HomeMy WebLinkAbout177-031Memorandum
To: Well File: A-31-14 Permit # 77-0031
Re:
Administrative Abandonment Action
Middle Ground Shoal A-31-14 Permit # 77-0031
State of Alaska
Oil and Gas Conservation Commission
June 20, 1994
This memo will remain at the front of the subject well file.
Well A-31-14 was replaced by A31-14LW (permit # 94-0044, APl # 50-733-20305-62) when the permit
was approved 3/23/94 and operations completed in May, 1994. The replacement well incorporates a
lateral with the existing well bore. The lateral along with the original hole will be used for production of
hydrocarbons. A review of both well files indicates administrative abandonment of the originating well
bore is appropriate according to current AOGCC procedures for wells where additional permitted laterals -
are drilled from an existing well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and APl number. Administrative abandonment
of the original permit only eliminates duplication in the databases. Information for the original well and its
replacement will be maintained in their respective files.
The operator has been notified of this action. All future correspondence with the AOGCC should reflect
the new permit number, APl number and well data.
tat~st~cal
Statistical Technician Technician
Reservoir Engineer ) 4~'9~ Petroleum Geologist
Commissioner
N N
ra~e i ~i ~
Maunder, Thomas E (DOAj
From: Jeff_Gasch@xtoenergy.com
Sent: Tuesday, February 24, 2009 91:43 AM
To: Maunder, Thomas E (DOA)
Cc: Regg, James B{DOA); Paul_Figel@xtoenergy.com
Subject: RE: XTO Energy - Platform A Conductors
~~~ ' ~ ~ `
Tom, I~3t~-~~~VJ `~sr,.\c:~.~~~ ~ ~.3 \~~ ~ tS~~ ~~c~O'~.
7he 10-404's for welis #6 & 7 in the list below A31-14LW {194044) &A32-11 R(193-092)) were sent via Fed-Ex ~~
yesterday. The only outstanding 404 is far the A44- 167-035). We will submit this sundry report when repairs
are complete.
The picture you refer to for the A11-12 was the only copy I had. I will check with our Alsaka personnel to see i#
they have a better quality image.
Thanks,
Jeff Gasch
Production Engineer
XTO Energy
Office # (432) 620-6742
Cell # {432) 638-7433
Fax # (432)~ 687-0862 . ~ , , ; ~ s~", ~ ;
, _ r ~ ~~,w ,~
y'._ `~„ 4.: ~+tsa»r . .,
~ ~~
"Maunder, Thomas E(D~A~" To „~ff Gasch~jctoene com
<tom.maunder~alaska.gov> ~9Y•
~ "Regg, James B (DOA}" <jim.regg~alaska.gov>, Paul Figel{~xtoenergy.com
02/23/2009 05:51 PM Sub~ct RE: XTO Er~rgy - Platform A Conductors
Jeff,
This message follows on our ongoing discussion regarding the repairs to conductor and in some cases surface
casing on Platform A. We have received form 10-404s for first 4 wells listed below. You have indicated that well
#5 wil{ repaired soon. What are the plans for wells 6 and 7? Also in the submitted report far A11-12, tfie °smali"
drawing is rather dark. Do you have a better image? When the document is scanned, the poor image wilE
essentially be totaDy dark.
Thanks in advance. I look forward to your reply.
Tom Maunder, PE
AOGCC
1. A11-12 (166-044} - Ultrasonic Thickn~ss (UT) showed ho-e in conductor 1.5" below tap and other corrosion
{0.160" wall thickness remaining) was noted. Corrosion limited to top of conductor. Grout/cement was chipped
down ta 20" to inspect surface casing. Pian to weld repair conductar and re-fill conductor with grout.
2. A11-13RD2 (181-060j - No visible exterior corrosion on conductor. Conductor UT readings showed corrosion
2/26/2009
~ ~
rage ~ oz L
iimited to top of conductor with minimum reading of 0.300" thickness remaining. GroutJcement was chipped
exposing an 8" band of corrosion ranging from 0.100" to 0.350" wall thickness remaining on the 10-3I4" surface
casing (nominal wall thickness 0.350"). Plan to repair area of corrosion and re-fill annulus with grout.
3. A22-~14LS (194-071) - No visible exterior corrosion on conductor. Canductor UT readings revealed corrosion
(minimum of 0.300" wall thickness remaining} which is limited to the top of the conductor. Graut was chipped
down 6" and surface casing is ready to UT test. If UT test is good then pian to re-grout surFace csg x conductor
annulus.
4. A42-14 {167-041) - No visibie exterior corrosion on conduc#or. UT readings showed scattered corrasion near
top with minimum wall thickness reading of 0.300". Grout was chipped ta 10" depth. UT readings on the surface
casing looked good with wall thickness readings ranging from 0.333"-0.350" (nominat wall thickness of 10-314"
surface casing is 0.350"). Plan to re-flll with grout.
5. A44-11 (167-035) - Two hales found in conductor 15" from top and 7" apart. UT readings show that corrosion
extends downward. At 36" from top minimum wall thickness is 0.100". Grout was chipped down and found smalt
holes in surface csg. Chipped down another 2 feet and found a void in the surface casing x conductar annulus
that extends down +t-35'. This void was filled w/ water. Cut window lower in conductor and drained water.
Surtace casing looks good at this depth. Plan to weld repair surface casing and fill conductor with grout to
surface.
6. A31-14~W {994-044) - No visible exterior corrosion on conductar. Conductor UT readings showed scattered
corrosion extending fram top #0 44" down. Drilled holes in the thin spots of the conductar and found 3-4' void full
of water. Cut a 9" x 10" window in conductor approximately 54" fram top. Surface casing looks good at this
depth. Void extends to approximately 5-6' from top of conductor. Chipped grout from top of conductar and found
1-1/4" x 8" hole in surface casing at 20" from top. Cut window in conductor in-fine with surface casing corrosion to
get a better look at the carrosion and 7-5/8" intermediate casing. The 7-5/8" intermediate casing looks good.
Surtace casing corrosion appears to be limited to the top of the void area. Plan to repair surface casing by
welding fabricated sleeve over area of corrosion then fill void with grout.
7. A32-11R {193-092) - 3 small hoEes in conductor. U7 readings shpwed corrosion limited to top 36" of conductor
with 0.160" minimum wall thickness remaining. Chipped groui dawn from surface of conductor and faund small
holes through surface casing. Waiting on more UT numbers to determine extent of surface casing corrosion.
Plar~ to find extent of corrosion, weld repair surface casing and re-fill annulus with grout.
212si2oo~
~ ~ Page 1 of 2
Maunder, Thomas E {~A)
From: Maunder, Thomas E (D~A)
Sent: Friday, August 22, 2008 10:45 AM
Ta: 'Jeff_Gasch@xtt~energy.c;om'
Cc: Scott Griffith~ctoenergy.com; Paul Figel(a~jctoenergy.com; DOA AOGCC Prudhoe Bay
Subjsct: RE: XTO Energy - Plaiform A Conductors
Jeff, -
Jim Regg and 1 have examined the information you have provided and it will not be necessary to submit sundries
for the work. We will treat your message as equivalent notification. You are reques#ed to submit 404 sundry
reports for each well covering any examination worMc and the u!#ima#e repair(s). In arder to have a complete
re~rd of the work, it would be helpful if you could submit before and after photos that document the condition of
the surFace casings. It appears that with the exception of A44-11 that any damages are ~shallow'. Prior to
finalizing the repairs on A44-11, ptease have the platform contact the Inspectars so that one might travel to the
platform and examine this well. I will ptace a copy of this message in the various wel! fi1es. 1~ will look far the
404s documenting the repairs.
A further question, has anything similar been no6ced on Platfonn C? Ca11 or message with any questions.
Tom Maunder, PE
AOGCC
From: .leff_C~sch@xkoenergy.com [mai#to:~eff_Gasch@xtoenergy.com]
Sent: Thursday, August 21, 2~8 7:49 AM
To: Maunder, Thomas E (DOA)
Cc: Scott Griff'ith@xtaenergy.c~n; Paul_Figel@xtoenerg~r.c~m
Subject: XTO Energy - Platform A Conduckors
Tom,
Per our conversa#ion Tuesday and your request here is a summary of what we have found. We are unsure if we
need to file a sundry notice to repair the surtace casing. Please look this over at your earliest cpnvenience and let
us know if we need to file a sundry. We would like to begin repairs ASAP. Please contact me with any questions.
tn the summer of 2007 production personnel on the piatfiorm nodced a small area of bubbling paint and rust stains
on the conductor of A32-11R. On July 16, 2007 an ultrasonic wall thickness inspec~on was performed on all
conductors on both plat#orms (A & C). Seven conductors on Ptaiform A were iderttified as having possible
corrosion and flagged for further inspection. The remaining conductors on A and all conductors on C appear to
k,~ in good condition.
The annular space belween the outside of ifie surface casing and inside af the conductor pi~ is filled with
grout/cement to the top of the conduc#or. Starting in June 2008 this grout/cement has ~en chipped out to
varying depths on the seven wells in question to determine if any corrosion exists an the surface casing. Below is
the summary of findings for each well:
(Conductor pipe is 24" C?D w/ 0.500" - 0.520" nominal wall thickness)
A11-12 (166-044) - Ultrasonic Thickness (UT} showed hole in conductor 1.5° below top and other corrasion
{0.160" wail thickness remaining) was noted. Conosion limited to top of condactor. GrouUcement was chipped
down to 20" to inspect surtace casing. Plan to weld repair conductor and re-fill canductor with grout.
A11-13RD2 (187-060j - No visible exterior c:orrosion on conductor. Conductor UT readings shawed corrosion
o ~~~- i~nno
~
~ Page 2 of 2
limited to top of conductor with minimum reading of 0.300" thickness remaining. GrouUcement was chipped
exposing an 8" band af carrosion ranging fcom 0.100" ta 0.350" wall thickness remaining on the 10-3/4" surtace
casing (nominal wall thickness 0.350"). Plan to repair area of co~rosion and re-fill annulus with graut.
A22-14LS {194-071) - No visible exterior corrosion on conductor. Conductor UT readings revealed corrosion
(minimum of 0.300" wall thickness remaining) which is limited to the top of the conductor. Grout was chipped
down 6" and surface casing is ready to UT test. If UT test is good then plan ta re-grout surFace csg x conductor
annulus.
l~, ~ ` - \ ~ ~ S ~"~0~~'cc~a b c~c
A31-14LW (194-044) - Na visible exterior corrosion on conductar. Conductor UT readings showed scattered
c;orrosion extending from top to 44" down. Drilled holes in the thin spots of the conductor and found 3-4' void full
of water. Cut a 9" x 10" window in conductor appro~timately 54" from top. Surface casing looks good at this
depth. Void extends to approximately 5-6' from top of conductor. Chipped grout from top of conductor and found
1-1/4" x 8" hole in surtace casing at 20" from top. Cut window in conduc#or in-line with surface casing corrosian to
get a better look at the coROSion and 7-5/8" intermediate casing. The 7-5/8" intermediate casing looks goai.
Surtace casing corrosion appears to be limited to the top of the void area. Plan to repair surface casing by
welding fabrica#ed sleeve over area of corrosion then fill void with grout.
A32-11 R(193-092) - 3 small holes in conductor. UT readings showed conosion limited to tap 36" of conductor
with 0.160" minimum wali thickness remaining. Chipped grout down from surface of conductor and found small
holes through surface casing. Wa~ing on more UT numbers to determine e~ctent of surFace casing corrosion.
Plan to find exten# of coROSion, weld repair surFace casing and re-fill annulus with grout.
A42-14 (167-041) - No visible e~erior corrasion on conductor. UT readings showed scattered corrosion near
top with minimum wail thickness reading of 0.300". Grout was chip~d to 10" depth. UT readings on the surface
casing looked good with wa1! thickness readings ranging from 0.333"-0.350" (nominal wail thickness of 10-3/4"
surtace casing is 0.350"). Plan to re-fill with grout.
A44-11 (167-035) - Two holes found in conductor 15" fram top and 7" apart. UT readings show that c~rrasion
extends downward. At 36" from top minimum wall tt~ickness is 0.100". Grout was chipped down and found small
holes in surFace csg. Chipped down another 2 feet and found a void in the surfac~ casing x conductor annulus
that extends down +J-35'. This void was filled w/ water. Cut window lower in conductor and drained water.
Surface casing looks good at this depth. Plan to weld repair surface casing and fill conduotor with grout to
surtace.
Thanks,
Jeff Gasch
Production Engineer
XTO Energy
Offic;e # (432) 620-6742
Cell # (432) 638-7433
Fax # (432) 687-0862
n inn rnnnn
i
~
~ ~
TO
ENERGY
XTO Energy Inc.
200 North Loraine
Suite 800
Midland, Texas 79701
432-682-8873
432-687-0862(FaY)
~~~~~~~~
February 19, 2009
Alaska Oil and Gas Conservation Commission
Attn: Mr. John Norman
333 West 7~` Ave., Suite 100
Anchorage, Alaska 99501
~-~~ 2 4 2(l09
Al~s~ta Di# P~ ~a~ Ca~as, ~amm~ssion
Anchorape
RE: Sundry Well Operations Report: Well #A31-14LW Conductor Repair
Dear Mr. Norman,
XTO Energy, Inc. hereby submits its Sundry Operations Report (Form 10-404) for the conductor and
surface casing repair performed on the well #A31-14LW. This well is located on Platform A, in the
Middle Ground Shoal Field of Cook Inlet, AK.
Please find attached the following information for your files:
1. Form 10-404 Report of Sundry Well Operations
2. Summary of Repairs
3. Ultrasonic Thickness Inspectors Report
4. Before and After Photographs of Surface Casing
If you have any questions or require additional information, please contact me at (432) 620-6742.
Sincerely,
~~~' `
Jeff Gasch
Production Engineer
Cc: Scott Griffith
Paul Figel
(~~~fi~ ~~~~
STATE OF ALASKA
~KA OIL AND GAS CONSERVATION CC~IS~I~f~f~~~~
REPORT OF SUNDRY WELL OPERATIONS
~~~ask~ ~,~i! ~~ ~a~a ~~~;~. C~rnmission
1. Operations Abandon Repair Well Plug Perforations Stimul q~~~~ Other ~ Repair Conductor
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver~ Time Extension ^
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well ~
2. Operator XTO Energy Inc 4. Well Class Before Work: 5. Permit Drill Number: ~! ~7y,/~
Name: Deveiopment Q. Exploratory~ 19 4• ~~~"'~3 `~~ •~
3. Address: 200 N Loraine, Suite 800 Midland, TX 79701 Stratigraphic ^ Service ^ 6. API Number: ~~ ~`~~
50-733-20305- . a
7. KB Elevation (ft): 9. Well Name and umber:
38' MGS A31-14 • ~
8. Property Designation: 10. Field/Poo (s):
ADL 18756 • Middle Ground Shoal E,F & G Pool ~
11. Present Well Condition Summary:
Total Depth measured 11708 ' feet Plugs (measured)
true verticai 9982 . feet Junk (measured)
Effective Depth measured 11677 feet
true vertical 9967 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor
SurFace 2502' 10-3/4" 2502' 2502' 3130 1580
Intermediate 8745' 7-5/8" 8745' 7845' 6020 3400
Production 1172' 5-1/2" 8474-9646' 7684-8715' 7740 6280
Liner 2124' 3-1/2" 9553-11677' 9544-9920' Slotted Liner
Perforation depth: Measured depth: g510-9534'
True vertical depth: 7624-8600'
Tubing: (size, grade, and measured depth) 3-1/2" 9.2# N-80 8085'
Packers and SSSV (type and measured depth) Baker FHL Pkr @ 8039'. Baker FV-6 SSSV @ 296'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and finai pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 55 ` 84 14 620 210
Subsequent to operation: 55 84 14 620 210
14. Attachments 15. W ell Class after work:
Copies of Logs and Surveys Run Exploratory^ Development Q. Service ~
Daily Report of W ell Operations X 16. W ell Status after work:
Oil Q• Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Jeff Gasch
Printed Name Jeff Gasch Title Production Engineer
Signature Phone (432) 620-6742 Date 2/19/2009
~ s - /~b,.
Form 10- 04 Revised 04/2006 ` .-~v ~ ~~~ ~~~ ~ 4 2~Q~ Submit riginal Oni
~~~ ~ ~i D
~ t . ~ ~Z~~`
~< y
' i
~ ~
A31-14LW Summary of Repairs
8/15/08 - Chipped grout in surface casing x conductor annulus. Cut 9" x 10" window in conductor 54"
down from top and found 2-3' void w/ no cement in surface casing x conductor annulus. Discovered 1"
x 8" hole in surface casing.
8/18/08 - Cut window in 10-3/4" surface casing to inspect 7-5/8" intermediate csg. Intermediate csg in
excellent shape.
9/10 thru 9/13 - Repaired surface casing w/ 46" sleeve. Started replacing windows in conductor.
9/15/08 - UT inspected top and bottom of surface casing above and below sleeve. Thickness was
0.313-.350" at top and 0.330-.390" at bottom.
9/26/08 - Finished welding up conductor. Refilled annulus w/ grout. Installed seal plate on top of
conductor.
~ ~
ACUREN
January 5, 2009
Subject: XTO A Platform Conductor Inspections
Conductor A31-14 Inspection Suminary
Acuren USA Inc.
7911 King Street
Anchorage, AK 99518
Phone:(907) 569-5000
Fax:(907) 569-5005
Materials Engineering and Testing
a Rockwood Company
In June, 2008 during conductor inspections requested by XTO Energy, I performed visual and
ultrasonic examinations on the 24" A31-14 conductor.
While there was no evidence of external corrosion to the conductor, upon UT examination there
were isolated patches of internal corrosion found. An inspection port was cut into the conductor
in order to inspect the 10" surface casing and a small hole was found in the casing. This area of
corrosion was scanned by UT and the corroded area of steel was removed. Inspection of the
7.625"intermediate casing was made through the cut-out and found to be free of corrosion. The
10" surface casing was repaired with a 46" sleeve and re-inspected and the conductor inspection
port was replaced and the conductor was then re-grouted and a plate seal-welded at the top to
prevent ingress of corrosive fluids.
~
Morgan Evans
Inspector
Acuren USA
Kenai, Alaska
; ^ integrity management solutions
12~i0l2007 21:22
rt
±.
~.,,,,,
14
8eam
19~830606
Conductor A31-~14LW
ACt.~'EN US~ ~
~~~
~„
p,
)"
)"
p~
PAGE 05107
.............. _...,..
~~ ~
~
i/,' ~ ' ~ • ,
, ~~
~ ~ ~• • ~
` ~
,
~,~
,~ (
~
~~
2
~,
a«.S~'
~
~ „~~
I-~~. ~ 'tlMeu ~ ~.
"~~, ~ I
.
J ~n
Q
v
~.'i ~.:}~ ~
'~.
~
~
~ ~ ~ '~ ~~ s
,:lNF~ aA'r~ ~
~
~~ `
~ ~ `'\
w}
~.
y ~
..--fF
. V
~ w ~l
~ ~ ~ 6~~ ~ k ~
L7F - ~: 4
~ ~
~
~~•....
' ~~
~r. ~•• ~
{ ~
Y
..
• ..
~
~~
J ~ `
r
.~yd
.
;. p. _..
.~s~ ~~ ~ ~
~ , ~
.. NSK'
, .. ... ,,. ~ - t; ~' ~ ¢'
, 7
~ ~ ~
~~
, ., `
.. ~
~ ' ~` a i~ ,J
~ • ~ 'f~ l ~
~~1 ' - ~_ .
`: ~ ~ ~ -}-
--~
' ! !j . `. ~as , ~
_ p.
'
~
~~
~.
•
' ~
~
'"
.
~
mc
`
a
~
Z
-)
~
~
~
~P
D
m
~
U
c
"~ ` '~1
'~~. _..~
~
z
~
G
~
Z
v
~
E
2
~
G
A
T
~^
1'
m
~
~
~
1
H
Z
~
~
b
U
L
~
A
~
m
0
~
0
~
O
~
~
2
~~,
,~
` ~.
h~ •tl .
i
~ ~y ~ ~ ~$`
~,. °,
~~ ~ ~
~ ~
~
~~~ ~~
, t •
~
~
.:y.
~ ~
~ .~
f
~ ~~~
'
~~
.'~ ..
~~ ~
b
.~~~ ~
rl-l~ ,~r- . , . 4 . '~,: .y.~.~„ ', '_.- ~ . . - .
~~ .. ~l
~ .., ..~~ ~ _.;,~`~~ ~ ~:
, ~~.
~ ` ~ -:~ :,~'
~ «..~:,~ ~. . ,. . ~,~,,,,~ ~„` + .~• ~,~,~~ :, .:;*~... . ~
~.~ - _ . _ . ,
~ " _ - _.~.,_...~. _ ~ :~;~~ ,
r}~ ~ ~~ ~~ ~ r ~~-,,; ~~
~> > ~ ~ E F z .~1R
~~~~~ ` ' "~ . i" ~v r~` ' ~ :
.~ ~s ,.b.~:c .
'1~ + . +~r' ~ . "a ~ ~~q '~,, ~ ~ ^ F ~~~+~ ,} .
i~ i'ei Y ~M1~. ~. i
-'1~~~ ~~Ar:,~ 'Yl S~~}S '~~ ~I~ ~;~Lie K r ~ IY } ~ ~f.. 4 ~ ;yrf~
~ ~~ ~~i~. - i ~~.,W,:.. ~ .'~`-.
! ,# ;~ -~~ ~~ ~~~ y'~'..~J .
'~ b.. ~ ~ I~~°~ ^ -^-' '~'4~.K~
~' ~i ` 'aY ~ •~ ~'l~.~•~I
:~? "y s' S~ s 11 4~ ~~' ~~~,r.,k ~?r~~.
~,~,~
r +~
~ ~ ~ y'f~; ~~ n :. ~ . dT • ~ .~,:
'~ f ~~7!' ~ °. y ~ ~~ ~~~•. ~ +r i ~.,.'~ K.i~ r'~~v~'',...
~~k ew. ~~ ~+` ~ ~' ' `~ ~ : . , . ~ Pa ,~` A ~ i,
~ hr., , y , *kZ , ~,
~"+, r. ~ ~ _} • ~ - f ! o ~ ~- ''. • . , ~-
~ tui~ '~' y' ~~ _ J . +c
~' ^ . ~ ~,~ ~ 1 C. ~ ~, 'J'r4 v . y, • r . . ~ " C r ~~,
~ ~~~~~ . ~_.
~„~ ~-' ,~•.'~~'' ~~ ~ i ~'~ • i *," ~
,~ .~; $ t . n r !'
~ t;ay ~~s;•~`'- jr~i~ u~ ;'gt ~s '' . ' ' f.,~' ~~ ~ .~.~I.
''~ i- j jr ,. Lk • r. ' ~~ L?~, i' D. s i: s`~
~~1~" ~+ }'':rS r ~ ,, ~ ~ . ~ r , • " ' ' . . ;,•. ~ t - , ,,~. "; ~
.. ~ 4 . ~ {ySy.
f _ y.~ , Py~ ~ ' ~ l . 1.. . 7 , _
y~~!fi ' ._ ~'. . .~ ,~~ .~: , a~i
~'r ~~. .. A A~, ~ a~_, . r - .b.; • .. ' ~.Qy9'..~ ,. ~
~'~F "p ~ .. 'jc ' ~; ~ j, ~. , r• a i f '',~• ' ' ~c ~'~'~~
~ ~~• ` t F'L js` , - ,, i1 ~ ' . ' - i. . f ,~,~ --~ , ~' S
.~I~ ~'c ,y'~ ^~.1 ~ . . y `rj, '~,''%' .~ i Y . ~' , ~ t ~~
~ ~ {• ~~ .! J f ~ ti ~ ~ ,w• ! • ~~-A~E t :~ y~a~ ~ Ae~ ~ .1 ~
. f r '` ~{3 `_ ! ~r .,~ . .7~ ~!K1~.. `
~ C~, »~ .
y' 1~-: 1. t ~• v~ t. • ' ~ f~ ~P~ {7,
. t. 4 + r ~, . ~~ , ~ a~ ~ ~ : j ..i.. •.R'y /! ~, ' ~ r' ~.~i *
~1 ~ ~t ; i et 7 ` ` . • ~f
1 ~r" ~ r \ r r a = ~ :.t: ~r • • '~
~8it~ t ~ _ ~! ~' ~ , ~ ~ .r '.~ ~ ~ ~~~ ~'~ T - ~ ~~ •~~'
j s`( { ,~. ~ c . ~ }! ,+`~.
.~ 5,f~h ~~ t. ~ • '~ t{ .. , t 7 ~ ~~' y
f•,l ~. ,,.~ c~ '~ '? '. < F 1 • • , ~- ;
r. a ~ j ~ . ~ - +- - T ~~ r ~ • - ~.
~~t t ~" . . . i ;r . . -i , ~ ~, ~ ~ f'~ ~t~'~- .`~
~.~L. ~~ Z r,` `, • , ~'~ • , y_ ~.r , ~ "; . ~
~ ~V'~~ ~ . . .. . ~1, ,. ~ • ria. •J 7 ,<l'}~y~
( ~' 'J • .. . '~~ ~ ~ ~ lr ..Y1 ~~ •
'. ~R J[.~~ • 1 ' r • • ' . ~ ~ ~"~ ~ fi V ~ti
y. Y~ ~~ , . •Id . ~ ~/1,.,
~ ~ . ~• ~ . . . . • , _ • •:l i. Y~ l + ~~ t
' y' w c.k ~. l., .' ~, ~ ~ .~C . •yi• `Yt5 7' r -+~ -~ ~.
~ ~ ~ • ~ ~'._..^ 7 ~~ t .)I ~ . . . ~ •~ ~ ~ ~^a ~ . ~.h
*~ ~ ..~~~~. Xr •~ ~~ •, ., f~ . . ~~1• ~• Y ~~
.;4, , • '... ,( FLa
- : ~, ~i'a' ;.• a ~ . , • . . ~ e ,' i',~
~ ~ ~ ~ ~ _ '^` ` ~* . ' . . l -~ , ~ ~ 1 i f~ ,
~ ~ .1~:.j~~~ 2 ~~ - , . ~ . t ~~- ~ ~ ~ , t.a ~ r,• 1-. . .
? . .' 7.'~~ ~ '~r"'~" . - ~ ~'"` ` ~ - ~ ~ ' - ` " .:~
Y i!~c 'iK ~~zt S~.'i.`~S' ~ .~~ 7 ~ . _ .. 1• , ^ ~..
~ Y ~` ~ ; ~ • ' , .: . • •• ~ r. •' t
1 ~~ x 4 ,~ .. . ~ . ,
s~~ ~ ~`~' ' ~ ~ ~ s '~ a .~. , S, r 1 ' r t.-
wn j~' *'"T•,i. ~•~:. '1 N ~,,p ~ '!~._ ,. • t r ~s.r .
~ '~ . ~ ~~ .' ~ t~ r ~. ' '.•" d '
' '~ '~~~ ' -~~. .iti: ~ y, ~57".~0 ^ '. ~ ' ' • '~_t'
-', t; ~ ~, : + - ~TM .~ f~ ~ ~. _ .:,cz` .1 ~ A ~ ~~ . T •' ; ` .. ` ',~
+~,Yl;n~~ '~~ . ~~• ~r ~~.C~'~ ~_ ,j . Y . ~ :t ~s K: r. ',~t
. i4. ^ ,~ r . ~ _ t~ ~~'Y ! a 1' .. • .
;1•~ . t~ ,± ~ . }
.'' -..~ _,L~~, '~, , ' ; .r'':,t.; '~'~` * ' ; , ... ' ., ~ , ;
'c~ ~°,~ '~"_~~~~~. t r C ' ~ ~~ i.
~ ~ . , « ,.~i
t , i ~ . . ., ~ •t~ .rr L ~
' ~ • '+ ~+, , i • ~ ' ,~ ~ 1 ! ~ ~~+.?,,' ; ~ ~ ~ :: ,,~ t i : t. : t• 'a
,~, 1{1 ~ ,'~+ ^ ~1. : y. : `y ~t« ~- ., ' ~ ,~ •' , -
~; ; . ~~;"., r . t ,,. •i .. : ~ +. .,,
_.t" ~" ~ ':i ~' ` s!~ • ,~• ,,, 1 • r~t~ yy~ i~ ~ ?i :
t ,
' ~~fi. o~~u .;. - t .Y~'~, r. .~ sl~~, ~ ,-\"'~" ~ ' 1;:,~ ,3, ^i ~ ~i` ~:~ '~r.
~.... {y, i ~I~.~ . 't •~f~ ~ C. ~ ~~f ' Nr~~'. ~~
, t _ ~y:~~ .. ~ ~y..? ~,,•-t t ~, ~ ~•~~ . . 1~• J ': ,t'3-c ,'L ~ ;~. ~;J i •
: ~,~+1~' ~ ! . ~ ~ ~ . d.
~, ~ly~s~ Z , ~~~. . •~ ~ e. `~ r ~ ~ ,.~k••' y.• .'~.~t
,~, ~j,b~~ k f ~ +. ~ ~ . • ~ • ~.~,gr .1 a ~:~^k . ' ` ~ ~ `4 ~
. , ~ . 4 M1 t.~ • ' ~ c , ~ ` ~ Ly ^,
.. . . ~{ ., . ~ . . \\ ~ . '4
~ .. ` ~ ' .~ ~ ~ ,
, ,
~: ~
_~ ~_, .__.~:'rii:~.._. _ _. . . . _ __e _
~ •
i~
y' (o S lee~c W E~~E~ To Sc,R-=~c,~. ~AS~~ G
~
January 19, 2009
~
,., i ~ f,l„ fi ~ ~;' . t' `
~ ' 1
E ~ ~` E , ~ .d .
~ ~, ~ b r , a~
r~~E ~ , (;~~_.
F, ~ ,
Alaska Oi1 and Gas Conservation Commissioii t ~ " ` ~ ~~ °` ~ ` ~ ~ ° ~ ~ ~~=`~~ r =_ `
Atm: '_Vlr. John Norman
333 West 7`h Ave., Suite 100
Anchorage, Alaska 99501
~ n
~ sr~?aP~ Cc~~-`~
i
• ~': l~i ~ ~ ~ ~
XTO Energy Inc.
200 North Loraine
SUlte g~~
Midland, Texas 79701
432-fiR2-$$73
RE: Sundry Well Operations Reports: Platform A Conductor & Surface Casing Repairs
Dear 1VIr. Norman,
Enclosed are Sundry Operations Reports (Form 10-404) for conductor and surface casing repairs recently
performed on XTO Energy Platform A in the Middle Ground Shoal Field of Cook Inlet, AK. All
conduc~or's on Platforms A& C were inspected using ultrasonic thickness measurements after production
personnel noticed a small area of bubbling paint and rust stains on the A32-11R conductor. Seven
conductors on Platform A were identified as having possible corrosion near the wellhead and flagged for
furth~r inspectimn. •The remaining conductors on Platform A and all conduciors on Flatform ~ appear to be
in good condition.
Grout that fills the annular space between the conductors and surface casings was chipped out on the seven
wells in question to determine the extent of corrosion. Some corrosion was found on the surface casings
and was repaired by welding patches or applying a composite material wrap. The annular space was refilled
with grout and a seal plate was welded to the top of the conductor to prevent corrosive materials from
entering at the surface.
Sundry i eports for four of the seven wells are included in this mailing. Of these four, only two, the A 11-12
and Al T-13RD2, required repairs to the surface casing. The A22-14LS and A42-14 were inspected with no
notable corrosion present. The Sundry Reports for the remaining three wells will be filed when repairs are
completed.
Please find attached the following information for your files:
1. Ultrasonic Thickness Inspectors Qualifications
2. Information on A+ pipe Wrap.
3. Photograph of Repaired and Seal Plated Conductor from Wellhead Deck
If you h~ve any questions ~r require additi~nal infarmation, piease contact rne at (432~ 62Q-6742.
S221C ~, ~
~ ~
~r~SE:~3
~~~~a~r~~~s E~~:~r~~~r
~'y; ~c~~,~ ~~~~~
r ~~y:~1 F~~~]
•
~~~~~~ ~~~~~~~ ~
~~~~~~~~~~~~~ ~~~~~~~ ~
Ntethad / Lev~[
__~
l~T-[l ~l~fir~~t~d - C~rrected !(€sian !
}ira~t Cert ~?~~~~ &f271s QQ7
iratic~r~ ~at~. 61'7l~t~1U
Edu~atior~ Sc~rnmar~r
; Forrnal ~duca:~on atfarned and c!atm~c `o~- quaifffcaf6a~r.
Educatia~ Location ~ ~~te V~~_.__
Lakes Hiqh Schaol Tacoma, Washingten ~ 6r197~,
, Nationaf Pof~technic Co~leQ~ Wilmina[on. GA ~s;'1990
; Fechnica( T~aining Surr~mary
Dcrcumentation exfsts which verifie~ thai .+he a~ove individual m,eets or~ exceed f,he qualificatic~;~ reqi,~ire .men~s, IA~"J ihe
; Y/ritten practice ofAcuren QCP-1. •
? Course Cor-~pany/Locatiort Date ~! FEours T~--
__ ;__. _.---~___ _.__.~.~ __ ~ ;
_ Uitrasoric Inspectio~~ P~~urtl~em Polvtechnie ColleGe'CQ. 6f'i~qf7 '. 80
Tota6: 8(3
~ Vitork Exper~ence ~ ;
; The folfowing is a su,mrnary from vrhich th~ qualr~`ying work experience in the discrpline indicatecl above is claime~ f~;+ tne
; above individual ~ ~ i
Emplayer ! Position : From ~ ~a ~ Months I
ASIS ~ UT Technician I 4/1998 j 10/2000 ~ 30 ;
, CTI Rlaska UT Technician ~~11993 ! 3/1998 64 !
; Exarriination Results (70% Per Exam and 8D% Ov~era!! Average to Pass) -j
; Type Qate ~ Questions ~ C~rrect Scare ~
Gersera! 6i22/07 ~ 40 32 80
Specifc 6/27/07 30 28 ' 93 '
~~ Practica! ~
.- 612210? 10 ~.7 ~ °7 ~
~.,__e.._ ~~
CERTlFICATtON
E3ased on the a~~ve scsmmary of quaiifca~ions anc€ examirtati~~s rest~lts, f c~st~f~ that t~e ~tx~ve r~arr~~d
Endi~eEC~uaE rr~eets fh~ rsiinir~urr~ requiremertts for this method in accordance r~itho
Acuren C~AP, QCR-1 t`Wrett~n Rractice f~r the (~u~t~fiication and ~erti~c~tion
Q~ ~~~ ~~1 ~7~~~~i199.
_____.___ `_ ~ a~' _..___.._
FC~e n E. Remefe, Gomptiance ~-1lanager Date
l~Eote~ This certifi~atian is void on the iadicated Expiratian Date or upon terminatioi~ af curr~~at emgSnyrraerat, v.~hichev~r ~rect:rs
frst. Certificat@an ~xami~~tions aee on fiEe at Acuren l3S~k, ire., 7511 Kin~ Strse:; A.rschorag~, A4S 9959~, ~4p.Ses ~~ t!~e~e
exan~ir~atinns rnay be v~ewed by Acuren tiients upan written request.
r~
~.r
E:
~~~
~
~
A~
~
~
~
~
~ ~
;ti, ,
~ ~~~~
~ Y lN~ ~ '
f.. 4 ,:.~"~i
£'
i """n
a~z
~;r`
~
~
~
d ~
~
,
~
~
~
~
~~ ~ ~
O ~, ° ~
~ ~J'
~
~ (~ ~
~ `°
~
~
~ ~
~ ~ ~
~a v° ~
O~
~ ~ ~
~ ~
~
CT
Q~ ~ . ~
~ ~
~ ~
~ ~ ~ ~ ~
~
9RVr
'~A ~ ~9
' '~L ~ p,~~,.
~ ~
~ ~ ~ b
~
~
o
0 ~ ~
~ ~
°,~
v's
°~
~
~.
\°~ '~°
~ ~
~`a~a
~
~
~
~ ~
~
~ ~ %
"7 0
~
t
~ P\
~~
~
~
~~
~
~
~-.>
~
~.
~~4
n
~.-°
~
~
~.
~~
I
~~
~~ '
z
~
d
U
S
~
~
~
~
~
~
~
~
~
~
~
~
U
z
~
~.
Q
U
L
~ ~
~ ~
U
f~
c' ~ ~
~ ~_
~ ~ ~u
~ :r:i ~
~~~ ~
Lt't L,'
^_
~
Pipe 4Y;2p A+ °h'rap
~
l; 18; U° 2:32 FN,
A+ Wl'apY" ~ Tvpical Mnlica6on Procedure i Soocs ~ FAQs ~ More Pksl ~
Ai Wrzp (Plti'Ar~; i: u~ec Ic reh2bilii~te G.O.T
!Egui2;ed p~peline. P'tivAF wg!k5 as 2 corrOCien
barrier/isoistor, i~ app,irxblF: on web'tlry surfaces, is
:uroCie, strerg, perr~2neat, cost-e+fe~tive ~nd
rESfires pipe tc cric~iria! e*.re~gti Ir our recert
e,noineering repcrt by St*ess Eng:reenng- th~~.
<~~ste^ is aic:ve ave:age ir> ex`~enCinc the l fe n`: hich
~~ess~re pas 1 e~,sm ssinn F~peiir,e.
n; 4V*sp {PI+VA?; is a hiQt~ strer.gtt: piping
-crr.FC~at;er •~~r~,p c~r,sisi:r,c nFpm~~:etzrv 6ia;:s fbF:r
rein'rrcernea; tab~c t~~a; is ?ac.cry• i~ipregoared w;lh
d.~~r'.^,'e mo?st, re cu•e: Pc!yurei~:are 'WGII; res:ns
~+ ~~~,.
A 41. CtT`t ~ ~ ._ .
~
i
~• ~ ~ ~.~.;.
- . .. . _ .
CT^ ~I~:E Cn_ c
: ~ ~n,(
.
~h.i., vr ~ ~ 1 ~
~` ~
j"~,", f-Y G,,
pip~r~y 4
'~ ~
j' ~
~
~ ' , `.~;.
f'~~,
EmEd~6rv
~,
~ ~ /
;;•
1
~
,!, ~r ~ ~~ ~~ .
~
E {L;CO"! E.'7~ '~
~ ~ ~ ~ ~
~
r ~:c r
~ y .
.,ti,'~~.
I
:
~
'
' -
..
rn~
F
f-
; ~
i~
-
~ ,,
.r
_..~
~.'F) ~~F. (..r ~
~_ ' ~
,
,. _
•~
~ePiar,emnnt ~ .y,~
_
t , .~ ~ ~ize ~~
~ ~ . ~ ~ °
i~}
'
,,l(~~6,
,3L~~~ _ ,
,
(;L:r~t'~L'C1c'C Cf
~;*ly' R78{DI.BI, i!' :d' y ShE{?3` : ~ Cd;n.r~CC18 tiUf1 It1C~J04;G @'~.~7Clv:. f'IB'1!~'•C~£, ~P.CC !t:Gl'4'Bt'S Cr
!: t!`. f1~.
.. c1~~•r~.r. i:. p.r t:F,cie:~~:t e~crnoe~~.~ic:ai. ain~pic ic usF, ~iie!nu:i~~e L: s~vevr~s. ne.!r.ir:.~~ ., ;;.pe
_., z r,•,~ C+,e-rra' -cs'~-.t, r~cri;c~c~c:r,o 2nc fen,Ge.at,;re res:;-i:;, t}t- ~."r.~; ;~
, . ~ . -cc~.ct5 ccr55`:;:iy ; gF~! ;~ ~,~.-,ErccS oar:E;c ... , ii~tinr,~ wc~r;dvrict..
A~;: i caf~cr c` t~,et ~tr;.C 'e ;u'~es ~~e s;:etia~ tue~'s FriC c~.~- 6e EG~Y'~6a o~. ~~.et c~r C+ j
.. r`arE~.a~, . i. Cmz;; btei'i~ ur?di.• vrtrte~ F,~ ;.F.' ~s~u~i a4L:~ n•~•~e ,'. ^vit' it•~c+oi ,. ~ CE"~;
2$!1:.'P.:; 2S^ 8i:t:U:dll' C:d~;C~'~~iZ'~e ~'::C:' KI'L'Ph••• ejt'12fi:B•tik'R,'f:P. "1blF".Ff~'S :'~.~lryru..:
. ,:cc~ f'!._ r:;e!'L~i.t._.~.uE,,- y~.~~,~.Pq.GE'£:'f9l'~I~' Fi:'t'~.^I('~f(Nr:•1.[1...~.lPii . ,...
...."+('. .'~f) :i'"A.F~F,~.I",F "i,r:~.:"f,~..
- ".C; V:'~~: F!',"~ i~-r, G'.'~.L'F~.
: 4~p ~. ' ~ ~~
^~K~ :y
,;,, ~., ; ~'",<<E p;c~E F ~ ~ .,; . : ,,~~;
Sii E Nf,f'
,:~, ~~7 P1PE-Fla
• Pipa WfaD
• q+ WraD
• Pioe Sock
• Solash Garsi
• Gen Wrap
oxies
• Order Form
• Feld Reoorts
• ~o fa . .
s Nome
CGck hers ui!~;; ua tc
_ ~.,c', ~.~rt:.
TYPlCAL APPLICATION PROCEDURE
r~
i •
~:s=~..s - ~.t ~a~<wc,
Pipe(~ne ReinforcemenLRemeciabon
fi ~ I t -.
~ ; .. ~ ~.
~ .,.~ i ...
".a~:. - . . s?€33'w•~r•:•nx~ i:;: ::i:'~. ::;
~,~t~~~.~ a~~. . _~ :;`y.:: ~.
. ~ ,i't.:y,'...~
~. F~E.sra.; r~ y.',~G:.~„c :<-::tu r..::.urx~ ,~ i_t-r- E r~c'n'<.~,:~rs~~ ~,;~,~~-,r;~,iz,
~f thYi~ •A`::L~! C." ~Y ct:,~Y' i*: z~~i4:7'1`nr'e~:'~ ir :~'nF~ ":i'LFS9v: ~~,
2. ~yF~.y .:,-.;xrn;r~,::;~ r~e; :vr. f€.~ ~-: ~kr~;, ~.:z*~s ~qt ~:~ iv c~~:i~.:t:~~.. ~^•r~ :r~~;•a~ ~~3
3. :'it: y:H.'!:!'-. !'~'f~.~~''.T' l:F^,I~: j L+':Y C•'ri• ."~'4 ~.i'iT: .
4. ',~;r:,~..'r i+:ilY~S;;.!:t:"rY',4~i~: ~~~s ~rzt?~;;rr~Yr~?1;um~ i~ ts~:~iar~?.
5. `~':ta, ::r.rr=,:rc`s~ '•fl~`4;~, ;,k~f ~r-u:. ~c ~ve v~r~r.::. rmc.
SPECIACA7t0lVS
Material ~ts=;s::• ~a;~,Awt<;?''?xt,.rcr'7~r~;z;<a:
C.OIOf i t~*~~'u~t i'rY. (~T~Yf+t,E• ~':T aN:
SnearModWus °E~,~;9r,~s r`wSFt~?i~x~3i`a-;
Te~sile Modulus ;3:: °. a. ~;r'°Fsr ~'ThD ~~.<..•x
Ta~sile Stren9th ~". F?e'~ ~a PS~'TA? ~::.~?;
FlexuralModulus ~.~r..^„~~s~ A,~u ;rr?&
Thermal Expansion '.~.;~ ;1, ,.~~`~ R;;~t~t. F.F.~:"
Ply'Thidcnesa :i? S-ecfi~: j~'i n:e:;;
Poissons Ratlo '~ := i ,~.-~z,~ ~.~~
Dieledr)c Strength tr:~r; ~ctxr,!c:z3i':.g u~.'at^ ~ sc-~t~i
'
s
t{i;xSS~ w}'~;,t
~ry• Onentabon P',-~ ~,.A!: ; >,,,e t` :_,~.. ,?;, ~
1Noricmg Time <'~' r.~ ci: ;~ Zr :;i.UT
~~:~t~~~zi's:1r.4~t a•u..-rr ~e+imsrf;:
se~ r~ ^ ~;~
Cure Time ~ a'~u~*r •;!J~
Pnmar Lap Shear ~~;t? };;<~ ~';,,STk ~fi;f o-
Load per ply per mch for 20
ygB~+f~lB dBSiglfB '"t"" F,~ u~ :n~:
i?t'.:':~.FF3'l11Li:.Tt1'4ftR7.:P.~. ~lw~~lt ?..}~i:?k~:. La".:c~:!'~c..G, :''E i~~:.
Chemcel Resistance :~ :_",~'-.'t~Ct.
i. ~~;r~a~'k: "~s't ~ •, ,cti<i•z~~','?
L!'M! ~".F:i+f 3m:.'k~'xt-'C7 SSC•..ND°.^.- iSta"- ' Ti~,."= i ~i1.'t:L 'N~:~Li ti
Sh¢If L~le }x.a. s„ ra*t jr.sn.'.1ure~9. Ik "i't c,.=.;e ~' g'lti:-.. .,
t>~+-rriuz:
4's.;'1ff1L- Y~CK'.~ :JF.'-57'd.'S:.!ltv'.
~;1~:'vr7K?f(:^.'Ii.L~~T..[:.T~G7:IY"tL'fk~i^ u..,7}et::?%(,'^?'j.
Gatle Comphance f in'~ ~';;1L y~' 'l.: NL ;i 3TSi s~ n5i .
LT;•'I:~. ~F~ ~` .f4 H 1 ~~.1x-: 4'IF. T~.~1i !. ''".?. ~.r. ~:~•C;f , ~;r
FI~1;1 F3; 4G^•.cEl3?'f.:rt:;~ti1'
AviBHb1E$1Z@e ~,~`~1•~iy~'si' ,T' ~ ii.'
,;:t:'~4".~ a'~;'..
,'~n!'S::.'~: ~' x ~~,~,
i':;J."vT~L?fi? ;6•. ~{~~
~'ir'."v~'t-is~ h~ k•~j~
P1tiA?'t'_i) 6 •.:;p
P',;r".~'f-i:i' i;' i E•(1
.vY:....~.Uirr~~, ~.Tt.•....(~;..~.~~}•~.,p.r'!rl
~; ~~±c~:! z _~
~
~t ~~~ - ~- v~-rL~
•
F ...~`:x ... . , ur....
„ ~' ~_.. '~ f...
r^v.;~p,..n~.,; ~a;:.,E;,rtr
r ~.'~'. .`.y~~' i l a" :~~.}'
~3'.,..:~,z;.w ~~. t!"i a'.4' i~'~ X i 1'i
~','s;?~.A^23C ":~`x :.,
~~v..'r;r.'1~;L ?i„:5:~:.r:
1~S'r.Tr7~S~ ,.'x~.~
xi°,*,~~F^2^.eD ,_'. z "~M
'.r.~~r7C`~~,~FiF ~~.eir~i~ :C3 ar~t a~.'~'~a~,~~~r n_iv~c'E~~ tr: cc._tti-u~ ;~cF: w,Y~? 2:I Es ~~ ~~'- I~t."a~.
~£~R=;i:'Y~it;';it~ 9S C'~i8!'2;5.
FrequenHy Aaked Questbnr
(~ ~oes the Aa Vdra`~ S~4steeza ma~i ih,~ ; equiremerrts oi t33e D,t7.7 ;'
A ~'E:` f}',E }\= ~'u"Sr fif9~E~'.i3 ~PBS ~JE'Ef",~ ~}10Ri'.t0~i!y' (ES~k3L~ iL E,1~"J*8 ~t'i1u1.~fL'~E~I:Y
t:!1C1t Ec.~.t7G fYlE?;?tUCi L'~ftL iLiat;i'~'i 17o'~'f.. ~.'E~E'i !'iL'i i~E tES'~.~G'?i^:i7~ES, :~:~;i ~iL`i
;r;? ed' ...^ns ~ ~~ ,, .~}anri'..~.•:,1sv~sn~ta~c i~L~si; cyc. ~'iG4€ 2F,.;di~
r.'is; c, crae~iz.n~ d~n#esa;i~a~a*;s.7'he dp~:°cva; fi~r;!se a`com,es ~e ter:~ yat~:,^;,;
jc: if? ;;7E i2..^,1.!.'J~4~ ~.'G~.~i ?£IF~SE~ Gs ui£~ FEuE!'Si f'SE'Qi5$iY. ..
~ iJnrier~wha9 ta~tlcros may A~~charrica3ty ap~lSei9 aprnposi3e map m~teti~r9 b~
usad iar pipe~in~ ~e#sairs bq 4~aa.&2(t~}?
A~~se `>£:7 i.IS~ r;' FJ~ec~ta:~i ,al!Y` AF~!ied Lomecs?tc t~;aissr~ i`:i' ~;. cr r~~tiir~a
R~pair.. ~?'?~ . i. is ih~ ~~~,7?an o' i'^~ cn~rsm t'se t~ai;± t;s r,n+; pr ct~~.~^~ fc tnka t^,~:
~ipclin~ aLto;scrv`r;.s, ncn-!sa?~in~ coT{oeee areas nia3 be re~air~d by~s
iris:allat:~r, ~*n rrteut~anit;~ily apu~ied ~.~*rpCti~?e r;z,ten~ai u~rap >c r,> >;cr;'e L~i~
~pt^~.13n~ ',~a>r ar,~;..:!:y 7~y?ie.c vo~ny~esile r. Uteria! ur~=.; ,~s,v be ,+.~-d r rnv~ f ii r.,t:i
Ce= _r c'tc ,n~.~ ,a ~t;~~ m~lt~adsaxe ~:rcvsn'-~ 1re init,~n~.~ .,e~,~F>s. ~ ~.~ ~~5e~r ~is
.~~1.~:~:.~£~d G'ir::d Sn°Pii'~?7 ,us~~i;~Frt. t}?Df:i,?C;;;2 ~B~~R3E~? Y L"air8v „€`fr.~r;rf~ !5 z:
~E'r;L'i 'F f1t:~.--1 r fti' :.'Sf .'FS CT...,~,i','; ~.^.!, F~c!i.f>£'u aG~ ~:.~._I~L'u i"111i`.'l i :.: ~;.
-~3~1i C'c..~ :~f7i ~i f. L ..., .. }~.. Jt~. f t i ~ ~a:f1-4` w ..~ `.&` ..~~ ..'1~ :::~ F , i .Gct~ i ,.
r ,. ~ .,_~ :~;E•.
Q Y4'hen v:il';.ASfiiIL- ~ PL:~-2 c:~~e spEet'ir,alt~~ fisf Slae use of c:?n~os~e re7~3r
~sy~ tty??j~?
A ~ve:, . . . :
4~;`lta: is 11~~ l 1s'rxa.~: Ri;~k~i~ S;y'~f~rr?
A ,as-t >>_ ~,~.,~ ~;.'ys,E..,~zr' ..ca~te v~~:~ir< .tE c~r~~._;;;~s
s"!E'EY L~;4R~F .,I~fL~ IG T~Li~""~.ErC+r ~} 7E.y+,?1;7 i JC$&.-~~~~ t~#'#~..:.._ c...51 ., ..tF(. ~;;'. GY 'lE E,.
., . u~ fi. ~:L~Yc ;Ye' ~ _ ~ t ~.,r tdE; ~..,; ar~u cc-_ ~,r'.~. rt~ : w.>te t ,.r,;~.r .t. t:°~
,,,.
, , ~1f .. _ {~ .x~`t~ . ~, ;a `a: €..~r., ~.
';~ Cr;~..,~_ cTf -19n~ 2 ,~ ~C.~L,,..t}~.3,?B h c ~'9P C ic~c m ,~e ~,_1
~,.'~."4 C-~.:~~i. .~',_.?:F~?, s.i.~. c.~i+. -~tt.£. ,.F:':-.. i c. .,. Y a, ,.'.~z _..t.: ,
.,_ . ' F :}• t~ t. .. ~ .., , f ,.+! w;:f:£ i .. t`:I„c ~
~~'.~^~i~,• Ci Y~.~ ~.ir. F+~~Y~:'F?.}7 RC{YU'.r.C,) 4.Vi=,'r.'."r'%
~ .. ,a ~.:.~~ t.' " :.t. ~..,....,_ .. . ,. ~. , ... _ . ,.:. ......
,.. . _ Y' .-. ,. _,. _.. ..~ .. ._ "
. ~
_., ~ . . , ti _4 a ri .__ '- ,~ - ~
~~ x. , _. .;'.,4'`E f r>~.'~~ ...z t ~.N'C:~:
~ . < , _ . _. . . _..; [~ -~'.
lllhi'~=' 2:32
.i'~.t::k' :':: ...
~
~~~s~; _ ,a_.>~.~a~
s
. ... .,._ .. ~.,._. .~~~ ~ _ , „, ;f {..w ._. ._
~, ~ ~ ~,_ , ._ ~~z..
,~ s" .... } ~.P,i^..,.:L.
~,
. ~.. . , ..~ A.,.~} . :c~.. . k € C;:rrc l~S'. ~-Y'1.?' .~s_t ,s,- ;s f.'i G 7;:i~
.
. ..;.. r ._.
€-u-, i..,~. .<=, .~~ ~3,n57 W ~ sTi .~'S ~ ~ c.,.C ."°. . .
. . ~ , , . .,a ~. ~ j,. ~t . . .._ . •~+ . . ..
. , ~ . s~?F.t i, S:7I;..Ls „ s ...
~~`.'°.~.~ a Sy~ve~ t*! ¢~cp(krt~ t~FTi c~ cxir ~:~ ~re~er~ei ~~y ~~^ 1~Wr~t~ ;
A, ~:Ex ~..,cl :_ fi~~:* .;:'~F r,,~t ...,.. s..~ ~~.: t.,~! r~i~ l ~;i E,t ~;x_~: -~ ~.,,x
_;i'a'i ~~"ac•3:;:
sf+~.*z°L'.E'ef'f.iif#FP~G~C'.:c,K<..~.ase.ct{f.Y~.W",L~~{.~.::.z~~..ICr~,~~:.w.us ~~.ti~~'..'t..s.~
..: ~ t .`'C'.'v, :'?'Y!7fi.+t2~i-.
=,: €' s .~~.. ~>~,. , ~ ~n ;~e hs,~, :.~ .- ^r :~:t, ~•~ c a .. ,,., .
.'rac. ... ~e~"~.' L`F~.<:ac'A4 :" :d:.,,?j~ 4rF' c'Tf iii",:°sF_'..
~~r,.,...J~:~y.Et~.;7?vr..~4a:i`..r.} ct-,r~'i,~4 ~~,~zsP:c k .eu°$-:''iE" a °%r;'•lY,*t i.>r~r..
fr; ~~F' :":z:, ~R iE t":;'k~?. A k. g~.:i~..r:.£'~ c's'.~ i:: .kfJ("1~ '~Yi.'f !7 pr..,'. ~?:YC ~£; 4 i~~4k 2*';::'~
~..a,.E,~ti~-.,~ slu.;i~,~~~r*~~ .~.dr~~ ~ ce,~'r',~~~_
Q~3'?aat t3 ~~ ~t dr.4~~s xaxs~ Tat~ ?v t+e ~~~~tr a:2i ~vrE'h .0.a '~tz;*~, ~
~'.,. ~. rs,sz:~ s,• s?~r~? ~tss~ l~r~ as;c>a~ s,r~,~",+~f IL~~,
Q S?Ih:e3 t~7a~as ~f'1~s3vact R,;~~t Y~e~>.s ~3rc?s#iacY~z d r~~ 3i~~* ~+~ tiYiae~~'~.!~lkn, f
A y, s iz.~iii: c<': ,E ~.. .~~?~:~T• ~s33€'~'; t;a: ~Seit: ct^~::u'L~e~ Cw u..< <+ . cfi.~~,.;::3~ `ir~..
'~~? ~'.;;-~:~~ercet£~tr°~ ^^~2~t>~~es'~+,tr, ;~± "j~f~~^xc+'~_. i;}t; ~~:.5~,-,
~irr~ c .r.,: ~: u ~ . ~Y~1i~,i ~.rr.~tr;~! r,.si~:..~s~ ~ c ~ ,-'t'~'~~ ~`t! t c ~_-~' i LL r,-~~,,c,, .
.~~w. a_tx~.n ;~E~~~U'~z~t'~sKZ u.:~~,~{, t;. rrE~ ;~ ~Yar ~ .ir ~ .. __
...:re i ~ .' t Y ~~.';kr._ w v+..'LS~ s~ r . ;, u: .1; u:,r ~ z~C7i~.4 ~...~ , --.i3 ,..., : x .,... ..
~.z'..,n-_s,.Y= .~r..~F~:t'c..4n:~<~r~fns_T...vE~..s="£._~,~'t~r. r.<<.. € _~._
;.:~z: Y~..;_~~r ~.~ ~,x.rr~~oir... ~i, *--' , ,~_.
(2 F7;sa tin.ra; kse~,a ,u?~~ i:t:~a;2in~ ~~3#st f,~'3iox~: ur?tfr>i s,~btn: 1~.~:c~ia.;~ ~sx r~nz~o
e~z;~cii„ic~~~?
A ~,~t~,_ J~tr ..t~ »,~.. s`;<t~;;x , ~, ~~~~~r .a _ : x t,_
._ ..~c~,. .ai,'~:y .a~'f..~:. = $ r...~v>'v...d „~':ri.- `ti =ElTF_ ~ F. ~ i~ #-~',`i7k . ~ S,-z,.
s3~;.~M.., t:rx: }7>j e' ~. ~..,a:.~? ,Sir tiw.i:,:, Y t . , .:~'.~- t .. ~ia.c r-fy .1:?:. .~~ Y.t:~.~;, ~ '; ';
_ . . ! ` .E .£~,. . .. l~ . ~ R ; = Y ~ :s ,T''S , f'-e _'. _ e ... .. i
. .„ :
..n. i~ ~ . ~-.. _
;.;:'f . f S'd: t7 .. i: ~~'! Y': F~: ~
Q l 2? e-t a~r¢ c~trtae ratiitrr} ~Fmi: us, 4ite ~'.-~ ~Yi-ap 5y~:;~,r.z'=
A ~ . ~ t r ~ ; ~. _ . ~r~ '~~, x s ,. ~ .. ,~ _ ~,* .z~ Ur,.: __ _ ~ ;. ~~.
s ~:-r j _,x ... .., t :.:.tv--r , ~ ~ ?r? 1 _. ~ i ~:: . . :T~;:t. . _ G.'t~t `:` . _:.
.. .,... . y 5 :,. . 2~ >. ~_..',E . _ ~ ~:~ ti''f ., .s.., .. _. . . . , e _ _ ~
a _., _...e , ~.:._ . ~L.S;. ._ e v,. , .. ":, rt , rr;c-. T, a .....1~'.
Q k;:.i.~. r,z~::~t,i- i~+~ltiz~~.~' A~e~r~~r zy5~ ~,.,_ t.~^cr ..itS.zi rb F:E ,..,y r,Y~f,. i~`r,
~ _' , .... .rz.-:iV :E .~.~:i~ ..e:t.f ... - ._ . _. .,. t`4t . .
.._ . l; r 4'~~,...-.<.,...:E'. r- +~ .E . .;( ..~
. „
, .«.,. ,.. ~
,.. '.,._ ..~ '.'~~.t £ ...,.. >.,.. ~,.._
. _ . ,,. .~. , k~. .,. , ... _ ._. .. ,_.
_~
. ~r . f : ,.~ ~
. . . , .......,. ,. r 1 _ __ ,L .,,~ ;.._ E -_
` ~-'_
i~ V{,,.. .. - ~ tr ~ _'! Cf k ~ r ~~~ > i# i i . , ~: t e ~~:ti . . _
~. . • . ~ - ~ , . .,_ ..' ~.. . , .. . . . _ , ._ . .
'
. . . ...: .. . .. .i. .~ . } .:.:; .. ... ~ - : „ ..:. ~ - ..,~.
~;;~~,~v~ z:~L
j iv
~
~~ w~a~ - n; w~a~
~
va .~,~,~,~f~r i.s=G~m..,:!. are.l.l.n .,.are. ~~' t~fss nse r'5~.;-` Y,r.,;,~~~ :cn~
'~;nt, ~~; oes,r,c cr ^~ .r^!;,~r o~ N.t:Cc #3, ~r. i+~;`; C; T~ ~ ~as :d~~- c~ i .;~te
c~-,~ : „~~;r, P- ~~r-~r ~.: r3e 3:.Q~ ~~ ar~ss dF 5r~=~tT-~ . ,:~. -r~ ~~;~v •.~ :r^t~
£!t~ ~e~'!6 2~'s'o2 z+'afi`s•' ac#,`r i=l #`at: :'c:!7~}^,e:S;f£' d~ev~±.'..
Q np you hati e an engirieering analYSis t~,{ o~ sa~fvaart 3or a~tarminina i4 &+ Wrap
~s a suitat~le rnethod o# r~pair{i.e. waii lcass, surtace area defe&t, efc.} ~
~ Yes; e, sir~iEe 'c~,i:ai22u?"is aueila~'~ io es:ermsnc; t!?e sui~t,i;;ty ar.d tt;e ,ac~it~d
^umbero` 3eyers fior tn e*~c'ik~e F~erm2nenf re~air. Sta~~d2rC irp~ 4~ ~rc r~qui^c:~ {i;e.
~:~in~ dlamr-te~, vral! t'fsc?c>xa9s, pipe gr2de, defestax.~s;ler~~tS~, ~e~:s7 ce,~Y~:, et4.,
Q Is ih~ A+ Wrap 5ysiem resis3ant tsa corrosion or atmospheric de~radaiipn? YJha4
caatings are recommend~d fiar pro3ectian oT the repair sleeve?
A Yes,A+ iNcap S~SCern ha& ~~~ inhabite~ i;i the resir, ~irm~~a~.?n~ but an
ap~?icaiicn rPCUire^,e.rf is i'~aS ar ex;e;r,a! p~t~c~ivee ~afir.g ;~ raquirYd re~a d(r~ss
'cr b~tr~ b;sriec and ebcve-g?nund c~ncitior,s. As #c a rsr,cmmsnded ~°atir~, nn
specific casiirg is recomrienc~sd and ery rnay tae ;~see as 3on~ as t~?~ ;.~ating is
opaqve and wtii ~at,nd f~ cempcsile materia~.
~ Are there Tmaining Requiremanls fa.* Installing t4~ Aa ilirap system?
A ves, the R-~ Ll~rap Syster rnay a~fy be insta!3ed by T*ained Pers ,nn~i.
ievel 1 Ins~i,er: ~rai„ed in the ~=ieib by Pipe Vira~ ~:l..C. P~rscnrae~ c~r i:e~f`ied
Tr2iners. ?nis ?evei of fia+n9nc pri~v;clee s3eu fic aKip;icatinr, te~r,ici.e an:t gener2l
produGi k~owfe~g~
Levtii 2 ins~lier: ~-1;2 day coursa {ci~ssroam b'r~and.~n} e;tiarat the Customa*'s c;
i'ipe Wrap L.L_G. FaGlity. Tl-;is ~evel of traininp ~rovidES apgiica6cr, ~c:t;'.^,n,wvE~ ~r 2+I
sc~:nari*:~ ar,d ~crough p~duc; knowte~gr-,.
Tralner: 3 day c~aurse (~las.sroom E~ hat,cs-c~.^.1 Eit~eta! tY~e Gus!orne;`~ er F°ipe b1'ra~;
i..l,_C. Fa::iiily.'£nis leue? of h~inir~r prcvices ap~ii:z~or. 1e~fin~ques ~cr~;;! s••.;enarios:
~~c~c eh ~~rccu~ knowledge, usc o`eneinsr.-i~G z~~,!ys~s~ ~r.`Ma m e;c :i?i
*~ci a,.~.i.ii?i~~iullyrLa?iuectcalnt,oi'~i°~i a ~:~'!*.f~1:'~';a.rFrs;s.eyst~r~;.
(~ ~~he Ger#ifiir~3ia:~ applicable iw o#J7e~ vraief•~s:,i~ated s~stems'%
~ Yes h.,r~iy: . reviYw n"F,e ~pp`i~pen ste~~ c~'?~oioES ~.~~ the ,.p.::,,,r;:^
fEa~~r,aai!t; ~~e ~fe~ ?or fi* 6t'rep ~/ster,~.l~s e m~n;rr~~;:;^ i~;E :~s~aiar~ ar'rai~~e~ t~k i
-cC i'~r A+ ~"~! ~ p~,r;n,~ be~ p~ss r~ v r, e~_F ~t t, e.^:~;a e~..~c e7r.~cr' ' itr,;-, ~ a r~~
.~t... t~_, ~ ,..,ue ~i.s _e!-~c~v~,' c ~~~, <~ac~ .; :~rfd~f ~ e,.,a ztr . _~~-~~ + „ .
e;,.~~.
Q£3ear.a sc~~rsacr~~ is p~o~rly x!~aintel ar~ti Ce~ifiitc~, Paewlong cls~c s, f'-re C.ertiiicatic~,~~
iasi %
A, ;Cscr,.s;. ..~.~~IGr. -'~t .~*._`~f. ! . -~;~„ ?'; ~s~G~ •cn. ~~e ~ t _ , ,z ru_
~,e::rat!,'<_ ,^.s?~aliaior.
l~~..C~.~t.. , r, ~~ ~ l'~in ~'t .._,., . ..{.,~ G,'F , , e :,, :,t=`.. .. ,..~ ....
Y F~•~;s- } E , cJ7", - . . . ~
~ yYa;;~= is met;~r. :~; "verifiat~4a~ ir,stall~,#;x~r: o• fr;;~i~r" %
A re-... .. ._. ...,. , ~ R ~ . .. . . ~,r ~... ~ , . ,.. , , ~., _ .
..r. .. ... ~t,r.,... ...t.,. .r.',.t ..u. , ~ , .. ..".1~~",^-E ."E'~," .
,.: t.ri ..C. ~. ~.'t . ...'tc. ~# ...,t i .. . , l. !, C.;
S
. . t:'P~ :'f f ,. .. ~
(~f`:,'r~ TiC_~:e'!~,..:E.0~4.:u e~„f~"!;.€;15~iEL,tv:l+,. L~E~=^.4-3~. _:~':JS
~ rE:',-asir;4~tJi
f~. ~~ ": . ' . . _,. ... , . ,. . ,, .. .: ' ~ - ,. , e . <. , ....
- :.., . . , ..t . E:Xc , ~. . . , .. , . F'.~.~ . _. ...
1I38/(79 2:32
. . .... ~W"' i ~. ..F-~ . ~..
~ ~
y?t.<-~~ - >~+ GSr~G.
(~ 2~:P. v k~ :if:,2 != r 'rY.ita~; F2rcR~f~= ~=;y3.x .«,_ ~-i..; c ._ :,,:i;a~r ~v..,~er~~r.t tx..}~' ~.~° . ~: ~~
arisxru~~ ~}:stasna~°r
~
A ~`i . ...~._ _~.'~~fe~w r ~'~v'%r~ ~:.<r_~~ _~. _~ ~.~_ _._~._;i~ ., xo-e, ..~'s~,
t..5 _ ~„F'3E?3; AY `k:.":eCe..T,: cCk~•1'C~: _Y:+~c...... .''r.z.`:: ~.S u :'f:xs .. ~ .. .
~ .wC.~:~.s2f ~ ~Yf;i~:
... ..y
-.:w s . .. .. . . ~.... gt ~ i .c~.~ _`..'4.. i_ ;....;. ~ ,..., ~' .A'i-
: ~ .::5,.?~. ~..F-~~,,..c~ k...~.t e .>s,.. ~ ~.. c
:~-a T ~ ~ ~' .i}~=. ~w: ~~.~Sa.~_.. ~ ~w~_' x.I _.. E~.: k __ ~... ~s.:':'_
.. _ .. _. ._..r~7...-..`:E ......~...ts
_.C .75 ..aa '73tf>~2E'S!9i~"J~..T:.
rz f,-'~~:~.~. ~~,.~•,~ e~r .^.~:.:~ ~°~:. -~ :~:....'~~ f r~-~=~ . .s,nrx _.~? r.'t..
~ ... ~ :s, ~~..~.-~s_ ~*., `~ <'t .~.~ rs~ ~~.. r~~.?s .~ ~~,.~ ...,_
Q Na~ ~ 7~x A~ tt'~~u~ Fi~r~~i~+' ~ter,z chJ`f.~as za1 ~;+cr.= s11}Trr ~rd#~r ~.sva ~~n
r~rai~~sa.E~ ~'azsvur~ ay~'~rr+~ a
A"i;:~?;F.r.--,:~ ...~.}wif,`. aY'`4.hE'rr"a~~,,,~.~Cf , i.t~~.Y. 'E.IrS,S•; ~° i'Z%r;~:
..c...':£.5.+~`L4?~A~''FY.3`£~~.+~L`E:I~,'-.[?Yd'~.F:'b.1f.E"::"•:r'f,., .v,^`E~ ts~ °£.,i,:....
Y(; I.t }~ f'.?.. :~L' Yi~~Y~'~ k3 a.s"e3'L'~..~: ,. Ci.. , 3F:~?cc ,~ ` it.'.'r"*'e.:,~Ji._ .
i;~ sir-r.4- <'ra .ar>~:^z ..8:~z~~s,.x,..4t~u~:y ~ ;ir xi-Ska ~°,::~~i ;,..c~r~
.~~ ~ ,et._2.{~~':,"d~w•'f,tG~.`~a::"r 'h: ~r3~e:;.t c-T;,2.,":F. ~, a?:.~rrz*2.c. ~~,lc~,~E.,. c~.~„n~'.'G' .. .w;=:,
'1f.rC~,~:L.;„ ~1r~:E~'£f,'8'i~~S1EF~f,.,E~?...^.°r ~.kJ'L;.~j <.~i"ai~iiFntG1~`... y
::i: i-.~ :J~sa..~ ~ti:e.; ~:~s..s~? .r. .:;~.1, :5,.:~: ~ , ~.r~~ ~~E <~,;a~>t ~ E s,_;~~ ;^ E.
.. ~~MZ... T:~'~'~fs~;vf i2.`~. ~tc'j.,~:i.3:c"v~'...'t. Jc~:'rrf£ . . '.:w €.r`~=..§ s... `~,.< a.: .. t,s..,.. ..
~~m i_..~ : L;'s Y4 n"r~~:E'3 $ ESl ~y st '.,s'.3} 4 ";:~~?4.^',
~'`+.'.;i's"tk_s~r~"-~r^~.`r'~st;t.~;{:53~.'Tf'~~:SS~.:;:Ct,g"Yi'..£.F:9'ET ~~a:.i«;fP,~:~ld-fe,,~: ~=Gf.`9~~ .'~~`;
£-:ri -:~t:'FEi ~!:~}' ~.;.:L x~~°cR;'~,^~FES €+IFr C~t.r~c~ i',~riS ~a.. a~z.2Ef' rv'",~,~*.. '? "_~ . ~£~ ,i.~x v;K.(i~"fiW~..
(} 'r~~= ~s 3}sc= A+?~fra~ Rr~~q ,~'irys3rm ~~?fez~~rrt ~e ttr< E~g'sc~ c~m,~r~:a5?t~e alet~x'rrac~
ay39sn;~'~
A ;,- .~ .-.T ~;'~`. , : ,pa'7FS. r: s:rr#arn~~.,~, ::°cit ~ °s°a;ti_L> _~ e.a'~=., ~, ~.t~~:~~ i~,<.,;
Pi:~,.~ .,i;t'?E? zt '~;:'R'*.~"..";SY.~°ll,: }~£ ~. ~tiE'i Yt *,::f.~: ~a.[ J':i~a.. '~... _ .
.~ . 1'r~.` . ~,~ci-r. tz... r,Pv;.Y ._. E _.. ... a .,. : ~£-s .:'uS'r..,
,... $st.;..r , as ~#?:' iiy. .^ :, .. ::+~~r ~=. ..
_. a'~'l:l'-' ._f'G,R:, ,, sN...~'~.iF~<x...r('.Y } .--.. ..,._ , v.__....
. Tr: .. ,~l PJ,ck-.:_:-ff... .'F s_ ., t , <';,~ ~ T. ~ i;`" ,1 .~..'11. ~. . .. y ,~.
."-1~ s . ., .. "v ~-_,..[+~ET. 3hrF ~i~fL-'~ r. Fc. . ~, q ~_,. = Is.!d i _ iL~'-.
,~:.T.~t ,~.)..;F:Gt.. -4vYr, "c:5! ~ . <'?5~?~ s' t~; ~3rt , c~^i~ Ltp ai, ~,:c. i k~_i.; ~~,.FC,
, ° :T ....., . . ... ......
`.r~~ . .. _ ,. .. r: ,. _ 3, i,~"f; . S st; _ . . _ ., ... , . ~ G'.` ~
. .-. . . . . . .;~s. . .t ,.. . ,._ ~~~ ... .. . v~..-
_ _._ ~ .,z;T~" s L :'~t~w , ..a'~t ., k .
~=-,5"F ~.._ y .,~« ..
'~'., t_.6.-'i. .m. w , .. ~i . .,, i., ~... , ._,
..e.~ . <t;'.i . ~c':-..
f,'~,~ . ,,. ~rf-. , ;~~~.. ... ..si-* ~._~.;5 ,. _. .
a.' a F,. ."s~ r. . ..: z'C,i'~1.. w. !ri~d _ n , . -. .-_ _.. ._ . . :,?9 .. -_
~ i
.,. . . .. _ . „_. ...,..,. ,.....,`~~_ ._. :'L:_':' ,.,..
. .°~3 _..,?t::?L. ..,;St-~. i° 3.<r:. . ..,:_ E..''ix ..,, ,7s ,',:
_ ,...-"!.~L'... ~., ., r~,! .~...._ :. ~..
~' .. -_..vS'-.f5.-, ;~.,~. ;.E:., ' , .. __._,- . __. ._.
.._ v..'.Ea ,.t~S .c°
3~~r.r~.~a "i:3i
;r"i. E~. ~. `
~
!~lra p- A r 41'r ap
~
~ ~~?y <u ttie ~a i'.'rx;: Sy~ terrt ,'
[~ ':~ i Ec'~ -=;°~GCt' tc. ~ S3E ',.yi; G• ^7c4Er :..E r: . rei"-eE f. E,c:,?.:.'S ~L .i:- Ki~iG
Ce ,. ~site S e ~;~ ~} ~..;. ~. ?r~ ~4t , re, iu~,:2i rc.rfcr..c -~F~;: ek t~s tFy :`:e
~:hlS!C2i`'.RSi~t'i~`.~'EB~..o~:Ei,~rCrct`i~ .iF.i6. ~::c.~h~~:E ^-..^,SfiaaUr~iF,Su^,8~i
'~.&tE(i~IS BCJ~:ft: SE ~'£I~i;L`,t: £'.!'i3E.31 SUC~;: 2c et881 C`iC G' C' ~,.c,"5 2~'1,''i 2h£ ~;i+ ~Er' c~[)
8ystem.
~)7r e t~st c~ :~ "~aee E fec+'" ptec ia^~er;~ ~> Riaic Cc~r.~csiie'~y~ter;~ e,~a;~'e~ ~~f
s3~s~„ et~ h~~~ a r~:s2'ta.ar.7c^tc,_oE Y~~x!m2 ~v ~?Z"~c,<<ur~e~ U r~:~ a~at'~ec
u.;L,c;.~ta`!ec., i~ tF c s:z!c#;~ral ~nsar,:y a ~;E~ t.,air. AI`hc _~„~ t^~E sc- .,.u_c, i~tc^~'fi~ t~#
~e rep~it is r:c: ~n q~es;iaR, ih~ gap be*xeen uni'w .u;;fe t;e a t:"nt ~,r ~ cisture
;ngrc~s. t~,^,r~ cte~~'a: nin;z o? rnfi stc;~e iri~rPCS.•*.:E Fr, hert* r n et~rF~,;?~ e`~n
L~ Gr::,"2'!. CEi.
~)~FSe A- V4'r;: S~~sierr. dae€ nei typirziir ~,:`ii!ze "~E s~eng+,'t; a; ,. ~at~r~~1s p`e~nome~~
be;.su6e i~e sy'siem~ are designed SucF N~~: wnfnuCUS cGUe*ace c:` CsccJ;:+c* does
^ot tea~~e Faps; s:: ~esfi ooin:s c{ in#er!-s° ta- mo~sture in~-ese
Q What are tt,s naQ~t cornms~n mi.stakes ma~e durlrag the a~p:icati~,n pti?~e A+lhrap
5ys9em?
A". ) Ur,& ~.^,~mcn r~isieY,e n3zde dur;~a s~ a;;p;ic~i~o-: c`:~rF A- t'S7e~p .~',}:fen: is na't
a~, iyinfl e^~~:rh w.2iFr t~ the wraps. Eac~~ i~ fe, shc~id be s.;~~c;er,t~y "v~~iiY~" ~-it`~
wzter cu~i~g r~e ~ppli;,aticn. Ex.cess v/~t~r r:;;i nof;eop~rc;~ :n~ repa~r. A!! excess
waier wii! be ~'ied d;~r,rtg the tic":snin;,,: o`ezch iaye; a~ ;f i~ e~ p;i~c io t~e repair
~rea.
x;The ot~er ^,-~es?,cn?r:r„~r r~',s:~ke is c~s~ing i.p ~a p~c+~age ~~r t^e ;~~ai! skeeves
hefore i~e re~a?= is re.ady s ie made. The A+VYra~. sleeve are v;atr r-e~.i}aivd.
The prc:iucLS wiif E:x: a^! no~s:ur~ oui n` tt~~e air.
Q N~aw much sht~uld the A~ Wrap Repair extend beyond ihe repair area?
A?~T!~e use oit'~~.A- i?Jr~;: Sysie~r wi;i;cut~~~ P'ac ,e:;ct '~ i:e~eci~:.~,~e Tabs
sho~!d e~enr. ~ rs;.,imurr ot2' hc~yor~d botn site~ o`:he dEt~~.! Grf;a.
21 T!rE use ci ~~. R+ ~,'1r .~ ;,}~ste~~r k~ith fie tJ~ ~rr;.,ai!s Cefv;;t~=~ . T~,~-~
s^c ..,..,..a ,c, ~ ~~~~~ cr4" te o n::,-, s3 ~.~",s c Ef c, z:-erE.
, `Y.c _:~~ve E.. =tri6 °: .... , ..~v t~; E't L . ' C?'".,,ta,.E`1u1~~ _~ ' C~5't^'>.
Q l"Jha: is 4hc cc~-e linie afi"tix 1~+ Wrap Sysfem?
A~~`- "-- t` ~i r uxi~ta?e y.~C ,r; ;u,... ~: ~ hc . ~e„er:a _ f, tr: rf r'::re ~ is
re:a~, ,vr.F:e ; ,,, ~ .~unn ~ J ~...e: ~;t, ,.,~:. ~v._ ~~.'~a:: ~ c : re rt _a i ~~y
tcr'2~.~€ ._'_~f,. ._~r.~fe~~Er:<~~~.~~....:24~.~.s;.. `~as~..,rer~,r i,_ ,~:~ ~t~~~..
. ~-~r ._.:~ r^ ._ k.,~,csnr fi!`, cy e,z nc~:; ae _.k. tc. ~.~e i~+EC ~., .-ii z-, ~'r,
Q puring'the cure ~r~ esa. tFm R+ Vvr~ r- Re.r=~~r Sys=c^:s eee~n~ t.~e a_+?= ~r;,,.
A~e these aa~es haz~rtt~r~~7
~ tia:, c,.",t.::,... _: i:~.,c~~~s~rer,.~~.z-„,~e.yu~v!,en; ~~~ex? ~_.;..-.;~,e
K~2ic *?~:EC,:+IF..tG :~: G^,c =~...~r. r. :,ca rc ex~f ~ ..~. ._., . .., ti.}„ , ,. ~ ,,. `^-e~
4-r.E. ~}.i ,< , ~ ?G `( C"€?^~ C. ._\:0;7' iY 4a£ .i .. S ~S-. . ,.yt ,~~':~.
i ~
~ Sancf v~~it: is i.: t.. -.e acY~at~ thc c~-j_ir,~ tt a, r;_=tsr rl,; ~s ;F;... _,,.)y .~ ~.: _t~e
}~t~>n::;' saisov,~`,er~o!:~hlr,^
j4 ,_ . ~ ° f.', fssVe SW~T~. a_~ .. . ~. . ~v ... . ,~£: i . ._
~ ~,~., _.., ,..,.. _.: ~~ . ,.. -,. ~~ ~t~e~: , ._
.
, , - ..:, .... ,c.f€_' ^ . ... ..
~i'c.~x iS'~ . . ~. ;;~E~,_4u~e;;i ,....aC'-, t :r.;-r s.~.
~ e . ., . ._ .. '~.£t.~ .. ~ .... !.~ . ~. .
1 j i8±u9 2:32
•
•
~f ~~s~~ - „~ ~ad~
Q!s'~e J,»'N45~)~~ysls,n~ ~~rsx~pl`'.litE'tn mir~x~Txi,v! a9[ic}a: k s~eT aa.:7i~in~i~IC~gir.atty
~7:t~~Y;ccr~; ~t>*3us5or, ~~,9,tG ~;•
A/t~1 C:J.,~'; k."-+~K... ,} f~~.2'Tl..~a.. .7;.;."ls ~. P.h-~ Ft.E:Sx~`. il}Y.;/ F t.i t~I. ~~:` ~.11'Y•~:".'.'. j-'~K':,'v
'-'~ce ~" C!F~~z:~ti `r: h:iK' ~C"~ y i~.r T GJ "s?.')iF"~ttif: ~t'0~ ~I~~.~! ^p';K : L' ~i T iffF~ H i` WL~~ ti^SiF.'~ `.'. ri; ~.~
r, !~.. £„~a•r. ,"'c.,'^rFN.~'h~t:~.,1 ~~,u~:z c~::~-~':~nstv;i`6°t~ *"r};'1: t-,-„tS~s^ >.,~
Y~*~~ G°cw~r le~ ! t+qe; ta~:en r,r.'rtE-rrrr~~ ~:;;:;; fi~.:~',~:.rs ^~t~c~~:x:~E~ 5:.~-~s ~Yitw: cY~;:!ti~s~.-u~- ce~.rr ~~
s~ae.:~.t... ~: ~~-~{~u:. ys~A^. Ffi'~', ? arfi ~:~,x. ~. if^,.- LeNe, r eTro T-i~. Y... _ iR~ ~,sa. ~.~•c=. f^
~€~f.~?.~ 0;`.57~ YUr.Q~J?~ cY'.tt+C `IYi.LT.:r,1t.r,~;Li.iF:1'. L~ S~S'4+E 1'.i"re~'T'.r~£;17?': .'F,:b:>~~ "ii~ `:`:S.
~L~ i,:rc.r~;LSr,rr~,".~•e.l~:r...~a~~?;~~Lti~ ~x! _..n~s+~1,~s_:t .au s ~,~z,.h.~
cs: i ~t. ~;: F. C~_ Sxrc !~~ #~ ?;. i f t , ~ .::,tz~ c~n~~; ~.a~ :a::s r. r ~s• =a.! ~i.M ~•:2'~i i~rt
'o"~r~ ~k.i ~'ta ~~,rt•FT;~ Gi? £:~.':; t;'.:b~ .-,t&t'i~! tir. ~Y,~ .:~.~it:r S,•';c- Fk''rE sSrrxr`.~si~' ~•yL•~.lc: s:t,
,r..`:,<'.?~;i~ i ~;"1~::5:7 Sf;Y ~..)Y~2E' "E'1'. ~.'.&J'~i C~iLtE~ii
Q',Yhy ~ i: xi~~rle~pi .tr ss~V tk+~ r.r,Kis vt Ataa €~-+ N,trap ~#:e;:~:7
A ' F }an'3~.. :f.'~.}~..'Pv ~r ~rP}il'YK~ ~ , F:'•E,.'I .„t.f~it~~4)'~ , i~.~!.. `}+ 4 £c7c.' ...,
Q'iys~: i~ t}~s•;».npr~sa~ v~ )Jiv f'L~u~kic t;onsT~ivvt~~ ~h-ayl
A 7~trF,-i::Ti'f~nk:SJf'J~T~:e~r~ t~~L~E'G .~"i,::;::?rV'~2lr;d'1.^~E ~r^.:'b' ~c;'7FS.t+uf.~.=.,h`eY£~~.{'nn ~!re'L^'s'n~.T,?iF
>Li3f:~ 3?'t.' ~'t~7~~LN:S' 'yE1~65 v::it,t3: Lhi.~ ~e.r.'::•:s^..E. `'„sS+'-x~„e.
Q 1Yh.3 rr.tsKnxl ~+xpe cr~'tarig u; af~*rirrx~~dxr1lt>p~vNSC~ 13-1F fx<rre~~ icN aDriNs
~1c:zx~r. ~;~?
A 7TFY; J":`.'i; ~:'.'t:,:?;i:; TQ:~:[;R~rilETid;nSb+'s°C. in tE''E'tT:7F '~F.''aL.i yiJL' .~159'i'7t;r 7z,..,
i;; ~rn•~..•.tz~~e~~;~sia?1er1*:g~.- ~aya7,S~ysir,-r~',~.~nuesc';'a;r,nui~~~.-~ . ^cn~~~Rc:~
~~'315'wtiElT::lr:'!
F; % 5 nrt~ _a+ c~;;~ut,..
~:.'I ~ L-c:iS. Uu`::: `~L.': a:T')yt):.";i-.
~'Je ~ r~ s~ r~znintrrer~aTLV~:: ~u• ~, t~e~ ~~ 'ry;,x~ o:';.!Gb'~~a'Fr.~ jrr~4~ is;=~v :g=_:,
:::%,-a: tJr:r rx.~. s3s. ~ t~:a9 i`+e sasr~;;:_r, usg,r. ~ir dt•n+~ ~•u:nei a;~'.~'~:=urm ^~,=t trn~:~-
_ .~ i":??.;,i~r.T,: !L' ft ... ^.irAp. i , . ~ ~ssr r:tiE; G. ..~ S: CSk S:` _
23crs. sttr~ tlir areD7x:1 t,xcks~tx,~~cr ~of;he A+ VYrap:l~lur~vr svm{sxr~ tfl tsam: or
Q x1~~:1L~r;ye, a: cL"ati:i~c; ~
A, i~.G-E.rv E°,ri~ t~T~ y~i~ t~yl>c; n3::~c~Sn.+, u1 s:t:~£::i~ u; il ~~ zz+rr,:v~~'7x!'c3 t,a~. ~,u~1i tt(r.-~'s'e;~:.*k:~ rn~.Ue};
:~ ;'-.k ; s~,~r>.i~l~s H°~ a:'e3',u; en: Ttr~ ,~i't ~r~: ^nLV: c~ ~~ e iar~fa~.y '.ys3 „rJ ra< s~ ac c~ ~th
<.hr::Y,;,~~>~:~'r ~a;~^~t~ i~•i€ ~tiwn+ ^;talt ?c,~ A'~ aV~~~. 1:2s7.^ d~, xirn int;~'a~f~:~rr* ~CK:rr:
~r.:C,tr <+;;; ..
~-~ !E• e•i"l ~;' Y'tU~/C:~~'l1Tf.. iYY~'! ~iE±~. ~S Tii34'" ..: {Eiic' f;'rt JV'/~:lg' S-' l'iI£:U^.~ E{i;".:J<`'G'"' j~ L,.c'~'
? r~~°. ~~~r, <'it;;:i. ~T7>a~ f~~ T~~r~;:~ =;~^at: t, j:t ~'i~ ~~~ss~;:;.n r.xr~~tn?~ a'~: c:t~ ;c~:;cir,
x m~ T-~~ r.i ~cj u:x~5r~. r,~,e: au;;tnx:r.•aE: b, ;; 'i7`r: t~:t : y;~.+F.t:-;. ~!':1r vp!; t'; _ t?'.*c<t` A•
.~~.zs~~~_:e~ w Tpj~ii:a y'.a:-r~¢i~ir~.,;,~~ia~ai~ ~~N:~~~t,rtr.:::`,<~,;c:t
~~:v~:~?ti Nni, 't~ ,4~ 1'+'°a,, t+t+ i'!sperStd x't*.;rvr.rt;~e z.2~kC•+t~ ;~~~rsvs uviCe-u_x tf
;.r ~a;~
~
`~;r ,
?. _
1%i~/C''I' i:1[
OtAerA+YWap Phofos
~
Vti'rap - A= Wrap
_ . _ _~,,.
~'• '
:i yr~ - ~
,~ 7~~s~.__..
. ::U~~E,:I[::'Y. t'J'~~
~ Fe~`:xe?r.r
. i'~,'a!e~ F+pPI'r.:<^`.o~
¢'~ick t0 IOD
C~
l.rl8,'U9 ~ 32 F
~ipe~~~ra;. A~Wrap ?i;~vSUCK Spl~~hGa~c EPuxifs GinWtep Proa~,c.Jsc Un,'erFp:m C~?~[a~tws ~ome
i ~fi'~5~.?E ra Fasr.nel
:'~?;t,Sili, Ji.:g 1,1 ~~~.~ ~n:':f..t' 1~~:",t i.~ F: i~ rL.. . ..~i ~~.. ~ , . ..
.
.
MGS FIELD WELLS
CHANGE WELL STATUS FOR WELLS WITH LATERALS
FEBRUARY 16, 2006
The following wells status was changed from SQZED to I-OIL. These
wells had laterals drilled against them and production was assigned to all
laterals in Cook Inlet when the wells were first drilled. Since then, AOGCC
changed the policy about lateral wells and assigning production against
lateral API numbers. This policy is like the lateral wells on the North
Slope. Today I notice wells producing in the MGS field with a status not
conducive to the well status and changed it to I-OIL. All the wells show oil
production over the years. The status date reverted back to the date the well
was completed as an oil well. The following wells were corrected:
MGS A12-01
MGS A13-01
MGS A14-01
MGS A22-14
MGS A23-01R
MGS A31-14
MGS A41-11
PERMIT 177-055
PERMIT 166-015
PERMIT 167-079
PERMIT 185-068
PERMIT 187-093
PERMIT 177 -031
PERMIT 185-174
All production has been assigned back to the original well API number, no
production is assigned to a lateral well API number.
~---=, --> !IJ f} . /i IJ f
;~y.J ~A/U¿- ji V It J l ~ßvt1<}¿J
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
August 4, 1999
William Miller
Cross Timbers Operating Company
HC01 Box 485
Old Wik Road
Kenai, AK 99611-9704
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dear Mr. Miller,
Re:
Administrative Abandonment Action Middle Ground Shoal Wells
A33-11 Permit # 85-235 A22-14 Permit # 85-068 Al4-01 Permit # 67-079
Al2-01 Permit # 77-055 A31-11 Permit ~
Al3-01 Permit # 66-015 A41-11 Permit # 85-174
This letter reflects the lateral well that replaced the original well by well number, permit number and API number:
A12-01LN (permit # 94-120, API# 50-733-10081-62) permit was approved 9/29/94.
A13-01LN (permit # 94-105, API# 50-733-10079-61) permit was approved 8/05/94.
AI4-01LN (permit # 94-119, API# 50-733-20067-61) permit was approved 9/27/94.
A22-14LS (permit # 94-071, API# 50-733-10085-62) permit was approved 5/13/94.
A31-14LW (permit # 94-044, API# 50-733-20305-62) permit was approved 3/23/93.
A33-1 ILS (permit # 93-180, API# 50-733-20383-61) permit was approved 11/30/93.
A41-11LN (permit # 94-087, API# 50-733-20378-61) permit was approved 6/28/94.
The replacement well incorporates a lateral with the existing well bore. The lateral along with the original hole will be
used for production of hydrocarbons. A review of both well files indicates administrative abandonment (SQZED, AOGCC
status) of the originating well bore is appropriate according to current AOGCC procedures for wells where additional
permitted laterals are drilled from an existing well bore. Production will be reported to the original API wellbore (-00, -01
or etc) and not to the lateral API wellbore (-60, -61 or etc).
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the
original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC databases require each conductor
have only one permit number and API number. Administrative abandonment of the original permit only eliminates
duplication in the databases. Information for the original well and its replacement will be maintained in their respective
files until plugged and abandoned according to 20 AAC 25.105.
Please notify other cognizant personnel in your organization so that the well will be correctly identified on subsequent
reports and applications submitted to the Commission.
Chairman
Memorandum
State of Alaska
Oil and Gas Conservation Commission
To.'
Re:
Well File: A33-11 Permit # 85-235
Al2-01 Permit # 77-055
Al3-01 Permit # 66-015
Al4-01 Permit # 67-079
August 04, 1999
A22-14 Permit # 85-068
A31-11 Permit # 77-031
A41-11 Permit # 85-174
Administrative Abandonment Action Middle Ground Shoal Wells
This memo will remain at the front of the subject well file.
The following lateral wells replaced the original wells listed above. This letter reflects the lateral well that
replaced the original well by well number, permit number and api number:
A12-01LN (permit # 94-120, API# 50-733-10081-62) permit was approved 9/29/94.
A13-01LN (permit # 94-105, API# 50-733-10079-61) permit was approved 8/05/94.
A14-01LN (permit # 94-119, API# 50-733-20067-61) permit was approved 9/27/94.
A22-14LS (permit # 94-071, API# 50-733-10085-62) permit was approved 5/13/94.
A31-14LW (permit # 94-044, API# 50-733-20305-62) permit was approved 3/23/93.
A33-11LS (permit # 93-180, API# 50-733-20383-61) permit was approved 11/30/93.
A41-11LN (permit # 94-087, API# 50-733-20378-61) permit was approved 6/28/94.
The replacement well incorporates a lateral with the existing well bore. The lateral along with the original
hole will be used for production of hydrocarbons. A review of both well files indicates administrative
abandonment (SQZED) of the originating well bore is appropriate according to current AOGCC procedures
for wells where additional permitted laterals are drilled from an existing well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data bases
require each conductor has only one permit number and API number. Administrative abandonment of the
original permit only eliminates duplication in the databases. Information for the original well and its
replacement will be maintained in their respective files.
The operator has been notified of this action.
new permit number, API number and well data.
Statistical Technicia~~-/~- ~ ~_L/~
All future correspondence with the AOGCC should reflect the
Statistical Technician ~2~~
Reservoir Engineer
Commissioner
Petroleum Geologist
PLUGGING & LOCATION CLEARANCE REPORT
State of Alaska ~ ALASKA OIL & GAS CONSERVATION COMMISSION
PTD No. 77-0~1
Lease
Memorandum To File: API No.
Well Name
Operator
Location
Abnd Date
Spud: ~/~./~ , TD:
Note casing size, wt, depth, cmt vol, & procedure.
Liner:
Perf inte~als - tops:
Review the well file, and comment on plugging, well head
status, and location clearance- provide loc. clear, code.
Well head cut off:
Marker post or plate:
Location Clearance:
Conclusions:.
Code
ALASKA OIL AND GAS
'. CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276.7542
Paul Huckabee
Shell Westem E&P Inc.
601 West Fifth Ave. Suite 800
Anchorage, Alaska 99501
Dear Mr. Huckabee,
Re:
Administrative Abandonment Action
Middle Ground Shoal A-31-14 Permit # 77-0031
Well A-31-14 was replaced by A31-14LW (permit # 94-0044, APl # 50-733-20305-62) when the permit
was approved 3/23/94 and operations completed in May, 1994. The replacement well incorporates a
lateral with the existing well bore. The lateral along with the original hole will be used for production of
hydrocarbons. A review of both well files indicates administrative abandOnment of the originating well
bore is appropriate according to current AOGCC procedures for wells where additional permitted laterals
are drilled from an existing.well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
·
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and APl number. Administrative abandonment
of the original permit only eliminates duplication in the databases. Information for the original well and its
replacement will be maintained in their respective files.
Please notify other cognizant personnel in your organization so that the well will be correctly identified on
subsequent reports and applications submitted to the Commission.
Sincerely,
Russell A. Douglass
Commissioner
$I'0¢K No. 753 ~
MADE IN LI. S h
Shell Western E&P Inc. Q
601 West Fifth Avenue ,, Suite 800
Anchorage, Alaska 99501
June 11, ]990
Alaska Oil and Gas Conservation Commission
ATTN: Elaine Johnson
3001 Porcupine Drive
Anchorage, Alaska 99501
SUBJECT: TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI
OPERATED MIDDLE GROUND SHOAL FIELD
Dear Ms. Johnson:
In a recent telephone conversation you discussed with Ms. Susan
Brown-Maunder information that would be helpful to you if we could
provide it. Enclosed, for your convenience and use, are the following:
location surveys showing the location of Platform A
list or'conductor/well locations (in relation to the SE corner
of Sec. II, T8N, RI3W) for Platform A wells
location survey showing the location of Platform C
list of conductor/well locations (in relation to the SE corner
of Sec. 23, T8N, R13W) for Platform C wells
In addition you requested a revised copy of the Well Completion or
Recompletion Report and Log (]0-407) for the recently completed well
C21-23. The well location at the top of the producing interval and the
well location at total depth as been changed to reflect the actual
surveyed location.
If you have any further questions regarding these matters, please
continue to contact Susan Brown-Maunder at (907) 263-9613.
Very TrulymYours,
W. F. Simpson ~.
Manager, Regulatory Affairs
Alaska Division
WFS/SBBM/vj
Enclosures
cc: Susan Elsenbast-AOGCC
\LETl'ERS\AOGCC\O61190.DOC
RECEIVED
JUN I
MIDDLE GROUND SHOAL
P1 atform "A"
WELL/CONDUCTOR LOCATIONS
Leg I - Center of Leg i @ 1627'N & 435'W from SE corner of Sec.11, T8N,
R13W, S.M.
A 12-01 I 1632
A 11-01 2 1632
A 43-1I 3 1630
A 34-11 4 16 25
A 34-14 RD 5 1622
A 22-14 6 1622
A 12A-01 7 1625
A 13-01 8
N & 437
N &432 W
N & 430 W
N & 430 W
N & 433 W
N &437 W
N & 440 W
1630 N & 440 W
W from SE corner
II II II
II !1 II
II II II
· II II II
II II II
II II II
II II II
Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec.11, T8N,
R13W, S.M.
A 42-11 9
A 44-02 ~ 10
A 42-14 11
A 41A- 11 12
A 11-12 13
A 11-13 RD 14
A 31-14 15
A 44-11 16
1685
1685
1683
1678
1675
1675
1678
1683 N & 378'W
N & 374'W from SE corner
N & 370'W " " "
N & 368'W " " "
N & 368'W " " "
N & 37 I'W " " "
N & 375'W " " "
N & 378'W " " "
II II II
Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec.11, T8N,
R13W, S.M.
Leg 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N,
R13W, S.M.
A 33-11 25
A 14-01 26
A 12-12 27
A 24-01 28
A 13-12 29
A 33-14 30
A 41-11 31
A 23-01 32
1571
1571
1568
1564
1561
1561
1559
1569 N & 388'W
N & 385'W from SE corner
N & 381'W " " "
N & 378'W " " "
N & 378'W " " "
N & 381'W " " "
N & 385'W " " "
Oil & Gas Cons. Commission
Ancl~orage
COO/' I ,,,,,., ,., A
J T911 S.M. I [
: ; ADL 18754 i : ..
LAT. $0'47' 44.ao~;"t: ,,~,, PLATFOR LOC4TIO/! ·
STATE G~ID COORD. ~ '
Y · 2.485,840 ' 1623.5' ...
.
27 ~" ' 26' 25 ~0
.
,
' '
34 35~6 ~1
~ : :¢. LOCATION OF
' -JUH 13 197D SSLF CONTAINED DRILLINg ~
til~a ~il & Gas Cons. [~,Ummi0sion PRODUCINO PLATFORM
T 8 N S.M. , Anchorage J SHELL MIDDLE GROUND SHOAL
~ T 7N S.M., t , 4 PLATFORM "A"
i COOK IHLET. ALASKA
!
o .,oo~ eggo ,.~ooo APPLICATION BY SHELL OIL CO.
' "---~"~--"- -' lng ANGELES. CALIFORNIA
· .
~i T. 8 N., R.13 W., S.M.
3 £
I0
ADL
II
14
i0
I
I
F 1__8 7_5 ~ ....
I
2_. !
LEG NO.
LEG NO. I LEG NO. 2
PL
X " 2:52,785 X: 2:52,846
Y : 2,48 5,845 Y : 2,48 5,897
16:;'7~ N ~ 435'W
FROM THE SE COR. OF
SEC. I!, TSN, RI3W, SM.
LEG NO. 3
X: 232,896
Y: 2,485,835
PUBLIO L41VD
1681~ N ~ ~7;:'~ W
FROM THE SE COR. OF
SEC. II~ TSN~ RISW~ SM.
D £ $ ¢ t~ I P lt l O fl
1620'N 'B, 321' W
FROM THE SE COR. OF
SEC. II, TBN, RI3W, SM.
LEG NO. 4
X: 232,833
Y =2,4'85,785
1566'N I~ 383'W
FROM THE SE COR. OF
SEC. II, TSN,Ri3W, S.M.
GEODETIC ¢OORDINATES
II LAT-- G0°47'44-839'' LAT.- 60°47'45.368'' LAT' - 60°47'44. 7G8'' LAT' - 60°~7'4'1'244"
LONG.-151° 29'45. 112"- LONG.-151°29' 43.942" LONG.-151°29' 42/899" LONG.-151° 29' 44.154"
,: [:'~AWN ;~'/ tt A.D. ~I c~r, LE I": I000'
~ c~;~:c::~ ~ ~.,;.~. , SHELL 0[' COP~"' ~"'
· .~ i'141~ 'i
,,
STATE OF ALASKA
ALASKA~L AND GAS CONSERVATION C~O~MMISSION
SU , DRY i )¥1CES. B D IR PORT WE .[.S
DRILLING WELL []
COMPLETED WELL ~
OTHER []
2. Name of Ope,ator
____SHEll 0I [ C:0HPA[IY
3. ~dor~,, ATTN' PRODUCTION SUPERINTENDENT
Wayne S/mason, 601 W .5.th ^ye., #810, Anchorage. AK 99501
4. Location of Well
Conductor 15, Leg 2, 6958'N & 378'W from SE'Corner
Sec. 23, T8N, R13W.
5. Elevation in feet {indicate KB, DF, etc.)
116' K.B.
12.
I 6
. Lease Designation and Serial No.
ADL 18756
7. Permit No.
77-31
8. APl Number
50-. 733-20305-01
Unit or Lease Name
MGS
O. Well Number
A 31-14
1. Field and Pool
Middle Ground Shoal
G Pool
,.
Check Appropriate Box To Indicate Na'tUre of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
{Submit in Triplicate) (Submit in Duplicate)
Per,~orate C] Alter Casing [-I ~ Perforations [] Altering Casing r"J
Stimulate [~ Abandon [-1 Stimulation [] Abandonment []
Repair Well [] Change Plans [:::] Repairs Made [] Other ['1
Pull Tubing [] Other [3 Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, fc~r Abandonmenl see 20 AAC 25.1.05-170).
PROPOSAL' Reperforate HK/HN and HN/HR zones to increase production,
12/22/82 Rigged up on A31-14. Reperforated 9475-9495 (20'), 9430-9460 (30'). Flow
tested through separator.
12/23/82 Reperforated 9340-9370 (30'), 9260-9320 (60'). Flow tested through
separator.
down D/A. Sent crews to shore and equipment to Platform C...~
12/24/82
Rigged
;4. I hereby cer:if¥- that the foregoing is true and correct to the best of my knowledge. .~1_.It
Sign~.~ ~//~J~~ Title Production Administration
The s,3ace below for Comm;s.<ion use
1/6/83
Date
Conditions of Approval. if any'
Be O,oe~ of
Approve~l by, COMMISSIONER the Commission
Dale
Fcrm 10403
Rev. 7-1-80
Submit "Intentions" in Triplicate
cod "Subsequent Reports" ~n Duplicate
0 i 111 1_ k../t /tLlSOl\/1,
AI_ASKA O..IJ._ AND GAS CONSERVATION O -P~MMI$$1ON
OTH E R(~~%1'
DRILLING WELL[]
COMPLETED WELL
2 %'ama of Ope'ator
..... SHELL__O]
3. ,~do.r~s MTN' PRODUCTION SUPERIIITENDENT
~::lay~e Simpson, 60] H 5th Ave., #8].O_,_Anchor_a~e, AK 99501
~ ~.o,:a~;on of Well
Conductor 15, Leg 2, 6958'N & 378'W from SE'Corner
Sec. 23, T8N, R]3W.
5. Elevation in feet [indicate KB, DF, etc.)
]16' K.B.
12.
I 6
. Lease Desi9nation and Serial No.
ADL 18756
7. Permit No.
77-31
8. APl Number
50- 733-20305-01
9. Unit or Lease Name
MGS
10. Well Number
A 31-14
11. Field and Pool
Middle Ground Shoal
G Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
{Submit in Triplicate) (Submit in Duplicate)
P.rrorate !~ Alter Casing I~ t Perforations E~ Altering Casing
Stimulate E) Abandon [] Stimulation [~ Abandonment
Repair Well [] Ch<~nge Plans [] Repairs Made ~ Other
Pull Tubing [] Other [] Pulling Tubing []
Report rrul;iple completions on Fo~m 10407 with a submitted Form 10-407 for each completion.)
13. _r'esc,ibe Propcsed or Completed Ope,a~ions (Clearly s~ate all pertinent details and give pertinent dates, including estimated date of starting any
p:opnsed work. for Al;.~ndonmen! see 20 AAC 25.105-170}.
See Attached.
Sul~equemt Work Reported
:4, I hereby cer:iJ'F thai the//for~coing is true and correct to the b~st of my knowledge.
s,g...~ ~__~.~ ~ Ti... Production Administration
The sD~ce below for Comm:ssion
CohO,lions Ol APp,Cval. ~f any; Approved Copy
12/6/82
COMM!SSIONER
[ie.~urned
Bt O,oet of
the Corr. mis$ion Date
Fcrm 10403
Rev 7-~ ~0
end "Subsec:uen! ReDo;ts" ,n Duphcale
A31-14
Middle Ground Shoal Field, Alaska
Reperforation Worksheet
Status'
Well gas lifting 414 BDO with a 31% cut.
Mechanical Details- See attached s~atic.
production·
·
MIRU Dresser Atlas with lubricator and grease injection head.
Pressure test lubricator to 3000 psi.
Note'
Dresser Atlas and equipment is only used as a base
case. If equivalent services can be obtained by
other service companies at a lower price, it would
be favorable.
0
Perforate selected intervals with 4 holes per foot using a
2-5/8" hollow carrier gun loaded with 12 gm charges (90°-2
d~rection - symmetrically magneted phasing would be favorable,
0 phasing would be acceptable) and positioned with a magnet
at the bottom of the gun assembly.
Sequence Zone DIL Depth
1 ~ 9475-9495
.... 9430-9460
Total
20
30
6o
140'
2 HN/HR 9340-9370
9260-9320
Casing Collars-
9495, 9451, 9411, 9368,
9324, 9283, 9240, 9197
(All casing collars are adjusted to DIL depths dated 9/19/77.)
3. Keep well "gas lifted down" while perforating.
e
e
Establish inflow rate with _+12 hour (or until rate stabilizes)
flow tests after perforating each sequence. Send these rates
to T. S. Burns, Houston.
Rig down Dresser Atlas.
STATE OF ALASKA
ALASKA ---_ AND GAS CONSERVATION C~-~.4MISSION
DRILLING WELL F-I
COMPLETED WE LL :~
OTHER []
2. Name of Operator
Shell Oil Company
3. Addr.~ Production Superintendent
· ~ Anchoraqe AK 99501
601 t.l 5th Ave., ~-810,
4. Location of Well
Leg 2, Conductor 15: 6958'N &.378'W of SE Corner of
Sec. 14, T8N, R]3!.I, S.M.
5. Elevation in feet (indicate KB, DF, etc.)
116' D.F.
I 6
. Lease Designation and Serial No.
ADL 18756
12.
7. Permit No.
77-31
8. APl Number
so- 733-20305-01.
9. Unit or Lease Name
MGS
10. Well Number
A 31-14
11. Field and Pool
MIDDLE GROUND SHOAL
"G" Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [~ · Perforations [] Altering Casing !-1
Stimulate [] Abandon [-'1 Stimulation X ~. Abandonment []
Repair Well r'l Change Plans E] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work. for Abandonment see 20 AAC 25,105-170).
Proposed job cancelled.
Signed . . TiHe Production Admi'nistratinn
The space below for Commission use
Date 1?/R/R?
·
Conditions of Approval, if any:
By Order of
Approved by. COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" ,n Triplicate
and "Subsecluent Reports" in Duplicate
STATE oF ALASKA
ALASKA ¢-~. AND GAS CONSERVATION Cr--IMISSION
DRILLING WELL []
COMPLETED WE LLX:x
OTHER []
2. Name of Operator
3. Address ',:layne Simpson
601 W. 5th Ave.: #810, Anchor:age, AK 99501-
4. Location of Well
,
Leg 2, Conductor-15' 6958'N & 378'W of 'SE Corner of
Sec. 14, T8N, R13W, S.M.
5. Elevation in feet {indicate KB, DF, etc.)
116' D.F.
6. Lease Designation and Serial No.
^DL 1875'6
7. Permit No.
77-31 -
8. APl Number
s0- 133-20305-01
9. Unit or Lease Name
HGS
10. Well Number
A 31-14
11. Field and Pool
HIDDLE GROUND SHOAL
"G" Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEOUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] ~ Perforations [-I Altering Casing
Stimulate X~ Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
SEE ATTACHED
RECEIVED
NOV 0 4 ]_982
Alaska Oil & Gas Cons, Commis=i.~=;
S,gned14' I hereby c~i~aj~egoing is true and correct to the best of my knowledge.Title PRODUCTION ADMINIST__TIONRA
The space below for Commission use
Date 10/21/82
Conditions of Approval, if any:
Approved by
Approved Copy
Returned
By Order of
COMMISSIONER the Commission
Form 10-403
Rev. 7-1430
Submit "InTentions" in Triplicate
and "Subsequent Reports" in Duplicate
Stimulation Prognosis
A31-14
Status'
Well producing 430 BDO (30% cut) through the HK/HN, HN/HR
and HR/HZ zones.
Objective'
Clean out perforations in the HN/HR and HR/HZ zones using
acid placed with coiled tubing.
Procedure- Note' Check diesel and acid compatibility before job.
1. M.I.R.U. wireline and lubricator. Test lubricator to 3000 psi.
Run in with wireline and retrieve bull valve at 307'. P.O.O.H.
Make drift run with 2 1/4" tools to bottom (_+9547'). P.O.O.H.
and rig down wireline equipment.
2. Shut well in at surface-do not bleed casing pressure.
3. M.I.R.U. coiled tubing unit and .Dowell acidizing equipment.
Test tree and coiled tubing to 5000 psi. Test hydraulic system
and BOP.
4. Run tubing in the hole slowly (no more than 100 FPM). Tag
bottom (_+9547'). If fill is above bottom perforations at
9534', notify T. S. Burns (713) 870-4465 or (713) 980-4393
(home).
5. With coiled tubing at 9534', pump 205 gal. of 7% HC1 with 0.3%
W-35, 0.2% F-75N, and 1.0% A-200. MoWe coiled tubing uphole to
treat entire perforated interval (9534'-9260') while pumping.
6. R.I.H. tubing to 9534'. Pump 410 gal. of 7 1/2%-1-1/2%.
HC1-HF with 0.3% A-200. Move coiled tubing uphole to treat
entire perforated interval (9534'-9260') while pumping. Stop
coiled tubing at 9260'.
Note- Do not leave mud acid standing in wellbore.
7. Clear coiled tubing with 19 bbls of diesel. Pump an additional
15 bbls of diesel to displace acid into perfs.
8. P.O.O.H. and rig down. Leave tubing full of diesel (19 bbls)
pending further use of the coiled tubing unit.
9. Put A31-14 back on gas lift production. Test well for several
days until well is producing at stable rates. Report rates to
T. S. Burns in Houston. Return well to regular test rotation.
RE£E VED
T SB' ml~~/''']~';''~'~/'-'''~'''~'- NOV 04J-~'~l~ ~ 2 Approved ~x/~ ~~
-.
,~(~~ ~ Oil & Gas Cons. Oommissi~.s Date i1~3/~ Anc~mmG~
Coiled Tubing Stimulation
Cost Estimate
A31-14
1. 205 gal HCl (a$1.10/gal $ 225
I gal W-35 (aS 33/gal 33
I gal F-75N (aS 36/gal 36
2 gal A-200 (aS 34/gal 68
2. 410 gal HCl-HF (aS 2.4/gal $ 984
2 gal A-200 (aS 34/gal 68
3. Pump
I day (a$1,3OO/day $ 1,300
4. Tanks I day (aS 470/day $ 470
5. Lines $ 1,300
6. Personnel 1 day (aS 924/day $ 924
7. Miscellaneous
$ 1,000
8. Coiled Tubing Unit (a$15,000/day $15,000
Transportation $ 1,100
Total $22,508
Say $24,000
DATUM 38'
]
A 31
-14
COMPLETION DETAIL
10-1 1 -77
·
· .
.
I rem'No.." 'De~criPt{on.
·
2.
3.
4.
5.
6.
7.
8.
9.
0.'
1.
· ,.
Otis Ball Valve Ni~'ple, .
£amco KBUG Mandr. el
I1 II II.
o.
il II II
II II . II
11 ' II I!
II ii II
II II II
Guib.Uni VII Packer
Brown Oil Tool Tie Ba~k Packer. '
Otis' X-Nipple ..
E.O.T. -
TVD
299·
TUBING'
3N" 9.2// N-80 Buttress
LINER-
.
5N" 17# N-80 w/shoe at.96q6'
CASING': '
7 5/8' 33..7# P-110 w/shoe at 8745"-
.
·
SURFACE'PIPE'
10 3/4" 40.5# J-55 w/shoe at 3130'
PERFORATIONS-
HR-HZ 9408-9459~ 10-7-77
9473-9534' " 10-6-77
HN-HR 9335-9384~// 10-8-77
9260-9321 l/ 10-9-77
HK-HN 9180-9246 10-10-77
9109-~121 10-11-77
Cement Retainer @ 9547'
299....
i933..'
3559
5053·
6664
7359 ..
8067
8418
8457
·
8474
8498 .'
8530'.
Page 60
-I
I
I
!
I
!
I
I
!
!
!
!
!
!
!
!
!
i
!
·
I
I
!
!
!
I
I
i
I
I
I
WESTERN E&P 'OISERA...ON$
SHELL-ATLANTIC'STANDARD
/
l'.__......
~ ~ ~-m .
-Z ~ ~'.'-°'l_' '
" ~-' ..... F-- . . -
i . ~ M,,-,, I ' I
-~ ~!'.~: ~ '-':.~ ~ . ·
/ ~'; ~,>--/ , /.' ', -
,~-~,,~ . ,..... .
~ .. ~.~,--F ~. ..~ .
'~ ' t - ~'
! e.~''" I '..- ' .
"~. /' ~ '
-I' /" '
. ~ , ~. INJECTION WELL
~'-" [ i~ .... - .... ~ PRODUCING WELL
/~~'~' [ .1" ' ~P.~ PLUGGED & ABND
I ~.~ PBS
. Ai)L
.o
PATTERN
5120 Ac.
II~
3
4
Oil & Gas i;orr~, CoJt~mis:;i,v;i
I
400'0
1 1/4" COILED TUBING S?ECIFICATION'~
Actual O.D.
Nora{hal I.D.
Wall thickness
·
Weight
Wall area
Flow area
1. 230 in.
1. 084 in.
O. 083 in.
1.034 lbs/ft.
0.304 in.2
0.925 in.2
Tensile:
Ultimate
Yield
Max. Operating
22,800 lbs.
21,300 lbs.
17~'000 lbs.
Burs t:
Ulti~zte
Test press.
Max. Operating
9,960 psi.
6,000 psi.
5,000 psi.
C ollaps e:
Ultimate
Max. Operating
6,100 psi.
1,300 psi.
Capacity:
i.14i Bbl/1,000 ft.
875 ft./Bbl.
Wall displacement
o.377 Bbl/1000 ft.
Total displacement
i.5i8 Bbl/i000 ft.
RECEIVED
Oil & Gas Cons. Comm[s.,~,,
SHELL OIL COMPANY
1700 BROADWAY
DENVER, COLORADO I~I~L~I~][ 80290
May 4, 1978
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. O. K. Gilbreth
Gentlemen:
E~~~ are two sets of the well logs for C-44-14RD. The well
logs for~-31-1~nd A-12-1 are being reproduced in our Houston office
and will~--~to you "Special Delivery" as soon as they are ready.
I have also attached an additional copy of the documents we sent
you yesterday. Unfortunately they were sent regular mail and this letter
will be sent "Special Delivery" to avoid delay.
THB:DW
rs~y truly,
R. Planty
Division Operations Engineer
Rocky Mountain Operations Office
Enclosure
1978
State of Alaska
Division of Oil. and Gas
3001 Porcupine Dr~ve
Anchorage, Alaska 99501
Attention Mr, ~'~, w~ Gilbreth
Cent !emen:
Attached are the following documents per your discussions
with Mr. ~.~. L. Wood,on:
1. Monthly Report (>{arch 1978) - C-&2-23
2, Monthly Report (April. 1978) -C-42-23.
3, Monthly Reoort (April 1978~
4, Sundry Notice - A-23-1 _-~----, ~
, Directional Surveys A-3!-!4 A-12-1 and C-44-16
The well logs for A--31~14, A-!2~l. and C-~4-14 will be ~ent
to you shortly under separate cover from our Houston Office.
TB:t~
Yours very truly,
R, Planty
Division OveratJon~ EngJ.noer
Rocky ~ountain Oper~ions ~f-~ice
Attachments
cc: Mr, ~ I.. Woodson
Form P--7
' SUBMIT IN DUP~_ rTM
STATE OF ALASKA (see other
st ructions on
OIL AND GAS CONSERVATION COMMITTEE ..... -s~
i i
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
1~. TYP~ OF WELL: oH~.~" "
,,'~LL ~ ~Sw~L~ ~ ~ ~ Other
b. TYP~ OF COMPL~ON:
w ELL OV ER EN BACK EESVR. Other
,, ,
2. NAbIE OF OPERATOR
Shell Oil Company
3. ADDRESS OF OPERATOR
1700 Broadway, Denver, Colorado 80290
LOCATION Or WELL (Report location clearly and in accordance with any State requirements)*
~tsU.~.oePlatform A. Leg 2,_.Conductor 15: 6958' N & 378' W of -SE Corner of Sectzon 14-T8N-R13W, S.M.
at top prod. ~nt~r~l repottea below4177' N & 1716' W of SE Corner of Sectior
14-T8N-R13W
At total depth
4173' N & 1748' W of SE Corner of Section 14-T8N-R13W
6/12/77 J 9/18/77 [ 10/11/77
18. TOTAL DEPTH NLD & TVD[I[L ~LU_~) B~CK
' &' [9547 MD &
~{~' ~D 8612' TVD
5. API NU1VLE~C~ CODE
50-133-20305-01
6. LEASE DEC:xlGNATION AND SERIAL NO.
ADL 18756
7. IF INDiA.N, ALLOTTEE OR TRIBE NA1VL~
8. UNIT,FA.R2/I OR LEASE NAME
, Hiddle Ground Shoal
9. WEI~L NO.
MGS A-31-14
10. FIELD A2qD POOL, OR WILDCAT
, MGS - "G" Pool
MD & TVD~0. I~ 1V~ULTI2LE COiY~PL., 21.
I~OW 1VI.,.~Y* ROTARY TOOLS
- Total
~2. PRODUCING IN-TE2RVAL(S), OF THIS COMPI~TIO~, BOTTOM, NAME 0VID AND TVD)*
Top: 8810' MD, 7906'~ TVD
Btm: 9550' MD, 8615' TVD
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Section 14-T8N-R13W, S.Mo
12. PERa~IT NO.
77-31
INTERVALS DRLLLED BY
CABLE TOOLS
--
23.WAS DIRECTIONAL
SURVEY MADE
Yes
il6..]~EVATIONS (DF, RKB, I~T, GR, v~C)*tl7. EL,EX/. CASINGHEAD
116 ' DF ] -
24. TYPE ELECTRIC AND OTHER LOGS RUN
DIL/LL8/SP/OR, BH.C Sonic/GR/SP/Cal? CNL/FDC/Cal .
CASING RECOP, D (Report all strings set in well)
.
10-3/4,' 4-0.5 IJ55' ' 2502' 15" 2000 sx + 700 sx BHS -
7-5/8" 26.4 & 33. N80 ~ 8745' 9-5/8" 505 sx -
'5-1~'_'' )=7485' l: 96¢6'~' [ 200 , /2"
9104-9121 9408-9459 ~ ~
9180-9246
9260-9279 all perfs - 4 holes
9335-9384 ~per ft DivisiOn
9473- 9534 ~ons~rva
~. ~ODU~ON
10/13/7~ } 2~ I 128/64
~' l' 1793 I 858
~W,~sS.~BING ~iCAS~G P~SSU~ [24-HOuRIC~L~~R~ OI~BBL. GA~I~. WK~BBL. ]OIL GRAVITY-~I (CO~.)
I ! ' I I
31. DISPOSITION OF GAS (~Oid, ~$ed few f~e~, vented, etc.)
TEST WITNESSED BY
Gas lift, fuel, sold
32. LIST 0F ATTACHMENTS
~ell History
33. I hereby certff~t[at t~egotng and attached information Is complete and correct as determined from alUavatlable records
i i i~ i
*(See Instructions and S~ces for Additional Data on Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report end :tog
all types of lanJs and leases in Alaska.
Item: .16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
merits given in ether spaces on this form and in any attach;ner~ts.
Items 20, and 2.2:: If this well is completed for separatc prcduction from more than One interval zone
(multiple completion), so state in item 20, and in item 22 show the prcJucing interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interv~l reported in item 30. Submit a separate report
(page)-on this form, adequately identified, for each additional interval ~to be seperately produce,J, show-
ing the additional data pertinent to such interval.
Itam26: "Sacks Cement": Attached supplemental records for this well shoulJ show 'the details of any mul-
tiple stage cementing and the location .of the 'cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above). ::
'al. SUMMAIt'¥ Or fORMATION TES'I:S IN('LUI)IN(; 'INTEI!LVAL +ES'rED. PREF~$UIIE'DATA./~fD'~tECOVERIES OF O1~i
~5, GEOIX)G IC
WATER AND MUD
NAME
HC · 8810 7906
HD 8907 7999
HE 8953 8043
HF 8985 8074
HI 9053 8139
IlK ~ 9104 .,:, 8188
HN 9249 8327
HR 9384 ~ 8456
HZ 9550 !. 8615
36. COIIE DATA. Aq'I'AClt :]]RIEF ~DESCir~II~.IfEION$ OF 'LITIIOLOGY. POROSITY. F[IACqL'UR,~o..'.AP, P, ALI~EN;T:'tDIPS
AND'.DE'I:ECTEI):.S'IIOWS OF OIL..GA.S:,OII WATEII. :.
·
..
·
.,
,
NEW OIL WELL
MIDDLE GROUND SHOAL
SHELL~CHEVRON USA-AMOCO-ARCO
FROM: 6/8/77 - 10/18/77
LEASE MGS WELL NO. A-31-14
DIVISION WESTERN ELEV 116" DF
COUNTY STATE ALASKA
ALASK~ /
~X~DDT_,E OROUN~ SHOAL
A-31-14
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
A-31-i4 ' -
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
A-31-14
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
A-31-14
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
"FR" TD 3620. PB 3186. Funds are provided to plug &
abandon AWS-1 and drill A-31-14 from same csg. 6/6 RU.
6/7 Pmp'd in 35 bbls 11.7# mud; well dead. Removed WH &
installed BOPE. RIH w/tools & 9-7/8 bit to top of
liner @ 3075'; no fill. RIH w/6" bit & CO to 3090'.
Circ'd btms up. 0UN 0 8 1977
TD 3620. PB 3186. RIH & set Howco 7" cmt ret @ 3090.
Stung out & press'd csg to 500 psi 5 mins; no leak off.
Pmp'd in & equalized 114 cuft @ 15.9 ppg w/.75% D31,
.02% D19, .01% D6 & 2% CaC12 w/BJ cmt'rs. Est top of
cmt 2883'. Pulled 5 stds & circ'd out DP w/wtr. CIP
2:20 a.m. LD 3-1/2 DP, pulled table & removed. BOP
w/riser. Cut off 10" 2000 WI{ & welded on 10" 3000 WH
to receive 7" csg. Tested weld to 1000 psi, ok. Installed
BOP & riser. RU to test BOP. JUN 0 9 ~977
TD 3620. PB 3186. Tested hyd to 1500#. Tested blind
rams, pipe rams, kill line valves, chk line valves, chk
manifold, lower Kelly valve & Kelly valve w/3000#. Tested
Kelly hose & std pipe to 2500# using wtr for all tests.
Removed test plug & sgl'd in 5" DP. Found stringers of
cmt @ 2876 & hard cmt @ 2947. Closed pipe rams & tested
csg to 1000# for 10 mins, ok. Chng'd over to mud; blt
vis to 65. PU Servco mill, 6 DC's & meas in hole; could
not find a collar. Started mill'g @ 2502 @ 5 p.m.; J
tube plug'd. CO J tube 3 hrs. Had milled 10' @ midnight.
TD 3620. PB 3186. 6/10 Fin'd CO J tube & started mill'g.
Flwline plug'd. Welded washouts on flwline; worked for
awhile, but plug'd again. Found a plug in flwline; cut &
repaired. Mill gave up @ 2525; POOH. RIH w/new mill.
6/11 Fin'd CO cmt. Milled on csg to 2537; mill gave up.
Circ'd hole clean. RIH OE w/5" DP to 2557 (20' into stub).
Circ'd up hole. Pmp'd 30 BW ahead foll'd w/130 cu ft
slurry @ 16.5 ppg w/2% CaC12 & foll'd slurry w/6 BW & 34
bbls 10 ppg mud. CIP 1:20 p.m. WOC 8 hrs. RIH & brk
circ @ 2157 & 2294. Found top of cmt @ 2371. Couldn't
pmp off wt. PU & circ'd btms up @ 2370. CO cmt 2417;
good hard cmt. 6/12 Fin'd CO good cmt @ 2497 & circ'd
btms up. ?U new bit & DO cmt to 2537; hit 10-3/4" stub.
POOH; bit showed broken spts on outside row of teeth. PU
flat btm open hole 9-I/2" junk mill, x-over, 5 stds H~P,
jars, 5 stds HWDP & DP and R!H. Mill on stub; made 11' @
12 p.m. to 2548'. JUN 1 3 ~977
A-31-14
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
A-31-14
(AWS-1)
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31--14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @.2502'
A-3!-!4
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
TD 3620. PB 3186. Milled to 2.~9 & POOH. RIH w/bit,
Oyna drl, MC & jars. RU Sperry m tools & drld. Found
iron @ 2537 & down @ 2549. POOH. LD tools. RIH OE
w/DP & equalized 81 cu ft 16.5 ppg slurry, Class "G"
w/2% CaC12. Pmp'd 30 BW ahead & 6 behind & 34 bbls 10
ppg mud. POOH. After 4 hrs PU bit, x-over, 5 stds HWDP,
jars, 6 stds HWDP & DP & RIH to 2320. Circ'd btms up.
RIH & found cmt @ 2430. CO cmt (after WOC 8 hrs) to
2497. Had good cmt. Circ'd clean. J~ ~
Depth 2660; cut 158'. PU Dyna drl & jars & RIH. Oriented
tool w/Sperry Sun Gyro. Started drlg. Cmt had 17-1/2
hrs set'g time. Gyro survey @ 2532: 2532 - 2 deg 10" -
N73W, 2563 - 3 deg 30" - N81-1/2W, 2595 - 5 deg 15" -
N89W, 2627 - 7 deg 00" - S83W.
WO #528506 - $154,995 J0N 1 5 7977
Depth 2858; cut 198' Drld & surveyed to 2771. POOH &
made up dyna drl w/2'; kick sub. RIH & RU EYE tool,
oriented & dyna drld to 2858. Survey: 2679 - 9 deg 30" -
N84W, 2711 - 10 deg - N84W, 2771 - 10 deg 15" - N78W &
2837 - 10 deg - S88W.
Mud: (,520) 10 x 49 x 9 JUN" 1977
Depth 3067; cut 209'. Reaming @ 2800'.
Dyna-drilled to 2949'. Rigged EYE Tool. Dyna-
drilled to 3067'. Layed down Dyna-Drill, started
reaming.
Mud: (.525) 10.1 x 46 x 8 J-UN 1 ? 1977
Depth 3348; cut 281'. Drlg. Reamed from 2800-3067 & drld
& surveyed to 3247. POOH & LD 40 sgls 5" DP & chng'd DA.
Reamed from 3179-3234 & drld & surveyed to 3348. Survey:
3085 - 8 deg 45" - S16W, 3116 - 8 deg 95" - S9W, 3148 - 9
deg - S6W, 3179 - 9 deg 15" - S3W, 3234 - 11 deg 30" - S3E,
3285 - 11 deg 45" - S3E.
Mud: (.520) 10 x 45 x 7.6
Depth 3673; cut 325'. Run'g in DA. Survey: 3348 - 12 deg
15" - S3E, 3412 - 13 deg 30" - S7E, 3473 - 15 deg 30" -
S10E, 3538 - 17 deg 45" - SllE, 3601 - 19 deg 75" - S8E,
3673 - 23 deg - S1W.
Mud: (.520) 10 x 42 x 6.8
Depth 4013; cut 340'. Drlg. Reamed 3494-3673 & 3907-3938.
Survey: 3721 - 23 deg 30", S2E, 3814 - 24 deg 15" - S3E,
3907 - 25 deg - S1E.
Mud: (.520) 10 x 45 x 7.6 JUN 2 0 1977
Depth 4322; cut 309'. Dyna drlg. Survey: 4035 - 27 deg
15" - S2E, 4131 - 30 deg 15" - S3E, 4226 - 33 deg 30" -
S2E & 4322 - 37 deg 15" - S3E.
Mud: (.520) 10 x 40 x 7.4 ,,JU,N 2 I 1977
Depth 4454; cut 132'. Dyna drlg. Survey: 4353 - 36 deg
45~' S3W & ~ ~
- ~oSz - 34 deg - S5W.
Mud: (.520) I0 x 40 x 6.2
2 2
A-31-14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
116 ' DF
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
~'epth 4580; cut 126'. RIH w/fis~'~.g tools. Dyna drld to
~457 & POOH. P~de up DA & RIH ~ eamed 4322-4457. Drld
to 4580. Lost 500# pmp press & 12,000# on wt indicator.
PooH & found stab pin twisted off. Had 160' of tools in
hole; top of fish @ 4420. Made up Tri-State fish'g tools.
Survey: 4415-31 deg 15"-S7W, 4472-29 deg 15"-S12W &
4534-27 deg 45"-S17W. J0N 2 3 1~77
Mud: (.525) 10.1 x 41 x 5.4
Depth 4777; cut 197'. Run'g in DA. Circ'd & worked
overshot over top of fish @ 4420. Pulled loose w/50,000#
over normal wt. Pulled fish & LD fish'g tools. Reamed
4450-4580 & drld & surveyed to 4777; POOH. Survey:
4594-28 deg 15"-S18W, 4687-28 deg 45"-S19W & 4777-29 deg
45"-S19W.
Mud: (.525) 10.1 x 40 x 5.2 JUNg
Depth 4962; cut 185'. Drlg. Reamed 4700-4777. Survey:
4815-30 deg-S19W, 4909-32 deg 30"-S20W, 4962-33 deg 45"-
S21W.
Mud: (.530) 10.2 x 40 x 5.8
Depth 5142; cut 180'. Pull'g DA. Reamed 4900-4962.
Survey: 5065-36 deg 15"-S21W & 5142-38 deg-S23W.
Mud: (.530) 10.2 x 42 x 4.8
Depth 5402; cut 260'. Drlg. Reamed 5100-5142 & 5295-5375.
Survey: 5241-39 deg 30"-S23W & 5365-40 deg 15"-$23W.
Mud: (.530) 10.2 x 41 x 5.4 JUN ~ ? ~77
Depth 5556; cut 154'. Drlg. Reamed 5452-5551. Survey:
5494-40 de§ 45"-S22W & 5551-40 deg-S23W.
Mud: (.535) 10.3 x 47 x 6.4
Depth 5832; cut 276' Drlg. Survey: 5680-39 deg 15"-
S22W & 5807-39 deg i~"-S21W.
Mud: (.530) 10.2 x 43 x 6.2 JUN 9 1977
Depth 5979; cut 147. Drlg. Dev: 1-1/4 deg @ 5934'.
Survey: 5939-38 deg-S23W.
Mud: (.530) 10.2 x 42 x 6.4
JUN ~ 0 1977
Depth 6196; cut 217'. Drlg. Survey: 3998-39 deg-S23W
6092-41 deg 30'~-$24W '
Mud: (.540) 10.4 x 44 x 6.2 ~0L 0 1 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3./4" csg @ 2502'
Depth 6444; cut 248'. Drlg. Washed & reamed 20'; no fill.
Survey: 6320-44 deg 15~'-S23W.
Mud: (.535) 10.3+ x 46 x 6
Depth 6610; cut 166'. Drlg. Survey: 6499-42 deg 45"-S23W.
Mud: (.520) 10+ x 43 x 5.8
Depth 6908; cut 298'. Circ for survey. Survey: 6621-43
deg 45"-S23W & 6679-44 deg 30"-S24W.
Mud: (.520) i0+ x 38 x 5.8
Depth 7082; ~ut ~74 . RiH. Reamed 8-6908. Survey:
6908-43 deg 15"-$25W & 7082-42 deg-S .
Mud: (.520) I0 x 44 x 5.6 ~UL 0 5 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-!4
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 7436; cut 354'. Circ'g for survey. Washed &
reamed 7017-7082. Survey: 7312-40 deg-S26W.
Mud: (.520) 10 x 42 x 5.2 JUl 0~ ~97~
Depth 7643; cut 207'. Drlg. Survey: 7436-39 deg 15"-
S26W, 7530-38 deg-S28W & 7617-38 deg 15"-S28W.
Mud: (.520) 10 x 42 x 5.8 JUL 07 ?9??
Depth 7911; cut 268'. Drlg. Reamed thru tight spt @
4424'. Survey: 7806-35 deg 30"-S28W.
Mud: (.520) 10+ x 41 x 5.2
,JUL 0 8 '~977
Depth 8043; cut 132'. Drlg. Survey: 7961-31 deg 30"-
S28W & 8019-30 deg 30"-S27W.
Mud: (.525) 10.1 x 43 x 5.8
Depth 8255; cut 212'. Drlg. Survey: 8182-25 deg 45"-
S31W.
Mud: (.520) 10 x 46 x 5.4
Depth 8380; cut 125'. Drlg. Survey: 8385-22 deg 45"-
S3!W.
Mud: (.520) 10 x 47 x 4.8 ,~[ 1 ! ~77
Depth 8619; cut 239'. Drlg. Survey: 8428-20 deg 30"-
S33W & 8584-17 deg 30"-S35W
Mud: (.520) 10 x 43 x 4.8 JUL I 2 I977
Depth 8733; cut 114'. Drlg. Repl'd 6 bad jts HWDP.
Washed & reamed 30' to btm; no fill. Survey: 8728-15 deg
0"-$41W.
Mud: (.530) 10.2+ x 42 x 4.8 JUL ~ 8 7977
Depth 8986; cut 253'. Drlg.
Mud: (.572) 11 x 44 x 4.8
JUL 1 ,~ 1977
Depth 9044; cut 58'. Bld'g mud vol & wt. Unable to
determine accurate SIDP press due to float. Bld mud wt
to 11.2 ppg & circ'd w/200 psi chk press; lost returns.
Pmp'd 15 bbls 11.2# mud; could not hold any chk press.
Had gas & SW cut mud to sfc. Bld'mud wt to 11.4#;
returns never over 10.2 ppg. SI well. JUl 1 5 ~977
A-31-!4
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Circ'g we__ on chk. Opened well &
circ'd 160 bbls 11 4# mud; lost 21 bbls before get'g
returns. Cut to 10.2 ppg. Pulled 2 stds DP to get above
HC sd. Pipe free & well flw~g ~1 B/M. SI w/45 psi. Press
incr'd to 250# in 5-1/2 hrs. Mixed 300 bbls 11.4 ppg mud
& attempted to circ while holding 200 psi on csg; could not
get DP press. 11.4# mud going into rrm. Lost 35 bbls to
frm. SI w/200 psi. DP will not std full of 11.4# mud.
Mixed 60 bbls LCM w/12 ppg fine mica & fine nut plug &
spt'd on btm. Had 200# DP press incr & no CP response
while circ'g w/chk closed. Spt'd 2nd LCM pill; took 18
bbls to fill DP. DP press'd to 1000 psi indicating LCM
doing job. Mixed 3rd LCM pill. Could not hold more than
100-150 psi chk press. Mud cut from 8.6-10 ppg. Btms up
had some LCM. Wt cut to 10.3 ppg. Cont'd to circ w/ll.4
ppg; returns gas/wtr cut. Lost returns w/more than 100
psi chk press, DP free - up 280,000 & down 140,000.
Lost total of 470 bbls.
Depth 9044; cut 0'. Run'g Dialog freept. Circ'd out well
& started get'g sd, coal & wall cake, foll'd by good 11.2#
mud. After approx 120 bbls 11.2 mud, pipe stuck. Started
get'g 10.2 ppg mud. Opened hyd; well flw'g. SI well w/35
psi; DP std'g full of 11.4 mud. Worked stuck DP. Mixed
60 bbls LCM & spt'd on btm; no returns or press response
on csg. RU Dialog & found freept @ 5385.
Depth 9044; cut 0'. Circ'g well on chk. Mixed LCM pill
#5. Circ'd well across chk. Lost returns w/more than 150
psi chk press. Mud cut to max 8.5. Dumped 370 bbls 8.5
wtr; max wt back was 10.2 ppg. Lost complete returns
after pmp'g 1-1/2 annular vol; DP on vac. SICP 150 psi.
Circ'd well w/ll.2 ppg mud; returns cut to 9.5 incr'd to
10.2 ppg. Had DP press incr when LCM went out of DP. Now
holding 150-200 psi on chk w/constant DP press of 550 psi
@ 25 SPM. Lost +400 bbls fluid this date.
- JUL 1 $ ~977
Mud: (.582) 11.2 x 50 x 12
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. WOC. Circ'd well on chk; mud wt
was 10.4 ppg. Lost returns w/more than 150 psi chk
press; lost +--240 bbls mud to frm. SI well w/O CP & DP
std'g full w/ll.3 mud. CP blt to 175 max in 4 hrs. BJ
spt'd cmt on btm consisting of 200 sx "Gt' w/.75% D31 &
.2% D19, 16 ppg wt. Had 400 psi DP press incr while
put'g cmt into frm. Had final SI sqz press of 400 psi.
Overdispl'd DP 3 bbls. No press response on csg. CIP
@ 10:15 p.m.
Mud: (.592) 11.4 x 50 x 11.4 JUL 1 9 1977
A-31-14
(D) Platform A
9950' "G" Pool
!0-3/4" csg @ 2502'
Depth 9044; cut 0'. Well flwd 10 bbls. CP blt to 200
psi after 4 hrs. Had to circ thru DP; press'd to 2500
psi & could not circ. RU Dialog & R1H w/sinker ~ars.
Tag'd fill @ 8757. POOH. Ran Dialog freept; DP free @
5530 & 50% stuck @ 5550. RD Dialog & RU Dresser-Atlas.
SICP 200 psi.
Mud: (.582) 11.2
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. GIH w/per .... un. Ran Dresser-Atlas
CBL & mixed mud for cmt job. k~m Dresser-Atlas 2-5/8"
hollow-carrier gun w/magnet. Used 8 shots - 4 shots/ft,
180 deg, 22 grms. Tool stop'd @ 7673'. Worked gun from
7673-8542.
Mud: (.592) 11.4 & (.780) 15.0 x 56 x 8.8 JUl 2 1 1977
Depth 9044; cut 0'. WOC. Worked perf gun to 8600'.
Perf'd 8 holes from 8600-8608. DP on vac & 200# on
annulus. Pulled & RD WL. Found DP full of mud; no
indication of try'g to flw. Est pmp rate thru perfs @
6 B/M w/900 psi. Pmp'd 220 bbls 15# mud; holding 250#
on annulus w/rig pmp. Cmt'd w/300 sx Class "G" + .75%
D31 + .2% D19 w/16#/gal. Lost annulus press when started
displ'g cmt. When cmt reached perfs, press incr'd to
5000 psi; press bled to 3000#. Cont'd displ'g & press
gradually fell to 2000#. Displ'd cmt w/153-1/2 bbls
11.4# mud. Overdispl'd w/8 bbls. SI well; 0 press on
annulus & 100# on DP. CIP 1 p.m. 7/21/77. WOC & mixed
mud vol.
Mud: (.592) 11.4 x 50 x 8.6 JO[ 2~ ~77
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Run'g temp log. Well flwd 9 bbls
in 30 mins. SIP 110#. Pmp'd 2 bbls mud w/2700# @ 3.3
B/M; no incr in annulus press. Flwd 25 bbls from annulus
& SI. Had 80# press; incr'd to 140# in 30 mins. Mixed
11.4 mud. Annulus press leveled off @ 175#. RU WL unit
& ran temp recorder to 5207; tool stop'd. LD recorder &
RIH w/sinker bars & slowly worked bars to 5550 & POOH.
Displ'd DP to 8600' w/10.5 ppg @ 5 B/M w/3500 psi. Had
525# on DP after displmt; bled to 200#. Ran sinker bars
to 8600'. Ran Schl temp log from 2500'.
Mud: (.592) 11.4 x 43 x 8.6
Depth 9044; cut 0'. WOC. Fin'd run'g temp log from 2500-
8610'. Reperf'd @ 8602'. Est pmp in press @ 5 B/M @
2850 psi. Cmt'g: Pmp'd 220 bbls 15 ppg mud foll'd w/300
sx "G" w/.75% D31, .2% D19, 16 ppg. First 30 sx @ 14 ppg
fol!'d w/50 sx "G" w/.l% R5 @ 15.8 ppg. Displ'd w/ll.4
mud @ 7 B/M w/2400 psi. Last 18 bbls @ 1 B/M. CIP @
9:30 a.m. 7/23/77. Annulus press 0; DP press 850# & bled
off to O.
Mud: (.592) 11.4 x 50 x 10.2
Depth 9044; cut 0'. RU Dresser-Atlas to run CBL. Opened
hyd & watched annulus 30 mins; no flw. Closed hyd & pmp'd
20 bbls mud @ 6 B/M w/2000# press thru perfs. No press
on annulus. Took 1900# to break down frm. Opened hyd;
no flw. Placed 1000# on DP & watched annulus for flw.
Oil & gas breaking out of mud. Closed hyd & pmp'd in 30
bbls mud @ 6 B/M w/1800# press; no press on annulus.
Opened hyd & well started sli flw (4 bbls in 1 hr 20 mins).
SI well. Pmp'd in 20 bbls mud prior to cmt'g; no annulus
press. Pmp'd 250 sx Class "G" w/.l% R5 @ 15.8 ppg.
Displ'd w/138.5 bbls 10.4# mud, leaving 700' cmt above
perfs. Top of cmt @ 7900'. CIP 7 a.m. 7/24/77. RU
Dialog & ran sinker bars to 8596'; tool stuck. Worked
bars loose & POOH. ~l ~ ~
Mud: (.592) 11.4 x 48 x 8.2
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Dresser-A ~s had to rerun CBL because
film did not develop 1st time. RD CBL. Press'd DP.
Perfs brk dwn @ 2700 psi @ 5 B/M. Pmp'd in 9 bbls. Pmp'd
in 10 bbls @ 6 B/M w/3000 psi w/BJ unit prior to cmt'g.
Pmp'd 150 sx "G" .1% R5. Displ'd w/120 bbls 10.4 ppg;
w/lst 20 bbls very viscous. Displ'd @ 2 B/M. CIP @
6:30 p.m. 7/25/77. Approx top of cmt @ 6756'. WOC &
watch DP press. Press fluctuated betwn 1400-1600 psi.
Pmp'd 20 bbls in annulus last 24 hrs. After 6 hrs, bled
DP press to 500 psi w/very little fluid back. WOC.
Mud: (.540) i0.4 x 45 x 8
JUL
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Circ & cond mud. WOC 10 hrs w/500#
on DP. Bled off press & ran Dialog freept. Found freept
@ 2600'. Found some movement from 2600-5195'; tool
stop'd @ 5195. Ran sinker bars to 7300' (assumed top of
cmt). Press tested DP to 3300#, ok. Ran Sfc jars & jar'd
down 30 mins. Reran freept. Found pipe relatively free
to 4360; tool stop'd @ 4360. RU Dialog perf'g gun &
tested lubri to 1500#. RIH to perf @ 6750. PU Kelly,
cond mud & worked pipe. Ran mud thru chk 2 hrs; very
gassy. Cond gas cut mud for freept & backed off.
Mud: (.530) 10.2 x 42 JUl ~ ? ?977
Depth 9044; cut 0'. Mix'g spt'g fluid. Circ'd & cond
mud to 10 ppg. Dumped approx 580 bbls gas cut 'SW mud.
RIH w/freept. Found pipe free @ 5265, partially stuck @
5350 & completely stuck @ 5366. Used sfc jars 30 mins.
Reran freept; no chng from previous run. Started mix'g
black magic spt'g fluid. ~
Mud: (.520) 10 x 43 x 8 ~,, JUL ~ 8 M77
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-3!-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Soaking & working pipe. Pmp'd &
displ'd 105 bbls blk magic (168 sx) w/130 bbls. Boosted
2 B/H for ist 6 hrs & 1 B/H for next 4. Ran freept; pipe
free @ 5525', partially stuck @ 6100' & stuck @ 6150'.
Ran freept after soaking 18 hrs & found pipe free @ 5985',
fair movement @ 6100' & stuck @ 6150'.
Mud: (.520) 10 x 45 x 7.4 JUl 2 9 ?977
Depth 9044; cut 0'. RIH w/sinker bars. Found free pipe @
6050, movement @ 6100 & stuck @ 6150. Backed off pipe @
5813 & POOH. RIH to 5738 & circ'd up from btm. Screwed
into fish & jar'd 2 hrs. Ran freept; tool stop'd @ 5050.
Could not circ.
Mud: (.520) 10 x 42 x 5.2
Depth 9044; cut 0'. LD DP. Pushed plug inside DP from
5050-5910. Fill fall'g in below spud bars to 5877. RIH
w/freept; couldn't get below 4945. RIH w/backoff; could
not backoff @ 5844. RIH w/backoff #2; backed off @ 5813.
POOH chk'g DP; found cmt thruout inside of DP.
Mud: (.520) 10 x 42 x 5.2
Depth 9044; cut 0'. POOH. Fin'd LD cmt'd DP. PU 19.5#
Grade E #2 DP & RIH. Brk circ @ 3500' & RIH to 5825'.
Circ'd & cond mud. POOH for kick off plug.
Xua: (.520) 10 × tS x 5.S aUG 01 tg77
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502' -
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 9044; cut 0'. Circ & con~,mud. RIH OE to 5825.
Pmp'd 150 sx Class "G" cmt usi 20 bbls ahead & 5 bbls
behind; 16.5 ppg slurry. CIP 6:30 a.m. 8/1/77, Approx
top @ 5625. POOH, PU BHA & RIH to shoe. WOC. RIH after
12 hrs & found top of good cmt @ 5688. Circ & cond mud.
Polished off plug to 5703 after 20 hrs.
Mud: (,530) 10.2 x 48 x 10.4 (Oil 10%) hUG 02 ]97~
Depth 5770; cut 67'. Mix'g slug. Cond mud & added mil
plate to system. POOH to shoe. Ran frm strength test.
1st test press bled off @ 130#; 2nd test press bled off @
150 psi. R1H w/eye tool & drld w/dyna drl, Survey:
5743'-36 deg 30"-S26W.
Mud: (.520) 10 x 50 x 5.2 (Oil 6%) ~tlG 03 1977
Depth 5801; cut.31'. Chng'g BHA. Circ'd & pmp'd dry job.
LD dyna drl & RIH w/DA. Drld to 5801 & circ'd. Drop'd
survey & RIH to retrieve, but couldn't pull. Worked WL 4
hrs. Drop'd Kinley WL cutter; shot line off. POOH; had
tight spt @ 4675'. Totco ring bent & was sideways & stuck
survey.- Survey: 5770-35 deg-S29W & 5801-33 deg 45"-S32W.
Mud: (.520) 10 x 45 x 5.6 AUG 04 ]977
Depth 5801; cut 0'. Prep to POOH. Chng'd BHA & RIH to
top of dyna drl run @ 5709.. Lost wt on drl string & POOH;
left 205' tools in hole. Bit 92' off btm @ 5709; top of
fish @ 5504. Pin had twisted off btm of LOR stab. RIH
w/Bowen 7" grapple & pmp out sub on top of jars. Latched
into & worked fish free & POOH. LD fish & RIH w/drlg
assy to 5700 trying to work tools into hole. Worked &
reamed to 5742, but hole didn't seem right. Smpls showed
to have cmt in them; dry job.
Mud: (.520) 10 x 50 x 5.8
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' ~G" Pool
i0r3/4" csg @ 2502'
Depth 5875; cut 74'. Drlg. R1H & found sidetrack hole
@ 5718.
Mud: (.520) 10 x 45 x 6 (Oil 4%)
Depth 5899; cut 24'. RIH. Drld to 5899 & twisted off.
Pin twisted off new stab right below top DC; left 151'
tools in hole. Top of fish @ 5747. RIH w/Bowen overshot
dressed w/7" grapple; couldn't work over fish (approx 8'
above fish). POOH & chng'd fish'g assy. RIH w/bent sgl
workover fish & POOH & LD fish.
Mud: (.520) 10
Depth 6253; cut 354'. RIH. Survey: 5911'-32 deg 15"-
S34M, 6004'-33 deg-S35W, 6253'-36 deg 15"-S35W.
Mud: (.530) 10.2 x 50 x 5.4 (Oil 3%) AUG 0 8 1§77
Depth 6691; cut 438'. Circ'g for Survey. Tight spt @
6500'~. Survey: 637.5'-37 deg-S34W & 6547'-39 deg-S33W.
Mud: (.530) 10.2 x 48 x 5.8 (Oil 3%)
I 77'
Depth 6892; cut 201'. Drlg. Survey: 6691'-37 deg 30"-
$34W & 6779'-37 deg 30"-S35W.
Mud: (.530) I0.2 x 41 x 5.6 (Oil 3%)
1 0
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" Csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 7020; cut 128'. Ready to pull eye tool. Picked
up Dyna-Drill RIH. Set seeing eye tool @ 6969'. Shorted
out. POOH. Rewire head & ran back in to finish Dyna-
Drill run and drilled to 7020'.
Mud: (.503) 10.2 x 43 x 5.2 (Oil 3%) ~.U~i I 197T
Depth 7089; cut 69'. Drlg. POOH w/eye tool. Chng'd BHA.
Survey: 6892'-37 deg-S37W, 6969'-37 deg 15"-S37W, 7020'-
37 deg 45"-S32W, 7055'-38 deg 15"-S32W.
Mud: (.530) 10.2 x 43 x 5.2 (Oil 3%) ~.UG 1 2 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ '2502''
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 7226; cut 137'. POOH. Survey: 7153'-38 deg 45"-
S30W.
Mud: (.530) 10.2 x 41 x 5.2 (Oil 3%)
Depth 7326; cut 100'. RIH. Survey: 7226'-38 deg-S26W,
7275'-37 deg 30"-S24W.
Mud: (.535) 10.3 x 43 x 5.4 (Oil 3%)
Depth 7527; cut 201'. Drlg. Reamed 7266-7326. Survey:
7306'-37 deg 45u-S21W, 7326'-37 deg 30"-S22W, 7435'-38 deg
30"-S19W, 7475'-38 deg 30"-S21W.
Mud: (.535) 10.3 x 42 x 5.2 (Oil 2.5%) ~O~ 1 5 ]977
Depth.7778; cut 251'. Test'g BOP stack. Survey: 7621'-
39 deg 30"-S21W, 7778'-41 deg 15~'-S18M.
Mud: (.530) 10.2 x 43 x 5.8 (Oil 2%) ~.U~I G ~
Depth 7960; cut 182'. Fin'd wiper run. TeSted hyd, rams,
valves, etc., .all ok. Chng'd BHA & R1H. Drld to 7960 &
made 9 std wiper run. Survey: 7928'-36 deg 45"-S21W.
· Mud: '(.530) 10.2 x 45 x 5.4 (Oil 2%)
AUG 1 7 ~
Depth 8148; cut 188'. R1H w/new bit. Survey: 8085'-
32 deg 30"-$21W, 8148'-30 deg 30"-S22W.
Mud: (.540) 10.4 x 46 x 5.2 ~.U~
Depth 8366; cut 218'. Drlg. Drlg brk @ 8338-8353; chk'd
for flw. Still in drlg break @ 8366'. Survey: 8303'-
27 deg-S22W.
Mud: (.566) 10.9 x 50 x 5.6
RUG 1 9 1977
Depth 8574; cut 208'. Drlg. Short trip @ 8460'.
Mud: (.566) 10..9 x 50 x 5.8 x 600.
Depth 8745; cut 171'. Trip to Shoe. Finish out of hole @
8574'. Strap in hole. Pipe stopped @ 5718', worked thru
ok. 5' drilling break @ 8678. Drilling break from 8704-
8735. Drilled to 8745. Circ up from bottom.
Mud: (.566) 10.9 x 48 x 5.8 x 600.
Depth 8745; cut 0'. Mixing mud & LCM. GIH. Bit stopped
@ 5718'. Worked bit thru. Circ & cond mud. Layed down
B~. RU & ran 75 jts 7-5/8" P-Il0 33.7# LT&C casing.
Top hinge on elevators broke dropping 3150' casing to
5724~. Top of casing @ 2574'. GIH & latched onto fish
@ 2574. Started pumping w/no returns. Pumping LCM.
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
~epth 8745; cut 0. Waiting on B~gck Magic. Pumped 150
of Hi Vis LCM in annulus (10.3 ppg). Started pumping
& getting partial returns. Disp hole w/10.3 ppg from
2574' to surface (had 10.9# in hole) w/full returns.
Spear into fish and circ @ 75% returns around fish.
Pump 113 bbls Black Magic. Jarring on fish every 10 min.
Had 90+% returns while displacing Black Magic.
Mud: (.535) 10.3 x 43 x 5.8 ~ ~ ~ ~7~
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 8745. Laying down. 7-5/8" csg.
Worked stuck pipe, Boosting 2,bbls/hr. Total of 5 hrs.
Speared into fish. Jarred on fish. Fish came loose
after 19-3/4 ,hours. POOH to lay down casing.
Mud: (.535) 10.3 x 5.8 ~[IG 2 & 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
i0-3/4" csg @ 2502'
Depth 8745'. Cond. hole. Left 2-1/2 centralizers
in hole, PU BHA, GIH 'to shoe. Built mud wt to
10.9 ppg. Had small loss when mud wt was increased
to 10.7. Added LCM. Did not find centralizers.
Mud: (. 566) 10.9 x 48 x 6.0 B!.l~ 2 ~ tB77
Depth 8745. Circ for csg. Circ @ 5685'. Worked
pipe from 5695-5761' Cond mud @ 6788' 7891'
& 8632'. Clean out from 8632-8745'. No indication
of junk. Made 15 std short trip.
Mud: (.566) 10.9 x 50. .~!.1~ g 8 ~77
8/26: Depth 8745'. Trying to get 7-5/8" csg in hole.
Running csg. Pipe stopped @ 5741'. Worked & torqued~pipe,
Broke circ @ 5623'. Singled in @ pump to 5741', Could not
get by fork.
Mud: (.566) 10.9 x 48 x 5.6
8/27: Depth 8745'. Ream & Circ @ 3007'. POOH. Layed down
7-5/8" csg. Worked csg by tight spot @ 3469'. Probably piece
of broken centralizer. PU C.P. GIH. Pipe stopped @ 3007'.
Mud: (.566) 10.9 x 45 x 5.6
8/28: Depth 8745'. PU B.H.A. Drilled by iron @ 3007' &
4465'. Cond mud @ 5685. Losing mud. Cut mud wt from 10.9
to 10.6. GIH to 7216'. Broke circ in to 8745'. Cond mud wt
10.6. POOH.
Mud: (.551) 10.6 x 45 ix 5.6
Depth 8745'. GIH. GIH hit tight spot @ 3181, worked
through (indication of iron) to 5748'. Reamed from 5748-
5899'. Top stab. stopped @ 5343. Reamed from 5343-5759.
Pulled to 5600'. Reamed upper stab. POOH. Tight spots
@ 5391 & 3059'. Changed B.H.A.
Mud: (.551) 10.6 x 45 x 5.8 ~]6 3 0 1977
Depth 8745; cut 0'. PU BHA, Reamed 5751-5930. Top stabs
@ 5572-5730. LD 3 sgls & rereamed 5551-5730. POOH. PU
shoe & 3 its 7-5/8 csg & RIH for dummy run. Did mot hit
shoulder; ran csg to 5784. Pulled up & made 2nd run; pipe
went ok. POOH.
Mud: (,551) 10.6 x 48 x 5.8 (Oil 4%) AOG~ I ~977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
Depth 8745; cut 0'. Circ'g hoi, & unload'g csg. Made
up BHA & RIH. Found bridge @ 6652; washed & reamed thru.
Circ'd btms up. RIH & found another bridge @ 7120; washed
out. Fin'd RIH to 8745 & circ'd & cond hole. Made wiper
run thru bad spts; hole seems ok.
Mud: (.551) 10.6 x 52 x 5.6 (Oil 4%) SEP O1 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
She!l-A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
DePth 8745; cut 0'. Working csg @ 5716'. Unloaded csg &
POOH. Ran 7-5/8" csg to 5716'; couldn't get thru bad spt.
Circ'd csg while applying torque; could not get below
5716' .
No mud SEP 0 2, 1977
Depth 8745; cut 0'. RIH. Could not work 7-5/8 csg thru
bad spt @ 5716. While POOH, hit tight spt @ 3094. RIH &
circ'd @ 3005 & 5685. Found fork @ 5709' & had to rotate
into right hole.
No mud
Depth 8745; cut 0'. Run'g csg. RIH to 8745 & circ & cond
hole. Had tight spts @ 3100'. PU 7 its csg; btm jt w/sml
bend. RIH & found fork @ 5709; worked pipe 3 times, then
went into right hole. POOH. RIH w/csg.
Mud: (.556) 10.7 x 50 x 5.8 (Oil 4%)
Depth 8745; cut 0'. NUo Found fork @ 5709. RIH to 8745
& pipe took wt. RU BJ; took 1550 psi to brk circ. Lost
circ after pmp'g 20 bbls. RU to cmt & pmp'd 15 BW. Pmp'd
total of 505 sx Class "G" w/.75% D31, .2% D19 & .1% D6
(15.8 ppg). After pmp'g 75 bbls, had good returns. Displ'd
@ 10 B/M & last 20 bbls @ 6 B/M. Overdispl'd 10 bbls.
Did not bump plug. Float & shoe equip held ok. Shoe @
8745 & FC @ 8653.
No mud
Depth 8745; cut 0'. PU DP. Tested BOP, kill line, valves,
chk line, all rams & chk manifold to 3000 psi. Tested
annular preventer to 1500 psi. Test witnessed by D.O.G.
Mud: (.556) 10.7 $EP 06 1977
Depth 8745; cut 0'. RIH. Fin'd PU 3-1/2 DP. Found
.hard cmt @ 8499 (154' high). CO to FC & tested csg to
2500 psi for 20 mins. CO to 8696 & POOH to chng bit.
Mud: (.535) 10.3 x 45 x 8.6 (Oil 3%)
SEP 0 ? 1977
Depth 8785; cut 40'. Drlg. CO shoe @ 8745 & made 11'.
Blt mud wt to 11.5 whil drlg. POOH & chngd BHA. RIH &
circ & clean to btm.
Mud: (.598) 11.5 x 45 x 6.2
SEP 0 8 1977
Depth 8981; cut 196'. Bld'g mud wt on chk Survey: 17
deg @ 8845'. '
Mud: (.598) 11.5 x 43 x 5.4 (Oil 3%)
S£P O 9 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
.... ~epth 9088; cut 107'. Drlg. $o'~eY: 15-1/2 deg @ 9023'.
.~ud: (.650) 12.5 x 48 x 5.4 (0~ 3%)
Depth 9185; cut 97'. Drlg.
Mud: (.650) 12.5 x 43 x 5.4 (Oil 2.5%)
Depth 9264; cut 79'. Servicing DC's while WO 'fish'g tools.
Drld to 9264 & bit quit; POOH. Left bit & lower box &
sleeve. SEP 1 2 7977
Mud: (.650) 12.5 x 44 x 5.6 (Oil 3%)
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
Depth 9264; cut 0'. POOH. Made up basket grapple for
3-3/4" fish. RIH & couldn't work over fish; POOH. Welded
on lip guide on fish'g skirt & RIH. Latched onto fish, but
slip'd off. Made up sml'r grapple (3-21/32), RIH & latched
onto fish. POOH; rec'd fish.
Mud: (.650) 12.5 x 44 x 5.6 (Oil 3%)
Depth 9308; cut 44'. Drlg. Fin'd POOH w/fish. LD tools
& made up BHA & RIH.
Mud: (.650) 12.5 x 46 x 5.4 [Oil 3%) SEP 1 ~. ]977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ '2502'
7-5/8" csg @ 8745'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
Depth 9396; cut 88'. Retrieving survey.
Mud:-. (.650) 12.5 x 45 x 5.6 (Oil 3%)
Depth 9446; cut 50'. Drlg. Retrieved survey; no good.
Mud: (.650) 12.5 x 44 x 5.2 (Oil 3%)
SEP 1 ~ 1977
Depth 9551; cut 105'. Drlg.
Mud: (.650) 12.5 x 45 x 5.2 (Oil 2%)
Depth 9600; cut 49'. Drlg. Survey: 18 deg @ 9592'.
Mud: (.650) 12.5 x 45 x 5.4 (Oil 1%)
Depth 9655; cut 55'. Log'g. RU Schl & ran SP/GR/DIL/LL8.
Mud: (.650) 12.5 x 48 x 5.2 (Oil 1%) $£~1 ~ ]977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
A-31-14
[D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-i/2" csg @ ~546'
Depth 9655; cut 0'. Circ'g for liner. Fin'd run'g SP/GR/
DIL/LL8 from 9652-8745. Ran GR/BHC-Sonic/Cal from 9652-
8245. Ran GR/CNL/FDC/Cal from 9646-7200.
Mud: (.650) 12.5 x 45 x 5.2 (Oil 1%)
Depth 9655; cut 0'. WO dialog unit. Cond mud for liner.
Drop'd Sperry Sun multishot & surveyed ea 93' from 9655-
8745. Made wiping run to shoe & retrieved multishot.
Circ'd btms up & POOH for liner. Ran 27 its 5-1/2" N80
17# SFJP liner. Made up liner hanger& tie back sleeve.
R1H w/3-1/2" DP to shoe & made up cmt manifold on sgl.
Fin'd in hole to 9643 & circ'd & washed liner to 9648. PU
liner to 9646 & circ~d open hole clean. Drop'd ball &
set liner w/1800 psi. Press'd to 3000 psi & could not
shear seat in landing collar. Press'd to 5000 psi, then
5800 psi when pack off cuos started leaking.
Mud: (650) 'o ' SEP 2 1 i977
· ~.5 x 45 x 4.2
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
~--~Depth 9655; cut 0'. LD set'g t~ol. RU Dialog & RIH &
perf'd ten 180 deg holes from ~7-9554. POOH. Made up
Bkr Mdl K drillable ret & set in top of liner @ 8505'.
Tested lines & DP to 5000#. Press'd to 5000# twice, then
perfs brk down. Circ'd & cond mud. Cmt'd 5-1/2 liner
w/200 sx cmt thru Bkr ret leaving 250' cmt above perfs &
200' cmt fill above top of hanger. CIP 9:15 p.m. 9/21.
POOH & LD ret set'g tool. SEP 2 2 1977
Mud: (.650) 12.5 x 44 x 4.2
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @'9646'
A-31'14
(D) PlatforTM A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
Depth 9655; cut O' POOH. Circ'd & pretrt'd mud for cmt.
RIH to 8073 & circ~d btms up. Found top of cmt @ 8079;
hard cmt @ 8169. CO cmt from 8169-8485 & circ'd hole clean.
Tested lap to 2000 psi 15 mins, ok.
Mud: (.650) 12.5 x 42 x 3.8
Depth 9655; cut 0'. Trip'g. RIH w/4-3/4 bit & 3 jts pipe
& drld on ret. POOH for mill. RIH & tried to mill on ret.
Could not keep wt on mill due to so much drag on slim
hole pipe. POOH.
Mud: (.650) 12.5 x 47 x 6.6
Depth 9655; cut 0'. RIH. Fin'd mill'g ret @ 8505' & POOH.
PU 39 j ts 2-7/8 & RIH; showing ret & possibility of liner
wiper plug down hole. Pipe stop'd @ 9035; worked plug to
9099. Mill'g on iron; POOH. Mill flat & ringed out. PU
11 3-5/8 DC's & RIH.
Mud: (.650) 12.5 x 47 x 6.5
Depth 9655; cut 0'. RIH w/bit. RIH w/mill #2 & milled &
worked on iron. Milled 1-1/2' & mill stop'd. POOH. RIH
w/impress blk & set down w/60,000# wt. POOH; no impress on
b lk. , EP 2 1977
Mud: (.650) 12.5 x 49 x 6.2
A-31'14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
Depth 9655; cut 0'. Dr!g cmt. Milled on iron; bit brk
thru to 9130. Drld cmt from 9130-9335 & POOH for bit.
RIH & drld cmt from 9335-9400'. SE? ~ ? 1977
Mud: (.650) 12.5 x 50 x 6
Depth 9655; cut 0'. Run'g cmt bond log. Drld cmt to
9450. Tested 5-1/2 liner to 1000# 15 mins, ok. Drld cmt
to 9512' & POOH for new bit. RIH & drld cmt from 9512-58.
DO landing collar & circ'd btms up @ 9602. POOH.
Mud: (.650) 12.5 x 50 x 6 SEP 2 8 1977
Depth 9655; cut 0'. Mill'g on tie back. Ran Schl CBL &
hung up in top of liner. Pulled tools free & POOH w/WL.
Left centralizing std off pad in hole (12" long -.4" OD by
3-7/8 ID SS sleeve w/rubber pads). RIH w/4-3/4 bit to
9601. POOH & chng'd pads on WL tools. RIH & got bond
log. POOH & RD WL. RIH w/7-5/8 Bkr scraper & made 2
passes on interval 8100-8485; dry job. POOH. PU mill &
RIH~
ud: (.650) 2.5 × 4S $£P 977
~A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
_~Depth 9655; cut 0'. Run'g WL J~k basket. Fin'd mill'g
:ie back sleeve. RIH & set pkr .e back assy; top @ 8474.
POOH & LD tools. RIH w/4-3/4 bit & csg scraper. DO alum
bull nose guide in tie back seal assy & worked thru to
9601'~ Circ'd btms up. RU Schl. $EP 3 0 1977
Mud: (.644) 12.4 x 46
Depth 9655; cut 0'. Run'g tbg. Ran WL Junk basket to
9599 & POOH. Set Bkr Mdl K cmt ret plug for 5-1/2 csg @
9547' (top) & POOH. Tested csg to 2000#, ok. RIH w/OE
DP to 9547 & rev'd out mud w/900 bbls clean inj wtr. Spt'd
25 bbls KC1 solution in liner. POOH & LD 2-7/8 DP & RIH
w/new 3-1/2 tbg.
Depth 9655; cut 0'. POOH. Ran tbg; top of Guiberson pkr @
8460'. Circ'd tbg clean.. Drop'd ball & set pkr @ 1700#.
Raised press to 2300# to set pkr better, but shear sub
sheared too quickly & pkr wouldn't hold. RU WL & pulled
ball valve. Could not reset pkr; pulled pkr loose @
120,000#.
Depth 9655; cut 0'. Prep to POOH. Redressed pkr & RIH to
drop set'g ball, but couldn't get to btm. Pulled to ball
valve, then rotated tbg & pulled total of 7 stds; pull'g
wet - ball had come unlodged. RIH & set pkr @ 2000# &
press'd to 2500# 15 mins. The blown out shear sub @ 3000#
had a big recoil in press surge & pkr wouldn't hold. Prep
to POOH to repair pkr. 0~ 0 ~ ~77
Depth 9655; cut 0'. WO packer. POOH w/Guiberson pkr; pkr
had sheared when press surge hit it. Repress'd csg to 2000
psi 15 mins; no leaks. 001 04 ~77
Depth 9655; cut 0'. Work'g on tree & flwlines. PU new
Guiberson pkr & RIH. Spaced out pkr @ 8460. RU WL &-
pulled ball valve. Set equaliz'g prong in x-plug & POOH.
Press set pkr w/1360 psi. Raised press to 3000 psi 15 mins.
RIH w/ICL & pulled equalizing plug, then x-plug. Tested
pkr & liner to 2000 psi 15 mins, ok. RD WL & installed
BPV. Installed tree, auto SI valves & chk.
OCT 0 5 ~977
Depth 9655; cut 0'. Gas lift'g wtr. Installed tree &
tested to 5000 psi. Installed flwlines & gas lines &
tested. O~,T 0 ~ 1977
Depth 9655; cut 0'. Perf'g. Fin'd gas lift'g wtr to 5th
gas lift mndr!; total of 304 bbls. RU Dresser Atlas &
perf'd w/2.6" slim line steel hollow carrier loaded w/12.5
grm golden jet chrgs (0 phased) w/magnets @ btm of'gun
4 holes/ft (had to shoot 8' high). Run #1 HR/HZ (9513-
9534), Run #2 HR/HZ (9492-9513), Run #3 HR/HZ (9473-9492),
Run #4 HR/HZ (9438-9459). Flwd well betwn runs & while
perf'g. No test rate established. OCT 0 ? 1977
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
-.. Depth 9655; cut 0'. Test'g HR/~HZ. Run #5 HR/HZ (9417-9438)
& Run #6 HR/HZ (9408-9417). [ 'd perf'g & placed well on
test @ 2 p.m. Test @ 11:30 p.m. showed 264 B/D gross w/.2%
cut, 75#' FTP, 570# CP, inj'd 923 MCF/D & 1000 MCF/D returns.
Depth 9655; cut 0'. Perf'g. Fin'd test'g HR/HZ. RU
Dresser Atlas & cont'd perf'g @ 4 shots/ft. Run #7 HN-HR
(9363-9384) - last 2 chrgs on btm of gun didn't fire. Run
#8 HN-HR (9342-9363).
Depth 9655; cut 0'. Test'g. Cont'd perf'd HN-HR: Run ¥/9
(9335-9342), Run #10 (9300-9321), Run #il (9279-9300), Run
1977 #12 (9260-9279). Had trbl get'g by X-nip & had to work WL
several times on ea run. to get back into tbg. Starting
test'g HN-HR & HR-HZ zones; 1488 B/D gross w/5.5% cut, 90#
FTP, 735# CP, 578 MCF/D prod gas & 912 MCF/D inj gas.
A-31-14
(D) Platform A
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
Depth 9655; cut 0'. Prod'g well ahead of Run #17. Fin'd
test'g tIN-HR & HR-HZ. RU Dresser Atlas & perf'd HK-HN
using same type gun & procedure. ~Perf'd HK-HN as folls:
Run #13 - 9225-9246 (2 shots didn't fire), Run #14 - 9204-
9225 [btm chrg didn't fire), Run #15 - 9183-9204, Run #16 -
9180-9183, Run #17 - Couldn't get thru X-nip. POOH & prod
well awhile, then will try again. 0Cl 1 1 1977
TD 9655. PB 9547. Prod'g well. Run #17 - perf'd HK-HN
9104-9121. Had to Work thru X-nip going in & coming out.
Perf'g complete. Tested well; prod 1640 B/D gross (3.4
cut), 1584 BO/D, 956 MCF/D inj'd, 664 MCF/D gas w/100# FTP
& 780# CP. GOR 419. .Released rig @ 6 a.m. 10/11/77.
OCT 1 ~ 1977
A-31-14
(D)
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
A-31-14
(~)
9950' "G" Pool
10-3/4" csg @ 2502'
7-5/8" csg @ 8745'
5-1/2" csg @ 9646'
TD 9655. PB 9547. Prod'g well.
(Report discontinued until test established)
TD 9655. PB 9457. (RRD 10/13/77) OIL WELL COMPLETE.
On 24-hr test 10/13/77, gas lifted 1793 BO, 27 BW & 858
MCF gas w/1417 MCF gas inj'd & 100# TP & 800# CP from
HR-HZ perfs 9534-9408, HN-HR perfs 9384-9260 & HK-HN perfs
9246-9104. GOR 479. Oil Gravity 35.9 @ 60 deg. Completion
Dat~:~ 10/11/77. Test Date: 10/13/77.
Log Tops:
MD TVD
HC 8810' 7906'
HD 8907' 7999'
HE 8953 ' 8043 '
HF 8985' 8074'
HI 9053 ' 8139 '
HK 9104 ' 8188 '
HN 9249' 8327'
HR 9384 ' 8456 '
PBTD 9547 ' 8612 '
HZ 9550' 8615'
TD 9655 ' 8715 '
FINAL REPORT
OCT ! ~ i97';;
SHCLL OIL CFI-FtLFI.]'KFI ~31-14
itETHDD n~ CDi'~PUT~IT I~qH
'.5. iJ R :v' E '," B Fi T Fi
i,EFi.Si_l~.:E D DE:,.' I FIT I Dit :¢ERT I
BEF'TH DRIFT DRIFT DEPTH
' (BDF) r...qi'.l,3 L E BIRECTIDH
LRTERRL DEFLECT I DH
FF'E]i'I .SUF.:FRC:E LDC:FITIDi'.I
i'.,! EIR .S 4- ) E D R i.:! ,:: -::,
DOG LEG
E G ..... 1 ,] 0 ")
" O -- 0
.... 75 ' 0
100 . 0
.. 1~5 ''- 0
lS 0 0
..7' ' 175 . ;- :; ,'~:- 0
·
200 O
.~ 225 . . ' 0
.... 2.'-"";_ ,..q ='- 0
27:5 0
'.30 O 0
· .]:2 0 O
417 ' .3
--;14 3
· 607
66?
73 0
;=: ,-' .5
916
1 009
ii 01
! .5 :D .D
154 0
1A~:,S
.
1 ;3 0;5: '
1 '=-.-',, ~
~ 1.34
2563
~, ,.-'9
2771
2 ;-3, .30
2 ;:-; ;:', ;3
2949
3019
.;: 06 ?
.3035
3116
31,4 ;3
.3179
_=:2 34
..:; d ;55
· 3 ]; 4 ;3
.--I 4. I =,
360 t
0
1-%
81
4 ;::
1-%
3 0
3 3 0
~ 0
2
2 IS
--, 1=,
0 4-3
.0 1-~
0
1 .30
0 4s
0 0
0 4s
0 · .4--;
=' 10
.~ .30
7 0
9 ""0
I 0 0
10 1-%
9 45
9 25
9 0
9 0
9 0
· --' 4.--_,
'-' 45
9 0
9 t=,
11 3 :]
~! 45
t:'~_
! .3 .30
O. 0
75 · 0
I 0 0.0
12-%. 0
15 ,]. 0
175.0
2 00. ,9
:'= 0
2.:'5 0 · O
27--, · 0
~ 0 ',] 0
32 O. 0
416.9
rS 13 '-'
606,6
6bb..~,
,--' 2 9 · 4
;32 4..3
91 ,-%..3
1 0 0 ;3.2
Ii00.~.:'
122;.]:. 2
1.35~. 1
15.39.1
166~.1
1 ;3 ',] 7.1
1977.1
213.3.1
,-',-"~ 1. O
,--'447.0
? :531.0
2 :-"~ F,,='. 0
,:' 6, 77 . 1
C-'7 FI ;3 . 7
,:' 76, 7.8
,.... ~:,, d .-_,..~
~";:", ;d .-', · 0
2-' 943.3
3013.4
· 3059.3
3 r~ 77.6
· 31 0:3.2
· 3 1.3':~ '-'
· 3 i 7 0.5
322'4 .E
-'-'Ta .-5
:,~i , ._
· 5:.39 .~,.
d. '~ ? :=,. -D
· =:-% I '3. 5
,5 -J ," '~ · Z~
3646.6
0 · 0
0
O. 4
:). 4
0.4
0,3
'0, ~
1.1
0,9
0.4
0.5
0.5
0.9
0.6
0.3
0.4
0.6
0.5
0.5
0.3
4.6
6.4
m
0. C,
3. G
· 3 · 4
1.6
0.5
O. :3
~ 4
- /
. ·
3-'314
·
39 OZ
4O35
41~I
.
4353
4302
4415
44?2
'45.}4
45'94
4E, 8~
4~7~
481 =3
49 09
4'96~
506~
.'~ 5142
5241
5494
5680
~:301
5P11
600~
6547
66'91
696'9
715.3
7275
7306
7326
7475
76Z1
7773
;3 03 5
8148
8.303
846 0
;374 ~
8803
'3 ~ 75
9 ~ 6 ;3
~36 l
94~4
'P54~
,.,_-_. 0
· ,:.~-' -' .30
,--'4 I-7
.'-'5 0
`27. 15
-30 15
33 .30
3,-'"' 15
.36
34
._--:! IS
2'9 15
_'~
2, 45
2;3
2;3 45
2'3 45
3 0 0 .
-Z,,' .:, ,_l
.:,,> 4.5
36
· 3-P -3 0
40 15
40 45
4 0 0
3'9 IS
3'6 .30
3.-3 0
33 45
.:-:2 1'-',
3.3
· -':6. 1 --,
37 0
.--: 9 0
37 .3
37 30
37 0
.--:7 I--,
37 45
._-,c,I ._'5
5-D 4='
33
2,7 .--: 0
· 37 4~
33 3
---:3 ._,
· _-':9 .--: 3
41 i-~
36 4:--;
32 .3 0
· 3 :'J 30
:' ~ 0
17 15
17 30
I,-: 0
i; .3
15 .45
1 ,.";]
17 15
I ? 30
17 -20
$
.-.-.:
S
--.
,.
--.,
.b
-,
.S:
S'
-o
.b
.'_7
,:T::
3
.?
.~:
3
.S
S
3-'
S:
· S .3 r_.
S I E
3 .3 E
S .3 E
,2 E
· 3 E
· 3 i.d
-5 i.,.i
7 i:J
1,._:' i,I
17 W
! ;3 iii
1 '3 i.d
1'3 i.d
19 i.,.I
2 0 i.d
:'1
~ 1 li,,.I
,--'3 i,J
;:'5: i.J
`2._--: i.d
-,"
`2._--: i.,.i
2,-" b!
26,
2') W
.:-~4 b.I
· 35 iai
...35 id
34
3.3
34 bj
.S 35
.'--: ..37
.S 5:7 i.,.I
.~ ..32
· S: .':-:2 i.d
.Z--: 2f:, i,~
:'_-.: ,24
· Z.: 21 W
.'--.: ,2,=. i.d
.'_?. i'~
~ :'1 i,I
I,,.- ..
· "--: :'1 id
S l':',_, i.d
S: 21 i.d
· ~ 21 i.d
S 2.3 i.J
S -'-' ~.,.1
,'..3
· "-': 3 L]
.S: .33
.'--q rq:'l hj
~ -'-',-'-; ,,{
S 6 :-_-;
.? 7'7 ,,t
= ._:; ;_]
;' :~: .:'
· S :32 'd
-,, -. -.
]:6,46,. 6
36'? O .7
'-'75 7
,2, i'
· 3;_::60. 2
· :-: 9 75.2
40 -~.9.3
414 0. ,9
421;3.2
42 4.3. O
4,:':.'66.6
42'9-4,4
4.34.3 · 7'
4.3'P ;E;. 1
4451 .1
45.32.9.
46,11.4
4644.3
4724.7
4769.1
4 ;35.3 · 4
4'914. '~
4992.0
S 0:37.2
51 ;3 ::3.._--:
.-_, ~ ~ ;:: . ,.'
rq.--: 2 ;q. 1
537 7.. 3
53'P'3.7
5425. J:
.... 17.5
55'95,9
5;3 O O. 7
.9 ;:: '.q. ;:: · 7
60-:. 4.2
6147..--;
6217.1
6,.--: 07. O
6.360.4
6,4 0;3 "3.
64 .]-: 6.. 5
6.5 1 .]-:. 2
6570.4
6609.1
66.33.7'
' 664':¢..o
~.,.. o., 4
6766 .?
~:,;:: ;:: ;ii. 2
~:,'q '-9 .z4 .:,
_ ..... ·
,.-' 1 16..3
7' 24 ,_., ....
7" 29 9.2
74.3=-;. 1
f' ii" f'
"6, ,3 ,:'.. 3
7 C-: 44.3
,':: :_:: '9. 'P . 7
...., ..,,.~
:3:1, ," ,' . 3
:3167 . 1
;::', 2 .-i ~:,. ,4
33 J- -";. ,_'6
:34 ]-: 4.5
:3523.2
361:,_.
·
- 132.2
-1--11 .2
-- 1 ;z;,:,. o'-'
-22,--' ,5
- 28 3. ;3
-"-'Fi 1
-4.35.6
-4~4.2
-4,.-"1 .O
- 48~3.6
-517' . O
-.545.6
i" ,'- .-~'
-614 .~
-656.1
-674.0
-7'2 0.0
-7'47'. 1
-;302, .3
-;345,. 3
.o ,J,- . 4
-975,6
- 1 053.0
- 1 :];E.:?, 1
-1163,1
- 1198,4
ale .4
-1227 .--,
- 1277. , 7
- 1.2:19,0
- 14._::4,9.
- 14'9. 4,9
- 1 .--~ ;::.3,2
- 165?. 5
-1 ?L]I .,.-'
- 1757,0
-1794.1
- 1 ;--: 19,7
-1'-' '~'-' 0
,2 ._-, ,_~ .
- 139 0,.3
- t 'P..30, .'~
· - 1 '.:'..-_-; 7, .-_'3
- 1 P 96,3
-2 049.2
-2072 .c,
-21 .-"3,::, .2:
- 2.2: 4.3,1
-,_-" 426 . 4
-2457. :21
-,--'~26,1
-- ,-' -Z, ;_-: ," , ¢'
- 2677 ,-3
-369a, 1
-.- i4 .?
-,_:' 7' 3 .'_':, 3
-.-, ~.a
-37'61 , 3
--~ ,.' ,.. C~ ,, ..:,
-£?79.6
-- 1 U
I 00. 6
"--' -9'3. O
-97.6
-95.6
-9.--:. 2
-91
-;3;:-;. 6
-;q;::. 6
'-;3'P.
-91
-96.4
- 1 {'l.< --'
-112 ..3
- I2~ ..7
-14,0.7
-146 -'
-163.1
· ,'- 1 ,'-'3,2
-194.4
-211..3
-2.36. O
-26,v .1
-2'99.. 2
-.:, 1.3 ..
-344.
-3 6 ," ·
-.37. 6.7
-4 3 ,'-'. 7
-5 1 ;3
- 56 :]. 3
-61 ;::. -:,
-66.7.7
- 6'P ;3.0
'- ¢ -Z, ,Z, ,, ~Z~
-766.2
- 7, C-: .3.
-795.2
-;326.6
-;347 .
-:_:: 60. 6
-- 'D -, ¢ = ,--'
--L-'~ f' ,""..~-"
-C': '9 5. ;3
-'9 0 4.._--;
-'-~ 37"
-971.2
IIi" -'
-- ,_1,2. · ,"
- 1 0._--:4.6
-1046.7
- I ,'.'174.6
-11 O0.1
-! ! I6..:'
-114i
- I 15 C,.
-1!66.4
- I 12:4.3
-1204.3
-icc ,' .6
- l d':'¢,:
-127.~ ..1
- 1 ._--: 06 · ,--:
-1.q 24.5
2.7
0. '9
1.2
1.9
~; .5
4.0
1 1 .:3
9.0
5.6
4.5
1.1
1.1
.--'.6
8.4
1 ,5
?.6
0,6
0 .
5.9
--
;al , ~
6. ;3
1.0
0.8
!.a
1.1
0.7
1.~
0 :'
6.0
1.4
1.4
3.6
3.3
1.9
3.1
0, ~'~
· 3.3
3..3
.3
3.4
2.0
1.6
1.2
4..3
1.6
4.0
t. :]
0.0
IHT~..rOLRTED i'IEF~SUDED DEPTH FiT 103 FOOT Iit_..~i'IEi'tT.S
~F THE Si.I]B,.]:E~ DEF'TH
SUB.SE~
DEPTH
·
-' I00.
200.
.
400.
---~00.
600.
'_'-. '.:700.
;30 O.
900.
10 0 n.
1 I CiO.
1200.
1 -'no
1400.
" 1500.
1600.
1700.
1 ;3 n q
19 00.
.
z'OA0
2100.
_ _ Q ri
~ ,_ .
2.300.
24 00.
2500.
2600.
2700.
'2;300.
2 9 00.
· ~ ,O 0 FJ.
· 31 00.
· 3200.
· 3 ~ 00.
· 3=~ 0 O.
· 36 0 0.
.37 0 3.
.~ ;:: 0 '.].
.390 0.
4 0 O 0.
41 O0.
42 0 0.
4.30 0.
44 00.
45 g 0.
4 E, 00.
47 0 :).
4'P ;]'. :?.
._,= 00 :).
~ I 0 :).
52 00.
i"iEF~.'~:LIRED S:LIB.S:EFt C:i3BRB I itFtTE '-.:
:DEPTH ,-.," 'l'
216.
316.
416.
516.
616,.
717'.
-817.
917.
1017'.
111,.-'.
12i7.
1.2; 1 ?.
1417.
1517.
1617.
17'17.
1;317 .
1917.
'2017,
2117.
22!7.
· 2317.
2417.
2517.
- ' 26,17.
271 ~--:.
2 ;_--~ 20.
2921.
· 302.--',.
· 3124.
· _-', ~ ~J D.
S 4.30.
.35.34.
.364 0.
E: 74-P..
· 3;35,_--:.
· 3'PE,'3.
4 0;32.
4I 3'3,.
431'3.
444 ',).
4554.
466.3.
4,} 9 >.
.-T,O! P.
5!44.
5272.
54:3 E:.
5524.
- 0.9 4 0.54
- 1 .4 0 1 . 06
-4.0'3 .3.14
-9..3 ,." 5. ?.3
-14.72 ;3.61
-19.51 · 1 0.72
- 2.3.59 i 1 . ;--:2
-27.3;3 12. ;39.
-.30.41 12,. :37
-.32.46, 14..--;.--;
-.34.14 1 =7. ;:_:,3
-.35.17 17 .=70
--35.65 1:3.6 E;
-.2: 5. E: 6 19.52
--, ~ .--, .'-'~
- ._- ...... :,._-, 20..P E:
-36.02 21 .;30
-.;: 6..34 P 2,. 7.:'
-._"', E,. ;-': .3 2 .-_5.62
-.37.15 2 ?. 0.--:
- 3 ?. 19 2 7.6 F-',
-'-' ~':: :';_-". 2'9
~ ,,~', I" ,I ._, ,.,
i._. "-~
-.:', ," . ,-,,- ,'-';:;. 9. 2
- 2: ;--:. C-: ;_:: 2 9.6 6
-4 0. ;39 .':: 0.4 0
-4 7.56, .30.47
-'q 2 6'~ .3 ;] -' -'
- . .-
-;3 0.2 7 .32.91
--96,. :].3 2 L::. 4 2,
-- ! 07.5 .=; 1 ?. ;_--', ',_'l
- 1 12.9. 4 .~. ,-"~
- 11.2',. ;2', 1 - 1.3.64
- 1 ! 2. ;31 -.2', 4.2 ;3
· -1 1 0 ,':,8 -5 ," .~-
- I 0 =;. 9 2 -;2:4 · 97
· -1 :]1 .-TA -120 ..31
-1 O0.12 -16,2 ..39
· -'P ;3. ,32 - 2 07.2 5
-96.66 -254. ;_--:4
- 34.4 7 - .3 ',_'I ~':,. 2 I
-'.-.-' 1 . 6, 9 -.36,.-"~. 16,
-;_--: ;--',. 6, 9- 4 ._--: '::. 9 ;3
· -~3.7,2 - =01 . 05
-106.64 ' - -554.64
- 12.3.4 4 - 6, 05. ;36,
- 14 ! . .=; 2 - q 5 ~'.-~. 6 .-:_';
-16! ..3'4 -7 i.--;. :]1
- I ;:~: =;. :) ! -7 7 ?. 72,
-2 ! 2.1 ;3 -;--;46,. 21
-24 .:;. ;377- -92 0..'31
· -2 ,'.-'6.5 ,] - .~'.:' '::. 2 ~
-.3:]9. i.4 -1 077.09
-.:,~,;] '~,4 i 153 ,.4
~5'4
' ":"66
.: :.:: ':.::,71
" 7..7,
.,
77
78
- 82
B,3
00.
00,
00.
00.
00.
00.
00.
00.
00.
00.
00.
00.
00.
00,
00.
00,
00.
00.
00.
00.
00.
00.
00.
00.
00,
00.
00.
00.
00.
5'503.
6150.
6272.
8524.
6651.
6'P 0.3.
7 02'P.
7!57.
72;34.
7410.
?53,3.
7662:.
779'~ ·
¢:04&.
8167.
8281.
~35 02.
86. 0 P.
~ 029.
91.33.
9237.
9342.
9446.
9551.
- 4 ;.', 5:. ? 4
.... -445
-4;:;.-']. 26
-525
-61 0.65
-654.09
-69?. 56
-74& ..3~
- ? 86. ~.3
°~2 60
-918.6 0
-9 ~ 7.39
-100d
- 10~7 ..33
-1050.I5
-! 070.70
-1089.14
-1106.29
- 1122.0 -'
-1137.50
-I lS3 .~7
-1171.92
-1193.11
- 1217.32
-I244.24
- 12~.3 .~8
- 1304.56
.:,.:,._, . 77
- 1276..
- 13.30. 42
- 1.3:36.9 ;_-3
-14,.;4.26
-15,'IE, :'0
- 1571..::5
- 16.36. '98
- 1700.9'9
- 1762'. 4.3
- 1 ~324 · 42
- 1 ;3 'P 2. ~.:,
- 1962 ..35
-2 0.34.94
-21 09. ;30
-2187.03
-2266.56
-24 {'17 ~':'
-2465.56
-2516.4.3
-2561 .20
-26 O~.
- 2637. ri.::
-2E. 6E: .$4
-2696.24
-2720.54
-274 0.57
-2756.36
-2767. I
-2774. 1 ~:'
-277'~ .25
-27:3.3.6
KO ',"DU 6.~I.'SH TO PR~,E:E.:;-'.2 Fti'~'," i'lOFitE WELL.:: D~.' TD REF'E'DC'E TH I.?. i,.IELL Z, AT~..
LB.:IH,5 Ft Dlhhb~,Ei'iT i'tETHDD DF ,::RL,Z:LILRTIP. i'~, .::T',"F'E ',"E.S DF.: del:' :i"t
--' DFF
~rm ~o. '~--4
1R~"V.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMrr IN I~U!?LICAT'~
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
o,L. o,,e r"q
WELL W~LL oTHER
NAME OF OPIgRATOR
Shell 0~1 Company
ADDRESS OF O~R
1700 Broadway, Denver, Colorado 80290
LOCA~ON OF WELL
Platform A, Leg 2, Conductor 15: 6958'N & 378'W of SE
Corner of Section 14-T8N-R13W, S.M.
API NUAiERICAL CODE
50-133-20305-01
LEASE DESIGNATION AND SE1RIAL NO.
ADL 18756
IF INDIA]~, AIX)T'TEE OR TM1BE N~ME
~ddle Cround Shoal
WE~ NO
A-31-1&
I0 FIFLD ~ND P~L, OH WILDCkT
MGS - "G" Pool
n sec, ~., a, M. mO~O~ .O~
o~~
Section 14-T8N-R13W, S.M.
77-31
13. REPORT TOTAL DEPTH AT END OF MONTH, CHA. NGES IN HOLE SIZE, CASING AND CKMF~NTING JOBS INCLUDING DEPTH
SET ~ VOLU1VIES USED, PEI:13~O~TIONS, TF~STS A_N-D I:LESULTS FISHING JOB~ JU/~K LN HOLE AND SIDE-TRACKED HOLE
AND A2CY OTtIER SIGNIFICA/%IT ~G~S IN HOLID CObrDITIONS
OPERATIONS FOR OCTOBER 1977
1. Ran 3-1/2" tubing w/packer @ 8460
2. Perforated as follows w/4 shots/ft:
Zones Interval Perforated
HR/HZ 9473-9534
9408-9459
HN/HR 9260-9279
9335-9354
~/HN 9104-9121
9180-9246
,,
Tested as follows:
Test No. Zones Tested
1 HR/HZ
2 HR/HZ
HN/HR
B/D Gross Water Cut Gas Inj Gas Prod
264 0.2% 923 MCF/D 77 MCF/D
1488 5.5% 912 MCF/D 578 MCF/D
HR/HZ
HN/HR
I-]K/HN
1640 3.4% 956 MCF/D 664 MCF/D
4. Well completed 10/11/77
5. 24-hr well test (10/13/77):
1793 BO, 27 BW, 858 MCF, 100# TP, 800# CP, GOR 479,
Oil Gravity 35.9 @ 60 deg F, Gas lifted w/1417 MCF
SmNZD T~TL~ Div. Opers. Eng. r. man
NOTE--I~el)ort on this form is r uired for each calendar montl~ regardless of m, status of operations, o.d ~st~ fi~ed]" dUplicate oil and gas conservation commi.ee by the 15~ of the succ~ding mon~, uflle~ otherwise directed.
lr~rm No, P---4
R,~v'*.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
SUBMIT IN DUP. 1,ICATE
1.
O,L G,. []
WELL WELL OTHEI~
NAME OF OPERATOR
SHELL 0IL COMPANY
~bDRESS OF OPEP. ATOR
1700 Broadway, Denver, Colorado
80290
4. LOCA~ON OF WELL
Platform A, Leg 2, Conductor 15: 6958'N & 378'W
of SE Corner of Sec 14, T8N, R13W, S.M.
AP1 N~iE~CAL CODE
50-133-20305-01
LEASE DESIGI~A'I'ION AND SE1RIAL NO.
ADL 18756
IF INDIAkT, AL,O'i 1~;~; OR TRIBE NAME
8. L~NIT FARA~ OIq LEASE
Middle Ground Shoal
9 WELL NO
A-31-14
10 FIELD f~.ND POOL. OR %VILDCAT
MGS - "G" Pool
11 SEC , T., R., M. (BOT'TOM HoL,E
OBJECr~
Sec 14, T8N, R13W, S.M.
1~-. PER.MIT NO
77-31
13. RE~ORT TOTAL DEPTlq AT END OF MONT!q. CI-IA.NGF-,S IN HOLE SIZE, CASING A1N-D Cw.?VIF_.HT!NG JOBS INCLUDING DEPTH
SET A/%TD VOLU1VIES USED. PEi:LFORATIONS, 'r'ESTS AH'D lq.ESULTS FISHING JOB~ JL??IK LN HOLE AND SIDE-TI~.ACKED HOLE
A3qD A_NY OTHER SIGNIFICAHT CTIiA~G~ IN HOLI~ CONDITIONS.
OPERATIONS FOR SEPTEMBER, 1977
1. Set 7-5/8" casing @ 8745' and cemented with 505 sx Class "G"
2. Drilled 6-1/2" hole below casing
3. Fished bit and stabilizer @ 9264' - recovered entire fish
4. Drilled to 9655' (Total Depth)
5. Logged well - DIL/LLS/GR/SP, BHC - Sonic/GR/SP/Cal, CNL/FDC/GR/Cal
6. Hung 5-1/2" liner from 8485' to 9646'. Cemented thru 10 perforations at 9554'-9557'
with 200 sx Class "G" cement (left 200'+- above perfs inside liner.)
7. Cleaned out liner to 9602'.
8. Ran CBL and set tie-back seal assembly.
9. Set retainer @ 9547'
Depth - 9/30/77: 9655' (TD)
9547' (PBTD)
..
-.ii
i~- ~- -,~ .....
oil and gas conlervat;on commiffee by the 15~ of the suoc~ding mon~, u~le~ Otherwise directed.
Conservation
April 5, 1978
Re: Shell Oil Company
~S A3t-i4
Mr. R. Planty
Shell Oil Company
1700 Broadway
~nver, Colorado 80202
Dear ~.~r. Planty:
A per~.lit for the ~bject well was approved on June 2, 1977 and
the follo~in~ o~ration ln~or~.~atl ~ has been received:
(!)
A Monthly Report of Drillin~ and Workover Operations
dated July 15, 1977 and received July 20, 1977 con-
c ~inG the operations for the month of June, 1977.
(2)
A Monthly Report of Drilling and Workover Operations
dated August 15, 1977 and received ~August 19, 1977
concerning the operations for the ~onth of July, 1977.
(3)
A ~onthly Report of Drilling and Workover Operations
date~ September 29, 1977 and received October 5, 1977
which we presume covers the operations for the month
of August~ 1977 since there are no dates in the report.
The foll~ing production information has been received:
October, 1977
November, 1977
December, I977
January, 1978
February, 1978
35~776
47,892
47,275
42,906
37~276
Barrels Oil
Barrels Oil
Barreis Oil
Barrels Oi 1
Barrels Oil
A cor0~erciaI r~port on oil and gas activities that is printed
locally indicates ~hat the subject well was completed on
October t3~ 1977. If this information is correct, and the pro-
~u~tion ~n~o~a~.lon substantiates the a~proxi~ate date, Shell
Oil Cc~any is in violation of the Oil and Gas Regulations of
Mr. R. Pianty
Shell Oil Company
April 5, 1978
the State of Alaska. The violations are listed as follows:
(1) A Monthly Re~rt of Drilling and Workover Operations
for the month of SeptemJ~er, 1977 was required by
October 15, 1977 -- 5__~[~pnths ~nd 21 d.ays late.
(2)
A Monthly Report of Drilling and Workover Operations
for the m<)nth of October, 1977 was required by
November 15, 1977 -- 4 months and 24 da_ys late.
(3)
(4)
A Well Completion or Reco}nDletion Report and Log was
~' ~ 1977 4 months and
required by ~ove~:~ber 12~
..2. 4~..a~ys
.All logs run on the well, deviation surveys and other
pertinent info~ation~ was required, by November 12,
].977 -- 4 months and 24~'s late.
We have previously requ~sted this information by telephone with
O ..... lC~ -
your local fg' but with no results as of this date We request
that ~he ln~o~atlo and data on this well be for~arde¢~ i~m. ediately
Very truly yo~r~ ~
O K Gi ~ Jr.
Director
S H ELL OIL COMPANY
1700 B ROADWAY
DENVER, COLORADO 80202
September 29, 1977
Subject: Shell-ARCO-S tandard
Middle Ground Shoal
A31-14 (AWS-1)
Mr. O. K. Gilbreth, Jr.
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Gilbreth:
Attached are two copies of the Monthly Report of Operations
for September, 1977.
KWL: ts
Yo~s very truly,
R. Planty
Division Operations Engineer
Rocky Mountain Operations Office
Attachments
cc w/Attachs: Atlantic Richfield Company
Standard Oil Company
Amoco
USGS
Form No. P-4
REV. 3-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18756
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Shell Oil Company Middle Ground Shoal
3. ADDRESS OF OPERATOR 9. WELL NO.
1700 Broadway, Denver, Colorado 80290 MGS A31-14 (AWS-1)
4. LOCATION OF WELL
Platform A, Leg 2, Conductor 15,
Corner, Section 14-T8N-R13W, SM
6958' & 378' W of SE
10. FIELD AND POOL, OR WILDCAT
"O" Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Section 14-T8N-R13W - SM
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Drilled to 8745
Attempted to run casing; elevators broke dropping casing.
Fished casing & conditioned and repaired hole (16 days)
Cemented 7-5/8" casing @ 8745
Drilled to 9655 and cemented liner @ 9648
Ran CBL
Milling on retainer
14. I hereby c hat correct
SIGNED. ~ ~ ~ ,,, TITLE Div. Opers. Engr. DATE 9/20/77
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
SHELL OIL COMPANY
1700 B ROADWAY
DENVER, COLORADO 80202
August 15, 1977
Subject:
Shel i-ARCO- Standard
Middle Ground Shoal
A31-14 (AWS-1)
Mr. O. K. Gilbreth, Jr.
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Gilbreth:
Attached are two copies of the Monthly Report of Operations
for August, 1977.
KWL :ts
Yours ver~ truly,
Division Operations Engineer
Rocky Mountain Operations Office
Attachments
cc w/Attachs:
Atlantic Richfield Company
Standard Oil Company
Amoco
USGS
Form No. P-4
REV. 3- 1-70
~,~
SUBMIT IN DUPLICATE
STAT E 0 F A LAS KA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18756
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Shell Oil Company Middle Ground Shoal
3. ADDRESS OF OPERATOR
1700 Broadway, Denver, Colorado 80290
Platform A, Leg 2, Conductor 15,
6958' & 378' W of SE Corner,
Section 14-TSN-R13W, SM
4. LOCATION OF WELL
Surface:
9. WELL NO.
MGS A31-14 (AWS-1)
10. FIELD AND POOL, OR WILDCAT
"G" Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Section 14-T8N-R13W, SM
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Drilled to 9044' and took salt water flow from HE-HF Zone followed by severe loss
circulation. Drill pipe became stuck at 5500'. Spotted 200 sx Class "G" cement
through bit at 8820"; Drill pipe was perforated at 8600' and 1000 sx Class "G"
cement was squeezed through perfs in four separate stages. Drill pipe was backed
off at 5813' following jarring. A 150-sx Class "G" plug was spotted on top of fish
and dressed Off to 5703'. Hole is being side-tracked to the original targets.
Presently drilling at 7089'
14. I hereby and correct
SIGNED TITLE D±V. 0pets. Engr. DATE 8/15/77
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
SHELL Oi L COMPANY
1700 B ROADWAY
DENVER, COLORADO 80~02
July 15, 1977
Subject:
Shell-.ARCO-S tandard
Middle Ground Shoal
A31-14 (AWS-1)
Mr. O. K. Gilbreth, Jr.
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Gilbreth:
Attached are two copies of the Monthly Report of Operations
for July, 1977.
KWL :ts
Attachments
cc W/Attachs:
Yours very truly,
R. Planty ~
Division Operations Engineer
Rocky Mountain Operations Office
Atlantic Richfield Company
Standard Oil Company
Amoco
USGS
Form No. P-4
REV. 3-1-70
SUBMIT IN DUPLICATE
STAT E 0 F A LAS KA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18756
OIL [~ GAS ~-~
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Shell Oil Company Middle Ground Shoal
3. ADDRESS OF OPERATOR 9. WELL NO.
1700 Broadway, Denver, Colorado 80290 MGS A31-14 (AWS-1)
4. LOCATION OF WELL
Surface: Platform A, Leg 2, Conductor 15,
6958' & 378' W of SE Corner,
Section 14-T8N-R13W, SM
10. FIELD AND POOL, OR WILDCAT
"G" Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Section 14-T8N-R13W, SM
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
RU 6/8/77
10-3/4" csg @ 3130'
CO to 3090'
Set cmt plug & WOC 17 hrs
Drilled off @ 2430'
Presently drilling @ 8986'
SIGNED TITLE Div. Opers Engr DATE 7/15/77
· · ....
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be ~iled in duplicate with the
oil and gas conservation committee by the l~ith of the succeeding month,unless otherwise directed.
MGS A-31-14
John Works, Shell Oil, called to report that they keep
losing mud in the hole to the formation. They do not
believe they can lay a cement plug across the perforatiOns~~
as previously planned. I gave him verbal approval to set
a bridge plug in the 7" liner above the perforations and
then lay a cement plug to at least 50' above the liner lap.
I asked that the cement be checked and the top noted in
their report.
June 7, 1977
Hoyle H. Hamilton
June ~., ~77
~ ~ ~ ~. ~31-14
~11 ~1 c~
Pez~it No. 77-31
D.L.~
Division Operations Eng4_neer
P. O. ~ 831
~, ~ 77001
Enct~ is ~he approved app~tion ~ pexmit to drill the above referenced
w~i1 at a locatic~ Un Secti°~ 14, ~skip ~, R~nge i~, S.M.
Well samples, core chips ~ a ~ log are not required. A directic~al
su~. ~ is r~.
Many ri~rs ~ Alas~ ~ their drainage ~ystems have been classified as
~~ ~ ~ subj~ to ~ 16.50.870 ~ t~ re~alaticns ~gated
ther~ (~~ 5, ~ AdmLnistrati~ Code). Prior to ~ing
c~_raticns ~ may be co, reacted by ~ Habitat Coordinator's office, Depart-
m~nt of Fish ~ C~me.
Pollution ~ any Waters of ~ State is ~bite~ by AS 46, Chapter 03,
z~cle 7 ~ ~ r _egula~s '~cmulgated thereun~-r (Title 18, Alaska
~strative ~, ~ '~0) ~ by the Federal ~ter Pollution C~trol
a representative of the Department of Fnv~r~tal Cc~servatic~.
~suant to ~$ 38.40, ~ 'Hire Under State Leases, the Alaska Department
of ~ is ~~ ~~ied of ~he issuance of this rm--'mit to ctrill.
~ ~ us ~ sc~ul~ng~ f~id ~ork, w~ would a~preciate .your not!fyin~, this
office within 48 .ho%=s aftm~c ~ ~11 is ~Sp~ed. We %~ld also like to be
n~Ttifi~ so ~_B~t a representative of tt~ Division may .be present to witness
tes~ing~ of blow-ut prevente~ ~i~nt ~fore ~face casing shoe. is drille~.
D.L.~
~]S A-31-14
-2- June 2, 1977
In ~ e~ant of ~~ ~r ~t please gi~ this office adequate
~ nottficatkn so that we Fay ha~e a witness present.
Alaska Oil and Gas Cc~sezvation Cxmm~ttee
Enclosure
De~t of Fi~ and ~ Habitat Sec+ion w/o encl.
Department of' En~tal ~atic~ w/o encl.
Departmsnt of ~, Superv~, ~ Law O~liance
Division w/o ~1.
SHELL OIL COMPANY
P.O. BOX 831
HOUSTON, TEXAS 77001
May 26, 1977
Subject: Middle Ground Shoal Field
Cook Inlet, Alaska
Platform A, Well A-31-14
NE/4, Sec. 14-8N-13W, SM
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention O. K. Gilbreth, Jr.
Gentlemen'
We should appreciate administrative approval for completion of
subject well in the "G" Pool as an exception to Rule l(b) and pursuant
to Rule 6(d) of Conservation Order No. 44. Wells No. A-32-14 and A-42-
14 are the two permitted "G" Pool producers in the NE/4, Sec. 14-8N-13W,
SM.
Our plan is to deepen idle Well No. AWS-1 which was drilled
and completed during 1967 as a salt water source well but has never been
used for that purpose. Form 10-401 and related data are attached as
required for a re-entry. Also attached is Form 10-403 for abandonment
of the original completion with a diagrammatical prognosis for squeezing
off the salt water beari~ng interval. A plat of the area is an additional
attachment for reference in this connection. Subject well and its
proposed subsurface location are shown together with the other wells and
well tracks in the vicinity.
The proposed well is located in an area of leaseholds owned in
undivided 1/3 interests by Shell, Chevron and Arco. As shown on the
attached plat, the location is approximately 2-1/4 miles from the nearest
common line with another producing lease operated by Amoco.
Justification for this well is based upon the recovery of
additional oil and gas reserves which would not otherwise be produced
within the economic life of the project. The additional drainage point
is designed to achieve a better balance in the operation and enhance
the pressure maintenance program.
STATE OF ALASKA
Your early consideration will be appreciated to enable prompt use of
an available rig.
JES:ja
Yours very truly,
~iv~ioCanr~°rlo~uction ManageTM r
Western Division
Attachments
cc - Atlantic Richfield Co.
P. O. Box 360
Anchorage, Alaska 99510
Chevron USA Inc.
P. O. Box 7-839
Anchorage, Alaska 99510
Amoco Production Company
P. O. Box 779
Anchorage, Alaska 99510
United States Geologic Survey
Department of Oil & Gas
218.E. Street
Anchorage, Alaska 99501
Pom'n 10-- 401
REV. I-I--?!
1~. TYPEOF WOmK
b. TYPgOF W~LL
OIL []
WELL
?(Other- ms,ructions on
STATE OF ALASKA
OIL AND GAS CONSERVATION CO'MMIT~
PERMIT TO DRILL OR D~PEN,:~
DRILL ~ DEEPEN ~
~ate~ souvc6
w,~°'" ~ .o,,,, well ,o,, zo~ .
API No. 50-133-20305-01
6.LEA. SE DESIGNATION ~ S~RIAL NO.
ADL 18756
7. IF INDIAN, A.I.~O'I~VEE OR TRIBE NAIM. E
8. UNIT FARM OR LEASE NAME
2. NAME OF OPERATOR
Shell 0il Company
3. ADDRESS O~ OPERATOR
P. O. Box 831, Houston, Texas
4. LOCATION OF WELL
At surface (** See Below)
77001
Middle Ground Shoal
9. WELL NO.
MGS A-31-14 (*See Below)
10. I~IELD AND POOL, OR WILDCAT
Middle Ground Shoal. "G" Pool
~1. SEC., T., R., M.. (BO"I'rOM
HOLE OBJECTIVE~
Atproposedprod .... e '@ "Gl' Pool Mkr 8700' MD (7866' TVD, 7750'SS)'
4280'N and 1600'W of SE corner of Section 14, T8N, R13W,
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
17 miles NW of Kenai ~ Alaska
14. BOND INFORMATION:
Statewide 0il and Gas TiC 136503
TYPE Surety and/or No.
DISTANCE FROM PROPOSED* : ~..~ , I [) ' 'i
,~. 885-3 (Pro erty) ~. NO. OF AcRE~ IN LEASE,
LOCATION TO NEAREST .--. -
PROPERTY OR LEASE LINE, lm'T. 1000' (Lease) 5120
(Also to neares~ ar(g, umL It ~ y~ '
18. DISTANCE FROM PROPOSED LOCA'FION* ] i~. PROPOSED DEPTH
TO NEAREST WELL DRILLING, COMPLETED.
i
OR APPLIED FOR, FT.
I Il II
600 @ G Pool Mkr. (A-32-14) 9950'
21. ELEVATIONS (Show whether DF, RT, GR, etc.)
116' DF
23. PROPOSED CASING AND CEMENTING PROGRAM
Sec. 14, T8N, R13W, S. M.
~mo,,-, $100,000
17. NO. ACRES ASSIGNED
TO THiS WELL
8O
20. ROTARY OR CABLE TOOLS
Rotary
22. APPROX. DATE WORK WILL START*
Junto. 5, 1977
SIZE OF HOLE SIZE OF CASING WEIGHT PER FO°T GRAI~E SEll'lNG DEPTH q u o n t i ti of c · m e n t
_
,_
1 5II F10 314" 40_.q ,1-55 313r1' *** 2~a ~acks p!,,s 700 sa_ckq dawn
~hnw~ ~nn~mncf n~ll~ u~ 7nn~
, , , ,
...... rr ........ r
,
, , , ,
u~
* Plan to deepen MGS AWS-1 ..(an idle, unused flood water source well).
Surface location' Platform A, Leg 2, Conductor 15s 6958' N and 378' W of SE
corner of Section 14, T8N, R13W, S.M.
Existing casing cemented 3/19/67. Plan to cut window or mill out section of l0 3/4"
and sidetrack new hole for deepening at + 2500'.
IN ABOVE SPAC'~ DI~SCRIBE I~ROPOSED PROGR-adVI: If ~1 ts to dee~n give ~ on present p~u~lve zo~ ~d pro~
~w pr~du~ive ~e. I[ ~ro~l is ~ drill or a~n a~io~lly, give ~rtment ~m' on s~bsu~a~ ~t~ ~d meas~d ~d ~ue
ve~ical dept. Gtv~-bi~{ P~e~e~ter-P~g~am.
24. I hereby certify that the Foregoing Is True an~ Correct
(This space for State office use) CONDITIONS OF APPROVAL, IF AITY. iI
SAMPLES AND CORE CHIPS
[] YES ~ NO
DmECTIO~L SURVEY RE~Um~
~ Y~ a ~o
77-31
PIIRMIT NO.
IMUD LOG
[] YES
[~ NO
June 2, 1977
A.P.I, I~J1VIERICA.L CODN
50-133-20305-01
,,, APPROVAL DA~ ,7]]]f"la 2, 1977
DAT~
AP,~OV~ a~ *See Insm~o., O. Reverse Side
Form 10-403
REV. 1-10q3
Submit "1 ntentions" in Trip,cate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPL. ICATION FOR PERMIT--" for such proposals.)
1. OIL i--'l GAS F--I F~i water source well
WELLI i WELLi I OTHER
5. APl NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18754
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME
Shell Oil Company Middle Ground Shoal
3. ADDRESS OF OPERATOR 9. WELL NO,
P. O. Box 831, Houston, Texas 77001 AWS-1
4. LOCATION OF WELL
At surface 6958' N and 378' W of SE corner of Section 14,
T8N, R13W, S. M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
ll6' DF
CheCk Appropriate Box To Indicate Nature of Notice, Re
14.
10. FIELD AND POOL, OR WILDCAT
Middle Ground Shoal
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec ll, T8N, R13W, S. M.
12. PERMIT NO.
)oft, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR AClDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF [~ REPAIRING WELL
FRACTURE TREATMENT~ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Abandon producing zone of idle water source well employing cement and cement
retainer; plug-back; mill section out of existing cemented 10 3/4 casing;
hole to G Pool zones and total depth of +9950'i and complete as
See attached schematic diagram of well A~S-1 before and after aban-
].6. I hereby certify that the foregoing is true and correct
Chief Petroleum Engr.
CONDIT IONS O~/APPROVAL, I F ~,1~:
TITLE DATE
See Instructions On Reverse Side
i
ii i i iIII Il .......
~ --
~"-~oo
TO i~lt.L UNE
rt"-3ooo
OOUIBLE
IZ- 3000
3000
;;iv; RX 57
TO CHOICE MAPIFOLO
1~'--3000
oouaLE STUDDED A~AI2TER
IO"-5000
m"-~ooo
DRAWN Bi'
_r,~T( §-:~0-75 Rev. 5-ZO-TZ;
SHELL OIL
COMPANY
SCALE NONE.
Z-V- 149
.o --
3000 PSi BLOWOUT PREVENTER STACK
PLATFORM A M.G.S., COOK INLET, STATI~ OF ALASKA
MGS AWS-1
Proposed cementing of existing source water completion interval in well
AWS-1 prior to deepening as A-31-14 to G Pool zones.
Cement to surface
(total 2700 sacks)
Cement "Kick-off"
plug
2631'-3 1/2" Tbg
Mud -~--~ ....
3082'-7" Lnr. Top
3130'-10 3/4" Csg
Cement
Retainer
7" Wire-wrapped
screen liner
gravel -packed
in 18" under-
reamed hole
3607' -Bot. of 18" hole
3620'- TD & 7" lnr. bottom
/,I ~Milled section of
'~', "~3/4" cs9
Side-tracked hol
to G Pool zones
between 8700' anc
9500' (TD +9950'
Cement
BEFORE
(Current)
AFTER
(Proposed)
SCHEMATIC DRAWING
(OPERATOR AMOCO)
:3 w PaPSS,
PDS
18448
ADL 18754
$746AC.
HBP
~5
22
PDS
18449
ADL 18756
5120 AC.
HBP
/t ~
·
\8-?
//
/
/ -
/
/
A-:3-~
/'~'
I
I.....j...~' 9 N--IIIZW
r 8 N-n i2'w
24
,
· I
/ I
'
I
~-.,.~ .~. ~ .... I SAS
~ PaPSS
o~9 (OPERATOR AMOCO)
PDS
20556
ADL 22050
2446 AC.
SHELL OIL WESTERN E 8 P REGION PRODUCTION
comPANy WESTERN D V SION 0EPARTMENT
MIDDLE GROUND SHOAL FIELD
WELL SYMBOLS AT TOP
OF "G" POOL
'T_:. i 'i' i'
SCALE IN FEET
o~,, ,-:7-~, ,~,v,s,o ,,,/7~, iF21 6713
BYOA¢ .
APPROVID
CHECK LIST FOR NEW WELL PERMITS Company ~,~.,, /~
Yes No Remarks
1 Is the permit fee attached ..................... w~]~
Lease & Wel 1 No. '~]'~', ?~-t
2. Is well to be located in a defined pool ............... ~=~,~
3. Is a registered survey plat attached ................
4. Is well located proper distance from property line ........
5. Is well located proper distance from other wells ........
6. Is sufficient undedicated acreage available in this pool ......
7. Is well to be deviated .....................
8. Is ope.rator the only affected pa,rty ...... .........
9. Can permit be approved before ten-day wait ............
lO.' Does operator have a bond in force ................ ,,,,=w~
ll. Is a conservation order needed ...................
t2. Is administrative approval needed ...............
13. Is conductor string provided ..................
Is enough cement used to circulate on conductor and surface .... ~/~j!
14.
15. Will cement tie in surface and intermediate or production strings .
16. Will cement cover all known productive horizons ..........
17. Will surface casing protect fresh water zones ..........
t8. Will all casing give adequate safety in collapse, tension & burst
19. Does BOPE have sufficient pressure rating - Test to ~o~o psig
20. Has DMEM approved Plan of Operation ..............
Additional Requirements'
Approval Recommended'
Geology' Engineering'
TRM /NA ~ HHH JCM ~
HWK/e~C LCS ~, ~. RAD
Revised 11/17/76