Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout1991 Endicott Oil PoolBP EXPLORATION
March 23, 1992
Dave Johnston, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
RE: Year End 1991 Endicott Oil Pool - Waterflood Surveillance Report
Dear Mr. Johnston:
Attached is the annual Endicott Waterflood Surveillance Report. This report
covers the status of the Phase 1 and the 36/3C subzones waterflood program
from the initiation of injection in February 1988 through December 1991. In
addition, field surveillance and material balance information is provided from
field start-up in October 1987 through December 1991.
BP Exploration recommends a briefing in April 1992 to illustrate the present
status and future waterflood plans. Please advise Mr. Ron Shook at 564-4832
concerning a convenient time for the meeting and if there are any other
questions.
rely,
B. J. Pollcky "
Manager, Reservior Engineering
TNT/JLH/Ims
cc: Working Interest Owners
RECEIVED
MAR 2 7 1992
Alaska Oil & Gas Cons. Commission
Anchorage
mss/
a6eaopuv
uolsslwwoo suoO seg 1p 1101'A`-e1t+
Z66I L "L adb
GIARDIA
Endicott Field
pCGCC Meeting • April 27, 1992
Endicott FValtl Waterflood Performance
7:S0 . 2:15 Pm
• Project Status
. injection Performanoe
• Reservoir Woterflood Performance
• Future Plana
Endicott Safety Flare Limit 2:15 • 2:45 Pm
• Sgokground
• Flare Limit RequeSt • basis
-1 r, •.1 I IaF4" 1 1 I:- T f`r !J 1 :11.1. .111 . 1! III - I r • _.• , v.- i -s �� ,u
ENDIC
WATERFLOOD S f `
DEC'
,L,�./3-�'-+,..a.c l �rt.P.-eta .�_•-f��
This report covers the period from tl 9,
1988 through December 31, 1991 f rt
period, water injection occurred in - __ _ _ _ _ , An
eighteenth injection well was drilled in 1991, but not placed on injection until
1992. Exhibit 1 shows a map of the field with the year-end well status including
the existing water injectors, gas injectors and oil producers.
Cumulative Endicott production since start-up is 157.1 MMSTB of oil, 186.4
BSCF of gas, and 37.7 MMB of water. Cumulative water injection into Endicott
through December 1991 is 101.5 MMB sea water and 33.4 MMB produced
water for a total of 134.9 MMB as detailed in Exhibit 2. The cumulative injected
and produced reservoir volumes since start-up are shown in Exhibit 3. As of
December 31, 1991, reservoir voidage had exceeded gas and water injection
by 60.34 MMRB.
Injection Well Performance
An overview of waterflood performance is shown in Exhibit 4. Total injection
volumes, the target injection rates, injectivity index and well start-up dates
through December 31, 1991 are shown. Exhibit 5 provides graphs of the
injection rates, injectivity index, and wellhead pressure versus time for the
seventeen water injection wells. Below is a detailed activity summary for
several injection wells.
Well 1-37/P-24 was converted back from Zone 3A production to Zone 2B
injection during October, 1991 and placed on injection November 2, 1991. This
well will remain on injection until breakup in 1992. After that, it will revert to 3A
production and stay in that service until 2B gas injection no longer is able to
maintain reservoir pressure. This is estimated to occur in four to eight years.
During November, 1991, tracer was injected into six injection wells.
Radioactive tracer was injected into wells 1-69N-19, 4-04/T-26 and 4-48/K-43.
Chemical tracers were injected into wells 1-43/P-26, 2-14/P-14 and 2-44/R-12.
A rig workover was performed in March, 1991, on well 2-44/R-12 to repair
mechanical problems. At that time, the well was recompleted to eliminate a
"thief" interval in the bottom of the well. Unfortunately, during the perforation
operations, the pert guns were sanded in the well covering most ofh D
MAR 2 7 1992
Alaska Oil & Gas Cons. Commission
Anchorage
perforated interval. The well is able to inject up to 10 MBWPD, but it is
impossible to survey the well to determine zonal injection split.
Due to the problems with well 2-44/R-12, another injection well, 2-54/0-12 was
drilled in late 1991 for injection into the 3A sub -zone. This well was placed on
injection in January, 1992.
Well 2-64/1-1-10 was hydraulically fractured in December, 1991, to increase
injectivity. A post fracture survey indicates that the liner lap is leaking. The well
is shut-in and repair options are currently under evaluation.
Water Injection Performance
Pressure surveys taken as part of the reservoir surveillance program continue to
verify the restricted pressure communication across the mid -field fault system.
The observed pressures in the SDI region continue to be lower than those
observed in the MPI region. Implementation of water injection in the SDI area
has mitigated the pressure decline in subzones 2A, 2B and 3A. Refer to Exhibit
6 for the bottomhole pressure data and voidage plots since field start-up.
Commincled Water Iniection
To maximize sea water injection during winter months, commingled water
injection started in October 1990. We have been able to continue commingled
injection with no scale or operation problems.
Future Waterflood Plans
There are eighteen water injectors in the field with injection capacity over 200
MBWPD. These wells brought to completion the Phase I injection program for
the Endicott Field.
We plan on drilling two additional injection wells in the 3B/3C subzones in the
SDI, later this year. These wells will improve the sweep as well as increase our
capacity to match voidage in those sub -zones. The waterflood surveillance
program will be used to evaluate the reservoir performance and determine the
need for additional Phase II waterflood development wells.
EXHIBIT 1
ENDICOTT FIELD
' TIGVARIAK FAULT%s
312 339 3�9 '
2 -OB 1-09 J-19 !,;� 2a6.5 1-21 317 - J-39 0 i'
J-18 . c�' !?�� K-25 3-33
K-16 � �'pp.F r J'30 3-15 K-37 4-50 t w'
2-18 \ _ 3-09 '' -2 K-33 -21
i i 4 L-16 �. 48 3-25 3-11 J- L-34 3-95
230 2- 2-20 2-04,<, M 27 M-30 3 27 L-36 9 10
i' 0-09 -14 L•15 M-19 'py-25 1-29
M-25 _ 3-01 M-33 4-20
2-36 2-14 2LLi-22 ,•�- -- M-35 -46
0-16 \ RB 3-23 4-26 N-39
�\ 1-35 N-37
q 1-39 1-27 �. 1-41 t 0-25 4-0 3-29 N-32 -1
F-219 P-20 0-23 2 P-2 0-29 O-3
2-42
4-06 i; 4-42
t ` 0-17 P-21 ;�' 1-45 pg 0-32 P-38
_ 2-46 1-47 0-26 3-47
0-15 0-211-57 4-18 ', _ 0-35
' 2-68 ,. R•23 . JS -30
2-58 ' 2-52 S•17 \ 1-55 W
S-09 (f!; S-14 \ R-25 _ j �u
i 1-67 \ 2 i' •.
-7e .� T-20 1-63 +°
.1 W T-22 / i i. � , 6
't e ``�x' IKKELSEN BAY FAULT
17
02
i
Cretaceous disposal well not shown
MAW J. Hees
EXHIBIT 2
ENDICOTT OIL POOL
SUMMARY OF PERTINENT DATA
(as of December 31, 1991)
Water Injection Start-up: February 29, 1988
Endicott Production since Field Start -Up:
Oil (MMSTB) 157.1
Gas (BSCF) 186.4
Water (MMB) 37.7
Endicott Injection since Field Start -Up:
Gas (BSCF) 149.6
Water (MMB) 134.9`
Wells in Operation:
Oil Producers
55
Gas Injectors
3
Water Injectors
18"`
Waste Water Disposal
1 `•
Total
77
Water injection volumes do not include Cretaceous injection
Cretaceous injector not shown in Exhibit 1
Well 1-37/P-24 was used 6 months as an oil producer and 6 months
as a water injector
Produced Volumes
Oil
Free Gas
Water
Total
Injected Volumes
Gas
Water
Total
Net Voida,@e Volumes
Total
Produced Volumes
Oil
Free Gas
Water
Total
Iniected Volumes
Gas
Water
Total
Net Voidaee Volume.,
Total
Produced Volumes
Oil
Free Gas
Water
Total
Injected Volumes
Gas
Water
Total
Net Voidaee Volumes
Total
Note: Water injection volumes do not include Cretaceous injection
EXHIBIT 3
ENDICOTT
OIL POOL
RESERVOIR BALANCE FOR WATERFLOOD
SANDS
EFFECTIVE PRODUCTION SINCE FIELD
START-UP
from October 1987 through December 1991
(Values in MMRB)
MPI REGION
by SUBZONE
3�
3B
3A
2-B
2A
MPI Total
9.86
4.30
25.08
31.30
46.72
117.26
5.20
2.08
7.68
13.35
6.85
35.16
1.47
Lu
4 Q4
29
3
12.43
16.53
7.24
36.80
47.44
56.84
164.85
0.00
0.00
25.56
34.65
39.11
99.32
4.21
3,24
817
19.06
15.45
50.83
4.21
3.94
33.73
53.71
54.56
150.15
12.32
3.30
3.07
-6.10
2.28
14.70
SDI REGION
by SUBZONE
K
313
3A
2B
2A
SDI Total
18.81
6.92
14.13
38.08
15.99
93.93
4.07
2.45
0.25
1.89
1.43
10.09
2.46
1H
2.90
I1 2
7.00
24.96
25.34
10.35
17.28
51.59
24.42
128.98
0.00
0.00
0.00
0.00
0.00
0.00
13.15
3,66
15.91
31M
19.26
83.34
13.15
3.66
15.91
31.36
19.26
83.34
12.19
6.69
1.37
20.23
5.16
45.64
FIELD TOTALS by SUBZONE
K
3B
3A
213
2A
Field Total
28.67
11.22
39.21
69.38
62.71
211.19
9.27
4.53
7.93
15.24
8.28
45.25
3,91
1.84
6.944
14 41
10.27
37.39
41.87
17.59
54.08
99.03
81.26
293.83
0.00
0.00
25.56
34.65
39.11
99.32
17.36
7.60
34M
50.42
34.7E
13417
17.36
7.60
49.64
85.07
73.82
233.49
24.51
9.99
4.44
13.96
7.44
60.34
Note: Water injection volumes do not include Cretaceous injection
Note: Water injection volumes do not include Cretaceous injection
Wells had both produced and seawater injection
Dedicated produced water injectors
EXHIBIT 4
ENDICOTT OIL POOL
WATERFLOOD
PERFORMANCE OVERVIEW
Injection Well Data
(through December 31, 1991)
TARGET
INJECTIVITY CUMULATIVE
WELL
NAME
RATE
(MB Dl
INDEX INJECTION
(BPD/PSI) (MM@1)
START-UP
DATE
MPI Reservoir Area
1-37/P-24'
3.0
3 4.89
April 1988
1-69/V-19
11.0
4 2.13
November 1990
2-16/M-16'
5.0
17 9.56
March 1989
2-22/L-14'
5.0
8 4.65
May 19 1989
2-34/P-14'
3.0
6 4.27
November 1989
2-44/R-12"
8.0
4 9.38
April 1989
2-64/U-10
5.0
1 0.04
February 1991
2-70/U-15"
12.0
17 6.36
July 1989
5-02/SD-10"
4.0
6 11.72
February 1988
SDI Reservoir Area
1-43/P-26'
40.0
18 16.98
April 1989
3-07/N-28
20.0
38 12.09
April 1989
3-41/K-39
40.0
50 20.20
May 1989
3-45/M-39
10.0
12 8.25
September1988
4-02/Q-28
0
12 6.83
May 1988
4-04/T-26
18.0
18 5.84
March 1990
4-14/R-34
18.0
50 8.81
September 1989
4-48/K-43
10.0
8 2.90
December 1990
Total Injection
212.0
134.9
Seawater
148.0
101.5
Produced Water
64.0
33.4
Note: Water injection volumes do not include Cretaceous injection
Wells had both produced and seawater injection
Dedicated produced water injectors
EXHIBIT 5
ENDICOTT PHASE 1 WATER INJECTION WELLS
INJECTION RATE, WELLHEAD PRESSURE & INJECTIIVITY INDEX
VERSUS
INJECTION TIME
( START-UP THROUGH DECEMBER 31, 1991 )
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 1-37/P-24
04/10/88 -- 12/81/91
0
N
U N
0
a
m
x-
w
z
z
zm
0
0
0
0
M
� N
v
a
x
3
a=
a
0
0
0
e
M
O
� O
a n
m-
w
Qo
� o
0
� o
Z-
N
w
Q o
I
3„
w
I
N
o
Ld tD
1989
1990 1991
Q M
O
LZ
z
Zo
Sea Water (blue ///) Prod Water(preen M)l IMI 4ae red XXX Dr One (purple ear
�w
STATE REPORT
Injection Rate / Avg Whp / Inj Index
WELL 1-43/P-26
04/10/88 --12/81/91
0
m
^ o
Ln b
a
m
a
x 'P
w
Z
Z
Z �
0
CL
4y?
rl
0
a
0
M
_ O
C
d
3
Vr O
Q �
O
O
0
0
0
b
I�
a o
m a
0
wo
� Y
Q
K
Z
— o
� Q n
� 3
Q
I
o
UJ (0 1989 1990 1991
Q M
00
Z
�Qp 3ee Water (blue ///) Prod Water re en \\\) MI Gas red XXX Dry Gas (purple ###)
�w
1
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 1-69/V-19
04/10/88 -- 12/31/91
r
a
0 0
d
x
0
z
f
o
0
a
0
�o
� a
as
v
EL
x
3
N
o
i
0
0
0
0
0
N
O
0 O
an
m^
w
Qo
o
� e
2 ^
�
N
�
I
�
w
Q e
�
3N
a
I
M
o
w
1989
1990 1991
Q M
p0
Z0
1160 Water (blu lProci Wet* IMI Dee red XXX Dr Gas (purple er
� w
STATE REPORT
Injection
Rate / Avg Whp / In) Index
WELL 2-16/M-16
04/10/88 -- 12/81/91
0
e
a
O Y
a
m
X
w
0
Z o
N
z
Z
O
O
O
O
Y
O
O
� M
d
v0
d o
= o
3N
O
Q
O
O
O
O
O
O
O
M
a o
m o
o
ill J
N
Q
z
N
0)
O
o
Q o
a
3
w
1989
1990 1991
Q M
Z
�Qp
�
3ea wato JProd Water re s IMI Gas fired XXX) Dry Gas (purple *# 7#)
�w
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 2-22/L-14
04/10/88 -- 12/81/91
0
N
N
a
0
a
m
0
x -
w
O
Z
Z '^
0
L JLJ 11
0
0
0
M
r�
N O
a N
d
3
a=
0
0
0
0
0
M
O
a o
M o
0
w o
N
�
z'
N
— o
K o
wo
�
Q o
�
3
I
�
o
w
1989
1990 1991
Q M
0
O
Z
�Qp
80a Water blue /// Prod Water re IMI Ciao (red XXX) Dry Gus (purple N0-0
�w
M
W (0
Q M
Z Z
� W
STATE REPORT
Injection Rate / Avg Whp / Inj Index
WELL 2-34/13-14
04/10/88 -- 12/31/91
See Water (blue ///)I JProd Water reen \\1 MI Gas (red XXX) Dry Gfle (purple !aR)
STATE REPORT
Injection Rate ! Avg Whp ! Inj Index
WELL 2-44/R-12
04/10!88 -- 12/31/91
m
c�
o.
m
X II+�
w
? N
Z
O
O
O
O
d
O
O
�O
N
a
..a
a a
= a
3N
c�
aQ
0
0
0
0
0
0
M
O
a o
mo
wo
QN
� I l
cV w o 1 7
� o
I a
M o
UJ 1989 1990 1991
Q M
00
Z
Qo 8�6 Watef fplu� /1 lProci Water(green \\\ MI Gas red XXX) JDry Cies (purple �rR
� w
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 2-64/U-10
04/10/88 -- 12/31/91
a
0
a
m
X
Z
z
0
0
0
0
Y
O
O
O
�! M
N
.av
d o
= o
3�
O
Q
O
O
O
O
O
O
ao
mo
0
W Y
F-
a
o:
z
N
�
— o
�o
wo
I
a�
�
3
Q
I
`*
o
w LO
1989
7990 1991
M
0
72
Z
Z0
3ea Water blue JProd Water re IMI Gas red XXX Dry Gas (purple #—N
�w
m
STATE REPORT
Injection Rate / Avg Whp / Inj Index
WELL 2-70/U-15
04/10/88 --12/31/91
0
e
19tl9 1990 1991
Baa Water lblu• /I/1 Prod Waterreen \1l IMI Gas (red X JDry Qae (purple gra)
w (p
Q M
=0
Z Z
Zp
�w
0
STATE REPORT
Injection Rate / Avg Whp
WELL 3-07/N-28
04/10/88 -- 12/81/91
/ Inj Index
189s Water blue /// Prod Water(green \\\1 IMI Gee (red XXX) Dry Gas (purple taa)
INJECTION RATE / WHIP /
PRESS GRAD / INJ INDEX
WELL 3-41/K-39
O
04/10/88 -- 12/31/81
a
0
O p
CL
m
I
x
W
0 p
Z h
z
Z
0_Aj
II
m
O
n
H
� m
a
op
I
ap
w N
� O
O
O
O
O
M
� O
a o
VN
a
x
30
a
o
e
0
0
°e
a
m+
W
4e
mo
N
O1
s'
I
<
<
c
o
3oe
y
I
I
�
o
W cD
1989 1990 1991
Q M
p0
Z
ZQp
Sea Water blue "/ Prod Water (green 1\11 MI Gee (red XX� Dry Gas (purple #fP#)
�w
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 3-45/M-39
04/10/88 -- 12/81/91
N
0 O
d
m
X
w
z
Z y�
z
Z
0
0
0
0
m
�o
0
N o
a Y
a
2
3
� o
0
> o
Q n
O
0
0
o�
0
n
0
ao
m a
0
wo
Q�
a:
zz
— o
I
a'
�
3
1
�
o
UJ iD
1989
1990 1991
Q M
O
p
Z
3ea Water blue /// Prod Water reen \1\ MI Gas (red XXX) Dry Qae (purple Mar
MZ0
C
STATE REPORT
Injection
Rate / Avg Whp / Inj Index
WELL 4-02/Q-28
04/10/88 -- 12/81/91
0
v
^o
aM
c
CL
m
m
x �
W
z
Z
O
Z
O
O
O
O
O
O
�O
�_ MI
aai
d o
= a
3"
>
O
Q O
O
O
O
O
O
O
n
O
n. o
mo
0
Wo
�
Q
0:
Z_
N
o
� o
W O
01
< 0
tr
3
Q
I
�t
o
w co
1989
1990 1991
Q M
00
Z0
8es Water blue /// Prod Waterroan \\1 MI Gas (red XXX Dry Gas (purple fpt)
�w
STATE REPORT
Injection
Rate / Avg Whp I Inj Index
WELL 4-04/T-26
04/10/88 -- 12/31/91
0
m
= o
CL b
a
m
x�
w
0
z
Z N
O
O
O
O
M
�O
O
� O
d N
v
d
2
U• o
a
Q o
0
0
0
0
0
M
n
ao
mo
0
W O
r N
a
z
�
0
0
W Oa
i
�
r�
3
Q
i
I
LJ
1989
1990 1991
Q M
�z
Zo
leall Wets(• 7751 lProd Water (Breen 71 IMI G89 red XXX Dr Gas (purple tM>f
�w
STATE REPORT
Injection Rate / Avg Whp / Inj Index
WELL 4-14/R-34
04/10/88 -- 12/31/91
G
O
O
n�
d b
m
x
W
O v
2 �I
0
0
0
M
O
N O
v N
d l
O IIJIf
Q O
O
P
O
O
O
O
� O
W M
41
W
aG
0
z�
N w
s
a G
w �C 1989 1990 1991
Q M
p O
�0
less Wet• (blue lProd Water re IMI Gus red XXX Dr qee ur le aae
�w
STATE REPORT
Injection
Rate / Avg Whp ! Inj Index
WELL 4-48/K-43
04/10/88 -- 12/31/91
0
a
^ o
U) M
a
0
a
m
x�
0
z
�o
z�
0
9
G
e
O
O
O
� M
d
v o
A a
3�
I
c�
as
0
a
0
0
0
0
0
M
r�
a O
M O
O
W O
r N
Q
�
Z
Y Al
N
O
o
1
1
Q
I
V
o
W (0
1989
1996 1991
Q 0
�ae■e
■ •► b • /// Prod Water {green W) MI 4ea red XXX Dr
Qes ( ur le aea)
i�w
STATE REPORT
Injection Rate / Avg Whp / Inj Index
WELL 5-02/SD-10
04/10/88 -- 12/31/91
0
M
En
a
0
a
x
w 1
O
Z o
Z
0
0
0
0
M
� O
_ O
N N
d
CL1� lJ_
� o
o
Q
0
a
0
0
0
M
r�
ao
MQ
0
w o
r �
K
z
Z
o
N � o
� w o
0
I '
� o
w 1989 1990 1991
Q M
p O
M 0 lose Water (blue lProd Water reen 1\1 IMI Gas red XXX Dr Gas (purple —00-1fl
�w
EXHIBIT 6
ENDICOTT WATER INJECTION WELLS
BOTTOM HOLE PRESSURE REPORTS
9
BOTTOM HOLE PRESSURE AND RESERVOIR VOIDAGE PLOTS
(START-UP THROUGH DECEMBER 31,1991)
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page
Static Pressure Report.
Time
Shut-in
Hr
Test
BH
TEST DATE
Depth
Temp
PBAR
Well Name
----------
DD -MM -YY
---------
ss
--------
F
psia
1-01/J-19
05 -JUN -88
10000.00
-----
216
-------
4745.00
28 -JUN -88
10000.00
209
4709.00
19-NOV-88
10000.00
217
4618.00
12 -MAR -90
10000.00
212
4599.00
12 -AUG -90
10000.00
215
4690.00
1-05/0-20
14 -APR -88
10000.00
212
4833.00
1-09/J-18
01 -OCT -87
10000.00
204
4890.00
22-NOV-87
10000.00
0
4813.00
02 -FEB -88
10000.00
212
4788.00
10 -OCT -88
10000.00
212
4628.00
19 -MAR -90
10000.00
218
4638.00
20 -MAR -90
10000.00
218
4667.00
18 -MAY -91
10008.00
220
4924.00
18 -MAY -91
10013.00
220
4936.00
1-21/K-25
30 -APR -90
10000.00
216
4288.00
14 -JUN -90
10000.00
216
3332.00
14 -AUG -90
10000.00
214
3526.00
13 -DEC -90
10000.00
216
3924.00
14 -APR -91
10000.00
213
3915.00
14 -AUG -91
10000.00
0
3500.00
_
12 -SEP -91
10000.00
216
3905.00
1-25/N-22
30 -SEP -87
10000.00
0
4833.00
------- - -
23 -MAR -90
10000.00
216
4636.00
w=;1 -27/P-20
02 -SEP -87
10000.00
204
4890.00
29-NOV-88
10000.00
213
4669.00
- -- 1-29/M-25
02 -SEP -87
10000.00
208
4891.00
02 -FEB -88
10000.00
216
4768.00
01 -APR -88
10000.00
216
4790.00
11 -JUN -88
10000.00
220
4726.00
23 -OCT -88
10000.00
211
4644.00
21 -MAR -89
10000.00
215
4636.00
12 -AUG -90
10000.00
217
4707.00
1-35/0-25
05 -SEP -87
10000.00
211
4892.00
21 -JAN -88
10000.00
0
4809.00
25 -APR -88
10000.00
209
4758.00
12 -JUN -88
10000.00
218
4742.00
25 -OCT -88
10000.00
209
4721.00
27 -MAR -89
10000.00
214
4631.00
26 -SEP -89
10000.00
214
4571.00
28 -FEB -90
10000.00
220
4611.00
12 -AUG -90
10000.00
216
4714.00
Time
Shut-in
Hr
Report Run Date: 26 -FEB -92
User ID: EDAN036
TEST DATE
Well Name DD -MM -YY
---------- ---------
1-37/P-24
1-39/P-17
1-41/0-23
1-43/P-26
1-45/Q-26
1-47/Q-21
1-49/P-21
1-55/R-25
1-57/R-23
1-63/T-22
07 -JAN -88
15 -AUG -90
02-NOV-90
23 -AUG -88
02 -DEC -88
19 -JUN -89
20 -JUN -89
11 -AUG -90
11 -AUG -90
06 -SEP -87
08 -DEC -88
18 -FEB -90
13 -AUG -90
12-NOV-90
17 -APR -91
16 -DEC -88
24 -OCT -89
01 -JUN -91
05 -SEP -87
17 -DEC -87
03 -AUG -89
26 -FEB -90
12 -MAY -91
12-NOV-91
09 -MAY -89
01 -MAR -90
13 -AUG -90
22 -APR -91
07 -OCT -91
07 -MAY -88
06 -JUN -88
04 -SEP -88
22 -MAR -89
05 -APR -90
12 -AUG -90
07 -JUN -91
28 -DEC -88
01 -JUN -90
14 -AUG -90
08 -JUN -91
09 -JUN -89
04 -APR -90
13 -AUG -90
Page 2
Static Pressure Report
Test
Depth
ss
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.01
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
BH
Temp
F
207
170
182
213
215
216
215
212
212
205
212
214
215
212
212
213
123
207
206
213
203
207
209
210
211
213
213
208
212
203
205
0
206
206
207
209
207
209
206
209
207
205
206
Time
PBAR Shut-in
psia Hr
4801.00
4694.00
4767.00
4705.00
4609.00
4452.00
4516.00
4677.00
4704.00
4891.00
4702.00
4634.00
4721.00
4690.00
4829.00
4656.00
4578.00
4108.00
4897.00
4631.00
4410.00
4453.00
4229.00
4180.00
4440.00
4557.00
4707.00
4761.00
4898.00
4790.00
4666.00
4544.00
4322.00
4369.00
4266.00
4140.00
4439.00
4369.00
4292.00
4113.00
4311.00
4354.00
4177.00
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page
Static Pressure Report
Time
Shut-in
Hr
Test
BH
TEST DATE
Depth
Temp
PBAR
Well Name
----------
DD -MM -YY
---------
ss
--------
F
-----
psia
-------
1-63/T-22
10 -JUN -91
10000.00
208
4194.00
1-67/T-20
03 -FEB -90
10000.00
200
3549.00
12 -AUG -90
10000.00
205
4133.00
16 -AUG -90
10000.00
207
4219.00
03 -JUN -91
10000.00
208
4350.00
04 -JUN -91
10000.00
208
4285.00
1-69/V-19
04 -JUN -90
10000.00
206
4117.00
20 -SEP -91
10000.00
148
4700.00
2-04/M-19
28 -FEB -88
10000.00
215
4769.00
12 -JUN -88
10000.00
216
4751.00
03 -JAN -89
10000.00
207
4673.00
13 -JUN -89
10000.00
217
4632.00
12-NOV-90
10000.00
212
4694.00
08 -MAY -91
10000.00
214
4849.00
2-06/J-22
30 -MAR -88
10000.00
218
4849.00
2-08/K-16
07 -MAR -88
10000.00
205
4789.00
20 -OCT -88
10000.00
207
4531.00
25 -MAY -90
10000.00
213
4683.00
25 -MAY -90
10000.01
205
4656.00
23 -MAY -91
10000.00
213
4954.00
24 -MAY -91
10139.00
213
5009.00
_
18-NOV-91
10000.00
213
4657.00
18-NOV-91
10001.00
214
4725.00
- --_ 2-14/0-16
07 -SEP -87
10000.00
206
4890.00
16 -OCT -88
10000.00
214
4678.00
13 -MAY -89
10000.00
212
4613.00
14 -MAY -89
10000.00
212
4622.00
-
17 -MAR -90
10000.00
214
4627.00
18 -MAR -90
10000.00
214
4605.00
13 -SEP -91
10000.00
0
4901.00
13 -SEP -91
10002.00
0
4836.00
2-16/M-16
09 -FEB -89
10000.00
210
4626.00
11 -AUG -90
10000.00
0
4790.00
2-18/L-16
14 -SEP -90
10000.00
213
4612.00
23 -MAY -91
10000.00
218
4903.00
20-NOV-91
10000.00
213
4657.00
2-20/L-15
20-NOV-90
10000.00
208
2693.00
24 -MAY -91
10000.00
208
1776.00
2-22/L-14
11 -AUG -90
10000.00
0
4740.00
02 -OCT -91
10000.00
181
4626.00
13 -OCT -91
10000.00
183
4650.00
14 -OCT -91
10000.00
183
4647.00
2-26/N-14
29 -JUN -88
10000.00
204
4837.00
Time
Shut-in
Hr
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page
Static Pressure Report
-S+L�stl - i v 7in.t� iva�' �a.Y�i..J �iL7`ov OAfL .
Time 4
Shut-in
Hr
Test
BH
TEST DATE
Depth
Temp
PBAR
Well Name
----------
DD -MM -YY
---------
ss
--------
F
-----
psia
2-26/N-14
29-JUL-88
10000.00
207
-------
3718.00
08 -OCT -88
10000.00
209
3320.00
21 -FEB -89
10000.00
210
2894.00
27 -APR -89
10000.00
205
3286.00
07 -FEB -90
10000.00
210
4006.00
12 -AUG -90
10000.00
210
3486.00
16 -MAY -91
10000.00
213
1824.00
2-28/P-19
27 -SEP -88
10000.00
209
4695.00
07 -DEC -88
10000.00
209
4603.00
16 -AUG -89
10000.00
210
4565.00
2-34/P-14
30 -AUG -87
10000.00
206
4892.00
14 -APR -88
10000.00
202
4486.00
2-36/0-14
15-JUL-90
10000.00
208
4647.00
13 -AUG -90
10000.00
210
4710.00
02 -JUN -91
10000.00
206
4790.00
2-42/P-13
09 -FEB -89
10000.00
199
4731.00
08-NOV-90
10000.01
210
4801.00
O8-NOV-90
10000.00
210
4475.00
31-JUL-91
10118.00
215
4735.00
31-JUL-91
9266.00
210
4350.00
2-44/R-12
27 -FEB -88
10000.00
206
4802.00
28 -MAR -88
10000.00
206
4502.00
11 -SEP -88
10000.00
203
4482.00
16 -OCT -88
10000.00
0
4783.00
11 -AUG -90
10000.00
0
3693.00
16 -AUG -90
10000.00
164
4658.00
2-46/Q-15
22 -JUN -89
10000.00
208
4420.00
04 -AUG -89
10000.00
203
4427.00
22 -DEC -89
10000.00
205
4456.00
13 -AUG -90
10000.00
209
4465.00
2-52/5-14
25 -OCT -87
10000.00
202
4900.00
27 -JAN -88
10000.00
205
4784.00
03 -AUG -89
10000.00
202
4456.00
25-NOV-89
10000.00
0
4505.00
O1 -JAN -90
10000.00
207
3695.00
07 -JAN -90
10000.00
208
4218.00
13 -AUG -90
10000.00
208
4500.00
2-58/S-09
05-NOV-90
10000.00
207
4254.00
25 -MAY -91
10000.00
207
4036.00
12 -DEC -91
10000.00
207
4277.00
-S+L�stl - i v 7in.t� iva�' �a.Y�i..J �iL7`ov OAfL .
Time 4
Shut-in
Hr
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page
Static Pressure Report
Time
Shut-in
Hr
Test
BH
TEST DATE
Depth
Temp
PBAR
Well Name
DD -MM -YY
ss
F
psia
----------
2-62/--17
---------
07 -SEP -87
--------
10000.00
-----
203
-------
4894.00
05 -FEB -88
10000.00
204
4737.00
13 -JUN -88
10000.00
212
4673.00
27 -SEP -89
10000.00
208
4601.00
26 -FEB -90
10000.00
207
4642.00
02 -SEP -90
10000.00
210
4476.00
04 -SEP -90
10000.00
210
4731.00
04 -JUN -91
10000.00
216
4783.00
06 -OCT -91
10000.00
208
4872.00
2-64/U-10
05-JUL-91
10000.00
192
5991.00
2-68/S-17
22-NOV-88
10000.00
193
4507.00
28 -SEP -90
10000.00
210
4592.00
2-70/U-15
01 -MAY -89
10000.00
199
2854.00
12 -MAR -90
10000.00
124
5289.00
11 -AUG -90
10000.00
0
5013.00
20 -MAY -91
10000.00
134
5308.00
3-01/N-29
10-NOV-87
10000.00
217
4839.00
05 -DEC -87
10000.00
215
4696.00
27 -MAR -88
10000.00
218
4512.00
11 -JUN -88
10000.00
219
4497.00
21-JUL-88
10000.00
214
4495.00
22 -OCT -88
10000.00
211
4524.00
21 -AUG -89
10000.00
216
4421.00
25 -MAR -90
10000.00
215
4505.00
20 -OCT -90
10000.00
218
4427.00
27 -AUG -91
10000.00
214
4646.00
3-05/0-29
06 -DEC -87
10000.00
213
4907.00
30 -MAR -88
10000.00
211
4813.00
26 -MAY -88
10000.00
215
4460.00
23-JUL-88
10000.00
211
4498.00
11 -OCT -88
10000.00
212
4590.00
19 -AUG -89
10000.00
212
4333.00
25 -FEB -90
10000.00
210
4506.00
24 -MAY -91
10000.00
213
4872.00
3-07/N-28
11 -AUG -90
10000.00
0
4629.00
3-09/L-28
06 -APR -88
10000.00
216
4799.00
3-11/M-30
27 -SEP -88
10000.00
215
4503.00
07 -OCT -88
10000.00
214
4541.00
09-JUL-89
10000.00
217
4440.00
28 -OCT -90
10000.00
215
4379.00
28 -OCT -90
10000.01
215
4509.00
28 -MAY -91
9969.60
221
4705.00
28 -MAY -91
9975.10
221
4781.00
Time
Shut-in
Hr
Report Run
Date: 26 -FEB -92
Page 6
User ID:
EDAN036
Static Pressure
Report
Test
BH
Time
TEST DATE
Depth
Temp
PBAR
Shut-in
Well Name
DD -MM -YY
ss
F
psia
Hr
----------
3-15/--33
---------
23 -DEC -87
--------
10000.00
-----
214
-------
4836.00
-------
0
13 -JUN -88
10000.00
220
4558.00
0
17-JUL-90
10000.00
222
4534.00
0
3-17/J-30
27 -FEB -90
10000.00
218
4597.00
0
09 -OCT -90
10000.00
218
4667.00
0
3-21/L-34
04 -DEC -87
10000.00
212
4736.00
0
23 -MAR -90
10000.00
223
4441.00
0
24 -MAR -90
10000.00
223
4471.00
0
10-NOV-90
10000.00
220
4334.00
0
10-NOV-90
10000.01
220
4411.00
0
30 -JUN -91
10000.00
219
4653.00
0
30 -JUN -91
10111.00
219
4724.00
0
3-23/N-32
03 -DEC -87
10000.00
208
4828.00
0
02-NOV-88
10000.00
212
4138.00
0
14-JUL-89
10000.00
216
4327.00
0
3-25/M-27
15-JUL-91
10000.00
217
4813.00
0
23-JUL-91
10000.00
208
4894.00
0
3-27/M-33
07 -OCT -87
10000.00
213
4892.00
1
17 -APR -88
10000.00
220
4404.00
0
14 -JUN -88
10000.00
218
4440.00
1
24-JUL-88
10000.00
217
4444.00
1
07 -OCT -88
10000.00
217
4478.00
0
23 -MAY -89
10000.00
215
4373.00
0
23 -MAR -90
10000.00
217
4460.00
0
11 -JUN -91
10000.00
220
4670.00
0
3-29/J-32
23 -MAR -91
10000.00
214
4590.00
0
3-33/K-37
_
13 -SEP -87
10000.00
219
4888.00
0
09 -AUG -88
10000.00
218
4513.00
0
10 -AUG -88
10000.00
218
4469.00
0
28 -MAR -89
10000.00
220
4414.00
0
03 -APR -89
10000.00
216
4405.00
0
10-JUL-89
10000.00
219
4334.00
0
21 -OCT -90
10000.01
221
4430.00
0
21 -OCT -90
10000.00
221
4369.00
0
15 -JUN -91
10070.07
220
4773.00
0
17 -JUN -91
10000.00
221
4724.00
0
17 -OCT -91
10000.00
220
4566.00
0
19 -OCT -91
10000.00
220
4473.00
0
3-35/L-36
13 -SEP -87
10000.00
219
4890.00
0
11-JUL-88
10000.00
221
4438.00
1
09 -OCT -88
10000.00
216
4455.00
0
3-39/J-39
12-JUL-88
10000.00
224
4455.00
0
28 -MAR -89
10000.00
220
4439.00
0
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page 7
Static Pressure Report
Time
Shut-in
Hr
Test
BH
TEST DATE
Depth
Temp
PBAR
Well Name
----------
DD -MM -YY
---------
ss
--------
F
psia
3-39/J-39
10-JUL-89
10000.00
-----
223
-------
4386.00
23 -FEB -90
10000.00
221
4482.00
3-41/K-39
11 -AUG -90
10000.00
155
4513.00
3-45/M-39
23 -AUG -88
10000.00
219
4331.00
26 -MAR -89
10000.00
185
4991.00
11 -AUG -90
10000.00
0
4719.00
3-47/Q-35
28 -FEB -88
10000.00
216
4488.00
16 -OCT -88
10000.00.
218
4257.00
20 -OCT -88
10000.00
209
4359.00
29 -MAR -89
10000.00
214
4278.00
15 -AUG -89
10000.00
215
4316.00
04 -JUN -91
10000.00
216
4157.00
3-49/J-40
30 -SEP -87
10000.00
221
4891.00
12 -APR -88
10000.00
211
3492.00
15-JUL-88
10000.00
218
4443.00
10 -AUG -88
10000.00
218
4442.00
30 -APR -89
10000.00
219
4332.00
07 -MAY -90
10000.00
226
4415.00
07 -MAY -90
10000.01
226
4644.00
28 -DEC -91
10000.00
217
3328.00
29 -DEC -91
10000.00
215
3366.00
4-02/Q-28
04 -MAY -88
10000.00
205
4785.00
11 -AUG -90
10000.00
0
4656.00
17-JUL-91
10000.00
191
4821.00
4-04/T-26
11 -AUG -90
10000.00
0
4762.00
- - 4-06/Q-32
22 -SEP -87
10000.00
211
4883.00
09 -DEC -87
10000.00
216
4600.00
18 -FEB -89
10000.00
216
4226.00
31-JUL-89
10000.00
212
4220.00
05 -APR -90
10000.00
211
4365.00
13 -DEC -91
10000.00
212
4038.00
4-08/P-27
24 -SEP -87
10000.00
210
4895.00
26 -APR -88
10000.00
211
4542.00
14-NOV-88
10000.00
212
4617.00
23-NOV-88
10000.00
216
4581.00
20-NOV-90
10000.00
212
4566.00
12 -OCT -91
10000.00
214
4773.00
12 -OCT -91
10001.00
215
4691.00
4-14/R-34
14 -AUG -90
10000.00
0
4523.00
19 -AUG -90
10000.00
152
4470.00
30-NOV-91
10100.00
101
4661.00
4-18/S-30
22 -SEP -89
10000.00
0
4381.00
22 -SEP -89
10000.01
0
4362.00
Time
Shut-in
Hr
Report Run Date: 26 -FEB -92
User ID: EDAN036
Well Name
4-18/S-30
4-20/M-35
4-26/0-34
4-28/N-37
4-42/P-38
4-46/N-39
Page
Static Pressure Report
Test
BH
Time
TEST DATE
Depth
Temp
PBAR
Shut-in
DD -MM -YY
---------
ss
--------
F
-----
psia
Hr
22-DEC-89
10000.00
186
-------
4289.00
-------
0
07 -JAN -90
10000.00
205
4284.00
0
07 -APR -90
10000.00
217
4342.00
0
08 -APR -90
10000.00
217
4405.00
0
08 -AUG -90
10000.00
209
4237.00
0
16 -AUG -90
10000.00
211
4405.00
0
12 -JUN -91
9964.00
211
4048.00
0
12 -JUN -91
9968.00
230
4432.00
0
20 -SEP -87
10000.00
208
4891.00
0
12 -AUG -88
10000.00
213
4376.00
0
12 -FEB -89
10000.00
218
4318.00
0
06 -MAR -90
10000.00
220
4340.00
0
07 -MAR -90
10000.00
220
4438.00
0
25 -MAY -91
10112.00
225
4776.00
0
25 -MAY -91
10116.00
225
4771.00
0
12 -AUG -91
9954.00
215
3929.00
0
18 -SEP -88
10000.00
213
4411.00
0
19 -DEC -88
10000.00
213
3975.00
0
21 -FEB -89
10000.00
213
3909.00
0
18 -APR -89
10000.00
208
4019.00
0
22 -SEP -89
10000.00
213
4132.00
0
23 -SEP -89
10000.00
213
3989.00
0
08 -APR -90
10000.00
220
4147.00
0
09 -APR -90
10000.00
220
4030.00
0
11 -AUG -90
10000.00
212
3970.00
0
16 -AUG -90
10000.00
212
3837.00
0
11 -FEB -91
10000.00
0
3872.00
0
25-NOV-88
10000.00
216
4704.00
0
07 -MAY -89
10000.00
217
4015.00
0
08 -MAY -89
10000.00
217
4794.00
0
28-JUL-90
10056.00
0
4386.00
0
28-JUL-90
10065.00
0
4612.00
0
07 -SEP -91
10090.00
0
4854.00
0
07 -SEP -91
10000.00
0
4844.00
0
16 -SEP -91
9000.00
215
4083.00
0
22 -SEP -87
10000.00
212
4896.00
0
26 -JUN -88
10000.00
214
4553.00
0
27 -MAR -89
10000.00
218
3977.00
0
11 -FEB -90
10000.00
217
4272.00
0
08 -APR -90
10000.00
216
4143.00
0
10 -AUG -90
10000.00
215
4080.00
0
12 -AUG -91
10000.00
216
3643.00
0
12 -AUG -90
10000.00
217
4247.00
0
Report Run Date: 26 -FEB -92
User ID: EDAN036
Page 9
Static Pressure Report
Test
BH
Time
TEST DATE
Depth
Temp
PBAR
Shut-in
Well Name
DD -MM -YY
ss
F
psia
Hr
----------
4-46/--39
---------
13 -AUG -91
--------
10000.00
-----
215
-------
3877.00
-------
0
28 -AUG -91
10000.00
217
4005.00
0
4-48/K-43
11 -SEP -90
10000.00
224
4324.00
0
4-50/K-41
29 -APR -90
10000.00
221
4977.00
0
29 -APR -90
10000.01
221
4426.00
0
25 -JUN -91
10080.00
228
5111.00
0
01-JUL-91
10083.00
224
4460.00
0
5-01/SD-07
27 -MAR -88
10000.00
211
4812.00
0
10 -AUG -90
10000.00
214
4714.00
0
5-02/SD-10
11 -AUG -90
10000.00
0
4660.00
0
15 -AUG -90
10000.00
143
4693.00
0
SUBZONE 2A MPI
CUMULATIVE VOIDAGE
CUM ma
OCT87 JAN88 APR88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APR90 JUL90 OCT90 JAN91 APR91
DATE
BP EXPLORATION
P P91
5000
-Icy
4700
: � 1',
4500
4400
4300
4200
JUL91 OCT91 JAN92
SUBZONE 2B MPI
CUMULATIVE VOIDAGE
CUM MRH
00T87 JAN88 APR88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APA90 JUL90 OCT90 JAN91 APR91
DATE
BP EXPLORATION
P PSI
5000
4900
Fl -
4700
4600
4500
4400
4300
4200
J1.11-91 OCT91 JAN92
CUM Aria
4000
3000
2000
1000
0
-1000
IPT1I61(
-3000
-400C
OCT87 JAN88 APR88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APR90 UL90 OCT90 JAN01
DATE
SUBZONE 3A MPI
CUMULATIVE VOIDAGE
P PSI
5000
BP EXPLORATION
4900
,:ml
4700
4500
4400
4300
4200
APR91 JUL91 OCT91 JAN92
CUM MRS
13000
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
SUBZONE 3B/3C MPI
CUMULATIVE VOIDAGE
P PSI
5000
E.
mm
4700
4600
4500
4400
4300
EKpii7
4100
0{ 14000
OCT87 JANS8 APR88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JANBO APROO JUL90 OCT90 JAN91 APR91 JUL91 OCT91 JAN92
DATE
BP EXPLORATION
CUM WE
6000
5000
4000
3000
2000
1000
0
OCT87 JAN88 APR88 JJL88 OCTSS JAN89 APA89 JUL89 00T89 JAN90 APROO JUL90 OCT90 JAN91
DATE
SUBZONE 3A NIAKUK
CUMULATIVE VOIDAGE
BP EXPLORATION
P PSI
5000
4900
4800
4700
.=ml
4500
4400
4300
4200
APR91 JUL91 OCT91 JAN92
CUM MRS
7000
4000
R11�
2000
1000
0
OCT87 JAN88 APR88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APR90 JUL90 00T90 JAN91
DATE
SUBZONE 2A SDI
CUMULATIVE VOIDAGE
BP EXPLORATION
P PSI
5000
4900
4700
4600
4500
4400
4300
4200
APR91 JUL91 OCT91 JAN92
cum Wa
30000
20000
10000
SUBZONE 2B SDI
CUMULATIVE VOIDAGE
P P91
5000
4900
4800
4700
4500
4400
4300
01, d I I I I I I I I I . 4200
OCT87 JAN88 APR88 JUL68 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APR90 JUL90 OCT90 JAN91 APR91 JUL91 OCT91 JAN92
DATE
BP EXPLORATION
CUM MRS
3000
2000
1000
0
OCT87 JAN88 APS88 JUL88 OCT88 JAN89 APR89 JUL89 OCT89 JAN90 APR90 JUL90 OCT90 JAN91 APR91 JLIL91
DATE
SUBZONE 3A SDI
CUMULATIVE VOIDAGE
BP EXPLORATION
P PSI
5000
4900
4800
4700
•:1c
4500
L•LK0
4300
4200
OCT91 JAN92
CUM AIRS
20000
19000
18000
17000
16000
15000
14000
13000
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
OCT87 JAN88 APR88 JULSS OCT88 JAN89 APR89 JUL89 OCT89 JANSO APR90 JUL90 OCT90 JAN91 APR91
DATE
SUBZONE 313/3C SDI
CUMULATIVE VOIDAGE
BP EXPLORATION
P PSI
5000
4900
4800
4700
4600
4500
4400
4300
4200
4100
4000
3900
3800
JUL91 OCT91 JAN92