Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout192-012Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, June 28, 2010 8:18 AM To: 'Phillips, Ron' Subject: RE: Z-16A report (PTD 192-012) Ron, Thanks for tracking that down. Good work. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Phillips, Ron [mailto:Ron.Phillips@bp.com] Sent: Tuesday, June 22, 2010 9:19 AM To: Schwartz, Guy L (DOA) Subject: RE: Z-16A report (PTD 192-012) ~; .+~,~~~f.~ ~~ `_ er ~ ~~~~ yr: Guy Schwartz, Sorry it took a little time to find the correct person that was on tower 3/28/10. The Nordic 2 tourpusher said, "The problem was a failing 3" shock hose on the kill side. We had found some rubber at the shaker and after inspection of the 3" shock hose, it was determined to be shedding internally. We then rigged down the 3" flexible kill hose and replaced it with 3" hardline with Graylock clamps. At no time have we ever used threaded 1502 type connections in either our choke or kill lines." The Nordic 2 WSL amended the openwells report to reflect that the hardline had graylock connections. If you need more information please call or email. Thanks, Ron Phillips Coil Tubing Drilling Engineer Alaska Drilling & Wells Office (907) 564-5913 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Friday, June 04, 2010 9:35 AM 6/28/2010 Page 2 of 2 To: Phillips, Ron Cc: Regg, James B (DOA) Subject: Z-16A report (PTD 192-012) Ron, As I was reading the drilling report for Z-16 I noticed on 3/28/10 on the initial BOP rigup that the shell test had mentioned a failed PT on the Kill line. It appears that it was replaced with a new section but that also failed. Finally "hardline" was installed and passed a pressure test. This happened before the official witnessed BOP test. Can you elaborate on the type of pipe used ... was it knock-up 1502 type connections? Regulations require the kill line to be rigid pipe without hammer unions (20 AAC 25.285 (e) There is no mention of this in our BOP report submitted by the inspector. Thanks in advance, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (ofFce) 444-3433 (cell) 6/28/2010 PJQ. 5378 Alaska Data. & Consulting Services 2525 Gambell Street, Suite 400 Company: State of Alaska Anchorage, AK 99503-2838 Alaska Oil & GaS Cons Comm ATTtd: Beth Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date AI r..i,,. .~., • 1 C~ Petrotechnical Data Center LR2-1 Alaska Data & Consulting Services 900 E. Benson Blvd. 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 'ja?~ ~~~~~~ ' ~~41~1 ~~ i ~ ~~~i~ ~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, ~ bp ~~~iG~~~GA~ OCT ~ 5 2009 ~IasNc~ ~il F~ Gas Cons. Con~ura~or~ Anch~raq~ ~ a,-- a 12- ~ ~~b Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that coufd result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-O6 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-OSA 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 Z-O9A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009 Z-1o 1891160 50029219860000 NA ].3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 12 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-14B 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 500292197t0000 NA 0.2 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218530000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 02 NA 1.70 7/23/2009 Z-226 1960350 50029220370200 NA 0.5 NA 5.t0 7/23/2009 Z-238 2041080 5~29219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540W0 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2d09 Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-i12 2071720 5002923380000o NA surface NA '~ ~~~~~~~~~~~~ N0. 5310 ~laska Data & ~onsuking Services .y ~~;~ ~~~~~~~~, ~} ~ ;u =:; ;1(~`~ ~ Company: State of Alaska 2525 Gambeu Streec, Suite 400 `~ Alaska Oil & Gas Cons Comm Alnchorage, AK 99503-?_838 Attn: Christine Mahnk~~n F~TTN: Beth 333 West 7th Ave, Suite~ 100 Anchorage, AK 99501 ~1/~11 Job # Log Description Date BL Color CD 07/14/09 ~-20 AP3~-00043 SBHP SURVEY - 06/17/09 1 1 P2-31 AZCM-00029 LDL L~ d 06/17/09 1 1 12-03 AY1M-00022 SBHP SURVEY O6/15/09 1 1 Z-14~ AYQ~-00036 TEMP SURVEY & BHP . O6/23/09 1 1 RI-16 AP3Q-00042 SBHP SURVEY 6 ~ 06/16/09 1 1 V~45 .;,. 11999053 USIT - 10/12/08 1 1 ' N-11C ' AP3Q-00042 SBHP SURVEY 06/16/09 1 1 "` T3=12 AY3J-00030 LDL ~ 06/12/09 1 1 L1-30 AVY5-00049 PRODUCTION PROFILE -nj b~ O6/22/09 1 1 17-078 AY~Q-00031 SBHP SURVEY "~ C5 06/11/09 1 1 OS-258 AP3Q-00040 SBHP SURVEY - 06/11l09 1 1 B-27A AXBD-00028 MEM INJ PROFILE 06/12/09 1 1 11-36 6146-00066 CROSSFLOW & IBP ~- O6/23/09 1 1 Z-21Da 8148-00065 SBHP SURVEY OW21/09 1 1 X-17 AYTU-00043 PROD PROFILE -/ 06/08/09 1 1 ~-25 AWL8-00018 LDL J'~°~ ~'~j - 05/28/09 1 1 02-33B AYTU-00033 USIT ~ ~ 05/19/09 1 1 P2-07 AVY5-00051 PRODUCTION PROFILE ~ J 06/25/09 1 1 13-03 AWLB-00020 LDL 06/01/09 1 1 3-17F/K30 B2NJ-00008 MEM INJ PROFILE (J 06/15/09 1 1 MPS-08 AYS4-00080 LDL O6/15/09 1 1 13-92 AV1H-00019 LDL 07/05/09 1 1 Oi-25 AYTU-00046 USIT - ~~ 06l28/09 1 1 UU-39A AWL8-00023 STATIC TEMP SURVEY ~ ~ 06/26/09 1 1 ~-35 AYTO-00022 SBHP SURVEY - f O6/29/09 1 1 Z-16 AV1H-00017 SBHPSURVEY ~ .. 06/29/09 1 1 18-20 B581•00004 LDL .- ~ ;_ ~ O6/27/09 1 1 Z-29 AVYS-00053 SBHP SURVEY a~ •~ (~(~~~' ~•'" _- ~ 07l03/09 1 1 L5-09 AY~Q-00032 RST ~. (~ O6/13/09 1 1 07-10A BiJJ-00022 MCNL -~ dI 05/26/09 1 '__"_""_"'__~_.........~.. . .~. .....,...........v~.`.~v.u.u~aav~~~vvr~ cr~a.n ~v. BP Expioration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Bivd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 s • ~ • • 7 ~ ~~ -} ~ ~ ,1~. n ALASSA OIL A1~TD GA5 CO1~T5ER'VATIOI~T COl-II~II55IO1~T John McMullen Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 An h ~~L~~ ~CAi~ ~_ ~ ~'~a c orage AK 99519-6612 - ~ 1 ~ `~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-16 Sundry Number: 309-104 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Coxninission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this Zg day of March, 2009 SARAH PAL/N, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Encl. t -- - ~~~~ v' ,~ STATE OF ALASKA ~ ~~~*~3/9 G~ . 1j'~~ ALA OtL AND GAS CONSERVATION COMMISSION ~~ '~~ APPLICATION FOR SUNDRY APPROVA ''I ~'~~~ ~ `~~?~~ ~\~ t5 20 AAC 25.280 lalactra ftil R Cap i:r~n~. Ct3td~l~?1S${I~s~ 1. Type of Request: ®Abandon - ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Exten~O~Ora~e ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - ®Development ^ Exploratory 192-012 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22245-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU Z-16 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028262 &047453- 87.39' - Prudhoe Bay Field / Prudhoe Bay Oil Pool 12• PRESENT WELL CONDITION SUM MARY` Total Depth MD (tt): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11669' - 9214' - 11582' 9143' 11409' None i TV I 1 ~~ 2 9 ' - /4" 2 ' Int i 11 1 7-/" 1 12' 7' 1 Pr Liner -1/ " 107 ' - 11 4' 4 ' - 9 774 Perforation Depth MD (ft): Perforation Depth TVD (tt): Tubing Size: Tubing Grade: Tubing MD (tt): 11256' - 11430' 8876' - 9018' 4-1/2", 12.6# L-80 10738' Packers and SSSV Type: (2) 7-5/8" x 4-1/2" Baker'SAB-3' packers Packers and SSSV MD (ft): 8396' & 10653' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch _ ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: September 1, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 56a-x387 Printed Name Joh Mc ullen Title En ineerin Team Leader Prepared By Neme/Number Signature Phone 564-4711 DatQ, (~ ~ Terris Hubble, 564-4628 ` Commission Use Onl Sundry Number: .! Conditions of approval: Notify Commission so that a representative may witness , a ^ Plug Integrity BOP Test ^ Mechanical Integrity Test ^ Location Clearance ~ other: 3~p~ S ~ 1;-c3.r-~~S°~ ~ c~-~ ~ P S ~ ~oc~+t~~~~-~ ~~ ~.. ~', z- P Subsequent Form R wired: ~---~ APPROVED BY e A roved B . COMMISSIONER THE COMMISSION Dat Form 10-403 Rbv'kr efi 06/20060 ..~ Submit In Duplicate To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Sean Mclaughlin CTD Engineer Date: March, 16, 2009 Re: Z-16 Sundry Approval • by Sundry approval is requested for well Z-16. Z-16 is a conventional waterflood well drilled in 1992. This well has suffered from abnormally low gross fluid rate and low PI even after acidizing and reperforating. This well is no longer competitive for the limited gas lift in the area. After being shut in from 2006 to 2008 it has seen minimal on time recently. REASON FOR SIDETRACK Given the low fluid rates and high water cut Z-16 is a good candidate for a coil sidetrack. The proposed plan for Z-16A is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around October 1, 2009. The existing perforations will be isolated by a cement downsqueeze after setting the whipstock, as well as the primary cement job. The sidetrack, Z- 16A, will exit the existing 5-1/2" liner and kick off in Shublik and drill an S shape well in Zone 4. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. I cv~ ~~., ~ ~,~ ~~goos~ s~~r-wtk ~,- ~'r l ~~ get r~ r ~~ ~`~~ 9~ Pre-Rig Work: (scheduled to begin September 1, 2009) %~ P~ifr.:~,~ "~+~//6"~r ~"'°~ Slav/9' 1. S Dummy WS drift to 11150' ,~rU~ • ~t 2. S Dummy GLV's ~~~d,,«~ 3. O MIT-IA " " ' F f~ 4. E Set 4-1/2 x 5-1/2 TTWS at 11085 te 5. C Mill XN nipple at 10726' with LH motor 6. C Down squeeze cement for P&A - 18 bbls of 15.8 ppg unislurry 7. O AC-LDS; AC-PPPOT-T 8. O PT MV, SV, WV 9. O Bleed gas lift and production flowlines down to zero and blind flange 10. O Remove wellhouse, level pad Rig Work: (scheduled to begin on October 1, 2009) 1. MIRU and test BOPE to 250 nsi low and 3500 ns ~ve7i0r ro'~ Q'~ (/l~rhQ.j~ Fro., Thf ~t~A~ dR ~~C ~~g~g ~~~ v~cj~\1__-- 2. Mi113.8" window at 11,085' and 10' of rathole. Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 470' (28 deg/100 planned) 4. Drill Lateral: 4.125" OH, 750' (12 deg/100 planned) with resistivity 5. Run 3-3/16" L-80 x 2-7/8" chrome liner leaving TOL at 10,680' 6. Pump primary cement leaving TOC at 10800', 18 bbls of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNL/GR/CCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions 0500') 10. Freeze protect well, RDMO Post-Rig Work: • 1. Re-install wellhouse and FL's. 2. Generic GLV's Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra Stewman/Terrie Hubble TREE _ , CNV WELLHEAD = FMC ACTUATOR = BAKER KB. ELEV = 87.04' BF. ELEV = 54.01' KOP = 990' Max Angle = 44 @ 9090' 'Datum MD = 11270' Datum TV D = 8800' SS ~-~ ~ S OTES:5-1/2"CHROME LNR 2105' 4-1/2" OTIS SSSV NIP, ID= 3.813" 10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 2993' Minimum ID = 3.725" @ 10726' 4-1/2" PARKER SWN NIPPLE 1 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10738' TOP OF 5-1/2" LNR 10739' 7-5/8" CSG, 29.7#, ID = 6.875" 11012' PERFORATION SUMMARY REF LOG: CBL ON 03/04/92 ANGLE AT TOP PERF: 35 @ 11256' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 11256 - 11300 O 04/05/92 3-3/8" 6 11320 - 11340 O 05/03/92 3-3/8" 6 11350 - 11390 O 05/03/92 3-3l8" 6 11400 - 11430 O 05/03/92 PBTD ~1 5-1/2" LNR, 17#, 13-CR .0232 bpf, ID = 4.892" GAS LIFT MANDR~S ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3587 2982 41 CAM BK 2 7077 5587 42 CAM BK 1 8361 6750 39 CAM BK 8387' ~ -- ~4-1/2" PARKER SWS NIP, ID = 3.813" 8396' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875" 10621' 4-1/2" PARKER SWS NIP, ID = 3.813" 10632' BAKER PBR RECEPTACLE 10653' 7-518" X 4-1/2" BKR SAB-3 PKR, ID = 3.875" 10726' 4-1/2" PARKER SWN NIP, ID = 3.725" 10738' 4-1/2" WLEG, ID= 3.958" 10724' ELMD TT LOGGED 04/02/92 11409' ~-~ TOP OF SAND DATE REV BY COMMENTS DATE REV BY COMMENTS 03/15/92 SALEH ORDINAL COMPLETION 03/09/01 SIS-QAA CONVERTED TO CANVAS 03/13/01 SIS-MD FINAL 06/19/01 RN/TP CORRECTIONS PRUDHOE BAY UNfT WELL: Z-16 PERMfT No: 1920120 API No: 50-029-22245-00 SEC 19, T11 N, R12E, 982' FNL 8~ 1926' FWL BP Exploration (Alaska) TREE _ PERFORATION SUMMARY REF LOG: CBL ON 03/04/92 ANGLE AT TOP PERF: 35 ~ 11256' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 11256 - 11300 isolated proposed 3-3/8" 6 11320 - 11340 isolated proposed 3-3/8" 6 11350 - 11390 isolated proposed 3-3/8" 6 11400 - 11430 isolated proposed U 5-1/2" LNR, 17#, 13-CR, .0232 bpf, ID = 4.892" ~ ~ 13-3/16 L80 x 2-7/8 Cr X-over 3-3/16" L80 X 2-7/8" Cr cmt'ed and 11085' Mechanical Whipstock 11409' TOP OF SAND DATE REV BY COMMENTS DATE REV BY COMMEMS 03/15/92 SALEH ORIGINAL COMPLETION 03/09/01 SIS-QAA CONVERTEDTOCANVAS 03/13/01 SIS-MD FINAL 06/19/01 RNITP CORRECTIONS 02/04/09 MSE PROPOSED CTD SIDETRACK 12305' PRUDHOE BAY UNIT WELL: Z-16A PERMIT No: API No: 50-029-22245-01 SEC 19, T11 N, R12E, 982' FNL 8 1926' FWL BP Exploration (Alaska) ~~ ~ Z-16A [ Proposed CTD Sidetrack WELLHEAD= FMC ACTUATOR= BAKER KB. ELEV = 87.04' BF. ELEV = 54.01' KOP = 990' Max Angle = 44 @ 9090' Datum MD = 11270' Datum TV D = ~ 8800' SS • 10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 2993' 5-1 /2" CHROME LNR 14-1 /2" OTIS SSSV NIP, ID = 3.813" ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3587 2982 41 CAM BK 2 7077 5587 42 CAM BK 1 8361 6750 39 CAM BK Minimum ID = ' 8387 4-1/2" PARKER SWS NIP, ID = 3.813" 8396' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875" (milled to 3.8") 10621' 4-1/2" PARKER SWS NIP, ID = 3.813" 10632' BAKER PBR RECEPTACLE 10653' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875" TOP OF LNR 10680' 10726' 4-1/2" PARKER SWN NIP, ID= 3.800" ,'milled to 3 8") 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID= 3.958" 10738' 10738' 4-1 /2" WLEG, ID = 3.958" TOP OF 5-1/2" LNR 10739' Top of Cement 10800' 10724' ELMD TT LOGGED 04/02/92 7-5/8" CSG, 29.7#, ID = 6.875" 11012' STATE OF ALASKA ~ 'S~~ ~~' . ALA OIL AND GAS CONSERVATION COMMON ~~~ '~~` REPORT OF SUNDRY WELL OPERATION~~~~~~ ~ ° ~ ~1?,{7c 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ r r ` Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension °" n~ r~ v~?' l ,~~+ J ;~''~y~ Change Approved Program ~ Operat. Shutdown Perforate 0. Re-enter Suspended Wel 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development C~' - Exploratory 192-0120 - 3. Address: P.O. Box 196612 Stratigraphic ~'' ServiCe 6. API Number: Anchorage, AK 99519-6612 50-029-22245-00-00 7. KB Elevation (ft): 9. Well Name and Number: 87.39 KB - PBU Z-16 " 8. Property Designation: 10. Field/Pool(s): ADLO-047453 - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 11669 - feet Plugs (measured) 11409' true vertical 9213.82 ~ feet sur d) None Junk (me a e **~~ jj r g { ~ ~~9ti~ JUL ~ t 2iJ~ Effective Depth measured 11582 feet true vertical 9142.55 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 33 - 113 33 - 113 1490 470 Surface 2961 10-3/4" 45.5# NT-80L 32 - 2993 32 - 2622 5210 2480 Production 10982 7-5/8" 29.7# NT-95 30 - 11012 30 - 8676 8180 5120 Liner 925 5-1/2" 17# 13CR80 10739 - 11664 8455 - 9210 7740 6280 Perforation depth: Measured depth: See Attached - _ _ _ _ True Vertical depth: _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 28 - 10738 0 0 - Packers and SSSV (type and measured depth) 4-1/2" Baker SABL-3 Packer 8396 4-1 /2" Baker SABL-3 Packer 10653 5-1/2" Baker LT Packer 10739 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): l ~iV(~~~ \b.S~ ~t't~~~1CC Treatment descriptions including volumes used and final pressure: ~~' 1~6~ ~`l~ ~'L~-/ ) ,- • 1 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: Shut-in Subsequent to operation: Shut-in 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development Service f~' Daily Report of Well Operations X 16. Well Status after proposed work: OiI Gas WAG ' GINJ WINJ ~'' WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 7/14/2008 Form 10-404 ised 04/200 ~ ~ ~ ~ (~ ~ ~ ~' ~~~ ~ ~ ~~~~ Submit Original Only Z-16 192-0120 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-16 4/5/92 PER 11,254. 11,276. 8,874.21 8,892.2 Z-16 4/5/92 PER 11,276. 11,300. 8,892.2 8,911.82 Z-16 5/2/92 APF 11,320. 11,340. 8,928.17 8,944.52 Z-16 5/2/92 APF 11,350. 11,390. 8,952.69 8,985.4 Z-16 5/2/92 APF 11,400. 11,430. 8,993.58 9,018.13 Z-16 7/3/08 APF 11,350. 11,370. 8,952.69 8,969.05 Z-16 7/3/08 APF 11,370. 11,390. /' 8,969.05 8,985.4 Z-16 7/3/08 APF 11,400. 11,410. / 8,993.58 9,001.76 Z-16 7/4/08 APF 11,260. 11,280. J 8,879.12 8,895.47 Z-16 7/4/08 APF 11,290. 11,300. / 8,903.65 8,911.82 Z-16 7/4/08 APF 11,320. 11,340. 8,928.17 8,944.52 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • Z-16 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 7/2/2008:"*"*WELL SHUT-IN ON ARRIVAL"*** (E-LINE PERFORATING) INITIAL T/IA/OA: 2800/1425/200. RIGGED UP E- LINE. ***JOB CONTINUED ON 3-JULY-2008""* 7/3/2008 *"*JOB CONTINUED FROM 2-JULY-2008"** (E-LINE PERFORATIONS). ALL GUNS ARE 3-3/8" PJ3406 HMX CHARGES, LOADED 6 SPF, 60 DEG PHASING. RUN#1, TAGGED TD AT 11419'. PERFORATED INTERVAL = 11370'-11390'. RUN #2 PERFORATED INTERVAL = 11400'-11410'. RUN #3, TAGGED TD AT 11414', TOOL STUCK AT TD AFTER 3RD TAG OF RUN #3. FLOWED WELL TO FREE TOOL. PERFORATED INTERVAL = 11350'-11370'. BEGIN RIH WITH GUN #4. """JOB CONTINUED ON 4-JULY-2008*** 7/4/2008'*'`*JOB CONTINUED FROM 3-JULY-2008*** :RIH WITH GUN #4, MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG :PHASING, 20 FT LOADED. :PERFORATION INTERVAL= 1 1 320-1 1 340 FT. SURFACE AND VISUAL INDICATION OF FIRE. RIH GUN #5: MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG PHASING, 10 FT LOADED. PERFORATION INTERVAL = 11290 - 11300 FT. SURFACE AND VISUAL INDICATION OF FIRE. RIH GUN #6: MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG :PHASING, 20 FT LOADE PFRFC~RATION INT RVA = 11260 - 11280 FT. SURFACE AND VISUAL INDICATION OF FIRE. :FINAL T/I/O: 2500/1400/200 PSI. WELL LEFT SHUT IN. SSV LEFT :CLOSED PER DSO REQUEST. ***JOB COMPLETED*** FLUIDS PUMPED BBLS 1 diesel 1 Total ) STATE OF ALASKA ) RECEIVE ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 1 5 2,005 REPORT OF SUNDRY WELL OPERATI2a~~i'&GasComt 1. Operations Performed: AnchoraQ.e-, AbandonD Repair WellO Pluç¡ PerforationsD Stimulate D '01:hefU Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time ExtensionD Change Approved Program D Operation Shutdown D Perforate IX] Re-enter Suspended Well 0 2. Operator Name: 3. Address: BP Exploration (Alaska), Inc. 4. Current Well Class: Development Œ] ExploratoryD 5. Permit to Drill Number: 192-0120 6. API Number 50-029-22245-00-00 P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 87.39 8. Property Designation: ADL-047453 11. Present Well Condition Summary: Stratigraphic 0 ServiceD 9. Well Name and Number: Z-16 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Total Depth measured 11669 feet true vertical 9213.8 feet Effective Depth measured 11582 feet true vertical 9142.6 feet Plugs (measured) Top of Sand Plug @ 11425 (04-26-2005) Junk (measured) Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 33 113 33.0 113.0 1490 470 LINER 925 5-1/2" 17# 13Cr80 10739 - 11664 8454.6 - 9209.7 7740 6280 PRODUCTION 10982 7 -5/8" 29.7# NT -95 30 - 11012 30.0 - 8676.3 8180 5120 SURFACE 2961 10-3/4" 45.5# NT-80Ll 32 - 2993 32.0 - 2622.5 Perforation depth: SCANNED JUN 2 1 2005 Measured depth: 11256-11300,11320-11340,11350-11390,11400-11430 True vertical depth: 8876-8912,8928-8945,8953-8985,8994-9018 Tubinç¡ ( size, ç¡rade, and measured depth): 4-1/2" 12.6# L-80 @ 28 10738 Packers & SSSV (type & measured depth): 5-1/2" Baker L T Packer 4-1/2" Baker SABL-3 Packer 4-1/2" Baker SABL-3 Packer Baker PBR Receptacle 4-1/2" Otis SSV Nipple @ 10739 @ 8396 @ 10653 @ 10632 @ 2105 RBDMS 8Fl JUN 202005 12. Stimulation or cement squeeze summary: Intervals treated (measured): 11256-11430 Treatment descriptions including volumes used and final pressure: 534 bbls 3% NH4CI, 142 bbls 90:10 DAD, 132 bbls Mud Acid @ 3700 psi CTU Pressure Prior to well operation: Subsequent to operation: Oil-Bbl SHUT-IN 91 Representative Daily Averaqe Production or Injection Data Gas-Met Water-Bbl Casing Pressure o 875 366 0 Tubing Pressure o 273 13 Copies of Logs and Surveys run _ Daily Report of Well Operations _ ! 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: Oil[!] GasD Development ŒJ Service D 14. Attachments: Contact DeWayne Schnorr Printed Name DeWayne Schnorr A:4·/ÆJ~ WAG D GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174 Sundry Number or N/A if C.O. Exempt: N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Petroleum Engineer Signature Phone 564-5174 Date 6/14/05 Form 10-404 Revised 4/2004 (~\ ,.J " f ~ 1\ ~ .-.~: Ii ù .. ¿.-...., ) ) Z-16 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 04/28/05 MUD ACID TREATMENT/CTU # 9. INITIAL INJECTIVITY WAS 4.5 BBUMIN @ 2020 PSI AFTER FLUID PACK. TAG TD @ 11420' CTM. PUMP MUD ACID PER PROGRAM. SAW A SMALL INCREASE IN WHP DURING FIRST DIVERSION STAGE.. . JOB IN PROGRESS 04/29/05 MUD ACID TREATMENT/CTU # 9. INITIAL INJECTIVITY WAS 4.5 BBUMIN @ 2020 PSI AFTER FLUID PACK. TAG TD @ 11420' CTM.~ PUMP MUD ACID PER PROGRAM. SAW DIVERSION IN ALL THREE STAGES. FINAL INJECTIVITY WAS 3.4 BPM @ 1625 PSI WHP. LEAVE WELL SHUT IN. RDMO. TURN WELL OVER TO ASRC TO FLOW BACK. NOTIFY PAD OP OF STATUS.. . ***JOB COMPLETE*** 05/02/05 6 HOUR TEST. CORRECTED GROSS FLUID RATE 417.5 STBFPD. CORRECTED OIL RATE 36.3 STBFPD. CORRECTED FORMATION GAS RATE 0.052 MMSCFPD. NET WATER RATE 381.2 BWPD. LIFT GAS RATE 1.8 MMSCFPD. WHP 292 PSI. CHOKE 176 BEANS. AVERAGE W/C 91.9%. FLUIDS PUMPED BBLS 82 60/40 Methanol Water 534 3% NH4CI 142 90: 10 DAD Acid 132 Mud Acid 890 TOTAL Page 1 ) TREE = CIW WELLHEAD = Hie ÄcfÜÄTÖR; ",^,w,,,,,,,,,wB'Ã'Rffi' KB.ELEV = 87.04' .. ...." ................. BF. ELEV = 54.01' 'KöÞ';;';' ... ...... ......", '''''99ä ,,~~~~.~Ie,,~ . ,~~~~~q' Datum MD = 11270' DatumTVO = 8800' SS 10-3/4" CSG, 45.5#, L-80, 0 = 9.953" 1-1 2993' r-J Minimum ID = 3.725" @ 10726' 4-1/2" PARKER SWN NIPPLE 14-1/2" 1BG, 12.6#, L-80, .0152 bpf, 0 =3.958" 1-1 10738' 1 TOP OF 5-1/2" LNR 1-1 10739' 7-5/8" CSG, 29.7#, ID = 6.875" 1-1 11012' PERFORA llON SUMrv\A.RY REF LOO: ŒL ON 03/04/92 ANGLEA TTOP PffiF: 35 @ 11256' I\bte: Refer to R'oductbn œ for historical perf data SIZE SA= NTffiVAL Opn/Sqz DATE 3-3/8" 6 11256 - 11300 0 04/05/92 3-3/8" 6 11320-11340 0 05/03/92 3-3/8" 6 11350-11390 0 05/03/92 3-3/8" 6 11400 - 11430 0 05/03/92 1 PBTO H 11582' 15-1/2" LNR, 17#, 13-CR, .0232 bpf, 0 =4,892" H 11664' DATE 03/15/92 03/09/01 03/13/01 06/19/01 REV BY COMtv'ENTS SA LEH ORIGINAL COMR.ETlON SIS-QAA CONVERTED TO CANVAS SIS-MO FNA L RNfTP CORRECTIONS DATE Z-16 e L i t g Z j l I: I J---A ~ ~ REV BY ) SAFETY NOTES: 5-1/2" CHROME LNR 2105' 1-14-1/2" OllS SSSV NIP, 0 = 3.813" 1 ~ GAS LFT rv\A.NDRELS ST tv[) TVO DEV TYPE VLV LATCH PORT DA. TE 3 3587 2982 41 C'AM BK 2 7077 5587 42 C'A M BK 1 8361 6750 39 C'AM BK 8387' 1-14-1/2" PARKERSWS NIP, 10=3.813" 1 8396' 1-17-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3,875" 10621' 1-I4-1/2"PARKERSWSNIP,10=3.813" 1 10632' 1-1 BAKER ÆIR REeEPfACLE 1 10653' 1-17-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875" 10726' H4-1/2" PARKERSWN NIP, ID = 3.725" 1 10738' IJ4-1/2" WLEG, ID= 3.958" 1 10724' 1-1 ELIv1D TT LOGGED 04/02/921 ~ 1 11409' 1-1 TOP OF SAND II 00 rvTv1 ENTS PRUDHOE BAY UNIT WELL: Z-16 ÆRMrT No: 1920120 API No: 50-029-22245-00 SEe 19, T11 N, R12E, 982' FNL & 1926' FWL BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU: Tom Maunder, P. I. Supervisor DATE: April 21, 2001 FROM: Lou Gdmaldi, SUBJECT: Petroleum Inspector SVS Tests BPX Z-pad Prudhoe Bay Field Saturday, April 21, 2001; I witnessed the three-month SVS retests on BPX Z pad in the Westem Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (one SSV Failure) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. This was the first experience I have had with the new SV control system on Z pad and found it to operate quite well. The temperatures today were somewhat mild (+15) and it remains. . to be ~seen how.. they will hold up dudng next winter's cold season. Wells Z-5 and Z-8 had slow clOsing SSV's (+ 2 minutes), Merv called the Automation crew and these were being worked on before I left the pad. The pad is being used as a staging area for some pipeline fabrication and has some equipment and material stored on it. This was kept for the most part neat and orderly. SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay Field. 20 wells, 40 components, One'failure, 2~4% 34 Wellhouse inspections, no problems. Attachments: SVS PBU Z pad 4-21-01 LG.XLS NON-CONFIDENTIAL SVS PBU Z pad 4-21-01 LG Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Lidde~l~w' AOGCC Rep: Lou Grimaldi Submitted By: Lou G. Date: FieldFUnit~ad: .Prudhoe Bay Field, Z PM Separator psi: LPS 159 HPS 21,Apr , i i i . i j I~!! . i i t i .L i .i: ~ r i ! [ '. ' , ! . : ii i Well Permit Separ Set L/P Test Test Test Date Oil, WAG, Gl]NJ, Number Number PSI PSI ,TdP Code Code Code Passed GAS or CYCLE Z-02A 1960430 Z-0~ 1971~i0' 1'59 '125' ' 115 ' P z-on la'9~:~o . z-o~ ~0o7~o' .... ~ '~:~ ~ Z-06 1880320 159 125 125 P P Z-07A 1931100i Z~0sA ~9~':~0' 'i~...... i:~ ~:0 _ iZ-09 1890850! . Z-10 1891160 Z-12 1891020 Z-~nA ~S0~0 k.~ ....~a~oa~0 Z-17 1891390 159 125 125 P P Z-18 1890960 Z-19 1920230 Z-20 1881000 z-:~A ~04~o ~ ~:~ ~:~ ~ P . . Z-25 1881590 159 125 125 P P Z-26' 1890520 .... 159 125 125' P' P " Z-27 1900310 '159 12~i 125 ~ P , .... , ,,,, Z-28' 1881270i Z-29 '' 1890656! "159 i5~ 120 'P P .... Z'30 ' i'900230 .... 159 i251 12o ? P ' " Z-31 188ii20 .......................... 'Z-3'2B "1'97o34o 1'59 125' 125 P "-P .... · . ,, , , , ,, ,i ,, , , , z-33^ ~89ooso z-35 i98o93o ....... Z-38 1980600 159 125 120 P P , . , , RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~_~ ~_G Well ! Permit Number Number Wells: 20 PSI PSI Trip Code I C°del Code I Passed Components: 40 Failures: 1 Failure Rate: Oil, WAG, GIN J, I GAS or CYCLE 2.50% []] 9o Day Remarks: Z75 & 8 ,Long el°sure timeS on sSV. , ............. RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG MEMORANDUM State of Alaska Alas'ka Oil and Gas Conservation Commission TO: Julie Heusser r~,'~ ~'~' Commissioner DATE: January 23, 2001 THRU: FROM: Tom Maunder, ~.~._~~ P. I. Supervisor Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Z Pad Friday, JanUary 19,.2001' I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system'testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOGCC Safety_ Val.~e System Test Report indicates I witnessed the testing of 21 wells and 43 components with 6 failures. The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.). The SSV on well Z~18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired except the slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenance crew to perform the work. Wellhouse inspections were conducted on the 21 wells tested with no exceptions noted. Summary: I witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13,9% failure rate. 21 wellhouse inspections conducted. .A.ttac. hme,nt: SVS PBU Z Pad 1-19-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: .Merv Lidde. low AOCff2C Rep: ' 'jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBUf-Z Pad Separator psi: LPS 159 Date: 1/19/01 ' ' " ' ....... ' ' .... .I I. I I I ............ -_':.:. '.-:..':~-.' ' :.. :.s.. -' . .... Well Pemit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed ~AS or CYCI~ ] i i i ii i i ii i ii Z-01 1880~60 159 125' 125 P P OIL Z-02A 1960430 Z-03' " 1971310 "159 i25''I ' "0" I P' ' ' ' OIL Z-04 1891230 ................. Z-05 ' "1'900780 "'159 .... 125! 120 V P ' OIL Z-06 1880320 Z'-0VA '1'951100 ................... Z'08A i931280 159 "125~" 0 2 ' '43' ' ' 1/22/bl ' OIL Z-09 1890850 Z-10 1891160 ~ ..... Z-11 1'900720! 159 ' i'25: '125 ' 'P P Z , ...... . ..... , , , , , , -12 1891020! Z-13 1~00940 ' 159 .... 1'25 " 155 'P P ....... 0IL Z-14A 1980510: Z15 ' ' '1880880~ ................ z-16 1920120 ~159 1'25 125 " P 'P ......... OIL Z-17 1891'390 159 ...... i25 125 'P ..... P .......... OIL Z-18 '1896960 159 125 '1:/0 P 43 ' ' OIL Z-19 192023O Z-20 '1881000 Z'-21 ','.'189042,0t ............. Z-22B 1960350 159 125 .125 P 4 OIL Z-23A 1950430 Z'-24' 1896180 · 159 i25: 130 P 4 ...... Z-25 1881590 159 .... 12'5 13-5'' P ' P .............. OIL Z-26 '1890520 159 1~1 ,, 125 V P" OIL Z-27 ' 1900310 159 125 125 "P 13 ......... OIL Z-28 1881270 Z-29 1891650 .... 159~ 125 120 P P ..... OIL Z-30 1900230r '159 '12~" 1'15 'P P ............. 0iL z-31 1881120 Z-32B 1970340 159 ''' i25 "125: .... V'- 'P OIL Z-33A 1890050 2750 2660 2500 P P ' 'P GINJ . Z-35 " ' '198'69~0 159 12~ .... 120 ' P' P OIL 1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls Well Permit Separ Set L/P Test Test Test Date ~l, WAC, cmJ, . Number. Number PSI_ PSI Trip Code Code Code Passed GAS,,orCY,C,,LE Z-38 1980600 159 125 120 .P P OIL }Yells: ...... 2,1, Components: 43 Failures: 6 Failure Rate: 13.9%1~i~o my Remarks: Z-08A SSV ~fojl_ ed:_!2 ,minute,.c!o. se:,,,Z,-!,8 ~S...v, failed: 15,,minute cio,se, frgz,,e,n, pil~,,t _ _thawed & passed rete, s[,., ............ _ . . _ 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls THE MATER/AL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 13, 2000 P M E E L E W A T E R IA L U N D ER TH IS M A R K ER C:LORI~MFILM.~ STATE OF ALASKA AD ..... ,A OIL AND GAS CONSERVATION COMMIS, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 982' SNL, 1926' EWL, SEC. 19, T11N, R12E At top of productive interval 2113' SNL, 2163' WEL, SEC. 30, T11N, R12E At effective depth 2302' SNL, 1868' WEL, SEC. 30, T11N, R12E At total depth 2353' SNL, 1881' WEL, SEC. 30, T11N, R12E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=87.39' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number z-16(32-3o. 11-12) 9. Permit number/approval number 92-12 / '10. APl number 50- 029-22245 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11669 feet Plugs (measured) 9214 feet 11582 feet Junk (measured) 9173 feet Casing Length Structural -- Conductor 110 Surface 2960 Intermediate 10979 Production -- Liner 905 Perforation depth: measured Size Cemented Measured depth 20 143 10 3/4 2300 cuft Class G 2993 75/8 1760 cu ft Class G 11012 5 1/2 202 cu ft C/ass G 10757-11662 8450'-8456',8550'-8556', 11254'-11276', 11276'-11300' true vertical subsea6699'-6704',6776'-6781',8852'-8861',8861'-8912' Tubing (size, grade, and measured depth) 4 1/2" @ 10738' Packers and SSSV (type and measured depth) Packer @8396' & SSSV @2105 True vertical depth BKB 143 2622 8675 8468-9207 AUG 1995 .Oil & Gas Cons. Commission , 't~,nchorage 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oit-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 433 2106 10 0 726 3130 324 0 260 284 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the fo~g~~~orrect to the best of my knowledge.~-'-~~ Form 10-40'4 Rev 06/15/88 Date ~/~ ~'~" SUBMIT IN DOPL~ATE 9/13/94 10/06/94 WELL Z-16(32-30-11-12) Stimulation Operation A HCL Treatment was performed to remove scale using the following fluids: OPERATIONS SUMMARY Run in hole with tubing end locator and 2.5" combo nozzle. Locate tubing tail. Run in and tag fill @ 11411. Wash54 4 ft of hard fill (1.5 hour), then could not make more progress. Pumped 5 bbl 15% acid and broke though. Cleaned out fill to 11460 with biozan & sea wtr with gas lift. Noticed tight spot @ 11418 that wasn't jetting away. Jetted perfs with 19 bbl 15% HCL. Let acid soak. Concentrated jetting on lower set of perfs where tight spot was. Let acid soak for 30 min. Tight spot gradually disappeared so it must have been scale buildup in casing. Flushed biozan, solids, and acid out of hole with filtered sea wtr while tripping out. Picked up additional riser and Baker SST tool string.pressure test all eqpt. 4000 psi pump 100bbl filtered sea water dn. tbg. (well dead.) Test set SST above perfs & worked spotting valve. Tried to reset SST @ 1st set point-would not inflate. Picked up to tail pipe to wratchet FCV. Ran back in. Still could not set. Ran back to tail and wratchted again and successfully set SST below tail. Ran back to Set #1 and set SST. Inj into formation @ .3 bpm 3000 psi. Opened spotting valve and spotted fluids to SST. Closed spotting valve and pumped acid as per program max rate was 0.70 BPM at 3190 psi. Moved up the hole to 11,398 and set packer. Spotted fluids and commenced injection. Injection rste was brought up to 1.0 BPM. After 27 bbls of acid out, the pressure dropped on the packer side and increased on the annulus. Unable to release packer. Sheared disc at 5,000 psi and POOH. ALL OF THE TOOL STRING BELOW THE EMERGENCY DISCONNECT LEFT IN HOLE W/3" GS LOOKING UP (SEE B.H.A. FOR DETAILS. RIG DOWN COIL UNIT. NOTE ( TOP OF FISH @ 11,385' ) FLUIDS PUMPED 793 Sea Water 35 Biozan 24 15% HCL w/additves A bullhead Scale Inhibitor was performed using the following fluids: OPERATIONS SUMMARY Pumped BH Scale inhibitor job per program. WHP increased significantly when liquids reached the perforations. Maintained 1830 psi WHP while pumping 4.9 bpm. 100 Bbl. 25 Bbl. 70 Bbl. 65 Bbl. 175 Bbl. 435 Bbl FLUIDS PUMPED Seawater pre-flush w/GS-6 and NE-41 Seawater spacer w/GS-6 and NE-41 Seawater w/10% ESL and activator Seawater overflush w/GS-6 and NE-41 Seawater displacement to the perforations Total Volume. All fluids filtered to 3 microns A~ TRANSMITTAL AND ACKNOWLEDGEMENT OF RECEIPT TO: AOGC ANCHORAGE, AK MA TERIALS RECEIVED VIA:: CORE LAB PERSONNEL ITEMS RECEIVED: CHIP SAMPLES FOR THE STATE FROM BEAVER CREEK #9 BOX 1 6376-6404 FT BOX 2 6405-6428 FT' BOX 3 6429-6455 FT Shipped by: PERRY BROWN for CORE LAB Date: 17-May-95 __,1' , ~1! Received by: '~~ ~~~/~ for ~ 4D~_~ Date: . r-/- r .,, r- r~ , R E~ E i V r...IJ Please note that the items listed above are inventoried, shipped and received in good faith, but due to errors, are subject to minor adjustments. In such case both shipper and receiver agree to make a timely and bona fide effort to correct any observed discrepancies.MA Y 1 7' 1995 CORE LASO~TOF~ES ~X~5 SCHOON ST., ^NOHORAGE, ALASKA 99~8 (9071 ~49~1~ Ull & Gas Cons. Commission A~l~orat,?, ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date= 10 August 1994 RE= Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL J-09 ~¥~7~ N-26 (21-7-11-13) ~ ~ °OZ'B-7 DESCRIPTION 1 CCL/TUBCUTR FINAL BL I CCL/TUBCUTR RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PL/SPNR FINAL BL 1 PL/SPNR RF SEPIA B-16 (21-32-11-14) 1 PL/SPNR FINAL BL 1 PL/SPNR RF SEPIA R-21 i PLS STATIC FINAL BL i PLS STATIC RF SEPIA W-25 (14-16-11-12) Z-28 1 PLS BASKET FINAL BL 1 PLS BASKET RF SEPIA i PLS SPNR FINAL BL 1 PLS SPNR RF SEPIA 1 PLS SPNR FINAL BL 1 PLS SPNR RF SEPIA Cont/ Please sign and ~eturn ~.' Petrotechnical Data Cente= BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 99508 Received by Date ECC No. Run # 1 6247.01 Run ~ 1 Run ~ 1 6245.01 Run # 1 Run ~ 1 6233.01 Run ~ i Run ~ I 5784.06 Run $ 1 Run ~ 1 4041.01 Run # 1 Run ~ I 4952.02 Run # 1 Run ~ 1 4323.01 Run $ 1 Run $ 1 6162.02 Run $ 1 Run # 1 5636.04 Run # 1 ?ERMIT )2-012 92-012 )2-012 92-012 )2-012 92-012 )2-012 92-012 )2-012 DATA BHCA/GR CBT CCL (PERF) CNL/GR DIFL/GR GR/CCL/JWL PFC/GR PFC/GR AOGCC Individual Well Geological Materials Inventory T DATA_PLUS L 10900-11628 L 7700-11514 L 11150-11539 L 10900-11604 L 10900-11657 L 8300-11573 L 11160-11498 L 8300-8650 PROD/SPIN/TEMP/ L 11150-11469 92-012 USIT (C&C) 92-012 407 92-012 407 L 7700-11542 1 R COMP DATE: 03/15/92 R COMP DATE: 04/05/92 92-012 DAILY WELL OP 92-012 SURVEY 92-012 SURVEY 92-012 5217 R 02/09/92-03/15/92 R 0-11036, MWD R 0-11669, GCT T 8300-11700, OH~~. Page: Date: RUN ~re dry ditch samples required? yes. And received? Was the well cored? yes~~lysis & description received? ~re well tests required~ ~es..--n~ R¢~~eived? yes~ Nell is in compliance '~ -" .~ 3omments 1 03/31/94 DATE_RECVD 03/24/92 03/24/92 04/24/92 03/24/92 03/24/92 04/15/92 05/14/92 03/24/92 07/14/92 03/24/92 10/07/92 02/11/93 10/07/92 10/07/92 10/07/92 03/21/92 STATE OF ALASKA ~ AL-~ .~ OIL AND GAS CONSERVATION COMMISS REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging__ Perforate X Pull tubing Alter casing __ Repair well Other 2. Name of Operator BP Exploration (Alaska)/nc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 982' SNL, 1926' EWL, SEC. 19, T11N, R12E At top of productive interval 2113' SNL, 2163' WEL, SEC. 30, T11N, R12E At effective depth 2302' SNL, 1868' WEL, SEC. 30, T11N, R12E At total depth 2353' SNL, 1881' WEL, SEC. 30, T11N, R12E 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=87.39' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z- 16(32-30-11-12) 9. Permit number/approval number 92-12 / 10. APl number 50- 029-22245 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2960 Intermediate 10979 Production -- Liner 905 Perforation depth: measured 11669 feet Plugs (measured) 9214 feet 11582 feet Junk (measured) 9173 feet Size Cemented Measured depth 20 143 10 3/4 2300 cu fl Class G 2993 7 5/8 1760 cuft Class G 11012 5 1/2 202 cuft C/ass G 10757-11662 8450'-8456',8550'-8556', 11254'-11276', 11276'-11300' true vertical subsea6699'-6704', 6776'-6781 ',8852'-8861 ',8861 '-8912' Tubing (size, grade, and measured depth) 4 1/2" @ 10738' Packers and SSSV (type and measured depth) Packer @8396' & SSSV @2105 True vertical depth BKB 143 2622 8675 8468-9207 RECEIVED OCT --1 993 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Alaska Oil & 6as Cons, Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 430 2100 0 1020 .. 2080 5052 558 0 Tubing Pressure 283 345 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby (;ertify that the foregoing is true and correct to the best of my knowledge. Si~lned ~A/~,¢1¢.,,~,~ (~q,-~ Title Senior Technical Assistant/ Form 10-404 Rev 06/15/88 / Date ,/d,)/b/'~ ? SUBMIT IN DUP'LI(~AT-E _~-- 5/02/92 f~h 7/19/93 WELL Z-16(32-30-11-12) Add. err The following interval were added using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11320' - 11340' MD 11350' - 11390' MD 11400' - 11430' MD RECEiV[!> 0 O qr' - ',z 1993 Alaska Oil & Gas Ocms. L;oflltnlg$/u; Anchorage ?'"' STATE OF ALASKA ~'~ ALASKA OIL AND GAS CONSERVATION COMM WELL COMPLETION OR RECOMP LETION REPORT AND LOG" 1. Status of Well Classification of Service Well OIL [] GAS ri SUSPENDED [] ABANDONED [] SERVICE [] Revi~;ion #1 2. Name of Operator 7. Permit Number BP Exploration 92-12 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22245 4. Location of well at surface 9. Unit or Lease Name 982 SNL, 1926 EWL, SEC. 19, T11N, R1 ~.~,~... ~::~u4 }: ~ Prudhoe Bay Unit · :' ..... ~'~ ~ V~.I~I~D i 10. Well Number At Top Producing Interval ~ ~;-'.~._~ ~ ~ . , , i~ ~--~ :2, ~ .~,,.L~._~ Z- 16 (32-30-11-12) 2113 SNL, 2163 WEL, SEC. 30, T11N, R12E~.~ . Field/Prudhoe Bay Pool 2353' SNL, 1881' WEL, SEC. 30, T11N, R12E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 87.39' I ADL 47453 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if olfsho re 116. No. of Completions 2/10/92 3/1/92 4/05/92I N/Aeet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey [20. Depth where SSSV set [21. Thickness of Permalrost 11669' MD/9214' TVD 11582' MD/9173' TVD YES ~ NO []! 2105feet MD! 1892' 22. Type Electric or Other Logs Run CBL/USl T/GR/CCL 23. CASING, LINER AND CEMENTING RECOFID SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENT]NG RECORD AMOUNT PULLED 20' Cond. Weld Surface 10-3/4 45.5# J-55 Surface 2993' 13-1/2" 2300 cuft ASIII/460 cu ft fl Class "G" 7-5/8' 29.7# NT95HS Surface 11012 9-7/8 1760 cuft Class G 5-1/2' 17# 13CrNT80 10757 11662 6-3/4 202 cuft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD} PACKER SET (MD) Western Atlas 4-1/2" 10738' 8396' MD TVD 8550'- 8556' 6776'-6781' 4 spf 82150'- 8456' 6699'-6704' 4 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11254'- 11276' 8852'-8861' 6 spf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11276'- 11300' 8861'-8912' 6 spf 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 04-06-92 I Gas lifted producer Date of Test Hours Tested PRODUCTION FOR OIL-BBL ,.~AS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. ECEtVED AJaska 0il & Gas Cons, C0mmissiof~ Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE I.~. ~ 30. GEOLOGIC MARKERS P~HMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 11044' 8616' Shublik 11080' 8645' Zone 4 11251' 8785' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Sig ned T it l e Drilling_ En_oineer Suoervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, ,%ub~e~ibla jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ._~ Form 10-407 Anch0raga STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO~wMISSION ~ WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL IXl GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 92-12 3. Address 8. APl Number P. O. Box 196612, Anchora~le, Alaska 99519-6612 50- 029-22245 4. Location of well at surface ~ ....................... ~ --- 9. Unit or Lease Name 982'SNL, 1926'EWL, SEC. 19, T11N, R12E ~ =~ ~,:~[~t Prudhoe Bay Unit 2113'SNL, 2163'WEI, SEC. 30,At Top Producing Interval T11N, R12E ! ~!F~[r~ ~ ~~ Z-16($2-30-11-12) At Total Depth '~'~'~<~' ..... ~J Prudhoe Bay Field/Prudhoe Bay Pool 2~3'SNL, 1881'WEL, SEC. 30, T11N, R12E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 87.39' ) ADL 47453 12. Date Spudded 13. D~e T.D. Reached 14. Date Comp., Susp. or Aband. m15. Water Depth, if offshore ~16. No. of Completions 2/10/92 3/1/92 3/15/92~ N/Aeet MSL m one m 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey ~20. Depth where SSSV set 21. Thickness of Permafrost 11669'MD/9214'~D 11582'MD/9173'TVD ~ ~ ~ ~~ 2105Feet MD 1892' 22. Type Electric or Other Logs Run CBUUSIT/GR/CCL 23. CASING, LINER AND CEMENTI~ R~ORD SE~ING DEP~ MD CASING SIZE ~. PER ~. G~DE TOP ~OM ~LE SIZE C~I~ R~ORD A~UNT ~LLED 20' Cond. Weld Sudace 10-3/~ 45.5~ J-55 Su~ace 2993' 13-1/2" 2300 cuff ASIII/460 cuff ft C/ass "G" 7-5/8' 29.7~ NT95HS Sudace 11012 9-7/8 1760 cu ~ C/ass G 5-1/2' 17~ 13CrNT80 10757 11662 6-3/4 202 cu ~ C/ass G 24. Pedorations open to Production (MD+TVD of Top and Bottom and 25. ~BINGR~ORD interval, size and number) SIZE DEP~ SET(MD) PACKER SET Western At/as 4 spf 4-1/2" 10738' 8396' 26. ACID, F~C~RE, CEMENT ~UE~, ~C. MD ~D DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL ~ ~50'- 8~6' 6776~6781' ~0t 8~6' 6699~6704' 27. PRODUCTION TEST Date First Production )Method of Operation (Flowing, gas lift, etc.) 04-06-92 I Gas/i~edproducer Date of Test Hours Tested PROD~TIONFOR OIL-BBL GAS-MCF WATER-BBL C~KES~E ~GAS-OIL RATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Briel description ol lithology, porosity, ~ractur~, apparent dips, and pr~ence ct oil, gas or water. Submit ~re chips. RECEIVED OCT 7 Alaska Oil & Gas Cons. Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS h~RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 11044' 8616' Shublik 11080' 8645' Zone 4 11251' 8785' RECEIVED oor- '/' Alaska Oil & Gas Cor~s. Commission Anchorage 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~~ Title WorkovorEno_inoerSuoervisor Date ... ] fJ/~'/~'[' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: Z-16 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50-029-22245 PERMIT: APPROVAL: ACCEPT: 02/10/92 05:02 SPUD: 02/10/92 06:02 RELEASE: 03/15/92 02:03 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NONE 02/09/92 (1) TD: 0' ( 0) MOVING RIG MOVING RIG FROM DS 4-34 TO Z-16 MW: 0.0 VIS: 0 02/10/92 (2) TD: 0'( 0) RIGGING UP/ACCEPT RIG MW: 0.0 VIS: 0 MOVE TO Z-PAD. N/U. ACCEPT RIG 0500 HRS. 2/10/92 02/11/92 (3) TD: 600'( 600) 02/12/92 ( 4) TD: 2000' (1400) KICKING OFF MW: 9.5 VIS:300 DRILL 37' OF ICE AT SURFACE. TAGGED UP AT 113' SPUD WELL & DRILL TO 479'. CIRC. POOH. TIH. DRILLING IN 13-1/2 HOLE DRILLING FROM 600 TO 2000 MW: 9.9 VIS:300 02/13/92 (5) TD: 3005'(1005) 02/14/92 ( 6) TD: 3005' ( 0) 02/15/92 ( 7) TD: 4053'(1048) 02/16/92 (8) TD: 6150' (2097) CMT 10-3/4 CASING MW:10.4 VIS:300 DRILLING TO 3005'. CIRC. SHORT TRIP. CIRC. PUMP PILL. POH. L/D 13-1/2 BHA. R/U 10-3/4 CASING. CIRC. & COND. DRLG FC. MW: 9.1 VIS: 30 PUMP CMT. DISP W/ RIG PUMPS. L/D CMT HD, LAND JT. N/D DIVERTER. INSTALL SPEEDHD. N/U BOPE. TEST BOPE. P/U NEW BHA. RIH W/ NIT #2. TAG FC @ 2914'. CIRC. TEST CSG. DRLG PLUGS, FC. DRILLING AHEAD MW:10.4 VIS: 57 CIRC. DRILLED FROM 3015 - 3490. CIRC. DRILLING FROM 3490 - 3803' CIRC. DRILLED FROM 3803 - 4053'. DRILLING AHEAD IN 9-7/8 HOLE DRILLING FROM 4043 - 6150 MW:10.6 VIS: 51 02/17/92 (9) TD: 7130' ( 980) 02/18/92 (10) TD: 8250' (1120) DRILLING AHED IN 9-7/8 HOLE MW:10.6 VIS: 51 DRILLED FROM 6150 - 6438' CIRC. PUMP PILL. POH. RIH W/BIT #3 TO 3045'. CBU. RIH TO 6395' DRILL TO 6849' CIRC. DRILLED TO 7130' DRILLING IN 9-7/8 HOLE DRILLING FROM 7130 0 8250'. MW:10.6 VIS: 51 REC£J¥ D Alaska Oil & Gas Oons. Anchorage WELL : Z-16 OPERATION: RIG : NABORS 28E PAGE: 2 02/19/92 (11) TD: 8749' ( 499) 02/20/92 (12) TD: 9220' ( 471) 02/21/92 (13) TD: 9827' ( 607) DRILLING TO 8749'. MW:10.6 VIS: 56 DRILLED AND SURVEYED 8250 - 8470'. CBU. POOH. RIH. RIH. CBU. DRILLED TO 8593'. CIRC. DRILLED AND SURVEYED 8593 - 8749'. DRILLING AT 9220' MW:10.6 VIS: 49 DRILLED & SURVEYED 8749 - 9129'. CBU. POOH. DRILLED TO 9220'. DRILLING AT 9827' DRILLED AND SURVEYED 9220 - 9827'. MW:10.6 VIS: 45 02/22/92 (14) TD: 9890' ( 63) 02/23/92 (15) TD:10425' ( 535) 02/24/92 (16) TD:10684' ( 259) 02/25/92 (17) TD:l1036' ( 352) 02/26/92 (18) TD:l1036' ( 0) 02/27/92 (19) TD: 11036' ( 0) 02/28/92 (20) TD: 11120' ( 84) 02/29/92 (21) TD:11259' ( 139) DRILLING AT 9890 MW:10.6 VIS: 45 DRILLED AND SURVEYED 9827 - 9831' CBU. POOH TO 7741' RIH. CIRC. POOH. CIRC. & ROTATE. POOH. TEST BOP. RIH. DRILLED TO 9890'. DRILLING AT 10425' MW:10.7 VIS: 50 DRILLED & SURVEYED TO 10310'. POOH. RIH. DRILLED TO 10425' DRILLING AT 10684' MW:10.7 VIS: 49 DRILLED AND SURVEYED FROM 10425 - 10548'. CBU. PUMP PILL. POH. RIH. REAM TO 10548' DRILLED AND SURVEYED FROM 10548 - 10684'. POOH (SLM) MW:10.7 VIS: 44 DRILLED AND SURVEYED 10684 - 11023'. CBU. DRILLED 11023 - 11036'. CIRC. PUMP PILL. POOH (SLM) CMT 7-5/8" CSG. MW:10.7 VIS: 45 POOH. TEST BOPE. RIH W/ 7-5/8" CSG. LOST MUD RETURN @ 6481' RIH SLOW. M/U CMT HD. TEST CMT LINES. CMT CSG. RIH W/BIT #8 MW:10.3 VIS: 43 INSTALLED & TESTED 7-5/8 PACKOFF. TESTED BOP. L/D 5: DP. P/U 6-3/4 BHA. P/U & RIH W/3-1/2 DP. DRLG. MW: 9.6 VIS: 60 RIH. CIRC. TEST CSG. DRLG PLUGS, FC F/ 10924'-10932' DRLG CMT F/ 10932'- 10995'. CBU. CHANGE OVER TO XCD POLYMER MUD. DRLG CMT, FS, RAT HOLE TO 11036'. DRLG F/ 11036'-11059'. REAM F/ 11040'-11059' CIRC & RAISE MUD WT TO 9.6 PPG. DRLG F/ 11059'-11112' RIH WITH BIT %9 MW: 9.6 VIS: 74 DRILLED TO 11259' PUM PILL. POH & CHANGE BIT. RIH TO 1152'. RIH. .AJaska .Oil .& Gas Cons. Anchorag~ WELL : Z-16 OPERATION: RIG : NABORS 28E PAGE: 3 03/01/92 (22) TD:11669' ( 410) 03/02/92 (23) TD: 11669' ( 0) 03/03/92 (24) TD: 11669' ( 0) 03/04/92 (25) TD:11582' ( 0) 03/05/92 (26) TD:11582 PB:11582 CBU MW: 9.6 VIS: 46 DRILL TO 11574'. PUMP DRY JOGB. POH. RIH W/B IT #10. REAM FROM 11495 - 11574' DRILL TO 11669' (TD) CBU. LOGGING 6-3/4 HOLE MW: 9.6 VIS: 52 SHORT TRIP TO 10984' CIRC. POH. RIH. TAGGEND BOTTOM. WASHED & REAMED. POH. R/U ATLAS. CEMENTING 5-1/2 LINER MW: 9.7 VIS: 59 RIH. CIRC. POH FOR LINER. RIH W/CHROME LINER. CIRCULATE & CONDITION MUD. POH FOR LOGS MW: 8.9 VIS: 0 SET HANGER & PACKER. REVERSE CIRC. POH WET. RIH W/BAH #10. TESTED LINER. POH. L/D DP. R/D CASING CREW POOH. L/D BHA. RUN CBL.USIT/GR/CCL. MW: 8.9 CaBr 03/06/92 (27) TD:11582 PB:11582 POOH TO PERFORATE 7-5/8 CASING MW: 8.9 P/U BHA #1 & 3-1/2 DP. INCREASE MUD TO 10.8+. SQUEEZED. POOH. WESTERN ATLAS PERFORATING. WBM 03/07/92 (28) TD:11582 PB:11582 03/08/92 (29) TD:11582 PB:11582 WOC MW:10.5 WBM PERFORATE 8450 - 8550' TEST BOPS. RIH. SET RET AT 8525. UNSTING & GET SBR STING IN. CIRC. PACKOFF. ATTEMPT TO REV CIRC. UNSTING. PUMP 20 BBLS WATER 100 SX CEMENT, 7 BBLS WATER. SQZ 10 BBLS WATER, 10 BBLS, CEMENT BELOW RET. REST OF CEMENT ABOVE RET. POOH 10 STDS. REV CIRC. POOH. WOC. WOC MW:10.5 WBM P/U. RIH. TAG CEMENT AT 8436'. WOC. CBU. TIH. CBU. TEST LINES. POOH. P/U BIT & BHA & RIH TO 8000'. 03/09/92 (30) TD:11582 PB:11582 03/10/92 (31) TD:11582 PB:11582 WOC MW:10.5 WBM WOC. CIRC & COND MUD. TAG CEMENT AT 8357' TEST CASING. DRILL SOFT CMT 8357-8470. DRILL FIRM CEMENT 8470-8515. CBU. TEST TOP PERFS 8446-8450'. CBU. TEST BOTTOM PERFS. POOH. P/U HOWCO & RIH. WASHED & CIRC. PUMP WATER, SLURRY. POOH. SQUEEZED. NOTE: EFC RAISED DUE TO THREE SQUEEZES IN THE 7-5/8" CSG TO SEAL OFF KUPARUK SANDS. CBU TP TEST BOTTOM SET OF PERS MW:10.5 WOC. POOH. M/U BIT #14 & BHA. TIH. TAG CEMENT AT 8052' CBU. DRILLING HARD CEMENT FROM 8465 - 8560' CBU. WBM WELL : Z-16 OPERATION: RIG : NABORS 28E PAGE: 4 03/11/92 (32) TD:11582 PB:11582 CLEAN OUT 5-1/2 LINER MW:10.5 WBM TESTED LOWER PERFS. CIRC. DRILLED HARD CEMENT FROM 8560 - 8566'. CIRCULATE. POOH. L/D BHA. P/U 2-7/8 DP. RIH. 03/12/92 (33) TD:11582 PB:11582 03/13/92 (34) TD:11582 PB:11582 RIH W/FTA#2 MW:10.5 WBM CIRCULATE. TEST CASING. POOH & L/D 2-7/8 DP. LOST IN HOLE 4-3/4 ECONO MILL, BIT SUB, & 20 3-1/2 DRILL COLLARS. RIH. POOH & L/D FTA#1. R/U FTA#2. RIH. RIH W/PACKER ON DP MW:10.5 WBM RIH W/FTA #2. POOH. L/D FTA #2. RIH TO TOP OF LINER 10740'. CIRCULATE. POOH. L/D BHA RIH 3/3-1/2 DP. 03/14/92 (35) TD:11582 PB:11582 SHEAR RP VALVE MW:10.6 WBM RIH. POOH & L/D 3-1/2 DP. RUN 4-1/2 COMPLETION. TEST ANNULUS. TEST CONTROL LINES. SET PACKER. 03/15/92 (36) TD:11582 PB:11582 RIG RELEASED MW: 8.9 WBM SET BPV. N/D BOP. PULL BPV. TEST TREE. RELEASE RIG 0200 HRS. SIGNATURE: (drilling superintendent) DATE: RECE!VE[ ) ORiGiNAL ?~ ~/~ SUB - S URFA CE DIRECTIONAL F'~ UIDANCE ~'J ONTINUOUS F'~ OOL Company BP EXPLORATION SURVEY MICI OFILMEI Well Name Z-16 (32-30-11-12)(982'FNL,1926'FWL,SEC 19,T11N,R12E) Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference No. Date 92248 02-APR-1992 Loqcled By: Computed By: G. JOHNSON S. DEES SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 02-APR-1992 ENGINEER: G. JOHNSON METHODS OF COMPUTATION TOOL LOCATION: TA~GF_~IAL- Averaged deviation and azimuth INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 10 DEG 13 MIN EAST COMPUTATION DATE: lO-APR-g2 PaGE I BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY- 02-APR-1992 KFILY BUSHING ELEVATION- 87.39 FT ENGINEER' G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 6O0 O0 700 O0 800 O0 900 O0 0 O0 100 O0 200 O0 299 99 399 99 499 97 599 94 699 78 799 23 898 23 -87.39 12 61 112 61 212 60 312 60 412 58 512 55 612 39 711 84 810 84 0 0 N 0 0 E 0 22 N 78 55 E 0 25 N 85 19 E 0 33 S 79 34 E 0 47 S 69 36 E 1 1 S 51 55 E 2 3 S33 11E 4 28 S 20 59 E 7 5 S 1628 E 9 0 S15 7E 0 O0 0 11 0 15 0 33 0 84 1 84 4 05 9 30 19 60 33 61 0 O0 0 22 0 19 0 5O 0 O0 0 28 2 50 2 25 1 54 2 24 0 1 3 7 17 31 0 O0 N 0035 O06N 0 02N 31 S 08 S 03 S 95 S 84 S 39 S 000 E 050E 1 17 E 1 94 E 303 E 437 E 604 E 8 36 E 11 54 E 15.33 E 0 O0 N 0 0 E 0 1 1 3 4 6 11 21 34 5O S 87 4 E 17 N 87 11 E 94 N 89 32 E 04 S 84 10 E 5O S 76 7 E 76 S 63 2O E 53 S 46 27 E 24 S 32 54 E 93 S 26 2 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 996 66 O0 1093 O0 1188 O0 1280 O0 1372 O0 1465 O0 1557 O0 1648 O0 1735 O0 1819 909 27 11 30 81 1006 67 1101 95 1193 89 1285 41 1378 26 1469 33 1560 g9 1648 75 1732 42 15 53 28 21 8 56 23 31 50 22 25 02 22 27 87 23 55 94 25 34 60 31 56 36 33 38 S 12 52 E 51.21 S 9 33 E 74.76 S 10 58 E 106.30 S 13 48 E 144.77 S 14 13 E 184.01 S 12 1E 221.89 S 9 15 E 261.42 S 7 12 E 302.71 S 7 21E 350.62 S 7 37 E 405.18 3 06 4 2O 4 54 0 73 0 35 1 18 1 2O 5 46 4 04 0 66 48 49 S 71 62 S 102 71S 140 28 S 178 44 S 215 37 S 254 24 S 295 14 S 342 78 S 396 93 S 19 65 E 24 29 37 47 55 63 69 74 81 52 32 S 22 4 E 10 E 75 37 E 106 88 E 145 36 E 184 98 E 222 20 E 261 O4 E 303 87 E 350 98 E 405 57 S 18 36 E 83 S 15 57 E 30 S 15 7 E 62 S 14 52 E 53 S 14 34 E 98 S 13 58 E 11 S 13 10 E 86 S 12 19 E 31 S 11 4O E 2000 O0 1902.30 1814.91 36 9 2100 2200 2300 2400 2500 2600 2700 2800 2900 O0 1978.61 1891.22 44 20 O0 2047.34 1959.95 47 20 O0 2115.38 2027.99 46 26 O0 2186.84 2099 45 43 4 O0 2259.79 2172 40 43 16 O0 2332.53 2245 14 43 7 O0 2406.37 2318 98 42 11 O0 2480.41 2393 02 42 18 O0 2554.16 2466 77 42 36 S 7 48 E S 7 21 E S 7 9 E S 7 5 E S 847 E S 12 13 E S 14 17 E S 14 12 E S 13 46 E 1012 S 13 9 E 1080 461.55 525.97 598.49 671 66 741 52 809 91 878 39 945 66 73 15 6 89 9 50 0 66 3 56 1 02 4 84 2 43 0 24 0 59 0 61 452.86 S 516.77 S 98 588.82 S 107 661.55 S 116 730.8O S 125 798.19 S 137 864.82 S 153 930.18 S 170 995.40 S 186 1061.07 S 202 89 51 E 461 62 S 11 11 E 05 E 525 13 E 598 16 E 671 81E 741 42 E 809 83 E 878 43 E 945 71E 1012 43 E 1080 99 S 10 45 E 49 S 10 19 E 67 S 9 58 E 55 S 9 46 E 93 S 9 46 E 39 S 10 5 E 67 S 10 23 E 75 S 10 37 E 21 S 10 48 E 3000 O0 2627.62 2540.23 42 48 3100 3200 3300 3400 3500 3600 3700 3800 3900 O0 2700 72 2613.33 43 5 O0 2773 O0 2847 O0 2922 O0 2998 O0 3073 O0 3149 O0 3225 O0 3300 83 2686.44 42 46 51 2760 12 42 5 50 2835 11 41 10 07 2910 68 40 46 69 2986 30 40 48 57 3062 18 40 28 65 3138 26 40 41 69 3213 30 42 5 S 12 41E 1147 93 S 12 30 E 1216 S 13 31E 1284 S 13 51E 1351 S 13 40 E 1417 S 14 57 E 1483 S 15 40 E 1548 S 15 19 E 1613 S 14 53 E 1677 S 15 17 E 1743 11 26 74 77 11 27 12 79 64 0.58 0.04 1.20 2 26 0 28 1 56 0 99 0 66 0 95 1 06 1127.20 S 217.59 E 1148 O1 S 10 56 E 1193 81 S 232.44 E 1216 1260 1325 1390 1453 1516 1579 1642 1706 32 S 247.62 E 1284 99 S 263.72 E 1351 25 S 279.44 E 1418 76 S 295.37 E 1483 83 S 312.82 E 1548 58 S 330.26 E 1613 26 S 347.10 E 1678 08 S 364.30 E 1744 23 S 11 1E 41 S 11 7 E 96 S 11 15 E 05 S 11 22 E 47 S 11 29 E 75 S 11 39 E 74 S 11 49 E 54 S 11 56 E 54 S 12 3 E COMPUTATION DATE: lO-APR-g2 PAGE 2 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY' 02-APR-1992 KELLY BUSHING ELEVATION' 87.39 FT ENGINEER' G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET 0f MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3374.65 3287 26 42 20 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 3448.61 3361 22 42 19 O0 3522.24 3434 85 42 52 O0 3595.36 3507 97 43 8 O0 3668.28 3580 89 43 13 O0 3741,05 3653 66 43 26 O0 3813.63 3726.24 43 25 O0 3886.58 3799.19 42 46 O0 3960.13 3872.74 42 25 O0 4034.42 3947.03 41 44 S 14 51E 1810 70 S 14 10 E 1877 S 14 9 E 1945 S 13 56 E 2013 S 13 42 E 2081 S 13 32 E 2150 S 13 22 E 2218 S 13 11E 2287 S 13 5 E 2354 S 12 40 E 2421 82 33 40 68 15 84 14 8O 68 0 51 0 36 0 42 0 34 0 26 0 27 0 O8 0 66 0 9O 0 44 1771 05 S 381.87 E 1811 75 S 12 10 E 1836 22 S 398.66 E 1879 1901 83 S 415.20 E 1946 1968 02 S 431.77 E 2014 2034 46 S 448 11E 2083 2101 12 S 464 24 E 2151 2168.04 S 480 23 E 2220 2234.60 S 495 93 E 2288 2300.58 S 511 34 E 2356 2365.84 S 526 24 E 2423 O0 S 12 15 E 63 S 12 19 E 82 S 12 22 E 22 S 12 25 E 80 S 12 28 E 59 S 12 29 E 97 S 12 31E 72 S 12 32 E 66 S 12 32 E 5000 O0 4109 23 4021.84 41 30 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 4184 O0 4258 O0 4333 O0 4408 O0 4483 O0 4558 O0 4633 O0 4708 O0 4783 03 4096 64 41 41 77 4171 75 4246 50 4321 29 4395 11 4470 03 4545 07 4620 03 4695 38 41 27 36 41 31 11 41 38 90 41 34 72 41 31 64 41 21 68 41 28 64 41 16 S 12 21E 2487 98 S 11 49 E 2554 S 11 37 E 2620 S 11 22 E 2686 S 10 55 E 2753 S 10 19 E 2819 S 9 41E 2886 S 10 33 E 2952 S 11 23 E 3018 S 11 21E 3084 31 73 88 30 67 02 25 34 51 O. 21 0.40 0.32 O. 53 0.50 0.56 0.37 1.44 0.35 O. 29 2430.63 S 540 60 E 2490.02 S 12 32 E 2495.52 S 554 2560.58 S 567 2625.43 S 581 2690 59 S 594 2755 83 S 606 2821 17 S 617 2886 43 S 629 2951 28 S 641 3016 16 S 654 49 E 2556.38 S 12 32 E 96 E 2622.82 S 12 30 E 13 E 2688.98 S 12 29 E 02 E 2755.38 S 12 27 E 24 E 2821.72 S 12 24 E 73 E 2888.01 S 12 21E 13 E 2954.19 S 12 18 E 89 E 3020.28 S 12 16 E 96 E 3086.45 S 12 15 E 6000 O0 4858 06 4770 67 41 24 6100 6200 6300 6400 6500 6600 6700 6800 6900 O0 4933 O0 5007 O0 5081 O0 5155 O0 5230 O0 5304 O0 5379 O0 5453 O0 5527 14 4845 55 4920 23 4993 63 5068 33 5142 92 5217 36 5291 68 5366 92 5440 75 41 30 16 42 18 84 42 29 24 41 39 94 41 42 53 41 47 97 41 57 29 42 4 53 42 4 S 12 0 E 3150.61 S 13 16 E 3216.59 S 13 1 E 3283.32 S 13 24 E 3350.84 S 14 47 E 3417.49 S 14 52 E 3483.76 S 14 49 E 3550.15 S 14 53 E 3616.70 S 14 53 E 3683.40 S 14 55 E 3750.16 1 58 1 51 0 98 1 8O 0 42 0 46 0 33 0 14 0 23 0 14 3080 95 S 668 10 E 3152 56 S 12 14 E 3145 3210 3276 3341 3405 3469 3534 3598 3663 36 S 682 44 S 697 28 S 713 05 S 729 32 S 746 70 S 763 24 S 780 91S 798 66 S 815 74 E 3218 87 E 3285 18 E 3353 61E 3419 65 E 3486 70 E 3552 79 E 3619 O0 E 3686 17 E 3753 61 S 12 15 E 41 S 12 16 E O1 S 12 17 E 79 S 12 19 E 21 S 12 22 E 76 S 12 25 E 46 S 12 27 E 32 S 12 3O E 25 S 12 33 E 7000 O0 5602.15 5514.76 42 3 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 5676.49 5589.10 41 53 O0 5750.83 5663.44 42 8 O0 5824 75 5737.36 42 34 O0 5898 56 5811.17 41 48 O0 5973 81 5886.42 41 3 O0 6049 15 5961.76 41 3 O0 6124 44 6037.05 41 17 O0 6199 67 6112.28 40 52 O0 6276 17 6188.78 39 28 S 15 2 E 3816.94 S 13 41 E 3883 63 S 12 52 E 3950 44 S 12 39 E 4017 72 S 11 46 E 4085 14 S 10 47 E 4150 S 10 2 E 4216 S 9 7 E 4282 S 7 45 E 4348 S 7 10 E 4412 99 74 55 40 72 0 18 1 75 0 46 0 53 2 45 0 59 0 62 0.81 1.67 1.44 3728 39 S 832 48 E 3820 20 S 12 35 E 3793 13 S 849 30 E 3887 3858 27 S 864 48 E 3953 3923 96 S 879 34 E 4021 3989 87 S 893 76 E 4088 4054 48 S 906 52 E 4154 4119 13 S 918.45 E 4220 4184 04 S 929.41 E 4286 4249.20 S 939.06 E 4351 4313.05 S 947.43 E 4415 05 S 12 37 E 93 S 12 38 E 28 S 12 38 E 75 S 12 38 E 58 S 12 36 E 29 S 12 34 E 02 S 12 31E 73 S 12 28 E 89 S 12 23 E BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: lO-APR-g2 PAGE 3 DATE OF SURVEY: 02-APR-1992 KELLY BUSHING ELEVATION: 87.39 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN 8000 O0 6353.72 6266 33 39 9 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 6431.42 6344 03 38 43 O0 6509.00 6421 61 39 41 O0 6586 18 6498 79 39 17 O0 6663 85 6576 46 38 18 O0 6742 97 6655 58 37 46 O0 6821 66 6734.27 38 40 O0 6898 09 6810.70 41 31 O0 6972 69 6885.30 41 39 O0 7047 76 6960.37 41 24 9000 O0 7121 62 7034.23 43 29 9100 92O0 9300 9400 9500 9600 9700 9800 9900 O0 7193 O0 7266 O0 7340 O0 7414 O0 7487 O0 7561 O0 7638 O0 7715 O0 7793 75 7106.36 43 34 80 7179.41 42 51 47 7253 08 42 19 38 7326 99 42 19 99 7400 60 42 51 85 7474 46 41 16 33 7550 94 39 41 10 7627 71 40 2 07 7705 68 36 51 10000.00 7873.19 7785 80 37 1 10100.00 7952.76 7865 10200 O0 8031.71 7944 10300 O0 8110.16 8022 10400 O0 8188.25 8100 10500 O0 8266.21 8178 10600 O0 8344.41 8257 10700 O0 8423.75 8336 10800 O0 8502.94 8415 10900 O0 8583.82 8496 37 37 33 32 38 10 77 38 30 86 38 42 82 38 56 02 37 44 36 37 24 55 37 24 43 34 44 11000 O0 8666 42 8579.03 33 56 11100 O0 8748 43 8661.04 35 45 11200 O0 8830 01 8742.62 35 5 11300 O0 8911 86 8824.47 35 11 11400 O0 8993 62 8906.23 35 9 11500 O0 9075 43 8988.04 35 4 11600 O0 9157 33 9069.94 35 1 11669 O0 9213 84 9126.45 35 1 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG MIN FEET S 6 53 E 4475 75 S 6 26 E 4538 S 8 28 E 4601 S 6 47 E 4665 S 4 35 E 4727 S 4 42 E 4788 S 4 37 E 4850 S 6 45 E 4914 S 9 6 E 4980 S 9 41E 5047 S 9 8 E 5114 41 S 7 50 E 5183 S S 59 E 5251 S 8 22 E 5319 S 9 11E 5386 S 8 3 E 5454 S 10 5 E 5521 S 12 7 E 5586 S 11 13 E 5650 S 11 21E 5712 59 59 13 92 73 17 41 94 O0 63 80 28 62 29 65 06 12 69 DEG/IO0 FEET FEET FEET DEG MIN 0 74 0 62 I 11 1 65 2 13 1 28 2 48 2 57 1 65 I 48 2.03 2.23 0.89 2.87 0 88 0 72 4 72 0 72 0 28 2 73 4375 74 S 954 98 E 4478 74 S 12 19 E 4438 4500 4563 4626 4687 4748 4813 4879 4944 25 S 962 81S 970 81S 979 47 S 985 45 S 990 94 S 995 11S 1001 06 S 1010 19 S 1021 41E 4541 5O E 46O4 18 E 4667 50 E 473O 03 E 479O 17 E 4852 32 E 4916 52 E 4982 58 E 5048 39 S 12 14 E 25 S 12 10 E 67 S 12 7 E 26 S 12 2 E 86 S 11 56 E O9 S 11 5O E 16 S 11 45 E 61 S 11 42 E 63 S 11 40 E 5010 70 S 1032 55 E 5115.99 S 11 39 E 5079 5146 5214 5280 5347 5414 5477 5540 5601 17 S 1042 99 S 1051 14 S 1058 63 S 1069 56 S 1079 22 S 1089 33 S 1102 10 S 1115 48 S 1127 95 E 5185.14 S 11 36 E O1E 5253 20 S 11 32 E 83 E 5320 57 S 11 29 E 59 E 5387 86 S 11 27 E 71 E 5455 47 S 11 25 E 66 E 5522 79 S 11 23 E 59 E 5587 20 S 11 23 E 48 E 5651 28 S 11 23 E 71 E 5713 87 S 11 23 E S 10 45 E 5772.52 S 10 45 E 5833.09 S 8 49 E 5894.47 S 6 13 E 5956.40 S 4 4 E 6018.61 S 2 16 E 6080.73 S 3 36 E 6142.51 S 3 8 E 6202.99 S 1 26 E 6263.45 S 4 22 E 6321.73 0 55 0 67 1 79 1 33 1 49 0 74 2 72 2 69 1 15 0 86 5660 23 S 1139 03 E 5773 70 S 11 23 E 5719 5780 5841 5903 5966 6028 6089 6150 6209 73 S 1150 18 S 1160 67 S 1169 87 S 1174 41S 1177 67 S 1180 41S 1184 43 S 1186 14 S 1189 38 E 5834 99 E 5895 O0 E 5957 6O E 6019 86 E 6081 71E 6143 69 E 6203 99 E 6263 78 E 6322 27 S 11 22 E 63 S 11 21E 49 S 11 19 E 58 S 11 15 E 56 S 11 10 E 2O S 11 5 E 58 S 11 1E 92 S 10 55 E 11 S 10 51E S 3 3 E 6377.73 S 1 58 W 6434 08 S 2 53 W 6490 56 S 2 37 W 6546 50 S 1 16 W 6602 79 S 0 13 W 6659 23 S 0 5 E 6715 79 S 0 5 E 6754 75 I 37 0 53 0 91 0 67 0 78 I 22 0 O0 0 O0 6265 38 S 1193.49 E 6378.04 S 10 47 E 6322 58 S 1193.83 E 6434.30 S 10 42 E 6380 37 S 1191.60 E 6490.69 S 10 35 E 6437 73 S 1188.70 E 6546.56 S 10 28 E 6495 28 S 1186.75 E 6602.80 S 10 21 E 6552 78 S 1185.95 E 6659.24 S 10 16 E 6610 24 S 1186.00 E 6715.79 S 10 10 E 6649 82 S 1186.05 E 6754.77 S 10 7 E COMPUTATION DATE: 10-APR-g2 PAGE 4 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 02-APR-1992 KELLY BUSHING ELEVATION: 87.39 FT ENGINEER: G. JOHNSON INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 O0 -87 39 0 0 N 0 0 E O0 996 66 909 O0 1902 30 1814 O0 2627 62 2540 O0 3374 65 3287 O0 4109 23 4021 O0 4858 06 4770 O0 5602 15 5514 O0 6353 72 6266 O0 7121 62 7034 'O O0 27 11 30 S 12 52 E 51 91 36 9 S 7 48 E 461 23 42 48 S 12 41 E 1147 26 42 20 S 14 51 E 1810 84 41 30 S 12 21 E 2487 67 41 24 S 12 0 E 3150 76 42 3 S 15 2 E 3816 33 39 9 S 6 53 E 4475 23 43 29 S 9 8 E 5114 21 55 93 70 98 61 94 75 41 0 O0 3 6 0 0 0 1 0 0 2 0 O0 n 06 48 89 452 58 1127 51 1771 21 2430 58 3080 18 3728 74 4375 03 5010 0 O0 E 49 S 19 86 S 89 20 S 217 05 S 381 63 S 540 95 S 668 39 S 832 74 S 954 70 S 1032 000 N 0 0 E 65 E 52 51E 461 59 E 1148 87 E 1811 60 E 2490 10 E 3152 48 E 3820 98 E 4478 55 E 5115 32 S 22 4 E 62 S 11 11E O1 S 10 56 E 75 S 12 10 E 02 S 12 32 E 56 S 12 14 E 2O S 12 35 E 74 S 12 19 E 99 S 11 39 E 10000.00 7873.19 7785.80 37 1 S 10 45 E 5772.52 11000.00 8666.42 8579.03 33 56 S 3 3 E 6377.73 11669.00 9213.84 9126.45 35 1 S 0 5 E 6754.75 0.55 5660.23 S 1139.03 E 5773.70 S 11 23 E 1.37 6265.38 S 1193.49 E 6378.04 S 10 47 E 0.00 6649.82 S 1186.05 E 6754.77 S 10 7 E COMPUTATION DATE' lO-APR-92 PAGE 5 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY' 02-APR-1992 KELLY BUSHING I::IEVATION' 87,39 FT ENGINEER' G. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURE[) VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGU~R COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOLFTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0 O0 87 39 187 39 287 40 387 40 487 41 587 44 687 57 788 07 889 03 0 O0 87 39 187 39 287 39 387 39 487 39 587 39 687 39 787 39 887.39 -87 39 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 0 0 N 0 0 E 0 24 N 78 27 E 0 23 N 85 26 E 0 30 S 83 12 E 0 46 S 69 58 E I 2 S 53 32 E I 51 S 36 4 E 4 6 S 21 57 E 6 55 S 16 37 E 8 48 S 15 18 E 0 O0 0 12 0 14 0 29 0 76 I 67 3 67 8 39 18 16 31 91 0 O0 0 22 0 35 0 23 0 46 0 40 1 27 3 79 1 54 i 17 O00N 0 04S 0 05 N 0 03 N 0255 0 945 2 68S 7.08 S 16.44 S 29.75 S 0 O0 E 0 42 E I 08 E I 83 E 2 87 E 4 19 E 5 80 E 8 02 E 11 12 E 14 88 E 0 O0 N 0 0 0 1 1 2 4 6 10 19 33 42 S 84 16 08 N 87 20 83 N 88 57 88 S 85 0 29 S 77 19 39 S 65 11 70 S 48 33 85 S 34 5 26 S 26 35 990 55 1093 1198 1307 1415 1523 1632 1743 1861 1981 987 39 33 1087 63 1187 03 1287 68 1387 81 1487 99 1587 80 1687 18 1787 66 1887 900.00 11 10 39 1000.00 15 37 39 1100.00 21 3 39 1200 O0 23 33 39 1300 O0 22 23 39 1400 O0 22 52 39 1500 O0 24 8 39 1600 O0 28 15 39 1700 O0 33 23 39 1800 O0 35 3 S 13 16 E 49.35 S 9 41E 72.96 S 10 54 E 105.81 S 13 50 E 147.58 S 14 2 E 189.97 S 11 11E 231.06 S 8 22 E 274.85 S 6 45 E 322.46 S 7 32 E 383.77 S 7 43 E 450.89 4.45 4 27 4 95 0 58 0 73 2 55 I 16 6 64 0 73 4 87 46.67 S 69.84 S 102.24 S 143.01S 184 23 S 224 36 S 267 52 S 314 79 S 375 68 S 442 28 S 19 23 E 23 29 38 48 57 65 71 79 88 50.48 S 22 24 E 80 E 73.78 S 18 49 E 28 E 106.35 S 15 59 E 55 E 148.11 S 15 S E 82 E 190.59 S 14 51E 83 E 231.69 S 14 27 E 25 E 275.36 S 13 42 E 41E 322.79 S 12 47 E 15 E 383.93 S 11 54 E 07 E 450.96 S 11 16 E 2112 46 1987 39 1900 O0 45 17 2259 2400 2537 2674 2809 2945 3081 3218 3353 03 2087 75 2187 92 2287 40 2387 44 2487 20 2587 74 2687 46 2787 35 2887 39 2000 39 2100 39 2200 39 2300 39 24O0 39 2500 39 2600 39 2700 39 2800 S 7 18 E O0 47 13 S 7 3 E 641 O0 43 4 S 8 47 E 742 O0 43 21 S 14 0 E 835 O0 42 10 S 14 15 E 928 O0 42 20 S 13 42 E 1019 O0 42 45 S 12 57 E 1110 O0 43 6 S 12 31E 1203 O0 42 39 S 13 44 E 1296 O0 41 14 S 13 44 E 1387 534 79 79 04 88 51 O7 76 65 76 10 7 32 0 62 i O3 1 68 0 21 0 66 0 37 0 12 0 42 0 59 525 53 S 631 731 823 913 1001 1090 1181 1272 1360 99 17 E 534.81 S 10 41 E 86 S 112 30 S 125 51S 143 52 S 166 56 S 188 92 S 209 63 S 229 50 S 250 40 S 272 50 E 641.79 S 10 6 E 89 E 742.06 S 9 46 E 36 E 835.90 S 9 53 E 21 E 928 51 S 10 19 E 22 E 1019 10 S 10 39 E 34 E 1110 83 S 10 52 E 74 E 1203 76 S 11 0 E 56 E 1296 93 S 11 8 E 17 E 1387 36 S 11 19 E 3485 90 2987.39 2900 O0 40 46 3618 3749 3882 4017 4152 4289 4426 4563 4701 08 3087.39 3000 O0 40 42 66 3187.39 3100 O0 40 23 12 3287.39 3200 O0 41 52 23 3387.39 3300 O0 42 20 54 3487.39 3400 O0 42 35 09 3587.39 3500.00 43 7 22 3687.39 3600.00 43 15 86 3787.39 3700.00 43 29 10 3887.39 3800.00 42 46 S 14 38 E 1473 92 S 15 39 E 1560 S 15 0 E 1645 S 15 15 E 1731 S 14 42 E 1822 S 14 10 E 1913 S 13 58 E 2005 S 13 39 E 2O99 S 13 25 E 2194 S 13 11E 2287 02 19 74 27 20 96 61 02 89 1 53 0 44 0 40 1 35 0 64 0 74 0 31 0 16 0 29 0 64 1444 85 S 293 05 E 1474 27 S 11 28 E 1528 1610 1694 1782 1870 1960 2051 2143 2235 20 S 316 66 S 338 55 S 361 27 S 384 60 S 407 78 S 429 91S 452 85 S 474 33 S 496 O0 E 1560 68 E 1645 15 E 1732 83 E 1823 33 E 1914 97 E 2007 35 E 2101 47 E 2195 10 E 2289 53 S 11 41E 88 S 11 52 E 60 S 12 2 E 34 S 12 11E 44 S 12 17 E 37 S 12 22 E 18 S 12 26 E 73 S 12 29 E 72 S 12 31E COMPUTATION DATE: lO-APR-92 PAGE 6 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 02-APR-lg92 KELLY BUSHING ELEVATION' 87.39 FT ENGINEER' G. JOHNSON INTERPOLATE/) VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4836.83 3987.39 3900.00 42 5 4970 84 4087.39 4000.00 41 30 5104 5238 5371 5505 5639 5772 5905 6039 50 4187.39 4100.00 41 41 17 4287 39 4200.00 41 24 75 4387 39 4300.00 41 40 47 4487 39 4400.00 41 35 11 4587 39 4500.00 41 32 41 4687 39 4600.00 41 24 80 4787 39 4700.00 41 18 07 4887 39 4800.00 41 19 S 12 56 E 2379 54 S 12 26 E 2468 S 11 48 E 2557 S 11 31E 2645 S 11 7 E 2734 S 10 18 E 2823 S 9 42 E 2911 S 11 21E 3OOO S 11 20 E 3088 S 12 49 E 3176 67 30 97 52 30 95 09 34 41 O. 97 0.16 0.40 0 15 0 47 0 62 0 34 0 16 0 36 I 06 2324.71S 516.91E 2381.48 S 12 32 E 2411.75 S 536.45 E 2470.70 S 12 32 E 2498.45 S 555.10 E 2559.38 S 12 32 E 2585.32 S 573.02 E 2648.06 S 12 30 E 2672.16 S 590.43 E 2736 61 S 12 28 E 2759.40 S 606.89 E 2825 35 S 12 24 E 2846.74 S 622.09 E 2913 92 S 12 20 E 2933.38 S 638.29 E 3002 02 S 12 17 E 3019.92 S 655.71 E 3090 28 S 12 15 E 3106.17 S 673.63 E 3178 38 S 12 14 E 6172 80 4987 39 4900.00 42 4 6308 6442 6576 6710 6845 6980 7114 7249 7384 33 5087 53 5187 50 5287 79 5387 41 5487 12 5587 64 5687 38 5787 96 5887 39 5000 O0 42 23 39 5100 39 5200 39 5300 39 5400 39 5500 39 5600 39 5700 39 5800 O0 41 42 O0 41 46 O0 41 58 O0 42 3 O0 42 4 O0 41 52 O0 42 19 O0 42 6 S 13 2 E 3265 08 S 13 33 E 3356 S 14 52 E 3445 S 14 49 E 3534 S 14 54 E 3623 S 14 50 E 3713 S 15 I E 3803 S 13 20 E 3893 S 12 45 E 3983 S 11 59 E 4075 44 69 55 89 71 67 39 60 O8 0 75 2 O1 0 95 0 28 0 14 0 11 0 14 I 16 0 44 2 18 3192 64 S 693 76 E 3267 15 S 12 16 E 3281 3368 3454 3541 3628 3715 3802 3890 3980 74 S 714 40 S 736 56 S 759 21S 782 31S 805 53 S 829 62 S 851 64 S 871 02 S 891 49 E 3358 62 S 12 17 E 85 E 3448 05 S 12 20 E 70 E 3537 11 S 12 24 E 64 E 3626 67 S 12 28 E 79 E 3716 71 S 12 31E 02 E 3806 89 S 12 35 E 60 E 3896 81 S 12 37 E 84 E 3987 :~3 S 12 38 E 67 E 4078.68 S 12 38 E 7518.02 5987.39 5900 O0 41 7 7650.75 6087.39 6000 O0 41 10 7783 73 6187.39 6100 O0 41 3 7914 52 6287.39 6200 O0 39 19 8043 43 6387 39 6300 O0 39 7 8171 98 6487 39 6400 O0 39 22 8301 57 6587 39 6500 O0 39 17 8429 85 6687 39 6600.00 37 39 8556 32 6787 39 6700.00 38 5 8685 74 6887 39 6800.00 41 13 S 10 41E 4162 82 S 9 37 E 4250 S 7 56 E 4337 S 7 1E 4421 S 6 55 E 4503 S 7 59 E 4583 S 6 45 E 4666 S 4 3 E 4746 S 4 50 E 4823 S 6 21E 4905 11 73 93 13 77 12 17 21 01 0.76 O. 65 1.41 1.56 O. 92 2.45 1.62 1.75 0.72 3.03 4066 10 S 908 72 E 4166.41 S 12 36 E 4152 02 S 924 4238 63 S 937 4322 21S 948 4402 96 S 958 4483 16 S 967 4564 79 S 979 4644.77 S 986 4721.95 S 992 4803.75 S 1000.25 E 4906 14 E 4253 62 S 12 33 E 59 E 4341 58 E 4425 29 E 4506 95 E 4586 3O E 4668 87 E 4748 95 E 4825 O9 S 12 28 E O7 S 12 23 E O4 S 12 17 E 46 S 12 11E 66 S 12 6 E 45 S 12 0 E 22 S 11 53 E 78 S 11 46 E 8819 65 6987 39 6900 O0 41 30 8953 9091 9228 9363 9499 9633 9763 9892 10017 22 7087 21 7187 05 7287 48 7387 18 7487 70 7587 85 7687 89 7787 79 7887 39 7000 39 7100 39 7200 39 7300 39 7400 39 7500 39 7600 39 7700 39 7800 O0 42 25 O0 43 42 O0 42 40 O0 42 22 O0 42 51 O0 40 10 O0 39 53 O0 37 3 O0 37 6 S 9 29 E 4993 98 S 9 20 E 5082 S 8 3 E 5177 S 5 53 E 5270 S 9 27 E 5362 S 8 3 E 5453 S 11 31E 5543 S 11 26 E 5626 S 11 23 E 5708 S 10 48 E 5783 53 58 8O 03 73 64 go 41 24 I 65 2 37 2 14 0 86 0 61 0 73 3 14 0 7O 3 35 0 64 4891 93 S 1012.61 E 4995 64 S 11 42 E 4979 5073 5165 5256 5347 5435 5517 5597 5670 23 S 1027.44 E 5084 17 S 1042.12 E 5179 93 S 1052 97 E 5272 36 S 1065 60 E 5363 01S 1079 63 E 5454 82 S 1093 77 E 5544 33 S 1110 92 E 5628 28 S 1126 87 E 5709 77 S 1141 04 E 5784 13 S 11 4O E 10 S 11 36 E 16 S 11 31E 28 S 11 28 E 92 S 11 25 E 77 S 11 23 E 07 S 11 23 E 59 S 11 23 E 42 S 11 23 E COMPUTATION DATE: lO-APR-92 PAGE 7 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 02-APR-1992 KELLY BUSHING ELEVATION: 87.39 FT ENGINEER: O. JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH -rRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGU~R COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMLFFH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMLFFH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/100 FEET FEET FEET DEG 10143 76 7987 39 7900 O0 37 50 S 10 11 E 5859 84 10270 10398 10527 10654 10780 10904 11025 11147 11270 93 8087 90 8187 22 8287 22 8387 40 8487 35 8587 30 8687 86 8787 07 8887 39 8000 39 8100 39 8200 39 8300 39 8400 39 8500 39 8600 39 8700 39 8800 O0 38 25 S 6 52 E 5938 O0 38 42 S 4 5 E 6017 O0 38 54 S 2 16 E 6097 O0 37 28 S 3 52 E 6175 O0 37 38 S I 34 E 6251 O0 34 42 S 4 23 E 6324 O0 34 12 S I 47 E 6391 O0 35 12 S 2 2 W 6461 O0 35 8 S 2 52 W 6529 1 42 5746 03 S 1155 25 E 5861 O1 S 11 22 E 35 1 92 67 0 36 0 65 19 0 77 4 26 70 0 63 5823 49 5903 61 5983 66 6061 84 6138 83 6211 60 6279 51 6350 49 6420 70 S 1166 18 S 1174 50 S 1178 65 S 1182 50 S 1186 61S 1189 53 S 1194 36 S 1192 51S 1189 95 E 5939 55 E 6018 53 E 6098 95 E 6176 68 E 6252 97 E 6324 11E 6392 91E 6461 53 E 6529 47 S 11 20 E 90 S 11 15 E 46 S 11 9 E O0 S 11 3 E 15 S 10 56 E 56 S 10 51E 06 S 10 46 E 43 S 10 38 E 78 S 10 30 E 11392.38 8987.39 8900.00 35 10 S 1 21W 6598.48 11514.61 9087.39 9000.00 3S 0 S 0 I W 6667,49 11636.71 9187.39 9100.00 35 I S 0 5 E 6736.52 11669.00 9213.84 9126.45 35 I S 0 5 E 6754.75 0.63 6490.89 S 1186.85 E 6598.50 S 10 22 E 2.74 6561.17 S 1185.93 E 6667.49 S 10 15 E 0.00 6631.30 S 1186.03 E 6736.52 S 10 8 E 0.00 6649.82 S 1186.05 E 6754.77 S 10 7 E COMPUTATION DATE' lO-APR-g2 PAGE 8 BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY' 02-APR-1992 KELLY BUSHING ELEVATION' 87.39 FT ENGINEER' G. JOHNSON INTERPOLATED VALUES FOR CHOSEN HORIZONS MARKER TOP 5 1/2" CASING BOTTOM 7 6/8" CASING GCT LAST READING BOq-FOM 6 1/2" CASING SURFACE LOCATION = 982' FNL & 1926' FWL, SEC19 TllN R12E MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 10739.00 8454.65 8367.26 11012.00 8676.37 8588.98 11520.00 9091,80 9004.41 11664.00 9209.74 9122.35 11664.00 9209.75 9122.36 6113.18 S 1185.80 E 6272.08 S 1193.82 E 6564.34 S 1185.95 E 6646.95 S 1186.05 E 6646,96 S 1186,05 E BP EXPLORATION Z-16 (32-30-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA MARKER COMPUTATION DATE: lO-APR-g2 PAGE 9 DATE OF SURVEY: 02-APR-1992 KELLY BUSHING ELEVATION: 87.39 FT ENGINEER: G. JOHNSON ************ STRATIGRAPHIC SUMMARY SURFACE LOCATION = 982' FNL & 1926' FWL, SEC19 T11N R12E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 11664.00 9209.75 9122.36 6646.96 S 1186.05 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 11669.00 9213.84 9126.45 6754.77 S 10 7 E DIRECTIONAL SURVEY COMPANY BP EXPLORATION FIELD PRUDHOE BAY Z-16 (32-30-11-12) COUNTRY USA RUN ONE DATE LOGGED 02 - APR - 92 DEPTH UNIT FEET REFERENCE 92248 M InlrpretMlons are opinion8 based on in/emnees h'om eleClTiOal or other meaaJremerl~ and w~ canno~ ~ do mX guarantee I~e am~ura~--y or ~orreclnes~ M any Wrpretal~on~ an4 we shall n~, except In the r.4ae o1' grosa or ~ neglgenee off our part. be Ilal)le or responMI)le ror any lose, ooet~, damagee or exT)®flsea InctMTed or i~BtaJn4(:l I]y anyone reaJ~ng Imm any Inte~pretal~on made by any of our o~lcem, agerl~ or employees These Inte~prltal~om am ~ ~A)}ec~ t~ our General Terms and CM3dll~on~ a~ .t ou~ I~ our current p~ ~edule, WELL' Z-16 (32-30-11-12) (982'FNL,1926'FWL,SEC 19,T11N,R12E) HORIZONTAL PROJECTION 2000 '-.~---~--.h..! ...... ~--.i---!---~ ...... ~---!'--~-'-~-' :::: :::: :::: :::: :::: "':'" ...F.F.i...i ....... !...~..T..! ...... ;..?...;...~ ............ ...... ?..~...~...; ...... r..~...?..~ ................................................................................................................ "'?"!"'F"~ ..... !'"F"F'? ...... ?!'"!'"!"'"'?'!'"!""; ....... !"'?!'"! ...... F"F"F"! ...... F"!"'?'~ ...... !"'F"i'"~ ...... !'"F"!'"! ...... !"'F"!'"~ ...... :'"~'":'": ...... :'":'"~'": ...... :'":'":'"~'"!'":'":'-:"': ...... :--~---r-: ......... ;~:: ::::~:::~ :::: :~:; :::: :::: :::: :::: :::: :::; ~:~:,:::: :::: .... ~.: ..... ~..~ ~ ........ : ......... ~ .: ....... ~ ...... :: ...... :;:: :::: :::;.;::: :::: :::; ;::: :;;~ :;~: ;::: :;:: ::~: ;:;: ;::: ;::: '-'~---r--~---~ ...... :-.-:.--:---: ...... :-.-:---:---: ...... :"':'"~"':'""":'":'":'": ...... :"'~'":'": ...... !'"!"'!'"~ ...... F"!'"!'"! ...... F"F"F"! ...... ?'F"!'"F','"F"~'"F"! ...... !'"F"F"! ...... !-'!'"!'"! ..... ?"F-!-~ ...... F-F-F-! ..... ........ - .... -'i'"!"i"i ...... i"i"i'"~'' ........................... "'?"?"~'"~ ...... !'",'"~"? ...... ?"??"~ ...... ~"'?"!"'?" .-:...:.--:---~ ....... :---~---~---~ ...... :.--~.-.~...t ...... :..-:...:.-.: ...... :...t-..~-..~ ..... :...r--:-..~-.. ~;:; ;~;: ;:;; :::; :::: ;;:: :::; :::: :::: ..................... : ...... · 'i"i"i"i ...... ~"+'+"~ ...... h--~.--~---! ..... ~--+.-~-.-! ...... i--+-+--! ...... ~---~--+--i ...... ~.--~--->---~ ...... i--+--i---~ ...... ~--+--~---~ ...... i---~---i---~...,..-i...i...i...i ...... i-.-i...i--.i ..... i-..i...i.-.i ...... !..-i.-i-.~ ...... ...... F"!'"F"~ ...... ?i"'!'"~ ...... F"'F"?'~ ...... F"F"i'"~ ...... F"!'"?¢ ....... F"!"?"~ ...... F"!'"!'"~ ...... ?'?"?"~ ...... ~'--~-..i-.-h.,!.--h--~-..~...i ..... ~---i---h-.~ ..... ~...h--i-..i ...... i.-.~..-i.-.~ ....... ~.o4-.i.-~ ....... "'!'"i"i'"! ...... i"i"'~"i ...... h"hi"i ..... i"i"i-i ...... ?'~'"?"~ ..... ?"?!"'! ...... ~'"!"'!'"!'"."i'"i"i'"! ...... i'"~'"!'"i ...... ............................ ~"'~"+"~ ....... ~-..~...~..-i ...... ~-.-~..+-.~ ...... ~-+->--~ ...... ~--~-+-> ....... !-+-~-.! ...... ..;...~...:...: ...... :...L..: .... : ~ ..... :...~...L..; ....... ~ :...;...~. . ~-..: .... ~ ..... :...;...:...: ..... :..: ....... ;...; ...... ;...:...~...~ ..... :..;...~...: ...... :...:...;...;... :::; ;: ."'":'":"':"'. ...... . ......... -' ::: ::::1:::~ ;:;: :::::~:: ~:;: :::: ;::: ;;:: ;::; · -.~..-~-.-~.-.i ...... c...:...L..! ...... ,...,...,...,...,...,...,...,..., ...... :...2...:...: ...... ,...,...,...,..,...,...,...,..., ....... :...:...:...~ ...... ,...,...,...,...,...,...,...,..., ...... ~...:...:...: ..... :...L..}...: ....... :...c...:...; ...... ;...:...:...~ ...... :...;...:...: ...... · "='"~.--f---~ ...... ~.--~--.:--.~ ...... ~---:--.¢.--~ ...... :---r.-.r-.-: ...... :-'-:--':'--= · ................................ ~ ::: :;::~::; :::: ::;: :;:: :::: :::: :::: :;:: :::: :;:: :::: :::: :::: i~!! .... :!!: i ......................................~.i...!...L..i ...... L..L..L..L.. · ..!...??.-.! ...... ?..!...?.-!.-,...?.:...:...: ....... :..-;--.:-.-: ...... ;..-:...:---: ...... ;.--;:: ;::: :::: ::;: "F-!"'F"~ ..... !"'!"'!"'?'~'"!'"~"'~'"~ ....... Y"!'"F"~ ...... !'"!'"?! ...... !"'F"F"! ...... F"F'?"~ ....... !'"!'"!'"~ ...... !'"F"F"~ ..... !"'!'"F"~ .... 5-'i--'i'--~ ...... i.--!.--~-.-~ ...... i---i"-!---i ...... ?--i'"i--i ...... i'--i--'i---i ...... !---U---i ..... i--i--i---i ...... h!---!---! .... ~-'-U:-~'--!--i---i--'i ...... i---i.+-i.-..-.i--.!..-~.--i ...... hi-..i-.-i ...... ?-"!"i ...... ?-'! ...... '":.":"'~"': ..... :'-':'":"': ...... ~'":"':'-': ..... :"-:'":-": ...... :--':---:---:'"F--:---:---:---: ...... t-..:--.:.-.: ...... :.--:---:-..: ..... ~.-.:-:.-.: ...... :-.-:.--:-.-: ...... :...~...:...: ...... :---:...:.-.: ...... ~...:.--:..-: ...... :---~-..~-.: ...... :--:.--:..-: ...... :--:..-: · --!...i--.i--i---:-..i.-i..-h-! ...... i---i---i.--i ...... i---!---i---i ...... i..i-..!---i ...... i---!-.-i---i ...... i--.i-.-i..-i ...... i---~.-.i--.i-..?-i--i.-'~i ...... i..-~.-i.--i ...... i--i-.i..-~ ...... i-.-!--.i.-i-..:...~.--i-.-~-..~ ...... !--.i--i-.?-.~-+-i-.i ....... hi-i-+- · --f.--~ ...... ! ....... i ...... i.-i ......... h-i ......... i--i ...... i--.t ...... f ............ i ..................... i .................. i...i---f ...... ~-i ............ ~.--! ......... i ...... i ............ i..-! ...... i ......... i ...... !...f.-i...i ..... f ...... i ............ i ...... .o-~---~..-~.--~ ...... ~---;.--:---~ ...... ~---:---:---:--..-~---:---;-.-:-..i--.~--.~-.-L--; ...... :--.;.--;-.-: ...... :.--:---;---:.-----:---:---:---:--.;---:.--:---: ..... ''--;...i---:--.:--.:-..; ...... :...:...L..:......~...~...~...~ ...... h..L..~...: ..... Lo.L..:.-: ...... "'?"~'"!'"~ ...... ~'"~"'?~ ...... ?'!"'?"~'"~'"~'"?"! ....... ?"?"~ ?"!"'~'"~ ...... ~'"?'?"?"~"'???"~ ....... ~"?'"?~~..~.~...`...~..."..".....~...~...~..."...."..~...~,..~......~...~...~...~.....?~..~??"??"?"???."".?"?"?."?"??. ZE]]]ZE] '--i-'i-'i'--! ...... i-'i-'i--i ...... i-'i-'i'--i .... i'-'i---!--i ....... !-'i-'i"i ...... h'i-'-!'-'! ...... i-'i-'i-i ..... i"'i---f'"~ ....... i---!--i--~ ....... :~::,:~:: : ............. ~ .--i--.,--i.-i ...... i--i--i--i ...... h-i--i--i ..... i---h--i-.i ....... !-..!---i---! ...... i--i--i--i ...... i--i-.-i--i ..... i--i.-i--i ....... i-.i--i--.h, ti-'-r~O~-!".i--i"i ...... i--i.-i.-.! ..... i..i..i..i ...... i-..h'.i..i ..... i-.i..i..i ...... i---~.--i.-i.--i "'r'":"'='": ...... :'":"'~'": ...... :'":"'='": ..... ~"'~'"~"': ...... :"'='"~'": ...... ~"'?"?"~ ...... ~'"t'"t'"¢ ..... !'"!"'!'"~ ...... :'"~'":'": ..... ' ....................................................... ..-i...i-..i.--i ...... i...i...i.-.i ...... i-.-i-..i.--i ..... i---i..-~-.-i ...... i.-.~-.-~-.-i ...... i---~.-+..~ ...... ~--.i-.-i---i ..... ~---~--+--~ ...... i...i...i.-~....~ "'i'"i"'i'"i ...... i"-i'"i'"i ...... i'"i'"i'"i'":'--i"'i"'i"'i ...... !'"i'"i"'i ...... i"'i'-'i'"i ...... i'"i"'i'"i ..... i'"!'"i'"i ....... ?"?'-?'-,-'-i-~i~m~i'-'i-"i'-'i ...... !-"i'"i'"!'";"'i'-'i'"i-"i ...... i'"i'"i'"i ...... i-'i"'i-'i ...... "'!'"?!'"! ...... F"!'"F"! ...... ~'"F"!'"~ ...... !"'F"!'"? ...... F"!'"F"! ...... !"'?F"~ ...... ?F"Y"~ ...... !'"!'"!'"! ...... ?Y"!'"~ ...... :"'F":'"; ...... !'"!'"F"~ ..... i'"!'"!"'i"r"F"!'"!'"! ...... F"F-?~ ...... ~-'~-'i-'i ...... ...~--.~...:-..: ...... :.--:...~.-.:..-'.-.:.-.:..-:...: ...... :...1...:...: ...... :...:...:..-: ...... :...:.-.:---: ...... :-..:.--;.-.: ...... :...;...;...; ...... ~...~---~--.~.--~.--~...i ....... : ...... :.-.r--t---: ..... ~.-.:...~-..~ ...... r...~---~..-: ...... :-..:--~-.: ....... :--:.-.:--: ...... "'i'"?F"~ ...... !"'F'F"F'i'''?r°'?~ ....... ?!'"!'"! ...... ?'?F'i ...... F'?F'!'"~"'F'F"F'F'~'"F'F'!'"i ...... !'"F'F"~ ....... FT";'"i ...... i'"F'!'"~ ....... !"T'T"i ....... F'T'T"~ ...... i-T-Fi ...... i-7-!-! ...... ["~"7'i'"i ...... i"'?'T"! ...... !"T'T! ..... i"T'T"i ...... i"'i'"!'"i ...... i'"!"7'i ...... ........ ~"'~'"~'"~ ....... i'"!'"!'"i ...... i"'i'"i'"i ..... i'"i!~'''~'''~''';::,. ..... ~,,:~'"~'"?"~ ...... ,,~?'?'~ ....... ::,:~-'~-'~-'~ ...... ,~:,~?'*-':-'~-?-~-'~-'~-' '":'"~'"*'": ...... F"?'F"~ ...... F"F"F"~ ...... ?'F"!'"! ...... ~'"F"!'"! ...... !"?"F"! ...... F'?'"!'"! ...... F"!'"?~ ...... !"'!'"F"! ...... F"!'"Y"! ...... !"'?"F"[ ..... !'"!'"!'"! ...... !'"!'"i'"[ ...... F"!'-F-~ ...... !-'F-F-! ..... F'?'?°°?- WELL' Z-16 (32-30-11-12) (982'FNL,1926'FWL,SEC 19,T11N,R12E) VERTICAL PROJECTION -~ -~ 0 0 ~ ,~ ~0(0 80(0) l~ i ~ WEST EZLEEN/Z-16 500292224500 0,00 11036,00 CONPUTATZON DATE: 022692 TRUE SUB-SEA MEASD VERTZCAL VERTZCAL DEPTH DEPTH DEPTH 0 ,00 396 395,99 573 572,93 753 752,46 938 935,63 1127 1119,28 1318 1298,35 1505 1470,16 1695 1643,68 1886 1809,92 2075 1958,93 2391 2191,52 27O5 2422.34 2922 258.2,46 3250 2824,28 3597 3084,2! 3881 3297,55 4194 3529,46 4517 3766,26 4822 3990,94 5135 4224,82 5447 4459,03 5760 4694,36 6074 4930,61 6358 5143,81 6671 5378.05 6984 5611,93 7297 5844,35 7578 6054,30 7893 6295,44 SP__JF~RRY-SUN DRTLLTNG SERVTCES ANCHORAGE ALASKA 8202 6534.04 8519 6780,44 8834 7022,98 9148 7256,85 94.65 7490,38 PAGE DATE OF SURVEY: 022592 MWD SURVEY JOB NUMBER: AK-MW-20009 KELLY BUSHZNG ELEV. = 90.00 OPERATOR: BP EXPLORATZON ZNC FT. COURS COURSE D ZNCLN DZRECTZON DG MN DEGREES DG/ LS TOTAL RECTANGULAR COORDZNATES 100 NORTH/SOUTH EAST/WEST VERT. SECT. -90.00 305,99 482,93 66'2,46 845,63 0 0 N ,00 E ,00 0 42 S 81,30 E ,18 1 47 S 38,40 E ,78 6 11 S 18,20 E 2,53 9 48 S 13,20 E 1,98 .OON .OOE ,00 ,373 2,39E ,82 2,713 5,19E 3,66 14,163 9,98E 15,83 38,993 16,70E 41,49 1029 1208 1380 1553 1719 ,28 ,35 ,16 ,68 ,92 17 12 S 9.00 E 3.95 23 23 S 13.90 E 3.36 23 6 S 11.80 E .47 25 0 S 6,70 E 1.48 33 47 S 9.00 E 4,64 82,313 24.75E 147,093 38,30E 219,043 54,72E 295,423 67,03E 388,163 80,07E 85.55 151.72 2~ 50 302,81 396,32 1868 2101 2332 2492 2734 ,93 ,52 ,34 ,46 ,28 42 0 S 9,20 E 4,34 43 12 S 10,80 E ,51 42 12 S 15,40 E 1,04 42 42 S 14,10 E ,47 42 17 S 14,60 E ,16 502,703 98.44E 713,303 135,61E 920,603 183.77E 1062,233 221,05E 1276,913 275,96E 512.24 726,06 938,76 1084,93 1306,19 2994 3207 3439 3676 3900 ,21 ,55 .46 ,26 ,94 40 42 S 18,50 E ,88 1497,253 341.31E 41 54 S 16,80 E ,58 1675,853 398,10E 42 30 S 12,90 E ,86 1879,003 451,92E 43 12 S 13,90 E ,30 2092,673 502.84E 41 54 S 13,60 E ,43 2293,003 551,87E 1535.02 1721.25 1930.98 2150.47 2356.50 4134 4369 4604 4840 5053 ,82 ,03 ,36 ,61 ,81 41 24 S 11,50 E ,47 41 17 S 9,70 E ,38 41 12 S 11,50 E .38 41 12 S 13,20 E ,36 41 30 S 14,50 E ,32 2496,003 597.08E 2698,583 634.99E 2901,413 672,95E 3103,433 717.18E 3285,593 762.10E 2564.42 2770.5t 2976.85 3183.61 3371.02 5288 5521 5754 5964 6205 ,05 ,93 ,35 ,30 ,44 41 35 S 15,00 E ,11 3486.353 814.95E 41 42 S 15,20 E ,05 3687,183 869.14E 42 24 S 12.50 E ,62 3890.673 9!9,28E 40 54 S 10,30 E ,75 4073,683 956.23E 39 12 S 7,30 E ,82 4273,913 987,33E 3578.23 3785,75 3995,1! 4181,80 4384,26 6444 6690 6932 7166 7400 ,04 39 42 S 9,70 E ,52 ,44 38 17 S .5,30 E ,98 ,98 41 0 S 8,70 E 1,10 ,85 42 42' S 6,70 E ,69 ,38 42 24 S 6,60.E ,10 4468.043 1016,36E 4665.703 1042.50E 4865,103 1067,15E 5072,663 1095.16E 5285,583 1119,98E 4580.34 4779. o°2 4979.71 5188.76 5402.45 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE WEST EILEEN/Z-16 500292224500 0,00 11036,OO COMPUTATION DATE: 022692 DATE OF SURVEY' 022592 MWD SURVEY JOB NUMBER: AK-MW-20009 KELLY BUSHING ELEV, = 90,00 OPERATOR: BP EXPLORATION ZNC FT, TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL ZNCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DLS TOTAL RECTANGULAR COORDINATES DG./IO0 NORTH/SOUTH EAST/WEST VERT. SECT, 975'1 7706,26 7616,26 39 35 S 11,50 E 1,49 5470,78S 1149,25E 10029 7924,72 7834,72 36 47 S 9,20 E 1,13 5639,84S 1180.24E 10278 8122,38 8032,38 38 5 S 7,30 E ,70 5789,65S 1201,92E 10468 8271,23 8181,23 38 47 S 1,50 E 1,93 5907,34S 1210,93E 10625 8395,12 8305,12 37 0 S 4,50 E 1,64 6003,63S 1215,93E 5589,80 5761,66 5912.84 6030,04 6125.46 10848 8575,39 8485,39 35 5 S 5,90 E ,93 6134,30S 1227.78E 10943 8653,59 8563,59 34 5 S 2,90 E 2,08 6188,06S 1231,94E 11036 8730,60 8640.60 34 5 S 2,90 E ,00 6240,14S 1234,57E 6255,95 6309.50 6361,09 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 6361,09 FEET AT SOUTH 11 DEG, 11 MIN, EAST AT MD = 11036 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 168,81 DEG, SP~.ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE WEST EZLEEN/Z-16 500292224500 0,00 11036,00 COMPUTATION DATE: 022692 DATE OF SURVEY' 022592 MWD SURVEY JOB NUMBER" AK-MW-20009 KELLY BUSHING ELEV, = 90,00 OPERATOR' BP EXPLORATION INC FT, INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 ,00 -90,00 ,00 N ,00 E 1000 996,48 906,48 50,56 S 19,19 E 2000 190t,80 1811,80 454,74 S 90,70 E 3000 2639,78 2549,78 1113,53 S 233,93 E 4000 3385,98 3295,98 1752.37 S 420,12 E ,00 3,52 3,52 98,20 94.68 360.22 262.02 614,02 253.80 5000 4123,55 4033,55 2408,51 S 579,28 E 6000 4874,94 4784,94 3055,98 S 706,05 E 7000 5623.88 5533,88 3697,45 S 871,93 E 8000 6378,36 6288,36 4340,99 S 995,92 E 9000 7148.08 7058,08 4972,98 S 1083,45 E 876,45 262,43 1125,06 248,62 1376,12 251,06 1621,64 245,52 1851,92 230.27 10000 7901,54 781'1,54 5622,64 S 1177,41 E 11000 8700,79 8610,79 62t9,98 S 123'3,55 E 11036 8730,60 8640,60 6240.14 S 1234,57 E 2098,46 246.54 2299,2! 200.75 2305,40 6.19 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF MINIMUM CURVATURE METHOD. SPERRY-SUN DRZLLZNG SERVZCES "~-"" ANCHORAGE ALASKA PAGE 4 WEST EZLEEN/Z-16 500292224500 0.00 11036.00 COMPUTATZON DATE: 022692 ZNTERPOLATED VALUES FOR EVEN DATE OF SURVEY: 022592 MWD SURVEY JOB NUMBER: AK-MW-20009 KELLY BUSHZNG ELEV. = 90.00 OPERATOR: BP EXPLORATZON ZNC 100 FEET OF SUB-SEA DEPTH FT. TRUE NEASD VERTZCAL DEPTH DEPTH SUB-SEA VERTZCAL DEPTH TOTAL RECTANGULAR COORDZNATES NORTH/SOUTH EAST/WEST MD-TVD VERTZCAL DIFFERENCE CORRECTZON 0 .00 -90 90 90.00 190 190.00 100 290 290.00 200 390 390.00 300 .00 .00 .00 .00 .00 .00 N .00 E .00 N .00 E .00 S .01 E .17 S 1.11 E .35 S 2.32 E .00 .00 .00 .00 .00 .01 .01 .01 .01 490 490.00 400 590 590.00 500 690 690.00 600 790 790.00 700 891 890.00 800 .00 .00 .00 .00 .00 .72 S 3.58 E 3.21 S 5.54 E 8.60 S 8.02 E 18.30 S 11.28 E 3t.71 S 14.93 E .02 .01 .08 .05 .26 . 19 .79 .53 1 .76 .97 993 990.00 900 1096 1090.00 1000 120t 1190.00 1100 1308 1290.00 1200 1417 1390.00 1300 .00 .00 .00 .00 .00 49.23 S 18.91 E 73.71 S 23.36 E 105.47 S 28.92 E 143,63 S 37.46 E 185.57 S 47.71 E 3.37 1.62 6.45 3.07 11.53 5.O9 18.93 7.39 27.85 8.92 1526 1490.00 1635 1590.00 1746 1690.00 1862 1790.00 1984 1890.00 1400 1500 1600 1700 1800 .00 .00 .00 .00 .00 227,39 S 56,41 E 270.95 S 63,83 E 318.06 S 69,85 E 375,27 S 78,06 E 445,54 S 89,22 E 36.59 8.74 45.92 9.33 56.64 10.72 72.19 15.55 94.96 22.77 2116 1990.00 2251 2090.00 2388 2190.00 2525 2290.00 2661 239O.00 1900 2000 2100 2200 2300 .00 .00 .00 .00 .00 530.31 S 102.91 E 619.65 S 117.74 E 711.89 S 135.34 E 803.10 S 154.33 E 892.22 S 176.12 E 126.81 31.85 161.73 34.92 198.91 37.18 235.58 36.68 271.30 35.71 2796 2490.00 2932 2590.00 3068 2690.00 32O3 2790.00 3338 289O.OO 24OO 2500 26OO 2700 2800 .00 .00 .00 .00 .00 979.75 S 200.06 E 1068.98 S 222.74 E 1158.48 S 245.22 E 1246.72 S 268.10 E t334.22 S 291.41 E 306.33 35.03 342,26 35.93 378,33 36,07 413,.65 35,31 448,55 34.91 3472 2990.00 3604 3090.00 3736 3190,00 3870 3290,00 4005 3390,00 2900.00 3000.00 3100.00 3200.00 3300.00 1419.32 S 316.33 E 1501.98 S 342.89 E 1583.57 S 370.18 E 1669.36 S 396.14 E 1755.88 S 421.07 E 482.21 33.66 514.64 32.43 546.56 31.92 580.85 34.29 615.42 34.57 SPERRY-SUN DRTLLZNG SERV:[CES , ANCHORAGE ALASKA PAGE NEST EZLEEN/Z-16 500292224500 0.00 11036.00 COHPUTATZON DATE: 022692 DATE OF SURVEY: 022592 NWD SURVEY JOB NUNBER: AK-NW-20009 KELLY BUSHZNG ELEV. = 90.00 OPERATOR: BP EXPLORATZON ZNC FT. ]:NTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE NEASD VERTZCAL DEPTH DEPTH 4140 3490.00 4276 3590.00 4412 3690.0O 4549 3790.00 4686 389O.00 SUB-SEA VERTZCAL DEPTH 3400.00 3500.00 3600.00 3700.00 3800.00 TOTAL RECTANGULAR COORDZNATES NORTH/SOUTH EAST/NEST 1843,87 S 443.66 E 1933,07 S 464.31 E 2023.15 S 485.64 E 2114,31 S 508,20 E 2204,97 S 530.57 E ND-TVD VERTZCAL DZFFERENCE CORRECTZON 650.52 35.10 686.11 35.59 722.38 36.28 759.56 37.18 ?96.39 36.83 4820 3990.00 4955 4090.00 5088 4190.00 5221 4290.00 5355 4390.00 5488 4490.00 5621 4590.00 5754 4690.00 5887 4790.00 6020 4890,00 3900.00 4000.00 4100.00 4200.00 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 2292.18 S 551.67 E 2379.39 S 572.77 E 2465.92 S 590.96 E 2552.31 S 608.53 E 2638.80 S 624.77 E 2725.40 S 639,58 E 2811.89 S 654.73 E 2897.67 S 672.19 E 2983.46 S 689.64 E 3068.81 S 709.06 E 830.74 34.35 865.09 34.35 898.59 33.49 931.90 33.31 965.11 33.22 998.22 33.11 1031.31 33.08 1064.21 32.91 1097.12 32.91 1130.02 32.91 6152 4990.00 6286 5090.00 6419 5190.00 6553 5290.00 6686 5390.00 4900.00 3154.05 S 729.05 E 5000.00 3239.50 S 750.18 E 5100,00 3325.15 S 772.33 E 5200,00 3410,84 S 794,72 E 5300,00 3496.60 S 817,70 E 1162.93 32.91 1196.15 33.23 1229.67 33.52 1263.25 33.58 1296.98 33.73 6820 5490.00 6954 5590.00 7O88 5690.00 7223 5790.00 7358 5890.00 5400.00 3582.36 S 840.68 E 5500.00 3668.32 S 864.02 E 5600.00 3754.30 S 887.38 E 5700.00 3842.22 S 908.54 E 5800.00 3931.37 S 928.30 E 1330.71 33.73 1364.63 33.92 1398.56 33.93 1433.40 34.84 1468.82 35.42 7492 5990.00 7625 6090.00 7756 6190.00 7885 6290.00 8015 639O.O0 5900.00 6000.00 6100.00 62OO.O0 6300.00 4018.88 S 946.27 E 4103.98 S 961.62 E 4187.63 S 975.24 E 4269.50 S 986.75 E 4350.40 S 997.13 E 1502.93 34.11 1535.14 32.21 1566.23 31.09 1595.98 29.75 1625.02 29.05 8144 6490.00 8274 6590.00 8403 6690.00 85'31 6790.00 8659 6890.00 6400.00 6500.00 6600.00 6700.00 6800.00 4432.00 S 1010.20 E 4513.63 S 1023.75 E 4594.06 S 1034.81 E 4673.24 S 1043.22 E 4753.59 S 1051.88 E 1654.76 29.74 1684.55 29.79 1713.37 28.82 1741.20 27.83 1769.78 28.58 WEST EILEEN/Z-16 500292224500 0.00 11036.00 COMPUTATZON DATE: 022692 SPERRY-SUN DRZLLZNG SERVZCES ANCHORAGE ALASKA PAGE DATE OF SURVEY: 022592 NWD SURVEY JOB NUHBER: AK-HW-20009 KELLY BUSHZNG ELEV. = 90.00 OPERATOR: BP EXPLORATZON ZNC FT. ZNTERPOLATED VALUES FOR EVEN t00 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTZCAL VERTZCAL RECTANGULAR COORDZNAT DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WE ES ND-TVD VERTZCAL ST DIFFERENCE CORRECTION 8790 6990.00 690,3.~0 4836.94 S 1062.96 ~: 1800.4~ 30.66 8922 7090.00 7000.00 4922.69 S 1075.97 E 1832.8(3 32.3'7 9057 7190.00 7100.00 5011.40 S 1087.96 E 1867.04 34.23 9193 7290.00 7200.00 5103.04 S 1L, 9,, 73 E 190~.11 ,.~6.07 9329 7390.00 7300.00 5194.53 S 1'09.45 E 1939.07 35.96 9464 7490.00 7400,00 ~:~"8~,.~* ~ ~ 111q ..... 95 E 197~ 48 ~.;5.:~1 9598 7590.00 7500.00 5373.63 S 1!31.88 E 2008.4.9 2;4.01 9729 7690.00 7600.00 5457.53 S t146.61E 2039.36 31.37 9858 7790.00 7700.00 5537.45 S 1162.30 E 2068.83 28.97 9985 7890.00 7800.00 5614.00 S 1175.96 E 2095.51 26.68 10110 7990.00 7900.00 5688.04 S 1188.04 E 2120.53 25.02 10236 8090 O0 8000.00 5764.47 S 10364 8190.00 8100.00 584-2.64 S 1207.4~, E 2174.08 27.24 10492 8290.00 8'200.00 5922.34 S 12! 1 .39 E 2202.02 27.94 10618 8390.00 8300.00 5999.77 S 12'!5.63 E '2228.58 '26.55 10743 8490.00 8400.00 6074.60 S !221.61 E 2253.63 25..34 10865 85an O0 8500 00 6144 ~I S 1~28 84 ~ ~ ....... ~ .... 2075.85 ~2.~': 10986 8690.00 8600.00 6212.68 S t233.18 E ';£296.97 2t. I 11036 8730.60 8640.60 6240.13 S '1234.57 E 2305.40 THE CALCULAT'izON PROCEDURES USE A LIHEAR iH'TEF, POL/~T?OI"i B£T\,,/EEii THE NEAREST 20 . t.,,,,~T f'.,!D (FROi',4 HINI?',IUM CUR'v"ATURE.~ PC'INTS AOGCC GEOLOGICAL MATERIALS iNVENTORY LIST checl~ off ' · · ~ ,.,.,~.~. ,,,, u, ~,=,L ua~a us ;~ ;s rccc;vee."l;s; rece;veN (late tor 4Ur, if not re~.uircd list as NR I. 407 ! */o/~/~ j drilli.~ histo~- J ~ su~'ev ~ J well tests j~J core descr~ptio~ _cored inte~als core analysis j~j d~ ditch inte~als digital data i , ! , ' , , i ' '~' -,'~*,,- i RUN -v~ , , ~ ,,~,~,.~o SCALE .... , NO. [to thc nearest foot~ [inchll 3~ RI ~ / ' ' - ~o~ ...... 1 iii ._ i i ii, . i 13] i iii1.111 ii i i i ... ~1i i i i . , i i ii ii i.i i i i -' ' i iiiiii i i i i i ii i iiii iiii ii BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/08/92 T# 83687 BP CASED HOLE FINALS Enclosed is your copy of the materials listed questions, please contact BP Well Records at D-17 PROD-F G-31,~./~-/ GAS ENTRY SURVEY 5 " M-12 ~[~6~ INJ 06/29/92 M-14~O-~ INJ 06/24/92 M-26A ~$-~ PROD-F 06/28/92 Z-167~~- PRODUCTION LOG ~ 07/02/92 06/26/92 . #1 06/30/92 #1 #1 #1 #1 below. If you have any (907) 564-4004. 9900.00-10170.00 CAMCO 5 " #1 8960.00- 9200.00 CAMCO 9750.00-10180.00 CAMCO 5 " 10170.00-10720.00 CAMCO 5 " 10950.00-11754.00 C~CO 5 " 11150.00-11469.00 SCH 5 " Information Control Well Records Adrian J. Martin RECEIVED JUL ] 1992 Alaska Oil & 6as Cons. 6ommission Anchomge BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 05/06/92 T# 83486 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. CCL 01 CCL 04/26/92 #1 04/26/92 #1 05/02/92 #1 9900.00-10020.00 ATLAS 5 " 9900.00-10036.00 ATLAS 5 " 11160.00-11498.00 ATLAS 5 " Information Control Well Records Adrian J. Martin RECEIVED MAY 1 ~ 1992 Alaska Oil & Gas Oons. Gommissior~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/15/92 T# 83409 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ,.,.; X-16 / PRODUCTION LOG Z-16 ~'/ CCL 04/09/92 #1 04/05/92 #1 10350.00-10600.00 ATLAS 5 " 11150.00-11539.00 ATLAS 5 " Information Control Well Records Adrian J. Martin RECEIVED APR 2 4 1992. Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/08/92 T# 83381 BP CASED HOLE Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-26'~3-?? PFC A-04'/~'-~ CL A-01 ?/',27 PRODUCTION LOG ~S-32 ~o-;~ PRODUCTION LOG W-11~--'.~ COMPLETION W- 10 ~-~ ~ PERF H-06 ~-~ PRODUCTION LOG ccm D- 07 CCL 04/02/92 #1 04/04/92 #1 03/30/92 #1 04/04/92 #1 04/05/92 #1 04/04/92 #1 04/03/92 #1 04/02/92 #1 03/31/92 #1 03/29/92 #1 10390.00-11306.00 ATLAS 9300.00- 9600.00 ATLAS 8650.00- 9008.00 SCH 10200.00-10565.00 SCH 12470.00-13506.00 SCH 13490.00-14480.00 SCH 9400.00- 9774.00 SCH 8300.00-11573.00 SCH 12200.00-12320.00 ATLAS 12298.00-12303.00 ATLAS 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " Information Control Well Records Adrian J. Martin RECEIVED APR '1 5 1992 Alaska 011 & Gag Con~. Commission An(=horage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/17/92 T# 83333 BP MAGNETIC LIS TAPES Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at (907) Z-16 OH/BHC FIN 03/02/92 #1 8300.00-11700.00 1600BPI API#500292224500 8535->TP# Information Control Well Records Adrian J. Martin If you have any 564-4004. ATLAS REF#102139 RECEIVED MAR ;5 '1 1992. Alaska 0it & Gas Cons, Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 HOLE FINALS Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at DATE: 03/10/92 T# 83313 If you have any (907) 564-4004. H-08 ~-Z~ PERF F-40 ~/'/J~ PERF./--//7 N-12 ~/-/F PERF F-41~/-/~FPRODUCTION LOG E-10~/-/~ TDT-P .Z__-,,~6~'q~__CBT X-17~/~ PRODUCTION LOG 02/27/92 #1 02/28/92 #1 03/02/92 #1 02/26/92 #1 02/29/92 #1 03/04/92 #1 03/04/92 #1 Z-16 92.~*ULTRASONIC IMAGER 5 " 9100.00- 9432.00 SCH 5 " 9675.00-10654.00 SCH 5 " 9600.00- 9854.00 SCH 5 " 0.00-11561.00 SCH 5 " 11050.00-11727.00 SCH 5 " 7700.00-11514.00 SCH 5 " 9390.00- 9812.00 SCH 5 " 7700.00-11542.00 SCH 03/04/92~#1 Information Control Well Records Adrian J. Martin RECEIVED MAR 2 4 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East B~nson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/09/92 T# 83307 HOLE FINALS Enclosed is your copy of the materials listed questions, please contact BP Well Records at below. If you have any (907) 564-4004. Z-16 DIL 03/02/92 #1 Z-!6 BHC~ 03/02/92 #1 Z-16 CNL 03/02/92 #1 10900.00-11657.00 ATLAS 10900.00-11628.00 ATLAS 10900.00-11604.00 ATLAS 2/5" 2/5" 2/5" information Control Well Records Adrian J. Martin RECEIVED MAR 2 ~ 1992 Alaska Oil & Gas Con~. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/13/92 T# 83317 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~" D-08~,~Z/Z...,~¢, TUBING CUTTER '/ Z-16 ~'/'~' PFC ~'/W-40 ~-;~f COMPLETION ~/ W-38 ~-~r COMPLETION -/ D-24 ~3"~f~ COMPLETION 03/05/92 #1 03/06/92 #1 03/06/92 #1 03/09/92 #1 03/07/92 #1 8650.00- 8885.00 ATLAS 5 " 8300.00- 8650.00 ATLAS 5 " 9660.00-10301.00 SCH 5 " 13696.00-14720.00 SCH 5 " 10740.00-10840.00 SCH 5 " Information Control Well Records Adrian J. Martin RECEIVED MAR 2 4 1992 Alaska 011 & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION February 3, 1992 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501.3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Karen M Thomas PBU Sr Tech Asst BP Exploration P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Prudhoe Bay Unit Z-16 Company BP Exploration Permit # 92-12 Surf Loc 982'FNL, 1926'FWL, Sec 19, TllN, R12E, UM Btmhole Loc 2309'SNL, 1712'WEL, Sec 30, TllN, R12E, UM Dear Ms Thomas: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness, the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Ch airman Alaska C~iq--~nd Gas Co~servation Commission BY ORDER OF THE COMMISSION jo/encl c: Dept of Fish & Game, Habitat Section, w/o encl Dept of Environmental Conservation w/o encl TO: ~ypto, ~tion (Alaska) Inc. Box Al,,;horaOe Alaska 995t§-6~12 ARCO Alaska, Inc. RECEIVED TELECOPY Gas Cons. Commission Anchorage FROM: Name & Ext.: .~_.~-~-~ ~ ,-~,~---~ Department: NOTES: PAGES TO FOLLOW --- ................. (Do not include cover sheet) SECURITY CLASSIFICATION PRIVATE .... : ::.. i J. l t U_I_L_[. 'J[L ...... SECRET .. CONFIDENTIAL ' .;_...:.:z:._. ;, _:. . ._._ :.., t;..~...: __,,, -w~.._-:.._.::::.~ ;7 ......... .-T~:.--.:- -..-._ :. ..: : ::.;:~..~_ _J_.~_.,,. ,, ..,... SATELLITE FAX MACHINE r~^~ .................... CONFIRM# STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-Illb. Type of well.~'X'l~,~.i~'~l-! Stratigraphic Test I'-I Development O,,[] Re-Entry [] DeepenI-II Service [] Development Gas [] SingleZone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool KBE = 90'feet Prudhoe Bay Field/Prudhoe BP Exploration 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 47453 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 982'FNL, 1926' FWL, SEC. 19, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2127' FNL, 1749' WEL, SEC. 30, T11N, R 12E Z- 16 (32-30-11-12) 2S 100302630-277 At total depth 9. Approximate spud date Amount 2309' SNL, 1712' WEL, SEC. 30, T11N, R12E February 3, 1992 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD) p rope~L line 28262 @ 2309' f e e t Z- 17 @ 736'/32' f e e t 2560 1162 7'MD/9204'TVD~ e e t 16. To be completed for deviated wells 17. Anticipated pressure (s.e 20 AAC 25.035 (e)(2)) Kickoff depth 5oo~eet Maximum hole angle,~o. 63° Maximum surface 3330psig At total depth (TVD) 8800'/4390psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 13-1/2" 10-3/4" 45.5~ ~a~J-55 Butt 2970' Surface 3000' 2656' 2300 cuft Arcticset 111/460 c f "G' 9-7/8" 7-5/8" 29. 7# j NTgSHS NSCC 10676' Surface 10956' 8694' 1760 cu fl Class "G" 6-3/4" 5-1/2" 17#J '3C'~T8° FL4S 921' 10706' 8505' 11627' 9204' 200 cu fl Class "G" I 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production JAN 2 8 $992 Liner Perforation depth' measured Alaska 0il & Gas Cons. commisfe~ true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l'~l Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-1 21. I hereby certify,.t, hat the foregoing is true and correct to the best of my knowledge Signed ~c~'~_ .~-~.~~ Title PBU Senior TechnicalAssistant Date Commission Use Only ~ Permit Number IAPI number IApproval date ISee cover letter ,~. 2_/.% 150- ~,z?_. ~ '2 ~.. ,?_4' I ~ - ~"'¢2~ Ifor other requirements Conditions of approval Samples required [] Yes .~No Mud Icg required I'-IYes,.:E~l No Hydrogen sulfide measures [] Yes ~_ No Directional survey required ~ Yes [] No Required ~M; E]3M; J~5M; []1OM; I-I15M; Other:~ by order of Approved b~_.~_~ Commissioner [ne commission Date. .2,~' .~_~.'.z._. Submit 'iplicate PRELIMINARY WELL PLAN Well: Z-16 [32-30-11-12] PBU LOCATION: Surface: Target: T.D.: 982' SNL, 3352' WEL, Sec. 19, T11N, R12E 2127' SNL, 1749' WEL, Sec. 30, T11 N, R12E 2309' SNL, 1712' WEL, Sec. 30, T11N, R12E ESTIMATED START: Feb. 3, 1992 OPR. DAYS TO COMPLETE: 25 (20 days drilling, 5 days completion) CONTRACTOR: Nabors 28E MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 40.63o/ S 11.5° E /500'/2.5 Item TVDss MD(BKB) Mud Wt. 20" CONDUCTOR 10-3/4" SHOE BASE WEST SAK FORMATION 7-5/8" SHOE TOP SAG RIVER SANDSTONE CURRENT GOC TOP SADLEROCHIT TARGET TOTAL DEPTH 80 8.5 2551 2980 10.2 4875 6O42 9.5 8604 10956 10.5 8612 10966 10.5 8794 11206 9.3 8781 111 89 9.3 8897 11342 9.3 9114 11627 9.3 LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 9-7/8" Hole: None 6-3/4" Hole: DIL/BHCS/CNL-GR Cased Hole CBT/USIT and Gyro survey after rig release. SS: 1/23//92 RECEIVED JAN 2 8 1992 Alaska 0ii & Gas Cons. ijummis$ion Anchorage PR~'IMINARY WELL PLAi WELL Z-16 [32-30-11-12] PBU 20" Conductor PROPOSED DEPTH MD/BKB 110' Ball Valve 10-3/4" Casing 13-1/2" hole 2100' 2980' 3000' 4-1/2" 12.6# L-80 TDS tubing with GLM's 7-5/8" Packer 10656' 5-1/2" Tieback Assembly 10706' 7-5/8" Shoe 9-7/8" Open Hole 10956' 10966' 5-1/2" 17# 13 Cr-NT 80 FL4S Liner 6-3/4" PBTD 5-1/2" Liner Shoe 6-3/4" Open Hole 11565' 11625' 11627' SS 1/23/92 PROPOSED DRILLING AND COMPLETION PROGRAM WELL Z-16 [32-30-11-12] Install and cement 80' of 20" conductor to surface. PBU I The Drilling fluid program will consist of an 8.5 - 10.2 ppg spud mud in the 13- 1/2" hole, a 9.5 - 10.5 ppg water base mud in the 9-7/8" hole and a 9.3 ppg water based mud in the 6-3/4" hole. Drill 13-1/2" hole to 3000'. Run and cement 10-3/4", 45.5 #,'NT-80LHE Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. A formation leak-off test will be performed 10' below the 10-3/4" shoe. Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag River Sandstone. Run a 7-5/8" casing string of 29.7# NT-95HS NSCC to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected by dry crude. Directionally drill the 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to NaCI completion fluid. Test casing and lap to 3500 psi. Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated after the rig has been released. Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10- 3/4" annulus of the well. Tubing Size: 4-1/2", 12.6# L-80, TDS tubing with 5 GLM's. SS- 1/23//92 RECEIVED JAN 8 t99 Alaska 0il & Gas Cons. Anchorage MUD WEIGHT WELL Z-16 CALCULATIONS (32-30-11-12) Mud Wt. (6-3/4" Hole): 9.3 ppg. P Sag River: P Sadlerochit: P Top Sadlerochit: OB Sag River: OB Top Sadlerochit: Current GOC: 7-5/8" Casing Pt. Top Sag River Top Sadlerochit 3940 psi. 4010 psi 4010 psi. 223 psi. 234 psi. @ 8884' TVDBKB 8694' TVDBKB 87O2' TVDBKB 8871' TVDBKB Cement Calculations 10-3/4" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 7-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 5-1/2" LINER Measured Depth: Basis: Total Cement Vol: 2980' 2.5 X Annular volume 2760 (cuft) 2300 (cuft) 1185 Sx Arcticset III @ 1.94 Cu ft/Sk 460 (cu ft) 400 Sx class G + 2% CaCI2 cement @ 1.16 Cu ft/Sk 10956' 90% Annular Volume of 9-7/8" hole + 50 cuft 1760 (cuft) 1610 (cuft) 590 Sx G+2% D79 @ 2.75 Cu ft/Sk 150 (cuft) 130 Sx Neat G @ 1.15 Cu ft/Sk 10706' (Hanger)- 11627' (Shoe) 1.5 X Annular volume to 7-5/8" shoe + 100 cu ft 200 (cu ft) 172 Sx Neat G @ 1.16 Cu ft/Sk SS: 1/23/92 RECEIVED JAN 2 8 3992 Alaska 0il & Gas Cons. uommissio~ Anchorage $45DUA247:[DRAN033]Z16 CLOSAP SHORT.LIS;3 Search Radius= 200 COURSE LINE For proposed well: Z-16 [32-30-11-12] Location = W-E S-N TVD(SBS) Top 599649.00 5959099.00 -90.00 Bottom 601057.74 5952607.63 9000.00 Note: Ail depths in feet Below Kelly Bushing 23-JAN-1992 15:54 Closest Approach Analysis Date: 23-JAN-92 Time: 15:54:23 Page 1 Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPAR? A029-2184400 Z-14 A029-2184900 Z-15 A029-2185900 Z-20 A029-2197100 Z-iS A029-2!97700 5-12 A029-2200100 5-17 k029--2205300 R029-2206900 0 0 0 0 874 6 98 5 500 0 500 0 0 0 0 0 31 2 0 0 0 0 0 0 2.0 1 8 876 3 i00 0 502 3 738 7 5 O0 0 0 0 0 2 t~ ) CLOSEST DISTANCE 69 0 34 0 135 9 13 } 5 i~ 2 l! Vertical Intersection /PROPOSEDN, /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE S U 2!M A R Y -./ell which scme:z closes;:, be> ~he pi:0p:a~;ed :,.:eli. is: A029-2200!00 Z-i7 ( ClosesL approach distance = KICK OFF for this run = 32.2 feet 500.0 feet $45DUA247:[DRAN033]Z16 CLOSAP SHORT7.LIS;3 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: Z-16 [32-30-11-12] Location = W-E $-N TVD(SBS) Top 599649.00 5959099.00 -90.00 Bottom 601838.34 5952827.70 9000.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 23-JAN-1992 15:59 Closest Approach Analysis Date: 23-JAN-92 Time: 15:59:07 Page 1 Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2184400 Z-14 0 .0 A029-2184900 Z-15 0.0 A029-2!85900 Z-20 964 .~7 A029-2197!00 Z-t8 98.5 A029-2!97700 %-i 2 500 ~ O A629-- 2200 i 00 %-17 ~ '7'!.,j. A029. 2205 ;00 z--il ~ i98 ~< AO 2 {~--- 220690 O Z----I. 3 { 560 .0 0 0 0 0 ~8 ! 0 0 16 9 2.0 1 8 966 6 100 0 502 3 500 0 501. $ 0 0 0 0 2 5 0 2 4 CLOSEST DISTANCE 69 0 34 0 131 0 13 7 5 [03 9 Vertical Intersection /PROPOSEDN /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE ' i:'.e :/eli ';b.z 21k ,s:,:?mes s!oses t kc, the p~_-oposed well .i. s: A02g--2200iOO Z-!7 ', ,2!csest approach distance = KiCK CFF for- this run = 30.q fee~t 500.0 feet J HI~ NABOR$ '""'- z~c D:V~RTER SYSTEM ARCO ALASKA, INC. ~RECEI,VED JAN ~ 0 ]992 Alask~ 0il & Gas Cons. Commission Anchorage 10" ~ VALVE 10" BALL VALVE THE ~ VALVE WILL REMAIN CL~ U NI.E.~ CONI:XTtOHIB REQUIRE THE ~ OF THE SECOND VENT LINE. THE SECOND VENT UNE VALVE CAN lie ~ LIEING C:QN11:IOL~ LOCATED ATTHE ACCU~~T~ THIS IS 11419 15 A VAFIAN~E FROM f.,:.--:::.- ................ ,::,:..- ................ 1 ..... ALL TURI~ ARE TARG~ BOP STACK CONFIGURATION 1 ] 5/~"~ 5000 PSi WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER ... BLI ND RAMS ) ~ ' , 2" KILL LINE MANUAL HYDRAULIC 6ATE GATE (, · · , DRILLING SPOOL I I P! PE RAMS I, 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE t NORTH T. i~) N. T. II N. WELL Ne Z- 16 ii i SURFACE LOCATION LAT. · 70° 17' 51.657" LONG. · 149° I1' 34.875" A.S.P. Y · 5, 959 , 099.90 X = 599 , 649.82 ZONE 4 98:>, FROM N, LINE SECT. 19 19:~6' FROM W. LINE SECT. 19 23 T. II N. T. ION. RECEIVED JAN 2 8 992 Alaska Oil & Gas Cons. Commission Anchoraqe (~12 Z$-I 24 7 Ii - 12 SPINE ROA] SCALE PAD 27 32 II- 33 - II ~12 33 [ W. E.N.W. I ( MILES ) =fTW. 'C' CERTIFIC&TE OF SURVEYOR: I HEREBY CERTIFY THAT i AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THiS PLAT REPRESENTS A LOCATION SURVE~r' MADE BY ME OR UNDER lay ILmERYISION, MD ~AT &LL ~ENStONS AND OTHER D~ &R~ CORRECT. ~~~/ NOV. 2o,8~ SURVEYOR DATE ~ ~ Bemo~d Tomulich,:,~ '~ $. ~3798 $. SHEET I*OF 2 WELL PAD 'Z' WELL N° Z-16 AS-BUILT ii LOCATED IN PROTRACTED SECT. 19, T. II N.,, R. 12E., U.M. SURVEYED FOR : · TAkIIII~D ALASKA PRODUCTtO~',~ CO. PREPARED BY : ! DATE :NOV. 20,86 KUUKPIK - TECHNICAL SERV. INC. DRAWN eY= ~T. PRUDHOE BAY OFFICE CHKD. BY: R.H. CORN. OF SECT. 19 NORTH LINE OF SECTION 19 SUMP · · · · · · JL · · · · · · · · · · · · · · · · 1926' SUMP RECEIVED t NORTH Alaska Oil ~ b~ ~o~. Anchorage SHEET 2 OF 2 WELL. PAD 'Z' i _ WELL Ne Z-16 AS *JUILT LOCATED IN S~CT Il, T. I st., I. lEE., I,I,M. 9U R¥IryED POR : ST2U4~D ALASr~ PS~:~X.~TK~'~ CO. PRF. PARE~ BY , BATE KUUKPIK - TECHNICAL SERV. INC. ~AWN PR~D~[ ~Y OFfiCE CHKD. ~: R.H. ITO DISTRIBUTION TO.P__ TO FLARE CAVIEM UNIT 1 SHAKER SCREEN CAVlEM UNIT 2 TRIP TANK 170 BBL FILL LINE .SANO ...... TRAP 4 BBL CHOKE MANIFOLD CENTRIFUQi~ PIONEER MI< I TO PIT 131BBL VOLUME TANK 137 BBL EQ. DITCH 81BBL DEGASSING TANK DESILTER NABORS DEGA88ER DRILCO 8EEFLOW TO STAND PIPE & KILL LINE VOLUME TANK 180 BBL SUCTION 117 BBL MUD PUMPS WATER 87 BBL MUD HOPPERS & MIXING PUMPS SUCTK)N 134 BBL NABOR$ DRILLING LTD RIG NO. 28E MUD SYSTEM SURFACE FAClLITES TOTAL ACTIVE SYSTEM: 800 BBL TOTAL SURFACE CAPACITY : 970 BBL ITEM (1) Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE qAT~ ~ ~Bru 8~ ' . 3. 4. 5 6 7 (3) Admin [8] 9. [9 thru 13] 10. ~/-¥.~~/-.~,-.? ~ 11. [10 & 13] 12. 13. (4) Casg ~/.~.~-~'. /-~-~- 14. [14 thru 22] 15. (5) BOPE '~,~ ?- ~-.~ ~' [23 thru 28] (6) Other .~/C_ A//~'//~ ~_. [29 thru 3'1] Add] 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Lease & Well NO REMARKS Company Is permit fee attached ............................................... Is well to be located in a defined ~x)ol .............................. Is well located proper distance from property line ................... Is well located proper distance from other wells ..................... Is sufficient undedicated acrea§e aYa[-l'able in this I~ol ............. Is w~ll to be deviated & is wellbore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is aOministrative approval needed .................................... Is lease nunber appropriate ........................................... Does well have a unique name & nunber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~¢~-~psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. geol ogy: eng i nee r i rig' DWJ~ MTM ~ ZCS ~ R PC/~v~C~ BEW-7 RAD'~ JH I-~ ~ rev 03/29/91 jo/6.011 INITIAL GEOi UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks: ~-//~ ~ ~- ~/~'~, /, Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIx, No special 'effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN1 102139 CAIN TRACY LOVE OPEN HOLE Z - 16 500292224500 BP EXPLORATION (ALASKA) ATLAS WIRELINE SERVICES 11-MAR-92 RUN2 C. ZARNDT RUN3 19 liN 12E 982 ~-~ RECEIVED 86.84 85.84 MAR ;3 1 1992 54.09 Alaska Oil & Gas Cons. Commission Anchorage CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: CIRCULATION STOPPED AT 1930 HRS. 01-MAR-92 CN WAS DECENTRALIZED WITH BOWSPRING. BHC-AL USED 6.25" CENTRALIZERS. DIFL HAD 1.5" STANDOFFS. CHLORIDES WERE 7200 PPM. ?o.oooS,Z . o°' ---- FI tN E [ 6.750 NO UP-LOG REPEAT PASS LOGGED DUE TO TOOL STICKING. DOWN LOG WAS DEPTH SHIFTED TO MATCH UP LOG. UP LOG IS VALID DEPTH LOG. $ **** FILE HEADER **** FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 11000.0 2435 11000.0 STOP DEPTH 11670.5 11677.0 BCS 11000.0 DIL 11000.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH LL8 10999.0 10999.0 11017.5 11026.0 11027.0 11047.5 11048.5 11051.0 11052.0 11053.0 11056.0 11071.0 11074.5 11077.5 11078.5 11079.0 11079.0 11084.0 11084.5 11084.5 11099.0 11101.0 11134.0 11133.5 11136.0 11137.0 11137.5 11137.5 11138.0 11140.5 11146.0 11146.5 11152.0 11155.0 11159.5 11160.0 11160.5 11159.5 11166.0 11170.0 11173.0 11180.5 11185.0 11189.5 11190.0 11191.0 11196.0 11196.5 11197.0 11200.0 11204.0 11207.0 11210.0 11220.0 11223.5 11224.0 11224.5 11225.0 11233.0 11196.5 11629.0 11657.0 EQUIVALENT UNSHIFTED DEPTH ILM ILD NPHI 10999.0 10999.0 10999.0 11026.5 11050.0 11027.0 11050.0 11050.0 11053.5 11071.5 11075.0 11079.0 11079.0 11083.0 11101.0 11102.0 11136.5 11136.5 11138.0 11141.0 11146.5 11147.0 11152.0 11155.0 11160.0 11159.5 11165.5 11169.5 11180.5 11191.0 11196.0 11200.0 11207.0 11224.5 11160.0 11173.0 11184.5 11189.0 11196.5 11196.5 11203.5 11206.0 11208.5 11224.5 11220.5 11225.0 11234.0 DT 10999.0 11017.5 11079.0 11138.0 11189.0 11225.0 11234.0 11237.0 11237.5 11241.5 11246.0 11251.5 11274.5 11278.0 11298.5 11299.0 11300.0 11300.5 11304.0 11311.0 11312.0 11318.0 11318.5 11335.0 11344.5 11351.5 11354.0 11375.5 11417.5 11427.5 11436.5 11438.5 11448.0 11463.5 11465.0 11473.0 11476.0 11476.5 11483.0 11483.5 11490.0 11494.5 11497.5 11498.0 11520.5 11522.0 11528.0 11536.5 11543.5 11544.0 11547.0 11560.0 11562.5 11574.5 11617.5 11619.5 11622.0 11640.0 11641.5 $ MERGED DATA SOURCE PBU TOOL CODE GR 2435 BCS 11234.0 11237.5 11241.0 11300.5 11312.0 11318.5 11492.0 11545.0 RUN NO. 1 1 1 11246.0 11278.0 11300.0 11312.0 11318.5 11336.0 11352.5 11438.5 11451.0 11466.5 11477.5 11499.0 11522.0 11530.5 11546.0 11562.0 11619.5 11623.5 11641.5 PASS NO. 2 2 2 11234.0 11237.0 11251.0 11278.0 11300.0 11353.5 11439.0 11477.5 11484.5 11498.0 11300.0 11304.5 11318.5 11462.0 11472.0 11482.0 11522.0 11528.0 11535.0 11547.0 11562.0 11574.5 11619.0 11641.5 MERGE TOP 11000.0 11000.0 11000.0 11237.0 11275.0 11346.5 11377.0 11417.5 11428.0 11496.5 MERGE BASE 11670.5 11677.0 11629.0 DIL $ REMARKS: CN WN FN COUN STAT 1 2 11000.0 TENS AND TEND SHIFTED WITH LL8. SP SHIFTED WITH ILD. FUCT AND NUCT SHIFTED WITH NPHI. DATA BEGINS AT LOGGERS CASING DEPTH. $ : BP EXPLORATION (ALASKA) : Z - 16 : PRUDHOE BAY : NORTH SLOPE : ALASKA 11657.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 DT BCS 68 1 2 GR BCS 68 1 3 ILD DIL 68 1 4 ILM DIL 68 1 5 LL8 DIL 68 1 6 SP DIL 68 1 7 MTEM 2435 68 1 8 NPHI 2435 68 1 9 NUCT 2435 68 1 10 FUCT 2435 68 1 11 TEND 2435 68 1 12 TENS 2435 68 1 US/F 4 GAPI 4 OHMM 4 OHMM 4 OHMM 4 MV 4 DEGF 4 PU-S 4 CPS 4 CPS 4 LB 4 LB 4 4 85 618 83 5 4 67 465 06 6 4 93 412 48 5 4 94 723 20 5 4 39 005 82 1 4 58 070 90 6 4 18 487 70 6 4 52 326 75 5 4 83 368 34 1 4 84 023 70 1 4 19 912 29 5 4 19 912 29 5 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 79 Tape File Start Depth = 11743.000000 Tape File End Depth = 10999.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet 48 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19358 datums Tape Subfile: 2 269 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8315.0 11000.0 2435 8315.0 11000.0 BCS 8315.0 11000.0 $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH NPHI 8092.0 8092.0 8317.0 8316.5 8570.5 8572.5 9219.5 9220.0 9433.5 9433.5 9699.0 9700.0 9737.0 9736.5 9921.0 9922.0 10153.0 10152.5 10173.5 10172.0 10197.0 10197.5 10588.0 10587.5 10591.0 10591.0 10615.0 10614.0 10760.5 10760.5 10876.5 10876.0 10887.0 10887.0 11001.0 11001.0 $ REMARKS: CN WN FN COUN STAT EQUIVALENT UNSHIFTED DEPTH ALL CURVES SHIFTED WITH NPHI. CN-CASING PASS SPLICED TO TOP OF MAIN PASS RUN UP INTO CASING. SPLICE DEPTHS: GR ..... 10906.5 NPHI (FUCT, NUCT) ..... 10912.5 TENS-TEND ..... 10966.0 DT ..... 10939.0 MTEM ..... 10897.0 DATA STOPS AT LOGGERS CASING DEPTH. $ : BP EXPLORATION (ALASKA) : Z - 16 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 DT BCS 68 1 2 GRCH BCS 68 1 3 MTEM 2435 68 1 4 NPHI 2435 68 1 5 FUCT 2435 68 1 6 NUCT 2435 68 1 7 TEND 2435 68 1 8 TENS 2435 68 1 US/F GAPI DEGF PU-S CPS CPS LB LB 4 4 85 618 83 5 4 4 67 465 06 6 4 4 18 487 70 6 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 4 4 19 912 29 5 4 4 19 912 29 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 208 Tape File Start Depth = 11001.000000 Tape File End Depth = 8092.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet 32 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 52372 datums Tape Subfile: 3 261 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 2 0.2500 VENDOR TOOL CODE START DEPTH GR 10900.0 2435 10900.0 AC 10935.0 DIFL 10955.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 11675.0 11680.0 11630.0 11680.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR BHC/ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 02-MAR-92 FSYS 256 REV G002 VER2.0 1930 01-MAR-92 225 02-MAR-92 11669.0 11662.0 10900.0 11657.0 1800.0 TOOL NUMBER 3974 3967 2806 1309 2435 3506 1603 1503 6.750 11012.0 11000.0 XCD POLYMER 9.60 51.0 9.0 6.0 205.0 MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN (LOG UP) PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Z - 16 : PRUDHOE BAY : NORTH SLOPE : ALASKA 0.508 73.0 0.188 205.0 0.451 73.0 0.000 0.0 0.474 73.0 0.000 0.0 THERMAL 0.00 7.875 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units 1 AC AC 68 1 2 ACQ AC 68 1 3 GR AC 68 1 4 CN 2435 68 1 5 CNC 2435 68 1 6 CSSN 2435 68 1 7 CLSN 2435 68 1 8 CHT 2435 68 1 9 SPD 2435 68 1 10 TEMP 2435 68 1 11 TTEN 2435 68 1 12 RFOC DIFL 68 1 13 RILD DIFL 68 1 14 RILM DIFL 68 1 15 SP DIFL 68 1 16 CILD DIFL 68 1 17 VILD DIFL 68 1 18 VILM DIFL 68 1 US/F GAPI PU-L PU-S CPS CPS LB F/MN DEGF LB OHMM OHMM OHMM MMHO API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 48 852 89 1 4 4 81 285 47 0 4 4 95 473 00 0 4 4 52 326 75 5 4 4 98 211 23 1 4 4 83 368 34 1 4 4 08 501 10 0 4 4 19 912 29 5 4 4 54 376 29 5 4 4 18 487 70 6 4 4 19 912 29 5 4 4 27 515 24 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 53 419 67 0 4 4 34 704 23 6 4 4 04 522 10 6 4 4 04 522 10 6 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 261 Tape File Start Depth = 11743.000000 Tape File End Depth = 10895.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 72 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 83826 datums Tape Subfile: 4 339 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 5 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 1 0.2500 VENDOR TOOL CODE START DEPTH GR 11030.0 2435 11030.0 AC 11060.0 DIFL 11090.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 11680.0 11685.0 11650.0 11670.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR BHC/ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): 02-MAR-92 FSYS 256 REV G002 VER 2.0 1930 01-MAR-92 302 02-MAR-92 11669.0 11662.0 10900.0 11604.0 1800.0 TOOL NUMBER 3974 3967 2806 1309 2435 3506 1603 1503 6.750 11012.0 11000.0 XCD POLYMER 9.60 51.0 9.0 6.0 205.0 0.508 0. 188 73.0 205.0 MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT (LOG DOWN) PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Z - 16 : PRUDHOE BAY : NORTH SLOPE : ALASKA 0.451 73.0 0.000 0.0 0.474 73.0 0.000 0.0 THERMAL 0.00 7.875 1.5 * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 AC AC 68 1 2 ACQ AC 68 1 3 GR AC 68 1 4 CN 2435 68 1 5 CNC 2435 68 1 6 CSSN 2435 68 1 7 CLSN 2435 68 1 8 CHT 2435 68 1 9 SPD 2435 68 1 10 TEMP 2435 68 1 11 TTEN 2435 68 1 12 RFOC DIFL 68 1 13 RILD DIFL 68 1 14 RILM DIFL 68 1 15 SP DIFL 68 1 16 CILD DIFL 68 1 17 VILD DIFL 68 1 18 VILM DIFL 68 1 US/F GAPI PU-L PU-S CPS CPS LB F/MN DEGF LB OHMM OHMM OHMM MMHO 4 4 48 852 89 1 4 4 81 285 47 0 4 4 95 473 00 0 4 4 52 326 75 5 4 4 98 211 23 1 4 4 83 368 34 1 4 4 08 501 10 0 4 4 19 912 29 5 4 4 54 376 29 5 4 4 18 487 70 6 4 4 19 912 29 5 4 4 27 515 24 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 53 419 67 0 4 4 34 704 23 6 4 4 04 522 10 6 4 4 04 522 10 6 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 215 Tape File Start Depth = 11711.000000 Tape File End Depth = 11015.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 72 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 105288 datums Tape Subfile: 5 Minimum record length: Maximum record length: 291 records... 62 bytes 994 bytes Tape Subfile 6 is type: LIS **** FILE HEADER **** FILE HEADER FILE NUMBER: 5 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8298.0 2435 8298.0 AC 8300.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 10980.0 10980.0 10980.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMARAY COMPENSATED NEUTRON PULSE CODE MODULATOR BHC/ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 02-MAR-92 FSYS 256 REV G002 VER 2.0 1930 01-MAR-92 302 02-MAR-92 11669.0 11662.0 10900.0 11604.0 1800.0 TOOL NUMBER 3974 3967 2806 1309 2435 3506 1603 1503 6.750 11012.0 11000.0 XCD POLYMER 9.60 51.0 9.0 6.0 205.0 0.508 0.188 0.451 0.000 0.474 0.000 73.0 205.0 73.0 0.0 73.0 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN-CASING PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Z - 16 : PRUDHOE BAY : NORTH SLOPE : ALASKA THERMAL 0.00 7.875 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units 1 AC AC 68 1 2 ACQ AC 68 1 3 GR AC 68 1 4 CN 2435 68 1 5 CNC 2435 68 1 6 SSN 2435 68 1 7 LSN 2435 68 1 8 CHT 2435 68 1 9 SPD 2435 68 1 10 TEMP 2435 68 1 11 TTEN 2435 68 1 12 RFOC DIFL 68 1 13 RILD DIFL 68 1 14 RILM DIFL 68 1 15 SP DIFL 68 1 16 CILD DIFL 68 1 17 VILD DIFL 68 1 18 VILM DIFL 68 1 API API API API Log Crv Crv Size Length Typ Typ Cls Mod US/F 4 4 GAPI 4 PU-L 4 PU-S 4 CPS 4 CPS 4 LB 4 F/MN 4 DEGF 4 LB 4 OHMM 4 OHMM 4 OHMM 4 MV 4 MMHO 4 MV 4 MV 4 4 48 852 89 1 4 81 285 47 0 4 95 473 00 0 4 52 326 75 5 4 98 211 23 1 4 83 368 34 1 4 08 501 10 0 4 19 912 29 5 4 54 376 29 5 4 18 487 70 6 4 19 912 29 5 4 27 515 24 6 4 04 903 06 0 4 06 213 78 0 4 53 419 67 0 4 34 704 23 6 4 04 522 10 6 4 04 522 10 6 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 889 Tape File Start Depth = 10980.000000 Tape File End Depth = 8092.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet 72 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 303334 datums Tape Subfile: 6 961 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 7 is type: LIS **** TAPE TRAILER **** 92/ 3/12 01 **** REEL TRAILER **** 92/ 3/13 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 13 MAR 92 4:06p Elapsed execution time = 1 minute , 41.2 seconds. SYSTEM RETURN CODE = 0