Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout176-077 f STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Repair well: Plugging: Time extension: Stimulate: Change approved program: Pull tubing: Variance: X Perforate: Other: 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) UNION OIL COMPANY OF CALIFORNIA (UNOCAL) Development: 105' KB MSL feet "3. Address Exploratory: 7. Unit or Property name Stratigraphic: Granite Point 18742 P.O. BOX196247 ANCHORAG)E, AK,,,. 995,,1.9 Service: X 4. Location of well at surface .../~//' J 8. Well number 771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM 26 / At top of productive interval 9. Permit numberN. / 595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M. 76-0077-0 At effective depth 10,310' 10. APl number 963' FSL, 2898' FEL, Sec. 1, T10N, R12W, S.M. 50- 733-20297-00 At total depth 11. Field/Pool 1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M. Middle Kenai "C" Sands 12. Present well condition summary Total depth: measured 10860' feet" ' true vertical 10377' feet ''/ Plugs(measured) Effective depth: measured 10310' feet Junk (measured) true vertical 9831' feet Casing Length Size Cemented Measured depth True vertical depth Structural 622' 20" 1285 sx 622' 622' Conductor 2022' 13-3/8" 1600 sx 2022' 1990' Surface 8004' 9-5/8" 700 sx 8004' 7600' Intermediate Production Liner 2608' 7" 500 sx 10336' 9857' Perforation depth: measured See Attachment true vertical See Attachment Tubing (size, grade, and measured depth) Short 3-1/2", N-80 @ 7632' Long 3-1/2" N-80 @ 7761' 2" HS-80 Coiled Tubing @ 7541' Packers and SSSV (type and measured depth) Baker "FA-I" PKR @ 7541' 13. Attachements Description summary of proposal: Detailed operations program: BOP sketch: Temperature Survey, Step Rate Test, Wellbore Schematic, and Perforation Detail Sheet. 14. Estimated date for commencing operation 15. Status of well classification as: N/A 16. If proposal well verbally approved: Oil: Gas: Suspended: Name of approver Date approved Service: X '17. I hereby certify that th,.gJem~oing is true and correct to the best of my knowledge. Jeffery J. Dd~n / .// if~ ."~ Signed: ~~/"/' \,/¢ ~ Title: Waterflood Technician Date: 8/22/2002 // Y ./ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness IA,.p,.proval No. Plug integrity BOP Test Location clearance ('~ ~i""'~ ~'"" ,~i ...... ?" ~,i '~ ~ ~- Mechanical Int-~gr~ Test ~ ---~--~sequent form required 10- e"C~'-~rN,,~-,.c,~ ~~~' ...::..i,,,it,2', .~:....~.. ~. ...... ,, ..... Approved by order of the Commissioner Commissioner Date Form 10-403 Rev 06/15/88 BFL ORIGINAL APR 1 003 ! SUBMIT IN TRIPLICATE NOTE TO FILE Granite Point Anna 26-42 PTD 176-077 302-271 Unocal has submitted a temperature survey to demonstrate mechanical integrity for this injection well. Anna 26 is one of several production wells without packers that were approved for conversion to injection service in early 2000. This note evaluates Unocal's submitted information and recommends acceptance of it. In late 2000, Unocal proposed to convert several production wells to injection service. This request for GP Anna Platform was similar to the request of MGS Baker platform a year earlier. What is notable on these conversions is that none of the wells was completed with a packer. All the wells had been equipped with dual tubing strings and were hydraulically pumped. A procedure was developed that involved reviewing the well history and determining that the casing had been tested, evaluating the cement bond logs and running sequential temperature surveys to demonstrate that the injection water was being confined to the intended intervals. In addition, Unocal placed the wells on the monthly monitoring list and has been providing daily rates and pressures in digital form. I made an assessment of the well's construction in early October 2000 and acceptable mechanical integrity was determined. Although approval was given to convert the well in late 2000, water was not injected until May 2002. 2 temperature plots are presented on the graph. The baseline survey was obtained in 11/25/01. After 90 days injection, a follow up survey was obtained 7/31/02 and shows the expected cool down due to injecting relatively cold filtered inlet water, especially in the perforated intervals. The well has performed satisfactorily since conversion. Since placing the well in service, Unocal has been providing the necessary monitoring information. Examination of the information indicates that the tubing and casing pressures have been tracking as expected with the pressures responding to rate changes. No high rate change is evident which would indicate a leak developing. The most recent information indicates that the well has been shut in since mid January. Area Injection Order 6 allows injection into the Northern Portion of Granite Point Field, developed by the Anna and Bruce Platforms. The BHL of well An-26 is located in the covered area. The portion of aquifers beneath Cook Inlet described by a 1/4 mile area beyond and lying directly below the Middle Ground Shoal Field are exempted for Class II injection activities by 40 CFR 147.102(b)(2)(i) and 20 AAC 25.440(c). Granting Unocal's request will not endanger any fresh water. I recommend acceptance of the submitted temperature information. A follow up survey should be required in 2 years and the monthly pressure and rate information should continue to be submitted. Tom Maunder, PE Sr. Petroleum Engineer April 11, 2003 M:\UIC File Reviews\030411-GP 26-42.doc -- Summary by Month: Individual Well Injection / Disposal Well Name: Field/Pool: 2002 GRANITE PT ST 18742 26 GRANITE PT, MIDDLE KENAI APl: 50-733-20297-00-00 Sales Cd: 30 Jan Feb Mar Apr May Permit to Drill: 1760770 Operator: UNION OIL CO OF CALIFORNIA Acct Grp: 2 Final Status: 1-OIL Current Status: 1WINJ Jun Jul Aug Sep Oct Nov Dec Meth Days Wtr Gas 2002 2003 Totals: Water 71,483 Gas wtr tnj 3O 8,795 0 0 Jan Feb Mar Apr May Wp I~ Wp Inj W~ I~ Wp I~ Wp IN Wp IN 30 31 29 19 31 30 5,651 10,166 5 8,831 13,383 11,343 0 0 0 0 0 0 Cum Wtr 71,483 Cum Gas 0 W~ IN 31 13,309 0 Jun Jul Aug Sep Oct Nov Dec Meth Wtr Inj Shut-In Days 13 0 Wtr 9,359 0 Gas 0 0 2003 Totals: Water 9,359 Gas Cum Wtr 80,842 Cum Gas 0 Friday, April 11,2003 Page 1 Anna 26 3000 2500 2000 1500 IOO0 5OO 0 JAN. 1.2003 7:31AM NO. 073 P.5/8 . e 17fç;-D7í Month Dee API No Platform Dahl created &0733202970D ANNA PLATFORM 1/1/2003 Date Hrw On VolumelnJlcted TØG Press 9.625 CSG Press 13.375 CSDpress Comments 12/1/20112 24 1495 2067 2067 241 1212/2002 24 1504 2100 2100 241 12/3/2002 24 1506 2119 2100 239 1214./2002 24 1509 21:ro 2130 241 12/512002 24 1511 2148 2148 242 12/6/2002 24 1511 3375 3375 223 12n12002 24 1512 2169 2169 238 12/8/2002 24 1510 2177 2250 233 121912002 24 1511 2181 2181 2ag 12/10/2002 24 1510 2188 2188 238 12/11/2002 24 1507 2191 2191 236 12/1212002 24 1507 2194 2194 233 12/13/2002 24 1503 2200 2200 233 12/14/2002 24, 1496 2133 2250 231 12115/2002 24- 660 1064- 10B4 203 12/1612002 24 54,4 1772 1772 231 12/1712002 2<4, 1244 1656 1608 222 12/1 812002 20 993 1864 1864 230 12/1 9/2002 24- 1643 2320 2250 233 , 2120/2002 24 174ð 2372 2350 230 12/2112002 24 1737 2394 2394 230 '2/2212002 24 1732 2413 2400 228 12/2312002 24 1733 2425 2400 228 12124/2002 24 1732 2438 2425 310 1212512002 24 1730 2445 2445 223 12/2612002 24 1726 2455 2450 222 12/2712002 24 1724 3342 2450 222 1212812002 24 1722 2463 2450 225 12/29/2002 24 1718 2467 2450 225 12/3012002 24 1718 2475 2475 225 12/3112002 24 1318 2313' 2313 222 ...:~~.~....,.... (-,""'!,\r:J¡¡".¡,cr· ."t-.i"\lp T. r., ¡c:,¡, . C l"" ()f\ n~ " ~) LUUJ SEP. 1.2002 6:43AM NO.431 P.4/9 - e Iltp-071 Year 2002 API No Plalfonn 5.07332E+11 ANNA ÞLATFO Date Created 911/02 Volume TBG 9.625 CSG Date Hra On lniectéd Press Press 13.375 Ceo Press Comments 8/1/2002 24 0 0 0 275 8/212002 24 0 0 0 280 81312002 24 0 0 0 280 8/4/2002 24 0 0 0 280 8/5/2002 24 5 0 0 285 BI6/2002 24 0 0 0 285 817/2002 24 0 0 0 283 61812002 24 0 0 0 291 8/9/2002 24 0 0 0 281 8/1012002 24 0 0 0 ~94 8/11/2002 24 0 0 0 294 8/1212002 24 0 0 0 281 8/13/2002 24 0 0 0 295 8/14/2002 24 0 0 0 302 6/15/2002 24 0 0 0 300 8/1612002 24 0 Q 0 295 8/1712002 24 0 0 0 295 8/1612002 24 0 0 0 294 B/1912002 24 0 0 0 295 8120/2002 24 0 0 0 302 8/21/2002 0 0 0 0 297 6/22/2002 18 0 0 0 300 B/2:3/2002 6 0 0 0 300 8/2412Q02 24 0 0 0 303 8/2512002 0 0 0 0 303 8/26/2002 24 0 0 0 300 8/2712002 24 0 0 0 305 8/2812002 24 0 0 0 0 8/2912002 24 0 0 0 300 6/30/2002 24 0 0 0 305 6/31/2002 24 5 0 0 295 lõntl Of bport .... -,~.,.,..,-._~. -........-~~_. p t~ d \' \' () Report Name \ IMontldv Infector Varianc ~I (\ IS) IS) (\ M t!) :::J a: E a: U) (Y) U) aJ "" (\ o z: - e Volume TBG 9.625 CSG Date HIS On Iniected Press Press 13.376 Csg Press Comments 7/1/2002 24 314 275 375 285 71212002 24 422 500 600 275 71312002 24 480 530 650 275 71412002 24 477 540 650 280 71512002 24 1250 2575 2300 340 71612002 24 2329 2600 2500 320 71712002 24 179'1 2555 2500 325 7J8I2002 24 2117 2606 2606 319 7/912Q02 24 2092 2623 2623 317 7/1012002 24 1291 1570 1570 289 7I1112Q02 2.4- 1305 1830 1830 302 7/1212002 24 1480 1863 1863 308 7/13/2002 24 1472 1877 1877 305 7/14/2002 24 146B 1889 1889 311 7£15/2002 24 1170 1420 1600 285 7/16/2002 24 1058 1365 1500 295 7/17/2002 24 108a 1350 1500 290 7/1812002 24 1053 1335 1500 280 7/19/2002 24 1048 1325 1500 285 7/2012002 24 1040 1315 1500 285 7/2112002 24 1037 1310 1500 285 7/22J2002 2.4 1026 1306 1450 283 7/2312002 24 1021 1309 1450 283 7/2412002 23.6 997 1281 1450 277 7/2512002 2.4 1011 1294 1450 281 712812002 24 1005 1294 1450 280 7127/2002 24 1003 1295 1450 280 712812002 24 1002 1292 1450 281 7/29/2002 24 361 1290 1450 280 7/3012002 24 0 16 0 264 7/31/2002 24 0 0 0 270 t ¡, t: 1, f I '\~'t!raø~' (J) "- If) !L Tbg Strio AN26~2 Month Ju] Year 2002 APi No 5.07332E+11 Platfonn ANNA PLATFO Date Created 8/1/02 [Fwd: Anna 26 (176-077) MIT failure] Subject: [Fwd: Anna 26 (176-077) MIT failure] Date: Tue, 14 Jan 2003 07:26:08 -0900 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: Bob Fleckenstein <bob_fleckenstein@admin.state.ak.us>, Jim Regg <jim_regg@admin.state.ak.us> Bob, Would you please make an entry in the database regarding this MIT failure. I think you can put the information in the comment column. Jim, This well is an injector without a packer, I have enclosed the document I prepared in October 2000. Thanks, Tom Subject: Re: Anna 26 (176-077) MIT failure Date: Tue, 14 Jan 2003 07:22:29 -0900 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: "Dolan, Jeff J" <dolanjj@unocal.com> Jeff, Thanks for the notice. As you and the platform sort things out, keep us informed regarding the determination. Tom Maunder, PE AOGCC "Dolan, Jeff J" wrote: Tom, At 15:53 today the tubing, 9 5/8" and 13 3/8" casing equalized pressure on Anna 26 water injector. The platform crevimmediately shut in the well and began bleeding down the casings. Regards; Jeff Dolan Water Flood Technician Oil Asset Group Alaska Business Unit Unocal 76 Voice 907.263.7807 Fax 907.263.7884 Email dolanjj@unocal.com 1 of 2 1/18/2003 4:14 PM Unocal 1 Anna 26-42 temperature and step rate data sets. • Maunder, Thomas E (DOA) From: Dolan, Jeff J [dolanjj@unocal.com] Sent: Monday, September 09, 2002 2:09 PM To: tom_maunder@admin.state.ak.us Cc: Martin, J. Hal Subject: Unocal /Anna 26-42 temperature and step rate data sets. Attachments: Anna 26 20020821.zip Tom, - ~~~ Here are the temperature survey data and step rate data for Anna 26-42 (Permit # 1760770 API# 50-733- 20297-00). I mailed the request for variance letter and 10-403 before going on vacation (August 22) but I don't believe I got the data emailed to you. «Anna 26 20020$21.zip» Regards; Jeff Dolan Water Flood Technician Oil Asset Group Alaska Business Unit Unocal 76 Voice 907.263.7807 Fax 907.263.7884 Email dolanjj@unocal.com ~~~ APR ~ ~ 2005 • Page 1 of 1 4/8/2008 ANNA-26 Step Rate Test July 2, 2002 Frac Pressure and Infectivity Analysis 4000 3500 3000 2500 rn h a m 2000 L a rn c H 1500 1000 500 0 • ~ • • N • • Historical Data ® SRT Linear (SRT) 0 500 1000 1500 2900 Rate bwipd) • • 2500 3000 3500 4000 4/8/2008 8:49 AM Jeff Dolan AN 26 Step Rate Test.xls SRT Press vs Rate Step rate data recording sheet Well : An-26 Date /Time Rate BPD Tubin pressure casin pressure Choke Comments Start of Test Manifold pressure 7/2/02 14:00 492 470 277 8/64tn 3500 psi Reduce to 500 bwpd Wait 72 hours Step 1 1000 BWPD 7/5/02 15:00 1030 981 2g5 m 12/64 Manifold pressure 3490 psi Step 2 1500 BWPD 7/6/02 16:00 1490 1413 314 m 13/64 Manifold pressure 3580 psi Step 3 2000 BWPD m Manifold pressure 7/7/02 17:00 2006 1972 334 14/64 3502 psi Step 4 2500 BWPD :n Manifold pressure 7/8/02 18:00 2550 2541 350 20/64 3544 psi Step 5 3000 BWPD Manifold pressure 7/9/02 19:00 2835 2830 353 Full 3437 psi Step 6 3500 BWPD End of test Step 7 4000 BWPD Step 8 5000 BWPD Step 9 5500 BWPD Step 10 6000 BWPD • Note :record data at end of each period just before increasing rate to allow 1 hour for pressures to stabilize • • AN-26 Temperature Surveys 0 . 500 i 1000 1500 i 2000 2500 3000 i 3500 I m Y t 4000 .. a i 4500 j i i I 5000 5500 6000 6500 i i 7000 i 7500 i 8000 ~- 0 20" Csq (® 622' MD POOH 11 25 2001 Baseline RIH 07 31 2002 POOH 07 31 2002 POOH 07 31 2002 corrected 73-3/8" Csg ~ 2022' MD ~ - --- - - Applied constants to depth and temperature to remove _- - -- - - recording di erences _ ~ ~ - - - ~ -- - i _ -Coil Tbg Cavity ~ 7541' MD I ~ i i i 20 40 60 80 100 120 140 160 180 Tem p Unocal Corporation P.O. Box 196247 Anchorage, AK 99501 Telephone (907) 263-7805 UNOCAL ) August 22, 2002 State of Alaska Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 Attn: Tom Maunder Re: Anna 26-42 injection variance Dear Mr. Maunder: The follow-up temperature survey for Anna 26-42 (Permit # 1760770 API# 50-733-20297-00) water injector was completed July 31, 2002. The well was on injection at low rates for 90 days during which time approximately 68,000 bah'els of cool filtered seawater was injected. We feel this is sufficient volume to reveal any temperature anomalies resulting from flow into undesired intervals. None are observed on the attached temperature survey plot. The step rate test (SRT), conducted on July 2, 2002, was performed up to the maximum available pump pressure of 2,830 psi and as expected, showed no indication of exceeding the formation fracture pressure. Ongoing facilities maintenance issues on the Anna delayed the completion of this project. I have transmitted the basic data files for the SRT and Temperature surveys to you by email. I am requesting your approval for a variance to continue injection into Anna 26-42 under the procedures set forth in the document "Procedures to Obtain Variances on Packerless Wells (version 4) February 9, 2000". I have enclosed a 10-403 for your signature along with plots of the temperature survey and step rate test. If you have any questions regarding this, please contact myself at 263-7807 or Hal Martin at 263-7675. Enclosures Sincerely, jeff~~~l~ Water flood Technician Cook Inlet Water flood Management Aogcc An 26 Application tbr variance.doc Comparison after 90 days injection POOH 11 25 2001 Baseline RIH 07 31 2002 Follow up ICoil Tbg Cavity @ 7541' MD 0 2O 8/22/2002 7:32 AM 40 60 80 100 120 140 160 180 Temp Anna 26 Temp Survey composite 20020821.xls Chart 4000 ANNA-26 Step Rate Test Frac Pressure and Injectivity Analysis July 2, 2002 35OO 3OOO 25OO 2000 1500 IOO0 5OO 0 8121102 4:57 PM 500 1000 1500 2000 2500 3000 3500 4000 Rate(bwipd) Jeff Dolan AN 26 Step Rate Test. xls SRT Press vs Rate Plot Rate vs Time - We~l AN 26-42 Data Interval Rate vs Time Tbg P vs Time Csg P vs Time Time %~*J'~* Well No. 26 Actual ,/et Pump Comptedon as of 1/23/99 RKB to TBG Head = 33' , E Tubing 7561'-7566' 7,25,'98 Anna 26 1-23-99 final dwg.doc CASING .AND TUBING DETAIL 20" 74 J-55 SurDce 622' 1%3/8" 545 J-55 12615 SurPace 2,022' %5/8" 40 & 435 N-g0 & S-95 BT£ 8755 Surfi~ce 8,004' 7" 26 N-80 BTC 6276 7728' 10,336' Tiibing: LS 3-b2" 92 1-80 BTC SC' 2992 34' 7,761' SS 3-1/2"92 [.-80 B'I( SC 2992 34' 7.632' 2" 156" ~allHS-80 Coll Ib~ 1688 32' 754 !' JEWELRY DETAIL NO~ De~ ID OD lten~ 50 3' 2 7,642' 300 3865 3 7.64¥ 2~697 650 4 7,665' 300 4.50 5 7,666' 2992 35 6 7,761' 300 425 Cameron, DCB, Fubing tlangeh 3-1/2' x i I", 5M. 3-1/2" EUE Lif~ l'lnead × Butt Suspension [bread, BPVP Crossover, 3-l/2" Buttless Box x 3-1/2" iii 8rd Pin Kobe Cavity, 3", Fype :B', ParalId Db} SN: 231-1-I0-97 Crossover, 3-I/2" [[ I' 8rd Box x 3-I/2" Buttress pm 3 i~s, 3 [/2". 92~, L-gO. Buttress Tubing Wireline Entry Guide, 3- I/2" Buttress Box D 7526' 1.625" 2.270" Trico jet pump cavity 7540' 1.300" 2.750" Baker Seal Assy and seal bore extension 754U 1.440" 2.200" Baker K-22 Anchor Seal Assy E 7541' 1.375" 2.765" Baker "FA-I" packer ELM Short Strin&[ A 7,632' 200 3865 Crossover, 3-1/2" Bum'ess Box x 2-3/8" EUE 8rd }>in B 7,633' 200 2375 Pup Joint, 2-3/8" IrE 8rd C 7595' 1.688 6' Tbg perf gun stuck in short string. 21.5' hmg total WLM fish PERFORATION HISTORY -- ln!~rval , Accum. , Date Zone Top Btm Amt _spf Comments 1/9/77_ C-3 8,2~' . 8,266'. 50' . 4 S~ueezed 7-3%86 1/9/77, C-3. 8 270'. 8~296'· 26' , 4 Squeezed 7~3%86 1/9/77, C~4, 8 307'. 8 340'. 33' , 4 Squeezed 7-31-86 11/22/98 C-5 8 467'. 8 589'. 122' 8 ~Reperf. 2-1/8" E J, 0 deg. 11/22/98 _ C-5. 8,635'~ 8,660' 25' . 8 LReperf. 2-1/8" E J, 0deg. 11/22/98 C-5 8,678'. 8 744', 66' , 8 ;Reperf 2~1/8" E J, 0 de~. 17~2/97 . C-6· 8,973'. 9,000' 27' , 8 Reperf, 2-1/8" E J,0 deo 11/22/97 . C-7. 9 485', 9 530'. 45' 8 Reperf. 2-1/8" E J, 11/22/97 . C-7 9,540'. 9,795' 255'. 8 Rep~d~ 2~1/8" E J, 0 de~ 11/22/98 ~ C-7_ 9 880'~ 9 955', 75' , 4/8/12Reperf, 2-1/8" E J, 0 de9. C-7. 9 956', ~10 045' . 89' . 4/8 Reperf 3/3!/85. PBTD = 10,310' TD = 10,860' MAX HOLE ANGLE = 25° @ 6,200' DRAWN BY: TAB 08/22:02 Zone C-3 C-3 Anna 26 Perforations MD TVD Subsea Top Btm Top Btm Top Btm 8,216' 8,266' 7,793' 7,839' -7,688' -7,734' 8,270' 8,296' 7,849' 7,867' -7,744' -7,762' C-4 8,307' 8,340' 7,877' 7,914' -7,772' -7,809' C-5 8,467' 8,589' 8,027' 8,139' -7,922' -8,034' C-5 8,635' 8,660' 8,187' 8,215' -8,082' -8,110' C-5 8,678' 8,744' 8,224' 8,291' -8,119' -8,186' C-6 8,973' 9,000' 8,513' 8,542' -8,408' -8,437' C-7 9,485' 9,530' 9,011' 9,060' -8,906' -8,955' C-7 9,540' 9,795' 9,070' 9,317' -8,965' -9,212' C-7 9,880' 9,955' 9,405' 9,475' -9,300' -9,370' C-7 9,956' 10,045' 9,475' 9,564' -9,370' -9,459' Amt Comments 50' Cmt Sqz'd 7/31/86 26' Cmt Sqz'd 7/31/86 33' Cmt Sqz'd 7/31/86 122' 25' 66' 27' 45' 255' 75' 89' 8/22/2002 8:45 AM An-26 403 request for variance 20020822.xls Attachment JUM. ~.~00~ 6:19AM >Historical Data >Wefts )Stattls (da~ly info) >WMerffood Iit]ectors Select Tbg lAN26~:2 --:T.~) Select Time ILast M~nth' String: ."~J Period: Report Name Tbg String Time Period Waterflood Injector Well Status AN 26.42 Last Month Length Volume l'bg Press Csg Press Date (hours) (blxl) (psi) (psi) 6/:I./DZ 2,~ ~6 390 5131/02 2~ ~72 45S 5130102 24 473 4~S ~/29/02 24 4?2 ~ ~6 5/28/02 24 ~72 428 428 5/27102 2~ 283 375 5126/02 2'~ ~ 456 $$0 5/25/02 24 24~ 223 650 512%/02 24 524 562 650 5/23/02 24 503 520 650 5122/02 24 505 523 ;/21/02 24 495 s.~G 5120/02 24 ,H7 $].7 50O 5/18102 2[ 736 768 9;0 St[7102 22 10].8 ].35! 1500 5115102 24 1095 1472 1650 5114102 2'~ 1092 1477 1650 5/I3/02 24 lOl~ 3.470 t650 SI~210Z 24 110t 1700 ~6SO 5111/02 24 1141 1700 1600 $/10/02 2~ [136 17~0 3.650 5f8/02 Z4 109], 1700 517/02 24 1098 2000 5f6/02 24 2ms 1B50 5/5102 21. 976 1BOO 1800 514/02 2~ 972 1950 1950 S15/0~. 18 602 1~50 1450 Date Created 6/2/02 Outer Csg Press (psi) 25O 245 245 250 252 2~ 247 24.7 233 264 266 267 288 2O 2~ 2~ 25 222 225 HO. 935 F'p. 3/801' Comments RECEIVED JUN 0,3 00/_ I~nd of Report http ://]codi ak. each ortown, unocal, com,/da/ts, topi ares/tabu! ar, asp 6/2/2 00:2 Unocal Corporation Alaska Business Unit 909 West 9th Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 263-7807 UNOCALe May 8, 2002 Tom Maunder State of Alaska Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 Re: Completion of Conversion for An-26 Dear Mr. Maunder: The conversion of An-26 to water injection was completed and injection started on May 2, 2002. We plan to conduct a Step Rate Test on or about May 16th and a Temperature Survey on or about June 2nd in accordance with the plan "Procedures to Obtain Variances on Packerless Wells (version 4) February 9, 2000". The well had a baseline temperature survey run on 11/25/98. The new survey data will be compared with that to provide verification of casing integrity. Enclosed is the 10-404 form documenting the conversion. I have attached a well bore schematic, a perforation data sheet and data sheet with the first six days rate and pressure data. Another 10-403 will be submitted with the results of the Step Rate Test and follow- up Temperature Survey to obtain a Variance to inject into this well. Water flood technician Cook Inlet Waterflood Management O:\AOGCC\Correspondences\An-26 10-404 cover letter.doc STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown: Stimulate: Plugging: Perforate: Pull tubing: Alter casing: Repair well: Other: X convert to injection 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Unocal Development: X KB 105' above MSL feet 3. Address Exploratory: 7. Unit or Property name P. O. Box 196247 Stratigraphic: Anchorage, AK 99519-6247 Service: Granite Point 18742 4. Location of well at surface 8. Well number 771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM Anna-26 At top of productive interval 9. Permit number/approval number 595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M. 76-0077-0 At effective depth 10310' 10. APl number 963" FSL, 2898' FEL, Sec. 1, T10NR12W, SM 50-733-20297-00 At total depth 11. Field/Pool 1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, SM Middle Kenai "C" Sands 12. Present well condition summary Total depth: measured 10860 feet Plugs (measured) true vertical 10377 feet Effective depth: measured 10310 feet Junk (measured) true vertical 9831 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 622' 20" 1285 sx 622' 622' Surface 2022' 13-3/8" 1600 sx 2022' 1990' Intermediate 8004' 9-5/8" 700 sx 8004' 7600' Production Liner 2608' 7" 500 sx 7728'-10336' 7343'-9857' Perforation depth: measured see attachment true vertical see attachment Tubing (size, grade, and measured depth) Short 3-1/2", N-80 @ 7638 1.75" 1.91# QT-700 Coiled Tubing @ 7518' ~"'" '~'~ ~"" ~"~" .... '" '?' Long 3-1/2" N-80 @ 10060" Packers and SSSV (type and measured depth) Halliburton TBG PKR @ 7548' .'.~ ....... ~ .... ~ ,~ ~ ~. i "';~ 13. Stimulation or cement squeeze summary ~, ..,"' Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection Data OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 20 150 120 100 Subsequent to operation 0 1014 25 1866 15. Attachments: 16. Status of well classification as: Copies of Logs and Surveys run: Daily Report of Well Operations: Oil: Gas: Suspended: Service: X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge: Signed: ~ ~~.~L~,~ Title: Water flood Technician,., Date:5/8/2002 Form 10-~/04 Rev 05/1,5/88 SUBMIT IN DUPLICATE Page 1 of I >Historical Data >Wells >Status (daily info) >Waterflood Injectors Select Tbg String: iA.N 26T42 .. '-_J Select Time Period: IAII Data. Report Name Tbg String Time Period Date Created Waterflood Injector Well Status AN 26-42 All Data 518/02 Date Length Volume Tbg Press Csg Press Outer Csg Press (hours) (bpd) (psi) (psi) (psi) 5/7/02 24 1098 2000 1900 25 5/6/02 24 1095 1850 1850 25 5/5/02 21 976 1800 1800 222 5/4/02 24 972 1950 1950 225 5/3/02 18 602 1450 1450 228 5/2/02 14 574 1700 1700 233 Comments End of Report http ://kodiak. anchortown.unocal.com/da/templ ates/tabul ar. asp ?report_id=229 5/8/2002 Anna 26 Perforations MD TVD Subsea Zone Top Btm Top Btm Top Btm Amt Comments C-3 8,216' 8,266' 7,793' 7,839' -7,688' -7,734' C-3 8,270' 8,296' 7,849' 7,867' -7,744' -7,762' C-4 8,307' 8,340' 7,877' 7,914' -7,772' -7,809' C-5 8,467' 8,589' 8,027' 8,139' -7,922' -8,034' C-5 8,635' 8,660' 8,187' 8,215' -8,082' -8,110' C-5 8,678' 8,744' 8,224' 8,291' -8,119' -8,186' C-6 8,973' 9,000' 8,513' 8,542' -8,408' -8,437' C-7 9,485' 9,530' 9,011' 9,060' -8,906' -8,955' C-7 9,540' 9,795' 9,070' 9,317' -8,965' -9,212' C-7 9,880' 9,955' 9,405' 9,475' -9,300' -9,370' C-7 9,956' 10,045' 9,475' 9,564' -9,370' -9,459' 50' Cmt Sqz'd 7/31/86 26' Cmt Sqz'd 7/31/86 33' Cmt Sqz'd 7/31/86 122' 25' 66' 27' 45' 255' 75' 89' 5/8/2002 10:32 AM An-26 403 conversion 1-5-00.xls Attachment UNOCAL Anna Well No. 26 Actual Jet Pump Completion as of 1/23/99 RKB to TBG Head = 33' SIZE 20" 13-3/8" 9-5/8" 7" CASING AND TUBING DETAIL WT GRADE CONN ID TOP 74 J-55 54.5 J-55 12.615 40 & 43.5 N-80 & S-95 BTC 8.755 26 N-80 BTC 6.276 Surface Surface Surface 7728' BTM. 622' 2,022' 8,004' 10,336' Tubing: LS 3-1/2" SS 3-1/2" 9.2 L-80 BTC SC 2.992 9.2 L-80 BTC SC 2.992 34' 7,761' 34' 7,632' .156" wall HS-80 Coil Tb~ 1.688 32' 7541' Tubing 7561 '-7566' Cavity leak identified 7/25/98 Fill tagged @ 9,962' 7/23/98 2.25 GR .C = Fish Tubing Holes 7585'-759' NO. Depth JEWELRY DETAIL ID OD Item I 50.3' 2 7,642' 3.00 3.865 3 7,643' 2.687 6.50 4 7,665' 3.00 4.50 5 7,666' 2.992 3.5 6 7,761' 3.00 4.25 Low, Strino Cameron, DCB, Tubing Hanger, 3-1/2" x 11", 5M, 3-1/2" EUE Lift Thread x Butt. Suspension Thread, Type "H" BPVP Crossover, 3-1/2" Buttress Box x 3-1/2" EUE 8rd Pin Kobe Cavity, 3", Type 'B', Parallel Dbl. SN: 231-1-10-97 Crossover, 3-1/2" EUE 8rd Box x 3-1/2" Buttress Pin 3 jts, 3-1/2", 9.2#, L-80, Buttress Tubing Wireline Entry Guide, 3-1/2" Buttress Box D 7526' 1.625" 2.270" 7540' 1.300" 2.750" 7541' 1.440" 2.200" E 7541' 1.375" 2.765" ELM A 7,632' 2.00 3.865 B 7,633' 2.00 2.375 C 7595' 1.688 WLM Trico jet pump cavity Baker Seal Assy and seal bore extension Baker K-22 Anchor Seal Assy Baker "FA-I" packer Short String Crossover, 3-1/2" Buttress Box x 2-3/8" EUE 8rd Pin Pup Joint, 2-3/8" EUE 8rd 6' Tbg perf gun stuck in short string, 21.5' long total fish PERFORATION HISTORY Interval Accum. Date Zone Top Btm Amt spf Comments ...... 1/_9~Z ........ 9:_3_ ......... _8;2_.1_6'__ ........ _8_,_2-.-6_6' .......... _$.0_'_ ............ _4_ ........ _S_ q. .u_ ..e g_z_e__d__7.-~ l :.8_6_ .......... ...... _1/9_F(._7_ ......... _C_-.3___ __._8_,.2__7..0.' ....... 8_,_2.9_6'__ ....... _2._6.'__ .......... __4_ ....... _S_queezed 7-31-86 1/9/77 .... C_-_4_. 8,307' 8,340' 33' 4 Squeezed 7-31-86 11/22/98 C-5 ........... -8,_4.6_7.:' ........... _8,__5_8__9.'_ ..... 122' . ........... .8 ....... _R__eP_~_rf_,?_l./_8-EJ_,.._O___d.e_g-_. 11/22/98 C-5 8,635' 8,660' 25' 8 Reperf, 2-1/8" EJ, 0 deg.___ 11/22/98 C-5 .... .8.:_6_7__8.'- ...... _8_, 7__4_ .4. . ~_ ......... _6_6.'_ ......... _8_ ...... _R_e. ped, 2-1/8" EJ, 0 deg: ..... 11/22/97 C-6 8,973' 9,000' .___2.7_'__ ........... _.8_ .......... R__epe__d.,_2-1___/..8"lEJ_,_O__d_eg:.__ 11/22/97 C-7 9,485' . ..... 9,__5_30__~_' ........ _45-- .......... 8 .......... _ReDed, 2-1/8" EJ, 0 deg__. 11/22/97 C-7 9,540' 9,795' 255' 8 Reperf, 2-1/8" EJ, 0 deg__ 11/22/98 _.._C.:_7_ ..... ___9_;..8.._8__0--_ 9,955' 75' 4/8/12 Rep_e_rf,__2-1/8" EJ, 0 deg_._. C-7 9,956' 10,045' 89' ___.4_/._8_ ..... Re_perf 3/31/85. PBTD = 10,310' TD = 10,860' MAX HOLE ANGLE = 25° @ 6,200' Anna 26 1-23-99 final dwg.doc DRAWN BY: TAB 05/08/02 7. iG RELEASE: · :-?_. LL DATA Casing: ~gl~ Hole Size M~---C~3/~!C;T. iNTEGKITY - P.AllT f!. TVD; Sec ar. '-aeore cica.1 TOC ' .'~,~\ ,. . "roe..(;,-,,.., x~%,~.,~s,~,,-s.,~ .'-. %mo'..~.~,,,.:.,.,> -,,,... ,,sa. ~~ ~0~ ',-,~'v..~. I' Cemen: Bond Log (Yes_._ or No) ~ ;.,,I,n. AOGCC_~:,...,..,,, ~., Fi!e_~_~_~__ ' %., · ~'~ i .... Produc:ion Lo§:., TTp. e t Evalua=ion ~ONCLUS iONS: ... : ~" . i Par: I1: ' ' ., · .' - ,rC~"'-frr( '%0-0o NOTE TO FILE In Re: Anna 26 (18742 #26)...PTD (176-077) Unocal has applied to convert this production well to an injector. Since the well does not have a packer in it, MI demonstration must be by other means. The well was drilled in late 1976 into early 1977. Lost circulation and several kicks are reported while drilling at 8211'. Casing was eventually set at that depth. The cementing summary is pretty complete. A temperature survey was run that indicated TOC at 6919'. After drilling out, lost circulation was again experienced. Losses were cured and 8-1/2" hole was drilled to 10344' where returns were lost again. 7" liner was eventually set at this depth. It is not noted if any sort of liner packer was run. No cement was reported above the liner top and it is noted that while returns were generally good, it was believed at least 40 bbls were lost running and cementing the casing. A bond log was run with the following comments reported, "Run CBL 10318'-7700'. TOC @ 8800'...good bond below 9050'... fair to good bond 9050'-8800'... little or no bond above 8800'." This bond log is available in the AOGCC files. The well was drilled deeper, but eventually PBTD was established by setting a retainer at 10310'. The well was completed in February 1977 pumping 673 bopd and 2 bwpd. A workover to clean-out the well and change the pump BHA was performed in December 1983. In April 1985, the pump BHA was changed again and zone C-8 re- perforated. In July 1986, a workover was performed to shut off a dramatic increase in water production and investigate casing integrity. After pulling the completion, a tight spot was encountered at 8254'. The casing was swedged out from 4-7/8" to 5-7/8" plus. Squeeze work commenced. Prior to squeezing, the annulus was tested to 2000 psi above an RTTS set at 7784'. 3 squeeze operations were performed with increasing pressures noted on each operation. After squeezing, the well was pressure tested above firm cement at 7850'. 230 psi was lost in ~ hour. As drill out proceeded, additional pressure tests were done. The well would loose pressure with the trend to decreasing pressure loss, however on the final test the overall pressure loss was nearly 700 psi in 30 minutes. The well was then completed. The work was partially successful. The oil rate was increased from 208 to 365 bopd and the water rate was reduced from 880 to 503 bwpd. Recent work on the well includes deploying a coil tubing jet pump in the short string in November 1995. Sometime after August 1997, a snubbing unit was used to pull and recomplete the well. Apparently, the coil jet pump was removed during that operation, however little information is in the file for this work. In January 1999, a coil tubing deployed jet pump was installed in the long string. It had been planned to be installed in the short string, however a perforating gun was lost in the short string in the early stages of the job. When that work was completed, production was reported at 82 bopd and 228 bwpd. As noted, a copy of the CBL run in late 1976 is available in the AOGCC files and Unocal has provided Xerox copies of the log. Examination of the log shows initial amplitude response for the 7" liner cement to be slightly below 8200'. From 8200' to 8385', Iow amplitude response is primarily limited to the casing collars. The interval 8385'-8418' exhibits the lowest amplitude between 8200'-8800'. Below 8790', the amplitude is generally Iow. A short section of the 9-5/8" casing above the liner top is presented on the log. Very Iow amplitude is shown, which would indicate excellent bond. Based on the bond log analysis, the remaining open perforations were effectively isolated when the well was drilled. During the 1976 work, no attempt was made to squeeze below 8370'. Although casing damage was discovered in the upper intervals, it is indicated that the squeeze work performed at that time was successful in shutting off some of the water production. Although a tight pressure test was never accomplished, the increasing squeeze pressures and the trend of decreasing pressure loss when testing during drillout are good indications of isolation. Based on the operational summaries and the bond log, MI is indicated. Subject to Unocal complying with the requirements of the attached "Procedures to Obtain Variances on Packerless Wells (version 4) February 9 2000", I recommend approval to convert Anna 25 (168-036) as proposed. Tom Maunder Petroleum Engineer GRANITE POINT ADL 18742 WELL NO. 26 MIDDLE K£NAI SANDS Pertinent Data: Spud Date: Surface Location: Subsurface Location: Elevation: TD: PBD: Casing: Perforations: Original 1-09-77 -~ Reperforated 3-31-85 Initial Potential: Initial Stimulation: Reservoir Data: Cored Intervals: DST Interval s and Resul ts: Log Inventory:· October 15, 1976 Leg 4, Slot 8, GP Platform Anna 771' FNL, 713' FEL, Sec. 12, TION, R12W, S.M. TD 1014' FSL, 2937' FEL, Sec. 1, TION, R12W, S.M. 105' KB-MSL 10860' MD, 10377' 10,310' MD, 9831' 20", 74~ CSA 622' x cement to surface 13-3/8", 54.5# CSA 2022' x cement to surface g-5/8", 43.5 & 40# CSA 8004' x 700 sx 7", 26#, N-80 liner 7728-10336' x 500 sx fi-38216-8266'~C-68975-9000"~£C-89895-10045'-/~° 8270-8296Y .~ C-7 9485-9530'} -~ 8307-8340" 5~ 9540-9795'~ ~ - 8469-8589~ 9888-9895~ a637-s660~~ 8680-8744~ 4jSPF Dresser Atlas C-7 9885-9895' C-8.9895-10045' Baker 673 BOPD, 2 BWPD, 837 MCFD Spot 1570 gal. 15% HC1 over perfs 9888-10,045' Spot 3000 gal. 15% HC1 over perfs 9485-9745' Spot 250 gal. 15% HC1 over perfs 9475-9000' Spot 2070 gal. 15% HCl over perfs 8469-8744' Core ~1 - 8470-8490' - C5 Core ~2 - 8495-8500' - C5 Core #3 - 10841-10860' DST ~1 10302-10683' Rec. 19 gal. SGCM IES 8000-10336'; 10338-10830' GRS 7211-10826' GRD 8000-10660' Temp surface-8211' Gyro 1800-7500; 8100-10318' CBL-GR-CCL 7700-10318 (CBL 140-2052) Dipmeter 8000-10336' STATE OF ALASKA ALASKA O( L AND GAS CONSERVATION',..,OMMISSION APPLICATION FOR SUNDRY APPROVALS ipe of Request: Abandon: Suspend: Alter casing: Repair well: Change approved program: Pull tul~ing: 2. Name of Operator UNION OIL COMPANY OF CALIFORNIA (UNOCAL) 3. Address P.O. BOX 196247 ANCHORAGE, AK 99519 4. Location of well at surface 771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM At top of productive interval 595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M. At effe~ve depth 10,310' Operation shutdown: Re-enter suspended well: Plugging: ,/Time extension: Stimulate: Va"~ance:,A Perforat-~'.'-: Other:. X 5. Type of well: Development: X Exploratory: Stratigraphio: Sewi~e: AUG 2 i 2000 953' FSL, 2898' FEL, Sec. 1, TION, R12W, At total depth Ataska 07; & Gas Co;re. C0mmiss~n 1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M. Allc~oi'a~e '¥2. Present well condition summary Total depth: measured 10860' feet ~' Plugs (measured) true vertioal 10377' feet 6. Datum elevation (DF or KB) 105' KB MSL feet 7. Unit or Property name Granite Point 18742 Middle Ground Shoals 8. Well number 26 9. Permit number 10. APl number 50- 733-20297-00 11. Field/Pool Middle Kenai 'C' Sands Effective depth: measured 10810' feet Junk (measured) true vertical 9831' feet ORIGINAL Casing Length Size Cemented Structural 622' 20" 1285 ax Conductor 2022' 13-3/8" 1600 ax Surfaco 8004' 9-5/8' 700 ax Intermediate Produotion Uner 2638' 7' 5O0 ax Perforation depth: measured .... See Attachment Measured depth 622' 2022' 8004' 10836' True vertical depth 622' 1990' 7600' 9857' true vertical See Attaohment Tubing (size, grade, and measured depth) Paokere and SSSV (type and measured depth) Short 3-112', N-80 @ 7638 Long.3-1/2' N-80 0 10860' Halliburton TBG PKR 0 7543' 1.75" 1.91# QT-700 Coiled Tubing @ 7518" 13. Attachements Description summary of proposal: Conversion to injector. , 14. Estimated date for commenoing operation 16. If proposal well verbally approved: Detailed operations program: BOP sketch: ,1 11 16. Status of well olassifloation as: Oi1: Gas: Suspended: Name of approver Date approved Service: 1'7. I hereby oortify~ true and correct to the best of my knowledge. Signed: " ' V' FOR COMMISSION USE ONLY · Conditions of approval: Notify Commission so representative may witness IApproval No. Plug integdty~_ . BOP Test ... Location clearance · Mechamcal Integrity Test ~f~ Subsequent form required 10- ORIGINAL SIGNED BY D Taylor Seamount Approved by order .of the Commissioner Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Procedures to Obtain Variances on Packerless Wells (version 4) February 9, 2000 It is preferred that wells have been shut-in for an extended period of time. Injection fluid will normally be filtered Cook Inlet water at ~55 deg F. 1. Do.a base line temperature profile from'surface to top of perfs. 2. Start injection - after 14 days, run a standard step-rate-test per SPE recommended procedure. Run test to maximum allowable pressure. Repeat step-rate-test after injection pressures have stabilized. 3. After 30 days of injection, run a temperature profile making stops as in the baseline survey (if appropriate) and hang recorder in well. Note: if the Stops used in the baseline profile are not appropriate, make appropriate stops in this profile and use in all subsequent surveys in this well. 4. After 48 hours, retrieve recorder and run a temperature profile from the perfs to the surface using the appropriate stops. 5. After retrieving the recorder,' run in hole with high speed recorder which was used for Step #1. 6. Compare the series of profiles to the baseline. 7. Evaluate ali data from the temperature profiles and the step-rate-test to determine if the there are indications of leaking casing and or upward flow behind the casing. 8. If the conclusion is that there are no casing leaks above the zone and no upward flow behind the pipe, the well can be put back on injection. 9. Daily injection 'rates and tubing and surface casing pressures will be recorded daily and reported to the AOGCC monthly. 10. If injection rates or pressures or surface casing pressure indicate the possibility of a casing leak, the well will be immediately shut-in and the AOGCC notified; future operations will then be as agreed. 11. The well will be tested every two years for mechanical integrity as in the above steps or by another procedure acceptable to. the AOGCC. UNOCAL ) ,: Anna ii.. Well No. 26 Actual Jet Pump Completion ns of 1/23/99 RKB to TBG Head = 33' :. ;., CASING AND TUBING DETAIL SIZE wr GRADE CONN ID TOP BTM. 20" 74 ]-55 Sm'~_~ 622' 13-3/8" 54.5 ]-55 12.615 Surfa~ 2,022' 9-5/8" 40 & 43.5 N-80 & S-95 BTC 8.755 Sm'face 8,004' 7" 26 N-~0 BTC 6.276 7728' 10,336' LS 3-1f2" 9.2 L-80 BTC SC 2.992 34' 7,761' SS 3-1/2" 9.2 1-80 . BTCSC 2.992 34' 7,632' 2" .156" wall I-IS-S0 Coil 'I"og 1.688 32' 7541' ·-: .. JEWKLRY DETAIL ]~'O'-' Depth ID OD Item 1 50.3' Oumtx~ DCB, Tubing Hanger, 3-1/2" x 11", SM, 3-1/2', EUE Lift Tbtv. ad x Butt. 8mpemion Thread, Type "H" Omsover, 3-1/2" Bu~.ss Box x 3-U2" EUE 8~ Pin Kobe Cavity, 3" ~ Type 'B', Parallel Dbl. SN: 231-I-10-97 Crossover, 3-1/2" EUE 8rd Box x 3-1/2" Butlze~ Pin 3 its, 3-1/2", 9.7~, L-80, Buttress Tubing V~tmline Entry Guide, 3-1/2" Buttress Box ( Cavity leak identified 7/25/98 = Fish Tubing 7585'-7591 7,642' 3.00 3.865 7,643' ~ 6.50 7,665' 3.00 4.50 7,666' 2.992 3.5 7,761' 3.00 4.25 7526' 1.62~' 2.2?0" 7540' 1.300' 2.750" ?$41' 1.44~' 2.200" 7541' 1.375" 2.765" A 7,632' 2.00 3.865 B 7,633' 2.00 2.375 C 759S' 1.688 WLM Trico Jet pump cavity Baker Seal Assy and seal bore extensi~ Baker K-22 Anchor Seal Assy Baker "FA-I~ packer Short Strinn Crossover, 3-1/2" Buttress Box x 2-3/8" EUE 8rd Pin Pup 3oint, 2-3/8' EUE 8rd 6' ~ ~ gan stack in short sh-Jn~ 21~' long total 6 tagged @ _ 9,962' 7n~/~8 _- 2.25 GR -. , Anna 26 1-23-99 final dwg.doc PERFORATION HISTORY Intewal Ao~um. Date Zone Top Btm Amt, spf Comments 1/9/77 C-3 8,216' 8,266, 50' 4 Squeezed 7-31-86 1/9/77 C-3 8,270' 8,296' 26' 4 Squeezed 7-31-86 1/9/77 C-4 8,.30,7' 8,340' 33' 4 Squeezed .7-31-86 11/22/98 C..5 8~467' 8~589' 122' 8 Reper[ 2-1/8' EJ~ 0 deg. 11/22/98 C-5 8~685' 8,660' 25' 8 Reperf, 2-1/8' EJ, 0 deg. 11/'22/98 C-5 8,678' 8~744' 66' 8 Reperf~ 2-t/8' EJ, 0 deg. 11/22/97 C,-8 8,973' 9,000' 27' 8 IRe@eft, 2-1/8' EJ, 0 deg. 11/22/97 C-7 9,485' . %530' 45' 8 Reper[ 2-1/8' EJ~ 0 deg. 11/22/97 C-7 9,5.40' 9,795' 255' 8 'Reperf, 2-!/8' EJ. 0 deg. 11/22/98 C-7 %880' 9,955' 75' 4/8/12 Reperf. 2-1/8' EJ, 0 deg. C-7 9,956' 10,045' 89' .4/8 Reperf 3/31/85. , PBTD= 10,310' TI)'= 10,860' ~"~! ....... % ~,,,[~'~,~ ' ~*'"' ~ '~-'~' F~'~ HOLE ~GLE = 25° ~ 6~00' AUG 2 1 2000 MD Zone Top Btm C-3 8,216' 8,266' C-3 8,270' 8,296' C-4 C-5 C-5 C-5 C-6 C-7 C-7 C-7 C-7 8,307' 8,340' 8,467' 8,589' 8,635' 8,660' 8,678' 8,744' 8,973' 9,000' 9,485' 9,530' 9,540' 9,795' 9,880' 9,955' 9,956' '10,045' Anna 26 Perforations 'I'VD Subsea Top Btm Top Btm 7,793' 7,839' -7,688' -7,734' 7,849' 7,867' -7,744' -7,762' Amt 7,877' 7,914' -7,772' -7,809' 8,027' 8,139' -7,922' -8,034' 8,187' 8,215' -8,082' -8,110' 8,224' 8,291' -8,119' -8,186' 8,513' 8,542' -8,408' -8,437' 9,011' 9,060' -8,906' -8,955' 9,070' 9,317' -8,965' -9,212' 9,405' 9,475' -9,300' -9,370' 9,475' 9,564' -9,370' -9,459' Comments 50' Cmt Sqz'd 7/31/86 26' Cmt Sqz'd 7/31/86 33' Cmt Sqz'd 7/31/86 122' 25' 66' 27' 45' 255' 75' 89' RECEIVED Description Summary to Convert Anna Producers into Injectors Anna 21 Gage Tbg. Run "Baseline" Temp Survey. Place on injection for 1 month. Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. Anna 25 · Gage Tbg. ~li.~:" Temp Survey. · Place on injection for 1 month. · Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. Anna 26 · Gage Tbg. · Run "Baseline" Temp Survey. · Place on injection for 1 month. · Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. Anna 32 · Gage Tbg. · Cut Tbg to drop guns. · Gage ring tag guns. · Run "Baseline" Temp Survey. · Place on injection for 1 month. · Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. Anna 37 · Gage Tbg. · Run "Baseline" Temp Survey. · Place on injection for 1 month. · Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. Anna 38 · Gage Tbg. · Cut Tbg to drop guns. · Gage ring tag guns. · Run "Baseline" Temp Survey. · Place on injection for 1 month. · Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT. A~aska 0;: & Gr,~s Co;:s. Co;r..,~ission Anchorage / : ! 11 44-11 ./ I / ! / / / // / //' 3 t / / I' .,/ // ~ I I / / I / ., ! / / I · 31, / / · / ! ,' / / / , .,. I 32; / / / // / / / / ~ / / / / · ./ I I ! ,. / / / / / ,, , , /; / / / / , i //'// f i , ; /// / , i ~ . I i,! / / /. , / / / /// / /. ,~r., 7RD2.' / ~ ~ ; ; ! ! :.a ' , ,'; / I / / K"~ ~.' I , ~ ,i / ; /, · i .: / / . ; / ~./, : / , ~ t, ,, t , I ~ '_J.'~ ! I i i I ! i / ! t ~ "'7 / t ////// /// . , / ,;, i , i i I / : i ii ! // / / / / / / /// / // / i / ~ / / / /;' / t/ I / / i .. i i :' i ,/ I / ,' , I ! i / , / / -.:---.C37/ ; , ,'/ ; / / / / i 1"*; i ! i ! i / , / , , ! ~ / ! i i I / / // / , / / i / i / i ., .;/ / / i / ! ! ,'! / // / · I I I I / I . / / ~./ / ' I I ; ,/ / II / ~; / / / , .,- 1/ / ' /~-." ~i'/ ," /I / ;' / I ,'~-. ; I/' / ' , / I I I // ,',// ,,,, / dx',' ~ ! / / / .'! i(/// '/ ~ , /// · / / // t/ ~ , I/ / ////. ..,,/,, ; / /// / i/ ,/ / / / / / / / / / / / / // / .,' ,, / / / / /' , / . ,, / ..," / .,/ / .; , ,i / ./ / / / / / / / / / I / 1/ / / / / / , ,'",, ,"- / '"'/ "/ "/ '"/ ;' ii /' /' / / -'/ , / // / / ,/ / ,,,(_ ,.-' .... ,,,,, ,/, ,// / / / / ,,, ,/ / ,,,, ~ ~.t...,,,.,~4 v i ! , ...... , / -- , , , , , i -~ /' / / / / / / / / / / ~,. / I :' "'" "' /' ' / / /" '/ " ,' ," AUG 21 ,0~.,0 // / ~..."'.,~' // /' /' _/ / / / / ! / / , ' " //i " ..... "~' '"' '" ' " " / '" / / ' " .......... -/" .... ." / -' / / ' / -' / ' Alaska Oi{ & Gas Cor'~s.C~mmission i ~ ..... - ,.. / / . I / / / / / / / 'i ~,_,....,.--'"' ......" ..,' ..../ / / ./,, / / , ,, Anchorage ,, ~. /~..-.."' . ..... ../ .......... / I ,' / / , , / / , '.....//...-'" ..:...:; ....... // ,. / ,' ,, ,, ,, ,,' i ! /~' ....... ..,,.: .... .,/ / / / / / / , ,. ~ { STATE OF ALASKA ( .. ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY' WELL OPERATIONS 1. Operations performed: Operation shutdown: Stimulate: Plugging: Perforate: Pull tubing: Alter casing: Repair well: Other: X 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Unocal Development: X KB 105' above MSL feet 3. Address Exploratory: 7. Unit or Property name P. O. Box 196247 Strafigraphic: Anchorage, AK 99519-6247 Service: Granite Point 18742 4. Location of well at surface 8. Well number 771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM Anna-26 At top of productive interval 9. Permit number/approval number N^ '-/0' o'77. At effective depth 10310' 10, APl number 963" FSL, 2898' FEL, Sec. 1, T10NR12W, SM 50-733-20297 At total depth 11. Field/Pool 1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, SM Middle Kenai 'C" Sands 12. Present well condition summary Total depth: measu red 10860 feet Plugs (measu red) true vertical 10377 feet Effective depth: measured 10310 feet Junk (measured) true vertical 9831 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 622' 20" 1285 sx 622' 622' Surface 2022' 13-3/8" 1600 sx 2022' 1990' Intermediate 8004' 9-5/8" 700 sx 8004' 7600' Production Liner 2608' 7" 500 sx 7728'-10336' 7343'-9857' Perforation depth: measu red 8467'-8589', 8635'-8660', 8678'-8774', 8973'-9000', 9485'-9530', 9540'-9795', 9880'-10045' true vertical 8033'-8148', 8191 '-8215', 8232'-8323', 8516'-8542', 9016'-9060', 9070'-9321 ', 9405'-9568' Tubing (size, grade, and measured depth) 3-1/2" long string, 9.2#, L-80 @ 7761', 2" HS-80, .109" wall coil tubing @ 7541' Packers and SSSV (type and measured depth) Baker 2" x 3-1/2" FA-1 Perm Packer @7541' in the long string 13. Stimulation or cement squeeze summary ~.L~. ~ Intervals treated (measured) ~[S~'~ C.iJ &,~ ._Gas Cons. Commission Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection Data OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 140 3500 jet pump Subsequent to operation 82 228 140 3500 jet pump 15. Attachments: 16. Status of well classification as: Copies of Logs and Surveys run: Daily Report of Well OperaUons: X Oil: X Gas: Suspended: Service: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge: ORIGINAL Signed: ~~~/ Title: Drilling Manager Date: Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ~ ®® Anna Well No. 26 Actual Jet Pump Completion as of 1/23/99 RKB to TBG Head = 33' = Fish Tubing Holes 7585W591 SIZE CASING AND TUBING DETAIL Vcr GRADE CONN ID 20' 74 J-55 13~3/8" 54.5 J-55 9 5/8" 40 & 43.5 N-80 & S-95 BTC 7" 26 NS0 BTC Tubing: LS31/2" 9.2 I. 80 BT(' SC SS31/2" 9.2 L-80 BTC S( 2" ./56" wallHS-8() Coil Tbg 2 7,642' 3 7.64Y 4 7.665' 5 7,666' D 7526' 7540' 7541' ELM TOP BTM. Suiface 622' 12.615 Surt'ac¢2,022' 8.755 Surface 8,004' 6.276 7728' 10,336' 2.992 34' 7,761' 2.992 34' 7,632' 1,688 32' '7511' JEWELRY DETAIL ID OD Item EUE Lill Thread x Butt. Suslxmsion Thread, yype "H" BPVP 3.00 3.865 Crossover. 3-I/2" Buaress Box x 3-1/2" Et't£ 8rd Pin 2t~47 6.50 Kobe Cavity, 3", T)~' 'B', Parallel Dbl. SN: 231 I 10 97 3.00 4.50 Crossover. 3~ 1/2" EUE 8rd Box x %1/2" Buttress Pin 2.992 3.5 3 .its, 3-1/2", 9.2#, I.-80, Butlress Fubing 3.00 4.25 Wireline Entry Guide, 3- I/2" Buttress Box 1.625" 2,27{}" Trico jet pump cavity 1.30t~'2.750" Baker Se'al Assy and seal bore extension Short Siring A 7,632' 2.00 3.865 Crossover, 3 1/2" Butlress Box x 23/8" ErE 8rd Pin B 7.63~' 2.00 2.375 pup Joiat, 2-3/8' EUI': 8rd C 7595' 1.688 6' Tbg perf gnn st~lck in short s{rillg? 21.5' long PERFORATION HISTORY ], spf {Comments 1/9/770-3 8 216' 8~66' 50' 4 S~ueezed 7-31-86 1/9/77C~3 8,270' 8,296' 26' 4 ~sHe~ ~ J28 1/9/77_ C~4 ~ 8,307'~ 8,340'. 33'~ 4 ~S~u~Rd. 7-~Jz8 tl/22/98 C-5 8,678'i 8,744'~ 66' 8 Reped, 2-1/8" EJ, 0 de 11/22/97 i C-7 9 540', 9,795', 25~' 8 Roped, 2-1/8" E J, l t/22/98C-7j 9,880' 9,955' 75'~ C-7 9 956' t0 045' 89' 4/8 Reped 3/31/86, PBTD = 10,310' 'rD = 10,860' MAX HOLE ANGLE = 25° ¢~ 6,200' Anna 26 1-23-99 dwg,doc DRAWN BY: TAB 02/08/99 1/8/99 1/9/99 1/10/99 Anna Well An-26 Daily Summary of Operations RU slickline unit on AN-21 long string. RIH with standing valve to 5000' and shake off (fluid level at 2400') RD from LS and RU on SS. Attempt to circulate down LS and up SS but no returns. RU on LS and and RIH with setting tool to standing valve at 7673'. Jar down to seat standing valve. POOH. Circ down LS and up SS with 58% returns. RU on SS and RIH with braided line brush dressed to 2.992" x 5' long. Reciprocate every 100' from surface, set down at 2451' and work tool down to 3751', fell free to tubing crossover at 7634'. POOH and circulated down LS and up SS during brush run. RIH with 2.80" gauge ring and sat down at 2890', jar free and fell to 3751 ', jar free and fell to crossover at 7634'. POOH with 2.800" gauge ring. Circulate down LS with returns up short string (1-1/2 ss tubing capacities). RIH with 2.80" gauge ring in SS to 7634' while circulating down L$ and up SS at 3A BPM. PU and work area from 3500' to 4500' while continuing to circ. POOH. Circ down L$ and up SS 1-1/2 SS tubing capacities. RIH with 2.765" x 3' long dummy gun in SS to 7634' (no set downs but slower from 3500' to 7634'). POOH with dummy gun and circ down LS and up SS 1-1/2 SS tubing capacities. RU on LS and pull equalizing prong from standing valve at 7658'. RIH and latch standing valve body at 7658'. RIH with 2.80" gauge ring in L$ to 7643', POOH. RIH with 2.765" x 3' dummy gun to 7643', POOH. RD slickline from AN-26. Attempt to pump final flush down SS but SS would not take fluid at 2600 psi. 1/14/99 1/15/99 RU APRS E-line unit on An-21 ss. RIH with 1-9/16" hollow carrier tubing perforating gun, 6' long and 22 shots. Gun misfired, POOH. Found bad cap and rearm gun. RIH and perf SS tubing at 7585'-7591'. Gun was stuck at 7577' and SS on vacuum. Allow well to equalize and gun was still stuck. Fluid level in 9-5/8" at 1732'. Drop standing valve in LS. Pumped down LS and pressure increased to 500 psi before breaking back and fluid returns to surface in short.string and annulus. Pump 10 bbls down SS and gun still stuck. Resume pumping down LS and work wire to weak point failure at 1500 lb. POOH with all of wire. RU slickline on An-26 SS. RIH with short 1" overshot grapple, latch fish at 7599'. Jar on fish with loss of spang action at times. Sheared off and POOH with no recovery. Repin same tool and latch fish with same result, no recovery. RIH with 2-1/2" JDC and catch fish at 7595'. Jar for 1 hour with no progress, jar down to release and POOH. Decide to set packer in long string. Left 21.5' long fish in short string. RD from SS and RU on LS. RIH and pull standing valve equalizing prong. RI.H and retrieve standing valve body. RIH with 2.765" x 3' dummy gun to 7600' with no problems. RD slickline and RU APRS E-line on LS. RIH with Baker FA 3-1/2" packer. Set packer at 7541' in long string. POOH and RD APRS. 1/20/99 Spot Dowell coil tubing equipment on board 1/21/99 NU adapter Versatech adapter spool and CT BOPE. Test CT BOPs to 250 psi/4500 psi. Fluid level in annulus at 2104'. Install Baker CT connector and pull test to 31,000#. MU jet pump BHA with isolation sleeve on bottom of 2" coil. An-26 daily summary.doc Page #1 02/08/99 1/22/99 Anna Well An-26 Daily Summary of Operations Load coil with CaCl and pressure test BHA to 2600 psi. MU Baker Seal ^ssy. Blow down coil with N2. RIH with coil and BHA to 7400'. Shut down 7 hrs for rest. Continue RIH and latch anchor at 7545' CTM. Pressure test annulus to 1000 psi. Shear out seal assy from upper seal bore with 7500 lb overpull. Retest annulus to 1000 psi. PU 8' and retest annulus to 500 psi. PU and verify seals are out of seal bore. Sting back into seal bore and retest to 1000 psi. Mark tubing for spaceout. PU 20' and cut coil, install Versatech hanger and G$ running tool. RIH and land hanger, pressure test annulus to 1000 psi. Release GS running tool and rig down coil tubing unit. 1/23/99 RU slickline and pull Trico isolation sleeve from jet pump cavity. RIH with standing valve to 2000' (fluid level at 1850') and drop standing valve. RD slickline. Drop jet pump and begin producing well. An-26 daily summary.doc Page g2 02/08/99 .~. -22-97 FRI 01:09 PI1 p, To -- : Mr. Jack Hartz - AOGGC, Fmc Dan Williamson On August 28, 1997, Unocal Alaska will mobilize Hydraulic Well Control's hydraulic workover unit to Baker Platform to perform a pump and tubing change on Baker Well 13. Upon completion of this work the unit will be sent to Anna Platform to perform the same task on Anna Wells.~5, 2_~6, and $8. These wells are all no flow wells, having no packer or safety valve ~n them.'7' Our data shows that the Anna wells are extremely subnormal pressured (1,840 psi at 8,200 ft TVD), have a high water cuts and produce very little gas. The Baker well is higher pressured but will be readily killed with filtered inlet water; it also has a high water cut and produces very little gas. The hydraulic unit will be on each well for a brief time. The wells are not considered by Unocal Alaska to be a high well control risk. We respectfully request the following variances be granted: 11 To employ the use of 2", 5M, Steel Molded Lines and Fittings with 1502 ~,,v~ Weco Unions for service as a Kill Line and Downstream Choke Line. To use the production Iow pressure separator system as opposed to the ,,xx ~~yltx use of a "Poor Boy Degasser". . Drilling Superintendent Post-it® Fax Note 7671 )ate ,~/...,-- I # of · , r -- ------'- Phone"'~--~ Page 1 of 1 -- p Unocal Energy Resources D~' ,n 909 West 9th, P.O. BOX 1962,. Anchorage, AK 99519-6247 Telephone (909) 276-7600 Fax (907) 263-7828 U OCAL Debr~. Chltders C~erk ,DAYA TRANSMITTAL 96-13 June 6,1996 ....... i i[ To: IHoward Oakland 3001 Porcupine Anchorage, AK 99501 [ A!aska Oil & G.as From: Debra Childers 909W. 9th Avenue Anchorage, AK 99519-6247 Unocal Transmitting the following items. , , [[ ?~1~ Granite Point/"Anna-21 " . :' fil¢i~ blackline'" COmpletion RecOrd 4/01/96 -0'/1 Granite Point / Anna-26 rrll'm / blackline ~' Tubing Packer Setting"Record 4/20/96 Granite Point / Anna-36 f~, blackline," Completion' Record 5/20/96 l,t~"-Granite Point / 42-23 RDr11"m / blackline.*''' Perforating iDepth Control 2/17/96 ~r~"_jTrading Bay Unit K-26 RD film,,/'blackline~' Main Pass (Co!lar Locator) 3~23/96 l~_~_ Trading Bay Unit M-5 ¢if2m / blackline~'.Complet!on Record 2/14/96 Trading Bay Unit M-25 t,B'n / blackline,.- ~:;ompletion Record 4/24/96 ~radi~g Bay Unit M-25 ~ifrfl"/blacklinec- ~'ompletion..Record' 4/30/96 Tradi. ng Bay Unit..G-21 ~,,blackline,,~ COL/Gamma Ray 4/03196 Trading Bay Unit G-21 fSrf~ blacklin~,,-" Cement Retainer 4/08/96 Trading Bay Unit G-21 .,fll'm/blackline.," Completion Record 4/13/96 Trading Bay Unit G-21 ~ / bla'ckline~,,,Completion Record " 4/18/96 Trading Bay Unit G-21 f~ / blackline,," Completion Record '] '4/22/96 Trad[ng Bay Unit G-21 ~ffflm / blackline~- Completion Record I 4/25/96 Trading ~,a~/Unit G-21 6i~/blackline--" Completion Recordl2 I/8 Fnerget "°~";~-'- i' '"': TM''';~'''' ~'''~ Trad!.ng Bay Unit G,21 d,~ / blackline,.,-Gamma Ray/TemPerature ~ 4,'i0/-~6 Trading Bay Unit G-21 ~4¢'r~ / blackline'''' Tubing Cutt. er 4/08/96 ,"~,,,., ~, ~,/' -,.,,.~.,.-, ,~, ~J ¢ ~z :~ ff:l .-'4 J ¢!1'm / blackline,.- Completion, Record 5/17/96 · ,, , ,, i ~e.c¢iv~.d hy-Please acknowle~/~~Tipt by ygningi~l~jandptuming~] one ~opy.of this ~ansmittal[Date:or F~ to (907)263-7828jU~ ~] ": ...."~' ~'" ' "' "'"'"' '"':"'""'""':' :':?:' "? ?""'" ' L=:~' ";:?"~~' "' ...... ';'-"" ::"'":""' "" "' ':~'" ""'d'~'"'" ~'.;'. ....... ..... ,~';. ,;C.E.~ ... ,..:. :~.~........ ;.; ....... ;'~, ;~.~¢'~;...~:,'~;,~,~';~..~,..~..~.~,~ ~ .~ ,..~ ~. ..~, ~,.~.~,~,.~t~.~..:,f..~ .~ ~' ...-~-,~ ..... ..~.,,~... v ...- .,......,.,~, ,. ,.,...,.' ................... ,. ............. .,,~; ........................... ,,.,,.,,~.::,.,. ...... ,~,. ,.,,.,~ ............. ,,,~,.,,~ .... ..,,~~~ ~ ........... ,, ............ . ............ ~.,., .......... ....~ ....;.......- .... ...:. ...... ......... ....,..:,:...... .......... ........ ........ . ............. _, ............ . ...... . ........ , ........ . . . .. . . . . .. .... ...........,.......,..~., ,.........,.~,.' :, (.... %;...,.; ...,...;.;..;~. ,.,:.~ ,..'..~,,~.,. =. ;,, ,,,..,,.;..,..,.; ,,;,,:..., .: ....... :,-., ,~.. ;......, '.~.,............. ., . ...... .. . ................................................. ;.:~" .' ~. ... .. .,,..¢ .. ~,¢ ~,~.~`~.=,~=~.=..~¢~=~.~=;..&~~~*~¢~~1~¢=~.~=.~¢~¢.~....~`..~==.:Y~=.....~. ....... ..:.~... ........ .....:..,.,....:.....,~.......:..........,=,....: ......... .~;~,~.~.... J:~.~'(.:"".i"~' '~.','' :":....W"'.ft'..';..'..": ";."..'":'~"~,~t~'.:~%~¢'.~; ...... '+" "*" '''f ''t> '' ~"' '' Unocal Energy Resources DJ[ 909 West 9th, P.O. BOX 196247 Anchorage, AK 99519-6247 Telephone (909) 276-7600 Fax (907) 263-7828 Jn UNOCAL Debra Childers Clerk DATA TRANSMITTAL 96- 5 February 21, 1996 i To: Larry Grant 3001 Porcupine Anchorage, AK 99501 Alaska Oil & Gas From: Debra Childers 909 W. 9th Avenue Anchorage, AK Unocal 99519-6247 Transmitting the following items. GP A'26 BLACKLINE/FILM 2/14/96 TUBING PACKER SETTING RECORD A26 COIL TUBING W/O GP 42-23 RD BLACKLiNE / FILM 2/11/96 COMPENSATED NEUTRON / GR z..- ,, GP 42-23 RD BLACKLINE / FILM 2/08/96 SQUEEZE PERFORATING RECORD ..~ GP 4~2'-23 RD BLACKLINE / FILM 2/~38/96 DRILLPIPE CONVEYED GAMMA RAY GP 4.2723 RD BLACKLINE / FILM. 2/11/96 CEMENT EVALUATION LOG / GR~ II I I Please acknowledge~cej~t by sig~ng Received by: ~ ~ ~nd_re~ing one copy of this transmittal or FAX to (907) 26~-~'-~8 ~ _ ~,~,~.  ' I"L~' ~,~ I;3~I Date: STATE OF ALASKA ALASKA 011~...,qB GAS CONSERVATION CON(',...~SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing After casing Repair well 2. Name of Operator UNION OIL COMPANY OF CALIFORNIA (UNOCAL) 3. Address P.O. BOX 196247 ANCHORAGE, AK 99519 4. Location of well at surface 771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM At top of productive interval At effective depth 10,310' 953' FSL, 2898' FEL, Sec. 1, T10N, R12W, S.M. At total depth 1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M. Present well condition summary Total depth: measured 10860' true vertical 10377' Effective depth: measured 10310' true vertical 9831' 12. 5. Type of Well: Development Exploratory Strafigraphic Service Perforate Pull tubing Other X 6. Datum elevation (DF or KB) 105' KB MSL 7. Unit or Property name Granite Point 18742 8. Well number 26 9. Permit number ~ ~-77 10. APl number 50-733-20297 11. Field/Pool Middle Kenai "C" Sands Plugs (measured) Junk (measured) ORIGINAL Casing Length Size Cemented Measured depth True vertical depth Structural 622' 20" 1285 sx 622' Conductor 2022' 13-318' 1600 sx 2022' Surface 8004' 9-518" 700 sx 8004' 7600' Intermediate Production Liner 2608' 7" 500 sx 10336' 9857' Perforation depth: measured true vertical See attached Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) ShOrt 3-112", N-80 @ 7638 1.75" 1.91# QT-700 Coiled Tubing @ 7518' Long 3-112" N-80 @ 10060' Halliburton TBG PKR ~ 7543' 13. Stimulation or cement squeeze summary NIA NOV 0-3 i99'5 Atast~ Oil .& Gas ,Cons. Comn , 'Anchoraoa Intervals treated (measured) N lA 14. Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Data Tubing Pressure Prior to well operation Nov. 9, 94 376 98 248 250 2993 Subsequent to operation 102 373 372 100 3390 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil x Gas Suspended Service 17. I hereby certify that the foregoing iR true and correct to the best of my knowledge. Signed G. Russell Schmid~_~._~~.~b Drilling Manager Date November 7,1995 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 'ANNA Btform Leg 4, Conductor 8 Tyonek S~:nds AN 26-2 Granite Point Field APl 50-753-20297-00 ,,. ADL 18742 Tbg H~ r ng Depth 32,00 Ft, Mox. Dev. At Perfs. 21 Deg. 40,0- 622.0' 20" OD 74.00t/ft J-55 CS(; 56,7-2022,0' 15,575" OD 54,50~/fl J-55 PROD CSG 52,0- 200.9' 9.625" OD 45,50t/ft S-95 PROD CSG 200,9-4464.7' 9.625" OD 40.OOt/ft S-95 PROD CS(; 4464,7-8001,5' 9,625" OD 45,50t/ft S-95 PROD CSG 7728,0- 10556,0' 7,000" OD 26.00t/fi N-80 LINER 10059.5' 5.500" OD 9.20~/ft N-80 TB6 LONG STRING 55.0-7626.8' 5.500" OD 9.20t/fl ~G SHORT STRING 7628.0- 7657.9' 2,575" OD 4.60t/ft lBO SHORT STRING 55.0 - 7518,6' 1,750" OD 1,552" ID lB(; COILED TBG 7518.6 - 7546,0' 2,200" OD 1,610" ID lBG CT COMPLETION t, lOV 0 8 1~95 Oil & I~as Cons. ComTnissio~ Anchorage KB ELEV: 105' PBTD: t0510' TD: 10860' Pumpin9 Oil Well Spud On 10/15/76 Lest W/O 4/19/95 ANNA F'lalform leg 4., Condudor 8 yonek Sands AN 26-2 Granite Point Held APl 50-733-20297-00 ,,.. ADL 18742 Tb9 H~u~ r'n9 Depth 32,00 Ft. Max. Dev. At Perfs. 21 Deg. Z~5.0 - 7656.7' 5.500" OD 9.20t/ft N-80 TBG LONG SI'RING 33.0- 7626.8' 3,.500" OD 9.20t/ft TB6 SHORT STRING 7628.0- 76,],7.9' 2Z" OB 4.60t/ft TBG SHORT STRING 33.0 - 7518.6' 1,750" OD 1.532" ID TB6 COILED 7518.6 - 7546,0' 2.200" OD 1,610" ID 'i'B6 Of 60MPLETION NOV 0-3 /995 Atas~ Oil & Gas Cons. Commissio~ Anchorage KB ELD/: 105' PBTD: 10:310' TD: 108[~0' Pumping Oil Well Spud On 10/15/76 Lost W/O 4/19/95 ANNA P atform Leg 4, Conductor 8 Tyonek Sands AN 26-2 Granite Point Fie d APl 50-7~5-20297-00 ,- ADL 18742 Tbg H~u. Flng Depth 32,00 Ft. Mc~x. Dev. At Perfs. 21 Deg. 33,0 - 7518.6' 1.750" OD 1,532" ID TBG COILED TBG 7518.6 - 7520.6' CROSSOVER Baker Coiled 1'bu. Connector 7518.6 - 7546.0' 2.200" OD 1.610" ID 'I'BG CT COMPLETION 7,524.5- 7525.4' 1.900" OD 1.149" ID LANDING NIPPLE Hallburlon "N" W/C Pump l 7529,4 - 7530.0' 2.200" OD CROSSOVER 1,90I' NU lORD B x 1.25" EU P 7530.0 - 7532.4' 2.75" OD 1,377" D HYDRAULIC PUMP Trico Jet Pump Cavity 7552.4 - 7533.0' 2,500" OD 1,100" D CROSSOVER 1 1/4" NU P x 1.9" EU P 7555,0 - 7534.0' 2.575" OD 1,755" ID SEALS MSN Se~l Unit 7553.0 - 7540.5' 2.800" OD 2,380" ID PBR S~LS 7554.0 - 7535.0' 2.375" OD 1,735" ID SEALS MSN Seel Unit 7555.0 - 7557.0' 2.750" OD 2,380" ID PBR SEALS Seel Extension 7555.0 - 7557.0' 2.575" OD 1,735" ID Seel Ex'[. 7537.0 - 7538.0' 2.375" OD 1,755" ID SEALS MSN Seel Unit 7539.0 - 7539,6' 2,575" OD 1,065" ID PLUG Pump Out Pug KB ELEV: 105' PBTD: 10510' 'I'D: 10860' 754L4 - 7545,8' 2,765" OD 1.310" D PACKER H(]llibur[on Repe(]b Tbg. Perch 7543.4- 7545,8' PERFSUB 7545.8 - 7546.0' 2,650" OD BULLPLUG [:'.. ,. ,, ~,., ii.: 12 [~:OV 0 8 i995 .Oil .A Gas Cons. C.o. mmiss]~ 'Anchorage' Pumpng OI Wet Spud On 10/15/76 Lest W/O 4/19/95 11. Perforations ~.c-4 C-5 C-6 C-7 C-8 Measured Depth 8,216-8,266 8,270-8,296 8,307-8,340 8,469-8,589 8,637-8,660 8,680-8,774 8,975-9,000 9,485-9,530 9',540-9,795 9,880-10,045 True Vertical Depth 7,798-7,845 7,849-7,873 7,883-7,914 8,035-8,148 8,193-8,215 8,234-8,323 8,518-8,542 9,016-9,060 9,070-9,321 9,405-9,568 f,~OV 0 8, i995 ' & Gas Cons. Anchorage ANNA 26 DAY 1 (4/16/95-04117/95) RU ATLAS WIRELINE ON ANNA 26 SHORT STRING PRESSURE TEST LUB TO 500 PSI & 2500 PSI. OK. RIH W/HALLIBURTON PBR & SEAL BORE EXTENSION. TROUBLES PASSING THRU TREE. WORK THROUGH. CONT RIH & SET BOTTOM OF PBR @ 7546' (WLM) BETWEEN TOOL JOINTS. DAY 2 (04/18/95) RU CTU ON SHORT STRING. TEST BOP & COIL. RIH W/SEAL & SHEAR OUT ASSBY ON 1.75" COIL. TAG PACKER @ 7546'. SPACE OUT COIL & INSTALL HANGER. STAB INTO PACKER. TEST HANGER. CIRCULATE KCL & SHEAR COILED TBG. ND BOP & INSTALL VALVES. SHEAR PUMP OUT PLUG. RD CTU. ~OV O o ~5 Alask~ 0il & Gas Cons. Commission Anchorage W. G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage. Alaska 99510 907-272-8471 September 12, 1986 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Conmdssion 3001 Porcupine Drive Anchorage, Alaska 99501 File: FEW-224-WF Dear Sir: Report of Sundry Well Operations Granite Point 18742 Well No. 26 Platform Anna~ Cook Inlet, Alaska Attached in duplicate for your records is a State of Alaska Form 10-404, Report of Sundry Well Operations, outlining work recently completed on GP 18742 Well No. 26. Questions concerning this report may be directed to Jeff Blagg at 562-2147. Very truly yours, W. G. Smith District Manager JCB/dds Attachments 110/jcb1 ,. RECEIVED S EP 1 ? 1986 Alaska 0il & Gas Cons. Commission Anch0ra:e ' STATE OF ALASKA ALA~'~ .~ OIL AND GAS CONSERVATION COI~.'j SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate I~ Pull tubing Alter Casing ~ Other [] Cement Squeeze 2. Name of Operator Amnr_n Prndur_tinn Cnmoanv 3. Address P.O. Box 100779, Anchoraqe, Alaska 99510 4. Location of well at surface Leg 4, Slot 8, GP P1 at. Anna 771' FNL, 713' FEL, Sec. 12, TiON, R12W. S.M. At top of productive interval 8216' (7798' TVD) 691' FSL, 2512' Sec. 1, T10N-R12W, S.M. 10,310' (9,831' TVD) 963' FSL At effect2~98~iPtFEL,iWd h Sec. 1, T10N-R12N, S.M. 10,860' (10,377 TVD) 1,014' FSL At total ~, FEL, Sec. 1-TlON-R12W, S.M. FEL 5. Datum elevation (DF or KB) 1.05' KB, MSI 6. Unit or Property name Granite Point 18742 Feet 7. Well number 26 8. Approval number 214 9. APl number 5O-- 733-20297 lO. PO~ddle Kenai "C" Sands 11. Present well condition summary Total depth: measured true vertical Effective depth: 10,860 feet Plugs (measured) 10,377 feet Casing Structural Conductor Surface Intermediate Production Liner measured 10,310 true vertical 9,831 Length Size 622' 20" 2022' 13 3/8" 8004' 9 5/8" 2608' Perforation depth: measured feet Junk (measured) feet Cemented Measured depth True Vertical depth 1285 Sx 622' 622' 1600 Sx 2022' 1990' 700 Sx 8004' 7600' 7" 500 Sx 10336' 9857 ' true vertical See Attached Perforation List Dual 3{" N-80 at 7638', F single 3{" N-80 Tubing (size, grade and measured depth) Tai 1 pipe at 10060'. EECEIVEO Packers and SSSV (type and measured depth) None 12. Stimulation or cement squeeze summary 8216-8266; 8270-8296; 8307-8340' Intervals treated (measured) $ EP 1 7 1986 Alaska 0il & Gas Cons. Commission Anchorage vo e e d i es re Treatrr~[j~~ti~lir~drj~¥s {t~ Ss~~ dc~e~a~[{~i~ pi2 stage block type cement squeeze, pe; final pressure 2,000 psi. 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 208 117 880 100 70 365 176 503 100 70 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~/1~' ~, "~ ~ - ~''~' Form 10-404 Rev. 12-1-85 Submit in Duplicate 11. Perforations CE~m-r CIC-3 ~.~..~L)EE'~E~ -4 C-5 C-6 C-7 C-8 Measured Depth 8,216-8,266 8,270-8,296 8,307-8,340 8,469-8,589 8,637-8,660 8,680-8,774 8,975'9,000 9,485-9,530 9,540-9,795 9,880-10,045 True Vertical Depth 7,798-7,845 7,849-7,873 7,883-7,914 8,035-8,148 8,193-8,215 8,234-8,323 8,518-8,542 9,016-9,060 9,070-9,321 9,405-9,568 SEP 1 7 1986 Alaska 0il & Oas Cons, Goi'nmis,~i~n Anchom[te AMOC '~; c-q,f;r.,U~-l-iON COMPANY 'DENVEF' RE~E)N .~*.~ ANCH:.JRA6¥ STRiC'F ->*:~. .,. CHRONOLO0~ I CAL REPORT 09/08/86 ~.~ PAO. E ~ ~.~. ..!O:.'i; ?"J~TIATION REPORT' COM!:'~''' - .,-,:'~, OPERATED REPAIR '"""'"-' ..... · -. ~.~ :.,,, ~.~ OPPiE NT .... - ~:.-..-.,...--.:-..,-,,-, r.-. .... . ...... p '-~'"'"' 1. ~' r'~,' ,':.' .'., ,.:~."-~,.2d' ? ,.' :..-",~' :''.-~.: .. ; ",~P,l".i'.i'.2'FE PE;ri'jT, ,-'.:',..~',-.r~.: .,.T · .--, r.- STATE .... ...,.r-..A¢4.~ ~_ POT .... 1874~., ~,.',="", KEt',AI-" 0,';,-. '~ ~ ....... - ~,'~ t.~ ''~ ,"' --. ,.. . ¢F'iEi:k ~-.. ;:..~!:' ¢., ,u......: PROD' ¢'~- AtlTP.i~... i-,"~'~' 7 ?'f]N-,,.jr,, .... ,..,. ZONE' Oi -- (:;RANiTE.' POINT ~,874.2,~ :It-2& AU'i'¼ "" '~ '"'~- .,.,~:_ 06/20/*-36, AUTH COST A. 474000 .-~-~-~. CON'i'RAC TOR < S) i NFORMAT I ON' PARKER-ANNA, 0150 SEP 1 7 1986 Gas ~ns. Commission DEr~VEE' · _ . REOION *** A:qLHdEAGE DISTRICT ~. 09/08/86 *~.~ PAQE ORANiT'E POINT 18742 #26, QRANITE POINT, PARKER-ANNA 1.50, AMOCO PRODUCTION, ~ AC E.~730,_9-01-1 APl 5-73~0~700, ~UTH TD 10860, ~UTH COST ........... OPSR.AT~E1NS- TD I0860 FT, PBTD 10310, L. OO W/DRESSER PDK-IO0 TOOL COS'~''''t=:. DALLY WELL s~650,' CUM WELL $1650 ........... LL==~ r;iJMP. RIggED UP W. =. .{CAMCO}. PULL S.V. RUN IN HOLE W/3/4 IN. SINKER BAR. TAg FILL AT 10138 WLM. R IOOED UP DRESSER ATLAS ELECTRIC LOOQINO UNIT. RUN IN HOLE X TIE IN OSilqg OAPiMA ~' " nA~ SONIC ~ OQ DATED lq/~3/76 ' RdN DRESSER POP,- LO~ F/'~0080 FT TO ~ =u.~.w KT. NOTE: QAMMA RAY INDICATES WATER BREAK THROUQH 8~50-8350. - CHiP. liN T):F!E DISTRIBUTION (HRS)' :s.i rW~ - LOQ, W/DRESSER A~LAS dO~-) ZNiTZATION REPORT: DIRECTIONAL HOLE CURRENT WELL ACTZVZTY-AUTHORiZED, DATE 03/1~/85 -:'.'~--~'~ 07/i 9186 QRANITE POINT 18742 #26, ORANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-1, APl 50'73320~9700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OP'ERATIONS: TD 10860 FT, PUbtPINQ COSTS: DAIL~ WELL $10814, CUM WELL $I~464 ,,.:hARKS' NOTE~ POWER OIL WEIQHS 6. 8 PPO. ,~RON TIME DIS"FR!I~UI'iON 8. O0 - LO0~ COMPLETED LONQ STRINO W/DRESSER PDK-iO0 LOO F/10080-8000 FT. NOTE' WHILE LOOOING ANNULUS FLUID ROSE TO 357. 6. O0 .... Cf'PC, REVERSE DN ANNULUS; UP L.S. X S.S. W/620 BBL P.O.. 5. 00 .... OTHER, SHUT IN FOR PRESS BUILD UPi ]'BO X CSO STABLE TO 550 PSI. !. 50 - OTNEE, BLED PRESS DN X DISP L. 8. X RUN KOBE PUMP 3 X ~--t/8 X ~ ~8. - .-1 ~ S/N 1~Z342. '= 50 '- 0 TM "- ~' ~. ~ ri=n, PUMPINg .... *~* 07/22/86 ~RAN l '~- ,~--' ,:= POINT i874~2 #26, QRANi;E POINT, PARKER-ANNA i50, AMOCO PRODUCTION, FLAC 973019-01-I, AP1 507332029700, AUTH TD 10860° AUTH COST $474000, AMOCO W. I. 50. 0000 OPERA]'IONS' TD 10860 FT, RIGOING' TO CIRC X KILL WELL. COSTS' DAILY WELL $8581, CUM WELL $~1045 CHRON 'TIME DISTRIBUTION (HRS)' "~:.. 50 -- OTHER, CLEAR DECK TO SKID 10. 50 - MI, SKID TO WELL 5. O0 - OTHER, PULL KOBE PUMP; WIRELINE STANDIN~ VALVE; HOOK UP DENV ER REOION ~ ANCHC:RA~ DISTRICT *** 09/08/86 ~-** PAOE SERVICE LI"-'"'NL:::,~ SEI' STAIRS. 07/23/86 *** ,3RANITE POINT 18742 .~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, ¢.--A~.:4.-~.~.~.-.~.-~.~.~ ~I.~ ,~ ~.~ ., . c'l ~r- .-.,~,~r , ~ _~ ~ . ~,, ' . . _ , _~,. '~'..',~o1~-O! , API 507332029700, A}~TH TD 10860, ..vlH COST AMOCO ',~. i. 50. 0000 ..... .m-,~. TD ~0860 FT TEST i:~ OPERA ~ z ~.,,,.o , COSTS: DAZLY WELL $14378, CUM W~LL ~35423 , ~.N,= BOP TEST REMARKS' S'~TE {JOHN L. EVERSON} WA~VERED ~TNESS" i. 50 -.- RSER, R~ SERVICE AND C~RC L~NES 3. 50 - C~RC, W/8. 4 FN S. 50 - RU, ELECTRIC L~NE; CUT SS 2-3/8 ~N. ~T 9655 FT ~0. O0 -" NUBOP 5. 50 ..... TSTBOP~ X HYDR~L. HAD TO REPLACE CLAMP IN R~SER P~PE ->*,,~ 07/24/86 r3RANITE POINT 18742 ~26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, ****,~-*** ******** *****~*****.~.******************** .~*********************** ****.x-*** FLAC 973019-01-1, API .~nv'%qon29700,. ~ AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PU 3-1/2 IN DP COSI'S: DAILY WELL $14251, CUM WELL $49674 REMARKS' TOOK 1. 7 BOLS TO FILL HOLE WHEN STARTED TO RIQ TO PULL S.S. RIO- TO PULL SS AND ¢IRC DOWN HOLE <SS MINOR SCALE} L/D M, OBE BHA W/2 dTS L.S. {LS SLI(~}HT SCALE; TAILPIPE MINOR SCALE. BHA = 8-1/2 IN. BIT; BIT SUB; 5 EA 4-3/4 IN. DCS CHRON TIME DISTRIBUTION (HRS): i. 'i. Or'~ ....P T~., 5. O0 -- CIRC, ~' O0 -.. PTG:: i. O0 - PT~, · ,"-,~"~ .... ~..'-' O0 - PU, PULL SS/LAY DOWN DN SL AND UP ANNULUS {QAS} PULL LS AND STAND BACK PULL. TAILPIPE AND STAND BACK 'BHA 3-1/2 IN. DRILL PIPE · ,4, ~,.~.. 07/25/86 **~- ~RANiTE POINT 18742 ~26, ORANI'TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FL. AC 973019-01-1, AP1 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, TOH W/5-.7/8 IN. BIT COSTS: DAILY WELL $10860, CUM WELL $60584 REMARKS' TIH TO TOP OF LINER AT 7724; NO TIQHT SPOTS W/ 8-1/2 IN] BIT. CHRON TIME DISTRIBUTION (HRS): REg,",_'.:q .*** ANCHORAGE ,. t DISTRICT '~'.~'* 09/08/86 -.,'-** PAQE (" &. 5:.) -. PU, 2. :3C.~ .-- C i RC, '":' nO -- TRIP, .:, Or_: - TRIP, 2. 50 -. CIRC, :3 ~'":~ TR"'-' Z'. 3C"-.- T R I P, t:.:. :'.50 .-- T iR iF', '--i "~ IN. ~ : -~ ~,.~., ILL PIPE BOTTOMS UP OUT X L/D 8-1/2 IN. BIT X SUB IN W/6-1/8 iN. BI]' X 7 IN. CS¢ SCRAPER; TIQHT AT 8254. BOTTOMS UP AT 8252 FT OUT X L/D BI]' X SCRAPER IN W/5-7/'8 :.~'N. BIT. TI(~HT AT SAME SPOT <8254}. TRIED C irc THROUQH - NO ~0. OUT G'RF~N~'i'E P.'D!NT i874;2 ~2&, CJRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, .,.. F'LAC q~73019-01-1, AP1 507332022~700, AUTH TD 108~0, AUTH COST $4.74000, A?IC'C,f] ~,!. I. 50. 0000 OPE:RA'T i .... ,,,....., TD 10860 FT, CIRC X MiX KCL AT 8254 C'r;c'"r~'..,,....... , ... i),z'~ILY WELL $'~ 0938,. CUM WELL $714.72 REP'i,'":'.'~R~.~.S' SWEDQE ASSY = 5-3./!6 IN. TAPER SWEDQE~ 4-3/4 IN. DC,: ,3ARS; · " / . [JUMPER SUB; 8 EA. 4-,3. 4 IN DC CHF:ON 'T.',ZME DISTRIBUTION (HRS>' O. 50 .... 'TRIP, OUT W/5-7/8 IN. BIT .... ,,, OTHER, WAlT ON TOOLS 3. 50 ..... TRIP, IN TO 8254 F'T 'W/4-5/8 IN BIT. TAC~QED UP - TIQHT 8254 2. 50 -- r,..,. IRC, C-~=,,." "' OUT 2. 50 - 'f'RIP, OUT 2. 50 - TRIP, P/U 3 EA. 4..--3/4 IN. DC X 4-7'/8 IN. BlT X TIH TO 8254 oL .,.. ~H TLY i. O0 - OTHER, WASH X RM THRU BAD SPOT AT 8254. DP WAS ,JUMPINg- "'' 'r"', W/15000 LBS BIT WT. THEN FELL THRU TO o,.-.~77 {KELLY DN} .'.:.;: '.'-.'~0 -.. (;iRC, BOTTOMS UP/ SLIGHT SCALE ,.)... r.-,.-..,,.~? _ TRIP,. OUT; LOST 1 CONE i. O0 -- OTFtER P/U SWEDQE A.:.~.m.Y 3. O0 - ]'RIP, IN 'TO 8254; SWEDgE WENT I'HRU W/iSO00 LBS O. 50 -.. C!RC, X MIX KCL {SLIQHT FLOW} C-:RANI'TE POINT 18742 ¢¢26, QRANIT'E POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC ~73019-01-1: AP1 507332029700, AUTH TD 10860, AUTH COST .$474000, ~,..."iC}CC': ~,.~. I. 50. 0000 OF."E'RA"['i!3!',;S: TD 10860 FT, TIH .W/5-7/8 IN. BIT CC]~T,~: DAILY WEI_L $14638, CUM ~ELL $86110 CHROf.4 TiM;E DISTRIBUTION (HRS): 3.00 -- CIRC, 3. O0 -. TRIP, ~. oD -' 'TRIP, ,...,."--' O0 - C IRC, 2. 50 - TRIP, X MIX KCL OUT X L/D 5-3/16 IN. CS~ SWEDQE iN W/5-3/4 IN. CS(~ SWEDQE X WORK THRU TIC:HT SPQT AT 8254 W/20-25000 LBS IN X OUT EXTRA WT. X MIX KCL - 8. 5 PP(~ OUT X L/D 5-3/4 IN. SWED(~E uEI,.\. ,=P .=. ~.'.u.' T R i P, "" :,-, r IRC, ~. 50 - TRIP, ,JO - TRIP, RE~iON *** ANCHORAGE ,, DISTRICT *** 09/08/86 *** PAgE IN W/6-!/8 IN. CSg SWEDQE; WORE THRU TIGHT SPOT F/8249 TO 8263 W/40000 LBS EXTRA WT. X CUT DRLg LINE OUT X L/D 6-i/8 IN. SWEDgE IN W/5-7/8 IN. BIT. WENT THRU TIGHT SPOT AT 8P54. COULD SEE EXTRA 4-.5000 LBS AS BUMPER SUB CLOSED THEN OPENED. [~RANiI'E POINT 18742 ~6, gRANITE POINT, PARI&ER-ANNA 150, AMOCO PRODUCTION, ..~..~...~ ** **** ..~,.~.. *** ~.**** ..~****** ******** **** ******** **** **** ******** ***, ******** ........... Ob,mO, AU'FH ~OST $474nA~] ~; ~:" S;"730i 9-01 .... i, APT 50733Z:029700, AUTH TDt ~" ~ . .~ ,,~,~0~. [. 50. 0000 OPE. r.~t[ONS' TD 10B60 FT, C]RC N/9. 1 PPg SALT WATER COSTS' D~LY WELL $1~546, CUM WELL *98656 REIfi~RKS' SENT CRANE CRE~ TO DIL. LON TO LOAD NACL ON BOAT. NELL STARTED FLON~Ng ~/4 IN. ST~E~; BUILT TO ~ IN. STREAM IN !/~ HR. NOTE: WHEN ~.-7/B ~N. ~!T NENT PA~T ~5~ FT; BU~PER ~UB CLUED; THEN OPENED. AN EXTRA 4000 LB~ W~S OVSERVED ON ~'r ~NDiCATOR. CHRON "F!ME DISTRiBUTiON 3. O0 -. TR~P, P/U D. Pi TAg F~LL AT ~00~4 7. O0 '-. OTHER, NELL FLON[NC~; P/U KELLY X SHUT IN. PRES~ l&O P~I-TVD 7837 9. O0 '- C IRC, X M~X N~CL TO ~. 9 PPg O. 50 .... OTHER, OBSERVE NELL_ 2. O0 - OTHER, SHUT %N NELL_ - ~U[LD P]"FS TO 9. 1 PPQ~ PRESS BUILT TO 50 2. ~0 .... C~RC, X MAiNTaiN e. ~ PP~ [N ~Y~TE~ '..+ *.,'.~' 07/29/86 **.~' gRANiTE POINT 18742 ~26, gRANITE POINT~ PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-i, AP1 50733;~029700, AUTH TD 10860, AUTH COST $474000, AMOCO W. !. 50. 0000 OP~]RAT'In o. TD ~ ,,N,:~. 10860 F'F, REV rIL. L AT 10112 FT COSI'S. DALLY WELL $18375, CUM WELL $117031 RE?~ARF, S: WHILE L. D BIT X P/U D--.!/2 IN. MAGNET- PIN ON BOWEN dARS TOOL dT PARTED. FELL 2-1/2 FT. TO RIg FLOOR. NO ONE HURT. CHRON TIME DISTRIBUTION (HRS): i. DO -. CIRC, X MAINTAIN 9. 1 PPg O. DO ..... OTHER, OBSERVE WELL; TAg FILL AT 1001~; W~SHED AWAY IMMEDIATELY' TO 10014 FT. 3. O0 - TRIP, OUT- L/D BIT <5-7/8 IN} 1. O0 .... OTHER, PIN PARTED ON TOOL dT 2. 50 -. TRIP, 3. 50 -' ClRC, 3. 50 -. TRIP, 4. O0 '- 'FRIP, O. 50 - C IRC, 1. O0 - C IRC, O. 50 - C IRC, IN W/5-1/2 IN. MAGNET - 9990 FT X BRINg WT BACK 9. 1 PPg OUT W/MAgNET; WASH TO 100~7 EASY W/MAgNET. NO CONE RECOVERY L/D 3 DC; ~ dUNK BASKETS; STRAP IN W/CUT OUT 5;-7/8 iN. BIT CLEANOUT 1001 4-10089 REV AT 10045 CLEAN OUT TO 10189 : ......ER RE¢ION **~ ANCl.4ut,~E ,-',-rRIc"' ~** 09/08/86 *** PAGE Di :.:. , "'. 5('3 - L.!RC, REV AT i0!-~:~ {PIT X F'LOW LINE PLU,.-,G.~N¢] -" REV AT lOti2. *** 07/30/86 *** ~}RAN!'FE POINT 18742 ~26: gRANiTE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, =, ,.~' :-;- ..... ~o1¢-01.--.1 AP1 507332029700, AUTH TD 10860, AUTH COST $474000, u.~Ou OPERAT:rONS' 'TO t08SO ET, TOH COSTS: DAZLY WELL $12530, CUM WELL $129561 CI-~Rn''~, ... ....,~., t '~ ~'i~.: ~.~, r~IB !ON (HRS)' 0 50 -' C ~RC, 5. 50 ..... C I 6. 50 - C fRC, 3. O0 '- TRIP, '3. ,50 - TRIP, '"'~ ."',0-- ¢- ! RC ~ '"' ,'"'0 ..... TRIP, - . ,r.%., ~.,: REV CIRC AT '10112 REV C IRC X CLEAN 10112 TO 10294 t40LE CLEAN X ~IRC BUILD WT TO 9 3 DUE TO WELL. FLOWING OUTJ LAY BIT DOWN iN X P/U BRIDGE PLU¢~ AND TIH; SET PLUG AT 8370 BUILD WT TO 9. 4; WELL FLOWINO~ OUT W/BP SET TOOL .~. **. 07/31/86 *** GRAN'~:"FE POINT 1874.2 ¢26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F'L.../'.,..C; 9730 ~ 9-01-1, API 507332029700, AUTH TD 10860, AUTH COST ~474000, ¢~M~,t,O W. i 50 0000 OPERmTI' '0,~=~' TD ~0860 ET, LAY DN ~-1/2 IN. TB(¢ COS~°-,,,. DAILY WELL $15401~ CUM WELL $144962 REMARKS' TRIED TO S~UEEZE BAD CASIN~ AND PERES 8216-8296~ 8307-8340 PUMP !0 I3BL. S CEMENT; A'TTEMPTED TO S~UEEZE 5 BBL5; TOP PRESS 450. CEMENT IN PLACE AT 6' 40 PM X END SOUEEZE AT 8' 20 Pld. ALSO BAD CASIN~ 8254. FINAL SG PRESSURE 350 PSI. CHRON T):?!E DISTRi~UTiON (HRS)' .. i,,J -" TRiP OUT X L./D BAI~.ER BP TOOLS i. C,O -' PU, 9 .JTS DF 3-'L/2 IN. TUBINQ '2... =r.,.~,.,, ..-. TmlF', ,, , IN N/R~TS TOOL X SET AT 7784 ~. 50 .... OTHER, PNP DN DP THRU PKR TO ~500 PSI~ NO FLOW ~N ANNULUS. PRESSURE. UP BACKSIDE ANNULUS 2000 PSIi HELD OK. TA~ B PLU~ A'T 8370 - PULL TAIL. PIPE TO 8345. 4. O0 - CIRC, ~U~LD MT T8 9. 6 4. 50 -- S(~, X CHT CS~ X PERES 3. ='3.,.,. ...... WOC, HOLD PRESS QN CNT S~UEEZE ..... , ,DU,_, PRESS ON DP ~bO PST NHEN STARTED OUT HOLE ~. 50 'TRIP, OliT N/RZTS ~-' ' "' 2. O0 - TRIP, IN N/TUBIN~ -" 79 JT9 ~ O0 - TRIP OUT X L/D 79 JTS CQMPL, RECQMPL, REPAIR QPERATIONS: 07/3~/8~, TYPE-S~UEEZE, : TOP DEPTH 82~ ET, BQTTQ~ 8340 FT S(2UEEZE TREATMENT: STA~E I, BATCH ~, CEMENT, API CLASS ~, - ~0, BBLS, PKR DEPTH 8370 ET, SLURRY DENSITY ~5. 6 PP~, AV~ DISP RATE 3 BPM, .. DENVER · . REGION -~-.~.~ ANCHORAGE DISTRICT ~'~ 09/08/86 .~ PA~E ¢' J~u.E-,'.u. ~:,.DD iTIVES PR~.~.~UI,E ?.40 PSI S~UEEZED 5. O0 BBLS, FINAL , ,- ...... ri, _ TYP E--RET ARDER, LWL, O. 20, "; TYPE--FILTRATION OR WATER LOSS CONTROL, HALAD 344, O. 60, % TYPE-OTi4ER: ¢,,...L, O..-:,~), % .'"¢f~.ANI'f'E PC'I.!!'4T 18'74..2 ' ~ ~*,--....,, CJRANI'T'[-- PO!N'f', PARKER-ANNA 150, AMOCO PRC'..DUCT[ON, FLAC '973019-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000, - AMOCO W.I. 50.0000 DPER' '~ - .-..,.t iONS: TD .,.0860 FT, WOC COS. T~-" D,.",,llLY ' -"' " ._ ..... W~,._,._ $~.5185, rUM k!ELL $160147 REMARKS' TA~ ~P AT 8370. FORMA'TION WOULD NOT HOLD PRESS. t500 BLEED OFF 2/B~qLS WATER.-24 CEMENT - ~. 5 WATER-53. 5 KILL WATER TO DISPL CENENT CHRON TiME D'rs"f'RIBUTION =. O0 - TRIP, OUT X L/D ~-'~/2 IN. TB~ 3. 50 - TRIP, IN X TAG CEMENT AT 8254 O. 50 -.. OTHER, TEST CEMENT !000 PSI ON A. NNULUS,~ BLEED 100 PSi PER/MIN !. O0 - OTI4ER, BUILD 50 Bf2LS TO 9.6 1. 50 -. DRLCMT, TAG CMT 8253~ DRILL TO 8368. FIRM CEMENT 3. O0 - CIRC, CEMENT OUT O. 50 - OTHER, TEST CMT. PUT I0000 ON ANNULUS. BLEED 250' PSI' PER/M!N ,.=.'"'~' 50 -. TRIP, OUT ,"' ~%) .... TRIP IN P/U 12 ,J'T'S '~- A.j[IL. R/'U TO MzX X PMP ..,... , ,..., 1/2 !t'4 BUTT X [;i'l'TS ''"'" " CMT 5. O0 - SO, 7-1/4. B,.9,°LS CMT W/ STOP P !N(.} PRESSURE OF 2000 PSI. STAGE CMT IN PERFORATIONS' 08/01/86, TOP 764-5 FT, BOTTOI4 8370 FT, TYPE-CLOSED COMPL., RECOMF'L, REPAIR OPERATIONS; 08/'0!/86, T'YPE-SO]UEEZE, TOP DEPTH 7645 FT, BOT'.rOM 8370 F'T SC~.UEEZE TREATMENT: STAQE 2, E.~A°f'CH 2, CEMENT, APl CLASS 24, BilLS, PliR DEPTH 8370 FT, SLURRY DENSITY 15. 6 PP~, AV~ DISP RA'T'E 2 BPM.;' AVQ DISP PRES 200 PSI, SQUEEZED 5. O0 BBLS, FINAL PRESSURE 2000 PSI S~UEEZE ADDITIVES: TYPE-RETARDER, LWL, O. 20, % TYPE-FILTRATION OR WATER' LOSS CONTROL, HALAD 344, O. 60, TYPE -OTHER, KCL, O. 30, % REGION ~**. ANCHORAGE DISTRICT *~* 09/'08/86 **.4 P,AQE 8 RO=UCT .~R.~N£.._ r. OINT -.8742 #26, gRANITE POINT, PARKER-ANNA 150, AMOCO P .... ION, FLAC 973019-01-I, API 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATI '~ ' · ., ~,NS TD 10860 FT DR ILL CEldENT ~"~'~'~,....:. DAIL. Y MUD s10461, CUM MUD $10461, DAI~.~' ' WELL $25836, CUM WELL ~185983 r~-~rit ....TrtiE [,iSTRT~,~ION (HRS)' . elf, ..- ~,0~, ~CHANQE PUMP ON WELL ~35} i 50 - C'iRC, SHUT-IN D. P..; PRESS STAR]' 1390 END 1220 PSI; RELEASE RTTS - FLOWINQ. REV CIRC. 6 BBLS CONTAMINATED FLUID B]"~S UP 4 O0 -.- TR~'~ .,F, OUT X L/D RT'TS 3 50 - OTHER, P/U X STANDBACF, 78 ,)TS 3-t/2 IN. ]'BQ TAILPIPE ,.,'? O0 ...... -- TRIP, IN 1.4/5-7/8 ~IT TAQ~ED CMT AT 7850 SUPPORT ~0000 L~..,.~- BIT WT 2. C.O - CIRC, BT~S UP O. 50 -- OTHER, PRESS TST CSQ AT 7850; STAR]' 1950 PSI - END 1715 PSI :;2. 50 -- DRLCMT, F/7850-80'75 FT. FIRM - NO STRINQERS · ~** 08/03/86 *** ~.}RAI,4i'TE POINT 18742 $$26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F'LAC 973019-01-i, AP1 507332029700, AUTH TD 10860, AUTH COST $474000¢ AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, ClRC W/F. I. W.-DISPL 9. 6 FL C'"'~'"""S: CUM MUD $10461, DAILY WELL $27838, CUM WELL $213~¢:1 CHRON TiME DISTRIBUTION (HRS): O. 50 - DRLCMT, F/8075-8135. QOOD CMT i. 50 - CIRC, HOLE CLEAN O. 50 - OTHER, L/D PIPE. REPLACE F/DERRICK 2. f}O - DRLCMT, F'/8135--8300 2. O0 - CiRC, BTMS UP CLEAN 1..O0 .... OTHER, PRESS TST PERF 1950 PSI. LOST 350 PSI IN 6 MIN. LOST aO0 PSI IN 24 MIN l. 50 - DRLCIdT, F/8300-8336. WASH 8370 2. 50 -. CIRC, BTMS UP CLEAN O. 50 -- OTHER, PRESS TST PERF 2000 PSI. LOST 500 PS! iN 9 MIN. LOST 190 PSI IN 21 MIN 3. O0 - TRIP, OUT X L/D BIT i. O0 - TRIP, IN 7 STANDS 3-1/2 IN. TB~ X L/D i. O0 - RSER, SLIP X CUT DRL~ LINE 2. 50 -- TRIP, IN W/5-7/8 IN. BIT TO 8370 O. 50 - OTHER, CLEAN SUCTION PIT 3. 50 - C.IRC, REV 9. 6 PPg FLUID W/F. I. W *** 08/04/86 *** C.'-RANITE POINT 18742 #26, QRANITE POINT, PARKER-ANNA 150, AMOCO PR8DUCTION, FLAC 973019=01-1, API 507332029700~ AUTH TD 10860~ AUTH COST $474000,' AMOCO W.I. 50. 0000 DEN'¢PR REGION *** ANCHORAGE DISTRICT *** 09/08/86 *** PAGE OP[~T[u,,:S. TD ~G~Gu FT, TF~H W/6 ZN. BZ'T J ' ~ ~. EO - ~TN[R, DB!EE UP BR~[ PLU~ B~70 FT !. O0 - TR '-' no C iRC, --, ~r, TRIP, ,,~. ,.., ~ --- :2. 5C> - TR!P, ~. 50 -.- TRIP, 2. 50 -- 'FRiP, O. 50 --. CIRC, 2. 00 ..- C IRC, ~.". 00. - T R ..'~ P, 1. O0 - C IRC, 1. 50 - CIR(:, !, 50 '- TRIP, IN SLOW TO !0294 - OK C LEAN OUT X L/D 5-7/8 IN. BIT X -JUNKSUB IN W/6-1/8 IN. BIT TO 82:4. BIT TOO TIGHT AT 8254 OUT X L/D 6--I/8 X P/U 6 iN. BIT IN TO 9370. 6 iN. BIT SLIPPED THRU SPOT W/15000 LBS FIRST TIME; 5000 LBS THEREAFTER X ROTATE ~o~ , .-~ · J; 0-94o9 B'!-MS UP. '-'" "' "' · ,,mo BUBBLE CIRC UP AFTER ROTATiNO~ TH,S SECTION OUT 7 STD..q,.., ,,," L/D o, JTS DP X ROTATE 8464-8780 B TMS UP OUT W/6 'IN. BIT *.~'-~' 08/05/86 *** gRANITE POINT 18742 ~26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-I, APl 507332029'700, AUTH TD 10860, AU'TH COST $474000~ A~n~.n W. i 50 0000 i~ ,...~ ~'..., ~'... . . OPER.ATIONS: TD 10860 FT, TOH L/D DRILL PIPE COSTS: CUM MUD $10461, DAILY' WELL $11633, CUM WELL $249688 REMARES' NOTE: BEFORE .FIRING GUNS HOLE DRINKIN~ 4 BB'LS PER/HR CHRON TIME DISTRIBUTION (HRS)' 2. O0 -. TRIP, OUT L/D BIT 6.. 50 -- TRIP, iN W/PACKER TO Ti~H'T SPOT AT 8254. DID NOT ~0 I'HRU. POH. LAY DN PACKER 8. 50 .- ']'RIP, IN P/U 260 FT 'T'BG CONVEYED ~UNS; 15 STDS 3. 5 11'4. TBG~ PKR; DP; RABBITT T'BG X DP. FILl. 15 STDS TBO~ X 62 STDS W/WATER 2. 50 -- RU, RIG UP DRESSER ATLAS X CORRELATE DEPTH FOR PERF CUNS ! 50 - OTHER, FIRE gUNS. APPEARED TO FIRE OK. CK FOR BLOW FOR I HR -NO BLOW. NC] RETURNS. NO PRESSURE. 17 BBL. S TO FILL HOLE W/PULLED PACKER LOOSE 1. 50 - CIRC, REVERSE HOLE 1. 50 - TRIP, OUT X L/D DP PERFORATIONS' 08/05/86~ TOP 9495 FT, BOTTOM 9530 FT, I'YPE-OPEN~ SHOTS/FT. 4, PERF DIAM. O. 520 IN, TOTAL NO. SHOT 140, GUN-OTHER, SIZE 4. 000 IN, PHASINg 90 F'LUID WATER, DENSITY 8.4 PP~, LEVEL 2300 FT 08/05/86, TOP 9625 FT~ BOTTOM 9755 FT, TYPE-OPEN, SHOTS/FT. 4, PERF' DIAM. O. 520 IN, TOTAL NO. SHOT 423, GUN-OTHER, SIZE 4. 000 IN, PHASIN~ 90 DEQ, FLUID WATER, DENSITY 8. 4 PPg, LEVEL 2300 FT 08/06/86 · . . DENVER REO~ION ~.~-.~ ANCHORAC..E DISTRICT ~?~* 09/08;'86 ~.~ PAGE 10 ,, gRAr.IiTE PO'~NT 18742 ~26, CRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F:LAC 973019-01-1, API 507332029700, AUTH TD 10860, AUTH COST $474000, · ~,~, ~. i. 50. 0000 OPERATIONS: TD 10860 FT, P. U 3-1/2 IN. TBQ COSTS: CUM MUD $10461 DAILY WELL $43702, CUM WELL REMAFZH, S' RETAINER PLATE ~OL.'T CAME OUT IN SHAET ON COMPOUND. BOLT RUBBED NEXT PLATE AND BEARINQ. REPLACED. LOADED BOAT WITH DP AND OTHER ITEMS WHILE WORKINg ON Rig. CHRON ]'l~!E DISTRIBUTION (HRS)' !I. O0 -. TRIP, OUT X L/D 3--1/2 IN. DP i. 50 -. PU, PU 'TUB lNG' X RIH iO. 50 - i O0- PU, 'FBg X RZH gRr]N!TE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC.. 9730!9-01-!, APl 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, RIH W/DUAL 3-1/2 COSTS~ CUM MUD $10461, DAILY WELL $48579, CUM WELL $341.969 REMARKS: HOLE HAS TAKEN A TOTAL OF 493 BBLS OF FLUID SINCE DRILLIN~ ~ PL.U~ AS OF 6 Aid. <LAST 24 HRS 6 BPH CHRON TIME DISTRIBUTION (HRS): 7. O0 - TRIP, 2. 50 -- TRIP, i O0 - TR !P, 2. 50 - RU, ii. (.)0 - RTC~, IN P/Li 3-1/2 IN. TB.~ OUT X STAND 3--1/2 IN. TBG IN DERRICK IN W/TAIL. PIPE KOBE 3 IN. CAVITY S/N L-285; DUAL_ SLIPS X EI_EVA]'ORS,' HYDROTEST R IH W/DUAL 3--1./2 TBS; BROACH LS. HYDROTEST TO 3900 PSI -~,'"~'~ 08/08/86 ~- .~- ,:.hAl,~iE.~:~OIN'F 18742 ~¢26, gRANI'I'E POINT, PARKER--ANNA 150, ,-~l'""'""lu,.,O PRODUCT..ON,"F FL. AC 973019-01-I, API 507332029'700, AUTH TD 10860, AUTH COST $474000, APiOCO W.I. 50. 0000 OPERATIONS' TD 10860 FT, SKID RI~ FM LE~ COSTS: CUM MUD $10461, DAILY WELL $26937, CUM WELL $368906 :.,',~-~:'t~,~ DROP S'TANDINO, VALVE. CLEAN RZ~; SHAKER PI'TS × MUD PITS. TEST STANDIN~ VALVE TO 3500 PSI -OK. DROP ~,OBE dET PUMP. CHAN~E OIL. IN #2 X #3 Rig ENQINES. PUMP ON BTM Al' 2220. WINTERIZE MUD PUMP~ RIGi MUD LINES X KELLY. RIG DOWN SERVICE LINES. RAN 2-1/2 JET PUMP W/iOA NOZZLE X THROAT. Rig RELEASED 1200 HRS 8/8/86 CHRO,. ]':[ME DISTRIBUTION (HRS) 2. 50 - RTg, DUAL 3-i/2 IN. BUTT. HYDROTES'¥ BOTH STRINGS 4000 PSI.. BROACH L. S - LAND DENVER .mEOION, *** ANCHORAQE DISTRI"T.~ *** 09z08/86. . *** PAQE 11 .. ~..'~.' U ..... R i~ DN WORKOVER TOOLS 5. 50 - NDBOP, REINSTALL 5 iN RA~S 3. O0 '-- NU, TREE; TEST 5000 PSI. PULL. BPV &. '50 - OTHER, DROP VALVES AND PUMP 6. O0 - OTHER, PMP ~/N~TL del' PU~P. SKID RI~ TO CENTER BETWEEN LEgS ~ X 2 C-'R.~-~N;:TE. F'OrN-r. 18742 '~':'.,,-,.,, gRANITr:._ POTNT,. PARKER-ANNA 150, AMOCO PRODUCT'rON, FL,.~r": 7730.t9--0!-~, AP1 507332029700, AUTH 'rD 1.08&0, AUTH COST $474000, ":,,,"b";,"" ;"] .~ .., . '~ ""; ,.~., :, ......... )..-,;. ~. ~.'-' L.:",~;-,O OPEF:'A'T' ~i i')i'~S' ........... i'D iO~:w'-,O Fl' RE~ ," ,- , ._. ,= u"'; "~ :'.r.-n R I Q ,-',"',OTC'-. ~'].~M MUD $10~'lA1, DA~LY ,.,r:'., ~ $556'7 CUM WELL $374473 - ~..,..,,..._, . ~.~ ......... *'4 I._ I..k. , J REPt~RF.,~' ~4 HR TEST' 2~ ]30PD.; &l~ BWPD~ NO MCFD X OOR~ 20,59 IgPOPD AT 31.&~ PSI. FLUID LEVEL_ ~&~l PT FROM SURFACE. ,..,~ I '1"' CHP.!]"! Ti'ME D'i'S]"RIG,J~ !ON .,HRS)' 6.. O0 - MO, MOVE MUD PUMPS X PUMP HOUSE. SKID RiO- BETWEEN LEQS i X 2. CLEAN TOP DECK X LE~ ROOM IE'~. OC.' -' OTHER, PUMPIN¢ - TEST'!N~ -.~.~...~.~. 08/10/86 ,~.~--~- gRANI]"E POINT 18742_ #26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 9730t9-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPEF~A.'I'I ~m"J'~..., ,,_ TD I ~o~.~,..,,..,o~, FT, PUMP I:N~ C'''~''~'ci '' CUM REMARKS: 2% HR TEST: i7 BOPD~ 5~4 BNPD~ NO HCFD X QOR~ 2059 BPQPD A'T' 3~'79 PSi. FLUID 'L_EVEL 5~42 FT FROM SURFACE. CHRON Ti'ME DISTRIBgTION (HRS): 2.4. O0 -. O'I'HER, PUMP I N(; -. TES'TIN(~ QRANtTE POINT 18742 ¢26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-I, APl 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W. i 50 OPE,r'?.ATIONS: TD 10860 FT, PUMP!N~ COSTS' CUM MUD $10461, CUM WELL $374473 REMARKS: 24 HR TEST: 11 BOPD; 561 BWPDi 0 MCFD X QOR; 2091 BPOPD AT 3249 PSI. FLUID LEVEL 5736 FT FROM SURFACE. CHRON TIME DISTRIBUTION (HRS): 24. O0 -' OTHER, PUMPINg - TESTINQ . ~,~ 08/12t86 ... DE:.'.&:E~.? RE£-'! ON -~-~...x- ANCHORAO_,E DISTRICT ~..~. 09/08/86 ~,.~.~ PAgE (~RANfTE POINT 1874;) ~26, QRANITE POINl', PARKER-ANNA !50, AMOCO PRODUCTION, FLAC 973019-01-I, API 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINQ COSTS: CUM MUD $10461, CUM WELL $374473 REMARF, S: 24 HR AVG TEST: 174 BCIPD; 627 BWPD; 23 MCFD; QOR 159; BPOPD 1386 AT 3350 PSI. SPM 64~ FLUID LEVEL 7085 FT FROM SURFACE CHRON TIME DISTRIBUTION (HRS): 3. O0 - OTNER, DOWN FOR PUMP CHANQE 2'L. O0 - OTHER, PU~PIN~ - TESTINQ 08/13/86 ~.~ O, RAN'!T~'-' POINT .1874.-'? ~2-6, O~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, r..::'LAC 973019-0i-1, APl 507332-02-9700, AUTH TD I0860~ AUTH COST $474000, '*' "~"'~"'f'" W. . ~",,~J", .... ,' I. ~0 0000 OPERATIONS' TD 10860 FT, PUMPIN~ · .F."' -r' ~'" CO::~,:,: CUId MUD $10461, CUM WEL. L $374473 REMARKS'~4 HR AVO, TEST' 112_ BOPD~ &88 BWPD; 48 MCFD; QOR 413; BPOPD 14-61 AT 3402- PSI; SPM 50; FLUID LEVEL 7053 FT FROM SURFACE. CHRON TIME DISTRIBUTION (HRS)' ,:~ ..... ~:..; -" OTHER, PUMPINg - TESTINQ gRAN.'(.TE POINT 18742 ~26, ~RANI'TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FL. AC 973019-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINO~ COSTS: CUM MUD $10461, CUM WELL $374473 REMAR. F,S: 24 HR AVO~ TEST: !65 BOPD; 662 BWPD~ 66 MCFD; (;OR 400~ BPOPD 2569 Al- 3397 PSI; SPM 63; FLUID LEVEL 6847 FT FROM SURFACE. CHRON TIME DISTRIBUTION (HRS): 24.00 -.. OTHER, PUMPIN<D - TESTIN(~ O. RANiTE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F'LAC 973019-01-1, API 507332029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.i. 50. 0000 OPERATIONS' TD 10860 FT, PUMPINg . .... ,.,-,. ...UM MUD $10461, CUM WELL $374473 REMARKS:24 HR AVQ TEST: 191 BOPD; 718 BWPD; 84 MCFD; QOR.449; BPOPD 1615 AT 3402 PSI; SPM 63; FLUID LEVEL 6657 FT FROM SURFACE. DENVER · . REQ!ON ~ ANCHORAGE DISTRICT ~ 09/08/86 .~.~ PAP~E 24 HR Avg TEST- 191 BOF'D~ 718 BWPD~ 84 MCFD~ gOR 449; BPOPD 16~5 AT 3402 PSI; SPM 63; FLUID LEVEL 6657 FT FROM SURFACE. CHRON TIME DISTRIBUTION (HR-S): 24. O0 - OTHER, PUMPINC - TESTINC 24.00 - OTHER, PUMPINg- TESTINg 13 ~-'.~+~,'.'... 08/16/86 -.~.~ gRAN£TE POINT i874'-? t~26, O~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-1, AP1 50'733~029700, AUTH TD 10860, AUTH COST $474000, P,~OdO W.l. 50. 0000 (]PER. A]'!Oi'~S: TD 10860 FT, PUMPINg COSTS: CUM MUD $10461, CUM WELL $374473 - REMARKS: ~4 HR AVQ TEST: 790 MCFDi QOR 55~; 8F 848 AT 77 PER CENT BS X Wi ~]'Y 40. 8; MCF I06~ CHRON TIME DISTRIBUTION ~.4. (}0 - OTHER, PUlqPINg - TESTINg · .~.-~ 08/17/86 .~--~ GRANITE POINT 1874;_~ t~26, GRANITE POINT, PARKER-ANNA 150~ AMOCO PRODUCTION, F'LAC 973019-01-1, AP1 507332029'700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINg COSTS: CUM MUD $10461, CUM WELt_ $374473 RE,~AR~;,S: 2_4 HR, AVQ TEST: BF 803; QTY 41. 0 AT 60~ BS X W 75 PER CENT MCF 114; QO~ 590; BPOPD 1685 AT 3368 PSIi SPM 64; FL 6657 ENQ E~F 83 PER CENT; PUMP EFF 58 PE[4 CENTi CHRON TIME DISTRIBUTION (HRS): 2).4. O0 - OTHER, PUMF'INg - ]'ESTINQ .;+-~t.-~.,.. 08/18/86 GRANITE POINT 18742 ~26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC ~'73019-01-1, AP1 507332029'700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPING ) COSTS: CUM MUD $!0461, CUM WELL $374473 REMARK~S: 24 HR AVQ TEST: BF 809; BS X W 73 PER CENT; MCF 124; QOR 579; BPOPD 1676 AT 3368 PSI; SPM 64~ FL 6655 CHRON TIME DISTRIBUTION (HRS): 2.4. O0 '- OTHER, PUMPING - TESTINg -~ ~.~ 08/19/86 DISTRICT .~'."'~. 09/08/86 ~..~-~ PAgE 1 4 gRAs,J['r~:: F.'C'.,N'~ .-8~4~ ~---6, gRANITE POINT: PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-1, API 5073320~9700, AUTH TD 10860, AUTH COST $474000, .AP1CDCO W.I. 50. · --.r~AFIONS TD 10860 FT, PUMPINg COS]'FS' CUM ,~UD $10461, CUM WELL $374473 RE?..AR!<,S-.24 HR AVQ TEST' gF 8!6; BS X W 70 PER CENT; WATER RECT · ']~OR 4'75; BPOPD 1.583 .AT 3400 PSI~ SPM 64~ FL 656! CHF~ n..,,.~ 'F "K~E D ~ '~'"'-' ! HR ~; - .... ,_u, .~ BUT iON ( ..,j. '_'; ~L O0 -.- 0 THER, p~ ~.',p T ' ' · ,-o T -- · ,.:.- _Nt; -- 1-~:.:~ C~RAI',ilTE F'OINT 1874~ :~6, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, - F't_.AC V-730~9-01-!, API 507332029'7"00, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OP~=RA'Ti'-'I'~'~'',., ,~. TD 10860 FT, PUMP~N~ ~:~'~'''''' CUM MUD $10461, CUM WELL $374473 ,:~,~-:.~.,~, 24 HR AV~ TEST' BF 835J AT 60 PER CEN'T WATER RECT 127; ~OR 498~ BPOPD i69! AT 3410 PSI; SP~ &6; FL ~5~2 HR m, C,4 T'rME DISTRIBUTION · 24.00 -. OTHER, PUMPIN~ - TESTINg · ~' '~"~,~' 08/21/86 ~'RANJi'FE POINT 18742 ~¢26, (~RAN!TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F"L.~'&C 973019-0t-!, APl 507332]02.9700, AUTH TD 10860, AUTH COST $474000, Al'lC)CO W.I. 50. 0000 OPERATIONS: TD ~0860 FT, PUMPIN~ COc~TS'', ~.. .. CUM MUD $10461, r'UM~ WELL.. $374473 REMARKS: 24 HR AVQ TEST; BF 843~ AT 60 PER CENT WATER NET OIL - NET !39; QOR 509; SP'M 64; FL 6530 CHF:ON TihIE DiSTRiBUTION (HRS): '-~'" C,¢~- OTHER, PUMPINg TESTINg -:~'~'-~: 08/22/86 ~.~-* gRANITE F'O!NT 18742 ~26, gRANITE POINT, PARKER-.ANNA I50, AMOCO PRODUCTION, FLAC 973019-01-1, AP1 50733.2029700, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINg COSTS: CUM MUD $10461, CUM WELL $374473 REMARKS: 24 HR AVC- TEST: BF 840; AT 60 PER CENT WATER; o - MCF 145; QOR 521; SPM 65; FL 6530; BYOPD 1701 A'I' 3378 24 HR AVQ TEST: BOPD 286; BWPD 554; MCFD 145; QOR 507; 8POPD 1701 AT 3378 PSI; SPM 65; FLUID LEVEL &530 FT FROM SURFACE DENVER REGION **._* ANCHORAGE CHRON TiME DISTRIBUTION (HRS): 24. O0 - OTHER, PUMPINg - TESTINg 2.4. 00 - OTHER, PUMPIN~ - TESTIN~ DISTRICT **'* 09/08/86 *** PAGE i5 · ~.:- ~ -~ 08123/86 -~** C4RF~?.;!'T~/{ POINT 18742 ~8, GRANITE POINT, PARKER-ANNA i50, AMOCO PRODUCTION, FLAC 973019-01-i, API 5073320~9700, AUTH TD 10860, AUTH COST ~474000, AIiOC0 W. I. 50. OO00 .. ~r,:,~, Ib.~:. TD 10860 FT, PUMPING " ...... ~'TS~ CUM MUD $10461 CUM WE~.~. $3~4473 RE?~AR~/,S' ~4 H~ AVQ TEST- BO~D 2~5~ BWPD 5~9; MCFO 146; ~OE 530~ ~PO~D 1677 AT 33~ ~I; FT F~OM ~URFACE CHRON TIME OlSTRIBUTION 2.4 ~"~ . w,~ - OTHER, PUMPINg - TESI'IN~ 08/24/86 gRANITE POINT 18742 ~26, gRANITE POINT, PARKER-ANNA 150~ AMOCO PRODUCTION, FLAC 973019-01-1, AP1 507332029700, AUTH TD 108,50, AUI'H COST $474000, A~OCC) W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINC-' COSTS: CUM MUD $10461, CUM WELL $374473 REMARKS: 24 HR AVQ TEST: BOPD 296; BWPD 549; MC.F'D t46~ QOR 493; BPOPD 1733 AT 3411 PSI~ SPM 67.; GRAVITY 41. 3 AT 60 DEG; FLUID LEVEL 6498 FT FROM SURFACE CHRON t'tME DISTRIBUTION (FIRS>: 24.00 - OTHER., PUMPINf~ - 'TESTINg C~RANI'f'E PGINT 1874,o #26, GRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION~ FLAC 973019-01-I, API 507332029700~ AU'¥H TD 10860, AUTH COST $474000, AMOCO W. I. 50. 0000 O~ E~AT~.ONS' TD 10860 FT, PUMPING COS'"~' ' ' ~ CUM MUD $10461, CUM WELL. $374473 REMARW, S' D4 HR AVG TEST' BOPD 278; BWPD 564~ MCFD 141; QOR 509; BPOPD 1719 AT 3397 PSI; SPM 66~ GRAVITY 41. 8 AT 60 DEG; FLUID LEVEL 6467 FT FROM SURFACE CHRON I'IME DISTRIBUTION (HRS)' ~4. O0 - OTHER, PUMPING - TESTING ~m~.* 08/26/86 *** nP-NL:Ef::. REGION *** ~,..,:~,...,,.-:.~..-,,..-. n'rSTR'i'C''r ~*.~. 09/08/86 *~.~. PAC~E ' ~R.aN'.".?E.,.- .,.., ... ,,,'"' "-' "": ' T. 18742 ~26, ORANIT~:,.. POINT., PARKER-ANNA 150, AMOCO PRODUCTiC'N, '-' .... . , ~3~0.---9,,00, AUTH TD 10860, AUTH COST $474000, :-{...,-,,_ '-";.'73019-01-1 APl 50'7'-" "'"' ,'"" -"' A~,,'-::'"n W. I 50 0000 O~-F~'A'~'I~'''~''~', _.. . ,,~,,.~ TO. 10860 FT, PUMPiN~ ¢,nc;Tc:. ~" ' MUD ' ' ......... , ,~.,_..,M $i046I, CUM NE,._; $374473 .... '"".':"h .~ ' ,...,,=4..: MCF'D 151.; gOR 506.; BPOPD ;.,~,~¢4,~,:..;' 24 HR AVC-' TEST BOPD 300; B~PD ='"' ~'722 AT 2385 PSZ' '"'"" '~.:-TY FL{...,.' . , ~:~,.A,. ~ 41. 3 AT 60 DE¢~ ID LEVEL. 6403 FT FROM SURFACE; SPM 66 ..'-' :--,~-? c', N~. ,,, T!.M~. _ .~n ISTR ~ BUT ION.- (HRS) · _'::'4.. O0 - OTHER, PUMPINO- - T~.-c'-, ~_,:~ ] INO-. ~}RANI"TE POINT 1874-'?-- ~26., gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-1, AP1 507332029700, AUTH TD 10860, AUTH COST $474000, ,"'~ffiOCO W. ~. 50. 0000 OPERATIONS: TD 10860 FT, PUMPINg COS'rS: CUM MUD $10461, CUM WEL. L $374473 Ci4RON TIME DISTRIBUTION (HRS): 24 O0 -OTHER, PUMPINg- NO QUA(~E ~.-~ 08/2_28/86 .~.~ O~RANITE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, Fi_AC 973019-01-1, AP1 507332?.02-29700, AU]'H TD 10860, AUTH COST $47'4000, .A!"~OC.Q W.I. 50. 0000 OPERATIONS' TD 10860 FT, PUMPIN(~ COSTS: CUM MUD $10461, CUM WELL $374473 REMARKS: 24 HR AVQ TEST: 308 BOPD; 548 BWPD~ gRAVITY 41. I~ MCF 152.~ (~OR 494; BPOPD 1719 AT 3362 PSI; SPM 66; FLUID LEVEL 6470 FT FROM SURFACE. C~-~.Ri3p,i ]"].ME DISTRIBUTION (HRS): 24.00 - OTHER, PUMPINQ - TESTINg 4.'.*-~- 08/29/86 *** O~RANi'TE POINT 18742 #26, QRANITE POINT, PARKER--ANNA 150, AMOCO PRODUCTION, F'LAC 973019-01-1, AP1 507332029-/00, AUTH TD 10860, AUTH COST $474000, AMOCO W.I. 50. 0000 OPERATIONS: TD 10860 FTo PUMPIN(~ COSTS' C'UM MUD $10461, CUM WELL $374473 REMARKS: 24 HR AVO~ TEST: 326 BOPD; 532 BWPD; QRAVITY 41. t; MCF 160; O~OR 491; BPOPD 1710 AT 3346 PSI; SPM 66; FLUID LEVEL 6343 F-T FR OM SURFACE. CHRON TIME DISTRIBUTION (HRS)~ DENVER P EC4i ON **'* ( '"" 0{.'.. -. OTHER PUMP i N¢~ - '""='-' o,:... ~: , i u..: T' lng DISTRICT *,~* 09/08/86 **-~' PAgE .. ( !7 *.~ 08/30!@& ***' .... "',.... ,.,._..4; 18742 ~.26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, :.,R,-,;..~ fT~' p"'"."~' '"' F!._AC '-.-' ;b;Ul"'-~-,..,'-'l-i, APi .... ,.,,¢-'""/,.,o,:.:,,,'"'~2'-.~700, AUTH TD i0860, AdTH COST s474000, :-,.: ,~...,,:.~ ~,4. 'r 50. 0000 O{..-"E'RAT.~3..'4S: TD i0860 FT, PUMPi~'4¢2, COSTS: C',...M MUD $10461, CUM WELL. $3744'73 ~r::: ...... ; .._.....-_ ,.. ,..=TRfB,...TION ( S) ~" &=. m .... (;,",' -. OTHER : PUMPTNO,- ..- ~4C'. ~d.,-,C-E -'.<- -.'~.-.'~ 08/31/86 ~R,~NITE Pf]!.NT 18'742 #26, QRANITE POINT, PARKER--ANNA 150, AMOCO PRODUCTION, FLAC :'{.'7301e-Ol-i, APl 507332029700° AUTH TD 10860, AUTH COST $474000, A~iOCO W.I. 50. 0000 OPERATIOi'JS: TD 10860 FT, PUMPI'N(~ COSTS' CUM MUD $10461, CUM WELL $374473 REMARKS'. 24 HR AVQ TEST: 331 B(DPD~ 541 BWPD; O~RAVITY 41. 1; MCF 163; ~30R 492; BPOPD 1793 AT 3404 PSI; SPM 68; FLUID LEVEL 6343 FT FROM SURFACE. CHR[..IN TiME DISTRIBUTION (HRS): 24. O0 -' OTHER, PUMPINQ - TES'flNQ ¢~RAN[TE POINT 18762 ~26, G'RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, FLAC 973019-01-1: AP1 5073',320;;~9700, AUTH TD 10860, AUTH COST $474000, ~MOC() W.I. 50. 0000 O?ERAT ~~.,~.~ ~'''''''. Tn~. i0860 FT, PUMP'[ ~u~ $i04~1, CUM tWELL ~ .... ~ ..... ~,.,¢ ¢ 4473 CHRON TI~E DISTRIBUTION (HRS): 2~. O0 .... OTHER, PUMPZN~ - NO ~UA~E -~. ~-*.' -:~. 09/02/86 ,~'-~ ~- QRANITE POINT 18742 #26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION~ FLAC 973019-01-1, APl 50733,2029700, AUTH TD 10860, AUTH COST $474000, A~IOCO W.I. 50..0000 OPERATIONS: TD 10860 FT, PUIdP!N~ . COSTS: CUM MUD $10461, CUM WELL ,$374473 REMARKS: 24 HR AVQ TEST: 332 BOPD~ 498 BWPD; QRAVITY 41. 1; MCF 159; QOR 479; BPOPD 1-/~1 AT 3370 PSI; SPM &8¢ FLUID LEVEL 6400 FT DE?.-'VE'i'.',~ RE(~ION .*** ANCHORAGE FROM SURFACE. CHROi~ T..',...'-iE DISTRIBUTION (HRS): .'::'4. O0 - OTHER, PUMPINO- TESTINg D~.~STRICT -~*~ 09.;08/86 ~'.".,-~ PAgE 09103/86 *** ORA.~-i"'i"E F'C'!NT 18742 ~26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCT,iON, ~-'; '.," - .,uoou, AU COST $474000, , .., ....973019-0I I, API 507332029700, AUTH TD ~" ..... TH Ar'iOCG W.i. 50. 0000 O~'.,.'..;[F~,,!.TIO'?,S: '[D 10960 F'T, ,-,-,c t.!.UD 04 ,.,,.~...T~'-;: Ct.q'1 $I 6i, CUM WELL $374473 (.;'?~f4Fi?4 T ~'.".'!E DISTR I. BUTiON ,.-;4. O0 -. OTHER, P' ~MPINg,., -. NO ~'"t..,,~.,~E · ,~ **. 09/04/86 gRAf, ilTE POINT 18742 %26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, .** ~ ~,-.~* .~...~... ~. ** **~. ~*** ..***..~. **** **¢,. **** ~. * *** * **:~. * **~* ~** **** **** ***.* * *.* * FLAC 973019-01-1, API 507332029'700, AUTH TD 10860, AUTH COST $474000, A!'IDCO W.I. 50. 0000 OPERATIONS: TD 10860 FT, PUMPIN~ COSTS.' C,'JM MUD .m10461, CUM WELL $374473 C.HR!.')!'.~ T l~'iE DISTRIBUTION 24.00 -OTHER, PUMPINg- NO QUAgE 09/05/86 gRAIq].TE POINT 18742 ~26, ORANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, F'LAC 973019-0!-1, APl 507332029700, AUTH TD I0860, AUTH COST $4.74000, ~,~OC,., I. 50 0000 OPERA'TZO¢',~S: TD 10860 F'T', PUMPINg COSTS: CUM MUD $10461, CUM WELL $374473 r.~,,.,,S =-. HR AVQ TEST BOP'D 365; BWPD 503~ gRAVITY 41. 3; MCF 176; OCR 482; BPOPD 1824 AT 3365 PSI; SPM 69~ FLUID LEVEL 6340 FT FROM SURFACE CHRO{'.4 TI~'!E D!STRIBUTION (HRS)' 24. O0 - OTHER, PUMP!NO - TESTINg 1 7 1986 Alaska 0il & Gas Cons. Anchora.~e W. G. Smith District Manager Amoco Production Company Post Office Box 100779 Anchorage. Alaska 99510 907-272-8471 June 23, 1986 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 File: FEW-160-WF Dear Sir: Notice of Intent Granite Point 18742 Well No. 26 Platform Annas Cook Inlets Alaska Attached in triplicate for your approval is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, to notify you of our intent to workover Granite Point 18742 Well No. 26 in order to isolate and squeeze off water production. This well experienced a water influx on June 13, 1986, and production is Currently off 500 BOPD. The proposed workover will investigate the casing integrity, check .perforations for communication and squeeze to provide isolation and shut off water production. The well will then be reperforated and returned to production. We plan to begin this work. as soon as possible. A BOP sketch, and present wellbore diagram are attached. Sufficient notice will be given so that a representative from your office may witness the BOP testing. Any questions concerning this project may be directed to Kurt Unger in our Anchorage office. Very truly yours, W. G. Smith District Manager KWU/dds ' ,cCEIVED J u N 2 6 1986 Attachments 080/rots i ~misslo~ STATE OF ALASKA ALASI~" ..)IL AND GAS CONSERVATION COM~i ~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [~ Change approved program [] Plugging [] Stimulate ,~ Pull tubing [] Amend order [] Perforate [] Other,~ 2. Name of Operator Amoco Production ComDanv 3. Address P.O. Box 100779~ Anchoraqe~ Alaska 99510 4. Location of well at surface Leg 4, Slot 8, GP Plat. Anna 771' FNL, 713' FEL, Sec. 12 TION, R12W. S.M. At top of productive interva~ 2½.6~4.(7 798 TVD) 691' FSL 2 512' FEI Sec. I TION, R12N: ' ' ' At effective depth 10,310' (9831 TVD) 963' FSL, 2,898' FEL, Sec 1, TION, R12W, S.M. At totaldepth 10,860' (10,377 TVD) 1,014 FSL, 2,937' FEL, Sec 1, TION, R12W~ S.M. 11.' Present well condition summary Total depth: measured 10,860 feet Plugs (measured) true vertical 10,377 feet 5. Datum elevation (DF or KB) 105' KB. MSL . 6. Unit or Property name Granite Point 18742 7. Well number 26 8. Permit number 76-77 9. APl number 50-- 733-20297 feet 10..P~lddle Kenai "C" Sands Effective depth: measured 10,310 feet Junk (measured) true vertical 9,831 feet Casing Length Size Structural 622 20" Conductor 2022 13 3/8" Surface 8004 9 5/8" Intermediate Production Liner 2608' 7" Perforation depth: measured Cemented Measured depth True Vertical depth 1285 sx 622 622 1600 sx 2022 1990 700 sx 8004 7600 500 sx 10336 9857 See attached Perforation List true vertical Tubing (size, grade and measured dept~ual 3~}" N-80 at 7,636', F single 3{" N-80 tailpipe at 10041' Packers and SSSV (type and measured depth) None 12.Attachments Description summary of proposal J~ De_t.ail_ed,,,o._~. l'a~ip~s~rogram [] 13. Estimated date for commencing operation June 27, 1986 JUN26 14. If proposal was verbally approved A~a$~a 0il & Gas Cons. G0mmissi0~ Name of approver Anchorage Date approved BOP sketch [] 15. I hereby certify that t~3~-~fore,~ng is true,nd correct to the best of my knowledge Signed ~.~/~']~~~~ Title District Manager Commission Use Only Date06/23/86 Conditions of approval Approved by Notify commission so representati.ve may witness I Approval Nc. re.~ [] Plug integrity [] BOP Test ~ Location clearance l m~j~' Approved Copy ;<~,;.~ :~..~._ ~ Returned ~ / by order of ~' ~'~}[~., Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate . , .~-r~. Amoco Production Company ENGINEERING CHART &,,<-4~,,,.,-,,,,--z ,~_.,,,../~-,,~:r'~-,~/z,;,t SHEET NO. FILE OF / · HYDRIL / ^N NUL,/IR BOF~J I .SL', ! ' t~ t~ r.'~ TY F E ~OP. t CRO%5 I · . · -c/P /._///g- · · "TO ~_. cttokE (,-/ ,, JUN26 19.8.6 Anchorage 11. Perforations C-3 Measured Depth 8,216-8,266 8,270-8,296 True Vertical Depth 7,798-7,845 7,849-7,873 C-4 8,307-8,340 7,883- 7,914 C-5 8,469-8,589 8,035-8,148 8,637-8,660 8,193-8,215 8,680-8,774 8,234-8,323 8,975-9,000 C-6 C-7 9,485-9,530 9,540-9,795 8,518-8,542 9,016-9,060 9,070-9,321 C-8 9,880-10,045 9,405- 9,568 12. Description Summary of Proposal Amoco Production Company plans to perform the following work: 1. Displace well to power oil, shut-in, and determine kill weight requ i red. 2. Kill well with diesel, emulsified diesel or salt water system depending on kill weight required. 3. Set back-pressure valves, nipple down tree, nipple up BOP's and test to 3,000 psi. Pull back-pressure valves. 4. Rig up wireline, cut short string and rig down. 5. Pull tubing and BHA. 6. Clean out with 8½" bit to liner top at 7,728 feet. Clean out with 6-inch bit to TD. 7. If no casing restrictions are encountered, trip in hole with packer and check liner top, C3, C4, and C5 perforations for communication. 8. Set retrievable bridge plug above lowest perforations which are isolated. 9. Based on results of (7)above, squeeze will be the C3, C4, and C5 zones. ,, 10. Reperforate C5. JUN26 11. 12. 13. Retrieve retrievable bridge plug. Run tubing and new BHA. Return well to production. Grani te Poin) '8742 Well No. Wellbore DJ'ab, am 26 '4 Casinq Record Depth 20", 74# CSA 622' 13-3/8", 54.5# CSA (12.615 ID) 2022' 9-5/8", 43.5 & 40# CSA(8.755-8.835~ 8004' 7" Liner 26#(6.276 ID) 7728-10,336' Completi on Record l) 3½" Buttress, 2-7/8" EUE 8RD X-over 2) 2-3/8" EUE 8RD Pup Joint 3) 3½" Buttress x 3½" 8RD X-over 4) 3" Kobe Type 'Bt Cavity-single Depth 5) 3½" 8RD x 3½" Buttress X-over .... 6) Muleshoe Io0¥/ 'Perforations ~ -j 8216-8266' 8680-8744 ' 8270-.8296: ~ ~ 89 75-9000 ' ~-~(/ 8307-8340' ~-7 9485-9530' C-.5' 8469-8589' 9540-9795' 8637-8660' ~ -2~ 9880-10,045' W. G. Smith District Manager April 18, 1985 Amoco Production Company Post Office Box 100779 Anchorage. Alaska 99510 907-272-8471 File: TJZ-124-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission · 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Subsequent Notice Granite Point 18742 Well No. 26 Pla~tf..orm Anna, .Cook Inlets Alaska Attached in duplicate is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, subsequent to pulling tubing, cleaning out fill, and reperforating the C-8 zone in Granite Point 18742 Well No. 26. The.well was returned to production and is currently producing 935 BOPD, 68 BWPD, and 368 MCFD of gas. Any questions concerning this project may be directed to Mike Schwein in our Anchorage office. Very truly yours, W. G. Smith District Manager Attachment MTS/dds RECEIVED APR,[ 9 985 Alaska 0ii & Gas Cons. Commissior~ Anchorage {' STATE OF ALASKA '{' ALASKA OIL AND GAS CONSERVATION CO~vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL 1~ OTHER [] 2. Name of_Operator 7. Permit No. Amoco Production Company 76-77 3. Address 8. APl Number P. O. Box 100779, Anchorage, Alaska 99510 50- 733-20297 4. Location of Well Leg 4, Slot 8, Granite Point Platform Anna 771' FNL, 713' FEL, Sec. 12, TiON, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 105' KB, MSL I 6 . Lease Designation and Serial No. ADL 18742 12. 9. Unit or Lease Name Granite Point 18742 10. Well Number 26 11. Field and Pool Granite Point Fie]d Middle Kenai "C" Sands Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company performed the following work: 1. Circulated and killed well with diesel. 2. Set back-pressure valves, nippled down tree, nippled up BOP's and tested to 2,500 psi. Pulled back-pressure valves. 3. Rigged up wireline, cut short string, and rigged down. 4. Pulled tubing and bottomhole assembly. 5. Cleaned out fill. 6. Reperforated the C-8 zone from 9,888 to 10,045 feet with tub- ing-conveyed perforating guns fired underbalanced. 7.'" Ran tubing and new bottomhole assembly. Bottomhole assembly set at 7,636 feet and tailpipe set at 10,041 feet. 8. Set back-pressure valves, nippled down BOP's, nippled up tree and tested to 4,000 psi. Pulled back-pressure valves. 9. Returned well to production. RECEIVED APR 1 9 ]985 Alaska 0il & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~.~. ~'~ /~.~J.- Title District Manager The space below for Commission use Date 04/18/85 Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10403 Rev. 7-1 ~80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate (AMOCO) W. G. Smith District Manager March 20, 1985 Amoco Production Company Post Office Box 100779 Anchorage. Alaska 99510 907-272-8471 File' TJZ-O94-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Notice of Intent Granite Point 18742 Well No. 26 Platform Anna, Cook Inlet, Alaska Attached in triplicate'for your approval is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells, to notify you of our intent to pull tubing, clean out fill covering the C-8 perforations, reperforate the C-8 zone, and return Granite Point 18742 Well No. 26 to production. Production has recently dropped by approximately 280 BOPD and the fluid level has also dropped approximately 1,000 feet. Fill was tagged on March 6, 1985, at.i.9,931 feet and therefore, 114 feet of perforations are covered with fill. We plan to begin this work as soon as possible. Any questions concerning this project may be directed to Mike Schwein in our Anchorage office. Very truly yours, W. G. Smith District Manager Attachment MTS/dds "t STATE OF ALASKA ALASKA ILAND GAS CONSERVATION C ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~:: OTHER [] 2. Name of Operator 7. Permit No. Amoco Production Company 76-77 3. Address 8. APl Number P. 0. Box 100779, Anchorage, Alaska 99510 50- 733-20297 4. Location of Well Leg 4, Slot 8, Granite Point Platform Anna 771' FNL, 713' FEL, Sec. 12, TION, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 105' KB, MSL 12. I 6. Lease Designation and Serial No. ADL 18742 9. Unit or Lease Name Granite Point 18742 10. Well Number 26 11. Field and Pool Granite Point Field Middle Kenai "C" Sands Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~i~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing ,~ Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco Production Company plans to perform the following work: 1. Circulate and kill well with diesel based fluid. 2. Rig up wireline, cut short string, and rig down. 3. Set back-pressure valves, nipple down tree, nipple up BOP's and test to 2,500 psi. Pull back-pressure valves. 4. Pull tubing and bottomhole assembly. 5. Clean out fill. 6. Reperforate the C-8 zone with tubing-conveyed perforating guns fired underbalanced. 7. Run tubing and new bottomhole assembly. 8. Set back-pressUre valves, nipple down BOP's nipple up tree and test to 4,000 psi. Pull back-pressure valves. 9. Circulate well with power oil and return to production. REC£1VED Alaska Oi~ & Gas Cons. Commission ^nchorage 14. I hereby~fy tha~oing is~me~and corre~Z Signed (_~~.'-... '~ The space below for Commission use to the best of my knowledge. Title District Manager Conditions of Approval, if any: Approved Cop,/ ti kOilll C. SMITH ~v Order of Approved by. COMMISSIONER the Commission Date 03/20/85 Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate L. A. Darsow District Superintendent Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 December 30, 1983 File: WEN-122-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir- Granite Point 18742 Well No. 26 Platform Anna, Cook Inlet, Alaska Attached in duplicate is State of Alaska Form 10-403, Sundry Notices and Reports on Wells, informing you of the work recently completed on Well No. 26. Very truly yours, W. E. Nielsen Supervisor in Charge Attachments LMA/seh ..:",~ :>,, ¢ .:?' .,.: ii[:' ~;~.;' · ,,-~ ;:.,~ · % -,' STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION ~,~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL I-I COMPLETED WELL [] OTHER 2. Name of Operator Amoco Production Compan.y 3. Address P. O. Box 100779, Anchorage, Alaska 4. Location of Well 99510 7. Permit No. 76-77 8. APl Number so- 733-20297 Leg 4, Slot 8, Granite Point Platform Anna 771' FNL, 713' FEL, Sec 12, TION, R12W, S.M. [] [] 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. -- !05' KB-MSL I A_nL ~_8742 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 9. Unit or Lease Name Granite Point 18742 10. Well Number 26 11. Field and Pool Granite Point Field Middle Kenai Sands NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate I'-I Abandon [] Stimulation [] Abandonment Rel3air Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing {~ (.Note: Report multiple, completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state ail pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Amoco performed the following work on Well No. 26 in December 1983. le Se e e Circulate and kill well with diesel based fluid. Set back-pressure valves, nipple down tree, nipple up BOP test to. 2,500 psi. Pull back-pressure valves. Rig up wireline and test lubricator to 2,500 psi. Cut short string and rig down. Pull tubing and bottomhole assembly. Run tubing and, new bottomhole assembly. Set back-pressure valves, nipple down BOP, nipple up tree and test to 4,000 psi. Pull back-pressure valves. Circulate well with power oil and return to production. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signori LO-~, ~'~ ..~..,~ /,~,,,~,.~..~ Title Supervisor in,Charge The space below for Commission use ' I Conditions of Approval, if any: By Order of ApproVed by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate. and '"Subsequent Reports" in Duplicate L. A. Darsow District Superintendent Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 November 4, 1983 Fi 1 e' LAD-1066-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Granite Point 18742 Well No. 26 Platform Anna, Cook Inlet, Alaska Attached in triplicate is State of Alaska Form 10-403, Sundry Notices and Reports on Wells, informing you of the work planned for Well No. 26. The worn bottomhole assembly is unable to optimally lift the well. We plan to pull and replace the bottomhole assembly. Any questions may be directed to Lynn Aleshire in our Anchorage office. Very truly yours, L. A. Darsow District Superintendent Attachments LMA/seh "t ,';., .~1',.,,.f~ ,~-~t~..,::~a, 0ii ;'.Z.. Gasuuns,. £;om~issi0.r~ Anchorage '.'' ' ~" STATE OF ALASKA ~ '..'"' '"' ALA.SK,-, MiL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS · . 1. ' ' " DRILLING WELL[] COMPLETED WELL OTHER [] 2. Name of Operator· · Amoco P~o.duction Company 3. Address : · P. 0. Box.. 100779, Anchorage, Alaska 99510 4. Location of Well " Leg 4,. 'S.lOt ~5, Granite Point Platform Anna · 771.' FNL, 713' Ir. EL, Sec 12,. TION,. R12W, S.M. .... · . -. ; .. · . · . . · .. · 7. Permit No. · 76-77 8. APl Number 50- 733-20297 9. Unit or Lease Name Granite Point 18742 10. Well Number 26 5. Elevation in feet (indicate KB, DF, eic.) "'. I' 6. ·Lease Designation and.Serial No. _ 105! KB~MSI"' .' 'I ' ADL 18742 .' 12, ' ' '- .. Check Appropriate'Box To'Indicate matur..e of Notice, .Report, or Other Data ' ' 'NOTICE 0¢ INTiENTI.O.N TO' .. 1 1. Field and Pool Granite Point Field Middle Kenai Sands [] [] · . · · " ' '(Sub'mit in TriPlicate). , '. ' '.' ' :. ... Perforate"" : .... ' 'El"." .Alter'casing' .. [-1' "Perforations . · Stimdl.ate..'." ..... r-J' . Abandon '1-~ '. . S.timulation . .. .,... , . Repair WeJ.I .' .'..".[] ..'. Chang~ Plank . "" [] .,-:.: 'Repairs Made Pull Tubing · ' ..... ' ,~" ':, ' .'.Other ... ' ' "'t~ ' . "' ' Polling Tubing (Notei R'ep'Qr~ mblt~p"ie cO~ple~ions on' Fo(m 10,~07 with a submitted Form' 10-4~? for each completion.) . SUBSEQUENT REPORT (Subr~it in Duplicate) Iii' Altering Casing " [] Aba~donm~n~ [] Other Describe Proposed: or Comp. leted Operatic.ns .{Clea(l~ State ..all Per'{inent de, ails.and give pertinent dates, including estimated date of starting any. p¢oposed wo~kj for. Abandonment see 201AAC.25..'.10~-170): ' '" .... .. · "' .i ". 'i. Am6c0"'~iian's. i~O,"per'¢'oCm' the".foll'.owing '.wOrE ..on. Nell No. Z6 in November. '. ' 1.983,. : ... , ., · , ,' , .... : ,, , . · , · , 1.; . ·'Circulate'and kill.well wi:.th d~ese1.based fluid. .-.'. : 2..." Set. back-'pressur, e.'valves, .nipple.down tree, .nipple up BOP and test 't.o 2,'500 psi..". 'Puli .bac'k.-.'PressUre Valves · ' '3.'.. 'Rig"up'wi.~'el'.i. ne abd'tes't.lubricat'or to 2;500 psi, Cut. short string and rig dOwn; ..... '4; .. ·.Pull tubing and.' bo'ttomhoie asse.mbly..' .5.- Run-tubing. and 'new bott.omhote assembly. 6. ..Set .back,pres'sure valves, nipple down BOP, nipple up tree and test to 4.,000' psi. Pull back-pressure valves. .7'; CiYcul'ate well With.power oil' and return to production. · , , 14. I hereby certify that the foregoing is true'and correct to the best of my knowledge. Signed Title Di.+-~ct Supcri.+..~..t Date ~1 i II ~kll~kll The space below for Commission use Conditions of Approval, if any: BY L0t{~,,~ i;. [~'~lTff Approved by. ~ "~-'--'~'~" Approved Returned _ _//-/?-,,¢3 BV Order of COMMISSIONER the Commission Form 1'0-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Amoco Production Company P.O. Box 779 Anchorage. Alaska 99510 L. A. Darsow Area Superintendent April 27, 1977 File: LAD-349-WF Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Open Hole Logs Granite'Point 18742 Well No. 26. Following our letter of April 6, 1977, File: LAD-271-WF, we have enclosed an original and one copy of the open hole logs for the subject well for your files. R EC E IVED L. A. Darsow Area Superintendent' APR 28 1977 Division oi 0ii and Gas C01~servatio~ Anchorage Enclosures Amoco ProdUction Company P.O. Box 779 Anchorage, Alaska 99510 L. A. Darsow Area Superintendent April 6, 1977 .? File: LAD-271-WF Hr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Completion Report Granite Point 18742 Well No. 26 Please find enclosed'the Well Completion Report Form P-7, a chronolog- ical drill!n~ history, the directional survey,..and the lab analysis o'f cores for the subject well. We have.not received the final open hole ' logs for this well but copies will be transm/tted to your office upon their receipt. Very truly yours, L. A. Darsow Area Superintendent Enclosures - 8 977 4, SUBMIT IN DVp'.L1CATE' STATE OF ALASKA ','Se~oth,r s', ructions on OIL AND GAS CONSERVATION COMMITTEE WELk COMPLETION OR RECOMPLETION REPORT ~ND COG* WELL WELL EN BACK RESVR. la. TYPE OF WELL: h. TYPE OF COMPLETION: SEW .~ WOng [] ,,' ~:,.,. o,' ~.a NA~-fE OF OPERATOR Amoco Production Company Other 50-133-20297 AP1 NUlW_F..RICAL CODE ADL-18742 6. LEASE DESIGNATION A-ND SERIA~ NO. ~. IF INDIA.N, A.LLO~ OR TRIBE NA/VLE 8. UNIT,FA_R_M OR LEASE NAME Granite Point State 1874 9. W~L NO. 26 ~. ADDRESS OF OPERATOR ~' ~' ?q~ ~'~"? n., ~,,, ~, ~,, t?.....~ ,~, P. 0. Bcx 779, Anchorage, AK 99510 c;:'.. 10. F~-~-BA~IDPOOL, ORV~ILDCAT 4. ,.oc,r,o~ o~ w~ (~ ~oo~t~o, a~a~ aba ~ ~,~ ~,~ ~,~ s~te ~m,!~,t]).":"'-.'~r'..-'c:;~. Granite Point at ~ua~c~ Leg 4, Slot 8, Granite Point Platform An~'~d~'; .... ~" n. ~c.. T.. R.. ~.. ~O~ ~O~ 771' FNL, 713' FEL, Sec. 12, T10N, R12W, S.M. At top prod. interval reported below 691 FSL, 2512 FEL, Sec. 1, T10N, R12W, S.M. At total dep~ 1014 FSL, 2937 FEL, Sec. 1, T10N, R12W, S.M. 13. DA~SP~DDED[14. DATET.D. RF~CHED[lS.',DATECO'MPSUSPORARA/TD. ll6. ELEVA~ONS(DF, RKB, } l ZO5' ~8. T~AL D~H, ~ & TVD~9. PLUG, ~CK MD & ~D~, ~ ~LT~ ~L., 21. ~, 10,377'TVD [ { ~OW~Y' ROTARY ~00LS 10,860' 10,310'~, 983fT~ ~mngAe 0-TD =. P~ouuciNo ~VAr~S), Or ~ZS CO~ZOS~, ~O~O~. ~ ~ A~n ~. 8216' MD - 7798'TVD:', 10.,045'MD - 9568'TVD, "C" Unit, Middle Kenai Sand OBJECTIVE) Sec. 1, T10N, R12W, S.M. '12. PEB, MIT ~O. 76-77 RT, GR, ~'1~)*{17. ELEV. CASINGHEAD I 75' ESL ~NTERYALS DRILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURV~ MADE Attachad 24. TYPE ELECTRIC AND OTHER LOGS RUN . . 1ES, GR-Sonic, GR-D. ensi'_ty Dipmeter · CASING RECORD (Report all strings set in well) CASmG SIZE [ WEIGHT, LB~T. ] 20" [ 74 13-3/8" 54..5 9-5/8" 43.5:40 ' [ LINER RECOl'%D' GRADE ~ DF.,PT~I SET (M.D) J-55 I 622 2-55 ] '2022 s-95 [ 8004 ,. I ! SIZE '[ TOP(MD) I"'iBOTTO~(MD) [SACXSC~VT* I 28. PERFO.RAT O P ' O (In~al, ~ze and number) 8216-8266 8637-8660" 9540-9795 8270-8296 8680-8744 9888-10,045 8307-8340 8975-9'000 8469-8589 9485-9530 All 4JSPF 12rl/4t 80. PRODUCTION C~f~N'TI~G RECOi~D Cement to surface Cement to surface A~OUI~T PUL~ED None None None 700 sx "G" w/.5% CFR-2 27. iUBING RECORD [ SiXtEEN (MD) SIZE DEPTH SET (i~D,) ! PACi(ER SET (MD) - 3-1/2" 7,690 - 2-7/8" 10;096 29. ACID, SI!OT, F~A~C'TLrHE, CE~E'.NT SQUEEZE, ETC. DIilP~{ IITI']~RVAL (MD) ! A1ViOUN'£ f.ND KIND O.F iVI~I~E~IAL USED 9888-10,045 ] 1570 gal '15% HC1 9485-9745 13000 gal 15% HC1 8469-8744 ! 2070 gal 15% HC1 DATE FIRST PftODUCTION 2-7-77 DA0Cm 0r ,ES,. [HOURS TESTED '{CHOItE SiZE {PROD'N ~R 2-24-7~ } 24 ! - {,~sT~ ~OW, TUBING . [CASCO P~S5~ [CAL~~ OI~BBL. I ' - - ~ >;~ 673 Fuel gas and sales 32. c~s~ o~' ~4kc~s~s~s l' FRO.DUCT1ON METHOD (Flowhu.g, gas lii'[, pumping--size and type of pump) 'Hydraulic pumping - 3x2-1/Sxl-7/8 "B" Kobo OI.I..,~BIB L. I' J8 7 I 837 J WELL .STATUS (Producing or ~,~ut-~n).Producing WAI,~A%--BBL. J GAS-O~L rid%TIO i 2 I 3.243 ] 2I 4~ J TEST WITNESSED B~ Chronological drilling hiStory,.logs, directional survey~ core analysis 3~. I hereby eert~ t _h~t th_ejj//~,,, foregoing~.~~~,_ and attaehed~ ./~f'inf°rmRti°n ill completer and correct &s determined, from .l,-availRble record74_/'~/'"77', SIGNED t' ~f~'/.~.~6 TITLE A ea Superintendent DATE ......... *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct w-e!'t complet.o'n-report er~d- lag on' all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (whe..,'e not o..'herwise shown) for depth measure- ments given in other spaces on this form and in any attach:~e:~ts Items 20, anci 22:: If this well is completed for separate prco~uc.'-ion from r.~.ore th~n one interval zone (mull~ple completion), so state ~n item 20, and in item 22 show the p,cJuc;..":g intcrx,-al, o: ~nterv~ls, top(s), bottom(s) and name (s) (if any) for only the interv.~! reported in item 30 S,~;brr,;t a sep,~rate report (page) on this form, aclequately identified, for each add;t~o,al inte~vnl to be seperately producert, show- ing the ackJitionsI data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this -well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~l. (See instruction for iterr, s 20 and 22 above). 34. SUMMAlt¥ ¢}p* FO~.A~A'I"I¢}N 'I'F~'I'S IN('i. UI}IN¢; INT~RVA~ T~S'FED I~H~SUR~ DAT~ ~ ~OV~RI~ OF OIL ~AS_ 35. G~GIC MARK~ ~VAT~ AND MUD DST #1, tested 10,302 - 10,683' i i got deCa~Zs og CesC see repor~ dated ~anuary 3, Z977 ~n the attached chrono~og~ca~ dr~Z~ng hLsCory. ~e~uga 3830 Sca~e "A" 6060 5806 State "B" 6560 6261 - 36. COIIE DATA. A'I'I'A('I! 11~1[~ D[R~I~ON.~ O~ LI-~IIOLOGY.. POROSITY. FHAC~. APP~ .. see a~ched Core Lab Ana~ys2s Core #~ 8470-849~' recovere~ 2~.2~~ - sand an~ ~' conglomerate Core #2 84%-8~00' recow, re~ ~' - conglomerate Core #3 ~0,84~-~0,860~ recove=ed ~8' - sha~e w/sand s~r~ngers ANCHORAGE A PdT. A GP 18742 WELL 26 PAGE 2 10-19-76 10-20-76 , 10~2776 : Granite Point' 18742 Well No. 26 Inc. PBD 1970' , RURT. Bit 1, 12-1/4, S3S, 3-14, clean-out run. Trip 3/4, rig repair 2, tst csg 1/4, tst BOP's 11, RURT 10. Finish level der. rick, tst BOP's to 3000 psi, witnessed by Alaska DOG, ok. Repair Kelly swivel wash pipe packing, install bowl prbtector. TI x bit x.tst 13-3/8" csg..to 1000 psi, ok. Complete skidding mud prop skid x RU same. Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, Imco, 'Amoco°25PC) Total cost to date $66,000. TD 2052' mixing mud, 82' sn-sh, 1 10 500 ' . ' , , · Mud 8.5, 42, 11.5, 9.5, 10, 8, 2/8, 1.2, 750, 40, O. 2/32, 175, 20, 10, 0, 0, desander x desilter off. PP 1250, 500, 2, 98, 6x8x85, 6x8x85'. Bit l, 12-1/4, S3S, 3-14, 2052, 80, 3-i/4, 24.6, 10-20, 80, 5-4-I, rubber locked x drug. Bit 2, 12-1/4, .S3S, 3-13, Inc; Survey 2040, 17-1/4, N4iW. BHA bit, RWP stab 9.30 x'9 x 2-7/8, XO 1.i1 x 8 x 3-5/8,' monel DC 29.78 x 8-1/8. x 2-7/8, 12-1/4 .non-mag stab 5.63 x 8 x 2-13/16~ monel DC 29.66 X 8-1/8 x'2-7/8, XO 2.26 x 7-3/4 x 2-11/16, 12" sleeve stab. 4.62 x 8 x 2-7/8, 7 spiral DC 216.99 x 8 x 2-7/'8, XO 2.56 x 7-'3/4 x 2-7/8, Dailey..jars 33.50 x 6-1/4 x 2-1/4, 20..jts.tg~DP ~12.19 x 5 x 3, 105,000#. Drlg 3-1/4, trip '3-1/2, circ 6-1/2, log 5-i/4, other .5-1/2. Mud cost $1183, $1].83.' Spud 0730 hrs, 10-1.9-76. Finish RU mud props x service lineS,.drl float collar, cmt, shoe x 2022'. Drl 2022-2052' circ tst fm x shoe' to ].]..8 ppg equivalent, ok TO, , , . RU GOI x run CBL,. top cmt 140'. Run.Eastman gyro survey, PU BHA, TI . x wash to btm. Disp hole'x 50 BFW x LSND.mud, mix mud x build volume. Granite Point 18742 Well No. '26 I~c. TD 2833', drlg, 781, sn-sh-coal, 2.. Mud 8.6, 43, , 9, 11, 11, 2/12,'2, 750, 40, 0. 2/32, 175, 24, 11, 6, 0, desander 8.6, 11.2, 2, desilter 8.6, 9.2, 8. PP 2500, 530, 3, 104, 6xSxg0, 6xSx90. Bit 2, 12-1/4, S3S, 3-14, 2764, 712, 16.5, 43, 35-40, 50-80, 4-6-1'. Bit 3, 12-]./4, ~;])S, 3-].2, ]:nc, 69,' , , 40, 80, ]:nc. Suryeys 2294, 17-1/2, N36W; 2723., 19, N38W. BI~ bit, RWI) stab, ].ead DC 7.54 x 7-].3/16 x 2-7/8, 12" sleeve stab 4 62' · , XO 1.11', monel I)C 29.78', 12-1/4" non-mag st'ab 5.6'3', monel DC 29.66', XO, 7 spiral DC, XO, Dailey jars, 20 its HWDP, 112,000#. Drlg"17-3/4, trip 3, survey 1, circ'l-1/2, 'other 3/4. Mud .cost $7426, $8609. Circ x cond m~d, 'dr]., survey, drl, circ, survey, TO. for bit, change BZLA, TI x drig. , , ANCIIOR^Ci". ARE^ GP 18742 WELL 26 PAGE 3 10-22-76 ~0-25-76 Granite Point 18742 Well No. 26 Inc. TD 3755', drlg, 922, sn-sh-coal, 3. Mud 9, 43, 9, 8.5, 10, 10, 2/13, 4.8, 600, 40, 0. 2/32, 175, 23, 15, 30, 0, desander 9.1, 9.5, 1.5, desilter 9.1, 9.6, 10. PP 2500, 530, 3, 104, 6xSxg0,. 6x8x90. Bit 3, 12-1/4, SDS, 3-12, Inc, 991, 24, 41.2, 50-55, 80-60, Inc. Surveys 3120, 18, N38W; 3613~ 15, N39W. Bib% same, 132,000#. Drlg 22-3/4, survey 1-1/4. Mud cost $2450, $11,060. Drl, survey x 3120', drl, survey x 3613',.drlg. Granite Folnt 18742 Well No. 26 Inc.. TD 5522', rep mud pmp, 695-560-512, sn-sh-coal, 6. Mud 8.9, 42, 9.2, 9, li, 11, 3/18, 4.2, 450, 20, 0. 2/32, 175,'23, 16.25, 21.75, 0, desander 9, 11.5, 3, desilter 8.9, 10.3, 12. PP 2375, 530, 6, 104, 6xSx90, 6xSx90. Bit. 3, 12-1/4, SDS, 3-12, 3808, 1044, 25-.1/'4, 41.3, 50+, 60, 6-4-I'. Bit 4, 12-1/4, SDS, 3-12, 4749, 941, 27-3/4,. 33.9,. 50/55, 60/70, 7-5-1.' Bit 5, 12-1/4,.$33, 12-12-13, 5388, 639, 19-1/2, 32.7, 45/55, 120, 6-5-1'. Bit 6, .12-1/4, S33, 12-12-13, Inc, ].34,· 3-3/4, Inc. Surveys .3957, 15, N41W; 4448, 18, N38W; 4693, .19, N37W; ·4939, 20-3/'4, N36W; 5340, 22-3/4, N37W.. BHA bit, RWP stab, lead collar 7.54', XO, monel DC,. 12-i/4"'non-m~g stab, monel. DC, ,XO, 12" sleeve stab, 7 spiral. DC, XO, Dailey jars,' 20'jts HWDP, 160,000#. ,. II Drlg 52, trip 14-1/4, survey 3-3/4, other 2. .. Mud cost $4053, $3616, $470i; $23,432. Drl, TO x change· BI.IA x rubbered.'pipe.. Ti x drl, change pmp'swab~ d~l, survey x 3957', drl, survey x 4448', drl, change pmp swab, drl, surv. eY x 4693','T0 for bit x change out' 28 jts rubbered DP, TI x drl, survey x 4939', drl, .survey x.5340', TO x change bit'x 20 std~ rubbered DP.' TI x'CO'bridges 4926-36', 4961-65', 38' fill on btm, drlg, lost pmp #1 x 0600. 10-26-76 Granite Point 18742 Well No'. 26. Inc. TD 560'8', turbodrlg,'86', sn-sh-coal, 7. " ' Mud 8.9, 44, 9, 9, 11, 13, 3/22, 4.2, 45·0, 40, 0. 2/32, 175, 24, 16, 22, O, desander 9, 11.6, 2, desilter 8.9, 9.8, 12. PI" 1300, 500, 7, 98, 6x8x85, 6xSx85.. " Bi.t O, ]2-1./4, S'3'3, .12-].2-J.3, ~3570, .[}iii, 5, 37.'0, 40-50, ].20, 2-2-1., TO for turbodrill. Bit 7, 12-1/4., MX3A, open, Inc, 32, 2-1/2, 12.8, 5-12, turbo, Inc. Survey 5518, 24-1./4, N37W. BiL& bit, hit sub' 1..62' x 7-5/'].6 x 2-3/8, turboclrl 25.].0 x 6-3/4, 1-1/2' bent sub 1.0 x 7-3/4 x 2-]./4, XO ]..65 x 7-3/4 x 2-]...5/].6, 2 monel DC 59.4~ x 8-i/8 x 2-7/8, XO 2.26 x 7-3/4 x 2-1i/1.6, 1 stco.]. DC 31.16 x .8' x 2-7/8, XO 2.56 x 7-3/4 x 2-7/8, Dailey jars 33.50 x 6-1/4 x 2-1/4, 20 jts 5" IlWDP 612.19 x 5 x 3, 125,00()t/. Drlg 3-3/4, trip 5-1/2, rig rep 7, survey 1-1/4, cite 3/4, other 5-3/4. Mud cost $1204, $24,637. Lost fll triplex x RU Uowc0 T-i0 to circ hole, drlg"x 1 triplex, x T-10, circ x lost Howco pmp' Survey x'5518', TO x. PU. turbodrl, cut dr. lg. line x TI to 2000'. Change out fluid end #1 pmp. Finish TI x turbo; ',,, , , ..... ,, .., ., :',,., r ,,,1 .. .,? ~, ,,~' ...,.~ ................. .,-- · ANCHORAGE APd~A. GP 187.42 WELL 26 PAGI': 4 10-27-76..' .. 10-28-76 Granite Point ].8742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC) Total cost to date $20.8,000. TD 5665', ream turbodrl run, 57', sn-sh-coal, 8, 10,500. Mud 8.9, 43, 9.2, 9, 11,'13, 3/20, 4.2, 400, 40, 0. 2/32, 175,. 24, 15, 23, 0, desander 9, 10.3, 2, desilter 8..9, 9'.~5, 12. PP 2'375, 530, .6R, 104, 6xSx90, 6x8x90. Bit 7, 12'1/4, MX3A, open, 5665, 89~ li-3/4, 7.6, 8-12, turbo, 7-8-0, 1/8" out x seals gone. Bit 6R,' 12-1/4', S33, 12-12-i3-Inc. BHA bit, bit' sub. 3.01 x 7-11/16 x 2.-7/8, ].2-1/4" sleeve stab 4.62 x 8 x 2-7/8, XO 1.11 x .8 x 2-7/8,' monel DC 29.78 x 8-1/8 x 2-7/8, 12~1/4" non-mag stab 5.63 x 8 x 2-13/16, monel DC 29.66 x 8-1/8 x 2-7/8, XO 2.26 x 7-3/4, x 2-11/16, 7 steel DC 216.99 x 8 x 2-7/8, XO 2.56 x 7-3/4 x.2'7./8, 'Dailey jars 3.3.50 x 6-1/4 x 2-1/4, 20 ]ts HWDP 612.19.x 5 x 3, 165,000~/. Drlg 10-1/4, trip 7-1/4, survey 4-1/4, circ 3/4, other 1-.1/2. Mud cost $2267, $26,904. .. .Turbodrl, survey x pull steering tool, turbodrl, .puli eye t~oi'x repair x rerun, turbodrl, prop. pill x TO x eye. tool, TO x turbo x LD Same, PU x TI x B}bi, ream 5576-5665'. Granite Point 18.742 Well No. 26 inc. TD 5811', turbodrlg, 146', sn-sh-coal, 9. Mud 8.9, 42, 8.5, 9, 10, 12, 4/23, 4,1,'300., Tr,.0. 2/32, i75,'21.,. 15,.23, 0, desander 9, .t0,.'l, desilter 8.9~ 9.2,. 7~5. PP 1375, 530, 8, 104, 6x8x90, 6x8x90. Bit 6R, 12-1/4~ S33, 12-12-13, §768, 103, 8-1/4, 12.5, 25-'30, 120, 6-6-I, ream turbodrl run. Bit.8, 12-1/4, S33, open, Inc, 43', turbodrl No. 2.. Survey 5654, 24-1/4, N4~W;.5726., 24, 'N43W. 'BI.iA bit, bit sub, turbodrl, 1-1/2~ bent sub, XO, 2 monel DC, XO, 1 spiral DC, XO, Dailey'jars, 20 ]ts HWDP, 135,000#. Drlg 12-1/2, trip 4-3/4, rig rep 1/2, survey 4-1/2, 'other .1-3/4. Mud cost $2357, $29.,262. Finish ream turbodrl run 5576-5665', drig, surveY x 5654', drl, survey x 5726'~ drl. Pmp pill x TO x PU turbodrl for run No. 2 x TI to 5706'.. Wash 6.2' to btm X 5768', rep break-out line, RU SDC. x run eye x orient tool, turbodrlg. ANCHORAC, E AREA . GP 18742 WELL 26 PAGE 5 10-.29-76 11-1-76 Granite Point 18742 Well No. 26 Inc. TD 5953' drlg, 142' sn-sh-coal, 10 Mud .8.9, 42, 8.4, 9, 10~ 13, 4/22, 4.1, 300, Tr, 0. 2/32, 175, 22, 15, 23, O, desander 9.1, 9.3, 2.5, desilter 8.9, 9.3, 10'. PP 2250, 530, 9, 104, 6x8xg0, 6xSx90. Bit 8, 12-1/4, S33, open, 5859., 91, 8-1/2, 10.7, 8/].2, turbo, 4-4-I, turbodrl. · Bit 9, 12-1/4, X1G, 12-12-13,. Inc, 94' 8 11.9 30/35 75 Inc - ream turbodrl run x drlg. Surveys 585i, 23-1/2, N49.5W; 5914, 24, N49.5W. BRA.bit, bit sub, 12-1/4".E-Z change stab, XO, 2.monel DC, 12-1/4". no~-mag · stab, XO, 7 steel DC, XO,. Dai~ey jars,. 20 jts HWDP, 170,000#. Drlg 12-1/4, trip' 4-3/4,'rig rep 1, survey 1, other 5. Mud cost $2355, $31,617. Turbodrl, pull SDC x RD same, pmp pill'x TO x LD turbodrl. PU BHA x new bit X TI to 5769', wash x ream 90' to btm. Repair leak in.mud line union, drl, circ x survey x 5851' d~lg to 59'53' Granite Point 18742 Well No. 26 Inc. TD 6266' turbodrlg 97-62-154 'sn, sh-coal, 13 Mud 8.8, 41, 8.5, 9, 10, 11,~ 4/17, 3.4, 300, 20, 0. 2/32, 175, 22, 13.75, 18.25, 0, desilter 8.8, 10.1, 12, 'desander off. PP 1300, 530, 13, 104, 6x8x90, 6x8xg0. Bit 9,.12-1/4, X1G, 12-12-13, 5964, 105,. 8-3/4, 12, 30/35, 75, 4-8-1, Pull for turbodrl. ~ .Bit 10, 12-1/4, .b~3A, open, 6080, 116, .9'1/2,'12.2,. 8/12,.turbo, '4-5ri, turbodrl No..3. Bit 11, 12-1/4, MX1G, open,'6112, 32, 7,. 4 6, 8/12, turbo, 8-6-0-3/4" turbodrl No. 4. Bit 12, 12-1/4, X1G, 12-12'213, 6231,. 119,..3-1/2, 34, 25/30, 75/90, 3-'3'1, ream turbodrl run No.' 4. Bit 13, 12-1/4, MX3A, open, Inc, 35,.2,.17.5, 8/10', turbo, Inc-turbodrl NO. 5'. , Surveys 6130, 24,. N60W; 6190, 25, N60W. Bt~ bit, bit'sub, turbodrl, 1-1/2° bent sub, XO, 2 monel.DC's, X0, 1 steel · DC, XO, Dailey jars, 20 its }B~DP, 150,000#. · Drlg 26, trip 21-1./4, survey 3, circ 6-1/4, other 16-'1/2. 'Mud cost $].749, $3701, $2229; $39,296. Drl. to 5964', c:[.rc x TO x,PU turb~drl - run No. 3. TI x turi>odrl,, wasl~ bridge or ledge x 5780', finish Ti to 5950'., ItU SDC x run eye x.orient tooi, wash 14' to btm, turbodrl to 6080', circ btms up, TO x SI)C, prop pil.1 x TO x turbodrl No. 3, TI x turbodrl No. 4, TI x SDC X run eye x orient tool, wasl~ to btm, drl to 6.112' x tuebo.drl stalling, pull eye x TO x turbodrl No. 4 x LD same. Change BHA x TI x bit No.. 12 x SLM. Wash x ream 5598-6112', drl, surveY.x 6130', drl, survey x 6190', circ x pmp pill, TO x LD BIIA, PU'turbodrl x TI, run SDC eye x orient 'turbodrl, drl 30' fill, turbodrlg - run No. 5; ANCHORAGE AREA GP 18742 WELL 26 PAGE 6 11-2 -76 11-3-76 Granite Point 18742 Well No. 26 Inc. TD 6427', drlg, 161', sn-sh-coal, 14. Mud 8~8, 42, 8, 9, 12, 12, 4/16, 3.4, 350, Tr, 0. 2/32, 175, 20, 13.75, 18.25, O, desander 9, 10.9, 2'5, desilter 8 9, 9.6, 12. ' PP 2250, 530, 14, 104,. 6x8x90, 6x8x90. Bit 13, ~X3A, open, 6310, 79, 8-3/4, 9, 8/12, turbo, '6-6-0-1/2", turbodrl run No.'5. Bit 14, MX1G, i2-12-13, Inc, 117, 8, 15, 14.6, 45, 80/90, Inc. Surveys 6345, 24, N69.5W. BIIA bit,~ 12-1/4" sleeve stab, XO, mohel DC, .12-1/4" non-mag stab, monel 12" DC, XO, 1 spiral DC, sleeve stab, 6 steel DC, XO, Dailey jars, 20 its HWDP, 215,000#. Drlg 14-1/4, trip 5, survey 1, other 3-3/'4. Mud cost. $2579, $4!,876. Run. SDC eye, turbodrl, p~ll out x eye tool,'TO x LD 'turbodrl, PU BltA x TI'x 6200' wash 6200-6280' X ream 6280-6310' 'drl,'circ x survey x 6345' drig. Granite Point 18742 Well No."26 Inc. (PDC Rig 152, Imco, Amoco 25PC) Total cost to date $420,000. TD '6535' turbodrlg, 108' sn-sh-'coai, i5, 10,500. Mud 8.9; 43, 8.6, 9, 13, 11, 3/18, 4.2, 350, 20, 0. 2/32, 175, 21, 15, 23, ~0, desilter 8.9, 9;1, 12, desander off." PP'1575~ 530, 15, 104, 6x8x90, 6x8x90. Bft 14, 12-1/4, ~X1G, 12-12-13~. 6495, 185, 14, 13.2, 45/50, 85,.6_6_I. Bit i5, 12-1/4, MX1G, 0-20-20~ Inc, 40, 3-1/2 ' ll.4, i0/12 turbo turbodrl'run No. 6. " ' ' ' Surveys.6436,'23-1/2, N68W.' ' Bib% bit,' bit sub, turbodrl, 1-1/2° bent .sub, XO, 2 monel DC, XO, i steel DC, XO, Dailey jars, 20 jts HWDP, 160,000#.' Drlg 9-~/2, trip.6,'rig rep 1/2, survey 1, .circ .1, other 6 Mud cost ~.2206, $44,082.. . Drl, repair No. 2 pmp, drl, Survey x 6436' .dri lost power 1 hr, circ, TO 'x PU turbodrl. ' ' , ! ANCHORACE AREA GP 18742 PAGE 7 WELL 26 11-4-76 1'1-5'76 Granitc Point 18742 Well No. 26 Inc. TD 6752' drig, 217, sn-sh, 16 , · · Mud 8.9, 44, 9.2, 9, ].4, 13, 4/24, 4.2, 400, 20, 0. 2/32, 175, 22, 15, 23, 0, desilter 8.9, 9.2, 12, desander off. PP 2200, 530, 16, 104, 6xSx90, 6x8xg0. Bit 15, 12-1/4, X1G, 20-20-0, 6578, '83, 7-1/2, 11, 10/15, turbo, 6-6-I, turbodrl No. 6. .. . Bit 16, 12-1/4, MX1G, 12-12-13, Inc, 174, 8, 21.8,. 45, .80, Inc. SurVey 6621,. 22-3/4, N76W. BHA bit., 12-1/4" stab 5.50 x 7,7/8 X 2-7/8, lead collar 7.54 X 7-13/16 x 2-7/8, XO 1.11. x 8 x 3-5/8, monel collar 29.78 x 8-1/8 x 2-7/8, 12-1/4".non-mag stab 5.63 x 8 x 2-i3/1.6, monel collar 29.66 x 8-1/8 x 2-7/8, XO 2.26 x 7-3/4 x 2-11/'16, 1 steel DC 31.].6 x '8 x 2-7/8~ 12'-1/4" stab 4.62 x 8 x 2-7/8, 7 steel DC 217.03 x 8 x'2-7/8, XO, Dailey jars 33.50 x 6-1/4 x'2'1/4, 2.2 jts 5'.' HWDP, 180,000~. D'rlg 12, trip 6., rig rep 1, survey i, .circ 1/4,'.other 3-3/4. Mud cost $2374~ $46,455. . Orient SDC eye, drl, circ, puli eye tool, TO x change BI. LA 'x PU new .jars x TI, wash x ream thru turbodrl run x 6460-657.8'. Change swab No. 2 pmp, drl, survey x .6621','drig. Granite Point 1874.2 Well No. 26 Inc. TD 7020', drlg, 268', sn-sh, 17: Mud 8.9, 44, 8.6', 9, 14, 14', 4/20, 4..2', 400, 20, 0. 2/3.2,..175, 22, 15, 23, 0, desilter 8.9~ 9..2, 12, desander, off..' PP 2400, 530, 17, 104, .6x8x90,..6XSxgO.. Bit 16, 12-1/4, MX1G, 1212-13, 6863, '285, 15-3/4,.'.18, 45-50, 80, 7-6-.1. Bit 17, 12-1/4, MX1G, 3-12,· Inc, 157, 7-3/4, 20.2, 50, 100, Inc.' Surveys 6747,. 22-1/,2, N76W; 6807,' 22-1/.4, N76W; 6959', 22~'1/4, N76W. BHA' same, string wt 190,0001[. Drlg 15-1/2, trip 4, rig rep 3/4, survey 2-3~4~ other 1. Mud cost $3'004, $49,·354' Drl, survey x 6747', rep mud line, 'dri, survey x 6807', trip for .bit x' wash x ream 50' precautionary, drl, survey, x 6959' drlg ANCHORJ~GI': AREA GP 18742 WELL 26 ' PAGE 8 11-.8-76 11-9-76 11-9-76 11-10-76 Granite Point 18742 Well No. 26 Inc. TD 7836, drlg, 280-277-259, sn-sh, 20. Mud 8.9, 43, 9, 9, ifF, 13, 14/18, 4.2, 350, 20, O. 2/32, 175, 21, 15, 23, O, desander 9, 10.3, 2, desilter 8.9, 9.6~ 12. PP 2550, 530, 20, ].04, 6x8x90, 6x8x90. Bit 17, 12-1/4, ~D(1G, 3-12, 7188., 325, 13-3/4, 23.6, 50, 100, 7-5-I. Bit 18, 12-1/4, X1G, 3-12,. 7402,' 214, 11-1/2, 18.6, 50, 100, 7-5-I. Bit 19, 12-1/4, SDGH, 3-11, 7638, 236, 16-1/2, 14.3, 50, 80, 7-5-0-1/8". Bit 20., 12-1/4, SDGH, 12-12-13, Inc, 198, 12-]./2, 15.8, 55,.100, Inc, Surveys 7132,. 22-1/2, 'N76W; 7365, 22, N75W; 75.77, 21-1/4, N72W. BltA bit, 12-1/4'.' sleeve stab, lead collar, XO, monel, 12-.1/4" non-mag stab, monel, XO, 12-1/8". sleeve stab, 6 steel DC, XO,' Dailey jars, 22 jts ~B~P, . 192,000~t. Drtg 47.-1/4, trip 16-1/2, rig rep 2-1/4, survey 2-1/4, circ 1/2, other 3-1/'4. Mud costs $1427, $3278, $35.84; $57,644. 'Drl, circ, survey x 7132', TO x LD 29 jts rubbered DP, tst BOP's 2500.psi, ok. Repipe shaker discharge line~ TI x..PU 29 jts plain DP,' ream .bridge 6852-6890', drl~ survey x 7365', trip for bit, cut drlg line, wash x ream 30' to btm, drl x hole 6ond good, drl, survey x 7577', trip for bit, drlg. Granite 'Point 18742 Well No. 26 Inc. TD 8'013', trip, 177', sn.-sh, 21. Mud 8.9, 46, 8.5, '9, 15, 14, 4/23, 4.2, 350, 20, '0. 2/32, 175, 21, 16.25, 21.75., 0, desander 9.1, 11.5, 2, desilter 9, 9.6, 12. PP 2600, 530, 21, 104., 6XSx90, 6x8x90. Bit 20, 12.,1./4, SDGH,.12-12-13', 7851, 213, .14-1/4, 14.9, 55, 100, 5-6-1. Bit'21, 12-1/4', SDGH, 12-12-13, 8013, 162., 10.-1/2,. 15.4, 55., 100, 7-6-0-1/8". Bit '22, '12-1/4, X1G,. 12-12-13, Inc - TI. 'Surveys.7794, 21, N73W; 7968, 21, N71W. BHA same, 200,000~t. ' '. ' Drlg. 12-1/4,: trip 9-1/4, survey'l-i/4, cir.c 1/4, other 1. Mud Cost $3432, '$61,076.' Drl,.circ, survey x 77'94", trip for bit, CO bri'dge. 7452-7470', 35' fill on btm, drl,,survey x 7698', .trip for bit. G~'rtn:l.t:~: 'l.'o:i.C 18742 We.il No. 28 ],n,c. l?l~,l) 9873' WI.' dow,~ Granite Point 18742 Well No. 26 ].uc. (PDC 15'2, Imco, Amoco 2'.JPC) Total cost to itate $549,000. TI) 82].1', m:ix:i, ug nut'p].~g, ].98',. sl~-sn,' '22. Mud 9, 43, 8.'7, 8, 12, 12, 3/22, 300, 40. 2/32, 175,. 24, 13.75, 31..63. Note: Mud wt now' 8'9 ppg. Bi~ 2.2, X1G, 2-12,..1-13, 8140' 127 Inc (NR) ];it 23, S-44, 2-12, ].-].3, Inc. BIIA same. , Finish trip x 8013' x drl 12-1/4" 'hole to 8140'. Trip for bit x drl 12-1/4" hole to 8211' x'l°st'returns 40' in. to C-3 sand.. Pipe stuck X jarred loose x pull up to 7875'. Mix'nut hulls. ANCtlORACE AREA GP. 18742 PAGE 9 WELL 26 11-11-76 Granite Point ].8742 Well No. 26 Inc. TD 8211, ci. rc out kick, 0', 23 days. Mud 9.2, 38. Bit 22, 12-1/4, XIG, 12-12-13, 8140, 127' 55 100 7-5-]. Bit 23, 12-1/4, S44, 12T12-13, Inc. BRA same. Lost ci~c 24' Mud cost $6234, $69,043. ' ' Stuck pipe after lost returns x 8211", lost approx 180 bbls'surf'ace volume,.ja.rred x pipe free, pull up to 7875' x build mud volume. Fill. pipe x found fluid 'level x 750'. Mixed 3 nut p%ug pills x experienced flow. SI'x ck press, DP x csg pres.s O. Experienced second fiow~ circ water cut mad x gas through choke, csg press 250-100 psig x max DP press 75 psig~.no DP press response or.returns x increased pmp rate. Mix x prop 50 bbl.' pill..10 ppg x nut hulls x no DP press. Experienced. several kicks'x circ x incr mud wt to 9.2 ppg. Mix .x pmp two Quik-Seal pills, regain returns x DP press' incr te 675' psig .x csg press tO 500 psig. Continue prop 9.0 ppg mud 'x 8.7 ppg returns, circ x inlet line to degasser cut out x SI to · rep. .Csg press incr x 1250 psig while SI' Rep degasser x resume. circ, DP 'press 1300 psig x'csg press 1400 psig. Bled csg pr.ess thru. choke to reduce DP press to 600 psig x csg press, to 700 psig. ~ Circ thru choke X final csg press 175 psig x'DP press 600 psig. Mix x prop 50 bbl Quik-SeaI' pill, circ, csg press 0 psig x DP press '500 psig. Shut do~ p~np x open HYdril x work pipe, PU 260,000~ . x SO 165,000//, .circ; fluid level in csg dropped x experienced flow, SI Hydril x'put b~ck on'choke. SI DP press 0 psig x SI csg p.ress, o~, 275 psig. Resume Circ th?u choke, x' 600 psig DP pres's.. prani, te Point .1~74.2 Well No. 26 In~. TD 8211' Circ, 0' '24 days Mud 8.8, .33, , 8.5, 5, 7, 4/9, 3.3, 1500, '40, 0. 2/32, 175, , 10, , ,'desander 8.8, 11.8, 10.0, d'eSilter off. PP 400,'147, 23, 2'9, 6x8x50. Bit 22, 12-1/4, X1G, 12-12-13, 8140, 127, '10-1/4~ 12.4, 50-55, %00, 7-5-I. Bit 23, 12-1/4, S44, 12-12-.13, Inc,' 71, 3-3/4, 19, 50, 100, Inc. Survey 8100, 21, N69W. BI~ same, 200,000f/. Lost circ 2Z~. M~d cost $6349, $75,392. Detected kick 0600 hfs, closed llydril, SI.IH' press 0, SI CP 275, est gain 150 bbls. Circ at 45 spin, DP press 525 x CP 375. Mix 50 Quik-Seal pill x 5 ppb fine Q.uik-Seai, pill. wt 9.2 ppg,.pmp pill,. DP press 600 x CP 350. Final I)P press 625.x'CP .1.50, gas x wtr cut mud returns, 9 1 ppg ~n x 8 9 ppg out.. (.,:~.~.c x attempt' to k.[ll wc]~ CI' incr to ].300, SI x RU to lubricate down annuJ, us., rep choke mani- fold, prop' 230 bb.l.s 9.1 ppg into annu.l~r; x .1.300 psig, harl returns through DP, mix Quik-Seal pill x 15 ppl) fine, circ p:Lll down Bled drygao,' ,= from. c'"~'.,,,.,, c:l. rc x recover 9.3. l'~pg mud. Lost returns x 490 bbls in x returns gassy. Contin.ue to' l.)mp x ~TegaJ. t~ed mud returns, Si x ck flow, no flow on annulus, mix x pmi) 50 bbl Quzl~-,.~c.a! pill x 20 ppb fine'x mod .Quik-Seal. Disp pill x 8.8 ppg mud x mod Quik-' f'tt1"~'~ I'~r'l'l~''~ I'~,1 I ~',,~ '~'~, ..... .'~" ~ : ' ' ~'~ .... .................... .. , ANCIlO~AGE AKEA GP. 18742 WELL 26 PAGE 10 11-15-76 11-16-76 Granite Point 18742 Well No. 26 Inc. TD 8211' PBD 7986' condition hole to log, , , 27 days. Mud 8.8, 34, NC, 8.5, 5, 7, 5/10, 3.3, 1200, Tr, O. 2/32, 175, 48, 13.75, 17.25, 0, cyclones r.un .as required. PP 500, 353, 23R, 69, 6xSx60, 6x8x60. Bit 23, 12-1/4, $44, 12-12-13, 8211, 71, 3-3/4, 19, 50, 100, 222-1. Bit 23R;' 12-1/4, S44, open,, trip to dress plug.x condition hole. Bib% bit., bit sub, 3 DC, XO, ·jars, 22 jts IIWDP. Drl cmt 1/2, trip 22-1/2, 'lost circ 21-3/4, circ 21, cmt 1, other 5-1/4. Mud cost $3460, $1583, $2139., $82,575. Circ x condition mud x work pipe x 7850'. Mix x prop 50 bbl Pill x 10 ppb f x m Quik-Seal x 8.8 ppg. TI from 7850'. x tag fill x 8065', .PU off btm x'circ btms 'up x 8035'. Mud 8.8 in and out. Short trip .10 s~ds x cir~ x little or no .gas. ~'O x' tigl~t' x 6094' x worked thru. TI x open-ended DP to 8040' x circ btms up, returns gas 'cut. Spot 50'bbl pill x 22 ppb coarse'Quik-Seal, x 10 ppg on btm. PU 4 stands x press to 350 psi x lost small amt pf mud, then held. Could not reverse.. Circ x condition mud. Mix x spot 50 sx'Cl'ass G cmt + 0.5% CFR-2 mixed' 15.6 ppg from 8040-7970', in place '0550, 11-14-76. Pull ".5. stands x circ x'7582'. Close Hydril x incr press to 225 psi for '5 'minx release. Circ.x 175 GPM x TO. TI x bit' to 7521'. x break circ x condition mud x ..350.'GPM. TI x tag fill x 7889' x wash x ream 7889-7906'. Circ btms up x continue wash x ream to 7970' x hit cmt' Drl firm cmt 7970-7986' 'x circ to condition hole x mud to 'log. ., Gr. anite Point 18742 Well' No. 26 Inc. .. TD 8211' logging, 28 days Mud 8.9., 32, NR, 9.5,·.3', 5, 1/1, 4, 1200, Tr, O. 2/32.+, 175, 46, 15, 23,. 0, cyclones.down. PP 550, 353, 23R, '69, 6xSx60, 6x8x60.. Bit 23R, 12-1/4, S44, open, 7986,' 16' cmt~ 1/2, 32., 5-10, 40-60,. 3-3-I, clean out 'fill, dress cmt plug x condition 'to log' Trip 4-1/4, circ 7-3/4, 'evaluation 9-1/2, other 2-1/2. Mud cost $1539, $84,115. Circ x condition ho].e' to log, TO x.stan~l bnck BIIA. Nipple. down flow " ll',,~, niPl)le x NU .kubr. icator x RU ~;C,}I].UlLII)t".I:};el:'. Ihlll '" .l. lll:[..'.ll,'t~ll Oil ,~';!> X reran, ok. R{.i[i $ou:Lc-(ll( Q/O ccUl;l:al:t, zer,'~., in order to ,.,-et. tl~rough' lubricator x log. approx 1000' 'Off buttom, '1.o1.', (luality.1)oor' 'l.'ull Sonic x run Dipme. ter ]'og x stuck lO0' off bo~Com. Collapsed arms x hold strain on tool x .came loose in 3'.0 min. TO x Dip. 6-1 sand top x 7910' · AN6~IO Rf~GE AREA GP. 18742 WELL 26 PAGE 11 11-17-76 11-18-76 11-19-76 Granite Point i8742 Well No. 26 inc. (PDC Rig 152, imco, Amoco 25PC) Total cost to date $702,000. TD 8211', RU to run 9-5/8" csg, , , 29, 10,500. Mud 8.9, 37, , 11, 6, 6, 2/8, 4.2, 1200, Tr, 0. 3/32, 175, 31, 17, 20.5,'0, desander 9,.11.5, 3, desilter off. PP 600, 470, 23R, 92~ 6x8x80, 6x8x80. Bit 23R,. 12-1/4, S44, open,. 8000', 14'(cmt), 1-1/4, , 30, 60, '3-3-I, drl cmt. BI-i~ bit, t2-1/4" stab, lead DC.,' XO, DC, 12-1/4" st'ab, DC, XO, 12-1/4" stab, Dailey jars, 22' its HWDP. Drlg 1-1/4, .trip 10, rig rep 2-1/4, circ 6, log 3, other 1-1/2. .Mud cost $1883, '$85,998. Fir"$h' loggi'ng, ND SWS lubricator x NU 'flow nipple x flow' line, TI x 2000', '-Z .cut drlg line x 'change out brake band, TI x 7907' x. tag fill, circ out. gas cut mud. .'CO fill .to 7986' x drl firm cmt'to 8000', cir'c, short trip 10 stands, circ x cond hole for 9-'5/8" csg, .TO x LD .BI.L~, remove 1.' ~1 protector. '. ' Granite Point 187Z~2 Well NO. 26 Inc. TD 8211', set 9-5/8" csg hanger, , , 30. Mud 8.9, 36,', 11, 5, .5, 2/5, 4.2, 1200, 20, O. 3/32, 175, 29, 18.75, 19.25, O, desander x desilter offf Csg x cmt 2i,. Other. 3. '' Mud cost $968, $86,9.67. Remove bowl protector x RU to :.run csg. Run 184. jts 9-5~8", .40 x 43.5~! S-'95 Buttress csg, circ x prop do~ tsg from 7965-8000'. Shoe x 8000", float collar X '7910','stage collar x 2%77'.. Cmt 1st stage x 350 sx Class G x 1/4f~/Sx Flo-cele + .6% Halad-9 + .5%'CFR-2 +..2% NFP, i5.8 ppg. F011ow x 150 sx Class G + .5% CFR-2, 16 ppg.' Disp x mud x good returns,, bump plug x 1000 psi x floats held'.' Drop.DV bomb,.- open collar x 825 psi, mix x prop' 200 sx Class G neat x 1.6..2 ppg, disp x mu~. Close DV tool x 2000 psi, held for'2 min.x bled off press x press up again to 2000 x held 'ok. CIP 0300 hrs, 11-18-76. 'Fui.1 returns. PU BOP's x set csg hanger, hang'x Cut off 9-5/8" csg. Granite Point 18742 Well. No. 26 Inc. .. TI) 8211', run gyro, , , 31. ' M~I ~.9, '.if;, , .'l.I, 4, 5, 2/4], 4, J. 200, ',.!O, O. ~/32, , 34, ,.Lg, iI9, 0', de,';,aL~tle. J' ~.~, dL.!~:I/..I.L~:J.' PP 500,. 529,. 24, 250, 6xSx90, 6xSX90. Bit '24, 8-.1/2, X1G, open, Inc-CO run. , 'BIIA bit, bit sub, 3 DC,. XO, Dail. ey jar.,;, 22 jts IlWDP. '" Drlg 3/4, trip 5-1/4, log 8, other 10. Mud cost $105, $87,072. 9-5/8;' csa 8000', 11-18-76. ., NU BOP's,' install tbg head x tst x '2500 psi, ok. PU BII.A x TI x 2136' DP measurement, dri DV tool, TI x 7897' x push junk to btm,. TO, RU temp survey x gyro. RU x run gauge rin.g x stopped x 7885'. Rt,n temp survey,, lower cmt top x 6919', upper cmt top x. 195~0'. 'Run gyro~ survey 7500-1800' x 100' benches. ANC~{ORAGE AREA GP. 18742 WELL 26 PAGE 12 11-22-76 Granite Point 18742 Well No. 26 Inc. TD 8222', drlg cmt 'retainer, 0-11-0, 34. Mu.d 8.6, 37, , 10, 5, 9, 5/10, 2, 200~, 240, 0. 3/32, , .52, 15, 3, 0, desander x desilter off. PP 7.50, 500, 25, 234,. 6x8x85, 6x8x85. Bit 24, 8-1/2~ X1G, ope,L, CO run' Bit 25, 8-1/2, X1G, open, Iht-CO run. B}LA bit, junk baslcet, junk basket, 3 DC, XO, Dailey jars, 22 jts tBqDP. Drlg 4, trip 10-3/4, 'lost circ 53-]./2', cmt 1-3/4, other 2. Mud cost $838, $5517, $2136; $95,565. Finish ru'~% gyro, tst rams x ch manifold x 3000 psi x l~ydri'l x 1500 psi,. ok. Tst cs.g to 2000. psi,. ok. PU' BItA x TI x rubbered DP. Drl float collar"7903' drl cmt x sl~oe x 7991' drl cmt to fill x 8202' .l_p~t . . , , , eirc x 7 'bbls pit. .loss,.PU to 8000', mix 50 bbl pill x 25 ppb Kwik- Seal, attempt to. fill hole x 200 BW, no level, pmp pill x DP press O. Mix x pmp se.cond Kwik-Seal pill, got DP press x 40 bbl .x cont prop x disp Pill, close'l{ydril x sq x 125 psi, prop 10 bbls at'.3-1/2 BPbi, fm'broke back to 50 psi x cont disp 40 bbl pill, mix pill f;3,' 50 bbls. x 27 ppb c x m Kwik-Seal. C.l'o~_iLy. R!i%.., disp pill x no DP press. Mix x .prop 200 bbl pill x 46-49 ppb reed fn..nut plug, pmp 32 BW, close ilydril x press to 350 psi, 'bled to 250 in 10 rain, prop 1/4 BW x'press to 400, bled to '325 in 10 rain, bleed', press x open Hydril, circ x 8.8f! mud x full rett, rns. 'TI'x 8171', lost 'circ temp x regain, wash' -' x ream to 8211', drl to 8215' x l_,~ost__..,..returns,..~ ............ PU to' 8000' ,..prep. . to drl without returns, TI x dr.1 without retorns 8215-8222' PU to 8000' mix.x prop.pill ~/6, 50'b~I. x 32 ppb c,x-m 'Kwik-Seal. Disp x 116 BW x 'sq t.o 250 psi. TI x CO 8.200.-8222' x lost returns. Spot 50 bbl vis pill x TO. TI x""i~%Z drl cmt ret'x set x .7800'. Mix x prop 300 sx Class G x 16.2 ppg. Disp 'x 145 BW, 7 BW below retainer, sq to 9.00 ps'i, stop pmp x preas'drop to 0, rev circ x no cmt returns, TO, PU 2 junk baskets x TI. Disp hole x 8.6 ppg mud, drlg cmt retainer. . Bit 38, 8-1/2, .SDGH, 3-20,.7009, 54, 9,'6, 12, Bit'39, 8-]./2, S[)(]~{, 3-13, ]'nc, 95, 6-1/2, 14.6, 45, 90, Inc. · Surveys 6920, 16, N24E;.6974, 15-1/2, N16E; 7035, 16., N6E. Bib% bit, 8-1/2" reamer 6.12 x 6-1/2 'x. 2-1/4, XO 2.98 x 6-1/4 x 2-7/8, 2 moncl DC 52.24 x 6-1/8 x 2-7/8, 8-1/2" stab /4.58 x 6-I/4'x 2-7/8, (i l}C 184'04 x 6-.[/~! x 2-7/8, X(.) 2.55 x b-1/4 x 2-..7/~{, 5 ,it:; I1~'II)1' 152.76 x 5 x 3, Daiiey jars' 33.15 x 6 x 2-3/8,. is'j ts I1WDP 5.50.23 x 5 x 3, XO 2.1:3 x 6 x 3, 140,000tI.. '" Drlg 15-1/2, trip 16, rig rep 1/2, sur. vey 6-1/2, circ 1-1/2, other 321. Mud. cost $12,764, $8459, .$5978; $188,945. Finish mix 10.4 ppg mud, ¢lisp hole x new mud, circ,'TO x LD 93 jts DI:, RU SDC x run gyro survey to 6800',' £ID..'SDC, PU.dynadrl x TI x rubbered D.P, RU Kelly hose on steering tool head, RU x run 'steering tool x orient dynadrl, dynadrl 6955-7009', pull steering tool, TO x LD dynadrl, change x PU BHA, TI, slip'drl line x finish TI, ream .6955- 7009' 'drl survey x 7035' drlg , ,' , · .. AI'ICUOA~AGE AREA GP. 18742 WELL 26 PAGE 13 11-23-76 11-24-76 Granite Point 18742 Well No. 26 Inc. TD 8222', WOC, , 35 days. Mud 8.6, 37, , 12, '5, 14,.9/12, 2, 1500, 20. 3/32, , '56, 12.5, 5.'5, desander x desilter off. PP 300, 265, 26, 127, 6x8x90. Bit 25, 8-1/2, X1G, open, 8192, 382, 10-3/4, 4-6-1, drlg cmt x ret.. Bit 26,' 8-1/2, X1G, open, Inc. BI. bi same. Drlg 8-1/4,' trip 12~1/2, circ 1/4, cmt 1-1/2, WOC. 1-'1/'2. blud cost $3698, $99,368. Drl ret 'at 7800', TI x tag cmt at 7852'. Drl hard cmt to 8192i x lost .circ. .Pull out to' 8000'. Trip,..run E-Z Drl ret x set at 7952', circ x fill DP x csg x mud. Mix x prop 200 sx/Class G cmt at 16.2 ppg. Disp x 153 bbls. fluid at 900 psi. Rev 7 bbls wtr. Trip for bit x Blbi. Drl ret @ 7952", TI x feel fOr cmt. Tag cmt at 8078",. drl soft cmt to 8109'. Pull 2 stds x ci~c, WOC. .. Granite Point .18742 Wcll No. 26 Inc..(PDC Rig 152, Imco, funoco 25PC) Total cost to'date $1,091,000. · ' TD 8288', TO, 68', sn~sh-coal, 36, '10,500. Mud 8.5, 32, , 12, 3, 6, 4/5, 1.2, 1700., 20, 0. 3/32,., 59, 13.75,. , , desander x desilter off. PP 350,' 2, 26, 140, 6x8x90. Bit 26, 8-1/2, X1G, open, 8288', 96',.11-1/4, 8-1/2,. 20-25, 50-60, 6-6-I. BHA same, .178,000~. .. Drlg 7-1/4, trip 3-1/4, lost ~irc 3-1/2, other 101· Mud cost $3548, $102,917. Ti~ drl cmt 8109-8190", PU to '8000', circ x'mix two 50-bbl pills x.32'ppb. Kwik-S'eal x spot 'pills,~ TI x drl cmt. x fill 8189-8222'. Shut down. pmps x observe hole at 8201' x 8222~ x no change in FL, drl to 8232' · . , ' circ x check for lost returns, ok, PU to 8000' 'x circ btms up. TI, ~.. drl 8232a8288' PU to 8000' x circ hole, TO ii ,. I ANCHORAGE AI:~EA GP. 18742 WELL 26 PAGE 14 11-29-76 Granite Point 18742 Well No. 26 lnc. TD 8682', drig, 60-122-0-86-126, sn, 41. Mud 8.7, 42, 9.4, 9.5, 1I, 11, 3'/9, 2.7, 250, Tv, 0. 2/32, , 20, 12.5, 12.5, 0, desander x desilter off. PP 1200, 353, 32, 168, 6xSx55, 6x8x55. Bit 27, 8-1/2, SDGH, open,. 8348, 60, 6-3/4, 8.8, 20/25, 60, 4-4-I. B'it 28, 8-1/2, SDGH, open, 8470, 122, 9-3/4, 12-1/2, 25/35, 60.,. 6-6-I. Bit 29, 8-1/2, 'Cbristianson diamond, , 8500, coring), runs. .Bit. 30,. 8.-1/2, SDGII, 12-1.2-B, 8599, 99,. 6-1/4, i5.8, 30-40, 60, 7-5-I. Bit '31, 8-1/2, S-44, 12-12-B, 8658, 59, 4-1/2, 13, 30-40, '80, 7-5-1. Bit 32, .8-1/2, .F-2, i2-12-B,. Inc. Surveys 8310, 21,.N68W; 8435, 20-i/2, N66W; 8565, 20-i/2, N65W. BI. LA bit, .8-1/2" stab, monei DC, 8-.i/2" non-mag stab, monel DC, 8-1/2'" s~ab, X0, 6 steel DC's, XO, .Dailey jars, 21 jts HWDP., 200,000#. Drlg 29-1/4, trip 47-1/4, rig rep 3/4, survey 2-i/2, circ 3-1/4, et. her'37. Mud costs $664, $1033, $5244, '$47'7, $1552; '$111,888. Formation tops'- C-5 sand 8463'. Finish'TO, PU Bit '27 x change Bt. LA, 'TI x 7980", ream 7980-82'88', drl. 8288' 8348', Work pipe x circ to survey, drop survey x'PU to 8000'. Attempt to retrieve survey'x tool stuck, wire broke, 'TO x 'survey, tst BOP's x. manifold x 2500 psi, ok. TI x new bit, wash x ream 8225-8348', drl, work pipe, drl, work pipe, drl to 8470', PU to 7.790:, hole '.tight 8410- 8250'. Dump x clean mud pits x 'build new system, cond mud, .TI x 8470', hole tight .8~25-84'70), 20' fill on btm, disp mud in hole., sl~ort trip to csg x 245' tight hole, wash'x ream 8225-.'8470', short trip to csg >.' hole in good shape, circ btms dp x clean hole for coring, sli,g pipe x'.drop survey, TO x PU Core bbl, TI, wash x ream '8410-8470', 12"' fill o.n. btm. Core' fm 8470-8494',. slug pipe x TO, LD.core, .recovered 21-1/4'. core- sand x btm .4" conglo,~era'te, core bbl jamme'd, TI for 2nd core run, core.. fm 8494-8500', slowed" to less than 5 fph x'TO, recovercd 5' core, conglomerate, stnd back core bbl, .I'U B~A., slip ×'cut'drlg line. 'TI x 8470', 'wash x ream 8470-8500', drl to 8'599', slug pipe x drop survey, trip for.b.'it x retrieve sur. vey, drl to '8658'., tr'l.p for b'it, wash 8648-8658", drlg. A2~CHC, Bb C,E AREA CP. 18742 PAGE. 15 WELL 26 11-30-76 12-1-76 .Granite Point 18742 Well No. 26 Inc. TD 8853', attempt to free stuck pipe, 171, coal-sn, 42. Mud 8.7, 46~ 8.7, 9, '13, 14, 4/13, 2.7, 250, Tr. 2/32, , 20, .15, 10,.0, desander x desilter off. PP 1000,' 294, 32, 154, 6x8x50, 6x8x50. Bit 32, F-2, 3-12, Inc, ].70' Inc , · BIIA bit, 8-1/2" stab 4.60 x 6-.7/16 x 2-1/4, mon.el DC 29.70.x 6-1/4 x 2-7/8,' 8-1/2 non-mag stab 4..40 x 6-i/4 x 227/8, monel DC 29.80 x 6-1/4'x 2-7/8, XO 1.30 x 6-3/16 x 2-7/8, 8-1/2 stab' 4.70 x 6-3/8 x'. 2-7/8, 6 steel DC 186.20 x 6-1/4 x 2-7/8, XO 1.90 x 6-3/8 x 2-15/16,' Dailey'jars 33.50 x.6-1/4 x 2-1/4, 22 jts IIWDP 673.J9. x 5'x 3, 210,'000~t. Drlg 16.-3/4,.. tr.ip 1-1/2, other '5-3/4. Mud cost $2168, $114 057 'f ..- ~'~ , · ..~./,.~ A?. /.o~'..,' ,~ ' .- ~,--~r~-.~ Drl, pass collars x 8770', drl to 8820' , bef;'an--to.si-n.g-~.:et...u-r-ns. . 'x reduced pmp speed x holding ok, short trip x.tight 8820-8500'. Add nut plug x drl, pa'ss, collars, everY 15'. Drl to 8853', pipe torqued up, attempt to PU x pipe st. uck x 8853'. ' Jar x attempt to free stuck' pipe, spot 30 bbls lubriclean x 1.8 ppb, let soak.x jar, 'circ. x jar' x unable to free pipe. ,, Gr'anite Point 18742 Well 'N°. 26 .Inc. (PDC Rig 152, Imco, 7unoco 25PC) Total cost to. date $i,196,000.. ... TD 8853', fishing, 0, , 4.3,. 10,500. }iud 8.7, 46, 8.5, 9.5, 12, 12, 3/18., 2.7, 250, Tr, 0. .. 2/32, 175, 19, 15, 10~ .0,. desander x'desilter Blbi screw-in sub 1.16, bumper jars.9..05, oil jars 7.50, XO .80,.10 steel DC 311.65, XO. 1.90, accelerator j..ars 12.63, 22 j.ts HwDP 6.73.39. Fishing 24.. ' ' Mud cost $748,' $114,805' Circ x jar stuck pipe. Rem'ove goose neck, RU x"run Dialog free-point. Found top collar free, 2nd'collar stuck, free x 8'622'. Install .goose neck x spot 20 'bbls pi.pe-lax aroul~d BI.L~, rdn string shot 'x back off X 8622'. TO x rec all HWDP x 1 steel DC x I)ailey jars. LD jars x steel DC, PU .fishing assembly x TI. 'PU Kelly x.screw into fish x 8622'. Jar on fish x jar began to nialfun, ction, RU Dialog x run free- point. f%NCIIOP~A(;]; A..d;,A 3P. ].87z:2 WELL 26 PAGE 16 12-2-76 12-3-76 Granite Point ].8.742 Well No. 26 Inc. TD 8853' fishing 44 days · , , , , · biud 8.7, 48, 8, 9.5, 12, 13, 3/20, 2.7, B'0'00, 0, 0.' .' 2/32, , 18, 15, 10, 0, desander x desilter down. PP 600, 352, , 187, 6xSx60, 6x8x60"' Bib% same. Fishing 24.. blud cost $686, $115,491. Run free-pOint, found .top 4 DC free to 8746'. Run string shot x back off x 8746', . TO ~.. fish, LD fish x rec four 6-1/4" DC. 'ri x 2000' , cut' drlg' line, finish TI '.screw int~ fish x 8746' x'jar, press DP to 3500 psi x could not circ x no .bleed in 10 rain, jar on fish x no movement. RUx run free-point x.string shot, pipe free below 8783' x back off below top stabilizer, jar x'wor~ fish up.hole 20' circ x , cond.hole x free'circ, rec much small'coal over shaker. TO x fish x work thru tight .' spot x 84.82'. Granite Point 18742. We.]'.i"No..26 Inc. TD'8853', run string shot, , , 45.' " Mud 8.7, 47,. 7.8, 9, 12, 13, 4/21, 2.7, 35.0, 20, O. .2/32, 175, 18, 16., 10, 0,. desander x desilter off. PP 600, 353, , 187, 6x8x60, 6X8x60. " Bib% same. Fishing 24. Mud cost $1230~ $1i6,72]..,. Finish TO .x fish x rec one 6-1'/4"'steel. DC,'one 8-1/2" E-Z change stab, one XO sub. Top fish x 8783'.. TI x fishing BI-lA., jar on fish, press to' 3000 'psi to break'cir'c x no bleed, jar on.. fisl~. Run Dialog sinker. bar x wireline jars', to 'check fill inside fish, found fill x 8790'. Run string sho.t x attempt back off. x '8783' circ btms','up, TO x fishing BI{A ],eft otto 6-1/4" DC x oil . ', ' · ']Jrs'x.bumper jars 'in'hol.e. Broke x dope' all DC x'T1.. Screw in~o f.ish,.RU Dialog x TI x wirel.ine jars x sinker bar x tag fJ. ll itlsido x 8803'". l{u~l string shot t6 .back off x 8783'. ANCltOI'Af:E AREA GP. 18742 WELL 26 PAGE 17 12-7-7.6 Ci'a,~-itt: Point 18742 Wull No. 26 'l.~c. "" 0 (3 days) cmt:-coal 48 TD 8691', dl.J.t, orr plug, , , . Mud 8..8, 43, 8.5, 1~, 9, 8, 2/16, 3.4, 500, 'l.'r, O. ~ ' = 17 0 desilter 8 8, 9 5, 10, desander 8 8, 10 3, 3 2/32, 175, =3, 1.>, , , ..... PP 1050, 235, 33, 122, 6xSx80. Bit 24R, 8-1/2, X1G, open, 8783, ream 383'. .. Bit 33, 8-1/2, ~3A, 12'12-0, Inc, 16, 7-'1/4, 2.2, 0-2, 150, dress x kick 'of.f plug. B~ bit, bit sub 3.58. x 6-1/4 x 3-1/2, 2 monel DC 52.26 x 6 x 2-13/16," 8-1/2" non-mag s'tab 5...02.x 6-1/8 x.2-15/16, 6 steel DC '186.59 x 6-1/4 x 2-7/8, XO 1.91 x 6-3/8 x 2-15/16, DailCy.jars'33.56 x 6--1/8 X 2-1/4,..22 its II~)P 673.39 x 5 x 3. Drlg 8, trip 13, circ 1-1/}, fishing.24, cmt'2, WOC 20, other 3-1/2. Mud ~ost'$2090, $1972,' $478; $121,263. 'Back-off x 8783', TO x fishing assy x'pu bit, TI x ten 6-1/4" DC x oil x bumper'jars to 8400' Wash x ream 8400-8783' · . , .no problems, circ x cond lhole, TO, PU 2 jts wash pipe x rotary.shoe, TI, wash x ream 8754-8783', wa. sl~. over to 8792' x tight x jarred,, washed 9' over top of fish, torqued up x pdcked off x press incr, PU to free pipe x could not get back over fish/ TO x LD wash pipe, oil x.bumper jars, PU 27 j ts DP x TI to '87.8'0'. Circ, mix'x prop '75 sx Class G + .75% CFR-2, 10% 10-2.0 sn, mixed 16'.4 ppg. Pull 5 studs x rev out .x no. cmt returns. CIP 1800 hrs, 12-4-76. TO x WOC PU..Blh% x TI to 8367' x hit bridge, wasll x ream, spotty bridges 'to 8600' much coal over .shaker. Drl cmt x cOal.to 8675', plug probably, contaminated x coal, · top x 8600' hard x 8675' , .. Drl x .forming shoulder to get off plug. Granite Point' 18742 Well No. 26 Inc. TD 8724' drlg 33 sn 49.' '" MUd 8.8i 55 7 5, 12 15 "15 6/38, 3 4 550., Tr .0' " 2/32, , 18, 16, 16, 0, desi.lter 8.'8, 9.8, 12, desander off. PP'155~0, 294, 34, 156, 6x'8x50,'6xBx50.' .Bit ~3, 8-1/2, ~3A, .0-12-12,' 8698, 23, 14-1/2, 1.5, 0-2; 150,"6-.6-I, ,, dress x kick off. plug. ' Bit 34, 8-1/2, SDCJl, 0-12-12, Inc, 26, 7, 3.7, 2-5, 150, Inc. Survey 8682, '20, N62W. , . BIIA" t;;]me, 202,0001/'. "' lJrlg .1.4, I:l.'il~ 6~ ~:V~.')' .I.~ c.i. rc..I,~ ~t.ll~.~r 2. Mud cos~ ~2296, ~21.23,559. DrZ ~o ~orm shoulder on k~ck plug, survey, TO x re~rZeve survey~ cut clrlg i2t'te~ TI~ wash x ream 8561-8698'~ hard ream2ng~ cSrc~ shorg rr&p, drzg; ANCHORA{:E AREA GP. 18742 WELL 26 PAGE 18 12-8-76 12-9,76 Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC) Total cost to date $1,367,000. TD 8864', trip, 140, sn-sh-coal, 50, 10,500. Mud 8.8, 49, 7.8, 12, 13, 13, 3/30, 3.4, 600, Tr, O. 2/32, 175, 19, 15, 16, 0,' desilter 8.8, 9.7, 15, desander off... PP 2100, 300, 35~ 156, 6x8x56, 6x8x56. Bit.34, 8-1/2, SDGH, 12-12-0,. 8738, 40, 11-1/2, 3.5, 3-5, 150, 7-6-1. Bit 35, 8-1/2, SDGH, 12-12-0, 8864, 126, 9-1/4~ 13.6, 15-30, 150, 5-7-1. Bit 36, 8-1/'2, F2, 12~12-B, Inc. Survey 8723, 19, N62W; 8850, 14-1/2, N58W. BHA bi't, bit sub, monel DC, 8-1/2" non-mag stab, monel DC, '8-1/2'.' stab, 6. steel DC, XO., Dailey jars, 2'2 jts 1.1WDP, 202,000f~. Drlg'13-3/4, triP 7-3/4,' survey 1, other 1-1/2. Drl, drop survey x prop dry job, TO x'LD 25. jts DP, finish TO, cha. nge BHA x TI., wash x ream 8600-8738', drl. Drl coal '8787-'8823',. work pipe x pass .collars every 5' connection .x 8827' tight, PU 10' x pull 370M, jar..x work pipe free, work x ream through coal, drl 5' x work pipe x tight. 8790-8830".. Mix x prop 30 bbl' pill., of 12 ppg mud x continue drlg unt. il pill. on btm, PU x work pipe x press incr 1950-2250 psi x pi].l at .collars, work p:Lpe x hole slick. .Rec moch small coal over 'shakers, drl to 8864' drop survey x prop dry job, TO x retrieve survey x. trip 'good. Granite Point 18742 Well No. 26 Inc. TD 9010' drlg 146 Sh-sn, 51 , , . , · Mud 8.8, '54, 7,.'10.'5, 15, 1.5, 3/14, 3.6, 500, 10, 0. 2/32, 175, '18, 1'3.6, 19.2.5, 0', desiit'er 8.9, 9.6, 15, desander off. PP 2100, 329, 36, 175, '6x8x56, 6x8x56. Bit 36, 8-1/2, F2, 12-12-0,. Inc, 146, '18-1/2, 7 9., 30, 60, Inc, Survey 893"0, 14, NC. Bl-bi bit, 8-1/2" stab, 2 steel DC, 8-1/2" .stab, 1 ~te'el DC,. 8-.1./.2" stab, 5 steel DC, XO, Dailey jars, 22 jts'.IIwDP, 206,000fJ. Drlg 18-1/2, 'trip 3-3/.4, .rig. rep i-1/4, other 1/2. Mud cost $3273, $127,8'33. Finish TO, worli, on degasser,, change. BI1A x TI, CO bridge x. 8801', '35' fill on btm, drl,.'survey x 8930' short trip 11 stnds x no tigl~t spots Drl 8-.1/2" hole to 9010'. /~ CHO P~A ~.E AREA' (;P. ].8742 WELL. 26 PAGE 19 12-10-76 Granite Point 18742 Well No. 26 ]nc. TD 9124', jar stuck pipe, 114, coal, 52. Mud 8.8, 44, 7, 9, 12, 13, 3/8, 3.4, 400,.Tr, 0. 2/32, , 18, 15, 15, 0, desilter 8.8+, 10.8, 12, desander dwn. PP 2100, 329, 36, 155, 6xSx56, 6x8x56. Bit'36, 8-1/2, F2, 0-12-12, Inc,. 260, 3'0-3/4, 8.5, 40, 60, Inc. ~BIh~ bit, 8-1/2" stab 3.75 x 6.-7/16 x 2-3/8, 2 steel DC.62.55 x 6-1/4 x 2-7/8, 8-1/2"' stab 4.70 x 6-3/8 x. 2-3/8, steel' DC 31,22 x 6-1/~ x 2-7/8, '8-1/2" stab, 4.25 x 6-1/2 X 2-3/8, 5'steel DC 155.37 x 6-1/4 x 2-7/8, XO 1.91 x 6-3/8 x 2-15/16, Dailey jars 33.56 x 6-1/8 x 2-1/4, 22 .jts 1FWDP 673.39 x 5 x 3, 210,000fi. Drlg 12-1/4, trip 1, survey 1/2,. other 10-1/4. Mud cost $3825, ~$131,.658. Drl, drop .survey x pull' 13 studs, retrieve survey, TI x wash x ream to' .. btm, drl, drl coal 9106-91].0',. work pipe x pass collars, drl 9110- 9114' x slow drlg, wash x ream x work pipe, make ~onnection x drl 'to 9123', work pipe x pipe stuck on btm. .Jar x ~n.~able to free stuck pipe. }iix x prop 30 bbl Pill 12 ppg mud x press incr 1950-2600 psi as pill came around, circ. pill out.x rec much small coal over shaker. Mix x prop 20 bbl.14' ppg mud x press incr 1950~2200 psi, .continue jar x pip. e stuck.~ mix X prop 30 bbI 14 ppg mud, press :[.ncr 1950-2200 ps'i, mix x.pmp 20 bbl 14 ppg mud x press incr 1950-2200 psi, circ btms up x.no more coal over shakers. Continue jar stu'Ck.p.ipe X gain 1'. ANCHOILACl;; AREA GP. i8742 WELL 26 PAGE-'20 12-13-76 Granite Point 18742 Well No. 26 Inc. TD 9256' drlg, 0-0-132, sn-sh-coal, 55 , · Mud 8.'7, 44,. 8.6, 9.5, 12, 12, 3/15, 3, 350, 20, 0. 2/32, 175, 20, 16.25, 13.75, 0, desander 9, 12, 2, desilter 8.8, 9.9, 12. PP 1400, 32.3, 37R, 171, 6x8x55, 6xSx55. Bit 37, 8-1/2, SDGH, open, 9080, wash x ream tO fish. Bit 36, 8-1/2, F2, 12-12-0, 9124, 260,. 30-3/4, 8.5, 30-40, 40-50, '2-3-I, out x.fish. Bit 37R, 8-1/2, SDGI~,' 3-i2, Inc, 132, 6', 22, 40, 120, Inc. ., BRA bit, bit sub, six 6-1/4" steel.DC, 'XO, 2 jts IIWDP, .Dailey jars, 20. its HWDP, 210,000#. Drlg 6,' trip 26, lost circ 5-3/4, circ 8, fishing 11-1/4, other 15. Mud costs'S3987, '$3068, $1648; $140,362. Circ x jar stuck pipe x 9124'. RU x run free,point to 9115' x'free'to near bit. stab x no stuck' point found. Mix x pmp vis pill x.hold five roun'ds torque, no press incr around bit, mix x pmp 16 ppg pill' x press incr 2600-3100 around bit, rec many large cliunks coal. over shaker. RU x run.string shot x back off x 9091' left bit, stab, one 6-1./4".DC . ' in hole. TO'x 52 stnds x first 3 stnds tight. Lost circ x could not fill hole x 57 bbls mud x TI to 8000'. Mix x spot three kwik-Seal 'pilis x .regain'circ after pmp 450 bbls.. Watch FL in hole x ok. Pull 5 'stnds DP, circ .x 7791' x. full returns, close.Hydril x press fm tO '250 psi x no bleed. TO',' change B]LA x TI x 8786'. Wash x.ream numerous bridges to top of ~fish. Circ x cond mud, sho'rt trip x lst'stnd tight.', circ'btms.up,. TO x.PU,fishing assy x TI, Screw into fisl% x 9079;, 'jar . pipe. x fish free. 'TO' x. fish x LD fish x too'is. Tst rams. x'manifold x '3000 psi x Hydril x 1500 psi, .o.k~ PU Bl-b% x. TI, wash x ream 9000-9124' mix x prop 20'bbl.Vis Pill, 'work pipe x cond hole, press inCr 40.0'psi .x pill around bit, .rec much small coal over shaker,'drl to 9256'. Granite Point 18742' Well No.'~6 Inc. " TD 9379', drlg, 123, '.sn-sh-c~al, 56, Mud 8.8, 43, 8.2, .9, 10, 12, 3/13, 3.4, 300., Tr, 0. .2/32, 175, .21, 13.75,. 18.25, 0, desander, desilter. ' PP ].450, 312, 38, 162, 6x8x53, '6xSx53. Bit 37R, 8-.1./2, ~I)GII, 3-].2, 9293, 169, 8-]/4, 20.4, 40, i20, 4-5-i.. Blt 38, .~-.I./2, Jil'.l, .1'2-12-9, .l. llC, ~t0, '1'2-]./2, 6.9, .4(), 50,' .[iii.:. ,~;~,,'ve.y 9367, 10--.i./2, NC. BIIA same, string wt 2]0,000#. D'rlg 14-3/4, .trip 6-3/4, rig rep 1, survey 1/2, Other 1. Mud c'ost $3319, $].43,681. Drlg 8-1/2" hole.x drop surw.,.y x 9293', ,li;.;run. TO x ~;.l~a~.l;c bits x cut' drlg line x TI x.wash bridge 9140-9150" x wash x'ream to btm.' Drlg 9293-9379' . ANCtlORAGE AREA GP. 18742 WELL 26 PAGE 21 12-15-76 12-16=76 12-17-76. Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, imco, Amoco Total cost to date $1,486,000. TD 9547', drlg, 168, sh-sn-coal, 57, 10,500. Mud 8'.8, 47, 7.5, 9, ].6, ].5, 4/18, 3.4, 300, 20, 0.' 2/32, 175, 19, 16.25, 15.75, 0, desilter 8.8, 9.5, 12, desander off. PP 1450,' 312, 38, 162, 6x8x53, 6x8x53. Bit 38, .8-1/2, J33, 12-12-9, Inc, 254, 33, 7.7., 40-45, 50, Inc. 'Survey 9367, 10-1/2,. NC. BIIA same, 212,000//. Drlg 20-1/2, trip 2-1/4, survey 1, other Mud cost $2087, $145,'769. .Drop survey, short trip 16 stnds'to 9-5/8" shoe x hole good, retrieve survey, TI x wash 10' fill to btm, drl to 9450', short trip 16 stnds x tighg 1 stnd off btm, pull to 350,000~! x work pipe, wash 85' bacl~ t-o btm, drlg. Gra"nite Point 18742 Well No. 26 .'inc. TD 9790', drlg, 243, sh-sn-coal, 58. Mud 8.8', 44, 7.8, 8.5, 12, 12., '3/.13, 3.4, 300, 20, 0. 2/'32, .175, '19, 15, 17, 0, desilter 8.8, 9.6, 10, desander 8.9, .12., 2. PP 1450, 312, 38, 162, 6xSx53, 6xSx53. Bit 38, 8-1/2, J33, 12-12'-9, Inc, 497, 50-1/2, 9.8, 45, '50, Inc. Suryeys 9584, 7-3/4, NC; 9740, 1-1/2, NC. Blbt' same, 216,000~J. Drlg 17-1/2, trip 3, sur, vey 2, circ'l-1/2. Mud cost $1471,. $147,240. Drl, drop .survey, short t'rip .18 stnds x 9597' x tight x 9344', retrieve survey, TI., drl to 9762', circ x drop survey,, short t.rip 20'.stnds.'x tight x 9.344', drlg.. . Granite Point.1874'2 Well No. 26 Inc TD 9892.', circ, 102, sn-sh-coal, 59; Mud 8.8, 42, 8.2, 9.5,..12, 12, 4/16'; 3.4, 35'0, Tr, 0.. ' . 2/32, 175, 19, 15, 17, 0, desilter 8.8,.9..4, 10, desander off '' PP 2000, 312, 39, 162, 6x8x53,.6xSx53. ' Bit 38, 8-1/2, 'J33, 12-12-9, 9843, 550 58-1/4, 9 4, '45, 60, 2-4-'I, lost 3 inserts. Bi't 39, 8-.I./2,' J'33,' 0-].2-12, 'Inc, /ii) " ' , 6-],/2 7 5 /~5 ' BIIA ,';;'~me, 2.1.8,()()()//.. , , · , , 50, . Drlg 14-1/4, trip 5-3/4, rig rep 1, survey 1/2, circ 2, other 1/2 % ~ , ' . M,d cost $].2'~9, .$]..~8 489. Drl,. circ x surVey,. 'I.'0 x retrieve survey x survey no good,, crt drlg line,. Ti[, w.'..~:fl~ x 'reml~ 7()' t:o l~tm, br,i~lge.x 9773-979()' <,ltl x break x 98fi7-92' , , , circ 'x rec much coal over shaker.. ANCIt ORA(;I': GP. 18742 WELL 26 PAGE 22 12~20-76 12-21-76 .Granite Point 18742 Well No. 26 Inc. TD' 10,344', lost circ, 198-150-104,. sn-sh, 62. Mud 8.7, 50, 9.4, 8.5, 1.3, 16, 8/28, 2.7, 300, 60, O. 2/32, 175, 29, 15, 10, O, desilter x desander off.. PP 2100, 312, 39, 162, 6x8x53, 6x8x53. ' " Bit'39, 8-1/2., J33, 2-12, i-B, Inc, 501, 55, 9.1, 45., 50, Inc. B~L~ same, 224,000~). " Drlg 49.-1/2, Trip 9, ..survey 2, lost circ 6, circ 2-3/4, other 2-3/4. .Mud cost $2102-$2720-$2148, $155,46i. Drlg x circ, short trip 21 stds.. TI. Wash x ream 10' to btm, dr!g. Circ x work pipe thru coal break, drlg. Survey, power failure. Drlg, drop survey, pull 21 stds,', retrieve survey x TI, drlg. Short trip 10 stds, tight at 10,100'. Wash x ream 10' to b~m. Drlg, short trip, tight 'at 10,100', CO bridge at 10,136:10,166'. x 10' of fill on btm. Drig @ '10,344' x lost circ. TO to 7840' x'build'volUme. Prop 20 bbi.s for'DP disp while pulling up to 9-5/8". shoe. Mix 50 bbl Pill x'24 pPb'fine x medium Kwik-Seal. TI to 8208'. Disp' to bit, pressure indrea, sed from 0 to 1000 psi after pumping 103 bbls, returns at surface x 119 'bbls. Pmp 146. bbls, pill in place at 0245. Wait 15 rain .x fill hole on back side x.i9 bbls, level dropping slowl'y. Wait 7 rain x prop 26 bbls but hole would not fill. Mix 35 bbl pill x 53 PPb fine × reed Kwik-Seal . fine nut plug'. 'Pmp x disp x 138 bbl's, started getting returns at surface. Finish disp DP x 8. bbls mu'd level, in annulus still fell slowly.' Pill. in place at. 0600. Mix pill No. 3. Granite Point 18742 Well No'. 26 inc. ' TD 10,344', circ x 9035' 63 Mud 8'7,. '51, 12, 9,-12, 14, 2/2 , .2.7, .250; 20, 0. 2/32, 175, 33, 17, 7, 0, desander x'desilter down. . 55 9 1 45 50 2-5-1 Bit 39, 8-1/2, J33, 3-12~ 10,344, 501, , · , , , .. Bit 36R, 8-1/'2, .F2, open, Inc. B~L~ same, 228,000f). Mud cost $11,..068, $166,529. Wait on LC pill ~3, .fill annulus x ].3 bbls, SD proP, prop 22 bbls x could not 'fill annulos. Mix x. prop 57 bbls LCM x 34 ppb x disp x returns after prop 105 bills, d:i..sp additional 41 bbl,,~.x let set, fi. ll annul.u,,-~ x 42 bbls, TO x clla~{~e bit:.;, 'TI x ~'~. jet:~ t.o 8945' , M.i.x :.1.~8 bl~.{, i,(',M i~:i..}.l 'I/4, 60 bbls to fill Di." .x.pr :Lncr to 250 psi,' f:Lnish l,mp pill x no re~'utn~. .'. Pr incr to 450 psi x l0 bb'ls'disp,, returns x 39 bbls. Disp pill x 126 bbls, left 33 bbls inside'x ].55' bbls outside. PU to 8000" x W0 plug, fill annulus x 19 bbls x itole stayed full. Close llydrii x sq. x would not pr up but hole stayed full, WO pill.. Close llyclril x pr up to 200 psi, bled' to 25 psi in 5 min, TI to 9035', circ x 37 SPM x 350 psi x 'no l'osses. . . /~,l CHORACE AREA GP. 18742 WELL 26 PAGE 23 12'22-76 Granite Poi~t 18742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC) Total cost to date $1, 574 ~ 000. TD 10,344','build mud.volume, ,., 64,~ 10,500. Mud 8.6, 40, 10, 8.5, 9, 11, 3/].8, 2.5, 200, Tr, 0. 2/32, ~175, 26, 16.25., 6.75, 0, desander x desilter down. Bit 36R, 8-1/2, F2, open, Inc-. lost circ. BHA same. Lost' circ 22, other 2. Mud costs $6091, $172,621. Circ x bit x 9035',' 37 SPM x 350 psi, TI to 9344' x hit bridge, wash x ream 9344-9352' x broke thru.bridge, lost returns. Mix x pmp 69 bbl pill x 30'.ppb med nut plug, 26 ppb f x m Kwik-Seal, spot pill x 9352'. PU. 4 its to 9252' 'x fill hole x 25 bbls mud, .lost 28 bbls. in 4-3/4 hrs, ci~c x 9252', 37 SPM x 500 psi, press decr to 350 psi x lo. st returns. Mix x spot 50 bbl pill x 30 ppb nut p. lug, 26 ppb f x m Kwik-Seal, returns. Mix 50 bbl pill x 25 ppb fine Kwik-Seal, 25 ppb med. Kwik-Seal, TI to. 10,050', hole good except for~ledge x 9350' x slipped p'ast, spOt pill x 10,050' x PU to' 7932', est losing 20 BPH.. TI to 10',060' x' hit fill, Wash g.ream 10,060-10,080', partial returns x 37 SPM x .400 psi, make' connection x 10,080' x lost returns. Wash x ream 10,080-10,].06' no returns, fill. hard, lost 240 bbls while wash x ream. Mix x spot 60 bbi pill x 10 ppb coarse Kwik-Seal, PU to 79.32' x build mud volume, hole good. . '. ANCHORAGE °AREA GP. 18742 WELL 26 PAGE 24 · , 12-28-76 Granite Point 18742 Well No. 26 Inc. TD 10,344' PBD 10 336' TI x 7" pkr, - 70 Mud 8.7, 37, 27, 11.5, 7., 8, 7/10, 2.7, 20 , Tr, O. 3/32, 175, 62, 15', 10, 0, cyclones off. Bit 40, 8-1/2, X1G, open- condition hole. Bit 4'1, 6", OWV, open - clean out 7" liner x drl cmt. Dri cmt 5, trip 45-3/4, circ 13-'1/4, csg/cmt 14-1/.2, WOC' 10, evaluation 28-1/2, lost circ 8-1/4, other 18-3/4. Mud cost $6540, $4576, $5426, $2476, $1618, $641; $193,902. 7" liner set 7728-10,336' 12-26-76 , Build mud volume x TI to. 9221', circ x partial returns. TI to 9865' x fill hole. Circ x partial returns.. TO x change bits x TI to ].0,050'. Wash x ream' 10,050-10,106', partial, returns. Stuck x 10,106' 'x jarred loose.. Wash x ream to 10,.344' hard fill. Lost 700 bbls mud while Washing to btm. Spot 50 bbl pill.x 20 ppb Kwik-Seal, short trip to 8000'. TI .to 10,344' x condition hole t~ log x TO. Run .1ES, GR-Sonic, GRvDensity x'Dipmeter logs 10,336-8000' ' 1ES paneI failed x reran x hit bridge x 8820'. .TI x wash bridges x 8852-8864', 9312-9400' x fill 10,068- 10,344'.. Est losing 1/3 of returns. Spot 50 bbl LC~i pill on-btm, short trip, 'circ x TO. Run 1ES x stop x 10,200' x TI to condition hole' for csg. Spot 50 bbl LCM pill x TO'x DP Run 2588' of'7" 26f~ N-80. Buttress liner x..BOT hanger. Land csg x 10,336'. x' top x 7728~. Set hanger x cmt x 500'sx Class G + 1/4f~/SX Flocele + .75% ltala~-9. + 0.5% CFR-2, preblended x pix x 5.2. gal fresh wtr per sx, avg ~13.5 ppg 1st 250 sx, rdplaced cemen.ter x prop 250 sx avg'15.8 ppg. Z' Mix 85 sx neat Class G x 15 ppg, unable to get even 15.8 ppg. Disp x 215 bbls mu~ x did .not bump PlUg. "CII~ 0325, 12-26-76, good returns throughout job, est lost 30-40 bbls while running x cmt liner. Pull 2 stands x reverse, rec 10 bbls cmt-contaminated mud. TO x setting tool'x WOC 10 h~s. LD 6-1/4" collars, jars x slip~'x cut drlg line. Make '8-1/2" bit x 9-5/8": csg scraper x TI' tO liner top .x 7728', no cmt. Circ btms up x TO. PU 6" bit X 7" .scraper x 4-3/4" DC x 3-1/2" DP x TI to liner top. Tag cmt x ~946' x drl cmt 9946-10,080' 'void from 10,080-10,234' x drl cmt 10,234-10,2~3'. .. , plng x 10,243', cmt to 10,336' x drl Sl~oe x 10,336'. Circ x '1.'0.. 'Rm~ SWS CBI.,-GI~-C{.',L 10,3J.8-7700'. Run East. mall' gyrO survey 10,3 ~' '' . ' .1. o-8.1.00'. Set lip x. 9175' install 3-I/2'~ pipe rm~s x PU x Ti x 7" RTTS pkr. Grot top per b'ond log at 8800'. Good bond below 9050' fair to good 9050' to 8'800' little or no bond above' 8800'. ANC~II) RA('.I'] GP. 18742 WELL 26 PAGE 25 12-29-76 12-30-76 · Granite Point ].8742 Well No. 26 Inc. (Parker Rig i52., Ire'co, Amoco 25%) Total cost to date $1,780,000. TD i0,346'4g trip 2, shale, 71, 10,500. blud 8.7, , 16.~, 11.5, 8, 11, 6/15, 2.7, 200, Tr, 0..' 3/32, 175, 4'7, 12.5., 1.2.5, 0, cyclones off. PP 900, 220, 42, 402, 6x8x75. Bit 42, 6" O~f 3-11, 10 346, drl retainer + 2" sh, 7-5-I. BItA bit, boot basket, .bit sub, eight 4-3/4" DC, 3-1/2'! x 5" DP, i68,000~. Drig 7-1/2, trip 8, circ 1'/2, tst liner 8. ' Mud cost $838, $i94,740. '" TI x 7" 'R'rTS.pkr x set'x 7779' RU SWS .x pf 7" x 8778-80' 4SPF "Tst pfs , to 2500 psi x ok x release press x press liner lap'x annulus x. 1500 psi, ok. Release press x tst pfs to 4000 psi x bled x took 3 bbls in 5 min .x held. Release DP press X press liner lap x annulus to 3000 psi, held · ok x no bleed. Release RTTS x TO'x pick up 6" 'bit x boot basket x TI. Drl EZ drill retainer x 9175' x push to btm x drl 2" new 6" hole. Circ x s. lug pipe x TO for new bit. Granite Point 18742 Well No. 26 Inc. TD 10,3.75' drlg "29 sn-sh 72. ' , , , Mud 8.7, 54, '9.'8, il, 15, 13, 5/28, .2.7, 250, Tr, O. , '2/32, i75., 23, 12.5, 12.5, O, off. PP 1650, 220, 44, 102, 6x8x75. " Bit 43, 6" W7R2, 3-11, 10,353' 7, 6-i/4 1, 8-10 50 6-5-i drl junk .' , . , , , , 0. .Bit 44, 6" .J33 2-11 lB, Inc 22-~ 6, 3 6', 20-22, 50,..Inc, , , , , BHA bit, bit sub 19 4-3/4"'DC,' Dailey jars~ six 4-3/4" DC, 3-1/J" DP, DP, . . , .' 5.! I string wt 200,00.0i[. Drlg 12-1/4, trip 11-'3/4. ' " Mud cost $3228, $197,968. Finish T:I x drl junk + 7' new hole. TO x change'.bits, x PU 17 DC's x jars x TI x drlg 6" hole to 10,375'. ANCHORAGE AREA GP. 18742 WELL 26 PAGE 26 1-4-77 ¢:ranitli Point 18742 Well No. 26 I. nc. TI) 1.0,683, drlg, 178-38-0-92, sn-sh-coa.1., 76. Mud 8.8, 53, 7.8, 10, .16, 14, 3/12, 3.4, 350, Tr, 0. 2/32, 175, 19, 15, 17, O, desil.t 8.8, 9.4, lO,'desand'8.9, 10.6,· 2. 'PP 1800, 220, 45, 101, 6x8x'75'. Bit 44, 6, J-33, 2-].1, l-B, 10,591, 238,.30-3/4, 7.7, 25, 60, 5-4-1. 45, 6~ J-33, 2-11, l-B, Reaming. '46, 6, OWV, 3-2.1, 10,604, 13, 2-1/4, .5.8, 10-20, 100-120',' 4-S-1., Ream 10,370-10., 59i. 45RR, 6,.J-33, '2-11, i-B, 'Inc, 79, '10,. 7.9, 24, '6.0, Inc. . .BilA same. Drlg 37, .Trip 30-1/4, Rep 1/2, circ 6, other 22-1/4 Mud cost $894-$1153-$].249-.$1223, $202,488. .Drlg, circ to rec samples after drlg'break., dr, lg, circ dr!g break at 10,516', short trip, drlg. Circ x TO, PU 'DST .tools x TI. Set RTTS pkr at 10,302', tail at 10,319', Open tool, 5 rain, weak blow, 'incr .to medium blow. SI. f'or 30 min. Open, weak' blow inc. to good bl'ow, no gas x no pressure. Tool open. for 3 hfs, SI for 6 l~r's for FSIP. Rev out 10 bbls mud, no gas or hydrocarbons, DST Pressures II-IP' 4529 IFI' 219 1SI 421. ' " ].1~2 238 FF2' 275 · FSI 641' .. FHP.4548 ~ 162°F, 2.0,289' . .' Re].ease pkr'at 0605 hrs. TO x I),MT fi.l, I.,1) tst tools,, rec 19 gal S(;Cbl. '£'I x [)it 45, ream t-i.ght ho].e 10,370-.1.0,460'.. .I. or lui. nl;" ~ and packing off. Tri. p for. mill tooth bit. .Ream J. 0,370-i0,470, tight x .p.ackin.g off., circ. Ream 10,470-J. 0,520'.. Ream to 10,591, drlg, .. sltort trip, wash x rea,/ 3.5' to btm. (.:.irc', .t~.-ip for bit, d.rlg.. '. .Gl;a~lita ].k~int .18742 WcJ.i No. zO TI) 10,841' trip 158' coai-s'll 77 }iud 8.8, 54, 8,"10, 19, 14,. 3/15, 3.4, 35.0, Tr, O. 2/32, 175, 19, i5,. 17, 0, desilter' 8.8', 9.4, 10, desander off. PP 1800,. 220, 45R, 101, 6xSx75. Bit' 45R, 6" J33 0-11-11 Inc, 237, 27-1/2, 8 3, 24, 60, Inc- TO , , , · * BIIA same, 212,00011. Drlg 18-1/2, trip 3, circ 2-1/2. 0 Mud cost $2427, .$205,015. Drl, short .trip t° 7" csg,. drl., short trip to 7", drl to'10,841' x bit t~rqued, circ, TO to PU core barr'e.1. ^NCIlORACI'~ AREA GP. 18742 WELL 26 PAGE 27 1-6-77 .1-7-77 Granite Point 18742 Well No. 26 Inc. (PDC Rig i52, Imco, Amoco 25PC) Total cost to date $1,929,000. TD i0,860' cond hole, 19, sn-sh, 78, 10,500. , Mud 8.8, 52, 7.6, 10, 16, 14, 3/5, 3.4,. 300, Tr, 0. ' 2/32, 175, i8, 15.7, 16.3, 0, desilter 8.8, 9, 12, desander off PP 1700,' 235, 47, 112, 6x8xS0. ' Bit 45R, 6" J33 0-11-11 10 841 237 28L1/2 8'3, 24 60,' 4--.5--I. Bit 47 6''' ' ' ' ' ' ' , , .W7R2, 3--11, Inc-CO X cond hole. ' Bl-b~ same, 212,000#. ' Trip .13, circ 2-'1/4, other 8~3/4'. .. Mud cost $2069, $207,084. Finish T0, PU core barrel x TI, hit bridge x 10,651' x. wash x ream 10,651- 10,841'. Drop bail x circ, core 10,841-10,860,' x core barrel.jammed, TO. x.LD core barrel x core, rec 18' shale x sand stringers,' est dip '80-85~.' TI x Bit 47, circ x wash 26" to btm x cond hole .to log. 'Granite Point 18742 Well No. 26 Inc. TD. 10,860.', fiji pits x SW, , , 79. , Trip 5-1/2, circ'.3-1/2, log 6, other 9. " Mud cost· $1647, $'208,731. Circ x pmp vis pill, 'short trip tO 7" csg shoe, 25' fill. Circ x 10,860", short trip to 7" shoe, 2i' fill. Circ btms up x 10,860' x TO. RU SWS .' .x run IES 10,830-10,338', GR-Sonic i0,826-10,336', GR-DensitY 10',660- .. 10,332'. Sonic hung up x 10,725' x drug.10OO#'over w.t, caliper indi- cated 5" x 10,725'. Density'hung 'up x 2-3000#'overpuli at 3 seParate · points, canceile~l Dipmeter. LD 4-3/4" DC x jars x PU 3-1/2" DP x clean pits. 'ri to 10,326' x open ended DP.. Fill pits x SW x prep' tO 'disp' hole x SW. ' .Granite l'oint ].87/~2 Well No. 26 ].nc. 'I'D 10,860.' TI x bit x scraper, , , 80. Bit 4711, 6", W7R2, open, 'l. nc-CO run. BI.IA bit, bit' sub, 7" csg scraper, 3-1./2" DP. 'rrip 5-1/2, c:i. rc J5-]/2, other: 3. .. · ,, ...... , ,,,20ii, 6.'1 I., l:'lii I~.[t.,,~ x ,';c;twl.:~:, ~l.l.,,:p ',n~d x ,';e;Iwtr {~'om .1{I,33{,' l..il.i l,[t~; x . , reverse':~eawtr x disp 'x diese.1 x 1.0,336~. TO x DI~, RU Dres,,:;er X attempt to run 7" E-Z drill I';P,' could not gc.t phst liner top x 7728', . , lid Dresser. 'PU 6" b:[t x 7" csg .scrapor x TI 'to lJ. lier top x 77.28". ~ . l<otate x work ~l~ru. il.:;t time x went tl.~ru 8 more times, did not rotate 'after first pass'. Ti to 10,336' x sc{'aper.. ~ CI-IORAC. I; AIIEA GP. 18742 WELL 26 PAGE 28 1-10-77 1-11-77 1-12-77 · . 1-13-77 1-14-77 Granite Point ].8742 Well No. 26 inc. PBD 10,310' RD perforators RU Dresser-Atlas lubricator,, tst lubricator, failed. RD x rep lubricator. RU same, tst to 2000 psi, ok. 'Perf x Dresser-Atlas 4" Jumbo Jet csg gun, 4JSPF,' 8216-8266' 8270-8296' 8307-8340' 846.9-8589' 8637-8660" 8680- 8744', 8975-9000', 9485-9530', 9540-9795' x 9888-10,045'. Hole .stayed full throughout perf. . Granite Point 18742 Well No. 26 Inc. l, PBD 10,310' TI x' pkr x retrievable BP 7" csg scraper, tag at 10,293' CO tO 10,3.10' RD lubricator,1 TI x 6''l bi't, · ' Circ, .TO x bit x scraper. PU retrievable BP, taillpipe x retrievable pkr x TI on. DP. .' Granite. Point 18742 Well NO. 26 I~!c' (PDC Rig 152, Amoco 25 PC) Total cost to date $2,163,5.51. " 1pBD 10,.310'. Prep tlO run BRA. TI x I}P, pkr, 330' tailpipe x BP. Acidize laSl follows: 'Set BP @ 8368 x pkrl @ 8013. Pres tst p.erfs 8216-60 x 8270-96 x diesel to 1000 psi x bled off l tO 250 psi .in 15 min. Set BP @ 10,100 x pkr...~ 9840 x spot 1.5.70 gal 15% NC1 X' additives over perfs 988'8-10,045. Pres annulus to 250 psi X disp · acid x diesel @ 1.1 BPM x 2100 psiI Set BP @ 9840 x pkr @ 9300 x spot 3000 gal 15% HC1 over. perfs 9485-9745. Pres annulus to · 250 psiXI disp acid x diesell @ 0 6 BPM x 3300 psi Broke back to · l.~ . ' i · '~' 2200 psi ~ 1.1 BPM x 1550 gal HC11 in formation. Set BP @ 9300 x pkr @ 8850.x spot 250 gal l15%.[IC1 over perfs 8475-9000. Pres annulhs to 250 psi x disp x diesel @ 0.7 BPM X 3700 plsi. Set. BP'@ 8850 xlpkr @ 8400 x slpOlt 2070 gal. 15% l]C1 .over perfs '846928744. Pres annulus 'to '250 psi x disp acid x diesel @ 1,.0 BPM x 1500 psi. After 75.0 lgal disp pres d:.'opped to 1200 p,,~l.{, x ann:l].u,:~ increased to 800' psi. Had communication x perfs 182i6-8340.. Rev out remaining acid, retrieved BP 'x TO x pkr, talilpipe x Granite Point 1187/1'12 Well NO.' 261 Inc. Finish TO x pkr x plu~. TI x open-ended 3-1/2" DP.. TO, LD 3-]./2" DP'. RU x run 3'-1/2'' tbg tailpipe. PU Kobe cavity, 3" Type "B." Rig to run dual tbg, 1Run dual tbg, broaching eVery 1000'. 11 I Granite PoJ.~:t 18742 Well N.o. 126 11lC. PBD 10,310' TI x dual 3-1/2'" tbg , ' · I[{ldI trouble broac[:.t~b, tbg. Check 'tally, it{lily w~-o. ng. '.['O1 to cavity. Retally tbg x broach .tbg back in hole. . 1 , . ANCIIORAGE AREA GP. 18742 WELL 26 PAGE 29 1-17-77 1-18L77 1-19-77 1-20.-77 1-21-77 i-24-77 Granite Point ].8742 Well No. 26 Inc. PBD 10,310' hooking up manifold X lines ' . TI x 3-1/2" tbg,. broaching every 1000', space out x 'land same. Blbi btm at 7690' tailpipe at 10,096' ND BOP, NU tree; tst to 5000 psi. Clear tile deck. Prep to skid rig. RREL 0800, 1-15-77. . Granite 'Point 18742 Well No. 26 Inc. PBD 10,3i0'., hooking up lines x Kobe manifold.. Granite Point 18742 Well No.' 26 lnc. (Platform Anna, Amoco.'25PC) Total cost to date $2,284,375. P'BD 10,310', hooking up lines, Granite Point 18742 Well No. 26 Inc. ' . PBD 10,31~~ prep to wireline'out st'ending valve. , Circ down short string, up long string. Drop standing, valve, attempt to' press tst same. Press to 1500 psi, bleeds down in 2 min. 'Unable 'to seat standing ·valve. Granite Point ].8742 Wel.1 NO. 26 Inc. , ' .... PBD 10,310' fishing for standing valve. Run Kobe pmp, would not press bp, prop. out prop, no marks. Fish for standing valve x wireline,, unable to catch. R~n impression block, no print. Run magnet, rec' .fine shavings 0f metal x fine wire. . . . .. Granite Point 18742 Well No. 26 inc. PBD 10,310' .Prop on tst. Fish out standing valve, standing valve, had rubber in it. Ci. rc. Run sinker bar to 7730'. 'Run new standing v~lve x Kobe'prop.. ]h3~p stuck at 3792'. Wireline out prop from' 3792', pull standing valve. Run tbg gauge of 2.~89", stuck at 3750'.. Run tbg broach of 2.850" to 7400',.ok. Run tbg s{vedge 2.890". Tight spots at 2000', 3750' x 3974". Run swedge to 7450' 'p~].l swedge. Circ down ]'.o,g str'i, ng, ~1~ ann~].~:.;. Run standing .vel. ye. ['~'.ess to 500 psi ,. 'b].ed off. R~n dulmmly prell, l'~:e~.~.~ Lo 2850 psi In cavity, bled to 100 psi In 5 mLn. 1'rap. dummy up l~ole. Reset in cavlty. Press to 2850 Psi, bled to 2000 psi In 2 min. Pull dummy prop x standing valve. Dummy prop lind '2 ~.;cals mtn;sing, standing valye plugged x rubber x rust. Clrc down, long string x up annulus. R~n new S~anding valve. P~'css tsg to 1'800 p~.]t, would ]]ot I~o].d p~:'u~;s. Rt~n 3 x 2-i/8 x ]-7/8'k~..be prop Started ot~t at 1200 B}.'OI'D nE 2650 psis, 56 SI'M. Cu: power oil rate to 800 BPOPD, 1200 psi, 40 'SpM. ?. 18742 WELL 26 kOE 30 '1-25-77 1-26-77 Granite Point 18742 Well No. 26 Inc. PBD 10,.31.0', retrieve Kobe prop x wireline. Prod tst showed loss of power'oil, approx 20 BPIt. Rev out pmp, had one blown seal. Pull standing valve, valve was plugged solid x. tbg varnish x trash. Run new standing valve on wireline, standing valve would not hold press.. Press to 1500 psi, .dropped to 0 in 1 min...Run Kobe. prop, put on tst. .Tst ,. showed loss of power oil, approx 20 BPH. In'j Press 2950 psi, power otl rate 1100 BPD. Unseat 'prop, prop would not surface. RU wireline, found pmp at 3900". Retrieve Kobe prop., x wireiine. G.ranite Point 18742 Well No. 26 Inc. (GP Platform Anna, Amoco 25. PC) Total cost to date $2,255,000.. '. PBD. 10,310', tst 4-way valve x tbg strings. . . .. Pull prop from 3900', pmp ok, seals ok. Wireline out SV:, .S~ clean,'no trash, shows to have been on seat. Run new SV. SI short string. Attempt .to press tst tbg Strings x max press 'reached was. 350 psi while pu'mping down long string.@ 240.0 ..BPOPD. Close annulus valves x continue' to pmp . down long string @ "2400 BPOPD. Press increased to 750 psi itl annulus x tbg strings. Open short string, open annulus. Run pmp. Pmp on btm, stroking at 49 SPM, 1100 BPOP. D at 2950 psi." Sh. ows -25 BPH on prod. 1-27'77 ¢ , , ', · , · 1-'27-77 Granite Point 18742. Well 'No. 2.6' I'nc' , PBD !0,310', SI. . - Press tst 10ng "tbg str'ing: Open annulus valve, SI sl~ort string, set 4-way valv.e to p. mp in position x pmp down long' string (9 800. BPO.I'D" Pres'..; to 2250 psi · ' ' x prop stroking 36 SPM.. Tst short tbg string: SI flow line valve, annulus open, swi'tch 4-w,~y valve to prop out position x prop down. shor't string @ G.P. ]8742 Well. no. 26 (cent.theft:d) , 2400 .BPOPD rate. In 10 rain short s~ring, press t6 10'0 psi, 15 rain to .150 psi, 30 rain to 300 psi. During this time long' String press dropped from 1800. psi to 0 psi x p'mp stroking. Put well on ts t, 1000 BPOPD at 2800 'psi, 38 SPM. Prod was -22 BI'Ii.' PulI prop x SV. Prop looks good, seals ok~ gV clean, looks ok, appears to have been seated...Believe l~ak in short tbg. string. Si well x waiting .on rig to pull tbg x BILA. ICIiOF./~ GF ARI?:A .~. 18742 WELL .26 ~GE 31 i-28-77 1-31-77 2-2-77 2-3-7'7 2'4-77 2-7-77 .2-8-77 Granite Point 18742'Well No. 26 Inc. PBD 10,310', SI WO rig. .. Granite Point 18742 Well No. 26 Inc. TD 10,310', WO rig. Gr.anite .Point 18'742 Well' No. 26 Inc. (PDC Rig 152, Amoco 251)C) To.tal cost to date $2,264,000. PBD .10,'310',. skidding rig f-rom Well' No. . 32. OC 12:'00 noon, .2-1-77. Granite Point 18742 Well No. 26' Inc. , , . PBD 10,310', RU service lines. Skid pmp house. Skid. rig fcom'Leg 1 to Leg 4. Granite Point ].8742 Well No. 26 Inc.' ' PBD 10,310' RU tbg tools .. .Disp short string, long. string, annulus x diesel. 'Circ x kill ~ell. Set back-press valves. · ~ tree, ~ BOP. , Granite Point 18742 Well No. 26 Inc. '.' PBD 10,310' 'pmp NG x prep to Skid rig. Tst BOP to 2000 'psi' RU Dialog, cut short string at 7629',' ull short, string, pull long string. LD Kobe cavity, cavity looks good,, seat looks ok. ' · Pull'x'inspect tailpipe., run tailpipe. PU new Kobe cavity, press tst to 3500 psi, ok. Run dual tbg strings, broaching long string, hydrotesting both strings to 3500 psi. ' Found hole in short string tbg 29 jts above 'cavity. Chg'out jt. Finish running'dual tbg strings, hydrot'esting both strings to 3500. pst,. broaching' long string'. Land tbg, lid tools, ND BOP, NU tree, tst to 5000 psi, in~;'tail 4-way. w~lvc x lincs. Circ x disp well. R~ ~;V, pr'en~ t~.~t to 2500 p~[., 'ok. R~n Kobe. prop. Using 1200 BPOPD. at 950 p~;i, .prop ok.' .RLg roi 06(~0, 2-7-77. Granite Point 18742 Well No. 26 fnc. PBD 10,310' pmp NG " , · Prod avg 35 Bi'i! at 3.1%.BS&W, 1350 Bi?OPD at 2100 psi, 62 SPM. ,iCHO PJ~<;l:, A R E^ 18742 WELL 26 32 2-9-77 Grani'te Point 18742 Well No. 26 Inc. (GP Platform Anna, Amoco 25FC) Total cost to date $2,354,000_~__ PBD 10,310', pmp NG. . ...... 2-10-77 Granite Point 18742 Well No. 26 Inc. PBD 10,310' , prop. 12-hr tst: 708 BOPD x 10 BWFD x 260 MCFD'x GOR 370. 1350 BPOPD @.2100 ~si x 60 SPbl x LSP 1700 psi. !-1i-77 2-16-77 Granite 'Point 18742 Well No. 26 Inc. PBD i0,3iO', .Pmp NG. .Granite Point 18742 Well No. 26. Inc. (Platform Anna, 'Amoco 25PC) Total cost' to date ~2_~R...5..,..0.0.0 ........ ' PBD 10,310', 12-hr {'st: 648 BOPD, 6 BWPD~ 504'MCFD, GOR 778, gravi.ty '41,4'~ AP.I at 60", 1500 BPOPD at 2250 psi, 66. SPM, LSP 1300 psi..' .2-17-77 2-22-77 Granite'Point 18742 Well No.. 26 Inc. PBD 10,310', pmp NG. -- t3ranlte i'olnt .L~//4Z WeAJL NO. ZO' inc. PBD 10,310', pmp NG. Change.'pmp x SV. Prop clean, 'SV .clean'.. 2-23-77 Granite Potn~ 18742 Well No. 26 Inc. ~o-rr~-¢~cO Total cost to date '"$2, 462, 000. ~'~[~'-~' PBD' 10,310', pmp'N'G.'''~' .... ~'---7' · , 2-28-77 (Platform Anna, funoco 25PC) , , · . Granite Point 18.)42 Well No. 26 Inc. · TD 10,860", PBD i0,310'. Surf Loc: Platform Anna, Leg 4, Slot 8, 7.71' FNL, 713' FWL, Sec. 12, T10N, R12W, S.M. BHL: 1019' .FSL, 3068' FEL, Sec' 1, T10N, R12W, S.M. .Field Dev well. Con.~plcted as producer C-Unit Middle Kenai Sand' Rig. OC 1200 hfs, 10-15'76, I~tEL 0600 hrs, 2-7-7'7. 24-hr. ts't (Kobe lift): 673 BOPD x 2 BWPD x 0.3% BS&W x 837 MCFD x 1243 GOR .x 1400 BPOPD at .2500 psi x 60 Si~M x LSP 1700 psi. (Final Report) Eastman A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIOIVA L SURVEY ........ '.'.-.. :- ..:... Arno .c.o.. "P~o d..u¢,...t.£ on Company COMPANY Granite Point State#18742 ,.. WELL NAME atform Arma LOCATION JOB NUMBER A1076G-0204 TYPE OF SURVEY Gyroscpic DATE 12/29/76 SURVEY BY OFFICE GRAN I TI:. PO I ,,_:'-,'.T 1_8!~_~ WELL 2-~--'.- ...... JOB NO. AIO76G-0204 L!', ' EY ,DS AND A$5OCIATE5 ......................................... ~Co:~D OF ....................... _A_L.L,__~ AL..C._UN:~j;_:~.Q ~'~__.P F. 8 F.O R!'i ED B Y SURVEY [ B ? ELECTRONIC COi"~PUTER ..... TR L! F. ............................................................................................................................. D.O.~....L.E.G ........... ' :-'t'S, DqI=-T vF.r~T_!~/:.~L su3 DRI.F_T TOTAL COORDINATE._S .................. __D::?_T~!. "~' '-. _._ A '.:,:,~' ....... PEP.TH ............ Si::. _A_ ...... 0 ! ,?, ~:~ ................ ,.') M DEG. D M S ~ ,,.~.,.- .......................................................................... ('. C 0 0.<)0 -1C5,00 ;,:13. OOE O,OO S ~ ,':.') .... O _.4.5 ........99.,?_')_ ...... .,..5__,.qO ....... .N._i._3._O0~_ ......... ._0_.._63 t~,. 2j.:i:: ........ 0 4. b lq:~.98; ....... g4..eS, Nl_l. OO:.v 1.93~ N 3r,,,'" I 0 2oc.o'7. , ... 194o97 ,-.lO.0": . ,.., 4~0 1 30 399.95 29~.,95 ,N 1.00[:~ 5,,55 N --f-,' F% ............. .' ". .............. .i'".- - ....... , ', . ., 0,,.. ? i5 4~°. · Pc? .39z,. ~ v~e .... ,., ':~- ~:5-~.--4~ ..... .~9-<;-.P:~ ..... :,:51 · ......... . ................. ~ 10 799, ] 4 '-,'%9/~. 14 I'.:z~=,. 9Oo--s 0 89[;.~:/'a.' 793],-7'z,7 ...... F: 4 7-. 0 0;'.' 29,24 N 22,74 W 0,0¢ W 0,00 $ 0 0 0 W 0,000 3,00 0,14 E 0,65 N 12 59 59 E 0.750 0,16 F_' 1,94 N ~ 0 47 ~ 0.~12 1,07 0,22 W 3.41 N 3 46 27 W 0,250 2,29 0,56 W 5.58 N 5 48 12 W 0,500 1,40 '.'i ~,78 N 9 I0 16 W 0,752 6,49 0(,'-" 12.72 N 4.6R ;:,' ,,,~', 17.44. N 10,11 W CO'/..~ 23,08 N 16.~7 ".'.' 13.56 N 20 12 3 W i,D02 11.58 2o.16 N 3O .~ 3'~ w 0.7,50 ~,~,,..Ta 2'~-;2~ N 35 20 ~'5 W 0.672 27,~7 ..... 37,04 N-37 52 51 W 0.171 llr'O,. A. :r.,.... 1097.77 092.77. ,."31.'''''w.,,.. · 44..31 N 1 "¢''' , , ' '-' .'.r ¢~ .... .,:.,~,, 7 30 ll°7,.J~' _~t)9,~. .. 22.00,' 55.01 .... ".~..' _' _ ".' ...... '-, ........ ~ .... "'_ .'., .... 9 ". h.: _ 0_0'.',' 68 · 28 )",: ;.,.)0 ..,~ .. 1.-9.,,J6 ].]. 0.. 5 37. _ 'z,n~ '].2 0 1594.01 ]..'_ ~c · ~l hz*l , ' ", ......... ~; ~'." 83,16 N 29,20 !'.' 35,29 W 46.29 N 39 6 25 W 0.673 55.65 N 38 32 18 W 0,592 ~.0,63 V.. 6B.39 48.14 W 63,54 N 50.19 ";,, i02.66 N 36 26 55 W 1.259 35 il i W 2.631 N 35 53 4.3 .W 1.918 35,99 ~5,20 . . 55.20 06,03 80.16 ",--'Lr~,'1, O 13 1=, 14al.59 ].3~6.'q-g x'41.O(J'~'.' 99.66 · __' ...........'.' ........ c .... ' ..................... '" _ _ .' _ l ........... !/-,cO l~ 0 15hR.56 l~-E3,56 .N ~ 2 · O'C'.',' Ii7.94 !7')C 16 30 ].554.~0 1579,:-:0 l'~C:0 19 30 1779,90 i~74,90 2040 16 50 2007,49 1902.~49 L41.O0','~ ........ ?100 17 30 2064,~{2 1959,82 - -- - 2200 17 45 2160,12 2055,12 ~.:41,OOv. 74.53 ',,./ 124.45 N 36 47 26 W 1.250 90,70 W 148,78 N 37 33 43 W 1,751 139.34 h; 105,59 W 175,88 N 38 7 51W 1,505 162.10 N 12-~.35 W 206.75 N 38' 22 22 W 3.009 187,90 N 148.$7 W 239,73 N 38 23 25 W 0,5il 2].2.06 N 16~.79 W 271,04 N 38 31 6 W 1,524 220,97 N 17'6,54 W 282,84 N 38 37 19 W 1,650 Z34,34 N _188,16 W 300,53 N 38 45 43 W 1.100 257.i9 N 209,02 W 330.79 N 38 58 0 W 0,250 201.32 Z'~"~ '. 4 .~ ....... Z7~,67 293.06 ~22,84 2300 17 30__2255,43 2150,43 ..... N~O,DOW 280.13 ~.' 227,79 W 361,06 N 39 6 59 W 0,254 352,59 RECO?,L) OF SURVEY ALL I C OHPU T E P, DOG bEG :'.',CAF, D;':'IFT \/EkTICAL SU!~ DRIFT .C, F ;:: T ;i A""G L F DEPTH SEA DIREC ..... .' TOTAL COOAD[F[ATE5 C L 0 S U R E S SEVF,.RITY DISTANCE ANGLE DEG/iOOFT --o-i"3-fA-,~[c L 25C() I~. 15__2445.84 2:~4.0.$~.__.N39.50v;__327.17 _25Q-L..].F '~:) 254,0.74 2435.74' N39.50'w 351.4.9 N ' C u_:g.~__4 1__2 63,_5_..49___2_5.3.0 o. Ag___~x.~ .4 0 ,.0_ 0 t'~_ _5__76., D B ~G --.') .3 10 0 2730.10 2(;25,10 N3q · b G".'/ 40i~07 ,~.' 200q 1 ~ _..23__2_8.273.~!2..__2..7i_.~_,_8.2 . .~'J~_9..._5___OW_____._4.2_%..._g3 " 0 · 0 ri ' /%1 ' ~t~fi,~' 1[~ 0 2. 19.82 2o14.~:.2 ~,.]g.:.:O',', ':,50.00 N. '~.].00 I'" a'! 3014.97 2909.a7 N/-~O.OOW 4'I'~.63 -N -. 33r'~ Ir, 4,5 S205.~,3 3100.P, 3 N41.O0'.-', ":ln.91 N --AQ-,¥~.. ............... &-; ..... ~, ~----;,, .....%: x---'-,b .... H'. 7: ~ ..... ET.,.- ': .,. .,+.,-., l& 4.7 ~..,01..:,: ~,196. :~: .~aO....u,~' :~ .0.77 247.25 W 391.33 i'~ 39 1i 5 W 255.91W 422.23 N 39 12 28 W 286.96 W 45~.76 N 39 i3 41W 307,__4! W ~_~_.._23 ....N_3_915__4~__W 3g~.Oi W 51B.12 N 39 15 38 W 0,267 0.500 0.250 0.226 348,29 W 550.1~ N 39 16 32 W 0.602 368.16 W 58!..._.~2_/3__~_9__!__7___16 W O.z+O0 387.82: W 612.15 N 39 18 39 W 0,205 407.51 W 64,2.~7 N 39 22 1 W 0.313 426,82 W 671.90 :'q 39 26 19 W 0.750 445,66 W 700~-7'-5 ;t 39 29 33 W 0.065 '~q.~,, 16 0 3397.51 3292.51 ],.00'.'.' 582.15 /-64.09 W 723 9~ ;,~ 39 32 28 W 0.801 382 · Z :: .... ,~43 · 30 _'~.7.,:+_. 5 e. 505.25 .......... 537.u1 ....... ~98 · 24 .......... 627.99 ..... 685 .-29 55,';0 15 0 3,"-93.R7 338:°.,.F:7 %~+1.007,' 5F.~2.SB N z+81.6B W 755.70 N 39 35 34 W 1.000 ?,TJ~ !5 0 3590.46 3z~SS.Z~6 ?~42.0(';-.'; 601.72 N a98.78 W 78i.56 N 39 39 21 W 0.259 3~53:) 15 0 3687.(35 ~582.C5 N&2.O05',: 620.95 N 0 3f~'3'-?~5 ~678.65 N40-. 50e¢ 640,41 N .......................... 15 SilgO. 18 3775. ].~ ;X4-,2 · O 07~ 660.05 N ..... LOO.O"" ~'.; 680,54 N .3900 "' r', r', 4iOD 16 17 3976.42 3871,42 __4.2_0 O_Z.7__ .0.___4,¢_7_2... 2.2 ..... :59.0.?_,...£._g ._ ~',: 42, '..3.00 17 30 4167.72 4052,72 ..... :4,..n..O('~.,., - (...,. ~, r.,.2 08 N 724,38 N 73c;.~0 '764,. 78 516,09 W 8C7.43 N 39 43 533,16 W 8~.30 ~'-i 39 46 42 W 0,388 8-1~ 7"7 --- 550,36 F' 859.38 N 39 49 22 W 0.271 8~1,44 568.20 W 880.56 N 39 51 32 W 1.062 8be.17 . . ~87,09 W 915.20 ........... 606.64 W 044.85 N 39 56 41W' 0,549 925.53 45(,'0 I~ 45 4z~52.70 4-'fCC I¢2 z, 5 454.7.39 ri. SO0 19 4'1 z,.6Z,.l.78 Zi~-C,O 20 4.5 4735.58 A157.g6 "~;m. OOd 748.23 h'. 675,61 V: 97= ..... ,.32 N 39 53 59 W 0.976 955.22 4252,93 ?;59.0CL~ 772,91 P~ 644.~9 ~'; 1006.62 N 39 50 26 W 0.539 985.67 43z, 7,7C ~.,38.30:', 797.90 N 664.77 W 1038.55 N 39 47 58 W 0.271 lof~"'Tg--' /+4.42.39 ;,~39.0u.~' 823,23 N 68a.56 W 107G.67 ;'4 3'9'44 43 W O.OOO luaS.o3 4536,'-9'8- ....../3"~%-0-0'w 8~9.24 N '/0z~.89 W i103.67 N 39 41 35 W 1.050 1080~-i2-" z, 63o~5~ .... ~-3-'8.00:,'; 876.55 N 726.22 W 1138.3i N 39 38 30 W 0.950 11i3~-~ .... ._ 500C 21 15 4828,94 5!~0 21 47 4921.97 5200 21 15 501~.99 4723.94 N37.OOW 904.98 N 748,04 W 1174.12 N 39 34 34 W 0.517 ._ 4816.97 NS$.50W 934.38 N 769.99 W 1210.77 N 39 29 26 W 4909.99 I'(35.50W 964.06 N 791.55 W 1247.39 N 39 23 i'? W 0.565 r~ECORD OF SURVEY ,,.. . , ,. iD , ~' ALL ,..ALCoL/.~TION5 Ei,~FOR;"ED BY i i~ ~'~ [~LECTRO;.:~C CO"iPUTgR TRLJE DOG LEG ",i F;\~- DRIFT VERTICAL SL!B ........................................... . ......... u,', iFT P :'--'P TH A.'.'!: ~ ~_~ .... _D. E_P_.T_H_ ..... $_~. ............ D ,~.i DEG. TOTAL CC)ORDiRATE5 C L 0 $ .U R E S SEVIiR[TY SECTION DISTANCE ANGL~ D~G/iOOFT DISTANCE __.s!_c~o_2.~_ P___.=.2.9_2..,_:g_'! .... 5_1_a.7.,171 ..... '::~.7_;oo¥,; lO55.9z '.,~0 24 45 5383.25 527,~'!.25 N39.50~,? 1088.33 '-~..7,"~0 24 ~' 5474.2~-~. 6369.2~ ,'-,J44.00W 1119.2,9 . .ftF;O~Q_24.. ..... 0 __5.16_5.. _fi9 ....... 5._4_6.0_,_ f~_9_ ....... .%_'..~?_. 0 (;~,; 1147.27 __5~2._C.',_0 .... 2~, 30 %(;~7.12 5~52.12 i'g,'+9.~''' it7'~ 56 _. . .,. . ,..~ v;,i ..~ # 60C0 24 8.r..'~5.73 ',,\' 9i3,,28 W 94.2. ~6 W 973.~ W C 57~c;.65 ~643.65 ,~:51.50W 1199,18 ~,~ 1004.45 W 1283.78 N 39 i7 ~6 W 0,321 ~.. 1321.86 N 39 13 58 :,:! i.~00 1361.94 N 39 10 1 W 0.700 1403.21 N .39 8 24 W 0,869 i444.54 N .39 12 53 tV 0.963 148~'~.00 N B9 24 5i W 0.~41 1524,70 N .39 40 22 W 0,506 i564.27 N ::39 56 59 W 0.600 1254.ga 1330.25 1370.4i i ~i i e_ i~___ 1~.1.8i._. 1492.0~ lbB2e3.2 6!09 23 15 5.¥~40.27 ~735.27 N57.00W 1222.58 ~< 1G36.96 ~,,, __f,_2_,?_0__25.._ O ..... ~931.53._ t826,53 N61,OOW 1243.63 ;~ 107i.99 ',? 6300 2a 1~ 402Z.~.i 59i7.41 N70.OOW 1260.9~ N 1109.90 ,')400 24 ~ r~i]3.~.6 6008,66 N75.00W 1273-21 '~ 1148.91 .......................................................................... ~5(}0 23 0 42"5.37 6]00.37 ~:76.50W 1203.02. x, 11~7.55 ~,,' ............................................................................................. ....................... 6700 22 5C 63~0.~V &285.17 ,N76.OOW i300.7~ N !26i.93 W ....................................................... 6~()0 22 30 6z+~Z.56 o777,5b N77.00~ 1309.64 N 1299.14 W .................................................................................. 7000 22 17 6(,AT.Ta &5. x,24 r.:74 OOW I328.g-& N 1~73.47 W ................................................... 7100 22 "= 9' . ......... ~, .= ..... -~ -. ..... -__ .............. ~.... ..... 67.5 .77_._f~654.77 ~.7:~..O_Q?~ ~..~__~.9~ ~' 140q.~,. "2:9<D~.2~D %~3~_~3_ 63J7.33 ................ ~'.~75.00W._ 1348.79 ~: 14~4.57 ,~, , , 74C0 21 a5 7037.67 (-~932.63 ~'~71.00W 1358.~9 ~,= 15i9.07 1603.12 N 40 18 13 W 1.1~9 1641.88 N 40 45 3~ W 1,890 1679.81 N 41 2i. 19 W ' !.677 1714.95,~"' 42 3 4~ W 0.880 'i74~.27 N 42 47 i3 W i.0-26 1780.27 ,N 43 2'8-"Z~0 W 0.803 i812.27 N 44 7 59 W .__. 1844.71 N 44 46 i0 W __. 1~7'7.62 N 45 22 56 W 1911.10 N 45 56 4, W --1944.48 N 46 28 ~6 W 1977.83 N 47 0 12 W 2011.~0 N 47 3~ ~g W _ 2044.P6 N 47 58 36 I ~ '?~,or) 2i 30 .713[).,":0 '/C25.&O ,":'/2 i8i2.8~ i65:4.29 1A.~__1 · 4 s 1 '7 Z '? · 8 :762.b3 ..,. 1379.97 ,"" 1554.22 !'/ 2()'/6.45 K 4,9; 23 0.334 !797. iV 0,383 0,336 !~.!66,75 0.499 1'~01 0.152 1~36.86 0.000 i9.7i.60 0.050 ......... O. 527 .................................................. ~4 ~,.' O.ZS* 20'/ 7.GOC, 21 15 7223.72. 71i~.72 7700 2]. 10 7316.94 7211.94 7~'}r.;Zl ~O 7z,.10.19 73~5.i9 ?,~73.0~W 79(;3 21 IC' 75C3.45 '739~,.45 N72.00V.: BOOO 21 5 7596.72 7491.72 N71.OOW ........ ~lOO 2i 5 7690.02 7585.02 N69.00W 2i11.77. N ~ 48 8 w 1401.2i i',! 1.623.(:7 ?,' 2144.69 N 49 12 22 W 0.282 · 2i09.~4 0.153. 21a£.89 fi'=f6-;-~-,)'- .. ~o W 2177.66 N 49 35 49 W 0.361 1411.47 h 1 S5F .,,.. - 1422.33 ~, 1692.74 W 2210.97 N 49 57 40 W 0.361 __ _ 1433.76 N 1726.92 W 2244 54 N 50 17 56 W 0.152 2""-: .... w' 1446.07 N 1760.73 W 2278.44 N 50 36 14 W 0.720 227g.13 ........................... 8 L.._L.___CAL_~U_.L_;~_T.. ~_C ;_'! ..~. ,~ . ....... SU:,V,.';Y i ~3 NJ. F-LPiCTRONiC CO~'-,;PUTER :. ~"" DRIFT VERTICAL Sbq Dr-'. t FT __ L..--.. '.__.., · ...................................... . ................... ,.,"'"i--]!:TM ANGLE DEPTH ,c::"A. D I P. [-"C DOG LEG .TOTAL CCORDi?.~ATES C L 0 $ U R E S SEVERITY DISTANCE A'i",i O L i~ DEG/iOOFT 0 M S SEQ T I D[STANCr 7200 .2; ............... :'~{':'- ~'-'' ....... - 35 N~7.OOW i4.59,,52 ?; 1794.03 ',,: ... ...... '~300 21 0 787..:,.71 777!,71 N65.00W 't4.74',i0 ;'; 1.12.%.76 V..' 234-7.35 ;',! 51 _.~/,..O_C~.2.0_3.r,.-'_ .... 7970.22_._ '71: 6 5. .. 2_~.;., _ .N 6 3. ...07~!; =]~.__z_L.8~_..__6_.3.__;~ .... i_.~5_~,L,~L! V,: 0') 20 ¢;,'-'06/,, .. .[;4 'laSg.O6, N61.OOW 1505.8~ .',.I. lo.,,,.16 ~,,!. 24.15.9i "'t~60(~ 13._l..5_2',:..i.5_~'._.._;'3_~_~:!p%.}_,2.3__D~6_(')_;._'Q,_'.gw 1522.41 ;,: 1918.40 W- 2;+49.08 N 51 .33 ~3 W 0.7~ ("). 272 2312.'b7' - . ~ ,+ '/ . ,'. ;' · _ .... 2'-,19.90 ..... ....... 2 ~+ ~,,~ 1 · 53 .............. ............... i9a5.62 W 248i.53 N 5i 4.0 9 W 0,272 1971.68 W 29~O.53 N 5~ ~5 I~ W 4.000 1992.91 W 2535.~2 N 5i ~8 97 W 1,007 20].2,67 W 2~56,88 N 5]. 2031.4.9 W 2581.53 N ,'!700 19 0 ~ 7' ui/+7.71 :',~59.00W 1539.O4 ~_ .... . ....... .. _Z _., ,. · ~. - ..... :.. _ ...................................... · - ~ ~00 15 C ~':l,~.~:.j t2z, 3.3:5 N5~,OOW 1554.1u N ~-_~ .................. "~ .. _ "l ............' _., .......................... . ~OOO 14 r) q/.',5.1z, t~34. C'.14 N57.00'X 1567.37 N ~1_~.0__13 .... 1.5 ...... 9542 · 32 .... [.~.4.]_~_l_~2_...:_t~9.7_._0_/J_~%'___~_5_8.0_. !J)'"t.~ ~_1 49' W 0.790 . . ,; "C3q 71 ~353&. 71 N55.OOW 1592.b9 ........................................................................ ~(}0 ~ .... ' 20~9.5~. W 2603.87 N 51 55 4 ~ O.1B8 12 ,,., ~737. ;-:% ~:(,32.1~ N53.00W 1606.0~ .................. ~ ........... .~ .-, ~ . 9300 12 25 ~f~34.'/6 8729.76 N52.00W 1619.35. ........................................................... 9400 11 20 ~{932.6! fiP27.bl NSi.OOW 1632.17 :',: 2082.05 W 26~6.3~ N 5i 55 10 W 1.091 ........ 2625,69 26~6.28 95r'9., . 10 3'D eO3.~.. . "'...'~;," ,~92~ ,. 80.. .'",:50.00",'.'. . l&44.2P, _ N 2'*n7~;,' .67 VI 2665.27 N 51 54. 34. W 0.841 266-5.22 9600 10 9 9120.2] g024,21 N48.OOW i655.d-9 ~','. 2111,10 W 2663,04 N 51 53 24 w 0.504 ~ ~122.72 ,h~6. OOW 1667.59 " 21°'' .,9790. g ~5 n22'Z.'7,' ..... r ...................................................... ". e ....... :.64 k 2700.13 N 51 51 ~ W 0.256 9SO0 9 15 g32~.35 g221.35 N~5.OUW 1679.16 ',1 2i35.~1 W 2716,5~ N 51 ~9 14 W 0.501 .......... __. 2700.09 2716.50 oqO0 o 0 94.25.(:,e 9320.09 N4,4.00W i690.4.7 ' '"" N _,_,~ d a 0 8 50 q523. i:' 941~.Pn 4.3.P 1701.72 --- . ......... .. '- ~ ..... - _ _. -1_,, - ...... - . _.'-' ':1OO 8 10 o62". ,..7a c~1'/.78.,... N42.5Ct,', 1712.5~ ._ '?,~,~.200 7 .5.0__9721.80 9416.~0 N4.1.00W 1722.96 __b0_aS£, ..... 2_A.%__P_'7_7.._L._.%Z ..... e.6 <,~,.....~7 ........ N %9 .,.O~;:'L__.~_T_2_7_. ,) ~ 1.0344 6 z+O 0864.6P 9759.68 i',36.8 OW 173~.9b F~ 21z+&.53 ',,; 2732.26 N 51 z+6 .. :: 2157.20 W 2747.61 N 51 4.3 · '~ 2167.24 '.'! 27~.22 N. 5i q.'~ 0.162 1W 0.$7u ..,',' 2~76,5i.. W 2775.~4.. N 51 38 3 W ,',) 21g0.73 W 2'/82.~7 N 51 36 25 W F', 2i~37.73 W 2793.4.3 N 51 33 5 W O.B31 1.182 0.018 2732.2~ 2752.2i 2775.9B 27U2.3'/ --S'OF~:%-/.";-"~,'SLE CLOSU,q,~ 27'9-~-.'%-?-/E~-~ AT N .51 33 ~ ",¥ i.~.!T.E.~PGLA_-FE-D_-T.F;_U~_..VF:F.LT_I_¢AL-_..D~P;T_H.,S "R- ' "'-' ' ....... " · ,-~ ;~,z_ ~,,~ r:'. ^ ~-., ~ r~ r.: r-, ' VERT iC6L '" '" NAT.-",~ C L 0 L~ U ,~ E _,-_~,_' ..... ".'_-.._;-,.,.,_,.,__;.,,..u ...... ,0 , AL COOR D I" "~' ;,: A..4~ ~..F.. P__T t_.I ................ L)_!.'?_T. _b... ..... D I 5 TANCE ANGLE D ~/, S ... SUB 5F..A '.',-'.',~' ,,-",':" __DE~_Ti-,LA.~D OZJ-:IE_P,_L)_A_7.A., FOF< EVERY EVE,"," . _' L.,"% ~ ~. ,. ~._,,.d ..... 10o FEET OF SUB SEA DEPTH, T R LI F.. ,~.~E A SLJR ED VERTICAL O~o'r~ DEPT~'i ~--.', Ill VERT I CAL ¢ORRE¢T i kji ~ TOTAL COORDINATES 2_.'_j~5 ., 2.o.%. _]. o.o .',; 3o~ ............ 3_0..5.: ......... 2.oo ............ o 40-~ 405 · 300 ~05., :505. 400 0 no% Jb%. .¢'b~ .._70 4_ ...................... 7._0.5.: ........... 600 ............ o r'06 80.5 700 1 · ~.. _.,. II .. ._ ,...,., ...., .......... _~ :_~_ ~.~' ............ _0_:,_.:.. ........... ,.' 0 .............. i .~_.!_0 7 i i0.5 · 1000 ,._ 0 Z.O0 N Ot15 E 0 3.~9 N 0.25 W 0 5.6a N 0.56 W 8.84 N 1.50 12.95 !'~ 4.92 0 17.72 N 10.~4 W 23.45 Fi 16.74 W C 29.59 N 23.~.3 W 0 36.63 N 29.6~ W i 44.97 N 35.69 W __ 1.2.0.8.. ................. 120 5 .. ...... 1..10.0 ............ 3. ................... 13¢)0 .... 1305. ........ 1.2o0 ...... 4 1 55.99 N ~1.0~ W 1 69.5) N ~9.10 W 2 8~.90 N 61.70 W I~1~ 1617 172] 1932 2C37 2142 22~7 23~2 ,....~wS.: '" - ....... ':i.-¢ CO .......... 12 ] 705 · lTOC 16 I~,05. 1700 22 .i o05 · 1200 27 ? 0 ~ n ....... 19'A'O ........ 32 ........... ? i ,'~ ;~. 2 coo 3 7 .............................. 2305. 2200 46 2 102.06 iN 76.62 W 121,24 i~ 93,66 ;;' 4 14~,01 N 112,49 W 16B,99 N 133,91 W 195,95 ;'4 155.25 ','; '220,31 N 243.90 N 196.47 w 268.01N 217.35 W 292.20 N 237.82 W 2a57 2435. 2:-}00 92 6 316.93 N 258.27 W 25(:2 ............... 2.50F, .. 2./:00 ............ ~_7 ........... 5 342,32 N 279.18 W __ 2.~fL8 2.,%,C!~_. ........ 2qO0. __62 5 368.2i N 300.66 W '---,- 2_7.7_3 _2.7.0¢,. ....2600 .......... 558 6 394.26 N 322.46 W 2,°79 2.qO5, 2700 7t,. 6 /-,20,81 N 34~,00 b" ...................................................................................................................... : ................................................................... .............. [ 20'r'./+ 2905 · Pc;O() 79 .5 446e 31 [',.' .36,:¢',, :'~2" fog% ~'0-6".5, 2?o0 .......... -,~ 5 ,,7i.i'3 ;,: 385.,54 w 3194 3105. 3000 89 5 495,31N 406.3-1W · ':. ,~'%' ']( . 32~c; .~,_0,,. 3].00 94 5 5la 69 N ~+26.63 W 3z~04 2.305. 3200 99 5 541.56 N z~46.33 W . 3_%0.~ 34~, 3300_ ..... i_Q]. 4 563.78 N 465.50 W " 3(,12 3505. 3400 ].07 4 584.58 N 483.58 W ' .... · 221_5 3 604,60 N 501.37 W 0~: SLaS. SEA 3 ¢ .1. ~, 3705 · 3600 3922 3no5,. ~.700 117 t+_02...6 ................. 3 o '~ 5.0 ...... 3,? 0 ~ ........ 1.~ 0 4 ~39 4005 ,__3900 12~ VEldT ;[ CAL C 0 l-;,.r'~ EC T I 0."'-,'. TOTAL COORD iNATE5 · o 2. ~ · 53 N .51_9__t3_0 W S ,b 44.7,5 N 5.3 6_ ._8__~... 3 655,12 ~ 554.91 W 4. 686,95 N 573,63 W 4_23_4 . ........ 43.95 · ........40?.0 ....... ]..Z.9 433_9 ..................... 420 5 · ....... 0,.1_00 ...... .... :,,,.,..~ , 42,.u ],, :' 4-55..'!. 44~5 · 4300 1 z:.4 .......................... · _ .......... --_ '_ z,.6.~ 5 4 ~o5 · ..... .~_~ c__,.O_ ........ l_'~.o 4761 4605, 4500 15:5 .. . _- .................... r'~ / ~. , /+ '~ h_7 z, 7 ,,.:~_: ..... ~,_,~__0_0_. ....... 4.97/L ................. /, a.O_5_., ..... ~ 7_0.0 ....... 169 50~_2 49_0~ · 4 ~ 00 176 ........................................ 5297 5105 · 5000 191 .................................................. 5405 5,_2Q 5 · ~100 199 5514 ';=05 5"00 209 _- _. _' ..................... ~ · ........ ~- 5624 54~5, 5300 2i9 5731, hq05. ~.400 229 5~43 ~'505, 5500 238 5952 5735 · 5600 247 60~,2 f,~O5 ..... · b700 257 5171 5905, 5~0 265 ---- ~ .................. 62R]. 60~5. .... 5cOO 276 ................ '-) . ........... ~90 Oi05, 6oS0 285 S500 &2.~9 · 6100 295 671& .... 6824 69 '43 7'b-d-1 6305. ,:: 2CO 302 ,~,z~0.5. {:,..CC. 3'-i s ~i%". ..... ~;~ c e ......... ~-'~-'~ ................ 6705. 6600 336 7 929.00 N 765,86 ~ 960.97 N 788,99 7 992.57 N U12.24 ~ 102~J41 N' 837.19 lC 1060.47 N 863.62 _. 10 1096.0B N ~92,09 i0 1128.95 N 922.97 W 1i58,70 N 95-6.01 W 1187,09 N 989.25 W i0 12i~,17 IN 1024,22 8 1237.59 N 1061.36 11 125~.10 N 1102,51 9 1272.i3 N 1144.97 10 1283.15 Fi 1187,36 W 7 1292.50 N 1227.86 W 9 1302,18 N 1267,88 W ~ 1311.75 N 1~08,09 W _. 9 1322,08 N 1348.66 W - 8 i333.07 N 13B8,39 W 7].4e 6605. 6700 344 8 i343.78 N 1427.86 W 7257 6905. 6800 352 ~ 135~.36 N 1~67,36 W 7~65 70~5, 6900 360 8 i365,14 N 1506,53 W · · 7972 71n5. 7000 367 7 1576.82 N 1544,44 W _FA_SL!:°,'-iL) D.~P_TM ;,,r -' ;4; :~ _.E-'_^T EVEN lOP, FEET CF SUG SE.A D=PTH, V[5'2 1' I (]AL ._~_¢ P T ri ...... . D-TvD 5;L&._!J.I..F F E R a i'; C ~ __.Y. 5_LLO 7j,"./.LS_, T_LO.e 3 75 760 7 ....................... 7.3.0.5.., .....7_2 O0 ....... 779t~ · 7~(15. 730('1 389 VEP. T I CAL ' CORRECT I O,'q TOTAL CO0.RDINAT, gS, ,. 1388,79. N 1582,0i W 7 i309.91 BI 1619.1D W 7 1410,83 N 1650,22 W 7002 7505, 7400 397 1422.51N 1693.31W 80OC 7605 . 7500 4.04. ~ll& '7705. 7~'"0 ~11 '~29~- 7!~05. 7700 4i~ : 1_ .~ c...,. , ........ ~ fi 3 ~ n ................. 7~P_~.__3 ~ 00 ...... ~+ 2_5 ...................... 55~.n 9105. 8000 439 7 1434,81 N 1729.94 7 i448.!5 N 1766,10 W '7 i462.77 N, I$01.60 W 7 1478,68 N 1836,45 W 7 14%';5,56 N 1,970,06 W 7 i513,09 N 1902.06 W 5 1530,53 N 1932.31 W 6 1547,74 N 1961,10 W 4 1561,89 N 1904,35 W ,"..'._o 6.2 ................. ;: 5.o_~.'~ · ..... _..~h:_..n_ 9 ...... 9064 8605. 8500 4~9 ') '1..":,-7 .................... '.!-7 05-' ..... -~.i'6 O' d ..... -4-6 2 3 i575,35 N 2005.21 W 1588.27 N 2024.81 W 1601,64 N 2043,68 W 161~,23 N 2061,6,3 W 92/%0 ,9 ~ () 5 · 87(:0 464 937~ ~a05, 8n .... , .... ,, 467 .................... ...... 17i0-6 ...... .3 i628.6~ .N 2078.67 W 2 .. 16z+1.12 N 2093,96 W .. 1 1652.98 N 2107.~4 W .. c) ....................... 677 9-2'0'5 ',' -- '-0-1- 0-0 ....-472 9778 a '.a '.'.) 5 , 9200 473 2 1664.83 N 2120,81 W i 1676,65 N 2132.89 ;'.' 2 i68~t,18 N 2144,31 W 1 i6-99.56 N 2155.19 W i 1710.'70 N 2165.46 W g880 9405 · g3CO 475 9c, r~ 1 "5. ........ ~ 9500 477 10082 96,.~ ~ · 10123 97C5. 9600 478 1 i72i,25 N 2174,92, W !_Q.2r~4 9805. ...... _9_7_Q.0. 479 i 17~1,29 N 2183,.~5 W -t-~-~T-E-;~-P- 0 L,- A-T-c-.D--V~66i-,~-.--F'--C~ ~-~-~V-F~ ,- 1060 _'_.F_Z,'-:'_T__QF' i¥;.2.AS U.:~F-D--D~ P T H: ....... ~-i"--: ...................... D_~½" T H. pif. PTH 56_A 'tOTAL COO;~,[) l I~,A Ti-' 5 2. D__0.0__ 1._~_6_ 9.. .......... 1 p. 6 z' · 3_00_0 2P_1.9_._~27._] z:. __4_0.0.0 ......... ~_~ ...':-..0_.. .......... ~. 77. 5, .~_0__,,_0 4 ~ 2 a.' · 4 72 3 · 5_0.0D ~ ? 4 t;.. ~.6_5.:%. e 0_C ':) ...................... 7..5 9_ 6.. .......... .7.z: 91 ... ;._ .z.J.L~/ ................ 1.s:o. 0_0 ................ .9_ 5_~_~__., ...... ?his · 212.06.':'"" 15~.79 W 660.i0 N 550.28 W 904.98 N 74B,04 W 1199.z, 5 ',' . :. 1004.22 W 1329.02" i~7~.. ,~ ' 4I W !..~33.75 :'-~ 1726.91 W kS._8_O_,_M9 F: 2012,67 '," 1701.71 N g157,20 W ' ......... _ ...... - .. ......... ; ..... ; .. ,. ..... ........ ". ....... ' ..... ) .......... SCALE 1"=500'; ii' 7' ..iTl I~i-.':-.:'~.i.' i':~.~7, i ''7-';11' ........ ; ............ -'i--i ........... ; ..... ! ' AMOCO PRODUCTION-COMPANY ' ' .... i ..................... i ........... ~ ' ' G.E 18742 WELL 26 ........ ..... ; ....... RA Di [J s "OF'-C'O'RgATO'RE~ ......... " ~ t ..............: ..... I , . i ' ' ' GYROSCOPIC SURVEY ,, .... -.-:'-, "- !' .'..--..- -: :,-: .... , · ' ......... ;:: :; L: ' -'_'. -. .- . : ; l_' ........ -, ............. t .................. ! .... :" ........ : .................... ............................ ...................... ................... ............................. ' . " '' . ............... ' : ~ ' ; · m ..... ..... ',. ............ . . ' .............. , , ' ......... , i":ii: ~ .... i ............................... { .... . ...... ;"~ .................. I ................ ; ................... :, . . '" . · ' , ............... .. .................... ~ .......................... , .................., ......................... ' ' '~' ' TVD= 9;865", .... ;. .......... : ! ..... - ............ i"';' ................................. i .:i.":":,:':"."i i '; "' [ "i'"'. ....... TMD"~io:344 ..... i.".;"..~-.:i..:~,:.'il ".~';'7",-.'; 'i!.~'.~'' ;':;, i, '[.~;,7_i'~.':i"-.';..: ...... , ......... : ............. j · i j ..................... · ' ' ,' , ,.,! .................................. L ...... '_ .......... [............... J' .............. [ ..... ALL'..DEP THs.._ I ' ' ' II~, ...... : ..... ~ ............. ~' ' ' : .......... ~ ..... ~ ..... R '': "' --'".'-:-""i ........... .".;".'~'*~.7.".'" ARE TVD ............ 80OO' ~ : ' ; . · . ' , . ' : ' .... · . · ' .! ,7600 ; : ~ ~. i . : .......... ~ ...... .. ............. : .................... , ........... ; ......... , ................... .[-.-: ..... ....... ~~ :.. .............. r ...... · ...... , ......... , ........, ..................... -t ~ .......................... ......... ~ ........... ~ ~6~I"~.I i ii m" ': i" i~ III ...... "II ~ "i.:I" : ':i : I".II: : :.III Iml: I.I..:111. l.m' ' Ii'I ....... '.. . :'..'...'::'.'..- ".'.i.:.: ..Z'::.::'i:::L. '..:-:::.':i::'- :...:':::":.'. "::':.:': ..'":.":::.:'i.":".'..:..:.:....'.:.:'..:.':' ..' .... 'i. 4ooo . ' .: ''i : .... " '..". ..' '. !. '-' '.'." :":..:'.':':' ' ' t ' ~ ~ " ~ 3600 : : I ............... ' ............ ) ..... 2800 ' ~ 2400' 4 ' . i t , ; , ::::::::::::::::::::::::::: . ........ ,, ............................................. , ~ ......... ,. aooo .................. , ..................... ! .......................... . ................... '7--~' .................. ~ ....... .: ......... . ............. i ............. ~ ......... ; ...... : .................... ' .' .........: ........................... '...f .......... : ....... ! ........................ I ....... ' .'. "..'...-i':" :': ..... :.. I ............... ' ................... i .................. ! .............. : ................................. =~ ................. : ........ : ................ : ............ =,...-' ................ '...' ..... ..... i.'. ...... i ............ ........... . ........... i! ..... .... I'1{ .... ::.:.:Z:"l:':'.:...':...:~7 :" i": ............... I ...... : ...... 3 ................. i .......... ! ....... .'. ............... ! ........... ' .... [ ............ : .... ~ .............. . ...... i .... ...................................................... r ..................... ;' .......................................... ]--.,~? .......... ~ .................................. ~, ............................................. '-,, ~, ................... ; : . { : ~ / ,, . ~ r ) . ; ; , ................ ; ............. ,. ................. . .................. J~ ...... . ................. ~ ............. ~ ....... . ........... { ........................ { ...... ,.. ~ . . , , : · ~ , . } ~ , ~ , . ; . ~ · ' ' ) . t '. ; - : . I : I ~ ' t ( .... I' ' I' I ' : II III:' I'[i'" iiii Ii II IIiiI : 'I: :,ii I i . I' I : ~ I I 'I I t ' I I: ..... { .............. ~ ........... , ....... i .... ' ........ ~ ........... ~ .... : ............ ._' ...... :, ................... ' ....... VERTICAL_ .SECTION · ' ........... : ' ; ......... ; 'SCALE1 ; , _ ............ - ..... . ; ............... .,...- - ....... ~. ......................... , : ........... ................. ~ ......... - ..... I ..... AMOCO PRODUCTION COMPANY .......... '~--' - .......... : G.P. 18742 WELL Z6-'~ ............ ; .......... ' ! ........ ! ............. . ............... GYROSCbPIC SURVEY. ! ......... : ..... ' .-i ......... " : i .. .L .......... ! .... .. ......... ,., ...... ....... r · ..... ' ~ ' ' .............................. :-". ........................... ;'--'"' .............................. i .......... ........ ' .......................... ...... .~' .... ' ----~-' ~-~:)0 ..... "j ........................................... ,i .................................. I, ..... ............ '. .............. .,.~ .. ..... ~ . ~ . : . . ............ { ........... ' '" :'""'?" '"'": :: ~ ;80o ........... ........ :..: .......... t . · · -- .52( ......................... ", ..................... ~ ..................... '; ...... . ................ ~ ........... ....... ~ ' , ~ '._ .,..:.v--;' ...... I . ..... "' ....... " ! ALL DEPTHS. SHOWN.'.'-" ' ......... ARE TVD .... ~ ........... · "' .................. ; ................. t ........ :' ...... . . '; . 6400 ~ · · ' ...... ; .................. .'- ........................... .-"7 8800. ~ ......... : ........ ; ...... t ........ i ..... ' ......... I .......... I ........... · i :. . I.. ~z°o. .: ....... l ...................... i.-.~ ........... :..i ......... ! ...... ; ....... r-" " ~ I , ,| . '.i ...... i .... ~ .... '... .. , . , , ] , .....t .................... ,'..'..L'._'.....;...C ...... '. - 'i' :.'"- ...... !-' ......... i' ."; ....... ~,'~o~-; ..... .-["'-::-:-"'.--:':7:':': .Y: I' :.; .... I.. .' ,. ...... , ., t--, .... '~- ....... I ......i ........ 1 ' .i. : i" l.. ...... iI . .' i':"! . ' ' 1 : ! ' . . , .. . t ............................. : .................. · .......... .... ' ............... -i .................. ~ ................ i .................... ~ ......... TMO=IO~44 t ' , ~ . , : ' I '~ ' ' f '" : ' ': ' ' ' ' ; ' ' ' " "'" ' .'. ~', -,. t . ~ ......... I : ...... ", ..... : '} ...... " "' t ' " "' ' ' " ,,,,I,,,,rA~ 01¢1'._0 Y~CDUCTI0N CO. :,,_ GRANIq'E PT. 187'~.2~¢26 ,.i,I GRANITE PT. . ,,,,,y COC]f INLET s,,,,. ALASKA C()ILE I.:\IR)R A'I'( )I{IE$, l~C.i" l'.trotcu m R esrrvtn'r DALLAS. TEXAS Formation c,,,,.~ ~T A~t~lD Drilling Fluid Elevation l'-',g~ -% ,,r 2.. ,:s,~_BP- '3-4! 5 .. U:,l~ lt,l,,,r, 1/1 A,,-~b'.,,., WSP. RB . Ct)ILI£ ,,\ N,\ 1,~ SIS ILESUI,'I'S (l'i['urc,4 in p:trenlllt':,c,4 rcrcr lo I'n~fsmlt' rL'm;irl.~.) ,\MI'LE I. UM lil';It I)1]'1'11 I.' l.: El' 3 4 5' 6 7 8 9 10 1'1 12 13 14 15 16 17 18 19 2O 21 22 2-3 25 8471 8472 8473 8474 8~7'5 8476 8477 8478 8L,,79 848o 8482 8483 8484 848'5 8486 8487 8488 8489 8490 849i 8492 8494 8~95. 8496 Pl.: R M i.:A Ill LI'I'Y MI LL! I)A It(:YS Ih~rizontal J Ih.izontal Maximum 90° 25 22 1ol 0.6 1.2 20 18' i5 i4 32 27 39 112 32 18 14 24' 10, 2.1' 41 30 · 15 0.7 1/4. 30 i. 6 24 6.6 1.2 ' 162 95 Vcrtkal l'O It O SIT Y !' E It C 1"I4 T 26 12.7 45 7.1 903 7;0' 17 14.7 --- 13o5 14 13o8 43 15.4 33 17.8 23 13.4 16 13.5 --- 1.5.6 9.6 14o 3 5..3 1"3.3 --- 14.7 --- 16.6 29 1,5.2 05 9~ 8.4 1.5.9 19 1~.4 9..3:1 '2.2 13' .12,1 28 1.9,8 38 18.9 --- 14.,8 (;RAIN i)I'?NSITY Itl::;il~tlAl. SA'I'I tlC.\TION ()il ' JTotal \Valor l'ore J $'~' Pore ILI:;MARK$ 11,4 13.6 19.4 17.0 10o4 1.2ol 13.o 14.'5 14.6 16.o 12.0 11.2 13.2 12,2' 14.1' 1.2o6 14.9 9.9 1.1. 08 700 10.I .9,8 10;4 13,.o 37,0 42,8 4.3..2 43°8 4o. 3 39.0 43° 5 42°4 43.9 49.1 41.2 42.9 49.6 42.1 48°2 37.7' .47.5 .47.2' L~5.4 ~1.9.2 59°6 69'.3 ~8,9 .53.3 ss;, f- cg,feb ss,:F-mg,v p c, b ss,m-¢g,sc Deb .ss.,m-cg, sc: peb ss,m-cg,peb ss, f-cg, sc peb ss,f-cg, sc peb ss, f-cg, sc peb ss, f- cg, s.c peb · ss, f-cg,sc pe'b ss,f-.cg,sc peb ss, f-cg, sc peb ss, f-mg ss, f-vcg, p'eb ss, f-rog 'ss, f-cg. ss,vf=mg, slt .lam ss, f-mg ss, f-rog ss, vf- cg, s'l.'h lam ss,vf-cg, slty ss, ;f'- c[.r. .. ss, f-c.g ss, m-vcg.peb , , These analyses, opini(ms or InterprO. rations are based on observations and materials supplied by the client'tO whom. and for wh~ excl~ve and c~fident~l uae, this re~ is mnde. ~2~(. interpolations or opini~ms exprea~d ~present O~e best' judgjnent of Core I.aboratories, Inc. (all e~m' and ~nissi~.s ex- :optS); but Core ~)ra~ries, Inc., and its officers and employees, a~umc no rcslmnsil)ility and make no warranty or rvpr~ntatlcms. ~s to ~e pr~uc~vlty, pro~r o~rat!on, or profi~ablene~ ~ any oil, gas.or other mineral well or ~nd in connec~ wi~ wh'ich ~ch rcrm~ is ~s~ Or rell~ u~n. . C[)I[I!i I,,\IR)i{ .,\'I'01~ !1£S. /'r trob'u m R e..,r.~., ir I'~.git~ecri.g D A LLA S. 'I'EXA S l-~)r nl:llioll__ o ,,,..,_ D I A~ON D · Page_ 2 of. Fi,~_ BP- 3-41 5 l)rilli.g Fh, id Elcvaticm ^,-"~r~,.~ WSt;, RB' .ocaliOll, Rem:,rks P£R.~SI~'¥ BI__.BO.YLES T,~_W (X)ILE AN.,\I,'fSIS I~.ESLli,'I'$ (l"il:urc~ in i,are,lhe.,c~ rL:fcr fo f~)*.fn,~lt' rrnl:~rJ,k) PI~It:dEA BILITY RI ' M i L LI I)A ItCYS S.& T SAMPI.E DI'I'TI! ] ] I'O ROSll" Y ¢;R^IN NUMBER I"l.l I.;T llorizontal liorizontal Maximum 90° Vertical . I'EI~CENT DI'iNSI'I"~ Oil ' ' % P(;re J'.$) DU ..\ 1. SAT UR .,\'1 ION I'l'.tal Water .[ ',$ Pore 26. .27 28 29 3o 31 32 33 34 35" 8497 8q98 10 8L',L!. 1o853 ! 0854 lO855 10856' 10857 0sSs 42~ 172: 0.0 6.6 '0.1 0,1 0.0' 0,1 0,1 O, 2: 25 90 0.0 0.0 2.3' 0.0 0.0 0,0 0.0 0'.'0 13.6 1.4 .,1. 1'.3 3.5 4.7 4.7 2,.7 6..7 4.2 4.2 9 1 I.i'v $ ~2 0 ';S ,' -- , . .... · 22.6 65,7 3.1 68.9' 1.7 7K.O 12.4 71.1 11.7 7'0.2 18.8 66,0 13;o 63.0 fi;. 5 61.8 I{.I~MAR KS , , sr.',, m-vcg, pet! s ~:, n,.- vcg; pet: sl. tst, shiy se;, vfg, i'nbd sa~.:e as above sanle 8. S above sa~6 &s above . ss, vf-f~, inbd same 8. s abov'e s~u~e as above s].ist & e. s].tst ~. sh These analyms, opiniomms or Interpretations are based on observations an(.{ materials supplied by the client tn whrnn, and f(n' whoa: exch~'ive and confidential use, this report is made. 'I33e interpretations or opinion.~ expr. es.~ed represent the best judp3nent of Core Laboratories, inc. (all errors and omlmissio~l.,} ex- cepted); but Core Laboratories, Inc., And its o/fleers and employees, a.,,.'~ume no re.q)onsibility and make no warranty or representatio~ms, as to the I)r'oducUvity, proper operation, or profiLablene~ of any oil, ga.5 or other mineral well or sand in eonneeLicm wiU~ which .,;uch relx)rt is used.or relied upon.. Amoco Priwluctio'n Company , SCOUT TICKET i." S~ATE ANCHORAGE AREA (.OUN fY .. PARISH BLOCK SECTION TWP COMP^NY AMOCO PRODUCTTON CO~'~A~Pf SURVEY RANGE LEAS~ GP 18742 AFF NO. & T~E .... LOCATION __ WaL NO. 26 FEET FROM LINE: N .............................. F ........................... ~j $ .................................. W DATE SPUDDED DATE COMPLETED I PROPOSED DEPTH ELEV __ __ IO~_. PFS CH PF~ CH CASING:. OTHER TP ~ GOR GTY TP. GOR 'GTY @~ ' WITH -- @~ ' WITH @ WITH AREA r IELD E APl WELL NO. · Iw, 0 I"' 0 omo 0 jOT.E,I°"SET w, 0 01°'='s" "' 0 '7cc o1,-, o PROPERIY NO. QTR ,. MAP NO. DATE SAMPLE TOPS FORMATION DEPTH 'FORMATION REMARKS ELECTRIC LOG TOPS DEPTH · OPERATOR PAN AM , ,/ FLAC (~9730193, API ~50-133-20297. 10-18-76 Granite Point 18742 .Well No. 26 Inc. Granite PoinL Platform Anna, Leg 4, Slot 8, 771' FNL, 713' FEL, Sec.. 12', Ti0N, R12W, S.M., .PDC Rig ttl. 52.. PBD 1970' RURT x prep to skid mud pmp sl(id, 10,500 , · Mud 8.3. Trip 8-1/4, skid rig x RURT 57-3/4, ,- OC date 1200 hrs, 10-15-76,. KB 105' MSL, suspended 7-15-67, PBD 1970' , ~ 13-3/8" 2022' 7-1.5-67 ~ ,, · Rig 00'1200 hrs', 10-15-76, 'skid rig x RURT, trip, O I' 1500 5'00 · · -~'--':-" ....~ ~ , !~:C'~ '-- ' ' ' ' C--:'? .., IBVH~IIlIWE ' ~ CV~li4e BOHD AVBIVBFE DEH?.IIA -. ~.~.o~ . ~o : . t.~ou, lo : !.,o.'u ~,o .. . VAEB¥OE ]/,,,Err DBiI-I; S :S ......... I.]U!?p CDr ..... ! ' ' . ........................ ....................... - .... ! ............................. 2lOLl cdr ...... -t .... ·-.4-.- ............................................ ........... :.. "'iSt~Tin'{G ............... i ......................... ' 'En-,;',T~'!'G B '-'. ~,'5'J ~ ~-i' .... t ........ ? .......... ......... /. . .. . ........ .. ~ ......... Uu,e COU~laul .mai'~6;'.finib ~.~;n, ~ .i · ' ..... .......... r oaci~6~' ~b~:~,ci "0 ................... :,- --:~ .... '., ... ........... ,, ,~ ,.. ~ ¥' --~. . .. ; - . ...... ....... ~._ . ....... ~[ ........... ] - ' .... ; '1~60 lui~-'u~!~,x ...... ~"T -T' i~Sal<qo.,~u 5,-'&~;-n~:~, ..... ~ ~ ... : ................... -i .C~b JUl(;a?llX ........ : · ' Caq' Oa!u ..... · ............ iin!q ' "'- z""i'" ' '; ..... 'i'b I~;^~i ;W;'~'~ ........... 'flavex ' - .... ;~-f .... .i .......... ~o. }~"..."'J"~i ..... '"""" : .... ..... ] .... %. -. ..... ~,, ~;. ,~. . - ...... B~muqe~ '-'[' ~o,lJO'l!'S,~i .,'x'br, ¢'EWC0 ' . .:.__ = . . ....... ~. ...... ... . . . .... · . ,._i ....... ~;; . yqq,,,a~ .... .-: ' ' OS b.::6';'! '~o ?S0 ' ' · . _ ..... .__- .... ..' _ . . .:..? ......... . . /',°lnme '~i c~',,eui .- ,v~-U~-baU~l 14o' I Fb° . ........ - . ........ ,: ......-._: .... ~ ~. - ........ ~-~- ...... CGU.~GUi . ~ ......... -i ........................... ' " ' ~ ..... D~bl.p_- ~ul~;di' .. ---'- ....... ~' ' ~ou,.c 2oua~ rio' J S I .~ ..... -, ' ....... ; . ..: . : .... : -:- -~. -. ..~ ................. Dal, e . . 2ou,c COUl Ho' · · '-~;a;~,~-,g t,,.~,,L .... :: .... ":""'4" ........ ; "' . . e9.~ ............ -:. _ _-.~' ..... '" ... . .i .... 3.. 2bu<. L,nu;;: I)1~"' .. d_:. !" ..... "' " ' -. D~;b,p~ ," D~-~,,u~ CeU~.,.,ui bm~b:,~. -.?. ~-~---. ................. PPF' ,.u~!unl~. b!b~ ,¢.c!b,.~¢o. ic.,q ot4c, L bin8 .'lO,~u: ^~,~ .... "~,u:' 14..~ 'j~'" b~ec~q'-u~ '~t'-qq'~..~' - W~I0' - ..... ^ainu's' ..... ~'i'-~ ....... PPi" b!b~' ~c!b~:olaq qnHu8 bn'mb!u~: )~,;"' .... '='-14o-r'~ ........ ~"?, ¢~".~:'~~' ' .....-"I ~ i: 00 ,, ,, ...... "' ' :f;O~.{~.?~'7~'~i'i~.~.. ...-~ _!-: 00 ~'s\~.'.,x'se . ............. :~ ............... i~(,laa~a ~te~:.:~L~ ....... .i ' '-0 ...... i .... ~c~[~,,q'bgi:~Ei68-~,.-,,,;~',~ ~ I · d0- ' 'l"S\Se\:e ' ' '.';" ...... :" '~ ..... ............. .............. '~;t" ~o~,, __ .q.,~. ~ 'o~ o,~,.~,~.~o,, c~*' co,o,, ~,'.!o,qf'a.]' i'.[i: ........ · .l_. . · ................ ............ bi~ IW~'l~X C EWE i-111-14~" I~OC E DI~B E BEWYBK2 .... ....... ~. .... _.~..~, _...,. ..... .i~:,.;.. . ;:-:.. _.-~, ;~... ....: ..... . . -,,.:,., .... . ~. ~... g !.- . · .:: . i ~ . ; . ~ ! ', ; : : . ~ .- ~ · , .'3 . ~ I : ! ~.,' ;: ' . : ,' , ! : ~.-'.-.o'.~-.; .-',~ : · _:. ; ' :,~ : · . : i'~.J ~ ..-,- ..~,~ · . . ~ : : :~- _='. - .:~ '.~ .... ~._. : - : . .'I/3; . ~--'- ' ..~ :- · , _._--.~ --i!;--' ~ :~ ' ' < i ' - :-,-,: _ ~ :, ; ~ j o., :---, - ' "- oio-!i~."'" '..'., -- ~ ...... L~_: ...... · ~. '.---i.. ~ ~ - ;-t ~,, · · c_; · ,'~.,,. : - :4..-,! m ~ ~).-. ....-' ~.,~.: --,; : ".~. ! w ' O' : ! ..j ~ ]' , 't.I I';~'; : - · · -4: cz: ' ,= c.': = ....... -~--F-.-i--: i ~ :.-~ . L_ ' x.~i i ': . ; ~ .~ ; 'c~ > · 4'.o ~ F~:' , 7}:> . ' . . j-- ~ -.~ · - .._;_..~._:_ ....... ~n ! "~ ~ ,~ '"' : i '-~ · ! · ; ' - : :~3 I ; , :0 ! i 'c: ' --~ : -, : ~ ! ' .o_....~ ' ~ .r,J ~: u , . ~ :~.: :oi"uhu,o- : ! o~ - ,'~ :..~ , :-~ .I.iJ : ! . 0 ! i ' ": ; : '"' ' h~i ' : i I ~ ~ ~: ~: ..... .... -:> i ! > ·; : : · i :' ' ia.,;-,~.~ · '--~ ! ~- :c.~ ~ !~> : - ~ i ~OQ.Q.,jQ, :.q ] ..< · ; " :~' o!r,,;r,,:r,,',-;./ ;- ~" 6" ! ' -' -~ -: · '~! ' - ' · l.-~o-c_~.'o:~!w i ~- -~ ~ ' · : I : i · ' -, ~ : : : : : : ~ b U .... i ! : · ' ' ; ' " 0 · : ' '---'-: --:' =-+ ~, ~ j I ~,, 9 u ~, u :- [ .-,, i ' j COWbVH'I'VWOCO bBODRCIIOH C( i ' ~:-' ~ ' =' ' --i-~ ~ '--se ".,.i~: ' · lB : ! J :'i · : '*-. , nl MErF' UI~Vl4~IE boil4/ '~ic:, , '~-" ~ FOC¥110~'~'~'TI~'I4 I / E bO 114J. · ~ e I'!~lq°~ . i>~!~:,~! I;-'~-~! ~n COI'IHIA' KEI4VI OOT$ · . · .o. , . !! !..! !!!~ !~! ! [ ! ! ! ! ! !!!N ! ! ! ! ! ! [ !~.!!'! ! ! !..u_'!! I ! ! ~! ! ! ! i = i i i i i-i i i i i'l i"l i l i l.i i i i i i,i t~g~;,~.,~ ,~gllI,Lllfll!,~llllfl..llilllllll TIN.~ll ! IIl.llll~,ll.il lllllll'.lllllltllll.~'lllllllllll ,l&lllllllll'lNllllllil, lllllll ll'llllll.ll[-.t',lIlllllll~Ililmllllll',l~ ~..l I I~ I I II '! T'lll ~IN Ii I ! I I I I1N I Ii I:.l II I I I ~l I I I I N I I I ~l I'i N,I I ~ I I I I I I~ll I.I'l I I I I.I I i I I I I I I I~l I'I I I I I I IJ ~l Ii I'll J~l~ ~TIN i I ~ Iii.Ill I.I I'H ~..I..i".'l t I I I' I ~ 1 I;I ~I I I I I I I~ I I I I I In I I I Il %11 fl I I II. I'll! FI It.~l I 11111 I~ I'l rtlJ i i~l I Illl I~.l.l"l I~llJ.~. i i i ~l'i I.I I I M'I I lllll Ill I N'I ! I I I I=l I I I I~l II I I'Vl ~,lll~ I I~ I ~N IZ~I'I I H'I'I II'~l ~l I"I:i I~ ti'l t.i-~l IlI=.,i 1111 ~l ITll I I I t Ill I Ill I%l~lllrl I'l · I I ~l I I I I I I I I I~l ! I Iai I I~ I I I i 11 ii i i i"l I"Flllgt I I I I~l~~lllil l~ i i i i'! i~l~ la ~l F,iI~ i i'.l i'l i.i i i~l i.ii'l..i.l'l.i I i Ii.i i i i.l'~l~l i.Li i l.ll I~l ~l i iil~i~l tl..i i..i i ~.~t~ ~ ,=l I ~'l I I' I I I.I I I I llll I. I I I I I I I I I I I I I I FI I/I I I I I I I I I I I I i I INI'I I I I I I I I I I I I I I I I I I t~i gl I I I I I I ~ I llll 'l..! I I I I I II'l'l :l 'l'~l"~l.l' I"l I'H l' I'l I ~ ~l-:l~ I~l I I I I I.! I~ il I i I I I'll I ! I I I ~Jll Ill'llllll Illllllllllllllllll!llllilllllllllllllllillll~ , ...i. o= ' .. i,., ' 'l..'"' IF .... ..... .... - ...... .... " , ,, , ', I ~ '" ~ ,, , i ' ' , ' ' ' .... ~ , ,, ,, .... , I.I.I lllTITFIIIilIIIIIIlIll FI I.I1N IIN~,..,..II I~l ~l JJll I~l~mll I~lllll LJ'ILLa, -~II'lTl I'l I'l ' ' ' ' "' ' -' .... , , , ~... _ . ~ :l'.l' I. I llilll Itl llll I:1 II, l,l',tllll:.l III.flail I,I I~ I.I(lJJ>~ ~ I'I'I~.I:'FI'I~I i.I ti. Ii. ti I I I I I I ~ r' 1Tr[' 'l:l::l.l~ I I'l'l'l i'! I'l'l.l~ I'll'l//l:llIlllllltlllIl/lll'll.~l/l/l~lllll I"~I'mTH'I' ~!~ ~~~'~ ~ ll/I.II'Il' I'llllll.l'll.I Illllll~li~llllllllll~ll. lil.'lllllllllll.lll IIlllllll Illlllllllllllllll!l ,~ Illl Illl Illllllll . ~ ..Il, Il'/. ' _ ... I,I Ill:l'lllIqllll. l'll'll, llll, l~ll, ll, lll'lllll, ll, ll Ill'Ill'Ill I l I~J'l I'111111.1'111 I...I I I I I I i I I.l.I I II.I I ! I I I:l I I I I I I I Illl I I I Lll 1Lll Illllll I.Illllllllllll!'lllI'Illlll!.llll II I Illlllll l I I. I. ill II. lll. I I Itllll. l.lllllllllll, lllllltllll. I II I Illllll' l I I Illl. l'l.l, lllltlllll.lllllll'llIlllllllll, llllill II Ill lil, I l L I I I I I I~l'l.I I I..I.I I IllIIlll'lfl. I Illlllllllll. lllll I I I Ill.I I~l. I Il I'l.I II III/I I'l I I I.'l I I I' I I II'l.ll'l'll'll I I I'l I I I I I Ill I I II II I Ill II Illl I Ill I I~' ' Ii- I Illllll!l.l'lllllll I I/ll.l'l Ill'llllll'lll I I ! II Illlllllllllllll IIll-t Itll:l',,-II II I" I'l I' I I:l lil'l I~lll I'l I I~l'l I'! i I'l'l'l I.I I I.I I I'l I I i'l.l.I I Ill I I I I It I I II I I Ii I./l I..I I.'l I I ill l Ill~'llllll. ll.'lIlllll'lllllllll'lllll/'l'lll Illlllllllllllllllllllllll I Itlllllill' II I Iil II tl I I I'1111 I'. ,, I I I I I'll I'l Ill I I I I I 11111111 Ill I I Ii I I I I II I I I II I III, I I I IllJl I. . . . ... . Illll'Iilllllllll/ Ill"'l"lll..Illlll"lll'llllllllll II'llllllllll. ll,ll.ll~l.llllllIll 41111Lll I I I I ii I i I l I I I.Ill ! I I il'! I I,l:l I I I I"l I I I I I Ill I I I I I I I I I I I I I i. II i'.rl :llI.I Ill lilt .... ~ ' L .... [j .... llll'ii..'-i_ii'i.i i I i'ig'-..I.L.I.J.'J,I i~[lJ.i~.l. IL.l lil.i.J.I 'llilL_l,t~LI IJ...ll.ll:l ,l:Lli. l::l:Ai IIILJ " j: IlL j.,,I,,ll.l,I ,,,,,l,,l,l,l,,I,l,,,,I IjjilJ. L i~ I_LLLI_II .iii I1.1 ,II 1'' ,,,.,IL, I.. ' .'!.. ~ Ii'Ir "'"t", ..... :i_' lJl'-~ ~J~ ": ; ...... ~ ,. '~ ~ ii I'l ll'l .. ' :-.l'l'l Ii J J' ". ,~ :i ~.' ~ l'l'-I ;--~ i-I"! I ., _ "l'JI !:-" ~" ~ ! J' I'i' ",'-'?: .. 1'1' I11 I ~', ..,o.. ...... . . ~-~~- , ' I ]'l l'l [1 I, ! II'll'l~ll~lll-l.1 I' ? 1~ ,;_ -~.. ']"J I I' I'J'l I ~' 1 l'lll- !i !:'i~ . ," ~i ,.l.~, J "J~,~,JJ.JJ.I ,,'J..J~J.J".J..J' .l'JJJJl] /~~"".~". ,JlJ~;,!J'JJI' III. 1'1'.1.;~,," .... '~-,"IrT:l'J~.l.l'~ "I'1~11 ~-~.LI,LI.! ..' -' I1'1 .I~ I '~11'1 '"'. rl'.'l'll, r,~iTIIl, llll .tllllll.ll~,:w 'l.ll-m'l )IiI1TF /I. Illl'l IlIIl. II '1.1. III, III III1~ IIl'rrll"'lJJlJJJj IllII1' Illl 1.1'1Iii111 I..ll'lll.'l'l.I I..I.l.l.llllllllr, Illllll !111111 IIIIII1' IIit1'.11 II ................................ · ~ ... ~ .--,~ .............. . ........ ~. ...... . . oose I l I_LI. I.IL I 1 I I. 1 l I .I i. I' l I.. ti I i_1.1 l I, 1 L l..i.i 1. l I I i I i 1[1.. i 1. l I i 1.1 .ILI'LI,I- I_ l 11 l I I 11 I_1 1.1 I I 1 '1. id. l.J I I 11.1..I I l .I I I t ! ~ 1 _l~l.I ..... 1-11~1.I- .I i: 1 Ii i i I-1-I ! pl--[l I1 i-! i 1 .... I I.I-111 I[llT.iI,i-i i--1i!-i.!.1111 I-i.I1 I.~11,11111111.1.1..I i / i i ! i i i.i.1 II.I I I],~_1111 [ I I I I I I II I I I II1111 I'l I I I I.¢I1~111111 i I I I I I I:.11 I.I I.I I I.l.ll I II['l I I I I I I!1111 Illllll I I I I L~I I I'~d'.Lidl, L' !' 11.1L~~t~.L],,L~{ r, li,~,l'tO~J:J.l,lLl"l:l-K.l"l' [I'~1,1'~40. LI, i..I.3~11LL I.L.I 1. I~1 FI! I I I ! 1 I-!'1'11'I I-tr-~l'l"l' i I I I I'1111'FI'I I FFI I'!!1111111111~Fl I Tli':! 1~t II'I'TTI I I I.I II1-11'I~111 l%f'll FTI"~i'I 1111t11111111'1111111'11:1111'1111111111111'1111111'! I IIII I1111111'11'111/11.1111111111111111111111! III!!11,11 IIII1'1111IIIII1111'11111'1__111,'~1.1]111111111.1.1,11 Iltl I.[IIII"I:IIII'IIILIIIIIIIIIIIIIIIIIII, ~fi~ . ~ .~, ~ ,,~ ' ~l,i ~--~ .~ ,:, ' ~' ~ -' " ' ~ / _ . ~ ~ t , , ,~ ~, .,,,--~:~..-~..... ... :..._ . ~,, , ~~ , ,,, ..... ~'~'~~~'~ ..... ~ .... · " ' . . ~ ' ~ .' .......... ~ ........... ~-:- ~ ,., ~*~ '.-.~~t~ ~.'.=~-- ' ....... =--~ ' ~ ....... ~-~ " --~~ .... . ........... · . ,~. . .. '~ , _, __-- . . . ,,~..,. ~.~'.. ~ .... ~....; .... ~ ........... ~.~. . .,,tl,~. f . . .~ i. : ' ~ ' '., , I; · ;"+'t '' ..... J-t-~"~ :j -. ,::..% · ~ , I ' I ' ' ' ~ ' ' :Nl'li .',~i !ll'lll'llllillllllllJlili~'ill~j~liull','uLIJ liil~ltl.llJi._iJ~lil'iilLi'llJlllliilli'lil'ill:ill:/iiilli, llilll/J'lilllll llllillllllililll:ll-ll.iilill Ill"i'i'l .j t4 . ~'~ .. , _ ...... J ...... I _ II! ..... Ill ....... !11! ~1 ............. I~li.l_ . '~ ~ t. ri ~: i.l"I..LJJ_~[.i.ki i i i i ii i~~~h_~iNH ~~LN::ffi:i-i-i i;Fi i-ii'i-i-fi--i-i-i:[i'i-,, i i i,!11 I11-1iiil1i[Ii-itrq i H'"L1 ~..~tllF~l~i~~l~~l&llli'ltllli.lll~ ~~~~5T~F~~~~~~~}~r~~.~.~.~~.~~ IIFII III I1 ~ I ' ,~..'i~l['~[lll~lllllffi-[lllllllllllllllllllllll~l, tltl,~'ll '111t1'111,1111[.11111~11~-~11I!1t111 lllllll'l'lllilllllllll~llllllllllli,'ll,ll~lllllllllllllllll):ll 1~ ..~1.i ~,llllllll. lllll.~lllilllllllllllll.llll~rllllllll Illl.lllllllllllll'lllllllLllllll~l I['l[l'lllllllll~l~'[l~[ll~Ilillll~ll~TIIIIlT[lllllll[ I~ 'Ill! ~ill!llllllllllllllllilllllilllllllllllllllllll ~l~l~l.l~l~~-~l~.l.~~l~l~ll~l~ll~~l~l~I ~', '! i'~1 t11111 III I'11111111 IIIIIIIIillllllllllll' IIIIII IIII1.111111111'1111111111111111111'11 IIIIIIl!1111111111111111111'11111111111111111'11~1.'1 III1'I' I'1t1'1'1 ....... . im i ,0 ,CZ. .¢.'~ 0 ': , 'SL~ ' 7-. m · o e, i:'i 'I~[.ULLLI'tlIIIIIlIIiI' l~lllilllllllltlillllill".:llllllll:l'l'llll:l.tt'll.llt'"q- o~ . ,~ 1:' :,I!'I'FtTFFFFI~I.I I:11111111111111111'111~!1t.!~111.1~1.111.1:1.1.1111.1-1.1t1.1-1~., ..- ~,,~-_ ~, · I..'i t ~TTTTTI i-~TI'] I ! 171111111111111111. I.'1~111 q~l I I I I 1.1.i! .l I I I'1. IIIII If · ~"~:.. ~,, .~ ., ~ ...j..' ~ ii'iTffl'l--I'll-L~l-r"l 1 i I I I I i I I I I I I'1 III I I i 11.:1~111i'!1,1.I~1.1'11 i I:1'1'-I I I.I1:11 Ii I I il I't:- ~.~.~'~'~ .~,'= "' ~1 lllll, llllllllllilIl~_ill, i'lllli'i, ilill:llll':llll:iltJ.ll'iF · '" °c ' ~ :..i '''~ ~¥EffFFrFEqIT~, I '111111111.11111111I 1.111~i I.l!rl.I I.~'1"111 ! i'1 t'111't'1't'1'1:11'i1'1 [ ,~ .~ ~ ~ ~ ,.~ ' ~..!. ,~.E]~I.III III!111111111111111.1.'1tl I'1 !1'i1,111111~ Iii11'11 II1:11111 li- , ~. '.,.'.~-' 'R ,.'-..' ' - ,]..[..1,L]]ZE]]~I I.II I III!111 IIIIIIII I'1.1 l".r[I i.!.ii ! ! tll I ! I I.I I'11i~11 l.:llI:l I I I ! I,F ~.:~ ~ ij'.~. ~o :::. 1.,.,. ]J;]JZJ~'[I¥IIT1-'I I I I. I i I I 1111111 I!1111 I..I I!.i.111 rill Il I'11t I I I 1~111'.H,I I I I l..i'l:.i ~.' ':'" ":~ ~ ~~..I.t:H.II.~tI....W4~I"~ :,., ~, _ I I'i.I i . .., I.f 1 ... ,_[.....I~ r:: ~,,..,...r- !- ~ ~.¢- .[ . i - ' ~' !' ..... :''' ' -.n": ,' ':' ,::'", '!i ''' '' ........ .. · , ~,,,', .., 7 ........ "l' '! !1111 .. .~ ~,,..,,,~.. JT i1' "(': .... -.I.t-.44-.-'-.-!-.~::! ..... :.:~-'.-.-- -: .......... -:- ........ ' -i , ........ "' .... :I:! ,..~ ...... ,_:_.., ._.'"'-" i ,~ "'~ "'-:-~' !.i :" 111'111111111111111111:!'1'II1~!!!!ill ~..-!_~ ..... ,._._ ._..~L.'.~,":'., ~ !l.J, ill'Uq".q-rl---:.'"'id?-:'!'": 'l.~'"iI I'!l'lltlll!ii~ttllll II1' IIIIIIIIlllllll'll'llil'l, lllllll I'1 .... :,,, i..~ :..u .. I.~;.::1'~:11.1,-.=:..:..:_. ~'-~_::::' _ ..... : .... ~ , . ~ I1~ ... ,. · . .-- ,: ,]: I. IJ_LLL L. A. Darsow Area Superintendent February 16, 1977 File: LAD-128-WF Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Amoco ProductionCompany P.O. Box 779 Anchorage, Alaska 99510 Dear Sir: Re: Monthly Report of Drilling and Workover Operations Granite Point 18742 Well No. 26 Please find attached State of Alaska Form P-4 summarizing drilling operations on Granite Point 18742 Well No. 26 for the month of 3anuary 1977. Yours very truly, L. A. Darsow Area Superintendent Attachment Form No. P-4 REV. 3-1-70 ,, t' SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS S. AP! NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADL 18742 WELL WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Amoco Production Company Granite Point 18742 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779', Anchorage, Alaska 99510 26 4. LOCATION OF WELL Leg 4, Slot 8, Granite Point Platform Anna, 771' FNL, 713' FEL, Sec. 12, Ti~N~cEIv~DR12W. S.M. 10. FIELD AND POOL, OR WILDCAT Granite Point 1 !. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 12, T10N, R12W, S.M. 12. PERMIT NO. 76-77 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING-AND ~tl~NTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY' OTHER SIGNIFICANT CHANGES IN HOLE CONOITIOf~/~ .... Cl'[ (~il &l'lCJ Gas 0oim~rvation January 1-3: Drilli~'~ air~~l hole, TD 10,860'. January 4-5: Coring and logging hole, TD 10,860'. January 6-8: Plug back, set permanent bridge plug at 10,310', verbal approval given to Bill Halvorson from Hoyle Hamilton 1-6-77. January 9: Perforate well at the following intervals: 8216-8266' 8680-8744' 8270-8296' 8975-9000' 8307-8340' 9485-9530' 8469-8589' 9540-9795' 8637-8660' 9888-10,045' PBD 10,310' January 10: Run casing scraper,.PBD 10,310'. January 11-14: Run 3-1/2" dual tubing, PBD 10,310'. January 15: Rig released 0800 hours, PBD 10,310'' January 16-18: Hooking up production piping and Kobe manifold, PBD 10,310'. January 19-20: Well not pumping, wireline out standing valve, PBD 10,310'. January. 21-25: Run new standing valve, pump on test, PBD 10,310'. January 26-31: Well shut-in, waiting on rig. 14. l hereby certify ~j: the foregoing is true and correct SIGNED ~/~,'"' .......~F'~.~,~ ~__ TITLE__Area Superintendent DATE February 16, 1977 NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. January 14, 1977 File: LAD-056-WF Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Monthly Report of Drilling and Workover Operations Granite Point 18742 Well No. 26 Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 Please find attached State of Alaska Form P-4 summarizing drilling operations on Granite Point 18742 Well No. 26 for the month of December 1976. Yours very truly, L. A. Darsow Area Superintendent Attachment RECEIVED JAN ! ? I 77 Division of 0tl and gaa COnae~ation Form No. P-4 REV. 3-1-70 ..  IN DUPLICATE SUBMIT STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADL 18742 1. OIL ~] GAS ~] 7. IF INDIAN'ALOTTEE OR' TRIBE NAME W~LL WELL et. ER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Amoco Production Company Granite Point State 18742 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Al( 99510 26 4. LOCATION OF WELL Leg 4, Slot 8, Platform Anna, 2900' FWL, 900' FSL Sec. 1, T10N, R12W, S.M. 10. FIELDANDmOL, ORWIL~AT Granite Point 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 1, T10N, R12W, S.M. 12. PERMIT NO. 76-77 13. REPORT TOTAL DE~H AT END OF MO~H, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DE~H SET AND VOLUMES USE~ PERFORATIONS, TESTS AND R~ULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Status as of November3D, 1976 Fishing at 8853 December 1-4 Fishing December 4 Set cement plug at 8675' December 10-12 Stuck 9124' December 12-20 Drilling TD 10,344' December 20-24 Lost circ December 24-25 Logging IES,. GR Sonic, GR Density, and dipmeter 10,336-8000' December 26 Set 7" liner 7728~10,338' w/750 sx C1 G December 27-31 Drilling TD 10,683'. RECEIVED JAN 1 71;?? Division of 01t and Gas Co.;ervation 14. ! hereby c~ti~t~he~alt$~, true and correct Area Superintendent January 14, 1977 TITLE DATE NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed. 02-001B STATE of ALASKA Division o:f Oil ant.! Gas Conservation TO: V ~.,~ELL FILE FROA/b Hoyle H. l!ami lton//~ Director DA?E , January 7, 197~ · SUBJECT: .Amoco T:~ell No. 26 Granite Point Field[ Bill Halverson,, ~/oco, called January 6, 1977 to repor~ they have drilled a 6" hole from base of 7" liner at 10,336 to 10,860'. Tested top 200' of this interval and. recovered only 10 bbls. of mud. Cut core in bottom and recovered mostly shale at dips between 80-85o. Logged and found only one s~a.ll tight sand in entire interval. No pay indicated. I gave him verbal approval to set a bridgo plug in'bottom of 7'' liner and proceed with the remainder of their program which calls for COmpleting in C-3 through C-7 sands at selected interval~s. HHH: be G. J. Ross Area Superintendent December 29, 1976 V4 f.- Amoco Production Company P.O. Box 779 Anchorage. Alaska 99510 File: GJR-973-WF Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Notice of Intention to Change Plans Granite Point State 18742.Well No. 26 Permit No. 76-77 Reference is made to telephone conversation between Lonnie Smith of the Division of Oil and Gas and. Bill Halvorsonwith Amoco concerning the captioned well. This will serve to"document that conversation. While drilling 8-1/2,' hole at 10,344.', lost circulation was encountered. Amoco logged and set a 7"9 26# N-80. liner at approximately 10,336' with the iiner top at approximately 7727.'.. A 6" hole will be drilled to a total depth of 10,700' (9962' TVD), logged and tested. If productive, a 5", 18# N-80 liner will be set at TO and hung from approximately 10,050' in the 7" liner. The liner' will be cemented in its entirety to cover all pay. Operator also proposes to drill to 10,700,' rather than 10,500' in order to penetrate the entire C-8. This well will be the only C-8 producer in the southwest quarter of Section 1, T10N, R12W,'S.M. Attached for your approval is a completed Form 10-403 outlining the above change in plans. Yours very truly, Area Superintendent Attachment .,. o 0 t9'76 DN~SION OF O{[ At, iD GAS Form 10-403 ( Submit "1 ntentions" in Triplicate REV. 1-10-73 . & "Subsequent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 5. APl NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADL-18742 1. OIL [~ GAS D 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELLI~Y~J WELL OTHER 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME Amoco Production Company Granite Point State 18742 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Alaska 99510 26 4. LOCATION OF WELL Atsurface 771' FNL, 713' FEL, Section 12, T10N, R12W, S.M., center of Leg 4, Slot 8, Granite Point Platform Anna 13. ELEVATIONS (Show whether DF, RT, GR, et~) 105' RDB-MS[ 14. Check Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND POOL, OR WILDCAT Granite Point Field 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 1, T10N, R12W, S.M. 12. PERMIT NO. 76-77 3orr, or Other Data NOTICE OF INTENTION TO.' TEST WATER SHUT-OFF ~ PULL OR ALTER CASING L_~ FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR AClDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other). SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAI RING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR AClDIZING ABANDONMENT* (Other) (NOTE-. Report results of multiple completion on Well Completion or Recompietion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. While drilling 8-1/2" hole at 10,344', operator lost circulation. Operator logged and ran a 7", 26# N-80 Buttress liner at approximately 10,336' with liner top at 7727'. A 6" hole will be drilled through the C-8 to approximately 10,700' MD, 9962' TVD, logged and tested. If productive, a 5", 18# N-80 Buttress liner will be set at total depth, hung with the liner top in 7", 26# casing at 10,050' and cemented in its entirety. Collapse safety factor at TD will be 2.25 with 9 ppg mud. Operator proposes to drill to 10,700' rather than 10,500' to penetrate the entire C-8. DIVISION OF OiL" ,~'. ,,~0 GAS SIGNED _/~=.IK..~3~ ~ ~' -w (This space for State o ce use) TITLE Area Superintendent DATE December 29, 1976 A PRO ED BY . TITLE CONDITIONS O~'~"~OVAL, I~ Ah%;.. ...... See Instructions On Reverse Side Approved Copy Returned Amoco Production Company P.O. Box 779 Anchorage. Alaska 99,510 G. J. Ross Area Superintendent December 15, 1976 File: GJR-941-WF Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska. 99501 Dear Sir: Re: ..Monthly Report of Drilling and Workover Operations Granite Point 18742 Well No. 26 Please find attached State of Alaska Form P-4 summarizing drilling operations on Granite Point 18742 Weil No. 26 for the month of November 1976. Yours very truly, George J. Ross Area Superintendent Attachment Form No. P-4 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WELL WELL OTHER 2. NAME OF OPERATOR Amoco Production Company 3. ADDRESS OFOPERATOR P. O. Box 779, Anchorage, AK 99510 4. LOCATION OF WELL 771' FNL, 713' FEL, Sec. 12, T10N, R12W, Center of Leg 4, Slot 8, Granite Point Platform Anna 5. APl NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADL-18742 7. IF INDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Granite Point State 18742 9. WELL NO. 26 I0. FIELD AND POOL, OR WILDCAT Granite Point Field 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Section 1, T10N, R12W, S.M. 12. PERMIT NO. 76-77 13. REPORT TOTAL DE~H AT END OF MOTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DE~H SET AND VOLUMES USE~ PERFORATIONS, TESTS AND'R~ULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICA~ CHANGES IN HOLE CONDITIONS. Status as of November 1, 1976, Turbodrilling at 6427' November 1-2 TD 6427' Turbodrilling November 3-12 TD 6535' Drilling November 13-14 TD 8211' Condition Hole November 15-16 TD 8211' Logging November 17 TD 8211' Run 9-5/8" 40# & 43.5# S-95 buttress casing to 7985'. Cement w/700 sx Class G November 18-29 TD 8853' Drilling November 30 TD 8853' Fishing DIVISION OF 0~'~. AND GA5 SIGNED: ~-~----~~ //, /~2~-~~. Area Superintendent December 15, 1976. . TITLE ~ DATE., NOTE--Fleport on this fo required for ench cnlendnr month, regerdless of the stntus of operations, nnd must be filed in duplicnte with the oil end gns conservation oommitt~ by the 15th of the succeeding month,unless otherwise directed. G. J. Ross Area Superintendent November 16, 1976 File: GJR-857-WF Amoco Production Company P.O. Box 779 Anchorage, Alaska 99510 Mr. Hoyle Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Notice of Intention t° Change Plans Granite Point State 18742 Well No. 26 Permit No. 76-'77. Reference is to your letter of October 13, 1976 granting the permit to drill the above referenced well at .a location in Section 1, T10N, R12W, S.M. Subject well was Spudded'on October 19, 1976'. While drilling 12-1/4" hole at 8211' MD on November 10, 1976.,.lost circulationwas experienced. The resultant drop in fluid level allowed water and gas to enter the wellbore and well control was possible only after spotting lost ~irculationmaterial and a 50-sack cement plug near the bottom of the hole. In order to prevent future influx from upper zones, Amoco proposes to log and set 9-5/8"intermediate casing at approximately 7975'. An 8-1/2" hole will be drilled'to total depth and a 7", 26# N-80 liner will be set at TD and hung from approximately.7700' in 9-5/8" casing. The liner will be cemented in'its entirety to cover all pay. Operator also proposes to move the target location at the top of the C-8 sand 500' due west from the location for which this well was per- mitted. This location is expected to.be' 200' vertically deeper on the west flank of the Granite Point structure. It will allow for more efficient recovery of trapped oil from the western crestal and flank area. It will also assist in the geologic interpretation of the west flank of the structure. This well wiI1 be the only C-8 location in the southwest quarter of Section 1, T1ON, R12W, S.M. -2- Attached for your approval is a completed Form 10-403 outlining the above changes in plans. Yours very truly, George J. Ross Area Superintendent Attachment Form {0-403 (- Submit "1 nten tie,r," In T ripilcate (.. REV. 1-10-73 & "Subsequent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to clrill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 5. APl NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADL-18742 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 1. ~/~kLI~l C'AS ~] OTHERWELL 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME Amoco Production Company Granite Point State 18742 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, Alaska 99510 26 4. LOCATION OF WELL At surface 771' FNL, 713' .FEL, Section 12, T10N, R12W, center of Leg 4, Slot 8, Granite Point Plat- form Anna 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 105 ' RDB-MSL Check Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND POOL, OR WILDCAT 'Granite Point Field 11. SEC., T., R., M., (BOTTOM HOLEOBJECTIVE) Section 1, T10N, R12W, S.M. 12. PERMIT N.O. 76-77 ~ort, or Other Dafta NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* 'REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT oF; WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING, SHOOTING OR ACIDIZJNG ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent d~tes, including estimated date of starting any proposed work. While drilling 12-1/2" hole at 8211', operator lost circulation and ex- perienced water flows accompanied by gas from upper zones due to the droP in fluid level. Operator spotted lost circulation material and a .50-sack cement plug at 8040" and controlled influx to wellbore. Operator .proposes to log and run 9-5/8", 40# and 43..5# S-95 Buttress casing at approximately 7975'. An 8-1/2" hOle will be drilled through the C-8 zone to approximately 10,500' MD, 9938' VD, and a 7", '26# N-80 Buttress liner will be set at total depth, hung in 9-5/8'", 43.5# casing at 7700' and cemented in its entirety. Collapse safety factory at TD will be 1.17 with 9 ppg mud. Operator proposes, to change bottom hole location at the top of the C-8 zone from 900' FSL, 2400' FEL to 900' FSL, 2900' FEL, Section 1, T10N, R12W, S.M. The C-8 top is expected at 9100' TVD, or 200' lower than the original location. The new location is desirable in that it provides for a more efficient trapped oil recovery f~ ~ .~~.t~f~-z~ o.~.~che Granite Point structure... '. 197 16. I hereby cerlfy that the foregoing Is true and correct SIGNED . j..,~_jr. ~] .... Area Superintendent '';' November 16, 1976 DATE ' (This space for State office use) CONDITIONS OF OVAL,'I ANY: See Instructions On Reverse Side Approved c. op/y Returned , -- , . Amoco Production Company P.O. Box 779 Anchorage. Alaska 99510 G. J. Ross Area Superintendent November 10, 1976 File: GJR-842-WF · Mr. Hoyle Hamilton, Director Division of 0il and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501. Dear Sir: Re: Monthly Report of Drilling and'Workover Operations Granite Point 18742 Well. No. 26 Please find.attached State of. Alaska. Form P,4 summarizing drilling operations on Granite'Point 18742 Well No. 26 for the month of October 1976.. Your~ very truly, George J. Ross Area Superintendent Attachment Form No. P-4 . ( SUBMIT IN DUPLICATE ( REV. 3~ 1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS S. APl NUMERICAL CODE 50-133-20297 6. LEASE DESIGNATION AND SERIAL NO. ADC 18742 1' OIL [-~ GAS ~ 7. IF INOIAN'ALOTTEE OR TRIBE NAME W~LL''~ WELL'' OT.ER 2. NAME OF OPERATOR S. UNIT FARM OR CEASE NAME Amoco Production Company Granite Point State 18742 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 779, Anchorage, AK 99510 26 4. LOCATION OF WELL Leg 4, Slot 8, Platform Anna, 2900' FWL, 900' FSL Sec. 1, T10N, R12W, S.M. 10. FIELD AND POOL, OR WILDCAT Granite Point 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 1, T10N, R12W, S.M. 12. PERMIT NO. 76-77 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Status as of October 31, 1976 turbodriliing at 6266'. October 10-25 Spud October 19, 1976. Previously set 0-600' 20'; 2022' of 13-3/8 casing. T.D. 5522' Mud 8.9# Drilling 12-1/4". October 26-31 T.D. 6266' turbodrilling. 14. 1 hereby ~'e]riify that the foregoing/~t~ugnd correct TITLE Area Superintendent DATE 11-10-76 NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month, unless otherwise, directed. 02-001B 'STATE · to: I'-- Thru: FROM: iZ., DEPARTMENT OF NATURAL RESOURCES Division of Oil and Gas Conservation Hoyl e H. Hami 1ton Director Chief Petroleum Engineer Ben LeNorman Petrol eum Inspector DATE : October 21, 1976 SUBJECT: BOPE Test, Amoco GP-26 P1 atform "Anna" OctobeK 18,. 1976 - Departed igy.., home at 10:00 AM ..for. a 10:30 AM showup and ll:OOAM departure via A,A.1. ~;wiln otter .for Kenai. Departed Anchorage' at, ll:lO AM, arri'.ving in Kenai at ll:40 AM where I rented, a car and drove. to tl~e Amoco-Shell. heliport, l,arrm..iving at ..12:15 PM.. Departed..the heliport. at 12:25 PM and arrived on iP..latforlll "Anna" at 1211:.40 .PM where I. was met by. Baby Can son, Amoco drt 11 tng forenmn,, and Ken..Dennington, .Parker..Dri 11 ing.. Company toolpusher .......... . ....... .Barney Canson advised they 'W.°'.U.'.]d. pressure up wi.th .the.T, lO Hal l.li burton pump using clear, water inasmuch as .the. pump house had.not .been skidded ,and., no mud mixed. He further advised they.were having problems with leaking swivel packing and' the test p.lug would .not .seal due to corros.ion problems in the bowl of the OCT castn.ghead which was installed in 1967.. We. toured the rig' which was' i:n good .repair, the ..well, sign was .'up and: general housekeeping was good..... Accumulator pressure. Was...2600 psig, N2 backup bottles tested. 1400, 2'200, 1850, 23001a'nd' 7,00. psig... ACtual tests, began at 2:30 PH,...b.ut sw't. ve.]..., packing ..p:robl..ems..c.ontinued to plague u.s. By 5::t5 PM 'the .swt..,vel..problems. had :been..corrected .andl the..kelly cock tested to 3000 pstg. 'By .8:.00 PM,.: with the .:use..of bar. i.te:,, we. finally .. .gOt the test plug to s.eal and .the upper pipe rams.,... HCa. valve on the choke ' line and. wing val.ve on the kill., lin.e tested te...3OO.O..pSig...Hydrt.1 .tested to' 1500 psig. Lower piPe rams,, blin.d, rams and.:..;check.Valve ..on.. the kill .line tested to 3000. psi. g. Te:n plug.va, lves and .forty.-eight fTanges in the ...., .. · .choke mantfoid ..we're. tested to. 3000. psig.. The...~Cameron.. automatic..choke was .actuated and the manual adj.uSta'ble .choke was free moving .... Lower kel.ly va. lve and kelly tested to 3000 psig..Both., dart and. bal. l..type plug valve .... .. Were in positi.on at the dra~avorks. ,Final],y,l: the ~13,3'/8". casing, was tested. to 1000 psig and tests were concluded at..ll:O0 PM, '..i. A field inspection report waS,prepared w.i.th the...or.t..ginal ..ooi.ng to Barney .... Canson, a copy mailed to Bt.ll.. Halverson., and :a..copy l.a.~:tached .to this report.. October 19, 1976 -'Departed' .~lamtform ".Anna" a.t...8:3D.AM and .arrived at .. A~lO~b'LS.hleil he-TiPort at 8:45 .AM, Departed .hel. iport at 8:50 .AM and arrived at Kenai Airport at 9:10 AM., .... Departed. Kenat..v~a.A,A.I..t~vin...otter at .... 10:35 AM, arriving in Anchorage at ll :0§ AM .and at my .home. at l1:35 AM. in sun, nary: I witnessed su¢~'essful BOPE ..test and testing of 13 3/8" casi. ng. on. ~CO ~P-26 Platfom "Anna" ...... Attachment Ala. Oil and Gas Conservation Con, nit '- . ..... Field inspec_tion Re~ort .... . Drlg. Permit No.?~;-~ ~~ Well/platfm sec_/ Operator y~.~.~_~-.._~ Represented by ~^~.~.,y Name &' Number ~..~C)%-~ Satisfactory my~e~ ~nspec~l on~ J~u~ ~, ~u uury . Type Inspec~l on ii Yes No Item (~)~'Location,General- Yes No Item (~BOPE Tests (~)~ ( ) 1. Well Sign (~ (') 15.-/~,~'~CaSingSet @ :,~~ . ..~: (:.)~ ( ) 2. General Housekeeping (~,)~ ( ) 16.' TeSt f'luid-(~q~Ft~)mud-( ) oil .'i ( ) ( ) 3. Reserve Pit-( )open( )filled (~.)~() 17. Master Hyd. Control 'Sys..-_~sig (~)~" ( ) 4. Rig () () () () ( ) Safetj/ Valve Tests 5. Surface-No. Wells 6. Subsurface-No. Wells ( ) Well Test Data ( ) ( ) 7. Well Nos.__, ,__, ( ) ( ) 8. Hrs. obser__,__,__,__ () () 9. BS&W 198.I _N. 2 btls,~, ~~j~,t~, _,q~PS]g 1 . Remote Controls · (-) (~'() 20. Drilling spool' ~"Outlets' -~~'~]i (~-~ ( ) 21 ~ Kill- Line-(~rCh6ck valve ()~)~ ( ) 22.-Choke .Flowline-'-'(~/'~HCR valve (~ ( ) 23. Choke Manifold No-." valvS/~-fl~s .Y~J~' (~.() 241.. Chokes-(~)~emote( )Pos.(~d.i (~(). '25.. Test Plug-(~)~ellhd(')csg( )none ( ) ( ) 10. Gr. Bbls. , (~ ( ) 26" Annular'Preventer~~sig ( )Final Ab-~Jndon~ent -- (~ ( ) 27' Blind Rams',~_~pslg ( ) ( ) ll. P&A Marker (~)~() 28J Pipe.Rams .~)~psig (.~,) ( ) ( ) 12. Water well-( )capped( )plugged (~)~() 29' Kelly & Ketl.y-cock~psig . ( ) ( ) 13. Clean-up (bJ~: (')-' 30~! Lower Kelly. valve~si? ( ) ( ) 14. Pad' leveled . (~)~ ( ) 31-.~ safety FloOr val'ves-(~q)V-,-~l~art Total inspection observation time ~x hrs/~i~ Total number leaks-and/or equip, failures Remarks .... .-.. days or when ready _ __ . _ Inspected by ._. .,., Date?~_,~./_../~ ..,:. ~ . . October 13, I~)76 Granite Point State 187~,2 No. 26 Amoco Product ion Company State Permit No. 76-77.. George J.. Ross Area Super I ntenden t Amoco Production Company P. O. aox 7.79 Anchorage, Alaska 9~510 Dear S! r: Enclosed Is the approved apptlca, ti'on f°r.permlt to.dri1.1 the above referenced well at a ~.ocatton In Sect'ion I, To~ns'hlp ION, Range 12~/~... So I~. ~/el! samples, core chips a.nct' a. mud. log are not requ~:red. A directional survey Is required. Finny rivers In Alaska and their dral:nage systems .have.been c]a.sslfled as important .for the s~l.m3 or migration .of anadromous f~sh..: Operatl.ons I.n these areas are subj~ect 'to AS 16..50.870 and the .regulations promu, lgated thereunder (Ti'tie 5.~ Alaska. Admlnist.r. ative Code) ...... Prior to comaenclng operations you may be. contacted by t.he Habitat Coordlnator~'.s offi..ce, 0epart- ment o.f Fish and Game.. Pollution. of any waters of the State is prohibited by AS q~;, 'Chapter 03, Article 7 and the reg,ulattons..p'romulgated thereunder (Title '18, Alaska Adel:nis. tratlve Code, Chapter 70) and by the Federal ~/ater Pol.lutlon .l:ontrol Act., .as nme.haled. Prior to: coeemnclng operations you may be .contacted by a representative .of the Depar..tment .of Envi.ronmenta! Conservation. Pursuant to AS 38..40, Local Hire Under State Leases, the Alaska Department of Labor Is being not'lfled .of the issuance of this permit to drlll... To aid us In schedullng fieJd.~ork, we ~ould appreciate your notifying this Offlce within ~8 hours after, the well is spudded. We would also like to be notified so-that a representative of the Olvlsion may be present to .witness tes. ttng of 'blowout preventer equipment before 'surface cas. lng shoe. is drilled. G. d. Ross 2- October 13, 1976 In the event of suspension or abandonment please give this office adequate advance notlficatlon so that we may have a witness present.. Very truly yours, Hoyle H. Haml I ton Cha i rman Alaska 011 and Gas Conservation Committee Enclosure CC: Department of Fish and' Game, Habitat Section w/o encl.. Department. of ,Eev! roneenta! Conservat'! on . w/o. enc.l. Department of Labor., Supervlsor, Labor Law Compll.ance Olvislon w/o Amoco Production Company P.O. Box 779 Anchorage. Alaska 99510 G. J. Ross Area Superintendent September 29, 1976 File: GJR-729-WF Mr. HoyleHamilton Division of Oil and Gas ' Department of Natural Resources State of Alaska 3001' Porcupine Drive Anchorage, Alaska 99501' Dear Sir: Re: Application for Permit to Drill Granite Point State 18742. Well No. 26' CONFER: FILE: Attached is a completed Form 10-401', Application for Permit to Drill, for. Granite Point State 18742 Well No..'26'.~ This well will be drilled from Leg 4, Slot 8 on Platform Anna to'a target'location at the'top of the'C-8 zone at 8900'!..TVD, 900"' FSL, .2400"' FEL, Section 1, T10N, R12W, S.M. All zones through the'C-8 will be'Penetrated to allow log evalua-. tion, and the'well will be'selectively perforated, and stimulated if necegsary. This well is required'in order to'recover trapped oil and to improve conformance from the' Crestal portion of the' Granite Point struc- ture. We hereby' request administrative approval of this location as the well will belthe'fourth Completed'well in the' SE 1/4. of Section 1. Also attached is a draft in the'amount of $100 for the'filing fee, along with a BOP sketch and a plat of the Granite Point Field. We anticipate being in a position to spud subject well during the week of October 10, 1976,.' Yours very truly, George J. Ross Area Superintendent Attachments' Form 10-;01 ' REV. 1-1-71 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN la. TYPE OF WORK DRILL ~; DEEPEN ["-] b. TYPE OF WELL OIL [] ' GAS .[~ %~ LL WELL OTIIER 2. NAME OF OPERATOR SIIIIMIT IN 'i'1{11'1 ,. fF (Olhet in.qruction,,; on reverse side) SINGLE ZONE [] MULTIPLE ZONE Amoco Production Coma~ 3. ADDRESS OF OPERATOR P. O. Box 779, Anchorag~ Alaska 99510 4. LOCATION OF WELL Atsufface 771" FNL, 713' FEL, Section 12, T10N, R12W, Center of Leg 4, Slot 8, Granite Point Platform Anna At proposed prod. zone (~OO o~f__C_-p _zone at 89_00' TVD) 900' ~St, 'z~O.O FEL, Sec. 1, T10N, R12W, S.M. 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN.OR POST OFFICE' " 7-1/2 miles southwest of Tyonek, Alaska 14. BOND INFORMATION: blanket Surety and/or No. 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST 2880' from west PROPERTY OR LEASE LINE. FT. ' (Also to nearest drig. unit. it'a,~y) line' of ADL 18742 ]8. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING,COMPLF'.TED, 1300' NW OR APPLIED FOR, FT. from GP 18742 Well No. 4 21. ELEVATIONS (Show whether DF, RT, CR, etc.) t l6. No. OF ACRES IN LEASE 5060 ~ PROI~SED'DE~H 9800'. APl No. 50-133-20297 $. 6. LEASI:. DFSIGNATION AND SI:RIAL NO. ADL-18742 7. IF INDIAN, ALLO'I'rEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Granite Point Sc'ate 18742 9. WELL NO. 26 ,10. FIELD AND POOL. OR WILDCAT Granite Point !1. SEC., T., R.. M., (BOTTOM l lOLE OBJECTIVE) Sec.' 1_______, T10N, R12W, S.M. 12. Amount $100,000 17. NO.ACRI:~S ASSIGNED TO TI'lIS WEL. L 8O 20. ROTAR'Y OR CABLE TOOLS rotary 22. APPROX. I)ATF' WORK WILL START 10-10-76. 105' RDB - MSL PROPOSEI) CASING AND CEMENTING PROGRA~'--~ ' 26" | ~0-;;-'~ ]94¢-~"7-, - ' ~~ · ' __ , .... ozz J. zu3 sx, previousl set 7-9- 17-1 2" 13-3 8" 54.'5# 2 (7-9-67) : , assuming ~]~ ppg mud]~ Operator proposes to directionally drilI welI from existing. 13-3/8" casing in Leg 4, Slot 8, Granite Point' Platform Anna. There are no 'affected operators. All zones through the C-8 sand member of the Middle Kenai "C" Unit will be evaluated and the well will be selec- tively completed as a producing oi'l well. Subject well will.be spudded on or about .October 10, 1976. A plat and a sketch of BOP s~a..c:~ ;a.r~:ange- .;...: ;.; ......... meat are .attached. i, !.i: [i:':~ {!:] !'.'"~ !:. "" ~ '" }, ,, , ~ ,: ,, [ ~ ~.~, i .! IN ABOVE SPACE DESCRIBE PROPOSFA) PROGRAM: if propo~l is to deepe~i give d;,fa on present productive zone pad proposed new productive zone. If propo~d is to drill or deepen dffection;flly, give pertinent data on subsurface locations and m¢.'tsured and trt, e vertical depths. Give blowout preventer program. SmSm)-~~~' ~C:*~J ' OATE~tember 29~ 1976 ~TLE'~rea Superintendent (This space for Stale. office pse) ISAMPLES AND CORE CI'HI~ REQ.UIRED ~ YES j~ NO , DIRECTIONAL SURVEY REQUIRED . · ~VES [] No MUD LOG [] YES CONi)ITIONS OF AI'I'ROVAI.,, IF ANY: [] NO OTltER REQUIREMENTS: A.P.I. NUMERICAL CODE 50-]33-2o297 PERMITNO.: 76-77 APPROVAL DATE October 13, 1976 APPOVE'DBY-- "/~~~'~f"- ~ . " TITLE Chairman DATE' October 13: 1976_' '~' ~' *See Instruction On Reverse Side . .(/~,~:o) · Amoco Pr<~duction Comp, r,L~ · · · ' o ENGINEERING CHART ~, APPN · · I Ii .~, ; ,3? . . ELL 2L,, Lo¢R'r'~o,l,".i II .SEc- T'ION I ...~ ~ c r,j/c~/'V. I~, ,I I I I I I I I O~-O01B STATE of ALASKA DEPARTMENT OF NATURAL RESOURCES Division of Oil and Gas Conservation TO.- I-- WELL FILE Hoyle H. Hamilton FROM: Director DATE : January 7, 1976 SUBJECT: Amoco Well No. 26 Granite Point Field Bill Halverson, Amoco, called January 6, 1977 to report they have drilled a 6" hole from base of 7" liner at 10,336~to 10,860'. Tested top 200' of this interval and recovered only 10 bbls. of mud. Cut core in bottom and recovered mostly shale at dips between 80-85°. Logged and found only one small tight sand in entire interval. No pay indicated. I gave him verbal approval to set a bridge plug in bottom of 7" liner and proceed with the remainder of their program which calls for completing in C-3 through C-7 sands at selected interval, s. , . R~',,TS CHECK LIST FOR NEW WELL PE ''~ Company Yes . Ho Remarks · . _ Is the pe.rmit fee attached ..................... Lease & Wel Is we!l to be loca~a in a defined pool · · Is a ,-~nist=red survey plat attached Is well located D,'oDer distance from propeF.5 line , i j, . Is well located pro2er distance from other wells . . Is sufficient undedicated acreage available in this ~ool . . !s ;.:ell to be de,.,iated .... Is o?erator the only a=~ ,Tected party . . . Can permit be approved before ten-day wait . . .Does operator have a bond in force . Is a conservation order needed ........... Is administrative approval needed . Is conductor string provided .................. . Is enoueh cement used to circul'ate on conductor and surface Will cement'tie in surface and intermediate or prod.uction strings ,. Will cement cover all known productive horizons . . .. ..... '. Will surface casing p. rotect fresh water zones' . ...... Will all casino mive adequate safety in collapse, tension & burst ~ Does BOPE have sufficient pressure ratinfi· · m.c~. ~./?...,. .id~tional Requirements' ., ,. · : 2. DprO,.'a 1 RecommenceJ' Geolomv Enoineerin~.' TR,~; HWK ~:/'~/"" 0 ?',G . HHH JAL '- '""'" ECS ,7"'~'""JCM ~ ~ ised 1/15/75