Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
192-026
ON OR BEFORE C:LO~LM.I:)°c P L UGG i_~ = & LOCATION _=EA~_NCE REPORT Abnd DaZe Comp!cUed Liner: Rev-'aw ~--e we~__ ~ f~__ ~ _~, ~d' cerumen= cn pluqging, well head snau',,s, ~d !oca~imn c!ear~ca - provide loc. clear, code. . PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA_PLUS Page- i Date' 02/08/94 RUN DATE_RECVD 92-026 BHCS/GR/CAL 92-026 CDN 92-026 92-026 407 DAILY WELL OP L !21-4804 1 L 4794-10600, LWD 92-026 CDR L 4794-10600, LWD COMP R COMP DATE: 03/22/92 R 03/13/92-03/23/92 R 120-10601 T 98-4521, OH-BHC/GR/CAL 1 92-026 5223 T 4794-10600~ OH-CDN/CDR COMP 92-026 SURVEY 92-026 5212 COMP Are dry ditch samples required? yes no~_~~nd received? Was the well cored? ye~//~~~alysis & description received? Are well tests requir~d~es ceived? ye Well is in compliance In% ti-~i Comments __~ ./k~i _~- ?~ , ~,_ 7~'f O~ ~ 03/31/92 04/06/92 04/06/92 03/23/92 03/23/92 03/23/92 03/24/92 04/06/92 ye~ ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 March 23, 1992 Mr. David W. Johnston, Commissioner State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re~) Kuparuk River Unit Well 3R-13 API 50-029-22240 Permit Number 92-03 (Kuparuk River U/nit Well 3R-10 ~ API 50-029-22253 Permit Number 92-26 Dear Mr. Johnston: ARCO requests cancellation of approved permit to drill for Kuparuk River Unit 3R-13, and requests approval of application for permit to redrill well 3R-10A. 3R10A will be drilled to the same bottom hole target as was permitted for 3R-13. Plug and abandon operations on 3R-10 were verbally approved by Mike Minder on March 20, 1992, and were completed March 22. Sidetrack operations to drill 3R-10A are beginning March 23. We appreciate your patience in this matter. If you have any questions, please contact Ellen Fitzpatrick at 263-4638. Sincerely yours, A. Wayne McBride Area Drilling Engineer ARCO Alaska, Inc. Date: April 3, 1992 Transmittal #: 8399 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. Please acknowledge receipt and return one signed copy of this transmittal. 3RR,10 I~ 3RR-10A o/ '~.~"~ 3, -10A CDN 3-1 6-21 -92 4794-1 0600 CDR 3-16-21-92 4794-10600 CDN 3-23-25-92 4794-8065 CDR 3-23-25-92 4794-8065 Receipt Acknowledged: DISTRIBUTION: D&M Drilling Date: R-E-¢-EIV E D APR 0 6 1992_ Alaska 0il & Gas Cons. Commission Anchorage Vendor Package(Johnston) NSK State of Alaska(+Sepia) ARCO Alaska, Inc. Date: April 3, 1992 Transmittal #: 8398 RETURNTO: Transmitted here with are the following items. one signed copy of this transmittal. ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 please acknowledge receipt and return 3R-10 3R-10A LIS Tape and Listing LIS Tape and Listing Receipt Acknowledged' , , 3-21 -92 92223 3-25-92 92225 DISTRIBUTION: RECEIVED Date: ~'~ ~--~' ~' 1992 Alaska 0il & Gas Cons. Commission Anchorage Lynn Goettinger State of Alaska ARCO Alaska, Inc. Date: March 27, 1992 Transmittal #: 8390 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. Please acknowledge receipt and return one signed copy of this transmittal. I3R-20 ~ 2""~' 3R 20 ~,~ ,,~ 3R-10 Receipt "//' CDN v," ,.~ CDR ,//" BHC Sonic-GR-Caliper 3- 1 4- 92 5" & 2" MD Acknowledged: ---~ ..... 3-5-!0-92 3-5-10-92 Date: 5943-10775 5943-10775 121-4804 RECEI.¥ED MAR ;3 1 1992 DISTRIBUTION: D&M Drilling Alaska Oil & Gas Cons.' Commission Anchorage Vendor Package(Johnston) NSK State of Alaska(+Sepia) ARCO Alaska, Inc. Date: March 20, 1992 RETURN TO: Transmittal #: 8383 ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. one signed copy of this transmittal. z --~- 3Q-04 3 R- 12,,~,/ ~Z-'z'z. 3 R-20 / ?~....-/? 3R-18 9 ~.).,,.,~- 3R-10 LIS Tape and Listing LIS Tape and Listing LIS Tape and Listing LIS Tape and Listing LIS Tape and Listing Receipt Acknowledged: DISTRIBUTION: Please acknowledge receipt and return 1 -1 6-92 92078 2-9-92 92141 3- 1 0-92 921 83 2-27-92 92161 3- 1 4-92 921 84 ......... Date: .......... Alaska Oil & Gas Cons. Commission Anchorage State of Alaska Lynn Goettinger STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~ GAS r-~ SUSPENDED r~ ABANDONED [] SERVICE [---] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc 92-26 3. Address 8. APl Number P.O. Box 100360, Anchora~le, AK 99510-0360 50-029-22253 4. Location of well at surface 9. Unit or Lease Name 1716' FNL, 2350' FWL, Sec. 9, T13N, R9E, UM ~ i Kuparuk River Unit '~ "~ · :~ : 10. Well Number At Top Producing Interval 2200' FSL, 2440' FWL, Sec. 3, T13N, R9E, UM '~: : '~..~ : 3R-10 At Total Depth i ~:::~ ~: ~- '~"~i 11. Field and Pool 2388' FSL, 2762' FWL, Sec. 3, T13N, R9E, UM Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River Oil Pool RKB 52', Pad 11' GLI ADL 355023, ALK 3573 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions I 'March 12, 1992 'March 20, 1992 'March 22, 1992 NA feet MSLI none 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Diractional Survey 120. Depth where SSSV set I 21. Thickness of Permafrost 10,600'MD / 7,065' TVD 4,795' MD / 4,115' TVD YES [] NO [] none feet MD appx 1800' MD 22. Type Electric or Other Logs Run E-line GR/BHC Sonic in 12.25" hole, LWD GR/CDR/CDN in 8.5" hole 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOI-I'CNI HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5 H-40 41' 121' 24" 250 sx Arctic Set none pulled 9.625" 47 _-80 41' 4,795' 12.25" 1655 sx Permafrost E & 405 sx Class G none pulled 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET fMD) 'ACKER SET (MDI no perforations none 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10,141'-10,600' 225 sx Class G open hole tagged plug 4,795'-5,100' 250 sx Class G open hole sidetrack kickoff 131u~ 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) I no production Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD FIowTubing Casing Pressure CALCULATED OIL-BBL iGAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE !28. CORE DATA ,,_ no core MAR 3992 Alaska 0/1 & Gas Cons. Commission Anchorage Form 10-407 Submit in duplicate~, I~ Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC IVlARKERS FORMATION TESTS N,NVlE Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Kuparuk C sand 10,294' 6,833' no tests Kuparuk A sand 10,314' 6,848' 31. LIST OF ATTACHMENTS Well history, MWD surveys, P&A schematic 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1- Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersibl~,.W,~e~,n- jection, Gas Injection, Shut-in, Other-explain. E REC /V U Item 28: If no oores taken, indicate "none". 1992. Form 10-407 Alaska 0il & Gas Cons. Corn~ssi°r~ Anchorage PROCEDURE ~'0~SARUK'~iVER FIELD 3R-10 10. 11. 12. 1, RIH w/open-ended drill pipe in 3R-10 Io TD, Circulale and condilion drilling mud. 2, Mix and pump lhe following slurry after circulaling: 160 sx Class 'G' + 0.2% CFR3 + 0.2% HR5. Adjusl addilives as necessary for 3.5-4 hr lhickening lime. Adlusl volume Io Insure lop of cemenl al leasl 100' above lop of C sand, 3. Spol a cmt plug from TD Io +/-10150', Nolify Ihe AOGCC in lime Io wllness P&A work. 4. POH 5 slands (Io lop of plug) and reverse oul 1-1/2 dp volumes. POH !o 9-5/8" shoe. WOC approximalely 12 hrs. 5, RIH w/open-ended drill pipe and lag top of cemenl plug. Record aclual deplh of plug. 6. POH and PU Ibg slinger. RIH open-ended !o +/-5700'. Spo! 50 bbl viscous gelled mud pill from 5700' Io 5100'. 7, POH Io lop of pill and reverse out 1-1/2 dp volumes. 8. Balch mix and pump lhe following slurry after circulaling: 200 sx Class 'G' + 0.2% CFR3 + 1% CaCI. Adjusl addilives as necessary for 3.5-4 hr Ihickening lime. 9, POH Io lop of plug and reverse oul 1-1/2 dp volumes. POH. WOC approximalely 12 hrs. PU 8-1/2" bil and motor or lurbine and RIH lo top of plug at +/-4750'. Drill oul plug lo just below casing shoe al 4795'. Kick off new direclion and drill 3R-10A. RECEIVED MAR 199'Z Alaska Oil & Gas Cons. comrnissk~' Anchorage Abandon & Sidetrack Schematic KRU 3R-10 16" @ 121' md 25' of 12-1/4" rathole .8185 cuft/ft . cmt plug from 5100' to 4795' md 40 bbl viscous gelled mud pill, top at +5100' md 8-1/2" hole .0702 bpf, .3941 cuft/ft (10.3 ppg drilling mud) Open hole plug from TD to 10141' (tagged) cement plugs 9-5/8" @ 4795' md, 4112' tvd ID=8.681", cap=.0732 bpf, .411 cuft/ft 250 sx plug Class G + .4% CFR3 + .15% HR5 yield 1.15 cuft/sx RECEIVED MAR ~ ,~ 1992 Alaska Oil & Gas Cons. comrnissior: Anchorage Top of C sand 10294' md, 6833' tvd 225 sx plug Class G + .2% CFR3 + .25% HR5 yield 1.15 cuft/sx TD 10600' md, 7065' tvd EDF 3/23/92 ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT APPROVAL: 3R-10 NORTH SLOPE KUPARUK RIVER UNIT KUPARUK RIVER FIELD ADL 355023 ALK 3573 50-029-22253 92-26 ACCEPT: 03/12/92 SPUD: 03/12/92 RELEASE: OPERATION: DRILLING RIG: PARKER 245 AFE: AK 6578 WI: 55.252072 03/13/92 (1) TD: 557'( 557) SUPV:SMS/DKP DRILLING MW: 8.6 VIS: 85 CONTINUE MOVING RIG FROM 3R-20 TO 3R-10. RIG PUT ON STANDBY TO MIX MUD FOR DOYON 9. RIG UP TO MIX MUD. RIG TAKEN OFF STANDBY CONTINUE MOVE TO 3R-10. N/U 20" DIVERTER SYSTEM. MIX SPUD MUD. M/U BHA AND ORIENT MWD TOOLS. FUNCTION TEST DIVERTER SYSTEM. SPUD 12~75"~ DRILL FROM 121'-195'. SERVICE TOP DRIVE. DRILL FROM 19~ -5D7' DAILY:S92,936 CUM:$92,936 ETD:SO EFC:$1,882,936 03/14/92 (2) TD: 4133'(3576) SUPV:SMS/DKP DRILLING MW: 9.0 VIS: 62 DRILL FROM 557' TO 4133'. SURVEYING EVERY STAND AS REQUESTED BY ENGINEERING. DAILY:S59,126 CUM:$152,062 ETD:SO EFC:$1,942,062 03/15/92 (3) TD: 4810'( 677) SUPV:SMS/DKP R/U SWS FOR LOGS MW: 9.3 VIS: 40 DRILLED FROM 4133'-4810'. CIRC BOTTOMS UP FOR WIPER TRIP. HOLE TIGHT FROM 2550'-1634'. REAMED OUT FROM 2500'-2450' AND 2400'-2360'. BROKE AND CHANGED OUT SAVER SUB. CUT AND SLIPPED DRILLING LINE. RIH HIT BRIDGE AT 2165'. REAMED BRIDGE FROM 2165'-2500'. RIH WASHED LAST 50' TO BOTTOM. NO FILL. CIRCULATED AND CONDITIONED MUD. POOH FOR WIRELINE LOGS. R/U SCHLUMBERGER. DAILY:S56,903 CUM:$208,965 ETD:SO EFC:$1,998,965 03/16/92 (4) TD: 4820'( 10) SUPV:SMS/DKP PUMPING LEAD CEMENT 9-5/8"~ 4794' MW: 9.3 VIS: 40 RUN GR/CAL/BHC SONIC LOGS. TIH. TAG BRIDGES ~ 2590' AND 4085' AND REAM. NO FILL ON BOTTOM. DRILL FROM 4810'-4820' CIRC AND CONDITION HOLE. PUMP DRY JOB AND POOH. R/U WEATHERFORD. RUN 115 JTS 9-5/8" L-80 BTC CASING. SHOE SET ~ 4795', FLOAT ~ 4714' W/25' RATHOLE. M/U CSG HANGER, LANDING JT, CEMENT HEAD. CIRCULATE AND RECIPROCATE CSG TO CONDITION HOLE FOR CEMENT. PUMP 100 BBL FRESH WATER SPACER. PUMPING LEAD AT REPORT TIME. DAILY:S202,928 CUM:$411,893 ETD:SO EFC:$2,201,893 03/17/92 ( 5) SHOE TEST 9-5/8"~ 4794' MW: 8.5 VIS: 32 TD: 4830'( 10) COMPLETE CEMENT JOB. PUMP 100 BBL SPACER. 1655 SX LEAD SUPV:SMS/DKP CEMENT TYPE E + 1/4 PPS FLOCELE ~ 12 PPG 580 BBL SLURRY. 405 SX TAIL CEMENT CLASS G+2% CACL+i/4 PPS FLOCELE ~ 15.8 PPG 83 BBL SLURRY. DISPLACE W/ 347 BBL MUD. BUMP PLUG W/ 3000 PSI. FLOATS HELD OK. CASING WAS REIPROCATED UNTIL IT BEGAN TO STICK PARTWAY THROUGH PUMPING LEAD CEMENT AND WAS LANDED ON HANGER. FULL RETURNS DURING PUMPING LEAD CEMENT, BUT CASING BEGAN TO HANG UP WHILE RECIPROCATING 40 BBLS INTO THE TAIL AND WAS LANDED IN MANDREL HANGER. PARTIAL RETURNS DURING DISPLACEMENT W/ CEMENT TO SURFACE 150 BBLS INTO DISPLACEMENT. NO RETURNS AFTER 290 BBL MUD PUMPED, W/ TOTAL 100 BBL CEMENT TO SURFACE. CIP ~ 0835 HRS 3/16/92 R/D CASING REfEIV~D EQUIP. N/D DIVERTER. INSTALL PACKOFF, N/U 11-3/4'Xl1" 3M BRANDENHEAD. INSTALL VALVES AND PLUGS. N/U 13-5/8" 5000# BOP STACK. TEST CHOKE MANIFOLD, CHOKE AND KILL LINES TO 3000 PSI. AOGCC WAIVED LOPE TESTING AS PER DOUG AMOS. M/U BHA. ~A~ ~ 4 ~ RIH TAG CEMENT STINGERS ~ 4687'. CLEAN OUT CEMENT, PLUGS, FLOAT COLLAR AND SHOE. DRILL 10' NEW FORMATION TO 4830' 0i~& ~as0on$.6omm~sS~o~ BEGIN SHOE TEST. Anchorage WELL: 3R-10 ~-~ ...... OPERATION: DRILLING RIG: PARKER 245 03/18/92 ( 6) DRILLING 9-5/8'@ 4794' MW: 9.3 VIS: 34 TD: 8625'(3795) PERFORM LEAKOFF TEST: 750 PSI W/ 8.8 PPG MUD, 12.3 PPG EMW. SUPV:DB DRILL AND SURVEY FROM 4830'-8625' MD. DAILY: $57,140 CUM: $606,531 ETD:SO EFC:$2,396,531 03/19/92 (7) TD:10117' (1492) SUPV:DB DRILLING 9-5/8"~ 4794' MW:10.2 VIS: 44 DRILL AND SURVEY FROM 8625' TO 10,117'. ADT = 16-3/4 HRS DAILY:S69,839 CUM:$676,370 ETD:SO EFC:$2,466,370 03/20/92 ( 8) TD:10386'( 269) SUPV:DB LOAD SOURCE IN CDN TOOL 9-5/8"~ 4794' MW:10.2 VIS: 45 DRILL AND SURVEY FROM 10,117'-10,386'. ROP DOWN TO 2 FT/HR. POOH. L/D BIT #2 M/U BIT #3. DAILY:S63,498 CUM:$739,868 ETD:S0 EFC:$2,529,868 03/21/92 (9) TD:10600'( 214) SUPV:DB LD MWD & LWD TOOLS 9-5/8"~ 4794' MW:10.2 VIS: 41 RIH TO 9-5/8" SHOE. SLIP AND CUT 104' DRILLING LINE. BREAK CIRCULATION. BOP DRILL. RIH TO 10175'. REAM 10175' TO 10386'. DRILL AND SURVEY 10386' TO 10600' CIRCULATE BOTTOMS UP. POOH. L/D MWD, LWD, AND BHA. ANCHORAGE DISCUSSED P&A PROCEDURE AND GOT APPROVAL FROM MIKE MINDER OF AOGCC. DAILY:S120,064 CUM:$859,932 ETD:S0 EFC:$2,649,932 03/22/92 (10) TD:10600' ( SUPV:DB 0) RIH TO TAG CEMENT PLUG 9-5/8"~ 4794' MW:10.3 VIS: 47 RIH W/3.5" DP TAIL ON 5" DP. TAG BTM AT 10600'. SPOT OPEN HOLE CMT PLUG:225 SX G W/ .2% CFR3, .25% HR5. 46 BBL AT 15.8 PPG. PULL 12 STDS SLOW. CIP AT 1630 ON 3/21/92. CIRC OUT CONTAMINATED MUD. POH. RIH TO 9-5/8" SHOE. WOC. RIH TO 9456' & CIRC OUT HEAVY CONTAMINATED MUD. RIH. DAILY:S206,453 CUM:$1,066,385 ETD:SO EFC:$2,856,385 03/23/92 (11) TD:10600' ( SUPV:DB 0) RIH W/ 5" HWDP 9-5/8"~ 4794' MW: 8.5 VIS: 29 RIH TO 10112'. CIRC SOME CONTAMINATED MUD. NO GREEN CMT. RIH. TAG CMT AT 10141' SET DOWN 15K# AND SAW 500 PSI INCR IN PRESSURE BEFORE SD PUMP. TAG WITNESSED AND APPROVED BY HAROLD HAWKINS OF AOGCC. POH TO 5500'. SPOT 40 BBL HI VISC MUD PILL. POH TO 5100'. CIRC. SPOT OPEN HOLE CMT PLUG: 250 SX G WITH .4% CFR3, .15% HR5. 44 BBL AT 16.7 PPG. POH TO 4299'. CIP AT 16:00. CIRC SOME CONTAMINATED MUD. POH. LD 3.5" DP. PULL WEAR BUSHING. TEST BOPE, WITNESS WAIVED BY HAROLD HAWKINS. SET WEAR BUSHING. PU BIT AND BHA. DAILY:S94,339 CUM:$1,160,724 ETD:SO EFC:$2,950,724 Work complete on 3R-10 3/23/92. Sidetrack to 3R-10A begins 3/24/92. RECEIVED AIaska Oil 8, Gas Cons. Comrnissior, Anchorage UgLI, NN~ I,OCAI'~OH t FIdkGi~ZC DE~,,ZMT~ 29,43 tlIL~ 14,1~ 0 kiELL ~ LOC~T~ODh ~T(J~-$) 0,00 POINT(TIP) ~ ~ ~ 120.00 I~i. INATION 0.00 AZII't,ITH o,0o I,ATITU~(IV-S) o,oo I)g)MIT~(U'W) 0,00 MICJ OFILME RECEiVeD MAR P_ :5 1992 Alaska Oil & Gas Cons. Commission ~nchorage ft 220.00 199,43 2M,~2 37%61 470.30 ft ft ft deq 0.0 120.(X) 0.00 0.00 79.4 199.43 O,XO 0.16 89.2 2M,62 1.13 1,16 91.2 379,74 4,~ 2,76 ~0.$ 470.07 9,59 4.13 A2II;J~ N/-9 0,00 59.22 0.09 57.57 65.94 2o1! 60.11 4,58 !)~£ DIgPIJiCB'~T ar ~ZIWJT~ fr 0,~ 0.93 3,~ 8.53 ft ~e~ 10O~t 0.00 0.00 0 0,1! 29.61 1.13 ~.79 1.12 9,68 .~1,77 i,~6 5~.,81 92,5 5~..20 17.M 6,17 654,56 91,8 653,19 29,51 8,58 TM,2& 91,7 7~,~ 4S.~ 12,~ ~.~ a9.8 91%09 89.~ 17. iO ~),30 8.71 15,74 17.98 61,06 3,20 63,00 14,30 26,10 29.76 61,~ 22.03 40.75 46.3~ 61.61 3,~ 59,1:) 43,70 79,3~ 90,62 61.17 1111,~ 1207 1302.16 92.2 I007,70 117.93 18,40 57.0~ ~8.~ 103,2~ 91,0 1093,13 149.33 Z2.00 ~.31 76.03 129.37 96,0 1179,93 190,19 28,43 52,&6 99.98 162.4~ 94.6 12~2,14 23~,97 30,M 5i,61 128,64 199,48 94,5 1342,29 2M,a5 32,98 49,92 160,23 238,17 i18.70 60,44 ; .~ 2".J7.~ 57.18 2~J'. ~ 5~.07 2,42 1490,52 1583,~}6 1676.02 1767,24 1859.59 93,9 1421,0~ 337,78 ~,97 48,41 193.~ 276.M 9'{,0 1499,&?. 3{7,0~ 31.311 41,47 226.84 313,63 92,~ 1~,~ 433.~ 29,M 47,23 2f~,75 34~,27 91.2 1658,54 478,M 2%74 46.70 289.69 3~I,41 ~,4 1738,98 5'23,78 2%10 45,06 321,2~ 413,97 337,85 55,03 O,M 387,06 54.12 1.79 433.~7 53,39 ] ,AS 478.95 52,78 0,32 524,0i 52.19 I. t2 1954,98 2050,30 2142,~9 2332.5~ ~.4 1622,05 ~'0,04 29 95,3 1904,~ 616.78 30.04 92,3 1982,40 665,51 %.0 2060,3:{ 720,~ 3~.34 94.0 21~,95 77~,~ 36.43 44,14 354,45 446,89 42,79 389,X~ 479,.~ 42,13 425,82 513.15 43,M ~7,17 5~9.90 570,51 51.56 0.85 617,60 50,94 0,75 d~,~2 50.31 7~,49 49,74 1 ;r)T.94 49.3! 2426,80 Z517,6~ 2609,98 2705,9~ ?.796.32 94,2 2211.70 {,,~.77 36,~7 ~,8 22M,:~I M4,30 92,4 2'356.28 9~,64 37,16 96.0 2434.95 994.74 90.3 2~07.21 1047.51 36.~ 4~,32 ~47.10 629.2~ 43,51 ~.M 667,23 40.10 6Z~.29 704.27 ~0,00 671.52 741 41,2'3 712,&8 776.7~ {)33.83 48.99 M7.74 4~,72 i,J3 943.13 48.31 1000.34 47,83 1(754.16 47.4~ 2~90.57 3O78.60 3173.2~ 3244.71 94o2 2~,49 IIO~,M 37,09 39,69 7~,81 93,8 2~7oM 11~',I1 ~.2 41.~ 798.~ 94,3 ~,M ~10.~ ~.~9 44.~ ~.47 94,7 ~1,96 ~,~ ~.~ ~,33 8~.~ 91.5 ~.~ 1317.~ ~,M 43.10 916. 849.81 962,77 1166.10 46,7~ 1274,~8 46.53 1328,94 46.42 3358,72 3452.53 3545.84 3439.~ :1732.14 94.0 2961,11 1372.96 36.44 45,36 956,26 93,3 3111,91 IM2,30 34,22 43°99 I035.55 93,4 3182,31 15'36.64 36.17 44,32 107~,10 93,3 3242,65 1590,9~ 36,16 44,73 1114.3~ 104Io06 1079,,12 1117,63 11~6,43 13~,01 46,34 1.50 1~).~ ~,12 0.22 160~,96 46,06 0,26 ~RGir; NJ, ~'~Y C~UII~?ICl6 E/-W ft ft cie~ 11~,69 1441,43 4,S,03 I2'34,78 1714.09 ~,,02 1274,40 1772,03 45,99 1313,92 Ii2B,20 4~,95 1,~3,26 1884,0~ 45,91 0.55 0,66 0,70 4293.2~, 43~.34 4~'2,09 91,$ 3714,22 92,1 37M,41 92,7 ~-~'.2,44 74,0 3937,~ 92,2 4010.84 1919,39 3~,94 46°34 134~,9S 177'3,30 36,69 44,09 1387,40 2028,26 37,34 43.42 1427,73 :L4)M,09 37,09 42,~ 1469,34 213~.68 37.0~ 43,64 I~C9.92 1391,82 19'38,27 1~,~2 1992,80 45.88 I4~9.13 204~.~ 4~,82 I~7,88 210~,39 45,74 1545.82 21,~,89 45.67 1,42 1,,~7 0.6 0,74 4724,00 48~9,71 49~3.78 ~7~.7~ ~172,71 ~9,8 4058.44 1&$,7 41M,37 94.1 42~.40 ~,0 4331 94,0 4398,9~ 2174,28 37,31 45,21 153~,72 2276,~' 39.41 Z336,49 40,66 4~.13 239%36 42,~6 ~.~4 16~7.70 24~,~1 45,4~ ~0,47 1571.1! 2197.00 45,6~ 1645,94 i~99,81 45,70 1691,01 ~,~ 45,76 5266.~ 5'360.~0 54~2,5S ~641,02 ~?19 6013,3~ 610'J,12 94,I 4463.:~ 94.0 4~24,1~ 91,$ 45~0o93 94.3 G,44 94,2 46M,~ 93,7 4736,42 92,3 4779,~7 93,9 48.~, 14 91,8 4~92,79 2~33.09 M,40 50,00 1773,17 2676,~0 $2,79 ~, I2 I~2,98 27'J2.77 ~.0~ ~6.~9 1906,83 2531,04 57.69 §7.~ 1949.23 2911,3~ ti).gi 5~.71 1~1,~1 2992,80 ~,71 ~,30 2034,~ 3076,~ 44J.1 ~,14 207~,~1 3162,03 66°40 ~8,94 2123,21 3245,84 44,44 ~.~3 21~,80 I842,04 ~}6,~ ~.0~ 3.1~ 1897,28 242~. 16 46.21 2 ,.~. I~4,17 26~,~ 46,37 2.~,3 21.~, 98 2931,3~ i7,20 Z220,63 3011,$2 47,5I 22~1,~ 309'3,~ 47,$0 236~.18 317~,3~ 2437,12 3261,07 48,36 3,5I O, ~1 0,31 6191,S0 93,4 4930,16 ~.1 4967,03 92,8 5004,1~ 94,! ~041,8~ 92,0 3331,15 ~,3~ ~.37 ~1~},26 44.~ ~.49 2255.69 3~00.13 M,~ 57.76 2'300.42 3670,05 44.02 ~.01 2391 ~10,09 3'34),3~ 4~.62 2~1 .~9 3428.S3 2654.2~ ~12.~4 49.08 2727,14 ~97.7'3 49. ~ ~98,44 3680.96 49. ¢9 ':, 23 ,:',, 73 O. ": 6~47,33 6939,61 7033,9~ 71~,,90 7223,14 177.8 $190.Z4 92,3 S2~5.91 94,0 9~.2 39~,44 M.81. 60,a?. ~,~. 4007.~6 ~7,70 61,72 2561 4094,39 67.76 61.31 2603.37 4110,~ 67,~ 4,1,~1 Z644.94 4267,M ~7.$2 ~.~ 2M7.34 3017,62 3~31 ,~ 50, 3.3 3~92,24 4015,~2 50,34 3168,97 4101,21 50,60 324~,~ 4184,60 50,82 ~,41 4~3.19 51 7316.64 7407,22 7501,08 ~93,52 93,$ 5369,~8 90,6 ~,03.8U 93.9 ~439,19 92.4 )473.96 93.3 43~3,57 67,~ 61.39 ZT'~ .07 4436,69 67,~3 61,06 2769,40 4~,94 67,M 61,~ 2811,3~ 4607.93 67.95 60.91 2852,84 4~93,79 4~,01 60,65 ~8.08 43~4~.~ 51,23 3471,54 44,40,85 51,42 ~,~ ~11.~ 51 3698.11 ~96.$2 51 ,~4 4 ft' ft 7761,87 ~,! 7873,02 91 o2 7964.3] 91.3 ~12.06 8059,2I 74,9 5646,74 8I~3.31 94,1 D~TL~£ DIS~DKI' at AZIMUTH !('(]f .r a247,43 &'.'.'.'.'.'.'.'.'~), 6 $ 6524,61 ~617,49 8~I0,23 90M.27 94.1 93.3 5740,52 91,7 5839.9'3 92,9 92,7 ~20,92 94,4 4007,43 ~,9 4049.Z) 94.6 40~,42 5209,40 65.18 6~,37 3151.49 5--~2,70 64,44 63,75 3189,72 5374,76 64,39 62,86 37..27,0e 5456,52 64.51 62.4'3 2265.0~ 5539.46 64,65 62,52 3303.~1 %21,6~ 62.70 62.3~ I142.31 5705,46 ~2.&l ~1.57 31~2,06 ~7~,71 ~,~ 62,~ ~21 ,~ ~1,69 ~.~ ~1.~ ~,76 61,~ 61,70 ~,~ 4149,2~ 5210,39 52,98 4~4,47 529~, 44 52,'~ 4~0,79 5375,28 53,10 4372,27 54~,1t7 53,~ 4446,67 5539,70 53,39 4520,36 5621,60 53,52 459~,04 570~,52 53,45 4669,20 57M.73 53,77 4743, ~ 5871.69 53,88 4417,19 )954,76 52,~9 2,il 0,74 ':;. 70 1,77 91~2,3Z 9274,.'.3 9'367,16 9460,7? 9555.89 94. L 6137.92 92,2 6181,18 92,6 6224,90 r3,6 6271.27 ~.1 6321,60 4036,94 61,a4 &l,15 3540,21 6117.72 62,13 60,64 3~79,79 6198,92 61,5'"J 59.44 36g0,~ 6279,99 59,07 57,31 3663,~ &3&O.59 57.02 55,97 3707,60 4890.00 6036,98 54,10 0 4961,10 ~117.79 54,19 0,57 ~1,85 6199,04 54,26 1,30 ~101,10 62~0,16 54,32 3,31 5164.49 6360,78 54,~ 2,~ 9649,62 9743,54 9834,77 9926,06 10021 ,~ 93,7 6375,00 93.9 6433.77 91,2 6495,73 91,3 6561,;~ 9~.~ 6631 64:37,56 53.50 4,510.78 46,99 52.87 3793,9~ 6577.69 45,44 51,aa 664I,~ 42,83 51,8,4 3874,3I 6705,83 42,32 53,43 3913.:~3 52'32,07 6437,77 54 ,'~ ~1,38 6510,99 54,36 5344,31 ~77,~ 54,34 5~4,~ 4641 ,~ 54,31 ~,~ 67~.~ 54,~ ~,~d 2.65 10114,~ 1020%33 10279,65 1047~,42 ~.2 6700,82 94,6 6771.16 70,3 6823,09 102,9 6699,19 93,9 6970,15 4.744,17 41 6831 ,~ 42,21 53,43 3~.~ 6478.~ 42,~9 53,~ ~16,87 4948,02 4~.~ 53.17 ~.~ 54~,$9 6764,32 54,~9 ~.29 68.31,54 54,26 55~4.~ ~78,94 54,~? 5~3~,75 69~,16 54,26 5689,64 7009,64 54,26 I(>401,00 124,6 7065,85 7089,37 39.81 55,~ 4139,7+ 5755,32 7C~9.52 54, L~. :;,' ': AOGCC GEOLOGICAL MATERIALS INVENTORY LIST COM,L~,O. ~^~ ~ ~, co. com^c~ ' ~rm ' received receiYe'd dale comme"ts ' ~ - ..... -~- ............ ~! ................. i i ~i~; ....... ~ no .,~//~.Z/~,.~..- complelion rep°. , , 403 yes no sund~ application 404 yes "' no repo~ of sund~ application Op~- .....~.eq.ui~.~j--. -r~-~:~i~,-~-d c~S-~ requi~e(i- rece'iV~i' Proq~'~i~]} ~i-~hed receive~ hole log hole loft log MUD GCT 1'EMP DII_/SFL CNL PROD DLL CHI' PRESS BHC/SL ~ .,~//' CET SPINNER _ .-4 ~'-- ~-~- ............. J ..... L __ ___ .J- ................ BHCIAC ER OTHER DATA LSS PEFIF SUrvey nEC ~// v~/' .............. SSS PACKER Digital , Data , _ FDC- Well CNI_. Tests FDc RWD required reCeive~ 8AMPLES requi~ed 'received MWD LDI/CNL i dry ditch "' core .... M, c,~,~' "/' "/ ..... CYBER LOOK C~ ~ ~ ~"'" Analysis NGT MEMORANDUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnle C TO: Commissionei- ~ DATE: March 23: 1992 FILE NO: hh3 2 3- 6. doc THRU: FROM: Blair Wondzell Sr Petr Eng Harold R Hawkins Petr Inspector TELEPHONE NO: SUBJECT: Rig/BOP Inspection & Plug Back of Parker 245 AAI KRU 3R-10 Permit 92-26 Kuparuk Rv Field ~3~11~_ March .22L~ I witnessed a rig/BOP inspection and I witnessed a plug back on Parker Rig 245 for AAI KRU 3R-10. I witnessed a tag at 10~141 feet with 15,000 pounds of weight. The plug was from 10~600~ up to 10,141', 152 foot pl[tg. I filled out an AOGCC field report which is attached. In summary, the rig/BOP inspection and tag on the plug back was satisfactorily performed. Attachment 02-001A (Rev. 6/89) 20/11/MEMO1.PM3 / OPERATION: Orlg j/ Wkvr UIC Operator ~ J ~ ~ Permit # ~-j~ Location: Sec ? Location {gen'l) ~~ Well sign I N COHPL I ANCE; yes ~ nya A. D IVERTER 1.() () ~/) 2. () \( s.() ) 6.() 7. ( ) ) () () ~. (~) ( ) s. (~) ( ) 6.(~ () 7..~) () 8. ) () () 10. (~) ( ) 1~. (X/) ( ) 12. (1{) ( ) ~3. ~) ( ) l~. (TJ ( ) is. (~) ( ) () 2. (~) ( ) 3. ()(} ( ) ~.(~) () s. (~) ( ) 6. iX) ( ) 7. (t() ( ) 8. (X) ( ) 9.0) () 10. (~) ( ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Walk-Thru Inspection Report Well name ~,g--/~ Representati v; line sz & length line conn& anchored bifurcated & dwn wind 90° targeted turns vlvs: auto & simultaneous annular pack-off condition B. BOP STACK { ) wellhead flg wkg press ( ) stack wkg press ( ) annular preventer ( ) pipe rams ( ) blind rams ( ) stack anchored ( ) chke/kill line sz . ( ) 90~ turns targeted (chke & kill ln) ( ) HCA vlvs (chke & kill) ( ) manual vlvs (chke & kill) ( ) connections (flgd, whd, clmpd) ( ) drl spool ( ) flow nipple ( ) flow monitor ( ) control-lines fire protected C. CLOSING UNITS ( ) wkg press ( ) fluid level ( ) oprtg press ( ) press gauges ( ) sufficient vlvs ( ) regulator bypass ( ) ~-way vlvs (actuators) ( ) blind handle cover ( ) driller control panel ( ) remote control panel IN COMPLIANCE; ~es no n/a il. (~) ( ) ~2. (x) () 13. ~7~) ( ) ~-~) () 2.. ) '( ) 3. iX) () ~. (y) ( ) s.(A) () 6.(~) () 7.(~) () 8. (;0 ( ) 1~ (~'~) ( ) () ~. (~) ( ) 6.(x) () 7..(3) ( ) 8. (y) ( ) 1.,(~J ( ) 2. (y) ( ) 3.(x) () ~. (~) ( ) s.,. (~) ( ) 6. ( ) 7. (j() ( ) ( ) firewall ( ) nitrogen power source (back-up) ( ) condition (leaks, hoses, etc) D. MUD SYSTE~ ( ) pit level floats installed ( ) flow rate sensors ( ) mud gas separator ( ) degasser ( ) separator bypass ( ) gas sensor ( ) chke In conn ( ) trip ~ank E. R'~ FLOOR /,"~'~... ( ) kelly cocks (upper,lower~lBOP)__~ ( ) floor vlvs (dart vlv, balT-~l~) ( ) kelly & floor vlv wrenches ( ) driller's console (flow monitor~ flow rate indicator~ pit .level indicators, gauges) ( ) kill sheet up-to-date ( ) gas ~etectton monitors (HS & methane) ( ) hydr chke panel ( ) chke manifold F. MISC EQUIPMENT ( ) flare/vent line ( ) 90° turns targeted (dwn strm choke lns) ( ) reserve pit tankage ( ) personnel protective equip avail ( ) all drl site suprYs trained 2for procedures ( ) H S probes ( ) rig housekeeping Date of last BOP inspection: Resulting non-compliance: //4 Non-compliances not corrected & ~hy: ~"/.~ Date corrections will be completed: BOP test & results properly entered on daily record? Kill sheet current? C.0013 (rev 03/29/91) Inspector ALASKA OIL AND GAS CONSERVATION COMMISSION March 6, 1992 WALTER J. HICKEL, GOVERNOR · 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 A W McBride Area Drlg Engr ARCO Alaska Inc P O Box 100360 Anchorage, AK 99510-0360 Re: Well # Kuparuk RiVer Unit 3R-10 Company ARCO Alaska Inc Permit ~ 92-26 Surf Loc 1716'FNL, 2~50'FWL, Sec 9, T13N, R9E, UM Btmhole Loc 2388'FSL, 2762'FWL, Sec 3, T13N, R9E, UM Dear Mr McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does'not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed bef6re drilling below the surface casing shoe must be given so that a representative of the Com- mission may witness the test. Notice may be given by'contacting the commission petroleum field inspector on the North Slope pager at 659-3607. Alaska Oil as Conservation Commission BY ORDER OF THE COMMISSION jo/encl c' Dept of Fish & Game, Habitat Section, w/o encl Dept of Envirol%mental Conservation w/o encl STATE OF ALASKA ALA.~ J~ OIL AND G/~ ~ERVATION COMMIS,.. ~N PERMIT TO DRILL 20 AAC 25.OO5 ,, 1 a. Type of Work Drill X Redrill D I b Type of Well Exploratory r~ Stratigraphic Test r~ Development Oil X Re-Entry D Deepen D Service [~] Development Gas [~] SinclleZone X Multiple Zone r'~ 2.. Name of Operator 5. Datum Elevation (DF or KB) 1 0. Field and Pool ARCO Alaska, Inc. RKB 52', Pad 11' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 355023, ALK 3573 4. Location of well at surface 7. Unit or property Name 1 1. Type Bond (see 20 AAC 25.025) 1716' FNL, 2350' FWL, Sec. 9, T13N, R9E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 2200' FSL, 2440' FWL, Sec. 3, T13N, RgE, UM 3R-10 #UG30610 At total depth 9. Approximate spud date Amount 2388' FSL, 2762' FWL, Sec. 3, T13N, RgE, UM 3/6/92 $200,000 1 2. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 3R-11D 10,542' MD 2892' (~ TD feet 25' @ 500'MD feet 5175 6r995' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 500'MD& feet Maximum hole angle 66° Maximumsurlace 2440 osla At total demh ~TVD~ 3338 4789'MD 18. Casing program Settin~l Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Couplin~l Length MD TVD MD TVD (include stage data1 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' :1:200 CF 12.25" 9.625" 47.0# L-80 BTC 4748' 41' 41' 4,789' 4,122' 660 Sx Permafrost E & HF-ERW 400 Sx Class G 8.5" 7" 26.0# J-55 BTC 10501 41' 41' 10,542' 6,995' 190Sx ClassG HF-ERW Top 500' above Kuparuk 1 9. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented I~e~,~Jrj#;;[ (~ot~ ~, # ~i.- Tl~,[e Vertical depth Structural Conductor Surface Intermediate Production FEB 2 8 1992 Liner ,~Jaska 0il & Gas Cons. C0mmissi0~ Perforation depth: measured true vertical Anchorage 20. Attachments Filing fee X Property plat [-] BOP Sketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot D Refraction analysis D Seabed report D 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge ,.Si.qned ~,~/~J? /~~~,-~ Title Area Drilling Encjinoor Date / I ;oPI- <~m~'~r~ C°mmisii°n Use Only' I / ' Permit Number n Approval ~ate/ See cover letter fo ?~'~ -- ~ ~ ~ ~ ~'* ~" ~"~r '~/ ~' /4 ~-- other re(~uirements Conditions of al31::)roval Saml:)tes re{3uired r~ Yes ~ No Mud Io{3 re<~uired r~ Yes ~ No Hydrogen sulfide measures r~ Yes ~ No Directional survey required ,~ Yes ~] No Required working pressure forBOPE D 2M J~ 3M C] 5M D 1OM D 15M by order of i /. Approved Commissioner the commission Date~_"t//__/,~ ,~ Form 10-401 Rev. 7-24-89 ~.~~ Submit in triplicate DRILLING FLUID PROGRAM Well 3R-10 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing 9.0-10.0 15-35 15-35 50-100' 5-15 15-40 10-12 9-10 10% _+ Drill out to weight up 8.6-9.3 5-15 5-8 30-40 2-4 4-8 8-10 8.5-9 4-7% Drilling Fluid System: Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD 10.2 10-18 8-12 35-50 2-4 4-8 4-5 9.0-9.5 <10-12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 2440 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest well to 3R-10 is 3R-11D. As designed, the minimum distance between the two wells would be 25' @ 500'MD. The wells would diverge from that point. Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well or will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 175 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds. RECEIVED Alaska 0il & (~as Cons. A CO ALASKA, Structure' Pad 3R Well' 10 Field ' Kuparuk River Unit Location · North Slope, Alaska Created by : jones For: E FITZPATRICK Date plotted : 25-Feb-92 Plot Reference is 10 Version #6. Coordinates are in feet reference slot ~10. True Vertical Depths ore reference wellhead. I-$/~ EASTM A N ~Z/LI~CHRISTE NSEN A B~ker Hughe~ e~mpen¥ Scale 1 ' 250.00 East --> 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 60DO I I II II II II II II II II It II II I 45D0 TD LOCATION: J 2388' FSL, 2762' FWL [ ~ / 4000 I SEC. 3, T13N, RgE I 55O0 N 53.9 DEG E 6646' (TO TARGET) ~ 3000 / 12200' FSL, 2440' FWL I - ~ ISEC. 5, T13N, R9E I / TARG~ F SURFACE LOCATION: 1 / ~=6577 J1716' FNL, 2350' ~LJ / TUD=9981 15~ L SEC. 9, T13N, RgE I / DEP:6646 KOP ~D 500 TMD 500 DEP 0 ~ ~ 15.00 BUILD 3 DEG / 100' ~200- ~ 21.00 _ ~ 27.00 ~00, ~ 33'00EOC ~1 WD=1623 TMD=1700 DEP:359 ~B/ PERMAFROST ~D=1697 1~D=1792 DEP=413 2ooo: 2~oo- ~ AVERAGE ANGLE ~ 30 DEG 2800- ~ 1/ UGNU SNDS ~D=2772 1MD:3121 DEP=1182 - 3200- T/ W SAK SNDS D: = : 3SO0- W 3572 TMD 4110 DEP 1755 ~ B/ W ~K SNDS WD=3992 TMD=4629 DEP=2055 4000- ~X K-10 ~D=4002 TMD=4641 DEP=2062 / L ~ 9 5/8"CSG PT - KOP ~2 ~D=4122 TMD=4789 DEP=2148 49.69 ~D=4792 TMD=SB62 DEP=29~7 4800 - _- 65.93 5200- ~ M~IMUM ANGLE 6600 - 6000- _ 6400- ~ ~ O0 6800- B/ KUP SNDS - END O~ D~OP ~=6842 YMD=~0542 DEP=6889 ' TD / LOGGING PT ~D=6995 ~D=10542 DEP=?01? 0 ~0 8~ 1200 1600 2000 2400 2800 ~200 3600 4000 4400 4800 5200 5600 6~0 6400 6800 7200 Scole 1 ' 200.00 Verticol Section on 53.90 ozimuth with reference 0.00 N, 0.00 E from slot ~10 Scale 1 : 50.00 East 150 1 O0 50 0 50 1 O0 1 50 I I I I I I I I I I I 1 ARCOALASKA, Inc. //~ Sh, ucdure: Pad ~R Well: 10 //~oo Fldd: Kuparuk River Unit Lo~athm: Nerlh Slope, Alae4ca ~00 2OO I 2300 5300 250 I I 17OO 1300 300 I~1700 1 $00 1900 I00 2787 3100 RECEIVED FEB 2 8 ~992 OJJ & Gas Cons. Commission Anchorage 300 I,- 200 150 100 50 0 50 100 150 200 250 300 I I V o . , . , . . . = 10. 11. 12. 13. 14. 15. 16. 17. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 3R-10 Move in and rig up Parker Rig 245. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (4,789') according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2,000 psi. Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole logging while drilling to total depth (10,542') according to directional plan. Run and cement 7" casing. Pressure test to 3,500 psi. ND BOPE and install lower production tree assembly. Secure well and release drilling rig. Run cased hole cement evaluation and gyro logs. Move in and rig up Nordic Rig 1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. F~_B 2 ~ ~992 .'~[aSJ~. OJJ & Gas Cons. Commission Anchorage 7 , 6 5 4 3 2 13 5/8" 5000BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2- ASSURE THAT ACCUMULATOR PRESSURE IS 3(X)0 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2_ CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TESTALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3(X)O PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE LINE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE UNES. 7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. CONTINUE TESTING ALL VALVES, LINES, AND CHOKES WITH A 250 PSI LOWAND 30(X) PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST 8. ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST BOTTOM 9. RAMS TO 250 PSI AND 3000 PSI. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. 10 CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD 11. AND 12_ UNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE 13. DRILLING POSITION. TEST STANDPIPE VALVES TO 3000 PSI. 14. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16"- 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5000 PSI SPACER SPOOL 4. 1:~5/8" -5000 PSI PIPE RAMS 5. 13-5/8" -5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5000 PSI ANNULAR FEB 2 8 1992 Alaska OJJ & Gas Cons. ~;ornmission ~nchora~e ,~JPARUK RIVER UNI~ 20" DIVERTER SCHEMATIC 5 6 4 3 DO NOT SHUT IN WELL UNDER ANY CIRCUMSTANCES MAINTENANCE & OPERATION . UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16"CONDUCTOR F~_B 2_ ~ 3992 2. SLIP-ON WELD STARTING HEAD 3. FMC DIVERTER ASSEMBLY WITH TWO 2-1/16"- 2000 PSI BALL VALVE 4. 20"- 2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. ~,nc~ora,.qe 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20"- 2000 PSI ANNULAR PREVENTER SRE 2/6/90 ** CHECK LIST FOR NEW WELL PERMITS ** [-9 thru 13] ' [10 & 13] (4) Casg ~/~.~.~/~-~. ~-~_-~ ~ [14 thru 22] ( 5 ) BOPE s/,, ~.~q~,(/, ~'W~ ~-~ - [23 thru 28] (6) Other Company Lease $ Well (6) Addl 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. ~) [29 thru 31'] 30. 31. Does operator have a bond in force .................. ' ................. Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease n~nber appropriate .......................................... Does well have a unique name & n~nber ................................ YES ,,~' Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to 3ooo psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. REMARKS //. Zl_/, / geology' DwJ -- eng j nee r i ng.;~G HTH ~ LCS -~' BEW-~'- RADS') rev 03/29/91 jo/6.011 INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA SHORE /-o,'/ Additional remarks' Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX.. .. No special 'effort has been made to chronologically organize this category of information. ****************************** APl ~6E~ : 50-02S-22253 RECEIVED APR 0 6 1992 Alaska Oil & Gas Cons. Commission Anchorage [$ ~'ar;e verif!.¢a, tior~, !.~istino :hlUmber~:!er ~laska Cot?:put:inq Center 3i-N:AR-!992 i. 0:55 PAGE: DATE : 92f03/31 RBEL ~-~A~E : 92223 C0~:4~E~7' : ARCO)~I.~$KA .!,~4C., 3R-!O~ KUPARUK RJVER, 50-029-22253-00 DA'i'E ; 9210313~ OR IGI~.] : FbIC TAPE ~A~'E : 92223 COp.~E~)T : hi, CO AI.ASKA !~.~C., 3R-.10, ~UPARLi~ PlVER, 50-029-22253-90 FTT.,P: ',' E[~T'T,OO! b0-O29-22'P53 T,f)(:,fl!~,.t.; ~:F',iL}., [~RiI;!,TP!G PESi. STIVIiY/GR 4794' T~ 1(';576' I.,OGGING ~::-~HI[.,~.: ORIbbT{,,g ~'~F:UFRL)N/DEb!SIT~' 4794' TO !051.8' T U ?~i I VA b U D E F I T Y P E AR. CJi ~.bASKA, .I~C, Company .Name ~,~,a 3R-! 0 Well Name ,~,P!~ 50-02q-22253 AP1 Serial ~,~umber FL 1716' ~L ~ 2350' Fwb Field Loc~tion SECT 9 Section TP~s~ ! 3N Towns~l.p ~ ~ ~,i C 9 E R a n q e 8~'n,T ~[,ASKA State or Province ;:~i ~, T ] t.~8 A. Nat i on h~ T ~ t, at i t ude !,0~ 6 bong I tude ~I'T~ ~Itness' Na~r~e SO~ 54:9007 Service Oraer Number pi) ~7: ?~SL Permanent datum ~]PD FT O, Elevation ot Perm, Da L~:~F ~:f~ LOa ~easureO From ~P{> FT 52, ABOVE PER k~A,{~ENT ~:.~KO FT ,52. Elevation of. K. ellv Bu E:[)i;~ ET 5~, Elevation o~ Derrick ~TG!., ?T }1 El. evation of (;round ~[:n~[.~ FT .0,~00. Total DePth - Driller ~'Ob vT 1(.)~00, 'fetal Depth - hogoer BLi gT 10600. ~ottom Log Interval TL! FT 4794. Top !,on Interval DFT GEI,/LIO Prillino Fluid TVr, e [SV[; G/C3 10.2 PrJ. l. linq Fluid Oenslt O F F~ ["~ 9,5 Dr il.. l, in~ Fluid [')FY CP 33 Drillinq Fluid Viscos OFI.~ F3 :15~ Ori.llinq Eluici boss P~"S [tH~';~,~ 2,17 tiesisttvity o~ ~t]d Sa ~S'I DF,(;F 65, ~,.]d Sample '!'emperatur F~.~F'S Oh;'~?~ O.g3 ~tesistivitv of mud fi :~F,~T [;~C;~.' 65, ~itld Filtraie Sample T ~'CS 0~',~- ~esistivity of ~,~ud Ca ZONE t-.~f'tSV ~.:~:d~ ~qd Cake Sample Tempe ZONE s'rE~< okigF O, Surface Temperature ;:~t~"F ~)ECF !5'i, Bottom Hole '.i"emDeratt] IS Tape Verification i".~istin~ ;bl. Un, ber<~er Alr'J. sx.a Computinq Center !0:55 PAGE: 3 B u 3. },: Oensity :>e!ta Pnotoe!ectrJc Factor [)ifferentiai Caliner Pensit~ Paros :Lty Densit.~ Poroslty Ot~tptit t~'om .8. n Ap~:lication Proqram q"hermal r, ieutr'on PoroStt:y ¥"er i fication List. inq Alaska Comcutimq Center 31,-~AR-!992 10;55 ,t 9 o 07 00 000 00 0 1 I 1 4., 68 © 000000000 49()07 O0 GO0 O0 0 1 I ! 4 ~8 0000000000 49007 O0 000 O0 0 I i 1 ~ 68 0000000000 ~}9007 O0 000 O0 0 I 1 ! 4- 68 OOO0000000 49007 O0 000 O0 0 I I 1. 4 68 0000000000 49007 O0 000 O0 0 ! 1 4 6~ 0000000000 49007 O0 000 O0 0 1 ! ! 4 6a 0000000000 49007 O0 000 O0 0 ! ! ! 4 88 0000000000 40007 O0 000 O0 0 I ! ! 4 6~3 0000000000 49007 00 ~" ' . . O 00 00 0 I I ~ 4 6 ~ 0000000000 .49007 O0 000 O0 0 !. ~ 1 4 68 OOOO000000 49{:,0V O0 000 O0 0 ! ! i 4 ~g 0000000000 49007 O0 000 O0 0 I 1 ! ~ 6g 0000000000 ** 9ATA ** DFp~r, 10bOo,, Pt<~,. b?iD -999, T $ PI-!. L";< i"', 39, !~ F p 'r, 1. 0 3 n t'), ~.; 03 R 0 S 2. [: w ti:, - 999.250 P. ii t39,15 ¢; 0 - 999.25 O D R H 0. L w D .......- 0 [)P !, t..,~40 ' D 2~0 OC~,L 1.,~ ~' ' ' ~,., q99,2~{ .. H -999 250 POR,L~D 250 AT~P.!i.~D '999.250 PSa.'bqO -999. 250 250 {; 00 R 0 S 2. L ','~ 2 ..2.. 3 b 2 P ii 0 ~,. I., W ii') 2.3 i52 a 2 t [}CAL,. i.,w[) O. 090 DP~ I.t.,',iD 0.162 400 ATR. b~.O 3.215 PS [~. L,,~ [) 3.518 094 ',.;('~: ~ OS ?. !.,,~.i 0 2.559 R }i,,.q t.?. b v; i) 2.559 420 [~C~!,. [.~; [: I .003 DPH I,/,,.~ D 0.055 'Ina AI'F. L~ ['., 2.607 pSR, i~'¢i) 3.269 ROP~.I,~D -999 2.50 -999:250 35.714 '999,250 '999,250 32,967 0.018 0,107 0,012 0,162 23.802 0,000 -0.I$4 33.450 0,010 O,OSb 25.662 [$ 'fane VerificatJ. on !..,istina _-bt, nmberqer Alaska Computinq Center DEc1', 98n0.009 RI:IS 2, Lw[} PLF,L~D 3.349 T ~..~ p F!. [.:.w 0 ~7. 400 hTR 3 !-i~A R-.,t, 992 !{:):55 2,5 ~ 3 R i,! 0,655 OPPI'L~D !, 584 2.395 0,381 DPBI, L,~D 1,458 0,567 !. ,752 2,450 RF!Oi!:,b~D 0.259 D!:>HI.,LWD 1,939 PS~.LWD 0.013 [) P H I.. b ~! 9 2.3~4 0.032 9PH!..L~O 1.658 PSR,bwD O, !. 31. DPH!. LWD 3,27 g PSR. L~',O 2.409 0.0 ¢ 0 I ,766 0.000 1.693 2.406 0.0.i6 DPH 2 o 5.6, 3 0. ()5 '3 1.697 2.395 0.155 1,587 2,585 0,039 1,78~ 2 4.06 3,070 2,450 0.12! 2.393 437 1.29 3,749 2. 384 0.161 1.691 2.434 O. 131 3.398 2.409 0.!46 2.242 2.392 0.!62 2.211 2.466 0.!!.t 3.glo ORtiO. L~D [)POR, LwD ROPE. L~D D R H 0 o L w D OPOR. LWD R O P E;, L w D D P U R. L W D 0 R H 0.1, i,V O ROPE. b R H 0 D P O R ROPE t) R H 0, L x [) DP[3R. L~D ROPE.Lt'D 0 R H 0. I., ,~ D RnPE.b,D OR t-iO, ~'OPF.LCD [)PHD. L~D DPC, R. 0,013 0.O53 38,7!0 0,0t9 0.!55 50,56I 0.016 0.039 75,398 0,00! 0,148 99,997 -0.003 0,121 88.830 0,005 0.129 16,048 -0.018 0.161 107.565 -0.002 o,131 39.495 -0.012 0.146 195.617 -0.012 0.162 2!4.326 -0.006 0,Ill 190,085 :S 'Tape veri~i, cat:lon i..istJ.nq :blumberger AlaSka Computing Center 31-MAR-i. 992 t. 0:5% 2.499 RM[]FS. LwD 0.1.68 DPHI.LWO 3.118 PSR, [,,,x 1) 2. 462 R}{OB. LWO 0.!06 DPBI.LW9 3,056 PSR. bWO 2.494 0,172 3.47 $ PSa 0,025 3.305 2.440 0,1.15 2.~93 PSR.L~D 0.049 DPBI .LWD 2,~58 PSR,i~wo O. 236 .DPHJ.~, bWt) 2.85.1. 2.4o! RHOB.Lt~i~ O. 00{, OPHI .LWD 3.377 PSR.bWD 2.433 0.000 3.22 g 2.,,44'7 Rt!Oi3. I.:W[.) O. O00 DPH !. !,wi> 4.01,5 PSR. Lw{.) 2.499 0.092 3.303 2,462 0 114 312 9 2.494 0.095 3.499 2 433 0; 1 32 3,58 g~ 2 44.0 0:127 3,159 2,41.1 0 145 2,476 0. ! 05 2.a48 2. 440 0 127 2.'. ai 2,40! 0o15! 3.705 2.4313 1.32 2 447 ~i23 4.614 D R ~! 0, L w D DPOR, L WD DRHO. LWD DPOR,LmD ROPE,L~D DP(jR, ROPg. ?)R i.{O DPCiR ROPE DPOR, b~iD R O P E * L ~; D OR. HO. LWD DPC!R.L~D ROPE. bz~D DR,hO. D P [,,! R, L ~'~ D ROPE.I,~D 15 R H 0, L ~ D DP(JR. R F!P E:. L DPOR. L~';D !)R ?iD. DPOR .!,WD ROPE.L?~D PAGg: 0.092 183,677 -0.01,0 0.!l, 4 !76.552 0,001 0,095 206,273 -0.010 0.i32 206,273 o:i, 244,781 -0.003 ~,145 22 ,986 0,00! 0.105 91,839 -0,004 0.127 288,000 -0,005 0.151 362,544 -0.003 0 132 -0 019 o:12 278,769 0£~'0 t00'0 ~L'~£ ~00'0- g~8'Y~£ 600'0- 800 0 OgS"l:St °0 ~[~'0- 000°0 800'0- LI'O C6~'LOF~ 0 u q ' 3f3d(] O~,q ' 8!3dq d*¢q' 'iUdC o~q ' 8D:dd 0 ~a. q ' 0 H 8 O (1 ~"I ' 3d08 o~.q 'OHSO oaq'sd08 o~q'SOd~ ['LL"£ 0 £ I 0 6gi '0 9gI'O gL£ g 68['g 6g§' [ 6~'<) ;g 'g I: g [ ' t' L~'g §LI 0 [9E 'g 6 o;: o OL~ g (!~'l'IHdu ~0'0 C:,"l' agd LLE'E ¢~¢~q' iHdq 000'0 (;{,v.q ' POHa LqE'g q;:q'lHdO 090'0 Oa:'t'90H8 gL['g · ':]~q' IHdO 000' 0 oi!q' }igd (! ~: q ' I H d 0 9 i 0 ' 0 Otaq' 89d (] r~ q ' I H d (] 00 0 ' 0 <,i v,q ' q'q 2)~'] <~ i ,') ' C C~ ','f ' _4Hcj lis Tame Yerit!catien ~hlumberqer Alaska Con'~putiDc Ce~tor 31 -~AR,-tg~2 !0:55 0. O13 OpH!. LWO .3 , 396 P 8 R , L ~,! "'~ LWD O.03z, DPH!. 3.208 () · ! 37 D P t~i I, L !^i D 3,3 07 P S R, iL, ~,,~ O 0,206 2.3~ 1 R;~P6, L!~'D 0 092 r') P'5 I , ...... "t I 3.316 2..353 0.180 ,3,329 2.411 0.1.45 3,769 2 434 3.469 2.435 0 130 3: 309 2 445 3.660 2.502 0 ()S9 3:696 2.4no O. 1.03 3.q07 2.391 O. J. 57 3.520 2.412 0.144 3.731 2.40g 0.1.46 ~,252 3.564 D R ~ O. I, w D D P 0 R. L ~ D ROPE. LWO DRHO.L~D ROpE,L~'D DF:BO bXD RO.PE.LWD [)RIiO b~O D P O ~, L w [) DR~IO,LWD DPUR.L~D ROPE.L!flD i) R pi O. L W D DP(3R. LWD 3 R t:i n L, i.,.: r) R[]PE. I.,aD D P [) R. b a D RQPE. L~,'D P P O ~. L .X D -O.o2s 0,180 282.456 '0,009 0,!45 74,584 ,000 ,131 41.5'909 007 O, 0,130 366,766 -0. O01 0,1.24 390, 0.04~ 0,089 291,524 OO, 27 0.103 220.229 -0.002 0.157 440,048 -0o010 O.14q 360.000 '0,006 0,!46 353.165 153.840 tS *a~,~ Yerif~cat;Ir~n Llst:i.r',o ,,,:b! u:vber<:er ~.la,sK~ Cor, r~utinr~ Cet~ter 3t-~.R.,.1992 !0:55 O. 176 O.b2I. LWD 3,793 P $ i:{ ' :b W 0 3. ,!, l 0 P $ !'~. L :~ :) 0.009 D P H !. L, !,,0 L) 2. ,'3 0 6 R i'::O 6, :[., ¢~ () 3,1 ,! 6 P 8 R. b w D 0,015 DPH I, 3,203 3.1.54 PSR.LWO 0.0 (.., 0 D P H 1. [j w [) 3.12 l PS/),. L~i:) 0.35 0 3.212 2.2 t, 4 k r.,.' f)~';, b ¢.: b -qgq, 250 PS~. bW:) 2. 346 0.184 3.226 2 . '406 . _53 2,313 0.204 3.260 2.293 0,216 3.383 2.305 0 208 31036 2,298 0.213 3.094 2 . 306 3,158 2.3OO 0.212 3.1 ]2 324 1.9'1 2.5~8 ! .759 0. 540 3.053 2.26_4. O. 234 -990. 250 DPOR. I.,: :~ D O R H 0 . L w D O P ti:) R . L ~ D ROPE. LWD D R H O. b w D D P O R,. L ROPK '_ .~ ~, ~. · :D P ()~. [,, w P :R 0 P f.';, L X D JO R H C). L w p D P 0 P. L ~,~i D f) R H O, L ¢! D ROPE. LWD DPOR, L,~D R()PE,LWD [.:) P 0 R. L ~a D 0 R H C'. L ~ P b P [? R, L ~- ? .ii'.) R x O. T.~ '?J [) D P ~3 R. L W D PODE.L~,D 0 P iiO. I.., W D DP~'~P, Lwl) PAGE1 -0.024 0,1@4 201.782 '0,021 0,148 253,206 -0.015 0,204 246.059 -0.020 0.216 317,25~ -0.009 O.208 275.306 -0,022 0 213 123:291 -0.00~ 0.208 346.694 -0.009 0.212 203.998 -0.013 0,.1..97 432,039 -(). 0 !. t) 0 . 546 233.051 0,234 -999.250 IS ~¥ac~e Verification List!.r~ ~hlum>erF.,~? ~lasK~ Comput.i..nc~ Ce~ter PAGE 1 0 -999.250 -999o250 -999,25~ * ALASKA CO~!PUTING CENTER , ****************************** ~------- ~CHLUMOERGER ~mmmmmmmmm~--mmmmmmmmmmm~mmmmm) ****************************** COMPANY NAME : ARCO ALASKA, INC. WELL NAME : 3R - 10 FIELD NAM~ : K~PARUK RIVER BOROUGH : MORTM SbOPE STATE : ALASKA AP! NUMBER : 50-029-22253-00 RECEIVED MAR Z 4 1992 Alaska Oil & Gas Cons. Oommission Anchorage Tape Verlf].cat~on Listing ~-hlumberger AlasKa Computing Center 18-~AR-1992 0~:09 ORIGIN : FLtC REEL NAME : 92184 CO~TI~UAT!©~ # : PREVIOUS REEL : CO~EN'r : ARCO ALASKA, ISC.,KUPARUK ~IVER,3~- 10,50-029-22253-00 · *** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 92/0~/1.8 ORIGIN : FLIC TAPE NA~E : 92184 CONTINUATION ~ : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC.,KUPARUK RZVER,~ - 10,50-029-22253-00 PAGE~ **** FILE HEADER **** FILE NAME : EDIT ,001 SERVICE : FblC V~SION : O01A07 DATE : MAX REC SIZE : ~024 FILE TYPE : LO L~ST FILE : ** SCHLUMBERGER WELL SERVICES ** ** ** ******************************************************************************* COMPANY NA~E: ARCO ALASKA, INC. {ELL: 3~ - I0 FIELD: KdPARUK RIVER ~OROUGH: NORTH SLOPE STATE: ALASKA AP1 ~U~BER: 50-029-22253-00 LOCATION: !7lb' FNL & 2350' FWL SECTION: g TOWNS~ilP: 13N RANGE: 9E PERMANENT DATUM: NSL LOG MEASURED FROM RKB 5~ ELEVATION: 0 ABOVE pERMANENT DATUM £S Ta~e Verification Listing ~blumberoer ~hlasF~a Co~putIn~ Center 18-~AR-t. 992 08:09 PAGE~ ELEVATIONS TD DRIbLER: KB: 52 DF: 52 GL: 11 14-MAR-~g92 4810 4809 16" ~ DRILLER DEPTH OF 122 AND LOGGER DEPTN OF 121 BIT SIZE 1: 12.25 TYPE FLUID IN HOLE: SPUD MUD DEN&ITY: 9,2 PH: 8.5 VISCOSITY: 45 FLUID LOSS: 14 MUD RESISTIVITY: FILTRATE RESISTIVITY: MUD CAKE RESISTIVITY: 3.64 ~ 65 5,07 0 65 3,6~ ~ 65 TIME CIRC~3LATION ENDf~[.: 03:00 TIME LOGGER ON BOTTOi~: 08:14 MAXI~U~ TE~P RECORDE~: 72 LOGGING DISTRICT: LOGGING ENGINEER: ~ITNESS: 3-15 PR~JDHOE BAY T. WEST SHULTZ / PETRAS~ TOOL NURSERS: AMS AA 774 TCC B 42i SGC SA 404 SLC U~ 136 SLS ~A 2001 NSC 7.39 ORS 4969 FIELD RE,ARKS: TOOL STRING (BOT-TOP): CALIPFR (LDT)-BHCS-GR-TCC-A~S. RAN 1 5" RUB~E~ STANDOFFS ON THE SONIC AND ROLLOV~R SbEEVES RA~ I 4" TEFLO~ STAN[O~F ON T~E AMS. RA~ LONG AR~ LOT wHIC~ HAS A ~AX OP~hING ~F 32" NOTE; THE SONIC IS ~ESENTED ON A NON-STANDA~D SCALE FOR EASIE~ PRESENTATION. DATE JOB STARTED: 18-~AR-92 jOB REFERENCE NO: 92~84 LDP/ANA: S. DE~S IS Tape Verificatlon Listing ~hlumDerger AlasKa Computing Center 18-MAR-1992 08:09 KUPARUK RIVE;{ 3R - I0 50-O29-22253-00 MAIM PASS bOG DATA I$ FROM FIELD FILE .005 DATA SAMPLED EVERY -.5000 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NAME BHC .BHC BORE~OLE C~MPENSATED SONIC TABLE TYPE : CONS TU~I V~LO DEFI RCO ALASK INC. Com~ang ~ame KUP.ARUK RIVkR ' FN APIN FI, SECT COUN STAT NAT! LAT! LONG SON PDA~ EPD L~~ APb E~B ED~ IDb TDL BLI ?g.I DFT DFD DFPN DFV DFL FT MT FT MT FT FT FT FT FT G/C3 S 3R - iO 50'029'2225]-00 1716' FNL & 2350' FWL 9 9E NORTH SLOPE ALASKA USA SMULTZ / PETRASH 548254 MSb 52, 52, 4810. 4809. 4804, 121, SPUD ~UD 9,200001 8,5 45, 14, Field Name Well Name API Serial Number Field Location Section Township Range Count~ State or Province Nation Latitude Longitude Witness Name Service order Number Permanent datum Elevation of Per~anent Datum Log ~easured From Above Permanent Datum Elevation of Kelly 6ushinc Elevation of Derrick Floor Elevation o~ Ground Level Total Dept~ - Driller Total De~th - Logger Bottom boq Interval Top bog Interval Dri!lin~ Fluid Type Drilling Flui~ Oensit¥ Drilling Fluid Ph Oriilin6 Fluid ~scosit¥ Drillim~ Flui~ boss TS Tahoe veriiication Listinq .-hlumbergerAlasKa Computinq Center 18-MA~-1992 08:09 PAGE: 4 TUNI YALU DEFI mm.mmm.mmmmm~m · . R~FS 0:~: 5~77000! MFST DEGF R~CS 0~:~ 3,63 ~iCST [.E. GF 65, TCS 03:00 3-15 TLA~ OS:14 STEY DEGF -999,25 BHT DEGF Resistivity of Mud Sample Mud Sample Tem:perature ResistiVity of Mud F~ltrate Mud Filtrate SamPle Temperatu Resistivity of ~ud CaKe 6amD1 ~ud Ca~e Sample Temperature Time Circulation Sto~ped TIgE LOGGE~ 0~i :BOTTO Surlace Temperature Bottom No.le Temperature TABLE TYPE : CURV DEFI DEPT Depth DT DELT~-T TTi T~ANSIT TIME ! TT2 TRANSIT TIME 2 TT3 TRANSIT TIME 3 TT4 TRANSIT TIME 4 G~ Gamma Ray CAS? Caliper TENS Tension MTEM Mud Temperature ~RES MUD ResistiVity MTE~ Head Tension ** DA%:A FORMAT SPECIFICATION RECUR{? ** -[ ........ :[ ........... . ...... YPE PR CODE VALUE ~ ~m mms ~m ~ mm ~m ~ mm mm ~mm mm m~ mm ~ ~m ~m mm ~ ~ mm ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 66 0 2 66 0 3 73 48 4 66 i 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 2i 1~ 6~ 13 66 0 14 65 VT Tape Verification Listing ;hlumberger AlasKa Computing Center 18-MAR-i 992 08:09 DEPT FT 5~8~ DT BHC U$/F 54~254 TT1 B~C OS 548254 TT2 BHC ~$ 548254 TT3 BHC US 548254 T?4 BHC US 548254 G~ B~C GAPI 548254 CALI BBC IN 548254 TENS BHC LB 548254 ~TE~ B~C DEGF 548254 ~RES BBC OHM~ 548254 HTEN BHC LB 548254 ~,~ ..... TYPE C}{A~ ** RV UNIT SERVICE AP1 AP1 APl D ORDER ~ LOG TYPE CLASS 54 00 OD NUNB O0 000 O0 0 O0 000 O0 0 O0 000 O0 0 1. O0 000 O0 0 1 O0 000 On 0 1 O0 000 O0 0 O0 000 O0 0 1 O0 000 O0 0 I O0 000 O0 O O0 000 O0 0 1 O0 000 O0 0 i mmmmmmmmmmmmmmm#mmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmm CODE ( HEX ) 68 00000 000 1 ! 4 68 0000000000 I I 4 68 0000000000 1 1 4 68 0000000000 1 1 4 68 0000000000 i 1 4 68 0000000000 I i 4 68 0O00000000 1 i 4 68 0000000000 i 1 4 6~ 0000000000 1 I 4 68 0000000000 1 1. 4 68 0000000000 i I 4 68 0000000000 DATA I)~T, 482~ 500 DT BHC a.~HC ~6. :500 T~4:~C TENS. BHC 1660.000 MTE~. BHC 102.938 459,000 71.625 DEPT. 4800.000 DT BBC 102 938 - TT3. BHC 667,500 TT4,' BbC 459: ~[ENS, BHC 4.380,000 ~4TE?-!, BBC 71.625 DEPT. 4700.000 D'r.gHC 114,813 TT3.BaC 709.000 TT4.BaC 479,500 T~NS.BHC 4150.000 ~4T~H.BMC 71.625 DEPT. 4600,000 DT.BMC 112.563 TI:3,BHC 700.000 TT4.BBC 476.000 T~NS.BhC 41!5.000 MTE~i,BNC 71.503 DKPT. 4500.006 DT.B~C 128 00O TT].BHC 771,500 TT4.~HC 520:000 T ~S B~C 3910 OOO ~,~TEt< BHC 71 3)5 D8iPT 4400.0OO DT.~BC ! 11 438 T~I'3:SHC 722.500 TT4.BHC 489:5o0 TEe-IS. B~C 4020,000 HTEM,B'~C 71,125 TT1,BHC 623 500 TT2.BHC GR.BHC 70:938 CAbI.BHC NRES.6HC 4,176 HTEN,BMC T~'i,BHC 623.500 TT2.BMC GP.dMC 70.938 CALi.BHC M~ES,BHC 4,176 HTEN,~HC T~I,BBC 712.500 TT2.BMC GR,BHC 83.125 CALI.BHC ~RE$,BHC 4,191 HTEN,BHC TT!,BHC 702,500 TT2.BHC GR,BMC 78,125 CALI.BhC ~RES,BHC 4.227 HTEN,BHC T'I.'I,BHC 764.000 TT2.BHC GR,BHC 59.500 CALI.BMC MRES.BMC 4.320 ~iTEN.BHC TTI.BMC 724.000 TT2.B~C GR.BHC 84.375 ChbI.BaC MRES,BHC 4.289 HTEN.BNC 420 25O 12!71.1 90 938 420,250 !2,430 1165,000 485,000 13,063 997.5OO 478.750 12,906 953,000 522,000 13,008 886.500 491,000 13.186 946,000 chlUmberger alaska Computi qn. Center DEPT· 4300.000 .~n'..'~I. BHC. TT3.BMf 739.500 TT4 B~'~L";" TE~!S,BHC 4:010,()00 ~TEM~BHC lB-EAR-1992 O8:109 12~. 125 '~1 SaC 523i000 G~.BHC 70 563 ~RES,B~C 740. 000 79.938_ 4·219 783,500 62.281. 4,246 DEP,, 4.100.000 DT,BBC !~1,500 ~TI,B~iC 761,500 TT3,BHC 760,000 TT4,BBC 522,000 GR.B~C 73 125 I,;,h$ BHC 3780,000 EiTE~,~ ~3BC 70,168 ~RES,BHC 4:~ 36 DEPT. 4000 , 000 DT. BMC r3 BHC 735,000 TT4,BHC TE?!S'BHC 3805,000 ~TEH, B~C DEPT. 3900,000 DT,~C TT3.BMC 792,000 TT4,BMC TE~S,BHC 37~0,()00 MTEbi,B~C DEPT. 3700,000 DI.6 C TT3 BHC 84.6,500 TT4, BBC T~t~s.' B~C 3805 . ooo ;~,. t~: h. ~c~ ~' DEPT, 3600.000 DT.BMC TT3,BHC 818.500 TT4.BMC ' E' BHC 3695.000 ~TE~ BMC D.,+FT 3500,O00 DT f,~ta C T · 173 BHC 864.000 T,r4o BMC TENS,BHC 3640,000 .*4TEM.~HC DEPT. 3400.000 DT.BhC TT3,BHC 813.000 TT4.~HC TENS,BBC 3685,000 MTEM.BMC DEPT, 3300.000 DT.BHC TT3,BHC 802.000 TT4.B~C TEt!S.BhC 3405.000 ~TEM.BHC !17. 250 TTI.BHC 506.25:0 G~ ssc 09.250 MRES::BB'C !24,750 TTI,BHC 542,500 GR,BHC o8,938 gRES,BHC 137,875 TT1,BMC 559.500 GR.3~C 68,t88 ~RES,BHC la0.125 TT!,BMC 567,000 GR.B~C 67.563 ~RES,BHC 136.000 T~'i,BMC 548.000 GR.6HC O7.125 ~RES.BHC 146,875 TTI,BHC 582.000 GP,~MC 66.625 M~ES.8MC 132.000 TT1.BMC 543.000 GR,BHC 66.063 140.500 TT'i.SHC 568.000 GR,BOC 65.500 ~RES.BHC 128.875 T~'I.B8C 541.000 GR.BHC 04.938 qRES.BnC 141.125 TT1,BSC 502.000 64.063 MRES,BHC DEPT. 3200.000 DT.BHC TT3.BHC 801.00,3 TT4.BBC TENS.BHC 3590,000 ~TE{,!.gHC DEPT. 3100. 000 DT. d"C TT3. gBC 858. 500 T'!4.BhC TFNS. BHC' 3640. OO0 ~TETM BHC 738,500 0 ! 25 794,000 74,000 4,:488 826 000 63:406 4,715 846 000 28:84-4 4.793 818 50O 39i406 4 730 867.500 35.125 4.781 816.000 48.625 4.770 836.000 43.906 4.852 798.500 50.844 4.738 855.500 74.063 4.801 TT2,BHC TT2.BhC CALl,BBC MTEN,BMC TT2.BHC CabI.SHC HTEN'BHC TT2 FBMC CaLl; MC ~?g~' gac TT2, BHC CA LI.' BMC HTEN i BHC ~ t7 ,BHC CALI BHC HTE:~:BHC TT2,BHC CALI,BMC 8TEN,BHC TT2.BMC CALl.BBC '~ BHC H~.~N, T'F2, BHC CADI,BhC HTEN, BHC TT2.B~C CALI.BHC HTEN.BHC TT2,B~C CALI,BHC HTEN.B~C TT2.SmC CAL!.BHC HTEN.BHC TT2.BMC CALI,BHC HTEN.BMC PAGE: 503,000 12,922 947.500 523,500 12.875 908'500 524,500 13.375 954,000 508.250 13 648 960:.000 543 500 13 367 955 5OO 565.000 13.367 982,500 0,500 513.313 945.500 550,500 13,133 940.000 583.500 13.234 973,500 546.000 13.133 1062.000 573.000 13 133 927:500 540.000 13,156 1078.000 565.500 13 234 !022~000 lis T'a~e Verification Listinq chlumberger Alaska Computin~ Center DEPT. 2900.000 DT.BHC TT3'BHC 863,500 TT4.6hC TENS,B~C 3660,000 ~TEM,BHC D~PT, 2800.000 DT.BMC ~T3.BMC 828,000 TT4,BBC TENS,BHC 3480,000 ~TEM.B. HC D''~ BHC DEPT. 2700.000 itl, TT3,BHC 905'000 T 4,BHC TENS,BEC 3225'000 ~TEM,BBC D..PT. 2600 000 DT,BHC TT3,BHC 856:000 TT4,BHC TE:~,S.BHC 3455.000 MTEM'BBC DEPT 2500,000 DT.BHC TT3:BHC '980,000 TT4'B~C I~,~s. ~c 3060.000 ~:~. ~sc DEPT 2400,000 DT,BHC TT3'BHC. 875,500 TT4,BMC *~'~8~, ~, ,;.~ , BBC 31.30.000 ,.~q.BHC., ~ .~ DEPT 2300 000 TT3.'BHC 895:500 TT4.BHC TP,:~,~S.~C ~aO.O00 DEPT, 2200.000 DT BHC 7~'3.BHC 968,000 F'~'4.BHC TE~S.BHC 29!0,000 ~TE~.BHC DEPT. 2100,000 DT. BHC TT3. BHC 910. 000 TT4,BHC TENS.BBC 2810,000 ~TEM.SHC DEPT. 2000,000 DT,BHC TT3.BHC 926.000 TT4,BHC TENS.BHC 2875.000 MTEM,BHC DKPT 1900 000 DT.BHC TT3~BHC 940;0~0 TT4.BHC TE~:~S.BHC 3000,000 ~TE~,BHC DEPT ~00,000 DT BHC TT3~HC 1.013.000 TT4."~C T~NS.UHC 2750.000 !8-MAR-1992 08109 104,625 TTi.BHC . . . ~ . . ~ 85 50:0 GR,B~,C ' 8HC 63.344 ~R:ES, 143.625 TTI:.g~C 569,000 GR.MHC 62.844 MRES.BHC 1~.8.750 TT! ,8HC 5 . 9' 500 62,406 .~ R E S, S H C 149.!25 T !.BMC 600'000 Ga'~ H S C 61.438 MRES,LHC 141.125 TTI,BBC 573.505 GR,~HC 60.625 MRE$,BHC 71!625 TTI BHC 13 000 GR:BBC 659 938 t~ES.BHC 14:7 625 TT1.BHC 502: 000 C~. t~hC 59,500 ~RES,:B~C 250 TT1 ~'C ~o215oo ' G~:~C lb6 875 T!rl, 6HC 6~:5oo c~..~c 5~.25o M~S.~C 165.750 TTI.BHC 598.0¢0 GR.gHC 57,031 ~RES.BHC g:ooo 60 500 GR.BHC 55.938 MRES,BHC 160,750 T'rl,g~C 620.O00 GR,BHC 54.438 MRE$,BHC 170.625 TTi,BMC 671.000 GR,SMC 51.594 MRES,BhC 729. 000 42' 500 4'809 861.000 48.438 4.922 832.:000 54.656 4.910 902:500 5 :soo 5. :o o 4 850.500 69.:000 5.074 980 000 ' 51: 6 56 5,113 878500 66!438 5 160 897 000 5,277 971,500 43.625 5.316 926.500 65.563 5.391 926.500 69.813 5.504 942.o00 47,938 5,'762 000 oo 5.969 TT2.BHC CALI'BHC ~T:EM.BMC '2 Tr:,BHC CALI.BMC HTEN,BMC TT2,BHC CAbI,BMC HTEN,BHC TT2-BMC CAhI'BHC HTEN,BMC TT~,OBC ChLI,BHC HTEN.BhC TT2.BHC CALi.BHC HTEN.BHC TI2 BHC CALl:SaC HTEN.B~C TT2,BHC CALI..BHC HTEN.BHC T~:2,BHC CAbI.BMC HTEN.BHC TT2.BHC CALI.BHC HTEN,BdC TT2.ShC CALI.B~C HTEN,BHC TT2.BhC CALI.BMC tlTEN,B~C TT2.BHC CALI.B~C HTEN.BHC P A G E: 490,750 1.4,820 I178.:000 574,000 12,6 72 ! 226. 000 563,000 12.617 1165.000 600.000 13'203 1119,000 5~0 500 2:453 !243,000 10:10. 500 58' 00O !18 000 606,000 13,133 1115,000 639.500 13.469 1125.000 605.500 12.672 1064.000 612.000 12.906 1154,000 623.500 12.672 1162,000 675.000 13,828 1191,000 IS Tape Verification Listing chlumberger Alaska Computing Center D~P'T 1700.00o TT3:BH¢ 83o.5oo TLNS. BHC 2965,000 DT.BHC TT4:BHC ~TE~.BHC 4.3HC DT.BHC TT4.BHC MTE~.BHC ~4'BHC MTEH.BHC DT.BHC TT4°BHC ~TEM,BHC DT BMC YT4:BHC MTEM.BHC DT,BHC TT4.BHC ~TEH.BHC DT.BHC TT4.BHC ~TEH.BHC DT.BHC TT4.BHC DT.BHC TT4.BHC MTEM.BHC OT.BHC TI4.BHC ~TEN.BHC DT.BHC TI4.BHC MTE~.BHC DT 8HC T~:BHC MTE~.BHC D~PT, 160~ 006 r T 3. B H C 66~ ~ 000 TENS'BHC 3135,000 DEpT. t500.000 TT3,BMC 762,000 TERS.BHC 2740.000 DEPT 1400 000 r3.'BHC 914:000 T '~' BHC 2430.000 D~PT, 1300.000 'T3.BHC S70.500 T~!S.BHC 2455.000 DE.lC 1 0 0 ,, i:soo TENS.BH'C 2205,000 D~PT 1100 IT~:BHC 94a.'500 TE,8 BBC 2190 000 DEPT. 1OOO.000 TT].~HC 912.000 TENS.BHC 2120.060 DEPT. 900.000 TT3.BHC 994.000 TE~J$.BHC 1950.000 DEPT. 800.000 TT3.BHC 956.000 TEN$.BHC 1925.000 DEPT. 700.000 TT3.BHC 998.000 TF{~S.BHC 1815.000 DEPT. 600 000 ?T3.BHC 880:000 TENS.BHC 1790.000 DEPT. 500.000 TT3.BHC 945.000 TFNS.BHC 1740.000 !8-~AR-199.2 08:09 94,000 TTt, 641'000 GR'BHC 49.969 82,750 5!I,000 G~,6HC 46,909 MRES,BHC 85,500 q' T 588,0 O 0 G 47,094 MRES'BHC ! 15,375 T~ 1,8 h C 691 ~500 GR, BHC 48'531 MREM,OHC 65~.625 ~I.OHC 48.094 ~RES.S~C ~54.625 TTI.BMC 636' 000 GR' BHC 48,969 ~4RES.BHC 139,000 TT1,BHC 677,000 GR. 48,781 MRES,BHC 119.$75 TT1,BMC 679.500 GR,BHC 48.469 MRES. 8HC 173.250 TT1 .~HC 652.000 Gk.8HC 49.563 M~ES.SHC ~39.625 TTI.8HC 691. 000 GR. 48.781 MRES.SHC ~66 ~25 TT1.BHC 656:000 51.406 MRES,SHC ~04 375 TTI.~MC 645:000 GR.BHC 51.750 MRES.BMC ~17.500 TTI.BHC 693.500 GR.BHC 50.7~9 MRES.~HC 602 O0 6.258 76~.000 4~.000 9!6 0 5'9~8 871,500 54.031 5.891 969,000 .69.125 5.832 94].500 917,o00 67.688 5.785 100100o 5.629 961.000 50.188 5.656 1003.000 63.~50 5.449 884.000 37.6~5 5.480 95~.000 41.500 5.52~ TT2.BHC MTEN.BHC TT2,BaC CAbiI..,BhC HTEN,BHC TT2.BHC CAbI,BHC HTEN.BHC TT2.BMC CALI'BMC HTEN,BMC TT2.B~C CAhI'BMC HTEN,BHC TT2.BHC CALI.BMC HTEN.BMC TT2 BH'C HTEN,BHC TT2.BHC CALI.BHC HTEN,BHC TT2.BBC CALI.BHC HTEN.BbC TT2.0HC CALI.BmC HTEN.BHC TT2 BHC CALI:BhC HTEN.BHC TT2.B~C CALi.SHC HTEN.BHC TT2.BHC CALI.B~C HTEN.BHC 644,'500 i6,563 I313,000 514.500 31'875 1463,000 589.00'0 ~8i422 1278,000 i'ooo 1.175"000 660,000 14,t25 1233,000 649.500 15.!.56 I142'000 ,000 1132,000 682 000 16!141 1134 000 658.000 15.469 1126.000 694.000 17.641 1129,000 663,000 18.156 1109,000 659.500 20.219 1124.000 703.000 16.563 1092.000 Tape Ver'i. fica'tlon Listing chl6. mberger AlasKa ComDtlting Center DEPT. 400.000 T'T'3.Bit¢ 880,000 TE:~gS.BH¢ !670.000 DT.B~C TT4'BHC MTEM,BMC DT.BHC TT4°BHC ~TEM,BHC DT.SHC TT4*BHC MTEM,SHC DT.BHC TT4'~MC MTEM,BHC DEPT.. 300 '~00 TT3'BHC 932 :vO0 TENS. BHC 1535,000 DEPT. 1600 000 T~:,~. ~.~c . ~: oo0 TENS, BMC ! 385,000 DEPT. 98,500 TT3'B~C 602,000 TENS.BBC 1340,000 ** END OF DATA ** IS.-iMhR-1992 08:09 AO$ 125 TTi,BMC 7 ]500 GR,BHC 50.375 ~RES,SHC 12~,,125 TT1.BBC 65 .500 47,406 ~RES,BHC 8 ,500 48'344 ~RES,8~C 9~,688 TT!,BHC 40 .000 52,219 ~RES,O~C 875.500 TT2.BMC 26.797 CAbIiBMC 5.551 HTEN,BHC 931.500 TT2.B~C 59.625 CAbI.BHC 5.875 HTEN,B~C 863.500 TT2.BHC 29,672 CALI.BMC 5.953 HTEN.BMC 602.00:0 T T 2 . B ~ C 2:t.313 CAhI,BHC 5.629 ~ J. ~TE~. B~C PAGE 672.000 19,438 1117.000 1.500 6~9,:297 10:90,000 67:0,500 1.7~031 !139,:000 106:2,000 **** F!LE TRAIbE~ **** FILE NA~E : EDIT ,0:01 SERVICE : FLIC VERSIO~ : 00!A07 DATE : 92/03/18 ~AX REC SIZE : ~024 FILE TYPE : LO ~AST FILE **** 'rAPE TRAILER **** SERVICE NA~E : EDIT D~TE : 92/03/18 ORIGIN : FblC TAPE NA~E : 92184 CONTINUATION , : 1 PREVIOUS TAPE : CO~'ENT : ARCO ALASKA, INC.,~UPARUK RIVER,3R - ~0,50-0~9-2~253-00 **** REEL TRAILER **** SERVICE NA~E : EDIT DATE : 92/0]/18 ORIGIN : F5IC ~EEL N~E : 92184 COa~'!NUATION # : PPEVIOUS REEL CO~EN'r : ARCO ALASKA, INC.,KUPARUK RIVER,~ - 10,50-029-22255-00