Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout176-077 f STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well:
Alter casing: Repair well: Plugging: Time extension: Stimulate:
Change approved program: Pull tubing: Variance: X Perforate: Other:
2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB)
UNION OIL COMPANY OF CALIFORNIA (UNOCAL) Development: 105' KB MSL feet
"3. Address Exploratory: 7. Unit or Property name
Stratigraphic: Granite Point 18742
P.O. BOX196247 ANCHORAG)E, AK,,,. 995,,1.9 Service: X
4. Location of well at surface .../~//' J 8. Well number
771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM 26 /
At top of productive interval 9. Permit numberN.
/
595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M. 76-0077-0
At effective depth 10,310' 10. APl number
963' FSL, 2898' FEL, Sec. 1, T10N, R12W, S.M. 50- 733-20297-00
At total depth 11. Field/Pool
1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M. Middle Kenai "C" Sands
12. Present well condition summary
Total depth: measured 10860' feet" '
true vertical 10377' feet ''/ Plugs(measured)
Effective depth: measured 10310' feet Junk (measured)
true vertical 9831' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural 622' 20" 1285 sx 622' 622'
Conductor 2022' 13-3/8" 1600 sx 2022' 1990'
Surface 8004' 9-5/8" 700 sx 8004' 7600'
Intermediate
Production
Liner 2608' 7" 500 sx 10336' 9857'
Perforation depth: measured See Attachment
true vertical See Attachment
Tubing (size, grade, and measured depth) Short 3-1/2", N-80 @ 7632'
Long 3-1/2" N-80 @ 7761' 2" HS-80 Coiled Tubing @ 7541'
Packers and SSSV (type and measured depth) Baker "FA-I" PKR @ 7541'
13. Attachements Description summary of proposal: Detailed operations program: BOP sketch:
Temperature Survey, Step Rate Test, Wellbore Schematic, and Perforation Detail Sheet.
14. Estimated date for commencing operation 15. Status of well classification as:
N/A
16. If proposal well verbally approved: Oil: Gas: Suspended:
Name of approver Date approved Service: X
'17. I hereby certify that th,.gJem~oing is true and correct to the best of my knowledge.
Jeffery J. Dd~n / .// if~ ."~
Signed: ~~/"/' \,/¢ ~ Title: Waterflood Technician Date: 8/22/2002
// Y ./ FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness IA,.p,.proval No.
Plug integrity BOP Test Location clearance ('~ ~i""'~ ~'"" ,~i ...... ?" ~,i
'~ ~ ~- Mechanical Int-~gr~ Test ~ ---~--~sequent form required 10- e"C~'-~rN,,~-,.c,~ ~~~'
...::..i,,,it,2', .~:....~.. ~. ......
,,
..... Approved by order of the Commissioner Commissioner Date
Form 10-403 Rev 06/15/88
BFL
ORIGINAL
APR 1 003
!
SUBMIT IN TRIPLICATE
NOTE TO FILE
Granite Point Anna 26-42
PTD 176-077 302-271
Unocal has submitted a temperature survey to demonstrate mechanical integrity for this
injection well. Anna 26 is one of several production wells without packers that were
approved for conversion to injection service in early 2000. This note evaluates Unocal's
submitted information and recommends acceptance of it.
In late 2000, Unocal proposed to convert several production wells to injection service.
This request for GP Anna Platform was similar to the request of MGS Baker platform a
year earlier. What is notable on these conversions is that none of the wells was
completed with a packer. All the wells had been equipped with dual tubing strings and
were hydraulically pumped. A procedure was developed that involved reviewing the well
history and determining that the casing had been tested, evaluating the cement bond
logs and running sequential temperature surveys to demonstrate that the injection water
was being confined to the intended intervals. In addition, Unocal placed the wells on the
monthly monitoring list and has been providing daily rates and pressures in digital form.
I made an assessment of the well's construction in early October 2000 and acceptable
mechanical integrity was determined. Although approval was given to convert the well in
late 2000, water was not injected until May 2002. 2 temperature plots are presented on
the graph. The baseline survey was obtained in 11/25/01. After 90 days injection, a
follow up survey was obtained 7/31/02 and shows the expected cool down due to
injecting relatively cold filtered inlet water, especially in the perforated intervals. The well
has performed satisfactorily since conversion. Since placing the well in service, Unocal
has been providing the necessary monitoring information. Examination of the
information indicates that the tubing and casing pressures have been tracking as
expected with the pressures responding to rate changes. No high rate change is evident
which would indicate a leak developing. The most recent information indicates that the
well has been shut in since mid January.
Area Injection Order 6 allows injection into the Northern Portion of Granite Point Field,
developed by the Anna and Bruce Platforms. The BHL of well An-26 is located in the
covered area. The portion of aquifers beneath Cook Inlet described by a 1/4 mile area
beyond and lying directly below the Middle Ground Shoal Field are exempted for Class II
injection activities by 40 CFR 147.102(b)(2)(i) and 20 AAC 25.440(c). Granting Unocal's
request will not endanger any fresh water.
I recommend acceptance of the submitted temperature information. A follow up survey
should be required in 2 years and the monthly pressure and rate information should
continue to be submitted.
Tom Maunder, PE
Sr. Petroleum Engineer
April 11, 2003
M:\UIC File Reviews\030411-GP 26-42.doc
--
Summary by Month: Individual Well Injection / Disposal
Well Name:
Field/Pool:
2002
GRANITE PT ST 18742 26
GRANITE PT, MIDDLE KENAI
APl:
50-733-20297-00-00
Sales Cd: 30
Jan Feb Mar Apr May
Permit to Drill: 1760770 Operator: UNION OIL CO OF CALIFORNIA
Acct Grp: 2 Final Status: 1-OIL Current Status: 1WINJ
Jun Jul Aug Sep Oct Nov Dec
Meth
Days
Wtr
Gas
2002
2003
Totals:
Water 71,483
Gas
wtr tnj
3O
8,795
0
0
Jan Feb Mar Apr May
Wp I~ Wp Inj W~ I~ Wp I~ Wp IN Wp IN
30 31 29 19 31 30
5,651 10,166 5 8,831 13,383 11,343
0 0 0 0 0 0
Cum Wtr 71,483 Cum Gas 0
W~ IN
31
13,309
0
Jun Jul Aug Sep Oct Nov Dec
Meth Wtr Inj Shut-In
Days 13 0
Wtr 9,359 0
Gas 0 0
2003 Totals:
Water 9,359
Gas
Cum Wtr 80,842 Cum Gas 0
Friday, April 11,2003 Page 1
Anna 26
3000
2500
2000
1500
IOO0
5OO
0
JAN. 1.2003 7:31AM
NO. 073
P.5/8
.
e
17fç;-D7í
Month
Dee
API No Platform Dahl created
&0733202970D ANNA PLATFORM 1/1/2003
Date Hrw On VolumelnJlcted TØG Press 9.625 CSG Press 13.375 CSDpress Comments
12/1/20112 24 1495 2067 2067 241
1212/2002 24 1504 2100 2100 241
12/3/2002 24 1506 2119 2100 239
1214./2002 24 1509 21:ro 2130 241
12/512002 24 1511 2148 2148 242
12/6/2002 24 1511 3375 3375 223
12n12002 24 1512 2169 2169 238
12/8/2002 24 1510 2177 2250 233
121912002 24 1511 2181 2181 2ag
12/10/2002 24 1510 2188 2188 238
12/11/2002 24 1507 2191 2191 236
12/1212002 24 1507 2194 2194 233
12/13/2002 24 1503 2200 2200 233
12/14/2002 24, 1496 2133 2250 231
12115/2002 24- 660 1064- 10B4 203
12/1612002 24 54,4 1772 1772 231
12/1712002 2<4, 1244 1656 1608 222
12/1 812002 20 993 1864 1864 230
12/1 9/2002 24- 1643 2320 2250 233
, 2120/2002 24 174ð 2372 2350 230
12/2112002 24 1737 2394 2394 230
'2/2212002 24 1732 2413 2400 228
12/2312002 24 1733 2425 2400 228
12124/2002 24 1732 2438 2425 310
1212512002 24 1730 2445 2445 223
12/2612002 24 1726 2455 2450 222
12/2712002 24 1724 3342 2450 222
1212812002 24 1722 2463 2450 225
12/29/2002 24 1718 2467 2450 225
12/3012002 24 1718 2475 2475 225
12/3112002 24 1318 2313' 2313 222
...:~~.~....,....
(-,""'!,\r:J¡¡".¡,cr·
."t-.i"\lp T. r., ¡c:,¡, .
C l"" ()f\ n~
" ~) LUUJ
SEP. 1.2002 6:43AM
NO.431
P.4/9
-
e
Iltp-071
Year
2002
API No Plalfonn
5.07332E+11 ANNA ÞLATFO
Date Created
911/02
Volume TBG 9.625 CSG
Date Hra On lniectéd Press Press 13.375 Ceo Press Comments
8/1/2002 24 0 0 0 275
8/212002 24 0 0 0 280
81312002 24 0 0 0 280
8/4/2002 24 0 0 0 280
8/5/2002 24 5 0 0 285
BI6/2002 24 0 0 0 285
817/2002 24 0 0 0 283
61812002 24 0 0 0 291
8/9/2002 24 0 0 0 281
8/1012002 24 0 0 0 ~94
8/11/2002 24 0 0 0 294
8/1212002 24 0 0 0 281
8/13/2002 24 0 0 0 295
8/14/2002 24 0 0 0 302
6/15/2002 24 0 0 0 300
8/1612002 24 0 Q 0 295
8/1712002 24 0 0 0 295
8/1612002 24 0 0 0 294
B/1912002 24 0 0 0 295
8120/2002 24 0 0 0 302
8/21/2002 0 0 0 0 297
6/22/2002 18 0 0 0 300
B/2:3/2002 6 0 0 0 300
8/2412Q02 24 0 0 0 303
8/2512002 0 0 0 0 303
8/26/2002 24 0 0 0 300
8/2712002 24 0 0 0 305
8/2812002 24 0 0 0 0
8/2912002 24 0 0 0 300
6/30/2002 24 0 0 0 305
6/31/2002 24 5 0 0 295
lõntl Of bport
.... -,~.,.,..,-._~.
-........-~~_.
p
t~
d
\'
\'
() Report Name
\ IMontldv Infector Varianc
~I
(\
IS)
IS)
(\
M
t!)
:::J
a:
E
a:
U)
(Y)
U)
aJ
""
(\
o
z:
-
e
Volume TBG 9.625 CSG
Date HIS On Iniected Press Press 13.376 Csg Press Comments
7/1/2002 24 314 275 375 285
71212002 24 422 500 600 275
71312002 24 480 530 650 275
71412002 24 477 540 650 280
71512002 24 1250 2575 2300 340
71612002 24 2329 2600 2500 320
71712002 24 179'1 2555 2500 325
7J8I2002 24 2117 2606 2606 319
7/912Q02 24 2092 2623 2623 317
7/1012002 24 1291 1570 1570 289
7I1112Q02 2.4- 1305 1830 1830 302
7/1212002 24 1480 1863 1863 308
7/13/2002 24 1472 1877 1877 305
7/14/2002 24 146B 1889 1889 311
7£15/2002 24 1170 1420 1600 285
7/16/2002 24 1058 1365 1500 295
7/17/2002 24 108a 1350 1500 290
7/1812002 24 1053 1335 1500 280
7/19/2002 24 1048 1325 1500 285
7/2012002 24 1040 1315 1500 285
7/2112002 24 1037 1310 1500 285
7/22J2002 2.4 1026 1306 1450 283
7/2312002 24 1021 1309 1450 283
7/2412002 23.6 997 1281 1450 277
7/2512002 2.4 1011 1294 1450 281
712812002 24 1005 1294 1450 280
7127/2002 24 1003 1295 1450 280
712812002 24 1002 1292 1450 281
7/29/2002 24 361 1290 1450 280
7/3012002 24 0 16 0 264
7/31/2002 24 0 0 0 270
t
¡,
t:
1,
f
I
'\~'t!raø~'
(J)
"-
If)
!L
Tbg
Strio
AN26~2
Month
Ju]
Year
2002
APi No
5.07332E+11
Platfonn
ANNA PLATFO
Date Created
8/1/02
[Fwd: Anna 26 (176-077) MIT failure]
Subject: [Fwd: Anna 26 (176-077) MIT failure]
Date: Tue, 14 Jan 2003 07:26:08 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: Bob Fleckenstein <bob_fleckenstein@admin.state.ak.us>, Jim Regg <jim_regg@admin.state.ak.us>
Bob,
Would you please make an entry in the database regarding this MIT
failure. I think you can put the information in the comment column.
Jim,
This well is an injector without a packer, I have enclosed the document
I prepared in October 2000.
Thanks,
Tom
Subject: Re: Anna 26 (176-077) MIT failure
Date: Tue, 14 Jan 2003 07:22:29 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Dolan, Jeff J" <dolanjj@unocal.com>
Jeff,
Thanks for the notice. As you and the platform sort things out, keep us informed regarding the determination.
Tom Maunder, PE
AOGCC
"Dolan, Jeff J" wrote:
Tom,
At 15:53 today the tubing, 9 5/8" and 13 3/8" casing equalized pressure on Anna 26 water injector. The platform crevimmediately shut in
the well and began bleeding down the casings.
Regards;
Jeff Dolan
Water Flood Technician
Oil Asset Group
Alaska Business Unit
Unocal 76
Voice 907.263.7807
Fax 907.263.7884
Email dolanjj@unocal.com
1 of 2 1/18/2003 4:14 PM
Unocal 1 Anna 26-42 temperature and step rate data sets.
•
Maunder, Thomas E (DOA)
From: Dolan, Jeff J [dolanjj@unocal.com]
Sent: Monday, September 09, 2002 2:09 PM
To: tom_maunder@admin.state.ak.us
Cc: Martin, J. Hal
Subject: Unocal /Anna 26-42 temperature and step rate data sets.
Attachments: Anna 26 20020821.zip
Tom,
- ~~~
Here are the temperature survey data and step rate data for Anna 26-42 (Permit # 1760770 API# 50-733-
20297-00). I mailed the request for variance letter and 10-403 before going on vacation (August 22) but
I don't believe I got the data emailed to you.
«Anna 26 20020$21.zip»
Regards;
Jeff Dolan
Water Flood Technician
Oil Asset Group
Alaska Business Unit
Unocal 76
Voice 907.263.7807
Fax 907.263.7884
Email dolanjj@unocal.com
~~~ APR ~ ~ 2005
• Page 1 of 1
4/8/2008
ANNA-26 Step Rate Test July 2, 2002
Frac Pressure and Infectivity Analysis
4000
3500
3000
2500
rn
h
a
m
2000
L
a
rn
c
H
1500
1000
500
0
• ~
•
• N
•
• Historical Data
® SRT
Linear (SRT)
0 500 1000 1500 2900
Rate bwipd)
•
•
2500 3000 3500 4000
4/8/2008 8:49 AM Jeff Dolan AN 26 Step Rate Test.xls SRT Press vs Rate
Step rate data recording sheet
Well : An-26 Date /Time Rate BPD Tubin pressure casin pressure Choke Comments
Start of Test Manifold pressure
7/2/02 14:00 492 470 277 8/64tn 3500 psi
Reduce to 500 bwpd
Wait 72 hours
Step 1 1000 BWPD
7/5/02 15:00
1030
981
2g5 m
12/64 Manifold pressure
3490 psi
Step 2 1500 BWPD
7/6/02 16:00
1490
1413
314 m
13/64 Manifold pressure
3580 psi
Step 3 2000 BWPD m Manifold pressure
7/7/02 17:00 2006 1972 334 14/64 3502 psi
Step 4 2500 BWPD :n Manifold pressure
7/8/02 18:00 2550 2541 350 20/64 3544 psi
Step 5 3000 BWPD Manifold pressure
7/9/02 19:00 2835 2830 353 Full 3437 psi
Step 6 3500 BWPD
End of test
Step 7 4000 BWPD
Step 8 5000 BWPD
Step 9 5500 BWPD
Step 10 6000 BWPD
•
Note :record data at end of each period just before increasing rate to allow 1 hour for pressures to stabilize
• •
AN-26 Temperature Surveys
0 .
500
i
1000
1500
i
2000
2500
3000
i
3500
I
m
Y
t 4000
..
a
i
4500 j
i
i
I
5000
5500
6000
6500 i
i
7000
i
7500
i
8000 ~-
0
20" Csq (® 622' MD
POOH 11 25 2001 Baseline
RIH 07 31 2002
POOH 07 31 2002
POOH 07 31 2002 corrected
73-3/8" Csg ~ 2022' MD ~
- --- - -
Applied constants to depth
and temperature to remove
_- - -- - -
recording di erences
_ ~ ~
- - - ~
-- -
i
_ -Coil Tbg Cavity ~ 7541' MD
I ~ i i i
20 40 60 80 100 120 140 160 180
Tem p
Unocal Corporation
P.O. Box 196247
Anchorage, AK 99501
Telephone (907) 263-7805
UNOCAL )
August 22, 2002
State of Alaska
Alaska Oil and Gas Conservation Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Attn: Tom Maunder
Re: Anna 26-42 injection variance
Dear Mr. Maunder:
The follow-up temperature survey for Anna 26-42 (Permit # 1760770 API# 50-733-20297-00)
water injector was completed July 31, 2002. The well was on injection at low rates for 90 days
during which time approximately 68,000 bah'els of cool filtered seawater was injected. We feel
this is sufficient volume to reveal any temperature anomalies resulting from flow into undesired
intervals. None are observed on the attached temperature survey plot.
The step rate test (SRT), conducted on July 2, 2002, was performed up to the maximum available
pump pressure of 2,830 psi and as expected, showed no indication of exceeding the formation
fracture pressure. Ongoing facilities maintenance issues on the Anna delayed the completion of
this project.
I have transmitted the basic data files for the SRT and Temperature surveys to you by email.
I am requesting your approval for a variance to continue injection into Anna 26-42 under the
procedures set forth in the document "Procedures to Obtain Variances on Packerless Wells
(version 4) February 9, 2000". I have enclosed a 10-403 for your signature along with plots of
the temperature survey and step rate test. If you have any questions regarding this, please contact
myself at 263-7807 or Hal Martin at 263-7675.
Enclosures
Sincerely,
jeff~~~l~
Water flood Technician
Cook Inlet Water flood Management
Aogcc An 26 Application tbr variance.doc
Comparison after 90 days injection
POOH 11 25 2001 Baseline
RIH 07 31 2002 Follow up
ICoil Tbg Cavity @ 7541' MD
0 2O
8/22/2002 7:32 AM
40 60
80 100 120 140 160 180
Temp
Anna 26 Temp Survey composite 20020821.xls Chart
4000
ANNA-26 Step Rate Test
Frac Pressure and Injectivity Analysis
July 2, 2002
35OO
3OOO
25OO
2000
1500
IOO0
5OO
0
8121102 4:57 PM
500 1000 1500 2000 2500 3000 3500 4000
Rate(bwipd)
Jeff Dolan AN 26 Step Rate Test. xls SRT Press vs Rate
Plot Rate vs Time - We~l AN 26-42
Data Interval
Rate vs Time
Tbg P vs Time
Csg P vs Time
Time
%~*J'~* Well No. 26
Actual ,/et Pump Comptedon as of 1/23/99
RKB to TBG Head = 33'
, E
Tubing
7561'-7566'
7,25,'98
Anna 26 1-23-99 final dwg.doc
CASING .AND TUBING DETAIL
20" 74 J-55 SurDce 622'
1%3/8" 545 J-55 12615 SurPace 2,022'
%5/8" 40 & 435 N-g0 & S-95 BT£ 8755 Surfi~ce 8,004'
7" 26 N-80 BTC 6276 7728' 10,336'
Tiibing:
LS 3-b2" 92 1-80 BTC SC' 2992 34' 7,761'
SS 3-1/2"92 [.-80 B'I( SC 2992 34' 7.632'
2" 156" ~allHS-80 Coll Ib~ 1688 32' 754 !'
JEWELRY DETAIL
NO~ De~ ID OD lten~
50 3'
2 7,642' 300 3865
3 7.64¥ 2~697 650
4 7,665' 300 4.50
5 7,666' 2992 35
6 7,761' 300 425
Cameron, DCB, Fubing tlangeh 3-1/2' x i I", 5M. 3-1/2"
EUE Lif~ l'lnead × Butt Suspension [bread,
BPVP
Crossover, 3-l/2" Buttless Box x 3-1/2" iii 8rd Pin
Kobe Cavity, 3", Fype :B', ParalId Db} SN: 231-1-I0-97
Crossover, 3-I/2" [[ I' 8rd Box x 3-I/2" Buttress pm
3 i~s, 3 [/2". 92~, L-gO. Buttress Tubing
Wireline Entry Guide, 3- I/2" Buttress Box
D 7526' 1.625" 2.270" Trico jet pump cavity
7540' 1.300" 2.750" Baker Seal Assy and seal bore extension
754U 1.440" 2.200" Baker K-22 Anchor Seal Assy
E 7541' 1.375" 2.765" Baker "FA-I" packer
ELM
Short Strin&[
A 7,632' 200 3865 Crossover, 3-1/2" Bum'ess Box x 2-3/8" EUE 8rd }>in
B 7,633' 200 2375 Pup Joint, 2-3/8" IrE 8rd
C 7595' 1.688 6' Tbg perf gun stuck in short string. 21.5' hmg total
WLM fish
PERFORATION HISTORY
-- ln!~rval , Accum. ,
Date Zone Top Btm Amt _spf Comments
1/9/77_ C-3 8,2~' . 8,266'. 50' . 4 S~ueezed 7-3%86
1/9/77, C-3. 8 270'. 8~296'· 26' , 4 Squeezed 7~3%86
1/9/77, C~4, 8 307'. 8 340'. 33' , 4 Squeezed 7-31-86
11/22/98 C-5 8 467'. 8 589'. 122' 8 ~Reperf. 2-1/8" E J, 0 deg.
11/22/98 _ C-5. 8,635'~ 8,660' 25' . 8 LReperf. 2-1/8" E J, 0deg.
11/22/98 C-5 8,678'. 8 744', 66' , 8 ;Reperf 2~1/8" E J, 0 de~.
17~2/97 . C-6· 8,973'. 9,000' 27' , 8 Reperf, 2-1/8" E J,0 deo
11/22/97 . C-7. 9 485', 9 530'. 45' 8 Reperf. 2-1/8" E J,
11/22/97 . C-7 9,540'. 9,795' 255'. 8 Rep~d~ 2~1/8" E J, 0 de~
11/22/98 ~ C-7_ 9 880'~ 9 955', 75' , 4/8/12Reperf, 2-1/8" E J, 0 de9.
C-7. 9 956', ~10 045' . 89' . 4/8 Reperf 3/3!/85.
PBTD = 10,310' TD = 10,860'
MAX HOLE ANGLE = 25° @ 6,200'
DRAWN BY: TAB 08/22:02
Zone
C-3
C-3
Anna 26 Perforations
MD TVD Subsea
Top Btm Top Btm Top Btm
8,216' 8,266' 7,793' 7,839' -7,688' -7,734'
8,270' 8,296' 7,849' 7,867' -7,744' -7,762'
C-4 8,307' 8,340' 7,877' 7,914' -7,772' -7,809'
C-5 8,467' 8,589' 8,027' 8,139' -7,922' -8,034'
C-5 8,635' 8,660' 8,187' 8,215' -8,082' -8,110'
C-5 8,678' 8,744' 8,224' 8,291' -8,119' -8,186'
C-6 8,973' 9,000' 8,513' 8,542' -8,408' -8,437'
C-7 9,485' 9,530' 9,011' 9,060' -8,906' -8,955'
C-7 9,540' 9,795' 9,070' 9,317' -8,965' -9,212'
C-7 9,880' 9,955' 9,405' 9,475' -9,300' -9,370'
C-7 9,956' 10,045' 9,475' 9,564' -9,370' -9,459'
Amt
Comments
50' Cmt Sqz'd 7/31/86
26' Cmt Sqz'd 7/31/86
33' Cmt Sqz'd 7/31/86
122'
25'
66'
27'
45'
255'
75'
89'
8/22/2002 8:45 AM An-26 403 request for variance 20020822.xls Attachment
JUM. ~.~00~ 6:19AM
>Historical Data >Wefts )Stattls (da~ly info) >WMerffood Iit]ectors
Select Tbg lAN26~:2 --:T.~) Select Time ILast M~nth'
String: ."~J Period:
Report Name Tbg String Time Period
Waterflood Injector Well Status AN 26.42 Last Month
Length Volume l'bg Press Csg Press
Date (hours) (blxl) (psi) (psi)
6/:I./DZ 2,~ ~6 390
5131/02 2~ ~72 45S
5130102 24 473 4~S
~/29/02 24 4?2 ~ ~6
5/28/02 24 ~72 428 428
5/27102 2~ 283 375
5126/02 2'~ ~ 456 $$0
5/25/02 24 24~ 223 650
512%/02 24 524 562 650
5/23/02 24 503 520 650
5122/02 24 505 523
;/21/02 24 495 s.~G
5120/02 24 ,H7 $].7 50O
5/18102 2[ 736 768 9;0
St[7102 22 10].8 ].35! 1500
5115102 24 1095 1472 1650
5114102 2'~ 1092 1477 1650
5/I3/02 24 lOl~ 3.470 t650
SI~210Z 24 110t 1700 ~6SO
5111/02 24 1141 1700 1600
$/10/02 2~ [136 17~0 3.650
5f8/02 Z4 109], 1700
517/02 24 1098 2000
5f6/02 24 2ms 1B50
5/5102 21. 976 1BOO 1800
514/02 2~ 972 1950 1950
S15/0~. 18 602 1~50 1450
Date Created
6/2/02
Outer Csg Press
(psi)
25O
245
245
250
252
2~
247
24.7
233
264
266
267
288
2O
2~
2~
25
222
225
HO. 935 F'p. 3/801'
Comments
RECEIVED
JUN 0,3 00/_
I~nd of Report
http ://]codi ak. each ortown, unocal, com,/da/ts, topi ares/tabu! ar, asp 6/2/2 00:2
Unocal Corporation
Alaska Business Unit
909 West 9th Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 263-7807
UNOCALe
May 8, 2002
Tom Maunder
State of Alaska
Alaska Oil and Gas Conservation
Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Re: Completion of Conversion for An-26
Dear Mr. Maunder:
The conversion of An-26 to water injection was completed and injection started on May
2, 2002. We plan to conduct a Step Rate Test on or about May 16th and a Temperature
Survey on or about June 2nd in accordance with the plan "Procedures to Obtain
Variances on Packerless Wells (version 4) February 9, 2000".
The well had a baseline temperature survey run on 11/25/98. The new survey data will
be compared with that to provide verification of casing integrity.
Enclosed is the 10-404 form documenting the conversion. I have attached a well bore
schematic, a perforation data sheet and data sheet with the first six days rate and pressure
data. Another 10-403 will be submitted with the results of the Step Rate Test and follow-
up Temperature Survey to obtain a Variance to inject into this well.
Water flood technician
Cook Inlet Waterflood Management
O:\AOGCC\Correspondences\An-26 10-404 cover letter.doc
STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown: Stimulate: Plugging: Perforate:
Pull tubing: Alter casing: Repair well: Other: X convert to injection
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
Unocal Development: X KB 105' above MSL feet
3. Address Exploratory: 7. Unit or Property name
P. O. Box 196247 Stratigraphic:
Anchorage, AK 99519-6247 Service: Granite Point 18742
4. Location of well at surface 8. Well number
771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM Anna-26
At top of productive interval 9. Permit number/approval number
595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M. 76-0077-0
At effective depth 10310' 10. APl number
963" FSL, 2898' FEL, Sec. 1, T10NR12W, SM 50-733-20297-00
At total depth 11. Field/Pool
1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, SM Middle Kenai "C" Sands
12. Present well condition summary
Total depth: measured 10860 feet Plugs (measured)
true vertical 10377 feet
Effective depth: measured 10310 feet Junk (measured)
true vertical 9831 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 622' 20" 1285 sx 622' 622'
Surface 2022' 13-3/8" 1600 sx 2022' 1990'
Intermediate 8004' 9-5/8" 700 sx 8004' 7600'
Production
Liner 2608' 7" 500 sx 7728'-10336' 7343'-9857'
Perforation depth: measured see attachment
true vertical see attachment
Tubing (size, grade, and measured depth) Short 3-1/2", N-80 @ 7638 1.75" 1.91# QT-700 Coiled Tubing @ 7518'
~"'" '~'~ ~"" ~"~" .... '" '?'
Long 3-1/2" N-80 @ 10060"
Packers and SSSV (type and measured depth) Halliburton TBG PKR @ 7548' .'.~
....... ~ .... ~ ,~ ~ ~. i "';~
13. Stimulation or cement squeeze summary ~, ..,"'
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Averaqe Production or Injection Data
OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 20 150 120 100
Subsequent to operation 0 1014 25 1866
15. Attachments: 16. Status of well classification as:
Copies of Logs and Surveys run:
Daily Report of Well Operations: Oil: Gas: Suspended: Service: X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge:
Signed: ~ ~~.~L~,~ Title: Water flood Technician,., Date:5/8/2002
Form 10-~/04 Rev 05/1,5/88
SUBMIT IN DUPLICATE
Page 1 of I
>Historical Data >Wells >Status (daily info) >Waterflood Injectors
Select Tbg String: iA.N 26T42 .. '-_J Select Time Period: IAII Data.
Report Name Tbg String Time Period Date Created
Waterflood Injector Well Status AN 26-42 All Data 518/02
Date Length Volume Tbg Press Csg Press Outer Csg Press
(hours) (bpd) (psi) (psi) (psi)
5/7/02 24 1098 2000 1900 25
5/6/02 24 1095 1850 1850 25
5/5/02 21 976 1800 1800 222
5/4/02 24 972 1950 1950 225
5/3/02 18 602 1450 1450 228
5/2/02 14 574 1700 1700 233
Comments
End of Report
http ://kodiak. anchortown.unocal.com/da/templ ates/tabul ar. asp ?report_id=229 5/8/2002
Anna 26 Perforations
MD TVD Subsea
Zone Top Btm Top Btm Top Btm Amt
Comments
C-3 8,216' 8,266' 7,793' 7,839' -7,688' -7,734'
C-3 8,270' 8,296' 7,849' 7,867' -7,744' -7,762'
C-4 8,307' 8,340' 7,877' 7,914' -7,772' -7,809'
C-5 8,467' 8,589' 8,027' 8,139' -7,922' -8,034'
C-5 8,635' 8,660' 8,187' 8,215' -8,082' -8,110'
C-5 8,678' 8,744' 8,224' 8,291' -8,119' -8,186'
C-6 8,973' 9,000' 8,513' 8,542' -8,408' -8,437'
C-7 9,485' 9,530' 9,011' 9,060' -8,906' -8,955'
C-7 9,540' 9,795' 9,070' 9,317' -8,965' -9,212'
C-7 9,880' 9,955' 9,405' 9,475' -9,300' -9,370'
C-7 9,956' 10,045' 9,475' 9,564' -9,370' -9,459'
50' Cmt Sqz'd 7/31/86
26' Cmt Sqz'd 7/31/86
33' Cmt Sqz'd 7/31/86
122'
25'
66'
27'
45'
255'
75'
89'
5/8/2002 10:32 AM An-26 403 conversion 1-5-00.xls Attachment
UNOCAL
Anna
Well No. 26
Actual Jet Pump Completion as of 1/23/99
RKB to TBG Head = 33'
SIZE
20"
13-3/8"
9-5/8"
7"
CASING AND TUBING DETAIL
WT GRADE CONN ID
TOP
74 J-55
54.5 J-55 12.615
40 & 43.5 N-80 & S-95 BTC 8.755
26 N-80 BTC 6.276
Surface
Surface
Surface
7728'
BTM.
622'
2,022'
8,004'
10,336'
Tubing:
LS 3-1/2"
SS 3-1/2"
9.2 L-80 BTC SC 2.992
9.2 L-80 BTC SC 2.992
34' 7,761'
34' 7,632'
.156" wall HS-80 Coil Tb~
1.688 32' 7541'
Tubing
7561 '-7566'
Cavity
leak
identified
7/25/98
Fill
tagged @
9,962'
7/23/98
2.25 GR
.C = Fish
Tubing
Holes
7585'-759'
NO. Depth
JEWELRY DETAIL
ID OD Item
I 50.3'
2 7,642' 3.00 3.865
3 7,643' 2.687 6.50
4 7,665' 3.00 4.50
5 7,666' 2.992 3.5
6 7,761' 3.00 4.25
Low, Strino
Cameron, DCB, Tubing Hanger, 3-1/2" x 11", 5M, 3-1/2"
EUE Lift Thread x Butt. Suspension Thread, Type "H"
BPVP
Crossover, 3-1/2" Buttress Box x 3-1/2" EUE 8rd Pin
Kobe Cavity, 3", Type 'B', Parallel Dbl. SN: 231-1-10-97
Crossover, 3-1/2" EUE 8rd Box x 3-1/2" Buttress Pin
3 jts, 3-1/2", 9.2#, L-80, Buttress Tubing
Wireline Entry Guide, 3-1/2" Buttress Box
D 7526' 1.625" 2.270"
7540' 1.300" 2.750"
7541' 1.440" 2.200"
E 7541' 1.375" 2.765"
ELM
A 7,632' 2.00 3.865
B 7,633' 2.00 2.375
C 7595' 1.688
WLM
Trico jet pump cavity
Baker Seal Assy and seal bore extension
Baker K-22 Anchor Seal Assy
Baker "FA-I" packer
Short String
Crossover, 3-1/2" Buttress Box x 2-3/8" EUE 8rd Pin
Pup Joint, 2-3/8" EUE 8rd
6' Tbg perf gun stuck in short string, 21.5' long total
fish
PERFORATION HISTORY
Interval Accum.
Date Zone Top Btm Amt spf Comments
...... 1/_9~Z ........ 9:_3_ ......... _8;2_.1_6'__ ........ _8_,_2-.-6_6' .......... _$.0_'_ ............ _4_ ........ _S_ q. .u_ ..e g_z_e__d__7.-~ l :.8_6_ ..........
...... _1/9_F(._7_ ......... _C_-.3___ __._8_,.2__7..0.' ....... 8_,_2.9_6'__ ....... _2._6.'__ .......... __4_ ....... _S_queezed 7-31-86
1/9/77 .... C_-_4_. 8,307' 8,340' 33' 4 Squeezed 7-31-86
11/22/98 C-5 ........... -8,_4.6_7.:' ........... _8,__5_8__9.'_ ..... 122' . ........... .8 ....... _R__eP_~_rf_,?_l./_8-EJ_,.._O___d.e_g-_.
11/22/98 C-5 8,635' 8,660' 25' 8 Reperf, 2-1/8" EJ, 0 deg.___
11/22/98 C-5 .... .8.:_6_7__8.'- ...... _8_, 7__4_ .4. . ~_ ......... _6_6.'_ ......... _8_ ...... _R_e. ped, 2-1/8" EJ, 0 deg: .....
11/22/97 C-6 8,973' 9,000' .___2.7_'__ ........... _.8_ .......... R__epe__d.,_2-1___/..8"lEJ_,_O__d_eg:.__
11/22/97 C-7 9,485' . ..... 9,__5_30__~_' ........ _45-- .......... 8 .......... _ReDed, 2-1/8" EJ, 0 deg__.
11/22/97 C-7 9,540' 9,795' 255' 8 Reperf, 2-1/8" EJ, 0 deg__
11/22/98 _.._C.:_7_ ..... ___9_;..8.._8__0--_ 9,955' 75' 4/8/12 Rep_e_rf,__2-1/8" EJ, 0 deg_._.
C-7 9,956' 10,045' 89' ___.4_/._8_ ..... Re_perf 3/31/85.
PBTD = 10,310' TD = 10,860'
MAX HOLE ANGLE = 25° @ 6,200'
Anna 26 1-23-99 final dwg.doc DRAWN BY: TAB 05/08/02
7. iG RELEASE: ·
:-?_. LL DATA
Casing: ~gl~
Hole Size
M~---C~3/~!C;T. iNTEGKITY - P.AllT f!.
TVD; Sec ar.
'-aeore cica.1 TOC '
.'~,~\ ,. .
"roe..(;,-,,.., x~%,~.,~s,~,,-s.,~ .'-. %mo'..~.~,,,.:.,.,> -,,,... ,,sa. ~~ ~0~ ',-,~'v..~.
I'
Cemen: Bond Log (Yes_._ or No) ~ ;.,,I,n. AOGCC_~:,...,..,,, ~., Fi!e_~_~_~__ '
%., ·
~'~ i ....
Produc:ion Lo§:., TTp. e
t Evalua=ion
~ONCLUS iONS: ...
:
~" . i
Par: I1: ' '
.,
· .' - ,rC~"'-frr( '%0-0o
NOTE TO FILE
In Re: Anna 26 (18742 #26)...PTD (176-077)
Unocal has applied to convert this production well to an injector. Since the well does not
have a packer in it, MI demonstration must be by other means.
The well was drilled in late 1976 into early 1977. Lost circulation and several kicks are
reported while drilling at 8211'. Casing was eventually set at that depth. The cementing
summary is pretty complete. A temperature survey was run that indicated TOC at 6919'.
After drilling out, lost circulation was again experienced. Losses were cured and 8-1/2"
hole was drilled to 10344' where returns were lost again. 7" liner was eventually set at
this depth. It is not noted if any sort of liner packer was run. No cement was reported
above the liner top and it is noted that while returns were generally good, it was believed
at least 40 bbls were lost running and cementing the casing. A bond log was run with
the following comments reported, "Run CBL 10318'-7700'. TOC @ 8800'...good bond
below 9050'... fair to good bond 9050'-8800'... little or no bond above 8800'." This bond
log is available in the AOGCC files. The well was drilled deeper, but eventually PBTD
was established by setting a retainer at 10310'. The well was completed in February
1977 pumping 673 bopd and 2 bwpd.
A workover to clean-out the well and change the pump BHA was performed in
December 1983. In April 1985, the pump BHA was changed again and zone C-8 re-
perforated.
In July 1986, a workover was performed to shut off a dramatic increase in water
production and investigate casing integrity. After pulling the completion, a tight spot was
encountered at 8254'. The casing was swedged out from 4-7/8" to 5-7/8" plus. Squeeze
work commenced. Prior to squeezing, the annulus was tested to 2000 psi above an
RTTS set at 7784'. 3 squeeze operations were performed with increasing pressures
noted on each operation. After squeezing, the well was pressure tested above firm
cement at 7850'. 230 psi was lost in ~ hour. As drill out proceeded, additional pressure
tests were done. The well would loose pressure with the trend to decreasing pressure
loss, however on the final test the overall pressure loss was nearly 700 psi in 30
minutes. The well was then completed. The work was partially successful. The oil rate
was increased from 208 to 365 bopd and the water rate was reduced from 880 to 503
bwpd.
Recent work on the well includes deploying a coil tubing jet pump in the short string in
November 1995. Sometime after August 1997, a snubbing unit was used to pull and
recomplete the well. Apparently, the coil jet pump was removed during that operation,
however little information is in the file for this work. In January 1999, a coil tubing
deployed jet pump was installed in the long string. It had been planned to be installed in
the short string, however a perforating gun was lost in the short string in the early stages
of the job. When that work was completed, production was reported at 82 bopd and 228
bwpd.
As noted, a copy of the CBL run in late 1976 is available in the AOGCC files and Unocal
has provided Xerox copies of the log. Examination of the log shows initial amplitude
response for the 7" liner cement to be slightly below 8200'. From 8200' to 8385', Iow
amplitude response is primarily limited to the casing collars. The interval 8385'-8418'
exhibits the lowest amplitude between 8200'-8800'. Below 8790', the amplitude is
generally Iow. A short section of the 9-5/8" casing above the liner top is presented on
the log. Very Iow amplitude is shown, which would indicate excellent bond.
Based on the bond log analysis, the remaining open perforations were effectively
isolated when the well was drilled. During the 1976 work, no attempt was made to
squeeze below 8370'. Although casing damage was discovered in the upper intervals, it
is indicated that the squeeze work performed at that time was successful in shutting off
some of the water production. Although a tight pressure test was never accomplished,
the increasing squeeze pressures and the trend of decreasing pressure loss when
testing during drillout are good indications of isolation. Based on the operational
summaries and the bond log, MI is indicated.
Subject to Unocal complying with the requirements of the attached "Procedures to
Obtain Variances on Packerless Wells (version 4) February 9 2000", I recommend
approval to convert Anna 25 (168-036) as proposed.
Tom Maunder
Petroleum Engineer
GRANITE POINT
ADL 18742 WELL NO. 26
MIDDLE K£NAI SANDS
Pertinent Data:
Spud Date:
Surface Location:
Subsurface Location:
Elevation:
TD:
PBD:
Casing:
Perforations:
Original
1-09-77 -~
Reperforated
3-31-85
Initial Potential:
Initial Stimulation:
Reservoir Data:
Cored Intervals:
DST Interval s
and Resul ts:
Log Inventory:·
October 15, 1976
Leg 4, Slot 8, GP Platform Anna
771' FNL, 713' FEL, Sec. 12, TION, R12W, S.M.
TD 1014' FSL, 2937' FEL, Sec. 1, TION, R12W, S.M.
105' KB-MSL
10860' MD, 10377'
10,310' MD, 9831'
20", 74~ CSA 622' x cement to surface
13-3/8", 54.5# CSA 2022' x cement to surface
g-5/8", 43.5 & 40# CSA 8004' x 700 sx
7", 26#, N-80 liner 7728-10336' x 500 sx
fi-38216-8266'~C-68975-9000"~£C-89895-10045'-/~°
8270-8296Y .~ C-7 9485-9530'}
-~ 8307-8340" 5~ 9540-9795'~ ~
- 8469-8589~ 9888-9895~
a637-s660~~
8680-8744~ 4jSPF Dresser Atlas
C-7 9885-9895'
C-8.9895-10045' Baker
673 BOPD, 2 BWPD, 837 MCFD
Spot 1570 gal. 15% HC1 over perfs 9888-10,045'
Spot 3000 gal. 15% HC1 over perfs 9485-9745'
Spot 250 gal. 15% HC1 over perfs 9475-9000'
Spot 2070 gal. 15% HCl over perfs 8469-8744'
Core ~1 - 8470-8490' - C5
Core ~2 - 8495-8500' - C5
Core #3 - 10841-10860'
DST ~1 10302-10683' Rec. 19 gal. SGCM
IES 8000-10336'; 10338-10830'
GRS 7211-10826'
GRD 8000-10660'
Temp surface-8211'
Gyro 1800-7500; 8100-10318'
CBL-GR-CCL 7700-10318 (CBL 140-2052)
Dipmeter 8000-10336'
STATE OF ALASKA
ALASKA O( L AND GAS CONSERVATION',..,OMMISSION
APPLICATION FOR SUNDRY APPROVALS
ipe of Request:
Abandon: Suspend:
Alter casing: Repair well:
Change approved program: Pull tul~ing:
2. Name of Operator
UNION OIL COMPANY OF CALIFORNIA (UNOCAL)
3. Address
P.O. BOX 196247 ANCHORAGE, AK 99519
4. Location of well at surface
771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM
At top of productive interval
595' FSL, 2471' FEL, Sec. 1, T10N, R12W, S.M.
At effe~ve depth 10,310'
Operation shutdown: Re-enter suspended well:
Plugging: ,/Time extension: Stimulate:
Va"~ance:,A Perforat-~'.'-: Other:. X
5. Type of well:
Development: X
Exploratory:
Stratigraphio:
Sewi~e:
AUG 2 i 2000
953' FSL, 2898' FEL, Sec. 1, TION, R12W,
At total depth Ataska 07; & Gas Co;re. C0mmiss~n
1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M. Allc~oi'a~e
'¥2. Present well condition summary
Total depth: measured 10860' feet ~' Plugs (measured)
true vertioal 10377' feet
6. Datum elevation (DF or KB)
105' KB MSL feet
7. Unit or Property name
Granite Point 18742
Middle Ground Shoals
8. Well number
26
9. Permit number
10. APl number
50- 733-20297-00
11. Field/Pool
Middle Kenai 'C' Sands
Effective depth: measured 10810' feet Junk (measured)
true vertical 9831' feet
ORIGINAL
Casing Length Size Cemented
Structural 622' 20" 1285 ax
Conductor 2022' 13-3/8" 1600 ax
Surfaco 8004' 9-5/8' 700 ax
Intermediate
Produotion
Uner 2638' 7' 5O0 ax
Perforation depth: measured .... See Attachment
Measured depth
622'
2022'
8004'
10836'
True vertical depth
622'
1990'
7600'
9857'
true vertical See Attaohment
Tubing (size, grade, and measured depth)
Paokere and SSSV (type and measured depth)
Short 3-112', N-80 @ 7638
Long.3-1/2' N-80 0 10860'
Halliburton TBG PKR 0 7543'
1.75" 1.91# QT-700 Coiled Tubing @ 7518"
13. Attachements Description summary of proposal:
Conversion to injector. ,
14. Estimated date for commenoing operation
16. If proposal well verbally approved:
Detailed operations program: BOP sketch:
,1 11
16. Status of well olassifloation as:
Oi1: Gas: Suspended:
Name of approver Date approved Service:
1'7. I hereby oortify~ true and correct to the best of my knowledge.
Signed:
" ' V' FOR COMMISSION USE ONLY
·
Conditions of approval: Notify Commission so representative may witness IApproval No. Plug integdty~_ . BOP Test ... Location clearance
·
Mechamcal Integrity Test ~f~ Subsequent form required 10-
ORIGINAL SIGNED BY
D Taylor Seamount
Approved by order .of the Commissioner Commissioner
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
Procedures to Obtain Variances on Packerless Wells
(version 4) February 9, 2000
It is preferred that wells have been shut-in for an extended period of time.
Injection fluid will normally be filtered Cook Inlet water at ~55 deg F.
1. Do.a base line temperature profile from'surface to top of perfs.
2. Start injection - after 14 days, run a standard step-rate-test per SPE
recommended procedure. Run test to maximum allowable pressure. Repeat
step-rate-test after injection pressures have stabilized.
3. After 30 days of injection, run a temperature profile making stops as in the
baseline survey (if appropriate) and hang recorder in well.
Note: if the Stops used in the baseline profile are not appropriate, make
appropriate stops in this profile and use in all subsequent surveys in this
well.
4. After 48 hours, retrieve recorder and run a temperature profile from the perfs
to the surface using the appropriate stops.
5. After retrieving the recorder,' run in hole with high speed recorder which was
used for Step #1.
6. Compare the series of profiles to the baseline.
7. Evaluate ali data from the temperature profiles and the step-rate-test to
determine if the there are indications of leaking casing and or upward flow behind
the casing.
8. If the conclusion is that there are no casing leaks above the zone and no
upward flow behind the pipe, the well can be put back on injection.
9. Daily injection 'rates and tubing and surface casing pressures will be recorded
daily and reported to the AOGCC monthly.
10. If injection rates or pressures or surface casing pressure indicate the
possibility of a casing leak, the well will be immediately shut-in and the AOGCC
notified; future operations will then be as agreed.
11. The well will be tested every two years for mechanical integrity as in the
above steps or by another procedure acceptable to. the AOGCC.
UNOCAL )
,: Anna
ii..
Well No. 26
Actual Jet Pump Completion ns of 1/23/99
RKB to TBG Head = 33'
:. ;., CASING AND TUBING DETAIL
SIZE wr GRADE CONN ID TOP BTM.
20" 74 ]-55 Sm'~_~ 622'
13-3/8" 54.5 ]-55 12.615 Surfa~ 2,022'
9-5/8" 40 & 43.5 N-80 & S-95 BTC 8.755 Sm'face 8,004'
7" 26 N-~0 BTC 6.276 7728' 10,336'
LS 3-1f2" 9.2 L-80 BTC SC 2.992 34' 7,761'
SS 3-1/2" 9.2 1-80 . BTCSC 2.992 34' 7,632'
2" .156" wall I-IS-S0 Coil 'I"og 1.688 32' 7541'
·-: .. JEWKLRY DETAIL
]~'O'-' Depth ID OD Item
1 50.3' Oumtx~ DCB, Tubing Hanger, 3-1/2" x 11", SM, 3-1/2',
EUE Lift Tbtv. ad x Butt. 8mpemion Thread, Type "H"
Omsover, 3-1/2" Bu~.ss Box x 3-U2" EUE 8~ Pin
Kobe Cavity, 3" ~ Type 'B', Parallel Dbl. SN: 231-I-10-97
Crossover, 3-1/2" EUE 8rd Box x 3-1/2" Butlze~ Pin
3 its, 3-1/2", 9.7~, L-80, Buttress Tubing
V~tmline Entry Guide, 3-1/2" Buttress Box
(
Cavity
leak
identified
7/25/98
= Fish
Tubing
7585'-7591
7,642' 3.00 3.865
7,643' ~ 6.50
7,665' 3.00 4.50
7,666' 2.992 3.5
7,761' 3.00 4.25
7526' 1.62~' 2.2?0"
7540' 1.300' 2.750"
?$41' 1.44~' 2.200"
7541' 1.375" 2.765"
A 7,632' 2.00 3.865
B 7,633' 2.00 2.375
C 759S' 1.688
WLM
Trico Jet pump cavity
Baker Seal Assy and seal bore extensi~
Baker K-22 Anchor Seal Assy
Baker "FA-I~ packer
Short Strinn
Crossover, 3-1/2" Buttress Box x 2-3/8" EUE 8rd Pin
Pup 3oint, 2-3/8' EUE 8rd
6' ~ ~ gan stack in short sh-Jn~ 21~' long total
6
tagged @ _
9,962'
7n~/~8 _-
2.25 GR
-.
,
Anna 26 1-23-99 final dwg.doc
PERFORATION HISTORY
Intewal Ao~um.
Date Zone Top Btm Amt, spf Comments
1/9/77 C-3 8,216' 8,266, 50' 4 Squeezed 7-31-86
1/9/77 C-3 8,270' 8,296' 26' 4 Squeezed 7-31-86
1/9/77 C-4 8,.30,7' 8,340' 33' 4 Squeezed .7-31-86
11/22/98 C..5 8~467' 8~589' 122' 8 Reper[ 2-1/8' EJ~ 0 deg.
11/22/98 C-5 8~685' 8,660' 25' 8 Reperf, 2-1/8' EJ, 0 deg.
11/'22/98 C-5 8,678' 8~744' 66' 8 Reperf~ 2-t/8' EJ, 0 deg.
11/22/97 C,-8 8,973' 9,000' 27' 8 IRe@eft, 2-1/8' EJ, 0 deg.
11/22/97 C-7 9,485' . %530' 45' 8 Reper[ 2-1/8' EJ~ 0 deg.
11/22/97 C-7 9,5.40' 9,795' 255' 8 'Reperf, 2-!/8' EJ. 0 deg.
11/22/98 C-7 %880' 9,955' 75' 4/8/12 Reperf. 2-1/8' EJ, 0 deg.
C-7 9,956' 10,045' 89' .4/8 Reperf 3/31/85.
,
PBTD= 10,310' TI)'= 10,860' ~"~! ....... % ~,,,[~'~,~ ' ~*'"' ~ '~-'~' F~'~
HOLE ~GLE = 25° ~ 6~00'
AUG 2 1 2000
MD
Zone Top Btm
C-3 8,216' 8,266'
C-3 8,270' 8,296'
C-4
C-5
C-5
C-5
C-6
C-7
C-7
C-7
C-7
8,307' 8,340'
8,467' 8,589'
8,635' 8,660'
8,678' 8,744'
8,973' 9,000'
9,485' 9,530'
9,540' 9,795'
9,880' 9,955'
9,956' '10,045'
Anna 26 Perforations
'I'VD Subsea
Top Btm Top Btm
7,793' 7,839' -7,688' -7,734'
7,849' 7,867' -7,744' -7,762'
Amt
7,877' 7,914' -7,772' -7,809'
8,027' 8,139' -7,922' -8,034'
8,187' 8,215' -8,082' -8,110'
8,224' 8,291' -8,119' -8,186'
8,513' 8,542' -8,408' -8,437'
9,011' 9,060' -8,906' -8,955'
9,070' 9,317' -8,965' -9,212'
9,405' 9,475' -9,300' -9,370'
9,475' 9,564' -9,370' -9,459'
Comments
50' Cmt Sqz'd 7/31/86
26' Cmt Sqz'd 7/31/86
33' Cmt Sqz'd 7/31/86
122'
25'
66'
27'
45'
255'
75'
89'
RECEIVED
Description Summary to Convert Anna Producers into Injectors
Anna 21
Gage Tbg.
Run "Baseline" Temp Survey.
Place on injection for 1 month.
Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
Anna 25
· Gage Tbg.
~li.~:" Temp Survey.
· Place on injection for 1 month.
· Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
Anna 26
· Gage Tbg.
· Run "Baseline" Temp Survey.
· Place on injection for 1 month.
· Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
Anna 32
· Gage Tbg.
· Cut Tbg to drop guns.
· Gage ring tag guns.
· Run "Baseline" Temp Survey.
· Place on injection for 1 month.
· Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
Anna 37
· Gage Tbg.
· Run "Baseline" Temp Survey.
· Place on injection for 1 month.
· Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
Anna 38
· Gage Tbg.
· Cut Tbg to drop guns.
· Gage ring tag guns.
· Run "Baseline" Temp Survey.
· Place on injection for 1 month.
· Run Temp survey. Compare to "Baseline" Temp Survey to pass MIT.
A~aska 0;: & Gr,~s Co;:s. Co;r..,~ission
Anchorage
/
: !
11
44-11
./ I /
!
/ / /
//
/ //'
3 t / / I'
.,/ // ~
I
I / /
I / .,
!
/ / I
·
31, / /
·
/ !
,' /
/ / , .,.
I 32;
/
/
/ // /
/ / /
~ /
/
/ /
·
./ I
I
!
,. / / / / /
,, , , /; / /
/ / , i //'//
f i , ; /// / ,
i ~ . I i,! / /
/. , / / / /// / /.
,~r., 7RD2.' / ~ ~ ; ; !
! :.a ' , ,'; / I / /
K"~ ~.' I , ~ ,i / ; /,
· i .: / / . ;
/ ~./, : / , ~ t, ,, t , I
~ '_J.'~ ! I i i I ! i / ! t ~
"'7 / t ////// ///
. , / ,;, i ,
i i I / : i ii ! // /
/ / / / / /// / // /
i / ~ / / / /;' / t/ I
/ / i .. i i :' i ,/ I / ,'
, I ! i / , / /
-.:---.C37/ ; , ,'/ ; / / / /
i 1"*; i ! i ! i / , / ,
, ! ~ / ! i i I / / // /
, / / i / i / i ., .;/ /
/ i / ! ! ,'! / // /
· I I I I / I . / /
~./ / ' I I ; ,/ / II /
~; / / / , .,- 1/ /
' /~-." ~i'/ ," /I /
;' / I ,'~-. ; I/' /
' , / I I I //
,',// ,,,, / dx','
~ ! / / / .'! i(///
'/ ~ , ///
· / / // t/
~ , I/ /
////. ..,,/,,
;
/
///
/
i/ ,/
/ / /
/ / /
/ / /
/ / /
// /
.,' ,, / / / / /'
, / . ,, /
..," / .,/ / .; , ,i /
./ / / / / / / / /
/ I / 1/ / / / / /
, ,'",, ,"- / '"'/ "/ "/ '"/
;' ii /' /' / / -'/ , / // / / ,/ /
,,,(_ ,.-' .... ,,,,, ,/, ,// / / / / ,,, ,/ / ,,,, ~ ~.t...,,,.,~4 v
i ! , ...... , / -- , , , , ,
i -~ /' / / / / / / / / / / ~,.
/ I :' "'" "' /' ' / / /" '/ " ,' ," AUG 21 ,0~.,0
// / ~..."'.,~' // /' /' _/ / / / / ! / / , ' "
//i " ..... "~' '"' '" ' " " / '" / / ' "
.......... -/" .... ." / -' / / ' / -' / ' Alaska Oi{ & Gas Cor'~s.C~mmission
i ~ ..... - ,.. / / . I / / / / / / /
'i ~,_,....,.--'"' ......" ..,' ..../ / / ./,, / / , ,, Anchorage
,, ~. /~..-.."' . ..... ../ .......... / I ,' / / , , / / ,
'.....//...-'" ..:...:; ....... // ,. / ,' ,, ,, ,, ,,'
i ! /~' ....... ..,,.: .... .,/ / / / / / / , ,.
~ { STATE OF ALASKA (
.. ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY' WELL OPERATIONS
1. Operations performed: Operation shutdown: Stimulate: Plugging: Perforate:
Pull tubing: Alter casing: Repair well: Other: X
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
Unocal Development: X KB 105' above MSL feet
3. Address Exploratory: 7. Unit or Property name
P. O. Box 196247 Strafigraphic:
Anchorage, AK 99519-6247 Service: Granite Point 18742
4. Location of well at surface 8. Well number
771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM Anna-26
At top of productive interval 9. Permit number/approval number
N^ '-/0' o'77.
At effective depth 10310' 10, APl number
963" FSL, 2898' FEL, Sec. 1, T10NR12W, SM 50-733-20297
At total depth 11. Field/Pool
1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, SM Middle Kenai 'C" Sands
12. Present well condition summary
Total depth: measu red 10860 feet Plugs (measu red)
true vertical 10377 feet
Effective depth: measured 10310 feet Junk (measured)
true vertical 9831 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 622' 20" 1285 sx 622' 622'
Surface 2022' 13-3/8" 1600 sx 2022' 1990'
Intermediate 8004' 9-5/8" 700 sx 8004' 7600'
Production
Liner 2608' 7" 500 sx 7728'-10336' 7343'-9857'
Perforation depth: measu red
8467'-8589', 8635'-8660', 8678'-8774', 8973'-9000', 9485'-9530', 9540'-9795', 9880'-10045'
true vertical
8033'-8148', 8191 '-8215', 8232'-8323', 8516'-8542', 9016'-9060', 9070'-9321 ', 9405'-9568'
Tubing (size, grade, and measured depth)
3-1/2" long string, 9.2#, L-80 @ 7761', 2" HS-80, .109" wall coil tubing @ 7541'
Packers and SSSV (type and measured depth)
Baker 2" x 3-1/2" FA-1 Perm Packer @7541' in the long string
13. Stimulation or cement squeeze summary ~.L~. ~
Intervals treated (measured) ~[S~'~ C.iJ &,~ ._Gas Cons. Commission
Treatment description including volumes used and final pressure
14. Representative Daily Averaqe Production or Injection Data
OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 0 0 140 3500 jet pump
Subsequent to operation 82 228 140 3500 jet pump
15. Attachments: 16. Status of well classification as:
Copies of Logs and Surveys run:
Daily Report of Well OperaUons: X Oil: X Gas: Suspended: Service:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge:
ORIGINAL
Signed: ~~~/ Title: Drilling Manager Date:
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE ~
®®
Anna
Well No. 26
Actual Jet Pump Completion as of 1/23/99
RKB to TBG Head = 33'
= Fish
Tubing
Holes
7585W591
SIZE
CASING AND TUBING DETAIL
Vcr GRADE CONN ID
20' 74 J-55
13~3/8" 54.5 J-55
9 5/8" 40 & 43.5 N-80 & S-95 BTC
7" 26 NS0 BTC
Tubing:
LS31/2" 9.2 I. 80 BT(' SC
SS31/2" 9.2 L-80 BTC S(
2" ./56" wallHS-8() Coil Tbg
2 7,642'
3 7.64Y
4 7.665'
5 7,666'
D 7526'
7540'
7541'
ELM
TOP BTM.
Suiface 622'
12.615 Surt'ac¢2,022'
8.755 Surface 8,004'
6.276 7728' 10,336'
2.992 34' 7,761'
2.992 34' 7,632'
1,688 32' '7511'
JEWELRY DETAIL
ID OD Item
EUE Lill Thread x Butt. Suslxmsion Thread, yype "H"
BPVP
3.00 3.865 Crossover. 3-I/2" Buaress Box x 3-1/2" Et't£ 8rd Pin
2t~47 6.50 Kobe Cavity, 3", T)~' 'B', Parallel Dbl. SN: 231 I 10 97
3.00 4.50 Crossover. 3~ 1/2" EUE 8rd Box x %1/2" Buttress Pin
2.992 3.5 3 .its, 3-1/2", 9.2#, I.-80, Butlress Fubing
3.00 4.25 Wireline Entry Guide, 3- I/2" Buttress Box
1.625" 2,27{}" Trico jet pump cavity
1.30t~'2.750" Baker Se'al Assy and seal bore extension
Short Siring
A 7,632' 2.00 3.865 Crossover, 3 1/2" Butlress Box x 23/8" ErE 8rd Pin
B 7.63~' 2.00 2.375 pup Joiat, 2-3/8' EUI': 8rd
C 7595' 1.688 6' Tbg perf gnn st~lck in short s{rillg? 21.5' long
PERFORATION HISTORY
], spf {Comments
1/9/770-3 8 216' 8~66' 50' 4 S~ueezed 7-31-86
1/9/77C~3 8,270' 8,296' 26' 4 ~sHe~ ~ J28
1/9/77_ C~4 ~ 8,307'~ 8,340'. 33'~ 4 ~S~u~Rd. 7-~Jz8
tl/22/98 C-5 8,678'i 8,744'~ 66' 8 Reped, 2-1/8" EJ, 0 de
11/22/97 i C-7 9 540', 9,795', 25~' 8 Roped, 2-1/8" E J,
l t/22/98C-7j 9,880' 9,955' 75'~
C-7 9 956' t0 045' 89' 4/8 Reped 3/31/86,
PBTD = 10,310' 'rD = 10,860'
MAX HOLE ANGLE = 25° ¢~ 6,200'
Anna 26 1-23-99 dwg,doc DRAWN BY: TAB 02/08/99
1/8/99
1/9/99
1/10/99
Anna Well An-26
Daily Summary of Operations
RU slickline unit on AN-21 long string. RIH with standing valve to 5000' and shake off (fluid level at
2400')
RD from LS and RU on SS. Attempt to circulate down LS and up SS but no returns. RU on LS and
and RIH with setting tool to standing valve at 7673'. Jar down to seat standing valve. POOH. Circ
down LS and up SS with 58% returns. RU on SS and RIH with braided line brush dressed to
2.992" x 5' long. Reciprocate every 100' from surface, set down at 2451' and work tool down to
3751', fell free to tubing crossover at 7634'. POOH and circulated down LS and up SS during
brush run.
RIH with 2.80" gauge ring and sat down at 2890', jar free and fell to 3751 ', jar free and fell to
crossover at 7634'. POOH with 2.800" gauge ring.
Circulate down LS with returns up short string (1-1/2 ss tubing capacities). RIH with 2.80" gauge
ring in SS to 7634' while circulating down L$ and up SS at 3A BPM. PU and work area from 3500'
to 4500' while continuing to circ. POOH. Circ down L$ and up SS 1-1/2 SS tubing capacities.
RIH with 2.765" x 3' long dummy gun in SS to 7634' (no set downs but slower from 3500' to 7634').
POOH with dummy gun and circ down LS and up SS 1-1/2 SS tubing capacities.
RU on LS and pull equalizing prong from standing valve at 7658'. RIH and latch standing valve
body at 7658'. RIH with 2.80" gauge ring in L$ to 7643', POOH. RIH with 2.765" x 3' dummy gun
to 7643', POOH.
RD slickline from AN-26. Attempt to pump final flush down SS but SS would not take fluid at 2600
psi.
1/14/99
1/15/99
RU APRS E-line unit on An-21 ss. RIH with 1-9/16" hollow carrier tubing perforating gun, 6' long
and 22 shots. Gun misfired, POOH. Found bad cap and rearm gun. RIH and perf SS tubing at
7585'-7591'. Gun was stuck at 7577' and SS on vacuum. Allow well to equalize and gun was still
stuck. Fluid level in 9-5/8" at 1732'. Drop standing valve in LS. Pumped down LS and pressure
increased to 500 psi before breaking back and fluid returns to surface in short.string and annulus.
Pump 10 bbls down SS and gun still stuck. Resume pumping down LS and work wire to weak
point failure at 1500 lb. POOH with all of wire.
RU slickline on An-26 SS. RIH with short 1" overshot grapple, latch fish at 7599'. Jar on fish with
loss of spang action at times. Sheared off and POOH with no recovery. Repin same tool and latch
fish with same result, no recovery. RIH with 2-1/2" JDC and catch fish at 7595'. Jar for 1 hour with
no progress, jar down to release and POOH. Decide to set packer in long string. Left 21.5' long
fish in short string.
RD from SS and RU on LS. RIH and pull standing valve equalizing prong. RI.H and retrieve
standing valve body. RIH with 2.765" x 3' dummy gun to 7600' with no problems.
RD slickline and RU APRS E-line on LS. RIH with Baker FA 3-1/2" packer. Set packer at 7541' in
long string. POOH and RD APRS.
1/20/99 Spot Dowell coil tubing equipment on board
1/21/99
NU adapter Versatech adapter spool and CT BOPE. Test CT BOPs to 250 psi/4500 psi. Fluid
level in annulus at 2104'. Install Baker CT connector and pull test to 31,000#. MU jet pump BHA
with isolation sleeve on bottom of 2" coil.
An-26 daily summary.doc Page #1 02/08/99
1/22/99
Anna Well An-26
Daily Summary of Operations
Load coil with CaCl and pressure test BHA to 2600 psi. MU Baker Seal ^ssy. Blow down coil with
N2. RIH with coil and BHA to 7400'. Shut down 7 hrs for rest. Continue RIH and latch anchor at
7545' CTM. Pressure test annulus to 1000 psi. Shear out seal assy from upper seal bore with
7500 lb overpull. Retest annulus to 1000 psi. PU 8' and retest annulus to 500 psi. PU and verify
seals are out of seal bore. Sting back into seal bore and retest to 1000 psi. Mark tubing for
spaceout. PU 20' and cut coil, install Versatech hanger and G$ running tool. RIH and land hanger,
pressure test annulus to 1000 psi. Release GS running tool and rig down coil tubing unit.
1/23/99
RU slickline and pull Trico isolation sleeve from jet pump cavity. RIH with standing valve to 2000'
(fluid level at 1850') and drop standing valve. RD slickline. Drop jet pump and begin producing
well.
An-26 daily summary.doc Page g2 02/08/99
.~. -22-97 FRI 01:09 PI1 p,
To --
: Mr. Jack Hartz - AOGGC,
Fmc Dan Williamson
On August 28, 1997, Unocal Alaska will mobilize Hydraulic Well Control's
hydraulic workover unit to Baker Platform to perform a pump and tubing change
on Baker Well 13. Upon completion of this work the unit will be sent to Anna
Platform to perform the same task on Anna Wells.~5, 2_~6, and $8. These wells
are all no flow wells, having no packer or safety valve ~n them.'7' Our data shows
that the Anna wells are extremely subnormal pressured (1,840 psi at 8,200 ft
TVD), have a high water cuts and produce very little gas. The Baker well is
higher pressured but will be readily killed with filtered inlet water; it also has a
high water cut and produces very little gas.
The hydraulic unit will be on each well for a brief time. The wells are not
considered by Unocal Alaska to be a high well control risk. We respectfully
request the following variances be granted:
11
To employ the use of 2", 5M, Steel Molded Lines and Fittings with 1502 ~,,v~
Weco Unions for service as a Kill Line and Downstream Choke Line.
To use the production Iow pressure separator system as opposed to the ,,xx ~~yltx
use of a "Poor Boy Degasser". .
Drilling Superintendent
Post-it® Fax Note 7671 )ate ,~/...,-- I # of · , r
-- ------'- Phone"'~--~
Page 1 of 1
--
p
Unocal Energy Resources D~' ,n
909 West 9th, P.O. BOX 1962,.
Anchorage, AK 99519-6247
Telephone (909) 276-7600
Fax (907) 263-7828
U OCAL
Debr~. Chltders
C~erk
,DAYA TRANSMITTAL
96-13
June 6,1996
....... i i[
To:
IHoward Oakland
3001 Porcupine
Anchorage, AK 99501
[ A!aska Oil & G.as
From:
Debra Childers
909W. 9th Avenue
Anchorage, AK 99519-6247
Unocal
Transmitting the following items.
, , [[
?~1~ Granite Point/"Anna-21 " . :'
fil¢i~ blackline'" COmpletion RecOrd 4/01/96
-0'/1 Granite Point / Anna-26 rrll'm / blackline ~' Tubing Packer Setting"Record 4/20/96
Granite Point / Anna-36 f~, blackline," Completion' Record 5/20/96
l,t~"-Granite Point / 42-23 RDr11"m / blackline.*''' Perforating iDepth Control 2/17/96
~r~"_jTrading Bay Unit K-26 RD film,,/'blackline~' Main Pass (Co!lar Locator) 3~23/96
l~_~_ Trading Bay Unit M-5 ¢if2m / blackline~'.Complet!on Record 2/14/96
Trading Bay Unit M-25 t,B'n / blackline,.- ~:;ompletion Record 4/24/96
~radi~g Bay Unit M-25 ~ifrfl"/blacklinec- ~'ompletion..Record' 4/30/96
Tradi. ng Bay Unit..G-21 ~,,blackline,,~ COL/Gamma Ray 4/03196
Trading Bay Unit G-21 fSrf~ blacklin~,,-" Cement Retainer 4/08/96
Trading Bay Unit G-21 .,fll'm/blackline.," Completion Record 4/13/96
Trading Bay Unit G-21 ~ / bla'ckline~,,,Completion Record " 4/18/96
Trading Bay Unit G-21 f~ / blackline,," Completion Record '] '4/22/96
Trad[ng Bay Unit G-21 ~ffflm / blackline~- Completion Record I 4/25/96
Trading ~,a~/Unit G-21 6i~/blackline--" Completion Recordl2 I/8 Fnerget "°~";~-'- i' '"': TM''';~'''' ~'''~
Trad!.ng Bay Unit G,21 d,~ / blackline,.,-Gamma Ray/TemPerature ~ 4,'i0/-~6
Trading Bay Unit G-21 ~4¢'r~ / blackline'''' Tubing Cutt. er 4/08/96
,"~,,,., ~, ~,/'
-,.,,.~.,.-, ,~, ~J ¢ ~z :~ ff:l .-'4 J ¢!1'm / blackline,.- Completion, Record 5/17/96
· ,,
, ,,
i
~e.c¢iv~.d hy-Please acknowle~/~~Tipt by ygningi~l~jandptuming~] one ~opy.of this ~ansmittal[Date:or F~ to (907)263-7828jU~ ~]
": ...."~' ~'" ' "' "'"'"' '"':"'""'""':' :':?:' "? ?""'" ' L=:~' ";:?"~~' "' ...... ';'-"" ::"'":""' "" "' ':~'" ""'d'~'"'"
~'.;'. ....... ..... ,~';. ,;C.E.~ ... ,..:. :~.~........ ;.; ....... ;'~, ;~.~¢'~;...~:,'~;,~,~';~..~,..~..~.~,~ ~ .~ ,..~ ~. ..~, ~,.~.~,~,.~t~.~..:,f..~ .~ ~' ...-~-,~ ..... ..~.,,~... v ...- .,......,.,~, ,. ,.,...,.' ...................
,. ............. .,,~; ........................... ,,.,,.,,~.::,.,. ...... ,~,. ,.,,.,~ ............. ,,,~,.,,~ .... ..,,~~~ ~ ........... ,, ............ . ............ ~.,., .......... ....~ ....;.......- ....
...:. ...... ......... ....,..:,:...... .......... ........ ........ . ............. _, ............ . ...... . ........ , ........
. . . .. . . . . .. .... ...........,.......,..~., ,.........,.~,.' :, (.... %;...,.; ...,...;.;..;~. ,.,:.~ ,..'..~,,~.,. =. ;,, ,,,..,,.;..,..,.; ,,;,,:..., .: ....... :,-., ,~.. ;......, '.~.,............. ., . ...... .. . ................................................. ;.:~" .' ~. ... .. .,,..¢ ..
~,¢ ~,~.~`~.=,~=~.=..~¢~=~.~=;..&~~~*~¢~~1~¢=~.~=.~¢~¢.~....~`..~==.:Y~=.....~. ....... ..:.~... ........ .....:..,.,....:.....,~.......:..........,=,....: ......... .~;~,~.~....
J:~.~'(.:"".i"~' '~.','' :":....W"'.ft'..';..'..": ";."..'":'~"~,~t~'.:~%~¢'.~; ...... '+" "*" '''f ''t> '' ~"' ''
Unocal Energy Resources DJ[
909 West 9th, P.O. BOX 196247
Anchorage, AK 99519-6247
Telephone (909) 276-7600
Fax (907) 263-7828
Jn
UNOCAL
Debra Childers
Clerk
DATA TRANSMITTAL
96- 5
February 21, 1996
i
To:
Larry Grant
3001 Porcupine
Anchorage, AK 99501
Alaska Oil & Gas
From:
Debra Childers
909 W. 9th Avenue
Anchorage, AK
Unocal
99519-6247
Transmitting the following items.
GP A'26 BLACKLINE/FILM 2/14/96 TUBING PACKER SETTING RECORD
A26 COIL TUBING W/O
GP 42-23 RD BLACKLiNE / FILM 2/11/96 COMPENSATED NEUTRON / GR z..-
,,
GP 42-23 RD BLACKLINE / FILM 2/08/96 SQUEEZE PERFORATING RECORD ..~
GP 4~2'-23 RD BLACKLINE / FILM 2/~38/96 DRILLPIPE CONVEYED GAMMA RAY
GP 4.2723 RD BLACKLINE / FILM. 2/11/96 CEMENT EVALUATION LOG / GR~
II I I
Please acknowledge~cej~t by sig~ng
Received by: ~ ~
~nd_re~ing one copy of this transmittal or FAX to (907) 26~-~'-~8 ~ _ ~,~,~.
' I"L~' ~,~ I;3~I
Date:
STATE OF ALASKA
ALASKA 011~...,qB GAS CONSERVATION CON(',...~SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown Stimulate Plugging
Pull tubing After casing Repair well
2. Name of Operator
UNION OIL COMPANY OF CALIFORNIA (UNOCAL)
3. Address
P.O. BOX 196247 ANCHORAGE, AK 99519
4. Location of well at surface
771' FNL, 713' FEL, Sec. 12, T10N, R12W, SM
At top of productive interval
At effective depth 10,310'
953' FSL, 2898' FEL, Sec. 1, T10N, R12W, S.M.
At total depth
1014' FSL, 2937' FEL, Sec. 1, T10N, R12W, S.M.
Present well condition summary
Total depth: measured 10860'
true vertical 10377'
Effective depth: measured 10310'
true vertical 9831'
12.
5. Type of Well:
Development
Exploratory
Strafigraphic
Service
Perforate
Pull tubing Other X
6. Datum elevation (DF or KB)
105' KB MSL
7. Unit or Property name
Granite Point 18742
8. Well number
26
9. Permit number
~ ~-77
10. APl number
50-733-20297
11. Field/Pool
Middle Kenai "C" Sands
Plugs (measured)
Junk (measured)
ORIGINAL
Casing Length Size
Cemented
Measured depth
True vertical depth
Structural 622' 20"
1285 sx
622'
Conductor 2022' 13-318' 1600 sx
2022'
Surface 8004' 9-518" 700 sx
8004'
7600'
Intermediate
Production
Liner 2608'
7" 500 sx 10336' 9857'
Perforation depth:
measured
true vertical
See attached
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
ShOrt 3-112", N-80 @ 7638
1.75" 1.91# QT-700 Coiled Tubing @ 7518'
Long 3-112" N-80 @ 10060'
Halliburton TBG PKR ~ 7543'
13. Stimulation or cement squeeze summary NIA
NOV 0-3 i99'5
Atast~ Oil .& Gas ,Cons. Comn
, 'Anchoraoa
Intervals treated (measured) N lA
14.
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Data
Tubing Pressure
Prior to well operation Nov. 9, 94 376 98 248 250 2993
Subsequent to operation
102 373 372 100 3390
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil x Gas Suspended Service
17. I hereby certify that the foregoing iR true and correct to the best of my knowledge.
Signed G. Russell Schmid~_~._~~.~b Drilling Manager Date November 7,1995
Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE
'ANNA Btform
Leg 4, Conductor 8
Tyonek S~:nds
AN 26-2
Granite Point Field
APl 50-753-20297-00
,,. ADL 18742
Tbg H~ r ng Depth 32,00 Ft,
Mox. Dev. At Perfs. 21 Deg.
40,0- 622.0' 20" OD 74.00t/ft J-55 CS(;
56,7-2022,0' 15,575" OD 54,50~/fl J-55 PROD CSG
52,0- 200.9' 9.625" OD 45,50t/ft S-95 PROD CSG
200,9-4464.7' 9.625" OD 40.OOt/ft S-95 PROD CS(;
4464,7-8001,5' 9,625" OD 45,50t/ft S-95 PROD CSG
7728,0- 10556,0' 7,000" OD 26.00t/fi N-80 LINER
10059.5' 5.500" OD 9.20~/ft N-80 TB6 LONG STRING
55.0-7626.8' 5.500" OD 9.20t/fl ~G SHORT STRING
7628.0- 7657.9' 2,575" OD 4.60t/ft lBO SHORT STRING
55.0 - 7518,6' 1,750" OD 1,552" ID lB(; COILED TBG
7518.6 - 7546,0' 2,200" OD 1,610" ID lBG CT COMPLETION
t, lOV 0 8 1~95
Oil & I~as Cons. ComTnissio~
Anchorage
KB ELEV: 105'
PBTD: t0510'
TD: 10860'
Pumpin9 Oil Well Spud On 10/15/76
Lest W/O 4/19/95
ANNA F'lalform
leg 4., Condudor 8
yonek Sands
AN 26-2
Granite Point Held
APl 50-733-20297-00
,,.. ADL 18742
Tb9 H~u~ r'n9 Depth 32,00 Ft.
Max. Dev. At Perfs. 21 Deg.
Z~5.0 - 7656.7' 5.500" OD 9.20t/ft N-80 TBG LONG SI'RING
33.0- 7626.8' 3,.500" OD 9.20t/ft TB6 SHORT STRING
7628.0- 76,],7.9' 2Z" OB 4.60t/ft TBG SHORT STRING
33.0 - 7518.6' 1,750" OD 1.532" ID TB6 COILED
7518.6 - 7546,0' 2.200" OD 1,610" ID 'i'B6 Of 60MPLETION
NOV 0-3 /995
Atas~ Oil & Gas Cons. Commissio~
Anchorage
KB ELD/: 105'
PBTD: 10:310'
TD: 108[~0'
Pumping Oil Well Spud On 10/15/76
Lost W/O 4/19/95
ANNA P atform
Leg 4, Conductor 8
Tyonek Sands
AN 26-2
Granite Point Fie d
APl 50-7~5-20297-00
,- ADL 18742
Tbg H~u. Flng Depth 32,00 Ft.
Mc~x. Dev. At Perfs. 21 Deg.
33,0 - 7518.6' 1.750" OD 1,532" ID TBG COILED TBG
7518.6 - 7520.6' CROSSOVER Baker Coiled 1'bu. Connector
7518.6 - 7546.0' 2.200" OD 1.610" ID 'I'BG CT COMPLETION
7,524.5- 7525.4' 1.900" OD 1.149" ID LANDING NIPPLE Hallburlon "N" W/C Pump l
7529,4 - 7530.0' 2.200" OD CROSSOVER 1,90I' NU lORD B x 1.25" EU P
7530.0 - 7532.4' 2.75" OD 1,377" D HYDRAULIC PUMP Trico Jet Pump Cavity
7552.4 - 7533.0' 2,500" OD 1,100" D CROSSOVER 1 1/4" NU P x 1.9" EU P
7555,0 - 7534.0' 2.575" OD 1,755" ID SEALS MSN Se~l Unit
7553.0 - 7540.5' 2.800" OD 2,380" ID PBR S~LS
7554.0 - 7535.0' 2.375" OD 1,735" ID SEALS MSN Seel Unit
7555.0 - 7557.0' 2.750" OD 2,380" ID PBR SEALS Seel Extension
7555.0 - 7557.0' 2.575" OD 1,735" ID Seel Ex'[.
7537.0 - 7538.0' 2.375" OD 1,755" ID SEALS MSN Seel Unit
7539.0 - 7539,6' 2,575" OD 1,065" ID PLUG Pump Out Pug
KB ELEV: 105'
PBTD: 10510'
'I'D: 10860'
754L4 - 7545,8' 2,765" OD 1.310" D PACKER H(]llibur[on Repe(]b Tbg. Perch
7543.4- 7545,8' PERFSUB
7545.8 - 7546.0' 2,650" OD BULLPLUG [:'.. ,. ,, ~,., ii.: 12
[~:OV 0 8 i995
.Oil .A Gas Cons. C.o. mmiss]~
'Anchorage'
Pumpng OI Wet Spud On 10/15/76
Lest W/O 4/19/95
11. Perforations
~.c-4
C-5
C-6
C-7
C-8
Measured Depth
8,216-8,266
8,270-8,296
8,307-8,340
8,469-8,589
8,637-8,660
8,680-8,774
8,975-9,000
9,485-9,530
9',540-9,795
9,880-10,045
True Vertical Depth
7,798-7,845
7,849-7,873
7,883-7,914
8,035-8,148
8,193-8,215
8,234-8,323
8,518-8,542
9,016-9,060
9,070-9,321
9,405-9,568
f,~OV 0 8, i995 '
& Gas Cons.
Anchorage
ANNA 26
DAY 1 (4/16/95-04117/95)
RU ATLAS WIRELINE ON ANNA 26 SHORT STRING PRESSURE TEST
LUB TO 500 PSI & 2500 PSI. OK. RIH W/HALLIBURTON PBR & SEAL
BORE EXTENSION. TROUBLES PASSING THRU TREE. WORK
THROUGH. CONT RIH & SET BOTTOM OF PBR @ 7546' (WLM)
BETWEEN TOOL JOINTS.
DAY 2 (04/18/95)
RU CTU ON SHORT STRING. TEST BOP & COIL. RIH W/SEAL &
SHEAR OUT ASSBY ON 1.75" COIL. TAG PACKER @ 7546'. SPACE
OUT COIL & INSTALL HANGER. STAB INTO PACKER. TEST
HANGER. CIRCULATE KCL & SHEAR COILED TBG. ND BOP &
INSTALL VALVES. SHEAR PUMP OUT PLUG. RD CTU.
~OV O o ~5
Alask~ 0il & Gas Cons. Commission
Anchorage
W. G. Smith
District Manager
Amoco Production Company
Post Office Box 100779
Anchorage. Alaska 99510
907-272-8471
September 12, 1986
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Conmdssion
3001 Porcupine Drive
Anchorage, Alaska 99501
File: FEW-224-WF
Dear Sir:
Report of Sundry Well Operations
Granite Point 18742 Well No. 26
Platform Anna~ Cook Inlet, Alaska
Attached in duplicate for your records is a State of Alaska Form 10-404,
Report of Sundry Well Operations, outlining work recently completed on GP
18742 Well No. 26. Questions concerning this report may be directed to
Jeff Blagg at 562-2147.
Very truly yours,
W. G. Smith
District Manager
JCB/dds
Attachments
110/jcb1
,.
RECEIVED
S EP 1 ? 1986
Alaska 0il & Gas Cons. Commission
Anch0ra:e
' STATE OF ALASKA
ALA~'~ .~ OIL AND GAS CONSERVATION COI~.'j SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate I~ Pull tubing
Alter Casing ~ Other [] Cement Squeeze
2. Name of Operator
Amnr_n Prndur_tinn Cnmoanv
3. Address
P.O. Box 100779, Anchoraqe, Alaska 99510
4. Location of well at surface Leg 4, Slot 8, GP P1 at. Anna
771' FNL, 713' FEL, Sec. 12, TiON, R12W. S.M.
At top of productive interval 8216' (7798' TVD) 691' FSL, 2512'
Sec. 1, T10N-R12W, S.M.
10,310' (9,831' TVD) 963' FSL
At
effect2~98~iPtFEL,iWd h Sec. 1, T10N-R12N, S.M.
10,860' (10,377 TVD) 1,014' FSL
At total ~, FEL, Sec. 1-TlON-R12W, S.M.
FEL
5. Datum elevation (DF or KB)
1.05' KB, MSI
6. Unit or Property name
Granite Point 18742
Feet
7. Well number
26
8. Approval number
214
9. APl number
5O-- 733-20297
lO. PO~ddle Kenai "C" Sands
11. Present well condition summary
Total depth: measured
true vertical
Effective depth:
10,860 feet Plugs (measured)
10,377 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
measured 10,310
true vertical 9,831
Length Size
622' 20"
2022' 13 3/8"
8004' 9 5/8"
2608'
Perforation depth: measured
feet Junk (measured)
feet
Cemented Measured depth True Vertical depth
1285 Sx 622' 622'
1600 Sx 2022' 1990'
700 Sx 8004' 7600'
7" 500 Sx 10336' 9857 '
true vertical
See Attached Perforation List
Dual 3{" N-80 at 7638', F single 3{" N-80
Tubing (size, grade and measured depth) Tai 1 pipe at 10060'.
EECEIVEO
Packers and SSSV (type and measured depth)
None
12. Stimulation or cement squeeze summary
8216-8266; 8270-8296; 8307-8340'
Intervals treated (measured)
$ EP 1 7 1986
Alaska 0il & Gas Cons. Commission
Anchorage
vo e e d i es re
Treatrr~[j~~ti~lir~drj~¥s {t~ Ss~~ dc~e~a~[{~i~ pi2 stage block type cement squeeze,
pe; final pressure 2,000 psi.
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
208 117 880 100 70
365 176 503 100 70
14. Attachments
Daily Report of Well Operations [] Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~/1~' ~, "~ ~ - ~''~'
Form 10-404 Rev. 12-1-85
Submit in Duplicate
11. Perforations
CE~m-r CIC-3
~.~..~L)EE'~E~
-4
C-5
C-6
C-7
C-8
Measured Depth
8,216-8,266
8,270-8,296
8,307-8,340
8,469-8,589
8,637-8,660
8,680-8,774
8,975'9,000
9,485-9,530
9,540-9,795
9,880-10,045
True Vertical Depth
7,798-7,845
7,849-7,873
7,883-7,914
8,035-8,148
8,193-8,215
8,234-8,323
8,518-8,542
9,016-9,060
9,070-9,321
9,405-9,568
SEP 1 7 1986
Alaska 0il & Oas Cons, Goi'nmis,~i~n
Anchom[te
AMOC '~; c-q,f;r.,U~-l-iON COMPANY
'DENVEF' RE~E)N .~*.~ ANCH:.JRA6¥ STRiC'F ->*:~.
.,.
CHRONOLO0~ I CAL REPORT
09/08/86 ~.~ PAO. E ~
~.~. ..!O:.'i; ?"J~TIATION REPORT' COM!:'~''' -
.,-,:'~, OPERATED REPAIR '"""'"-'
..... · -. ~.~ :.,,, ~.~ OPPiE NT
.... - ~:.-..-.,...--.:-..,-,,-, r.-. .... . ...... p '-~'"'"' 1. ~'
r'~,' ,':.' .'., ,.:~."-~,.2d' ? ,.' :..-",~' :''.-~.: .. ;
",~P,l".i'.i'.2'FE PE;ri'jT, ,-'.:',..~',-.r~.: .,.T · .--, r.- STATE
.... ...,.r-..A¢4.~ ~_ POT .... 1874~., ~,.',="", KEt',AI-" 0,';,-.
'~ ~ ....... - ~,'~ t.~ ''~ ,"' --. ,.. .
¢F'iEi:k ~-.. ;:..~!:' ¢., ,u......: PROD' ¢'~-
AtlTP.i~... i-,"~'~' 7 ?'f]N-,,.jr,, .... ,..,. ZONE' Oi -- (:;RANiTE.' POINT ~,874.2,~ :It-2&
AU'i'¼ "" '~ '"'~-
.,.,~:_ 06/20/*-36, AUTH COST A. 474000
.-~-~-~. CON'i'RAC TOR < S) i NFORMAT I ON'
PARKER-ANNA, 0150
SEP 1 7 1986
Gas ~ns. Commission
DEr~VEE'
· _ .
REOION *** A:qLHdEAGE
DISTRICT ~. 09/08/86 *~.~ PAQE
ORANiT'E POINT 18742 #26, QRANITE POINT, PARKER-ANNA 1.50, AMOCO PRODUCTION,
~ AC E.~730,_9-01-1 APl 5-73~0~700, ~UTH TD 10860, ~UTH COST
...........
OPSR.AT~E1NS- TD I0860 FT, PBTD 10310, L. OO W/DRESSER PDK-IO0 TOOL
COS'~''''t=:. DALLY WELL s~650,' CUM WELL $1650
........... LL==~ r;iJMP. RIggED UP W. =. .{CAMCO}. PULL S.V. RUN IN HOLE
W/3/4 IN. SINKER BAR. TAg FILL AT 10138 WLM. R IOOED UP
DRESSER ATLAS ELECTRIC LOOQINO UNIT. RUN IN HOLE X TIE IN
OSilqg OAPiMA ~' "
nA~ SONIC ~ OQ DATED lq/~3/76 '
RdN DRESSER POP,-
LO~ F/'~0080 FT TO
~ =u.~.w KT. NOTE: QAMMA RAY INDICATES WATER
BREAK THROUQH 8~50-8350. -
CHiP. liN T):F!E DISTRIBUTION (HRS)'
:s.i rW~ - LOQ, W/DRESSER A~LAS
dO~-) ZNiTZATION REPORT: DIRECTIONAL HOLE
CURRENT WELL ACTZVZTY-AUTHORiZED, DATE 03/1~/85
-:'.'~--~'~ 07/i 9186
QRANITE POINT 18742 #26, ORANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-1, APl 50'73320~9700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OP'ERATIONS: TD 10860 FT, PUbtPINQ
COSTS: DAIL~ WELL $10814, CUM WELL $I~464
,,.:hARKS' NOTE~ POWER OIL WEIQHS 6. 8 PPO.
,~RON TIME DIS"FR!I~UI'iON
8. O0 - LO0~ COMPLETED LONQ STRINO W/DRESSER PDK-iO0 LOO F/10080-8000 FT.
NOTE' WHILE LOOOING ANNULUS FLUID ROSE TO 357.
6. O0 .... Cf'PC, REVERSE DN ANNULUS; UP L.S. X S.S. W/620 BBL P.O..
5. 00 .... OTHER, SHUT IN FOR PRESS BUILD UPi ]'BO X CSO STABLE TO 550 PSI.
!. 50 - OTNEE, BLED PRESS DN X DISP L. 8. X RUN KOBE PUMP 3 X ~--t/8 X
~ ~8. -
.-1 ~ S/N 1~Z342.
'= 50 '- 0 TM "- ~'
~. ~ ri=n, PUMPINg
....
*~* 07/22/86
~RAN l '~- ,~--'
,:= POINT i874~2 #26, QRANi;E POINT, PARKER-ANNA i50, AMOCO PRODUCTION,
FLAC 973019-01-I, AP1 507332029700, AUTH TD 10860° AUTH COST $474000,
AMOCO W. I. 50. 0000
OPERA]'IONS' TD 10860 FT, RIGOING' TO CIRC X KILL WELL.
COSTS' DAILY WELL $8581, CUM WELL $~1045
CHRON 'TIME DISTRIBUTION (HRS)'
"~:.. 50 -- OTHER, CLEAR DECK TO SKID
10. 50 - MI, SKID TO WELL
5. O0 - OTHER, PULL KOBE PUMP; WIRELINE STANDIN~ VALVE; HOOK UP
DENV ER
REOION ~ ANCHC:RA~
DISTRICT *** 09/08/86 ~-** PAOE
SERVICE LI"-'"'NL:::,~ SEI' STAIRS.
07/23/86 ***
,3RANITE POINT 18742 .~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
¢.--A~.:4.-~.~.~.-.~.-~.~.~ ~I.~ ,~ ~.~ ., .
c'l ~r- .-.,~,~r , ~ _~ ~ . ~,, ' . . _
, _~,. '~'..',~o1~-O! , API 507332029700, A}~TH TD 10860, ..vlH COST
AMOCO ',~. i. 50. 0000
..... .m-,~. TD ~0860 FT TEST i:~
OPERA ~ z ~.,,,.o ,
COSTS: DAZLY WELL $14378, CUM W~LL ~35423
, ~.N,= BOP TEST
REMARKS' S'~TE {JOHN L. EVERSON} WA~VERED ~TNESS"
i. 50 -.- RSER, R~ SERVICE AND C~RC L~NES
3. 50 - C~RC, W/8. 4 FN
S. 50 - RU, ELECTRIC L~NE; CUT SS 2-3/8 ~N. ~T 9655 FT
~0. O0 -" NUBOP
5. 50 ..... TSTBOP~ X HYDR~L. HAD TO REPLACE CLAMP IN R~SER P~PE
->*,,~ 07/24/86
r3RANITE POINT 18742 ~26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
****,~-*** ******** *****~*****.~.******************** .~*********************** ****.x-***
FLAC 973019-01-1, API .~nv'%qon29700,. ~ AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PU 3-1/2 IN DP
COSI'S: DAILY WELL $14251, CUM WELL $49674
REMARKS' TOOK 1. 7 BOLS TO FILL HOLE WHEN STARTED TO RIQ TO PULL S.S.
RIO- TO PULL SS AND ¢IRC DOWN HOLE <SS MINOR SCALE}
L/D M, OBE BHA W/2 dTS L.S. {LS SLI(~}HT SCALE; TAILPIPE MINOR
SCALE. BHA = 8-1/2 IN. BIT; BIT SUB; 5 EA 4-3/4 IN. DCS
CHRON TIME DISTRIBUTION (HRS):
i. 'i. Or'~ ....P T~.,
5. O0 -- CIRC,
~' O0 -.. PTG::
i. O0 - PT~,
· ,"-,~"~ ....
~..'-' O0 - PU,
PULL SS/LAY DOWN
DN SL AND UP ANNULUS {QAS}
PULL LS AND STAND BACK
PULL. TAILPIPE AND STAND BACK
'BHA
3-1/2 IN. DRILL PIPE
· ,4, ~,.~.. 07/25/86 **~-
~RANiTE POINT 18742 ~26, ORANI'TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FL. AC 973019-01-1, AP1 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, TOH W/5-.7/8 IN. BIT
COSTS: DAILY WELL $10860, CUM WELL $60584
REMARKS' TIH TO TOP OF LINER AT 7724; NO TIQHT SPOTS W/ 8-1/2 IN]
BIT.
CHRON TIME DISTRIBUTION (HRS):
REg,",_'.:q .*** ANCHORAGE
,.
t
DISTRICT '~'.~'* 09/08/86 -.,'-** PAQE
("
&. 5:.) -. PU,
2. :3C.~ .-- C i RC,
'":' nO -- TRIP,
.:, Or_: - TRIP,
2. 50 -. CIRC,
:3 ~'":~ TR"'-'
Z'. 3C"-.- T R I P,
t:.:. :'.50 .-- T iR iF',
'--i "~ IN.
~ : -~ ~,.~., ILL PIPE
BOTTOMS UP
OUT X L/D 8-1/2 IN. BIT X SUB
IN W/6-1/8 iN. BI]' X 7 IN. CS¢ SCRAPER; TIQHT AT 8254.
BOTTOMS UP AT 8252 FT
OUT X L/D BI]' X SCRAPER
IN W/5-7/'8 :.~'N. BIT. TI(~HT AT SAME SPOT <8254}. TRIED
C irc THROUQH - NO ~0.
OUT
G'RF~N~'i'E P.'D!NT i874;2 ~2&, CJRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
.,..
F'LAC q~73019-01-1, AP1 507332022~700, AUTH TD 108~0, AUTH COST $4.74000,
A?IC'C,f] ~,!. I. 50. 0000
OPE:RA'T i
.... ,,,....., TD 10860 FT, CIRC X MiX KCL AT 8254
C'r;c'"r~'..,,....... , ... i),z'~ILY WELL $'~ 0938,. CUM WELL $714.72
REP'i,'":'.'~R~.~.S' SWEDQE ASSY = 5-3./!6 IN. TAPER SWEDQE~ 4-3/4 IN. DC,: ,3ARS;
· " / .
[JUMPER SUB; 8 EA. 4-,3. 4 IN DC
CHF:ON 'T.',ZME DISTRIBUTION (HRS>'
O. 50 .... 'TRIP, OUT W/5-7/8 IN. BIT
.... ,,, OTHER, WAlT ON TOOLS
3. 50 ..... TRIP, IN TO 8254 F'T 'W/4-5/8 IN BIT. TAC~QED UP - TIQHT 8254
2. 50 -- r,..,. IRC, C-~=,,." "' OUT
2. 50 - 'f'RIP, OUT
2. 50 - TRIP, P/U 3 EA. 4..--3/4 IN. DC X 4-7'/8 IN. BlT X TIH TO 8254
oL .,.. ~H TLY
i. O0 - OTHER, WASH X RM THRU BAD SPOT AT 8254. DP WAS ,JUMPINg- "'' 'r"',
W/15000 LBS BIT WT. THEN FELL THRU TO o,.-.~77 {KELLY DN}
.'.:.;: '.'-.'~0 -.. (;iRC, BOTTOMS UP/ SLIGHT SCALE
,.)... r.-,.-..,,.~? _ TRIP,. OUT; LOST 1 CONE
i. O0 -- OTFtER P/U SWEDQE A.:.~.m.Y
3. O0 - ]'RIP, IN 'TO 8254; SWEDgE WENT I'HRU W/iSO00 LBS
O. 50 -.. C!RC, X MIX KCL {SLIQHT FLOW}
C-:RANI'TE POINT 18742 ¢¢26, QRANIT'E POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC ~73019-01-1: AP1 507332029700, AUTH TD 10860, AUTH COST .$474000,
~,..."iC}CC': ~,.~. I. 50. 0000
OF."E'RA"['i!3!',;S: TD 10860 FT, TIH .W/5-7/8 IN. BIT
CC]~T,~: DAILY WEI_L $14638, CUM ~ELL $86110
CHROf.4 TiM;E DISTRIBUTION (HRS):
3.00 -- CIRC,
3. O0 -. TRIP,
~. oD -' 'TRIP,
,...,."--' O0 - C IRC,
2. 50 - TRIP,
X MIX KCL
OUT X L/D 5-3/16 IN. CS~ SWEDQE
iN W/5-3/4 IN. CS(~ SWEDQE X WORK THRU TIC:HT SPQT AT 8254
W/20-25000 LBS IN X OUT EXTRA WT.
X MIX KCL - 8. 5 PP(~
OUT X L/D 5-3/4 IN. SWED(~E
uEI,.\. ,=P
.=. ~.'.u.' T R i P,
"" :,-, r IRC,
~. 50 - TRIP,
,JO - TRIP,
RE~iON *** ANCHORAGE
,,
DISTRICT *** 09/08/86 *** PAgE
IN W/6-!/8 IN. CSg SWEDQE; WORE THRU TIGHT SPOT F/8249
TO 8263 W/40000 LBS EXTRA WT.
X CUT DRLg LINE
OUT X L/D 6-i/8 IN. SWEDgE
IN W/5-7/8 IN. BIT. WENT THRU TIGHT SPOT AT 8P54. COULD SEE
EXTRA 4-.5000 LBS AS BUMPER SUB CLOSED THEN OPENED.
[~RANiI'E POINT 18742 ~6, gRANITE POINT, PARI&ER-ANNA 150, AMOCO PRODUCTION,
..~..~...~ ** **** ..~,.~.. *** ~.**** ..~****** ******** **** ******** **** **** ******** ***, ********
........... Ob,mO, AU'FH ~OST $474nA~]
~; ~:" S;"730i 9-01 .... i, APT 50733Z:029700, AUTH TDt ~" ~ . .~
,,~,~0~. [. 50. 0000
OPE. r.~t[ONS' TD 10B60 FT, C]RC N/9. 1 PPg SALT WATER
COSTS' D~LY WELL $1~546, CUM WELL *98656
REIfi~RKS' SENT CRANE CRE~ TO DIL. LON TO LOAD NACL ON BOAT. NELL STARTED
FLON~Ng ~/4 IN. ST~E~; BUILT TO ~ IN. STREAM IN !/~ HR. NOTE:
WHEN ~.-7/B ~N. ~!T NENT PA~T ~5~ FT; BU~PER ~UB CLUED; THEN
OPENED. AN EXTRA 4000 LB~ W~S OVSERVED ON ~'r ~NDiCATOR.
CHRON "F!ME DISTRiBUTiON
3. O0 -. TR~P, P/U D. Pi TAg F~LL AT ~00~4
7. O0 '-. OTHER, NELL FLON[NC~; P/U KELLY X SHUT IN. PRES~ l&O P~I-TVD 7837
9. O0 '- C IRC, X M~X N~CL TO ~. 9 PPg
O. 50 .... OTHER, OBSERVE NELL_
2. O0 - OTHER, SHUT %N NELL_ - ~U[LD P]"FS TO 9. 1 PPQ~ PRESS BUILT TO 50
2. ~0 .... C~RC, X MAiNTaiN e. ~ PP~ [N ~Y~TE~
'..+ *.,'.~' 07/29/86 **.~'
gRANiTE POINT 18742 ~26, gRANITE POINT~ PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-i, AP1 50733;~029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W. !. 50. 0000
OP~]RAT'In o. TD ~
,,N,:~. 10860 F'F, REV rIL. L AT 10112 FT
COSI'S. DALLY WELL $18375, CUM WELL $117031
RE?~ARF, S: WHILE L. D BIT X P/U D--.!/2 IN. MAGNET- PIN ON BOWEN dARS TOOL
dT PARTED. FELL 2-1/2 FT. TO RIg FLOOR. NO ONE HURT.
CHRON TIME DISTRIBUTION (HRS):
i. DO -. CIRC, X MAINTAIN 9. 1 PPg
O. DO ..... OTHER, OBSERVE WELL; TAg FILL AT 1001~; W~SHED AWAY IMMEDIATELY'
TO 10014 FT.
3. O0 - TRIP, OUT- L/D BIT <5-7/8 IN}
1. O0 .... OTHER, PIN PARTED ON TOOL dT
2. 50 -. TRIP,
3. 50 -' ClRC,
3. 50 -. TRIP,
4. O0 '- 'FRIP,
O. 50 - C IRC,
1. O0 - C IRC,
O. 50 - C IRC,
IN W/5-1/2 IN. MAGNET - 9990 FT
X BRINg WT BACK 9. 1 PPg
OUT W/MAgNET; WASH TO 100~7 EASY W/MAgNET. NO CONE RECOVERY
L/D 3 DC; ~ dUNK BASKETS; STRAP IN W/CUT OUT 5;-7/8 iN. BIT
CLEANOUT 1001 4-10089
REV AT 10045
CLEAN OUT TO 10189
: ......ER
RE¢ION **~ ANCl.4ut,~E
,-',-rRIc"' ~** 09/08/86 *** PAGE
Di :.:. ,
"'. 5('3 - L.!RC, REV AT i0!-~:~ {PIT X F'LOW LINE PLU,.-,G.~N¢] -" REV AT lOti2.
*** 07/30/86 ***
~}RAN!'FE POINT 18742 ~26: gRANiTE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
=, ,.~' :-;- ..... ~o1¢-01.--.1 AP1 507332029700, AUTH TD 10860, AUTH COST $474000,
u.~Ou
OPERAT:rONS' 'TO t08SO ET, TOH
COSTS: DAZLY WELL $12530, CUM WELL $129561
CI-~Rn''~, ... ....,~., t '~ ~'i~.: ~.~, r~IB !ON (HRS)'
0 50 -' C ~RC,
5. 50 ..... C I
6. 50 - C fRC,
3. O0 '- TRIP,
'3. ,50 - TRIP,
'"'~ ."',0-- ¢- ! RC ~
'"' ,'"'0 ..... TRIP,
- .
,r.%., ~.,:
REV CIRC AT '10112
REV C IRC X CLEAN 10112 TO 10294
t40LE CLEAN X ~IRC BUILD WT TO 9 3 DUE TO WELL. FLOWING
OUTJ LAY BIT DOWN
iN X P/U BRIDGE PLU¢~ AND TIH; SET PLUG AT 8370
BUILD WT TO 9. 4; WELL FLOWINO~
OUT W/BP SET TOOL
.~. **. 07/31/86 ***
GRAN'~:"FE POINT 1874.2 ¢26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F'L.../'.,..C; 9730 ~ 9-01-1, API 507332029700, AUTH TD 10860, AUTH COST ~474000,
¢~M~,t,O W. i 50 0000
OPERmTI' '0,~=~' TD ~0860 ET, LAY DN ~-1/2 IN. TB(¢
COS~°-,,,. DAILY WELL $15401~ CUM WELL $144962
REMARKS' TRIED TO S~UEEZE BAD CASIN~ AND PERES 8216-8296~ 8307-8340
PUMP !0 I3BL. S CEMENT; A'TTEMPTED TO S~UEEZE 5 BBL5; TOP PRESS
450. CEMENT IN PLACE AT 6' 40 PM X END SOUEEZE AT 8' 20 Pld.
ALSO BAD CASIN~ 8254. FINAL SG PRESSURE 350 PSI.
CHRON T):?!E DISTRi~UTiON (HRS)'
.. i,,J -" TRiP OUT X L./D BAI~.ER BP TOOLS
i. C,O -' PU, 9 .JTS DF 3-'L/2 IN. TUBINQ
'2... =r.,.~,.,, ..-. TmlF', ,, , IN N/R~TS TOOL X SET AT 7784
~. 50 .... OTHER, PNP DN DP THRU PKR TO ~500 PSI~ NO FLOW ~N ANNULUS. PRESSURE.
UP BACKSIDE ANNULUS 2000 PSIi HELD OK. TA~ B PLU~ A'T 8370 -
PULL TAIL. PIPE TO 8345.
4. O0 - CIRC, ~U~LD MT T8 9. 6
4. 50 -- S(~, X CHT CS~ X PERES
3. ='3.,.,. ...... WOC, HOLD PRESS QN CNT S~UEEZE
..... , ,DU,_, PRESS ON DP ~bO PST NHEN STARTED OUT HOLE
~. 50 'TRIP, OliT N/RZTS ~-' ' "'
2. O0 - TRIP, IN N/TUBIN~ -" 79 JT9
~ O0 - TRIP OUT X L/D 79 JTS
CQMPL, RECQMPL, REPAIR QPERATIONS: 07/3~/8~, TYPE-S~UEEZE,
: TOP DEPTH 82~ ET, BQTTQ~ 8340 FT
S(2UEEZE TREATMENT: STA~E I, BATCH ~, CEMENT, API CLASS ~, -
~0, BBLS,
PKR DEPTH 8370 ET, SLURRY DENSITY ~5. 6 PP~,
AV~ DISP RATE 3 BPM,
..
DENVER
· .
REGION -~-.~.~ ANCHORAGE
DISTRICT ~'~ 09/08/86 .~ PA~E
¢'
J~u.E-,'.u. ~:,.DD iTIVES
PR~.~.~UI,E ?.40 PSI
S~UEEZED 5. O0 BBLS, FINAL , ,- ...... ri, _
TYP E--RET ARDER,
LWL, O. 20, ";
TYPE--FILTRATION OR WATER LOSS CONTROL,
HALAD 344, O. 60, %
TYPE-OTi4ER:
¢,,...L, O..-:,~), %
.'"¢f~.ANI'f'E PC'I.!!'4T 18'74..2 ' ~
~*,--....,, CJRANI'T'[-- PO!N'f', PARKER-ANNA 150, AMOCO PRC'..DUCT[ON,
FLAC '973019-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000, -
AMOCO W.I. 50.0000
DPER' '~ -
.-..,.t iONS: TD .,.0860 FT, WOC
COS. T~-" D,.",,llLY ' -"' " ._
..... W~,._,._ $~.5185, rUM k!ELL $160147
REMARKS' TA~ ~P AT 8370. FORMA'TION WOULD NOT HOLD PRESS. t500 BLEED OFF
2/B~qLS WATER.-24 CEMENT - ~. 5 WATER-53. 5 KILL WATER TO DISPL
CENENT
CHRON TiME D'rs"f'RIBUTION
=. O0 - TRIP, OUT X L/D ~-'~/2 IN. TB~
3. 50 - TRIP, IN X TAG CEMENT AT 8254
O. 50 -.. OTHER, TEST CEMENT !000 PSI ON A. NNULUS,~ BLEED 100 PSi PER/MIN
!. O0 - OTI4ER, BUILD 50 Bf2LS TO 9.6
1. 50 -. DRLCMT, TAG CMT 8253~ DRILL TO 8368. FIRM CEMENT
3. O0 - CIRC, CEMENT OUT
O. 50 - OTHER, TEST CMT. PUT I0000 ON ANNULUS. BLEED 250' PSI' PER/M!N
,.=.'"'~' 50 -. TRIP, OUT
,"' ~%) .... TRIP IN P/U 12 ,J'T'S '~- A.j[IL. R/'U TO MzX X PMP
..,... , ,..., 1/2 !t'4 BUTT X [;i'l'TS ''"'" "
CMT
5. O0 - SO, 7-1/4. B,.9,°LS CMT W/ STOP P !N(.} PRESSURE OF 2000 PSI. STAGE CMT IN
PERFORATIONS' 08/01/86, TOP 764-5 FT, BOTTOI4 8370 FT, TYPE-CLOSED
COMPL., RECOMF'L, REPAIR OPERATIONS; 08/'0!/86, T'YPE-SO]UEEZE,
TOP DEPTH 7645 FT, BOT'.rOM 8370 F'T
SC~.UEEZE TREATMENT: STAQE 2, E.~A°f'CH 2, CEMENT, APl CLASS
24, BilLS,
PliR DEPTH 8370 FT, SLURRY DENSITY 15. 6 PP~,
AV~ DISP RA'T'E 2 BPM.;' AVQ DISP PRES 200 PSI,
SQUEEZED 5. O0 BBLS, FINAL PRESSURE 2000 PSI
S~UEEZE ADDITIVES:
TYPE-RETARDER,
LWL, O. 20, %
TYPE-FILTRATION OR WATER' LOSS CONTROL,
HALAD 344, O. 60,
TYPE -OTHER,
KCL, O. 30, %
REGION ~**. ANCHORAGE DISTRICT *~* 09/'08/86 **.4 P,AQE 8
RO=UCT
.~R.~N£.._ r. OINT -.8742 #26, gRANITE POINT, PARKER-ANNA 150, AMOCO P .... ION,
FLAC 973019-01-I, API 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATI '~ ' · .,
~,NS TD 10860 FT DR ILL CEldENT
~"~'~'~,....:. DAIL. Y MUD s10461, CUM MUD $10461, DAI~.~' ' WELL $25836, CUM WELL ~185983
r~-~rit ....TrtiE [,iSTRT~,~ION (HRS)'
. elf, ..- ~,0~, ~CHANQE PUMP ON WELL ~35}
i 50 - C'iRC, SHUT-IN D. P..; PRESS STAR]' 1390 END 1220 PSI; RELEASE
RTTS - FLOWINQ. REV CIRC. 6 BBLS CONTAMINATED FLUID B]"~S UP
4 O0 -.- TR~'~
.,F, OUT X L/D RT'TS
3 50 - OTHER, P/U X STANDBACF, 78 ,)TS 3-t/2 IN. ]'BQ TAILPIPE
,.,'? O0 ...... -- TRIP, IN 1.4/5-7/8 ~IT TAQ~ED CMT AT 7850 SUPPORT ~0000 L~..,.~- BIT WT
2. C.O - CIRC, BT~S UP
O. 50 -- OTHER, PRESS TST CSQ AT 7850; STAR]' 1950 PSI - END 1715 PSI
:;2. 50 -- DRLCMT, F/7850-80'75 FT. FIRM - NO STRINQERS
· ~** 08/03/86 ***
~.}RAI,4i'TE POINT 18742 $$26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F'LAC 973019-01-i, AP1 507332029700, AUTH TD 10860, AUTH COST $474000¢
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, ClRC W/F. I. W.-DISPL 9. 6 FL
C'"'~'"""S: CUM MUD $10461, DAILY WELL $27838, CUM WELL $213~¢:1
CHRON TiME DISTRIBUTION (HRS):
O. 50 - DRLCMT, F/8075-8135. QOOD CMT
i. 50 - CIRC, HOLE CLEAN
O. 50 - OTHER, L/D PIPE. REPLACE F/DERRICK
2. f}O - DRLCMT, F'/8135--8300
2. O0 - CiRC, BTMS UP CLEAN
1..O0 .... OTHER, PRESS TST PERF 1950 PSI. LOST 350 PSI IN 6 MIN. LOST aO0
PSI IN 24 MIN
l. 50 - DRLCIdT, F/8300-8336. WASH 8370
2. 50 -. CIRC, BTMS UP CLEAN
O. 50 -- OTHER, PRESS TST PERF 2000 PSI. LOST 500 PS! iN 9 MIN. LOST 190
PSI IN 21 MIN
3. O0 - TRIP, OUT X L/D BIT
i. O0 - TRIP, IN 7 STANDS 3-1/2 IN. TB~ X L/D
i. O0 - RSER, SLIP X CUT DRL~ LINE
2. 50 -- TRIP, IN W/5-7/8 IN. BIT TO 8370
O. 50 - OTHER, CLEAN SUCTION PIT
3. 50 - C.IRC, REV 9. 6 PPg FLUID W/F. I. W
*** 08/04/86 ***
C.'-RANITE POINT 18742 #26, QRANITE POINT, PARKER-ANNA 150, AMOCO PR8DUCTION,
FLAC 973019=01-1, API 507332029700~ AUTH TD 10860~ AUTH COST $474000,'
AMOCO W.I. 50. 0000
DEN'¢PR REGION *** ANCHORAGE DISTRICT *** 09/08/86 *** PAGE
OP[~T[u,,:S. TD ~G~Gu FT, TF~H W/6 ZN. BZ'T
J ' ~
~. EO - ~TN[R, DB!EE UP BR~[ PLU~ B~70 FT
!. O0 - TR
'-' no C iRC,
--, ~r, TRIP,
,,~. ,.., ~ ---
:2. 5C> - TR!P,
~. 50 -.- TRIP,
2. 50 -- 'FRiP,
O. 50 --. CIRC,
2. 00 ..- C IRC,
~.". 00. - T R ..'~ P,
1. O0 - C IRC,
1. 50 - CIR(:,
!, 50 '- TRIP,
IN SLOW TO !0294 - OK
C LEAN
OUT X L/D 5-7/8 IN. BIT X -JUNKSUB
IN W/6-1/8 IN. BIT TO 82:4. BIT TOO TIGHT AT 8254
OUT X L/D 6--I/8 X P/U 6 iN. BIT
IN TO 9370. 6 iN. BIT SLIPPED THRU SPOT W/15000 LBS FIRST
TIME; 5000 LBS THEREAFTER
X ROTATE ~o~ , .-~
· J; 0-94o9
B'!-MS UP. '-'" "' "'
· ,,mo BUBBLE CIRC UP AFTER ROTATiNO~ TH,S SECTION
OUT 7 STD..q,.., ,,," L/D o, JTS DP
X ROTATE 8464-8780
B TMS UP
OUT W/6 'IN. BIT
*.~'-~' 08/05/86 ***
gRANITE POINT 18742 ~26, ~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-I, APl 507332029'700, AUTH TD 10860, AU'TH COST $474000~
A~n~.n W. i 50 0000
i~ ,...~ ~'..., ~'... . .
OPER.ATIONS: TD 10860 FT, TOH L/D DRILL PIPE
COSTS: CUM MUD $10461, DAILY' WELL $11633, CUM WELL $249688
REMARES' NOTE: BEFORE .FIRING GUNS HOLE DRINKIN~ 4 BB'LS PER/HR
CHRON TIME DISTRIBUTION (HRS)'
2. O0 -. TRIP, OUT L/D BIT
6.. 50 -- TRIP, iN W/PACKER TO Ti~H'T SPOT AT 8254. DID NOT ~0 I'HRU. POH.
LAY DN PACKER
8. 50 .- ']'RIP, IN P/U 260 FT 'T'BG CONVEYED ~UNS; 15 STDS 3. 5 11'4. TBG~ PKR;
DP; RABBITT T'BG X DP. FILl. 15 STDS TBO~ X 62 STDS W/WATER
2. 50 -- RU, RIG UP DRESSER ATLAS X CORRELATE DEPTH FOR PERF CUNS
! 50 - OTHER, FIRE gUNS. APPEARED TO FIRE OK. CK FOR BLOW FOR I HR -NO
BLOW. NC] RETURNS. NO PRESSURE. 17 BBL. S TO FILL HOLE W/PULLED
PACKER LOOSE
1. 50 - CIRC, REVERSE HOLE
1. 50 - TRIP, OUT X L/D DP
PERFORATIONS' 08/05/86~ TOP 9495 FT, BOTTOM 9530 FT, I'YPE-OPEN~
SHOTS/FT. 4, PERF DIAM. O. 520 IN, TOTAL NO. SHOT 140,
GUN-OTHER, SIZE 4. 000 IN, PHASINg 90
F'LUID WATER, DENSITY 8.4 PP~, LEVEL 2300 FT
08/05/86, TOP 9625 FT~ BOTTOM 9755 FT, TYPE-OPEN,
SHOTS/FT. 4, PERF' DIAM. O. 520 IN, TOTAL NO. SHOT 423,
GUN-OTHER, SIZE 4. 000 IN, PHASIN~ 90 DEQ,
FLUID WATER, DENSITY 8. 4 PPg, LEVEL 2300 FT
08/06/86
· . .
DENVER REO~ION ~.~-.~ ANCHORAC..E DISTRICT ~?~* 09/08;'86 ~.~ PAGE 10
,,
gRAr.IiTE PO'~NT 18742 ~26, CRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F:LAC 973019-01-1, API 507332029700, AUTH TD 10860, AUTH COST $474000,
· ~,~, ~. i. 50. 0000
OPERATIONS: TD 10860 FT, P. U 3-1/2 IN. TBQ
COSTS: CUM MUD $10461 DAILY WELL $43702, CUM WELL
REMAFZH, S' RETAINER PLATE ~OL.'T CAME OUT IN SHAET ON COMPOUND. BOLT
RUBBED NEXT PLATE AND BEARINQ. REPLACED. LOADED BOAT WITH
DP AND OTHER ITEMS WHILE WORKINg ON Rig.
CHRON ]'l~!E DISTRIBUTION (HRS)'
!I. O0 -. TRIP, OUT X L/D 3--1/2 IN. DP
i. 50 -. PU, PU 'TUB lNG' X RIH
iO. 50 -
i O0- PU, 'FBg X RZH
gRr]N!TE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC.. 9730!9-01-!, APl 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, RIH W/DUAL 3-1/2
COSTS~ CUM MUD $10461, DAILY WELL $48579, CUM WELL $341.969
REMARKS: HOLE HAS TAKEN A TOTAL OF 493 BBLS OF FLUID SINCE DRILLIN~
~ PL.U~ AS OF 6 Aid. <LAST 24 HRS 6 BPH
CHRON TIME DISTRIBUTION (HRS):
7. O0 - TRIP,
2. 50 -- TRIP,
i O0 - TR !P,
2. 50 - RU,
ii. (.)0 - RTC~,
IN P/Li 3-1/2 IN. TB.~
OUT X STAND 3--1/2 IN. TBG IN DERRICK
IN W/TAIL. PIPE
KOBE 3 IN. CAVITY S/N L-285; DUAL_ SLIPS X EI_EVA]'ORS,'
HYDROTEST
R IH W/DUAL 3--1./2 TBS; BROACH LS. HYDROTEST TO 3900 PSI
-~,'"~'~ 08/08/86 ~- .~-
,:.hAl,~iE.~:~OIN'F 18742 ~¢26, gRANI'I'E POINT, PARKER--ANNA 150, ,-~l'""'""lu,.,O PRODUCT..ON,"F
FL. AC 973019-01-I, API 507332029'700, AUTH TD 10860, AUTH COST $474000,
APiOCO W.I. 50. 0000
OPERATIONS' TD 10860 FT, SKID RI~ FM LE~
COSTS: CUM MUD $10461, DAILY WELL $26937, CUM WELL $368906
:.,',~-~:'t~,~ DROP S'TANDINO, VALVE. CLEAN RZ~; SHAKER PI'TS × MUD PITS. TEST
STANDIN~ VALVE TO 3500 PSI -OK. DROP ~,OBE dET PUMP. CHAN~E
OIL. IN #2 X #3 Rig ENQINES. PUMP ON BTM Al' 2220. WINTERIZE
MUD PUMP~ RIGi MUD LINES X KELLY. RIG DOWN SERVICE LINES.
RAN 2-1/2 JET PUMP W/iOA NOZZLE X THROAT. Rig RELEASED 1200
HRS 8/8/86
CHRO,. ]':[ME DISTRIBUTION (HRS)
2. 50 - RTg, DUAL 3-i/2 IN. BUTT. HYDROTES'¥ BOTH STRINGS 4000 PSI..
BROACH L. S - LAND
DENVER .mEOION, *** ANCHORAQE DISTRI"T.~ *** 09z08/86. . *** PAQE 11
.. ~..'~.' U ..... R i~ DN WORKOVER TOOLS
5. 50 - NDBOP, REINSTALL 5 iN RA~S
3. O0 '-- NU, TREE; TEST 5000 PSI. PULL. BPV
&. '50 - OTHER, DROP VALVES AND PUMP
6. O0 - OTHER, PMP ~/N~TL del' PU~P. SKID RI~ TO CENTER BETWEEN LEgS ~ X 2
C-'R.~-~N;:TE. F'OrN-r. 18742 '~':'.,,-,.,, gRANITr:._ POTNT,. PARKER-ANNA 150, AMOCO PRODUCT'rON,
FL,.~r": 7730.t9--0!-~, AP1 507332029700, AUTH 'rD 1.08&0, AUTH COST $474000,
":,,,"b";,"" ;"] .~ .., . '~ "";
,.~., :, ......... )..-,;. ~. ~.'-' L.:",~;-,O
OPEF:'A'T' ~i i')i'~S' ........... i'D iO~:w'-,O Fl' RE~ ," ,- , ._. ,= u"'; "~ :'.r.-n R I Q
,-',"',OTC'-. ~'].~M MUD $10~'lA1, DA~LY ,.,r:'., ~ $556'7 CUM WELL $374473 -
~..,..,,..._, . ~.~ .........
*'4 I._ I..k. , J
REPt~RF.,~' ~4 HR TEST' 2~ ]30PD.; &l~ BWPD~ NO MCFD X OOR~ 20,59 IgPOPD AT
31.&~ PSI. FLUID LEVEL_ ~&~l PT FROM SURFACE.
,..,~ I '1"'
CHP.!]"! Ti'ME D'i'S]"RIG,J~ !ON .,HRS)'
6.. O0 - MO, MOVE MUD PUMPS X PUMP HOUSE. SKID RiO- BETWEEN LEQS i X 2.
CLEAN TOP DECK X LE~ ROOM
IE'~. OC.' -' OTHER, PUMPIN¢ - TEST'!N~
-.~.~...~.~. 08/10/86 ,~.~--~-
gRANI]"E POINT 18742_ #26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 9730t9-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPEF~A.'I'I ~m"J'~..., ,,_ TD I ~o~.~,..,,..,o~, FT, PUMP I:N~
C'''~''~'ci '' CUM
REMARKS: 2% HR TEST: i7 BOPD~ 5~4 BNPD~ NO HCFD X QOR~ 2059 BPQPD A'T'
3~'79 PSi. FLUID 'L_EVEL 5~42 FT FROM SURFACE.
CHRON Ti'ME DISTRIBgTION (HRS):
2.4. O0 -. O'I'HER, PUMP I N(; -. TES'TIN(~
QRANtTE POINT 18742 ¢26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-I, APl 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W. i 50
OPE,r'?.ATIONS: TD 10860 FT, PUMP!N~
COSTS' CUM MUD $10461, CUM WELL $374473
REMARKS: 24 HR TEST: 11 BOPD; 561 BWPDi 0 MCFD X QOR; 2091 BPOPD AT
3249 PSI. FLUID LEVEL 5736 FT FROM SURFACE.
CHRON TIME DISTRIBUTION (HRS):
24. O0 -' OTHER, PUMPINg - TESTINQ .
~,~ 08/12t86
...
DE:.'.&:E~.? RE£-'! ON -~-~...x- ANCHORAO_,E
DISTRICT ~..~. 09/08/86 ~,.~.~ PAgE
(~RANfTE POINT 1874;) ~26, QRANITE POINl', PARKER-ANNA !50, AMOCO PRODUCTION,
FLAC 973019-01-I, API 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINQ
COSTS: CUM MUD $10461, CUM WELL $374473
REMARF, S: 24 HR AVG TEST: 174 BCIPD; 627 BWPD; 23 MCFD; QOR 159;
BPOPD 1386 AT 3350 PSI. SPM 64~ FLUID LEVEL 7085 FT FROM SURFACE
CHRON TIME DISTRIBUTION (HRS):
3. O0 - OTNER, DOWN FOR PUMP CHANQE
2'L. O0 - OTHER, PU~PIN~ - TESTINQ
08/13/86 ~.~
O, RAN'!T~'-' POINT .1874.-'? ~2-6, O~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
r..::'LAC 973019-0i-1, APl 507332-02-9700, AUTH TD I0860~ AUTH COST $474000,
'*' "~"'~"'f'" W. .
~",,~J", .... ,' I. ~0 0000
OPERATIONS' TD 10860 FT, PUMPIN~
· .F."' -r' ~'"
CO::~,:,: CUId MUD $10461, CUM WEL. L $374473
REMARKS'~4 HR AVO, TEST' 112_ BOPD~ &88 BWPD; 48 MCFD; QOR 413; BPOPD
14-61 AT 3402- PSI; SPM 50; FLUID LEVEL 7053 FT FROM SURFACE.
CHRON TIME DISTRIBUTION (HRS)'
,:~ ..... ~:..; -" OTHER, PUMPINg - TESTINQ
gRAN.'(.TE POINT 18742 ~26, ~RANI'TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FL. AC 973019-01-1, APl 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINO~
COSTS: CUM MUD $10461, CUM WELL $374473
REMAR. F,S: 24 HR AVO~ TEST: !65 BOPD; 662 BWPD~ 66 MCFD; (;OR 400~ BPOPD
2569 Al- 3397 PSI; SPM 63; FLUID LEVEL 6847 FT FROM SURFACE.
CHRON TIME DISTRIBUTION (HRS):
24.00 -.. OTHER, PUMPIN<D - TESTIN(~
O. RANiTE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F'LAC 973019-01-1, API 507332029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.i. 50. 0000
OPERATIONS' TD 10860 FT, PUMPINg .
.... ,.,-,. ...UM MUD $10461, CUM WELL $374473
REMARKS:24 HR AVQ TEST: 191 BOPD; 718 BWPD; 84 MCFD; QOR.449; BPOPD
1615 AT 3402 PSI; SPM 63; FLUID LEVEL 6657 FT FROM SURFACE.
DENVER
· .
REQ!ON ~ ANCHORAGE DISTRICT ~ 09/08/86 .~.~ PAP~E
24 HR Avg TEST- 191 BOF'D~ 718 BWPD~ 84 MCFD~ gOR 449; BPOPD
16~5 AT 3402 PSI; SPM 63; FLUID LEVEL 6657 FT FROM SURFACE.
CHRON TIME DISTRIBUTION (HR-S):
24. O0 - OTHER, PUMPINC - TESTINC
24.00 - OTHER, PUMPINg- TESTINg
13
~-'.~+~,'.'... 08/16/86 -.~.~
gRAN£TE POINT i874'-? t~26, O~RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-1, AP1 50'733~029700, AUTH TD 10860, AUTH COST $474000,
P,~OdO W.l. 50. 0000
(]PER. A]'!Oi'~S: TD 10860 FT, PUMPINg
COSTS: CUM MUD $10461, CUM WELL $374473 -
REMARKS: ~4 HR AVQ TEST: 790 MCFDi QOR 55~; 8F 848 AT 77 PER CENT
BS X Wi ~]'Y 40. 8; MCF I06~
CHRON TIME DISTRIBUTION
~.4. (}0 - OTHER, PUlqPINg - TESTINg
· .~.-~ 08/17/86 .~--~
GRANITE POINT 1874;_~ t~26, GRANITE POINT, PARKER-ANNA 150~ AMOCO PRODUCTION,
F'LAC 973019-01-1, AP1 507332029'700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINg
COSTS: CUM MUD $10461, CUM WELt_ $374473
RE,~AR~;,S: 2_4 HR, AVQ TEST: BF 803; QTY 41. 0 AT 60~ BS X W 75 PER CENT
MCF 114; QO~ 590; BPOPD 1685 AT 3368 PSIi SPM 64; FL 6657
ENQ E~F 83 PER CENT; PUMP EFF 58 PE[4 CENTi
CHRON TIME DISTRIBUTION (HRS):
2).4. O0 - OTHER, PUMF'INg - ]'ESTINQ
.;+-~t.-~.,.. 08/18/86
GRANITE POINT 18742 ~26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC ~'73019-01-1, AP1 507332029'700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPING )
COSTS: CUM MUD $!0461, CUM WELL $374473
REMARK~S: 24 HR AVQ TEST: BF 809; BS X W 73 PER CENT; MCF 124; QOR 579;
BPOPD 1676 AT 3368 PSI; SPM 64~ FL 6655
CHRON TIME DISTRIBUTION (HRS):
2.4. O0 '- OTHER, PUMPING - TESTINg
-~ ~.~ 08/19/86
DISTRICT .~'."'~. 09/08/86 ~..~-~ PAgE
1 4
gRAs,J['r~:: F.'C'.,N'~ .-8~4~ ~---6, gRANITE POINT: PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-1, API 5073320~9700, AUTH TD 10860, AUTH COST $474000,
.AP1CDCO W.I. 50.
· --.r~AFIONS TD 10860 FT, PUMPINg
COS]'FS' CUM ,~UD $10461, CUM WELL $374473
RE?..AR!<,S-.24 HR AVQ TEST' gF 8!6; BS X W 70 PER CENT; WATER RECT
· ']~OR 4'75; BPOPD 1.583 .AT 3400 PSI~ SPM 64~ FL 656!
CHF~ n..,,.~ 'F "K~E D ~ '~'"'-' ! HR ~; -
.... ,_u, .~ BUT iON ( ..,j.
'_'; ~L O0 -.- 0 THER, p~ ~.',p T ' ' · ,-o T
-- · ,.:.- _Nt; -- 1-~:.:~
C~RAI',ilTE F'OINT 1874~ :~6, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION, -
F't_.AC V-730~9-01-!, API 507332029'7"00, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OP~=RA'Ti'-'I'~'~'',., ,~. TD 10860 FT, PUMP~N~
~:~'~'''''' CUM MUD $10461, CUM WELL $374473
,:~,~-:.~.,~, 24 HR AV~ TEST' BF 835J AT 60 PER CEN'T WATER RECT 127;
~OR 498~ BPOPD i69! AT 3410 PSI; SP~ &6; FL ~5~2
HR m,
C,4 T'rME DISTRIBUTION
· 24.00 -. OTHER, PUMPIN~ - TESTINg
· ~' '~"~,~' 08/21/86
~'RANJi'FE POINT 18742 ~¢26, (~RAN!TE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F"L.~'&C 973019-0t-!, APl 507332]02.9700, AUTH TD 10860, AUTH COST $474000,
Al'lC)CO W.I. 50. 0000
OPERATIONS: TD ~0860 FT, PUMPIN~
COc~TS'', ~.. .. CUM MUD $10461, r'UM~ WELL.. $374473
REMARKS: 24 HR AVQ TEST; BF 843~ AT 60 PER CENT WATER NET OIL
- NET !39; QOR 509; SP'M 64; FL 6530
CHF:ON TihIE DiSTRiBUTION (HRS):
'-~'" C,¢~- OTHER, PUMPINg TESTINg
-:~'~'-~: 08/22/86 ~.~-*
gRANITE F'O!NT 18742 ~26, gRANITE POINT, PARKER-.ANNA I50, AMOCO PRODUCTION,
FLAC 973019-01-1, AP1 50733.2029700, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINg
COSTS: CUM MUD $10461, CUM WELL $374473
REMARKS: 24 HR AVC- TEST: BF 840; AT 60 PER CENT WATER; o
- MCF 145; QOR 521; SPM 65; FL 6530; BYOPD 1701 A'I' 3378
24 HR AVQ TEST: BOPD 286; BWPD 554; MCFD 145; QOR 507; 8POPD
1701 AT 3378 PSI; SPM 65; FLUID LEVEL &530 FT FROM SURFACE
DENVER REGION **._* ANCHORAGE
CHRON TiME DISTRIBUTION (HRS):
24. O0 - OTHER, PUMPINg - TESTINg
2.4. 00 - OTHER, PUMPIN~ - TESTIN~
DISTRICT **'* 09/08/86 *** PAGE
i5
· ~.:- ~ -~ 08123/86 -~**
C4RF~?.;!'T~/{ POINT 18742 ~8, GRANITE POINT, PARKER-ANNA i50, AMOCO PRODUCTION,
FLAC 973019-01-i, API 5073320~9700, AUTH TD 10860, AUTH COST ~474000,
AIiOC0 W. I. 50. OO00
.. ~r,:,~, Ib.~:. TD 10860 FT, PUMPING
"
...... ~'TS~ CUM MUD $10461 CUM WE~.~. $3~4473
RE?~AR~/,S' ~4 H~ AVQ TEST- BO~D 2~5~ BWPD 5~9; MCFO 146; ~OE 530~ ~PO~D
1677 AT 33~ ~I;
FT F~OM ~URFACE
CHRON TIME OlSTRIBUTION
2.4 ~"~
. w,~ - OTHER, PUMPINg - TESI'IN~
08/24/86
gRANITE POINT 18742 ~26, gRANITE POINT, PARKER-ANNA 150~ AMOCO PRODUCTION,
FLAC 973019-01-1, AP1 507332029700, AUTH TD 108,50, AUI'H COST $474000,
A~OCC) W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINC-'
COSTS: CUM MUD $10461, CUM WELL $374473
REMARKS: 24 HR AVQ TEST: BOPD 296; BWPD 549; MC.F'D t46~ QOR 493; BPOPD
1733 AT 3411 PSI~ SPM 67.; GRAVITY 41. 3 AT 60 DEG; FLUID LEVEL
6498 FT FROM SURFACE
CHRON t'tME DISTRIBUTION (FIRS>:
24.00 - OTHER., PUMPINf~ - 'TESTINg
C~RANI'f'E PGINT 1874,o #26, GRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION~
FLAC 973019-01-I, API 507332029700~ AU'¥H TD 10860, AUTH COST $474000,
AMOCO W. I. 50. 0000
O~ E~AT~.ONS' TD 10860 FT, PUMPING
COS'"~' ' '
~ CUM MUD $10461, CUM WELL. $374473
REMARW, S' D4 HR AVG TEST' BOPD 278; BWPD 564~ MCFD 141; QOR 509; BPOPD
1719 AT 3397 PSI; SPM 66~ GRAVITY 41. 8 AT 60 DEG; FLUID LEVEL
6467 FT FROM SURFACE
CHRON I'IME DISTRIBUTION (HRS)'
~4. O0 - OTHER, PUMPING - TESTING
~m~.* 08/26/86 ***
nP-NL:Ef::. REGION *** ~,..,:~,...,,.-:.~..-,,..-. n'rSTR'i'C''r ~*.~. 09/08/86 *~.~. PAC~E
' ~R.aN'.".?E.,.- .,.., ... ,,,'"' "-' "": ' T. 18742 ~26, ORANIT~:,.. POINT., PARKER-ANNA 150, AMOCO PRODUCTiC'N,
'-' .... . , ~3~0.---9,,00, AUTH TD 10860, AUTH COST $474000,
:-{...,-,,_ '-";.'73019-01-1 APl 50'7'-" "'"' ,'"" -"'
A~,,'-::'"n W. I 50 0000
O~-F~'A'~'I~'''~''~', _.. . ,,~,,.~ TO. 10860 FT, PUMPiN~
¢,nc;Tc:. ~" ' MUD ' '
......... , ,~.,_..,M $i046I, CUM NE,._; $374473
.... '"".':"h .~ ' ,...,,=4..: MCF'D 151.; gOR 506.; BPOPD
;.,~,~¢4,~,:..;' 24 HR AVC-' TEST BOPD 300; B~PD ='"'
~'722 AT 2385 PSZ' '"'"" '~.:-TY FL{...,.'
. , ~:~,.A,. ~ 41. 3 AT 60 DE¢~ ID LEVEL. 6403 FT
FROM SURFACE; SPM 66
..'-' :--,~-? c', N~. ,,, T!.M~. _ .~n ISTR ~ BUT ION.- (HRS) ·
_'::'4.. O0 - OTHER, PUMPINO- - T~.-c'-, ~_,:~ ] INO-.
~}RANI"TE POINT 1874-'?-- ~26., gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-1, AP1 507332029700, AUTH TD 10860, AUTH COST $474000,
,"'~ffiOCO W. ~. 50. 0000
OPERATIONS: TD 10860 FT, PUMPINg
COS'rS: CUM MUD $10461, CUM WEL. L $374473
Ci4RON TIME DISTRIBUTION (HRS):
24 O0 -OTHER, PUMPINg- NO QUA(~E
~.-~ 08/2_28/86 .~.~
O~RANITE POINT 18742 ~26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
Fi_AC 973019-01-1, AP1 507332?.02-29700, AU]'H TD 10860, AUTH COST $47'4000,
.A!"~OC.Q W.I. 50. 0000
OPERATIONS' TD 10860 FT, PUMPIN(~
COSTS: CUM MUD $10461, CUM WELL $374473
REMARKS: 24 HR AVQ TEST: 308 BOPD; 548 BWPD~ gRAVITY 41. I~ MCF 152.~
(~OR 494; BPOPD 1719 AT 3362 PSI; SPM 66; FLUID LEVEL 6470 FT
FROM SURFACE.
C~-~.Ri3p,i ]"].ME DISTRIBUTION (HRS):
24.00 - OTHER, PUMPINQ - TESTINg
4.'.*-~- 08/29/86 ***
O~RANi'TE POINT 18742 #26, QRANITE POINT, PARKER--ANNA 150, AMOCO PRODUCTION,
F'LAC 973019-01-1, AP1 507332029-/00, AUTH TD 10860, AUTH COST $474000,
AMOCO W.I. 50. 0000
OPERATIONS: TD 10860 FTo PUMPIN(~
COSTS' C'UM MUD $10461, CUM WELL $374473
REMARKS: 24 HR AVO~ TEST: 326 BOPD; 532 BWPD; QRAVITY 41. t; MCF 160;
O~OR 491; BPOPD 1710 AT 3346 PSI; SPM 66; FLUID LEVEL 6343 F-T
FR OM SURFACE.
CHRON TIME DISTRIBUTION (HRS)~
DENVER P EC4i ON **'*
(
'"" 0{.'.. -. OTHER PUMP i N¢~ - '""='-'
o,:... ~: , i u..: T' lng
DISTRICT *,~* 09/08/86 **-~' PAgE
..
(
!7
*.~ 08/30!@& ***'
.... "',.... ,.,._..4; 18742 ~.26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
:.,R,-,;..~ fT~' p"'"."~' '"'
F!._AC '-.-' ;b;Ul"'-~-,..,'-'l-i, APi .... ,.,,¢-'""/,.,o,:.:,,,'"'~2'-.~700, AUTH TD i0860, AdTH COST s474000,
:-,.: ,~...,,:.~ ~,4. 'r 50. 0000
O{..-"E'RAT.~3..'4S: TD i0860 FT, PUMPi~'4¢2,
COSTS: C',...M MUD $10461, CUM WELL. $3744'73
~r::: ...... ; .._.....-_ ,.. ,..=TRfB,...TION ( S)
~" &=. m .... (;,",' -. OTHER : PUMPTNO,- ..- ~4C'. ~d.,-,C-E
-'.<- -.'~.-.'~ 08/31/86
~R,~NITE Pf]!.NT 18'742 #26, QRANITE POINT, PARKER--ANNA 150, AMOCO PRODUCTION,
FLAC :'{.'7301e-Ol-i, APl 507332029700° AUTH TD 10860, AUTH COST $474000,
A~iOCO W.I. 50. 0000
OPERATIOi'JS: TD 10860 FT, PUMPI'N(~
COSTS' CUM MUD $10461, CUM WELL $374473
REMARKS'. 24 HR AVQ TEST: 331 B(DPD~ 541 BWPD; O~RAVITY 41. 1; MCF 163;
~30R 492; BPOPD 1793 AT 3404 PSI; SPM 68; FLUID LEVEL 6343 FT
FROM SURFACE.
CHR[..IN TiME DISTRIBUTION (HRS):
24. O0 -' OTHER, PUMPINQ - TES'flNQ
¢~RAN[TE POINT 18762 ~26, G'RANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
FLAC 973019-01-1: AP1 5073',320;;~9700, AUTH TD 10860, AUTH COST $474000,
~MOC() W.I. 50. 0000
O?ERAT ~~.,~.~ ~'''''''. Tn~. i0860 FT, PUMP'[
~u~ $i04~1, CUM tWELL
~ .... ~ ..... ~,.,¢ ¢ 4473
CHRON TI~E DISTRIBUTION (HRS):
2~. O0 .... OTHER, PUMPZN~ - NO ~UA~E
-~. ~-*.' -:~. 09/02/86 ,~'-~ ~-
QRANITE POINT 18742 #26, QRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION~
FLAC 973019-01-1, APl 50733,2029700, AUTH TD 10860, AUTH COST $474000,
A~IOCO W.I. 50..0000
OPERATIONS: TD 10860 FT, PUIdP!N~ .
COSTS: CUM MUD $10461, CUM WELL ,$374473
REMARKS: 24 HR AVQ TEST: 332 BOPD~ 498 BWPD; QRAVITY 41. 1; MCF 159;
QOR 479; BPOPD 1-/~1 AT 3370 PSI; SPM &8¢ FLUID LEVEL 6400 FT
DE?.-'VE'i'.',~ RE(~ION .*** ANCHORAGE
FROM SURFACE.
CHROi~ T..',...'-iE DISTRIBUTION (HRS):
.'::'4. O0 - OTHER, PUMPINO- TESTINg
D~.~STRICT -~*~ 09.;08/86 ~'.".,-~ PAgE
09103/86 ***
ORA.~-i"'i"E F'C'!NT 18742 ~26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCT,iON,
~-'; '.," - .,uoou, AU COST $474000,
, .., ....973019-0I I, API 507332029700, AUTH TD ~" ..... TH
Ar'iOCG W.i. 50. 0000
O~'.,.'..;[F~,,!.TIO'?,S: '[D 10960 F'T,
,-,-,c t.!.UD 04
,.,,.~...T~'-;: Ct.q'1 $I 6i, CUM WELL $374473
(.;'?~f4Fi?4 T ~'.".'!E DISTR I. BUTiON
,.-;4. O0 -. OTHER, P' ~MPINg,., -. NO ~'"t..,,~.,~E
· ,~ **. 09/04/86
gRAf, ilTE POINT 18742 %26, gRANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
.** ~ ~,-.~* .~...~... ~. ** **~. ~*** ..***..~. **** **¢,. **** ~. * *** * **:~. * **~* ~** **** **** ***.* * *.* *
FLAC 973019-01-1, API 507332029'700, AUTH TD 10860, AUTH COST $474000,
A!'IDCO W.I. 50. 0000
OPERATIONS: TD 10860 FT, PUMPIN~
COSTS.' C,'JM MUD .m10461, CUM WELL $374473
C.HR!.')!'.~ T l~'iE DISTRIBUTION
24.00 -OTHER, PUMPINg- NO QUAgE
09/05/86
gRAIq].TE POINT 18742 ~26, ORANITE POINT, PARKER-ANNA 150, AMOCO PRODUCTION,
F'LAC 973019-0!-1, APl 507332029700, AUTH TD I0860, AUTH COST $4.74000,
~,~OC,., I. 50 0000
OPERA'TZO¢',~S: TD 10860 F'T', PUMPINg
COSTS: CUM MUD $10461, CUM WELL $374473
r.~,,.,,S =-. HR AVQ TEST BOP'D 365; BWPD 503~ gRAVITY 41. 3; MCF 176;
OCR 482; BPOPD 1824 AT 3365 PSI; SPM 69~ FLUID LEVEL 6340 FT
FROM SURFACE
CHRO{'.4 TI~'!E D!STRIBUTION (HRS)'
24. O0 - OTHER, PUMP!NO - TESTINg
1 7 1986
Alaska 0il & Gas Cons.
Anchora.~e
W. G. Smith
District Manager
Amoco Production Company
Post Office Box 100779
Anchorage. Alaska 99510
907-272-8471
June 23, 1986
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
File: FEW-160-WF
Dear Sir:
Notice of Intent
Granite Point 18742 Well No. 26
Platform Annas Cook Inlets Alaska
Attached in triplicate for your approval is a State of Alaska Form 10-403,
Sundry Notices and Reports on Wells, to notify you of our intent to
workover Granite Point 18742 Well No. 26 in order to isolate and squeeze
off water production.
This well experienced a water influx on June 13, 1986, and production is
Currently off 500 BOPD. The proposed workover will investigate the casing
integrity, check .perforations for communication and squeeze to provide
isolation and shut off water production. The well will then be
reperforated and returned to production.
We plan to begin this work. as soon as possible. A BOP sketch, and present
wellbore diagram are attached. Sufficient notice will be given so that a
representative from your office may witness the BOP testing. Any
questions concerning this project may be directed to Kurt Unger in our
Anchorage office.
Very truly yours,
W. G. Smith
District Manager
KWU/dds
' ,cCEIVED
J u N 2 6 1986
Attachments
080/rots i
~misslo~
STATE OF ALASKA
ALASI~" ..)IL AND GAS CONSERVATION COM~i ~ION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [~ Change approved program [] Plugging [] Stimulate ,~ Pull tubing [] Amend order [] Perforate [] Other,~
2. Name of Operator
Amoco Production ComDanv
3. Address
P.O. Box 100779~ Anchoraqe~ Alaska 99510
4. Location of well at surface Leg 4, Slot 8, GP Plat. Anna
771' FNL, 713' FEL, Sec. 12 TION, R12W. S.M.
At top of productive interva~ 2½.6~4.(7 798 TVD) 691' FSL 2 512' FEI
Sec. I TION, R12N: ' ' '
At effective depth 10,310' (9831 TVD) 963' FSL, 2,898' FEL,
Sec 1, TION, R12W, S.M.
At totaldepth 10,860' (10,377 TVD) 1,014 FSL, 2,937' FEL,
Sec 1, TION, R12W~ S.M.
11.' Present well condition summary
Total depth: measured 10,860 feet Plugs (measured)
true vertical 10,377 feet
5. Datum elevation (DF or KB)
105' KB. MSL .
6. Unit or Property name
Granite Point 18742
7. Well number
26
8. Permit number
76-77
9. APl number
50-- 733-20297
feet
10..P~lddle Kenai "C" Sands
Effective depth: measured 10,310 feet Junk (measured)
true vertical 9,831 feet
Casing Length Size
Structural 622 20"
Conductor 2022 13 3/8"
Surface 8004 9 5/8"
Intermediate
Production
Liner 2608' 7"
Perforation depth: measured
Cemented Measured depth True Vertical depth
1285 sx 622 622
1600 sx 2022 1990
700 sx 8004 7600
500 sx 10336 9857
See attached Perforation List
true vertical
Tubing (size, grade and measured dept~ual 3~}" N-80 at 7,636', F single 3{" N-80 tailpipe
at 10041'
Packers and SSSV (type and measured depth) None
12.Attachments Description summary of proposal J~ De_t.ail_ed,,,o._~. l'a~ip~s~rogram []
13. Estimated date for commencing operation
June 27, 1986 JUN26
14. If proposal was verbally approved
A~a$~a 0il & Gas Cons. G0mmissi0~
Name of approver Anchorage Date approved
BOP sketch []
15. I hereby certify that t~3~-~fore,~ng is true,nd correct to the best of my knowledge
Signed ~.~/~']~~~~ Title District Manager
Commission Use Only
Date06/23/86
Conditions of approval
Approved by
Notify commission so representati.ve may witness I Approval Nc. re.~
[] Plug integrity [] BOP Test ~ Location clearance l m~j~'
Approved Copy ;<~,;.~ :~..~._ ~
Returned ~ /
by order of
~' ~'~}[~., Commissioner the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
. ,
.~-r~. Amoco Production Company
ENGINEERING CHART
&,,<-4~,,,.,-,,,,--z ,~_.,,,../~-,,~:r'~-,~/z,;,t
SHEET NO.
FILE
OF
/
· HYDRIL /
^N NUL,/IR BOF~J
I .SL', !
' t~ t~ r.'~ TY F E
~OP.
t
CRO%5
I
· .
· -c/P /._///g-
·
·
"TO
~_. cttokE
(,-/ ,,
JUN26 19.8.6
Anchorage
11. Perforations
C-3
Measured Depth
8,216-8,266
8,270-8,296
True Vertical Depth
7,798-7,845
7,849-7,873
C-4 8,307-8,340 7,883- 7,914
C-5 8,469-8,589 8,035-8,148
8,637-8,660 8,193-8,215
8,680-8,774 8,234-8,323
8,975-9,000
C-6
C-7
9,485-9,530
9,540-9,795
8,518-8,542
9,016-9,060
9,070-9,321
C-8 9,880-10,045 9,405- 9,568
12. Description Summary of Proposal
Amoco Production Company plans to perform the following work:
1. Displace well to power oil, shut-in, and determine kill weight
requ i red.
2. Kill well with diesel, emulsified diesel or salt water system
depending on kill weight required.
3. Set back-pressure valves, nipple down tree, nipple up BOP's and test
to 3,000 psi. Pull back-pressure valves.
4. Rig up wireline, cut short string and rig down.
5. Pull tubing and BHA.
6. Clean out with 8½" bit to liner top at 7,728 feet. Clean out with
6-inch bit to TD.
7. If no casing restrictions are encountered, trip in hole with packer
and check liner top, C3, C4, and C5 perforations for communication.
8. Set retrievable bridge plug above lowest perforations which are
isolated.
9. Based on results of (7)above, squeeze will be
the C3, C4, and C5 zones.
,,
10. Reperforate C5. JUN26
11.
12.
13.
Retrieve retrievable bridge plug.
Run tubing and new BHA.
Return well to production.
Grani
te Poin) '8742 Well No.
Wellbore DJ'ab, am
26
'4
Casinq Record Depth
20", 74# CSA 622'
13-3/8", 54.5# CSA (12.615 ID) 2022'
9-5/8", 43.5 & 40# CSA(8.755-8.835~ 8004'
7" Liner 26#(6.276 ID) 7728-10,336'
Completi on Record
l) 3½" Buttress, 2-7/8" EUE 8RD
X-over
2) 2-3/8" EUE 8RD Pup Joint
3) 3½" Buttress x 3½" 8RD X-over
4) 3" Kobe Type 'Bt Cavity-single
Depth
5) 3½" 8RD x 3½" Buttress X-over
....
6) Muleshoe
Io0¥/
'Perforations
~ -j 8216-8266' 8680-8744 '
8270-.8296: ~ ~ 89 75-9000 '
~-~(/ 8307-8340' ~-7 9485-9530'
C-.5' 8469-8589' 9540-9795'
8637-8660' ~ -2~ 9880-10,045'
W. G. Smith
District Manager
April 18, 1985
Amoco Production Company
Post Office Box 100779
Anchorage. Alaska 99510
907-272-8471
File: TJZ-124-WF
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
· 3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Subsequent Notice
Granite Point 18742 Well No. 26
Pla~tf..orm Anna, .Cook Inlets Alaska
Attached in duplicate is a State of Alaska Form 10-403, Sundry Notices and
Reports on Wells, subsequent to pulling tubing, cleaning out fill, and
reperforating the C-8 zone in Granite Point 18742 Well No. 26. The.well
was returned to production and is currently producing 935 BOPD, 68 BWPD,
and 368 MCFD of gas.
Any questions concerning this project may be directed to Mike Schwein in
our Anchorage office.
Very truly yours,
W. G. Smith
District Manager
Attachment
MTS/dds
RECEIVED
APR,[ 9 985
Alaska 0ii & Gas Cons. Commissior~
Anchorage
{' STATE OF ALASKA '{'
ALASKA OIL AND GAS CONSERVATION CO~vlMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL 1~ OTHER []
2. Name of_Operator 7. Permit No.
Amoco Production Company 76-77
3. Address 8. APl Number
P. O. Box 100779, Anchorage, Alaska 99510 50- 733-20297
4. Location of Well
Leg 4, Slot 8, Granite Point Platform Anna
771' FNL, 713' FEL, Sec. 12, TiON, R12W, S.M.
5. Elevation in feet (indicate KB, DF, etc.)
105' KB, MSL
I 6
. Lease Designation and Serial No.
ADL 18742
12.
9. Unit or Lease Name
Granite Point 18742
10. Well Number
26
11. Field and Pool
Granite Point Fie]d
Middle Kenai "C" Sands
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [~ Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Amoco Production Company performed the following work: 1. Circulated and killed well with diesel.
2. Set back-pressure valves, nippled down tree, nippled up BOP's and
tested to 2,500 psi. Pulled back-pressure valves.
3. Rigged up wireline, cut short string, and rigged down.
4. Pulled tubing and bottomhole assembly.
5. Cleaned out fill.
6. Reperforated the C-8 zone from 9,888 to 10,045 feet with tub-
ing-conveyed perforating guns fired underbalanced.
7.'" Ran tubing and new bottomhole assembly. Bottomhole assembly set at
7,636 feet and tailpipe set at 10,041 feet.
8. Set back-pressure valves, nippled down BOP's, nippled up tree and
tested to 4,000 psi. Pulled back-pressure valves.
9. Returned well to production. RECEIVED
APR 1 9 ]985
Alaska 0il & Gas Cons. Commission
Anchorage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~.~. ~'~ /~.~J.- Title District Manager
The space below for Commission use
Date 04/18/85
Conditions of Approval, if any:
By Order of
Approved by. COMMISSIONER the Commission
Date
Form 10403
Rev. 7-1 ~80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
(AMOCO)
W. G. Smith
District Manager
March 20, 1985
Amoco Production Company
Post Office Box 100779
Anchorage. Alaska 99510
907-272-8471
File' TJZ-O94-WF
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Notice of Intent
Granite Point 18742 Well No. 26
Platform Anna, Cook Inlet, Alaska
Attached in triplicate'for your approval is a State of Alaska Form 10-403,
Sundry Notices and Reports on Wells, to notify you of our intent to pull
tubing, clean out fill covering the C-8 perforations, reperforate the C-8
zone, and return Granite Point 18742 Well No. 26 to production.
Production has recently dropped by approximately 280 BOPD and the fluid
level has also dropped approximately 1,000 feet. Fill was tagged on
March 6, 1985, at.i.9,931 feet and therefore, 114 feet of perforations are
covered with fill.
We plan to begin this work as soon as possible. Any questions concerning
this project may be directed to Mike Schwein in our Anchorage office.
Very truly yours,
W. G. Smith
District Manager
Attachment
MTS/dds
"t STATE OF ALASKA
ALASKA ILAND GAS CONSERVATION C ,vlMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~:: OTHER []
2. Name of Operator 7. Permit No.
Amoco Production Company 76-77
3. Address 8. APl Number
P. 0. Box 100779, Anchorage, Alaska 99510 50- 733-20297
4. Location of Well
Leg 4, Slot 8, Granite Point Platform Anna
771' FNL, 713' FEL, Sec. 12, TION, R12W, S.M.
5. Elevation in feet (indicate KB, DF, etc.)
105' KB, MSL
12.
I 6.
Lease Designation and Serial No.
ADL 18742
9. Unit or Lease Name
Granite Point 18742
10. Well Number
26
11. Field and Pool
Granite Point Field
Middle Kenai "C" Sands
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate ~i~ Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing ,~ Other ~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Amoco Production Company plans to perform the following work: 1. Circulate and kill well with diesel based fluid.
2. Rig up wireline, cut short string, and rig down.
3. Set back-pressure valves, nipple down tree, nipple up BOP's and
test to 2,500 psi. Pull back-pressure valves.
4. Pull tubing and bottomhole assembly.
5. Clean out fill.
6. Reperforate the C-8 zone with tubing-conveyed perforating guns
fired underbalanced.
7. Run tubing and new bottomhole assembly.
8. Set back-pressUre valves, nipple down BOP's nipple up tree and test
to 4,000 psi. Pull back-pressure valves.
9. Circulate well with power oil and return to production.
REC£1VED
Alaska Oi~ & Gas Cons. Commission
^nchorage
14. I hereby~fy tha~oing is~me~and corre~Z
Signed (_~~.'-... '~
The space below for Commission use
to the best of my knowledge.
Title District Manager
Conditions of Approval, if any: Approved Cop,/
ti kOilll C. SMITH ~v Order of
Approved by. COMMISSIONER the Commission
Date 03/20/85
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
L. A. Darsow
District Superintendent
Amoco Production Company
Post Office Box 100779
Anchorage, Alaska 99510
907-272-8471
December 30, 1983
File: WEN-122-WF
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir-
Granite Point 18742 Well No. 26
Platform Anna, Cook Inlet, Alaska
Attached in duplicate is State of Alaska Form 10-403, Sundry Notices and
Reports on Wells, informing you of the work recently completed on Well
No. 26.
Very truly yours,
W. E. Nielsen
Supervisor in Charge
Attachments
LMA/seh
..:",~ :>,, ¢ .:?' .,.: ii[:' ~;~.;'
· ,,-~ ;:.,~ ·
% -,'
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION ~,~MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL I-I
COMPLETED WELL []
OTHER
2. Name of Operator
Amoco Production Compan.y
3. Address
P. O. Box 100779, Anchorage, Alaska
4. Location of Well
99510
7. Permit No.
76-77
8. APl Number
so- 733-20297
Leg 4, Slot 8, Granite Point Platform Anna
771' FNL, 713' FEL, Sec 12, TION, R12W, S.M.
[]
[]
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
-- !05' KB-MSL I A_nL ~_8742
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
9. Unit or Lease Name
Granite Point 18742
10. Well Number
26
11. Field and Pool
Granite Point Field
Middle Kenai Sands
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate I'-I Abandon [] Stimulation [] Abandonment
Rel3air Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing {~
(.Note: Report multiple, completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state ail pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Amoco performed the following work on Well No. 26 in December 1983.
le
Se
e
e
Circulate and kill well with diesel based fluid.
Set back-pressure valves, nipple down tree, nipple up BOP test to.
2,500 psi. Pull back-pressure valves.
Rig up wireline and test lubricator to 2,500 psi. Cut short string
and rig down.
Pull tubing and bottomhole assembly.
Run tubing and, new bottomhole assembly.
Set back-pressure valves, nipple down BOP, nipple up tree and test
to 4,000 psi. Pull back-pressure valves.
Circulate well with power oil and return to production.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signori LO-~, ~'~ ..~..,~ /,~,,,~,.~..~ Title Supervisor in,Charge
The space below for Commission use ' I
Conditions of Approval, if any:
By Order of
ApproVed by. COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate.
and '"Subsequent Reports" in Duplicate
L. A. Darsow
District Superintendent
Amoco Production Company
Post Office Box 100779
Anchorage, Alaska 99510
907-272-8471
November 4, 1983
Fi 1 e' LAD-1066-WF
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Granite Point 18742 Well No. 26
Platform Anna, Cook Inlet, Alaska
Attached in triplicate is State of Alaska Form 10-403, Sundry Notices
and Reports on Wells, informing you of the work planned for Well No. 26.
The worn bottomhole assembly is unable to optimally lift the well. We
plan to pull and replace the bottomhole assembly.
Any questions may be directed to Lynn Aleshire in our Anchorage office.
Very truly yours,
L. A. Darsow
District Superintendent
Attachments
LMA/seh
"t ,';., .~1',.,,.f~
,~-~t~..,::~a, 0ii ;'.Z.. Gasuuns,. £;om~issi0.r~
Anchorage
'.'' ' ~" STATE OF ALASKA ~
'..'"' '"' ALA.SK,-, MiL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
· .
1. ' ' " DRILLING WELL[]
COMPLETED WELL
OTHER []
2. Name of Operator· ·
Amoco P~o.duction Company
3. Address :
·
P. 0. Box.. 100779, Anchorage, Alaska 99510
4. Location of Well "
Leg 4,. 'S.lOt ~5, Granite Point Platform Anna
· 771.' FNL, 713' Ir. EL, Sec 12,. TION,. R12W, S.M.
....
· . -.
;
..
· .
· . .
· ..
·
7. Permit No.
·
76-77
8. APl Number
50- 733-20297
9. Unit or Lease Name
Granite Point 18742
10. Well Number
26
5. Elevation in feet (indicate KB, DF, eic.) "'. I' 6. ·Lease Designation and.Serial No.
_ 105! KB~MSI"' .' 'I ' ADL 18742 .'
12, ' ' '- .. Check Appropriate'Box To'Indicate matur..e of Notice, .Report, or Other Data
' ' 'NOTICE 0¢ INTiENTI.O.N TO' ..
1 1. Field and Pool
Granite Point Field
Middle Kenai Sands
[]
[]
· .
· · " ' '(Sub'mit in TriPlicate). , '. ' '.' ' :. ...
Perforate"" : .... ' 'El"." .Alter'casing' .. [-1' "Perforations
.
· Stimdl.ate..'." ..... r-J' . Abandon '1-~ '. . S.timulation
. .. .,... , .
Repair WeJ.I .' .'..".[] ..'. Chang~ Plank . "" [] .,-:.: 'Repairs Made
Pull Tubing · ' ..... ' ,~" ':, ' .'.Other ... ' ' "'t~ ' . "' ' Polling Tubing
(Notei R'ep'Qr~ mblt~p"ie cO~ple~ions on' Fo(m 10,~07 with a submitted Form' 10-4~? for each completion.) .
SUBSEQUENT REPORT
(Subr~it in Duplicate)
Iii' Altering Casing
" [] Aba~donm~n~
[] Other
Describe Proposed: or Comp. leted Operatic.ns .{Clea(l~ State ..all Per'{inent de, ails.and give pertinent dates, including estimated date of starting any.
p¢oposed wo~kj for. Abandonment see 201AAC.25..'.10~-170): ' '" .... .. · "' .i
". 'i. Am6c0"'~iian's. i~O,"per'¢'oCm' the".foll'.owing '.wOrE ..on. Nell No. Z6 in November. '.
' 1.983,. : ...
,
.,
· , ,' , .... : ,, ,
.
· , · ,
1.; . ·'Circulate'and kill.well wi:.th d~ese1.based fluid.
.-.'. : 2..." Set. back-'pressur, e.'valves, .nipple.down tree, .nipple up BOP and test
't.o 2,'500 psi..". 'Puli .bac'k.-.'PressUre Valves · '
'3.'.. 'Rig"up'wi.~'el'.i. ne abd'tes't.lubricat'or to 2;500 psi, Cut. short string
and rig dOwn; .....
'4; .. ·.Pull tubing and.' bo'ttomhoie asse.mbly..'
.5.- Run-tubing. and 'new bott.omhote assembly.
6. ..Set .back,pres'sure valves, nipple down BOP, nipple up tree and test
to 4.,000' psi. Pull back-pressure valves.
.7'; CiYcul'ate well With.power oil' and return to production.
· ,
,
14. I hereby certify that the foregoing is true'and correct to the best of my knowledge.
Signed Title Di.+-~ct Supcri.+..~..t Date
~1 i II ~kll~kll
The space below for Commission use
Conditions of Approval, if any:
BY L0t{~,,~ i;. [~'~lTff
Approved by. ~ "~-'--'~'~"
Approved
Returned
_ _//-/?-,,¢3
BV Order of
COMMISSIONER the Commission
Form 1'0-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
Amoco Production Company
P.O. Box 779
Anchorage. Alaska 99510
L. A. Darsow
Area Superintendent
April 27, 1977
File: LAD-349-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Open Hole Logs
Granite'Point 18742 Well No. 26.
Following our letter of April 6, 1977, File: LAD-271-WF, we have
enclosed an original and one copy of the open hole logs for the subject
well for your files.
R EC E IVED
L. A. Darsow
Area Superintendent'
APR 28 1977
Division oi 0ii and Gas C01~servatio~
Anchorage
Enclosures
Amoco ProdUction Company
P.O. Box 779
Anchorage, Alaska 99510
L. A. Darsow
Area Superintendent
April 6, 1977
.?
File: LAD-271-WF
Hr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Completion Report
Granite Point 18742 Well No. 26
Please find enclosed'the Well Completion Report Form P-7, a chronolog-
ical drill!n~ history, the directional survey,..and the lab analysis o'f
cores for the subject well. We have.not received the final open hole '
logs for this well but copies will be transm/tted to your office upon
their receipt.
Very truly yours,
L. A. Darsow
Area Superintendent
Enclosures
- 8 977
4,
SUBMIT IN DVp'.L1CATE'
STATE OF ALASKA ','Se~oth,r
s', ructions on
OIL AND GAS CONSERVATION COMMITTEE
WELk COMPLETION OR RECOMPLETION REPORT ~ND COG*
WELL WELL
EN BACK RESVR.
la. TYPE OF WELL:
h. TYPE OF COMPLETION:
SEW .~ WOng []
,,' ~:,.,. o,' ~.a
NA~-fE OF OPERATOR
Amoco Production Company
Other
50-133-20297
AP1 NUlW_F..RICAL CODE
ADL-18742
6. LEASE DESIGNATION A-ND SERIA~ NO.
~. IF INDIA.N, A.LLO~ OR TRIBE NA/VLE
8. UNIT,FA_R_M OR LEASE NAME
Granite Point State 1874
9. W~L NO.
26
~. ADDRESS OF OPERATOR ~'
~' ?q~ ~'~"? n.,
~,,, ~, ~,, t?.....~ ,~,
P. 0. Bcx 779, Anchorage, AK 99510 c;:'.. 10. F~-~-BA~IDPOOL, ORV~ILDCAT
4. ,.oc,r,o~ o~ w~ (~ ~oo~t~o, a~a~ aba ~ ~,~ ~,~ ~,~ s~te ~m,!~,t]).":"'-.'~r'..-'c:;~. Granite Point
at ~ua~c~ Leg 4, Slot 8, Granite Point Platform An~'~d~'; .... ~" n. ~c.. T.. R.. ~.. ~O~ ~O~
771' FNL, 713' FEL, Sec. 12, T10N, R12W, S.M.
At top prod. interval reported below
691 FSL, 2512 FEL, Sec. 1, T10N, R12W, S.M.
At total dep~
1014 FSL, 2937 FEL, Sec. 1, T10N, R12W, S.M.
13. DA~SP~DDED[14. DATET.D. RF~CHED[lS.',DATECO'MPSUSPORARA/TD. ll6. ELEVA~ONS(DF, RKB,
} l ZO5'
~8. T~AL D~H, ~ & TVD~9. PLUG, ~CK MD & ~D~, ~ ~LT~ ~L., 21.
~, 10,377'TVD [ { ~OW~Y' ROTARY ~00LS
10,860' 10,310'~, 983fT~ ~mngAe 0-TD
=. P~ouuciNo ~VAr~S), Or ~ZS CO~ZOS~, ~O~O~. ~ ~ A~n ~.
8216' MD - 7798'TVD:', 10.,045'MD - 9568'TVD, "C" Unit, Middle Kenai Sand
OBJECTIVE)
Sec. 1, T10N, R12W, S.M.
'12. PEB, MIT ~O.
76-77
RT, GR, ~'1~)*{17. ELEV. CASINGHEAD
I 75' ESL
~NTERYALS DRILLED BY
CABLE TOOLS
23. WAS DIRECTIONAL
SURV~ MADE
Attachad
24. TYPE ELECTRIC AND OTHER LOGS RUN
. .
1ES, GR-Sonic, GR-D. ensi'_ty Dipmeter
· CASING RECORD (Report all strings set in well)
CASmG SIZE [ WEIGHT, LB~T. ]
20" [ 74
13-3/8" 54..5
9-5/8" 43.5:40 '
[
LINER RECOl'%D'
GRADE ~ DF.,PT~I SET (M.D)
J-55 I 622
2-55 ] '2022
s-95 [ 8004 ,.
I
!
SIZE '[ TOP(MD) I"'iBOTTO~(MD) [SACXSC~VT*
I
28. PERFO.RAT O P ' O (In~al, ~ze and number)
8216-8266 8637-8660" 9540-9795
8270-8296 8680-8744 9888-10,045
8307-8340 8975-9'000
8469-8589 9485-9530 All 4JSPF
12rl/4t
80. PRODUCTION
C~f~N'TI~G RECOi~D
Cement to surface
Cement to surface
A~OUI~T PUL~ED
None
None
None
700 sx "G" w/.5% CFR-2
27. iUBING RECORD [
SiXtEEN (MD) SIZE DEPTH SET (i~D,) ! PACi(ER SET (MD)
- 3-1/2" 7,690 -
2-7/8" 10;096
29. ACID, SI!OT, F~A~C'TLrHE, CE~E'.NT SQUEEZE, ETC.
DIilP~{ IITI']~RVAL (MD) ! A1ViOUN'£ f.ND KIND O.F iVI~I~E~IAL USED
9888-10,045 ] 1570 gal '15% HC1
9485-9745 13000 gal 15% HC1
8469-8744 ! 2070 gal 15% HC1
DATE FIRST PftODUCTION
2-7-77
DA0Cm 0r ,ES,. [HOURS TESTED '{CHOItE SiZE {PROD'N ~R
2-24-7~ } 24 ! - {,~sT~
~OW, TUBING . [CASCO P~S5~ [CAL~~ OI~BBL.
I
' - - ~ >;~ 673
Fuel gas and sales
32. c~s~ o~' ~4kc~s~s~s
l' FRO.DUCT1ON METHOD (Flowhu.g, gas lii'[, pumping--size and type of pump)
'Hydraulic pumping - 3x2-1/Sxl-7/8 "B" Kobo
OI.I..,~BIB L.
I' J8 7
I 837
J WELL .STATUS (Producing or
~,~ut-~n).Producing
WAI,~A%--BBL. J GAS-O~L rid%TIO
i 2 I 3.243
] 2I 4~
J TEST WITNESSED B~
Chronological drilling hiStory,.logs, directional survey~ core analysis
3~. I hereby eert~ t _h~t th_ejj//~,,, foregoing~.~~~,_ and attaehed~ ./~f'inf°rmRti°n ill completer and correct &s determined, from .l,-availRble record74_/'~/'"77',
SIGNED t' ~f~'/.~.~6 TITLE A ea Superintendent DATE .........
*(See Instructions and Spaces for Additional Data on Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct w-e!'t complet.o'n-report er~d- lag on'
all types of lands and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (whe..,'e not o..'herwise shown) for depth measure-
ments given in other spaces on this form and in any attach:~e:~ts
Items 20, anci 22:: If this well is completed for separate prco~uc.'-ion from r.~.ore th~n one interval zone
(mull~ple completion), so state ~n item 20, and in item 22 show the p,cJuc;..":g intcrx,-al, o: ~nterv~ls,
top(s), bottom(s) and name (s) (if any) for only the interv.~! reported in item 30 S,~;brr,;t a sep,~rate report
(page) on this form, aclequately identified, for each add;t~o,al inte~vnl to be seperately producert, show-
ing the ackJitionsI data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this -well should show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produc~l.
(See instruction for iterr, s 20 and 22 above).
34. SUMMAlt¥ ¢}p* FO~.A~A'I"I¢}N 'I'F~'I'S IN('i. UI}IN¢; INT~RVA~ T~S'FED I~H~SUR~ DAT~ ~ ~OV~RI~ OF OIL ~AS_
35. G~GIC MARK~
~VAT~ AND MUD
DST #1, tested 10,302 - 10,683'
i i
got deCa~Zs og CesC see repor~ dated ~anuary 3, Z977 ~n the attached
chrono~og~ca~ dr~Z~ng hLsCory. ~e~uga 3830
Sca~e "A" 6060 5806
State "B" 6560 6261
-
36. COIIE DATA. A'I'I'A('I! 11~1[~ D[R~I~ON.~ O~ LI-~IIOLOGY.. POROSITY. FHAC~. APP~
..
see a~ched Core Lab Ana~ys2s
Core #~ 8470-849~' recovere~ 2~.2~~ - sand an~ ~' conglomerate
Core #2 84%-8~00' recow, re~ ~' - conglomerate
Core #3 ~0,84~-~0,860~ recove=ed ~8' - sha~e w/sand s~r~ngers
ANCHORAGE A PdT. A
GP 18742 WELL 26
PAGE 2
10-19-76
10-20-76
,
10~2776
:
Granite Point' 18742 Well No. 26 Inc.
PBD 1970' , RURT.
Bit 1, 12-1/4, S3S, 3-14, clean-out run.
Trip 3/4, rig repair 2, tst csg 1/4, tst BOP's 11, RURT 10.
Finish level der. rick, tst BOP's to 3000 psi, witnessed by Alaska DOG, ok.
Repair Kelly swivel wash pipe packing, install bowl prbtector. TI x
bit x.tst 13-3/8" csg..to 1000 psi, ok. Complete skidding mud prop
skid x RU same.
Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, Imco, 'Amoco°25PC)
Total cost to date $66,000.
TD 2052' mixing mud, 82' sn-sh, 1 10 500
' . ' , , ·
Mud 8.5, 42, 11.5, 9.5, 10, 8, 2/8, 1.2, 750, 40, O.
2/32, 175, 20, 10, 0, 0, desander x desilter off.
PP 1250, 500, 2, 98, 6x8x85, 6x8x85'.
Bit l, 12-1/4, S3S, 3-14, 2052, 80, 3-i/4, 24.6, 10-20, 80, 5-4-I,
rubber locked x drug.
Bit 2, 12-1/4, .S3S, 3-13, Inc;
Survey 2040, 17-1/4, N4iW.
BHA bit, RWP stab 9.30 x'9 x 2-7/8, XO 1.i1 x 8 x 3-5/8,' monel DC 29.78 x
8-1/8. x 2-7/8, 12-1/4 .non-mag stab 5.63 x 8 x 2-13/16~ monel DC
29.66 X 8-1/8 x'2-7/8, XO 2.26 x 7-3/4 x 2-11/16, 12" sleeve stab.
4.62 x 8 x 2-7/8, 7 spiral DC 216.99 x 8 x 2-7/'8, XO 2.56 x 7-'3/4 x
2-7/8, Dailey..jars 33.50 x 6-1/4 x 2-1/4, 20..jts.tg~DP ~12.19 x 5 x 3,
105,000#.
Drlg 3-1/4, trip '3-1/2, circ 6-1/2, log 5-i/4, other .5-1/2.
Mud cost $1183, $1].83.'
Spud 0730 hrs, 10-1.9-76.
Finish RU mud props x service lineS,.drl float collar, cmt, shoe x 2022'.
Drl 2022-2052' circ tst fm x shoe' to ].]..8 ppg equivalent, ok TO,
, , .
RU GOI x run CBL,. top cmt 140'. Run.Eastman gyro survey, PU BHA, TI
. x wash to btm. Disp hole'x 50 BFW x LSND.mud, mix mud x build volume.
Granite Point 18742 Well No. '26 I~c.
TD 2833', drlg, 781, sn-sh-coal, 2..
Mud 8.6, 43, , 9, 11, 11, 2/12,'2, 750, 40, 0.
2/32, 175, 24, 11, 6, 0, desander 8.6, 11.2, 2, desilter 8.6, 9.2, 8.
PP 2500, 530, 3, 104, 6xSxg0, 6xSx90.
Bit 2, 12-1/4, S3S, 3-14, 2764, 712, 16.5, 43, 35-40, 50-80, 4-6-1'.
Bit 3, 12-]./4, ~;])S, 3-].2, ]:nc, 69,' , , 40, 80, ]:nc.
Suryeys 2294, 17-1/2, N36W; 2723., 19, N38W.
BI~ bit, RWI) stab, ].ead DC 7.54 x 7-].3/16 x 2-7/8, 12" sleeve stab 4 62'
· ,
XO 1.11', monel I)C 29.78', 12-1/4" non-mag st'ab 5.6'3', monel DC
29.66', XO, 7 spiral DC, XO, Dailey jars, 20 its HWDP, 112,000#.
Drlg"17-3/4, trip 3, survey 1, circ'l-1/2, 'other 3/4.
Mud .cost $7426, $8609.
Circ x cond m~d, 'dr]., survey, drl, circ, survey, TO. for bit, change BZLA,
TI x drig.
, ,
ANCIIOR^Ci". ARE^
GP 18742 WELL 26
PAGE 3
10-22-76
~0-25-76
Granite Point 18742 Well No. 26 Inc.
TD 3755', drlg, 922, sn-sh-coal, 3.
Mud 9, 43, 9, 8.5, 10, 10, 2/13, 4.8, 600, 40, 0.
2/32, 175, 23, 15, 30, 0, desander 9.1, 9.5, 1.5, desilter 9.1, 9.6, 10.
PP 2500, 530, 3, 104, 6xSxg0,. 6x8x90.
Bit 3, 12-1/4, SDS, 3-12, Inc, 991, 24, 41.2, 50-55, 80-60, Inc.
Surveys 3120, 18, N38W; 3613~ 15, N39W.
Bib% same, 132,000#.
Drlg 22-3/4, survey 1-1/4.
Mud cost $2450, $11,060.
Drl, survey x 3120', drl, survey x 3613',.drlg.
Granite Folnt 18742 Well No. 26 Inc..
TD 5522', rep mud pmp, 695-560-512, sn-sh-coal, 6.
Mud 8.9, 42, 9.2, 9, li, 11, 3/18, 4.2, 450, 20, 0.
2/32, 175,'23, 16.25, 21.75, 0, desander 9, 11.5, 3, desilter 8.9, 10.3, 12.
PP 2375, 530, 6, 104, 6xSx90, 6xSx90.
Bit. 3, 12-1/4, SDS, 3-12, 3808, 1044, 25-.1/'4, 41.3, 50+, 60, 6-4-I'.
Bit 4, 12-1/4, SDS, 3-12, 4749, 941, 27-3/4,. 33.9,. 50/55, 60/70, 7-5-1.'
Bit 5, 12-1/4,.$33, 12-12-13, 5388, 639, 19-1/2, 32.7, 45/55, 120, 6-5-1'.
Bit 6, .12-1/4, S33, 12-12-13, Inc, ].34,· 3-3/4, Inc.
Surveys .3957, 15, N41W; 4448, 18, N38W; 4693, .19, N37W; ·4939, 20-3/'4, N36W;
5340, 22-3/4, N37W..
BHA bit, RWP stab, lead collar 7.54', XO, monel DC,. 12-i/4"'non-m~g stab,
monel. DC, ,XO, 12" sleeve stab, 7 spiral. DC, XO, Dailey jars,' 20'jts
HWDP, 160,000#. ,. II
Drlg 52, trip 14-1/4, survey 3-3/4, other 2. ..
Mud cost $4053, $3616, $470i; $23,432.
Drl, TO x change· BI.IA x rubbered.'pipe.. Ti x drl, change pmp'swab~ d~l,
survey x 3957', drl, survey x 4448', drl, change pmp swab, drl,
surv. eY x 4693','T0 for bit x change out' 28 jts rubbered DP, TI x
drl, survey x 4939', drl, .survey x.5340', TO x change bit'x 20 std~
rubbered DP.' TI x'CO'bridges 4926-36', 4961-65', 38' fill on btm,
drlg, lost pmp #1 x 0600.
10-26-76
Granite Point 18742 Well No'. 26. Inc.
TD 560'8', turbodrlg,'86', sn-sh-coal, 7. " '
Mud 8.9, 44, 9, 9, 11, 13, 3/22, 4.2, 45·0, 40, 0.
2/32, 175, 24, 16, 22, O, desander 9, 11.6, 2, desilter 8.9, 9.8, 12.
PI" 1300, 500, 7, 98, 6x8x85, 6xSx85.. "
Bi.t O, ]2-1./4, S'3'3, .12-].2-J.3, ~3570, .[}iii, 5, 37.'0, 40-50, ].20, 2-2-1.,
TO for turbodrill.
Bit 7, 12-1/4., MX3A, open, Inc, 32, 2-1/2, 12.8, 5-12, turbo, Inc.
Survey 5518, 24-1./4, N37W.
BiL& bit, hit sub' 1..62' x 7-5/'].6 x 2-3/8, turboclrl 25.].0 x 6-3/4, 1-1/2'
bent sub 1.0 x 7-3/4 x 2-]./4, XO ]..65 x 7-3/4 x 2-]...5/].6, 2 monel DC
59.4~ x 8-i/8 x 2-7/8, XO 2.26 x 7-3/4 x 2-1i/1.6, 1 stco.]. DC 31.16 x
.8' x 2-7/8, XO 2.56 x 7-3/4 x 2-7/8, Dailey jars 33.50 x 6-1/4 x 2-1/4,
20 jts 5" IlWDP 612.19 x 5 x 3, 125,00()t/.
Drlg 3-3/4, trip 5-1/2, rig rep 7, survey 1-1/4, cite 3/4, other 5-3/4.
Mud cost $1204, $24,637.
Lost fll triplex x RU Uowc0 T-i0 to circ hole, drlg"x 1 triplex, x T-10,
circ x lost Howco pmp' Survey x'5518', TO x. PU. turbodrl, cut dr. lg.
line x TI to 2000'. Change out fluid end #1 pmp. Finish TI x turbo;
',,, , , ..... ,, .., ., :',,., r ,,,1 .. .,? ~, ,,~'
...,.~ ................. .,--
·
ANCHORAGE APd~A.
GP 187.42 WELL 26
PAGI': 4
10-27-76..'
..
10-28-76
Granite Point ].8742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC)
Total cost to date $20.8,000.
TD 5665', ream turbodrl run, 57', sn-sh-coal, 8, 10,500.
Mud 8.9, 43, 9.2, 9, 11,'13, 3/20, 4.2, 400, 40, 0.
2/32, 175,. 24, 15, 23, 0, desander 9, 10.3, 2, desilter 8..9, 9'.~5, 12.
PP 2'375, 530, .6R, 104, 6xSx90, 6x8x90.
Bit 7, 12'1/4, MX3A, open, 5665, 89~ li-3/4, 7.6, 8-12, turbo, 7-8-0,
1/8" out x seals gone.
Bit 6R,' 12-1/4', S33, 12-12-i3-Inc.
BHA bit, bit' sub. 3.01 x 7-11/16 x 2.-7/8, ].2-1/4" sleeve stab 4.62 x 8 x
2-7/8, XO 1.11 x .8 x 2-7/8,' monel DC 29.78 x 8-1/8 x 2-7/8, 12~1/4"
non-mag stab 5.63 x 8 x 2-13/16, monel DC 29.66 x 8-1/8 x 2-7/8,
XO 2.26 x 7-3/4, x 2-11/16, 7 steel DC 216.99 x 8 x 2-7/8, XO 2.56 x
7-3/4 x.2'7./8, 'Dailey jars 3.3.50 x 6-1/4 x 2-1/4, 20 ]ts HWDP 612.19.x
5 x 3, 165,000~/.
Drlg 10-1/4, trip 7-1/4, survey 4-1/4, circ 3/4, other 1-.1/2.
Mud cost $2267, $26,904. ..
.Turbodrl, survey x pull steering tool, turbodrl, .puli eye t~oi'x repair
x rerun, turbodrl, prop. pill x TO x eye. tool, TO x turbo x LD Same,
PU x TI x B}bi, ream 5576-5665'.
Granite Point 18.742 Well No. 26 inc.
TD 5811', turbodrlg, 146', sn-sh-coal, 9.
Mud 8.9, 42, 8.5, 9, 10, 12, 4/23, 4,1,'300., Tr,.0.
2/32, i75,'21.,. 15,.23, 0, desander 9, .t0,.'l, desilter 8.9~ 9.2,. 7~5.
PP 1375, 530, 8, 104, 6x8x90, 6x8x90.
Bit 6R, 12-1/4~ S33, 12-12-13, §768, 103, 8-1/4, 12.5, 25-'30, 120, 6-6-I,
ream turbodrl run.
Bit.8, 12-1/4, S33, open, Inc, 43', turbodrl No. 2..
Survey 5654, 24-1/4, N4~W;.5726., 24, 'N43W.
'BI.iA bit, bit sub, turbodrl, 1-1/2~ bent sub, XO, 2 monel DC, XO, 1 spiral
DC, XO, Dailey'jars, 20 ]ts HWDP, 135,000#.
Drlg 12-1/2, trip 4-3/4, rig rep 1/2, survey 4-1/2, 'other .1-3/4.
Mud cost $2357, $29.,262.
Finish ream turbodrl run 5576-5665', drig, surveY x 5654', drl, survey x
5726'~ drl. Pmp pill x TO x PU turbodrl for run No. 2 x TI to 5706'..
Wash 6.2' to btm X 5768', rep break-out line, RU SDC. x run eye x
orient tool, turbodrlg.
ANCHORAC, E AREA .
GP 18742 WELL 26
PAGE 5
10-.29-76
11-1-76
Granite Point 18742 Well No. 26 Inc.
TD 5953' drlg, 142' sn-sh-coal, 10
Mud .8.9, 42, 8.4, 9, 10~ 13, 4/22, 4.1, 300, Tr, 0.
2/32, 175, 22, 15, 23, O, desander 9.1, 9.3, 2.5, desilter 8.9, 9.3, 10'.
PP 2250, 530, 9, 104, 6x8xg0, 6xSx90.
Bit 8, 12-1/4, S33, open, 5859., 91, 8-1/2, 10.7, 8/].2, turbo, 4-4-I, turbodrl.
· Bit 9, 12-1/4, X1G, 12-12-13,. Inc, 94' 8 11.9 30/35 75 Inc - ream
turbodrl run x drlg.
Surveys 585i, 23-1/2, N49.5W; 5914, 24, N49.5W.
BRA.bit, bit sub, 12-1/4".E-Z change stab, XO, 2.monel DC, 12-1/4". no~-mag
· stab, XO, 7 steel DC, XO,. Dai~ey jars,. 20 jts HWDP, 170,000#.
Drlg 12-1/4, trip' 4-3/4,'rig rep 1, survey 1, other 5.
Mud cost $2355, $31,617.
Turbodrl, pull SDC x RD same, pmp pill'x TO x LD turbodrl. PU BHA x new
bit X TI to 5769', wash x ream 90' to btm. Repair leak in.mud line
union, drl, circ x survey x 5851' d~lg to 59'53'
Granite Point 18742 Well No. 26 Inc.
TD 6266' turbodrlg 97-62-154 'sn, sh-coal, 13
Mud 8.8, 41, 8.5, 9, 10, 11,~ 4/17, 3.4, 300, 20, 0.
2/32, 175, 22, 13.75, 18.25, 0, desilter 8.8, 10.1, 12, 'desander off.
PP 1300, 530, 13, 104, 6x8x90, 6x8xg0.
Bit 9,.12-1/4, X1G, 12-12-13, 5964, 105,. 8-3/4, 12, 30/35, 75, 4-8-1,
Pull for turbodrl. ~
.Bit 10, 12-1/4, .b~3A, open, 6080, 116, .9'1/2,'12.2,. 8/12,.turbo, '4-5ri,
turbodrl No..3.
Bit 11, 12-1/4, MX1G, open,'6112, 32, 7,. 4 6, 8/12, turbo, 8-6-0-3/4"
turbodrl No. 4.
Bit 12, 12-1/4, X1G, 12-12'213, 6231,. 119,..3-1/2, 34, 25/30, 75/90, 3-'3'1,
ream turbodrl run No.' 4.
Bit 13, 12-1/4, MX3A, open, Inc, 35,.2,.17.5, 8/10', turbo, Inc-turbodrl
NO. 5'. ,
Surveys 6130, 24,. N60W; 6190, 25, N60W.
Bt~ bit, bit'sub, turbodrl, 1-1/2° bent sub, XO, 2 monel.DC's, X0, 1 steel
· DC, XO, Dailey jars, 20 its }B~DP, 150,000#.
·
Drlg 26, trip 21-1./4, survey 3, circ 6-1/4, other 16-'1/2.
'Mud cost $].749, $3701, $2229; $39,296.
Drl. to 5964', c:[.rc x TO x,PU turb~drl - run No. 3. TI x turi>odrl,, wasl~
bridge or ledge x 5780', finish Ti to 5950'., ItU SDC x run eye x.orient
tooi, wash 14' to btm, turbodrl to 6080', circ btms up, TO x SI)C, prop
pil.1 x TO x turbodrl No. 3, TI x turbodrl No. 4, TI x SDC X run eye x
orient tool, wasl~ to btm, drl to 6.112' x tuebo.drl stalling, pull eye
x TO x turbodrl No. 4 x LD same. Change BHA x TI x bit No.. 12 x SLM.
Wash x ream 5598-6112', drl, surveY.x 6130', drl, survey x 6190',
circ x pmp pill, TO x LD BIIA, PU'turbodrl x TI, run SDC eye x orient
'turbodrl, drl 30' fill, turbodrlg - run No. 5;
ANCHORAGE AREA
GP 18742 WELL 26
PAGE 6
11-2 -76
11-3-76
Granite Point 18742 Well No. 26 Inc.
TD 6427', drlg, 161', sn-sh-coal, 14.
Mud 8~8, 42, 8, 9, 12, 12, 4/16, 3.4, 350, Tr, 0.
2/32, 175, 20, 13.75, 18.25, O, desander 9, 10.9, 2'5, desilter 8 9,
9.6, 12. '
PP 2250, 530, 14, 104,. 6x8x90, 6x8x90.
Bit 13, ~X3A, open, 6310, 79, 8-3/4, 9, 8/12, turbo, '6-6-0-1/2", turbodrl
run No.'5.
Bit 14, MX1G, i2-12-13, Inc, 117, 8, 15, 14.6, 45, 80/90, Inc.
Surveys 6345, 24, N69.5W.
BIIA bit,~ 12-1/4" sleeve stab, XO, mohel DC, .12-1/4" non-mag stab, monel
12"
DC, XO, 1 spiral DC, sleeve stab, 6 steel DC, XO, Dailey jars,
20 its HWDP, 215,000#.
Drlg 14-1/4, trip 5, survey 1, other 3-3/'4.
Mud cost. $2579, $4!,876.
Run. SDC eye, turbodrl, p~ll out x eye tool,'TO x LD 'turbodrl, PU BltA x
TI'x 6200' wash 6200-6280' X ream 6280-6310' 'drl,'circ x survey
x 6345' drig.
Granite Point 18742 Well No."26 Inc. (PDC Rig 152, Imco, Amoco 25PC)
Total cost to date $420,000.
TD '6535' turbodrlg, 108' sn-sh-'coai, i5, 10,500.
Mud 8.9; 43, 8.6, 9, 13, 11, 3/18, 4.2, 350, 20, 0.
2/32, 175, 21, 15, 23, ~0, desilter 8.9, 9;1, 12, desander off."
PP'1575~ 530, 15, 104, 6x8x90, 6x8x90.
Bft 14, 12-1/4, ~X1G, 12-12-13~. 6495, 185, 14, 13.2, 45/50, 85,.6_6_I.
Bit i5, 12-1/4, MX1G, 0-20-20~ Inc, 40, 3-1/2 ' ll.4, i0/12 turbo
turbodrl'run No. 6. " ' ' '
Surveys.6436,'23-1/2, N68W.' '
Bib% bit,' bit sub, turbodrl, 1-1/2° bent .sub, XO, 2 monel DC, XO, i steel
DC, XO, Dailey jars, 20 jts HWDP, 160,000#.'
Drlg 9-~/2, trip.6,'rig rep 1/2, survey 1, .circ .1, other 6
Mud cost ~.2206, $44,082..
.
Drl, repair No. 2 pmp, drl, Survey x 6436' .dri lost power 1 hr, circ,
TO 'x PU turbodrl. ' '
,
!
ANCHORACE AREA
GP 18742
PAGE 7
WELL 26
11-4-76
1'1-5'76
Granitc Point 18742 Well No. 26 Inc.
TD 6752' drig, 217, sn-sh, 16
, ·
·
Mud 8.9, 44, 9.2, 9, ].4, 13, 4/24, 4.2, 400, 20, 0.
2/32, 175, 22, 15, 23, 0, desilter 8.9, 9.2, 12, desander off.
PP 2200, 530, 16, 104, 6xSx90, 6x8xg0.
Bit 15, 12-1/4, X1G, 20-20-0, 6578, '83, 7-1/2, 11, 10/15, turbo, 6-6-I,
turbodrl No. 6.
..
.
Bit 16, 12-1/4, MX1G, 12-12-13, Inc, 174, 8, 21.8,. 45, .80, Inc.
SurVey 6621,. 22-3/4, N76W.
BHA bit., 12-1/4" stab 5.50 x 7,7/8 X 2-7/8, lead collar 7.54 X 7-13/16 x
2-7/8, XO 1.11. x 8 x 3-5/8, monel collar 29.78 x 8-1/8 x 2-7/8,
12-1/4".non-mag stab 5.63 x 8 x 2-i3/1.6, monel collar 29.66 x 8-1/8 x
2-7/8, XO 2.26 x 7-3/4 x 2-11/'16, 1 steel DC 31.].6 x '8 x 2-7/8~
12'-1/4" stab 4.62 x 8 x 2-7/8, 7 steel DC 217.03 x 8 x'2-7/8, XO,
Dailey jars 33.50 x 6-1/4 x'2'1/4, 2.2 jts 5'.' HWDP, 180,000~.
D'rlg 12, trip 6., rig rep 1, survey i, .circ 1/4,'.other 3-3/4.
Mud cost $2374~ $46,455.
.
Orient SDC eye, drl, circ, puli eye tool, TO x change BI. LA 'x PU new .jars
x TI, wash x ream thru turbodrl run x 6460-657.8'. Change swab No. 2
pmp, drl, survey x .6621','drig.
Granite Point 1874.2 Well No. 26 Inc.
TD 7020', drlg, 268', sn-sh, 17:
Mud 8.9, 44, 8.6', 9, 14, 14', 4/20, 4..2', 400, 20, 0.
2/3.2,..175, 22, 15, 23, 0, desilter 8.9~ 9..2, 12, desander, off..'
PP 2400, 530, 17, 104, .6x8x90,..6XSxgO..
Bit 16, 12-1/4, MX1G, 1212-13, 6863, '285, 15-3/4,.'.18, 45-50, 80, 7-6-.1.
Bit 17, 12-1/4, MX1G, 3-12,· Inc, 157, 7-3/4, 20.2, 50, 100, Inc.'
Surveys 6747,. 22-1/,2, N76W; 6807,' 22-1/.4, N76W; 6959', 22~'1/4, N76W.
BHA' same, string wt 190,0001[.
Drlg 15-1/2, trip 4, rig rep 3/4, survey 2-3~4~ other 1.
Mud cost $3'004, $49,·354'
Drl, survey x 6747', rep mud line, 'dri, survey x 6807', trip for .bit x'
wash x ream 50' precautionary, drl, survey, x 6959' drlg
ANCHORJ~GI': AREA
GP 18742 WELL 26 '
PAGE 8
11-.8-76
11-9-76
11-9-76
11-10-76
Granite Point 18742 Well No. 26 Inc.
TD 7836, drlg, 280-277-259, sn-sh, 20.
Mud 8.9, 43, 9, 9, ifF, 13, 14/18, 4.2, 350, 20, O.
2/32, 175, 21, 15, 23, O, desander 9, 10.3, 2, desilter 8.9, 9.6~ 12.
PP 2550, 530, 20, ].04, 6x8x90, 6x8x90.
Bit 17, 12-1/4, ~D(1G, 3-12, 7188., 325, 13-3/4, 23.6, 50, 100, 7-5-I.
Bit 18, 12-1/4, X1G, 3-12,. 7402,' 214, 11-1/2, 18.6, 50, 100, 7-5-I.
Bit 19, 12-1/4, SDGH, 3-11, 7638, 236, 16-1/2, 14.3, 50, 80, 7-5-0-1/8".
Bit 20., 12-1/4, SDGH, 12-12-13, Inc, 198, 12-]./2, 15.8, 55,.100, Inc,
Surveys 7132,. 22-1/2, 'N76W; 7365, 22, N75W; 75.77, 21-1/4, N72W.
BltA bit, 12-1/4'.' sleeve stab, lead collar, XO, monel, 12-.1/4" non-mag
stab, monel, XO, 12-1/8". sleeve stab, 6 steel DC, XO,' Dailey jars,
22 jts ~B~P, . 192,000~t.
Drtg 47.-1/4, trip 16-1/2, rig rep 2-1/4, survey 2-1/4, circ 1/2, other 3-1/'4.
Mud costs $1427, $3278, $35.84; $57,644.
'Drl, circ, survey x 7132', TO x LD 29 jts rubbered DP, tst BOP's 2500.psi,
ok. Repipe shaker discharge line~ TI x..PU 29 jts plain DP,' ream
.bridge 6852-6890', drl~ survey x 7365', trip for bit, cut drlg line,
wash x ream 30' to btm, drl x hole 6ond good, drl, survey x 7577',
trip for bit, drlg.
Granite 'Point 18742 Well No. 26 Inc.
TD 8'013', trip, 177', sn.-sh, 21.
Mud 8.9, 46, 8.5, '9, 15, 14, 4/23, 4.2, 350, 20, '0.
2/32, 175, 21, 16.25, 21.75., 0, desander 9.1, 11.5, 2, desilter 9, 9.6, 12.
PP 2600, 530, 21, 104., 6XSx90, 6x8x90.
Bit 20, 12.,1./4, SDGH,.12-12-13', 7851, 213, .14-1/4, 14.9, 55, 100, 5-6-1.
Bit'21, 12-1/4', SDGH, 12-12-13, 8013, 162., 10.-1/2,. 15.4, 55., 100, 7-6-0-1/8".
Bit '22, '12-1/4, X1G,. 12-12-13, Inc - TI.
'Surveys.7794, 21, N73W; 7968, 21, N71W.
BHA same, 200,000~t. ' '. '
Drlg. 12-1/4,: trip 9-1/4, survey'l-i/4, cir.c 1/4, other 1.
Mud Cost $3432, '$61,076.'
Drl,.circ, survey x 77'94", trip for bit, CO bri'dge. 7452-7470', 35' fill
on btm, drl,,survey x 7698', .trip for bit.
G~'rtn:l.t:~: 'l.'o:i.C 18742 We.il No. 28 ],n,c.
l?l~,l) 9873' WI.' dow,~
Granite Point 18742 Well No. 26 ].uc. (PDC 15'2, Imco, Amoco 2'.JPC)
Total cost to itate $549,000.
TI) 82].1', m:ix:i, ug nut'p].~g, ].98',. sl~-sn,' '22.
Mud 9, 43, 8.'7, 8, 12, 12, 3/22, 300, 40.
2/32, 175,. 24, 13.75, 31..63. Note: Mud wt now' 8'9 ppg.
Bi~ 2.2, X1G, 2-12,..1-13, 8140' 127 Inc (NR)
];it 23, S-44, 2-12, ].-].3, Inc.
BIIA same. ,
Finish trip x 8013' x drl 12-1/4" 'hole to 8140'. Trip for bit x drl 12-1/4"
hole to 8211' x'l°st'returns 40' in. to C-3 sand.. Pipe stuck X jarred
loose x pull up to 7875'. Mix'nut hulls.
ANCtlORACE AREA
GP. 18742
PAGE 9
WELL 26
11-11-76
Granite Point ].8742 Well No. 26 Inc.
TD 8211, ci. rc out kick, 0', 23 days.
Mud 9.2, 38.
Bit 22, 12-1/4, XIG, 12-12-13, 8140, 127' 55 100 7-5-].
Bit 23, 12-1/4, S44, 12T12-13, Inc.
BRA same.
Lost ci~c 24'
Mud cost $6234, $69,043. ' '
Stuck pipe after lost returns x 8211", lost approx 180 bbls'surf'ace
volume,.ja.rred x pipe free, pull up to 7875' x build mud volume.
Fill. pipe x found fluid 'level x 750'. Mixed 3 nut p%ug pills x
experienced flow. SI'x ck press, DP x csg pres.s O. Experienced
second fiow~ circ water cut mad x gas through choke, csg press
250-100 psig x max DP press 75 psig~.no DP press response or.returns
x increased pmp rate. Mix x prop 50 bbl.' pill..10 ppg x nut hulls x
no DP press. Experienced. several kicks'x circ x incr mud wt to
9.2 ppg. Mix .x pmp two Quik-Seal pills, regain returns x DP press'
incr te 675' psig .x csg press tO 500 psig. Continue prop 9.0 ppg mud
'x 8.7 ppg returns, circ x inlet line to degasser cut out x SI to
· rep. .Csg press incr x 1250 psig while SI' Rep degasser x resume.
circ, DP 'press 1300 psig x'csg press 1400 psig. Bled csg pr.ess
thru. choke to reduce DP press to 600 psig x csg press, to 700 psig. ~
Circ thru choke X final csg press 175 psig x'DP press 600 psig.
Mix x prop 50 bbl Quik-SeaI' pill, circ, csg press 0 psig x DP press
'500 psig. Shut do~ p~np x open HYdril x work pipe, PU 260,000~
.
x SO 165,000//, .circ; fluid level in csg dropped x experienced flow,
SI Hydril x'put b~ck on'choke. SI DP press 0 psig x SI csg p.ress, o~,
275 psig. Resume Circ th?u choke, x' 600 psig DP pres's..
prani, te Point .1~74.2 Well No. 26 In~.
TD 8211' Circ, 0' '24 days
Mud 8.8, .33, , 8.5, 5, 7, 4/9, 3.3, 1500, '40, 0.
2/32, 175, , 10, , ,'desander 8.8, 11.8, 10.0, d'eSilter off.
PP 400,'147, 23, 2'9, 6x8x50.
Bit 22, 12-1/4, X1G, 12-12-13, 8140, 127, '10-1/4~ 12.4, 50-55, %00, 7-5-I.
Bit 23, 12-1/4, S44, 12-12-.13, Inc,' 71, 3-3/4, 19, 50, 100, Inc.
Survey 8100, 21, N69W.
BI~ same, 200,000f/.
Lost circ 2Z~.
M~d cost $6349, $75,392.
Detected kick 0600 hfs, closed llydril, SI.IH' press 0, SI CP 275, est
gain 150 bbls. Circ at 45 spin, DP press 525 x CP 375. Mix 50
Quik-Seal pill x 5 ppb fine Q.uik-Seai, pill. wt 9.2 ppg,.pmp pill,.
DP press 600 x CP 350. Final I)P press 625.x'CP .1.50, gas x wtr cut
mud returns, 9 1 ppg ~n x 8 9 ppg out.. (.,:~.~.c x attempt' to k.[ll wc]~
CI' incr to ].300, SI x RU to lubricate down annuJ, us., rep choke mani-
fold, prop' 230 bb.l.s 9.1 ppg into annu.l~r; x .1.300 psig, harl returns
through DP, mix Quik-Seal pill x 15 ppl) fine, circ p:Lll down
Bled drygao,' ,= from. c'"~'.,,,.,, c:l. rc x recover 9.3. l'~pg mud. Lost returns x
490 bbls in x returns gassy. Contin.ue to' l.)mp x ~TegaJ. t~ed mud returns,
Si x ck flow, no flow on annulus, mix x pmi) 50 bbl Quzl~-,.~c.a! pill x
20 ppb fine'x mod .Quik-Seal. Disp pill x 8.8 ppg mud x mod Quik-'
f'tt1"~'~ I'~r'l'l~''~ I'~,1 I ~',,~ '~'~, ..... .'~" ~ : ' ' ~'~ ....
....................
..
,
ANCIlO~AGE AKEA
GP. 18742 WELL 26
PAGE 10
11-15-76
11-16-76
Granite Point 18742 Well No. 26 Inc.
TD 8211' PBD 7986' condition hole to log, , , 27 days.
Mud 8.8, 34, NC, 8.5, 5, 7, 5/10, 3.3, 1200, Tr, O.
2/32, 175, 48, 13.75, 17.25, 0, cyclones r.un .as required.
PP 500, 353, 23R, 69, 6xSx60, 6x8x60.
Bit 23, 12-1/4, $44, 12-12-13, 8211, 71, 3-3/4, 19, 50, 100, 222-1.
Bit 23R;' 12-1/4, S44, open,, trip to dress plug.x condition hole.
Bib% bit., bit sub, 3 DC, XO, ·jars, 22 jts IIWDP.
Drl cmt 1/2, trip 22-1/2, 'lost circ 21-3/4, circ 21, cmt 1, other 5-1/4.
Mud cost $3460, $1583, $2139., $82,575.
Circ x condition mud x work pipe x 7850'. Mix x prop 50 bbl Pill x 10 ppb
f x m Quik-Seal x 8.8 ppg. TI from 7850'. x tag fill x 8065', .PU off
btm x'circ btms 'up x 8035'. Mud 8.8 in and out. Short trip .10 s~ds
x cir~ x little or no .gas. ~'O x' tigl~t' x 6094' x worked thru. TI x
open-ended DP to 8040' x circ btms up, returns gas 'cut. Spot 50'bbl
pill x 22 ppb coarse'Quik-Seal, x 10 ppg on btm. PU 4 stands x press
to 350 psi x lost small amt pf mud, then held. Could not reverse..
Circ x condition mud. Mix x spot 50 sx'Cl'ass G cmt + 0.5% CFR-2
mixed' 15.6 ppg from 8040-7970', in place '0550, 11-14-76. Pull
".5. stands x circ x'7582'. Close Hydril x incr press to 225 psi for
'5 'minx release. Circ.x 175 GPM x TO. TI x bit' to 7521'. x break
circ x condition mud x ..350.'GPM. TI x tag fill x 7889' x wash x
ream 7889-7906'. Circ btms up x continue wash x ream to 7970' x
hit cmt' Drl firm cmt 7970-7986' 'x circ to condition hole x mud
to 'log. .,
Gr. anite Point 18742 Well' No. 26 Inc. ..
TD 8211' logging, 28 days
Mud 8.9., 32, NR, 9.5,·.3', 5, 1/1, 4, 1200, Tr, O.
2/32.+, 175, 46, 15, 23,. 0, cyclones.down.
PP 550, 353, 23R, '69, 6xSx60, 6x8x60..
Bit 23R, 12-1/4, S44, open, 7986,' 16' cmt~ 1/2, 32., 5-10, 40-60,. 3-3-I,
clean out 'fill, dress cmt plug x condition 'to log'
Trip 4-1/4, circ 7-3/4, 'evaluation 9-1/2, other 2-1/2.
Mud cost $1539, $84,115.
Circ x condition ho].e' to log, TO x.stan~l bnck BIIA. Nipple. down flow
" ll',,~,
niPl)le x NU .kubr. icator x RU ~;C,}I].UlLII)t".I:};el:'. Ihlll '" .l. lll:[..'.ll,'t~ll Oil ,~';!>
X reran, ok. R{.i[i $ou:Lc-(ll( Q/O ccUl;l:al:t, zer,'~., in order to ,.,-et. tl~rough'
lubricator x log. approx 1000' 'Off buttom, '1.o1.', (luality.1)oor' 'l.'ull
Sonic x run Dipme. ter ]'og x stuck lO0' off bo~Com. Collapsed arms x
hold strain on tool x .came loose in 3'.0 min. TO x Dip. 6-1 sand top
x 7910' ·
AN6~IO Rf~GE AREA
GP. 18742 WELL 26
PAGE 11
11-17-76
11-18-76
11-19-76
Granite Point i8742 Well No. 26 inc. (PDC Rig 152, imco, Amoco 25PC)
Total cost to date $702,000.
TD 8211', RU to run 9-5/8" csg, , , 29, 10,500.
Mud 8.9, 37, , 11, 6, 6, 2/8, 4.2, 1200, Tr, 0.
3/32, 175, 31, 17, 20.5,'0, desander 9,.11.5, 3, desilter off.
PP 600, 470, 23R, 92~ 6x8x80, 6x8x80.
Bit 23R,. 12-1/4, S44, open,. 8000', 14'(cmt), 1-1/4, , 30, 60, '3-3-I, drl cmt.
BI-i~ bit, t2-1/4" stab, lead DC.,' XO, DC, 12-1/4" st'ab, DC, XO, 12-1/4"
stab, Dailey jars, 22' its HWDP.
Drlg 1-1/4, .trip 10, rig rep 2-1/4, circ 6, log 3, other 1-1/2.
.Mud cost $1883, '$85,998.
Fir"$h' loggi'ng, ND SWS lubricator x NU 'flow nipple x flow' line, TI x 2000',
'-Z .cut drlg line x 'change out brake band, TI x 7907' x. tag fill, circ out.
gas cut mud. .'CO fill .to 7986' x drl firm cmt'to 8000', cir'c, short trip
10 stands, circ x cond hole for 9-'5/8" csg, .TO x LD .BI.L~, remove 1.' ~1
protector. '. '
Granite Point 187Z~2 Well NO. 26 Inc.
TD 8211', set 9-5/8" csg hanger, , , 30.
Mud 8.9, 36,', 11, 5, .5, 2/5, 4.2, 1200, 20, O.
3/32, 175, 29, 18.75, 19.25, O, desander x desilter offf
Csg x cmt 2i,. Other. 3. ''
Mud cost $968, $86,9.67.
Remove bowl protector x RU to :.run csg. Run 184. jts 9-5~8", .40 x 43.5~!
S-'95 Buttress csg, circ x prop do~ tsg from 7965-8000'. Shoe x 8000",
float collar X '7910','stage collar x 2%77'.. Cmt 1st stage x 350 sx
Class G x 1/4f~/Sx Flo-cele + .6% Halad-9 + .5%'CFR-2 +..2% NFP,
i5.8 ppg. F011ow x 150 sx Class G + .5% CFR-2, 16 ppg.' Disp x mud
x good returns,, bump plug x 1000 psi x floats held'.' Drop.DV bomb,.-
open collar x 825 psi, mix x prop' 200 sx Class G neat x 1.6..2 ppg,
disp x mu~. Close DV tool x 2000 psi, held for'2 min.x bled off press
x press up again to 2000 x held 'ok. CIP 0300 hrs, 11-18-76. 'Fui.1
returns. PU BOP's x set csg hanger, hang'x Cut off 9-5/8" csg.
Granite Point 18742 Well. No. 26 Inc. ..
TI) 8211', run gyro, , , 31. '
M~I ~.9, '.if;, , .'l.I, 4, 5, 2/4], 4, J. 200, ',.!O, O.
~/32, , 34, ,.Lg, iI9, 0', de,';,aL~tle. J' ~.~, dL.!~:I/..I.L~:J.'
PP 500,. 529,. 24, 250, 6xSx90, 6xSX90.
Bit '24, 8-.1/2, X1G, open, Inc-CO run.
, 'BIIA bit, bit sub, 3 DC,. XO, Dail. ey jar.,;, 22 jts IlWDP.
'" Drlg 3/4, trip 5-1/4, log 8, other 10.
Mud cost $105, $87,072.
9-5/8;' csa 8000', 11-18-76. .,
NU BOP's,' install tbg head x tst x '2500 psi, ok. PU BII.A x TI x 2136' DP
measurement, dri DV tool, TI x 7897' x push junk to btm,. TO, RU temp
survey x gyro. RU x run gauge rin.g x stopped x 7885'. Rt,n temp
survey,, lower cmt top x 6919', upper cmt top x. 195~0'. 'Run gyro~
survey 7500-1800' x 100' benches.
ANC~{ORAGE AREA
GP. 18742 WELL 26
PAGE 12
11-22-76
Granite Point 18742 Well No. 26 Inc.
TD 8222', drlg cmt 'retainer, 0-11-0, 34.
Mu.d 8.6, 37, , 10, 5, 9, 5/10, 2, 200~, 240, 0.
3/32, , .52, 15, 3, 0, desander x desilter off.
PP 7.50, 500, 25, 234,. 6x8x85, 6x8x85.
Bit 24, 8-1/2~ X1G, ope,L, CO run'
Bit 25, 8-1/2, X1G, open, Iht-CO run.
B}LA bit, junk baslcet, junk basket, 3 DC, XO, Dailey jars, 22 jts tBqDP.
Drlg 4, trip 10-3/4, 'lost circ 53-]./2', cmt 1-3/4, other 2.
Mud cost $838, $5517, $2136; $95,565.
Finish ru'~% gyro, tst rams x ch manifold x 3000 psi x l~ydri'l x 1500 psi,.
ok. Tst cs.g to 2000. psi,. ok. PU' BItA x TI x rubbered DP. Drl float
collar"7903' drl cmt x sl~oe x 7991' drl cmt to fill x 8202' .l_p~t
. . , , ,
eirc x 7 'bbls pit. .loss,.PU to 8000', mix 50 bbl pill x 25 ppb Kwik-
Seal, attempt to. fill hole x 200 BW, no level, pmp pill x DP press O.
Mix x pmp se.cond Kwik-Seal pill, got DP press x 40 bbl .x cont prop x
disp Pill, close'l{ydril x sq x 125 psi, prop 10 bbls at'.3-1/2 BPbi,
fm'broke back to 50 psi x cont disp 40 bbl pill, mix pill f;3,' 50 bbls.
x 27 ppb c x m Kwik-Seal. C.l'o~_iLy. R!i%.., disp pill x no DP press.
Mix x .prop 200 bbl pill x 46-49 ppb reed fn..nut plug, pmp 32 BW, close
ilydril x press to 350 psi, 'bled to 250 in 10 rain, prop 1/4 BW x'press
to 400, bled to '325 in 10 rain, bleed', press x open Hydril, circ x
8.8f! mud x full rett, rns. 'TI'x 8171', lost 'circ temp x regain, wash'
-' x ream to 8211', drl to 8215' x l_,~ost__..,..returns,..~ ............ PU to' 8000' ,..prep. . to
drl without returns, TI x dr.1 without retorns 8215-8222' PU to 8000'
mix.x prop.pill ~/6, 50'b~I. x 32 ppb c,x-m 'Kwik-Seal. Disp x 116 BW x
'sq t.o 250 psi. TI x CO 8.200.-8222' x lost returns. Spot 50 bbl vis
pill x TO. TI x""i~%Z drl cmt ret'x set x .7800'. Mix x prop 300 sx
Class G x 16.2 ppg. Disp 'x 145 BW, 7 BW below retainer, sq to 9.00 ps'i,
stop pmp x preas'drop to 0, rev circ x no cmt returns, TO, PU 2 junk
baskets x TI. Disp hole x 8.6 ppg mud, drlg cmt retainer.
.
Bit 38, 8-1/2, .SDGH, 3-20,.7009, 54, 9,'6, 12,
Bit'39, 8-]./2, S[)(]~{, 3-13, ]'nc, 95, 6-1/2, 14.6, 45, 90, Inc.
· Surveys 6920, 16, N24E;.6974, 15-1/2, N16E; 7035, 16., N6E.
Bib% bit, 8-1/2" reamer 6.12 x 6-1/2 'x. 2-1/4, XO 2.98 x 6-1/4 x 2-7/8,
2 moncl DC 52.24 x 6-1/8 x 2-7/8, 8-1/2" stab /4.58 x 6-I/4'x 2-7/8,
(i l}C 184'04 x 6-.[/~! x 2-7/8, X(.) 2.55 x b-1/4 x 2-..7/~{, 5 ,it:; I1~'II)1'
152.76 x 5 x 3, Daiiey jars' 33.15 x 6 x 2-3/8,. is'j ts I1WDP 5.50.23 x
5 x 3, XO 2.1:3 x 6 x 3, 140,000tI.. '"
Drlg 15-1/2, trip 16, rig rep 1/2, sur. vey 6-1/2, circ 1-1/2, other 321.
Mud. cost $12,764, $8459, .$5978; $188,945.
Finish mix 10.4 ppg mud, ¢lisp hole x new mud, circ,'TO x LD 93 jts DI:,
RU SDC x run gyro survey to 6800',' £ID..'SDC, PU.dynadrl x TI x rubbered
D.P, RU Kelly hose on steering tool head, RU x run 'steering tool x
orient dynadrl, dynadrl 6955-7009', pull steering tool, TO x LD
dynadrl, change x PU BHA, TI, slip'drl line x finish TI, ream .6955-
7009' 'drl survey x 7035' drlg
, ,' , · ..
AI'ICUOA~AGE AREA
GP. 18742 WELL 26
PAGE 13
11-23-76
11-24-76
Granite Point 18742 Well No. 26 Inc.
TD 8222', WOC, , 35 days.
Mud 8.6, 37, , 12, '5, 14,.9/12, 2, 1500, 20.
3/32, , '56, 12.5, 5.'5, desander x desilter off.
PP 300, 265, 26, 127, 6x8x90.
Bit 25, 8-1/2, X1G, open, 8192, 382, 10-3/4, 4-6-1, drlg cmt x ret..
Bit 26,' 8-1/2, X1G, open, Inc.
BI. bi same.
Drlg 8-1/4,' trip 12~1/2, circ 1/4, cmt 1-1/2, WOC. 1-'1/'2.
blud cost $3698, $99,368.
Drl ret 'at 7800', TI x tag cmt at 7852'. Drl hard cmt to 8192i x lost
.circ. .Pull out to' 8000'. Trip,..run E-Z Drl ret x set at 7952',
circ x fill DP x csg x mud. Mix x prop 200 sx/Class G cmt at 16.2 ppg.
Disp x 153 bbls. fluid at 900 psi. Rev 7 bbls wtr. Trip for bit x
Blbi. Drl ret @ 7952", TI x feel fOr cmt. Tag cmt at 8078",. drl soft
cmt to 8109'. Pull 2 stds x ci~c, WOC.
..
Granite Point .18742 Wcll No. 26 Inc..(PDC Rig 152, Imco, funoco 25PC)
Total cost to'date $1,091,000. · '
TD 8288', TO, 68', sn~sh-coal, 36, '10,500.
Mud 8.5, 32, , 12, 3, 6, 4/5, 1.2, 1700., 20, 0.
3/32,., 59, 13.75,. , , desander x desilter off.
PP 350,' 2, 26, 140, 6x8x90.
Bit 26, 8-1/2, X1G, open, 8288', 96',.11-1/4, 8-1/2,. 20-25, 50-60, 6-6-I.
BHA same, .178,000~. ..
Drlg 7-1/4, trip 3-1/4, lost ~irc 3-1/2, other 101·
Mud cost $3548, $102,917.
Ti~ drl cmt 8109-8190", PU to '8000', circ x'mix two 50-bbl pills x.32'ppb.
Kwik-S'eal x spot 'pills,~ TI x drl cmt. x fill 8189-8222'. Shut down.
pmps x observe hole at 8201' x 8222~ x no change in FL, drl to 8232'
· . ,
'
circ x check for lost returns, ok, PU to 8000' 'x circ btms up. TI,
~..
drl 8232a8288' PU to 8000' x circ hole, TO
ii ,.
I
ANCHORAGE AI:~EA
GP. 18742 WELL 26
PAGE 14
11-29-76
Granite Point 18742 Well No. 26 lnc.
TD 8682', drig, 60-122-0-86-126, sn, 41.
Mud 8.7, 42, 9.4, 9.5, 1I, 11, 3'/9, 2.7, 250, Tv, 0.
2/32, , 20, 12.5, 12.5, 0, desander x desilter off.
PP 1200, 353, 32, 168, 6xSx55, 6x8x55.
Bit 27, 8-1/2, SDGH, open,. 8348, 60, 6-3/4, 8.8, 20/25, 60, 4-4-I.
B'it 28, 8-1/2, SDGH, open, 8470, 122, 9-3/4, 12-1/2, 25/35, 60.,. 6-6-I.
Bit 29, 8-1/2, 'Cbristianson diamond, , 8500, coring), runs.
.Bit. 30,. 8.-1/2, SDGII, 12-1.2-B, 8599, 99,. 6-1/4, i5.8, 30-40, 60, 7-5-I.
Bit '31, 8-1/2, S-44, 12-12-B, 8658, 59, 4-1/2, 13, 30-40, '80, 7-5-1.
Bit 32, .8-1/2, .F-2, i2-12-B,. Inc.
Surveys 8310, 21,.N68W; 8435, 20-i/2, N66W; 8565, 20-i/2, N65W.
BI. LA bit, .8-1/2" stab, monei DC, 8-.i/2" non-mag stab, monel DC, 8-1/2'" s~ab,
X0, 6 steel DC's, XO, .Dailey jars, 21 jts HWDP., 200,000#.
Drlg 29-1/4, trip 47-1/4, rig rep 3/4, survey 2-i/2, circ 3-1/4, et. her'37.
Mud costs $664, $1033, $5244, '$47'7, $1552; '$111,888.
Formation tops'- C-5 sand 8463'.
Finish'TO, PU Bit '27 x change Bt. LA, 'TI x 7980", ream 7980-82'88', drl. 8288'
8348', Work pipe x circ to survey, drop survey x'PU to 8000'. Attempt
to retrieve survey'x tool stuck, wire broke, 'TO x 'survey, tst BOP's x.
manifold x 2500 psi, ok. TI x new bit, wash x ream 8225-8348', drl,
work pipe, drl, work pipe, drl to 8470', PU to 7.790:, hole '.tight 8410-
8250'. Dump x clean mud pits x 'build new system, cond mud, .TI x 8470',
hole tight .8~25-84'70), 20' fill on btm, disp mud in hole., sl~ort trip to
csg x 245' tight hole, wash'x ream 8225-.'8470', short trip to csg >.' hole
in good shape, circ btms dp x clean hole for coring, sli,g pipe x'.drop
survey, TO x PU Core bbl, TI, wash x ream '8410-8470', 12"' fill o.n. btm.
Core' fm 8470-8494',. slug pipe x TO, LD.core, .recovered 21-1/4'. core-
sand x btm .4" conglo,~era'te, core bbl jamme'd, TI for 2nd core run, core..
fm 8494-8500', slowed" to less than 5 fph x'TO, recovercd 5' core,
conglomerate, stnd back core bbl, .I'U B~A., slip ×'cut'drlg line. 'TI x
8470', 'wash x ream 8470-8500', drl to 8'599', slug pipe x drop survey,
trip for.b.'it x retrieve sur. vey, drl to '8658'., tr'l.p for b'it, wash
8648-8658", drlg.
A2~CHC, Bb C,E AREA
CP. 18742
PAGE. 15
WELL 26
11-30-76
12-1-76
.Granite Point 18742 Well No. 26 Inc.
TD 8853', attempt to free stuck pipe, 171, coal-sn, 42.
Mud 8.7, 46~ 8.7, 9, '13, 14, 4/13, 2.7, 250, Tr.
2/32, , 20, .15, 10,.0, desander x desilter off.
PP 1000,' 294, 32, 154, 6x8x50, 6x8x50.
Bit 32, F-2, 3-12, Inc, ].70' Inc
, ·
BIIA bit, 8-1/2" stab 4.60 x 6-.7/16 x 2-1/4, mon.el DC 29.70.x 6-1/4 x
2-7/8,' 8-1/2 non-mag stab 4..40 x 6-i/4 x 227/8, monel DC 29.80 x
6-1/4'x 2-7/8, XO 1.30 x 6-3/16 x 2-7/8, 8-1/2 stab' 4.70 x 6-3/8 x'.
2-7/8, 6 steel DC 186.20 x 6-1/4 x 2-7/8, XO 1.90 x 6-3/8 x 2-15/16,'
Dailey'jars 33.50 x.6-1/4 x 2-1/4, 22 jts IIWDP 673.J9. x 5'x 3, 210,'000~t.
Drlg 16.-3/4,.. tr.ip 1-1/2, other '5-3/4.
Mud cost $2168, $114 057 'f ..- ~'~
, · ..~./,.~ A?. /.o~'..,' ,~ ' .- ~,--~r~-.~
Drl, pass collars x 8770', drl to 8820' , bef;'an--to.si-n.g-~.:et...u-r-ns. . 'x reduced
pmp speed x holding ok, short trip x.tight 8820-8500'. Add nut
plug x drl, pa'ss, collars, everY 15'. Drl to 8853', pipe torqued up,
attempt to PU x pipe st. uck x 8853'. ' Jar x attempt to free stuck'
pipe, spot 30 bbls lubriclean x 1.8 ppb, let soak.x jar, 'circ. x jar'
x unable to free pipe.
,,
Gr'anite Point 18742 Well 'N°. 26 .Inc. (PDC Rig 152, Imco, 7unoco 25PC)
Total cost to. date $i,196,000.. ...
TD 8853', fishing, 0, , 4.3,. 10,500.
}iud 8.7, 46, 8.5, 9.5, 12, 12, 3/18., 2.7, 250, Tr, 0. ..
2/32, 175, 19, 15, 10~ .0,. desander x'desilter
Blbi screw-in sub 1.16, bumper jars.9..05, oil jars 7.50, XO .80,.10 steel
DC 311.65, XO. 1.90, accelerator j..ars 12.63, 22 j.ts HwDP 6.73.39.
Fishing 24.. ' '
Mud cost $748,' $114,805'
Circ x jar stuck pipe. Rem'ove goose neck, RU x"run Dialog free-point.
Found top collar free, 2nd'collar stuck, free x 8'622'. Install .goose
neck x spot 20 'bbls pi.pe-lax aroul~d BI.L~, rdn string shot 'x back off X
8622'. TO x rec all HWDP x 1 steel DC x I)ailey jars. LD jars x
steel DC, PU .fishing assembly x TI. 'PU Kelly x.screw into fish x
8622'. Jar on fish x jar began to nialfun, ction, RU Dialog x run free-
point.
f%NCIIOP~A(;]; A..d;,A
3P. ].87z:2 WELL 26
PAGE 16
12-2-76
12-3-76
Granite Point ].8.742 Well No. 26 Inc.
TD 8853' fishing 44 days
· , , , , ·
biud 8.7, 48, 8, 9.5, 12, 13, 3/20, 2.7, B'0'00, 0, 0.' .'
2/32, , 18, 15, 10, 0, desander x desilter down.
PP 600, 352, , 187, 6xSx60, 6x8x60"'
Bib% same.
Fishing 24..
blud cost $686, $115,491.
Run free-pOint, found .top 4 DC free to 8746'. Run string shot x back off
x 8746', . TO ~.. fish, LD fish x rec four 6-1/4" DC. 'ri x 2000' , cut'
drlg' line, finish TI '.screw int~ fish x 8746' x'jar, press DP to
3500 psi x could not circ x no .bleed in 10 rain, jar on fish x no
movement. RUx run free-point x.string shot, pipe free below 8783'
x back off below top stabilizer, jar x'wor~ fish up.hole 20' circ x
,
cond.hole x free'circ, rec much small'coal over shaker. TO x fish x
work thru tight .' spot x 84.82'.
Granite Point 18742. We.]'.i"No..26 Inc.
TD'8853', run string shot, , , 45.' "
Mud 8.7, 47,. 7.8, 9, 12, 13, 4/21, 2.7, 35.0, 20, O.
.2/32, 175, 18, 16., 10, 0,. desander x desilter off.
PP 600, 353, , 187, 6x8x60, 6X8x60. "
Bib% same.
Fishing 24.
Mud cost $1230~ $1i6,72]..,.
Finish TO .x fish x rec one 6-1'/4"'steel. DC,'one 8-1/2" E-Z change stab,
one XO sub. Top fish x 8783'.. TI x fishing BI-lA., jar on fish, press
to' 3000 'psi to break'cir'c x no bleed, jar on.. fisl~. Run Dialog sinker.
bar x wireline jars', to 'check fill inside fish, found fill x 8790'.
Run string sho.t x attempt back off. x '8783' circ btms','up, TO x fishing
BI{A ],eft otto 6-1/4" DC x oil . ', '
· ']Jrs'x.bumper jars 'in'hol.e. Broke x
dope' all DC x'T1.. Screw in~o f.ish,.RU Dialog x TI x wirel.ine jars x
sinker bar x tag fJ. ll itlsido x 8803'". l{u~l string shot t6 .back off
x 8783'.
ANCltOI'Af:E AREA
GP. 18742 WELL 26
PAGE 17
12-7-7.6
Ci'a,~-itt: Point 18742 Wull No. 26 'l.~c.
"" 0 (3 days) cmt:-coal 48
TD 8691', dl.J.t, orr plug, , , .
Mud 8..8, 43, 8.5, 1~, 9, 8, 2/16, 3.4, 500, 'l.'r, O.
~ ' = 17 0 desilter 8 8, 9 5, 10, desander 8 8, 10 3, 3
2/32, 175, =3, 1.>, , , .....
PP 1050, 235, 33, 122, 6xSx80.
Bit 24R, 8-1/2, X1G, open, 8783, ream 383'. ..
Bit 33, 8-1/2, ~3A, 12'12-0, Inc, 16, 7-'1/4, 2.2, 0-2, 150, dress x kick
'of.f plug.
B~ bit, bit sub 3.58. x 6-1/4 x 3-1/2, 2 monel DC 52.26 x 6 x 2-13/16,"
8-1/2" non-mag s'tab 5...02.x 6-1/8 x.2-15/16, 6 steel DC '186.59 x
6-1/4 x 2-7/8, XO 1.91 x 6-3/8 x 2-15/16, DailCy.jars'33.56 x 6--1/8 X
2-1/4,..22 its II~)P 673.39 x 5 x 3.
Drlg 8, trip 13, circ 1-1/}, fishing.24, cmt'2, WOC 20, other 3-1/2.
Mud ~ost'$2090, $1972,' $478; $121,263.
'Back-off x 8783', TO x fishing assy x'pu bit, TI x ten 6-1/4" DC x oil x
bumper'jars to 8400' Wash x ream 8400-8783'
· . , .no problems, circ x
cond lhole, TO, PU 2 jts wash pipe x rotary.shoe, TI, wash x ream
8754-8783', wa. sl~. over to 8792' x tight x jarred,, washed 9' over top
of fish, torqued up x pdcked off x press incr, PU to free pipe x
could not get back over fish/ TO x LD wash pipe, oil x.bumper jars,
PU 27 j ts DP x TI to '87.8'0'. Circ, mix'x prop '75 sx Class G + .75%
CFR-2, 10% 10-2.0 sn, mixed 16'.4 ppg. Pull 5 studs x rev out .x no.
cmt returns. CIP 1800 hrs, 12-4-76. TO x WOC PU..Blh% x TI to 8367'
x hit bridge, wasll x ream, spotty bridges 'to 8600' much coal over
.shaker. Drl cmt x cOal.to 8675', plug probably, contaminated x coal,
· top x 8600' hard x 8675'
, .. Drl x .forming shoulder to get off plug.
Granite Point' 18742 Well No. 26 Inc.
TD 8724' drlg 33 sn 49.' '"
MUd 8.8i 55 7 5, 12 15 "15 6/38, 3 4 550., Tr .0' "
2/32, , 18, 16, 16, 0, desi.lter 8.'8, 9.8, 12, desander off.
PP'155~0, 294, 34, 156, 6x'8x50,'6xBx50.'
.Bit ~3, 8-1/2, ~3A, .0-12-12,' 8698, 23, 14-1/2, 1.5, 0-2; 150,"6-.6-I,
,,
dress x kick off. plug. '
Bit 34, 8-1/2, SDCJl, 0-12-12, Inc, 26, 7, 3.7, 2-5, 150, Inc.
Survey 8682, '20, N62W.
, .
BIIA" t;;]me, 202,0001/'. "'
lJrlg .1.4, I:l.'il~ 6~ ~:V~.')' .I.~ c.i. rc..I,~ ~t.ll~.~r 2.
Mud cos~ ~2296, ~21.23,559.
DrZ ~o ~orm shoulder on k~ck plug, survey, TO x re~rZeve survey~ cut clrlg
i2t'te~ TI~ wash x ream 8561-8698'~ hard ream2ng~ cSrc~ shorg rr&p, drzg;
ANCHORA{:E AREA
GP. 18742 WELL 26
PAGE 18
12-8-76
12-9,76
Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC)
Total cost to date $1,367,000.
TD 8864', trip, 140, sn-sh-coal, 50, 10,500.
Mud 8.8, 49, 7.8, 12, 13, 13, 3/30, 3.4, 600, Tr, O.
2/32, 175, 19, 15, 16, 0,' desilter 8.8, 9.7, 15, desander off...
PP 2100, 300, 35~ 156, 6x8x56, 6x8x56.
Bit.34, 8-1/2, SDGH, 12-12-0,. 8738, 40, 11-1/2, 3.5, 3-5, 150, 7-6-1.
Bit 35, 8-1/2, SDGH, 12-12-0, 8864, 126, 9-1/4~ 13.6, 15-30, 150, 5-7-1.
Bit 36, 8-1/'2, F2, 12~12-B, Inc.
Survey 8723, 19, N62W; 8850, 14-1/2, N58W.
BHA bi't, bit sub, monel DC, 8-1/2" non-mag stab, monel DC, '8-1/2'.' stab,
6. steel DC, XO., Dailey jars, 2'2 jts 1.1WDP, 202,000f~.
Drlg'13-3/4, triP 7-3/4,' survey 1, other 1-1/2.
Drl, drop survey x prop dry job, TO x'LD 25. jts DP, finish TO, cha. nge BHA x
TI., wash x ream 8600-8738', drl. Drl coal '8787-'8823',. work pipe x
pass .collars every 5' connection .x 8827' tight, PU 10' x pull 370M,
jar..x work pipe free, work x ream through coal, drl 5' x work pipe x
tight. 8790-8830".. Mix x prop 30 bbl' pill., of 12 ppg mud x continue
drlg unt. il pill. on btm, PU x work pipe x press incr 1950-2250 psi x
pi].l at .collars, work p:Lpe x hole slick. .Rec moch small coal over
'shakers, drl to 8864' drop survey x prop dry job, TO x retrieve survey
x. trip 'good.
Granite Point 18742 Well No. 26 Inc.
TD 9010' drlg 146 Sh-sn, 51
, , . , ·
Mud 8.8, '54, 7,.'10.'5, 15, 1.5, 3/14, 3.6, 500, 10, 0.
2/32, 175, '18, 1'3.6, 19.2.5, 0', desiit'er 8.9, 9.6, 15, desander off.
PP 2100, 329, 36, 175, '6x8x56, 6x8x56.
Bit 36, 8-1/2, F2, 12-12-0,. Inc, 146, '18-1/2, 7 9., 30, 60, Inc,
Survey 893"0, 14, NC.
Bl-bi bit, 8-1/2" stab, 2 steel DC, 8-1/2" .stab, 1 ~te'el DC,. 8-.1./.2" stab,
5 steel DC, XO, Dailey jars, 22 jts'.IIwDP, 206,000fJ.
Drlg 18-1/2, 'trip 3-3/.4, .rig. rep i-1/4, other 1/2.
Mud cost $3273, $127,8'33.
Finish TO, worli, on degasser,, change. BI1A x TI, CO bridge x. 8801', '35' fill
on btm, drl,.'survey x 8930' short trip 11 stnds x no tigl~t spots
Drl 8-.1/2" hole to 9010'.
/~ CHO P~A ~.E AREA'
(;P. ].8742 WELL. 26
PAGE 19
12-10-76
Granite Point 18742 Well No. 26 ]nc.
TD 9124', jar stuck pipe, 114, coal, 52.
Mud 8.8, 44, 7, 9, 12, 13, 3/8, 3.4, 400,.Tr, 0.
2/32, , 18, 15, 15, 0, desilter 8.8+, 10.8, 12, desander dwn.
PP 2100, 329, 36, 155, 6xSx56, 6x8x56.
Bit'36, 8-1/2, F2, 0-12-12, Inc,. 260, 3'0-3/4, 8.5, 40, 60, Inc.
~BIh~ bit, 8-1/2" stab 3.75 x 6.-7/16 x 2-3/8, 2 steel DC.62.55 x 6-1/4 x
2-7/8, 8-1/2"' stab 4.70 x 6-3/8 x. 2-3/8, steel' DC 31,22 x 6-1/~ x
2-7/8, '8-1/2" stab, 4.25 x 6-1/2 X 2-3/8, 5'steel DC 155.37 x 6-1/4 x
2-7/8, XO 1.91 x 6-3/8 x 2-15/16, Dailey jars 33.56 x 6-1/8 x 2-1/4,
22 .jts 1FWDP 673.39 x 5 x 3, 210,000fi.
Drlg 12-1/4, trip 1, survey 1/2,. other 10-1/4.
Mud cost $3825, ~$131,.658.
Drl, drop .survey x pull' 13 studs, retrieve survey, TI x wash x ream to'
.. btm, drl, drl coal 9106-91].0',. work pipe x pass collars, drl 9110-
9114' x slow drlg, wash x ream x work pipe, make ~onnection x drl
'to 9123', work pipe x pipe stuck on btm. .Jar x ~n.~able to free stuck
pipe. }iix x prop 30 bbl Pill 12 ppg mud x press incr 1950-2600 psi
as pill came around, circ. pill out.x rec much small coal over shaker.
Mix x prop 20 bbl.14' ppg mud x press incr 1950~2200 psi, .continue jar
x pip. e stuck.~ mix X prop 30 bbI 14 ppg mud, press :[.ncr 1950-2200 ps'i,
mix x.pmp 20 bbl 14 ppg mud x press incr 1950-2200 psi, circ btms up
x.no more coal over shakers. Continue jar stu'Ck.p.ipe X gain 1'.
ANCHOILACl;; AREA
GP. i8742 WELL 26
PAGE-'20
12-13-76
Granite Point 18742 Well No. 26 Inc.
TD 9256' drlg, 0-0-132, sn-sh-coal, 55
, ·
Mud 8.'7, 44,. 8.6, 9.5, 12, 12, 3/15, 3, 350, 20, 0.
2/32, 175, 20, 16.25, 13.75, 0, desander 9, 12, 2, desilter 8.8, 9.9, 12.
PP 1400, 32.3, 37R, 171, 6x8x55, 6xSx55.
Bit 37, 8-1/2, SDGH, open, 9080, wash x ream tO fish.
Bit 36, 8-1/2, F2, 12-12-0, 9124, 260,. 30-3/4, 8.5, 30-40, 40-50, '2-3-I,
out x.fish.
Bit 37R, 8-1/2, SDGI~,' 3-i2, Inc, 132, 6', 22, 40, 120, Inc. .,
BRA bit, bit sub, six 6-1/4" steel.DC, 'XO, 2 jts IIWDP, .Dailey jars, 20. its
HWDP, 210,000#.
Drlg 6,' trip 26, lost circ 5-3/4, circ 8, fishing 11-1/4, other 15.
Mud costs'S3987, '$3068, $1648; $140,362.
Circ x jar stuck pipe x 9124'. RU x run free,point to 9115' x'free'to
near bit. stab x no stuck' point found. Mix x pmp vis pill x.hold five
roun'ds torque, no press incr around bit, mix x pmp 16 ppg pill' x press
incr 2600-3100 around bit, rec many large cliunks coal. over shaker. RU
x run.string shot x back off x 9091' left bit, stab, one 6-1./4".DC
. '
in hole. TO'x 52 stnds x first 3 stnds tight. Lost circ x could not
fill hole x 57 bbls mud x TI to 8000'. Mix x spot three kwik-Seal
'pilis x .regain'circ after pmp 450 bbls.. Watch FL in hole x ok. Pull
5 'stnds DP, circ .x 7791' x. full returns, close.Hydril x press fm tO
'250 psi x no bleed. TO',' change B]LA x TI x 8786'. Wash x.ream numerous
bridges to top of ~fish. Circ x cond mud, sho'rt trip x lst'stnd tight.',
circ'btms.up,. TO x.PU,fishing assy x TI, Screw into fisl% x 9079;, 'jar
.
pipe. x fish free. 'TO' x. fish x LD fish x too'is. Tst rams. x'manifold
x '3000 psi x Hydril x 1500 psi, .o.k~ PU Bl-b% x. TI, wash x ream 9000-9124'
mix x prop 20'bbl.Vis Pill, 'work pipe x cond hole, press inCr 40.0'psi .x
pill around bit, .rec much small coal over shaker,'drl to 9256'.
Granite Point 18742' Well No.'~6 Inc. "
TD 9379', drlg, 123, '.sn-sh-c~al, 56,
Mud 8.8, 43, 8.2, .9, 10, 12, 3/13, 3.4, 300., Tr, 0.
.2/32, 175, .21, 13.75,. 18.25, 0, desander, desilter. '
PP ].450, 312, 38, 162, 6x8x53, '6xSx53.
Bit 37R, 8-.1./2, ~I)GII, 3-].2, 9293, 169, 8-]/4, 20.4, 40, i20, 4-5-i..
Blt 38, .~-.I./2, Jil'.l, .1'2-12-9, .l. llC, ~t0, '1'2-]./2, 6.9, .4(), 50,' .[iii.:.
,~;~,,'ve.y 9367, 10--.i./2, NC.
BIIA same, string wt 2]0,000#.
D'rlg 14-3/4, .trip 6-3/4, rig rep 1, survey 1/2, Other 1.
Mud c'ost $3319, $].43,681.
Drlg 8-1/2" hole.x drop surw.,.y x 9293', ,li;.;run. TO x ~;.l~a~.l;c bits x cut'
drlg line x TI x.wash bridge 9140-9150" x wash x'ream to btm.' Drlg
9293-9379' .
ANCtlORAGE AREA
GP. 18742 WELL 26
PAGE 21
12-15-76
12-16=76
12-17-76.
Granite Point 18742 Well No. 26 Inc. (PDC Rig 152, imco, Amoco
Total cost to date $1,486,000.
TD 9547', drlg, 168, sh-sn-coal, 57, 10,500.
Mud 8'.8, 47, 7.5, 9, ].6, ].5, 4/18, 3.4, 300, 20, 0.'
2/32, 175, 19, 16.25, 15.75, 0, desilter 8.8, 9.5, 12, desander off.
PP 1450,' 312, 38, 162, 6x8x53, 6x8x53.
Bit 38, .8-1/2, J33, 12-12-9, Inc, 254, 33, 7.7., 40-45, 50, Inc.
'Survey 9367, 10-1/2,. NC.
BIIA same, 212,000//.
Drlg 20-1/2, trip 2-1/4, survey 1, other
Mud cost $2087, $145,'769.
.Drop survey, short trip 16 stnds'to 9-5/8" shoe x hole good, retrieve survey, TI x wash 10' fill to btm, drl to 9450', short trip 16 stnds x tighg
1 stnd off btm, pull to 350,000~! x work pipe, wash 85' bacl~ t-o btm, drlg.
Gra"nite Point 18742 Well No. 26 .'inc.
TD 9790', drlg, 243, sh-sn-coal, 58.
Mud 8.8', 44, 7.8, 8.5, 12, 12., '3/.13, 3.4, 300, 20, 0.
2/'32, .175, '19, 15, 17, 0, desilter 8.8, 9.6, 10, desander 8.9, .12., 2.
PP 1450, 312, 38, 162, 6xSx53, 6xSx53.
Bit 38, 8-1/2, J33, 12-12'-9, Inc, 497, 50-1/2, 9.8, 45, '50, Inc.
Suryeys 9584, 7-3/4, NC; 9740, 1-1/2, NC.
Blbt' same, 216,000~J.
Drlg 17-1/2, trip 3, sur, vey 2, circ'l-1/2.
Mud cost $1471,. $147,240.
Drl, drop .survey, short t'rip .18 stnds x 9597' x tight x 9344', retrieve
survey, TI., drl to 9762', circ x drop survey,, short t.rip 20'.stnds.'x
tight x 9.344', drlg..
.
Granite Point.1874'2 Well No. 26 Inc
TD 9892.', circ, 102, sn-sh-coal, 59;
Mud 8.8, 42, 8.2, 9.5,..12, 12, 4/16'; 3.4, 35'0, Tr, 0.. ' .
2/32, 175, 19, 15, 17, 0, desilter 8.8,.9..4, 10, desander off ''
PP 2000, 312, 39, 162, 6x8x53,.6xSx53. '
Bit 38, 8-1/2, 'J33, 12-12-9, 9843, 550 58-1/4, 9 4, '45, 60, 2-4-'I, lost 3 inserts.
Bi't 39, 8-.I./2,' J'33,' 0-].2-12, 'Inc, /ii) " '
, 6-],/2 7 5 /~5 '
BIIA ,';;'~me, 2.1.8,()()()//.. , , · , , 50, .
Drlg 14-1/4, trip 5-3/4, rig rep 1, survey 1/2, circ 2, other 1/2
% ~ , ' .
M,d cost $].2'~9, .$]..~8 489.
Drl,. circ x surVey,. 'I.'0 x retrieve survey x survey no good,, crt drlg line,. Ti[,
w.'..~:fl~ x 'reml~ 7()' t:o l~tm, br,i~lge.x 9773-979()' <,ltl x break x 98fi7-92'
, , ,
circ 'x rec much coal over shaker..
ANCIt ORA(;I':
GP. 18742 WELL 26
PAGE 22
12~20-76
12-21-76
.Granite Point 18742 Well No. 26 Inc.
TD' 10,344', lost circ, 198-150-104,. sn-sh, 62.
Mud 8.7, 50, 9.4, 8.5, 1.3, 16, 8/28, 2.7, 300, 60, O.
2/32, 175, 29, 15, 10, O, desilter x desander off..
PP 2100, 312, 39, 162, 6x8x53, 6x8x53. ' "
Bit'39, 8-1/2., J33, 2-12, i-B, Inc, 501, 55, 9.1, 45., 50, Inc.
B~L~ same, 224,000~). "
Drlg 49.-1/2, Trip 9, ..survey 2, lost circ 6, circ 2-3/4, other 2-3/4.
.Mud cost $2102-$2720-$2148, $155,46i.
Drlg x circ, short trip 21 stds.. TI. Wash x ream 10' to btm, dr!g. Circ x
work pipe thru coal break, drlg. Survey, power failure. Drlg, drop
survey, pull 21 stds,', retrieve survey x TI, drlg. Short trip 10 stds,
tight at 10,100'. Wash x ream 10' to b~m. Drlg, short trip, tight 'at
10,100', CO bridge at 10,136:10,166'. x 10' of fill on btm. Drig @
'10,344' x lost circ. TO to 7840' x'build'volUme. Prop 20 bbi.s for'DP
disp while pulling up to 9-5/8". shoe. Mix 50 bbl Pill x'24 pPb'fine x
medium Kwik-Seal. TI to 8208'. Disp' to bit, pressure indrea, sed from
0 to 1000 psi after pumping 103 bbls, returns at surface x 119 'bbls.
Pmp 146. bbls, pill in place at 0245. Wait 15 rain .x fill hole on back
side x.i9 bbls, level dropping slowl'y. Wait 7 rain x prop 26 bbls but
hole would not fill. Mix 35 bbl pill x 53 PPb fine × reed Kwik-Seal
.
fine nut plug'. 'Pmp x disp x 138 bbl's, started getting returns at surface.
Finish disp DP x 8. bbls mu'd level, in annulus still fell slowly.' Pill. in
place at. 0600. Mix pill No. 3.
Granite Point 18742 Well No'. 26 inc. '
TD 10,344', circ x 9035' 63
Mud 8'7,. '51, 12, 9,-12, 14, 2/2 , .2.7, .250; 20, 0.
2/32, 175, 33, 17, 7, 0, desander x'desilter down.
. 55 9 1 45 50 2-5-1
Bit 39, 8-1/2, J33, 3-12~ 10,344, 501, , · , , , ..
Bit 36R, 8-1/'2, .F2, open, Inc.
B~L~ same, 228,000f).
Mud cost $11,..068, $166,529.
Wait on LC pill ~3, .fill annulus x ].3 bbls, SD proP, prop 22 bbls x could not
'fill annulos. Mix x. prop 57 bbls LCM x 34 ppb x disp x returns after prop
105 bills, d:i..sp additional 41 bbl,,~.x let set, fi. ll annul.u,,-~ x 42 bbls, TO
x clla~{~e bit:.;, 'TI x ~'~. jet:~ t.o 8945' , M.i.x :.1.~8 bl~.{, i,(',M i~:i..}.l 'I/4,
60 bbls to fill Di." .x.pr :Lncr to 250 psi,' f:Lnish l,mp pill x no re~'utn~.
.'. Pr incr to 450 psi x l0 bb'ls'disp,, returns x 39 bbls. Disp pill x
126 bbls, left 33 bbls inside'x ].55' bbls outside. PU to 8000" x W0
plug, fill annulus x 19 bbls x itole stayed full. Close llydrii x sq. x
would not pr up but hole stayed full, WO pill.. Close llyclril x pr up to
200 psi, bled' to 25 psi in 5 min, TI to 9035', circ x 37 SPM x 350 psi x
'no l'osses.
. .
/~,l CHORACE AREA
GP. 18742 WELL 26
PAGE 23
12'22-76
Granite Poi~t 18742 Well No. 26 Inc. (PDC Rig 152, Imco, Amoco 25PC)
Total cost to date $1, 574 ~ 000.
TD 10,344','build mud.volume, ,., 64,~ 10,500.
Mud 8.6, 40, 10, 8.5, 9, 11, 3/].8, 2.5, 200, Tr, 0.
2/32, ~175, 26, 16.25., 6.75, 0, desander x desilter down.
Bit 36R, 8-1/2, F2, open, Inc-. lost circ.
BHA same.
Lost' circ 22, other 2.
Mud costs $6091, $172,621.
Circ x bit x 9035',' 37 SPM x 350 psi, TI to 9344' x hit bridge, wash x ream
9344-9352' x broke thru.bridge, lost returns. Mix x pmp 69 bbl pill x
30'.ppb med nut plug, 26 ppb f x m Kwik-Seal, spot pill x 9352'. PU.
4 its to 9252' 'x fill hole x 25 bbls mud, .lost 28 bbls. in 4-3/4 hrs,
ci~c x 9252', 37 SPM x 500 psi, press decr to 350 psi x lo. st returns.
Mix x spot 50 bbl pill x 30 ppb nut p. lug, 26 ppb f x m Kwik-Seal,
returns. Mix 50 bbl pill x 25 ppb fine Kwik-Seal, 25 ppb med. Kwik-Seal,
TI to. 10,050', hole good except for~ledge x 9350' x slipped p'ast, spOt
pill x 10,050' x PU to' 7932', est losing 20 BPH.. TI to 10',060' x' hit
fill, Wash g.ream 10,060-10,080', partial returns x 37 SPM x .400 psi,
make' connection x 10,080' x lost returns. Wash x ream 10,080-10,].06'
no returns, fill. hard, lost 240 bbls while wash x ream. Mix x spot
60 bbi pill x 10 ppb coarse Kwik-Seal, PU to 79.32' x build mud volume,
hole good. . '.
ANCHORAGE °AREA
GP. 18742 WELL 26
PAGE 24
· ,
12-28-76
Granite Point 18742 Well No. 26 Inc.
TD 10,344' PBD 10 336' TI x 7" pkr, - 70
Mud 8.7, 37, 27, 11.5, 7., 8, 7/10, 2.7, 20 , Tr, O.
3/32, 175, 62, 15', 10, 0, cyclones off.
Bit 40, 8-1/2, X1G, open- condition hole.
Bit 4'1, 6", OWV, open - clean out 7" liner x drl cmt.
Dri cmt 5, trip 45-3/4, circ 13-'1/4, csg/cmt 14-1/.2, WOC' 10, evaluation
28-1/2, lost circ 8-1/4, other 18-3/4.
Mud cost $6540, $4576, $5426, $2476, $1618, $641; $193,902.
7" liner set 7728-10,336' 12-26-76
,
Build mud volume x TI to. 9221', circ x partial returns. TI to 9865' x fill
hole. Circ x partial returns.. TO x change bits x TI to ].0,050'. Wash
x ream' 10,050-10,106', partial, returns. Stuck x 10,106' 'x jarred loose..
Wash x ream to 10,.344' hard fill. Lost 700 bbls mud while Washing to
btm. Spot 50 bbl pill.x 20 ppb Kwik-Seal, short trip to 8000'. TI .to
10,344' x condition hole t~ log x TO. Run .1ES, GR-Sonic, GRvDensity
x'Dipmeter logs 10,336-8000' ' 1ES paneI failed x reran x hit bridge
x 8820'. .TI x wash bridges x 8852-8864', 9312-9400' x fill 10,068-
10,344'.. Est losing 1/3 of returns. Spot 50 bbl LC~i pill on-btm,
short trip, 'circ x TO. Run 1ES x stop x 10,200' x TI to condition
hole' for csg. Spot 50 bbl LCM pill x TO'x DP Run 2588' of'7" 26f~
N-80. Buttress liner x..BOT hanger. Land csg x 10,336'. x' top x 7728~.
Set hanger x cmt x 500'sx Class G + 1/4f~/SX Flocele + .75% ltala~-9. +
0.5% CFR-2, preblended x pix x 5.2. gal fresh wtr per sx, avg ~13.5 ppg
1st 250 sx, rdplaced cemen.ter x prop 250 sx avg'15.8 ppg. Z' Mix 85 sx
neat Class G x 15 ppg, unable to get even 15.8 ppg. Disp x 215 bbls
mu~ x did .not bump PlUg. "CII~ 0325, 12-26-76, good returns throughout
job, est lost 30-40 bbls while running x cmt liner. Pull 2 stands x
reverse, rec 10 bbls cmt-contaminated mud. TO x setting tool'x WOC
10 h~s. LD 6-1/4" collars, jars x slip~'x cut drlg line. Make
'8-1/2" bit x 9-5/8": csg scraper x TI' tO liner top .x 7728', no cmt.
Circ btms up x TO. PU 6" bit X 7" .scraper x 4-3/4" DC x 3-1/2" DP x
TI to liner top. Tag cmt x ~946' x drl cmt 9946-10,080' 'void from
10,080-10,234' x drl cmt 10,234-10,2~3'. .. , plng x 10,243', cmt to 10,336'
x drl Sl~oe x 10,336'. Circ x '1.'0.. 'Rm~ SWS CBI.,-GI~-C{.',L 10,3J.8-7700'.
Run East. mall' gyrO survey 10,3 ~' '' . '
.1. o-8.1.00'. Set lip x. 9175' install 3-I/2'~
pipe rm~s x PU x Ti x 7" RTTS pkr. Grot top per b'ond log at 8800'.
Good bond below 9050' fair to good 9050' to 8'800' little or no bond
above' 8800'.
ANC~II) RA('.I']
GP. 18742 WELL 26
PAGE 25
12-29-76
12-30-76
· Granite Point ].8742 Well No. 26 Inc. (Parker Rig i52., Ire'co, Amoco 25%)
Total cost to date $1,780,000.
TD i0,346'4g trip 2, shale, 71, 10,500.
blud 8.7, , 16.~, 11.5, 8, 11, 6/15, 2.7, 200, Tr, 0..'
3/32, 175, 4'7, 12.5., 1.2.5, 0, cyclones off.
PP 900, 220, 42, 402, 6x8x75.
Bit 42, 6" O~f 3-11, 10 346, drl retainer + 2" sh, 7-5-I.
BItA bit, boot basket, .bit sub, eight 4-3/4" DC, 3-1/2'! x 5" DP, i68,000~.
Drig 7-1/2, trip 8, circ 1'/2, tst liner 8. '
Mud cost $838, $i94,740. '"
TI x 7" 'R'rTS.pkr x set'x 7779' RU SWS .x pf 7" x 8778-80' 4SPF "Tst pfs
,
to 2500 psi x ok x release press x press liner lap'x annulus x. 1500 psi,
ok. Release press x tst pfs to 4000 psi x bled x took 3 bbls in 5 min
.x held. Release DP press X press liner lap x annulus to 3000 psi, held
·
ok x no bleed. Release RTTS x TO'x pick up 6" 'bit x boot basket x TI.
Drl EZ drill retainer x 9175' x push to btm x drl 2" new 6" hole. Circ
x s. lug pipe x TO for new bit.
Granite Point 18742 Well No. 26 Inc.
TD 10,3.75' drlg "29 sn-sh 72.
' , , ,
Mud 8.7, 54, '9.'8, il, 15, 13, 5/28, .2.7, 250, Tr, O. ,
'2/32, i75., 23, 12.5, 12.5, O, off.
PP 1650, 220, 44, 102, 6x8x75. "
Bit 43, 6" W7R2, 3-11, 10,353' 7, 6-i/4 1, 8-10 50 6-5-i drl junk
.' , . , , , , 0.
.Bit 44, 6" .J33 2-11 lB, Inc 22-~ 6, 3 6', 20-22, 50,..Inc,
, , , ,
BHA bit, bit sub 19 4-3/4"'DC,' Dailey jars~ six 4-3/4" DC, 3-1/J" DP, DP,
. . , .' 5.! I
string wt 200,00.0i[.
Drlg 12-1/4, trip 11-'3/4. ' "
Mud cost $3228, $197,968.
Finish T:I x drl junk + 7' new hole. TO x change'.bits, x PU 17 DC's x jars x
TI x drlg 6" hole to 10,375'.
ANCHORAGE AREA
GP. 18742 WELL 26
PAGE 26
1-4-77
¢:ranitli Point 18742 Well No. 26 I. nc.
TI) 1.0,683, drlg, 178-38-0-92, sn-sh-coa.1., 76.
Mud 8.8, 53, 7.8, 10, .16, 14, 3/12, 3.4, 350, Tr, 0.
2/32, 175, 19, 15, 17, O, desil.t 8.8, 9.4, lO,'desand'8.9, 10.6,· 2.
'PP 1800, 220, 45, 101, 6x8x'75'.
Bit 44, 6, J-33, 2-].1, l-B, 10,591, 238,.30-3/4, 7.7, 25, 60, 5-4-1.
45, 6~ J-33, 2-11, l-B, Reaming.
'46, 6, OWV, 3-2.1, 10,604, 13, 2-1/4, .5.8, 10-20, 100-120',' 4-S-1., Ream
10,370-10., 59i.
45RR, 6,.J-33, '2-11, i-B, 'Inc, 79, '10,. 7.9, 24, '6.0, Inc.
. .BilA same.
Drlg 37, .Trip 30-1/4, Rep 1/2, circ 6, other 22-1/4
Mud cost $894-$1153-$].249-.$1223, $202,488.
.Drlg, circ to rec samples after drlg'break., dr, lg, circ dr!g break at
10,516', short trip, drlg. Circ x TO, PU 'DST .tools x TI. Set RTTS
pkr at 10,302', tail at 10,319', Open tool, 5 rain, weak blow, 'incr
.to medium blow. SI. f'or 30 min. Open, weak' blow inc. to good bl'ow,
no gas x no pressure. Tool open. for 3 hfs, SI for 6 l~r's for FSIP.
Rev out 10 bbls mud, no gas or hydrocarbons,
DST Pressures II-IP' 4529
IFI' 219
1SI 421. '
" ].1~2 238
FF2' 275
· FSI 641' ..
FHP.4548 ~ 162°F, 2.0,289'
.
.' Re].ease pkr'at 0605 hrs. TO x I),MT fi.l, I.,1) tst tools,, rec 19 gal
S(;Cbl. '£'I x [)it 45, ream t-i.ght ho].e 10,370-.1.0,460'.. .I. or lui. nl;" ~ and
packing off. Tri. p for. mill tooth bit. .Ream J. 0,370-i0,470, tight x
.p.ackin.g off., circ. Ream 10,470-J. 0,520'.. Ream to 10,591, drlg,
.. sltort trip, wash x rea,/ 3.5' to btm. (.:.irc', .t~.-ip for bit, d.rlg..
'.
.Gl;a~lita ].k~int .18742 WcJ.i No. zO
TI) 10,841' trip 158' coai-s'll 77
}iud 8.8, 54, 8,"10, 19, 14,. 3/15, 3.4, 35.0, Tr, O.
2/32, 175, 19, i5,. 17, 0, desilter' 8.8', 9.4, 10, desander off.
PP 1800,. 220, 45R, 101, 6xSx75.
Bit' 45R, 6" J33 0-11-11 Inc, 237, 27-1/2, 8 3, 24, 60, Inc- TO
, , , · *
BIIA same, 212,00011.
Drlg 18-1/2, trip 3, circ 2-1/2. 0
Mud cost $2427, .$205,015.
Drl, short .trip t° 7" csg,. drl., short trip to 7", drl to'10,841' x bit
t~rqued, circ, TO to PU core barr'e.1.
^NCIlORACI'~ AREA
GP. 18742 WELL 26
PAGE 27
1-6-77
.1-7-77
Granite Point 18742 Well No. 26 Inc. (PDC Rig i52, Imco, Amoco 25PC)
Total cost to date $1,929,000.
TD i0,860' cond hole, 19, sn-sh, 78, 10,500.
,
Mud 8.8, 52, 7.6, 10, 16, 14, 3/5, 3.4,. 300, Tr, 0. '
2/32, 175, i8, 15.7, 16.3, 0, desilter 8.8, 9, 12, desander off
PP 1700,' 235, 47, 112, 6x8xS0. '
Bit 45R, 6" J33 0-11-11 10 841 237 28L1/2 8'3, 24 60,' 4--.5--I.
Bit 47 6''' ' ' ' ' ' ' , , .W7R2, 3--11, Inc-CO X cond hole. '
Bl-b~ same, 212,000#. '
Trip .13, circ 2-'1/4, other 8~3/4'. ..
Mud cost $2069, $207,084.
Finish T0, PU core barrel x TI, hit bridge x 10,651' x. wash x ream 10,651-
10,841'. Drop bail x circ, core 10,841-10,860,' x core barrel.jammed,
TO. x.LD core barrel x core, rec 18' shale x sand stringers,' est dip
'80-85~.' TI x Bit 47, circ x wash 26" to btm x cond hole .to log.
'Granite Point 18742 Well No. 26 Inc.
TD. 10,860.', fiji pits x SW, , , 79. ,
Trip 5-1/2, circ'.3-1/2, log 6, other 9. "
Mud cost· $1647, $'208,731.
Circ x pmp vis pill, 'short trip tO 7" csg shoe, 25' fill. Circ x 10,860",
short trip to 7" shoe, 2i' fill. Circ btms up x 10,860' x TO. RU SWS
.' .x run IES 10,830-10,338', GR-Sonic i0,826-10,336', GR-DensitY 10',660-
.. 10,332'. Sonic hung up x 10,725' x drug.10OO#'over w.t, caliper indi-
cated 5" x 10,725'. Density'hung 'up x 2-3000#'overpuli at 3 seParate
· points, canceile~l Dipmeter. LD 4-3/4" DC x jars x PU 3-1/2" DP x
clean pits. 'ri to 10,326' x open ended DP.. Fill pits x SW x prep' tO
'disp' hole x SW. '
.Granite l'oint ].87/~2 Well No. 26 ].nc.
'I'D 10,860.' TI x bit x scraper, , , 80.
Bit 4711, 6", W7R2, open, 'l. nc-CO run.
BI.IA bit, bit' sub, 7" csg scraper, 3-1./2" DP.
'rrip 5-1/2, c:i. rc J5-]/2, other: 3. ..
· ,, ...... , ,,,20ii, 6.'1 I.,
l:'lii I~.[t.,,~ x ,';c;twl.:~:, ~l.l.,,:p ',n~d x ,';e;Iwtr {~'om .1{I,33{,' l..il.i l,[t~; x
. ,
reverse':~eawtr x disp 'x diese.1 x 1.0,336~. TO x DI~, RU Dres,,:;er X
attempt to run 7" E-Z drill I';P,' could not gc.t phst liner top x 7728',
. ,
lid Dresser. 'PU 6" b:[t x 7" csg .scrapor x TI 'to lJ. lier top x 77.28".
~ .
l<otate x work ~l~ru. il.:;t time x went tl.~ru 8 more times, did not rotate
'after first pass'. Ti to 10,336' x sc{'aper..
~ CI-IORAC. I; AIIEA
GP. 18742 WELL 26
PAGE 28
1-10-77
1-11-77
1-12-77
· .
1-13-77
1-14-77
Granite Point ].8742 Well No. 26 inc.
PBD 10,310' RD perforators
RU Dresser-Atlas lubricator,, tst lubricator, failed. RD x rep lubricator. RU
same, tst to 2000 psi, ok. 'Perf x Dresser-Atlas 4" Jumbo Jet csg gun,
4JSPF,' 8216-8266' 8270-8296' 8307-8340' 846.9-8589' 8637-8660" 8680-
8744', 8975-9000', 9485-9530', 9540-9795' x 9888-10,045'. Hole .stayed
full throughout perf.
.
Granite Point 18742 Well No. 26 Inc. l,
PBD 10,310' TI x' pkr x retrievable BP
7" csg scraper, tag at 10,293' CO tO 10,3.10'
RD lubricator,1 TI x 6''l bi't, · '
Circ, .TO x bit x scraper. PU retrievable BP, taillpipe x retrievable pkr
x TI on. DP. .'
Granite. Point 18742 Well NO. 26 I~!c' (PDC Rig 152, Amoco 25 PC)
Total cost to date $2,163,5.51. "
1pBD 10,.310'. Prep tlO run BRA. TI x I}P, pkr, 330' tailpipe x BP.
Acidize laSl follows: 'Set BP @ 8368 x pkrl @ 8013. Pres tst p.erfs
8216-60 x 8270-96 x diesel to 1000 psi x bled off l tO 250 psi .in 15
min. Set BP @ 10,100 x pkr...~ 9840 x spot 1.5.70 gal 15% NC1 X'
additives over perfs 988'8-10,045. Pres annulus to 250 psi X disp ·
acid x diesel @ 1.1 BPM x 2100 psiI Set BP @ 9840 x pkr @ 9300 x
spot 3000 gal 15% HC1 over. perfs 9485-9745. Pres annulus to
· 250 psiXI disp acid x diesell @ 0 6 BPM x 3300 psi Broke back to
· l.~ . ' i ·
'~' 2200 psi ~ 1.1 BPM x 1550 gal HC11 in formation. Set BP @ 9300 x
pkr @ 8850.x spot 250 gal l15%.[IC1 over perfs 8475-9000. Pres
annulhs to 250 psi x disp x diesel @ 0.7 BPM X 3700 plsi. Set. BP'@
8850 xlpkr @ 8400 x slpOlt 2070 gal. 15% l]C1 .over perfs '846928744.
Pres annulus 'to '250 psi x disp acid x diesel @ 1,.0 BPM x 1500 psi.
After 75.0 lgal disp pres d:.'opped to 1200 p,,~l.{, x ann:l].u,:~ increased to
800' psi. Had communication x perfs 182i6-8340.. Rev out remaining
acid, retrieved BP 'x TO x pkr, talilpipe x
Granite Point 1187/1'12 Well NO.' 261 Inc.
Finish TO x pkr x plu~. TI x open-ended 3-1/2" DP.. TO, LD 3-]./2" DP'. RU x
run 3'-1/2'' tbg tailpipe. PU Kobe cavity, 3" Type "B." Rig to run dual
tbg, 1Run dual tbg, broaching eVery 1000'. 11 I
Granite PoJ.~:t 18742 Well N.o. 126 11lC.
PBD 10,310' TI x dual 3-1/2'" tbg
, ' ·
I[{ldI trouble broac[:.t~b, tbg. Check 'tally, it{lily w~-o. ng. '.['O1 to cavity. Retally
tbg x broach .tbg back in hole.
. 1
, .
ANCIIORAGE AREA
GP. 18742 WELL 26
PAGE 29
1-17-77
1-18L77
1-19-77
1-20.-77
1-21-77
i-24-77
Granite Point ].8742 Well No. 26 Inc.
PBD 10,310' hooking up manifold X lines
' .
TI x 3-1/2" tbg,. broaching every 1000', space out x 'land same. Blbi btm at 7690'
tailpipe at 10,096' ND BOP, NU tree; tst to 5000 psi. Clear tile deck.
Prep to skid rig. RREL 0800, 1-15-77.
.
Granite 'Point 18742 Well No. 26 Inc.
PBD 10,3i0'., hooking up lines x Kobe manifold..
Granite Point 18742 Well No.' 26 lnc. (Platform Anna, Amoco.'25PC)
Total cost to date $2,284,375.
P'BD 10,310', hooking up lines,
Granite Point 18742 Well No. 26 Inc.
' .
PBD 10,31~~ prep to wireline'out st'ending valve.
,
Circ down short string, up long string. Drop standing, valve, attempt to' press
tst same. Press to 1500 psi, bleeds down in 2 min. 'Unable 'to seat
standing ·valve.
Granite Point ].8742 Wel.1 NO. 26 Inc. , ' ....
PBD 10,310' fishing for standing valve.
Run Kobe pmp, would not press bp, prop. out prop, no marks. Fish for standing
valve x wireline,, unable to catch. R~n impression block, no print. Run
magnet, rec' .fine shavings 0f metal x fine wire.
.
. .
..
Granite Point 18742 Well No. 26 inc.
PBD 10,310' .Prop on tst.
Fish out standing valve, standing valve, had rubber in it. Ci. rc. Run sinker
bar to 7730'. 'Run new standing v~lve x Kobe'prop.. ]h3~p stuck at 3792'.
Wireline out prop from' 3792', pull standing valve. Run tbg gauge of
2.~89", stuck at 3750'.. Run tbg broach of 2.850" to 7400',.ok. Run
tbg s{vedge 2.890". Tight spots at 2000', 3750' x 3974". Run swedge
to 7450' 'p~].l swedge. Circ down ]'.o,g str'i, ng, ~1~ ann~].~:.;. Run standing
.vel. ye. ['~'.ess to 500 psi ,. 'b].ed off. R~n dulmmly prell, l'~:e~.~.~ Lo 2850 psi
In cavity, bled to 100 psi In 5 mLn. 1'rap. dummy up l~ole. Reset in
cavlty. Press to 2850 Psi, bled to 2000 psi In 2 min. Pull dummy prop x
standing valve. Dummy prop lind '2 ~.;cals mtn;sing, standing valye plugged x
rubber x rust. Clrc down, long string x up annulus. R~n new S~anding
valve. P~'css tsg to 1'800 p~.]t, would ]]ot I~o].d p~:'u~;s. Rt~n 3 x 2-i/8 x
]-7/8'k~..be prop Started ot~t at 1200 B}.'OI'D nE 2650 psis, 56 SI'M. Cu:
power oil rate to 800 BPOPD, 1200 psi, 40 'SpM.
?. 18742 WELL 26
kOE 30
'1-25-77
1-26-77
Granite Point 18742 Well No. 26 Inc.
PBD 10,.31.0', retrieve Kobe prop x wireline.
Prod tst showed loss of power'oil, approx 20 BPIt. Rev out pmp, had one blown
seal. Pull standing valve, valve was plugged solid x. tbg varnish x trash.
Run new standing valve on wireline, standing valve would not hold press..
Press to 1500 psi, .dropped to 0 in 1 min...Run Kobe. prop, put on tst. .Tst
,. showed loss of power oil, approx 20 BPH. In'j Press 2950 psi, power otl
rate 1100 BPD. Unseat 'prop, prop would not surface. RU wireline, found pmp
at 3900". Retrieve Kobe prop., x wireiine.
G.ranite Point 18742 Well No. 26 Inc. (GP Platform Anna, Amoco 25. PC)
Total cost to date $2,255,000.. '.
PBD. 10,310', tst 4-way valve x tbg strings. . . ..
Pull prop from 3900', pmp ok, seals ok. Wireline out SV:, .S~ clean,'no trash,
shows to have been on seat. Run new SV. SI short string. Attempt .to
press tst tbg Strings x max press 'reached was. 350 psi while pu'mping
down long string.@ 240.0 ..BPOPD. Close annulus valves x continue' to pmp .
down long string @ "2400 BPOPD. Press increased to 750 psi itl annulus
x tbg strings. Open short string, open annulus. Run pmp. Pmp on btm,
stroking at 49 SPM, 1100 BPOP. D at 2950 psi." Sh. ows -25 BPH on prod.
1-27'77
¢
, ,
',
·
, ·
1-'27-77
Granite Point 18742. Well 'No. 2.6' I'nc' ,
PBD !0,310', SI. . -
Press tst 10ng "tbg str'ing: Open annulus valve, SI sl~ort string, set 4-way valv.e
to p. mp in position x pmp down long' string (9 800. BPO.I'D" Pres'..; to 2250 psi
· ' ' x prop stroking 36 SPM.. Tst short tbg string: SI flow line valve, annulus
open, swi'tch 4-w,~y valve to prop out position x prop down. shor't string @
G.P. ]8742 Well. no. 26 (cent.theft:d)
, 2400 .BPOPD rate. In 10 rain short s~ring, press t6 10'0 psi, 15 rain to
.150 psi, 30 rain to 300 psi. During this time long' String press dropped
from 1800. psi to 0 psi x p'mp stroking. Put well on ts t, 1000 BPOPD at
2800 'psi, 38 SPM. Prod was -22 BI'Ii.' PulI prop x SV. Prop looks good,
seals ok~ gV clean, looks ok, appears to have been seated...Believe
l~ak in short tbg. string. Si well x waiting .on rig to pull tbg x BILA.
ICIiOF./~ GF ARI?:A
.~. 18742 WELL .26
~GE 31
i-28-77
1-31-77
2-2-77
2-3-7'7
2'4-77
2-7-77
.2-8-77
Granite Point 18742'Well No. 26 Inc.
PBD 10,310', SI WO rig.
..
Granite Point 18742 Well No. 26 Inc.
TD 10,310', WO rig.
Gr.anite .Point 18'742 Well' No. 26 Inc. (PDC Rig 152, Amoco 251)C)
To.tal cost to date $2,264,000.
PBD .10,'310',. skidding rig f-rom Well' No. . 32.
OC 12:'00 noon, .2-1-77.
Granite Point 18742 Well No. 26' Inc.
, , .
PBD 10,310', RU service lines.
Skid pmp house. Skid. rig fcom'Leg 1 to Leg 4.
Granite Point ].8742 Well No. 26 Inc.' '
PBD 10,310' RU tbg tools
..
.Disp short string, long. string, annulus x diesel. 'Circ x kill ~ell. Set
back-press valves. · ~ tree, ~ BOP.
,
Granite Point 18742 Well No. 26 Inc. '.'
PBD 10,310' 'pmp NG x prep to Skid rig.
Tst BOP to 2000 'psi' RU Dialog, cut short string at 7629',' ull short, string,
pull long string. LD Kobe cavity, cavity looks good,, seat looks ok. '
· Pull'x'inspect tailpipe., run tailpipe. PU new Kobe cavity, press tst to
3500 psi, ok. Run dual tbg strings, broaching long string, hydrotesting
both strings to 3500 psi. ' Found hole in short string tbg 29 jts above
'cavity. Chg'out jt. Finish running'dual tbg strings, hydrot'esting both
strings to 3500. pst,. broaching' long string'. Land tbg, lid tools, ND BOP,
NU tree, tst to 5000 psi, in~;'tail 4-way. w~lvc x lincs. Circ x disp well.
R~ ~;V, pr'en~ t~.~t to 2500 p~[., 'ok. R~n Kobe. prop. Using 1200 BPOPD. at
950 p~;i, .prop ok.' .RLg roi 06(~0, 2-7-77.
Granite Point 18742 Well No. 26 fnc.
PBD 10,310' pmp NG "
, ·
Prod avg 35 Bi'i! at 3.1%.BS&W, 1350 Bi?OPD at 2100 psi, 62 SPM.
,iCHO PJ~<;l:, A R E^
18742 WELL 26
32
2-9-77
Grani'te Point 18742 Well No. 26 Inc. (GP Platform Anna, Amoco 25FC)
Total cost to date $2,354,000_~__
PBD 10,310', pmp NG. . ......
2-10-77
Granite Point 18742 Well No. 26 Inc.
PBD 10,310' , prop.
12-hr tst: 708 BOPD x 10 BWFD x 260 MCFD'x GOR 370. 1350 BPOPD @.2100 ~si x
60 SPbl x LSP 1700 psi.
!-1i-77
2-16-77
Granite 'Point 18742 Well No. 26 Inc.
PBD i0,3iO', .Pmp NG.
.Granite Point 18742 Well No. 26. Inc. (Platform Anna, 'Amoco 25PC) Total cost' to date ~2_~R...5..,..0.0.0 ........ '
PBD 10,310', 12-hr {'st: 648 BOPD, 6 BWPD~ 504'MCFD, GOR 778, gravi.ty '41,4'~ AP.I
at 60", 1500 BPOPD at 2250 psi, 66. SPM, LSP 1300 psi..'
.2-17-77
2-22-77
Granite'Point 18742 Well No.. 26 Inc.
PBD 10,310', pmp NG. --
t3ranlte i'olnt .L~//4Z WeAJL NO. ZO' inc.
PBD 10,310', pmp NG.
Change.'pmp x SV. Prop clean, 'SV .clean'..
2-23-77 Granite Potn~ 18742 Well No. 26 Inc.
~o-rr~-¢~cO Total cost to date '"$2, 462, 000.
~'~[~'-~' PBD' 10,310', pmp'N'G.'''~' .... ~'---7'
· ,
2-28-77
(Platform Anna, funoco 25PC)
, ,
· .
Granite Point 18.)42 Well No. 26 Inc.
·
TD 10,860", PBD i0,310'. Surf Loc: Platform Anna, Leg 4, Slot 8, 7.71' FNL,
713' FWL, Sec. 12, T10N, R12W, S.M. BHL: 1019' .FSL, 3068' FEL, Sec' 1, T10N,
R12W, S.M. .Field Dev well. Con.~plcted as producer C-Unit Middle Kenai Sand'
Rig. OC 1200 hfs, 10-15'76, I~tEL 0600 hrs, 2-7-7'7.
24-hr. ts't (Kobe lift): 673 BOPD x 2 BWPD x 0.3% BS&W x 837 MCFD x 1243 GOR .x
1400 BPOPD at .2500 psi x 60 Si~M x LSP 1700 psi. (Final Report)
Eastman
A PETROLANE COMPANY
REPORT
of
SUB-SURFACE
DIREC TIOIVA L
SURVEY
........ '.'.-.. :- ..:... Arno .c.o.. "P~o d..u¢,...t.£ on Company
COMPANY
Granite Point State#18742
,.. WELL NAME
atform Arma
LOCATION
JOB NUMBER
A1076G-0204
TYPE OF SURVEY
Gyroscpic
DATE
12/29/76
SURVEY BY
OFFICE
GRAN I TI:. PO I ,,_:'-,'.T 1_8!~_~ WELL 2-~--'.- ......
JOB NO. AIO76G-0204
L!', ' EY
,DS AND A$5OCIATE5
......................................... ~Co:~D OF
....................... _A_L.L,__~ AL..C._UN:~j;_:~.Q ~'~__.P F. 8 F.O R!'i ED B Y
SURVEY
[ B ? ELECTRONIC COi"~PUTER
..... TR L! F. ............................................................................................................................. D.O.~....L.E.G ...........
' :-'t'S, DqI=-T vF.r~T_!~/:.~L su3 DRI.F_T TOTAL COORDINATE._S ..................
__D::?_T~!. "~' '-.
_._ A '.:,:,~' ....... PEP.TH ............ Si::. _A_ ...... 0 ! ,?, ~:~ ................
,.') M DEG. D M S
~ ,,.~.,.- ..........................................................................
('. C 0 0.<)0 -1C5,00 ;,:13. OOE O,OO S
~ ,':.') .... O _.4.5 ........99.,?_')_ ...... .,..5__,.qO ....... .N._i._3._O0~_ ......... ._0_.._63 t~,.
2j.:i:: ........ 0 4. b lq:~.98; ....... g4..eS, Nl_l. OO:.v 1.93~ N
3r,,,'" I 0 2oc.o'7. , ... 194o97 ,-.lO.0": . ,..,
4~0 1 30 399.95 29~.,95 ,N 1.00[:~ 5,,55 N
--f-,' F% ............. .' ". .............. .i'".- - ....... , ', .
., 0,,.. ? i5 4~°. · Pc? .39z,. ~
v~e .... ,., ':~- ~:5-~.--4~ ..... .~9-<;-.P:~ ..... :,:51 ·
......... . .................
~ 10 799, ] 4 '-,'%9/~. 14 I'.:z~=,.
9Oo--s 0 89[;.~:/'a.' 793],-7'z,7 ...... F: 4 7-. 0 0;'.' 29,24 N 22,74 W
0,0¢ W 0,00 $ 0 0 0 W 0,000 3,00
0,14 E 0,65 N 12 59 59 E 0.750
0,16 F_' 1,94 N ~ 0 47 ~ 0.~12 1,07
0,22 W 3.41 N 3 46 27 W 0,250 2,29
0,56 W 5.58 N 5 48 12 W 0,500
1,40 '.'i ~,78 N 9 I0 16 W 0,752 6,49
0(,'-" 12.72 N 4.6R ;:,'
,,,~', 17.44. N 10,11 W
CO'/..~ 23,08 N 16.~7 ".'.'
13.56 N 20 12 3 W i,D02 11.58
2o.16 N 3O .~ 3'~ w 0.7,50 ~,~,,..Ta
2'~-;2~ N 35 20 ~'5 W 0.672 27,~7 .....
37,04 N-37 52 51 W 0.171
llr'O,. A. :r.,.... 1097.77 092.77. ,."31.'''''w.,,.. · 44..31 N
1 "¢''' , , ' '-' .'.r ¢~ ....
.,:.,~,, 7 30 ll°7,.J~' _~t)9,~. .. 22.00,' 55.01
.... ".~..' _' _ ".' ...... '-, ........ ~ .... "'_ .'., .... 9 ". h.: _ 0_0'.',' 68 · 28 )",:
;.,.)0 ..,~ .. 1.-9.,,J6 ].]. 0.. 5 37. _
'z,n~ '].2 0 1594.01 ]..'_ ~c · ~l hz*l
, ' ", ......... ~; ~'." 83,16 N
29,20 !'.'
35,29 W
46.29 N 39 6 25 W 0.673
55.65 N 38 32 18 W 0,592
~.0,63 V.. 6B.39
48.14 W 63,54 N
50.19 ";,, i02.66
N 36 26 55 W 1.259
35 il i W 2.631
N 35 53 4.3 .W 1.918
35,99
~5,20
. .
55.20
06,03
80.16
",--'Lr~,'1, O 13 1=, 14al.59 ].3~6.'q-g x'41.O(J'~'.' 99.66
· __' ...........'.' ........ c .... ' ..................... '" _ _ .' _ l ...........
!/-,cO l~ 0 15hR.56 l~-E3,56 .N ~ 2 · O'C'.',' Ii7.94
!7')C 16 30 ].554.~0 1579,:-:0
l'~C:0 19 30 1779,90 i~74,90
2040 16 50 2007,49 1902.~49 L41.O0','~
........
?100 17 30 2064,~{2 1959,82
- -- -
2200 17 45 2160,12 2055,12 ~.:41,OOv.
74.53 ',,./ 124.45 N 36 47 26 W 1.250
90,70 W 148,78 N 37 33 43 W 1,751
139.34 h; 105,59 W 175,88 N 38 7 51W 1,505
162.10 N 12-~.35 W 206.75 N 38' 22 22 W 3.009
187,90 N 148.$7 W 239,73 N 38 23 25 W 0,5il
2].2.06 N 16~.79 W 271,04 N 38 31 6 W 1,524
220,97 N 17'6,54 W 282,84 N 38 37 19 W 1,650
Z34,34 N _188,16 W 300,53 N 38 45 43 W 1.100
257.i9 N 209,02 W 330.79 N 38 58 0 W 0,250
201.32
Z'~"~ '. 4 .~
.......
Z7~,67
293.06
~22,84
2300 17 30__2255,43 2150,43 ..... N~O,DOW
280.13 ~.' 227,79 W 361,06 N 39 6 59 W 0,254
352,59
RECO?,L) OF SURVEY
ALL I
C OHPU T E P,
DOG bEG
:'.',CAF, D;':'IFT \/EkTICAL SU!~ DRIFT
.C, F ;:: T ;i A""G L F DEPTH SEA DIREC
.....
.'
TOTAL COOAD[F[ATE5
C L 0 S U R E S SEVF,.RITY
DISTANCE ANGLE DEG/iOOFT
--o-i"3-fA-,~[c L
25C() I~. 15__2445.84 2:~4.0.$~.__.N39.50v;__327.17
_25Q-L..].F '~:) 254,0.74 2435.74' N39.50'w 351.4.9 N
' C u_:g.~__4 1__2 63,_5_..49___2_5.3.0 o. Ag___~x.~ .4 0 ,.0_ 0 t'~_ _5__76., D B
~G --.') .3 10 0 2730.10 2(;25,10 N3q · b G".'/ 40i~07 ,~.'
200q 1 ~ _..23__2_8.273.~!2..__2..7i_.~_,_8.2 . .~'J~_9..._5___OW_____._4.2_%..._g3
" 0 · 0 ri ' /%1 '
~t~fi,~' 1[~ 0 2. 19.82 2o14.~:.2 ~,.]g.:.:O',', ':,50.00 N.
'~.].00 I'" a'! 3014.97 2909.a7 N/-~O.OOW 4'I'~.63 -N
-.
33r'~ Ir, 4,5 S205.~,3 3100.P, 3 N41.O0'.-', ":ln.91 N
--AQ-,¥~.. ............... &-; ..... ~, ~----;,, .....%: x---'-,b .... H'. 7: ~ ..... ET.,.- ': .,.
.,+.,-., l& 4.7 ~..,01..:,: ~,196. :~: .~aO....u,~' :~ .0.77
247.25 W 391.33 i'~ 39 1i 5 W
255.91W 422.23 N 39 12 28 W
286.96 W 45~.76 N 39 i3 41W
307,__4! W ~_~_.._23 ....N_3_915__4~__W
3g~.Oi W 51B.12 N 39 15 38 W
0,267
0.500
0.250
0.226
348,29 W 550.1~ N 39 16 32 W 0.602
368.16 W 58!..._.~2_/3__~_9__!__7___16 W O.z+O0
387.82: W 612.15 N 39 18 39 W 0,205
407.51 W 64,2.~7 N 39 22 1 W 0.313
426,82 W 671.90 :'q 39 26 19 W 0.750
445,66 W 700~-7'-5 ;t 39 29 33 W 0.065
'~q.~,, 16 0 3397.51 3292.51 ],.00'.'.' 582.15 /-64.09 W 723 9~ ;,~ 39 32 28 W 0.801
382 · Z ::
....
,~43 · 30
_'~.7.,:+_. 5 e.
505.25
..........
537.u1
.......
~98 · 24
..........
627.99
.....
685 .-29
55,';0 15 0 3,"-93.R7 338:°.,.F:7 %~+1.007,' 5F.~2.SB N z+81.6B W 755.70 N 39 35 34 W 1.000
?,TJ~ !5 0 3590.46 3z~SS.Z~6 ?~42.0(';-.'; 601.72 N a98.78 W 78i.56 N 39 39 21 W 0.259
3~53:) 15 0 3687.(35 ~582.C5 N&2.O05',: 620.95 N
0 3f~'3'-?~5 ~678.65 N40-. 50e¢ 640,41 N
..........................
15 SilgO. 18 3775. ].~ ;X4-,2 · O 07~ 660.05 N
.....
LOO.O""
~'.; 680,54 N
.3900
"' r', r',
4iOD 16 17 3976.42 3871,42
__4.2_0 O_Z.7__ .0.___4,¢_7_2... 2.2 ..... :59.0.?_,...£._g ._ ~',: 42,
'..3.00 17 30 4167.72 4052,72 ..... :4,..n..O('~.,.,
- (...,. ~,
r.,.2 08 N
724,38 N
73c;.~0
'764,. 78
516,09 W 8C7.43 N 39 43
533,16 W 8~.30 ~'-i 39 46 42 W 0,388 8-1~ 7"7 ---
550,36 F' 859.38 N 39 49 22 W 0.271 8~1,44
568.20 W 880.56 N 39 51 32 W 1.062 8be.17
. .
~87,09 W 915.20
...........
606.64 W 044.85 N 39 56 41W' 0,549 925.53
45(,'0 I~ 45 4z~52.70
4-'fCC I¢2 z, 5 454.7.39
ri. SO0 19 4'1 z,.6Z,.l.78
Zi~-C,O 20 4.5 4735.58
A157.g6 "~;m. OOd 748.23 h'. 675,61 V: 97=
..... ,.32 N 39 53 59 W 0.976 955.22
4252,93 ?;59.0CL~ 772,91 P~ 644.~9 ~'; 1006.62 N 39 50 26 W 0.539 985.67
43z, 7,7C ~.,38.30:', 797.90 N 664.77 W 1038.55 N 39 47 58 W 0.271 lof~"'Tg--'
/+4.42.39 ;,~39.0u.~' 823,23 N 68a.56 W 107G.67 ;'4 3'9'44 43 W O.OOO luaS.o3
4536,'-9'8- ....../3"~%-0-0'w 8~9.24 N '/0z~.89 W i103.67 N 39 41 35 W 1.050 1080~-i2-"
z, 63o~5~ .... ~-3-'8.00:,'; 876.55 N 726.22 W 1138.3i N 39 38 30 W 0.950 11i3~-~ ....
._
500C 21 15 4828,94
5!~0 21 47 4921.97
5200 21 15 501~.99
4723.94 N37.OOW 904.98 N 748,04 W 1174.12 N 39 34 34 W 0.517
._
4816.97 NS$.50W 934.38 N 769.99 W 1210.77 N 39 29 26 W
4909.99 I'(35.50W 964.06 N 791.55 W 1247.39 N 39 23 i'? W 0.565
r~ECORD OF SURVEY
,,.. . , ,. iD , ~'
ALL ,..ALCoL/.~TION5 Ei,~FOR;"ED BY i i~ ~'~ [~LECTRO;.:~C CO"iPUTgR
TRLJE DOG LEG
",i F;\~- DRIFT VERTICAL SL!B
........................................... . ......... u,', iFT
P :'--'P TH A.'.'!: ~ ~_~ .... _D. E_P_.T_H_ ..... $_~. ............
D ,~.i DEG.
TOTAL CC)ORDiRATE5 C L 0 $ .U R E S SEVIiR[TY SECTION
DISTANCE ANGL~ D~G/iOOFT DISTANCE
__.s!_c~o_2.~_ P___.=.2.9_2..,_:g_'! .... 5_1_a.7.,171 ..... '::~.7_;oo¥,; lO55.9z
'.,~0 24 45 5383.25 527,~'!.25 N39.50~,? 1088.33
'-~..7,"~0 24 ~' 5474.2~-~. 6369.2~ ,'-,J44.00W 1119.2,9
. .ftF;O~Q_24.. ..... 0 __5.16_5.. _fi9 ....... 5._4_6.0_,_ f~_9_ ....... .%_'..~?_. 0 (;~,; 1147.27
__5~2._C.',_0 .... 2~, 30 %(;~7.12 5~52.12 i'g,'+9.~''' it7'~ 56
_. . .,. . ,..~ v;,i ..~ #
60C0 24
8.r..'~5.73 ',,\'
9i3,,28 W
94.2. ~6 W
973.~ W
C 57~c;.65 ~643.65 ,~:51.50W 1199,18 ~,~ 1004.45 W
1283.78 N 39 i7 ~6 W 0,321
~..
1321.86 N 39 13 58 :,:! i.~00
1361.94 N 39 10 1 W 0.700
1403.21 N .39 8 24 W 0,869
i444.54 N .39 12 53 tV 0.963
148~'~.00 N B9 24 5i W 0.~41
1524,70 N .39 40 22 W 0,506
i564.27 N ::39 56 59 W 0.600
1254.ga
1330.25
1370.4i
i ~i i e_ i~___
1~.1.8i._.
1492.0~
lbB2e3.2
6!09 23 15 5.¥~40.27 ~735.27 N57.00W 1222.58 ~< 1G36.96 ~,,,
__f,_2_,?_0__25.._ O ..... ~931.53._ t826,53 N61,OOW 1243.63 ;~ 107i.99 ',?
6300 2a 1~ 402Z.~.i 59i7.41 N70.OOW 1260.9~ N 1109.90
,')400 24 ~ r~i]3.~.6 6008,66 N75.00W 1273-21 '~ 1148.91
..........................................................................
~5(}0 23 0 42"5.37 6]00.37 ~:76.50W 1203.02. x, 11~7.55 ~,,'
.............................................................................................
.......................
6700 22 5C 63~0.~V &285.17 ,N76.OOW i300.7~ N !26i.93 W
.......................................................
6~()0 22 30 6z+~Z.56 o777,5b N77.00~ 1309.64 N 1299.14 W
..................................................................................
7000 22 17 6(,AT.Ta &5. x,24 r.:74 OOW I328.g-& N 1~73.47 W
...................................................
7100 22 "= 9' . ......... ~, .= ..... -~ -. ..... -__
.............. ~.... ..... 67.5 .77_._f~654.77 ~.7:~..O_Q?~ ~..~__~.9~ ~' 140q.~,.
"2:9<D~.2~D %~3~_~3_ 63J7.33 ................ ~'.~75.00W._ 1348.79 ~: 14~4.57
,~, , ,
74C0 21 a5 7037.67 (-~932.63 ~'~71.00W 1358.~9 ~,= 15i9.07
1603.12 N 40 18 13 W 1.1~9
1641.88 N 40 45 3~ W 1,890
1679.81 N 41 2i. 19 W ' !.677
1714.95,~"' 42 3 4~ W 0.880
'i74~.27 N 42 47 i3 W i.0-26
1780.27 ,N 43 2'8-"Z~0 W 0.803
i812.27 N 44 7 59 W
.__.
1844.71 N 44 46 i0 W
__.
1~7'7.62 N 45 22 56 W
1911.10 N 45 56 4, W
--1944.48 N 46 28 ~6 W
1977.83 N 47 0 12 W
2011.~0 N 47 3~ ~g W
_
2044.P6 N 47 58 36 I ~
'?~,or) 2i 30 .713[).,":0 '/C25.&O ,":'/2
i8i2.8~
i65:4.29
1A.~__1 · 4 s
1 '7 Z '? · 8
:762.b3
..,.
1379.97 ,"" 1554.22 !'/ 2()'/6.45 K 4,9; 23
0.334 !797. iV
0,383
0,336 !~.!66,75
0.499 1'~01
0.152 1~36.86
0.000 i9.7i.60
0.050
.........
O. 527
..................................................
~4 ~,.' O.ZS* 20'/
7.GOC, 21 15 7223.72. 71i~.72
7700 2]. 10 7316.94 7211.94
7~'}r.;Zl ~O 7z,.10.19 73~5.i9 ?,~73.0~W
79(;3 21 IC' 75C3.45 '739~,.45 N72.00V.:
BOOO 21 5 7596.72 7491.72 N71.OOW
........
~lOO 2i 5 7690.02 7585.02 N69.00W
2i11.77. N ~ 48 8 w
1401.2i i',! 1.623.(:7 ?,' 2144.69 N 49 12 22 W
0.282 · 2i09.~4
0.153. 21a£.89
fi'=f6-;-~-,)'-
.. ~o W 2177.66 N 49 35 49 W 0.361
1411.47 h 1 S5F .,,.. -
1422.33 ~, 1692.74 W 2210.97 N 49 57 40 W 0.361
__ _
1433.76 N 1726.92 W 2244 54 N 50 17 56 W 0.152 2""-: .... w'
1446.07 N 1760.73 W 2278.44 N 50 36 14 W 0.720 227g.13
........................... 8 L.._L.___CAL_~U_.L_;~_T.. ~_C ;_'! ..~. ,~ . .......
SU:,V,.';Y
i ~3 NJ. F-LPiCTRONiC CO~'-,;PUTER
:. ~"" DRIFT VERTICAL Sbq Dr-'. t FT
__ L..--.. '.__.., · ...................................... . ...................
,.,"'"i--]!:TM ANGLE DEPTH ,c::"A. D I P. [-"C
DOG LEG
.TOTAL CCORDi?.~ATES C L 0 $ U R E S SEVERITY
DISTANCE A'i",i O L i~ DEG/iOOFT
0 M S
SEQ T I
D[STANCr
7200 .2; ............... :'~{':'- ~'-'' ....... - 35 N~7.OOW i4.59,,52 ?; 1794.03 ',,: ... ......
'~300 21 0 787..:,.71 777!,71 N65.00W 't4.74',i0 ;'; 1.12.%.76 V..' 234-7.35 ;',! 51
_.~/,..O_C~.2.0_3.r,.-'_ .... 7970.22_._ '71: 6 5. .. 2_~.;., _ .N 6 3. ...07~!; =]~.__z_L.8~_..__6_.3.__;~ .... i_.~5_~,L,~L! V,:
0') 20 ¢;,'-'06/,, .. .[;4 'laSg.O6, N61.OOW 1505.8~ .',.I. lo.,,,.16 ~,,!. 24.15.9i
"'t~60(~ 13._l..5_2',:..i.5_~'._.._;'3_~_~:!p%.}_,2.3__D~6_(')_;._'Q,_'.gw 1522.41 ;,: 1918.40 W- 2;+49.08 N 51 .33 ~3 W 0.7~
("). 272
2312.'b7' -
.
~ ,+ '/ . ,'. ;'
· _
....
2'-,19.90
.....
.......
2 ~+ ~,,~ 1 · 53
..............
...............
i9a5.62 W 248i.53 N 5i 4.0 9 W 0,272
1971.68 W 29~O.53 N 5~ ~5 I~ W 4.000
1992.91 W 2535.~2 N 5i ~8 97 W 1,007
20].2,67 W 2~56,88 N 5].
2031.4.9 W 2581.53 N
,'!700 19 0 ~ 7' ui/+7.71 :',~59.00W 1539.O4
~_ .... . ....... .. _Z _., ,. · ~. - ..... :.. _ ...................................... ·
- ~
~00 15 C ~':l,~.~:.j t2z, 3.3:5 N5~,OOW 1554.1u N
~-_~ .................. "~ .. _ "l ............' _., .......................... .
~OOO 14 r) q/.',5.1z, t~34. C'.14 N57.00'X 1567.37 N
~1_~.0__13 .... 1.5 ...... 9542 · 32 .... [.~.4.]_~_l_~2_...:_t~9.7_._0_/J_~%'___~_5_8.0_. !J)'"t.~ ~_1 49' W 0.790
.
. ,; "C3q 71 ~353&. 71 N55.OOW 1592.b9
........................................................................
~(}0 ~ .... ' 20~9.5~. W 2603.87 N 51 55 4 ~ O.1B8
12 ,,., ~737. ;-:% ~:(,32.1~ N53.00W 1606.0~
.................. ~ ........... .~ .-, ~ .
9300 12 25 ~f~34.'/6 8729.76 N52.00W 1619.35.
...........................................................
9400 11 20 ~{932.6! fiP27.bl NSi.OOW 1632.17 :',: 2082.05 W 26~6.3~ N 5i 55 10 W 1.091
........
2625,69
26~6.28
95r'9., . 10 3'D eO3.~.. . "'...'~;," ,~92~ ,. 80.. .'",:50.00",'.'. . l&44.2P, _ N 2'*n7~;,' .67 VI 2665.27 N 51 54. 34. W 0.841
266-5.22
9600 10 9 9120.2] g024,21 N48.OOW i655.d-9 ~','. 2111,10 W 2663,04 N 51 53 24 w 0.504
~ ~122.72 ,h~6. OOW 1667.59 " 21°''
.,9790. g ~5 n22'Z.'7,' ..... r ...................................................... ". e ....... :.64 k 2700.13 N 51 51 ~ W 0.256
9SO0 9 15 g32~.35 g221.35 N~5.OUW 1679.16 ',1 2i35.~1 W 2716,5~ N 51 ~9 14 W 0.501
..........
__.
2700.09
2716.50
oqO0 o 0 94.25.(:,e 9320.09 N4,4.00W i690.4.7
' '"" N
_,_,~ d a 0 8 50 q523. i:' 941~.Pn 4.3.P 1701.72
--- . ......... .. '- ~ ..... - _ _. -1_,, - ...... - . _.'-'
':1OO 8 10 o62". ,..7a c~1'/.78.,... N42.5Ct,', 1712.5~
._
'?,~,~.200 7 .5.0__9721.80 9416.~0 N4.1.00W 1722.96
__b0_aS£, ..... 2_A.%__P_'7_7.._L._.%Z ..... e.6 <,~,.....~7 ........ N %9 .,.O~;:'L__.~_T_2_7_. ,) ~
1.0344 6 z+O 0864.6P 9759.68 i',36.8 OW 173~.9b
F~ 21z+&.53 ',,; 2732.26 N 51 z+6
..
:: 2157.20 W 2747.61 N 51 4.3
· '~ 2167.24 '.'! 27~.22 N. 5i q.'~
0.162
1W 0.$7u
..,',' 2~76,5i.. W 2775.~4.. N 51 38 3 W
,',) 21g0.73 W 2'/82.~7 N 51 36 25 W
F', 2i~37.73 W 2793.4.3 N 51 33 5 W
O.B31
1.182
0.018
2732.2~
2752.2i
2775.9B
27U2.3'/
--S'OF~:%-/.";-"~,'SLE CLOSU,q,~ 27'9-~-.'%-?-/E~-~ AT N .51 33 ~ ",¥
i.~.!T.E.~PGLA_-FE-D_-T.F;_U~_..VF:F.LT_I_¢AL-_..D~P;T_H.,S "R- ' "'-' ' ....... " ·
,-~ ;~,z_ ~,,~ r:'. ^ ~-., ~ r~ r.: r-, ' VERT iC6L '" '"
NAT.-",~ C L 0 L~ U ,~ E
_,-_~,_' ..... ".'_-.._;-,.,.,_,.,__;.,,..u ...... ,0 , AL COOR D I" "~'
;,: A..4~ ~..F.. P__T t_.I ................ L)_!.'?_T. _b... ..... D I 5 TANCE ANGLE
D ~/, S
...
SUB
5F..A
'.',-'.',~' ,,-",':" __DE~_Ti-,LA.~D OZJ-:IE_P,_L)_A_7.A., FOF< EVERY EVE,","
. _' L.,"% ~ ~. ,. ~._,,.d .....
10o
FEET OF SUB SEA DEPTH,
T R LI F..
,~.~E A SLJR ED VERTICAL
O~o'r~ DEPT~'i
~--.', Ill
VERT I CAL
¢ORRE¢T i
kji ~
TOTAL COORDINATES
2_.'_j~5 ., 2.o.%. _]. o.o .',;
3o~ ............ 3_0..5.: ......... 2.oo ............ o
40-~ 405 · 300
~05., :505. 400 0
no% Jb%. .¢'b~
.._70 4_ ...................... 7._0.5.: ........... 600 ............ o
r'06 80.5 700 1
· ~.. _.,. II ..
._ ,...,., ...., .......... _~ :_~_ ~.~' ............
_0_:,_.:.. ........... ,.' 0 .............. i
.~_.!_0 7 i i0.5 · 1000 ,._
0 Z.O0 N Ot15 E
0 3.~9 N 0.25 W
0 5.6a N 0.56 W
8.84 N 1.50
12.95 !'~ 4.92
0 17.72 N 10.~4 W
23.45 Fi 16.74 W
C 29.59 N 23.~.3 W
0 36.63 N 29.6~ W
i 44.97 N 35.69 W
__ 1.2.0.8.. ................. 120 5 .. ...... 1..10.0 ............ 3.
................... 13¢)0 .... 1305. ........ 1.2o0 ...... 4
1 55.99 N ~1.0~ W
1 69.5) N ~9.10 W
2 8~.90 N 61.70 W
I~1~
1617
172]
1932
2C37
2142
22~7
23~2
,....~wS.: '" - ....... ':i.-¢ CO .......... 12
] 705 · lTOC 16
I~,05. 1700 22
.i o05 · 1200 27
? 0 ~ n ....... 19'A'O ........ 32
...........
? i ,'~ ;~. 2 coo 3 7
..............................
2305. 2200 46
2 102.06 iN 76.62 W
121,24 i~ 93,66 ;;'
4 14~,01 N 112,49 W
16B,99 N 133,91 W
195,95 ;'4 155.25 ',';
'220,31 N
243.90 N 196.47 w
268.01N 217.35 W
292.20 N 237.82 W
2a57 2435. 2:-}00 92 6 316.93 N 258.27 W
25(:2 ............... 2.50F, .. 2./:00 ............ ~_7 ........... 5 342,32 N 279.18 W
__ 2.~fL8 2.,%,C!~_. ........ 2qO0. __62 5 368.2i N 300.66 W
'---,- 2_7.7_3 _2.7.0¢,. ....2600 .......... 558 6 394.26 N 322.46 W
2,°79 2.qO5, 2700 7t,. 6 /-,20,81 N 34~,00 b"
...................................................................................................................... : ...................................................................
.............. [ 20'r'./+ 2905 · Pc;O() 79 .5 446e 31 [',.' .36,:¢',, :'~2"
fog% ~'0-6".5, 2?o0 .......... -,~ 5 ,,7i.i'3 ;,: 385.,54 w
3194 3105. 3000 89 5 495,31N 406.3-1W
· ':. ,~'%' ']( .
32~c; .~,_0,,. 3].00 94 5 5la 69 N ~+26.63 W
3z~04 2.305. 3200 99 5 541.56 N z~46.33 W
.
3_%0.~ 34~, 3300_ ..... i_Q]. 4 563.78 N 465.50 W "
3(,12 3505. 3400 ].07 4 584.58 N 483.58 W '
.... · 221_5
3 604,60 N 501.37 W
0~: SLaS. SEA
3 ¢ .1. ~, 3705 · 3600
3922 3no5,. ~.700 117
t+_02...6 ................. 3 o '~ 5.0 ...... 3,? 0 ~ ........ 1.~ 0
4 ~39 4005 ,__3900 12~
VEldT ;[ CAL
C 0 l-;,.r'~ EC T I 0."'-,'.
TOTAL COORD iNATE5
· o 2. ~ · 53 N .51_9__t3_0 W
S ,b 44.7,5 N 5.3 6_ ._8__~...
3 655,12 ~ 554.91 W
4. 686,95 N 573,63 W
4_23_4 . ........ 43.95 · ........40?.0 ....... ]..Z.9
433_9 ..................... 420 5 · ....... 0,.1_00 ......
.... :,,,.,..~ , 42,.u ],, :'
4-55..'!. 44~5 · 4300 1 z:.4
.......................... · _ .......... --_ '_
z,.6.~ 5 4 ~o5 · ..... .~_~ c__,.O_ ........ l_'~.o
4761 4605, 4500 15:5
.. .
_- .................... r'~ / ~. ,
/+ '~ h_7 z, 7 ,,.:~_: ..... ~,_,~__0_0_. .......
4.97/L ................. /, a.O_5_., ..... ~ 7_0.0 ....... 169
50~_2 49_0~ · 4 ~ 00 176
........................................
5297 5105 · 5000 191
..................................................
5405 5,_2Q 5 · ~100 199
5514 ';=05 5"00 209
_- _. _' ..................... ~ · ........ ~-
5624 54~5, 5300 2i9
5731, hq05. ~.400 229
5~43 ~'505, 5500 238
5952 5735 · 5600 247
60~,2 f,~O5 ..... · b700 257
5171 5905, 5~0 265
---- ~ ..................
62R]. 60~5. .... 5cOO 276
................ '-) . ...........
~90 Oi05, 6oS0 285
S500 &2.~9 · 6100 295
671&
....
6824
69 '43
7'b-d-1
6305. ,:: 2CO 302
,~,z~0.5. {:,..CC. 3'-i
s ~i%". ..... ~;~ c e ......... ~-'~-'~
................
6705. 6600 336
7 929.00 N 765,86
~ 960.97 N 788,99
7 992.57 N U12.24
~ 102~J41 N' 837.19
lC 1060.47 N 863.62
_.
10 1096.0B N ~92,09
i0 1128.95 N 922.97 W
1i58,70 N 95-6.01 W
1187,09 N 989.25 W
i0 12i~,17 IN 1024,22
8 1237.59 N 1061.36
11 125~.10 N 1102,51
9 1272.i3 N 1144.97
10 1283.15 Fi 1187,36 W
7 1292.50 N 1227.86 W
9 1302,18 N 1267,88 W
~ 1311.75 N 1~08,09 W
_.
9 1322,08 N 1348.66 W
-
8 i333.07 N 13B8,39 W
7].4e 6605. 6700 344 8 i343.78 N 1427.86 W
7257 6905. 6800 352 ~ 135~.36 N 1~67,36 W
7~65 70~5, 6900 360 8 i365,14 N 1506,53 W ·
· 7972 71n5. 7000 367 7 1576.82 N 1544,44 W
_FA_SL!:°,'-iL) D.~P_TM ;,,r -' ;4; :~ _.E-'_^T
EVEN lOP, FEET CF SUG SE.A D=PTH,
V[5'2 1' I (]AL
._~_¢ P T ri
...... . D-TvD
5;L&._!J.I..F F E R a i'; C ~
__.Y. 5_LLO 7j,"./.LS_, T_LO.e 3 75
760 7 ....................... 7.3.0.5.., .....7_2 O0 .......
779t~ · 7~(15. 730('1 389
VEP. T I CAL
' CORRECT I O,'q
TOTAL CO0.RDINAT, gS, ,.
1388,79. N 1582,0i W
7 i309.91 BI 1619.1D W
7 1410,83 N 1650,22 W
7002 7505, 7400 397
1422.51N 1693.31W
80OC 7605 . 7500 4.04.
~ll& '7705. 7~'"0 ~11
'~29~- 7!~05. 7700 4i~
: 1_ .~ c...,. , ........ ~
fi 3 ~ n ................. 7~P_~.__3 ~ 00 ...... ~+ 2_5
......................
55~.n 9105. 8000 439
7 1434,81 N 1729.94
7 i448.!5 N 1766,10 W
'7 i462.77 N, I$01.60 W
7 1478,68 N 1836,45 W
7 14%';5,56 N 1,970,06 W
7 i513,09 N 1902.06 W
5 1530,53 N 1932.31 W
6 1547,74 N 1961,10 W
4 1561,89 N 1904,35 W
,"..'._o 6.2 ................. ;: 5.o_~.'~ · ..... _..~h:_..n_ 9 ......
9064 8605. 8500 4~9
') '1..":,-7 .................... '.!-7 05-' ..... -~.i'6 O' d ..... -4-6 2
3 i575,35 N 2005.21 W
1588.27 N 2024.81 W
1601,64 N 2043,68 W
161~,23 N 2061,6,3 W
92/%0 ,9 ~ () 5 · 87(:0 464
937~ ~a05, 8n
.... , .... ,, 467
.................... ...... 17i0-6 ......
.3 i628.6~ .N 2078.67 W
2 .. 16z+1.12 N 2093,96 W
.. 1 1652.98 N 2107.~4 W
..
c) ....................... 677 9-2'0'5 ',' -- '-0-1- 0-0 ....-472
9778 a '.a '.'.) 5 , 9200 473
2 1664.83 N 2120,81 W
i 1676,65 N 2132.89 ;'.'
2 i68~t,18 N 2144,31 W
1 i6-99.56 N 2155.19 W
i 1710.'70 N 2165.46 W
g880 9405 · g3CO 475
9c, r~ 1 "5. ........
~ 9500 477
10082 96,.~ ~ ·
10123 97C5. 9600 478 1 i72i,25 N 2174,92, W
!_Q.2r~4 9805. ...... _9_7_Q.0. 479 i 17~1,29 N 2183,.~5 W
-t-~-~T-E-;~-P- 0 L,- A-T-c-.D--V~66i-,~-.--F'--C~ ~-~-~V-F~ ,- 1060 _'_.F_Z,'-:'_T__QF' i¥;.2.AS U.:~F-D--D~ P T H:
....... ~-i"--: ......................
D_~½" T H. pif. PTH 56_A 'tOTAL COO;~,[) l I~,A Ti-' 5
2. D__0.0__ 1._~_6_ 9.. .......... 1 p. 6 z' ·
3_00_0 2P_1.9_._~27._] z:.
__4_0.0.0 ......... ~_~ ...':-..0_.. .......... ~. 77. 5,
.~_0__,,_0 4 ~ 2 a.' · 4 72 3 ·
5_0.0D ~ ? 4 t;.. ~.6_5.:%.
e 0_C ':) ...................... 7..5 9_ 6.. .......... .7.z: 91 ...
;._ .z.J.L~/ ................
1.s:o. 0_0 ................ .9_ 5_~_~__., ...... ?his ·
212.06.':'"" 15~.79 W
660.i0 N 550.28 W
904.98 N 74B,04 W
1199.z, 5 ','
. :. 1004.22 W
1329.02" i~7~..
,~ ' 4I W
!..~33.75 :'-~ 1726.91 W
kS._8_O_,_M9 F: 2012,67 ',"
1701.71 N g157,20 W '
......... _ ...... - .. ......... ; ..... ; .. ,. .....
........ ". ....... ' ..... ) .......... SCALE 1"=500'; ii' 7' ..iTl I~i-.':-.:'~.i.' i':~.~7, i ''7-';11'
........ ; ............ -'i--i ........... ; ..... ! ' AMOCO PRODUCTION-COMPANY ' '
.... i ..................... i ........... ~ ' ' G.E 18742 WELL 26 ........
..... ; ....... RA Di [J s "OF'-C'O'RgATO'RE~ .........
" ~ t ..............: .....
I
, . i ' ' ' GYROSCOPIC SURVEY
,, .... -.-:'-, "- !' .'..--..- -: :,-:
.... , · ' ......... ;:: :; L: ' -'_'. -. .- . : ; l_' ........ -, .............
t .................. !
.... :" ........ : .................... ............................ ...................... ................... ............................. '
.
" '' . ............... ' : ~ ' ; · m .....
..... ',. ............ . . ' .............. , , ' ......... , i":ii:
~ .... i ............................... { .... . ...... ;"~ .................. I ................ ; ................... :, . . '"
. · ' , ............... .. .................... ~ .......................... , .................., .........................
' ' '~' ' TVD= 9;865", .... ;. .......... : ! ..... - ............ i"';' ................................. i .:i.":":,:':"."i i ';
"' [ "i'"'. ....... TMD"~io:344 ..... i.".;"..~-.:i..:~,:.'il ".~';'7",-.'; 'i!.~'.~'' ;':;, i, '[.~;,7_i'~.':i"-.';..: ...... , ......... : ............. j · i j .....................
· ' ' ,' , ,.,! .................................. L ...... '_ .......... [............... J' .............. [ ..... ALL'..DEP THs.._
I
' ' ' II~, ...... : ..... ~ ............. ~' ' ' : .......... ~ ..... ~ ..... R '': "' --'".'-:-""i ........... .".;".'~'*~.7.".'" ARE
TVD ............
80OO' ~ : ' ; . · . ' , . ' : ' ....
· . · ' .! ,7600 ; : ~ ~. i . :
.......... ~ ...... .. ............. : .................... , ........... ; ......... , ................... .[-.-: .....
....... ~~ :.. .............. r ...... · ...... , ......... , ........, ..................... -t ~ ..........................
......... ~ ........... ~ ~6~I"~.I i ii m" ': i" i~ III ...... "II ~ "i.:I" : ':i : I".II: : :.III Iml: I.I..:111. l.m' ' Ii'I .......
'.. . :'..'...'::'.'..- ".'.i.:.: ..Z'::.::'i:::L. '..:-:::.':i::'- :...:':::":.'. "::':.:': ..'":.":::.:'i.":".'..:..:.:....'.:.:'..:.':' ..' .... 'i. 4ooo . ' .: ''i : .... " '..". ..' '. !. '-' '.'." :":..:'.':':'
' ' t ' ~ ~ " ~ 3600 : : I ............... ' ............ ) .....
2800
' ~ 2400' 4 ' . i t , ; ,
::::::::::::::::::::::::::: . ........ ,, ............................................. , ~ ......... ,. aooo .................. , ..................... ! .......................... . ...................
'7--~'
.................. ~ ....... .: ......... . ............. i ............. ~ ......... ; ...... : .................... ' .' .........: ........................... '...f .......... : ....... ! ........................ I .......
' .'. "..'...-i':" :': ..... :.. I ............... ' ................... i .................. ! .............. : ................................. =~ ................. : ........ : ................ : ............ =,...-' ................ '...' .....
..... i.'. ...... i ............ ........... . ........... i! ..... .... I'1{ .... ::.:.:Z:"l:':'.:...':...:~7 :" i": ............... I ...... : ...... 3 ................. i .......... ! ....... .'. ............... ! ........... ' .... [ ............ : .... ~ .............. . ...... i ....
...................................................... r ..................... ;' .......................................... ]--.,~? .......... ~ .................................. ~, ............................................. '-,, ~, ...................
; : . { : ~ / ,, . ~ r ) . ; ; ,
................ ; ............. ,. ................. . .................. J~ ...... . ................. ~ ............. ~ ....... . ........... { ........................ { ......
,.. ~ . . , , : · ~ , . } ~ , ~ ,
. ; . ~ · ' ' ) . t '. ; - : . I : I ~ ' t
( .... I' ' I' I ' : II III:' I'[i'" iiii Ii II IIiiI : 'I: :,ii I i . I' I : ~ I I 'I I t ' I I: ..... { .............. ~ ........... , ....... i .... ' ........ ~ ........... ~ .... : ............
._' ...... :, ................... ' ....... VERTICAL_ .SECTION
· ' ........... : ' ; ......... ; 'SCALE1
; , _ ............ - ..... . ; ............... .,...- - ....... ~. ......................... , : ...........
................. ~ ......... - ..... I ..... AMOCO PRODUCTION COMPANY .......... '~--' -
.......... : G.P. 18742 WELL Z6-'~ ............ ; .......... ' ! ........
! ............. . ............... GYROSCbPIC SURVEY. ! ......... : ..... ' .-i .........
" : i .. .L .......... ! ....
..
......... ,.,
......
....... r · ..... ' ~ ' ' .............................. :-". ........................... ;'--'"' .............................. i ..........
........ ' .......................... ...... .~' .... ' ----~-' ~-~:)0 ..... "j ........................................... ,i .................................. I, ..... ............ '. .............. .,.~ .. .....
~ . ~ . : . . ............ { ...........
' '" :'""'?" '"'": :: ~ ;80o ........... ........ :..: .......... t . ·
· -- .52( ......................... ", ..................... ~ ..................... '; ...... . ................ ~ ...........
....... ~ ' , ~ '._ .,..:.v--;' ...... I .
..... "' ....... " ! ALL DEPTHS. SHOWN.'.'-" '
......... ARE TVD .... ~ ...........
· "' .................. ; ................. t ........ :' ......
. . '; . 6400 ~ · · '
...... ; .................. .'- ........................... .-"7
8800.
~ ......... : ........ ; ...... t ........ i ..... ' ......... I .......... I ...........
· i :. . I.. ~z°o. .: ....... l ...................... i.-.~ ........... :..i ......... ! ...... ; ....... r-" "
~ I , ,| . '.i ...... i .... ~ .... '...
.. , . , , ] , .....t .................... ,'..'..L'._'.....;...C ......
'. - 'i' :.'"- ...... !-' ......... i' ."; ....... ~,'~o~-; ..... .-["'-::-:-"'.--:':7:':': .Y: I' :.; .... I..
.' ,. ...... , ., t--, .... '~- ....... I ......i ........ 1 '
.i. : i" l.. ...... iI . .' i':"! .
' ' 1 : ! ' . . , .. . t ............................. : .................. · ..........
.... ' ............... -i .................. ~ ................ i .................... ~ ......... TMO=IO~44 t ' , ~ . ,
: ' I '~ ' ' f '" : ' ': ' ' ' ' ; ' ' ' " "'" '
.'. ~', -,. t . ~ ......... I : ...... ", ..... : '} ...... " "' t ' " "' ' ' "
,,,,I,,,,rA~ 01¢1'._0 Y~CDUCTI0N CO.
:,,_ GRANIq'E PT. 187'~.2~¢26
,.i,I GRANITE PT. .
,,,,,y COC]f INLET s,,,,. ALASKA
C()ILE I.:\IR)R A'I'( )I{IE$, l~C.i"
l'.trotcu m R esrrvtn'r
DALLAS. TEXAS
Formation
c,,,,.~ ~T A~t~lD
Drilling Fluid
Elevation
l'-',g~ -% ,,r 2..
,:s,~_BP- '3-4! 5 ..
U:,l~ lt,l,,,r, 1/1
A,,-~b'.,,., WSP. RB .
Ct)ILI£ ,,\ N,\ 1,~ SIS ILESUI,'I'S
(l'i['urc,4 in p:trenlllt':,c,4 rcrcr lo I'n~fsmlt' rL'm;irl.~.)
,\MI'LE
I. UM lil';It
I)1]'1'11
I.' l.: El'
3
4
5'
6
7
8
9
10
1'1
12
13
14
15
16
17
18
19
2O
21
22
2-3
25
8471
8472
8473
8474
8~7'5
8476
8477
8478
8L,,79
848o
8482
8483
8484
848'5
8486
8487
8488
8489
8490
849i
8492
8494
8~95.
8496
Pl.: R M i.:A Ill LI'I'Y
MI LL! I)A It(:YS
Ih~rizontal J Ih.izontal
Maximum 90°
25 22
1ol 0.6
1.2
20 18'
i5 i4
32 27
39
112 32
18 14
24' 10,
2.1'
41 30
· 15 0.7
1/4.
30 i. 6
24 6.6
1.2 '
162
95
Vcrtkal
l'O It O SIT Y
!' E It C 1"I4 T
26 12.7
45 7.1
903 7;0'
17 14.7
--- 13o5
14 13o8
43 15.4
33 17.8
23 13.4
16 13.5
--- 1.5.6
9.6 14o 3
5..3 1"3.3
--- 14.7
--- 16.6
29 1,5.2
05 9~
8.4 1.5.9
19 1~.4
9..3:1 '2.2
13' .12,1
28 1.9,8
38 18.9
--- 14.,8
(;RAIN
i)I'?NSITY
Itl::;il~tlAl.
SA'I'I tlC.\TION
()il ' JTotal \Valor
l'ore J $'~' Pore
ILI:;MARK$
11,4
13.6
19.4
17.0
10o4
1.2ol
13.o
14.'5
14.6
16.o
12.0
11.2
13.2
12,2'
14.1'
1.2o6
14.9
9.9
1.1. 08
700
10.I
.9,8
10;4
13,.o
37,0
42,8
4.3..2
43°8
4o. 3
39.0
43° 5
42°4
43.9
49.1
41.2
42.9
49.6
42.1
48°2
37.7'
.47.5
.47.2'
L~5.4
~1.9.2
59°6
69'.3
~8,9
.53.3
ss;, f- cg,feb
ss,:F-mg,v p c, b
ss,m-¢g,sc Deb
.ss.,m-cg, sc: peb
ss,m-cg,peb
ss, f-cg, sc peb
ss,f-cg, sc peb
ss, f-cg, sc peb
ss, f- cg, s.c peb
· ss, f-cg,sc pe'b
ss,f-.cg,sc peb
ss, f-cg, sc peb
ss, f-mg
ss, f-vcg, p'eb
ss, f-rog
'ss, f-cg.
ss,vf=mg, slt .lam
ss, f-mg
ss, f-rog
ss, vf- cg, s'l.'h lam
ss,vf-cg, slty
ss, ;f'- c[.r.
..
ss, f-c.g
ss, m-vcg.peb
, ,
These analyses, opini(ms or InterprO. rations are based on observations and materials supplied by the client'tO whom. and for wh~ excl~ve and c~fident~l
uae, this re~ is mnde. ~2~(. interpolations or opini~ms exprea~d ~present O~e best' judgjnent of Core I.aboratories, Inc. (all e~m' and ~nissi~.s ex-
:optS); but Core ~)ra~ries, Inc., and its officers and employees, a~umc no rcslmnsil)ility and make no warranty or rvpr~ntatlcms. ~s to ~e pr~uc~vlty,
pro~r o~rat!on, or profi~ablene~ ~ any oil, gas.or other mineral well or ~nd in connec~ wi~ wh'ich ~ch rcrm~ is ~s~ Or rell~ u~n. .
C[)I[I!i I,,\IR)i{ .,\'I'01~ !1£S.
/'r trob'u m R e..,r.~., ir I'~.git~ecri.g
D A LLA S. 'I'EXA S
l-~)r nl:llioll__
o ,,,..,_ D I A~ON D
·
Page_ 2 of.
Fi,~_ BP- 3-41 5
l)rilli.g Fh, id
Elcvaticm
^,-"~r~,.~ WSt;, RB'
.ocaliOll,
Rem:,rks P£R.~SI~'¥ BI__.BO.YLES T,~_W
(X)ILE AN.,\I,'fSIS I~.ESLli,'I'$
(l"il:urc~ in i,are,lhe.,c~ rL:fcr fo f~)*.fn,~lt' rrnl:~rJ,k)
PI~It:dEA BILITY RI
' M i L LI I)A ItCYS S.& T
SAMPI.E DI'I'TI! ] ] I'O ROSll" Y ¢;R^IN
NUMBER I"l.l I.;T llorizontal liorizontal
Maximum 90° Vertical . I'EI~CENT DI'iNSI'I"~ Oil
' ' % P(;re
J'.$) DU ..\ 1.
SAT UR .,\'1 ION
I'l'.tal Water
.[ ',$ Pore
26.
.27
28
29
3o
31
32
33
34
35"
8497
8q98
10 8L',L!.
1o853
! 0854
lO855
10856'
10857
0sSs
42~
172:
0.0
6.6
'0.1
0,1
0.0'
0,1
0,1
O, 2:
25
90
0.0
0.0
2.3'
0.0
0.0
0,0
0.0
0'.'0
13.6
1.4 .,1.
1'.3
3.5
4.7
4.7
2,.7
6..7
4.2
4.2
9 1 I.i'v $
~2 0 ';S ,'
-- , . .... ·
22.6 65,7
3.1 68.9'
1.7 7K.O
12.4 71.1
11.7 7'0.2
18.8 66,0
13;o 63.0
fi;. 5 61.8
I{.I~MAR KS
, ,
sr.',, m-vcg, pet!
s ~:, n,.- vcg; pet:
sl. tst, shiy
se;, vfg, i'nbd
sa~.:e as above
sanle 8. S above
sa~6 &s above
. ss, vf-f~, inbd
same 8. s abov'e
s~u~e as above
s].ist & e.
s].tst ~.
sh
These analyms, opiniomms or Interpretations are based on observations an(.{ materials supplied by the client tn whrnn, and f(n' whoa: exch~'ive and confidential
use, this report is made. 'I33e interpretations or opinion.~ expr. es.~ed represent the best judp3nent of Core Laboratories, inc. (all errors and omlmissio~l.,} ex-
cepted); but Core Laboratories, Inc., And its o/fleers and employees, a.,,.'~ume no re.q)onsibility and make no warranty or representatio~ms, as to the I)r'oducUvity,
proper operation, or profiLablene~ of any oil, ga.5 or other mineral well or sand in eonneeLicm wiU~ which .,;uch relx)rt is used.or relied upon..
Amoco Priwluctio'n Company ,
SCOUT TICKET i."
S~ATE ANCHORAGE AREA
(.OUN fY
.. PARISH
BLOCK
SECTION TWP
COMP^NY AMOCO PRODUCTTON CO~'~A~Pf
SURVEY
RANGE
LEAS~ GP 18742
AFF NO. & T~E ....
LOCATION __
WaL NO. 26
FEET FROM LINE: N .............................. F ........................... ~j $ .................................. W
DATE SPUDDED
DATE COMPLETED I
PROPOSED DEPTH
ELEV __
__ IO~_.
PFS
CH
PF~
CH
CASING:.
OTHER
TP ~ GOR GTY
TP. GOR 'GTY
@~ ' WITH
-- @~ ' WITH
@ WITH
AREA
r IELD
E APl WELL NO.
·
Iw, 0 I"' 0
omo 0
jOT.E,I°"SET w, 0 01°'='s" "' 0
'7cc o1,-, o
PROPERIY
NO.
QTR ,.
MAP NO.
DATE
SAMPLE TOPS
FORMATION DEPTH
'FORMATION
REMARKS
ELECTRIC LOG TOPS
DEPTH
· OPERATOR PAN AM ,
,/
FLAC (~9730193, API ~50-133-20297.
10-18-76 Granite Point 18742 .Well No. 26 Inc. Granite PoinL Platform Anna, Leg 4,
Slot 8, 771' FNL, 713' FEL, Sec.. 12', Ti0N, R12W, S.M., .PDC Rig ttl. 52..
PBD 1970' RURT x prep to skid mud pmp sl(id, 10,500
, ·
Mud 8.3.
Trip 8-1/4, skid rig x RURT 57-3/4, ,-
OC date 1200 hrs, 10-15-76,. KB 105' MSL, suspended 7-15-67, PBD 1970'
, ~
13-3/8" 2022' 7-1.5-67
~ ,, ·
Rig 00'1200 hrs', 10-15-76, 'skid rig x RURT, trip,
O I'
1500
5'00
·
· -~'--':-" ....~ ~ , !~:C'~ '-- ' ' ' ' C--:'?
..,
IBVH~IIlIWE ' ~ CV~li4e BOHD AVBIVBFE DEH?.IIA
-. ~.~.o~ . ~o : . t.~ou, lo : !.,o.'u ~,o .. .
VAEB¥OE ]/,,,Err DBiI-I; S :S .........
I.]U!?p CDr ..... ! ' ' . ........................
....................... - .... ! .............................
2lOLl cdr ...... -t .... ·-.4-.-
............................................
........... :..
"'iSt~Tin'{G ............... i .........................
' 'En-,;',T~'!'G B '-'. ~,'5'J ~ ~-i'
.... t ........ ? ..........
......... /. . .. . ........
.. ~ ......... Uu,e COU~laul
.mai'~6;'.finib ~.~;n, ~ .i · ' .....
.......... r oaci~6~' ~b~:~,ci "0
................... :,- --:~ .... '., ...
...........
,, ,~ ,.. ~ ¥' --~. . .. ; - .
......
....... ~._ . ....... ~[ ...........
] - ' .... ; '1~60 lui~-'u~!~,x ...... ~"T -T'
i~Sal<qo.,~u 5,-'&~;-n~:~, ..... ~ ~ ... : ...................
-i .C~b JUl(;a?llX ........ :
· ' Caq' Oa!u ..... · ............
iin!q ' "'- z""i'" ' '; ..... 'i'b I~;^~i ;W;'~'~ ...........
'flavex ' - .... ;~-f .... .i .......... ~o. }~"..."'J"~i ..... '"""" : ....
..... ] .... %. -.
..... ~,, ~;. ,~. . - ......
B~muqe~ '-'[' ~o,lJO'l!'S,~i .,'x'br, ¢'EWC0 ' . .:.__ =
. . ....... ~. ...... ... . . .
.... · . ,._i ....... ~;; .
yqq,,,a~ .... .-: ' ' OS b.::6';'! '~o ?S0 ' '
· . _ ..... .__- .... ..' _ . . .:..? ......... . .
/',°lnme '~i c~',,eui .- ,v~-U~-baU~l 14o' I Fb° . ........
- . ........ ,: ......-._: .... ~ ~. - ........ ~-~- ......
CGU.~GUi . ~ ......... -i ........................... ' " ' ~ .....
D~bl.p_- ~ul~;di' .. ---'- ....... ~' ' ~ou,.c 2oua~ rio' J S I .~ ..... -, '
....... ; . ..: . : .... : -:- -~. -. ..~ .................
Dal, e . . 2ou,c COUl Ho' · ·
'-~;a;~,~-,g t,,.~,,L .... :: .... ":""'4" ........ ; "' . . e9.~ ............ -:. _
_-.~' ..... '" ... . .i .... 3.. 2bu<. L,nu;;: I)1~"' .. d_:. !" ..... "' " '
-. D~;b,p~ ," D~-~,,u~
CeU~.,.,ui bm~b:,~. -.?. ~-~---. ................. PPF' ,.u~!unl~. b!b~ ,¢.c!b,.~¢o. ic.,q ot4c, L bin8 .'lO,~u: ^~,~ .... "~,u:' 14..~ 'j~'"
b~ec~q'-u~ '~t'-qq'~..~' - W~I0' - ..... ^ainu's' ..... ~'i'-~ ....... PPi" b!b~' ~c!b~:olaq qnHu8 bn'mb!u~: )~,;"' .... '='-14o-r'~ ........
~"?, ¢~".~:'~~' ' .....-"I ~ i: 00 ,, ,, ...... "' '
:f;O~.{~.?~'7~'~i'i~.~.. ...-~ _!-: 00 ~'s\~.'.,x'se . ............. :~ ...............
i~(,laa~a ~te~:.:~L~ ....... .i ' '-0 ...... i ....
~c~[~,,q'bgi:~Ei68-~,.-,,,;~',~ ~ I · d0- ' 'l"S\Se\:e ' ' '.';" ...... :" '~ .....
.............
..............
'~;t" ~o~,, __ .q.,~. ~ 'o~ o,~,.~,~.~o,, c~*' co,o,, ~,'.!o,qf'a.]' i'.[i: ........
· .l_. . · ................
............ bi~ IW~'l~X C EWE i-111-14~" I~OC E DI~B E BEWYBK2
....
....... ~. ....
_.~..~, _...,. ..... .i~:,.;.. . ;:-:.. _.-~, ;~... ....: ..... . . -,,.:,., .... . ~. ~... g !.- . · .::
.
i ~ . ; . ~ ! ', ;
: : . ~ .- ~
· , .'3 . ~ I : ! ~.,'
;: ' . : ,' , ! : ~.-'.-.o'.~-.; .-',~ :
· _:. ; ' :,~ :
· . : i'~.J ~ ..-,- ..~,~
· . .
~ : : :~- _='. - .:~ '.~ .... ~._.
: - : . .'I/3; . ~--'- ' ..~ :-
· , _._--.~ --i!;--' ~ :~ ' ' <
i ' - :-,-,: _ ~ :, ; ~ j o.,
:---, - ' "- oio-!i~."'" '..'., --
~ ...... L~_: ...... · ~. '.---i.. ~ ~ - ;-t ~,, ·
· c_; · ,'~.,,. : - :4..-,! m ~ ~).-.
....-' ~.,~.: --,; : ".~. ! w '
O' : ! ..j ~ ]' , 't.I
I';~'; : - · · -4:
cz: ' ,= c.': = ....... -~--F-.-i--: i ~ :.-~ .
L_ ' x.~i i ': . ; ~ .~ ; 'c~ >
· 4'.o ~ F~:' , 7}:> . ' . . j-- ~ -.~
· - .._;_..~._:_ ....... ~n ! "~ ~ ,~ '"' : i '-~
· ! · ; ' - : :~3 I ;
, :0 ! i 'c: ' --~ : -,
: ~ ! ' .o_....~ ' ~ .r,J ~: u
, . ~ :~.: :oi"uhu,o- : ! o~ - ,'~ :..~ ,
:-~ .I.iJ : ! . 0 !
i '
": ; : '"' ' h~i ' : i I ~ ~ ~: ~:
..... .... -:> i ! >
·; : : · i :' ' ia.,;-,~.~ · '--~ ! ~- :c.~ ~ !~>
: - ~ i ~OQ.Q.,jQ, :.q ] ..<
·
; " :~' o!r,,;r,,:r,,',-;./ ;- ~" 6" !
' -' -~ -: · '~! ' - ' · l.-~o-c_~.'o:~!w i ~- -~ ~ '
· : I
: i · ' -, ~ : : : : : : ~ b U
.... i ! : · ' ' ; ' " 0
· : ' '---'-: --:' =-+ ~, ~ j I ~,, 9 u ~, u
:- [ .-,, i ' j COWbVH'I'VWOCO bBODRCIIOH C(
i ' ~:-' ~ ' =' ' --i-~ ~ '--se
".,.i~: ' · lB : ! J :'i
· : '*-. , nl MErF' UI~Vl4~IE boil4/
'~ic:, ,
'~-" ~ FOC¥110~'~'~'TI~'I4 I / E bO 114J.
· ~ e I'!~lq°~
. i>~!~:,~! I;-'~-~! ~n COI'IHIA' KEI4VI
OOT$
· .
·
.o.
, .
!! !..! !!!~ !~! ! [ ! ! ! ! ! !!!N ! ! ! ! ! ! [ !~.!!'! ! ! !..u_'!! I ! ! ~! ! ! ! i = i i i i i-i i i i i'l i"l i l i l.i i i i i i,i
t~g~;,~.,~ ,~gllI,Lllfll!,~llllfl..llilllllll TIN.~ll ! IIl.llll~,ll.il lllllll'.lllllltllll.~'lllllllllll ,l&lllllllll'lNllllllil, lllllll ll'llllll.ll[-.t',lIlllllll~Ililmllllll',l~
~..l I I~ I I II '! T'lll ~IN Ii I ! I I I I1N I Ii I:.l II I I I ~l I I I I N I I I ~l I'i N,I I ~ I I I I I I~ll I.I'l I I I I.I I i I I I I I I I~l I'I I I I I I IJ ~l Ii I'll J~l~ ~TIN i I ~ Iii.Ill I.I I'H ~..I..i".'l t I I I' I ~ 1 I;I ~I I I I I I I~ I I I I I In I I I Il
%11 fl I I II. I'll! FI It.~l I 11111 I~ I'l rtlJ i i~l I Illl I~.l.l"l I~llJ.~. i i i ~l'i I.I I I M'I I lllll Ill I N'I ! I I I I=l I I I I~l II I I'Vl ~,lll~ I I~ I ~N IZ~I'I I H'I'I II'~l ~l I"I:i I~ ti'l t.i-~l IlI=.,i 1111 ~l ITll I I I t Ill I Ill
I%l~lllrl I'l · I I ~l I I I I I I I I I~l ! I Iai I I~ I I I i 11 ii i i i"l I"Flllgt I I I I~l~~lllil l~ i i i i'! i~l~ la ~l F,iI~ i i'.l i'l i.i i i~l i.ii'l..i.l'l.i I i Ii.i i i i.l'~l~l i.Li i l.ll I~l ~l i iil~i~l tl..i i..i i ~.~t~
~ ,=l I ~'l I I' I I I.I I I I llll I. I I I I I I I I I I I I I I FI I/I I I I I I I I I I I I i I INI'I I I I I I I I I I I I I I I I I I t~i gl I I I I I I ~ I llll 'l..! I I I I I II'l'l :l 'l'~l"~l.l' I"l I'H l' I'l I ~ ~l-:l~ I~l I I I I I.! I~ il I i I I I'll I ! I I I ~Jll
Ill'llllll Illllllllllllllllll!llllilllllllllllllllillll~
, ...i. o= ' .. i,., ' 'l..'"' IF .... ..... .... - ...... .... "
, ,, , ', I ~ '" ~ ,, , i ' ' , ' ' '
.... ~ , ,, ,, .... , I.I.I lllTITFIIIilIIIIIIlIll FI I.I1N IIN~,..,..II
I~l ~l JJll I~l~mll I~lllll LJ'ILLa, -~II'lTl I'l I'l ' ' ' ' "' ' -'
.... , , , ~... _ . ~ :l'.l' I. I llilll Itl llll I:1 II, l,l',tllll:.l III.flail I,I I~ I.I(lJJ>~
~ I'I'I~.I:'FI'I~I i.I ti. Ii. ti I I I I I I ~ r' 1Tr[' 'l:l::l.l~ I I'l'l'l i'! I'l'l.l~ I'll'l//l:llIlllllltlllIl/lll'll.~l/l/l~lllll I"~I'mTH'I'
~!~ ~~~'~ ~ ll/I.II'Il' I'llllll.l'll.I Illllll~li~llllllllll~ll. lil.'lllllllllll.lll
IIlllllll Illlllllllllllllll!l ,~ Illl Illl Illllllll
. ~ ..Il, Il'/. ' _ ... I,I Ill:l'lllIqllll. l'll'll, llll, l~ll, ll, lll'lllll, ll, ll Ill'Ill'Ill
I l I~J'l I'111111.1'111 I...I I I I I I i I I.l.I I II.I I ! I I I:l I I I I I I I Illl I I I
Lll 1Lll Illllll I.Illllllllllll!'lllI'Illlll!.llll II I Illlllll
l I I. I. ill II. lll. I I Itllll. l.lllllllllll, lllllltllll. I II I Illllll'
l I I Illl. l'l.l, lllltlllll.lllllll'llIlllllllll, llllill II Ill lil, I l
L I I I I I I~l'l.I I I..I.I I IllIIlll'lfl. I Illlllllllll. lllll I I I Ill.I I~l.
I
Il I'l.I II III/I I'l I I I.'l I I I' I I II'l.ll'l'll'll I I I'l I I I I I Ill I I II II I Ill II Illl I Ill I I~' ' Ii-
I Illllll!l.l'lllllll I I/ll.l'l Ill'llllll'lll I I ! II Illlllllllllllll IIll-t Itll:l',,-II
II I" I'l I' I I:l lil'l I~lll I'l I I~l'l I'! i I'l'l'l I.I I I.I I I'l I I i'l.l.I I Ill I I I I It I I II I I Ii I./l I..I I.'l I I ill l
Ill~'llllll. ll.'lIlllll'lllllllll'lllll/'l'lll Illlllllllllllllllllllllll I Itlllllill'
II I Iil II tl I I I'1111 I'. ,, I I I I I'll I'l Ill I I I I I 11111111 Ill I I Ii I I I I II I I I II I III, I I I IllJl I. . . . ... .
Illll'Iilllllllll/ Ill"'l"lll..Illlll"lll'llllllllll II'llllllllll. ll,ll.ll~l.llllllIll
41111Lll I I I I ii I i I l I I I.Ill ! I I il'! I I,l:l I I I I"l I I I I I Ill I I I I I I I I I I I I I i. II i'.rl :llI.I Ill lilt
.... ~ ' L .... [j .... llll'ii..'-i_ii'i.i i I i'ig'-..I.L.I.J.'J,I i~[lJ.i~.l. IL.l lil.i.J.I 'llilL_l,t~LI IJ...ll.ll:l ,l:Lli. l::l:Ai
IIILJ " j: IlL j.,,I,,ll.l,I ,,,,,l,,l,l,l,,I,l,,,,I IjjilJ. L i~ I_LLLI_II .iii I1.1 ,II 1'' ,,,.,IL, I.. ' .'!..
~ Ii'Ir "'"t", ..... :i_' lJl'-~ ~J~ ": ; ...... ~ ,. '~ ~ ii I'l ll'l .. ' :-.l'l'l Ii J J' ". ,~ :i ~.' ~ l'l'-I ;--~ i-I"! I ., _ "l'JI !:-" ~" ~ ! J' I'i' ",'-'?: .. 1'1' I11 I ~', ..,o.. ...... . . ~-~~- , ' I ]'l l'l [1 I, ! II'll'l~ll~lll-l.1 I' ? 1~ ,;_ -~.. ']"J I I' I'J'l I ~' 1 l'lll- !i !:'i~ . ," ~i
,.l.~, J "J~,~,JJ.JJ.I ,,'J..J~J.J".J..J' .l'JJJJl] /~~"".~". ,JlJ~;,!J'JJI' III.
1'1'.1.;~,," .... '~-,"IrT:l'J~.l.l'~ "I'1~11 ~-~.LI,LI.! ..' -' I1'1 .I~ I '~11'1 '"'. rl'.'l'll, r,~iTIIl, llll .tllllll.ll~,:w 'l.ll-m'l )IiI1TF /I. Illl'l IlIIl. II '1.1.
III, III III1~ IIl'rrll"'lJJlJJJj IllII1' Illl 1.1'1Iii111 I..ll'lll.'l'l.I I..I.l.l.llllllllr, Illllll !111111 IIIIII1' IIit1'.11 II
................................ · ~ ... ~ .--,~ .............. . ........ ~. ...... . .
oose
I
l I_LI. I.IL I 1 I I. 1 l I .I i. I' l I.. ti I i_1.1 l I, 1 L l..i.i 1. l I I i I i 1[1.. i 1. l I i 1.1 .ILI'LI,I- I_ l 11 l I I 11 I_1 1.1 I I 1 '1. id. l.J I I 11.1..I I l .I I I t ! ~ 1 _l~l.I
..... 1-11~1.I- .I i: 1 Ii i i I-1-I ! pl--[l I1 i-! i 1 .... I I.I-111 I[llT.iI,i-i i--1i!-i.!.1111 I-i.I1 I.~11,11111111.1.1..I i / i i ! i i i.i.1
II.I I I],~_1111 [ I I I I I I II I I I II1111 I'l I I I I.¢I1~111111 i I I I I I I:.11 I.I I.I I I.l.ll I II['l I I I I I I!1111 Illllll I I I I
L~I I I'~d'.Lidl, L' !' 11.1L~~t~.L],,L~{ r, li,~,l'tO~J:J.l,lLl"l:l-K.l"l' [I'~1,1'~40. LI, i..I.3~11LL I.L.I 1. I~1
FI! I I I ! 1 I-!'1'11'I I-tr-~l'l"l' i I I I I'1111'FI'I I FFI I'!!1111111111~Fl I Tli':! 1~t II'I'TTI I I I.I II1-11'I~111 l%f'll FTI"~i'I
1111t11111111'1111111'11:1111'1111111111111'1111111'! I IIII I1111111'11'111/11.1111111111111111111111!
III!!11,11 IIII1'1111IIIII1111'11111'1__111,'~1.1]111111111.1.1,11 Iltl I.[IIII"I:IIII'IIILIIIIIIIIIIIIIIIIIII,
~fi~ . ~ .~,
~ ,,~ ' ~l,i ~--~ .~ ,:,
' ~' ~ -' " ' ~ / _ . ~ ~ t
, , ,~ ~, .,,,--~:~..-~..... ... :..._ . ~,, , ~~ , ,,,
..... ~'~'~~~'~ ..... ~ .... · " ' . . ~ ' ~ .' .......... ~ ........... ~-:- ~ ,., ~*~ '.-.~~t~ ~.'.=~-- ' ....... =--~ ' ~ ....... ~-~ " --~~
.... . ........... · . ,~. . .. '~ , _, __-- . . . ,,~..,. ~.~'.. ~ .... ~....; .... ~ ...........
~.~. . .,,tl,~. f .
. .~ i. : '
~ ' '., , I;
· ;"+'t '' ..... J-t-~"~
:j -. ,::..%
· ~ , I
' I ' ' ' ~ ' '
:Nl'li .',~i !ll'lll'llllillllllllJlili~'ill~j~liull','uLIJ liil~ltl.llJi._iJ~lil'iilLi'llJlllliilli'lil'ill:ill:/iiilli, llilll/J'lilllll llllillllllililll:ll-ll.iilill Ill"i'i'l
.j t4 . ~'~ .. , _ ...... J ...... I _ II! ..... Ill ....... !11! ~1 ............. I~li.l_ .
'~ ~ t. ri ~: i.l"I..LJJ_~[.i.ki i i i i ii i~~~h_~iNH ~~LN::ffi:i-i-i i;Fi i-ii'i-i-fi--i-i-i:[i'i-,, i i i,!11 I11-1iiil1i[Ii-itrq i H'"L1
~..~tllF~l~i~~l~~l&llli'ltllli.lll~ ~~~~5T~F~~~~~~~}~r~~.~.~.~~.~~ IIFII III I1
~ I '
,~..'i~l['~[lll~lllllffi-[lllllllllllllllllllllll~l, tltl,~'ll '111t1'111,1111[.11111~11~-~11I!1t111 lllllll'l'lllilllllllll~llllllllllli,'ll,ll~lllllllllllllllll):ll
1~ ..~1.i ~,llllllll. lllll.~lllilllllllllllll.llll~rllllllll Illl.lllllllllllll'lllllllLllllll~l I['l[l'lllllllll~l~'[l~[ll~Ilillll~ll~TIIIIlT[lllllll[
I~ 'Ill! ~ill!llllllllllllllllilllllilllllllllllllllllll ~l~l~l.l~l~~-~l~.l.~~l~l~ll~l~ll~~l~l~I
~', '! i'~1 t11111 III I'11111111 IIIIIIIIillllllllllll' IIIIII IIII1.111111111'1111111111111111111'11 IIIIIIl!1111111111111111111'11111111111111111'11~1.'1 III1'I' I'1t1'1'1
....... .
im i
,0
,CZ.
.¢.'~
0 ':
, 'SL~ '
7-.
m
· o e, i:'i 'I~[.ULLLI'tlIIIIIlIIiI' l~lllilllllllltlillllill".:llllllll:l'l'llll:l.tt'll.llt'"q-
o~ . ,~ 1:' :,I!'I'FtTFFFFI~I.I I:11111111111111111'111~!1t.!~111.1~1.111.1:1.1.1111.1-1.1t1.1-1~.,
..- ~,,~-_ ~, · I..'i t ~TTTTTI i-~TI'] I ! 171111111111111111. I.'1~111 q~l I I I I 1.1.i! .l I I I'1. IIIII If
· ~"~:.. ~,, .~ ., ~ ...j..' ~ ii'iTffl'l--I'll-L~l-r"l 1 i I I I I i I I I I I I'1 III I I i 11.:1~111i'!1,1.I~1.1'11 i I:1'1'-I I I.I1:11 Ii I I il I't:-
~.~.~'~'~ .~,'= "' ~1 lllll, llllllllllilIl~_ill, i'lllli'i, ilill:llll':llll:iltJ.ll'iF
· '" °c ' ~ :..i '''~ ~¥EffFFrFEqIT~, I '111111111.11111111I 1.111~i I.l!rl.I I.~'1"111 ! i'1 t'111't'1't'1'1:11'i1'1 [
,~ .~ ~ ~ ~ ,.~ ' ~..!. ,~.E]~I.III III!111111111111111.1.'1tl I'1 !1'i1,111111~ Iii11'11 II1:11111 li-
, ~. '.,.'.~-' 'R ,.'-..' ' - ,]..[..1,L]]ZE]]~I I.II I III!111 IIIIIIII I'1.1 l".r[I i.!.ii ! ! tll I ! I I.I I'11i~11 l.:llI:l I I I ! I,F
~.:~ ~ ij'.~. ~o :::. 1.,.,. ]J;]JZJ~'[I¥IIT1-'I I I I. I i I I 1111111 I!1111 I..I I!.i.111 rill Il I'11t I I I 1~111'.H,I I I I l..i'l:.i
~.' ':'" ":~ ~ ~~..I.t:H.II.~tI....W4~I"~
:,., ~, _ I I'i.I
i . .., I.f 1
... ,_[.....I~ r:: ~,,..,...r- !- ~ ~.¢- .[ . i - ' ~'
!' ..... :''' ' -.n": ,' ':' ,::'", '!i ''' '' ........ ..
· , ~,,,', .., 7 ........ "l' '! !1111
.. .~ ~,,..,,,~.. JT i1' "(': ....
-.I.t-.44-.-'-.-!-.~::! ..... :.:~-'.-.-- -: .......... -:- ........
' -i ,
........ "' .... :I:!
,..~ ...... ,_:_.., ._.'"'-" i ,~ "'~ "'-:-~' !.i :" 111'111111111111111111:!'1'II1~!!!!ill
~..-!_~ ..... ,._._ ._..~L.'.~,":'., ~ !l.J, ill'Uq".q-rl---:.'"'id?-:'!'": 'l.~'"iI I'!l'lltlll!ii~ttllll II1' IIIIIIIIlllllll'll'llil'l, lllllll I'1
.... :,,, i..~ :..u .. I.~;.::1'~:11.1,-.=:..:..:_. ~'-~_::::' _ ..... : .... ~ , . ~ I1~ ... ,. · . .-- ,: ,]: I. IJ_LLL
L. A. Darsow
Area Superintendent
February 16, 1977
File: LAD-128-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco ProductionCompany
P.O. Box 779
Anchorage, Alaska 99510
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
Granite Point 18742 Well No. 26
Please find attached State of Alaska Form P-4 summarizing drilling
operations on Granite Point 18742 Well No. 26 for the month of 3anuary
1977.
Yours very truly,
L. A. Darsow
Area Superintendent
Attachment
Form No. P-4
REV. 3-1-70
,,
t' SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
S. AP! NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18742
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Amoco Production Company Granite Point 18742
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779', Anchorage, Alaska 99510 26
4. LOCATION OF WELL
Leg 4, Slot 8, Granite Point Platform Anna,
771' FNL, 713' FEL, Sec. 12, Ti~N~cEIv~DR12W. S.M.
10. FIELD AND POOL, OR WILDCAT
Granite Point
1 !. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 12, T10N, R12W, S.M.
12. PERMIT NO.
76-77
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING-AND ~tl~NTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY' OTHER SIGNIFICANT CHANGES IN HOLE CONOITIOf~/~ .... Cl'[ (~il &l'lCJ Gas 0oim~rvation
January 1-3: Drilli~'~ air~~l hole, TD 10,860'.
January 4-5:
Coring and logging hole, TD 10,860'.
January 6-8:
Plug back, set permanent bridge plug at 10,310',
verbal approval given to Bill Halvorson from Hoyle
Hamilton 1-6-77.
January 9:
Perforate well at the following intervals:
8216-8266' 8680-8744'
8270-8296' 8975-9000'
8307-8340' 9485-9530'
8469-8589' 9540-9795'
8637-8660' 9888-10,045' PBD 10,310'
January 10:
Run casing scraper,.PBD 10,310'.
January 11-14:
Run 3-1/2" dual tubing, PBD 10,310'.
January 15:
Rig released 0800 hours, PBD 10,310''
January 16-18:
Hooking up production piping and Kobe manifold,
PBD 10,310'.
January 19-20:
Well not pumping, wireline out standing valve,
PBD 10,310'.
January. 21-25:
Run new standing valve, pump on test, PBD 10,310'.
January 26-31:
Well shut-in, waiting on rig.
14. l hereby certify ~j: the foregoing is true and correct
SIGNED ~/~,'"' .......~F'~.~,~ ~__ TITLE__Area Superintendent DATE February 16, 1977
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
January 14, 1977
File: LAD-056-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
Granite Point 18742 Well No. 26
Amoco Production Company
P. O. Box 779
Anchorage, Alaska 99510
Please find attached State of Alaska Form P-4 summarizing drilling
operations on Granite Point 18742 Well No. 26 for the month of December
1976.
Yours very truly,
L. A. Darsow
Area Superintendent
Attachment
RECEIVED
JAN ! ? I 77
Division of 0tl and gaa COnae~ation
Form No. P-4
REV. 3-1-70
..
IN DUPLICATE
SUBMIT
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. AP! NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18742
1. OIL ~] GAS ~] 7. IF INDIAN'ALOTTEE OR' TRIBE NAME
W~LL WELL et. ER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Amoco Production Company Granite Point State 18742
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Al( 99510 26
4. LOCATION OF WELL
Leg 4, Slot 8, Platform Anna, 2900'
FWL, 900' FSL Sec. 1, T10N, R12W, S.M.
10. FIELDANDmOL, ORWIL~AT
Granite Point
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 1, T10N, R12W, S.M.
12. PERMIT NO.
76-77
13. REPORT TOTAL DE~H AT END OF MO~H, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DE~H
SET AND VOLUMES USE~ PERFORATIONS, TESTS AND R~ULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Status as of November3D, 1976
Fishing at 8853
December 1-4 Fishing
December 4 Set cement plug at 8675'
December 10-12 Stuck 9124'
December 12-20 Drilling TD 10,344'
December 20-24 Lost circ
December 24-25 Logging IES,. GR Sonic, GR Density, and dipmeter 10,336-8000'
December 26 Set 7" liner 7728~10,338' w/750 sx C1 G
December 27-31 Drilling TD 10,683'.
RECEIVED
JAN 1 71;??
Division of 01t and Gas Co.;ervation
14. ! hereby c~ti~t~he~alt$~, true and correct
Area Superintendent January 14, 1977
TITLE DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
02-001B
STATE
of ALASKA
Division o:f Oil ant.! Gas Conservation
TO: V
~.,~ELL FILE
FROA/b
Hoyle H. l!ami lton//~
Director
DA?E , January 7, 197~
·
SUBJECT:
.Amoco T:~ell No. 26
Granite Point Field[
Bill Halverson,, ~/oco, called January 6, 1977 to repor~ they
have drilled a 6" hole from base of 7" liner at 10,336 to
10,860'. Tested top 200' of this interval and. recovered only
10 bbls. of mud. Cut core in bottom and recovered mostly shale
at dips between 80-85o. Logged and found only one s~a.ll tight
sand in entire interval. No pay indicated. I gave him verbal
approval to set a bridgo plug in'bottom of 7'' liner and proceed
with the remainder of their program which calls for COmpleting
in C-3 through C-7 sands at selected interval~s.
HHH: be
G. J. Ross
Area Superintendent
December 29, 1976
V4 f.-
Amoco Production Company
P.O. Box 779
Anchorage. Alaska 99510
File: GJR-973-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Notice of Intention to Change Plans
Granite Point State 18742.Well No. 26
Permit No. 76-77
Reference is made to telephone conversation between Lonnie Smith of the
Division of Oil and Gas and. Bill Halvorsonwith Amoco concerning the
captioned well. This will serve to"document that conversation. While
drilling 8-1/2,' hole at 10,344.', lost circulation was encountered.
Amoco logged and set a 7"9 26# N-80. liner at approximately 10,336' with
the iiner top at approximately 7727.'.. A 6" hole will be drilled to a
total depth of 10,700' (9962' TVD), logged and tested. If productive, a
5", 18# N-80 liner will be set at TO and hung from approximately 10,050'
in the 7" liner. The liner' will be cemented in its entirety to cover
all pay.
Operator also proposes to drill to 10,700,' rather than 10,500' in order
to penetrate the entire C-8. This well will be the only C-8 producer in
the southwest quarter of Section 1, T10N, R12W,'S.M.
Attached for your approval is a completed Form 10-403 outlining the
above change in plans.
Yours very truly,
Area Superintendent
Attachment
.,.
o 0 t9'76
DN~SION OF O{[ At, iD GAS
Form 10-403 ( Submit "1 ntentions" in Triplicate
REV. 1-10-73 . & "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADL-18742
1. OIL [~ GAS D 7. IF INDIAN, ALLOTTEE OR TRIBE NAME
WELLI~Y~J WELL OTHER
2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME
Amoco Production Company Granite Point State 18742
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 26
4. LOCATION OF WELL
Atsurface 771' FNL, 713' FEL, Section 12, T10N, R12W,
S.M., center of Leg 4, Slot 8, Granite Point
Platform Anna
13. ELEVATIONS (Show whether DF, RT, GR, et~)
105' RDB-MS[
14.
Check Appropriate Box To Indicate Nature of Notice, Re
10. FIELD AND POOL, OR WILDCAT
Granite Point Field
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 1, T10N, R12W, S.M.
12. PERMIT NO.
76-77
3orr, or Other Data
NOTICE OF INTENTION TO.'
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING L_~
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other).
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAI RING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AClDIZING ABANDONMENT*
(Other)
(NOTE-. Report results of multiple completion on Well
Completion or Recompietion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
While drilling 8-1/2" hole at 10,344', operator lost circulation.
Operator logged and ran a 7", 26# N-80 Buttress liner at approximately
10,336' with liner top at 7727'. A 6" hole will be drilled through the
C-8 to approximately 10,700' MD, 9962' TVD, logged and tested. If
productive, a 5", 18# N-80 Buttress liner will be set at total depth,
hung with the liner top in 7", 26# casing at 10,050' and cemented in its
entirety. Collapse safety factor at TD will be 2.25 with 9 ppg mud.
Operator proposes to drill to 10,700' rather than 10,500' to penetrate
the entire C-8.
DIVISION OF OiL"
,~'. ,,~0 GAS
SIGNED _/~=.IK..~3~ ~ ~' -w
(This space for State o ce use)
TITLE Area Superintendent
DATE December 29, 1976
A PRO ED BY . TITLE
CONDITIONS O~'~"~OVAL, I~ Ah%;.. ......
See Instructions On Reverse Side
Approved Copy
Returned
Amoco Production Company
P.O. Box 779
Anchorage. Alaska 99,510
G. J. Ross
Area Superintendent
December 15, 1976
File: GJR-941-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska. 99501
Dear Sir:
Re: ..Monthly Report of Drilling and Workover Operations
Granite Point 18742 Well No. 26
Please find attached State of Alaska Form P-4 summarizing drilling
operations on Granite Point 18742 Weil No. 26 for the month of
November 1976.
Yours very truly,
George J. Ross
Area Superintendent
Attachment
Form No. P-4
REV. 3-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WELL WELL OTHER
2. NAME OF OPERATOR
Amoco Production Company
3. ADDRESS OFOPERATOR
P. O. Box 779, Anchorage, AK 99510
4. LOCATION OF WELL
771' FNL, 713' FEL, Sec. 12, T10N, R12W,
Center of Leg 4, Slot 8, Granite Point Platform Anna
5. APl NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADL-18742
7. IF INDIAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Granite Point State 18742
9. WELL NO.
26
I0. FIELD AND POOL, OR WILDCAT
Granite Point Field
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Section 1, T10N, R12W, S.M.
12. PERMIT NO.
76-77
13. REPORT TOTAL DE~H AT END OF MOTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DE~H SET AND VOLUMES USE~ PERFORATIONS, TESTS AND'R~ULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICA~ CHANGES IN HOLE CONDITIONS.
Status as of November 1, 1976, Turbodrilling at 6427'
November 1-2 TD 6427' Turbodrilling
November 3-12 TD 6535' Drilling
November 13-14 TD 8211' Condition Hole
November 15-16 TD 8211' Logging
November 17 TD 8211' Run 9-5/8" 40# & 43.5# S-95 buttress casing to
7985'. Cement w/700 sx Class G
November 18-29 TD 8853' Drilling
November 30 TD 8853' Fishing
DIVISION OF 0~'~. AND GA5
SIGNED: ~-~----~~ //, /~2~-~~. Area Superintendent December 15, 1976.
. TITLE ~ DATE.,
NOTE--Fleport on this fo required for ench cnlendnr month, regerdless of the stntus of operations, nnd must be filed in duplicnte with the
oil end gns conservation oommitt~ by the 15th of the succeeding month,unless otherwise directed.
G. J. Ross
Area Superintendent
November 16, 1976
File: GJR-857-WF
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Notice of Intention t° Change Plans
Granite Point State 18742 Well No. 26
Permit No. 76-'77.
Reference is to your letter of October 13, 1976 granting the permit to
drill the above referenced well at .a location in Section 1, T10N, R12W,
S.M. Subject well was Spudded'on October 19, 1976'. While drilling
12-1/4" hole at 8211' MD on November 10, 1976.,.lost circulationwas
experienced. The resultant drop in fluid level allowed water and gas to
enter the wellbore and well control was possible only after spotting
lost ~irculationmaterial and a 50-sack cement plug near the bottom of
the hole. In order to prevent future influx from upper zones, Amoco
proposes to log and set 9-5/8"intermediate casing at approximately
7975'. An 8-1/2" hole will be drilled'to total depth and a 7", 26#
N-80 liner will be set at TD and hung from approximately.7700' in 9-5/8"
casing. The liner will be cemented in'its entirety to cover all pay.
Operator also proposes to move the target location at the top of the
C-8 sand 500' due west from the location for which this well was per-
mitted. This location is expected to.be' 200' vertically deeper on the
west flank of the Granite Point structure. It will allow for more
efficient recovery of trapped oil from the western crestal and flank
area. It will also assist in the geologic interpretation of the west
flank of the structure. This well wiI1 be the only C-8 location in the
southwest quarter of Section 1, T1ON, R12W, S.M.
-2-
Attached for your approval is a completed Form 10-403 outlining the
above changes in plans.
Yours very truly,
George J. Ross
Area Superintendent
Attachment
Form {0-403 (- Submit "1 nten tie,r," In T ripilcate (..
REV. 1-10-73 & "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to clrill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADL-18742
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
1. ~/~kLI~l C'AS ~] OTHERWELL
2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME
Amoco Production Company Granite Point State 18742
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 26
4. LOCATION OF WELL
At surface
771' FNL, 713' .FEL, Section 12, T10N, R12W,
center of Leg 4, Slot 8, Granite Point Plat-
form Anna
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
105 ' RDB-MSL
Check Appropriate Box To Indicate Nature of Notice, Re
10. FIELD AND POOL, OR WILDCAT
'Granite Point Field
11. SEC., T., R., M., (BOTTOM HOLEOBJECTIVE)
Section 1, T10N, R12W, S.M.
12. PERMIT N.O.
76-77
~ort, or Other Dafta
NOTICE OF INTENTION TO:
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
'REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT oF;
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENTH ALTERING CASING,
SHOOTING OR ACIDIZJNG ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent d~tes, including estimated date of
starting any proposed work.
While drilling 12-1/2" hole at 8211', operator lost circulation and ex-
perienced water flows accompanied by gas from upper zones due to the
droP in fluid level. Operator spotted lost circulation material and a
.50-sack cement plug at 8040" and controlled influx to wellbore. Operator
.proposes to log and run 9-5/8", 40# and 43..5# S-95 Buttress casing at
approximately 7975'. An 8-1/2" hOle will be drilled through the C-8
zone to approximately 10,500' MD, 9938' VD, and a 7", '26# N-80 Buttress
liner will be set at total depth, hung in 9-5/8'", 43.5# casing at 7700'
and cemented in its entirety. Collapse safety factory at TD will be
1.17 with 9 ppg mud.
Operator proposes, to change bottom hole location at the top of the C-8
zone from 900' FSL, 2400' FEL to 900' FSL, 2900' FEL, Section 1, T10N,
R12W, S.M. The C-8 top is expected at 9100' TVD, or 200' lower than the
original location. The new location is desirable in that it provides
for a more efficient trapped oil recovery f~ ~ .~~.t~f~-z~ o.~.~che
Granite Point structure... '.
197
16. I hereby cerlfy that the foregoing Is true and correct
SIGNED . j..,~_jr. ~] ....
Area Superintendent '';' November 16, 1976
DATE '
(This space for State office use)
CONDITIONS OF OVAL,'I ANY:
See Instructions On Reverse Side
Approved c. op/y
Returned
,
-- , .
Amoco Production Company
P.O. Box 779
Anchorage. Alaska 99510
G. J. Ross
Area Superintendent
November 10, 1976
File: GJR-842-WF ·
Mr. Hoyle Hamilton, Director
Division of 0il and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501.
Dear Sir:
Re: Monthly Report of Drilling and'Workover Operations
Granite Point 18742 Well. No. 26
Please find.attached State of. Alaska. Form P,4 summarizing drilling
operations on Granite'Point 18742 Well No. 26 for the month of
October 1976..
Your~ very truly,
George J. Ross
Area Superintendent
Attachment
Form No. P-4 . ( SUBMIT IN DUPLICATE (
REV. 3~ 1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
S. APl NUMERICAL CODE
50-133-20297
6. LEASE DESIGNATION AND SERIAL NO.
ADC 18742
1' OIL [-~ GAS ~ 7. IF INOIAN'ALOTTEE OR TRIBE NAME
W~LL''~ WELL'' OT.ER
2. NAME OF OPERATOR S. UNIT FARM OR CEASE NAME
Amoco Production Company Granite Point State 18742
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 779, Anchorage, AK 99510 26
4. LOCATION OF WELL
Leg 4, Slot 8, Platform Anna, 2900' FWL,
900' FSL Sec. 1, T10N, R12W, S.M.
10. FIELD AND POOL, OR WILDCAT
Granite Point
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 1, T10N, R12W, S.M.
12. PERMIT NO.
76-77
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Status as of October 31, 1976 turbodriliing at 6266'.
October 10-25
Spud October 19, 1976. Previously set 0-600'
20'; 2022' of 13-3/8 casing. T.D. 5522'
Mud 8.9# Drilling 12-1/4".
October 26-31 T.D. 6266' turbodrilling.
14. 1 hereby ~'e]riify that the foregoing/~t~ugnd correct
TITLE Area Superintendent
DATE 11-10-76
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise, directed.
02-001B
'STATE
· to: I'--
Thru:
FROM:
iZ.,
DEPARTMENT OF NATURAL RESOURCES
Division of Oil and Gas
Conservation
Hoyl e H. Hami 1ton
Director
Chief Petroleum Engineer
Ben LeNorman
Petrol eum Inspector
DATE : October 21, 1976
SUBJECT: BOPE Test, Amoco GP-26
P1 atform "Anna"
OctobeK 18,. 1976 - Departed igy.., home at 10:00 AM ..for. a 10:30 AM showup
and ll:OOAM departure via A,A.1. ~;wiln otter .for Kenai. Departed Anchorage'
at, ll:lO AM, arri'.ving in Kenai at ll:40 AM where I rented, a car and drove.
to tl~e Amoco-Shell. heliport, l,arrm..iving at ..12:15 PM.. Departed..the heliport.
at 12:25 PM and arrived on iP..latforlll "Anna" at 1211:.40 .PM where I. was met by.
Baby Can son, Amoco drt 11 tng forenmn,, and Ken..Dennington, .Parker..Dri 11 ing..
Company toolpusher .......... . .......
.Barney Canson advised they 'W.°'.U.'.]d. pressure up wi.th .the.T, lO Hal l.li burton
pump using clear, water inasmuch as .the. pump house had.not .been skidded ,and.,
no mud mixed. He further advised they.were having problems with leaking
swivel packing and' the test p.lug would .not .seal due to corros.ion problems
in the bowl of the OCT castn.ghead which was installed in 1967..
We. toured the rig' which was' i:n good .repair, the ..well, sign was .'up and:
general housekeeping was good..... Accumulator pressure. Was...2600 psig, N2
backup bottles tested. 1400, 2'200, 1850, 23001a'nd' 7,00. psig...
ACtual tests, began at 2:30 PH,...b.ut sw't. ve.]..., packing ..p:robl..ems..c.ontinued to
plague u.s. By 5::t5 PM 'the .swt..,vel..problems. had :been..corrected .andl the..kelly
cock tested to 3000 pstg. 'By .8:.00 PM,.: with the .:use..of bar. i.te:,, we. finally ..
.gOt the test plug to s.eal and .the upper pipe rams.,... HCa. valve on the choke '
line and. wing val.ve on the kill., lin.e tested te...3OO.O..pSig...Hydrt.1 .tested
to' 1500 psig. Lower piPe rams,, blin.d, rams and.:..;check.Valve ..on.. the kill
.line tested to 3000. psi. g. Te:n plug.va, lves and .forty.-eight fTanges in the ...., ..
· .choke mantfoid ..we're. tested to. 3000. psig.. The...~Cameron.. automatic..choke was
.actuated and the manual adj.uSta'ble .choke was free moving .... Lower kel.ly
va. lve and kelly tested to 3000 psig..Both., dart and. bal. l..type plug valve .... ..
Were in positi.on at the dra~avorks. ,Final],y,l: the ~13,3'/8". casing, was tested.
to 1000 psig and tests were concluded at..ll:O0 PM, '..i.
A field inspection report waS,prepared w.i.th the...or.t..ginal ..ooi.ng to Barney ....
Canson, a copy mailed to Bt.ll.. Halverson., and :a..copy l.a.~:tached .to this report..
October 19, 1976 -'Departed' .~lamtform ".Anna" a.t...8:3D.AM and .arrived at ..
A~lO~b'LS.hleil he-TiPort at 8:45 .AM, Departed .hel. iport at 8:50 .AM and arrived
at Kenai Airport at 9:10 AM., .... Departed. Kenat..v~a.A,A.I..t~vin...otter at ....
10:35 AM, arriving in Anchorage at ll :0§ AM .and at my .home. at l1:35 AM.
in sun, nary: I witnessed su¢~'essful BOPE ..test and testing of 13 3/8" casi. ng.
on. ~CO ~P-26 Platfom "Anna" ......
Attachment
Ala. Oil and Gas Conservation Con, nit '-
.
..... Field inspec_tion Re~ort .... .
Drlg. Permit No.?~;-~ ~~ Well/platfm sec_/
Operator y~.~.~_~-.._~ Represented by ~^~.~.,y Name &' Number ~..~C)%-~
Satisfactory my~e~ ~nspec~l on~ J~u~ ~, ~u uury . Type Inspec~l on ii
Yes No Item (~)~'Location,General- Yes No Item (~BOPE Tests
(~)~ ( ) 1. Well Sign (~ (') 15.-/~,~'~CaSingSet @ :,~~ . ..~:
(:.)~ ( ) 2. General Housekeeping (~,)~ ( ) 16.' TeSt f'luid-(~q~Ft~)mud-( ) oil .'i
( ) ( ) 3. Reserve Pit-( )open( )filled (~.)~() 17. Master Hyd. Control 'Sys..-_~sig
(~)~" ( ) 4. Rig
() ()
() ()
( ) Safetj/ Valve Tests
5. Surface-No. Wells
6. Subsurface-No. Wells
( ) Well Test Data
( ) ( ) 7. Well Nos.__, ,__,
( ) ( ) 8. Hrs. obser__,__,__,__
() () 9. BS&W
198.I _N. 2 btls,~, ~~j~,t~, _,q~PS]g
1 . Remote Controls ·
(-)
(~'() 20. Drilling spool' ~"Outlets' -~~'~]i
(~-~ ( ) 21 ~ Kill- Line-(~rCh6ck valve
()~)~ ( ) 22.-Choke .Flowline-'-'(~/'~HCR valve
(~ ( ) 23. Choke Manifold No-." valvS/~-fl~s .Y~J~'
(~.() 241.. Chokes-(~)~emote( )Pos.(~d.i
(~(). '25.. Test Plug-(~)~ellhd(')csg( )none
( ) ( ) 10. Gr. Bbls. , (~ ( ) 26" Annular'Preventer~~sig
( )Final Ab-~Jndon~ent -- (~ ( ) 27' Blind Rams',~_~pslg
( ) ( ) ll. P&A Marker (~)~() 28J Pipe.Rams .~)~psig (.~,)
( ) ( ) 12. Water well-( )capped( )plugged (~)~() 29' Kelly & Ketl.y-cock~psig .
( ) ( ) 13. Clean-up (bJ~: (')-' 30~! Lower Kelly. valve~si?
( ) ( ) 14. Pad' leveled . (~)~ ( ) 31-.~ safety FloOr val'ves-(~q)V-,-~l~art
Total inspection observation time ~x hrs/~i~ Total number leaks-and/or equip, failures
Remarks ....
.-..
days or when ready
_ __
. _
Inspected by ._. .,., Date?~_,~./_../~ ..,:. ~
.
.
October 13, I~)76
Granite Point State 187~,2 No. 26
Amoco Product ion Company
State Permit No. 76-77..
George J.. Ross
Area Super I ntenden t
Amoco Production Company
P. O. aox 7.79
Anchorage, Alaska 9~510
Dear S! r:
Enclosed Is the approved apptlca, ti'on f°r.permlt to.dri1.1 the above referenced
well at a ~.ocatton In Sect'ion I, To~ns'hlp ION, Range 12~/~... So I~.
~/el! samples, core chips a.nct' a. mud. log are not requ~:red. A directional
survey Is required.
Finny rivers In Alaska and their dral:nage systems .have.been c]a.sslfled as
important .for the s~l.m3 or migration .of anadromous f~sh..: Operatl.ons I.n
these areas are subj~ect 'to AS 16..50.870 and the .regulations promu, lgated
thereunder (Ti'tie 5.~ Alaska. Admlnist.r. ative Code) ...... Prior to comaenclng
operations you may be. contacted by t.he Habitat Coordlnator~'.s offi..ce, 0epart-
ment o.f Fish and Game..
Pollution. of any waters of the State is prohibited by AS q~;, 'Chapter 03,
Article 7 and the reg,ulattons..p'romulgated thereunder (Title '18, Alaska
Adel:nis. tratlve Code, Chapter 70) and by the Federal ~/ater Pol.lutlon .l:ontrol
Act., .as nme.haled. Prior to: coeemnclng operations you may be .contacted by
a representative .of the Depar..tment .of Envi.ronmenta! Conservation.
Pursuant to AS 38..40, Local Hire Under State Leases, the Alaska Department
of Labor Is being not'lfled .of the issuance of this permit to drlll...
To aid us In schedullng fieJd.~ork, we ~ould appreciate your notifying this
Offlce within ~8 hours after, the well is spudded. We would also like to be
notified so-that a representative of the Olvlsion may be present to .witness
tes. ttng of 'blowout preventer equipment before 'surface cas. lng shoe. is drilled.
G. d. Ross 2- October 13, 1976
In the event of suspension or abandonment please give this office adequate
advance notlficatlon so that we may have a witness present..
Very truly yours,
Hoyle H. Haml I ton
Cha i rman
Alaska 011 and Gas Conservation Committee
Enclosure
CC:
Department of Fish and' Game, Habitat Section w/o encl..
Department. of ,Eev! roneenta! Conservat'! on . w/o. enc.l.
Department of Labor., Supervlsor, Labor Law Compll.ance
Olvislon w/o
Amoco Production Company
P.O. Box 779
Anchorage. Alaska 99510
G. J. Ross
Area Superintendent
September 29, 1976
File: GJR-729-WF
Mr. HoyleHamilton
Division of Oil and Gas '
Department of Natural Resources
State of Alaska
3001' Porcupine Drive
Anchorage, Alaska 99501'
Dear Sir:
Re: Application for Permit to Drill
Granite Point State 18742. Well No. 26'
CONFER:
FILE:
Attached is a completed Form 10-401', Application for Permit to Drill,
for. Granite Point State 18742 Well No..'26'.~ This well will be drilled
from Leg 4, Slot 8 on Platform Anna to'a target'location at the'top of
the'C-8 zone at 8900'!..TVD, 900"' FSL, .2400"' FEL, Section 1, T10N, R12W,
S.M. All zones through the'C-8 will be'Penetrated to allow log evalua-.
tion, and the'well will be'selectively perforated, and stimulated if
necegsary. This well is required'in order to'recover trapped oil and to
improve conformance from the' Crestal portion of the' Granite Point struc-
ture. We hereby' request administrative approval of this location as the
well will belthe'fourth Completed'well in the' SE 1/4. of Section 1.
Also attached is a draft in the'amount of $100 for the'filing fee, along
with a BOP sketch and a plat of the Granite Point Field. We anticipate
being in a position to spud subject well during the week of October 10,
1976,.'
Yours very truly,
George J. Ross
Area Superintendent
Attachments'
Form 10-;01 '
REV. 1-1-71
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
la. TYPE OF WORK
DRILL ~; DEEPEN ["-]
b. TYPE OF WELL
OIL [] ' GAS .[~
%~ LL WELL OTIIER
2. NAME OF OPERATOR
SIIIIMIT IN 'i'1{11'1 ,. fF
(Olhet in.qruction,,; on
reverse side)
SINGLE
ZONE [] MULTIPLE
ZONE
Amoco Production Coma~
3. ADDRESS OF OPERATOR
P. O. Box 779, Anchorag~ Alaska 99510
4. LOCATION OF WELL
Atsufface 771" FNL, 713' FEL, Section 12, T10N, R12W, Center
of Leg 4, Slot 8, Granite Point Platform Anna
At proposed prod. zone (~OO o~f__C_-p _zone at 89_00' TVD)
900' ~St, 'z~O.O FEL, Sec. 1, T10N, R12W, S.M.
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN.OR POST OFFICE'
" 7-1/2 miles southwest of Tyonek, Alaska
14. BOND INFORMATION:
blanket Surety and/or No.
15. DISTANCE FROM PROPOSED *
LOCATION TO NEAREST 2880' from west
PROPERTY OR LEASE LINE. FT. '
(Also to nearest drig. unit. it'a,~y) line' of ADL 18742
]8. DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING,COMPLF'.TED, 1300' NW
OR APPLIED FOR, FT.
from GP 18742 Well No. 4
21. ELEVATIONS (Show whether DF, RT, CR, etc.)
t l6.
No. OF ACRES IN LEASE
5060
~ PROI~SED'DE~H
9800'.
APl No. 50-133-20297
$.
6. LEASI:. DFSIGNATION AND SI:RIAL NO.
ADL-18742
7. IF INDIAN, ALLO'I'rEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Granite Point Sc'ate 18742
9. WELL NO.
26
,10. FIELD AND POOL. OR WILDCAT
Granite Point
!1. SEC., T., R.. M., (BOTTOM
l lOLE OBJECTIVE)
Sec.' 1_______, T10N, R12W, S.M.
12.
Amount $100,000
17. NO.ACRI:~S ASSIGNED
TO TI'lIS WEL. L
8O
20. ROTAR'Y OR CABLE TOOLS
rotary
22. APPROX. I)ATF' WORK WILL START
10-10-76.
105' RDB - MSL
PROPOSEI) CASING AND CEMENTING PROGRA~'--~ '
26" | ~0-;;-'~ ]94¢-~"7-, - '
~~ · ' __ , .... ozz J. zu3 sx, previousl set 7-9-
17-1 2" 13-3 8" 54.'5# 2 (7-9-67)
: , assuming ~]~ ppg mud]~
Operator proposes to directionally drilI welI from existing. 13-3/8"
casing in Leg 4, Slot 8, Granite Point' Platform Anna. There are no
'affected operators. All zones through the C-8 sand member of the
Middle Kenai "C" Unit will be evaluated and the well will be selec-
tively completed as a producing oi'l well. Subject well will.be spudded
on or about .October 10, 1976. A plat and a sketch of BOP s~a..c:~ ;a.r~:ange- .;...: ;.; .........
meat are .attached. i, !.i: [i:':~ {!:] !'.'"~ !:. "" ~ '"
}, ,, , ~ ,: ,,
[ ~ ~.~, i .!
IN ABOVE SPACE DESCRIBE PROPOSFA) PROGRAM: if propo~l is to deepe~i give d;,fa on present productive zone pad proposed
new productive zone. If propo~d is to drill or deepen dffection;flly, give pertinent data on subsurface locations and m¢.'tsured and trt, e
vertical depths. Give blowout preventer program.
SmSm)-~~~' ~C:*~J ' OATE~tember 29~ 1976 ~TLE'~rea Superintendent
(This space for Stale. office pse)
ISAMPLES AND CORE CI'HI~ REQ.UIRED
~ YES j~ NO
, DIRECTIONAL SURVEY REQUIRED .
· ~VES [] No
MUD LOG
[] YES
CONi)ITIONS OF AI'I'ROVAI.,, IF ANY:
[] NO
OTltER REQUIREMENTS:
A.P.I. NUMERICAL CODE
50-]33-2o297
PERMITNO.: 76-77 APPROVAL DATE October 13, 1976
APPOVE'DBY-- "/~~~'~f"- ~ . " TITLE Chairman DATE' October 13: 1976_'
'~' ~' *See Instruction On Reverse Side
. .(/~,~:o) · Amoco Pr<~duction Comp, r,L~
· · · ' o ENGINEERING CHART ~, APPN
·
· I
Ii
.~,
; ,3?
. .
ELL 2L,, Lo¢R'r'~o,l,".i
II
.SEc-
T'ION I
...~ ~ c r,j/c~/'V. I~,
,I
I
I
I
I
I
I
I
O~-O01B
STATE
of ALASKA
DEPARTMENT OF NATURAL RESOURCES
Division of Oil and Gas Conservation
TO.- I--
WELL FILE
Hoyle H. Hamilton
FROM:
Director
DATE : January 7, 1976
SUBJECT:
Amoco Well No. 26
Granite Point Field
Bill Halverson, Amoco, called January 6, 1977 to report they
have drilled a 6" hole from base of 7" liner at 10,336~to
10,860'. Tested top 200' of this interval and recovered only
10 bbls. of mud. Cut core in bottom and recovered mostly shale
at dips between 80-85°. Logged and found only one small tight
sand in entire interval. No pay indicated. I gave him verbal
approval to set a bridge plug in bottom of 7" liner and proceed
with the remainder of their program which calls for completing
in C-3 through C-7 sands at selected interval, s.
, .
R~',,TS
CHECK LIST FOR NEW WELL PE ''~ Company
Yes . Ho Remarks
· . _
Is the pe.rmit fee attached .....................
Lease & Wel
Is we!l to be loca~a in a defined pool · ·
Is a ,-~nist=red survey plat attached
Is well located D,'oDer distance from propeF.5 line
, i
j,
. Is well located pro2er distance from other wells .
. Is sufficient undedicated acreage available in this ~ool .
. !s ;.:ell to be de,.,iated ....
Is o?erator the only a=~
,Tected party . .
. Can permit be approved before ten-day wait .
. .Does operator have a bond in force
. Is a conservation order needed ...........
Is administrative approval needed .
Is conductor string provided ..................
. Is enoueh cement used to circul'ate on conductor and surface
Will cement'tie in surface and intermediate or prod.uction strings
,. Will cement cover all known productive horizons . . .. .....
'. Will surface casing p. rotect fresh water zones' . ......
Will all casino mive adequate safety in collapse, tension & burst
~
Does BOPE have sufficient pressure ratinfi· · m.c~. ~./?...,.
.id~tional Requirements'
.,
,.
· :
2. DprO,.'a 1 RecommenceJ'
Geolomv Enoineerin~.'
TR,~; HWK ~:/'~/"" 0 ?',G . HHH
JAL '- '""'" ECS ,7"'~'""JCM ~
~ ised 1/15/75