Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
189-103
Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / 00'~'-'/~ File Number of Well History File PAGES TO DELETE RESCAN rn Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/TYpe OVERSIZED /~ Logs of various kinds [] Other Complete COMMENTS: Scanned by:~Bren Vincent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Bren Vincent Nathan Lowell Date: ~si NOTScanned.wpd THE MATERIAI~ UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTO.BER 24, 2000 E P M C:LO~hMFILM.DOC TE R IA L It' IS M .A E W UNDER R K E R STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown: Stimulate: Plugging: Perforate: X Pull tubing: Alter casing: Repair welii Other: 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Union Oil of California (Unocal) Development: X 115' feet 3. Address Exploratory: 7. Unit or Property name Stratigraphic: Granite Point 17587 P.O. Box 196247 Anchorage, Alaska 99519-6247 Service: 4. Location of well at surface Leg #1, Slot #7, Platform Bruce 8. Well number 2050' FSL & 2015' FWL, Sec. 31, T11N, R11W, SM 6 At top of productive interval 9. Permit number/approval number 1227' FWL & 2204' FSL, Sec. 30, T11N, R11W, SM ORII INAL 89-103 At effective depth 10. APl number 1271' FWL & 2092' FSL, Sec. 30, T11 N, R11W, SM 50-733-20439-00 At total depth 11. Field/Pool 1250' FWL & 2150' FSL, Sec. 30, T11 N, R11W, SM Mid. Kenai/Granite Point 'i 2. Present well condition summary Total depth: measured 12,434 feet Plugs (measured) Cement plug from 12,434'-12,270' true vertical 10,360 feet Effective depth: measured 12,270 feet Junk (measured) EZSV bridge plug @ 11,020' true vertical 10,197 feet Casing Length Size Cemented Measured depth True vertical depth Structural 570' 20" 1040 sx 616' 615' Conductor 3929' 13-3/8" 3000 sx 3963' 3307' Surface 7758' 9-5/8" 1000 sx 7803' 5971' Intermediate 3211' 7-5/8" 700 sx 7434'-10,645' 7434'-8575' Production 2095' 5-1/2" 408 sx 10,305'-12,400' 8238'- 11,963' Liner Perforation depth: measured 10770-10816, 11058-11082, 11429-11454, 11460-11469, 11501-11525, 11578-11592, 11612-11673, 11696-11726, 11738-11750, 11778-11796, 11827-11844, 11852-11916, 12090-12145, 12152-12217 true vertical 8700-8745, 8988-9012, 9358-9383, 9389-9398, 9430-9454, 9507-9521, 9540-9601,9624-9654, 9666-9678, 9706-9724, 9755-9772, 9780-9844, 10017-10073, 10080-10144 Tubing (size, grade, and measured depth) LS: 2-7/8", N-80, 6.4# @ 10417' SS: 2-7/8" & 2-3/8" N-80 to 10272' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 59 3 1 57 60 Subsequent to operation 70 4 4 60 63 15. AEachments: 16. Status of well classification as: Copies of Logs and Suweys run: Daily Repo~ of Well Operations: Oil: X Gas: Suspended: Sewice: 17. I hereby ce~i~ that the foregoing is true and correct to the best of my knowledge: Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192. PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 November 3, 1992 Janet Bounds Unocal P O Box 190247 Anchorage, AK 99519-0247 Dear Ms Bounds: As we discussed on the phone October 28, AOGCC will be reassigning APl numbers for the wells listed below. In order to accommodate the revision of Unocal's records, we will not announce these changes to the public until the first week of December, or until you advise me that all the necessary changes are made. Give me a call if you would like to discuss this matter further. Well Name Permit # Old APl Number New APl Number Granite Pt St 17587 #3 66-52 · 50-883-10031 50-733-20437 Granite Pt St 17587 ~ 89-30 50-883-10032 50-733-20438-90 Granite Pt St 17587 ~6 89-103 50-883-10034 50-733-20439 Granite Pt St 18742 #8 67-36 50-883-20008 50-733-20440 Granite Pt St 17586 #4 67-54 50-883-20009 50-733-20441 Granite Pt St 18742 #34 79-17 50-883-20009-01 50-733-20441-01 Granite Pt St 17586 ~1 91-45 50-883-20009-02 50-733-20441-02 Granite Pt St 18742 #14 79-33 50-883-20010 50-733-20442 Granite Pt St 18742 #20 68-16 50-883-20012 50-733-20443 Granite Pt St 18742 #20RD 91-20 50-883-20012-01 50-733-20443-01 Granite Pt St 17587 #5 68-24 50-883-20013 50-733-20444 Pretty Creek Unit #2 79-9 50-283-20022 50-283-20022-90 Nicolai Creek Unit #4 91-100 50-283-20033 50-283-20033-90 Lewis River D-1 89-72 50-283-20068 50-283-20068-90 Trading Bay Unit G-18DPN 83-135 50-733-20160 50-733-20160-90 Yours truly, Robed P Crandall Sr Petr Geologist /jo STATE OF ALASKA Ab .A OIL AND GAS CONSERVATION COMMIS._ .3N : REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown m Stimulate _2¢._ Plugging m Perforate __ Pull tubing _~L Alter casing __ Repair well _2C. Pull tubing .x Other 2. Name of Operat~ru'NOCAL ) Union Oil Company of 3. Address P.O. Box 190247, Anch., 4. Location of well at surface Leg # 1, 2015' FSL & 2050' FWL, At top of productive interval 1227' FWL & 2204' FSL, At effective dept.I1 1271' FWL & 2092' FSL, 12/~t8tgld~.~ & 2150' Fs'r,, California AK, 99519 5. Type of Well: Development Exploratory Stratigraphic Service Slot 7, Platform Bruce Sec. 31, TllN, RllW, SM Sec. 30, TllN, RllW, SM Sec. 30, TllW, RllW, SM Sec. 30, TllN, RllW, SM M: 6. Datum elevation (DF or KB) 115' 7. Unit or Property name Granite Pt 17587 8. Well number No. 6 9. Permit number/approval number 90-886 10. APl number 50-- 883-10034 .~. Eield/Poel _ · . i~ena[/~ran[~e Pt. feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12,434 10,360 12,270 10,197 feet Plugs (measured) feet feet Junk (measured) feet Cement plug from 12434'-12270' EZSV Bridge plug @ 11,020' Casing Length Size Structural Conductor 570 ' 20" 1040 sx 3929' 13-3/8" 3000 SX Surface 7758' 9-5/8" 1000 SX Intermediate3211 ' 7-5/8" 700 sx Production 2095' 5-1/2" 408 sx Liner 152' 2.98" SSWR --- Cemented Measured depth 616' 3963' 7803' 7434'-10,645' 10,305'-12,400' 10,673'-10,825' Perforation depth' measured See attachment #1 True vertical depth 615' 3307' 5971' 8575' 10,327' 8,755' true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) L S 2-7/8" S.S. 2-7/8", Baker SC-iL Baker Model 2-3/8" N-80 @ Packer @ "D" pkr @ 10 671' t, ji!~\?.? 17~ i991 10,827 ' .... 13. Stimulation or cement squeeze summary 10,770'-10,816' Intervals treated (measured) Fracture w/ 9607# Treatment description including volumes used and final pressure 20-40 carbolite 12 BPM @ 8( psi. 14. Prior to well operation 0 4O Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf WateroBbl Casing Pressure Tubing Pressure 0 0 0 0 2.0 - o 0 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations ..~ 16. Status of well classification as: Oil ~ Gas __ Suspended __ Service 00 r17. Iher~(:uc~/tif~.h. at~tf~goingistrueandcorrecttothebestofmykn~gtbna1 Drilling Manager Signed Form 10-404 Rev ~5/88 ATTACHMENT TO APPLICATION FOR SUNDRY APPROVALS (FORM 10-403) UNOCAL GRANITE POINT 17586 WELL NO. 8 PLATFORM BRUCE, COOK INLET, ALASKA Perforations Open to Production (MD & TVD of Top Internval, Size and Number) TOP BOTTOM MD TVD MD TVD INTERVAL 10,406' 8,483' 10,446' 8,515' 40' 10,525.5' 8,577' 10,596' 8,632' 71.5 10,652.5 8,684' 10,736' 8,740' 73.5 10,764' 8,761' 10,822' 8,806' 58' 11,138' 9,037' 11,150' 9,046' 12' 11,160' 9,053' 11,180' 9,068' 20' 11,205' 9,083' 11,274' 9,133' 69' 11,328' 9,169' 11,374' 9,201' 46' 11,390' 9,212' 11,410' 9,226' 20' 11,452' 9,253' 11,471' 9,269' 19' 11,552' 9,317' 11,572' 9,333' 20' 11,620' 9,363' 11,716' 9,423' 96' and Bottom and PERFORATIONS SIZE JSPF 0.5 10 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 0.5 14 Attachment #1 Granite Point ADL 17587 Well #6 Perforated the following intervals on 2/8/90 using 3-3/8" Hollow Carrier with Vann 32 Gram perforating charges, 4 SPF, 90 deg. phasing, 0.56" diameter: Measured Depth True Vertical Depth ~ Bottom Top Bottom 10,770' 10,812' 8,700' 8,742' 11,058' 11,082' 8,988' 9,012' 11,429' 11,454' 9,358' 9,383' 11,460' 11,469' 9,389' 9,398' 11,501' 11,525' 9,430' 9,454' 11,578' 11,592' 9,507' 9,521' 11,612' 11,673' 9,540' 9,601' 11,696' 11,726' 9,624' 9,654' 11,738' 10,750' 9,666' 9,678' 11,778' 11,796' 9,706' 9,724' 11,827' 11,844' 9,755' 9,772' 11,852' 11,916' 9,780' 9,844' 12,090' 12,145' 10,017' 10,073' 12,152' 12,217' 10,080' 10,144' Reperforated the following interval using Halliburton wireline guns 6 SPF, 60 degree phasing and 0.5" holes, on 11/08/90. Measured Depth True Vertical Depth To_9~ Bottom Top Bottom 10,772' 10,816' 8,701' 8,745' DATE 01/14/91 01/15/91 01/16/91 01/17/91 01/18/91 01/19/91 01/20/91 MW 65.1 65.1 65.1 66.7 67.0 67 68.9 ETD PLATFORM BRUCE WELL #6-7 COMMENTS PAGE 1 11,020' ACCEPTED RIG AND SKIDDED RIG TOWARDS LEG #1 SLOT #7. 11,020' SKIDDED RIG FROM LEG #3 SLOT Cf 1 TO LEG #1 SLOT cf7. MOVED RIG OVER BR 6-7. HOOKED UP SERVICE LINES. WELDED HANDRAILS. MIXED 5% KCL/NACL COMPLETION BRINE TO 8.7 PPG. TIED INTO THE ANNULUS WITH 2" LINE. 11,020' DISPLACED WELL. GOT BACK OIL, WATER AND GAS. AFTER DISPLACING THE WELL STILL HAD 10- 15% OIL.. WELL FLOWING. SHUT IN. HAD 60 PSI ON THE ANN, 120 PSI S.S. 30 PSI L.S. WEIGHTED UP TO 8.9 PPG AND CIRC. SHUT IN BLED OFF AND CIRC. 11,020' SHUT IN WELL, BLED OFF AND CIRC. WELL DEAD. REMOVED PRODUCTION MANIFOLD. INSTALLED BPV'S. REMOVED PRODUCTION TREE. INSTALLED BOPE. INSTALLED 2-7/8" DUAL RAMS IN TOP GATE, 2-7/8" X 2-3/8" IN THE BOTTOM GATE. INSTALLED FLOW LINE. ENGAGED TBG HANGER AND TESTED BOPE. BLED ANNULUS PRESSURE FROM 60 TO 0. EQUALIZED PRESSURE UNDER BPV'S. 11,020' RIGGED UP DUAL HANDLING TOOLS, PULLED BPV'S. ENGAGED DUAL HANGER. UNSEATED HANGER, TBG FREE. CIRC BOTTOMS UP. BACK GROUND GAS INCREASED FROM 120 UNITS TO 1260 UNITS. S/I WELL CONT'D TO CIRC ON FULL CHOKE. MAX GAS 2400 UNITS. MUD WEIGHT EVEN 8.9 PPG IN AND OUT. CIRC LONG STRING AND SHORT STRING CAPACITY. POOH WITH DUAL 2-7/8" TUBING STRINGS. 11,020' FINISHED LAYING DOWN DUAL 2-7/8" X 2-3/8" PROD STRING AND KOBE TYPE "B" CAVITY. CHANGED FROM DUAL RAMS TO SINGLE RAMS. COMPLETED BOPE TEST, OK. RIH WITH A TAPERED 2-7/8" X 3-1/2" D.P. STRING. TAGGED ETD AT 11,020', NO FILL. CIRC AT 11,020'. WELL FLOWING. SHUT IN . SIDPP 100 PSI, SICP 120 PSI. PRESSURE BUILT TO 160 PSI ON BOTH SIDES. CIRC GAS OUT. SOME TRANSPARENT JUNK WHICH APPEARED TO BE TUBING VARNISH OFF THE PRODUCTION TUBING. 11,020' CONT'D TO CIRC OUT GAS ON CHOKE. MW AN EVEN 8.9 PPG 1N'/OUT. WELL STABLE. CIRC AND BUILDING CLEAN 9.1 PPG NACL/5% KCL. PUMPED A 40 BBL, 25 PPB SAND SWEEP AND CIRC AROUND, PULLED UP TO 10,253'. CLEANED REST OF MUD PITS, CIRC CLEAN FLUID. RIH TO 11,020'. NO FILL. REVERSED AND CHANGED WELL OVER TO CLEAN 9.1 PPG BRINE. NTU AT SUCTION END 32-37, NTU AT FLOW LINE 85 TO 100, WELL DATE MW 01/20/91 (CONT) 01/21/91 68.9 01/22/91 69.3 01/23/91 69.2 ETD 11,020' 11,020' 11,020' PLATFORM BRUCE WELL #6-7 PAGE 2 COMMENTS FLOWING SLIGHTLY. SMALL AMOUNT GAS BUBBLES AT FLOW LINE. SHUT IN WELL AND TRANSFERRED DIRTY FLUID TO PRODUCTION AT 1800 HRS. PRODUCTION WAS UNABLE TO TAKE ANY MORE FLUID. TRANSFERRED FLUID AROUND AT SURFACE TO HOLD IN PITS. CLEANED SHAKER PIT. FINISHED CLEANING SHAKER PIT. SIDPP 45, SICP 60. RE-CIRC AND FILTERED COMPLETE SYSTEM. FINAL NTU'S AT 60. WELL STABLE. POOH. RAN TEST PLUG. CHANGED OUT HCR VALVE AND INSTALLED A SECOND 4" J-M MANUAL GATE VALVE ON CHOKE LINE AND TESTED 250 LOW 3000-HIGH, HCR GOOD. RIH WITH 5-1/2" RETRIEVAMATIC PACKER, 17 JTS 2-7/8" TBG CROSSED OVER TO 3-1/2" D.P. CONT'D TO HEAT AND FILTER 9.2 PPG FLUID. GELLED BRINE TO 70#/1000 GAL W/HEC. CONT'D TO TRANSFER 9.2 PPG BRINE TO BAKER AND GELLED TO 400 CPS. SET RETRIEVAMATIC PACKER AT 10,562', TBG TAIL AT 10,688'. TESTED ANNULUS AND PACKER TO 2000 PSI. RIGGED UP AND PRIMED TURBINES. TESTED LINES TO 11,000 PSI. CAUGHT 2100 PSI ON THE ANNULUS. PERFORMED AN INJECTIVITY TEST ON THE C-2 PERFS 10,770'-10,816' WITH 9.2 PPG NON-GELLED BRINE. PUMPED AT 10,780' PSI @ 15 BPM. TOTAL PUMPED 149 BBLS. ISIP 3400 PSI BLED TO 0 IN 50 MINUTES, MIXED AND BLENDED 28 BBLS (92 CU FT, 10,396 LBS, 12 PPG 20-40 MESH BAKER CARBO-PROP SAND) WITH 70#/1000 GAL HEC GELLED 9.2 PPG FLUID. SLURRY WEIGHT 13.7 PPG. PUMPED 92 BBLS 70# HEC 9.2 PPG PRE-PAD AT 12 BPM AT 8600 PSI, 26 BBLS (9607#) 20-40 MESH CARBO PROP AT 9 BPM. DISPLACED WITH 74 BBLS AFTER PAD AT 12 BPM. MAX PRESSURE WITH SAND ATTHE PERFS WAS 6510 PSI, ISIP 3574 PSI, 2850 PSI IN 15 MINS, 2600 IN 30 MIN. RIGGED DOWN SURFACE EQUIPMENT. TOTAL SHUT IN TIME 3 HRS, FSIP 1000 PSI. 46 CU~FT (5198#) OF SAND IN THE PERFS. UNSEATED THE PACKER AND ATTEMPTED TO REVERSE OUT WITH THE TAIL AT 10,670' PLUGGED. Al-tEMPTED TO PUMP DOWN D.P., PLUGGED. PULLED UP TO 10,632'. WORKED AND TRIED TO PUMP. STRING PARTED WITH 265 K HOOK LOAD, 80 K OVER PULL. CIRC TAGGED FISH AND REVERSED TO CLEAN THE FISH. CONTINUED TO REVERSE AND CLEAN UP TOP OF FISH. POOH. INNER MANDREL ON THE BAKER 5- 1/2" BAKER "EA" PACKER WAS PARTED. LEFT 2- 7/8" MULE SHOE, I JT 2-7/8" TBG, BAKER 5-1/2" PKR IN THE HOLE. TOP OF FISH AT 10,610'. WAITED ON BOAT TO ARRIVE WITH FISHING DATE MW 01/23/91 (CONT) 01/24/91 69.2 01/25/91 69.1 01/26/91 69.0 01/27/91 69.0 01/28/91 69.0 ETD 11,020' 11,020' 11,020' 11,020' 11,020' PLATFORM BRUCE WELL #6-7 PAGE 3 COMMENTS ASSEMBLY. JARRED AND WORKED UP HOLE TO 10,590' FREE, PULLED TO 10,270'. DROPPED KNOCK OUT BAR AND CiRC'D 90 BBLS, WELL STABLE. POOH. CONT'D TO POOH. RECOVERED 5-1/2" PACKER LEFT 4 FT 2.3" X 1.99" MANDREL, I JT 2-7/8" TBG AND 2-7/8" MULE SHOE. ESTIMATED TO OF FISH AT 10,615'. RIH WITH 4.6" OVERSHOT. BUMPER SUB AND JARS. PICKED UP KELLEY AND WASHED TOTHE FISH. TAGGED FISH AT 10,986'. ENGAGED FISH, CIRC. POOH. RECOVERED ENTIRE FISH 3.60" MANDREL, 2 XO'S, I JT 2-7/8" TBG, MULE SHOE. RIH O.E. AND REVERSE CIRC FROM 10,952' TO 11,017' DPM (TOP OF PLUG 11,010' DIL). REVERSE CIRC HI-VIS PILL. CONT'D REV CIRC HI-VIS PILL. SAW VERY LI~-rLE SAND. POOH. PICKED UP 3-1/2" CASING SCRAPER. RIH AND TAGGED ETD (~ 11,017'. CIRC AND FILTERED BRINE. BEGAN WITH 270 NTU'S RETURNING FROM THE WELL. CONT'D TO CIRC AND FILTER BRINE. CLEANED PITS #2, 3, 4, & 5. MIXED NEW BRINE. BEST READING WAS 140 NTU'S RETURNING FROM THE WELL BEFORE CHANGING OVER TO NEW BRINE. RAN THE BRINE IN A TEST CENTRIFUGE AND RECOVERED 1/10TH OF 1% SOLIDS. POOH. LAID DOWN BHA. INSTALLED 2-7/8" RAMS IN TOP GATE. TESTED TO 2000 PSI, OK. PICKED UP BAKER MODEL "D" (SUMP) PACKER ASSEMBLY AND RIH ON D.P. RIGGED UP W.L. RIH WITH GAMMA RAY TOOL. HAD TROUBLE WITH THE TOOL. POOH AND CHANGED OUT THE TOOL. RIH, CORRELATED THE PACKER SETTING DEPTH. DROPPED THE BALL AND SHEARED OUT WITH 20,000 LBS OVER PULL AND 2000 PSI. SET THE PACKER WITH THE PACKER TOP AT 10,827'. POOH. P/U GRAVEL PACK ASSEMBLY ON 2-7/8" TUBING. RIH. FINISHED RIH WITH THE GRAVEL PACK ASSEMBLY. SPACED OUT. SNAPPED INTO AND OUT OF THE SUMP PACKER. CIRC 10.0 BBLS OF CLEAN BRINE. DROPPED THE BALL. SET BAKER MODEL "SC-16" PKR AND RELEASED FROM SAME. BLEW THE BALL SEAT AND OBTAINED CIRC RATES AT EACH OF THE CROSSOVER TOOL POSITIONS. TESTED THE SURFACE LINES AND MANIFOLD TO 4000 PSI, OK. MIXED AND PUMPED 10 BBLS OF 350 CP HEC PRE PAD, FOLLOWED BY 5-1/2" BBLS SLURRY (6 PPG 20-40 CARBO-PROP GRAVEL, I0 CU FT). FOLLOWED BY 5 BBLS POST PAD. DISPLACED WITH BRINE. THE PACK SCREENED OUT AT 2000 PSI. ESTABLISHED CIRC RATE AT 500 PSI, AT 2 BPM. PRESSURED UP THE BACK SIDE AND REVERSED THE TUBING OUT. DATE MW 01/28/91 (CONT) 01/29/91 69.1 01/30/91 69.1 01/31/91 67.9 02/01/91 67.9 ETD 11,020' 11,020' 11,020' 11,020' PLATFORM BRUCE WELL #6-7 COMMENTS PAGE 4 RECOVERED +/- 3 CU FT OF GRAVEL. PULLED THE CROSS OVER TOOL ABOVE THE SC-1L PACKER AND WAITED 3 HRS. LOWERED THE CROSSOVER TOOL AND RE-STRESSED THE GRAVEL PACK TO 2000 PSI (TWICE). 100% OF THEORETICAL GRAVEL IN PLACE. POOH TO 10,305', CIRC. POOH. LAID DOWN GRAVEL PACK ASSEMBLY. CONT'D TO LAY DOWN THE GRAVEL PACK ASSEMBLY. CHANGED OUT THE UPPER PIPE RAMS TO 2-7/8". TESTED RAMS TO 2000 PSI. RIH WITH 5 STANDS OF 2-7/8" D.P. AND LAID DOWN SAME. CHANGED THE UPPER PIPE RAMS TO 3- 1/2" AND TESTED SAME TO 2000 PSI. RIH WITH 3- 1/2" D.P. AND LAID DOWN SAME (285 ,ITS). PULLED WEAR BUSHING. CHANGED OUt THE UPPER PIPE RAMS TO 2-7/8" X 2-7/8". TESTED UPPER RAMS TO 2000 PSI. RIH WITH 2-7/8" TAIL PIPE WITH A MULE SHOE. P/U 2- 1/2" TYPE "B" KOBE CAVITY AND RIGGED UP TO RUN THE DUAL COMPLETION. RIH WITH THE DUAL COMPLETION WHILE HYDROTESTING TO 4500 PSI. CONT'D RIH WITH THE DUAL 2-7/8" X 2-3/8" AND 2- 7/8" X 2-7/8" DUAL HYDRAULIC PRODUCTION STRING. HYDROTESTED ALL TBG TO 4500 PSI. DRIFTED THE 2-7/8" TBG TO 2.34" AND THE 2-3/8" TBG TO 1.9". TAGGED 5-1/2" SC-1L PACKER AT 10,667'. SPACED OUT THE TUBING. MADE UP 10" 5K CIW DUAL HANGERS. INSTALLED BPV'S. LANDED THE TUBING WITH TAIL AT 10,641'. 2-1/2" TYPE "B" KOBE PUMP CAVITY AT 10,246'. REMOVED DOPE. INSTALLED TREE. TESTED HANGER TO 5000 PSI FOR 20 MINUTES. RIGGED UP TO CHANGE WELL OVER TO POWER OIL. FINISHED RIGGING UP PRODUCTION LINES. CHANGING WELL OVER TO POWER OIL. PUMPING DOWN THE ANNULUS TAKING RETURNS UP THE L.S. THROUGH THE CHOKE MANIFOLD TO THE MUD PITS. WELL WOULD NOT FLOW. DROPPED AND PUMPED THE STANDING VALVE. TESTED THE L.S. TO 2000 PSI, OK. RELEASED RIG AT 1200 HRS 2/1/91. ITEM= NO = # .... # .... # BRUCE 17587 WELL # 6 SHORT STRING DESCRIPTION !-31-91 = LENGTH = BOTTOM = TOP # # # # C = 1 =KOBE TYPE "B" # .... # .... # D = 1 =1 1/2" 10RD x # .... # .... # ....... 2 1/2" CAVITY 2 3/8" XO 3/8" 4.6# N-80 BUTT PUP 3/8" 4.6# N-80 BUTT TBG 3/8" 4.6# N-80 BUTT PUP = 1 =2 # .... # .... # - _ = 13 =2 # .... # .... # = 1 =2 # .... # .... # E = 13 =2 3/8" 4.6# N-80 BUTT TBG # .... # .... # .................. = 19.00 = 0.35 = 6.90 = 400.25 = 4.08 = 401.45 =10265.79 =10246.79 # # # =10246.79 =10246.44 # =# # =10246.44 =10239.54 =10239.54 = 9839.29 = 9839.29 = 9835.21 # # --# 9835.21 = 9433.76 # # = 1 =2 3/8" 4.6# N-80 BUTT PUP # .... # .... #=== F = 11 =2 3/8" 4.6# N-80 BUTT TBG # .... # .... # G = 1 =2 3/8" 4.6# N-80 BUTT PUP # .... #====#=_ = 21 =2 3/8" 4.6# N-80 BUTT TBG # .... # .... #-- = 1 =2 3/8" 4.6# N-80 BUTT PUP # .... # .... # H = 19 =2 3/8" 4.6# N-80 BUTT TBG # .... # .... # 4.09 = 9433.76 = 9429.67 # # # 338.17 = 9429~67 = 9091.50 # # # 6.12 = 9091.50 = 9085.38 # # 646.84 = 9085.38 = 8438.54 # # # 5.12 = 8438.54 = 8433.42 #-- # # 585.54 = 8433.42 = 7847.88 # # # I = 1 =2 3/8" 4.6# N-80 BUTT PUP # .... # .... # = 5.10 = 7847.88 = 7842.78 # # # # L = 16 =2 3/8" 4.6# N-80 BUTT TBG = 494.01 = 7842.78 = 7348.77 # .... # .... # # # # # I = 1 =2 3/8" 4.6# N-80 BUTT PUP # ....# .... # L = 6 =2 3/8" 4.6# N-gO BUTT TBG # ....# .... #=== I = 1 =2 3/8" 4.6# N-80 BUTT PUP # ....# .... # L = 6 =2 3/8" 4.6# N-80 BUTT TBG = 3.11 = 7348.77 = 7345.66 # # # # = 185.23 = 7345.66 = 7160.43 . # # :# =# = 5.07 = 7160.43 = 7155.36 = 186.29 = 7155.36 = 6969.07 # ....# .... # .......... I = 1 =2 3/8 BUTT x 2 7/8 BUTT XO # ....# .... # L =222 =2 7/8' 6.4# N-80 BUTT TBG # ....# .... # I = 1 =2 7/8' 6.4# N-80 BUTT PUP # ....# .... # ........ __# ........ # # = 1.05 = 6969.07 = 6968.02 # # #- =6908.73 = 6968.02 = 59.29 = 5.50 = 59.29 = 53.79 L = 1 =2 7/8' 6.4# N-80 BUTT PUP = # ....# .... # I = 1 =2 7/8' 6.4# N-80 BUTT PUP = # ....# .... # # L = 1 =2 7/8 BUTT x 3 1/2 8RD = # .... # .... # ............. # I = 1 =TUBING HANGER = # .... # .... # # L TM 1 =LANDED BELOW ZERO = # .... # .... # ....... 4.14 = 53.79 = 49.65 # # ==# 6.20 = 49.65 = 43.45 # # # 0.45 = 43.45 = 43.00 1.00 = 43.00 = 42.00 42.00 = 42.00 = 0.00 BRUCE 17587 WELL #6 LONG STRING 1-31-91 ITEM= NO = DESCRIPTION # .... # .... # A = 1 =WL Re-entry Guide # .... # .... # .................... = 12 =2 3/8" 6.5# N-80 BUTT TBG # ....# .... # B = 1 =2 3/8 BUTT x 2 7/8 8RD XO # ....# .... # C = 1 =KOBE TYPE "B" 2 1/2" BHA # .... # .... # = LENGTH = BOTTOM = TOP # # # =# = 0.65 =10641.27 =10640.62 # # # =# = 374.04 =10640.62 =10266.58 # # =# =# = 0.87 =10266.58 =10265.71 # # # -=# = 19.00 =10265.71 =10246.71 # # # --# D = 1 =2 7/8" 8RD x ~2 7/8" BUTT BOX = # ....# .... # # 8.25 =10246.71 =10238.46 # # # =327 =2 7/8" 6.4# N-80 BUTT TBG # .... # .... # =10181.6 =10238.46 = 56.84 # # # ==# 2.95 = 56.84 = 53.89 = 1 =2 7/8" 6.4# N-80 BUTT PUP = # .... # .... # ........ # = 1 =2 7/8" 6.4# N-80 BUTT PUP = # .... # .... # ....... # 4.29 = 53.89 = 49.60 # # # = 1 =2 7/8" 6.4# N-80 BUTT PUP = # ....# .... # =# E = 1 =2 7/8" BUTT x 3 1/2 8RD XO = # .... # .... # # = 1 =CIW 10" 5M DUAL TBG HGR = # .... # .... # # = =LANDED BELOW ZERO # .... # .... # 6.20 = 49.60 = 43.40 =# # =# 0.40 = 43.40 = 43.00 # # ==# 1.00 = 43.00 = 42.00 # # ==# = 42.00 = 42.00 = -0.00 # # # # LONG STRING GROSS WT W/ BLOCKS 65,000# LANDED WITH 12,000# OVER PULL HYDROTESTED ALL TUBING TO 4500 PSI DRIFTED AT 2.34" NOTE: 327 JTS RAN FROM DERRICK USING API MODIFIED BREAKS ON 1/3 AND 2/3 WERE RUN USING THREAD MASTERS DOPE THESE WILL TAKE 4,000 TO 5,000 FT/LBS TO BREAK MIGHT HAVE SOME GALDING PROBLEMS SHORT STRING GROSS WT W/ BLOCKS 55,000# HYDROTESTED TO 4500 PSI DRIFTED TO 1.9" NOTE: SAME AS LONG STRING ON BREAKS 1/3 AND 2/3 20' C$C · 816' 13 3/s'. ~ sa# c$c ~ 33~3' \ 9 5Iff', 4;' ~: 53,$# C$C $£T AT 7803' 5/g', 39~ LINRR FROM 7'434' - 10. 64~' / 10,305'- ~.400' PBTD f 2,270' TO 12,434' Z B. BRUCE 'WELL #6- ! 7587 EG f, SLOT 7 SPUD WORK OVER COMPLETED 3 ~ -JAN- 9 f LARRY McCALLISTER, DRILLINC FORMAN "~ MARTY LYNCH, DRILLING FOREMAN LONC STRINC 42 43 43.40 10, 238' 10,246' 10,265' 10,266' 10,641' SHORT STPJNC 43' A. 3 1/,2'-8RD 43.45' B. 222 Jo{~t= ~ 7/~-6.4~ N-80 B~t~e~ ~ j~t ~l~) ~,968' C. 2 7/~ B~t~ss X 2 6,969' D. 105 j~ ~ 3/~-4.6~ N-80 But~== ~bg (see ~b~. ~ta~) 10,~4~ ff. 2 3/~ 10, R46' 5. Kobe C=~ NOTE: 327 JT$ r=n fro~ Drk. AP1 Mo& Tbg. dope, even st=~. BreWs ~ 1/3 ' Tkread M~ter~ d~e. Tkese ~e~s ~ill t~e 4,000-5,000 ft/lbs to ~e~, ~igkt ha~e s~e galdi~g ~oble~. M. Ly~ck CEM£NT RE?AINNR 0 fO, 900' C-$: 11,.058°- 11,08R° MAX INCLINATION 57.2 DEG. C-7: f1,42.9' -- 1f,796' C-3:11,827°- 12,217' UNOCAL 2--8--9I tuUr STATE OF ALASKA ALA~ lOlL AND GAS CONSERVATION COMMIS'~. ., REPORT OF SUNDRY WELL OPERATIONS RI Gl 1. Ope!ations performed: Operation shutdown __ Stimulate __ Plugging __ ~: , Pull tubing _2[ Alter casing ~ Repair well x Perforate _.~ Pull tubing __ Other 2. Name of Operator ( UNOCAT. ) Union Oil Company of California 3. Address P.O. BOX 190247, Anch., AK, 99519 4. Location of well at surface Leg #1, SlOt 7, 2050' FSL & 2015' FWL, Sec. 31, At top ofproductive interval 1250' FWL & 2150' FSL, Sec. 30, At effective depth 5. Type of Well: Development _~ Exploratory __ Stratigraphic __ Service __ ~latform Bruce TllN, RllW, SM TllN, RllW, SM ~~eP~WL & 2150' FSL, Sec. 30, TllN, RllW, SM 6. Datumelevation(DF-orKB) 115' feet ZUnitorPrope~yname Granite Pt 17587 8. Well number No. 6 9. Permit number/approval number 89-103/~ 10. APl number ~' ~ie~eP~°la i/Gr an i t e Pt. 12. Present well condition summary Total depth: measured true vertical 12,434 10,360 f~t ~et Plugs (measured) Effective depth: measured 11,0 2 0 feet Junk (measured) true vertical 8,2 4 9 feet Cement plug from 12434'-12270' EZSV Bridge plug @ 11,020' Casing Length Size Cemented Structural 570' 20" 1040 SX Conductor 3919' 13-3/8" 3000 SX Sudace 7758 ' 9-5/8" 1000 sx Intermedi~.iner) 3211' 7-5/8" 700 sx Production 2095 ' 5-1/2" 408 SX Liner Perforation depth: measured See attachment #1 Measureddepth ~ueverticaldepth 616' 615' 3963' 3307' 7803' 5971' 7434'-10,645' 8575' 10,305'-12,400' 10,327' true vertical L.S. 2-7/8", N-80, 6.4# Tubing (size. grade, and measured depth) S.S. 2-7/8", 2-3/8" N-80 Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary @ 10,417' to 10,272' [ Ci IV D ,-,,-u z 8 ig O 14. 10,772'-10,816' :~" . ,Oil & Gas Cons. C0mmissi0 Intervals treated (measured) ...... ArJchorage Treatment description including volumes used and final pressure Fracture stimulated with 16,137 20-40 carbolite maximum Dress. 9000 Psi. Repre,~entative Daily Average ProductiOn or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 0 0 0 0 0 - - - 0 0 15. Attachments Copies of Logs and Surveys run x__ Daily Report of Well Operations ~ 16. Status of well classification as: Oil ~ Gas_ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~.~. Gary ~ Bush ~ Regional Signed k, A¢..~ ~, ~,,,,,.~. Title Form 10-404 Rev 0e/1~8 (~ Drilling Manager Date t 2.. - \ ~ ~ % ~ SUBMIT IN DUPLICATE Attachment #1 Perforated the following intervals on 2/8/90 using Carrier with Vann 32 Gram perforating charges, 4 phasing, 0.56" diameter: 3-3/8" Hollow SPF, 90 deg. Measured Depth Top Bottom True Vertical Depth Top Bottom 10,770' 10,812' 8,700' 8,742' 11,058' 11,082' 8,988' 9,012' 11,429' 11,454' 9,358' 9,383' 11,460' 11,469' 9,389' 9,398' 11,501' 11,525' 9,430' 9,454' 11,578' 11,592' 9,507' 9,521' 11,612' 11,673' 9,540' 9,601' 11,696' 11,726' 9,624' 9,654' 11,738' 10,750' 9,666' 9,678' 11,778' 11,796' 9,706' 9,724' 11,827' 11,844' 9,755' 9,772' 11,852' 11,916' 9,780' 9,844' 12,090' 12,145' 10,017' 10,073' 12,152' 12,217' 10,080' 10,144' Reperforated the following interval using Halliburton wireline guns 6 SPF, 60 degree phasing and 0.5" holes. Measured Depth True Vertical Depth Top Bottom Top Bottom 10,772' 10,816' 8,701' 8,745' LEG 1, BRUCE SLOT 7 WELL # 6-7 SPUD 10/25/89 20" CSG 0 816' 73 3/8", e8¢ cs¢ 0 3963' LONG STRING: 1. CIW DCBS TUBING HANGER ~ 4.2' 2. 2-7/8" X 3-1/2" XO ~ 43' 3. 2-7/8" BUTTRESS TO 10,263' 4. 2-7/8" BUTT x 2-7/8" 8RD XO ~ 10,263' 5. KOBE 2-1/2" TYPE "B" CAVITY ~ 10,271' 6. 2-7/8" BUTT X 2-7/8" 8RD XO 0 10,290' 7. 2-7/8" BUTT TBG TO 10,4.16' 8. WlRELINE RE-ENTRY GUIDE AT 10,417' 9 5/8-, 47 ~ 53.5# CSG SET AT 7803' 7 5/8" 39# LINER FROM 7434'- 10,645' MAX INCLINATION 57.2 BEG 5 1/2", 20# LINER FROM 10,305' - 12400' PB'rD 12,270' 'rD 12,434' SHORT STRING: A, 3-1,/2" BLrl'r x 2-7/8" BUTI' XO 42' B. 2-7/8" 6.4#, N-80 BUTT TO 7056' C. 2-3/8" X 2-7/8" BUTT ×0 AT 7057' D. 2-3/8" 4.6~ N-80 BUTT TO 10,271' E. 1-1/2" 8RD x 2-3/8" BUTT ×0 AT 10,271' C-2: 10,770'- 10,816' CEMENT RETAINER ~ 10,900' C-5: 11,058' - 11,082' C-7: 11,4.29' - 11,796' C-8: 11,827' - 12,217' GRB 12/05/90 DATE MW PLATFORM BRUCE ADL 17587 WELL #6 ETD COMMENTS 10/30/90 10/31/90 11/01/90 64 12,270' DPM 64 12,270' DPM 64 12,270' DPM COMMENCED OPERATIONS ON WELL #6, ADL 17587 AT 0001 HRS. HELD A SAFETY MEETING. INSTALLED SCREENS ON #1 SHAKER, (PLAN TO USE PITS #3, 4, 5, 6). PIT #2 HAS A SLOW LEAK IN THE DUMP VALVE AND A THIN BO~-FOM. RIGGED UP AND TESTED ALL HIGH PRESSURE PUMP LINES, KELLY, AND CHOKE MANIFOLD TO 250 PSI, 3200 PSI. REPLACED GUTS ON 4" STAND PIPE VALVE. REPAIRED 2" VALVE, CHANGED OUT THE SWIVEL PACKING. RETESTED ALL EQUIP., OK. MIXED DRILL WATER TO 5% KCL, 64 PCF. RIGGED UP ON WELL TO KILL. PRESSURE TESTED TO 1000 PSI, PUMPED 34 BBLS DOWN THE S.S. 9- 5/8" ANNULUS CHOKE NOT RESPONDING RE-BUILT TO A 7/8" OPENING. FINISHED INSTALLING CSG CHOKE AND TESTED TO 1200 PSI. PUMPED 70 BBLS KILL FLUID DOWN THE S.S. TAKING ANNULUS RETURNSTO PRODUCTION. PUMPED DOWN THE LONG STRING TAKING ANNULUS RETURNS TO PRODUCTION. ANNULUS AND L.S. WERE STABLE. SS WAS FLOWING PUMPED THE S.S. TUBING CAPACITY, WELL NOW STABLE. REMOVED DUAL WELL HEAD MANIFOLD TO INSTALL BPV'S. INSTALLED THE BPV'S. REMOVED THE TREE. INSTALLED THE BOP'S. MODIFIED THE FLOW & KILL LINES. INSTALLED 2-7/8" RAMS ON TOP. 2-3/8" RAMS IN THE MIDDLE AND BLIND RAMS ON THE BOTTOM. BEGAN HOOKING UP THE ACCUMULATOR LINES. FINISHED HOOKING UP THE ACCUMULATOR LINES. PREPARED TO TEST BOP'S. THE ACCUMULATOR REGULATOR DID NOT FUNCTION PROPERLY. APPARENTLY AMOCO HAD TROUBLE WITH THIS BEFORE. ORDERED A NEW REGULATOR. INSTALLED THE 2-WAY BPV IN THE L.S. ATTEMPTED TO TEST THE BOP'S. THE 4" SHAFFER VALVE ON THE CHOKE LINE LEAKED. REPAIRED THE VALVE. TESTED THE ANNULAR TO 250'-2500 PSI. TESTED HCR, CHOKE MANIFOLD, 2 KILL SIDE MANUALS, CHK VALVE, UPPER PIPE RAM (2-7/8'% CHOKE VALVES TO 250 & 3000 PSI, OK. RIGGED DOWN THE TEST JOINT. PULLED THE 2- WAY BPV (L.S). RIH (S.S) WITH A 2-1/4" GAUGE RING. RIH W/1-11/16" JET CU'I-rER, CUT AT 10,181' W.L.M. TUBING CAME APART. ATTEMPTED TO POOH WITH THE SPENT CUTTER. UNABLE TO ENTER THE TUBING TAIL. PLATFORM BRUCE ADL 17587 WELL #6 PAGE 2 DATE MW ETD COMMENTS 11/02/90 64 12,270' DPM 11/03/90 64.3 12,270' DPM 11/04/90 64.3 12,270' DPM 11/05/90 64.4 12,270 DPM WORKED THE APRS TUBING CU'I-i'ER INTO THE TUBING TAIL AND POOH. CIRCULATED THE HOLE SENDING THE FIRST 25 BBLS OF OILY FLUID TO PROD. BEGAN TO PULL AND LAY DOWN THE SHORT STRING. SLIGHT FLOW BACK. CIRC. NO FLOW. POOH AND LAY DOWN THE S.S. RECOVERED 242 JTS OF 2-7/8" AND 89 JTS + 1 CUTOFF JOINT OF 2-3/8". P/U THE LANDING JOINT AND MADE UP TO THE TBG HANGER. BROKE OUT THE LOCK DOWN SCREWS. CIRC. ATTEMPTED TO PULL THE L.S. THE STRING PARTED 1 PUP JOINT (6' DOWN FROM THE TUBING HGR). MONITORED THE WELL. RIH WITH AN 8" GUIDE SHOE, 5-3/4" X 6-1/4 O.S. & 2-7/8" GRAPPLE. ENGAGED FISH AT 67'. RIG UP W. L. AND RIH WITH A FREE POINT. TUBING FREE TO 10,670', UNABLE TO GO PAST 10,729' TBG MEASUREMENT. RIH WITH A 2- 1/4" JET CUTTER, UNABLE TO GO THROUGH THE KOBE CAVITY. LOCATED AND CUT THE L.S. @ 10,142' (ABOVE THE KOBE CAVITY AND THE S.S. CUT @ 10,181'). CIRC. WELL, 120 UNITS OF GAS, DISSIPATED. POOH WITH THE L.S. (POWER STRING) AND LAID DOWN. CONTINUED TO POOH WITH THE 2-7/8" L.S. RECOVERED AND LAID DOWN 330 JTS, 17 PUPS AND 1 CUT OFF JOINT FOR A TOTAL OF 10,107'. CHANGED TOP RAMS TO 3-1/2" AND TESTED. RIH WITH FISHING ASSEMBLY #2, SAME CONFIGURATION AS ASSEMBLY #1 ONLY WITH JARS AND AN ACCELERATOR. CONTINUED TO RIH WITH THE FISHING ASSEMBLY ON 3-1/2" PH-6 HYDRIL. DRESSED AND ENGAGED THE FISH AT 10,142'. JARRED ON FISH. FISH CAME FREE. PULLED 10 STANDS (INTO 7-5/8" LINER) CIRC. 82 UNITS GAS. POOH AND LAID DOWN ENTIRE FISH. THERE WERE NO MISFIRES IN THE GUNS. FOUND COMPACTED SAND IN 4 2-3/8" PUP JOINTS ABOVE THE PERF ASSEMBLY (10,733'- 10,768') DIL. FOUND SAND IN THE GUNS (11,696'-11,726') DIL. FOUND OIL IN THE GUNS (11,827'-11,844') (11,852'-11,916') (11,778'-11,796') D~L. RECOVERED 60 JTS 2- 7/8" TBG, 3 XO'S, 1 PORT SUB, 4 2-3/8" DATE MW 11/05/90 (CONT) 11/06/90 64.2 11/07/90 64.5 11/08/90 64.3 11/09/90 64.3 PLATFORM BRUCE ADL 17587 WELL #6 PAGE 3 ETD COMMENTS PUPS, 2 XO'S, 1 CUT OFF 2-3/8", 1-1/2" PUP, 1 CUT OFF 2-3/8", 1 XO, KOBE CAVITY. PREP TO TEST THE DOPE TO 5000 PSI. WORKED ON ACCUMULATOR REGULATOR. 12,270' DPM TESTED THE UPPER PIPE RAMS, CHOKE MANIFOLD, HCR VALVE, CHOKE LINE MANUAL, KILL LINE VALVES AND THE CHECK VALVE TO 5000 PSI, OK. BEGAN TO TEST THE BLIND RAMS. THE TEST PUMP GAVE OUT, LEAKING. GETTING TEST PUMP FROM THE GRAYLING. PICKING UP 2-7/8" WORK STRING FOR THE 5-1/2" LINER WORK. GOT THE PUMP AND FINISHED THE DOPE TEST. TESTED THE PIPE RAMS, BLIND RAMS, KELLEY AND STAND PIPE VALVES TO 5000 PSI, OK. RIH WITH A 5-1/2" BIT AND SCRAPER ON 2-7/8" X 3-1/2" TAPERED TUBING STRING. RIH TO 11,100' AND CIRC. POOH. 11,020' TBG CONTINUED POOH W/ 5-1/2" BIT AND SCRAPER. RIH AND SET A 5-1/2" EZSV BRIDGE PLUG AT 11,020' TBG MEASUREMENT. PRESSURED UP TO 4000 PSI AND SHEARED OUT OF THE BRIDGE PLUG. CIRCULATED AT 11,020' AND FILTERED FLUID AT 3.3 BPM. TURBIDITY AT THE START WAS 350 NTU. THE FINAL TURBIDITY WAS 175 NTU AFTER 9 HRS OF FILTERING. THE PROBLEM WAS OIL ENTRAINMENT IN THE BRINE. CONTINUED TO ClRC AT 11,010'. UNLOADED AND SET FRAC EQUIPMENT USING WOOD CRIBBING. 11,020' TBG FINISHED SETTING THE FRAC EQUIPMENT. POOH WITH THE TBG. RIGGED UP HALLIBURTON WIRELINE SERVICES FOR A TEMPERATURE/GR LOG. RAN A TEMP/GR LOG FROM 11,020'-3,000'. WIRELINE PERFORATED 10,795'-10,816' (21') AND 10,772'-10,795' (23), 6 SPF, 60 DEGREE PHASING .5" HOLES. RIGGED DOWN W/L. RIH WITH A 4-5/8" BIT, 5-1/2" SCRAPER. 11,020' DPM CONT IN HOLE WITH A 4-5/8" BIT AND 5-1/2" SCRAPER. TAGGED ETD AT 11,020'. PULLED UP TO 10,300'. CIRC. MAX GAS WAS 2000 UNITS. RIH TO ETD. CIRC. POOH. RIH WITH 2-7/8" TBG TAIL 5-1/2" RTTS W/BYPASS. HALLIBURTON LUBRICATOR ONLY GOOD TO 6000 PSI. RIGGED UP 10,000 PSI LUBRICATOR HAD TO WAIT ON A X-OVER TO DOWELLS FRAC HEAD. RUNNING UP AGAINST THE 56 MAN DATE MW PLATFORM BRUCE ADL 17587 WELL #6 ETD COMMENTS PAGE 4 11/09/90 (CONT) 11/10/90 64.3 1.1 / 11/90 64.3 11/12/90 64.3 11,020' DPM 11,020' DPM 11,020' DPM BRUCKER CAPACITY. SHIPPING PEOPLE TO THE BEACH AND TO ANNA. POOH. RIH WITH OPEN ENDED TBG TO 11,014', CIRC. POOH. RIH WITH 310' 2-7/8" TBG TAIL, 5-1/2" RTTS, 180' 2-7/8" TBG, SCHLUMBERGER BUNDLE CARRIER WITH 10 & 60 SEC MEMORY GAUGES. RIH TO 4842'. FOUND OUT THAT HALLIBURTONS HP QUARTZ GAUGES WERE NOT SUITABLE, THEY ARE NOT ACCURATE AFTER A TEMPERATURE CHANGE. LOCATED HALLIBURTON GRC GAUGE ON THE SLOPE. POOH. RE-PROGRAMMED BUNDLE CARRIER GAUGES. MONITORED WELL. CONT TO WAIT ON GRC GAUGES. RIH WITH FRAC STRING TO 8628'. WHILE CALIBRATING THE GRC GAUGES ON THE SURFACE THE IMPULSE CORD AND BATTERY HOUSING SHORTED OUT DISABLING THE W.L. UNIT. UNABLE TO LOCATE USABLE GAUGES. RIH TO 10,580'. CIRC. POOH. RELOADED SCHLUMBERGER MEMORY GAUGES AT 2-SECOND INCREMENTS (FOR DATA FRAC) RIH TO 10,705'. REV OUT TBG VOLUME TO CLEAR OF PIPE DOPE. SET RTTS AT 10,382', BUNDLE CARRIER AT 10,175'. TESTED RTTS TO 2000 PSI OK. RIGGED UP THE DOWELL FRAC HEAD. FINISHED R/U DOWELL. PRIMED TURBINES. PRESSURE TESTED THE DOWELL EQUIP TO 11,300 PSI. CAUGHT 2250 PSI ON THE ANNULUS. PERFORMED AN INJECTIVlTY TEST ON THE C-2 PERFS FROM 10,770'- 10,816' WITH 80 BBLS WF-40. FSlP 545 PSI IN 5 MIN. ISlP 2200 PSI. MAX PRESSURE RATE 8775 19 BPM 8320 2O BPM PERFORMED A STEP RATE TEST WITH 144 BBS WF-40 FROM 2-20 BPM. MAXIMUM PRESSURE 5365 PSI, ISlP 2105 PSI, FSlP 920 PSI IN 10 MIN. PERFORMED A DATA FRAC WITH 100 BBLS OF YF-140D W/RA TRACER. FOLLOWED W/50 BBLS YR-140, DISPLACED W/79 BBLS WF-40, MAX PRESS 5740 PSI AT 20 BPM, ISIP 2260, FSIP 780 IN 45 MIN. R/D DOWELL, R/U HOWCO W.L. FOR TEMP GR. DATE MW PLATFORM BRUCE ADL 17587 WELL #6 ETD COMMENTS PAGE 5 11/12/90 (CONT) 11/14/90 65.1 11/15/90 65.1 11/16/90 65.0 11,020 DPM 11,020 DPM 11,020 DPM FOOTAGE COUNTER BROKEN ON 7/32" LINE RE-HEAD TO 5/16" LINE. UNABLE TO WORK THROUGH THE SCHLUMBERGER BUNDLE CARRIER AT 10,170'. THIS HAD DRIFTED A 1"-11/16" TOOL ON THE SURFACE. POOH W/W.L. UNSEATED THE RTTS AT 10,382'. CBU. POOH W/FRAC STRING. RU W.L. RAN TEMP/GR FROM 11,020' TO 10,200'. R/D W.L. SLIPPED AND CUT DRLG LINE. RIH W/FRAC STRING. GAUGES SET AT 10 SEC/10 SEC WITH A 4 HR DELAY. RIH WITH FRAC STRING TO 10,645'. REV OUT TBG VOLUME. HAVE FISH EYES IN THE FRAC FLUID. SHEARED FRAC FLUID THROUGH THE TURBINES. SET R~-FS WITH 25,000#, WITH 2-7/8" TBG TAIL AT 10,458, 5-1/2" RTTS AT 10,360', BUNDLE CARRIER AT 10,182'. TESTED RTTS TO 2000 PSI. R/U DOWELL SURFACE EQUIP. FINISHED SHEARING FRAC FLUID, TESTED DOWELL LINES TO 11,500 PSI, PUMPED 307 BBLS 40# PAD WITH A MAX PRESSURE 8120 PSI AT 20 BPM, 15-BBL 2# 20/40 CARBOLITE SAND, 15 BBLS 5# 20/40 CARBOLITE, 15 BBLS 8# 20/40 CARBOLITE, 11 BBLS 12# 20/40 CARBOLITE. BLENDER PLUGGED WITH A CHUNK OF FROZEN PROPPANT. 16,137# SAND PUMPED. DISPLACED WITH 82 BBLS WF-40 FLUID TO 10,545. ISlP 2420 PSI. MONITORED PRESSURE 8-1/2 HRS FSlP 410 PSI. UNSEATED RTTS AND PULLED UP TO 10,290'. CIRC. WELL FLOWING. WEIGHTED UP TO 65.1 PCF. CONT'D CIRC. WELL STABLE. POOH. LAID DOWN BUNDLE CARRIER AND RTTS. TEST THE BOPE TO 250 PSI LOW AND 3200 PSI HIGH. RIH WITH OPEN ENDED 2-7/8" X 3-1/2" WORK STRING AND TAGGED THE RETAINER AT 11,020'. NO SAND. REVERSE CIRCULATE, NO SAND. REVERSE CIRCULATED TWO TUBING VOLUMES, NO SAND. POOH TO 10,770'. MONITORED WELL - OK. POOH. CHANGED RAMS TO RUN THE COMPLETION. TESTED RAMS. RIGGED UP HYDROTEST. TESTED KOBE CAVITY TO 4000 PSI. RIH WITH W.L. RE-ENTRY GUIDE ON 4 JTS 2-7/8" TBG TAIL. RIH. RIH WITH DUAL 2-7/8" X 2-3/8" COMPLETION & HYDROTESTED TO 4000 PSI. DATE 11/17/90 MW 65.0 PLATFORM BRUCE ADL 17587 WELL #6 PAGE 6 ETD 11,020 DPM COMMENTS CONTINUED RUNNING THE DUAL COMPLETION. HYDRO-TESTED BOTH STRINGS TO 4000 PSI. PICKED UP THE TUBING HANGER. INSTALLED THE BPV'S AND LANDED THE TUBING. REMOVED THE BPV'S AND CIRC DOWN THE L.S. TAKING RETURNS FROM THE S.S. DROPPED THE KOBE STANDING VALVE AND PUMPED IT INTO PLACE. SHUT IN THE S.S. AND PRESSURED THE L.S. TO 2000 PSI, OK. LAID DOWN THE LANDING JOINTS - REINSTALLED BPV'S. REMOVED THE BOPE AND INSTALLED THE TREE. PRESSURE TESTED THE TREE TO 5000 PSI FOR 30 MIN, OK. REMOVED BPV'S. DROPPED KOBE PUMP DOWN THE L.S. AND PUMPED TO THE KOBE CAVITY. VERIFIED THAT THE COMPLETION IS FUNCTIONAL. RELEASED THE RIG AT 2400 HRS. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well .._x Change approved program __ Puli tubing ~ Variance __ 2. Name of Operator I 5. Type of Well: ( UNOCAL ) Development x TT'~4 ,,'"~'~ /'~'"J 1 ~.~=~. ~: ~=l -J -F,,-,-,,.,,.-.-J .~ Exploratory__ 3. ~,~'d-~e"s's' ........ ~' -' '~ ............. J Stratigraphic __ P.C). Ro~r 1 90247. Anch.. AE. 9951 gJ Service__ Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate Perforate __ Other .x_ 4. Location of well at surface Leg #1, Slot 7, Platform Bruce 2050' FSL & 2015' FWL, Sec. 31, TllN, RllW, SM At top of productive interval 1227' FWL & 2204' FSL Sec. 30, TllN, RllW, SM At effective depth 1271' FWL & 2092' FSL Sec. 30, TllN, RllW, SM At total depth 1250' FWL & 2150' FSL, Sec. 30, TllN, RllW, SM 6. Datum elevation (DF or KB) 115' 7. Unit or Property name Grani 'i-_~. P~ 1 7~R7 8. Well number No. 6 feet 9. Permit number 89-103 10. APl number 5O883-1OO34 11. Field/Pool Mid Kenai/Granite Pt. 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12,434 10,360 feet Plugs(measured) feet 12,270 feet Junk(measured) 10,197 feet Cement plug from 12434'-12270' EZSV Bridge plug @ 11,020' Casing Length Structural Conductor 570 ' 3929' Sudace 7758' Intermediat(eLiner ) 3211 ' Production 2095 ' Liner Perforation depth : measured Size Cemented Measureddepth ~ueverticaldepth 20" 1040 SX 616' 615' 13-3/8" 3000 SX 3963' 3307' 9-5/8" 1000 SX 7803' 5971' 7-5/8" 700 SX 7434'-10,645' 8575' 5-1/2" 408 SX 10,305'-12,400' 10,327' true vertical L.S. Tubing (size. grade, and measured depth) S. S. Packers and SSSV (type and measured depth) See attachment # 1 ...ii.~ · 2-7/8", N-80, 6.4# @ 10,417' 2-7/8" 2-3/8" N-80 to 10,2~_ I ~ .~. ' '~ -51 · 'e ' BO Detail doperat~onsprogram ~ Psk h I 13. Attachments Description summary of proposal __ 14. Estimated date fo~' comm~e0cing ~_p¢~aSon 15. Status of well classification as: uecemDer zl ~ 16. If proposal was verbally approved Oilx__ Gas __ Suspended __ Name of approver Date approved ~ Service 17. I hereby certify that the foreg~iq,.g is true and correct to the best of my knowledge. Signed'~r'Zk GARY S. BU~~"~,, ~~ REGIONAL DRILLING MANAGERDate , z. - ~,-'t - °1 o ( L..D FOR USE ONLY ~ COMMISSION Conditions of approval: Notify Commission so representative may witness J Approval No. ¢~) Plug integrity __ BOP Test __ Location clearance __ Z)/(). Mechanical Integrity Test __ Subsequent form required 10- ORIGINAL SIGNED B'~ LONNIE C. SMtTH~' Approved by order of the Commission Form 10-403 Rev 06/15/88 Approved Copy Returned / Commissioner Attachment #1 Perforated the following intervals on 2/8/90 using 3-3/8" Hollow Carrier with Vann 32 Gram perforating charges, 4 SPF, 90 deg. phasing, 0.56" diameter: Measured Depth Top Bottom True Vertical Depth Top Bottom 10,770' 10,812' 8,700' 8,742' 11,058' 11,082' 8,988' 9,012' 11,429' 11,454' 9,358' 9,383' 11,460' 11,469' 9,389' 9,398' 11,501' 11,525' 9,430' 9,454' 11,578' 11,592' 9,507' 9,521' 11,612' 11,673' 9,540' 9,601' 11,696' 11,726' 9,624' 9,654' 11,738' 10,750' 9,666' 9,678' 11,778' 11,796' 9,706' 9,724' 11,827' 11,844' 9,755' 9,772' 11,852' 11,916' 9,780' 9,844' 12,090' 12,145' 10,017' 10,073' 12,152' 12,217' 10,080' 10,144' Reperforated the following interval using Halliburton wireline guns 6 SPF, 60 degree phasing and 0.5" holes. Measured Depth True Vertical Depth Top Bottom Top Bottom 10,772' 10,816' 8,701( ~,745' · · · · · · · · · PROCEDURE Skid Rig and Rig up on Leg 1, Slot 7. Kill the well by circulating weighted brine. Install and test the 13-3/8" 5000 # BOPE to 3000 psi. Recover dual completion. RIH and clean out to 10,900'. Make a bit and scraper run. RIH and gravel pack the C-2 sand from 10,770'-10,816' with 20- 40 carbo-prop. RIH with a dual 2-7/8" hydraulic completion assembly. Begin production. Estimated 10 days. PLATFORM BRUCE DRILLING STACK PITCHER NIPPLE- 16" ID WI IO' FLOWLINE ANNULAR BOP HYDRIL 13 5/8" 5000 PSI DBL GATE BOP "NL SHAFFER" 13 5/8" 5000 PSI MUD CROSS- 13 5/8" BORE W/4" 5000 PSI VALVES & CK SGL, GATE BOP CAMERON 13 5/8" 5000 PSI RISER 18"0D 13 5/8" 5000 FLG LOWER RISER 11" ID W/lO" 5000 PSI FLG (RX-54) LEG BRUCE 1, SLOT 7 WELL # 6-7 SPUD 10/25/89 20" CSG O 816' 13 3/8", es# csG o 3963' LONG STRING: 1, ClW DCBS TUBING HANGER ~ 4,2' 2. 2-7/8"X 3-1/2" XO @ 43' 3. 2-7/8" BUTTRESS TO 10,263' 4. 2-7/8" BUTI' x 2-7/8" 8RD XO ~ 10,263' 5. KOBE 2-1/2" TYPE "B" CAVITY ~ 10,271' 6. 2-7/8" BLrI-I' X 2-7/8" 8RD XO O 10,290' 7. 2-7/8" BUTT TBG TO 10,416' 8. WIRELINE RE-ENTRY GUIDE AT 10,417' 9 5/8", 447 · 53.5~ cs¢ SET AT 7803' 7 5/8" 39# LINER FROM 7434'- 10,645' MAX INCLINATION 57.2 BEG 5 1/2", 20~t LINER FROM 10,305' - 12'~00' PBTO 12,270' TI3 12,4344' SHORT STRING: A. 3-1~/2" BUTT x 2-7/8" BUTI' ×0 42' a. 2-7/8" 6.4#, N-SO BUTT TO 7056' C. 2-3/8" X 2-7/8" BUTT XO AT 7057' D. 2-3/8" 4.6~ N-80 BUTT TO 10,271' E. 1-1/2" aRD x 2-3/8" BUTT XO AT 10,271' C-2: 10,770'- 10,816' CEMENT RETAINER O 10,900' C-5: 11,058' - 11,082' C-7: 11,4429' - 11,796' C-8: 11,827' - 12,217' GRB 12/05/90 LEG BRUCE 1, SLOT 7 WELL # 6-7 PROPOSED SPUD 1 10/25/89 20" CSG O 816' 13 3/8", 68# CS(; O 3963' LONG STRING: 1. ClW DCBS TUBING HANGER (~ 42' 2. 2-7/8"X 3-1/2" XO ~ 43' 3. 2-7/8" BUTTRESS TO 10,263' 4. 2-7/8" BUTT x 2-7/8" 8RD XO ~ 10,263' 5. KOBE 2-1/2" TYPE "B" CAVITY ~ 10,271' 6. 2-7/8" BUTT X 2-7/8" 8RD XO O 10,290' 7. 2-7/8" BUTT TBG TO 10,416' 8. WlRELINE RE-ENTRY GUIDE AT 10,417' 9 5/8", 47 a 53.5# CSG SET AT 7803' SHORT STRING: A. 3-1./2" BUTT x 2-7/8" BUll' ×0 42' B. 2-7/8" 6.4~, N-80 BUTT TO 7056' C. 2-3/8" X 2-7/8" BUTT ×0 AT 7057' D. 2-3/8" 4.6# N-SO BUTt TO 10,271' E. 1-1/2" 8RD x 2-3/8" BUTT XO AT 10,271' 7 5/8" 39# LINER FROM 7434'- 10,645' MAX INCLINATION 57.2 DEG 5 1/2", 20# LINER FROM 10,305' - 12400' PBTD 12,270' TD 12,434' BAKER STAINLESS STEEL WIRE WRAPPED SCREEN FROM +/- 10,750' TO +/- 10,830' C-2: 10,770'- 10,816' CEMENT RETAINER · 10,900' C-5: 11,058' - 11.082' C-7: 11,429' - 11,796' C-8: 11,827' - 12;217' CRB 12/05/90 STATE OF ALASKA 0 I 6 I A ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well __ Change approved program __ Pull tubing __ Variance __ 2. Name.qf Operator_. J UnlOn ull Company of Californ~l~' I'u~~ent'-~-~ ! Exploratory __ 3'Addre~.o. BOX 190247, Anch., AK, 99~19-02~r~i~rPv~;;- Operation shutdown __ Re-enter suspended well x Plugging __ Time extension __ Stimulate ~ Perforate ~ Other 6. Datum elevat~_~F or KB) 7Gt'~:~riP~r'~e ~/'~ a r~ e/587 feet 4.~cationofwellatsudace Leg #1, Slot 7, Platform Bruce 2050' FSL & 2015' FWL, Sec. 31, TllN, RllW, SM ~topofproductiveinterval 1250' FWL & 2150' FSL Sec. 30, TllN, RllW, SM At effective depth At total depth 10,000 ' TVD, 1250' FWL & 2150' FSL, Sec. 30, TllN, RllW, SM 8. Welt numb~q'0 . 6 9. Permit numb89-103 10. APInumber 50-- 883-10034 11. Field/Poo~id ~ena±/ Granite Pt. 12. Present well condition summary Total depth: measured true vertical 12,434' lO,364ee~ett Plugs (measured) from Cement plug 12434'-12270' Effective depth: measured true vertical 12,2?q~et 10,19'7f~et Junk (measured) Casing Length Structural Conductor 616 ' Surface 3963' Intermediate 7803 ' Production 10,645 ' Liner 12,400 ' Perforation depth: measured true vertical Tubing (size. grade, and measured depth) Packers and SSSV (type and measured depth) Size Cemented Measureddepth ~ueverticaldepth 20" 1040 SX 616' 616' 13-3/8" 3000 SX 3963' 3307' 9-5/8" 1000 SX 7803' 5971' 7-5/8" 700 SX 10,645' 8575' s× See attachment # 1 ©0T ~ ,~ ~1 .~,,. ~ ~ ~,~,~ 0if & Gat. O0r~s. Commis~;L~,~ 2-7/8", N-80 with Vann 3-3/8" gun~t~l~a~ 216' 2-7/8", N-80 at 10,204' 13. Attachments Description summary of proposal ~ Detailed operations program __ BOP sketch 14. Estimated date for commencing operatiop~ ~ OCTOBER 23, 19~u 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil ~ Gas__ Suspended x Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. GARY S. BUSH ~¢~',~/~,Title REGIONAL Signed FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- ¢~--¢j' ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Form 10-403 Rev 06/15/88 Approved Oopy Returned Jq/d:~ pO Commissioner IAppr°val N°¢~' '-' ¢ ~' 7 Date 1(~/~/¢70 SUBMI:r IN TRIPLICATE I · · ~ · · · · · · PROCEDURE Skid Rig and Rig up on Leg 1, Slot 7. Kill the well by circulating weighted brine. Install and test the 13-3/8" 5000 # BOPE. Recover dual completion including perf guns. Verify shots. RIH with wireline and set a cement retainer at 10,900' MD to isolate the lower zones. RIH and wireline perforate 10,772'-10,816' MD. RIH with drillpipe and fracture stimulate 10,772'-10,816' MD. RIH with a dual 2-7/8" hydraulic completion assembly. Begin production. Estimated 19 days· ~ F - .. Attachment #1 Perforated the folliwng intervals on 2/8/90 using 3-3/8" Hollow Carrier with Vann 32 Gram perforating charges, 4 SPF, 90o phasing, 0.56" diameter: Measured Depth True Vertical..Depth Top Bottom To.~ Bottom 10,770 11,058 11,429 11,460 11,501 11,578 11,612 11,696 11,738 11,778 11,827 11,852 12,089 12,152 10,812 11,082 11,454 11,469 11,525 11,592 11,673 11,726 11,750 11,796 11,844 11,916 12,145 12,217 8,700' 8,742 8,988' 9,012 9,358' 9,383 9,389' 9,398 9,430' 9,454 9,507' 9,521 9,540' 9,601 9,624' 9,654 9,666' 9,678 9,706' 9,724 9,755' 9,772' 9,780' 9,844' 10,017' 10,073' 10,080' 10,144' Total of perforated intervals is 461'; total perforations are 1,844. PLATFORM BRUCE DRILLING STACK PITCHER NIPPLE- 16' ID W/lO' FLOWLINE ANNULAR BOP "NL SHAFFER' 13 5/8' 5000 PSI BX-160 ASSY WT. 13,650 LBS. DBL GATE BOP 'NL SHAFFER' 13 5/8' 5000 PSI BX-160 ASSY WT. 16,500 LBS. MUD CROSS- 13 5/8' BORE WI4' 5000 PSI VALVES & CK SGL, GATE BOP 'NL SHAFFER' 13 5/8' 5000 PSI BX-160 ASSY WT. 9100 LBS. RISER 18°0D 13 5/8' 5000 FLG WIGREYLOCK CLAMP RING (AX) ,~- LOWER RISER 11" ID W/lO" 5000 PSI FLG (RX-54) 'ClW' P/N 41700-13 LEG BRUCE 1, SLOT 7 20" CSG O 816' 13 3/8", 68~ CSG O 3963' 9 5/8", 47 & 53.5# CSG SET AT 7803' 7 5/8" 39~ LONER FROM 7434' - 10,645' WELL # 6-7 SPUD 1 10/25/89 LONG STRING: 1. CIW DCBS TBG HANGER 42' 2. 3-1/2' BUTT x 2-7/8" BUTT XO 43' 3. 2-7/8" 6.4# NSO BUTT 'I'BG 43' 4. 2-7/8" BUTT x 2-7/8" 8RD XO 10,211' 5. KOBE 2-1/2" DBL "B" BHA ¢L238 10,212' 6. 2-7/8" 8RD x 2-7/8" BUTT ×0 10,231' 7. 2-7/8" NSO BUTT TBG 10,232' 8. VANN RA MARKER AT 10,640' 9. 2-7/8" NSO 6.4# BUll' TBG 10,641' 10. 2-3/8" 8RD x 2-7/8" BUTT 10,729' 11. 2-3/8" 8RD x 2-7/8" BUTT 10,730' 12. 2-7/8" VANN PORTED SUB 10,730' 13. 2-3/8" 8RD x 2-7/8" NSO 8RD 10,732' 14. TBG PUPS 2-3/8" NSO 8RD 10,732' 15. VANN PRESS ASS/MECH FIRE HEAD 10,756' 16. VANN 3-3/8" 4SPF TBG 90 DEG 10,767' BOTTOM OF THE GUNS AT 12,214' SHORT STRING: A. 3-1/2" BUTT x 2-7/8" BUTT XO B. 2-7/8" NSO BUTT TBG C. 2-3/8" BUTT × 2-7/8" BUTT D. 2-3/8" NSO 4.6# BUTT TBG E. 1-1/2" lORD x 2-3/8" BUTT XO F. TBG PUP 1-1/2" lORD NSO 42' 43' 7357' 7358' 10,192' 10,194' 10,204' MAX INCLINATION 57.2 BEG 5 1/2", 20~ LINER FROM 10,305'- 12400' i~/¢. ~ TD 12,434' C-2: C--5: C-7: C-8: 10,770' - 10,812' 11,058' - 11,082' 10,770' - 10,812' 11,827' - 12,217' GRB 8/23//90 LEG 1, BRUCE WELL ¢¢ SLO~- ~ PROPOSED 6-7 SPUD 10,/25//89 20" CSG @ 816' 13 3/8", 68# CSG @ 3963' 9 5/8", 47 & 53.5# CSO SET AT 7805' DUAL 2 7/8" STRING WITH A JET PUMP ASSEMBLY 7 5/8" 39# LINER FROM 7434' - 10,645' PACKER AND BHA AT +/- 10,600' MAX INCLINATION 57.2 DEG 5 1/2", 20# LINER FROM 10,305' - 12400' PBTD 12,270' TD 12,434' C-2: 10,770'- 10,816' CEMENT RETAINER @ 10,900' C-5: 11,058' - 11,082' 0-7: 10,770' - 10,812' C-8: 11,827' - 12,217' GRB 10/2/90 W. D. Ford Regional Production Manager Amoco Production Company Denver Region 1670 Broadway P.O. Box 800 Denver, Colorado 80201 303-830-4040 May 4, 1990 State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Attn: Robert P. Crandall File: JLH-113-WF Completion Reports Granite Point 18742 #37 Granite Point 18742 #28RD Granite Point 17587 #6 Attached please find an original and one copy of the form 10-407, Completion Report for the above referenced wells. Attached to the ComPletion Report is a copy of the daily w~ll summary of operations as required. If you have any questions or need further information, please contact Julie Victor at 303-830-4009. JAV/nmh Attachment JLHll3.jav disk 210 RECEIVED MAY 0 8 Alaska Oil & Gas Cons. Commission ,..,. g, nch0ra~ STATE OF ALASKA ,. ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~ GAS [] SUSPENDED ~ ABANDONED [] SERVICE [] ~ .~C'~i :::'/"~ ~i .... 2. Name 0fOpe'rator ,.- " ~' -~.;: 7. Permit Number Amoco Production Company ~ ~,.~.., , 89_103 ..... P.O. Box 800, Rm. 1833, Denver, CO 80201 ~,o~':~,_.~.J~: .... /: 50-883-10034 4. Location of well at surface Leg 1, Slot 7, Platform Bruce F~~ 9. Unit or Lease Name 2050' FSL x 2015' FWL, Sec. 31-11N~:11~I)A~'E, I GP 17587 At Top Producing Interval ~f 10. Well Number 1250 FWL x 2150' FSL Slr~JF~0 j~ #6 At Total Depth Sec. 30-11N~11W ~,_~ '~ ~L i~ 11 Field and Pool. 10,~ TVD, ~' F~FL x "F , Sec. 30-11N-11W Middle Kenai/ 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Gran ite Po int liE' KB-MSL 12. Date Spuddedl 0/25/89 13. Date T.D. Reached1/16/90 14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °ffsh°re I 16' N°' °f C°mpleti°ns2/9/90 62 feet MSL 1 17. Total Depth (MD+TVD)18.PIugBackDepth(MD+TVD),19. DirectionalSurveY12,434, & 10,3~' I2,270' & 10,I97 YESES] NO[] I20'DepthwheresSSVsetfeetMD I21.Thickness°fPermafr°st0 22. Type Electric or Other Logs Run Phas0r Inducti0n/SHC Sonic 10,600~-12,410'; DIL/FDC-CNL 3958'-10,643'; CBL/VDL 10,280' 12,1 ,, 23. CASING, LINER AND CEMENIlNG RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ..~'.0" 133# X-56 Surf. 616' 26" 1040 sx -- ...13-3/8I' 68# K-55 Surf. 3963' 17-1/2" 3000 sx -- 9-5/8" 47&53.5# S-95&L-8( Surf. 7803' 12-1/4" lO00 sx -- 7-5/8" 39# P-il0 7434' 10645' 12-1/4" 700 sx -- 5-1/2II 20# P-il0 10305' 12400' 6-1/2" 408 sx -- 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interv_al, size and number) See Attachment #1 SIZE DEPTH SET (MD) PACKER SET (MD) .... _2-7/8" 10,168' -- , , ..... 2-7/8&2-3/8' 10,148' -- 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL IMDI AMOUNT& KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production t Method of Operation (Flowing, gas lift, etc.) 2/9/90j Pumping - Hydraulic Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 2/25/90 12 TEST PERIOD I~ 0 2 87 .... Flow Tubing Casing Pressure CALCULATED OIL~BBL GAS-MCF WATER-BBC OIL GRAVITY-APl (~rr) Press. 50 70 24-HOUR RATE I~ 0 4 174 -- 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NoneRECEIVEP ,.~:,:SIaska Oil & Gas Cons. Commis~io~r~' ...... '-'~, ~nch0ra..~ -"- ,, 79' Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE __ GEOLOGIC MARKERS FORMATION TESTS NAME _ Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. , , Beluga 5,064' 3,993' No individual sand tests performed yet. Tyonek A 8,327' 6,415' Perforated C-2 through C-8 sands simultaneou.~ Tyonek B 8,926' 6,938' Planned to re-enter well to production test Tyonek C,1 10,540' 8,471' individual sands, but this work is postponed Tyonek C-2 10,756' 8,686' until the Drift River Oil Terminal is returne Tyonek C-5A 11,055' 8,985' to normal operation. Tyonek C-7 11,480' 9,409' Tyonek C-8 11,820' 9,748' 31. LIST OF ATTACHMENTS Attachment #1-List of Perforations, Attachment #2-Daily Summary -- 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~, ~_ /~.~/ Titl~J,¢_ ,1~-O~/~ ~_ //~?~-~(~/ · Date 5"',-~--q~Z)_ . _ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". y. Form t0-407 Attachment #1 Perforated the folliwng intervals'on 2/8/90 using 3-3/8" Hollow Carrier with Vann 32 Gram perforating charges, 4 SPF, 90o phasing, 0.56" diameter: Measured Depth True 'Vertical-.Depth Top Bottom Top Bottom 10,770 11,058 11,429 11,460 11,501 11,578 11,612 11,696 11,738 11,778 11,827 11,852 12,089 12,152 10,812 11,082 11,454 11,469 11 ,'525 11,592 11,673 11,726 11,750 11,796 11,844 11,916 12,145 12,217 8 ,'700 8,988 9,358 9,389 9,430 9,507 9,540 9,624 9,666 9,706 9,755 9,780 10,017 10,080 8,742 9,012 9,383 9,398 9,454 9,521 9,601 9,654 9,678 9,724 9,772 9,844 10,073 10,144 Total of perforated intervals is 461'; total perforations are 1,844. RECEIVED ivlA¥ o'8 19 ,0 ~hska.Oil & Gas Cons, CommissiOn 220.00 0.00 O400 :ti'} ~j~i*~.*~TE. - T.~I?) I~", ftGLF~ ,£Tr4 CLE_~N OUT LiHA FORe, AT ION PROGRESS 0.00 REPORT OATE; 0q/23/90 USER DEFINED REPORT PAGE SU SU SU SU SU SU SU AND TAG AT 220 RKB X NO RESTRICTIONS IN. 30'~ DRIVE PIPE X THE ALASKAN MUSKY HAS RETURNED WITH THE LAST LOAD OF LEAD CEMENT AND DRESSER WIRELINE UNIT AND IS PRESENTLY UNLOADING SAME ALONG WITH A LOAD OF DRILL WATER. DISPLACE HOLE TO UNFILTERED INLET WATER AND PREPARING TO DRILL OUT TO CHECK BOTTOM OF DRIVE PIPE. 12| -"~ REMARKS: TYPE RE~JlARK FI FI FI S~ su su TD P BTO PRESENT OPERATIONS FOR#AT I ON PROGRE SS ,...m ,.... ~.m. ,,,m. ,mmm. ,m,. ,,w~..me,. .mm,. ,,m. ,..~ .m *,.,,.. ,mm..,m..,,,. ,mm, ..~., ~,mm.*m,..... ,m,~ ~m,. em, ,.m,,m. ',ma ,mW.,.... ,.,.,,,mm ,,m,* .mm, .,mm. ,~m. wm, m *mm. e ~ ~ e ~ ~ g m ..m, ~,m., mm, ,mm, ,me ,mm, em. ,,mm ,,mm..m., ,mm ,,m, .mm, ,.mm..m,m~ ,,m. ,.,m~ ~mm~ 3'lg. O0 0.00 DIRECTIONAL DRILLING WI D--50 SURFACE RE MA RI(S FEDERAL INSPECTION - L W ITM MM FROM 2~I9 -- 409 AT 1-2 MIN/FT X LAST SURVEY WITH GYRO AT 3'65 2.5 DEGREES N37W INDICAIES THAT WE HAVE ESTABLISHED A TREND THAT WILL ALLOW US TO TOH FOR ROTARY ~HA IN 30--60 AND THEN FINISH DRILLING TO CASING POINT ~ITHOUT INTERFERENCE FROM OFFSET WELLS. 24 HR SUN~NARY - BASED ON THE GYRO THAI WERE 'RECEDED INSIDE AND ~TSIDE OF THE DRIVE PIPE" T'HE WELLBQRE WAS BEING ~FORCED~ APPROXIMATELY DUE EAS',T W'I'TH T~ JETTING BNA. THERE IS A POSSIBILITY THAT' WHEN DRIVEN THE 30~ WAS HANM'ERED PAST SOME BOULDERS IE, ~USHROOflED TOP WHICH RESULTED IN THE EASTERLY TENDE'NCIES,, DUE THE INABILITY' TO ~ET AFTER 13 THE DECISION W'AS MADE TO CHANGE TO THE MUDMOTOR BHA TO TURN T~E WE~LBORE B~CK UNDERNEATH THE ~0". THE ORIGINAL GOAL WAS TO HAVE ~--~ DEGREES INCLINATION IN A NSO~ O'~RECTION AT 20~ CA~ING POINT ~ICH COULD ONLY BE AC~O~LISHEO MOTOR I'NG. NOTE: OFFICIAL SPUD TIME AT 15]0 HOURS 10'/25/8g / 89/10/27 REMARKS: TYPE REMARK · ,m~ ,..,,, ..m, ~...,. ~m,.,,m, ~,m..,,,m..,,mm.m.., ~ TD PR 585.00 OPENING I HOLE T ¢, P BTD FORMA TI O'N P ROGRE SS 0 . O0 SURFACE 26b . O0 SU 0/+00 HR UPDATE - CONTINUE TO OPENHOLE FROM REPORT DATE USER DEFINED REPORT PAGE SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU 34]2 38? WITH I0-20K~ WOE1.' - AND 90RPM X MONITORING LISTENING DEVICES ON GP ~703 FOR INTERFERENCE X TAGGED UP ON GP ~703 20mm 'CASING AT ~87 X SOME CEMENT ACROSS SHAKERS X SH~ DOWNAND CIRCULATE HOLE CLEAN IN PREPARATION 'TO TOH FOR CEMENT PLUG 2& HR SUMMARY - [N ATTEMPT TO TURN THE WELBORE BACK FROM AN EASTERNLY DXRECTEON WE CROSSED OVER T~ TOP ~ GP aZ03 S 20" CASXNG AT APPROX]MATELY 387 X TOOL FACE ORIENTA[ION FROM 3]9 -~9 ~AS N50--70~ TO TURN THE ~L AROU~ FROM T~ N30E SURVEY' AT 260 X ~HE NEXT TJO SURVEY POINTS 300 ~ 365 SHO~ED THAT WE ~ERE PROGRESS[~ ON !LAMING THE H~E WITH AZ[RUTH READINGS OF NII~ ANDN37~ RES~CT[VELV. T~ NEXT S~r~Y POINT A[ ~10 THAT ~E L~ST R]GHT HAND TURN BACK'TO NIS~ AND HAD ~UILT 'ENOCH ANGLE TO CROSS OVER THE T~ OF GP e703 S ~ELL~OREe OE~PLAN C~C~AT[ONS SHO~ THAT ARE 0e3[ AWAY FROM GP ~03 AT T~ CLOSEST POINT AT 392 DRILLING CONTINUED IN AN EFFORT TO MAXIMIZE THE ~[S~ACEMENT FROM GP a703 BY CASING POINT . TD PBTO PRESENT OPERATIONS FORMATION PROGRESS 58'5,,00 llSOe()O OPEN HOLE TO 2'6" AT :332 FT SURFACE OeO0 REMARK:S: TYP~ ~EM ARK SU SU DI D! DI D! REMARKS 0400 HR UPDATE - WL')C :AND CONTINUE TO CLEAN UP CEMENT X CUT AND SLIP. 120 DRI:LLENG LINE D,[RECTIONAL SUMMARY - THE CURRENT PLAN IS TO DRESS OFF THE CEMENT PLUG TO 215 ANO KICK OFF WITH THE SAME MUD MOTOR/2 DEGREE BENT S~JB BHA IN AN WESTERMLY DIRECTI',ON. ONCE THE DIRECTION, IS ESTABLISHED WE WILL BEGIN TO BUILD ANGLE TO ~CHIEVE 3-6 DEGREE'S BY CASING POINT AT 600- THIS WILL MAXIMIZE OUR OISPLACEMENT FROM GP ~70~1. TD PBTO PRE SENT OPERATIONS FORMAT!ON PROGRESS 89/I0/29 2~A. O0 0.00 OPENING HOLE TO 26~ TO CHECK SURFACE 2%.00 12) ~::X~:: REMARKS: TYPE REt'-IARK DI REMARKS DIRECTIONAL SUMMARY - ORIENTED TOOL FACE TO' DRILL C DATE: 04/23/90 USER DEFINED REPORT PAGE ¢ C DI DI OI DE DI DE DI DI DI lBO DEGREES OPPOSITE OF THE PLUGGED BACK HOLE OR AT A DUE WESTLY DIRECTION X TIME DR ILL PLUG UNTIL WE STARTED TO SEE SOME COAL/FORMATION ACROSS SHAKERS X SURVEYS ~ERE SHOWING A STRONG LEFT HAND TURN THE OLD WELLBORE NSgE TO NIBW WITH A L IITLE INCLINATION INCREASE 0.2 FO 0.? X BEGAN TO SEE AN INCRESE IN CEMENT IN SAMPLES BELOW 2?0 X DECISION WAS MADE TO TRIP FOR HOLE OPENER TO CHECK ON CEMENT I NTEGR I TY 8'9/10/30 TD PBTD PRESENT OPERAT IONS FORMAT I ON PROGRESS SGOeO0 0.00 RUN GYRO SURVEY AT 545 SURFACE 316.00 REMARKS: TYPE REMARK TI TI DI D! D! Ol D! D! D! D! D! D! D! D! D! D! D! O! DI D! DI REMARKS DAYLIGHT SAVINGS - TURN CLOCKS BACK ONE I HOUR FOR DAYLIGHT SAVINGS TIME 0400 HR UPDATE - DIRECTIONAL DRILL FROM AND GYRO SURVEY X CIRCULATE THE HOLE CLEAN AND TOH X LAY OOWN MUD MOTOR AND PICKUP 2~" HOLE ODENER TIH DIRECIIONAL SUMMARY - A 2.5 DEGREE BENT SUB WAS PICKED ~ AFTER OPENING HOLE TO '28B TO INCREASE DEFLECTION AND HELP US GET OFF THE CEMENT PLUG X A TOOL FACE ~ ME SOUTH W'AS UTILIZED WHEN lINE DRILLING ~'E IO IME CONFIGURAIION OF THE ORIGINAL HOLE IE, NW A~ INCREASING ANGLE X AFTER INSURING WE WERE A~AY FROM THE OLD HOLE THE TOOL FACE WAS BROUGHT AROUND FOR HALF RIGHT TURN/HALF BUILD POSITION IHE ~E~tBORE WEST OF THE PLAIFORM AND ACHIEVE ~--~ DEGREES I<LINAIION ~8Y CASING POINT THE AVERAGE DOGLEG RECORDED IHRONGHOUI THIS INTERVAL ARE IN THE RANGE OF 2.5--3.1 DEGREES X PRESENT BOTTOMMOLE LOCATION IS 4.~1 FI SOUTH ~ ~EST OF SLOT ? X ~E ARE IB FROM GP20 17 FROM GP703 AND 21 FROM THE OLD HOLE OF GPT06. REPORT DATE' 04/23/90 USER DEFINED REPORT PAGE ~9/10/31 TD PELTO PRESENT OPERATIONS FORMAT ION 625.00 0.00 OPENING HOLE TO 26" AT 616 SURFACE PROGRESS 65.00 TYPE REMARK DI DI D! DI D! REMARKS 0400 HR UPDATE - OPEN HOLE FROM 616-625 X CIRCULATE HOLE CLEAN X SHORT 'TRIP INTO 30m' CASING X TRIP t~ACK TO BOTTOM AND CIRCULATE HOLE AGAIN X PUMP A 100 BF3LS HIGH VISCOSITY S~EEP X HOLE IN GOOD CONDITION XTOH FOR CASING 89/11/01 PRESENT OPERATIONS WELD ON 20~ CSG HEAD FORMAT [ ON SURFACE PROGRESS 0.00 TYPE REMARK SU SU SU REMARKS E -'cut ...... 0,400 R UPD TH , A AND PULL 20" X MAKE FINAL CUT ON 20~ AND INSTALL SLIP-ON C~SING HEAD AND WELD SAME TO 6)9/I 1/02 625,00 6)9/11/03 91 I . O0 PBTD 0.00 0.00 PRESENT OPERATIONS NIPPLE UP OIVERTER SYSTEM. P DI~ECTIONA:L DRTL'LING WITH MU FORMATION SURFACE S UR F A C E @ROGRES$ 0o00 2q5 :. O0 [2 J ........ R~MARKS o TYPE RE~I ARK SU D[ DI OI REMARKS 0400 HR UPDATE - DIRECTIONAL DRILL FROM git-lOB0. DIRECTIONAL SUMMARY - A TOOL FACE SETTING OF 30--40 DEGREES RIGHT OF HIGH SIDE WAS iNITIALLY USED TO START THE RIGHT HAND TURN AND MAINTAIN INCLINATION. AS THE WFLLB'ORE WAS BEGAN TO TURN RIGHT TOOL FACE R~PORT DATE= 0/+/23/90 USER DEFINED REPORT P AGE D! OI COAL, CONN. GAS : 0400 HOUR UPDATE: RANGING FROM 14-90 12-I27 UNITS, 8GG : 30 UNITS, DRILLING AHEAD AT 3345, ROP FPH. NO SHOWS TO REPORT. 121 ~-~- REMARKS= TYPE REM ARK LI L! LI TD PBTD 3693. O0 0.00 PRESENT OPERATIONS FORMAT ION PROGRESS DRILLING AT 3695 SURFACE 41OeO0 REMARKS L[THOLOGY -- SILTSTONE SANDSTONE AND COAL. 8GG=30-640 UNITS CONNECTION GAS = ti-300 UNITS~ flOUR UPDATE:DRILLING AHEAD AT 378~, 09/1t/09 REMARKS: TYPE REMARK LI LI LI LI LI LI SU SU 12 ) ;~.~:~'- REMARKS' tYPE REM ARK TD PBTD PRESENT OPERAT'IONS FORMATION PROGRESS 3967,00 0.00 REAM 3750 TO BOTTOM SURFACE 27..00 REM ARKS LITHOLOGY: SILTSTONE COAL AND SANDSTONE, TRIP GAS= 860 UN[TS ~GG AVG, = 140 UNITS CONN., GAS : 30-120 UNITS. NOTIFIED NIKE HINDER WITH ALASKA OIL 6 GAS COM~MISSION AT 1450 HOURS ON 11--B-89 OF UPCOMING, ,BOP TEST. 0~00 HR UPDATE - CIRCULATE 8'OTTOMS UP ~ PREPARE TO TRIP OUT TO RUN CASING, HAVING PROBLEMS ~ITH D~IESEL TO RIG ~NG[NES ANO C~ANE GELLING TO PB. TD PRE SENT OPERATIONS FORN~TION P'ROGRESS 3~6~.00 0,00 CIRC, ~ COHO, HOLE FOR CENEN SURFACE O,O0 REMARKS 24 HR SUMMARY: SHORT TRIP AND CIRC, ~ COND. HOLE RFPORT OATE' USER DEFINED REPORT PAGE DI Ol Ol Ol DI DI OI OI DI REMARKS: DISCUSSED RECENT WELL PROBLEMS WATER FLOW IN 20" BY 13 3/8t' ANNULUS AND ANNULUS PRESSURE WITH RUSS DOUGLAS ~ITH A06GC COMM 1:00 PM ~-~2-8g. HE AGREED WITH AMOCOS PLAN TO MONITOR ~ELL ANO NOT ATTEMPT ANY REMEDIAL ACTION. ANNULUS PRESSURE B(JILT UP TO 320 PSI BY l:O0 PM 11-12-89 AND HAS STABILIZED. PRESENTLY MONITORING THE ~ELL. PLAN TO BLOW DOWN ANNULUS IF PRESSURE BUILDS TO %00 PSI 12j ;~ ,,-$ ~ REMARKS: TYPE REMARK Ol DI TO PBTD PRESENT OPERATIONS FORMATION PROGRESS 3g77.00 0.00 TRIP OUT FOR BNA 10.00 REMARKS 0400 HR UPDATE - PICK UP BNA FOR DRILLING AHEAD. PRESSURE ON 20" X 13-3/8~ ANNULUS STABLE AT 300 PSi 89/11/~ 5 TO POTD PRE SENT OPERATIONS FORMATION PROGRESS 43.30.00 0.00 DR ILLING AT 4330 SNSLTSTCOAL 353-00 12 j -,-~--,- REMARKS: 'TYPE REM ARK L! L! LI gl REMARKS LITHOLOGY - SAND SILTSTONE AND COAL BG/CG/TG - ZOO BG/ I0-220 CG/ 6 TG AT 0400 HR UPDATE - DRILLING AHEAD AT 4%?0, NO SHOWS TO REPORT, PRESSURE ON 20" X ~3-3/8" ANNULUS=2?O PSI TD PBTD ~748.00 0.00 PRESENT OPERATIONS TRIPPING IN W/ PACKED FORMAT l ON SNSLTSTCOAL REMARKS: TYPE REgARK REMARKS LiTHOLOGY - SILTSTONECOAL AND SANDSTONE PROGRESS 418.00 REPORT DATE: 04/P'3JgO USER DEFINED REPORT PAGE 89/11/20 REMARKS: TYPE REMARK OI D! OI SU su SU TD P~TD 6052, O0 0o00 PRESENT OPERATIONS DRILLING AHEAD ~ITH PACKED FORMATION SAND-SHALE--COAL PROGRESS 552.00 REMARKS DIRECTIONAL SUMMARY - PROCEEDING WITH SLOW DROP INTO TARGET WITH LESS THAN 1.5 DEGREE/lO0 DOGLEG SEVERITIES. PRESENT BOOTOMHOLE LOCATION AT 6002 IS 2046 $ X 255 E OF DESIRED C2 TARGET POSITION AT 8650 TVD OR 2062 AT NI.IW. THE CURRENT E-W TARGET WINDOW IS N2.SW TO NI3.SW AZIMUTH HEADING. 0~00 HR UPDATE - SHORT T~,IP ~2 STANDS TO [~-3/8" CASING SHOE WITH ~O~OK~ DRAG U~ ANO O0~N~ SAW A COUPE IOOK~ ~O~ES AT 5~20 AND ~38 ON TOH AND ~EAN ON TIH. TAG COAL BRIDGE AT 58~2 X KELLY UP AND ~ASH/~EAN ~H~O~GH ~I~H NO PRO~LE~S~ 20" X 13-3/8w ANNULU~ PRESSURE ~TEA:D~ ~T 350 PSl. REMARKS: TYPE REMARK OI D! O! D! D! DI SU TO PBTD PRESENT O,PERAT!ONS FORMAT ION , PROGRESS &SIg. O0 0.00 D,Ri,LLING WITH PACKED BHA TO SAND-SHALE-COAL ¢6~.00 REMARKS DIRECTiONAL SU.~,MARY - THE' PRESENT DROP RATE OF l.O DEGREES/lO0 IS ACCEPTABLE UNTIL ?500 MAXIMUM ~HERE AT THAT Ti~E ADJUSTMENTS BHA MUST 8E MADE ,TO SLO~ IT TO O.15 DEGREES//O0 . T~ ~oTTONH.~E LOCATION AT T~ LAST SURVEY POINT OF 6559 THIS EQUATES TO 1658 S X 222 E OF THE C5 TARGET 8650 TVO OR 1672 ~ Nl.b~. THE E/W AZIMUTH WINOOW IS N2,1W TO 0400 HR UPDATE. - ORIEL FROM 6519 - 6618 · PREPARE TO SHORT TRIP 18 STANDS TO 5000 TO CHECK COALS FROM THE BELUGA TOP TO 8G/CG/TG - t2-270 16 AVE /0-9/360 FR~ SHORT TRIP LITHOLOGY - SANDSTONE-SILTSTONE-COAL REPORT bATE USER DEFENED REPORT PAGE 68 HOURS FOR 20.9 FI'/HR. AVERAGE, TO PBTD PRESENT OPERATIONS FORMAT ION PROGRESS ?225.00 0"'00 DRI:LLING W / BUILDING BHA SAND-SHALE-COAL 268.,00 REMARKS: TYPE REMARK REMARKS DI DIRECTI~AL SUmmARY - THE 9 PACKED BHA CONTINUED D[ TO DROP ANGLE AT t.O DEGREE/~O0 OR BETTER AND D[ ~AS P~L~ED TO AT 7~t~5 D~ T'~ FALLING BEH['N~ THE D[ ~OJECTED DiRECTiONAL PR~RAN. A 2B~3 ~ONEL DC D[ WAS ADDED TO THE ~HA TO CREATE A ~ BUiLDiNG DJ ASSEMBLY TO STOP/SLO~ DROP TREND"' BHA DATA FILES DJ SHO~ THAT S[~'ILIAR BHA S DROP BETWEEN 0.3'0.7 O[ DEGREES~tO0 IN THiS [NTERV'AL. THE BHL AT THE LAST D[ SURVEY OF 7108 ~ DEGREES N2.9~ WAS ~056 N X D] 567 ~ OF PLATFORM BR:~E LEAVXNG t338 FROM S~[O D[ TVD OR 22 DEGREES AVE~A~ ANGLE AT NB.SW AZ[MU'TH. DX THE E-W WXNDO~ T~ERANCE IS N2E TO NIS~ SU 0~00 HR U~PDATE - DR..ILL FROM 7225 -72~ ~[TH MWD SU SURVEYS. LAST SURVEY A~ 72~1 ~S~8 ~'GRE~S NSW HAS SU ~R:~KENED THE DROPPING TREND AND HAS ~EVEL~' A SU SLEGHT [~ -DEGREE~/~O0 BUILD WiTH SSK~ WOB AND 75 SU RPN. PRESENTLY RUNNING 30-35K~ WOB AND qO RPN SU WXTH THE SAME ROP WH.[LE MONITORING THE BUILD SU TREND"' ANT[CEPATE THE BUILD TO SLOW WiTH T~ GA BG/CG/T'G - 15-28 20 AVE /O/tS0 AT ZIPS ~D PSTD PRE SEN T OPER ~ [ONS FO, RNA ~ [ ON PRO.RE SS 89/It/25 Z468,00 0.00 TIH ~[TH 25 PACKED BHA SANO-SHALE-COAL 0.00 B9~[~26 ~812,00 0.00 DR~LL[NG ~IN~D SURVEYS ~ 30 SAND-SHALE-COAL 3~.00 TYPE REMARK REMARKS SU 0400 HR UPDATE - DRILL FRON T812 -77 ~TH VARYING SU WO~/RPN TO CONTROL DROP RATE. REPORT DATE: 0/+/23/90 USER DEFINED REPORT PAGE DI DI DI DI DI DI DI DI OI GA GA GA 61,9/' 1 !/2 ? DIRECTIONAL SUMMARY - WE ARE PRESENTLY ATTEMPTING TO CONTROL THE DROP RATE BETWEEN 0.5-1.0 DEGREES/IO0 TO PARALLEL THE PLANNED PROJECTION INTO THE 9-5/8" TARGET. OUR BHL FROM OUR LAST SURVEY OF 7687 33.3 DEGREES 356 IS 4508 N X 600 W OF SURFACE OR 888 LEFT E DISPLACE~NT AT 3~9.3 AZIMUTH. THE E-W TARGET TOLERANCE Wi~OW IS 360 lO 335 DEGREES AZINUIH AND THE AVERAGE ANGLE 12.5 DEGREES. WE ARE CURRENTLY MOLDING INCLINATION AT 33.3 DEGREES ]~ITM 55K~ WO8 AND 15' RPM. BG/CG/TG - IO-20~O/NA, COAL STRINGERS AT 7615 --,765,0 ??95 AND 78?0 . EXLO6 ESIiNAIED COAL ~ARKER ONT~ THE ~A~ SAND AT 8260 . TD PBTD PRESENT OPER AT IONS FORMAr I ON PROGRESS 8123.00 0,00 DRILLING W/ flWD SURVEYS SAND-SHALE-COAL 311.00 12) ¢---.--,-REMARKS. TYPE REMARK REMARKS (. ..... ............. SU 0~00, HR~ UPDATE -- DRILL FROM' 8t23 --8160 IN R ER SU MORE CONSOLIDATED ~AND:S ~'D SILTS. INCLINATION S~ S[ARTED TO DROP AT 1.5 DEGrEES/lO0 ~N LAST 60 ~ SU ~c%DED TO TOH FOR 30 PACKED BHA. DI DIRECTIONAL SUMMARY -- OUR PRESENT BHE AT THE LAST DI SURVEY OF 80~ ~2.~ DEGREES ~SS,.~ IS ~609 N DI 60g W OF SURFACE '~ITH 78/ LEFT OF DISPLCENENT AT DI 348.6 AZtM'uiH AND 17.8 DEGREES:AVERAGE ANGLE. THE DI PRESENT PLAN I,$ TO RUN A 30 PACKED BHA TO SLOW THE DI DROP RATE TO LESS THAN l.O DEGRE,E/IO0 TD PBTD PRE SENT OPERATIONS FORMATI ON PROGRESS ~ 89/11/28 8282.00 0.00 DRILLING WITH 35 PACKED BHA SAND-SHALE-COAL 159.00 12) ~ REMARKS: TYPE REMARK REMARKS C ¢ ( REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE OI OI DI DI OI GE GE DIRECIEONAL SUMMARY - ANGLE ON A SLOW DROP WITH 35 PACKED BHA AND 40K~ AND O0 RPMe VARYING WOB TO EITHER DROP OR BUILD INCLINATION, PRESENT BHL AT 8200 SURVEY ~PTH 46~5 N X 6t2 ~ ~[TH 12[ LEFT ~ DISPLACEMENT AT Nt2,2~e BG/CG/TG - t2-ZO/O/333 TYONEK "Aee SAND TOP AT 8325 ~D 64t7 TVD OR 217 LO~ TO FOR~ ~6 PROJECT ION ~ 'TYPE REMARK UP UP UP DI D! DI DI D! D! D! GE GE TD P~TD PRE SENT OPER AT i ONS FOR#AT ! ON PROGRE SS 8510.00 0,00 TiM AFTER SHORT' TRip SAND-SHALE-COAL 228.00 REMARKS 0~00 HOUR UPDATE - FINISH ~R[p IN HOLE X REA~ WITH NO FILL, WOR.K ON BRAKES TO ADJUST TENSION, DRILL FROM 85[0 -8532' DIRECTIONAL SUMMARY - THE BHL FRO.M THE SURVEY AT 8419 ~AS 495 S X, 1~5 E OF THE TARGET DEPTH OF 8650 T~ 5t6 AT Ni6.3W. THE E~W TOLERANCES ARE N2,3E 8Y N37~ WITH AN AVERA~ ANGLE Of 13,5 DEGREES, WE ARE PRESENTLY CONTROLLING THE DROP RATE W:[TH THE 30 PACKED ~HA AND THE FOLLOWING ~OB AND RPfl COMBINATIONS: INTERVAL 'WOB RPM SURVEY DROP/B'U ILD 8237-8290 :40 90 8231 .30,4 355,3 0,96/100 8262 30. I 355,7 0.96/t00 8294 29.6 366.? !.56/100 8290--8385 50 ~5 8326 30.2 3~6.0 1,88/100 8356 30.1 356.0 0.33/!00 83 88 30.2 356.0 O. :31 / 1 O0 83'85- 8~97 40 90 8~19 30*0 356.0 0.65/100 8~51 29.9 356.0 0.31/100 8~74 29.7 356.0 0.87/l 00' FJ~G/CG/TG -- 15-20/0/250 -- HAVE DRILLED SEVERAL COALS SINCE TOPPING THE ~'~A# SAND AT 8325 MD- REPORT OATE' 04/23/90 USER DEFINEO REPORT PAGE REMARKS' TYPE REMARK UP UP DI DI DI DI DI GE L! TD PBTD 8807. O0 O. O0 PRESENT OPERATtONS DR ILLI~ W/ 30 MWD SUR~YS FORMATION SAND-SHALE-COAL REMARKS 0400 HOUR UPDATE - DRILL FROI~ 880? -8859 t~ITH M'WD SURVEYS. DIRECTIONAL SUMMARY -- T~ B~ FROM [HE LAST TVD ~AT B~20 OR IS,a DEGREES AVERAGE ANGLE. ANTICIPATE MORE LEFT HAND WALK TO DEVELOP AS ANGLE DROPS AND THE C SANO STR~TURE BECOMES MORE DE F ] NEO. BG/CG/TG - LIT~LOGY - PROJECTED "B~e SAND TOP AT 89~0 MDc PROGRESS 297.00 89/1 2/01 12) ~ REMARKS: TYPE REMARK UP UP SU SU SU SU SU SU SU SU SU SU SU SU SU SU TD PBTD 8968.00 0.00 PRESENT OPERATIONS PICK UP NEW 8HA FORMATION SAND-SHALE-COAL REMARKS ;Z ....................... ~ [NISH MAKING UP N,E~ 8HA X TIN TO 'CASING SHOE X SL. IP AND CUT 400 OF DRILLING LINE 'X TIH~ 24 HOUR SUNNARY - CHANGE OUT TO NE~~ 8HA TO INCREASE DROP RATE INTO TARGET X PRESENT DROP AT 0.3--0.5 DEGREES/t00 AND REQUIRED DROP RATE 1.0--1.25 DEGREES/lO0. PRESENT ~HL IS ~08 AT N18.3~ TO THE C2 TARGET TVD OF 8~20 OR 1~.7 DEGREES AVERAGE ANGLE. THE E-~ WINDO~ TOLERANCE IS NSE TO N~3~ PLAN TO OROP ANGLE AT A RATE SET~EEN 1.0-1.5 DEGREES/lO0 UNTIL CASING POINT~ ANTICIPATING LEFT HAND ~ALK AS ANGLE DROPS ~ND ~E NEAR THE THE C SAND STRUCTURE~. NAGNETIC INTERFERENCE TO N~D FRON SHOCK SU~ ~AS ~.3 DEGREES TO THE RIGHT N~RTH AT CHECK SHOT AT ~tO AND 53 DEGREES INCLINATION. 2~ HOUR SUNNARY - ALL THE g--5/8a CASING IS ~N OECK PROGRESS 161 . 0 0 REPORT USER DEFINED REPORT PAGE 5U SU SU SU L% AND IS RACKED AND STRAPPED X TOTAL THREADS OFF FOOTAGE IS 10820 . WIREL[NE UNIT LOGS CASING PACKER AND JEWELRY ALL ON BOARD. 700 SX OF TARE CEMENT LOADED - WAITING ON 300 SX OF LEAD. L]:THOLOGY - TOP OF "B"' SAND AT 8925 tqD 6g~.2 TVD. 89/12/02 TD PDTD PRESENT OPERATIONS FORMAT I ON PROGRESS g187.00 0.00 DRILLING AT 9187 SAND-SHALE-COAL 219.00 REMARKS: TYPE REMARK SU SU SU SU SU DI Ol RE~tARKS 0~00 HOUR UPDATE -- DRILL F/ 9187 - 9225 W/ 30 SURGE Y~. BG/CG/TG -- 12'--62/10-2t/'105 a 8968 Lm[THOLOGY -- ['~ OF "TYONEK B~ SAND ~ GQ25 MD 69 38 TVD DIREETIDNAL SUMMARY - INCLINATION IS DRDPPI~ 1.38 DE~EES/IO0 AND DIRECTION HAS TURNED ~GREES/IO0 TO T~E RIGHT INSTEAD OF ANTICIPATED LEFT HAND WALK. 89/12/03 . -- -- 121 ~** REMARKS: TYPE REMARK UP UP DI TO P BTD~ PRE SENT OPERAT l ONS FORMAT l ON PROGRE SS g~Dg. O0 0.00 DRILLING AP~EAD ~ g~Sg SAND-SHALE--COAL 302.00 REMARKS 0~00 HOUR UPDATE- DRILLING ~ 9535 W/ 30 MWD SUR'VE YS. BG/CG/TG : 50/15/82 a 9300 DIRECTIONAL SUMMARY- INCLINATION [S DROPPING 1.16 DEGREES/lO0 AND OJ RECTION TURNED ALMOST ONE ~GREE TO THE RIGHT AT THE CURRENT HEAO'JNG OF 35~.~ OEGREES. THE WELLBORE IS ~50 FROM THE ~ THE TARGET AT THE CURR~NT HEADING. REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE 8,9/I2/04 966'0 - O0 0 · O0 PRESENT OPERATIONS DRILLING AHEAD AT 0060 FORMAT ! ON S I L TS TONE-COAL PROGRESS 171.00 TYPE REI4 ARK UP GE REMARKS OaO0 HOUR UPDATE - DRILLING AHEAD AT 9695 BG/CG/TG - 17/!8162 ~ 957? TD POTD PRESENT OPERATIONS FORMAT ION PROGRESS 979.5,00 0.00 TRIP IN WITH STEERING BHA SN SLST g COAL 135.00 REMARKS: TYPE REMARK L! GE D! D[ D! DI UP UP REMARKS L[ THOLOGY -- SAN~S/ONE SILTSTO~ AND COAL,,, BG/C,,G~CTG -- ig/~O/NOT UP YET. DIRECTIONAL SUSMARY -- WELL CONTINUED EADING TO NE. TRIP OUT FOR STEERING ASSEMBLY TO TURN THE WELL TO 345--'350 D'EGREES'AZJMtJTH AT THE CURRENT [~LINATION %6 DEGREES T'O GET INSIDE C--5 TARGET. O400 HOUR U~ATE '- DRILLING WITH MUD MOTOR AT 9796 WITH lO 000 LBS. ~OB. ~D PBT D PRE SEN T OPERA [ J ONS FOR~A T [ ON PROGRE S 89/12/06 9872..00 0.00 STEERING ~/'MN AT 9872 SELTSTONE ~ COAL 77.0'0' 12! ~, REMARKS: TYPE RE~ARK L! GE REMARKS LJTHOLOGY * SILTSTONE ANO COAL E~G/CG/TG -- 20/~7/76 UNITS AT 9'195 DIRECTIONAL SUMMARY - STEERING ~ELL ~ITH MUD MOTOR AND 1-3/~ DEGREE E~ENT SUB FOR MAXIMUM LEFT TURN REPORT DATE: 04/23/90 USER DEFENED REPORT PAGE D! D! D! UP UP UP UP UP UP BACK TOWARDS TARGET. ROP IS SLOW DUE TO DIFFICULTY GETTING ~IEIGHT TO THE F~IT FROM TOOLS OR DRILL PIPE HANGING UP ON THE LOW SIDE OF HOLE. Oa;O0 HOUR UPDATE - TRIP OUT OF HOLE WITH STEERING ASSEMBLY AFTER DRILLING O~Y 2 9872 - 9874 SINCE MIDNIGHT,. UNA[E TO MAINTAIN TOOL FACE AFTER ~]LLING THRO~H A COAL SECTION. PLAN TO REAM OUT MOTOR RUN DRILL AHEAD AND MON[TOR DIRECTIONAL h~ AD,[ NGe , 2:/07 REMARKS: TYPE REMARK L! GE D! DI DI D! DI UP 'UP UP UP TO PELTO PRESENT OPERATIONS FORMAT [ON PROGRESS 9931.00 0.00 DRILLING AT 9931 SILTSTON/ & COAL 59.00 REM ARKS - r ,o ^.o ..................... BG/CG/TG - 1~/18/82 UNITS AT 9875 DIRECTIONAL SU~:MARY -- ON~BLE TO KEEP T~E ~UD MOTO~ AND BENT SUB ORIENTED FROM g8~2 TO g8~5 DUE TO A COAL SECTI'ON AT g850 TO 9862 . AFTER 2-t/2 HOURS WITH LIMITED SUCCESS DECISION ~AS MADE TO TRIP OUT AND' LAY DOWN THE STEERING ASSEMBLY REAM ~T THE 80 OF MOTOR RUN AND TRY TO GET SOME F[LOW-THROUGH TURN ~ITH A CONVENTIONAL BHA. 0~00 HOUR UPDATE - DRILLING AT 9975 WITH 30 MWD SURVEYS. WELL IS STARTING TO WALK BACK TO TE EAST BASED ON THE LAST SURVEY: 9914 12-6 NI.gW TO 10089, O0 12) ~ REMARKS: TYPE REMARK L I GE OBTD PRESENT OPERATIONS FORMATION PROGRESS 0.00 'TRIP IN HOLE SILTSTONE & COAL 158.00 REMARKS LITHOLOGY - SILTSTONE AND COAL BG/CG/T,G - 22/21/I65 UNITS AT 10089 REPORT DATE: 06/23/90 USER DEFINED REPORT P AGE D I DI DI DI DI DI su sg SU DIRECTIONAL SUMMARY - ~ELLBORE CONTINUES TO WALK TO THE EAST WITH SLIGHT DROP IN ANGLE: 991~ 12.6 NI,gW 9945 12. I NI,2W 9976 ll.l 10008 11, I NO, IW t 00~ 0 1 ~00'6~ 10'5 NI,~E 0~00 HO~ U~ATE - DRI.LLING AHEAD AT 101~2 , SPENT 2 HOURS REAMI~ TIGHT HOLE ON BOTTOM F~OM 9822 TO 10080 AND TD PElTo PRE SENT OPER Al ,10NS FO, RMA T I ON PEOGRE SS 89/12/09 10300.00 0.00 DRILLING AT 10300 SILTSTONE I; COAL 211.00 C REMARKS: TYPE REMARK SU L! GE D! D! D! 0! D! D! D! D! D! UP REMARKS 26 HOIJR SUMMARY - DI~':ILY COST : ~'l? 922 CORRECTED FOR OVERCHARGE ON YESTERDAY S COST CUN~ATIVE CO ST : Li, THOLOGY- S[LTSTONE AND COAL. BG/CG/TG- 23/15/30 UNITS AT 10237 DIRECT[ONA, L SUMMARY - INCLINATION STILL DROPPING AT 0~58 DEGREES/lO0 AND HEADING STILL TURNING EAST AT O.S4 DEGREES/tOO AS SHO~N FROR ~HE 30 SURVEYS: :1009,~ % 0.. 3 ~. OE 10125 10219 9.0 N3.1E l 0251 8.8 N3. ~E 0400 HOUR U~ATE - DRIvELiNG AHEAD AT I0345 , TOP OF C-I SAND EST~i~ATED AT 10580 --10600 BY NUDLOGGER, 89/1,2/10 TD POTO PRESENT OPERATIONS FORMATION PROGRESS t0510.00 0.0'0 DRILLING AHEAD AT lO, lO SN SLTST K COAL 210.00 REM ,ARKS 24 HOUR T I VE REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE SU LI LI LI GE OI DI DI DE Dt DI D! OI D! COST : $2 026 055 LITHOLOGY - SILTSTONE COAL AND SANDSTONE. TOP OF C"! SAND AT 10543 ~475 TVD . PROJECTED CASING POINT AT 10650 BG/CG/TG - 25/15/~5 UNITS AT 10~12 DIRECTIONAL SUMMARY - INCLINATION coNTINUES TO DROP AT i DEGREE/lO0 AVERAGE AND HEADING IS H~DING STEADY AT 3-4 DEGREES AZIMUTH: 10315 8.3 N4.IE 10'3~7 6. I N4. IE 10~9 ?.8 N~. IE 104lO 7.8 N3.aE 10~42 7.6 10537 5.g N4. IE 04GO H,O~ U~.ATE - DRILLIN~ AHEAO AT ~058~ LOOKING FOR LOGGING g CASING POINT AT */- 10650, TD PSTD PRESENT OPERATIONS FORMATION PROGRESS 89/12/11 106~5.00 0.00 REAN TO BTM AFTER SHORT TRIP SN SLTST G COAL 135.00 TYPE ,REMARK SU SU . SU L! L( D! OI D! OI DI UP UP REMARKS 24 HOUR SUMMARY - DAILY COST = ~24 ?0~ CUMULATIVE COST = $20SO LITHOLOGY -- SANDSTONE COAL AND SILTSTONE. NO SHOWS IN C--I SAND. BGG = 20 CG = OIRECTIONAL SUMMR~Y -- INCLINATION STILL D~OPPlNG AT l.O DEGREE/tOO AND HEADING HAS TURNED BACK TO THE WEST A~T 5.24 EGREES/tO0 AS $~WN FRON T~ 30 SUAVE Y S ' 10537 5. g Na. IE 10567 5.6 N2.4E 10598 5.3 mO.gE 0400 HOUR UPDATE - PU~P SWEEP CIRCULATE AND CONDITION HOLE FOR TRIP OUT TO RUM LOGS. START REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE 89/1,211 2 12. l ¢--** REMARKS: TYPE REMARK SU SU SU LI L! UP T D P 0 T O 106~5. O0 0.00 PRESENT OPERATIONS LOGG!N6 ~I TH FOC-CNL FORMATION NO Nil PROGRESS 0o00 R E:N A R K S 2~ HO~ SUMMARY -- OA ILY COST = $2~ 904 CUNULATIVE COST = $2 074 853 LITHOLOGY -- NO NE~ HOLE 'DRILLED. 125 ~NITS TRIP GAS A'T 106~5 . 0400 HO~ UPDATE -- LOGGING ~[TH FDC-C~. · TO PBTD PRESENT OPERATIONS FORMAT' ION PROGRESS 89/12/13 106~5.00 0.00 CIRC AND COND FOR 9 5/8'# CSG NO NEW 0.00 ~,~ t2 J ~.t.~ R~MARKS' TYPE RE~4ARK REMARKS SU 2~ HOUR SUMMARY -- DAILY COST : ~6l B:ll SU CUMULATIVE COST = $2 137 [6~ SPREADSHEET - DINS SU COSTS SHOED NOW AGREE SD SD e- GE BG/CG/TG - 80/--/8'5 UNITS AT 10645 UP 0400 HOUR ~POATE- TRIP OUT TO RUN 9--5/8'~ CASING. 'TO PSTD PRESENT OPERAT:IONS FORMAT ION PROGRESS ~/~2/1~, ~0~5..'00 0.00 ~[R~. X ~O~K STUCK CASING NO NEW 12) *** REMARKS: ~. TYPE REMARK REMARKS UP 0400 HOUR UPDATE - CIRCULATE ANO WORK STUCK g-5/8" UP CASIN6 ~T 7810 . PULL UP TO 500M LBS. M~X[MUM ~NO REPORT DATE: 04/23/00 USER DEFINED REPORT PAGE UP UP UP SLACK OFF TO 60M LBS. MINIMUM WITH NO ~OVEMENT DOWNHOLE. NO CUTTINGS OVER SHAKER WHILE CI RCULAT lNG. TO PBTO PRESENT OPERATIONS ,.,- ,,,=, ,,,m, .,... ~=., ~. ,.,~ ,,~,. -,,, .~ ,,,.. ~.=, .,,.,, .,,,, .,,,,, ,,.,. ,,m, ..a e~, ,,m -...m, e.~ =m, 10645.00 0.00 NIPPLE UP BOP STACK FORMATION PROGRESS 0.00 t2! ~'~ REMARKS: TYPE REMARK UP UP 89/12116 89/12/17 REMARKS 0400 HOUR UPDATE - INSTALL WING VALVES ON 'I0"-5000 PSI SPOOL AND NIPPLE UP BOP STACK. TD PBTD PRESENT OPERATIONS 106%5.00 0.00 CLEAN OUT CHT IN ,SHOE .JOINTS 106~5.00 0o00 REAM BRIDGE ~ tO LB0 FORMATION P R OGRE 0.00 0.00 REMARKS 0~00 HOUR UPDATE - 2~:00-00:30 REAM F/10~95 -106~5 10 OF FILL. 00:30-04:00 CIRCULATE & CONDITION HOLE, 89/'12/18 TO PBTD PRE SENT GPERAT I OHS 'FORMA T I ON PROGRESS 106~'5.00 0.00 CIRC SLOW B SHOE '?803 0.00 12j-**-,,-,- REMARKS: TYPE REMARK REMARKS UP 0400 HOUR UPDATE- .CIRCULATE SLOW ~ g-5/8" SHOE, UP WILL BE D4AKING ~NCE A DAY TRIP TO BOTTOM ~TO TURN UP TrlE HOLE OVER UNTIL FURTHER NOTICE, "BAKER" FLOAT REPORT DATE: 04/2.:3/90 USER DEFINED REPORT PAGE TD P§TD 10645.00 0.00 PRESENT OPERATIONS SHORT TRIP BACK TO SHOE FORMATION PROGRESS 0o00 REMARKS' TYPE REMARK FI FI FI FI FI FI FI FI FI FI FI FI FI FI FI FI FI FI FI F[ FI FI FI FI FI FI FI FI Fl FI Fi Fi FI REMARKS F[DERAL !flSPEC'T!ON - CK RANDOLPH WORKED ON THE DERRICK SAFETY MATERIAL INSTALATION TOE BOARDS HAND RA~:LS AND WALKAROUND ENTERENCE GATES . HE HAS A C~PLE H~$ WORK LEFT- IN THE AM AND WILL 8E FINISHED. HIS OEiNG ~ IN THE CROWN AREA ~ORKJNG OEL,AIffE'D OUR MAKING' THE SHORT'TRIP 8¥ A COUPLE HOURS. 0000000000000 O0 00000 000000000000000000000000000 00000000000000000 SLT STRING CASING STATUS: WILL 8E IN ANCHORAGE ON DEC.24 INSPECTED AT APl ON THE 26 AND CO~D t~E ON THE PLATFORM ON THE 27~ TIW FLOAT EQUIP. FOR THIS PIPE WITH T~ SLT CONNECT'ION HAS BEEN LOCATED IN HOUSTON. LAND ~ MARINE HAS THE ABILITY TO CUT A 5/8m LT&C 8RD PIm~, A PIIO COLLAR HAS BEEN LOCATED IN HOUSTON NOT A VERY POPULAR ITEM · THIS WILL ENABLE US USE THE' BAKER OIL TOOL HANGER WITH ITS 8RD PIN CONNECT I ON. FL~S ST.RING STATUS: THREAD G~AGE HAS A~RI~ED.. PA~T OF THE PRINTS ~ERE ~ISS.I~NG. THEY ~ILE BE FAXED ~0 LAND fi ~ARINE i~N THE AM. ~E HA~E FOUND A PROPEEM ~I~M MAKING CUT OFF ON THiS THREAD. IT HAS A. ~/16 UPSET ON ~HE lO AROUNO THE SEAL A~EA ~0 PRO,ECl ~HE SEAL FROM COLLAPSE. LAND & ~RINE gILL ~E CHE~CKING IN TO ~HIS PROOEE~ IN THE A~ ~UT I~ OOESN T L~K GO~D. THE FLOAT EUIPMENT FOR THIS PIPE IS SUPOSED'TO ARRIVE iN KENAI FRIDA~ ~ON. HANGER ASSE~3EY STAT~$: IS AT ~HE BAKER OIL ~0~ SHOP iN KENAI. i~ ~LL ASSEMBLE AN ~ESTEO THIS ~FTERNOON. O0000000QO000000000000000000000000000000000000000000000000000000 HALLIBURTON HAS ALL THE SQUEEZE PACKERS RETAINERS AND ~HE PR DISC VAL~E FOR ~ORKING THE 9 ~/~ OR 7 5/~ CASINGS. F.t REPORT DATE: 04/23/90 USER DEFINED REPORT P AGE C, 89/12/22 TD P BT D 10645. O0 0.00 PRESENT OPERATIONS CIRC SLOW AT SHOE FORMAT [ON ..., ,,,m,,. ,,.,,. ,,m. ~w,, m .i, ,~.....,.. ,.,...,m.,.m, ,,m, ~m .m,.,,,i..m. ,,.m, P ROGRE SS O.00 12) ~ REMARKS: TYPE REMARK SU SU SU SU SU SU SU $~ SU SU SU SU SU SU REMARKS 24 HOUR SUMMARY -- LAND & MAR!NE AEO'N~ tI~!TH THE A~LAS BRADFORD REP. ROB PRU[~ S~A~ED ~U~ OFF ~ORK ON ~HE FL~S PIPE AT A~ 8:00 AH YES~ER'DAY- T~Y HAD TO CUT PAST T~ RAISED ID AREA I HE'NTIONEO YESTERDAY $ REPORT TO START THEIR CUTe 'THEY MADE A CO~E AT'T'E~PTS AT RETHREADZ'NG BUT WERE UNABLE TO ~O NEET THE MINIMUM ~gS,0 SE,~ AREA REqUIREmENT ON THE FACE OF THE PIN ~H'EN ~EACH~NG ~HE MAXI~N THREAD L~N~TH~ ROB PRUITT CALLED ~E AT 1:00 PN~ HE HAD BEEN CO'NVERSIN~ ~ITH HKS ENG[NEERS~ T~E~ FELT ~AY BE POSSIBLE TO C~T THE THREAD BU~ NO~O BE TO COSTLY AND TI~E CONSUmiNG ~O DO THE ENTIRE OUR ST/L S~RIN~ ~GHT ~E ~ERE ':B~ THE TI~E THEY FI N ~ S~EO. 00000~O000000000000000000000000000000000000000000000000000000000 A STfL ~HR~ADED TI~ FLOAT 5~E AND A LT~C BAD X ST/L ~O HAS' BEEN LOACTED IN HOUSTON W~ICH ENA~L~ US TO RUN THE ENTIRE ST'RING ST/L. DUE TO THE VOLCANO 'ASH PRO'EMS NE ~AD ANOTHER ERUPTION ~ESTE,RDAY THE AIRLINES ARE NOT SHIPPING FRIGHT IN TIMELY MANNER. NE FELT A BACK UP LINNER MAY BE NEEDED. W'E HAVE DESIGNED ,ONE THAT IS AV~LABLE KENAI. ~T IS LISTED IN ~HE ~'5/8 INCH LINNER PROCEDURE UNDE~ ATTACHMENT 89/12/23 REMARKS: TYPE REMARK SU TO POTD PRESENT OPERATIONS FORMATION PROGRESS 10645.00 0.00 CIRC SLD~ AT SHOE 0,.00 REMARKS ORDERED 150 C REPORT DATE: USER DEFINED REPORT PAGE FI FI FI FI FI FI FI FI FI FI F! Fl FI FI F ! FI Fl FI FI 24 HOUR SUMMARY- SHORT TRIPS TO BOTTOM CONTINUE TO LOOK THE SAME WITH LITTLE TO NO FILL AND 200K~ DRAG ON THE FIRST 3-5 STANDS OFF BOTTOM ON THE TOH. THE DRAG OVER THE REMAINING OPEN HOLE RUNS BETWEEN LINER UPDATE -- THE BAKER LINER HANGER IS MADE UP AND TESTED IN KENAI ANO READY TO TRANSPORT TO RIG. THE BAKER ST/L LANDING COLLAR IS ON ORDER OUT OF LAFAYETTE AND IS DUE IN 12/23 OR t2,Y2%. T~ LINER PACK--OFF IS ORDEREO AND IS ~'E 'IN ALASKA 8Y.M:IO NEXT WEEK. ALL Fb%S FLOATS' AND X-O S ARE IN KENA[~ THE TIW ST/L FLOAT 'SHOE . LANOi~ COLLAR ANO X-O TO LT&C IN ~eA. AND WA[TIN~ AER C~R~O TR~NSP~T lO ALASKA - S~LD BE IN BY i2/26 A~ THE LATEST. WE HA~ ORDERED X-O JOINTS AND C~LARS CUT FOR LT~C TO FL~%S~ ~NO S'T~'COMB~iNAT%ONS IN THE EVENT THAT ALL THE '~OERED EQUIPmeNT ~DOES NOT ~RRiVE IN TIME. THE FIRST BOAST'' LOAD ONE TRUCK IS DUE IN ALASKA BY 12/24 P.:~.~ AND THE SECOND BOAT LOAD TVO T~CKS t2/26 A.M, - ALL EQUIPMENT IS' ~E ON BOARD THE BRUCE BY '12/27 - i2/28. BACK AND LOOK GGOD FOR THE NEAT ~G" SLURRY - HAVE TD P BTU PRE SEN T O'PER AT t' OHS FORMAT ! ON P R OGRE S ~ ~ m ~ ~ 10645.00 0.00 CIRCUlaTE SLO~ AT SHOE 0,00 ~, TYP:E REIMARK REMARKS UP 0400 HOUR UPDATE - CIRCULATE SLOW AT SHOE AND UP LINER EQUIPMENT TO P§TD PRESENT OPERATIONS FORMATION PROGRESS 89/12,/25 10645,00 0.00 CIRC SLOW AT SHOE 0.00 REMARKS' TYPE REMARK REMARKS REPORT DATE: 0~/23/90 USER DEFINED REPORT PAGE UP UP UP UP uP LINER AND LINER E(~UtPMENT 00000000000000000000 000 000000000 00000000000000000 0000000000000 O0 MERRY CMRIST~4AS " 89/~2/26 TO POTD PRESENT OPERATIONS ~FOR#ATION PROGRESS 10645~00 0.00 CIRC SLOW AT SHOE 0.0~0 I2 ! ~"~, REMARKS: TYPE REMARK UP UP UP REMARKS OQ, O0 HOUR UPDATE - C I,ECULATE SLOW AT SHOE X LINER AND LINER EQUIP~4ENT, REFER. TO REMARKS 12/23/89 FOR LINER AND EQUIPMENT STATUS. TO P8TD PRESENT OPERAT IONS FORMAT ! ON PROGRESS Bg/12/27 ~0645.00 0.00 CIRC SLOW ~ SMOK 0.00 12'! ~: REMARKS= TYPE REMARK. REMARKS SU LINER ~SU~tt4ARY - ALL THREE :TRUCK LOADS OF '?'--5/8" 39# SU PttO ~/ ST'IL CONNECTIONS HAVE ARRIVED IN KENA[ AND SU A~E BEING, INSPECTED, mT[Wm ~.LOAT SHO'E ~ CROSS OVER S.U ARE DUE TO 'ARRIVE'IN ANCHORAG~E 0700 t2/27/Sg. SU CROSS OVER JOINTS FOR ',~FL~S~ EONTINGENCY LINER ARE . SU ~EING CUT AT "L~:~" IN KENAI AND WILL BE ON WED. SU MORNING ~30AT LOAD OUT. 89/t2/28 TD PBTO PRESENT OPERAT!ONS FORMATION PROGRESS 10645.00 0.00 TOH FOR 7-5/8~ LINER 0.00 12) ~:~ REMARKS: TYPE REMARK REM ARKS OOO0 HOUR UPDATE- LAY DOWN 19,5~/FT DRILL PIPE. ¢ REPORT DATE= 04/23/90 USER DEFINED REPORT UP WAIT ON PROPER "BAKER" LANDING COLLAR. ICING UP CONDITIONS PROHIBIT A CHARTER CHOPPER TO TRANSPORT UP COLL AR. PAGE 89/t2/29 REMARKS: I"¥PE REM ARK UP UP TD PBTD PRESENT OPERATIONS FORMATION PROGRESS 10645.00 0.00 R/U TO CIRC THRU LINER 0.00 REM ARKS , 0400 HOUR 'UPDATE -BATCH MIXED lO0 'EELS E I5.8 PpG CEM.ENT SLURRYe PREPARING TO CEMENT LINERe 89/:12/30 TD PBTD PRESENT OPER AT !ONS FORMAT I ON PROGRESS 106~5.00 0.00 SPOT CEMENT PLUG ABOVE LINER 0.00 REMARKS: TYPE REMARK UP UP UP UP UP REMARKS Oe~O0 ttOUR UPDATE -~:PULLEO; 6 STANDS SET RTTS & PERFOR~IEO A HESITA~'ION SQUEEZE IN 3 ,STAGES. FINAL SQEEZE PRESSURE= %000 PSI. SHUT IN DRILL PIPE TO CAPTURE P~ESS~E 6 RIGGED DOW'N DS FREEZING CONO% TIONS . 89/12131 TO PBTD PRESENT OPERAT [ ON'S FORMAT I ON PROGRESS 106~5.00 0.00 PREPARE TO TOH FOR RTTS 0.00 REMARKS: TYPE REMARK UP RE M A R K S 0%00 HOUR UPDATE - TOH PICK UP RTTS TIH ~ PICK UP "HOWCO" PRESSURE RESPONSE DISK VALVE. REPORT DATE: 04./2.:1/90 USER DEFINED REPORT PAGE 90,/0110 l TO PBTD PRESENT OPERATIONS FORMATION PROGRESS 10645.00 0.00 PICK UP 3-1/2# DRILL PIPE 0.00 REMARKS: TYP~ REMARK REMARKS UP 0~00 HOUR UPDATE - PICK UP 3-i/2# DRILL PIPE. · TD PB~TD PRESENT OPERATIONS FORMATION PROGRESS 90/01/02 106~5.00 0.00 FORMATION INTEGRITY TEST 0.00 II I.I IIII It II TYPE REMARK REMARKS Oq. O0 HObI'R UPDATE - TO'H 50 STANDS SLM . TIH ~/' 28 STAh,N~$ OF EXCESS DRILL PIE IN DERRICK SLM & LAY DO W'N SA ME. III I I ,I III' I I II, I II IiIIl I , II i"I III,IIIIIIIIIIIIIIIIIIIIIIIIII I IIIII III III III~ 90/0 [/0 3 TO P§TD: PRE SENT OPERA T IONS FO'RMA T ! ON PROGRE SS ,.,,~.~..,,.i,..~..,,~...,.,.~ i ,~,, ·,,,,~ ~ III i ~ I 10690.00 0.00 SHUT DNDUE TO VOLCANIC ASH ~6.00 Il II II IlllII TYPE REMARK SU SU SU SU SU SU SU SU SU SU REMARKS Il IIII II.I I I I,I .I'l I IIl I II III I~III I ii IIIl I IIi IIII Ii'III I I I II~III,IIII II 2~ HOU~ SUMMARY -- DAILY CU:M:$2 960 llO 0000,00000000000~)000000000000000000000000000000000000000000000000 FOUND ERROR 'IN LOTUS 123 COLUM ~B# TALLY,. THE '?-5/8 LINER IS'IN :FACT ON BOTTOM 00000000000000000000 0000 00000000000~00000000000000000000000 000000 STARTED UP DRILLING OPERATION AT 1:30 AM X DRILLED I0665 lO 10709 X SHUT DO~N AG,AINDU~! TO ASH FALL OUT AT 4:00 AM 000000000000000 00000 0000 0000000000000000000'000000000000000000000 C, R~PORT DATE: 04/23/00 USER DEFINED REPORT PAGE SU SU SU EXLOG LITHOLOGY: $[LTSTONE SANDAND COAL. BG/CG/TG: 2/45/5, AT 10692 90/01/04 TYPE REMARK SU SU SU SU SU SU SU LI L! LI LI GE GE UP TD PBTD PRESENT OPERATIONS FORMATION PROGRESS ,mm.,mm. ,,m~ .m..mm ,.e. 10834e00 0.00 TON TO CHANGE BIT C-2 14~.00 ~ ' ~REMARKS 24 :HOUR S'UMNARY. !-- D, AiLY COST=~'25 '9'54 CUM=~2 986 064 CORRECTED DAY NO. ?0 OAILY COST :FROM $16 270 TO $16 236 , 5U BU SD SU LIT~LOGY -- SANDSTONE S[LTSTONE AND COAL TOP C-2 COAL = 10128 C-2 SA~ FROM 10760 TO ~0800 UNCONSOLIDATED SAND FINE GRAIN ANGULAR - FREE OIL ON SHAKER. BG,/CG/TG- 85/45/ CONNECTI'ON GAS AT 10797 = 2800 UNITS. 0~00 HOUR UPDATE - TRIP IN HOLE WITH NEW REMARKS: TYPE REMARK so SD L! LI L[ LI LI / TO PBTD PRE SENT OPERATIONS FORMAT IO'N PROGRESS 11075-00 0.00 DRILLI~NG AT 11075 C~5 24i.00 REMARKS 2~ HOUR SUMMARY - DAILY COST $18 281 CUM COST $3 004 345. LITHOLOGY - SANDSTONE SILTSTONE AND COAL. FORMATION TOPS PICKED BY MU~OGGER: C-3 = lO 900 C-4 : 10 920 C-5 : tO 960 BG/CG/TG - 60/10/60 UNITS AT 11012 · NO SHOWS TO R~PORT DATE: 04/23/90 USER DEFINED REPORT PAGE GE UP UP REPORT LAST 24 HOURS. 0400 HOUR UPDATE - DRILLING AHEAD AT 11092 ROP DOWN TO 3 FPH, PREPARE TO TRIP FOR NEW BIT , 90201206 REMARKS: TYPE REMARK SU SU SU SU SU SU SU SU SU SU SU LI L! GE TD PBTD PRESENT OPERATIONS FORMAT ION PROGRESS 11128.00 0.00 DRILLING AHEAD AT 11128 C--5 33.00 REMARKS 24 HOUR SUMMARY - DAILY COST,, $30 04,4 CUM $3 03~ 389 00000000-0 O0 O0 O000000 O000000000DO 000000000000000000000000000000 O0 THE DULLED HYCALOG PDC BIT HRO H~ILED OUT ONE INCH ,OF THE OUTER ROW OF CUTTER SURFACE, THE REMAINING INNER CUTTER AREA CO~PACTS WERE FLATTENED AND WASHED SOMEWHAT, THE OUTER CUTTER ROW AREA HAD BEEN GROUND OFF 2" UP THE SIDE DF THE BIT, E ARE CHECKING WITH REED INTO A L'I'ITLE HA.RER PI BIT TO RUN, IT IS INCONCLUSIVE WETHER THE C-5 SAND KNOCKED EF THE OUTER ROW OF CUTTERS THAT GROUP ~r GA~ AND ~IT FACE "OR WHETHER THEY HAD JUST WORN OFF DURING THE COURSE oF THE BIT' O00OO000000OO0000OO000000000000000000000000000000000000000000000 LITHOLOGY -- SANDSTONE SILTSTONE AND ~:A~UNOANT~' COAL CAVINGS' NO SHOWS TO REPORT ~AS'T ~G~CG~TG -- ~0~0~300 UNITS AT t O~O0 HOUR UPDATE - DRILLING AHEAD AT 11152 AT 6 FPH AVERAGE, 9 O/01/0 ? REMARKS: T'~"P E REMARK ~U SU SU SU TD PBTD PR.ESENT OPERAT IONS FORMAT I ON PROGRE SS 11251.00 0.00 DRILLING AHEAD AT 11 251 C-6 123-00 REMARKS 24 HOUR SUMMARY - DALLY COST $24 017 CUM COST $3 05') 306. 0000000000000000'00000000 00000000 00000000000000000 000000000000000 BARATROL PILL SEEMS TO BE HOLDING BACK THE COAL REPORT DATE: USER DEFINED REPORT PAGE SU SU SU SU L! GE GE UP UP PROBLEMS WE HAD YESTERDAY. WE WILL PUMP ANOTHER PILL OVER THE ENTIRE OPEN HOLE SECTION AND LET SET DURING OUR NEXT Flit TRIP, OOOO000OO00000000000 0000 00000000 O000 OOO000000000000000OO00 O0 O0 O0 LITHOLOGY - SANDSTONE SILTSTONE AND COAL~ BG/CG/TG - 50/10/291 UNITS AT 11237 NO SHOWS TO REPORT LAST 24 HOURS. 0400 .HOUR UPDATE -- DRILLING AHEAD AT 11 2?4 AT AN AVERAGE ROP OF b FPH. 90/0'1/08 TO PELTO PRESENT OPERAT !ONS FORMAT I ON PRO6RESS 1129.6.00 0,00 DRILLING AHEAD AT Il 296 C-6 45.00 TYPE REMARK SU SU L! GE GE UP UP REMARKS 24 ~OUR SUMMARY - DAILY COST $25 8?0 CUM. COST $3 085 176 LITHOLOGY - SANDSTONE SILTSTONE AND COIL TO REPORT LA~T 0~00 HOUR UPDATE - DRILLING AHEAD AT Il 316 AVG, ROP 5 FT/HR ~..i.,,,..'. 90 / 01 /0 '9 12) g:~:O REMARKS: TYPE REMARK TO PBTD PRESENT OPERAT IONS, FORMAT ION PROGRESS 11371.00 0.00 DRILLING AHEAD AT I I 371 C-6 75.00 LITHOLOGY - SANDSTONE S[LTSTONE ANO cOAL, E)G/CG/TG - 33/10/830 'UNITS AT 11354 NO SHOWS TO REPORT LAST 24 HOURS. OqO0 HOUR UPDATE - DRILLING AHEAD AT I1397 ROP AVERAGED '7" FPH SINCE MIDNIGHT REPORT DATE: USER. DEFINED REPORT PAGE 90/01/10 12} ~-~ REMARKS: Ll GE GE UP UP TD PBTD PRESENT OPERATIONS FORMATION 11483.00 0o00 TRIP OUT FOR NEal BIT PROGRESS 112.00 REMARKS L[THOLOGY -- SANDSTO~ AND $ILTSTONE. BG/CG/TG - 35/20/--- NO SHOIS TO REPORT LAST ~URS. 0~00 HOUR ~PDRT~ - TRIP OUT FOR ~'W ~[~. W~LL 90/01/1! 12} '~ REMARKS: TYPE REMARK L[ L! L! L! E1 TD P'BTD PRESENT OPERA T IONS F,ORMA T I ON PROGRE SS ll~l. gO.O0 0.00 DRILLING AHEAO ~ Il{gO C--6 1.00 Ll THO~O'GY -- S.ANOS!TONE BG/CG~TG- ~5/30--70/1800 a 11~83 NO SHOES TO REPOR~T IN LAST 2~ MRS. O~0O HOUR UPDATE - DRILLING AHEAD~ t1583 ~HYCALOG~ 90/01/12 REMARKS: TYPE REMARK UP UP LI LI TD PBTD PRESENT OPERATIONS FORMATION PROGRESS 11717.00 0.00 T[H W/' AT J-22 BIT C-7 22'?,00 REMARKS 0400 HOUR UPDATE - TRIPPED TO BOTTOM - OK. NO FILL. DRILLING AHEAD LITk~0LOGY- SANDSTONE g SILTSTONE, BG/CG/TG - t50/~0/2375 ia 11717 NO SHOWS 'TO REPORT REPORT DATE: 0~/23/90 USER DEFINED REPORT PAGE L! IN LAST 24 HOURS. ~ TO PBTD PRE SENT OPER AT IONS FORMAT ! ON PROGRE SS 90/01/13 tig~3.O0 0.00 DRILLING - PREPARE TO STRIP C-7 226.00 I2 ) '"'*'-.-.~.:~ REMARKS: TYPE RENARK UP UP UP LI L ! REMARKS 0~.00 fl~R UPDATE SHORT TRIP TO THE SHOE ~ I06~5 "TIGHT. SPOTS: B t! ~5 C t0 900 , DID'NOT SEE TIGHT SPOTS" GOING' BACK~ ~TO BOTTOM. DRtLLi'NG. AHEAD.' a L~THOLO~ - S~NDSTONE - S~LTSTONE - BG/CG/TG t0/30~90/225 ~ 1 1 90t0 i/14 TO PBTD PRE SEN T OPERA T ! ONS FOR!MA T l ON P.ROGRE SS 12 016.00 0,00 DRILLING AHEAD C-7 73,00 REMARKS: TYPE REMARK UP LI L[ REMARKS 0/~00 HOU~ UPOATE - DRILLING AHEAD ~ .081 LITHOLOG'Y -- SANDSTONE StLTSTONE CLAYS~ONE ~,G/CG/TG ~5/18/I~75 ~ 12 000 90/01/15 TD P BT,D PRE SEN T OPERA T [ON'S FO. RMA T I ON PROGRESS 12358-00 0'.00 DRILLING AHEAD C-8 B 12 090 350-00 REMARKS: TYPE REMARK UP UP REMARKS 0%00 HOUR UPDATE - DRILLING AT 12 ~02 WITH INTERMITTENT HARD STREAKS OF 5-7 FPH. REPORT DARE: 04/23/00 USER OEFINED REPORT PAGE LI LI GE LITHOLOGY -- SANDSTONE 6 SHALE - POSSIBLY THROUGH THE BG/CG/TG -- 40/I8--65/NA 90/'01/1 6 TD PBTD PRESENT OPERAT [ONS FORMAT ! ON PROGRE SS ,,... ,,... ,m, ,am 12a34.00 O,.00 TIH W/ DP CONVEYED LOGS C-8 t I;3 000 ?6.00 12! ~: REMARKS: T¥:PE REMARK UP L ! GE REMARKS 0400 H,OU~' UPDATE. ~ TRIP IN HOLE WITH LOGGING TOOLS TOTAL LENGTH' = 83 ON 3--1/2~" X 5e DRILLPIPE. LITHOLOG~ - SHALE AND COAL BG/CG/TG - 90/0i/t? TD PBTD PRESENT OPERATIONS FOR'MA T I ON PROGRE SS 12~!.3~.00 0..00 TIH TO CONDITION FOR LOGS C-8 a 12 0g0 0.00 TYPE REMARK UP UP UP SU SU SU SU SU SU REMARKS OqOO~ HOUR ,~LIPDAT,E- WORK TIGHT SPOTS FROM [2 OO0 TO BOTTOM ON TIH X REAM 5 JOINTS TO BOTTOM X CIRCULATE IN PREPARATION FOR SHORT TRIP. 2~ HOUR SUMMARY - RECEIVED NEW DRUM OF ~IRELI'NE FOR SCHLUMBERGER ON EVEN I'N~ BOATLOAD ~ PERSONNEL AND CHANGED OU~ SA~E~, REDRESSED AND CHECKED AL~ LOGS AND ~ET CONNECT TOOLS FOR NEX~ LOGGING ATTEMPt. AFTER REVIE~IN~ PRE~[OUS ~IRELINE FAILURE INSIDE DR[LLPIPE PLAN TO TRIP' TO BOTTOm' ~ITH LOGS INITIALLY ON THE NEXT ~UN. REPORT DATE: 0~/23/g0 USER DEFINED REPORT P AGE . ,¢ 90/01/18 TD PBTD PRESENT OPERATIONS 12434'00 0.00 RIH W/ IRT CONNECT WIRELINE FORMAT I ON PROGRE SS C-9 ~ I2 003 0.00 12| ~: REMARKS: TYPE REMARK ~P UP UP REMARKS 04~00 HOUR UPDATE -- FINISH RIM ~ITH ~ET CONNECT X 5T~ lO00 ABOVE DOCKING ~AD ANO: CIRCULATE FOR 15 M_[.NUTES TO CLEAN OFF DEBRIS X LATCH INTO D~K[NG ~AD AND TESTED OK X POIER ~ LOGS X CO~O :~T GET SONIC ANO [,~:~T[ON COGS TO ~FU~T[ON TOG,EThER - ~Y SEPARATELY X TIH ~ITH ~'ILLP1PEZ~IRELI~ AND LOG GOLfiNG DOWN ~[TH INDUCTION ~LY X SOHE TOOL, DRAG AT tO 900 &,' ti 450 - X LOST POWER TO TOOL AT TOH'TO SIDE DOOR SU~ TO CHECK WI, RELI~ X COOKS GO00 ~[TH NO'R~AL DRAG, X FO'UNO A COUPLE "R~,LED~ SPOTS IN ~%REL[~ 10 ABOVE SIDE DOOR X UNSEATED E~OM ~T CONNECT AND ~[REL[NE AND STINGER TESTED OK X C[RC~ATE t5 M[~TES TO CLEAR TOP DOCK[:NG HERO X PREPARING TO LATCH ~ACK INTO ~ET ,CONNECT TO SE~ [~ WE CAN MAKE C~NNE~CT[ON TO COGS AGAIN ANO THEN LOG BACK INTO THE HOLE WITH BOTTOM OR THE LOGS DIE -- WHICHEVER COMES FIRST~ ESTIMATED LOG TOPS FROM INDUCTION ARE AS FOLLOWS: C-~ l 0 767 C-5 10 979 C-7 I I 426 C-8 l t 6O8 C-9 12 00'3 ' 90/'01/19 TD P,BTD PRESENT - OPERA T IONS FORMAT I ON PROGRESS ~mm~m~ ~m mm~ ~mm~ 12434.00 0.00 TOH V/ITH DP CONVEY~EO LOGS C-c) ~ 12 003 0-00 REMARKS: 'TYPE REMARK UP UP REMARKS 0400 HOUR UPDATE- RECOVER WIRELINE X PUMP SLUG X TRIP OUT OF THE HOLE. TO LOGS AND RIG DO~N SAME. REPORT DATE: 04/2..3/90 USER DEFINED REPORT PAGE 90/01/20 t~! .... RE - ~--,-~ MARKS. TD PELTO t2434, O0 0.00 PRESENT OPERATIONS TRIP OUT FOR 5.5" LINER FORMATION C-9 ~ 12 0O3 PROGRESS 0.00 TYPE REMARK UP UP SU SU SU SU SU SU SU SU SU SU SU SU REMARKS L INE'R. 2~ HOUR SUMMARY - DUE TO THE STICKY HOLE COND[TZONS FROM 1.2', z~O0 -124~,3~ T~ DEC,SiON WAS ~AD'E TO ONLY CLEAN, OUT TO t2 ~'402 AND ~:RUN T~ LINER TO T,~AT DEPTH. THIS WOULD PLACE T:HE BOTTOM OF T~ LINER 165 BELOW THE ~ANNED ~O~TOM PERFORATION OF [2 21'~ OR 55 OF RATHOLE TO THE LANDING COLLAR. O~00 ~O~ UPDATE - CONT[~ TO TRiP OUT ~ HOLE FOR 24 'HOUR SUM'~ARY - DUE TO THE STICKY HOLE CONDITIONS FRON 12 600 --i243~ THE DECISION WAS MADE TO ONLY CEEAN OUT TO [2 402 AND' RUN T~ LINER [0 THAT DEPTH. THIS WOULD PLACE THE BOTTO~ OF ~HE LINER 185 ElELOW THE PLANNED BOTTOM P'ERFORATION OF [2 21'1 OR 55 OF RATH~E TO THE LANDING COLLAR. TO PELTO ,PRE SENT OPE. RAT IONS FORMAT I ON PROGRESS 90/01/21 12,~3z~.00 0.00 CEMENT 5,,.5m~ LINER c-g B 12 003 0.00 121 '-~:~,*- REMARKS: TYPE REMARK UP UP up REMARKS 0%00 HOUR UPDATE -- DISPLACE CE~NT ~[TH 169 'El,BLS MUD AND ~UMP THE PLUG 2 BELLS EARLY WITH ~000 PSi FENAL CEMENTING PRESSURE X FLOATS HELD X ROTA~ 20 TIMES TO RELEASE FROMM HANGER X PULL 3 STDS AND REVERSE CERCULA~ X SAW SPOTTY CEMENT AT SURFACE ON ~OTTONS UP 'X RAN 50 JTS 5~[/2 [NCH P-[[O ST/L L[NER TO ~2~00 FT ON BAKER HNC HYORAL[C HANG~R X DROP BALL X SET ~ t0305 W/IOK~ SLACKOFF PHP 2~ ~LS CW-IO0 CHEMICAL WSH X SO B~LS SPACER 3000 X tO BBLS aT X 85 B~'LS G ~/l.O SPS 0-600 0.0'~ GPS D-~35 X O.a% 3% KCL X 0.05% GPS D-&'? X DISPLACE W/[O B~LS WT X tO9 B~S REPORT DATE: 0/.I./23/90 USER DEFINED REPORT PAGE UP UP UP UP UP UP .MUD X PMP PLUG 2 BBLS EARLY W/3000 PSI FCP X FLOATS HELD. 0,400 HOUR UPDATE - DISPLACE CEMENT ~WITH 169 BBLS MUD AND BUMP THE PLUG 2 BBLS EARLY WITH 3000 FINAL CEENTIM PRESSURE X FLOATS HELD X ROTATE 20 TIMES Ti3 RELEASE FROM HANGER X PULL ~ STDS AND REVERSE C[RCULATE X SA~ SPOTTY CEMENT AT SURFACE ON BOTTOMS UP X TOH. 90/01/2 2 TD PBTD PRE SENT OPERAT l ONS FORMAT I ON PROGRE SS 12434.00 0.00 PICK UP RTTS PACKER C-9 $ 12 003 0.00 REMARKS: S~ S~ uP UP UP RENARKS (~00 H0t~R UPDATE -- PICK UP t5 JE~:INTS OF 2--7/8# TUBING FOR TAILPIPE AND RTTS PACKER X INSTALL RUTURE DISK ~ STDS O~ 3-t/~~. PLAN TO SET RTTS AT q~O0 77~3 TVD AND FILL THE 6 STANOS TO 9230 ND 7209 TVO ~I~/9.6 PPG M~D X THIS ~ILL PROVIDE lO2~ OF TRUE VERTICAL HEIGHT ~BOVE TE LINER TOP AT tO 305 MD 8233 TVD OR Sit PSI 1.2 PPG ENW THE NEGATIVE TEST'. THEN PLAN TO POSITIVE TEST 3500 PSl. TRIP IN THE HOLE ~[TH RTTS. 2~ HO~R SU~AR~ - GRANITE POINT t~$87 .~6 HAS ~ S~[TCHED TO COMPLETION COST ACCOUNTING ~N THE F,INAL EST~NA.TED DRY-H~E COST ~AS $3 ~ ~O HO~R U~DATE -- P~CK ~ [5 JOINTS OF 2--~8~ TUBING FOR ~A[LP~PE AND RTTS PACKER X [NST~LL R~TURE DESK 6 STOS OF 3-l/2~e ~PLAN TO SET RTT'S AT ~800 ~7~3 TVD AND F~LL THE 6 STANDS TO 9230 7209 T. VD ~[TH ~.~ PPG ~ X TH~'S ~[LL t02~ OF TRUE V~RT~CAL HEIGHT ABO~E THE LINER TOP AT tO 30~ ~' 8233 TVD OR',Sil PSI i.2 PPG EMN FOR THE N~GATIVE TEST'. THEN ~AN TO" POSITIVE TEST TO 3500 PSI. TRIP IN THE HOLE ~ITH 24 HOUR SU~HARY - GRANITE POINT t7587 ~6 HAS NO~ S~ITCHEO TO COMPLETION COST ACCOUNTING ON THE FINAL ESTIMATED DRY HOLE COST ~AS $3 ~5~ REPORT DATE: USER DEFINED REPORT PAGE 90/01/2~ REMARKS: TYPE REMARK TD PBTD 1243Q. O0 12270 PRE SENT OPER AT IONS REV C IRC MUO ~/ WATER FORMATION C-9 · 12 003 REMARKS 0400 H~ ~DATE- RE~R~ CIRCULATED UNTIL 0300 HRS. T"~ WI, SCRAPER F~, CASED HoLE LOBS.' USED 5 SX SODA ASH $158 ~ TO E C~RGED TO COMPLE T ION.. PROGRESS O. O0 90~'01 ~'25 ( 121 ~ REMARKS: TYPE REMARK UP UP TD , ~BTO PRE SENT OPERA T IONS F F. JRMA'T I ON P ROGRE SS I24~4.00 i~270.00 TON W/ GYRO 'TOOL C-'g ~ 12 003 0~.00' REMARKS 0400 HOUR UPDATE - RIG DOWN FLANGED LUBRICATOR. CNANGED WIRELINE DRUMS. TIM W/ GR-NEU-CCL LOGGING TOOLS. TO PBTD PRE SENT OPER AT I DNS FORMAT I ON PRO,GR~SS 90/01/26 t24~4-00 12270.00 TOH, C L/D DRILL PIPE. 5.5'm 20 ~/FT LINER 0.00 90/01128, 1243~.,00 12270.00 R~ DUAL 2-7/8~v BUTT TUBING 5.5~ 20 t/Fl LINER 0.00 90/01/29 12~34.00 12270.00 SPACE OUT TBG FOR LANDING 5.5" 20 8/FT LINER' 0.00 TYPE REMARK UP UP UP REMARKS 0~00 HOUR UPDATE - HYDROTESTED TUBING HANGERS TO tl. O00 PSI. INSTALLED BPV S. LANDED TUBING W/ c)OK LONG STRING WEIGHT ~.. ?IK SHORT STRING WEIGHT. RIGGED DOWN DUAL EQUIPMENT. REMOVED BOP RAMS CLEANED AND GREASED INSIDE OF BOP EQUIPMENT. REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE 90/0 t/30 90/0 t/3 l 90/02/02 90/02/03 ', REMARKS: TYPE REIqARK UP UP UP TD PBTD 12434, O0 122 70. O0 t 243,4 . O0 1227'0, O0 12434. O0 122 ?0. O0 12434.00 12270, O0 PRESENT OPERATIONS THAW DRAINS - CLEAN RIG CLEANING DECK AREA PREP PITS FOR DIESEL PREP TO CUT SHORT SIRING FORMAT I iN 5.5~' 20 ~,/'FT LINER 5,5# 20 ~/FI LINER 5-S# 20 ~/FI LINER 5.5# 20 ~/FT LINER REMARKS 0400' HOUR UPDATE - HAVE MADE CUT WITH. APR LOST 2'000~ TBG WT AT *TIME OF CUT AND ARE CONING OUT HOLE TO RIG DO~N 'APR PROGRESS 0,00 OD O0 0o00 0.00 90/0210~ TO PB'TD PRESENT OPE'RAT'I OHS FORMAT ! ON PROGRESS 12434.00 12270.00 LAY DOIdN KOBE CAVITY 5,5# 20 i~/FT LINER 0.00 REMARKS: TYPE REMARK SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU 5U SU SU REMARKS 24 HOUR SUMMARY - THE TRIP OUT DF THE HOLE ~AS SLOW DUE 'TD ~DRKIN'G ~[TH THE VERY LIMBER 2-3/8 TSG HA~V~I'N6 TO BUILD THE PIPE RACK FOR THE SHORT STANDS AND INSTALLING PUPS ~HEN NECESSARY. 000000000000000 00000 O000000000_OOOO000000000OO0000000 0000000000 O0 THE KOBE CAVITY ~.E WERE TO RUN BACK IN ~ITH WOULD NOT PRESSURE TEST. THE SECOND PU:~P CASING FROM THE TOP DOWN HAD A VERTICAL SPLIT I.N THE CENTER AREA ~ THE CASING APPROX. 3/~" LONG. THE DEC:ISION MADE TO REPLACE THIS SECTION WITH THE ONE OUT OF THE OTHER 'CAVITY MIKE KENNEDY THE TRICO/KOBE REP WAS ON THE PLATFORM FOR THE PRESSURE TEST AND REPAIR OF THE CAVITY. THIS CAVITY IS ACTUALLY A USED ONE OUT OF W'ELL ~5 ON THE BRUCE. MIKE SAID THEY HAD NOT 'TESTED IT IN THE SHOP PRIOR TO SENDING IT TO US. THE CROSS OVERS THEY NEEDED TO TEST ET ~ERE ON ORDER BUT HAD NOT ARREVED AT THE TIME ~E CALLED FOR IT. 00000000000000000000 O000000000000OO0000000000000OO00000000000000 TH~ CAVITY THAT CAM~ OU~ OF TH~ HOLE HAO [T S PROBLEMS. THE BOTTO~t PUMP CASING AND STANDING VALVE REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SD SU SD SD SD SEAL BLOCK WERE T~ISTED OFF CENTER TO THE REST OF THE CAVITY. A ROCK FELL OUT OF ONE THE SEAL BLOCKS AND A WASHER LOOKING AFAIR CAME OUT OF ONE OF THE SIDE TUBES WHILE WE WERE DISAMBELING IT TO GET THE PUMP CASING. O0000000000000000000000000000000000Q 0000000000000 O00000OO00000 O0 THE X--O 2-7/8 8RD X 2-?/8# BUTTRESS GOING IN TO THE TOP OF THE CAVITY WAS UNDER DRIFT SIZE OF THE TEIG 2.3125 DRIFT 2.347 · T:HE X-O WE, ARE NOi GOING TO RUN IS 2,.42~75 ID- O0 O0 O000000000000000 O000 O0000O O0 0000 000000000 O0000 O0 O00000000000 WE ALSO FOUND THAT IN THiS TYPE CAVITY A' STANDARD LENGTH CUP NANDERAL IS MUCH TO SHORT. IT ALLO'~S BO'TH CUPS TO ,ENTER T~E CAVITY BODY AND BOTH,,~ HAVE TO PASS THROUGH' THE X-O AT THE TOP O,F THE CAVITY. ~E ARE HAVING TWO NANDERLS MADE UP 66". THIS LENGTH ~ILL KEEP THE BOTTOM CUP ABOVE THE X--O. WE RAN THE EXTENSION ANNA USES ON THEIR PUMPS ON OUR LAST RUN BUT IT ~SO ALLOWED THE CUPS TO PASS THROUGH THE X-O. ~IKE KENNEOY SAYS THAT IF THE CUPS SHOED HANG IN THE X-O AREA IT COULD CAUSE PREMATURE INGUAGING OF ANY PUMP SEAL THAT HAPPENED TO BE IN LINE ~ITH A CAV'I'TY SEAL AREA. TO PBTD PRESENT OPERATiO'NS FORMATION PROGRE 12434,00 12270,00 TIH DUAL X HYDROTEST 5,5" 20 #/FT LINER 0,00 REMARKS: TYPE REMARK SU SU SU SU SU SU SU SU SU SU SU SU SU REMARKS HOUR SUMMARY - DAILY COSY.= $14 OBQ'CUM COST: 163 82! COMPLETION ONLY': $68~ 863 0000000000000000000000000000000000000000000000000000000000000000 HAD SOME REAL PROBLEMS GETTING THE KOBE CAVITY TO TEST. INI~TiAL PROBLE)4 WAS IN THE STANDING VAL'VE SEAT AREA. WE CHANGED OUT SEATS IN BOTH THE C=AVITY AND, THE 'TEST PLUG A HALF A DOZEN TI~4ES, NO MATTER WHAT WE DID WE COULDN T CURE THE LEAK. NtADE DECISION TO SWAP OUT CAVITY BOTTOM ENDS BUILT NEW TEST PLUG OUT A NEW STAND.lNG VALVE WE GOT FROM THE BAKER PLATFORM AND ~ERE ABLE T:O GET A 3500 PSI TEST ON T~ .STANDING VALVE. DURING THIS 'TEST WE DEVELOPED A SMALL LEAK AT REPORT OATE= 04/23/90 USER DEFI'NED REPORT PAGE SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU SU THE UPPER END OF THE PUMP CASING THAT WE HAD PREVIOUSLY SWAPPED OUT. T~HIS WAS NOT GOOD. WE HAD TO BREAK THE CAVITY ALL THE THE WAY BACK DOWN TO THE MIDDLE PUMP CASING TO REPAIR THE LEAK. ON OUR NEXT AND' FINAL ATTEMPT TO PRESSURE TEST WE WAS SUCESSFUI WITH A 3800 PSI TEN MINUTE TEST. 00000000000000000000 0000000000000000 000000000 0000000000000000000 WE INSTALLED A TYPE mBm KOBE PUMP IN THE CAVITY WITH THE TEST PLUG SV IN PLACE AND LOWERED IT IN TO THE MOUSE H~E ON THE RIG FL~. RIGGED UP 2aINLET AND OUTLET LINES EF THE CAVI~T¥ WITH A BYPASS OFF THE STA,ND PIPE MANIFOLD 'TO CONTR[ THE RATE. WE STARTED THE RIG PUMP ~[TH THE BYP~ASS FULL OPEN. ~E CLOSED THE BYPASS UNT~:i'L.L THE PUMP REA'CHEO 36 O:R 72 SPM HARD TO TELL ~T KNOWING THE ACTUAL PO~ER RATE AT 500 PSI', STRO.K'ED PUMP UNTILL WE HAD GOOD RETURNS ON THE S~R'T' STRING Si'DE TEN HIM . STROKES WERE REAL STEADY AND EVERY THING LOOKED NORMAL~ CONSIDEREO #FUCTIONAL TEST" COMPLETE. 90/02/06 REMARKS: TYPE REMARK SU SU SU SU SU SU UP UP UP UP UP TO PBTD PRE SENT OPERATIONS FORMATION PROGRESS 12434.00 12270.00 SPACING OUT TO LANO TBG 5.5" ;~0 ~/FT LINER 0.00 REMARKS 2~% HOUR SUMM~RY - FAIRLY S,LOW TRIP DUE T'O CHANGING OUT HYDROES/ C~PS TOOL SLIPS LAYING DOWN PUPS AND BAD JOINTS. THIS ~-?,'8# T'E)G 8ENDS AND PINCHES VERY EASLY WHEN LE'~LING OUT THE STRING WEIGHT ~[SE. THE ELEVATORS COCK ~O THE WEIGHT SIDE AND 'THIS :2-7/8m~ TOG JUST .~O.N T TAKE ~UCH ~F THIS ACTION 0~00 HOU,~ UPOATE - LANDED TBG X RECKECKEo RA MARKER. WE PULLED THE MARKER UP 4 TO PLACE THE GUNS ON DEPTH WITH THE MARKER AT 10 ~. WE RELOGGED THE MARKER AT 10 6%2. I NOTIFIED DENVER E THE SI TUTA.TION AND GOT THE OK TO CALL IT GOOD BY KIN OVERCASH COULD NOT REACH CRAIG W[GGS REPORT DATE; USER DEFINED REPORT PAGE 90/02/07 90/02/08 TD PBTD PRESENT OPERATIONS FORMATION · m ,,m~ .m..m. ,.~. ,,m. ,mm, .m, ~,,,m..,i,, ,,mm, ,m~ ,,mm, ~mm. ,mm,. ,~,, --.,mm,,-- ~mm, ,mmm~ ,m,, mi, .,mmm, .,mm ,mmm. ,...m, ,m, .,~. ,,..,. ,,,m* ,,m..,,,..~, .,.m. ~ ,,... ,.,.,~ e .,,., .,..~ ,,m,, .,.m ,.,,m~ .,,.~ m ,m,m~ e .,,m,,. ~ . ,,~ . . 12434.00 12270.00 CLEAN MUD PITS & THAW DRAINS 5.5# 20 #/FT LINER 12434.00 12270.00 RELEASED RIG 5.5# 20 #/FT LINER PROGRESS 0,,00 0.00 121 ~ REMARKS: TYPE REMARK REMARKS RELEASED RIG ~ 24100 02--07--90 JOB DATE 90/04/12 90/04/16 90/04/17 90/0¢/18 89/08/24. DRILL ING 89/09/17 DE V EL OP ME N T TOTAL DA [.LY DA i LY DEPTH JOB COST MUD COST 0o00 5825 0 ELAPSED HOURS OPERA T I ON FORMATION PROGRESS 0.00 0.00 0.00 0o00 AC CUNUL A T ED A C CUMU'L A TED JOB COST MUD COST 5825 0 OPERATION DESCRIPTION TOTAL DA I LY DA I LY AC CUMULATED ACCUMULATED DEPTH JOB COST MUD COST .JOB COST NOD COST · F3C.~/0~9/18 O. O0 9125 0 1 ~950 0 REPORT DATE: USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION t2.00 MO OPERATION DESCRIPTION 89/09/19 TOTAL OR I LY DA [ L Y ACCUNUL AT ED ACCUMULA TFD DEPTH JOB COST MUD COST JOB COST MUD COST O. O0 9805 0 24755 0 EL APSE O H OUR $ · ,i~.,i..I,,. ,m,, ! 2 · O0 OPERATION OPERATION DEScRiPTION M O/M I , 8'9/09/20 TOTAL DEPTH 0.00, D A I L Y DA I L Y ACCUMULATED AC CUMULATED JOB COST MUD COST JOB COST MUD COST 11631 0 3,6386 0 E:L A,P SE O HOURS OPERATION 12,00 MO/MI OPERATION DESCRIPTION 89/09/21 TOTAL DAILY DAILY ACCUMULATED ACCUMULATED DEPTH JO8 COST MUD COST JoB COST MUD COST 0.00 10243 0 ~6629 0 ELAPSED FLOURS opERATION ODER ATI.ON DESCRIPTION 14o00 MO/MI LD ORL CROWN 89/09/22 TOTAL O,A I LY DAI L Y ACCUMULATED ACCUMULA TED DEPTH JOB COST MUD COST JOE) COST MUD COST 0, O0 I 371 I 0 60340 0 ~' RFPORT DATE USER DEFINED REPORT PAGE C ,C ELAPSED HOURS OPERAT ION ,,m,~ .,mm,. ,.,m,,.m,, ~,,,,.,,,mm, ..,,* ,..,.,,.,m,,. ,~,m, ,,m~. *,,m ~ .,m 12o00 MO/MI OPERATION DESCRIPTION TOTAL DA ILY DAILY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 0.00 11690 0 72030 0 ELAPS£D HOUR S 12.00 12.00 89/09/23 OPERATION OPERATION DESCRIPTION MO/N I MO/MI TOTAL DA ! LY DAILY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 89/09/24. 0 . O0 1. 5953 0 87983 0 EL,AP SE D HOUR $ OPERA T I ON 12,.00 MO/MI OPERATION DESCRIPTION B9/09/25 TOTAL DA I LY D A I L Y ACCUMUL A,T ED AC CUMULA T ED DEPTH JOB' COST MUD COST JOB COST MUD COST ,me ,,,mm 0 ,. 00 I 1569 0 99552 0 ELAPSED H OUR S (]P ER A IT I ON ! 2.00 OPERATION DESCRIPTION 89/09/26 TOTAL DA I L Y DA I LY ACCUMUL A TED ACCUt~ULATED DEPTH JOB COST MUD COST JOB COST HUD COST O. O0 15249 0 114001 0 (- REPORT DATE; 0~,/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 12.00 MO/MI TOTAL DEPTH 0.00 DA I L Y' DA I LY ACCUMUL AT ED AC CUMULATED JOB COST MUD COST JOB COST MUD COST · · am,al. ~ 17800 0 13260 l 0 ELAPSED HOUR $ OP ERA T I ON 13,00 ~I OPERATION DESCRIPTION 89/09/28 TOTAL DA i LY DEPTH JOB COST EL APSED HOURS OPERA T I ON 12.00 NI DAI~LY ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 0 1~5295 0 OPERATIO'N DESCRIPTION 89/09/29 T O T A L O A I L Y DA ! L Y A C CU MU:L A T E D A C CUt~I U L A '1' iED DEPTH JOB CQST MUD COST JOB 'COST MUD COST ELAPSED HOURS OPERAT ! ON ,ii ,.., ..i, ,,,~I ,....,m ,.i,. ~ 12.00 ~I OPERATION DESCRIPTION TO TAL DA I L V DA IiLY AC CUM:UL ATED ACCUMULATED OEPTH JOB COST MUD COST JOB COST MUD COST ~9/09/30 O, O0 12141 0 180330 0 REPORT DA[E: 04/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERATION 12.,, O0 MI OPERATION DESCRIPTION 89/10/01 TOTAL DAILY DAILY ACCUNULATED ACCUMULATED ,OEP!TH JOB COST MUD COST JOB COST MUD COST 0.00 1239~ 0 Ig2724 0 ELAPSED HOURS OPERATION 12.00 MI OPERATION DESCRIPTIO,N 89/10/02 TOTAL OA I LY DA I LY AC CUMULATED ACCUMULA TED DEPTH JOB COST ~4UD COST JOB COST MUD COST 0,00 13151 0 205875 0 ELAPSED HOURS OPERATION 12.00 MI OPERATION DESCRIPTION 89 / 10/03 TOTAL DAILY DEPTH' JO8 COS T 0,00 13151 ELAPSED HOURS OPERA T I ON 12.00 MI ,DA I LY ACCUMULATED ACCUMULATED MUD COST JOB COST N:UD COST 0 219026 0 OPERATION DESCRIPTION TOTAL DA I L Y DA I LY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 0/04 O. O0 118~-0 0 230866 0 REPORT DATE: 0,~/23/90 USER DEFINED REPORT PAGE EL AP SED HOURS OPERA T I ON 1.2.00 MI OPERATION DESCRIPTION 69! 10~'05 TOTAL DA I LY DA ILY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 0. O0 I 373~ 0 2~60~ 0 ELAPSED H DO R S DP E R A T 'I ON 12.00 OTHER TI 2 · 00 OT HE R 0PERATION DESCRIPTION ~4ORNIN,G TOWER - INSTALL WOOD ON DECK AROUND DRILLER S STATION - L~D KELLY SWIVEL ~ DRIVE BUSHINGS - CHANGE ROLLERS IN LINE GUIDE - P~U LB~00 SWIVEL .TRI--KELLY & DRIVE BUSHINGS MORNING TOWER -- M,/U S~IVEL .~ KELLY COCK TO KELLY - R~U A[R L[N~S TO ~3 MUD PUMP - R[U D~ATER LINE TO HYDROMAT[C BRAKE - ~ELD [N SHAKER ROOM - REMOVE FRAME FRO~ L~C~ MOORE CRANE FOR RiG CLEARANCE - REPAIR VALVE ON HIGH PRESSURE MUD MANIF~D 89/10/06 TOTAL DAILY DAILY ACCUMULATED ACCUMULATED DEPTH J0~ COST MUD COST JOB COST MUD COST 0.00 18060 0 2'6266~ 0 ELAPSED H OURS Op EiRA T ! ON- 12.O0 OTHER 12.00 OTHER OPERAT!ON DESCRIPTION MORNING TOWER: WELD ON ~UD HOPPER LINES ~ TRIP TANK DRAIN - PLUMB IN. SALT WATER LINE IN: SHAKER ROO~ --, CHANGE VALVE ON CHARGE MANIFOLD - ~ELD IN SHAKER PITS - MOVE BANG BAR IN DERRICK. EVENING TOWER: RIG UP HANGERS FOR (~ MUD LINES -- CLEAN UP SCRAP IN SHAKER PITS & UNDER RIG - INSTALLING PUMP CONTROL LINES - PRIME & PAINT NEW LINES. 89/10/24 TOTAL DA ILY DAILY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MuD COST 0.00 I 0B0 ! 8 0 370 (582 0 REPORT DATE: 0,~,/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 12.00 OTHER l ;!. O0 OTHER TOTAL DEP TH .m,, ,m~ 89!t0/25 220. O0 EL APSED H OUR $ O P E R A T I 0 N 12'. 00 OTHER OPERATION DESCRIPTION MORNING TOWER - REPAIR HEATER IN SHAKER ROOM AND DESANDER ROOM X RIG LiP MUDLINE FROM DECK TO RIG X WORK ON FLOORING X NIX SPUD MUD X CLEANUP SCRAP LUMBER METAL ETC FROM DECK AREA X FINISH BOLTING idIRELINE HOUSE TO WI!NO,ALL EVENING TOWER -- CHANGE SHAKER SCREENS X HOOKUP AIR LINES TO TRIFLOW CHOKE PANEL X RESET CEMENT TANKS AND UNIT X WELD ON WI'RELINE UNIT MUD PITS SHAKER ROOM AND MUD TANKS X RIGUP FITTINGS FOR PRESSURE SENSORS IN SHAKER ROOM DAI L Y DA I L Y AC CUMUL AT ED ACCUMULATED JOB. COST MUD COST ..,fOB COST MUD COST 9 g79 4981 380661 ~ 08 'l 12-00 OTHER OPERATION DESCRIPTION MORNING TO~ER - RIGUP LINES FROM, DRILLING RECORDER AND DRILLER WEIGHT IN CONSOLE. TO PRESSURE SENSOR AND FRO~ MUD PU~4P PRESSURE X FINISH RIGUP WEIGHT BUCKET FOR SPINNER HAWK X CHECK OUT P~NP CONTROL LINES X CLEAN ~ S~RAP METAL EROM SHAKER ROOM X RIGUP TEST PUMP AND TEST MUD LINE AND VALVES TO 3000 PSI X REPAIR LEAKS IN MUD LINE EVENING TO~ER -REPAIR LEAKS IN HIGH PRESSURE ~UD LINE AND TEST TO 3000 PSI X HANG SHEAVE FOR ~[RELINE UNit AND STRING ~ LINE X STRING UP GEOLOGRAGH L%NE X WORK ON TRIP TANK X WORK WITH WELDER AROUND RIG X MODIFY DER~[NE STABILIZER X ~AKEUP ~7-t/2mm RETIP ~[T 26a HOLE OPENER "AND REMAINDER OF BHA X STRAP WELD SAME TOTAL DAILY DAILY ACCUMULATED DEPTH JO8 COST MUD COST JOB COST 89/10/26 319.00 a?161 1182 ~2'7822 E L A P S E D H OU R.S OPERATION RUTOOL 1.00 ..... ACCLtMULATED OPERATION DESCRIPTION STRAP HOLE OPENER TO 17--1/2m' JET REPORT DATE= 0~/23/g0 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION °50 OTHER 2°00 PU , 1.00 TRIP 5.50 C MUD .50 TRIP 1.50 PU 1,50 RUTOOL .50 TRIP 1,50 RIGREP 2,50 DRL 1, O0 SURVEY ! . O0 'IR IP 2.00 PU .50 SURVEY !. O0 DRL . 5.0 SURVEY OPERATION DESCRIPTION INSTALL DEADLINE STABILIZER IN DERRICK PICK-UP DRILL COLLARS AND KELLY AND CONNECT KELLY HOSE TIM AND TAG UP AT 220 X DISPLACE HOLE WITH INLET WATER X DRILLOUT 30" DRIVE PIPE AND WASH 8 BELOW 30" X DISPLACE MOLE TO SP® MUD CONDITION SPUD MUD tO ~5 SECOND VISCOSITY AND EVEN OUT MUD PROPERTIES IN MUD TA~S TOH TO CHANGE 8MA PlUCK-UP JETTING BNA WITH TWO 17--1/2a SLEEVE STAB. ILIZERS A~ ORIENTATION S~ RIG--UP DRESSER ATLAS ~IRELINE AND GYRODATA TOOLS AND EQUIPMENT TIM AND TAG BOTTOM AND CIRCULATE BOTTOMS ~ WORK ON ~2 & ~3 PUMP LINERS AND SHAKER OI'LERS DRILL FROM 228 - 27.0 WITH JETTING 8HA X JET EASILY FOR THE FIRST 13 AND THEN IT WAS ~ABLE TO MAKE ANY PROGRESS WITHOUT ROTATING X ROTATE DOWN THE NEXT 29 ~HILE ATTEHPTiNG TO JET EVERY 5 RUN SIN~E SHOT GYRO TO CHECK PERFORMANCE OF JETTING 8H A TON FOR MUD'MOTOR AND 2,0 DEGREE BENT SUB X LAYDOWN SIABLiZERS TOOLS ETc PICKUP DYNADRILL DELTA 500 AND 2eO DEGREE BENT SUB ANO NEW 53~S ~[TH ~-~S X ORIENT ~HA AND T[H ~NT ON ~OTTOM WITH GYRO AND ALIGN TOOL LACE sETTING AT NSOW WITH 25 DEGREES LEFT HAND TORQUE 'OR~LL '~[TH MM FROM 2TO-, '~9 ~TH 2--~K~ WO~ AT ~-~.5 M[N/FT SURVEY WITH GYRO AND AOJUST TOOL FACE ~OR ~5 DEGREES LEFT HAND TORQUE T OTA L DA '[ L Y DA IL Y AC CUMULl T ED A C CUMUL A T E D DEPTH JOB COST MUD COST JOB COS/ MUD COST 8'9/10/27 585 . O0 20 652 88'7 448q 'lq 7'050 ELAPSED HOURS OPERAT ION l .00 DR,L , 50 SUR VE Y OPERATION DESCRIPTION DRILL FROM 319 - 344~ GYRO SURVEY AT 300 REPORT DATE: 04/23/90 USER DEFINED RE. PORT PAGE ELAPSED HOURS OPERAT ION 2.50 DRL 1 o O0 SURVEY 2.00 DRL .50 SURVEY I . O0 DRL I . 50 SURVEY I ,. SO ORE .50 C IRC 4.00 OTHER 1.00 SURVEY .50 DRL 1.50 CIRC 1.50 TRIP 1.50 PU 2,00 DEE 89/10/28 TOTAL DEPTH: 585. O0 ELAPSED HOUR S 3 · :00 1.00 I. O0 ! .50 11.50 1.50 OPERATION DESCRIPTION DRILL FROM 344 - ~og GYRO SURVEY AT 365 DRILL FROM 40g - GYRO SURVEY AT 410 DRILL FROM 468 - 498 GYRO SURVEY AT 450 ROTARY DRILL FROM 498 - 55g WORK ON GYRODATA GYRO TOOL X PROBLEMS WITH ELE~TR~ICS X CI, RCULAT[NG HOLE X RIGUP HAROLD BROWN $IN~E SHOT S~,VEY TOOL AND EQUIPMENT SINGLE S~T S~VE~ AND ORIENT MUDNOTOR TO HIGH SIDE TO DRILL TO CASING POINT ORIEL FROM' 55~ - 585 CIRCULATE 'ANO CO. ETON HOLE X ~AIT ON GYRODATA GYRO PAR~S FROM ANCHORAGE ~ WRONG PARTSDELIVERED X ~IG DOWN DRESSER ATLAS WIREL.INE TOH AND LAYDO~N MUOMOTOR 8HA PICKUP 26~ HOLE OPENER ~HA AND STRAP ONTO DRILL COLE AR TIH- WASHED TO 250 X OPENHOLE TO 2~ FROM 228 - 00000000000000000000000000000000000000000000000000000000 OJ D A I LY 2 ~ 6 ? OP ERA T I ON DRL DAILY ACCUM~ULATED ACCUMULATED MUD COST JOB COST MUD COST 1735 4F6941 8755 CIRC TRIP TRIP OTHER PEt OPERATION DESCRIPTION OPEN HOLE TO 26mm FROM 322 TO 387 W'ITH I O-ISK# AND ~0-?0 RPM X TAG 20~ CASING OF GP70~ AT 387 X UNABLE TO ROTA'TE OVER THE TOP OF CASING. CIRCULATE H~E CLEAN. TOH AND CUT STRAP OFF HOLE OPENER AND LAY DOWN 5A~E, P/U CEMENT DIVERTER TOOL AND T IH TO 'PLUG BACK X 12 JTS OF ~9.58 xg5 OPe ~IRCUL~'TE ~ND CONDITION HOLE FOR PLU~ B~CK ~HILE WA ITIN~ ON 700 SX CEMENT FRO~ THE AL~SK~ HUSKY. R~U DOWELL IRON AND PRESSURE TEST TO 2000~ X MIX AND PUMP 1200 SX CLASS ~Gmm CEMENT ~ITH 3~ ~A~L2 Sl REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERA T I ON !. O0 TRIP I. O0 :Cf RC .50 LD 2. O0 WOC OPERATION DESCRIPTION 0.2:[ DEFONER 046 AT I5.5-[6.4 PPG X DISPLACE LINES WITH I BBL OF WATER. RIG DOWN DC)WELL AND LAY DOWN CIRCULATING HEAD X TOH SLOW TO !gl. KELLY UP AND CIRCULATE EXCESS CEMENT FROt4 INSIDE 30" FRON 19'1-220 X ROTATE AND WORK PIPE TO HELP DISPLACE CEI~ENT X DUMPED APPROXIMATELY 50 BBLS OVER BOARD. SET BACK KELLY AND BLOW DOWN SAME X TOH AND LAY DIV'ERTER TO~-. CLEAN SHAKERS AND SHALE PIT X DUMP CLABBERED MUD FRON MUD TANKS WHILE TOTAL DAILY DEPTH J08 COST 244.00 ELAPSED HOURS OPERATION S.O0 5.00 DRL l.O0 CIRC .50 TR~:iP l.O0 TR:~P 1.50 S.50 DRL 1.00 TRIP I.O0 TRIP 1.50 DRL DA I L Y ACCUMUL ATE D ACCUMULA TED MUD COST JOB COST MUD COST 2363 535303 11148 OPERATION DESCRIPTION WOC AND CLEAN PITS AND UNDER RiG X CUT 120, OF DRILLING LINE X SLIP PICKUP 26 DRILL CENENT ~0~ 15g-235 X DRILLING. AT ~5-20 FPH INSJIOE OF 30~ CASING AND SLOWED TO 3-5 FPH ONCE INTO OPEN HOLE CIRCULATE HOLE TO CLEAN UP FOR ~O[OR RUN TOH AND LAY PICKUP D--SOO AND 2 DEGREE BENT SUB AND TIH ORi, ENT TOOL FACE ~I'TH GYRO DR~LL ~ITH ~'D ~OTOR ~ITH A DUE ~EST TO~ FACE FROM 235-292 X GYRO SURVEY AT 2~6 ~ 289 TQH AND LAY DO~N ~UD ~O'TOR PICKUP 26e~ HOLE OPENER AND TIH OPEN HOLE FRON, 220-24~ X TI~E DRILL OFF CENENT PLUG TOT AL D A [ LY DA ! L Y AC CU~UL ATE D AC CUHULA TED DEPTH JOB COST MUD COST JOB COST ~IUD COST 560 · O0 23054 405 558357 I 1553 REPORT DATE: USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION t.,O0 DRL 1.50 CIRC 1.00 TRIP · 50 TRIP ,50 OTHER 3,00 DRL .50 SURVEY 3.50 ,DRL °50 SURVEY 2.50 DRL .50 SURVEY 1.50 DRL · 50 SURVEY Io00 DRL .50 SURVEY 3.00 DRL .50 SURVEY 2.50 ORE .50 SURVEY OPE RAT I ON DE SCR I PT I ON OPEN HOLE TO 26" FROM 24~4-288 X CEMENT qUALITY STARTED TO IMPROVE BELOW 280 CIRCULATE THE HOLE CLEAN TOH AND LAY DOWN HOLE OPENER PICKUP D--500 MUD MOTOR AND 2.5 DEGREE BENT SUB AND TIH ORIENT TOOL FACE TO DUE SOUTH FOR FULL DROP TURN AWAY FROM THE CEMENT PLUG DIRECTIONAL DRILL FROM 292'--2319 X TIME DRILL OFF OF CEMENT PLU AT 10 AND 5 MIN~"FT FOR THE FIST 10 AND 20 RESPECTIVELY. GyRO S~,VE'Y DIRECTIONAL DRILL FROM 31g-350 X CONTROL DRILL AT t2 F T/'HR GYRO SURVEY D[REC'TIONAL DRILL FROM' 350-380 X CONTROL DRILL AT !5--20 FT/HR GYRO SURVEY DIRECTIONAL DRILL FROM 380-410 X DRILLING AHEAD AT 40.-80' FT/HR WITH tO=KS WOB GYRO SURVEY DIRECTI'ONAL DRILL FROM 410-440 GYRO SURVEY DIRECTIONAL DRILL FROM 4~0-500 GYRO SURVEY DIRECTIONAL DRILL FROM 500-560 GYRO SURVEY 10T AL DA ! L Y DA I LY ACCUMUL A TED ACCUMULATE D DEPTH JOB COST MUD COST JOB COST MUD COST 625. O0 6,6067 2858 624424 1441 I ELAPSED HOURS OPERATION 2, O0 DRL l,O0 C. IRC 1,50 TRIP ,50 TRIP [9.00 DRL OPERATION DESCRIPTION ...............................-------- 2' ......... - - OI ECTIONAL DRILL FROM 545-625 X GYROR 'T 000000000000000 00000000000000000 0000000O000000 00000000000.~ CIRCULATE THE HOLE CLEAN TON AND LAY DOWN D--500 AND 10 JTS HWDP PICKUP 26" HOLE OPENER AND T IH TD 288 OPEN HOLE TO 26mm FROM 288-616X NO PRDBLEMS CDMING REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOUR S OPERA T I ON .,11. ,.m, .,.lis ,,... 4.l~ ,.,.~ ...., OPERATION DESCRIPTION OFF SIDETRACK PLUG WITH HOLE OPENER 89/11/01 TOT AL DA I L Y DEPTH JOB COST 625, O0 6729~ ELAPSED H~RS OPERA, TIE .50 DEL .50 CIRC ~ 1.00 TRIP .50 CIRC 1.00 TRIP 8*00 CSGCMT 1.50 TRIP 7°00 WOC ¢.00 ND DA I L Y AC CU~UL ATE D AC CUNULA TED MUD COST JOB COST MUD COST 1013 691718 .15424 OPERATION DESCRIPTION OPEN HOLE TO 26# FRO~ 616-625 CIRCULATE BOTTOMS UP SHORT TRIP TO 30~ CASING SHOE WITH NO TIGHT SPOTS CIRCULATE BOTTOMS UP AND PUMP I00 BBL HIGH VISCOSITY SWEEP · TOH AND LAY DOWN 26mm HOLE OPENER. RIG UP CASING CREW AND RUN 618 15 JTS X56 CASING ~ITH VETCO LS-2 CONNECTIONS AND LAND AT 6%6 RKSe TIH WI'TH DRILLPIPE AND STINGER AND STAB-iN ~ITH 5K~. CHAIN DO~N CASING AND CIRCULATE 80TTONS UP. PUMP 50 88L ~ATER SPACER AND ~IX/PUMP 5qO SX 210 88LS CLASS *eG~e WITH 10~ GEL SALT~ D4& 2~ CACL2 $1 AND 0.2~ DEFOAMER O~6 AT 12.8 PPG. GOOD CEMENT RETURNS TO SURFACE AND S~[TCHED TO TAIL SLURRY OF 500 SX IO:~~ 88LS CLASS ~Ge WITH 3[ CACL2 S1 AND 0.21 DEFOAMER O,16 AT 15.8 PPG. ALL CEMENT PU~PED AT 5 BP~ AND 150 PSI, DISPLACED CEMENT WITH 5 BBLS WATER AND CH:ECKED FLOATS - O.K. UNSTING AND RIG DOWN CEMENTERS, TOH WITH DRILLPIPE AND LAYDO~N CENTRALIZERS AND ST AB' I N TOOL. CLEAR RIG FLOOR OF TOOLS X CENTER 20" ON ROTARY TABLE X NIPPLE DOWN 30a RISER AND CUT SAME X CEMENT FELL APPROXIMATELY 10 IN 20" X 30" ANNULUS PULL ROTARY 'TABLE AND 30" RISER X INSTALL ROTARY TABLE X CUT HOLE IN 20" AND DRAIN X CUT AND WELD GUSSETS AROUND 20~ 89/11,/02 TOTAL DAI?LY DAILY A:CCUMULATED ACCUMULATED DEPTH JO8 COST MUD COST JOB COST MUD COST 625, O0 6729~ 199 759012 15623 RFPORT DATE: 04/23/rJ0 USER DEF!NED REPORT ELAPSED HOURS OPERAT ION 24. O0 ND REMARK OPERATION DESCRIPTION NIPPLE UP DIVERTER SYST CUT 20" LANDING JOINT. WELD ON 20 CSG HEAD TEST WELD TO 500 PSI. NIPPLE UP 20# RISER AND 20" ANNULAR PREVENTER, NIPPLE UP tO" DIVERTER LINES AND VALVES. 0400 HR UPDATE - FINISH NIPPLE UP DIVERTER SYSTEM FUNCT:iON TEST. PU BHA NOT~FiED MIKE HINDER WITH AOGCC 1530 HOURS 10-31-89 ~'9/1 1/0:3 TOTAL DEPTH Ol I . O0 EL APSED H OUR S 2.50 2.00 l.O0 t-O0 DA I LY DA I L Y AC cUMUL A TED JOB CC~ST MUD COST MUD COST 31.2'75 0 790287 I 562 3 OPERATION NU TRIP C i RC TSTE~OP I * O0 DRL 050 CIRC .50 OT HER 3.50 DRL .50 cIRC 1.50 TRIP 2. O0 TRIP 1. O0 OTHER 7. O0 DRL OPERATION DESCRIPTION · NIPPLE UP. DIVERTER SYSTEM. FUNCTI~ TEST SAME. PU ~HA AND TRIP IN HiE. TAG CEMENT AT 608. CIRCULATE AND CONDITION MUD. DUMP CEMENT AND COMTANINATED MUD OVERBOARD. TEST 20~ CASING AND ANNULAR PREVENTER TO 250 PSI FOR 30 MIN. ORIEL CEMENT AND FLOAT. SHOE AT 61~. CLEAN OUT TO OOOOO000000000000000000000000000000000000000000000 0000000~ CIRCULATE BOTTOMS LEAK OFF TEST. MAX. PRESS~E 250 prSI ~LED 8ACK TO 1~0 PSI IN 5 MIN. EQU. MUD WEIGHT 14 PPG. DRILL WI'TH ROTARY 8HA FRO~ 625--716~ CIRCULATE BOTTOMS UP. TOH.AND LAY DOWN 2 iTS DP 12 JTS H~DP AND S T AB. PECK-UP 8-1/~" DRILEX ~UD MOTOR 2 DEGREE ~EN'TSU8 AND TELECO N~D AND TIH. ORIENT MUO MOTOR AND ESTABLISH TOOL FACE. DIRECTIONAL DRILL WITH ~UD MOTOR FROM 89/11/04 TOTAL DA I LY DA [LY ACCUMULATED ACCUMULA 'rED DEPTH JO8 COST MUD COST JOB COST MUD COST 1410,00 34467 587 824754 16210 REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE 89/11/05 ELAPSED HOURS t6.50 1,50 2,0'0 3°00 t,O0 TOTAL DEPTH ! 920, O0 ELAPSED HOURS 7.00 OPERATION ORE TRIP .OTHER TRIP DRL OTHER DAILY JOaB COST OPERATION OESCR!PTION DRILL WITH MUD MOTOR AN~ 2 DEGREE ELINT SUB FRDM 716 TO 1392. MAKE A 80 DEGREE RIGHT HAND TURN FROM TO NS~W AND 8LILT ANGLE FROM 6.2 DEGREES TO 15e6 DEGREE, FINISHED O~T TURN WITH ~50 OF BU%LD SECTION WITH A ~55 HEADING. TR[P OUT ~[TH ~UD MOTOR. No TIGHT SPOTS, CHANGE OUT BHA, LAY DOWN ~UD MOTOR AND BENT SUB. PU 80 BU[LD[NG ASSY AND BIT · 5.~ TRiP IN WITH B[T ~5. WASH AND REiN THROUGH BRIDGES AT 6~3 AND 1250. NO FI~LL~ON BOTTOM. DR[LL[NG 1392 TO ~10 ~['TH 55 WOB AND 80 RPM 0~00 HR UPDATE DRILLING. AT 1600, BUILD[NG ANGLE AT 5 DE~EES PER ~00 FEET, REDUCING ~OB FRO~ 52K TO 20K IN "AN ATTEMPT TO REDUCE EXCESIVE 8U[LD RATE, HOLDING D[RECT[ON AT 555 DUR%NG BUILD. DEPTH ~OB SURVE~ DEPTH ANGLE DES 1392-1443 52 ,1.402 18.5 5 1'~63 21.5 1~3~1525 30 1525 25 5. ~ 1525--1600 20 1588 2~.8 1619 28.7' 2~9 PENATRATION RATE SLO~ED DOWN lO 23 FPH DAILY ACcu"ULATED ACCUMULATED MUD COST JOB COST MUD COST 2220 856206 18430 OPERATION 2,00 CI~C 3.00 TRIP .50 RFAM .~,00 D~L OPE. RATION DESCRIPTION ORIEL FROM 1411 TO 1658, AN. GEE BUILT AT A 5 DEGREES PER IOORATE, SEE REMARKS FROM 11-*--~9 REPORT , CIRCULATE AND PUMP A .HIGH. .VISCOSITY SIEEP. CIRCULATE. UN%IL THE CUTTINGS CLEARED TOH ~ITH BII ~5, NO TIGHT HOLE. LAY DOWN TOP STAB. AND PU UNDER G~UGE STABILIZE~ 15~. TRIP IN WITH 50 BUI'L~ING ASSY. TAG BRIDGE AT 1275 ~ASH AND ~EAM 1275 TD 1325. COAL SEA~ AT 1265, NO FILL ON DRILL AND SURVEY FROM ~65~ TO 1920, ANGLE BUILDING REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE C TOTAL DEPTH 3693-00 DA ! LY DA [ LY AC CUMULATED ACCUMULA TED JOB COST MUD COST JOB COST MUD COST 27986 5035 935861 33313 EL APSED HOURS OPERAT [ON 1 8, 50 DRL OPERATION DESCRIPTION MAINTAIN A BUILD RATE OF 0.5 DEGREES PER 100. l.O0 TRIP SHORT TRIP TO 2850. NO TIGHT SPOTS. HOLE IN GOOD CONDITION. TRIP GAS = 800 UNITS ON SHORT TRIP. 4,50 ORE DRILLING FRO~4 3624 TO 3693. 8g/Ii/Og TOTAL DAILY DEPTH JOB COST 3967,00 27986 ELAPSED HOURS OPERATION 14,50 ORE 1.50 CIRC 2.00 TRiP 1.50 CUT DE t.50 TRIP 3.00 R~AN DA [ L¥ ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 3673 9'63841. 36986 OPERATION DESCR!PTION DRILL TO 3967. ~QP L[SS THAN 10 FPH. STOP TO RUN 13'3/8" SURFACE CASING. S~VEY. PUMP HIGH VIS SWEEP AND CIRCULATE ~OTTOMS SHORT TRIP TO CA.$I H,O'LE IN GOOD~ SHAPE WITH NO TIGHT SPOTS. SLZP AND CU~ OR[,,LLING T~[P IN HOLE..IT LA~V DOWN 5 S[:NGLES. REAM a~5O TO eOf~OM - tO FILL, 89/It/tO TOTAL DALLY DAILY 'ACCUMULATED AC'CUMULATED DEPTH JOB COST MUD COST ~OB COST MUD COST 3967,00 27986 1205 991533 38191 ELAPSED HOUR S OPER AT ION 2.00 CIRC OPERATION DESCRIPTION CIRCULATE AHD CONDITION HOLE AFTER WASHING AND REPORT DATE: 0~1-/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERATION l.O0 TOTAL DEPTH 3967. O0 OT HER OAILY JOB COST t25030 89/11/t2 EL APSED HOURS 9.00 OPERA T ION OTHER 89/l I/i ,3 .3.00 6.~0 OPERAT [ ON DESCRIPTION THE *ATER VOLU~E THEN FELL OFF AS WELL FLOWED iN HEADS.. SHUT ~ELL IN FOR ~5 MINUTES. PRESSURE BUILT UP TO 1,8 PS[ AND ~AS BUiLDiNG SLOMLY AT THiS POINT. BLED PRESSURE OFF WiTH A LARGE A~OUNT OF GAS. OPEN BOP. PiCK UP ON 13 3/8w CASING FRON 150000 · TO tgooooe NO STRETCH IN PIPE INDICATING THAT CEMENT ~AS NEAR SURFACE. NOTE'. ~LL NOT ~E ABLE TO ENERGIZE SEALS ON 20a BY t3 3/8" CASING SLIP5 SLACK OFF ON CASING AND REMOVE CEMENT HEAD. PU AND RUN 1~ TBG. C~LD NOT ~ORK PAST CASING C~NTRAL1ZER ~T 71. NO CEMENT TO THIS POINT. P,[PE IS APPARENTLY FREE TO THiS POINT. 5 · 50 TOTAL DEPTH ~?o O0 OTHER OTHER DA I L Y AC CUMULA TED ACCUMULATED MUD COST JOB COST MUD ,COST 4.24- ! 205563 4, {. 045 NU OPERATION DEsCR!PTION MONITOR I~ELL. FLOW DECREASED' TO 8-9 8PH AND ST AB ! L I ZED,. iNSTALL ~20# X i3 3/8# CASING HANGER: OPEN ANNULUAR PREVENTER NIPPLE DOWN AND PU STACK. SET SLIPS ~H[LE ~ELL,~WAS FLO~INGJ ~ONITO~ GAS LEVELS IHiLE IORKiNG. NOTE: UNABLE [O~ ENERGIZE SLIP SEALS BECAUSE TBERE WAS NO STRETCH IN 13-3/8~ CASING,. ~AKE ROUGH CDT ON 13 ]/8" CASING WHILE DIVERTING FLOi OUT 2" OUTLETS ON 20" CASING SPOOL. NIPPLE DO~N 20 ANN~,AR PREVENTER AN~r 20 NIPPLE UP 13 5/8~ 3000~ X 21 ~/4" 2000 CASING SPOOL. NOTE: UN~BLE TO TEST CASING SPOOL BECAUSE THE CASING HANGER WAS NOT ENERG]ZED. ~NNULAR PRESSURE BU'[LT UP TO 2~0 PSI. "SN,iFFED" FOR GAS AROUND ',~ELL HEAD AND NO GAS WAS FOUND INDICATING THAT THE SECONDARY SEALS WERE HOLDING. DALLY JOB COS T 23847 DA [ L V AccUMuL A'rED MUD COST JOB COST 1552 1229~10 AC'co"UL A TED MUD COST ~2597 REPORT DATE: 04/23/90 USER DEF!NED REPORT PAGE ELAPSEO HOURS OPERATION I .00 TRIP TOTAL DAILY DEPTH JOB COST 4 3300 O0 26408 ELAPSED HOURS OPERAT ION I .50 TRIP ! ~ 50 OTHER 2.00 OU 3.00 ~RIP 6.50 RIGREP 9.50 DRL TOTAL DAILY DEPTH JOB COST 4 740. O0 3547? ELAPSED HOURS OPERATION 1~.00 ORL l.O0 CIRC · 50 SURVEY .50 OTHER 2,00 TRIP 2 , 00 R I GRIP OPERATION DESCRIPTION TRIP OUT OF HOLE AND INSTALL DRILL PIPE RUBBERS ON EVERY OTHER JOINT, ' DA I L Y ACCU~UL A T ED AC CUMULATE MUD COST JOB COST MUD COST OPERATION DESCRIPTION TRIP OUT AND INSTALL DRILL PIPE RI~BBERS ON EVERY OTHER JOINT. INSTALL ~EAR BUSHING IN 11--3/8" SPOOL. PICK UP NB-30-30 STABILIZED BOT~OMH~,E ASSEMBLY AND TEST TI'ELCO MWD. TRIP IN :H~E ~0 13--3/8e CASING SHOE. CIRCULATE AND WORK ON WATER SPEAR FO~ HYDRONATIC ON ~AWWORKS. RE~LACEO:WI, TH ~ARTS RG88ED FRO~ DRILLING RiG ON ,PLATFORM BA,KE:R 'AND FLOIN TO BR~CE BY HELI COPIER · DRILLING 12.25" HOLE FROH 3~77 TO ~330 gllH 8HA DESIGNED FOR SLIGHT DA I LY AC CU~L ATED ACCUI~IUL AT ED MUD COST JOB .COST MUD COST 3228 13481 60 5248 l OPERAT I ON ,DE SC R I PT I ON DRILLING FROM 4330 TO 4-748 - UNABLE TO STOP ~UILDING ANGLE WITH THIS BHA ~Y VARYING CIRC BOTTOMS ~ PRIOR TO TRIPPING OUT DROPPED SURVEY PRIOR TO KELLY HUNG UP ON SAVER-SUB RUBBER IN RAT ~,LE TRIP OUT OF HOLE - REMOVE D.P. RUBBERS FROM STANDS OF DRILL PIPE REPAIR ROTARY TORQUE INDICATOR CYLINDER REPORT DATE: 04/23/90 USER OEFINEO REPORT PAGE ELAPSED HOURS OPERA T I ON .,.. am,, ,mm-- *mm. .a~e mm, o 5 0 OTHER I .50 TR[P I · 00 DEL l, O0 OTHER 4,00 DRL 1,50 CIRC .50 OTHER 3,00 TRIP 2.00 TRIP .50 RIGREP .50 TRIP DRL OPERATION DESCRIPTION CHANGE OUT SHAKER SCREENS TO 3--1%0 S AND 84--110--110. TRIP IN H~E WITH TIGHT SPOTS AT 4607 5050 5i60 e REAM 5020 -5090 ~ITH NO FILL ON BOTTOM, DRILL FROM 5176 --519~ AND SURVEY AT LOSING ~UD OVER SHAKER~ DUE TO EXC~SIV~ COAL CIRCULATE UNTIL CLEAN*, DRILL FROM 5~9~ -5255 ADJUSTING ~EIGHT AND TO INITIATE HOLD/DROP WITH PACKED ~HAe C~ RC~ATE BOTTOMS DROP $~VEY- TRIP OUT OF HOLE FOR PENDULUM BHA, .LAY DOWN N~ STABILIZER A~ SHORT MO~L X P~CK-UP ~NEL NO HOLE PROBLEMS O'R TIGHT SPOTS ON TOH, TIH. REPAIR CATHEAD VALe. TX H. 0400 HR UPDATE -DRILLING AHEAD ~ ~3~0 89/11/1g T 0 TAL DA I L Y DEPTH JOB COST .~ ~ 5500. O0 25993 DA I LY ACCUMUL A T ED ACCUMULATED MUD COST JOr~E~ COST MUD COST 10.38 14310 ~7 69264 EL APSED HOURS OPERA T I ON DSO TRIP 6.00 DRL I . 50 CIRC .50 TRIP 3.50 TRIP I . 50 PU 2.00 RIGREP 2.00 TRIP 2.0.0 REA M 4.50 DRL OPERATION DESCRIPTION TIH X TAGGED LEDGE ~ 5104 . DRILLED FR:OM 5254 - 5410 W/ SURVEYS ~ 5363 5395 E, 5410 CIRCULATE 80TTONS UP & PUMP PI,LL. TOH TO 5291 X KELLY UP E. SURVEY i 5408 , TOH W/ TIGHT SPOT 4. m%16! X LAY DOWN 9 JTS HWDP, CHANGED TO PACKED BHA X TRIP IN W/ 8HA ~ P/U 9 JTS DR I LLP I PE. REPAIR MAKE UP CATHEAD. TRIP IN . REAM F/ 5255 TO 5410 W/ 5000 LBS. NOB, OR'ltL FROM 54i0 TO 5500 ~ SURVEY W/ MHD. 89/11/20 TOTAL DAILY DEPTH JOB COST ~052.00 32846 DAILY ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST I 734 1463893 70 998 REPORT DATE: 0~/2J/90 USER DEF!NED REPORT PAGE ELAPSED HOURS OPERATION 24,00 DRL OPERATION DESCRIPTION DRILL FROM 5500 -6052 WITH PACKED BHA. MONITORING INCLINATION/DIRECTION WITH 60 -90 MWD SURVEYS. 89/11/21 TOTAL DAILY DEPTH JOB COST 6519. O0 24504 EL APSED HOURS OPERA T I ON · 50 DRL l.O0 CIRC 1.00 TRIP 1.50 TRIP 20.00 DRL DAILY ACCUNULATED ACCUMULATED MUD COST JOB COST MUD COST 4132 1488397 75130 OPERATION DESCRIPTION DRILL FROM 6052 -6063 . CIRCULATE BOTTOMS A~ PUMP SHORT TRIP 22 STANDS TO 13 3/8m~ CASING SHOE WITH ~0--60 K LBS. DRAG :~ AND DO~N. TIGHT SPOT g ~'736 W/ lOOK LBS. ON TOH X CLEAN ON T IHa TRIP IN TO BOTTOM ~/ BOBBLES ~ 4090 TAGGED COAL 'BRIDGE ~ 5~2 ~ KELLY UP AND ~ASH~REA~ THRU WITH NO PROBLEMS. TRIP IN TO ~OTTOM REAM 30 · ~ NO FILL. DRILL F~OM 6063 - 6S[~ ~[TH 60 -GO ~D VARYING ~OB FROM ~O--$OK~ AND RP~ FRO~ 70-~0 IN AN ATTEMPT TO SLOW DROP RATE TO 0.15 DEGREES/lO0 89/11/22 TOTAL DAILY DEPTH JOB. COST 66'74. O0 24504 ELAPSED HOUR S OPERA T I ON 4. O0 DRL, I .50 TRIP ~.00 DRL .50 SURVEY 3, O0 TR I P 1.00 RIGREP DA I LY ACCUMUL ATE D A CCU~ULAT ED MUD COST JOB COST MUD, COST I g31 1512901 7'~ 06 t OPERATION DESCRIPTION DRILL FROM 6519 - 66~9 SHORT TRIP [? STANDS TO 5000 WITH NO' TIGHT SPOTS. REAM 30 TO BOTTON WITH NO FILL. DRILL FROM 66I~ - 6674 DROP SURVEY AND PUMP PI LL. TRIP OUT OF THE HOLE WiTH VERY HIGH 30--$0 KNOTS WINDS AND TIGHT TOOL JOINTS. REPAIR BREAKOUT LINE O'N CATHEAD. REPORT DALE' USER DEFINED REPORT PAGE EL APSED HOURS OPERA T I ON 3.00 TRIP 2.00 TSTBOP OPERATION DESCRIPTION FINISH TRIP OUT OF HOLE X LAY DO~N 6 JOINTS OF DR ILLPI PE AND PICK UP TEST JOINT AND PULL BOWL PROTECTOR, TEST BOP X RAMS AND VALVES TO 300 ~ 5000 PSI X ANNULAR 300 & 2000 PSI. 0A I LY: DA, I LY AC CUMULATED ACCUMULATED JOB COST NUD COST JOB COST MUD COST TOTAL DEPTH 6957.00 ELAPSED HOURS ,50 3.00 OPERATION TSTBOP TRIP 1, O0 CUT DL · 50 TR I P - 50 OTHER 2.00 TRIP 16,50 DRL OPERATION DESCRIPTION INSTALL 'WEAR BUSHING AND LAY DO~N TEST JOINT LAY DOWN 12 MONEL AND PICK UP 9 SHOCK SUB, MAKE ~ NEW BIT AND TIH TO CASING SHOE SLOW DUE TO HIGH W ! NOS, CUT 60 O:F DRILLING LINE, 'TIH T'O .~8~0 TEST TELECO M~'D FOR ~AGNETIC INTERFERENCE DUE TO STEEL SHOCK SUB BELOW SENSOR- 2.5 DE~EES RIGHT CORRECTION AT 53.5 DEGREES INCLINATION. TIN AND REAM 30 TO BDT'TOM ~ITH NO FILL. DRILL FROM 667~ - 6957 ~'ITH MWD SURVEYS EVERY 30 89/11/24 TOTAL DAILY DAILY ACCUMULATED ACCUM~ATED DEPTH JOB COST MUD COST JOB COST MUD COST . 7 22'5 · O0 2 ~1.;7,24 2'776 1 55951 '% 8'0702 EL APSEO H OUR $ O P E ,R A T I 0 N ! 0.5,0 DRL .50 CIRC. 4.50 TRIP 3.00 TRIP OPERATION DESCRIPTION DRILL FROM 695'7 -- 7145 WIT'H MWD SURVEYS, CIRCULATE HOLE AND MiX AND PUMP SLUG, TOH FOR BHA CHANGE X TIGHT SPOTS AT 6015 4920 47~0 AND ~6.c)5 X HAD TO ~ORK THROUGH A TIGHT SPOT FROM 4153 -- 4061 X 6 COAL AT 4094 PICK UP NEW BIT AND 2~,~ MDN~L DC AND ADD TO R~PORT DATE: USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 5.50 DRL OPERATION DESCRIPTION BETWEEN NB STAB AND MIDDLE STAB TO BUILD A 41 BELLY. TIH AND TEST NWD AT 4775 X REAM 30 TO BOTTOM AS A PRECAUTION. DRILL FROM 7145 - 72'25 ~ITH 55K~ AND Z5 RPM TO BREAK/SLOW DROPPING TREND. TOTAL OAI L Y DAILY ACCU.NUL ATED ACCUMULATED DEPTH JOB COST ~UD COST JOB COST MUD COST 74'68,00 . 22523 I 329 !582037 82031 EL APSED HOURS OPERA ! ION 3.00 ,ORE .50 SUR VEY 1 3.50 O RL .50 CI RC 4.00 TRIP 2.00 , LB OPERATION DESCRIPTION DRILL FROM' 7225 --?276 WITH MWD SURVEYS AND THE FOLLOWING WOB & RP~ COMBINATIONS AND RESULTS: "INTERVAL WOB RPM SURVEY BUILD 7236--7268 50 80 7241 35,8 355.0 CHECK ~WD SURVEYS TO CONF.IR~ BUILDING TREND, DRILL FRO~. 72~6 ~7~86 ~ITH ~D SURVEYS AND THE VARIOUS WOB & RP~ COMBINATIONS AND RESULTS: INTERVAL ~OB RP~ S~VEY BUILD 7268-7331 3'0 100 72'~3 35.8 355.3 HOLD 730~ 35~g 355~0 0.32/tO0 7335 35.9' 355" 3 H~D 733t--'7357 50 80 7366 36.~ 355.7 0.65/I00 7357--'7~68 40 % O0 '7:386 36, · 355,7 %, 5/100 DEC-IS[ON ~AS ~AD~ TO TRIP FOR NEW BHA DUE TO UNACCEPTA:B~LE ROD S WITH THE 30K~/100 RP~ CONBINATION AND;'THE PRESENT INCLINATION WAS EQUAL TO THE PRO~ECTED PROGRAM. MIX .'AND PUMP SLUG,,, TOH WITH TIGHT SPOTS 30-K~ OVER NORMAL mSTEADY~ DRAG AT 5030 4755 4530 AND ~190 · CORRELATION, OF TIGHT SPOTS TO MUD LOG SHOWS MAINLY SAND STRINGERS. SUSPECT FILTER CA~E BUILD--UP IN POROUS SANDS HAVE HAD SOME SEEPAGE ON TRIPS. LAY DOWN 28.~ NONEL DC AND DICK-UP 1.1'B SHORT MDNEL DC IN ITS PLACE BETWEEN THE NB STABILIZER AND MIDDLE STABILIZER. ALSO SWITCH TOP STABILIZER AND MIDDLE STABILIZER DUE TO MIDDLE STABILIZER BEING REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE C ELAPSEO HOURS OPERATION .50 TRIP OPERAT[ ON DESCRIPTION I~z~# UNDER GAUGE. HAD TO CHANGE OUT TOP TWO MONEL DC S t~[TH GALLED FACES ON THE BOX AND PIN. T[H WITH NE~ 4! PACKED BHA AND NEW FICE CENTER JET/EXTENDED NOZZLE TOTAL DAILY . DEPTH JO8 COST 78 ~ Z',. OD 2370 ~ ELAPSED HOURS OPERAT [ ON .50 T'R I P .50 OT H E R I .50 TRIP l. 5O DRL 2.50, RIGREP l 7.50 DEL 89/11/26 DAILY ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 1500 1605745 83531 OPERATION DESCRIPTION TRIP IN HOLE TO SHOE SLIP DRILLI~ LINE X FiLL PIPE X RESET DUAL-O-MATIC TIH 'TO BOTTOM X 'REAM 40 DRILL FROM 7468 --7497 ~'ITH 30 MWD SURVEYS. ~tORK ON MARTIN DECKER WEIGHT INDICATOR AND BLEED DOWN SAME - TRASH IN LINES* DRILL FROM ~497 -7812 ,W.'ITH THE30 MWD SURVEYS AND THE ~FoLLO=~ING WOB/RPM COMBINATIONS AND RESULTS: INTERVAL WOB RPM SURVEY DROP 7~68'7528 45 90 7489 36.7 356 0.83/100 7519 3~.3 356 1.30'/t00 7528~7558 50 O0 7551 36.3 356 HOLD 7558~7685 '55 75 7573 36 · 3 356 HOLD 7604, 36.1 355~3 0~65/%00 7636 35.8 356 0.~4/100 7668 35-7 356 0.31/1 7685-7717 60 75 7699 35.3 356,3 1.29/100 77 t'7~TT4'8 50' 75 7731 35.2 356 0-31/i00 7~48~7780, 55 80, 7?63 34,9 35'5,7 0,94/10,0 7780-7843 55 75 7794 34.4 356.4 1.61/100 TOTAL DAILY DEPTH 'JOB COST 8123,00 23564 ELAPSED HOURS OPERA T I ON 8.00 DRL D A I L Y A C CUM U L A 1' E D A C C IJ::MUL AT E D MUD COST JOB COST MUD COST 1906 1629309 85437 OPERATION DESCRIPTION DRILL FROM 7812 -7998 WITH 30 M~D SURVEYS AND 55K# '$A..~ABllS O~N 0£ FtlI~ i~B~8- 0918~0B:1 IS31 '30.MS gNISV3 .g/E-E1 IV ]did 99I~ 'SUAOH Ol 8N l~O ~gN~H3 '~AO~I~8 S~N'Ilin9 HiI~ ~80l ~d~ X 000~ ON~ OgI~ OS~ Ot~ IV SiOdS IHgll X 9VaO ONV SNOII~31V5 ~3~0.~ Ol ]~0 006~ ~01~8 S~88R~ ~dId~lI~O ~AO~.~ ONV, HOi 'DA]S d~nd ONV 3tV1~3~.13 NO Ild I~S'~O NO IlV~dO OS"O l dl~l, 0S°6 3~13 OS' ~0 OS'I dlBl 0~'I dl~l O0'Z ~I~ 00'! NOll¥~]dO $ ~noH (]9Sd¥ ]gVd REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE TOTAL DAILY DALLY ACCUMULATED ACCUMULATED DEPTH JO8 COST MUD COST JOB COST MUD COST 8510. O0 27723 2a69 1660832 91706 ELAPSED H~RS OPERATION t 3 ~ 00 DRL .50 CIRC 3~50 ~RIP I,O0 CUT DL ¢.00 RIGREP 2.00 T R I P OPERATION DESCRIPTION ORIEL FROM 8282 - 8510 N/ 30 M~D SURVEYS CIRCULATE AND PUMP SLUG. SHORT TRIP :TO 13-3/8~ CASING SHOE. LAY DO~N 60 JOINTS t9.5~ X95 ORILLPiPE. TIGHT SPOTS AT 5805 CUT 90 DRILLING LINE X SLIP CHANGE OUT BRAKE PADS ON DRUM X ~R[LLER S SIDE ~ROKE TIH WITH'PIPE FRO~ DERRICK X PICK-UP 25e6~ Xg~ DRiLLPiPE AND RUBBER SAME. 8'9/! !/3 O, TOTAL D'AI LY DA I LY AC CUMULATED ACCUMULATED DEPTH JO8 COST MUD COST JOB COST MUD COST 88 07.00 234144 ! 8'73 168~2 76 93579 ELAPSED HOURS OPERA T I ON 1 o 50 PU' % . 00 RI GREP 2 ! .50 DRL OPERATION DESCRIPTION PICK U,P 25.6~/FT. REAM ~5 TO BOTTOM- NO FILL ADJUST DRU~t BRAKES. DRILL FROM 8510 -8807 WITH 30 M~D SURVEYS AND 40--45K~' WO8 AND 80--90 RPM, 89/! 2/0 ! TOTAL DA ILY DAILY ACCUMULATED ACCUMULATED DEPTH .JoB COST MUD COST JO~ COST MUD COST 8968. O0 3 3202 0 ! 7'17478 ':)3,579 ELAPSED HOURS OPERATION lO.O0 DRL OPERATION DESCRIPTION DRILLING FROM 8807 -8968, W/ 30 MWD SURVEYS REPORT DATE: 04/23790 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 2.50 CIRC 3.50 TRIP ,50 OTHER 1,50 TRIP 3.00 TSTBOP 2.00 OTHER t,O0 PU OPERAT [ ON DESCRIPTION CIRCULATE BOTTOMS UP - PU~P SLUG TOH FOR NEW BIT AND BHA X TIGHT SPOTS AT 4650 4415 AND 4380 . UNLOCK BLOCKS BELOW 'TIGHT SPOTS AT t3-]/8" 'SHOE AND PULL STABILIZERS THROUGH SHOE WITH NO PROBLEm. PICK UP KELL~ AT H~DP AND BREAK SAME. ,FINISH TOH AND LAY DO~N 30 ~ONEL PULL ~EAR BUSHING AND ~EST BOP S X H~DR~L T0 300 20~0~ ALL RAMS VALVES AND CHOKE ~AN~FOLD T0 300-3000~ X EVERYTHING TESTED OK X INSTALL WEAR BUSH~ NG. CHANGE OUT KELLYS, ' MAKE'UP NE~ PACKED Q BHA ANO TOTAL DAILY DEPTH JOB COST 918'7.00 25000 EL&PSED HOURS OPERATION 1,00 OTHER 1.50 TRIP 1.00 CUT OL 2.00 TRIP .SO REAM I8.0.0 DRL 89/12/02 DAILY ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 1382 17.2~'78 9~961 OPERAT.I ON DESCRIPTION DALLY COST=$25 000 CHANGED BHA TO 9 PACKED ASSY TRIP IN THE HOLE. SL~P ~ CUT 400 OF DRILLING LINE FINISHED TRIPPING TN THiE HOLE WA'SM ~ REAM ]O TO MTTOM - NO F ILLll DRILLING FROM 8968 TO 9187 W/ 30 MWD SURVEYS. TOT AL D A l L Y DA ILY AC CUMUL'A TED A cC UM~UL ATE O DEPTH JOB COS'T ~UD COST JOB COST MUD COST' 89/t2/03 9~89. O0 2,4112 28~9 1766590 97810 ELAPSED HOURS OPERATION 8.50 DRL .50 CIRC OPERATION DESCRIPTION DALLY COSTS= $2~ II2 DRILLING F/~IS?-9]00 1/30 ~D SURVEYS. CIRCULATED CUTTINGS UP HOLE BEFORE SHORT TRIP. ( REP[IRT DATE USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 2.00 TRIP 13.00 DRL 89/12/04 T 0 TAL L~A [ L Y DEPTH JO8 COST 9660. O0 28'~95 ELAPSED HOURS OPERAT ION [ I. O0 DRL .50 C IRC 2,00 TRIP OPERATION DESCRIPTION SHORT TRIP tO STANDS. PULLED 70-60K OVER DRAG WEIGHT B 893! & 8510 CORRESPONDS TO COALS ON HUD LOG . DID NOT SEE TIGHT SPOTS -ON ,.WAY BACK TO BOTTOM. DRILLING F/ 9300 -9~89 ~/ 30 MWD SURVEYS. 10.50 DRL DAILY ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 72 ! 6 1795085 ! 05026 OPERATION DESCRIPTION DAILY COST=S28 495 DRI'LLING F/ 9~8q - 9577 30 M~O SURVEYS. CIRCULATED CUTTINGS UP HOLE 9EFORE SHORT TRIP,. SHOR'T TR~IP 1~ STANDS;, T'~*GHT AT 9']ZO.. AND 9335 . DID NOT SEE T]GHT SPOT,S GN. T]H. REA~ =~0. TO BOTTOM. DRILLING FROM 9577 TO 9660 WITH 30 ~WD SURVEYS. 89/12/05 TOT AL DA I LY DEPTH .JOB COST ~795o00 25508 ELAPSED HoURs OPERA T ION 9. O0 DRL l o 00 R I GREP :3.50 DRL I .50 C .IRC Z~. O0 TRIP' ,.50 OTHER 1,50 TRIP 2. O0 PU D A I L Y ACCU ~4ULAT E D A CCUMULAT MUD COST JOB COST MUD COST 3676 % 820593 l 087.0 2 OPERAT ION DESCRIPTION DRILLING FROM 9660' TO 97~+0 WI, TH 30 M~D SURVEYS WORK. ON NO,. 2 ,MUD PUMP DRILLING ,FROM 97~0 TO' 9'795 WITH 30 MWD SURVEYS. CIRCULATE A~ DROP SINGLE SHOT CHECK SURVEY. PUMP 5LUG AND TRIP OUT FOR~ ~UD MOTOR AND ~ENT SU~ TO STEER T~ WELL ~ACK TO NW. TIGHT SPOTS AT 5837 5797 4887 ~574 AND ~300 ON TR'IP OUT. HELO ~OP AND ABANDON PLATFORM DRILL.. FINISH TRIP OUT OF HOLE. RETRIEVE SURVEY. LAY DOWN STABILIZERS AND: SHOCK PICK UP BIT MUD MOTOR 1.5 DEGREE BENT SUB AND MAKE UP BHA. TRIP IN HOLE. T~:S'T NUO MOTOR AND REPORT DATE: 0¢/23/90 USER DEFINED REPORT PAGE 89/12/09 ELAPSEO HOURS I .50 2.50 .50 2.00 1.00 I .00 1.50 5.50 OPERAT ION LO TRIP CUT DL TRIP DRL R i GIREp DRL OPERATION DESCRIPTION LAY DOWN MUD MOTOR AND BENT SUB AND PICK UP BIT SHOCK S~ AND SHORT MONEL COLLAR. TRIP IN HOLE lO CASING SHOE. SLIP AND CUT ~5 OF DRILLING LINE. SET CROWN--O--MAIIC AND FiLL PIPE- iR iP tN HIE TO 9~95 · REAM MUD MOTOR RUN FROM 9195 TO 9875 ORE:EL AHEAD'FROM 9875 TO 9883 . REPAIR BROKEN LINK oN ROTARY TABLE CHAIN- ~%LL FROM 9~B3 TO ~35 WITH 30 ~WD SURVEYS. TOIAL DAILY DEPTH JOB COST 10089.00 ~0702 ELAPSED HODRS OPERATION 15,00 .50 CIRC ~.00 TRIP I, 50 TR I P .50 REAN 2.50 TRIP DA I LY ACCUMU'L ATED ACCUMUL A TED MUD COST JOB COST MUD COST 2504 192070? 11761 I OPERATION DESCRIPTION DAILY COST = $~0 702 CU'MI,. COST = $1 97'3 501 DRILL AHEAD FROM 993t TO 1008'9 W'ITH 30 MWO SURVEYS. C!RCULATE AND PU~IP SL~ FOR SHORT TRIP. TRiP out TO SHOE. TIGHT SPOTS AT 9929 9890 9855 7tO0 6874 AND ~650 TOP STABILIIZER DEPTHS . P~L UP TO ASO000 LBS. OFF BOTTOM. LAY DOWN 30 JOINTS OF t9-5 LB. DRILL PIPE. TRiP tN HOLE AND PICK UP 25-6 LB- DRILL PIPE. HI'T BRIDGE AT 5780 PICK UP KELLY AND REAM THROUGH BRIDGE AT 5780 ., F~'NISH PICKING UP 25,6 LB, DRILL PIPE AND TRIP HOLE TO 9~2 , OT AL DA I LY DA I L Y ACC~MUL ATED ACCUMULATED OEPTft JOB COST MUD COST JOB COST MOO COST 300~ O0 I 7922 2916 1938629 12052 7 EL APSED H~RS OPERA T ION 2, O0 RE AN OPERAT ION DESCRIPTION REAM FROM 9822 TO 10089 TIGHT ON SHORT TRIP REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE C, EL APSED HOURS OPERAT ION I 4.50 DRL 1o00 TRIP 6.50 DRL OPERATION DESCRIPTION DRILL FROM 10089 TO 10237 WITH 30 MWD SURVEYS. SHORT WIPER TRIP UP TO 9150 , TIGHT SPOT AT 9960 REAM 45 TO BOTTOM. NO FILL. DRILL FROM 10237 TO 10300 WITH 30 MWD SURVEYS, 89/12/10 TOTAL DAILY DEPTH JOB COST 10510,00 34632 ELAPSED HOURS OPERATION 10.00 PRE 1,00 TRIP 1.00 REAM ~2.00 DRL DA I L Y AC CUMUL A TED AC CUMULA TED MUD COST JOB .COST MUD COST 2236 1973261 122763 OPERATION DESCRIPTION DRILLING FROM 10300 TO I0~12 WITH 30 MWD SURVEYS, SHORT TRIP TO 9385 . TIGHT AT 10275 AND 10170 REAN FROM 10285 TO BOTTO'~, NO FILL. DRILL FROM tO~12 TO 10510 WITH 30 MWD SURVEYS. 8'9/12/1 t TDTAL DA I LY DEPTH JOB COST lO 645., O0 24'704 DA I L Y AC CUMUL ATE D AC CU~ULA TED MUD coST JOB COST MUD COST 2'70~ ! 997965 125467 EL APSEO HOURS OPERA T ION 10.00 DRL 3,00 CIRC 1,50 RZGREP · 50 SURVEY 4,00 TRIP 1o00 CUT DL 2.50 TRIP 1.50 REAM OPERATION DESCRIPTION DRILLING FROM 105%0 TO 10645 DRILLED IN SHALE/HARD $ILTSTONE 10619 'TO 10645 AT EIGHT TO TEN FT/HR PLAN TO SET THE 9 5/8It CASING AT THIS DEP"TH.' PUMP SWEEP AND CIRC~ATE HOLE FOR ~IPER TRIP. REPLACE BROKEN LOW DRUM CHAIN. SURVEY ON BOTTOM AND PUMP SLUG, TRIP OUT lO CASING SHOE., TIGHT AT 7052 6848 AND 6817 KELLY UP AND WORK OUT * SINGLES AT 6879 COT DRILLING LINE ~0 A~O SLIP 60 TRIP IN HOLE TO 10332 REA~ FRO~ 10332 TO 10645 . NO FILL. REPORT DATE: 04/23/g0 USER DEFINED REPORT PAGE C ~9/12/12 ~9/12/13 TOTAL DAILY DEPTH JO0 COST 10645. O0 24904 ELAPSED HOURS OPERAT [ON 4.00 CIRC 6.00 TRIP 1.00 LD 1o00 RUTOOL 12.00 LOG DA [ L Y ACCUMUL A TED ACCUNULA TEO MUO COST JOB COST ~UD COST 2195 2022869 127662 OPERAT I ON ,DE SCA IPT I ON PUNP Hi-VIS S~EEP. CIRCULATE AND CONDITION HOLE FOR LOGS. TRIP OUT STRAP OUT FOR LOGS., TIGHT AT 7938 1834, 7527 6963 67'l AND 4935 . LAY DOWN, 2 IqONELS 3, STABILIZERS ~O SHOCK $:gB SHORT MONEL AND BIT. RIG UP WESTERN ATLAS LOGGERS,~ RUN IN HOLE WITH SP--DIL. HAD TROUBLE WORKING TOOL DO~N HOLE FROM 5100 TO 5500. LOG OUT FRO~ 10608 LOGGER S DEPTH TO SURFACE CASING. PRO~LEN LOGGER S DEPTH ~EING I~ORRECT 3;O~O SHORTER THAN D~RILL PIPE STRAPS RUN IN HOLE ~[TH FDC--CNL AND C~ULD NOT ~O'RK PAS~ 5t00 BEFORE lOOL FAILED. PULL OUT AND CHANGE OUT TOOL AND ~OD LENGTH FOR NORE WEIGHT AND FLEXIBI~L[T~. RUN IN WITH FDC-CNL. HAD T~OU~LE ~ORK[N6 'TOOL DO~N HOLE FRO~ ~aoe -53oo AND 7170 . SCi DO~N AT 1059'5~' A~B PULLED OP TO NAXI NUN LINE TENS[ON. DID, NOT,~A[~E~PT TO WORK ~ADIOACT[VE SOURCE TOOL A,N~ DEEPER. LOG OUT FRON 10595 LOGGER S DEPTH . TOTAL DAILY DEPTH JOB COST 106t45. O0 6181 l EL APSEO HOURS OPERAT TON ~, O0 LOG I. 00 ROTOOL 2.00 PU I . O0 ~I GS'E~ 2.50 TR[P O~[ LY AC CU~UL ATED ACCUM~J~A TED NUD COST JO~ COST ~go COST 56,4 2084680 128226 OPERAT ION DESCRIPTION FINISH LOGGING OUT aJITH FOC-CNL. RIG DOWN ~ESTERN ATLAS LOGGERS. PICK UP BHA FOR WIPER TRIP AND TRIP IN TO 13--3,/8a CASING SHOE. SLIP 45 DRILLING LINE. CHANGE OUT SAVER SUB. TRIP IN HOLEi TO CONDITION FDR g-5/8# CASImG. REPORT OATE: 04/25/90 USER DEF'[NED REPORT P AGE C, C ELAPSED HOUR $ OPERA T ION -- ~mm. -- ,,m, mm, ,m,m. ,,,,,,,. .mm, ,~m,,, ¢.O0 CSGCMT 7. O0 ND OPERATION DESCRIPTION ....................................... ;--;-[ ........... CIRCULATE ~ WORK CASING 500K TO 70K N M V t4ENT OR'- CHANGE. SHUT DOWN ALL RIG ENGINES EXCEPT FOR ONE MUD PUMP FROM %i00 TO 1300 HOURS DUE TO V~CANIC ASH FALLING FRO~ ERUPTION OF MT. REDOUBT. INST'~L,L CEMENT HEAD AND CIRCe BATCH MiX 100 BBLS ~ · A[L CEMEN~ PRESSURE TEStaT L[~S PUMP ~0 BBL WATER 5PA~ER 20 '-BBL5 CW--IOO P~EFLUSH DROP BOTTO~ PLUG ~IX A~D PU~P 139 SX ~AS5 G LEAD WITH ~ GEL 0.~% 065 0*25,% 0t33 FOLLOWED BY 700 SX CLASS G TAIL WITH 0.4~ 0133 AND Oe2~ 046 DR'OP T~ PLUG AND DISPLACE ~[TH 55~ BBLS OF NUD BU~P PL~ AT 1653 HOURS W[TH 800PS[ 300 ~OVER FCP B~E:~ED BACK 2 BBLS AND FLOATS HELD R~G DOW~N CENENTERS. NIPPLE DO~N STACK AND PECK UP 5~T 9-5/~w CASING SLIPS CUT LANDING JOINT AND STU~ R~MOVE 4 X--O SPOOL N[PPL~ UP TUBING HANGER SPOOL AND PACK-OFF T~ST SAME TO 2000 PSI - OK 89/12/16 TOTAL DAILY DA ILY DEPTH JOB COST MUD COST 10645. O0 268262 880 AC'CUMUL A TED ACCUMULATE D JOB COST MUD COST 2456'677 t 3225 ! EL APS ED HOURS OPERA T ,ION 4.. 50 NU 1. O0 OTHER 3. O0 TST EH3P 2.00 OTHER 3.50 TRIP .50 OTHER OPERA TI ON DESCRIPTION = ............................. INSTALL W'ING VALVES & lO"5000 PSI HANGER SPOOL. NIPPLE UP BOP STACK FLDWLINE CHOKE LINE ~ CHANGE TO 5~ RA~ ~LOCKS. PICK UP TEST JOIN~ ~REAK OUT ~OCT ~ "CA~ON~ TEST TEST 8OPE - ALL RAMS VALVES CHOKE ~ANIF~D CHOKE LINE ~ KILL LINE TO 500 PSI ~ 3000 PSI. ANNULAR PREVENTER TO 500' PSI ~ 2000 PSI. OKi.-INSTALL WEAR BUSH [ NG- SH'~T DO'~N RIG AIR MODIFY PIPING ~ INSTALL "TANNER GAS~ POT. PICK UP ~IT ~IT SUB ~ TAG FLOAT COLLAR PRESSURE TEST ~ 5/8~ CASING TO 2200 PSI. PRESSURE DROPPED TO 2t~O IN t5 SEC. ASSU~ED INFLATABLE .PAKER R~:PORT DATE: USER DEFINED REPORT PAGE C. ELAPSED HOURS OPERAT ION ,..,. ~. ~,...~.,...,...,,,, m ,,,.. 5.00 LD 3. O0 OTHER OPERAT[ ON DESCRIPTION SHEARED C STARTED INFLATING - PRESSURE WAS 2100 PSl AFTER 30 NIN. - OK. LAY DOWN 93 JOINTS 25.6#/FT. DRILL PIPE. TRIP IN TO 767~ & REMOVE DRILL PIPE RUBBERS. DRILL FLOAT COLLAR & HARD CEMENT TO 77'26 . TOTAL DAILY DEPTH JOB COST 106q5.00 23198 ELAPSED HOURS OPERAT ION OTHER ' 50 OTHER 1 . SO OTHER I .50 CIRC 3~00 TRIP 3.50 TRIP I .50 CUT DL DA ! LY AC CUNUL ATED ACCUMULATED Mt.ID COST JOB COST MUD COST 3597 2.479875 i 35848 OPERATION DESCRIPTION ................ io , ,os, ......... ....... CEMENT F/7726 -7753 CHANGE TO LARGER SHAKER SCREENS. DRIL-LING CE~NT F/~753 --7811 FLOAT SHOE 7801, OPEN HOLE F/7811 . CIRCULATE ~ COND,ITION MUD. PUMPED DRY JOB. TRIPPED OUT OF THE HiE ~ LAY OO~N BIT ~AKE UP .NE~ 8HA. PICKED UP DRILLING JARS ~ TRIPPED IN THE' H~E TO SHOE. CUT T~ OR.I~ING LINE 200 ~ SLIPPED IT 90 · ~ORK, ON WE['GHT [ NOICATO~. WASH ~ REAM F178~0 --10395 BRIDGES ~ 7860 1885 7917 & 10180 89/12/18 TOTAL DAILY DEPTH~ JOB COST 10645.00 18~72 DA % L Y AC CU~UL ATED A CCUMUL.A TED ~rUO COST JOB COST MUD cOST 2615 2~98347 I 38463 EL APSED HOURS ' OPERAT ION .50 RE AN 4.00 CIRC 1.50 TRIP OPERATION DESCRIPTION' DAILY COST:~18 472 CUM COST:S2 550 831 WASH REAM F/10395 -10645 10 FILL · CIRCULATE ~; CONDITION HOLE. TRIP OUT OF THE HOLE TO THE SHOE ~ ?'803 . REPORT DATE: 04/2J/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION ~ 18o00 CIRC CIRCULATE SLOW OPERATION DESCRIPTION THE SHOE. WAIT ON LINER EQUIPMENT. ~9/12/19 TOT AL DA [ L Y DA [ L Y ACCUNIUL A TED ACCUMULA TED DEPTH JOB COST MUD COST JOB CDST ~IUD COST ~mmm ~m, ~mmHmm, ~mm~ ,mm ~m~ 106~5, O0 185~0 2856 251690Z I~ l B1 9 EL APSED HOURS OPERAT ION 6, O0 C IRC I · 50 TR I P ~,50 CIRC :1,50 TRIP I 1~,50 CIRC 89/12/20 TOTAL OEP TH 106~5. O0 ELAPSED HOURS t2,00 1 -50 2.50 1 o 50 6,,50 89/12/21 TOTAL DEPTH t 06,~5. O0 DAILY J:00 COST 162~8 OPERA T I ON CIRC 'IR I P CIRC TRIP CIRC DAILY JO8 COST t6270 DAILY. COST:SI8 560 CUM COST=~2 569 391 CIRC, SLOW ~ SHOE · 116 GAL/'MIN, W/O LINER & EQUIPMENT, 'TRIP IN THE HOLE, ~ICK UP KE~LY~.,~ ~REAK CIRC~ATiON NO FILL CIRCULATE & CONDITION THE HOLE. TRIP OUt OF THE HOEE TO~.?THE~' SHOE* CIRCIATE 5LO~ ~ THE SHOE'~ DAILY ? ' ACCUMULATED .... r' ACCUMULATED MUD COST JO~ COST MUD COST OPEraTION ~ESCRIPTION O~AILY COST:~16 2~B COST=$2585 6~ CIRC SHOE, W/O LINNER& EQUIPMENT, TIH X WASH 55 TO BO:TION~' NO~:F[LL CIRC, ~ CONDITION HOLE, PUMP..SLUG TOH TO SHOE~ :NO~TIGMI SPOTS CIRCULATE SLOW.AT SMOE~ 'SLIP DRILL%NO A5 , W/O ON LINNER AND~ EQUIPMENT, .'~ : ACC-MuLAU DAILY ACcUMuLATED TED MUD COST JOB COST MUD COST 405 25~g425 REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE TOTAL DA ELY DAILY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 10645. O0 173,3~ ! 36~ 2600277 146732 OPERATION DESCRIPTION CIRC ~ SHOE X W/O LINER & LINER EQUIPMENT TIH X WASH ~)8 TO BTTM CIRC & CONDITION HOLE TO'H, TO SHOE CiRCRCULATE SLOW AT SHOE X w/O ON LINER AND LINER EQU I PMENT DA ILY DA I L'Y ACCUMUL, ATED ACCUMULATED JOB COST MUD COST JOB COST MUD COST 2/25 16887 1 364 261 ?164 14 8096 TOTAL DEPTH ' 10645. O0 EL APSED H~'RS l 0. O0 OPERAT ION !. 50' TRIP 2.50 C l RC I. OO TR I P 9.00 CIRC OPERATION DESCRIPTION DAILY COST=$~6 887 CUM COST=$2 669 6~4 CIRCULATE SLOW AT SHOE X W/O LINER 6 LINER EQU[PNENT TIH X WASH AND REA~ 58 TO BOTTOM NO FILL CIRCULRTE. RND CONDITION HOLE TOH TO SHOE CIRCULA[E 5LO~ AT SHOE X a:/O LINER AND L[NER EQU~ PMENT ..mm, 89/12/26 TOTAL D EP TH 10645.00 EL APSED HOURS lO.O0 DAILY DA ILY ACCUMULATED ACCU'MULATED JOB COST MUD COST JOB COST MUD. COST 16515 991 2633679 t49087 OPERATION OPERATION DESCRIPTION CIR,C DAILY COST:SI6 515 CUM C05T=$2 686 129 CIRCULATE SLOW AT SHOE X W/O LINER AND LINER EQUIPMENT,, REPORT DAI'E: 04/2.$/90 USER DEFINED REPORT PAGE ,¢ EL APSED HOURS OPERATION OPERATION DESCRIPTION 1.50 TRIP TOH X WASH AND REAM 38 TO BOTTOM NO FILL 2.50 CIRC CIRCULATE AND CONDITION HOLE 1.00 TRIP TOH TO SHOE WITH THE SAME NORMAL TIGHT AREA OFF BOTTOM 400K TO 450K F[~ FIRST COUPLE STANDS. 9.00 CIRC CIRCULATE SLOW AT SHOE X W/O LINER AND LINER EQUIPMENT. TOTAL DA I LY DEPTH JOB 'COST 106,45. O0 t 6769 ELAPSED HOURS OPERAfT ION 8.50 C IRC 1. O0 TRIP 2.50 C IRC I .00 TRIP I ! .00 CIRC DA [LY AC£UMUL ATED ACCUMULATED MUD COST JOB COST MUD COST 1180 2650448 150267 OPERATION DESCRIPTION OAILY COST:~16 769 CUM COST:S2 702 898 CIRCULATE SLOW ~ SHOE~ W'AIT ON LINER ~ EqUIPNENT~ TIH - WASH 38 TO BOTTOM NO FILL . CIRCULATE C CONDITION THE HOLE. TOH TO SHOE ~ 7~03 . SLIGHT TIGHT SPOT CIRC~ATE SLOW a SHOE~ REPLACE KICKBACK PLATES ON DRILLING LINE DRUM. SLIP & CUT DRILLING LI~. 89/12/28 TOTAL DAILY DEPTH JOE1 COS T 10645. O0 15849 EL APSEO HOURS OPERA T I ON 17. O0 CI RC l .. 50 T'R IP 3 o 50 C IRC 2°00 TRIP DA l L Y AC CUMUL A TED ACCUMUL AT ED MUD COST JOB COST MUD COST ?77 2666207 151044 OPERATION DESCRIPTION DAILY COST=SI5 849 CUM COST=$2 718 747 CIRCULATE SLO~ ~ g--5/8~m SHOE. TIH - REAM 68 TO BOTTOM NO FILL CIRCULATE C CONDITION THE HOLE. PUMP DRY JOB. TOH - TIGHT ~ 0210 K 8175 PULLED 40K OVER 89/12/29 'TOTAL DAILY DA l LY ACCUMULATED ACCUMULATED DEPTH JOB COST MUD COST JOB COST MUD COST 106~5. O0 103?7 1 700 2685.67/-~ 152834 REPORT DATE: EL AP SED HOUR $ Io50 ~.50 2. O0 9,,00 1.00 4-.50 OPERATION CIRC TRIP RUTOOL CSGCMT RDTOOL CSGCMT CIRC 89/12/30 TOTAL DEPTH 106~5.00 ELAPSED HOURS 1.00 5°50 USER DEFINED REPORT PAGE OPERATION DESCRIPTION 'DAILY COST: $19 377 CUM COST: $2 738 12% CIRCULATE SLOW ~ SHOE. WAIT ON #BAKER" LANDING COLLAR W/ PROPER THREAD, :' TOH - L/D 54 JOINTS 5" lO.5 #/FT DRILL PIE 2 JOINTS 5" HWOP JARS ] DC & STABILIZERS. RIG UP TO RUN 7-5/8" 3g ~/FT PI IO LIER W/ ST/L CONNECTIONS. PICK ~ & RUN 3171 F-5/8" ~g ~/FT PI iO LINER ASSY W/ ST/L CONECTIONS. RIG DOWN CASING CRE~ ~ BREAK CIRCULATION, ' TIH W/ LINER ON DRILL PiPE · ~ MIN. PER STAND, FILL PIPE EVERY tO STANDS. LINER STOPPED ~ APPROX. t0602 . ATTEMPTED TO MOVE LINER UP HOLE NO MOVEMENT EITHER WAY . RIG UP TO CIRCULATE. 2.50 DA I LY DA I LY ACC, UNULATE O ACCUMULATED JOB COST MUD COST JOB COST MUD, COST 909.36 966 2 7766[~0 ! 53800 3.00 5.00 OPERATION CS~CMT CSGCMT CSGCMT TRIP TRIP SQ CMT OPERATION DESCRIPTION DAILY COST=SO0 g'36 CUM COST=~2 82g 060 STUCK ~ %0605 . BATCH MIX ~ PUMP ~00 SX ,CLASS "G~ CE~NT W/ 0J33 RETARDER & 0.~[ DaB DEFOAMER. UNABLE LAUNCH D~LL PI~E ~IPE~ PLUG. DISPLACE ~E~ENT 252 BH~S OF MUD ~ 7 ~/M'IN. ~L~O ~; F~OAT HELD. AVERAGE DISPL. ACE~NT PRESSURE= 500 PSI. DRAPED BRASS BALL SHEARED HANGER SLIPS {'/ 160'~ 6 SET W/ 30K LBS. SLAC~--'~F, RELEASED FROM HANOE~ ' PULLEO 3 STANDS ~ LAY DOWN DRILL PIPE {iPER PLU6 ASSY, ' TOH- WE~ - PU~PED SL~ 6 CONTINUEO TO TOH, PiC~ UP I5 JOINTS 2-7/8" BUTT TUBING "HO~CO" R[TS PACKER C TIH TO TOP ~ LINER ~ Z435 . BREAK CIRCULATION. RIO UP DO'ELL RTTS ~ bO40. TEST LINES TO 5000 PSI - OK. ESTABLISHED AN INJECTION PRESSURE OF 1300 PSI ~ I REPORT DATE' 04/23/90 USER DEFINED REPORT PAGE EL APSED HOUR $ :3.00 oSO oSO 2°00 3.50 TRIP 3°00 TSTBOP 4.00 LDfDP l. O0 OTHER 4.00 PU OPERATION TRIP CUT DL TRIP OTHER OPERATION DESCRIPTION TIH WI #HOWCO" RTTS TO 0000 SLIP DRILLING LINE 45 . FINISHED TIM SET RTTS ~ 734S PRESSURE RESPONSE DISK VALVE i) 3230 . PRESSURE UP ANNULUS TO 70OPSI TO OPEN DISK VALVE. LOW BUBBLE 8LO~ IN BUCKET ~ ~" HOSE DEPTH AFTER 15 M[N BLO~ ~OULD STOP ~ 2~ HOSE DEPTH~ U~AT R:TTS ~ FILL P[P~ ~/ ~UD ~3 BBLS. SEAT ~ PRESSURE UP ANNULUS T0 700PSI. TEST L[~S TO · 000PS[--OK. ~ESSUR.E TEST LIaR LAP TO 3500PS[ FOR ]5 M[N"OK. UNSEAT ~TTS. T0H 25 STAND5 PIPE ~ET ~]XED ~ PUHPED "DRY JOBe TOH ~ LAY BO~N RTTS ~OND~TED BOP DRILL IH[LE TOH--CREJ ME.ERS ~, STATIONS IN 2--1/2 MIN TESTED ALL VALVES RANS S LINES TO 300PSI-LO~ ~ 3000PSI-HIGH. TESTED ANNULAR PREVENTER TO 2000PSI. TIH ~/ 6--1/2" OCS ~ 5e* HWOP. LAY DO~N CHANGE LO~ER PIPE ~ANS TO 3-~/2~. RIG UP TO PICK 3- t/2~' PICK UP USED 6-1/2a BIT 6LA ~-3/~" OCS JARS 29EA 3--~/~~ HWDP & 3-1/2'm~ S~35 DRILL PIPE. c)of:o I/02 TOTAL .DAI'L¥ DEPTH JOB COST 1064'5.00 18523 EL APSED HOUR S 0.00 1.00 1o00 1o50 °50 1.50 ,,,50 2.00 OPERA T 1 ON PU OTHER TRIP OTHER CIRC OTHER OTHER OTHER DRL DA [ LY A!CCUMUL A TED ACCUMULATED HUD COST JOB COST HUD COST 405 2883423 156896 OPERATION DESCRIPTION DAILY COST= $18 5.2.'3 CUM COST= $2 ~35 873 TIH 6, PICK UP 3--1/2'~ DRILL PIPE. TAG CEMENT DRILL CEMENT F/ 743.2 -8295 TIH. TO lO DRILL CEMENT F/ 10428 -lO501 CIRCULATE ~ 10501 8UN~E TEST ~ELL TO 2000PSI FO~ 15 NIN. PRESSURE OROPPE~ 50PSI. ORILL CENENT F~ 10501 -tO~3~ CIRCULATE - BUNDLE TEST WELL TO 2000PSI. PRESSURE DROPPED 60PSI IN 15 MIN. DRILL FLOAT SHOE ~ 10 FT. OF HARD SAND. REPORT DATE: 04-/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERAT ION I .50 CIRC I o OD OTHER OPERATION DESCRIPTION CIRCULATE CLEAN, PERFORMED "FORMATION INTEGRITY TEST~ TO 16 PPG EQUIVALENT. 90/01/03 TOTAL DAILY DEPTH JOB COST 106gO.O0 24237 DA I LY ACCUNUL A TED AC CUNULATED MUD COST JOB COST MUD COST 3097 290?660 159993 EL A,PSE'D HOUR $ OPERA ! I ON .50 OTHER ! .50 TRIP 3.50 TRIP 4.00 TRIP 4.00 TRIP .50 'CUT DL !. 5 0 D R.L .50 RIGREP 5.50 DRL OPERATION DESCRIPTION MIX AND PUMP St. UG. TOH :30 STOS. SLM TOH. W/ 2B STDS EXCESS PIPE .IN DERRICK SLM . X L/D SAME TOH SLM X LiD BIT & BIT SUB. MAKE UP BIT AND STABILIZERS X TOH CUT gO DRILLING LI REPAIR ~OTARY CH~A DRILL FROH 10665 TO 2.50 OTHER VOLCANO ERUPTED AGAIN AT 6:00 PM AND AT 7:30 PM. THE ASH FALL OUT ON THE PLATFORM WAS ENOUGH TO WARRANT PALING BACK UP IN TO SMOEX SHUTTING DOWN RIG AND PUMP ENGINES. 90/01/0 4 TOTAL DAILY DEPTH JOB 'COST t0834o00 25954 ELAPSED HOURS OPERATION .50 OTHER 5.00 ORE 1.50 OTHER DA I L Y ACCUMUL A TED AC CUMULATED MUD COST JOB COST MUD COST 4005 2933614 ! 63998 OPERATION DESCRIPTION RIG SMUT DOWN DUE TO VOLCANIC ASH. tO 690 TO 10 ?%6 PULL UP TO SHOE X SHUT DOWN DUE TO VOLCANIC ASH, REPORT DATE' 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION 12- 50 DRL 4.50 TRIP OPERATION DESCRIPTION 10 716 TO 10 834 MIX ~ PUMP PILL X TOH TO CHECK BIT HOURS ON BIT 24.5 90'/01/05 TOTAL DAILY DEPTH JOB CO, ST lIO?5-O0 18281 DA ! LY' ACCUMULATED ACCUMULATED MUD COST JOB COST MUD COST 120ar 2951895 165202 EL APSED HOUR S OPERA T I ON 4'.50 TRIP 12.00 DRL .50 TRIP 7.00 DRL OPERATION DESCRIPTION CHANGE BIT X Till X RUBBER DR[EL PIPE. FILL DRILL PIPE AT 2800 AND AT SHOE. REAM ~0 TO BOTTOM NO FILL tO 83~ TO 'Il 013 WITH HYCRLOG PDC BIT 179 a t4.9 ET/HR AVG. SHORT TRiP TO SHOE. NO H~E PROBLEMS. 'li 013 TO 11 075 22:00 fO 24:00 SLO~ DRILLING TO 8 FPH WITH ONE BREAK 16 FPH AND ONE BREAK AT I0 FPH. LITHOLOGY OVER THIS LAST COUPLE HOURS SILTSIONE SAND AND COAL. 90/01/06 TOTAL DAILY DEPTH JOB COST 11128. O0 30044 ELAPSEO HOURS OPERATION 5.00 DRL .50 OTHER 4.00 TRIP 3. 50 TR I P 2 · O0 RE AN I .50 OTHER DA I L Y ACCUMUL A TED AC CUMULAT ED MUD COST JOB COST MUD ,COST I ~3 2981939 166645 OPERATION DESCRIPTION It 075 TO Il 095 DRILLING RATE 2 -3 PER HOUR AND LOST TORQUE MI XEO ANO PUMPEO SLUG X B,LOW OUT KELLY. TOH FOR BIT CHANGE. TIM X FILL PIPE t 5800 & ~) SHOE. HIT BRIDGE AT 1093~- IN COAL SECTION. LAY DOWN DRILL PIPE. 10 934 TO 11 095 5 FILL ~IX AND PUMP I5~/BBL BARATROL PILL BAROID S E(~UIV. TO SOLTEX SPOT ACROSS OLDEN HOLE. REPORT DATE: 04/25/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERAT !ON .50 TRIP .50 OTHER .50 TRIP .50 RE AM 5.50 ORE OPERATION DESCRIPTION TOH TO SHOE. TIGHT FROM !i 068 TO ii Oz~O . SQUEEZE BARATROL PILL X 30 MINa 200 PSI. T[H TO it 020 X L/D DR[EL PIPE TO REAM friTH. !! 020 TO Ii 095 NO T!GHT SPOTS - NO FILL II 095 TO i! !28 · 6 PER HOUR AVE. 90/01/07 TOTAL DA ['LY DEPTH JOB COST 1251. O0 24917 EL APSED H~RS OPERA T 7. O0 ORL l. O0 TR I P I 2 · O0 ORE ~ .00 TRIP 3.00 DRL DALLY ACCUMULATED ACCUMULATED MUD COST JOB, COST MUD COST 2034 3006856 168679 OPERATION DESCRIPTION Il 128 TO Il 171 . ~/[PER TRIP TO SHOE - OK -- REAM 65 TO BOTTOM -- bio F IL'L. ti 171 TO Il 237 ~dlPER TRIP TO SHOE - OK -- REAM 71 TO 80T'TOM -- NO FILL. l! 237 TO I1 251 90/0 TOTAL DALLY DEPTH JOB COST 112'96. O0 2,5869 ELAPSED HOUR S OPE R'A T I ON 9'. 00 ORE I . 00 SUAVE ¥ .50 OTHER .50 TRIP 1. O0 OT~ER 4.50 TRIP 6.50 TRIP DA ! L'Y ACCU~IUL ATED ACCUMULATED MUD COST JOB COST MUD, COST 33 73 :30 32 7'2'5 1 ? 205 2 OPERATION DESCRIPTION Il 251 TO Il 290 CIRCULATE X DROP SURVEY AT 1I 258 SPOT 30 BElL BARATROL PiLL 20 LB/BBL . TOH TO SHOE - TIGHT 'AT 10 c948 SQUEEZE t~ARATROL PILL - SLIP DRILLING LINE - PU~P SE UG. TDH X RETRIEVE S~VEY AT DC S - SURVEY UNREADABLE APPEARED TO BE MOVING AT TIME OF SHOT CHANGE BIT TWO CONES WOULD ROTATE FAIRLY EASILY BUT NO SIDE PLAY - NO MISSING OR BROKEN TEETH - BIT HAD REPORT DATE' 04/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERA T I ON .50 C [RC .50 TR I P 2-00 DRL OPERATION DESCR[PTI ON 34e5 HR . CHANGED MIDGE STAB 1/8 OUT OF GUAGE . T[H TO SHOE RABBET 5# DP CLEAR T[H X REAM 58 TO BOTTON -- NO FILL. it 290 TO It 296 PER HO~R R OP. 90/01/09 TOTAL DA[L¥ O",EP TH JOB COST ! 37 t. 00 % 930,8 O:AI,LY ACCUMUL AI'E O ACCUMULATED MBO COST JOB'COST MUO COST 1 223 3052033 % 73275 EL AP SRO, HOt~R S OPERA T [ ON % 0.~50 DRL' i .00 TRiP - 50 ORE .50 TRiP 6.00 ¢IRC .50 TR%P 5.00 DRL OTHER OPERATION DESCRIPTION D~RILL FROM il 296 TO 11~52 WIPER TRIP [0 S~E TIG,~T AT 11118 10935 AND 10905 . REAM 50 TO BOTTOM. NO FILL. DRILL FRO~ 11352 TO 1135~ TRIP OUT TO 7-5~8~ S~OE O~E TO VOLCANIC ASH FALLOUT TIGHT AT 10~00 MT. REDOUBT E~UPTED AGAIN AT HOUR $. SHUNT DO~N ALL RIG ENGINES EXCEPT ONE PUMP ~AIT FO~ VOLCANIC ASH TO CLEAR CIRCULATE SLOW AT SHOE. TRIP IN HOLE. ~ASH AND REAM 55 TO BOTTOm. NO FILL. DRILL FROM 1135'~ TO 11 37~ DAILY COST=$1g 308 CUN' COST=S3 ~04 358 90/01/10 TOTAL ' DA ! L Y DEPTH JOB COST 11483.00 18565 DA,I L¥ ACCUMUL AT ED AC CUM U'LA T ED MUD COST J08 COST MUD COST ' ! 230 3070598 17450'5 ELAPSED H OURS OPERA T I oN 8. O0 DRL 1.00 TRIP OPERATION DESCRIPTION DAILY COST=$18 565 CUM COST=$3 123 049 DRILLING F/ 11 371 - Il 419 SHORT TRIP TO SHOE & 10 645 - OK. REAM 50 TO BOTTOM - NO FILL! REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERAT [ ON ,.m,..,,,,. ,m...m, ,em ..m* ,,,~ ,,,me 9.50 DRL .50 CIRC · ,50 SURVEY I .50 IR IP .50 CIRC .50 TRIP · 50 TREAT .5'0 C IRC I e O0 TRiI P OPERA T [ ON DESCRIPT[ON .............................. CIRCULAIE FOR 5IT TRIP. ORO'P SURVEY AT I 1~50 . PLATFORH POIER FAILURE POH TO SHOE PO~ER RESTORED TRIP BA~ TO ~TTON -- NO TIGHT SPOTS ON TRIP. SPOT 20 LB/BBL BARATROL PILL ON BOTTOM. TRIP OUT TO ~"5~8le SHORe sQUEEZE 8ARATR[ PILL ~ITH 350 PSI FOR 30 MINUTES. PUMP SLUGi TRiP OUT FOR ~W B,IT. O00000000OOOOOOOOO00OOOOO0000000 000 O0000000000 O0000000000 ( 90/01/11 TOTAL DALLY DEPTH JOEl COS T 11490.00 3,1199 ELAPSED HOURS OPERA T ! ON 4. OO TR,~I P 4.00 T.STBOP 5.50 TRIP .50 CIRC 2.50 TRIP 4.50 T~IP l. O0 CUTOL i.O0 TRIP l.O0 DRL DA I LY ACCUNUL ATED ACCUMULA TED MUD COST JOB COST MUD COST 3127 310479'? 1 77632 OPERATION DESCR IPT[ ON DAILY CCtST:$34 199 CUM C05T=-$3 157 248 TOH -' RU'86ER 3-1/2N D.P. -- LAY DO~/NBIT F.,, STASIL IZERS - TEST 80PE 30,00 PS! P%PE & BLIND RAMS HCR VALVE CHOKE MANIFOLD MUD CROSS CHECK VALVE SAFETY VALVE ~ INSIDE BOP. TEST ANN:~AR PREVENTER TO 2500 TEST ACCUN~ATOR - PICK UP ~0 LEAD COLLAR & STABILIZERS ~ T[H TO 6000' . RA88[T 3.5fl BRIL~ PIPE. TO,H ,~ CHANGE ~'A. MOVE T'~ STABILIZER TO TOP OF LE AD COLL;AR'.. TiM TO SHOE ~ 106~5 ; F~LLPiPE ~ 5900 ~ 10600 CUT ORILL~NG LiNE I00 gSLiP 60 TiH RE,A~ 45 TO 80. TTO~ SLO~ -NO F~LL. ~REAK IN ~HYCALOGa BIT SLOW. DR~LL F/ 11 ~83 TO 11 ~90 90/01/12 TOTAL DAILY DEPTH JOE) COST I 717. O0 19340 DA I LY ACCUMULATED AC CUMLR.. ATED MUD COST JOB COST MUD COST 2264 312413'7 I 79896 REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERA T ! ON 15.50 DRL 1.00 CIRC 5.00 TRIP :~. 50 TR [ P OPERATION DESCRIPTION DAILY COST= $19 3~0 CU~ COST: $3 176 588 D~ILLING F~ 11~90 -~l~Ir W/ wHYCALOG~ ~IT. C%RCULATE -- MIX ~ PUMP "DRY JO8". TOH - TIGHT ~ 11 585 ~ 10 gOO - C~ANGE OUT BAD 5w DRILL PiPE RUBBERSe CHANGE 8iT AT J--22 ~/ 16--15-B g TIH. FiLL PIPE ~ 00000 00000000000000000000000 O0 00 O00 O000000 O0 O0 00000000 0060 90/01/I 3 TOT ~L D!A ! L ¥ DEPTH :JOB, COST .i,,,,.- *.l,-m. 19~3- O0 25447 ELAPSED HOURS OPE R A T [.ON i-50 TRIP 22.50 ORL DA ! L'V AC CUNUL A TED A C CUtVlULA TEl:) MUD COST JCiB COST MUD COST *m~ ,m. OPERA.T1 ON DE SCA [ PT l ON DAILY COST: $25 447 CUM COST'= ~3 202 035 TIH -- REAN 37 TO BOTTON OK. NO FILL. DRILL FROM l! 717 - 11 9~ ~/ AT J-22 ~[T 90/01/14 TOTAL DAILY DEPTH: JOB COST 12016. O0 27505 ELAPSED HOURS OPE RAT I ON ! ,,00 TRIP tt.O0 DRL ,50 CIRC ,50 TRIP 1,00 OTHER 4,00 TRIP ;3,50 TRIP R I GSER DA ! L Y AC CUMUL AT ED AC CuM'UL A TEO MUD COST JO8 COST MUD COST 2393 3177'089 185333 OPERATION DESCRIPTION OAILY COST: $27 505 CUM COST= 13 22<:) 5,40 SHORT TRIP TO THE SHOE t 10 645. TIGHT SPOTS II 445 [; lO 900 . DID NOT SEE TIGHT SPOTS ON TRIP BACK TO BOTTOm, DRILLING F/ ~t 9~3 TO t2 000 CIRCULATE - SPOT ~0 ~BL "B~ROTROL~ P[LLe TOH TO SHOE ~ IO b~5 ~ TIGHT ~ t2 4~S ~ tOegO0 SQUEEZE PILL W/ 350 PSi F/ JO NiNe PU~P aORY JOBa. TOH TIN W/ "HYCALOGa BIT TO SHOE. FILL PIPE & 6 000 l 0 SLIP DRILLING LINE ~5 · RESET ~OUOMATIC~. REPORT DATE USER DEFINED REPORT PAGE ELAPSED HOURS DP ERA T I ON .50 TRIP % . 50 DRL OPERATION DESCRIPTION TIH - REAM 36 TO BOTTOM. NO FILL. DRILLING F/ 12 000 TO 12 016 90/01/1§ TOTAL DAILY DEPTH JOB COST 12358,~0~ 22195 EL APSED ~ H [~J~S OPER AT I ON 24. O0 DRL 0 A I L ¥ ACCUMUL AT E D A C CUI~UL ATE O MUD COST J,O~ COST MUD COST 4 641-9 319928¢ 1 89982 OPERATION DESCRIPTION DAILY COST: $22 195 CUM COST= )3 25% 699 DRILLING FROM 12 016 TO 12 2~58 WITH 6"'IOKiI~ W08 AND 70 RPM. 90/0i/16 TOTAL DALLY OEP, TM JOB COST 12~34.00 19156 ELAPSED HOURS OPERATION 7.50 DRL ~00 TRIP .~0 'OT~ER l.O0 TRIP 2.,50 CIRC .50 TRIP 1.00 TRIP 1o00 CIRC 1.00 TRIP 1.00 RIGREP DAILY AC CUMU L A TED ACCUMULATED MUD COST J. OB COST MUD COST 16~2 3218~,40 19162~ OPERATION DESCRIPTION DAILY COST= $1g ~6 CUM COST= $'3 2?0 DRILLING FROM ]2 2~58 '"%2 %3% SHORT TRIP TO 7~S/8~' SHOE WITH A COUPLE OF ~0~ DR%L~ t.~ ~INUTES TO STATIONS X ABANDON PL ATFOR~ DRILL. TRIP' BACK TO BOTTOM X ~ASH DOWN LAST 20 CIRCULATE AND CONDITION HOLE FOR LOGS. TRIP OUT OF H~E ~ITt4 TIGHT SPOT'S AT 12 035 ~2 000 X' L/D 2 JTS REAM FROM [~ 9~0 emt2 050 X TRIP TO BOTTOM ~ASH/REAN LAST ~0 CIRCULATE OPEN HOLE CLEAR OF FILL. TRIP OUT TO 7--5/B" CASING SHOE WITH NO TIGHT SPOTS OR ABNORMAL DRAG X HOLE LOOKS GOOD. CIRCULATE WITH ONE PUMP ~HILE REPAIRING BREAK-OUT LINE X PU~P SLUG. REPORT DATE: 04/,?.3/'90 USER D~FiNED REPORT PAGE (: e ELAPSED HOUR S OPERA T ! ON ~ ,m, ,e,~ ,,~ ,,.m-,,m .,.., em. em em ,m., ,em- ,,em ~m,, ~,m, ,.., al.. O0 TRIP 1.50 PU 1.50 RUTOOL OPERATION DESCRIPTION TRIP OUT OF HOLE ~ L/D BIT LEAD COLLAR C STAB, PiCK UP 33 JTS 3-l/2" DP & RABBIT IN V-DOOR X STAND BACK_SAME MAKE UP SCHLUMBERGER DI'L/BHC SONIC/GR--SP DRILLPIPE CONVEYED LOGGING TOOLS AND SURFACE TEST SAME X OK. c~O/01/1 7' '1' OTAL D A [ L !t' . DA I L Y ACCUMUL A T ED A CCUfl UL ATE O DEPTH JOB COST HUD COST JOB COST MUD COST 12a,.3~. O0 %'9:84 i 2327 3:238281 1 C~3C~5 ! ELAPSED H OUR S 2.50 toO0 OPERATION TRIP RUTOOL TRIP TRIP RDTOOL 3.50 TRIP 1 . O0 RD TOOL 4.00 TRIP o O0 CUT DL ,50 TRIP OPERATION DESCRIPTION TRIP IN THE HOLE WITH DRILLPIPE CONVEYED LOGGING TOOLS TO 7--5/8" CASING SHOE. PICK UP SiDE O~R ~IRELJNE ENTRY SUB & RIH ~[TH ~ET-CO:NNECT S'TJNGE~ X SEAT TOOL ~ TEST LOGS - TRiP [N HOLE ~JTH DRJLLPJPE AND ~JRELJNE TO ~ 513 TR[P OUT OF H~E TO S]DE DO0~ SUB - ~[REL[NE S~ASHED APPROXIMATELY 4 ABOVE WIRELI~ ENTRY. REPAIR ~iREL[~ AND TEST ELECTR[~ EONNECT[ON - NO POWER READING FROM WET CONNECT DOWNHOLE. PULL WET CONNECT FREE ~[TH T--BAR AND POH ~ITH WIRELINE. F~ND ~'~I-RELINE T'~ISTED AND KINKED APPROXIHATELY 2 ABOVE ~ET CONNECT X T~ SURFACE TESTED OK -- BELIEVE POWER LOSS IN ~[R, ELINE. T~)P OUT OF HiE WITH DRILLPIPE ANO LOGGING TOOLS. LAY DOWN LOGGING TOIS. MAKE UP BIT LEAO COLLAR AND STABILIZERS AND TRIP IN THE HiE TO CASING SHOE X FILL PIPE AT 6000 10 600 CUT 100 OF ORILLING LINE ANO RESET DUOMATIC. TRIP IN THE HiE TO CONDITION FOR LOGS. TOT AL DA I LY DA ! L Y AC CUMU'L A T ED AC C UNtU~L A TED DEPTH JOB COST MUD COST JOB COST MUD COST 90/0 Ill 8 12~3~. O0 22631 2Z~5 % 32,6091 2 196Z~02 R~-PORT DATE: 04/23/90 ELAPSED HOURS .50 I .00 2.00 1 t ~50 OPERATION TRIP TRIP REAM CIRC TRIP l.O0 TRIP [.00 . REAM 2.00 CIRC l. O0 OTHER 3.50 TRIP toO0 RUTOOL 4.00 TRIP 1,50 RUTOOL t. O0 W I RSER 90/0 TOTAL DAILY DEPTH .IDB COST 12434. O0 1867~5 ELAPSED HOURS OPERAT ION !. O0 RUTOOL 1.50 LOG USER DEFINED REPORT PAGE OPERATION DESCRIPTION ..........................- - ; -- - TRIP IN HOLE X RABBIT LAST I ST PICK-UP KELLY AND PULL ~$ JTS. W/ SAME X TIGHT AT 12 184 WASH AND REAM FROM 12 ~50 --12 ~3~ WITH 5--15K~ X TIGHT AT 12 360 CIRCULAIE BOTION$ UP WI IH ALOT OF COAL OVER THE SHAKERS~ SHORY TRIP TO ?--~/8~ CASING SHOE ~ITH TIGHT SPOTS AT 12 ~00 & 12 OOO X WORK THROUGH EACH SPOT SEVERAL TIMES UflTIL CLEARED TRiP BACK TO BOTTOM WITHOUT SEEING ANY PROBLEMS IN T~ DREVtOOs TIGHT SPOTS. K~LLY ~ AND REAM 12 257 --Ia 43% WITH 5-IO'K~ AND LITTLE TROU'~E. PU'HP HIGH VISCOSITY $~EEP OF EZ-MUO AND CIRCULATE UNTIL SHAKERS ~LEAN UP X SPOT 20 BBL HIGH VISCOSITY BARATROL PILL OVER THE BOTTOH 500 OF HOLE TRIP O~ OF THE HOLE ~ITH NO ~AJOR TIGHT SPOTS IN THE OPEN HOLE X 30--50K~ ~BOBBLES~ OVER NORHAL DRAG AT 11~50 AND 10 900 COALS . SQUEEZE BARATRO.L PILL TO 300t FOR 30 MINUTES I PUMP TRIP~ OUT OF HOLE ~ L/O LEAD COLLAR AND STABILIZERS. PICE'UP SCHLUMBERER TOOTS AND TEST WET CONNECT ON SURFACE -- OK. TRIP IN HOLE WITH ORILLPIP'E ~ND FILL AT RIG ,UP WIRELI~ EQU'[PENT AND INSTALL SIDE DoOR ENTRY SU~. RIM WITH WET CONNECT STINGER THROUGH SIDE DOOR SUB. DA I L Y ACCUMUL A T ED AC CUMU'L ATE D MUD COST JOB CDST MUD COST I 606 3279587 I 98008 OPERATION DESCRIPTION PUMP DOWN SCHLUMBERGER S WET CONNECT STINGER X LATCH IN AND SURFACE TEST THE SAME. TRIP IN WITH DRILLPIPE E, aIIRELINE TO 12 108 X REPORT {)ATE: 04/23/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERA T I ON ,,m,..m,, .ii ~,~,. ii,,,, i.,. ~m. I. O0 TR I P I . 50 OTHER 1.50 WlRSER ~.00 TRIP 1.50 OTHER 4. O0 TRIP 2.50 WIRSER .50 CIRC 2.00 LOG 1.00 TRIP 2. O0 WiRSER OPERATION DESCRIPTION LOGGING DOWN ON THE TRIP INTO THE HOLE ~ITH THE INDUCTION TOOL ONLY DUE TO PROBLEMS WITH T~ SONIC TO[ X LOS[ ALL POWER TO THE LOGS AT 12 108 . TRIP OU[ TO SIDE DOOR ENTRY SUB. TEST WIRELIE ELECTRICAL SYSTEM X RIG UP CIRCULATING HEAD AND A/TEMPI TO PUMP THE STINGER DOWN TO RELA/CH INTO DOCKING HEAD - NO SUCCESS. PULL OUT ~ T~ HOLE ~[TH ~IRELINE AND INSPECT CONNECT S~[NGER X NO PROBLEMS WITH WIRELINE OR S T I N,~R. TRIP OUT OF T~ ~LE TO INSPECT DOCKING HEAD AND LOGG[NG TOOLS. TEST ~ET CONNECT AND LOGGING TOOLS X DISCOVERED THAT THE TELEMETRY 'TOOL ~HICH ALLO~S THE SONIC AND IN~<CT[ON TO WORK TOGETHER HAD FAILED X CHANGE OUT TELEMETRY TOOL AND S~RFACE TEST LOGS - TRIP BACK INTO HOLE TO 7~5/8" CASING SHOE. WAKE-UP SIDE OO~ ENTRY SUB ANO RIH WITH ~I. RELINE AND LATCH INTO [HE ~ET CONNECT DOCKING HEAD X POWER UP LOGS AND FUN'CTION TEST OK. MI~ AND PUMP SLUG TO STOP M,UD FLO~ BACK FROM OVER 8ALA N'CED ANNULUSa TRIP IN T'HE H~E ~ITH DRILLP[PE CONVEYED LOGS AND LOG ON THE ~AY IN TO 12 ~20 X SUCCESSFILY O~TA[NED THE [NOUCTION/SONIC/GR/SP FROM THE CASING SHOE 12 420 ~RIP OUT OF THE HOLE TO SIDE DOOR ENTRY SUB X SOME PROB~LEMS ~ITH WIRELINE SLACK KINKING THE WIRELINE ON THE TRIP OUT. PULL THE WIREL[NE LOOSE FROM THE WET CONNECT WITH A T-BAR ANO T~ RIG X PULL OUT OF T'HE HOLE RE~AIN[NG ~I,REL I NE a 90/01/20 TOTAL DAILY DEPTH JOB COST 12434.00 8228~ DA! LY ACCU~UL ATED ACCUMULA TED MUD COST JOB .COST MUD, COST l 205 3361871 l 99213' ELAPSED HOURS OPERA T I ON .50 RDTODL OPERATION DESCRIPTION . REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION · 50 CUT OL ~.00 TRIP 1.00 RDTOOL §.50 TRIP I .50 2.50 C i~RC l . 50 TR t. 50 TRIP 1.00 2.:00 CIRC · 50 CIRC 1-00 TRIP .50 RD TOOL .50 CUT DL 4.. 00 T R [ P l.O0 RDTOOL 6,50 TRiP 1.,,50 REAM 2,,50 CI RC 1.50 TRIP ! ,,,,50 .TRIP I ,,,00 REAM 2.00 CIRC .50 CIRC l*O0 TRIP OPERATION DESCRIPTION SLIP DRILLING LINE AND PUMP DRY JOB. TRIP OUT OF HOLE WITH LOGGING TOOLS 6 LAY DO~N JOINTS 3.5e' DP. RXG DOWN SC~UMBERGER LOGGING TOOLS. MAKE UP 30 X 30 BHA AND TRIP [N HOLE X FILL PiPE CASING SHOE X LAY OO~N 2 JOINTS. ~ASfl AND REAM FROM 12 372 -I2 434 X STICKY & TIGHT. C[RCULATE A~ COND[[[ON ~LE. SHORT TRIP TO CASING SHOE X PULL[N:G TIGHT TO t2 TRIP IN TO '12 280 ~T~ NO EXCESSIVE DRAG. REAM' FROM 12 28~0 -t2 402 X ATTEMPTED TO REAM TO ~OTTOM BUT W~S UNABLE DUE TO HIGH TORQUE AND STICKY CZR~C~ATE A~ CONDITION FOR LINER. SPO~ 25 ~L ~ARATR~ PILL ON TRIP O~T FOR LINER ~[~H LIT[LC A~NORMAL DRAG AND NO RIG DOWN: SC~U'MBEEGER WIRELINE SHEAVES~ SL[P DRILLING LINE A~ PUMP DRY TRIP OUT OF HOLE ~[TH L~GGING TOOLS ~ LAY DO~N JO [ NTS ~5" R[G DOWN 'SC~UNBERGER LOGGING TOOLS. MAKE UP 30 X 30 BHA AND TRIP [N H~LE X FILL PIPE CAS['NG SHOE X LAY DO~N 2 ~ASH AND REAM FROM ~2 372 -.[2 434 X STICKY ~ TIGHT. C[RC~ATE A~ COND,[~[ON HOLE. SHORT T~[P TO CASING SHOE X PULLING TIGHT TO t2 tOO TRIP IN TO [2 2BO ~[~ NO EXCESSIVE DRAG.. REAM FRO~ t2 280 -12 ~02 X ATTEMPTED TO REAM TO ~OTTON BUT ~AS, UNABLE DUE TD HIGH TORQUE AND STICKY COND[TIONS ~ CIRCULATE AND COND[T[ON FOR LINER. SPOT 2~ BBL BARATROL PILL ON BOTTOm'. 'TRIP OUT FOR LINER ~[TH LITTLE ABNORMAL DRAG AND T~GHT SPOTS. 90/0 TOT AL DA ILY DEPTH JOB COST ELAPSED HOURS OPERATION 5.00 TRIP DA ! LY AC CUNUL A TED AC CUMUL ATEO MUD COST JOB COST MUD COST 5.269 345C)852 20qa~8 2 OPERATION DESCRIPTION TRIP OUT OF HOLE FOR 5.5" LINER. R~PORT DATE: 04/23/90 USER DEFINED REPORT P AGE 'e 90/01/22 ELAPSED HOURS 2.00 12.00 3 o O0 .5~0 .50 1.00 5- 00 2.00 2.00 . OPERAT I ON AU'TOOL CS GE M T , ', CIRC CSGCMT CSGCMT TRIP RUTOOL CSGCMT 3.00 CI~C .50 CSGCMT .,50 CSGC~T t.O0 CSGCMT OPERAT ION DESCRIPTION RIG UP JOE S CASING EQUIPMENT X HAVE SAFETY MEETING RUN 50 JOINT5 5.5a 20~ PltO ST/L LINER ON BAKER HMC HYORAULIC HANGER X FILL EVERY 2 JOINTS X RUN 2 TURB'ULATORS ON THE S~:E JOINTS AND EVERY THIRD JOINT THEREAFTER X RUN 5 RAY OIL TOOL [~L[NE CENTRALIZERS AT 10 691 IO: 941 Il 150 It 399 C Il 814 WITH REGAROS TO ~LECTEO PERFORATION INTERVALS X RUN L[~ ~ ~.~ ~ ~ ~A~EO O~ILL~I~E TO ~2 C[R~ATE A,~ CO~'TI~ H~E FOR LOGS~ OR~ BRASS BALL AND P~'P DOWN SAME. RIG ~P'G~WELL AND TES~ LINES TO 3000 PS[ X PRESSER UP ~ 2300 psi ~ND S~&R HANGER SLIPS X SLACK OFF 20K~ TO SET HANNA AT 10 305 BATCH MIX 85 88L5 CLASS WG" CEMENT AND PREPARE TO CEMENT LINER X PUMP 25 BBLS OF CWlO0 CHEMICAL 50 ~$ SPACER 30:0'0 · 10 PPG lO BB,LS WATER 85 BBL5 "G~ CEMENT AND iO B~S ~ATER AT 6 BPM AND 750 PSI. TRlP OUT OF H~E FOR 5.5~ LINER. ~[G UP JOE S CASING E~U~PMENT X HAVE SAFETY MEETING R~N 50 JOINTS 5.~~ ~0~ PltO ST/L LINER ON ~AKER HMC HYORA,ULIC HANGER X FILL EVERY 2 JOINTS X RUN 2 TURB'UL, RTORS ON THE SHOE JOINTS AND EVERY TH[RD JO[N[ THEREAFTER X RUN 5 RAY O EL TOOL [N-L~NE CENTRALIZERS AT lO 691 lO 911 Il 1'50 11 399 ~ Il 814 ~EG~AR'O'S TO SELECTED' PERFORATION INTERVALS X RUN LIaR ON 3,.~u X 5~s TAPERED DRILLP[~ TO 12 402 CI'R'C~A,T'E 'AND CONDTION HOLE FOR LOGS,. DROP Bg'ASS 6ALL AND P~P DOWN SAME e RIG UP DOIELL AND TEST LINES TO 3000 PSI X PRESSurE UP TO 2300 PSI AHO SHEAR MANGER SLIPS X SLACK OFF 2OKI TO SET HANGER AT 10 305 . BATCH MI'X 85 ,BBLS CLASS "G~ CEMENT AND PREPARE TO CEENT E[,ER:~ X P~:P 25 BBLS OF CWtO0 CHEMICAL WASH 50 BIS ~A~R 3000 B tO PPG I0 BeLS ~ATER 85 8~BLS mGm CEMENT AND ~0 BBLS WATER AT 6 BPN AND 750 TOTAL OAILY DEPTH JOB COST t 2 · 34 . 00 '70 301 EL A P'SE O H OUR S 0 P E R A T I 0 N .50 CSGCMT DA I L Y ACCUMUL ATE O AC CUMULATED MUD COST JOEl COST MUD COST 1038 3530 153 20552 0 OPERATION DESCRIPTION PUMP 25 BBLS CWIO00 CHEMICAL WASH 50 BBLS SPACER REPORT DATE: ELAPSED HOURS .5O 1.50 5. O0 5,. O0 3. O0 1.00 [ .50 o 50 4. O0 1.50 5¸0 .50 1.50 5.00 5.0'0 3.00 1o00 .50 °50 4.00 .50 RUTOOL CIRC TRIP TR[P RE~'M CIRC CI RC TRIP RUTOOL CSGCMT RU:TOOL CIRC 'TRIP TR I P WO:C REAM CIRC CIRC TRIP RUTOOL USER DEFINED REPORT PAGE OPERATION DESCRIPTION .......... ;;-;, ;;7[---;; ..... o;o. ,o ;;7..' ..; ................ , R 15.8 PPG AND 10 BBLS WATER X DISPLACE W/ 159 BBLS MUD AT 5 8PM A~ 750 PSI AVERAGE PRESSURE X BUMP PLUG 2 88LS EARLY ~ITH 3000 PSI FINAL CEMENTING PRESSURE X FLOATS HELD X RELEASE FROM HANGER W/ 20 T~NS AT THE SURFACE X P~L ,~ STA~$ OF DRILLPIPE. RIG UP TO REVERSE CIRC~ATE. REVERSE CIRCULATE AT 60 SPM X SAW SOME CLEAN CEMENT 3-5 BBLS A~ ALL OF T~E SPACER AND CHEMICAL WASH BACK TO SURFACE X PU~ DRY JOB. TRIP OUT OF H~E WITH LINER HANGER SETTING TOOL X LAY DOWN '31 JOINTs OF 5~ ORILLPIPE. MAKE--UP 8HA AND LAY DOWN STABILIZERS AND JARS X TRIP IN THE HOLE WITH MILLIOOTH BIT LAY DOWN 3 STDS FROM DERRICK AND ~AIT ON CEMENT. WASH FROM tO 026 -10 305 - DID NOT SEE ANY HARD CEMENT - '~RG LIaR T~ ~ITH tOKe REVERSE .CIRCULATE AND BROUGHT UP SOME CEMENT PIECES. PUMP DRY TRIP OU'T OF H~E FOR RTTS PACKER. CHANGE OUT ELEVATORS TO 2-.~/8a TUBING AND PICK UP SAME- PU~P 2S BBLS C~IO00 CHEMICAL ~ASH 50 BBLS SPACER 3000 ~ lO PPG 10 BBLS ~ATER 85 BBLS #G~ ~ 15.8 PPG AND lO 8BLS WATER X DISPLACE W/ 159 BBLS MUD AT S ~P~ AND TSO PSI AVERAGE PRESSURE X BUMP PLUG 2 BBLS EARLY WITH 3000 PSI FINAL CE~NTING PRESSURE X FLOATS HELD X RELEASE FROM MANGER W/ 20 TURNS AT THE SURFACE X P~L 3 STA'~S OF DRILLPlPE~ RIG UP TO REVERSE CIRCULATE. REVERSE CIRCULATE AT 60 SPN X SA~ SOME CLEAN CEMENT 3-5 BBLS AND ALL OF THE SPACER AND CHEMICAL WASH BACK TO SURFACE X PUMP DRY TRIP OUT OF ":HOLE ~ITH LIN. ER HANGER SETTING TOOL X LAY DOWN ~I JOINTS OF 5a DRILLPIPE~ MAKE'UP BMA AND LAY DOWN STABILIZERS AND JARS X TRIP IN THE HOLE WITH MILLTOOTH BIT TO 10 02G LAY D-O~N 3 STOS FROM DERRICK AND ~AIT ON CEMENT. WASH FROM ~0 026 -tO ~05 - DID NOT SEE ANY HARD, CEMENT - TAG LINER TOP WITH JOKe. REVERSE CIRCULATE AND '~ROUGHT UP SOME CEMENT PIECESe PUMP DRY JOB* TRIP OUT OF H~E FOR RTTS CHANGE OUT ELEVATORS TO 2'-7/8~ TUBING AND PICK UP REPORT DA~E; 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERATION OPERATION DESCRIPTION S A ME. 90/01/24 TOTAL DALLY DEPTH: .JOB COST 12~34. O0 i9987 6.00 PU 4.50 TRIP 7.00 OTHER 2..50 CIRC 1.00 OTHER t.O0 CIRC DA [ L Y ACCUMULA TEl) ACCUNULA TED MUD COST JOB COST MUD COST 939 3550140 206459 OPERATION DESCRIPTION DAILY COST= $19 98? CUM COST= )3 628 515 TRIP OUT AND LAY DOWN 3-1/2e HWDP 4--3/~# DC BIT SUB AND CASING SCRAPER. PICK UP a-~/8~ ~[T ~ SCRAPER 12 EA 2-7/8" DC JOINTS OF 2~7/8~ DP g XO. CHANGE TONGS ~ ELEVATORS. CENENT ~ 12 049 ,. BREAK DOWN 2 STANDS FROM DERRICK ~ PICK UP KELLY. ~RILL CEMENT STRINGERS F/ 12 049 -- [2 077 DRILL FiR'N C:ENE,NT F/ 12 0~7 -- 12 270 193 ODCIRCULATE UNTIL CLEAN. FLUSH STANDPIPE K[LL LINE CHOKE NANIFOLD CHOKE LINE FLO~ L[~ ~ ~POOR BOY" DEGASSE~ ~/ FRESH' ~A T~R ~ REVERSE CIRCULATE NUD F,/ HOLE W/ FRESH 90/0 !/25 6.50 DALLY JOB COST 17539 'O A I LY AC CUMUL A TED AC C LIMUL A T ED MUD COST JOB COST MUD coST 939 356'7679 20 ?398 OPERATION CI RC TR[P OPERATION DESCRIPTION DAILY COST: SiT 539 CUH COST: $3 659 414 A COST ADJUSTMENT WAS AODED TO THE #DRY HOLE DRILLING COSTmt FOR A LATE SPERRY-SUN INVOICE OF $1 3 300 REVERSE CIRCULATE MUD F/ HOLE ~// FRESH WATER. TOH - CHANGE TO 2-7/8" 'TONGS SLIPS & ELEVATORS, REPORT DATE: 0~/23/90 USER DEFINED REPORT PAGE OPERAT ION 3.00 LOG 4.00 LOG !. 50 LOG 2"00 LOG 3' 50 LOG ,50 LOG OPERATION DESCRIPTION .I ,..* *i, ,,.I ~.., ,,,.,. ,,,..,,.*. ,i. ,.. ,.i ..,,. ,.~. ,ii.,,,...,.~ ,..., .i,. ,i, ,,i, LAY DOWN /+-5/8# BIT t~ SCRAPER. RIG DOWN FLOWLINE & PITCHER NIPPLE. RIG UP FLANGED LUBRICATOR & PUleD IN LINE. RIG UP "'ATLAS WIRELINE SVC#. PRESSURE TEST LUBRICATOR TO 1200 PSI - OK. RUN CBL F/ 12 2?4. - 10300 '~LN. BOND LOOKS GOOD. RUN CBL F/ 12 274. -- 10 300 WLM W/ 1000 PSI CSG PRESSURE. BOND IS SOMEWHAT IMPROVEO OVER PREVIOUS LOG, TOH W/ CBL TOOt. ~. CHANGED TO GYRO TOOL, LOG GYRO GOING IN THE HO~.E. TOH W/ GYRO TOTAL DA [ L¥ D A I L Y ACCUNUL ATED ACCUMUL ATE DEPTH JOB ,COST MUD COST JOB COST MUD COST ii I, ~i- ~iI.i~ II i., ,Il. 90/0t/26 12~34.00 40661 0 3608340 20?398 EL AP'SED :HOUR $ ,i. I I ,..i,,,.,-- ~ I .50 1.00 7.50 6.50 2.50 t °50 I. O0 3.50 OPERA T I ON LoG LOG LoG TRIP CIRC CIRC CIRC .LO OPt~RA TI ON DESCRIPTION DAILY COST: $4.0 66! CUM COST: $3 712 23.8 A COST ADJUST~NT WAS ADDED TO THE #DRY HOLE D,RIL,LING COST'~ FOR GYRODATA CHARGE OF $12 163 TOH ~/ GYRO TOOL. ~]G DOWN FLAN~EO LUBRICATOR. CHANGED WIREL[N~ DRU~S. ~[~ ~P P[~CHER ~[PPLE ~ FLO~'L]N~. ~[G UP CAL[8~AT~ ~ RUN G~-NEU-CCL ~RO~ ~D ~O · 055, HAD TO CHANGE OUT NEU TOOL & S~/WARE. TIH i/ ~--5/B'" DRILL BIT TO ~2 270 .. CI'RC~ATED 922 BBLS FRESH WATER UNTIL HOLE WAS CLEAN. CIRCULATE ~HILE MIXING 170 BBL KCL PILL t 1~ LBS/BBL. PUMPED 170 8Bl KCL PILL FOLLOWED BY 10 BBLS KCL WATER ~ 50 LBS/BBL. SPDTIED BALANCED DILL. TOH ~ LAY DOWN DRILL PIPE. PIPE WAS DRY I,I I tI,,I II III ,IIII,II Ifil II II IIIIII ,II II I I II II II I I I I I II I, , II I II I I II tI,I I I I I ! I II II I I I I I II I I II I I III IIII II III I II II II'ti'II II II I,I II 90/01/28 TOTAL DA I L Y DA I L Y AC CUM:UL A TED ACCUMULATED DEPTH JOB COST MUD COST JOB COST Mi, JO COST II IIII I I I,I.I I II I I I II I I II I IIIII II,II II II II I I III I I 1243~. O0 16227 0 3624567' 207'398 REPORT DATE: USER DEFINED REPORT PAGE ELAPSED HOURS OPERA T ! ON t. 50 RIJ TOOL 2 . O0 PUT:8 .FISH OTHER PUTB OPERATION DESCRIPTION DAILY COST= $16 227 CU~ COST= $3 7~a 082 RIGGED UP TO RUN DUAL 2--~/8" ~ ~-7/8" BUTT TUBING. PICKED, UP ~KO~Em 2--i/2" OBL #8~ BHA ~L238 ~ JOINTS 2-7/8" LONG STRIN~ ~ 4 JOINTS 2-3/8" SHOR~ STRING. RIGGED UP "HYDROTEST ~ ALASKA~ ~ HYDROTESTED TUBING TO ~OOO PSI. RAN DUAL TUBING g HYDROTESTEO SAME. HY~OTE'ST T~LS BACKED OF · LONG STRING BROACH. TOH ~ RET/R, IEVEO BROACH. RAN DUE 2--7/8e X 2-3/8# BUTT T~ING -- HYOROTESTED SANE TO 4000 PS[~ THR'~ED FROZ~EN HYOR~TEST UNIT. RAN gO EA DUAL 2"7/8" X 2-3/8" BUTT TUBING. RAN OUAL 2'7/8e BUTT TUBING ~ HYDROTESTEO ALL TUBING TO 40~0 PSI. BROACHED THE LONG STRING. TOT AL DA .|.L Y DA I LY ACC UMUL A TED A C CUMUt_A TED DEPTH JOB COST MUD COST JOB COST MUD COST ; 90/01/29 12434. O0 14828 0 3,639395 207398 EL APSED HOUR $ DP E R A T [ ON 20. O0 PUT8 .50 ROTOOL 2.50 LOG I. O0 O'T HE R OPERATION DESCRIPTION DA[L.Y COST= $14 828 CUM COST=' $3 758 910 RAN G~UA~ 2-7/8~ BUTT TUBING. HYOROTESTEO TUBING TO aGO0 PSI. 8ROACHED THE LONG STRINGa RIGGED DONN HYDROTES~ TOOLS FRO~ SHORT STRING SIDE. STOOD BACK HYDROTEST TOOLS FROM LONG STRI~ SIDE. CORRELATED PERFORATIN~ GUNS TO FORMATION ~[ m~AT~AS ~ I RE~ I NE 'S~C~ SPACED OUT. TUBING IN PREPARATION FOR LANDING. 90/01/~0 TOTAL OEP T H ELAPSED HOURS 2.00 DA I L Y DA '[ LY AC CUMUL A TED A CCUMUL A T ED JO8 COST ~UD COST JOB COST HUD COST :308971 0 3948366 207398 OPERAT ION OTHER OPERATION DESCRIPTION gAILY COST= $308 971 CUM CO'ST= $4 067 881 REPORT DATE: 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERA T [ ON I . O0 RD TOOL 5. O0 OTHER 6. O0 ND 4.. O0 NU I. O0 OTHER 2. O0 OT HER 2.00 CUT DL I. O0 OTHER OPERATION DESCRIPTION HYDROTESTED T~[NG HATERS TO 4000 PSI. iNSTALLED ~V Se LAN~D TU~NG ~/ ~OK LONG ST~ING ~EJGHT 7tK SH~T STRING ~E[GHT. LAID DO~N LANDING JOINTS. RIGGED DOWN DUAL TUBING EQUIP~NT. RENO~ED 8DP RAMS CLEANED S GREASED PREVENTORS AND CHANGED BLEND RAM RUBBERS. NiPPLEO DO~N ~ STACKa NIXED UP ADAPTER FLANGE 6 XMAS TREE. PACK--~F MATERIAL ~ PRESSURE TESTEO TREE TO F'~R 1 ~ "[ NUTES STA'B 6 VALVE IN LONG STRING SIOE. FLANGED CLEANED RIG FLOOR AND 5UB-STR~TUREe THAWED FROZEN 90/01/31 TOT AL DA I L Y DA[ L Y ACCUMUL ATE D AC CUMULATED DEPTH JOB COST ~ COST JOB COST MUD COST 12434 . 00 t 3?08 0 39620 74 20?398 EL APSED HOURS OPERA, T ION I 2. O0 O'1' HER 12.00 OTHER OPERATION DESCRIPTION DAILY COST $13 708 CU~I COST $4 081 589 REPLACE MASTER LINK IN COMPOUND CHAIN - CHANGE OUT $I#IVEL PACKING ANO OIL IN S~I~E~ - ~LEAN ~[T ROOM- THROUGH ~2 MUD PUNP X REPLACE PARTS AS NEEDED - DISCONNECT HOPPERS IN NUD HOUSE - BUMP ANO CLEAN SHAKER PITS - BEGIN 8ISCONNECTING SERVICE LINES. O~SCONNECT MUD LINES SERVICE LINE'S FLOW LINES AND SAlT ~ATER LINES FRON DECK TO RIG,. - ~E~N SHAKER ROON GREASE'SHAKER RAILS RENOVE SHAKER S~REENS. - TH,A~'~- OUT DRA~N LINE FROM PIT RO0~. -- CH'A~E OIL IN R'OTAR~ TABLE,. - LOAD HUSKY ~ITH RENTAL EXCESS TUBING ETC. - INSTALL KOBE 5ET P~P IN ~ELL FOR PRODUCTION OPERATORS TO PUNP FLUID LEVEL TOT AL D Et> T H 90/02/02 12.~34.00 DAILY JOB COS T 15319 DA I LY ACCUMUL A TED ACCU~'UL ATED MUD COST JO8 COST MUD COST 0 39?'7393 20?398 REPORT DATE: USER DEFINED REPORT PAGE C: 90/02/03 EL APS EO HOURS OPERA T I ON i2.00 OTHER 12.00 OTHER OPERATION DESCRIPTION DAILY COST $15 319 CUN COST $4 II! 863 L/D KOBE "B" PUMP ONE BLOWN MIDDLE SEAL - RIG UP LINE TO CIRCULATE DOWN ANNULUS WITH POWER OIL - DISCONNECT X BLOW DOWN STEAM & WATER LINES TO PUMP HOUSE X WATER LINE TO RIG -- WINTERIZE WASH DOWN PUMP - CLEAN AND ORGANIZE TOP DECK -- RIG DOWN WELL ANNULUS CIRCULATING LINE X DROP KO~E #A# PUMP. PU]MP ,w'As HARD 'TO SEAT HAD TO HYDRAULIC IT IN TO CAVITY - PUMP WOULD STROKE WITH GOOD ENGINE EFF[ENCY BUT, WOULD NOT PRODUCE -- TRIED TO RELEASE f~UNP IT WOULD PRESSURE UP TO-3500~ - COULD NOT ROCK IT' OFF SEA',)~ - R:i'G' UP OTIS X GIH X LATCH PUMP IT WAS STUCK ,FAIRLY HARD - TOOK ALOT OF JARRING TO BREAK IT LODSE -- PULLED PU~P X NO REAL VISIBLE DAMAGE OTHER THAN BLOWN #El~ RING LOOKS RERUMAE)LE - G:%H TO PULL STANDING VALVrE -- STANOING VALVE EQ'UA~[ZED AND PULLED VERY EASLY NO V[SABLE DAMAGE -- PREPARE PIT ~6 TO ~.AKE ON DIESEL FOR DISPLACEMENT OF PO~ER' OIL IN ~ELL -- SHELL HAS USE OF HUSKY IN AN -- ~R SC~,DUALEO LOAD OUT TINE FOR ~ORK O~'ER EQUIPMENT WILL BE FO~ 5:00 PM. TOTAL D~ILY DEPTH JOB COST [ 2~3,4,. O0 19392 EL APSED HOURS OPERA T ION l. 50 OTHER 5.00 OTHER ! .. 50 ND 1 3. O0 NU ! o 50 TSTfSOP DA [ LY AC CUMULATED ACCUMLR. ATED MUD, COST JOB COST MUD 'COST ,,em .em em em, ,,emm~ ,.m O 3.99,6785 20 ?398 OPERATION DESCRIP'TION DAILY COST= $19 ]92 CUM COST= $4 131 225 COM~ETION ONLY = $651 2c9:? TO DATE FILL PITS ~%TH DIESEL X REG UP TO DISPLACE WELL. OtSPCACE WELL AND BOTH STRINGS TBG ~ITH 662 0 [ E SEL e RIG DOWN ~/~AY VALVE X INSTALL ~PV S X N/D TREE N/U BOP TEST HYDRILL AT 2000 PSI - TEST 3-1/2 PIPE RAMS HCR KILL LINE VALVES T~O MANUAL VALVE CHOKE LINE SIDE AND CHOKE MANIFOLD AT 3000 PSI ALL OK CONDUCTED TEST WITH ~LIND FLANGE IN SHORT STRING ~ R~PORT OA'fE: 04-/2_3/90 USER DEFINED REPORT PAGE EL APSED HOURS OPERATION ---- e ,.50 TSTE:IOP OPERATION DESCRIPTION SIDE AND 3-1/2 TEST JOINT SCREWED IN TO LONG STRING SIDE. RIG DOWN TEST EG~UIPMENT PULL BLIND FLANGE IN SHORT STRING SIDE REMOVE TEST JOINT FROM LONG STRING SlOE AND SCREW LANDKNG JOINT INTO SHORIF STRING SIDE IN PREP TO CUT 'SHORT STR%NG WITH APR UNIT. 90/02/04. TOT AL DA,[ L Y DEPTH JOB COST 124.34o O0 184?? EL APSED · HC~UR S OPERA T ION l . O0 OTHER 3.00 ~ IRSER I ~ O0 W ~ RSER 2.50 TRIP 2. O0 OIHER ~.00 TRIP .05 Ol HE R 9.00 TRIP t . O0 OTHER O,A I LY ACCUNULA TED ACCUNUL ATED MUD COST JOB COST MUD COST 0 4015262 207.398 OPERATION DESCRIPTION DA[.LY COST: $18 4.7'7 CUM COST: $4. 149 732 COMPLETION ONLY: ~,669 7"14 INSTALL 2--7/8 'RAMS RIG UP APR X GOH X MAKE CUT ON SHORT STRING AT I0 212 ~t.,L.M. - GOH W:ITH WIRE P~L T~G HANGER TO FLOOR g L/D SANE - R/O APR L I NE ,SERV ICE. TOH X L/D TWO PUPS A~ TWO JOINTS ~Ui~D PIPE RACK ~ FOR SHORT STANDS. TDH WITH SHORT STRING SHOT JOINT AT 25.~0 LID SHOT JOINT ~ P/U JOINT. SCREW IN TO LONG STRING W~IT~t LANDING ~OINI - BACK OUT LOC~ DOWN SCREWS - PULL. HANGER IO FLO~ P/U 105~ TO I I OK - PULL HDV - REMOVE HANGER. TOM *ITH LO'~ SIRING OF 2-7tB TOG - LtD FIRST TWO JOINTS X IOH CHANGE ~T IWD COLLARS ~ ONE BAD JOINT LID 31.~3 D/U L/O KOBE CAVITY - SEE REMARKS SECTION OF R'EPORY~ 90102/05 TO'IF AL DA [ LY OA I LY AC CUMUL ATE D ACCU!MULA TED DEPTH JOB ,COST NUD COST JOB COST MUD COST t2 43z~ ,, 00 14089 0 4029351 20?398 EL APSED HOURS OPERATION ~.00 TRIP OPERATION DESCRIPTION TOH WITH TAIL PIPE I CHECK BRASS FIRING HEAD DEBRIS REPORT DATE: USER DEFINED REPORT PAGE ELAPSED HOURS OPERAT ION 2. O0 OTHER 10.50 OTHER I · O0 OTHER .50 OTHER l.O0 OTHER .50 OTHER l.O0 OTHER t,O0 RUTOOL 5.50 TRIP OPERATION DESCRIPTION PRODUCTION D[SC ~AS OK - CLEAN . - T[H WITH TAIL PiPE X INSTALL NE~ RA MARKER I STAND UP FROM T.~ VANN PORTEO SUre PULL 2--7/8" RAMS X INSTALL 2-7/8" X 2-7/8~ DUAL RAMS IN TOP OF DBL GATES AND 2-~B~ X 2--3/8a DUALS IN SINGLE GATE. ~O'RK ON KOBE CA,V[TY - CAVITY LEAKING - REPAIR,., LE~ TEST CAVITY TO 3600 PSI FOR TEN MINUTES -- ~ESSURE [~REASED TO 3800 PSI WITH NO LEAKS - SEE REMARK SECTION OF REPORTe BLEAD OFF PRESSURE X INS[AL';L' TYPE "B~ PUMP IN CAVITY - RIG UP TO TEST PU~ W%TH RIG PUMP. F~CTi~ TEST ~B~ PUMP AT 36 SPM X 500 PSI - SEE R;EMARK SECTION ~ REPORT. PAR~KER HELD CREW SAFETY ~ETING,. RIG UP .,~OE S TO RUN DUAL TB'G. MAKE UP CAV[TY ~[TH I STD ~ND I SIN~E ~ E~CH S'[DE. RIG UP HYDROTEST TOH WITH DUAL STR[~ X HYD~RDTEST SAME AT A. O00 90/02/06 T 0 T AL D A I L Y DAr[ L Y ACC UMULA T E,O ACCU~'~ A T E D DEPTH JOB COST MUD COST JOB !COST MUD COST 1243~. O0 14089 0 ~0~3~ ~0: 20 ~'~98 ELAPSED HOURS OPERA T ION 17.00 TRIP 1.00 ROTOOL 2.00 LOG 3.00 LOG 1.00 OTHER OPERATION DESCRIPTION DAILY COS. T: $1,,~ 08'9 COt~ ;COST: $4. l?? 190 COMP, LET ION ONLY= $69Z 952 RUN DU~L T~G AND HYDROTEST S~ME TO ~000 PSI · LO~ STR,[NG ·-L/D"r'TWO JTS WITH-BAD THREADS X JTS P[NCHED X CHANGE OUT THREE COLLARS ~[TH BAD THREADS ON TRiP iN HOLE. RiG DO~ HYDROTEST TOOLS. X POSITION STRING FOR LOGGING. RiG UP DRESSER ATLAS TO LOG, RA NARKER. G[H ~[TH DRESSER TO LOG RA NARKER X L~ATE ~ DEEP AT ~0 ~8 PE~ DRESSER CBL/VDL/GR - 1/25/~0 X GOH ~[TH ~[RE LINE. SPACE OUT TBG STRINGS -- iN'STALL HANGER ANO PUP LONG STRING. REPORT DATE= 04/23/90 USER DEFINED REPORT PAGE ELAPSED HOURS OPERA T ION 1.00 OIHER' .50 WI RSER .5 0 0'[ HE R I * O0 WI RSER 9.00 OTHER OPERATION DESCRIPTION COMPLETION CUN COST= .$770 596 CLEANED RIG KOOMEY ROOM CELLAR ~ MUD PITS. BLEW DOWN & DISCONNECTED RIG WATER LINES. PREPARED RIG FOR SKIDDING. PUMPED WELL FLUID DO~N TO 5 740 FT. ~t/ KOBE PU$4P. REVERSED OUT KOBE PUMP. L~lO DO~N KOBE PU~P. RZGGED ~ LUBRICATOR TO RIG F~OOR ~ OTIS ~iREL['~ UNITe sTEAMED HYDRAULIC. RESERVOIR TANK ON WIRELINE UNIT. SHEARED KNO~ oUT E~ILiZiNG PLUG IN STANDING VALVE. O~OPPE~ I-1/%" X lO V&NN FIRING BAR. OBSERVED AFTER ~OPPIN6 BAR. ~ IANEDIATE INDACAT[ON ~AN NE~ STANDING VALVE TO FLUID ~ 4730 ~ RELEASEO S~AND] NG VALVE~ RIGGED DO'~N OTIS WIRELINE UNIT. HUNG KOBE PUMP IN TREE 2-t/2~ X I~3/B~ X t-t/2# BOB ~t530~ · SHUT WELL & OBSERVED PRESSER ~UILD UP ~ FLUID LEVEL. SKIDDED'. RIG IN POS.I~ION BETWEEN LEGS ~:] & CLEANED TOP OE~K ABOVE LEG ~t~ BOAT ~E~ H~AD GASKET ~ HA~ING D.[FF]CULTY BUCKIN~ HARO ICE TO LOAD ~.ACK LOAD FOR BEACH. IN 8 H~S THE ANNULUS P~ESSURE HAD CO~E UP TO ~5 PSI ZERO TUBING PRESSURE & FLUID LEVEL HAD MOVED UP THE ANNULUS FROM 4552 TO 4050 502 DATE 90/0,1 / 18 90/0'1 / 18 TOP BOTTOM DEPTH DEPTH BHT 10645.00 12420.00 0.0 106{S.O0 12420.00 0,0 TYPE INDUCTION LOG RESISTIVITY LOG DSERV' ! CE C O'MPA'NY SCHLU MB ER GER SCHLU~4B ER GER FILE- A:GP706.DAT RADIUS OF OI IGIJIIA[ TRAD. UNITS CURVATURE METHOD 1990-05-11 06' 19 VERTICAL SECTION OR CLOSURE DIRECTION IS 354.43 DEGREES MEAS. SURVEY DEPTH NORTH EAST VERT. DEPTH INCL. DIR. (TVD) -SOUTH -WEST SECTION 174.00 .40 11.50 174.00 .60 .12 .58 207.00 .20 59.00 207.00 .73 .22 .71 235.00 .50 51.25 235.00 .83 .36 .79 245.00 .70 342.00 245.00 .92 .39 .88 266.00 .50 296.00 206.00 1.09 .25 1.06 310.00 .80 229.00 309.99 1.02 -.22 1.04 340.00 1.40 190.00 339.99 .53 -.50 .58 370.00 1.g0 186.00 369.97 -.32 -.62 -.26 385.00 1.g0 200.00 384.97 -.81 -.73 -.73 465.00 2.50 231.00 464.91 -3.28 -2.49 -3.02 505.00 3.70 235.00 504.85 -4.58 -4.22 -4.15 580.00 5.50 258.00 579.60 -6.g6 -9.70 -5.98 701.00 6.20 277.00 699.97 -7.49 -21.96 -5.33 761.00 7.30 282.00 759.50 -6.33 -28.92 -3.49 791.00 8.20 290.00 789.28 -5.22 -32.80 -2.01 882.00 10.00 304.00 879.13 1.30 -45.59 5.72 972.00 11.40 320.00 967.57 12.45 -57.97 18.01 1002.00 11.70 328.00 g96.96 17.30 -61.50 23.19 1032.00 11.g0 328.00 1026.32 22.50 -04.75 28.68 1062.00 12.00 333.00 1055.67 27.91 -67.81 34.36 1092.00 12.50 336.00 1084.gg 33.65 -70.55 40.34 1122.00 12.20 340.00 1114.30 39.60 -72.95 46.50 1152.00 11.80 345.00 1143.64 45.55 -74.82 52.60 1182.00 11.50 348.00 1173.02 51.44 -76.24 58.60 1212.00 11.80 354.00 1202.40 57.42 -77.19 64.64 1242.00 12.50 355.00 1231.73 63.70 -77.79 70.95 1272.00 13.00 355.00 1200.96 70.45 -78.38 77.73 1303.00 14.40 355.00 1291.04 77.92 -79.04 85.23 1343.00 15.60 355.00 1329.67 88.24 -79.94 95.58 1402.00 18.50 354.00 1386.07 105.45 -81.60 112.88 1463.00 21.50 354.00 1443.39 126.20 -83.78 133.74 1525.00 25.00 354.00 1500.34 150.54 -86.33 158.21 1588.00 27.80 355.00 1556.77 178.42 -89.02 186.21 1619.00 28.70 355.00 1584.08 193.03 -90.30 200.89 1688.00 30.g0 354.00 1643.95 227.16 -93.58 235.18 1751.00 32.80 354.00 1697.46 260.22 -97.06 268.42 1812.00 34.90 354.00 1748.12 294.01 -100.61 302.39 1875.00 36.80 354.00 1799.18 330.71 -104.47 339.29 1926.00 37.g0 354.00 1839.72 361.48 -107.70 370.23 1988.00 38.30 354.00 1888.51 399.53 -111.70 408.48 2049.00 38.60 353.00 1936.28 437.21 -115.99 446.41 2141.00 39.30 353.00 2007.83 494.62 -123.04 504.22 2236.00 39.60 352.00 2081.19 554.46 -130.92 564.55 2364.00 40.40 353.00 2179.24 636.03 -141.66 646.78 2491.00 41.40 353.00 2275.23 718.57 -151.79 729.91 2615.00 42.50 353.00 2367.45 800.84 -161.89 812.77 2735.00 43.40 353.00 2455.29 881.99 -171.86 894.51 2859.00 44.40 352.00 2544.63 967.23 -183.08 980.44 2991.00 44.90 353.00 2638.54 1059.21 -195.19 1073.15 3117.00 45.90 352.00 2727.01 1148.15 -206.90 1162.81 _ CLOSURE DIST. DIR. DOG LEG I 12 .2 I 17 .g I 23 1.1 I 23 7.0 I 13 2.4 I 348 1.7 I 317 3.1 I 243 1.7 I 222 3.1 4 217 6 223 12 234 23 251 30 258 33 261 4.7 46 272 3.1 59 282 3.0 64 286 5.4 69 289 .7 73 292 3.5 78 296 2.7 83 298 3.0 88 301 3.7 92 304 2.3 96 307 4.2 101 309 2.4 105 312 3.7 111 315 2.6 119 318 3.0 133 322 4.9 151 326 4.9 174 330 5.6 199 333 4.5 213 335 2.9 246 338 3.3 278 340 3.0 311 341 3.4 347 342 3.0 377 343 2.2 415 344 .6 452 345 1.1 510 346 .8 570 347 .7 652 347 .8 734 348 .8 817 349 .g 8gg 349 .7 984 349 1.0 1077 350 .7 1107 350 1.0 m .J J91 ..UU 352~.00 3668.00 3790.00 3911.00 4039.00 4104.00 4287.00 4411.00 4534.00 4658.OO 4813.00 4936.00 5061.00 5152.00 5215.00 5306.00 5338.00 5408.00 5471..00 5503.00 5688.00 5813.00 5907.00 6002.00 6002.00 6125.00 6188.00 6281.00 6372.00 0406.00 6559.00 6621.00 6739.00 6831.00 6923.00 7015.00 7108.00 7200.00 7304.00 7408. O0 7519.00 7604.00 7699.00 7794.00 7887.00 7981.00 8105.00 8200.00 8294.00 8388.00 8474.00 8568.00 8600.00 8754.00 8846.00 8968.00 9061.00 9156.00 9251.00 9347.00 9441.00 9536.00 9631.00 9727.00 ~O. ZU ~+6.70 47.60 47.90 48.30 49.10 50.40 51.30 51.90 52.80 53.20 53,00 54,40 55,50 57.50 55,50 54.00 51.90 50.70 49.90 49.70 49.10 48.30 46.80 46.10 45.80 45.40 44.40 43.20 42.20 41.30 40.50 38.80 37.40 36.50 35.40 34.40 35.20 35.90 36.90 30.30 36.10 35.30 34.4O 33.30 33.30 31.80 30.70 29.60 30.20 29.70 29.60 29.40 29.40 28.90 28.00 27.60 26.00 24.30 23.60 22.10 20.20 18.30 16.50 .tDl .UU 352.00 352.00 351.00 351.00 351.50 350.80 350.80 351.10 351.10 351.50 351.80 351.10 351.80 351.80 352.90 353.20 353.60 353.90 354.30 353.90 354.30 353.90 354.30 354.60 354.60 354.30 355.00 355.30 355.30 355.70 355.70 356.00 350.00 356,00 350.40 355,30 357.10 355.70 355,00 355.70 350.00 355.30 355.30 356.40 356,00 356.40 355,70 355.30 355.70 356.00 356,00 355.70 355,3O 356.40 356.40 357.10 358.10 358.50 350.50 359.20 359.40 2.40 6.60 7.30 ;,'~1.1. / .~1 3008.00 3107.95 3190.92 3272.27 3357.76 3440.26 3519.73 3598.01 3674.42 3750.16 3843.44 3917.29 3991,29 4043,55 4078.32 4128.55 4147,01 4189.19 4228.58 4287.34 4368.02 4449.37 4511.41 4575.53 4616.87 4660.67 4704.75 4770.63 4836.30 4905.39 4974.77 5021.63 5112.48 5184.88 5258.40 5332.88 5409.15 5484.69 5569.31 5653.02 5742.13 5810.72 5887.87 5965.83 6043.06 6121.63 6226.15 6307.37 6388.65 6470.14 6544.65 6626.34 6706.42 6788.31 6868.66 6975.62 7057.65 7142.45 7228.44 7316.17 7402.79 7491.39 7581.07 7672.68 1436.45 1541.84 1630.30 1718.76 1812.93 1905.72 1998.38 2093.35 2188.58 2285.63 2408.10 2505.37 2604.99 2678.73 2730.79 2806.11 2832.07 2887.60 2936.51 3006.92 3101.89 3196.29 3266.53 3336.30 3379.59 3424.66 3469.48 3534,89 3597.66 3661.21 3722.96 3763.45 3838,56 3895.18 3950.36 4004.23 4057,32 4109.72 4169.99 4231.50 4297.51 4347.56 4402.81 4456.96 4508.04 4560.14 4626.69 4675.83 4722.89 4769.63 4812.40 4858.84 4904.00 4950.02 4994.75 5053.33 5097.10 5139.91 5180.28 5219.25 5255.74 5290.01 5321.23 5349.72 -250.g7 -265.78 -279.0O -293.01 -307.50 -321.95 -336.96 -352.08 -367.00 -381.85 -399.82 -414.45 -429.42 -440.05 -447.04 -450.22 -459.23 -465.31 -470.36 -477.64 -487.45 -497.21 -504.47 -511.25 -515.34 -519.72 -523.92 -529.47 -534.63 -539.63 -544.27 -547.21 -552.46 -556.42 -560.08 -563.99 -567.52 -570.82 -575.72 - 580,72 -585.51 -589.32 -593.86 -597.79 -601.22 -604.64 -609.24 -613.10 -616.81 -620.20 -623.19 -626.56 -630.11 -633.45 -636.27 -639.59 -641.43 -642.70 -643.40 -643,84 -644,29 -643.75 -641.29 -637.82 1454.03 1560.36 1649.68 1739.09 1834.22 1927.97 2021.66 2117.64 2213.87 2311.90 2435.54 2533.77 2634.37 2708.79 2761.29 2837.15 2803.27 2919.13 2968.30 3039.08 3134.55 3229.46 3300.08 3370.17 3413.66 3458.94 3503.95 3569.59 3632.57 3696.30 3758.21 3798.79 3874.06 3930.80 3986.08 4040.07 4093.25 4145.72 4206.18 4267.89 4334.05 4384.24 4439.67 4493.94 4545.71 4597.30 4663.98 4713.26 4760.46 4807.31 4850.23 4896.71 4942.01 4988.14 5032.92 5091.56 5135.29 5178.03 5218.27 5257.10 5293.46 5327.52 5358.35 5386.37 /dOd 1458 1565 1654 1744 1839 1933 2027 2123 2219 2317 2441 2539 2640 2715 2767 2843 2869 2925 2974 3045 3140 3235 3305 3375 3419 3464 3509 3574 3637 3701 3763 3803 3878 3935 3990 4044 4097 4149 4210 4271 4337 4387 4443 4497 4549 4600 4067 4716 4763 4810 4853 4899 4944 4ggo 5035 5094 5137 5180 5220 5259 5295 5329 5360 5388 350 350 350 350 350 350 350 350 350 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 .8 .1 1.0 .2 .4 .8 1.1 .7 .5 .8 .3 .5 1.2 1.2 3.5 2.2 4.8 3.0 2.0 .g .3 .5 .9 1.6 1.2 .6 1.0 1.1 1.3 1.1 1.0 1.3 1.4 1.5 1.0 1.4 1.5 1.2 .8 1.0 .6 .5 .8 1.2 1.2 .2 1.2 1.2 1.2 .7 .6 .2 .3 .6 .5 .4 1.2 1.7 1.8 .7 1.6 2.3 2.5 1.9 ~...9823,,.,00 14.80 9882.00 -12.80 9945,00., ~2.1P 10008.00 11.10 10063.00 10.50 10125.00 9.90 10188.00 9.10 10251.00 8.80 10315.00 8.30 10379.00 7.80 10442.00 7.00 10537.00 5.90 10598.00 5.30 10045.00 5.30 10700.00 5.30 10800.00 6.00 10900.00 6.50 11000.00 7.00 11100.00 7.50 11200.00 8.00 11300.00 8.50 11400.00 9.00 11500.00 9.50 11600.00 10.00 11700.00 10.50 11800.00 11.00 12400.00 15.00 12434.00 10.00 3 357 358 359 1 2 3 3 4 4 3 4 360 360 3 5 7 g 11 13 15 15 15 15 15 15 .4O .40 .80 .90 .70 .40 .40 .40 .10 .10 .80 .10 .90 .90 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 7765.10 7822.40 7883.92 7945.03 7999.§5 8000.67 8122.81 8185.04 8248.33 8311.70 8374.13 8468.47 8529.18 8575.98 8630.74 8730.25 8829.06 8928.97 9028.17 9127.25 9226.22 9325.05 9423.75 9522.31 9020.71 9718.96 10303.46 10336.22 5375.52 5389.58 5403.16 5415.82 5426.13 5437.10 5447.49 5457.27 5466.76 5475.70 5484.12 5495.26 5501.21 5505.55 5510.63 5520.48 5531.36 5543.08 5555.63 5568.98 5583.12 5597.99 5613.59 5629.95 5647.14 5665.15 5795.50 5804.27 -635.20 -635.10 -635.55 -635.69 -635.55 -635.16 -634.63 -634.05 -633.43 -632.79 -632.21 -631.44 -631.18 -631.11 -631.07 -631.07 -630.78 -629.96 -62B.04 -026.77 -624.28 -621.11 -617.23 -612.84 -608.24 -603.41 -568.48 -566.13 5411.79 5425.78 5439.34 5451.96 5462.20 5473.08 5483.37 5493.05 5502.44 5511.27 5519.59 5530.61 5536.50 5540.81 5545.87 5555.66 5506.47 5578.06 5590.42 5603.53 5617.35 5631.85 5647.00 5662.85 5079.51 5696.97 5823.31 5831.82 5413 5427 5440 5453 5463 5474 5484 5494 5503 5512 5520 5531 5537 5542 5547 5550 5567 5579 5591 5604 5618 5632 5647 5663 5680 5697 5823 5832 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 353 354 354 354 354 354 354 354 354 354 354 354 ;'.21 4.2 1.2 1.6 1.3 1.0 1.3 .5 .8 .8 .3 1.8 1.1 .0 .1 .7 .6 .6 .6 .6 .6 .6 .6 .5 .5 .5 .7 2.9 Amoco Production Company Denver Region 1670 Broadway P.O. Box 800 Denver, Colorado 80201 303-830-4040 March 28, ~990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attention: Bob Crandall FILE: KJO-393-WF Information Requested Granite Point Wells 17587 #6 and 18742 #32RD Platforms Anna and Bruce, Cook Inlet, Alaska Per your request, I am forwarding a copy of the mud log for the subject wells, and the bottom-hole section for Well 18742 No. 32RD. No open-hole logs were run below 10,767' due to hole problems; a cased-hole neutron log was run and is included with the mud logs. We have also just recently updated our "spider" map which now shows the wellpath for each well in Granite Point. A mylar overlay of this map is being sent to you in a separate package. If you require any additional information on these wells or any other Amoco operated well in Alaska, please contact Julie Victor at (303) 830-4009. K. J. Overcash CLW/clw cc: J. A. Victor RECE'i. ,VEF · APR/ O Oil.& Con , Omrnissio COURIER SERVICE 344-3323 FROM : ' _ .: ADDRESS CITY STATE ZIP SHIPPER ADDRESS CITY STATE ZIP ATTENTION PHONE I DATE ,,"/. /~::~×-I TIME. INSTRUCTIONS ~] 24 HOUR CASE NO. COURT DOCUMENTS SAME DAY [] P/U BY 3PM ONE HOUR $ SAME DAY $ 24 HOUR $ OTHER $ TOTAL $ [] ONE HOUR / / TIME SCHLUMBERGER WELL SERVICES 500 W. INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA 99518 COMPANY · ~!:~::'A ,:.ill -~ ~-.,&5 C(ihiS. LOCATION ATTENTION COMPUTING CENTER PRINT CENTER WELL NAME · . !~;~:} i'-E :'O/i,iT STAT;.: SERVICES . NO. OF BOXES' JOB NO. · 7 ;¢ ¢'; ~.:~ (~ ADD'L TAPES WELL NAME · SERVICES · NO. OF BOXES: JOB NO. · ADD'L TAPES · WELL NAME · SERVICES · WELL NAME · SERVICES · NO. OF BOXES' JOB NO. · ADD'L TAPES · NO. OF BOXES: JOB NO. · ADD'L TAPES · WELL NAME · SERVICES · NO. OF BOXES: JOB NO. · ADD'L TAPES · WELL NAME · SERVICES · NO. OF BOXES- JOB NO. · ADD'L TAPES · Alaska 0ii & Gas Cons. Commissio.~ SCHLUMBERGER COURIER: DATE DELIVERED: RECEIVED BY: ' SCHLUMBERGER WELL SERVICES A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION HOUSTON. TEXAS 77251-2175 February 13, 1990 AMOCO Production Company P.O. Box 800 Denver, CO 80201 Attention: C r a i g W i g g s PLEASE REPLY TO SCHLUMBERGER WELL SERVICES 500 W. International Airport Anchorage, Alaska 99518 ATTN' Print Room Gentlemen: 1 RFol ded Sepia Enclosed are 5 B.L prints of the. PHASOR DIL,BHC Company AMOCO Production Company Well GRANITE POINT STATE 17587 #6 (1/18/90) on: Rd. Field Granite Point Additional prints are being sent to: 2 BL prints Texaco USA County P.O. Box 2100 Denve'r, CO 80201 ATTN' Rich Hill 2 RRolled Sepia 1 BL prints Chevron USA, Inc. P.O. Box 5043 San Ramon, CA 94585-0943 ATTN' Priscilla McLeroy An'bfl~age, AK 99501-3192 ~ ~ C. V; Cha-"~Qn .~ Kenai State Alaska ~prints prints .prints prints prints The film is returned to AMOCO We appreciate the privilege of serving you. SW~ - 1327 F Received Date' Very truly yours, SCHLUMBERGER WELL SERVICES Marc Gunther DISTRICT M&NAG£~ SCHLUMBERGER WELL SERVICES 500 W. INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA 99518 COMPANY LOCATION ATTENTION COMPUTING CENTER PRINT CENTER SERVICES ' NO. OF BOXES' JOB NO. ADD'L TAPES · WELL NAME · SERVICES · NO. OF BOXES: JOB NO. · ADD'L TAPES · WELL NAME · SERVICES · WELL NAME · SERVICES · NO. OF BOXES' JOB NO. · ADD'L TAPES · WELL NAME ' SERVICES - NO. OF BOXES: JOB NO. ' ADD'L TAPES · NO. OF BOXES' JOB NO. · ADD'L TAPES · WELL NAME · SERVICES · NO. OF BOXES' JOB NO. · ADD'L TAPES · SCHLUMBERGER COURIER: DATE DELIVERED: RECEIVED BY: GEORGE'S COURIER SERVICE 344-3323 FROM ADDRESS CITY' STATE DATE ZIP I/'?1 :"-'. I TIME ADDRESS - . :- CITY STATE ZIP ATTENTION PHONE INSTRUCTIONS , ;./ . ..::~ .... . ./ ::'i'- . ~ "'/.., . x':'. .... Z, ",:, ; i []' 24 HOUR CASE NO. COURT DOCUMENTS SAME DAY [] P/U BY 3PM [] ONE HOUR ONE HOUR $ SAME DAY $ 24 HOUR $ OTHER $ TOTAL $ REcEIvED BY I DATE' RETAIN THIS SECTION FOR YOUR RECORDS RE GP STATE 17587 #6 (AMOCO LOGS) DIFL 2&5" CD/CN-GR POROSITY 5" CD-GRRAW DATA (PLUS i LIS TAPE ~. I,I,e, TER FOR ABOVE OPFN HOI,E DATA) ^CBL/V/S 1 PRINTS 0 NEG. i SEPIA 1 PRINTS 0 NEG. I SEPIA 1 PRINTS 0 NEG. I SEPIA PRINTS~NEG.~SEPIA ~PRINTS~NEG.~SEPIA ] ,, PRINTS 0 NEG. 1 SEPIA UN/MS 2~ PRINTS 0_ blEG==~I__ SEPIA (PLUS i LIS TAPE & I,I,qTF. I~ ~[[]I~I~T~ .~ ~.~_~.~ ~__SEPIA FOR ABOVE CN/MS DATA) ,. I. ~.;, I.,. ABOVE RECEIVEDFROM: ATLAS WlRELINE ATTENTIONC. V. CHATTERTON F E 0 S~aNED Na.qka 0il & ^nchorag8 W. R. Halvorson Regional Drilling Superintendent Amoco Production Company Denver Region 1670 Broadway P.O. Box 800 Denver, Colorado 80201 303-830-4040 December 28, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99510 Attn: Mr. Mike Minder File: WRH-185-WF Casing Program Revision Granite Point 17587 Well No. 6 Platform Bruce, Cook Inlet, Alaska Attached in duplicate is a completed Form 10-403, Report of Sundry Well Operations for Granite Point 17587 Well No. 6. Due to unforeseen wellbore problems and the resulting need to set the 9 5/8" intermediate casing shallower than originally planned, the following casing program revision was required to successfully reach the objective horizon and total depth. The 9 5/8" intermediate casing was~etr and cemented on December 15, 1989 at 7803' measured depth (5975' TVD), which is immediately above the C2 sand. To allow the continuance of the original drilling program, a dual liner scenario was designed to cover the remaining open hole and then the objective formations. A 7 5/8" liner will first be run from approximately 7500' to 10,645' and be cemented in place. A 6 1/2" hole will then be drilled to 12,500' MD (10,500' TVD) and a 5 1/2" liner set from 10,500' to 12,500'. The 5 1/2" liner will be cemented over its entire length and completion operations initiated. As per the telecon between Greener-Minder on December 19, 1989, Amoco has commenced operations to fulfill the proposed program. Please contact Julie Victor in our Denver office at (303) 830-4009 if you have any questions concerning this matter. Sincerely, JAV/slj Attachments APPL. lb ~l~er casin~ ~ Suspend ~ = ~ Repair well Operation Shutdown ~ Re-enter suspen Change approved program ~ Ptuggmg ~ Time e~en~ion o~ Opera,or ~ Pull Jubing ~ V~ri~nee ~ P~or~le O~r Well: Development ~ elevation (DF: or. ], RITI Exploratory..__ Stratigraphic n of well, surface L Service '-'"- roperty name ' 'orm Bruce, -'- 17587 2050 FSL x 2015' FWL, Sec. 31-11N-11~ number Att°p°fProductiveinterval 1250' FBL x 2150' FSL At effective depth Sec. 30-11N- 111g At total depth 1 O, 000' TVD, welt condition SUmmary Total depth: measured true vertical Effective depth: measured true Vertical Casing Structural Length Conductor Surface Intermediate Product/on L. ~ ner 2200' Liner (Dr~]Tfng) 3145' Perforation depth: measured number 103 number 1250' FWL x 2150' FSL 5o-883-10034 10,645 feet Plugs (measured) 8,576 feet feet Junk (measured) feet Signed Size Cemented 5--1'/2,, 100 sx 7--5/8. 700 sx true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) ts Description summary of proposal r COmmencing operation 12-1/4,, proposal verbally approved 'fke M'inder apProver Measured depth 12,500' 10,645' Deta oil X Operations program ---- BOp of well On as: Gas ----.. Suspended._._ Service True vertical depth ~0,500' 8,576' AL feet of approval: Plug integrity..__ ~Ssion so representative may witness BOP Test...__ Location clearance Mechanical Integrity Test ..-- Subsequent form required 1"~'7.~ ApProved by Order of the Commission ORIGINAL, SIGNED BY Form 10-403 Rev 06/15/88 LONNIE C. SMITH Title Sr. Staff Admfn. Supv. Approved Copy Returned . Commissioner Date 12/28/89 No. Date SUBMIT IN TRIPLICATE REPORT OF SUNDRY WELL OPERATIO OR A[ 1. Operations performed: Operation shutdown M Stimulate __ Plugging Pull tubing __ Alter casing X Repair well ~ Perforate ~ Other 2. Name of Operator ,,q:~? .Production Company 3. Address P.0.Box 800, Rm. 1833., Denver, CO 80201 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at sudace Leg 1, Slot 7, Platform Bruce 2050' FSL x 2015' FWL, Sec. 31-T11N-R11W Attopofproductiveinterval 1250' FWL x 2150' FSL Section 30-T11N-R11W At effective depth At total depth 10,000' TVD, 1250' FWL x 2150' FSL Section 30-T11N-R11W 6. Datum elevation (DF or KB) 115' KB-HSL 7. Unit or Properly name GP 17587 8. Well number //6 9. Permit number/approval number 89-103 10. APl number 5o- 883-10034 feet 11. Field/Pool Hiddle Kenai, Granite Po 12. Present well condition summary Total depth: measured true vedical Effective depth: measured true vertical 1 O, 645 feet 8,576 feet feet feet Casing Length Size Structural Conductor Surface Intermediate Production Liner 2200' 5-1/2". Liner (Drilling) 3145' 7-5/8" Perforation depth: measured Plugs(measured) Junk(measured) 12-1/4" hole Cemented Measured depth True vertical depth 100 sx 12,500' 10,500' 700 sx 10.,645' 8,576' true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure R ¢I IVED DEC 2 b 1,989 AlaSka .0il & Gas Cons. C.0mmissi0-D / nch0rage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Repod of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended __ Service 17. I hereby cerlify that the foregoing is true and correct to the best of my knowledge. Signed ~{~) ~/"~ ~/~~)~1~[T¥~ Title Regional Drilling Supt. Date 12/20/89 nt Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DEPARTMENT OF NATURAL RESOURCES / ! DIVISION OF OIL AND GAS STEVE COWPER, GOVERNOR RO. BOX 7034 ANCHORAGE, ALASKA 99510-7034 (907)561 -2020 November 9, 1989 Amoco Production Company Denver Regi on 1670 Broadway P.O. Box 800 Denver, Colorado 80201 Attention: K. j. Overcash Subject: ADL 17587, Well No. 6 Granite Point Field Cook Inlet, Alaska Dear Mr. Overcash' The Division of Oil and Gas acknowledges, your letter of October 25, 1989 concerning the commencement of drilling operations on Granite Point Well No. 6, ADL 17587. With the spudding of this well, Amoco satisfies Provision No. 1 of the Suspension of Production and Production Operations granted for this lease on May 5, 1988. Once the well is drilled to its total depth (TD), please inform the division as to the eventual producing status of the well. As the May 5, 1988 suspension order terminated on November 1, 1989, any further suspension of production or production operations may not occur without further authorization from the Commissioner, Alaska Department of Natural Resources. If you have any questions, please contact Michael D. Kotowski of my staff at (907) 762-2546. Sincerely, Director cc' Chat Chatterton, Commissioner Alaska Oil and Gas Conservation Commission 3687A RECEIVED NOV 1 51989 .Oil .& Gas Cons. Comn~Jssior~: October 12, 1989 Telecopy: (907)276-7542 W. R. Halvorson Region Drilling Supt. Amoco Production Company P. O. Box 800 Room 1846 Denver, CO 80201 Re~ Granite Point State 17587 #6 Amoco Production Company Permit No. 89-103 Sur. Loc. 2050'FSL, 2015'FWL, Sec. 31, TllN, RllW, SM. Bt~oie Loc. 1250'FWL, 2150'FSL, Sec. 30, TllN, RllW, SM. Dear Mr. Hampton: Enclosed is the approved application for permit to drill the above' referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinatio~s are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative o~ the Co~ission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Co~ission may witness testi~'~g before drilling below the shoe of the conductor pip~. Very. truly your. s, Chair~n of Alaska Oil and Gas Conservation Co~mission BY O~ER OF ~£1tE COMMISSION ~if Enclosure CC: Department of Fish & Game, Habitan Section w/o encl. Department of Environmental Conservation w/o encl. lit. Bill H. Lamoreaux D. R. Weekley Regional Drilling Manager Amoco Production Company Denver Region 1670 Broadway P.O. Box 800 Denver, Colorado 80201 303-830-4040 September 18, 1989 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99510 Attention: Mr. C.V. Chatterton File: WRH-147-WF Gentlemen: Application for Permit to Drill Granite Point 17587 Well No. 6 Platform Bruce, Cook Inlet, Alaska Attached in triplicate is a completed State of Alaska Form 10-401, Application for Permit to Drill for Granite Point 17587 Well No. 6. We propose to directionally drill this well from Platform Bruce, utilizing Leg 1, Slot 7 to a target location at the top of the Middle Kenai Sand C-5 zone, 8710 feet subsea, 2150 feet FSL, 1250 feet FWL, Section 30, TllN-RllW, Seward Meridian. This well is to be completed as a crestal producing well to recover reserves from the Granite Point Field. Also attached is our Company draft No. 428074 dated September 18, 1989 for $100.00 to cover the filing fee. The proposed directional program, surface plat, drilling program, drilling time curve, and drilling fluid program along with sketches of the BOP equipment and diverter system are also attached. Amoco requests an exception to Regulation 20 AAC 25,050 for only the 8-1/2" hole section (10,200'-12,400'). Due to previous problems surveying the 8-1/2" hole section, we do not wish to run directional surveys in this interval. This will minimize the exposure to stuck pipe/fishing operations. With the wellpath as currently planned, ~e anticipate a maximum deviation in the 8-1/2" hole of 9-10 . A continuous gyro survey will be run at 100-foot intervals from total depth to surface when drilling operations are concluded. Page 1 & Gas Cons~ Anchorage Alaska Oil & Gas Conservation Commission September 18, 1989 Page 2 Drilling operations are scheduled to commence by the end of October, 1989. Please contact Jon Greener in our Denver office, (303) 830-5219 if you have any questions concerning this application. Very truly, D.R. Weekley Regional Drilling Manager Attachments JMG/slj WRH147WF.JMG disk 90 STATE OF ALASKA ALASKA ~.,L AND GAS CONSERVATION CO,,,MISSION PERMIT TO DRILL 20 AAC 25.0O5 I la. Type of work Drill I~ Redrill E]I lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil Re-Entry [] Deepen[]1 Service [] Developement Gas [] Single Zone [] Multiple Zone [] '~. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Amoco Production Compan.y 115' KB-MSL feet Middle Kenai 3. Address 6. Property Designation P.O. Box 800, Rm. 1846, Denver, CO 80201 ADL 17587 Granite Point 4. Location of well at surface Lecl 1, Slot 7 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) Platform Bruce. 2050' FSI x 2015' FWL, Sec. 31-T11N-RIIW GP 17587 Blanket At to[:) of productive interval 8. Well number Number 1250 FWL x 2150 FSL, Sec. 30-T11N-R11W 6 Surety - At total depth 10,000' TVD, 9. Approximate spud date Amoun~~ 1250 F~IL x 2150 FSL, Sec. 30-T11N-R11W October 31, 1989 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Prop_~sed depth (MD and TVD) property line 65 Top-GP 17587 #3 10,,~00' - TVD 2015 feet 1900 feet 2592 12~500' - MD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 1000 feet Maximum hole angle 60 0 Maximum surface 1884 psig At total depth O'VD)5420 psi~ '"i8. Casing program Setting Depth size Specifications Top Bottom Quantity of cement ..... Hole Casing Weight Grade .C. ou. pling Length MD TVD MD TVD (include stage data) 26"' 20" 133 X-52 v~_~_c~ 600 0 0 600 600 To surface 17-.1/2" 13-3/8" 61.68 K-55 BT£ 4000 0 0 4fll3fl ~Rflf~ Tn ~Jrface 12-1/4" 9-5/8" 47~53.5 Ngr) BTC 10550 0 0 10550 862~ 500 8-1/2" 7" 35 S9.~ BT¢. ~2500 ]0000 F~tr)[I12RO)fl lfl.613fl Tn cnV~r ~ni'ire leng~ , , 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth' measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface ~?~ [~ C ~i~/ Intermediate Production -~ r,-,-.', Liner Perforation depth: measured AJask~ 0JJ & Gas C0ns, true vertical ' ; 20. Attachments Filing fee I~ Property plat ~ BOP Sketch ~' Diverter Sketch ~' Drilling program IX] Drilling fluid program ~ Time vs depth plot [~ Refraction analysis [] Seabed report [] 20AAC 25.050 requirements 21. I hereby certify th~at thc foregoing is true and correct to the best of my knowledge Signed ~ ~,'h~ Title Region Drilling Supt. Date Commission Use Only Permit Number APl number ] Approval date ] See cover letter ¢ ~ -//O ~ 50--. 2'~__~- /r---) ¢.',~ ~[ 1 0 / 1 2 / 8 9] for other requirements Conditions of approval Samples required [] Yes ,~ No Mud Icg required El Yes ~ No Hydrogen sulfide measures [] Yes ~No Directional survey required ~Yes [] No Required workingp~ure,~rBO,,p,~m~~J~5M; I-I 10M; E] 15M Other:,///'/,~/~~-- Approved by( f. ,/, (~ ~__~,~/~¢/~,) Commissioner the commission Date Form 10-401 Submit~ {plicate GRANITE POINT 17587 NO. 6 GENERAL DRILLING PROGRAM · · · · · · · · · 10. 11. 12. 13. 14. 15. 16. NOTE: Nipple up 30" riser. Clean. out 30" piling. Drill 17-1/2" hole to 600'. Open hole to 26". Run and cement 20" conductor casing to surface. Nipple up 20" riser and 10" diverter system. Function test all components. Perform formation leak-off test below 20" casing. Drill 17-1/2" hole to approximately 3600'. Run and cement 13-3/8" surface casing to surface. Nipple down diverter system. Nipple up BOP's and test to 3,000 psi. Perform formation leak-off test below 13-3/8" casing. Drill 12-1/4" hole to approximately 10,200' to top set the C2 zone. Run open hole logs. Run 9-5/8" c~sin~ and c~ment with 500 sx. Drill out 9-5/8" casing. Perform formation leak-off test. Drill 8-1/2" hole to total depth (approximately 12,400'). An MWD resistivity and porosity log will be run to replace wireline logs. Run 7" liner 9700'-12,400' and cement over entire length. Perforate zones of interest. Run hydraulic BHA and dual strings of 3-1/2" tubing. Set back-pressure valves, nipple down BOP' s, nipple?~p Test tree to..5,000 psi." Pull back-pressure valves Place well on production· ~ .... A. Mud loggers will be used from 600' - B. Casing design factors of 1·125, 1.0, and 1.8 be used for collapse, burst and tensile strengths ~ respectively. GRANITE POINT 17587 NO. 6 Mud Proqram Interval: SFC - 3600' (26" x 17-1/2" Hole Sections) Mud Type: EPA Mud type No. 5- Spud Mud. Mud Description: Prehydrated Gel - Seawater Weiqht PV ~P FL 9.0 10 10-20 NC Interval: 3600' - TD (12-1/4" and 8-1/2" Hole Sections Mud Type: EPA Mud Type No. 2 - Lignosulfonate Mud. Mud Description: Dual Polymer - Freshwater ~eight PV YP FL 9.0* 10 10-15 15 *Mud weight will be increased as required to control formation pressures. Anchorage GRANITE POINT 17587 NO. 6 ANTICIPATED FORMATION PRESSURES ANTICIPATED PRESSURES BASIS: GP 17587 No. 3 - & No. 5 A maximum estimated bottomhole pressure of 5500 psi is anticipated based on the shut-in surface pressures of the two nearest offset wells. · Calculated Maximum Formation Pressure: 10,000' x .052 x 8.5 ppg = 4420 psi GP 18742 No. 5 SI pressure = 1000 psi 5420 psi · · Maximum Surface Pressure: If 20% of the wellbore is evacuated with 8.5 ppg sea water in the well, the maximum surface pressure is: Psmax = 5420 - (10,000 -(.20 x 10,000) x .052 x 8.5) Psmax = 1884 psi Maximum Anticipated Mud Weight: The maximum anticipated mud weight is 11.0 ppg. 17587.6 disk 91 o~ 2000- 4000 6000 8000 10000- 12000- 14000 Anchorage Operafing Center OP 17587//6 PROJECTED DRILLING TIME CURVE". 20" csg 3 3/8" csg \ \ 5/8" csg * ~ 7" liner I ' ' ' " 25 36 LAT. 60059. 56.92" LONG.151° 17'52 17" ¥ = ~,559,418 X : 269,632 FROM S.W. COR. 2050' NORTH ~ 2019' EAST I I SC ,',. E .... 3o ..CC. NO Z' TION 6 LAT. 60059. 56.32" LONG 151° 17' Y --2,559,356 X : 269,664 FROM S W' COR 19~39' l'JO~ TH 2053' EAST LES '~C. ~, LAT. GO° 59'55.92'' LONG t51°17'52.99'' ' Y = 2,559,3; 7 X : 269,599 FROM SW. COR. 1948' LIORTH I~ 1979' EAST LEG '.," 4 LAT. 6(3059'56 52" LONG. 151° 17'55.51" Y : 2,559,3713 X = 269,560 FROM SW COR. 1948' EAST CERT,FICATE OF SJR,/EYOR ~ mereb/ cerl,.fy lbO! I O'm, prcpe'ly re.g.:,tered or',d I:cens9d Io DroCt,Ce Iond Surveying ~" the Sto~e of ~-\iosk~ .end th'3t this pl,Jl reD~eser, ts c .]cc~:or.' Sj,',,'r-,.,, mo~e .r.,~ "r,e Or urd~r n',y St;l:,Orv~s;O.", end th'3t a~i d,rr.e,"S O.'"'S 3r:d utt,er .Jeto~!s ,]'e Correct ..)or ,esOt · NOTF Ir ~ g r,,~,j i - ', C'~ Stet ,br.S ~),j rJ , ~r ~ q~ t ~ , .It'd :fO':~'~,_ "" ~ 5~'~'.. , All coordinoles ore Alaska Slale Plane Zone 4. A2-2 29 32 r M LI,~:DSEY ~ ASSO" 320t APCTi'- ?.~ V[) PZ ;',,t A M '~ IR ~ C A ?,i,._ P c T R""', ,u ,_ ;',_ t; 'J LOCATED IN NEI/.;.S# I/~I.PP. O1;,'ACTI::O $1:'C.31.TIIN.~'~I~/,S M . F 'J~\' Pi.A- OF TYONEK PLA-I-FORM "B" 7 July igbs, Ameqdad In;el ~0 sho.'l correct , distance SW sec. coc to lc; 2 199~"to I~J89. Directional Program Granite Point 6 FILE: BRUCE.DAT TRAD. UNITS 1989-09-14 RADIUS OF CURVATURE METHOD 13:31 VERTICAL SECTION OR CLOSURE DIRECTION IS 351.91 DEGREES MEAS. DEPTH 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1800.00 1900.00 2000.00 2100.00 2200.00 2300.00 2400.00 2500.00 2600.00 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3750.00 3850.00 3950.00 4050.00 4150.00 4250.00 4350.00 4450.00 4550.00 4650.00 SURVEY DEPTH NORTH EAST VERT. INCL. DIR. (TVD) -SOUTH -WEST SECTION 1.00 315.00 299.98 1.85 -1.85 2.09 1.50 315.00 399.96 3.39 -3.39 3.84 2.00 315.00 499.91 5.55 -5.55 6.28 3.00 315.00 599.82 8.64 -8.64 9.77 4.00 315.00 699.63 12.95 -12.95 14.65 4.00 315.00 799.39 17.89 -17.89 20.23 4.00 315.00 899.14 22.82 -22.82 25.80 4.00 315.00 998.90 27.75 -27.75 31.38 4.00 335.00 1098.66 33.44 -31.73 37.57 4.00 352.00 1198.41 40.10 -33.71 44.45 6.00 352.00 1298.03 48.73 -34.92 53.16 8.00 352.00 1397.28 60.80 -36.61 65.35 10.00 352.00 1496.04 76.29 -38.79 80.99 12.00 352.00 1594.20 95.18 -41.45 100.07 14.00 352.00 1691.63 117.46 -44.58 122.56 16.00 352.00 1788.22 143.09 -48.18 148.44 18.00 352.00 1883.84 172.04 -52.25 177.68 20.00 352.00 1978.39 204.28 -56.78 210.23 22.00 352.00 2071.74 239.76 -61.77 246.07 24.00 352.00 2163.79 278.45 -67.20 285.14 26.00 352.00 2254.41 320.30 -73.09 327.40 28.00 352.00 2343.51 365.26 -79.40 372.80 30.00 352.00 2430.97 413.26 -86.15 421.27 32.00 352.00 2516.68 464.26 -93.32 472.78 34.00 352.00 2600.54 518.19 -100.90 527.24 36.00 352.00 2682.45 574.99 -108.88 584.59 38.00 352.00 2762.31 634.58 -117.25 644.77 40.00 352.00 2840.03 696.90 -126.01 707.70 42.00 352.00 2915.49 761.86 -135.14 773.30 44.00 352.00 2988.62 829.40 -144.63 841.50 46.00 352.00 3059.33 899.42 -154.47 912.20 48.00 352.00 3127.53 971.84 -164.65 985.34 50.00 352.00 3193.13 1046.57 -175.15 1060.80 52.00 352.00 3256.06 1123.52 -185.97 1138.51 54.00 352.00 3316.24 1202.61 -197.08 1218.37 55.00 352.00 3345.27 1242.91 -202.75 1259.08 54.50 352.00 3402.99 1323.78 -214.11 1340.74 54.00 352.00 3461.41 1404.15 -225.41 1421.90 53.50 352.00 3520.54 1484.01 -236.63 1502.54 53.00 352.00 3580.37 1563.36 -247.78 1582.67 52.50 352.00 3640.90 1642.18 -258.86 1662.27 52.00 352.00 3702.13 1720.48 -269.87 1741.34 51.50 352.00 3764.03 1798.25 -280.79 1819.87 51.00 352.00 3826.63 1875.48 -291.65 1897.86 50.50 352.00 3889.90 1952.16 -302.43 1975.29 CLOSURE DOG DIST. DIR. LEG 3 315 .3 5 315 .5 8 315 .5 12 315 1.0 18 315 1.0 25 315 .0 32 315 .0 39 315 .0 46 316 1.4 52 320 1.2 60 324 2.0 71 329 2.0 86 333 2.0 104 336 2.0 126 339 2.0 151 341 2.0 180 343 2.0 212 344 2.0 248 346 2.0 286 346 2.0 329 347 2.0 374 348 2.0 422 348 2.0 474 349 2.0 528 349 2.0 585 349 2.0 645 350 2.0 708 350 2.0 774 350 2.0 842 350 2.0 913 350 2.0 986 350 2.0 1061 350 2.0 1139 351 2.0 1219 351 2.0 1259 351 2.0 1341 351 .5 1422 351 .5 1503 351 .5 1583 351 .5 1662 351 .5 1742 351 .5 1820 351 .5 1898 351 .5 1975 351 .5 Directional 4750.00 4850.00 4950.00 5050.00 5150.00 5250.00 5350.00 5450.00 5550.00 5650.00 5750.00 5850.00 5950.00 6050.00 6150.00 6250.00 6350.00 6450.00 6550.00 6650.00 6750.00 6850.00 6950.00 7050.00 7150.00 7250.00 7350.00 7450.00 7550.00 7650.00 7750.00 7850.00 7950.00 8050.00 8150.00 8250.00 8350.00 8450.00 8550.00 8650.00 8750.00 8850.00 8950.00 9050.00 9150.00 9250.00 9350.00 9450.00 9550.00 9650.00 9750.00 9850.00 9950.00 10050.00 10150.00 10250.00 10350.00 10450.00 10550.00 10650.00 Program- Page,~- 50.00 352.00 3953.84 49.50 352.00 4018.45 49.00 352.00 4083.73 48.50 352.00 4149.66 48.00 352.00 4216.25 47.50 352.00 4283.49 47.00 352.00 4351.37 46.50 352. O0 4419.89 46.00 352.00 4489.04 45.50 352.00 4558.82 45.00 352.00 4629.22 44.50 352.00 4700.24 44.00 352.00 4771.87 43.50 352.00 4844.10 43.00 352.00 4916.94 42.50 352.00 4990.37 42.00 352.00 5064.39 41.50 352.00 5139.00 41.00 352.00 5214.18 40.50 352.00 5289.94 40.00 352.00 5366.26 39.50 352.00 5443.15 39.00 352.00 5520.58 38.50 352. oo 5598.57 38.00 352.00 5677.10 37.50 352. OO 5756.17 37.00 352.00 5835.77 36.50 352.00 5915.9o 36.00 352.00 5996.54 35.50 352. oo 6o77.70 35.00 352.00 6159.36 34.50 352.00 6241.53 34.00 352.00 6324.19 33.50 352.00 6407.33 33.00 352.00 6490.96 32.50 352.00 6575.06 32.00 352.00 6659.64 31.50 352.00 6744.67 31.00 352.00 6830.16 30.50 352.00 6916.10 30. oo 352. oo 7002.49 29.50 352.00 7089.31 29.00 352.00 7176.56 28.50 352.00 7264.23 28.00 352.00 7352.32 27.50 352.00 7440.82 27.00 352.00 7529.72 26.50 352.00 7619.02 26.00 352.00 7708.70 25.50 352.00 7798.77 25.00 352.00 7889.22 24.50 352.00 7980.03 24.00 352.00 8071.21 23.50 352.00 8162.74 23.00 352.00 8254.62 22.50 352.00 8346.84 22.00 352.00 8439.39 21.50 352.00 8532.27 21.00 352.00 8625.47 20.50 352.00 8718.98 2028.30 2103.88 2178.90 2253.35 2327.23 2400.53 2473.25 2545.37 2616.91 2687.84 2758.17 2827.88 2896.98 2965.46 3033.31 3100.53 3167.11 3233.05 3298.35 3362.99 3426.97 3490.29 3552.95 3614.93 3676.24 3736.86 3796.80 3856.05 3914.61 3972.46 4029.62 4086.06 4141.79 4196.81 4251.10 4304.67 4357.52 4409.63 4461.00 4511.63 4561.52 4610.66 4659.04 4706.67 4753.54 4799.65 4844.99 4889.57 4933.36 4976.39 5018.63 5060.08 5100.76 5140.64 5179.73 5218.02 5255.52 5292.22 5328.11 5363.19 -313.13 -323.75 -334.29 -344.75 -355.14 -365.44 -375.66 -385.80 -395.85 -405.82 -415.70 -425.50 -435.21 -444.83 -454.37 -463.82 -473.17 -482.44 -491.62 -500.70 -509.69 -518.59 -527.40 -536.11 -544.73 -553.25 -561.67 -570.00 -578.23 -586.36 -594.39 -602.32 -61o.15 -617.89 -625.52 -633.05 -640.47 -647.80 -655.02 -662.13 -669.14 -676.05 -682.85 -689.54 -696.13 -7o2.61 -708.98 -715.25 -721.40 -727.45 -733.38 -739.21 -744.93 -750.53 -756.03 -761.41 -766.68 -771.83 -776.88 -781.81 _052.18 2128.50 2204.26 2279.44 2354.05 2428.07 25Ol.50 2574.34 2646.57 2718.20 2789.22 2859.62 2929.40 2998.55 3067.07 3134.95 3202.18 3268.77 3334.71 3399.98 3464.59 3528.54 3591.81 3654.40 3716.31 3777.53 3838.06 3897.89 3957.02 4o15.45 4o73.16 413o.16 4186.44 4242.00 4296.83 4350.92 4404.28 4456.91 4508.78 4559.91 4610.29 4659.91 4708.77 4756.87 4804.20 4850.76 4896.55 4941.56 4985.79 5029.23 5071.89 5113.76 5154.83 5195.10 5234.58 5273.25 5311.11 5348.17 5384.41 5419.84 2052 2129 2204 2280 2354 2428 2502 2574 2647 2718 2789 2860 2929 2999 3067 3135 3202 3269 3335 3400 3465 3529 3592 3654 3716 3778 3838 3898 3957 4016 4073 4130 4186 4242 4297 4351 4404 4457 4509 4560 461o 4660 4709 4757 4804 4851 4897 4942 4986 5029 5072 5114 5155 5195 5235 5273 5311 5348 5384 5420 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 351 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 Directional 10750.00 10850.00 10950.00 11050.00 11150.00 11250.00 11350.00 11450.00 11550.00 11650.00 11750.00 11850.00 11950.00 12050.00 12150.00 12250.00 12350.00 12450.00 12500.00 Program- Page,~-- 20. O0 352'. O0 ~<$12 ~ 80 19.50 352. O0 8906.92 19 · O0 352. O0 9001.33 18.50 352 · O0 9096.02 18. O0 352. O0 9190.99 17 · 50 352 · O0 9286.23 17. O0 352 · O0 9381.73 16.50 352.00 9477.49 16. O0 352. O0 9573.49 15.50 352. O0 9669.74 15. O0 352 · O0 9766.22 14.50 352 · O0 9862 · 92 14. O0 352. O0 9959 · 84 13.50 352.00 10056.98 13.00 352.00 10154.32 12.50 352.00 10251.85 12.00 352.00 10349.57 11.50 352.00 10447.48 11.25 352.00 10496.49 5397.47 5430.93 5463.58 5495.41 5526.42 5556.61 5585.97 5614.51 5642.22 5669.10 5695.15 5720.36 5744.74 5768.28 5790.97 5812.83 5833.84 5854.00 5863.77 -786.63 -791.33 -795.92 -800.39 -804.75 -808.99 -813.12 -817.13 -821.02 -824.80 -828.46 -832.01 -835.43 -838.74 -841.93 -845.00 -847.95 -850.79 -852.16 .~.54.45 5488.24 5521.21 5553.36 5584.67 5615.16 5644.81 5673.63 5701.61 5728.76 5755.06 5780.52 5805.14 5828.91 5851.83 5873.90 5895.11 5915.48 5925.34 5454 5488 5521 5553 5585 5615 5645 5674 5702 5729 5755 5781 5805 5829 5852 5874 5895 5916 5925 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 352 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 .5 5 0,.~ u -0 ® c- -- u 0 > 3 M 1 O0,BLD 2.00 Gronite PoTnt Section View D 5750,BID -0.SC,WLK O.C V~K 0.00 [~ ' ' 0 2 4 6 8 10 (Thousends) True Vertical Depth '-0 O 0 _C Oronite Point 6 Plan View ) MD 3750,13LD -0.50,WLK 0.00 ;¥¥Lr\ 4 -1 5 (Thousands) East Coordinate Interference Calculations TRUE 'VERTICAL DEPTH .00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1800.00 1900.00 2000.00 2100.00 2200.00 2300.00 2400.00 2500.00 2600.00 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3800.00 3900.00 4000.00 TRADITIONAL UNITS Granite Point 6 1989-09-14 13:38 RADIUS OF CURVATURE METHOD NO.i(BRUCE ) NORTH EAST -SOUTH -WEST .00 .00 .62 -.62 1.23 -1.23 1.8~ -1.85 3.39 -3.39 5.56 -5.56 8.65 -8.65 12.97 -12.97 17.92 -17.92 22.86 -22.86 27.81 -27.80 33.53 -31.76 40.24 -33.73 48.97 -34.95 61.23 -36.68 77.05 -38.90 96.51 -41.63 119.68 -44.89 146.65 -48.68 177.55 -53.02 212.49 -57.93 251.64 -63.44 295.17 -69.55 343.30 -76.32 396.26 -83.76 454.34 -91.92 517.84 -100.85 588.08 -110.72 664.80 -121.50 748.53 -133.'27 840.66 '146.22 942.60 -160.54 1054.97 -176.34 1181.27 -194.08 1319.60 -213.53 1456.27 -232.73 1588.91 -251.38 1717.76 -269.48 1842.62 -287.03 1964.19 -304.12 2082.29 -320.71 TO (GP703 ) FROM NO. 1 FT DIR. TO (GP6 ) FROM NO. 1 FT DIR. .00 N 0E .00 N 0E .86 S49E .74 S50E 1.53 S54E 1.42 S55E 1.60 S50E 2.04 S61E 3.18 S45E 3.68 S59E 5.81 S43E 6.25 S55E 9.66 S42E 10.24 S52E 12.57 S45E 15.94 S50E 13.91 S66E 22.54 S49E 13.80 N83E 29.25 S48E 18.84 N42E 36.09 S48E 33.13 N16E 42.74 S46E 53.60 N 4E 48.67 S42E 76.72 N 3W 55.89 S37E 100.12 N 6W 66.72 S31E 122.95 N 7W 81.44 S27E 145.45 N 7W 99.63 S22E 167.82 N 7W 122.41 S17E 188.24 N 8W 151.36 S12E 204.49 N 9W 185.04 S 9E 216.81 N10W 223.32 S 7E 226.53 N12W 266.18 S 5E 232.55 N14W 313.61 S 4E 233.56 N16W 365.73 S 3E 229.31 N18W 422.72 S 3E 219.84 N20W 484.91 S 3E 205.04 N23W 552.52 S 2E 184.01 N26W 626.92 S 2E 157.89 N32W 707.61 S 2E 130.21 N43W 795.11 S 2E 106.60 N63W 890.87 S 2E 99.98 S86W 996.33 S 2E 126.85 S55W 1111.95 S 3E 186.50 S34W 1241.23 S 3E 268.32 S23W 1382.61 S 3E 353.89 S17W 1523.00 S 3E 437.56 S14W 1659.52 S 3E 518.50 SllW 1792.07 S 3E 595.49 S10W 1920.51 S 3E 668.88 S 9W 2045.55 S 3E &P jmeS2 2o TO (GP20 ) FROM NO. 1 FT DIR. .00 N 0E .95 S43E 1.69 S42E 2.80 S35E 5.13 S40E 8.30 S44E 12.14 S44E 17.54 S44E 23.69 S42E 29.51 S42E 35.22 S42E 40.73 S40E 45.97 S36E 52.80 S31E 63.61 S26E 78.16 S22E 96.53 S18E 119.19 S15E 145.91 S13E 176.73 S12E 210.96 SllE 246.55 S10E 281.74 S10E 315.15 SllE 347.19 S12E 380.26 S14E 417.78 S15E 461.33 S15E 510.52 S16E 565.52 S16E 627.79 S16E 699.80 S16E 782.40 S16E 879.58 S16E 989.03 S16E 1097.80 S15E 1202.65 S15E 1304.00 S15E 1401.49 S15E 1495.71 S15E 1587.30 S14E PLATFORM BRUCE W/ 10" FLOWLIN~ 'ANNULAR BOP "NL SHAFFER" --15 5//8'' 5000 PSI BX--180 ASS'r' WT. i~,~00 LBS. D~L G,--,!-- ~07 NL SHAF,=:ZR'' --i3 5/8" 5000 PSi ~X--160 A '~'V ~,S~, WT'. i6,3OO LBS. __MUD CROSS-- 13 5/8" BOR= W/ z." o000 S'~l \"A,-V'-$ a: __SGL,~,~.:. ~0, "N~ SmAFFER" 15 5/8" 5000 PSI BX--i60 ASSY W'F gl00 L~S. RISF_R' i8"O0 13 5/8 5000 FLG : W/ GRE'fLOI< CLAMP RING (AX) "CIW" ?/N /,-.1 700--13 LOWER RISER 1i" tO W/ 10 5000 PSt FLC (RX--,~) -. [ 10" DIVERTER SYSTEM PLATFORM BRUCE 10" LINE OVERBOARD 12" BALL VALVE OPENS WHEN HY, Y_.,D R_.I L _CLO_SE_S 1 1 2o" 2ooo# HYDRIL ANNULAR 130P 2" FILLUP and KILL LINE 20-2ooo~ SLIP-ON HEAD '~ z ~ ~ z · r -. ¢ .-- ~,e · · .... eit . . .... · ...... . ~ ....... ~ ............... ':,_', ~ ./ ........................... ;;;~ ~ ie[~, · e ~ .~ ........... ,, ~ ~ ........ ~ ~.- ~ ........ d E z E _z z. .Z .......... ._ :~ g;-u/',O./.~ _.. ........................ · s~ ~d~t... P. iT. . l ~b ................................. r~sp..~_.t~ ..... .o~r- ~.~j .d'"l .-. t~s,~.~,~O~'sv~"r!o.ro ~,~.. ~v,.~.px~r .piTS ~,~J~.c._F,,~ .............................. . ?"t~ . ? ~ 'rS , ' ~ ' _. . OCT 05 '89 13:54 AMOCO PROD CO DEM REG DRLO P.5/'6 Amoco Production Compa..~ sho.~o. / o~ ~ ENGINBBRING CHART ,~ ~ , . ~ ~" ~ : ~ ~ ,~ ' .~ ~' , ~ ~ · . ; · ~ ',, ~.~- ..... ~ .................. ~ ....... . ............ . ............... ~ ............... ~ ............. , ........ ,, ...... . ........ ~ ........................... ~, ............. ~ ................ ~ ............. ~,. ............ ......................................... . ............. , ......... , ................ ,. ........ .. .~ ,, ......................... , ................................... ...., .... ~.~ ~ ........................................ . ........... ., .... . ......... ~ ......... : .............. ~ ~ i' I ~ ~ ; ~ , · , ~ ~ '. , ~ ,: :. ~ , : " ' ,~ ..... ~ .... ). .... j ........ ~ ....... ~', .... ff ................. ~ ~' ............... ~ .................................. , ::~'..~:'.":~ ..... ~. ' :' ' ~.~'~; ........ [... .......... '. .......................... .~ ...................... , ~. .......... ~. ............ +.: .................. ;. .................................. : ~ ~ ,~,, ~~,, .: ~, ,~" :,. ~,~ ~ .~.-.,: ........ ............ .... ~., ~ ~ ..... .......... ..,. ....... ... ........ :..,,., ..... . :,: .............. fI ~ t , , J ~ ~ ~ i t t ' ' ; t ~ , I ~ , " .,,,JL.,~ , ,,, , . ,,, ~ ..... t ........ " ....... 11 ........................ :'i ............................ ~ ...... * ........ ~ ............. ~" ............ ~ ~ ...... ~ .................. : ....... ' ........ " ..................... : ............ ' .................. :" ........... ~ ............. : ............ ~'~ ~ ~ .. ' ~ t ' " ' '" ...... f ...... ' .......... :' ", ...... ~ ........... :' ' .....(' '" ............ : ............... . ................. .,.% DO NOT WRITE IN THIS SPACE OCT 05 '89 13:=5~, AMOCO P~OD CO DEN REG DRLG I I Amoco Production Compa,I ,I £NGIN£;RINO CHART SUBJECT ..... ~.. P. 6/6 Sheet Nc,, ~ Of ,~ File Well HiStory File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi .. No special 'effort has been made to chronologically organize this category of information. HICIIOF L; D '~ ,AL,~SKA COMPUTI:NG CEN'TER '"' ..,":- ....... SCHLU:MB~GER ........ * COMPANY NAME : AMOCO PRODUCTION CgMPANY WELL NAME : GRANITE POINT STATE 17587 FIELD NAME : GRANITE POINT ~O~OUGH : KENA! .STATE : ALASKA API NUMBEP~ : 50-833-10034 RE;E~ENCE Ng : 73680 LIS TAPE VERIFICATION LISTING SCHLUMBERGER ALASK~ COMPUTING CENTER 2~-FE5-1990 16:18 PAGE: ~.,.L HE AD.'_-R SERVICE NAME : EDIT D~TE : ORIGIN : FL[C REEL NAME : 73680 CONTINUATION :~ : PREVIOUS REEL : CO~MENT : ~MOCO, GRANITE P~NT STATE 17587 ~ TAPE HEADER SERVICE N~ME : EDIT D~TE : 90/02/28 ORIGIN : .reLIC TAPE NAME : 7.3,580 CONTINUATION '~ : 1 PREVIOUS T~PE : COMMENT : AMOCO, GRANITE POINT STATE 1~587 ~6, API ~50-~33-10034 * ~'- ~'~ FILE HE~DER ~'~ ~- ~ ~ FILE NAME : EDIT .001 SERVICE : :LIC VERSION : O01AO~ DATE : 90/02/28 MAX REC SIZ~ : 1024 FILE TYPE : LO L,~ST FILE : COMPANY N~ME: ~MOCO PRODUCTION COMPANY WELL: GRANITE POINT STATE 17587 ~6 FIELD: GRANITE POINT BOROUGH: KEN~I STATE: ~LASKA ~PI NUMBER: 50-8 ~-100~4 LOC~TION: 2050' FSL ~ 2015' PWL SECTION: 31 TOWNSHIP: llN RANGE: llW PERMANENT DATUM: MSL ELEVATION: 0 LIS TAPE VERIFICATION LISTING SCHLUMBERGER .ALASK,~ COMPUTING CENTER 2~-~EB-19gO 15:18 PAGE: LOG MEASURED FROM RKB 115 ABOVE PERMANENT D&TUM ELEVA'TI DNS K~: 115 DF: 1!4 GL: DATE LOGGED: RUN NUMBER: TD DRILLER: TO LOGGER: 18-J,~N-90 ON E 12 ¢ 34 12410 C~SING: 7 5/8" 2 DRILLER DEPTH OF 10645 AND LOGGER DEPTH OF 10644 BIT SIZE: TYPE FLUID IN HOLE: EZ MUD DENSITY: 9.5 PH: 9.5 VISCOSITY: FLUID LOSS: MUD RESISTIVITY: FILTR4TE RESISTIVITY: MUD CAKE RESISTIVITY: 3.17 ~ 68 3.39 .9 73 3.49 ~ '71 TIME CIRCULATION ENDED: 1Z:O0 17-J,~N 'TIME LOGGER ON '50TTOM: 20:37 18-JAN M~XIMUM TEMP ~ECORD~O: 163 LOGGING DISTRICT: LOGGING ENGINEER: WITNESS: KENAI CRY~R GqEENER TOOL NUMBERS: DIS-HC 276 SLS-WA 1427 SGC-S& AMS-AA 968 SLX-DB 1372 DIC-E5 271 SLC-U~ 278 TCC,-A TCM-~5 248 FIELD REMARKS: LOGS RUN ON TLC SYSTE.~ LOG CORRELATED TO ATLAS C2l LOGS RUN ON DOWN PASS INDUCTION RUN WITH STANDADD PROCESSING DATE JOB STARTED: Z7-FEB-90 JOB REFERENCE NO: 73680 LDP/ANA: KOHRING COMPUTING CENTER REMARKS: NOTE THAT THE GR/SP/AMS D&TA :ROM THE BHC FIELD PRINTS DOES NOT EXACTLY MATCH TH~S LIBRARY T&PE FROM 11543' TO 11598' BECAUSE OF THE FOLLOWING FIELD SPLICE PROCEDURES: BHC FIELD DAT~ FROM FILE =05 WAS SPLICED TO FO4 @11570' GR/SP/AMS DATa :ROM DTE/BHC PASS WAS SPLICED AS FQLLOWS~ FO4 = 10604' TO 1154~' LIS 'TAPE VERIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER 28-FE~-t990 16:18 PAGE: FO? = 115'43' TO 11598' FO5 = 1159B' TO 1Z414' FILE- EDIT.O01 AMOCO PROQUCTIDN COMPANY GRANITE POINT GRANITE POINT STATE 1'7587 50-833-10034 DATA SAMPLED EVERY -.5000 FEET DATa INCLUDED- * TOOL EXTENSiION TOOL ~-' TYPE USED NAME -,~- DIT-E .DTE PHA.SOR DUAL INDUCTION SFL 10664' TO 12413' ~ ~HC .BHC BOREHOLE COMPENSATEO SONIC 10636' T~ 12385' TABLE TYPE : CONS TUNI V~LU DEFI CN AMOCO PRODUCTION COMPANY FN GRANITE POINT WN GRANITE POINT STATE 1'7587 APIN 50-~33-10034 FL ZDSO' FSL & ZO15' FWL SECT 31 TOWN llN RANG llW CDUN KENAI STAT ~LASK~ N~TI USA W'ITN GREENER SON 548554 PDaT MSL EPD FT O. LMF RKB ~PD FT 1!5. EKB FT 115. EOF CT 114. EGL FT -999.25 TOD ~T 1243~. COMPANY NAME FIELD NAME WELL NAME API SERIAL NUMBER FIELD LOCATION SECTION TOWNSHIP RANGE COUNTY STATE OR PROVINCE NATION WITNESS' NAME SERVICE ORDER NUMBER PERMANENT DATUM LOG ~EASUREO FROM LIS TAPE VERIF'IC,&TIDN iL[STING SCHLUMBERGER ALASKA COMPUTING CENTER 2B-FEB-1990 15:18 BLI TLI TCS STEM TUNI FT FT DEGF VALU 12410. 10500. lZ:O0 17-JAN 20:37 18-JAN TABLE TYPE : CURV DEFI DEPT SFLU ILM ILO SP IFRE IOQF IMQF IIRD IIXO IIRM GR TENS MTEM MRES HTEN DT TTI TT2 'TT3 TT4 SP GR TENS MTEM MRES HTEN SPHI DEPTH CHANNEL NAME SFL RESISTIVITY (UN~VERAGED) MEDIUM INDUCTION STANO,~RO PROCESSED RESISTIVITY DEEP INOUCTION. STAND~RD PROCESSSD RESISTIVITY SPONTANEOUS POTENTIAL INDUCTION CALIBRATED FREQUENCY IDQF DEEP INDUCTION QUALITY F~CTOR IMQF MEg INDUCTION QUALITY FACTOR DEEP INDUCTION REAL INTERMEDIATE CONDUCTIVITY DEEP INDUCTION QUAO IN'TERMEDIATE CONDUCTIVITY mEDIUM INDUCTION REAL INTERMEDIATE CONDUCTIVITY GAHMA RAY TENSION MUD TEMPERATURE MUO RESISTIVITY HEAD TENSION OELT~-T CSAT TRANSIT TIME FOR CSAT CS~T TRANSIT TIME FOR CS~T 2 CSAT TRANSIT TIME FOR CSAT TRANSIT TIME 4 SPONTANEOUS POTENTIAL GAMM~ RAY TENSION ~UD TEMPERATURE flUO RESISTIVITY HEAD TENSION SONIC POROSITY ~'~'~-~. DATA FORMAT SPECIFICATION RECORD '~'~-~- ~ SET TYPE - 6~EB --,-""~ TYPE REPR CODE VALUE ! 56 0 2 65 O PAGE: 4 DEFI BOTTOM LOG INTERVAL TOP LOG INTERV,AL TIME CIRCULATION STOPPED TIME LOGGER AT BOTTOM _IS TAPE V~RIFICATIDN LISTING ~CHL!JMBERGER ALASKA COMPUTING CENTER 28-~E~-1990 16:18 PAGE: TYPE REPR CODE VALUE 3 73 112 4 66 1 5 66 6 7 65 8 ,58 0.5 9 65 FT 11 66 9 13 66 0 14 65 :T 15 66 68 16 66 1 0 66 0 SET TYPE - CHAN ~* NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR I9 OROER ~ LDG TYPE CLASS MOD NUMB S&MP ELEM CO,~E ~)EPT F'T 548554 O0 SFLU O'TE OHMM 548554 07 ILM DTE OHMM 548554 07 iLD 9TE OHMM 548554 OT SP DTE MV 548554 07 IFRE OTE HZ 548554 O? IDQF gTE 54.8554 OT IMQF DTE 54~554 0'7 IIRD DTE MMHO 548554 O? I~X9 DTE MMH~ 548554 OT 'IIRM OTE MMHO 548554 O? GR gTE GAPI 548554 07 TENS DTE LB 548554 07 MTEM OTE OEGF 548554 07 MRES DTE OHMM 548554 07 HTEN DTE L~ 548554 07 DT BHC US/= 54~554 07 TT1 BHC S 548554 07 TT2 BHC S 548554 07 TT3 BHC S 548554 07 TT4 BHC US 54855~ 07 SP BHC MV 54~554 07 GR BHC G~P~ 548554 07 TENS 3HC LB 548554 07 MTEM BHC DEGF 54~554 07 MRES BHC OHMM 54~554 07 HTEN BHC l~ 548554 07 SPHT_ BHC 548554 OT 000 O0 0 I I I ~ 68 220 01 0 I I I ~ 68 120 44 0 I 1 I 4 68 120 46 0 I I I 4 6 8 010 O1 0 1 1 1 4 68 000 O0 0 1 1 1 q 68 000 O0 0 1 1 1 4 68 DO0 O0 0 1 t I ¢ 68 DO0 O0 0 1 1 1 4 68 000 O0 0 1 1 1 ¢ 68 000 O0 0 1 1 1 4 68 310 O1 0 I I 1 4 68 535 Z1 0 1 1 1 4 68 000 O0 0 1 I 1 4 68 DO0 O0 0 1 I 1 4 68 000 O0 0 I 1 1 4 68 520 BO 0 1 I 1 4 68 522 83 0 1 1 1 4 68 522 83 0 I 1 1 4 68 522 83 0 1 1 1 4 68 522 83 0 1 1 1 4 68 010 O1 0 1 1 1 4 68 310 O1 0 1 1 1 4 68 635 21 0 1 1 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 1 1 1 4 68 000 OO 0 1 1 1 4 68 DO0 O0 0 1 1 1 4 68 PROCESS (HEX) 0000000000 0000000000 DO00000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 O00000OO00 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 _IS TAPE VERIFICATION LISTING ~CHLUMBERGER ALASKA CCMPUTING CENTER DEPT. 12414.500 SFLU.DTE SP.DTE -999.250 IFRE.DTE IIRD.OTE -999.250 IIXD.DTE TENS.gTE -999.250 MTEM.DTE DT.BHC 69.188 TT1.BHC TT4.3HC 381.500 SP.BHC MTEM.BHC -999.250 MRES.BHC DEPT. 12400.000 SFLU.D'TE SP.DTE 1'73.000 IFRE.DTE IIRD.DTE 23.359 IIXD.DTE TENS.OTE 795.000 MTEM.DTE DT.~HC 69.188 TTI.8HC TT4.SHC 381.5 O0 S'P. BHC MTEM.3HC 175.000 ~RES.BHC DEPT. 12300.000 SFLU.OTE SP.DTE 185.500 IFRE.OTE IIRD. DTE 69.375 IIXD.DTE TENS.gTE 870.000 MTEM.DTE DT.BHC 65.313 TT1.BHC TT4.~HC 339°000 SP.BHC MTEM.BHC 174.625 MRES.BHC DEPT. 1ZZO0.O00 SFLU.DTE SP.DTE 135.250 ~FRE.DTE IIRD.OTE 26.313 IIXD.DTE TENS.OTE 950.000 MTEM.DTE DT.BHC 78.813 TTI.BHC TT4.BHC 354.750 SP.BHC MTEM.BHC 1'74.125 MRES.BHC DEPT. 12100. 000 SFLU. DTE SP.DTE 129.750 IFRE.DTE IIRD.DTE 25.172 IiXC.DTE TENS.DTE 920.000 MTEM.D'TE DT.BHC 78.063 TT1.BHC TT4.8HC 338.750 SP.BHC MTE~4.BHC 173.500 MRES.BHC DEPT. 1ZO00.O00 SFLU.DTE SP.DTE 202.875 IFRE.DTE IIRD.OTE 110.5,63 IIXD.DTE TENS.gTE 950.000 -~TEM.DTE DT.BHC 78.685 TT1.BHC TT4.BHC 363.090 SP.EHC MTEM. 8HC 171. 875 MR ES. BHC DEPT. 11900.000 SFLU.DTE SP.DTE 152.375 IFRE.DTE IIRD.DTE 29.750 IIXD.OTE TENS.DTE 830.000 MTEM.DTE DT.~HC 75.688 TT1.BHC 28-FE3-1990 16:18 -999.259 ILM. DTE -999.250 -999.250 IDQF.OTE -999.,250 -999.250 IIR.M. D'TE -999.250 -999.250 MRES.DTE -999.250 0.000 TT2.BHC 0.000 -999. 250 GR. BHC -999.250 -'999.250 HTEN.BHC -999.250 9.188 ILM.DTE ZO.O00 ID'QF.DTE 9.133 IIRM.DTE 175.000 MRES.DTE O.O00 TT2.BHC 173.000 GR.BHC 0.721 HTEN.BHC 1~o969 ILM.DTE 20.000 IDQF.DTE 5.758 IIRM.DTE 174.625 MRES.OTE 0.000 TTZ.BHC 185.500 GR.BHC 0.723 HTEN.BHC 45.8~+4 ILM.DTE ZO.O00 IDQF.OTE 4.746 IIRM. DTE 174. 125 MRES.DTE 0.001 TT2.BHC 135.250 GR.BHC O. 815 HTEN. BHC 44.938 ILM.DTE 20.000 IDQF.DTE 6.336 IIRM.DTE 17~.500 MRES.OTE O.O00 TT2.BHC 129.750 GR.BHC 0.979 HTEN.BHC 7.934 ILM.OTE 20.000 ID~F.DTE 11.484 IIRM.DTE 171.875 MRES.DTE 0.001 TT2.BHC 202.875 GR.BHC 1.012 HTEN.BHC 61.156 ILM.DTE 20.000 IDQF.DTE 7.465 IIRM.OTE 1.71.250 MRES.DTE 0.000 TT2.BHC 93.125 0.000 10.Z19 0.721 O.O00 61.656 51'3.500 13-016 0.000 72.813 0.723 0.000 67.438 491.000 40.65,6 0.000 23.391 0.815 O.OOO 52.125 540.509 41.500 0.900 22.922 0.97'9 O.O00 53.438 317.500 6.8Z~+ 0.000 138.125 1.012 0.000 82.938 579.000 40.406 O.OOO 23.531 1.102 0.000 ILO.gTE IMQF.DTE GR.DTE HTEN.DTE TT3.BHC TENS.BHC SPHI.SHC ILD.DTE I MQF. gTE GR.OTE HTEN.OTE TT3.SHC TENS. BHC SPHI. BHC ILO.OTE IMQF.OTE GR.DTE HTEN.OTE TT.3. BHC TENS. 8HC S PHI. ~)HC ILO.gTE IMQF.DTE GR.DTE HTEN.OTE TT3.BHC TENS.BHC SPHI.SHC ILD.OTE IMQF.OTE GR.DTE HTEN.OTE TT3.8HC TENS.BHC SPHI.BHC ILD.OTE IMQF.OTE GR.DTE HTEN.OTE TT3.0HC TENS.SHC SPHI.gHC ILO.OTE IMQF.DTE GR.DTE HTEN.DTE TT3.SHC PAGE: -999.250 -999.250 -999.250 -999.250 0.001 -999.250 :10.253 38.188 0.000 61.656 513.500 O.OOl 795.000 10.253 12.797 0.000 67.438 491.000 0.000 870.000 '7.350 34.875 0.000 52.125 5~0.500 0.001 950.000 17.463 36.156 0.000 53.438 317.500 0.000 9Z0.000 16.901 7.668 0.000 82.938 579.000 0.001 950.000 17.359 31.266 0.000 44.469 605.500 0.000 .IS TAPE YERIFICATION LISTING ;CHLUM~ERGi_'-R ALASK,R COMPUTING CENTER TT4. BHC 355. 500 SP. BHC MTEM.OHC 171.250 MR~S.EHC DEPT. 11800.000 SFLU.~TE SP...gTE 164.1 25 IFRE.DTE IIRO.DTE 41.906 IIXD.DTE TENS.gTE 1020,000 MTEM,DTE DT. BHC 75.438 TT1,BHC TT4,~HC 402.750 SP,BHC MTEM.BHC 170,125 MRES,BHC DEPT. 11700,000 SFLU,DTE SP,DTE 138.750 IFRE.DTE IIRD.DTE 31,641 IIXD.DTE TENS.gTE 645.000 MTEM,OTE DT.BHC 87.688 TT1.BHC TT4. BHC 3,68.25.0 SP. BHC MTEM,BHC 169.250 MRES.BHC OEP'T. 11600,000 SFLU.DTE SP.9TE 199,250 IFRE.DTE IIRD.DTE 111.313 II×D.DTE TENS.gTE 800,000 MTEM,D'TE DT.BHC 72,625 TT1.BHC 'TT4.BHC 336.750 SP.BHC MTEM.SHC 158.250 MRES.BHC DEPT. 11500.000 SFLU.DTE SP.DTE 158.375 IFRE.DTE IIRO.OTE 30.734 IIXD.DTE TENS.DTE 1355.000 ~TEM.DTE DT.BHC 69.688 TTloBHC TT4.BHC 314.250 SP.BHC MTEM.BHC 167.000 MRES.BHC DEPT. 11400.000 SFLU.DTE SP. DTE 186. 250 IFRE. D'TE IIRD.DTE 36,188 IIXD,DTE TENS. OTE 790. 000 MTEM. DTE DT.SHC 120,625 TT1.BHC TT4,BHC 481.000 SP,BHC MTEM.BHC 165.000 MRES.BHC DEPT. 11300.000 SFLU.DTE sm-gTE 162.875 IFRE.DTE IIRD,DTE 67,375 ZIXD.DTE TENS.gTE 800,000 MTEM.DTE DT.~HC 87.500 TT1.BHC TT4.SHC 366.750 SP.BHC MTEM.BHC 163.750 MR~S.BHC DEPT. 11200,0 O0 SFLU. gTE SP. DTE ! 92,375 ZFRE. gTE I IRD. OTE 83.43~ IIXD. gTE TENS, gTE 545.0 O0 MT EM. gTE 28-FEB-1990 16:18 152.3?5 GR. BHC 1.102 HTEN. ~BHC 24o781 ILM,DTE 20,000 IDQF,DTE 4.262 IIRM. DTE 170,125 MRES,DTE 0.001 TT2.BHC 16~.125 GR.BHC 1,072 HTEN,BHC 59.625 ILM.DTE 20,000 IDQF.D'TE 5.332 IIRM.DTE 169.250 MRES.OTE 0.001 TT2.BHC 138.750 GR.BHC 1.08'3 HTEN.BHC 8.492 ILM,DTE 20,000 IDQF.DTE 7,750 IIRM.DTE 168.25;0 MRES.DTE 0o000 TT2,BHC 199.250 GR,BHC 1.103 HTEN.BHC 44.031 ILM.DTE 20.000 IDQF.DTE 3.666 IIRM. D'TE 167.000 MRES.DTE O.OOO TT2.BHC 158.375 GR.BHC 1.122 HTEN.BHC 103.250 ILM.DTE 20.000 IDQF.DTE 5.109 IIRM.DTE 165.000 MRES.DTE 0,001 TT2.BHC 186.250 GR.BHC 1.141 HTEN.BHC 13.039 ILM.DTE 20.000 IDQF.DTE 6.938 IIRM.DTE 163.T50 MRES.DTE 0.001 TT2.BHC 162.875 GR.BHC 1.138 HTEN.BHC 12.164 ILM,DTE 20.000 IDQF.DTE 5.770 IIRM, DTE 162.875 MRES.DTE 44.469 605.500 19.188 0.000 49.43 $ 1.072 0.000 51. 563 626.500 41.406 0.000 22.953 I .083 0.000 47.656 628.500 7.633 0.000 ! 23. '750 1.108 0.000 93.375 653.000 31.906 0.000 29.797 1.122 0.000 68.188 576.000 34.031 0.000 27.938 1.141 O.O00 58.500 661.500 13.375 0.000 70.875 1.138 0.000 77.688 562.000 10.766 0.000 87.938 1.142 TENS.BHC SPHI.EHC ILO,gTE IMQF.DTE GR,DTE HTEN,OTE TT3.BHC TENS,BHC SPHI.BHC ILO.gTE IMQF.OTE GR,DTE HTEN.DTE TT3.BHC TENS.SHC SPHI.~HC ILO,gTE IMQF.DTE GR,DTE HTEN. OT E TT3.~HC TENS.BHC SPHI,BHC ILD.DTE IMQF.DTE GR.DTE HTEN,DTE TT3,BHC TENS.BHC SPHI.BHC ILO.gTE IMQF.DTE GR.DTE HTEN.DTE TT3.BHC TENS.BHC SPHI.BHC ILD.DTE IMQF.DTE GR.DTE HTEN.DTE TT3.BHC TENS.BHC SPHI.SHC ILO.OTE IMQ:.OTE GR .gTE HTEN.OTE PAGE: 830.000 15.122 Z1.359 0.000 51. 563 626.500 0.001 lOZO .000 14.934 30.047 0.000 47.656 628.500 0. 001 645.000 24.110 7.785 0.000 93.375 653.000 0.001 800.000 12.828 29.563 2.000 68.188 576.000 0.000 1355.000 10.627 27.469 0.000 58.500 661.500 0.001 790.000 48.783 13.086 0.000 77.688 562.000 0.001 800.000 23.970 10.414 0.000 70.563 643.000 .IS 'TAPE YERIFICATION LISTING ~CHLUMBERGER ALASKA COMPUTING D'T. 8HC 91. 188 T TT4.SHC 3'71. 000 MTEM.BHC 162.875 HR DEPT. 11100.000 SF SP.DTE 187.875 IF IIRD.DTE '73.625 II TENS.gTE 595.0D0 MT OT.SHC ,58,500 T TT4. BHC 3,30.250 MTEM.BHC 161.750 MR DEPT. 11000.000 SF SP.DTE 200.375 IF IIRD.DTE ,41.000 II TENS.gTE 845.000 MT DT.SHC 95.250 T TT4.SHC 404.750 MTEM.~HC 159.5-00 MR D EP'T. 10900. 000 SF SP.DTE 109. 500 IF IIRD.DTE 33.344 II TENS.OTE 960.000 MT DT.BHC 70.125 T TT4.SHC 322. 000 MTEM.BHC 158.750 MR DEPT. 10800.000 SF SP.gTE 171.750 IF IIRD.OTE 21.906 II TENS.gTE 1ZTS.000 MT DT.BHC 82.250 T TT4.SHC 382.250 MTEM.SHC 157.125 MR DEPT. 10700.000 SF SP.DTE 166.250 IF IIRD.DTE 132.3T5 II TENS.gTE 945.000 MT DT.BHC 77.500 T TT4.BHC 354.000 MTEM.SHC 155.375 MR DEPT. 10603.500 SF SP.DTE 196.250 IF IIRO.DTE 67.563 II TENS.DTE 1000.000 MT D'T. BHC 65. 125 T TT4. BHC 303.500 MTEM.BHC 150.750 MR END OF g~TA ~--~ CENT ER 71. BHC $ P. B H C ES. 5HC LU.DTE RE. DT:E XD.DTE EM.DTE T1.BHC SP.BHC ES.BHC Ltl, OTE RE. OTE XD. DTE EM · D'TE T1.BHC SP.BHC ES.BHC LU.CTE RE.gTE XO.DTE E M. D'T E T1. BHC SP.BHC ES.BHC LU.DTE RE.DTE XD.DTE EM.DTE 71 .BHC SP.BHC ES.BHC LU.DTE RE.DTE XD.DTE EM.gTE T1.BHC SP.BHC ES.BHC LU. DTE RE.gTE XD.DTE EM.gTE 71. BHC SP.BHC ES.BHC 28-~mE8.-1990 16:18 0.001 TT2.BHC 192.375 GR.BHC 1.142 HTEN.BHC 8.734 ILM.DTE ZOoO00 IDQF.DTE 7.945 II~M.DTE 161.750 MRES.DTE O.OOD TT2.BHC !87.87'5 GR.BHC 1.119 HTEN.BHC 34.750 ILM. DTE 20.000 IDQF.DTE 4.070 IIRM.OTE 159.500 MRES.DTE 0.001 TT2.BHC 200.375 GR.~HC 1.151 HTEN.BHC 49.313 ILM.DTE 20.:000 IDQF.DTE 4.27'7 IIRM.DTE 158.750 MRES.DTE O.OOO T'T2.BHC !09.500 GR.SHC 1.116 HT!EN. BHC 50.906 ILM.DTE 20.000 IDQF.DTE 5.215 IIRM.DTE 157.125 MRES.D~TE 0.001 TT2.BHC 171.750 GR.BHC 1.043 HTEN.BHC 7.258 ILM. DTE 20. 000 IDQF. OTE 11.~8 IIRM.DTE 155. 375 MRES.DTE 0.001 TT2.BHC 166.250 GR.BHC 1.049 HTEN.BHC 14.1)3 ILM.DTE ZO.O00 IDQF.DTE 8.031 IIRM.DTE 150.750 MRES.DTE 0.000 TT2.BHC 196.250 GR.BHC 1.199 HTEN.BHC 0.000 70.563 643. 000 10.438 0.000 90.688 1.119 0.000 43.375 655.000 21. 719 0.000 43.719 1.151 0.000 66.063 667. 000 31.469 0.000 30.219 1.116 0.000 65.375 660.500 44.781 0.900 Z1.~34 1.043 0.000 34.875 635.500 6.617 0.000 142.500 1.049 0.000 64.625 644.500 9.773 3.300 96.813 1.199 0.000 28.594 651.500 TT3.5HC TENS.~HC SPHI. BHC ILO.gTE IMQF.DTE GR.DTE HTEN.DTE TT3.BHC TENS.~HC SPHI.~HC ILO.OTE IMQF.DTE GR.DTE HTEN.DTE TT].BHC TENS.SHC SPHI.~HC ILD. DTE IMQF.OTE GR.OTE HTEN.DTE TT3.BHC TENS.BHC SPHI .BHC ILD.DTE IMQF.DTE GR.DTE HTEN.OTE TT3.SHC TENS. BHC SPHI.BHC ILD.3TE IMQF.DTE GR.DTE HTEN.OTE TT3.BHC TENS.BHC SPHI.BHC ILO.gTE IM~F.OTE GR.OTE HTEN.DTE TT3.SHC TENS.BHC SPHI.~HC PAGE: 0.001 545.000 26.732 11.867 0.000 43.375 655.000 0..000 595.000 9.738 22.625 0.000 66.053 667.000 0.001 8~5.000 29.775 28.422 0.000 65.375 660.500 0.000 960.000 10.955 41.219 0.000 34.875 635.500 0.001 1275.000 20.037 6.504 0.000 64.625 644.500 0.001 945.000 16.479 13.Z66 2.000 28.594 651.500 0.000 1000.000 7.210 .IS TAPE VER!F,ICATZDN LIS'TING SCHLUMBERGER ALASK~ COMPUTZNG CENTER 2B-~EB-lg90 16:18 PAGE: ~g~ FILE TRAILER ~g~ FILE NAME :ED[T .001 SERVICE : FLi[C VERSION : 001A04 DATE : 90/02/28 MAX REC SIZE : :1024 FILE TYPE : LO LAST FILE : SERVICE NAME : EDIT DATE : 90/02/Z8 ORIGIN : FLIC TAPE NAME : '73~580 CONTINUATION ~ : 1 PREVIOUS T~PE : COMMENT : ~MOC:D, GRANITE POINT STATE 1T587 #6, API ~0-833-100~4 ~ REEL TRAILER ~ SERVICE NAME : EDIT DATE : 90/02/28 ORIGIN : FLIC REEL NAME : 73689 CONTINUATION '# : PREVIOUS ~EEL : COMMENT : AMOCO, GRANITE POINT STATE 1758'? ~6, API #50-833-10034 PROGRAM: LZSCAN Sterl of execulion: Tu:e REVISION' 5.1 6 FEB 90 4:01m PART NUMBER;. WS790-PE32 **** REEL HEADER **** LIS 89/12/12 ATLAS 01 "LIS CUSTOMER ~ORMAT MICROFILMED RECEI.VED **** TAPE LIS 89/12/12 HEADER **** 4104 01 'OPEN HOLE-DIFL, CD/CNL POR.& RAW DATA: 10676-3900 FT' FILE # I **** FILE HEADER **** MAIN .001 1024 CN : AMOCO PROD. CO. WN : GD 17587 NO 6 FN : GRANITE POINT COUN : KENAI STAT : ALASKA FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 10 CURVES : NAME COD 1 GR 68 2 RFOC 68 3 RILD 68 4 RILM 68 5 SPD 68 6 CHT 68 7 TTEN 68 E SAMPLE# UNIT I AP1 1 OHMM 1 OHMM 1 OHMM I F/MM 1 LB 1 LB BYTES 4 4 4 4 4 4 /, 10 TEMP 68 I DEGF 4 * D~TA RECORD DEPTH SPD TEMP 10669.000 -999.2500 -999,2500 10619.000 35,99640 0.0000000 10569.000 35.09538 0.0000000 10519.000 34,99651 0,0000000 10469.000 34.79829 0.0000000 10419.000 53,31500 0.0000000 10369.000 57.59470 0.0000000 10319,000 55.42879 0.0000000 10269,000 59.97552 0.0000000 10219.000 59.55850 0.0000000 10169.000 59.35504 0.0000000 10119.000 59.17062 0.0000000 10069.000 61,42883 0.0000000 10019.000 (TYPE# GR CHT -999,2500 -9.0.9,2500 46.47397 -11 498 45,28250 -11498,85 62.78705 -11498,85 64.37898 -11498,85 51,25795 -11498,85 57.11742 -11498.85 49,54526 -11498,85 97.27559 -11498.85 45,05653 -11498,85 48.68057 -11498.85 44.91173 -11498.85 55.85030 -11498,85 57.91226 O) 1018 BYTES * R FOC TTEN -999.2500 -999,2500 19.57413 5246,168 41,38382 5263,910 24,99634 5268,945 17,17337 5255,492 8,025187 5373,008 15,34405 5323.750 8,580837 5273,520 16.80473 5220.184 7.698462 5211.391 36,72604 5190,070 30,24973 5124.664 9,532454 5103,781 69.72906 5009.121 RIL, O CILD -999,2500 -999,2500 13.80700 72.43269 30,47383 32,81549 16.31189 61,30521 12,25935 81,57068 7,335630 136,3230 12,58864 79,54431 6,924644 144,4119 12,73406 78,52963 6.940559 144,0807 23,24826 43.01959 17,79967 56.23293 9.255823 108.0451 35.91818 27,84683 RILM SP -999,2500 -999.2500 14.998:21 30.62810 35.30510 -41.26039 16.22530 33,14499 12.54673 29.9'3623 8,164068 26,64737 12,43098 25,441 54 7,360611 27.26711 13,13702 17,23856 7,669972 11 .81357 27.90771 8.833797 20.96552 13.22251 9.329035 13,28616 39.21480 5.763318 9969,000 63,87096 0.0000000 9919.000 63.58527 0.0000000 9869.000 56.67061 0,0000000 9819.000 55.97952 0.0000000 9769.000 57.51421 0,0000000 9719,000 56.98914 0.0000000 9669,000 56.99429 0.0000000 9619.000 58.76624 0.0000009 9569.000 5Q.63713 0.0000000 9519,000 59,99400 0.0000000 9469.000 59.89748 0.0000000 9419.000 59,91121 0.0000000 9369.000 61,05969 0,0000000 9319,000 61.05347 0.0000000 9269.000 61.81696 0.0000000 9219.000 55.50481 0.0000000 95.b4233 -11498,85 63,78946 -11498,85 83,93726 -11498,85 70.67175 -11498,85 74,90805 -11498.85 57,59605 -11498,85 72,90688 -11498.85 81,23537 -11498,85 67,92680 -11498.85 87,00591 -11498,85 45.90216 -11498,85 65.75185 -11498,85 49,74965 -11498,85 57,19385 -11498.85 48,92816 -11498,85 71,86536 -11498.85 19,83521 4964,652 13,86118 4916.703 34.66867 4831,965 21 .31813 4859,926 17.69206 4778.367 10.99987 4857.305 10,14851 4823.160 12.89870 4725.898 12,88613 4717.129 48,1010'1 4677,484 I 6.4.51 54 4701.672 8. 501 881 4625,215 20.019.03 4561,895 20,58464 4534,809 25.39848 4502,699 11.06733 4523,035 15,76398 63,43784 10,31985 96,97075 19.74367 50,65207 16.88986 59,20821 I 5. 97401 62,60466 13,65176 73,2680:S 10.20825 97,97340 9,831369 101.7166 10,99115 90,98900 26,89136 37,18666 13. 451 76 74.17453 8,944681 111.7983 17,57248 56. 90843 18.35777 54.47311 19.85696 50.36024 10,33467 96,76317 16.594~.8 10,81591 9,852409 16.98655 21.90587 S,175776 17.643t3 10.24270 20,643S3 -0,1220893 13.77225 3,447293 11.34694 7.975064 9,95435~ 10.15708 12,25714 7.508724 26,69177 5.486768 15.56775 -10.5:8498, 10.40079 10.29903 19.80095 -20,53909 19.82262 -27. 2051 8 23.18115 -16,10838 10.69577 7.885414 53,09227 0.0000000 9119,000 55,99442 0.0000000 9069,000 55.49553 0,0000000 9019.000 57.09420 0.0000000 8969,000 58,03580 0.0000000 8919.000 58.98932 0,0000000 8869.000 59.93074 0.0000000 8819.000 58.07382 0.0000000 8769.000 58.99411 0.0000000 8719,000 5Q.9~400 0.0000000 8669.000 55.64941 0.0000000 8619.000 55.13931 0.0000000 8569.000 55.82587 0.0000000 8519.000 56.18669 0.0000000 8469,000 56.12537 0.0000000 8419.000 58.10539 0.0000000 8369.000 -11498.85 92,73593 -11498.85 46,24727 -11498,85 87.58504 -11498.85 98,92346 -11498,85 33,90424 -11498,85 61.53139 -11498,85 60.34866 -11498.85 89,87625 -11498.85 76,14824 -11498.85 95.84064 -11498.85 33.32332 -11498.85 71,71690 -11498,85 35.04408 -11498,85 89.74223 -11498,85 44.16199 -11498.85 47.76577 4657.426 10,69032 4467,418 23,48688 4348.910 17.88411 4337.594 8.667946 4301,875 45,55290 4276,133 8,712820 4289,645 7,456096 4323,039 13,01760 4284.004 22,41693 4275.461 16,29707 4166.113 60.57199 4149.551 32,63852 4151.043 105,0902 4084,266 18.44070 4112.711 157,7494 4023,448 28.98506 99,88817 7,001049 142,8443 23,67444 42,24716 12.20137 81.98857 7.774057 128,6330 31,15448 32.13106 8,217184 121.6999 6.532161 153,0916 10.83188 92,32120 25.20758 39,67062 12.80972 78.06577 65.04457 15,37992 23,35574 42.81953 91.17249 10,96974 15.49811 64,52443 86,30681 11,58659 20,32913 7,754539 11.21191 29,20126 -31.80165 10,66128 2.351168 7.850110 -1.302155 31. 08037 -10.87422 8,575113 2,171046 7,034555 0,6722122E-01 10.82830 0 ~.~93994 24.67053 -22.52693 12.91862 -14.36830 69.06461 -15.91373 27.50185 -38.77385 101.9230 -23.07770 15,98684 -12.42566 98,59642 -27.41501 26'49269 8319.000 57.,~4544 0.0000000 8269.000 57.99420 0.0000000 8219.000 57.15295 0.0000000 $169.000 57.19846 0.0000000 8119.000 57.99420 0.0000000 8069.000 57.10033 0.0000000 8019.000 59.08957 0.0000000 7969.000 61.37221 0.0000000 7919.000 61.92021 0.0000000 7869.000 61.87337 0.0000000 7819.000 62.57761 0.0000000 7769.000 62.99924 0.0000000 7719.000 63.59006 O.O00000O 7669.000 64.64397 0.0000000 7619.000 66.94748 0.0000000 7569.000 64.05595 0.0000000 52.13240 -11498.85 84.81169 -11~,98.85 90.15112 -11498.85 99.95369 -11498.85 105,8013 -11498.85 101.3981 -11498.85 99.78062 -11498.85 38.53110 -11498.85 47.51331 -11498.85 59.23010 -11498.85 69.48872 -11498.85 70.61438 -11498.85 63.98767 -11498.85 53.90666 -11498.85 48.44858 -11498.85 47.85287 -11498.85 127.4803 4014.239 15.65486 3969.348 13.50912 3992.060 8.190168 3996.805 11.82438 3988.208 6.014649 3949.316 9.267992 3846.533 36.65668 3758.025 20.24023 3733.415 5.338613 3808.485 9.289858 3776.533 11.92619 3705.731 10.05858 3724.002 13.67172 3672.525 28.55063 3577. 328 15.56950 3632.541 89.33055 11.19443 17.50690 57.12038 13.50968 74.02220 6. 881058 145.3312 12.06162 82.90785 3.684857 271.3809 7.269905 137.5595 26.98242 37.06116 15.72184 63.60661 4.023005 248.5716 7.894860 126.6652 10.99954 90.91330 10.19075 98.12823 13.32541 75.04602 40.49875 24.70618 t4.51961 68.87248 95.48862 -42.03133 18.05861 -0.3418010 14.50519 0.1238597 6.985089 3.277918 12.67111 -0.4864546 3.752233 -1.967875 7.643774 3.085833 31.53767 -~2.97101 19.63129 -47.12888 4.116984 -3.299349 ?.84154~ -4.221426 11.89818 -6.694668 t0.64552 -15.23136 1~0. 07908 -5.339514 51,9'3205 -7.946515 I 6. 34337 -32.67754 63.92885 0.0000000 7469,000 64.19133 0,0000000 7419,000 64,06857 0,0000000 7369,000 66.81883 0.0000000 7319.000 65.58612 0,0000000 7269.000 6~.61919 0,0000000 7219.000 68.70332 0.0000000 7169.000 68.Q2636 0.0000000 7119.000 66.46393 0,0000000 7069.000 65.84825 0.0000000 7019,000 6~,64412 0,0000000 6969.000 71.35918 0.0000000 69t9,000 72.37459 0.0000000 6869.000 72.68858 0.0000000 0819.000 72.02823 0.0000000 6769.000 73.41747 0.0000000 6719.000 -11498,$5 98.19527 -11498,85 74.56386 -11498,85 98.24248 -11498.85 49.78772 -11498,85 84.69719 -11498.85 56,94740 -11498,85 62,41937 -11498.85 56,25421 -11498,85 65,20137 -11498.$5 61,46130 -11498.85 57,10686 -1t498,85 61,09404 -11498.85 75,18796 -11498,85 69.80457 -11498.85 55,58495 -11498.85 74,71432 3634,335 11,67048 3551.351 9.420673 3567.S17 10,33703 3574.538 8.279633 3523.911 6.891402 35115,272 10.98172 3475.584 8.048336 3457,201 6,696953 3440,641 7,543760 3445.567 15,15544 3444,834 7.647135 3356,296 8,091187 3323.198 8.298466 3260,908 8,086205 3310.452 9,491442 3222.303 8.852779 3276.703 I 26,1 769 9.606199 104,1002 8,870304 112,7399 10,90177 91,72865 8.582724 116,5167 7.302916 136,9326 9,038010 110,6438 8,721529 114,6591 6,045550 1'65,4164 6.238512 160,2949 10,29721 97,11856 6,064937 164,8857 6,456445 154.$862 4,795919 208,5106 8,772219 113.9964 1 2.64404 79,09529 6.713984 148.9429 0.7773807 9.601141 2.328958 8,414200 ! ,646022 10.44523 !,144528 8,23.o. 521 -0,2800733 7.028435 -1.125557 ~,744398 4.551122 8.192955 -4,004842 6.121943 1.530912 5.797071 4,533240 10, 21679 -1,926748 6,225919 -8,085653 6,344107 -5,101942 4.856649 8.700459 8.437105 I ,784909 12.56148 3.141831 6,414310 4,416288 6669,000 74.86549 0,0000000 6619,000 76.40617 0.0000000 6569.000 5~.14000 0.0000000 6519.000 50.99490 0.0000000 6469.000 54.00098 0,0000000 6419.000 58.64911 0.0000000 6369.000 57.42747 0.0000000 6319.000 57.37912 0.0000000 6269.000 57.99420 0.0000000 6219.000 56.99429 0.0000000 6169.000 55.99442 0.0000000 6119.000 54.20270 0.0000000 6069.000 55.95280 0,0000000 6019.000 56.95869 0.0000000 5969.000 58.12462 0.0000000 5919.000 58.~6655 0.0000000 73.04794 -11498,85 62.16071 -11498,85 45,60167 -11498,85 80.94682 -11498,85 52.17552 -11498.85 50,95851 -11498.85 43.80045 -11498.85 74.46707 -11498.85 71.91696 -11498,85 48.87881 -11498.85 47.15143 -11498,85 46.40552 -11498,85 66.53447 -11498,85 $9.39336 -11498,85 93.84868 -11z, 98.85 57.92126 -11498,$5 7,959513 3244,847 12.70445 3113,077 15.154:09 3000.356 10,49600 3025,868 18.97421 3034.375 21.43930 2949.688 10.92924 3008,b51 9.102581' 2948.176 12.88204 2987.152 10,01972 2863.069 7,732310 2847.527 8.731030 2901,240 1 2,30803 2883,684 9.517620 2861,790 7,884929 2789,307 14.48473 2739,264 7,714521 129,6272 t0,31907 96. 93457 14.30729 69,89444 10,536t8 94,91214 19,27769 51,87350 216.95575 37.12408 11.28590 88.60620 8.173920 122.3419 16.33910 61,21194 11.76322 85.01080 8,300251 120,4784 8,773308 113,9821 14,18977 70.48Z$8 9.943110 100,5727 8,361893 119.5908 12.18813 82,05486 7,540852 14.97145 8.953596 -2.208138 15,66896 -15.87857 10.30585 13,05386 t9.38147 -21,18182 23,64372 -10.89979 12.70701 5.045726 7,864385 12,29181 14.70695 12,24311 11.91555 9,691994 7.996879 13,13480 8,629004 11,25930 10.95761 1t.07229 9,911707 13,90025 8,224524 11,92672 10.57668 10.26587 59.95239 0.0000000 5819.000 59.25046 0.0000000 5769.000 56.91364 0.0000000 5719.000 58.99411 0.0000000 5669.000 59.08221 0.0000000 5619.000 57.94250 0.0000000 5569.000 59.06439 0.0000000 5519.000 61.99326 0.0000000 5469.000 59.06532 0.0000000 5419.000 60.93408 0.0000000 5369.000 64.99352 0.0000000 5319.000 63.33~70 0.0000000 5269.000 55.Q92~6 0.0000000 5219.000 58.01161 0.0000000 5169.000 57.71434 0.0000000 5119.000 55.53606 0.0000000 5069.000 -11~,98.85 64.92601 -11498.85 24.84444 -11498.85 39.68025 -11498.85 45.68610 -11498.85 69.14821 -11498.85 91.77975 -11498.85 82.81032 -11498.85 95.34262 -11498.85 70.48842 -11498.85 69.31572 -11498.85 24.03981 -11498.85 43.71008 -11498.85 44.76674 -11498.85 58.98891 -11498.85 55.84769 -11495.85 43.86945 2774.229 7.857868 2687.926 54.94006 2653.867 15.62291 2647.476 10.99004 2577.507 9.530715 2660.818 8.702950 2598.662 7.760774 2483.749 8.031082 2031.150 10.74646 2495.796 9.605219 2361.559 17.20464 2377.301 10.23504 2337.430 10.81290 2266.408 9.205305 2316.964 11.01851 2329.698 12.53756 91 .95767 8.485796 1t7.8440 64.26207 1 5 · 561 83 15.22~43 65.70250 10.87465 91.95697 8,558739 116.8397 9.736219 102.7094 7.408746 134.9793 8.445927 118.4003 10,59694 94.36693 9.228725 108.3597 76.65446 13.05391 13.42t41 74.52701 10.37036 96.42871 9.510050 105.1'530 11.72351 85.30037 26.13805 -1.018,136 7.756616 7.333724 78.80530 12.47406 13.99881 22.033~9 10.87202 3.651983 7.905164 1.779765 9.03771~ 5.200719 7,0~,2353 ~.046215 7.624955 3. 228877 9.719990 2.539515 8.160196 6.068818 49.71371 17.13203 15.97888 21. 9701 8 11,01948 21.02220 9.033058 13.25288 10.65431 7.339345 14.62611 14.7~385 5019.000 57.23010 0.0000000 4969.000 56..~6605 0.0000000 4919.000 60.23372 0.0000000 4869.000 57.36632 0.0000000 4819.000 56.66455 0.0000000 4769.000 58.42078 0.0000000 4719.000 5~.45958 0.0000000 4669.000 59.21021 0.0000000 4619,000 59.99364 0.0000000 4569.000 5~.97362 0.0000000 4519.000 61.64757 O.OOOO000 4469.000 63.15038 0.0000000 4419.000 62.99655 0.0000000 4369.000 64.36818 0.0000000 4319.000 66.35402 0.0000000 4269.000 65.63640 O.O000000 44.52754 -11498,85 53.74713 -11498.85 58.63095 -11498.85 34.49617 -11498.85 67.75880 -11498.85 60.90665 -11498.85 63.37456 -11498.85 72.30568 -11498.85 64.40759 -11498.85 66.61015 -11498.85 53.71439 -11498.85 66.30518 -11498.85 71,85301 -11498.85 70.24811 -11498,85 65.63490 -11498.85 45.05875 -11498.85 10.35825 2336.268 8.332853 2290.655 13,72889 2238.043 20.49757 2258.135 11,88474 2263,332 16,79359 2170.031 17.56786 2140,545 13.39387 2i45.987 9,712448 2108.954 11,28942 2148.660 8,549685 2113.848 13.08212 2074.231 12.62890 2054.244 7,569295 2042.446 7.599706 1951.395 8.865259 2017.091 10.37-.803 96,35741 t17.5519 14.33125 69,78838 27,07149 37.00815 11.67863 85.62840 21.42792 46.71068 16.17079 61.84563 14,81890 67.48140 9,988083 100,1193 14.90071 67.12373 9,940264 100.6028 18.20384 54.93582 I 3. 23694 75,58420 9,066628 110.2948 7.817050 127,9257 11.80858 84.69052 9.995527 2Z.49559 ~,113323 24.21991 12.11067 11.79180 19.39977 17.18375 11,06998 12.61728 16,08939 7.621407 15,12311 10.32729 13.46108 35.70085 8.902939 30.73740 12.72640 32,40678 8,875423 47.90645 17.68625 45.42644 10,41511 42,09567 8.171860 49.63634 7.129544 51,83302 10,16839 48.97583 63.54095 0.0000000 4169.000 65.02910 0.0000000 4119.000 66.85641 0.0000000 4069.000 67.73505 0.0000000 4019.000 67.5762~ 0.0000000 3969.000 68.99310 0.0000000 3919.000 0.0000000 0.0000000 -11498.85 68.18069 -11498.85 44.51749 -11498,85 74.94429 -11498.85 65,53981 -11498.85 61.18031 -11498,85 41.91847 0.0000000 2008.364 11,70522 1965,476 12.61387 1886.020 7,065245 1915.004 11.92663 1894.245 8.218855 1804.446 0.2000000 2000.000 102.0165 11.93050 83.81880 15.58726 64,15503 6.688699 149.5085 11,04454 90.54286 9,170267 109.0481 0.2000000 0.0000000 47.32358 10,55679 41.65480 !3. 67633 37,98489 6.014709 29.64148 10,33410 16.97845 9.498878 -92.52321 0.2000000 -80.00000 TOTAL DATA RECORDS STARTING TAPE DEPTH FILE TRAILER **** : 589 = 10669.00 ENDING TAPE DEPTH = 3900.00 FILE # 2 HAIN .002 **** FILE HEADER **** 1024 FORMAT ONE OEP RECORD (TYPE# 64) TH PER FRAME TAPE DEPTH UNIT : F 13 CURVES : NAME CODE SAMP I GR 68 1 2 $S0 68 1 3 LSD 68 1 4 CAL 68 1 5 DEN 68 1 6 SPD 68 1 7 CHT 68 I 3 TTEN 68 1 9 CORR 68 1 10 LSN 68 1 11 SSN 68 I LE# UNIT APl: CTS CTS IN GMCC F/MM LB LB GMCC CTS CTS BYT~S~ 4 4 4 4 4 4 4 4 4 4 * D/~T/~ RECORD (TYPE# O) 1014 BYTES: * DEPTH DEN LSN 10600.000 2.000000 0.0000000 10550.000 2.488938 119.5179 10500.000 2.499888 48.81641 10450.000 2.564307 56.34801 10400.000 2.5,56442 127.6187 10350.000 2.721492 204.4159 10300.000 2.694848 54.68550 10250.000 I .399198 18.12180 10200.000 2.549403 73.86191 10150.000 2.552356 73.30989 10100.000 2.5447O9 65.35361 10050.000 2.528348 53.32851 10000.000 2.658199 62.02982 9950.000 2.626327 GR SPD SSN 0.0000000 0.0000000 0.0000000 56.34068 27.99721 240.8720 75.69666 27.00320 155.2331 86.34764 27.99721 172.6995 39.29677 27.99721 248.0032 34.12244 27.99721 349.8459 72.47026 27.99721 184.2984 24.84682 27.99721 106.5136 58.61101 27.99721 189.7851 54.71361 27.99721 205.0605 63.40414 27.99130 192.6776 63.72527 27.99721 167.0097 74.28099 26.99730 186.2323 63.10782 26.99730 SSO CHT CN 0.0000000 0.0000000 0.0000000 117.1720 -11498.85 13.09818 148.5669 -11498.85 27.554~95 102.6987 -11498.85 26.08159 94.91281 -1t~98.85 12.221t8 88.12781 -11498.85 9.424244 93.92291 -11498.85 30.04713 238.5004 -11498.85 92.62007 111 . 8669 -11498.85 19.89801 108.3037 -11498.85 22.71825 11~.5381 -11498.85 24.60713 109.3971 -11498.85 26. 93486 100.8188 -11498.85 25.28857 102.8320 -11498.85 LSD 'TTEN CNG 0.0000000 2000.000 0.0000000 60.63690 5936.1 91 17.09818 82.56322 6175.$13 31.55495 46.68890 5914.094 30.08159 41.4;51 81 5916.969 16.22118 31.33121 5898.875 13.42424: 34.93900 5939.578 34.04713 652.4063 5826.125 96.62007 52.73080 5792.1!41 23.89801 50.36690 5755.043 26.71825 57.38971 576~.008 28.60713 52.75490 5861:,594 30.93486 39.87660 5843.422 29.28857 42.67891 5712.430 C~L CORR 10.00000 -0.2500000 12.15543 0.3613091E-01 13.30683 0.1814384 13.1;4733 -0.1847267E-02 13.10694 -0.31 27289E-01 12.75486 -0.1754284E-01 12.78412 O. 3050804E-02 14.26668 -0.2400303E-01 13.34160 0.3604507E-01 14.06262 0.1906395E-01 14.04114 O. 6817627E-01 1 3. 94892 0.1513290E-01 11.97664 0.2369881E-01 12.38761 O. 2125454E-01 9900.000 2.649869 66.72171 9850.000 I .492516 20.81041 9800.000 2.414360 44.29701 9750.000 2.476720 97.09290 9700.000 2.663701 130.1295 Q650.000 2.633739 65,42841 9600.000 2.335917 41.84370 9550,000 2.611408 57.65590 9500.000 2.661587 76.05382 9450.000 2.599344 87.62421 9400.000 2.613894 56.76311 9350.000 2.439587 45.06061 9300.000 2.453063 108.8630 9250.000 2.570062 79.62660 9200.000 2,619401 50.87241 9150.000 2.532207 43.37341 72.69150 26.99730 205.0692 40.93648 27.99721 103.8626 68.17960 27.43921 147.7853 58.19412 27.99721 232.5756 52.47?39 27.99721 2~5.5232 76.73134 28.99710 19~.5125 68.77449 25.99710 147.1979 70.89511 29.96130 172,5792 100.9914 29,99701 213.z~284 75.37619 29.99701 211.4134 68.25066 29.99701 179.1638 97.39787 30.99100 156.3457 48.18364 30.99690 246.8260 87.42368 30.99100 211 . 501 3 77.77249 29.99701 174.9900 110.1642 30.03860 159.6410 98.76550 -11498.85 26,19135 235,4182 -11498.85 60.00989 166.6979 -11498.85 29.59663 121,2252 -11498.85 17.75426 101.3875 -11 498.85 15,28381 101.3184 -11498,85 25.88405 154.7852 -11498.85 32.04701 134.4281 -11498.85 25.17441 101.4679 -11498,85 22.83162 115,0094 -11498.85 17,96745 115.9643 -11498,85 27,25104 134:.6215 -11498.85 31.3.8774 132.1370 -11498.85 16.18094 112.8042 -11498.85 20,96912 129.53t8 -11498,85 30,95199 129.6748 -11498.85 34.34050 39.44290 5731.6t3 30.19135 560.6887 5639.887 64.00989 107.6194 5613,734 33.59663 64.49712 5502,3?9 21.75426 39,90300 5577.262 19.28381 4t,53549 5548.609 29,88405 107.4940 5426.473 36,04701' 62.55980 5421.758 29,17441 40.05341 5367,234 26.83162 51.39052 5388.504 21.96745 51.02011 5279.758 31.25104 77.95850 5223,105 35,38774 71.92952 5054.203 20.18094 51.951 80 5126.156 24.96912 58.88380 5351.336 34.98199 65,87411 5265.176 38.34050 12.1 3630 0.1062393E-01 21. 50705 0.3651619E-02 13,55790 0.2108898 11.84093 0.5072021E-01 13.29017 O. 29511 45E-01 13.43435 0.1689816E-01 15,20625 0,1316233 15.47176 0,1726751 14.68723 O. 290~412E-01 15,29274 0.7495360E-01 14,35346 0.8644295E-01 13.37158 0.9592152E-01 11.67801 0.1045446 13.32626 O. 5030918E-01 1 5. 00696 0,1543522 1 5. 68101 0.1156197 21.696,$1 11 9.9118 77. 50282 81 . 50282 9O5O.O0O 2.414529 93.63831 9000.000 2.638346 59.9901 0 ,~950. 000 2.448267 56.46240 8900.000 2.481221 87.51810 8850.000 2.544852 63.91060 8800.000 2.570957 61.29060 8750.000 2.054279 30.44350 $700.000 2.580701 135.6789 86S0.000 2.535919 71 .55151 8600.000 2.583233 62.64722 8550.000 2.584512 77.68431 8500.000 2.620370 49.15891 $450.000 2.624091 53.99240 8400.000 2.547605 65.34959 8350.000 2.696203 71.28090 8300.000 1.482132 47.77940 27.99721 215.3326 97.88200 26.99730 190.1096 69.28661 27.59691 169.9636 49.02347 27.40350 215.4798 73.65234 27.56120 199.8408 66.29732 28.00310 182.5908 90.98242 27.99721 135.7753 64.73544 27.59100 266.4294 75.23709 27.55530 198.6804 95.23387 27.59100 186.1710 86.76192 28.55521 209.3670 95.44305 28.56110 165.7725 95.52251 28.03290 179.2938 81.05200 27.43330 185.3444 79.82039 27.99721 204.5456 35.19768 27.55530 136.9108 -11498.85 16.57755 11 3.21 67 -11Z, 95.~5 27.41417 135.7986 -11498.85 25.38850 I I 8.9354 -11498.85 18.57520 109.4074 -11498.85 26.87289 115.7670 -11498.85 24.99574 157.7656 -11498.85 47.49704 111.8473 -11498.85 12.46875 128.5378 -11498.85 22.46417 103.8449 -11498.85 24.90294 105.11.63 -11498.85 21.45108 104.0073 -11498.85 30.07413 102.4285 -11;498.85 29.39149 119.9936 -11498.85 23.20444 101.4970 -11498.85 23.62112 206.7628 -11498.85 82.34329 5(]35.445 20.57755 47.87511 5065.~32 31.41417 78.021.59 4944.277 29.38850 62.48979 5032.410 22.57520 51.49510 5016.484 30.87289 53.75351 4951.082 28.99574 158.2562 4882.543 51.49704: 50.66499 4770.555 16.46875 64.78479 4821.203 26.46417 45.96301 4868.711 28.90294 46.49271 4708.430 25.45108 43.64650 4617.711 34.07413 42.63541 4647.430 33.39149 58.13510 4653.15Z, 2.7.20444 38.34641 4564.227 27.62112 493.8174 4644.191 _~R. 77089 11.65903 O. 9457302E-01 14.39235 0.8330917E-01 !t .06073 0.1049891 14.67966 0.41 47720E-01 15.76100 0.2116203E-01 14.98366 0.6604385E-0i 14.45619 0.1718616E-01 13.26504 0.5007744E-01 12.81 379 0.1120920 14.05790 0.1028824E-01 13.09443 0.i653290E-01 14.46516 0.2502537E-01 13.85040 0.1857758E-01 12.99765 0.7669735E-01 13.50174 0.4482841E-01 18.42023 -0.61 77330E-01 8250.000 2.610324 60.61751 8200.000 2.622173 63.41470 8150.000 2.522568 39.22990 8100.000 2.543489 43.65480 8050.000 2.621783 80.05920 8000.000 2.606257 68.61800 7950.000 2.430069 93.52679 7900.000 2.469970 84.66161 7850.000 2.614594 56.16319 7800.000 I .619864 21. 72931 7750.000 2.507299 161.7117 7700.000 2.533865 68.89200 7650.000 1.557597 22.73360 7600.000 2.643360 53.91501 7550.000 2.491063 84.27600 7500.000 2.601060 7&.56891 95.58508 27.99721 189.6591 101 .0700 27.99721 187.9689 99.44165 27.99721 15t .2391 100.3043 27.9,0721 158.2236 99.54562 27.99721 223.3138 85.04179 28.03290 197.0033 49.89725 28.40340 219.9932 71 .27031 29.59669 224.5265 78.96117 28.39751 186.8995 4~.81450 29.39740 112.3308 47.92473 29.99110 352.7061 70.48143 28.96140 205.9409 38.58453 30.95531 117.5889 95.19934 29.99701 167.6248 69.71503 29.99701 216.0744 99.98912 30.55501 211 .6306 !05.2365 -11498.85 26.89729 106,3478 -11498.85 24.80704 t20.2564 -11498.85 36.93105 126.8392 -11498.85 33.53703 111.6869 -11498.85 22.62100 114.7818 -11498.85 23.63916 122.1484 -11498.85 17.22328 127.1470 -11498.85 20.91818 112.6621 -114~98.85 29.4,8489 217.5551 -11498.85 65.20224 109.7764 -11498.85 15.12372 112.8780 -11498.85 25.12477 231 .0936 -11498.85 65.29198 117.9402 -11498.85 26.64484 120.3146 -11498.85 1 9.82 933 114.9075 -11498.85 23.22758 44.91801 4'594.629 30.89729 44.883~1 4594.305 28.80704 60.19121 4594.016 40.93105 63.01530 4537.277 37.53703 47.99681 4625.008 2~6.62100 50.80450 4395.512 27.63916 69.06241 4234.270 21.22328 69.40730 4290.688 24.91818 49.01230 4547.160 33.48489 426.3967 4315.973 69.20224 54.62030 4204.031 19.1237Z 54.44270 4334.422 29.12477 499.2578 4079.397 69.29198 50.28830 4134.008 30.64484 62.68840 4105.809 23.82933 51.1 5842 4159.137 27.22758 15.43829 O. 2743244E-01 14.85766 O. 3899765E-01 16.46759 0.6668472E-0i 15.93115 0.1076403 16.35550 O. 6778431 E-01 13.52146 0.7693481E-01 11.36070 0.3454113E-01 12.78554 0.7586765E-01 16.96638 O. 6967735E-01 16.13153 0.1233482E-01 15.02035 O. 9144783"-02 15.32642 0.3434658E-01 15.52256 0.1843929E-01 15.48667 0.1097412 14.49595 0.5273914E-01 16.77678 0.7563972E-01 75.01300 I 87. 0861 18,96 840 22. 96840 7400.000 2.440542 69.45430 7350.000 2.529779 51.34160 7300.000 2.482706 66. 72211 7230.000 2.453444 67.99281 7200.000 2.569287 65.05600 7150.000 2.546158 104.0075 7100.000 2.503342 65.?4930 7050.000 2.561216 59.86711 7000.000 2.487185 73.03831 6950.000 2.277306 44.83661 6900.000 1.369528 20.47520 6850.000 I .492164 25.64281 6800.000 2.534952 69.94400 6750.000 2.517856 91.18831 6700.000 1.365474 19.86909 6650.000 2.530329 66.97772 30.99690 198.3543 71.74353 30.00290 177.4348 63.25801 31.39720 193.2097 52.33803 30.00290 187.9327 69.05440 31.99680 197.1043 29.35675 30.59660 278.7615 66.09747 30.99690 196.4819 72.52702 30.43890 187.6886 53.65573 30.96120 194.4795 70.00383 29,43900 172.1977 24.31673 31.99680 106.3657 26.79082 31.03261 117.5689 65.15741 32.99670 208.6882 .55.80528 32.59050 232.6868 26.50720 33.96091 108.8157 6 ~0.17789 33.59630 1 -1 2 1 -1 3 1 -1 2 1 -1 2 27.6 1498 3.45 19.7 1498 1.20 12.2 1498 3,94 32.0 1498 2.30 107.1 -11498 25.63 11 -11 21 11 -1t 25 12 -11 26 15 -11 21 13 -11 36 0.5 498 .26 9.7 498 .11 6.1 /,98 .97 498 .05 '9.7 498 .70 230,3 -11498 =65.98 2 -1 5 1 -1 2 t -1 1 2 -1 7 1 -1 05.1 1498 0.10 15.0 1 4,98 5.05 22.2 1498 9.67 33.4 1 4.98 5.60 13.9 1498 .85 O27 451 .85 131 678 .85 849 059 .85 586 049 .85 599 895 .85 663 432 .85 241 554 .85 8O9 965 ,85 003 842 .85 778 270 .85 546 993 .85 677 891 .85 309 $85 .85 918 95t .85 649 069 nc;n 72.43950 4078,630 27.~5027 59.29831 3971,803 35.20131 58.04251 3914.991 27.94849 74.58449 3968.545 26,30586 48.53241 3895.729 29,63599 52.12871 .3984,831 25.26663 61.32071 3995.052 29.11241 61.16200 4001,617 30.97809 86.08461 4137.840 25.05003 100.8179 4381.051 40.70778 655,9482 3683.050 69.98546 482.5537 3660.896 54.10677 55.81981 3670.532 29.05309 61,94691 3668.327 23.67918 669.8259 3653.899 79.60649 55.36621 3557.520 ~2.~SN 14.43013 O. 6492901 E-01 14,97326 O. 6742191 E-01 16.11525 O. 1089191 E-01 15.23706 0.9057999E-01 14,98646 0.1991653E-01 15.04249 0.2778912E-01 16,76649 0.5547142E-01 16.86409 0.1124496 16.11465 0,1868563 15.44256 0.4487514E-01 18.15530 -0.51 32580E-01 18,62358 -0.6174183E-01 18,79832 0.4630852E-01 18.21866 O. 7446289E-01 18.23143 -0.4630661E,01 18 6~268 . ~,~ ~ ,~ 0.3811550E-0i 6600.000 2.430592 76.63760 6550,000 2,388996 70,82210 6500,000 2.4~723~ 42.06390 6450.000 2.413338 62,79221 6400,000 2,480882 130,5346 6350,000 2,427110 59,98891 6300,000 2,554059 60,86610 6250,000 2,29Q721 38,3560Q 6200,000 2,404396 100,3769 6150,000 2,420835 72,45560 6100,000 2,467494 86,34021 6050,000 1,361897 21.00Q80 6000,000 2,509200 73,25870 5950,000 2,504416 52,16020 5900.000 2.480711 55,00410 5850,000 1.372524 18.51210 57.42253 133,99071 213,9192 59,90926 28,40930 208,0195 102,7866 26,99730 150,8360 73,33461 26.99730 189,7587 44,92224 27,99721 274,6062 61,65106 28,00310 184,7702 73,73907 27,99721 191,9399 68,$3627 27,99721 161,5533 49,24303 27,99721 255,3306 53,00882 27.55530 203,4404 56,14293 28,96140 227,4841 27,88585 28,99120 111,0840 86,01860 28,59680 213,0927 91,88026 28,40340 I 85,2806 71,13695 28,99710 182,8985 23,20737 28,59680 105.7718 133,6550 -11495'85 2~,64526 137.1258 -11~+98,85 24,46869 !28,1428 -11498,85 32,99335 131,4093 -11 498. !.35 25,53780 117,1725 -11498,85 14,17676 119,3151 -11498,85 26,27501 114,6948 -11498,85 27,21420 135,8559 -11498,85 42,80132 121,3153 -11 498,85 19,58054 126,4198 -11498,85 22,85046 121,9180 -11498,85 20,70421 232,7315 -11 498, 85 68,95361 131,7435 -11498,85 24,11177 130,8092 -11498,85 3~,52225 115,2733 -11498,85 29,45036 216,z, 203 -11498,85 85.13918 78,08571 3459,323 26,64526 85,23740 3318,626 28,46869 67,76210 3446,722 36,99338 77,99811 3492,212 29,53780 61,26091 3250,169 18,17676 67,33490 34 00,447 30,27501 54,22870 3389,268 31,21420 94,26680 3325,482 46,80132 70,90271 3323,717 23,5805¢ 73.30069 3337,544 26,85046 65,76440 3240,172 24,70421 670,9478 32911,278 72,95361 69,30090 3295,097 28,11177 69,05200 3155,854 36,52225 59,92831 3110,024 33,4,5036 609,9714 3107,095 89.13918 t4,53231 0.8759B$OE-01 13,29728 0,8396912E'01 14.74857 0.92800145-01 13,7634t 0.6978703E-01 I 2,03446 0,3249645E-01 t8, i 9757 0,1965618E-01 18.72510 0.5290890E-01 18.72943 0,3814697E-01 18,83643 0,1931858E-01 19,06935 0,5028439E-01 19,01357 0,4992199E-01 1 8,536?4 -0,4915714E-01 18.80688 0.1145878 18,99672 0,1082182 18,82964 O, 2275467E-01 17,10912 -0,7982540E-01 52.1 0770 174. 8652 29. 85670 33.85670 5750.000 2.5~5~09 53.39680 2.428571 55.84090 5650.000 2.493084 105.9749 5600.000 1.375183 17.92270 5550.000 2.511028 50.53780 5500.000 2.551804 49.83360 5450.000 2.483932 40.30811 5400.000 2.440514 56.16170 5350.000 2.440859 55.92021 5300.000 2.533262 53.43291 5250.000 2.408868 61.84581 5200.000 2.509252 189.2944 5150.000 2.251704 69.89720 5100.000 2.436768 60.42439 5050.000 I .769695 23.40100 5000.000 2.649992 72.76282 29.99701 181.0739 64.04756 29.43900 182.8503 44.87918 28.99710 239.2520 21.78647 29.59081 109.7864 87.30016 29.55510 179.4319 83.96506 30.55501 175.5654 95.89052 30.99690 154.8379 70.38873 30.40320 201.2987 69.93640 30.00290 188.5819 81.98891 30.99690 184,0957 47.46098 30.99690 184.4180 42.49628 30.99690 342.2612 45.78641 32.99080 195.0254 66.51822 31.99680 192.7374 60.68227 31.39720 122.0878 46.15663 30.99100 118.3798 -11498.85 30.32695 119.4783 -11498,85 28.78363 122.1384 -11498.85 16.06219 227.4162 -11498.85 105.4556 119.9561 -11498.85 32.49876 129.6197 -11498.85 32 · 11 916 1261.3469 -11498.85 36.71992 125.8277 -11498.85 32.97084 122.7621 -11498.815 30.07632 122.3479 -11498.85 31.05753 126.2420 -11498,85 25.03104 106.1808 -11498.85 10.58427 137,1979 -11498,85 22.63116 118.7626 -11498.85 27.68138 166.0935 -11498.85 66.68773 97.48952 -11498.85 58.72131 3036.362 34.32695 67.29111 3084.521 32.78363 63.81941 3026.319 20.06219 641.5103 2986.688 109,4856 60.87210 2945.333 36.49876 64.21840 2853.289 36.11916 67.60570 2952.563 40.71992 71.03799 3153.444 36.97084 68.66422 2877.045 34. 07632 60.78711 2788.758 35.05753 74.28030 2688.159 29.03104 52.51161 2776.559 14.58427 t01.5694 2576.417 26.63116 66.04840 2600.316 31.68138 254.4665 2603.483 70.68773 38.87761 2718.395 in 17n6~ 18.34761 O. 5857849E-01 16.46562 0.2083492E-01 16.83002 0.6254864E-01 17.79543 -0.5531693E-01 18.12224 0.59992795-01 1!8.11111 0.1242218 18.56992 0.7544067E-01 18.66846 0.56397445-01 18.50615 0.4198551E-01 1~i79454 0.8170891E-01 17.67725 0.4404736E-01 14.44258 -0.5967140E-02 16.90067 0.2240467E-01 17.12781 0.2095413E-01 18.55737 -0.6155682E-01 14.64865 0.4490852E-02 4950.000 2.458619 52.71721 4900.000 1.652851 27.16521 4850.000 2.543583 97.28070 4800.000 2.522003 54.85121 4750.000 2.417049 4~_.86130 4700.000 2.497066 45.26521 4650.000 2.255370 33.22450 4600.000 2.107326 31.73820 4550.000 1.664218 23.03.821 4500.000 2.402478 64.94402 4450.000 2.474654 55.33121 4400.000 1.558904 23.26430 4350.000 2.433061 43.24930 4300.000 2.238234 71.82401 4250.000 2.429017 53.14481 ~200.000 2.37C425 38.02970 62.84824 31.39720 174.4241 43.13927 31.99091 127.0869 64.53548 32.00270 252.6986 72.08630 32.43871 172.6196 73.91946 32.96100 158.2149 68.67302 32.39709 169.1560 77.06039 31.99680 146.9830 64.85695 32.99080 139.5658 47.04678 33.59041 117.8105 59.50407 33.99661 199.0264 67.27727 32.56070 187.2726 57.69806 32.43280 119.3973 72.35767 33.03241 162.7571 37.66792 32.40300 204.1581 63.84940 33.99661 188.1308 63.76811 34.5Q621 157.9208 131.2889 -11498.85 29.23262 215.9558 -11498.85 52.18080 117.1269 -11498.85 20.24565 131.4886 -11498.85 27.13164 134.0630 -111498.85 34.49509 130.5991 -11498.85 31'86703 136.5490 -11498.85 46.77791 147.2225 -11498.85 46.25644 207.5762 -11498.85 63.51656 126.970t -11498.85 26.07793 119.5886 -11 498.85 30.23965 185.1542 -11498.85 64.06879 130.3416 -11498.85 35.54739 165.7920 -11498.85 23.28278 12~6.4926 -11498.85 32.35329 137.6167 -11498.85 40.13435 73.55002 2673.871 33.2326Z 402.9304 2583.233 56.18080 56.54411 2599.917 24.24565 68.00401 2647.028 31.13164 79.76901 2541.440 38.4,9509 69.54709 2484.322 35.86703 100.4996 2427.553 50.77791 135.6919 2451.661 50.25644 379.4272 2347.478 67.51656 75.47270 2411.848 30.07793 63.48380 2448.944 34.23965 373.9575 2323.864 68.06879 75.23141 2291.511 39.54739 133.5890 2573.631 27.28275 72.59991 2269.755 36.35329 87.69562 2188.263 44.13435 0.89697845-01 18.08455 O. 2078819E-01 18.41075 0.6058502E-01 18.24263 0.1192265 18.11739 0.$328247E-01 17.72864 0.1039467 18.39865 0.2148151E-01 17.68243 0.3560066E-02 18.1 ,..8349 0.6108284E-02 18.61044 0.4456234E-01 18.46672 0.4174995E-01 18.12755 -0.7549763E-01 18.44394 0.7387257E-01 17.64075 0.128t15~ 18.41536 O. 5431938E-01 18.49252 0.7769394E-01 /.~n nnn ~Q_n&~R7 162.4024 152.1357 18.63272 28.1 5720 130.6255 51 . Z9531 55.29531 4100.000 55.17017 2.373659 33.40291 55.90631 169.8149 4050.000 65.58818 2.29911 5 32.99670 42.98100 155.8885 4000.000 63.41103 2.400172 33.00261 40.79570 155.8016 3950.000 41.81593 2.201932 33.99661 23.30710 112.2380 129.1652 -11498.85 25.73392 140.6301 -11498.85 33.57237 123.4457 -11498.85 36.38211 44.85861 -11498.85 55.44057 80.13029 2291.419 29.73392 98.87221 2295.569 37.57237 72.85371 2270.640 40.38211 32.09180 2188.004 59.44057 18.4414t 0.4165415E-01 18.35286 0.5829239E-01 15.07379 0.2687836E-01 11.54915 -0.5267029 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 744 10600.00 ENDING TAPE DEPTH = 3912.00 FILE # 3 REPEAT.O03 **** FILE HEADER **** 1024 FORHAT ~ECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DE PTM UNIT : F 10 CURVES : NAME COD 1 GR 68 2 RFOC 68 3 RILD 68 4 RILM 68 5 SPC 68 6 SP 68 7 CHT 68 $ TTEN 68 9 CILD 68 10 TEMP 68 E SAM PLE# UNIT BYTES I AP1 4 1 OHMM 4 1 OHMM 4 I OHMM 4 I F/MM 4 1 MV 4 I LB 4 I LB 4 I MMHO 4 1 DEGF 4 * DaTA RECORD DEPTH SPD TEMP (TYPE# GR SP O) 1018 BYTES * RFOC CHT RILD TTEN R!LM CILD ~nz~ nnn -000 ~nn -o~o_~n;~ -999.25~Q -999.2500 -999.2500 10626.000 41 .07375 45.10471 27.85847 0.0000000 10576.000 45.23419 45.54120 -38.86647 0.0000000 10526.000 28.95222 45.10471 12.15123 0.0000000 10476.000 72.09793 45.75960 31.04910 0.0000000 10426.000 47.36685 0.0000000 22.14888 0.0000000 18.81000 -11498.85 42.36375 -11498.85 133.6075 -11498.85 17.98430 -11498.85 0.2000000 0.0000000 t4.25674 5401.188 29.52130 5338.281 70.32004 5306.230 13.72336 5303.297 7.254849 2500.000 14.47041 70.14224 32.82684 33.87384 39.62430 14.22070 14.57440 72.86844 7.614935 137.8388 TOTAL DATA RECORDS : 24 STARTING TAPE DEPTH = 10676.00 **** .mILE TRAILER **** ENDING TAPE DEPTH 10403.00 FILE # 4 **** FILE HEADER **** REPEAT.OO& 1024 FORMAT RECORD (TYPE// 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT 13 CURVES : NAME CODE SAMPLE// 1 GR 68 1 2 SSD 68 1 3 LSD 68 1 4 DEN 68 1 5 SPO 68 1 6 CAL 68 1 7 CHT 68 1 8 TTEN 68 1 g CORR 68 1 0 LSN 68 1 I SSN 68 1 2 CN 68 1 '3 CNC 68 1 UNIT bPI CTS CTS GMCC F/MM IN LB LB GMCC CTS CTS PCT PCT BYTES 4 4 4 4 4 4 4 4 4 4 4 DEPTH SPD LSN 10599.000 0.0000000 0.0000000 10549.000 27.99721 111.4425 10499.000 24.63290 46.02600 10449.000 28.02701 43.92780 10399.000 0.0000000 106.6770 GR CAL SSN 0,0000000 lO,OD000 0,0000000 45.51491 12.51792 227.5282 74.67445 13.17179 155.0586 97.64684 13.80029 153.3484 40.33264 10.00000 233.7452 SSD CH T CN 0.0000000 0.0000000 0.0000000 114.6599 -11498.85 13.41895 162.2800 -11498.85 30.03091 97.47801 -11498.85 31.67781 0.0000000 O.O00000O 15.24709 LSD TTEN CNC 0.0000000 2000.000 0.0000000 60.07640 5908.004 17.41895 93.40549 5995.602 34.03091 43.93671 5852.469 35.67781 0.0000000 2000.000 19,24709 DEN CORR 2.000000 -0,2500000 2.474999 O. I 81 I 21 8E-0t 2.497201 0.2324257 2.566733 -0.2575111E-01 2.000000 -0. 2500000 TOTAL DATA RECORDS STARTING TAPE DEPTH FILE TRAILER **** 25 10599.00 E:N D IN G TAPE DEPTH = 10383.00 **** TAPE TRAILER **** LIS 89/12/12 4104 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 1398 **** REEL LIS 89/12/12 ATLAS 01 TRAILER **** TOT4L RECORDS IN THIS LOGIC4L REEL : 1399 TOTAL RECORDS IN THIS PHYSICAL REEL: 1399 End of execution: Tue 6 FEB 90 4:07D Elapsed execution ~ime : 5 minutes, 33.0 SYSTEM RETURN CODE = 0 PROGRAM: LISCAN REVISION: 5.2 Start of execution: Mon 5 FEB 90 3:11p ** REEL HEADER **** LIS 90/01/25 ATLAS 01 'LIS CUSTOMER FORMAT TAPE' **'** TAPE HEADER LIS 9otoz/ 5 4164 01 'CN/MS, MAIN & REPEAT AT 4050-969 FT' PART NUMBER: W5790-MICRO MICROFILMED FILE # MAIN .001 **** FILE HEADER 1024 CN WN FN COUN STAT : AMOCO PROD. CO. : GP 17587 NO 6 : GRANITE POINT : KENAI : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 2 SPD 68 3 TEN 68 4 TTEN 68 5 CLSN 68 6 CSSN 68 7 CN 68 8 CNC 68 1 API 1 F/MM 1 LB 1 LB 1 CTS 1 CTS 1 PCT 1 PCT BYTES 4 4 4 4 4 4 4 4 RECEIVED FEB - 8 Alaska Oil & Gas Cons, Commissio~ Anchorage 11 SSN 12 CCL 68 1 68 CTS VOLT DATA RECORD DEPTH CLSN LSN 4050.000 -999.2500 -999.2500 o0o.ooo 1.785825 14.28660 3950,000 1.820826 14.56660 3900.000 2,451550 19.61240 3850.000 1.781651 14.25320 3800.000 1.810312 14.48250 3750.000 1.354250 10.83400 3700.000 ]..959113 15.67290 3650.000 1.717125 13.73700 6oo.ooo 2.465225 19.72180 3550.000 !.928963 15.43170 3500.000 2-564613 20.51691 3450.000 2.268313 18.14650 (TYPE# 0) GR CSSN SSN -999.2500 -999.2500 -999.2500 40.01990 85.29640 85.29640 30.59825. 92. 60271 92.60271 26.45770 98,91229 98.91229 994 BYTES * CN CCL -099,2500. -999,2500. -999,2500 O2 o2 86.88112 0,4599999E-01 38.80859 105.5183 0,4599999E-01 ~41.39030 56.55,354 0.4599999E-01 · . 25.15822 '40.9.9001 88.84041 99.05872 88. 84041 O. 4599999E-01 93.17441 0,4599999E-01 25,14899 45,19061' 9o.5 3 81.06052 0,4599999E-01 22.98651 42.00~69 92.57201 84.200.30 92. 57201 O. 4599999E-01 .. 16.81171 42.40201 91.21950 122.t433 91.21950 0.4599999E-01 27.95140 '43.55370 104.7793 63.69682 104.7793 0.4599999E-0! · 25.07788 42,62521 91.40190 84.88266 91.40190 0.4599999E-01 . 20.71526 46'81230 99.25981 51.81357 99.25981 0.4599999E-0t . ,' 22.48848 37.67320 95.06401 61.61566 95.06401 0.9200001E-0t , .. · TEN CNC . -999,2500 --999,2500 302,9629 88.01971 140,1020 110,9661 37.36250 ,54,2o517 8,931620 102.8262 -3,610284 116.3859 -20,46123 236.5359 -25.88474 84.85474 -29.44135 132.8266 -21.86880 61.77661 -46,91876 85,65709 -15.63216 ~49.3t479 -19.80212 59.54570 TTEN~. . , ' CCL 1. -999,2.500 -999.2500 1587.4-87 0. 4599999E-01 1599..989 0,4599999E-01 · 1559,342. , · . 0,4599999E-01 1552. 893 0. 4599999E'01 1537.i53 0.4599999E-0i 1522,334 0.4599999E-01 1517.261 0,4599999E-01 ·1488.943 0,4599999E-0t 1484,560· 0.4599999E-01 1430..489. 0.4599999E-01 1451.611 0.4599999E-01 0~429.785 920000IE-01 ,14880 3350.000 1,876213 15,00970 3300,00© 1,532351 12,25880 3250,000 2,122550 16.98041 3200.000 1.951450 15.61160 3150.00© 2,07977.5 16.63820 3100.000 .1,789625 14.31700 3050'.000 1,545012 12.36010 3000.O00 1,829863 14.63890 2950,000 1o953712 15.62970 2900.000 1.771263 14.17010 2850,000 1o 851.350 14.81080 280O.0O0 1,938601 15.50880 2750,000 1,732925 13.86340 2700.000 1.595475 12.76380 2650,000 1.551662 12.41330 2600.000 1,746338 86,20479 88.90840 88.90840 23.59836 88,28371 88,28371 ,.. 25.25395 91.01830 91,01830 21'79817 93.82600 93,82600 22.90276 92,35989 92,35989 22,76097 86.1883t 86,18831 25,67902 85,53610 85.53610 2.3,42490 90,64131 90,64131 26,47571 90.38481 90.38481 21,04425 90,20882 90.20882 24.58936 84,41380 84,41380 20.04408 85,99040 85.99040 88.19969 88.19969 22,08257 8.3, 50410 83,50410 26,44424 86.42401 86.42401 24.66628 85.04691 0,4599999E-01 . ,. 38,62,561 84,89931 0,4599999E-01 37,44409 164,1761 0,4599999E-01 -40.12457 .85,67670 -27,12822 193,9494 37,56020 -4.424026 65,07413 .63,26433 0,4599999E-01 88,59781 90.06439 36,43831 71,04687 o. 999 -oz 38.59581 89,03644 94',20798 43.40190 141,4643 0,4599999E-01 36,~11250 97,01889 0. 9200001E'-01 79.29900 0.45999gg~-0~ .856eo 106.0022 0.459999g~-01 ?6.19440 0.4599999~-01 33.96681 70,83336 0.9200001E-01 105.7810 0.4599999E-01 35,60201 116.0680 0.920'0001E-01 , 37,85031' 144,6254 0.4599999E-01 38.80270 92. 07542 -9,154575 69.82011 -38,17899 90,58905 -30,74126 159.8809 -41,19208 100,2969 ., -40,46434 79.o15643 -43,62996 111,5838 -28.,96585 75,60600 -23,14613 69,58284 =22.06155 t11,3013 -37.,46193 124.6859 -31,43085 164,4760 -23,47432 94,24927 1383.064 0,4599999E-01 1374 978 1374,674, 0,4599999E-01 1334,874 0,4599999E-01 · 1338,9t8 0°4599999E-01 1297,194 94,20798 1295,765 0.,4599999E-01 1266,168 0,9200001E-01 1241,432. 0,4599999E-01 1220,468 0.4599999E-01 1212,778 0,4599999E-01 1201.461 0.9200001E-01 1196.046 0,4599999E-01 1171,621 O, 9200001E-01 1153,698 0.4599999E-01 1143,906 0,9200001E-01 2550.000 1.683825 13.47060 2500.000 1.968813 15.75050 2450.000 1.501238 12.00990 2400.000 1.607326 12.85860 2350,000· 1.317275 10.53820 2300,~000 1.611012 12.88810 2250.000 1.682900 13.46320 2200.000 1.803926 14.43140 2150. 000. 1.665788 13.32630 2100.000 1.344937 10.75950 2050.000~ 1.405126 11,.24100 20OO.O00 1.532225 12.25780 1950.000 1.322825 10.58260 1900,000 1.361712 10.89370 185o, 000 1.407075 11.25660 1800.000 1.423987 11.39190 21. 87. 87. 18. 84. 84. 20. 80. 80. 21. 82. 82. 23. 80, 80. 21. 86. 86. 19. 83. 83. 21. 88. 88. 22. 85. 85. 22. 80. 80. 23. 79. 79. 22. 87. 87. 21. 74. 74. 18. 73, 73. 24. 74. 74. 17. 74. 74. 63594 29590 29590 83379 01651 01651 24561 34990 34990 35347 92281 92281 61089 29300 29300 76047 87099 87099 72214 58141 58141 64317 53940 53940 20708 96211 96211 83226 71391 71391 97281 69452 69452 24866 36989 36989 94090 00600 O0600 81068 31470 31470 44165 47560 47560 49788 84392 84392 39.96031 112.4180 64.31310 94.20798 . .. 125.3649 o. 9200001 -01 40'66699 110.5984 0.920000!E-01 41'35460 200.0000 0.4599999E-01 '39.',61961 128.6943 0.4599999E-01 97.82118 0,4599999E-01 38,47380 94.29655 0.4599999E-O1 110,6976 5.887999 38.48561 192.5122 0.4599999E-01 39,03770 154..7094 0.4599999E-01 39.10910 157.8614 0.4599999E-01 . 41.32480 147.01i0 o.9 oooo -o ' 127.9957 0.4599999E-01 120..6100 0.4599999E-01 !i7,7,453 0.4599999E-01 -.. . : .-. -35.10672 119.8794 -29.03479 62.44118 -t6,03476 137.214'5 -51.58708 117..5068 -36.45268 252..6642 -30,55336 141.8010 -17. 68542 10i.2894 -13.62953 96.95216 -23,73480 117.6356 -48.89880 ~239.8881 -31.82368 179.4512 -37.00656 184.2312 -39.08727 · 167.9751 -31..85664 140.8343 -33.98494 !30.7556 -40.14655 126.9159 1116.778 0.4599999E-01 1093.548 94L20798 1092. 729.. 0.9200001E-01 1039.346. 0.4599999E-01 1027,207 0.4599999E-01 1026.997 0.4599999E-~01 1026.350 0.4599999E'01 990.5654 5. 887999 .954.1499 O. 4599999E-01 957.6428 0. 4599999E-01 932.1409 0. 4599999E'0i 910.3286 0.9200001E-01 , 913.9204 0. 4599999E-01 890. 1147 0. 4599999E'01 869.2158 0. 4599999E-~01 8,857801 1700. 000 1.268275 10.14620 1650 .'000 !. 131588 9.052700 1600..000 1.457263 11.65810 1550.000 1.434362 11.47490 1500.000 1. 469900 11.75920 1450,000. 1.177612 9,420900 1400.000 1.37.6000 1.1.00800 1350.000 1. 168238 9.345900 1300.000 1.771288 i4.17030 1250.000 1.141550 9.132401 120o ooo 1.315550 '10.52440 5o,ooo ~1.542063 12.33650 1100.000 1..543651 12.34920 1050.000 1.250100 10.00080 1000. 000 1.478713 11.82970 18 74 74 18 74 74 19 75 75 25 72 72 21 74 74 2O 23 18 73 73 19 71 71 18 73 73 22 76 76 19 8O 80 20 82 82 21 77 77 22 78 78 .45590 .45590 .6o?5o .97971 .97971 .96068 .00400 .00400 .12917 .64342 .64342 .06566 ,31340 .31340 .69531 .31099 .31099 .44231 .08290 .08290 .21497 .36852 .36852 .57759 .40611 .40611 .50760 .56419 .56419 .22063 .05872 .05872 .45668 .58281 .58281 .73004 .24210 .24210 .26733 .91710 .91710 .35123 .53711 .53711 0.9200001E-01 43.84381 176.5257 0.4599999E-01 . . 200..0000 0~4599999E-01 45'48491 109.7375 0.4599999E-01 104.0965 0.9200001E-01 47,47881 103.5121 0.4599999E-01 48.03680 200.0000 0.4599999E-01 8. o73o' t27.9893 0.4599999E-01 33.92520 200.0000 0.9200001E-01 34.80901 56.45053 0.4599999E-01 37.32520 200.0000 0.4599999E-01 '37. 15991 166.3890 0. 4599999E-01 38.868i9 115.4565 O. 4599999E-01 39.14790 123.3781 0.4599999E-01 39.96620.. 200.0000 0.4599999E-01 39.7728'! 122.O513 .9200001E-01 -32.66884 213.5020 -36.73022 252.6642 -3i,.78313 116.3898 -34.67606 109.1575 -27.63635 108. 4168 -35.84207 252.6642 -14.80836 140.8254 -32.2964'5 252.6642 -17.99255 ~ 54. 09775 -20.11047 252.6642 -28.54373 197.3996 -30.42221 123.8763 -25,86278 134.5026 -33.77844 252 ..6642 -29.87842 13217020 845.1.465. .. 0.4599999E-01 82t.3796. 0. 4599999E-0i . . 813.0840 0.4599999E-01 .796.6672 0. 9200001E-01 782.3154 0.4599999E-01 763.6506 0. 4599999E-0i 759.3916 0.4599999E-01 732'9492 0.9200001E-01 726.9480 0.4599999E-01 717. 8689 0.4599999E-01 696.3662 0.4599999E'01 670.1277 0. 4599999E-0! 658.9768. 0. 4599999E-0t 636.3154 0.4599999E-01 6t6.2488 0. 9200001E-01 ~*** FILE TRAILER *~** FILE # 2 REPE~T. 0 0 2 FILE HEADER 1024 FORMAT RECORD (TYPE# 64) ONE DEPTH PER Fi~AME TAPE DEPTH UNIT : FT 12 CURVES : NAME 1 GR 68 2 SPD 68 3 TEN 68 4 TTEN 68 5 ~CLSN 68 6 CSSN 68 7 CN 68 8 CNC 68 9 CCL 68 ~10 LSN 68 11 ssN 68 12 CCL 68 CODE SAMPLE# UNIT API F/MM LB LB CTS. CTS PCT PCT VOLT CTS VOLT BYTES 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH CLSN LSN 4050.000 0.0000000E+O0 0.0000000E+00 4000. 000 1.723312 13.78650 3950.000 1.775775 14.20620 3900.000 .2.529263 20.23410 3850.0OO 1.879113 15.03290 (TYPE# 0) GR CSSN SSN 0?0000000E+00 50.00000 0.0000000E+00 38.64549 82.95461 82.95461 36.18805 89.62801 89.62801 30.73122 105.2539 105.,2539 24.15350 85.59290 85.59290 994 BYTES SPD CN CCL 0,0000000E+00 0.0000000E+00 35.00000 26.99110 88.90837 0. 9200001E-01 42.37221 102.9586 0.4599999E-01 TEN CNC -500.0000 0.0000000E+00 TTEN CCL 158.7424 90.87685 20O0.O0O 35.00000 38.25247 107.5817 1600.225 0. 9200001E-01 41.58960 5.347568 60.61450 59.57414 41.58960 2.839855 75.98549 76.19229 0.9200001E-01 1569.339 0.4599999E-01 1547.215 0. 9200001E-01 1537.378 0. 9200001E-01 2000. 000 0.0000 0 OE+O0 0.4599999E-0i . · TOTAL DATA RECORDS : 27 ST32RTING T/~E DEPTH = 4050.00 ENDIN~TAPE DEPTH = FILE TRAILER **** **** TAPE TRAILER LIS 90/01/25 4164 01 TOTAL RECORDS IN THIS. LOGICAL TAPE : ·362 3794,00 **** REEL TRAILER **~* LIS 90/01/25 ATLAS 01 TOTAL RECORDS IN THIS LOGICAL REEL TOTAL RECORDS IN THIS PHYSICAL REEL: End Of execution: Mon 5 FEB 90~ 3:12p Elapsed execution time = 42,84 seconds. 363 363 SYSTEM RETURN CODE = 0