HomeMy WebLinkAbout192-012Page 1 of 2
Schwartz, Guy L (DOA)
From: Schwartz, Guy L (DOA)
Sent: Monday, June 28, 2010 8:18 AM
To: 'Phillips, Ron'
Subject: RE: Z-16A report (PTD 192-012)
Ron,
Thanks for tracking that down. Good work.
Guy Schwartz
Senior Petroleum Engineer
AOGCC
793-1226 (office)
444-3433 (cell)
From: Phillips, Ron [mailto:Ron.Phillips@bp.com]
Sent: Tuesday, June 22, 2010 9:19 AM
To: Schwartz, Guy L (DOA)
Subject: RE: Z-16A report (PTD 192-012) ~; .+~,~~~f.~ ~~ `_ er ~ ~~~~ yr:
Guy Schwartz,
Sorry it took a little time to find the correct person that was on tower 3/28/10.
The Nordic 2 tourpusher said, "The problem was a failing 3" shock hose on the kill side. We had found some
rubber at the shaker and after inspection of the 3" shock hose, it was determined to be shedding internally. We
then rigged down the 3" flexible kill hose and replaced it with 3" hardline with Graylock clamps. At no time have
we ever used threaded 1502 type connections in either our choke or kill lines."
The Nordic 2 WSL amended the openwells report to reflect that the hardline had graylock connections.
If you need more information please call or email.
Thanks,
Ron Phillips
Coil Tubing Drilling Engineer
Alaska Drilling & Wells
Office (907) 564-5913
From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov]
Sent: Friday, June 04, 2010 9:35 AM
6/28/2010
Page 2 of 2
To: Phillips, Ron
Cc: Regg, James B (DOA)
Subject: Z-16A report (PTD 192-012)
Ron,
As I was reading the drilling report for Z-16 I noticed on 3/28/10 on the initial BOP rigup that the shell test had
mentioned a failed PT on the Kill line. It appears that it was replaced with a new section but that also failed.
Finally "hardline" was installed and passed a pressure test. This happened before the official witnessed BOP
test. Can you elaborate on the type of pipe used ... was it knock-up 1502 type connections? Regulations require
the kill line to be rigid pipe without hammer unions (20 AAC 25.285 (e) There is no mention of this in our BOP
report submitted by the inspector.
Thanks in advance,
Guy Schwartz
Senior Petroleum Engineer
AOGCC
793-1226 (ofFce)
444-3433 (cell)
6/28/2010
PJQ. 5378
Alaska Data. & Consulting Services
2525 Gambell Street, Suite 400 Company: State of Alaska
Anchorage, AK 99503-2838 Alaska Oil & GaS Cons Comm
ATTtd: Beth Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description
Date AI r..i,,. .~.,
•
1
C~
Petrotechnical Data Center LR2-1 Alaska Data & Consulting Services
900 E. Benson Blvd. 2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 14, 2009
'ja?~ ~~~~~~ ' ~~41~1 ~~ i ~ ~~~i~
~~
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB Z-Pad
Dear Mr. Maunder,
~
bp
~~~iG~~~GA~
OCT ~ 5 2009
~IasNc~ ~il F~ Gas Cons. Con~ura~or~
Anch~raq~
~ a,-- a 12-
~ ~~b
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that coufd result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
Z-Pad
8/13/2009
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009
Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009
Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009
Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009
Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009
Z-O6 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009
Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009
Z-OSA 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009
Z-O9A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009
Z-1o 1891160 50029219860000 NA ].3 NA 11.10 7/24/2009
Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009
Z-12 1891020 50029219770000 NA 12 NA 8.50 7/26/2009
Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009
Z-14B 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009
Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009
Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009
Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009
Z-18 1890960 500292197t0000 NA 0.2 NA 1.70 7/26/2009
Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009
Z-20 1881000 50029218530000 NA 0.2 NA 1.70 7/26/2009
Z-21A 2001010 50029219380100 NA 02 NA 1.70 7/23/2009
Z-226 1960350 50029220370200 NA 0.5 NA 5.t0 7/23/2009
Z-238 2041080 5~29219500200 NA 0.3 NA 1.70 7/23/2009
Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009
Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009
Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009
Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009
Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009
Z-29 1890650 50029219540W0 NA 0.2 NA 1.70 7/25/2009
Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009
Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009
Z-32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009
Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009
Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009
Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009
Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009
Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009
Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009
Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009
Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009
Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2d09
Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009
Z-i12 2071720 5002923380000o NA surface NA
'~
~~~~~~~~~~~~
N0. 5310
~laska Data & ~onsuking Services .y ~~;~ ~~~~~~~~, ~} ~ ;u =:; ;1(~`~ ~ Company: State of Alaska
2525 Gambeu Streec, Suite 400 `~ Alaska Oil & Gas Cons Comm
Alnchorage, AK 99503-?_838 Attn: Christine Mahnk~~n
F~TTN: Beth 333 West 7th Ave, Suite~ 100
Anchorage, AK 99501
~1/~11 Job # Log Description Date BL Color CD
07/14/09
~-20 AP3~-00043 SBHP SURVEY - 06/17/09 1 1
P2-31 AZCM-00029 LDL L~ d 06/17/09 1 1
12-03 AY1M-00022 SBHP SURVEY O6/15/09 1 1
Z-14~ AYQ~-00036 TEMP SURVEY & BHP . O6/23/09 1 1
RI-16 AP3Q-00042 SBHP SURVEY 6 ~ 06/16/09 1 1
V~45 .;,. 11999053 USIT - 10/12/08 1 1
' N-11C
'
AP3Q-00042
SBHP SURVEY
06/16/09
1
1
"` T3=12 AY3J-00030 LDL ~ 06/12/09 1 1
L1-30 AVY5-00049 PRODUCTION PROFILE -nj b~ O6/22/09 1 1
17-078 AY~Q-00031 SBHP SURVEY "~ C5 06/11/09 1 1
OS-258 AP3Q-00040 SBHP SURVEY - 06/11l09 1 1
B-27A AXBD-00028 MEM INJ PROFILE 06/12/09 1 1
11-36 6146-00066 CROSSFLOW & IBP ~- O6/23/09 1 1
Z-21Da 8148-00065 SBHP SURVEY OW21/09 1 1
X-17 AYTU-00043 PROD PROFILE -/ 06/08/09 1 1
~-25 AWL8-00018 LDL J'~°~ ~'~j - 05/28/09 1 1
02-33B AYTU-00033 USIT ~ ~ 05/19/09 1 1
P2-07 AVY5-00051 PRODUCTION PROFILE ~ J 06/25/09 1 1
13-03 AWLB-00020 LDL 06/01/09 1 1
3-17F/K30 B2NJ-00008 MEM INJ PROFILE (J 06/15/09 1 1
MPS-08 AYS4-00080 LDL O6/15/09 1 1
13-92 AV1H-00019 LDL 07/05/09 1 1
Oi-25 AYTU-00046 USIT - ~~ 06l28/09 1 1
UU-39A AWL8-00023 STATIC TEMP SURVEY ~ ~ 06/26/09 1 1
~-35 AYTO-00022 SBHP SURVEY - f O6/29/09 1 1
Z-16 AV1H-00017 SBHPSURVEY ~ .. 06/29/09 1 1
18-20 B581•00004 LDL .- ~ ;_ ~ O6/27/09 1 1
Z-29 AVYS-00053 SBHP SURVEY a~ •~ (~(~~~' ~•'" _- ~ 07l03/09 1 1
L5-09 AY~Q-00032 RST ~. (~ O6/13/09 1 1
07-10A BiJJ-00022 MCNL -~ dI 05/26/09 1
'__"_""_"'__~_.........~.. . .~. .....,...........v~.`.~v.u.u~aav~~~vvr~ cr~a.n ~v.
BP Expioration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Bivd.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
s
•
~
• •
7 ~ ~~ -} ~ ~
,1~.
n
ALASSA OIL A1~TD GA5
CO1~T5ER'VATIOI~T COl-II~II55IO1~T
John McMullen
Engineering Team Leader
BP Exploration Alaska Inc.
PO Box 196612
An h
~~L~~ ~CAi~ ~_ ~ ~'~a
c orage AK 99519-6612 - ~ 1
~ `~
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-16
Sundry Number: 309-104
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Coxninission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
DATED this Zg day of March, 2009
SARAH PAL/N, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Encl.
t -- - ~~~~
v' ,~ STATE OF ALASKA ~ ~~~*~3/9 G~
. 1j'~~ ALA OtL AND GAS CONSERVATION COMMISSION
~~ '~~ APPLICATION FOR SUNDRY APPROVA ''I ~'~~~ ~ `~~?~~
~\~ t5
20 AAC 25.280 lalactra ftil R Cap i:r~n~. Ct3td~l~?1S${I~s~
1. Type of Request: ®Abandon - ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Exten~O~Ora~e
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. - ®Development ^ Exploratory 192-012
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22245-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU Z-16 -
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028262 &047453- 87.39' - Prudhoe Bay Field / Prudhoe Bay Oil Pool
12• PRESENT WELL CONDITION SUM MARY`
Total Depth MD (tt): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11669' - 9214' - 11582' 9143' 11409' None
i TV
I
1 ~~
2 9 ' - /4" 2 '
Int i 11 1 7-/" 1 12' 7' 1
Pr
Liner -1/ " 107 ' - 11 4' 4 ' - 9 774
Perforation Depth MD (ft): Perforation Depth TVD (tt): Tubing Size: Tubing Grade: Tubing MD (tt):
11256' - 11430' 8876' - 9018' 4-1/2", 12.6# L-80 10738'
Packers and SSSV Type: (2) 7-5/8" x 4-1/2" Baker'SAB-3' packers Packers and SSSV MD (ft): 8396' & 10653'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch _
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: September 1, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned
17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 56a-x387
Printed Name Joh Mc ullen Title En ineerin Team Leader
Prepared By Neme/Number
Signature Phone 564-4711 DatQ, (~ ~ Terris Hubble, 564-4628
` Commission Use Onl
Sundry Number: .!
Conditions of approval: Notify Commission so that a representative may witness
, a
^ Plug Integrity BOP Test ^ Mechanical Integrity Test ^ Location Clearance
~
other: 3~p~ S ~ 1;-c3.r-~~S°~ ~ c~-~ ~ P S ~ ~oc~+t~~~~-~ ~~ ~.. ~', z-
P
Subsequent Form R wired: ~---~
APPROVED BY
e
A roved B . COMMISSIONER THE COMMISSION Dat
Form 10-403 Rbv'kr efi 06/20060
..~
Submit In Duplicate
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Sean Mclaughlin
CTD Engineer
Date: March, 16, 2009
Re: Z-16 Sundry Approval
•
by
Sundry approval is requested for well Z-16. Z-16 is a conventional waterflood well drilled in 1992.
This well has suffered from abnormally low gross fluid rate and low PI even after acidizing and
reperforating. This well is no longer competitive for the limited gas lift in the area. After being shut in
from 2006 to 2008 it has seen minimal on time recently.
REASON FOR SIDETRACK
Given the low fluid rates and high water cut Z-16 is a good candidate for a coil sidetrack.
The proposed plan for Z-16A is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled
Tubing Drilling rig on or around October 1, 2009. The existing perforations will be isolated by a
cement downsqueeze after setting the whipstock, as well as the primary cement job. The sidetrack, Z-
16A, will exit the existing 5-1/2" liner and kick off in Shublik and drill an S shape well in Zone 4. The
following describes work planned and is submitted as an attachment to Form 10-403. A schematic
diagram of the proposed sidetrack is attached for reference. I cv~ ~~., ~ ~,~ ~~goos~ s~~r-wtk
~,- ~'r l ~~ get r~ r ~~ ~`~~ 9~
Pre-Rig Work: (scheduled to begin September 1, 2009) %~ P~ifr.:~,~ "~+~//6"~r ~"'°~ Slav/9'
1. S Dummy WS drift to 11150' ,~rU~ • ~t
2. S Dummy GLV's ~~~d,,«~
3. O MIT-IA
"
"
' F
f~
4. E Set 4-1/2
x 5-1/2
TTWS at 11085
te
5. C Mill XN nipple at 10726' with LH motor
6. C Down squeeze cement for P&A - 18 bbls of 15.8 ppg unislurry
7. O AC-LDS; AC-PPPOT-T
8. O PT MV, SV, WV
9. O Bleed gas lift and production flowlines down to zero and blind flange
10. O Remove wellhouse, level pad
Rig Work: (scheduled to begin on October 1, 2009)
1. MIRU and test BOPE to 250 nsi low and 3500 ns
~ve7i0r ro'~ Q'~ (/l~rhQ.j~
Fro., Thf ~t~A~ dR ~~C
~~g~g
~~~ v~cj~\1__--
2. Mi113.8" window at 11,085' and 10' of rathole. Swap the well to Flo-Pro.
3. Drill Build: 4.125" OH, 470' (28 deg/100 planned)
4. Drill Lateral: 4.125" OH, 750' (12 deg/100 planned) with resistivity
5. Run 3-3/16" L-80 x 2-7/8" chrome liner leaving TOL at 10,680'
6. Pump primary cement leaving TOC at 10800', 18 bbls of 15.8 ppg liner cmt planned
7. Cleanout liner and MCNL/GR/CCL log
8. Test liner lap to 2000 psi.
9. Perforate liner per asset instructions 0500')
10. Freeze protect well, RDMO
Post-Rig Work: •
1. Re-install wellhouse and FL's.
2. Generic GLV's
Sean McLaughlin
CTD Engineer
564-4387
CC: Well File
Sondra Stewman/Terrie Hubble
TREE _ , CNV
WELLHEAD = FMC
ACTUATOR = BAKER
KB. ELEV = 87.04'
BF. ELEV = 54.01'
KOP = 990'
Max Angle = 44 @ 9090'
'Datum MD = 11270'
Datum TV D = 8800' SS
~-~ ~ S OTES:5-1/2"CHROME LNR
2105' 4-1/2" OTIS SSSV NIP, ID= 3.813"
10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 2993'
Minimum ID = 3.725" @ 10726'
4-1/2" PARKER SWN NIPPLE
1 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10738'
TOP OF 5-1/2" LNR 10739'
7-5/8" CSG, 29.7#, ID = 6.875" 11012'
PERFORATION SUMMARY
REF LOG: CBL ON 03/04/92
ANGLE AT TOP PERF: 35 @ 11256'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 11256 - 11300 O 04/05/92
3-3/8" 6 11320 - 11340 O 05/03/92
3-3/8" 6 11350 - 11390 O 05/03/92
3-3l8" 6 11400 - 11430 O 05/03/92
PBTD ~1
5-1/2" LNR, 17#, 13-CR .0232 bpf, ID = 4.892"
GAS LIFT MANDR~S
ST MD TVD DEV TYPE VLV LATCH PORT DATE
3 3587 2982 41 CAM BK
2 7077 5587 42 CAM BK
1 8361 6750 39 CAM BK
8387' ~ -- ~4-1/2" PARKER SWS NIP, ID = 3.813"
8396' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875"
10621' 4-1/2" PARKER SWS NIP, ID = 3.813"
10632' BAKER PBR RECEPTACLE
10653' 7-518" X 4-1/2" BKR SAB-3 PKR, ID = 3.875"
10726' 4-1/2" PARKER SWN NIP, ID = 3.725"
10738' 4-1/2" WLEG, ID= 3.958"
10724' ELMD TT LOGGED 04/02/92
11409' ~-~ TOP OF SAND
DATE REV BY COMMENTS DATE REV BY COMMENTS
03/15/92 SALEH ORDINAL COMPLETION
03/09/01 SIS-QAA CONVERTED TO CANVAS
03/13/01 SIS-MD FINAL
06/19/01 RN/TP CORRECTIONS
PRUDHOE BAY UNfT
WELL: Z-16
PERMfT No: 1920120
API No: 50-029-22245-00
SEC 19, T11 N, R12E, 982' FNL 8~ 1926' FWL
BP Exploration (Alaska)
TREE _
PERFORATION SUMMARY
REF LOG: CBL ON 03/04/92
ANGLE AT TOP PERF: 35 ~ 11256'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 11256 - 11300 isolated proposed
3-3/8" 6 11320 - 11340 isolated proposed
3-3/8" 6 11350 - 11390 isolated proposed
3-3/8" 6 11400 - 11430 isolated proposed
U
5-1/2" LNR, 17#, 13-CR, .0232 bpf, ID = 4.892" ~ ~
13-3/16 L80 x 2-7/8 Cr X-over
3-3/16" L80 X 2-7/8" Cr cmt'ed and
11085' Mechanical Whipstock
11409' TOP OF SAND
DATE REV BY COMMENTS DATE REV BY COMMEMS
03/15/92 SALEH ORIGINAL COMPLETION
03/09/01 SIS-QAA CONVERTEDTOCANVAS
03/13/01 SIS-MD FINAL
06/19/01 RNITP CORRECTIONS
02/04/09 MSE PROPOSED CTD SIDETRACK
12305'
PRUDHOE BAY UNIT
WELL: Z-16A
PERMIT No:
API No: 50-029-22245-01
SEC 19, T11 N, R12E, 982' FNL 8 1926' FWL
BP Exploration (Alaska)
~~
~ Z-16A [
Proposed CTD Sidetrack
WELLHEAD= FMC
ACTUATOR= BAKER
KB. ELEV = 87.04'
BF. ELEV = 54.01'
KOP = 990'
Max Angle = 44 @ 9090'
Datum MD = 11270'
Datum TV D = ~
8800' SS
•
10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~~ 2993'
5-1 /2" CHROME LNR
14-1 /2" OTIS SSSV NIP, ID = 3.813" ~
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
3 3587 2982 41 CAM BK
2 7077 5587 42 CAM BK
1 8361 6750 39 CAM BK
Minimum ID = '
8387 4-1/2" PARKER SWS NIP, ID = 3.813"
8396' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875"
(milled to 3.8")
10621'
4-1/2" PARKER SWS NIP, ID = 3.813"
10632' BAKER PBR RECEPTACLE
10653' 7-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875"
TOP OF LNR 10680' 10726' 4-1/2" PARKER SWN NIP, ID= 3.800"
,'milled to 3 8")
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID= 3.958" 10738'
10738' 4-1 /2" WLEG, ID = 3.958"
TOP OF 5-1/2" LNR 10739'
Top of Cement 10800' 10724' ELMD TT LOGGED 04/02/92
7-5/8" CSG, 29.7#, ID = 6.875" 11012'
STATE OF ALASKA ~ 'S~~ ~~' .
ALA OIL AND GAS CONSERVATION COMMON ~~~ '~~`
REPORT OF SUNDRY WELL OPERATION~~~~~~ ~ ° ~ ~1?,{7c
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ r r `
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension °" n~ r~
v~?'
l
,~~+ J
;~''~y~
Change Approved Program ~ Operat. Shutdown Perforate 0. Re-enter Suspended Wel
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development C~' - Exploratory 192-0120 -
3. Address: P.O. Box 196612 Stratigraphic ~'' ServiCe 6. API Number:
Anchorage, AK 99519-6612 50-029-22245-00-00
7. KB Elevation (ft): 9. Well Name and Number:
87.39 KB - PBU Z-16 "
8. Property Designation: 10. Field/Pool(s):
ADLO-047453 - PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 11669 - feet Plugs (measured) 11409'
true vertical 9213.82 ~ feet
sur
d) None
Junk (me
a
e
**~~ jj
r
g
{
~
~~9ti~ JUL ~ t 2iJ~
Effective Depth measured 11582 feet
true vertical 9142.55 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 33 - 113 33 - 113 1490 470
Surface 2961 10-3/4" 45.5# NT-80L 32 - 2993 32 - 2622 5210 2480
Production 10982 7-5/8" 29.7# NT-95 30 - 11012 30 - 8676 8180 5120
Liner 925 5-1/2" 17# 13CR80 10739 - 11664 8455 - 9210 7740 6280
Perforation depth: Measured depth: See Attached - _ _ _ _
True Vertical depth: _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 28 - 10738
0 0 -
Packers and SSSV (type and measured depth) 4-1/2" Baker SABL-3 Packer 8396
4-1 /2" Baker SABL-3 Packer 10653
5-1/2" Baker LT Packer 10739
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured): l
~iV(~~~ \b.S~ ~t't~~~1CC
Treatment descriptions including volumes used and final pressure: ~~' 1~6~ ~`l~ ~'L~-/
) ,- • 1
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: Shut-in
Subsequent to operation: Shut-in
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development Service f~'
Daily Report of Well Operations X 16. Well Status after proposed work:
OiI Gas WAG ' GINJ WINJ ~'' WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preb Title Data Management Engineer
Signature Phone 564-4944 Date 7/14/2008
Form 10-404 ised 04/200 ~ ~ ~ ~ (~ ~ ~ ~' ~~~ ~ ~ ~~~~ Submit Original Only
Z-16
192-0120
PERF ATTACHMENT
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
Z-16 4/5/92 PER 11,254. 11,276. 8,874.21 8,892.2
Z-16 4/5/92 PER 11,276. 11,300. 8,892.2 8,911.82
Z-16 5/2/92 APF 11,320. 11,340. 8,928.17 8,944.52
Z-16 5/2/92 APF 11,350. 11,390. 8,952.69 8,985.4
Z-16 5/2/92 APF 11,400. 11,430. 8,993.58 9,018.13
Z-16 7/3/08 APF 11,350. 11,370. 8,952.69 8,969.05
Z-16 7/3/08 APF 11,370. 11,390. /' 8,969.05 8,985.4
Z-16 7/3/08 APF 11,400. 11,410. / 8,993.58 9,001.76
Z-16 7/4/08 APF 11,260. 11,280. J 8,879.12 8,895.47
Z-16 7/4/08 APF 11,290. 11,300. / 8,903.65 8,911.82
Z-16 7/4/08 APF 11,320. 11,340. 8,928.17 8,944.52
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
•
Z-16
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE SUMMARY
7/2/2008:"*"*WELL SHUT-IN ON ARRIVAL"***
(E-LINE PERFORATING) INITIAL T/IA/OA: 2800/1425/200. RIGGED UP E-
LINE.
***JOB CONTINUED ON 3-JULY-2008""*
7/3/2008
*"*JOB CONTINUED FROM 2-JULY-2008"**
(E-LINE PERFORATIONS). ALL GUNS ARE 3-3/8" PJ3406 HMX
CHARGES, LOADED 6 SPF, 60 DEG PHASING. RUN#1, TAGGED TD AT
11419'. PERFORATED INTERVAL = 11370'-11390'. RUN #2
PERFORATED INTERVAL = 11400'-11410'. RUN #3, TAGGED TD AT
11414', TOOL STUCK AT TD AFTER 3RD TAG OF RUN #3. FLOWED
WELL TO FREE TOOL. PERFORATED INTERVAL = 11350'-11370'.
BEGIN RIH WITH GUN #4.
"""JOB CONTINUED ON 4-JULY-2008***
7/4/2008'*'`*JOB CONTINUED FROM 3-JULY-2008***
:RIH WITH GUN #4, MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG
:PHASING, 20 FT LOADED.
:PERFORATION INTERVAL= 1 1 320-1 1 340 FT. SURFACE AND VISUAL
INDICATION OF FIRE.
RIH GUN #5: MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG
PHASING, 10 FT LOADED. PERFORATION INTERVAL = 11290 - 11300
FT. SURFACE AND VISUAL INDICATION OF FIRE.
RIH GUN #6: MH-22/PEK-B/PGGT/3-3/8" PJ 3406, 6 SPF, 60 DEG
:PHASING, 20 FT LOADE PFRFC~RATION INT RVA = 11260 - 11280
FT. SURFACE AND VISUAL INDICATION OF FIRE.
:FINAL T/I/O: 2500/1400/200 PSI. WELL LEFT SHUT IN. SSV LEFT
:CLOSED PER DSO REQUEST.
***JOB COMPLETED***
FLUIDS PUMPED
BBLS
1 diesel
1 Total
) STATE OF ALASKA ) RECEIVE
ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 1 5 2,005
REPORT OF SUNDRY WELL OPERATI2a~~i'&GasComt
1. Operations Performed: AnchoraQ.e-,
AbandonD Repair WellO Pluç¡ PerforationsD Stimulate D '01:hefU
Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time ExtensionD
Change Approved Program D Operation Shutdown D Perforate IX] Re-enter Suspended Well 0
2. Operator
Name:
3. Address:
BP Exploration (Alaska), Inc.
4. Current Well Class:
Development Œ]
ExploratoryD
5. Permit to Drill Number:
192-0120
6. API Number
50-029-22245-00-00
P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
87.39
8. Property Designation:
ADL-047453
11. Present Well Condition Summary:
Stratigraphic 0 ServiceD
9. Well Name and Number:
Z-16
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
Total Depth measured 11669 feet
true vertical 9213.8 feet
Effective Depth measured 11582 feet
true vertical 9142.6 feet
Plugs (measured)
Top of Sand Plug @ 11425 (04-26-2005)
Junk (measured)
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 80 20" 91.5# H-40 33 113 33.0 113.0 1490 470
LINER 925 5-1/2" 17# 13Cr80 10739 - 11664 8454.6 - 9209.7 7740 6280
PRODUCTION 10982 7 -5/8" 29.7# NT -95 30 - 11012 30.0 - 8676.3 8180 5120
SURFACE 2961 10-3/4" 45.5# NT-80Ll 32 - 2993 32.0 - 2622.5
Perforation depth: SCANNED JUN 2 1 2005
Measured depth: 11256-11300,11320-11340,11350-11390,11400-11430
True vertical depth: 8876-8912,8928-8945,8953-8985,8994-9018
Tubinç¡ ( size, ç¡rade, and measured depth):
4-1/2" 12.6# L-80
@ 28
10738
Packers & SSSV (type & measured depth):
5-1/2" Baker L T Packer
4-1/2" Baker SABL-3 Packer
4-1/2" Baker SABL-3 Packer
Baker PBR Receptacle
4-1/2" Otis SSV Nipple
@ 10739
@ 8396
@ 10653
@ 10632
@ 2105
RBDMS 8Fl JUN 202005
12. Stimulation or cement squeeze summary:
Intervals treated (measured): 11256-11430
Treatment descriptions including volumes used and final pressure:
534 bbls 3% NH4CI, 142 bbls 90:10 DAD, 132 bbls Mud Acid @ 3700 psi CTU
Pressure
Prior to well operation:
Subsequent to operation:
Oil-Bbl
SHUT-IN
91
Representative Daily Averaqe Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
o
875 366 0
Tubing Pressure
o
273
13
Copies of Logs and Surveys run _
Daily Report of Well Operations _
!
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
Oil[!] GasD
Development ŒJ
Service D
14. Attachments:
Contact DeWayne Schnorr
Printed Name DeWayne Schnorr
A:4·/ÆJ~
WAG D GINJD WINJD WDSPLD
Prepared by DeWayne R. Schnorr (907) 564-5174
Sundry Number or N/A if C.O. Exempt:
N/A
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title
Petroleum Engineer
Signature
Phone
564-5174
Date
6/14/05
Form 10-404 Revised 4/2004
(~\
,.J
" f
~
1\ ~
.-.~: Ii
ù .. ¿.-....,
)
)
Z-16
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
04/28/05 MUD ACID TREATMENT/CTU # 9. INITIAL INJECTIVITY WAS 4.5 BBUMIN @ 2020 PSI
AFTER FLUID PACK. TAG TD @ 11420' CTM. PUMP MUD ACID PER PROGRAM. SAW
A SMALL INCREASE IN WHP DURING FIRST DIVERSION STAGE.. . JOB IN
PROGRESS
04/29/05 MUD ACID TREATMENT/CTU # 9. INITIAL INJECTIVITY WAS 4.5 BBUMIN @ 2020 PSI
AFTER FLUID PACK. TAG TD @ 11420' CTM.~ PUMP MUD ACID PER PROGRAM. SAW
DIVERSION IN ALL THREE STAGES. FINAL INJECTIVITY WAS 3.4 BPM @ 1625 PSI
WHP. LEAVE WELL SHUT IN. RDMO. TURN WELL OVER TO ASRC TO FLOW BACK.
NOTIFY PAD OP OF STATUS.. . ***JOB COMPLETE***
05/02/05 6 HOUR TEST. CORRECTED GROSS FLUID RATE 417.5 STBFPD. CORRECTED OIL
RATE 36.3 STBFPD. CORRECTED FORMATION GAS RATE 0.052 MMSCFPD. NET
WATER RATE 381.2 BWPD. LIFT GAS RATE 1.8 MMSCFPD. WHP 292 PSI. CHOKE
176 BEANS. AVERAGE W/C 91.9%.
FLUIDS PUMPED
BBLS
82 60/40 Methanol Water
534 3% NH4CI
142 90: 10 DAD Acid
132 Mud Acid
890 TOTAL
Page 1
)
TREE = CIW
WELLHEAD = Hie
ÄcfÜÄTÖR; ",^,w,,,,,,,,,wB'Ã'Rffi'
KB.ELEV = 87.04'
.. ...." .................
BF. ELEV = 54.01'
'KöÞ';;';' ... ...... ......", '''''99ä
,,~~~~.~Ie,,~ . ,~~~~~q'
Datum MD = 11270'
DatumTVO = 8800' SS
10-3/4" CSG, 45.5#, L-80, 0 = 9.953" 1-1 2993' r-J
Minimum ID = 3.725" @ 10726'
4-1/2" PARKER SWN NIPPLE
14-1/2" 1BG, 12.6#, L-80, .0152 bpf, 0 =3.958" 1-1 10738'
1 TOP OF 5-1/2" LNR 1-1 10739'
7-5/8" CSG, 29.7#, ID = 6.875" 1-1 11012'
PERFORA llON SUMrv\A.RY
REF LOO: ŒL ON 03/04/92
ANGLEA TTOP PffiF: 35 @ 11256'
I\bte: Refer to R'oductbn œ for historical perf data
SIZE SA= NTffiVAL Opn/Sqz DATE
3-3/8" 6 11256 - 11300 0 04/05/92
3-3/8" 6 11320-11340 0 05/03/92
3-3/8" 6 11350-11390 0 05/03/92
3-3/8" 6 11400 - 11430 0 05/03/92
1 PBTO H 11582'
15-1/2" LNR, 17#, 13-CR, .0232 bpf, 0 =4,892" H 11664'
DATE
03/15/92
03/09/01
03/13/01
06/19/01
REV BY COMtv'ENTS
SA LEH ORIGINAL COMR.ETlON
SIS-QAA CONVERTED TO CANVAS
SIS-MO FNA L
RNfTP CORRECTIONS
DATE
Z-16
e
L
i t
g Z
j l
I: I
J---A ~
~
REV BY
)
SAFETY NOTES: 5-1/2" CHROME LNR
2105' 1-14-1/2" OllS SSSV NIP, 0 = 3.813" 1
~ GAS LFT rv\A.NDRELS
ST tv[) TVO DEV TYPE VLV LATCH PORT DA. TE
3 3587 2982 41 C'AM BK
2 7077 5587 42 C'A M BK
1 8361 6750 39 C'AM BK
8387' 1-14-1/2" PARKERSWS NIP, 10=3.813" 1
8396' 1-17-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3,875"
10621' 1-I4-1/2"PARKERSWSNIP,10=3.813" 1
10632' 1-1 BAKER ÆIR REeEPfACLE 1
10653' 1-17-5/8" X 4-1/2" BKR SAB-3 PKR, ID = 3.875"
10726' H4-1/2" PARKERSWN NIP, ID = 3.725" 1
10738' IJ4-1/2" WLEG, ID= 3.958" 1
10724' 1-1 ELIv1D TT LOGGED 04/02/921
~
1 11409' 1-1 TOP OF SAND
II
00 rvTv1 ENTS
PRUDHOE BAY UNIT
WELL: Z-16
ÆRMrT No: 1920120
API No: 50-029-22245-00
SEe 19, T11 N, R12E, 982' FNL & 1926' FWL
BP Exploration (Alaska)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Julie Heusser,
Commissioner
THRU:
Tom Maunder,
P. I. Supervisor
DATE: April 21, 2001
FROM: Lou Gdmaldi, SUBJECT:
Petroleum Inspector
SVS Tests
BPX Z-pad
Prudhoe Bay Field
Saturday, April 21, 2001; I witnessed the three-month SVS retests on BPX Z pad
in the Westem Operating Area of the Prudhoe Bay Field.
Merv Liddelow performed the SVS tests today. The test results (one SSV Failure)
are noted on the accompanied SVS test spreadsheet. All well houses were in "OK"
condition.
This was the first experience I have had with the new SV control system on Z pad
and found it to operate quite well. The temperatures today were somewhat mild
(+15) and it remains. . to be ~seen how.. they will hold up dudng next winter's cold
season. Wells Z-5 and Z-8 had slow clOsing SSV's (+ 2 minutes), Merv called the
Automation crew and these were being worked on before I left the pad.
The pad is being used as a staging area for some pipeline fabrication and has
some equipment and material stored on it. This was kept for the most part neat and
orderly.
SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay
Field.
20 wells, 40 components, One'failure, 2~4%
34 Wellhouse inspections, no problems.
Attachments: SVS PBU Z pad 4-21-01 LG.XLS
NON-CONFIDENTIAL
SVS PBU Z pad 4-21-01 LG
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Lidde~l~w'
AOGCC Rep: Lou Grimaldi
Submitted By: Lou G. Date:
FieldFUnit~ad: .Prudhoe Bay Field, Z PM
Separator psi: LPS 159 HPS
21,Apr
, i i i . i j I~!! . i i t i .L i .i: ~ r i ! [ '. ' , ! . : ii i
Well Permit Separ Set L/P Test Test Test Date Oil, WAG, Gl]NJ,
Number Number PSI PSI ,TdP Code Code Code Passed GAS or CYCLE
Z-02A 1960430
Z-0~ 1971~i0' 1'59 '125' ' 115 ' P
z-on la'9~:~o
.
z-o~ ~0o7~o' .... ~ '~:~ ~
Z-06 1880320 159 125 125 P P
Z-07A 1931100i
Z~0sA ~9~':~0' 'i~...... i:~ ~:0
_
iZ-09 1890850!
.
Z-10 1891160
Z-12 1891020
Z-~nA ~S0~0
k.~ ....~a~oa~0
Z-17 1891390 159 125 125 P P
Z-18 1890960
Z-19 1920230
Z-20 1881000
z-:~A ~04~o ~ ~:~ ~:~ ~ P
. .
Z-25 1881590 159 125 125 P P
Z-26' 1890520 .... 159 125 125' P' P "
Z-27 1900310 '159 12~i 125 ~ P
, .... , ,,,,
Z-28' 1881270i
Z-29 '' 1890656! "159 i5~ 120 'P P ....
Z'30 ' i'900230 .... 159 i251 12o ? P ' "
Z-31 188ii20 ..........................
'Z-3'2B "1'97o34o 1'59 125' 125 P "-P ....
· . ,, , , , ,, ,i ,, , , ,
z-33^ ~89ooso
z-35 i98o93o .......
Z-38 1980600 159 125 120 P P
,
. , ,
RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~_~ ~_G
Well ! Permit
Number Number
Wells: 20
PSI PSI Trip Code I C°del Code I Passed
Components: 40 Failures: 1 Failure Rate:
Oil, WAG, GIN J, I
GAS or CYCLE
2.50% []] 9o Day
Remarks:
Z75 & 8 ,Long el°sure timeS on sSV. , .............
RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG
MEMORANDUM
State of Alaska
Alas'ka Oil and Gas Conservation Commission
TO:
Julie Heusser r~,'~ ~'~'
Commissioner
DATE:
January 23, 2001
THRU:
FROM:
Tom Maunder, ~.~._~~
P. I. Supervisor
Jeff Jones, SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Unit
Z Pad
Friday, JanUary 19,.2001' I traveled to BPX's Z Pad in the Prudhoe Bay Field and
witnessed surface safety valve system'testing.
Merv Liddelow was the BPX representative in charge of testing. As the attached
AOGCC Safety_ Val.~e System Test Report indicates I witnessed the testing of 21
wells and 43 components with 6 failures. The pilot on well Z-03 failed to trip and the
pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on
this well had an unacceptable closure time (12-min.). The SSV on well Z~18 also
had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24
failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90-
day test interval.
Mr. Liddlow indicated to me today that all failures have been repaired except the
slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need
to be flushed and he has arranged for the maintenance crew to perform the work.
Wellhouse inspections were conducted on the 21 wells tested with no exceptions
noted.
Summary: I witnessed SVS testing at BPX's PBU Z Pad.
21 wells, 43 components, 6 failures. 13,9% failure rate.
21 wellhouse inspections conducted.
.A.ttac. hme,nt: SVS PBU Z Pad 1-19-01 JJ
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: .Merv Lidde. low
AOCff2C Rep: ' 'jeff Jones
Submitted By: Jeff Jones
Field/Unit/Pad: PBF/PBUf-Z Pad
Separator psi: LPS 159
Date: 1/19/01
' ' " ' ....... ' ' .... .I I. I I I ............ -_':.:. '.-:..':~-.' ' :.. :.s.. -' . ....
Well Pemit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
Number Number PSI PSI Trip Code Code Code Passed ~AS or CYCI~
] i i i ii i i ii i ii
Z-01 1880~60 159 125' 125 P P OIL
Z-02A 1960430
Z-03' " 1971310 "159 i25''I ' "0" I P' ' ' ' OIL
Z-04 1891230 .................
Z-05 ' "1'900780 "'159 .... 125! 120 V P ' OIL
Z-06 1880320
Z'-0VA '1'951100 ...................
Z'08A i931280 159 "125~" 0 2 ' '43' ' ' 1/22/bl ' OIL
Z-09 1890850
Z-10 1891160 ~ .....
Z-11 1'900720! 159 ' i'25: '125 ' 'P P
Z , ...... . ..... , , , , , ,
-12 1891020!
Z-13 1~00940 ' 159 .... 1'25 " 155 'P P ....... 0IL
Z-14A 1980510:
Z15 ' ' '1880880~ ................
z-16 1920120 ~159 1'25 125 " P 'P ......... OIL
Z-17 1891'390 159 ...... i25 125 'P ..... P .......... OIL
Z-18 '1896960 159 125 '1:/0 P 43 ' ' OIL
Z-19 192023O
Z-20 '1881000
Z'-21 ','.'189042,0t .............
Z-22B 1960350 159 125 .125 P 4 OIL
Z-23A 1950430
Z'-24' 1896180 · 159 i25: 130 P 4 ......
Z-25 1881590 159 .... 12'5 13-5'' P ' P .............. OIL
Z-26 '1890520 159 1~1 ,, 125 V P" OIL
Z-27 ' 1900310 159 125 125 "P 13 ......... OIL
Z-28 1881270
Z-29 1891650 .... 159~ 125 120 P P ..... OIL
Z-30 1900230r '159 '12~" 1'15 'P P ............. 0iL
z-31 1881120
Z-32B 1970340 159 ''' i25 "125: .... V'- 'P OIL
Z-33A 1890050 2750 2660 2500 P P ' 'P GINJ
.
Z-35 " ' '198'69~0 159 12~ .... 120 ' P' P OIL
1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls
Well Permit Separ Set L/P Test Test Test Date
~l, WAC, cmJ,
. Number. Number PSI_ PSI Trip Code Code Code Passed GAS,,orCY,C,,LE
Z-38 1980600 159 125 120 .P P OIL
}Yells: ...... 2,1, Components: 43 Failures: 6 Failure Rate: 13.9%1~i~o my
Remarks:
Z-08A SSV ~fojl_ ed:_!2 ,minute,.c!o. se:,,,Z,-!,8 ~S...v, failed: 15,,minute cio,se, frgz,,e,n, pil~,,t _
_thawed & passed rete, s[,., ............ _ . . _
1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls
THE MATER/AL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
NOVEMBER 13, 2000
P
M
E
E
L E W
A T E R IA L U N D ER
TH IS M A R K ER
C:LORI~MFILM.~
STATE OF ALASKA
AD ..... ,A OIL AND GAS CONSERVATION COMMIS,
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
982' SNL, 1926' EWL, SEC. 19, T11N, R12E
At top of productive interval
2113' SNL, 2163' WEL, SEC. 30, T11N, R12E
At effective depth
2302' SNL, 1868' WEL, SEC. 30, T11N, R12E
At total depth
2353' SNL, 1881' WEL, SEC. 30, T11N, R12E
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE=87.39' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
z-16(32-3o. 11-12)
9. Permit number/approval number
92-12 /
'10. APl number
50- 029-22245
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11669 feet Plugs (measured)
9214 feet
11582 feet Junk (measured)
9173 feet
Casing Length
Structural --
Conductor 110
Surface 2960
Intermediate 10979
Production --
Liner 905
Perforation depth: measured
Size Cemented Measured depth
20 143
10 3/4 2300 cuft Class G 2993
75/8 1760 cu ft Class G 11012
5 1/2 202 cu ft C/ass G 10757-11662
8450'-8456',8550'-8556', 11254'-11276', 11276'-11300'
true vertical subsea6699'-6704',6776'-6781',8852'-8861',8861'-8912'
Tubing (size, grade, and measured depth) 4 1/2" @ 10738'
Packers and SSSV (type and measured depth) Packer @8396' & SSSV @2105
True vertical depth
BKB
143
2622
8675
8468-9207
AUG 1995
.Oil & Gas Cons. Commission
, 't~,nchorage
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
Oit-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
433 2106 10 0
726 3130 324 0
260
284
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the fo~g~~~orrect to the best of my knowledge.~-'-~~
Form 10-40'4 Rev 06/15/88
Date ~/~ ~'~"
SUBMIT IN DOPL~ATE
9/13/94
10/06/94
WELL Z-16(32-30-11-12)
Stimulation Operation
A HCL Treatment was performed to remove scale using the
following fluids:
OPERATIONS SUMMARY
Run in hole with tubing end locator and 2.5" combo nozzle.
Locate tubing tail. Run in and tag fill @ 11411. Wash54 4 ft of
hard fill (1.5 hour), then could not make more progress. Pumped
5 bbl 15% acid and broke though. Cleaned out fill to 11460 with
biozan & sea wtr with gas lift. Noticed tight spot @ 11418 that
wasn't jetting away. Jetted perfs with 19 bbl 15% HCL. Let acid
soak. Concentrated jetting on lower set of perfs where tight spot
was. Let acid soak for 30 min. Tight spot gradually disappeared so
it must have been scale buildup in casing. Flushed biozan, solids,
and acid out of hole with filtered sea wtr while tripping out.
Picked up additional riser and Baker SST tool string.pressure test
all eqpt. 4000 psi pump 100bbl filtered sea water dn. tbg. (well
dead.) Test set SST above perfs & worked spotting valve. Tried to
reset SST @ 1st set point-would not inflate. Picked up to tail pipe
to wratchet FCV. Ran back in. Still could not set. Ran back to tail
and wratchted again and successfully set SST below tail. Ran back
to Set #1 and set SST. Inj into formation @ .3 bpm 3000 psi.
Opened spotting valve and spotted fluids to SST. Closed spotting
valve and pumped acid as per program max rate was 0.70 BPM at
3190 psi. Moved up the hole to 11,398 and set packer. Spotted
fluids and commenced injection. Injection rste was brought up
to 1.0 BPM. After 27 bbls of acid out, the pressure dropped on the
packer side and increased on the annulus. Unable to release
packer. Sheared disc at 5,000 psi and POOH. ALL OF THE TOOL
STRING BELOW THE EMERGENCY DISCONNECT LEFT IN HOLE W/3" GS
LOOKING UP (SEE B.H.A. FOR DETAILS. RIG DOWN COIL UNIT. NOTE
( TOP OF FISH @ 11,385' )
FLUIDS PUMPED
793 Sea Water
35 Biozan
24 15% HCL w/additves
A bullhead Scale Inhibitor was performed using the following
fluids:
OPERATIONS SUMMARY
Pumped BH Scale inhibitor job per program. WHP increased
significantly when liquids reached the perforations. Maintained
1830 psi WHP while pumping 4.9 bpm.
100 Bbl.
25 Bbl.
70 Bbl.
65 Bbl.
175 Bbl.
435 Bbl
FLUIDS PUMPED
Seawater pre-flush w/GS-6 and NE-41
Seawater spacer w/GS-6 and NE-41
Seawater w/10% ESL and activator
Seawater overflush w/GS-6 and NE-41
Seawater displacement to the perforations
Total Volume. All fluids filtered to 3 microns
A~
TRANSMITTAL AND ACKNOWLEDGEMENT OF RECEIPT
TO: AOGC
ANCHORAGE, AK
MA TERIALS RECEIVED VIA::
CORE LAB PERSONNEL
ITEMS RECEIVED:
CHIP SAMPLES FOR THE STATE FROM BEAVER CREEK #9
BOX 1 6376-6404 FT
BOX 2 6405-6428 FT'
BOX 3 6429-6455 FT
Shipped by: PERRY BROWN for CORE LAB Date: 17-May-95
__,1' , ~1!
Received by: '~~ ~~~/~ for ~ 4D~_~ Date: . r-/- r .,, r- r~
, R E~ E i V r...IJ
Please note that the items listed above are inventoried, shipped and received in good faith, but due to errors, are subject to minor adjustments.
In such case both shipper and receiver agree to make a timely and bona fide effort to correct any observed discrepancies.MA Y 1 7' 1995
CORE LASO~TOF~ES ~X~5 SCHOON ST., ^NOHORAGE, ALASKA 99~8 (9071 ~49~1~ Ull & Gas Cons. Commission
A~l~orat,?,
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date= 10 August 1994
RE= Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
J-09
~¥~7~
N-26 (21-7-11-13)
~ ~ °OZ'B-7
DESCRIPTION
1 CCL/TUBCUTR FINAL BL
I CCL/TUBCUTR RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1 PL/SPNR FINAL BL
1 PL/SPNR RF SEPIA
B-16 (21-32-11-14)
1 PL/SPNR FINAL BL
1 PL/SPNR RF SEPIA
R-21
i PLS STATIC FINAL BL
i PLS STATIC RF SEPIA
W-25 (14-16-11-12)
Z-28
1 PLS BASKET FINAL BL
1 PLS BASKET RF SEPIA
i PLS SPNR FINAL BL
1 PLS SPNR RF SEPIA
1 PLS SPNR FINAL BL
1 PLS SPNR RF SEPIA
Cont/
Please sign and ~eturn ~.'
Petrotechnical Data Cente=
BP Exploration (Alaska)
900 East Benson Boulevard
Anchorage, Alaska 99508
Received by
Date
ECC No.
Run # 1 6247.01
Run ~ 1
Run ~ 1 6245.01
Run # 1
Run ~ 1 6233.01
Run ~ i
Run ~ I 5784.06
Run $ 1
Run ~ 1 4041.01
Run # 1
Run ~ I 4952.02
Run # 1
Run ~ 1 4323.01
Run $ 1
Run $ 1 6162.02
Run $ 1
Run # 1 5636.04
Run # 1
?ERMIT
)2-012
92-012
)2-012
92-012
)2-012
92-012
)2-012
92-012
)2-012
DATA
BHCA/GR
CBT
CCL (PERF)
CNL/GR
DIFL/GR
GR/CCL/JWL
PFC/GR
PFC/GR
AOGCC Individual Well
Geological Materials Inventory
T DATA_PLUS
L 10900-11628
L 7700-11514
L 11150-11539
L 10900-11604
L 10900-11657
L 8300-11573
L 11160-11498
L 8300-8650
PROD/SPIN/TEMP/ L 11150-11469
92-012 USIT (C&C)
92-012 407
92-012 407
L 7700-11542 1
R COMP DATE: 03/15/92
R COMP DATE: 04/05/92
92-012
DAILY WELL OP
92-012 SURVEY
92-012 SURVEY
92-012 5217
R 02/09/92-03/15/92
R 0-11036, MWD
R 0-11669, GCT
T 8300-11700, OH~~.
Page:
Date:
RUN
~re dry ditch samples required? yes. And received?
Was the well cored? yes~~lysis & description received?
~re well tests required~ ~es..--n~ R¢~~eived? yes~
Nell is in compliance '~ -" .~
3omments
1
03/31/94
DATE_RECVD
03/24/92
03/24/92
04/24/92
03/24/92
03/24/92
04/15/92
05/14/92
03/24/92
07/14/92
03/24/92
10/07/92
02/11/93
10/07/92
10/07/92
10/07/92
03/21/92
STATE OF ALASKA ~
AL-~ .~ OIL AND GAS CONSERVATION COMMISS
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate Plugging__ Perforate X
Pull tubing Alter casing __ Repair well Other
2. Name of Operator
BP Exploration (Alaska)/nc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
982' SNL, 1926' EWL, SEC. 19, T11N, R12E
At top of productive interval
2113' SNL, 2163' WEL, SEC. 30, T11N, R12E
At effective depth
2302' SNL, 1868' WEL, SEC. 30, T11N, R12E
At total depth
2353' SNL, 1881' WEL, SEC. 30, T11N, R12E
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE=87.39' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Z- 16(32-30-11-12)
9. Permit number/approval number
92-12 /
10. APl number
50- 029-22245
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2960
Intermediate 10979
Production --
Liner 905
Perforation depth: measured
11669 feet Plugs (measured)
9214 feet
11582 feet Junk (measured)
9173 feet
Size Cemented Measured depth
20 143
10 3/4 2300 cu fl Class G 2993
7 5/8 1760 cuft Class G 11012
5 1/2 202 cuft C/ass G 10757-11662
8450'-8456',8550'-8556', 11254'-11276', 11276'-11300'
true vertical subsea6699'-6704', 6776'-6781 ',8852'-8861 ',8861 '-8912'
Tubing (size, grade, and measured depth) 4 1/2" @ 10738'
Packers and SSSV (type and measured depth) Packer @8396' & SSSV @2105
True vertical depth
BKB
143
2622
8675
8468-9207
RECEIVED
OCT --1 993
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Alaska Oil & 6as Cons,
Anchorage
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
430 2100 0 1020
..
2080 5052 558 0
Tubing Pressure
283
345
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby (;ertify that the foregoing is true and correct to the best of my knowledge.
Si~lned ~A/~,¢1¢.,,~,~ (~q,-~ Title Senior Technical Assistant/
Form 10-404 Rev 06/15/88 /
Date ,/d,)/b/'~ ?
SUBMIT IN DUP'LI(~AT-E _~--
5/02/92
f~h
7/19/93
WELL Z-16(32-30-11-12)
Add. err
The following interval were added using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
11320' - 11340' MD
11350' - 11390' MD
11400' - 11430' MD
RECEiV[!>
0 O qr' - ',z 1993
Alaska Oil & Gas Ocms. L;oflltnlg$/u;
Anchorage
?'"' STATE OF ALASKA ~'~
ALASKA OIL AND GAS CONSERVATION COMM
WELL COMPLETION OR RECOMP LETION REPORT AND LOG"
1. Status of Well Classification of Service Well
OIL [] GAS ri SUSPENDED [] ABANDONED [] SERVICE [] Revi~;ion #1
2. Name of Operator 7. Permit Number
BP Exploration 92-12
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22245
4. Location of well at surface 9. Unit or Lease Name
982 SNL, 1926 EWL, SEC. 19, T11N, R1 ~.~,~... ~::~u4 }: ~ Prudhoe Bay Unit
· :' ..... ~'~ ~ V~.I~I~D i 10. Well Number
At Top Producing Interval ~ ~;-'.~._~ ~ ~ .
, , i~ ~--~ :2, ~ .~,,.L~._~ Z- 16 (32-30-11-12)
2113 SNL, 2163 WEL, SEC. 30, T11N, R12E~.~ .
Field/Prudhoe
Bay
Pool
2353' SNL, 1881' WEL, SEC. 30, T11N, R12E
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 87.39' I ADL 47453
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if olfsho re 116. No. of Completions
2/10/92 3/1/92 4/05/92I N/Aeet MSL I One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey [20. Depth where SSSV set [21. Thickness of Permalrost
11669' MD/9214' TVD 11582' MD/9173' TVD YES ~ NO []! 2105feet MD! 1892'
22. Type Electric or Other Logs Run
CBL/USl T/GR/CCL
23. CASING, LINER AND CEMENTING RECOFID
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENT]NG RECORD AMOUNT PULLED
20' Cond. Weld Surface
10-3/4 45.5# J-55 Surface 2993' 13-1/2" 2300 cuft ASIII/460 cu ft fl Class "G"
7-5/8' 29.7# NT95HS Surface 11012 9-7/8 1760 cuft Class G
5-1/2' 17# 13CrNT80 10757 11662 6-3/4 202 cuft Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD} PACKER SET (MD)
Western Atlas 4-1/2" 10738' 8396'
MD TVD
8550'- 8556' 6776'-6781' 4 spf
82150'- 8456' 6699'-6704' 4 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11254'- 11276' 8852'-8861' 6 spf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11276'- 11300' 8861'-8912' 6 spf
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
04-06-92 I Gas lifted producer
Date of Test Hours Tested PRODUCTION FOR OIL-BBL ,.~AS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
ECEtVED
AJaska 0il & Gas Cons, C0mmissiof~
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
I.~. ~ 30.
GEOLOGIC MARKERS P~HMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag River 11044' 8616'
Shublik 11080' 8645'
Zone 4 11251' 8785'
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Sig ned T it l e Drilling_ En_oineer Suoervisor Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, ,%ub~e~ibla
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none". ._~
Form 10-407 Anch0raga
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION CO~wMISSION ~
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL IXl GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
BP Exploration 92-12
3. Address 8. APl Number
P. O. Box 196612, Anchora~le, Alaska 99519-6612 50- 029-22245
4. Location of well at surface ~ ....................... ~ --- 9. Unit or Lease Name
982'SNL, 1926'EWL, SEC. 19, T11N, R12E ~ =~ ~,:~[~t
Prudhoe
Bay
Unit
2113'SNL, 2163'WEI, SEC. 30,At Top Producing Interval T11N, R12E ! ~!F~[r~ ~ ~~ Z-16($2-30-11-12)
At Total Depth '~'~'~<~' ..... ~J Prudhoe Bay Field/Prudhoe Bay Pool
2~3'SNL, 1881'WEL, SEC. 30, T11N, R12E
5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No.
KBE = 87.39' ) ADL 47453
12. Date Spudded 13. D~e T.D. Reached 14. Date Comp., Susp. or Aband. m15. Water Depth, if offshore ~16. No. of Completions
2/10/92 3/1/92 3/15/92~ N/Aeet MSL m one
m
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey ~20. Depth where SSSV set 21. Thickness of Permafrost
11669'MD/9214'~D 11582'MD/9173'TVD ~ ~ ~ ~~ 2105Feet MD 1892'
22. Type Electric or Other Logs Run
CBUUSIT/GR/CCL
23. CASING, LINER AND CEMENTI~ R~ORD
SE~ING DEP~ MD
CASING SIZE ~. PER ~. G~DE TOP ~OM ~LE SIZE C~I~ R~ORD A~UNT ~LLED
20' Cond. Weld Sudace
10-3/~ 45.5~ J-55 Su~ace 2993' 13-1/2" 2300 cuff ASIII/460 cuff ft C/ass "G"
7-5/8' 29.7~ NT95HS Sudace 11012 9-7/8 1760 cu ~ C/ass G
5-1/2' 17~ 13CrNT80 10757 11662 6-3/4 202 cu ~ C/ass G
24. Pedorations open to Production (MD+TVD of Top and Bottom and 25. ~BINGR~ORD
interval, size and number) SIZE DEP~ SET(MD) PACKER SET
Western At/as 4 spf 4-1/2" 10738' 8396'
26. ACID, F~C~RE, CEMENT ~UE~, ~C.
MD ~D DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL ~
~50'- 8~6' 6776~6781'
~0t 8~6' 6699~6704'
27. PRODUCTION TEST
Date First Production )Method of Operation (Flowing, gas lift, etc.)
04-06-92 I Gas/i~edproducer
Date of Test Hours Tested PROD~TIONFOR OIL-BBL GAS-MCF WATER-BBL C~KES~E ~GAS-OIL RATIO
TEST PERIOD ~
I
Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Briel description ol lithology, porosity, ~ractur~, apparent dips, and pr~ence ct oil, gas or water. Submit ~re chips.
RECEIVED
OCT 7
Alaska Oil & Gas Cons.
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS h~RMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag River 11044' 8616'
Shublik 11080' 8645'
Zone 4 11251' 8785'
RECEIVED
oor- '/'
Alaska Oil & Gas Cor~s. Commission
Anchorage
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /~~ Title WorkovorEno_inoerSuoervisor Date ... ] fJ/~'/~'['
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: Z-16
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-029-22245
PERMIT:
APPROVAL:
ACCEPT: 02/10/92 05:02
SPUD: 02/10/92 06:02
RELEASE: 03/15/92 02:03
OPERATION:
DRLG RIG: NABORS 28E
WO/C RIG: NONE
02/09/92 (1)
TD: 0' ( 0)
MOVING RIG
MOVING RIG FROM DS 4-34 TO Z-16
MW: 0.0 VIS: 0
02/10/92 (2)
TD: 0'( 0)
RIGGING UP/ACCEPT RIG MW: 0.0 VIS: 0
MOVE TO Z-PAD. N/U. ACCEPT RIG 0500 HRS. 2/10/92
02/11/92 (3)
TD: 600'( 600)
02/12/92 ( 4)
TD: 2000' (1400)
KICKING OFF MW: 9.5 VIS:300
DRILL 37' OF ICE AT SURFACE. TAGGED UP AT 113' SPUD WELL
& DRILL TO 479'. CIRC. POOH. TIH.
DRILLING IN 13-1/2 HOLE
DRILLING FROM 600 TO 2000
MW: 9.9 VIS:300
02/13/92 (5)
TD: 3005'(1005)
02/14/92 ( 6)
TD: 3005' ( 0)
02/15/92 ( 7)
TD: 4053'(1048)
02/16/92 (8)
TD: 6150' (2097)
CMT 10-3/4 CASING MW:10.4 VIS:300
DRILLING TO 3005'. CIRC. SHORT TRIP. CIRC. PUMP PILL.
POH. L/D 13-1/2 BHA. R/U 10-3/4 CASING. CIRC. & COND.
DRLG FC. MW: 9.1 VIS: 30
PUMP CMT. DISP W/ RIG PUMPS. L/D CMT HD, LAND JT. N/D
DIVERTER. INSTALL SPEEDHD. N/U BOPE. TEST BOPE. P/U NEW
BHA. RIH W/ NIT #2. TAG FC @ 2914'. CIRC. TEST CSG.
DRLG PLUGS, FC.
DRILLING AHEAD MW:10.4 VIS: 57
CIRC. DRILLED FROM 3015 - 3490. CIRC. DRILLING FROM
3490 - 3803' CIRC. DRILLED FROM 3803 - 4053'.
DRILLING AHEAD IN 9-7/8 HOLE
DRILLING FROM 4043 - 6150
MW:10.6 VIS: 51
02/17/92 (9)
TD: 7130' ( 980)
02/18/92 (10)
TD: 8250' (1120)
DRILLING AHED IN 9-7/8 HOLE MW:10.6 VIS: 51
DRILLED FROM 6150 - 6438' CIRC. PUMP PILL. POH. RIH
W/BIT #3 TO 3045'. CBU. RIH TO 6395' DRILL TO 6849'
CIRC. DRILLED TO 7130'
DRILLING IN 9-7/8 HOLE
DRILLING FROM 7130 0 8250'.
MW:10.6 VIS: 51
REC£J¥ D
Alaska Oil & Gas Oons.
Anchorage
WELL : Z-16
OPERATION:
RIG : NABORS 28E
PAGE: 2
02/19/92 (11)
TD: 8749' ( 499)
02/20/92 (12)
TD: 9220' ( 471)
02/21/92 (13)
TD: 9827' ( 607)
DRILLING TO 8749'. MW:10.6 VIS: 56
DRILLED AND SURVEYED 8250 - 8470'. CBU. POOH. RIH. RIH.
CBU. DRILLED TO 8593'. CIRC. DRILLED AND SURVEYED 8593 -
8749'.
DRILLING AT 9220' MW:10.6 VIS: 49
DRILLED & SURVEYED 8749 - 9129'. CBU. POOH. DRILLED TO
9220'.
DRILLING AT 9827'
DRILLED AND SURVEYED 9220 - 9827'.
MW:10.6 VIS: 45
02/22/92 (14)
TD: 9890' ( 63)
02/23/92 (15)
TD:10425' ( 535)
02/24/92 (16)
TD:10684' ( 259)
02/25/92 (17)
TD:l1036' ( 352)
02/26/92 (18)
TD:l1036' ( 0)
02/27/92 (19)
TD: 11036' ( 0)
02/28/92 (20)
TD: 11120' ( 84)
02/29/92 (21)
TD:11259' ( 139)
DRILLING AT 9890 MW:10.6 VIS: 45
DRILLED AND SURVEYED 9827 - 9831' CBU. POOH TO 7741'
RIH. CIRC. POOH. CIRC. & ROTATE. POOH. TEST BOP. RIH.
DRILLED TO 9890'.
DRILLING AT 10425' MW:10.7 VIS: 50
DRILLED & SURVEYED TO 10310'. POOH. RIH. DRILLED TO
10425'
DRILLING AT 10684' MW:10.7 VIS: 49
DRILLED AND SURVEYED FROM 10425 - 10548'. CBU. PUMP
PILL. POH. RIH. REAM TO 10548' DRILLED AND SURVEYED FROM
10548 - 10684'.
POOH (SLM) MW:10.7 VIS: 44
DRILLED AND SURVEYED 10684 - 11023'. CBU. DRILLED 11023 -
11036'. CIRC. PUMP PILL. POOH (SLM)
CMT 7-5/8" CSG. MW:10.7 VIS: 45
POOH. TEST BOPE. RIH W/ 7-5/8" CSG. LOST MUD RETURN @
6481' RIH SLOW. M/U CMT HD. TEST CMT LINES. CMT CSG.
RIH W/BIT #8 MW:10.3 VIS: 43
INSTALLED & TESTED 7-5/8 PACKOFF. TESTED BOP. L/D 5: DP.
P/U 6-3/4 BHA. P/U & RIH W/3-1/2 DP.
DRLG. MW: 9.6 VIS: 60
RIH. CIRC. TEST CSG. DRLG PLUGS, FC F/ 10924'-10932'
DRLG CMT F/ 10932'- 10995'. CBU. CHANGE OVER TO XCD
POLYMER MUD. DRLG CMT, FS, RAT HOLE TO 11036'. DRLG F/
11036'-11059'. REAM F/ 11040'-11059' CIRC & RAISE MUD WT
TO 9.6 PPG. DRLG F/ 11059'-11112'
RIH WITH BIT %9 MW: 9.6 VIS: 74
DRILLED TO 11259' PUM PILL. POH & CHANGE BIT. RIH TO
1152'. RIH.
.AJaska .Oil .& Gas Cons.
Anchorag~
WELL : Z-16
OPERATION:
RIG : NABORS 28E
PAGE: 3
03/01/92 (22)
TD:11669' ( 410)
03/02/92 (23)
TD: 11669' ( 0)
03/03/92 (24)
TD: 11669' ( 0)
03/04/92 (25)
TD:11582' ( 0)
03/05/92 (26)
TD:11582
PB:11582
CBU MW: 9.6 VIS: 46
DRILL TO 11574'. PUMP DRY JOGB. POH. RIH W/B IT #10.
REAM FROM 11495 - 11574' DRILL TO 11669' (TD) CBU.
LOGGING 6-3/4 HOLE MW: 9.6 VIS: 52
SHORT TRIP TO 10984' CIRC. POH. RIH. TAGGEND BOTTOM.
WASHED & REAMED. POH. R/U ATLAS.
CEMENTING 5-1/2 LINER MW: 9.7 VIS: 59
RIH. CIRC. POH FOR LINER. RIH W/CHROME LINER. CIRCULATE
& CONDITION MUD.
POH FOR LOGS MW: 8.9 VIS: 0
SET HANGER & PACKER. REVERSE CIRC. POH WET. RIH W/BAH
#10. TESTED LINER. POH. L/D DP.
R/D CASING CREW
POOH. L/D BHA. RUN CBL.USIT/GR/CCL.
MW: 8.9 CaBr
03/06/92 (27)
TD:11582
PB:11582
POOH TO PERFORATE 7-5/8 CASING MW: 8.9
P/U BHA #1 & 3-1/2 DP. INCREASE MUD TO 10.8+. SQUEEZED.
POOH. WESTERN ATLAS PERFORATING.
WBM
03/07/92 (28)
TD:11582
PB:11582
03/08/92 (29)
TD:11582
PB:11582
WOC MW:10.5 WBM
PERFORATE 8450 - 8550' TEST BOPS. RIH. SET RET AT 8525.
UNSTING & GET SBR STING IN. CIRC. PACKOFF. ATTEMPT TO
REV CIRC. UNSTING. PUMP 20 BBLS WATER 100 SX CEMENT, 7
BBLS WATER. SQZ 10 BBLS WATER, 10 BBLS, CEMENT BELOW RET.
REST OF CEMENT ABOVE RET. POOH 10 STDS. REV CIRC. POOH.
WOC.
WOC MW:10.5 WBM
P/U. RIH. TAG CEMENT AT 8436'. WOC. CBU. TIH. CBU.
TEST LINES. POOH. P/U BIT & BHA & RIH TO 8000'.
03/09/92 (30)
TD:11582
PB:11582
03/10/92 (31)
TD:11582
PB:11582
WOC MW:10.5 WBM
WOC. CIRC & COND MUD. TAG CEMENT AT 8357' TEST CASING.
DRILL SOFT CMT 8357-8470. DRILL FIRM CEMENT 8470-8515.
CBU. TEST TOP PERFS 8446-8450'. CBU. TEST BOTTOM PERFS.
POOH. P/U HOWCO & RIH. WASHED & CIRC. PUMP WATER,
SLURRY. POOH. SQUEEZED. NOTE: EFC RAISED DUE TO THREE
SQUEEZES IN THE 7-5/8" CSG TO SEAL OFF KUPARUK SANDS.
CBU TP TEST BOTTOM SET OF PERS MW:10.5
WOC. POOH. M/U BIT #14 & BHA. TIH. TAG CEMENT AT 8052'
CBU. DRILLING HARD CEMENT FROM 8465 - 8560' CBU.
WBM
WELL : Z-16
OPERATION:
RIG : NABORS 28E
PAGE: 4
03/11/92 (32)
TD:11582
PB:11582
CLEAN OUT 5-1/2 LINER MW:10.5 WBM
TESTED LOWER PERFS. CIRC. DRILLED HARD CEMENT FROM 8560 -
8566'. CIRCULATE. POOH. L/D BHA. P/U 2-7/8 DP. RIH.
03/12/92 (33)
TD:11582
PB:11582
03/13/92 (34)
TD:11582
PB:11582
RIH W/FTA#2 MW:10.5 WBM
CIRCULATE. TEST CASING. POOH & L/D 2-7/8 DP. LOST IN
HOLE 4-3/4 ECONO MILL, BIT SUB, & 20 3-1/2 DRILL COLLARS.
RIH. POOH & L/D FTA#1. R/U FTA#2. RIH.
RIH W/PACKER ON DP MW:10.5 WBM
RIH W/FTA #2. POOH. L/D FTA #2. RIH TO TOP OF LINER
10740'. CIRCULATE. POOH. L/D BHA RIH 3/3-1/2 DP.
03/14/92 (35)
TD:11582
PB:11582
SHEAR RP VALVE MW:10.6 WBM
RIH. POOH & L/D 3-1/2 DP. RUN 4-1/2 COMPLETION. TEST
ANNULUS. TEST CONTROL LINES. SET PACKER.
03/15/92 (36)
TD:11582
PB:11582
RIG RELEASED MW: 8.9 WBM
SET BPV. N/D BOP. PULL BPV. TEST TREE. RELEASE RIG 0200
HRS.
SIGNATURE:
(drilling superintendent)
DATE:
RECE!VE[ )
ORiGiNAL
?~ ~/~
SUB - S URFA CE
DIRECTIONAL
F'~ UIDANCE
~'J ONTINUOUS
F'~ OOL
Company BP EXPLORATION
SURVEY MICI OFILMEI
Well Name Z-16 (32-30-11-12)(982'FNL,1926'FWL,SEC 19,T11N,R12E)
Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA
Job Reference No. Date
92248 02-APR-1992
Loqcled By: Computed By:
G. JOHNSON S. DEES
SCHLUMBERGER
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
SURVEY DATE: 02-APR-1992
ENGINEER: G. JOHNSON
METHODS OF COMPUTATION
TOOL LOCATION: TA~GF_~IAL- Averaged deviation and azimuth
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 10 DEG 13 MIN EAST
COMPUTATION DATE: lO-APR-g2 PaGE I
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY- 02-APR-1992
KFILY BUSHING ELEVATION- 87.39 FT
ENGINEER' G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/100 FEET FEET FEET DEG
0 O0
100 O0
200 O0
300 O0
400 O0
500 O0
6O0 O0
700 O0
800 O0
900 O0
0 O0
100 O0
200 O0
299 99
399 99
499 97
599 94
699 78
799 23
898 23
-87.39
12 61
112 61
212 60
312 60
412 58
512 55
612 39
711 84
810 84
0 0 N 0 0 E
0 22 N 78 55 E
0 25 N 85 19 E
0 33 S 79 34 E
0 47 S 69 36 E
1 1 S 51 55 E
2 3 S33 11E
4 28 S 20 59 E
7 5 S 1628 E
9 0 S15 7E
0 O0
0 11
0 15
0 33
0 84
1 84
4 05
9 30
19 60
33 61
0 O0
0 22
0 19
0 5O
0 O0
0 28
2 50
2 25
1 54
2 24
0
1
3
7
17
31
0 O0 N
0035
O06N
0 02N
31 S
08 S
03 S
95 S
84 S
39 S
000 E
050E
1 17 E
1 94 E
303 E
437 E
604 E
8 36 E
11 54 E
15.33 E
0 O0 N 0 0 E
0
1
1
3
4
6
11
21
34
5O S 87 4 E
17 N 87 11 E
94 N 89 32 E
04 S 84 10 E
5O S 76 7 E
76 S 63 2O E
53 S 46 27 E
24 S 32 54 E
93 S 26 2 E
1000 O0
1100
1200
1300
1400
1500
1600
1700
1800
1900
996 66
O0 1093
O0 1188
O0 1280
O0 1372
O0 1465
O0 1557
O0 1648
O0 1735
O0 1819
909 27 11 30
81 1006
67 1101
95 1193
89 1285
41 1378
26 1469
33 1560
g9 1648
75 1732
42 15 53
28 21 8
56 23 31
50 22 25
02 22 27
87 23 55
94 25 34
60 31 56
36 33 38
S 12 52 E 51.21
S 9 33 E 74.76
S 10 58 E 106.30
S 13 48 E 144.77
S 14 13 E 184.01
S 12 1E 221.89
S 9 15 E 261.42
S 7 12 E 302.71
S 7 21E 350.62
S 7 37 E 405.18
3 06
4 2O
4 54
0 73
0 35
1 18
1 2O
5 46
4 04
0 66
48 49 S
71 62 S
102 71S
140 28 S
178 44 S
215 37 S
254 24 S
295 14 S
342 78 S
396 93 S
19 65 E
24
29
37
47
55
63
69
74
81
52 32 S 22 4 E
10 E 75
37 E 106
88 E 145
36 E 184
98 E 222
20 E 261
O4 E 303
87 E 350
98 E 405
57 S 18 36 E
83 S 15 57 E
30 S 15 7 E
62 S 14 52 E
53 S 14 34 E
98 S 13 58 E
11 S 13 10 E
86 S 12 19 E
31 S 11 4O E
2000 O0 1902.30 1814.91 36 9
2100
2200
2300
2400
2500
2600
2700
2800
2900
O0 1978.61 1891.22 44 20
O0 2047.34 1959.95 47 20
O0 2115.38 2027.99 46 26
O0 2186.84 2099 45 43 4
O0 2259.79 2172 40 43 16
O0 2332.53 2245 14 43 7
O0 2406.37 2318 98 42 11
O0 2480.41 2393 02 42 18
O0 2554.16 2466 77 42 36
S 7 48 E
S 7 21 E
S 7 9 E
S 7 5 E
S 847 E
S 12 13 E
S 14 17 E
S 14 12 E
S 13 46 E 1012
S 13 9 E 1080
461.55
525.97
598.49
671 66
741 52
809 91
878 39
945 66
73
15
6 89
9 50
0 66
3 56
1 02
4 84
2 43
0 24
0 59
0 61
452.86 S
516.77 S 98
588.82 S 107
661.55 S 116
730.8O S 125
798.19 S 137
864.82 S 153
930.18 S 170
995.40 S 186
1061.07 S 202
89 51 E 461 62 S 11 11 E
05 E 525
13 E 598
16 E 671
81E 741
42 E 809
83 E 878
43 E 945
71E 1012
43 E 1080
99 S 10 45 E
49 S 10 19 E
67 S 9 58 E
55 S 9 46 E
93 S 9 46 E
39 S 10 5 E
67 S 10 23 E
75 S 10 37 E
21 S 10 48 E
3000 O0 2627.62 2540.23 42 48
3100
3200
3300
3400
3500
3600
3700
3800
3900
O0 2700 72 2613.33 43 5
O0 2773
O0 2847
O0 2922
O0 2998
O0 3073
O0 3149
O0 3225
O0 3300
83 2686.44 42 46
51 2760 12 42 5
50 2835 11 41 10
07 2910 68 40 46
69 2986 30 40 48
57 3062 18 40 28
65 3138 26 40 41
69 3213 30 42 5
S 12 41E 1147 93
S 12 30 E 1216
S 13 31E 1284
S 13 51E 1351
S 13 40 E 1417
S 14 57 E 1483
S 15 40 E 1548
S 15 19 E 1613
S 14 53 E 1677
S 15 17 E 1743
11
26
74
77
11
27
12
79
64
0.58
0.04
1.20
2 26
0 28
1 56
0 99
0 66
0 95
1 06
1127.20 S 217.59 E 1148 O1 S 10 56 E
1193 81 S 232.44 E 1216
1260
1325
1390
1453
1516
1579
1642
1706
32 S 247.62 E 1284
99 S 263.72 E 1351
25 S 279.44 E 1418
76 S 295.37 E 1483
83 S 312.82 E 1548
58 S 330.26 E 1613
26 S 347.10 E 1678
08 S 364.30 E 1744
23 S 11 1E
41 S 11 7 E
96 S 11 15 E
05 S 11 22 E
47 S 11 29 E
75 S 11 39 E
74 S 11 49 E
54 S 11 56 E
54 S 12 3 E
COMPUTATION DATE: lO-APR-g2
PAGE 2
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY' 02-APR-1992
KELLY BUSHING ELEVATION' 87.39 FT
ENGINEER' G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET 0f MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
4000 O0 3374.65 3287 26 42 20
4100
4200
4300
4400
4500
4600
4700
4800
4900
O0 3448.61 3361 22 42 19
O0 3522.24 3434 85 42 52
O0 3595.36 3507 97 43 8
O0 3668.28 3580 89 43 13
O0 3741,05 3653 66 43 26
O0 3813.63 3726.24 43 25
O0 3886.58 3799.19 42 46
O0 3960.13 3872.74 42 25
O0 4034.42 3947.03 41 44
S 14 51E 1810 70
S 14 10 E 1877
S 14 9 E 1945
S 13 56 E 2013
S 13 42 E 2081
S 13 32 E 2150
S 13 22 E 2218
S 13 11E 2287
S 13 5 E 2354
S 12 40 E 2421
82
33
40
68
15
84
14
8O
68
0 51
0 36
0 42
0 34
0 26
0 27
0 O8
0 66
0 9O
0 44
1771 05 S 381.87 E 1811 75 S 12 10 E
1836 22 S 398.66 E 1879
1901 83 S 415.20 E 1946
1968 02 S 431.77 E 2014
2034 46 S 448 11E 2083
2101 12 S 464 24 E 2151
2168.04 S 480 23 E 2220
2234.60 S 495 93 E 2288
2300.58 S 511 34 E 2356
2365.84 S 526 24 E 2423
O0 S 12 15 E
63 S 12 19 E
82 S 12 22 E
22 S 12 25 E
80 S 12 28 E
59 S 12 29 E
97 S 12 31E
72 S 12 32 E
66 S 12 32 E
5000 O0 4109 23 4021.84 41 30
5100
5200
5300
5400
5500
5600
5700
5800
5900
O0 4184
O0 4258
O0 4333
O0 4408
O0 4483
O0 4558
O0 4633
O0 4708
O0 4783
03 4096 64 41 41
77 4171
75 4246
50 4321
29 4395
11 4470
03 4545
07 4620
03 4695
38 41 27
36 41 31
11 41 38
90 41 34
72 41 31
64 41 21
68 41 28
64 41 16
S 12 21E 2487 98
S 11 49 E 2554
S 11 37 E 2620
S 11 22 E 2686
S 10 55 E 2753
S 10 19 E 2819
S 9 41E 2886
S 10 33 E 2952
S 11 23 E 3018
S 11 21E 3084
31
73
88
30
67
02
25
34
51
O. 21
0.40
0.32
O. 53
0.50
0.56
0.37
1.44
0.35
O. 29
2430.63 S 540 60 E 2490.02 S 12 32 E
2495.52 S 554
2560.58 S 567
2625.43 S 581
2690 59 S 594
2755 83 S 606
2821 17 S 617
2886 43 S 629
2951 28 S 641
3016 16 S 654
49 E 2556.38 S 12 32 E
96 E 2622.82 S 12 30 E
13 E 2688.98 S 12 29 E
02 E 2755.38 S 12 27 E
24 E 2821.72 S 12 24 E
73 E 2888.01 S 12 21E
13 E 2954.19 S 12 18 E
89 E 3020.28 S 12 16 E
96 E 3086.45 S 12 15 E
6000 O0 4858 06 4770 67 41 24
6100
6200
6300
6400
6500
6600
6700
6800
6900
O0 4933
O0 5007
O0 5081
O0 5155
O0 5230
O0 5304
O0 5379
O0 5453
O0 5527
14 4845
55 4920
23 4993
63 5068
33 5142
92 5217
36 5291
68 5366
92 5440
75 41 30
16 42 18
84 42 29
24 41 39
94 41 42
53 41 47
97 41 57
29 42 4
53 42 4
S 12 0 E 3150.61
S 13 16 E 3216.59
S 13 1 E 3283.32
S 13 24 E 3350.84
S 14 47 E 3417.49
S 14 52 E 3483.76
S 14 49 E 3550.15
S 14 53 E 3616.70
S 14 53 E 3683.40
S 14 55 E 3750.16
1 58
1 51
0 98
1 8O
0 42
0 46
0 33
0 14
0 23
0 14
3080 95 S 668 10 E 3152 56 S 12 14 E
3145
3210
3276
3341
3405
3469
3534
3598
3663
36 S 682
44 S 697
28 S 713
05 S 729
32 S 746
70 S 763
24 S 780
91S 798
66 S 815
74 E 3218
87 E 3285
18 E 3353
61E 3419
65 E 3486
70 E 3552
79 E 3619
O0 E 3686
17 E 3753
61 S 12 15 E
41 S 12 16 E
O1 S 12 17 E
79 S 12 19 E
21 S 12 22 E
76 S 12 25 E
46 S 12 27 E
32 S 12 3O E
25 S 12 33 E
7000 O0 5602.15 5514.76 42 3
7100
7200
7300
7400
7500
7600
7700
7800
7900
O0 5676.49 5589.10 41 53
O0 5750.83 5663.44 42 8
O0 5824 75 5737.36 42 34
O0 5898 56 5811.17 41 48
O0 5973 81 5886.42 41 3
O0 6049 15 5961.76 41 3
O0 6124 44 6037.05 41 17
O0 6199 67 6112.28 40 52
O0 6276 17 6188.78 39 28
S 15 2 E 3816.94
S 13 41 E 3883 63
S 12 52 E 3950 44
S 12 39 E 4017 72
S 11 46 E 4085 14
S 10 47 E 4150
S 10 2 E 4216
S 9 7 E 4282
S 7 45 E 4348
S 7 10 E 4412
99
74
55
40
72
0 18
1 75
0 46
0 53
2 45
0 59
0 62
0.81
1.67
1.44
3728 39 S 832 48 E 3820 20 S 12 35 E
3793 13 S 849 30 E 3887
3858 27 S 864 48 E 3953
3923 96 S 879 34 E 4021
3989 87 S 893 76 E 4088
4054 48 S 906 52 E 4154
4119 13 S 918.45 E 4220
4184 04 S 929.41 E 4286
4249.20 S 939.06 E 4351
4313.05 S 947.43 E 4415
05 S 12 37 E
93 S 12 38 E
28 S 12 38 E
75 S 12 38 E
58 S 12 36 E
29 S 12 34 E
02 S 12 31E
73 S 12 28 E
89 S 12 23 E
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: lO-APR-g2 PAGE 3
DATE OF SURVEY: 02-APR-1992
KELLY BUSHING ELEVATION: 87.39 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
8000 O0 6353.72 6266 33 39 9
8100
8200
8300
8400
8500
8600
8700
8800
8900
O0 6431.42 6344 03 38 43
O0 6509.00 6421 61 39 41
O0 6586 18 6498 79 39 17
O0 6663 85 6576 46 38 18
O0 6742 97 6655 58 37 46
O0 6821 66 6734.27 38 40
O0 6898 09 6810.70 41 31
O0 6972 69 6885.30 41 39
O0 7047 76 6960.37 41 24
9000 O0 7121 62 7034.23 43 29
9100
92O0
9300
9400
9500
9600
9700
9800
9900
O0 7193
O0 7266
O0 7340
O0 7414
O0 7487
O0 7561
O0 7638
O0 7715
O0 7793
75 7106.36 43 34
80 7179.41 42 51
47 7253 08 42 19
38 7326 99 42 19
99 7400 60 42 51
85 7474 46 41 16
33 7550 94 39 41
10 7627 71 40 2
07 7705 68 36 51
10000.00 7873.19 7785 80 37 1
10100.00 7952.76 7865
10200 O0 8031.71 7944
10300 O0 8110.16 8022
10400 O0 8188.25 8100
10500 O0 8266.21 8178
10600 O0 8344.41 8257
10700 O0 8423.75 8336
10800 O0 8502.94 8415
10900 O0 8583.82 8496
37 37 33
32 38 10
77 38 30
86 38 42
82 38 56
02 37 44
36 37 24
55 37 24
43 34 44
11000 O0 8666 42 8579.03 33 56
11100 O0 8748 43 8661.04 35 45
11200 O0 8830 01 8742.62 35 5
11300 O0 8911 86 8824.47 35 11
11400 O0 8993 62 8906.23 35 9
11500 O0 9075 43 8988.04 35 4
11600 O0 9157 33 9069.94 35 1
11669 O0 9213 84 9126.45 35 1
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEG MIN FEET
S 6 53 E 4475 75
S 6 26 E 4538
S 8 28 E 4601
S 6 47 E 4665
S 4 35 E 4727
S 4 42 E 4788
S 4 37 E 4850
S 6 45 E 4914
S 9 6 E 4980
S 9 41E 5047
S 9 8 E 5114 41
S 7 50 E 5183
S S 59 E 5251
S 8 22 E 5319
S 9 11E 5386
S 8 3 E 5454
S 10 5 E 5521
S 12 7 E 5586
S 11 13 E 5650
S 11 21E 5712
59
59
13
92
73
17
41
94
O0
63
80
28
62
29
65
06
12
69
DEG/IO0 FEET FEET FEET DEG MIN
0 74
0 62
I 11
1 65
2 13
1 28
2 48
2 57
1 65
I 48
2.03
2.23
0.89
2.87
0 88
0 72
4 72
0 72
0 28
2 73
4375 74 S 954 98 E 4478 74 S 12 19 E
4438
4500
4563
4626
4687
4748
4813
4879
4944
25 S 962
81S 970
81S 979
47 S 985
45 S 990
94 S 995
11S 1001
06 S 1010
19 S 1021
41E 4541
5O E 46O4
18 E 4667
50 E 473O
03 E 479O
17 E 4852
32 E 4916
52 E 4982
58 E 5048
39 S 12 14 E
25 S 12 10 E
67 S 12 7 E
26 S 12 2 E
86 S 11 56 E
O9 S 11 5O E
16 S 11 45 E
61 S 11 42 E
63 S 11 40 E
5010 70 S 1032 55 E 5115.99 S 11 39 E
5079
5146
5214
5280
5347
5414
5477
5540
5601
17 S 1042
99 S 1051
14 S 1058
63 S 1069
56 S 1079
22 S 1089
33 S 1102
10 S 1115
48 S 1127
95 E 5185.14 S 11 36 E
O1E 5253 20 S 11 32 E
83 E 5320 57 S 11 29 E
59 E 5387 86 S 11 27 E
71 E 5455 47 S 11 25 E
66 E 5522 79 S 11 23 E
59 E 5587 20 S 11 23 E
48 E 5651 28 S 11 23 E
71 E 5713 87 S 11 23 E
S 10 45 E 5772.52
S 10 45 E 5833.09
S 8 49 E 5894.47
S 6 13 E 5956.40
S 4 4 E 6018.61
S 2 16 E 6080.73
S 3 36 E 6142.51
S 3 8 E 6202.99
S 1 26 E 6263.45
S 4 22 E 6321.73
0 55
0 67
1 79
1 33
1 49
0 74
2 72
2 69
1 15
0 86
5660 23 S 1139 03 E 5773 70 S 11 23 E
5719
5780
5841
5903
5966
6028
6089
6150
6209
73 S 1150
18 S 1160
67 S 1169
87 S 1174
41S 1177
67 S 1180
41S 1184
43 S 1186
14 S 1189
38 E 5834
99 E 5895
O0 E 5957
6O E 6019
86 E 6081
71E 6143
69 E 6203
99 E 6263
78 E 6322
27 S 11 22 E
63 S 11 21E
49 S 11 19 E
58 S 11 15 E
56 S 11 10 E
2O S 11 5 E
58 S 11 1E
92 S 10 55 E
11 S 10 51E
S 3 3 E 6377.73
S 1 58 W 6434 08
S 2 53 W 6490 56
S 2 37 W 6546 50
S 1 16 W 6602 79
S 0 13 W 6659 23
S 0 5 E 6715 79
S 0 5 E 6754 75
I 37
0 53
0 91
0 67
0 78
I 22
0 O0
0 O0
6265 38 S 1193.49 E 6378.04 S 10 47 E
6322 58 S 1193.83 E 6434.30 S 10 42 E
6380 37 S 1191.60 E 6490.69 S 10 35 E
6437 73 S 1188.70 E 6546.56 S 10 28 E
6495 28 S 1186.75 E 6602.80 S 10 21 E
6552 78 S 1185.95 E 6659.24 S 10 16 E
6610 24 S 1186.00 E 6715.79 S 10 10 E
6649 82 S 1186.05 E 6754.77 S 10 7 E
COMPUTATION DATE: 10-APR-g2
PAGE 4
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 02-APR-1992
KELLY BUSHING ELEVATION: 87.39 FT
ENGINEER: G. JOHNSON
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0 O0 -87 39 0 0 N 0 0 E
O0 996 66 909
O0 1902 30 1814
O0 2627 62 2540
O0 3374 65 3287
O0 4109 23 4021
O0 4858 06 4770
O0 5602 15 5514
O0 6353 72 6266
O0 7121 62 7034
'O O0
27 11 30 S 12 52 E 51
91 36 9 S 7 48 E 461
23 42 48 S 12 41 E 1147
26 42 20 S 14 51 E 1810
84 41 30 S 12 21 E 2487
67 41 24 S 12 0 E 3150
76 42 3 S 15 2 E 3816
33 39 9 S 6 53 E 4475
23 43 29 S 9 8 E 5114
21
55
93
70
98
61
94
75
41
0 O0
3
6
0
0
0
1
0
0
2
0 O0 n
06 48
89 452
58 1127
51 1771
21 2430
58 3080
18 3728
74 4375
03 5010
0 O0 E
49 S 19
86 S 89
20 S 217
05 S 381
63 S 540
95 S 668
39 S 832
74 S 954
70 S 1032
000 N 0 0 E
65 E 52
51E 461
59 E 1148
87 E 1811
60 E 2490
10 E 3152
48 E 3820
98 E 4478
55 E 5115
32 S 22 4 E
62 S 11 11E
O1 S 10 56 E
75 S 12 10 E
02 S 12 32 E
56 S 12 14 E
2O S 12 35 E
74 S 12 19 E
99 S 11 39 E
10000.00 7873.19 7785.80 37 1 S 10 45 E 5772.52
11000.00 8666.42 8579.03 33 56 S 3 3 E 6377.73
11669.00 9213.84 9126.45 35 1 S 0 5 E 6754.75
0.55 5660.23 S 1139.03 E 5773.70 S 11 23 E
1.37 6265.38 S 1193.49 E 6378.04 S 10 47 E
0.00 6649.82 S 1186.05 E 6754.77 S 10 7 E
COMPUTATION DATE' lO-APR-92
PAGE 5
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY' 02-APR-1992
KELLY BUSHING I::IEVATION' 87,39 FT
ENGINEER' G. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURE[) VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGU~R COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOLFTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG
0 O0
87 39
187 39
287 40
387 40
487 41
587 44
687 57
788 07
889 03
0 O0
87 39
187 39
287 39
387 39
487 39
587 39
687 39
787 39
887.39
-87 39
0 O0
100 O0
200 O0
300 O0
400 O0
500 O0
600 O0
700 O0
800 O0
0 0 N 0 0 E
0 24 N 78 27 E
0 23 N 85 26 E
0 30 S 83 12 E
0 46 S 69 58 E
I 2 S 53 32 E
I 51 S 36 4 E
4 6 S 21 57 E
6 55 S 16 37 E
8 48 S 15 18 E
0 O0
0 12
0 14
0 29
0 76
I 67
3 67
8 39
18 16
31 91
0 O0
0 22
0 35
0 23
0 46
0 40
1 27
3 79
1 54
i 17
O00N
0 04S
0 05 N
0 03 N
0255
0 945
2 68S
7.08 S
16.44 S
29.75 S
0 O0 E
0 42 E
I 08 E
I 83 E
2 87 E
4 19 E
5 80 E
8 02 E
11 12 E
14 88 E
0 O0 N 0 0
0
1
1
2
4
6
10
19
33
42 S 84 16
08 N 87 20
83 N 88 57
88 S 85 0
29 S 77 19
39 S 65 11
70 S 48 33
85 S 34 5
26 S 26 35
990 55
1093
1198
1307
1415
1523
1632
1743
1861
1981
987 39
33 1087
63 1187
03 1287
68 1387
81 1487
99 1587
80 1687
18 1787
66 1887
900.00 11 10
39 1000.00 15 37
39 1100.00 21 3
39 1200 O0 23 33
39 1300 O0 22 23
39 1400 O0 22 52
39 1500 O0 24 8
39 1600 O0 28 15
39 1700 O0 33 23
39 1800 O0 35 3
S 13 16 E 49.35
S 9 41E 72.96
S 10 54 E 105.81
S 13 50 E 147.58
S 14 2 E 189.97
S 11 11E 231.06
S 8 22 E 274.85
S 6 45 E 322.46
S 7 32 E 383.77
S 7 43 E 450.89
4.45
4 27
4 95
0 58
0 73
2 55
I 16
6 64
0 73
4 87
46.67 S
69.84 S
102.24 S
143.01S
184 23 S
224 36 S
267 52 S
314 79 S
375 68 S
442 28 S
19 23 E
23
29
38
48
57
65
71
79
88
50.48 S 22 24 E
80 E 73.78 S 18 49 E
28 E 106.35 S 15 59 E
55 E 148.11 S 15 S E
82 E 190.59 S 14 51E
83 E 231.69 S 14 27 E
25 E 275.36 S 13 42 E
41E 322.79 S 12 47 E
15 E 383.93 S 11 54 E
07 E 450.96 S 11 16 E
2112 46 1987 39 1900 O0 45 17
2259
2400
2537
2674
2809
2945
3081
3218
3353
03 2087
75 2187
92 2287
40 2387
44 2487
20 2587
74 2687
46 2787
35 2887
39 2000
39 2100
39 2200
39 2300
39 24O0
39 2500
39 2600
39 2700
39 2800
S 7 18 E
O0 47 13 S 7 3 E 641
O0 43 4 S 8 47 E 742
O0 43 21 S 14 0 E 835
O0 42 10 S 14 15 E 928
O0 42 20 S 13 42 E 1019
O0 42 45 S 12 57 E 1110
O0 43 6 S 12 31E 1203
O0 42 39 S 13 44 E 1296
O0 41 14 S 13 44 E 1387
534 79
79
04
88
51
O7
76
65
76
10
7 32
0 62
i O3
1 68
0 21
0 66
0 37
0 12
0 42
0 59
525 53 S
631
731
823
913
1001
1090
1181
1272
1360
99 17 E 534.81 S 10 41 E
86 S 112
30 S 125
51S 143
52 S 166
56 S 188
92 S 209
63 S 229
50 S 250
40 S 272
50 E 641.79 S 10 6 E
89 E 742.06 S 9 46 E
36 E 835.90 S 9 53 E
21 E 928 51 S 10 19 E
22 E 1019 10 S 10 39 E
34 E 1110 83 S 10 52 E
74 E 1203 76 S 11 0 E
56 E 1296 93 S 11 8 E
17 E 1387 36 S 11 19 E
3485 90 2987.39 2900 O0 40 46
3618
3749
3882
4017
4152
4289
4426
4563
4701
08 3087.39 3000 O0 40 42
66 3187.39 3100 O0 40 23
12 3287.39 3200 O0 41 52
23 3387.39 3300 O0 42 20
54 3487.39 3400 O0 42 35
09 3587.39 3500.00 43 7
22 3687.39 3600.00 43 15
86 3787.39 3700.00 43 29
10 3887.39 3800.00 42 46
S 14 38 E 1473 92
S 15 39 E 1560
S 15 0 E 1645
S 15 15 E 1731
S 14 42 E 1822
S 14 10 E 1913
S 13 58 E 2005
S 13 39 E 2O99
S 13 25 E 2194
S 13 11E 2287
02
19
74
27
20
96
61
02
89
1 53
0 44
0 40
1 35
0 64
0 74
0 31
0 16
0 29
0 64
1444 85 S 293 05 E 1474 27 S 11 28 E
1528
1610
1694
1782
1870
1960
2051
2143
2235
20 S 316
66 S 338
55 S 361
27 S 384
60 S 407
78 S 429
91S 452
85 S 474
33 S 496
O0 E 1560
68 E 1645
15 E 1732
83 E 1823
33 E 1914
97 E 2007
35 E 2101
47 E 2195
10 E 2289
53 S 11 41E
88 S 11 52 E
60 S 12 2 E
34 S 12 11E
44 S 12 17 E
37 S 12 22 E
18 S 12 26 E
73 S 12 29 E
72 S 12 31E
COMPUTATION DATE: lO-APR-92 PAGE 6
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 02-APR-lg92
KELLY BUSHING ELEVATION' 87.39 FT
ENGINEER' G. JOHNSON
INTERPOLATE/) VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
4836.83 3987.39 3900.00 42 5
4970 84 4087.39 4000.00 41 30
5104
5238
5371
5505
5639
5772
5905
6039
50 4187.39 4100.00 41 41
17 4287 39 4200.00 41 24
75 4387 39 4300.00 41 40
47 4487 39 4400.00 41 35
11 4587 39 4500.00 41 32
41 4687 39 4600.00 41 24
80 4787 39 4700.00 41 18
07 4887 39 4800.00 41 19
S 12 56 E 2379 54
S 12 26 E 2468
S 11 48 E 2557
S 11 31E 2645
S 11 7 E 2734
S 10 18 E 2823
S 9 42 E 2911
S 11 21E 3OOO
S 11 20 E 3088
S 12 49 E 3176
67
30
97
52
30
95
09
34
41
O. 97
0.16
0.40
0 15
0 47
0 62
0 34
0 16
0 36
I 06
2324.71S 516.91E 2381.48 S 12 32 E
2411.75 S 536.45 E 2470.70 S 12 32 E
2498.45 S 555.10 E 2559.38 S 12 32 E
2585.32 S 573.02 E 2648.06 S 12 30 E
2672.16 S 590.43 E 2736 61 S 12 28 E
2759.40 S 606.89 E 2825 35 S 12 24 E
2846.74 S 622.09 E 2913 92 S 12 20 E
2933.38 S 638.29 E 3002 02 S 12 17 E
3019.92 S 655.71 E 3090 28 S 12 15 E
3106.17 S 673.63 E 3178 38 S 12 14 E
6172 80 4987 39 4900.00 42 4
6308
6442
6576
6710
6845
6980
7114
7249
7384
33 5087
53 5187
50 5287
79 5387
41 5487
12 5587
64 5687
38 5787
96 5887
39 5000 O0 42 23
39 5100
39 5200
39 5300
39 5400
39 5500
39 5600
39 5700
39 5800
O0 41 42
O0 41 46
O0 41 58
O0 42 3
O0 42 4
O0 41 52
O0 42 19
O0 42 6
S 13 2 E 3265 08
S 13 33 E 3356
S 14 52 E 3445
S 14 49 E 3534
S 14 54 E 3623
S 14 50 E 3713
S 15 I E 3803
S 13 20 E 3893
S 12 45 E 3983
S 11 59 E 4075
44
69
55
89
71
67
39
60
O8
0 75
2 O1
0 95
0 28
0 14
0 11
0 14
I 16
0 44
2 18
3192 64 S 693 76 E 3267 15 S 12 16 E
3281
3368
3454
3541
3628
3715
3802
3890
3980
74 S 714
40 S 736
56 S 759
21S 782
31S 805
53 S 829
62 S 851
64 S 871
02 S 891
49 E 3358 62 S 12 17 E
85 E 3448 05 S 12 20 E
70 E 3537 11 S 12 24 E
64 E 3626 67 S 12 28 E
79 E 3716 71 S 12 31E
02 E 3806 89 S 12 35 E
60 E 3896 81 S 12 37 E
84 E 3987 :~3 S 12 38 E
67 E 4078.68 S 12 38 E
7518.02 5987.39 5900 O0 41 7
7650.75 6087.39 6000 O0 41 10
7783 73 6187.39 6100 O0 41 3
7914 52 6287.39 6200 O0 39 19
8043 43 6387 39 6300 O0 39 7
8171 98 6487 39 6400 O0 39 22
8301 57 6587 39 6500 O0 39 17
8429 85 6687 39 6600.00 37 39
8556 32 6787 39 6700.00 38 5
8685 74 6887 39 6800.00 41 13
S 10 41E 4162 82
S 9 37 E 4250
S 7 56 E 4337
S 7 1E 4421
S 6 55 E 4503
S 7 59 E 4583
S 6 45 E 4666
S 4 3 E 4746
S 4 50 E 4823
S 6 21E 4905
11
73
93
13
77
12
17
21
01
0.76
O. 65
1.41
1.56
O. 92
2.45
1.62
1.75
0.72
3.03
4066 10 S 908 72 E 4166.41 S 12 36 E
4152 02 S 924
4238 63 S 937
4322 21S 948
4402 96 S 958
4483 16 S 967
4564 79 S 979
4644.77 S 986
4721.95 S 992
4803.75 S 1000.25 E 4906
14 E 4253 62 S 12 33 E
59 E 4341
58 E 4425
29 E 4506
95 E 4586
3O E 4668
87 E 4748
95 E 4825
O9 S 12 28 E
O7 S 12 23 E
O4 S 12 17 E
46 S 12 11E
66 S 12 6 E
45 S 12 0 E
22 S 11 53 E
78 S 11 46 E
8819 65 6987 39 6900 O0 41 30
8953
9091
9228
9363
9499
9633
9763
9892
10017
22 7087
21 7187
05 7287
48 7387
18 7487
70 7587
85 7687
89 7787
79 7887
39 7000
39 7100
39 7200
39 7300
39 7400
39 7500
39 7600
39 7700
39 7800
O0 42 25
O0 43 42
O0 42 40
O0 42 22
O0 42 51
O0 40 10
O0 39 53
O0 37 3
O0 37 6
S 9 29 E 4993 98
S 9 20 E 5082
S 8 3 E 5177
S 5 53 E 5270
S 9 27 E 5362
S 8 3 E 5453
S 11 31E 5543
S 11 26 E 5626
S 11 23 E 5708
S 10 48 E 5783
53
58
8O
03
73
64
go
41
24
I 65
2 37
2 14
0 86
0 61
0 73
3 14
0 7O
3 35
0 64
4891 93 S 1012.61 E 4995 64 S 11 42 E
4979
5073
5165
5256
5347
5435
5517
5597
5670
23 S 1027.44 E 5084
17 S 1042.12 E 5179
93 S 1052 97 E 5272
36 S 1065 60 E 5363
01S 1079 63 E 5454
82 S 1093 77 E 5544
33 S 1110 92 E 5628
28 S 1126 87 E 5709
77 S 1141 04 E 5784
13 S 11 4O E
10 S 11 36 E
16 S 11 31E
28 S 11 28 E
92 S 11 25 E
77 S 11 23 E
07 S 11 23 E
59 S 11 23 E
42 S 11 23 E
COMPUTATION DATE: lO-APR-92
PAGE 7
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: 02-APR-1992
KELLY BUSHING ELEVATION: 87.39 FT
ENGINEER: O. JOHNSON
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
-rRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGU~R COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMLFFH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMLFFH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/100 FEET FEET FEET DEG
10143 76 7987 39 7900 O0 37 50 S 10 11 E 5859 84
10270
10398
10527
10654
10780
10904
11025
11147
11270
93 8087
90 8187
22 8287
22 8387
40 8487
35 8587
30 8687
86 8787
07 8887
39 8000
39 8100
39 8200
39 8300
39 8400
39 8500
39 8600
39 8700
39 8800
O0 38 25 S 6 52 E 5938
O0 38 42 S 4 5 E 6017
O0 38 54 S 2 16 E 6097
O0 37 28 S 3 52 E 6175
O0 37 38 S I 34 E 6251
O0 34 42 S 4 23 E 6324
O0 34 12 S I 47 E 6391
O0 35 12 S 2 2 W 6461
O0 35 8 S 2 52 W 6529
1 42 5746 03 S 1155 25 E 5861 O1 S 11 22 E
35 1
92
67 0
36 0
65
19 0
77 4
26
70 0
63 5823
49 5903
61 5983
66 6061
84 6138
83 6211
60 6279
51 6350
49 6420
70 S 1166
18 S 1174
50 S 1178
65 S 1182
50 S 1186
61S 1189
53 S 1194
36 S 1192
51S 1189
95 E 5939
55 E 6018
53 E 6098
95 E 6176
68 E 6252
97 E 6324
11E 6392
91E 6461
53 E 6529
47 S 11 20 E
90 S 11 15 E
46 S 11 9 E
O0 S 11 3 E
15 S 10 56 E
56 S 10 51E
06 S 10 46 E
43 S 10 38 E
78 S 10 30 E
11392.38 8987.39 8900.00 35 10 S 1 21W 6598.48
11514.61 9087.39 9000.00 3S 0 S 0 I W 6667,49
11636.71 9187.39 9100.00 35 I S 0 5 E 6736.52
11669.00 9213.84 9126.45 35 I S 0 5 E 6754.75
0.63 6490.89 S 1186.85 E 6598.50 S 10 22 E
2.74 6561.17 S 1185.93 E 6667.49 S 10 15 E
0.00 6631.30 S 1186.03 E 6736.52 S 10 8 E
0.00 6649.82 S 1186.05 E 6754.77 S 10 7 E
COMPUTATION DATE' lO-APR-g2 PAGE 8
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY' 02-APR-1992
KELLY BUSHING ELEVATION' 87.39 FT
ENGINEER' G. JOHNSON
INTERPOLATED VALUES FOR CHOSEN HORIZONS
MARKER
TOP 5 1/2" CASING
BOTTOM 7 6/8" CASING
GCT LAST READING
BOq-FOM 6 1/2" CASING
SURFACE LOCATION = 982' FNL & 1926' FWL, SEC19 TllN R12E
MEASURED DEPTH
BELOW KB
TVD
FROM KB SUB-SEA
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
10739.00 8454.65 8367.26
11012.00 8676.37 8588.98
11520.00 9091,80 9004.41
11664.00 9209.74 9122.35
11664.00 9209.75 9122.36
6113.18 S 1185.80 E
6272.08 S 1193.82 E
6564.34 S 1185.95 E
6646.95 S 1186.05 E
6646,96 S 1186,05 E
BP EXPLORATION
Z-16 (32-30-11-12)
PRUDHOE BAY
NORTH SLOPE, ALASKA
MARKER
COMPUTATION DATE: lO-APR-g2 PAGE 9
DATE OF SURVEY: 02-APR-1992
KELLY BUSHING ELEVATION: 87.39 FT
ENGINEER: G. JOHNSON
************ STRATIGRAPHIC SUMMARY
SURFACE LOCATION = 982' FNL & 1926' FWL, SEC19 T11N R12E
MEASURED DEPTH TVD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST
11664.00 9209.75 9122.36 6646.96 S 1186.05 E
FINAL WELL LOCATION AT TD:
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET DEG MIN
11669.00 9213.84 9126.45 6754.77 S 10 7 E
DIRECTIONAL SURVEY
COMPANY
BP EXPLORATION
FIELD PRUDHOE BAY
Z-16 (32-30-11-12)
COUNTRY USA
RUN ONE
DATE LOGGED 02 - APR - 92
DEPTH UNIT FEET
REFERENCE 92248
M InlrpretMlons are opinion8 based on in/emnees h'om eleClTiOal or other meaaJremerl~ and w~ canno~ ~ do mX
guarantee I~e am~ura~--y or ~orreclnes~ M any Wrpretal~on~ an4 we shall n~, except In the r.4ae o1' grosa or ~
neglgenee off our part. be Ilal)le or responMI)le ror any lose, ooet~, damagee or exT)®flsea InctMTed or i~BtaJn4(:l I]y
anyone reaJ~ng Imm any Inte~pretal~on made by any of our o~lcem, agerl~ or employees These Inte~prltal~om am
~ ~A)}ec~ t~ our General Terms and CM3dll~on~ a~ .t ou~ I~ our current p~ ~edule,
WELL' Z-16 (32-30-11-12)
(982'FNL,1926'FWL,SEC 19,T11N,R12E)
HORIZONTAL PROJECTION
2000
'-.~---~--.h..! ...... ~--.i---!---~ ...... ~---!'--~-'-~-' :::: :::: :::: :::: :::: "':'"
...F.F.i...i ....... !...~..T..! ...... ;..?...;...~ ............ ...... ?..~...~...; ...... r..~...?..~ ................................................................................................................
"'?"!"'F"~ ..... !'"F"F'? ...... ?!'"!'"!"'"'?'!'"!""; ....... !"'?!'"! ...... F"F"F"! ...... F"!"'?'~ ...... !"'F"i'"~ ...... !'"F"!'"! ...... !"'F"!'"~ ...... :'"~'":'": ...... :'":'"~'": ...... :'":'":'"~'"!'":'":'-:"': ...... :--~---r-: .........
;~:: ::::~:::~ :::: :~:; :::: :::: :::: :::: :::: :::; ~:~:,:::: ::::
.... ~.: ..... ~..~ ~ ........ : ......... ~ .: ....... ~ ...... :: ......
:;:: :::: :::;.;::: :::: :::; ;::: :;;~ :;~: ;::: :;:: ::~: ;:;: ;::: ;:::
'-'~---r--~---~ ...... :-.-:.--:---: ...... :-.-:---:---: ...... :"':'"~"':'""":'":'":'": ...... :"'~'":'": ...... !'"!"'!'"~ ...... F"!'"!'"! ...... F"F"F"! ...... ?'F"!'"F','"F"~'"F"! ...... !'"F"F"! ...... !-'!'"!'"! ..... ?"F-!-~ ...... F-F-F-! .....
........ - .... -'i'"!"i"i ...... i"i"i'"~'' ........................... "'?"?"~'"~ ...... !'",'"~"? ...... ?"??"~ ...... ~"'?"!"'?"
.-:...:.--:---~ ....... :---~---~---~ ...... :.--~.-.~...t ...... :..-:...:.-.: ...... :...t-..~-..~ ..... :...r--:-..~-..
~;:; ;~;: ;:;; :::; :::: ;;:: :::; :::: :::: ..................... : ......
· 'i"i"i"i ...... ~"+'+"~ ...... h--~.--~---! ..... ~--+.-~-.-! ...... i--+-+--! ...... ~---~--+--i ...... ~.--~--->---~ ...... i--+--i---~ ...... ~--+--~---~ ...... i---~---i---~...,..-i...i...i...i ...... i-.-i...i--.i ..... i-..i...i.-.i ...... !..-i.-i-.~ ......
...... F"!'"F"~ ...... ?i"'!'"~ ...... F"'F"?'~ ...... F"F"i'"~ ...... F"!'"?¢ ....... F"!"?"~ ...... F"!'"!'"~ ...... ?'?"?"~ ...... ~'--~-..i-.-h.,!.--h--~-..~...i ..... ~---i---h-.~ ..... ~...h--i-..i ...... i.-.~..-i.-.~ ....... ~.o4-.i.-~ .......
"'!'"i"i'"! ...... i"i"'~"i ...... h"hi"i ..... i"i"i-i ...... ?'~'"?"~ ..... ?"?!"'! ...... ~'"!"'!'"!'"."i'"i"i'"! ...... i'"~'"!'"i ...... ............................ ~"'~"+"~ ....... ~-..~...~..-i ...... ~-.-~..+-.~ ...... ~-+->--~ ...... ~--~-+-> ....... !-+-~-.! ......
..;...~...:...: ...... :...L..: .... : ~ ..... :...~...L..; ....... ~ :...;...~. . ~-..: .... ~ ..... :...;...:...: ..... :..: ....... ;...; ...... ;...:...~...~ ..... :..;...~...: ...... :...:...;...;...
:::; ;: ."'":'":"':"'. ...... . ......... -' ::: ::::1:::~ ;:;: :::::~:: ~:;: :::: ;::: ;;:: ;::;
· -.~..-~-.-~.-.i ...... c...:...L..! ...... ,...,...,...,...,...,...,...,..., ...... :...2...:...: ...... ,...,...,...,..,...,...,...,..., ....... :...:...:...~ ...... ,...,...,...,...,...,...,...,..., ...... ~...:...:...: ..... :...L..}...: ....... :...c...:...; ...... ;...:...:...~ ...... :...;...:...: ......
· "='"~.--f---~ ...... ~.--~--.:--.~ ...... ~---:--.¢.--~ ...... :---r.-.r-.-: ...... :-'-:--':'--= · ................................
~ ::: :;::~::; :::: ::;: :;:: :::: :::: :::: :;:: :::: :;:: :::: :::: ::::
i~!! .... :!!: i ......................................~.i...!...L..i ...... L..L..L..L..
· ..!...??.-.! ...... ?..!...?.-!.-,...?.:...:...: ....... :..-;--.:-.-: ...... ;..-:...:---: ...... ;.--;:: ;::: :::: ::;:
"F-!"'F"~ ..... !"'!"'!"'?'~'"!'"~"'~'"~ ....... Y"!'"F"~ ...... !'"!'"?! ...... !"'F"F"! ...... F"F'?"~ ....... !'"!'"!'"~ ...... !'"F"F"~ ..... !"'!'"F"~ ....
5-'i--'i'--~ ...... i.--!.--~-.-~ ...... i---i"-!---i ...... ?--i'"i--i ...... i'--i--'i---i ...... !---U---i ..... i--i--i---i ...... h!---!---! .... ~-'-U:-~'--!--i---i--'i ...... i---i.+-i.-..-.i--.!..-~.--i ...... hi-..i-.-i ...... ?-"!"i ...... ?-'! ......
'":.":"'~"': ..... :'-':'":"': ...... ~'":"':'-': ..... :"-:'":-": ...... :--':---:---:'"F--:---:---:---: ...... t-..:--.:.-.: ...... :.--:---:-..: ..... ~.-.:-:.-.: ...... :-.-:.--:-.-: ...... :...~...:...: ...... :---:...:.-.: ...... ~...:.--:..-: ...... :---~-..~-.: ...... :--:.--:..-: ...... :--:..-:
· --!...i--.i--i---:-..i.-i..-h-! ...... i---i---i.--i ...... i---!---i---i ...... i..i-..!---i ...... i---!-.-i---i ...... i--.i-.-i..-i ...... i---~.-.i--.i-..?-i--i.-'~i ...... i..-~.-i.--i ...... i--i-.i..-~ ...... i-.-!--.i.-i-..:...~.--i-.-~-..~ ...... !--.i--i-.?-.~-+-i-.i ....... hi-i-+-
· --f.--~ ...... ! ....... i ...... i.-i ......... h-i ......... i--i ...... i--.t ...... f ............ i ..................... i .................. i...i---f ...... ~-i ............ ~.--! ......... i ...... i ............ i..-! ...... i ......... i ...... !...f.-i...i ..... f ...... i ............ i ......
.o-~---~..-~.--~ ...... ~---;.--:---~ ...... ~---:---:---:--..-~---:---;-.-:-..i--.~--.~-.-L--; ...... :--.;.--;-.-: ...... :.--:---;---:.-----:---:---:---:--.;---:.--:---: ..... ''--;...i---:--.:--.:-..; ...... :...:...L..:......~...~...~...~ ...... h..L..~...: ..... Lo.L..:.-: ......
"'?"~'"!'"~ ...... ~'"~"'?~ ...... ?'!"'?"~'"~'"~'"?"! ....... ?"?"~ ?"!"'~'"~ ...... ~'"?'?"?"~"'???"~ ....... ~"?'"?~~..~.~...`...~..."..".....~...~...~..."...."..~...~,..~......~...~...~...~.....?~..~??"??"?"???."".?"?"?."?"??. ZE]]]ZE]
'--i-'i-'i'--! ...... i-'i-'i--i ...... i-'i-'i'--i .... i'-'i---!--i ....... !-'i-'i"i ...... h'i-'-!'-'! ...... i-'i-'i-i ..... i"'i---f'"~ ....... i---!--i--~ ....... :~::,:~:: : ............. ~
.--i--.,--i.-i ...... i--i--i--i ...... h-i--i--i ..... i---h--i-.i ....... !-..!---i---! ...... i--i--i--i ...... i--i-.-i--i ..... i--i.-i--i ....... i-.i--i--.h, ti-'-r~O~-!".i--i"i ...... i--i.-i.-.! ..... i..i..i..i ...... i-..h'.i..i ..... i-.i..i..i ...... i---~.--i.-i.--i
"'r'":"'='": ...... :'":"'~'": ...... :'":"'='": ..... ~"'~'"~"': ...... :"'='"~'": ...... ~"'?"?"~ ...... ~'"t'"t'"¢ ..... !'"!"'!'"~ ...... :'"~'":'": ..... ' .......................................................
..-i...i-..i.--i ...... i...i...i.-.i ...... i-.-i-..i.--i ..... i---i..-~-.-i ...... i.-.~-.-~-.-i ...... i---~.-+..~ ...... ~--.i-.-i---i ..... ~---~--+--~ ...... i...i...i.-~....~
"'i'"i"'i'"i ...... i"-i'"i'"i ...... i'"i'"i'"i'":'--i"'i"'i"'i ...... !'"i'"i"'i ...... i"'i'-'i'"i ...... i'"i"'i'"i ..... i'"!'"i'"i ....... ?"?'-?'-,-'-i-~i~m~i'-'i-"i'-'i ...... !-"i'"i'"!'";"'i'-'i'"i-"i ...... i'"i'"i'"i ...... i-'i"'i-'i ......
"'!'"?!'"! ...... F"!'"F"! ...... ~'"F"!'"~ ...... !"'F"!'"? ...... F"!'"F"! ...... !"'?F"~ ...... ?F"Y"~ ...... !'"!'"!'"! ...... ?Y"!'"~ ...... :"'F":'"; ...... !'"!'"F"~ ..... i'"!'"!"'i"r"F"!'"!'"! ...... F"F-?~ ...... ~-'~-'i-'i ......
...~--.~...:-..: ...... :.--:...~.-.:..-'.-.:.-.:..-:...: ...... :...1...:...: ...... :...:...:..-: ...... :...:.-.:---: ...... :-..:.--;.-.: ...... :...;...;...; ...... ~...~---~--.~.--~.--~...i ....... : ...... :.-.r--t---: ..... ~.-.:...~-..~ ...... r...~---~..-: ...... :-..:--~-.: ....... :--:.-.:--: ......
"'i'"?F"~ ...... !"'F'F"F'i'''?r°'?~ ....... ?!'"!'"! ...... ?'?F'i ...... F'?F'!'"~"'F'F"F'F'~'"F'F'!'"i ...... !'"F'F"~ ....... FT";'"i ...... i'"F'!'"~ ....... !"T'T"i ....... F'T'T"~ ...... i-T-Fi ...... i-7-!-! ......
["~"7'i'"i ...... i"'?'T"! ...... !"T'T! ..... i"T'T"i ...... i"'i'"!'"i ...... i'"!"7'i ...... ........ ~"'~'"~'"~ ....... i'"!'"!'"i ...... i"'i'"i'"i ..... i'"i!~'''~'''~''';::,. ..... ~,,:~'"~'"?"~ ...... ,,~?'?'~ ....... ::,:~-'~-'~-'~ ...... ,~:,~?'*-':-'~-?-~-'~-'~-'
'":'"~'"*'": ...... F"?'F"~ ...... F"F"F"~ ...... ?'F"!'"! ...... ~'"F"!'"! ...... !"?"F"! ...... F'?'"!'"! ...... F"!'"?~ ...... !"'!'"F"! ...... F"!'"Y"! ...... !"'?"F"[ ..... !'"!'"!'"! ...... !'"!'"i'"[ ...... F"!'-F-~ ...... !-'F-F-! ..... F'?'?°°?-
WELL' Z-16 (32-30-11-12)
(982'FNL,1926'FWL,SEC 19,T11N,R12E)
VERTICAL PROJECTION
-~ -~ 0 0 ~ ,~ ~0(0 80(0) l~ i ~
WEST EZLEEN/Z-16
500292224500
0,00
11036,00
CONPUTATZON DATE:
022692
TRUE SUB-SEA
MEASD VERTZCAL VERTZCAL
DEPTH DEPTH DEPTH
0 ,00
396 395,99
573 572,93
753 752,46
938 935,63
1127 1119,28
1318 1298,35
1505 1470,16
1695 1643,68
1886 1809,92
2075 1958,93
2391 2191,52
27O5 2422.34
2922 258.2,46
3250 2824,28
3597 3084,2!
3881 3297,55
4194 3529,46
4517 3766,26
4822 3990,94
5135 4224,82
5447 4459,03
5760 4694,36
6074 4930,61
6358 5143,81
6671 5378.05
6984 5611,93
7297 5844,35
7578 6054,30
7893 6295,44
SP__JF~RRY-SUN DRTLLTNG SERVTCES
ANCHORAGE ALASKA
8202 6534.04
8519 6780,44
8834 7022,98
9148 7256,85
94.65 7490,38
PAGE
DATE OF SURVEY: 022592
MWD SURVEY
JOB NUMBER: AK-MW-20009
KELLY BUSHZNG ELEV. = 90.00
OPERATOR: BP EXPLORATZON ZNC
FT.
COURS COURSE D
ZNCLN DZRECTZON
DG MN DEGREES DG/
LS TOTAL
RECTANGULAR COORDZNATES
100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
-90.00
305,99
482,93
66'2,46
845,63
0 0 N ,00 E ,00
0 42 S 81,30 E ,18
1 47 S 38,40 E ,78
6 11 S 18,20 E 2,53
9 48 S 13,20 E 1,98
.OON .OOE ,00
,373 2,39E ,82
2,713 5,19E 3,66
14,163 9,98E 15,83
38,993 16,70E 41,49
1029
1208
1380
1553
1719
,28
,35
,16
,68
,92
17 12 S 9.00 E 3.95
23 23 S 13.90 E 3.36
23 6 S 11.80 E .47
25 0 S 6,70 E 1.48
33 47 S 9.00 E 4,64
82,313 24.75E
147,093 38,30E
219,043 54,72E
295,423 67,03E
388,163 80,07E
85.55
151.72
2~ 50
302,81
396,32
1868
2101
2332
2492
2734
,93
,52
,34
,46
,28
42 0 S 9,20 E 4,34
43 12 S 10,80 E ,51
42 12 S 15,40 E 1,04
42 42 S 14,10 E ,47
42 17 S 14,60 E ,16
502,703 98.44E
713,303 135,61E
920,603 183.77E
1062,233 221,05E
1276,913 275,96E
512.24
726,06
938,76
1084,93
1306,19
2994
3207
3439
3676
3900
,21
,55
.46
,26
,94
40 42 S 18,50 E ,88 1497,253 341.31E
41 54 S 16,80 E ,58 1675,853 398,10E
42 30 S 12,90 E ,86 1879,003 451,92E
43 12 S 13,90 E ,30 2092,673 502.84E
41 54 S 13,60 E ,43 2293,003 551,87E
1535.02
1721.25
1930.98
2150.47
2356.50
4134
4369
4604
4840
5053
,82
,03
,36
,61
,81
41 24 S 11,50 E ,47
41 17 S 9,70 E ,38
41 12 S 11,50 E .38
41 12 S 13,20 E ,36
41 30 S 14,50 E ,32
2496,003 597.08E
2698,583 634.99E
2901,413 672,95E
3103,433 717.18E
3285,593 762.10E
2564.42
2770.5t
2976.85
3183.61
3371.02
5288
5521
5754
5964
6205
,05
,93
,35
,30
,44
41 35 S 15,00 E ,11 3486.353 814.95E
41 42 S 15,20 E ,05 3687,183 869.14E
42 24 S 12.50 E ,62 3890.673 9!9,28E
40 54 S 10,30 E ,75 4073,683 956.23E
39 12 S 7,30 E ,82 4273,913 987,33E
3578.23
3785,75
3995,1!
4181,80
4384,26
6444
6690
6932
7166
7400
,04 39 42 S 9,70 E ,52
,44 38 17 S .5,30 E ,98
,98 41 0 S 8,70 E 1,10
,85 42 42' S 6,70 E ,69
,38 42 24 S 6,60.E ,10
4468.043 1016,36E
4665.703 1042.50E
4865,103 1067,15E
5072,663 1095.16E
5285,583 1119,98E
4580.34
4779. o°2
4979.71
5188.76
5402.45
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
WEST EILEEN/Z-16
500292224500
0,00
11036,OO
COMPUTATION DATE:
022692
DATE OF SURVEY' 022592
MWD SURVEY
JOB NUMBER: AK-MW-20009
KELLY BUSHING ELEV, = 90,00
OPERATOR: BP EXPLORATION ZNC
FT,
TRUE SUB-SEA COURS COURSE
MEASD VERTICAL VERTICAL ZNCLN DIRECTION
DEPTH DEPTH DEPTH DG MN DEGREES
DLS TOTAL
RECTANGULAR COORDINATES
DG./IO0 NORTH/SOUTH EAST/WEST
VERT.
SECT,
975'1 7706,26 7616,26 39 35 S 11,50 E 1,49 5470,78S 1149,25E
10029 7924,72 7834,72 36 47 S 9,20 E 1,13 5639,84S 1180.24E
10278 8122,38 8032,38 38 5 S 7,30 E ,70 5789,65S 1201,92E
10468 8271,23 8181,23 38 47 S 1,50 E 1,93 5907,34S 1210,93E
10625 8395,12 8305,12 37 0 S 4,50 E 1,64 6003,63S 1215,93E
5589,80
5761,66
5912.84
6030,04
6125.46
10848 8575,39 8485,39 35 5 S 5,90 E ,93 6134,30S 1227.78E
10943 8653,59 8563,59 34 5 S 2,90 E 2,08 6188,06S 1231,94E
11036 8730,60 8640.60 34 5 S 2,90 E ,00 6240,14S 1234,57E
6255,95
6309.50
6361,09
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 6361,09 FEET
AT SOUTH 11 DEG, 11 MIN, EAST AT MD = 11036
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 168,81 DEG,
SP~.ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
WEST EZLEEN/Z-16
500292224500
0,00
11036,00
COMPUTATION DATE:
022692
DATE OF SURVEY' 022592
MWD SURVEY
JOB NUMBER" AK-MW-20009
KELLY BUSHING ELEV, = 90,00
OPERATOR' BP EXPLORATION INC
FT,
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 ,00 -90,00 ,00 N ,00 E
1000 996,48 906,48 50,56 S 19,19 E
2000 190t,80 1811,80 454,74 S 90,70 E
3000 2639,78 2549,78 1113,53 S 233,93 E
4000 3385,98 3295,98 1752.37 S 420,12 E
,00
3,52 3,52
98,20 94.68
360.22 262.02
614,02 253.80
5000 4123,55 4033,55 2408,51 S 579,28 E
6000 4874,94 4784,94 3055,98 S 706,05 E
7000 5623.88 5533,88 3697,45 S 871,93 E
8000 6378,36 6288,36 4340,99 S 995,92 E
9000 7148.08 7058,08 4972,98 S 1083,45 E
876,45 262,43
1125,06 248,62
1376,12 251,06
1621,64 245,52
1851,92 230.27
10000 7901,54 781'1,54 5622,64 S 1177,41 E
11000 8700,79 8610,79 62t9,98 S 123'3,55 E
11036 8730,60 8640,60 6240.14 S 1234,57 E
2098,46 246.54
2299,2! 200.75
2305,40 6.19
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
MINIMUM CURVATURE METHOD.
SPERRY-SUN DRZLLZNG SERVZCES
"~-"" ANCHORAGE ALASKA
PAGE 4
WEST EZLEEN/Z-16
500292224500
0.00
11036.00
COMPUTATZON DATE:
022692
ZNTERPOLATED VALUES FOR
EVEN
DATE OF SURVEY: 022592
MWD SURVEY
JOB NUMBER: AK-MW-20009
KELLY BUSHZNG ELEV. = 90.00
OPERATOR: BP EXPLORATZON ZNC
100 FEET OF SUB-SEA DEPTH
FT.
TRUE
NEASD VERTZCAL
DEPTH DEPTH
SUB-SEA
VERTZCAL
DEPTH
TOTAL
RECTANGULAR COORDZNATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTZCAL
DIFFERENCE CORRECTZON
0 .00 -90
90 90.00
190 190.00 100
290 290.00 200
390 390.00 300
.00
.00
.00
.00
.00
.00 N .00 E
.00 N .00 E
.00 S .01 E
.17 S 1.11 E
.35 S 2.32 E
.00
.00 .00
.00 .00
.01 .01
.01 .01
490 490.00 400
590 590.00 500
690 690.00 600
790 790.00 700
891 890.00 800
.00
.00
.00
.00
.00
.72 S 3.58 E
3.21 S 5.54 E
8.60 S 8.02 E
18.30 S 11.28 E
3t.71 S 14.93 E
.02 .01
.08 .05
.26 . 19
.79 .53
1 .76 .97
993 990.00 900
1096 1090.00 1000
120t 1190.00 1100
1308 1290.00 1200
1417 1390.00 1300
.00
.00
.00
.00
.00
49.23 S 18.91 E
73.71 S 23.36 E
105.47 S 28.92 E
143,63 S 37.46 E
185.57 S 47.71 E
3.37 1.62
6.45 3.07
11.53 5.O9
18.93 7.39
27.85 8.92
1526 1490.00
1635 1590.00
1746 1690.00
1862 1790.00
1984 1890.00
1400
1500
1600
1700
1800
.00
.00
.00
.00
.00
227,39 S 56,41 E
270.95 S 63,83 E
318.06 S 69,85 E
375,27 S 78,06 E
445,54 S 89,22 E
36.59 8.74
45.92 9.33
56.64 10.72
72.19 15.55
94.96 22.77
2116 1990.00
2251 2090.00
2388 2190.00
2525 2290.00
2661 239O.00
1900
2000
2100
2200
2300
.00
.00
.00
.00
.00
530.31 S 102.91 E
619.65 S 117.74 E
711.89 S 135.34 E
803.10 S 154.33 E
892.22 S 176.12 E
126.81 31.85
161.73 34.92
198.91 37.18
235.58 36.68
271.30 35.71
2796 2490.00
2932 2590.00
3068 2690.00
32O3 2790.00
3338 289O.OO
24OO
2500
26OO
2700
2800
.00
.00
.00
.00
.00
979.75 S 200.06 E
1068.98 S 222.74 E
1158.48 S 245.22 E
1246.72 S 268.10 E
t334.22 S 291.41 E
306.33 35.03
342,26 35.93
378,33 36,07
413,.65 35,31
448,55 34.91
3472 2990.00
3604 3090.00
3736 3190,00
3870 3290,00
4005 3390,00
2900.00
3000.00
3100.00
3200.00
3300.00
1419.32 S 316.33 E
1501.98 S 342.89 E
1583.57 S 370.18 E
1669.36 S 396.14 E
1755.88 S 421.07 E
482.21 33.66
514.64 32.43
546.56 31.92
580.85 34.29
615.42 34.57
SPERRY-SUN DRTLLZNG SERV:[CES , ANCHORAGE ALASKA
PAGE
NEST EZLEEN/Z-16
500292224500
0.00
11036.00
COHPUTATZON DATE:
022692
DATE OF SURVEY: 022592
NWD SURVEY
JOB NUNBER: AK-NW-20009
KELLY BUSHZNG ELEV. = 90.00
OPERATOR: BP EXPLORATZON ZNC
FT.
]:NTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE
NEASD VERTZCAL
DEPTH DEPTH
4140 3490.00
4276 3590.00
4412 3690.0O
4549 3790.00
4686 389O.00
SUB-SEA
VERTZCAL
DEPTH
3400.00
3500.00
3600.00
3700.00
3800.00
TOTAL
RECTANGULAR COORDZNATES
NORTH/SOUTH EAST/NEST
1843,87 S 443.66 E
1933,07 S 464.31 E
2023.15 S 485.64 E
2114,31 S 508,20 E
2204,97 S 530.57 E
ND-TVD VERTZCAL
DZFFERENCE CORRECTZON
650.52 35.10
686.11 35.59
722.38 36.28
759.56 37.18
?96.39 36.83
4820 3990.00
4955 4090.00
5088 4190.00
5221 4290.00
5355 4390.00
5488 4490.00
5621 4590.00
5754 4690.00
5887 4790.00
6020 4890,00
3900.00
4000.00
4100.00
4200.00
4300.00
4400.00
4500.00
4600.00
4700.00
4800.00
2292.18 S 551.67 E
2379.39 S 572.77 E
2465.92 S 590.96 E
2552.31 S 608.53 E
2638.80 S 624.77 E
2725.40 S 639,58 E
2811.89 S 654.73 E
2897.67 S 672.19 E
2983.46 S 689.64 E
3068.81 S 709.06 E
830.74 34.35
865.09 34.35
898.59 33.49
931.90 33.31
965.11 33.22
998.22 33.11
1031.31 33.08
1064.21 32.91
1097.12 32.91
1130.02 32.91
6152 4990.00
6286 5090.00
6419 5190.00
6553 5290.00
6686 5390.00
4900.00 3154.05 S 729.05 E
5000.00 3239.50 S 750.18 E
5100,00 3325.15 S 772.33 E
5200,00 3410,84 S 794,72 E
5300,00 3496.60 S 817,70 E
1162.93 32.91
1196.15 33.23
1229.67 33.52
1263.25 33.58
1296.98 33.73
6820 5490.00
6954 5590.00
7O88 5690.00
7223 5790.00
7358 5890.00
5400.00 3582.36 S 840.68 E
5500.00 3668.32 S 864.02 E
5600.00 3754.30 S 887.38 E
5700.00 3842.22 S 908.54 E
5800.00 3931.37 S 928.30 E
1330.71 33.73
1364.63 33.92
1398.56 33.93
1433.40 34.84
1468.82 35.42
7492 5990.00
7625 6090.00
7756 6190.00
7885 6290.00
8015 639O.O0
5900.00
6000.00
6100.00
62OO.O0
6300.00
4018.88 S 946.27 E
4103.98 S 961.62 E
4187.63 S 975.24 E
4269.50 S 986.75 E
4350.40 S 997.13 E
1502.93 34.11
1535.14 32.21
1566.23 31.09
1595.98 29.75
1625.02 29.05
8144 6490.00
8274 6590.00
8403 6690.00
85'31 6790.00
8659 6890.00
6400.00
6500.00
6600.00
6700.00
6800.00
4432.00 S 1010.20 E
4513.63 S 1023.75 E
4594.06 S 1034.81 E
4673.24 S 1043.22 E
4753.59 S 1051.88 E
1654.76 29.74
1684.55 29.79
1713.37 28.82
1741.20 27.83
1769.78 28.58
WEST EILEEN/Z-16
500292224500
0.00
11036.00
COMPUTATZON DATE:
022692
SPERRY-SUN DRZLLZNG SERVZCES
ANCHORAGE ALASKA
PAGE
DATE OF SURVEY: 022592
NWD SURVEY
JOB NUHBER: AK-HW-20009
KELLY BUSHZNG ELEV. = 90.00
OPERATOR: BP EXPLORATZON ZNC
FT.
ZNTERPOLATED VALUES FOR EVEN t00 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTZCAL VERTZCAL RECTANGULAR COORDZNAT
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WE
ES ND-TVD VERTZCAL
ST DIFFERENCE CORRECTION
8790 6990.00 690,3.~0 4836.94 S 1062.96 ~: 1800.4~ 30.66
8922 7090.00 7000.00 4922.69 S 1075.97 E 1832.8(3 32.3'7
9057 7190.00 7100.00 5011.40 S 1087.96 E 1867.04 34.23
9193 7290.00 7200.00 5103.04 S 1L, 9,, 73 E 190~.11 ,.~6.07
9329 7390.00 7300.00 5194.53 S 1'09.45 E 1939.07 35.96
9464 7490.00 7400,00 ~:~"8~,.~* ~ ~ 111q ..... 95 E 197~ 48 ~.;5.:~1
9598 7590.00 7500.00 5373.63 S 1!31.88 E 2008.4.9 2;4.01
9729 7690.00 7600.00 5457.53 S t146.61E 2039.36 31.37
9858 7790.00 7700.00 5537.45 S 1162.30 E 2068.83 28.97
9985 7890.00 7800.00 5614.00 S 1175.96 E 2095.51 26.68
10110 7990.00 7900.00 5688.04 S 1188.04 E 2120.53 25.02
10236 8090 O0 8000.00 5764.47 S
10364 8190.00 8100.00 584-2.64 S 1207.4~, E 2174.08 27.24
10492 8290.00 8'200.00 5922.34 S 12! 1 .39 E 2202.02 27.94
10618 8390.00 8300.00 5999.77 S 12'!5.63 E '2228.58 '26.55
10743 8490.00 8400.00 6074.60 S !221.61 E 2253.63 25..34
10865 85an O0 8500 00 6144 ~I S 1~28 84 ~ ~
....... ~ .... 2075.85 ~2.~':
10986 8690.00 8600.00 6212.68 S t233.18 E ';£296.97 2t. I
11036 8730.60 8640.60 6240.13 S '1234.57 E 2305.40
THE CALCULAT'izON PROCEDURES USE A LIHEAR iH'TEF, POL/~T?OI"i B£T\,,/EEii
THE NEAREST 20 . t.,,,,~T f'.,!D (FROi',4 HINI?',IUM CUR'v"ATURE.~ PC'INTS
AOGCC GEOLOGICAL MATERIALS iNVENTORY LIST
checl~ off ' · ·
~ ,.,.,~.~. ,,,, u, ~,=,L ua~a us ;~ ;s rccc;vee."l;s; rece;veN (late tor 4Ur, if not re~.uircd list as NR
I. 407 ! */o/~/~ j drilli.~ histo~- J ~ su~'ev ~ J well tests j~J core descr~ptio~
_cored inte~als core analysis j~j d~ ditch inte~als digital data
i , ! , ' , ,
i ' '~' -,'~*,,- i RUN
-v~ , , ~ ,,~,~,.~o SCALE
.... , NO. [to thc nearest foot~ [inchll
3~
RI ~ / ' '
-
~o~ ......
1
iii
._
i i ii, . i
13]
i iii1.111 ii i i i
...
~1i i i i
.
,
i i ii ii i.i i i i
-' ' i iiiiii i i i i i ii i iiii iiii ii
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 07/08/92
T# 83687
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed
questions, please contact BP Well Records at
D-17 PROD-F
G-31,~./~-/ GAS ENTRY SURVEY
5 "
M-12 ~[~6~ INJ 06/29/92
M-14~O-~ INJ 06/24/92
M-26A ~$-~ PROD-F 06/28/92
Z-167~~- PRODUCTION LOG ~ 07/02/92
06/26/92 . #1
06/30/92
#1
#1
#1
#1
below. If you have any
(907) 564-4004.
9900.00-10170.00 CAMCO 5 "
#1 8960.00- 9200.00 CAMCO
9750.00-10180.00 CAMCO 5 "
10170.00-10720.00 CAMCO 5 "
10950.00-11754.00 C~CO 5 "
11150.00-11469.00 SCH 5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
JUL ] 1992
Alaska Oil & 6as Cons. 6ommission
Anchomge
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 05/06/92
T# 83486
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
CCL
01 CCL
04/26/92 #1
04/26/92 #1
05/02/92 #1
9900.00-10020.00 ATLAS 5 "
9900.00-10036.00 ATLAS 5 "
11160.00-11498.00 ATLAS 5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
MAY 1 ~ 1992
Alaska Oil & Gas Oons. Gommissior~
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 04/15/92
T# 83409
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
,.,.;
X-16 / PRODUCTION LOG
Z-16 ~'/ CCL
04/09/92 #1
04/05/92 #1
10350.00-10600.00 ATLAS 5 "
11150.00-11539.00 ATLAS 5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
APR 2 4 1992.
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 04/08/92
T# 83381
BP CASED HOLE
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
B-26'~3-?? PFC
A-04'/~'-~ CL
A-01 ?/',27 PRODUCTION LOG
~S-32 ~o-;~ PRODUCTION LOG
W-11~--'.~ COMPLETION
W- 10 ~-~ ~ PERF
H-06 ~-~ PRODUCTION LOG
ccm
D- 07 CCL
04/02/92 #1
04/04/92 #1
03/30/92 #1
04/04/92 #1
04/05/92 #1
04/04/92 #1
04/03/92 #1
04/02/92 #1
03/31/92 #1
03/29/92 #1
10390.00-11306.00 ATLAS
9300.00- 9600.00 ATLAS
8650.00- 9008.00 SCH
10200.00-10565.00 SCH
12470.00-13506.00 SCH
13490.00-14480.00 SCH
9400.00- 9774.00 SCH
8300.00-11573.00 SCH
12200.00-12320.00 ATLAS
12298.00-12303.00 ATLAS
5 "
5 "
5 "
5 "
5 "
5 "
5 "
5 "
5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
APR '1 5 1992
Alaska 011 & Gag Con~. Commission
An(=horage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03/17/92
T# 83333
BP MAGNETIC LIS TAPES
Enclosed is your copy of the materials listed below.
questions, please contact BP Well Records at (907)
Z-16 OH/BHC FIN 03/02/92 #1
8300.00-11700.00 1600BPI
API#500292224500 8535->TP#
Information Control
Well Records
Adrian J. Martin
If you have any
564-4004.
ATLAS REF#102139
RECEIVED
MAR ;5 '1 1992.
Alaska 0it & Gas Cons, Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
HOLE FINALS
Enclosed is your copy of the materials listed below.
questions, please contact BP Well Records at
DATE: 03/10/92
T# 83313
If you have any
(907) 564-4004.
H-08 ~-Z~ PERF
F-40 ~/'/J~ PERF./--//7
N-12 ~/-/F PERF
F-41~/-/~FPRODUCTION LOG
E-10~/-/~ TDT-P
.Z__-,,~6~'q~__CBT
X-17~/~ PRODUCTION LOG
02/27/92 #1
02/28/92 #1
03/02/92 #1
02/26/92 #1
02/29/92 #1
03/04/92 #1
03/04/92 #1
Z-16 92.~*ULTRASONIC IMAGER
5 "
9100.00- 9432.00 SCH 5 "
9675.00-10654.00 SCH 5 "
9600.00- 9854.00 SCH 5 "
0.00-11561.00 SCH 5 "
11050.00-11727.00 SCH 5 "
7700.00-11514.00 SCH 5 "
9390.00- 9812.00 SCH 5 "
7700.00-11542.00 SCH
03/04/92~#1
Information Control
Well Records
Adrian J. Martin
RECEIVED
MAR 2 4 1992
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East B~nson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03/09/92
T# 83307
HOLE FINALS
Enclosed is your copy of the materials listed
questions, please contact BP Well Records at
below. If you have any
(907) 564-4004.
Z-16 DIL 03/02/92 #1
Z-!6 BHC~ 03/02/92 #1
Z-16 CNL 03/02/92 #1
10900.00-11657.00 ATLAS
10900.00-11628.00 ATLAS
10900.00-11604.00 ATLAS
2/5"
2/5"
2/5"
information Control
Well Records
Adrian J. Martin
RECEIVED
MAR 2 ~ 1992
Alaska Oil & Gas Con~. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03/13/92
T# 83317
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
~" D-08~,~Z/Z...,~¢, TUBING CUTTER
'/ Z-16 ~'/'~' PFC
~'/W-40 ~-;~f COMPLETION
~/ W-38 ~-~r COMPLETION
-/ D-24 ~3"~f~ COMPLETION
03/05/92 #1
03/06/92 #1
03/06/92 #1
03/09/92 #1
03/07/92 #1
8650.00- 8885.00 ATLAS 5 "
8300.00- 8650.00 ATLAS 5 "
9660.00-10301.00 SCH 5 "
13696.00-14720.00 SCH 5 "
10740.00-10840.00 SCH 5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
MAR 2 4 1992
Alaska 011 & Gas Cons. Commission
Anchorage
ALASKA OIL AND GAS
CONSERVATION COMMISSION
February 3, 1992
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501.3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
Karen M Thomas
PBU Sr Tech Asst
BP Exploration
P O Box 196612
Anchorage, AK 99519-6612
Re: Well # Prudhoe Bay Unit Z-16
Company BP Exploration
Permit # 92-12
Surf Loc 982'FNL, 1926'FWL, Sec 19, TllN, R12E, UM
Btmhole Loc 2309'SNL, 1712'WEL, Sec 30, TllN, R12E, UM
Dear Ms Thomas:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and
does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance
with 20 AAC 25.035. Sufficient notice (approximately 24 hours)
of the BOPE test performed before drilling below the surface
casing shoe must be given so that a representative of the
Commission may witness, the test. Notice may be given by
contacting the Commission petroleum field inspector on the North
Slope pager at 659-3607.
Sincerely,
Ch airman
Alaska C~iq--~nd Gas Co~servation Commission
BY ORDER OF THE COMMISSION
jo/encl
c: Dept of Fish & Game, Habitat Section, w/o encl
Dept of Environmental Conservation w/o encl
TO:
~ypto, ~tion (Alaska) Inc.
Box
Al,,;horaOe Alaska 995t§-6~12
ARCO Alaska, Inc.
RECEIVED
TELECOPY
Gas Cons. Commission
Anchorage
FROM:
Name & Ext.: .~_.~-~-~ ~ ,-~,~---~
Department:
NOTES:
PAGES TO FOLLOW --- ................. (Do not include cover sheet)
SECURITY CLASSIFICATION
PRIVATE
.... : ::.. i J. l t U_I_L_[. 'J[L ......
SECRET .. CONFIDENTIAL
' .;_...:.:z:._. ;, _:. . ._._ :.., t;..~...: __,,, -w~.._-:.._.::::.~ ;7 ......... .-T~:.--.:- -..-._ :. ..: : ::.;:~..~_ _J_.~_.,,. ,, ..,...
SATELLITE FAX MACHINE
r~^~ .................... CONFIRM#
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrilll-Illb. Type of well.~'X'l~,~.i~'~l-! Stratigraphic Test I'-I Development O,,[]
Re-Entry [] DeepenI-II Service [] Development Gas [] SingleZone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 90'feet Prudhoe Bay Field/Prudhoe
BP Exploration
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 47453
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025)
982'FNL, 1926' FWL, SEC. 19, T11N, R12E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
2127' FNL, 1749' WEL, SEC. 30, T11N, R 12E Z- 16 (32-30-11-12) 2S 100302630-277
At total depth 9. Approximate spud date Amount
2309' SNL, 1712' WEL, SEC. 30, T11N, R12E February 3, 1992 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD)
p rope~L line
28262 @ 2309' f e e t Z- 17 @ 736'/32' f e e t 2560 1162 7'MD/9204'TVD~ e e t
16. To be completed for deviated wells 17. Anticipated pressure (s.e 20 AAC 25.035 (e)(2))
Kickoff depth 5oo~eet Maximum hole angle,~o. 63° Maximum surface 3330psig At total depth (TVD) 8800'/4390psig
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
20" Cond. 80' Surface 110' 110'
13-1/2" 10-3/4" 45.5~ ~a~J-55 Butt 2970' Surface 3000' 2656' 2300 cuft Arcticset 111/460 c f "G'
9-7/8" 7-5/8" 29. 7# j NTgSHS NSCC 10676' Surface 10956' 8694' 1760 cu fl Class "G"
6-3/4" 5-1/2" 17#J '3C'~T8° FL4S 921' 10706' 8505' 11627' 9204' 200 cu fl Class "G"
I
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor RECEIVED
Surface
Intermediate
Production JAN 2 8 $992
Liner
Perforation depth' measured Alaska 0il & Gas Cons. commisfe~
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l'~l
Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-1
21. I hereby certify,.t, hat the foregoing is true and correct to the best of my knowledge
Signed ~c~'~_ .~-~.~~ Title PBU Senior TechnicalAssistant Date
Commission Use Only ~
Permit Number IAPI number IApproval date ISee cover letter
,~. 2_/.% 150- ~,z?_. ~ '2 ~.. ,?_4' I ~ - ~"'¢2~ Ifor other requirements
Conditions of approval Samples required [] Yes .~No Mud Icg required I'-IYes,.:E~l No
Hydrogen sulfide measures [] Yes ~_ No Directional survey required ~ Yes [] No
Required ~M; E]3M; J~5M; []1OM; I-I15M;
Other:~ by order of
Approved b~_.~_~ Commissioner [ne commission Date. .2,~' .~_~.'.z._.
Submit
'iplicate
PRELIMINARY WELL PLAN
Well:
Z-16 [32-30-11-12] PBU
LOCATION:
Surface:
Target:
T.D.:
982' SNL, 3352' WEL, Sec. 19, T11N, R12E
2127' SNL, 1749' WEL, Sec. 30, T11 N, R12E
2309' SNL, 1712' WEL, Sec. 30, T11N, R12E
ESTIMATED START:
Feb. 3, 1992
OPR. DAYS TO COMPLETE: 25 (20 days drilling, 5 days completion)
CONTRACTOR:
Nabors 28E
MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 40.63o/ S 11.5° E /500'/2.5
Item TVDss MD(BKB) Mud Wt.
20" CONDUCTOR
10-3/4" SHOE
BASE WEST SAK FORMATION
7-5/8" SHOE
TOP SAG RIVER SANDSTONE
CURRENT GOC
TOP SADLEROCHIT
TARGET
TOTAL DEPTH
80 8.5
2551 2980 10.2
4875 6O42 9.5
8604 10956 10.5
8612 10966 10.5
8794 11206 9.3
8781 111 89 9.3
8897 11342 9.3
9114 11627 9.3
LOGGING PROGRAM:
Open Hole - Record all logs on magnetic tape where applicable.
9-7/8" Hole: None
6-3/4" Hole: DIL/BHCS/CNL-GR
Cased Hole
CBT/USIT and Gyro survey after rig release.
SS: 1/23//92
RECEIVED
JAN 2 8 1992
Alaska 0ii & Gas Cons. ijummis$ion
Anchorage
PR~'IMINARY WELL PLAi
WELL Z-16 [32-30-11-12] PBU
20" Conductor
PROPOSED
DEPTH MD/BKB
110'
Ball Valve
10-3/4" Casing
13-1/2" hole
2100'
2980'
3000'
4-1/2" 12.6# L-80 TDS tubing with GLM's
7-5/8" Packer
10656'
5-1/2" Tieback Assembly
10706'
7-5/8" Shoe
9-7/8" Open Hole
10956'
10966'
5-1/2" 17# 13 Cr-NT 80 FL4S Liner
6-3/4" PBTD
5-1/2" Liner Shoe
6-3/4" Open Hole
11565'
11625'
11627'
SS 1/23/92
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL Z-16 [32-30-11-12]
Install and cement 80' of 20" conductor to surface.
PBU
I
The Drilling fluid program will consist of an 8.5 - 10.2 ppg spud mud in the 13-
1/2" hole, a 9.5 - 10.5 ppg water base mud in the 9-7/8" hole and a 9.3 ppg
water based mud in the 6-3/4" hole.
Drill 13-1/2" hole to 3000'. Run and cement 10-3/4", 45.5 #,'NT-80LHE Buttress
casing to surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams,
blind rams, and annular preventer. Maximum possible bottomhole pressure is
4390 psi at 8800' TVDss based on original reservoir pressure. Maximum
possible surface pressure is 3330 psi based on a gas column to surface from
8600' TVDss and an oil column to 8800' TVDss.
A formation leak-off test will be performed 10' below the 10-3/4" shoe.
Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag
River Sandstone. Run a 7-5/8" casing string of 29.7# NT-95HS NSCC to within
10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The
annulus will be freeze protected by dry crude.
Directionally drill the 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside
7-5/8" casing shoe and cement using Class G cement.
Clean out to 5-1/2" float equipment. Change over to NaCI completion fluid.
Test casing and lap to 3500 psi.
Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A
subsurface safety valve with dual control lines will be placed 100' below base of
permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test
packer.
The well will be perforated after the rig has been released.
Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10-
3/4" annulus of the well.
Tubing Size:
4-1/2", 12.6# L-80, TDS tubing with 5 GLM's.
SS- 1/23//92
RECEIVED
JAN 8 t99
Alaska 0il & Gas Cons.
Anchorage
MUD WEIGHT
WELL Z-16
CALCULATIONS
(32-30-11-12)
Mud Wt. (6-3/4" Hole): 9.3 ppg.
P Sag River:
P Sadlerochit:
P Top Sadlerochit:
OB Sag River:
OB Top Sadlerochit:
Current GOC:
7-5/8" Casing Pt.
Top Sag River
Top Sadlerochit
3940 psi.
4010 psi
4010 psi.
223 psi.
234 psi.
@ 8884' TVDBKB
8694' TVDBKB
87O2' TVDBKB
8871' TVDBKB
Cement Calculations
10-3/4" CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
7-5/8"CASING
Measured Depth:
Basis:
Total Cement Vol:
Lead Slurry Vol:
Tail Slurry Vol:
5-1/2"
LINER
Measured Depth:
Basis:
Total Cement Vol:
2980'
2.5 X Annular volume
2760 (cuft)
2300 (cuft) 1185 Sx Arcticset III @ 1.94 Cu ft/Sk
460 (cu ft) 400 Sx class G + 2% CaCI2 cement @
1.16 Cu ft/Sk
10956'
90% Annular Volume of 9-7/8" hole + 50 cuft
1760 (cuft)
1610 (cuft) 590 Sx G+2% D79 @ 2.75 Cu ft/Sk
150 (cuft) 130 Sx Neat G @ 1.15 Cu ft/Sk
10706' (Hanger)- 11627' (Shoe)
1.5 X Annular volume to 7-5/8" shoe + 100 cu ft
200 (cu ft) 172 Sx Neat G @ 1.16 Cu ft/Sk
SS: 1/23/92
RECEIVED
JAN 2 8 3992
Alaska 0il & Gas Cons. uommissio~
Anchorage
$45DUA247:[DRAN033]Z16 CLOSAP SHORT.LIS;3
Search Radius= 200 COURSE LINE
For proposed well: Z-16 [32-30-11-12]
Location = W-E S-N TVD(SBS)
Top 599649.00 5959099.00 -90.00
Bottom 601057.74 5952607.63 9000.00
Note: Ail depths in feet Below Kelly Bushing
23-JAN-1992 15:54
Closest Approach Analysis
Date: 23-JAN-92 Time: 15:54:23
Page 1
Closest Approach
WELL IDENT /PROPOSED~ /NEARBY~
TVD DEPART TVD DEPAR?
A029-2184400
Z-14
A029-2184900
Z-15
A029-2185900
Z-20
A029-2197100
Z-iS
A029-2!97700
5-12
A029-2200100
5-17
k029--2205300
R029-2206900
0 0
0 0
874 6
98 5
500 0
500 0
0 0
0 0
31 2
0 0
0 0
0 0
2.0
1 8
876 3
i00 0
502 3
738 7
5 O0
0 0
0 0
2 t~
)
CLOSEST
DISTANCE
69 0
34 0
135 9
13 } 5
i~ 2 l!
Vertical Intersection
/PROPOSEDN, /NEARBY~
TVD DEPART TVD DEPART
VERTICAL
DISTANCE
S U 2!M A R Y
-./ell which scme:z closes;:, be> ~he pi:0p:a~;ed :,.:eli. is:
A029-2200!00 Z-i7 (
ClosesL approach distance =
KICK OFF for this run =
32.2 feet
500.0 feet
$45DUA247:[DRAN033]Z16 CLOSAP SHORT7.LIS;3
Search Radius= 200 7 DEGREE LEAD LINE
For proposed well: Z-16 [32-30-11-12]
Location = W-E $-N TVD(SBS)
Top 599649.00 5959099.00 -90.00
Bottom 601838.34 5952827.70 9000.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
23-JAN-1992 15:59
Closest Approach Analysis
Date: 23-JAN-92 Time: 15:59:07
Page 1
Closest Approach
WELL IDENT /PROPOSED~ /NEARBY~
TVD DEPART TVD DEPART
A029-2184400
Z-14 0 .0
A029-2184900
Z-15 0.0
A029-2!85900
Z-20 964 .~7
A029-2197!00
Z-t8 98.5
A029-2!97700
%-i 2 500 ~ O
A629-- 2200 i 00
%-17 ~ '7'!.,j.
A029. 2205 ;00
z--il ~ i98 ~<
AO 2 {~--- 220690 O
Z----I. 3 { 560 .0
0 0
0 0
~8 !
0 0
16 9
2.0
1 8
966 6
100 0
502 3
500 0
501. $
0 0
0 0
2 5
0
2 4
CLOSEST
DISTANCE
69 0
34 0
131 0
13 7 5
[03 9
Vertical Intersection
/PROPOSEDN /NEARBY~
TVD DEPART TVD DEPART
VERTICAL
DISTANCE
' i:'.e :/eli ';b.z 21k ,s:,:?mes s!oses t kc, the p~_-oposed well .i. s:
A02g--2200iOO Z-!7 ',
,2!csest approach distance =
KiCK CFF for- this run =
30.q fee~t
500.0 feet
J HI~
NABOR$ '""'-
z~c D:V~RTER SYSTEM
ARCO ALASKA, INC.
~RECEI,VED
JAN ~ 0 ]992
Alask~ 0il & Gas Cons. Commission
Anchorage
10" ~ VALVE 10" BALL VALVE
THE ~ VALVE WILL REMAIN CL~ U NI.E.~ CONI:XTtOHIB REQUIRE
THE ~ OF THE SECOND VENT LINE. THE SECOND VENT UNE VALVE CAN
lie ~ LIEING C:QN11:IOL~ LOCATED ATTHE ACCU~~T~ THIS IS
11419 15 A VAFIAN~E FROM
f.,:.--:::.- ................ ,::,:..- ................
1 .....
ALL TURI~ ARE TARG~
BOP STACK CONFIGURATION
1 ] 5/~"~ 5000 PSi WP
TRIPLE RAM STACK
DRILLING
RISER
ANNULAR
PREVENTER
... BLI ND RAMS )
~ ' ,
2" KILL LINE
MANUAL HYDRAULIC
6ATE GATE
(, ·
· ,
DRILLING
SPOOL
I I
P! PE RAMS
I,
4" CHOKE LINE
HYDRAULIC MANUAL
GATE GATE
t
NORTH
T. i~) N.
T. II N.
WELL Ne Z- 16
ii i
SURFACE LOCATION
LAT. · 70° 17' 51.657"
LONG. · 149° I1' 34.875"
A.S.P.
Y · 5, 959 , 099.90
X = 599 , 649.82 ZONE 4
98:>, FROM N, LINE SECT. 19
19:~6' FROM W. LINE SECT. 19
23
T. II N.
T. ION.
RECEIVED
JAN 2 8 992
Alaska Oil & Gas Cons. Commission
Anchoraqe
(~12 Z$-I
24
7
Ii - 12
SPINE ROA]
SCALE
PAD
27
32
II- 33 - II ~12
33
[
W. E.N.W.
I
( MILES )
=fTW. 'C'
CERTIFIC&TE OF SURVEYOR:
I HEREBY CERTIFY THAT i AM PROPERLY
REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA
AND THAT THiS PLAT REPRESENTS A
LOCATION SURVE~r' MADE BY ME OR UNDER
lay ILmERYISION, MD ~AT &LL ~ENStONS
AND OTHER D~ &R~ CORRECT.
~~~/ NOV. 2o,8~
SURVEYOR DATE ~
~ Bemo~d Tomulich,:,~
'~ $. ~3798 $.
SHEET I*OF 2
WELL PAD 'Z'
WELL N° Z-16 AS-BUILT
ii
LOCATED IN
PROTRACTED SECT. 19, T. II N.,, R. 12E., U.M.
SURVEYED FOR :
· TAkIIII~D ALASKA PRODUCTtO~',~ CO.
PREPARED BY : ! DATE :NOV. 20,86
KUUKPIK -
TECHNICAL SERV. INC. DRAWN eY= ~T.
PRUDHOE BAY OFFICE CHKD. BY: R.H.
CORN. OF SECT. 19
NORTH LINE OF SECTION 19
SUMP
· · · · · ·
JL
· · · · · ·
· · · · · · · · · ·
1926'
SUMP
RECEIVED
t
NORTH
Alaska Oil ~ b~ ~o~.
Anchorage
SHEET 2 OF 2
WELL. PAD 'Z'
i
_
WELL Ne Z-16 AS *JUILT
LOCATED IN S~CT Il, T. I st., I. lEE., I,I,M.
9U R¥IryED POR :
ST2U4~D ALASr~ PS~:~X.~TK~'~ CO.
PRF. PARE~ BY , BATE
KUUKPIK -
TECHNICAL SERV. INC. ~AWN
PR~D~[ ~Y OFfiCE CHKD. ~: R.H.
ITO DISTRIBUTION
TO.P__
TO FLARE
CAVIEM
UNIT 1
SHAKER
SCREEN
CAVlEM
UNIT 2
TRIP TANK
170 BBL
FILL LINE
.SANO ......
TRAP
4 BBL
CHOKE
MANIFOLD
CENTRIFUQi~
PIONEER MI< I
TO PIT
131BBL
VOLUME TANK
137 BBL
EQ.
DITCH
81BBL
DEGASSING
TANK
DESILTER
NABORS
DEGA88ER
DRILCO
8EEFLOW
TO STAND PIPE
& KILL LINE
VOLUME TANK
180 BBL
SUCTION
117 BBL
MUD PUMPS
WATER
87 BBL
MUD
HOPPERS
& MIXING
PUMPS
SUCTK)N
134 BBL
NABOR$ DRILLING LTD
RIG NO. 28E
MUD SYSTEM
SURFACE FAClLITES
TOTAL ACTIVE SYSTEM: 800 BBL
TOTAL SURFACE CAPACITY : 970 BBL
ITEM
(1) Fee
(2) Loc
** CHECK LIST FOR NEW WELL PERMITS **
APPROVE qAT~
~ ~Bru 8~ '
.
3.
4.
5
6
7
(3) Admin [8] 9.
[9 thru 13] 10.
~/-¥.~~/-.~,-.? ~ 11.
[10 & 13] 12.
13.
(4) Casg ~/.~.~-~'. /-~-~- 14.
[14 thru 22] 15.
(5) BOPE '~,~ ?- ~-.~ ~'
[23 thru 28]
(6) Other .~/C_ A//~'//~ ~_.
[29 thru 3'1]
Add]
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
Lease & Well
NO REMARKS
Company
Is permit fee attached ...............................................
Is well to be located in a defined ~x)ol ..............................
Is well located proper distance from property line ...................
Is well located proper distance from other wells .....................
Is sufficient undedicated acrea§e aYa[-l'able in this I~ol .............
Is w~ll to be deviated & is wellbore plat included ...................
Is operator the only affected party ..................................
Can permit be approved before 15-day wait ............................
Does operator have a bond in force ...................................
Is a conservation order needed .......................................
Is aOministrative approval needed ....................................
Is lease nunber appropriate ...........................................
Does well have a unique name & nunber ................................
Is conductor string provided .........................................
Will surface casing protect all zones reasonably expected
to serve as an underground source of drinking water ..................
Is enough cement used to circulate on conductor & surface ............
Will cement tie in surface & intermediate or production strings ......
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wellbore separation proposed .............................
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to ~¢~-~psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Additional requirements .............................................
geol ogy: eng i nee r i rig'
DWJ~ MTM ~ ZCS ~
R PC/~v~C~ BEW-7 RAD'~
JH I-~ ~
rev 03/29/91
jo/6.011
INITIAL GEOi UNIT ON/OFF
POOL CLASS STATUS AREA ~ SHORE
Additional remarks: ~-//~ ~ ~- ~/~'~,
/,
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIx,
No special 'effort has been made to chronologically
organize this category of information.
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN1
102139
CAIN
TRACY LOVE
OPEN HOLE
Z - 16
500292224500
BP EXPLORATION (ALASKA)
ATLAS WIRELINE SERVICES
11-MAR-92
RUN2
C. ZARNDT
RUN3
19
liN
12E
982
~-~ RECEIVED
86.84
85.84 MAR ;3 1 1992
54.09
Alaska Oil & Gas Cons. Commission
Anchorage
CASING DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
CIRCULATION STOPPED AT 1930 HRS. 01-MAR-92
CN WAS DECENTRALIZED WITH BOWSPRING.
BHC-AL USED 6.25" CENTRALIZERS.
DIFL HAD 1.5" STANDOFFS.
CHLORIDES WERE 7200 PPM.
?o.oooS,Z . o°' ---- FI tN E [
6.750
NO UP-LOG REPEAT PASS LOGGED DUE TO TOOL STICKING.
DOWN LOG WAS DEPTH SHIFTED TO MATCH UP LOG.
UP LOG IS VALID DEPTH LOG.
$
**** FILE HEADER ****
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves; all runs merged; no case
hole data.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 11000.0
2435 11000.0
STOP DEPTH
11670.5
11677.0
BCS 11000.0
DIL 11000.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH LL8
10999.0 10999.0
11017.5
11026.0
11027.0
11047.5
11048.5
11051.0
11052.0 11053.0
11056.0
11071.0
11074.5
11077.5
11078.5
11079.0 11079.0
11084.0 11084.5
11084.5
11099.0
11101.0
11134.0 11133.5
11136.0
11137.0
11137.5 11137.5
11138.0
11140.5
11146.0
11146.5
11152.0
11155.0
11159.5
11160.0
11160.5 11159.5
11166.0
11170.0
11173.0
11180.5
11185.0
11189.5
11190.0
11191.0
11196.0
11196.5
11197.0
11200.0
11204.0
11207.0
11210.0
11220.0
11223.5
11224.0
11224.5
11225.0
11233.0
11196.5
11629.0
11657.0
EQUIVALENT UNSHIFTED DEPTH
ILM ILD NPHI
10999.0 10999.0 10999.0
11026.5
11050.0
11027.0
11050.0
11050.0
11053.5
11071.5
11075.0
11079.0
11079.0
11083.0
11101.0
11102.0
11136.5
11136.5
11138.0
11141.0
11146.5
11147.0
11152.0
11155.0
11160.0 11159.5
11165.5
11169.5
11180.5
11191.0
11196.0
11200.0
11207.0
11224.5
11160.0
11173.0
11184.5
11189.0
11196.5 11196.5
11203.5
11206.0
11208.5
11224.5
11220.5
11225.0
11234.0
DT
10999.0
11017.5
11079.0
11138.0
11189.0
11225.0
11234.0
11237.0
11237.5
11241.5
11246.0
11251.5
11274.5
11278.0
11298.5
11299.0
11300.0
11300.5
11304.0
11311.0
11312.0
11318.0
11318.5
11335.0
11344.5
11351.5
11354.0
11375.5
11417.5
11427.5
11436.5
11438.5
11448.0
11463.5
11465.0
11473.0
11476.0
11476.5
11483.0
11483.5
11490.0
11494.5
11497.5
11498.0
11520.5
11522.0
11528.0
11536.5
11543.5
11544.0
11547.0
11560.0
11562.5
11574.5
11617.5
11619.5
11622.0
11640.0
11641.5
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
2435
BCS
11234.0
11237.5
11241.0
11300.5
11312.0
11318.5
11492.0
11545.0
RUN NO.
1
1
1
11246.0
11278.0
11300.0
11312.0
11318.5
11336.0
11352.5
11438.5
11451.0
11466.5
11477.5
11499.0
11522.0
11530.5
11546.0
11562.0
11619.5
11623.5
11641.5
PASS NO.
2
2
2
11234.0
11237.0
11251.0
11278.0
11300.0
11353.5
11439.0
11477.5
11484.5
11498.0
11300.0
11304.5
11318.5
11462.0
11472.0
11482.0
11522.0
11528.0
11535.0
11547.0
11562.0
11574.5
11619.0
11641.5
MERGE TOP
11000.0
11000.0
11000.0
11237.0
11275.0
11346.5
11377.0
11417.5
11428.0
11496.5
MERGE BASE
11670.5
11677.0
11629.0
DIL
$
REMARKS:
CN
WN
FN
COUN
STAT
1 2
11000.0
TENS AND TEND SHIFTED WITH LL8.
SP SHIFTED WITH ILD.
FUCT AND NUCT SHIFTED WITH NPHI.
DATA BEGINS AT LOGGERS CASING DEPTH.
$
: BP EXPLORATION (ALASKA)
: Z - 16
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
11657.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 DT BCS 68 1
2 GR BCS 68 1
3 ILD DIL 68 1
4 ILM DIL 68 1
5 LL8 DIL 68 1
6 SP DIL 68 1
7 MTEM 2435 68 1
8 NPHI 2435 68 1
9 NUCT 2435 68 1
10 FUCT 2435 68 1
11 TEND 2435 68 1
12 TENS 2435 68 1
US/F 4
GAPI 4
OHMM 4
OHMM 4
OHMM 4
MV 4
DEGF 4
PU-S 4
CPS 4
CPS 4
LB 4
LB 4
4 85 618 83 5
4 67 465 06 6
4 93 412 48 5
4 94 723 20 5
4 39 005 82 1
4 58 070 90 6
4 18 487 70 6
4 52 326 75 5
4 83 368 34 1
4 84 023 70 1
4 19 912 29 5
4 19 912 29 5
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 79
Tape File Start Depth = 11743.000000
Tape File End Depth = 10999.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
48
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 19358 datums
Tape Subfile: 2 269 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 3 is type: LIS
**** FILE HEADER ****
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 8315.0 11000.0
2435 8315.0 11000.0
BCS 8315.0 11000.0
$
BASELINE CURVE FOR SHIFTS: GRCH
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH NPHI
8092.0 8092.0
8317.0 8316.5
8570.5 8572.5
9219.5 9220.0
9433.5 9433.5
9699.0 9700.0
9737.0 9736.5
9921.0 9922.0
10153.0 10152.5
10173.5 10172.0
10197.0 10197.5
10588.0 10587.5
10591.0 10591.0
10615.0 10614.0
10760.5 10760.5
10876.5 10876.0
10887.0 10887.0
11001.0 11001.0
$
REMARKS:
CN
WN
FN
COUN
STAT
EQUIVALENT UNSHIFTED DEPTH
ALL CURVES SHIFTED WITH NPHI.
CN-CASING PASS SPLICED TO TOP OF MAIN
PASS RUN UP INTO CASING.
SPLICE DEPTHS: GR ..... 10906.5
NPHI (FUCT, NUCT) ..... 10912.5
TENS-TEND ..... 10966.0
DT ..... 10939.0
MTEM ..... 10897.0
DATA STOPS AT LOGGERS CASING DEPTH.
$
: BP EXPLORATION (ALASKA)
: Z - 16
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 DT BCS 68 1
2 GRCH BCS 68 1
3 MTEM 2435 68 1
4 NPHI 2435 68 1
5 FUCT 2435 68 1
6 NUCT 2435 68 1
7 TEND 2435 68 1
8 TENS 2435 68 1
US/F
GAPI
DEGF
PU-S
CPS
CPS
LB
LB
4 4 85 618 83 5
4 4 67 465 06 6
4 4 18 487 70 6
4 4 52 326 75 5
4 4 84 023 70 1
4 4 83 368 34 1
4 4 19 912 29 5
4 4 19 912 29 5
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 208
Tape File Start Depth = 11001.000000
Tape File End Depth = 8092.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
32
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 52372 datums
Tape Subfile: 3 261 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
**** FILE HEADER ****
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
2
0.2500
VENDOR TOOL CODE START DEPTH
GR 10900.0
2435 10900.0
AC 10935.0
DIFL 10955.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
11675.0
11680.0
11630.0
11680.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
BHC/ACOUSTILOG
DUAL INDUCTION
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
02-MAR-92
FSYS 256 REV G002 VER2.0
1930 01-MAR-92
225 02-MAR-92
11669.0
11662.0
10900.0
11657.0
1800.0
TOOL NUMBER
3974
3967
2806
1309
2435
3506
1603
1503
6.750
11012.0
11000.0
XCD POLYMER
9.60
51.0
9.0
6.0
205.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
MAIN (LOG UP) PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 16
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.508 73.0
0.188 205.0
0.451 73.0
0.000 0.0
0.474 73.0
0.000 0.0
THERMAL
0.00
7.875
1.5
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
1 AC AC 68 1
2 ACQ AC 68 1
3 GR AC 68 1
4 CN 2435 68 1
5 CNC 2435 68 1
6 CSSN 2435 68 1
7 CLSN 2435 68 1
8 CHT 2435 68 1
9 SPD 2435 68 1
10 TEMP 2435 68 1
11 TTEN 2435 68 1
12 RFOC DIFL 68 1
13 RILD DIFL 68 1
14 RILM DIFL 68 1
15 SP DIFL 68 1
16 CILD DIFL 68 1
17 VILD DIFL 68 1
18 VILM DIFL 68 1
US/F
GAPI
PU-L
PU-S
CPS
CPS
LB
F/MN
DEGF
LB
OHMM
OHMM
OHMM
MMHO
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 48 852 89 1
4 4 81 285 47 0
4 4 95 473 00 0
4 4 52 326 75 5
4 4 98 211 23 1
4 4 83 368 34 1
4 4 08 501 10 0
4 4 19 912 29 5
4 4 54 376 29 5
4 4 18 487 70 6
4 4 19 912 29 5
4 4 27 515 24 6
4 4 04 903 06 0
4 4 06 213 78 0
4 4 53 419 67 0
4 4 34 704 23 6
4 4 04 522 10 6
4 4 04 522 10 6
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 261
Tape File Start Depth = 11743.000000
Tape File End Depth = 10895.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
72
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 83826 datums
Tape Subfile: 4 339 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 5 is type: LIS
**** FILE HEADER ****
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
1
0.2500
VENDOR TOOL CODE START DEPTH
GR 11030.0
2435 11030.0
AC 11060.0
DIFL 11090.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
11680.0
11685.0
11650.0
11670.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
BHC/ACOUSTILOG
DUAL INDUCTION
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
02-MAR-92
FSYS 256 REV G002 VER 2.0
1930 01-MAR-92
302 02-MAR-92
11669.0
11662.0
10900.0
11604.0
1800.0
TOOL NUMBER
3974
3967
2806
1309
2435
3506
1603
1503
6.750
11012.0
11000.0
XCD POLYMER
9.60
51.0
9.0
6.0
205.0
0.508
0. 188
73.0
205.0
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
REPEAT (LOG DOWN) PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 16
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.451 73.0
0.000 0.0
0.474 73.0
0.000 0.0
THERMAL
0.00
7.875
1.5
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 AC AC 68 1
2 ACQ AC 68 1
3 GR AC 68 1
4 CN 2435 68 1
5 CNC 2435 68 1
6 CSSN 2435 68 1
7 CLSN 2435 68 1
8 CHT 2435 68 1
9 SPD 2435 68 1
10 TEMP 2435 68 1
11 TTEN 2435 68 1
12 RFOC DIFL 68 1
13 RILD DIFL 68 1
14 RILM DIFL 68 1
15 SP DIFL 68 1
16 CILD DIFL 68 1
17 VILD DIFL 68 1
18 VILM DIFL 68 1
US/F
GAPI
PU-L
PU-S
CPS
CPS
LB
F/MN
DEGF
LB
OHMM
OHMM
OHMM
MMHO
4 4 48 852 89 1
4 4 81 285 47 0
4 4 95 473 00 0
4 4 52 326 75 5
4 4 98 211 23 1
4 4 83 368 34 1
4 4 08 501 10 0
4 4 19 912 29 5
4 4 54 376 29 5
4 4 18 487 70 6
4 4 19 912 29 5
4 4 27 515 24 6
4 4 04 903 06 0
4 4 06 213 78 0
4 4 53 419 67 0
4 4 34 704 23 6
4 4 04 522 10 6
4 4 04 522 10 6
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 215
Tape File Start Depth = 11711.000000
Tape File End Depth = 11015.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
72
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 105288 datums
Tape Subfile: 5
Minimum record length:
Maximum record length:
291 records...
62 bytes
994 bytes
Tape Subfile 6 is type: LIS
**** FILE HEADER ****
FILE HEADER
FILE NUMBER: 5
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8298.0
2435 8298.0
AC 8300.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10980.0
10980.0
10980.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
MIS
TEMP
GR
CN
PCM
AC
DIFL
$
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
GAMMARAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
BHC/ACOUSTILOG
DUAL INDUCTION
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
02-MAR-92
FSYS 256 REV G002 VER 2.0
1930 01-MAR-92
302 02-MAR-92
11669.0
11662.0
10900.0
11604.0
1800.0
TOOL NUMBER
3974
3967
2806
1309
2435
3506
1603
1503
6.750
11012.0
11000.0
XCD POLYMER
9.60
51.0
9.0
6.0
205.0
0.508
0.188
0.451
0.000
0.474
0.000
73.0
205.0
73.0
0.0
73.0
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: CN-CASING PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 16
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
THERMAL
0.00
7.875
1.5
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
1 AC AC 68 1
2 ACQ AC 68 1
3 GR AC 68 1
4 CN 2435 68 1
5 CNC 2435 68 1
6 SSN 2435 68 1
7 LSN 2435 68 1
8 CHT 2435 68 1
9 SPD 2435 68 1
10 TEMP 2435 68 1
11 TTEN 2435 68 1
12 RFOC DIFL 68 1
13 RILD DIFL 68 1
14 RILM DIFL 68 1
15 SP DIFL 68 1
16 CILD DIFL 68 1
17 VILD DIFL 68 1
18 VILM DIFL 68 1
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
US/F 4
4
GAPI 4
PU-L 4
PU-S 4
CPS 4
CPS 4
LB 4
F/MN 4
DEGF 4
LB 4
OHMM 4
OHMM 4
OHMM 4
MV 4
MMHO 4
MV 4
MV 4
4 48 852 89 1
4 81 285 47 0
4 95 473 00 0
4 52 326 75 5
4 98 211 23 1
4 83 368 34 1
4 08 501 10 0
4 19 912 29 5
4 54 376 29 5
4 18 487 70 6
4 19 912 29 5
4 27 515 24 6
4 04 903 06 0
4 06 213 78 0
4 53 419 67 0
4 34 704 23 6
4 04 522 10 6
4 04 522 10 6
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 889
Tape File Start Depth = 10980.000000
Tape File End Depth = 8092.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
72
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 303334 datums
Tape Subfile: 6 961 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 7 is type: LIS
**** TAPE TRAILER ****
92/ 3/12
01
**** REEL TRAILER ****
92/ 3/13
01
Tape Subfile: 7 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 13 MAR 92 4:06p
Elapsed execution time = 1 minute , 41.2 seconds.
SYSTEM RETURN CODE = 0