Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-195 . • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 r f l Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue 0 a- 1 Anchorage, Alaska 99501 5 Subject: Corrosion Inhibitor Treatments of MPS -Pad � Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, • Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/1112011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS -02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 729/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 102 7/29/2011 MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS-13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7292011 MPS -15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/312011 MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 729/2011 MPS-17 2021730 50029231150000 Open Flutes - Treated MPS -18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7292011 MPS -21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/32009 MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7282011 MPS -23 2021320 50029230980000 Open Flutes - Treated MPS -24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS-25 2021030 50029230890000 Open Flutes - Treated MPS-26 2030610 50029231500000 1 NA 1 NA 8.5 7282011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 72812011 - ' - "j MPS -29 2021950 50029231190000 Open Flutes - Treated MPS -30 2022360 50029231310000 12 NA 1.2 NA 11.9 7/28/2011 MPS-31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7282011 MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7282011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7282011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/182011 MPS-41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/112011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 916/2011 MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 . . '" MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _ Marker.doc I I ,10 DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 àv Permit to Drill 2021950 Well Name/No. MILNE PT UNIT SB S-29 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23119-00-00 MD 12950- TVD 4313/ Completion Date 10/16/2002 ",' Completion Status 1-01L REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, GYRO, ABIIIFRlCASANDRA Well Log Information: Logl Electr Data Digital Dataset Type Med/Frmt Number Name ~_.-Rpt MIS Verification ED 0--'''- ED D Rpt Rpt ED \e'''/ ED C Asc ED C Pdf ED C Pdf 12950 Open 11/1/2002 MWD A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 9/30/2002. 0 12950 Open 11/1/2002 0 12950 Open 11/1/2002 1,2,3,4 64 12950 Open 6/2/2003 1,2,3,4 108 12950 Open 6/2/2003 MWD - ROP, DGR, EWR - MD ----; 1,2,3,4 108 4313 Open 6/2/2003 MWD - DGR, EWR -TVD Sample Set Number Comments Log Log Scale Media Run No 1 1 1 1 / Directional Survey t)Í 1388 LIS Verification A~Ctionalàurvey' -c5í~~ctional Survey Directional Survey (,~ 962 LIS Verification ßA'962 Induction/Resistivity 25 ,Þ~962 Induction/Resistivity 25 Well Cores/Samples Information: Name Interval Start Stop Received Sent Current Status 1-01L €~'_.) -.'--.... . ",.......~-r;¡:.;:>..-~" Directional Survey Yes ,-, (data taken from Logs Portion of Master Well Data Maint) '~ Interval Start Stop 71 12896 0 12950 71 12896 0 OH/ CH Received Comments Case 12/13/2002 Open 11/1/2002 MWD Case 12/13/2002 DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Permit to Drill 2021950 Well Name/No. MILNE PT UNIT SB S-29 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23119-00-00 MD 12950 TVD 4313 Completion Date 10/16/2002 Completion Status 1-01L Current Status 1-01L UIC N ADDITIONAL INFORMATION Well Cored? Y ~ Chips Received? .. Y tN" Daily History Reœived? ð/N ~/N Formation Tops Analysis Received? - Y/N - Comments: '~ Compliance Reviewed By: )L Date: Äß/ J~PHt 1 '" ~ --- ) } &08 -/95 # J I9'ÚJ~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 January 16, 2003 RE: MWD Formation Evaluation Logs: MPS-29, AK-MW-22160 MPS-29: Digital Log Images: 50..029-23119-00 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ReCe\VEÐ DaWN O? ?OO?h A181k1 OR & Gas Coni. ~1\ And\~e éJ-()d -l 4 S Signed~~,~~ ~\.~ --, "",,~~~:. C:\ F,~~\~\~ ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 01/05/03, Start Production 1. Status of Well IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4136' NSL, 3807' WEL, SEC. 01, T12N, R10E, UM (OB) At total depth 1826' NSL, 1513' WEL, SEC. 35, T13N, R10E, UM (OB) 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE= 66.6' ADL 025518 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 9-30-2002 10-9-2002 10-16-2002 17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 12950 4313 FT 12950 4313 FT 0 Yes IBI No 22. Type Electric or Other Logs Run MWD , GR RES, GYRO, ABI I IFR I CASANDRA CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE 28' 112' 4211 28' 9237' 9-7/811 23. CASING SIZE 2011 7-5/811 WT. PER FT. 92# 29.7# GRADE H-40 L-80 CEMENTING RECORD 260 sx Arctic Set (Approx.) 1868 sx PF 'L', 600 sx Class 'G' (Top Job 49 sx PF 'L' ) 6-1/811 Uncemented Slotted Liner 4-1/211 12.7# L-80 9103' 12950' 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/211 Slotted Liner MD TVD TVD MD 9207' - 12948' 4187' - 4313' 27. Date First Production December 11, 2002 Date of Test Hours Tested 12/18/2002 6 PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL -BBL TEST PERIOD 1321 GAs-McF 931 GAs-McF Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL Classification of Service Well 7. Permit Number 202-195 8. API Number 50- 029-23119-00 :;;",",i.OO,',~,¡~, .''',7, " ,""'" 9. Unit or Lease Name ~~J Milne Point Un" ',~ 10. Well Number MPS-29 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) AMOUNT PULLED 25. TUBING RECORD DEPTH SET (MD) 8174' PACKER SET (MD) 8123' SIZE 4-1/211, 12.6#, L-80 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 82 Bbls of Diesel WATER-BBL 0 WATER-BBL CHOKE SIZE GAS-OIL RATIO 705 OIL GRAVITY-API (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. No core samples were taken. Form 10-407 Rev. 07-01-80 RBDMS BFt (~P-- sUbnR'(;rfê~ JAN 0 é i 9 Submit In Duplicate ) 29. Geologic Markers Marker Name Measured True Vertical Depth Depth SBF1-NB 7863' 4013' SBF1-NBR 7877' 4018' SBF12 79211 4034' SBE4-NC 7944' 40431 SBE41 7961' 4049' SBE2-NE 7978' 4055' SBE1-NF 81151 41051 Top of Schradder OA Sand 8202' 4131' TSBC 85331 4159' Top of Schradder 08 Sand 8949' 4178' Top of Schradder OB Sand 128861 4315' 31. List of Attachments: Post Rig Work Summary Report. ) 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GaR, and time of each phase. RECEI JAN 0 6 32. I hereby certify that the f going is true and correct to the best of my knowledge Signed :.~ Tit!e Technical Assistant Date C) t - O~'-06 MPS-29 202-195 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. I"!"EM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: Field: API: Permit: ') ) MPS-29 & MPS-29L 1 Milne Point Unit / Schrader Bluff Field 50-029-23119-00 & 50-029-23119-60 202-195 & 202-196 Rig Accept: 09/29/02 Rig Spud: 09/30/02 Rig Release: 10/16/02 Drilling Rig: Doyon 141 POST RIG WORK 11/13/02 RIH VERY SLOW, PULLED BALL & ROD @ 8145'WLM. PLAN TO ASSEMBLE EXTRA LUBRICATOR SECTION & EXTRA WEIGHT BAR TO RETRIEVE RHC IN AM. 11/14/02 USED PUMP TRUCK TO ASSIST IN WIRELlNE OPERATIONS, AS SHOWN ABOVE. PULLED RHC @ 8169'. PULLED RP SHEAR VALVE @ 2214', AND REPLACED W/ DGLV. SHIFTED SSD INTO OPEN POSITION, AND SET JET PUMP W/ 13B RATIO, #13 NOZZLE, AND #14 THROAT (SER#BP- 1071). FREEZE PROTECTED IA W/52 BBLS DIESEL. ) ~Od'- /95 / I 3~t WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 December 12, 2002 RE: MWD Formation Evaluation Logs MPS-29, AK-MW-22160 1 LIS formatted Disc with verification listing. API#: 50-029-23119-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Si~(~~ RECEIVED DEe 1 3 2002 Ala~'/2 "'1:' &' øt!.;g Vii {'J;",I' C'" . "'Q~ l\tI',,;. I " Vr ro;¡, wmmiss' AnChoraae iOn "",'" :'j '\ ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Ia Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. ~I"lær~j, 3. Address ~'.'J' P.O. Box 196612, Anchorage, Alaska 99519-6612 ,"~ 4. Location of well at surface r';';';,:';;';:"~;~:;7,~'"\\' :m. ~L,1<oJ 3270' NSL 340' WEL SEC. 12 T12N R10E UM ;: "'.",,d ì'.d ii ;;"''''''!<?'''''~''"'''''''''''''''Íi!f/ At top of productive i~terval' " .~ CJ\ TE l 4136' NSL, 3807' WEL, SEC. 01, T12N, R10E, UM (OB) i .1t2.~~P-4- 1 ~~~~~k~~~~13' WEL, SEC. 35, T13N, R10E, UM (OB) t:::~~:~:=J 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE= 66.6' ADL 025518 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 9-30-2002 10-9-2002 10-16-2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 12950 4313 FT 12950 4313 FT IBI Yes 0 No 22. Type Electric or Other Logs Run MWD, GR RES, GYRO, ABI/IFR 1 CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD 2011 92# H-40 28' 112' 4211 ~60 sx Arctic Set (Approx.) 7-5/811 29.7# L-80 281 9237' 9-7/811 1868 sx PF IL', 600 sx Class IGI (Top Job 49 sx PF 'Ll) 12950' 6-1/811 Uncemented Slotted Liner Classification of Service Well 7. Permit Number 202-195 8. API Number 50-029-23119-00 9. Unit or Lease Name Milne Point Unit 10. Well Number MPS-29 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) 4-1/211 12.7# L-80 9103' 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/211 Slotted Liner 25. SIZE 4-1/211, 12.6#, L-80 MD TVD TVD MD AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 8174' PACKER SET (MD) 8123' 9207' - 12948' 4187' - 4313' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 82 Bbls of Diesel Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. S~€~~i¥ t D 26. 27. Date First Production Not on Production Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL OIL-BBL GAs-McF WATER-BBL No core samples were taken. NO\! I Q . () QBDMS BFL Form 10-407 Rev. 07-01-80 CHOKE SIZE GAS-OIL RATIO OIL GRAVITY-API (CORR) NOV 1 4 2002 Alaska Oil & Gas Cons. Commission Anchorage Submit In Duplicate ') ') 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. SBF1-NB 7863' 4013' SBF1-NBR 7877' 4018' SBF12 7921' 4034' SBE4-NC 7944' 4043' SBE41 7961' 4049' SBE2-NE 7978' 4055' SBE1-NF 8115' 4105' Top of Schradder OA Sand 8202' 4131' TSBC 8533' 4159' Top of Schradder 08 Sand 8949' 4178' RECEIVED Top of Schradder OB Sand 12886' 4315' NOV 1 4 2002 31. List of Attachments: Alaska Oil & Gas Cons. Commission Anchor~go Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary. 32. I hereby certify that the Signed Date \ t - l~--O~ MPS-29 Well Number Permit No. / Approval No. Prepared By Name/Number: Sandra Stewman, 564-4750 Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: MPS-29 Common Name: MPS-29 Test Date 1 0/8/2002 Test Type FIT Test Depth (TMD) 9,278.0 (ft) BP EXPLORATION Leak-Off Test Summary Test Depth (TVD) 4,192.0 (ft) AMW 8.90 (ppg) Surface Pressure 540 (psi) Leak Off Pressure (BHP) 2,478 (psi) Page 1 of 1 EMW 11.38 (ppg) "'-,/ "'"-" Printed: 10/21/2002 8:49:21 AM ) t ') BP EXPLORATION Operations Summary Report Page 1 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 1 0/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 9/29/2002 14:00 - 19:30 5.50 MOB P PRE MOVE RIG FROM MPS-17, SPOT RIG OVER MPS-29 19:30 - 20:30 1.00 MOB P PRE SPOT ROCKWASHER, HOOK UP SERVICE LINES 20:30 - 00:00 3.50 MOB P PRE REPAIRING TOP DRIVE 9/30/2002 00:00 - 04:00 4.00 RIGU P PRE NIPPLE UP DIVERTER, TAKING ON WATER, MIXING SPUD MUD, LOAD PIPE SHED RIG ACCEPT @ 00:01 9/30/2002 04:00 - 05:00 1.00 RIGU P PRE CHANGE OUT TOP DRIVE SAVER SUB. 05:00 - 14:00 9.00 DRILL P INT1 PICKING UP DRILL PIPE AND STANDING IN DERRICK, TOTAL OF 297 JTS. OF 41N, 17 JTS 5 HWP, 3 FLRX COLLARS 14:00 - 15:00 1.00 DRILL P INT1 SLIP AND CUT DRILLING LINE 15:00 - 15:30 0.50 DRILL P INT1 SPUD MEETING 15:30 - 17:00 1.50 DRILL P INT1 PICKUP BHA BIT ,7" MOTOR 1.5 BEND, STAB,MWD,HANG OFF SUB,UBHO SUB,STAB, I STAND HWP 17:00 - 17:30 0.50 DRILL P INT1 FUNCTION TEST DIVERTER AND ACCUMULATOR WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK SCHEVE AOGCC 17:30 - 19:30 2.00 DRILL P INT1 SPUD WELL, DRILLING FROM 108 TO 270' GOT GOOD MWD SURVEY @ 168 FT SURVEY DEPTH 19:30 - 20:30 1.00 DRILL P INT1 RIG UP SLICK LINE RUN GYRO @ 178' SURVEY DEPTH 20:30 - 00:00 3.50 DRILL P INT1 DRILLING FROM 270' TO 813' WITH 70 RPM, 20/25K BIT WT. 360 GALS MIN. 900 PSI, TO 3,000 ART 2, AST 1.5 KICKED OFF @ 270 FT. 10/1/2002 00:00 - 16:30 16.50 DRILL P INT1 DRILLING FROM 813' TO 3213' - WOB 15K TO 20K - GPM 505 - PP ON 2520 - PP OFF 2400 - RPM 80 - TO ON 5K - TO OFF 3K - PU 78K - SO 62K - ROT 73K 16:30 - 17:30 1.00 DRILL P INT1 CIRC CONDITION HOLE FOR TRIP - 80 RPM'S - 500 GPM - PP 2400 17:30 - 20:00 2.50 DRILL P INT1 PUMP OUT OF HOLE @ 500 GPM TO 719' 20:00 - 22:00 2.00 DRILL P INT1 BHA - STAND BACK HWDP - FLEX DC'S - UD UBHO SUB - BREAK OFF BIT - ADJUST MOTOR TO 1.22 DEGREE - M/U BIT # 2 - ORIENT - RIH WITH FLEC DC'S 22:00 - 22:30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 22:30 - 23:00 0.50 DRILL P INT1 BHA - RIH WITH HWDP - JARS - PULSE TEST MWD 23:00 - 00:00 1.00 DRILL P INT1 CON'T RIH WITH DP TO 3213' 10/2/2002 00:00 - 01 :30 1.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3213' TO 3518' - WOB 20K- GPM 500 - PP ON 2550 - PP OFF 2450 - RPM 120 - TO ON 5K TO OFF 4K 01 :30 - 02:00 0.50 DRILL N SFAL INT1 MUD PUMP # 1 - CHECK SUCTION VALVES - TIGHTEN LINES 02:00 - 06:30 4.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3518' TO 4546' - WOB 25K TO 30K - GPM 500 - PP ON 3050 - PP OFF 2900 - RPM 120 - TO ON 7K - TO OFF 5K - PU 93K - SO 62K - ROT 77K 06:30 - 08:00 1.50 DRILL P INT1 CIRC FOR SHORT TRIP - 3 X BU - OBSERVE WELL 08:00 - 11 :00 3.00 DRILL P INT1 PULL OUT HOLE TO 3610' - SWABBING TIGHT - PUMP OUT FROM 3610' TO 720' - GPM 500 11 :00 - 11 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 11 :30 - 13:00 1.50 DRILL P INT1 RIH TO 4455' - WASH / REAM FROM 4455' TO 4546' 13:00 - 20:30 7.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4546' TO 5834' - WOB 25K TO 30K - GPM 500 - PP ON 3450 - PP OFF 3300 - RPM 120 - TO ON 10K - TO OFF 7K - PU 112K - SO 50K - ROT 82K 20:30 - 21 :30 1.00 DRILL N RREP INT1 SWIVEL PACKING - PULL STAND OUT OF HOLE - TIGHT - INSTALL CIRC HEAD PIN - CIRC HOLE WITH 30 STKS 107 Printed: 10/21/2002 8:51 :00 AM ') ) cJ:~ BP EXPLORATION Page 2 of? Operations Summary Report Legal Well Name: MPS-29 Common Well Name: M PS-29 Spud Date: 9/30/2002 Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 10/16/2002 Contractor Name: DOYON Rig Release: 10/16/2002 Rig Name: DOYON 141 Rig Number: 141 Date From - To Hours Task Code NPT Phase Description of Operations 1 0/2/2002 20:30 - 21 :30 1.00 DRILL N RREP INT1 GPM @ 500 PSI - CHANGE OUT SWIVEL PACKING - WASH BACK TO BTM 21 :30 - 00:00 2.50 DRILL P INT1 DIRECTIONAL DRILL FROM 5834' TO 6134' - WOB 25K TO 30K - GPM 500 - PP ON 3500 - PP OFF 3400 - RPM 120 - TQ ON 10K - TQ OFF 7K - PU 115K - SO 50K - ROT 78K 10/3/2002 00:00 - 08:30 8.50 DRILL P INT1 DIRECTIONAL DRILL FROM 6134' TO 7508' - WOB 25K TO 30K - RPM 120 - TQ ON 12K - TQ OFF 8K - GPM 500 - PP ON 3770 - PP OFF 3600 - PU 135K SO 50K - ROT 85K 08:30 - 11 :00 2.50 DRILL P INT1 CIRCULATE HOLE CLEAN 3 X BU - GPM 500 - RPM 120 - OBSERVE WELL - WELL STATIC 11 :00 - 17:30 6.50 DRILL P INT1 PUMP OUT OF HOLE TO 2200' - GPM 500 - CON'T PULL OUT HOLE TO BHA 17:30 - 21 :00 3.50 DRILL P INT1 STAND BACK 4 STANDS OF 5" HWDP - JARS - UD 6 JTS OF 5" HWDP - STAND BACK FLEX DC'S - BREAK BIT - M/U NEW BIT - (PRECAUCTIONARY BIT CHANGE FOR T.D. WELL) - DOWN LOAD MWD - UP LOAD MWD - RIH WITH FLEX DC'S - 5" HWDP - JARS - PULSE TEST MWD 21 :00 - 21 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE - BLOCKS 21 :30 - 00:00 2.50 DRILL P INT1 RIH WITH 5" DP TO 5830' - FILL PIPE 25 STDS AND 23 STANDS - (5000' TO 5830') STRING TAKING WEIGHT WORKING IN HOLE - FRICTION WT 10/4/2002 00:00 - 01 :30 1.50 DRILL P INT1 PUMPING / REAMING IN HOLE FROM 5830' TO 6813' - RIH FROM 6813' TO 6954' - PUMP IN HOLE FROM 6954' TO 7175' - RIH FROM 7175' TO 7361' - PUMP / REAM FROM 7361' TO 7508' 01 :30 - 18:30 17.00 DRILL P INT1 DIRECTIONAL DRILL FROM 7508' TO 9248' - T.D. 97/8" HOLE - WOB 15K TO 20K - RPM 120 - TQ ON 12K - TQ OFF 10K - GPM 480 - PP ON 4130 - PP OFF 4000 - PU 137K - SO 48K - ROT 86 18:30 - 00:00 5.50 DRILL P INT1 CIRCULATE HOLE CLEAN - 4 X BU - 35000 STKS - RPM 120 - GPM 480 - STAND ONE STAND BACK EVERY 4000 STROKES PUMPED - OBSERVE WELL - WELL STATIC 10/5/2002 00:00 - 01 :00 1.00 DRILL P INT1 PUMP OUT FROM 8425' TO 7500' - GPM 480 - NO PROBLEMS HOLE IN GOOD SHAPE 01 :00 - 05:00 4.00 DRILL P INT1 POOH FROM 8425' TO BHA @ 541' 05:00 - 06:30 1.50 DRILL P INT1 PULL BHA - DOWN LOAD MWD - UD MWD - BREAK BIT - UD MOTOR 06:30 - 07:30 1.00 DRILL P INT1 CUT DRLG LINE 07:30 - 08:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 08:00 - 09:00 1.00 DRILL P INT1 MAKE UP HOLE OPENER - RIH TO 1500' 09:00 - 13:00 4.00 DRILL P INT1 CONTROL REAM FROM 1500' TO 3466' @ 6 STANDS PER HOUR (INCLUDING CONNECTION TIME) - WOB 0 - RPM 150 - TQ 8K - 550 GPM - PP 1250 13:00 - 14:30 1.50 DRILL P INT1 RIH TO 7951' 14:30 -17:30 3.00 DRILL P INT1 CONTROL REAM FROM 7951' TO 9248' @ 6 STANDS PER HOUR (INCLUDING CONNECTION TIME) - WOB 0 TO 5K - RPM 150 - TQ 10K - PP 3000 - PU 135K - SO 51 K - ROT 88K 17:30 - 21 :30 4.00 CASE P INT1 CIRCULATE CONDITION HOLE AND MUD - GPM 550 - PP 3200 - RPM 150 - TQ 10K - SPOT LUB PILL @ BIT- OBSERVE WELL - WELL STATIC - PUMP DRY JOB 21 :30 - 00:00 2.50 CASE P INT1 POOH FROM 9248' TO 3000' - HOLE IN GOOD CONDITION 10/6/2002 00:00 - 01 :00 1.00 CASE P INT1 POH FROM 3000' TO BHA @ 477' 01 :00 - 02:30 1.50 CASE P INT1 BHA - LAY DOWN 5" HWDP - JARS - FLEX DC'S - Printed: 10/21/2002 8:51 :00 AM ') ) BP EXPLORATION Operations Summary Report Page 3 of? Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/6/2002 01 :00 - 02:30 1.50 CASE P INT1 STABILIZERS - HOLE OPENER 02:30 - 03:30 1.00 CASE P INn CHANGE SAVOR SUB TO 4 1/2 IF 03:30 - 05:00 1.50 CASE P INT1 RIG UP CASING TOOLS TO RUN 7 5/8" CASING - PJSM 05:00 - 13:30 8.50 CASE P INT1 PICK UP AND RUN 225 JTS OF HYDRIL 521 7 5/8" 29 # CASING + XO JOINTS - (TOTAL 9209' RAN) - LANDED WITH 50K ON WEIGHT INDICATOR - BLOCK WEIGHT 35K -15K CASING WEIGHT LEFT - SHOE 9237' - FLOAT COLLAR 9150' - NO CIRCULATION REQUIRED - NO BRIDGES- HOLE IN EXCELLENT SHAPE 13:30 - 18:00 4.50 CASE P INT1 CIRCULATE AND CONDITION MUD / HOLE FOR CEMENT JOB - 8 BPM - 500 PSI 18:00 - 23:00 5.00 CASE P INT1 PUMP 10 BBLS WATER - TEST LINES TO 3500 PSI- PUMP 40 BBLS WATER @ 7 BPM - 500 PSI- PUMP 47 BBLS SPACER 10.2 PPG - DROP BOTTOM PLUG - PUMP 3 BBLS SPACER - @ 6.5 BPM - 450 PSI - PUMP TOTAL 1351 BBLS LEAD CEMENT @ 5.5 BPM - 1150 BBLS BACK STARTED GETTING RED DYE - 1300 BBLS LOST RETURNS - PUMPED ADDITIONAL 51 BBLS LEAD CEMENT NO RETURNS - SWITCHED TO TAIL CEMENT - PUMPED 123 BBLS OF 15.8 TAIL @ 4 BPM - DROP TOP PLUG- DISPLACE WITH 30 BBLS WATER HOWCO - TURN OVER TO RIG - NO RETURNS 23:00 - 00:00 1.00 CASE P INT1 DISPLACE CEMENT @ 5.5 BPM WITH RIG PUMP 10/7/2002 00:00 - 00:30 0.50 CASE P INT1 CON'T DISPLACE CEMENT @ 5.5 BPM - BUMPED PLUG WITH 4668 STKS - 392 BBLS - WITH 2400 PSI - HELD FOR 3 MINS - BLEED OFF PRESSURE - FLOATS HELD - PUMP EFF 94% - NO CEMENT TO SURFACE 00:30 - 01 :30 1.00 CASE P INT1 DRAIN / FLUSH DIVERTOR RISER - LAY DOWN LANDING JOINT - RIG DOWN CASING TOOLS 01 :30 - 03:00 1.50 CASE P INT1 NIPPLE DOWN DIVERTOR 03:00 - 04:00 1.00 CASE P INT1 CHANGE OUT TOP DRIVE SAVOR SUB TO 4" 04:00 - 05:30 1.50 CASE P INT1 RIG UP FOR TOP JOB - RUN 1" IN TO 115' - SOLID - WORK 1 " DOWN 3' - PULL 1" PLUGGED WITH GREEN CEMENT - CLEAN 1" - RUN IN HOLE 110' - BREAK CIRC - PUMP 34 BBLS OF LEAD AT 10.7 PPG - 3 BBLS CEMENT BACK - WASH UP / CLEAN CELLAR 05:30 - 06:30 1.00 CASE P INT1 ORIENT - NIPPLE UP WELL HEAD - (FMC GEN 6 5K) - TEST FOR 10 MINS @ 1000 PSI 06:30 - 08:00 1.50 CASE P INT1 NU BOP'S 08:00 - 11 :30 3.50 CASE P INT1 PU 120 JOINTS 4" DRILL PIPE - CIRC DRILL PIPE CLEAN 11 :30 - 12:00 0.50 CASE P INT1 POOH WITH 4" DRILL PIPE 12:00 - 17:00 5.00 BOPSURP INT1 RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250 LOW 5 MINS - 2500 HIGH 5 MINS - PIPE RAMS - BLIND RAMS - CHOKE MANIFOLD - HYD KILL - HYD CHOKE - MANUAL KILL - MANUAL CHOKE - UPPER / LOWER IBOP - FLOOR SAFETY VALVES - 250 LOW 5 MINS - 4000 HIGH 5 MINS ALL TEST WERE GOOD - ACCUMULATOR TEST - 3000/1900 - 38 SEC FOR 200 PSI - 3 MINS 45 SECS TO 3000 PSI- 5 BOTTLES 2100 PSI AVG 17:00 - 17:30 0.50 BOPSUR P INT1 RIG DOWN TESTING EQUIPMENT -INSTALL WEAR RING 17:30 - 19:00 1.50 CASE P INT1 PU BHA - SCRIBE - UP LOAD MWD - PULSE TEST MWD - 19:00 - 22:30 3.50 CASE P INT1 RIH TO 9141' 22:30 - 23:30 1.00 CASE P INT1 BREAK CIRC - TEST CASING TO 4000 PSI FOR 30 MINS Printed: 10/21/2002 8:51 :00 AM ) ') / BP EXPLORATION Operations Summary Report Page 4 of? Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/7/2002 22:30 - 23:30 1.00 CASE P INn RECORDED ON CHART 23:30 - 00:00 0.50 CASE P INT1 TAG UP ON PLUG 9149' - DRILL PLUG FLOAT COLLAR 9150' - FIRM CEMENT TO 9235' 10/8/2002 00:00 - 00:30 0.50 CASE P INT1 DRILL SHOE @ 9236' - 30' NEW HOLE @ 9278' 00:30 - 01 :30 1.00 CASE P INT1 CIRC BTMS UP - BALANCE MUD WT TO 8.9 PPG - FOR FIT 01 :30 - 02:00 0.50 CASE P INT1 FIT - 540 PSI - 8.9 PPG - 4192 TVD = 11.38 PPG EMW 02:00 - 03:00 1.00 CASE P INT1 DISPLACE OLD 8.9 PPG SPUD MUD WITH NEW 9.1 PPG FLOPRO 03:00 - 00:00 21.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 9278' TO 11350' - WOB 3K TO 13K - RPM 100 - TO ON 7K - TO OFF 6K - GPM 250 - PP ON 2350 - PP OFF 2000 - PU 1 OOK - SO 50K - ROT 82K 10/9/2002 00:00 - 15:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 11350' TO 12950' - T.D. OB LATERAL - WOB 3K TO 13K - RPM 100 - TO ON 7K - TO OFF 6K - GPM 250 - PP ON 2450 - PP OFF 2200 - PU 120 - SO 52 - ROT 84 15:00 - 18:00 3.00 CASE P COMP CIRCULATE CLEAN UP HOLE - CBU 3 X - RPM-100 - GPM 250 - PP 2150 - PUMP LUB PILL 18:00 - 21 :30 3.50 CASE P COMP PUMP OUT FROM 12855' TO 9350' - GPM 250 - HOLE IN GOOD SHAPE 21 :30 - 00:00 2.50 CASE P COMP POOH @ 1200' 10/10/2002 00:00 - 01 :00 1.00 CASE P COMP CON'T POOH - (BHA) STAND BACK FLEX DC'S - JARS- HWDP - LAY DOWN MWD - BREAK BIT - LAY DOWN MOTOR 01 :00 - 01 :30 0.50 CASE P COMP RIG UP CASING TOOLS - (PJSM ON PICKING UP LINER) 01 :30 - 04:00 2.50 CASE P COMP PICK UP 90 JOINTS 4.5" L-80 12.6# SLOTTED LINER - 2 JOINTS 4.5" L-80 12.6# BLANK LINER - BAKER 5.5" X 7 5/8" HMC LINER HANGER - BAKER 5.5" X 7 5/8" ZXP LINER TOP PACKER - BAKER 7" TIE BACK SLEEVE - BAKER RUNNING TOOL 04:00 - 07:00 3.00 CASE P COMP CON'T RIH WITH LINER ON 4" DRILL PIPE to 12950' 07:00 - 10:00 3.00 CASE N DPRB COMP DROPPED 29/32" BALL AND CIRCULATED DOWN AT 4 BPM. NO PRESSURE INCREASE. WORKED PIPE AND CONTINUED CIRCULATING AT VARIOUS RATE. NO SUCCESS. DROPPED SECOND 29/32" BALL AND DISPLACED DOWN AT 3 BPM. DID NOT BUMP. 10:00 - 10:30 0.50 CASE P COMP DROP 1 3/4" BALL - HANG LINER - SET PACKER - RELEASE FROM LINER 10:30 - 14:00 3.50 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH WITH LINER RUNNING TOOL - LAY DOWN RUNNING TOOL 14:00 - 17:30 3.50 STWHIP P PROD2 PJSM - MAKE UP BAKER WHIPSTOCK ASSY - WITH MWD - ORIENT MWD WITH WHIPSTOCK - PICK UP SINGLE DP - 12 DC'S - 17 HWDP - PULSE TEST MWD 17:30 - 21 :30 4.00 STWHIP P PROD2 TIH WITH WHIPSTOCK TO 8700' (RUNNING SPEED 2 MINS PER STD) 21 :30 - 22:30 1.00 STWHIP P PROD2 CUT DRILLING LINE - RIG SERVICE 22:30 - 23:00 0.50 STWHIP P PROD2 RIH WITH WHIPSTOCK @ 8780' - ORIENT TO HIGH SIDE 23:00 - 23:30 0.50 STWHIP P PROD2 SET BTM ANCHOR - SHEAR OFF DISCONNET WITH 40K DOWN WEIGHT 23:30 - 00:00 0.50 STWHIP P PROD2 MILLING WINDOW - TOP 8842' TO 8844' - WOM 4K - RPM 80 - TO ON 4K - TO OFF 3K - GPM 261 - PP 1300 - PU 108 - SO 74 10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 MILLING WINDOW FROM 8844' TO 8869' (TOP OF WINDOW Printed: 10/21/2002 8:51 :00 AM ') ') BP EXPLORATION Operations Summary Report Page 5 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 8842' BOTTOM WINDOW 8854') - WOM 3K TO 5K - GPM 261 - PP 1350 - RPM 80 - TO ON 4K - TO OFF 3K 04:00 - 05:00 1.00STWHIP P PROD2 CIRCULATE HI VIS SWEEP - OBSERVE WELL - PUMP DRY JOB - WORK MILLS THROUGH WINDOW - NO DRAG OR OVERPULLS 05:00 - 08:00 3.00 STWHIP P PROD2 POOH WITH MILLING ASSY. MILL IN GOOD SHAPE AND IN GAUGE 08:00 - 08:30 0.50 STWHIP P PROD2 FLUSH BOP STACK OF METAL CUTTINGS. FUNCTIONED RAMS AND FLUSHED AGAIN 08:30 - 10:30 2.00 STWHIP P PROD2 CHANGED PULSER IN MWD. PICKED UP MOTOR SET AT 1.5 DEGREE AND OREINTED. MADE UP 6-1/8" SECURITY RERUN FM2643 PDC BIT. UNLOADED MWD 10:30 - 13:30 3.00 STWHIP P PROD2 TRIPPED IN HOLE WITH DRILLING ASSEMBLY FILLING DRILL PIPE EVERY 30 STANDS TO 8770'. BROKE CIRCULATION AND ORIENTED MOTOR TO HIGH SIDE. SHUT DOWN PUMP AND TRIPPED THROUGH WINDOW WITH NO PROBLEMS. TAGGED BOTTOM AT 8869' 13:30 - 00:00 10.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 8869' TO 9575' - WOB 3K to 9K - RPM 100 - TO ON 6K - TO OFF 5K - GPM 250 - PP ON 1600 - PP OFF 1550 - PU 110K - SO 73K - ROT 92K - (BASE OF OA 9302 - START OF SAND) 10/12/2002 00:00 - 00:00 24.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 9575' TO 12250' - WOB 3K TO 15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON 2430 - PP OFF 2180 - PU 118K - SO 40K - ROT 83K 10/13/2002 00:00 - 07:00 7.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 12250' TO 12950' - WOB 3K TO 15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON 2450 - PP OFF 2100 - PU 117 - SO 40 - ROT 80 07:00 - 12:00 5.00 CASE P COMP CIRCULATE 4 X - RAISE LUBRICANTS TO 5% IN SYSTEM 12:00 - 16:00 4.00 CASE P COMP PUMP OUT FROM 12950' TO 8870' - PULL TROUGH LINER FROM 8870' TO 8800' WITH OUT PUMP - NO PROBLEMS 16:00 - 19:00 3.00 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH TO BHA 19:00 - 20:30 1.50 CASE P COMP STAND FLEX DC'S BACK - DOWN LOAD MWD - FLUSH MOTOR - RE-CONF MOTOR - BREAK OFF BIT - LAY DOWN MOTOR 20:30 - 21 :30 1.00 CASE P COMP PICK UP BAKER WHIPSTOCK RETRIEVING ASSEMBLY - RIH WITH DC'S / HWDP - PULSE TEST MWD 21 :30 - 00:00 2.50 CASE P COMP RIH WITH WHIPSTOCK RETRIEVING TOOL TO 8170' - FILL PIPE EVERY 30 STANDS 10/14/2002 00:00 - 00:30 0.50 CASE P COMP CON'T RIH TO 8774'- WITH RETREIVING TOOLS 00:30 - 01 :00 0.50 CASE P COMP ORIENT TOOL TO HIGH SIDE - RIH TO 8842' - LATCH ONTO WHIPSTOCK - PULL TO 165K - OBSERVE WELL- WELL STATIC - PULL 5 STANDS - PUMP DRY JOB 01 :00 - 04:00 3.00 CASE P COMP POOH TO BHA 04:00 - 06:00 2.00 CASE P COMP LAY DOWN MWD - BAKER RETRIEVING ASSY - LAY DOWN WHIPSTOCK - LAY DOWN RETRIEVING TOOLS 06:00 - 06:30 0.50 CASE P COMP RIG UP CASING TOOLS - PJSM 06:30 - 10:00 3.50 CASE P COMP PICK UP 89 JTS 4.5" 12.6# L-80 SLOTTED LINER - 13 JTS 4.5" 12.6# L-80 SOLID LINER - (TOTAL RUN 102 JTS)(TOTAL FOOTAGE RUN 4091') - BAKER HOOK WALL HANGER WITH 6' TIE BACK SLEEVE - 10:00 - 14:30 4.50 CASE P COMP RIH WITH LINER ON 4" DP TO 12911' - RAN 13 STANDS OF 4.75" DC'S /3.5" HWDP 15 STANDS FROM SURFACE FOR Printed: 10/21/2002 8:51:00AM ') ') BP EXPLORATION Operations Summary Report Page 6 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/14/2002 10:00 - 14:30 4.50 CASE P COMP ADDITIONAL WEIGHT - LINER WENT TO BTM WITHOUT ORIENTION AT WINDOW - HOOK LINER 1ST ATTEMPT ON WINDOW 14:30 - 16:00 1.50 CASE P COMP PUMP BALL TO SEAT - PRESSURE UP TO 2700 PSI- RELEASE BAKER HR SETTING TOOL - BLEED PRESSURE TO 0 - VERIFY RELEASE WITH 6' PICK UP - BLOW BALL SEAT - OPEN CIRC SUB WITH 3700 PSI 16:00 - 16:30 0.50 CASE P COMP POOH 60' - CBU - OBSERVE WELL - WELL STATIC - PUMP DRY JOB 16:30 - 17:30 1.00 CASE P COMP POH - STAND BACK 41 STANDS DRILL PIPE 17:30 - 22:30 5.00 CASE P COMP POH LAYING DOWN 4" DRILL PIPE - (132 JTS) -15 4.75" DC'S - 15 JTS HWDP 3.5" - LAY DOWN LINER RUNNING TOOL - (TOTAL STANDS IN DERRICK 95 - TOTAL FOOTAGE 8876') 22:30 - 23:00 0.50 BOPSUR P COMP PULL WEAR RING 23:00 - 00:00 1.00 BOPSUR P COMP RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250 LOW 5 MINS - 2500 HIGH 5 MINS - ALL OTHER TEST 250 LOW 5 MINS - 4000 HIGH 5 MINS - UPPER IBOP - LOWER IBOP - FLOOR SAFETY VALVES 10/15/2002 00:00 - 02:30 2.50 BOPSUR P COMP TEST BOPS - PIPE RAMS - BLIND RAMS - CHOKE MANIFOLD - HYD VALVE ON CHOKE - HYD VALVE ON KILL - MANUAL VALVE ON CHOKE - MANUAL VALVE ON KILL- ALL TEST WERE GOOD - TEST PRESSURE 250 LOW 5 MINS - 4000 HIGH 5 MINS - (JEFF JONES WITH AOGCC WITNESSED THE BOP TEST) 02:30 - 03:00 0.50 BOPSUR P COMP RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG - INSTALL WEAR RING 03:00 - 06:00 3.00 RUNCOrvP COMP MAKE UP 3.5" MULE SHOE - RIH 06:00 - 07:30 1.50 RUNCOrvP COMP CUT DRILL LINE AND SERVICED TOP DRIVE 07:30 - 11 :00 3.50 RUNCOrvP COMP DISPLACED MUD IN HOLE WITH 600 BBLS OF 8.8 #/GAL OF NACL AND FOLLOWED WITH 450 BBLS OF 9.2 #/GAL NACL. PUMPED 120 SPM AND ROTATED PIPE AT 120 RPM WORKED PIPE FULL STAND. 9.2 BRINE PREHEATED TO 120 DEGREES BEFORE DISPLACEMENT 11 :00 - 18:30 7.50 RUNCOrvP COMP LAYING DOWN DRILL PIPE, PULL WEAR RING, HOLE TAKING 9.2 BRINE AT THE RATE OF 4 BBLS HR. 18:30 - 19:00 0.50 RUNCOrvP COMP PJSM, RIG UP TO RUN TUBING 19:00 - 00:00 5.00 RUNCOrvP COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP COMPLETION TOTAL JTS RUN 55 JTS 2300 FT RUNNING TUBING AT A SLOWER PACE THE NORMAL, WITH THE HOLE TAKING BRINE. LOST TOTAL OF 40 BBLS OF BRINE TO WELL 10/16/2002 00:00 - 07:00 7.00 RUNCOrvP COMP PICKING UP 4.5 12.6# L-80 IBT TUBING AND JET PUMP COMPLETION TOTAL JTS RUN 196 JTS P/U WT 92K S/O WT 65K 07:00 - 08:00 1.00 RUNCOrvP COMP PICK UP HANGER AND TIE IN 1- WIRE, LAND TUBING, PACKER DEPTH 8123, GLM DEPTH 2214, XN NIPPLE 8168, JET PUMP SENSOR 8095, SLIDING SLEEVE 8076, PRESSURE GAUGE 8055 08:00 - 08:30 0.50 RIGD P COMP TEST TWC TO 1000 PSI 08:30 - 10:00 1.50 RIGD P COMP CHANGE RAMS TO 5" NIPPLE DOWN BOPS 10:00 - 11 :30 1.50 RIGD P COMP NIPPLE UP ADAPTER FLANGE, TEST ADAPTER FLANGE TO 5,000 PSI Printed: 10/21/2002 8:51:00 AM ') ') BP EXPLORATION Operations Summary Report Page 7 of 7 Legal Well Name: MPS-29 Common Well Name: MPS-29 Spud Date: 9/30/2002 Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 10/16/2002 Contractor Name: DOYON Rig Release: 10/16/2002 Rig Name: DOYON 141 Rig Number: 141 Date From - To Hours Task Code NPT Phase Description of Operations 10/16/2002 11 :30 - 12:30 1.00 RIGD P COMP NIPPLE UP 41/16 CIW TREE AND TEST TO 5,000 PSI 12:30 - 13:00 0.50 RIGD P COMP PULL TWC WITH LUBRICATOR 13:00 - 17:30 4.50 RIGD P COMP RIG UP HB&R CIRC 9.3 BRINE AND WARM TO 100 DEGREES 17:30 - 18:30 1.00 RIGD P COMP DROP BALL, PRESSURE UP TO 4,000 PSI TO SET PACKER AND TEST TUBING, RECORD FOR 30 MIN. 18:30 - 19:30 1.00 RIGD P COMP BLEED PRESSURE IN TUBING TO 3,000 PSI AND PRESSURE ANNULUS TO 4,500 PSI, RECORDED FOR 30 MIN. 19:30 - 20:30 1.00 RIGD P COMP BLEED TUBING PRESS TO 2,000 AND SHEARED RP VALVE, PUMP 82 BBLS OF DIESEL DOWN ANNLUS TO FREEZE PROTECT WELL 20:30 - 22:00 1.50 RIGD P COMP LET DIESEL U-TUBE IN TO TUBING 22:00 - 22:30 0.50 RIGD P COMP RIG UP LUBRICATOR AND SET BPV 22:30 - 00:00 1.50 RIGD P COMP SECURE TREE, CLEAN CELLAR AND PITS RIG RELEASE TO MOVE TO MPS-19 @ 24:0010/16/2002 Printed: 10/21/2002 8:51:00AM ') AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ) Re: Distribution of Survey Data for Well MPS-29 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD 0.00' M D (if applicable) 12,950.00' MD 31-0ct-02 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) aOd-J9s RECE IVE'r",~ r~~ ,~., !L.,;;/I UOv 0 7 .:': .. t;.....", t-Jf:.~~k~ ......., <J ~"""'~..J \.l~, J; " ~: .:,-~.-';j.Y:"-! , ''''''<;~¡i~~7I Sperry-Sun ørllling Services Milne)(Po/".t Unit 8". Miln ~. .t MPS 8Þ6".29 Job No. AK%Z221BQ, ", Survfþyect: 9 October, 2002 S~!;.eport 28 ".,2002 Your Ref: API 600292311900 Surface Coordinates: 5999936.18 H, 5fiØ"70.94E (70° 24' 36.9759" H, 1490 27' 54.9398" W) Grid Coordinate System:NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to P'9J~H R..rence: 999936.18 N, 65670.94 E (Grid) Surface Coordlnates"./a.. ure: 32.89 S, 674.38 W(True) Kelly Bushing' Mean Sea Level Elevation ~" VReference: 66.60ft Elevatlon ' cture: 66.6Oft ~'" 'é!"." '~~" ;f,'_,r." ,9".'~IJ,"¿, !'8,-,.."", ,1M -....., ' "'",", ,- ' " . £;I ,A' ~L;t.~'-'-~"'V I c:'e s A Halliburton Company DEF \JI T VE ---' --- Survey Ref: svy10205 Sperry-Sun Drilling Services Survey Report for MIlne Point MPS - MPS-29 Your Ref: API5OD292311900 Job No. AKZZ22160, surveyed: 9 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Verti~1 Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 0.00 0.000 0.000 -66.60 0.00 O.OON O.OOE 5999936.18 N 565670.94 E 0.00 AK-1 BP _HG 178.00 0,080 44.900 111 .40 178.00 0.09N 0.09E 5999936.27 N 565671.03 E 0.045 0.08 AK-6 BP _IFR-AK 295.39 2,130 324.300 228.76 295.36 1.92 N 1.13W 5999938.09 N 565669.80 E 1.805 2.04 384.23 4.110 327.180 317.47 384.07 5.93N 3.82W 5999942.08 N 565667.07 E 2.235 6.34 472,94 5.770 326.360 405.84 472.44 12.32 N 8.01 W 5999948.43 N 565662.82 E 1.873 13.17 563.49 7,100 324.770 495.82 562.42 20.68 N 13.76 W 5999956.74 N 565657.00 E 1.482 22.14 --/ 655.62 7.920 325.760 587.16 653.76 30.58 N 20.62 W 5999966.58 N 565650.06 E 0.901 32.77 750,33 11,590 328.340 680.49 747.09 44.08N 29.28 W 5999980.00 N 565641.27 E 3.901 47.18 843,52 13,910 328.000 771.37 837.97 61.54 N 40.14 W 5999997.37 N 565630.27 E 2.491 65.80 936,53 16,360 328.880 861.15 927.75 82.24 N 52.83 W 6000017.96 N 565617 .39 E 2.646 87.83 1029,34 17,670 328.870 949.89 1016.49 105.49 N 66.87 W 6000041.08N 565603.15 E 1.411 112.55 1123.93 18.900 326.850 1039.71 1106.31 130.61 N 82.67 W 6000066.05 N 565587.13 E 1 .463 139.34 1216.21 21,520 327.180 1126.30 1192.90 157.35 N 100.02W 6000092.64 N 565569.54 E 2.842 167.91 1310,11 26.160 326.830 1212.16 1278.76 189.17 N 120.69W 6000124.28 N 565548.59 E 4.944 201.92 1403,93 28.300 326.210 1295.58 1362.18 224.96 N 144.38 W 6000159.87 N 565524.59 E 2.301 240.23 1497.45 31.110 324.580 1376.80 1443.40 263.08 N 170.71 W 6000197.75 N 565497.92 E 3.126 281.16 1591.80 32,390 324.110 1457.03 1523.63 303.42 N 199.66 W 6000237.84 N 565468.62 E 1.382 324.59 1685.03 34.100 325.020 1535.00 1601.60 345.07 N 229.28 W 6000279.22 N 565438.64 E 1.911 369.40 1778.08 34.760 324,100 1611.75 1678.35 387.93 N 259.79 W 6000321.81 N 565407.75 E 0.903 415.51 1871.59 37.400 324,190 1687.32 1753.92 432.56 N 292.04 W 6000366.15 N 565375.11 E 2.824 463.59 1963.61 38,880 324.690 1759.69 1826.29 478.79 N 325.08 W 6000412.09 N 565341.66 E 1.643 513.36 2058.24 42.150 326.270 1831.63 1898.23 529.45 N 359.89 W 6000462.44 N 565306.41 E 3.622 567.72 2151.67 43.210 329.020 1900.32 1966.92 582.95 N 393.77 W 6000515.64 N 565272.06 E 2.295 624.80 2245,02 44.000 327.920 1967.91 2034.51 637.82 N 427.44 W 6000570.22 N 565237.91 E 1.173 683.21 2338.49 47.420 326.730 2033.17 2099.77 694.12 N 463.57 W 6000626.20 N 565201.28 E 3.771 743.33 2431 ,Tt 52.380 327,240 2093.24 2159.84 753.94 N 502.42 W 6000685.67 N 565161.91 E 5.334 807.26 2524,87 58.610 329.750 2145.96 2212.56 819.34 N 542.44 W 6000750.72 N 565121.32 E 7.050 876.88 2618,05 ö5,170 331.780 2189.84 2256.44 891.04 N 582.52 W 6000822.06 N 565080.61 E 7.297 952.75 2711,96 66.510 332.400 2228.28 2294.88 966.76 N 622.62W 6000897.42 N 565039.84 E 1.549 1032.62 2805.42 64,950 332.600 2266.69 2333.29 1042.33 N 661.96W 6000972.65 N 564999.84 E 1.681 1112.25 2898,99 ö7,190 331 .270 2304.64 2371.24 1117.78 N 702.20 W 6001047.75 N 564958.94 E 2.724 1191.88 2992,23 l2,640 331.530 2336.65 2403.25 1194.64 N 744.10W 6001124.23 N 564916.36 E 5.851 1273,09 3085.49 /3.140 330.790 2364.09 2430.69 1272.72 N 787.10 W 6001201.93 N 564872.68 E 0.929 1355.64 3175,56 70,240 331.640 2392.38 2458.98 1347.65 N 828.27W 6001276.50 N 564830.85 E 3.342 1434.85 3268.62 69)170 332,090 2424.66 2491.26 1424.62 N 869.43W 6001353.10 N 564789.02 E 1.236 1516.08 28 October, 2002 - 15:14 ~age 20f8 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29 Your Ref: API 500292311900 Job No. AKZZ2216D, Surveyed: 9 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth, Northings eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3362.37 69,420 331.750 2457.81 2524.41 1501.99 N 910.71 W 6001430.10 N 564747.06 E 0,432 1597.73 3455.52 68,970 332.030 2490.89 2557.49 1578.79 N 951.74 W 6001506.55 N 564705.36 E 0.559 1678.79 3549,02 68,380 332.150 2524.89 2591.49 .. 1655.76 N 992.50 W 6001583.15 N 564663.91 E 0.642 1759.97 3642.36 72,060 329.170 2556,48 2623.08 1732.29 N 1035.55 W 6001659.30 N 564620.20 E 4.956 1840.99 3735.47 74,170 328.650 2583.52 2650.12 1808.58 N 1081.56 W 6001735.18 N 564573.52 E 2.328 1922.12 3828,71 71,320 328.170 2611.18 2677.78 1884.43 N 1128.20W 6001810.61 N 564526.22 E 3.096 2002.87 ~' 3922.26 "12.620 327.890 2640.13 2706.73 1959.89 N 1175.30 W 6001885.66 N 564478.46 E 1.418 2083.30 4016.54 72,040 328.590 2668.75 2735.35 2036.27 N 1222.58 W 6001961.62 N 564430.50 E 0.938 2164.66 4110.04 72.750 328.570 2697.03 2763.63 2112.32 N 1269.04 W 6002037.26 N 564383.38 E 0.760 2245.60 4204.02 70.540 328.110 2726.62 2793.22 2188.24 N 1315.85 W 6002112.76 N 564335.90 E 2.397 2326.45 4297.17 69.990 328.260 2758.08 2824.68 2262.74 N 1362.07 W 6002186.86 N 564289.02 E 0.610 2405.83 4390.03 70.340 328.610 2789.59 2856.19 2337.17 N 1407.80 W 6002260.88 N 564242.65 E 0.517 2485.07 4480.89 69.500 328.580 2820.78 2887.38 2410.01 N 1452.27 W 6002333.32 N 564197.54 E 0.925 2562.58 4577.70 67,180 329.560 2856.51 2923.11 2487.18 N 1498.51 W 6002410.08 N 564150.61 E 2.574 2644.60 4670,64 70.140 329.950 2890.33 2956.93 2561.95 N 1542.11 W 6002484.48 N 564106.36 E 3.209 2723.95 4764.09 71 . 1 90 330.260 2921.27 2987.87 2638.40 N 1586.06 W 6002560.53 N 564061.74 E 1.166 2804.98 4857.47 71 .530 330.640 2951.11 3017.71 2715.37 N 1629.70 W 6002637.12 N 564017.43 E 0.530 2886.51 4950.94 71,650 330.870 2980.63 3047.23 2792.75 N 1673.02 W 6002714.12 N 563973.43 E 0.266 2968.41 5044,12 71.410 330.680 3010.15 3076.75 2869.88 N 1716.17 W 6002790.86 N 563929.60 E 0.322 3050.03 5137.90 71,730 330.340 3039.80 3106.40 2947.33 N 1759.97 W 6002867.92 N 563885.12 E 0.484 3132.05 5231.49 '71,840 330.250 3069.06 3135.66 3024.54 N 1804.02 W 6002944.75 N 563840.39 E 0.149 3213.86 5324,61 '70.400 331.330 3099.19 3165.79 3101.44 N 1847.02 W 6003021.26 N 563796.72 E 1.896 3295.24 541l.11 70.140 331.350 3130.64 3197.24 3178.39 N 1889.08W 6003097.84 N 563753.98 E 0.280 3376.56 69,920 330.850 3162.60 3229.20 3255.39 N 1931.59W 6003174.46 N 563710.80 E 0.554 ~~"" 5511.35 3457.98 5604,68 70.870 331.490 3193.91 3260.51 3332.41 N 1973.98W 6003251.11 N 563667.73 E 1.206 3539.41 5698,53 '71.280 331.060 3224.35 3290.95 3410.26 N 2016.65 W 6003328.58 N 563624.38 E 0.615 3621.70 5791.90 71,350 330.260 3254.27 3320.87 3487.37 N 2059.99 W 6003405.30 N 563580.37 E 0.815 3703.32 5885.42 '71,590 329.240 3283.99 3350.59 3563.96 N 2104.66 W 6003481.50 N 563535.03 E 1.065 3784.59 5978.90 71.850 328.430 3313.31 3379.91 3639.91 N 2150.59 W 6003557.04 N 563488.43 E 0.869 3865,37 6072,Ol (i9.580 329.670 3344.08 3410.68 3715.32 N 2195.82 W 6003632.05 N 563442.54 E 2.741 3945.53 6165,54 68.930 329.280 3377.19 3443.79 3790.62 N 2240.22 W 6003706.96 N 563397.48 E 0.797 4025.48 6258.84 69,000 329.020 3410.68 3477.28 3865.38 N 2284.87 W 6003781.32 N 563352.17 E 0.271 4104,93 6352,21 69,960 328.320 3443.41 3510.01 3940.07 N 2330.34 W 6003855.61 N 563306.04 E 1.245 4184.40 6445,88 71 ,090 328.240 3474.63 3541.23 4015.19 N 2376.17 W 6003930.32 N 563258.95 E 1.209 4264.41 6539,20 72 .ß90 328.260 3503,64 3570.24 , 4090.61 N 2423.45 W 6004005.33 N 563211.62 E 1.715 4344.75 28 October, 2002 - 15:14 Page 3 of 8. DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for MIlne PoInt MPS - MPS-29 Your Ref: API 500292311900 Job No. AKZZ2216Ø, Surveyed: 9 October, 2002 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth. Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOtt) 6632.4 1 71 ,130 329.260 3532.58 3599.18 4166.36 N 2469.40 W 6004080.67 N 563165.00 E 1.960 4425.33 6726.06 69.640 329.590 3564.02 3630.62 4242.31 N 2514.27 W 6004156.22 N 563119.47 E 1.625 4505.98 6819.22 69210 329.520 3596.76 3663.36 .. 4317.50 N 2558.46 W 6004231.02 N 563074.61 E 0.467 4585.80 6912.45 70.400 329.460 3628.94 3695.54 4392.88 N 2602.88 W 6004306.01 N 563029.53 E 1278 4665.84 7006.23 69.690 329.840 3660.95 3727.55 4468.95 N 2647.42 W 6004381.68 N 562984.32 E 0.847 4746.57 7097.96 69.910 329.790 3692.62 3759.22 4543.37 N 2690.71 W 6004455.71 N 562940.39 E 0245 4825.52 ~ 7189.84 70.440 329.670 3723.78 3790.38 4618.02 N 2734.28 W 6004529.98 N 562896.16 E 0.590 4904.73 7286.43 69.820 332.120 3756.62 3823.22 4697.38 N 2778.46 W 6004608.95 N 562851.28 E 2.470 4988.69 7379,75 70.520 332.610 3788.28 3854.88 4775.15 N 2819.18 W 6004686.36 N 562809.88 E 0.898 5070.67 7482.64 72.030 332.250 3821.30 3887.90 4861.52 N 2864.28 W 6004772.33 N 562764.02 E 1.505 5161.71 7575.89 71.010 335.040 3850.87 3917.47 4940.76 N 2903.54 W 6004851.22 N 562724.07 E 3.041 5244.97 7668.53 70.580 335.150 3881.34 3947.94 5020.11 N 2940.38 W 6004930.24 N 562686.53 E 0.478 5328.07 7762.44 70.740 335.200 3912.44 3979.04 5100.53 N 2977.59 W 6005010.33 N 562648.62 E 0.178 5412.27 7855.75 69.390 335.390 3944.26 4010.86 5180.22 N 3014.25 W 6005089.70 N 562611.26 E 1.459 5495.68 7949.49 68.540 334.650 3977.90 4044.50 5259.53 N 3051.20 W 6005168.68 N 562573.62 E 1.168 5578.75 8043.49 67.640 334.240 4012.98 4079.58 5338.21 N 3088.81 W 6005247.02 N 562535.31 E 1.039 566127 8137,17 69.920 333.290 4046.88 4113.48 5416.53 N 3127.42 W 6005325.00 N 562496.01 E 2.611 5743.55 8230,07 78.470 332.890 4072.16 4138.76 5496.16 N 3167.84 W 6005404.27 N 562454.89 E 9.213 5827.35 8276.37 82.100 332.800 4079.98 4146.58 5536.76 N 3188.67 W 6005444.69 N 562433.71 E 7.843 5870.09 8324.00 87.050 333.090 4084.48 4151.08 5578.97 N 3210.23 W 6005486.71 N 562411.78 E 10.410 5914.53 8417.78 88.090 333.090 4088.45 4155.05 5662.52 N 3252.63 W 6005569.89 N 562368.64 E 1.109 6002.44 8510.71 88.210 333.330 4091.45 4158.05 5745.44 N 3294.50 W 6005652.43 N 562326.05 E 0.289 6089.66 8604.82 87.290 333.970 4095.15 4161.75 5829.70 N 3336.24 W 6005736.32 N 562283.57 E 1.191 617821 8698.90 86.120 335.120 4100.56 4167.16 5914.50 N 3376.60 W 6005820.77 N 562242.46 E 1.742 6267.13 8792.09 87.350 336.610 4105.86 4172.46 5999.41 N 3414.64 W 6005905.33 N 562203.68 E 2.071 6355.88 8884,77 87.780 339.670 4109.80 4176.40 6085.33 N 3449.12 W 6005990.95 N 562168.45 E 3.331 6445.24 8977,35 88.650 342.440 4112.69 4179.29 6172.85 N 3479.16 W 6006078.20 N 562137.64 E 3.135 6535.65 9070.85 88.460 345.680 4115.04 4181.64 6262.71 N 3504.82 W 6006167.83 N 562111.19 E 3.470 6627.89 9164,83 87.290 346.410 4118.53 4185.13 6353.85 N 3527.47 W 6006258.77 N 562087.74 E 1.467 6721.05 9184,60 87,350 346.190 4119.45 4186.05 6373.04 N 3532.15W 6006277.92 N 562082.89 E 1.152 6740.65 9261.40 86.930 349.550 4123.29 4189.89 6448.02 N 3548.26 W 6006352.75 N 562066.12 E 4.404 6817.00 9311.21 85,690 349.370 4126.50 4193.10 6496.95 N 3557.37 W 6006401.60 N 562056.58 E 2.512 6866.65 9355.40 86.500 353.790 4129.50 4196.10 6540.49 N 3.S1,.W 6006445.08 N 562049.76 E 10.160 6910.64 9402.05 89.080 358.030 4131.30 4197.90 6566.91N .t3W 6006491.53 N 562046.03 E 10.633 695720 9448.07 90.490 2200 41 31.48 4198.08 6632.98 N 7.04W 6006537.54 N 562045.71 E 9.565 7002.88 ------.- 28 October, 2002 - 15:14 P"g. 4 of 11 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29 Your Ref: API 500292311900 Job No. AKZZ22160, Surveyed: 9 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertica' Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Ealstlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9499.02 91.290 6.200 4130.68 4197.28 6683.77 N 3563.31 W 6006588.37 N 562049.00 E 8.005 7052,90 9541,95 90,550 10.350 4129.99 4196.59 6726.24 N 3557.13 W 6006630.89 N 562054.80 E 9.818 7094.36 9591 ,82 89,750 16.730 4129.86 4196.46 .' 6774.70 N 3545.47 W 6006679.45 N 562066.04 E 12.893 7141.13 9634.77 88.950 22.480 4130.35 4196.95 6815.14 N 3531.06 W 6006720.01 N 562080.09 E 13.516 7179.62 9687,74 90,000 29.090 4130.84 4197.44 6862.81 N 3508.03 W 6006767.88 N 562102.70 E 12.635 7224.29 9728.88 90.620 34.920 4130.61 4197.21 6897.68 N 3486.24 W 6006802.94 N 562124.19 E 14.251 7256.39 -' 9780.92 90.120 41.670 4130.28 4196.88 6938.50 N 3454.01 W 6006844.04 N 562156.06 E 13.006 7293.18 9823.06 89.750 46.780 4130.33 4196.93 6968.68 N 3424.63 W 6006874.48 N 562185.17 E 12.158 7319.74 9869.66 90.250 53.410 4130.33 4196.93 6998.56 N 3388.90 W 6006904.67 N 562220.64 E 14.268 7345.26 9915.20 89.260 55.770 4130.52 4197.12 7024.95 N 3351.79 W 6006931.38 N 562257.51 E 5.620 7367.15 9963.46 88.220 54.600 4131.58 4198.18 7052.49 N 3312.18 W 6006959.28 N 562296.88 E 3.243 7389.90 10010,13 86.000 55.610 4133.93 4200.53 7079.16 N 3273.95 W 6006986.28 N 562334.87 E 5.225 7411.94 10058.74 85.690 55.510 4137.46 4204.06 7106.57 N 3233.97 W 6007014.04 N 562374.61 E 0.670 7434.52 10103.55 85.630 54.950 4140.85 4207.45 7132.06 N 3197.26 W 6007039.85 N 562411.09 E 1.253 7455.56 10152.40 86.490 54.040 4144.20 4210.80 7160.36 N 3157.59 W 6007068.50 N 562450.51 E 2.560 7479.05 10197,03 86.430 54.050 4146.96 4213.56 7186.51 N 3121.53 W 6007094.97 N 562486.34 E 0.136 7500.84 10245.35 86.980 53.340 4149.74 4216.34 7215.08 N 3082.66 W 6007123.87 N 562524.96 E 1.857 7524.68 10290,30 85.200 52.840 4152.80 4219.40 7242.01 N 3046.80 W 6007151.12 N 562560.58 E 4.113 7547.26 10338.83 85.310 52.770 4156.82 4223.42 7271.24 N 3008.27 W 6007180.69 N 562598.85 E 0.268 7571.82 10383,76 85,620 52.010 4160.37 4226.97 7298.58 N 2972.79 W 6007208.34 N 562634.09 E 1.822 7594.84 10433.21 85.260 52.050 4164.30 4230.90 7328.91 N 2933.93 W 6007239.00 N 562672.68 E 0.732 7620.44 10477.18 85.190 52.110 4167.96 4234.56 7355.83 N 2899.37 W 6007266.24 N 562707.01 E 0.209 7643.16 10527,31 85.000 51.680 4172.25 4238.85 7386.66 N 2860.07 W 6007297.40 N 562746.04 E 0.935 7669.20 10571.44 84.710 51.640 4176.20 4242.80 7413.92 N 2825.59 W 6007324.97 N 562780.27 E 0.663 7692.27 ~ 10620.87 86.430 49.710 4180.02 4246.62 7445.15 N 2187.47 W 6007356.53 N 562818.11 E 5.221 7718.86 10663,72 86.490 49.020 4182.67 4249.27 7473.00 N 2755.02 W 6007384.67 N 562850.32 E 1.613 7742,74 10714.38 88,340 47.670 4184.95 4251.55 7506.64 N 2117.21 W 6007418.63 N 562887.83 E 4.519 7771.75 10757.fJ1 87.300 46.620 4186.57 4253.17 7535.61 N 2685.98 W 6007447.88 N 562918.81 E 3.465 7796.90 10807.65 87.660 46.610 4188.80 4255.40 7570.36 N 2649.21 W 6007482.95 N 562955.27 E 0.711 7827.13 10851.17 88.220 47.460 4190.37 4256.97 7600.00 N 2$17.39W 6007512.87 N 562986.83 E 2.338 7852.87 10899,60 88.710 46.980 4191.66 4258.26 7632.88 N 2581.85 W 6007546.07 N 563022.07 E 1.416 7881.40 10944,30 85.200 47.100 4194.04 4260.64 7663.30 N ~649.19 W 6007576.77 N 563054.46 E 7.857 7907.81 10994.26 87.660 47.190 4197.15 4263.75 7697.21 N 2.64W 6007611.00 N 563090.72 E 4.927 7937.24 11037,88 87.540 46.830 4198.97 4265.57 7726.93N .76W 6007640.99 N 563122.33 E 0.869 7963.04 11086.40 88,,950 47.520 4200.46 4267.06 7759.89N 5.19W 6007674.27 N 563157.61 E 3.235 7991.65 --- 28 October, 2002 - 15:14 Page 50fB DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey R( port for Milne Point MPS - MPS-29 Your Ref: API 500292311900 Job No. AKZZ221fØ, Surveyed: 9 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 11130,91 89,320 47,150 4201.13 4267.73 7790.05 N 2412.47 W 6007704.72 N 563190.07 E 1.176 8017.80 11179,80 90,310 46.710 4201.29 4267.89 7823.44 N 2376.75 W 6007738.42 N 563225.49 E 2.216 8046.80 11225,11 90.490 46.740 4200.97 4267.57 .. 7854.50 N 2343.77 W 6007769.77 N 563258.20 E 0.403 8073.81 11274.24 89.940 45.990 4200.79 4267.39 7888.40 N 2308.21 W 6007803.98 N 563293.46 E 1.893 8103.35 11317.50 90.990 46.830 4200.44 4267.04 7918.23 N 2276.88 W 6007834.08 N 563324.53 E 3.108 8129.33 11365.23 86.620 44.950 4201.43 4268.03 7951.43 N 2242.62 W 6007867.58 N 563358.49 E 9.966 8158.32 - 11410.77 84.520 44.870 4204.95 4271.55 7983.58 N 2210.57 W 6007900.02 N 563390.26 E 4.615 8186.53 11459.91 83.770 44.960 4209.96 4276.56 8018.20 N 2176.06 W 6007934.94 N 563424.47 E 1.537 8216.90 11504,14 85,940 44.570 4213.93 4280.53 8049.48 N 2145.04 W 6007966.48 N 563455.21 E 4.984 8244.35 11555.35 88,520 44.410 4216.40 4283.00 8085.96 N 2109.20 W 6008003.28 N 563490.73 E 5.048 8276.42 11597,85 88.950 44.900 4217.34 4283.94 8116.19 N 2079.33 W 6008033.77 N 563520.32 E 1.534 8302.97 11647,80 88.400 44.470 4218.50 4285.10 8151.69 N 2044.22 W 6008069.58 N 563555.13 E 1.398 8334.14 11690.63 86.500 43.400 4220.40 4287.00 8182.50 N 2014.53 W 6008100.65 N 563584.54 E 5.090 8361.29 11745.20 86.430 43.650 4223.77 4290.37 8221.99 N 1977.02 W 6008140.47 N 563621.70 E 0.475 8396,15 11784,63 84,580 43.970 4226.86 4293.46 8250.36 N 1949.81 W 6008169.08 N 563648.66 E 4.761 8421.16 11832.66 87.470 44.190 4230.19 4296.79 8284.78 N 1916.48 W 6008203.78 N 563681.69 E 6.034 8451.47 11877.77 86.980 43.340 4232.37 4298.97 8317.31 N 1885.32 W 6008236.60 N 563712.57 E 2.173 8480.16 11925.85 87.110 43.820 4234.85 4301.45 8352.10 N 1852.22 W 6008271.67 N 563745.36 E 1.033 8510.86 11970.82 86.990 42.930 4237.16 4303.76 8384.74 N 1821.37 W 6008304.58 N 563775.91 E 1.994 8539.69 12018.25 86.430 42.050 4239.89 4306.49 8419.66 N 1789.39 W 6008339.78 N 563807.59 E 2.197 8570.65 12064.63 88.340 42.890 4242.00 4308.60 8453.83 N 1758.11 W 6008374.23 N 563838.57 E 4.498 8600.95 12117,97 88.520 42.840 4243.46 4310.06 8492.91 N 1721.83 W 6008413.63 N 563874.50 E 0.350 8635.55 12157,36 88.950 44.660 4244.33 4310.93 8521.36 N 1694.60 W 6008442.31 N 563901.48 E 4.747 8660.63 12205.88 89.140 45.280 4245.14 4311.74 8555.68 N 1660.32 W 6008476.93 N 563935.46 E 1.336 8690.73 ~ 12251.13 89.080 43.630 4245.85 4312.45 8587.98 N 1628.63 W 6008509.50 N 563966.86 E 3.648 8719.12 12297.90 89.080 42.440 4246.60 4313.20 8622.16 N 1596.72 W 6008543.96 N 563998.47 E 2.544 8749.36 12332,69 89.080 42,300 4247.15 4313.75 8647.86 N 1513.28 W 6008569.87 N 564021.69 E 0.402 8772.16 12391.26 91.230 43.590 4247.00 4313.60 8690.73 N 1533.38 W 6008613.09 N 564061.21 E 4.281 8810.10 12436,12 90.000 41.860 4246.51 4313.11 8723.68 N 1502.94 W 6008646.31 N 564091.35 E 4.732 8839.28 12488.20 91.050 42.230 4246.04 4312.64 8762.35 N 1468.07 W 6008685.28 N 564125.89 E 2.138 8873.64 12529.41 90.860 42,380 4245.35 4311.95 8792.82 N 1440.33 W 6008716.00 N 564153.35 E 0.587 8900.68 12580.32 90.740 40.890 4244.64 4311.24 8830.87 N 1.406.51W 6008754.34 N 564186.83 E 2.936 8934.53 12625.50 90,920 41 .450 4243.99 4310.59 8864.88 N 1376.77 W 6008788.61 N 564216.27 E 1.302 8964.85 12675.30 89.690 41 .320 4243.72 4310.32 8902.24 N 1343.85 W 6008826.26 N 564248.87 E 2.484 8998.13 12718.07 881280 39.430 4244.48 4311.08 8934.81 N 1316.15W 6008859.08 N 564276.28 E 5.513 9027.26 28 October, 2002 - 15:14 R,ge 6 of 1I DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for MIlne Point MPS - MPS-29 Your Ref: AP/5D0292311900 Job No. AKZZ221fSO, Surveyed: 9 Oc:tober, 2002 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) Local Coordinates Northings Eastings (ft) (ft) Incl. Azim. 4312.73 8973.29 N 1284.92 W 4314.23 9007.64 N 1257.72 W 4315.27 .. 9046.53 N 1226.92 W 4315.10 9062.49 N 1214.06W 4313.26 9115.60 N 'l171.02 W . ~ ~ All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes. Zone 4. The Dogleg Severity is in Degrees per 1°° feet (US). Vertical Section is from Well and calculated along an Azimuth of 353.3209 (True). 12767,66 87.910 12811,49 88.150 12861,12 89,450 12881.61 91.540 12950.00 91.540 38,710 38.030 38.720 39.020 39.020 4246.13 4247.63 4248.67 4248.50 4246.66 Magnetic Declination at Surface is 25.734°(29-Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.00ft., The Bottom Hole Displacement is 9190.51f1., in the Direction of 352.680° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 12950,00 4313.26 9115.60 N Projected Survey 1171.02 W 28 October, 2002 - 15:14 :p.ge 7 Of 8 Global Coordinates Northings Eastings (ft) (ft) 6008897.83 N 6008932.41 N 6008971.58 N 6008987.64 N 6009041.13 N 564307.18 E 564334.06 E 564364.52 E 564377.24 E 564419.81 E BPXA Dogleg Rate (9/100ft) Vertical Section Comment 1.632 9061.84 1.644 9092.79 2.965 9127.84 10.305 9142.19 0.000 9189.94 Projected Survey '- ~~ DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne PoInt MPS - MPS-29 Your Ref: API 51)0292311900 Job No. AKZZ22160, Surveyed: 9 October, 2002 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit BPXA Survey tool program for MPS-29 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 178.00 0.00 178.00 178.00 12950.00 178.00 AK-1 BP _HG 4313.26 AK-6 BP _IFR-AK ~' '---~ 28 October, 2002 - 15:14 ~ge B.o',8 DrillQuest 3.03.02.002 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ) Re: Distribution of Survey Data for Well MPS-29MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window I Kickoff Survey Projected Survey: 0.00' MD 0.00' M D (if applicable) 12,950.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment( s) 31-0ct-02 j:J i-' "''4 ~ B', v~= f ,'r...':' i \ l'"¡' -" ~'"'" ~ ~f. i- ~ IV i":; fLJ ',ro; I II¿ \r 0 7 ", ~~-~:¡'j~:~.~~¥;,~) ..'-'.'.II~a& ~tB--ICj 5 .,,- Sperry-Sun ~ . .,8èrvices ~ Job No. AKMW22160, SU"'éYØd: 9 OCtober, 2002 Survey fJort 28 OctQbe'lÞ02 Your Ref: AÞt 31-1WO Surface Coordinates: 5999936.18 N, 5656tO.94. . 24~36.9759" N, 149027' 54.9398" W) Grid Coordinate System: NAD27 Atilslta State Pltínes, Zone 4 "-" Surface Coordinates relative to Project H Reftrénce:999936.18 ~ 65670.94 E (Grid) Surface Coordinates relative to StrUcture: 32.89 S, 674.38 W(True) Kelly Bushing: 66.6Dft abôve Mean Sea Level Elevation relative to ProjecfVReference: 66.6Oft Elevation relative to Structure: 66.6Oft Si' ""I'1c,~1IUI1 D~.LL'NG s...v.ces A HatJIburton Company Survey Ref: 5vy10207 Sperry-Sun"ll/l' a.".¡ces Survey Report for MI/ít,'P " S-ÍtfPS..29MWD Your Ref: ",' 119tJÐ Job No. AKMW22160," 'Survè1fÞl1: 9 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordlnà. Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs ':-'1'19$ Northh'IGs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (It) (ft) (ft) (0/100ft) 0.00 0,000 0.000 -66.60 0.00 O.OON O.OOE 5999936.18 N 565670.94 E 0.00 AK-1 BP HG 178.00 0.080 44.900 111.40 178.00 0.09N 0.09E 5999936.27 N 565671.03 E 0.045 0.08 MWD Magnetic 295.39 2.130 324.790 228.76 295.36 1.93 N 1.11 W 5999938.10 N 565669.81 E 1.804 2.04 384.23 4.110 327.610 317.47 384.07 5.97N 3.77W 5999942.11 N 565667.12 E 2.235 6.36 472.94 5.770 327.340 405.84 472.44 12.41 N 7.88W 5999948.52 N 565662.95 E 1.871 13.24 563.49 7.100 325.570 495.82 562.42 20.85 N 13.50 W 5999956.91 N 565657.26 E 1.485 22.28 - 655.62 7.920 327.010 587.16 653.76 30.87 N 20.18 W 5999966.88 N 565650.49 E 0.913 33.01 750.33 11.590 329.700 680.49 747.09 44.57 N 28.53W 5999980.49 N 565642.02 E 3.904 47.58 843.52 13.910 329.130 771.37 837.97 62.27 N 39.00 W 5999998.10 N 565631.39 E 2.493 66.38 936.53 16.360 329.250 861.15 927.75 83.12 N 51.44W 6000018.85 N 565618.77 E 2.634 88.54 1029.34 17.670 329.470 949.89 1016.49 106.49 N 65.28W 6000042.09 N 565604.73 E 1.413 113.36 1123.93 18.900 327.590 1039.71 1106.31 131.79N 80.78 W 6000067.25 N ' 565589.00 E 1.442 140.29 1216.21 21.520 327.690 1126.30 1192.90 158.72 N 91.84W 6000094.03 N 565571.71 E 2.839 169.02 1310.11 26.160 326.410 1212.16 1278.76 190.53 N 118.51 W 6000125.66 N 565550.76 E 4.972 203.02 1403.93 28.300 326.230 1295.58 1362.18 226.25 N 142.32 W 6000161.17 N 565526.64 E 2.283 241.27 1497.45 31.110 324.020 1376.81 1443.41 264.24 N 168.84 W 6000198.92 N 565499.78 E 3.224 282.09 1591.80 32.390 323.620 1457.04 1523.64 304.31 N 198.15 W 6000238.74 N 565470.12 E 1.375 325.29 1685.03 34.100 322.970 1535.00 1601.60 345.28 N 228.70 W 6000279.44 N 565439.21 E 1.874 369.54 1778.08 34.760 322.730 1611.75 1678.35 387.21 N 260.47 W 6000321.09 N 565407.07 E 0.724 414.89 1871.59 37.400 323.120 1687.32 1753.92 431.15 N 293.67 W 6000364.73 N 565373.49 E 2.834 462.38 1963.61 38.880 323.620 1759.69 1826.29 476.76 N 327.57W 6000410.04 N 565339.19 E 1.643 511.63 2058.24 42.150 325.080 1831.63 1898.23 526.72 N 363.37W 6000459.68 N 565302.95 E 3.598 565.41 2151.67 43.210 328.520 1900.32 1966.92 579.71 N 398.02 W 6000512.37 N 565267.83 E 2.741 622.07 ~ 2245.02 44.000 324.930 1967.93 2034.53 633.51 N 433.35 W 6000565.85 N 565232.04 E 2.784 679.62 2338.49 47.420 328.040 2033,19 2099.79 689.30 N 470.23 W 6000621.32 N 565194.66 E 4.365 739.32 2431.77 52.380 328.150 2093.26 2159.86 749.85 N 507.93 W 6000681.54 N 565156.44 E 5.318 803.85 2524.87 58.610 329.590 2145.97 2212.57 815.51 N 547.54 W 6000746.85 N 565116.25 E 6.812 873.67 2618.05 65.170 332.500 2189.86 2256.46 887.41 N 587.25 W 6000818.39 N 565075.91 E 7.559 949.69 2711,96 66.510 332.540 2228.30 2294.90 963.42 N 626.78 W 6000894.05 N 565035.71 E 1.427 1029.79 2t305.42 64.950 331.000 2266.71 2333.31 1038.49 N 667.08 W 6000968.76 N 564994.76 E 2.245 1109,03 2898. 99 67.190 330.910 2304.66 2371.26 1113.25 N 708.60 W 6001043.16 N 564952.58 E 2.396 1188.12 2992.23 72.640 330.540 2336.67 2403.27 1189.61 N 751.41 W 6001119.13 N 564909.10 E 5.857 1268.94 3085.49 73,140 330.520 2364.11 2430.71 1267.21 N 795.26 W 6001196.34 N 564864.57 E 0.537 1351.11 3'175.56 70.240 333.610 2392.41 2459.01 1342.72 N 835.32 W 6001271.51 N 564823.84 E 4.579 1430,78 3268,62 69,170 334.350 2424,69 2491.29 1421.16 N 873.61 W 6001349.60 N 564784.87 E 1.370 1513,13 ---_._-----._-_._--'-~-. --> ---_.~-~_. "---_.. ~----- -----~~.._._---..-~------_._.._-------- _.--._-.-_._---~-_.------- 28 October, 2002 - 15:25 Page 20f8 DrmQuest .1.03.02.002 Sperry-SuniD'~I_>~øPJì;ces Survey Report for MHnepóf(l'?MÞs.MPS..29:MWD Your Ref: API=litJó2Ø3119lÎO Job No. AKMW22160, Sumýed: 9 October, 2002 BP EXPLORA r/ON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates GlObal Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1ooft) 3362.37 69.420 334.420 2457.83 2524.43 1500.23 N 911.52W 600>1428.34 N 564746.26 E 0.276 1596.08 3455.52 68.970 333.590 2490.92 2557.52 1578.50 N 949.69W 6001506:27 N 564707.41 E 0.963 1678.25 3549.02 68.380 333.050 2524.92 2591.52 1656.32 N 988.79 W 6001583.75 N 564667.62 E 0.829 1760.10 3642.36 72.060 330.630 2556.51 2623.11 1733.73 N 1030.25 W 6001660.78 N 564625.48 E 4.636 1841.80 3735.4 7 74.170 329.060 2583.55 2650.15 1810.76 N 1075.01 W 6001737.42 N 564580.05 E 2.782 1923.51 - 3828.71 71.320 327.670 2611.21 2677.81 1886.56 N 1121.70 W 6001812.81 N 564532.69 E 3.372 2004.24 3922.26 72.620 327.930 2640.16 2706.76 1961.84 N 1169.10W 6001887.66 N 564484.63 E 1.415 2084.51 4016.54 72.040 328.520 2668.78 2735.38 2038.20 N 1216.41 W 6001963.61 N 564436.66 E 0.857 2165.86 4110.04 72.750 328.330 2697.06 2763.66 2114.13 N 1263.07 W 6002039.12 N 564389.33 E 0.784 2246.70 4204.02 70.540 328.420 2726.65 2793.25 2190.08 N 1309.84 W 6002114.66 N 564341.89 E 2.353 2327.58 4297.17 69.990 328.400 2758.10 2824.70 2264.76 N 1355.77 W 6002188.94 N 564295.31 E 0.591 2407.10 4390.03 70.340 328.420 2789.61 2856.21 2339.17 N 1401.53 W 6002262.94 N 564248.90 E 0.377 2486.32 4480.89 69.500 329.200 2820.81 2887.41 2412.17 N 1445.72W 6002335.55 N 564204.06 E 1.227 2563.97 4577.70 67,180 330.520 2856.54 2923.14 2489.97 N 1490.90 W 6002412.94 N 564158.20 E 2.711 2646.49 4670.64 70.140 330.410 2890.36 2956.96 2565.28 N 1533.57W 6002487.88 N 564114.87 E 3.187 2726.26 4764.09 71 .190 330.710 2921.30 2987.90 2642.07 N 1576.91W 6002564.28 N 564070.86 E 1.164 2807.57 4857.47 71.530 331.160 2951.14 3017.74 2719.41 N 1619.90W 6002641.24 N 564027.19 E 0.584 2889.38 4950.94 71.650 331.000 2980.66 3047.26 2797.04 N 1662.79 W 6002718.49 N 563983.62 E 0.207 2971.47 5044.12 71.410 330.730 3010.18 3076.78 2874.23 N 1705.82 W 6002795.30 N 563939.92 E 0.377 3053.15 5137.90 71.730 330.210 3039.83 3106.43 2951.65 N 1749.67 W 6002872.33 N 563895.39 E 0.627 3135.14 5231.49 71.840 329.930 3069.08 3135.68 3028.69 N 1794.02W 6002948.98 N 563850.36 E 0.308 3216.82 5324.61 70.400 331.540 3099.22 3165.82 3105.55 N 1837.10W 6003025.45 N 563806.61 E 2.251 3298.16 5417.77 70.140 332.020 3130.67 3197.27 3182.81 N 1878.56 W 6003102.35 N 563764.46 E 0.560 3379.73 ~ 5511.35 69.920 331.930 3162.63 3229.23 3260.45 N 1919.89 W 6003179.63 N 563722.46 E 0.252 3461.65 5604.68 70.870 332.430 3193.94 3260.54 3338.21 N 1960.92 W 6003257.02 N 563680.75 E 1.136 3543.65 5698.53 71.280 332.090 3224.38 3290.98 3416.78 N 2002.24 W 6003335.23 N 563638.73 E 0.555 3626.50 5791.90 71.350 331.310 3254.29 3320.89 3494.66 N 2044.11W 6003412.73 N 563596.12 E 0.795 3708.72 5885.42 71.590 329.990 3284.02 3350.62 3571.95 N 2087.63 W 6003489.63 N 563551.98 E 1.363 3790.54 5978.90 71 .850 329.200 3313.34 3379.94 3648.50 N 2132.56 W 6003565.79 N 563506.39 E 0.849 3871,80 6072.07 69.580 331.030 3344.11 3410.71 3724.74 N 2176.38 W 6003641.64 N 563461.90 E 3.061 3952,62 6165.54 68.930 330.880 3377.22 3443.82 3801.15 N 2218.82 W 6003717.68 N 563418.79 E 0.711 4033.45 6258,84 69.000 329.780 3410.71 3477.31 3876.82 N 2261.92W 6003792.96 N 563375.02 E 1.103 4113,61 6352.21 69.960 329.990 3443.44 3510.04 3952.46 N 2305.79 W 6003868.21 N 563330.48 E 1.050 4193.85 6445,88 71 .090 328.760 3474,67 3541.27 4028.45 N 2350.78 W 6003943.80 N 563284.83 E 1,729 4274.55 6539.20 72,690 328.590 3503.67 3570.27 4104.21 N 2396.89 W 6004019.16 N 563238.05 E 1.723 4355,17 ----..---.-------.-.------.--.-.. -.--..----- --_..._-----~ ----~-_.~- ~_._---.-.---_. -_..__..---_._------~_u_---'-_.__._._---'- 28 October, 2002 - 15:25 Page30f8 DrillQuest 3.03.02.002 Sperry-SunDttl~: '/ices Survey Report for MIlne' ,S-.'MWD Your Ref: APlllltJftØ11100 Job No. AKAfW22160, Suff1Íy.(I:JObfober, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne PoInt Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 6632.41 71.130 328.880 3532.61 3599.21 4179.95 N 2442.88 W 6004094A8 N 563191.40 E 1.700 4435.73 6726.06 69.640 329.590 3564.05 3630.65 4255.74 N 2488.00 W 6004169.88 N 563145.61 E 1.744 4516.27 6819.22 69.210 329.180 3596.79 3663.39 4330.80 N 2532.42 W 6004244.55 N 563100.54 E 0.619 4595,98 6912.45 70.400 329.620 3628.98 3695.58 4406.11 N 2576.96 W 6004319.47 N 563055.34 E 1.351 4675.97 7006.23 69.690 329.150 3660.98 3727.58 4481.98 N 2621.85 W 6004394.93 N 563009.78 E 0.892 4756.53 7097.96 69.910 330.010 3692.66 3759.26 4556.21 N 2665.44 W 6004468.78 N 562965.55 E 0.912 4835.34 - 7189.84 70.440 328.580 3723.82 3790.42 4630.53 N 2709.57 W 6004542.10 N 562920.76 E 1.574 4914.28 7286.43 69.820 330.880 3756.65 3823.25 4708.97 N 2755.36 W 6004620.74 N 562874.28 E 2.330 4997.52 7379.75 70.520 332.310 3788.31 3854.91 4786.19 N 2797.12W 6004697.59 N 562831.85 E 1.625 5079.07 7482.64 72.030 333.540 3821.34 3887.94 4872.95 N 2841.46 W 6004783.96 N 562786.74 E 1.854 5170.40 7575.89 71.010 335.480 3850.90 3917.50 4952.78 N 2879.53W 6004863.45 N 562747.98 E 2.256 5254.11 7668.53 70.580 338.370 3881.38 3947.98 5033.25 N 2913.81W 6004943.61 N 562712.99 E 2.982 5338.03 7762.44 70.740 336.460 3912.48 3979.08 5115.06 N 2947.84W 6005025.12 N 562678.24 E 1.927 5423.24 7855.75 69.390 335.920 3944.30 4010.90 5195.31 N 2983.25 W 6005105.06 N 562642.12 E 1.546 5507.07 7949.49 68.540 334.590 3977.94 4044.54 5274.77 N 3019.81W 6005184.19 N 562604.81 E 1.605 5590.24 8043.49 67.640 335.280 4013.02 4079.62 5353.76 N 3056.82 W 6005262.86 N 562567.17 E 1.175 5673.00 8137.17 69.920 335.450 4046.93 4113.53 5433.14 N 3093.22 W 6005341.91 N 562530.07 E 2.440 5756.07 8230.07 78.470 336.760 4072.21 4138.81 5514.80 N 3129.31W 6005423.25 N 562493.20 E 9.303 5841.38 8276.37 82.100 336.480 4080.02 4146.62 5556.68 N 3141.48W 6005464.97 N 562474.73 E 7.863 5885.08 8324.00 87,050 336.020 4084.52 4151.12 5600.07 N 3166.57 W 6005508.19 N 562455.25 E 10.437 5930.40 8417.78 88.090 334.700 4088.50 4155.10 5685.23 N 3205.63 W 6005593.00 N 562415.45 E 1.791 6019.52 8510.71 88.210 336.000 4091.50 4158.10 5769.64 N 3244.37 W 6005677.07 N 562375.97 E 1 .404 6107.87 8604.82 87.290 336.510 4095.19 4161.79 5855.72 N 3282.23 W 6005762.81 N 562337.35 E 1.118 6197.77 ~ 8698.90 86.120 336.780 4100.60 4167.20 5941.95 N 3319.47 W 6005848.71 N 562299.36 E 1.276 6287.74 8792.09 87.350 336.900 4105.91 4172.51 6027.48 N 3356.06 W 6005933.92 N 562262.01 E 1.326 6376.96 8884.77 87.780 340.050 4109.84 4176.44 6113.61 N 3390.03 W 6006019.75 N 562227.29 E 3.427 6466.45 8077.35 88.650 342.230 4112.73 4179.33 6201.17 N 3419.94W 6006107.04 N 562196.61 E 2.534 6556.90 9070.85 88.460 345.970 4115.09 4181.69 6291.05 N 3445.54 W 6006196.69 N 562170.22 E 4.004 6649.14 9164.83 87.290 345.960 4118.57 4185.17 6382.16 N 3468.32 W 6006287.60 N 562146.64 E 1.245 6742.28 9184.60 87.350 346.720 4119.50 4186.10 6401.35 N 3472.98 W 6006306.75 N 5a?141.81 E 3.852 6761.89 9261 .40 86,930 351.010 4123.33 4189.93 6476.59 N 3487.79W 6006381.86 N 562126.34 E 5.606 6838.34 9:H 1 .27 85,690 350.010 4126.54 4193.14 6525.68 N 3495.99 W 6006430.87 N 562117.70 E 3.192 6888, 04 9355.40 86.500 354.340 4129.55 4196.15 6569.28 N 3501.99 W 6006474.42 N 562111.33 E 9.960 6932,05 9402.05 89.080 358.440 4131.35 4197.95 6615.79 N 3504.92 W 6006520.90 N 562107.99 E 10,378 6978,59 9448.07 90.490 2,380 4131,52 4198.12 6661.80 N 3504.59 W 6006566.91 N 562107.91 E 9.093 7024.24 -----_._~---_._-.--_.~._-~. ._----_..__._---~- --~--------_._---~_._--~ _..._~-.-.- --- - ~ -~.-----_.~~- 28 October, 2002. 15:25 Page 4 0'8 Dri/lQlIest 3.03.02.002 Sperry-SunDri Sswices Survey Report for MIlne P, " .;"",S.29MWD Your Ref: API 1'f1ttlO Job No. AKMW22160, SU~! 9 Oefober, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local CoordinatèS Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9499.02 91.290 6.280 4130.73 4197.33 6712.59 N 3500.74W 6006617.73 N 562111.31E 7.813 7074.24 9541.95 90.550 10.590 4130.04 4196.64 6755.04 N 3494.45W 6008660.23 N 562117.23 E 10.185 7115.67 9591.82 89.750 17.070 4129.91 4196.51 6803.44 N 3482.54W 6006708.73 N 562128.72 E 13.092 7162.35 9634.77 88.950 22.830 4130.39 4196.99 6843.79 N 3467.89W 6006749.21 N 562143.01 E 13.539 7200.73 9687.74 90.000 29.490 4130.88 4197.48 6891.30 N 3444.55 W 6006796.93 N 562165.93 E 12.728 7245.21 ~ 9728.88 90.620 35.140 4130.66 4197.26 6926.06 N , 3422.57 W 6006831.88 N 562187.61 E 13.816 7277.17 9780.92 90.120 41.560 4130.32 4196.92 6966.85 N 3390.29W 6006872.95 N 562219.52 E 12.374 7313.92 9823.06 89.750 46.440 4130.37 4196.97 6997.15 N 3361.03 W 6006903.51 N 562248.52 E 11.614 7340.62 9869.66 90.250 52.420 4130.37 4196.97 7027.44 N 3325.65 W 6006934.11 N 562283.63 E 12.877 7366.59 9915.20 89.260 56.010 4130.56 4197.16 7054.07 N 3288.71 W 6006961.06 N 562320.33 E 8.177 7388.74 9963.46 88.220 54.910 4131.62 4198.22 7081.42 N 3248.97 W 6006988.76 N 562359.83 E 3.136 7411.28 10010.13 86.000 55.650 4133.98 4200.58 7107.97 N 3210.66 W 6007015.65 N 562397.90 E 5.013 7433.19 10058.74 85.690 55.840 4137.50 4204.10 7135.26 N 3170.59W 6007043.29 N 562437.74 E 0.747 7455.64 10103,55 85,630 55.480 4140.89 4207.49 7160.46 N 3133.70 W 6007068.81 N 562474.41 E 0.812 7476.38 10152.40 86.490 54.190 4144.25 4210.85 7188.53 N 3093.86 W 6007097.23 N 562514.00 E 3.169 7499.62 10197.03 86.430 53.920 4147.00 4213.60 7214.68 N 3057.79 W 6007123.70 N 562549.83 E 0.619 7521.40 10245.35 86.980 53.600 4149.78 4216.38 7243.20 N 3018.89 W 6007152.55 N 562588.48 E 1.316 7545.20 10290.30 85.200 53.240 4152.85 4219.45 7269.92 N 2982.88 W 6007179.59 N 562624.26 E 4.040 7567.55 10338.83 85.310 53.250 4156.86 4223.46 7298.86 N 2944.13 W 6007208.87 N 562662.75 E 0.228 7591.79 10383.76 85.620 52.470 4160.41 4227.01 7325.90 N 2908.42 W 6007236.23 N 562698.22 E 1.863 7614.49 10433.21 85.260 52.340 4164.34 4230.94 7355.98 N 2869.37 W 6007266.64 N 562737.01 E 0.774 7639.82 10477.18 85,190 52.420 4168.00 4234.60 7382.72 N 2834.66 W 6007293.70 N 562771.48 E 0.241 7662.34 10527.31 85,000 51.980 4172.29 4238.89 7413.34 N 2795.19 W 6007324.65 N 562810.67 E 0.953 7688,16 --, 10571.44 84.710 52.080 4176.25 4242.85 7440.38 N 2760.54 W 6007352.00 N 562845.08 E 0.695 7710.99 10620,87 86.430 50.050 4180.07 4246.67 7471.35 N 2722.21 W 6007383.30 N 562883.14 E 5.373 7737.29 10663,72 86.490 49.380 4182,71 4249.31 7499.00 N 2689.59 W 6007411.24 N 562915.52 E 1.567 7760.96 10714.38 88.340 48.050 4185.00 4251.60 7532.39 N 2651.56 W 6007444.97 N 562953.25 E 4.496 7789.70 10757.01 87.300 46.950 4186.62 4253.22 7561.17 N 2620.16W 6007474.02 N 562984.40 E 3.550 7814.63 10807.65 87,660 46.820 4188.84 4255.44 7595.75 N 2583.23 W 6007508.92 N 563021.03 E 0.756 7844.67 1 0851 . 1 7 88.220 47.650 4190.41 4257.01 7625.28 N 2551.30 W 6007538.73 N 563.052.70 E 2.300 7870.29 10899.60 88.710 47.900 4191.71 4258.31 7657.81 N 2515.45 W 6007571.58 N 563088.26 E 1.136 7898.43 10944.30 85.200 47.770 4194.08 4260.68 7687.77 N 2482.37 W 6007601.83 N 563121.07 E 7.858 7924,34 10994.26 87.660 47.790 4197.19 4263.79 7721.27 N 2445.44 W 6007635.65 N 563157.70 E 4.924 7953.32 11037,88 87.540 47.410 4199.02 4265.62 7750.66 N 2413.26 W 6007665.32 N 563189.63 E 0.913 7978,77 11086.40 88,950 47.440 4200.50 4267.10 7783.47 N 2377.55 W 6007698.45 N 563225.05 E 2.907 8007.20 ------~...._-_.__.+_.,_._.-._.+-_.-._-----~----- --~--.........--..,....---~--~._------_.. ---. '_U_~--'--~'------_._- 28 October, 2002 - 15:25 Page 50f8 Dri/lQuest 3.03.02.002 Sperry-Sun "DI'(I.(Jilervices Survey Report for MIlne POIiJtiffs ..IIPS..29MWD Your Re':API~11900 Job No. AKMW22180,SutYtltf/:9 OCfOber, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordl"".. Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northll1gs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 11130.91 89.320 48.180 4201.18 4267.78 7813.36 N 2344.57W 6007728.62 N 563257.76 E 1.859 8033.05 11179.80 90.310 46.980 4201.33 4267.93 7846.34 N 2308.48W 6001761.92 N 563293.56 E 3.182 8061.60 11225.11 90.490 47.380 4201.02 4267.62 7877.14 N 2275.25W 6001193.01 N 563326.52 E 0.968 8088.33 11274.24 89.940 46.170 4200.83 4267.43 7910.78 N 2239.45W 6001826.97 N 563362.02 E 2.705 8117.58 11317.50 90.990 48.160 4200.48 4267.08 7940.19 N 2207.73W 6007856.65 N 563393.48 E 5.201 8143.10 '~ 11365.23 86.620 46.280 4201.48 4268.08 7972.59 N , 2172.71 W 6007889.36 N 563428.21 E 9.966 8171.21 11410.77 84.520 46.130 4204.99 4271.59 8004.01 N 2139.94W 6001921.01 N 563460.70 E 4.623 8198.60 11459.91 83.770 45.940 4210.01 4276.61 8037.95 N 2104.76W 6001955.31 N 563495.59 E 1.574 8228.22 11504.14 85.940 44.960 4213.97 4280.57 8068.85 N 2013.31W 6007986.49 N 563526.71 E 5.380 8255.26 11555.35 88.520 45.070 4216.45 4283.05 8105.01 N 2031.19W 6008022.96 N 563562.56 E 5.043 8286.96 11597.85 88.950 45.510 4217.39 4283.99 8134.90 N 2007.00W 6008053.12 N 563592.49 E 1.447 8313.14 11647.80 88.400 45.090 4218.54 4285.14 8170.02 N 1911.50W 6008088.55 N 563627.68 E 1.385 8343.89 11690.63 86.500 44.090 4220.45 4287.05 8200.49 N 1941.41W 6008119.29 N 563657.45 E 5.012 8370.66 11745.20 86.430 43.180 4223.81 4290.41 8239.91 N 1903.88W 6008159.03 N 563694.68 E 1.669 8405.44 11784.63 84.580 44.040 4226.90 4293.50 8268.37 N 1876.17 W 6008181.73 N 563721.54 E 5.171 8430.55 11832.66 87.470 44.080 4230.23 4296.83 8302.80 N 1843.45 W 6008222.45 N 563754.55 E 6.018 8460.87 11877.77 86.980 43.660 4232.41 4299.01 8335.28 N 1812.23iW 6008255.21 N 563785.49 E 1.430 8489.50 11925.85 87.110 43.510 4234.89 4301.49 8370.06 N 1119.12W 6008290.28 N 563818.29 E 0.413 8520.20 11970.82 86.990 43.060 4237.21 4303.81 8402.76 N 1748.33W 6008323.24 N 563848.79 E 1.034 8549.09 12018.25 86.430 42.100 4239.93 4306.53 8437.62 N 1716.29W 6008358.39 N 563880.52 E 2.340 8579.99 12064.63 88.340 42.860 4242.05 4308.65 8471.79 N 1685.01, W 6008392.83 N 563911.51 E 4.432 8610.28 12117.97 88.520 42.300 4243.51 4310.11 8511.05 N 1648.93W 6008432.40 N 563947.24 E 1.102 8645.08 12157.36 88.950 43.910 4244.38 4310.98 8539.80 N 1622.02 W 6008461.39 N 563973.90 E 4.230 8670.51 -- 12205.88 89.140 45.130 4245.19 4311.79 8574.39 N 1588.00W 6008496.28 N 564007.61 E 2.544 8700.91 12251.13 89.080 43.690 4245.89 4312.49 8606.71 N 1556.34 W 6008528.87 N 564038.98 E 3.185 8729.32 .. 12297.90 89.080 42.010 4246.64 4313.24 8640.99 N 1524.54 W 6008563.44 N 564070.48 E 3.592 8759.67 12332.69 89.080 41.490 4247.20 4313.80 8666.95 N 1501.38W 6008589.59 N 564093.41 E 1 .494 8782.76 12391.26 91.230 43.110 4247.04 4313.64 8710.26 N 1461.96 W 6008633.25 N 564132.45 E 4.596 8821 .19 12436.12 90.000 41.800 4246.56 4313.16 8743.36 N 1431.69W 6008666.61 N 564162.43 E 4.006 8850.54 12488.20 91.050 41.920 4246.08 4312.68 8782.14 N 1396.93 W 6008705.70 N 564196.84 E 2.029 8885.02 12529.41 90.860 41.730 4245.39 4311.99 8812.85 N 1369.46W 6008736.65 N 564224.05 E 0.652 8912.32 12580.32 90.740 40.530 4244.68 4311.28 8851.19 N 1335.97 W 6008775.28 N 564257.19 E 2.369 8946.51 12625.50 90.920 41.330 4244.03 4310.63 8885.32 N 1306.38W 6008809.67 N 564286.49 E 1,815 8976.96 12675.30 89.690 41.480 4243.76 4310.36 8922.67 N 1273.44 W 6008847.31 N 564319.09 E 2.488 9010.23 12718.07 88.280 39.410 4244.52 4311.12 8955.21 N 1245.10 W 6008880.09 N 564346.54 E 5.855 9039.32 --------..~-~----_._-------------- _._--~------,._._.--,,-----...~_....---~.._. ._--,-~.->--_.--_._~---_._-- 28 October, 2002 - 15:25 Page 6 0'8 DrillQlIest 3.03.02.002 Sperry-SunDrl './:f1(~erttices Survey Report for Milne" ,'- ,.>- S .ÌlPS~29IfWD Your Ref:AP/~119ØO Job No. AKMW22160, Survtyed:9 October, 2002 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 12767.66 87.910 38.750 4246.17 4312.77 12811.49 88.150 38.160 4247.68 4314.28 12861.12 89.450 39.000 4248.72 4315.32 12881.61 91.540 39.450 4248.54 4315.14 12950.00 91.540 39.450 4246.70 4313.30 Local Coordinates Northings Eâ$tings (ft) (ft) 8993.69 N 9027.99 N 9066.78 N 9082.65 N 9135.44 N 1214.46W 1187.22W 1156.28W 1143.32 W 1099.88 W All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 353.320° (True). Magnetic Declination at Surface is 25.734°(29.Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.000., The Bottom Hole Displacement is 9201.41ft., in the Direction of 353.135° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 12950.00 4313.30 9135.44 N 1099.88 W Projected Survey 28 October, 2002 - 15:25 Page 70f8 Global Coordinates Northlngs Eastlngs (ft) (ft) 6008918.84 N 6008953.38 N 6008992.44 N 6009008.42 N 6009061.59 N 564377.45 E 564404.39 E 564434.99 E 564447.80 E 564490.78 E BPXA Dogleg Rate (0/100ft) Vertical Section Comment 1.525 9073.90 1.452 9104.80 3.118 9139.73 10.434 9153.98 0.000 9201.36 Projected Survey -' ---------"-""--'~---'~.-~'------'"-"'-----'--- DrillQuest 3.03.02.002 Sperry-Sun}!~t}jj;, ,,', IKtlces Survey Report for MIlne: ' '~'.S.29 MwD Your Ref:APr~11Øl1 Job No. AKMW22160, suMiytd: 9 OCtober, 2002 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Survey too/ørogram for MPS-29 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Déscription 0.00 178.00 0.00 178.00 178.00 12950.00 178.00 AK-1 BP _HG ' 4313.30 MWD Magnetic '~' ~ --_.._~....-.------------- ---_..._-----~- ---~""-"'+~'---'-~-'----'-- _.~->_._.".~----- 28 October, 2002 - 15:25 Page 8 of8 DrilfQuest 3.03.02.002 MPS-29 Cement Job ) J Subject: MPS-29 Cement Job ~,<!) 2,.., ~, I'iS Date: Wed, 9 Oct 2002 17:17:34 -0500 From: "Green, Matt D" <GreenMD@BP.com> To: "Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us> Winton, Just a note to inform you of the cement job on MPS-29. 7.625-in casing was run to 9,237-ft. After cleaning the annulus, 10-bbl water, 50-bbl Alpha spacer, then the 10.7-lb/gal Permafrost L lead cement was pumped. After 1,150-bbl, we started to see the red dye in the spacer at surface. At 1,300-bbl we lost returns and pumped and additional 51-bbl of lead cement before pumping 123-bbl 15.8-lb/gal Premium tail cement. A top job was then performed. 1.0-in tubing was run to 115-ft, that is just below the base of the conductor, and could not be run further. The tubing was picked up and green cement was plugging the tubing. The tubing was then run to 110-ft and 34-bbl lead cement was pumped with 3-bbl return to surface. We are therefore confident of a good intermediate casing cement job to surface. Please call if you have any further questions, Cheers, Matt Matthew D Green Drilling Engineer BP Exploration Alaska, PO Box 196612 Anchorage AK 99519-6612 (W) +1 (907) 564 5581 (M) +1 (907) 529 8501 (F) +1 (907) 564 4441 MB 4-1 ~ v ') I AI1ASIiA OIL AM) GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 P at Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit MPS-29 BP Exploration (Alaska), Inc. Permit No: 202-195 Surface Location: 3270' NSL, 340' WEL, Sec. 12, T12N, R10E, UM Bottomhole Location: 1899' NSL, 1419' WÈL, Sec. 35, T13N, R10E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). ~ Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this.1.b.- ~ay of Sep'tember, 2002 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. Hole 42" 9-7/8" 6-1/8" " STATE OF ALASKA"\ ALASKA¡",Æ. AND GAS CONSERVATION COMMlvSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well IJ Exploratory IJ Stratigraphic Test II Development Oil IJ Service IJ Development Gas IJ Single Zone IJ Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE= 68' Milne Point Unit / Schrader 6. Property Designation Bluff ADL 025518 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-29 Number 2S100302630-277 9. Approximate spud date~ ~~~~:~o~::~~n !lerty 15. ;::~:~::~~~Oand TVD) 2560 13023' MD / 4331' TVD 0 17. Anticipated pressure {sye 20 AAC 25.035 (e) (2)} 94 Maximum surface 1692 psig, At total depth (TVD) 4181'/1880 psig Setting Depth T QO Botom Quantity of Cement MD TVD MD TVD (include staae data) / Surface Surface 112' 11æ. 2ß&¡sx Arctic SJ*"fApprox.) Surface ,~url~- 9389' .(41fW~~ PF 'L'~54o-ix Class 'G' / 9289' r:~ 13023' 4331 ncementefLSlétted Liner il-r'llfr;o ~ I' ~A- v..t<;A- lJ.t~A-. 1/lS/0 "l- ~.. /(-4~ 1 a. Type of work II Drill IJ Redrill IJ Re-Entry IJ Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4568' NSL, 3870' WEL, SEC. 01, T12N, R10E, UM (OB) At total depth 1899' NSL, 1419' WEL, SEC. 35, T13N, R10E, UM (OB) 12. Distance to nearest property line 13. Distance to nearest well / ADL 380109,1899' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 433' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casina Weiaht Grade Couolina 20" 92# H-40 Welded 7-5/8" 29.7# L-80 BTC 4-1/2" 12.7# L-80 BTC 11. Type Bond (See 20 AAC 25.025) Lenath 80' 9389' 3734' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD r, .. ~~ .t!W'f! F Perforation depth: measured true vertical 20. Attachments II Filing Fee IJ Property Plat IJ BOP Sketch IJ Diverter Sketch II Drilling Program II Drilling Fluid Program IJ Time vs Depth Plot IJ Refraction Analysis IJ Seabed Report IJ 20 AAC 25.050 Requirements Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Sandra Stewman, 564-4750 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Pat Archey. P ;<~{~~;;ii#:d¡i',¡;;~~~~~:~~.;~ß~...",.8;;.~::~;:.(.~é;( OJ. Permit Number API Number ' , Ap~oval Dct~ f) See cover letter 202.- /7>5" 50- 02. 7'- 2.:5 / / 7 l1'J\ll U 0"\ for other requirements Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Réc.uired 0 Yes ß No Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required C8I Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: -reS t- ßo () E- fo 4-0(90 P u. . ORIGiNAL SIGNED BY 0 Tavlor Seamount "Cp-rn~iS~iOl'Jer f r ¡ ~,l \ Approved B~ Form 10-401 Rev. 12-01-85 by order of the commission Date q 9)/ C ()'Ä SutYnit 1;;1- ¡plicate ~ , Milne ~,\,t MPS-29 Well Permit ) IWell Name: I MPS-29 / Drill and Complete Plan Summary I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "08" 20091 FNL, (32701 FSL), 340' FEL, (49391 FWL), SEC. 12, T12N, R10E E=565670.94 N=5999936.18 7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E E=562082 N=6006484 Z=4161' TVD 33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E E=564514 N=6009115 Z=4271' TVD 7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E E=562082 N=6006484 Z=4189' TVD 33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E E=564514 N=6009115 Z=4250'TVD 33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E E=564514 N=6009115 Z=4331' TVD 1 AFE Number: 1 I Ria: 1 Doyon 141 / 1 1 Estimated Start Date: 1 SEP 29,2002 1 I Operatina days to complete: 113 1 1 MD: 113023 1 1 TVD: 14331 1 1 Max Inc: 194 1 KOP: 1'433 1 1 KBE: 168 1 1 1 Surface Location: Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "08" Target Location: BHL "08" Well TD TOTAL DEPTH I Well Desian (conventional, slim hole, etc.): 1 Conventional Grass.Roots ML Producer r Objective: I Schrader 08 Sand Mud Program: 9-7/8" Surface Hole Mud Properties: Density (ppg) Funnel visc YP 8.6 - 9.20 / 75 - 150 25 - 60 Spud - LSND Freshwater Mud pH API Filtrate LG Solids < 6.5 HTHP N/A 9.0-9.5 <8 6-1/8" Production Hole Mud Properties: KCL-CaC03 Flow Pro Density (ppg) Funnel visc YP HTHP pH API Filtrate LG , Solids 8.6 - 9.20 / 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D5-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. 1 ') Milne Pr" ) MPS-29 Well Permit Cement Program: Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below aSlS permafrost Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location. Total Cement Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg Spacer 50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50 ppg / Lead 45 sx }0.7Ib/gal Class L - 4.15 cuft/sx (cement to surface) Tail 1540-~x 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 3496' Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton Evaluation Program: 9 7/8" Hole Section: Open Hole: Cased Hole: 6-1/8" Hole section: Open H91e: MWD/GRlRES IFRlCASANDRA N/a MWD/GRlRES ABI/IFRlCASANDRA Formation Markers: Formation Tops MDrkb TVDßb . Estimated EMW (ft) (ft) Pore Pressure (pSI) (lb/gal)* Base Permafrost 1,812 1,706 767 8.65 Top Ugnu 3512 1579 8.65 TopUgnuM NA Bottom U gnu NA NA NA 3969 1785 8.65 NB NA 3996 1797 8.65 NC NA 4026 1810 8.65 NE NA 4043 1818 8.65 NF NA 4091 1840 8.65 '\,\.- Top OA NA 4122 1854 8.65 Base OA NA 4147 1865 8.65 Top OB NA 4181 1880 8.65 TD 13023 4312 1939 8.65 2 . '~) Casing/Tubing Program: Milne pr')MPS-29 Well Permit Hole Csg I Size Tbg O.D. 42-in 20-in* 92# 9.875-in 7.625-in 29.7# 6.125-in 4.5-in 12.7# 6.125-in 4.5-in 12.7# *The 20" casing is insulated Wt/Ft Grade Conn Length Top / MD/TVDdb H-40 Welded 80-ft 0 L-80 I BTC 9389- ft 0- ft L-80 BTC-932t1..ft 9100-ft /4,208-ft L-80 BTC /3,734-ft 9289-ft /4,227-ft l) 3<>¡aLJ' , Bottom MD I TVDrkb 112-ft / 112-ft 9389-ft / 4191-ft 13024-ft / 4271-ft 13023-ft / 4,331-ft ? I Recommended Bit Program: BHA 1 2 3 Hole Size 9.875-in 9.875-in 6. 125-in Depth (MD) Bit Type Nozzle/Flow rate 3-15 & 1-10 TBD 3 -12 0 - 2,000-ft 2,000 - 9389-ft 9100-ft - TD Hughes MXC-1 TBD Security FM2643 Well Control: . Production hole will be drilled with a diverter. / Surface Interval . Maximum anticipated BHP: . Maximum surface pressure: 1880 psi @ 4181' TVDrkb - Top of "OB" 1692 psi @ su rface ./ (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) Diverter will be function tested. BOP's:Test annular 250 psi low/ and 2500 psi high, and rams to 250 psi low and 4,000 psi high. N/A 9.2 ppg NaCI / 6.8 ppg Diesel . Planned BOP test pressure: . . Kick tolerance: . Planned completion fluid: Drilling Hazards & Contingencies: Hydrates . Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. . Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being 3 :) Milne pr oJ MPS-29 Well Permit circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation . We do not expect losses while drilling this well. . Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures . It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. / Pad Data Sheet . Please Read the S-Pad Data Sheet thoroughly. Breathing . N/A Hydrocarbons . Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults . NA Hydrogen Sulfide I . MPS Pad is not designated as an H2S Pad. / Anti-collision Issues . MPS-29 has no anti-collision issues. 4 I') DRILL & COMPLETION PROCEDURE Milne pr.')MPS-29 Well Permit Pre- Rig Operations 1. The 20" insulated conductor is installed Procedure / 1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe 2. Drill 9-7/8" surface hole as per directional plan. 3. Condition mud prior to 7 5/8" casing run. POOH / 4. Run and cement 7 5/8" casing from TD to surface. 5. ND Diverter 6. Install FMC 11" 5m horizontal wellhead 7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250 low and 4000 psi high /' 8. Drill 6-1/8" OB horizontal production hole as per directional plan. 9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. --- 10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. a. RIH. Orient and set whipstock to place window at top of the OA interval. b. Shear off and mill window thru 7-5/8" casing. 11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud properties and POOH. 12. MU whipstock retrieving tool and pull whipstock 13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing /' 14. POOH 15. Till and displace out drilling mud with 9.2 ppg NaCI 16. POOH 17. Run in hole with 4-1/2" jet pump completion as per schematic / 18. Land tubing hanger and test 19. Set BPV 20. ND BOP 21. Install and test tree 22. Pull BPV 23. Drop ball and set production packer 24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi / 25. Freeze protect thru GLM 26. Install BPV and secure the well 27. RD/MO 5 ~ ~ ~<::::: .~ 9-7/8"Hole . " \ ~'- ----- '-- '-- -- OB Horizontal 6-1/8" hole ------- 112' 9.2 KGI with corrosion inhibitor as packer fluid Jet Pump Installed in Sliding Sleeve Post rig! III .¡" .., , , 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing ID: 6.875 Coupling 00: 8.5" Burst: 6,890 psi Collapse: 4,790 psi Window in 7" casing @ 9,100' MD Well Inclination @ Window = 87 Degrees 7.625" Casing Shoe @ 9,389' MD Well Inclination @ Shoe = 90 Degrees PBTD TD DATE 130 Sep 02 COMMENTS Level 3 Multi-Lateral, 4-112" Jet Pump Completion REV. BY SKC KB. ELEV =66.5' Cellar Box ELEV = 38.0' ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD, RP shear valve open position 4-1/2",12.6 Iblft, L-80, IBT-M Coupling 00: 5.2" Drift/lD: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi "BIW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down to lower sensor) ./ Halliburtion Oura Sleeve XO WIX Nipple (3.813" 10) Phoenix Pressure Gauge (2.840" ID) .....-.- I Set @ 8,950' MD, 4150' TVD I 7-5/8" x 4-1/2" S-3 Packer 3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod Wireline Entry Guide \~ ....... Multi-Lateral Junction 9,100' 6-1/8" OA Lateral TO 13,024' 6-1/8" OB Lateral TO 13,023' ~- - - - - - - OA Horizontal 6-1/8" hole r-- -- - - - - - - - - 4-1/2" Slotted Liner W/Hookwall hanger - - - - 4-1/2" Slotted Liner & Hanger I) 01..-) Milne Point Unit WFI I : MPS-?9 API NO: ~'4 -Y-8U1 BPXA v,,~n 1811ti..,.,:Y'Lø Milne Point Unit ~~~ìD...1IV Proposal Data for MPS-29 6.0 ~~~~t~æ~~\n : Measurement Un~s : North Reference : Well Well ft True North =1 =~ ~roolh: ~3~per 100 feet (US) Venical Section Desc""tion: Well Vertical Section Origin: 0,00 N,O,oo E M...ured IncL Azlm. Vertical Horthlngs Elating. V.rtlcal DogI.g Deplh Depth Secllon Rat. 0,00 0,000 O,SQ4 0,00 '''.IN O,OOE 0,00 300,00 0,000 0,504 300.00 "'.IN O,OOE 0,00 0,000 433,33 2,000 326,000 433.30 I .~ ~ N \.3OW 207 \.500 1451.52 30,000 326,000 1402,34 -' 'IN 156,68 W 248.94 2,750 1908,66 38,000 326,000 178\.02 ......i)N 299.51 W 475,87 \.750 2036,81 38,000 326,000 1882,00 ":,,'..aiN 343,63 W 545,97 0.000 2859,24 70,680 330.850 2355,16 /I- . "~N 683.62 W 1146.08 4.000 8061.36 70,680 330,850 4076,25 ~ '..1 _i N 3074,86W 568254 0.000 8061.97 70.680 330,850 4076,46 -!P.I :iN 3075,14 W 5683.07 0,000 8488,71 87,650 332,735 4156.39 "".-IN 3272.34W 6071.60 4,000 8707,16 87,650 332,735 4165.35 a.~:. II~ N 3372.33 W 6275,93 0,000 9388,33 88,000 0,000 419\.70 r:. J. IlN 353\.23 W 6945,23 4,000 9805,78 88,795 50,109 4204,18 ",'.,I".11N 3360,07 W 7288.88 12000 10049.79 88.795 50,109 4209.31 '1111 r.lN 3172.90 W 742250 0.000 10114,95 87,000 52,000 4211,70 =1-1. "'oII)N 3122,26 W 7457,26 4,000 10188.32 85.432 54,487 4216.54 ",..,.. .."5N 3063,61 W 7493,95 4,000 10554.43 85.432 54,487 4245,70 ""II ..,N 2766.55 W 7669,95 0,000 10720,92 87,000 48,000 4256,70 ',,"' "IN 2637,08 W 7758,13 4,000 10756,05 87,554 46,707 4258.37 ",.,,,7N 261\.27 W 7778,74 4,000 11262.53 87,554 46,707 4279,98 ,,,:",.;N 2242,96 W 8080.53 0,000 11306.37 87,960 45.000 428\.70 ,... 7 N 221L53 W 8107,17 4,000 11320,20 87,961 44,447 4282,19 '-'I' '-)N 2201.81 W 8115,79 4,000 11904.84 87,961 44,447 4302,99 !""'"')N 1792,67 W 848248 0,000 12027,00 88,562 39,595 4306,70 "-1 I ')N 1710,96 W 8563,05 4,000 13023.26 88,562 39.595 4331.70 '!C" ,,~ N 1076,19 W 9251.45 0,000 0 ~In Dlr 0 1.500'/1ooft: 300.00ft MD. 300,00ft lVD Ifr Rate Increase 0 2,750'/1ooft: 433,33ftMD,433.30ftlVD 700.00 1250 - ecrease In Dlr Rate 0 1.750'/100ft: 1451 ,52ft MD, 1402,34ft lVD 14.ðO,00 ã> ~ .c ã. Q) 0 ~ 2500 - t Q) > nd Dlr, Start Sail @ 38.000': 1908,66ftMD.1781.02ftTVD gin Dlr 0 4.0oo'/1ooft: 2036.81ft MD, 1882.ooftlVD ã> ~ 5000 - en C) c:: :ë 1::: 0 Z =: 0 0 I() C\I II .c 0 .£ Qj ¡Erd Dlr, Start Sail 0 70,680': 2859.24ftMD,2355.16ftlVD ~ Z8f'OO en 3500.00 4200,00 Ë I() C\I 7, 3750 - .c 0 .£ Qj ~ en 0 Scale: 1 inch = 1250ft I 1250 I 2500 DriIlQuesI2,QO.09,008 4900,00 _5600,00 I 3750 Milne Point MPSDrillll"est'" MPS-29 WP 7.0 I::astings (Well) Scale: 1 inch = 25000 -2500 I 0 I b "?~ ....~~ Z' E'IC) [''', .'a" ;,<"t oW ...,. ,,:": 12027,00IIMD,4306.7011lVD t-r.':J. ~f\--III' lll. .¡J;..I{...I'I.í"ln 11904.84ftMO,4302.99ftTVD $-'"' ,'. ::: -E :~-~'~,,:" ~',~~ '::",;,~r;:~~;" 'f1~~~~~,4282.19ftTVD .".. "E"o'd'U ÚI, .. , '2' (, '''''.' "¿' 1.5311 MD, 4279.981t TVD U""::.::'P r.s 4."M ¡II T\fLJ ?!~I ¡.~ ~ ::~11.53W l~:n[~[",: ;nJ ;¡',:I, ~II~~-~I.-":II;_.~"';I~~ '~8~~~W~ ...v ~~~I ~~'i ;.~~';'~~'.I T~;-.~:'-::" ,II t~rl:~~,~~~I~D,4245.7QftTVD nd~~~ .f1::n~-~'lt~lt~I-~~~. I~:~~~ ~:~..~~f~;-:~"~':J~D MPS.29'. ...:', ;,¡,r"J[' ;I~: : tJ _Lt..::-... "'-1 ~rRatell"k.l~"'_=' G I"': 'It II' flt..n '.10.1),. -ljHMLJ..1191.7OftTVD MPS-29T1 418 ,<r"173,194191 ,70 T\ID. 6579,12 N. 3531,23 W --Begin Dlr @ 4.000'¡1ooft : 8707.16ft MD, 4165.3511 TVD rd Dir, Start Sail @ 87.650' : 8488.71ftMD,4156.39ftlVD ~~!~~~~~~~rsD64~~\l;!¡!~~ 7500 - ~ 2500 - n Dir 0 4.000'/1ooft : 8061.9711 MD, 4076.46ft TVD MP8-29 Purrp T algel- 900.004076,46 T\ID. 5361,75 N. 3075,14 W 0- Begin Dlr @ 4.000'/100II :2036.8111 MD, 1882,00II TVD '00 Dlr, Start Sail 0 38.000': 1908,66ftMD,178L02ftTVD crease in Dir Rate 0 1.750'/10011: 1451.52ft MD, 1402.3411 TVD ~~~I!r¡r~~~~1~~'~&it '\rr¡~8Ófffv:rrlVD ~<::) ~<::) ~<::) ~ "'~ .j.<::) ~ ~<::) ~~ ,g.~ ~ ~,. .¡¡:.-~ ~ -<;:\<::) ~<::)~<::) ~<::) ~~<::) #'0' ,~. ~~ ~~" "",:-'0 'þ~ ""ro1- "'~ ~~ ~,~ ¡§> ~~ ~' ~~ ...,~ rÇ>~ ~c6J ~~ ~~ ~'o' þ'b (\~~ rh"" ¡g,~ S)'o' ~~ ,~ ~' ¡¡,. ~<::)~, ~ ~~, -&' {P {:J {:J ,9> ¡¡,"f. ,~~ .';'JcgJ ~,!-'8<f"~-J<~ ~<::)~~~ ~~~' ~St~' .,!,~ ,.'lfé' !;)~ .~'b~~'S ,~~ ~~~<lP' '9c§:- ~'Y <#'~~ r§> 9.P.'!' o\~ ~ . ,,(3' tf'. <§"."~ t{J>"',,~ #....~ \,,<;$ (I" ~ r§> ~r§J "'<¡¡"":'...":J'." I~' ,,"- ,'. ,,'" '. r§J<!.@'b 0\,,<;$ ~. <{J>~,,~\)'~'~' rov~' ~t$- '.ro'o<f, @).. <# ~';:P fb @ ~ ~<!.\ ~ @ !S~@ (} ~\~ .¡¡.. \"#'b'b' Q> #~ ~@.... ,,~~ l~).'l'~",~ <#...~ <#0 ~~@ ...~ ~,~ -s: ~~ ~ @ ~ 0 ~~ @).~ 0<:$ ~ ~ ~0~, Q ~, Q> ~ ~ <¿,..:? ~ <¿,..:? 7700,00 j t~/,¡i "l~<é' t:.?b ~vi~ ($? b<1>~~ QQ>' ~ Q~, Total Depth: 84000 ¡~~~ ~~",b/J~_~b 13023,26ftMD, - t' 9100,00 "Ð , 1n V v Ml'S-29L1WP3.0 4331.70ftTVD . S T2 - . 1nn MIIIK-'O 8' MPS.29 T6 MPS.29 T1 ~ 70 T\ID ~..., ¿ ÞS-!!9 I r; . 4331,70 T\ID. 41111,70 T\ID. 71<12.5$N, 31u.æ W MPS-2IIT3 .. 4281,70T\ID, ~ MPS.29T5 11188,64 N, 1076,19 W 6579,12 N, 353123 W 4250.70 T\ID, 71103,57 N, 2211.53 W 4308,70 T\ID. 7~30 N 2637,08 W /6421.111 N. 1710,116 W 6250 7500 8750 10000 Section Azimuth: 353.320° (True North) ,~ 6300.00 ]000.00 MPS-29 PuIr9 Target- 4076.46 TVD, 5361.75 N, 3075.14 W I 5000 Vertical Section (Well) BP EXPLORA TION int Unit A n MPS, Slot MPS-29 MPS-29 6.0 Revised: 11 September, 2002 PROPOSAL REPORT 11 September, 2002 Surface Coordinates: 5999936.18 N, 565670.94 E (70024' 36.9759" N, 149027' 54.9398" W) Surface Coordinates relative to Project H Reference: 999936.18 N, 65670.94 E (Grid) Surface Coordinates relative to Structure: 32.89 S, 674.38 W (True) Kelly Bushing: 66. 70ft above Mean Sea Level - .. .y......., aJ!Iq;.-';J!I1I::'::=:.~~'lÇ;'.J.I "'!~~,Qi#.~ ~ ,~ß Proposal Ref: pro10181 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Depth (ft) 0.00 300.00 400.00 433.33 500.00 Incl. Azim. 0.000 0.000 0.000 0.000 1 .500 326.000 2.000 326.000 3.833 326.000 600.00 6.583 326.000 700.00 9.333 326.000 800.00 12.083 326.000 900.00 14.833 326.000 1000.00 17.583 326.000 1100.00 20.333 1200.00 23.083 1300.00 25.833 1400.00 28.583 1451 .52 30.000 1500.00 1600.00 1700.00 1800.00 1900.00 Sub-Sea Depth (ft) -66.70 233.30 333.29 366.60 433.18 532.76 631 .79 730.04 827.28 923.30 1908.66 38.000 326.000 2000.00 38.000 326.000 2036.81 38.000 326.000 2100.00 40.502 326.572 2200.00 44.466 327.366 11 September, 2002 - 13:27 1377.44 1462.50 1545.91 1627.60 1707.49 1714.32 1786.30 1815.30 1864.23 1937.96 Sperry-Sun Drilling Services Proposal Report for MPS-29 6.0 Revised: 11 September, 2002 Vertical Depth (ft) 0.00 300.00 399.99 433.30 499.88 599.46 698.49 796.74 ,~~~;~*:",- 893.98è;/ - :~- ;,. ,: t~pO:'M;,~;/~':» .. Y08~~56, , ->1171,4$:,'. ~, - 126~t4'8 1357.41 1402.34 1444.14 1529.20 1612.61 1694.30 1774.19 1781.02 1853.00 1882.00 1930.93 2004.66 Local Coordinates Northin9s Eastin9s (ft) (ft) O.OON O.OON 1.09N 1.93 N Global Coordina Northin9s (ft) O.OOE 0.00 E 0.73 W i~9993'l.26N 599993$; 10 N 5999~;8;~ ~~"936.18"' ,'''- 108.51 N 139.17 N 173.49 N 211.39 N 232.29 N 252.64 N 296.23 N 341.96 N 389.77 N 439.63 N 444.05 N 490.67 N 509.45 N 542.71 N 599.33 N 73.19 W 93.87 W 117.02 W 142.59 W 156.68 W 170.41 W 199.81 W 230.65 W 262.90 W 296.54 W 299.51 W 330.96 W 343.63 W 365.82 W 402.61 W Page2of9 -~1&> 5999940.89 N 5999948.37 N 5999959.78 N 5999975.09 N 5999994.27 N 6000017.27 N 6000044.04 N 6000074.52 N 6000108.64 N 6000146.31 N 6000167.08 N 6000187.32 N 6000230.65 N 6000276.10 N 6000323.63 N 6000373.19 N 6000377.57 N 6000423.92 N 6000442.59 N 6000475.65 N 6000531.95 N -:(~l'1'~ BPXA Milne Point MPS ~!};:.;;;D'Oø!ê9 iP:, Vertical " '- RatØ~~ Section ./100ft) ~/ Comment 565670.20 E 565669.62 E 565667.70 E 565662.56 E 565654.72 E 565644.19 E 565631.01 E 565615.20 E 565596.80 E 565575.85 E 565552.40 E 565526.50 E 565512.22 E 565498.31 E 565468.53 E 565437.29 E 565404.62 E 565370.55 E 565367.53 E 565335.68 E 565322.84 E 0.000 1.500 1.500 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 2.750 1.750 1.750 1 .750 1.750 1.750 1.750 0.000 0.000 565300.37 E /' 4.000 565263.08 E 4.000 0.00 0.00 Begin Dir @ 1.5000/100ft: 300.00ft MD, 300.00ft TVD 1.16 2.07 Dir Rate Increase @ 2.7500/100f\~ 433.33ftM D ,433.30ftTVD 5.08 13.15 25.45 41.95 62.63 87.43 116.29 149.15 185.93 226.55 248.94 Decrease in Dir Rate @ 1.7500/100ft: 1451.52ft MD, 1402.34ft TVD 270.75 317.47 366.47 417.71 471.14 ~ 475.87 End Dir, Start Sail @ 38.000° : 1908.66ftMD,1781.02ftTVD 525.83 545.97 Begin Dir @ 4.0000/100ft: 2036.81ft MD,1882.00ftTVD 581.58 642.10 DrHlQuest 2.00.09.008 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Depth (ft) Incl. Azim. 2300.00 48.435 328.056 2400.00 52.408 328.666 2500.00 56.383 329.213 2600.00 60.361 329.713 2700.00 64.340 330.174 2800.00 68.321 330.606 2859.24 70.680 330.850 2900.00 70.680 330.850 3000.00 70.680 330.850 3100.00 70.680 330.850 3200.00 70.680 3300.00 70.680 3400.00 70.680 3500.00 70.680 3600.00 70.680 3700.00 70.680", 3800.00 70.680 3900.00 70.&80 4000.00 7Ò~680 4100.00 70.680' 330.850 330.850 330.850 330:8~91.>" 3~Cðet.!<!1i¡' .- 'I '.. 330J~5(f' 330.$50 "$30.850 " 330~850 , ',: 330.850 4200.00 70.680 330.850 4300.00 70.680 330.850 4400.00 70.680 330.850 4500.00 70.680 330.850 4600.00 70.680 330.850 4700.00 70.680 330.850 4800.00 70.680 330.850 4900.00 70.680 330.850 5000.00 70.680 330.850 5100.00 70.680 330.850 11 September, 2002 - 13:27 Sub-Sea Depth (ft) 2006.85 2070.55 2128.76 2181.19 2227.58 2267.72 2288.46 2301.95 2335.03 2368.12 Vertical Depth (ft) 2073.55 2137.25 2195.46 2247.89 2294.28 2334.42 2355.16 Sperry-Sun Drilling Services Proposal Report for MPS-29 6.0 Revised: 11 September, 2002 Local Coordinates Northings Eastings (ft) (ft) 660.60 N 726.21 N 795.85 N 869.17 N 945.83 N 441.31 W 481.72 W 523.65 W 566.90 W 2368.65 2401.73 -{~'Jt':, '. ;~~:l;Ä.L;:î354.69 N to' ~1437.10N 1519.52 N 1601.94 N 1684.35 N 2599.71 2632.79 2665.88 2698.96 2732.05 2765.13 2798.22 2831.30 2864.38 2897.47 2930.55 2963.64 2996.72 3029.81 2633.32 2666.41 2699.49 2732.58 2765.66 2798.75 2831.83 2864.92 2898.00 2931.08 2964.17 2997.25 3030.34 3063.42 3096.51 1766.77 N 1849.19 N 1931.60 N 2014.02 N 2096.43 N 2178.85 N 2261.27 N 2343.68 N 2426.10 N 2508.52 N 2590.93 N 2673.35 N 2755.77 N 2838.18 N 2920.60 N 840.25 W 886.22 W 932.19 W 978.15 W 1024.12 W 1070.09 W 1116.05 W 1162.02 W 1207.99 W 1253.95 W 1299.92 W 1345.89 W 1391.85 W 1437.82 W 1483.79 W 1529.75 W 1575.72 W 1621.69 W 1667.65 W 1713.62 W P8ge30f9 Global Coordina Northings (ft) ,~- 6000~.6T1'J ,~'~:~~',~, c':~00åQ{).33 N,' 6ØQ081ß:60 N :r~,;'. . --'~:~ -.~~~.". 6000955.81 N 6001003.97 N 6001037.40 N 6001119.41 N 6001201.42 N 6001283.43 N 6001365.43 N 6001447.44 N 6001529.45 N 6001611.46 N 6001693.47 N 6001775.48 N 6001857.49 N 6001939.50 N 6002021.51 N 6002103.52 N 6002185.53 N 6002267.54 N 6002349.54 N 6002431.55 N 6002513.56 N 6002595.57 N 6002677.58 N 6002759.59 N 6002841.60 N 565005.46 E 564977.91 E 564958.88 E 564912.19 E 564865.50 E 564818.81 E 564772.12 E 564725.43 E 564678.74 E 564632.05 E 564585.36 E 564538.67 E 564491.98 E 564445.29 E 564398.60 E 564351.91 E 564305.22 E 564258.53 E 564211.84 E 564165.15 E 564118.46 E 564071.77 E 564025.09 E 563978.40 E 563931.71 E _~~~f~11~. '~--~o:=~f,:: :~~~~ , /100ft) 4.000 707.45 4.000 777.31 4.000 851.36 4.000 929.22 4.000 1010.51 BPXA Milne Point MPS Comment ~ 4.000 1094.85 4.000 1146.08 End Dir, Start Sail @ 70.680° : 2859.24ftMD,2355.16ftTVD 0.000 1181.62 0.000 1268.82 0.000 1356.03 0.000 1443.23 0.000 1530.44 0.000 1617.64 0.000 1704.85 0.000 1792.05 0.000 1879.25 0.000 1966.46 0.000 2053.66 0.000 2140.87 0.000 2228.07 0.000 2315.27 0.000 2402.48 0.000 2489.68 0.000 2576.89 0.000 2664.09 0.000 2751.30 0.000 2838.50 0.000 2925.70 0.000 3012.91 0.000 3100.11 ~! DrlllQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MPS-29 6.0 Revised: 11 September, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit ,,,,~~. Milne Point MPS --, Measured Sub-Sea Vertical Local Coordinates Global Coordina ":~,~;"D~=~"~ '~'f':~~~~ Depth Incl. Azim. Depth Depth Northings Eastings Northings Comment (ft) (ft) (ft) (ft) (ft) (ft) ''';/1 OOft) ~~(-~ 5200.00 70.680 330.850 3062.89 3129.59 3003.02 N 1759.59 W 6002923XiHt.I 56 0.000 3187.32 5300.00 70.680 330.850 3095.97 3162.67 3085.43 N 1805.55 W ;,æ:~~l 5638 .3E 0.000 3274.52 5400.00 70.680 330.850 3129.06 3195.76 3167.85 N 1851.52 W 563791.64 E 0.000 3361.72 5500.00 70.680 330.850 3162.14 3228.84 3250.27 N 1897.49 W 563744.95 E 0.000 3448.93 5600.00 70.680 330.850 3195.23 3261.93 3332.68 N 1 6Ö932$:f~65 KI 563698.26 E 0.000 3536.13 ~ -"r'::,~"'.~-" ~¡ci"ii'..~" 5700.00 70.680 330.850 3228.31 3295.01 6003333.66 N 563651.57 E 0.000 3623.34 5800.00 70.680 330.850 3261.40 3328.10 6003415.66 N 563604.88 E 0.000 3710.54 5900.00 70.680 330.850 3294.48 3361.18 6003497.67 N 563558.19 E 0.000 3797.75 6000.00 70.680 330.850 3327.57 3394.27 6003579.68 N 563511.50 E 0.000 3884.95 6100.00 70.680 330.850 3360.65 3427.35 6003661 .69 N 563464.81 E 0.000 3972.15 6200.00 70.680 330.850 3460.43' ' '3827.18 N 2219.25 W 6003743.70 N 563418.12 E 0.000 4059.36 6300.00 70.680 330.850 3493.52 ' 3909.60 N 2265.22 W 6003825.71 N 563371.43 E 0.000 4146.56 6400.00 70.680 330.850 '3526..60 3992.02 N 2311.19 W 6003907.72 N 563324.74 E 0.000 4233.77 6500.00 70.680 330.850 3559~69 ' 4074.43 N 2357.15 W 6003989.73 N 563278.05 E 0.000 4320.97 6600.00 70.680 330.850 3592.77 4156.85 N 2403.12 W 6004071.74 N 563231.36 E 0.000 4408.17 .0t1iJ~!~?, 6700.00 70.680 38Q;850 ",;' 3625.86 4239.26 N 2449.09 W 6004153.75 N 563184.67 E 0.000 4495.38 6800.00 70.68Cl:;," 33().$~:\' 3 3658.94 4321.68 N 2495.05 W 6004235.76 N 563137.98 E 0.000 4582.58 6900.00 70.680:'~33Ó.85b 3625.33 3692.03 4404.10 N 2541.02 W 6004317.77 N 563091.29 E 0.000 4669.79 7000.00 70~680" '330.850. 3658.41 3725.11 4486.51 N 2586.99 W 6004399.77 N 563044.60 E 0.000 4756.99 7100.00 1Ø~68o. ,.:' 330.850 3691.49 3758.19 4568.93 N 2632.95 W 6004481.78 N 562997.91 E 0.000 4844.20 7200.00 70.6$0 330.850 3724.58 3791.28 4651.35 N 2678.92 W 6004563.79 N 562951 .22 E 0.000 4931.40 7300.00 70.680 330.850 3757.66 3824.36 4733.76 N 2724.89 W 6004645.80 N 562904.53 E 0.000 5018.60 ~ 7400.00 70.680 330.850 3790.75 3857.45 4816.18 N 2770.85 W 6004727.81 N 562857.85 E 0.000 5105.81 7500.00 70.680 330.850 3823.83 3890.53 4898.60 N 2816.82 W 6004809.82 N 562811.16 E 0.000 5193.01 7600.00 70.680 330.850 3856.92 3923.62 4981.01 N 2862.79 W 6004891 .83 N 562764.47 E 0.000 5280.22 7700.00 70.680 330.850 3890.00 3956.70 5063.43 N 2908.75 W 6004973.84 N 562717.78 E 0.000 5367.42 7800.00 70.680 330.850 3923.08 3989.78 5145.85 N 2954.72 W 6005055.85 N 562671.09 E 0.000 5454.62 7900.00 70.680 330.850 3956.17 4022.87 5228.26 N 3000.69 W 6005137.86 N 562624.40 E 0.000 5541.83 8000.00 70.680 330.850 3989.25 4055.95 5310.68 N 3046.66 W 6005219.87 N 562577.71 E 0.000 5629.03 8061.36 70.680 330.850 4009.55 4076.25 5361.25 N 3074.86 W 6005270.18 N 562549.06 E 0.000 5682.54 11 September, 2002 - 13:27 Page4of9 DrHlQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MPS-29 6.0 Revised: 11 September, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit :~ Milne Point MPS " Measured Sub-Sea Vertical Local Coordinates Global Coordina ,~;},D()Qtèg ~~ '" Vèrtical Depth Incl. Azim. Depth Depth Northings Eastings Northings ''-o'~:, Rå$, Section Comment (ft) (ft) (ft) (ft) (ft) (ft) '''~/1 OOft) 8061 .97 70.680 330.850 4009.76 4076.46 5361.75 N 3075.14 W 6005 0.000 5683.07 Begin Dir @ 4.000°/1 OOft : 8061.97ft ,*~~, MD, 4076.46ft TVD ~ ;;..,. .,,,,,,' MPS-29 Pump Target- 8100.00 72.192 331.029 4021.86 4088.56 3092.65 W c~~0530K04~., 562530.99 E 4.000 5716.41 8200.00 76.168 331.486 4049.12 4115.82 3 ~53~~98 N 562483.99 E 4.000 5805.56 ~ 8300.00 80.144 331.927 4069.64 4136.34 60054't1.73 N 562436.86 E 4.000 5896.53 8400.00 84.121 332.358 4083.33 4150.03 6005558.88 N 562389.82 E 4.000 5988.88 8488.71 87.650 332.735 4089.69 4156.39 5 6005637.02 N 562348.34 E 4.000 6071.60 End Dir, Start Sail @ 87.650° : 8488.71 ftMD,4156.39ftTVD 8500.00 87.650 332.735 4090.15 4156.85J"lJf~'t. 5739. 6005647.00 N 562343.09 E 0.000 6082.16 8600.00 87.650 332.735 4094.25 4160.95{{~:.~7:5828.68 6005735.41 N 562296.54 E 0.000 6175.69 8700.00 87.650 332.735 4098.35 :~~;:"<~~:{j~~::; ~ 6005823.82 N 562249.98 E 0.000 6269.23 8707.16 87.650 332.735 4098.65 6005830.15 N 562246.65 E 0.000 6275.93 Begin Dir @ 4.0000/100ft: 8707.16ft MD, 4165.35ftTVD .. '. 8800.00 87.667 336.452 4169;,1'4 6007.63 N 3412.12 W 6005913.58 N 562206.13 E 4.000 6363.77 8900.00 87 .697 3"!o.--~,, 4173.19 6100.55 N 3448.81 W 6006006.17 N 562168.62 E 4.000 6460.32 9000.00 87 .738 ~.458:,\t 4177.17 6195.80 N 3478.92 W 6006101.15 N 562137.67 E 4.000 6558.43 9100.00 87.790:'-' 348:461';' 4181.07 6292.93 N 3502.31 W 6006198.07 N 562113.43 E 4.000 6657.62 9200.00 87;,,853-- ;', ',352A&3 4118.18 4184.88 6391.45 N 3518.87 W 6006296.45 N 562096.01 E 4.000 6757.40 9300.00 81:;~2l" ..: 356.465 4121.86 4188.56 6490.90 N 3528.51 W 6006395.80 N 562085.50 E 4.000 6857.29 9388.33 88~OOO::' 0.000 4125.00 4191.70 6579.12 N 3531.23 W 6006484.00 N 562082.00 E 4.000 6945.23 Dir Rate Increase @ 12.0000/100ft: 9388.33ftMD ,4191.70ftTVD Target - MPS-29 T1 ~ 9400.00 88.003 1.401 4125.41 4192.11 6590.78 N 3531.09 W 6006495.66 N 562082.04 E /12.000 6956.79 9500.00 88.078 13.408 4128.84 4195.54 6689.71 N 3518.23 W 6006594.69 N 562094.02 E 12.000 7053.55 9600.00 88.237 25.413 4132.07 4198.77 6783.80 N 3485.08 W 6006689.08 N 562126.35 E 12.000 7143.15 9700.00 88.473 37.416 4134.95 4201.65 6868.95 N 3433.07 W 6006774.68 N 562177.61 E 12.000 7221.68 9800.00 88.776 49.415 4137.36 4204.06 6941.44 N 3364.49 W 6006847.76 N 562245.55 E 12.000 7285.69 9805.78 88.795 50.109 4137.48 4204.18 6945.17 N 3360.07 W 6006851 .54 N 562249.93 E 12.000 7288.88 End Dir, Start Sail @ 88.795° : 9805.78ftMD,4204.18ftTVD 9900.00 88.795 50.109 4139.46 4206.16 7005.58 N 3287.80 W 6006912.58 N 562321.67 E 0.000 7340.48 10000.00 88.795 50.109 4141.56 4208.26 7069.70 N 3211.09 W 6006977.37 N 562397.81 E 0.000 7395.24 11 September, 2002 - 13:27 Page50f9 DrHlQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MP5-29 6.0 Revised: 11 September. 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit .-:1~ Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordina .,~~~,:'- DogfØg ;(5j"" V~~tical Depth Incl. Azim. Depth Depth Northings Eastings Northings .' R~' 7' Section Comment (ft) (ft) (ft) (ft) (ft) (ft) /1 OOft) 10049.79 88.795 50.109 4142.61 4209.31 7101.62 N 3172.90 W 6007 0.000 7422.50 Begin Dir @ 4.0000/100ft: 10049.79f1 ~., MD,4209.31ftTVD 10100.00 87.412 51.566 4144.27 4210.97 7133.31 N 3133.99 W - p007~ 1.66~r;.I 562474.35 E 4.000 7449.45 10114.95 87.000 52.000 4145.00 4211.70 7142.55 N 3122.26 W <~.Q07Ò$toOM:, 562486.00 E 4.000 7457.26 Target - MPS-29 T2 10188.32 85.432 54.487 4149.84 4216.54 7186.36 N 3 6ØQ709$:33 N 562544.26 E 4.000 7493.95 ~ 10200.00 85.432 54.487 4150.77 4217.47 7193.12 N 60011ð2.17 N 562553.68 E 0.000 7499.57 10300.00 85.432 54.487 4158.74 4225.44 6007160.79 N 562634.31 E 0.000 7547.64 10400.00 85.432 54.487 4166.70 4233.40 6007219.40 N 562714.93 E 0.000 7595.71 10500.00 85.432 54.487 4174.67 4241 .37 6007278.02 N 562795.56 E 0.000 7643.78 10554.43 85.432 54.487 4179.00 4245.70'''~!f,:'"", 6007309.92 N 562839.45 E 0.000 7669.95 End Dir, Start Sail @ 85.432° : 10554.43ftMD,4245.70ftTVD 10600.00 85.856 52.709 4182.46 ,4?~~l6'~;:; -,<)':"Z425.32 N 2729.98 W 6007337.21 N 562875.78 E 4.000 7692.48 " 10700.00 86.800 48.814 lì255~57 â':"7488.43 N 2652.70 W 6007401.00 N 562952.50 E 4.000 7746.17 10720.92 87.000 48.000 .,<--~2~q!l :': 7502.30 N 2637.08 W 6007415.00 N 562968.00 E 4.000 7758.13 Begin Dir @ 4.0000/100ft: 10720.92f1 MD, 4256.70ft TVD Target - MPS-29 T3 10756.05 4258.37 7526.07 N 2611.27W 6007439.00 N 562993.60 E 4.000 7778.74 End Dir, Start Sail @ 87.554° : 1 0756.05ftMD ,4258.37ftTVD 10800.00 8],.55 4260.24 7556.18 N 2579.31 W 6007469.39 N 563025.29 E 0.000 7804.93 10900.00 87 ~'554 4264.51 7624.69 N 2506.59 W 6007538.54 N 563097.40 E 0.000 7864.51 . ~..,:I ',. 11000.00 87':554 ' , 46.707 4202.08 4268.78 7693.20 N 2433.87 W 6007607.68 N 563169.52 E 0.000 7924.10 11100.00 87 .Š~~ 46.707 4206.35 4273.05 7761.71 N 2361.15 W 6007676.83 N 563241.63 E 0.000 7983.68 11200.00 87.554 46.707 4210.62 4277.32 7830.22 N 2288.43 W 6007745.98 N 563313.75 E 0.000 8043.27 Begin Dir @ 4.0000/100ft: 1126~ 11262.53 87.554 46.707 4213.28 4279.98 7873.06 N 2242.96 W 6007789.22 N 563358.84 E 0.000 8080.53 MD, 4279.98ft TVD 11300.00 87.901 45.248 4214.77 4281.47 7899.08 N 2216.04 W 6007815.47 N 563385.53 E 4.000 8103.24 11306.37 87.960 45.000 4215.00 4281.70 7903.57 N 2211.53 W 6007820.00 N 563390.00 E 4.000 8107.17 Target - MPS-29 T4 11320.20 87.961 44.447 4215.49 4282.19 7913.39 N 2201.81 W 6007829.90 N 563399.64 E 4.000 8115.79 End Dir, Start Sail @ 87.961° : 11320.20ftMD,4282.19ftTVD 11400.00 87.961 44.447 4218.33 4285.03 7970.33 N 2145.96 W 6007887.33 N 563454.98 E 0.000 8165.85 11500.00 87.961 44.447 4221.89 4288.59 8041.67 N 2075.98 W 6007959.29 N 563524.33 E 0.000 8228.57 11600.00 87.961 44.447 4225.45 4292.15 8113.02 N 2006.00 W 6008031.24 N 563593.68 E 0.000 8291.29 11 September. 2002 - 13:27 Page6of9 DrHlQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MP5-29 6.0 Revised: 11 September, 2002 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 11700.00 87.961 44.447 4229.00 4295.70 8184.36 N 1936.02 W 11800.00 87.961 44.447 4232.56 4299.26 8255.71 N 1866.04 W 11900.00 87.961 44.447 4236.12 4302.82 8327.05 N 1796.06 W 11904.84 87.961 44.447 4236.29 4302.99 8330.50 N 1792.67 W 12000.00 88.428 40.667 4239.29 4305.99 12027.00 88.562 39.595 4240.00 4306.70 12100.00 88.562 12200.00 88.562 12300.00 88.562 12400.00 88.562 39.595 39.595 39.595 39.595 4241.83 4244.34 4246.85 4249.36 4308.53('!~j",,;. 8477. 4311.04W'o;~~;8554.46 .;~~;'~(y,<;:"':~:~~~::~ ~ i'?i.".:' ~ ~-- :."'~: ,--~\ 12500.00 12600.00 12700.00 12800.00 12900.00 4331.12 4331.70 " ' '- :131.it;!?7~', . ';.7432lXl8 4323.59 4326.10 4328.61 13000.00 13023.26 4264.42 4265.00 , . 8785.55 N 8862.59 N 8939.62 N 9016.65 N 9093.69 N 9170.72 N 9188.64 N Global Coordina Northings (ft) c~ ~4t/jj 60081.Q3:20r~ ~J75.1a~ . ~6Öä~~7 .12l~ :,~08~c~.60 ~é' 6ôf:iš321.21 N 6008342.00 N -:~~~~~~. - " ~':~~~(D~=~~:\Ù :~~~~ o/100ft) 563868.79 E 563886.00 E 6008398.64 N 563932.02 E 6008476.23 N 563995.05 E 6008553.82 N 564058.09 E 6008631.41 N 564121.12 E 1409.59 W 6008709.00 N 564184.16 E 1345.87 W 6008786.59 N 564247.19 E 1282.16W 6008864.18 N 564310.23 E 1218.44 W 6008941 .77 N 564373.26 E 1154.73 W 6009019.36 N 564436.30 E 1091.01 W 6009096.95 N 564499.33 E 1076.19 W 6009115.00 N 564514.00 E All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 25.872° (10-Sep-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 353.320° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13023.26ft., The Bottom Hole Displacement is 9251.45f1., in the Direction of 353.320° (True). 11 September, 2002 - 13:27 Page 70t9 BPXA Milne Point MPS Comment 0.000 8354.01 0.000 8416.73 0.000 8479.45 0.000 8482.48 Begin Dir @ 4.000°/1 OOft: 1190'- MD, 4302.99ft TVD ~ 4.000 8544.58 4.000 8563.05 End Dir, Start Sail @ 88.562° : 12027 .00ftMD,4306.70ftTVD Target - MPS-29 T5 0.000 8613.49 0.000 8682.59 0.000 8751.69 0.000 8820.78 0.000 8889.88 0.000 8958.98 0.000 9028.08 0.000 9097.18 0.000 9166.27 0.000 9235.37 0.000 9251.45 Total Depth: 13023.26ftMD,4331.70ftTVD Target - MPS-29 T6 ~/ DrH/Quest 2.00.09.008 BP EXPLORATION (ALASKA) INC. Milne Point Unit Comments Measured Depth (ft) 300.00 433.33 1451.52 1908.66 2036.81 2859.24 8061.97 8488.71 8707.16 9388.33 9805.78 10049.79 10554.43 10720.92 10756.05 Station Coordinates TVD Northin9s Eastin9s ~ij (ffl ~) 300.00 433.30 1402.34 1781.02 1882.00 2355.16 4076.46 4156.39 4165.35 4191.70 4204.18 4209.31 4245.7Q, 4?56.7Q' 4298.31: , 4~~¡aa , ''A2B2.'t9 ,..99 J4306.70 4331.70 11 September, 2002 - 13:27 O.OON 1.93 N 232.29 N 444.05 N 509.45 N 1073.84 N 5361.75 N 5729.84 N 5923.85 N 6579.12 N 7873.06 N 7913.39 N 8330.50 N 8421.19 N 9188.64 N 0.00 E 1.30W 156.68 W 299.51 W 343.63 W 683.62 W ~~~1ft,~,- ,r¿;~~;) '-'-'><- ,'08W .2.90W 2766.55 W 2637.08 W 2611.27 W 2242.96 W 2201.80 W 1792.67 W 1710.96 W 1076.19 W Sperry-Sun Drilling Services Proposal Report for MPS-29 6.0 Revised: 11 September, 2002 Comment ~~~: ",,-. Begin Dir @ 1 .500°/1 OOft : 3dô.00ff'MD, 3Qo.00ft TVD Dir Rate Incre~~;~i~7500/1 öØf!~: 4~~~33ftMD,433.30ftTVD Decreas~iÐ ~Fiate't,1.7500/100ft/1451.52ft MD, 1402.34ftTVD End ir, StWt SåiL~}68.0000: 1908.66ftMD,1781.02ftTVD Be '100ft:2036.81ftMD,1882.00ftTVD 70.680° : 2859.24ftMD,2355.16ftTVD B .0000/100ft: 8061.97ft MD, 4076.46ftTVD End tart Sail @ 87.650° : 8488.71ftMD,4156.39ftTVD Begin Dir @ 4.0000/100ft: 8707.16ft MD, 4165.35ftTVD Dir Rate Increase @ 12.0000/100ft: 9388.33ftMD,4191.70ftTVD End Dir, Start Sail @ 88.795° : 9805.78ftMD,4204.18ftTVD Begin Dir @ 4.000°/1 0 Oft : 10049.79ft MD, 4209.31ft TVD End Dir, Start Sail @ 85.432° : 10554.43ftMD,4245.70ftTVD Begin Dir @ 4.0000/100ft: 10720.92ft MD, 4256.70ft TVD End Dir, Start Sail @ 87.554° : 10756.05ftMD,4258.37ftTVD Begin Dir @ 4.0000/100ft: 11262.53ft MD, 4279.98ft TVD End Dir, Start Sail @ 87.961° : 11320.20ftMD,4282.19ftTVD Begin Dir @ 4.0000/100ft: 11904.84ft MD, 4302.900 TVD End Dir, Start Sail @ 88.562° : 12027.00ftMD,4306.70ftTVD Total Depth: 13023.26ftM D ,4331. 70ftTVD PageBof9 BPXA Milne Point MPS '-..ø' ......,' DrHlQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MP5-29 6.0 Revised: 11 September, 2002 BP EXPLORATION (ALASKA) INC. Milne Point Unit Targets associated with this wellpath Target Name MPS-29 Pump Target- MPS-29 T1 MPS-29 T2 MPS-29 T3 MPS-29 T4 MPS-29 T5 MPS-29 T6 11 September, 2002 - 13:27 Page90f9 BPXA Milne Point MPS Target Target Shape Type 5361.75 N 3075.14 W Point ~ 6579.12 N 3531.23 W Point 4211.70 7142.55 N 3122.26 W Point 4256.70 7502.30 N 2637.08 W Point 4281.70 7903.57 N 2211.53 W Point 4306.70 8421.19 N 1710.96 W Point 4331.70 9188.64 N 1076.19 W Point ~ Drll/Quest 2.00.09.008 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DATE CHECK NO. 8/01/02 H207045 VENDOR DISCOUNT NET $100.00 H H 207045 08/01/02 CK073102L Permit To Dril~ Fee E ì: ~ ~:"~..,, .' 'ì I rYlf0-'19 i; L I PIs contact Sandra Stewman X4750 for check pickup THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ $100.00 BP EXPLORATION, (ALASKA) INC. P.o. BOX 196612 ANCHORAGE, ALASKA 99519.6612 FIRST NATIONAL BANK OF ASHLAND ANAFFIUATE OF NATIONAL CITY BANK CLEVELAND. OHIO No. H 20<7045 CONSOLIDATED COMMERCIAL ACCOUNT 56-389 4t2 PAY B" P'." . r:,,I_",.,'.',.~I',,'~ ølUt,'.,J,'. ,tlU',,1 ¡,''',',. ....., ""b, ",f,l. ..~ .,1 1/ " ..,. '~I .. ,'. . .~, (II~ 1m' I ,utm ."n~ ..... AMOUNT TO THE ORDER OF Alaska Oil & GasConservatiçm 333 W 7th Ave, stel00 ' Anchorage, AI< 99501 * * * * * $100...00* ***'ir* NOTNAUD AFTER 120 DAYS lð¡l~:.:!;~~¡:.~;~'::;¡~:t~¥J~1 III 2 0 ? 0 ~ Sill I: 0... ~ 2 0 ~ a q 5 I: 0 0 a ~... ~ Ii II' TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT (PH) HOLE SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/1 0/02 C\jody\templates "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as a function' of the original API number stated above. In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (SO 70/80) from records, data and logs acquired for well (name on permit). ' The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY ~ Y WELL NAME /1/¿, H~-;? 7 PROGRAM: Exp - Dev ~ Redrll - Re-Enter - Serv - Wellbore seg - FIELD & POOL .525 / ~ ~ INIT CLASS ~j/ / -Ój"j r ~ GEOL AREA r9 n UNIT# 113' ¿ <¡ ON/OFF SHORE ..o.LJ ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . Y N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N æ, /:'~...~? 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N ff( . ~<-- 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . \.YJ N (Service Well Only) 13. Well located w/in ar,ea & strata authorized by injection order#- ~Y, '/U.r:l. (Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. k... N ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ~N 16. Surface casing protects all known USDWs. . . . . . . . . . . O/'N £L.Îo;:;., L 17. CMT vol ádequate to circulate on conductor & surf csg. . . . . (j) N ~- "--'-:(l~- ~. 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y £Þ I J L ¡ 19. CMT will cover all known productive horizons. . . . . . . . . . '~¥ N ~~ 20. Casing designs adequate for C, T, B & permafrost. . .. . . . , N D 21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . ,N ~ c>V'- /41 22. If a re-drill, has a 10-403 for abandonment been approved. . . '¥-N-I\L/N 23. Adequate wellbore separation proposed.. . . . . . . . . . . . N 24. If diverter required, does it meet regulations. . . . . . . . . . N a t> 25. Drilling fluid program schematic & equip list adequate. . . . . N ~ /Yl kI 7,. J... f ¡/c-'1' . 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N,.. F APPR DATE 27. BOPE press rating appropriate; testto t.fco 0 psig. N J41,c> e 1&/12 ps i.- " Â- I . J 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 1¡./C¡,"'{' ~ 12 ~/() i- 29. Work will occur without operation shutdown. . . . . . . . . . . N 30. Is presence of H2S gas probable... . . . . . . . . . . . . . . Y (6j) 31. Mechanical condition of wells within AOR verified. . . . . . . . -¥--N""" ^'-/A:- @ ){ A),,q. RESERVOIR ENGINEERING UIC ENGINEER (Service Well Only) GEOLOGY APPR DATE g ~þ2- (Exploratory Only) 32. Permit can be issued wlo hydrogen sulfide measures. . . . . 33. Data presented on potential overpressure zones. . . . . . . . 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . 36. Contact name/phone for weekly progress reports. . . . . . . . GEOLOGY: RPH, PETROLEUM ENGINEERING: TEM JDH JBR Rev: 07/12/02 SFD- WGA \tJ6A- MJW G:\geology\permits\checklist.doc COMMISSIONER: COT ccr DTS Commentsllnstructions: ) ') Well H ¡story File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simpltfy finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. ) ') a 0;)-/ c¡s t l3 7{~ Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Dec 09 08:52:49 2002 Reel Header Service name.... ..... ... .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ..... ....... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments..... ...... ..... .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............. ...UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments........ ..... ....STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD /MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-29 500292311900 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 09-DEC-02 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 B. ZIEMKE C. DIXON MWD RUN 4 R. FRENCH E. VAUGHN MWDRUN 2 MWDRUN 3 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: B. HENNINGSE C. DIXON B. HENNINGSE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3270 340 MSL 0) 66.60 39.10 ) ) # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 108.0 6.125 7.625 9237.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 - 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). RUN 4 ALSO INCLUDED AT-BIT-INCLINATION (ABI) . 4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 10/16/02. MWD DATA ARE CONSIDERED PDC. 5. MWD RUNS 1 - 4 REPRESENT WELL MPS-29 WITH API#: 50-029-23119-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12950'MD/4313'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.. ....... ..1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type.... ... ........ .LO Previous File Name..... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # 1 clipped curves; all bit runs merged. .5000 ) FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR ROP $ START DEPTH 64.0 64.0 64.0 64.0 64.0 71.5 109.0 STOP DEPTH 12903.0 12903.0 12903.0 12903.0 12903.0 12896.0 12950.0 ) # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 64.0 3213.5 MWD 2 3213.5 7508.5 MWD 3 7508.5 9248.0 MWD 4 9248.0 12950.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point... ...... .... .Undefined Frame Spacing..................... 60 .1IN Max frames per record.... ........ . Undefined Absent value............. .... ... ..-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Service Unit DEPT FT ROP MWD FT/H GR MWD API RPX MWD OHMM RPS MWD OHMM RPM MWD OHMM RPD MWD OHMM FET MWD HOUR Min 64 2.69 4.48 0.1 0.07 0.07 0.07 0.02 Max 12950 1890 127.26 2000 2000 2000 2000 80.99 Mean 6507 329.42 67.9671 116.123 90.1393 88.0199 148.86 0.75326 Nsam 25773 25683 25650 25679 25679 25679 25679 25679 First Reading For Entire File......... .64 First Reading 64 109 71.5 64 64 64 64 64 Last Reading 12950 12950 12896 12903 12903 12903 12903 12903 Last Reading For Entire File........ ...12950 File Trailer Service name. ..... ...... .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..02/12/09 Maximum Physical Record. .65535 File Type... ... ......... .LO Next File Name....... ....STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation... ... .02/12/09 Maximum Physical Record. .65535 File Type. . . . .. ..... . ... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPX RPS RPM RPD FET GR ROP $ 2 ) header data for each bit run in separate files. 1 .5000 START DEPTH 64.0 64.0 64.0 64.0 64.0 71.5 109.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 3169.5 3169.5 3169.5 3169.5 3169.5 3177.0 3213.5 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA 01-0CT-02 Insite 66.37 Memory 3213.0 108.0 3213.0 2.1 73.1 TOOL NUMBER 66093 103792 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ...... ....0 Data Specification Block Type.....O Logging Direction.. ....... ...... ..Down Optical log depth units.... ..... ..Feet Data Reference Point........ .... ..Undefined Frame Spacing.................... .60 .1IN Max frames per record. ........... . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ') 9.875 108.0 LSND 9.10 102.0 7.5 600 11.4 7.800 72.0 8.220 68.0 8.000 72.0 5.700 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR Max 3213.5 1798.06 118.58 2000 2000 2000 2000 2.36 Min 64 17.43 16.08 0.1 0.07 0.07 0.07 0.02 MWD010 MWD010 MWD010 MWD010 MWD010 MWD010 MWD010 First Reading For Entire File..... ... ..64 Last Reading For Entire File......... ..3213.5 Mean 1638.75 300.231 61.2295 427.578 318.097 291.288 542.34 0.332265 First Reading 64 109 71.5 64 64 64 64 64 Nsam 6300 6210 6212 6212 6212 6212 6212 6212 Last Reading 3213.5 3213.5 3177 3169.5 3169.5 3169.5 3169.5 3169.5 ) File Trailer Service name.......... ...STSLIB.002 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation. ..... .02/12/09 Maximum Physical Record..65535 File Type................ LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name.......... ...STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type............. ...LO Previous File Name.... ...STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPS FET RPD RPX RPM GR ROP $ 3 ") header data for each bit run in separate files. 2 .5000 START DEPTH 3170.0 3170.0 3170.0 3170.0 3170.0 3177.5 3214.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 7464.0 7464.0 7464.0 7464.0 7464.0 7472.0 7508.5 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 03-0CT-02 Insite 66.37 Memory 7508.0 3213.0 7508.0 67.2 74.2 TOOL NUMBER 66093 103792 9.875 ') # DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type. ......... ........0 Data Specification Block Type.....O Logging Direction.... ........ .....Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing................ .... .60 .1IN Max frames per record............ . Undefined Absent value..... ................ .-999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 ) 108.0 LSND 9.20 134.0 7.0 500 9.4 8.000 75.0 7.910 75.9 8.000 75.0 6.000 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR MWD020 MWD020 MWD020 MWD020 MWD020 MWD020 MWD020 Min 3170 11.03 4.48 4.52 3.79 1.14 1.69 0.05 Max 7508.5 1890 114.74 273.27 412.97 1390.59 1445.87 8.06 First Reading For Entire File... ...... .3170 Last Reading For Entire File.......... .7508.5 Mean 5339.25 488.312 65.5595 15.9172 16.2883 16.6864 17.9489 0.41744 Nsam 8678 8590 8590 8589 8589 8589 8589 8589 First Reading 3170 3214 3177.5 3170 3170 3170 3170 3170 Last Reading 7508.5 7508.5 7472 7464 7464 7464 7464 7464 ) File Trailer Service name. ...... ..... .STSLIB.003 Service Sub Level Name. . . Version Number..... ..... .1.0.0 Date of Generation.. .... .02/12/09 Maximum Physical Record..65535 File Type................LO Next File Name. ......... .STSLIB.004 physical EOF File Header Service name...... ...... .STSLIB.004 Service Sub Level Name. . . Version Number.... ...... .1.0.0 Date of Generation... ....02/12/09 Maximum Physical Record..65535 File Type.... ........... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPX RPS RPD RPM GR ROP $ 4 ") header data for each bit run in separate files. 3 .5000 START DEPTH 7464.5 7464.5 7464.5 7464.5 7464.5 7472.5 7509.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 9203.5 9203.5 9203.5 9203.5 9203.5 9211.0 9248.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 04-0CT-02 Insite 66.37 Memory 9248.0 7508.0 9248.0 67.6 88.7 TOOL NUMBER 66093 103792 9.875 108.0 J # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..... .... .........0 Data Specification Block Type.....O Logging Direction.. .............. . Down Optical log depth units. ......... .Feet Data Reference Point. ............ . Undefined Frame Spacing.. .................. .60 .1IN Max frames per record. .......... ..Undefined Absen t value... . . . . . . . . . . . . . . . . . . . - 9 9 9 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O LSND 9.20 111.0 7.0 500 8.6 3.500 2.580 7.000 3.300 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR Min 7464.5 11.23 29.51 4.84 4.94 5.05 5.22 0.07 Max 9248 819.68 110.78 567.44 114.05 84.45 80.88 17.4 MWD030 MWD030 MWD030 MWD030 MWD030 MWD030 MWD030 First Reading For Entire File....... ...7464.5 Last Reading For Entire File.......... .9248 Mean 8356.25 210.759 74.5025 17.5679 17.6889 18.6274 19.5477 0.86413 Nsam 3568 3479 3478 3479 3479 3479 3479 3479 ) 75.0 104.0 75.0 75.0 First Reading 7464.5 7509 7472.5 7464.5 7464.5 7464.5 7464.5 7464.5 Last Reading 9248 9248 9211 9203.5 9203.5 9203.5 9203.5 9203.5 ) File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type................LO Next File Name.. ...... ...STSLIB.005 physical EOF File Header Service name.... ........ .STSLIB.005 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation..... ..02/12/09 Maximum Physical Record. .65535 File Type.. ............. .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPX RPS GR ROP $ 5 header data for each bit run in separate files. 4 .5000 START DEPTH 9204.0 9204.0 9204.0 9204.0 9204.0 9211.5 9248.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 12903.0 12903.0 12903.0 12903.0 12903.0 12896.0 12950.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # 09-0CT-02 Insite 66.37 Memory 12950.0 9248.0 12950.0 84.7 91.5 TOOL NUMBER 91360 162742 6.125 9237.0 ) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction.. ............ ...Down Optical log depth units.......... .Feet Data Reference Point...... ....... . Undefined Frame Spac ing. . . . . . . . . . . . . . . . . . . . . 60 . 1 IN Max frames per record... ....... ...Undefined Absent value................... ...-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 ) Flo-Pro 9.15 70.0 8.0 22000 3.6 .200 .170 .300 .600 75.0 92.0 75.0 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPM MWD040 OHMM 4 1 68 16 5 RPD MWD040 OHMM 4 1 68 20 6 FET MWD040 HOUR 4 1 68 24 7 RPS MWD040 OHMM 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9204 12950 11077 7493 9204 12950 ROP MWD040 FT/H 2.69 797.76 225.316 7404 9248.5 12950 GR MWD040 API 32.84 127.26 73.368 7370 9211.5 12896 RPX MWD040 OHMM 0.73 1551.7 17.2964 7399 9204 12903 RPM MWD040 OHMM 0.37 2000 32.7962 7399 9204 12903 RPD MWD040 OHMM 0.75 2000 31.2746 7399 9204 12903 FET MWD040 HOUR 0.14 80.99 1.44442 7399 9204 12903 RPS MWD040 OHMM 1.01 1730.45 18.5464 7399 9204 12903 First Reading For Entire File......... .9204 Last Reading For Entire File. .... ..... .12950 File Trailer ') ) Service name.. ........ ...STSLIB.005 Service Sub Level Name... Version Number... ...... ..1.0.0 Date of Generation..... ..02/12/09 Maximum Physical Record. .65535 File Type............... .LO Next File Name........ ...STSLIB.006 Physical EOF Tape Trailer Service name. .... ....... .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 02/12/09 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.. ............ ..UNKNOWN Continuation Number..... .01 Next Tape Name... ....... . UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 12 / 09 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ............ . UNKNOWN Continuation Number..... .01 Next Reel Name..... ... ...UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File