLEAN OUT BIT. $4,296.00
D..CEMEINrrlNG $0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0.00
E..ST1MULATION, OTHER PUMPING $0.00 E..TUBING, PUPS, COUPt.tNGS, X-O't $268.00
F..PRODUCTION EQUIP SERVICES $0.00 F..GAS UFT MANDRELS & VALVES $0.00
G..PERFORATING $0.00 Q..X- & XN NIPPLES $0.00
H..PACKI~, ':PLU{3 SETTING $0.00 H..WELLHEAD EQUIPMENT $0.00
I..LOGGING, OTHER ELEC'IRIC UNE $0.00 I..BOP, KOOMY, CHOKE PARTS $0.00
J..SUCKL.INE, BRAIDED UNE $0.00 L..OTHER MATERIALS PLUS FUEL $0.00
K..WEU. HEAD SER~CE $0.00 TOTAL MATERIALS $4.,566.00
L..OTHEI; SERVICE (TONe OP.) $0.00
TOTAL COI~t'I'RACT SERVICES $11.360.00 WORK STRING RENTAL $0.00
TOOLS, SUPS, ELEV RENTAL $0.00
TRANSPO=~TATION: FIXED COST SCi.(X) SPECIAL TOQLS ETC RENTAL ' $0.00
TR3~SI:q3 :ITATION: ALL OTHER $0.00 OTHER RENTALS $0.00
TO~AL TR,a NSPQRTATION COST $0.00 TOTAL RENTALS $0.00
TOTRL P.O1
~' '~'-/ DALLY REPORT
' PLATFORMiA WEL~ A2¢-01 15-M~-9¢ FOREMAN: R.H. SELTZ
~' AFE: 2636~ ENGINEER: P. T. HUCKABEE
I ..
· AUTH:$2eO,000 DAILY: $11,360.00 CUMULATIVE: $15,437
............... r' ........................................ maw~laraaa,~s~e~a.e...
~' DAI YTD: .... ! 0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: .5 OF 6
': COMMENTS: 'NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4
~ DAYS WlTHtOUT LT~... 347
"' SPILLS: NO SPILLS REPORTED RT TO TBG HANGER: 38.50' TOF: 10,569'
*' l']~ .N%JD 8UMM,N:JY OF OF~.RATJON$:
*'2~.00 HR$ - ~SH Cl~C. WELL TO ~ om:OK T~dNK - HOLD 8~J:EI'Y MEEllNG FOR N/D, N/U - LET WELL ~STABIUZE - PUMP 114 BBL$ DOWN TBS - INSTALL BPV - PULL TREE & SET RISER
*; NOTEi BPV STARTED TO LEAK AFTER RISER WAS SET, STACKED MUD CROSS & BOPS AND
SCREWED LANDING JT INTO TBG HANGER - N/U UP BOPS - NOTE; BPV CONTINUED TO
LEAK, ILIAD TO CLOSE SAFETY VALVE ON TOP ON LANDING JT. (MAX PRESSURE WAS
140 PS, I)- FINISH NAJ BOPS - PUMP 84 BBLS FiW DOWN TBG - PULL BPV - TEST
BOPS i- HYORIL TO 250/3500 PSi, RAMS & ALL OTHER ASSOCIATED EQUIP TO 250/5000 PSI
NOTEi DID NOT TEb"T BUND RAMS - BACK OUT TBG HANGER LOCKING SCREWS - PICK
*'- UP TO. 200,000 AND UNSET PACKER - MONITOR BACKSIDE - ClRC OUT GAS & OIL
NOTE~ BOAT DEUVERED 40,000 GAL DIESEL 3-14-94
ADDITIONAL COMMENTS; DRILLS, VISITORS, INSPECTORS ETC...
"SUMMARY OF DAILY COST'
SWEPI SUPERVISION & LABOR: $750.00
CONTRACTISERVICES: MATERIN. S:
A..CONTR CTCREW + RS&O
B..CATERING
C..FISHIN~ ·
D..CEMEN~NG
E..$TIMUL~TION, OTHER PUMPING
r. F..PRODU~'I;ION EQUIP SERVICES
G..PERF~NG
H..PACKER, PLUG SETTING
I..LOGGIN~, :OTHER ELECTRIC UNE
'". J..$UCKLII~[, BRAIDED UNE
$9,860.00 A..SWEPI PURCHASED RIG SUPPUES $0.00
$750.00 B..WORKOVER FLUIDS & ADDITIVES $0.00
$0,00 C..PACKERS $0.0O
$0.00 D..BRIDGE PLUGS, RETAINERS, EZSV $0.00
$0.00 E..TUSING, PUPS, COUPUNGS, X-O',' $0.00
$0.00 F..GAS MIT MANDRELS & VALVES SO.00
$0.00 G..X- & XN NIPPLES $0.00
$0.00 H..WELLHEAD EQUIPMENT
$0.00 I..BOP, KOOMY, CHOKE PARTS $0.00
$0.00 L.OTHER MATERIALS PLUS FUEL $0.00
$0.00 TOTAL MATERIALS SO.iX)
$0.00
$11,360.00 WORK STRING RENTAL $0.00
TOOLS, SUPS, ELEV RENTAL SO.00
SO.00 SPECIAL TOOLS ETC RENTAL $0.00
$O.00 OTHER RENTALS $0.00
$0.00 TOTAL RENTALS $0.00
TOTAL P.01
DAILY REPORT
PLATFORM: A WELI~ A24-01 14-Mar-94 FOREMAN: R.H. SELTZ
AFE; 2636~, ' ENGINEER: P. T. HUCKABEE
AUTH: $260 000 DAILY: $~,031.00 CUMULATIVE: $4,077 ..':.
/
DAI YTD: .... l0 TRI YTD: .... 1 DAY & DAYS ESTIMATED: .5 OF 6
,
COMMENT~: NO ACCIDENTS REPORTED FLUID TYPE: FIW WEIGHT: 8.4
DAYS ~ LTA .... 346
SPILLS: Nq SPILLS REPOR~D RT TO TBG HANGER: 38.50' TOF: 10,569'
TIME AND ~ UMMARY OF OPERATIONS:
2.00 fIRS - ,¢;KID RIG OVER WELL - RIG UP - R/U SUCKMNE & LUBRICATOR - TEST LUBRICATOR ' TO lS{ i0 'PSI - RIH & PULL SSSV ~ 284' - RIH & PULL ~ GLV @ 9627' - R/D LUBRICATOR
& SUC KUNE UNIT - R/U TO PUMP FIW DOWN TBG, TAKING RETURNS UP ANNULUS TO
' PRODI JCTION HEADER - CIRC. FlW TO KlM.WELL
RIG A¢:CEPTED ON A24-01 ~ 1800 HRS 3-13-94
·
.-0 'b ,,,.,ed
ADI~TIONA COMMENTS; DRILLS, ~ISITORS, INSPECTORS ETC...
ERVISION & LABOR:
SERVICES:
~ CREW + RS&D
TING
I~TION, OTHER pUMpING
,'TION EQUIP SERVICES
~TING
I,. PLUG 8ETrlNG
~,:OTHER ELECTRIC UNE
~E, BRAJDED UNE
· ~D SERVlCE
~RVICE (TONG OP.)
fTRACT SER~ICES
I
TRANSMUTATION: FIXED COST
TRANSI~ORTATION: AIL OTHER
'SUMMARY
$375.00
S2~81.00
$376.00
$0.00
. $3,031.00
OF DAILY COST'
MATERIALS:
/L.SWEPI PURCHASED RIG SUPPUES
B..WORKOVER FLUIDS & ADDITIVES
C..PACKERS
O..BRIDGE PLUGS, RETAINERS, EZSV
E..TUBING, PUPS, COUPMNGS, X-O
F..GAS UFT MANDRELS & VALVES
G.3(- & XN NIPPLES
H..WELLHEAD EQUIPMENT
I..BOP, KOOMY, CHOKE PARTS
I,.OTHER MATERIALS PLU~ FUEL
TOTAL MATERIALS
WORK STRING RENTAL
TOOLS, SUPS, ELEV RENTAL
SPECIAL TOOLS ETC RENTAL
OTHER RENTALS
TOTAL TI~IA~SPORTATION COST $0.00 TOTAL RENTALS $0.00 ~-
TOTAL P. 01
Shell Western E&P Inc.
601 West Fifth Avenue · Suite 800
Anchorage, Alaska 99501
February 15, 1994
Alaska Oil and Gas Conservation Commission
..
3001 Porcupine Drive
Anchorage, AK 99501..
SUBJECT: SUBMITTAL OF APPLICATION FOR SUNDRY APPROVALS
(FORM 10-403) for MIDDLE GROUND SHOAL A24-01
Enclosed in triplicate is the Application for Sundry Approval for a rig workover to pull the
tubing and perforate the "F" pool in the MGS A24-01. Also, if an underreamer fish can be
removed from the wellbore, additional "G" pool interval will be perforated. If you have any
questions or wish to discuss, please call Paul Huckabee at (907) 263-9646.
Sincerely,
Paul Huckabee
Staff Production Engineer
FEB 1 6 1994
0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA
AL~-~'~r(A
OIL AND GAS CONSERVATION COMMI~3N
APPLICATION FOR SUNDRY APPROVALS
Suspend Opera, on shutdown Re-enter suspended well __
1.
Type
of
Request:
Alter cesin~- Repair W-~' Plugging Ti~e extension Stimulate ;i ~i
Change appr~-ed program __ Pu-~'tubing X '~ariance Pe-'~orate X Other
'-- -- 6. Datum elevation (~-'~-or KB/Z~./
Shell
Western
E&P
Inc.
fe~t~
2. Name of Operator
Development X
3. Address 601 West 5th Avenue, Suite 800 Exploratory __
Anchorage, AK 99501 Strafigraphic __
Service
4. Location of well at Platform A, Leg 4, Conductor 28, 1564'N & 378'W of SE Corner of
Sec. 11, T8N, R13W, SM
sudace
At top of productive
interval
At effective depth
At total depth
5. Type et Well:
9966' (M.D.), 5285'N & 2095'E of SE Corner of Sec. 11, T8N, R13W,
SM
10,800' (M.D.), 5699'N & 1935'E of SE Corner of Sec. 11, T8N,
R13W, SM
10,900' (M.D.), 5743'N & 1910'E of SE Corner of Sec. 11, T8N,
R13W, SM
116' DF
7. Unit or Property name
Middle Ground Shoal
8. Well number
A24-01
9. Permit number
73-38
10. APl number
50-733-20258-00
11. Field/Pool
MGS/"G" Pool
12. Present well condition summary
Total depth: measured
true vertical
10,900 feet
9482 feet
Effective depth: measured 10,800 feet
true vertical 9396 feet
Plugs (measured)
Junk (measured)
Casing Length Size Cemented
Structural
Conductor
Sudace 2010° 13-3/8", 61 #, K-55 1300 sx
Intermediate
Production 10,888' 7", 29#, N-80 2100 sx
Liner
Perforation depth: measured 9966'.10,534' (8 Intervals)
true vertical
Tubing (size, grade, and measured depth) 3.1/2", 9.3#, N-80 RUE 8RD @ 9888'
10567' CTU Underreamer
Measured depth True vertical depth
2010' 1832'
10,888'
9472'
RECEIVED
FE~ ! 6 1994
~<~ u. · Gas Cons. C0mmissiol
Anchorage
Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 284'
13. Attachments
Description summary of proposal
Detailed operations program
BOP sketch
14. Estimated date for commencing operation
I15. Status of well classification as:
Oil X Gas Suspended
Service
16. If proposal was verbally approved
Name of approver
Date approved
17. I hereby~certify t~foregoing is true and correct to the best of my knowledge
Signed d-('?..~ , Title Staff Production Engineer
Date
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrityf .BO_P Test_~_ Location clearance__
Mechanical Integrity/est__ Subsequent form required 10- ~ ~ 7'
Approved by order of the Commission
Original Signeo B.~
David W, Johnstor,
IApproval
,
APproved Copy
Returned
Commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
DESCRIPTION SUMMARY OF PROPOSAL ATTACHMENT
MIDDLE GROUND SHOAL WELL NO. A24-01
REPLACE TUBING & PERFORATE "F" POOL
STATUS
MGS A24-01 is currently producing 136 BFPD at 48% H20 cut (71 BOPD) form the
Hemlock ("G" pool). A rig workover is proposed to replace the tubing, clean
out the wellbore to PBTD, and perforate the "F" ~__o_~1. E~ty-six feet of pay
has also been identified in the lower Hemlo~ "G" pool ~nd~ perforated
if clean-out PBTD is below 10557'~--
PROPOSED OPERATIONS SUMMARY
1. SI lift gas injection. Bleed tbg x csg annulus.
2. RU Slickline Unit (SLU) and test lubricator. RIH and pull SSSV from
284'. RIH and pull orifice from bottom gas lift mandrel (GLM) at 9627'.
RD SLU.
3. RU FIW from downstream of CUNO filters and circulate down tubing taking
returns via the tbg x csg annulus to production to displace the wellbore
clean with FIW. Shut in well and monitor pressure build-up to determine
appropriate kill fluid density for workover operations.
4. Kill well with required kill brine or CaC03 mud.
5. Install BPV, ND Tree, and NU 5000 psi BOPE and test Per API RP 53 and
Shell Safe Practices.
6. Install lift sub and PU to shear release Guiberson UNI-VII packer (set @
9846' MD) with straight pull shear release. POOH with 3-1/2" 9.3# N-80
EUE 8rd tubing, SSSV, GLM's, packer, and tubing/packer accessories.
Inspect tubing for NORM scale contamination. Send tubing to Tuboscope
for CLASSIFAX inspection and potential reuse/repair.
7. RIH with washover shoe to recover underreamer fish at 10569'. POOH.
8. RIH with 6" mill and clean out 7" 29# wellbore to PBTD at 10790' (NOTE'
Bottom HN-HR perf at 10534'. Proposed HR-HZ perfs from 10557' - 10643').
Pump 5+ bbl XANVIS polymer sweep to clear debris from wellbore. Dispose
of contaminated return fluid down A44-11. POOH.
9. RIH w/ 6" mill and casing sCraper to 9600' in preparation of setting a
Baker Model "HB" packer at 9550' (+/-). Pump 5+ bbl XANVIS polymer sweep
to clear debris from wellbore. Dispose of contaminated return fluid down
A44-11. POOH.
RECEIVED
C' \F I L ES\PROG\A2401 RI G. PRG
page 1
FEB 1 6 1994
Alaska Oil & Gas Cons. Commission
Anchorage
10. Run the following equipment on 2-7/8", 6.5#, N-80/L-80, EUE 8rd tubing:
a) Baker Wireline Re-Entry Guide (WLREG)
b) OTIS 2-7/8" "XN" nipple (2.205" ID)
c) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing
d) Baker "HB" packer for 2-7/8" x 7" 29# to set at - 9550'
e) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing
f) OTIS 2-7/8" "X" nipple (2.313" ID)
g) one joint 2-7/8" 6.5# N-80 EUE 8rd tubing
h) Bottom Gas Lift Mandrel (GLM)
i) 2-7/8" 6.5# N-80/L-80 EUE 8rd tubing and GLM's per Production
Engineering recommendat ion
j) 2-7/8" Baker "FV-6" TRSCSSV w/ 2.313" "X" nipple profile in top &
1/4" SS control line set at- 300'.
11. Install tubing hanger & land tubing. RU Slickline Unit (SLU) & test
lubricator. RIH and set plug/prong in "XN" nipple below packer.
Pressure up per Baker instruction to set packer. Test tubing to 3500
psi. POOH with plug/prong. RD SLU. Secure hanger in spool.
12. ND BOPE/NU Tree and test each tree component to 5000 psi. Skid rig.
13. Return well to production via gas lift.
14. After ~roducti~s stabilized, RU Schlumberger Electric Wireline Unit
~-E-WLU)~ and ~'erfora~-~ the '~ool (GR-GS) from 9663' - 9720' with 2-1/8"
Retrievable Strip Phased Enerjet guns loaded 6 SPF. RD EWLU. Test well
and report.
C: \F I L ES\PROG\A2401R I G. PRG
page 2
RECEIVED
FEB 1 6 t994
A~ska Oil & Gas Cmn~. G~mmi~m~
8
9
10
11
12
13
COMPLETION EQUIPMENT DETAIL SHEET
MGS A24-01
7/13/87
~10. ITEM
APPROXIMATE
TVD. MD. PSI OR
, ~
1. OTIS BALL VALVE
2. CAMCO KBM MANDREL #1
3. CAMCO KBM MANDREL #2
4. CAMCO KBM MANDREL #3
5. CAMCO KBM MANDREL #4
6. CAMCO KBM MANDREL #5
7. CAMCO KBM MANDREL #6
8. CAMCO KBM MANDREL #7
9. CAMCO KBM MANDREL #8
10. CAMCO KBM MANDREL #9
11. GUIBERSON UNI-PACKER VII
12. OTIS "X" NIPPLE
13. GUiBERSON SHEAR SUB
284 284
2139 2364 1000 3/16
3979 4454 990 3/16
5362 6113 980 3/16
6328 7243 970 3/16
7065 8063 1040 1/4
7480 8520 1030 1/4
7802 8887 1020 1/4
8103 9256 1000 1/4
8411 9627 OR 3/8
8590 9846
8616 9877
8625 9888
CASING
13 3/8", 61/I, K-55 @ 2010' w/1300 sx
7" 29//, N-80 @ 10888'w/2100 sx
TO = 10,900'
TUBING
3 1/2", 9.3#, N-80 EUE 8RD @ 9888
PERFORATED ZONE
GROSS INTERVAL
HC-HD
HC-HD
HE-HF
H[-HK
HK-HN
HK-HN
HN-HR
HN-HR
9966-10026'
10050-10091'
10113-10133'
10187-10215'
10245-10295'
10306-10366'
10390-10475'
10500-10534'
FEB 1 6 t994
Oi~ & Gas Cons. Commission
Anchora{~e
MGS A24-01
PROPOSED WELLBORE DIAGRAM - 2/15/94
XX
()
!3
XXX
<=-
/
-/ BAKER "FV-6" TRSCSSV w/ "X" Profile @ ~ 300'
24" Conductor Casing @ 370'
13-3/8" 61# K-55 Sur~face Casing @ 2010'
2-7/8" 6.5# N-80/L-80 EUE 8rd tubing
GLM MD TVD
_--
1 ' ' 12
2 ' ' 12
......
3 ' ' 12
4 ' ' 12
5 ' ' 12
6 ' ' 12
7 ~' ~' _/ "ORIFICE
PORT Ptro Psc Pso GAS
OTIS "X" Nipple @ ~ 9520' (2.313" ID)
I jt 2-7/8" 6.5# N-80 EUE 8rd tbg
BAKER "HB" Packer @ - 9550' w/ __# shear
1 jt 2-7/8" 6.5# N-80 EUE 8rd tbg
OTIS "XN" Profile Nipple @ ~ 9580' (2.205" ID)
BAKER Bell Wireline Re-Entry Guide @ 8481'
:= GN-GO
: = GR-GS
MD
9663' - 9720' MD
UNDRRMR
FISH?
IIIIIIIII
~~~,,~~~~~~
TD = 10900'
= HC-HD
= HD-HE
= HE-HF
= HI-HK
--- HK-HN
= HN-HR
= HR-HZ
9966' - 10026' 10050' - 10091'
10113' - 10133'
10187' - 10215'
10245' - 10295,, 10306' - 10366'
10390' - 10475', 10500' - 10534'
10557' - 10643' ?
UNDERREAMER FISH @ 10569' ?
< PBTD : 10790' MD
\ 7" 29# N-80 BTC Production Casing @ 10888' MD
RECEIVED
C' \F I L ES\PROG\A2401RI G. PRG
page 3
FEB 1 6 1994
OiL & Gas Cons. Commission
Anchorage
Shell Western E&P Inc.
An affiliate of Shell Oil Company
601 West Fifth Avenue Suite 800,~fj~f
Anchorage AK 99501
June 10, 1992
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Gentlemen:
SUBJECT: SUBSEQUENT REPORT FOR MIDDLE GROUND SHOAL WELL A24-01
.Enclosed are duplicates of the Subsequent Report for the recently
completed jet wash and acid squeeze treatment on Middle Ground
Shoal well A24-01. The work was completed on May 22, 1992.
If you need additional reports or information, please contact
Mr. Paul Huckabee at (907) 263-9646.
Very Truly Yours,
S. B. Brown-Maunder
Sr. Environmental Technician
Alaska Operations
SBBM/dlw
Enclosures
SBBM~061092C.WP5
RECEIVED
JUN 1 7 1992
Alaska.Oil & Gas Cons. Commiss'to~
N~chorage
STATE OF ALASKA
Ab OIL AND GAS CONSERVATION COMMI~,~ _./N r~ R I
REPORT SUNDRY WELL OP RATIO'N ' A [
1, Operations performed: Operation shutdown __ Stimulate_..~_.X Plugging__ Perforate __
Pull tubing__ Alter casing__ Repair well __ Other X
5. type of Well: 6. Datum elevation (DF or KB)
2. Name of Operator Shell Western E&P Inc. Developmenl X 106' DF feet
3. Address 601 W. 5th Avenue, Suite 810 Exploratory 7. Unit or Property name
Anchorage, AK 99501 Stratigraphic Middle Ground Shoal
Service 8. Well Number
4. Location of well at surface Platform A, Leg 4, Conductor 28, 1564'N and 378'W of SE A24-01
Corner of Sec. 11, TSN, R13W, SM
9. Permit number/approval number
At top of productive interval 9966'(M.D.), 5285'N and 2095'E of the SE Corner of Sec. 11, 73-38/92-124
TSN, R13W, SM ':1'0. APl number
At effective depth 10,800' (M.D.), 5699'N and 1935'E of SE Corner of Sec. 11, 50-733-20258-00
T8N, R13W, SM
10,900' (M.D.), 5743'N and 1910'E of the SE Corner of Sec. {1. Field/Pool
At total depth 11, T8N, R13W, SM MGS/"G" Pool
12. Present well condition summary
Total depth: measured 10,900 feet Plugs (measured)
true vertical 9482 feet
Effective depth: measured 10,800 feet Junk (measured) 10,567' CTU underreamer
true vertical 9396 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor
Surface 2010' 13-3/8", 61#, K-55 1300 sx 2010' 1832'
Intermediate
Production 10,888' 7", 29#, N-80 2100 sx 10,888' 9472'
Liner
Perforation depth: measured 9966'-10,534' (8 Intervals)
true vertical
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 ~EUE 8RD @ 9888' RECEIVE
Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 284'
17 1992
13. Stimulation or cement squeeze summary
Alaska 0il & 6as Cons, 60[
Intervals treated (measured) 9400'-10,534' Anchorage.
Treatment description including volumes used and final pressure 23.8 bbls 25:75 xylene:7.5% HCl soak followed by 52.8 bbls 5%
HCl jet wash and 18 bbls 5% + 83 bbls 7.5% HCl squeeze
14. Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 28 36 28 500 80
Subsequent to operation 146 J 184 186 600 110
15. Attachments: MIT test form 16. Status of well classification as:
Copies of Logs and Surveys run
~ Oil X Gas Suspended__ Service
Daily Report of Well Operations -- --
17. I hereby certify that the foregoing ~s true and correct to the best of my Knowledge
~,~r,~ .IA Af~A r3,-,~,, /'~,'/4 ~/OO C~l I~AIT I1~1 r~l IDI It"AT[:::
WELL: A24-01
D~ILY REPORT
RECEIVED
J U N 1 1 1992
Alaska Oil & Gas Cons. CommisSioa
Anchorag
DAILY SUMMARY -
5/16/92 - CONDUCT PRE-JOB SAFETY MEETING WITH ALL PLATFORM OPERATING
PERSONNEL.
- CONTINUE TO RIG UP EQUIPMENT AND PROCESS LINES.
- RECEIVE 15,000 GALS OF DIESEL FROM MV LAFAYETTE @ 1230 HRS.
- ASSIGN COSTS FROM MOBILIZATION TO WELL A24-01 @ 1200 HRS
5/15/92.
- PRESSURE TEST CTU ROPE @ 250/5000#. REPAIR PUMP VALVES AND
VARIOUS LEAKS. PRESSURE TEST FLOW AND PROCESS FLUID LINES
TO SURGE TANKS @ 20/200#. REPAIR VARIOUS LEAKS.
- BLEND 200 BBLS OF 5% HCl WITH FW.
- COMPLETE REPAIRS OF PRESSURE LEAKS. R/U 2.7" "WAVEY" MILL,
2.375" HORZ. PDM, HYD. DISCONNECT, DBLCV. TO 1.5" CTBG.
TEST RUN MILL @ SURFACE.
- RIH WITH MILL ASMY. @ 2000 HRS 5/15/92 WHILE PUMPING FIW @
0.5 BPM. OBSERVE 20% OVERPULL IN SECTION F/9,000' T/EOT.
INCREASE TO 52 GPM AND TAG TIGHT SPOT @ 9865'. WORK THROUGH
TIGHT SPOT. RUN MILL ASMY TO 9900' TD.
- P/U TO 9750' & RIH T/9865'. NO TIGHT SPOT OBSERVED.
- PUMP 5 BBL GEL SWEEP. POH CHASING SWEEP.
- P/U 2.7" "WAVEY" MILL, 2.5" X 6.059" CDH UNDERREAMER.
2.375" PDM. DBLCV. FUNCTION TEST BHA, PRESSURE TEST
LUBRICATOR.
- RIH W/UNRMR ASMY. T/5500' @ REPORT TIME.
5/17/92 - RIH WITH BHA #1 (SEE BELOW) TO 9411' WHILE PUMPING @ 0.25
GPM. (THE LOW FLOW RATE DISABLED THE UNDERREAMER EXTENSION
CAPABILITY)
- WORK BHA THROUGH TIGHT SPOTS IN TUBING @ 9411', 9433',
9600', 9789'. SUSPECT CAUSE IS THE LOCKED UP CONFIGURATION
OF THE BHA COMBINED WITH SCALE IN TUBING. WORK THROUGH
TIGHT SPOTS @ 8-10 FPM.
- EXTEND UNDERREAMER BELOW EOT AND REAM 7" LINER @ 2-2.6 FPM.
ENCOUNTER RESISTANCE (SCALE) ALMOST CONTINUOUSLY TO 10,570'
(36' BELOW PERFORATIONS). PUMP 2EA 5 BBLS SWEEPS WHILE
REAMING TO BOTTOM.
- ENCOUNTER PROBLEM WITH SURGE TANK VENT (FLARE) LINE. R/U
TEMPORARY VENT LINE. INSTALLING SECOND FLAME ARRESTOR AT
BASE OF FLARE BOOM.
- UNABLE TO REAM BEYOND 10,570' DUE TO ZERO P-RATE. BACK REAM
TO 10,200'. REAM DOWN TO 10,570'.
- SLOWLY HOIST TOOL @ 9 FPM WHILE PUMPING 18 BBL SWEEP TO
DISPLACE SOLIDS FROM WELLBORE.
- POH WITH BHA #1.
- BREAK LUBRICATOR. OBSERVE LOSS OF BHA @ HYDRAULIC
DISCONNECT. FISH LOST IN HOLE INCLUDES PD MOTOR &
UNDERREAMER (SEE FISH BELOW). APPARENT CAUSE OF LOSS DUE TO
PREMATURE FAILURE OF HYDRAULIC DISCONNECT.
SBBM/A24-01.WP5
D/%I LY REPORT
5/17/92 - REVIEW PROJECT OPTIONS·
(CONT) - R/D FROM A24-01, LEG #4.
- MOBILIZE WIRELINE FISHERMAN & RECOVERY TOOLS.
- BEGIN MOVE TO A13-01L, LEG #1 @ 0100 HRS 5/17/92.
- SUSPEND OPERATIONS FOR 6 HRS. FOR PERSONNEL TO CATCH UP ON
SLEEP.
- MOVE TO LEG #1, BEGIN R/U ON A13-01L. FLOODING ANNULAR
SECTION WHILE R/U.
BHA DATA:
#1'
·
FISH:
2.7 WAVE MILL, 2.5X6. 059" UNDERRMR, 2. 375" PDM,
HYD DC, DBLCV.
2.7" WAVE MILL, 2.5X6.059" UDRMR, 2.375" PDM,
HYD DC = 18.5' OAL
5/18/92 - WL FISHERMAN W/FISHING TOOLS ARRIVED BY BOAT @ 1700 HRS.
R/U & RIH WITH 2.7" OVERSHOT GRAPPLE, HYD & MECHANICAL JARS.
TOOL SAT DOWN @ #1 GLM. ATTEMPT TO GET PAST #1 GLM (LOW
SIDE POCKET).
- WORK PAST #1 TO #3 GLM. TOOL STUCK ON #3 GLV @ 6113'. JAR
FREE, RELEASE & LEAVE IN HOLE C TBG OVERSHOT ASMY. POH,
REBUILD HYDRAULIC JARS, PREP WL FISH RETRIEVAL· RIH & LATCH
ON WL FISH. RETRIEVE C TBG OVERSHOT ASMY WITHOUT (INTERNAL)
GRAPPLES. SECURE WELL, S/D FOR NIGHT.
5/19/92 - RIH W/IMPRESSION BLOCK. RETRIEVE & OBSERVE GRAPPLE PIECES
IMPRINT.
- RIH W/WIRE SCRATCHER (LOOPED) AND KNOCK GRAPPLE PIECES TO
BOTTOM. OBSERVE SLIGHT SLACK-OFF @ 10107'. TAGGED BOTTOM @
10567'. NO CLEAR INDICATION OF TOF. POH.
- RIH W/IMPRESSION BLOCK. NO EVIDENCE OF TOF.
- RIH W/FISHING STINGER, NO EVIDENCE OF FISH. POSSIBLE LAYER
OF FILL ON TAG @ 10567' TOP OF FISH. POH. R/D WL @ 1500
HRS, 5/18/92.
- REVIEWING OPTION OF WASHING OVER FISH WITH COIL TBG (WHEN
COMPLETING CTU WELL PROGRAMAND FOLLOWING DEMOBILIZATION).
THEN ENGAGE THE SWEPI WL OPERATOR TO ATTEMPT A WIRELINE FISH
RETRIEVAL. EST. COST OF FISH IN HOLE IS $25,000.
5/21/92 - RELOCATE EQUIPMENT TO EAST SIDE OF PIPE RACK. R/U CT
LUBRICATOR ON WELL.
- NEUTRALIZE & PUMP TO PRODUCTION, 200 BBLS OF WORKOVER
FLUIDS. ONSHORE OPERATOR NOTIFIED OF EST. ARRIVAL TIME.
- S/D @ 2300 HRS 5/20/92 FOR NIGHT.
RECEIVED
SBBM/A24-01.WP5
JUN ? 992
Alaska .Oil & .Gas Cons. Gomm..'ms[0~
r~Nlcl~orage
RECEIVED
DAILY REPORT
JUN 1 ? 1992
Alaska Oil & Gas Cons.
Anchorage
5/22/92 - CONTINUE RIG UP @ 0600 HRS. CONDUCT PRE-JOB SAFETY MEETING.
- PRESSURE TEST LP LINES @ 200#, HP LINES & BOPE @ 5,000#.
- RIH W/NOZZLE BHA #1 WHILE JET WASHING @ 1.0 BPM
W/FIW FROM SURFACE T/10,569' (TO REMOVE LOOSE SCALE) TAG TOF
@ THIS DEPTH.
- PUMP 5 BBL GEL/POLYMER SWEEP TO CLEAR SS.
- PUMP 23.8 BBLS 25:75 PAD ACID (25% XYLENE, 75% OF 7.5% HCl).
CHASE W/21 BBLS FIW TO DISPLACE IN LOWER PERFORATED
INTERVAL. SOAK F/10 MINS PUMP 23.8 BBLS FIW TO FURTHER
DISPLACE PAD ACID TO SECOND STAGE INTERVAL. SOAK FOR 10
MINS. PUMP 23.8 BBLS FIW TO FURTHER DISPLACE PAD ACID UP
NEXT INTERVAL. SOAK FOR 10 MINS. PUMP 21 BBLS 5% HCl TO
FURTHER DISPLACE PAD ACID AND TO FILL CTBG (IN PREPARATION)
FOR JET ACID WASH.
- COMPLETE XYLENE 25:75 HCl PAD ACID SOAK. DISPLACE RETURNS
TO SURGE TNK. NOTE: RETURNS CAME BACK WITH A Ph OF 6-7,
MOSTLY XYLENE, HCl SPENT.
- LOCATE NOZZLE @ 10534'. JET ACID WASH PERFORATED INTERVALS
PER BELOW:
10534'-9966' (568') @ 20 FPM HOIST SPEED (28.4 BBLS 5% HCl)
9888'-9400' (488') @ 20 FPM HOIST SPEED (24.4 BBLS 5% HCl)
- RIH W/NOZZLE (BHA #1) @ 10567'. PUMP GEL/POLYMER SWEEP.
DISPLACE RETURNS TO SURGE TANK W/122 BBLS FIW. RETURNS CAME
BACK Ph 7.
- CONDUCT MIT OF TBG/CSG & INJECTIVITY TEST. (CSG FLOODED
W/FIW): COMMUNICATION BETWEEN TBG & CSG IS EVIDENT. DIRECT
RESPONSE WAS OBSERVED INJECTIVITY DATA = 2,450# @ 41 GPM,
CSG @ 2,550#, CTBG @ 4,450#.
- INITIATE ACID SQUEEZE W/NOZZLE @ 10,534'. BEGIN SQUEEZE.
LEADING WITH 18 BBLS OF 5% HCl (USE REMAINING MATERIAL TO
EMPTY TANK). FOLLOW WITH 83 BBLS OF 7.5% HCl. PUMP 125
BBLS OF FIW TO OVERDISPLACE ACID TO FORMATION BY 85 + BBLS.
SQUEEZE DATA AS FOLLOWS:
- TIME PTBG# CSG# GPM BBLS CT#
0027 1250 1500 47 5 4950
2400 2500 46 20 4950
0118 2200 2300 47 4950
0300 2250 2350 46 211 4950
0318 2250 2350 46 226 4950
0335 2100 2250
0353 2100 2200
COMMENT
INITIAL
S/D- ISIP
15 MIN
30 MIN - FSIP
SQUEEZE & DISPLACEMENT RATE LIMITED BY MAX. OP. PRESSURE OF
CT @ 5000#
- BLEED OFF PRESSURE, OPEN WELL TO PRODUCTION HEADER.
- PUMP 5 BBL GEL/POLYMER SWEEP, FOLLOWED BY 130 BBLS OF FIW TO
DISPLACE RESIDUAL WORKOVER FLUIDS TO SURFACE. CAPTURE LOW
Ph FLUIDS AND SWEEP TO SURGE TANK FOR NEUTRALIZATION.
SBBM/A24-01.WP5
D~ILY REPORT
5/22/92 - CAPTURE & NEUTRALIZE 150 BBLS OF WORKOVER FLUID. SHIP TO
(CONT) PRODUCTION HEADER, NOTIFY ONSHORE OF ARRIVAL TIME.
- POH W/NOZZLE ASSEMBLY. SECURE WELLHEAD. RIG DOWN.
- OPERATION ASSIGNED TO DEMOBILIZATION AFE @ 0900 HOURS.
BHA DATA:
FISH:
WL FISH:
2.0" SWIRL NOZZLE, EXTN, DBLCV, HYDDC, CTXO
2.7" CDH MILL, 2.5x6.059" (RETRACTABLE) UNDRMR,
PDM DRV XO = 4.0'
2.7" OVERSHOT W/GRAPPLE, 1.75" 22 ROPE SOCKET.
SBBM/A24-01.WP5
May 5, 1992
Shell Western E&P Inc.
An affiliate of Shell Oil Company
601 West Fifth Avenue Suite 800
Anchorage AK 99501
State of Alaska
Alaska Oil & Gas Conservation Commission
ATTN: Lonnie Smith
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Dear Mr. Smith:
SUBJECT: SUBMISSION OF APPLICATION FOR SUNDRY APPROVAL FOR MIDDLE
GROUND SHOAL WELL NO. A24-01
Enclosed in triplicate is the application for Sundry Approval to
perform a coiled tubing unit acid stimulation operation on MGS Well
A24-01. The Workover is anticipated to begin on May 14, 1992
If you have any questions, '
263-9646. please call Mr. Paul Huckabee at (907)
Very Truly Yours,
S. B. Brown-Maunder
Sr. Environmental Technician
Alaska Operations
SBBM/PTH/dlw
Enclosures
SBBM\050592A.WP5
RECEIVED
u AY - ? 1992
Alaska Oil & Gas Cons. Commissio~
Anchorage
STATE OF ALASKA
AL~ OIL AND GAS CONSERVATION COMMI'~'~N
APPLICATION FOR SUNDRY APPROVA@5q 1 IN [.
1. Type of Request: 'Abandon__ Suspend__ Operation shutdown __ Re-enter suspended well
Alter casing __ Repair Well Plugging__ Time extension Stimulate X
Change approved program __ Pull tubing __ Variance __ Perforate __ Other
i5. ]-ype ot Well: 6. Datum elevation (DF or KB)
2. Name of Operator Shell Western E&P Inc. Development X 116' DF feet
,,,
3. Address 601 West 5th Avenue, Suite 800 Exploratory 7. Unit or Property 'name
Anchorage, AK 99501 Stratigraphic N Middle Ground Shoal
Service 8. Well number
4. Location of well at Platform A, Leg 4, Conductor 28, 1564'N & 378'W of SE C°rner of A24-01
surface Sec. 11, T8N, R13W, SM 9. permit number
At top of productive 9966' (M.D.), 5285'N & 2095'E of SE Corner of Sec. 11, TSN, R13W, 73-38
interval SM 10. APl number
10,800' (M.D.), 5699'N & 1935'E of SE Corner of Sec. 11, T8N, 50-733-20258-00
At effective depth R13W, SM
10,900' (M.D.), 5743'N & 1910'E of SE Corner of Sec. 11, T8N, 11. Field/Pool
At total depth R13W, SM MGS/"G" Pool
12. Present well condition summary
Total depth: measured 10,900 feet Plugs (measured)
true vertical 9482 feet
Effective depth: measured 10,800 feet Junk (measured)
true vertical 9396 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor
Sudace 2010' 13-3/8", 61#, K-55 1300 sx 2010' 1832'
Intermediate
Production 10,888' 7", 29#, N-80 2100 sx 10,888' 9472'
Perforation depth: measured 9966'-10,534' (8 Intervals)
true verticalRECEIVI D
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 EUE 8RD @ 9888'
MAY - 7 1992
Packers and SSSV (type and measured depth) Guiberson Uni-packer VII @ 9846', Otis SSSV @ 28~[laska 0il & Gas Cons, Coml~
Anchorage
,
13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch
15. Status of well classification as:
14. Estimated date for commencing operation 05/14/92
Oil X Gas Suspended
16. If proposal was verbally approved -- --
Service
Name of approver Date approved
17. I hereby certify th ~t the foregoing is true and correct to the best of my knowledge
/~'~...~Z ~ __~r-.0,.....~ Title Staff Production Engineer Date ~'~/
Signed
'' t . FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness IApproval No~.~
Plug integrity__ BOP Test__ Location clearancej~
Mechanical Integrity Test__ Subsequent form require--d 10- ~o ~ .... 'v'~}c~
. 5'-/?-
Approved by order of the Corn Commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
APPLICATION FOR SUNDRY APPROVALS
FORM 10-403 ATTACHMENT
DESCRIPTION SUMMARY OF PROPOSAL
MIDDLE GROUND SHOAL WELL NO. A24-01
MGS A24-01 declined'at an annual exponential decline rate of 28% from 1984 to
1990. Water cut during this time increased from 30% to 45%. Experience with
other MGS producers indicates potential scaling tendencies in this water cut
range. Recent CTU acid treatments on Platforms "A" and "C" have been
extremely successful under similar producing conditions. The latest test was
April 27, 1992 at 56 BPD Gross, 50% H20 cut, and 28 BOPD clean. Continued
production of this well without remedial stimulation work will result in
uneconomic production within 3 years and will recover only 35,000 bbls
additional oil. A coiled tubing unit clean out and acid stimulation is
proposed. A 50 BOPD production increase from successful stimulation of this
well will increase the recoverable oil by 145,000 bbls.
Proposed Operations Summary
1. Fill wellbore via the annulus with Filtered Inlet Water (FIW).
2. Rig up Coiled Tubing Unit (CTU), acid treatment materials & equipment,
and return fluid processing materials & equipment.
3. Clean out wellbore to PBTD with downhole motor and bit/mill assembly.
4. Acid treat via CTU with 5 to 7-1/2% hydrochloric (HC1) acid.
5. Neutralize all return fluids prior to sending to production facilities.
6. Return well to production via gas lift.
RE6EIVfD
Alaska Oil & Gas Cons. Comm'tss%O~
Anchorage
Shell Western E&P Inc.
601 West Fifth Avenue * Suite 800
Anchorage, Alaska 99501
dune 11, 1990
Alaska Oil and Gas Conservation Commission
ATTN: Elaine Johnson
3001 Porcupine Drive
Anchorage, Alaska 99501
SUBJECT: TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI
OPERATED MIDDLE GROUND SHOAL FIELD
Dear Ms. Johnson:
In a recent telephone conversation you discussed with Ms. Susan
Brown-Maunder information that would be helpful to you if we could
provide it. Enclosed, for your convenience and use, are the following:
2 location surveys showing the location of platform A
1 list of conductor/well locations (in relation to the SE corner
of Sec. 11, T8N, R13W) for Platform A wells
1 location survey showing the location of Platform C
1 list of conductor/well locations (in relation to the SE corner
of Sec. 23, T8N, R13W) for Platform C wells
In addition you requested a revised copy of the Well Completion or
Recompletion Report and Log (10-407) for the recently completed well
C21-23. The well location at the top of the producing interval and the
well location at total depth as been changed to reflect the actual
surveyed location.
If you have any further questions regarding these matters, please
continue to contact Susan Brown-Maunder at (907) 263-9613.
Very Truly/Yours,
W. F. Simpson
Manager, Regulatory Affairs
Alaska Division
WFS/SBBM/vj
Enclosures
cc: Susan Elsenbast-AOGCC
\LETTERS\AOGCC\06! ]90. DOC
RECEIVED
JUN ! 3 ]9 0
Oil,& ~;as Cons. Comml~olt
Anchora~ ,
HIDDLE GROUND SHOAL
Platform "A"
WELL/CONDUCTOR LOCATIONS
Leg I - Center of Leg i @ 1627'N & 435'W from SE corner of Sec.11, T8N,
R13W, S.M. ~
A 12-01 I 1632'N & 437'W from SE corner
A 11-01 2 1632'N & 432'W " " "
A 43-11 3 1630'N & 430'W " " "
A 34-11 4 16 25 ' N & 430' W " " "
A 34-14 RD 5 1622'N & 433'W '" " "
A 22-14 6 1622'N & 437'W " " "
A 12A-01 7 1625'N & 440'W " " "
A 13-01 ~ 8 1630'N & 440'W " " "
Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec. 11, T8N,
R13W, S.M.
A 42-11 9
A 44-02 10
A 42-14 11
A 41A- 11 12
A 11-12 13
A 11-13 RD 14
A 31-14 15
A 44-11 16
1685'N & 374'W from SE corner
1685'N & 370
1683'N & 368
1678'N & 368
1675'N & 371
1675'N & 375
1678'N & 378
1683'N & 378 W
II II II
II II II
II II II
II II II
II II II
II II II
II II II
Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec.11, T8N,
R13W, S.M.
Leg 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N,
R13W, S.M.
A 33-11 25 1571'N & 385'W from SE corner
A 14-01 26 1571'N & 381'W " " "
A 12-12 27 1568'N & 378'W " " "
A 24-01 28 1564'N & 378'W " " "
A 13-12 29 1561'N & 381'W " " "
A 33-14 30 1561'N & 385'W " " "
A 41-11 31 1559'N & 388'W "
A 23-01 32 1569'N & 388'W "
JUJ, t 1 3 1990
!\l~ska Oil & Gas Cons. commission1
Anchora~
SBBC/mgs A
I T9N S.M. I ~ J
e
~ ADL 18754 :
ZON~
4
Zl 22 Z3 .' . 24 I~
,
~3 34 3~ 36 31 32
: . ,;. LOCATION OF
~ ~ "JUNI3 1910 s~ CONTAIN[O DRILLINO a
~1~o,.~ii & Gas Con~. [ ~mmission PRO O U C I N 0 P L,',T F O'n M :
T B N S.t~. , gnchora~ SHELL MIDDLE GROUND SHOAL
~ T 7N S.M., ~ ~ PLATFORM "~"
COOt( INLET, ALA*,,A.,
APPLICATION BY SHELL OIL'CO.
LOS ,ANGELES, CALIFORNIA
Ii T. 8 N., R.13 W., S.M. :
32 21
I ' ~l ~2
I
I
I
I
I
I
I
118754 {~
...... ADL b .............
I
I
i
I LEG NO.
I0 II , ,, !
~15 i~ , i~ 13
LEG NO. I LEG NO. 2 LEG NO. 3 LEG NO. 4
P/.ANE COOND//tA T£S
X = 232:783 X: 23,2:846 X: 232~896 X: 2,32,833
Y = 2,485~845 Y =27t85,897 Y:2~485,835 Y :2,485:783
1627: l'~ l~ 435'W
FROM THE SE COR. OF
SEC. II, TBN, RI3W, SM.
PUBLIC I. AND
1681' N B. 372' W
FROM THE SE COR. OF
SEC. IIt TBN, RI3W, SM.
D£$CR'/P
1620'N'81 321' W
FROM THE SE COR. OF
SEC. II, T8N~ RI3W~ SM.
1566'N B :383'W
FROM THE SE COR. OF
SEC. II, T8N:Ri3W, S.M.
LAT.- 60047'44.839"
LONG.- 151° 29' 45. II 2".
E£ODET/C CO0/:FDIN,4 TEE
LAT.- 60°47'45.:368'' LAT.- 60047'44.768"
LONG.-151o 29' 4:3.942" LONG.-151°29' 42.~899"
LAT.- 60°q7'44.244''
LOI',IG.- 151° 29' 44.154"
, 1.I Ii :
,: [?P. AVFH !,'! lt.A. 13. ~ scALE I:' I000'
t, u' t'-'~. T~ '~ ~'""'--"- ' '-
~ ~:,~:c::-~ ~' ~.,,.,-: ~i SHELL 01:-~. ,.,~,,;':rv'"~'"'-'~'A:q T , -,
.. · . ':~.,~? -~,-~-~,-~.~'~ ....... ~~.
· LOCATION,. OF ....
STATE OF ALASKA
ALASN,,~' OIL AND GAS CONSERVATION COM~SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown []
Alter Casing [] Other []
StimulateX[] Plugging [] Perforate [] Pull tubing []
%
2. Name of Operator 5. Datum elevation (DF or KB)
Shell Western E&P Inc. ~ 116' DF
3. Address 6. Unit or Property name
601 West 5th Avenue, Suite 810, Anchorage, AK 99501 Middle Ground Shoal
4. Location of well at surface Platform A, Leg 4, Conductor 28.
@ 1564'N & 378'W from SE corner of Sec. 11, T8N,
At top of productive interval R13W, S.M.
At effective depth
At total depth
7. Well number
A 24-01
8. Approval number
7-143
9. APl number
50-- 733-20258-01
10. Pool
"G" Pool
Feets
11. Present well condition summary
Total depth: measured
true vertical
10,900 ' feet Plugs (measured)
feet
Effective depth:
measured
true vertical
feet Junk (measured)
10,613'
feet
Casing Length
Structural
Size Cemented
Measured depth
True Vertical depth
Conductor
Surface
Intermediate
Production 2,010'
Liner 10,888'
13-3/8", 61#, K-55
7" 29# N-80
2100 sx
2010'
10888'
Perforation depth: measured
9766-10534' 9 intervals
true vertical
9090-9445'
Tubing (size, grade and measured depth)
3-1/2", 9.3#, N-80 EUE 8rd @ 9888'
Packers and SSSV (type and measured depth)
Unipacker V!! @ 9846'
leaned out w/1 gal
12. Stimulation or cement squeeze summary
10,609.
Intervals treated(measured) @ 10,300' pumped 25 BBL 1% NH4Cl
20 BBL 1% NH~tC1
Treatment description including volumes used and-final pressure Perforated @ 9,979'
9.999' 1;0 10:025'.
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
At~,ska 0ii & Gas Cons. Commissi.'m
FR26L/10 BBL water ~ 10,268-
followed by 153 BBL EDTA &
, 9,983', and
Tubing Pressure
Prior to well operation
Subsequent to operation
101 47 5O0 80
109 79 490 80
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Form 10-404 Rev."12-1-85
JHF/0428
Title Production Superintendent
Date 5/8/87
Submit in Duplicate
DAILY JOB SUMMARY
DATE: 4/15/87
WELL NO.: A24-01
OPERATION: CLEAN OUT, EDTA ACIDIZE, AND PERFORATE HR-HZ
NOTE: DRIFTED WITH 2.5" DRIFT TO 10250' ON 4/15/87.
07:00 RU ARCTIC COILED TUBING AND HALLIBURTON.
08:20 HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL.
12:50 DISPLACED DIESEL DOWN FLOWLINE FROM ARCTIC AND
HALLIBURTON.
13:40 PRESSURE TESTED TO WELLHEAD TO 5000 PSI. RIH CTU.
13:50 BEGAN HEATING MIX WATER FOR EDTA WITH STEAM COLL.
TEMP 55F
16:45 TAGGED FILL AT 10268'(KB). CIRC. WITH 1 GAL HOWCO FR26L
PER 10 BBL FILTERED INJECTION WATER. 1BPM@ 500 PSI.
CIRCULATE OUT FILL TO FLOWLINE.
17:45 UNABLE TO CLEAN OUT BELOW 10609'. TEMP OF MIX WATER
80F. INCREASED PUMP RATE TO 2 BPM @2800 PSI. NO GO.
20:00 WELL STOPPED LIFTING. ATTEMPTED TO BUMP WELL.
CIRCULATED FILTERED INJECTION WATER TO DISPLACE HOWCO
GEL. WOULD NOT LIFT. LOAD IS 320 BBL WATER.
23:50 DISPLACED TUBING WITH 70 BBL DIESEL.
Alas',(a OJ~ & Gr~.s eons, Co,. .... ~
DAILY JOB SUMNARY
DATE: 4/16/87
WELL NO.' A24-01
OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ
01:00 WELL BEGAN LIFTING WHEN DIESEL DISPLACED WITHIN TUBING.
WITH END OF CT ACROSS FROM PERFORATIONS,WELL WOULD NOT
LIFT. DIESEL APPEARED TO BE IN3ECTED.
01:45 COMPLETED PUMPING DIESEL.
02:05 BEGAN MIXING 120 BBL EDTA AT 32#/BBL.
03:32 TITRATED FIRST SAMPLE EDTA. APPROX. 24#/BBL. ADD
ADDITIONAL EDTA.
04'45 RE-TITRATED EDTA AT APPROX. 30#/BBL.
05:00 WITH END OF CT AT 10300' MIXED AND PUMPED 25 BBL
NH4CL IN FRESH WATER. FOLLOWED BY 153 BBL EDTA AND
20 BBL 1% NH4CL.
08:45 CASING ANNULUS PRESSURE GRADUALLY INCREASED TO 2200
PSI. BASED ON THE IDEAL GAS LAW WHERE (PVl)=(PV2).
THIS IS AN INDICATION THAT ALL OF THE TREATMENT WAS
CIRCULATED INTO THE CASING AND WAS NOT INJECTED INTO
THE FORMATION. MAXIMUM INJ. PRESSURE ON TUBING WAS
1200 PSI.
10:00 COMPLETED DISPLACEMENT. WELL WOULD NOT LIFT.
12:15 DISPLACED TUBING WITH DIESEL. WELL BEGAN LIFTING.
14:20 POH CT. TOTAL LOAD IS 518 BBL WATER (INCL. SPENT EDTA)
AND 140 BBL DIESEL.
16:15 RD CTU AND HOWCO.
DALLY JOB SUMMARY
DATE: 4/29/87
WELL NO.' A24-01
OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ
07:00 RU DRESSER ATLAS. RIH WITH 24' GUN AND ATTEMPT TO
PERFORATE THE HR-HZ ZONE. TAGGED FILL AT 10,498'
POOH WITHOUT SHOOTING.
13:00 RIH AND SHOOT TWO TEST SHOTS AT 9,979' AND 9983'. PLACE
WELL ON TEST. NO CHANGE AFTER 12 HOURS IN RATE OR CUT.
POH.
DAILY JOB SUMMARY
DATE: 4/30/87
WELL' A24-01
OPERATION: CLEAN OUT, EDTA ACIDIZE, PERFORATE HR-HZ
07'00 RIH WITN 26' 2 1/8" SILVER JET GUN LOADED 4 JSPF.
PERFORATE 9999 TO 10025' (HC-HD(I)). NO INCREASE IN
PRODUCTION NOTED.
March 6, 1987
Shell Western E&P Inc.
601 West Fifth Avenue · Suite 810
Anchorage, Alaska 99.501
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99502
SUBJECT: SUBMITTAL OF APPLICATIONS FOR SUNDRY APPROVAL FOR MIDDLE
GROUND SHOAL WELL NUMBER'S A 24-01 AND A 33-14
Gentlemen:
Enclosed are two Applications for S~
on Middle Ground Shoal well numbersi
for upcoming workovers
and A 33-14.
The stimulation and reperforation on A 24-01 is scheduled to begin on
March 12, 1987.
The coil tubing unit acid treatment on A 33-14 is scheduled to begin
March 13, 1987.
Each Application is submitted in triplicate.
For further information contact Susan Brown at (907) 263-9613.
V.e~y tr ly yours,
Manag~ Regulatory Affairs
SBB/kka
Enclosures
Oil & Gas Co~$. Anchorage
SBBE/aogcc.3
STATE OF ALASKA
ALAS"~,~OIL AND GAS CONSERVATION coIVrt~SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [~ Pull tubing [] Amend order [] Perforate X3 Other []
2. Name of Operator
Shell Western E&P Inc.
3. Address
601 West Fifth Ave., Suite 810, Anchorage, AK 99501
4. Location of well at surface Platform "A", Leg 4, Conductor 28
@ 1564'N & 378'W from SE corner of section 11, T8N, R13W,
At top of productive interval S o M.
At effective depth
At total depth
5. Datum elevation (DF or .KB)
116' i.. RKB feet
6. Unit or Prop. erty name
Mididle Ground Shoal
7. Well n~[n~_O1
8. Permit number
73-38
9. APl number
50-- 733-20258-00
10. Pool
"G" Pool
11. Present well condition summary
Total depth: measured
true vertical
10,900'
feet Plugs (measured)
feet
Effective depth:
measured 10,613' feet Junk (measured)
true vertical feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented
2010' 13-3/8" 61# K-55 2010'
10,888', 7", 29#, N-80, 2100sx @ 10,888'
measured
true vertical
9,766'-10,534'
9 intervals
Measured depth
Tubing (size, grade and measured depth)
3-1/2", 9.3#, N-80 EUE 8rd @ 9,888'
Packers and SSSV (type and measured depth)
Unipacker VII @ 9846'
True Vertical depth
RECEIVED
MAR .... 9 1987
Alaska 0ii & Gas Cons. Commission
Anchorage
12.Attachments
Description summary of proposal [] Detailed operations program [] BOP sketch []
13. Estimated date for commencing operation
March 12, 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foreg.oing is true and correct to the best of my knowledge
Signed ~~/~~ ~- ~ ..~~' ~_~-.-_~ Title Prod~lct, i Olq Su peri ntendent Date
Commission Use Only
Conditions of approval
',
Approved by ~, [.~j~¢~ ~_ .~JJ'JJ' ,¢
Form 10-403 Rev 12-1-85 --~""'~
FORMS/ROSWO. 1
Notify commission so representative may witness I Approval No. ~ ~.~.!
[] Plug integrity [] BOP Test [] Location clearanceI
~ommissioner the commission Date
Submit in triplicate
PROGNOSIS
A24-01
OPERATION: 1.CIRCULATE OUT FILL WITH COILED TUBING UNIT.
2.STIMULATE HK-HN WITH EDTA.
3.RIO DOWN AND TEST WELL UNTIL STABLE.
4.PERFORATE HR-HZ THROUGH TUBING.
TUBULARS' 3 1/2",9.3#, TO 9888'
I
7" 29~, TO !0888'
PERFORATIONS' ON WELL DIAGRAM
REFERENCE LOG' SOS COMPLETION LOG 5/25/85
STATUS: 100 BO - 56 BWPD INJ 979 MCFPD 2.-'14/87
~!~ ~ ~!~a EDTA IS A VERY OOOD CHELATING AOENT. WHICH
MEANS THAT ANY ION (CALCIUM,IRON OXIDE,ETC.) IT COMES INTO
CONTACT WiLL BE ABSORBED DEPLETING THE EDTA SOLUTION. IT IS
CRiTiCAL TO GET FULL STRENGTH, UNCONTAMINATED EDTA TO THE
FORMATION FOR THIS STIMULATION TO BE SUCCESSFUL. ALL TANKS,
MI×IXG VESSELS AND LINES BE CLEAN PRIOR TO MIXING OF ANY
CHEMICAL. FRESH WATER WILL BE USED FOR ALL MIXING. DO NOT
USE FILTERED INJECTION WATER DURING EDTA STIMULATION.
PROCEDURE
].RU COILED TUBING UNIT AND PUMPING EQUIPMENT. PRESSURE TEST
ALL SURFACE LINES TO SWAB VALVE TO 4200 PSI WITH ]" HIGH
PRESSURE LINE FROM OFFSETTING INJECTION WELL. RIH WITH HIGH
PRESSURE WASH NOZZZLE SECURED TO ] 1/4" COILED TUBING WITH
ALLEN SCREWS OR SWEDOELOCK CONNECTION. ~AXIMUM ALLOWABLE
SURFCACE PRESSURE DURING JOB WILL BE 4200 PSI.
CLEAN OUT
2.CONTINUE GAS LIFTING WELL. AT 10,000' BEGIN ClRCULATINO
WITH 5,/1000 GALLON HEC OR EQUIVALENT O~; ~XED !N FILTERED
INJECTION WATER Al 0.5 BPM. ATTEMPT TO CLEAN OUT TO AT LEAS?
10600' OR DEEPER IF POSSIBLE. KEEP WELL L!F!ING. IF WELL
c EIVED
DIES, DISCONTINUE PUMPING AND ALLOW WELL TO UNLOAD. E
EDTA TO BE MIXED I~ FRESH WATER WITH 1~ NH4CL.
Alas~a0,~ GasCons. Commiss}0~
TO SPEED ~P THE MI×lNG PROCESS, THE MIXING WATER A~D Anchorage
ADDITIVES WILL BE PREHEATED TO ]50 F PRIOR TO ADDING THE
DISODIUM EDTA. EDTA ADDITIVES TO BE DE?ERMINED BY LAB
COMPATIBILITY WORK USING WATER AND OIL SAMPLE FROM A24-01.
FILTER ALL FLUID THROUGH 2-3 MICRON FILTER FOR REMAINDER OF
JOB.
BE PREPARED TO PUMP'
PRE-FLUSH: 25 BBL ]% NH4C1 MIXED IN FRESH WATER
EDTA
:120 BBL 35* DISODIUM EDTA/BBL 1% NH4CL
MIXED IN FRESH WATER. CORROSION INHIBITOR
AND EMULSION BREAKER.
FLUSH · 25 BBL 1% NH4Cl M!XED IN FRESH WATER
3. WITH END OF COILED TUBING AT 10300', DISPLACE PRE-FLUSH TO
EOT. WHILE RIH AT 7 FPM, PUMP PRE-FLUSH AT 0.8 BPM. DISPLACE
ALL CASING TO 10550' WITH 1% NH4CI. FOLLOW PRE-FLUSH WITH
EDTA SOLUTION. WITH EOT AT 10550', SHUT FLOWLINE AND BEGIN
INJECTING ED?A INTO FORMATION AT 0.8 BPM. MOVE EOT BETWEEN
!0550-10300' UNTIL ALL EDTA IS DISPLACED INTO FORMATION.
DISPLACE EDTA INTO FORMATION WITH 25 BBL FLUSH. POH.
4.0PEN FLOWLINE AND PLACE WELL ON TEST. CONTINUE TESTING
UNTIL LOAD IS RECOVERED AND PRODUCTION STABILIZES.
DETERMINE FILL DEPTH
5.BEFORE CALLING OUT SERVICE COMPANY MAKE $LICKLINE DRIFT AND
DETERMINE FILL DEPTH. IF FILL IS ABOVE 10580' ZONE CAN NOT
BE PERFORATED.
6. LEAVE WELL IN TEST THROUGHOUT PERFORATING OPERATION. RU
PERFORATING COMPANY AND'PRESSURE TEST LUBRICATOR WITH 1" LINE
FROM OFFSETTING INJECTION WELL TO 2000 PS1. RIH WITH WELL
LIFTING. PERFORATE THE FOLLOWING INTERVALS 4JSPF WITH 2 1/8"
BAR GUN USING REFERENCE LOG BOTTOMS UP:
10688-698'
10646-672'
10607-6!0'
!0587-591'
10549-573'
HAVE PRODUCTION OPERATOR MONITOR WELL AND TAKE CUTS BETWEEN
RUNS.
7.RD PERFORATORS. PLACE ON TEST WHEN PRODUCTION STABILIZES.
DATE- ~ -- 3 ---8"'7
COMPLETIO?: EQUIPMENT DETAIL SIIEET
MBS A24-01
2/19/87
8
9
10
11
12
13
NO. ITEM
APPROXIMATE
TVD. MD. PSI OR
1. OTIS BALL VALVE
2. CAMCO KBM MANDREL
3. CAMCO KBM MANDREL ~2
4. CAMCO KBM MANDREL #3
5. CAMCO KBM MANDREL #4
6. CAMCO KBM MANDREL ~5
7. CAMCO KBM MANDREL
8. CAMCO KBM MANDREL ~7
9. CAMCO KBM MANDREL #8
10. CAMCO' KBM MANDREL ~9
11. GUIBERSON UNIPACKER VII
12. OTIS "X" NIPPLE
13. GUIBERSON SHEAR SUB
CA',.:
13 3/8", 61~, K-55 ~ 2010' w/? sx
?" 29#, N-80 ~ 10888'w/2100 sx
PBTD = ?
TD = 10900'
284 284
2339 2364 3000 3/36
3979 4454 990 3/16
5362 6133 980 3/16
6328 ~243 970 3/16
7065 8063 3040 3/4
~480 8520 1030 1/4
7802 8887 1020 3/4
8103 9256 1000 1/4
843~ 9627 OR 3/8
8590 9846
86~ 9877
8625 9888
TUBING
3 1/2", 9.3¢, N-80 EUE 8RD ~ 9888
PERFORATED ZONE
GROSS INTERVAL
HC-IID
HC-ItD
tlE-HF
Ill-IlK
tIK-HN
IlK-liN
IIN-IIR
llN-IIR
9966-10026
10050-10091
10113-10133
10187-10215
10245-10295
30306-10366
10390-10475
30500-10534 '
Maska Oil & Gas Oons,
7~ I 7~
7~
if..../-,,,/..,
,,
.t
SCHLUMBERGER OFFSHORE SERVICES
A Division of Schlumberger Limited
HOUSTON, TEXAS 77001
' JUNE 7 ,.1985 .-=A.E .=~Lv rD
RD.
/__/ANCHORAGE, ALASKA 99502
ATTN: BETH CUZZORT
SHELL WESTERN E&P INC.
P.O. BOX 527
HOUSTON, TX.... 77.001
Attention: LOG FILES, WCK 4147
Gentlemen:
Enclosed are 1BL prints of the COMPLETION RECORD
Company SHELL WESTERN E&P INC. , Well .[~C,S A ~4201
Field. MIDDLE GROUND SHOAL ., Coun%, KENAi ~ ' ~tate ALASKA
on:
,
Additional prints are being sent to:
1-BL prints
SHELL WESTERN E&P INC.
P.O. BOX 527
HOUSTON, TX. 77001
ATTN: BRIAN TEPPER,WCK 1128
1 RFOLDED,.SEPI'A~ .... '~----~ ~>~-'..
~T~ATE' OF, ALASKA ~
/ALAS~ OIL & GAS CONSERV~ION CO~.
{3001 PORCUPINE DR. // ~
k ANCHO~GE, ALASKA 9~01
2BL nrints
SHELL WESTERN E&P INC.
601W.FIFTH AVE;SUITE 8!0
ANCHORAGE, ALASKA 99501
ATTN: TIM PUTNAM
1MYLAR
1BL nrints
ARCO ALASKA INC.
P.O. BOX 100360
ANCHORAGE.~ ALASKA 99501
ATTN: JOHN C. HAVARD
1BL nrints
SHELL' PLATFORM "A" OR "C"
C/O SHELL KENAI OFFICE
NORTH STAR ROUTE #1
P.O. BOX 485 WIK RD.
KENAI, ALASKA 99611
~,prints
1RROLLED 'S'EPIA
P.O. BOX 107839
ANCHORAGE, ALASKA 99510
ATTN: J.L. WEAVER
The film is. RETURNED TO SHELL
We appreciate the privilege of serving you.
prints
DATE:
'"
Very truly yours,
SCHLUMBERGER OFFSHORE SERVICES
DAVID RWROL
DISTRICT MANAGER
April 9, 1985
Shell Western E&P Inc.
601 West Fifth Avenue · Suite 810
Anchorage, Alaska 99501
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99502
Gentlemen'
Please find the enclosed Notices of Intention for our Middle Ground
Shoal wells #A24-01 and #A13-12.
The work will be commencing later this week (around April 18th), so an
approval is needed quickly.
If there are further questions, please contact Susan Brown at (907)
263-9613.
Thank you for your consideration in this matter.
Very truly yours,
D. L. Yes land
Sr. Staff Environmental Engineer
Pacific Frontier Division
SBB/kka
Enclosures
SBBA/a ogcc6
STATE OF ALASKA
ALASK~IL AND GAS CONSERVATION C~'/MMIsSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL tX1 OTHER I-1.
2. Name of Operator
Shell Western E & P, Inc.
3. Address
601 West Fifth Avenue, Suite 810; Anchorage, Alaska 99501
4. Location of Well
At Surface: Conductor 28, Leg 4 of Platform A @ 63.45'S
and 56.79'E of Center Leg I @ 1627'N and 435'W of
SE Corner. Sec. 11, T8N, R13W.
5. Elevation in feet (indicate KB, DF, etc.)
ll6'RKB
I 6
. Lease Designation and Serial No.
AD1 18754
7. Permit No.
73-38
8. APl Number
so- 733-20258
9. Unit or Lease Name
Middle Ground Shoal
10. Well Number
A24-01
11. Field and Pool
Middle Ground Shoal
mIG" Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate ~] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Please see attached prognosis for details.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ·
The space below for Commission use
Title ProduCtion Superintendent
Date 4-9-85
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
P~ognosts
Log .n~2~rfo.te
Htddle Ground Shoal Fteld
STATUS: kiel1 gas ltfttng Z86 BDO (38S cut).
PROPOSAL: Run GR/CCL log. Reperforate non-watered out zones.
#E~I~ DETAILS: See ettacheg schemttc.
PROCEDURE::
!.
4p
1
S.
Rig up wtreltne, Test lubricator to 3500 pst, Pull ball vtlve,
~ke drtft run to PBTD, Tag and reco~ any ft11. POOH and rig
dram wtrellne,
Rig up Skis with lubricator and grease Injection head. Pressure
test lubricator to 3000 pst,
Run GR/CCL log from PBTD to 9,go0'. POOH. Develop log Ind
telecopy to Houston for recommnded per,or&ting depths.
Perforate selected tnterva]s (to be supplied) .~tth 4 hole. s per foot
ustng 2-1/15" Hyperjet ho11~ carrterun (o' phased) end
positioned with a mgnet. Depths wtllgbe referonced from
Schlumberger DIL dated 4/13/74.
Keep vel1 "-gas 11fred down" while perforated, eHaVe, well shut
When teols are tn tubing going tn or out of ho1
then place tn test
Rig down SKIS.. Produce well for 12 hours
sep~r&to~ for 12 hour test.
APPROVED: DATE:
TSB:Jc
TSB50882
RECEIVED"
APR ~ O) 1.985
Alaska Oil & Gas Cons. Commission
Anchorage
III
I I
A 14-01
Jt~I ~scrtmtton
2 Otts kll Valve 284
Camco KIN Nandrel IK 3/16 1000# 1364
3 ramco J )bndrel BK 3/16 ggOt 4454
~co I ~K~I IK 3/16 I70f 7a43
~o I ~nd~l IK 1/4 10~l ~3
I 7 ~o I ~ndrIl IK 1/4 1030t BS20
8
~o ~ ~nd~l BK 1/4 1020/ ~7
~ ~o ~ ~nd~l BK SIIS ortftce J256
I0 ~o ~ ~nd~l ~ H27
11 ~t~rson ~i~cker Vii G~6
12 ~tl X Ntpple 9877
13 ~t~on shear sub 9~8
3 1/2 9.3f/ft. N-80 £UE 8 round
2033 ND 13 318 61g/ft. 0-55 Buttress
Liner
10888 ND 7" 19t/ft. N-80 Buttress S.C. Co111rs
Perfs.
~966
1OO26 ~'HC-HD
10050
10091
10113
10133 ~ H£-HF
10167
10215
10245
10286~
1O3O6 HK-HN
10366
103g0 10434.1
1O475 ~ 10464J
10600 #N-HR lOSlS'J
10534 lOSZ4d
10613 bottom tagged 1-25-76
10790 PBTD
RECEIVED
~nchorage
HN-HR Frick Interval
HR-HZ Frick lntervll
10888 7" N-80 2Or/ft. Castng
hge 44
Shell Oil Company
200 North Dairy Ashford
P. O. Box 527
Houston, TX 77001
July 13, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Gentlemen'
In response to the July 1 letter from The Commission's Mr. William Van
Alen, we enclose a complete history for Shell's West Mikkelsen Unit No.
4 well. The well's mud log was transmitted under separate cover last
week. The requested reports of production tests, including time
intervals, quantity and description of recovered fluids and pressure
data were included on the Well Completion Report (Form No. 10-407) which
was sent to the Commission on June 3. A separate page of the Well
Completion Report Form was submitted for each of the four production
tests. No drill stem tests were performed.
Also enclosed are the following routine reports'
le
Sundry Notices - Subsequent Reports for Middle Ground Shoal Wells
A12-01, A42-11, A43-23, C23-23, C44-14, A43-11, A42-14, and
e
Monthly Report of Drilling & Workover Operations for Seal Island
Well No. BF-47 #1.
Yours very truly,
R. G. Hollis
Manager Production Administration
Pacific Frontier Division
RGH .mh
Enclosures
E£E VEO
JUL 2 ~ ,*'**
Alaska 0il & Gas Cons. "n ............
STATE OF ALASKA
ALASK/~'t~IL AND GAS CONSERVATION CO'~IMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator
Shell Oil Company
3. Address
John las, P.O. Box 4500, Kenai', AK 9'9611
4. Location of Well ..
Conductor 28,. Leg 4 @ 63.45"S & 56.79'"E~frem-Center Leg 1
@ 1627'N & 435"~ from S'E Corner Sec. '11',' T8N, R13W.
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
116' D.F. ADL 18754
7. Permit No.
73-38
8. APl Number
50- 733-20258
9. Unit or Lease Name
MiddlP Ground Shoal
10. Well Number
A 24-01
11. Field and Pool
Middle Ground Shoal
IIGII
~ Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation ]~ Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
June 10, 1983 - Rig.ged up Oti's and Dowell. Pressure tested eauipment to 5000 PSI.
Tagged bott @ 10601" Pumned 1000 Gal. P-20. POOH to check for
plugged jetsOm '~-20 ~00 C~al. . .
. Pumped ), HCL 10% (11000 Gal ) 2000 ~al
HF-HCL 1½-7½%, 1000 Gal. HCL 10%. Disnlaced tbg with 17 BBLS diesel.
POOH.
14. I hereby)~rtify that/the foregoing is true and correct to the best of my knowledge.
Signed Title Manager Prod. Adm.,.
The space below for Commission use
Date 7/13/83
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
STATE OF ALASKA ~
ALASKA"bI1' AND GAS CONSERVATION C"OW(M ISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER
2. Name of Operator
Shell 0il Company
3. Address
John .Oouolas, P.O. Box 4500, Kenai, AK
99611
4. Location of Well
Conductor 28, Leg 4 @ 63.45' S & 56.79'E from center Leq 1
@1627'N & 435'W from SE corner Sec. 11-T8N-R13W
5. Elevation in feet (indicate KB, DF, etc.)
116' D.F.
I 6
. Lease Designation and Serial No.
ADL 18754
7. Permit No.
73-38
8. AP! Number
~o-~133-20258
Unit or Lease Name
Middle Ground Shoal
10. Well Number
A 24-01
11. Field and Pool
'Middle Ground Shoal
"G" Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] ~ Perforations
Stimulate ~ Abandon O St imulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other I--1 Pulling Tubing
(Note: Report multiple compietions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
[]
[]
[]
t3. Describe Proposed or Corrlpleted Operations (Clearly state all pertinent details and give pertinent dates, including estimated data of starting any
proposed wcrk, for Abandonment see 20 AAC 25.~05-170).
See Attached.
RECEIVED
Alaska 0il & Gas Cons. ~mrnrnissle~
14. t hereby certify that,the foregoing is true and correct to the Oest of my knowledge.
Signed ~/~ ~ ~ Title Prod. Admn.
The space below for Commission use
Oate 5/18/83
Conditions of Approval, if any
I
j Approved by.
8¥ [ONNIE C, SillJ
Approved
By Order of
COMMISSIONER the Commission
Form 10403
Rev. 7-1-80
Submit 'Intentions' in Triplicate
and "Subsequent Reports" in Duplicate
COILED TUBING ACIDIZATION
A 24-01
W.H. ROOM /t4
CONDUCTOR ~/2.8
MIDDLE GROUND SHOAL FIELD
KENAI, ALA~' KA
Status:
Objective'
Currently producing 2e~ BDO (30% cut) from the
HC through HR Zo~e~.
Stimulate pro{!/~ ',~.. ~ ~nbers by acidizing with
coiled tubi ncj,
Mechanical Details' See attached schematic.
Proc,edure'
1. M.I.R.U. wireline and lubricator. Test lubricator to 3000
psi. Pull ball valve.
2. R.I.H. with gauge' run. Clean out tubing as necessary to
bottom. Tag and record bottom. P.O.O.H. Rig down wireline.
Note' Shut well in at surface 12 hours before acid job to
allow well to bUild up.
3. M.I.R.U. coiled tubing and Dowell acidizing equipment. Test
lines, tree, and coiled tubing to 5000 psi. Test hydraulic
, system and B.O.P. Tubing and lines should be filled with
diesel. Filter all fluids through a 2 micron filter.
4. R.I,H. with coiled tubing (no more than 100 FPM). Tag
bottom and record depth.
5. Pump following acid treatment'
'Staqe Fluid Quantity/
1
2
3
" 4
P-20 Solvent
10%' HCL w/additives
7½ - 1½% HCL-HF w/additives
10% HCL w/additives
1000 gal. (24 bbls)
1000 gal. (24 bbls)
2000 gal.(48 bbls)
lO00 gal. (24 bbls)
Pump treatment at 1/4 bbl/min, and move coil tubing uphole to
treat entire interval (9,966' - 10,534') during each sta_qe of
treatment. ' RECEIVED
MAY I
Alaska Oil & Gas Cons, .Gommtsl~lon
Anohor~l~
6. Displace acid to end of tubing with diesel and pump an~additional
5 bbls of diesel to flush coil. P.O.O.H. with coiled tubing.
7'. Bleed off gas column and slowly return well to production. Test'
well daily until stable.
TSB
RECEIVED
Naska 011 .& Gas Cons, [,ommisslon
DATUM 38'
'A 24 - Ol
COMPLETION DETAIL 6-17-74
.
·
· . Item # Descr'i pti on
~ _ .
2.
3.
4,
5.
6.
7',
8.
lB.
ll.
12.
13.
,.
·
-,
:..
. .
' PERFS.
· 9,966
'10,050 ' HC-HD
'10,091
'.10,113
'10,133 ] HE-HF
10,187
10,215 ] HI-HK
- 10,245
'
' 10,306 HK-HN · 10,366 ~
284 . ..,.,
2364
4454
6113 · '. '"
7243 '
8063 ' , · '.
8520 . .-"
8887 .... '.
Otis Ball valve
Camco KBM Mandrel BK 3/16 lO00#.
Camco'KBM Mandrel BK 3/16 990#
Camco KBM Mandrel BK'3/16 980//
Camco KBM Mandrel BK 3/16 970#
Camco KBM Mandrel BK 1/4 1040#'
Camco KBM i.,an~ ;"~'.~'i BK 1/4 1030//
·
Camco KBM ~,~L~ BK'I/4 1020#
Camco KBM
Camco K[~M . Dummy
Otis X Nip~ ~: ,
Guiberson shear sub
BK 5/16 orifice 9256
· 9627" '
. .
9888't.":". "" :"-,.
Tub i ng Deta i 1
'1
.-',
..
.
, ,
3½ 9,3#/ft, N-80 EUE 8 Found ? ".'.: ..... ... "' '" ';
"" Casing .Betail "'..-' '~'. '.'..'i..',.' ..'":"..':"i.~'·I ": :".
· .
,,
2033MD '13 3/8 61#/ft. J-.B5 Buttress· :.:. I ' ' ~
· . ' " ': ":""..."~ ".' 'i"~.'.-, '.'":' 'i'~..
Liner -' '"'::'""~':'"'~"'; "'t.','~.,'"'.'"',·.' ':".' t'::,')'
10,888MD 7'! 29#/ft, N-80'~Buttress S,C. Collars ";..., ?.....'-.
·
....
10,390
' 10,475 ~1
'i 10,500 HN-HR 10,515 '
10,534 10,526 ] HR-HZ Frack interval
F
I 1~,613 bottom tagged 1-26-75
, ,9o ·
10,888 7" N-80.?~/¢f
RECEIVED
· a.l~ gil ·& GaS Cons. L, ommis~rOn
~0,434
10,46~, ] HN-HR Frack interval
O. K' (~[lbxeth, ~~~. NB~t~r 14, 1977
She~ ~ ~ "A" 24-01
.=
. ~
Drlg. Permit No.~.,_
Opera tor
Satisfactory Type Inspection
Yes No Item ( ) Location,General
( ) ( ) 1. Well Sign
( ) ( ) 2. General Housekeeping
( ) ( ) ~. Reserve Pit-( )open( )filled
( ) ( ) 4. Ring
Safety
Valve
Tests
0<) ( ) 5. Sur'face-No. Wells
(~') ( ) 6. Subsurface-No. Wells /
( ) Well Test Data
( ) ( ) 7. Well Nos. , , ,
( ) ( ) 8. Hrs. obser , , ,
( ) ( ) 9. BS&W ,--,--,--
( ) ( ) 10. Gr. Bbls.
, ,
( ) Final Abandonment
Alasl,.a Oil and Gas Conservation Committ
Field Inspection Report
Well/Platfm Sec ' T R M
· ,
Represented by~__~ ~ ~-~ Name & Number2~>ll'./~_~/~/~.-.~.'--~,~.~.j
Satisfactory Type Inspection Yes No Item ( ) BOPE Tests
() ()
() ()
() ()
() ()
() ()
() ()
() ()
().()
() ()
() ()
() ()
() ()
() ()
15. "Casing set @
16. TesL fluid-( )wtr.---]-~ )mud ( ) oil
17. Master Hyd. Control Sys.-~psig
18. N2 btls. ,__,__,__psig
19. Remote Controls
20. Drilling spool- "outlets
21. Kill Line-( ) Check valve
22. Choke Flowline ( ) HCR valve
23. Choke Manifold No. valvs fl~s
24. Chokes-( )Remote( )Pos.(-~dj.
25 Test .Pluo-( )Wellhd( )csg( )none
26. Annular Preventer, 9siu
27. Blind Rams, psi~-
( ) ( ) 11. P&A Marker ( ) ( ) 28. PiPe Rams ~psiq
( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psig
( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psi¢
( ) ( ) 14. Pad leveled ~ ( ) ( ) 31 Safety Floor valves--Y(- --)-BV ( )Dart
Total inspection observation time~)/days Total number leaks and/or equip.
fa i 1 ures t~/(9~/~
Remarks.
cc:~/~ ~JF~J~'~otif~ ~~daYs
S H ELL OIL COMPANY
SHELL BUILDING
1008 WEST ,SIXTH STREET
LOS ANGELES, CALIFORNIA 90054
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention Mr, H, L, Burrell
TELEPHONE 482-3131
Gentlemen:
Enclosed for your information are the completion data for ®ur Shell-
Atlantic-Standard Middle Ground Shoal A-24-1 well· Included are the following:
1, Completion Report (form P-7)' in duplicate.
2. Well History
3, Two sepias and two prints of all electric logs·
4. Directional Survey.
Very Truly yours,
3DM:MJ
N G McKim
·
·
Division Operations Engineer
Enc lo sure s
cc - Atlantic Richfield Company (w/Enclosures) - Standard Oil Company of California (w/Enclosures)'
- Amoco Production Company (w/Enclosures)
- United States Geological Survey (w/Enclosures)
- Files (w/Enclosures)
jur, l 2 o i~74
[/{ill:II [ ) I 7 ~ ~ SUBMIT IN DIe'CATE*
STATE OF ALASKA ~SeE-other :n-
structions on
OIL AND GAS CONSERVATION coMMITTEE re,,e:'~e s~de:
iiiii i iii ii i i
_
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
' [] ' [] U] '
TYPE OF WELL: on, ~AS
W El.I, w ELL DR ¥ Other
b. TYPE OF COMPLETION:
W E[,I, OV ER E N BACK RESVR. Other __
NAME OF OPERATOR
Shell 0il Company
A~DRESS OF OPERATOR
1008 West Sixth Street, Los Angeles, California
4. I,OCaTION OF WELL (Report location clearly and in accordance with any State requirements)*
xt~,,~c~.Cond. 28, Leg 4 @ 63.45'S & 56.79'E from center leg 1
@ 1627'N & 435'W fr. SE coP. Sec. 11, T8N, R13W
At top prod. interval reported below
3675' N & 2494' E from surface
At total depth
4113' N & 2286' E from surface
13. DATE SPUDDED [14..DATE T.D. REA. CHED [15. DATE CO,NiP '
2-15-74 . [ 4-12-74 [ 4-22-74
10,900 (9486) 10,S00 (9399) ~ow~-~¥, ao~b~oons
. ,900
22, PRODUCING INTERVAL(S), OF THIS COMPLETION--TOP, BOTTOM, NAME (MD AND TI;D)*
10,434-10,524 (9086-9163) G Pool
24. 'FYPE ELECTEIC AND 0THEi% LOGS'RUN
5. API NUMERICAL CODE
50- 133--20258
6. LEASE DIgSIGNATION AND SERL~L NO.
ADL 18754
7. IF IND1A.N, ALLOTTEE OR TRIBE NA_M~
None
8. UNIT,FAt~M OR LEASE NAME
Middle Ground Shoal
9. WWX,L NO.
MGS A-24-1
10. FIELD A2qD POOL, OR WILDC'AT
MGS Field, G Pool
11. SEC., T., R., M., .(BOTTOi~I HOL~
OEKIECTIVE)
26. LINER lqlgC OI{.D
SIZ]D [ TOP (MD) I t~OTTOM (AID) SACKS CEMENT*
[
[
·
i ii i ii i iiiii i i i
28. PERFORATIONS OPEN TO PRODUC4I'IO1~l (intcrval, size and number)
1/ft. @ 10,515-10,524'
1/2 ft. @ 10,434-10'464'
1, T8N, R13W, S.M.
12. PER1VIIT NO.
73-38
-- lI~. ELEVATIONS (DF, RKB, aT, GR, ~PC)*ll7. ELEV, CASINGHEAD
DF 116'
INTERVALS DRILLED BY
CABLE TOO 1.,8
23. '~VAS DIRECTIONAL
SURVEY MADE
Yes
,i
I ;~A/IOUNT PULLED
Dual Induction Laterolog, Sonic, Density, Cement Bond Log
· i -- i Il i l
~. CASING RECORD (Report all strings set in well)
DEPTH SET (1VID) I I-IOLI{I SIZE
CASI2{G SiZE WEIGHT, LB/FT, ]~ GR,ADg [ ' CF-aIILNTING RECOP~
" 7" ~ i 29 10,898' 9-7)'8 2100 sacks
27. TUBING RECOP~D
none
none
SC}%EEYN (MD) SIZE
DZP~ SET (MD, [ PACI;~R SET
9894' ' i 9840
29. ACID, SilOT, FZA~CI'URE, CE~,IENT SQUEZZE, ETC.
Dla,~/l[i INTF_~V_4J~ (MD) AMOUN'£ 2~ND KIND OF MA~I~EZIAL USED
30. PRODUCTION
DATE FIRST PIIODUCTION I Pl%ODUCTION MEIIiOiD (Fiowii]g, gas lif~, pumping--size and type of pump) IV;ELL STATUS (Producing or
~' T BIN
Ow, U G ICASLNG PRESSURE lCALClYLATED OIL--BBL. M ; I ~ f ' l
32, LIST 0~I ATTACHMmNTS '
2 sepias & 2 prints of logs, well history, well survey, core records
' 33. I hereby certify that the foregoing and attached information is complete and correct as ~termined from all:available records
i1[i ~ i ii
*(See Imtructio~s ~8 Sp~ces [or Additional Dmo o~ Reverse Side)
INS ~ RU~. ~ I~ONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lan:Is and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
mentsgiven in ether spaces on this form and in any attachments.
Items 20, and 22:: If this well is completed for separate preduction from more than one interval zone
(multiple completion), so state in item 20, and in item 22 show the prcJucing interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report
(page) on this form, adequately identified, for each additional inte, val to be seperately produce,-'/, show-
ing the adkJitional data pertinent to such interval.
I~,m26: "Sacks Cement": Attached supplemental records for this well shoul:J show the details of any mul-
.,
.
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produc~l.
(See instruction for items 20 and 22 above).
34. SUMMARY OF ~'O~VIATION TESTS INCLUDIN(; INTERVAL TESTED. PHESSURE DATA A_N'D ~OV~l~ OF OIL GAS.
35. G~GIC MARK~
WA~ AND MUD
~ ~ '~'- 8112 '
.~:~ ~~ E Pool 9270'
<.~ c_ F Pool 9663' 8434'
?~..~.~..-~: >.:? ~ G. Pool 9965' 8689'
" ~a~' 6hn.~ mayA. Aqn'ACll BRIEF D~CgtP[~O~S O~ LITI[OLOGY. POnOSITY. FRAc~R~. APP~T ~8 ... ._
Core No. 1: 10,410-10,468', recovered 58' )
Core No 2: 10,468-10,486' recovered 17'
· , ( see attached core record
Core No. 3: 10,486-10,523', recovered 22.5')
..
......................................................
PD 4A {Rev. 5-63) Printed in U.S.A.
Middle Ground Shoal
, ,
Cook Inlet, Alaska
(~OUNTY}
DAY DF..PTHe
,
~, 'lfRO~l I , TO
Surface Location: Conductor 28, Leg 4, Platform A. 'Conductor 28 at
63.45' South and 56.79' East from center Leg 1 at
1627' North and 435' from Southeast corner of
Section 11, Township 8 North, Range 13 West, S.~.
Elevation: D.F. 116' (above MLLW)
February, 1)74 Spudded 7:30 A.M. 2-15-74. Drilled and surveyed 17-1/2" hole to 2011'.
15-19 317' 2011' Circulated hole clean.
Surveys:
Depth~ Deviation Bearing Depth Deviation Bearing
400 3 o N12E 968 32 o N34E
430 4 ° N45E 1032 33 ° N34E
466 5 o 15' N59E 1122 32 o N34E
497 6 ° 15 ' N55E 1245 32 ° N34E
528 7 °45 ' N63E 1432 32 ° N33E
559 9 ~ N51E 1651 32 ~ 30 ' N31E
595 11 ~ 15 ' N56E 1722 30 ~ 30 ' N42E
710 16 ~ N42E · 1809 29° N45E
806 22 ~ N34E 2011 29 ~ 15 ' N43E
~0-21 ~// Ran 50 joints of 13-3/8", 61f~, K-55, Buttress casing with shoe at 2010',
fillup collar at 1973'. Circulated hole clean. Pumped 10 bbls. of
fresh water ahead of 2000 gals. of pre-flush (Halliburton WD-7) followed
by 10 bbls. clear water. Mixed and pumped 2350 cu.ft, of 96 pcf slurry
class G cement blended with 10% gel, followed by 200 sacks class G neat
118 pcf slurry. Displaced with 1730 cu.ft, mud. Lost returns after
displacing 1000 cu.ft. Bumped plug with 1500 psi-float held okay.
Opened D.V. collar at 1000'. Circulated hole, had 200 cu. ft. cement
returns at surface. Circulated until clean. Pumped .10 bbls. water
ahead of 200 gals. of pre-flush (Halliburton WD-7), followed with 10
bbls. water. Mixed and pumped in 900 cu.ft. API class G cement, 118 pcf
slurry, mixed with Inlet water. Displaced with 910 cu.ft, mud. Closed
D.V. collar with 1800 psi. Lost returns while displacing through D.V.
collar. Did not get any cement to the surface. Tested casing head
with 2000 psi-okay. Flanged up B.O.P.E.
,
CONDITION AT ' ~ . OF PERIOD
, ,
· ,z= ~o. TO 13- 3/8'" 2010 '
17-1/2 317 2011'
_
Dm~P~ 4-1/2" 16.6f~
~D 4A.(Rev. 5-63) Printed in U.S.A.
~-~ ~"~ wl~ ,o. A- 24-1
i i iii i
Middle Ground Shoal DRTT.T _TNG RBPORT Section 1
(FIJ~I,.D) ' ' ~L~)~, ~,I~,~OD ~'%]Z)~G ' ' (iI~GTION On. L/.&Ill)
_ _Cook Inlet, Alaska March 29, 1974 T8N~ R13W~ SM
(COUNTY) ' " '
(TOWNBHIP OR t~ANCHQ)
DAY DEPTHS
REMARK8
Febr~,ary., 1774
22 " 2Ol1' Mixed 125 sacks of class G cement. Displaced with 1" pipe hung at 145'
in the 13-3/8" x 17-1/2" annulus. Had good cement returns to surface.
Ran bit, drilled out D.V. collar at 1008'. Drilled out float collar at
1963'. Tested casing, pipe rams and Hydril to 1500 psi. Drilled out
cement and shOe at 2010'
23-25 2011' 3763' Drilled and surveyed 9-7/8" hole to 3763'. Stuck drill collars while
surveying at 3749'. Unable to work free. Spotted 140 bbls. diesel,
in stages, attempting to work pipe free.
Surveys:
,Depth Deviation · Beari~ng Dep_th Deviation Bearing
2134 29 o 15 ' N43E 3134 28 °30 ' N42E
2344 30°45 ' N42E 3352 28 o N39E
2607 30 o N42E 3573 26045 ' N38E
2917 28 °30 ' N45E 3751 27 ° N33E
2/26 ~?~3 Circulated and conditioned mud. Ran Dialog free-point indicator.
thru Found pipe stuck 2120'-3749'. Circulated and conditioned mud. Backed
3/1/7Z pipe off at 1987'. Chained out of hole. Made up 7-5/8" O.D. washpipe,
safety joints, jars, four 7'~ D.C.'s and ran in hole. Recovered all
drill pipe and 2 stands of heavywall drill pipe. POH. Made up 9" O.D.
washpipe, safety joint, jars, two 7"x30' D.C.'s, 9-7/8" stabilizer,
two 7"x30' D.C.'s, 9-7/8" stabilizer. RIH. Unable to wash over fish.
Pulled out, redesigned shoe. Ran in and freed fish. POH. Made up
a~lJ ran drilling assembly.
M_a.-ch, 19 74
2-29 3763' 9746' Directionally drilled 9-7/8" hole to 9746'.
Surveys:
Depth Deviation Bearing Depth Deviation Bearing
3785 27 o N33E 3895 27 °30 ' -N45E '
3815 2 6 °30' N34E 3959 28 o N46E
3845. 2 6 o N38E 4115 28 o N47E
3875 2 6 o N43E 4333 27045 ' N48E
CONDITION AT end 0~'
H01.1S ' c~$~No s,zE I DEPTH
,,z, ,.o. 7o 13 3/8" 2010'
17-1/21 317 20]'1
9-7/8 2011 9746
_
mmn~mm 4- 1/2" 16 6#
G! ZE~?-- '
,, . ..... ,,~ , , ,.. .. .,,,. , .',
PD 4A (Rev. 5-63) Printed in U.S.A. ~ O~lr~ (~O~p~'
~-~
Middle Ground Shoal DRIVING REPORT
(FIELD)
, Coo~, Inlet, ~laska April ~, 1976
w~u..o, A- 2 4-1
Section 1
(IEGTiON OR LIRAS/,)
~8~, R1,3W~ SM
DAY DEl=THE
REMARKI
· FROM I TO
[ i iiI illlI
Ma~ch, 1974
2-29 qT~z~ Surveys:
Depth Deviation Bearing Depth Deviation Bearing
-4516 30 °45 ' N49E 7845 26 o 30 ' N14E
48 68 33 o 15 ' N47E 7985 26045 ' N12E
5110 33 o N48E 8159 25 o 30 ' N06E
5395 33° 15 ' N48E 82 37 2 3 o 15 ' N16E
5645 34030 ' N48E 8304 22 o 15 ' N22E
5862 35 °30 ' N49E 8372 22 o 15 ' N22E
6112 34 o 30 ' N49E 8431 2 3 o N20E
6225 30030' N49E 8523 27° ~ N14E
. 6421 31°30 ' N46E 8759 29° 15 ' N08E
L 6580 32 o N47E 8866 30 °45 ' N04E
6875 31 o N44E 8959 33 o 30 ' N02E
7028 29° N42E 9002 35° due N
7254 27030' N41E 9119 35030' N01W
7568 24°45 ' N28E 9623 34° 15 ' N08W
7651 25030' N23E 9744 33°30 ' N09W
7754 26°15' N19E
30-31 9746' 10,225' Directionally drilled 9-7/8" hole to 10,054'. Ran Schlumberger DUal
Induction-Laterolog, run 1) 10,054'-2,011'.
Survey:
Dept.h Deviation Bearing
10,054 32000' N16W
Lost one cone off bit.
Apr il ~ 197~
110,225' Waiting on parts to repair rotary clutch.
Survey:
Depth Deviation Bearing
10,225 33000' N18W
2 10 225 10,235 Repaired rotary clutch, reamed 10,135-10,225' milling on lost come
CONDITION AT end OF
i-iOLE CASINO size DEPTH GET
i
_
,
~ S,Zt ,,, FRO~4 TO 13-3/8" 2010'
17-1/2 317'2011'
9-7/8 2011'.10235
mmLL ~m~ 4- 1/2"- 16.
GIZES - ,_ ...... -, .... ,
,~ '
PD 4A (Rev. 5-6'3) Printed in U.S.A.
~ZA O~-. ~O~4~ANY
'~ ~'~ ws~.o A- 2.4-
Middle Ground Shoal DR JTTNG R PORT Section 1
........ (FIELD) _ EO~, ~)~.,~C~ ~T~Z~G ' (.I;GTION OR LEAII0
Cook Inlet, Alaska April 20, 1974 T8N~ R13W, SM
-' ' i i i , , , i i i i i
(cOUNTY) (TOWHIHIP O!~ RAHCHO)
DAY DEPTHS
RF. MARK8
_
Apr'il, 197+
3-5 t0,235' [0,460'~ Drilled to '10,410'
I . Ran Christenson core barrel with 9-7/8"x5-1/4"
diamond bit. Core ~/1, cored 10,410-10,468'; cut 58', recovered 58'.
6-8 10,460' [0,562'i Core ~2, cored '10,468'-10,486' ; cut 18', recovered 17'
Core ~3, cored 10,486'-10,523'; cut 37' recovered 22
, · ·
Drilled 10 523'-10,562' changed out rotary table sprocket
9-12 [0,562' 10~900'~ Directionally drilled 9-7/8" hole to 10,900'. Conditioned mud for logs.
(T.D.)
Surveys.
Depth Deviation Bearing Depth Deviation Bearing_
10,776 31015' N28W 10,900 29°30' N32W
13 10,900 Ran Schlumberger: Dual Induction-Laterolog, run 2, 10,875'-7,000';
BHC Sonic, run 1, 10,862'-7,000'; GR-FDC, run 1, 10,838'-7,000'·
PML tool failed·
14 PBTD 10~800 Cemented 7" casing at I0:888' with 2100 sacks·
Ran 260 joints of 7", 29f/, N-80 Buttress casing with special clearance
couplings, equipped with plain cement guide shoe at 10,888' and fillup
collar at 10,800' Centralizers placed at: 10,004', 10,045' 10 088'
· , , ,
10,170' 10 254' 10 297' 10 383' 10 420' 10 546' 10 589' 10 672'
, , , , , , , , , , , , , , ,
10,714', 10,801', 10,844', 10,883'. Mixed and pumped in 2100 sacks
API class G blended with 0.5% Halad 9 and 0.6% CFR-2. Bumped plug with
2000 psi.
15-16 PBTD 10,800=Nippled up. Tested tubing head to 3000 psi. Changed to 3-1/2" pipe
rams. Tested blind rams to 2000 psi. Ran bit and scraper in on 3-1/2"
tubing. Found top of cement at 10,790'. Conditioned mud. Tested Hydri]
to 1500 psi. Ran Schlumberger GR-CBL-CCL log 10,756"-8,800' at 0 psi.
Pressured to 1000 psi, re-ran log.
17 PBTD 10,800 Conditioned hole to 10,790'. Ran temperature survey on piano wire line
between 10,750' and 100'
18-20 PBTD 10,800 Attempted to run Schlumberger CBL log through 3-1/2" tubing-tool failed.
Pulled tubing, attempted to run Schlumberger 4" CBL-Sonde-tool mal-
functioned.
,
CONDITION AT end OF
.... HO~ CASINO siZE DE~H
, ,
· ,z. ~.~- .~ 13-3 " 2010 '
0,sss'
9 7/8~011' 1090~
......
DRILL. PIPE
GIZE~ ,
, , ,, ,,
/ SIGNED
PD 4A (Rev. 5-63), minted in U.S.A. ~ O]/, COM:P.~g~ A-24-1
/'% ~ wilt, NO.,
Middle Ground Shoal DBTTJT.TNG RBPORT Section 1
(FZi~LD) ~/0~, ~J~3~OD ~Z~TO (81,GTlON OR I,.1~110 ....
Cook Inlet, Alaska April 22, 1974 TSN, R13W,
(COUNTY) · (TOWNIHIP OR
DAY DEPTHS
' FAOH I _ TO RF, MARKI
·
Ap~i!; 1974 ·
18-20 PBTD i0,800~ Loaded out Schlumberger. Rigged up Dresser-Atlas, ran CBL-CCL 10,755'-
8,600' at zero psi and at 1800 psi. Ran in tubing, displaced out mud
with filtered injection water. Displaced out water with diesel.
Pulled out..
20 PBTD 10,800' Ran 3-1/2" tubing equipped as follows: Guiberson shear sub at 9894';
Otis Q nipple at 9882'; Otis X nipple at 9871'; packer at 9840'; KBM
mandrels at 9554', 9122' 8784' 8327' 7599' 6378' 4656' 2510' and
, , , , , , ,
Otis ball valve nipple at 283' Set packer at 9840' landed tubing
· , ·
Ran temperature survey on piano wire unit 10,700'-100'. Removed B.O.P.5
Nippled up wellhead.
21-22 PBTD 10,800 Tes~.ed wellhead to' 3500 psi. Installed flow line. Gas lifted out
335-~ bbls. diesel· Rigged up Dresser-Atlas. Shot one jet per foot
10,515'-10,5'24', using 2.5" Jumbo Jet Bar Gun. Tubing pressure in-
creased from 520 psi to 540 psi. Shot one jet/two feet at 10,434'-
10,464'. Tubing pressure 645 psi, casing pressure 620 psi. Placed
well on gas lift. Released rig 8:00 A.M. 4-22-74.
CONDITION AT end OFP~'RIOD
,,. . B
· m,, r.o. '~o 13- 3/8" 2010 '
_
17-1/2 317' .~ 01]~ ' 7" 10,888'
9-7/8 2011' 10900'
DRILL PIPg
SIZES
.... . , .. , / ., , , .,,
/ - ~/' IlONF-.D
PD ,~
) PRINTED IN U.S A. - ~'
WEEK ENDINO___~T~]L 6: 1.97&
10,Al. 0' 10,A68'
CORE FROM TO
Lennon, McLeh.~ney
CORES EXAMINED BY_
SHELL ~,L CO~tPANY
CORE RECORD
AREA OR FIELDMi----ddle Ground Shoal
COMPANY_ Shell. Oil Co
MGS A-24-0!
LEASE AND WELL NO
TO RECOV- FORMATIONAL. STRUCTURAL AND PROBABLE PRODUCTIVITY DESCRIPTION OF CORE
ERED
0,468 58' Used Christensen convention~.l core barrel with diamond bit 9-7/8~ x 5~~t
ligh~ massive, lo---'--~,'er fine 'grained, moderate sorting, poor P&P.
~Grgins are ~u~rtz, feldspar, plus other dark minerals. Clay filling
Pebbly .s~n~, light-dark gray, massive, lower fine to ~ebbles, pebbles common
.... t~' ~", rare to 1" clay filling, poor to no P&P. Dark minerals make up
about 1/3 of sand. Very hard, well consolidated. Not c~lcareous
. ,
omerate light-d~rk gray, massive, hard, medium grains to pebbles to ~"
dominantly Qu~rtm,gr~nite, bas~t, etc. Poorly sorted, qusrtz cementing (
or heavily cl~y bonded ·
Pebbly S_qnd, light gray, massive very h~rd, medium grained ['o ~" few pebbl
'' '~o l", poorly sorted, ~uartz (?)cementation or heavily clay bonded, poor
Conglomergte, light-dark gray, m~ssive, very hard, medium grains to pebbles
2-3"(one @ 10620.5' is as large as core, basalt), poorly sorted. Some
wLth fetrty well sorted conglomerate pebbles to%". Cementing ~s above.
Poo'-P&P.
Fair st.~in, fluorescence, _cj{t 'and cut fluorescence 10418.5-A28-+'
__
Foo~' to no show~, lO~.A28-A38~~'- F~ir shows 10~438-443~.
Pebbly s , dark jr~¥, foir!v friable, medium gr~ined sand with well rounded
f - ' ..
pebbles ~ - 3/. , moder~.e sorting,massive, poor P&P, grading to below
~ ~ ray massive, very herd, medium grains to 2-3"
Conglomerate, li.~h~-dark g ,
pebbles, poorly snrted, heavily ct~y filled. Poor P&P.
P~bblv sand_, dark gray, massive, fairly friable, medium grained send with
rounded pebbles ~ - 3/4", poor P6~.~.
Congl_omerote, light-d~rk gray, massive, very hard, medium grain to 2-3" pebbl~
~u.~rt? cementing(?) heavily cl. ay filled, nil P&P
Pebbly Spnd, light gr,~y, f~irly friable, thick bedded medium grain with ~ - ~"
oebbles, some carbonaceous material (some to 3/4" long), clayey, poor
Cmnzlomer~qte ~s at 10,.~51.5~10,458.5'
DiP
CORE
INDICATIONS
OIL-- GAS
CORE OR DITCH
fluor, cut
flu'or, cut
~t Stl~, >
t
uor
'luor, cut
:S
%,.or, cut
~luor, cut
fluor, cut
Notes: l) See attached fo~ sho'., description
2) Special s~mples t~ken @ 10,460-46l'; 10,455.5-456.5';
1.0, 4l 7-&18 ' .
· I~.I~2749 ~fRev. 9-62)
· Printed U.S.A.'"
Dine April. 6, 1974
Type Side'~all Sampler Cnnvention~! Core
Cores Examined By Lennon, McLehaney
SHELL Oli ;OMPANY
West Coast DIVISION
-"o;u~_-';~,~.'~'u. CORE RECO~D
Core ~ I: 10,410-468'
Section
Area or Field Middle Ground Shoal
Well MGS A-24-0l
, , I , I IJ J I ,,, , I I Ill ii , Ill I I j , , ,, Il ' ' '
DEPTH REC R~JN DESCRIPTION ~'LITH OIL SHOWSe~
SYMB
Sample Oil Fluor.] c.t I Summary,
' % Hydro- Color Color $ho~
Oil corbon of of Cut No.
.. Stain Odor % Int~no Coior Cut Fluor. Avg.
10,All_ ...... ~{1 s'taining was '{ight tan, where prese~'t was gen'- ........ 3- ' ~ .... 2 2 YG 1.5 2 "
10,413 er8lly distributed throughout 3 3 '2 2 YG 1.5 2
10,Al7 L.0a ~.0~ 2 2 YG 0 l
10,A19 2 2 2 2 YG 1.5
z.;~! ......... ~3 3 ---2 2 Y 1~)5 2,
[0, .-
10,A24 2 3 l 2 G 0
1 0,426 1 3 l 1 G 2 2
10, A29 . 0 0 0 0 .... O 0
!0,&32 0 0 0 0 0.5 l
10,438 0 .0 0 0 0 0.5
10,44l 3 3 2 2 YG 1.7 2
l O,..-:, 4. ~ .. . 3 3 ? ? YG. ? 2
!0,&46 3 3 2 2 YG 2 2.5
10, ,~[~8 0 0 0 O. ~0 ~ ,~0
-FO'-' 451 3 3 2 I'~ ~. ~
10,A54 2 2 2 2 YG 1.3 1.5
1.0, A57 3 3 2 2 YG 2 2
10,460 3 3 2 z ~ 2 2.5
I0,A62 3 3 2 ~ 'fG 2 2.5
10~ -,'.-6 ~ -~. 3 3 2 2 YG 2 2
10,&63 ' 3 3 2 2 YG 1.b'
,Ill I I I I I I
eLith. Symbol, % sand: C,0-5%; 1,5-$0%;Z, :50-65%;:5,65-85%; S,85-t00%. amSee Legend for Oil Shows (over)
PD 4
RECOV-
ERED
.,pRINTIrO INU.S.A.
WEEK ENDING~ ~D',~'{1.. 7,~ 1.97[,.
CORES EXAMINED BY_~II~ }'[C~here';
SHELL-O~L COMPANY
CORE RECORD
FCRMATIONAL, STRUCTURAL AND PRO~3ABLE PRODUCTIVITY DESCRIPTION OF CORE
AREA oR FIELD-Middle Ground Shoal
COMPANY_Shell 0'[l Comp~ny
~);.
LEASE AND WELL
CORE
INDICATIONS
OIL-- GAS
CORE OR DITCH
U-ed Christensen conventional core b~rrel ~,ith Diamond bit 9-7/8:'x 5.~" ·
Conglomerate, %ighr-.dark gr~y, massive, very hard, medium gratns to 2-3" pebb,
he.,vi!y cl~y filled, nil P~. L{ght spotty st~in and fluorescence. Sharp
transition to b~low. Not c~!careous
S~nd, light bro,,n, m~sstve, f~irl7 fri~ble, medium gr~ns, moderate sorting,
~l~y bonding, fPir to poor P&P. Some ~on~s with scattered pebbles up to .3
~ ~t 10,&70.5'. Abundant fine c~rbon~ceous material. Some bI~edin$ qf
oil ~.~hen' f~rst removed from core b~rrel.
~e~.b.].y s~nd, light gray, ~s~ive, hard, medium grain with many pebbles
heavily clay bonding, poor
p~ib.bly .s~n~_ 8s shove with very large irregular c~rbonaceous particles; with
pebbl..s becoming more 8bund.~nt
Conglomera~?, light-d~rk gr~y, massive, h-rd, medium gr~ins to 3" pebbles,
poo:ly sorted, he~v ly clay bonding, ~uartm cement~.ng(?), poor to nil
Pebb!y s,~nd, light army, h~rd, medium gr~ined with m~ny pebbles to ~'~ clay
bonding, mbund~nt carbonaceous material, poor
Cong!omeret~, light-dark grmy~ mmssive, hard, medium gr, ned, to 1" pebbles,
"h~avtly clay bonding, abundant carbonaceous m.~tertal, poor to'nfl P~.
Notes: l) See attached for show description
2) Special sample taken at 10,671-472'.
fluor, cut
fluor, cut,i
fluor,
-&77'
fluor,
cut
cut
cut
L.~[-2749 ..(Rev. 9-62)
· P'~fnted'" O.S.A~ .... SHELL OIL ;OMPANY .. .
·
West Co~st DIVISION
Da?e April 7, 1974 ................ 'Section I Tt~p, 8N
' ' ' SIDEWALL CORE RECORD
TYpe Sidewall Sampler' Conventioncl 'Core ............ Area or Field ..... Middle Ground Shoal
Cores Examined By Lennon, McLeh~ney
Core #2: 10,468-10,486,
Well MGS A-2&.-O!
..... LJL . ,I . [ ! . I Ull I I II Il I Il ~ 'LITI~ III I I l
DEPTH IRECRUN DESCRIPTION Oil SHOWSe~
SYM~
r'~~' Cut /$ umm:ryI
..... ' ......... ' ......i ....~ample Oil Fluo
._
% Hydro- Color Color ~' ,-
Oil carbon of of Cut No,
,, , . ~Sloin Odor % Inten. Color Cut Fluor, ~ S"
10,468 All core wae 'stained, where shown, with light tan 1~o6 a! 1.6~' 2 2 YG 1.3' '1o5 --
lO,Z~70 staining 3 3 ' 2 2 Y 2 2
!0,57/,. ~........ ~ ~ 2 ~ yC 1.5 1.5
10~476 0 0 0 0 0 0.5
!0,477.-~ 1.0 a 3 2 2 YG 1.3 1
i0,47~ 3 3 2 2 G L.3 1.5
10,481 3 3 2 2 YG 1.5 1.5
10,483 . 3 3 2 2 YG 1.7 1.5
,,
,
,
eLith. Symbol,% sand: C,0-5%; 1,5-50%;Z,30-65%;~,65-85%;S,85-I00%. ~=See Legend for Oil Shows (over}
~'""~"' SHELL OIL_ COMPANY
U?5.A. "~ -
?'~ AREA OR F;ELD ~zd.~le
' .. CORE K CORD co.. ·
EXAMINED BY ~e~o~ }~c~ehe~e7 ( "HEAVY" OIL PROVINCES) LEASE AND WELL NO
· "OIL SATuRATIoN OBSERVATIONS
I ' ' VISIBLE OIL
c3 Rock type, color, stratification hardnesl and cohesion, other features, e.g., fossils, cements, ....... .
n' clay occurrences, carbonaceous material, dip, odor (oil/HzS) grain size (range and predom, size), ....
b./ , SAMPLE LIQUID OIL ' STAIN ~ COLOR COLOR OF SHOW LITH.
FROM TO
O silt and clay content, sorting, groin shape, est. of porosity, perm., and saturation. DEPTH STR~NGERS OR ONLY. OF CUT AND SYMBOL SYMBOL
~j GLOBULES A.M.S.~ FLUOR. NUMBER
n' A.M.S.~
10,486-487 1 Conclomerate~ light-dark gray, massive, hard~ medium grain to 1"
pabb[~s~ poorly so,tad, heavy c1_e¥ bond~ng~ poor to nit ~&~
sharp contaat w£th below. ~ot
0,487-487.5 0. S_~d, light brown, thickly bedded, f~irly h~rd, upper fine to medium lite uniform ~t~in, fluor.
grain, moderate sorting, clay bonding, not calcareous, poor P&P
[0,487 5-488~ 5
1' Pebb~ly..s~.nd~, light gray, thickly bedded, very hard, medium green to ~" no show~
pebbles, abundant carbonaceous materiel, moderate sorting, heavy
clay bonding, poor
'.0, ~,881.5-508.5
~0' S?nd, light gr~y, massive, very hard, lower-upper fine grain~ well
sorted, abundamt carbonaceous material, silty, heavY clay
bonding, poor P&P. No Shows, except as noted below.
@10,490: As ~bove with light spotty stain & Fluorescence, fairly
friebl e, with some tocnl patches with no shows
~i0,A94: As ebove but with even light ste!n & fluor. Increases in carbonaceous m~teriel
appears finely laminated with c~rbonmceous on bedding planes
@1n 4.07: As ~bove but a 6" mon~ with no shows
@I0,&97.5-499.5:.. As above with light stain & fluor.
@10,&99.5-502: , As above with no shows.
@1~,502-508.5: kAs above with light stain & fluor.
Note: 1) Cc,re fractUred along bedding planes (?) 35° to 40°.
2) S[.eciml s~mple taken @~I0,490-A91'
3) SSe attached for shows.
$'¢~-~'3t.,: ~;-~:~.&~, (~m~ $~'&t.F. [Sa. NO O-*5"k.I. I-CL~.Y OR SHALE: WITH SAND STREAKS (SAND 5-Z5%). 2~CLAY OR SHALE: A/~D SAND {~AND 25-60%). ~-SAND WITH SHALE b'TREAKS (SAND 60-DO%), S-SAND (90-100%).
' -'~ ~'"'" (Rev. 9-62)
I.~Z ~-, z,/~
Prin~ed ~ U.S.A. SHELL OII~"OMPANY
West ~o~st DIVISION
Dote April 8' !974 ..... Section ~L T~.~p. 8]~1 R,qe.
SIDEWALL CORE .RECORD
Type Sidewall Sampler Conventional Core .... ---:~;~;'~--':"'~=~ ...... uv-~ .......... '------ Area or Field Middle Ground Shoal
13W
Cores Examined By Lennon~ McLehaney
Core #3:10,486-10,523' Well MGS A-24-01
DEPTH RECfRUN ' DESCRIPTION '~ LITH OIL SHOWS~
SYMD
I I I Il I 1 i ' I l
Sample Oil Fluor. Cut Summ~ry
% Hydro- Co~or Cotor Show
Oil carbon of of Cut No. Shcr~
........ Sitoin Odor % lnten. Color , Cut . Fluor,
1.0,486 ~tain, where noted is very IiRht tan 3 3 2 2 YG 2 2
10,487.5 3 3 2 2 YG 1.5 1.5
10,488 ' 0 0 0 O ' O O
10,491 alternate l~yer8 of sand with no shows amd sand wit!
light t~n ~in~n~ & fluor 1.6~ 1.6a 2 2 Y 1.2 1
t0,494 3 3 :2 2 YG 1.5 ..... 2.'
10,497 0 0 0 0 0 0
~.. z,o? 5 ~ q 2 2 ¥ 1.7
ltq, .... ,, ,
10,500 0 0 0 0 0 0
10,503 3 3 2 2 ¥ 1.5 1
, ,
,
, , ,
,
¢~Lith. Symbol, % sand' C,0-5%; 1,5-30%;Z, :50-65%;:5,65-85%; S,85-100%. ~See Legend for Oil Shows (over)
COMPL. DATE ................ ....
SHELL OIL COMPANY
WELL ........'~..:..~....~'../. ' · .....
FIFLD ........... : ......................................
/ · C.! ........ ~ i ' ~ ' ' ' r ...... '~ ' j -- '
.... I ! ' ' / ' : / ' """" '
,,f z ~ ~o + oo z'-:,,l~. 4-zq, ,9 z,,..,,~ ,.v ff..s' ,~':" I,.zf7 /, ,e7 , : . Ss,...'~.:..',(... L:~:,o.,:.. !
,,,,'",. '~' ,._ L..-],'""' ~.~-,~C" ,~,~<.'G..., 11 '~. ,Z'V: ',v' s~, b: / ? o z,~-~ ~ :.~,sz ~,,:~,.t,,/
-'r / /, , '".......~ '"' ! ..... .l" "':"'"'. '~. :,~ I i i .... ' '- . .... ~ ' ...... ,.. . ......
' ..... : ' 'i , 41 . ~ ~r
.......... I .......... '--: ............. I
: :.? -.. : ....,-,: ...,. ,, '. ~,-....., ~,.. ! ~ ,r.. :.,v !..:, ,~ .. ~,o: ',,., · '. . , ,-/,'..,,';,o '-,~o '
_,._ _ .,, :, .,,..~,,,.... ....,.,,,.. , .... _ .. ?? , ~ ,, . ,~
· ." / '-'" ..-.> ":' // '"' ' . .'"'.~..-"'( .... 'I . '.. . , .."- ' "" ~ . . - i " ~. ! ...... '
,_7 ...... ' ',, , - , , i ..... ._ , '~ " ~'~]
o 0 ,.. ~ ,: Z ' ".,. ." .. i ' i ...... '.'I .. - i ......
[.: . ~ ~ ,~.g !,,~ u.,, : i~ "'- , , ? . , .... ;,- ,. , , , ~ ' .., . ~. .-~.,~
tLP [J / ~ '~ L - · ~ f ~t , . '. ' , ! , ~ ..... t ............... - '
/r>~z: ~ 4' .~--: ':"-~ :' '-' ' ...... .
· ;,~.,7?~Z$ff ,~'f.~ A/ 3~t ~- ~.fo ;..,;.,fir/ _/!,~,z7 t~¥,')~
...... '" ~
,
_ , .
.,',:/-'.', / ?'~ 3Z ,,,."D l:F,Z:,_".ck',:[,'~z,,.%,..x'£': ?",'~':f.I/ 3J'5 /: ~11 [3,~.7 :,F'/,,"/~
..... · ...:', ..... ~ - J ~' .. , , ~ '
t~'V z 17 :::,_. .?~ t~,-l.?o ,.747,< !i1~?,~,7 ...v' 3/ £ ./,.,~,~!,, ~,~.~t .~.:~-~-.~1 ~'~/,TZ_!'
.'~ ,2 ',z't . -" ~ , , , . .
1 -,
..... '- z:' z,o,)'.t :o,.:, ~ ,:,,'iF.,.,,'.. ;,' J
/? o ,,r, v 7 i -/[,, ':?,:,.9'o,",~z.. .4... ,, Z >,./.. ./,:., ~ ,,/. 9...3 ,
,, ,..' Z? r';,a e.., . ,,= . .... , ~ .. l
" .'/ I .,,,o ;
--/.,,,i/ zoo. ~_ ? /s- i75, z¥ /~.z ?..6 ff..c: // /,,: :--- 7~..~ ~7.~z.- ~ :/z,//
,, ,
,, , ,,
,.'-',::,1,) i'~","Z c :.~ :,t ."'.,e'-.s'.F-' ,~.:,,. ,,.,,. r ',," :! 12 ~ 3 :. : j · ' ; I '
' .... ' ' '' ':l ....... i " "
........ { ~ " ': i ~ "' '
...... ,.,, I _ i ,.',
t l I. , II !' ,,.tI
,, ,
. .,., CO:,'~PUTED ~,Y ,../. p .,4.;,
I' . C~ECr, ED BY _
· H,, ...... , , ........ ~ ..... . ....... ,,~ ! ~ ~ .1~ ,,, : ' ' ' ''' ...... .. .- .]-~mm-:---~:-
'.ELEv, .[..' ~. ~',
SPUD 'DATE.....z'.7./.?..'...7...?'. ....
COMPL. DATE ....................
SHELL OIL COMPANY
WELL .... ~......z. ~..-,.. / ........ : ...........
Fl ELD ,./..¢..~f~..~....~.C..°. ~. ~..d....-~..~?.
~,~. ~:o~..,~,,~.,o~ v~,,~o, w~,,~o, ',.~.°.~,o, ~?~ ~T~ ~ ~ co-o~ .....
~'~~,~,o~~'~"°~ v.~,c~~°~
.~ _ ~ _ ,,,, .... , ,,,, J ,. ,,,
~ . I .' "~ ~ , ......
-
,,
'~'
, ,,
...... ~ ....... ~' '2 ...................
3~/ S~ 7 o
,,.,
,,
_
~ t /~: ~. ' .......
,,, ,,-
~g~/~.../..~3~o ~/rT,~7 :~,~) ~,~7 ~ g? ~ ¢~'~ ~'~ ..... t~5~Z*'~
zt~ ~ 220 ~.
" ....... "
~[.
:.~L-~ 2 ~'7 ~5' ':.a /7,%¢6 ~lf,l. fq ,',5,'o! Id ~'['7 ~' 7z,¢7 /~,/c ~..,~?.
' ' C,l,i
~ "
.
CC''~' '*F
CHECKED
~_.: :.. _
'!.
/
'SPUD DATE. ..~'..'../.~. :.7. .~.. ....
COMPL. DATE: ....................
w ,
SHELL OIL COMPANY
wELL ...,,f.~...:.....,.Z...z./. -/' .
F1 ELD.../..4.:~?.~ .... ~5..q."....'::.J....~.~.(..
, ,
Mecsu,e~ ,Ve:s,,rcd ~c~,n,:.~io~ Verticol Vertico~ ,orlzontaI Bb NG ~AI1TUDES ~PARTUR~S 'CO-ORDINATES
D,s~cnce'-VERTICAL Oisfonce N S. I W. N. S. ~.~ W.'
. ,
,
" ,.- '
........
.
"'
b~o ,~q 3z - /~q,[3 5'Tqb, Ty
., . ~,'
/;3 -
, , ,
,. ,
, , ....... _ ~ . , ~"'~ ~'' ' I ' ' , , ~'; -
..........
, , ,
-.,~o--/z,~.S 1~ ~ ...~b 7: ...... ,~.~,z~ '..,~q,'.79 u~.,~t ~ /~, ~" 0o70, ~',ql~ .,z~5,~u, .'~f'~/~z"~ ....
' ,,,
'.:',';',' 7~ z-~ ~: 7467 7zzo,j'l 3o, 7q ~ 1~ Z' z?,6o ~,l/.~~ z7~7,2~] .~oo,~ ! ...~
'
,,
,, ,
. , ,~
.<5:3 ~z...~7 - ;:<.~ 777'ts'/.24 ,I/77 .d i¢ W ./,35 ~ /o./i ~.~,~., - .
~'~.~ / ~. 7 27 .~ o ,' / ~ , ~, ~'
,,
_
~'~ / 2! ~c, ,~'-~" ':7/,9:;~77F/.4f ;-~,',~/~ ~ ~7 ;q,~' 3'.~ ~,'t,t.~? .~::,~,,~'..
, _ ,
~ 77.
,.
' ' COMPUTED
......... _ .....
, ,,,
.
-.- ,u ,
.!
1
,
SHELL OIL COMPANY
wELL ..... ~..':..~.~...'C./.. ..... . .
/ .
Fi E L D ...../~.,.:.~..r../.'[ F....r/~..:.e.~.~/....~ ~ /
Mecsured Measured lnchnotion Vertical Vertical [i'~orlzont~'l! ..... ! ............... i .
I .... BEARING LATITUDES DEPARTURES. CO-ORDINATES
Depth Station FROM Station Depth I: 12eVlQtlon OF .......... ~. ...........
D,sia'nce VERTICAL Distance [i DEVIATION N $. E. W. I N. $. E., W..
,,, ,,,, ...................... ,, , _
, , ,, ~ ·
- ~ , '" , ... , ,,
, , . . ,, ,,
~ ~ - __
COMPUTED BY X~..~'D r~
CHECKED BY
SHELL OIL COMPANY
SHELL BUILDING
1008 WEST SIXTH STREET
LOS ANGELES, CALIFORNIA 90017
AP R 2~:'"'~ i9 7 4
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchor. age, Alaska 99501
i t c. ~~
I I1
I ~ ~;'~°L' ! ~
I 3
,i--,~v .... f-
l DRAFT J
I s~c I
CONFER:
FILE:
i i. ,. ,1
Gentlemen'
Attached are two copies of the Monthly Report of Operations for our
Shell-Atlantic-Standard'Middle Ground Shoal 'A-24-01 well. This report is for
the month of April, 1974.
Very truly yours,
JDM: TB
N. G. McKim
Division OPerations Engineer
Attachment
~,.~Y ! I974
l~w~ No,
REV. 3-1-70
STATE oF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
SUBMIT l~N DUPLICA~
NAME OF OPERATOR
Shell Oil COmpany
3. ADDRESS OF OPE~U~X)R ....
1008 West Sixth Street, Los Anqeles,.California
'4. LOCATION OF WELL
Conductor 28, Leg 4 at 63.45' S and 56.79' E from
center Leg 1 at 1627' N and 435' W from SE corner
Section 11, T.8N., R.13W., S.M.
~: AP! I~U~ERICAL CODE
50-133- 20258
LEASE DESIGNATION AND SERIAL NO.
ADL 18754
? IF INDIAN, ALOTTEE O]~ TRIBE NAME
None
8. L~'IT FARA~ OR LEASE NAME
Middle Ground Shoal
9 WELJ...~o
MGS A- 24-1
- i0 FLF. LD AND POOL, OR WILDCAT
g Pool: Middle Ground Shoal
11 SEC , T., R., I%{. (BO'I'POI~ HOI2~
OBJECrFO~
l, T.8N., R.13W., S.M.
12. PERMIT NO
73-38
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE. CASING AND C~WiENT~NG JOBS INCLUDING DEPT~
SET ~ VOL~ US~. P~O'~TIONS. ~TS ~ ~SULTS FISHING JO~ J~K ~ HO~ AND SIDE-~CKED HO~
~D ~Y O~R SIGNIFIC~T ~~ ~ HO~ ~ITIONS
Report ~for APri 1, 1974
Drilled 9-7/8" hole to 10,410'
Core #1, 10,410-10,468', recovered 58'
Core #2, 10,468-10,486', recovered 17'
Core #3, 10,486-10,523', recovered 22.5'
Drilled 9-7/8" hole to 10,900'
Ran Logs: Dual induction - laterolog, bOrehOle compensated sonic, Gamma Ray -
compensated dens i ty.
Cemented 7" ~29# N-80 Buttress. casing at 10,888' with 2100 s~ks API Class G cement.
Ran Gamma Ray - Cement bond - collar-logs, temperature surveys.
Ran 3-1/2" tubi.ng to 9894', set packer at 9840'
Perforated one hole/ft 10,515-10,524'
Perforated one hole/two feet at 10,434-10,464'.
Placed well on gas lift. Released rig 4-22-74.
Ig74
BtVISION' Oi;' OIL Ai'{D C-AS
sm~ ~ Biv~nn Op~a~nn~ Engineer D~TE
NOTE --Report on ~is fora is required for ea~ OOlendar ~ths regardless of the status of operations, and musf ~ flied ~m oil Grid gas conservatbn commiflee by the 15~ of the suQc~ding ~n~, ~le~ Otherwise directed.
SHELL OIL COMPANY
601 W. 5TH AVENUE, SUITE 810
ANCHORAGE, ALASKA 99501
April 9, 1974
State of Alaska
Divislon of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Gentlemen:
Attached are two copies of the Monthly Report of
Operations for our Shell-Atlantic-Standard Middle Ground Shoal
A-24-01 well. This report is for the month of March, 1974.
Very truly yours,
F~'~ DN~v?;i%K~;erations Engineer
Attachment
Atlantic Richfield Company w/attachments
Standard Oil Company of California w/attachments
U.S.G.S. w/attachments
APR !, 0 ~;A~
ANCHORA6B
No. ~---4
3- 1-70
STATE O, .ALASKA
OIL AND GAS CONSERVATION COMMITrEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WgLL
'& 'NA/~E OF OPEI~.ATOR
OTHER
SUBMIT l~ DLrPLICAT~
SHELL OIL COMPANY
3. ADDRESS ~' O~ERAT~)R ........
1008 WEST SIXTH STREET, LOS ANGELES~ CALIFORNIA
'4 LOCATI'~N OF WI~-T:-L
Conductor 28, Leg 4 @ 63.45'S and 56.79'E from
Center Leg I @ 1627'N and 435'W from SE corner
Section ll, T8N, RiSW, SM.
APl NUiVIEHICAL CODE
50-133-20258
6 LEASE DESIGNATION AND SERIAL NO.
ADL 18754
~ IF INDIA]~', ALOT1-EE O]~ TRIBE NAME
NONE
8. L~.'IT FARA'I OR LEASE NAME
MIDDLE GROUND SHOAL
~ WELL NO
MGS A-24-1
10 FLELD AND POOL, OR WILDCAT
G POOL, MIDDLE GROUND SHOAL
SEC. T., m.. M. (BOTTO~t HOLE
1, T8N, R13W, SM
I,. ~'~T Nd. '
73-38
13. REPORT TOTAL DEPTH AT END OF MONTH, CHA~NGF_.S IN HOLE SIZE, CASING AND CK1ViENT!NG JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND iTESULTS FISHING JOB~ JUNK IN HOLE AND S1DE.'YP~CKED HOLE
A2~D A.NY OTHER SIGNIFICANT CH4%~ES IN HOL~ CONDITIONS
REPORT FOR MIDDLE GROUND SHOAL A-24-1 WELL FOR MARCH,. .19.7_4
Ran Wash over pipe, recovered fish.
Directionally drilled to 10,062'.
Ran Schlumberger Dual Induction Laterolog, run l,
10,026~' - 2,008'.
. ,
~)j~ ~-~'~~,/~,~ ~,.,/~.c/~2//,~ =rnm Division Operatioq~En~r_.m~ . April 9,..%.974
V , -. , ' ' ', '
N0 -- e~or on t is arm is required or ee~ Gelender ~th% regardless of the status of operations, on4 ~uS~ ~ flied in dupli~te with the
oil and gas conservatbn commiflee bythe 15~ of the suQc~ing mn~, ~le~ Otherwiee directed.
State of Alaska
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention Homer L. Burrell
Gentlemen:
SHELL OIL COMPANY
,SHELL BUILDING
1008 WEST ,SIXTH STREET
LOS ANGELES, CALIFORNIA 90017
h~AR 1 1
TELEPHONE: 482'3131
Ic.
---'[ ' 3 GFOL
I ~v I
CONFER:
FILE:
Attached are two copies of the Monthly Report of Drilling Operations
(Form P-4) for February 1974, of our drilli.ng Shell-Atlantic-Standard, Middle
Ground Shoal A-24-1 well.
Yours very truly,
JDM:TB
N. G. McKim
Division Operations Engineer
West Coast Operations Office
Attachments
cc - Atlantic Richfield Company (w/attachment) - Standard Oil Company of California (w/attachment)
- Amoco Production Company (w/attachment)
- United States Geologic Survey (w/attachment)
~AR 1 5 i974
,STATE OF~ ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
I._.
· ~gLL WELL
2. NAME OF OPE~-ATOR
OTHER
qh~l l n.; 1 Cnmn.qn~,
3.-ADDRESS- OF- OP]~A[%"O~ '~
SUBMIT IN DUPLICATE
APl NUMEPACAL CODE
50- ] 33- 20258
6 LEASE DESIGNATION A%'D S'EI~tAL NO.
ADL 18754
IF INDIA]~, ALOTTEE O1~ TRIBE NAME
None
8. L,~IT FARM OR LEASE NAME
Middle Ground Shoal
9 WELL NO
1008 WeSt Sixth Street, Los A.nqeles, California MGS A-24-1
4. I~CATiON OF WELL i0 FLELD AAID POOL. OR WILDCAT
Conductor 28, LeD 4 at 63.45' S and 56.79' E from center ~_ M.a..~.. G Pool
I'~ SEC, T., i~., M. (HOT'TOM HOLE
Leg 1 at 1627' N and 435' W from SE corner Section Il, o~
T,8N., R.13W., S.M.
1 , T.8N.: .R. 13W.
12. PEP, MIT N'O
73-38
13, REPORT TOTAL DEPTH AT END OF MONTH, CHAXG~ IN HOLE SIZE, CASING AND CL'MENTING JOBS INCLUDING DEPTH
SET AND VOLU1VIES USED. PFA~OHATIOlqS, TESTS ANT) RESULTS FISHING JOBS JUNK LN HOLE AND SIDE-TR,ACKED HOLE
A,1NTD A~IY OTHER SIGNIFICAiqT CItAHGES IN HOL~ CONDITIONS
Spudded 7-30 a'm. 2-15-.74,
DirectiOnally drilled 17-1/2" to 2011'.
Ran 2010' of 13-3/8" 61# K-55 buttress casing, fillup collar at 1973'. Cemented with
2550 cU ft API Class G' Opened DV collar, cemented with 900 cu ft API Class G.
Cemented annulus frOm top, with 125 sacks API Class G.
Flanged up BOPE.
Tested casi.ng, rams and Hydril to 1500 psi.
Directionally drilled 9-7/8" hole. Dynadril stuck at 3749', unable to work free. Backed
off at 1987'. Washed over and recovered fish to 3177'.
MAR ! 5 1974
sz~mm TZT~ ~no_r'a T.i cm~q Fnoi rlo_~r
, , ~ · _
Ill II Il I I 1! ,m .11 1. .1 ! 111 Ill i,i i ii i.
NoTE --Report off this form is recluired for '-eaCh calendar month~ regardless of the status of operation~; a~d m~st i>o filed in dupli~te with the
oil and got coneervatlon committee bythe ISth of the suoceediflg month, mlle~ otherwise directed.
December 21, 1973
Re = M I dd le Ground Shoat A-24-1
She l I Ol I Company, Operator
Permit No. 73-38
Mr. M. G. Mci(la
She I I OII Company
Shel I Bu] Idlng
P. O. Box 3397
Los Angel es, Ca I I fornl a 90051
Dear Slr:
Encl. osed Is the approved application for pere!t te drill ~ abeve referer~ed
well In December 1973 from ~ Middle Ground Shoal "A" Platform.
~ell saaples, core chips end a cud log are no~ requlred. A dlre~at survey
Is required.
Pot lu*lon of any waters of the State ts prohlbl~ by AS 46, ~p?er 03, Article
7 and the regulations proautgatefl ttmreunde~ (Title t8, Alaska Ada~lnlstratlve
Code, Chapter 70) and by the Federal 1dater laollu~i~ Ceatrol Act, as aaended.
Prior to ceaaenclng operations ~fou =ay be ~tac1~ by a ~attve of the
In the event of suspension ~r abaadoa~ent pta.se give this office adequate
advance notification so that ~ cay t"mve a wl~ma$$. presamt.
Very truly yours,
Thoaas R. Marsha I I, J r.
Executl ye Secretary
Alaska 011 and Gas Conservation
Enc I osure
cc: Departeent of Fish and gaee, Habltat Sectloa w/o eric!.
Department of Envl ronmenta I Co~s~rvatlor~ ~to eec:t.
Porto I0'-- 401 ,
I~'V. I-l--71
SUBMIT IN TRIP
(Other lnstr~etton~/
reverse side)
STATE O,F ALASKA
OIL AND GAS CONSERVA,TIO'N ,C.OMMITTEE
PERMIT TO DRILL OR DEEPEN
DRILL I~l DEEPEN J--J
APl #50-133-20258
$.
6.LF_~SE DI/~IGNATION AND S~RIAL NO.
ADL 18754
IF lIN'DIAN, AI~O~ OR TRIBE NA1VLE
2. NAME OF OPeRaTOR
Shell 0il Company
3. ADDRF. SS O~ OPEI%ATOR
1008 West Sixth Street, Los Ange,les~ California ,
4. LOCATION OF WELL At surface
See below*
At proposed prod. zone
See below**
13. DISTANCE IN MILES AND DIRECTION F~OM NEAREST TOWN OR POST OFFICE*
17 miles NW of Kenai~ Alaska
14, BOND INFO~MA~IQN:
Sta,~ew~ae 0il
TYPE and Gas Suretyand/orNo. TIC 136503
15. DISTANCE FHOM PROPOSED*
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also tO nearest drig, unit, ifany) - u 280
_
18. DISTANCE PROM PROPOSED LOCATION'
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT.
1050+'
21~ ELEVATIONS {Show whether DP, RT, CR, ete.~
16. NO. OF ACRES IN LEASE
3746
Ii~. PROPOSm DEP~
10~700'
11}' D.F. ,,,
23, PROPOSED CASING AND CEMENTING PROGRAM
None
8. UNIT, FARM OR LEASE NACRE
Middle Ground Shoal
~, WELL NO,
A-24-1
I0. FIELD AND POOL. OR WILDCAT
Middle Ground Shoal
Il. SEC. T.. R.. i~T.. (BOTTOM
HOLE OBJECTIVE)
12.
1, T.8N., R.13W.
,.~o--, $100,000
17. NO, ACRES ASSIGNED
TO THiS WELL
40
20. ROTARY OR CABLE TOOLS
Re t ary
22. APPROX. DATE WORK WILL START*
December 15 ~ 1973
, ,
SIZE OF HOLE SIZE OF CASING:, WEIGHT PER FOOT l GRADrE SETTING DEPTH quantify of cement
17-1/2" 13-3/8" 61# J-55 2,500+' _ 2.,550 cu.ft.
8-3/4" 7" 29# N-80 10,700+' 1,200 cu. ft.
*Surface: Conductor 28, Leg 4 at 63.45' S and 56.79' E from center Leg 1 at 1627' N
and .435' W from SE corner Section 11, T.8N., R.13W., S.M.
**Top of Production Zone: 2000+' East from SW corner, Section 1, T8N., R.13W., S.M.
(est. 4393' N 33° 45' E from surface.)
gOT 7; 973
~ ABOVE SPACE D~SCI~IBE I~ROI~OSED P~R~: Ii ~1 Is to dee~n 'give ~ on present p~u~lve zone ~d pro~
~w preclusive ~ne. ~.~l ls ~ arlll 0r a~n d~ec%to~lty, give Pe~ent. ~' on s~bsu~a~ ~t~ ~d me d.' ~.' ~
ye.ica, dept, Give bio. ut '~e(e~ter-.~,~am. ~¥~1~. ~ ~t t~.~
24, I hereby certify that the Foregoing Is ~e ~, Corre~ D~~t{~,
STGN~~~//~.._ . DA= -/~ ~. _? ~= ~erat_ ions Engineer
(This space /or State office use)
CONDITIONS OF APPROVAL, IF ANY:
J MU,D LO'C; OTHER HEQU~S:
[] YES ~[[ NO
A.P.I. 1N'IIMER,IC~ COD~
~EE TRANSMITTAL LETTER
SAMPLES AND CORE CHIPS R.F_,~IJ'I.JJ,JIO
DII~EC~IONA3~ SURVEY RE~
~ YES ~ NO
P~[RM~'F NO AJ~PP~:)VAL DA~'~J December 21, ! 97 3
.P~o~]~~ ~ ~~ ~A ~. Executive Secre~ar_y~.~ December 21,
In--ohs ~ Revere Side
--I
1973
SHELL OIL COMPANY
SHELL BUILDING
1008 WEST SIXTH STREET
LOS ANGELES, CALIFORNIA 90017
October 26, 1973
TELEPHONE: 482-3131
State of Alaska
Division'of Oil.and'Gas ·
.3001. Porcupine'Drive
Anchorage,'Alaska 99501
.Attention: 'Mr. Homer :L. :Burrell
Gentlemen:
.October"26, ;I973:
c. GEOL
C. ENG
--- 1 ENG
2 ENG J
3 ENG
4 ENG
1 G'EOL
2 GEOL
3 GEOL
~
__
DRAFT
s~c
CONFER:
FILE:
. Attached. is · the. reqUest,' in' triplicate' to · drill
Middle 'Ground. Shoal A-24'1. well. ' . InclUded" are the. following:
1..'Proposed Work Sheet''
2.. Target'Map
3 Location Plat
4. $100 Filing.Fee.CheCk.
.yours..verY'truly,
, N. 'G: 'McKim
Division Operations . Engineer
.West Coast Division
JDM:md
AttaChments
cc: w/attachments
.Atlantic Richfield.Company
.Standard Oil Company.of-California
'Amoco'Production Company
U,S,G.S.
OCT 9 1973
ORIGINAL
DRILLING WORK SHEET
SAS-MGS A- 24-1
MIDDLE GROUND SHOAL FIELD: ALASKA
Surface Location: Conductor 28, Leg 4, Platform A. Conductor 28 at 63.45' S
and 56.79' E from center Leg 1 at 1627' N and 435' W from
SE corner Section 11, T.8N., R.13W., S.M.
Targets: (1) 200' dim.. 4393', N 33° 45' E from surface at 8545' V.D.
(2) 200' dia 4900' N 33° 45' E from surface at 9245' V.D
Elevatiom: D.F. 116' (above MLLW)
Well Depth: 10,700'+ M.D.; 9418'+ T.V.D.
Casing Program: 2500+' 13-3/8'' 10,700+' 7"
P. rpKram:
1. Move rig over 24" Conductor 28, Leg 4. Flange up 24" riser with pitcher
nipple. Hook up flow and fill lines.
2. Run in with 17-1/2" bit and clean out to just below shoe at 317'. Run
17-1/2" bit on dyna-drill and kick out from leg to clear platform and
surrounding wells.
3. After clearing all wells drill in direction as indicated on Target Map.
Build angle at 3°/100' to 30°. Use 18' monel and 25' monel in tandem
for proper survey response. Drill 17-1/2" hole to 2500+'.
.
4. Run 2500'+ of 13-3/8", 61#, J-55 Buttress thread casing equipped with
plain cement guide shoe on bottom and flexiflow fill-up collar one
joint above shoe. Pipelock bottom five joints with Shell Epon Adhesive
VI. Cement with 2350 cuft API Class G cement premixed with
bentonite (96 pcf slurry), followed by 200 cuft API Class q. neat ce-
ment ('118 pcf slurry). Calculated cement volume is 307° over gauge hole.
If cement does not return to surface, run macaroni down annulus and cement
to surface' with API Class G neat cement.
CasinR
De si~n. Fact,o..rs
Size Interval LenRth Wt. Grade Conn. Collapse Tension ~uYst~
_
13-3/8" 0-2500+ ' 2500+' 61# J-55 Buttress 1.39 NA NA
* Burst rating = 3090 psi"
Page 1 of 3
O07 9 i973
,Dr.illi.nK Work Sheet
SAS-MGS A-24-1
Middle Ground Shofll Field~ Alask~
pro_~_r.am (Continued)
Cement
Volume
Fill Cement Type ..~Cu F_t
Excess
Weight Yield
(Psi/ft~ (Ft3/s_x)~
Mix Wa ter
,(Ft3/sx)_
To Sur-' "G" blended w/ 2350 (30%
face 107o bentonite over gauge)
(
Tail In API~."G" 200
.680 1.92
98 pcf
.819 1 18
118 pcf
1.39
0.70
Notes:
a. Casing capacity = 85.4 cuft per 100'. Casing displacement
2.22 bbls per 100'.
b. Mix cement with sea water.
c. Use pressure chart and densometer (if available).
d. Maximum allowable casing pull = 600.000#.
5. Land casing in 24" hub and flange up 12" 3000 psi B.O.P.E. and riser
stack consisting of double Shaffer gate and G. K. Hydril. Test riser,
B.O.P.E., and casing to 1500 psi.
6. Drill 8-3/4" hole to total depth (10,700+') using lignosulfonate mud.
Maintain less than 10cc water loss and 5000 ppm NaC1 below 6000'. Main-
rain directional control as noted on attached Target Map.
7. Run logs:
(1) SP-GR-DIL T.D. to surface casing
(2) SP-BHC Sonic T.D. to 5000-+'.
8. Run 10,700+' of 7", 29~/, N-80, Buttress casing equipped with float shoe
on bottom and flexiflow fill up collar two joints above shoe. Pipelock
bottom ten joints with Shell Epon Adhesive VI. Centralize casing, as
hole conditions permit, based upon log evaluation.
Cas
Size .Int, erva!_ ' 'Len~t.h Wt. Grade . Conn._
De.s ig~n Fajctors
hollap, se* Tension .B..Ur, S_t
7" 0-10,700+' 10,700+' 29~/ N-80 Buttress 1.43 2.18 1 56
* Based upon 0.48 psi/ft formation gradient with casing evacuated.
Page 2 of 3
ORIGINAL
Drillin~ Work Sheet
SAS-MGS A-24-1
Middle Ground Shoal Field~ Alaska
ProKram (Continued)
9. Cement casing with an estimated 1200 cuft API Class "G" cement premixed
with 1% Halad-9 and one lb per sack CFR-2, mixed with fresh water. Pre-
flush with a minimum of 50 cuft fresh water.
Cement
Note: Actual cement volume to be 100% in excess over amount determined
from caliper log to cement from T.D. to 6200±'.
Volume Weight Yield Mix Water
Fill Cement Type (Cu Ft). Excess (Psi/ft~ (Ft3/sx) (Ft3/sx)
T.D. to "G" blended w/ Est. 1200 100% .819
6200+' 1% Halad-9 + (100% over (118 pcf)
l#/sx CFR-2 gauge)
1.18 0.70
10. Run 6" bit, clean out to fill up collar.
11. Run Schlumberger Gamma Ray - Cement Bond - Collar Log, T.Do to 500±'
above top of cement.
12. A completion work sheet will be issued based upon evaluation of logs.
Los Angeles, California
Page 3 of 3
APPROVED:
DATE:
RECOMMENDED:
i973
BY .................................. DATE: .....................SUBJ£CT..~....~ .............................................. ~. .............. : ........... SHEET NO .................. OF ................
CHKD. BY .................. DATE ........: .......... ~.,~.. ~ ~ ~ ~ ~ ~~
. ,,, .~;~., ~, .... .~.~ ........................ :..~ ..... ~....~ ....... ~o,,o ......................................... .
....................................................... ,. ............................................................ ,..~,. ......... ~ ........... ~ ........ Z ..... "
· ~//~ ~ . ..
~/ &-_.-..,.. ...: ........ -~ ,, .;,, ...... . _.....:.:
~ i/ ........ ~, ~,o. ~ ?'~o~...,~ ..................... ,: ..... ~ ....... ~: ........
IO,qo0
ND'
11
A-32-11
e
A-42-11
12
A-11-12
T. 8 N., R.13 W,, S.M.
· A-13-1
J · A-33-1
A-43-11 2'//
Leg
/ 4
LOC~TTION OF COflDUCTOR 32, LEG # 4
A-14-1
2000'
A- 25-1
-j' 'A- 24- I
· A-23-12
ADL 18754
LOCATiOH..OF .PRJ)DUCJFIG - ZOflE WELL' A'24-1
PUBLIC LAND DESCRIPTION
CONDUCTOR 32 LEG No 4 LOCATED 58.37'S
AND 46.85'E FROM CENTER OF LEG No.l 2000'E FROM "THE SV~ COR.
CENTER LEG No I LOCATED 1627' N AND OF SEC. 1 , T8N; RI3W, S.M.
435'W FROM THE SE COR. OF SEC. 11
TSN, R13W, S.M.
IDRAWN I~Y: SCA~E: 1" 1 1
SHELL O L. COh" PANY:·Z21-6;7523 '
DATE:OCTOBER :24,1973
SHELL-ATLANTIC-STANDt~RD WELL 'A-24-1 IN SE~. 1t' -
.15W., S.M. -. COOK. INLET - STATE OF ALAS[~A .... .
company ,, . ~// ~;/~ .... --- _
Lease & Well No._ /~/~,s- ~,.-~:z'
CHECK LIST FOR NEW WELL PERMITS
Yes No Remarks
, ,,
Is well to be located in a defined pool ................. .//~ ~ __ _ ....................
Do statewide rules apply ~
· · · m · · m · · · · · · · · · · · · · · · · ·
Is a registered survey plat attached .................. ~ ~
Is well located proper distance from property line ...........
I~_)well located proper distance from other wells ............
Is sufficien~,undedi'Eated acreage available in this pool ........ . _ ~,
Is well to be deviated
,,~
Is operator the only affected party ................... ~}t~-
Can pem~it be approved before ten-day wait ...... ; ........ ~4~g~ ~
· Does operator have a bond i~n force ................... //~,~_
· Is 'conductor string provided ......................
· Is enougi~ cemeHt used to circulate on conductor and surface ...... --
Does BOPE have sufficien: pressure rating ...... ..
dditional Requirements:
· Will cement tie in surface and intermediate or production strings
· W~ cement cover a.ll possible productive horizons ..........
. Will surface casing cover all fresh water'zones ...........
, W~11 surface csg. ~nCern~l burs¢ equ~l .5 ps~/f¢. ¢o nex~ s~r~ng
. .W~11 all casing give ad. equaCe safe~ Jn collapse and tension , ,