Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-196
.
.
..;,<.;Y
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
l' f AU" . A... fi ¡;,.~
. 10 1\ ê '1/ ,(V ~ tJ t
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
Well Name/No. MILNE PT UNIT SB S-29L 1
Operator BP EXPLORATION (ALASKA) INC
Permit to Drill 2021960
API No. 50-029-23119-60-00
ND 4274:/
Completion Date 1 0/16/2002 ,...-~
Completion Status 1-01L
Current Status 1-01L
UIC N
MD 12950
REQUIRED INFORMATION
Directional Survey ~)~.
Samples No
Mud Log No
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, GYRO, ABI/IFRlCASANDRA
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset Log Log Run
Type Med/Frmt Number Name Scale Media No
Rpt CDirectional Survey 1
Rpt ~387 "Æfirectlonal Survey 1
ED D LIS Verification 1
ED D £..Qirectional Survey 1
ED D Lßectional Survey 1
. /'
~
Interval
Start Stop
8792 12950
8792 12950
71 12896
8792 12950
8792 12950
OH/
CH Received Comments
Open 11/1/2002 MWD
Open 11/1/2002
Case 12/13/2002
Open 11/1/2002 MWD
Open 11/1/2002
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 9/30/2002.
&-(IS Verification
~t
71 12896 Case 12/13/2002
1,2,3,5, 64 12950 Open 6/2/2003
25 3,5,6 108 12950 Open 6/2/2003 MWD - ROP, DGR, EWR -
MD
25 3,5,6 108 4274 Open 6/2/2003 MWD - DGR, EWR - ND
Sample
Set
Sent Received Number Comments
ED C Asc ~ 1963 LIS Verification
ED C Pdf a.f11963 Induction/Resistivity
ED C Pdf ¿11963 Induction/Resistivity
~
Well Cores/Samples Information:
Interval
Start Stop
Name
Permit to Drill 2021960
MD 12950 ND 4274
ADDITIONAL INFORMATION
Well Cored? y~
Chips Received? '--r7~
Analysis -V'-,N---
Received?
Comments:
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
Well Name/No. MILNE PT UNIT SB S-29L1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23119-60-00
Completion Date 10/16/2002
Completion Status 1-01L
Daily History Received?
Formation Tops
~
Current Status 1-01L
(f)N
cDN
Date:
UIC N
.~
¡'~~ \~~~ I
~<
)
)
0CìVJ-/9&
a )CX
# /'/9W3
WELL LOG TRANSMITIAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January 16, 2003
RE: MWDFormation Evaluation Logs: MPS-29 Ll,
AK-MW-22160
MPS-29 Ll:
Digital Log Images:
50-029-23119-60
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNJNG THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E, Benson Blvd,
Anchorage, Alaska 99508
RECEIVED
Date~UN 0 2 2003
Alaska OH & Gas Cons. CommiJeion
Anchorøge
d--D ;;;( - I 'iL.o
Signed~~. JV"\~~~
'-~ ~"\~ í'v\ ~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 01/05/03, Start Production
)
')
23.
CASING
SIZE
20"
7-5/8"
1. Status of Well
aD Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
3462' NSL, 3493' WEL, SEC. 01, T12N, R10E, UM {OA}
At total depth
1792' NSL, 14281 WEL, SEC. 35, T13N, R10E, UM {OA}
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE= 66.6' ADL 025518
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
10-10-2002 10-13-2002 10-16-2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12950 4274 FT 12950 4274 FT aD Yes aD No
22. Type Electric or Other Logs Run
MWD , GR , RES, GYRO, ABI/IFR 1 CASANDRA
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
28' 112' 42"
28' 8842' 9-7/8"
Classification of Service Well
~-
.',
~~~l ..; .,:.)
!:!_~1
7. Permit Number
202-196
8. API Number
50-029-23119-60
9. Unit or Lease Name
Milne Point Unit
10. Well Number
M PS-29L 1
11. Field and Pool
Milne Point Unit I Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' {Approx.}
WT. PER FT.
92#
29.7#
GRADE
H-40
L-80
4-1/2"
12.7#
L-80
8820'
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1868 sx PF IL', 600 sx Class 'G'
(Top Job 49 sx PF 'L' )
6-1/8" Uncemented Slotted Liner
AMOUNT PULLED
12911'
. 24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
25.
SIZE
4-1/2", 12.6#, L-80
TUBING RECORD
DEPTH SET (MD)
8174'
PACKER SET (MD)
8123'
MD
TVD
MD
TVD
9344' - 12867' 4150' - 4273'
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 82 Bbls of Diesel
27.
Date First Production
December 11, 2002
Date of Test Hours Tested
12/18/2002 6
Flow Tubing Casing Pressure
Press.
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL -BBL
TEST PERIOD 1321
OIL-BBL
CALCULATED
24-HoUR RATE
GAs-McF
931
GAs-McF
WATER-BBL
0
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
705
OIL GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wat~ 1:bCitlVtD
No core samples were taken.
28.
,JJ\N 0 6 2003
i~aska au & Gas Cons. Commission
Form 10-407 Rev. 07-01-80
RBDMS BFl
6F-
0 '100
,,/ tt .3
Submit In Duplicate
, ,
)
')
29.
Marker Name
Geologic Markers
Measured
Depth
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
BF1-NB
7863'
4013'
SBF1-NBR
7877'
4018'
SBF12
7921'
4034'
SBE4-NC
7944'
4043'
SBE41
7961'
4049'
SBE2-NE
7978'
4055'
SBE1-NF
8115'
41051
Top of Schradder OA Sand
82021
4131'
Top of Schradder OA Sand
12873'
4273'
RECEIVE
JAN 06 2003
Commission
31. List of Attachments:
Post Rig Work Summary Report.
32. I hereby certify that the foregoing is
Signed
Title Technical Assistant
Date 0 l - OS --03
MPS-29L 1
Well Number
202-196
Permit No. I Approval No.
Prepared By Name/Number: Sondra Stewman, 564-4750
Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
)
)
MPS-29 & MPS-29L 1
Milne Point Unit I Schrader Bluff Field
50-029-23119-00 & 50-029-23119-60
202-195 & 202-196
Rig Accept: 09/29/02
Rig Spud: 09/30102
Rig Release: 10/16/02
141
POST RIG WORK
11/13/02
RIH VERY SLOW, PULLED BALL & ROD @ 8145'WLM. PLAN TO ASSEMBLE EXTRA LUBRICATOR
SECTION & EXTRA WEIGHT BAR TO RETRIEVE RHC IN AM.
11/14/02
USED PUMP TRUCK TO ASSIST IN WIRELlNE OPERATIONS, AS SHOWN ABOVE. PULLED RHC
@ 8169'. PULLED RP SHEAR VALVE @ 2214', AND REPLACED WI DGLV. SHIFTED SSD INTO
OPEN POSITION, AND SET JET PUMP WI 138 RATIO, #13 NOZZLE, AND #14 THROAT (SER#BP-
1071). FREEZE PROTECTED IA WI 52 BBLS DIESEL.
')
)
ao~- f9k,
/ / 3~1
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
December 12, 2002
RE: MWD Formation Evaluation Logs MPS-29 Ll,
AK-MW-22160
1 LIS formatted Disc with verification listing.
API#: 50-029-23119-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~~
RECEIV'E,D
DEC 13 2Q02
Alaska Wi) & Gas Coos. CQmmj~n
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
)
)
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM".: ':
At top of productive interval ~ J()'::Yt. o¿
3462' NSL, 3493' WEL, SEC. 01, T12N, R10E, UM (OA) 1 ~;;::-':',:~':"" :
At total depth j V[~::.1 '. .,
1792' NSL, 1428' WEL, SEC. 35, T13N, R10E, UM (OA) t::Z=:.:.:.::J
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE= 66.6' ADL 025518
12. Date Spudde? 13. Date T.D. Rea~hed 14. Date Comp., Susp., or Aband.
10-10-2002 1 0-13-~002 10-16-2002 .
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12950 4274 FT 12950 4274 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD , GR , RES, GYRO, ABIIIFR I CASANDRA
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD
20" 92# H-40 28' 112' 42" ~60 sx Arctic Set (Approx.)
7-5/8" 29.7# L-80 28' 8842' 9-7/8" 1868 sx PF 'L', 600 sx Class 'G'
(Top Job 49 sx PF 'L' )
12911' 6-1/8" Uncemented Slotted Liner
Classification of Service Well
7. Permit Number
202-196
8. API Number
50-029-23119-60
9. Unit or Lease Name
Milne Point Unit
10. Well Number
MPS-29L 1
11. Field and Pool
Milne Point Unit I Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' {Approx.}
"'-/IcJI~ gg'l'Z" /n,b
ii7~I'7YD
AMOUNT PUllED
4-112"
12.7#
L-80
8820'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
SIZE
4-1/2", 12.6#, L-80
TUBING RECORD
DEPTH SET {MD}
8174'
PACKER SET (MD)
8123'
25.
MD
TVD
MD
TVD
9344' - 12867' 4150' - 4273'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 82 Bbls of Diesel
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
N/A
PRODUCTION FOR Oll-BBl
TEST PERIOD
GAs-McF
WATER-Bsl
CHOKE SIZE
GAS-Oil RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28, Brief description of lithology, porosity, fractures, apparentc;: ~';~resence of oil, gas or water. sUbmE:i (;ili.' V E D
Oil -BBl
GAs-McF
WATER-BSl
Oil GRAVITY-API (CORR)
No core samples were taken.
RBDMS BFL
.~,1~:11 r"
NOV 1 4 2002
Alaska Oil & Gas Gons. Commission
Anchorage
Form 10-407 Rev. 07-01-80
Submit In Duplicate
')
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
BF1-NB 7863' 4013'
SBF1-NBR 7877' 4018'
SBF12 7921' 4034'
SBE4-NC 7944' 4043'
SBE41 7961' 4049'
SBE2-NE 7978' 4055'
SBE1-NF 8115' 4105'
Top of Schradder OA Sand 8202' 4131'
Top of Schradder OA Sand 12873' 4273'
31. List of Attachments:
')
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
RE(EIVED
NOV 1 4 2002
AlasJ(a Oil & Gas Cons. CommiuioJ)
Anchorage
Summary of Daily Drilling Reports, Surveys and Leak-Off Test Summary
32. I hereby certify that the ~~?ing is true ~rrect to the best of my knowledge
Signed sondra~wman ~~ Title Technical Assistant Date '\ \-l~-ò'--
MPS-29L 1 202-196 Prepared By Name/Number: Sandra Stewman, 564-4750
Well Number Permit No. I Approval No. Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
Legal Name: MPS-29
Common Name: MPS-29
Test Date
10/8/2002
Test Tjpé
FIT
Test Depth (TMD)
9,278.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
4,192.0 (ft)
AMW
8.90 (ppg)
Surface Pressure
540 (psi)
Leak Off Pressure (BHP)
2,478 (psi)
Page 1 of 1
EMW
11.38 (ppg)
~
'~
Printed: 10/21/2002 8:49:21 AM
)
BP EXPLORATION
OperationSSurtll1'laryRepQr1
Page1of7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
9/29/2002 14:00 -19:30 5.50 MOB P PRE MOVE RIG FROM MPS-17, SPOT RIG OVER MPS-29
19:30 - 20:30 1.00 MOB P PRE SPOT ROCKWASHER, HOOK UP SERVICE LINES
20:30 - 00:00 3.50 MOB P PRE REPAIRING TOP DRIVE
9/30/2002 00:00 - 04:00 4.00 RIGU P PRE NIPPLE UP DIVERTER, TAKING ON WATER, MIXING SPUD
MUD, LOAD PIPE SHED
RIG ACCEPT @ 00:01 9/30/2002
04:00 - 05:00 1.00 RIGU P PRE CHANGE OUT TOP DRIVE SAVER SUB.
05:00 - 14:00 9.00 DRILL P INT1 PICKING UP DRILL PIPE AND STANDING IN DERRICK,
TOTAL OF 297 JTS. OF 4 IN, 17 JTS 5 HWP, 3 FLRX
COLLARS
14:00 -15:00 1.00 DRILL P INT1 SLIP AND CUT DRILLING LINE
15:00 - 15:30 0.50 DRILL P INT1 SPUD MEETING
15:30 - 17:00 1.50 DRILL P INT1 PICKUP BHA BIT ,7" MOTOR 1.5 BEND, STAB,MWD,HANG
OFF SUB,UBHO SUB,STAB, I STAND HWP
17:00 - 17:30 0.50 DRILL P INT1 FUNCTION TEST DIVERTER AND ACCUMULATOR
WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK
SCHEVE AOGCC
17:30 - 19:30 2.00 DRILL P INT1 SPUD WELL, DRILLING FROM 108 TO 270'
GOT GOOD MWD SURVEY @ 168 FT SURVEY DEPTH
19:30 - 20:30 1.00 DRILL P INT1 RIG UP SLICK LINE RUN GYRO @ 178' SURVEY DEPTH
20:30 - 00:00 3.50 DRILL P INT1 DRILLING FROM 270' TO 813' WITH 70 RPM, 20/25K BIT
WT. 360 GALS MIN. 900 PSI, TQ 3,000 ART 2, AST 1.5
KICKED OFF @ 270 FT.
10/1/2002 00:00 -16:30 16.50 DRILL P INT1 DRILLING FROM 813' TO 3213' - WOB 15K TO 20K - GPM
505 - PP ON 2520 - PP OFF 2400 - RPM 80 - TQ ON 5K - TO
OFF 3K - PU 78K - SO 62K - ROT 73K
16:30 -17:30 1.00 DRILL P INT1 CIRC CONDITION HOLE FOR TRIP - 80 RPM'S - 500 GPM -
PP 2400
17:30 - 20:00 2.50 DRILL P INT1 PUMP OUT OF HOLE @ 500 GPM TO 719'
20:00 - 22:00 2.00 DRILL P INT1 BHA - STAND BACK HWDP - FLEX DC'S - UD UBHO SUB -
BREAK OFF BIT - ADJUST MOTOR TO 1.22 DEGREE - M/U
BIT # 2 - ORIENT - RIH WITH FLEC DC'S
22:00 - 22:30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
22:30 - 23:00 0.50 DRILL P INT1 BHA - RIH WITH HWDP - JARS - PULSE TEST MWD
23:00 - 00:00 1.00 DRILL P INT1 CON'T RIH WITH DP TO 3213'
10/212002 00:00 - 01 :30 1.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3213' TO 3518'- WOB 20K-
GPM 500 - PP ON 2550 - PP OFF 2450 - RPM 120 - TQ ON
5K TQ OFF 4K
01 :30 - 02:00 0.50 DRILL N SFAL INT1 MUD PUMP # 1 - CHECK SUCTION VALVES - TIGHTEN
LINES
02:00 - 06:30 4.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3518' TO 4546' - WOB 25K TO
30K - GPM 500 - PP ON 3050 - PP OFF 2900 - RPM 120 - TO
ON 7K - TO OFF 5K - PU 93K - SO 62K - ROT 77K
06:30 - 08:00 1.50 DRILL P INT1 CIRC FOR SHORT TRIP - 3 X BU - OBSERVE WELL
08:00 - 11 :00 3.00 DRILL P INT1 PULL OUT HOLE TO 3610' - SWABBING TIGHT - PUMP OUT
FROM 3610' TO 720' - GPM 500
11 :00 - 11 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
11 :30 - 13:00 1.50 DRILL P INT1 RIH TO 4455' - WASH / REAM FROM 4455' TO 4546'
13:00 - 20:30 7.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4546' TO 5834' - WOB 25K TO
30K - GPM 500 - PP ON 3450 - PP OFF 3300 - RPM 120 - TO
ON 10K - TO OFF 7K - PU 112K - SO 50K - ROT 82K
20:30 - 21 :30 1.00 DRILL N RREP INT1 SWIVEL PACKING - PULL STAND OUT OF HOLE - TIGHT -
INSTALL CIRC HEAD PIN - CIRC HOLE WITH 30 STKS 107
Printed: 1012112002 8:51:00AM
')
Operations Summary Report
Legal Well Name: MPS-29
Common Well Name: MPS-29 Spud Date: 9/30/2002
Event Name: DRILL +COMPLETE Start: 9/29/2002 End: 1 0/16/2002
Contractor Name: DOYON Rig Release: 10/16/2002
Rig Name: DOYON 141 Rig Number: 141
Date From - To Hours Task Code NPT Phase Description of Operations
10/212002 20:30 - 21:30 1.00 DRILL N RREP INT1 GPM @ 500 PSI - CHANGE OUT SWIVEL PACKING - WASH
BACK TO BTM
21 :30 - 00:00 2.50 DRILL P INT1 DIRECTIONAL DRILL FROM 5834' TO 6134' - WOB 25K TO
30K - GPM 500 - PP ON 3500 - PP OFF 3400 - RPM 120 - TO
ON 10K - TQ OFF 7K - PU 115K - SO 50K - ROT 78K
10/3/2002 00:00 - 08:30 8.50 DRILL P INT1 DIRECTIONAL DRILL FROM 6134' TO 7508' - WOB 25K TO
30K - RPM 120 - TQ ON 12K - TQ OFF 8K - GPM 500 - PP
ON 3770 - PP OFF 3600 - PU 135K SO 50K - ROT 85K
08:30 - 11 :00 2.50 DRILL P INT1 CIRCULATE HOLE CLEAN 3 X BU - GPM 500 - RPM 120-
OBSERVE WELL - WELL STATIC
11 :00 - 17:30 6.50 DRILL P INT1 PUMP OUT OF HOLE TO 2200' - GPM 500 - CON'T PULL
OUT HOLE TO BHA
17:30 - 21 :00 3.50 DRILL P INT1 STAND BACK 4 STANDS OF 5" HWDP - JARS - UD 6 JTS
OF 5" HWDP - STAND BACK FLEX DC'S - BREAK BIT - M/U
NEW BIT - (PRECAUCTIONARY BIT CHANGE FOR T.D.
WELL) - DOWN LOAD MWD - UP LOAD MWD - RIH WITH
FLEX DC'S - 5" HWDP - JARS - PULSE TEST MWD
21 :00 - 21 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE - BLOCKS
21 :30 - 00:00 2.50 DRILL P INT1 RIH WITH 5" DP TO 5830' - FILL PIPE 25 STDS AND 23
STANDS - (5000' TO 5830') STRING TAKING WEIGHT
WORKING IN HOLE - FRICTION WT
1014/2002 00:00 - 01 :30 1.50 DRILL P INT1 PUMPING / REAMING IN HOLE FROM 5830' TO 6813' - RIH
FROM 6813' TO 6954' - PUMP IN HOLE FROM 6954' TO
7175' - RIH FROM 7175' TO 7361'- PUMP / REAM FROM
7361' TO 7508'
01 :30 - 18:30 17.00 DRILL P INT1 DIRECTIONAL DRILL FROM 7508' TO 9248' - T.D. 97/8"
HOLE - WOB 15K TO 20K - RPM 120 - TQ ON 12K - TO OFF
10K - GPM 480 - PP ON 4130 - PP OFF 4000 - PU 137K - SO
48K - ROT 86
18:30 - 00:00 5.50 DRILL P INT1 CIRCULATE HOLE CLEAN - 4 X BU - 35000 STKS - RPM 120
- GPM 480 - STAND ONE STAND BACK EVERY 4000
STROKES PUMPED - OBSERVE WELL - WELL STATIC
101512002 00:00 - 01 :00 1.00 DRILL P INT1 PUMP OUT FROM 8425' TO 7500' - GPM 480 - NO
PROBLEMS HOLE IN GOOD SHAPE
01 :00 - 05:00 4.00 DRILL P INT1 POOH FROM 8425' TO BHA @ 541'
05:00 - 06:30 1.50 DRILL P INT1 PULL BHA - DOWN LOAD MWD - UD MWD - BREAK BIT -
UD MOTOR
06:30 - 07:30 1.00 DRILL P INT1 CUT DRLG LINE
07:30 - 08:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
08:00 - 09:00 1.00 DRILL P INT1 MAKE UP HOLE OPENER - RIH TO 1500'
09:00 - 13:00 4.00 DRILL P INT1 CONTROL REAM FROM 1500' TO 3466' @ 6 STANDS PER
HOUR (INCLUDING CONNECTION TIME) - WOB 0 - RPM
150 - TQ 8K - 550 GPM - PP 1250
13:00 -14:30 1.50 DRILL P INT1 RIH TO 7951'
14:30 - 17:30 3.00 DRILL P INT1 CONTROL REAM FROM 7951' TO 9248' @ 6 STANDS PER
HOUR (INCLUDING CONNECTION TIME) - WOB 0 TO 5K -
RPM 150 - TQ 10K - PP 3000 - PU 135K - SO 51K - ROT 88K
17:30 - 21 :30 4.00 CASE P INT1 CIRCULATE CONDITION HOLE AND MUD - GPM 550 - PP
3200 - RPM 150 - TO 10K - SPOT LUB PILL @ BIT -
OBSERVE WELL - WELL STATIC - PUMP DRY JOB
21 :30 - 00:00 2.50 CASE P INT1 POOH FROM 9248' TO 3000' - HOLE IN GOOD CONDITION
10/6/2002 00:00 - 01 :00 1.00 CASE P INT1 POH FROM 3000' TO BHA @ 477'
01 :00 - 02:30 1.50 CASE P INT1 BHA - LAY DOWN 5" HWDP - JARS - FLEX DC'S -
Printed: 10/21/2002 8:51:00AM
, )
)
BP EXPLORATION
Operations Summary Report
Page 3 of?
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/6/2002 01 :00 - 02:30 1.50 CASE P INT1 STABILIZERS - HOLE OPENER
02:30 - 03:30 1.00 CASE P INT1 CHANGE SAVOR SUB TO 41/2 IF
03:30 - 05:00 1.50 CASE P INT1 RIG UP CASING TOOLS TO RUN 7 5/8" CASING - PJSM
05:00 - 13:30 8.50 CASE P INT1 PICK UP AND RUN 225 JTS OF HYDRIL 521 75/8" 29 #
CASING + XO JOINTS - (TOTAL 9209' RAN) -LANDED WITH
50K ON WEIGHT INDICATOR - BLOCK WEIGHT 35K - 15K
CASING WEIGHT LEFT - SHOE 9237' - FLOAT COLLAR
9150' - NO CIRCULATION REQUIRED - NO BRIDGES-
HOLE IN EXCELLENT SHAPE
13:30 - 18:00 4.50 CASE P INT1 CIRCULATE AND CONDITION MUD / HOLE FOR CEMENT
JOB - 8 BPM - 500 PSI
18:00 - 23:00 5.00 CASE P INT1 PUMP 10 BBLS WATER - TEST LINES TO 3500 PSI - PUMP
40 BBLS WATER @ 7 BPM - 500 PSI- PUMP 47 BBLS
SPACER 10.2 PPG - DROP BOTTOM PLUG - PUMP 3 BBLS
SPACER - @ 6.5 BPM - 450 PSI- PUMP TOTAL 1351 BBLS
LEAD CEMENT @ 5.5 BPM - 1150 BBLS BACK STARTED
GETTING RED DYE - 1300 BBLS LOST RETURNS -
PUMPED ADDITIONAL 51 BBLS LEAD CEMENT NO
RETURNS - SWITCHED TO TAIL CEMENT - PUMPED 123
BBLS OF 15.8 TAIL @ 4 BPM - DROP TOP PLUG-
DISPLACE WITH 30 BBLS WATER HOWCO - TURN OVER
TO RIG - NO RETURNS
23:00 - 00:00 1.00 CASE P INT1 DISPLACE CEMENT @ 5.5 BPM WITH RIG PUMP
10fi/2002 00:00 - 00:30 0.50 CASE P INT1 CON'T DISPLACE CEMENT @ 5.5 BPM - BUMPED PLUG
WITH 4668 STKS - 392 BBLS - WITH 2400 PSI - HELD FOR 3
MINS - BLEED OFF PRESSURE - FLOATS HELD - PUMP
EFF 94% - NO CEMENT TO SURFACE
00:30 - 01 :30 1.00 CASE P INT1 DRAIN / FLUSH DIVERTOR RISER - LAY DOWN LANDING
JOINT - RIG DOWN CASING TOOLS
01 :30 - 03:00 1.50 CASE P INT1 NIPPLE DOWN DIVERTOR
03:00 - 04:00 1.00 CASE P INT1 CHANGE OUT TOP DRIVE SAVOR SUB TO 4"
04:00 - 05:30 1.50 CASE P INT1 RIG UP FOR TOP JOB - RUN 1" IN TO 115' - SOLID - WORK
1 " DOWN 3' - PULL 1" PLUGGED WITH GREEN CEMENT -
CLEAN 1" - RUN IN HOLE 110'- BREAK CIRC - PUMP 34
BBLS OF LEAD AT 10.7 PPG - 3 BBLS CEMENT BACK -
WASH UP / CLEAN CELLAR
05:30 - 06:30 1.00 CASE P INT1 ORIENT - NIPPLE UP WELL HEAD - (FMC GEN 6 5K) - TEST
FOR 10 MINS@ 1000 PSI
06:30 - 08:00 1.50 CASE P INT1 NU BOP'S
08:00 - 11 :30 3.50 CASE P INT1 PU 120 JOINTS 4" DRILL PIPE - CIRC DRILL PIPE CLEAN
11 :30 - 12:00 0.50 CASE P INT1 POOH WITH 4" DRILL PIPE
12:00 - 17:00 5.00 BOPSUR P INT1 RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250
LOW 5 MINS - 2500 HIGH 5 MINS - PIPE RAMS - BLIND
RAMS - CHOKE MANIFOLD - HYD KILL - HYD CHOKE -
MANUAL KILL - MANUAL CHOKE - UPPER / LOWER IBOP -
FLOOR SAFETY VALVES - 250 LOW 5 MINS - 4000 HIGH 5
MINS ALL TEST WERE GOOD - ACCUMULATOR TEST -
3000 /1900 - 38 SEC FOR 200 PSI - 3 MINS 45 SECS TO
3000 PSI- 5 BOTTLES 2100 PSI AVG
17:00 - 17:30 0.50 BOPSUR P INT1 RIG DOWN TESTING EQUIPMENT - INSTALL WEAR RING
17:30 - 19:00 1.50 CASE P INT1 PU BHA - SCRIBE - UP LOAD MWD - PULSE TEST MWD -
19:00 - 22:30 3.50 CASE P INT1 RIH TO 9141'
22:30 - 23:30 1.00 CASE P INT1 BREAK CIRC - TEST CASING TO 4000 PSI FOR 30 MINS
Printed: 1012112002 8:51:00 AM
)
')
B.F>..æ*~lliø~TION
Operations SUR1l11aryReþóft
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
1017/2002 22:30 - 23:30 1.00 CASE P INT1 RECORDED ON CHART
23:30 - 00:00 0.50 CASE P INT1 TAG UP ON PLUG 9149' - DRILL PLUG FLOAT COLLAR
9150' - FIRM CEMENT TO 9235'
10/8/2002 00:00 - 00:30 0.50 CASE P INT1 DRILL SHOE @ 9236' - 30' NEW HOLE @ 9278'
00:30 - 01 :30 1.00 CASE P INT1 CIRC BTMS UP - BALANCE MUD WT TO 8.9 PPG - FOR FIT
01 :30 - 02:00 0.50 CASE P INT1 FIT - 540 PSI - 8.9 PPG - 4192lVD = 11.38 PPG EMW
02:00 - 03:00 1.00 CASE P INT1 DISPLACE OLD 8.9 PPG SPUD MUD WITH NEW 9.1 PPG
FLOPRO
03:00 - 00:00 21.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 9278' TO 11350' - WOB 3K TO
13K - RPM 100 - TQ ON 7K - TQ OFF 6K - GPM 250 - PP ON
2350 - PP OFF 2000 - PU 100K - SO 50K - ROT 82K
10/9/2002 00:00 - 15:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 11350' TO 12950'- T.D. OB
LATERAL - WOB 3K TO 13K - RPM 100 - TQ ON 7K - TQ
OFF 6K - GPM 250 - PP ON 2450 - PP OFF 2200 - PU 120 -
SO 52 - ROT 84
15:00 - 18:00 3.00 CASE P COMP CIRCULATE CLEAN UP HOLE - CBU 3 X - RPM- 100 - GPM
250 - PP 2150 - PUMP LUB PILL
18:00 - 21 :30 3.50 CASE P COMP PUMP OUT FROM 12855' TO 9350' - GPM 250 - HOLE IN
GOOD SHAPE
21 :30 - 00:00 2.50 CASE P COMP POOH @ 1200'
10/1012002 00:00 - 01 :00 1.00 CASE P COMP CON'T POOH - (BHA) STAND BACK FLEX DC'S - JARS -
HWDP - LAY DOWN MWD - BREAK BIT - LAY DOWN
MOTOR
01 :00 - 01 :30 0.50 CASE P COMP RIG UP CASING TOOLS - (PJSM ON PICKING UP LINER)
01 :30 - 04:00 2.50 CASE P COMP PICK UP 90 JOINTS 4.5" L-80 12.6# SLOTTED LINER - 2
JOINTS 4.5" L-80 12.6# BLANK LINER - BAKER 5.5" X 7 5/8"
HMC LINER HANGER - BAKER 5.5" X 7 5/8" ZXP LINER TOP
PACKER - BAKER 7" TIE BACK SLEEVE - BAKER RUNNING
TOOL
04:00 - 07:00 3.00 CASE P COMP CON'T RIH WITH LINER ON 4" DRILL PIPE to 12950'
07:00 - 10:00 3.00 CASE N DPRB COMP DROPPED 29/32" BALL AND CIRCULATED DOWN AT 4
BPM. NO PRESSURE INCREASE. WORKED PIPE AND
CONTINUED CIRCULATING AT VARIOUS RATE. NO
SUCCESS. DROPPED SECOND 29/32" BALL AND
DISPLACED DOWN AT 3 BPM. DID NOT BUMP.
10:00 - 10:30 0.50 CASE P COMP DROP 1 3/4" BALL - HANG LINER - SET PACKER -
RELEASE FROM LINER
10:30 -14:00 3.50 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH
WITH LINER RUNNING TOOL - LAY DOWN RUNNING
TOOL
14:00 -17:30 3.50 S1WHIP P PROD2 PJSM - MAKE UP BAKER WHIPSTOCK ASSY - WITH MWD -
ORIENT MWD WITH WHIPSTOCK - PICK UP SINGLE DP -
12 DC'S - 17 HWDP - PULSE TEST MWD
17:30 - 21 :30 4.00 S1WHIP P PROD2 TIH WITH WHIPSTOCK TO 8700' (RUNNING SPEED 2 MINS
PER STD)
21 :30 - 22:30 1.00 S1WHIP P PROD2 CUT DRILLING LINE - RIG SERVICE
22:30 - 23:00 0.50 S1WHIP P PROD2 RIH WITH WHIPSTOCK @ 8780' - ORIENT TO HIGH SIDE
23:00 - 23:30 0.50 S1WHIP P PROD2 SET BTM ANCHOR - SHEAR OFF DISCONNET WITH 40K
DOWN WEIGHT
23:30 - 00:00 0.50 S1WHIP P PROD2 MILLING WINDOW - TOP 8842' TO 8844' - WOM 4K - RPM
80 - TO ON 4K - TO OFF 3K - GPM 261 - PP 1300 - PU 108 -
SO 74
10/11/2002 00:00 - 04:00 4.00 STWHIP P PROD2 MILLING WINDOW FROM 8844' TO 8869' (TOP OF WINDOW
Printed: 10/21/2002 8:51:ooAM
')
)
BP EXPLORATION
Operations Summary Report
Page 5 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/11/2002 00:00 - 04:00 4.00 S1WHIP P PROD2 8842' BOTTOM WINDOW 8854') - WOM 3K TO 5K - GPM 261
- PP 1350 - RPM 80 - TO ON 4K - TQ OFF 3K
04:00 - 05:00 1.00 S1WHIP P PROD2 CIRCULATE HI VIS SWEEP - OBSERVE WELL - PUMP DRY
JOB - WORK MILLS THROUGH WINDOW - NO DRAG OR
OVERPULLS
05:00 - 08:00 3.00 S1WHIP P PROD2 POOH WITH MILLING ASSY. MILL IN GOOD SHAPE AND IN
GAUGE
08:00 - 08:30 0.50 S1WHIP P PROD2 FLUSH BOP STACK OF METAL CUTTINGS. FUNCTIONED
RAMS AND FLUSHED AGAIN
08:30 - 10:30 2.00 S1WHIP P PROD2 CHANGED PULSER IN MWD. PICKED UP MOTOR SET AT
1.5 DEGREE AND OREINTED. MADE UP 6-1/8" SECURITY
RERUN FM2643 PDC BIT. UNLOADED MWD
10:30 - 13:30 3.00 S1WHIP P PROD2 TRIPPED IN HOLE WITH DRILLING ASSEMBLY FILLING
DRILL PIPE EVERY 30 STANDS TO 8770'. BROKE
CIRCULATION AND ORIENTED MOTOR TO HIGH SIDE.
SHUT DOWN PUMP AND TRIPPED THROUGH WINDOW
WITH NO PROBLEMS. TAGGED BOTTOM AT 8869'
13:30 - 00:00 10.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 8869' TO 9575' - WOB 3K to 9K
- RPM 100 - TO ON 6K - TO OFF 5K - GPM 250 - PP ON 1600
- PP OFF 1550 - PU 11 OK - SO 73K - ROT 92K - (BASE OF
OA 9302 - START OF SAND)
10/12/2002 00:00 - 00:00 24.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 9575' TO 12250' - WOB 3K TO
15K - RPM 100 - TQ ON 9K - TQ OFF 8K - GPM 250 - PP ON
2430 - PP OFF 2180 - PU 118K - SO 40K - ROT 83K
10/13/2002 00:00 - 07:00 7.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 12250' TO 12950' - WOB 3K TO
15K - RPM 100 - TO ON 9K - TO OFF 8K - GPM 250 - PP ON
2450 - PP OFF 2100 - PU 117 - SO 40 - ROT 80
07:00 - 12:00 5.00 CASE P COMP CIRCULATE 4 X - RAISE LUBRICANTS TO 5% IN SYSTEM
12:00 - 16:00 4.00 CASE P COMP PUMP OUT FROM 12950' TO 8870' - PULL TROUGH LINER
FROM 8870' TO 8800' WITH OUT PUMP - NO PROBLEMS
16:00 -19:00 3.00 CASE P COMP OBSERVE WELL - WELL STATIC - PUMP DRY JOB - POOH
TO BHA
19:00 - 20:30 1.50 CASE P COMP STAND FLEX DC'S BACK - DOWN LOAD MWD - FLUSH
MOTOR - RE-CONF MOTOR - BREAK OFF BIT - LAY DOWN
MOTOR
20:30 - 21 :30 1.00 CASE P COMP PICK UP BAKER WHIPSTOCK RETRIEVING ASSEMBLY -
RIH WITH DC'S / HWDP - PULSE TEST MWD
21 :30 - 00:00 2.50 CASE P COMP RIH WITH WHIPSTOCK RETRIEVING TOOL TO 8170' -
FILL PIPE EVERY 30 STANDS
10/14/2002 00:00 - 00:30 0.50 CASE P COMP CON'T RIH TO 8774' - WITH RETREIVING TOOLS
00:30 - 01 :00 0.50 CASE P COMP ORIENT TOOL TO HIGH SIDE - RIH TO 8842' - LATCH
ONTO WHIPSTOCK - PULL TO 165K - OBSERVE WELL -
WELL STATIC - PULL 5 STANDS - PUMP DRY JOB
01 :00 - 04:00 3.00 CASE P COMP POOH TO BHA
04:00 - 06:00 2.00 CASE P COMP LAY DOWN MWD - BAKER RETRIEVING ASSY- LAY DOWN
WHIPSTOCK - LAY DOWN RETRIEVING TOOLS
06:00 - 06:30 0.50 CASE P COMP RIG UP CASING TOOLS - PJSM
06:30 - 10:00 3.50 CASE P COMP PICK UP 89 JTS 4.5" 12.6# L-80 SLOTTED LINER - 13 JTS
4.5" 12.6# L-80 SOLID LINER - (TOTAL RUN 102 JTS)(TOTAL
FOOTAGE RUN 4091') - BAKER HOOK WALL HANGER
WITH 6' TIE BACK SLEEVE -
10:00 -14:30 4.50 CASE P COMP RIH WITH LINER ON 4" DP TO 12911' - RAN 13 STANDS OF
4.75" DC'S /3.5" HWDP 15 STANDS FROM SURFACE FOR
Printed: 1012112002 8:51:00 AM
')
)
fjPË~P>l..OAATION
øp~ratiøn§..~iUmd1ê:1ry. .Re.port
Pagé60f 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-29
MPS-29
DRILL +COMPLETE
DOYON
DOYON 141
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Date From - To Hours Task Code NPT Phase Description of Operations
10/14/2002 10:00 - 14:30 4.50 CASE P COMP ADDITIONAL WEIGHT - LINER WENT TO BTM WITHOUT
ORIENTION AT WINDOW - HOOK LINER 1ST ATTEMPT ON
WINDOW
14:30 - 16:00 1.50 CASE P COMP PUMP BALL TO SEAT - PRESSURE UP TO 2700 PSI -
RELEASE BAKER HR SETTING TOOL - BLEED PRESSURE
TO 0 - VERIFY RELEASE WITH 6' PICK UP - BLOW BALL
SEAT - OPEN CIRC SUB WITH 3700 PSI
16:00 - 16:30 0.50 CASE P COMP POOH 60' - CBU - OBSERVE WELL - WELL STATIC - PUMP
DRY JOB
16:30 - 17:30 1.00 CASE P COMP POH - STAND BACK 41 STANDS DRILL PIPE
17:30 - 22:30 5.00 CASE P COMP POH LAYING DOWN 4" DRILL PIPE - (132 JTS) -154.75"
DC'S - 15 JTS HWDP 3.5" - LAY DOWN LINER RUNNING
TOOL - (TOTAL STANDS IN DERRICK 95 - TOTAL
FOOTAGE 8876')
22:30 - 23:00 0.50 BOPSUR P COMP PULL WEAR RING
23:00 - 00:00 1.00 BOPSURP COMP RIG UP TO TEST BOP'S - TEST BOP'S - ANNULAR 250
LOW 5 MINS - 2500 HIGH 5 MINS - ALL OTHER TEST 250
LOW 5 MINS - 4000 HIGH 5 MINS - UPPER IBOP - LOWER
IBOP - FLOOR SAFETY VALVES
10/15/2002 00:00 - 02:30 2.50 BOPSUR P COMP TEST BOPS - PIPE RAMS - BLIND RAMS - CHOKE
MANIFOLD - HYD VALVE ON CHOKE - HYD VALVE ON KILL
- MANUAL VALVE ON CHOKE - MANUAL VALVE ON KILL-
ALL TEST WERE GOOD - TEST PRESSURE 250 LOW 5
MINS - 4000 HIGH 5 MINS - (JEFF JONES WITH AOGCC
WITNESSED THE BOP TEST)
02:30 - 03:00 0.50 BOPSUR P COMP RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG -
INSTALL WEAR RING
03:00 - 06:00 3.00 RUNCOW COMP MAKE UP 3.5" MULE SHOE - RIH
06:00 - 07:30 1.50 RUNCOW COMP CUT DRILL LINE AND SERVICED TOP DRIVE
07:30 - 11 :00 3.50 RUNCOW COMP DISPLACED MUD IN HOLE WITH 600 BBLS OF 8.8 #/GAL
OF NACL AND FOLLOWED WITH 450 BBLS OF 9.2 #/GAL
NACL. PUMPED 120 SPM AND ROTATED PIPE AT 120 RPM
WORKED PIPE FULL STAND. 9.2 BRINE PREHEATED TO
120 DEGREES BEFORE DISPLACEMENT
11 :00 - 18:30 7.50 RUNCOW COMP LAYING DOWN DRILL PIPE, PULL WEAR RING, HOLE
TAKING 9.2 BRINE AT THE RATE OF 4 BBLS HR.
18:30 - 19:00 0.50 RUNCOW COMP PJSM, RIG UP TO RUN TUBING
19:00 - 00:00 5.00 RUNCOW COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP
COMPLETION TOTAL JTS RUN 55 JTS 2300 FT
RUNNING TUBING AT A SLOWER PACE THE NORMAL,
WITH THE HOLE TAKING BRINE.
LOST TOTAL OF 40 BBLS OF BRINE TO WELL
10/16/2002 00:00 - 07:00 7.00 RUNCOW COMP PICKING UP 4.512.6# L-80 IBT TUBING AND JET PUMP
COMPLETION TOTAL JTS RUN 196 JTS P/U WT 92K S/O
WT 65K
07:00 - 08:00 1.00 RUNCOW COMP PICK UP HANGER AND TIE IN 1- WIRE, LAND TUBING,
PACKER DEPTH 8123, GLM DEPTH 2214, XN NIPPLE 8168,
JET PUMP SENSOR 8095, SLIDING SLEEVE 8076,
PRESSURE GAUGE 8055
08:00 - 08:30 0.50 RIGD P COMP TEST lWC TO 1000 PSI
08:30 - 10:00 1.50 RIGD P COMP CHANGE RAMS TO 5" NIPPLE DOWN BOPS
10:00 - 11 :30 1.50 RIGD P COMP NIPPLE UP ADAPTER FLANGE, TEST ADAPTER FLANGE
TO 5,000 PSI
Printed: 1012112002 8:51:ooAM
')
')
Bp>..E~PbQAATIQN
OperéltionSSi8.jAJR1é1ryReport
Legal Well Name: MPS-29
Common Well Name: MPS-29
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 141
- To Hours Task Code NPT
10/16/2002 11 :30 - 12:30 1.00 RIGD P
12:30 - 13:00 0.50 RIGD P
13:00 - 17:30 4.50 RIGD P
17:30 - 18:30 1.00 RIGD P
18:30 - 19:30 1.00 RIGD P
19:30 - 20:30 1.00 RIGD P
20:30 - 22:00 1.50 RIGD P
22:00 - 22:30 0.50 RIGD P
22:30 - 00:00 1.50 RIGD P
Phase
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
Start: 9/29/2002
Rig Release: 10/16/2002
Rig Number: 141
Spud Date: 9/30/2002
End: 10/16/2002
Description of Operations
NIPPLE UP 41/16 CIW TREE AND TEST TO 5.000 PSI
PULL TWC WITH LUBRICATOR
RIG UP HB&R CIRC 9.3 BRINE AND WARM TO 100
DEGREES
DROP BALL. PRESSURE UP TO 4,000 PSI TO SET PACKER
AND TEST TUBING, RECORD FOR 30 MIN.
BLEED PRESSURE IN TUBING TO 3,000 PSI AND
PRESSURE ANNULUS TO 4,500 PSI, RECORDED FOR 30
MIN.
BLEED TUBING PRESS TO 2,000 AND SHEARED RP
VALVE, PUMP 82 BBLS OF DIESEL DOWN ANNLUS TO
FREEZE PROTECT WELL
LET DIESEL U-TUBE IN TO TUBING
RIG UP LUBRICATOR AND SET BPV
SECURE TREE. CLEAN CELLAR AND PITS
RIG RELEASE TO MOVE TO MPS-19 @ 24:00 10/16/2002
Printed: 10/21/2002 8:51:ooAM
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re:Distribution of Survey Data for Well MPS-29L1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 8,792.06' MD
Window / Kickoff Survey 8,842.00' MD (if applicable)
Projected Survey: 12,950.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
NOV 0 ì
,
Attachment(s)
AJ¡:9KS. (V v
J;¡ \.'\ .' ,
* ~"< ':'!.~¡.,......~
/:' f"-.J,., .. ., .¡~ ,,;¡;.w'!~
". ... : I JfJlt,::.. '~.I
d Q9~/9~
31-0ct-02
Sperry-Sun Ðrilling Services
Mllne:;Po;nt Unit
'IIPXA
Miln. " t MPS
1
Job No. AKZZ22160iSU,.".yed: 13 October, 2002
SUI¥1
lIeport
28 OfJ.IØbjr, 2002
Your Ref: API 500292311960
Surface Coordinates: 5999936.18N, 565670.94£ (70° 24' 36.9759" N, 149027'54.9398" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to ProJeçt H Reference: 999936.18 N, 65670.94 E (Grid)
Surface Coord/na- relative. to Structure: 32.89 S, 674.38 W(True)
Kelly EJu$hl"g:6Jf4f(1ft~ve Mean Sea Level
Elevation relatlvè'1ø}...'V Reference: 66.60ft
Elevation 'ØtQ.;$tructure: 66.6Oft
~,.....'.,.'..t.'...,',',...'".M,.........,J',.!.,.,.....3",.,;.....'....-.",...,,!.I.:...'..'..;..".".'.".'.,:......'..-.:..'.,-...1"...,...,. ".".....,...,.......... un
C.';z~f,""I'."" "'""
"-,--',.,-. è;'!~""---'--~-~":-",-~--;::_---"-,, .-"-, ,'-- ..'-.- '-'.
O"~'t,/,é..~:-;" ' '"VleS"s
, " A' . .lIburton Company
DEF"N T'VE
'~'
'~
Survey Ref: svy10206
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29L 1
Your Ref: AP15fJ0292311960
Job No. AKZZ22160, Surveyed: 13 October, 2002
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth, Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
8792.09 87,350 336,610 4105.86 4172.46 5999.41 N 3414.64 W 6005905.33 N 562203.68 E 6355.88 Tie On Point
-8842.00 87.580 338.250 4108.07 4174.67 - 6045.45 N 3433.78 W 6005951.20 N 562184.14 E 3.315 6403.84 Window Point
8887.69 92.090 339.580 4108.20 4174.80 . . 6088.07 N 3450.21 W 6005993.67 N 562167.33 E 10.291 6448.08
8936.67 94.810 341.000 4105.25 4171.85 6134.09 N 3466.70 W 6006039.55 N 562150.44 E 6.262 6495.71
8980,62 93.200 342.280 4102.19 4168.79 6175.70N 3480.51 W 6006081.03 N 562136.26 E 4.675 6538.64
9029.99 91.970 345.550 4099.96 4166.56 6223.08 N 3494.17 W 6006128.29 N 562122.19 E 7.070 6587.29 -
9074.88 92.530 345.990 4098.20 4164.80 6266.56 N 3505.20 W 6006171.67 N 562110.78 E 1.586 6631.75
9124.94 93.630 346.070 4095.51 4162.11 6315.06N 3517.27 W 6006220.07 N 562098.28 E 2.203 6681.34
9168.74 93.940 350.660 4092.61 4159.21 6357.86 N 3526.08 W 6006262.79 N 562089.10 E 10.480 6724.87
9218.54 93.260 351.110 4089.49 4156.09 6406.93 N 3533.95 W 6006311.79 N 562080.79 E 1.636 6774.52
9261.84 92.580 355,190 4087.28 4153.88 6449.86 N 3539.11 W 6006354.67 N 562075.26 E 9.540 6817.76
9310.65 93.640 0.350 4084.63 4151.23 6498.54 N 3641.00 W 6006403.34 N 562072.93 E 10.777 6866.33
9355.56 92.090 4.960 4082.38 4148.98 6543.33 N 3538.93 W 6006448.15 N 562074.62 E 10.817 6910.58
9404,34 89,140 7.770 4081.86 4148.46 6591.80 N 3533.52W 6006496.66 N 562079.60 E 8.351 6958.08
9449.08 88.220 13.470 4082.89 4149.49 6635.74 N 3525.28 W 6006640.67 N 562087.45 E 12.902 7000.77
9500.96 87.660 16.200 4084.76 4151.36 6685.86 N 3512.01 W 6006590.90 N 562100.28 E 5.368 7049.00
9542.18 87.230 11.830 4086.60 4153.20 6725.80 N 3502.04 W 6006630.93 N 562109.90 E 10.642 7087.51
9595.90 89.940 14.880 4087.92 4154.52 6778.04 N 3489.63W 6006683.28 N 562121.84 E 7.593 7137.96
9636.80 90.490 20.080 4087.77 4154.37 6817.04 N 3477.35W 6006722.38 N 562133.78 E 12.785 7175.26
9684,34 90.430 26.330 4087.39 4153.99 6860.71 N 3458.63W 6006766.21 N 562152.12 E 13.147 7216.46
9728."16 88.640 31 ,930 4087.75 4154.35 6899.49 N 3437.02 W 6006805.19 N 562173.39 E 13.234 7252.46
9777,35 89,570 38.010 4088.51 4155.11 6939.29 N 3409.19 W 6006845.22 N 562200.87 E 12.657 7288.75
9822.89 87.350 41,610 4089.73 4156.33 6974.25 N 3380.05 W 6006880.44 N 562229.70 E 9.285 7320.08
9871.37 87,720 47,710 4091.82 4158.42 7008.68 N 3346.02 W 6006915.17 N 562263.43 E 12.594 7350.33 ~
9915,65 88.520 53.480 4093.27 4159.87 7036.76 N 3311.84W 6006943.55 N 562297.36 E 13.148 7374.24
9962,64 87.970 54.460 4094.71 4161.31 7064.39 N 3273.85 W 6006971.51 N 562335.10 E 2.391 7397.26
10010.26 88.71 0 52.180 4096.09 4162.69 7092.82 N 3235.68W 6007000.28 N 562373.02 E 5.032 7421.06
1 0059,1 0 89.390 53.110 4096.90 4163.50 7122.45 N 3196.87 W 6007030.25 N 562411.57 E 2.359 7445.97
10102.53 89.570 52,720 4097.29 4163.89 7148.64 N 3162.22 W 6007056.74 N 562445.99 E 0.989 7467.95
10149.92 89.020 55,190 4097.88 4164.48 7176.52 N 3123.91 W 6007084.96 N 562484.05 E 5.339 7491.19
10195.44 87,540 55.420 4099.24 4165.84 7202.42 N 3086.50 W 6007111.18 N 562521.23 E 3.290 7512.56
10244.12 86.610 56.080 4101.73 4168.33 7229.78 N 3046.32 W 6007138.89 N 562561.17 E 2.342 7535.06
10289.49 87.170 55,750 4104,19 4170.79 7255.17 N 3008.80 W 6007164.61 N 562598.4 7 E 1 .432 7555.91
10337,05 86.430 54.600 4106.84 4173.44 7282.29 N 2969.82 W 6007192.07 N 562637.21 E 2.872 7578.31
10382.75 86~250 54,730 4109,76 4176.36 7308.66 N 2932.61. W 6007218.77 N 562674.18 E 0.486 7600,18
28 October, 2002 - 15:14 P,ge 20t5 DriJIQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29L 1
Your Ref: API 500292311960
Job No. AKZZ22160, Surveyed: 13 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth, Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
10431.65 84.890 52,560 4113.54 4180.14 7337.56 N 2893.35 W 6007248.02 N 562713.19 E 5.226 7624.31
10476.34 85.010 53.090 4117.47 4184.07 7364.46 N 2857.88 W 6007275.23 N 562748.42 E 1.211 7646.90
10524.97 85.560 52.600 4121.47 4188.07 .. 7393.73 N 2819.25 W 6007304.84 N 562786.79 E 1.512 7671.48
10569.66 87.100 51 .130 4124.33 4190.93 7421.27 N 2784.17 W 6007332.68 N 562821.62 E 4.759 7694.76
10618.18 85.750 48.570 4127.36 4193.96 7452.49 N 2747.16 W 6007364.23 N 562858.36 E 5.956 7721.46
10662.83 86.250 46.360 4130.47 4197.07 7482.60 N 2714.34 W 6007394.62 N 562890.91 E 5.063 7747.55 '~
10713.51 87.170 46.440 4133.38 4199.98 7517.49 N 2677.70 W 6007429.84 N 562927.24 E 1.822 7777 .94
10756.67 87.850 46.550 4135.26 4201.86 7547.18 N 2646.43 W 6007459.79 N 562958.25 E 1.596 7803.78
10805.75 87.970 45.760 4137.05 4203.65 7581.15 N 2611.06 W 6007494.08 N 562993.33 E 1.627 7833.41
10849.54 87.900 45.080 4138.62 4205.22 7611.87 N 2579.89 W 6007525.07 N 563024.22 E 1.560 7860.30
10898.97 86.980 43.430 4140.83 4207.43 7647.23 N 2545.43W 6007560.74 N 563058.37 E 3.819 7891.41
10943.70 88.090 44.290 4142.76 4209.36 7679.46 N 2514.46 W 6007593.23 N 563089.05 E 3.138 7919.81
10993.66 88.710 45.580 4144.15 4210.75 7714.81 N 2479.19 W 6007628.89 N 563124.01 E 2.864 7950.82
11037.51 88.590 43.990 4145.18 4211.78 7745.92 N 2448.31W 6007660.27 N 563154.62 E 3.635 7978.13
11087.51 88.220 42.600 4146.58 4213.18 7782.30 N 2414.04 W 6007696.95 N 563188.57 E 2.876 8010.28
11131 .04 88.400 41.860 4147.86 4214.46 7814.51 N 2384.79 W 6007729.42 N 563217.53 E 1.749 8038.87
11180.89 88.220 40.430 4149.33 4215.93 7852.04 N 2352.01 W 6007767.23 N 563249.98 E 2.890 8072.33
11224.37 88.340 39.650 4150.63 4217.23 7885.31 N 2324.05 W 6007800.75 N 563277.65 E 1.814 8102.12
11274.31 88.280 39.090 4152.11 4218.71 7923.90 N 2292.39 W 6007839.62 N 563308.97 E 1.127 8136.77
11317,78 86.120 41 .130 4154.23 4220.83 7957.10 N 2264.42 W 6007873.07 N 563336.65 E 6.831 8166.49
11369.35 85.130 39.710 4158.16 4224.76 7996.25 N 2231.08 W 6007912.50 N 563369.64 E 3.350 8201.49
114 11 .00 84.700 40.660 4161.86 4228.46 8027.94 N 2204.31 W 6007944.43 N 563396.13 E 2.496 8229.86
11460.22 85.870 43.310 4165.90 4232.50 8064.40 N 2171.50 W 6007981.17 N 563428.62 E 5.869 8262.25
11505.01 88.210 44.700 4168.22 4234.82 8096.57 N 2140.43 W 6008013.62 N 563459.41 E 6.074 8290.59
11554.72 88.950 45.410 4169.45 4236.05 8131.67 N 2105.25W 6008049.03 N 563494.27 E 2.063 8321.36
11598.17 89.260 46.090 4170.13 4236.73 8161.99 N 2074.13 W 6008079.62 N 563525.12 E 1.720 8347.85
11647.83 89.630 45.120 4170.61 4237.21 8196.73 N 2038.65W 6008114.67 N 563560.30 E 2.090 8378.23
11691.26 88.210 45.460 4171.43 4238.03 8227.28 N 2007.79W 6008145.49 N 563590.88 E 3.362 8404.98
11740.14 87.600 44.330 4173.21 4239.81 8261.88 N 1973.32W 6008180.39 N 563625.06 E 2.626 8435.34
11784.44 88.280 44.310 4174.81 4241.41 8293.55 N 1942.39 W 6008212.33 N 563655.71 E 1.536 8463.20
11834. 1 5 86.860 43.310 4176.91 4243.51 8329.39 N 1908.01 W 6008248.47 N 563689.77 E 3.493 8494.79
11877.98 87.040 43.670 4179.25 4245.85 8361.15 N 1877.88W 6008280.49 N 563719.61 E 0.917 8522.83
11927.81 87.850 44.650 4181.47 4248.07 8396.86 N 1843.20W 6008316.51 N 563753.98 E 2.550 8554.26
11971,10 88.650 45.220 4182.79 4249.39 8427.49 N 1812.64W 6008347.40 N 563784.27 E 2.269 8581.13
12021.57 88.520 44.650 4184.03 4250.63 8463.21N 1777.(n,W 6008383.43 N 563819.59 E 1.158 8612.46
28 October, 2002 - 15:14 Pflge30f5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for MIlne Point MPS - MPS-29L 1
Your Ref: API 5OØ292311960
Job No. AKZZ22160, Surveyed: 13 Octobèr, 2002
BP EXPLORA T/ON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth. Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
12064.92 88.950 43.960 4184.99 4251.59 8494.22 N 1746.74 W 6008414.71 N 563849.59 E 1.875 8639.74
12114.58 89.570 45.650 4185.63 4252.23 8529.45 N 1711.74 W 6008450.25 N 563884.27 E 3.625 8670.66
12158.64 89A50 45.260 4186.01 4252.61 .. 8560.36 N 1680.34 W 6008481.43 N 563915.39 E 0.926 8697.71
12209.14 89.750 44.240 4186.36 4252.96 8596.22 N 1644.79 W 6008517.60 N 563950.63 E 2.105 8729.19
12251.21 87 A20 45.130 4187 AO 4254.00 8626.12 N 1615.22 W 6008547.76 N 563979.94 E 5.928 8755A5
12298.54 86.300 46.020 4189.99 4256.59 8659.20 N 1581.47 W 6008581.14 N 564013.39 E 3.021 8784.38 -
12344.70 87.170 46.920 4192.62 4259.22 8690.94 N 1548.06 W 6008613.17 N 564046.52 E 2.709 8812.01
12391 A7 87.110 47.310 4194.96 4261.56 8722.73 N 1513.83 W 6008645.26 N 564080.47 E 0.843 8839.60
12437.95 86.620 48.230 4197.50 4264.10 8753.92 N 1479.47 W 6008676.75 N 564114.56 E 2.240 8866.59
12486.36 87.540 49.750 4199.96 4266.56 8785.64 N 1442.99 W 6008708.79 N 564150.76 E 3.667 8893.85
12530.84 87.970 49.470 4201.71 4268.31 8814.44 N 1409.13 W 6008737.89 N 564184.36 E 1.153 8918.52
12580.39 88.590 51.710 4203.19 4269.79 8845.88 N 1370.87 W 6008769.67 N 564222.34 E 4.689 8945.30
12624.51 89.020 51.210 4204.11 4270.71 8873.37 N 1336.37 W 6008797.45 N 564256.60 E 1.495 8968.58
12672.92 89A50 51.260 4204.76 4271.36 8903.67 N 1298.63 W 6008828.09 N 564294.08 E 0.894 8994.29
12717.39 89.320 49.900 4205.24 4271.84 8931.91 N 1264.28 W 6008856.63 N 564328.18 E 3.072 9018.34
12763A4 89.200 49.370 4205.83 4272.43 8961.73 N 1229.19 W 6008886.76 N 564363.00 E 1.180 9043.88
12810.84 89.630 50.900 4206.32 4272.92 8992.11 N 1192.81 W 6008917.46 N 564399.11 E 3.353 9069.82
12879.05 89.630 49.740 4206.76 4273.36 9035.66 N 1140.32 W 6008961.47 N 564451.22 E 1.701 9106.97
12950.00 89.630 49.740 4207.22 4273.82 9081.51 N 1086.18W 6009007.79 N 564504.96 E 0.000 9146.21 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US). ---/
Vertical Section is from Well and calculated along an Azimuth of 353.320° (True).
Magnetic Declination at Surface is 25.734°(29-Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.00ft.,
The Bottom Hole Displacement is 9146.24f1., in the Direction of 353.180° (True).
28 October, 2002 - 15:14
Pffge4ôf5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29L 1
Your Ref: API 500292311960
Job No. AKZZ22160, Surveyed: 13 October, 2002
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastlngs
(ft) (ft) (ft)
...
Comment
8792.09
8842.00
12950.00
4172.46
4174.67
4273.82
5999.41 N
6045.45 N
9081.51 N
3414.64 W
3433.78 W
1086.18 W
Tie On Point
Window Point
Projected Survey
~'
Survey too/øroqram for MPS-29L 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
178.00
0.00 178.00
178.00 12950.00
178.00 AK-1 BP _HG(MPS-29)
4273.82 AK-6 BP _IFR-AK(MPS-29)
--/
28 October, 2002 - 15:14
P.ge50f5
DrillQuest 3.03.02.002
')
)
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-29L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 8,792.09' MD
Window / Kickoff Survey 8,842.00' MD (if applicable)
Projected Survey: 12,950.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~~--Jqlo
31-0ct-02
R:. !\:C,'l".''\,' rr-I"\ IT;"" r..".,..,
~ ,,~J v/}~q ]
.:.i:;""" ...'L_~ ~!<. Pi ß
~ VI t4..:::;.."":J¡'lðtlw..'
,,10\1 t"'¡'" t'. '-',,'1
~ V . I ¡ L.",
IJ2~k~ O¡i f',
Sperry-Sun Drilling Services
Milne <Point Unit
SPXA
Milne Point MPS
. f.,1MWD
~
Job No.AKAfW221.SulWyed: 13 October, 2002
SUIVA .
lIeport
2B~'ì2002
Your R.f:API6D0292311960
Surface Coordinates: 5999936.18 N, 561flO.94E (700 24' 36.9759" H, 149027' 54.9398" W)
Grid Coordinate System:IlAD27 Alaska State Planes, Zone 4
~.
Surface Coordinates relatIve to ProJecJH Reference: 999936.18 H, 65670.94 E (Grid)
Surface CoordJnatesrela $tryotpre: 32.89 S, 674.38 W(True)
K,IIYllu'ÞI"'::ØQMeAfean Sea Level
ElevatlOnfflj' ,">'1l,Reference: 66.60ft
Elevatlon r.1..,.tiltructure: 66.6Oft
,'.-
-...... ,.'1.. .'!~.c.t'!:...L.........'.-.1If....,.'.'{i..~Ic.:...,....,... '.."....-X;:......'.">.. ."'....." .... .....
,.l~ ,,' ",t~" :r:"""'r~...n I
~:I;IIt;jh~~_(,>,i ,-., 'VIe:" Š
, "A Halliburton Company
Survey Ref: svy10208
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29L 1 MWD
Your Ref: AP/500292311960
Job No. AKMW2216tJ, .. Surveyed: 13 October, 2002
BP EXPLORA nON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
8792.09 87.350 336.900 4105.91 4172.51 6027.48 N 3356.06 W 6005933.92 N 562262.01 E 6376.96 Tie On Point
8842.00 87.580 338.250 4108.11 4174.71 6073.57 N 3375.08 W 6005979.84 N 562242.59 E 2.741 6424.95 Window Point
8887.69 92.090 339.580 4108.24 4174.84 H 6116.19 N 3391.51W 6006022.32 N 562225.78 E 10.291 6469.19
8936.67 94.810 341.000 4105.30 4171.90 6162.21 N 3408.00 W 6006068.19 N 562208.89 E 6.262 6516.81
8980.62 93.200 342.280 4102.23 4168.83 6203.82 N 3421.81 W 6006109.68 N 562194.72 E 4.675 6559.75
9029.99 91.970 345.550 4100.00 4166.60 6251.20 N 3435.47 W 6006156.94 N 562180.64 E 7.070 6608.39 -
9074.88 92.530 345.990 4098.24 4164.84 6294.68 N 3446.50 W 6006200.32 N 562169.23 E 1.586 6652.86
9124.94 93.630 346.490 4095.55 4162.15 6343.24 N 3458.39 W 6006248.76 N 562156.91 E 2.413 6702.47
9168.74 93.940 350.950 4092.66 4159.26 6386.08 N 3466.93 W 6006291.53 N 562147.99 E 10.185 6746.02
9218.54 93.260 351.480 4089.53 4156.13 6435.20 N 3474.52 W 6006340.58 N 562139.97 E 1.730 6795.69
9261.84 92.580 355.640 4087.32 4153.92 6478.16 N 3479.37 W 6006383.50 N 562134.74 E 9.723 6838.92
9310.65 93.640 0.750 4084.67 4151.27 6526.86 N 3480.91 W 6006432.18 N 562132.78 E 10.677 6887.47
9355.56 92.090 5.350 4082.43 4149.03 6571.64 N 3478.52 W 6006476.98 N 562134.77 E 10.796 6931.66
9404.34 89.140 8.180 4081.90 4148.50 6620.06 N 3472.78 W 6006525.45 N 562140.09 E 8.380 6979.09
9449.08 88.220 13.980 4082.93 4149.53 6663.94 N 3464.18 W 6006569.40 N 562148.30 E 13.122 7021.67
9500.96 87.660 16.750 4084.80 4151.40 6713.93 N 3450.45 W 6006619.51 N 562161.59 E 5.444 7069.72
9542.18 87.230 12.640 4086.64 4153.24 6753.75 N 3440.00 W 6006659.42 N 562171.69 E 10.015 7108.06
9595.90 89.940 15.670 4087.96 4154.56 6805.81 N 3426.87 W 6006711.60 N 562184.36 E 7.566 7158.24
9636.80 90.490 20.960 4087.81 4154.41 6844.63N 3414.02 W 6006750.52 N 562196.86 E 13.004 7195.29
9684.34 90.430 27.480 4087.43 4154.03 6887.96 N 3394.53 W 6006794.03 N 562215.97 E 13.715 7236.06
9728.76 88,640 32.700 4087.79 4154.39 6926.38 N 3372.27 W 6006832.64 N 562237.90 E 12.422 7271.63
9777.35 89.570 38.580 4088.55 4155.15 6965.84 N 3343.98 W 6006872.35 N 562265.85 E 12.250 7307.54
9822.89 87.350 42.280 4089.77 4156.37 7000.49 N 3314.46 W 6006907.25 N 562295.06 E 9.472 7338.51 ,-/
9871.37 87.720 48.160 4091.86 4158.46 7034.59 N 3280.09 W 6006941.66 N 562329.12 E 12.141 7368.39
9915.65 88.520 53.640 4093.31 4159.91 7062.49 N 3245.76 W 6006969.86 N 562363.20 E 12.500 7392.10
9962.64 87,970 54.590 4094.75 4161.35 7090.02 N 3207.71 W 6006997.72 N 562401.01 E 2.335 7415.02
10010.26 88.710 52.010 4096.13 4162.73 7118.46 N 31.69.55 W 6007026.50 N 562438.92 E 5.634 7438.83
10059.10 89.390 53.090 4096.94 4163.54 7148.16 N 3~30.78 W 6007056.53 N 562477.43 E 2.613 7463.82
10102.53 89.570 53.050 4097.34 4163.94 7174.25 N 3096.07 W 6007082.93 N 562511.91 E 0.425 7485.69
10149.92 89.020 55.430 4097.92 4164.52 7201.94 N 3'057.62 W 6007110.96 N 562550.12 E 5.154 7508.72
10195.44 87.540 55.780 4099.29 4165.89 7227.64 N 3020.07 W 6007136.99 N 562587.43 E 3.341 7529.88
10244.12 86.610 56.060 4101.77 4168.37 7254.88 N 2979.81 W 6007164.58 N 562627.46 E 1.995 7552.26
10289.49 87.170 56.110 4104.23 4170.83 7280.16 N 2942.21 W 6007190.19 N 562664.83 E 1.239 7572.99
10337.05 86.430 54.990 4106.89 4173.49 7307.02 N 2903.06 W 6007217.39 N 562703.75 E 2.819 7595.11
10382.75 86.250 54.350 4109.80 4176.40 7333.40 N 2865.85 W 6007244.09 N 562740.72 E 1.452 7616.98
28 October, 2002 - 15:23 Page 20f5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for MIlne Point MPS - MPS..29L 1 MWD
Your Ref: .API500292311960
Job No. AKMW22160, Surveyed: 13 October, 2002
BP EXPLORA T/ON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth, Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10431.65 84,890 52.730 4113.58 4180.18 7362.37 N 2826.64 W 6007273.41 N 562779.68 E 4.318 7641.19
10476.34 85.010 52.600 4117.51 4184.11 7389.37 N 2791.24 W 6007300.72 N 562814.83 E 0.395 7663.89
10524.97 85.560 52.300 4121.51 4188.11 .. 7418.90 N 2752.82 W 6007330.59 N 562853.00 E 1.287 7688.76
10569.66 87.100 50.780 4124.37 4190.97 7446.64 N 2717.90 W 6007358.63 N 562887.67 E 4.837 7712.24
10618.18 85.750 48.870 4127.40 4194.00 7477.88 N 2680.90 W 6007390.20 N 562924.39 E 4.814 7738.97
10662.83 86.250 46.430 4130.51 4197.11 7507.88 N 2647.99 W 6007420.49 N 562957.04 E 5.565 7764.94 ~.
10713.51 87.170 46.350 4133.42 4200.02 7542.78 N 2611.35 W 6007455.71 N 562993.37 E 1.822 7795.34
10756.67 87.850 46.770 4135.30 4201.90 7572.43 N 2580.04 W 6007485.63 N 563024.42 E 1.851 7821.14
10805.75 87.970 45.950 4137.09 4203.69 7606.28 N 2544.55 W 6007519.79 N 563059.61 E 1.687 7850.63
10849.54 87,900 45.250 4138.67 4205.27 7636.89 N, 2513.28 W 6007550.68 N 563090.61 E 1.605 7877.41
10898.97 86.980 43.630 4140.87 4207.47 7672.15 N 2478.71 W 6007586.24 N 563124.87 E 3.766 7908.40
10943.70 88.090 44.490 4142.80 4209.40 7704.26 N 2447.63 W 6007618.62 N 563155.66 E 3.138 7936.68
10993.66 88.710 45.670 4144.19 4210.79 7739.53 N 2412.27 W 6007654.20 N 563190.71 E 2.667 7967.59
11037.51 88.590 44.260 4145.22 4211.82 7770.54 N 2381.29 W 6007685.48 N 563221.42 E 3.226 7994.79
11087.51 88.220 43.010 4146.62 4213.22 7806.71 N 2346.80W 6007721.96 N 563255.59 E 2.606 8026.71
11131.04 88.400 42.280 4147.90 4214.50 7838.72 N 2317.33 W 6007754.22 N 563284.78 E 1.727 8055.07
11180.89 88.220 40.790 4149.37 4215.97 7876.02 N 2284.29 W 6007791.81 N 563317.49 E 3.009 8088.27
11224.37 88.340 40.180 4150.68 4217.28 7909.07 N 2256.07 W 6007825.11 N 563345.41 E 1.429 8117.82
11274.31 88.280 39.520 4152.15 4218.75 7947.40 N 2224.08 W 6007863.71 N 563377.06 E 1.326 8152.16
11317.78 86.120 41.640 4154.27 4220.87 7980.37 N 2195.84 W 6007896.93 N 563405.01 E 6.958 8181.62
11369.35 85.130 40.280 4158.21 4224.81 8019.20 N 2162.14 W 6007936.06 N 563438.38 E 3.256 8216.27
11411.00 84.700 41.070 4161.90 4228.50 8050.66 N 2135.10 W 6007967.76 N 563465.14 E 2.153 8244.37
11460.22 85.870 43.540 4165.94 4232.54 8086.93 N 2102.08 W 6008004.32 N 563497.83 E 5.537 8276.56
11505.01 88.210 45.140 4168.26 4234.86 8118.92 N 2070.82 W 6008036.58 N 563528.81 E 6.326 8304.69 "-'"
11554.72 88.950 45.910 4169.49 4236.09 8153.74 N 2035.37 W 6008071.71 N 563563.96 E 2.148 8335.15
11598.17 89.260 46.330 4170.17 4236.77 8183.85 N 2004.05 W 6008102.09 N 563595.01 E 1.201 8361.41
11647.83 89.630 45.620 4170.65 4237.25 8218.36 N 1968.35 W 6008136.92 N 563630.41 E 1.612 8391.54
11691.26 88.210 45.870 4171.47 4238.07 8248.66 N 1937.25 W 6008167.49 N 563661.24 E 3.320 8418.01
11740.14 87.600 44.660 4173.25 4239.85 8283.04 N 1902.55W 6008202.17 N 563695.64 E 2.771 8448.12
11784.44 88.280 44.740 4174.85 4241.45 8314.51 N 1871.41 W 6008233.91 N 563726.50 E 1.546 8475.76
11834.15 86.860 43.820 4176.95 4243.55 8350.07 N 1836.73 W 6008269.77 N 563760.86 E 3.403 8507.04
11877.98 87.040 44.190 4179.29 4245.89 8381.55 N 1806.33 W 6008301.52 N 563790.99 E 0.938 8534.77
11927.81 87.850 45.130 4181.51 4248.11 8416.96 N 1771.34 W 6008337.24 N 563825.66 E 2.489 8565.86
11971.10 88.650 45.770 4182.83 4249.43 8447.31 N 1740.50 W 6008367.86 N 563856.23 E 2.366 8592.43
12021,57 88~520 45.180 4184.08 4250.68 8482.69 N 1704.53 W 6008403.55 N 563891.89 E 1.197 8623.38
28 October, 2002 - 15:23 Page 3 of5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-29L 1 AfWD
Your Ref: API 500292311960
Job No. AKMW22160, Surveyed: 13 October, 2002
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
12064.92 88.950 44.470 4185.03 4251.63 8513.43 N 1673.98 W 6008434.56 N 563922.17 E 1.914 8650.36
12114.58 89.570 46.270 4185.67 4252.27 8548.31 N 1638.64 W 6008469.75 N 563957.20 E 3.833 8680.89
12158.64 89.450 45.850 4186.05 4252.65 . . 8578.88 N 1606.92 W 6008500.60 N 563988.65 E 0.991 8707.57
12209.14 89.750 44.990 4186.40 4253.00 8614.33 N 1570.95 W 6008536.36 N 564024.31 E 1.804 8738.59
12251.21 87.420 46.030 4187.44 4254.04 8643.80 N 1540.95 W 6008566.10 N 564054.05 E 6.065 8764.37
12298.54 86,300 46.460 4190.04 4256.64 8676.48 N 1506.81 W 6008599.08 N 564087.89 E 2.534 8792.86 -----/
12344.70 87.170 47.410 4192.66 4259.26 8707.95 N 1473.15 W 6008630.84 N 564121.28 E 2.788 8820.20
12391.47 87.110 48.060 4195.00 4261.60 8739.37 N 1438.58 W 6008662.56 N 564155.58 E 1.394 8847.38
12437.95 86.620 48.900 4197.54 4264.14 8770.13 N 1403.83 W 6008693.63 N 564190.05 E 2.090 8873.89
12486.36 87.540 50.260 4200.01 4266.61 8801.48 N 1367.02 W 6008725.30 N 564226.58 E 3.389 8900.74
12530.84 87.970 49.810 4201.75 4268.35 8830.02 N 1332.96 W 6008754.14 N 564260.39 E 1.399 8925.14
12580.39 88.590 52.150 4203.24 4269.84 8861.20 N 1294.48 W 6008785.66 N 564298.59 E 4.883 8951.63
12624.51 89.020 51.650 4204.16 4270.76 8888.42 N 1259.77 W 6008813.18 N 564333.07 E 1.495 8974.62
12672.92 89.450 51 .460 4204.80 4271.40 8918.52 N 1221.86 W 6008843.61 N 564370.71 E 0.971 9000.11
12717.39 89.320 50.150 4205.28 4271.88 8946.62 N 1187.40 W 6008872.01 N 564404.92 E 2.960 9024.01
12763.44 89.200 49.460 4205.87 4272.47 8976.34 N 1152.22 W 6008902.04 N 564439.83 E 1.521 9049.43
12810.84 89.630 50.990 4206.36 4272.96 9006.66 N 1115.80 W 6008932.68 N 564475.99 E 3.353 9075.31
12879.05 89.630 49.820 4206.80 4273.40 9050.13 N 1063.24 W 6008976.61 N 564528.17 E 1.715 9112.37
12950.00 89.630 49.820 4207.26 4273.86 9095.91 N 1009.03 W 6009022.86 N 564581.97 E 0.000 9151.53 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes. Zone 4.
~
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 353.320° (True).
Magnetic Declination at Surface is 25.734 O(29-Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 12950.000.,
The Bottom Hole Displacement is 9151.70f1., in the Direction of 353.670° (True).
28 October, 2002 - 15:23
Page 4 0'5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for MIlne PolntMPS - MPS-2£IL 1 MWD
Your Ref: API 500292311960
Job No. AKMW2216fJ, Surveyed: 13 October, 2002
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings . . Comment
(ft) (ft) (ft)
8792.09
8842.00
12950.00
4172.51
4174.71
4273.86
6027.48 N
6073.57 N
9095.91 N
3356.06 W
3375.08 W
1009.03 W
Tie On Point
Window Point
Project$d Survey
~.
Survey too/øroQram for MPS-29L 1 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
178.00
0.00 178.00
178.00 12950.00
178.00 AK-1 BP _HG(MPS-29 MWD)
4273.86 MWD Magnetic(MPS-29 MWD)
28 October, 2002 - 15:23
of5
DrillQuest 3.03.02.002
~L~IJ! (ûJ~ ~~~~æfA\
'\
AI..ASHA. OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Milne Point Unit MPS-29Ll
BP Exploration (Alaska), Inc.
Permit No: 202-196
Surface Location: 3270' NSL, 340' WEL, Sec. 12, TI2N, RI0E, UM
Bottomhole Location: 1899' NSL, 1419' WEL, Sec. 35, TI3N, RI0E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to redrill the above development well. .
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the. right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well MPU MPS 29, Permit No 202-195,
API 50-029-23119. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
~
Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DATED this.z¿i{day of September, 2002
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
1 a. Type of work 0 Drill II Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3270' NSL, 340' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4568' NSL, 3870' WEL, SEC. 01, T12N, R10E, UM (OA)
At total depth
1899' NSL, 1419' WEL, SEC. 35, T13N, R10E, UM {OA}
12. Distance to nearest property line 13. Distance to nearest well /
ADL 380109,1899' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 9100' MD Maximum Hole Angle
18. Casin~ Program Specifications
$Ize
Hole CasinQ Weight Grade Couolina
6-1/8" 4-1/2" 12.7# L-80 BTC
J' STATE OF ALASKA->
ALASKA L AND GAS CONSERVATION COMt\,..JSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned KBE= 68' Milne Point Unit I Schrader
6. Property Designation Bluff
ADL 025518
7. Unit or Property Name
Milne Point Unit
8. Well Number /'
MPS-29L 1 Number 2S100302630-277
9. Approximate spud dat~
61- L(cr0¿0T llll U. Þ'~. Amount $200,000.00
14. Number of acres in property 15. Proposed depth {MD and TVD}
2560 13024' MD I 4271' TVD
0 17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)}
94 Maximum surface 1692 psig, At total depth (TVD) 4181'/1880 psig
Setting Depth
T QP Botom Quantity of Cement
Lenath MD TVD MD TVD (include staQe data)
3924' 9100' .42ðtr 13024' 4271' Uncemented Slotted Liner
'fI1'
~
~~C;~ 1/2. s/o ~
J ¡r - 7/-4-:r-
11. Type Bond (See 20 AAC 25.025)
/
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
13023 feet
4331 feet
N/ A feet
NI A feet
Length
Plugs (measured)
Junk (measured)
Size
Cemented
MD
TVD
80' 20"
9389' 7-5/8"
3734' 6-1/8"
260 sx Arctic Set (Approx.)
45 sx PF 'L', 1540 sx Class 'G'
112'
9389'
112'
4191'
Uncemented Slotted Liner
t\3q¥~' %'
1'; ~~, '\\~:
4331'
Perforation depth: measured
NIA
true vertical
NIA
20. Attachments
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer NameINumber: Steve Campbel/, 564-4401 Prepared By NameINumber: Sondra Stewman, 564-4750
2L1S~:~:Y ~a~::~t the fOregOiò: :t7correct~~~e~;g~:k;, . Date q /1 b 10 d-
Permit Number API Number . /" ....4 Aß(>roval ~at~ See cover letter
.z 02. - /,9 b 50- 0 2 ~ - 2. 3 / / / - e::;; C-/ '1 \~ ~.l O~ for other reQuirements
Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Requireö 0 Yes SNo
Hydrogen Sulfide Measures 0 Yes B No Directional Survey Required EYes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T~s t- ß 0 P E -k t¡.pOû f~ { .,
:)KIGíNAL SIGNED BY by order of
0 Taylor Seamount Commissioner the commission
ORIGINAL
Approved By
Form 10-401 Rev. 12-01-85
Date q ô\(R 0;:(
Submit In Triplicate
-)
IWell Name: MPS-29 L1
Drill and Complete Plan Summary
Milne F ~)t MPS-29 Well Permit
I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "DB"
Surface Location: 2009' FNL, (3270 FSL), 340 FEL, (49391 FWL), SEC. 12, T12N, R10E
E=565670.94 N=5999936.18
7111 FNL, (4568' FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E
E=562082 N=6006484 2=4161' TVD
33801 FNL, (1899' FSL), 1419' FEL, (3860' FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 2=4271' TVD
7111 FNL, (45681 FSL), 3870' FEL, (14081 FWL), SEC. 01, T12N, R10E
E=562082 N=6006484 2=4189' TVD
33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 2=4250' TVD
33801 FNL, (18991 FSL), 1419' FEL, (38601 FWL), SEC. 35 T13N, R10E
E=564514 N=6009115 2=4331' TVD
I AFE Number: I I Riq: I Doyon 141 / 1
I Estimated Start Date: 1 SEP 29, 2002 1 I Operatinq days to complete: 113 1
I MD: 113024 1 I TVD: 14271 1 1 Max Inc: 194 1 I KOP: 191001' 1 KBE: 168 1
I Well Desiqn (conventional, slim hole, etc.): I Conventional Grass Roots¡:ML Producer I
1
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "OB"
Target Location:
BHL "OB" Well TD
TOTAL DEPTH
I Objective: I Schrader DB Sand
Mud Program:
9-7/8" Surface Hole Mud Properties:
Density (ppg) Funnel visc VP
HTHP
Spud - LSND Freshwater Mud
pH API Filtrate LG
Solids
< 6.5
8.6 - 9.20
75 - 150
25 - 60
N/A
<8
9.0-9.5
KCL-CaC03 Flow Pro
pH API Filtrate LG
Sol ids
<12
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel visc VP HTHP
8.6 - 9.20 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
1
)
Milne Pr .') MPS-29 Well Permit
Cement Program:
Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing
B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
aSlS
permafrost
Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location.
Total Cement Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50
Spacer
ppg
Lead 45 sx 10.7lb/gal Class L - 4.15 cuft/sx (cement to surface)
1540-sx 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 3496'
Tail
~?
Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton
Evaluation Program:
97/8" Hole Section:
Open Hole:
Cased Hole:
6-1/8" Hole section:
Open Hole:
MWD/GRlRES IFRlCASANDRA
N/a
MWD/GRlRES ABI/IFRlCASANDRA
Formation Markers:
Formation Tops MDrkb TVDßb . Estimated EMW
(ft) (ft) Pore Pressure (pSI) (lb/gal)*
Base Permafrost 1,812 1,706 767 8.65
Top Ugnu 3512 1579 8.65
TopUgnuM NA
Bottom U gnu NA
NA NA 3969 1785 8.65
NB NA 3996 1797 8.65
NC NA 4026 1810 8.65
NE NA 4043 1818 8.65 /(...-
NF NA 4091 1840 8.65 q.
Top OA NA 4122 1854 8.65
Base OA NA 4147 1865 8.65
Top OB NA 4181 1880 8.65
TD 13023 4312 1939 8.65
2
,)
CasingITubing Program:
Milne P ..')1 MPS-29 Well Permit
Hole Csg /
Size Tbg O.D.
42-in 20-in* 92#
9.875-in 7.625-in 29.7#
6. 125-in 4.5-in 12.7#
6. 125-in 4.5-in 12.7#
*The 20" casing is insulated
Wt/Ft Grade
Top
MD / TVDrkb
H -40 Welded 80- ft 0
L-80 BTC 9389-ft O-ft
L-80 BTC c¿o.324-ft 9100-ft / 4,208-ft
L-80 I BTC 3,734-ft 9289-ft / 4,227-ft
?>3q~ y J
Conn
Length
Bottom
MD / TVDrkb
112-ft / 112-ft
9389-ft /4191-ft
13024-ft / 4271-ft
13023-ft / 4,331-ft
Recommended Bit Program:
BHA
1
2
3
Hole
Size
9.875-in
9.875-in
6. 125-in
Depth (MD)
Bit Type
Nozzle/Flow
rate
3-15 & 1-10
TBD
3 -12
0 - 2,000-ft
2,000 - 9389-ft
9100-ft - TD
Hughes MXC-1
TBD
Security FM2643
Well Control:
. Production hole will be drilled with a diverter.
Surface Interval
. Maximum anticipated BHP:
. Maximum surface pressure:
1880 p, @ 4181' TVDrkb - Top of "OB"
1692 psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
Diverter will be function tested. BOP's:Test annular 250 psi low
and 2500 psi high, and rams to 250 psi low and 4,000 psi high."/
N/A
9.2 ppg NaCI / 6.8 ppg Diesel
. Planned BOP test pressure:
.
. Kick tolerance:
. Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
. Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
3
)
Milne ~ "J MPS-29 Well Permit
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
. Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
. It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
Pad Data Sheet
. Please Read the S-Pad Data Sheet thoroughly.
Breathing
.N/A
Hydrocarbons
. Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
. NA
Hydrogen Sulfide
. MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
. MPS-29 has no anti-collision issues.
4
')
DRILL & COMPLETION PROCEDURE
Milne P,' ''1 MPS-29 Well Permit
Pre- Rig Operations
1. The 20" insulated conductor is installed
Procedure
/'
1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe
2. Drill 9-7/8" surface hole as per directional plan.
3. Condition mud prior to 7 5/8" casing run. POOH
4. Run and cement 7 5/8" casing from TD to surface.
5. ND Diverter
6. Install FMC 11" 5m horizontal wellhead
7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250
low and 4000 psi high
8. Drill 6-1/8" OB horizontal production hole as per directional plan.
9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing.
10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at top of the OA interval.
b. Shear off and mill window thru 7-5/8" casing.
11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
12. MU whipstock retrieving tool and pull whipstock ~
13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing
14. POOH
15. Till and displace out drilling mud with 9.2 ppg N aCI /"
16. POOH
17. Run in hole with 4-1/2" jet pump completion as per schematic
18. Land tubing hanger and test
19. Set BPV
20. ND BOP
21. Install and test tree
22. Pull BPV
23. Drop ball and set production packer
24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi ./
25. Freeze protect thru GLM
26. Install BPV and secure the well
27. RD/MO
5
TREE: Cameron 4-1/16" 5M f-JHOf-JOSI=LJ COMPLI= liON
. WELLHEAD: FMCGen 6 11",5M~\IIPS-?9 P~-?C...."1 1
I Tubing Mead: 11" x 4-1/2",". .J¡ . . -, '" J-
FMC Tubing Hanger ~
112' 20" 92 Ibltt, H-40 Welded Ý
Insulated
Diesel Freeze protect to
750' MD
~ ~
~.;:::: , ~ 9-7/8" Hole
"-
\ 'I, - -----
, '-- 08 Horizontal 6-1/8" hole
-------
9.2 KCI with corrosion
inhibitor as packer fluid
Jet Pump Installed in
Sliding Sleeve Post rig!
III
, ,,~::,:.' .. .
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing 10: 6.875
Coupling 00: 8.5"
Burst: 6,890 psi
Collapse: 4,790 psi
j:~~*.:
Window in 7" casing @ 9,100' MO
Well Inclination @ Window = 87 Degrees
7.625" Casing Shoe @ 9,389' MD
Well Inclination @ Shoe = 90 Degrees
PBTD
TD
DATE
130 Sep 02
REV. BY
SKC
COMMENTS
Level 3 Multi-Lateral, 4-112" Jet Pump Completion
KB. ELEV =66.5'
Cellar Box ELEV = 38.0'
... 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD,
RP shear valve open position
4-1/2", 12.6 Ib/ft, L-80, IBT-M
Coupling 00: 5.2"
OriWIO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
~
"" .
BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down
to lower sensor)
Halliburtion Dura Sleeve XD WIX Nipple (3.813" ID)
Phoenix Pressure Gauge (2.840" ID)
. i~W.~/~
7-5/8" x 4-1/2" S-3 Packer
I Set @ 8,950' MD, 4150' TVD I
3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod
Wireline Entry Guide
\~
Multi-Lateral Junction 9,100'
6-1/8" OA Lateral TD 13,024' /'
6-1/8" OB Lateral TD 13,023'
........-----
- -
- -
t
;\
t
*
t
- -
OA Horizontal 6-1/8" hole
r-- -- - -
- -
- -
- -
4-1/2" Slotted Liner WlHookwall hanger
- -
- -
4-1/2" Slotted Liner & Hanger
Milne Point Unit
WI=I I : MPS-?9
API NO:
BP Exploratíon (Alaska)
~ BPXA
.t...u.,.., ,,~~~~ Milne Point Unit
Proposal Data for MPS-29L 1 WP 3.0
Vertlclll Origin :
tbrlmrtll Origin :
Mel8U'emert lk1Its :
North Reference :
We'
We.
ft
True North
Dogleg -ty : Degrees per 100 feet (US)
Vertlclll Section AzlnUh : 353.520°
Vertlclll Section Description: We. 9000-
Vertlclll Section Origin: 0.00 N,O.OO E
MNeur«I IncI. AmI. Vertical Northlng8 E88tlngs Verticil ~
Depth Depth Section
9100.00 87.803 348.430 4180.81 6292.95 N 3502.35 W 6648.oJ
9120.00 89,882 349.629 4181.22 6312.58 N 3506.16 W 6667.94 1'.-"1
9160.47 94.728 349.948 4119.59 6352.37 N 3513.33 W 6708.29 I' ¡III
9222.49 94.728 349.948 4174A8 6413.22 N 3524.1 I W 67~.97
9389.44 94.1XX1 5.1XX1 4161.70 6579.04 N 3531A2 W 6935.56
9955.85 88.040 55.580 4150.91 7051.99 N 3254.88 W 7374.28
10087.45 88.040 55.580 41SSA1 7126.34 N 3146.39 W 7435.90
10117.22 87.1XX1 SS.IXXI 4156.70 7143.27 N 3121.94 W 7449.97 ,.~,N
10148.24 85.971 54.30S 4158.60 7161.18 N 3096.69 W 7464.91 .¡ ....
10559.77 85.971 54.30S 4187.51 7400.71 N 2763.30 W 7665.28 IJ"'. ~ 8000 -
1072\.94 87.S40 48.1XX1 4196.70 7502.22 N 2637.27 W 775\.92 .1'111
10754.16 87.537 46.710 4198.os 7524.02 N 2613.59 W 7770.91 .1'1'1
11263.37 87.537 46.710 4219.97 7872.86 N 2243.28 W 8075.73 ....,.
11307.38 87.960 4S.1XX1 4221.70 7903A9 N 221 \.72 W 8102.61 .II'" (f)
1132\.21 87.961 44.447 4222.1 9 7913.31 N 2202.00 W 811 \.26 J 1111 C)
11905.85 87.961 44.447 4242.99 833OA2 N 1792.87 W 8479.54 11."1 C
12028.02 88.562 39.595 4246.70 8421.11 N 1111.15 W 8S6()A3 J I1II :ë
13024.28 88.562 39.595 4271.70 9188.56 N 1076.38 W 9251.33 l,ilTI 1::
0
Z
7000-
8
0
0
II
s:.
.~
1R 6000 -
~
(f)
Scale: 1 inch = 1000ft
-3000
I
Milne Point MPS DrillQuest-
MPS-29
Eastings (Well)
-2000
I
-1000
I
0
I
MPS-2911 16
4271.701VO.
9168.56N, l°il76_38W~,
4263. ~.
~
..,.~
=l1d Dir, Start Sail @ 88.562° : 12028.02ftMD~4246.70ftTVD
egm Dir @ 4.000°/1000: 11905.85ft MD, 42..2.99ft TVD
-Total Depth: 13024.28ftMD,4271.7OOTVD
~
MPS.29L 1 14
4221,70 TVO.
7903.49 N. 2211,72
~Ribi~~rt4~ð8b~1ßbH?'; M1:i\t~B~P~~A9f\Jd'D
nd Dir, Start Sail @ 87.53r: 10754.16ftMD,4198.08ftTVD
egin Dir @ 4.000°/1000: 10559.77ft MD. 4187.51ft TVD
End Dir, Start Sail @ 85.971 ° : 10148.24ftMD,4158.60ftTVD
~in Dir @ 4.0ooo/100ft: 1oo87.45ft MD, 4155.41ft TVD
nd Dir, Start Sail @ 88.040°: 9955.85ftMD,4150.91ftTVD
41483
MPS-29L 1 11
4161.70 TVD.
.6579,04 N, 3531.42 W
ç::Begin Dir @ 9.oo00/1ooft: 9222.49ft MD, 4174.48ftTVD
4180J;:.-end Dir, Start Sail @ 94.672° : 9160.ooftMD,4179.63ftTVD
KOP: Start Dir @ 12.0000/1ooft: 9100.ooftMD,4180.81ftTVD
\
bp
A;\~Oß~~~Q ~Q
, \ç),,.\Jb.4\19'~~ 4\~,g\I\\\~'
,,0 \z,~.~rJf¡/tJß,~<g;;::~<ft}.\\~~~~~~~ ~ \J
'i-rJ~:~~:~:::~~~;..~~~~~,~\~~~~\~~~tï<t~~\J
,.., ".i.J I ~ _M. /¡¡:!~~J.', ~ ~ : 4,~~'o ~ ~~~l~~;¡,~9fl:<O,:\Z(}'/ß'C
"" ","" /',,/"é.f'. ~ "~~ U!' 0 4,""'51"\ 0
"'":,, ~.." w ,..&0......, ~øll>"~øI \)\" ~ Total Depth '
MPS-29L1 12 ~9S'2911 m ~ ImJ» .'$fJO.rKI j /-1, IIJS.29L1 13024.2attMD
"",,"NO' ']ONO -',(,. ~"'.. WP10/4271
m,." ~ ,;...:~" ~ ,row w MPS."" H "'" - ~.. .70ffTVD
I ;::;;: NO, ",,:'ii'i-:ri F'-"" :':,';~ '"
7500 I . ~ ""." w ,"'." N, ""," W NO, ""." ~ ""." w
8250
(j)
s:
- 3750-
c
ã.
Q)g
::)10
-,...
~II
e-g
Q).-
>--
iD
~ 4500 -
I
6750
Scale: 1 Inch .. 750ft
~oi-\
)
I I
9000 9750
Section Azimuth: 353.5200 (frue North)
Vertical Section (Well)
DrlllQuest 2.00.09.008
BP EXPLORA TION
.~'
PXA
'oint MPS, Slot MPS-29
PS-29L 1 WP 3.0
Revised: 10 September, 2002
PROPOSAL REPORT
10 September, 2002
\
~}
Surface Coordinates: 5999936.26 H, 565671.13 E (70024' 36.9767" H, 149027' 54.9342" W)
Surface Coordinates relative to Project H Reference: 999936.26 H, 65671.13 E (Grid)
Surface Coordinates relative to Structure: 32.81 S, 674.18 W (True)
Kelly Bushing: 66. 70ft above Mean Sea Level
=4.cJ EI'rwy-!EII.JI1
aJIt.J~lw:tRy, ..'.,."',"',c:"U
A """"~Ot#cII...r
Proposal Ref: pro 10 182
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
MPS-29 6.0
0.00 0.000 0.000 -66.70 0.00
27.60 0.000 0.000 -39.10 27.60
100.00 0.000 0.000 33.30 100.00
200.00 0.000 0.000 133.30 200.00
300.00 0.000 0.000 233.30 300.00
400.00 1.500 326.000
433.33 2.000 326.000
500.00 3.833 326.000
600.00 6.583 326.000
700.00 9.333 326.000
800.00 12.083 326.000
900.00 14.833 326.0
1000.00 17.583 32
1100.00 20.333 32
1200.00 23 .083.'/~326:'
.~ .;:-ii'~' ~~~~t;: ".' ,,';:-":;'
~;1~.8åa~1,,~"326.00Ó.,I" , 1201.78 1268.48
\¿æi5.8~C~~ 326.000 1290.71 1357.41
.~6~090 '~}:- 326.000 1335.64 1402.34
~~~.30 .8'48 326.000 1377.44 1444.14
~.598 326.000 1462.50 1529.20
1700.00 34.348 326.000 1545.91 1612.61
1800.00 36.098 326.000 1627.60 1694.30
1900.00 37.848 326.000 1707.49 1774.19
1908.66 38.000 326.000 1714.32 1781.02
2000.00 38.000 326.000 1786.30 1853.00
2036.81 38.000 326.000 1815.30 1882.00
2100.00 40.502 326.572 1864.23 1930.93
2200.00 44.466 327.366 1937.96 2004.66
2300.00 48.435 328.056 2006.85 2073.55
2400.00 52.408 328.666 2070.55 2137.25
10 September, 2002 - 16:15
Sperry-Sun Drilling Services
Proposal Report for MPS-29
Revised: 10 September, 2002
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
O.OON
O.OON
O.OON
O.OON
O.OON
39.15 N
58.44 N
81.58 N
108.51 N
139.17 N
173.49 N
211.39N
23229 N
252.64 N
296.23 N
341.96 N
389.77 N
439.63 N
444.05 N
490.67 N
509.45 N
542.71 N
599.33 N
660.60 N
726.21 N
BPXA
Milne Point MPS
-'ett.[f'!1~~~:,~,ij. if;;"
Global Coordinat.~ "'~~~:i DØgle'g:~
N°7~:ngS \;~i:~y¡{ft~)c
Comment
t;S;_1~111~'[~ . 565671.13 E 0.00
565671.13 E 0.000 0.00
565671.13 E 0.000 0.00
565671.13 E 0.000 0.00
565671.13 E 0.000 0.00
..73W 5999937.34 N 565670.39 E 1.500 1.16
1.30W 5999938.18 N 565669.81 E 1.500 2.06
3.20W 5999940.97 N 565667.89 E 2.750 5.07
8.27W 5999948.45 N 565662.75 E 2.750 13.12
16.02 W 5999959.86 N 565654.91 E 2.750 25.40
26.40 W 5999975.17 N 565644.38 E 2.750 41.88
39.42 W 5999994.35 N 565631.20 E 2.750 62.51
55.03 W 6000017.35 N 565615.39 E 2.750 87.27
73.19 W 6000044.12 N 565596.99 E 2.750 116.08
93.87 W 6000074.60 N 565576.04 E 2.750 148.88
117.02W 6000108.72 N 565552.59 E 2.750 185.59
142.59 W 6000146.39 N 565526.69 E 2.750 226.14
156.68 W 6000167.16 N 565512.41 E 2.750 248.49
170.41 W 6000187.40 N 565498.50 E 1.750 270.26
199.81 W 6000230.73 N 565468.72 E 1.750 316.89
230.65 W 6000276.18 N 565437.48 E 1.750 365.80
262.90 W 6000323.71 N 565404.81 E 1.750 416.95
296.54 W 6000373.27 N 565370.74 E 1 .750 470.29
299.51 W 6000377.65 N 565367.72 E 1.750 475.01
330.96 W 6000424.00 N 565335.87 E 0.000 524.88
343.63 W 6000442.67 N 565323.03 E 0.000 544.98
365.82 W 6000475.73 N 565300.56 E 4.000 580.53
402.61 W 6000532.03 N 565263.27 E 4.000 640.94
441.31 W 6000592.95 N 565224.03 E 4.000 706.18
481.72 W 6000658.20 N 565183.05 E 4.000 775.93
Page2of9 DrRlQuest 2.00.09.008
~$
.[ -
'-'-- (
Sperry-Sun Drilling Services
Proposal Report for MPS-29
Revised: 10 September, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit "tt 'j:J1~t!~ 'l*~~\ Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinat~ "":' ö<i9le~¥t
Depth Incl. Azlm. Depth Depth Northings Eastlngs Northings . '""::;:'i 'q~;,.. J~~te ':",' Comment
(ft) (ft) (ft) (ft) (ft) (ft) '(ft)::;¿".. .'t{;)i~:(fftOOft)
2500.00 56.383 329.213 2128.76 2195.46 795.85 N 523.65 W 600072 ,J¡ . ,'P£\ "~;':.. 4.000 849.86
2600.00 60.361 329.713 2181.19 2247.89 869.17 N 566.90 W 600080Õ:4 'J.;Øf~ '9~~'1 E 4.000 927.60
2700.00 64.340 330.174 2227.58 2294.28 945.83 N 611.25~ ,00876.68'N 051.59E 4.000 1008.77
2800.00 68.321 330.606 2267.72 2334.42 1025.44 N 656.49' ,~è-. 6ðø0955.~{~. 565005.65 E 4.000 1092.98
2859.24 70.680 330.850 2288.46 2355.16 1073.84 N .68~;¡;¿ Wf~':::: ~ 564978.10 E 4.000 1144.13
2900.00 70.680 330.850 2301.95 564959.07 E 0.000 1179.63
3000.00 70.680 330.850 2335.03 ." 6001119.49 N 564912.38 E 0.000 1266.70
3100.00 70.680 330.850 2368.12 6001201.50 N 564865.69 E 0.000 1353.78
3200.00 70.680 330.850 2401.20 6001283.51 N 564819.00 E 0.000 1440.86
3300.00 70.680 330.850 2434.29 6001365.51 N 564772.31 E 0.000 1527.94
3400.00 70.680 932.19 W 6001447.52 N 564725.62 E 0.000 1615.01
3500.00 70.680 978.15 W 6001529.53 N 564678.93 E 0.000 1702.09
3600.00 70.680 1024.12 W 6001611.54 N 564632.24 E 0.000 1789.17
3700.00 70.680 1070.09 W 6001693.55 N 564585.55 E 0.000 1876.25
3800.00 70.680 1116.05 W 6001775.56 N 564538.86 E 0.000 1963.33
3900.00 70.680 .7 1931.60 N 1162.02W 6001857.57 N 564492.17 E 0.000 2050.40
4000.00 70. 65.88 2014.02 N 1207.99 W 6001939.58 N 564445.48 E 0.000 2137.48
4100.00 ;JO.,.<, ,':- . . . . 698.96 2096.43 N 1253.95 W 6002021.59 N 564398.79 E 0.000 2224.56
4200.00 ?t.m<.6ag;~f'a30.850'>" 2732.05 2178.85 N 1299.92 W 6002103.60 N 564352.10 E 0.000 2311.64
43 ',i,:70,.-688!~\ 330.850 2765.13 2261.27 N 1345.89 W 6002185.61 N 564305.41 E 0.000 2398.71
!~~l .~)~ ¡:'~~.L-
i~~6S0 ~. 330.850 2798.22 2864.92 2343.68 N 1391.85 W 6002267.62 N 564258.72 E 0.000 2485.79
" '. . .680 330.850 2831.30 2898.00 2426.10 N 1437.82 W 6002349.62 N 564212.03 E 0.000 2572.87
70.680 330.850 2864.38 2931.08 2508.52 N 1483.79 W 6002431.63 N 564165.34 E 0.000 2659.95
70.680 330.850 2897.47 2964.17 2590.93 N 1529.75 W 6002513.64 N 564118.65 E 0.000 2747.02
70.680 330.850 2930.55 2997.25 2673.35 N 1575.72 W 6002595.65 N 564071.96 E 0.000 2834.10
4900.00 70.680 330.850 2963.64 3030.34 2755.77 N 1621.69 W 6002677.66 N 564025.28 E 0.000 2921.18
5000.00 70.680 330.850 2996.72 3063.42 2838.18 N 1667.65 W 6002759.67 N 563978.59 E 0.000 3008.26
5100.00 70.680 330.850 3029.81 3096.51 2920.60 N 1713.62 W 6002841.68 N 563931.90 E 0.000 3095.33
5200.00 70.680 330.850 3062.89 3129.59 3003.02 N 1759.59 W 6002923.69 N 563885.21 E 0.000 3182.41
5300.00 70.680 330.850 3095.97 3162.67 3085.43 N 1805.55 W 6003005.70 N 563838.52 E 0.000 3269.49
~\
)
,-,/ ¡
10 September, 2002 - 16:15
Page 3 of 9
DrR/Quest 2.00.09.008
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured
Depth
(ft)
Incl.
Azim.
5400.00 70.680 330.850
5500.00 70.680 330.850
5600.00 70.680 330.850
5700.00 70.680 330.850
5800.00 70.680 330.850
5900.00 70.680 330.850
6000.00 70.680 330.850
6100.00 70.680 330.850
6200.00 70.680 330.850
6300.00 70.680 330.850
6400.00 70.680
6500.00 70.680
6600.00 70.680
6700.00 70.680
6800.00 70.680
6900.00
7000.00
7100.00
7200.00
73 0
7900.00 70.680 330.850
8000.00 70.680 330.850
8061.86 70.680 330.850
8061.97 70.680 330.850
8100.00 72.192 331.031
10 September, 2002. 16:15
Sub-Sea
Depth
(ft)
3129.06
3162.14
3195.23
3228.31
3261.40
3294.48
3327.57
3360.65
3393.73
3426.82
3790.75
3823.83
3856.92
3890.00
3923.08
3956.17
3989.25
4009.72
4009.76
4021.86
Vertical
Depth
(ft)
3195.76
3228.84
3261.93
3295.01
3328.10
3857.45
3890.53
3923.62
3956.70
3989.78
4022.87
4055.95
4076.42
4076.46
4088.56
Sperry-Sun Drilling Services
Proposal Report for MPS.29
Revised: 10 September, 2002
Local Coordinates
Northings Eastings
(ft) (ft)
3167.85 N
3250.27 N
3332.68 N
3415.10 N
3497.52 N
4404.10 N
4486.51 N
4568.93 N
4651.35 N
4733.76 N
4816.18 N
4898.60 N
4981.01 N
5063.43 N
5145.85 N
5228.26 N
5310.68 N
5361.66 N
5361.75 N
5393.27 N
2311.19 W
2357.15 W
2403.12 W
2449.09 W
2495.05 W
2541.02 W
2586.99 W
2632.95 W
2678.92 W
2724.89 W
2770.85 W
2816.82 W
2862.79 W
2908.75 W
2954.72 W
3000.69 W
3046.65 W
3075.09 W
3075.14 W
3092.65 W
Page 4 of9
Nor~f~~ coordi~r~...!.,~~'
Ä~" -.
6003087c-~71'N' 56, ;, ,,~'E 0.000
600~;~~:;;.~' :} - ;I~:~:~ ~ ~:~~~
3333. 563651.76 E 0.000
3415.74 N 563605.07 E 0.000
03497.75 N
6003579.76 N
6003661.77 N
6003743.78 N
6003825.79 N
6003907.80 N
6003989.81 N
6004071.82 N
6004153.83 N
6004235.84 N
6004317.85 N
6004399.85 N
6004481.86 N
6004563.87 N
6004645.88 N
6004727.89 N
6004809.90 N
6004891.91 N
6004973.92 N
6005055.93 N
6005137.94 N
6005219.95 N
6005270.68 N
6005270.77 N
6005302.12 N
563558.38 E
563511.69 E
563465.00 E
563418.31 E
563371.62 E
563324.93 E
563278.24 E
563231.55 E
563184.86 E
563138.17 E
563091.48 E
563044.79 E
562998.10 E
562951.41 E
562904.72 E
562858.04 E
562811.35 E
562764.66 E
562717.97 E
562671.28 E
562624.59 E
562577.90 E
562549.02 E
562548.96 E
562531.18 E
Vertical
Section
Comment
3356.57
3443.65
3530.72
3617.80
3704.88
0.000 3791.96
0.000 3879.03
0.000 3966.11
0.000 4053.19
0.000 4140.27
0.000 4227.34
0.000 4314.42
0.000 4401.50
0.000 4488.58
0.000 4575.65
0.000 4662.73
0.000 4749.81
0.000 4836.89
0.000 4923.96
0.000 5011.04
0.000 5098.12
0.000 5185.20
0.000 5272.28
0.000 5359.35
0.000 5446.43
0.000 5533.51
0.000 5620.59
0.000 5674.45
0.000 5674.55
4.000 5707.83
BPXA
Milne Point MPS
~i
,-,"
DrlllQuest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MPS-29
Revised: 10 September, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azlm. Depth Depth Northings Eastlngs Comment
(ft) (ft) (ft) (ft) (ft)
8200.00 76.167 331.493 4049.12 4115.82 5477.61 N 3138.90 W 60053 5796.86
8300.00 80.144 331.940 4069.64 4136.34 5563.78 N 3185.26 W 60054 5887.71
8400.00 84.121 332.375 4083.33 4150.03 5651.36 N 3231.51 W;.~,+(:6905558.9 5979.95
8489.48 87.680 332.760 4089.72 4156.42 5730.56 N 3272.62 W ~ Gp05637. 6063.28 ~}
8500.00 87.680 332.760 4090.15 4156.85 5739.90 N 327> W--, 6005647.12 N 6073.11
8600.00 87.680 332.760 4094.20 5828.74 N 005735.56 N 562296.84 E 0.000 6166.54
8700.00 87.680 332.760 4098.24 5917.58 N 6005823.99 N 562250.32 E 0.000 6259.97
8708.48 87.680 332.760 4098.59 5..11 N 6005831.49 N 562246.38 E 0.000 6267.90
8800.00 87.694 336.423 4102.28 6001:070 N 6005913.72 N 562206.43 E 3.999 6354.38
8900.00 87.719 340.425 4106.29 ~1ciÓ.60 N 6006006.30 N 562168.87 E 3.999 6450.84
9000.00 87.756 344.428 3478.91 W 6006101.27 N 562137.87 E 3.999 6548.87
9100.00 87.803 348.430 3502.35 W 6006198.17 N 562113.58 E 3.999 6648.01 KOP : Start Dir @ 12.oo00/100ft:
9100.00ftMD,4180.81 ftTVD
6312.58 N 3506.16 W 6006217.77 N 562109.60 E 12.000 6667.94
6351.90 N 3513.24 W 6006257.03 N 562102.17 E 12.000 6707.82 End Dir, Start Sail @ 94.672° :
9160.00ftMD,4179.63ftTVD
4112.89 4179.59 6352.37 N 3513.33 W 6006257.49 N 562102.08 E 12.000 6708.29
4109.63 4176.33 6391.16 N 3520.20 W 600629622 N 562094.87 E 0.000 6747.60
4107.78 4174.48 6413.22 N 3524.11 W 6006318.25 N 562090.76 E 0.000 6769.97 Begin Dir @ 9.0000/10Oft: 9222.4Qft
MD,4174.48ftTVD ~J
94.428 356.940 4101.58 4168.28 6489.93 N 3532.93 W 6006394.88 N 562081.21 E 9.000 6847.19
94.000 5.000 4095.00 4161.70 6579.04 N 3531.42 W 6006484.00 N 562082.00 E 9.000 6935.56 Target - MPS-29L 1 T1
93.904 5.946 4094.27 4160.97 6589.53 N 3530.41 W 6006494.50 N 562082.91 E 8.986 6945.86
92.942 14.897 4088.29 4154.99 6687.60 N 3512.37 W 6006592.72 N 562100.09 E 8.986 7041.27
91 .909 23.832 4084.05 4150.75 6781.76 N 3479.28 W 6006687.17 N 562132.36 E 8.986 7131.10
9700.00 90.830 32.755 4081.65 4148.35 6869.70 N 3431.94 W 6006775.52 N 562178.92 E 8.986 7213.13
9800.00 89.730 41.674 4081.16 4147.86 6949.26 N 3371.52 W 6006855.60 N 562238.64 E 8.986 7285.36
9900.00 88.638 50.595 4082.59 414929 7018.48 N 3299.50 W 6006925.45 N 562310.04 E 8.986 7346.01
9955.85 88.040 55.580 4084.21 4150.91 7051.99 N 3254.88 W 6006959.36 N 562354.37 E 8.986 7374.28 End Dir, Start Sail @ 88.040° :
9955.85ftMD,4150.91 ftTVD
10000.00 88.040 55.580 4085.72 4152.42 7076.94 N 3218.48 W 6006984.62 N 562390.55 E 0.000 7394.95
10 September, 2002 - 16:15
Page50f9
DrR/Quest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MPS.29
Revised: 10 September, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth Comment
(ft) (ft) (ft)
10087.45 88.040 55.580 4088.71 4155.41 7126.34 N 7435.90 Begin Dir @ 4.0000/100ft: 10087.4511
MD, 4155.41ftTVD
10100.00 87.602 55.336 4089.19 4155.89 7133.45 N 3.999 7441.80
10117.22 87.000 55.000 4090.00 4156.70 7143.27 N 3.999 7449.97 Target - MPS-29L 1 T2 ~,ì
10148.24 85.971 54.305 4091.90 4158.60 7161.18 N 4.000 7464.91 End Dir, Start Sail @ 85.971 ° :
1 0148.24ftMD ,4158.60ftTVD
10200.00 85.971 54.305 4095.54 4162.24 562553.26 E 0.000 7490.12
10300.00 85.971 54.305 4102.56 562633.76 E 0.000 7538.81
10400.00 85.971 54.305 4109.59 562714.26 E 0.000 7587.49
10500.00 85.971 54.305 4116.61 562794.76 E 0.000 7636.18
10559.77 85.971 54.305 4120.81 562842.87 E 0.000 7665.28 Begin Dir @ 4.0000/100ft: 10559.7711
MD, 4187.51ftTVD
10600.00 86.357 52.739 2731.02 W 6007336.53 N 562874.93 E 4.000 7685.35
10700.00 87.326 7487.67 N 2653.66 W 6007400.31 N 562951.73 E 4.000 7739.32
10721.94 87.540 7502.22 N 2637.27 W 6007415.00 N 562968.00 E 4.000 7751.92 Target - MPS-29L 1 T3
10754.16 87.537 7524.02 N 2613.59 W 6007437.01 N 562991.48 E 4.000 7770.91 End Dir, Start Sail @ 87.537° :
1 0754.16ftMD,4198.08ftTVD
4200.05 7555.43 N 2580.25 W 6007468.71 N 563024.54 E 0.000 7798.36
4204.35 7623.93 N 2507.53 W 6007537.85 N 563096.66 E 0.000 7858.22
4141.95 4208.65 7692.44 N 2434.81 W 6007606.99 N 563168.78 E 0.000 7918.08
4146.25 4212.95 7760.94 N 2362.09 W 6007676.14 N 563240.89 E 0.000 7977.94
4150.55 4217.25 7829.45 N 2289.37 W 6007745.28 N 563313.01 E 0.000 8037.80
4153.27 4219.97 7872.86 N 2243.28 W 6007789.09 N 563358.71 E 0.000 8075.73 ~/l
4154.73 4221 .43 7898.29 N 2216.95 W 6007814.75 N 563384.81 E 4.000 8098.02
11307.38 87.960 45.000 4155.00 4221. 70 7903.49 N 2211.72 W 6007820.00 N 563390.00 E 4.000 8102.61 Begin Dir @ 4.0000/100ft: 11307.3811
MD, 4221.70ftTVD
Target - MPS-29L 1 T4
11321.21 87.961 44.447 4155.49 4222.19 7913.31 N 2202.00 W 6007829.90 N 563399.64 E 4.000 8111.26 End Dir, Start Sail @ 87.961° :
11321.21 ftMD,4222.19ftTVD
11400.00 87.961 44.447 4158.30 4225.00 7969.52 N 2146.86 W 6007886.60 N 563454.28 E 0.000 8160.89
11500.00 87.961 44.447 4161.85 4228.55 8040.87 N 2076.88 W 6007958.55 N 563523.63 E 0.000 8223.89
11600.00 87.961 44.447 4165.41 4232.11 8112.21 N 2006.90 W 6008030.51 N 563592.98 E 0.000 8286.88
10 September, 2002. 16:15
Page6of9
DrH/Quest 2.00.09.008
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azlm. Depth Depth
(It) (It) (It)
11700.00 87.961 44.447 4168.97 4235.67
11800.00 87.961 44.447 4172.53 4239.23
11900.00 87.961 44.447 4176.08 4242.78
11905.85 87.961 44.447 4176.29 4242.99
12000.00 88.423 40.707 4179.26 4245.96
12028.02 88.562 39.595 4180.00 4246.70
12100.00 88.562 39.595
12200.00 88.562 39.595
12300.00 88.562 39.595
12400.00 88.562 39.595
12500.00
12600.00
12700.00
12800.00
12900.00
4271.09
4271.70
Sperry-Sun Drilling Services
Proposal Report for MPS-29
Revised: 10 September, 2002
BPXA
Milne Point MPS
AGT.ftt\~~~;'h~
Global Coordlnat~ "'~{\ Døgle 'f1,.
No~~:ngs '~'~...l;.f~\~tç'Jr';:'~
Á~~' ~.'
1936.92 W 6008102AtÑ; é2~'t 0.000 8349.87
1866.94 W 6008174A3.N:~:.i"" iJrM E 0.000 8412.86
1796.96 W .08246.39 N '~' 5 801.03 E 0.000 8475.85
1792.ßr 8250. 563805.09 E 0.000 8479.54 Begin Dir @ 4.0000/100ft: 1190f .
,,1~ ~\W'~¡'6008320'43 N 563868,13 E 4,000 8541.19 MD,4242,99ftTVD -"
.' ' 6008342.00 N 563886.00 E 4.000 8560.43 End Dir, Start Sail @ 88.562° :
12028.02ftMD ,4246. 70ftTVD
Target - MPS-29L 1 T5
Local Coordinates
Northlngs Eastlngs
(It) (It)
~
1665.29 W 6008397.85 N 563931.37 E
1601.57 W 6008475.44 N 563994.41 E
1537.86 W 6008553.03 N 564057.45 E
1474.14 W 6008630.62 N 564120.48 E
8784.69 N 1410.43 W 600870821 N 564183.52 E
8861.72 N 1346.71 W 6008785.80 N 564246.55 E
8938.76 N 1283.00 W 6008863.39 N 564309.59 E
9015.79 N 1219.28 W 6008940.98 N 564372.62 E
9092.82 N 1155.57 W 6009018.57 N 564435.66 E
9169.86 N 1091.85 W 6009096.16 N 564498.69 E
9188.56 N 1076.38 W 6009115.00 N 564514.00 E
The Dogleg Severity Is In Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 353.520° (True).
8183.56 N
8254.90 N
8326.25 N
8330.42 N
8399.70 N
8421.11 N
Based upon Minimum Curvature type calculations, at a Measured Depth of 13024.28ft.,
The Bottom Hole Displacement is 9251.3911., in the Direction of 353.319° (True).
Comment
0.000 8610.35
0.000 8679.70
0.000 8749.05
0.000 8818.40
0.000 8887.74
0.000 8957.09
0.000 9026.44
0.000 9095.79
0.000 9165.14
0.000 9234.49
0.000 9251.33 Total Depth:
13024.28ftMD,4271.70ftTVD
Target - MPS-29L 1 T6
ì
. ~
, J
~,
All data is in t (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
10 September, 2002 -16:15
Page 70f9
Drll/Quest 2.00.09.008
Sperry-Sun Drilling Services
Proposal Report for MPS-29
Revised: 10 September, 2002
Station Coordinates
TVD Northlngs Eastings
(ft) (ft) (ft)
BPXA
Milne Point MPS
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Comments
Measured
Depth
(ft)
9100.00
9160.00
9222.49
9955.85
10087.45
10148.24
10559.77
10754.16
11307.38
11321.21
11905.85
12028.02
13024.28
Comment
4180.81
4179.63
4174.48
4150.91
4155.41
6292.95 N
6351.90 N
6413.23 N
7051.99 N
7126.34 N
3502.35 W
3513.24 W
3524.11 W
3254.88 W
3146.39 W
KOP : Start Dir @ 'Ij. 9100. ,4180.81ftTVD
End Dir, Start Sail.9 60.00ftMD,4179.63ftTVD
Begin Dir @(19J>0~ .,.. .49ft MD, 4174.48ftTVD
End Dir.iatart!$ä1ì\;@~f6a.04' rt~ 9955.85ftMD,4150.91 ftTVD
Begin Ò)~:'. . 'trtttbPft : 1"Ó087.45ft MD, 4155.41 ft TVD
. ;. - "-\~ÿ~~'!
::
......,p' ,
4158.60
4187.51
4198.08
4221.70
4222.19
d Dir, Start, @ 85.971° : 10148.24ftMD,4158.60ftTVD
in Dir @ 4.0000/100ft: 10559.77ft MD, 4187.51ft TVD
ir, Start Sail @ 87.537° : 1 0754.16ftMD ,4198.08ftTVD
Be Dir @ 4.0000/100ft: 11307.38ft MD, 4221.70ft TVD
End Dir, Start Sail @ 87.961° : 11321.21ftMD,4222.19ftTVD
Begin Dir @ 4.0000/100ft : 11905.85ft MD, 4242.99ft TVD
End Dir, Start Sail @ 88.562° : 12028.02ftMD,4246.70ftTVD
Total Depth: 13024.28ftMD,4271.70ftlVD
Target Entry Coordinates
TVD Northings Eastings Target Target
(ft) (ft) (ft) Shape Type
4161.70 6579.04 N 3531.42 W Point
MPS-29L 1 T2 4156.70 7143.27 N 3121.94 W Point
MPS-29L 1 T3 4196.70 7502.22 N 2637.27 W Point
MPS-29L1 T4 4221.70 7903.49 N 2211.72 W Point
10 September, 2002 -16:15
Page8of9
DrHlOuest 2.00.09.008
~ '.
Sperry-Sun Drilling Services
Proposal Report for MPS.29
Revised: 10 September, 2002
BPXA
Milne Point MPS
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
,.,,: '-, .t.
~::: : ' , ,~
Target Ent~y ë"õordh"",
~~~ ij:r~,s:~~>'~ -,'
Target Target
Shape Type
Target
Name
.(
Targets associated with this wellpath (Continued)
:,. (-.
1711.15 W
Point
MPS-29L 1 T5
~~
9188.56 N
1076.38 W
Point
MPS-29L 1 T6
--! f
Drll/Quest 2.00.09.008
Page90f9
10 September, 2002. 16:15
')
)
Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit
to Drill sub section 14 (e) if a well has multiple well branches, each branch requires
a separate Permit to Drill. If multiple well branches are proposed from a single
conductor, surface or production casing, the applicant shall designate one branch as
the primary Well bore and include all information required under (c) of this section
that is unique to that branch and need not include the $100 fee.
Rev: 07110/02
C\j ody\templates
')
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAME/1¡O?t /l1,PS--29¿ I
2-02- /7 h
CHECK WHAT
APPLIES
v
PTD#
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE
SPACING
EXCEPTION
DRY DITCH
SAMPLE
"CLUE"
The permit is for a new wellbore segment of
existing well /I1,;'JCt /I? /05 - ¿ 9
Permit No,2o<. -/f.5API No. ~ -òz9- 2-3//?
Production should continue to be reported as
a function' of the original API number stated
above.
In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit). .
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
peñorate and produce is contingent upon
issuance of a conservation order approving a
spacing , exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater tban 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANy;1j7.;;¿ WELL NAME,Af~ -¿r ¿/ PROGRAM: Exp- Dev - Redrll- Re-Enter - Serv - Wellbore seg:2L
FIELD & POOL.)" 2..ç' / Cjr j INIT CLASS ge ~ - /-¿>IJ j - GEOL AREA ¡: l'd UNIT# ;II.?.:> !? ON/OFF SHORE ~
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . ry' N
2. Lease number appropriate. .. . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
N..? o.J. ~ /¡? 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
4If--- ~<- 9. Operator only affected party.. . . . . . . . . . . . .. . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
1 Z. Permit can be issued without administrative approval.. . . . . \Y) N
{Service Well Only} 13. Well located w/in area & strata authon.'zed by injection order#~&Y.. . /I/,,q \
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. Y. N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . --' N
16. Surface casing protects all known USDWs. . . . . . . . . . . . N
17. CMT vol ádequate to circulate on conductor & surf csg. . . . . ~
18. CMT vol adequate to tie-in long string to surf csg. . . . .. . . -¥--N- ..J'
19. CMT will cover all known productive horizons, . . . . , , " , ~. N- <;!,<J[f'.U
~~: ~~:~~a~::~~~~;~~~~:~~~~ ~it:: ~ ~ :~r~~fr~~t.. : :: : : : '. ~ ;) ~(;-r- /4/
22. If a re-drill, has a 10-403 for abandonment been approved. . . "A. N AI/H-.
23. Adequate wellbore separation proposed.. . . . . . . . . . . . æ N
24. If diverter required, does it meet regulations. . . . . . . . . . '-¥::-N- "'lit-
25. Drilling fluid program schematic & equip list adequate. . . . . f. N YlÆ. cv¡¿ 111~ ( 4 ('l fl... r c¡
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N (pCJ
APPR DATE 27. BOPE press rating appropriate; test to L/ (JOe:) psig. N rn S I> I } L P ç ;.
'¡' A ,1 I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
W~T Q/{..5{OL 29. Work will occur without operation shutdown. . . . . . . . . . . N
30. Is presence of H2S gas probable... . . . . . . . . . . . . . . Y @
31. Mechanical condition of wells within AOR verified. . . . . . . . ~ AlIA-
~
n jUrA.
/'
(Service Well Only)
GEOLOGY
APPR DATE
,d~
. rE~ploratory Only}
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . .
36. Contact name/phone for weekly progress reports. . . . . . . .
GEOLOGY:
RP&G-
PETROLEUM ENGINEERING:
TEM
RESERVOIR ENGINEERING
JDH
UIC ENGINEER
JBR
COMMISSIONER:
COT CtJT
DTS
Comments/Instructions:
SFD
WGAV4A--
MJW
Rev: 07/12/02
G:\geology\permits\checklist.doc
)
')
Well Histor.y File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process'
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special 'effort has been made to chronologically. .
organize this category of information.
)
)
aOd- /90
//3~1
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Dec 09 15:00:53 2002
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/12/09
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... .......... ...UNKNOWN
Continuation Number... ...01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing
Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/12/09
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name......... ...... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments........... ..... .STS LIS Writing
Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-29 L1
500292311960
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
09-DEC-02
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22160
B. ZIEMKE
C. DIXON
MWDRUN 2
AK-MW-22160
B. HENNINGSE
C. DIXON
MWDRUN 3
AK-MW-22160
B. HENNINGSE
C. DIXON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 5
AK-MW-22160
J. STRAHAN
E. VAUGHN
MWDRUN 6
AK-MW-22160
J. STRAHAN
E. VAUGHN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3270
340
MSL 0)
66.60
39.10
1 '
)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 108.0
6.125 7.625 8842.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS
ARE MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1, 2, 3, AND 6 COMPRISED DIRECTIONAL WITH
DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4). RUN 6 ALSO INCLUDED
AT-BIT-INCLINATION
(ABI). THE PURPOSE OF RUN 5, COMPRISING DIRECTIONAL
AND DGR, WAS TO SET
THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE
WHIPSTOCK WAS SET AT
8842' MD IN THE MPS-29 WELL BORE. ONLY ROP DATA FOR
RUN 5 ARE PRESENTED.
4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 10/16/02. MWD DATA
ARE CONSIDERED
PDC.
5. MWD RUNS 1, 2, 3 (PART), AND 6 REPRESENT WELL
MPS-29L1 WITH API#:
50-029-23119-60. THIS WELL REACHED A TOTAL DEPTH
(TD) OF 12950'MD/
4274'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record..65535
File Type...... ......,. ..LO
Previous File Name.. .....STSLIB.OOO
Comment Record
FILE HEADER
)
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
64.0
64.0
64.0
64.0
64.0
71.5
109.0
STOP DEPTH
12903.0
12903.0
12903.0
12903.0
12903.0
12896.0
12950.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 64.0 3213.5
MWD 2 3213.5 7508.5
MWD 3 7508.5 8842.0
MWD 5 8842.0 8869.0
MWD 6 8869.0 12950.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type...... ..... ... ....0
Data Specification Block Type.....O
Logging Direction. ...... ...... ....Down
Optical log depth units.... ... ... .Feet
Data Reference Point....... ...... . Undefined
Frame Spacing......... ...... ..... .60 .1IN
Max frames per record. ...... ......Undefined
Absent value............ ........ ..-999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 64 12950 6507 25773 64 12950
ROP MWD FT/H 1.14 1890 335.736 25683 109 12950
GR MWD API 4.48 119.29 69.1717 25650 71.5 12896
RPX MWD OHMM 0.1 2000 119.642 25679 64 12903
RPS MWD OHMM 0.07 2000 93.663 25679 64 12903
) )
RPM MWD OHMM 0.07 2000 88.2953 25679 64 12903
RPD MWD OHMM 0.07 2000 148.504 25679 64 12903
FET MWD HOUR 0.02 167.74 0.518961 25679 64 12903
First Reading For Entire File......... .64
Last Reading For Entire File..... ..... .12950
File Trailer
Service name... ... ...... .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.... ...02/12/09
Maximum Physical Record. .65535
File Type.. ........ ..... .LO
Next File Name..... ..... .STSLIB.002
Physical EOF
File Header
Service name.... ...... ...STSLIB.002
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation. ..... .02/12/09
Maximum Physical Record..65535
File Type... .... ...... ...LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
RPX
RPM
RPD
FET
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
64.0
64.0
64.0
64.0
64.0
71.5
109.0
STOP DEPTH
3169.5
3169.5
3169.5
3169.5
3169.5
3177.0
3213.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
01-0CT-02
Insite
66.37
Memory
3213.0
108.0
3213.0
2.1
73.1
#
TOOL STRING (TOP TO BOTTOM)
)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type...... ....... .....0
Data Specification Block Type. ....0
Logging Direction....... ..... ... ..Down
Optical log depth units...... ... ..Feet
Data Reference Point. ..... ... ... ..Undefined
Frame Spacing.. ...... ......... ... .60 .1IN
Max frames per record.. .... ...... . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
TOOL NUMBER
66093
103792
9.875
108.0
LSND
9.10
102.0
7.5
600
11.4
7.800
8.220
8.000
5.700
72.0
68.0
72.0
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 64 3213.5 1638.75 6300 64 3213.5
ROP MWD010 FT/H 17.43 1798.06 300.231 6210 109 3213.5
GR MWD010 API 16.08 118.58 61.2295 6212 71.5 3177
RPX MWD010 OHMM 0.1 2000 427.578 6212 64 3169.5
RPS MWD010 OHMM 0.07 2000 318.097 6212 64 3169.5
RPM MWD010 OHMM 0.07 2000 291.288 6212 64 3169.5
) )
RPD MWD010 OHMM 0.07 2000 542.34 6212 64 3169.5
FET MWD010 HOUR 0.02 2.36 0.332265 6212 64 3169.5
First Reading For Entire File.. ....... .64
Last Reading For Entire File.......... .3213.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
F i 1 e Type... . . . . . . . . . . . . . LO
Next File Name...... .... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation..... ..02/12/09
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
FET
RPD
RPM
RPS
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
3170.0
3170.0
3170.0
3170.0
3170.0
3177.5
3214.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
STOP DEPTH
7464.0
7464.0
7464.0
7464.0
7464.0
7472.0
7508.5
03-0CT-02
Insite
66.37
Memory
7508.0
3213.0
7508.0
67.2
74.2
TOOL NUMBER
) )
DGR DUAL GAMMA RAY 66093
EWR4 ELECTROMAG. RESIS. 4 103792
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 9.875
DRILLER'S CASING DEPTH (FT): 108.0
#
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 9.20
MUD VISCOSITY ( S) : 134.0
MUD PH: 7.0
MUD CHLORIDES (PPM): 500
FLUID LOSS (C3): 9.4
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): 8.000 75.0
MUD AT MAX CIRCULATING TERMPERATURE: 7.910 75.9
MUD FILTRATE AT MT: 8.000 75.0
MUD CAKE AT MT: 6.000 75.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ............ ..0
Data Specification Block Type.. ...0
Logging Direction........... ... ...Down
Optical log depth units..... .... ..Feet
Data Reference Point... ......... ..Undefined
Frame Spacing. ...... ..... ..... ... .60 .1IN
Max frames per record.......... ...Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3170 7508.5 5339.25 8678 3170 7508.5
ROP MWD020 FT/H 11.03 1890 488.312 8590 3214 7508.5
GR MWD020 API 4.48 114.74 65.5595 8590 3177.5 7472
RPX MWD020 OHMM 4.52 273.27 15.9172 8589 3170 7464
RPS MWD020 OHMM 3.79 412.97 16.2883 8589 3170 7464
RPM MWD020 OHMM 1.14 1390.59 16.6864 8589 3170 7464
RPD MWD020 OHMM 1.69 1445.87 17.9489 8589 3170 7464
)
FET MWD020 HOUR
0.05
)
8.06
0.41744 8589
First Reading For Entire File......... .3170
Last Reading For Entire File.... ..... ..7508.5
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type............... .LO
Next File Name......... ..STSLIB.004
Physical EOF
File Header
Service name. ...... ..... .STSLIB.004
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type... ... ......... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPS
RPM
FET
RPD
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
7464.5
7464.5
7464.5
7464.5
7464.5
7472.5
7509.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL ( FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
STOP DEPTH
8842.0
8842.0
8842.0
8842.0
8842.0
8842.0
8842.0
04-0CT-02
Insite
66.37
Memory
8842.0
7508.0
8842.0
67.6
88.7
TOOL NUMBER
66093
3170
7464
) )
EWR4 ELECTROMAG. RES IS. 4 103792
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE ( IN): 9.875
DRILLER'S CASING DEPTH (FT): 108.0
#
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 9.20
MUD VISCOSITY (S): 111.0
MUD PH: 7.0
MUD CHLORIDES (PPM): 500
FLUID LOSS (C3): 8.6
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): 3.500 75.0
MUD AT MAX CIRCULATING TERMPERATURE: 2.580 104.0
MUD FILTRATE AT MT: 7.000 75.0
MUD CAKE AT MT: 3.300 75.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type...... .... ... .....0
Data Specification Block Type.....O
Logging Direction.............. ...Down
Optical log depth units......... ..Feet
Data Reference Point...... ...... ..Undefined
Frame' Spacing. . . . . . . . . . . . . . . . . . . . .60 .1IN
Max frames per record...... ...... .Undefined
Absent value.............. ..... ...-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7464.5 8842 8153.25 2756 7464.5 8842
ROP MWD030 FT/H 12.9 819.68 217.916 2667 7509 8842
GR MWD030 API 29.51 110.78 74.3909 2740 7472.5 8842
RPX MWD030 OHMM 4.84 567.44 17.8896 2756 7464.5 8842
RPS MWD030 OHMM 4.94 114.05 17.8984 2756 7464.5 8842
RPM MWD030 OHMM 5.05 82.22 18.6273 2756 7464.5 8842
RPD MWD030 OHMM 5.23 77.7 19.5625 2756 7464.5 8842
FET MWD030 HOUR 0.07 17.4 0.963037 2756 7464.5 8842
)
)
First Reading For Entire File.... ......7464.5
Last Reading For Entire File.......... .8842
File Trailer
Service name..... ..... ...STSLIB.004
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation.... ...02/12/09
Maximum Physical Record..65535
File Type................LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name. ......... ...STSLIB.005
Service Sub Level Name...
Version Number.. ... .... ..1.0.0
Date of Generation... ... .02/12/09
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
ROP 8842.5
$
5
header data for each bit run in separate files.
5
.5000
STOP DEPTH
8869.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
11-0CT-02
Insite
66.37
Memory
8869.0
8842.0
8869.0
87.6
92.0
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
TOOL NUMBER
91360
162742
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.750
8842.0
#
)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... ..... ..... . Down
Optical log depth units. ......... .Feet
Data Reference Point.... ......... . Undefined
Frame Spacing..................... 60 .1IN
Max frames per record........... ..Undefined
Absent value..... ...... ...... ... ..-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Flo-Pro
9.00
52.0
8.0
16400
5.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD050 FT/H
Min
8842.5
2.22
Max
8869
94.15
First Reading For Entire File....... ...8842.5
Last Reading For Entire File.... ..... ..8869
File Trailer
Service name... ......... .STSLIB.005
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record. .65535
File Type........ ....... .LO
Next File Name..... ..... .STSLIB.006
Physical EOF
Mean Nsam
8855.75 54
10.8417 54
)
.0
81.2
.0
.0
First
Reading
8842.5
8842.5
Last
Reading
8869
8869
)
File Header
Service name...... ..... ..STSLIB.006
Service Sub Level Name. . .
Version Number..... ..... .1.0.0
Date of Generation...... .02/12/09
Maximum Physical Record..65535
File Type............... .LO
Previous File Name..... ..STSLIB.OO5
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
6
)
header data for each bit run in separate files.
6
.5000
START DEPTH
8842.5
8842.5
8842.5
8842.5
8842.5
8842.5
8869.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
12903.0
12903.0
12903.0
12903.0
12896.0
12903.0
12950.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
13-0CT-02
Insite
66.37
Memory
12950.0
8869.0
12950.0
85.0
94.8
TOOL NUMBER
91360
162742
6.125
8842.0
Flo-Pro
9.15
50.0
8.0
18000
4.9
.210
.170
.190
.270
77.0
96.6
70.0
72.0
)
)
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.. ................0
Data Specification Block Type.....O
Logging Direction....... ......... . Down
Optical log depth units. ... ..... ..Feet
Data Reference Point............. . Undefined
Frame Spacing..................... 60 .1IN
Max frames per record... ......... . Undefined
Absen t value. . . . . . . . . . . . . . . . . . . . . . - 9 9 9
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8842.5 12950 10896.3 8216 8842.5 12950
ROP MWD060 FT/H 1.14 745.73 242.822 8162 8869.5 12950
GR MWD060 API 43.56 119.29 77.3197 8108 8842.5 12896
RPX MWD060 OHMM 0.29 2000 28.3379 8122 8842.5 12903
RPS MWD060 OHMM 0.48 2000 29.5398 8122 8842.5 12903
RPM MWD060 OHMM 0.11 2000 32.4058 8122 8842.5 12903
RPD MWD060 OHMM 0.11 2000 29.0986 8122 8842.5 12903
FET MWD060 HOUR 0.12 167.74 0.618424 8122 8842.5 12903
First Reading For Entire File. ..... ....8842.5
Last Reading For Entire File.......... .12950
File Trailer
Service name.... ........ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation. ... ...02/12/09
Maximum Physical Record. .65535
File Type....... ........ .LO
Next File Name......... ..STSLIB.007
Physical EOF
Tape Trailer
)
Service name....... .... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/12/09
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.... ........... . UNKNOWN
Continuation Number.... ..01
Next Tape Name... ...... ..UNKNOWN
Comments.. ........ ...... .STS LIS
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/12/09
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.... .......... ..UNKNOWN
Continuation Number.... ..01
Next Reel Name..... ..... . UNKNOWN
Comments................ .STS LIS
Physical EOF
physical EOF
End Of LIS File
)
Writing Library. Scientific Technical Services
Writing Library. Scientific Technical Services