Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
190-063
Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ?0- 0~ File Number of Well History File PAGES TO DELETE RESCAN [] Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/TYpe OVERSIZED [] Logs of various kinds [] Other Complete COMMENTS: Scanned by: ~ Bren Vincent Nathan Lowell -- [] T° RE-SCAN Date:5 · q ,0,~ Is' ~r~ Notes: Re-Scanned by: Beverly Bren Vincent Nathan Lowell Date: /s/ NOTScanned.wpd "1; . '* ') ') ~TO AkRGY 1~pft)1øð XTO Energy Inc. 200 North Loraine Suite 800 Midland, Texas 79701 432-682-8873 432-687-0862 (Fax) January 7, 2005 Alaska Oil and Gas Conservation Commission Attn: Mr. John Norman 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 RE: Well Completion Report: Well C22A-26 P&A RECEIVED JAN 1 8 2005 Alaska Oil & G as Cons C . Anchorage. ommlssion Dear Mr. Norman, XTO Energy, Inc. hereby submits its Well Completion Report (Form 10-407) for the work performed to plug and abandon well C22A-26 on Platform C, in the Middle Ground Shoal Field of Cook Inlet, AK. After the abandonment of the lower portion of the wellbore, the well was sidetracked as the C22A- 26LN. Please find attached the following information for your files: 1. Form 10-407 Well Completion 2. Daily Operations Report 3. Post P&A Wellbore Schematic If you have any questions or require additional information, please contact me at (432) 620-6743. Sincerely, 9~i.y Paul L. Figel Engineering Manager Cc: Scott Griffith Tim Smith SCANNED FES 0 14 2005 .. .. r- ,'WI ALAs~1 AND ~:~T~g~S~':;~ON COMMISSldN WELL COMPLETION OR RECOMPLETION REPORT AND LOG oilD GasD Plugged 0 Abandoned[2] SuspendedD WAGD 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development D Exploratory D GINJD WINJD WDSPLD No. of Completions 1 Other Service D Stratigraphic TestD 2. Operator Name: 5. Date Comp., Susp., or .; 12. Permit to Drill Number: XTO Energy Inc. Aband.: 10/28/2004 90-63 3. Address: 6. Date Spudded: 13. API Number: 200 North Loraine, Suite 800, Midland, Texas 79701 July 18,1990 50-733-20415 4a. Location of Well (Governmental Section): Platform C, Leg 4 7. Date TD Reached: 14. Well Name and Number: Surface: Cond 30, 500' FSL, 1538' FEL, Sec 23, T8N, R13W, S.M. December 27, 1990 C22A-26 Top of Productive Horizon: 8. KB Elevation (ft): 15. Field/Pool(s): 3843' FEL, 2414' FNL, Sec 26, T8N, R13W, S.M. 105' ~~Ground Shoal Field Total Depth: 9. Plug Back Depth(MD+TVD): I'tI::C~/' .I ,3217' FEL, 2414' FNL, Sec 26, T8N, R13W, S.M. 11824' + 9789' ç, Vt:D 4b. Location ~fjvell (Statr- ~;:¡sp. Plan~oor~inates): 10. Total Depth (MD + TVD): . 16. pr~tf>Efi~a!!On:'-' . SUrface:'fj 247418-6 1J -)\ ~31417 Zone- AK4 12140' + 10020' AI.;~¡'') APL 1875~ ¿005 TPI: x- 229091 y- 2471239 Zone- HC 11. Depth Where SSSV Set: :¡y: W.h&ß8f~~t: Total Depth: x- 229806 y- 2471445 Zone- HR N/A N/AAnchn.. $. Cornmisf~¡(Jn 18. Directional Survey: Yes 0 No 0 19. Water Depth, if Offshore: 20. Thicknessõtffmmafrost: . '/ 73 feet MSL N/A FALSE 21. Logs Run: N/A CASING 13-3/8" 9-5/8" WT. PER GRADE FT. 54.5 K55 43.5,47 L80 26,29,32 L80, P110 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD TOP BOTTOM TOP BOTTOM HOLE SIZE Surf 1155' Surf 1150' Surf 9797' Surf 8216' 8989' 12039' 7324' 9958' CI;:MENTING RECORD AMOUNT PULLED 0 0 0 22. 7" 17 -1/2" 12-1/4" 8-1/2" 441 SXs 560 sxs 1500 sxs 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): N/A SIZE N/A TUBING RECORD DEPTH SET (MD) PACKER SET (MD) 24. 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 11960' - 11819' 190 sxs . Date First Production: PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.): Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ... Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity - API (corr): Press. 24-Hour Rate -. 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). J Submit core chips; if none, state "none". /oJ Þ4vt.Jð<'?1flfÛ\-r N/A RBDMS BFL JAN 2 0 2005 (l:!.,:z.i '-l?.tJ _.~~.."---' Gf~ Form 10-407 Revised 12/2003 CONTINUED ON REVERSE JUùL1CATE TVD " ",."''í,. 29. ) FORMATION TESTS . ~ Include and briefly sun II.1arize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". NAME GEOLOGIC MARKER MD "- ) 28. N/A 30. List of Attachments: Well bore Schematic & Daily Operations Report 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Paul Figel Printed Name: pa( F~el r;: . Signature: ~ a...f rß. 71 Title: Engineer Manager Phone: 432-620-6743 Date: 1/12/2005 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion'), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". ~-":,,.:.¡~ ","~'/\~ lit. ,.;p.~..: II!: Form 1 0-407 Re~is~dA~/~?~~ r1 ::,..:-.2 Jt-...- ~t ~ "~I . ) ) 1 XTO Energy Inc. C22A-26 Daily Well Report - -'.,- - - ""'p- - -- ~ --.- --.n...- -....... r..'- -. i' -., - - --- - ~ - - - p -- ""n - ---,--_.. ..--~.... J Well # 22A-26 : .--.---". ~--~ -- :MIDDLE GROUND SHOAL C ,,,'mN"'~""''''''''''''''''''''N''' Objective: P&A Well 10/6/04 Drlg permit approved by the AOGCC. Permit #204-182, API# 50-733-20415-01. ~JWIQ//~AWf4W'~IHIff~#/'wI--III##IIIMWWI.W#ðlW_:Ø!WI#IWIWÑ'IaW#~~IIMWfI@W~~#/~#_AWf¡' 10/24/04 NU BOP's. Circ 10 hrs, Build Mud Vol/Wt 6 hrs, Monitor Well 4 hrs, NU/ND Tree 3 hrs, Pressure/Inject/Lot/Fit 1/2 hr, NU/ND BOP/Diverter 1/2 hr. RU to kill well. Filled pits w/FIW. Prep for boat (boat unable to load @ dock due to wind & wave action). Allowed well to bleed off fr tbg & tbg annulus. Press tstd mud lines to 1,000 psi. Circ well to prod w/FIW. Circ well thru choke to pits. Set BPV. Std to ND tree, 2-7/8" x 9-5/8" annulus built to 70 psi. Bled the 500 psi fr the 9-5/8" x 13-3/8" annulus, which stopped the tbg annulus fr bldg press. ND & pulled tree. Prep to PU & install riser. 10/25/04 Prep To LD 2-7/8" Tbg. MW 8.5, NU/ND BOP/Diverter 14 hrs, Test BOPS/Diverter 7-1/2 hrs, LD/PU Drill Pipe/Tbg 2 hrs, Circ 1/2 hr. NU BOPS. Chg out BPV for 2 way check. Attempted to tst BOPS. ND riser flange above tbg spoo. PU BOPS. Put plug in control line port. Landed BOPS & retightened flange. Tstd BOPS 250-5,000 psi. NU drlg nipple. Worked tbg free. Pulled hanger to rig floor. RU & circ tbg. -,w,'. .",,,,.I_..!¡;,;,¡;__~.wmø. 10/26/04 PU 3.5" DP W/PBR Spear. MW 8.5, LD/PU Drill Pipe/Tbg 21 hrs, PU/LD BHA & Tools 3 hrs. LD 340 jts 2-7/8", 6.5#, EVE, 8rd tbg, SSSV, 10 GLM's, Otis sliding sleeve, PBR seals. MU PBR spear & BHA. PU 3-1/2", 15.50, S-135 drill pipe. 10/27/04 RIH To Lay Cmt Plug. MW 8.5, LD/PU Drill Pipe/Tbg 10 hrs, Trip 4-1/2 hrs, Circ 4 hrs, PU/LD BHA & Tools 3-1/2 hrs, Slip & Cut Drill Line 2 hrs. PU 3-1/2",15.50, S-135 DP. Speared PBR @ 10,954'. Pulled & rei pkr. Dropped bar. Opened pmp out sub. Circ well. POOH w/pkr. Stood back DC's. LD BPR, pkr & tail pipe. PU cmt stinger. 10/28/04 Dress Off Cmt Plug. MW 8.5, Trip 14 hrs, Circ 4 hrs, LD/PU Drill Pipe Tbg 3 hrs, PU/LD BHA & Tools 1-1/2 hr, Cmt Plug 1 hr, W & R 1/2 hr. TIH w/3-1/2" DP & 3-1/2" muleshoe & tagged btm @ 11,890'. Spotted high vis 10.3 ppg pill @ 11,890'. Mixed & pmpd 190sx CI "G" w/3% CD-32, .28% R-3, .5% FL-63, 1 gps FP-6L. Disp cmt w/68 BFW. POOH. PU used 6" bit & 7" scraper. TIH & tagged cmt @ 10,700'. Dress of cmt plug 10,700'-10,760'. --...-.¡..,-..."""...."""""""'" 10/29/04 Circ. Circ 12 hrs, Trip 7-1/2 hrs, W & R 4 hrs, Tst Csg 1/2 hr. Drld cmt fr 10,760'-10,960'. Weight tst, set 15K dwn on cmt plug, OK. Tstd csg to 3,000 psi for 30 min, OK. TOOH. PU window mill (top mill full 6"). TIH to 10,960', unable to rotate. Top drive stalling. MU 200 bbls gel & lubricant & pmpd around. 10/30/04 PU Whipstock Assembly. MW 8.7, Vis 36, PV 5, YP 14, Gel 5/5, pH 8.7, WL 20.0, Alk 0.1, CI13,000, Ca 150, Sd tr, Solids 2.0, Oil 0.1, Added 300sx Barite, 40sx Bicarbonate Soda, 3sx Biozan, 60sx Durogel, 10sx Flo- Vis, 5sx Lubricant EP & 250sx MI Gel. Circ 8- 't\.I. ... .. ,~ .. ) ) 2 1/2 hrs, Other 5-1/2 hrs, Trip 6-1/2 hrs, PU/LD BHA & Tools 3-1/2 hrs. Circ adding gel & lubricant. Est rot. TOOH & LD mill assembly & jars. PU & RIH w/bridge plug. Corelated & set plug @ 10,902'. POOH & RD WL. PU whipstock assembly. Attempted to tst MWD (would not tst). Changed out MWD collar. 10/31/04 WWW~~~~ ",~,,";',Mwm~~mw. Milling Window & Formation. MW 8.7, Vis 40, PV 5, YP 14, Gel 5/5, pH 8.5, WL 20.0, Alk 0.1, CI13,000, Ca 150, Sd tr, Solids 2.0, Oil 0.1, Added 8sx Flo-Vis, 1sx Lubricant EP & 5sx Soda Ash. Trip 8-1/2 hrs, Mill/Cut Sect Or Window 8 hrs, Rig Repair 5 hrs, PU/LD BHA & Tools 1-1/2 hr, Orient Tool Face 1 hr. Surf tstd MWD, tstd OK. Orient w/whipstock. TIH slowly w/whipstock assembly to 10,683'. Washed dwn fr 10,683', oriented tool face. Tagged bridge plug @ 10,902'. Set whipstock & oriented @ 52 deg left of high side. Milled window 10,883'-10,886'. Mill window & formation 10,886'-10,908'. .. Átg MGS C22A-26 Cook Inlet, Alaska Leg 4, Conductor 30 API No.: 50-733-20415 Spud: 7-18-90 Replaced C-line well P&A'd June '90 Conductor Csg: 24" @ 370'. Surf Csg: 133/8",54.5 Ib, K55, BTC. Set @ 1,155'. Cmt'd wi 441 sx. Intermediate Csg: 9 5/8", L80 LTC. Set @ 9,797'. Cmt'd wi 560 sx. Surf - 4,123' : 43.5# 4,123 -9,797' : 47# SQZ'd TaL wi 160 sk on 12-29-90. Prod Liner: 7" @ 12,039'. TaL @ 8,989'. Cmt'd w/1500 sk. 8,989 - 10,280' : 26# L80 10,280 - 10,691': 29# L80 10,691 - 12,039' : 32# P110 PBTD: 11,819' MD (9,786' TVD) TO: 12,140' MD (10,020' TVD) (Top of Fish-Bit BHA @ 12,039') ) Abandoned Status ~ .............. ~ ~ %/i. ,-...................~..........'......//.. p~ ~øa ) PLF 1-7-05 KB: 35' Water Depth: 73' MSL P&A'd wi 190 sk cmt on 10-28-04. TOC @ 10,960'. HC-HD: 11076'-11104' MD (9284'-9304' TVD) HD-HE: 11160'-11173' MD (9341'-9350' TVD) HE-HF: 11186'-11218' MD (9357'-9381' TVD) HI-HK: 11274'-11322' MD (9419'-9451' TVD) HK-HN: 11336'-11472' MD (9460'-9549' TVD) HN-HR: 11520'-11640' MD (9581'-9660' TVD) HR-HZ: 11670'-11780' MD (9681'-9758' TVD) "..--... ~ ~i~iæ (ID~ ~~~~[{~ AI,ASIiA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Bobby Smith Drilling Operations Manager XTOEnergy, Inc. 3000 North Garfield, Ste 175 Midland, Texas 79705 t~ Re: MGS C22A-26 Sundry: 304-347 Dear Mr. Smith: Enclosed is the approved Application for Sundry Approval relating to the above- referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. BY ORDER OF THE COMMISSION DATED this-.&. day of September, 2004 Enc!. "..--... ~ Jt!2 September 10, 2004 Mr. John Norman, Chair Alaska Oil and Gas Conservation CommIssion 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval; P&A of MGS Well C22A-26, Cook Inlet, Alaska Dear Mr. Norman, XTO Energy, Inc. hereby applies for Sundry Approval of its plan to permanently abandon the perforations existing in Middle Ground Shoal Well C22A-26 to allow the sidetracking of that well to drill C22A-26LN. The Application for Permit to Drill C22A--26LN is submitted under separate cover. The anticipated commencement date of this work is approximately October 10, 2004. The existing tubing and packer will be pulled and the well plugged with cement selover the interval from PBTD to 115' above the topmost existing perforation. After the cement plug integrity is tested with weight, the well wìll be sidetracked from the top of the plug to a new location in the reservoir. Pertinent information attached to this application includes the following: 1) 2) 3) 4) Form 10-403 Application for Sundry Approval A summary of the proposed abandonment procedure A schematic showing the current condition of the wellbore A schematic showing the proposed abandonment If you have any questions or require additional information, please contact me at (432) 620-6718 or Bill Penrose at (907) 258-3446. Sincerely, ~L~ Bobby L. Smith Drilling/Operations Manager ORIGINAL RECE'VED SEP 1 3 7.004 '. 'on A\as\(a Oil & Gas Cons. Commlll' Anchorage XTO ENERGY, INC. enclosures xro Energy Inc. . 3000 N. Garfield. Suite 175 . Midland, Texas 79705 . (915) 682-8873 . Fax: (915) 687-0862 "..--... ~ A ~°C:>c" Ct/(~ ¿--J.-J ...-~ /'C STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 ~5<: 1. Type of Request: Abandon ~ Suspend U Operational shutdown 0 Perforate LJ WaiverQ Annular Dispos. U Alter casing 0 Repair well 0 Plug Perforations 0 Stimulate 0 Time Extension 0 Other 0 Change approved program 0 Pull Tubing 0 Perforate New Pool 0 Re-enter Suspended Well 0 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: XTO Energy, Inc. Development 0 Exploratory 0 190-063 3. Address: Stratigraphic 0 Service 0 6. API Number: 3000 North Gañield, Suite 175, Midland TX 79705 50-733-20415-00 7. KB Elevation (ft): 9. Well Name and Number: 105' ASL MGS C22A-26 8. Property Designation: 10. Field/Pools(s): ADL-18756 Middle Ground Shoal 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12,140' 10,020' 11,819' 9,786' None None Casing Length Size MD TVD Burst Collapse Structural Conductor 370' 24" 370' 370' N/A N/A Surface 1,155' 13-3/8" 1,155' 1,150' 2,730 psi 1,130 psi Intermediate 9,797' 9-5/8" 9,797' 8,216' 6,330 psi 3,810 psi Production Liner 3,050' 7" 12,039' 10,019' 7,240 psi 5,410 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11,076' -11,780' 9,284' - 9,758' 2-7/8" L-80 11,014' Packers and SSSV Type: Baker "HB" retrievable packer, Packers and SSSV MD (ft): Packer @ 10,961', SSSV @ 302' Otis "XXO/BXE" SSSV 12. Attachments: Description Summary of Proposal ~ 13. Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Development 0 Service 0 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 10/1 0/2004 Oil 0 Gas 0 Plugged 0 Abandoned 0 16. Verbal Approval: Date: WAG 0 GINJ 0 WINJ 0 WDSPL 0 Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Bill Penrose 258-3446 Printed Name - Bobby Smith Title Drilling/Operations Manager Signature 12' /ð I ( ~d Phone (432) 620-6718 Date 9AJ~c/' I COMMISSION USE ONLY , / Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ?óIJ 9'1*1 Plug Integrity 0 BOP Test ~ Mechanical Integrity Test 0 Location Clearance 0 Qth" ,~~ \{ 'M ~-\ \:, ~, ~ \> ~ l\(gf\ ~ 0. ~\ L.~ 'f S<è rc>-J -~ S"_"e"'FO~R.q"¡£-ko~ RlDlsBFL SEP 1 SEP 1 32004 (7ì I/í. . .. . . 1\ ?nn~ Alaska Oil & Gas Cons. t;ul11I1\I,,¡un If/' ") RIG I N A L BY ORDER OF Anchorage . ft~ App<eved by, 7 Jw tJ COMMISSIONER THE COMMISSION D," 9 i6 ~ 'f../ Form~03 R~sed 12/~ INSTRUCTIONS ON REVERSE S&bmit in£ . uphcate "..--... ~ XTO Energy, Inc. MGS C22A-26 P&A Procedure 1. R/U slickline, Rill to sliding sleeve at 10,903' and shift sleeve open. If sleeve will not open, fe-dress slickline, Rill to GLM #10 at 10,869' and pull the 5/16" orifice. Ifthe tool will not fall to GLM #10, pull the valve from the deepest GLM that it is possible to reach. POR and RID slickline. 2. Move rig over well. Mix a 9.0 ppg water-base mud system. Kill well by circulating mud down the tubing, through the sliding sleeve at 10,869' (or open-pocket GLM if the sleeve would not shift) and up the annulus. While circulating, weight up the mud in small increments until it is heavy enough to kill the well. 3. Install BPV, NID tree, NIU BOPE. Test BOPE to 5,000 psi. [Note: at the discretion of the Drilling Supervisor and AOGCC Inspector (if present), blind rams will be tested after tubing is pulled from hole if there is a chance a gas bubble will settle under BPV, making it difficult or dangerous to release.] Pull BPV. 4. M/U landing joint to tubing hanger, back out lock-down screws and pull hanger to drill floor, shearing loose the packer at 10,961'. Circulate mud until returns are clean and uniform. 5. Ensure well is dead and POR with tubing, checking for NORM while paR. LID tubing and completion jewelry and send to shore. 6. M/U cementing stinger on 3-1/2" drill pipe, and Rill to the PBTD at :t12,039' (top of fish). 7. Mix and pump 10 bbls of fresh water followed by 40 bbls of cement as follows: Cement to consist of 190 sx Class G + 0.4% bwoc R-3 + 0.3% bwoc CD-32 + 0.5% bwoc FL-63 + 1 gal/1O0sx FP-6L + 43.6% fresh water: Slurry Wt. 15.8 ppg Slurry Yield 1.15 cf/sk Mix Water 4.92 gps Displace cement to the stinger then pull up slowly while setting a cement plug from PBTD at 10,039' to 10,900' (50' above KOP of the subsequent sidetrack). 8. After setting the plug, pull up an 5 additional stands, reverse out and paR. "..--... ~ 9. wac 8 hours then RIH with a 6" cleanout bit and tag cement. Clean out cement to 10,960'. Weight-test cement plug with 15,000 lbs on bit without circulation. paR. 10. MIU a casing scraper for 7", 32# casing and Rill to TOC at 10,960'. Pressure test the 7" casing and cement plug to 3,000 psi. 11. POR and proceed with sidetrack procedure to drill C22A-26LN. ;[19 MGS C22A-26 Cook Inlet, Alaska Leg 4, Conductor 30 API No.: 50-733-20415 Spud: 7-18-90 Replaced C-line well P&A'd June '90 Conductor Csg: 24" @ 370'. Surf Csg: 133/8",54.5 Ib, K55, BTC. Set @ 1,155'. Cmt'd wI 441 sx. Intermediate Csg: 95/8", L80 LTC. Set @ 9,797'. Cmt'd wI 560 sx. Surf - 4,123' : 43.5# 4,123 -9,797' : 47# SOl'd TOL wI 160 sk on 12-29-90. Prod Liner: 7" @ 10,280'. TOL @ 8,989'. Cmt'd w/1500 sk. 8,989 - 10,280' : 26# L80 10,280 -10,691' : 29# L80 10,691 - 12,039' : 32# P110 PBTD: 11,819' MD (9,786' TVD) TD: 12,140' MD (10,020' TVD) (Top of Fish-Bit BHA @ 12,039') "..--... Present Completion ~ PLF 5-13-04 KB: 35' Water Depth: 73' MSL Tubing: 2-7/8", 6.5#, L80, EUE, 8rd Set 3-27-91. ~ MD TVD GLM #1 1948' 1897' GLM #2 3784' 3395' GLM #3 5496' 4669' GLM #4 6893' 5642' GLM #5 7878' 6363' GLM #6 8643' 7077' GLM #7 9256' 7687' GLM #8 9773' 8190' GLM #9 10321' 8694' GLM #10 10869' 9137' .EttQ.. E2!i ~ 993 12 950 1000 12 925 970 12 960 16 879 940 16 868 925 16 849 905 12 835 890 12 818 1146 12 5/16" orifice Otis "XXOI BXE" SSSV @ 302' Otis XD Sliding Sleeve @ 10,903' Baker 15' PBR (80-32 for "HB" Pkr) @ 10,954' Baker "HB" Pkr (40000# shear) @ 10,961' Otis "XN" Profile Nipple (2.205" ID) @ 10,993' Otis Wireline Re-entry Guide @ 11,004' HC-HD: 11076'-11104' MD (9284'-9304' TVD) HD-HE: 11160'-11173' MD (9341'-9350' TVD) HE-HF: 11186'-11218' MD (9357'-9381' TVD) HI-HK: 11274'-11322' MD (9419'-9451' TVD) HK-HN: 11336'-11472' MD (9460'-9549' TVD) HN-HR: 11520'-11640' MD (9581'-9660' TVD) HR-HZ: 11670'-11780' MD (9681'-9758' TVD) ;[19 MGS C22A-26 Cook Inlet, Alaska Leg 4, Conductor 30 API No.: 50-733-20415 Spud: 7-18-90 Replaced Coline well P&A'd June '90 Conductor Csg: 24" @ 370'. Surf Csg: 133/8",54.5 Ib, K55, BTC. Set@ 1,155'. Cmt'dw/441 SX. Intermediate Csg: 9 5/8", L80 LTC. Set @ 9,797'. Cmt'd wI 560 sx. Surf - 4,123' : 43.5# 4,123 -9,797' : 47# SQZ'd TOL wI 160 sk on 12-29-90. Prod Liner: 7" @ 10,280'. TOL @ 8,989'. Cmt'd w/1500 sk. 8,989 -10,280' : 26# L80 10,280 - 10,691' : 29# L80 10,691 -12,039': 32# P110 PBTD: 11,819' MD (9,786' TVD) TO: 12,140' MD (10,020' TVD) (Top of Fish-Bit BHA @ 12,039') ,""--'" Proposed Abandonment ~ PLF 5-13-04 KB: 35' Water Depth: 73' MSL TOC I KOP at 10,960' HC-HD: 11076'-11104' MD (9284'-9304' TVD) HD-HE: 11160'-11173' MD (9341'-9350' TVD) HE-HF: 11186'-11218' MD (9357'-9381' TVD) HI-HK: 11274'-11322' MD (9419'-9451' TVD) HK-HN: 11336'-11472' MD (9460'-9549' TVD) HN-HR: 11520'-11640' MD (9581'-9660' TVD) HR-HZ: 11670'-11780' MD (9681'-9758' TVD) THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 2000 P M C:LORI~MFILM. IX)C E E L A T E R IA L UN THIS MARK E W D E E R' R Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 April 26, 1991 Alaska Oil and Gas Conservation Commi ss i on 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen' SUBJECT' SUBMISSION OF WELL COMPLETION REPORT AND LOG FOR WELL C22A-26 Enclosed, in duplicate, is the Well Completion Report and Log for Well C22A-26. If you have any questions, please call Ms. Susan Brown-Maunder or Ms. Susan Murnan at (907) 276-2545. Very truly yours, W. F. Simpson Manager Regulatory Affairs WFS/slm Enclosures RECEIVED APR A/ask~ Oli& Gas Cons, Commission Anchorage aogcc/comp 1 ete. doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Welt OIL ,~ GAS ~ SUSPENDED ~2 ABANDONED [ ~'...'~ ....... Classification of Service Well SERVICE ~ J s0- 733_204!5.~o J9. Uni~or Lease Name Middle Ground Shoal ~ O. Well Number C22A-26 11. Field and Pool 2. Name of Operator Shell Western E & P Inc. 3. Address .~ V~'~:j"E~ I 601 West 5th Aven~te, Suite 800. Anchoraae. AK qq_~Ol~ , ~,.~_ ? 4. Locat,o~ofweilatsurface Platform C.' Le~ 4, CondUctor 30 .;~~; A~To,,rodu:in~.~.~ 3843' FEL & 2414' FNL of Sec. 26. TBN. R13~ _ A~Tot~D~,~h 3217' FEL & 2414' FNL of Sec. 26. TBN. R13~ Middle Ground Shoal 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. "6" Pool 105' KB I ADL 18756 j13. DateT.D. Reached J14. OateComp.,Susp. orAband. J15. Water Depth, ifoffshore J16. No. of Completions t 12/27/90 1 3/27/91 73 feetMSL ! 1 J 11,824' + 9789' IYES ~ NO [] 302' feetMD J N/A 12. Date Spudded 7/18/90 17. Total Depth (MD+TVD) 112,140' + 10,020' i 22. Type Electric or Other Logs Run iAtlas DIL/BHCAL/GR/SP/CT from 12,020' - 9797', 23. CASING, LINER AND CEMENTING RECORD WT. PER FT. GRADE HOLE SIZE 54.5# K-55 SETTING DEPTH MD TOP BOTTOM 0 1155' 0 9797' 8989' 10,691' 10~691' 12~039' 43.5-47# L-80 7" L-80 7" 32# P-110 CASING SIZE 13-3/8" 9-5/8" 26-29# 17-1/2" 12-1/4" 8-1/2" 8-1/2" CEMENTING RECORD 660 sx + additives 560 sx + additives 1500 sx + additives AMOUNT PULLED N/A N/A N/A 2S. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) ACID, FRACTURE, CEMENT SQUEEZE, ETC. N/A 26. DEPTH INTERVAL (MD) IAMOUNT& KIND OF MATERIAL USED AT w/ 2000 gal HC1. acid Prop Frac w/50,400# ISP AT w/3200 H£1 & l~nn 11,670-11~780' 11~520=11~640' 11,076=11,472' 24. Perforations open to Production (MD+TVD of Top and Bottom and TVD SPF 9284-9304' 4 9341-9350' 4 9357-9381' 8 9419-9451' 4 9460-9549' 4 9581-9660' 3 9681-9758' 4 interval, size and number' MD 11,076-11,104 }~,160-11,173 11,186-11,218 ,274-11,322 11,336-11,472 11,520-11,640 11,670-11,780 27. PRODUCTION TEST JMethod of Operation (Flowing, gas lift, etc.) Gas Lift OIL-BBL 40 Date First Production 3/27/91 GAS-MCF WATER-BBL 0 44 WATER-BBL 88 CHOKE SIZE IGAS'OILRATIO lOlL GRAVITY-APl (corr) 35,7 JHours Tested 12 PRODUCTION FOR TEST PERIOD · Date of Test 4-12-91 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF Press. 80 790 24-HOUR RATE e 80 0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. REEEIVED APR 2 9 t991 Alaska 0il & Gas Cons. C0mmissioa Anchorage Submit in duplicate / Form 10-407 Rev. 7-1-80 gals CONTINUED ON REVERSE SIDE OGIC MARKE MEAS. DEPTN G Pool 11,040' TRUE VERT. DEPTH 9258' 30. :IMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS Daily Report of Operations, Graphic of Completion 32. I hereby certify that the foregoing .s true and correct to the best of my knowledge Signed ~ ~ /'~'C~ ~ (/'~r'?'m~ //'-- - Title ~/=~,~-/4 ¢' ~'e-- ~ Date . INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: .Gas injection, water injection, steam iniection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken,'indicate "none". Form 10-407 DAILY REPORT OF OPERATIONS C22A-26 COMPLETION DATE ACTIVITY 12/31/90 STRAP, DRIFT, & PICK UP 3.5" 9.3# TUBING. CLEAN (2) MUD PITS. - RIG UP SUN DRLG. PRODUCTS FILTERING SYSTEM. - FILL PITS W/ FILTERED INLET WATER. (NOTE; TAKING FIW DOWNSTREAM OF DE & RUNNING IT THROUGH SUN SYSTEM BEFORE DUMPING IN PITS.) REVERSE CIRC. & DISPLACE MUD IN HOLE W/ FIW. - DUMPING ALL RETURNS OVERBOARD. CLEAN ALL MUD PITS, PUMPS, SUCTIONS, & ALL RELATED CIRCULATING EQUIP. NOTE; HAD TO WELD TROUGHS IN MUD PITS. (HOLES) EXISTING MATERIAL IS WORN OUT AND IS IN NEED OF REPAIR. START FILTERING UNIT, FILL PITS, & REVERSE CIRC. (DUMPING ALL RETURNS) 1/1/91 CIRC. FIW THRU SUN DRLG. FILTER SYSTEM. - PUMP XC-POLYMER SWEEP AND CIRC. SHORT TRIP BIT & SCRAPER TO TOP OF 7" LINER. - TIH TO 11,194'. CIRC. FILTERED FIW DUMPING ALL RETURNS. (REAL DIRTY) PREPARE TO TOOH. TOOH FOR RAM CHANGE, BOP TEST, & TO PICK PERFORATING ASSEMBLY ON 2 7/8" TUBING. NOTE; ALL 2 7/8" TUBING IS PICKED UP & STOOD BACK IN DERRICK. 1/2/91 1~3/91 TOOH W/ 3.5" WORK STRING. CHANGE VARIABLE RAMS TO 2 7/8". - CHECK RAM LOCKS W/ DOORS OPEN & RAMS IN THE CLOSED POSITION. TEST BOP & ALL RELATED EQUIP. TO 250/5000 PSI. - TEST HYDRIL TO 250/2500 PSI. PULL TEST PLUG & INSTALL WEAR BUSHING. HELD SAFETY MEETING W/ PRODUCTION & DRILLING CREW. - DISCUSS SCHEDULE OF EVENTS FOR PERF. & FRAC. - DISCUSS PROCEDURE FOR PICKING UP PERF. ASSEMBLY. - MAKE UP CIRC. HEADER. PICK UP PERF. ASSEMBLY. TIH W/ STDS. OF 2 7/8" 6.5# L-80 EUE 8RD TUBING. STRAP & DRIFT EA. STD FILL 2400' OF TUBING W/ FILTERED FIW. RIG UP ATLAS WIRELINE TO RUN GR FOR DEPTH CORRELATION. PICK UP WT. W/ BLOCKS : 120,000 SLACK OFF WT. " = 65,000 MAKE UP SAFETY VALVE. RIG UP ATLAS W.L. PACK OFF. RUN IN HOLE W/ GR. AND CORRELATE DEPTH OF RA MARKER AND FOUND 8.5 FT. LOW. PULL TUBING UP 8.5 FT. RECHECK AND FOUND MARKER DEAD ON. POOH AND RIG OUT W.L. MAKE UP HOWCO TEST HEAD AND PRESS. TEST TO 3000 PSI. (THE MANIFOLD WAS TESTED WHILE LOGGING) SET CHAMP II PACKER AT 11620'. ATTEMP TO SHOOT FLUID LEVELS WITH HOWCO BUT NO LUCK. CALL OUT PRECISION W.L. SER. TO SHOOT F.L. AND HAD EQUIPMENT FAILURE. PRESSURE ANNULUS TO 1300 PSI TO OPEN LPR-N VALVE. PRESSURE UP SLM/O30691A 1/4191 ]/5/91 TO 2600 PSI. TO FIRED GUNS. TOP SHOT AT 11670 AND BTM. SHOT AT 11781'. SHOOT F.L. ( AFTER PUTTING ROTARY SLIPS IN TABLE AND DECREASING NOISE, HOWCO FLUID LEVEL INSTRUMENTATION BEGAN TO WORK.) BLEED OFF ANNULUS & CLOSE LPR-N VALVE. - WELL SHUT IN. CYCLE OMNI VALVE. - REVERSE CIRC. W/ RETURNS GOING TO PRODUCTION HEADER. (HAD OIL) PUMPED 140 BBL. ATTEMPT TO PICK UP & OPEN BYPASS & RELEASE CHAMP II PACKER. BYPASS OPENED, BUT PACKER WOULD NOT UNSET. LEAVE WELL SHUT IN TO MONITOR BUILD UP. (WELL IS DEAD) WORK TUBING (170,000 MAX PULL) & ATTEMPT TO UNSET PACKER. (ORDER OUT TUBING CUTTER FROM ATLAS. - ORDER OUT FISHING TOOLS & MAN.) RUN IN W/ JET CUTTER ON WIRELINE & SHOOT TUBING @ 7000'. CIRC. & FILTER COMPLETION FLUID. FINISH CIRC. T.O.H. FROM CUT-OFF AT 7000 '(+ / -) REMOVE 2 7/8 IN. PIPE RAMS AND INSTALL 3 1/2" RAMS. PULL W.B. AND INSTALL TEST PLUG. TEST RAMS TO 5000 PSI. INSTALL WEAR BUSHING. MAKE UP TRISTATE 7 5/8" OVER SHOT WITH HOLLOW MILL GUIDE. T.I.H. WITH 3.5" TUBING. MILL OVER CUT OFF, LATCH ONTO FISH AND PULL LOOSE WITH 225,000 HOOK LOAD. (177,000 STRING LOAD) CIRC BTM UP THRU FILTER SYSTEM TO CLEAN UP ANY OIL BELOW PACKER. IN-STALLED 250 MESH SCREENS ON SHAKER. HAD 1325 UNITS ON B.U. GAS. CHECKED FOR FLOW. (ALL OK) P.O.O.H. AND CHECKED FOR FLOW SEVERAL TIMES. NO FLOW. PULLED AND LAYED DOWN FISH. PULLED REST OF B.H.A. ONE PACKER ELEMENT MISSING. PICKING UP MULE SHOE AND 180 FT. OF 3.5" TAIL PIPE BELOW HOWCO 7 "32# RTTS PACKER AND B.H.A. AS PER PROG. AND SLM 3.5" TUBING R.I.H. FINISH T.I.H. WITH HOWCO 7" 32# RTTS. SET PACKER TO CLOSE CIRC. SLEEVE. THEN PICK UP AND UNSEAT PACKER TO CIRC THRU TAIL AT 11,174. CIRC TO CLEAN UP TUBING BEFORE FRAC. RESET PACKER AT 10,990' (TUBING MEASUREMENTS) WITH 40,000 SET DOWN. CLOSED PIPE RAMS WITH 3.5" I.F. TOOL JT. DIRECTLY BELOW RAMS. PRESSURE UP TUB/CSG ANNULUS. TO 2600 PSI. NO LEAKS RIG UP HOWCO FRAC LINES. SAFETY MEETING AND PROCEDURES ON FRAC. JOB TESTING FRAC LINES AND REPAIRING LEAKS. ( TEST TO 11,000 PSI) SET PUMP KICK-OUT @ 10,400 PSI. PRESSURE ANNULUS TO 2600 PSI. PUMP. DATA FRAC AS FOLLOWS: STAGE I - 40 BBLS @ 15 BPM @ 9400 PSI. ISIP: 5510 PSI. MONITOR PRESSURE FALL-OFF TO 3500 PSI IN 20 MINUTES. STAGE 2 - 60 BBLS @ 15 BPM @ 8600 PSI. ISIP = 6609 PSI. MONITOR PRESSURE FALL-OFF TO 4000 PSI IN 30 MINUTES. STAGE 3 - 80 BBLS @ 15 BPM @ 8440 PSI. ISIP = 6800 PSI. MONITOR PRESSURE FALL-OFF TO 4500 PSI IN 50 MINUTES. STAGE 4 - 100 BBLS @ 20 BPM @ 9250 PSI. ISIP = 6975 PSI. MONITOR PRESSURE FALL-OFF TO 4625 PSI IN 95 MINUTES. STAGE 5 - RE-OPEN FRACTURE @ 0.8 BPM. SECURE WELL. BLOW DOWN LINES WITH AIR TO PREVENT FREEZING OVERNIGHT. FILL FRAC TKS. WITH 88 DEG. F. WATER. GEL FLUIDS FOR PROPPED FRACTURE STIMULATION. SLM/O30691A 1/6/91 1/7/91 HOWCO CONTINUING PREPARATION FOR FRAC JOB. SAFETY MEETING AND PROCEDURES ON FRAC JOB. PRESSURE TEST LINES TO 11,000 PSI. HAD SEVERAL LEAKS TO REPAIR. SET PUMP KICK OUT AT 10,400 PSI. PRESSURE UP BACK SIDE TO 2500. FRAC AS FOLLOWS: PUMP PAD STAGE AT 15 BPM AT PRESSURES FROM 8400 - 9000 PSI. AT 605 BBLS INTO PAD, ANNULUS PRESSURE TRANDUCER FAILED INDICATING TBG/CSG COMMUNICATION. JOB SHUT DOWN IMMEDIATELY. AFTER 6 MINUTES INVESTIGATION TO ENSURE CSG OK, ATTEMPTED TO CONTINUE JOB. COULDN'T MOVE X-LINKED FLUIDS IN TUBING. SD JOB. CLEAR SURFACE LINES AND PUMPS W/ FIW. BACKFLOW WELL TO MUD PITS AT MAXIMUM RATE (0.2 BPM) UNTIL RETURNS SHOWED A WEAK X-LINK. PUMP 1 MICRON FIW AT < I BPM @ 10,100 PSI TO MOVE X-LINKED GEL TO A TEMPERATURE GREATER THAN 120 DEGREES FOR BREAKER TO WORK. AT 40 BBLS, INJECTIVITY INCREASED SIGNIFICANTLY. FINAL RATE OF 1.9 BPM AT 9450 PSI. INJECTED TOTAL VOLUME OF 65 BBLS. HAD TO FREIGHT OUT MORE KCL FOR FRAC FLUIDS. TRANSFER UP 650 BBLS F.W. REHEAT AND REGEL. CLEAR ALL LINES WITH AIR. TREAT FRAC FLUIDS IN MUD PITS AND PILOT TEST BEFORE SHIPPING TO ONSHORE. HOWCO CONTINUE PREPARING FOR FRAC. SAFETY MEETING AND JOB PREPARATION. PRESSURE TEST AND REPAIR LEAKS ON FRAC LINES. TEST TO 11,000 PSI. RESET KICK-OUT AT 10,400 PSI. OPEN UP TO WELL. PRESSURE AT 1825 PSI. AFTER 18 HRS. SHUT IN. STARTED PUMPING PAD FOR THE SECOND TIME. AFTER PUMPING A TOTAL OF 250 BBLS AT 15 BBLS/MIN AND PRESSURES 8800/9500 THE FORMATION QUIT TAKING FLUID. PRESSURED ON UP TO 10,700 PSI WITH NO INJECTION. OPENED UP AND CLEARED HOWCO LINES TO MUD PITS. OPENED UP WELL HEAD TO MUD PITS AND FLOWING WELL WITH VALVES WIDE OPEN. GETTING BACK A VERY SMALL STREAM OF VERY THICK POLYMER FLUID. OPENED UP WELL AND DISPLACED WITH 10,000 PSI AND .2/.5 BPM. USING FILTERED INLET WATER. THE RATE GRADUALLY STARTED INCREASING AFTER PUMPING APPROX 20 BBLS. TO 3.5 BPM AT 9400 PSI. AT END OF PUMPING. PUMPED A TOTAL OF 65 BBLS. MOBILIZING EQUIP. AND MATERIAL TO ACID TREAT HR-HZ ZONE. RIG UP TO ACID TREAT. SAFETY MEETING AND PRESSURE TEST LINES TO 10,000 PSI. 1800 PSI ON TUB. AFTER 10 HRS CLOSED IN. PRESSURE UP BACK SIDE TO 2500 PSI. ACID TREAT AS FOLLOWS: ESTABLISH INJECTION OF 5 BPM AT 7850 PSI WITH I MICRON FIW. SWITCH TO 7-1/2% HCL AND PUMP 2000 GALS ACID AT AN AVG RATE OF 2.8 BPM @ 6660 PSI. DISPLACE ACID TO PERFS AT 4 BPM @ 6770 PSI. REDUCE RATE TO 2 BPM. PRESSURE GRADUALLY DECREASED FROM 6505 PSI TO 5161 PSI AS INJECTIVITY INCREASED DUE TO ACID REACTION. OVERDISPLACED ACID WITH 100 BBLS 1 MICRON FIW. TOTAL FLUSH VOLUME WAS 220 BBLS. LAST 70 BBLS OF FLUSH WAS PUMPED AT 4 BPM @ A FINAL PRESSURE OF 6626 PSI. CLOSE WELL IN. SLM/O30691A ]/8/9] ISIP 6000 PSI. PRESSURE DROPPED TO 3000 PSI IN 30 MINUTES. RIG DOWN HOWCO. BLED ANNULUS PRESSURE TO 0 PSI. TUBING SHUT IN PRESS. IS 1900 PSI AT 5:00 AM. START BLEEDING AT .25 BPM. STARTED FLOWING WELL BACK AFTER ACID TREATING HR-HZ W/2000 GAL. OF 7.5 % HCL AND LEAVING SHUT IN FOR 2 HRS. STARTING PRESSURE 1800 FLOW BACK AT .25 BPM AMD CONTINUE OPENING CHOKE TO MAINTAIN .25 BPM TILL PRESSURE BLEED OFF. LEFT CHOKE OPEN FLOWING BACK FOR 5 HRS THEN SHUT IN AFTER FLOWING BACK 53 BBLS. PH-7 AND NO H2S. SHUT IN FOR 1/2 HR. AND TUBING PRESSURE INCREASED TO 580 PSI. OPEN WELL BACK UP AND CONTINUE FLOW BACK OPERATIONS. FLOWED BACK A TOTAL OF 62 BBLS. PH STILL 7 AND NO H2S MEASURED. CLOSED WELL BACK IN AND PRESSURE INCREASED TO 480 PSI IN ONE HR. OPENED WELL BACK UP AND CONTINUED FLOW BACK FOR A TOTAL OF 74 BBLS. CLOSED WELL IN AND PRESSURE WAS UP TO 420 PSI AND STILL CLIMBING. OPENED WELL BACK UP AN CONTINUED FLOWING . PH 7 AND NO H2S CLOSED WELL BACK IN AND PRESSURE WAS UP TO 420 PSI THEN SEEMED TO STABALIZE. OPENED WELL UP AND FLOWED BACK TILL PRESSURE WAS OFF AND HAD A STEADY RATE OF 2 BPH. FLOWED BACK A TOTAL OF 88 BBLS. PH STILL 7 AND NO H2S READY TO UNSEAT PACKER AND CIRC IN 9.5 PPG NACL FIW. 1/9/91 WK AND RELEASE HOWCO RTTS AT 10,990. CAME FREE W\180,000 STRING WT. ( 210,000 ) HOOK LOAD. CIRC IN 9.5 PPG NACL FIW. LIMITED TO RATE OF CIRC DUE TO MIXING AND SHIPPING TO ONSHORE. AFTER CIRC APPROX 650 BBLS. THE PH OF CIRC FLUID DROPPED TO 5.75. FOR 15 BBLS. ADDED 18# CAUSTIC TO NEUTRALIZE ACID BEFORE SHIPPING TO ONSHORE. CIRC APPROX. 800 BBLS. BUT COULDN'T GET FLUID TO CLEAN UP. SHUT DOWN AND CHECK FOR FLOW. (OK) BUT WELL OUT OF BALANCE. MIX AND PUMP A LIGHT NACL PILL. T.O.H. WITH 7" HOWCO RTTS. FROM 11990. LAY DOWN SAME. PULL WEAR RING AND PRESSURE TEST HYDRILL 250/3500 PSI. TEST REST OF GATES, CHOKE MANIFOLD, CHOKE AND KILL LINES TO 250/5000 PSI. PERFORMED ACCUMULATOR TEST. INSTALL WEAR RING. PICK UP 7" 32# HOWCO MODEL N QUICK RETRIEVABLE BRIDGE PULG. WITH R.A. SUB ONE STD. ABOVE PACKER AND T.I.H.TO 11620 AND PICK BACK UP WITH PIPE IN TENTION AT 11613. RIG UP ATLAS W.L. CCL/GR TO CORRELATE DEPTH. 1/10/91 R.I.H. W/ ATLAS W.L. CCL/GR AND CORRELATE TBING DPTH W/DIL LOG. TUBING DEPTH WAS SHOWING 10 FT. DEEPER THAN ACTUAL LOG DEPTH. POOH AND RIG DOWN W.L. (WILL NEED TO RUN TUBING 10 DEEPER ON SETS) SET HOWCO 7"MODEL N QUICK RET.BRIDGE PLUG AT 11660 FT. TEST TO 3000 OK. PUMP 258# PROPPANT DOWN TUBING TO 11300 AND LET SETTLE TO COVER B.P. WAIT ON SAND TO SETTLE. LOWERED TUBING TO FIND T.O. SAND.(NO SAND YET). WAIT ON SAND TO SETTLE. FEEL FOR AND HAD 5 FT. SAND ABOVE BRIDGE PLUG. PICK UP 10 FT. ABOVE THE SAND AND CIRC 3 TUBING VOLUMES (300 BBLS.) 9.6 PPG 1MFIW AT 7.7 BPM. HAD TO STOP ONCE AND BUILD VOL. POOH AND LAY DOWN HOWCO BRIDGE PLUG SETTING TOOL. PULL DRILLING FLOW NIPPLE FROM HYDRILL AND INSTALL ATLAS 5000 SLM/O30691A PSI 40 FT. LUBRICATOR AND PRESSURE TEST TO 3000 PSI. PERFORATE AS FOLLOWS: WITH 3-3/8" SEQUENTIAL OMNIKONE HOLLOW CARRIER 30~ GUNS LOADED 3 JSPF W/17 GRAM CHARGES AT 60 Deg. PHASING. (PER PROGNOSIS) HAD SAFETY MEETING BEFORE PICKING UP FIRST GUN, AND SHUT DOWN COMMUNICATION SYSTEM. R.I.H. AND FOUND TOP OF SAND AT 11653 RUN # I PERF. 11620/11640 -- 20 FT. 60 HOLES RUN # 2 PERF. 11600/11620 -- 20 FT. 60 HOLES RUN # 3 PERF. 11576/11600 -- 24 FT. 72 HOLES * LEFT 29 FT. OF 3 3/8" OD TUBLAR GUN IN HOLE AFTER THIRD RUN. TOP OF FISH AT 11624. RUNNING IN HOLE WITH RUN # 4 AT 5 A:M NOTE: AFTER SHOOTING THE FIRST RUN WELL STARTED TAKING FLUID. IT TOOK 7 BBLS TO FILL THE HOLE AFTER THIRD RUN. 1/11/91 CONTINUE PERFORATING AS FOLLOWS: RUN # 4 PERF. 11554/11572 18 FT. 54 HOLES FLUID LEVEL WAS 15 FT. BELOW R.T. AFTER RUN # 4 RUN # 5 PERF. 11520/11542 22 FT. 66 HOLES. ALL SHOTS FIRED ON GUNS THAT MADE IT BACK TO SURFACE. RIG OUT ATLAS W.L. UNIT. LAY DOWN 7" LUB. AND CHANGE OUT DRILLING NIPPLE ON TOP OF HYDRIL. SLIP AND CUT DRILLING LINE. PICK UP AND MAKE UP TRI-STATE SKIRTED 2-5/8" SPEAR WITH 4-3/4" BUMPER SUB. T.I.H. WITH FISHING TOOLS. HAD TO WORK PAST LINER TOP AT 8989 FT. (97 STDS + SINGLE + 16.35" FISHING TOOLS. WORK OVER FISH. 11624 W.L.M POOH AND LAY DOWN FISH. ALL SHOTS FIRED. PICK UP HOWCO 7" 32# RTTS PACKER AND T.I.H. WITH FOLLOWING BHA. MULE SHOE, 180 FT. 3.5" TUBING, 3.5 x 2-7/8" X-OVER, 7" 32# RTTS PACKER, 3.5 X 2 7/8" X-OVER, 11,000 FT.(+-) 3.5" 9.3# AB MODIFIED 9.3# L-80 TUBING, 3.5" EUE 8 RD. X 3.5" IF X-OVER, 3.5" 13.3# S-135 IF PUP JOINT. THIS JT. WILL BE SPACED OUT PER PROG AFTER HOLE IS CIRC CLEAN. CIRC AND FILTERING 9.5 PPG 1MFIW AT 5 AT 5:11000 FT. 1/12/91 CIRC AND CLEAN UP HOLE BEFORE FRAC JOB USING 9.5 PPG 1MFIW. SET HOWCO 7"RTTS PACKER AT 11,000 WITH TAIL AT 11180 FT. SPACED OUT WITH PIPE RAMS CLOSED ON 3.5" S-135 D.P. AND 40,000 SET DOWN ON PACKER. PRESSURE TEST BACK SIDE TO 2900 PSI. ALL OK CONTINUE TO PREPARE FOR FRAC JOB. HAD SAFETY MEETING AND JOB PROCEDURES. CIRC WARM WATER THUR FRAC LINES AND PRESSURE TEST TO 6000/11,000 PSI. SET PUMP KICK OUT SWITCH AT 10,400 PSI. DATA FRAC AS FOLLOWS: STAGE I DISPLACE 9.5 PPG FILTERED BRINE WITH 100 BBLS. SLICK WATER GEL AT 15 BPM. AT 8500/8800 PSI. ISIP: 6150 PSI. PRESSURE FELL OFF TO 2915 PSI IN 11 MIN. STAGE 2 ATTEMPT TO RE-OPEN FRACTURE AT 1.5 BPM BUT UNSUCCESSFUL. INCREASED RATE TO 3 BPM TO RE-OPEN FRACTURE. SHUT DOWN AFTER PUMPING 15 BBLS. FINAL PRESSURE 5200. SLM/O30691A PRESSURE FELL OFF TO 2930 PSI. IN 5 MIN. STAGE 3 RE-OPEN FRACTURE AT 3.4 BPM. SHUT DOWN AFTER PUMPING 15 BBLS. FINAL PRESSURE 5850. FELL OFF TO 2870 IN 6 MIN TRANSFER 300 BBLS. HEATED FRESH WATER TO HOWCO MIX TK. MIX HYBOR 1400 GEL IN 2% KCL AND PREPARE TO FRAC. FRAC TREAT AS FOLLOWS: DIRTY STAGE RATE(BPM) PRESSURE VOLUME(BBL) PAD 15 9500 772 2# 14 9350 35 4# 14 9025 53 6# 14 8280 62 8# 14 8100 98 * FLUSH ** 14 9000 114 SD PUMPS. ISIP = 7530 PSI. SECURE WELL. MONITOR FALL-OFF PRESSURE. TOTAL PROPPANT PUMPED THROUGH PERFORATIONS WAS 50,400 LBS CARBOPROP HC TOTAL LOAD TO RECOVER IS 1210 BBLS. * 8# STAGE WAS CUT SHORT 30 BBLS SHORT OF RECOMMENDED DIRTY VOLUME BECAUSE FROZEN PROPPANT WAS RESTRICTING ADDITION TO THE SAND SCREWS. ** FIRST 16 BBLS OF FLUSH HAD 2+ PPG PROPPANT. FLUSH LINES AND EXCESS GEL TO MUD PIT FOR TREATING PRIOR TO SENDING TO PRODUCTION. RIG DOWN HOWCO. PRESSURE BLED TO 4200 PSI IN 3 HOURS. OPENED UP CHOKE WITH 3520 PSI. AT 10:45 PM ( 4-3/4 HRS AFTER ISIP) FLOWED BACK AT 1/4 BBL HR. RATE. AFTER FLOWING 1BBL THE WELL HEAD PRESSURE WAS AT ZERO. USING THE BOPE TEST PUMP, PRESSURED UP TUBING. THE PRESSURE STABALIZED AT 3200 PSI. CLOSED WELL IN AND MONITOR PSI. THE PRESSURE WAS 1840 PSI. AT 5 A:M 1/13/91 WELL CLOSED IN WITH 1840 PSI AT 5:AM AND THE PRESSURE CONTINUED TO DROP TO 1820 PSI AT 7:00 AM OPENED CHOKE WITH 1/4 BPM FLOW TO PIT AT 7:00 AM. THE PRESSURE DROPPED AS FOLLOWS: TIME PRESSURE TTL RETURN BBLS 7:00 AM 1820 PSI 7:10 AM 650 PSI 7:30 AM 850 PSI 8:00 AM 900 PSI 8:30 AM 650 PSI 9:00 AM ZERO 10:00 AM 320 PSI 12: O0 NOON 300 PSI PLUGGED OFF STARTED COMING BACK A LITTLE BETTER. OPND CHOKE GRAD WELL HAD FLOWED BACK A TOTAL OF ONLY 21.8 BBLS BY NOON. THEN STARTED INCREASING FLOW. FLOWED BACK 21.7 BBLS IN ONE HR. TILL 1:00 SLM/O30691A PM (A TOTAL OF 43.5 BBLS) THEN FLOWED AT APPROX 8 BBLS. HR. TILL 3:30 PM. SLOWED TO APPROX 5 BPH. AND STARTED GETTING THICK GLOBS IN RETURNS. AT 6:00 PM (24 HRS. AFTER FRAC) HAD A TOTAL OF 82.2 BBLS IN PITS. CONTINUED TO FLOW WELL BUT WAS AFRAID TO SHUT IN FOR PRESSURE BUILD UP IN THE TUBING DUE TO THICK FLUIDS. FLOWED BACK A TOTAL OF 135.2 BBLS AT 5:00 AM WITH A LITTLE DIESEL AND OIL IN FRAC FLUID. STILL BIG GLOBS OF POLYMER AT TIMES. 1/14/91 CONTINUE FLOWING BACK AT APPROX 5 BBLS HR. CLOSED WELL IN AND HAD STEADY BUILD UP TO 375 PSI IN ONE HR. OPEN WELL BACK UP AND CONTINUE FLOWING BACK. WITH CHOKE FULL OPEN. WE WERE GETTING ABOUT 4 BBLS HR. RATE TO PITS. AND STARTED GETTING ABOUT 10 % OIL IN SAMPLES. HAD FLOWED BACK A TOTAL OF 161 BBLS FLUID. CLOSED WELL IN AND PRESSURE INCREASED TO 490 PSI IN 3.5 HRS. OPENED WELL BACK UP TO CONTINUE FLOWING BUT STARTED GETTING TOO MUCH OIL AND GAS TO MUD PITS (FLOWED APPROX 2 BBLS. MOSTLY OIL) AFTER BEING CLOSED IN. OPENED UP CIRC SLEEVE ON RTTS AT 11,000 FT. RIG UP THRU CHOKE MANIFOLD AND RE-VERSE CIRC 116 BBLS. THROUGH PRODUCTION SEPERATOR UNTIL WE GOT 9.5 PPG. NACL RETURNS. CLOSED WELL IN FOR PRESSURE BUILD UP. CHECK FOR ONE HR.AND NO BUILD UP REVERSE CIRC. (THRU RTTS CIRC SLEEVE AT 11,000 FT.) CIRC. WITH 9.5 PPG 1M FILTERED NACL WATER CLEANING UP WELL BORE. BUILDING MORE CIRCULATING VOLUME AND CIRC. THRU FILTERS AS REQUIRED. A LITTLE OIL PLUGS THE SOCK FILTERS VERY QUICKLY. PUMPING IN LESS THAN 12 NTU TILL RETURNS GOT BELOW 40 NTU. CHECK FOR FLOW. ( NO FLOW ) CLOSED CIRC VALVE AND UNSET PACKER. RE-VERSE CIRC AROUND TAIL AT 11180 CLEANING UP HOLE AS ABOVE. FINISHED CIRC AT 5:00 AM AND READY TO FEEL FOR SAND. 1/15/91 FINISHED REVERSE CIRC. AND TRIP ON IN FROM 11,180 FEELING FOR SAND. FOUND TOP OF SAND AT 11,455 FT. (35 FT. HIGH.) RIG UP AND REVERSE CIRC OUT SAND TO 11,490 FT. (DIL-LOG MEASUREMENTS). PRESSURE UP TO PACK SAND AND PRESSURE TEST PLUG. PRESSURED UP TO 3000 PSI. PRESSURE HAD DROPPED 500 PSI IN ONE MINUTE. DROPPED 800 PSI IN TWO MIN. DROPPED 1050 PSI IN THREE MIN. RELEASE PRESSURE AND OPENED UP RAMS. RIG DOWN CIRC. LINES PUMP PILL AND POOH AND LAY DOWN HOWCO RTTS PACKER FUNCTION BLIND RAMS. PICK UP HOWCO 7" 32# MODEL-N- QUICK RETRIEVABLE B.P. AND T.I.H. SET B.P. WITH TOP AT 11478 FT. RIG UP AND TEST B.P. WITH 3000 PSI. NO LOSS IN PRESSURE IN 15 MIN. SPOT 15 GAL 20-40 CARBO FRAC ON TOP OF PACKER. LET SAND SETTLE ONE HR. THEN RUN IN AND TAG SAND AT 11,466 FT. REVERSE CIRC OUT EXCESS SAND. LEFT 5 FT. ABOVE B.P. TO 11,472. CLEANING PITS AND RE-VERSE CIRC OUT 9.5 PPG NACL WITH 8.5 PPG 1MFIW. SHIPPING THE 9.5 PPG NACL TO ONSHORE. SLM/O30691A 1/16/91 CONTINUE REVERSE CIRC. 1MFIW CLEANING UP WELL BORE. THE NTU HAD CLEANED UP TO BELOW 40 AFTER CIRC 1190 BBLS. JUST AS WE WERE READY TO QUIT PUMPING, WE GOT ABOUT 25 GAL 20-40 CARBO PROP. OVER SHAKERS. CLOSE WELL IN AND PRESSURE TEST B.P. WAS ABLE TO PUMP PAST B.P. AT 2800 PSI. SHUT DOWN PUMP AND LOST 350 PSI. IN ONE MIN. LOST 600 PSI IN 2 MIN. WORKING TUBING AND HOWCO RETREVING TOOL TRYING TO RE-SET B.P. RE-VERSE CIRC ON TOP OF B.P. PICK UP KELLY AND WORK OVER B.P. WAS ABLE TO UN-SET PULL FREE. RESET WITH TOP OF PACKER AT 11478 FT. PRESSURE TEST TO 3000 PSI FOR 30 MIN. NO LEAK OFF. FEEL FOR AND REVERSE CIRCULATE EXCESS SAND FROM 11,473 FT. LEAVING 5 FT. OVER B.P. MEASUREMENTS SHOULD CORRESPOND TO DIL LOG. WHILE REVERSING OUT SAND THEIR WAS A LOT OF GAS BREAKING OUT. CHECKED THE BACK SIDE AND HAD A 1.5 BBL/MIN. FLOW INDICATING GAS EXPANSION. CIRC DOWN TUBING AND CIRC BTM. UP. THEN SPOT 15 GAL OF 20-40 C.P. HAD 70,80 NTU COMING OUT AND GOING IN FIRST 30 MIN THEN HAD ABOUT 50 NTU WHILE CIRC THE REST OF CSG. VOLUME. CIRC ADDITIONAL 300 BBLS OF NEW 1MFIW AND SPOT ON BTM. CHECK FOR FLOW. FOUND WELL FLOWING AGAIN AT ABOUT (2 BBLS HR) PRESSURE TEST CSG. BACK TO 3000 PSI AND FOUND B.P. LEAKING AGAIN. CLOSED WELL IN WHILE REPAIRING VALVE ON PIT. PRESSURE BUILD UP TO 390 PSI. MAKE A FULL CIRCULATION THEN CLOSE WELL IN FOR 30 MIN. AND GOT A SHUT IN PRESSURE OF 390 PSI ON TUBING AND 370 ON ANNULUS GAGE. WEIGHTING UP 8.5 PPG FIW TO 9.5 NACL. 1/17/91 RECEIVED THE REMAINDER OF SALT NECESSARY TO RAISE WT. AT 11 AM. RAISE WT. TO 9.5 PPG ON REMAINING VOLUME. CIRC IN AND KILL WELL. CHECK FOR FLOW. (NO FLOW.) REVERSE CIRC OUT SAND ON TOP OF HOWCO B.P. LATCH ON TO B.P. AND PULL FREE. POOH AND LAY DOWN HOWCO 7" 32# BRIDGE PLUG. FUNCTION BLIND RAMS. PICK UP HOWCO MODEL 3L PACKER TYPE RETRIEVABLE B.P. R.I.H. SETTING B.P. AT 5:00 AM 1/18/91 SET BRIDGE PLUG @ 11,497' (DRILLERS DEPTH). - ATTEMPT TO TEST TO 3000 PSI. - NO TEST - UNSET PLUG & LAY DOWN PUP JT. - RE-SET BP @ 11,482'. TEST PLUG TO 3000 PSI FOR 30 ~IN. W/ 9.5 PPG. BRI,E. - 800D .~ST. RUHR PILL & POUR 15 ~^L. SAND gO~N TUBING. - DISPLACE TO ,~OTTOH. LET SAND SETTLE. TAG SAND @ 11,479'. - TEST TO 3000 PSI. ~UHP 9.5 FLUID FROH PITS TO PRODUCTION. - FILL PITS ~/ FILTERED ~I~. DISPLACE 9.5 PPG ~/ 8.5 PPG FILTERED FI~. PUHPED ~33 BBLS 9.5 ~G TO ONSHORE. CHECK FLO~ & CLEAN PILL PIT. _~iRC. 300 BBL. @ 7 BBL/HIN. - CHECK FLUID N~U'S. ~HECK FLO~ - BLO~ DO~N LINES. TOOH ~/ 3 1/2 TUBING & HO~CO ~VERSHOT. CHANGE RAHS TO 2 7/8". TEST BOPS & RELATED EquIP. ~ SLM/O30691A 1/19/91 FINISH UP BOP TEST. RIG UP & RUN 2 7/8" 6.5# L-80 EUE COMPLETION STRING. STRAP & DRIFT EACH STAND. CHECK EACH CONN. FOR PROPER TORQUE. MAKE UP TUBING HANGER & CONTROL LINE. - R/U SHELL SLICKLINE & PULL DUMMY BALL VALVE @ 300'. RIH W/ SLICKLINE & TAG XN NIPPLE @ 10,692'. (DEPTH VERIFICATION) PUMP THROUGH CONTROL LINE TO INSURE NO OBSTRUCTION. - ATTEMPT TO LAND TUBING HANGER IN AP SPOOL. - DID NOT LAND PROPERLY - PULL LOCK DOWN & VISUALLY CHECK LOCATION OF HANGER. - CHANGE OUT TUBING HANGERS. NOTE; 1ST TUBING HANGER WAS FOR C13A-23. THIS WELL HAS A F SPOOL,(MODIFIED) AND TAKES SHORTER TUBING HANGER. SET PACKER W/ 2500 PSI DOWN TUBING. R/U SLICKLINE. - TEST LUBRICATOR TO 1500 PSI. - RIH & PULL PLUG OUT OF XN NIPPLE. NOTE; WIRELINE OPERATOR REPORTED XN NIPPLE @ 11,063'. (79' DEEPER) WILL CHECK DEPTH W/ ATLAS WIRELINE WHEN WE RUN PERF. GUNS. R/U AND PUMP DOWN TUBING & MONITOR ANNULUS TO INSURE PACKER SET. INSTALL BPV & NIPPLE DOWN BOP'S. 1/20/91 NIPPLE DOWN BOP'S. INSTALL TREE & TEST TO 5000 PSI. PULL MOUSEHOLE & INSTALL PRODUCTION FLOW & CONTROL LINES. R/U SHELL SLICKLINE & TEST LUBRICATOR TO 1500 PSI. RIH W/ SHIFTING TOOL & OPEN SLIDING SLEEVE @ 11,004' WLM. - POOH RIH W/ 2 1/8" DUMMY PERF. GUN TO 11,100' WLM. - POOH GAS LIFT WELL - STARTED @ 1800 HRS., 1-19-91 - HAD 281 BBL. OUT @ 0430 HRS., 1-20-91 1/21/91 GAS LIFT WELL FOR UNDERBAL. PERF. (UNLOADED APPROX. 430 BBL. WAS DOWN TO 3 BBL/HR. - DECIDED TO CLOSE SLEEVE & PERF.) R/U SHELL SLICKLINE & TEST LUBRICATOR TO 1500 PSI. RIH W/ SHIFTING TOOL & CLOSE SLEEVE. - POOH. - (FLUID LEVEL @ 6670') (FLUID LEVEL @ 6670' WOULD BE APPROX. 1800 PSI ON FORMATION @ BOTTOM PERF.) R/U ATLAS WIRELINE & TEST LUBRICATOR TO 1500 PSI. RIH W/ PERF. GUN #1 (2 1/8" ROUND NOSE SILVER JET STRIP GUN W/ 4JSPF) CORRELATE DEPTH - (TUBING TAIL @ 11,067' SBT MEASUREMENT) PERFORATE FROM 11,434' TO 11,460'. - POOH. RIH W/ GUN #2 - CORRELATE DEPTH - PERF. FROM 11,409' - 11,434'. POOH. RIH W/ GUN #3 1/22/91 CORRELATE DEPTH & PERF. FROM 11,386' TO 11,409' - POOH W/ATLAS W/L. R/U SHELL SLICKLINE & TEST LUBRICATOR TO i500 PSI. RIH TO PULL GLV #4 @ 6983' (WLM). - COULD NOT PULL VALVE DUE TO DEBRIS IN TUBING FROM PERF. GUNS. - POOH - TOOL HUNG UP @ 4440' - JAR FREE - POOH. FLOW WELL SHUT WELL IN. - R/U SLICKLINE & TEST LUBRICATOR TO 1500 PSI. - RIH & PULL GLM #5 @ 7977' (WLM). - POOH. RIH W/ MERLA "T" KICKOVER TOOL & DUMMY GLV. - COULD NOT SET @ 7977'. POOH. RIH W/ "N" KICKOVER TOOL & DUMMY GLV. - SET DUMMY VALVE IN GLM #5 @ 7977' (WLM). - POOH. RIH W/ OTIS BXE 2.313" BALL VALVE & SET 304'. - PRESSURE SLM/O30691A CONTROL LINE TO 3000 PSI. - POOH - R/D SLICKLINE. NOTE; RIG RELEASED TO C13A-23 @ 2400 HRS, 1-21-91. NOTE; 348 JTS. 2 7/8" 6.5# TUBING IN WELL. 2/4/91 HK-HN ACID STIMULATION FILL ANNULUS WITH FIW. APPROX 656 BBLS. (1-3 MICRON CARTRIDGE FILTER WATER) RIG UP SLICKLINE AND TEST LUBRICATOR TO 1500 PSI. RIH AND CLOSE XD SLEEVE. POOH AND RIG DOWN SLICKLINE UNIT. RIG UP HOWCO TO ACID TREAT. FLUSH BOTH PUMP UNIT TKS. AND LINES WITH FIW. HAD SAFETY MEETING WITH MORING TOUR CREW. PRESSURE TESTING AND REPAIRING LEAKS. HAD SAFETY MEETING WITH DAYLIGHT CREW. RE-PRESSURE TEST LINES. TOOK INJECTION RATE AT .21BPM AT 4300 PSI. REPAIR ANOTHER LEAK RIGHT ABOVE TREE. MIX UP AND PUMP 1000 GAL OF 7.5% HCL PREFLUSH. WITH 3 GAL OF HAI-85 INHIBITOR. 50# CITRIC ACID, PLUS 2 GAL SURFACTANT. 213 GAL 20 BE HCL. FOLLOWED BY 500 GAL 7.5/1.5% HCL/HF MUD ACID. WITH 1.5 GAL HA1-85 25# CITRIC ACID, 130 GAL 20 BE HCL ACID, 200# ABF AND 1 GAL LO-SURF 300. REPAIR UNION LEAK AT END OF THIS BATCH. FOLLOWED BY 1000 GAL AMMONIUM CHLORIDE FLUSH. STARTED PUMPING ACID AT 6:15 PM. 2/3/91 AVERAGED ABOUT .16 BPM AT 4600 PSI. AFTER ACID REACHED BTM. RATE INCREASED TO 1 BPM AT 3400 PSI DISPLACED WITH TOTAL OF 81 BBLS FIW. ACID IN PLACE AT 2:45 AM ISIP 3345 FALL OFF EACH MIN FOR 15 MIN AS FOLLOWS. I MIN 2695 PSI 6 MIN -1959 PSI 11MIN - 1672 2 MIN 2443 7 MIN -1890 12 MIN - 1627 3 MIN 2266 8 MIN -1824 13 MIN - 1586 4 MIN 2138 9 MIN -1767 14 MIN - 1550 5 MIN 2042 10 MIN -1721 15 MIN - 1521 RIG OUT HOWCO. OPEN WELL UP WITH 950 T.PSI AT 3:35 AM AND STARTED FLOW BACK AND GAS LIFT. 2/12/91 MOVE RIG FROM C11-23. RIG UP SHELL W.L. UNIT AND PRESS. TEST LUBRICATOR TO 2000 PSI. RIH WITH HOWCO MEMORY RECORDER (HMR) AND SET IN THE X-N NIPPLE AT 11,050 FT. (W.L.M.) WITH WELL FLOWING. ._o THE WELL DIED DURING TEST FOR LACK OF INJ. GAS. THE INJ. RATE .m WAS INCREASED AND THE WELL CAME BACK ON. AFTER PRODUCTION ~ STABILIZED THE W.L. TOOLS WERE RAN AND THE DOWN HOLE TOOLS SHUT ~ IN FOR PRESSURE BUILD UP. POOH AND RIG DOWN W.L. UNIT. ~ ~ RELEASE RIG AT 3'00 PM 2-12-91 ~/~/91 MOVE RIG FROM C 13-A-23 STARTING AT 12 MIDNIGHT 2/14/91 RIG UP SHELL W.L. UNIT AND TEST BOP TO 2000 PSI. RIH WITH SHUT OFF RECOVERY TOOL AND PULL HOWCO MEMERY RECORDER. POOH AND RIG DOWN SHELL W.L. UNIT. STARTED GAS LIFTING AT 3:30 AM 2/14/91. RIG UP DRESSER ATLAS W.L. UNIT AND PRESSURE TEST WHILE GAS LIFTING WELL. PREPARING TO PERFORATE THE HE-HF. TOTAL OF 5 HRS. TO 5 AM REPORT SLM/O30691A 2/15/91 FINISH RIGGING UP ATLAS WIRELINE UNIT. - TEST LUBR TO 1500 PSI WHILE GAS LIFTING WELL. - RIH W/ 2 1/8" SILVER JET DECENTRALIZED PERF. GUN. (32~ OF SHOT, 4 JSPF) - COULD NOT CORRELATE DEPTH FROM 7" PUPS OR CASING COLLARS. - POOH - PICK UP GAMMA RAY & COLLAR LOCATOR W/ PERF. ASSM. - RIH & CORRELATE DEPTH. - SHOOT - PERF. FROM 11,186~ TO 11,218~ POOH W/ ATLAS WIRELINE & RIG DOWN SAME. - FLOW WELL & PREPARE TO MOVE. NOTE; RIG RELEASED FROM C22A-26 @ MIDNIGHT 1-14-91. WILL MOVE TO Cll-23. SLM/O30691A 031491 RELEASED RIG FROM Cll-23 AT 6:AM THEIR WILL BE 23 HRS. ON FIRST DAY FOR COST PREVIOUS TO RIG MOVE, RIG UP SHELL SLICK LINE UNIT AND LUBRICATER. TEST LUB. TO 1500 PSI. R.I.H. & SHIFT SLIDING SLEEVE AT 11,002 FT. POOH AND RIG OUT W.L. UNIT. NO SSSV TO RETRIEVE. MOVE RIG OVER HOLE. RIG UP LINES TO CIRC. INJECT APPROX 450 BBLS DOWN BACK SIDE AND UP TUBING. HAD 420 PSI ON CSG. AND 165 ON TUBING. AFTER CLOSING IN FOR ONE HR. RIG UP INJECTION LINE DOWN TUBING AND UP CSG. CIRC OUT EST CSG. VOLUME.(650 BBLS.) 3MFIW. HOOKING UP 4" AND 6" CHOKE LINES WHILE CIRC WELL. HOOK UP FLOW LINE AND INSTALL HAND RAILS. CLEANING MUD PITS. CHANGE OUT 7" LINERS TO 5.5" AND CLEAN SUCTION LINES. CLOSED WELL IN AND CHECKED PRESSURES. STILL HEADING A LITTLE GAS. OPEN BACK UP TO INJECTION LINE AND WILL CIRC ANOTHER HR. INSTALL MOUSE HOLE. PICKING UP 3.5" EUE 8 RD. 9.3# WORK STRING WHILE CIRC. WELL. CLOSE WELL IN FOR ONE HR. PRESSURE DOWN. BLEED OFF A LITTLE GAS & INSTALLED DOUBLE CHECK IN TUBING HANGER. RIG DOWN PRODUCTION LINES AND REMOVED TREE. PICK UP AND INSTALL RISER. INSTALL BOPE. WELDER HAD TO MODIFY CHOKE LINE. READY TO START TESTING BOP AT APPROX 5:00 AM NOTE: TUBING THDS. WORE TO MUCH TO GET TORQUE VALUES PROPERLY. THE THDS. BURY TO DEEP. USING 2" PAINT BRUSH FOR DOPE BRUSH. 031591 RIG UP & WELD 3" CHOKE LINE. TEST BOPS & RELATED EQUIP. - HYDRIL TO 250/2500 PSI - BOPS & RELATED SURFACE EQUIP. TO 250/5000 PSI. INSTALL TUBING BELLY BOARD IN DERRICK. STRAP, DRIFT, & PICK UP 3.5" 9.3# TUBING. MAKE UP LANDING JT. W/ SAFETY VALVE. - PULL BACK PRESSURE VALVE. - SCREW IN LANDING JT. - BACK OUT TUBING HANGER LOCK DOWN PINS. ATTEMPT TO PULL TUBING HANGER OUT OF TUBING SPOOL, WOULD NOT MOVE. - FILL TUBING & BACK SIDE. - PRESSURE TUBING & ANNULUS TO 1050 PSI & WORK TUBING, NO LUCK. NOTE; JARS & DRILL COLLARS TO BE ON PLATFORM @ APPROX. 0830 HRS. 3-15-91. 031691 ATTEMPT TO WORK TBG. HANGER FREE. - W.O. BOAT W/ DC~S & JARS. OFF LOAD BOAT. - PICK UP XO, JARS, & (3) 6 1/4" DC~S. - JAR UP ON HANGER. (HARD TO GET GOOD HIT, DUE TO NO STRETCH) - PRESSURE ANNULUS TO 800 PSI & WORK JARS. - CAME FREE. - LAY DOWN JARS & DC~S PICK UP LANDING JT. WORK TUBING PULLING 165,000 TO RELEASE BAKER PACKER. - WOULD NOT RELEASE. - PULL 174,000 (100% TENSILE STRENGTH) & PACKER CAME FREE. NOTE; BLOCKS ARE 30,000 CIRC. - SENT OILY WATER TO PRODUCTION. - SLOW DUE TO PRODUCTION CAN ONLY TAKE 2 BBL/MIN. NOTE; HAD ALOT OF GAS TO CIRC. OUT. LOWER PERF WAS AT 11,460~ AND WE ARE CIRCULATING UP AT 11,005~. HAD TO LET GAS MIGRATE UP TO 11,005~. POOH & LAY DOWN COMPLETION TOOLS. PICK UP MULE BIT & SCRAPER - TIH. 031791 TIH W/ MULE BIT & SCRAPER. - TAG BOTTOM @ 11,472~. POOH W/ SCRAPER. PICK UP HOWCO BP OVERSHOT & TIH TO 11,472'. REVERSE CIRC. PERF. GUN DEBRIS & SAND FROM 11,472' TO 11,482'. NOTE; 3" TO 2" CIRC. SWEDGE ON TOP OF TUBING & 2" TO 3" SWEDGE AT END OF CHOKE MANIFOLD KEPT PLUGGING W/ PERF. GUN DEBRIS. LATCH ON TO BRIDGE PLUG & PULL LOOSE W/ 195,000. - ATTEMPT TO CIRC. CONVENTIONALLY. - STARTED TO PRESSURE UP. - REV. CIRC. BOTTOMS UP. POOH W/ HOWCO RETR. BRIDGE PLUG. NOTE; HOLE TAKING APPROX. 4 BBL/HR. 031891 LAY DOWN RETR. BRIDGE PLUG. TIH W/ MULE SHOE. - TAG SAND @ 11,539' REV. CIRC. BOTTOMS UP. - CLEAN PITS & ~UMP WASTE WATER TO PRODUCTION @ 2 BBL./MIN. - SLIP & CUT DRLG. LINE. DISPLACE HOLE W/ FIL. FIW PUMPING RETURNS TO PRODUCTION @ 2 BBL/MIN. CIRC. & BUILD MUD WT. TO 9.5 #/GAL. (275 BBL. TO CIRC. BEFORE HAVING 9.5 fi/GAL. ALL AROUND @ REPORT TIME) NOTE; HOLE TAKING 2 BBL/HR. NOTE; LARRY WIEBENGA (ATLAS WIRELINE PERSONNEL) CUT RIGHT EAR WHEN HE WAS EXITING HELICOPTER. (1 ST AID) ACCIDENT REPORT TO FOLLOW. 031991 CIRC. & BUILD MUD WT. TO 9.5 #/GAL. (ALL FLUIDS CIRC. THRU SUN DRLG. FILTERING SYSTEM BEFORE GOING DOWN HOLE, COULD ONLY CIRC. AT 2 BBL/MIN DUE TO PLUGGING FILTERS) - MIX & PUMP XC POLYMER PILL (DID NOT SEE ANYTHING COME BACK W/ PILL) POOH W/ MULE SHOE. N/D FLOW NIPPLE & LINES. - INSTALL SHOOTING FLANGE & 7" RISER. - R/U ATLAS WIRELINE LUBRICATOR & TEST TO 1500 PSI. RIH W/ GUN #1 - TAG SAND W/ GUNS @ 11,520' WL (11,539' DRILLERS) - TIE IN DEPTH W/ SBL. - SHOOT PERF. #1 FROM 11,356' - 11,370' - POOH RIH W/ SHOT #2 - SHOOT PERF. #2 FROM 11,464' - 11,472' & 11,306' - 11,322' - POOH - RIH W/ SHOT #3 - SHOOT PERF. #3 FROM 11,160' - 11,173 & 11,336' - 11,348'. POOH - RIH W/ SHOT #4. NOTE; WHILE RIGGING UP LOGGERS HOLE WAS TAKING APPROX. 1 BBL/HR. FROM TIME WE STARTED PERF. TO REPORT TIME, HOLE IS TAKING APPROX. 3 BBL/HR. 032091 SHOOT PERF: #4 !1,274': ~1,298'. - POOH - RIH W/ SHOT #5 - SHOOT PERF. #5 11,186 - 11,218 . POOH - RIM W/ SHOT #6 - SHOOT PERF. #6 11,076' - 11,104'. - POOH. RIG DOWN ATLAS WIRELINE, LUBRICATOR, & SHOOTING FLANGE. - N/U PITCHER NIPPLE. LAY DOWN (1) STD. 6 1/2" DC'S OUT OF DRK. TIH W/ BIT & SCRAPER. - TAG BOTTOM @ 11,539'. REV. CIRC. BOTTOMS UP. CIRC. LONG WAY & FILTER FLUIDS. HOLE OUT OF BALANCE. FLOW INTO TRIP TANK IN ATTEMPT TO BALANCE OUT. NO LUCK - MIX & PUMP PILL. TOOH W/ BIT & SCRAPER. MAKE UP BRIDGE PLUG, RTTS, CIRC. SUB, & RA MARKER. - TIH. NOTE; WHILE CIRCULATING CONVENTIONALY & FILTERING FLUID WE LOST APPR. 100 BBL OF FLUID. CHECKED ALL AREAS FOR SURFACE LEAKS, NONE. (CIRCULATING @ 1 BBL/MIN ) SHUT DOWN CIRCULATING & MONITOR WELL THROUGH TRIP TANK, HOLE TAKING 1 BBL/HR.??? TRIP OUT OF HOLE, WELL TAKING 4 BBL/HR. 032191 TIH W/ HOWCO RETR. BRIDGE PLUG, RTTS, & CIRC. SUB. - TAG BOTTOM @ 11,539', DRILLERS DEPTH; DIL IS 11520', 19' LESS THAN DRILLERS DEPTH. R/U HOWCO LINES. PUMP DIRTY FLUID IN PITS (85 NTU) TO PRODUCTION & CLEAN PITS. - FILL PIT W/ 150 BBL OF FIW. - WT. FLUID TO 9.5 #/GAL. & FILTER THROUGH SUN UNIT. SET RETR. BP @ 11,430~. (ALL TOOL DEPTHS ARE DRILLLRS DEPTHS.) HELD SAFETY MEETING W/ ALL PERSONNEL INVOLVED IN ACID JOB. - RIG UP HOWCO LINE TO TUBING. - FLUSH & TEST LINES TO 8000 PSI. ATTEMPT TO TEST BRIDGE PLUG. - KEPT GETTING RETURNS. - BRIDGE PLUG & RTTS SET IN 1ST PERF JOB INTERVAL. - RE-SET BP @ 11,400~ & RTTS @ 11,342~. ATTEMPT TO ESTABLISH INJECTION RATE. - GETTING RETURNS. MOVE RTTS UP HOLE 4~ & ATTEMPT TO ESTABLISH INJECTION RATE. - GETTING RETURNS. MOVE RTTS UP HOLE 2~ & TRY AGAIN.- GETTING RETURNS. MOVE RTTS DOWN TO 11,352~, STILL GETTING RETURNS. NOTE; ACTS LIKE COMMUNICATION BETWEEN PERF. ZONES. WILL RIG UP & RUN ATLAS WL G/R TO VERIFY DEPTH OF RA MARKER. MONITOR WELL - PREPARE RIG FLOOR TO RUN ATLAS WL. R/U ATLAS WL - RIH W/ G/R & VERIFY DEPTH OF RA MARKER & RTTS. NOTE; ALL DEPTHS ACCURATE. 19~ DIFF. BETWEEN WIRELINE & TUBING. PICK UP & SET RTTS @ 11,257~ - BRIDGE PLUG @ 11,400. - ATTEMPT TO ESTABLISH INJ.RATE INTO PERFS FROM 11,274~ TO 11,370~, (DIL), GETTING RETURNS. PULL RTTS ABOVE ALL PERFS @ 10,885~ & SET. ATTEMPT TO ESTABLISH IN- JECTION RATE. - GETTING RETURNS. NOTE; EITHER CIRCULATING SUB OR RTTS HAS MECH. FAILURE. PREPARE TO TOOH TO CHECK TOOLS. NOTE; HOLE TAKING 2.5 BBL/HR. NOTE: DRILLERS DEPTH. 19~ DEEPER THAN DIL DEPTH. 032291 POOH W/RTTS/CIRC VALVE. LAY DOWN SAME. MAKE UP NEW RTTS/CIRC VALVE.- RIH. SET RTTS @ 9205~DD. - PUMP ANNULUS TO 1000 PSI. - NO LEAKS. RIH TO 11,345~DD. SET RTTS AT VARIOUS DEPTHS TO CHECK FOR COMMUNICATION BETWEEN PERF. NOTE; BRIDGE PLUG SET @ 11,400~DD. SET RTTS @ 11,345~DD, 11,251~DD, 11,270~DD. ALL SHOWED COMMUNICATIONS. SET @ 10,885~DD (ABOVE ALL PERFS.) NO COMMUNICATIONS. SET @ 11,150~DD, & 11,117~DD. - COMMUNICATIONS. SET @ 10,885~DD - NO COMMUNICATIONS. RIH TO 11,345~DD & SET RTTS. TEST LINES TO 3500 PSI. - CLOSE RAMS & APPLY 1000 PSI TO BACKSIDE. - PUMP DOWN TUBING W/ HOWCO TO ESTABLISH INJECTION RATE. (WILL MAINTAIN SAME PRESSURE ON BACKSIDE AS INSIDE. PRESSURE LIMITATIONS IS 3100 PSI) PUMP DOWN TUBING TO 2700 PSI. - NO INJECTION RATE, PERFS ARE NOT TAKING FLUID. - CONTACT ENGINEERING FOR NEW GAME PLAN. MONITOR WELL - DISCUSS JOB W/ ENGINEERING. OPEN CIRC. VALVE & SPOT 19 BBL 7.5% HCL, 10 BBL. 7.5% HCL/ 1.5% HF, 19 BBL. CLAY FIX, & 50 BBL 9.5 #/GAL F-FIW. - CLOSE CIRC. VALVE. - CLOSE RAMS & APPLY 2700 PSI ON BACKSIDE. PUMP 48 BBL. 9.5 #/GAL. F-FIW, DISPLACING ACID & CLAY FIX IN PERFS. MONITOR PRESSURES. - FINAL CIRC. PRESSURE WAS 2200 PSI @ .5 BBL/MIN. ISIP : 2129 PSI - SHUT IN PRESSURE @ REPORT TIME : 100 PSI. NOTE; ALL DEPTHS REPORTED ARE DRILLERS DEPTHS. THERE IS A 19~=-' DIFFERENCE BETWEEN DRILLER & WIRELINE. DRILLERS DEPTH IS DEEPER. 032391 MONITOR "FALL OFF" ON SHUT IN PRESSURE. OPEN WELL. - FLOWING UP TUBING. - MONITOR PRESSURE - 50 PSI TUBING & 0 ANNULUS. REV. CIRC. TUBING VOLUME. UNSEAT RTTS & BRIDGE PLUG. - PULL & SET BRIDGE PLUG @ 11,350~. - SET RTTS @ 11,252~. (HI-HK) - RIG UP HOWCO LINES. TEST LINES TO 3500 PSI. - CLOSE RAMS & PRESSURE ANNULUS TO 2500 PSI. ESTABLISH INJECTION RATE. (.42 BBL/MIN @ 2250 PSI) UNSEAT RTTS & RETRIEVE BRIDGE PLUG. - SET BRIDGE PLUG @ 11,252~. - SET RTTS @ 11,161~. (HD-HE - HE-HF) TEST LINES TO 3500 PSI. - PRESSURE ANNULUS TO 2500 PSI. - ESTABLISH INJECTION RATE. - .2 BBL/MIN @ 2800 PSI. OPEN CIRC. VALVE. - PUMP 33 BBL 7.5% HCL, 16.6 BBL 7.5% HCL/ 1.5% HF, 33 BBL. CLAY FIX, & 14 BBL 9.5 #/GAL. BRINE. CLOSE CIR. VALVE. - PUMP 83 BBL. 9.5 #/GAL. BRINE. FINAL DISPLACEMENT RATE .8 BBL/MIN @ 2825 PSI. MONITOR ISIP. - FINAL PRESSURE 275 PSI. BLEED PRESSURE & REV. CIRC. TUBING VOLUME. UNSEAT RTTS & RETRIEVE BRIDGE PLUG. - SET BRIDGE PLUG @ 11,140' & RTTS @ 11,075'. (HC-HD) TEST HOWCO LINES TO 8000 PSI. - ESTABLISH INJECTION RATE. - .9 BBL/MIN @ 2600 PSI. UNSEAT RTTS & RETRIEVE BRIDGE PLUG. - SET BRIDGE PLUG @ 11,167'. SET RTTS @ 11,135'. - PRESSURE TEST BRIDGE PLUG TO 3500 PSI. UNSEAT RTTS & RESET @ 11,075'. - ESTABLISH INJECTION RATE.-.78 BBL/ MIN @ 2600 PSI. BLEED PRESSURE. - RIG DOWN LINES. - UNSEAT RTTS & RETRIEVE BRIDGE PLUG CHECK FLOW & POOH. 032491 POOH W/ RTTS & BRIDGE PLUG. - LAY DOWN TOOLS. TEST BOPS - HYDRIL TO 250/3500 PSI - BOP & ALL RELATED SURFACE EQUIP. TO 250/5000 PSI. RIH W/ MULE SHOE. - TAG SAND @ 11,539' REV. SAND OUT FROM 11,539' TO 11,655'. - SPOT 185 BBL. 1MFIW DO~N TUBING. POOH W/ MULE SHOE. RIH W/ BIT & SCRAPER. - TAG BOTTOM @ 11,655'. REV. CIRC. VOLUME FROM LINER TOP TO SURFACE. SPOT 175 BBL 1MFIW DOWN TUBING & OVER PERFS. - SLIP & CUT DRLG. LINE. WELL OUT OF BALANCE, MIX & PUMP DRY JOB. POOH W/ BIT & SCRAPER. NOTE; ALL DEPTHS REPORTED ARE DRILLER DEPTHS. (-19' FOR WIRELINE) 032591 POOH W/BIT & SCRAPER. PICK UP UP RTTS & RIH.-SET RTTS @ 11,522'DD. - HOLD SAFETY MEETING W/ PERSONNEL. - TEST LINES TO 4000 PSI. - ATTEMPT TO ESTABL,SH ,NJECT,ON RATE. GETT,NG COMMUN,CATIONS. PULL RTTS UP HOLE & SET @ 11,500' DD.- (9' BELOW BOTTOM HK-HN PERF) - ATTEMPT TO ESTABL,SH INJECT,ON RATE.- GETT,NG COMMUNICAT,ONS. RIG DOWN HOWCO LINES & MOVE RTTS UP HOLE TO 10,885'. (ABOVE ALL PERFS) SET RTTS & TEST- HOLD,NG DOWN TUBING & DOWN BACKS,DE. POOH W/ RTTS RIH W/ O/S TO RETRIEVE BRIDGE PLUG @ 11,660'. - TAG S^ND ^SH S^ND RO, BR,D ,LU APPEARS.v BE i5' DOWN FROM REPORTED SETTING DEPTH WORK TUBING TO SEE IF WE HAVE RETRIEVED BRIDGE PLUG. MIX & PUMP POLYMER SWEEP. SPOT 185 BBL. 9.5 #/GAL. 1MFIW. DOWN TUBING. NOTE; ALL REPORTED DEPTHS ARE DRILLERS DEPTHS. (19' DIFF. BETWEEN DRILLER & WIRELINE. WIRELINE IS -19 OFF DRILLERS) 032691 NOTE; ALL REPORTED DEPTHS ARE WIRELINE DEPTHS. PULL UP HOLE 150' & ATTEMPT TO SET BP. - NO SET - RIH & TAG BP@ 11~56;. - PICK, UP KELLY~ WASH & ROTATE OVER BP TO 11,657'. - REV. CI~ ~. SAND OFF BP. - PICK UP TO UNSET BP (50,000 OVER) WOULD NOT RELEASE. - CIRC. HARD DOWN TUBING FOR SEVERAL MINUTES. - PULL 65,000 OVER STRING WT & BP RELEASED. REV. CIRC. HOLE CLEAN. - DISPLACE 195 BBL. 1MFIW DOWN TUBING. POOH W/ BP. MAKE UP CONE LESS BIT & RIH. - TAG FILL @ 11,774'. WASH & REV. CIRC. FILL FROM 11,774' TO 11,819'. SPOT 185 BBL. 1MFIW DOWN TUBING. POOH FOR COMPLETION TOOLS. PICK UP COMPLETION TOOLS. - DRIFT, STRAP, & RIH W/ 2 7/8" TUBING. 032791 DRIFT, STRAP, & RIH W/ 2 7/8" COMPLETION STRING. MAKE UP CONTROL LINE FOR SSSV & PRESSURE TO 3000 PSI. R/U SLICKLINE. - RIH & PULL DUMMY SSSV. - R/D SLICKLINE. PUMP FLUID THROUGH CONTROL LINE. - LAND TBG. HANGER IN TBG. SPOOL. RUN IN TIE DOWN PINS.- PRESSURE TBG. TO 2500 PSI TO SET PACKER. - PRESSURE BACKSIDE TO 1500 TO CONFIRM PACKER SET. - GOOD - PRESSURE TUBING TO 4000 PSI TO SHEAR OUT OTIS RE-ENTRY GUIDE. R/U SLICKLINE - RIH & SHIFT SLIDING SLEEVE. - POOH - RIH W/ 2 1/8" DUMMY PERF GUN TO 11,050'. - POOH & R/D SLICKLINE. INSTALL BPV. N/D BOPE & RISER. N/U XMAS TREE. TEST TREE TO 5000 PSI. PULL BPV. PUMP DOWN TBG. W/ 8.5 #/GAL 1MFIW DISPLACING 9.5 #/GAL. TAKING RETURNS TO PRODUCTION HEADER. NOTE; DEPTHS ARE DIL MEASUREMENT. OTIS RE-ENTRY GUIDE 11,004' OTIS XN NIPPLE 10,993' BAKER PACKER 10,961' BAKER PBR 10,954' SLIDING SLEEVE 10,903' GLM #10 10,868' #9 10,321' #8 9774' #7 9256' #6 8643' #5 7878' #4 #3 #2 #1 SSSV 6893' 5496' 3784' 1948' 302' 04199Ia.doc MGS C22A-26 WELLBORE DIAGRAM - 4/16/91 Z .'1 '.2 '.3 '.4 !10 X , FISH OTIS "XXO/BXE" SSSV @ 302' 24" Conductor Casing @ 370 ' 13-3/8" 54.5# K-55 Surface Casing @ 1155' ...... 2-7/8" 6.5# L-80 EUE 8rd Tubing -- X-over 9-5/8" 43.5# to 47# @ 4123' GLM MD TVD PORT Ptro Pso 1 1948' 1897' 12 993 950 2 3784' 3395' 12 1000 925 3 5496' 4669' 12 970 4 6893' 5642' 16 1034 879 5 787'8' 6363' 16 1034 868 6 8643' 7077' 16 1035 849 7 9256' 7687' 20 1155 835 8 9773' 8190' 20 1140 818 9 10321' 8'694' 20 1146 789 10 10869' 9137' 5/16" ORIFICE ..... Top of 7" Production Liner @ 8989' 9-5/8" 43.5#/47# L-80 Casing @ 9797' ..... X-over 7" 26#/29# L-80 to 32# P-110 @ 10691' OTIS "XD" Sliding Sleeve @ 10903' BAKER 15' PBR (80-32 for "HB" Pkr) @ 10954' ..... BAKER "HB" Pkr (40,000# shear) @ 10961' OTIS "XN" Profile Nipple @ 10993' OTIS Wireline Re-Entry Guide @ 11004' := HC-HD 11076-11104' MD 9284-9304' TVD := HD-HE 11160-11173' 9341-9350' := HE-HF 11186-11218' 9357-9381' := HI-HK 11274-11322' 9419-9451' := HK-HN 11336-11472' 9460-9549' := HN-HR 11520-11640' 9581-9660' := HR-HZ 11670-11780' 9681-9758' I PBTD @ 11824' \ 7" 32# P-110 Production Liner @ 12039' TD @ 12140' (Top of Fish-Bit BHA @ 12039') Shell Western E&P. Inc. 601 West Fifth Avenue Suite 800 Anchorage, Alaska 99501 May 9, 1991 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen- SUBJECT' SUBMISSION OF MISSING DRILLING REPORTS FOR WELL COMPLETION OF C22A-26 Enclosed are duplicate copies of drilling reports from well C22A-26. Their absence from the well completion we sent in on April 27, 1991 was an oversight on our part. We hope this has not caused any confusion or trouble. If you have any questions, please call me at (907) 263-9614. Sincerely, Susan L. Murnan Environmental Clerk Enclosures DAILY REPORT OF OPERATIONS C22A-26 DATE ACTIVITY 7/18/90 RIG ACCEPTED @ 1200 hrs. 07/17/90. GRACE DRLLG, CREW CONTRACTOR. P/U CLEAN OUT ASMY, TIH & TAG TOP OF (OLD) CEMENT @ 47~. DRILL FIRM CEMENT F/47~ T/147~. STAND BACK KELLY. RIH W/FREE PIPE & TAG TOP OF CEMENT @ 262~. P/U KELLY. DRILL FIRM CEMENT F/262~ TO 375~. CIRCULATE HOLE. R/U DIALOG WL. BOPE/FUNCTION TEST DIVERTER SYSTEM. TRIP TO CHANGE BHA. RIH W/MUD MOTOR & MWD BHA. ENCOUNTER BRIDGE @ 318~ P/U KELLY, ROTATE THROUGH BRIDGE T/338~ RIG REPAIR. CHANGE OUT WASHPIPE ON SWIVEL ASMY. ROTATE THROUGH CEMENT FILL F/338~ T/375~ RUN GYRO BASELINE SURVEY. BEGIN KICKOFF iSPUD) @ 2300 hrs. 07/17/90 DRILL CEMENT W/MUD MOTOR. DISPLACE CEMENT CONTAMINATED SEAWATER W/GEL MUD (#2), ADD LIME AS REQ. DRILL KICKOFF W/MUD MOTOR, BENT SUB, MWD ASMY. RUN GYRO SURVEY EVERY 30~ OR AS REQUIRED. 7/19/90 DIRECTIONAL DRILL KICKOFF W/MUD MOTOR/MWD/BENT SUB BHA, F/443~ T/962~. RUN GYRO SURVEYS TO CONFIRM DIRECTIONAL DATA AS REQUIRED. 7/20/90 DRLG/SURVEY F/962~ T/1036~. ENCOUNTERED "CONE OF UNCERTAINTY" OF WELL C24-26RD. SECURED DRLG OPERATIONS. RIG UP AND BLED OFF CSG/TBG PRESSURE FROM C24-26RD. DRLG/ SURVEY F/1036~ T/1019~. MOTOR STALLED, SURVEYS INDICATE COULD BE AGAINST WELL #C24-26RD. SECURED DRLG OP~S. POH, SLM OUT, NO CORRECTION. STOOD BACK MOTOR/MWD. MADE UP CLEAN OUT ASSMY. TOTCO RING AT BIT FOR BTM HOLE SURVEY. WASH REAM T/983 AT RPT TIME. HAVING T/REAM ALMOST EVERT JT DOWN. BIT #1RR COND: 3-3-WT-A-E-4-BU-PR 7/21/90 FINISHED WASH/REAM T/1091~. CIRC/COND FOR GYRO SURVEY. RAN GYRO SINGLE SHOT SURVEY; INSTRUMENT DEPTH AT 1082~, BIT AT 1090~. PULLED T/SHOE AT 375~. (MOVED SURVEY EQUIP T/C24-26RD) CDL 242~ WHILE WIRELINER PULLED SSSV FROM C24-26RD AND MADE GAGE RUN. RAN MULTI-SHOT GYRO FROM 1500~, 50~ STATIONS ON C24-26RD. WITH GYRO INFO OF BOTH WELLS IN CONJUCTION WITH SURF. INDICATIONS OF BIT RUNNING ON "OTHER THAN FORMATION" DECISION WAS MADE TO PLUG BACK. FINISHED POH. MADE UP 300' OF 3.5" TBG STINGER ON 5" DP, TIH T/1090~. CIRC/COND F/CMT. RIG UP HOWCO LINES, TEST T/lO00#. OK. PUMPED 50 BBLS FRESH WATER AHEAD OF 400 SX CLASS ~G~ CMT (73 BBLS SLURRY) + 1.25% OF CFR-3 + 2% CACL2, 1 BBL WATER BEHIND, DISPLACED W/12 BBLS MUD. CIP AT 1930 HRS 07/20/90. POH, LAYED DOWN TBG STINGER WOC; REPAIR KELLY SPINNER CLUTCH. REPLACED DRIVE BUSHING ROLLERS/BRG MAKE UP KICK-OFF BHA, TIH. TAGGED HARD CMT AT 852~. BEGIN KICKING OFF AT REPORT TIME. slm/O30491A. 7/22/90 CIRC/COND THICK MUD AT 852', TOP OF CEMENT. DRLG/SURVEY F/852' T/918. REPAIR MUD PUMP. LINER/SWAB. DRLG/SURVEY F/918' T/1155'. CSG PT. POH, LAY DOWN MUD MOTOR. MAKE UP CLEAN OUT ASSMY, TIH T/852'. REAM OUT MOTOR RUN FROM 852' T/1155' W/BIT #2RR. 7/23/90 RAN GYRO SURVEY AT BTM. CIRC/COND FOR CSG. POH, LAYED DOWN MWD. HELD PRE-JOB SAFETY/OPERATION MEETING W/CREWS; RIG/RAN 30 JTS 13.375" 54.5#, K-55, BTC, R-3 CASING. 1162' "ON HOOK". BAKER PLAIN GUIDE SHOE SET AT 1155', BAKER FLT COLLAR AT 1114'. INSTALLED 6 CENT'S; 10', 40 80, 120' 200',AND 360'. INSTALLED HOWCO SINGLE PLUG CEMENTING HEAD. RECIP PIPE 20 WHILE CIRC/COND FOR CMT. DROP BTM PLUG, LOAD TOP PLUG. PUMPED 5 BBLS FRESH WATER, TEST LINES T/2000#. OK. PUMPED 45 BBLS FRESH WATER AHEAD OF 221SX CLASS 'G' CMT+IO% GEL+.5% CFR-3+2% CACL2. 12.8 PPG, 11.5 GAL/SX, YLD 2.08 CF/SX. TAILED W/200 SX CLASS 'G' CMT +1% CACL2 + .2% CFR-3. 15.8 PPG, 5.0 GAL/SX, 1.15 CF/SX YIELD. DROP TOP PLUG, DISPLACED W/165.5 BBLS INLET WATER. NO BUMP, FLOAT HELD. CLEAR FLOOR OF CSG/CEMENTING TOOLS. RIG DOWN DIVERTER LINES, FLOW NIPPLE. PICKED UP STACK, ROUGH CUT 13.375" CSG. LAYED DOWN LDG JT. CONTINUE NIPPLING DOWN 20" STACK AT RPT TIME. BIT #2RR COND: 4-4-WT-A-E-I-NO-TD 7/24/90 FINISHED NIPPLING DOWN 20" DIVERTER SYSTEM; RAN 121' OF 1" OUTSIDE OF 13.375" CSG. PUMPED 48 BBLS WATER AHEAD OF 239 SX CLASS 'G' CMT. WELD ON/TEST WELLHEAD T/850 PSI FOR 15 MINS. OK. WELD BRACES T/COND. NIPPLE UP 13 5/8" BOPE STACK. TEST ALL BOPE EQUIP. OK. INSTALLED WEAR BUSHING. LAYING DOWN 17.5" BHA'S/EXCESS DP F/DERRICK AT RPT TIME. 7/25/90 FINISHED LAYING DOWN DC/DP FROM DERRICK. MAKE UP DRILLING BHA ON BIT #3, TIH, TAG CMT AT 1038'. TEST CSG T/1500 PSI F/30 MINS. OK. DRLG OUT CMT/PLUGS/SHOE FROM 1038' T/1155'. DISPLACED INLET WTER W/MUD. DRLG 12' DID LEAK OFF TEST: 14.59 PPG EMW DRLG F/1167' T/1348'. DID 5 POINT MWD SHOTS. DRLG/SURVEY W/MWD F/1348' T/1988' W/BIT #3. CHECK F/FLOW, NONE. POH FOR BHA. LAYED DOWN MC, PICKED UP ANOTHER LC, CNG BITS, TIH AT RPT TIME. BIT #3 COND: 1-2-BT-E-I-RG-BHA NOTE: 1ST FOOT OF 12.25" HOLE WAS DRILLED AT 1400 HRS 07/24/90. 7/26/90 DRLG F/1988' T/2109' W/BIT #4. DID 5 POINT MWD SURVEY. DRLG/SURVEY W/MWD F/2109' T/2875' W/BIT #4. MWD PLUGGED. GOT IT UNPLUGGED. CLEANED OUT FLOW LINE JETS. CIRC SURF SYSTEM CLEAN. DRLG/SURVEY W/MWD F/2875' T/3220' W/BIT #4. 7/27/90 DRLG/SURVEY F/3220' T/3570' W/BIT #4. CHECK F/FLOW, NONE. POH, LAYED DOWN MWD AND 11' LEAD COLLAR. CHANGED OUT SPERRY SUN ROTARY RPM GEN. CLEANED MUD PUMP SCREENS. CNG OUT SUCTION LINE VALVE BETWEEN PUMPS. WELDOR REPAIRED MOUSE HOLE AND KELLY BAIL GUARD. MAKE UP BIT #5, PICKED UP NEW MWD, TEST AT 1ST "IF" CONN; TIH. DID 5 POINT MWD SURVEY AT 3466' DRLG/SURVEY F/3570' T/q000' W/BiT #5. BIT #4 COND: 3-3-CT-A-E-I-ER-BHA slm/O30491A. 7/28/90 DRLG SURVEY W/MWD F/4000' T/4925' W/BIT #5. CHECK F/FLOW, NONE. POH, LAY DOWN SHOCK SUB, MKING UP MUD MOTOR ASSMY AT RPT TIME. BIT #5 COND: 5-5-BT-A-E-1-CT-BHA (WEAR PADS WERE FULL GAGE) 7/29/90 FINISH MAKING UP MUD MOTOR ASSMY. TIH W/BIT #3RR. DID 5 POINT MWD SURVEYS. DRLG/SURVEY W/MUD MOTOR F/4925' T/5169' W/BIT #RR. FINISHED MOTOR RUN; CHECK F/FLOW, NONE. POH AT RPT TIME F/BHA. 7/30/90 FINISH POH W/BIT #5. LAY DOWN MUD MOTOR. MAKE UP BIT #6 AND BHA. TIH. REAM OUT MOTOR RUN F/4925' T/5169' W/BIT #6. DRLG F/5169' T/5295' W/BIT #6. DID 5 POINT MWD SURVEY. DRLG/SURVEY F/5295' T/5455' W/BIT #6. BIT QUIT DRILLING. CHECK F/FLOW, NONE. STARTED OUT OF HOLE, PULLED 8 STDS, LOST ALL DC POWER T/RIG. FOUND #1 RECTIFIER TRANSFORMER/WIRING BURNED UP. SECURED IT FROM OP'S. PUT #2 ON LINE. ELECTRICIAN'S, GRACE/SHELL'S BOTH, BEGAN ROUNDING UP SPARE PARTS/WIRING TO REPAIR #1 RECTIFIER WHEN OUT OF THE HOLE. FINISHED POH. SECURED AC/DC POWER FROM RIG SYSTEM. REPLACED TRANSFORMER/WIRING #1 RECTIFIER. TESTING CIRCUTS AT RPT TIME. BIT #3RR COND: 2-2-BT-M-E-I-RG-BHA BIT #6 COND: 8-8-BT-A-E-I-CT-PR 7/31/90 FINISH CIRCUT TEST ON #1 RECTIFIER. TIH T/SHOE. CHECKED MWD WHILE FILLING DP. CDL 100'. CHCK LOAD ASSIGNMENTS, DC POWER THRU #1 RECTIFIER. OK. INSTALL GUARDS FINISHED TIH W/BIT #7. DRLG F/5455' T/5547' W/BIT #7. DID 5 POINT MWD SURVEY. DRLG/SURVEY W/MWD F/5547' T/5690' W/BIT #7. CHECK F/FLOW, NONE. POH, PICKED UP MLC/BIT SUB/XO. BIT WAS OK. DID WEEKLY BOPE TEST. OK. TIH T/SHOE W/BIT #7RR. TEST MWD WHILE FILLING DP. #5 DC ENGINE DIED. WORK ON FUEL SYSTEM AND GOT IT GOING. LOST MPIA ASSIGNMENT. FOUND BREAKER TRIPPED ON #1 MUD PUMP, 'A' MOTOR. RESET OK. STARTED GOING ON IN THE HOLE AT RPT TIME W/BIT #7RR. 8/01/90 FINISHED TIH T/5690' W/BIT #7RR. DRLG F/5690' T/5811' W/BIT #7RR. DID 5 POINT MWD SURVEY. DRLG/SURVEY W/MWD F/5811' T/6300' W/BIT #7RR. 8/02/90 DRLG F/6300' T/6369' W/BIT #7RR. CHECK F/FLOW, NONE. POH. CNG BHA/BIT. TIH T/SHOE W/BIT #8. CNG DC POWER/CONTRL LEADS F/#5 CAT T/#6 WAUKESHA. MECHANIC WORKING ON #5 CAT SHUT DOWN SYSTEM AND OVRSPEED CONTROLS. CLEANED OUT AIR SYSYEM ON DWKS CONTROLS/CLUTCHES. SERVICED RIG. FINISHED TIH W/BIT #8. DRLG F/636g' T/6417' W/BIT #8. DID 5 POINT MWD SURVEY AND SWITCHED POWER/CONTROL LEADS BACK T/#5 CAT. DRLG/SURVEY W/MWD F/6417' T/6670' W/BIT #8. BIT #7RR COND: O-1-BT-3-E-I-CT-BHA 8/03/90 DRILL 12.25" HOLE W/BIT #8 & MWD SURVEY F/6670' T/7020'. REMOVE/CLEAN/INSTALL LOW CLUTCH PNEUMATIC CONTROL VALVE ON DRWWKS. DRILL AHEAD & MWD SURVEY W/BIT #8 F/7020' T/7151' AT REPORT TIME. slm/O30491A. 8/04/90 DRILL & MWD SURVEY 12.25" HOLE W/BIT #8 F/7151' T/7195'. CHECK FOR FLOW, PUMP PILL. TRIP FOR BIT & BHA CHANGE. L/D BIT #8 & MC. CHNG N/B STAB BLADE. P/U BIT #7RR, NM LDC. CHNG FILTER IN MWD, TEST SAME. TIH T/4000' & FILL PIPE. TIH T/7195'. NO BRIDGES OR FILL OBSERVED. DRILL F/7195' T/7270'. RUN 5 POINT MWD SURVEY. DRILL & MWD SURVEY W/BIT #7RR F/7270' T/7425'. BIT #8 GRADING: 4.7.BT.A.E.I.CT.PR 8/05/90 DRILL & MWD SURVEY 12.25" HOLE W/BIT 7RR F/7425' T/7443'. TRIP FOR BIT & BHA CHANGE. CHECK FOR FLOW, PUMP PILL, L/D LDC & NMSTB. P/U LDC & MDC W/BIT #9. TIH, TEST MWD, STOP & FILL PIPE @ 4000'. DRILL W/BIT #9 BHA F/7443' T/7538'. 8/06/90 RUN 5 POINT MWD SURVEY. DRILL & MWD SURVEY F/7538' T/7645' @ REPORT TIME. BIT #7RR GRADING: 4.3.BT.A.E.I.CT.BHA 8/06/90 DRILL & MWD SURVEY 12.25" HOLE W/BIT #9 F/7645' T/7724'. SHORT TRIP 5 STDS. DRILL & MWD SURVEY F/7724' T/7975'. CHECK FOR FLOW, PUMP PILL, TRIP FOR BIT. TIGHT @ 6652'. CHANGE OUT JARS, 2 LOWER STAB BLADES, MWD SCREEN. P/U BIT #10. TIH T/1200'. SLIP & CUT 100' OF DRILL LINE @ REPORT TIME. BIT #9 GRADING: 8.8.BT.A.E.2.WT.PR 8/07/90 SLIP & CUT 100~ OF DRILL LINE. TEST MWD BELOW CSG SHOE. TIH W/BIT #10 ASMY T/5000', FILL PIPE. TIH T/7850', P/U KELLY. REAM F/7850' T/7975~. DRILL & MWD SURVEY 12.25" HOLE F/7975' T/8244'. CHECK WELL FOR FLOW, SHORT TRIP 5 STDS. DRILL & MWD SURVEY F/8244' T/8323'. 8/08/90 DRILL & MWD SURVEY 12 25" HOLE F/8322' T/8325'. CHECK FOR FLOW, PUMP ~ILL. TRIP FOR BIT AND BHA CHANGE. TIGHT SPOTS @ 8244' & 8325'. TEST KELLY & CHOKE VALVES WHILE POH. TEST BOPE: TEST ALL VALVES, RAMS, KELLY, ANN. PREVENTER @ 250/3000# TEST CHOKE MANIFOLD/VALVES @ 250/5000#. FUNCTION TEST ACCUMULATOR AND CONTROL MANIFOLD. PULL TEST ASSEMBLY, RESET WEAR RING. L/D MDC, CHG MWD, CK STBS. P/U NM LDC. TIH 1200', TEST MWD. TIH FILL PIPE @ 4552~ & 8267'. P/U KELLY & REAM F/8267' T/8325'. DRILL W/BIT #11 F/8325~ T/8410'. RUN MWD 5 POINT SURVEY. DRILL & MWD SURVEY F/8410' T/8578' @ REPORT TIME. BIT # 10 GRADING: 8.7.BT.MH.E.2.LT.PR 8/09/90 DRILL & MWD SURVEY 12.25" HOLE W/BIT #11 F/8578' T/8598'. OBSERVE FROM SURVEYS HOLE DIRECTION BEGAN TURNING TO LEFT. SHORT TRIP 5 STDS. TIH & MWD SURVEY FOR CONFIRMATION SHOT. TRIP FOR COURSE CORR/BHA CHANGE: PUMP PILL, POH, L/D BIT #11 BHA. P/U BAKER 7.25" LOW SPEED, HIGH TORQUE MUD MOTOR W/1.75d BENT SUB. TIH TEST MUD MOTOR & MWD, FILL PIPE @ 4036'. ORIENT ASSEMBLY W/BIT #12. DRILL W/MUD MOTOR F/8598~ T/8643' ROTARY CLUTCH QUICK RELEASE FAILED. WORK PIPE/REPAIR SAME. DRILL W/MUD MOTOR F/8643' T/8652' @ REPORT TIME. BIT #11 GRADING: 1.1.NO.A.E.I.NO.BHA slm/O30491A. 8/10/90 DRILL & SURVEY W/MUD MOTOR/BENT SUB/MWD ASHY F/8652~ T/8688'. POH FOR BHA CHANGE. PIPE BECAME STUCK IN (APPARENT) KE¥SEAT @ 4931' (BIT DEPTH) WHILE POH. WORK PIPE, LOST DOWN-JAR ACTION. JAR UP WITH NO RESULTS. WORK PIPE FREE ON DOWNSTROKE, UNABLE TO COME UP BEYOND 4931' (BD). REAM UP W/SLIPS, FREE PIPE. COME UP 60' AND PIPE STUCK IN KEYSEAT @ 4869'(BD). WORK PIPE THROUGH KEYSEAT. LOST UP-JAR ACTION. WORKING ON STUCK POINT @ 3848'. REPORT TIME. THESE KEYSEATS APPEAR TO BE THE RESULT OF THE MOTOR RUN. 8/11/90 WORK STUCK PIPE THROUGH KEYSEATS @ 3848, 3694~ & 3690~. LOST ALL DRILLING JAR ACTION. WORK PIPE & REAM THROUGH TIGHT SPOTS. POH W/BIT #12 MOTOR ASHY. CHNG BHA, P/U NEW MWD, JARS & KEYSEAT WIPER. TIH W/BIT #12RR ASHY BELOW SHOE. TEST MWD. CHANGE FROM 5.5" TO 7" LINERS IN MUD PUMPS. SLIP & CUT 100~ OF DRILL LINE. SAFETY CHECK DERRICK FOR LOOSE PINS/FITTINGS RESULTING FROM JARRING. TIH T/5662~. P/U KELLY & REAM BRIDGES @ 3626' 5094~ POH T/3800, WORK STABS & KEYSEAT WIPER THRU T~GHT SP~TS @3626, 6212 TIN T/6214'. POH T/3800'. WORK KEYSEAT WIPER THRU TIGHT SPOT @ 6010 TIH T/8585~. REAM MOTOR RUN F/8598~ T/8688' DRILL & MWD SURVEY 12.25" W/BI~ #12RR ASHY F/8688~ T/8726~. REPAIR KELLY SWIVEL PACKING, RECIPROCATE PIPE. RUN MWD 5 POINT SURVEY. DRILL & MWD SURVEY F/8726~ T/8757' @ REPORT TIME. BIT #12 GRADING: 2.2.NO.A.E.I.NO.BHA BIT #12 IS - ATJMCP11C TYPE 8/12/90 DRILL & MWD SURVEY W/BIT #12RR F/8757' T/8819~. MWD SURVEY, EVALUATE SURVEY DATA. DRILL & SURVEY F/8819' T/8972~. TRIP FOR BHA. WORK PIPE THROUGH TIGHT SPOTS W/POH. L/D BIT #12RR BHA. BIT #12RR DEVELOPED A WASHED OUT CENTER JET. P/U BIT #13 W/8" NAVI-DRILL MACH 1 MUD MOTOR & 1.75d BENT SUB. RUN UNDERGAUGE XO STAB & KEYSEAT WIPER TO REDUCE TRIP PROBLEMS. TIH T/SHOE, TEST MWD & MUD MOTOR. TIH T/5000' & FILL PIPE. TIH T/8897', WORK THROUGH TIGHT SPOTS @ 4080' & 8167". P/U KELLY TO REAM @ REPORT TIME. - BIT #12RR GRADING: 2.2.CT.NM.E.1.WO.BHA - WASHED OUT CENTER JET 8/13/90 P/U KELLY & REAM F/8897' T/8972' W/BIT #13 ASHY. DIRECTIONAL DRILL W/MUD MOTOR & MWD SURVEY 12.25" HOLE F/8972' T/9117' REPAIR ROTARY CLUTCH QUICK RELEASE, RECIPROCATE PIPE AS REQUIRED. DRILL W/MUD MOTOR & MWD SURVEY F/9117' T/9161'. TRIP FOR BHA: CK F/FLOW, PMP PILL, TIGHT @ 6110~ & 3090~ L/D MUD MOTOR ASHY, CHNG DN JAR (PREMATURE FAILURE ON SE~L), P/U BIT #14 BHA & TIH T/SHOE, TEST MWD, TIH T/5000~ FILL PIPE, TIH @ 7890~ REPORT TIME. BIT #13 BIT GRADING: 1.1.NO.A.E.1.NO.BHA 8/14/90 WASH AND REAM THROUGH TIGHT SPOT AT 7985' WASHED OUT SWIVEL PACKING, CIRCULATE THROUGH POOR BOY SWIVEL AND CHANGE OUT PACKING UNIT. slm/O30491A. RIH TO 8972' REAM THROUGH MUDMOTOR RUN 8971' TO 9161' DRILLING 9161' TO 9467' RUN 5 POINT MWD SURVEYS AT 90' INTERVALS. MAKE 10 STAND WIPER TRIP, CONNECTIONS TIGHT AT 9283' AND 9375' 8/15/90 DRILL & MWD SURVEY 12.25" HOLE F/9467' T/9528'. TIGHT @ 9490' & 9528'. WORK PIPE FREE @ 9528' DRILL & MWD SURVEY W/BiT # 14 ASHY F/9528' T/9679'. WORK TIGHT HOLE @ 9624' & 9599'. DRILL & MWD SURVEY F/9679' T/9709'. WORK TIGHT HOLE @ 9645' SHORT TRIP 12 STDS T/8649'. DRILL F/9727' T/9739'. ~ORK PIPE FREE @ 9730'. DRILL & MWD SURVEY F/9739' T/9790'. 8/16/90 DRILL & MWD SURVEY 12.25" HOLE W/BIT #14 F/9790' T/9797' WORK TIGHT HOLE, CIRCULATE & FREE PIPE @ 9750'. OBSERVE ~ROP IN DRILL PIPE PRESSURE. CHECK SURFACE SYSTEM, DROP CARBIDE TRACER. POH W/BIT #14 ASHY: WORK STUCK PIPE FREE @ 9658', 8823' 7000', 6000', 4875' & 4725'. PULL STRING WET MONITORING FOR WASHOUT. L/D MWD, MONEL DC'S. INSPECT BHA FOR WASHOUT. P/U BIT #13RR BHA ASHY WITH STEEL DC'S. VISUAL INSPECT F/WASHOUT. TIH T/SHOE. SLIP & CUT 100' OF DRILL LINE. TIH, STOP & FILL PIPE @ 4977'. TIH T/9753'. WORK THROUGH TIGHT SPOTS @ 6020', 8442 & 8745'. LOCATE 3/8" WSHOUT IN G-105 PIPE TUBE NEAR BOX P/U KELLY & REAM F/9753' T/9797'. SHORT TRIP 12 STDS T/8683'. WORK TIGHT HOLE BOTH WAYS. CIRULATE & CONDITION MUD. POH (SLM) FOR LOGS & TO RUN CASING. TIGHT @ 8552' & 7492'. BIT @ 6823' REPORT TIME. BIT #14 BIT GRADING: 2.2.BT.MR.E.2.WT.PR/HR 8/17/90 FINISHED SLM OUT FOR LOGS. NO CORRECTION PER SLM. RIG UP WESTERN ATLAS. LOG DIL/SP/GR FROM LOGGERS TD OF 9795' TO 1155'. RIG DOWN LOGGERS. FINISHED INSTALLATION AND ALINEMENT OF BAYLOR ELECTRIC BRAKE. TRIPPING IN HOLE T/CIRC/COND FOR CASING AT RPT TIME. 8/18/90 PICKED UP KELLY. CIRC/COND FOR CASING. CHECK F/FLOW, NONE. POH W/CLEAN OUT ASSMY AND BIT #13RR. REMOVE WEAR BUSHING. CHGED PIPE RAMS T/CSG RAMS. TEST DOOR SEALS. OK HELD SAFETY/PRE-JOB MEETING W/RIG/CSG/CRANE CREWS. RIG T/RUN CSG. RUNNING CSG. BIT #13RR COND: 1-1-NO-A-E-2-SD-TD 8/19/90 FNSHED RUNNING CSG. DETAILED: USED 10 HOWCO CENT'S. 80' APART F/SHOE 106 135 JOINTS LENGTH DESCRIPTION FROM TO 37.70 KB TO CIW "WF" SEAT. 0.00 37.70 4167.77 9.625" 43.5# L-80 LTC 37.70 4205.47 5501.89 9.625" 47.0# L-80 LTC 4205.47 9707.36 .94 HOWCO SUPER SEAL FC 9707.36 9708.30 87.31 9.625" 47.0# L-80 LTC 9708.3011'~, 9795~61 1.39 HOWCO SUPER SEAL SHOE 9795.61'~ 9797.00 slm/O30491A. ***AMENDED REPORT******NOTE: CORRECTED # OF JTS/LENGTHS ON 08/20/90*** RIGGED HOWCO CMT HEAD/LINES. CIRC/COND W/RIG PUMP FOR CEMENT. HELD SAFETY MEETING W/RIG/CRANE/MUD MAN/HOWCO CREWS. CEMENTING DETAIL: PMPED 5 BBLS FRESH WATER, DROP BTM PLUG. TEST LINES T/2500#. OK. PUMP 95 BBLS FRESH WATER. MIX/PUMP 360 SX CLASS G + .4% CFR-3 + 1.5% GEL = 94 BBL SLURRY. TAILED W/200 SX CLASS G + .5% CFR-3 + .1% HR-7= 40 BBLS DROP TOP PLUG, DISP W/716 BBLS MUD. BUMP PLUG. CIP 1530 HRS 08/18/90 FLOATS HELD. HAD FULL RETURNS THRU OUT JOB. LIFT BOP~S, SET 306K ON "AW" SLIPS. CUT CSG, INSTLLED "AP" SPOOL TEST T/1080# OK. NIPPLE UP BOPE. TESTING BOPE AT RPT TIME. 8/20/90 FINISHED TESTING BOPE. OK. LAY DOWN 12.25" HOLE BHA FROM DERRICK. MAKE UP 8.5" HOLE BHA ASSMY. TIH W/BIT #15 T/6375~. CDL 100~. FILLED PIPE. FINISHED TIH. TAGGED UP ON PLUGS AT 9705~. DRILL OUT TOP/BOTTOM PLUGS/FLOAT COLLAR AND CEMENT DOWN TO 9741~. TEST CSG T/3000 PSI F/30 MINS. OK. DRILL CEMENT OUT T/SHOE AT 9797~. DRILLED 5~ OF FORMATION T/9802~. CHANGED OVER T/1% KCL MUD SYSTEM. DID LEAK OFF TEST W/9.5 PPG MUD TO EMW OF 16.7 PPG. NO LEAK OFF. POH W/BIT #15/CLEAN OUT ASSMY. MAKE UP MUD MOTOR/MWD ASSMY. TIH W/BIT #15RR. ORIENTING MOTOR AT RPT TIME. BIT #15 COND: O-O-NO-A-E-I-NO-BHA 8/21/90 ORIENT MUD MOTOR AT 9802~. DRLG F/9802~ T/9845~ W/BIT #15RR. PROBLEMS W/MWD STAYING IN SYNC TO OBTAIN TOOL FACE. MUD AIRED UP. MWD BEGAN WORKING, DRLG F/9845~ T/9878~ W/BIT #15RR. 300# LOSS IN PUMP PRESSURE, UNABLE TO MAINTAIN TOOL FACE W/MWD. MWD WORKING AGAIN DROPPED CARBIDE ON CONNECTION, MOTOR F/9878~ T/9886~ CARBIDE BACK 1000 STKS TOO SOON. CHECKED OUT SURFACE EQUIP. OK. POH W/WET STRING. NO VISIBLE WSH OUT FOUND. CHANGED OUT MWD/JARS. TIH W/BIT #16 ON DRILEX MOTOR. ORIENT MUD MOTOR. DRLG F/9886~ T/9925~ W/BIT #16. NEW MWD HOLDING TOOL FACE FINE. PUMP PRESSURE NORMAL. BIT #15RR COND: 4-6-BT-A-E-I-LT-W/O AND BAD MWD. 8/22/90 DRLG F/9925~ T/10002~ W/BIT #16 ON DRILEX MUD MOTOR. CHECK F/FLOW, NONE. POH. LAYED DOWN MOTOR/MWD. MAKE UP ROTARY BHA TIH. REAM OUT MOTOR RUN F/9797~ T/10002~. DRLG F/10002~ T/10208~ W/BIT #17. DROP TWO, SINGLE SHOT SURVEY INSTURMENTS FOR SURVEY AT 10139~. POH T/ SHOE T/RECOVER SURVEYS VIA WIRELINE AT REPORT TIME. BIT #16 COND: 2-2-BT-A-E-I-CT-BHA 8/23/90 FINISHED RETREIVING SURVEY AT 10208'. (BIT DEPTH) DRLG F/10208~ T/10520~ W/BIT #17. CHECK F/FLOW, NONE. DROP SURVEY INST~S. POH, TIGHT SPOT AT 9869~. RETRIEVED SURVEYS AT TOP OF HWDP. FINISHED POH. PICKED UP MONEL LEAD COLLAR IN PLACE OF MONEL DC. CNG BITS, TIH AT RPT TIME. BIT #17 COND: 5-5-BT-HM-F#3-I-CT-TQ slm/O30491A. 8/24/90 TIH W/BIT #18 T/SHOE. CDL 100~. REPLUMBING RETURN WATER LINE ON BAYLOR BRAKE. FINISHED TIN T/10520~. DRLG F/10520~ T/10767~ W/BIT #18. TIGHT HOLE ON CONN~S. RAISED MUD WT. T/IO.O PPG. CHECKED F/FLOW, NONE. DROP DUAL SINGLE SHOT SURVEY INST~S. PULLED UP T/SHOE. TIGHT SPOT AT 9959~. RETRIEVED SURVEYS W/WIRELINE. BOTH SURVEYS WERE SAME; ANGLE/DIRECTION. POH FOR NEW BHA. LAYED DOWN HWDP FOR REBUILT/NEW HWDP. STAB AT BIT WAS WORN 1/16" UNDER GAGE. STAB AT 42~ WAS FULL GAGE. CNG BHA AT RPT TIME. BIT #18 COND: 2-2-BT-MH-E-I-CT-BHA 8/25/90 MAKE UP NEW BHA. CHANGED OUT KELLY. PICKED UP 35 JTS REBUILT/NEW HWDP. TIH T/4950~, FILL PIPE, TIH T/SHOE FILL PIPE, TIH T/BRIDGE AT 10680~. REAM/CLEAN OUT F/10680~ T/10767'. DRLG F/10767~ T/10917~ W/BIT #19 CHECK F.FLOW, NONE. DROP DUAL SINGLE SHOT INST~S. POH. ENCOUNTERED TIGHT HOLE AT 10053~. (BIT DEPTH) WORKING THRU KEYSEATED MOTOR RUN, 100053~ T/9978~ AT RPT TIME. 8/26/90 REAM UP THRU MOTOR RUN FROM 9978~ TO SHOE AT 9797~. POH T/HWDP. RECOVER SURVEYS. POH. CHANGE BHA. LAYED DOWN 12 JTS "G" DRILL PIPE. (NEEDS REPAIR) CHANGED OUT DOWN JARS. TIH. FILLED PIPE AT 4950~ AND AT THE SHOE. CHANGED OUT ROTARY BACK BRAKE. REAMED F/9797~ T/10155~ W/BIT #20. PULLED BACK T/SHOE W/NO PROBLEMS. MOTOR RUN IN GOOD CONDITION AT THIS TIME. TIH T/10347~. ENCOUNTERED TIGHT HOLE/BRIDGES. REAMING/WASHING F/10347~ T/10510~ AT REPORT TIME. BIT #19 COND: 2-2-BT-MH-E-3-RG-HP 8/27/90 FINISH REAMING/WASHING T/BOTTOM W/BIT #20. 10510~ T/10917~. DRLG F/10917~ T/11090~ W/BIT #20. CHECKED F/FLOW, NONE. DROP SURVEY. POH. BTM 5 STDS TIGHT, BUT WORKED THRU W/OUT ROTATING. MOTOR RUN WAS IN GOOD CONDITION THIS TRIP. (10002~ UP T/SHOE AT 9797~) TEST CHOKE MANIFOLD WHILE POH. TEST BOPE AT REPORT TIME. BIT #20 COND: 4-5-BT-H-E-2-CT/RG-TQ 8/28/90 FINISH TESTING BOPE. MAKE UP BHA; CHNGED SLEEVE ON 1ST NM STAB, INSTALLED A "METAL-X" TYPE NB STAB. TIH FILLED PIPE AT 5000~ AND AT SHOE ON WAY IN HOLE. PRECAUTIONARY REAMED 60~ T/BOTTOM, NO PROBLEM. DRLG F/11090~ T/11292~ W/BIT #21. CHECKED F/FLOW, NONE. SHORT TRIP T/SHOE. 1ST 4 STDS HAD TO BE WORKED UP/DOWN SEVERAL TIMES BUT ROTATING WASN'T REQURIED TO POH T/SHOE. MOTOR RUN STILL IN GOOD CONDITION FOR TRIPPING. DRLG F/11292~ T/11323~ W/BIT #21. 8/29/90 DRLG F/11323~ T/11354~ W/BIT #21. WORK UP THRU TIGHT HOLE AT 11306~. CHECK F/FLOW, NONE. DROP SURVEY INST~S. POH, WORK OUT OF TIGHT HOLE 1ST 4 STDS. slm/O30491A. MAKE UP NEW BHA. TIH T/SHOE; FILLED PIPE AT 5000'. FILL PIPE AT SHOE WHILE CDL 80'. TIH T/11268', NO PROBLEMS GOING IN THE HOLE. PRECAUTIONARY REAM 86' T/BOTTOM. (11354') DRLG F/11354' T/11463' W/BIT #22. BIT #21COND: 6-6-BT-MH-F3-I-CT-TQ. NOTE; #3 CONE BARELY HANGING ON. 8/30/90 DRLG F/11463' T/11529' W/BIT #22. CHECK F/FLOW, NONE. SHORT TRIP T/SHOE. TIGHT SPOTS AT 10777' & 10225'. DRLG F/11529' T/11687' W/BIT #22. CHECK F/FLOW, NONE. POH F/NEW BIT. ENCOUNTERED TIGHT HOLE AT 11220' AND 10823'. UP REAMING OUT AT REPORT TIME AT 10792'. 8/31/90 CONTINUE POH. P/U KELLY & REAM UP THROUGH TIGHT SPOTS @ 10598', 10538' 10470' & 10195'. VERY TIGHT HOLE CONDITIONS. MIX/PUMP PILL @ CSG SHOE. POH W/BIT #22 ASMY. P/U & TIH W/BIT #23 BHA, FILL PIPE @ 5000' & 9700', TIN T/10383'. TIN T/11717'- WORK PIPE & REAM W/KELLY AS REQUIRED THRU TIGHT SPOTS @ 10383', 10492', 10524', 10583', 10808', 11665'. DRILL 8.5" HOLE W/BIT #23 ASMY F/11687' T/11717'. P/U TO MAKE CONNECTION. UNABLE TO P/U ABOVE 11670'. WORK PIPE & BACK REAM W/KELLY @ 11670', REPORT TIME. BIT #23 COND: 8.8.WT.A.E.4.BT.HR 9/01/90 WORK PIPE & BACK REAM HOLE @ 11670'. OBSERVE 600# LOSS IN PUMP PRESSURE. CHECK ALL SURFACE EQUIPMENT. DROP CARBIDE PILL. WORK PIPE, BACK REAM W/SLIPS, TSA DRIVE BUSHING AND KELLY F/11670' T/11639'. POH TO LOCATE SOURCE OF PRESSURE LOSS. POH F/11639' T/10383'. WORK PIPE F/10383' T/lO291'.SUSPECT MULTIPLE KEYSEAT CONDITIONS EXIST THERE IS NO SIGNIFICANT INDICATION OF DIFFERENTIAL STICKING CONDITIONS PON T/9700' (IN CSG).. SECURE RIG FLOOR FOR TRIP. POH WET, LOOKING FOR WASHOUT. BIT #23 BODY WASHED OUT DUE TO INCORRECT JET INSTALLED. P/U BIT #24, CHANGE #2 STAB, P/U KEYSEAT WIPER. TIH W/BIT #24 ASHY. BIT @ 2450', REPORT TIME. 9/02/90 TIH W/BIT #24 ASHY TO CSG SHOE. STOP & FILL PIPE @ 5229' & SHOE. REPAIR/REPLACE ROTARY TABLE BACK BRAKE. TIH T/11683'. OBSERVED SIGNIFICANT PIPE PRESS. LOSS WHILE WASHING LAST 35' OF HOLE CHECK SURFACE SYSTEM. POH W/WET PIPE & LOCATE WASHOUT 12 STDS UP, 24" BELOW BOX CONN ON S-135 PIPE. P/U KELLY & MONITOR PIPE PRESSURE. TIH T/11717'~, DRILL F/1171 T/11854'. WORK TIGHT HOLE AS REQUIRED. LOST POWER TO #3 & #4 GENERATORS. ~ORK PIPE. RESTORE POWER. SHORT TRIP & WORK TIGHT HOLE @11776', REPORT TI~E. BIT #23 COND: 2.2.CT.M.E.I.NO.WO 9/03/90 SHORT TRIP W/BIT #24 ASHY. VERY TIGHT THRUOUT TRIP. 11705' BAD SPOT DRILL 8.5" HOLE F/11854' T/11916'. VERY TIGHT @ 11820'. WORK PIPE THRU BAD SPOTS.MINORINDICATIONS OF DIFFERENTIAL STICKING TORQUE APPROACHED MAXIMUM LEVEL @ 11916'. WORK PIPE. SHORT TRIP. VERY TIGHT @ 11806'. REAM BACK TO BOTTOM. slm/O30491A. DRILL 8.5" HOLE F/11916' T/11954'. DRILL AHEAD @ REPORT TIME. 9/04/90 DRILL 8.5" HOLE W/BIT #24 F/11954 T/11978'. APPROACHING MAX ROTARY TORQUE. PREPARE TO SHORT TRIP & POH FOR LOGGING. SHORT TRIP, WORK PIPE IN TIGHT SPOT F/11978' T/11806'. PIPE BECAME STUCK @ 11828' WHILE WORKING PIPE ON UP STROKE. WRK STUCK PIPE. NO JAR ACTION. UNABLE TO ROTATE OR RECIPROCATE STRING MOBILIZE BACKOFF CREW & FISHING TOOLS. SUSPECT KEYSEAT CONDITIONS. R/U & RIH W/DIALOG FREE POINT & STRING SHOT TOOL. LOCATE FREE PIPE @ 10810', APPROXIMATELY 9 JTS INTO HWDP. WRK 7.5 TURNS OF LEFT HAND TORQUE DOWN DRILL STRING. PIPE PREMATURELY BACKED OFF. POH W/FREE POINT/STRING SHOT, RIH COLLAR LOCATOR/STRING SHOT. CONFIRM PIPE BACKED OFF @ 10651' (10551' OF DP, 1KEYSEAT WIPER, 2 JTS HWDP, 275,000# OF STRING UP WEIGHT). POH & STAND BACK DIALOG. MONITOR WELL, POH INSIDE CSG @ 9329' SLIP & CUT 80' DRILL LINE, CHANGE RO~ARY SWIVEL PACKING, SERVICE ROTARY TABLE & RIG @ REPORT TIME. FISH IN HOLE: TOF @ 10561'. 34 JTS HWDP, UP JAR, I JT HWDP, DN JAR, (ESTIMATED) : I JT HWDP, 3 PT ROLLER RMR, XO, 2 SDC, STAB, NMLC, : NBSTAB, BIT #24 : 1177'. 9/05/90 CUT & SLIP 80' OF DRILL LINE. REPACK KELLY SWIVEL SEAL ASMY, SERVICE RIG. CONTINUE POH. L/D RECOVERED FISH; KEYSEAT WIPER, 2 JTS OF HWDP. P/U FISHING BHA & TIH TO CSG SHOE. REPLACE RHEOSTAT IN DC PANEL FOR GENERATOR #4. TIH & TAG TOP OF FISH @ 10624' DPM. SCREW INTO FISH, JAR DOWN ON FISH. ALTERNATE JAR ON FISH. NO SUCCESS. WORK PIPE, MIX & PUMP 136 BBL 17# BALANCED PILL ACROSS FISH F/11822' (BIT DEPTH) TO 10600'. R/U DIALOG, RIH W/FREE POINT/STRING SHOT COMPOSITE TOOL. LOCATE CLEAR FREE POINT 10780'. WORK 7.5 TURNS OF LEFT HAND TORQUE IN PIPE. FIRE SHOT W/NO IMMEDIATE LOSS IN DP TORQUE. PULL FREEPOINT/SHOT TOOL UP HOLE. RELEASE DP TORQUE, DID NOT RECEIVE ANTICIPATED TORQUE BACK. WORK PIPE TO COMFIRM BACKOFF STATUS @ REPORT TIME. FISH IN HOLE:BIT, METAL-X STAB, NMLC, STAB, 2 SDC, 3 PT ROLLER REAMER 1JT HWDP, DN JAR, 1JT HWDP, UP JAR, 34 JTS HWDP = 1211.89' 9/06/90 POH W/DIALOG FREE POINT/STRING SHOT TOOL. WORK PIPE TORQUE, OBSERVE BACKOFF. RIH W/FREE POINT & STRING SHOT #2. LOCATE BACKOFF ABOVE SCREW-IN SUB IN FISHING ASMY. SCREW BACK INTO FISH. LOCATE FREE POINT 4 JOINTS BELOW SCREW-IN SUB, INDUCE LEFT HAND TORQUE, FIRE SHOT @ 10781' (WLM). OBSERVE BACK OFF. POH W/DIALOG. POH T/CSG SHOE & R/D DIALOG. POH W/FISH ASMY. CONFIRM RECOVERY OF 4 JTS HWDP. L/D SAME. TEST BOPE CHOKE MANIFOLD AND AVAILABLE SURFACE SYSTEM WHILE POH. TEST BOPE: PULL BORE PROTECTOR, TEST VARIABLE PIPE RAMS, REPLACE FAILED RAMS W/5" PIPE RAMS. TEST PIPE & BLIND RAMS, FLOOR & SAFETY VALVES; U/L KELLY VALVES; KILL/CHOKE/HCR/CHOKE MANIFOLD VALVES @ 250#/5000#. TEST ANNULAR PREVENTER @ 250#/3500#. PERFORMNACE & TIME TEST ACCUMULATOR SYSTEM. INSTALL BORE PROTECTOR. L/D FISHING ASMY FROM DERRICK. slm/O30491A. PREPARE TO SET CEMENT PLUG FOR SIDETRACK; P/U 15 JTS OF 3.5" 9.3# TBG W/STINGER ON 5" DP. TIH & TAG TOF @ 10740~. CIRCULATE/CONDITION & PRETREAT MUD FOR CEMENT CONTAMINATION @ 10737~. R/U HOWCO CEMENTING UNIT, HOLD CREW SFTY MTG, PRESS TEST LINE 93000# PUMP 40 BBLS FRESH WATER AHEAD OF 36.3 BBL SLURRY, CONSISTING OF: 200 SKS "G" MXED W/0.5% CFR-3 + 0.35% HR-7 @ 16.6# 4.0 g/sk, l.2 cf/sk CHASE W/3 BBLS FW, DISPLACE W/181BBLS OF 11.1# DRILL MUD (BAL PLUG). CIP 0300 HRS 09/06/90. POH TO 9747~ INSIDE CSG. REVERSE CIRC 1.5 TBG VOLUME. R/U & RESTRING FULL LENGTH OF DRILL LINE (NEW SPOOL OF LINE) WHILE WOC. NOTE: FNAL FISH LOST IN HOLE; BIT#24, METAL-X STAB, NMLC, STAB, 2 SDC XO, 3 PT ROLLER REAMER, 1JT HWDP, DN JAR, I JT HWDP, UP JAR, 30 JTS HWDP : 1091~ : RECEIVED VERBAL APPROVAL FROM BLAIR WONDZELL OF AOGCC FOR PLUG BACK AND SIDETRACK PROGRAM @ 1615 hrs 09/05/90. 9/07/90 WOC. STRING NEW DRILL LINE, REPLACE ROD ON #1 MUD PUMP. SERVICE RIG. WAIT ON WEATHER: BOAT UNABLE TO LOAD & TRANSFER MUD MOTOR BHA DUE TO HIGH WINDS @ DOCK AREA. POH & L/D CEMENT STINGER ASMY. OFFLOAD BOAT, RECEIVE BHA. P/U BHA W/BIT #25, 30 JTS HWDP. P/U 6 JTS "G" PIPE. TIH T/9797~, WORK PIPE TO STAGE DRILL PIPE GRADES. TIH, PIPE STOPPED @ 10160~ P/U, MOVE & STAND BACK PIPE. P/U ON PIPE. PIPE STUCK @ 10155~. WORK & JAR ON PIPE @ REPORT TIME. 9/08/90 WORK STUCK PIPE @ 10155~. JAR ON STUCK PIPE WITH NO OBSERVED MOVEMENT. PIPE CAME FREE. SUSPECT COAL @ MUD MOTOR OR OLD FISHING KEYSEAT. POH W/MOTOR ASMY. L/D 66 JTS DP, STAND BACK MOTOR ASMY. P/U BIT #18RR W/CLEAN OUT BHA. TIH & FILL PIPE T/CSG SHOE. P/U SINGLES, WASH & REAM HOLE. MANY SIGNIFICANT TIGHT SPOTS @ COALS. TAG TOP OF CEMENT (SOFT) @ 10578~.DRILL FIRM CEMENT W/IOK# DW, 0.5'/m TOP OF POLISHED PLUG FOR KICKOFF IS 10625'. 9/09/90 DRILL/POLISH TOP OF PLUG @ 10625~, CBU. POH. TRIP OUT TO SHOE WAS GENERALLY SMOOTH. P/U & TIH W/BIT #25, MUD MOTOR, MWD BHA FOR K/O ASSEMBLY. ORIENT BHA. DRILL W/MUD MOTOR FOR KICK OFF F/10625~ T/10694~@ REPORT. BIT #18RR COND: 3.3.BT.A.E.2.CT.BHA 9/10/90 DRILL SIDETRACK W/BIT #25, MUD MOTOR & MWD ASMY F/10694~ T/10715~. PUMP PILL, POH. P/U HWDP, L/D 12 JTS OF DP. L/D MUD MOTOR & MWD. SERVICE KELLY ASMY & RIG. M/U BIT #26 BHA. TIH T/10616~. P/U KELLY, WASH & REAM MOTOR RUN F/10625~ T/10715~. DRILL W/BIT #26 ASMY F/10715~ T/10876~. DROP SS SURVEY. CHECK FOR FLOW, PUMP PILL, SHORT TRIP TO SHOE FOR SURVEY RECOVERY. BIT # 25 COND: 1.1.NO.A.E.I.NO.BHA 9/11/90 SHORT TRIP T/SHOE FOR SURVEY RECOVERY. RETRIEVE SURVEY W/WIRELINE. TIH T/10876~. EVALUATE SURVEY DATA. DRILL W/BIT #26 ASMY F/10876~ T/10890~. POH FOR BHA CHANGE. TIH W/BIT #27 BHA. STOP & FILL PIPE @ 5120~ & 9720~. slm/O30491A. SLIP & CUT 100' OF DRILL LINE, CHECK CROWN-O-MATIC. TIH T/10840', P/U KELLY & REAM TO 10890'. DRILL W/BIT #27 ASMY F/10890' T/11044'. DROP SS SURVEY. STAND BACK KELLY. SHORT TRIP T/SHOE FOR SURVEY RETRIEVAL @ REPORT TIME. 9/12/90 POH T/SHOE. L/D 9 JTS DP. TIGHT HOLE F/10350' T/10108', COALS. RETRIEVE SS SURVEY. MONITOR WELL FOR FLOW. TIH T/10108~, WASH & REAM W/SINGLES T/10350'. COALS. TIH T/10703~, WASH & REAM AS REQUIRED T/11043~. COALS. DRILL 8.5" HOLE W/BIT #27 F/11043' T/11207'. DROP SS SURVEY. POH TO TOP OF HWDP @ 1300'. R/U & RIH W/WIRE LINE TO RETRIEVE SURVEY. PREPARE TO TEST BOPE. 9/13/90 RETRIEVE SURVEY. POH. L/D - STAND BACK BIT #27 BHA. TEST BOPE: TEST CHOKE MANIFOLD/VALVES, FLOOR VALVES, U/L KELLY VALVES DART, HCR, KILL LNE VALVES, PIPE/BLIND RAMS @ 250/5000#. TEST ANNULAR PREVENTER @ 250/3500#. 3" CHOKE LINE VALVE FAILED. REPLACE/TEST. TIME/FUNCTION TEST ACCUMULATOR. RESET BORE PROTECTOR. MAKE UP BIT #28 BHA; DBS TB16 DIAMOND BIT W/NEYRFOR T3A TURBODRILL TIH W/BIT #28 ASMY STOP & FILL PIPE @ 4900' & 9820'. (FILLED PIPE AT LOW PRESSURE & MOVED PIPE TO AVOID DAMAGE TO CASING FROM TURBO/BIT) TIH, TAG TIGHT SPOT @ 9830'. P/U KELLY & REAM SECTION T/10071' S/B KELLY. TIH, P/U KELLY, WASH & REAM, S/B KELLY @ FOLLOWING ~ECTIONS F/10112' T/10223' F/10298~ T/10408~ 10545' T/BOTTOM @ 11207'. THE BHA PRESENTS ~1' +/- OF "LOCKED ~P" ASSEMBLY. CONSEQUENTLY THE PRIMARY PROBLEM WITH TIH IS A DIFFERENT BHA NOT NECESSARILY DETERIORATING HOLE CONDITIONS. PREPARE TO DRILL W/BIT #28 @ REPORT TIME. BIT #27 COND: 3.3.CT.MH.E.I.WT.BHA 9/14/90 FINISHED REAM/WASH T/BOTTOM; 11207'. DRLG F/11207' T/11448' W/BIT #28. 9/15/90 DRLG F/11448' T/11456' W/BIT #28. DROP DUAL SINGLE SHOT SURVEY INST. PULLED T/SHOE. RECOVERED SURVEYS W/WIRELINE TOOL. TIH. HAD TIGHT SPOT AT 10438' ON WAY OUT. DRLG F/11456' T/11504' W/BIT #28. DROPPED DUAL SINGLE SHOT INST'S TO CONFIRM DIRECTION. HAD A VARIANCE OF 5 DEG ON 1ST SURVEYS DROPPED. (USED NEW COMPASS) SLM OUT OF HOLE. (NO CORRECTION) LAYED DOWN TURBINE ASSMY. MAKE UP ROTARY ASSMY. TIH AT RPT TIME T/REAM OUT MOTOR RUN. BIT WAS 1/2" OUT OF GAGE, STABS ON TURBINE WERE 1/4" UNDER GAGE. THE TWO SLEEVE TYPE STABS ABOVE TURBINE WERE 1/8" UNDER GAGE. BIT #28 COND: 8-8-LT-NSG-X-8-WT-PR 9/16/90 FINISH TIH T/TOP OF TURBINE RUN AT 11207'. REAM OUT TURBINE RUN F/11207~ T/11504' W/BIT #29. DRLG F/11504~ T/11700~ W/BIT #29. 9/17/90 DRLG F/11700' T/11760' W/BIT #29. CHECKED F/FLOW, NONE. POH W/BIT #29. MAKE UP BIT #30, TIH W/BHA. CHANGED WASH PIPE/PACKING IN SWIVEL, TEST OK. slm/O30491A. TIH T/SHOE AT 9797'. CDL 100', TIH T/10967'. REAM BRIDGES, 10967'-11108' AND THEN 60~ T/BOTTOM. DRLG F/11760' T/Il811' W/BIT #3O. BIT #29 COND: 7-8-WT-MH-E-2-BT-PR/HR 9/18/90 SWIVEL PACKING BEGAN LEAKING. PULLED T/SHOE. REPLACED SWIVEL PACKING/WASHPIPE. COULD NOT FIND ANY OBVIOUS REASON FOR PREMATURE FAILURE. TIN T/BOTTOM. DRLG F/11811~ T/11871~. SWIVEL PACKING FAILED AGAIN. HAD SWIVEL FROM ONSHORE BROUGHT OUT WHILE POH W/BIT #30. CHANGED OUT SWIVELS. PRESSURE TEST SWIVEL. OK. THIS SWIVEL IS FROM PLATFORM "A" RIG; WAS STORE AT THE ONSHORE FACILITY. IT IS A NATIONAL MODEL P-400. TIH W/BIT #23RR T/11841~. REAM 30~ T/BOTTOM. DRLG F/11871~ T/11896' W/BIT #23RR. BIT #30 COND: 7-8-BT-MH-E-2-CT-RR 9/!9/90 DRLG F/11896' T/12091' W/BIT #23RR. 9/20/90 DRLG F/12091' T/12145' W/BIT #23RR. TD. CIRC/COND F/LOGS. PON T/11350'. ENCOUNTERED TIGHT HOLE, WORK AT TIGHT HOLE. SET ON SLIPS AT 11367', PICKED UP KELLY T/CONTINUE WORKING THRU TIGHT HOLE. PIPE STUCK W/NO JAR ACTION. CIRC/WORK STUCK PIPE WHILE MOBILIZING DIA-LOG/FISHING TOOLS. RIG UP DIA-LOG, RAN FREEPOINT/STRING SHOT. FREE PIPE AT 10812'. WORK DOWN LEFT HAND TORQUE, SHOT AT 10812~. NO BACKOFF. PON W/WIRELINE. SHOT DID FIRE. ATTEMPT BLIND BACKOFF W/NO SUCCESS; WANTED TO ADD A 10' PUP BELOW ROTARY TABLE TO GET A TOOL JNT OUT OF THE SLIP SETTING AREA THAT WAS HAMPERING BACKOFF ATTEMPT. MAKE UP STRING SHOT #2, RAN IN HOLE. WORKED DOWN LEFT HAND TORQUE, HAD BACKOFF. CHECKED W/COLLAR LOCATOR, 10632', JUST BELOW SEAT WIPER. POH W/WIRELINE, RIG DIA-LOG ASIDE. POH AT RPT TIME. NOTE: RECIEVED VERBAL APPROVAL FRM MR. LONNIE SMITH OF AOGCC TO DEFER BOPE TEST AT THIS TIME. 9/21/90 FINISHED POH. RECOVERED ALL 5" DP AND KEY SEAT WIPER. TOF AT 10632'. MAKE UP TRI-STATE FISHING TOOLS, TIH T/10632', SCREW INTO FISH. CIRC THRU 1 JET/JAR DOWN ON FISH. OTHER JET PLUGGED. RIH W/DIA-LOG, UNABLE TO GET PAST 9990~. POH W/WIRELINE. RIG ASIDE. WORK LEFTHAND TORQUE DOWN F/BACKOFF. GOT BACKOFF BELOW 9990~ POH, FOUND BENT JTS DP AT 9990' AREA. LAYED DOWN 9 JTS, FINISH POH. BACKOFF WAS AT THE SCREW-IN SUB. TIH W/SCREW-IN SUB ASSMY, CHECKING EVERY CONN FOR TIGHTNESS ON WAY IN THE HOLE. 9/22/90 SCREW INTO FISH AT 10632'. JETS ARE PLUGGED, UNABLE TO CIRC/COND MUD. RUN IN HOLE W/DIA-LOG SPUD JARS/CHISEL BIT. HNGNG UP AT 11342'. PULL LOOSE AT 9K PULL.(SURFACE TENSION) POH, LAYED DOWN CHISEL BIT. RIH W/2" O.D. STAR BIT/HYD JARS/MECH JARS T/TOTCO RING IN TOP OF NB STAB. POH. RIH W/5 2 1/8" CERAM JET PERF SHOTS AND PERF LEAD COLLAR F/11355' 11359~ DP MEASUREMENTS. POH, RIG DIA-LOG ASIDE. KELLY UP AND ESTABLISH CIRC THRU PERFS. CIRC/COND MUD TO OBTAIN 10.0 PPG MUD WEIGHT. slm/O30491A. CHECKED F/FLOW, NONE. MIXED 3 DRUMS TORQUE TRIM II WITH 100 BBL MUD. SPOTTED 66 BBLS OUTSIDE, CALC 11355~ UP T/10632~. 34 BBLS REMAINS IN DP TO MOVE PILL OCCASIONALY. JARRING DOWN ON FISH AT REPORT TIME W/700 AMPS OF RIGHT HAND TORQUE. 9/23/90 JAR DOWN ON FISH. RIG DIA-LOG FREEPOINT AND 14 STRNG SHOT. RIH FREEPOINT HWDP. STUCK AT 10812~ FREE TOOL JT AT 10786~. MADE BACKOFF AT 10786~. POH, RIG ASIDE. CHECKED F/FLOW, NONE. POH. RECOVERED XO SUB, 5 JTS HWDP. MAKE UP 62~ OF WASHPIPE/SHOE ON BUMPER SUB/JARS, 9 DC~S. SHOE IS A CRIPPLED SCALLOPED TYPE. SMOOTH I.D. ROUGH BTM/O.D. 8.25" X 6.5" TIH W/WASHPIPE ASSMY. WORK OVER TOP OF FISH AT 10786~ AND WASHOVER T/10827~ AT RPT TIME. 9/24/90 WASHOVER FISH AT 10827~. SHOE QUIT MAKING HOLE. CHECKED F/FLOW, NONE. POH T/SHOE. PUMPED PILL, POH. SHOE WAS WORE OUT. CNG SHOE. TIH. WASHOVER F/10827~ T/10850~ CIRC/COND UNTIL HAD BOTTOMS UP. 50 UNITS ~AS. CHECK F/FLOW, NONE. POH. SHOE HAD BEEN ALNG SIDE FISH INSTEAD OF OVER THE FISH. MAKEUP SCREW-IN ASSMY. TIH. SCREW INTO FISH AT RPT TIME 9/25/90 SCREW INTO FISH AND JAR. JARS BEGAN TO STICK, LOOSING JAR ACTION. GOT THEM FREE. WORK PIPE TO KEEP FISHING STRING FREE WHILE MIX/SPOT 17 PPG PILL ACROSS FISH. RIG DIA-LOG. MADE BACK OFF AT SCREW-IN SUB. HWDP BELOW WAS STUCK. CHECK F/FLOW, NONE. POH. LAYED DOWN FISHING ASSMY. PICKED UP 15 JTS OF 3.5" TBG STINGER, XO, TIH T/10773~. CLEAN PIT FOR CMT MIX WATER WHILE CIRC/COND F/CMT. 9/26/90 CIRC/COND F/CEMENT AT 10773~. RIG HOWCO LINES, TEST T/2000 PSI. OK. PUMP 109 BBLS FRESH WATER AHEAD OF 400 SX (73 BBLS SLURRY) + .5% CFR-3 + .35% HR-7. 16.7 PPG, 4.0 GAL PER SX. FOLLOWED W/3 BBLS FRESH WATER BEHIND. DISPLACED W/180 BBLS OF 10.0 PPG MUD. PULLED T/SHOE. REVERSE 1.5 DP VOLS. POH T/TOP OF "G" PIPE. PICKED UP 58 JTS OF REBUILT "G" PIPE. POH TO USED "G" PIPE AND CULLED 57 JTS THAT NEEDS REBUILDING/HARD BANDING. FINISHED POH W/DP. LAY DOWN 15 JTS 3.5" TBG CEMENTING STINGER. TEST BOPE. CLEANING PITS/BLDING NEW MUD SYSTEM WHILE POH AND TESTING BOPE. CHANGED OUT ROTARY CHAIN. CHANGED OIL IN CHAIN CASE AND TRANSMISSION. CONTINUE BUILDING MUD VOL. MAKING UP BHA AT RPT TIME. EST. TOP OF CEMENT AT 10588~. RECIEVED VERBAL APPROVAL 0830 NR$ 09/24/90 FROM MR. BLAIR WONDZELL OF AOGCC TO PLUG BACK WELL. 9/27/90 SLM IN HOLE T/SHOE. LAY DOWN 15 JTS DP. TIH, TAG BRIDGE AT 10249~. PICK UP KELLY. REAM F/10249~ T/TOP OF CMT AT 10494~ DRLG 6~ FIRM CMT. CIRC/COND AT 10500~. POH T/SHOE. DISPLACE KCL MUD W~NEW MUD W/O KCL. CUT DRLG LINE 100~. SPOT HI-VIS PILL T/END OF DRILL PIPE. TIH T/10500~. CIRC/COND OLD MUD FROM OPEN HOLE W/HI-VIS SWEEP. MAX GAS UNITS : 253. CHECKED F/FLOW, NONE. POH F/MUD MOTOR/KICKOFF ASSMY. LAY DN EXTRA DP. slm/O30491A. 9/28/90 M/U DRILLEX D675 MUD MOTOR, 1.75d BENT SUB & ANADRILL MWD W/BIT #25RR BHA FOR KICKOFF ASMY. TIH; SURFACE TEST MOTOR & MWD TOOLS, FILL PIPE @ 5100', TAG TOP OF PLUG @ 10500'. ORIENT KICKOFF ASMY. DIRECTIONALLY DRILL & SURVEY KICKOFF W/BIT #25RR BHA. BIT #25 COND: 1.1.NO.E.1.NO.BHA 9/29/90 DRILL & SURVEY KICKOFF W/MUDMOTOR & MWD (BIT #25RR BHA) F/10500' T/10686' CHECK FOR FLOW, POH W/BIT #25RR. L/D DRIL~ PIPE FOR REAMING OF MOTOR RUN. L/D MWD & MOTOR ASMY. M/U & TIH W/BIT #31BHA. FILL PIPE @ 5000' & SHOE. REAM MOTOR RUN F/10500' T/10658' @ REPORT TIME. BIT #25RR COND: 2.3.ER.A.E.2.NO.BHA 9/30/90 REAM MOTOR RUN T/10686'. NO FILL ON BOTTOM OBSERVED. DRILL W/BIT #31 BHA F/10686' T/10996'. DROP SS SURVEY. POH T/CSG @ 9700'. RIH W/SLICKLINE & RECOVER SS INSTRUMENTS. TRIP FOR BHA CHANGE. M/U BIT #32 BHA. FILL PIPE @ 9768'. WORK ON #5 399 CAT GENERATOR ENGINE. BIT #31 COND' 2.2.CT.2H.E.I.ER.BHA 10/01/90 REPAIR #5 ENGINE OVERSPEED & SHUT DOWN SYSTEM. TIH W/BIT #32 BHA. P/U KELLY & REAM TIGHT HOLE SECTION F/10195' T/10275'. TIH F/10275' T/10740'. P/U KELLY & REAM F/10740' T/10996'. NO FILL ON BOTTOM OBSERVED. DRILL F/10996' T/11043'. HOLE CONDITION APPEARS GOOD ON CONNECTIONS. ROTARY DRIVE CHAIN FROM MOTOR TO TRANSMISSION BROKE. POH T/CSG @ 9700' REPAIR/REPLACE SECTION OF ROTARY DRIVE CHAIN CAUSED BY KEEPER FAILURE. TIH T/11043'. NO FILL OBSERVED. DRILL W/BIT #32 ASMY F/11043' T/11187'. OBSERVE LOSS IN MUD PUMP PRESS CHECK SURFACE SYSTEM. MUD BECAME EXCESSIVELY FOAMED DUE TO PRESENCE OF TORQUE TRIM IN SYSTEM AND DESILTER JETTING ACTION. SPOT TREAT PITS W/ALUM. STEARATE. UNABLE TO PURGE/PRIME PUMP SUCTION SIDE. BEGIN OPENING UP SUCTION TO CLEAR AIR LOCKED MUD. PREPARE TO DROP SS SURVEY AND POH T/CSG. @ REPORT TIME. 10/02/90 PRIME SUCTION END OF MUD PUMPS IN EFFORT TO RESTORE PUMP PRESSURE. DROP TANDEM SS SURVEY IN DRILL PIPE. POH T/SHOE FOR SURVEY INSTRUMENT RECOVERY. RETRIEVE SS SURVEY INSTRUMENTS. CONFIRM PUMP PRESS @ SURFACE IS GOOD. POH WET WHILE LOOKING FOR DRILL STRING WASHOUT. LOCATED LATERAL SPLIT AT BOX END OF HWDP 385' ABOVE BIT. L/D 2 JTS HW. L/D TOTAL OF 9 JTS HWDP & 3 PT RMR FROM BHA. M/U BIT #33 BHA. TIH, STOP & FILL PIPE @ 4900' & 9700'. SLIP & CUT 100' OF DRILL LINE. TIH, P/U SINGLES, REAM F/11137' T/11187'. NO FILL, GOOD TIH T/BOTTOM. DRILL W/BIT #33 BHA F/11187' T/11336' INTO HI-HK FORMATION. BIT #32 COND: 2.2.CT.A.E.I.NO.WO 10/03/90 DRILL 8.5" HOLE W/BIT #33 F/11336 T/11587'(HN). slm/O30491A. DROP SS TANDEM SURVEY. POH T/TOP OF HWDP. TIGHT (MODERATE) @ 10673-10121', 9834' (OLD HOLE). RETRIEVE SS SURVEY INSTRUMENTS, POH. L/D MONEL DRILL COLLARS. TEST BOPE: TEST ALL SURFACE\CHOKE\SAFETY VALVES, MANIFOLD, PIPING, KELLY @ 250\000#. TEST PIPE\BLIND RAMS @ 250#\5000#, ANNULAR PREVENTER @ 250\3500#. PERFORMANCE TEST ACCUMULATOR. COMPLETING BOPE TEST @ REPORT TIME. PREPARE TO M/U BIT #34. BIT #33 COND: 3.4.BT.HA.6.3.ER.HR. 10/04/90 TEST BOPE: PULL TEST PLUG/RESET BORE PROTECTOR. M/U BIT #34 BHA, TIH, STOP & FILL PIPE @ 5000' & SHOE. TIH T/11500'. HOLE CONDITION WHILE TIH WAS GOOD. P/U KELLY & REAM TO BOTTOM @ 11587'. NO FILL OBSERVED. DRILL W/BIT #34 ASMY F/11587' T/11818' (HR FORMATION). 10/05/90 DRILL W/BIT #34 ASMY F/11818' T/11853' SHORT TRIP T/11290'. TIGHT @ 11378' & J1530'. DRILL F/11853' T/11857'. POH W/BIT #34 T/CSG SHOE. TIGHT (MODERATE) F/11280-11010' F/10700-010' TRIP FOR BIT. P/U BIT #35 BHA, TIH, FILL PIPE @ 5053' & CSG SHOE. TIH T/11807'. TIGHT @ 11640'. P/U KELLY & REAM F/11807' T/11858'. DRILL W/BIT #35 F/11858' T/11864'. OBSERVE DROP IN PUMP DISCHARGE PRESSURE. CHECK SURFACE EQUIPMENT ADD DEFOAMER TO CONTROL MUD. PRIME CHARGE PUMPS. CHANGE CENTER SWAB, 4 VALVES & 2 SEATS IN MUD PUMP #1. PRIME MUD PUMP SUCTION. DRILL F/11864' T/11892' IN HZ FORMATION @ REPORT TIME. BIT #34 COND: 8.7.BT.A.E.2.LT.PR 10/06/90 DRILL W/BIT #35 F/11892' T/11919'. ENCOUNTR TIGHT HOLE @ CONNECTION. WORK TIGHT PIPE UPHOLE TO GET ABOVE BAD SPOT T/11775'. UNABLE TO WORK PIPE FURTHER UP HOLE. P/U TSA PIPE DRIVE BUSHING AND ATTEMPT TO UP REAM TIGHT SPOT WITH NO SIGNIFICANT SUCCESS. REAM TO BOTTOM @ 11919'. DRILL F/11919' T/12045'. WORK TIGHT CONNECTIONS AS REQUIRED. CIRCULATE & CONDITION HOLE IN PREPARATION TO LOG. POH TO LOG. 10/07/90 POH TO LOG F/12045'. PULL TIGHT @ 11848'. WORK TIGHT SPOT. P/U TSA PIPE DRIVE BUSHING, UP REAM F/11848' T/11833'. POH T/11772'. TIGHT SPOT, UNABLE TO WORK THROUGH THIS INTERVAL. P/U TSA PIPE DRIVE BUSHING, UP REAM F/11772', T/11770'. NO GAIN. R/D PIPE DRIVE BUSHING. REAM HOLE TO BOTTOM @ 12045'. BRIDGE @ 11910'. DRILL W/BIT #35 F/12045' T/12140' FOR EXTENDED RATHOLE. CIRCULATE & CONDITION HOLE FOR LOGS W/40 BBL 200 VIS SWEEP. R/U DIALOG WIRELINE IN DERRICK. R/U & RIH W/DIALOG CCL & JRC 2" DRILL COLLAR EXPLOSIVE SEVERING TOOL. RECIPROCATE PIPE WHILE RIH, LOCATE TOP OF XOSTAB @ 103' FROM BIT. P/U ON DRILL STRING AND LOCATE BIT 3' ABOVE BOTTOM @ 12137'. POSITION & FIRE SEVERING TOOL. P/U ON STRING & OBSERVE 75,000# REDUCTION IN UP WEIGHT. RECIPROCATE PIPE WHILE POH W/DIALOG CCL ASMY. POH W/FISH INTO CSG. ENCOUNTER TIGHT SPOTS OFF BOTTOM (KEYSEATS). slm/O30491A. R/D DIALOG, MIX & PUMP PILL. POH W/FISH. >>>>: ESTIMATED TOP OF FISH = 12036~ 10/08/90 POH W/FISH. CONFIRM FISH RECOVERED/LOST IN HOLE AS LISTED ON DAILY DRLLG REPORT 10/07/90. TOP OF FISH (EST) @ 12036~ R/U ATLAS WIRELINE, LOG W/DIL/BHCAL/GR/SP/CT F/12020~ T/97~7~. HOLE CONDITIONS NOT FAVORABLE FOR EXTENDED LOGGING PROGRAM. R/D ATLAS WIRELINE. R/U DIALOG WIRELINE, RIH W/CASING CALIPER. TOOL FAILED @ 9600~. PON & REHEAD, RIH & LOG F/9750~ T/WELLHD SPOOL. CASING WEAR INDICATED REPOSITION HWDP IN DERRICK TO FACILITATE RUNNING LINER. HOLD SAFETY MEETING WITH ALL CREWS INVOLVED IN RUNNING CASING. INSTALL BAKER PLUG DROP HEAD ASMY UNDER UPPER KELLY VALVE. R/U & RUN 7" LINER, INSTALL TORQUE STOP RINGS, INSTALL CENTLZRS AS REQ TORQUE CONNS FOR 7" X 32# @ 13M#, 7" X 26#, 29# @ 1OM#. L/D I BAD JT. M/U BAKER FLEX-LOCK RH HS HANGER ASMY TO DRILL PIPE. R/D TONG CREW, R/U & CIRCULATE PIPE. RIH W/7" LINER ASMY ON 5" DP. STRAP & RABBIT DRILL PIPE AS RIH. RIH @ 4427~, REPORT TIME. 10/09/90 RIH W/7" LINER: 75 JTS + 3 FLAG JTS & HANGER ON DRILL PIPE T/9550~ IN 9 5/8" CSG. STRAP & RABBIT DP (SEE 7" LINER DETAIL ON PAGE #2). ESTABLISH TORQUE & DRAG PRAMETERS IN CSG FOR RECIP/ROTATE CSG PROGRAM RIH W/7" LINER STRING T/12039~. MANY LEDGES AND TIGHT SPOTS OBSERVED, BEGIN TO RECIPROCATE LINER @ 20~ STROKES. UNABLE TO ROTATE LINER. OBSERVE INCREASED RESISTANCE TO RECIPROCATE LINER, SET LINER @ 12039~. CIRCULATE & CONDITION HOLE, PRETREAT MUD FOR CEMENT JOB. UNABLE TO ROTATE/RECIP LINER WHILE CIRCULATING. R/U & RUN CEMENT: HOLD SAFETY MEETING W/ALL PARTICIPATING PERSONNEL. PUMP 5bbls FRSH WATER (FW) AHEAD, TEST LINES @ 5000#, PUMP 45 bbls FW FOLLOW W/318 bbls CEMENT SLURRY CONSISTING OF 1500 SX PREMIUM G CMT, MIXED W/0.4% HALAD 344, 0.25% HR7, @ 15.5#/gal YIELD @ 1.19 cf/sk, DROP DP WIPER PLUG, CHASE W/lO bbls FW, 148 bbls OF MUD. ENCNTER PROBLEM W/LINER WIPER PLUG. DP WIPER PLUG ENGAGED LINER PLUG WHICH DID NOT MOVE, BUILD & SURGE PRESS ON LNR WIPER PLUG T/5000#. PLUG WLD NOT MOVE. R/U TO EMERGENCY RELEASE FROM HANGER. PULL ON RUN TOOL (FREE), RESET RUN TOOL, REGAIN FLUID DISPLACEMENT. CONTINUE TO DSPLACE CEMENT W/108 bbls OF MUD. BUMP PLUG W/2000#. PLUG HELD/NO FLW CIP @ 1930 hrs. STAND BACK KELLY POH 12 STANDS, REVERSE CIRCULATE MUD, NO CEMENT RETURNS OBSERVED. POH W/HGR RUN TOOL. M/U KELLY. P/U & TIH W/CENT CLEAN OUT ASMY. R/U TO SLIP & CUT 100~ OF DRILL LINE. C22A-26 7" LINER DETAIL DESCRIPTION FROM TO JOINTS F/SHOE-BAKER G 12039 12037 32# P-110 12037 11998 1 F/COLLAR-BAKER DVFC 11998 11997 - 32# P-110 11997 11958 2 LNDG COLLAR-#2 11958 11920 - 32# P-110 11920 11656 7 32# P-110 FLAG 11656 11636 - 32# P-110 11636 11338 8 32# P-110 FLAG 11338 11319 - slm/O30491A. 32# P-110 11319 11012 32# P-110 FLAG 11012 10995 32# P~110 10995 10691 29# L-80 10691 10280 26# L-80 10280 9002 HANGER - BAKER 9002 8989 FLEX-LOCK HYD SET TOTAL = 3039' 8 8 10 31 -- 75 FULL JOINTS 3 FLAG JOINTS MISC. JEWELRY OTHER: 10 TURBO CENTRALIZERS RUN F/11612' T/11256~ 27 STAND OFF CENTRALIZERS RUN (PRIMARILY IN PAY ZONE) 03 ALUMINUM STANDOFF CENTRALIZERS RUN IN LINER LAP SECTION LINER HANGER HYDRAULICALLY SET WITH PIPE IN TENSION. TOP OF LINER HAS BEEN TAGGED, CONFIRM DEPTH OF LINER IS CALCULATED @ 12039~, TOP OF LINER HANGER @ 8989'. PLEASE NOTE THIS ADJUSTMENT. 10/10/90 SLIP & CUT 100~ OF DRILLING LINE. SERVICE RIG. TIH & TAG TOP OF LINER @ 8989'. NO CEMENT FOUND ABOVE HANGER. CIRCULATE BOTTOMS UP TO PURGE AIR FROM MUD. POH 2 STDS, SHT PIPE RAMS, PRESSURE TEST LINER LAP @ 3100# FOR 30 min LAY DOWN BHA & 5" DRILL PIPE. NIPPLE DOWN BOPE, FLOW LINES, PULL RAT/MOUSE HOLES. R/U & PULL RISER. SET CIW/WKM WELLHEAD ON AP SPOOL. PREPARE TO MOVE RIG. 10/11/90 CONTINUE TO RIG DOWN CHOKE, MUD, AND FLOW LINES. PREPARE TO MOVE RIG. WELL IS SECURED WITH PRODUCTION TREE & OPEN TO GAUGE FOR PRESSURE MONITORING. WELL CONTAINS 10# GENERIC #2 MUD. RIG RELEASED TO C33-26 P & A @ 1200 hrs, 10/10/90. 12/25/90 RIG ACCEPTED @ 0500 HRS, 12/24/90 FROM C13A-23. R/U & SKID RIG TO WELL SLOT. PULL PRODUCTION TREE, NIPPLE UP DRLLG RISER & BOPE, FLOW & CHOKE LINES. TEST BOPE PER SHELL SPM & AOGCC SPECS. ALL TESTED WELL EXCEPT THE ANNULAR PREVENTER, WHICH FAILED ON THE 3.5" DP. R/U & ATTEMPT TO UNSCREW TOP OF HYDRIL GK ANNULAR PREVENTER. UNABLE TO TO UNSCREW WITH LEVERAGED ASSEMBLY FOR ELEMENT CHANGEOUT. MOBILIZE REPLACEMENT UNIT @ REPORT TIME. 12/26/90 CONTINUE EFFORTS TO REMOVE BONNET ON HYDRIL GK ANNULAR PREVENTER. MOBILIZE & RECEIVE SECOND UNIT. REMOVE & REPLACE HYDRIL GK UNIT. BOPE TEST: TEST HYDRIL ANNULAR PREVENTER ON 3.5" & 5" DP @ 250#/3500#. RESET BORE PROTECTOR. M/U & TIH W/BIT #30 TO DRILL & CLEAN OUT CEMENT. TAG & DRILL OUT PACKOFF BUSHING @ 8994~. CIRCULATE OUT GAS AND H2S GAS @ 82 ppm . SUSPECT GAS GENERATED BY STATIC LIGNOSULFONATE MUD. TIH & ROTATE SPACED 6" STRING MILL THROUGH PACKOFF BUSHING @ 8994'. TIH & TAG WHAT APPEARED TO BE A BARITE BRIDGE @ 11763'. P/U KELLY & WASH THROUGH BRIDGE. (BRIDGING & LIGHT SPOTS INDICATE BARITE FALLOUT). TIH & TAG FIRM CEMENT @ 11870'. DRILL CEMENT F/11870' T/11914~ DPM. LOCATE LANDING COLLAR W/LINER WIPER PLUG @ 11914' DPM. CIRCULATE & CONDITION UNBALANCED MUD IN PREPARATION FOR CSG PRESSURE TEST. slm/O30491A. 12/27/90 CIRCULATE & CONDITION MUD FOR LOGGING. R/U & TEST 9 5/8" & 7" CASING @ 3100#. TEST FAILED. POH W/BIT #36 C/O ASMY. R/D FLOW NIPPLE, R/U WIRELINE LUBRICATOR FLANGE X 7" RISER. R/U ATLAS WIRELINE & TEST LUBRICATOR @ 1200#. RIH WITH SBT/GR/CCL CORRELATED W/DIL/BHCAL/GR LOG. P/U @ 11854' WLM, MAINTAIN 1050# ON CSG, EXPERIENCE VDL TOOL FAILURE. POH W/LOG TOOLS. RIH W/SBT/GR/CCL RUN #2. AVOID SETTING TOOL ON BTTOM DUE TO SUSPECTED JUNK THAT MAY HAVE INTERFERED WITH RUN #1. P/U & LOG @ 11820'. MAINTAIN 1050# ON CSG WHILE LOGGING. LOG F/11820' T/TOL @ 8989'. LOG INDICATES LITTLE CEMENT IN LINER LAP SECTION. R/U & RUN GYRODATA DIRECTIONAL WELL SURVEY @ REPORT TIME. 12/28/90 RUN GYRO SURVEY W/ GYRO DATA SERVICES ON ATLAS WIRELINE. RIG DOWN LOGGERS. NIPPLE'DOWN HYDRIL FLANGE. - NIPPLE UP DRLG. NIPPLE. MAKE UP BIT AND 7" SCRAPER - TIH - MAKE UP 9 5/8" SCRAPER - TIH SCRAPE 7" CSG TO 11,903~ AND 9 5/8" TO 8989'. CIRC. HOLE CLEAN. TOOH W/ SCRAPERS. PICK UP (1) STD. 3 1/2" DP AND 7" CHAMP PACKER (RTTS) - TIH TO 9040'. BREAK CIRC. - SET PACKER AND PRESSURE UP ON 7" CSG. TO 3500 PSI FOR 10 MIN. - BLEED PRESSURE AND PUMP PILL. TOOH W/ 7" PACKER. LAY DOWN 7" AND PICK UP 9 5/8" RTTS. FAXED COPY OF CEMENT BOND LOG TO PAUL HUCKABEE, ANCH. OFFICE. MAILED COPY OF GYRO TO ED UNGER, ANCH. OFFICE. 12/29/90 TIH W/ 9 5/8" RTTS TO 8900'. CIRC. DRILL PIPE VOLUME. TEST CMT. LINES TO 6000 PSI. - SET RTTS - PRESS. 5" X 9 5/8" ANNULUS TO 500 PSI. - ESTABLISH INJECTION RATE W/ HOWCO PUMP. - PUMPED 10 BBL @ 1 3/4 BBL/MIN @ 2500 PSI, PUMPED 5 BBL @ 3 BBL/MIN. @ 2600 PSI. - AFTER SHUTTING DOWN PRESSURE BLED TO 1700 PSI. - TEST 9 5/8" CSG. FROM SURFACE TO 8900' TO 2500 PSI FOR 5 MIN. - BLEED PRESSURE & OPEN RTTS. - CEMENT (HALIBURTON PUMPED 30 BBL. H20, 33 BBL. CMT. (160 SXS) W/ .27% 344, .2% CFR-3, & 1% HR7. 1.15 CU/SX, 15.8 #/GAL., 3 BBL. H20, & 112 BBL. MUD. - CLOSE RTTS - PUMP 48 BBL MUD (HESITATED LAST 4 BBL) FINAL PRESSURE 1800 PSI - BLED BACK 7 BBL. BLEED 5" X 9 5/8" ANNULUS & PULL 5 STDS. REVERSE OUT I 1/2 DP VOLUMES. (NO CMT) TOOH W/ RTTS. PICK UP 8.5" BIT AND SCRAPER - TIH TO 8085' SLIP & CUT 100' DRLG. LINE. - CHECK & TIGHTEN BRAKE PAD BOLTS. - RE- PAIR 4" STD. PIPE VALVE. TIH - TAG CMT. @ 8860' (9.5 BBLS. ON TOP OF LAP) PICK UP KELLY & CLEAN CMT TO 8989'. (TOL) £IRC RIG UP & TEST CASING & LAP TO 3100 PSI FOR 30 ~IN. PUMP PILL & TOOH LAY DOWN 6 1/4" DC & (2) 5" HWDP. - PICK UP 5 7/8" BIT & SCRAPER. 12/30/90 TIH W/ 5 7/8" BIT & 7" SCRAPER. - TAG CMT @ 7" LINER TOP. DRLG. CMT. FROM 8989' TO 9033'. (44') (1.7 BBL.) TIH TO 11,914'. CIRC TEST CSG. & LAP TO 31~0 PSI FOR 30 MIN. (GOOD TEST) CIRC. slm/O30491A. SAFETY MEETING - (PICKING UP AND LAYING DOWN TUBULARS) LAY DOWN 112 JTS. 5" SNGL. GROOVE S135, 115 JTS. 5" DBL. GROOVE S135, 77 JTS. 5" G, & 94 JTS. 3.5" 13.30 DRILL PIPE. MAKE UP 5 7/8" BIT & 7" SCRAPER. - STRAP, DRIFT, & PICK UP 3.5" 9.3# 8RD EUE TUBING W/ AB MODIFIED COUPLINGS. slm/O30491A. Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 January 9, 1991 Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99501 Commission Gentlemen: SUBJECT: SUBMISSION OF GYRODATA DIRECTIONAL SURVEY C13A-23 AND C22A-26 Enclosed are the Gyrodata Directional Survey Reports Well C22A-26. If you have any questions regarding contact Susan L. Murnan at (907) 263-9614. Very Truly Yours, W. F. Simpson Manager Regulatory Affairs Alaska Division WFS~slm Enclosures REPORT FOR WELLS for Well C13A-23 and this report, please RECEIVED 01099 l~gyro~sbbm A G¥~od~t~ Direotion~l Survey Report SHELL WESTERN EXPLORATION AND PRODUCTION INC. LOCATION : PLATFORM FIELD : MIDDLE GROUND SHOAL WELL : C2'2A - 26 (SLOT 30) Gyrodata Job Number : ASi290G259 G¥~od~t~ Survey Rapo'et Chronology Monday Deoembe~ 2A Tuasday Daoember, 25 S[andby on P!a[for. m ' C ". Wednesday December. 26 I~:~0 Replacement Elect~onics ar,~r, ive fr. om Anchor-a~e. A function test shows nor-mal operation. i~:O0 Atlas Wi~.~iine_ commence Bond ~og~. Thu'~,sday Decembe~ n~ 03:0r~ A+las_ como'eta, · their. Lo~so . Rig-,~p~ Gyr, odata Equipment on the Catwalk. 03:~5 Cab!ahead on Tool, Power. on - ali functions nor-mai. Await Gyro temper-etude set. 04:i0 Ze~o on sub-face and Run in Hole. 07:30 Toot at i!800 Feet. Commence Out~-un Sur-vey. 08:~5 Rezero Gyr. o on surface. Note wiFeline discpepancy of !0 Feet. 09:00 Bpeak down ~oot and sto~e fo~ shippin~ back to shot, e, !0:30 Ppesent SuPvey to Shell Company RepFesentative, !3:00 Gl/r-odata Engineer-~ depa~-t f~om Shell P!atfo~m " C " by hal icopter- end-cute to Kenai, Page ! A Gyrodata Direct iona I Survey for SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORM "C" MIDDLE GROUND SHOAL - WELL :- C22A-26 (SLOT 30) LOCATION: 38:18 FEL & 24!4 FNL OF SEC 26, TBN, R!3W A.S.P. Date Run: 27-DEC-90 O~.:!O:O0 Job Number: AKi290G259 Surveyor: T. STODDARD/J.C. STUART Calculation Method: MINIMUM CURVATURE Survey Latitude: 60.7640deg N Azimuths Corrected 1.3100deg EAST to Grid North Proposed Well Azimuth: 22i,4000fleg Vertioai Section Calculated from Well Head Location Closure Calculated from We!! Head Location Horizontai Coordinates Calculated from Local Horizontal Reference Gyrodat~ Directiona! SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORH %" MIDDLE GROUND SHOAL - WELL :- C22A-26 (SLOT 30) , LOCATION: 3848 FEL & 24i4 FNL OF SEC 26, TBN, R13W A.S.P. Job Number: AKi2906259 Survey Page MEAS iNCL AZ!HUTH VERT DEPTH DEPTH ft deg deg fi HORIZONTAL COORDINATES feet VERT SECTION ft DOG-LEG SEVERITY des/tO0' .0 !10.0 2i0.0 3!0.0 410.0 · O0 . O0 .0 .00 N .00 E Al! Depths Are Referenced To .36 8.87 1!0.0 .34 N .05 .!2 221.59 210.0 .57 N .03 · 61 242.23 3!0.0 .25 N .5t 1.34 !95.76 410.0 1.12 S 1.30 510.0 2.!0 i92.75 6!0.0 3.28 205.90 710.0 4.73 217.36 8~ ~. ~u 0 6.05 218.32 9!0.0 7.63 211.94 I010,0 9,60 207,54 iii0.0 i!.89 204.!i 1210.0 I3.47 202.44 1310,0 i5.03 204.02 * ~ 53 14!0.0 i6.56 zOo. 15!0.0 !7.94 207.37 16!0,0 19.44 207.74 i710.0 20.98 209.57 !8i0,0 22.84 2i0,49 !9!0.0 24.99 2!2.24 20!0.0 26,88 2t4.I0 2110.0 27,56 213.98 2210,0 27.88 215.!0 23!0,0 28.75 2!6,15 24!0,0 30.11 215.76 509.9 4.04 S 2.02 609.8 8.40 S 3.68 709.6 14.25 S 7.43 809,1 2t,67 S 13,20 908.4 3!,44 S 19.98 i007.3 44.47 S 27.35 !105.5 6!.27 S 35.4t 1203.! 81.44 S 44.07 1300.0 I04.05 S 53.79 t396.2 128.75 S 65.21 i491.7 155.29 S 78.43 !586.5 183.69 S 93.26 1680.3 214.00 S 109.84 t77~,! 246.30 ~ 128.53 1864,5 280.89 S 149.64 1954.4 317.48 S 173.59 2043.3 355.38 S i99,19 2131.9 393.69 S 225.57 22!9.9 432.24 S 253.20 2307.0 472.01S 282.05 -.3 ,I !.7 4.4 8.7 15.6 25.0 36.8 51.4 69.4 90.2 113.6 !39.7 168.3 199.5 233.2 269.7 309.7 352.9 398.3 444.5 491.7 540.6 .00 ,33 .46 .5i 1.02 .77 1.32 1.65 t.33 1.75 2.08 2.37 1.62 1.6t 1.58 1.49 1.50 1.67 1.88 2.27 2.06 ,68 .61 i.00 1.38 Gyroda!a SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORM "C" MIDDLE GROUND SHOAL - WELL :- C22A-26 (SLOT 30) LOCATION: 3848 EEL & 2414 FNL OF SEC 26, TSN, Ri3W A.S.P. Job Number: AKI290G259 Survey Page MEAS iNCL AZIMUTH VERT DEPTH DEPTH ft deg deg ft HORIZONTAL COORDINATES feet VERT SECTION f~ DOG-LEG SEVERITY deg/lO0' 25t0.0 31.33 215.84 2393.0 z~l~.O 32.25 216.57 2477.9 2710.0 32.90 215.99 2562,2 ~,~.0 34.02 2t6.4i 2645.6 29!0.0 34.90 216.90 2728.! 30i0.0 35.86 2!8.35 2809.6 3I!0.0 37.00 218.5! 2890.1 32!0.0 38.19 218.88 2969.3 3310.0 39.63 219.92 3047.1 34!0.0 40,88 2f9,89 3!23.4 3510.0 42,24 220.05 3198.3 36!0.0 42,80 220.59 3272.0 3710.0 42,56 220.75 3345.5 3810,0 42.58 22i.40 34!9.1 39t0.0 42,32 220.74 3492,9 40i0,0 42,42 220.40 3566.8 4!!0.0 42,~z ~=..o~f 02 3640.8 4210.0 42.34 221.16 3714.8 43t0.0 43.26 222.37 3788.2 44!0,0 42,47 221.35 386!.5 45!0.0 42.91 222.65 3935.0 4610.0 42.65 223.18 4008.4 47!0.0 42.93 223.93 4081.8 48!0.0 4t,93 225.03 4155.6 49!0.0 42,71 224,85 4229.5 513.44 S 311.93 W 555.95 S 343.06 W 599.35 S 374.92 W 643,85 S 407.49 W 689.24 S 44t,27 W 735,09 S 476.61 781,61S 5!3,53 829.23 S 551.67 877.76 S 59t.54 927.33 S 633.00 978.17 S 675,6! 1029.70 S 719,34 1081.12 S 763.53 1!32,11 S 807,97 1183.00 S 852.31 1234.!9 S 896.14 W !285.t7 S 940.0! W 1335.83 S 984.18 W 1386.50 S i029.44 W 1437.16 S !074.84 W t487.54 S **=~,~°n 2! W 1537.28 S 1166.46 W 1586.51 S 1213.27 W 1634.65 S 1260.53 W !682.31S 1308.09 W 591.4 643.9 697.5 752,4 808,8 866.6 925.9 986.8 1049.6 11!4.2 1180.5 1248.1 1315,9 t383.5 i451.0 t518.4 1585.7 1652.9 i720,8 1788,8 t856.6 1924.5 1992.4 2059.8 2127,0 1.22 t.O0 .72 1.14 .92 1.28 1.15 1.21 1.58 t.25 1.36 .68 .26 .44 .5t .24 .50 .23 1.24 1,06 .99 .44 .58 1.25 .79 Gyrodata Directional SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORM "C" , MIDDLE GROUND SHOAL - WELL :- C22A-28 (SLOT 30) · LOCATION: 3848 FEL & 24!4 FNL OF SEC 26, TSN, Ri3W A.S.P. Job Number: AKI290G259 Survey Page MEAS !NCL AZIMUTH VERT DEPTH DEPTH ft deg deg fi HORIZONTAL COORDINATES feet VERT SECTION ft DOG-LEG SEVERITY deg/lO0' 50!0.0 40.82 220.36 4304,! 5110.0 40.41 215.17 4380.1 5210.0 40.57 214.64 4456.1 5310.0 40,59 213.23 4532,1 54!0.0 41,24 212,86 4607,7 5510.0 4i.37 213,3! 4682,8 56!0,0 41.i8 212.!7 4757,9 57!0,0 41.30 212.46 4833. t 58!0.0 42,43 213.40 4907,6 59i0.0 43,88 214.16 4980.5 60i0.0 44.64 214.03 5052,2 6110.0 45,45 215,20 5122,8 6210,0 46.57 215,34 5192,3 6310,0 48,08 2!6.47 5260,! 64!0.0 48.94 217,80 5326,3 6510,0 48,95 217,6i 5392.0 66i0.0 48.10 217.82 5458,2 6710,0 48.45 217.73 5524.8 68!0.0 48.41 217.78 5591.1 6910.0 47,77 218.06 5657.9 70!0,0 48, 06 2i7.83 5725,0 7110.0 47.50 2!8,61 5792.2 7210.0 46.79 219,31 5860, 2 73!0, 0 45,97 ~19.07 5929.2 7410.0 44.86 219. II 5999.3 173!,27 S f353, t8 1782,69 S t393,03 1835,93 S 1430,19 1889,90 S t466,50 I944,80 S 1502.21 ,-,'~000,10 S 15~8. -'5 2055.58 S 1573.93 2111.29 S 1609.17 2!67.30 S !645,45 2224. I5 S !683, 48 228!,94 S 1722.61 2340,17 S 1762,81 2398.91 S 1804.35 2458.45 S !847.47 2518,15 S 1892,70 2577,82 S t938,82 2637,09 S !984,65 2696.08 S 2030.37 2755.23 S 2076, I8 2813,93 S 2!21,9t 2872.46 S 2167.55 2930,63 S 2213,36 2987.64 S 2259,45 3043,75 S 2305.20 3099,03 S 2350.11 2t93,5 2258,4 2323,0 2387.4 24.52,2 2517.6 2582,8 2647.9 2713.9 2781.7 2850,9 2921,2 2992,7 3065,9 3140,6 3215.8 3290,6 3365.1 3439.7 35t4.0 3588,1 3662.0 3735,3 3807.6 3878.8 3.53 3,40 .38 .92 ,70 .32 .?8 .23 i.29 1.54 ,76 1.!6 1,12 1,72 !.32 .15 .87 .36 .06 .67 .34 .80 .87 .84 1,I1 Gyrodata Direotional SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORM "C" , MIDDLE GROUND SHOAL - WELL :- C22A-26 (SLOT 30} LOCATION: 3848 FEL & 24i4 FNL OF SEC 26, TgN, RI3W A.S.P. Job Mumber: AK!290G259 Survey Page 4 MEAS INCL AZIMUTH VERT DEPTH DEPTH ft deg deg ft HORIZONTAL COORDINATES feet VERT SECTION ft DOG-LEG SEVERITY deg/lO0' 7510.0 42.38 219.43 6071,7 7610.0 39.99 22!.15 6147.0 7710.0 35.82 220.68 6225.9 7810,0 33.00 222.09 6308,4 7910.0 31,04 222.69 6393,2 80i0.0 27.9! 223.22 6480.2 8I!0.0 25.32 222.42 6569,6 8210.0 21.93 225.84 6661.2 8310.0 !7.78 229,41 6755.2 84t0.0 t4.04 227.43 6851.4 8510,0 ii.ii 222.2! 6949.0 86t0.0 9.!8 222.54 7047.4 87t0.0 7.46 235.06 7146.4 8810.0 5.62 233.02 7245,7 89!0.0 3 0v ~' , . ~.97 7345,4 90!0,0 2.49 252,05 7445,3 9t10.0 5,19 295,67 7545.1 92!0.0 7,74 312,81 7644,5 93i0.0 o~. 4! 325.93 7~*~.,~. 4 9410.0 10,65 337.53 7841,8 9510.0 12.33 351.10 7939.8 96t0.0 !4.50 356.66 8037.1 9710.0 16.99 !.26 8133.4 9810,0 i7,78 5,84 8228,8 99i0.0 17,92 22.65 8324.0 3152,43 S 2393,76 3202,67 S 2436,32 3249,08 S 24.76,56 3291.49 S 2513,89 3330.65 S 2549.63 3366.67 S 2583.!6 3399,52 S 26t3.62 3428.32 S 2641.45 3451,27 S 2666.44 3469.42 S 2686,98 3484.76 S 2702,39 3497.78 S 27t4,26 3507,38 S 2724.98 35i4.05 S 2734,2i 3518,98 S 2739,92 3521.64 S 2743,77 3520,35 S 2749.9t 3513,82 S 2758,92 3502,47 S 2768,~4 3487, i6 S 2776,55 3468,08 S 278t,73 3445,03 S 2784. tl 3417.91S 2784,52 3388.t1 S 2782,65 3358.7t S 2775,16 3947.7 4013.5 4074.9 4131.4 4184.5 4233.6 4278,4 4318,4 4352,2 4379.4 4401,1 4418,7 4433.0 4444,1 4451.6 4456.1 4459,2 4460,3 4458,0 4451,9 44ai,0 4425,3 4405.3 438!,7 4354.7 2,49 2.64 4.18 2.93 1.98 3, t4 2.62 3,66 4,32 3,78 3,!4 1.93 2.49 1.85 2.68 1.55 3.79 3.17 2,56 2,37 3,t7 2.53 2.79 1,58 5.!4 Gyrodata Directional SHELL WESTERN EXPLORATION & PRODUCTION INC. PLATFORM "C" , MIDDLE GROUND SHOAL - WELL :- C22A-2G (SLOT 30) LOCATION: 3848 FEL & 24i4 FNL OF SEC 26, TBN, R13W A.S.P. Job Number: AKI290G259 Survey MEAS INCL AZIMUTH VERT DEPTH DEPTH ft deg deg ft HORIZONTAL COORDINATES feet VERT SECTION ft DOG-LEG SEVERITY deg/lO0' I00!0.0 o~ ~ ~,~ 4!.92 8418.0 10!10.0 23.77 44.68 8509.9 10210.0 26.01 43.01 8600.6 i03iO,O 28,83 45.79 8689,4 104!0,0 32.58 49,18 8775,3 I05!0,0 36,95 49.29 8857,5 10610.0 35.75 56.21 8938.0 10710.0 37,74 63.98 9018.2 10810.0 4!.29 65.53 9095.3 109i0.0 44,26 65.31 9t68.7 11010.0 46.80 66,29 9238.8 11110.0 46,63 67,31 9307.4 11210.0 47.43 67.57 9375.5 11310.0 48.22 68.64 9442.7 11410.0 48.87 70,07 9508.9 !i5t0,0 49,68 70,59 9574.! 11610.0 48,38 72,94 9639,7 I!710,0 45.97 75.38 9707.7 it8i0.0 43,09 75.90 9778.9 3330.21 S 2756.4! 330!.62 S 2729.44 3271.25 S 2700,31 3238.40 S 2668.05 3203.9? S 2630.38 3166.74 S 2587,19 3!30.88 S 2540.11 3101.19 S 2488,30 3074.09 S 2430.75 3045.84 S 2369.00 30!6,60 S 2303.9t 2987.92 S 2237.01 2959.85 S 2169.43 2932.21S 2100.67 2905.80 S 2030.54 2880,29 S t959.18 2856.66 S 1887.48 2836.62 S 1816.94 2819.22 S 1749.01 4320,9 4281,6 4239,5 4193.6 4142.8 4086.4 4028.3 3971.8 3913.4 3851,4 3786.4 3720.6 3654.9 3588.7 3522,5 3456.2 3391,0 3329.3 327t.4 8.04 1.65 2.35 3.!0 4.13 4.36 4,27 5.05 3.68 2.98 2,63 ,76 .82 1,12 1.25 ,90 2,20 3,00 '~ 90 Final Station Clo~ure: 33-17,7 feet 21i,8150 degree~ PERMIT # ..../ca _ AOGCC GEOLOGICAL MATERIALS iNVENTORY LiST ~':/ WELL NAME COMPLETION DATE / !?_~__/ ,P'/ CO. CONTACT ,~',~'./.// _/'~_~..r check Off 'or li~t data' al" ii i~ 'reieived.*list received date 'for 407. if not required list as NR cored intc~als core analysis ~A d~ ditch inte~ais ' d~i'ial data .......... LOG '"'-'nc,, r-,_ i RUN ,,,,'"'""':n"A'°, ,..nw,_o SCALE ' NO. ,{to thc ncarest foot} {inchll · ~i, w/e ..... t ///VY--//z/e,o .... d-' s~ wa~ .... / ,,, ,~?~,~,_//j'ooo' , 10! ~! ...... _ ~u . . i81 ........ 1 ?] .................. ............. ! , , , ! , RETAIN THIS SECTION FOR YOUR RECORDS &~ _~.~-;~ ~ ~-~ C ~n ('"~' 2 2 ~ '~L~ ~ ~ - ~ft b~ PRINTS ____ NEG. ___~ .... SEPIA ~-~RPD~ G~. ~L~PRINTS .... NEG .... L ..... SEPIA ____ PRINTS _____ NEG ...... SEPIA ____ PRINTS ____ NEe ....... SEPIA ~ PRINTS ~ NEG .... SEPIA ~ PRINTS ~¢~, ~ ,: .,.. ~...~EPIA ABOVE RECEIVED FROM: ATLAS WmELINE ATTENTION ~.~ L~':L: 2 2 "_._ ~fl~.5 .~^,. ~.~s s~c~o. ~o. YOU..~co.os I~'~ DUAL INDUCTION ~ PRINTS [~A'~MINILOG · _ , PRINTS ~i~ ~EO~NTED BOND ~ ~HC ACOUSTILOC !~,~ BOREHOLE PROFILE PRINTS_~ J~,~ ~ENS ILOG PRINTS ~ j~,~j DuAL INDUCTION I~ ~ SPECT~Oc PRINTS ABOVE~ECEIVED FROM: ATLAS WI ATTENTI~ · SIGNED .~ ~ * DATE NEG ..... NEG ..... NEG ...... NEG. NEG .... NEG .... NEG. NEG. SEPIA SEPIA SEPIA __ SEPIA ___ SEPIA SEPIA SEPIA SEPIA STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 (907) 279-1433 TO: RE: Receipt of the following material which was transmitted via is hereby acknowledged: QUANT I TY DESCRI PT I ON RETAIN THIS SECTION FOR YOUR RECORDS RE C22A-26 ACOUS:r :I OO DUAL INDUCTION~[~/~ DUAL INDUCTION, FOCUSED ~:~OV 0 4~; t~q~ PRINTS ABOVE RECEIVED ATTENTION 1 PRINTS 1 NEG.__ 1 PRINTS 1 NEG.__ 1 PRINTS 1 NEG.__ NEG.__ NEG.__ NEG.__ NEG.__ NEG.~ SEPIA SEPIA SEPIA SEPIA SEPIA SEPIA SEPIA SEPIA RECE I VED: DA TED: Copy sent to sender YES NO Shell Western E&P Inc.Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 August 23, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen' SUBJECT- SUBMITTAL OF AN APPLICATION FOR SUNDRY APPROVAL TO CHANGE THE APPROVED PROGRAM FOR DRILLING MIDDLE GROUND SHOAL WELL C22A-26 Enclosed please find three copies of an Application for Sundry Approval to Change the Approved Program for Middle Ground Shoal well C22A-26. The drilling program change involves setting the 9-5/8" casing deeper than originally planned. You will notice on the form 10-403 that Dave Johnston approved the change in casing depth on August 15, 1990. Attached to the form 10-403 is the revised casing design criteria which includes the new casing setting depth for the 9-5/8" string. If you have any questions, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosures \AOGCC\082390. DOC RECEIVED Alaska Oil& Gas Cons. STATE OF ALASKA ALAE.. OIL AND GAS CONSERVATION COMM,dSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend __ Alter casing Repair well __ Change approved program X_.~. ,2. Name of Operator SHELL WESTERN E&P INC. 3. Address 601 West Fifth Avenue, Suite 800 Anchorage, AK 99501 4. Location of well at surface Platform C, Leg 4, Conductor 30 At top of productive interval 3843' FEL & 2414' FNL of SEC. 26~ TBN, R13W At effective depth At total depth 3217' FEL & 2414' FNL of SEC. 26, T8N, R13W OperatiOn shutdown __ Re-enter suspended well Plugging Time extension Stimulate Pull tubing __ Variance ~erforate__ Other __ 5. Type of well: 6. Datum elevation (DF or KB) Development X 105' KB Exploratory Stratigraphic 7. Unit or Property name Service Middle Ground Shoal 8. Well number C22A-26 9. Permit number 90-63 10. feet API number 50-T53-20415 ,, Field/Pool Middle Ground Shoal, "G" Pool 12. Present well condition sum~nary Total depth: measured true vertical Effective depth: measured true vertical 9797 9797 feet Plugs (measured) feet feet Junk (measured) feet Casing Length Structural Conductor 370' Surface 1155' Intermediate Production Liner Perforation depth: measured N/A true vertical N/A Tubing (size, grade and measured depth) N/A Packers and SSSV (type and measured depth) N/A Size 24" 13-3/8", 54.5#, K-55 Cemented 660 SX "G" Measured depth True Vertical Depth 1155' RECEIVED AUG 2 71990 · '~.,~!~.~ Oil & Gas Cons. ~0mmissio~ Anchora~~ ~ 13. Attachments Description summary of proposal X__ Detailed operations program__ BOP sketch __ 14. Estimated date for commencing operation August 15, 1990 16. If proposal was verbally approved Name of approver: Dave Johnston 8/15/90 Date approved 15. Status of well classification as: Oil __ Gas Suspended __ Service .. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~/~. F ~ Title Manager Regulatory A~fairs Date 8/23/90 For Commission Use Only Conditions of approval: Notify commission so representative may witness Plug integrity__ BOP Test __ Mechanical integrity Test __ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required 10--7 ORIGINAL ,SIGNED BY Approved COPY R~turne~ ~~Date i.,vlelwll.. ~./, ~,./!¥1! !11 \081590 SUBMIT IN TRIPLICATE C22A-26 CAS ING DESIGN Casing Design Criteria Frac Gradient Pressure Gradient Max Collapse Pressure Max Burst Pressure Projected Mud Weight 13-3/8" 9-5/8" 0.57 psi/ft 0.79 psi/ft 0.467 psi/ft 0.467 psi/ft 537 psi 3836 psi (Full evacuation) (Full evacuation) 1279 psi 3700 psi (1/3 BHP @ 9-5/8" csg pt) (Injection pressure) 9.6 Ppg 9.6 ppg 1! 0.571 psi/ft 10000 psi (Frac pressure) 10000 psi (Frac pressure) ]1.0 ppg ACI.UAL DESIGN CONDITION Size Depth Weight Grade/ (ppf) Coupling Buoyed Tension Collapse (lbs) (psi) Burst (psi) Casing Rating / Design Factors Tens i on Col 1 apse Burst (kips) (psi) (psi) 13-3/8" 9-5/8" 11 0- 1155 ' MD 0 - 1150 ' TVD 0- 4168 ' MD 0 - 3679 ' TVD 4168- 9797 ' MD 3679 - 8213 ' TVD 9497 - 10780 ' MD 7924 - 9070 ' TVD 10780- 12178 ' MD 9070 - 10036 ' TVD 54.5 K-55 BTC 43.5 L-80 LTC 47.0 L-80 LTC 26.0 L-80 LI'C 32.0 P-110 LTC 53,786 319,453 157,559 16,480 (22,472) 537 1,279 1,718 3,700 3,836 3,700 5,178 3,7OO 10,000 10,000 853 / 10+ 825 / 2.58 905 / 5.74 519 / 10+ 897 / N/A 1131 / 2.11 2817 / 2.20 3693 / 2.15 6769 / 1.83 4806 / 1.25 6683 / 1.81 5442 / 1.05 7159 / 1.93 10858 / 1.09 12120 / 1.21 RRW/PROGCSG 08/16/90 15:42 RECEIVED SWEP! PiGS "C" AUG 1 5 UIl & Gas Cons. Commission Anchorage ALASKA OIL & GAS COMMISSION ANCHORAGE, A~ASKA AUGUST 15, 1990 1 ~130 hrs. C22A-26 on f~~ nc. l, ~"COuntered dtre~.~ ~.~o~mi depth Of "~;~ -~n. ~ ~iOnal concerns ~'~ . We have review our casing Point. that have prompted us to Per ~PI Permit to Drill #50-7~3-20~].5, we request approval to drill beyond the Permitted depth of 9~?. to a new 9.625- ca~i~g ~ot~t of ~e are currently tripping to condition the hole for logging and c~in~, Shell Western ru~u~t~ a variance for the Weekly BOPE test due this da~ until the 9,62§- casin9 is set and cemented ( anticipated late 8/16 or 08/~7/90 ). The BOPE Will be tested prior to drilling out the casing float or shoe. I can be reached b~ phone at'776-52~! or 263-968! at your Convenience. Thank You. Chris Willoughby Drilling Platform C, ~iddle ~ound Shoal, Cook IDler cc: RRW well files · Shell Western E&P Inc. 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 August 1, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupi ne Drive Anchorage, A1 aska 99501 Gentlemen' SUBJECT: SUBMISSION OF THE WELL COMPLETION OR RECOMPLETION REPORT AND LOG FOR MIDDLE GROUND SHOAL WELL C-LINE Enclosed in duplicate is the Well Completion or Recompletion Report and Log for Middle Ground Shoal well C-Line. Plug and abandonment activities began on June 24, 1990 and were completed on July 17, 1990. The rig was released to Well C22A-26 on July 17, 1990. This should complete the reporting for the C-Line well. If you have any questions regarding this report, please contact Randy Wagner at (907) 263-9632 or Val Jones at (907) 263-9614. Very Truly Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/vj Enclosure DRILL ING~C-L INEt080190. DOC ~ay 23, 1990 Telecopy ~ (907)7.76-7542 Mr, Wayne F. Simpson Division Operations Manager Shell Western E&P Inc, Fi~th Avenue, 601 W. ~ Suite 810 Anchorage, Alaska 99501-2257 Re: Middle Ground Shoal C22A-26 Shell Weste~ E&P Inc. Permit No. 90-63 Sur, Loc Platform "C" Leg 4 Conductor 30 Btn~hole Loc. 3217'FEL, 2414'FNL, Sec. 26, TSN, R13W, SM. Dear Mr. Si~son: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other 'Il required permittz g dete~inations are made. The Commission wtli~-.advtse you of those BOPE tests that it wishes to witness. · Very._..-.truly / :' . ?/,,, :. //.',.<.-....- , /'_~ Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COI~MISSION dlf Enclosure Department of Fish & Game, Habitat Section w/o eh. cl. Department of Environmental Conservation w/o encl. Mr. Bll! H. Lamoreaux ALASKA OIL AND GAS CONSERVATION COMMISSION STEVE COWPER, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279.1433 Telecopy No. (907) 276-7542 May 22, 1990 ADMINISTRATIVE APPROVAL NO. 44.43 Re. The application of SHELL WESTERN E & P, INC. to drill, complete, and produce the Middle Ground Shoal 18756 No. C-22A-26 in the Middle Ground Shoal Field. W. F. Simpson ~ Manager, Regulatory Affairs Alaska Division Shell Western E & P, Inc. 601 West Fifth Avenue, Suite 800 Anchorage, Alaska '99501 Dear Mr. Simpson: The referenced application was received on May 10, 1990. The drilling of the Middle Ground Shoal No. C-22A-26 is in the steeply dipping West Flank part of the field which requires closer than 80 acre areal well spacing to adequately drain this part of the reservoir. The Alaska Oil and Gas Conservation Commission has studied, the evidence available and hereby authorizes the drilling, com- pletion, and production of the referenced well pursuant to Rule 6 of Conservation Order 44. Commissioner BY ORDER OF THE COMMISSION dlf/3.AA44 Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 May 10, 1990 Alaska Oil and Gas Conservation Commission 300t Porcupine Drive Anchorage, Alaska 99501 Gentlemen: SUBJECT: SUBMISSION OF THE APPLICATION FOR PERMIT TO DRILL MIDDLE GROUND SHOAL WELL NO. C22A-26 Enclosed in triplicate is the Application for Permit to Drill the next well at Middle Ground Shoal, well no. C22A-26. The surface location is Platform C, Leg 4, Conductor 30. The well is currently scheduled to spud on May 18, 1990. In the unlikely event that H2S is encountered, we intend to comply with the 20 AAC 25.065 and follow the "Recommended Practices for Conducting Oil and Gas Production Operations Involving Hydrogen Sulfide". Please note that the closest producer is C22-26, which is 1440' from the proposed well at the top of the producing interval. This well, C22A-26 is the third producer in the governmental quarter section, for which we request a variance from Conservation Order #44, Rule 1 (Spacing Pattern) under provisions contained in Conservation Order #44, Rule 6 (Administrative Approval). The current well plan calls for a TVD of 10,042', but SWEPI would like to maintain the flexibility to drill to a maximum prognosed TVD of 10,500'. If you have any questions regarding this report, please contact Susan Brown-Maunder at (907) 263-9613. Very Truly Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/vj AOGCC/051090A. DOC STATE OF ALASKA ..... ALASKA"*"-'_ AND GAS CONSERVATION C tMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill ~ Redrill []1 lb. Type of well. Exploratory [] Stratigraphic Test ~ Development Oil ~ Re-Entry ~.' DeepenFlI Service ,] Developement Gas ~ Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool SHELL WESTERN E&P INC. 105' KB feet ,~?.iddle Ground Shoal 3. Address 601 West Fifth Ave., Suite 800 6. Property Designation Anchoraqe, AK 99501 ADL 18756 "G" Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond lsee 20AAC 25.025) Platform C, Leg 4, Conductor 30 Middle Ground Shoal Blanket At top of productive interval 3843' ~ & 2414' 8. Well nu .mber Number ~',,¢,'~ ~ of SEC. 26, T8N, R13!.J£Z~: ~,~/_,~ C22A-26 400 HM7522 At total depth 3217' ~ & 2414' ~ of 9. Approximate spud date Amount SEC 26, T8N, R13W May 18, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 14'~5' l:,II of Sec 26feet 1440' C22-26 RD feet 3746' 11,849 & 10,042' feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 375 feet Maximum hole angle44.]. Maximum surface 2119 psig At total depth (TVD) 5734 ps~g 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 17-1/2" 13-3/8" 54.5 K-55 BTC 1203' 0' 0' 1203' 1200' 440 sx "6" + Additives 12-1/4" 9-5/8" -~3.5 L-80 LTC 4384' O' O' 4384' 4000' 560 sx 'IG" + Additives 47.0 L-80 LTC 5033' 4384' 4000'9417' 8000' 8-1/2" 7" 26.0 L-80 LTC 1465 9117' i].~d~10582 9067' 1025 sx "¢.-." + Additive~ ~? fl P-llfl ITC 19~7 ~n~,?'¢l qn~7,1~z[qqlnn4?, 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor SurfaceRECEIVED Intermediate Production Liner MAY 1 0 1990 Perforation depth: measured ~[aska..0i~ & Gas 00ns, C0mmis~i0.rl true vertical ' Anch0rag~ 20. Attachments Filing fee ~ Property plat ~ BOP Sketch ~ Diverter Sketch ~ Drilling program ~ Drilling fluid program ~ Time vs depth plot ~ Refraction analysis ~ Seabed report ~ 20 AAC 25.050 requirements _- 21. I hereby certify that the foregoin~a is true and correct to the best of my knowledge ,~, , ~ ~ ~' ~-/4-o /v~. t_. ~ oo ~a ~ o,,¢ 5-/0-?o Signed ¢"/¢/,,~z¢¢''¢''~''~'- ;--'---'~"~ Date -~ ' Title Division Operations ~'~ana_qer ~.,~/ , ~ Commission Use Only Permit Number lAP, number I Ap(~:).~o/v~.13d/a~0 I See cover letter ~0 '~-, '~ 50--/~,~ ~-- 2--CD ~///,,~ for other requirements Conditions of a"~proval Samples requir~ed ~ Yes ~No Mud log required ~ Yes .~. No Hydrogen sulfide measures ~ Ye~s~,,~. No DirectS)hal survey required ~ Yes ,.~ No Required workin~qd~es~ur~[9.,e f~/C'~PE .~'~.,2~ ~' 3M,~, '~i SM; ~ 10M; ~ 15M Other: / ~"~/( /~~~~._ ~_ ~~/&12 - by order of ~ Approved by ~ ,--// . ~,.._/ ~,,/~/~~ Comm,ss,oner the commission Date Form 10-401 Rev. 12-1-85 / Subm/i riplicate WELL LOCATION PLAT MIDDLE GROUND SHOAL FIELD COOK INLET, ALASKA WELL: C22A-26 LEASE NO: - ADL18756 0 oo 528O FT PROPOSED LOCATION AT THE TOP OF OBJECTIVE' 3843 FT FROM N LINE & 2414 FT FROM E LINE SECTION 26, T8N, R13W A.S.P. PROPOSED LOCATION AT TOTAL DEPTH: 3217 FT FROM N LINE & 2'414 FT FROM E LINE SECTION 26, T8N, R13W A.S.P. ALASKA DIVISION DRILLING PROGNOSIS 11/20/89 WELL' C22A-26 LOCATION' PLATFORM 'C", LEG 4, CONDUCTOR 30 OBJECTIVE' HEMLOCK EVALUATION GEOLOGY SWEP~ ~NTEREST' 66.67% AFE NO: FIELD: MGS EST. ELEVATION: 10,5' [mean Iow Iow fide: DRILLING 73'] CORES LLJ o z WELL CASING ELEC. MUD SIGNIFICANT DEPTH AND SURVEYS LOGGER FORMATIONS TVD MD CEMENT <~ o 0 24" Conductor 370 13-3/8" Surface Casing 1200 9-5/8" Protective Casing 8O0O HC HZ 7" Prod. Liner 93O5 9905 10O42 9417' 10882r 11669' 11849' HOLE DEV. HOLE AND DIR. SIZE CONTROL 17-1/2" 12-1/4" 8-1/2' M U D PROGR,~ LIJ O ZO LLIcy , O ._1 '---' 3: t,.... © .--F° D (D .to c~0 .,_, O o4 ,c. ~ 0 ~ DRILLING PROGRAM MIDDLE GROUND SHOAL C22A-26 1. Rig up. 2. Drill out 24" casing shoe with 17-1/2" bit. Continue drilling to 375'. 3. Kick off at 375' and directionally drill to 1,203' MD using 17-1/2" bit. 4. Run and cement 13-3/8", 54.5#, K-55, BTC casing. 5. Nipple up BOP stack. Test all connections, valves, and rams to 3,000 psi. Test annular preventer to 2,500 psi. Test all kelly, stand pipe, and emergency valves to 3,000 psi. Test casing to 1,500 psi. All tests performed in accordance with AOGCC regulations. 6. Drill out 10' and perform leak off test. 7. Directionally drill 12-1/4" hole to 9-5/8" casing point. Run wireline logs. 8. Run and cement 9-5/8", 43.5 and 47#, L-80, LTC casing. 9. Nipple up BOP stack. Test all connections, valves, rams kelly, standpipe and emergency valves to 5,000 psi. Test annular preventer to 3,500 psi. Test casing to 3,000 psi. All tests performed in accordance with AOGCC regulations. 10. Drill out 10' and perform leak off test. 11. Directionally drill 8-1/2" hole to TD. Run wireline logs and casing caliper log. 12. Run and cement 7", 26#, L-80 and 32#, P-110, LTC liner. 13. Proceed with cased hole completion prognosis. RRW/050890. RECOMMENDED MUD PROGRAM C22A-26 Interval: Mud Type: Recommended Propert i es: Interval · Mud Type- Recommended Properti es- Interval- Mud Type' Recommended Properti es- 17-1/2" HOLE 0 - 1,203' Spud Mud (water and gel). Generic mud #2 * Weight = 8.5 to 9.0 ppg * Funnel Viscosity = 40 to 50 sec/qt * Plastic Viscosity : 5 to 10 cp * Yield Point : 10 to 20 lb/lO0 sq ft * Fluid Loss : no control * pH = 9.0 to 9.5 12-1/4" HOLE 1,203' to 9,417~ Water and gel. Disperse only if required. Generic mud #2. * Weight = 8.8 to 9.5 ppg * Funnel Viscosity = 36 to 42 sec/qt * Plastic Viscosity : 5 t 12 cp * Yield Point = 10 to 15 lb/lO0 sq ft *API Fluid Loss : 20 cc * pH : 8.5 to 9.5 * MBT = 15 to 25 8-1/2" HOLE 9,417' to 11,849~ Freshwater dispersed lignosulfonate mud with 1% KC1. * Weight: 9.3 to 9.8 ppg, or as required to combat waterflood pressure (11 ppg anticipated) * Salinity -- 1% KC1 * Funnel Viscosity - 40 to 45 sec/qt * Plastic Viscosity: 15-20 cp * Yield Point: 10-20 lb/lO0 sq ft *API Fluid Loss: 10 cc; 5 cc by HC * HTHP FL at 150°F: less than 20 cc; 10 cc by HC * pH: 9.5 t 10.5 * MBT: 15 to 25 RRw/050890. Mt. d in ares 'tion 3r a ~ oil der- ;ub- alty ~nal the ~der , 24 the the ram ANNOTA TED 119 manager determines both the number or percentage (which is fre- quently quite small) of interests which it will buy as well as the amount it will pay for such interests. .~ Casing Heavy steel pipe used to seal off fluids from the hole or to keep the hole from caving in. There may be several strings of casing;~ one inside the other, in a single well. Most oil wells are completed with two strings of cemented casing, the surface pipe and the production string. The surface pipe serves as conductor of the drilling fluid through loose, near-surface formations during deeper drilling, protects potable water supplies, anchors blowout preventers for deeper drilling, and supports at the surface deeper casing strings when hung. The production string serves as a conduit to the surface for produced fluids and confines each fluid- bearing zone to its native place. In many cases a third casing, called the intermediate or protective string is also cemented in place. This string sometimes accomplishes some of the purposes of surface strings but generally it is set for the purpose of protecting sections of formations which would prove troublesome if exposed during deeper drilling. See Bugbee, "An Introduction to Oil Well Cement Technol- ogy,'' 16 Oil and Gas Compact Bull 26 (June 1957). "Production casing is the series of steel pipe lengths, screwed or welded together and called the 'string,' through which the oil flows to the surface. Surface-casing is not the same as the production string. It usually is an outer casing or jacket of the string. One pur- pose of surface-casing is to prevent contamination of fresh water strata which have been penetrated and to seal off fluids from the hole. Another purpose is to prevent caving at the surface. Surface- casing is a tubular product lighter than the string. Sometimes, how- ever, the production string itself serves as the surface-casing. Surface- casing may go down a thousand feet or more." Harper Oil Co. v. United States, 425 F.2d 1335 at 1336, 36 O.&G.R. 190 at 192 (10th Cir. 1970). See also Ocrr£R CONDUCTOR. Casinghead The head or top of the casing set in a well. See also CHRISTMAS TREE. · · · 5. 6, CASING AND CEMENT PROGRAM C22A-26 Run 13-3/8", 54.5#, K-55, BTC from 1,203~ to surface. Casing design criteria are attached. Cement surface casing using 20% excess on gaged hole volume from TD to conductor shoe. Lead with 240 sx Class "G" + 10% gel + 2% CaC12 + defoamer and friction reducer as required (12.8 ppg, 10.8 gal/sk, 1.94 cf/sk) followed by 200 sx Class "G" + 2% CaC12 + defoamer and friction reducer as required (15.8 ppg, 5.0 gal/sk, 1.15 cf/sk). Perform top job within shoe of conductor. Run 9-5/8", 43.5 and 47#, L-80, LTC from TD to surface. See attached casing design criteria. Cement to be 1000 ft above the shoe using 30% excess on caliper (preferably 4 arm caliper). Lead with an estimated 360 sx (based on a 15" hole) Class "G" + 4% gel + additives for rheologies (14.2 ppg, 7.6 gal/sk, 1.52 cf/sk, 2,000+ psi ultimate compressive strength) followed by 200 sx Class "G" + additives for rheologies (15.8 ppg, 5.0 gal/sk, 1.15 cf/sk). Run 7", 26 and 32#, L-80 and P-110, LTC from 11,894' to 300' above the 9-5/8" shoe. Extend the liner to cover any excessive casing wear in the 9-5/8". See attached casing design criteria. Cement liner with Class "G" + 1% KC1 + retarder + defoamer + fluid loss agent for WL less than 100 cc @ 150°F as required (15.5 ppg, 5.3 gal/sk, 1.19 cf/sk). Total thickening time between 3-1/2 and 4-3/4 hours brought up to temperature in 45 minutes. An estimated 1025 sx of cement will be required (based on 12-1/4" hole to the HC marker and 9-5/8" hole from the HC marker to TD). RRW/050890. C22A-26 CASING DESIGN Casinq Desiqn Criteria Frac Gradient Pressure Gradient Max Collapse Pressure Max burst Pressure 13-3/8" .57 .467 583 psi (Full evacuation) 1245 psi (1/3 BHP @ 9-5/8" csg pt) 9-5/8" 7" (Liner) .79 .467 .57 3736 psi 10,000 psi · (Full evacuation) (pressure from frac treatment) 3700 psi 10,000 psi (injection pressure) (pressure from frac treatment) Size Depth 13-3/8" 0-1203' MD O- 1200' TVD 9-5/8" 0-4384' MD 0-4000' TVD Grade/ Weiqht Couplinq 54.5# K-55 BTC 43.5# L-80 LTC 4384-9417' MD 47# L-80 4000-8000' TVD LTC 7" 9117-10582' MD 7703-9067' TVD 26# L-80 LTC 10582-11849' MD 32# P-110 9067-10042' TVD LTC ACTUAL DESIGN CONDITION Tension # Collapse Burst Wt in Mut PSI PSI 56,000 561 1245 **Casing Rating/Design Factors** Tension (m) Collapse Burst 853/10+ 1131/2.02 2820/2 26 31 O, 000 1868 37 O0 134,000 3736 3700 825/2.66 3714/1.99 6712/1.81 905/6.75 4805/1.29 6688/1.~_ 22,000 5176 3700 519/10+ 5442/1.05 7160/1.94 -22,000 10000 10000 N/A 10857/1.09 12120/1.21 RRW/O 11090a. MISCELLANEOUS C22A-26 The maximum pressure gradient is expected to be .571 psi/ft. Maximum BHP is expected to be .571 x 10,042 : 5,734 psi. The shallowest depth at which abnormal waterflood pressures could be encountered is below the protective shoe. Maximum surface pressure is expected to be 2119 psi, assuming a full column of .360 psi/ft oil. The well will be drilled in compliance with the Alaska Oil & Gas Conservation Commission's regulations issued April 2, 1986. The proposed well path is in the vicinity of the following active producers and injectors: C22-26RD, C23-26 and C31-26. In order to prevent possible intersections with these wells, collision cones of uncertainty have been calculated for each well based on the survey instruments used to survey each. The proposed wellpath does not intersect any of these collision cones. Should the actual wellpath intersect any of these collision cones, the affected well(s) will be shut in and bled down. Single shot gyro surveys will be taken while drilling the surface hole and MWD surveys will be used while drilling intermediate hole. As noted in the drawing of the diverter, both 10" mechanical valves will be kept in an open position until the preventer is closed. The mechanical valves will be wired full open and tagged with instructions concerning proper procedures for closing a valve in the event the preventer is closed. RRW/IOIOgOa. ,7-1/2" HOLE 2000 PSI . 'ACK TOP OF KELLY BUSHING v. ~I TOP OF DERRICK FLOOR ~ ~(/~ .j-- BOTTOM OF ROTARY BEAM DRILL NIPPLE FLOW LINE FILL UP LINE 1 ~/~20' 2000 PSI FLANGE ~ ~-'~/' /---TO 'BE CONNECTED SO THAT VALVE IS ~ ~ / AUTOMATICALLY & SIMULTANEOUSLY b ~1 / OPENED WHEN THE ANNULAR PREVENTER ' ~ IS CLOSED. BOTH 10' MECHANICAL FULL-OPENING VALVES WILL BE IN AN OPEN POSITION. UPON CLOSING THE ANNULAR PREVENTER THE PROPER DIVERTER LINE IS SELECTED. MAIN DECK 20' 2000 PSI RISER F WELLHEAD ROOM FLOOR 7/'26/89 ! .40' · 2-1/4' HOLE TOP OF KELLY B!JSHING · TOP OF DERRICK FLOOR 3000 BOTTOM OF ROTARY BEAM FILL OP LINE PSi ',., .ACK DRILL NIPPLE ANNULAR PREVENTER 5000 PSI FLOW LINE t3-5/8" 5000 PSI FLANGE BLIND RAM 5000 PS.I PIPE RAM :.)000 PSI / 1/16' ;KILL LI MAIN DECK DRILL SPOOL 1 $-6/t!' ~,000 PSI FLANGE '3- 1,"8' CHOKE TOP OF SUBBASE // ., / 13-5/8" fl00(.) P'.;'I ~ L,',L,IGE /' / · 9/10/87 · 13-5/8" 5000 PSI FLANGE CA,'3/ 13-5/~' 3000 PSI ~L,,".,I'..IC, E ) ~ H~^ z' 2000 ~ "WI: 13-3/8' SOW X 13-5/8' 3000 PSI 'WF" HOUSING , ,.~_.~,8- 1/2' HOLE 5000 PSLSTACK ~ OP OF KELLY BUSHING i~OP OF DERRICK FLOOR "BOT~rOM OF ROTARY BEAM DRILL NIPPLE FLOW LINE FILL UP LINE ~/I PREVENTER BLIND RAM 5000 PSI :.~0 TOP OF SUBBASE -, //////// MAIN DECK 5000 PSI RISER . ~3-5/8' 5000 ~SI FL~G~ ~CASING~ ~ I 9/10/87 13-3/8" SOW X 13-5/8' 3000 PSI "WF" HOUSING N.T.S. NOTE: DIMENSIONS INCLUDE 1/2' GAP BETWEEN FLANGES SHELL MINIMUM BOP STACK REQUIREMENTS Min. Min. No. Item I.D. Nominal 1 Flowline 7" 2 Fill up Line 2" 3 Drilling Nipple 4 Annular Preventer 5 Two single or one dual hydrualically operated rams 6 Drilling spool with 2" and 3" min. outlets 7 Gate Valve 3 1/8" 8 Gate Valve Power Operated 3-1/8" 9 Line to choke manifold 3" 10 Gate Valve 2-1/16" 11 Check Valve 2-1/16" ~3 Casing Spool 14 Valves Gate 1-13/16" i 5 Compound Pressure Gauge connector '"'~6 Control plug or valve 1-13/16" 17 Kill line to rig mud pump manifold 18 2" X 2" X 2" cross *NOTE: Additional specifications for Air/Gas Service are given in Shell Well Control Manual, Appendix 6.18. A rotating heacl shall be provided on Air/Gas Service OPTIONAL 12 Wear flange or bore protector 19 Gate valve 20 Line to roadside connection 2" 21 Rotating blowout preventer ~ _ _ 22 Gate valve power operated 6" DRAWING & CHECK LIST 104A SHELL CLASS 5M SURFACE INSTALLATIONS NORMAL AIR/GAS* FOR AIR/GAS DRILLING CONFIGURATION A ANNULAR PREVENTER BLIND RAM PIPE RAM Location optional SHELL MINIMUM AUXILIARY EQUIPMENT REQUIREMENTS Master control with Hydril pressure regulating valve. a~ unit remote control Hydraulic BOP operating unit. See below for detail. Kelly cocks [] Upper [] Lower Pressure Rating 5,000 psi Kelly saver sub with protector rubber. Inside BOP, surface type, for each size drill pipe. Full opening ball valve for each size drill pipe in use. Labelled crossover subs for each different connection in drill string. OPTIONAL AUXILIARY EQUIPMENT * Circulating head for each size drill pipe in use with steel pipe and Chiksan joints to reach stand pipe connection. . Inside BOP - Drop or downhole type. Cup or plug type BOP tester with spare seals. SHELL MINIMUM HYDRAULIC OPERATING UNIT SPECIFICATIONS Accumulator volume - must deliver 1.5 times the volume to make position change on all hydraul- ically operated units and retain 1200 psi (200 psi above precharge) without pumps. Pump capacity to obtain 200 psi above accumulator precharge pressure in two (2) minutes or less, while closing annular preventer and opening choke line valve. See Section 4.31. Power for pumps - 2 sources required - Air-Electric or All Air (rig air plus separate air tank) - 2 pumps required. Lines from operating unit to BOP units 5,000 psi Minimum Yield [] Seamless steel lines .90" minimum I.D. [] Seamless steel lines with Chiksan joints. [] Hose per Section 4.32 Operating unit fluids' Hydraulic oil or soluble oil. All controls shall be clearly marked to show unit operated. Blind Ram control to have easily removed latch or guard. Sufficient bottled nitrogen or other back-up storage system to equal accumulator capacity, manifolded to by-pass accumulator and close BOP directly. Alarm, or visual indicator to show when accumulator is shut off from preventers. SHELL MINIMUM MUD SYSTEM REQUIREMENTS Pump stroke counters each pump. Deqasser. Pit volume recorder with alarm. Flow line monitor. OPTIONAL MUD SYSTEM EQUIPMENT Trip tank (with 6th man) Flow line gas separator. MISCELLANEOUS EQUIPMENT SPECIFICATIONS AND INSTALLATION INSTRUCTIONS 1. All connections shall be welded, studded, flanged or Cameron clamp of comparable rating. 2. All flanges shall be APl 6B or 6BX and ring gaskets shall be APl steel RX or BX. Do not re-use BX rings. Always use new rings below lower most preventer when flanges are parted. 3. Drilling spools shall be forged or forged and welded. Pipe spools not acceptable. 4. BOP stack shall be braced to subbase or suitable support by turnbuckled lines Or rods. (No rigid connections.) 5. All gate valves shall be equipped with handwheels. Rams should have manually operated screw locking extensions (extended beyond subbase) ready for use. 6. For land rigs the master control station and operating unit shall be located at ground level a minimum of 50' from the well. The remote station is to be located near the driller's position. Inoperative condition of the remote unit is not to interfere with operation of the master control unit. For platform and barge rigs the master control station and operating unit may be on the rig floor with the remote station located so that is protected from the well area and accessible from a logical evacuation route. Hydraulic lines may be high pressure hose provided they meet the require- ments in Section 4.32 in the Shell Well Control Manual. 7. Housing and heating should be provided for accumulator, blowout preventers, choke manifold where conditions warrant. 8. Contractor shall make no connection to casing head side outlets except by orders of Shell. ., 9. One spare set of ram blocks for the drill pipe in use shall be kept on rigs. 10. Any misalignment of rig should be corrected to avoid undue wear of casing. 11. Four way valves shall be kept open or closed, not in neutral positon. *Nor applicable to well servicing wirhout drill pipe. . 8. 9. 10. SHELL WESTERN E&P INC. MIDDLE GROUND SHOAL FIELD PLATFORM "C' CHOKE MANIFOLD 3' 5 KSI LINES CROSS 3' X 3' X 3" X 3" 5 KSI CROSS 3' X 3' X 3" X 3" X 3' 5 KSI , 3" 5 KSI GATE VALVE ADJUSTABLE MANUAL CHOKE - 3" 5 KSI REMOTE OPERATED CHOKE - 2-9/16" 10KS! HYDRAULIC ADJUSTABLE PRESSURE GAGE 4' LINES MUD/GAS SEPARATOR 6' LINE TO MUD PITS INLE' VENTED AT CROWN Tf-/ t, 4! ir"1 DITC' PLATFORM 'C' SOLIDS CONTROL 1/11/88 OPERATING MODE DRILLING UNWEIGHTED MUD' DRILLING WEIGHTED MUD TRIPPING BUILD SLUG GATES CLOSED D, E, G D, E, G E, F, C, G C, D, F MUD FLOW ROUTING 1-2-3-4-5 1-2-3-4-5 4-5-2-3 1-2-3-4 SOLIDS EQUIP. IN USE SS, 4" SS SS, 4' COMMENTS MAY WANT TO OPERATE 4' 4" TURNED OFF w/WEIGHTED MUD DERRICK FLO-LINE I I __[_ I I tTRW ~ ,, BRANDT DEGASSER BG-10 ® SLUG PIT SAND TRAP o~ ~o_ 0~ 0~ Legend ~'~ TOP EQUALIZATION ~ BOTTOM EQUALIZATION ~ AGITATOR NOTE' All equalizers (except from pit 1 to 2) are riser type and can be used for either top or bottom equalization. CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE --'-- ('2 ' thru 8) (8) (3) mdmin ~,p(- ,, ,~_~f~ 9. - ~'-/d-~ 11. (10 and 13) 12. 13. (4) casg ~,~C. ,"-~¢-~ (14 thru 22) (23 thru 28) Company .~'-~/~/~, // Lease & Well N°. /~7,~ /~ ~"_~ ~ /~' ~ ~.. 2-,~-- 2_ "" YES NO -/REMARKS Is the permit fee attached .......................................... ~ -- 2. Is well to' be located in a defined pool ............................. ~ ..... 3. Is well located proper distance from property line .................. ~' 4. Is well located proper distance from other wells .................... ---- ~-~ 5. Is sufficient undedicated acreage available in this pool ............ ~_ 6. Is well to be deviated and is wellbore plat included ................ ' , 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... , Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is conductor string provided ........................................ ~, Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... ~.. , , Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will al! casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. _--- Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating- Test to ~0o°~F~o~psig .. Does the choke manifold comply w/API RP-53 (May 84) ................. ~' Is the presence of H2S gas probable ................................. (29 thru' 3~)- (6) Add: /~, ,~~'.-/~- ~ Geology: Engi,neering: . _ rev: 01/30/89 6.011 · For 29. 30. 31. 32. INITIAL GEO. UNIT ON / OFF POOL CLASS STATUS AREA NO. SHORE , exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements .............................................. Additional Remarks: ) · '