Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-195 . •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 r f l
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue 0 a- 1
Anchorage, Alaska 99501
5
Subject: Corrosion Inhibitor Treatments of MPS -Pad �
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely, •
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPS -Pad
10/1112011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS -02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 729/2011
MPS-11 2021130 50029230920000 1 NA 1 NA 102 7/29/2011
MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS-13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7292011
MPS -15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/312011
MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 729/2011
MPS-17 2021730 50029231150000 Open Flutes - Treated
MPS -18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7292011
MPS -21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/32009
MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7282011
MPS -23 2021320 50029230980000 Open Flutes - Treated
MPS -24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS-25 2021030 50029230890000 Open Flutes - Treated
MPS-26 2030610 50029231500000 1 NA 1 NA 8.5 7282011
MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 72812011
- ' - "j MPS -29 2021950 50029231190000 Open Flutes - Treated
MPS -30 2022360 50029231310000 12 NA 1.2 NA 11.9 7/28/2011
MPS-31 2020140 50029230660000 Open Flutes - Treated
MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7282011
MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7282011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7282011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS-37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/182011
MPS-41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/112011
MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 916/2011
MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011
.
.
'"
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _ Marker.doc
I I
,10
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
àv
Permit to Drill 2021950
Well Name/No. MILNE PT UNIT SB S-29
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23119-00-00
MD 12950-
TVD 4313/
Completion Date 10/16/2002 ",'
Completion Status 1-01L
REQUIRED INFORMATION
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, GYRO, ABIIIFRlCASANDRA
Well Log Information:
Logl Electr
Data Digital Dataset
Type Med/Frmt Number Name
~_.-Rpt MIS Verification
ED 0--'''-
ED D
Rpt
Rpt
ED \e'''/
ED C Asc
ED C Pdf
ED C Pdf
12950 Open 11/1/2002 MWD
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 9/30/2002.
0 12950 Open 11/1/2002
0 12950 Open 11/1/2002
1,2,3,4 64 12950 Open 6/2/2003
1,2,3,4 108 12950 Open 6/2/2003 MWD - ROP, DGR, EWR -
MD ----;
1,2,3,4 108 4313 Open 6/2/2003 MWD - DGR, EWR -TVD
Sample
Set
Number Comments
Log Log
Scale Media
Run
No
1
1
1
1
/ Directional Survey
t)Í 1388 LIS Verification
A~Ctionalàurvey'
-c5í~~ctional Survey
Directional Survey
(,~ 962 LIS Verification
ßA'962 Induction/Resistivity
25
,Þ~962 Induction/Resistivity
25
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
Current Status 1-01L
€~'_.)
-.'--.... . ",.......~-r;¡:.;:>..-~"
Directional Survey Yes ,-,
(data taken from Logs Portion of Master Well Data Maint)
'~
Interval
Start Stop
71 12896
0 12950
71 12896
0
OH/
CH Received Comments
Case 12/13/2002
Open 11/1/2002 MWD
Case 12/13/2002
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
Permit to Drill 2021950
Well Name/No. MILNE PT UNIT SB S-29
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23119-00-00
MD 12950
TVD 4313
Completion Date 10/16/2002
Completion Status 1-01L
Current Status 1-01L
UIC N
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? .. Y tN"
Daily History Reœived?
ð/N
~/N
Formation Tops
Analysis
Received?
- Y/N -
Comments:
'~
Compliance Reviewed By:
)L
Date:
Äß/ J~PHt 1
'" ~
---
)
}
&08 -/95
# J I9'ÚJ~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January 16, 2003
RE: MWD Formation Evaluation Logs: MPS-29,
AK-MW-22160
MPS-29:
Digital Log Images:
50..029-23119-00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
ReCe\VEÐ
DaWN O? ?OO?h
A181k1 OR & Gas Coni. ~1\
And\~e
éJ-()d -l 4 S
Signed~~,~~ ~\.~
--,
"",,~~~:. C:\
F,~~\~\~
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 01/05/03, Start Production
1. Status of Well
IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4136' NSL, 3807' WEL, SEC. 01, T12N, R10E, UM (OB)
At total depth
1826' NSL, 1513' WEL, SEC. 35, T13N, R10E, UM (OB)
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE= 66.6' ADL 025518
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
9-30-2002 10-9-2002 10-16-2002
17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey
12950 4313 FT 12950 4313 FT 0 Yes IBI No
22. Type Electric or Other Logs Run
MWD , GR RES, GYRO, ABI I IFR I CASANDRA
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
28' 112' 4211
28' 9237' 9-7/811
23.
CASING
SIZE
2011
7-5/811
WT. PER FT.
92#
29.7#
GRADE
H-40
L-80
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1868 sx PF 'L', 600 sx Class 'G'
(Top Job 49 sx PF 'L' )
6-1/811 Uncemented Slotted Liner
4-1/211
12.7#
L-80
9103'
12950'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
MD
TVD
TVD
MD
9207' - 12948' 4187' - 4313'
27.
Date First Production
December 11, 2002
Date of Test Hours Tested
12/18/2002 6
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL -BBL
TEST PERIOD 1321
GAs-McF
931
GAs-McF
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
Classification of Service Well
7. Permit Number
202-195
8. API Number
50- 029-23119-00
:;;",",i.OO,',~,¡~, .''',7, " ,""'" 9. Unit or Lease Name
~~J Milne Point Un"
',~ 10. Well Number
MPS-29
11. Field and Pool
Milne Point Unit I Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
AMOUNT PULLED
25.
TUBING RECORD
DEPTH SET (MD)
8174'
PACKER SET (MD)
8123'
SIZE
4-1/211, 12.6#, L-80
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 82 Bbls of Diesel
WATER-BBL
0
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
705
OIL GRAVITY-API (CORR)
28.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water.
No core samples were taken.
Form 10-407 Rev. 07-01-80
RBDMS BFt
(~P--
sUbnR'(;rfê~
JAN 0 é i
9
Submit In Duplicate
)
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
SBF1-NB 7863' 4013'
SBF1-NBR 7877' 4018'
SBF12 79211 4034'
SBE4-NC 7944' 40431
SBE41 7961' 4049'
SBE2-NE 7978' 4055'
SBE1-NF 81151 41051
Top of Schradder OA Sand 8202' 4131'
TSBC 85331 4159'
Top of Schradder 08 Sand 8949' 4178'
Top of Schradder OB Sand 128861 4315'
31. List of Attachments:
Post Rig Work Summary Report.
)
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered
and gravity, GaR, and time of each phase.
RECEI
JAN 0 6
32. I hereby certify that the f going is true and correct to the best of my knowledge
Signed :.~ Tit!e Technical Assistant Date C) t - O~'-06
MPS-29 202-195 Prepared By Name/Number: Sandra Stewman, 564-4750
Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
I"!"EM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Well:
Field:
API:
Permit:
')
)
MPS-29 & MPS-29L 1
Milne Point Unit / Schrader Bluff Field
50-029-23119-00 & 50-029-23119-60
202-195 & 202-196
Rig Accept: 09/29/02
Rig Spud: 09/30/02
Rig Release: 10/16/02
Drilling Rig: Doyon 141
POST RIG WORK
11/13/02
RIH VERY SLOW, PULLED BALL & ROD @ 8145'WLM. PLAN TO ASSEMBLE EXTRA LUBRICATOR
SECTION & EXTRA WEIGHT BAR TO RETRIEVE RHC IN AM.
11/14/02
USED PUMP TRUCK TO ASSIST IN WIRELlNE OPERATIONS, AS SHOWN ABOVE. PULLED RHC
@ 8169'. PULLED RP SHEAR VALVE @ 2214', AND REPLACED W/ DGLV. SHIFTED SSD INTO
OPEN POSITION, AND SET JET PUMP W/ 13B RATIO, #13 NOZZLE, AND #14 THROAT (SER#BP-
1071). FREEZE PROTECTED IA W/52 BBLS DIESEL.
)
~Od'- /95
/ I 3~t
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
December 12, 2002
RE: MWD Formation Evaluation Logs MPS-29,
AK-MW-22160
1 LIS formatted Disc with verification listing.
API#: 50-029-23119-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~(~~
RECEIVED
DEe 1 3 2002
Ala~'/2 "'1:' &'
øt!.;g Vii {'J;",I' C'" .
"'Q~ l\tI',,;. I "
Vr ro;¡, wmmiss'
AnChoraae iOn
"",'"
:'j
'\
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
Ia Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc. ~I"lær~j,
3. Address ~'.'J'
P.O. Box 196612, Anchorage, Alaska 99519-6612 ,"~
4. Location of well at surface r';';';,:';;';:"~;~:;7,~'"\\' :m. ~L,1<oJ
3270' NSL 340' WEL SEC. 12 T12N R10E UM ;: "'.",,d ì'.d ii ;;"''''''!<?'''''~''"'''''''''''''''Íi!f/
At top of productive i~terval' " .~ CJ\ TE l
4136' NSL, 3807' WEL, SEC. 01, T12N, R10E, UM (OB) i .1t2.~~P-4-
1 ~~~~~k~~~~13' WEL, SEC. 35, T13N, R10E, UM (OB) t:::~~:~:=J
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE= 66.6' ADL 025518
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
9-30-2002 10-9-2002 10-16-2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12950 4313 FT 12950 4313 FT IBI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR RES, GYRO, ABI/IFR 1 CASANDRA
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD
2011 92# H-40 28' 112' 4211 ~60 sx Arctic Set (Approx.)
7-5/811 29.7# L-80 281 9237' 9-7/811 1868 sx PF IL', 600 sx Class IGI
(Top Job 49 sx PF 'Ll)
12950' 6-1/811 Uncemented Slotted Liner
Classification of Service Well
7. Permit Number
202-195
8. API Number
50-029-23119-00
9. Unit or Lease Name
Milne Point Unit
10. Well Number
MPS-29
11. Field and Pool
Milne Point Unit I Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
4-1/211
12.7#
L-80
9103'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
25.
SIZE
4-1/211, 12.6#, L-80
MD
TVD
TVD
MD
AMOUNT PULLED
TUBING RECORD
DEPTH SET (MD)
8174'
PACKER SET (MD)
8123'
9207' - 12948' 4187' - 4313'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 82 Bbls of Diesel
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. S~€~~i¥ t D
26.
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
OIL-BBL
GAs-McF
WATER-BBL
No core samples were taken.
NO\! I Q
. ()
QBDMS BFL
Form 10-407 Rev. 07-01-80
CHOKE SIZE
GAS-OIL RATIO
OIL GRAVITY-API (CORR)
NOV 1 4 2002
Alaska Oil & Gas Cons. Commission
Anchorage
Submit In Duplicate
')
')
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
SBF1-NB
7863'
4013'
SBF1-NBR
7877'
4018'
SBF12
7921'
4034'
SBE4-NC
7944'
4043'
SBE41
7961'
4049'
SBE2-NE
7978'
4055'
SBE1-NF
8115'
4105'
Top of Schradder OA Sand
8202'
4131'
TSBC
8533'
4159'
Top of Schradder 08 Sand
8949'
4178'
RECEIVED
Top of Schradder OB Sand
12886'
4315'
NOV 1 4 2002
31. List of Attachments:
Alaska Oil & Gas Cons. Commission
Anchor~go
Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary.
32. I hereby certify that the
Signed
Date
\ t - l~--O~
MPS-29
Well Number
Permit No. / Approval No.
Prepared By Name/Number: Sandra Stewman, 564-4750
Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: MPS-29
Common Name: MPS-29
Test Date
1 0/8/2002
Test Type
FIT
Test Depth (TMD)
9,278.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
4,192.0 (ft)
AMW
8.90 (ppg)
Surface Pressure
540 (psi)
Leak Off Pressure (BHP)
2,478 (psi)
Page 1 of 1
EMW
11.38 (ppg)
"'-,/
"'"-"
Printed: 10/21/2002 8:49:21 AM
)
t ')
BP EXPLORATION
Operations Summary Report
Page 1 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
M PS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 1 0/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
9/29/2002 14:00 - 19:30 5.50 MOB P PRE MOVE RIG FROM MPS-17, SPOT RIG OVER MPS-29
19:30 - 20:30 1.00 MOB P PRE SPOT ROCKWASHER, HOOK UP SERVICE LINES
20:30 - 00:00 3.50 MOB P PRE REPAIRING TOP DRIVE
9/30/2002 00:00 - 04:00 4.00 RIGU P PRE NIPPLE UP DIVERTER, TAKING ON WATER, MIXING SPUD
MUD, LOAD PIPE SHED
RIG ACCEPT @ 00:01 9/30/2002
04:00 - 05:00 1.00 RIGU P PRE CHANGE OUT TOP DRIVE SAVER SUB.
05:00 - 14:00 9.00 DRILL P INT1 PICKING UP DRILL PIPE AND STANDING IN DERRICK,
TOTAL OF 297 JTS. OF 41N, 17 JTS 5 HWP, 3 FLRX
COLLARS
14:00 - 15:00 1.00 DRILL P INT1 SLIP AND CUT DRILLING LINE
15:00 - 15:30 0.50 DRILL P INT1 SPUD MEETING
15:30 - 17:00 1.50 DRILL P INT1 PICKUP BHA BIT ,7" MOTOR 1.5 BEND, STAB,MWD,HANG
OFF SUB,UBHO SUB,STAB, I STAND HWP
17:00 - 17:30 0.50 DRILL P INT1 FUNCTION TEST DIVERTER AND ACCUMULATOR
WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK
SCHEVE AOGCC
17:30 - 19:30 2.00 DRILL P INT1 SPUD WELL, DRILLING FROM 108 TO 270'
GOT GOOD MWD SURVEY @ 168 FT SURVEY DEPTH
19:30 - 20:30 1.00 DRILL P INT1 RIG UP SLICK LINE RUN GYRO @ 178' SURVEY DEPTH
20:30 - 00:00 3.50 DRILL P INT1 DRILLING FROM 270' TO 813' WITH 70 RPM, 20/25K BIT
WT. 360 GALS MIN. 900 PSI, TO 3,000 ART 2, AST 1.5
KICKED OFF @ 270 FT.
10/1/2002 00:00 - 16:30 16.50 DRILL P INT1 DRILLING FROM 813' TO 3213' - WOB 15K TO 20K - GPM
505 - PP ON 2520 - PP OFF 2400 - RPM 80 - TO ON 5K - TO
OFF 3K - PU 78K - SO 62K - ROT 73K
16:30 - 17:30 1.00 DRILL P INT1 CIRC CONDITION HOLE FOR TRIP - 80 RPM'S - 500 GPM -
PP 2400
17:30 - 20:00 2.50 DRILL P INT1 PUMP OUT OF HOLE @ 500 GPM TO 719'
20:00 - 22:00 2.00 DRILL P INT1 BHA - STAND BACK HWDP - FLEX DC'S - UD UBHO SUB -
BREAK OFF BIT - ADJUST MOTOR TO 1.22 DEGREE - M/U
BIT # 2 - ORIENT - RIH WITH FLEC DC'S
22:00 - 22:30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
22:30 - 23:00 0.50 DRILL P INT1 BHA - RIH WITH HWDP - JARS - PULSE TEST MWD
23:00 - 00:00 1.00 DRILL P INT1 CON'T RIH WITH DP TO 3213'
10/2/2002 00:00 - 01 :30 1.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3213' TO 3518' - WOB 20K-
GPM 500 - PP ON 2550 - PP OFF 2450 - RPM 120 - TO ON
5K TO OFF 4K
01 :30 - 02:00 0.50 DRILL N SFAL INT1 MUD PUMP # 1 - CHECK SUCTION VALVES - TIGHTEN
LINES
02:00 - 06:30 4.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3518' TO 4546' - WOB 25K TO
30K - GPM 500 - PP ON 3050 - PP OFF 2900 - RPM 120 - TO
ON 7K - TO OFF 5K - PU 93K - SO 62K - ROT 77K
06:30 - 08:00 1.50 DRILL P INT1 CIRC FOR SHORT TRIP - 3 X BU - OBSERVE WELL
08:00 - 11 :00 3.00 DRILL P INT1 PULL OUT HOLE TO 3610' - SWABBING TIGHT - PUMP OUT
FROM 3610' TO 720' - GPM 500
11 :00 - 11 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
11 :30 - 13:00 1.50 DRILL P INT1 RIH TO 4455' - WASH / REAM FROM 4455' TO 4546'
13:00 - 20:30 7.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4546' TO 5834' - WOB 25K TO
30K - GPM 500 - PP ON 3450 - PP OFF 3300 - RPM 120 - TO
ON 10K - TO OFF 7K - PU 112K - SO 50K - ROT 82K
20:30 - 21 :30 1.00 DRILL N RREP INT1 SWIVEL PACKING - PULL STAND OUT OF HOLE - TIGHT -
INSTALL CIRC HEAD PIN - CIRC HOLE WITH 30 STKS 107
Printed: 10/21/2002 8:51 :00 AM
') )
cJ:~
BP EXPLORATION Page 2 of?
Operations Summary Report
Legal Well Name: MPS-29
Common Well Name: M PS-29 Spud Date: 9/30/2002
Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 10/16/2002
Contractor Name: DOYON Rig Release: 10/16/2002
Rig Name: DOYON 141 Rig Number: 141
Date From - To Hours Task Code NPT Phase Description of Operations
1 0/2/2002 20:30 - 21 :30 1.00 DRILL N RREP INT1 GPM @ 500 PSI - CHANGE OUT SWIVEL PACKING - WASH
BACK TO BTM
21 :30 - 00:00 2.50 DRILL P INT1 DIRECTIONAL DRILL FROM 5834' TO 6134' - WOB 25K TO
30K - GPM 500 - PP ON 3500 - PP OFF 3400 - RPM 120 - TQ
ON 10K - TQ OFF 7K - PU 115K - SO 50K - ROT 78K
10/3/2002 00:00 - 08:30 8.50 DRILL P INT1 DIRECTIONAL DRILL FROM 6134' TO 7508' - WOB 25K TO
30K - RPM 120 - TQ ON 12K - TQ OFF 8K - GPM 500 - PP
ON 3770 - PP OFF 3600 - PU 135K SO 50K - ROT 85K
08:30 - 11 :00 2.50 DRILL P INT1 CIRCULATE HOLE CLEAN 3 X BU - GPM 500 - RPM 120 -
OBSERVE WELL - WELL STATIC
11 :00 - 17:30 6.50 DRILL P INT1 PUMP OUT OF HOLE TO 2200' - GPM 500 - CON'T PULL
OUT HOLE TO BHA
17:30 - 21 :00 3.50 DRILL P INT1 STAND BACK 4 STANDS OF 5" HWDP - JARS - UD 6 JTS
OF 5" HWDP - STAND BACK FLEX DC'S - BREAK BIT - M/U
NEW BIT - (PRECAUCTIONARY BIT CHANGE FOR T.D.
WELL) - DOWN LOAD MWD - UP LOAD MWD - RIH WITH
FLEX DC'S - 5" HWDP - JARS - PULSE TEST MWD
21 :00 - 21 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE - BLOCKS
21 :30 - 00:00 2.50 DRILL P INT1 RIH WITH 5" DP TO 5830' - FILL PIPE 25 STDS AND 23
STANDS - (5000' TO 5830') STRING TAKING WEIGHT
WORKING IN HOLE - FRICTION WT
10/4/2002 00:00 - 01 :30 1.50 DRILL P INT1 PUMPING / REAMING IN HOLE FROM 5830' TO 6813' - RIH
FROM 6813' TO 6954' - PUMP IN HOLE FROM 6954' TO
7175' - RIH FROM 7175' TO 7361' - PUMP / REAM FROM
7361' TO 7508'
01 :30 - 18:30 17.00 DRILL P INT1 DIRECTIONAL DRILL FROM 7508' TO 9248' - T.D. 97/8"
HOLE - WOB 15K TO 20K - RPM 120 - TQ ON 12K - TQ OFF
10K - GPM 480 - PP ON 4130 - PP OFF 4000 - PU 137K - SO
48K - ROT 86
18:30 - 00:00 5.50 DRILL P INT1 CIRCULATE HOLE CLEAN - 4 X BU - 35000 STKS - RPM 120
- GPM 480 - STAND ONE STAND BACK EVERY 4000
STROKES PUMPED - OBSERVE WELL - WELL STATIC
10/5/2002 00:00 - 01 :00 1.00 DRILL P INT1 PUMP OUT FROM 8425' TO 7500' - GPM 480 - NO
PROBLEMS HOLE IN GOOD SHAPE
01 :00 - 05:00 4.00 DRILL P INT1 POOH FROM 8425' TO BHA @ 541'
05:00 - 06:30 1.50 DRILL P INT1 PULL BHA - DOWN LOAD MWD - UD MWD - BREAK BIT -
UD MOTOR
06:30 - 07:30 1.00 DRILL P INT1 CUT DRLG LINE
07:30 - 08:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
08:00 - 09:00 1.00 DRILL P INT1 MAKE UP HOLE OPENER - RIH TO 1500'
09:00 - 13:00 4.00 DRILL P INT1 CONTROL REAM FROM 1500' TO 3466' @ 6 STANDS PER
HOUR (INCLUDING CONNECTION TIME) - WOB 0 - RPM
150 - TQ 8K - 550 GPM - PP 1250
13:00 - 14:30 1.50 DRILL P INT1 RIH TO 7951'
14:30 -17:30 3.00 DRILL P INT1 CONTROL REAM FROM 7951' TO 9248' @ 6 STANDS PER
HOUR (INCLUDING CONNECTION TIME) - WOB 0 TO 5K -
RPM 150 - TQ 10K - PP 3000 - PU 135K - SO 51 K - ROT 88K
17:30 - 21 :30 4.00 CASE P INT1 CIRCULATE CONDITION HOLE AND MUD - GPM 550 - PP
3200 - RPM 150 - TQ 10K - SPOT LUB PILL @ BIT-
OBSERVE WELL - WELL STATIC - PUMP DRY JOB
21 :30 - 00:00 2.50 CASE P INT1 POOH FROM 9248' TO 3000' - HOLE IN GOOD CONDITION
10/6/2002 00:00 - 01 :00 1.00 CASE P INT1 POH FROM 3000' TO BHA @ 477'
01 :00 - 02:30 1.50 CASE P INT1 BHA - LAY DOWN 5" HWDP - JARS - FLEX DC'S -
Printed: 10/21/2002 8:51 :00 AM
')
)
BP EXPLORATION
Operations Summary Report
Page 3 of?
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/6/2002 01 :00 - 02:30 1.50 CASE P INT1 STABILIZERS - HOLE OPENER
02:30 - 03:30 1.00 CASE P INn CHANGE SAVOR SUB TO 4 1/2 IF
03:30 - 05:00 1.50 CASE P INT1 RIG UP CASING TOOLS TO RUN 7 5/8" CASING - PJSM
05:00 - 13:30 8.50 CASE P INT1 PICK UP AND RUN 225 JTS OF HYDRIL 521 7 5/8" 29 #
CASING + XO JOINTS - (TOTAL 9209' RAN) - LANDED WITH
50K ON WEIGHT INDICATOR - BLOCK WEIGHT 35K -15K
CASING WEIGHT LEFT - SHOE 9237' - FLOAT COLLAR
9150' - NO CIRCULATION REQUIRED - NO BRIDGES-
HOLE IN EXCELLENT SHAPE
13:30 - 18:00 4.50 CASE P INT1 CIRCULATE AND CONDITION MUD / HOLE FOR CEMENT
JOB - 8 BPM - 500 PSI
18:00 - 23:00 5.00 CASE P INT1 PUMP 10 BBLS WATER - TEST LINES TO 3500 PSI- PUMP
40 BBLS WATER @ 7 BPM - 500 PSI- PUMP 47 BBLS
SPACER 10.2 PPG - DROP BOTTOM PLUG - PUMP 3 BBLS
SPACER - @ 6.5 BPM - 450 PSI - PUMP TOTAL 1351 BBLS
LEAD CEMENT @ 5.5 BPM - 1150 BBLS BACK STARTED
GETTING RED DYE - 1300 BBLS LOST RETURNS -
PUMPED ADDITIONAL 51 BBLS LEAD CEMENT NO
RETURNS - SWITCHED TO TAIL CEMENT - PUMPED 123
BBLS OF 15.8 TAIL @ 4 BPM - DROP TOP PLUG-
DISPLACE WITH 30 BBLS WATER HOWCO - TURN OVER
TO RIG - NO RETURNS
23:00 - 00:00 1.00 CASE P INT1 DISPLACE CEMENT @ 5.5 BPM WITH RIG PUMP
10/7/2002 00:00 - 00:30 0.50 CASE P INT1 CON'T DISPLACE CEMENT @ 5.5 BPM - BUMPED PLUG
WITH 4668 STKS - 392 BBLS - WITH 2400 PSI - HELD FOR 3
MINS - BLEED OFF PRESSURE - FLOATS HELD - PUMP
EFF 94% - NO CEMENT TO SURFACE
00:30 - 01 :30 1.00 CASE P INT1 DRAIN / FLUSH DIVERTOR RISER - LAY DOWN LANDING
JOINT - RIG DOWN CASING TOOLS
01 :30 - 03:00 1.50 CASE P INT1 NIPPLE DOWN DIVERTOR
03:00 - 04:00 1.00 CASE P INT1 CHANGE OUT TOP DRIVE SAVOR SUB TO 4"
04:00 - 05:30 1.50 CASE P INT1 RIG UP FOR TOP JOB - RUN 1" IN TO 115' - SOLID - WORK
1 " DOWN 3' - PULL 1" PLUGGED WITH GREEN CEMENT -
CLEAN 1" - RUN IN HOLE 110' - BREAK CIRC - PUMP 34
BBLS OF LEAD AT 10.7 PPG - 3 BBLS CEMENT BACK -
WASH UP / CLEAN CELLAR
05:30 - 06:30 1.00 CASE P INT1 ORIENT - NIPPLE UP WELL HEAD - (FMC GEN 6 5K) - TEST
FOR 10 MINS @ 1000 PSI
06:30 - 08:00 1.50 CASE P INT1 NU BOP'S
08:00 - 11 :30 3.50 CASE P INT1 PU 120 JOINTS 4" DRILL PIPE - CIRC DRILL PIPE CLEAN
11 :30 - 12:00 0.50 CASE P INT1 POOH WITH 4" DRILL PIPE
12:00 - 17:00 5.00 BOPSURP INT1 RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250
LOW 5 MINS - 2500 HIGH 5 MINS - PIPE RAMS - BLIND
RAMS - CHOKE MANIFOLD - HYD KILL - HYD CHOKE -
MANUAL KILL - MANUAL CHOKE - UPPER / LOWER IBOP -
FLOOR SAFETY VALVES - 250 LOW 5 MINS - 4000 HIGH 5
MINS ALL TEST WERE GOOD - ACCUMULATOR TEST -
3000/1900 - 38 SEC FOR 200 PSI - 3 MINS 45 SECS TO
3000 PSI- 5 BOTTLES 2100 PSI AVG
17:00 - 17:30 0.50 BOPSUR P INT1 RIG DOWN TESTING EQUIPMENT -INSTALL WEAR RING
17:30 - 19:00 1.50 CASE P INT1 PU BHA - SCRIBE - UP LOAD MWD - PULSE TEST MWD -
19:00 - 22:30 3.50 CASE P INT1 RIH TO 9141'
22:30 - 23:30 1.00 CASE P INT1 BREAK CIRC - TEST CASING TO 4000 PSI FOR 30 MINS
Printed: 10/21/2002 8:51 :00 AM
)
')
/
BP EXPLORATION
Operations Summary Report
Page 4 of?
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/7/2002 22:30 - 23:30 1.00 CASE P INn RECORDED ON CHART
23:30 - 00:00 0.50 CASE P INT1 TAG UP ON PLUG 9149' - DRILL PLUG FLOAT COLLAR
9150' - FIRM CEMENT TO 9235'
10/8/2002 00:00 - 00:30 0.50 CASE P INT1 DRILL SHOE @ 9236' - 30' NEW HOLE @ 9278'
00:30 - 01 :30 1.00 CASE P INT1 CIRC BTMS UP - BALANCE MUD WT TO 8.9 PPG - FOR FIT
01 :30 - 02:00 0.50 CASE P INT1 FIT - 540 PSI - 8.9 PPG - 4192 TVD = 11.38 PPG EMW
02:00 - 03:00 1.00 CASE P INT1 DISPLACE OLD 8.9 PPG SPUD MUD WITH NEW 9.1 PPG
FLOPRO
03:00 - 00:00 21.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 9278' TO 11350' - WOB 3K TO
13K - RPM 100 - TO ON 7K - TO OFF 6K - GPM 250 - PP ON
2350 - PP OFF 2000 - PU 1 OOK - SO 50K - ROT 82K
10/9/2002 00:00 - 15:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 11350' TO 12950' - T.D. OB
LATERAL - WOB 3K TO 13K - RPM 100 - TO ON 7K - TO
OFF 6K - GPM 250 - PP ON 2450 - PP OFF 2200 - PU 120 -
SO 52 - ROT 84
15:00 - 18:00 3.00 CASE P COMP CIRCULATE CLEAN UP HOLE - CBU 3 X - RPM-100 - GPM
250 - PP 2150 - PUMP LUB PILL
18:00 - 21 :30 3.50 CASE P COMP PUMP OUT FROM 12855' TO 9350' - GPM 250 - HOLE IN
GOOD SHAPE
21 :30 - 00:00 2.50 CASE P COMP POOH @ 1200'
10/10/2002 00:00 - 01 :00 1.00 CASE P COMP CON'T POOH - (BHA) STAND BACK FLEX DC'S - JARS-
HWDP - LAY DOWN MWD - BREAK BIT - LAY DOWN
MOTOR
01 :00 - 01 :30 0.50 CASE P COMP RIG UP CASING TOOLS - (PJSM ON PICKING UP LINER)
01 :30 - 04:00 2.50 CASE P COMP PICK UP 90 JOINTS 4.5" L-80 12.6# SLOTTED LINER - 2
JOINTS 4.5" L-80 12.6# BLANK LINER - BAKER 5.5" X 7 5/8"
HMC LINER HANGER - BAKER 5.5" X 7 5/8" ZXP LINER TOP
PACKER - BAKER 7" TIE BACK SLEEVE - BAKER RUNNING
TOOL
04:00 - 07:00 3.00 CASE P COMP CON'T RIH WITH LINER ON 4" DRILL PIPE to 12950'
07:00 - 10:00 3.00 CASE N DPRB COMP DROPPED 29/32" BALL AND CIRCULATED DOWN AT 4
BPM. NO PRESSURE INCREASE. WORKED PIPE AND
CONTINUED CIRCULATING AT VARIOUS RATE. NO
SUCCESS. DROPPED SECOND 29/32" BALL AND
DISPLACED DOWN AT 3 BPM. DID NOT BUMP.
10:00 - 10:30 0.50 CASE P COMP DROP 1 3/4" BALL - HANG LINER - SET PACKER -
RELEASE FROM LINER
10:30 - 14:00 3.50 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH
WITH LINER RUNNING TOOL - LAY DOWN RUNNING
TOOL
14:00 - 17:30 3.50 STWHIP P PROD2 PJSM - MAKE UP BAKER WHIPSTOCK ASSY - WITH MWD -
ORIENT MWD WITH WHIPSTOCK - PICK UP SINGLE DP -
12 DC'S - 17 HWDP - PULSE TEST MWD
17:30 - 21 :30 4.00 STWHIP P PROD2 TIH WITH WHIPSTOCK TO 8700' (RUNNING SPEED 2 MINS
PER STD)
21 :30 - 22:30 1.00 STWHIP P PROD2 CUT DRILLING LINE - RIG SERVICE
22:30 - 23:00 0.50 STWHIP P PROD2 RIH WITH WHIPSTOCK @ 8780' - ORIENT TO HIGH SIDE
23:00 - 23:30 0.50 STWHIP P PROD2 SET BTM ANCHOR - SHEAR OFF DISCONNET WITH 40K
DOWN WEIGHT
23:30 - 00:00 0.50 STWHIP P PROD2 MILLING WINDOW - TOP 8842' TO 8844' - WOM 4K - RPM
80 - TO ON 4K - TO OFF 3K - GPM 261 - PP 1300 - PU 108 -
SO 74
10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 MILLING WINDOW FROM 8844' TO 8869' (TOP OF WINDOW
Printed: 10/21/2002 8:51 :00 AM
')
')
BP EXPLORATION
Operations Summary Report
Page 5 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 8842' BOTTOM WINDOW 8854') - WOM 3K TO 5K - GPM 261
- PP 1350 - RPM 80 - TO ON 4K - TO OFF 3K
04:00 - 05:00 1.00STWHIP P PROD2 CIRCULATE HI VIS SWEEP - OBSERVE WELL - PUMP DRY
JOB - WORK MILLS THROUGH WINDOW - NO DRAG OR
OVERPULLS
05:00 - 08:00 3.00 STWHIP P PROD2 POOH WITH MILLING ASSY. MILL IN GOOD SHAPE AND IN
GAUGE
08:00 - 08:30 0.50 STWHIP P PROD2 FLUSH BOP STACK OF METAL CUTTINGS. FUNCTIONED
RAMS AND FLUSHED AGAIN
08:30 - 10:30 2.00 STWHIP P PROD2 CHANGED PULSER IN MWD. PICKED UP MOTOR SET AT
1.5 DEGREE AND OREINTED. MADE UP 6-1/8" SECURITY
RERUN FM2643 PDC BIT. UNLOADED MWD
10:30 - 13:30 3.00 STWHIP P PROD2 TRIPPED IN HOLE WITH DRILLING ASSEMBLY FILLING
DRILL PIPE EVERY 30 STANDS TO 8770'. BROKE
CIRCULATION AND ORIENTED MOTOR TO HIGH SIDE.
SHUT DOWN PUMP AND TRIPPED THROUGH WINDOW
WITH NO PROBLEMS. TAGGED BOTTOM AT 8869'
13:30 - 00:00 10.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 8869' TO 9575' - WOB 3K to 9K
- RPM 100 - TO ON 6K - TO OFF 5K - GPM 250 - PP ON 1600
- PP OFF 1550 - PU 110K - SO 73K - ROT 92K - (BASE OF
OA 9302 - START OF SAND)
10/12/2002 00:00 - 00:00 24.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 9575' TO 12250' - WOB 3K TO
15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON
2430 - PP OFF 2180 - PU 118K - SO 40K - ROT 83K
10/13/2002 00:00 - 07:00 7.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 12250' TO 12950' - WOB 3K TO
15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON
2450 - PP OFF 2100 - PU 117 - SO 40 - ROT 80
07:00 - 12:00 5.00 CASE P COMP CIRCULATE 4 X - RAISE LUBRICANTS TO 5% IN SYSTEM
12:00 - 16:00 4.00 CASE P COMP PUMP OUT FROM 12950' TO 8870' - PULL TROUGH LINER
FROM 8870' TO 8800' WITH OUT PUMP - NO PROBLEMS
16:00 - 19:00 3.00 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH
TO BHA
19:00 - 20:30 1.50 CASE P COMP STAND FLEX DC'S BACK - DOWN LOAD MWD - FLUSH
MOTOR - RE-CONF MOTOR - BREAK OFF BIT - LAY DOWN
MOTOR
20:30 - 21 :30 1.00 CASE P COMP PICK UP BAKER WHIPSTOCK RETRIEVING ASSEMBLY -
RIH WITH DC'S / HWDP - PULSE TEST MWD
21 :30 - 00:00 2.50 CASE P COMP RIH WITH WHIPSTOCK RETRIEVING TOOL TO 8170' -
FILL PIPE EVERY 30 STANDS
10/14/2002 00:00 - 00:30 0.50 CASE P COMP CON'T RIH TO 8774'- WITH RETREIVING TOOLS
00:30 - 01 :00 0.50 CASE P COMP ORIENT TOOL TO HIGH SIDE - RIH TO 8842' - LATCH
ONTO WHIPSTOCK - PULL TO 165K - OBSERVE WELL-
WELL STATIC - PULL 5 STANDS - PUMP DRY JOB
01 :00 - 04:00 3.00 CASE P COMP POOH TO BHA
04:00 - 06:00 2.00 CASE P COMP LAY DOWN MWD - BAKER RETRIEVING ASSY - LAY DOWN
WHIPSTOCK - LAY DOWN RETRIEVING TOOLS
06:00 - 06:30 0.50 CASE P COMP RIG UP CASING TOOLS - PJSM
06:30 - 10:00 3.50 CASE P COMP PICK UP 89 JTS 4.5" 12.6# L-80 SLOTTED LINER - 13 JTS
4.5" 12.6# L-80 SOLID LINER - (TOTAL RUN 102 JTS)(TOTAL
FOOTAGE RUN 4091') - BAKER HOOK WALL HANGER
WITH 6' TIE BACK SLEEVE -
10:00 - 14:30 4.50 CASE P COMP RIH WITH LINER ON 4" DP TO 12911' - RAN 13 STANDS OF
4.75" DC'S /3.5" HWDP 15 STANDS FROM SURFACE FOR
Printed: 10/21/2002 8:51:00AM
')
')
BP EXPLORATION
Operations Summary Report
Page 6 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/14/2002 10:00 - 14:30 4.50 CASE P COMP ADDITIONAL WEIGHT - LINER WENT TO BTM WITHOUT
ORIENTION AT WINDOW - HOOK LINER 1ST ATTEMPT ON
WINDOW
14:30 - 16:00 1.50 CASE P COMP PUMP BALL TO SEAT - PRESSURE UP TO 2700 PSI-
RELEASE BAKER HR SETTING TOOL - BLEED PRESSURE
TO 0 - VERIFY RELEASE WITH 6' PICK UP - BLOW BALL
SEAT - OPEN CIRC SUB WITH 3700 PSI
16:00 - 16:30 0.50 CASE P COMP POOH 60' - CBU - OBSERVE WELL - WELL STATIC - PUMP
DRY JOB
16:30 - 17:30 1.00 CASE P COMP POH - STAND BACK 41 STANDS DRILL PIPE
17:30 - 22:30 5.00 CASE P COMP POH LAYING DOWN 4" DRILL PIPE - (132 JTS) -15 4.75"
DC'S - 15 JTS HWDP 3.5" - LAY DOWN LINER RUNNING
TOOL - (TOTAL STANDS IN DERRICK 95 - TOTAL
FOOTAGE 8876')
22:30 - 23:00 0.50 BOPSUR P COMP PULL WEAR RING
23:00 - 00:00 1.00 BOPSUR P COMP RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250
LOW 5 MINS - 2500 HIGH 5 MINS - ALL OTHER TEST 250
LOW 5 MINS - 4000 HIGH 5 MINS - UPPER IBOP - LOWER
IBOP - FLOOR SAFETY VALVES
10/15/2002 00:00 - 02:30 2.50 BOPSUR P COMP TEST BOPS - PIPE RAMS - BLIND RAMS - CHOKE
MANIFOLD - HYD VALVE ON CHOKE - HYD VALVE ON KILL
- MANUAL VALVE ON CHOKE - MANUAL VALVE ON KILL-
ALL TEST WERE GOOD - TEST PRESSURE 250 LOW 5
MINS - 4000 HIGH 5 MINS - (JEFF JONES WITH AOGCC
WITNESSED THE BOP TEST)
02:30 - 03:00 0.50 BOPSUR P COMP RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG -
INSTALL WEAR RING
03:00 - 06:00 3.00 RUNCOrvP COMP MAKE UP 3.5" MULE SHOE - RIH
06:00 - 07:30 1.50 RUNCOrvP COMP CUT DRILL LINE AND SERVICED TOP DRIVE
07:30 - 11 :00 3.50 RUNCOrvP COMP DISPLACED MUD IN HOLE WITH 600 BBLS OF 8.8 #/GAL
OF NACL AND FOLLOWED WITH 450 BBLS OF 9.2 #/GAL
NACL. PUMPED 120 SPM AND ROTATED PIPE AT 120 RPM
WORKED PIPE FULL STAND. 9.2 BRINE PREHEATED TO
120 DEGREES BEFORE DISPLACEMENT
11 :00 - 18:30 7.50 RUNCOrvP COMP LAYING DOWN DRILL PIPE, PULL WEAR RING, HOLE
TAKING 9.2 BRINE AT THE RATE OF 4 BBLS HR.
18:30 - 19:00 0.50 RUNCOrvP COMP PJSM, RIG UP TO RUN TUBING
19:00 - 00:00 5.00 RUNCOrvP COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP
COMPLETION TOTAL JTS RUN 55 JTS 2300 FT
RUNNING TUBING AT A SLOWER PACE THE NORMAL,
WITH THE HOLE TAKING BRINE.
LOST TOTAL OF 40 BBLS OF BRINE TO WELL
10/16/2002 00:00 - 07:00 7.00 RUNCOrvP COMP PICKING UP 4.5 12.6# L-80 IBT TUBING AND JET PUMP
COMPLETION TOTAL JTS RUN 196 JTS P/U WT 92K S/O
WT 65K
07:00 - 08:00 1.00 RUNCOrvP COMP PICK UP HANGER AND TIE IN 1- WIRE, LAND TUBING,
PACKER DEPTH 8123, GLM DEPTH 2214, XN NIPPLE 8168,
JET PUMP SENSOR 8095, SLIDING SLEEVE 8076,
PRESSURE GAUGE 8055
08:00 - 08:30 0.50 RIGD P COMP TEST TWC TO 1000 PSI
08:30 - 10:00 1.50 RIGD P COMP CHANGE RAMS TO 5" NIPPLE DOWN BOPS
10:00 - 11 :30 1.50 RIGD P COMP NIPPLE UP ADAPTER FLANGE, TEST ADAPTER FLANGE
TO 5,000 PSI
Printed: 10/21/2002 8:51:00 AM
')
')
BP EXPLORATION
Operations Summary Report
Page 7 of 7
Legal Well Name: MPS-29
Common Well Name: MPS-29 Spud Date: 9/30/2002
Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 10/16/2002
Contractor Name: DOYON Rig Release: 10/16/2002
Rig Name: DOYON 141 Rig Number: 141
Date From - To Hours Task Code NPT Phase Description of Operations
10/16/2002 11 :30 - 12:30 1.00 RIGD P COMP NIPPLE UP 41/16 CIW TREE AND TEST TO 5,000 PSI
12:30 - 13:00 0.50 RIGD P COMP PULL TWC WITH LUBRICATOR
13:00 - 17:30 4.50 RIGD P COMP RIG UP HB&R CIRC 9.3 BRINE AND WARM TO 100
DEGREES
17:30 - 18:30 1.00 RIGD P COMP DROP BALL, PRESSURE UP TO 4,000 PSI TO SET PACKER
AND TEST TUBING, RECORD FOR 30 MIN.
18:30 - 19:30 1.00 RIGD P COMP BLEED PRESSURE IN TUBING TO 3,000 PSI AND
PRESSURE ANNULUS TO 4,500 PSI, RECORDED FOR 30
MIN.
19:30 - 20:30 1.00 RIGD P COMP BLEED TUBING PRESS TO 2,000 AND SHEARED RP
VALVE, PUMP 82 BBLS OF DIESEL DOWN ANNLUS TO
FREEZE PROTECT WELL
20:30 - 22:00 1.50 RIGD P COMP LET DIESEL U-TUBE IN TO TUBING
22:00 - 22:30 0.50 RIGD P COMP RIG UP LUBRICATOR AND SET BPV
22:30 - 00:00 1.50 RIGD P COMP SECURE TREE, CLEAN CELLAR AND PITS
RIG RELEASE TO MOVE TO MPS-19 @ 24:0010/16/2002
Printed: 10/21/2002 8:51:00AM
')
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
Re: Distribution of Survey Data for Well MPS-29
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
0.00' M D (if applicable)
12,950.00' MD
31-0ct-02
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
aOd-J9s
RECE IVE'r",~ r~~
,~., !L.,;;/I
UOv 0 7 .:':
.. t;.....",
t-Jf:.~~k~ ......., <J
~"""'~..J \.l~, J;
" ~: .:,-~.-';j.Y:"-! ,
''''''<;~¡i~~7I
Sperry-Sun ørllling Services
Milne)(Po/".t Unit
8".
Miln ~. .t MPS
8Þ6".29
Job No. AK%Z221BQ, ", Survfþyect: 9 October, 2002
S~!;.eport
28
".,2002
Your Ref: API 600292311900
Surface Coordinates: 5999936.18 H, 5fiØ"70.94E (70° 24' 36.9759" H, 1490 27' 54.9398" W)
Grid Coordinate System:NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to P'9J~H R..rence: 999936.18 N, 65670.94 E (Grid)
Surface Coordlnates"./a.. ure: 32.89 S, 674.38 W(True)
Kelly Bushing' Mean Sea Level
Elevation ~" VReference: 66.60ft
Elevatlon ' cture: 66.6Oft
~'" 'é!"." '~~" ;f,'_,r." ,9".'~IJ,"¿, !'8,-,.."", ,1M
-....., ' "'",", ,- ' " .
£;I ,A' ~L;t.~'-'-~"'V I c:'e s
A Halliburton Company
DEF \JI T VE
---'
---
Survey Ref: svy10205
Sperry-Sun Drilling Services
Survey Report for MIlne Point MPS - MPS-29
Your Ref: API5OD292311900
Job No. AKZZ22160, surveyed: 9 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Verti~1 Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -66.60 0.00 O.OON O.OOE 5999936.18 N 565670.94 E 0.00 AK-1 BP _HG
178.00 0,080 44.900 111 .40 178.00 0.09N 0.09E 5999936.27 N 565671.03 E 0.045 0.08 AK-6 BP _IFR-AK
295.39 2,130 324.300 228.76 295.36 1.92 N 1.13W 5999938.09 N 565669.80 E 1.805 2.04
384.23 4.110 327.180 317.47 384.07 5.93N 3.82W 5999942.08 N 565667.07 E 2.235 6.34
472,94 5.770 326.360 405.84 472.44 12.32 N 8.01 W 5999948.43 N 565662.82 E 1.873 13.17
563.49 7,100 324.770 495.82 562.42 20.68 N 13.76 W 5999956.74 N 565657.00 E 1.482 22.14 --/
655.62 7.920 325.760 587.16 653.76 30.58 N 20.62 W 5999966.58 N 565650.06 E 0.901 32.77
750,33 11,590 328.340 680.49 747.09 44.08N 29.28 W 5999980.00 N 565641.27 E 3.901 47.18
843,52 13,910 328.000 771.37 837.97 61.54 N 40.14 W 5999997.37 N 565630.27 E 2.491 65.80
936,53 16,360 328.880 861.15 927.75 82.24 N 52.83 W 6000017.96 N 565617 .39 E 2.646 87.83
1029,34 17,670 328.870 949.89 1016.49 105.49 N 66.87 W 6000041.08N 565603.15 E 1.411 112.55
1123.93 18.900 326.850 1039.71 1106.31 130.61 N 82.67 W 6000066.05 N 565587.13 E 1 .463 139.34
1216.21 21,520 327.180 1126.30 1192.90 157.35 N 100.02W 6000092.64 N 565569.54 E 2.842 167.91
1310,11 26.160 326.830 1212.16 1278.76 189.17 N 120.69W 6000124.28 N 565548.59 E 4.944 201.92
1403,93 28.300 326.210 1295.58 1362.18 224.96 N 144.38 W 6000159.87 N 565524.59 E 2.301 240.23
1497.45 31.110 324.580 1376.80 1443.40 263.08 N 170.71 W 6000197.75 N 565497.92 E 3.126 281.16
1591.80 32,390 324.110 1457.03 1523.63 303.42 N 199.66 W 6000237.84 N 565468.62 E 1.382 324.59
1685.03 34.100 325.020 1535.00 1601.60 345.07 N 229.28 W 6000279.22 N 565438.64 E 1.911 369.40
1778.08 34.760 324,100 1611.75 1678.35 387.93 N 259.79 W 6000321.81 N 565407.75 E 0.903 415.51
1871.59 37.400 324,190 1687.32 1753.92 432.56 N 292.04 W 6000366.15 N 565375.11 E 2.824 463.59
1963.61 38,880 324.690 1759.69 1826.29 478.79 N 325.08 W 6000412.09 N 565341.66 E 1.643 513.36
2058.24 42.150 326.270 1831.63 1898.23 529.45 N 359.89 W 6000462.44 N 565306.41 E 3.622 567.72
2151.67 43.210 329.020 1900.32 1966.92 582.95 N 393.77 W 6000515.64 N 565272.06 E 2.295 624.80
2245,02 44.000 327.920 1967.91 2034.51 637.82 N 427.44 W 6000570.22 N 565237.91 E 1.173 683.21
2338.49 47.420 326.730 2033.17 2099.77 694.12 N 463.57 W 6000626.20 N 565201.28 E 3.771 743.33
2431 ,Tt 52.380 327,240 2093.24 2159.84 753.94 N 502.42 W 6000685.67 N 565161.91 E 5.334 807.26
2524,87 58.610 329.750 2145.96 2212.56 819.34 N 542.44 W 6000750.72 N 565121.32 E 7.050 876.88
2618,05 ö5,170 331.780 2189.84 2256.44 891.04 N 582.52 W 6000822.06 N 565080.61 E 7.297 952.75
2711,96 66.510 332.400 2228.28 2294.88 966.76 N 622.62W 6000897.42 N 565039.84 E 1.549 1032.62
2805.42 64,950 332.600 2266.69 2333.29 1042.33 N 661.96W 6000972.65 N 564999.84 E 1.681 1112.25
2898,99 ö7,190 331 .270 2304.64 2371.24 1117.78 N 702.20 W 6001047.75 N 564958.94 E 2.724 1191.88
2992,23 l2,640 331.530 2336.65 2403.25 1194.64 N 744.10W 6001124.23 N 564916.36 E 5.851 1273,09
3085.49 /3.140 330.790 2364.09 2430.69 1272.72 N 787.10 W 6001201.93 N 564872.68 E 0.929 1355.64
3175,56 70,240 331.640 2392.38 2458.98 1347.65 N 828.27W 6001276.50 N 564830.85 E 3.342 1434.85
3268.62 69)170 332,090 2424.66 2491.26 1424.62 N 869.43W 6001353.10 N 564789.02 E 1.236 1516.08
28 October, 2002 - 15:14 ~age 20f8 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29
Your Ref: API 500292311900
Job No. AKZZ2216D, Surveyed: 9 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth, Northings eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3362.37 69,420 331.750 2457.81 2524.41 1501.99 N 910.71 W 6001430.10 N 564747.06 E 0,432 1597.73
3455.52 68,970 332.030 2490.89 2557.49 1578.79 N 951.74 W 6001506.55 N 564705.36 E 0.559 1678.79
3549,02 68,380 332.150 2524.89 2591.49 .. 1655.76 N 992.50 W 6001583.15 N 564663.91 E 0.642 1759.97
3642.36 72,060 329.170 2556,48 2623.08 1732.29 N 1035.55 W 6001659.30 N 564620.20 E 4.956 1840.99
3735.47 74,170 328.650 2583.52 2650.12 1808.58 N 1081.56 W 6001735.18 N 564573.52 E 2.328 1922.12
3828,71 71,320 328.170 2611.18 2677.78 1884.43 N 1128.20W 6001810.61 N 564526.22 E 3.096 2002.87 ~'
3922.26 "12.620 327.890 2640.13 2706.73 1959.89 N 1175.30 W 6001885.66 N 564478.46 E 1.418 2083.30
4016.54 72,040 328.590 2668.75 2735.35 2036.27 N 1222.58 W 6001961.62 N 564430.50 E 0.938 2164.66
4110.04 72.750 328.570 2697.03 2763.63 2112.32 N 1269.04 W 6002037.26 N 564383.38 E 0.760 2245.60
4204.02 70.540 328.110 2726.62 2793.22 2188.24 N 1315.85 W 6002112.76 N 564335.90 E 2.397 2326.45
4297.17 69.990 328.260 2758.08 2824.68 2262.74 N 1362.07 W 6002186.86 N 564289.02 E 0.610 2405.83
4390.03 70.340 328.610 2789.59 2856.19 2337.17 N 1407.80 W 6002260.88 N 564242.65 E 0.517 2485.07
4480.89 69.500 328.580 2820.78 2887.38 2410.01 N 1452.27 W 6002333.32 N 564197.54 E 0.925 2562.58
4577.70 67,180 329.560 2856.51 2923.11 2487.18 N 1498.51 W 6002410.08 N 564150.61 E 2.574 2644.60
4670,64 70.140 329.950 2890.33 2956.93 2561.95 N 1542.11 W 6002484.48 N 564106.36 E 3.209 2723.95
4764.09 71 . 1 90 330.260 2921.27 2987.87 2638.40 N 1586.06 W 6002560.53 N 564061.74 E 1.166 2804.98
4857.47 71 .530 330.640 2951.11 3017.71 2715.37 N 1629.70 W 6002637.12 N 564017.43 E 0.530 2886.51
4950.94 71,650 330.870 2980.63 3047.23 2792.75 N 1673.02 W 6002714.12 N 563973.43 E 0.266 2968.41
5044,12 71.410 330.680 3010.15 3076.75 2869.88 N 1716.17 W 6002790.86 N 563929.60 E 0.322 3050.03
5137.90 71,730 330.340 3039.80 3106.40 2947.33 N 1759.97 W 6002867.92 N 563885.12 E 0.484 3132.05
5231.49 '71,840 330.250 3069.06 3135.66 3024.54 N 1804.02 W 6002944.75 N 563840.39 E 0.149 3213.86
5324,61 '70.400 331.330 3099.19 3165.79 3101.44 N 1847.02 W 6003021.26 N 563796.72 E 1.896 3295.24
541l.11 70.140 331.350 3130.64 3197.24 3178.39 N 1889.08W 6003097.84 N 563753.98 E 0.280 3376.56
69,920 330.850 3162.60 3229.20 3255.39 N 1931.59W 6003174.46 N 563710.80 E 0.554 ~~""
5511.35 3457.98
5604,68 70.870 331.490 3193.91 3260.51 3332.41 N 1973.98W 6003251.11 N 563667.73 E 1.206 3539.41
5698,53 '71.280 331.060 3224.35 3290.95 3410.26 N 2016.65 W 6003328.58 N 563624.38 E 0.615 3621.70
5791.90 71,350 330.260 3254.27 3320.87 3487.37 N 2059.99 W 6003405.30 N 563580.37 E 0.815 3703.32
5885.42 '71,590 329.240 3283.99 3350.59 3563.96 N 2104.66 W 6003481.50 N 563535.03 E 1.065 3784.59
5978.90 71.850 328.430 3313.31 3379.91 3639.91 N 2150.59 W 6003557.04 N 563488.43 E 0.869 3865,37
6072,Ol (i9.580 329.670 3344.08 3410.68 3715.32 N 2195.82 W 6003632.05 N 563442.54 E 2.741 3945.53
6165,54 68.930 329.280 3377.19 3443.79 3790.62 N 2240.22 W 6003706.96 N 563397.48 E 0.797 4025.48
6258.84 69,000 329.020 3410.68 3477.28 3865.38 N 2284.87 W 6003781.32 N 563352.17 E 0.271 4104,93
6352,21 69,960 328.320 3443.41 3510.01 3940.07 N 2330.34 W 6003855.61 N 563306.04 E 1.245 4184.40
6445,88 71 ,090 328.240 3474.63 3541.23 4015.19 N 2376.17 W 6003930.32 N 563258.95 E 1.209 4264.41
6539,20 72 .ß90 328.260 3503,64 3570.24 , 4090.61 N 2423.45 W 6004005.33 N 563211.62 E 1.715 4344.75
28 October, 2002 - 15:14 Page 3 of 8. DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for MIlne PoInt MPS - MPS-29
Your Ref: API 500292311900
Job No. AKZZ2216Ø, Surveyed: 9 October, 2002
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth. Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOtt)
6632.4 1 71 ,130 329.260 3532.58 3599.18 4166.36 N 2469.40 W 6004080.67 N 563165.00 E 1.960 4425.33
6726.06 69.640 329.590 3564.02 3630.62 4242.31 N 2514.27 W 6004156.22 N 563119.47 E 1.625 4505.98
6819.22 69210 329.520 3596.76 3663.36 .. 4317.50 N 2558.46 W 6004231.02 N 563074.61 E 0.467 4585.80
6912.45 70.400 329.460 3628.94 3695.54 4392.88 N 2602.88 W 6004306.01 N 563029.53 E 1278 4665.84
7006.23 69.690 329.840 3660.95 3727.55 4468.95 N 2647.42 W 6004381.68 N 562984.32 E 0.847 4746.57
7097.96 69.910 329.790 3692.62 3759.22 4543.37 N 2690.71 W 6004455.71 N 562940.39 E 0245 4825.52 ~
7189.84 70.440 329.670 3723.78 3790.38 4618.02 N 2734.28 W 6004529.98 N 562896.16 E 0.590 4904.73
7286.43 69.820 332.120 3756.62 3823.22 4697.38 N 2778.46 W 6004608.95 N 562851.28 E 2.470 4988.69
7379,75 70.520 332.610 3788.28 3854.88 4775.15 N 2819.18 W 6004686.36 N 562809.88 E 0.898 5070.67
7482.64 72.030 332.250 3821.30 3887.90 4861.52 N 2864.28 W 6004772.33 N 562764.02 E 1.505 5161.71
7575.89 71.010 335.040 3850.87 3917.47 4940.76 N 2903.54 W 6004851.22 N 562724.07 E 3.041 5244.97
7668.53 70.580 335.150 3881.34 3947.94 5020.11 N 2940.38 W 6004930.24 N 562686.53 E 0.478 5328.07
7762.44 70.740 335.200 3912.44 3979.04 5100.53 N 2977.59 W 6005010.33 N 562648.62 E 0.178 5412.27
7855.75 69.390 335.390 3944.26 4010.86 5180.22 N 3014.25 W 6005089.70 N 562611.26 E 1.459 5495.68
7949.49 68.540 334.650 3977.90 4044.50 5259.53 N 3051.20 W 6005168.68 N 562573.62 E 1.168 5578.75
8043.49 67.640 334.240 4012.98 4079.58 5338.21 N 3088.81 W 6005247.02 N 562535.31 E 1.039 566127
8137,17 69.920 333.290 4046.88 4113.48 5416.53 N 3127.42 W 6005325.00 N 562496.01 E 2.611 5743.55
8230,07 78.470 332.890 4072.16 4138.76 5496.16 N 3167.84 W 6005404.27 N 562454.89 E 9.213 5827.35
8276.37 82.100 332.800 4079.98 4146.58 5536.76 N 3188.67 W 6005444.69 N 562433.71 E 7.843 5870.09
8324.00 87.050 333.090 4084.48 4151.08 5578.97 N 3210.23 W 6005486.71 N 562411.78 E 10.410 5914.53
8417.78 88.090 333.090 4088.45 4155.05 5662.52 N 3252.63 W 6005569.89 N 562368.64 E 1.109 6002.44
8510.71 88.210 333.330 4091.45 4158.05 5745.44 N 3294.50 W 6005652.43 N 562326.05 E 0.289 6089.66
8604.82 87.290 333.970 4095.15 4161.75 5829.70 N 3336.24 W 6005736.32 N 562283.57 E 1.191 617821
8698.90 86.120 335.120 4100.56 4167.16 5914.50 N 3376.60 W 6005820.77 N 562242.46 E 1.742 6267.13
8792.09 87.350 336.610 4105.86 4172.46 5999.41 N 3414.64 W 6005905.33 N 562203.68 E 2.071 6355.88
8884,77 87.780 339.670 4109.80 4176.40 6085.33 N 3449.12 W 6005990.95 N 562168.45 E 3.331 6445.24
8977,35 88.650 342.440 4112.69 4179.29 6172.85 N 3479.16 W 6006078.20 N 562137.64 E 3.135 6535.65
9070.85 88.460 345.680 4115.04 4181.64 6262.71 N 3504.82 W 6006167.83 N 562111.19 E 3.470 6627.89
9164,83 87.290 346.410 4118.53 4185.13 6353.85 N 3527.47 W 6006258.77 N 562087.74 E 1.467 6721.05
9184,60 87,350 346.190 4119.45 4186.05 6373.04 N 3532.15W 6006277.92 N 562082.89 E 1.152 6740.65
9261.40 86.930 349.550 4123.29 4189.89 6448.02 N 3548.26 W 6006352.75 N 562066.12 E 4.404 6817.00
9311.21 85,690 349.370 4126.50 4193.10 6496.95 N 3557.37 W 6006401.60 N 562056.58 E 2.512 6866.65
9355.40 86.500 353.790 4129.50 4196.10 6540.49 N 3.S1,.W 6006445.08 N 562049.76 E 10.160 6910.64
9402.05 89.080 358.030 4131.30 4197.90 6566.91N .t3W 6006491.53 N 562046.03 E 10.633 695720
9448.07 90.490 2200 41 31.48 4198.08 6632.98 N 7.04W 6006537.54 N 562045.71 E 9.565 7002.88
------.-
28 October, 2002 - 15:14 P"g. 4 of 11 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29
Your Ref: API 500292311900
Job No. AKZZ22160, Surveyed: 9 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertica' Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Ealstlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9499.02 91.290 6.200 4130.68 4197.28 6683.77 N 3563.31 W 6006588.37 N 562049.00 E 8.005 7052,90
9541,95 90,550 10.350 4129.99 4196.59 6726.24 N 3557.13 W 6006630.89 N 562054.80 E 9.818 7094.36
9591 ,82 89,750 16.730 4129.86 4196.46 .' 6774.70 N 3545.47 W 6006679.45 N 562066.04 E 12.893 7141.13
9634.77 88.950 22.480 4130.35 4196.95 6815.14 N 3531.06 W 6006720.01 N 562080.09 E 13.516 7179.62
9687,74 90,000 29.090 4130.84 4197.44 6862.81 N 3508.03 W 6006767.88 N 562102.70 E 12.635 7224.29
9728.88 90.620 34.920 4130.61 4197.21 6897.68 N 3486.24 W 6006802.94 N 562124.19 E 14.251 7256.39 -'
9780.92 90.120 41.670 4130.28 4196.88 6938.50 N 3454.01 W 6006844.04 N 562156.06 E 13.006 7293.18
9823.06 89.750 46.780 4130.33 4196.93 6968.68 N 3424.63 W 6006874.48 N 562185.17 E 12.158 7319.74
9869.66 90.250 53.410 4130.33 4196.93 6998.56 N 3388.90 W 6006904.67 N 562220.64 E 14.268 7345.26
9915.20 89.260 55.770 4130.52 4197.12 7024.95 N 3351.79 W 6006931.38 N 562257.51 E 5.620 7367.15
9963.46 88.220 54.600 4131.58 4198.18 7052.49 N 3312.18 W 6006959.28 N 562296.88 E 3.243 7389.90
10010,13 86.000 55.610 4133.93 4200.53 7079.16 N 3273.95 W 6006986.28 N 562334.87 E 5.225 7411.94
10058.74 85.690 55.510 4137.46 4204.06 7106.57 N 3233.97 W 6007014.04 N 562374.61 E 0.670 7434.52
10103.55 85.630 54.950 4140.85 4207.45 7132.06 N 3197.26 W 6007039.85 N 562411.09 E 1.253 7455.56
10152.40 86.490 54.040 4144.20 4210.80 7160.36 N 3157.59 W 6007068.50 N 562450.51 E 2.560 7479.05
10197,03 86.430 54.050 4146.96 4213.56 7186.51 N 3121.53 W 6007094.97 N 562486.34 E 0.136 7500.84
10245.35 86.980 53.340 4149.74 4216.34 7215.08 N 3082.66 W 6007123.87 N 562524.96 E 1.857 7524.68
10290,30 85.200 52.840 4152.80 4219.40 7242.01 N 3046.80 W 6007151.12 N 562560.58 E 4.113 7547.26
10338.83 85.310 52.770 4156.82 4223.42 7271.24 N 3008.27 W 6007180.69 N 562598.85 E 0.268 7571.82
10383,76 85,620 52.010 4160.37 4226.97 7298.58 N 2972.79 W 6007208.34 N 562634.09 E 1.822 7594.84
10433.21 85.260 52.050 4164.30 4230.90 7328.91 N 2933.93 W 6007239.00 N 562672.68 E 0.732 7620.44
10477.18 85.190 52.110 4167.96 4234.56 7355.83 N 2899.37 W 6007266.24 N 562707.01 E 0.209 7643.16
10527,31 85.000 51.680 4172.25 4238.85 7386.66 N 2860.07 W 6007297.40 N 562746.04 E 0.935 7669.20
10571.44 84.710 51.640 4176.20 4242.80 7413.92 N 2825.59 W 6007324.97 N 562780.27 E 0.663 7692.27 ~
10620.87 86.430 49.710 4180.02 4246.62 7445.15 N 2187.47 W 6007356.53 N 562818.11 E 5.221 7718.86
10663,72 86.490 49.020 4182.67 4249.27 7473.00 N 2755.02 W 6007384.67 N 562850.32 E 1.613 7742,74
10714.38 88,340 47.670 4184.95 4251.55 7506.64 N 2117.21 W 6007418.63 N 562887.83 E 4.519 7771.75
10757.fJ1 87.300 46.620 4186.57 4253.17 7535.61 N 2685.98 W 6007447.88 N 562918.81 E 3.465 7796.90
10807.65 87.660 46.610 4188.80 4255.40 7570.36 N 2649.21 W 6007482.95 N 562955.27 E 0.711 7827.13
10851.17 88.220 47.460 4190.37 4256.97 7600.00 N 2$17.39W 6007512.87 N 562986.83 E 2.338 7852.87
10899,60 88.710 46.980 4191.66 4258.26 7632.88 N 2581.85 W 6007546.07 N 563022.07 E 1.416 7881.40
10944,30 85.200 47.100 4194.04 4260.64 7663.30 N ~649.19 W 6007576.77 N 563054.46 E 7.857 7907.81
10994.26 87.660 47.190 4197.15 4263.75 7697.21 N 2.64W 6007611.00 N 563090.72 E 4.927 7937.24
11037,88 87.540 46.830 4198.97 4265.57 7726.93N .76W 6007640.99 N 563122.33 E 0.869 7963.04
11086.40 88,,950 47.520 4200.46 4267.06 7759.89N 5.19W 6007674.27 N 563157.61 E 3.235 7991.65
---
28 October, 2002 - 15:14 Page 50fB DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey R(port for Milne Point MPS - MPS-29
Your Ref: API 500292311900
Job No. AKZZ221fØ, Surveyed: 9 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11130,91 89,320 47,150 4201.13 4267.73 7790.05 N 2412.47 W 6007704.72 N 563190.07 E 1.176 8017.80
11179,80 90,310 46.710 4201.29 4267.89 7823.44 N 2376.75 W 6007738.42 N 563225.49 E 2.216 8046.80
11225,11 90.490 46.740 4200.97 4267.57 .. 7854.50 N 2343.77 W 6007769.77 N 563258.20 E 0.403 8073.81
11274.24 89.940 45.990 4200.79 4267.39 7888.40 N 2308.21 W 6007803.98 N 563293.46 E 1.893 8103.35
11317.50 90.990 46.830 4200.44 4267.04 7918.23 N 2276.88 W 6007834.08 N 563324.53 E 3.108 8129.33
11365.23 86.620 44.950 4201.43 4268.03 7951.43 N 2242.62 W 6007867.58 N 563358.49 E 9.966 8158.32 -
11410.77 84.520 44.870 4204.95 4271.55 7983.58 N 2210.57 W 6007900.02 N 563390.26 E 4.615 8186.53
11459.91 83.770 44.960 4209.96 4276.56 8018.20 N 2176.06 W 6007934.94 N 563424.47 E 1.537 8216.90
11504,14 85,940 44.570 4213.93 4280.53 8049.48 N 2145.04 W 6007966.48 N 563455.21 E 4.984 8244.35
11555.35 88,520 44.410 4216.40 4283.00 8085.96 N 2109.20 W 6008003.28 N 563490.73 E 5.048 8276.42
11597,85 88.950 44.900 4217.34 4283.94 8116.19 N 2079.33 W 6008033.77 N 563520.32 E 1.534 8302.97
11647,80 88.400 44.470 4218.50 4285.10 8151.69 N 2044.22 W 6008069.58 N 563555.13 E 1.398 8334.14
11690.63 86.500 43.400 4220.40 4287.00 8182.50 N 2014.53 W 6008100.65 N 563584.54 E 5.090 8361.29
11745.20 86.430 43.650 4223.77 4290.37 8221.99 N 1977.02 W 6008140.47 N 563621.70 E 0.475 8396,15
11784,63 84,580 43.970 4226.86 4293.46 8250.36 N 1949.81 W 6008169.08 N 563648.66 E 4.761 8421.16
11832.66 87.470 44.190 4230.19 4296.79 8284.78 N 1916.48 W 6008203.78 N 563681.69 E 6.034 8451.47
11877.77 86.980 43.340 4232.37 4298.97 8317.31 N 1885.32 W 6008236.60 N 563712.57 E 2.173 8480.16
11925.85 87.110 43.820 4234.85 4301.45 8352.10 N 1852.22 W 6008271.67 N 563745.36 E 1.033 8510.86
11970.82 86.990 42.930 4237.16 4303.76 8384.74 N 1821.37 W 6008304.58 N 563775.91 E 1.994 8539.69
12018.25 86.430 42.050 4239.89 4306.49 8419.66 N 1789.39 W 6008339.78 N 563807.59 E 2.197 8570.65
12064.63 88.340 42.890 4242.00 4308.60 8453.83 N 1758.11 W 6008374.23 N 563838.57 E 4.498 8600.95
12117,97 88.520 42.840 4243.46 4310.06 8492.91 N 1721.83 W 6008413.63 N 563874.50 E 0.350 8635.55
12157,36 88.950 44.660 4244.33 4310.93 8521.36 N 1694.60 W 6008442.31 N 563901.48 E 4.747 8660.63
12205.88 89.140 45.280 4245.14 4311.74 8555.68 N 1660.32 W 6008476.93 N 563935.46 E 1.336 8690.73 ~
12251.13 89.080 43.630 4245.85 4312.45 8587.98 N 1628.63 W 6008509.50 N 563966.86 E 3.648 8719.12
12297.90 89.080 42.440 4246.60 4313.20 8622.16 N 1596.72 W 6008543.96 N 563998.47 E 2.544 8749.36
12332,69 89.080 42,300 4247.15 4313.75 8647.86 N 1513.28 W 6008569.87 N 564021.69 E 0.402 8772.16
12391.26 91.230 43.590 4247.00 4313.60 8690.73 N 1533.38 W 6008613.09 N 564061.21 E 4.281 8810.10
12436,12 90.000 41.860 4246.51 4313.11 8723.68 N 1502.94 W 6008646.31 N 564091.35 E 4.732 8839.28
12488.20 91.050 42.230 4246.04 4312.64 8762.35 N 1468.07 W 6008685.28 N 564125.89 E 2.138 8873.64
12529.41 90.860 42,380 4245.35 4311.95 8792.82 N 1440.33 W 6008716.00 N 564153.35 E 0.587 8900.68
12580.32 90.740 40.890 4244.64 4311.24 8830.87 N 1.406.51W 6008754.34 N 564186.83 E 2.936 8934.53
12625.50 90,920 41 .450 4243.99 4310.59 8864.88 N 1376.77 W 6008788.61 N 564216.27 E 1.302 8964.85
12675.30 89.690 41 .320 4243.72 4310.32 8902.24 N 1343.85 W 6008826.26 N 564248.87 E 2.484 8998.13
12718.07 881280 39.430 4244.48 4311.08 8934.81 N 1316.15W 6008859.08 N 564276.28 E 5.513 9027.26
28 October, 2002 - 15:14 R,ge 6 of 1I DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for MIlne Point MPS - MPS-29
Your Ref: AP/5D0292311900
Job No. AKZZ221fSO, Surveyed: 9 Oc:tober, 2002
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
Local Coordinates
Northings Eastings
(ft) (ft)
Incl.
Azim.
4312.73 8973.29 N 1284.92 W
4314.23 9007.64 N 1257.72 W
4315.27 .. 9046.53 N 1226.92 W
4315.10 9062.49 N 1214.06W
4313.26 9115.60 N 'l171.02 W
. ~ ~
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes. Zone 4.
The Dogleg Severity is in Degrees per 1°° feet (US).
Vertical Section is from Well and calculated along an Azimuth of 353.3209 (True).
12767,66 87.910
12811,49 88.150
12861,12 89,450
12881.61 91.540
12950.00 91.540
38,710
38.030
38.720
39.020
39.020
4246.13
4247.63
4248.67
4248.50
4246.66
Magnetic Declination at Surface is 25.734°(29-Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.00ft.,
The Bottom Hole Displacement is 9190.51f1., in the Direction of 352.680° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
12950,00
4313.26
9115.60 N
Projected Survey
1171.02 W
28 October, 2002 - 15:14
:p.ge 7 Of 8
Global Coordinates
Northings Eastings
(ft) (ft)
6008897.83 N
6008932.41 N
6008971.58 N
6008987.64 N
6009041.13 N
564307.18 E
564334.06 E
564364.52 E
564377.24 E
564419.81 E
BPXA
Dogleg
Rate
(9/100ft)
Vertical
Section
Comment
1.632 9061.84
1.644 9092.79
2.965 9127.84
10.305 9142.19
0.000 9189.94 Projected Survey
'-
~~
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne PoInt MPS - MPS-29
Your Ref: API 51)0292311900
Job No. AKZZ22160, Surveyed: 9 October, 2002
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Survey tool program for MPS-29
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
178.00
0.00 178.00
178.00 12950.00
178.00 AK-1 BP _HG
4313.26 AK-6 BP _IFR-AK
~'
'---~
28 October, 2002 - 15:14
~ge B.o',8
DrillQuest 3.03.02.002
)
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
Re: Distribution of Survey Data for Well MPS-29MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window I Kickoff Survey
Projected Survey:
0.00' MD
0.00' M D (if applicable)
12,950.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
31-0ct-02
j:J i-' "''4 ~
B', v~= f ,'r...':' i \ l'"¡' -" ~'"'"
~ ~f. i- ~ IV i":; fLJ
',ro; I
II¿ \r 0 7
",
~~-~:¡'j~:~.~~¥;,~)
..'-'.'.II~a&
~tB--ICj 5
.,,-
Sperry-Sun ~ .
.,8èrvices
~
Job No. AKMW22160, SU"'éYØd: 9 OCtober, 2002
Survey
fJort
28 OctQbe'lÞ02
Your Ref: AÞt 31-1WO
Surface Coordinates: 5999936.18 N, 5656tO.94. . 24~36.9759" N, 149027' 54.9398" W)
Grid Coordinate System: NAD27 Atilslta State Pltínes, Zone 4
"-"
Surface Coordinates relative to Project H Reftrénce:999936.18 ~ 65670.94 E (Grid)
Surface Coordinates relative to StrUcture: 32.89 S, 674.38 W(True)
Kelly Bushing: 66.6Dft abôve Mean Sea Level
Elevation relative to ProjecfVReference: 66.6Oft
Elevation relative to Structure: 66.6Oft
Si' ""I'1c,~1IUI1
D~.LL'NG s...v.ces
A HatJIburton Company
Survey Ref: 5vy10207
Sperry-Sun"ll/l' a.".¡ces
Survey Report for MI/ít,'P " S-ÍtfPS..29MWD
Your Ref: ",' 119tJÐ
Job No. AKMW22160," 'Survè1fÞl1: 9 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordlnà. Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs ':-'1'19$ Northh'IGs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (It) (ft) (ft) (0/100ft)
0.00 0,000 0.000 -66.60 0.00 O.OON O.OOE 5999936.18 N 565670.94 E 0.00 AK-1 BP HG
178.00 0.080 44.900 111.40 178.00 0.09N 0.09E 5999936.27 N 565671.03 E 0.045 0.08 MWD Magnetic
295.39 2.130 324.790 228.76 295.36 1.93 N 1.11 W 5999938.10 N 565669.81 E 1.804 2.04
384.23 4.110 327.610 317.47 384.07 5.97N 3.77W 5999942.11 N 565667.12 E 2.235 6.36
472.94 5.770 327.340 405.84 472.44 12.41 N 7.88W 5999948.52 N 565662.95 E 1.871 13.24
563.49 7.100 325.570 495.82 562.42 20.85 N 13.50 W 5999956.91 N 565657.26 E 1.485 22.28 -
655.62 7.920 327.010 587.16 653.76 30.87 N 20.18 W 5999966.88 N 565650.49 E 0.913 33.01
750.33 11.590 329.700 680.49 747.09 44.57 N 28.53W 5999980.49 N 565642.02 E 3.904 47.58
843.52 13.910 329.130 771.37 837.97 62.27 N 39.00 W 5999998.10 N 565631.39 E 2.493 66.38
936.53 16.360 329.250 861.15 927.75 83.12 N 51.44W 6000018.85 N 565618.77 E 2.634 88.54
1029.34 17.670 329.470 949.89 1016.49 106.49 N 65.28W 6000042.09 N 565604.73 E 1.413 113.36
1123.93 18.900 327.590 1039.71 1106.31 131.79N 80.78 W 6000067.25 N ' 565589.00 E 1.442 140.29
1216.21 21.520 327.690 1126.30 1192.90 158.72 N 91.84W 6000094.03 N 565571.71 E 2.839 169.02
1310.11 26.160 326.410 1212.16 1278.76 190.53 N 118.51 W 6000125.66 N 565550.76 E 4.972 203.02
1403.93 28.300 326.230 1295.58 1362.18 226.25 N 142.32 W 6000161.17 N 565526.64 E 2.283 241.27
1497.45 31.110 324.020 1376.81 1443.41 264.24 N 168.84 W 6000198.92 N 565499.78 E 3.224 282.09
1591.80 32.390 323.620 1457.04 1523.64 304.31 N 198.15 W 6000238.74 N 565470.12 E 1.375 325.29
1685.03 34.100 322.970 1535.00 1601.60 345.28 N 228.70 W 6000279.44 N 565439.21 E 1.874 369.54
1778.08 34.760 322.730 1611.75 1678.35 387.21 N 260.47 W 6000321.09 N 565407.07 E 0.724 414.89
1871.59 37.400 323.120 1687.32 1753.92 431.15 N 293.67 W 6000364.73 N 565373.49 E 2.834 462.38
1963.61 38.880 323.620 1759.69 1826.29 476.76 N 327.57W 6000410.04 N 565339.19 E 1.643 511.63
2058.24 42.150 325.080 1831.63 1898.23 526.72 N 363.37W 6000459.68 N 565302.95 E 3.598 565.41
2151.67 43.210 328.520 1900.32 1966.92 579.71 N 398.02 W 6000512.37 N 565267.83 E 2.741 622.07 ~
2245.02 44.000 324.930 1967.93 2034.53 633.51 N 433.35 W 6000565.85 N 565232.04 E 2.784 679.62
2338.49 47.420 328.040 2033,19 2099.79 689.30 N 470.23 W 6000621.32 N 565194.66 E 4.365 739.32
2431.77 52.380 328.150 2093.26 2159.86 749.85 N 507.93 W 6000681.54 N 565156.44 E 5.318 803.85
2524.87 58.610 329.590 2145.97 2212.57 815.51 N 547.54 W 6000746.85 N 565116.25 E 6.812 873.67
2618.05 65.170 332.500 2189.86 2256.46 887.41 N 587.25 W 6000818.39 N 565075.91 E 7.559 949.69
2711,96 66.510 332.540 2228.30 2294.90 963.42 N 626.78 W 6000894.05 N 565035.71 E 1.427 1029.79
2t305.42 64.950 331.000 2266.71 2333.31 1038.49 N 667.08 W 6000968.76 N 564994.76 E 2.245 1109,03
2898. 99 67.190 330.910 2304.66 2371.26 1113.25 N 708.60 W 6001043.16 N 564952.58 E 2.396 1188.12
2992.23 72.640 330.540 2336.67 2403.27 1189.61 N 751.41 W 6001119.13 N 564909.10 E 5.857 1268.94
3085.49 73,140 330.520 2364.11 2430.71 1267.21 N 795.26 W 6001196.34 N 564864.57 E 0.537 1351.11
3'175.56 70.240 333.610 2392.41 2459.01 1342.72 N 835.32 W 6001271.51 N 564823.84 E 4.579 1430,78
3268,62 69,170 334.350 2424,69 2491.29 1421.16 N 873.61 W 6001349.60 N 564784.87 E 1.370 1513,13
---_._-----._-_._--'-~-. --> ---_.~-~_. "---_.. ~----- -----~~.._._---..-~------_._.._-------- _.--._-.-_._---~-_.-------
28 October, 2002 - 15:25 Page 20f8 DrmQuest .1.03.02.002
Sperry-SuniD'~I_>~øPJì;ces
Survey Report for MHnepóf(l'?MÞs.MPS..29:MWD
Your Ref: API=litJó2Ø3119lÎO
Job No. AKMW22160, Sumýed: 9 October, 2002
BP EXPLORA r/ON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates GlObal Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1ooft)
3362.37 69.420 334.420 2457.83 2524.43 1500.23 N 911.52W 600>1428.34 N 564746.26 E 0.276 1596.08
3455.52 68.970 333.590 2490.92 2557.52 1578.50 N 949.69W 6001506:27 N 564707.41 E 0.963 1678.25
3549.02 68.380 333.050 2524.92 2591.52 1656.32 N 988.79 W 6001583.75 N 564667.62 E 0.829 1760.10
3642.36 72.060 330.630 2556.51 2623.11 1733.73 N 1030.25 W 6001660.78 N 564625.48 E 4.636 1841.80
3735.4 7 74.170 329.060 2583.55 2650.15 1810.76 N 1075.01 W 6001737.42 N 564580.05 E 2.782 1923.51
-
3828.71 71.320 327.670 2611.21 2677.81 1886.56 N 1121.70 W 6001812.81 N 564532.69 E 3.372 2004.24
3922.26 72.620 327.930 2640.16 2706.76 1961.84 N 1169.10W 6001887.66 N 564484.63 E 1.415 2084.51
4016.54 72.040 328.520 2668.78 2735.38 2038.20 N 1216.41 W 6001963.61 N 564436.66 E 0.857 2165.86
4110.04 72.750 328.330 2697.06 2763.66 2114.13 N 1263.07 W 6002039.12 N 564389.33 E 0.784 2246.70
4204.02 70.540 328.420 2726.65 2793.25 2190.08 N 1309.84 W 6002114.66 N 564341.89 E 2.353 2327.58
4297.17 69.990 328.400 2758.10 2824.70 2264.76 N 1355.77 W 6002188.94 N 564295.31 E 0.591 2407.10
4390.03 70.340 328.420 2789.61 2856.21 2339.17 N 1401.53 W 6002262.94 N 564248.90 E 0.377 2486.32
4480.89 69.500 329.200 2820.81 2887.41 2412.17 N 1445.72W 6002335.55 N 564204.06 E 1.227 2563.97
4577.70 67,180 330.520 2856.54 2923.14 2489.97 N 1490.90 W 6002412.94 N 564158.20 E 2.711 2646.49
4670.64 70.140 330.410 2890.36 2956.96 2565.28 N 1533.57W 6002487.88 N 564114.87 E 3.187 2726.26
4764.09 71 .190 330.710 2921.30 2987.90 2642.07 N 1576.91W 6002564.28 N 564070.86 E 1.164 2807.57
4857.47 71.530 331.160 2951.14 3017.74 2719.41 N 1619.90W 6002641.24 N 564027.19 E 0.584 2889.38
4950.94 71.650 331.000 2980.66 3047.26 2797.04 N 1662.79 W 6002718.49 N 563983.62 E 0.207 2971.47
5044.12 71.410 330.730 3010.18 3076.78 2874.23 N 1705.82 W 6002795.30 N 563939.92 E 0.377 3053.15
5137.90 71.730 330.210 3039.83 3106.43 2951.65 N 1749.67 W 6002872.33 N 563895.39 E 0.627 3135.14
5231.49 71.840 329.930 3069.08 3135.68 3028.69 N 1794.02W 6002948.98 N 563850.36 E 0.308 3216.82
5324.61 70.400 331.540 3099.22 3165.82 3105.55 N 1837.10W 6003025.45 N 563806.61 E 2.251 3298.16
5417.77 70.140 332.020 3130.67 3197.27 3182.81 N 1878.56 W 6003102.35 N 563764.46 E 0.560 3379.73 ~
5511.35 69.920 331.930 3162.63 3229.23 3260.45 N 1919.89 W 6003179.63 N 563722.46 E 0.252 3461.65
5604.68 70.870 332.430 3193.94 3260.54 3338.21 N 1960.92 W 6003257.02 N 563680.75 E 1.136 3543.65
5698.53 71.280 332.090 3224.38 3290.98 3416.78 N 2002.24 W 6003335.23 N 563638.73 E 0.555 3626.50
5791.90 71.350 331.310 3254.29 3320.89 3494.66 N 2044.11W 6003412.73 N 563596.12 E 0.795 3708.72
5885.42 71.590 329.990 3284.02 3350.62 3571.95 N 2087.63 W 6003489.63 N 563551.98 E 1.363 3790.54
5978.90 71 .850 329.200 3313.34 3379.94 3648.50 N 2132.56 W 6003565.79 N 563506.39 E 0.849 3871,80
6072.07 69.580 331.030 3344.11 3410.71 3724.74 N 2176.38 W 6003641.64 N 563461.90 E 3.061 3952,62
6165.54 68.930 330.880 3377.22 3443.82 3801.15 N 2218.82 W 6003717.68 N 563418.79 E 0.711 4033.45
6258,84 69.000 329.780 3410.71 3477.31 3876.82 N 2261.92W 6003792.96 N 563375.02 E 1.103 4113,61
6352.21 69.960 329.990 3443.44 3510.04 3952.46 N 2305.79 W 6003868.21 N 563330.48 E 1.050 4193.85
6445,88 71 .090 328.760 3474,67 3541.27 4028.45 N 2350.78 W 6003943.80 N 563284.83 E 1,729 4274.55
6539.20 72,690 328.590 3503.67 3570.27 4104.21 N 2396.89 W 6004019.16 N 563238.05 E 1.723 4355,17
----..---.-------.-.------.--.-.. -.--..----- --_..._-----~ ----~-_.~- ~_._---.-.---_. -_..__..---_._------~_u_---'-_.__._._---'-
28 October, 2002 - 15:25 Page30f8 DrillQuest 3.03.02.002
Sperry-SunDttl~: '/ices
Survey Report for MIlne' ,S-.'MWD
Your Ref: APlllltJftØ11100
Job No. AKAfW22160, Suff1Íy.(I:JObfober, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne PoInt Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
6632.41 71.130 328.880 3532.61 3599.21 4179.95 N 2442.88 W 6004094A8 N 563191.40 E 1.700 4435.73
6726.06 69.640 329.590 3564.05 3630.65 4255.74 N 2488.00 W 6004169.88 N 563145.61 E 1.744 4516.27
6819.22 69.210 329.180 3596.79 3663.39 4330.80 N 2532.42 W 6004244.55 N 563100.54 E 0.619 4595,98
6912.45 70.400 329.620 3628.98 3695.58 4406.11 N 2576.96 W 6004319.47 N 563055.34 E 1.351 4675.97
7006.23 69.690 329.150 3660.98 3727.58 4481.98 N 2621.85 W 6004394.93 N 563009.78 E 0.892 4756.53
7097.96 69.910 330.010 3692.66 3759.26 4556.21 N 2665.44 W 6004468.78 N 562965.55 E 0.912 4835.34 -
7189.84 70.440 328.580 3723.82 3790.42 4630.53 N 2709.57 W 6004542.10 N 562920.76 E 1.574 4914.28
7286.43 69.820 330.880 3756.65 3823.25 4708.97 N 2755.36 W 6004620.74 N 562874.28 E 2.330 4997.52
7379.75 70.520 332.310 3788.31 3854.91 4786.19 N 2797.12W 6004697.59 N 562831.85 E 1.625 5079.07
7482.64 72.030 333.540 3821.34 3887.94 4872.95 N 2841.46 W 6004783.96 N 562786.74 E 1.854 5170.40
7575.89 71.010 335.480 3850.90 3917.50 4952.78 N 2879.53W 6004863.45 N 562747.98 E 2.256 5254.11
7668.53 70.580 338.370 3881.38 3947.98 5033.25 N 2913.81W 6004943.61 N 562712.99 E 2.982 5338.03
7762.44 70.740 336.460 3912.48 3979.08 5115.06 N 2947.84W 6005025.12 N 562678.24 E 1.927 5423.24
7855.75 69.390 335.920 3944.30 4010.90 5195.31 N 2983.25 W 6005105.06 N 562642.12 E 1.546 5507.07
7949.49 68.540 334.590 3977.94 4044.54 5274.77 N 3019.81W 6005184.19 N 562604.81 E 1.605 5590.24
8043.49 67.640 335.280 4013.02 4079.62 5353.76 N 3056.82 W 6005262.86 N 562567.17 E 1.175 5673.00
8137.17 69.920 335.450 4046.93 4113.53 5433.14 N 3093.22 W 6005341.91 N 562530.07 E 2.440 5756.07
8230.07 78.470 336.760 4072.21 4138.81 5514.80 N 3129.31W 6005423.25 N 562493.20 E 9.303 5841.38
8276.37 82.100 336.480 4080.02 4146.62 5556.68 N 3141.48W 6005464.97 N 562474.73 E 7.863 5885.08
8324.00 87,050 336.020 4084.52 4151.12 5600.07 N 3166.57 W 6005508.19 N 562455.25 E 10.437 5930.40
8417.78 88.090 334.700 4088.50 4155.10 5685.23 N 3205.63 W 6005593.00 N 562415.45 E 1.791 6019.52
8510.71 88.210 336.000 4091.50 4158.10 5769.64 N 3244.37 W 6005677.07 N 562375.97 E 1 .404 6107.87
8604.82 87.290 336.510 4095.19 4161.79 5855.72 N 3282.23 W 6005762.81 N 562337.35 E 1.118 6197.77 ~
8698.90 86.120 336.780 4100.60 4167.20 5941.95 N 3319.47 W 6005848.71 N 562299.36 E 1.276 6287.74
8792.09 87.350 336.900 4105.91 4172.51 6027.48 N 3356.06 W 6005933.92 N 562262.01 E 1.326 6376.96
8884.77 87.780 340.050 4109.84 4176.44 6113.61 N 3390.03 W 6006019.75 N 562227.29 E 3.427 6466.45
8077.35 88.650 342.230 4112.73 4179.33 6201.17 N 3419.94W 6006107.04 N 562196.61 E 2.534 6556.90
9070.85 88.460 345.970 4115.09 4181.69 6291.05 N 3445.54 W 6006196.69 N 562170.22 E 4.004 6649.14
9164.83 87.290 345.960 4118.57 4185.17 6382.16 N 3468.32 W 6006287.60 N 562146.64 E 1.245 6742.28
9184.60 87.350 346.720 4119.50 4186.10 6401.35 N 3472.98 W 6006306.75 N 5a?141.81 E 3.852 6761.89
9261 .40 86,930 351.010 4123.33 4189.93 6476.59 N 3487.79W 6006381.86 N 562126.34 E 5.606 6838.34
9:H 1 .27 85,690 350.010 4126.54 4193.14 6525.68 N 3495.99 W 6006430.87 N 562117.70 E 3.192 6888, 04
9355.40 86.500 354.340 4129.55 4196.15 6569.28 N 3501.99 W 6006474.42 N 562111.33 E 9.960 6932,05
9402.05 89.080 358.440 4131.35 4197.95 6615.79 N 3504.92 W 6006520.90 N 562107.99 E 10,378 6978,59
9448.07 90.490 2,380 4131,52 4198.12 6661.80 N 3504.59 W 6006566.91 N 562107.91 E 9.093 7024.24
-----_._~---_._-.--_.~._-~. ._----_..__._---~- --~--------_._---~_._--~ _..._~-.-.- --- - ~ -~.-----_.~~-
28 October, 2002. 15:25 Page 4 0'8 Dri/lQlIest 3.03.02.002
Sperry-SunDri Sswices
Survey Report for MIlne P, " .;"",S.29MWD
Your Ref: API 1'f1ttlO
Job No. AKMW22160, SU~! 9 Oefober, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local CoordinatèS Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
9499.02 91.290 6.280 4130.73 4197.33 6712.59 N 3500.74W 6006617.73 N 562111.31E 7.813 7074.24
9541.95 90.550 10.590 4130.04 4196.64 6755.04 N 3494.45W 6008660.23 N 562117.23 E 10.185 7115.67
9591.82 89.750 17.070 4129.91 4196.51 6803.44 N 3482.54W 6006708.73 N 562128.72 E 13.092 7162.35
9634.77 88.950 22.830 4130.39 4196.99 6843.79 N 3467.89W 6006749.21 N 562143.01 E 13.539 7200.73
9687.74 90.000 29.490 4130.88 4197.48 6891.30 N 3444.55 W 6006796.93 N 562165.93 E 12.728 7245.21
~
9728.88 90.620 35.140 4130.66 4197.26 6926.06 N , 3422.57 W 6006831.88 N 562187.61 E 13.816 7277.17
9780.92 90.120 41.560 4130.32 4196.92 6966.85 N 3390.29W 6006872.95 N 562219.52 E 12.374 7313.92
9823.06 89.750 46.440 4130.37 4196.97 6997.15 N 3361.03 W 6006903.51 N 562248.52 E 11.614 7340.62
9869.66 90.250 52.420 4130.37 4196.97 7027.44 N 3325.65 W 6006934.11 N 562283.63 E 12.877 7366.59
9915.20 89.260 56.010 4130.56 4197.16 7054.07 N 3288.71 W 6006961.06 N 562320.33 E 8.177 7388.74
9963.46 88.220 54.910 4131.62 4198.22 7081.42 N 3248.97 W 6006988.76 N 562359.83 E 3.136 7411.28
10010.13 86.000 55.650 4133.98 4200.58 7107.97 N 3210.66 W 6007015.65 N 562397.90 E 5.013 7433.19
10058.74 85.690 55.840 4137.50 4204.10 7135.26 N 3170.59W 6007043.29 N 562437.74 E 0.747 7455.64
10103,55 85,630 55.480 4140.89 4207.49 7160.46 N 3133.70 W 6007068.81 N 562474.41 E 0.812 7476.38
10152.40 86.490 54.190 4144.25 4210.85 7188.53 N 3093.86 W 6007097.23 N 562514.00 E 3.169 7499.62
10197.03 86.430 53.920 4147.00 4213.60 7214.68 N 3057.79 W 6007123.70 N 562549.83 E 0.619 7521.40
10245.35 86.980 53.600 4149.78 4216.38 7243.20 N 3018.89 W 6007152.55 N 562588.48 E 1.316 7545.20
10290.30 85.200 53.240 4152.85 4219.45 7269.92 N 2982.88 W 6007179.59 N 562624.26 E 4.040 7567.55
10338.83 85.310 53.250 4156.86 4223.46 7298.86 N 2944.13 W 6007208.87 N 562662.75 E 0.228 7591.79
10383.76 85.620 52.470 4160.41 4227.01 7325.90 N 2908.42 W 6007236.23 N 562698.22 E 1.863 7614.49
10433.21 85.260 52.340 4164.34 4230.94 7355.98 N 2869.37 W 6007266.64 N 562737.01 E 0.774 7639.82
10477.18 85,190 52.420 4168.00 4234.60 7382.72 N 2834.66 W 6007293.70 N 562771.48 E 0.241 7662.34
10527.31 85,000 51.980 4172.29 4238.89 7413.34 N 2795.19 W 6007324.65 N 562810.67 E 0.953 7688,16 --,
10571.44 84.710 52.080 4176.25 4242.85 7440.38 N 2760.54 W 6007352.00 N 562845.08 E 0.695 7710.99
10620,87 86.430 50.050 4180.07 4246.67 7471.35 N 2722.21 W 6007383.30 N 562883.14 E 5.373 7737.29
10663,72 86.490 49.380 4182,71 4249.31 7499.00 N 2689.59 W 6007411.24 N 562915.52 E 1.567 7760.96
10714.38 88.340 48.050 4185.00 4251.60 7532.39 N 2651.56 W 6007444.97 N 562953.25 E 4.496 7789.70
10757.01 87.300 46.950 4186.62 4253.22 7561.17 N 2620.16W 6007474.02 N 562984.40 E 3.550 7814.63
10807.65 87,660 46.820 4188.84 4255.44 7595.75 N 2583.23 W 6007508.92 N 563021.03 E 0.756 7844.67
1 0851 . 1 7 88.220 47.650 4190.41 4257.01 7625.28 N 2551.30 W 6007538.73 N 563.052.70 E 2.300 7870.29
10899.60 88.710 47.900 4191.71 4258.31 7657.81 N 2515.45 W 6007571.58 N 563088.26 E 1.136 7898.43
10944.30 85.200 47.770 4194.08 4260.68 7687.77 N 2482.37 W 6007601.83 N 563121.07 E 7.858 7924,34
10994.26 87.660 47.790 4197.19 4263.79 7721.27 N 2445.44 W 6007635.65 N 563157.70 E 4.924 7953.32
11037,88 87.540 47.410 4199.02 4265.62 7750.66 N 2413.26 W 6007665.32 N 563189.63 E 0.913 7978,77
11086.40 88,950 47.440 4200.50 4267.10 7783.47 N 2377.55 W 6007698.45 N 563225.05 E 2.907 8007.20
------~...._-_.__.+_.,_._.-._.+-_.-._-----~----- --~--.........--..,....---~--~._------_.. ---. '_U_~--'--~'------_._-
28 October, 2002 - 15:25 Page 50f8 Dri/lQuest 3.03.02.002
Sperry-Sun "DI'(I.(Jilervices
Survey Report for MIlne POIiJtiffs ..IIPS..29MWD
Your Re':API~11900
Job No. AKMW22180,SutYtltf/:9 OCfOber, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordl"".. Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northll1gs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11130.91 89.320 48.180 4201.18 4267.78 7813.36 N 2344.57W 6007728.62 N 563257.76 E 1.859 8033.05
11179.80 90.310 46.980 4201.33 4267.93 7846.34 N 2308.48W 6001761.92 N 563293.56 E 3.182 8061.60
11225.11 90.490 47.380 4201.02 4267.62 7877.14 N 2275.25W 6001193.01 N 563326.52 E 0.968 8088.33
11274.24 89.940 46.170 4200.83 4267.43 7910.78 N 2239.45W 6001826.97 N 563362.02 E 2.705 8117.58
11317.50 90.990 48.160 4200.48 4267.08 7940.19 N 2207.73W 6007856.65 N 563393.48 E 5.201 8143.10
'~
11365.23 86.620 46.280 4201.48 4268.08 7972.59 N , 2172.71 W 6007889.36 N 563428.21 E 9.966 8171.21
11410.77 84.520 46.130 4204.99 4271.59 8004.01 N 2139.94W 6001921.01 N 563460.70 E 4.623 8198.60
11459.91 83.770 45.940 4210.01 4276.61 8037.95 N 2104.76W 6001955.31 N 563495.59 E 1.574 8228.22
11504.14 85.940 44.960 4213.97 4280.57 8068.85 N 2013.31W 6007986.49 N 563526.71 E 5.380 8255.26
11555.35 88.520 45.070 4216.45 4283.05 8105.01 N 2031.19W 6008022.96 N 563562.56 E 5.043 8286.96
11597.85 88.950 45.510 4217.39 4283.99 8134.90 N 2007.00W 6008053.12 N 563592.49 E 1.447 8313.14
11647.80 88.400 45.090 4218.54 4285.14 8170.02 N 1911.50W 6008088.55 N 563627.68 E 1.385 8343.89
11690.63 86.500 44.090 4220.45 4287.05 8200.49 N 1941.41W 6008119.29 N 563657.45 E 5.012 8370.66
11745.20 86.430 43.180 4223.81 4290.41 8239.91 N 1903.88W 6008159.03 N 563694.68 E 1.669 8405.44
11784.63 84.580 44.040 4226.90 4293.50 8268.37 N 1876.17 W 6008181.73 N 563721.54 E 5.171 8430.55
11832.66 87.470 44.080 4230.23 4296.83 8302.80 N 1843.45 W 6008222.45 N 563754.55 E 6.018 8460.87
11877.77 86.980 43.660 4232.41 4299.01 8335.28 N 1812.23iW 6008255.21 N 563785.49 E 1.430 8489.50
11925.85 87.110 43.510 4234.89 4301.49 8370.06 N 1119.12W 6008290.28 N 563818.29 E 0.413 8520.20
11970.82 86.990 43.060 4237.21 4303.81 8402.76 N 1748.33W 6008323.24 N 563848.79 E 1.034 8549.09
12018.25 86.430 42.100 4239.93 4306.53 8437.62 N 1716.29W 6008358.39 N 563880.52 E 2.340 8579.99
12064.63 88.340 42.860 4242.05 4308.65 8471.79 N 1685.01, W 6008392.83 N 563911.51 E 4.432 8610.28
12117.97 88.520 42.300 4243.51 4310.11 8511.05 N 1648.93W 6008432.40 N 563947.24 E 1.102 8645.08
12157.36 88.950 43.910 4244.38 4310.98 8539.80 N 1622.02 W 6008461.39 N 563973.90 E 4.230 8670.51 --
12205.88 89.140 45.130 4245.19 4311.79 8574.39 N 1588.00W 6008496.28 N 564007.61 E 2.544 8700.91
12251.13 89.080 43.690 4245.89 4312.49 8606.71 N 1556.34 W 6008528.87 N 564038.98 E 3.185 8729.32
..
12297.90 89.080 42.010 4246.64 4313.24 8640.99 N 1524.54 W 6008563.44 N 564070.48 E 3.592 8759.67
12332.69 89.080 41.490 4247.20 4313.80 8666.95 N 1501.38W 6008589.59 N 564093.41 E 1 .494 8782.76
12391.26 91.230 43.110 4247.04 4313.64 8710.26 N 1461.96 W 6008633.25 N 564132.45 E 4.596 8821 .19
12436.12 90.000 41.800 4246.56 4313.16 8743.36 N 1431.69W 6008666.61 N 564162.43 E 4.006 8850.54
12488.20 91.050 41.920 4246.08 4312.68 8782.14 N 1396.93 W 6008705.70 N 564196.84 E 2.029 8885.02
12529.41 90.860 41.730 4245.39 4311.99 8812.85 N 1369.46W 6008736.65 N 564224.05 E 0.652 8912.32
12580.32 90.740 40.530 4244.68 4311.28 8851.19 N 1335.97 W 6008775.28 N 564257.19 E 2.369 8946.51
12625.50 90.920 41.330 4244.03 4310.63 8885.32 N 1306.38W 6008809.67 N 564286.49 E 1,815 8976.96
12675.30 89.690 41.480 4243.76 4310.36 8922.67 N 1273.44 W 6008847.31 N 564319.09 E 2.488 9010.23
12718.07 88.280 39.410 4244.52 4311.12 8955.21 N 1245.10 W 6008880.09 N 564346.54 E 5.855 9039.32
--------..~-~----_._-------------- _._--~------,._._.--,,-----...~_....---~.._. ._--,-~.->--_.--_._~---_._--
28 October, 2002 - 15:25 Page 6 0'8 DrillQlIest 3.03.02.002
Sperry-SunDrl './:f1(~erttices
Survey Report for Milne" ,'- ,.>- S .ÌlPS~29IfWD
Your Ref:AP/~119ØO
Job No. AKMW22160, Survtyed:9 October, 2002
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
12767.66 87.910 38.750 4246.17 4312.77
12811.49 88.150 38.160 4247.68 4314.28
12861.12 89.450 39.000 4248.72 4315.32
12881.61 91.540 39.450 4248.54 4315.14
12950.00 91.540 39.450 4246.70 4313.30
Local Coordinates
Northings Eâ$tings
(ft) (ft)
8993.69 N
9027.99 N
9066.78 N
9082.65 N
9135.44 N
1214.46W
1187.22W
1156.28W
1143.32 W
1099.88 W
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 353.320° (True).
Magnetic Declination at Surface is 25.734°(29.Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.000.,
The Bottom Hole Displacement is 9201.41ft., in the Direction of 353.135° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
12950.00
4313.30
9135.44 N
1099.88 W
Projected Survey
28 October, 2002 - 15:25
Page 70f8
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
6008918.84 N
6008953.38 N
6008992.44 N
6009008.42 N
6009061.59 N
564377.45 E
564404.39 E
564434.99 E
564447.80 E
564490.78 E
BPXA
Dogleg
Rate
(0/100ft)
Vertical
Section
Comment
1.525 9073.90
1.452 9104.80
3.118 9139.73
10.434 9153.98
0.000 9201.36 Projected Survey
-'
---------"-""--'~---'~.-~'------'"-"'-----'---
DrillQuest 3.03.02.002
Sperry-Sun}!~t}jj;, ,,', IKtlces
Survey Report for MIlne: ' '~'.S.29 MwD
Your Ref:APr~11Øl1
Job No. AKMW22160, suMiytd: 9 OCtober, 2002
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Survey too/ørogram for MPS-29 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Déscription
0.00
178.00
0.00 178.00
178.00 12950.00
178.00 AK-1 BP _HG '
4313.30 MWD Magnetic
'~'
~
--_.._~....-.-------------
---_..._-----~- ---~""-"'+~'---'-~-'----'-- _.~->_._.".~-----
28 October, 2002 - 15:25
Page 8 of8
DrilfQuest 3.03.02.002
MPS-29 Cement Job
)
J
Subject: MPS-29 Cement Job ~,<!) 2,.., ~, I'iS
Date: Wed, 9 Oct 2002 17:17:34 -0500
From: "Green, Matt D" <GreenMD@BP.com>
To: "Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us>
Winton,
Just a note to inform you of the cement job on MPS-29.
7.625-in casing was run to 9,237-ft. After cleaning the annulus, 10-bbl
water, 50-bbl Alpha spacer, then the 10.7-lb/gal Permafrost L lead cement
was pumped. After 1,150-bbl, we started to see the red dye in the spacer at
surface. At 1,300-bbl we lost returns and pumped and additional 51-bbl of
lead cement before pumping 123-bbl 15.8-lb/gal Premium tail cement. A top
job was then performed. 1.0-in tubing was run to 115-ft, that is just below
the base of the conductor, and could not be run further. The tubing was
picked up and green cement was plugging the tubing. The tubing was then run
to 110-ft and 34-bbl lead cement was pumped with 3-bbl return to surface.
We are therefore confident of a good intermediate casing cement job to
surface.
Please call if you have any further questions,
Cheers,
Matt
Matthew D Green
Drilling Engineer
BP Exploration Alaska,
PO Box 196612
Anchorage AK 99519-6612
(W) +1 (907) 564 5581
(M) +1 (907) 529 8501
(F) +1 (907) 564 4441
MB 4-1
~
v
')
I
AI1ASIiA OIL AM) GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
P at Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Milne Point Unit MPS-29
BP Exploration (Alaska), Inc.
Permit No: 202-195
Surface Location: 3270' NSL, 340' WEL, Sec. 12, T12N, R10E, UM
Bottomhole Location: 1899' NSL, 1419' WÈL, Sec. 35, T13N, R10E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
~
Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DATED this.1.b.- ~ay of Sep'tember, 2002
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
Hole
42"
9-7/8"
6-1/8"
" STATE OF ALASKA"\
ALASKA¡",Æ. AND GAS CONSERVATION COMMlvSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well IJ Exploratory IJ Stratigraphic Test II Development Oil
IJ Service IJ Development Gas IJ Single Zone IJ Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned KBE= 68' Milne Point Unit / Schrader
6. Property Designation Bluff
ADL 025518
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPS-29 Number 2S100302630-277
9. Approximate spud date~
~~~~:~o~::~~n !lerty 15. ;::~:~::~~~Oand TVD)
2560 13023' MD / 4331' TVD
0 17. Anticipated pressure {sye 20 AAC 25.035 (e) (2)}
94 Maximum surface 1692 psig, At total depth (TVD) 4181'/1880 psig
Setting Depth
T QO Botom Quantity of Cement
MD TVD MD TVD (include staae data) /
Surface Surface 112' 11æ. 2ß&¡sx Arctic SJ*"fApprox.)
Surface ,~url~- 9389' .(41fW~~ PF 'L'~54o-ix Class 'G' /
9289' r:~ 13023' 4331 ncementefLSlétted Liner
il-r'llfr;o ~ I' ~A-
v..t<;A-
lJ.t~A-. 1/lS/0 "l-
~.. /(-4~
1 a. Type of work II Drill IJ Redrill
IJ Re-Entry IJ Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4568' NSL, 3870' WEL, SEC. 01, T12N, R10E, UM (OB)
At total depth
1899' NSL, 1419' WEL, SEC. 35, T13N, R10E, UM (OB)
12. Distance to nearest property line 13. Distance to nearest well /
ADL 380109,1899' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 433' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couolina
20" 92# H-40 Welded
7-5/8" 29.7# L-80 BTC
4-1/2" 12.7# L-80 BTC
11. Type Bond (See 20 AAC 25.025)
Lenath
80'
9389'
3734'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
r, ..
~~
.t!W'f!
F
Perforation depth: measured
true vertical
20. Attachments
II Filing Fee IJ Property Plat IJ BOP Sketch IJ Diverter Sketch II Drilling Program
II Drilling Fluid Program IJ Time vs Depth Plot IJ Refraction Analysis IJ Seabed Report IJ 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Sandra Stewman, 564-4750
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Pat Archey. P ;<~{~~;;ii#:d¡i',¡;;~~~~~:~~.;~ß~...",.8;;.~::~;:.(.~é;( OJ.
Permit Number API Number ' , Ap~oval Dct~ f) See cover letter
202.- /7>5" 50- 02. 7'- 2.:5 / / 7 l1'J\ll U 0"\ for other requirements
Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Réc.uired 0 Yes ß No
Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required C8I Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: -reS t- ßo () E- fo 4-0(90 P u. .
ORIGiNAL SIGNED BY
0 Tavlor Seamount "Cp-rn~iS~iOl'Jer
f r ¡
~,l \
Approved B~
Form 10-401 Rev. 12-01-85
by order of
the commission
Date q 9)/ C ()'Ä
SutYnit 1;;1- ¡plicate
~ ,
Milne ~,\,t MPS-29 Well Permit
)
IWell Name: I MPS-29 /
Drill and Complete Plan Summary
I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "08"
20091 FNL, (32701 FSL), 340' FEL, (49391 FWL), SEC. 12, T12N, R10E
E=565670.94 N=5999936.18
7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E
E=562082 N=6006484 Z=4161' TVD
33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 Z=4271' TVD
7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E
E=562082 N=6006484 Z=4189' TVD
33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 Z=4250'TVD
33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 Z=4331' TVD
1 AFE Number: 1 I Ria: 1 Doyon 141 / 1
1 Estimated Start Date: 1 SEP 29,2002 1 I Operatina days to complete: 113 1
1 MD: 113023 1 1 TVD: 14331 1 1 Max Inc: 194 1 KOP: 1'433 1 1 KBE: 168 1
1
1
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "08"
Target Location:
BHL "08" Well TD
TOTAL DEPTH
I Well Desian (conventional, slim hole, etc.): 1 Conventional Grass.Roots ML Producer
r Objective: I Schrader 08 Sand
Mud Program:
9-7/8" Surface Hole Mud Properties:
Density (ppg) Funnel visc YP
8.6 - 9.20 / 75 - 150 25 - 60
Spud - LSND Freshwater Mud
pH API Filtrate LG
Solids
< 6.5
HTHP
N/A
9.0-9.5
<8
6-1/8" Production Hole Mud Properties: KCL-CaC03 Flow Pro
Density (ppg) Funnel visc YP HTHP pH API Filtrate LG
, Solids
8.6 - 9.20 / 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D5-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
1
')
Milne Pr" ) MPS-29 Well Permit
Cement Program:
Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing
B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
aSlS
permafrost
Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location.
Total Cement Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
Spacer 50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50
ppg /
Lead 45 sx }0.7Ib/gal Class L - 4.15 cuft/sx (cement to surface)
Tail 1540-~x 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 3496'
Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton
Evaluation Program:
9 7/8" Hole Section:
Open Hole:
Cased Hole:
6-1/8" Hole section:
Open H91e:
MWD/GRlRES IFRlCASANDRA
N/a
MWD/GRlRES ABI/IFRlCASANDRA
Formation Markers:
Formation Tops MDrkb TVDßb . Estimated EMW
(ft) (ft) Pore Pressure (pSI) (lb/gal)*
Base Permafrost 1,812 1,706 767 8.65
Top Ugnu 3512 1579 8.65
TopUgnuM NA
Bottom U gnu NA
NA NA 3969 1785 8.65
NB NA 3996 1797 8.65
NC NA 4026 1810 8.65
NE NA 4043 1818 8.65
NF NA 4091 1840 8.65 '\,\.-
Top OA NA 4122 1854 8.65
Base OA NA 4147 1865 8.65
Top OB NA 4181 1880 8.65
TD 13023 4312 1939 8.65
2
. '~)
Casing/Tubing Program:
Milne pr')MPS-29 Well Permit
Hole Csg I
Size Tbg O.D.
42-in 20-in* 92#
9.875-in 7.625-in 29.7#
6.125-in 4.5-in 12.7#
6.125-in 4.5-in 12.7#
*The 20" casing is insulated
Wt/Ft Grade Conn Length Top
/ MD/TVDdb
H-40 Welded 80-ft 0
L-80 I BTC 9389- ft 0- ft
L-80 BTC-932t1..ft 9100-ft /4,208-ft
L-80 BTC /3,734-ft 9289-ft /4,227-ft
l) 3<>¡aLJ' ,
Bottom
MD I TVDrkb
112-ft / 112-ft
9389-ft / 4191-ft
13024-ft / 4271-ft
13023-ft / 4,331-ft
?
I
Recommended Bit Program:
BHA
1
2
3
Hole
Size
9.875-in
9.875-in
6. 125-in
Depth (MD)
Bit Type
Nozzle/Flow
rate
3-15 & 1-10
TBD
3 -12
0 - 2,000-ft
2,000 - 9389-ft
9100-ft - TD
Hughes MXC-1
TBD
Security FM2643
Well Control:
. Production hole will be drilled with a diverter. /
Surface Interval
. Maximum anticipated BHP:
. Maximum surface pressure:
1880 psi @ 4181' TVDrkb - Top of "OB"
1692 psi @ su rface ./
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
Diverter will be function tested. BOP's:Test annular 250 psi low/
and 2500 psi high, and rams to 250 psi low and 4,000 psi high.
N/A
9.2 ppg NaCI / 6.8 ppg Diesel
. Planned BOP test pressure:
.
. Kick tolerance:
. Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
. Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
3
:)
Milne pr oJ MPS-29 Well Permit
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
. Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
. It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud. /
Pad Data Sheet
.
Please Read the S-Pad Data Sheet thoroughly.
Breathing
. N/A
Hydrocarbons
. Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
. NA
Hydrogen Sulfide I
. MPS Pad is not designated as an H2S Pad. /
Anti-collision Issues
. MPS-29 has no anti-collision issues.
4
I')
DRILL & COMPLETION PROCEDURE
Milne pr.')MPS-29 Well Permit
Pre- Rig Operations
1. The 20" insulated conductor is installed
Procedure
/
1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe
2. Drill 9-7/8" surface hole as per directional plan.
3. Condition mud prior to 7 5/8" casing run. POOH /
4. Run and cement 7 5/8" casing from TD to surface.
5. ND Diverter
6. Install FMC 11" 5m horizontal wellhead
7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250
low and 4000 psi high /'
8. Drill 6-1/8" OB horizontal production hole as per directional plan.
9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. ---
10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at top of the OA interval.
b. Shear off and mill window thru 7-5/8" casing.
11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
12. MU whipstock retrieving tool and pull whipstock
13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing /'
14. POOH
15. Till and displace out drilling mud with 9.2 ppg NaCI
16. POOH
17. Run in hole with 4-1/2" jet pump completion as per schematic /
18. Land tubing hanger and test
19. Set BPV
20. ND BOP
21. Install and test tree
22. Pull BPV
23. Drop ball and set production packer
24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi /
25. Freeze protect thru GLM
26. Install BPV and secure the well
27. RD/MO
5
~ ~
~<::::: .~ 9-7/8"Hole
. "
\ ~'- -----
'-- '-- -- OB Horizontal 6-1/8" hole
-------
112'
9.2 KGI with corrosion
inhibitor as packer fluid
Jet Pump Installed in
Sliding Sleeve Post rig!
III
.¡" ..,
, ,
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing ID: 6.875
Coupling 00: 8.5"
Burst: 6,890 psi
Collapse: 4,790 psi
Window in 7" casing @ 9,100' MD
Well Inclination @ Window = 87 Degrees
7.625" Casing Shoe @ 9,389' MD
Well Inclination @ Shoe = 90 Degrees
PBTD
TD
DATE
130 Sep 02
COMMENTS
Level 3 Multi-Lateral, 4-112" Jet Pump Completion
REV. BY
SKC
KB. ELEV =66.5'
Cellar Box ELEV = 38.0'
... 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD,
RP shear valve open position
4-1/2",12.6 Iblft, L-80, IBT-M
Coupling 00: 5.2"
Drift/lD: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
"BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down
to lower sensor)
./
Halliburtion Oura Sleeve XO WIX Nipple (3.813" 10)
Phoenix Pressure Gauge (2.840" ID)
.....-.-
I Set @ 8,950' MD, 4150' TVD I
7-5/8" x 4-1/2" S-3 Packer
3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod
Wireline Entry Guide
\~
.......
Multi-Lateral Junction 9,100'
6-1/8" OA Lateral TO 13,024'
6-1/8" OB Lateral TO 13,023'
~-
- -
- -
- -
OA Horizontal 6-1/8" hole
r-- -- - -
- -
- -
- -
4-1/2" Slotted Liner W/Hookwall hanger
- -
- -
4-1/2" Slotted Liner & Hanger
I) 01..-)
Milne Point Unit
WFI I : MPS-?9
API NO:
~'4 -Y-8U1 BPXA
v,,~n 1811ti..,.,:Y'Lø Milne Point Unit
~~~ìD...1IV
Proposal Data for MPS-29 6.0
~~~~t~æ~~\n :
Measurement Un~s :
North Reference :
Well
Well
ft
True North
=1 =~ ~roolh: ~3~per 100 feet (US)
Venical Section Desc""tion: Well
Vertical Section Origin: 0,00 N,O,oo E
M...ured IncL Azlm. Vertical Horthlngs Elating. V.rtlcal DogI.g
Deplh Depth Secllon Rat.
0,00 0,000 O,SQ4 0,00 '''.IN O,OOE 0,00
300,00 0,000 0,504 300.00 "'.IN O,OOE 0,00 0,000
433,33 2,000 326,000 433.30 I .~ ~ N \.3OW 207 \.500
1451.52 30,000 326,000 1402,34 -' 'IN 156,68 W 248.94 2,750
1908,66 38,000 326,000 178\.02 ......i)N 299.51 W 475,87 \.750
2036,81 38,000 326,000 1882,00 ":,,'..aiN 343,63 W 545,97 0.000
2859,24 70,680 330.850 2355,16 /I- . "~N 683.62 W 1146.08 4.000
8061.36 70,680 330,850 4076,25 ~ '..1 _i N 3074,86W 568254 0.000
8061.97 70.680 330,850 4076,46 -!P.I :iN 3075,14 W 5683.07 0,000
8488,71 87,650 332,735 4156.39 "".-IN 3272.34W 6071.60 4,000
8707,16 87,650 332,735 4165.35 a.~:. II~ N 3372.33 W 6275,93 0,000
9388,33 88,000 0,000 419\.70 r:. J. IlN 353\.23 W 6945,23 4,000
9805,78 88,795 50,109 4204,18 ",'.,I".11N 3360,07 W 7288.88 12000
10049.79 88.795 50,109 4209.31 '1111 r.lN 3172.90 W 742250 0.000
10114,95 87,000 52,000 4211,70 =1-1. "'oII)N 3122,26 W 7457,26 4,000
10188.32 85.432 54,487 4216.54 ",..,.. .."5N 3063,61 W 7493,95 4,000
10554.43 85.432 54,487 4245,70 ""II ..,N 2766.55 W 7669,95 0,000
10720,92 87,000 48,000 4256,70 ',,"' "IN 2637,08 W 7758,13 4,000
10756,05 87,554 46,707 4258.37 ",.,,,7N 261\.27 W 7778,74 4,000
11262.53 87,554 46,707 4279,98 ,,,:",.;N 2242,96 W 8080.53 0,000
11306.37 87,960 45.000 428\.70 ,... 7 N 221L53 W 8107,17 4,000
11320,20 87,961 44,447 4282,19 '-'I' '-)N 2201.81 W 8115,79 4,000
11904.84 87,961 44,447 4302,99 !""'"')N 1792,67 W 848248 0,000
12027,00 88,562 39,595 4306,70 "-1 I ')N 1710,96 W 8563,05 4,000
13023.26 88,562 39.595 4331.70 '!C" ,,~ N 1076,19 W 9251.45 0,000
0 ~In Dlr 0 1.500'/1ooft: 300.00ft MD. 300,00ft lVD
Ifr Rate Increase 0 2,750'/1ooft: 433,33ftMD,433.30ftlVD
700.00
1250 -
ecrease In Dlr Rate 0 1.750'/100ft: 1451 ,52ft MD, 1402,34ft lVD
14.ðO,00
ã>
~
.c
ã.
Q)
0
~ 2500 -
t
Q)
>
nd Dlr, Start Sail @ 38.000': 1908,66ftMD.1781.02ftTVD
gin Dlr 0 4.0oo'/1ooft: 2036.81ft MD, 1882.ooftlVD
ã>
~ 5000 -
en
C)
c::
:ë
1:::
0
Z
=:
0
0
I()
C\I
II
.c
0
.£
Qj
¡Erd Dlr, Start Sail 0 70,680': 2859.24ftMD,2355.16ftlVD ~
Z8f'OO en
3500.00
4200,00
Ë
I()
C\I
7, 3750 -
.c
0
.£
Qj
~
en
0
Scale: 1 inch = 1250ft
I
1250
I
2500
DriIlQuesI2,QO.09,008
4900,00
_5600,00
I
3750
Milne Point MPSDrillll"est'"
MPS-29 WP 7.0
I::astings (Well)
Scale: 1 inch = 25000
-2500
I
0
I
b
"?~
....~~
Z' E'IC) [''', .'a" ;,<"t oW ...,. ,,:": 12027,00IIMD,4306.7011lVD
t-r.':J. ~f\--III' lll. .¡J;..I{...I'I.í"ln 11904.84ftMO,4302.99ftTVD
$-'"' ,'. ::: -E :~-~'~,,:" ~',~~ '::",;,~r;:~~;" 'f1~~~~~,4282.19ftTVD
.".. "E"o'd'U ÚI, .. , '2' (, '''''.' "¿' 1.5311 MD, 4279.981t TVD
U""::.::'P r.s 4."M ¡II T\fLJ ?!~I ¡.~ ~ ::~11.53W
l~:n[~[",: ;nJ ;¡',:I, ~II~~-~I.-":II;_.~"';I~~ '~8~~~W~
...v ~~~I ~~'i ;.~~';'~~'.I T~;-.~:'-::" ,II t~rl:~~,~~~I~D,4245.7QftTVD
nd~~~ .f1::n~-~'lt~lt~I-~~~. I~:~~~ ~:~..~~f~;-:~"~':J~D
MPS.29'. ...:', ;,¡,r"J[' ;I~: : tJ _Lt..::-... "'-1
~rRatell"k.l~"'_=' G I"': 'It II' flt..n '.10.1),. -ljHMLJ..1191.7OftTVD
MPS-29T1
418 ,<r"173,194191 ,70 T\ID. 6579,12 N. 3531,23 W
--Begin Dlr @ 4.000'¡1ooft : 8707.16ft MD, 4165.3511 TVD
rd Dir, Start Sail @ 87.650' : 8488.71ftMD,4156.39ftlVD
~~!~~~~~~~rsD64~~\l;!¡!~~
7500 -
~
2500 -
n Dir 0 4.000'/1ooft : 8061.9711 MD, 4076.46ft TVD
MP8-29 Purrp T algel-
900.004076,46 T\ID. 5361,75 N. 3075,14 W
0-
Begin Dlr @ 4.000'/100II :2036.8111 MD, 1882,00II TVD
'00 Dlr, Start Sail 0 38.000': 1908,66ftMD,178L02ftTVD
crease in Dir Rate 0 1.750'/10011: 1451.52ft MD, 1402.3411 TVD
~~~I!r¡r~~~~1~~'~&it '\rr¡~8Ófffv:rrlVD
~<::)
~<::) ~<::) ~ "'~ .j.<::) ~ ~<::)
~~ ,g.~ ~ ~,. .¡¡:.-~ ~ -<;:\<::) ~<::)~<::) ~<::) ~~<::)
#'0' ,~. ~~ ~~" "",:-'0 'þ~ ""ro1- "'~ ~~ ~,~ ¡§> ~~
~' ~~ ...,~ rÇ>~ ~c6J ~~ ~~ ~'o' þ'b (\~~ rh"" ¡g,~ S)'o'
~~ ,~ ~' ¡¡,. ~<::)~, ~ ~~, -&' {P {:J {:J
,9> ¡¡,"f. ,~~ .';'JcgJ ~,!-'8<f"~-J<~ ~<::)~~~ ~~~' ~St~'
.,!,~ ,.'lfé' !;)~ .~'b~~'S ,~~ ~~~<lP' '9c§:- ~'Y <#'~~
r§> 9.P.'!' o\~ ~ . ,,(3' tf'. <§"."~ t{J>"',,~ #....~
\,,<;$ (I" ~ r§> ~r§J "'<¡¡"":'...":J'." I~' ,,"- ,'. ,,'" '.
r§J<!.@'b 0\,,<;$ ~. <{J>~,,~\)'~'~' rov~' ~t$- '.ro'o<f,
@).. <# ~';:P fb @ ~ ~<!.\ ~ @ !S~@ (} ~\~ .¡¡.. \"#'b'b'
Q> #~ ~@.... ,,~~ l~).'l'~",~ <#...~ <#0 ~~@
...~ ~,~ -s: ~~ ~ @ ~ 0 ~~ @).~
0<:$ ~ ~ ~0~, Q ~, Q> ~ ~ <¿,..:? ~ <¿,..:?
7700,00 j t~/,¡i "l~<é' t:.?b ~vi~ ($? b<1>~~ QQ>' ~ Q~, Total Depth:
84000 ¡~~~ ~~",b/J~_~b 13023,26ftMD,
- t' 9100,00 "Ð , 1n V v Ml'S-29L1WP3.0 4331.70ftTVD
. S T2 - . 1nn MIIIK-'O 8' MPS.29 T6
MPS.29 T1 ~ 70 T\ID ~..., ¿ ÞS-!!9 I r; . 4331,70 T\ID.
41111,70 T\ID. 71<12.5$N, 31u.æ W MPS-2IIT3 .. 4281,70T\ID, ~ MPS.29T5 11188,64 N, 1076,19 W
6579,12 N, 353123 W 4250.70 T\ID, 71103,57 N, 2211.53 W 4308,70 T\ID.
7~30 N2637,08 W /6421.111 N. 1710,116 W
6250 7500 8750 10000
Section Azimuth: 353.320° (True North)
,~
6300.00
]000.00
MPS-29 PuIr9 Target-
4076.46 TVD,
5361.75 N, 3075.14 W
I
5000
Vertical Section (Well)
BP EXPLORA TION
int Unit
A
n MPS, Slot MPS-29
MPS-29 6.0
Revised: 11 September, 2002
PROPOSAL REPORT
11 September, 2002
Surface Coordinates: 5999936.18 N, 565670.94 E (70024' 36.9759" N, 149027' 54.9398" W)
Surface Coordinates relative to Project H Reference: 999936.18 N, 65670.94 E (Grid)
Surface Coordinates relative to Structure: 32.89 S, 674.38 W (True)
Kelly Bushing: 66. 70ft above Mean Sea Level
- .. .y.......,
aJ!Iq;.-';J!I1I::'::=:.~~'lÇ;'.J.I
"'!~~,Qi#.~
~
,~ß
Proposal Ref: pro10181
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured
Depth
(ft)
0.00
300.00
400.00
433.33
500.00
Incl.
Azim.
0.000
0.000
0.000
0.000
1 .500 326.000
2.000 326.000
3.833 326.000
600.00 6.583 326.000
700.00 9.333 326.000
800.00 12.083 326.000
900.00 14.833 326.000
1000.00 17.583 326.000
1100.00 20.333
1200.00 23.083
1300.00 25.833
1400.00 28.583
1451 .52 30.000
1500.00
1600.00
1700.00
1800.00
1900.00
Sub-Sea
Depth
(ft)
-66.70
233.30
333.29
366.60
433.18
532.76
631 .79
730.04
827.28
923.30
1908.66 38.000 326.000
2000.00 38.000 326.000
2036.81 38.000 326.000
2100.00 40.502 326.572
2200.00 44.466 327.366
11 September, 2002 - 13:27
1377.44
1462.50
1545.91
1627.60
1707.49
1714.32
1786.30
1815.30
1864.23
1937.96
Sperry-Sun Drilling Services
Proposal Report for MPS-29 6.0
Revised: 11 September, 2002
Vertical
Depth
(ft)
0.00
300.00
399.99
433.30
499.88
599.46
698.49
796.74 ,~~~;~*:",-
893.98è;/ - :~- ;,.
,: t~pO:'M;,~;/~':»
..
Y08~~56,
, ->1171,4$:,'. ~,
- 126~t4'8
1357.41
1402.34
1444.14
1529.20
1612.61
1694.30
1774.19
1781.02
1853.00
1882.00
1930.93
2004.66
Local Coordinates
Northin9s Eastin9s
(ft) (ft)
O.OON
O.OON
1.09N
1.93 N
Global Coordina
Northin9s
(ft)
O.OOE
0.00 E
0.73 W i~9993'l.26N
599993$; 10 N
5999~;8;~
~~"936.18"'
,'''- 108.51 N
139.17 N
173.49 N
211.39 N
232.29 N
252.64 N
296.23 N
341.96 N
389.77 N
439.63 N
444.05 N
490.67 N
509.45 N
542.71 N
599.33 N
73.19 W
93.87 W
117.02 W
142.59 W
156.68 W
170.41 W
199.81 W
230.65 W
262.90 W
296.54 W
299.51 W
330.96 W
343.63 W
365.82 W
402.61 W
Page2of9
-~1&>
5999940.89 N
5999948.37 N
5999959.78 N
5999975.09 N
5999994.27 N
6000017.27 N
6000044.04 N
6000074.52 N
6000108.64 N
6000146.31 N
6000167.08 N
6000187.32 N
6000230.65 N
6000276.10 N
6000323.63 N
6000373.19 N
6000377.57 N
6000423.92 N
6000442.59 N
6000475.65 N
6000531.95 N
-:(~l'1'~
BPXA
Milne Point MPS
~!};:.;;;D'Oø!ê9 iP:, Vertical
" '- RatØ~~ Section
./100ft)
~/
Comment
565670.20 E
565669.62 E
565667.70 E
565662.56 E
565654.72 E
565644.19 E
565631.01 E
565615.20 E
565596.80 E
565575.85 E
565552.40 E
565526.50 E
565512.22 E
565498.31 E
565468.53 E
565437.29 E
565404.62 E
565370.55 E
565367.53 E
565335.68 E
565322.84 E
0.000
1.500
1.500
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
1.750
1.750
1 .750
1.750
1.750
1.750
0.000
0.000
565300.37 E /' 4.000
565263.08 E 4.000
0.00
0.00 Begin Dir @ 1.5000/100ft: 300.00ft
MD, 300.00ft TVD
1.16
2.07 Dir Rate Increase @ 2.7500/100f\~
433.33ftM D ,433.30ftTVD
5.08
13.15
25.45
41.95
62.63
87.43
116.29
149.15
185.93
226.55
248.94 Decrease in Dir Rate @ 1.7500/100ft:
1451.52ft MD, 1402.34ft TVD
270.75
317.47
366.47
417.71
471.14
~
475.87 End Dir, Start Sail @ 38.000° :
1908.66ftMD,1781.02ftTVD
525.83
545.97 Begin Dir @ 4.0000/100ft: 2036.81ft
MD,1882.00ftTVD
581.58
642.10
DrHlQuest 2.00.09.008
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured
Depth
(ft)
Incl.
Azim.
2300.00 48.435 328.056
2400.00 52.408 328.666
2500.00 56.383 329.213
2600.00 60.361 329.713
2700.00 64.340 330.174
2800.00 68.321 330.606
2859.24 70.680 330.850
2900.00 70.680 330.850
3000.00 70.680 330.850
3100.00 70.680 330.850
3200.00 70.680
3300.00 70.680
3400.00 70.680
3500.00 70.680
3600.00 70.680
3700.00 70.680",
3800.00 70.680
3900.00 70.&80
4000.00 7Ò~680
4100.00 70.680'
330.850
330.850
330.850
330:8~91.>"
3~Cðet.!<!1i¡'
.- 'I
'.. 330J~5(f'
330.$50
"$30.850
" 330~850
, ',: 330.850
4200.00 70.680 330.850
4300.00 70.680 330.850
4400.00 70.680 330.850
4500.00 70.680 330.850
4600.00 70.680 330.850
4700.00 70.680 330.850
4800.00 70.680 330.850
4900.00 70.680 330.850
5000.00 70.680 330.850
5100.00 70.680 330.850
11 September, 2002 - 13:27
Sub-Sea
Depth
(ft)
2006.85
2070.55
2128.76
2181.19
2227.58
2267.72
2288.46
2301.95
2335.03
2368.12
Vertical
Depth
(ft)
2073.55
2137.25
2195.46
2247.89
2294.28
2334.42
2355.16
Sperry-Sun Drilling Services
Proposal Report for MPS-29 6.0
Revised: 11 September, 2002
Local Coordinates
Northings Eastings
(ft) (ft)
660.60 N
726.21 N
795.85 N
869.17 N
945.83 N
441.31 W
481.72 W
523.65 W
566.90 W
2368.65
2401.73 -{~'Jt':, '.
;~~:l;Ä.L;:î354.69 N
to' ~1437.10N
1519.52 N
1601.94 N
1684.35 N
2599.71
2632.79
2665.88
2698.96
2732.05
2765.13
2798.22
2831.30
2864.38
2897.47
2930.55
2963.64
2996.72
3029.81
2633.32
2666.41
2699.49
2732.58
2765.66
2798.75
2831.83
2864.92
2898.00
2931.08
2964.17
2997.25
3030.34
3063.42
3096.51
1766.77 N
1849.19 N
1931.60 N
2014.02 N
2096.43 N
2178.85 N
2261.27 N
2343.68 N
2426.10 N
2508.52 N
2590.93 N
2673.35 N
2755.77 N
2838.18 N
2920.60 N
840.25 W
886.22 W
932.19 W
978.15 W
1024.12 W
1070.09 W
1116.05 W
1162.02 W
1207.99 W
1253.95 W
1299.92 W
1345.89 W
1391.85 W
1437.82 W
1483.79 W
1529.75 W
1575.72 W
1621.69 W
1667.65 W
1713.62 W
P8ge30f9
Global Coordina
Northings
(ft)
,~-
6000~.6T1'J
,~'~:~~',~,
c':~00åQ{).33 N,'
6ØQ081ß:60 N
:r~,;'. . --'~:~
-.~~~.".
6000955.81 N
6001003.97 N
6001037.40 N
6001119.41 N
6001201.42 N
6001283.43 N
6001365.43 N
6001447.44 N
6001529.45 N
6001611.46 N
6001693.47 N
6001775.48 N
6001857.49 N
6001939.50 N
6002021.51 N
6002103.52 N
6002185.53 N
6002267.54 N
6002349.54 N
6002431.55 N
6002513.56 N
6002595.57 N
6002677.58 N
6002759.59 N
6002841.60 N
565005.46 E
564977.91 E
564958.88 E
564912.19 E
564865.50 E
564818.81 E
564772.12 E
564725.43 E
564678.74 E
564632.05 E
564585.36 E
564538.67 E
564491.98 E
564445.29 E
564398.60 E
564351.91 E
564305.22 E
564258.53 E
564211.84 E
564165.15 E
564118.46 E
564071.77 E
564025.09 E
563978.40 E
563931.71 E
_~~~f~11~.
'~--~o:=~f,:: :~~~~
, /100ft)
4.000 707.45
4.000 777.31
4.000 851.36
4.000 929.22
4.000 1010.51
BPXA
Milne Point MPS
Comment
~
4.000 1094.85
4.000 1146.08 End Dir, Start Sail @ 70.680° :
2859.24ftMD,2355.16ftTVD
0.000 1181.62
0.000 1268.82
0.000 1356.03
0.000 1443.23
0.000 1530.44
0.000 1617.64
0.000 1704.85
0.000 1792.05
0.000 1879.25
0.000 1966.46
0.000 2053.66
0.000 2140.87
0.000 2228.07
0.000 2315.27
0.000 2402.48
0.000 2489.68
0.000 2576.89
0.000 2664.09
0.000 2751.30
0.000 2838.50
0.000 2925.70
0.000 3012.91
0.000 3100.11
~!
DrlllQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MPS-29 6.0
Revised: 11 September, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit ,,,,~~. Milne Point MPS
--,
Measured Sub-Sea Vertical Local Coordinates Global Coordina ":~,~;"D~=~"~ '~'f':~~~~
Depth Incl. Azim. Depth Depth Northings Eastings Northings Comment
(ft) (ft) (ft) (ft) (ft) (ft) ''';/1 OOft)
~~(-~
5200.00 70.680 330.850 3062.89 3129.59 3003.02 N 1759.59 W 6002923XiHt.I 56 0.000 3187.32
5300.00 70.680 330.850 3095.97 3162.67 3085.43 N 1805.55 W ;,æ:~~l 5638 .3E 0.000 3274.52
5400.00 70.680 330.850 3129.06 3195.76 3167.85 N 1851.52 W 563791.64 E 0.000 3361.72
5500.00 70.680 330.850 3162.14 3228.84 3250.27 N 1897.49 W 563744.95 E 0.000 3448.93
5600.00 70.680 330.850 3195.23 3261.93 3332.68 N 1 6Ö932$:f~65 KI 563698.26 E 0.000 3536.13 ~
-"r'::,~"'.~-"
~¡ci"ii'..~"
5700.00 70.680 330.850 3228.31 3295.01 6003333.66 N 563651.57 E 0.000 3623.34
5800.00 70.680 330.850 3261.40 3328.10 6003415.66 N 563604.88 E 0.000 3710.54
5900.00 70.680 330.850 3294.48 3361.18 6003497.67 N 563558.19 E 0.000 3797.75
6000.00 70.680 330.850 3327.57 3394.27 6003579.68 N 563511.50 E 0.000 3884.95
6100.00 70.680 330.850 3360.65 3427.35 6003661 .69 N 563464.81 E 0.000 3972.15
6200.00 70.680 330.850 3460.43' ' '3827.18 N 2219.25 W 6003743.70 N 563418.12 E 0.000 4059.36
6300.00 70.680 330.850 3493.52 ' 3909.60 N 2265.22 W 6003825.71 N 563371.43 E 0.000 4146.56
6400.00 70.680 330.850 '3526..60 3992.02 N 2311.19 W 6003907.72 N 563324.74 E 0.000 4233.77
6500.00 70.680 330.850 3559~69 ' 4074.43 N 2357.15 W 6003989.73 N 563278.05 E 0.000 4320.97
6600.00 70.680 330.850 3592.77 4156.85 N 2403.12 W 6004071.74 N 563231.36 E 0.000 4408.17
.0t1iJ~!~?,
6700.00 70.680 38Q;850 ",;' 3625.86 4239.26 N 2449.09 W 6004153.75 N 563184.67 E 0.000 4495.38
6800.00 70.68Cl:;," 33().$~:\' 3 3658.94 4321.68 N 2495.05 W 6004235.76 N 563137.98 E 0.000 4582.58
6900.00 70.680:'~33Ó.85b 3625.33 3692.03 4404.10 N 2541.02 W 6004317.77 N 563091.29 E 0.000 4669.79
7000.00 70~680" '330.850. 3658.41 3725.11 4486.51 N 2586.99 W 6004399.77 N 563044.60 E 0.000 4756.99
7100.00 1Ø~68o. ,.:' 330.850 3691.49 3758.19 4568.93 N 2632.95 W 6004481.78 N 562997.91 E 0.000 4844.20
7200.00 70.6$0 330.850 3724.58 3791.28 4651.35 N 2678.92 W 6004563.79 N 562951 .22 E 0.000 4931.40
7300.00 70.680 330.850 3757.66 3824.36 4733.76 N 2724.89 W 6004645.80 N 562904.53 E 0.000 5018.60 ~
7400.00 70.680 330.850 3790.75 3857.45 4816.18 N 2770.85 W 6004727.81 N 562857.85 E 0.000 5105.81
7500.00 70.680 330.850 3823.83 3890.53 4898.60 N 2816.82 W 6004809.82 N 562811.16 E 0.000 5193.01
7600.00 70.680 330.850 3856.92 3923.62 4981.01 N 2862.79 W 6004891 .83 N 562764.47 E 0.000 5280.22
7700.00 70.680 330.850 3890.00 3956.70 5063.43 N 2908.75 W 6004973.84 N 562717.78 E 0.000 5367.42
7800.00 70.680 330.850 3923.08 3989.78 5145.85 N 2954.72 W 6005055.85 N 562671.09 E 0.000 5454.62
7900.00 70.680 330.850 3956.17 4022.87 5228.26 N 3000.69 W 6005137.86 N 562624.40 E 0.000 5541.83
8000.00 70.680 330.850 3989.25 4055.95 5310.68 N 3046.66 W 6005219.87 N 562577.71 E 0.000 5629.03
8061.36 70.680 330.850 4009.55 4076.25 5361.25 N 3074.86 W 6005270.18 N 562549.06 E 0.000 5682.54
11 September, 2002 - 13:27
Page4of9
DrHlQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MPS-29 6.0
Revised: 11 September, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit :~ Milne Point MPS
"
Measured Sub-Sea Vertical Local Coordinates Global Coordina ,~;},D()Qtèg ~~ '" Vèrtical
Depth Incl. Azim. Depth Depth Northings Eastings Northings ''-o'~:, Rå$, Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) '''~/1 OOft)
8061 .97 70.680 330.850 4009.76 4076.46 5361.75 N 3075.14 W 6005 0.000 5683.07 Begin Dir @ 4.000°/1 OOft : 8061.97ft
,*~~, MD, 4076.46ft TVD
~ ;;..,. .,,,,,,' MPS-29 Pump Target-
8100.00 72.192 331.029 4021.86 4088.56 3092.65 W c~~0530K04~., 562530.99 E 4.000 5716.41
8200.00 76.168 331.486 4049.12 4115.82 3 ~53~~98 N 562483.99 E 4.000 5805.56 ~
8300.00 80.144 331.927 4069.64 4136.34 60054't1.73 N 562436.86 E 4.000 5896.53
8400.00 84.121 332.358 4083.33 4150.03 6005558.88 N 562389.82 E 4.000 5988.88
8488.71 87.650 332.735 4089.69 4156.39 5 6005637.02 N 562348.34 E 4.000 6071.60 End Dir, Start Sail @ 87.650° :
8488.71 ftMD,4156.39ftTVD
8500.00 87.650 332.735 4090.15 4156.85J"lJf~'t. 5739. 6005647.00 N 562343.09 E 0.000 6082.16
8600.00 87.650 332.735 4094.25 4160.95{{~:.~7:5828.68 6005735.41 N 562296.54 E 0.000 6175.69
8700.00 87.650 332.735 4098.35 :~~;:"<~~:{j~~::; ~ 6005823.82 N 562249.98 E 0.000 6269.23
8707.16 87.650 332.735 4098.65 6005830.15 N 562246.65 E 0.000 6275.93 Begin Dir @ 4.0000/100ft: 8707.16ft
MD, 4165.35ftTVD
..
'.
8800.00 87.667 336.452 4169;,1'4 6007.63 N 3412.12 W 6005913.58 N 562206.13 E 4.000 6363.77
8900.00 87 .697 3"!o.--~,, 4173.19 6100.55 N 3448.81 W 6006006.17 N 562168.62 E 4.000 6460.32
9000.00 87 .738 ~.458:,\t 4177.17 6195.80 N 3478.92 W 6006101.15 N 562137.67 E 4.000 6558.43
9100.00 87.790:'-' 348:461';' 4181.07 6292.93 N 3502.31 W 6006198.07 N 562113.43 E 4.000 6657.62
9200.00 87;,,853-- ;', ',352A&3 4118.18 4184.88 6391.45 N 3518.87 W 6006296.45 N 562096.01 E 4.000 6757.40
9300.00 81:;~2l" ..: 356.465 4121.86 4188.56 6490.90 N 3528.51 W 6006395.80 N 562085.50 E 4.000 6857.29
9388.33 88~OOO::' 0.000 4125.00 4191.70 6579.12 N 3531.23 W 6006484.00 N 562082.00 E 4.000 6945.23 Dir Rate Increase @ 12.0000/100ft:
9388.33ftMD ,4191.70ftTVD
Target - MPS-29 T1 ~
9400.00 88.003 1.401 4125.41 4192.11 6590.78 N 3531.09 W 6006495.66 N 562082.04 E /12.000 6956.79
9500.00 88.078 13.408 4128.84 4195.54 6689.71 N 3518.23 W 6006594.69 N 562094.02 E 12.000 7053.55
9600.00 88.237 25.413 4132.07 4198.77 6783.80 N 3485.08 W 6006689.08 N 562126.35 E 12.000 7143.15
9700.00 88.473 37.416 4134.95 4201.65 6868.95 N 3433.07 W 6006774.68 N 562177.61 E 12.000 7221.68
9800.00 88.776 49.415 4137.36 4204.06 6941.44 N 3364.49 W 6006847.76 N 562245.55 E 12.000 7285.69
9805.78 88.795 50.109 4137.48 4204.18 6945.17 N 3360.07 W 6006851 .54 N 562249.93 E 12.000 7288.88 End Dir, Start Sail @ 88.795° :
9805.78ftMD,4204.18ftTVD
9900.00 88.795 50.109 4139.46 4206.16 7005.58 N 3287.80 W 6006912.58 N 562321.67 E 0.000 7340.48
10000.00 88.795 50.109 4141.56 4208.26 7069.70 N 3211.09 W 6006977.37 N 562397.81 E 0.000 7395.24
11 September, 2002 - 13:27
Page50f9
DrHlQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MP5-29 6.0
Revised: 11 September. 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit .-:1~ Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordina .,~~~,:'- DogfØg ;(5j"" V~~tical
Depth Incl. Azim. Depth Depth Northings Eastings Northings .' R~' 7' Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) /1 OOft)
10049.79 88.795 50.109 4142.61 4209.31 7101.62 N 3172.90 W 6007 0.000 7422.50 Begin Dir @ 4.0000/100ft: 10049.79f1
~., MD,4209.31ftTVD
10100.00 87.412 51.566 4144.27 4210.97 7133.31 N 3133.99 W - p007~ 1.66~r;.I 562474.35 E 4.000 7449.45
10114.95 87.000 52.000 4145.00 4211.70 7142.55 N 3122.26 W <~.Q07Ò$toOM:, 562486.00 E 4.000 7457.26 Target - MPS-29 T2
10188.32 85.432 54.487 4149.84 4216.54 7186.36 N 3 6ØQ709$:33 N 562544.26 E 4.000 7493.95 ~
10200.00 85.432 54.487 4150.77 4217.47 7193.12 N 60011ð2.17 N 562553.68 E 0.000 7499.57
10300.00 85.432 54.487 4158.74 4225.44 6007160.79 N 562634.31 E 0.000 7547.64
10400.00 85.432 54.487 4166.70 4233.40 6007219.40 N 562714.93 E 0.000 7595.71
10500.00 85.432 54.487 4174.67 4241 .37 6007278.02 N 562795.56 E 0.000 7643.78
10554.43 85.432 54.487 4179.00 4245.70'''~!f,:'"", 6007309.92 N 562839.45 E 0.000 7669.95 End Dir, Start Sail @ 85.432° :
10554.43ftMD,4245.70ftTVD
10600.00 85.856 52.709 4182.46 ,4?~~l6'~;:; -,<)':"Z425.32 N 2729.98 W 6007337.21 N 562875.78 E 4.000 7692.48
"
10700.00 86.800 48.814 lì255~57 â':"7488.43 N 2652.70 W 6007401.00 N 562952.50 E 4.000 7746.17
10720.92 87.000 48.000 .,<--~2~q!l :': 7502.30 N 2637.08 W 6007415.00 N 562968.00 E 4.000 7758.13 Begin Dir @ 4.0000/100ft: 10720.92f1
MD, 4256.70ft TVD
Target - MPS-29 T3
10756.05 4258.37 7526.07 N 2611.27W 6007439.00 N 562993.60 E 4.000 7778.74 End Dir, Start Sail @ 87.554° :
1 0756.05ftMD ,4258.37ftTVD
10800.00 8],.55 4260.24 7556.18 N 2579.31 W 6007469.39 N 563025.29 E 0.000 7804.93
10900.00 87 ~'554 4264.51 7624.69 N 2506.59 W 6007538.54 N 563097.40 E 0.000 7864.51
. ~..,:I ',.
11000.00 87':554 ' , 46.707 4202.08 4268.78 7693.20 N 2433.87 W 6007607.68 N 563169.52 E 0.000 7924.10
11100.00 87 .Š~~ 46.707 4206.35 4273.05 7761.71 N 2361.15 W 6007676.83 N 563241.63 E 0.000 7983.68
11200.00 87.554 46.707 4210.62 4277.32 7830.22 N 2288.43 W 6007745.98 N 563313.75 E 0.000 8043.27 Begin Dir @ 4.0000/100ft: 1126~
11262.53 87.554 46.707 4213.28 4279.98 7873.06 N 2242.96 W 6007789.22 N 563358.84 E 0.000 8080.53
MD, 4279.98ft TVD
11300.00 87.901 45.248 4214.77 4281.47 7899.08 N 2216.04 W 6007815.47 N 563385.53 E 4.000 8103.24
11306.37 87.960 45.000 4215.00 4281.70 7903.57 N 2211.53 W 6007820.00 N 563390.00 E 4.000 8107.17 Target - MPS-29 T4
11320.20 87.961 44.447 4215.49 4282.19 7913.39 N 2201.81 W 6007829.90 N 563399.64 E 4.000 8115.79 End Dir, Start Sail @ 87.961° :
11320.20ftMD,4282.19ftTVD
11400.00 87.961 44.447 4218.33 4285.03 7970.33 N 2145.96 W 6007887.33 N 563454.98 E 0.000 8165.85
11500.00 87.961 44.447 4221.89 4288.59 8041.67 N 2075.98 W 6007959.29 N 563524.33 E 0.000 8228.57
11600.00 87.961 44.447 4225.45 4292.15 8113.02 N 2006.00 W 6008031.24 N 563593.68 E 0.000 8291.29
11 September. 2002 - 13:27
Page6of9
DrHlQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MP5-29 6.0
Revised: 11 September, 2002
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
11700.00 87.961 44.447 4229.00 4295.70 8184.36 N 1936.02 W
11800.00 87.961 44.447 4232.56 4299.26 8255.71 N 1866.04 W
11900.00 87.961 44.447 4236.12 4302.82 8327.05 N 1796.06 W
11904.84 87.961 44.447 4236.29 4302.99 8330.50 N 1792.67 W
12000.00 88.428 40.667 4239.29 4305.99
12027.00 88.562 39.595 4240.00 4306.70
12100.00 88.562
12200.00 88.562
12300.00 88.562
12400.00 88.562
39.595
39.595
39.595
39.595
4241.83
4244.34
4246.85
4249.36
4308.53('!~j",,;. 8477.
4311.04W'o;~~;8554.46
.;~~;'~(y,<;:"':~:~~~::~ ~
i'?i.".:' ~ ~--
:."'~: ,--~\
12500.00
12600.00
12700.00
12800.00
12900.00
4331.12
4331.70
" ' '- :131.it;!?7~', .
';.7432lXl8
4323.59
4326.10
4328.61
13000.00
13023.26
4264.42
4265.00
, .
8785.55 N
8862.59 N
8939.62 N
9016.65 N
9093.69 N
9170.72 N
9188.64 N
Global Coordina
Northings
(ft) c~
~4t/jj
60081.Q3:20r~
~J75.1a~
. ~6Öä~~7 .12l~
:,~08~c~.60 ~é'
6ôf:iš321.21 N
6008342.00 N
-:~~~~~~.
- "
~':~~~(D~=~~:\Ù :~~~~
o/100ft)
563868.79 E
563886.00 E
6008398.64 N 563932.02 E
6008476.23 N 563995.05 E
6008553.82 N 564058.09 E
6008631.41 N 564121.12 E
1409.59 W 6008709.00 N 564184.16 E
1345.87 W 6008786.59 N 564247.19 E
1282.16W 6008864.18 N 564310.23 E
1218.44 W 6008941 .77 N 564373.26 E
1154.73 W 6009019.36 N 564436.30 E
1091.01 W 6009096.95 N 564499.33 E
1076.19 W 6009115.00 N 564514.00 E
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 25.872° (10-Sep-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 353.320° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13023.26ft.,
The Bottom Hole Displacement is 9251.45f1., in the Direction of 353.320° (True).
11 September, 2002 - 13:27
Page 70t9
BPXA
Milne Point MPS
Comment
0.000 8354.01
0.000 8416.73
0.000 8479.45
0.000 8482.48 Begin Dir @ 4.000°/1 OOft: 1190'-
MD, 4302.99ft TVD ~
4.000 8544.58
4.000 8563.05 End Dir, Start Sail @ 88.562° :
12027 .00ftMD,4306.70ftTVD
Target - MPS-29 T5
0.000 8613.49
0.000 8682.59
0.000 8751.69
0.000 8820.78
0.000 8889.88
0.000 8958.98
0.000 9028.08
0.000 9097.18
0.000 9166.27
0.000 9235.37
0.000 9251.45 Total Depth:
13023.26ftMD,4331.70ftTVD
Target - MPS-29 T6
~/
DrH/Quest 2.00.09.008
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Comments
Measured
Depth
(ft)
300.00
433.33
1451.52
1908.66
2036.81
2859.24
8061.97
8488.71
8707.16
9388.33
9805.78
10049.79
10554.43
10720.92
10756.05
Station Coordinates
TVD Northin9s Eastin9s
~ij (ffl ~)
300.00
433.30
1402.34
1781.02
1882.00
2355.16
4076.46
4156.39
4165.35
4191.70
4204.18
4209.31
4245.7Q,
4?56.7Q'
4298.31:
, 4~~¡aa
, ''A2B2.'t9
,..99
J4306.70
4331.70
11 September, 2002 - 13:27
O.OON
1.93 N
232.29 N
444.05 N
509.45 N
1073.84 N
5361.75 N
5729.84 N
5923.85 N
6579.12 N
7873.06 N
7913.39 N
8330.50 N
8421.19 N
9188.64 N
0.00 E
1.30W
156.68 W
299.51 W
343.63 W
683.62 W
~~~1ft,~,-
,r¿;~~;)
'-'-'><-
,'08W
.2.90W
2766.55 W
2637.08 W
2611.27 W
2242.96 W
2201.80 W
1792.67 W
1710.96 W
1076.19 W
Sperry-Sun Drilling Services
Proposal Report for MPS-29 6.0
Revised: 11 September, 2002
Comment
~~~:
",,-.
Begin Dir @ 1 .500°/1 OOft : 3dô.00ff'MD, 3Qo.00ft TVD
Dir Rate Incre~~;~i~7500/1 öØf!~: 4~~~33ftMD,433.30ftTVD
Decreas~iÐ ~Fiate't,1.7500/100ft/1451.52ft MD, 1402.34ftTVD
End ir, StWt SåiL~}68.0000: 1908.66ftMD,1781.02ftTVD
Be '100ft:2036.81ftMD,1882.00ftTVD
70.680° : 2859.24ftMD,2355.16ftTVD
B .0000/100ft: 8061.97ft MD, 4076.46ftTVD
End tart Sail @ 87.650° : 8488.71ftMD,4156.39ftTVD
Begin Dir @ 4.0000/100ft: 8707.16ft MD, 4165.35ftTVD
Dir Rate Increase @ 12.0000/100ft: 9388.33ftMD,4191.70ftTVD
End Dir, Start Sail @ 88.795° : 9805.78ftMD,4204.18ftTVD
Begin Dir @ 4.000°/1 0 Oft : 10049.79ft MD, 4209.31ft TVD
End Dir, Start Sail @ 85.432° : 10554.43ftMD,4245.70ftTVD
Begin Dir @ 4.0000/100ft: 10720.92ft MD, 4256.70ft TVD
End Dir, Start Sail @ 87.554° : 10756.05ftMD,4258.37ftTVD
Begin Dir @ 4.0000/100ft: 11262.53ft MD, 4279.98ft TVD
End Dir, Start Sail @ 87.961° : 11320.20ftMD,4282.19ftTVD
Begin Dir @ 4.0000/100ft: 11904.84ft MD, 4302.900 TVD
End Dir, Start Sail @ 88.562° : 12027.00ftMD,4306.70ftTVD
Total Depth: 13023.26ftM D ,4331. 70ftTVD
PageBof9
BPXA
Milne Point MPS
'-..ø'
......,'
DrHlQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MP5-29 6.0
Revised: 11 September, 2002
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Targets associated with this wellpath
Target
Name
MPS-29 Pump Target-
MPS-29 T1
MPS-29 T2
MPS-29 T3
MPS-29 T4
MPS-29 T5
MPS-29 T6
11 September, 2002 - 13:27
Page90f9
BPXA
Milne Point MPS
Target Target
Shape Type
5361.75 N 3075.14 W Point
~
6579.12 N 3531.23 W Point
4211.70 7142.55 N 3122.26 W Point
4256.70 7502.30 N 2637.08 W Point
4281.70 7903.57 N 2211.53 W Point
4306.70 8421.19 N 1710.96 W Point
4331.70 9188.64 N 1076.19 W Point
~
Drll/Quest 2.00.09.008
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
DATE CHECK NO.
8/01/02 H207045
VENDOR
DISCOUNT NET
$100.00 H
H
207045
08/01/02 CK073102L
Permit To Dril~ Fee
E
ì:
~
~:"~..,,
.'
'ì
I
rYlf0-'19 i; L I
PIs contact Sandra Stewman X4750
for check pickup
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
$100.00
BP EXPLORATION, (ALASKA) INC.
P.o. BOX 196612
ANCHORAGE, ALASKA 99519.6612
FIRST NATIONAL BANK OF ASHLAND
ANAFFIUATE OF
NATIONAL CITY BANK
CLEVELAND. OHIO
No. H 20<7045
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
4t2
PAY
B" P'." . r:,,I_",.,'.',.~I',,'~ ølUt,'.,J,'. ,tlU',,1 ¡,''',',. ....., ""b, ",f,l.
..~ .,1 1/ " ..,. '~I ..
,'. . .~, (II~ 1m' I ,utm ."n~ .....
AMOUNT
TO THE
ORDER
OF
Alaska Oil & GasConservatiçm
333 W 7th Ave, stel00 '
Anchorage, AI< 99501
* * * * * $100...00* ***'ir*
NOTNAUD AFTER 120 DAYS
lð¡l~:.:!;~~¡:.~;~'::;¡~:t~¥J~1
III 2 0 ? 0 ~ Sill I: 0... ~ 2 0 ~ a q 5 I: 0 0 a ~... ~ Ii II'
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/1 0/02
C\jody\templates
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number stated
above.
In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (SO
70/80) from records, data and logs acquired
for well (name on permit). '
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY ~ Y WELL NAME /1/¿, H~-;? 7 PROGRAM: Exp - Dev ~ Redrll - Re-Enter - Serv - Wellbore seg -
FIELD & POOL .525 / ~ ~ INIT CLASS ~j/ / -Ój"j r ~ GEOL AREA r9 n UNIT# 113' ¿ <¡ ON/OFF SHORE ..o.LJ
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . Y N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
æ, /:'~...~? 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
ff( . ~<-- 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . \.YJ N
(Service Well Only) 13. Well located w/in ar,ea & strata authorized by injection order#- ~Y, '/U.r:l.
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. k... N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ~N
16. Surface casing protects all known USDWs. . . . . . . . . . . O/'N £L.Îo;:;., L
17. CMT vol ádequate to circulate on conductor & surf csg. . . . . (j) N ~- "--'-:(l~- ~.
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y £Þ I J L ¡
19. CMT will cover all known productive horizons. . . . . . . . . . '~¥ N ~~
20. Casing designs adequate for C, T, B & permafrost. . .. . . . , N D
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . ,N ~ c>V'- /41
22. If a re-drill, has a 10-403 for abandonment been approved. . . '¥-N-I\L/N
23. Adequate wellbore separation proposed.. . . . . . . . . . . . N
24. If diverter required, does it meet regulations. . . . . . . . . . N a t>
25. Drilling fluid program schematic & equip list adequate. . . . . N ~ /Yl kI 7,. J... f ¡/c-'1' .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N,.. F
APPR DATE 27. BOPE press rating appropriate; testto t.fco 0 psig. N J41,c> e 1&/12 ps i.- "
Â- I . J 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
1¡./C¡,"'{' ~ 12 ~/() i- 29. Work will occur without operation shutdown. . . . . . . . . . . N
30. Is presence of H2S gas probable... . . . . . . . . . . . . . . Y (6j)
31. Mechanical condition of wells within AOR verified. . . . . . . . -¥--N""" ^'-/A:-
@
){ A),,q.
RESERVOIR ENGINEERING UIC ENGINEER
(Service Well Only)
GEOLOGY
APPR DATE
g ~þ2-
(Exploratory Only)
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . .
36. Contact name/phone for weekly progress reports. . . . . . . .
GEOLOGY:
RPH,
PETROLEUM ENGINEERING:
TEM
JDH
JBR
Rev: 07/12/02
SFD-
WGA \tJ6A-
MJW
G:\geology\permits\checklist.doc
COMMISSIONER:
COT ccr
DTS
Commentsllnstructions:
)
')
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simpltfy finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special 'effort has been made to chronologically
organize this category of information.
)
')
a 0;)-/ c¡s
t l3 7{~
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Dec 09 08:52:49 2002
Reel Header
Service name.... ..... ... .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... ..... ....... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments..... ...... ..... .STS LIS Writing
Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............. ...UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments........ ..... ....STS LIS Writing
Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point Unit
MWD /MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-29
500292311900
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
09-DEC-02
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
B. ZIEMKE
C. DIXON
MWD RUN 4
R. FRENCH
E. VAUGHN
MWDRUN 2
MWDRUN 3
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
B. HENNINGSE
C. DIXON
B. HENNINGSE
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3270
340
MSL 0)
66.60
39.10
)
)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 108.0
6.125 7.625 9237.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 - 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). RUN 4 ALSO INCLUDED
AT-BIT-INCLINATION
(ABI) .
4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 10/16/02. MWD DATA
ARE CONSIDERED
PDC.
5. MWD RUNS 1 - 4 REPRESENT WELL MPS-29 WITH API#:
50-029-23119-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
12950'MD/4313'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.. ....... ..1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type.... ... ........ .LO
Previous File Name..... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
1
clipped curves; all bit runs merged.
.5000
)
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
START DEPTH
64.0
64.0
64.0
64.0
64.0
71.5
109.0
STOP DEPTH
12903.0
12903.0
12903.0
12903.0
12903.0
12896.0
12950.0
)
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 64.0 3213.5
MWD 2 3213.5 7508.5
MWD 3 7508.5 9248.0
MWD 4 9248.0 12950.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type............. .....0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point... ...... .... .Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.... ........ . Undefined
Absent value............. .... ... ..-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD FT/H
GR MWD API
RPX MWD OHMM
RPS MWD OHMM
RPM MWD OHMM
RPD MWD OHMM
FET MWD HOUR
Min
64
2.69
4.48
0.1
0.07
0.07
0.07
0.02
Max
12950
1890
127.26
2000
2000
2000
2000
80.99
Mean
6507
329.42
67.9671
116.123
90.1393
88.0199
148.86
0.75326
Nsam
25773
25683
25650
25679
25679
25679
25679
25679
First Reading For Entire File......... .64
First
Reading
64
109
71.5
64
64
64
64
64
Last
Reading
12950
12950
12896
12903
12903
12903
12903
12903
Last Reading For Entire File........ ...12950
File Trailer
Service name. ..... ...... .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/12/09
Maximum Physical Record. .65535
File Type... ... ......... .LO
Next File Name....... ....STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation... ... .02/12/09
Maximum Physical Record. .65535
File Type. . . . .. ..... . ... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPS
RPM
RPD
FET
GR
ROP
$
2
)
header data for each bit run in separate files.
1
.5000
START DEPTH
64.0
64.0
64.0
64.0
64.0
71.5
109.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
3169.5
3169.5
3169.5
3169.5
3169.5
3177.0
3213.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
01-0CT-02
Insite
66.37
Memory
3213.0
108.0
3213.0
2.1
73.1
TOOL NUMBER
66093
103792
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........ ...... ....0
Data Specification Block Type.....O
Logging Direction.. ....... ...... ..Down
Optical log depth units.... ..... ..Feet
Data Reference Point........ .... ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. ........... . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
')
9.875
108.0
LSND
9.10
102.0
7.5
600
11.4
7.800 72.0
8.220 68.0
8.000 72.0
5.700 72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
Max
3213.5
1798.06
118.58
2000
2000
2000
2000
2.36
Min
64
17.43
16.08
0.1
0.07
0.07
0.07
0.02
MWD010
MWD010
MWD010
MWD010
MWD010
MWD010
MWD010
First Reading For Entire File..... ... ..64
Last Reading For Entire File......... ..3213.5
Mean
1638.75
300.231
61.2295
427.578
318.097
291.288
542.34
0.332265
First
Reading
64
109
71.5
64
64
64
64
64
Nsam
6300
6210
6212
6212
6212
6212
6212
6212
Last
Reading
3213.5
3213.5
3177
3169.5
3169.5
3169.5
3169.5
3169.5
)
File Trailer
Service name.......... ...STSLIB.002
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation. ..... .02/12/09
Maximum Physical Record..65535
File Type................ LO
Next File Name......... ..STSLIB.003
Physical EOF
File Header
Service name.......... ...STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type............. ...LO
Previous File Name.... ...STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
FET
RPD
RPX
RPM
GR
ROP
$
3
")
header data for each bit run in separate files.
2
.5000
START DEPTH
3170.0
3170.0
3170.0
3170.0
3170.0
3177.5
3214.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
7464.0
7464.0
7464.0
7464.0
7464.0
7472.0
7508.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
03-0CT-02
Insite
66.37
Memory
7508.0
3213.0
7508.0
67.2
74.2
TOOL NUMBER
66093
103792
9.875
')
#
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type. ......... ........0
Data Specification Block Type.....O
Logging Direction.... ........ .....Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................ .... .60 .1IN
Max frames per record............ . Undefined
Absent value..... ................ .-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
)
108.0
LSND
9.20
134.0
7.0
500
9.4
8.000 75.0
7.910 75.9
8.000 75.0
6.000 75.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
MWD020
MWD020
MWD020
MWD020
MWD020
MWD020
MWD020
Min
3170
11.03
4.48
4.52
3.79
1.14
1.69
0.05
Max
7508.5
1890
114.74
273.27
412.97
1390.59
1445.87
8.06
First Reading For Entire File... ...... .3170
Last Reading For Entire File.......... .7508.5
Mean
5339.25
488.312
65.5595
15.9172
16.2883
16.6864
17.9489
0.41744
Nsam
8678
8590
8590
8589
8589
8589
8589
8589
First
Reading
3170
3214
3177.5
3170
3170
3170
3170
3170
Last
Reading
7508.5
7508.5
7472
7464
7464
7464
7464
7464
)
File Trailer
Service name. ...... ..... .STSLIB.003
Service Sub Level Name. . .
Version Number..... ..... .1.0.0
Date of Generation.. .... .02/12/09
Maximum Physical Record..65535
File Type................LO
Next File Name. ......... .STSLIB.004
physical EOF
File Header
Service name...... ...... .STSLIB.004
Service Sub Level Name. . .
Version Number.... ...... .1.0.0
Date of Generation... ....02/12/09
Maximum Physical Record..65535
File Type.... ........... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPX
RPS
RPD
RPM
GR
ROP
$
4
")
header data for each bit run in separate files.
3
.5000
START DEPTH
7464.5
7464.5
7464.5
7464.5
7464.5
7472.5
7509.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
9203.5
9203.5
9203.5
9203.5
9203.5
9211.0
9248.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
04-0CT-02
Insite
66.37
Memory
9248.0
7508.0
9248.0
67.6
88.7
TOOL NUMBER
66093
103792
9.875
108.0
J
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..... .... .........0
Data Specification Block Type.....O
Logging Direction.. .............. . Down
Optical log depth units. ......... .Feet
Data Reference Point. ............ . Undefined
Frame Spacing.. .................. .60 .1IN
Max frames per record. .......... ..Undefined
Absen t value... . . . . . . . . . . . . . . . . . . . - 9 9 9
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
LSND
9.20
111.0
7.0
500
8.6
3.500
2.580
7.000
3.300
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
Min
7464.5
11.23
29.51
4.84
4.94
5.05
5.22
0.07
Max
9248
819.68
110.78
567.44
114.05
84.45
80.88
17.4
MWD030
MWD030
MWD030
MWD030
MWD030
MWD030
MWD030
First Reading For Entire File....... ...7464.5
Last Reading For Entire File.......... .9248
Mean
8356.25
210.759
74.5025
17.5679
17.6889
18.6274
19.5477
0.86413
Nsam
3568
3479
3478
3479
3479
3479
3479
3479
)
75.0
104.0
75.0
75.0
First
Reading
7464.5
7509
7472.5
7464.5
7464.5
7464.5
7464.5
7464.5
Last
Reading
9248
9248
9211
9203.5
9203.5
9203.5
9203.5
9203.5
)
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type................LO
Next File Name.. ...... ...STSLIB.005
physical EOF
File Header
Service name.... ........ .STSLIB.005
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation..... ..02/12/09
Maximum Physical Record. .65535
File Type.. ............. .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPX
RPS
GR
ROP
$
5
header data for each bit run in separate files.
4
.5000
START DEPTH
9204.0
9204.0
9204.0
9204.0
9204.0
9211.5
9248.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
12903.0
12903.0
12903.0
12903.0
12903.0
12896.0
12950.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
09-0CT-02
Insite
66.37
Memory
12950.0
9248.0
12950.0
84.7
91.5
TOOL NUMBER
91360
162742
6.125
9237.0
)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.. ............ ...Down
Optical log depth units.......... .Feet
Data Reference Point...... ....... . Undefined
Frame Spac ing. . . . . . . . . . . . . . . . . . . . . 60 . 1 IN
Max frames per record... ....... ...Undefined
Absent value................... ...-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
)
Flo-Pro
9.15
70.0
8.0
22000
3.6
.200
.170
.300
.600
75.0
92.0
75.0
75.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPM MWD040 OHMM 4 1 68 16 5
RPD MWD040 OHMM 4 1 68 20 6
FET MWD040 HOUR 4 1 68 24 7
RPS MWD040 OHMM 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9204 12950 11077 7493 9204 12950
ROP MWD040 FT/H 2.69 797.76 225.316 7404 9248.5 12950
GR MWD040 API 32.84 127.26 73.368 7370 9211.5 12896
RPX MWD040 OHMM 0.73 1551.7 17.2964 7399 9204 12903
RPM MWD040 OHMM 0.37 2000 32.7962 7399 9204 12903
RPD MWD040 OHMM 0.75 2000 31.2746 7399 9204 12903
FET MWD040 HOUR 0.14 80.99 1.44442 7399 9204 12903
RPS MWD040 OHMM 1.01 1730.45 18.5464 7399 9204 12903
First Reading For Entire File......... .9204
Last Reading For Entire File. .... ..... .12950
File Trailer
')
)
Service name.. ........ ...STSLIB.005
Service Sub Level Name...
Version Number... ...... ..1.0.0
Date of Generation..... ..02/12/09
Maximum Physical Record. .65535
File Type............... .LO
Next File Name........ ...STSLIB.006
Physical EOF
Tape Trailer
Service name. .... ....... .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 02/12/09
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.. ............ ..UNKNOWN
Continuation Number..... .01
Next Tape Name... ....... . UNKNOWN
Comments............... ..STS LIS
Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... ............ . UNKNOWN
Continuation Number..... .01
Next Reel Name..... ... ...UNKNOWN
Comments............... ..STS LIS Writing
Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File