Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-196 . . ..;,<.;Y MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc l' f AU" . A... fi ¡;,.~ . 10 1\ ê '1/ ,(V ~ tJ t DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Well Name/No. MILNE PT UNIT SB S-29L 1 Operator BP EXPLORATION (ALASKA) INC Permit to Drill 2021960 API No. 50-029-23119-60-00 ND 4274:/ Completion Date 1 0/16/2002 ,...-~ Completion Status 1-01L Current Status 1-01L UIC N MD 12950 REQUIRED INFORMATION Directional Survey ~)~. Samples No Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, GYRO, ABI/IFRlCASANDRA Well Log Information: (data taken from Logs Portion of Master Well Data Maint) Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No Rpt CDirectional Survey 1 Rpt ~387 "Æfirectlonal Survey 1 ED D LIS Verification 1 ED D £..Qirectional Survey 1 ED D Lßectional Survey 1 . /' ~ Interval Start Stop 8792 12950 8792 12950 71 12896 8792 12950 8792 12950 OH/ CH Received Comments Open 11/1/2002 MWD Open 11/1/2002 Case 12/13/2002 Open 11/1/2002 MWD Open 11/1/2002 A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 9/30/2002. &-(IS Verification ~t 71 12896 Case 12/13/2002 1,2,3,5, 64 12950 Open 6/2/2003 25 3,5,6 108 12950 Open 6/2/2003 MWD - ROP, DGR, EWR - MD 25 3,5,6 108 4274 Open 6/2/2003 MWD - DGR, EWR - ND Sample Set Sent Received Number Comments ED C Asc ~ 1963 LIS Verification ED C Pdf a.f11963 Induction/Resistivity ED C Pdf ¿11963 Induction/Resistivity ~ Well Cores/Samples Information: Interval Start Stop Name Permit to Drill 2021960 MD 12950 ND 4274 ADDITIONAL INFORMATION Well Cored? y~ Chips Received? '--r7~ Analysis -V'-,N--- Received? Comments: Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Well Name/No. MILNE PT UNIT SB S-29L1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23119-60-00 Completion Date 10/16/2002 Completion Status 1-01L Daily History Received? Formation Tops ~ Current Status 1-01L (f)N cDN Date: UIC N .~ ¡'~~ \~~~ I ~< ) ) 0CìVJ-/9& a )CX # /'/9W3 WELL LOG TRANSMITIAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 January 16, 2003 RE: MWDFormation Evaluation Logs: MPS-29 Ll, AK-MW-22160 MPS-29 Ll: Digital Log Images: 50-029-23119-60 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNJNG THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E, Benson Blvd, Anchorage, Alaska 99508 RECEIVED Date~UN 0 2 2003 Alaska OH & Gas Cons. CommiJeion Anchorøge d--D ;;;( - I 'iL.o Signed~~. JV"\~~~ '-~ ~"\~ í'v\ ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 01/05/03, Start Production ) ') 23. CASING SIZE 20" 7-5/8" 1. Status of Well aD Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 3462' NSL, 3493' WEL, SEC. 01, T12N, R10E, UM {OA} At total depth 1792' NSL, 14281 WEL, SEC. 35, T13N, R10E, UM {OA} 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE= 66.6' ADL 025518 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 10-10-2002 10-13-2002 10-16-2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 12950 4274 FT 12950 4274 FT aD Yes aD No 22. Type Electric or Other Logs Run MWD , GR , RES, GYRO, ABI/IFR 1 CASANDRA CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE 28' 112' 42" 28' 8842' 9-7/8" Classification of Service Well ~- .', ~~~l ..; .,:.) !:!_~1 7. Permit Number 202-196 8. API Number 50-029-23119-60 9. Unit or Lease Name Milne Point Unit 10. Well Number M PS-29L 1 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions N/A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' {Approx.} WT. PER FT. 92# 29.7# GRADE H-40 L-80 4-1/2" 12.7# L-80 8820' CEMENTING RECORD 260 sx Arctic Set (Approx.) 1868 sx PF IL', 600 sx Class 'G' (Top Job 49 sx PF 'L' ) 6-1/8" Uncemented Slotted Liner AMOUNT PULLED 12911' . 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. SIZE 4-1/2", 12.6#, L-80 TUBING RECORD DEPTH SET (MD) 8174' PACKER SET (MD) 8123' MD TVD MD TVD 9344' - 12867' 4150' - 4273' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 82 Bbls of Diesel 27. Date First Production December 11, 2002 Date of Test Hours Tested 12/18/2002 6 Flow Tubing Casing Pressure Press. PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL -BBL TEST PERIOD 1321 OIL-BBL CALCULATED 24-HoUR RATE GAs-McF 931 GAs-McF WATER-BBL 0 WATER-BBL CHOKE SIZE GAS-OIL RATIO 705 OIL GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wat~ 1:bCitlVtD No core samples were taken. 28. ,JJ\N 0 6 2003 i~aska au & Gas Cons. Commission Form 10-407 Rev. 07-01-80 RBDMS BFl 6F- 0 '100 ,,/ tt .3 Submit In Duplicate , , ) ') 29. Marker Name Geologic Markers Measured Depth 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. BF1-NB 7863' 4013' SBF1-NBR 7877' 4018' SBF12 7921' 4034' SBE4-NC 7944' 4043' SBE41 7961' 4049' SBE2-NE 7978' 4055' SBE1-NF 8115' 41051 Top of Schradder OA Sand 82021 4131' Top of Schradder OA Sand 12873' 4273' RECEIVE JAN 06 2003 Commission 31. List of Attachments: Post Rig Work Summary Report. 32. I hereby certify that the foregoing is Signed Title Technical Assistant Date 0 l - OS --03 MPS-29L 1 Well Number 202-196 Permit No. I Approval No. Prepared By Name/Number: Sondra Stewman, 564-4750 Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ) ) MPS-29 & MPS-29L 1 Milne Point Unit I Schrader Bluff Field 50-029-23119-00 & 50-029-23119-60 202-195 & 202-196 Rig Accept: 09/29/02 Rig Spud: 09/30102 Rig Release: 10/16/02 141 POST RIG WORK 11/13/02 RIH VERY SLOW, PULLED BALL & ROD @ 8145'WLM. PLAN TO ASSEMBLE EXTRA LUBRICATOR SECTION & EXTRA WEIGHT BAR TO RETRIEVE RHC IN AM. 11/14/02 USED PUMP TRUCK TO ASSIST IN WIRELlNE OPERATIONS, AS SHOWN ABOVE. PULLED RHC @ 8169'. PULLED RP SHEAR VALVE @ 2214', AND REPLACED WI DGLV. SHIFTED SSD INTO OPEN POSITION, AND SET JET PUMP WI 138 RATIO, #13 NOZZLE, AND #14 THROAT (SER#BP- 1071). FREEZE PROTECTED IA WI 52 BBLS DIESEL. ') ) ao~- f9k, / / 3~1 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 December 12, 2002 RE: MWD Formation Evaluation Logs MPS-29 Ll, AK-MW-22160 1 LIS formatted Disc with verification listing. API#: 50-029-23119-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Si~~ RECEIV'E,D DEC 13 2Q02 Alaska Wi) & Gas Coos. CQmmj~n Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ) ) 1. Status of Well 181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM".: ': At top of productive interval ~ J()'::Yt. o¿ 3462' NSL, 3493' WEL, SEC. 01, T12N, R10E, UM (OA) 1 ~;;::-':',:~':"" : At total depth j V[~::.1 '. ., 1792' NSL, 1428' WEL, SEC. 35, T13N, R10E, UM (OA) t::Z=:.:.:.::J 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE= 66.6' ADL 025518 12. Date Spudde? 13. Date T.D. Rea~hed 14. Date Comp., Susp., or Aband. 10-10-2002 1 0-13-~002 10-16-2002 . 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 12950 4274 FT 12950 4274 FT 181 Yes 0 No 22. Type Electric or Other Logs Run MWD , GR , RES, GYRO, ABIIIFR I CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD 20" 92# H-40 28' 112' 42" ~60 sx Arctic Set (Approx.) 7-5/8" 29.7# L-80 28' 8842' 9-7/8" 1868 sx PF 'L', 600 sx Class 'G' (Top Job 49 sx PF 'L' ) 12911' 6-1/8" Uncemented Slotted Liner Classification of Service Well 7. Permit Number 202-196 8. API Number 50-029-23119-60 9. Unit or Lease Name Milne Point Unit 10. Well Number MPS-29L 1 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' {Approx.} "'-/IcJI~ gg'l'Z" /n,b ii7~I'7YD AMOUNT PUllED 4-112" 12.7# L-80 8820' 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner SIZE 4-1/2", 12.6#, L-80 TUBING RECORD DEPTH SET {MD} 8174' PACKER SET (MD) 8123' 25. MD TVD MD TVD 9344' - 12867' 4150' - 4273' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 82 Bbls of Diesel 27. Date First Production Not on Production Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) N/A PRODUCTION FOR Oll-BBl TEST PERIOD GAs-McF WATER-Bsl CHOKE SIZE GAS-Oil RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28, Brief description of lithology, porosity, fractures, apparentc;: ~';~resence of oil, gas or water. sUbmE:i (;ili.' V E D Oil -BBl GAs-McF WATER-BSl Oil GRAVITY-API (CORR) No core samples were taken. RBDMS BFL .~,1~:11 r" NOV 1 4 2002 Alaska Oil & Gas Gons. Commission Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate ') 29. Geologic Markers Marker Name Measured True Vertical Depth Depth BF1-NB 7863' 4013' SBF1-NBR 7877' 4018' SBF12 7921' 4034' SBE4-NC 7944' 4043' SBE41 7961' 4049' SBE2-NE 7978' 4055' SBE1-NF 8115' 4105' Top of Schradder OA Sand 8202' 4131' Top of Schradder OA Sand 12873' 4273' 31. List of Attachments: ') 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. RE(EIVED NOV 1 4 2002 AlasJ(a Oil & Gas Cons. CommiuioJ) Anchorage Summary of Daily Drilling Reports, Surveys and Leak-Off Test Summary 32. I hereby certify that the ~~?ing is true ~rrect to the best of my knowledge Signed sondra~wman ~~ Title Technical Assistant Date '\ \-l~-ò'-- MPS-29L 1 202-196 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit No. I Approval No. Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. Form 10-407 Rev. 07-01-80 Legal Name: MPS-29 Common Name: MPS-29 Test Date 10/8/2002 Test Tjpé FIT Test Depth (TMD) 9,278.0 (ft) BP EXPLORATION Leak-Off Test Summary Test Depth (TVD) 4,192.0 (ft) AMW 8.90 (ppg) Surface Pressure 540 (psi) Leak Off Pressure (BHP) 2,478 (psi) Page 1 of 1 EMW 11.38 (ppg) ~ '~ Printed: 10/21/2002 8:49:21 AM ) BP EXPLORATION OperationSSurtll1'laryRepQr1 Page1of7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 9/29/2002 14:00 -19:30 5.50 MOB P PRE MOVE RIG FROM MPS-17, SPOT RIG OVER MPS-29 19:30 - 20:30 1.00 MOB P PRE SPOT ROCKWASHER, HOOK UP SERVICE LINES 20:30 - 00:00 3.50 MOB P PRE REPAIRING TOP DRIVE 9/30/2002 00:00 - 04:00 4.00 RIGU P PRE NIPPLE UP DIVERTER, TAKING ON WATER, MIXING SPUD MUD, LOAD PIPE SHED RIG ACCEPT @ 00:01 9/30/2002 04:00 - 05:00 1.00 RIGU P PRE CHANGE OUT TOP DRIVE SAVER SUB. 05:00 - 14:00 9.00 DRILL P INT1 PICKING UP DRILL PIPE AND STANDING IN DERRICK, TOTAL OF 297 JTS. OF 4 IN, 17 JTS 5 HWP, 3 FLRX COLLARS 14:00 -15:00 1.00 DRILL P INT1 SLIP AND CUT DRILLING LINE 15:00 - 15:30 0.50 DRILL P INT1 SPUD MEETING 15:30 - 17:00 1.50 DRILL P INT1 PICKUP BHA BIT ,7" MOTOR 1.5 BEND, STAB,MWD,HANG OFF SUB,UBHO SUB,STAB, I STAND HWP 17:00 - 17:30 0.50 DRILL P INT1 FUNCTION TEST DIVERTER AND ACCUMULATOR WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK SCHEVE AOGCC 17:30 - 19:30 2.00 DRILL P INT1 SPUD WELL, DRILLING FROM 108 TO 270' GOT GOOD MWD SURVEY @ 168 FT SURVEY DEPTH 19:30 - 20:30 1.00 DRILL P INT1 RIG UP SLICK LINE RUN GYRO @ 178' SURVEY DEPTH 20:30 - 00:00 3.50 DRILL P INT1 DRILLING FROM 270' TO 813' WITH 70 RPM, 20/25K BIT WT. 360 GALS MIN. 900 PSI, TQ 3,000 ART 2, AST 1.5 KICKED OFF @ 270 FT. 10/1/2002 00:00 -16:30 16.50 DRILL P INT1 DRILLING FROM 813' TO 3213' - WOB 15K TO 20K - GPM 505 - PP ON 2520 - PP OFF 2400 - RPM 80 - TQ ON 5K - TO OFF 3K - PU 78K - SO 62K - ROT 73K 16:30 -17:30 1.00 DRILL P INT1 CIRC CONDITION HOLE FOR TRIP - 80 RPM'S - 500 GPM - PP 2400 17:30 - 20:00 2.50 DRILL P INT1 PUMP OUT OF HOLE @ 500 GPM TO 719' 20:00 - 22:00 2.00 DRILL P INT1 BHA - STAND BACK HWDP - FLEX DC'S - UD UBHO SUB - BREAK OFF BIT - ADJUST MOTOR TO 1.22 DEGREE - M/U BIT # 2 - ORIENT - RIH WITH FLEC DC'S 22:00 - 22:30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 22:30 - 23:00 0.50 DRILL P INT1 BHA - RIH WITH HWDP - JARS - PULSE TEST MWD 23:00 - 00:00 1.00 DRILL P INT1 CON'T RIH WITH DP TO 3213' 10/212002 00:00 - 01 :30 1.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3213' TO 3518'- WOB 20K- GPM 500 - PP ON 2550 - PP OFF 2450 - RPM 120 - TQ ON 5K TQ OFF 4K 01 :30 - 02:00 0.50 DRILL N SFAL INT1 MUD PUMP # 1 - CHECK SUCTION VALVES - TIGHTEN LINES 02:00 - 06:30 4.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3518' TO 4546' - WOB 25K TO 30K - GPM 500 - PP ON 3050 - PP OFF 2900 - RPM 120 - TO ON 7K - TO OFF 5K - PU 93K - SO 62K - ROT 77K 06:30 - 08:00 1.50 DRILL P INT1 CIRC FOR SHORT TRIP - 3 X BU - OBSERVE WELL 08:00 - 11 :00 3.00 DRILL P INT1 PULL OUT HOLE TO 3610' - SWABBING TIGHT - PUMP OUT FROM 3610' TO 720' - GPM 500 11 :00 - 11 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 11 :30 - 13:00 1.50 DRILL P INT1 RIH TO 4455' - WASH / REAM FROM 4455' TO 4546' 13:00 - 20:30 7.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4546' TO 5834' - WOB 25K TO 30K - GPM 500 - PP ON 3450 - PP OFF 3300 - RPM 120 - TO ON 10K - TO OFF 7K - PU 112K - SO 50K - ROT 82K 20:30 - 21 :30 1.00 DRILL N RREP INT1 SWIVEL PACKING - PULL STAND OUT OF HOLE - TIGHT - INSTALL CIRC HEAD PIN - CIRC HOLE WITH 30 STKS 107 Printed: 1012112002 8:51:00AM ') Operations Summary Report Legal Well Name: MPS-29 Common Well Name: MPS-29 Spud Date: 9/30/2002 Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 1 0/16/2002 Contractor Name: DOYON Rig Release: 10/16/2002 Rig Name: DOYON 141 Rig Number: 141 Date From - To Hours Task Code NPT Phase Description of Operations 10/212002 20:30 - 21:30 1.00 DRILL N RREP INT1 GPM @ 500 PSI - CHANGE OUT SWIVEL PACKING - WASH BACK TO BTM 21 :30 - 00:00 2.50 DRILL P INT1 DIRECTIONAL DRILL FROM 5834' TO 6134' - WOB 25K TO 30K - GPM 500 - PP ON 3500 - PP OFF 3400 - RPM 120 - TO ON 10K - TQ OFF 7K - PU 115K - SO 50K - ROT 78K 10/3/2002 00:00 - 08:30 8.50 DRILL P INT1 DIRECTIONAL DRILL FROM 6134' TO 7508' - WOB 25K TO 30K - RPM 120 - TQ ON 12K - TQ OFF 8K - GPM 500 - PP ON 3770 - PP OFF 3600 - PU 135K SO 50K - ROT 85K 08:30 - 11 :00 2.50 DRILL P INT1 CIRCULATE HOLE CLEAN 3 X BU - GPM 500 - RPM 120- OBSERVE WELL - WELL STATIC 11 :00 - 17:30 6.50 DRILL P INT1 PUMP OUT OF HOLE TO 2200' - GPM 500 - CON'T PULL OUT HOLE TO BHA 17:30 - 21 :00 3.50 DRILL P INT1 STAND BACK 4 STANDS OF 5" HWDP - JARS - UD 6 JTS OF 5" HWDP - STAND BACK FLEX DC'S - BREAK BIT - M/U NEW BIT - (PRECAUCTIONARY BIT CHANGE FOR T.D. WELL) - DOWN LOAD MWD - UP LOAD MWD - RIH WITH FLEX DC'S - 5" HWDP - JARS - PULSE TEST MWD 21 :00 - 21 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE - BLOCKS 21 :30 - 00:00 2.50 DRILL P INT1 RIH WITH 5" DP TO 5830' - FILL PIPE 25 STDS AND 23 STANDS - (5000' TO 5830') STRING TAKING WEIGHT WORKING IN HOLE - FRICTION WT 1014/2002 00:00 - 01 :30 1.50 DRILL P INT1 PUMPING / REAMING IN HOLE FROM 5830' TO 6813' - RIH FROM 6813' TO 6954' - PUMP IN HOLE FROM 6954' TO 7175' - RIH FROM 7175' TO 7361'- PUMP / REAM FROM 7361' TO 7508' 01 :30 - 18:30 17.00 DRILL P INT1 DIRECTIONAL DRILL FROM 7508' TO 9248' - T.D. 97/8" HOLE - WOB 15K TO 20K - RPM 120 - TQ ON 12K - TO OFF 10K - GPM 480 - PP ON 4130 - PP OFF 4000 - PU 137K - SO 48K - ROT 86 18:30 - 00:00 5.50 DRILL P INT1 CIRCULATE HOLE CLEAN - 4 X BU - 35000 STKS - RPM 120 - GPM 480 - STAND ONE STAND BACK EVERY 4000 STROKES PUMPED - OBSERVE WELL - WELL STATIC 101512002 00:00 - 01 :00 1.00 DRILL P INT1 PUMP OUT FROM 8425' TO 7500' - GPM 480 - NO PROBLEMS HOLE IN GOOD SHAPE 01 :00 - 05:00 4.00 DRILL P INT1 POOH FROM 8425' TO BHA @ 541' 05:00 - 06:30 1.50 DRILL P INT1 PULL BHA - DOWN LOAD MWD - UD MWD - BREAK BIT - UD MOTOR 06:30 - 07:30 1.00 DRILL P INT1 CUT DRLG LINE 07:30 - 08:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 08:00 - 09:00 1.00 DRILL P INT1 MAKE UP HOLE OPENER - RIH TO 1500' 09:00 - 13:00 4.00 DRILL P INT1 CONTROL REAM FROM 1500' TO 3466' @ 6 STANDS PER HOUR (INCLUDING CONNECTION TIME) - WOB 0 - RPM 150 - TQ 8K - 550 GPM - PP 1250 13:00 -14:30 1.50 DRILL P INT1 RIH TO 7951' 14:30 - 17:30 3.00 DRILL P INT1 CONTROL REAM FROM 7951' TO 9248' @ 6 STANDS PER HOUR (INCLUDING CONNECTION TIME) - WOB 0 TO 5K - RPM 150 - TQ 10K - PP 3000 - PU 135K - SO 51K - ROT 88K 17:30 - 21 :30 4.00 CASE P INT1 CIRCULATE CONDITION HOLE AND MUD - GPM 550 - PP 3200 - RPM 150 - TO 10K - SPOT LUB PILL @ BIT - OBSERVE WELL - WELL STATIC - PUMP DRY JOB 21 :30 - 00:00 2.50 CASE P INT1 POOH FROM 9248' TO 3000' - HOLE IN GOOD CONDITION 10/6/2002 00:00 - 01 :00 1.00 CASE P INT1 POH FROM 3000' TO BHA @ 477' 01 :00 - 02:30 1.50 CASE P INT1 BHA - LAY DOWN 5" HWDP - JARS - FLEX DC'S - Printed: 10/21/2002 8:51:00AM , ) ) BP EXPLORATION Operations Summary Report Page 3 of? Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/6/2002 01 :00 - 02:30 1.50 CASE P INT1 STABILIZERS - HOLE OPENER 02:30 - 03:30 1.00 CASE P INT1 CHANGE SAVOR SUB TO 41/2 IF 03:30 - 05:00 1.50 CASE P INT1 RIG UP CASING TOOLS TO RUN 7 5/8" CASING - PJSM 05:00 - 13:30 8.50 CASE P INT1 PICK UP AND RUN 225 JTS OF HYDRIL 521 75/8" 29 # CASING + XO JOINTS - (TOTAL 9209' RAN) -LANDED WITH 50K ON WEIGHT INDICATOR - BLOCK WEIGHT 35K - 15K CASING WEIGHT LEFT - SHOE 9237' - FLOAT COLLAR 9150' - NO CIRCULATION REQUIRED - NO BRIDGES- HOLE IN EXCELLENT SHAPE 13:30 - 18:00 4.50 CASE P INT1 CIRCULATE AND CONDITION MUD / HOLE FOR CEMENT JOB - 8 BPM - 500 PSI 18:00 - 23:00 5.00 CASE P INT1 PUMP 10 BBLS WATER - TEST LINES TO 3500 PSI - PUMP 40 BBLS WATER @ 7 BPM - 500 PSI- PUMP 47 BBLS SPACER 10.2 PPG - DROP BOTTOM PLUG - PUMP 3 BBLS SPACER - @ 6.5 BPM - 450 PSI- PUMP TOTAL 1351 BBLS LEAD CEMENT @ 5.5 BPM - 1150 BBLS BACK STARTED GETTING RED DYE - 1300 BBLS LOST RETURNS - PUMPED ADDITIONAL 51 BBLS LEAD CEMENT NO RETURNS - SWITCHED TO TAIL CEMENT - PUMPED 123 BBLS OF 15.8 TAIL @ 4 BPM - DROP TOP PLUG- DISPLACE WITH 30 BBLS WATER HOWCO - TURN OVER TO RIG - NO RETURNS 23:00 - 00:00 1.00 CASE P INT1 DISPLACE CEMENT @ 5.5 BPM WITH RIG PUMP 10fi/2002 00:00 - 00:30 0.50 CASE P INT1 CON'T DISPLACE CEMENT @ 5.5 BPM - BUMPED PLUG WITH 4668 STKS - 392 BBLS - WITH 2400 PSI - HELD FOR 3 MINS - BLEED OFF PRESSURE - FLOATS HELD - PUMP EFF 94% - NO CEMENT TO SURFACE 00:30 - 01 :30 1.00 CASE P INT1 DRAIN / FLUSH DIVERTOR RISER - LAY DOWN LANDING JOINT - RIG DOWN CASING TOOLS 01 :30 - 03:00 1.50 CASE P INT1 NIPPLE DOWN DIVERTOR 03:00 - 04:00 1.00 CASE P INT1 CHANGE OUT TOP DRIVE SAVOR SUB TO 4" 04:00 - 05:30 1.50 CASE P INT1 RIG UP FOR TOP JOB - RUN 1" IN TO 115' - SOLID - WORK 1 " DOWN 3' - PULL 1" PLUGGED WITH GREEN CEMENT - CLEAN 1" - RUN IN HOLE 110'- BREAK CIRC - PUMP 34 BBLS OF LEAD AT 10.7 PPG - 3 BBLS CEMENT BACK - WASH UP / CLEAN CELLAR 05:30 - 06:30 1.00 CASE P INT1 ORIENT - NIPPLE UP WELL HEAD - (FMC GEN 6 5K) - TEST FOR 10 MINS@ 1000 PSI 06:30 - 08:00 1.50 CASE P INT1 NU BOP'S 08:00 - 11 :30 3.50 CASE P INT1 PU 120 JOINTS 4" DRILL PIPE - CIRC DRILL PIPE CLEAN 11 :30 - 12:00 0.50 CASE P INT1 POOH WITH 4" DRILL PIPE 12:00 - 17:00 5.00 BOPSUR P INT1 RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250 LOW 5 MINS - 2500 HIGH 5 MINS - PIPE RAMS - BLIND RAMS - CHOKE MANIFOLD - HYD KILL - HYD CHOKE - MANUAL KILL - MANUAL CHOKE - UPPER / LOWER IBOP - FLOOR SAFETY VALVES - 250 LOW 5 MINS - 4000 HIGH 5 MINS ALL TEST WERE GOOD - ACCUMULATOR TEST - 3000 /1900 - 38 SEC FOR 200 PSI - 3 MINS 45 SECS TO 3000 PSI- 5 BOTTLES 2100 PSI AVG 17:00 - 17:30 0.50 BOPSUR P INT1 RIG DOWN TESTING EQUIPMENT - INSTALL WEAR RING 17:30 - 19:00 1.50 CASE P INT1 PU BHA - SCRIBE - UP LOAD MWD - PULSE TEST MWD - 19:00 - 22:30 3.50 CASE P INT1 RIH TO 9141' 22:30 - 23:30 1.00 CASE P INT1 BREAK CIRC - TEST CASING TO 4000 PSI FOR 30 MINS Printed: 1012112002 8:51:00 AM ) ') B.F>..æ*~lliø~TION Operations SUR1l11aryReþóft Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 1017/2002 22:30 - 23:30 1.00 CASE P INT1 RECORDED ON CHART 23:30 - 00:00 0.50 CASE P INT1 TAG UP ON PLUG 9149' - DRILL PLUG FLOAT COLLAR 9150' - FIRM CEMENT TO 9235' 10/8/2002 00:00 - 00:30 0.50 CASE P INT1 DRILL SHOE @ 9236' - 30' NEW HOLE @ 9278' 00:30 - 01 :30 1.00 CASE P INT1 CIRC BTMS UP - BALANCE MUD WT TO 8.9 PPG - FOR FIT 01 :30 - 02:00 0.50 CASE P INT1 FIT - 540 PSI - 8.9 PPG - 4192lVD = 11.38 PPG EMW 02:00 - 03:00 1.00 CASE P INT1 DISPLACE OLD 8.9 PPG SPUD MUD WITH NEW 9.1 PPG FLOPRO 03:00 - 00:00 21.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 9278' TO 11350' - WOB 3K TO 13K - RPM 100 - TQ ON 7K - TQ OFF 6K - GPM 250 - PP ON 2350 - PP OFF 2000 - PU 100K - SO 50K - ROT 82K 10/9/2002 00:00 - 15:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 11350' TO 12950'- T.D. OB LATERAL - WOB 3K TO 13K - RPM 100 - TQ ON 7K - TQ OFF 6K - GPM 250 - PP ON 2450 - PP OFF 2200 - PU 120 - SO 52 - ROT 84 15:00 - 18:00 3.00 CASE P COMP CIRCULATE CLEAN UP HOLE - CBU 3 X - RPM- 100 - GPM 250 - PP 2150 - PUMP LUB PILL 18:00 - 21 :30 3.50 CASE P COMP PUMP OUT FROM 12855' TO 9350' - GPM 250 - HOLE IN GOOD SHAPE 21 :30 - 00:00 2.50 CASE P COMP POOH @ 1200' 10/1012002 00:00 - 01 :00 1.00 CASE P COMP CON'T POOH - (BHA) STAND BACK FLEX DC'S - JARS - HWDP - LAY DOWN MWD - BREAK BIT - LAY DOWN MOTOR 01 :00 - 01 :30 0.50 CASE P COMP RIG UP CASING TOOLS - (PJSM ON PICKING UP LINER) 01 :30 - 04:00 2.50 CASE P COMP PICK UP 90 JOINTS 4.5" L-80 12.6# SLOTTED LINER - 2 JOINTS 4.5" L-80 12.6# BLANK LINER - BAKER 5.5" X 7 5/8" HMC LINER HANGER - BAKER 5.5" X 7 5/8" ZXP LINER TOP PACKER - BAKER 7" TIE BACK SLEEVE - BAKER RUNNING TOOL 04:00 - 07:00 3.00 CASE P COMP CON'T RIH WITH LINER ON 4" DRILL PIPE to 12950' 07:00 - 10:00 3.00 CASE N DPRB COMP DROPPED 29/32" BALL AND CIRCULATED DOWN AT 4 BPM. NO PRESSURE INCREASE. WORKED PIPE AND CONTINUED CIRCULATING AT VARIOUS RATE. NO SUCCESS. DROPPED SECOND 29/32" BALL AND DISPLACED DOWN AT 3 BPM. DID NOT BUMP. 10:00 - 10:30 0.50 CASE P COMP DROP 1 3/4" BALL - HANG LINER - SET PACKER - RELEASE FROM LINER 10:30 -14:00 3.50 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH WITH LINER RUNNING TOOL - LAY DOWN RUNNING TOOL 14:00 -17:30 3.50 S1WHIP P PROD2 PJSM - MAKE UP BAKER WHIPSTOCK ASSY - WITH MWD - ORIENT MWD WITH WHIPSTOCK - PICK UP SINGLE DP - 12 DC'S - 17 HWDP - PULSE TEST MWD 17:30 - 21 :30 4.00 S1WHIP P PROD2 TIH WITH WHIPSTOCK TO 8700' (RUNNING SPEED 2 MINS PER STD) 21 :30 - 22:30 1.00 S1WHIP P PROD2 CUT DRILLING LINE - RIG SERVICE 22:30 - 23:00 0.50 S1WHIP P PROD2 RIH WITH WHIPSTOCK @ 8780' - ORIENT TO HIGH SIDE 23:00 - 23:30 0.50 S1WHIP P PROD2 SET BTM ANCHOR - SHEAR OFF DISCONNET WITH 40K DOWN WEIGHT 23:30 - 00:00 0.50 S1WHIP P PROD2 MILLING WINDOW - TOP 8842' TO 8844' - WOM 4K - RPM 80 - TO ON 4K - TO OFF 3K - GPM 261 - PP 1300 - PU 108 - SO 74 10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 MILLING WINDOW FROM 8844' TO 8869' (TOP OF WINDOW Printed: 10/21/2002 8:51:ooAM ') ) BP EXPLORATION Operations Summary Report Page 5 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/11/2002 00:00 - 04:00 4.00 S1WHIP P PROD2 8842' BOTTOM WINDOW 8854') - WOM 3K TO 5K - GPM 261 - PP 1350 - RPM 80 - TO ON 4K - TQ OFF 3K 04:00 - 05:00 1.00 S1WHIP P PROD2 CIRCULATE HI VIS SWEEP - OBSERVE WELL - PUMP DRY JOB - WORK MILLS THROUGH WINDOW - NO DRAG OR OVERPULLS 05:00 - 08:00 3.00 S1WHIP P PROD2 POOH WITH MILLING ASSY. MILL IN GOOD SHAPE AND IN GAUGE 08:00 - 08:30 0.50 S1WHIP P PROD2 FLUSH BOP STACK OF METAL CUTTINGS. FUNCTIONED RAMS AND FLUSHED AGAIN 08:30 - 10:30 2.00 S1WHIP P PROD2 CHANGED PULSER IN MWD. PICKED UP MOTOR SET AT 1.5 DEGREE AND OREINTED. MADE UP 6-1/8" SECURITY RERUN FM2643 PDC BIT. UNLOADED MWD 10:30 - 13:30 3.00 S1WHIP P PROD2 TRIPPED IN HOLE WITH DRILLING ASSEMBLY FILLING DRILL PIPE EVERY 30 STANDS TO 8770'. BROKE CIRCULATION AND ORIENTED MOTOR TO HIGH SIDE. SHUT DOWN PUMP AND TRIPPED THROUGH WINDOW WITH NO PROBLEMS. TAGGED BOTTOM AT 8869' 13:30 - 00:00 10.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 8869' TO 9575' - WOB 3K to 9K - RPM 100 - TO ON 6K - TO OFF 5K - GPM 250 - PP ON 1600 - PP OFF 1550 - PU 11 OK - SO 73K - ROT 92K - (BASE OF OA 9302 - START OF SAND) 10/12/2002 00:00 - 00:00 24.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 9575' TO 12250' - WOB 3K TO 15K - RPM 100 - TQ ON 9K - TQ OFF 8K - GPM 250 - PP ON 2430 - PP OFF 2180 - PU 118K - SO 40K - ROT 83K 10/13/2002 00:00 - 07:00 7.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 12250' TO 12950' - WOB 3K TO 15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON 2450 - PP OFF 2100 - PU 117 - SO 40 - ROT 80 07:00 - 12:00 5.00 CASE P COMP CIRCULATE 4 X - RAISE LUBRICANTS TO 5% IN SYSTEM 12:00 - 16:00 4.00 CASE P COMP PUMP OUT FROM 12950' TO 8870' - PULL TROUGH LINER FROM 8870' TO 8800' WITH OUT PUMP - NO PROBLEMS 16:00 -19:00 3.00 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH TO BHA 19:00 - 20:30 1.50 CASE P COMP STAND FLEX DC'S BACK - DOWN LOAD MWD - FLUSH MOTOR - RE-CONF MOTOR - BREAK OFF BIT - LAY DOWN MOTOR 20:30 - 21 :30 1.00 CASE P COMP PICK UP BAKER WHIPSTOCK RETRIEVING ASSEMBLY - RIH WITH DC'S / HWDP - PULSE TEST MWD 21 :30 - 00:00 2.50 CASE P COMP RIH WITH WHIPSTOCK RETRIEVING TOOL TO 8170' - FILL PIPE EVERY 30 STANDS 10/14/2002 00:00 - 00:30 0.50 CASE P COMP CON'T RIH TO 8774' - WITH RETREIVING TOOLS 00:30 - 01 :00 0.50 CASE P COMP ORIENT TOOL TO HIGH SIDE - RIH TO 8842' - LATCH ONTO WHIPSTOCK - PULL TO 165K - OBSERVE WELL - WELL STATIC - PULL 5 STANDS - PUMP DRY JOB 01 :00 - 04:00 3.00 CASE P COMP POOH TO BHA 04:00 - 06:00 2.00 CASE P COMP LAY DOWN MWD - BAKER RETRIEVING ASSY- LAY DOWN WHIPSTOCK - LAY DOWN RETRIEVING TOOLS 06:00 - 06:30 0.50 CASE P COMP RIG UP CASING TOOLS - PJSM 06:30 - 10:00 3.50 CASE P COMP PICK UP 89 JTS 4.5" 12.6# L-80 SLOTTED LINER - 13 JTS 4.5" 12.6# L-80 SOLID LINER - (TOTAL RUN 102 JTS)(TOTAL FOOTAGE RUN 4091') - BAKER HOOK WALL HANGER WITH 6' TIE BACK SLEEVE - 10:00 -14:30 4.50 CASE P COMP RIH WITH LINER ON 4" DP TO 12911' - RAN 13 STANDS OF 4.75" DC'S /3.5" HWDP 15 STANDS FROM SURFACE FOR Printed: 1012112002 8:51:00 AM ') ) fjPË~P>l..OAATION øp~ratiøn§..~iUmd1ê:1ry. .Re.port Pagé60f 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-29 MPS-29 DRILL +COMPLETE DOYON DOYON 141 Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/14/2002 10:00 - 14:30 4.50 CASE P COMP ADDITIONAL WEIGHT - LINER WENT TO BTM WITHOUT ORIENTION AT WINDOW - HOOK LINER 1ST ATTEMPT ON WINDOW 14:30 - 16:00 1.50 CASE P COMP PUMP BALL TO SEAT - PRESSURE UP TO 2700 PSI - RELEASE BAKER HR SETTING TOOL - BLEED PRESSURE TO 0 - VERIFY RELEASE WITH 6' PICK UP - BLOW BALL SEAT - OPEN CIRC SUB WITH 3700 PSI 16:00 - 16:30 0.50 CASE P COMP POOH 60' - CBU - OBSERVE WELL - WELL STATIC - PUMP DRY JOB 16:30 - 17:30 1.00 CASE P COMP POH - STAND BACK 41 STANDS DRILL PIPE 17:30 - 22:30 5.00 CASE P COMP POH LAYING DOWN 4" DRILL PIPE - (132 JTS) -154.75" DC'S - 15 JTS HWDP 3.5" - LAY DOWN LINER RUNNING TOOL - (TOTAL STANDS IN DERRICK 95 - TOTAL FOOTAGE 8876') 22:30 - 23:00 0.50 BOPSUR P COMP PULL WEAR RING 23:00 - 00:00 1.00 BOPSURP COMP RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250 LOW 5 MINS - 2500 HIGH 5 MINS - ALL OTHER TEST 250 LOW 5 MINS - 4000 HIGH 5 MINS - UPPER IBOP - LOWER IBOP - FLOOR SAFETY VALVES 10/15/2002 00:00 - 02:30 2.50 BOPSUR P COMP TEST BOPS - PIPE RAMS - BLIND RAMS - CHOKE MANIFOLD - HYD VALVE ON CHOKE - HYD VALVE ON KILL - MANUAL VALVE ON CHOKE - MANUAL VALVE ON KILL- ALL TEST WERE GOOD - TEST PRESSURE 250 LOW 5 MINS - 4000 HIGH 5 MINS - (JEFF JONES WITH AOGCC WITNESSED THE BOP TEST) 02:30 - 03:00 0.50 BOPSUR P COMP RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG - INSTALL WEAR RING 03:00 - 06:00 3.00 RUNCOW COMP MAKE UP 3.5" MULE SHOE - RIH 06:00 - 07:30 1.50 RUNCOW COMP CUT DRILL LINE AND SERVICED TOP DRIVE 07:30 - 11 :00 3.50 RUNCOW COMP DISPLACED MUD IN HOLE WITH 600 BBLS OF 8.8 #/GAL OF NACL AND FOLLOWED WITH 450 BBLS OF 9.2 #/GAL NACL. PUMPED 120 SPM AND ROTATED PIPE AT 120 RPM WORKED PIPE FULL STAND. 9.2 BRINE PREHEATED TO 120 DEGREES BEFORE DISPLACEMENT 11 :00 - 18:30 7.50 RUNCOW COMP LAYING DOWN DRILL PIPE, PULL WEAR RING, HOLE TAKING 9.2 BRINE AT THE RATE OF 4 BBLS HR. 18:30 - 19:00 0.50 RUNCOW COMP PJSM, RIG UP TO RUN TUBING 19:00 - 00:00 5.00 RUNCOW COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP COMPLETION TOTAL JTS RUN 55 JTS 2300 FT RUNNING TUBING AT A SLOWER PACE THE NORMAL, WITH THE HOLE TAKING BRINE. LOST TOTAL OF 40 BBLS OF BRINE TO WELL 10/16/2002 00:00 - 07:00 7.00 RUNCOW COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP COMPLETION TOTAL JTS RUN 196 JTS P/U WT 92K S/O WT 65K 07:00 - 08:00 1.00 RUNCOW COMP PICK UP HANGER AND TIE IN 1- WIRE, LAND TUBING, PACKER DEPTH 8123, GLM DEPTH 2214, XN NIPPLE 8168, JET PUMP SENSOR 8095, SLIDING SLEEVE 8076, PRESSURE GAUGE 8055 08:00 - 08:30 0.50 RIGD P COMP TEST lWC TO 1000 PSI 08:30 - 10:00 1.50 RIGD P COMP CHANGE RAMS TO 5" NIPPLE DOWN BOPS 10:00 - 11 :30 1.50 RIGD P COMP NIPPLE UP ADAPTER FLANGE, TEST ADAPTER FLANGE TO 5,000 PSI Printed: 1012112002 8:51:ooAM ') ') Bp>..E~PbQAATIQN OperéltionSSi8.jAJR1é1ryReport Legal Well Name: MPS-29 Common Well Name: MPS-29 Event Name: DRILL +COMPLETE Contractor Name: DOYON Rig Name: DOYON 141 - To Hours Task Code NPT 10/16/2002 11 :30 - 12:30 1.00 RIGD P 12:30 - 13:00 0.50 RIGD P 13:00 - 17:30 4.50 RIGD P 17:30 - 18:30 1.00 RIGD P 18:30 - 19:30 1.00 RIGD P 19:30 - 20:30 1.00 RIGD P 20:30 - 22:00 1.50 RIGD P 22:00 - 22:30 0.50 RIGD P 22:30 - 00:00 1.50 RIGD P Phase COMP COMP COMP COMP COMP COMP COMP COMP COMP Start: 9/29/2002 Rig Release: 10/16/2002 Rig Number: 141 Spud Date: 9/30/2002 End: 10/16/2002 Description of Operations NIPPLE UP 41/16 CIW TREE AND TEST TO 5.000 PSI PULL TWC WITH LUBRICATOR RIG UP HB&R CIRC 9.3 BRINE AND WARM TO 100 DEGREES DROP BALL. PRESSURE UP TO 4,000 PSI TO SET PACKER AND TEST TUBING, RECORD FOR 30 MIN. BLEED PRESSURE IN TUBING TO 3,000 PSI AND PRESSURE ANNULUS TO 4,500 PSI, RECORDED FOR 30 MIN. BLEED TUBING PRESS TO 2,000 AND SHEARED RP VALVE, PUMP 82 BBLS OF DIESEL DOWN ANNLUS TO FREEZE PROTECT WELL LET DIESEL U-TUBE IN TO TUBING RIG UP LUBRICATOR AND SET BPV SECURE TREE. CLEAN CELLAR AND PITS RIG RELEASE TO MOVE TO MPS-19 @ 24:00 10/16/2002 Printed: 10/21/2002 8:51:ooAM AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re:Distribution of Survey Data for Well MPS-29L1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 8,792.06' MD Window / Kickoff Survey 8,842.00' MD (if applicable) Projected Survey: 12,950.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED NOV 0 ì , Attachment(s) AJ¡:9KS. (V v J;¡ \.'\ .' , * ~"< ':'!.~¡.,......~ /:' f"-.J,., .. ., .¡~ ,,;¡;.w'!~ ". ... : I JfJlt,::.. '~.I d Q9~/9~ 31-0ct-02 Sperry-Sun Ðrilling Services Mllne:;Po;nt Unit 'IIPXA Miln. " t MPS 1 Job No. AKZZ22160iSU,.".yed: 13 October, 2002 SUI¥1 lIeport 28 OfJ.IØbjr, 2002 Your Ref: API 500292311960 Surface Coordinates: 5999936.18N, 565670.94£ (70° 24' 36.9759" N, 149027'54.9398" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to ProJeçt H Reference: 999936.18 N, 65670.94 E (Grid) Surface Coord/na- relative. to Structure: 32.89 S, 674.38 W(True) Kelly EJu$hl"g:6Jf4f(1ft~ve Mean Sea Level Elevation relatlvè'1ø}...'V Reference: 66.60ft Elevation 'ØtQ.;$tructure: 66.6Oft ~,.....'.,.'..t.'...,',',...'".M,.........,J',.!.,.,.....3",.,;.....'....-.",...,,!.I.:...'..'..;..".".'.".'.,:......'..-.:..'.,-...1"...,...,. ".".....,...,.......... un C.';z~f,""I'."" "'"" "-,--',.,-. è;'!~""---'--~-~":-",-~--;::_---"-,, .-"-, ,'-- ..'-.- '-'. O"~'t,/,é..~:-;" ' '"VleS"s , " A' . .lIburton Company DEF"N T'VE '~' '~ Survey Ref: svy10206 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29L 1 Your Ref: AP15fJ0292311960 Job No. AKZZ22160, Surveyed: 13 October, 2002 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth, Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 8792.09 87,350 336,610 4105.86 4172.46 5999.41 N 3414.64 W 6005905.33 N 562203.68 E 6355.88 Tie On Point -8842.00 87.580 338.250 4108.07 4174.67 - 6045.45 N 3433.78 W 6005951.20 N 562184.14 E 3.315 6403.84 Window Point 8887.69 92.090 339.580 4108.20 4174.80 . . 6088.07 N 3450.21 W 6005993.67 N 562167.33 E 10.291 6448.08 8936.67 94.810 341.000 4105.25 4171.85 6134.09 N 3466.70 W 6006039.55 N 562150.44 E 6.262 6495.71 8980,62 93.200 342.280 4102.19 4168.79 6175.70N 3480.51 W 6006081.03 N 562136.26 E 4.675 6538.64 9029.99 91.970 345.550 4099.96 4166.56 6223.08 N 3494.17 W 6006128.29 N 562122.19 E 7.070 6587.29 - 9074.88 92.530 345.990 4098.20 4164.80 6266.56 N 3505.20 W 6006171.67 N 562110.78 E 1.586 6631.75 9124.94 93.630 346.070 4095.51 4162.11 6315.06N 3517.27 W 6006220.07 N 562098.28 E 2.203 6681.34 9168.74 93.940 350.660 4092.61 4159.21 6357.86 N 3526.08 W 6006262.79 N 562089.10 E 10.480 6724.87 9218.54 93.260 351.110 4089.49 4156.09 6406.93 N 3533.95 W 6006311.79 N 562080.79 E 1.636 6774.52 9261.84 92.580 355,190 4087.28 4153.88 6449.86 N 3539.11 W 6006354.67 N 562075.26 E 9.540 6817.76 9310.65 93.640 0.350 4084.63 4151.23 6498.54 N 3641.00 W 6006403.34 N 562072.93 E 10.777 6866.33 9355.56 92.090 4.960 4082.38 4148.98 6543.33 N 3538.93 W 6006448.15 N 562074.62 E 10.817 6910.58 9404,34 89,140 7.770 4081.86 4148.46 6591.80 N 3533.52W 6006496.66 N 562079.60 E 8.351 6958.08 9449.08 88.220 13.470 4082.89 4149.49 6635.74 N 3525.28 W 6006640.67 N 562087.45 E 12.902 7000.77 9500.96 87.660 16.200 4084.76 4151.36 6685.86 N 3512.01 W 6006590.90 N 562100.28 E 5.368 7049.00 9542.18 87.230 11.830 4086.60 4153.20 6725.80 N 3502.04 W 6006630.93 N 562109.90 E 10.642 7087.51 9595.90 89.940 14.880 4087.92 4154.52 6778.04 N 3489.63W 6006683.28 N 562121.84 E 7.593 7137.96 9636.80 90.490 20.080 4087.77 4154.37 6817.04 N 3477.35W 6006722.38 N 562133.78 E 12.785 7175.26 9684,34 90.430 26.330 4087.39 4153.99 6860.71 N 3458.63W 6006766.21 N 562152.12 E 13.147 7216.46 9728."16 88.640 31 ,930 4087.75 4154.35 6899.49 N 3437.02 W 6006805.19 N 562173.39 E 13.234 7252.46 9777,35 89,570 38.010 4088.51 4155.11 6939.29 N 3409.19 W 6006845.22 N 562200.87 E 12.657 7288.75 9822.89 87.350 41,610 4089.73 4156.33 6974.25 N 3380.05 W 6006880.44 N 562229.70 E 9.285 7320.08 9871.37 87,720 47,710 4091.82 4158.42 7008.68 N 3346.02 W 6006915.17 N 562263.43 E 12.594 7350.33 ~ 9915,65 88.520 53.480 4093.27 4159.87 7036.76 N 3311.84W 6006943.55 N 562297.36 E 13.148 7374.24 9962,64 87.970 54.460 4094.71 4161.31 7064.39 N 3273.85 W 6006971.51 N 562335.10 E 2.391 7397.26 10010.26 88.71 0 52.180 4096.09 4162.69 7092.82 N 3235.68W 6007000.28 N 562373.02 E 5.032 7421.06 1 0059,1 0 89.390 53.110 4096.90 4163.50 7122.45 N 3196.87 W 6007030.25 N 562411.57 E 2.359 7445.97 10102.53 89.570 52,720 4097.29 4163.89 7148.64 N 3162.22 W 6007056.74 N 562445.99 E 0.989 7467.95 10149.92 89.020 55,190 4097.88 4164.48 7176.52 N 3123.91 W 6007084.96 N 562484.05 E 5.339 7491.19 10195.44 87,540 55.420 4099.24 4165.84 7202.42 N 3086.50 W 6007111.18 N 562521.23 E 3.290 7512.56 10244.12 86.610 56.080 4101.73 4168.33 7229.78 N 3046.32 W 6007138.89 N 562561.17 E 2.342 7535.06 10289.49 87.170 55,750 4104,19 4170.79 7255.17 N 3008.80 W 6007164.61 N 562598.4 7 E 1 .432 7555.91 10337,05 86.430 54.600 4106.84 4173.44 7282.29 N 2969.82 W 6007192.07 N 562637.21 E 2.872 7578.31 10382.75 86~250 54,730 4109,76 4176.36 7308.66 N 2932.61. W 6007218.77 N 562674.18 E 0.486 7600,18 28 October, 2002 - 15:14 P,ge 20t5 DriJIQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29L 1 Your Ref: API 500292311960 Job No. AKZZ22160, Surveyed: 13 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth locI. Azim. Depth Depth, Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 10431.65 84.890 52,560 4113.54 4180.14 7337.56 N 2893.35 W 6007248.02 N 562713.19 E 5.226 7624.31 10476.34 85.010 53.090 4117.47 4184.07 7364.46 N 2857.88 W 6007275.23 N 562748.42 E 1.211 7646.90 10524.97 85.560 52.600 4121.47 4188.07 .. 7393.73 N 2819.25 W 6007304.84 N 562786.79 E 1.512 7671.48 10569.66 87.100 51 .130 4124.33 4190.93 7421.27 N 2784.17 W 6007332.68 N 562821.62 E 4.759 7694.76 10618.18 85.750 48.570 4127.36 4193.96 7452.49 N 2747.16 W 6007364.23 N 562858.36 E 5.956 7721.46 10662.83 86.250 46.360 4130.47 4197.07 7482.60 N 2714.34 W 6007394.62 N 562890.91 E 5.063 7747.55 '~ 10713.51 87.170 46.440 4133.38 4199.98 7517.49 N 2677.70 W 6007429.84 N 562927.24 E 1.822 7777 .94 10756.67 87.850 46.550 4135.26 4201.86 7547.18 N 2646.43 W 6007459.79 N 562958.25 E 1.596 7803.78 10805.75 87.970 45.760 4137.05 4203.65 7581.15 N 2611.06 W 6007494.08 N 562993.33 E 1.627 7833.41 10849.54 87.900 45.080 4138.62 4205.22 7611.87 N 2579.89 W 6007525.07 N 563024.22 E 1.560 7860.30 10898.97 86.980 43.430 4140.83 4207.43 7647.23 N 2545.43W 6007560.74 N 563058.37 E 3.819 7891.41 10943.70 88.090 44.290 4142.76 4209.36 7679.46 N 2514.46 W 6007593.23 N 563089.05 E 3.138 7919.81 10993.66 88.710 45.580 4144.15 4210.75 7714.81 N 2479.19 W 6007628.89 N 563124.01 E 2.864 7950.82 11037.51 88.590 43.990 4145.18 4211.78 7745.92 N 2448.31W 6007660.27 N 563154.62 E 3.635 7978.13 11087.51 88.220 42.600 4146.58 4213.18 7782.30 N 2414.04 W 6007696.95 N 563188.57 E 2.876 8010.28 11131 .04 88.400 41.860 4147.86 4214.46 7814.51 N 2384.79 W 6007729.42 N 563217.53 E 1.749 8038.87 11180.89 88.220 40.430 4149.33 4215.93 7852.04 N 2352.01 W 6007767.23 N 563249.98 E 2.890 8072.33 11224.37 88.340 39.650 4150.63 4217.23 7885.31 N 2324.05 W 6007800.75 N 563277.65 E 1.814 8102.12 11274.31 88.280 39.090 4152.11 4218.71 7923.90 N 2292.39 W 6007839.62 N 563308.97 E 1.127 8136.77 11317,78 86.120 41 .130 4154.23 4220.83 7957.10 N 2264.42 W 6007873.07 N 563336.65 E 6.831 8166.49 11369.35 85.130 39.710 4158.16 4224.76 7996.25 N 2231.08 W 6007912.50 N 563369.64 E 3.350 8201.49 114 11 .00 84.700 40.660 4161.86 4228.46 8027.94 N 2204.31 W 6007944.43 N 563396.13 E 2.496 8229.86 11460.22 85.870 43.310 4165.90 4232.50 8064.40 N 2171.50 W 6007981.17 N 563428.62 E 5.869 8262.25 11505.01 88.210 44.700 4168.22 4234.82 8096.57 N 2140.43 W 6008013.62 N 563459.41 E 6.074 8290.59 11554.72 88.950 45.410 4169.45 4236.05 8131.67 N 2105.25W 6008049.03 N 563494.27 E 2.063 8321.36 11598.17 89.260 46.090 4170.13 4236.73 8161.99 N 2074.13 W 6008079.62 N 563525.12 E 1.720 8347.85 11647.83 89.630 45.120 4170.61 4237.21 8196.73 N 2038.65W 6008114.67 N 563560.30 E 2.090 8378.23 11691.26 88.210 45.460 4171.43 4238.03 8227.28 N 2007.79W 6008145.49 N 563590.88 E 3.362 8404.98 11740.14 87.600 44.330 4173.21 4239.81 8261.88 N 1973.32W 6008180.39 N 563625.06 E 2.626 8435.34 11784.44 88.280 44.310 4174.81 4241.41 8293.55 N 1942.39 W 6008212.33 N 563655.71 E 1.536 8463.20 11834. 1 5 86.860 43.310 4176.91 4243.51 8329.39 N 1908.01 W 6008248.47 N 563689.77 E 3.493 8494.79 11877.98 87.040 43.670 4179.25 4245.85 8361.15 N 1877.88W 6008280.49 N 563719.61 E 0.917 8522.83 11927.81 87.850 44.650 4181.47 4248.07 8396.86 N 1843.20W 6008316.51 N 563753.98 E 2.550 8554.26 11971,10 88.650 45.220 4182.79 4249.39 8427.49 N 1812.64W 6008347.40 N 563784.27 E 2.269 8581.13 12021.57 88.520 44.650 4184.03 4250.63 8463.21N 1777.(n,W 6008383.43 N 563819.59 E 1.158 8612.46 28 October, 2002 - 15:14 Pflge30f5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for MIlne Point MPS - MPS-29L 1 Your Ref: API 5OØ292311960 Job No. AKZZ22160, Surveyed: 13 Octobèr, 2002 BP EXPLORA T/ON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth. Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 12064.92 88.950 43.960 4184.99 4251.59 8494.22 N 1746.74 W 6008414.71 N 563849.59 E 1.875 8639.74 12114.58 89.570 45.650 4185.63 4252.23 8529.45 N 1711.74 W 6008450.25 N 563884.27 E 3.625 8670.66 12158.64 89A50 45.260 4186.01 4252.61 .. 8560.36 N 1680.34 W 6008481.43 N 563915.39 E 0.926 8697.71 12209.14 89.750 44.240 4186.36 4252.96 8596.22 N 1644.79 W 6008517.60 N 563950.63 E 2.105 8729.19 12251.21 87 A20 45.130 4187 AO 4254.00 8626.12 N 1615.22 W 6008547.76 N 563979.94 E 5.928 8755A5 12298.54 86.300 46.020 4189.99 4256.59 8659.20 N 1581.47 W 6008581.14 N 564013.39 E 3.021 8784.38 - 12344.70 87.170 46.920 4192.62 4259.22 8690.94 N 1548.06 W 6008613.17 N 564046.52 E 2.709 8812.01 12391 A7 87.110 47.310 4194.96 4261.56 8722.73 N 1513.83 W 6008645.26 N 564080.47 E 0.843 8839.60 12437.95 86.620 48.230 4197.50 4264.10 8753.92 N 1479.47 W 6008676.75 N 564114.56 E 2.240 8866.59 12486.36 87.540 49.750 4199.96 4266.56 8785.64 N 1442.99 W 6008708.79 N 564150.76 E 3.667 8893.85 12530.84 87.970 49.470 4201.71 4268.31 8814.44 N 1409.13 W 6008737.89 N 564184.36 E 1.153 8918.52 12580.39 88.590 51.710 4203.19 4269.79 8845.88 N 1370.87 W 6008769.67 N 564222.34 E 4.689 8945.30 12624.51 89.020 51.210 4204.11 4270.71 8873.37 N 1336.37 W 6008797.45 N 564256.60 E 1.495 8968.58 12672.92 89A50 51.260 4204.76 4271.36 8903.67 N 1298.63 W 6008828.09 N 564294.08 E 0.894 8994.29 12717.39 89.320 49.900 4205.24 4271.84 8931.91 N 1264.28 W 6008856.63 N 564328.18 E 3.072 9018.34 12763A4 89.200 49.370 4205.83 4272.43 8961.73 N 1229.19 W 6008886.76 N 564363.00 E 1.180 9043.88 12810.84 89.630 50.900 4206.32 4272.92 8992.11 N 1192.81 W 6008917.46 N 564399.11 E 3.353 9069.82 12879.05 89.630 49.740 4206.76 4273.36 9035.66 N 1140.32 W 6008961.47 N 564451.22 E 1.701 9106.97 12950.00 89.630 49.740 4207.22 4273.82 9081.51 N 1086.18W 6009007.79 N 564504.96 E 0.000 9146.21 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). ---/ Vertical Section is from Well and calculated along an Azimuth of 353.320° (True). Magnetic Declination at Surface is 25.734°(29-Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.00ft., The Bottom Hole Displacement is 9146.24f1., in the Direction of 353.180° (True). 28 October, 2002 - 15:14 Pffge4ôf5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29L 1 Your Ref: API 500292311960 Job No. AKZZ22160, Surveyed: 13 October, 2002 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastlngs (ft) (ft) (ft) ... Comment 8792.09 8842.00 12950.00 4172.46 4174.67 4273.82 5999.41 N 6045.45 N 9081.51 N 3414.64 W 3433.78 W 1086.18 W Tie On Point Window Point Projected Survey ~' Survey too/øroqram for MPS-29L 1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 178.00 0.00 178.00 178.00 12950.00 178.00 AK-1 BP _HG(MPS-29) 4273.82 AK-6 BP _IFR-AK(MPS-29) --/ 28 October, 2002 - 15:14 P.ge50f5 DrillQuest 3.03.02.002 ') ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-29L 1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 8,792.09' MD Window / Kickoff Survey 8,842.00' MD (if applicable) Projected Survey: 12,950.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~~--Jqlo 31-0ct-02 R:. !\:C,'l".''\,' rr-I"\ IT;"" r..".,.., ~ ,,~J v/}~q ] .:.i:;""" ...'L_~ ~!<. Pi ß ~ VI t4..:::;.."":J¡'lðtlw..' ,,10\1 t"'¡'" t'. '-',,'1 ~ V . I ¡ L.", IJ2~k~ O¡i f', Sperry-Sun Drilling Services Milne <Point Unit SPXA Milne Point MPS . f.,1MWD ~ Job No.AKAfW221.SulWyed: 13 October, 2002 SUIVA . lIeport 2B~'ì2002 Your R.f:API6D0292311960 Surface Coordinates: 5999936.18 N, 561flO.94E (700 24' 36.9759" H, 149027' 54.9398" W) Grid Coordinate System:IlAD27 Alaska State Planes, Zone 4 ~. Surface Coordinates relatIve to ProJecJH Reference: 999936.18 H, 65670.94 E (Grid) Surface CoordJnatesrela $tryotpre: 32.89 S, 674.38 W(True) K,IIYllu'ÞI"'::ØQMeAfean Sea Level ElevatlOnfflj' ,">'1l,Reference: 66.60ft Elevatlon r.1..,.tiltructure: 66.6Oft ,'.- -...... ,.'1.. .'!~.c.t'!:...L.........'.-.1If....,.'.'{i..~Ic.:...,....,... '.."....-X;:......'.">.. ."'....." .... ..... ,.l~ ,,' ",t~" :r:"""'r~...n I ~:I;IIt;jh~~_(,>,i ,-., 'VIe:" Š , "A Halliburton Company Survey Ref: svy10208 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29L 1 MWD Your Ref: AP/500292311960 Job No. AKMW2216tJ, .. Surveyed: 13 October, 2002 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8792.09 87.350 336.900 4105.91 4172.51 6027.48 N 3356.06 W 6005933.92 N 562262.01 E 6376.96 Tie On Point 8842.00 87.580 338.250 4108.11 4174.71 6073.57 N 3375.08 W 6005979.84 N 562242.59 E 2.741 6424.95 Window Point 8887.69 92.090 339.580 4108.24 4174.84 H 6116.19 N 3391.51W 6006022.32 N 562225.78 E 10.291 6469.19 8936.67 94.810 341.000 4105.30 4171.90 6162.21 N 3408.00 W 6006068.19 N 562208.89 E 6.262 6516.81 8980.62 93.200 342.280 4102.23 4168.83 6203.82 N 3421.81 W 6006109.68 N 562194.72 E 4.675 6559.75 9029.99 91.970 345.550 4100.00 4166.60 6251.20 N 3435.47 W 6006156.94 N 562180.64 E 7.070 6608.39 - 9074.88 92.530 345.990 4098.24 4164.84 6294.68 N 3446.50 W 6006200.32 N 562169.23 E 1.586 6652.86 9124.94 93.630 346.490 4095.55 4162.15 6343.24 N 3458.39 W 6006248.76 N 562156.91 E 2.413 6702.47 9168.74 93.940 350.950 4092.66 4159.26 6386.08 N 3466.93 W 6006291.53 N 562147.99 E 10.185 6746.02 9218.54 93.260 351.480 4089.53 4156.13 6435.20 N 3474.52 W 6006340.58 N 562139.97 E 1.730 6795.69 9261.84 92.580 355.640 4087.32 4153.92 6478.16 N 3479.37 W 6006383.50 N 562134.74 E 9.723 6838.92 9310.65 93.640 0.750 4084.67 4151.27 6526.86 N 3480.91 W 6006432.18 N 562132.78 E 10.677 6887.47 9355.56 92.090 5.350 4082.43 4149.03 6571.64 N 3478.52 W 6006476.98 N 562134.77 E 10.796 6931.66 9404.34 89.140 8.180 4081.90 4148.50 6620.06 N 3472.78 W 6006525.45 N 562140.09 E 8.380 6979.09 9449.08 88.220 13.980 4082.93 4149.53 6663.94 N 3464.18 W 6006569.40 N 562148.30 E 13.122 7021.67 9500.96 87.660 16.750 4084.80 4151.40 6713.93 N 3450.45 W 6006619.51 N 562161.59 E 5.444 7069.72 9542.18 87.230 12.640 4086.64 4153.24 6753.75 N 3440.00 W 6006659.42 N 562171.69 E 10.015 7108.06 9595.90 89.940 15.670 4087.96 4154.56 6805.81 N 3426.87 W 6006711.60 N 562184.36 E 7.566 7158.24 9636.80 90.490 20.960 4087.81 4154.41 6844.63N 3414.02 W 6006750.52 N 562196.86 E 13.004 7195.29 9684.34 90.430 27.480 4087.43 4154.03 6887.96 N 3394.53 W 6006794.03 N 562215.97 E 13.715 7236.06 9728.76 88,640 32.700 4087.79 4154.39 6926.38 N 3372.27 W 6006832.64 N 562237.90 E 12.422 7271.63 9777.35 89.570 38.580 4088.55 4155.15 6965.84 N 3343.98 W 6006872.35 N 562265.85 E 12.250 7307.54 9822.89 87.350 42.280 4089.77 4156.37 7000.49 N 3314.46 W 6006907.25 N 562295.06 E 9.472 7338.51 ,-/ 9871.37 87.720 48.160 4091.86 4158.46 7034.59 N 3280.09 W 6006941.66 N 562329.12 E 12.141 7368.39 9915.65 88.520 53.640 4093.31 4159.91 7062.49 N 3245.76 W 6006969.86 N 562363.20 E 12.500 7392.10 9962.64 87,970 54.590 4094.75 4161.35 7090.02 N 3207.71 W 6006997.72 N 562401.01 E 2.335 7415.02 10010.26 88.710 52.010 4096.13 4162.73 7118.46 N 31.69.55 W 6007026.50 N 562438.92 E 5.634 7438.83 10059.10 89.390 53.090 4096.94 4163.54 7148.16 N 3~30.78 W 6007056.53 N 562477.43 E 2.613 7463.82 10102.53 89.570 53.050 4097.34 4163.94 7174.25 N 3096.07 W 6007082.93 N 562511.91 E 0.425 7485.69 10149.92 89.020 55.430 4097.92 4164.52 7201.94 N 3'057.62 W 6007110.96 N 562550.12 E 5.154 7508.72 10195.44 87.540 55.780 4099.29 4165.89 7227.64 N 3020.07 W 6007136.99 N 562587.43 E 3.341 7529.88 10244.12 86.610 56.060 4101.77 4168.37 7254.88 N 2979.81 W 6007164.58 N 562627.46 E 1.995 7552.26 10289.49 87.170 56.110 4104.23 4170.83 7280.16 N 2942.21 W 6007190.19 N 562664.83 E 1.239 7572.99 10337.05 86.430 54.990 4106.89 4173.49 7307.02 N 2903.06 W 6007217.39 N 562703.75 E 2.819 7595.11 10382.75 86.250 54.350 4109.80 4176.40 7333.40 N 2865.85 W 6007244.09 N 562740.72 E 1.452 7616.98 28 October, 2002 - 15:23 Page 20f5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for MIlne Point MPS - MPS..29L 1 MWD Your Ref: .API500292311960 Job No. AKMW22160, Surveyed: 13 October, 2002 BP EXPLORA T/ON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth, Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 10431.65 84,890 52.730 4113.58 4180.18 7362.37 N 2826.64 W 6007273.41 N 562779.68 E 4.318 7641.19 10476.34 85.010 52.600 4117.51 4184.11 7389.37 N 2791.24 W 6007300.72 N 562814.83 E 0.395 7663.89 10524.97 85.560 52.300 4121.51 4188.11 .. 7418.90 N 2752.82 W 6007330.59 N 562853.00 E 1.287 7688.76 10569.66 87.100 50.780 4124.37 4190.97 7446.64 N 2717.90 W 6007358.63 N 562887.67 E 4.837 7712.24 10618.18 85.750 48.870 4127.40 4194.00 7477.88 N 2680.90 W 6007390.20 N 562924.39 E 4.814 7738.97 10662.83 86.250 46.430 4130.51 4197.11 7507.88 N 2647.99 W 6007420.49 N 562957.04 E 5.565 7764.94 ~. 10713.51 87.170 46.350 4133.42 4200.02 7542.78 N 2611.35 W 6007455.71 N 562993.37 E 1.822 7795.34 10756.67 87.850 46.770 4135.30 4201.90 7572.43 N 2580.04 W 6007485.63 N 563024.42 E 1.851 7821.14 10805.75 87.970 45.950 4137.09 4203.69 7606.28 N 2544.55 W 6007519.79 N 563059.61 E 1.687 7850.63 10849.54 87,900 45.250 4138.67 4205.27 7636.89 N, 2513.28 W 6007550.68 N 563090.61 E 1.605 7877.41 10898.97 86.980 43.630 4140.87 4207.47 7672.15 N 2478.71 W 6007586.24 N 563124.87 E 3.766 7908.40 10943.70 88.090 44.490 4142.80 4209.40 7704.26 N 2447.63 W 6007618.62 N 563155.66 E 3.138 7936.68 10993.66 88.710 45.670 4144.19 4210.79 7739.53 N 2412.27 W 6007654.20 N 563190.71 E 2.667 7967.59 11037.51 88.590 44.260 4145.22 4211.82 7770.54 N 2381.29 W 6007685.48 N 563221.42 E 3.226 7994.79 11087.51 88.220 43.010 4146.62 4213.22 7806.71 N 2346.80W 6007721.96 N 563255.59 E 2.606 8026.71 11131.04 88.400 42.280 4147.90 4214.50 7838.72 N 2317.33 W 6007754.22 N 563284.78 E 1.727 8055.07 11180.89 88.220 40.790 4149.37 4215.97 7876.02 N 2284.29 W 6007791.81 N 563317.49 E 3.009 8088.27 11224.37 88.340 40.180 4150.68 4217.28 7909.07 N 2256.07 W 6007825.11 N 563345.41 E 1.429 8117.82 11274.31 88.280 39.520 4152.15 4218.75 7947.40 N 2224.08 W 6007863.71 N 563377.06 E 1.326 8152.16 11317.78 86.120 41.640 4154.27 4220.87 7980.37 N 2195.84 W 6007896.93 N 563405.01 E 6.958 8181.62 11369.35 85.130 40.280 4158.21 4224.81 8019.20 N 2162.14 W 6007936.06 N 563438.38 E 3.256 8216.27 11411.00 84.700 41.070 4161.90 4228.50 8050.66 N 2135.10 W 6007967.76 N 563465.14 E 2.153 8244.37 11460.22 85.870 43.540 4165.94 4232.54 8086.93 N 2102.08 W 6008004.32 N 563497.83 E 5.537 8276.56 11505.01 88.210 45.140 4168.26 4234.86 8118.92 N 2070.82 W 6008036.58 N 563528.81 E 6.326 8304.69 "-'" 11554.72 88.950 45.910 4169.49 4236.09 8153.74 N 2035.37 W 6008071.71 N 563563.96 E 2.148 8335.15 11598.17 89.260 46.330 4170.17 4236.77 8183.85 N 2004.05 W 6008102.09 N 563595.01 E 1.201 8361.41 11647.83 89.630 45.620 4170.65 4237.25 8218.36 N 1968.35 W 6008136.92 N 563630.41 E 1.612 8391.54 11691.26 88.210 45.870 4171.47 4238.07 8248.66 N 1937.25 W 6008167.49 N 563661.24 E 3.320 8418.01 11740.14 87.600 44.660 4173.25 4239.85 8283.04 N 1902.55W 6008202.17 N 563695.64 E 2.771 8448.12 11784.44 88.280 44.740 4174.85 4241.45 8314.51 N 1871.41 W 6008233.91 N 563726.50 E 1.546 8475.76 11834.15 86.860 43.820 4176.95 4243.55 8350.07 N 1836.73 W 6008269.77 N 563760.86 E 3.403 8507.04 11877.98 87.040 44.190 4179.29 4245.89 8381.55 N 1806.33 W 6008301.52 N 563790.99 E 0.938 8534.77 11927.81 87.850 45.130 4181.51 4248.11 8416.96 N 1771.34 W 6008337.24 N 563825.66 E 2.489 8565.86 11971.10 88.650 45.770 4182.83 4249.43 8447.31 N 1740.50 W 6008367.86 N 563856.23 E 2.366 8592.43 12021,57 88~520 45.180 4184.08 4250.68 8482.69 N 1704.53 W 6008403.55 N 563891.89 E 1.197 8623.38 28 October, 2002 - 15:23 Page 3 of5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-29L 1 AfWD Your Ref: API 500292311960 Job No. AKMW22160, Surveyed: 13 October, 2002 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 12064.92 88.950 44.470 4185.03 4251.63 8513.43 N 1673.98 W 6008434.56 N 563922.17 E 1.914 8650.36 12114.58 89.570 46.270 4185.67 4252.27 8548.31 N 1638.64 W 6008469.75 N 563957.20 E 3.833 8680.89 12158.64 89.450 45.850 4186.05 4252.65 . . 8578.88 N 1606.92 W 6008500.60 N 563988.65 E 0.991 8707.57 12209.14 89.750 44.990 4186.40 4253.00 8614.33 N 1570.95 W 6008536.36 N 564024.31 E 1.804 8738.59 12251.21 87.420 46.030 4187.44 4254.04 8643.80 N 1540.95 W 6008566.10 N 564054.05 E 6.065 8764.37 12298.54 86,300 46.460 4190.04 4256.64 8676.48 N 1506.81 W 6008599.08 N 564087.89 E 2.534 8792.86 -----/ 12344.70 87.170 47.410 4192.66 4259.26 8707.95 N 1473.15 W 6008630.84 N 564121.28 E 2.788 8820.20 12391.47 87.110 48.060 4195.00 4261.60 8739.37 N 1438.58 W 6008662.56 N 564155.58 E 1.394 8847.38 12437.95 86.620 48.900 4197.54 4264.14 8770.13 N 1403.83 W 6008693.63 N 564190.05 E 2.090 8873.89 12486.36 87.540 50.260 4200.01 4266.61 8801.48 N 1367.02 W 6008725.30 N 564226.58 E 3.389 8900.74 12530.84 87.970 49.810 4201.75 4268.35 8830.02 N 1332.96 W 6008754.14 N 564260.39 E 1.399 8925.14 12580.39 88.590 52.150 4203.24 4269.84 8861.20 N 1294.48 W 6008785.66 N 564298.59 E 4.883 8951.63 12624.51 89.020 51.650 4204.16 4270.76 8888.42 N 1259.77 W 6008813.18 N 564333.07 E 1.495 8974.62 12672.92 89.450 51 .460 4204.80 4271.40 8918.52 N 1221.86 W 6008843.61 N 564370.71 E 0.971 9000.11 12717.39 89.320 50.150 4205.28 4271.88 8946.62 N 1187.40 W 6008872.01 N 564404.92 E 2.960 9024.01 12763.44 89.200 49.460 4205.87 4272.47 8976.34 N 1152.22 W 6008902.04 N 564439.83 E 1.521 9049.43 12810.84 89.630 50.990 4206.36 4272.96 9006.66 N 1115.80 W 6008932.68 N 564475.99 E 3.353 9075.31 12879.05 89.630 49.820 4206.80 4273.40 9050.13 N 1063.24 W 6008976.61 N 564528.17 E 1.715 9112.37 12950.00 89.630 49.820 4207.26 4273.86 9095.91 N 1009.03 W 6009022.86 N 564581.97 E 0.000 9151.53 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes. Zone 4. ~ The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 353.320° (True). Magnetic Declination at Surface is 25.734 O(29-Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.000., The Bottom Hole Displacement is 9151.70f1., in the Direction of 353.670° (True). 28 October, 2002 - 15:23 Page 4 0'5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for MIlne PolntMPS - MPS-2£IL 1 MWD Your Ref: API 500292311960 Job No. AKMW2216fJ, Surveyed: 13 October, 2002 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings . . Comment (ft) (ft) (ft) 8792.09 8842.00 12950.00 4172.51 4174.71 4273.86 6027.48 N 6073.57 N 9095.91 N 3356.06 W 3375.08 W 1009.03 W Tie On Point Window Point Project$d Survey ~. Survey too/øroQram for MPS-29L 1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 178.00 0.00 178.00 178.00 12950.00 178.00 AK-1 BP _HG(MPS-29 MWD) 4273.86 MWD Magnetic(MPS-29 MWD) 28 October, 2002 - 15:23 of5 DrillQuest 3.03.02.002 ~L~IJ! (ûJ~ ~~~~æfA\ '\ AI..ASHA. OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit MPS-29Ll BP Exploration (Alaska), Inc. Permit No: 202-196 Surface Location: 3270' NSL, 340' WEL, Sec. 12, TI2N, RI0E, UM Bottomhole Location: 1899' NSL, 1419' WEL, Sec. 35, TI3N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to redrill the above development well. . This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the. right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well MPU MPS 29, Permit No 202-195, API 50-029-23119. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). ~ Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this.z¿i{day of September, 2002 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. 1 a. Type of work 0 Drill II Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4568' NSL, 3870' WEL, SEC. 01, T12N, R10E, UM (OA) At total depth 1899' NSL, 1419' WEL, SEC. 35, T13N, R10E, UM {OA} 12. Distance to nearest property line 13. Distance to nearest well / ADL 380109,1899' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 9100' MD Maximum Hole Angle 18. Casin~ Program Specifications $Ize Hole CasinQ Weight Grade Couolina 6-1/8" 4-1/2" 12.7# L-80 BTC J' STATE OF ALASKA-> ALASKA L AND GAS CONSERVATION COMt\,..JSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE= 68' Milne Point Unit I Schrader 6. Property Designation Bluff ADL 025518 7. Unit or Property Name Milne Point Unit 8. Well Number /' MPS-29L 1 Number 2S100302630-277 9. Approximate spud dat~ 61- L(cr0¿0T llll U. Þ'~. Amount $200,000.00 14. Number of acres in property 15. Proposed depth {MD and TVD} 2560 13024' MD I 4271' TVD 0 17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)} 94 Maximum surface 1692 psig, At total depth (TVD) 4181'/1880 psig Setting Depth T QP Botom Quantity of Cement Lenath MD TVD MD TVD (include staQe data) 3924' 9100' .42ðtr 13024' 4271' Uncemented Slotted Liner 'fI1' ~ ~~C;~ 1/2. s/o ~ J ¡r - 7/-4-:r- 11. Type Bond (See 20 AAC 25.025) / 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 13023 feet 4331 feet N/ A feet NI A feet Length Plugs (measured) Junk (measured) Size Cemented MD TVD 80' 20" 9389' 7-5/8" 3734' 6-1/8" 260 sx Arctic Set (Approx.) 45 sx PF 'L', 1540 sx Class 'G' 112' 9389' 112' 4191' Uncemented Slotted Liner t\3q¥~' %' 1'; ~~, '\\~: 4331' Perforation depth: measured NIA true vertical NIA 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer NameINumber: Steve Campbel/, 564-4401 Prepared By NameINumber: Sondra Stewman, 564-4750 2L1S~:~:Y ~a~::~t the fOregOiò: :t7correct~~~e~;g~:k;, . Date q /1 b 10 d- Permit Number API Number . /" ....4 Aß(>roval ~at~ See cover letter .z 02. - /,9 b 50- 0 2 ~ - 2. 3 / / / - e::;; C-/ '1 \~ ~.l O~ for other reQuirements Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Requireö 0 Yes SNo Hydrogen Sulfide Measures 0 Yes B No Directional Survey Required EYes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: T~s t- ß 0 P E -k t¡.pOû f~ { ., :)KIGíNAL SIGNED BY by order of 0 Taylor Seamount Commissioner the commission ORIGINAL Approved By Form 10-401 Rev. 12-01-85 Date q ô\(R 0;:( Submit In Triplicate -) IWell Name: MPS-29 L1 Drill and Complete Plan Summary Milne F ~)t MPS-29 Well Permit I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "DB" Surface Location: 2009' FNL, (3270 FSL), 340 FEL, (49391 FWL), SEC. 12, T12N, R10E E=565670.94 N=5999936.18 7111 FNL, (4568' FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E E=562082 N=6006484 2=4161' TVD 33801 FNL, (1899' FSL), 1419' FEL, (3860' FWL), SEC. 35 T13N, R10E E=564514 N=6009115 2=4271' TVD 7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E E=562082 N=6006484 2=4189' TVD 33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E E=564514 N=6009115 2=4250' TVD 33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E E=564514 N=6009115 2=4331' TVD I AFE Number: I I Riq: I Doyon 141 / 1 I Estimated Start Date: 1 SEP 29, 2002 1 I Operatinq days to complete: 113 1 I MD: 113024 1 I TVD: 14271 1 1 Max Inc: 194 1 I KOP: 191001' 1 KBE: 168 1 I Well Desiqn (conventional, slim hole, etc.): I Conventional Grass Roots¡:ML Producer I 1 Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD TOTAL DEPTH I Objective: I Schrader DB Sand Mud Program: 9-7/8" Surface Hole Mud Properties: Density (ppg) Funnel visc VP HTHP Spud - LSND Freshwater Mud pH API Filtrate LG Solids < 6.5 8.6 - 9.20 75 - 150 25 - 60 N/A <8 9.0-9.5 KCL-CaC03 Flow Pro pH API Filtrate LG Sol ids <12 6-1/8" Production Hole Mud Properties: Density (ppg) Funnel visc VP HTHP 8.6 - 9.20 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. 1 ) Milne Pr .') MPS-29 Well Permit Cement Program: Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below aSlS permafrost Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location. Total Cement Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg 50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50 Spacer ppg Lead 45 sx 10.7lb/gal Class L - 4.15 cuft/sx (cement to surface) 1540-sx 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 3496' Tail ~? Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton Evaluation Program: 97/8" Hole Section: Open Hole: Cased Hole: 6-1/8" Hole section: Open Hole: MWD/GRlRES IFRlCASANDRA N/a MWD/GRlRES ABI/IFRlCASANDRA Formation Markers: Formation Tops MDrkb TVDßb . Estimated EMW (ft) (ft) Pore Pressure (pSI) (lb/gal)* Base Permafrost 1,812 1,706 767 8.65 Top Ugnu 3512 1579 8.65 TopUgnuM NA Bottom U gnu NA NA NA 3969 1785 8.65 NB NA 3996 1797 8.65 NC NA 4026 1810 8.65 NE NA 4043 1818 8.65 /(...- NF NA 4091 1840 8.65 q. Top OA NA 4122 1854 8.65 Base OA NA 4147 1865 8.65 Top OB NA 4181 1880 8.65 TD 13023 4312 1939 8.65 2 ,) CasingITubing Program: Milne P ..')1 MPS-29 Well Permit Hole Csg / Size Tbg O.D. 42-in 20-in* 92# 9.875-in 7.625-in 29.7# 6. 125-in 4.5-in 12.7# 6. 125-in 4.5-in 12.7# *The 20" casing is insulated Wt/Ft Grade Top MD / TVDrkb H -40 Welded 80- ft 0 L-80 BTC 9389-ft O-ft L-80 BTC c¿o.324-ft 9100-ft / 4,208-ft L-80 I BTC 3,734-ft 9289-ft / 4,227-ft ?>3q~ y J Conn Length Bottom MD / TVDrkb 112-ft / 112-ft 9389-ft /4191-ft 13024-ft / 4271-ft 13023-ft / 4,331-ft Recommended Bit Program: BHA 1 2 3 Hole Size 9.875-in 9.875-in 6. 125-in Depth (MD) Bit Type Nozzle/Flow rate 3-15 & 1-10 TBD 3 -12 0 - 2,000-ft 2,000 - 9389-ft 9100-ft - TD Hughes MXC-1 TBD Security FM2643 Well Control: . Production hole will be drilled with a diverter. Surface Interval . Maximum anticipated BHP: . Maximum surface pressure: 1880 p, @ 4181' TVDrkb - Top of "OB" 1692 psi @ surface (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) Diverter will be function tested. BOP's:Test annular 250 psi low and 2500 psi high, and rams to 250 psi low and 4,000 psi high."/ N/A 9.2 ppg NaCI / 6.8 ppg Diesel . Planned BOP test pressure: . . Kick tolerance: . Planned completion fluid: Drilling Hazards & Contingencies: Hydrates . Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. . Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being 3 ) Milne ~ "J MPS-29 Well Permit circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation . We do not expect losses while drilling this well. . Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures . It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. Pad Data Sheet . Please Read the S-Pad Data Sheet thoroughly. Breathing .N/A Hydrocarbons . Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults . NA Hydrogen Sulfide . MPS Pad is not designated as an H2S Pad. Anti-collision Issues . MPS-29 has no anti-collision issues. 4 ') DRILL & COMPLETION PROCEDURE Milne P,' ''1 MPS-29 Well Permit Pre- Rig Operations 1. The 20" insulated conductor is installed Procedure /' 1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe 2. Drill 9-7/8" surface hole as per directional plan. 3. Condition mud prior to 7 5/8" casing run. POOH 4. Run and cement 7 5/8" casing from TD to surface. 5. ND Diverter 6. Install FMC 11" 5m horizontal wellhead 7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250 low and 4000 psi high 8. Drill 6-1/8" OB horizontal production hole as per directional plan. 9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. 10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. a. RIH. Orient and set whipstock to place window at top of the OA interval. b. Shear off and mill window thru 7-5/8" casing. 11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud properties and POOH. 12. MU whipstock retrieving tool and pull whipstock ~ 13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing 14. POOH 15. Till and displace out drilling mud with 9.2 ppg N aCI /" 16. POOH 17. Run in hole with 4-1/2" jet pump completion as per schematic 18. Land tubing hanger and test 19. Set BPV 20. ND BOP 21. Install and test tree 22. Pull BPV 23. Drop ball and set production packer 24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi ./ 25. Freeze protect thru GLM 26. Install BPV and secure the well 27. RD/MO 5 TREE: Cameron 4-1/16" 5M f-JHOf-JOSI=LJ COMPLI= liON . WELLHEAD: FMCGen 6 11",5M~\IIPS-?9 P~-?C...."1 1 I Tubing Mead: 11" x 4-1/2",". .J¡ . . -, '" J- FMC Tubing Hanger ~ 112' 20" 92 Ibltt, H-40 Welded Ý Insulated Diesel Freeze protect to 750' MD ~ ~ ~.;:::: , ~ 9-7/8" Hole "- \ 'I, - ----- , '-- 08 Horizontal 6-1/8" hole ------- 9.2 KCI with corrosion inhibitor as packer fluid Jet Pump Installed in Sliding Sleeve Post rig! III , ,,~::,:.' .. . 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 8.5" Burst: 6,890 psi Collapse: 4,790 psi j:~~*.: Window in 7" casing @ 9,100' MO Well Inclination @ Window = 87 Degrees 7.625" Casing Shoe @ 9,389' MD Well Inclination @ Shoe = 90 Degrees PBTD TD DATE 130 Sep 02 REV. BY SKC COMMENTS Level 3 Multi-Lateral, 4-112" Jet Pump Completion KB. ELEV =66.5' Cellar Box ELEV = 38.0' ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD, RP shear valve open position 4-1/2", 12.6 Ib/ft, L-80, IBT-M Coupling 00: 5.2" OriWIO: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi ~ "" . BIW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down to lower sensor) Halliburtion Dura Sleeve XD WIX Nipple (3.813" ID) Phoenix Pressure Gauge (2.840" ID) . i~W.~/~ 7-5/8" x 4-1/2" S-3 Packer I Set @ 8,950' MD, 4150' TVD I 3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod Wireline Entry Guide \~ Multi-Lateral Junction 9,100' 6-1/8" OA Lateral TD 13,024' /' 6-1/8" OB Lateral TD 13,023' ........----- - - - - t ;\ t * t - - OA Horizontal 6-1/8" hole r-- -- - - - - - - - - 4-1/2" Slotted Liner WlHookwall hanger - - - - 4-1/2" Slotted Liner & Hanger Milne Point Unit WI=I I : MPS-?9 API NO: BP Exploratíon (Alaska) ~ BPXA .t...u.,.., ,,~~~~ Milne Point Unit Proposal Data for MPS-29L 1 WP 3.0 Vertlclll Origin : tbrlmrtll Origin : Mel8U'emert lk1Its : North Reference : We' We. ft True North Dogleg -ty : Degrees per 100 feet (US) Vertlclll Section AzlnUh : 353.520° Vertlclll Section Description: We. 9000- Vertlclll Section Origin: 0.00 N,O.OO E MNeur«I IncI. AmI. Vertical Northlng8 E88tlngs Verticil ~ Depth Depth Section 9100.00 87.803 348.430 4180.81 6292.95 N 3502.35 W 6648.oJ 9120.00 89,882 349.629 4181.22 6312.58 N 3506.16 W 6667.94 1'.-"1 9160.47 94.728 349.948 4119.59 6352.37 N 3513.33 W 6708.29 I' ¡III 9222.49 94.728 349.948 4174A8 6413.22 N 3524.1 I W 67~.97 9389.44 94.1XX1 5.1XX1 4161.70 6579.04 N 3531A2 W 6935.56 9955.85 88.040 55.580 4150.91 7051.99 N 3254.88 W 7374.28 10087.45 88.040 55.580 41SSA1 7126.34 N 3146.39 W 7435.90 10117.22 87.1XX1 SS.IXXI 4156.70 7143.27 N 3121.94 W 7449.97 ,.~,N 10148.24 85.971 54.30S 4158.60 7161.18 N 3096.69 W 7464.91 .¡ .... 10559.77 85.971 54.30S 4187.51 7400.71 N 2763.30 W 7665.28 IJ"'. ~ 8000 - 1072\.94 87.S40 48.1XX1 4196.70 7502.22 N 2637.27 W 775\.92 .1'111 10754.16 87.537 46.710 4198.os 7524.02 N 2613.59 W 7770.91 .1'1'1 11263.37 87.537 46.710 4219.97 7872.86 N 2243.28 W 8075.73 ....,. 11307.38 87.960 4S.1XX1 4221.70 7903A9 N 221 \.72 W 8102.61 .II'" (f) 1132\.21 87.961 44.447 4222.1 9 7913.31 N 2202.00 W 811 \.26 J 1111 C) 11905.85 87.961 44.447 4242.99 833OA2 N 1792.87 W 8479.54 11."1 C 12028.02 88.562 39.595 4246.70 8421.11 N 1111.15 W 8S6()A3 J I1II :ë 13024.28 88.562 39.595 4271.70 9188.56 N 1076.38 W 9251.33 l,ilTI 1:: 0 Z 7000- 8 0 0 II s:. .~ 1R 6000 - ~ (f) Scale: 1 inch = 1000ft -3000 I Milne Point MPS DrillQuest- MPS-29 Eastings (Well) -2000 I -1000 I 0 I MPS-2911 16 4271.701VO. 9168.56N, l°il76_38W~, 4263. ~. ~ ..,.~ =l1d Dir, Start Sail @ 88.562° : 12028.02ftMD~4246.70ftTVD egm Dir @ 4.000°/1000: 11905.85ft MD, 42..2.99ft TVD -Total Depth: 13024.28ftMD,4271.7OOTVD ~ MPS.29L 1 14 4221,70 TVO. 7903.49 N. 2211,72 ~Ribi~~rt4~ð8b~1ßbH?'; M1:i\t~B~P~~A9f\Jd'D nd Dir, Start Sail @ 87.53r: 10754.16ftMD,4198.08ftTVD egin Dir @ 4.000°/1000: 10559.77ft MD. 4187.51ft TVD End Dir, Start Sail @ 85.971 ° : 10148.24ftMD,4158.60ftTVD ~in Dir @ 4.0ooo/100ft: 1oo87.45ft MD, 4155.41ft TVD nd Dir, Start Sail @ 88.040°: 9955.85ftMD,4150.91ftTVD 41483 MPS-29L 1 11 4161.70 TVD. .6579,04 N, 3531.42 W ç::Begin Dir @ 9.oo00/1ooft: 9222.49ft MD, 4174.48ftTVD 4180J;:.-end Dir, Start Sail @ 94.672° : 9160.ooftMD,4179.63ftTVD KOP: Start Dir @ 12.0000/1ooft: 9100.ooftMD,4180.81ftTVD \ bp A;\~Oß~~~Q ~Q , \ç ),,.\Jb.4\19'~~ 4\~,g\I\\\~' ,,0 \z,~.~rJf¡/tJß,~<g;;::~<ft}.\\~~~~~~~ ~ \J 'i-rJ~:~~:~:::~~~; ..~~~~~,~\~~~~\~~~tï<t~~\J ,.., ".i.J I ~ _M. /¡¡:!~~J.', ~ ~ : 4,~~'o ~ ~~~l~~;¡,~9fl:<O,:\Z(}'/ß'C "" ","" /',,/"é.f'. ~ "~~ U!' 0 4,""'51"\ 0 "'":,, ~.." w ,..&0......, ~øll>"~øI \)\" ~ Total Depth ' MPS-29L1 12 ~9S'2911 m ~ ImJ» .'$fJO.rKI j /-1, IIJS.29L1 13024.2attMD "",,"NO' ']ONO -',(,. ~"'.. WP10/4271 m,." ~ ,;...:~" ~ ,row w MPS."" H "'" - ~.. .70ffTVD I ;::;;: NO, ",,:'ii'i-:ri F'-"" :':,';~ '" 7500 I . ~ ""." w ,"'." N, ""," W NO, ""." ~ ""." w 8250 (j) s: - 3750- c ã. Q)g ::)10 -,... ~II e-g Q).- >-- iD ~ 4500 - I 6750 Scale: 1 Inch .. 750ft ~oi-\ ) I I 9000 9750 Section Azimuth: 353.5200 (frue North) Vertical Section (Well) DrlllQuest 2.00.09.008 BP EXPLORA TION .~' PXA 'oint MPS, Slot MPS-29 PS-29L 1 WP 3.0 Revised: 10 September, 2002 PROPOSAL REPORT 10 September, 2002 \ ~} Surface Coordinates: 5999936.26 H, 565671.13 E (70024' 36.9767" H, 149027' 54.9342" W) Surface Coordinates relative to Project H Reference: 999936.26 H, 65671.13 E (Grid) Surface Coordinates relative to Structure: 32.81 S, 674.18 W (True) Kelly Bushing: 66. 70ft above Mean Sea Level =4.cJ EI'rwy-!EII.JI1 aJIt.J~lw:tRy, ..'.,."',"',c:"U A """"~Ot#cII...r Proposal Ref: pro 10 182 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) MPS-29 6.0 0.00 0.000 0.000 -66.70 0.00 27.60 0.000 0.000 -39.10 27.60 100.00 0.000 0.000 33.30 100.00 200.00 0.000 0.000 133.30 200.00 300.00 0.000 0.000 233.30 300.00 400.00 1.500 326.000 433.33 2.000 326.000 500.00 3.833 326.000 600.00 6.583 326.000 700.00 9.333 326.000 800.00 12.083 326.000 900.00 14.833 326.0 1000.00 17.583 32 1100.00 20.333 32 1200.00 23 .083.'/~326:' .~ .;:-ii'~' ~~~~t;: ".' ,,';:-":;' ~;1~.8åa~1,,~"326.00Ó.,I" , 1201.78 1268.48 \¿æi5.8~C~~ 326.000 1290.71 1357.41 .~6~090 '~}:- 326.000 1335.64 1402.34 ~~~.30 .8'48 326.000 1377.44 1444.14 ~.598 326.000 1462.50 1529.20 1700.00 34.348 326.000 1545.91 1612.61 1800.00 36.098 326.000 1627.60 1694.30 1900.00 37.848 326.000 1707.49 1774.19 1908.66 38.000 326.000 1714.32 1781.02 2000.00 38.000 326.000 1786.30 1853.00 2036.81 38.000 326.000 1815.30 1882.00 2100.00 40.502 326.572 1864.23 1930.93 2200.00 44.466 327.366 1937.96 2004.66 2300.00 48.435 328.056 2006.85 2073.55 2400.00 52.408 328.666 2070.55 2137.25 10 September, 2002 - 16:15 Sperry-Sun Drilling Services Proposal Report for MPS-29 Revised: 10 September, 2002 Local Coordinates Northlngs Eastlngs (ft) (ft) O.OON O.OON O.OON O.OON O.OON 39.15 N 58.44 N 81.58 N 108.51 N 139.17 N 173.49 N 211.39N 23229 N 252.64 N 296.23 N 341.96 N 389.77 N 439.63 N 444.05 N 490.67 N 509.45 N 542.71 N 599.33 N 660.60 N 726.21 N BPXA Milne Point MPS -'ett.[f'!1~~~:,~,ij. if;;" Global Coordinat.~ "'~~~:i DØgle'g:~ N°7~:ngS \;~i:~y¡{ft~)c Comment t;S;_1~111~'[~ . 565671.13 E 0.00 565671.13 E 0.000 0.00 565671.13 E 0.000 0.00 565671.13 E 0.000 0.00 565671.13 E 0.000 0.00 ..73W 5999937.34 N 565670.39 E 1.500 1.16 1.30W 5999938.18 N 565669.81 E 1.500 2.06 3.20W 5999940.97 N 565667.89 E 2.750 5.07 8.27W 5999948.45 N 565662.75 E 2.750 13.12 16.02 W 5999959.86 N 565654.91 E 2.750 25.40 26.40 W 5999975.17 N 565644.38 E 2.750 41.88 39.42 W 5999994.35 N 565631.20 E 2.750 62.51 55.03 W 6000017.35 N 565615.39 E 2.750 87.27 73.19 W 6000044.12 N 565596.99 E 2.750 116.08 93.87 W 6000074.60 N 565576.04 E 2.750 148.88 117.02W 6000108.72 N 565552.59 E 2.750 185.59 142.59 W 6000146.39 N 565526.69 E 2.750 226.14 156.68 W 6000167.16 N 565512.41 E 2.750 248.49 170.41 W 6000187.40 N 565498.50 E 1.750 270.26 199.81 W 6000230.73 N 565468.72 E 1.750 316.89 230.65 W 6000276.18 N 565437.48 E 1.750 365.80 262.90 W 6000323.71 N 565404.81 E 1.750 416.95 296.54 W 6000373.27 N 565370.74 E 1 .750 470.29 299.51 W 6000377.65 N 565367.72 E 1.750 475.01 330.96 W 6000424.00 N 565335.87 E 0.000 524.88 343.63 W 6000442.67 N 565323.03 E 0.000 544.98 365.82 W 6000475.73 N 565300.56 E 4.000 580.53 402.61 W 6000532.03 N 565263.27 E 4.000 640.94 441.31 W 6000592.95 N 565224.03 E 4.000 706.18 481.72 W 6000658.20 N 565183.05 E 4.000 775.93 Page2of9 DrRlQuest 2.00.09.008 ~$ .[ - '-'-- ( Sperry-Sun Drilling Services Proposal Report for MPS-29 Revised: 10 September, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit "tt 'j:J1~t!~ 'l*~~\ Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinat~ "":' ö<i9le~¥t Depth Incl. Azlm. Depth Depth Northings Eastlngs Northings . '""::;:'i 'q~;,.. J~~te ':",' Comment (ft) (ft) (ft) (ft) (ft) (ft) '(ft)::;¿".. .'t{;)i~:(fftOOft) 2500.00 56.383 329.213 2128.76 2195.46 795.85 N 523.65 W 600072 ,J¡ . ,'P£\ "~;':.. 4.000 849.86 2600.00 60.361 329.713 2181.19 2247.89 869.17 N 566.90 W 600080Õ:4 'J.;Øf~ '9~~'1 E 4.000 927.60 2700.00 64.340 330.174 2227.58 2294.28 945.83 N 611.25~ ,00876.68'N 051.59E 4.000 1008.77 2800.00 68.321 330.606 2267.72 2334.42 1025.44 N 656.49' ,~è-. 6ðø0955.~{~. 565005.65 E 4.000 1092.98 2859.24 70.680 330.850 2288.46 2355.16 1073.84 N .68~;¡;¿ Wf~':::: ~ 564978.10 E 4.000 1144.13 2900.00 70.680 330.850 2301.95 564959.07 E 0.000 1179.63 3000.00 70.680 330.850 2335.03 ." 6001119.49 N 564912.38 E 0.000 1266.70 3100.00 70.680 330.850 2368.12 6001201.50 N 564865.69 E 0.000 1353.78 3200.00 70.680 330.850 2401.20 6001283.51 N 564819.00 E 0.000 1440.86 3300.00 70.680 330.850 2434.29 6001365.51 N 564772.31 E 0.000 1527.94 3400.00 70.680 932.19 W 6001447.52 N 564725.62 E 0.000 1615.01 3500.00 70.680 978.15 W 6001529.53 N 564678.93 E 0.000 1702.09 3600.00 70.680 1024.12 W 6001611.54 N 564632.24 E 0.000 1789.17 3700.00 70.680 1070.09 W 6001693.55 N 564585.55 E 0.000 1876.25 3800.00 70.680 1116.05 W 6001775.56 N 564538.86 E 0.000 1963.33 3900.00 70.680 .7 1931.60 N 1162.02W 6001857.57 N 564492.17 E 0.000 2050.40 4000.00 70. 65.88 2014.02 N 1207.99 W 6001939.58 N 564445.48 E 0.000 2137.48 4100.00 ;JO.,.<, ,':- . . . . 698.96 2096.43 N 1253.95 W 6002021.59 N 564398.79 E 0.000 2224.56 4200.00 ?t.m<.6ag;~f'a30.850'>" 2732.05 2178.85 N 1299.92 W 6002103.60 N 564352.10 E 0.000 2311.64 43 ',i,:70,.-688!~\ 330.850 2765.13 2261.27 N 1345.89 W 6002185.61 N 564305.41 E 0.000 2398.71 !~~l .~)~ ¡:'~~.L- i~~6S0 ~. 330.850 2798.22 2864.92 2343.68 N 1391.85 W 6002267.62 N 564258.72 E 0.000 2485.79 " '. . .680 330.850 2831.30 2898.00 2426.10 N 1437.82 W 6002349.62 N 564212.03 E 0.000 2572.87 70.680 330.850 2864.38 2931.08 2508.52 N 1483.79 W 6002431.63 N 564165.34 E 0.000 2659.95 70.680 330.850 2897.47 2964.17 2590.93 N 1529.75 W 6002513.64 N 564118.65 E 0.000 2747.02 70.680 330.850 2930.55 2997.25 2673.35 N 1575.72 W 6002595.65 N 564071.96 E 0.000 2834.10 4900.00 70.680 330.850 2963.64 3030.34 2755.77 N 1621.69 W 6002677.66 N 564025.28 E 0.000 2921.18 5000.00 70.680 330.850 2996.72 3063.42 2838.18 N 1667.65 W 6002759.67 N 563978.59 E 0.000 3008.26 5100.00 70.680 330.850 3029.81 3096.51 2920.60 N 1713.62 W 6002841.68 N 563931.90 E 0.000 3095.33 5200.00 70.680 330.850 3062.89 3129.59 3003.02 N 1759.59 W 6002923.69 N 563885.21 E 0.000 3182.41 5300.00 70.680 330.850 3095.97 3162.67 3085.43 N 1805.55 W 6003005.70 N 563838.52 E 0.000 3269.49 ~\ ) ,-,/ ¡ 10 September, 2002 - 16:15 Page 3 of 9 DrR/Quest 2.00.09.008 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Depth (ft) Incl. Azim. 5400.00 70.680 330.850 5500.00 70.680 330.850 5600.00 70.680 330.850 5700.00 70.680 330.850 5800.00 70.680 330.850 5900.00 70.680 330.850 6000.00 70.680 330.850 6100.00 70.680 330.850 6200.00 70.680 330.850 6300.00 70.680 330.850 6400.00 70.680 6500.00 70.680 6600.00 70.680 6700.00 70.680 6800.00 70.680 6900.00 7000.00 7100.00 7200.00 73 0 7900.00 70.680 330.850 8000.00 70.680 330.850 8061.86 70.680 330.850 8061.97 70.680 330.850 8100.00 72.192 331.031 10 September, 2002. 16:15 Sub-Sea Depth (ft) 3129.06 3162.14 3195.23 3228.31 3261.40 3294.48 3327.57 3360.65 3393.73 3426.82 3790.75 3823.83 3856.92 3890.00 3923.08 3956.17 3989.25 4009.72 4009.76 4021.86 Vertical Depth (ft) 3195.76 3228.84 3261.93 3295.01 3328.10 3857.45 3890.53 3923.62 3956.70 3989.78 4022.87 4055.95 4076.42 4076.46 4088.56 Sperry-Sun Drilling Services Proposal Report for MPS.29 Revised: 10 September, 2002 Local Coordinates Northings Eastings (ft) (ft) 3167.85 N 3250.27 N 3332.68 N 3415.10 N 3497.52 N 4404.10 N 4486.51 N 4568.93 N 4651.35 N 4733.76 N 4816.18 N 4898.60 N 4981.01 N 5063.43 N 5145.85 N 5228.26 N 5310.68 N 5361.66 N 5361.75 N 5393.27 N 2311.19 W 2357.15 W 2403.12 W 2449.09 W 2495.05 W 2541.02 W 2586.99 W 2632.95 W 2678.92 W 2724.89 W 2770.85 W 2816.82 W 2862.79 W 2908.75 W 2954.72 W 3000.69 W 3046.65 W 3075.09 W 3075.14 W 3092.65 W Page 4 of9 Nor~f~~ coordi~r~...!.,~~' Ä~" -. 6003087c-~71'N' 56, ;, ,,~'E 0.000 600~;~~:;;.~' :} - ;I~:~:~ ~ ~:~~~ 3333. 563651.76 E 0.000 3415.74 N 563605.07 E 0.000 03497.75 N 6003579.76 N 6003661.77 N 6003743.78 N 6003825.79 N 6003907.80 N 6003989.81 N 6004071.82 N 6004153.83 N 6004235.84 N 6004317.85 N 6004399.85 N 6004481.86 N 6004563.87 N 6004645.88 N 6004727.89 N 6004809.90 N 6004891.91 N 6004973.92 N 6005055.93 N 6005137.94 N 6005219.95 N 6005270.68 N 6005270.77 N 6005302.12 N 563558.38 E 563511.69 E 563465.00 E 563418.31 E 563371.62 E 563324.93 E 563278.24 E 563231.55 E 563184.86 E 563138.17 E 563091.48 E 563044.79 E 562998.10 E 562951.41 E 562904.72 E 562858.04 E 562811.35 E 562764.66 E 562717.97 E 562671.28 E 562624.59 E 562577.90 E 562549.02 E 562548.96 E 562531.18 E Vertical Section Comment 3356.57 3443.65 3530.72 3617.80 3704.88 0.000 3791.96 0.000 3879.03 0.000 3966.11 0.000 4053.19 0.000 4140.27 0.000 4227.34 0.000 4314.42 0.000 4401.50 0.000 4488.58 0.000 4575.65 0.000 4662.73 0.000 4749.81 0.000 4836.89 0.000 4923.96 0.000 5011.04 0.000 5098.12 0.000 5185.20 0.000 5272.28 0.000 5359.35 0.000 5446.43 0.000 5533.51 0.000 5620.59 0.000 5674.45 0.000 5674.55 4.000 5707.83 BPXA Milne Point MPS ~i ,-," DrlllQuest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MPS-29 Revised: 10 September, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azlm. Depth Depth Northings Eastlngs Comment (ft) (ft) (ft) (ft) (ft) 8200.00 76.167 331.493 4049.12 4115.82 5477.61 N 3138.90 W 60053 5796.86 8300.00 80.144 331.940 4069.64 4136.34 5563.78 N 3185.26 W 60054 5887.71 8400.00 84.121 332.375 4083.33 4150.03 5651.36 N 3231.51 W;.~,+(:6905558.9 5979.95 8489.48 87.680 332.760 4089.72 4156.42 5730.56 N 3272.62 W ~ Gp05637. 6063.28 ~} 8500.00 87.680 332.760 4090.15 4156.85 5739.90 N 327> W--, 6005647.12 N 6073.11 8600.00 87.680 332.760 4094.20 5828.74 N 005735.56 N 562296.84 E 0.000 6166.54 8700.00 87.680 332.760 4098.24 5917.58 N 6005823.99 N 562250.32 E 0.000 6259.97 8708.48 87.680 332.760 4098.59 5..11 N 6005831.49 N 562246.38 E 0.000 6267.90 8800.00 87.694 336.423 4102.28 6001:070 N 6005913.72 N 562206.43 E 3.999 6354.38 8900.00 87.719 340.425 4106.29 ~1ciÓ.60 N 6006006.30 N 562168.87 E 3.999 6450.84 9000.00 87.756 344.428 3478.91 W 6006101.27 N 562137.87 E 3.999 6548.87 9100.00 87.803 348.430 3502.35 W 6006198.17 N 562113.58 E 3.999 6648.01 KOP : Start Dir @ 12.oo00/100ft: 9100.00ftMD,4180.81 ftTVD 6312.58 N 3506.16 W 6006217.77 N 562109.60 E 12.000 6667.94 6351.90 N 3513.24 W 6006257.03 N 562102.17 E 12.000 6707.82 End Dir, Start Sail @ 94.672° : 9160.00ftMD,4179.63ftTVD 4112.89 4179.59 6352.37 N 3513.33 W 6006257.49 N 562102.08 E 12.000 6708.29 4109.63 4176.33 6391.16 N 3520.20 W 600629622 N 562094.87 E 0.000 6747.60 4107.78 4174.48 6413.22 N 3524.11 W 6006318.25 N 562090.76 E 0.000 6769.97 Begin Dir @ 9.0000/10Oft: 9222.4Qft MD,4174.48ftTVD ~J 94.428 356.940 4101.58 4168.28 6489.93 N 3532.93 W 6006394.88 N 562081.21 E 9.000 6847.19 94.000 5.000 4095.00 4161.70 6579.04 N 3531.42 W 6006484.00 N 562082.00 E 9.000 6935.56 Target - MPS-29L 1 T1 93.904 5.946 4094.27 4160.97 6589.53 N 3530.41 W 6006494.50 N 562082.91 E 8.986 6945.86 92.942 14.897 4088.29 4154.99 6687.60 N 3512.37 W 6006592.72 N 562100.09 E 8.986 7041.27 91 .909 23.832 4084.05 4150.75 6781.76 N 3479.28 W 6006687.17 N 562132.36 E 8.986 7131.10 9700.00 90.830 32.755 4081.65 4148.35 6869.70 N 3431.94 W 6006775.52 N 562178.92 E 8.986 7213.13 9800.00 89.730 41.674 4081.16 4147.86 6949.26 N 3371.52 W 6006855.60 N 562238.64 E 8.986 7285.36 9900.00 88.638 50.595 4082.59 414929 7018.48 N 3299.50 W 6006925.45 N 562310.04 E 8.986 7346.01 9955.85 88.040 55.580 4084.21 4150.91 7051.99 N 3254.88 W 6006959.36 N 562354.37 E 8.986 7374.28 End Dir, Start Sail @ 88.040° : 9955.85ftMD,4150.91 ftTVD 10000.00 88.040 55.580 4085.72 4152.42 7076.94 N 3218.48 W 6006984.62 N 562390.55 E 0.000 7394.95 10 September, 2002 - 16:15 Page50f9 DrR/Quest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MPS.29 Revised: 10 September, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth Comment (ft) (ft) (ft) 10087.45 88.040 55.580 4088.71 4155.41 7126.34 N 7435.90 Begin Dir @ 4.0000/100ft: 10087.4511 MD, 4155.41ftTVD 10100.00 87.602 55.336 4089.19 4155.89 7133.45 N 3.999 7441.80 10117.22 87.000 55.000 4090.00 4156.70 7143.27 N 3.999 7449.97 Target - MPS-29L 1 T2 ~,ì 10148.24 85.971 54.305 4091.90 4158.60 7161.18 N 4.000 7464.91 End Dir, Start Sail @ 85.971 ° : 1 0148.24ftMD ,4158.60ftTVD 10200.00 85.971 54.305 4095.54 4162.24 562553.26 E 0.000 7490.12 10300.00 85.971 54.305 4102.56 562633.76 E 0.000 7538.81 10400.00 85.971 54.305 4109.59 562714.26 E 0.000 7587.49 10500.00 85.971 54.305 4116.61 562794.76 E 0.000 7636.18 10559.77 85.971 54.305 4120.81 562842.87 E 0.000 7665.28 Begin Dir @ 4.0000/100ft: 10559.7711 MD, 4187.51ftTVD 10600.00 86.357 52.739 2731.02 W 6007336.53 N 562874.93 E 4.000 7685.35 10700.00 87.326 7487.67 N 2653.66 W 6007400.31 N 562951.73 E 4.000 7739.32 10721.94 87.540 7502.22 N 2637.27 W 6007415.00 N 562968.00 E 4.000 7751.92 Target - MPS-29L 1 T3 10754.16 87.537 7524.02 N 2613.59 W 6007437.01 N 562991.48 E 4.000 7770.91 End Dir, Start Sail @ 87.537° : 1 0754.16ftMD,4198.08ftTVD 4200.05 7555.43 N 2580.25 W 6007468.71 N 563024.54 E 0.000 7798.36 4204.35 7623.93 N 2507.53 W 6007537.85 N 563096.66 E 0.000 7858.22 4141.95 4208.65 7692.44 N 2434.81 W 6007606.99 N 563168.78 E 0.000 7918.08 4146.25 4212.95 7760.94 N 2362.09 W 6007676.14 N 563240.89 E 0.000 7977.94 4150.55 4217.25 7829.45 N 2289.37 W 6007745.28 N 563313.01 E 0.000 8037.80 4153.27 4219.97 7872.86 N 2243.28 W 6007789.09 N 563358.71 E 0.000 8075.73 ~/l 4154.73 4221 .43 7898.29 N 2216.95 W 6007814.75 N 563384.81 E 4.000 8098.02 11307.38 87.960 45.000 4155.00 4221. 70 7903.49 N 2211.72 W 6007820.00 N 563390.00 E 4.000 8102.61 Begin Dir @ 4.0000/100ft: 11307.3811 MD, 4221.70ftTVD Target - MPS-29L 1 T4 11321.21 87.961 44.447 4155.49 4222.19 7913.31 N 2202.00 W 6007829.90 N 563399.64 E 4.000 8111.26 End Dir, Start Sail @ 87.961° : 11321.21 ftMD,4222.19ftTVD 11400.00 87.961 44.447 4158.30 4225.00 7969.52 N 2146.86 W 6007886.60 N 563454.28 E 0.000 8160.89 11500.00 87.961 44.447 4161.85 4228.55 8040.87 N 2076.88 W 6007958.55 N 563523.63 E 0.000 8223.89 11600.00 87.961 44.447 4165.41 4232.11 8112.21 N 2006.90 W 6008030.51 N 563592.98 E 0.000 8286.88 10 September, 2002. 16:15 Page6of9 DrH/Quest 2.00.09.008 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azlm. Depth Depth (It) (It) (It) 11700.00 87.961 44.447 4168.97 4235.67 11800.00 87.961 44.447 4172.53 4239.23 11900.00 87.961 44.447 4176.08 4242.78 11905.85 87.961 44.447 4176.29 4242.99 12000.00 88.423 40.707 4179.26 4245.96 12028.02 88.562 39.595 4180.00 4246.70 12100.00 88.562 39.595 12200.00 88.562 39.595 12300.00 88.562 39.595 12400.00 88.562 39.595 12500.00 12600.00 12700.00 12800.00 12900.00 4271.09 4271.70 Sperry-Sun Drilling Services Proposal Report for MPS-29 Revised: 10 September, 2002 BPXA Milne Point MPS AGT.ftt\~~~;'h~ Global Coordlnat~ "'~{\ Døgle 'f1,. No~~:ngs '~'~...l;.f~\~tç'Jr';:'~ Á~~' ~.' 1936.92 W 6008102AtÑ; é2~'t 0.000 8349.87 1866.94 W 6008174A3.N:~:.i"" iJrM E 0.000 8412.86 1796.96 W .08246.39 N '~' 5 801.03 E 0.000 8475.85 1792.ßr 8250. 563805.09 E 0.000 8479.54 Begin Dir @ 4.0000/100ft: 1190f . ,,1~ ~\W'~¡'6008320'43 N 563868,13 E 4,000 8541.19 MD,4242,99ftTVD -" .' ' 6008342.00 N 563886.00 E 4.000 8560.43 End Dir, Start Sail @ 88.562° : 12028.02ftMD ,4246. 70ftTVD Target - MPS-29L 1 T5 Local Coordinates Northlngs Eastlngs (It) (It) ~ 1665.29 W 6008397.85 N 563931.37 E 1601.57 W 6008475.44 N 563994.41 E 1537.86 W 6008553.03 N 564057.45 E 1474.14 W 6008630.62 N 564120.48 E 8784.69 N 1410.43 W 600870821 N 564183.52 E 8861.72 N 1346.71 W 6008785.80 N 564246.55 E 8938.76 N 1283.00 W 6008863.39 N 564309.59 E 9015.79 N 1219.28 W 6008940.98 N 564372.62 E 9092.82 N 1155.57 W 6009018.57 N 564435.66 E 9169.86 N 1091.85 W 6009096.16 N 564498.69 E 9188.56 N 1076.38 W 6009115.00 N 564514.00 E The Dogleg Severity Is In Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 353.520° (True). 8183.56 N 8254.90 N 8326.25 N 8330.42 N 8399.70 N 8421.11 N Based upon Minimum Curvature type calculations, at a Measured Depth of 13024.28ft., The Bottom Hole Displacement is 9251.3911., in the Direction of 353.319° (True). Comment 0.000 8610.35 0.000 8679.70 0.000 8749.05 0.000 8818.40 0.000 8887.74 0.000 8957.09 0.000 9026.44 0.000 9095.79 0.000 9165.14 0.000 9234.49 0.000 9251.33 Total Depth: 13024.28ftMD,4271.70ftTVD Target - MPS-29L 1 T6 ì . ~ , J ~, All data is in t (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. 10 September, 2002 -16:15 Page 70f9 Drll/Quest 2.00.09.008 Sperry-Sun Drilling Services Proposal Report for MPS-29 Revised: 10 September, 2002 Station Coordinates TVD Northlngs Eastings (ft) (ft) (ft) BPXA Milne Point MPS BP EXPLORATION (ALASKA) INC. Milne Point Unit Comments Measured Depth (ft) 9100.00 9160.00 9222.49 9955.85 10087.45 10148.24 10559.77 10754.16 11307.38 11321.21 11905.85 12028.02 13024.28 Comment 4180.81 4179.63 4174.48 4150.91 4155.41 6292.95 N 6351.90 N 6413.23 N 7051.99 N 7126.34 N 3502.35 W 3513.24 W 3524.11 W 3254.88 W 3146.39 W KOP : Start Dir @ 'Ij. 9100. ,4180.81ftTVD End Dir, Start Sail.9 60.00ftMD,4179.63ftTVD Begin Dir @(19J>0~ .,.. .49ft MD, 4174.48ftTVD End Dir.iatart!$ä1ì\;@~f6a.04' rt~ 9955.85ftMD,4150.91 ftTVD Begin Ò)~:'. . 'trtttbPft : 1"Ó087.45ft MD, 4155.41 ft TVD . ;. - "-\~ÿ~~'! :: ......,p' , 4158.60 4187.51 4198.08 4221.70 4222.19 d Dir, Start, @ 85.971° : 10148.24ftMD,4158.60ftTVD in Dir @ 4.0000/100ft: 10559.77ft MD, 4187.51ft TVD ir, Start Sail @ 87.537° : 1 0754.16ftMD ,4198.08ftTVD Be Dir @ 4.0000/100ft: 11307.38ft MD, 4221.70ft TVD End Dir, Start Sail @ 87.961° : 11321.21ftMD,4222.19ftTVD Begin Dir @ 4.0000/100ft : 11905.85ft MD, 4242.99ft TVD End Dir, Start Sail @ 88.562° : 12028.02ftMD,4246.70ftTVD Total Depth: 13024.28ftMD,4271.70ftlVD Target Entry Coordinates TVD Northings Eastings Target Target (ft) (ft) (ft) Shape Type 4161.70 6579.04 N 3531.42 W Point MPS-29L 1 T2 4156.70 7143.27 N 3121.94 W Point MPS-29L 1 T3 4196.70 7502.22 N 2637.27 W Point MPS-29L1 T4 4221.70 7903.49 N 2211.72 W Point 10 September, 2002 -16:15 Page8of9 DrHlOuest 2.00.09.008 ~ '. Sperry-Sun Drilling Services Proposal Report for MPS.29 Revised: 10 September, 2002 BPXA Milne Point MPS BP EXPLORATION (ALASKA) INC. Milne Point Unit ,.,,: '-, .t. ~::: : ' , ,~ Target Ent~y ë"õordh"", ~~~ ij:r~,s:~~>'~ -,' Target Target Shape Type Target Name .( Targets associated with this wellpath (Continued) :,. (-. 1711.15 W Point MPS-29L 1 T5 ~~ 9188.56 N 1076.38 W Point MPS-29L 1 T6 --! f Drll/Quest 2.00.09.008 Page90f9 10 September, 2002. 16:15 ') ) Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit to Drill sub section 14 (e) if a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface or production casing, the applicant shall designate one branch as the primary Well bore and include all information required under (c) of this section that is unique to that branch and need not include the $100 fee. Rev: 07110/02 C\j ody\templates ') ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELLNAME/1¡O?t /l1,PS--29¿ I 2-02- /7 h CHECK WHAT APPLIES v PTD# ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT (PH) HOLE SPACING EXCEPTION DRY DITCH SAMPLE "CLUE" The permit is for a new wellbore segment of existing well /I1,;'JCt /I? /05 - ¿ 9 Permit No,2o<. -/f.5API No. ~ -òz9- 2-3//? Production should continue to be reported as a function' of the original API number stated above. In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing , exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater tban 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANy;1j7.;;¿ WELL NAME,Af~ -¿r ¿/ PROGRAM: Exp- Dev - Redrll- Re-Enter - Serv - Wellbore seg:2L FIELD & POOL.)" 2..ç' / Cjr j INIT CLASS ge ~ - /-¿>IJ j - GEOL AREA ¡: l'd UNIT# ;II.?.:> !? ON/OFF SHORE ~ ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . ry' N 2. Lease number appropriate. .. . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N N..? o.J. ~ /¡? 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N 4If--- ~<- 9. Operator only affected party.. . . . . . . . . . . . .. . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 1 Z. Permit can be issued without administrative approval.. . . . . \Y) N {Service Well Only} 13. Well located w/in area & strata authon.'zed by injection order#~&Y.. . /I/,,q \ (Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. Y. N ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . --' N 16. Surface casing protects all known USDWs. . . . . . . . . . . . N 17. CMT vol ádequate to circulate on conductor & surf csg. . . . . ~ 18. CMT vol adequate to tie-in long string to surf csg. . . . .. . . -¥--N- ..J' 19. CMT will cover all known productive horizons, . . . . , , " , ~. N- <;!,<J[f'.U ~~: ~~:~~a~::~~~~;~~~~:~~~~ ~it:: ~ ~ :~r~~fr~~t.. : :: : : : '. ~ ;) ~(;-r- /4/ 22. If a re-drill, has a 10-403 for abandonment been approved. . . "A. N AI/H-. 23. Adequate wellbore separation proposed.. . . . . . . . . . . . æ N 24. If diverter required, does it meet regulations. . . . . . . . . . '-¥::-N- "'lit- 25. Drilling fluid program schematic & equip list adequate. . . . . f. N YlÆ. cv¡¿ 111~ ( 4 ('l fl... r c¡ 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N (pCJ APPR DATE 27. BOPE press rating appropriate; test to L/ (JOe:) psig. N rn S I> I } L P ç ;. '¡' A ,1 I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N W~T Q/{..5{OL 29. Work will occur without operation shutdown. . . . . . . . . . . N 30. Is presence of H2S gas probable... . . . . . . . . . . . . . . Y @ 31. Mechanical condition of wells within AOR verified. . . . . . . . ~ AlIA- ~ n jUrA. /' (Service Well Only) GEOLOGY APPR DATE ,d~ . rE~ploratory Only} 32. Permit can be issued wlo hydrogen sulfide measures. . . . . 33. Data presented on potential overpressure zones. . . . . . . . 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . 36. Contact name/phone for weekly progress reports. . . . . . . . GEOLOGY: RP&G- PETROLEUM ENGINEERING: TEM RESERVOIR ENGINEERING JDH UIC ENGINEER JBR COMMISSIONER: COT CtJT DTS Comments/Instructions: SFD WGAV4A-- MJW Rev: 07/12/02 G:\geology\permits\checklist.doc ) ') Well Histor.y File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process' but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically. . organize this category of information. ) ) aOd- /90 //3~1 Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Dec 09 15:00:53 2002 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/12/09 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... .......... ...UNKNOWN Continuation Number... ...01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/12/09 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name......... ...... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments........... ..... .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-29 L1 500292311960 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 09-DEC-02 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22160 B. ZIEMKE C. DIXON MWDRUN 2 AK-MW-22160 B. HENNINGSE C. DIXON MWDRUN 3 AK-MW-22160 B. HENNINGSE C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 5 AK-MW-22160 J. STRAHAN E. VAUGHN MWDRUN 6 AK-MW-22160 J. STRAHAN E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3270 340 MSL 0) 66.60 39.10 1 ' ) # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 108.0 6.125 7.625 8842.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1, 2, 3, AND 6 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). RUN 6 ALSO INCLUDED AT-BIT-INCLINATION (ABI). THE PURPOSE OF RUN 5, COMPRISING DIRECTIONAL AND DGR, WAS TO SET THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE WHIPSTOCK WAS SET AT 8842' MD IN THE MPS-29 WELL BORE. ONLY ROP DATA FOR RUN 5 ARE PRESENTED. 4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 10/16/02. MWD DATA ARE CONSIDERED PDC. 5. MWD RUNS 1, 2, 3 (PART), AND 6 REPRESENT WELL MPS-29L1 WITH API#: 50-029-23119-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12950'MD/ 4274'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record..65535 File Type...... ......,. ..LO Previous File Name.. .....STSLIB.OOO Comment Record FILE HEADER ) FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR ROP $ 1 clipped curves; all bit runs merged. .5000 START DEPTH 64.0 64.0 64.0 64.0 64.0 71.5 109.0 STOP DEPTH 12903.0 12903.0 12903.0 12903.0 12903.0 12896.0 12950.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 64.0 3213.5 MWD 2 3213.5 7508.5 MWD 3 7508.5 8842.0 MWD 5 8842.0 8869.0 MWD 6 8869.0 12950.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type...... ..... ... ....0 Data Specification Block Type.....O Logging Direction. ...... ...... ....Down Optical log depth units.... ... ... .Feet Data Reference Point....... ...... . Undefined Frame Spacing......... ...... ..... .60 .1IN Max frames per record. ...... ......Undefined Absent value............ ........ ..-999 Depth units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 64 12950 6507 25773 64 12950 ROP MWD FT/H 1.14 1890 335.736 25683 109 12950 GR MWD API 4.48 119.29 69.1717 25650 71.5 12896 RPX MWD OHMM 0.1 2000 119.642 25679 64 12903 RPS MWD OHMM 0.07 2000 93.663 25679 64 12903 ) ) RPM MWD OHMM 0.07 2000 88.2953 25679 64 12903 RPD MWD OHMM 0.07 2000 148.504 25679 64 12903 FET MWD HOUR 0.02 167.74 0.518961 25679 64 12903 First Reading For Entire File......... .64 Last Reading For Entire File..... ..... .12950 File Trailer Service name... ... ...... .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.... ...02/12/09 Maximum Physical Record. .65535 File Type.. ........ ..... .LO Next File Name..... ..... .STSLIB.002 Physical EOF File Header Service name.... ...... ...STSLIB.002 Service Sub Level Name... Version Number..... ..... .1.0.0 Date of Generation. ..... .02/12/09 Maximum Physical Record..65535 File Type... .... ...... ...LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPS RPX RPM RPD FET GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 64.0 64.0 64.0 64.0 64.0 71.5 109.0 STOP DEPTH 3169.5 3169.5 3169.5 3169.5 3169.5 3177.0 3213.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 01-0CT-02 Insite 66.37 Memory 3213.0 108.0 3213.0 2.1 73.1 # TOOL STRING (TOP TO BOTTOM) ) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type...... ....... .....0 Data Specification Block Type. ....0 Logging Direction....... ..... ... ..Down Optical log depth units...... ... ..Feet Data Reference Point. ..... ... ... ..Undefined Frame Spacing.. ...... ......... ... .60 .1IN Max frames per record.. .... ...... . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) TOOL NUMBER 66093 103792 9.875 108.0 LSND 9.10 102.0 7.5 600 11.4 7.800 8.220 8.000 5.700 72.0 68.0 72.0 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 64 3213.5 1638.75 6300 64 3213.5 ROP MWD010 FT/H 17.43 1798.06 300.231 6210 109 3213.5 GR MWD010 API 16.08 118.58 61.2295 6212 71.5 3177 RPX MWD010 OHMM 0.1 2000 427.578 6212 64 3169.5 RPS MWD010 OHMM 0.07 2000 318.097 6212 64 3169.5 RPM MWD010 OHMM 0.07 2000 291.288 6212 64 3169.5 ) ) RPD MWD010 OHMM 0.07 2000 542.34 6212 64 3169.5 FET MWD010 HOUR 0.02 2.36 0.332265 6212 64 3169.5 First Reading For Entire File.. ....... .64 Last Reading For Entire File.......... .3213.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 F i 1 e Type... . . . . . . . . . . . . . LO Next File Name...... .... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number. ......... .1.0.0 Date of Generation..... ..02/12/09 Maximum Physical Record..65535 File Type................LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPX FET RPD RPM RPS GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3170.0 3170.0 3170.0 3170.0 3170.0 3177.5 3214.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE STOP DEPTH 7464.0 7464.0 7464.0 7464.0 7464.0 7472.0 7508.5 03-0CT-02 Insite 66.37 Memory 7508.0 3213.0 7508.0 67.2 74.2 TOOL NUMBER ) ) DGR DUAL GAMMA RAY 66093 EWR4 ELECTROMAG. RESIS. 4 103792 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 108.0 # BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.20 MUD VISCOSITY ( S) : 134.0 MUD PH: 7.0 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3): 9.4 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 8.000 75.0 MUD AT MAX CIRCULATING TERMPERATURE: 7.910 75.9 MUD FILTRATE AT MT: 8.000 75.0 MUD CAKE AT MT: 6.000 75.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ............ ..0 Data Specification Block Type.. ...0 Logging Direction........... ... ...Down Optical log depth units..... .... ..Feet Data Reference Point... ......... ..Undefined Frame Spacing. ...... ..... ..... ... .60 .1IN Max frames per record.......... ...Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3170 7508.5 5339.25 8678 3170 7508.5 ROP MWD020 FT/H 11.03 1890 488.312 8590 3214 7508.5 GR MWD020 API 4.48 114.74 65.5595 8590 3177.5 7472 RPX MWD020 OHMM 4.52 273.27 15.9172 8589 3170 7464 RPS MWD020 OHMM 3.79 412.97 16.2883 8589 3170 7464 RPM MWD020 OHMM 1.14 1390.59 16.6864 8589 3170 7464 RPD MWD020 OHMM 1.69 1445.87 17.9489 8589 3170 7464 ) FET MWD020 HOUR 0.05 ) 8.06 0.41744 8589 First Reading For Entire File......... .3170 Last Reading For Entire File.... ..... ..7508.5 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type............... .LO Next File Name......... ..STSLIB.004 Physical EOF File Header Service name. ...... ..... .STSLIB.004 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type... ... ......... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPX RPS RPM FET RPD GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 7464.5 7464.5 7464.5 7464.5 7464.5 7472.5 7509.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL ( FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY STOP DEPTH 8842.0 8842.0 8842.0 8842.0 8842.0 8842.0 8842.0 04-0CT-02 Insite 66.37 Memory 8842.0 7508.0 8842.0 67.6 88.7 TOOL NUMBER 66093 3170 7464 ) ) EWR4 ELECTROMAG. RES IS. 4 103792 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE ( IN): 9.875 DRILLER'S CASING DEPTH (FT): 108.0 # BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 111.0 MUD PH: 7.0 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3): 8.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 3.500 75.0 MUD AT MAX CIRCULATING TERMPERATURE: 2.580 104.0 MUD FILTRATE AT MT: 7.000 75.0 MUD CAKE AT MT: 3.300 75.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type...... .... ... .....0 Data Specification Block Type.....O Logging Direction.............. ...Down Optical log depth units......... ..Feet Data Reference Point...... ...... ..Undefined Frame' Spacing. . . . . . . . . . . . . . . . . . . . .60 .1IN Max frames per record...... ...... .Undefined Absent value.............. ..... ...-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7464.5 8842 8153.25 2756 7464.5 8842 ROP MWD030 FT/H 12.9 819.68 217.916 2667 7509 8842 GR MWD030 API 29.51 110.78 74.3909 2740 7472.5 8842 RPX MWD030 OHMM 4.84 567.44 17.8896 2756 7464.5 8842 RPS MWD030 OHMM 4.94 114.05 17.8984 2756 7464.5 8842 RPM MWD030 OHMM 5.05 82.22 18.6273 2756 7464.5 8842 RPD MWD030 OHMM 5.23 77.7 19.5625 2756 7464.5 8842 FET MWD030 HOUR 0.07 17.4 0.963037 2756 7464.5 8842 ) ) First Reading For Entire File.... ......7464.5 Last Reading For Entire File.......... .8842 File Trailer Service name..... ..... ...STSLIB.004 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation.... ...02/12/09 Maximum Physical Record..65535 File Type................LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name. ......... ...STSLIB.005 Service Sub Level Name... Version Number.. ... .... ..1.0.0 Date of Generation... ... .02/12/09 Maximum Physical Record..65535 File Type................LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 8842.5 $ 5 header data for each bit run in separate files. 5 .5000 STOP DEPTH 8869.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 11-0CT-02 Insite 66.37 Memory 8869.0 8842.0 8869.0 87.6 92.0 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 TOOL NUMBER 91360 162742 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 8842.0 # ) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction...... ..... ..... . Down Optical log depth units. ......... .Feet Data Reference Point.... ......... . Undefined Frame Spacing..................... 60 .1IN Max frames per record........... ..Undefined Absent value..... ...... ...... ... ..-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Flo-Pro 9.00 52.0 8.0 16400 5.0 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 Name Service Unit DEPT FT ROP MWD050 FT/H Min 8842.5 2.22 Max 8869 94.15 First Reading For Entire File....... ...8842.5 Last Reading For Entire File.... ..... ..8869 File Trailer Service name... ......... .STSLIB.005 Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record. .65535 File Type........ ....... .LO Next File Name..... ..... .STSLIB.006 Physical EOF Mean Nsam 8855.75 54 10.8417 54 ) .0 81.2 .0 .0 First Reading 8842.5 8842.5 Last Reading 8869 8869 ) File Header Service name...... ..... ..STSLIB.006 Service Sub Level Name. . . Version Number..... ..... .1.0.0 Date of Generation...... .02/12/09 Maximum Physical Record..65535 File Type............... .LO Previous File Name..... ..STSLIB.OO5 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 ) header data for each bit run in separate files. 6 .5000 START DEPTH 8842.5 8842.5 8842.5 8842.5 8842.5 8842.5 8869.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 12903.0 12903.0 12903.0 12903.0 12896.0 12903.0 12950.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # 13-0CT-02 Insite 66.37 Memory 12950.0 8869.0 12950.0 85.0 94.8 TOOL NUMBER 91360 162742 6.125 8842.0 Flo-Pro 9.15 50.0 8.0 18000 4.9 .210 .170 .190 .270 77.0 96.6 70.0 72.0 ) ) NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.. ................0 Data Specification Block Type.....O Logging Direction....... ......... . Down Optical log depth units. ... ..... ..Feet Data Reference Point............. . Undefined Frame Spacing..................... 60 .1IN Max frames per record... ......... . Undefined Absen t value. . . . . . . . . . . . . . . . . . . . . . - 9 9 9 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8842.5 12950 10896.3 8216 8842.5 12950 ROP MWD060 FT/H 1.14 745.73 242.822 8162 8869.5 12950 GR MWD060 API 43.56 119.29 77.3197 8108 8842.5 12896 RPX MWD060 OHMM 0.29 2000 28.3379 8122 8842.5 12903 RPS MWD060 OHMM 0.48 2000 29.5398 8122 8842.5 12903 RPM MWD060 OHMM 0.11 2000 32.4058 8122 8842.5 12903 RPD MWD060 OHMM 0.11 2000 29.0986 8122 8842.5 12903 FET MWD060 HOUR 0.12 167.74 0.618424 8122 8842.5 12903 First Reading For Entire File. ..... ....8842.5 Last Reading For Entire File.......... .12950 File Trailer Service name.... ........ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation. ... ...02/12/09 Maximum Physical Record. .65535 File Type....... ........ .LO Next File Name......... ..STSLIB.007 Physical EOF Tape Trailer ) Service name....... .... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/12/09 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.... ........... . UNKNOWN Continuation Number.... ..01 Next Tape Name... ...... ..UNKNOWN Comments.. ........ ...... .STS LIS Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/12/09 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name.... .......... ..UNKNOWN Continuation Number.... ..01 Next Reel Name..... ..... . UNKNOWN Comments................ .STS LIS Physical EOF physical EOF End Of LIS File ) Writing Library. Scientific Technical Services Writing Library. Scientific Technical Services