Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-211 STATE OF ALASKA
AIIIIL OIL AND GAS CONSERVATION COMM ION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other:Scale Inhibitor Treatment LI
2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development 0 Exploratory❑ 202-211
3.Address: Stratigraphic❑ Service ❑ 6.API Number:
P.O. Box 100360, Anchorage, AK 99510 50-103-20434-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL 380075, 380077 CRU CD2-37
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
None Colville River Field/Alpine Oil Pool
11.Present Well Condition Summary:
Total Depth measured 17085 feet Plugs measured None feet
true vertical 7337 feet Junk measured None feet
Effective Depth measured 17085 feet Packer measured
13062 feet
true vertical 7337 feet true vertical 7058 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 78' 16" 114' 114'
Surface 3060' 9.625" 3096' 2391'
Intermediate
Production 14129' 7" 14163' 7336' RECEIVED
Liner
OCT 2 b 201b
Perforation depth Measured Depth: Open Hole Completion, 14162'- 17085' SCANNED i jt, f'
,?Pty, AUG �
True Vertical Depth: 7336'-7337' ` " 'd"
Tubing(size,grade,measured and true vertical depth) 4.5"x 3.5", L-80, 13148' MD, 7098'TVD
Packers and SSSV(type,measured and true vertical depth) Packer: Baker SAB-3 Packer, 13062' MD, 7058'TVD
SSSV: Camco TRM-4E, 2327' MD, 2018'TVD
12.Stimulation or cement squeeze summary:
Intervals treated(measured): 14163'- 17085' MD
Treatment descriptions including volumes used and final pressure: Please see attached summary
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 312 365 104 754 211
Subsequent to operation: 328 364 116 797 209
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations Il Exploratory❑ DevelopmentE Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil I] Gas
❑ WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Stefan Weingarth Email Stefan.G.Weingarthconocophillips.com
Printed Name Stefan Weinti.rth Title Production Engineer
Signature c ,t/ 4... ...„.A Phone 265-6038 Date S
Form 10 404 Revised 5/2015 , - 0,06 RBDMS VV OCT 2 8 2016
Submit Original Only
• •
•
CD2-37 Scale Inhibition Treatment
9/26/16
Hybrid Scale Inhibitor Squeeze Job pumped from 07:45 to 19:25 hrs on 9/26/16.
LRS= Little Red Services
- Initial pressure TBG/IA/OA=700/734/377
- LRS pumped 40 bbls Diesel/WAW5206/M209 preflush at.5 bpm,TBG/IA/OA= 275/729/501
- LRS pumped 60 bbls Seawater/SCW3001 scale inhibitor main treatment at .75 bpm,TBG/IA/OA
=0/724/596
- LRS pumped 400 bbls dead crude overflush at .75 bpm,TBG/IA/OA=0/712/475
Interval treated (MD): 14163'—17085'
WNS PROD 40 CD2-37
. ConocoPhillips 3 Well Attributes Max Angle&MD TD
Alaska,Inc. Wellbore API/I'WI Field Name Wellbore Status ncl 7) MD(ftKB) Act Ban(ftKB)
,,.. Nabs 501032043400 ALPINE PROD 94.13 17,003.94 17,085.0
••• Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1
CO2-37,12/4/20152;00;21 PM SSSV:TRDP Last WO: 43.81 11/28/2002
vertical soneraanc(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date
Last Tag: 13,565.0 1/14/2006 Rev Reason:GLV C/O lehallf 12/4/2015
T
.
HANGER;32.7 I' II Casing Strings
.eCasing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread
CONDUCTOR 16 14.688 36.0 114.0 114.0 109.00 H-40 WELDED
Casing Description 'OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WVLen(I...Grade Top Thread
SURFACE 9 5/8 8.921 36.4 3,096.2 2,391.4 36.00 J-55 BTC
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread
PRODUCTION 7 6.276 34.4 14,162.5 7,336.1 26.00 L-80 BTCM
Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread
i. OPEN HOLE 61/8 6.125 14,162.0 17,085.0 7,336.7
4 11 Tubing Strings
- -ter Tubing Description [String Ma...l ID(in) !Top(ftKB) [Set Depth(ft..1 Set Depth(TVD)(...IWt(Ib/ft) [Grade [Top Connection
TUBING 4.5x3.5 Il 31/2 2.992 32.7 13,147.711 7,097.611 9.30 L-80 II EUE mod
CONDUCTOR,360-1140 J• -
Completion Details
Nominal ID
. Top(ftKB) Top(TVD)(ftKB) Top Incl 7) Item Des Corn (in)
32.7 32.7 0.00 HANGER FMC TUBING HANGER 4.500
122.6 122.6 0.13 X04.5x3.5 TUBING CROSSOVER 2.922
2,327.3 2,018.0 56.60 SAFETY VLV CAMCO TRM-4E SSSV 2.812
I 12,972.9 7,015.8 61.19'SLEEVE-C BAKER CMPA SLIDING SLEEVE-BAKER CMPA 2.812
SLIDING SLEEVE,CLOSED 3/18/2004
SAFETY VLV;z,a272 el, NOTE: SLIDING SLEEVE-CLOSE UP,OPEN DOWN
I13,061.6 7,058.2 61.90'PACKER BAKER SAB-3 PAKER w/millout extension 3.875
13,117.4 7.084.0 63.03 NIPPLE HES XN NIPPLE 2.750
13,147.2 7,097.4 63.66 WLEG BAKER WIRELINE GUIDE 3.875
Stimulations&Treatments
Min Top Max Blm
Depth Depth Top(11/0) Btm(TVD)
(ftKB) (ftKB) (ftKB) (ftKB) Type
Mandrel Inserts
Date Com
14,162.0 17,085.0 7,336.0 7,336.7 FRAC 3/20(2004 314,120#16/20 CARBO-LITE,2045 EELS YFGO-
111;7.6#PG PLACED IN FORMATION
SURFACE,36.4-3,096.2 -
St
on'
I at
Top(TVD) Valve Latch Port Sire TRO Run
N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com
GAS LIFT;5,364.6 1 5,364.6 3,431.3 CAMCO KBUG 1 GAS LIFT GLV BK 0.188 1,868.0 11/28/2015
I 2 10,296.4 5,743.6 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 5/19/2007
3 12,883.4 6,972.4 CAMCO KBUG 1 GAS LIFT OV BL 0.250 0.0 11/28/2015
I
I Notes:General&Safety
End Date Annotation
11/25/2002 NOTE:TREE:FMC 4 1/16 5K-TREE CAP CONNECTION:7"OTIS
GAS LIFT;10,296 4II 12/10/2002 NOTE:ABLE TO PASS DOWN TO 13625 W/2.60"G-RING
II9/1/2010 _-NOTE:VIEW SCHEMATIC w/Alaska Schematic9.0
I
II
GAS LIFT;12,8834
SLEEVE-C;12,972.9
PACKER;13,0616
NIPPLE;13,1174 1 F
II
WLEG;13,147.2 ,'",
!
PRODUCTION,34.4-14,162.5 +
FRAC;14,162.0
OPEN HOLE;14,162 0 17,085.0
TATE OF ALASKA
ALASKA OIL ANdirNs CONSERVATION COMMISSION •
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed: Abandon r Repair w ell j'""' Plug Perforations r Stimulate r Other 17 Scale Inhibition
P Tubing Ft?rforate New Pool Waiver Treatment
Alter Casing �"" 9 � r T ime Extension J -'-"
Change Approved Program r Operat. Shutdow n r Perforate r Re -enter Suspended Well r
2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development Fii Exploratory r ` 202 -211
3. Address: 6. API Number:
Stratigraphic r Service r
P. O. Box 100360, Anchorage, Alaska 99510 4 50 103 - 20434 - 00 0 0
7. Property DesignalionSLease Number): 8. Well Name and Number:
ADL 380075, 380077 - CD2 -37
9. Field /Pool(s):
Colville River Field / Alpine Oil Pool
10. Present Well Condition Summary:
Total Depth measured 17085 feet Plugs (measured) None
1 true vertical 7298 feet Junk (measured) None
Effective Depth measured 17085 feet Packer (measured) 13062
true vertical 7298 feet (true vertucal) 7058
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 78 16 114 114
SURFACE 3060 9.625 3096 2391
PRODUCTION 14128 7 14162 7337
R.Ec i ''ED
. ,Itkii I 1 <, ti'il DEC 0
Perforation depth: Measured depth: open hole from 14162' 17085'
True Vertical Depth: 7337' - 7298' ' J ka Oil & Gas Co c r; �rr;'�
Anchol:. ,
Tubing (size, grade, MD, and TVD) 4.5 x 3.5, L - 80, 13148 MD, 7097 TVD
Packers & SSSV (type, MD, and TVD) PACKER - BAKER SAB -3 PAKER W /MILLOUT EXTENSION @ 13062 MD and 7058 TVD
SSSV - CAMCO TRM -4E @ 2327 MD and 2018 TVD
11. Stimulation or cement squeeze summary:
Intervals treated (measured): 14162' - 17085'
Treatment descriptions including volumes used and final pressure: see attached summary
12. Representative Daily Average Production or Injection Data
Oil - Bbl Gas - Mcf Water - Bbl Casing Pressure Tubing Pressure
Prior to well operation 124 719 57 -- 235
Subsequent to operation 461 1597 145 -- 237
13. Attachments 14. Well Class after work:
Copies of Logs and Surveys run Exploratory r Development 17 A Service r Stratigraphic r
15. Well Status after work: < Oil I Gas r WDSPL E
Daily Report of Well Operations XXX GSTOR r WINJ `"' WAG r GINJ r SUSP r SPLUG fl
16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
none
Contact Dan Kolesar @ 263 -4039
Printed Name Dan Kolesar Title WNS Production Optimization Engineer
Signature Phone: 263 -4039 Date a . 'g - 2at
Form 10 -404 Revised 10/2010 moms DEC 0 9 Z0� Submit Original Only
a IONS CD2 -37
ConocoPhillips 0.3 Well Attributes Max Angle & D TD
Alaska, II1C. Wellbore APIIUWI Field Name Well Status Inc! (°) MD (ftKB) Act Btm (ftKB)
conoairtd° 501032043400 ALPINE PROD 94.13 17,003.94 17,085.0
Comment H2S (ppm) Date Annotation End Date K8 (ft) Rig Release Date
"- SSSV: TRDP Last WO: 4181 11/28/2002
Well Caney, - CD2-37 2/7/2011 2 34:20 PM - -
Schematic - Actual Annotation Depth (ftKB) End Date Annotation Last Mod ... End Date
Last Tag: 13,565.0 1/14/2006 Rev Reason: GLV C/O Imosbor 2/7 /2011
Casing Strings
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
CONDUCTOR 16 14.688 36.0 114.0 114.0 109.00 H WELDED
HANGER, 33 . Casing Description String O... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
_._ SURFACE 95/8 8.921 36.4 3,096.2 2,390.8 36.00 J BTC
Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
„ ' PRODUCTION 7 6.151 34.4 14,162.5 7,336.7 26.00 L - 80 BTCM
Casing Description String 0... String ID ... Top (ftK8) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
OPEN HOLE 6 1/8 6.125 14,162.0 17,085.0 7,336.7
Tubing Strings
Tubing Description String 0... String ID ... Top (MB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd
TUBING4.5x3.5 31/2 2.992 32.7 13,147.7 7,095.9 9.30 L -80 EUE -mod
Completion Details
Top Depth
CONDUCTOR, (TVD) Top Inc! Nomi...
36 Top (ftKB( (111(8) (°) Item Description Comment ID (in)
32.7 32.7 -1.22 HANGER FMC TUBING HANGER 4.500
122.6 122.6 0.13 X04.5x3.5 TUBING CROSSOVER 2.922
I 2,327.3 2,018.0 56.58 SAFETY VLV CAMCO TRM-4E SSSV 2.812
12,972.9 7,014.3 60.10 SLEEVE -C BAKER CMPA SLIDING SLEEVE - BAKER CMPA SLIDING SLEEVE, 2.812
CLOSED 3/18/2004
NOTE: SLIDING SLEEVE - CLOSE UP, OPEN DOWN
SAFETY VLV, { • I 13,061.6 7,058.2 61.90 PACKER BAKER SAB-3 PAKER w /millout extension 3.875
2,327
- i 13,117.4 7,083.9 63.03 NIPPLE HES XN NIPPLE 2.750
13,147.2 7,095.7 63.80 WLEG BAKER WIRELINE GUIDE 3.875
Stimulations & Treatments
Bottom
Min Top Max Btm Top Depth Depth
Depth Depth (TVD) (TVD)
(ftKB) (ftKB) (ftKB) (ftKB) Type Date Comment
14,162.0 17,085.0 7,336.6 7,336.7 FRAC 3/20/2004 314,1208 16/20 CARBO-LITE, 2045 BBLS
SURFACE . J Notes: General & Safety
36 -3 096
End Date Annotation
11/25/2002 NOTE: TREE: FMC 4 1/16 5K - TREE CAP CONNECTION: r OTIS
12/10/2002 NOTE: ABLE TO PASS DOWN TO 13625 W/2.60" G -RING
9/1/2010 NOTE: VIEW SCHEMATIC w /Alaska Schematic9.0
GAS LIF
5 5
GAS LIFT,
10
L-1
GAS LIFT,
12,883 1 L --
SLEEVE -C. '. I '
12.973
11
PACKER,
13.062 -
I
NIPPLE. 13.117 I .
Mandrel Details
Top Depth Top Port
i 1
(TVD) Ind OD Valve Latch Size TRO Run
WLEG. 13,147 i. J Ste Top (ftKB) (ftKB) (1 Make Model (in) Sery Typo Type (in) (psi) Run Date Com...
VVV 1 5,364.6 3,431.2 60.04 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 5/18/2007
2 10,296.4 5,744.4 64.29 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 5/19/2007
3 12,883.4 6,972.1 60.65 CAMCO KBUG 1 GAS LIFT OV BK 0.250 0.0 2/5/2011
PRODUCTION.
2 I •
3414,16182 h • ° ,
FRAC, 14,162 •••
HOLE.
OPEN H OLE. •
14,162 - 17,085 ° -
70,17,065 •
• •
CD2 -37 (Hybrid), 11/7/2011
Scale Inhibition Treatment
Initial pressure TBG /IA /OA- 375/925/440; LRS pumped 14 bbls dead crude containing 113 gal
WAW5206 at 3.25 bpm, 800/900/460;
LRS pumped 113 bbls SW containing 715 gal SCW3001WC at 3.4 bpm, 1100/900/450; LRS
pumped 14 bbls of crude containing 113 gaTWAW5206 at 2 bpm, 2400/900/500; LRS pumped
666 bbls crude at 0.65 bpm overflush, 3000/900/760.
.
.
"VELL LOG TRA;.\'SMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West th Avenue, Suite 100
Anchorage, Alaska 99501-3539
April 26, 2007
RE: MWD Formation Evaluation Logs: CD2-37
AK-MW-22175
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted CD Rom with verification listing.
API#: 50-103-20434-00
RECEIVED
.",........_,_...~_.
MAY 0 8 Z007
,~~ ,,oil & Gas C.{¡i1s. C¡¡mmissicfR
;i\r&fage
s~E.D MA'( O· 9 'lfJfJ7
~\tii.,:,
.. ,.
éJD'd-C),l {
ft tS{f to
'Y'
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 11, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
þ.~\\ ~ '1 ?SJ~l
.,,~tD
-~ I
d()~ - d-t}
Dear Mr. Maunder:
Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated
3/31/07 was incomplete.
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was
noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07.
Please find enclosed updated spreadsheet, and replace. As per previous agreement with the
AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~z::~----_/
ConocoPhillips Well Integrity Project Supervisor
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name pro # cement pumped cement date inhibitor sealant date
ft bbls ft Qal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-1 09 6" na 6" na 2.5 2/18/2007
C02-404 206-054 6" na 6" na 1.8 3/22/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
C02-30 203-135 8" na 8" na 3 3/8/2007
C02-31 204-082 15" na 15" na 6 3/8/2007
C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CQ2..37 202-211 29" na 29" na 13.8 2/18/2007
C02-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
.
.
~
ConocoPhillips
Alaska
,-'"
.J
i
I
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
81
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
...- fJ-.. \ \
~Oa-:
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells ITom the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water ITom entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
5CANNED APR 0 9 2007
~~C
" Jerry Dethlefs .
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD2-1 205-118 4" na 4" na 2 2/18/2007
CD2-2 205-1 09 6" na 6" na 2.5 2/18/2007
CD2-7 203-187 16" na 16" na 7.5 2/17/2007
CD2-9 202-129 22" na 22" na 10.5 2/17/2007
CD2-12 203-073 16" na 16" na 7.5 2/17/2007
CD2-14 201-177 4" na 4" na 2 2/17/2007
CD2-15 201-159 12" na 12" na 5.7 2/17/2007
CD2-16 202-144 11'7" 1.6 4" 4/16/2003 1 3/8/2007
CD2-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
CD2-18 203-151 36" na 36" na 17 2/17/2007
CD2-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
CD2-21 204-245 6" na 6" na 2.5 2/18/2007
CD2-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
CD2-24 201-095 6" na 6" na 1 3/8/2007
CD2-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
CD2-28 202-217 29" na 29" na 11 3/8/2007
CD2-30 203-135 8" na 8" na 3 3/8/2007
CD2-31 204-082 15" na 15" na 6 3/8/2007
CD2-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
CD2-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
CD2-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
CD2-37 202-211 29" na 29" na 13.8 2/18/2007
CD2-38 202-171 18" na 18" na 8.5 2/18/2007
CD2-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 318/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 29, 2006
RE: MWD Formation Evaluation Logs: CD2-35A, CD2-37, CD2-40_PB1, CD2-53,
CD2-54 Ll.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
CD2-35A: Ù:I:Œ.- 9ö'd -d-4¿/~1...{3if~
Digital Log Images:
50-103-20256-01
1 CD Rom
CD2-37: 9Ó~-Q.11 ti:: IL/3Õ'Ì 2.007
Digital Log Images: 5cA.N'~ED rea () 1
50-103-20434-00
1 CD Rom
CD2-40_PB1: UJ:c...'dÖ5-t~(P +¡L./3'1ò I
Digital Log Images:
50-103-20464-00, 70
1 CD Rom
CD2-53: 'd()L{ -0711 ~ IL{3C7J
Digital Log Images:
50-103-20494-00
1 CD Rom
vIe.
CD2-S4_L1: VIC- 904- ¡1-~ tt 143D¡¢I dtl--I-Ðð~ 1I1L./~3
Digital Log Images: ¡
50-103-20499-00, 60
1 CD Rom
1-
e
e
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
3Üð - d--II
February 16, 2006
I ?JÞS'4-
RE: MWD Formation Evaluation Logs CD2-37,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
CD2-37:
LAS Data & Digital Log Images:
50-103-20434-00
1 CD Rom
~QQil\
~ðt~!do
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Matker.doc
)
)
~(J~~ ~,l\
01-Feb-05
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-37(Sag Corrected)
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD (if applicable)
17,085.00' MD
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF: '
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518 ~ I 11 I / I I
Date J r:¿ lJòù 7~ Signed ~ÚJdvvj
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
S '"'AN I.. í E"""'[i F- ~: B' (\ " ,'¡ 01 r] ~
'-~ ~', ''l--,.~ L., ) ":t { d".,
JJJ;¿ - Å,ll
')
)
cÄf)Z-~11
WE:LL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Cornm.
Attn.: Howard Okland
333 West 7th Avenue, Suite loa
Anchorage, Alaska 99501-3539
February 18,2004
RE: MWD Formation Evaluation Logs: CD2-37,
AK-MW-22175
CD2-37:
Digital Log Images:
50-103-20434-00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION' OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date: ¡; fs
','" ,c-" ,> ' 'N' ·E'~-\, i\ Ol~: .,~ f\ 2n Pi?
1", .-~ ~ , I ,... ..J ..,IV
\~\i'A.N. =.., .' ., ., t.
~~ ~~.\-. ~'i
DATA SUBMITTAL COMPLIANCE REPORT
12/29/2004
Permit to Drill 2022110
Well Name/No. COLVILLE RIV UNIT CD2-37
Operator CONOCOPHILLlPS ALASKA INC
API No. 50-103-20434-00-00
MD 17085 // TVD 7298 ./"
Completion Date 11128/2002'/
Completion Status 1-OIL
Current Status 1-OIL
UIC N
----~---- _._----------~-------~-~
----~~~----~.~._----------~-----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey GP ~.,
---.-- ._.w_---~-_.__._- --------
- - ~- . - ~- __n__-~-~----
DATA INFORMATION
Types Electric or Other Logs Run: GRI\res, Acoustic Caliper
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number
~pi--------_._-~
Rpt
Rpt
Name
Directional Survey
Directional Survey
Directional Survey
Log Log Run
Scale Media No
1
Interval OH /
Start Stop CH
611 17085 Open
0 611 Open
611 17085 Open
~!
Received Comments
1/3/2003 MWD
1/3/2003 GYRO
1/3/2003
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 10/16/2002.
. ---------
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
Well Cored?
ADDITIONAL INFORMATION
yG
Chips Received? ~
~
Daily History Received?
~N
(DN
FormatioriTops
Analysis
Received?
~..
~'N"--
._-_..._-----~-- ----- ---
ê~~~~-~~~-:.-"---Tt\J ~
(~~
GJ.h. J (~'^""- ,~l k'),. I~.~ À ~ '/ L{ (; I 1-
G 'J '-- w~ r.- ~ J..t..-.. ~ l}-¡¡
--------~--------~~~
)~
Date:
r ') ') '~ (--
Ið \) G'-... r/-- lJ V
"-----,-- ---~--_.-----_.~-----
Compliance Reviewed By: -
)
)
Mike Mooney
Wells Group Team Leader
Drilling & Wells
ConocJP'hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-263-4574
May 12, 2004
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Report of Sundry Well Operations for CD2-37 (APD # 202-211)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Report of Sundry Well Operations
for the recent stimulation operations on the Kuparuk well CD2-37.
If you have any questions regarding this matter, please contact me at 263-4574.
Sincerely,
J.(kb
M. Mooney
Wells Group Team Leader
CPAI Drilling and Wells
MM/skad
RECEIVED
MAY 1 2 2004
Alaska Oii & Gas Cons. Commission
Anchorage
ORIG~NA~
Abandon D
Alter Casing D
Change Approved Program D
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
1. Operations Performed:
)
')
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RepairWell D
Pull Tubing D
Operat. ShutdownD
Stimulate 0 Other D
Waiver D Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
202-2111
6. API Number:
50-103-20434-00
Plug Perforations D
Perforate New Pool D
Perforate D
4. Current Well Status:
Development - 0
Stratigraphic D
Exploratory D
Service D
P. O. Box 100360
7. KB Elevation (ft):
RKB 36'/52.7' AMSL
8. Property Designation:
ADL 380075 & 380077
9. Well Name and Number:
CD2-37
10. Field/Pool(s):
Colville River Field 1 Alpine Oil Pool
11. Present Well Condition Summary:
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
Perforation depth:
measured 17085' feet
true vertical 7296' feet
measured 17085' feet
true vertical 7296' feet
Length Size MD
114' 16" 115'
3043' 9-5/8" 3096'
141 09' 7" 14162'
2923' 5-1/2" 17085'
Plugs (measured)
Junk (measured)
TVD
Burst
Collapse
115'
2382'
7295'
7296'
Measured depth: open hole completion 14162'-17085'
RECEIVED
MAY 1 2 2004
Alaska Oil & Gas Cons. Commission
Anchorage
true vertical depth: 7295'.7296'
Tubing (size, grade, and measured depth) 4-1/2" , L-80, 13148' MD.
Packers & SSSV (type & measured depth) Baker SAB-3 pkr pkr @ 13062'
SSSV= Cameo TRM-4E SSSV SSSV= 2327'
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
141621-170851
314,120# 16/20 Carbo-Lite
13.
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl
236
2198
15. Well Class after proposed work:
Exploratory D Development 0 Service D
16. Well Status after proposed work:
oil0 GasD WAGD GINJD WINJ D
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A it C.O. Exempt:
~o'-l- cÇ07 ß.,Þt:J
Prior to well operation
Subsequent to operation
14. Attachments
Copies of Logs and Surveys run -
Daily Report of Well Operations _X
Contact
Printed Name
Signature
Oil-Bbl
1887
2596
CasinQ Pressure
TubinQ Pressure
288
284
2
WDSPLD
Mike Mooney @ 263-4574
Mike Mooney
.~J. )I¡~
Title
Phone
Wells Group Team leader. /
Date '3/>I/O¿
Prepared bv Sharon AIISUI:J-Drlke 263-4612
MAV 1 3 200~
Submit Original Only
L
Form 10-404 Revised 04/2004
ORIGINAL
)
/
ALPINE
~ )
- ConocoPhillips Alaska,lìtC.
TUBING
(124-13148,
OD:3.500,
ID:2.992)
SURFACE
(0-3096,
OD:9.625,
Wt:36.00)
'RODUCTION
(0-14162,
OD:7.000,
Wt:26.00)
Gas Lift
ndrel/Dummy
Valve 2
10296-10297,
OD:5.390)
Gas Lift
ndrel/Dummy
Valve 3
12883-12884,
OD:5.390)
SLEEVE-C
12973-12974,
OD:5.325)
PACKER
13062-13063,
OD:5.970)
NIP
13117-13118,
OD:3.750)
WLEG
13147-13148,
OD:5.000)
FRAC
14162.17085)
OPEN HOLE
14162-17085,
OD.6 125)
. l~
'~~.. -
--;',.."
. ". ,
ì^'
':',........,... 01.j-
'<1:~, - '!
..
~] i' ,::;;; .
~ ~
I! .... ,
IIi
I:~' -
:"~~ . . :1
, . :~'.
.
. ,
. .
~.'
I ~ ':
II
)
\
j
;.'j":..'fj.
. ,
' . . ""'-."
... :,,'.
I .
CD2-37
API: 501032043400
SSSV Type: TRDP
Well Type: PROD
Orig 11/28/2002
Completion:
Last W/O:
Angle @ TS: deg @
Angle @ TD: 94 deg @ 17085
Annular Fluid:
Rev Reason: GL V design, pull
Sparteks, pull
FRAC sleeve
Last Update: 4/6/2004
Reference Log: RKB 36
Last Tag:
Last Tag Date:
Ref Log Date:
TO: 17085 ftKB
Max Hole Angle: 94 deg @ 17085
Casing String. ALL STRINGS
Description
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
Tubing String - TUBING
Size Top
4.500 0
3.500 124
Stimulations & Treatments
Interval Date
14162 - 17085 3/20/2004 FRAC
Size
16.000
9.625
7.000
6.125
Top Bottom TVD Wt Grade Thread
0 114 114 109.00 H-40 WELDED
0 3096 2382 36.00 J-55 BTC
0 14162 7295 26.00 L-80 BTCM
14162 17085 17085 0.00
TVD Wt Grade Thread
124 12.60 L-80 8RD
7060 9.30 L-80 EUEMOD
Bottom
124
13148
Type
Comment
314,120# 16/20 CARBO-LITE, 2045 BBLS YFGO-111; 7.6# PG
PLACED IN FORMATION
Gas Lift MandrelsNalves
St MD TVD Man Man Type
Mfr
1 5365 3416 CAMCO KBUG
2 10296 5714 CAMCO KBUG
3 12883 6936 CAMCO KBUG
Other (plugs, equip., etc.) . JEWELRY
Depth TVD Type
33 33 HANGER FMC 4.5" TUBING HANGER
124 124 XO
2327 2013 SSSV
12973 6979 SLEEVE-C
VMfr V Type VOD Latch Port TRO
GLV 1.0 BK 0.188 1729
GLV 1.0 BK 0.188 1938
OV 1.0 BK 0.250 0
Description
Date
Run
4/4/2004
4/4/2004
4/4/2004
Vlv
Cmnt
ID
3.500
3.500
2.812
2.812
13062 7021 PACKER
13117 7046 NIP
7060 WLEG
CAMCO TRM-4E SCSSV
BAKER CMPA SLIDING SLEEVE, CLOSED 3/18/2004
NOTE: SLIDING SLEEVE - CLOSE UP, OPEN DOWN
BAKER SAB-3 PACKER W/MILLOUT EXTENSION
HES 'XN' NIPPLE WINO GO PROFILE
BAKER WIRELlNE GUIDE
3.875
2.750
3.875
Date Note
11/25/2002 TREE: FMC 41/16 5K
TREE CAP CONNECTION: 7" OTIS
12/10/2002 ABLE TO PASS DOWN TO 13625 W/2.60" G-RING
)
CD2-37 Well Events Summary
')
Date Summary
03/15/04 OBTAINED SBHP @ 13,779' RKB: 3452 PSI. PULLED 1" OV @ 12,885 'RKB, SET 2.81"
XN CAT SV @ 13,1171 RKB, PRE-FRAC JOB IN PROGRESSD
[Pressure Data, Frac-Refrac]
03/16/04 DISPLACED TBG/CSG WITH 455 BBL DSL. PULLED 1" GLVs @ 5365' & 10,2961 RKB,
SET DVs @ SAME. SET 1" SPARTEKGAUGE @ 13,117' RKB. IN PROGRESS. D
[Frac-Refrac]
03/17/04 TBG TEST FAILED. REPLACED DV @ 10297' RKB, REPLACED GAUGE @ 12,8851 RKB
WITH DV. TBG TEST FAILED, GOOD TEST ABOVE 10577'. IN PROGRESS.D
[Frac-Refrac]
03/18/04 CLOSED BAKER CMPA SLIDING SLEEVE @ 129731 RKB. TESTED TBG 3000 PSI,
GOOD. IN PROGRESSD
[Frac-Refrac]
03/19/04 SET 1" SPARTEK GAUGE @ 128851 RKB. TESTED TBG 3000 PSI, IA TO 3500 PSI,
GOOD TESTS. PULLED 2.81" XN CAT SV @ 13117' RKB. SET 2.81" FRAC SLEEVE @
2327' RKB.D
[Frac-Refrac]
03/20/04 PUMP A FRACTURE TREATMENT ON ALPINE CD2-37. BREAKDOWN 100 BBLS,
PAD290 BBLS, STEP RAMP FROM 2 PPG TO 6 PPG IN 1872 BBLS PUMP 153 BBL
FLUSH. JOB FLUSHED TO COMPLETION, TSO @ 60 MINUTES INTO JOB. 313,124 #
16/20 PUMPED, 1500 # LEFT IN WELLBORE 7.6 PPG IN PERFS.
03/23/04 PULLED FRAC SLEEVE @ 2327' RKB; DRIFTED TBG W /2.80" GR TO 13,1171 RKB, IN
PROGRESS.D
[GLV]
03/24/04 PULLED 1" SPG & SET 1" OV @ 12,8831 RKB, PERFORMED CLOSURE TEST ON SSSV
@ 2327' RKB, PASSED & IN SERVICE. D
[Frac-Refrac, GL V]
04/01/04 DRIFTED TBG W/ 2.80 GR TO 13,117' RKB, IN PROGRESS. D
[GLV]
04/03/04 SET CATCHER @ 13,1171 RKB, PULLED DV @ 10,2961 RKB, JOB IN PROGRESS. D
[GLV]
04/04/04 SET GL V DESIGN AS PER PROCEDURE. TESTED SSSV @ 23271 RKB AGAIN,
PASSED CLOSURE TEST & IN SERVICE.D
[GLV]
)
)
Conoc~hillips
February 26, 2004
Mr. Tom Maunder
Alaska Oil and Gas Commission
333 West 7th Ave. Suite 100
Anchorage, AK 99501
Dear Mr. Maunder:
Enclosed please find additional information for Sundry approval concerning a fracture
stimulation for well CD2-37 (PTD 202-211). The attachment includes material
requirements and outlines the steps to be taken during the treatment.
Please call Cliff Crabtree (265-6842) or myself at 265-6958 if you have any questions.
Sincerely,
~?- ~ ;tt~~ -
Guy Schwartz
Wells Engineer
Attachment
RECEIVED
FES 2 6 2004
Alaska Oil & Gas Cons.. Cmnnlll\~ion
¡(\r¡rhorags
)
)
ConocóPhiUips
February 23, 2004
Mr. Tom Maunder
Alaska Oil and Gas Commission
333 West 7th Ave. Suite 100
Anchorage, AK 99501
Dear Mr. Maunder:
Enclosed please find a 10-403 Application for Sundry Approval for ConocoPhillips
Alaska, Inc. well CD2-37 (PTD 202-211). The request regards a fracture stimulation on
the mentioned well in the Alpine field.
Please call Cliff Crabtree (265-6842) or myself at 265-6958 if you have any questions.
Sincerely,
~2Ç36
Wells Engineer
Attachments
RECEIVED
FEe 2 5 2004
Alaska Ojl & F C
Jas OOS, Commlssìon
Anchorage
ORtG\NAL
) )- ~f
ALASKA OIL AND ~"':;~~:SAE~;:-:';ON COMMISSIO~ E C E IVE ~, e>l,.
APPLICATION FOR SUNDRY APPROVAL 2 5 2004 ~~:
20 AAC 25.280 rEB ~
Operation Shutdown 0 PerforA~&;¡~Oi¡& Gas C'fflr~n'{;(Jm~Slørrnular Disp. 0
Plug Perforations 0 Stimulate 0 ¡4rifj"9~Sion D Other 0
Perforate New Pool 0 Re-enter Suspended Well 0
1. Type of Request:
D
D
D
Suspend 0
Repair well D
Pull Tubing D
Abandon
Alter casing
Change approved program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 36' / AMSL 53'
8. Property Designation:
ADL 380075 & 380077
11.
Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft):
17085' 7296' 17085'
Casing Length Size
CONDUCTOR 114' 16"
SURFACE 3043' 9-5/8"
PRODUCTION 141 09' 7"
OPEN HOLE 2923' 5-1/2"
Perforation Depth TVD (ft):
Perforation Depth MD (ft):
open hole
Packers and SSSV Type:
Baker SAB-3 pkr
SSSV= SSSV
12. Attachments: Description Summary of Proposal 0
Detailed Operations Program 0 BOP Sketch D
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
March 15,2004
Date:
5. Permit to Dr~mber:
202-211
6. API Number: V
50-103-20434-00
9. Well Name and Number:
CD2-37
10. Field/Pool(s):
Colville River Field / Alpine Oil Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth TVD (ft): Plugs (measured): Junk (measured):
7296'
MD
4. Current Well Class:
Development 0
Stratigraphic D
Exploratory D
Service D
114'
3096'
TVD
114'
Collapse
Burst
14162'
17085'
2382'
7295'
7296'
Tubing Size:
4-1/2" / 3-1/2"
Tubing Grade:
L-80
Tubing MD (ft):
13148'
Packers and SSSV MD (ft)
set @ 13062'
SSSV= 2327'
13. Well Class after proposed work:
Exploratory D Development 0
15. Well Status after proposed work:
Oil 0 Gas D
WAG D GINJ D
Service D
Plugged D
WINJ 0
Abandoned D
WDSPL D
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Mike Mooney
Signature 1frjtt, ~ 6wEL FoiL MIKE tVllb.l£'-I
Commission Use Only
Contact: Guy Schwartz @ 265-6958
Title: Wells Group Team Leader
Phone ZlPS-ld5ZV Date Z/z4J01
Sundry Number:
301- ¿)tJ-7
Conditions of approval: Notify Commission so that a representative may witness
Location Clearance 0
Plug Integrity D BOP Test 0
Mechanical Integrity Test D
Other:
Approved by:
¡~j\;.~\~~
l""nn.~.
BY ORDER OF
COMMISSIONER THE COMMISSION
ORIGINAL
af (,1
Date:
SUBMIT IN DUPLICATE
)
)
ConocoPhillips Alaska, Inc.
Alpine Well CD2-37
PTD 202-211
Sundry Notice 10-403 Request
From: Guy Schwartz (CPAI)
Date: 2-24-04
To: Tom Maunder
Subject: CD2-37 Fracture Stimulation
Overview:
CD2-37 was completed 11/28/2002 as an openhole horizontal well and has produced briefly at rates
(-400 SOPD) to low to remain online. The productivity of CD2-37 is too low to enable continuous
production into the common line gathering system. Approximately 3.1 MM barrels (gross) of reserves
are at risk if the well remains shut-in. It is therefore requested that CD2-37 be fracture stimulated
to capture these reserves at risk.
Assumptions:
* CD2-37 will not be returned to production without rate enhancement. This will result in loss of
pattern reserves in excess of 3.1 MM barrels (gross)
* Injectors have been drilled to provide pattern pressure support to CD2-37. That said, given the
changing depositional environment on the southern periphery, it must be recognized that continuity
across pattern distances is not assured. We know that CD2-37 was found to be pressure depleted
when drilled which confirms some continuity to the Alpine sands being produced in the core area of
the field.
* This is the first horizontal fracture stimulation on an Alpine producer. There is some degree of
uncertainty as to the outcome and ultimate success of the stimulation.
The preliminary fracture stimulation design calls for placing 310,000 Ibs of 16/20 into the formation. A
detailed stimulation procedure is currently being developed for this well.
Please call me if you have any questions or comments on this procedure.
)
)
CD2-37 Fracture Stimulation Procedure
FRACTURE TREATMENT:
OBJECTIVE: Create a co-linear frac in the open hole section of the Alpine C sand.
1. MIRU clean insulated frac tanks. Load tanks with diesel (approximately 2500 bbls are required for the
treatment)
2. Rig up Dowell equipment and stab Tree Saver
3. Pressure test surface lines to 9500 psi
4. Pump the 100 bbl Breakdown with Dowell's YFGOIII fluid. Bring pumps up to maximum rate ASAP.
5. Pump the following schedule at 30 BPM with a maximum pressure of 9000 psi, add breaker as per lab
results.
.
285 bbls YFGOIII Pad
260 bbls YFGOIII wi 2 ppa 16/20 Carbolite
560 bbls YFGOIII wi 4 ppa 16/20 Carbolite
1050 bbls YFGOIII wi 6 ppa 16/20 Carbolite
150 bbls Slick Diesel flush
.
.
.
.
6. Monitor the surface pressure fall-off at the end of the job for 30 min if the well does not screen out.
7. Rig down equipment, move off location
8. FCO if required with slick diesel
Material requirements:
2500 bbls diesel (inclusive'of bottoms)
. 1950 bbls YFGOIII (8 gpt J452 + 8 gpt J601/J602)
. 150 bbls slick diesel (J452 + J601)
. 150 Ibs J603 Breaker
310,000 pounds 16/20 Carbolite
Æ!\ )
.. ConocoPhillips Alaska.líï~,
CD2~37
)
, ALPINE
CD2-37
.'~..J\I API: 501032043400 Well Type: PROD Angle @ TS: deg @
SSSV Type: TRDP Orig 11/28/2002 Angle @ TD: 94 deg @ 17085
TUBING Completion:
(124-13148. Annular Fluid: Last W/O: Rev Reason: Format Update
Reference Log: RKB 36 Ref Log Date: Last Update: 11/25/2003
OD:3.500, Last Tag: TD: 17085 ftKB
ID:2.992) Last Tag Date: Max Hole Angle: 94 deg @ 17085
HODUCTION
(0-14162.
OD:7.OQO.
Wt26.00)
SLEEVE-C
(12973-12974,
OD:5.325)
PACKER
(13062-13063,
OD:5.970)
NIP
(13117-13118,
OD:3.750)
WLEG
(13147-13148,
OD:5.0(0)
OPE N HOLE
(14162-17085
OD6125
I
I
!I
'¡.
.
I
.
..: .'1
.
'.'
.!
:11
:':~ -!
.
I,
1.r...
~ . ~: ;.¡::~ ¡
!
I I
-I
. . I
. I
. .
I A
',I
.Casing String- ALL STRINGS
Description
CONDUCTOR
SURFACE
PRODUCTION
OPEN HOLE
Tubing String - TUBING
Size Top
4.500 0
3.500 124
Gas Lift MandrelsNalves
St MD TVD Man Man Type V Mfr V Type V OD Latch Port TRO
Mfr
1 5365 3416 CAMCO KBG-2
2 10296 5714 CAMCO KBG-2
3 12883 6936 CAMCO KBG-2
Other (plugs, equip., etc.) - JEWELRY
Depth TVD Type
33 33 HANGER FMC 4.5" TUBING HANGER
124 124 XO
2327 2013 SSSV
12973 6979 SLEEVE-C
ID
3.500
3.500
2.812
2.812
Size
16.000
9.625
7.000
6.125
Top Bottom TVD Wt Grade Thread
0 114 114 109.00 H-40 WELDED
0 3096 2382 36.00 J-55 BTC
0 14162 7295 26.00 L-80 BTCM
14162 17085 17085 0.00
TVD Wt Grade Thread
124 12.60 L-80 8RD
7060 9.30 L-80 EUEMOD
Bottom
124
13148
GLV
GLV
OV
Date
Run
BK 0.188 1637 5/13/2003
BK 0.250 1751 5/13/2003
BK 0.188 0 5/14/2003
Vlv
Cmnt
1.0
1.0
1.0
Description
CAMCO TRM-4E SCSSV
BAKER CMPA SLIDING SLEEVE. CLOSED 12/9/02 (shift down to close/up
to open)
BAKER SAB-3 PACKER W/MILLOUT EXTENSION
HES 'XN' NIPPLE WINO GO PROFILE
BAKER WIRELlNE GUIDE
3.875
2.750
3.875
13062 7021 PACKER
13117 7046 NIP
13147 7060 WLEG
General Notes
Date Note
11/25/2002 TREE: FMC 41/16 5K
TREE CAP CONNECTION: 7" OTIS
12/10/2002 ABLE TO PASS DOWN TO 13625 W/2.60" G-RING
')
ConocóPhillips
)
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
October 7, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Addendum to the Well Completion Report for CD2-37 (APD 202-211)
Dear Commissioner:
This is an addendum to the Well Completion Report previously submitted for the
Alpine well CD2-37. We have recently brought the well on-line and have a
representative well test. The date of first production was 5/20/03, the date of the test
is 10/5/03, total length of the test was 2.5 hours, oil rate is 440 stb/d, water is 0 stb/d,
gas is 899 mscf/d, GOR is 864, choke is 75010, flow tubing pressure is 271.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
;<1- C. CK (,9h(o~
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCA/skad
,'. I).
I'" ,.-'
RBDMS BFl
OCT 0 {j 2003
"}
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
ConocJP'hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
July 14, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for CD2-37 (APD 202-211)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
drilling operations on the Alpine well CD2-37. The well is shut-in and a
representative well test will be sent at a later time.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
,4_L- OIZ
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCA/skad
JUL 1. 5 2003
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged D Abandoned D Suspended D WAG D 1b. Well Class:
20AAC 25.105 20AAC 25.110 Development 0 Exploratory D
No. of Completions - Other - Service D Stratigraphic Test D
5. Date Comp., Susp., .,; 12. Permit to Drill Number:
or Aband.: November 28, 2002 202-211 /
6. Date Spudded: / 13. API Number:
November 4, 2002 50-103-20434-00
7. Date TD Reached: 14. Well Name and Number:
1a. Well Status: Oil 0
Gas U
GINJ D
2. Operator Name:
WINJ D
WDSPL D
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface:
At Top Productive
Horizon:
1934' FNL, 1519' FEL, Sec. 2, T11 N, R4E, UM
2487' FNL, 1457' FEL, Sec. 14, T11 N, R4E, UM
Total Depth:
26' FNL, 30' FWL, Sec. 24, T11 N, R4E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 371719 y-
TPI: x- 371602 y-
Total Depth: x- 373036 y-
18. Directional Survey: Yes 0 NoU
Zone- 4
Zone-4
Zone-4
5974423
5963312
5960467
21. Logs Run:
GR/Res, Acoustic Caliper
22.
November 25, 2002
8. KB Elevation (ft):
RKB 36' / 52.7' AMSL
9. Plug Back Depth (MD + TVD):
17085' MD / 7298' TVD
10. Total Depth (MD + TVD):
17085' MD / 7298' TVD
CD2-37
15. Field/Pool(s):
Colville River Field
Alpine Oil Pool
16. Property Designation:
ADL 380075 & 380077
11. Depth where SSSV set:
2327' feet M D
17. Land Use Permit:
ALK
19. Water Depth, if Offshore:
N/A feet MSL
20. Thickness of
Permafrost:
1694' MD
CASING SIZE
GRADE
B
J-55
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 115'
Surface 3096'
Surface 14162'
16"
WT. PER FT.
62.5#
36#
26#
9.625"
7"
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
open hole completion from 14162' - 17085' MD
HOLE SIZE
AMOUNT PULLED
42"
CEMENTING RECORD
Pre-Installed
12.25"
520 sx AS III Lite, 230 sx Class G, Top Job(500 sx AS 1, 180 sx AS Lite)
54 bbls Class G
8.5"
24.
TUBING RECORD
DEPTH SET (MD)
13148'
PACKER SET (MD)
13062'
SIZE
4.5"
25.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
N/A
26.
Date First Production
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Shut-in
GAS-MCF
Date of Test
Production for OIL-BBL
Hours Tested
Flow Tubing
Test Period -->
Calculated
OIL-BBL
Casing Pressure
W A TER-BBL
GAS-OIL RATIO
CHOKE SIZE
GAS-MCF
OIL GRAVITY - API (carr)
W A TER-BBL
press. psi 24-Hour Rate ->
27. CORE DATA r:, ~L:'~'
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessjfy'"). p,.,,,~ t,.
Submit core chips; if none, state "none",
~ ¡. ;--'-' ~
; / (it-pi:
¡ V~F~;¡r.'.:.; J
l--)l,~~«;:
NONE
jUL 1 5 2D03
R8DMs BF,l
1J~r
CONTINUED ON REVERSE SIDE
Form 10-407 Revised 2/2003
JtJt 2 I 201JJ
Submit in duplicate
ORIG NA-
28.
')
29.
)
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
CD2-37
Seabee Form.
Nanushuk
Gamma Ray Shale
Kalubik
Kuparuk Form.
Miluveach
3131.5' 2398'
6198.5' 3823'
12630' 6811'
12988' 6986'
13078' 7028'
13173' 7071'
13642.5' 7225'
13894' 7267'
n/a n/a N/A
n/a n/a
17085' 7298'
Top Alpine D
Top Alpine C
Alpine A
Base Alpine
TD
JUl 1 [£
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact:
Vern Johnson 265-6081
Printed Name C. Alvord
Signature Þ t: ~
Title:
Phone
Alpine Drilling Team Leader
Date
., ( ,+-( () ,
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 29: List all test information. If none, state "None".
OR\G\NAL
Item 27: If no cores taken, indicate "none".
Form 1 0-407 Revised 2/2003
')
)
Page 1 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
Date
Sub
From - To Hours Code Code Phase
11/3/2002
10.50 MOVE MOVE MOVE
08:00 - 18:30
18:30 - 21 :00 2.50 MOVE RURD RIGUP
21 :00 - 00:00 3.00 DRILL PULD SURFAC
11/4/2002 00:00 - 01 :00 1.00 DRILL SFTY SURFAC
01 :00 - 15:30 14.50 DRILL DRLG SURFAC
15:30 - 16:00 0.50 DRILL CIRC SURFAC
16:00 - 18:00 2.00 DRILL TRIP SURFAC
18:00 - 19:30 1.50 DRILL PULD SURFAC
19:30 - 20:30 1.00 DRILL TRIP SURFAC
20:30 - 21 :30 1.00 DRILL REAM SURFAC
21 :30 - 00:00 2.50 DRILL DRLG SURFAC
11/5/2002 00:00 - 12:00 12.00 DRILL DRLG SURFAC
12:00 - 18:00
18:00 - 18:30
6.00 DRILL DRLG SURFAC
0.50 DRILL CIRC SURFAC
18:30 - 21 :00
2.50 DRILL DRLG SURFAC
21 :00 - 23:00 2.00 DRILL CIRC SURFAC
23:00 - 00:00 1.00 DRILL WIPR SURFAC
11/6/2002 00:00 - 01 :30 1.50 DRILL WIPR SURFAC
01 :30 - 05:00 3.50 DRILL WIPR SURFAC
05:00 - 06:00 1.00 DRILL TRIP SURFAC
06:00 - 08:00 2.00 DRILL TRIP SURFAC
08:00 - 09:00 1.00 DRILL TRIP SURFAC
09:00 - 10:00 1.00 DRILL TRIP SURFAC
10:00 - 11 :00 1.00 DRILL TRIP SURFAC
11 :00 - 12:30 1.50 DRILL PULD SURFAC
12:30 - 16:30 4.00 DRILL TRIP SURFAC
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
Move rig from CD2-13 to CD2-37. Spot and level rig. Jack floor into
place and install electrical house on sub base. Fix boots in pipeshed.
Replace seals on topdrive grabs. Spot motor and pit complexes.
Install safety equipment and electrical line to subbase.
Nipple up riser, flowline, turnbuckles, mousehole, drainlines, service
lines. Take on spud mud
P/U BHA #1 bit, motor wI 1.5 deg bend, pony collar, stab, MWD. Adjust
motor and orient. P/U UBHO and stand dc's from derrick
Hold prespud meeting and test surface equipment to 3000 psi-OK
Drill and gyro survey from 115' to 1074' TVD=1062'. ART=2.5,
AST =6.9, ADT =9.4 MWD failed-unable to measure angle
Circ and condition mud-hole static
Pump out of hole from 1074' to 708' Blowdown topdrive. POOH to
514'. Hit tite spot-20K over. Pumpout from 514' to 263' POOH to 174'
STand bak 1 stand of d.c.'s UD float sub and UBHO-Drain motor
Change out MWD and reorient. M/U float sub and UBHO and 1 satand
d.c.'s
RIH from 174' to 370'. Ream tite spot and RIH to 802'
Wash and ream from 802' to 1074'
Drill from 1074' to 1290' TVD=1260', ADT=1.8, AST=1.3, ART=.5
Directionally drill 12 1/4" hole fl 1290' to 2501' MD 2022' TVD
RPM - 70 WOB - 25- 30 k GPM - 630 @ 2220 psi
String wt. 140 up 120 down 130 rot.
Torque on loff 9000 I 8000 ft. Ibs.
ADT- 8.21 hrs. ART- 4.6 hrs AST- 3.61 hrs.
Directionally drill 12 1/4" hole fl 2501' to 2909'.
Drilll string packed off. Lost circulation. Established circulation with full
returns. Circlate bottoms up. Build pit volume.
Directionally drill 12 1/4" hole fl 2909' to 3105' MD 2386' TVD
RPM - 70 WOB - 35- 40 k GPM - 588 @ 2210 psi
String wt. 140 up 120 down 130 rot.
Torque on loff 9500 18000 ft. Ibs.
ADT - 6 hrs. ART - 5 hrs AST - 1 hrs.
Pump sweep. Stage out of hole while circulating. Blow down top drive.
Monitor well.
POH for wiper trip to 1961'.
Continue wiper trip f/1961' to 1763' pulling tight fl 1790' to 1763' - 75k
over
Pump & back ream fl 1763' to 914' - attempt to RIH stacked out @ 960'
- unable to work past 960'
POOH fl 960' - stand back HWDP in derrick
Stand back 8" DC's - LD MWD, motor & bit
MU 121/4" HO assembly - RIH to 192' - break circ.
RIH to 339' - stacked out - attempt to work through - unable to work HO
past 339' -
POOH - LD hole opener assembly
MU BHA #4 - bit, motor, MWD-
RIH to 365' tag up - work through spots @ 365',450' to 475'
Observed large amount of wood & sand at shale shakers while working
through spots @ 365' to 475' - rotate down to 480'
Directional driller concerned of possible sidetrack - Orient motor & slide
fl 475' to 507' - still in origanial hole
Wash & ream fl 507' to 786' - RIH wlo pumps to 873'
Printed: 12/5/2002 11 :03: 12 AM
)
)
ConocoPhillips Alaska
Operations Summary Report
Page 2 of 9
Legal Well Name: CD2-37
Common Well Name: CD2-37 Spud Date: 11/3/2002
Event Name: ROT - DRILLING Start: 11/2/2002 End:
Contractor Name: Doyon Rig Release: Group:
Rig Name: Doyon 19 Rig Number: 19
Date From - To Hours Code Sub Phase Description of Operations
Code
11/6/2002 12:30 - 16:30 4.00 DRILL TRIP SURFAC Wash & ream spots @ 837' to 930' - RIH wlo pumps to 965'
16:30 - 17:30 1.00 DRILL TRIP SURFAC RIH fl 965' to 1437'. Tight from 1183' to 1195'. 20k to 40k drag. No
returns.
17:30 - 18:30 1.00 DRILL CIRC SURFAC Circulate hole clean at 110 rpms and 450 gpm. (Observed excessive
amount of sand and small gravel with some wood at shakers)
18:30 - 00:00 5.50 DRILL TRIP SURFAC Attempt to RIH. Drill string taking wt and no returns. Wash and ream
from 1437' to 2863'.
11/7/2002 00:00 - 01 :00 1.00 DRILL REAM SURFAC Continue washing & ream fl 2862' to 3105' TD
RPM 110 504 GPM @ 1660 psi
01 :00 - 02:00 1.00 DRILL CIRC SURFAC Circulate hole clean RPM 110 588 GPM @ 2250 psi
02:00 - 03:00 1.00 DRILL TRIP SURFAC POOH f/31 OS' to 2753' - started pulling 23 to 35 k over fl 2890' to 2753'
03:00 - 03:30 0.50 DRILL REAM SURFAC Wash & ream back to 3105'
03:30 - 04:00 0.50 DRILL CIRC SURFAC Circulate & weight up fl 9.8 ppg to 10.0 ppg
04:00 - 09:00 5.00 DRILL TRIP SURFAC POOH fl 3105' to 2640' - pump out fl 2640' to 2545' - Cont. POOH fl
2545' to 1114' - pulling 50 to 75 k over every 30' (tool jts.)
09:00 - 10:00 1.00 DRILL TRIP SURFAC Lost pipe movement going down - Work pipe - attempt to circulate-
packed off - worked pipe - regained circulation and movemnet down
10:00 - 12:00 2.00 DRILL TRIP SURFAC Continue POOH working through tight hole - pulling 50 to 60 k over fl
1114' to 990'.
12:00 - 16:00 4.00 DRILL TRIP SURFAC Work tight hole from 990' to 926'.25 to 60k over wt. Ream tight hole
from 965' to 900. Small amount wood and sand accross shakers.
16:00 - 17:30 1.50 DRILL TRIP SURFAC POH. Std back HWDP.
17:30 - 19:00 1.50 DRILL TRIP SURFAC Std back drill collars and LD BHA.
19:00 - 20:30 1.50 CASE RURD SURFAC RU to run 9 5/8. csg. Held PJSM.
20:30 - 22:00 1.50 CASE RUNC SURFAC RIH w/9 5/8. csg to 902'. Work through tight spot at 502'.
22:00 - 00:00 2.00 CASE RUNC SURFAC Circ and work through tight spot from 902' to 998'.
11/8/2002 00:00 - 04:30 4.50 CASE RUNC SURFAC Continue running 9 5/8. casing - work casing through tight hole fl 998'
to 1036' - unable to work past 1 036'
04:30 - 10:00 5.50 CASE OTHR SURFAC RU - pull & LD 25 jts. 9 5/8. 36# J-55 BTC casing - recovered all of bow
spring cent.
10:00 - 11 :30 1.50 CASE OTHR SURFAC RD fill up tool & casing equipt. - RU 4. evelators & short bails
11 :30 - 12:30 1.00 DRILL PULD SURFAC MU Hole opener assembly
12:30 - 14:00 1.50 DRILL TRIP SURFAC RIH wI HO assembly to 917' tagged up - wash & ream f/912' to 1194'
60 RPM 120 SPM @ 820 psi
14:00 - 15:00 1.00 DRILL TRIP SURFAC RIH wlo pump or rotary f/1194' to 1534' tagged up - pulled up to 1480' -
wash & ream fl 1480' to 1574'
15:00 - 15:30 0.50 DRILL CIRC SURFAC Circulate bottoms up @ 1574' - minual amout of sand across shakers
15:30 - 17:30 2.00 DRILL TRIP SURFAC Continue RI H wI HO assembly to 1655' - tag up - pull up to 1574' -
wash & ream f/1574' to 1669' - RIH f/1669' to 3105'. Ream tight spots
at 1655', 1921' and 2453'.
17:30 - 19:00 1.50 DRILL CIRC SURFAC Circ and condition mud.
19:00 - 23:00 4.00 DRILL TRIP SURFAC Monitor well. Attempt to POH. Tight at 3085'. Circ at 630 gpm wi 130
rpms. Pump out to 917'. RIH. Took wt at 1318'. Wash to 1384'.
23:00 - 00:00 1.00 DRILL CIRC SURFAC Circ 2 bottoms up. Spot 140 bbls 10.5 45 ppb gel pill.
11/9/2002 00:00 - 02:00 2.00 DRILL TRIP SURFAC POOH f/1384' - work through tight spot F 1343' to 1240'
02:00 - 03:00 1.00 DRILL TRIP SURFAC Std. back HWDP & 8. DC's - LD stab & hole opener
03:00 - 04:00 1.00 CASE OTHR SURFAC RU to run 9 5/8" casing - PJSM
04:00 - 20:30 16.50 CASE RUNC SURFAC Run 9 5/8. 36# J-55 BTC casing - BakerLoc first 4 jts. - check floats -
RIH wi casing to 1440' - string took wt. - work casing through tight hole
f/1440'to 1694' - Wash & work casing down f/1694' to 1746' - Work
casing down f/1746' to 1975' wlo pump - Wash & work casing down fl
1957' to 3096'. Land csg. Ran 72 jts. total
Printed: 12/5/2002 11 :03: 12 AM
')
)
Page 3 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
Date
Sub
From - To Hours Code Code Phase
11/9/2002
0.50 CASE RURD SURFAC
3.00 CASE CIRC SURFAC
2.00 CEMENTCIRC SURFAC
20:30 - 21 :00
21 :00 - 00:00
11/10/2002 00:00 - 02:00
02:00 - 04:30
2.50 CEMENT PUMP SURFAC
04:30 - 05:30
05:30 - 06:00
06:00 - 07:30
07:30 - 09:00
09:00 - 17:30
1.00 CEMENT PULD
0.50 CEMENTOTHR
1.50 DRILL PULD
1.50 RIGMNT RSRV
8.50 CEMENTTOPJ
SURFAC
SURFAC
SURFAC
SURFAC
SURFAC
17:30 - 20:30 3.00 CEMENTTOPJ SURFAC
20:30 - 21 :30 1.00 CASE NUND SURFAC
21 :30 - 23:30 2.00 WELCTL NUND SURFAC
23:30 - 00:00 0.50 WELCTL OTHR SURFAC
11/11/2002 00:00 - 05:30 5.50 WELCTL BOPE SURFAC
05:30 - 08:00
2.50 CEMENTTOPJ SURFAC
08:00 - 14:00 6.00 DRILL PULD SURFAC
14:00 - 17:00 3.00 DRILL PULD SURFAC
17:00 - 20:00 3.00 DRILL PULD SURFAC
20:00 - 20:30 0.50 CEMENT COUT SURFAC
20:30 - 21 :00 0.50 DRILL CIRC SURFAC
21 :00 - 22:00 1.00 CASE DEQT SURFAC
22:00 - 22:30 0.50 DRILL OTHR SURFAC
22:30 - 00:00 1.50 CEMENT DSHO SURFAC
11/12/2002 00:00 - 01 :30 1.50 CEMENT DSHO SURFAC
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
RD fill up tool. MU cement head and circ equipment.
Circ and condition mud for cement job at 6 bpm. No losses.
Circulate & condition mud & clean hole for cement job
256 GPM @ 340 psi - recip. pipe
PJSM - Cement 9 5/8" casing - Pumped 40 bbls biozan water wI nut
plug for marker - 5 bbls water - test lines to 2500 psi - drop bottom plug
- pump 50 bbls Mudpush XL spacer @ 10.5 ppg - mix & pump Lead
slurry ASL @ 10.7 ppg mixed @ 7.7 B/M @ 1115 psi final pressure-
observed nut plug marker @ shakers wI 390 bbls lead slurry pumped -
pumped down tub - 410 bbls total slurry vol. - switch over to tail slurry
Class G wI 0.2% D046, 0.3% D065, 2% S001 @ 15.8 ppg - mixed @
5.4 B/M @ 861 psi final pressure - Drop top plug wI 20 bbls water fl
Dowell- switch to rig pumps & displace wI 212 bbls 10.1 ppg mud-
bumped plug wI 600 psi - CIP @ 0428 hrs. - floats held - full returns
until last 42 bbls of displacement - no cement returns to surface
RD cement head & landing jt.
Flush riser & flow line
ND riser & starting head - LD mouse hole
Slip & cut drill line & service top drive
Prep for top job - RU & run 1" Hyrdil pipe to 355' tagged up - RU
cement lines - test - attempt to pump 1" pipe plugged - pull out tubing -
change mule shoes - RIH wI 1" Hydril pipe to 355' - rig up cement lines
- test - pump 173 bbls water to flush fl 355' to surface - mud wt. fl 10.6
ppg to 9.2 ppg - 1.5 b/m @ 700 psi
Pump 82 bbls (500 sx) 15.8 ASI cement and 89 bbls (135 sx) 10.7 AS
Lite. No cement to surface.
NU Unihead. Test metal to metal seal to 1000 psi.
NU BOPE. Install bell nipple and flow line.
Install test plug and fill stack with water.
Test BOPE - Hyril to 250 psi & 3500 psi - pipe rams, blind rams, kill &
choke line valves, choke manifold valves, floor TWI & IBOP valves, top
drve IBOP valves to 250 psi & 5000 psi - perform accumulator closure
test
test witnessed & approved by Chuck Scheve AOGCC
Pull test plug - set wear bushing
PU 1" Hydri pipe & RI 9 5/8" X 16" annulus to 88' GL - tagged up - RU
cement lines - pumped 20 bbls water - mixed & pumped 11 bbls ASL @
10.7 ppg wI cement returns - pumped total of 30 bbls ASL @ 10.7 ppg
wI good cement retunrs to surface - RD cement lines - pull & LD 1"
Hydrill pipe - Job witnessed by Chuck Scheve AOGCC
RU & LD excess 5" drill pipe fl derrick - PU & stand back 39 stds. 4"
drill pipe fl pipe shed
MU 8 1/2" Geo Pilot rotary drilling assembly
PU and RIH wI 4" DP to 2858'. Install CBI every 5th std. Tested MWD
at 2468'
Precautionary wash from 2858' to TOC at 2940'. Clean out cement to
300'.
CBU
Blow down top drive. Test csg to 2500 psi /30 min.
Test Geo Pilot skid to 4200 psi.
Drill out cement and float equipment to 3014'.
Continue drill out shoe track - drill out shoe @ 3096' - clean out rat hole
to 3105' - drill 20' new hole fl 3105' to 3125'
Printed: 12/5/2002 11 :03: 12 AM
')
)
Page 4 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
Date
Sub
From - To Hours Code Code Phase
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
11/12/2002 01 :30 - 02:00 0.50 DRILL CIRC SURFAC Circulate hole clean for F.I.T.
02:00 - 02:30 0.50 DRILL FIT SURFAC RU & perform F.I.T. to 16.0 ppg EMW wI 780 psi wI 9.7 ppg mud - RD
02:30 - 03:00 0.50 DRILL CIRC INTRM1 Change well over to 9.6 ppg LSND mud
03:00 - 03:30 0.50 DRILL OTHR INTRM1 Establish base line ECD data @ 400,500, & 600 gpm wI 80, 115, &
150 rpm
03:30 - 12:00 8.50 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole wI Geo Pilot rotary steerable system fl
3125' to 3978' MD 2761' TVD
RPM-110 GPM-504 WOB-5/15
Torque - onloff 7000 I 8000
String wt. up - 130 dn - 105 rot. - 120
ADT - 7.5 hrs. ART- 7.5 hrs
12:00 - 23:00 11.00 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole fl 3978' to 5066' - ECD running 11.1
double back ream last 2 stds. attempting to lower ECD
23:00 - 23:30 0.50 DRILL CIRC INTRM1 Pump sweep & circuale bottoms up - ECD fl 11.15 to 10.87
23:30 - 00:00 0.50 DRILL DRLG INTRM1 Directionally drill 8 1/2" hole wI Geo Pilot fl 5066' to 5100' MD 3277'
TVD
RPM - 90/130 GPM - 504 WOB - 10/15
Torque onloff 9500 I 8500
String wt. up - 150 dn - 115 rot. - 130
ADT - 8.0 ART - 8.0
11/13/2002 00:00 - 10:00 10.00 DRILL DRLG INTRM1 Drill 8 1/2" hole fl 5100' to 6123' MD 3783' TVD
RPM - 175 WOB - 10/15 GPM - 588 @ 3200 psi
Torque onloff - 10000/8500
String wt. up- 165 dn- 115 rot.- 130
ADT- 6.9 ART- 6.9
Aver. ECD - 11.2
10:00 - 11 :30 1.50 DRILL CIRC INTRM1 Pump sweep & circulate hole clean for wiper trip - pull & stand back 1
std. drill every 15 minutes while circulating f/6123' to 5837'
11 :30 - 14:00 2.50 DRILL WIPR INTRM1 Flow check - static - Wiper trip fl 5837' to 5642' - tight fl 5790' to 5642'
pulling 40k over & swabbing
Pump out fl 5542 to 4585' - 5.5 BPM 60 RPM - Attempt to pull wlo
pump to 4490' - still swabbing - Increase pump rate to 450 gpm @ 120
RPM's ECD climbed fl 11.74 to 12.08 wI 10.3 ppg mud returns @
shakers - RIH to 4585'
14:00 - 15:00 1.00 DRILL CIRC INTRM1
15:00 - 18:30 3.50 DRILL WIPR INTRM1
18:30 - 19:00 0.50 RIGMNT RSRV INTRM1
19:00 - 19:30 0.50 DRILL CIRC INTRM1
19:30 - 21 :00 1.50 DRILL TRIP INTRM1
21 :00 - 22:00 1.00 DRILL REAM INTRM1
22:00 - 00:00 2.00 DRILL DRLG INTRM1
Circulate bottoms up f/4585' - rotate & recip pipe fl 4585' to 4490' - 550
GPM @ 2460 psi wi 120 RPM's - 9.7 ppg mud around - shakers
cleaned up
Attempt to POOH on trip tank fl 4585 to 4391' - still swabbing -
Continue pumping out fl 4391' to 3048'
5.5 GPM @ 820 psi wI 60 RPM's
Change swivel packing
RIH to 3096' - Circ bottoms up - dump 10.2 ppg mud returns
RIH fl 3096' to 6032' - work through two minor tight spots @ 5510' &
5809'
Establish circulation - precautionary wash & ream to 6123' - Circulate
bottoms up prior to drilling ahead - no excessive cutting @ shakers on
bottoms up
Drill 8 1/2" hole wI Geo pilot f/6123' to 6314' MD 3880' TVD
RPM's 140 WOB- 20k 588 GPM @ 3300 psi
Torque onloff 10500/9500
String wt. - up 165 dn 120 rot 145
ADT - 1.10 hrs ART - 1.10 hrs
Printed: 12/5/2002 11:03:12 AM
')
)
Page 5 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
fi)atê
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
........SÜb
Froni..To ' 1jCi)9f$ ......9~dë.-C6ète
Start:
Rig Release:
Rig Number: 19
Spud Date: 11/3/2002
End:
Group:
11/2/2002
11/14/2002 00:00 -12:00
12.00 DRILL DRLG INTRM1
12:00 - 00:00
12.00 DRILL DRLG INTRM1
11/15/2002 00:00 - 00:30 0.50 DRILL DRLG INTRM1
00:30 - 03:00 2.50 DRILL CIRC INTRM1
03:00 - 05:00 2.00 DRILL WIPR INTRM1
05:00 - 08:30 3.50 DRILL WIPR INTRM1
08:30 - 09:30 1.00 DRILL CIRC INTRM1
09:30 - 10:30 1.00 DRILL WIPR INTRM1
10:30 - 15:00 4.50 DRILL TRIP INTRM1
15:00 - 00:00 9.00 DRILL DRLG INTRM1
11/16/2002 00:00 - 12:00
12.00 DRILL DRLG INTRM1
12:00 - 14:30
2.50 DRILL DRLG INTRM1
14:30 - 15:00
15:00 - 17:30
0.50 RIGMNT RSRV INTRM1
2.50 DRILL DRLG INTRM1
17:30 - 19:30
2.00 DRILL CIRC INTRM1
Drill 8 1/2" hole wi Geo Pilot fl 6314' to 7203' MD 4527' TVD
RPM's -160 WOB - 10/15 GPM - 588 @ 2890 psi
Torque - onloff 120001 10500
String wt. - up - 190 dn- 125 rot.- 147
Avg. ECD 10.8 ADT- 7.8 ART- 7.8
Drill 8 1/2" hole wi Geo Pilot fl 7203' to 9109' MD 5170' TVD
RPM's -160 WOB - 15/20 GPM - 588 @ 3140 psi
Torque - onloff 14000/12000
String wt. - up - 220 dn- 125 rot. - 155
Avg. ECD 11.0 ADT-7.3 ART-7.3
Drill 8 1/2" hole wi Geo Pilot fl 9109' to 9194' MD
5209' TVD
Circulate hole clean for wiper trip @ 9194' - Pumping 588 GPM @ 2860
psi wi 140 RPM's - std back 1 std DP every 15 mins. 7 stds. total to
8525'
Wiper trip fl 8525 to 8161' - Pulling tight @ 8161' 35k over - RIH to
8320' - pump out to 8233' - pull to 8061' tight - run back to 8233' - pump
out f/ 8233' to 8044'
Pull on trip tank f/ 8044' to 7372' - woking pipe through various tight
spots pulling 30 to 50k over
Pump out f/ 7372' to 7179'
Circ btms up @ 7274' - working pipe up to 7191' - pumping 588 GPM &
140 RPM's
Continue wi wiper trip - pull out on trip tank fl 7179' to 5933' - 10 to 15
over pull - hole took proper fill
Monitor well - static
RIH fl 5933' to 8234' - Fill pipe @ 7852' - returns fl RIH slowed @
7325' - RIH slow f/7325' Wash & ream fl 8337' to 9194' TD
Drill 8 1/2" hole wi Geo Pilot fl 9194' to 10252' MD 5170' TVD
RPM's - 120/160 WOB - 15/20 GPM - 609 @ 3980 psi
Torque - on/off 14000/15500
String wt. - up - 220 dn- 130 rot. - 160
Avg. ECD 11.1 ADT- 5.6 ART- 5.6
Drill 8 1/2" hole w/ Geo Pilot fl 10,252' to 11510' MD
6274' TVD
RPM's - 165 WOB - 22 GPM's - 571 @ 3830 psi
Torque - on/off 16000/15000
String wt. - up - 245 dn- 130 rot. 170
ADT -7.2 hrs. ART -7.2 hrs.
Drill 8 1/2" hole wi Geo Pilot fl 10510' to 11780' MD
6401' TVD
RPM's - 170 WOB - 15/25 GPM's - 571 @ 3870 psi
Torque - on/off 16500/15500
String wt. - up - 250 dn- 140 rot. 170
ADT -1.4 hrs. ART - 1.4 hrs.
Sevice top drive and IBOP
Drill 8 1/2" hole wi Geo Pilot f/11780' to 12067' MD
6535' TVD
RPM's -170 WOB - 15/25 GPM's - 571 @ 3950 psi
Torque - onloff 16500/15500
String wt. - up - 250 dn- 140 rot. 170
ADT -1.6 hrs. ART - 1.6 hrs.
Circ lo-vis hi-density and hi-vis sweeps. Set back 1 std every 15 mins.
Printed: 1215/2002 11 :03: 12 AM
')
)
Page 6 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
Date
. SUb
rl"öm+To : HöUrs.. Cöde Code Phase
11/16/2002
19:30 - 21 :30 2.00 DRILL WIPR INTRM1
21 :30 - 22:00 0.50 DRILL WIPR INTRM1
22:00 - 22:30 0.50 DRILL CIRC INTRM1
22:30 - 00:00 1.50 DRILL WIPR INTRM1
00:00 - 01 :30 1.50 DRILL WIPR INTRM1
01 :30 - 04:30 3.00 DRILL WIPR INTRM1
04:30 - 05:00 0.50 DRILL CIRC INTRM1
05:00 - 08:00 3.00 DRILL WIPR INTRM1
08:00 - 10:00 2.00 RIGMNT RSRV INTRM1
10:00 - 14:00 4.00 DRILL TRIP INTRM1
14:00 - 14:30 0.50 DRILL CIRC INTRM1
14:30 - 16:00 1.50 DRILL TRIP I NTRM 1
16:00 - 16:30 0.50 DRILL CIRC INTRM1
16:30 - 18:30 2.00 DRILL TRIP INTRM1
18:30 - 20:00 1.50 DRILL CIRC INTRM1
20:00 - 22:00 2.00 DRILL TRIP INTRM1
22:00 - 00:00 2.00 DRILL DRLG INTRM1
11/17/2002
11/18/2002 00:00 - 19:30
19.50 DRILL DRLG INTRM1
19:30 - 22:00 2.50 DRILL CIRC INTRM1
22:00 - 23:00 1.00 DRILL WIPR INTRM1
23:00 - 00:00 1.00 DRILL WIPR INTRM1
11/19/2002 00:00 - 00:30 0.50 DRILL WIPR INTRM1
00:30 - 01 :00 0.50 DRILL CIRC INTRM1
01 :00 - 03:00 2.00 DRILL TRIP INTRM1
03:00 - 03:30 0.50 DRILL WIPR INTRM1
03:30 - 05:00 1.50 DRILL TRIP INTRM1
05:00 - 05:30 0.50 DRILL CIRC INTRM1
05:30 - 08:00 2.50 DRILL TRIP INTRM1
08:00 - 09:00 1.00 DRILL CIRC INTRM1
09:00 - 13:30 4.50 DRILL TRIP INTRM1
13:30 - 14:00 0.50 DRILL CIRC INTRM1
14:00 - 18:00 4.00 DRILL TRIP INTRM1
18:00 - 21 :30 3.50 DRILL PULD INTRM1
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
[)e$criþtidr) bf 9)þ$l"atiqns
Pump out and ream from 11876' to 10912'.
Attempt to POH. Unable to work above 10850'.
Circ for 30 mins while rotate and reciprocate pipe.
Pump and ream from 10826' to 10300'.
Continue wiper trip - pumping out f/ 10,300' to 9960'
POOH on trip tank f/ 9960' to 6601' - worked through tight hole @ 8524'
- 25 to 50k over - proper fill
Pulled tight @ 6601' - Circulate & work pipe f/ 6699' to 6600' - 504 GPM
120 RPM's
Continue POOH on trip tank f/ 6601' to 3048' (inside 9 5/8" casing - hole
in good condition - proper fill - monitor well - static
Slip & cut drill line 60' - service top drive & draw works
RIH f/ 3048' to 6900' Diminished returns. Fill pipe at 2000'.
Circ to balance mud.
RIH f/ 6900' to 8800'.
Fill pipe. Circ to balance mud.
RIH f/ 8800' to 11498'.
Circ and condition mud at 8bpm and 120 rpms for 2/3 of one bottoms
up.
Wash and ream from 11498' to 12067' while displace to new LSND
mud.
Drill 8 1/2" hole w/ Geo Pilot f/ 12067' to 12290' MD
6644' TVD
RPM's - 150 WOB - 15/25 GPM's - 562 @ 3950 psi
Torque - on/off 15500/14500
String wt. - up - 270 dn- 140 rot. 175
ADT -1.9 hrs. ART - 1.9 hrs.
Drill 8 1/2" hole w/ Geo Pilot f/ 12290' to 14173' MD
7297' TVD
RPM's -150 WOB - 15/25 GPM's - 529 @ 3980 psi
Torque - on/off 15500/14500
String wt. - up - 245 dn- 145 rot. 180
ADT -14.6 hrs. ART - 14.6 hrs.
Circ sweep at 529 gpm - 150 rpms. Set back 1 std every 15 mins to
13524' .
Blow down top drive. Flow check. Attemept to POH. 50k over pull at
13500'. Back ream out of hole to 13270'. Lost partial returns.
RIH to 13585'.
RIH from 13585' to 14173' w/ minimal returns
Spot 40 bbl LCM pill and regain full returns
POOH from 14173' to 12885'. Pulling 25k to 50 k over normal string
weight.
RIH to 13024' circ @ 504 gpm 120 rpm's and back ream to 12954'
Check flow. POOH from 12954' to 12473'. Pulling 25k to 50k over.
Circ @ 12568' @ 120 spm, 120 rpm's
POOH from 12568' to 11610'. Pulling 25k to 50k over
CBU @ 11610' 504 gpm, 120 stks, 120 rpm
POOH from 11610' to 5670' lalying down CBI's. Tight spot @ 5670'
unable to work through.
Circ and ream tight spot from 5600' to 5695'
POOH from 5670' to 2700', UD CBl's and check flow-POOH to HWDP
Standback HWDP and NMDC's. Flow MWD tools and download. UD
MWD tools
Printed: 12/5/2002 11 :03: 12 AM
')
)
Page 70f 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
11/19/2002 21 :30 - 22:00 0.50 DRILL OTHR INTRM1
22:00 - 23:30 1.50 CASE RURD INTRM1
23:30 - 00:00 0.50 CASE RURD INTRM1
11/20/2002 00:00 - 00:30 0.50 CASE NUND INTRM1
00:30 - 01 :00 0.50 CASE NUND INTRM1
01 :00 - 02:00 1.00 CASE RURD INTRM1
02:00 - 05:30 3.50 CASE RUNC INTRM1
05:30 - 06:00 0.50 CASE CIRC INTRM1
06:00 - 10:00 4.00 CASE RUNC INTRM1
10:00 - 11 :00 1.00 CASE CIRC INTRM1
11 :00 - 13:00 2.00 CASE RUNC INTRM1
13:00 - 14:00 1.00 CASE CIRC INTRM1
14:00 - 16:30 2.50 CASE RUNC INTRM1
16:30 - 17:30 1.00 CASE CIRC INTRM1
17:30 - 19:30 2.00 CASE RUNC INTRM1
19:30 - 20:00 0.50 CASE RUNC INTRM1
20:00 - 21 :00 1.00 CASE OTHR INTRM1
21 :00 - 22:30 1.50 CASE RUNC INTRM1
22:30 - 23:30 1.00 CASE OTHR INTRM1
23:30 - 00:00 0.50 CASE OTHR INTRM1
11/21/2002 00:00 - 03:00 3.00 CASE OTHR INTRM1
03:00 - 03:30 0.50 CASE CIRC INTRM1
03:30 - 04:30 1.00 CASE OTHR INTRM1
04:30 - 05:00 0.50 CASE RUNC INTRM1
05:00 - 05:30 0.50 CASE RURD INTRM1
05:30 - 09:30 4.00 CEMENTCIRC INTRM1
09:30 - 11 :00 1.50 CEMENT PUMP INTRM1
11 :00 - 13:00 2.00 CEMENT DISP INTRM1
13:00 - 13:30 0.50 CEMENT RURD INTRM1
13:30 - 14:30 1.00 WELCTL NUND INTRM1
14:30 - 16:00 1.50 WELCTL EQRP INTRM1
16:00 - 20:00 4.00 WELCTL BOPE INTRM1
20:00 - 20:30 0.50 WELCTL NUND INTRM1
20:30 - 21 :00 0.50 DRILL PULD INTRM1
21 :00 - 21 :30 0.50 DRILL PULD INTRM1
21 :30 - 00:00 2.50 DRILL PULD INTRM1
11/22/2002 00:00 - 01 :30 1.50 DRILL PULD PROD
01 :30 - 04:30 3.00 DRILL PULD PROD
04:30 - 05:30 1.00 RIGMNT RSRV PROD
05:30 - 08:30 3.00 DRILL TRIP PROD
08:30 - 11 :00 2.50 CEMENT COUT PROD
11 :00 - 12:00 1.00 CASE DEaT PROD
12:00 - 14:00 2.00 CEMENT DSHO PROD
14:00 - 14:15 0.25 DRILL DRLG PROD
14:15 - 15:00 0.75 DRILL CIRC PROD
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
Clear floor and flush stack
CIO rams while RlU Frank's fillup tool. Pull wear ring.
R/U to test 7" casing rams
Test 7" casing rams to 25015000 psi. RID test equipment
Pull test plug and install thin wear bushing
RlU 7" casing equipment
Hold safety meeting and RIH wI 7" 26# L-80 BTCM casing to 3095'
Circulate casing volume @ 4 bpm 230 psi. PU=135k, SO=120k
RIH wI 7" casing to 6812' wI no problems
Circulate casing volume @ 4 bpm 340 psi. PU=205k, SO=130k
RIH wI 7" casing to 8760'-check flow
CBU 4 bpm, 490 psi
RIH wI 7" casing to 11245' wI no problems
CBU 4 bpm 550 psi
RIH wI 7" casing to 13090'
Work tight casing from 13090' to 13172'
UD 1 jt of casing and change out lower section of Frank's fillup tool
PIU 1 jt of casing and work tight pipe to 13182'. PIU 535k, SIO 75k.
UD Frank's fillup tool and blowdown topdrive. R/U circulating swedge
Work tight pipe from SIO 75k to PIU 535k (weights includ block weight)
Work stuck pipe @ 13182'
Free pipe-able to move downhole. Regain circulation @ 1.5 bpm 620
psi
Packed off. Makeup new Fillup tool. RIH to 14126'
PIU landing jt and hanger. Land 7" casing @ 14162'
RID slips and fillup tool. R/U cement head
Break circulation @ 1 bpm-700 psi. Increase rate to 4 bpm-590 psi
Safety meeting wI crews. Mix and pump 5 bbl Arco wash, Test lines to
3500 psi-OK. 15 bbl Arco wash, 50 bbl 12.5 ppg Mudpush XL, dropped
bottom plug, 54 bbl cement @ 15.8 ppg, Dropped top plug and pumped
20 bbl water.
Displaced cement wI 516.9 bbl mud wI rig pump (517.7 calculated)
Bumped plug wI 1800 psi-checked floats-OK
RID cementing equipment
Pull wearring and install packoff-test to 5000 psi
Change pipe rams-Change out topdrive crossovers
RlU and test BOPE to 250/5000psi-RlD test equipment. Jeff Jones wI
AOGCC waived witnessing the test
Install wearring. P/U bails
UD 1 std 8" d.c.'s out of derrick
Change pipe handling equipment over to 4"
P/U BHA. Test AGS. Continue P/U BHA. Adjust motor, orient
Load MWD, P/U BHA and pulse test MWD @ 384'
P/U 123 jts 4" d.p. from shed
Cut and slip 60' drilling line and service rig
RIH to 13939' wI stands from derrick
Cleanout from 13939' to 14029'. CBU @ 4.8 bpm, 1830 psi, 30 rpm
Test casing to 3500 psi form 30 min-OK
Drill float shoe, shoe track, and float shoe
Drill new hole from 14173' to 14190' and lost returns. ART =.2, AST =0
ADT =.2
Attempt to CBU while adding LCM. Losing 240 bbl/hr POOH to shoe
and monitor well while blowing down top drive and mixing LCM pill
Printed: 12/5/2002 11 :03: 12 AM
)
)
Page 8 of 9
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Contractor Name: Doyon
Rig Name: Doyon 19
Date From - To Hours Code Sub Phase
Code
11/22/2002 15:00 - 15:30 0.50 DRILL OBSV PROD
15:30 - 16:30 1.00 DRILL CIRC PROD
16:30 - 17:30 1.00 DRILL REAM PROD
17:30 - 18:30 1.00 DRILL OTHR PROD
18:30 - 20:00 1.50 DRILL CIRC PROD
20:00 - 21 :30 1.50 DRILL OTHR PROD
21 :30 - 23:00 1.50 DRILL CIRC PROD
23:00 - 00:00 1.00 CEMENT FIT PROD
11/23/2002 00:00 - 01 :00 1.00 DRILL CIRC PROD
01 :00 - 04:30 3.50 DRILL CIRC PROD
04:30 - 00:00 19.50 DRILL DRLH PROD
11/24/2002 00:00 - 13:00 13.00 DRILL DRLH PROD
13:00 - 14:30 1.50 DRILL CIRC PROD
14:30 - 19:30 5.00 DRILL DRLH PROD
19:30 - 21 :00 1.50 DRILL CIRC PROD
21 :00 - 00:00 3.00 DRILL WIPR PROD
11/25/2002 00:00 - 04:00 4.00 DRILL CIRC PROD
04:00 - 05:00 1.00 DRILL WIPR PROD
05:00 - 05:40 0.67 DRILL REAM PROD
05:40 - 18:00 . 12.33 DRILL DRLH PROD
18:00 - 21 :00 3.00 DRILL CIRC PROD
21 :00 - 00:00 3.00 DRILL TRIP PROD
11/26/2002 00:00 - 01 :00 1.00 DRILL TRIP PROD
01 :00 - 04:30 3.50 DRILL CIRC PROD
04:30 - 14:00 9.50 DRILL TRIP PROD
14:00 - 17:00 3.00 DRILL TRIP PROD
17:00 - 19:00 2.00 DRILL TRIP PROD
19:00 - 19:30 0.50 DRILL OTHR PROD
19:30 - 20:30 1.00 CMPL TN OTHR PROD
20:30 - 00:00 3.50 CMPL TN PULD PROD
11/27/2002 00:00 - 08:00 8.00 CMPL TN PULD PROD
08:00 - 08:30 0.50 CMPL TN RUNT PROD
08:30 - 13:30 5.00 CMPL TN PULD PROD
13:30 - 14:30
14:30 - 15:30
15:30 - 17:00
17:00 - 19:00
-1.00 CMPL TN NUND PROD
1.00 CMPL TN OTHR PROD
1.50 CMPL TN NUND PROD
2.00 CMPL TN NUND PROD
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
Move mud from ball mill and add LCM while monitoring well
Spot LCM pill @ bit @ 3 bpm
Wash and ream openhole to TD. Losing 240 bph
Monitor well while mixing 40 bbl G-seal LCM pill (20 Ibs/bbl)
Spot LCM pill @ 3 bpm 1160 psi, 30 rp. Final rate 2 bpm @ 2380 psi
Squeezed 7 bbl of LCM pill into open hole in 1/2 bbl increments. Final
squeeze pressure 680 psi ( bled to 410 psi in 4 minutes)
Circ and condition mud @ 4 bpm-2400 psi
Perform FIT to 600 psi @ 7295' TVD w/ 9.5 bbp mud. SI and observed
well for 10 min-Pressure bled to 455 psi. EMW= 11.1 ppg EMW
Safety meeting. Blow down mud lines and mix 40 bbl spacer
Pump 40 bbl spacer and displace hole w/ 8.0 ppg MOBM
Geosteer from 14190' to 15176'. TVD= 7337'. ART =8.1, AST=3.8,
ADT=11.9
Drill from 15176' to 15941'. Unable to turn pipe after connection.
ADT =7.8, AST =2.2, ART =5.6. Torque= 20k ft-Ibs
Stand back one stand circ 15 bbl mineral oil sweep and hibis sweep @
5 bpm, 2400 psi, 110 rpm. Add beads and nut plug and rotate and
reciprocate pipe. Torqued dropped to 19k ft-Ibs
Drill from 15941' to 16322'. ART=1.9, AST=.7, ADT=2.6, TVD=7329'
Torque still 20kk ft-Ibs.
CBU @ 5 bpm, 2380 psi, 110 rpm-check flow
Pump out of hole to shoe
Pump lo-hi vis sweeps. Large amount of cuttings and used LCM on 2
and 3 bottoms up
RIH from 14221' to 16226' w/ no problems
Wash and ream to bottom for safety
Drill from 16322' to 17085'. TVD=7296, ART=7.2, AST=1, ADT=8.2,
Rotary when getting back to bottom 16k ft-Ibs
CBU 3 times. Hole clean. 5 bpm, 2700 psi, 120 rpm
Pump out of the hole to 15180'. 4 bpm, 0 rpm Up wt= 300-325k
Pump out of hole from 15180' to 14221'. 4 bpm, 1700 psi, UP wt
300-315k
Circ and condition mud. Inc wt to 8.4 ppg. Check flow
Pump out of hole from 14221' to 6100', 4 bpm
POOH to HWDP w/o pumping
Stand back HWDP, NMDC, and download MWD. UD stabilizers and
adjust motor
Clear floor
Pull wear ring and R/U tubing tongs. Hold safety meeting
m/u weg, XN nipple, Packer and GLM and RIH w/ 3-1/2" 9.3# L-80
EUE-mod tubing
Continue RIH w/ 3-1/2" tubing
M/U Camco SSSV and attach control line. Test control line to 5000
psi-10 min OK
Finish running 3-1/2" tubing M/U hanger and test control line to 5000
psi. Test metal to metal seal-500 psi. Tubing tail @ 13147.73'. XN
nipple @ 13117'. Packer @ 13061', Sliding sleeve @ 12973', GLM's @
12883', 10296', 5365'. SCSSV @ 2327'
Install two-way check
Clean drip pan R/U and flush stack and vac out
N/D BOPE and C/O top drive saver sub. Prep wellhead
N/U tree-test adapter to 5000 psi-OK. Test tree to 5000 psi-OK. Test
Printed: 12/5/2002 11 :03: 12 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
Page 9 of 9
ConocoPhillips Alaska
Operations Summary Report
CD2-37
CD2-37
ROT - DRILLING
Doyon
Doyon 19
11/2/2002
Spud Date: 11/3/2002
End:
Group:
Start:
Rig Release:
Rig Number: 19
Description of Operations
Date
Sub
From - To Hours Code Code Phase
11/27/2002 17:00 -19:00
19:00 - 19:30
19:30 - 20:00
20:00 - 20:30
20:30 - 21 :30
21 :30 - 22:30
22:30 - 23:00
11/28/2002
23:00 - 00:00
00:00 - 01 :30
01 :30 - 02:30
02:30 - 03:00
03:00 - 03:30
03:30 - 00:00
2.00 CMPL TN NUND PROD
0.50 CMPL TN OTHR PROD
0.50 CMPL TN OTHR PROD
0.50 CMPL TN OTHR PROD
1.00 CMPL TN PCKR PROD
1.00 CMPL TN DEQT PROD
0.50 CMPL TN OTHR PROD
1.00 CMPL TN CIRC PROD
1.50 CMPLTN CIRC PROD
1.00 CMPL TN RURD PROD
0.50 CMPL TN RURD PROD
0.50 CMPL TN RURD PROD
20.50 CMPL TN OTHR PROD
SSSV @ 2327' to 5000 psi-OK!
Vac out tree-hose stuck. Remove master valves and remove hose.
NIU master valves and retest to 5000 psi
Pull two-way check and drop packer setting ball
R/U to circulate
Safety meeting. Test lines to 4500 psi. Circ down tubing to seat ball
Set packer wI 3000 psi. Test tubing to 3500 psi-30 min-OK Test
annulus to 3500 psi-30 min-OK
Bleed pressure to zero. Pressure up annulus to 3300 psi and open
sliding sleeve @ 12973'
Reverse out to displace MOBM wI diesel
Finished displacing tubing and annulus wI diesel
RID displacment manifold
Set BPV
Secure well
UD 4" and 5" d.p. out of derrick. Released rig @ 24:00 hrs. 11/28/02
Printed: 12/5/2002 11 :03:12 AM
0.00 -52.00 0.00 0.00 0.00 E 5974423.05 371719.40 0.00 0.00
114.00 0.00 0.00 62.00 114.00 0.00 N 0.00 E 5974423.05 N 371719.40 E 0.00 0.00
164.00 0.75 240.00 112.00 164.00 0.16 S 0.28 W 5974422.89 N 371719.11 E 1.50 0.01
253.00 2.00 259.00 200.97 252.97 0.75 S 2.31 W 5974422.34 N 371717.08 E 1.48 -0.43
344.00 4.15 262.00 291.84 343.84 1.51 S 7.13 W 5974421.66 N 371712.24 E 2.37 -2.03
432.00 6.75 252.00 379.43 431.43 3.55 S 15.21 W 5974419.76 N 371704.14 E 3.14 -4.03
521.00 7.75 235.00 467.73 519.73 8.61 S 25.10 W 5974414.87 N 371694.16 E 2.65 -4.22
611.00 9.00 221.00 556.78 608.78 17.41 S 34.69 W 5974406.24 N 371684.42 E 2.65 -0.98
737.85 9.55 209.84 681.98 733.98 34.03 S 46.43 W 5974389.82 N 371672.39 E 1.48 8.14
829.70 10.77 206.34 772.39 824.39 48.33 S 54.03 W 5974375.66 N 371664.55 E 1.49 17.18
919.96 11.83 200.17 860.90 912.90 64.57 S 60.97 W 5974359.53 N 371657.34 E 1.78 28.24
1017.27 15.25 189.50 955.51 1007.51 86.56 S 66.52 W 5974337.64 N 371651.41 E 4.34 45.03
1110.81 20.82 187.62 1044.42 1096.42 115.20 S 70.76 W 5974309.08 N 371646.68 E 5.99 68.29
1205.25 23.78 190.05 1131 .79 1183.79 150.59 S 76.31 W 5974273.79 N 371640.53 E 3.28 96.90
1300.72 25.71 192.47 1218.49 1270.49 189.77 S 84.14 W 5974234.75 N 371632.03 E 2.28 127.77
1393.21 29.09 188.36 1300.60 1352.60 231.62 S 91.74 W 5974193.04 N 371623.71 E 4.19 161.10
1491.02 33.16 185.53 1384.31 1436.31 281.79 S 97.78 W 5974142.98 N 371616.81 E 4.42 202.52
1582.06 36.45 183.77 1459.06 1511.06 333.57 S 101.96 W 5974091.27 N 371611.75 E 3.78 246.23
1679.16 39.13 182.20 1535.79 1587.79 392.98 S 105.03 W 5974031.92 N 371607.66 E 2.93 297.19
1776.25 41.87 182.80 1609.61 1661.61 455.97 S 107.79 W 5973968.99 N 371603.82 E 2.85 351 .45
1869.21 44.76 184.20 1677.24 1729.24 519.61 S 111.71 W 5973905.42 N 371598.82 E 3.28 405.75
1966.95 47.70 183.33 1744.85 1796.85 590.03 S 116.33 W 5973835.09 N 371593.00 E 3.08 465.69
2062.49 50.88 182.80 1807.15 1859.15 662.34 S 120.19W 5973762.86 N 371587.90 E 3.36 527.66
2154.43 53.97 183.71 1863.21 1915.21 735.08 S 124.34 W 5973690.20 N 371582.50 E 3.45 589.87
2251.96 55.74 185.47 1919.35 1971 .35 814.57 S 130.73 W 5973610.84 N 371574.75 E 2.34 656.97
2344.78 57.25 184.00 1970.59 2022.59 891.69 S 137.11 W 5973533.83 N 371567.05 E 2.10 722.00
2442.99 59.00 180.37 2022.46 2074.46 975.01 S 140.27 W 5973450.58 N 371562.47 E 3.61 794.01
2537.06 60.53 178.14 2069.84 2121.84 1056.27 S 139.20 W 5973369.32 N 371562.15 E 2.62 866.20
2632.01 61.52 178.98 2115.83 2167.83 1139.30 S 137.11 W 5973286.26 N 371562.82 E 1.30 940.43
2727.38 62.63 177.94 2160.50 2212.50 1223.53 S 134.85 W 5973202.00 N 371563.64 E 1.51 1015.80
2823.04 62.67 177.21 2204.45 2256.45 1308.42 S 131.25 W 5973117.06 N 371565.79 E 0.68 1092.38
2917.91 62.59 177.31 2248.06 2300.06 1392.58 S 127.22 W 5973032.85 N 371568.37 E 0.13 1168.51
3013.37 62.59 178.13 2292.01 2344.01 1477.25 S 123.85 W 5972948.13 N 371570.30 E 0.76 1244.79
3044.59 62.59 179.13 2306.38 2358.38 1504.96 S 123.19 W 5972920.42 N 371570.48 E 2.84 1269.54
3171.19 63.12 180.64 2364.14 2416.14 1617.61 S 122.97 W 5972807.78 N 371568.78 E 1.14 1369.02
3266.89 64.29 180.44 2406.54 2458.54 1703.40 S 123.77 W 5972722.02 N 371566.50 E 1.24 1444.32
3362.62 63.18 179.41 2448.90 2500.90 1789.24 S 123.67 W 5972636.18 N 371565.14 E 1.51 1520.09
3461.24 64.35 180.63 2492.49 2544.49 1877.70 S 123.70 W 5972547.74 N 371563.60 E 1.62 1598.11
3556.92 65.02 180.53 2533.41 2585.41 1964.19 S 124.58 W 5972461.28 N 371561.24 E 0.71 1673.99
3652.80 66.39 180.47 2572.85 2624.85 2051.57 S 125.34 W 5972373.92 N 371558.98 E 1.43 1750.71
3748.09 67.53 178.62 2610.15 2662.15 2139.25 S 124.64 W 5972286.24 N 371558.19 E 2.15 1828.39
3844.10 65.97 177.32 2648.05 2700.05 2227.40 S 121.52 W 5972198.05 N 371559.80 E 2.05 1907.62
3942.76 65.84 177.67 2688.33 2740.33 2317.38 S 117.58 W 5972108.02 N 371562.19 E 0.35 1988.84
4038.38 66.52 176.82 2726.95 2778.95 2404.75 S 113.38 W 5972020.59 N 371564.90 E 1.08 2067.90
4133.84 65.85 175.97 2765.49 2817.49 2491.91 S 107.89 W 5971933.35 N 371568.90 E 1.08 2147.37
4229.56 63.40 172.15 2806.52 2858.52 2577.91 S 98.97 W 5971847.21 N 371576.35 E 4.42 2227.43
4323.38 63.45 170.83 2848.49 2900.49 2660.89 S 86.55 W 5971764.03 N 371587.34 E 1.26 2306.48
4422.48 60.59 171.50 2894.98 2946.98 2747.36 S 73.10 W 5971677.35 N 371599.31 E 2.95 2389.08
4518.05 62.02 170.05 2940.87 2992.87 2830.10 S 59.66 W 5971594.39 N 371611.34 E 2.00 2468.41
4613.22 60.23 174.02 2986.84 3038.84 2912.60 S 48.09 W 5971511.70 N 371621.49 E 4.11 2546.63
4708.74 59.53 178.46 3034.79 3086.79 2995.01 S 42.66 W 5971429.21 N 371625.51 E 4.09 2621.89
4804.75 59.27 182.24 3083.68 3135.68 3077.63 S 43.16 W 5971346.61 N 371623.59 E 3.40 2694.53
4902.82 60.23 181.27 3133.08 3185.08 3162.30 S 45.75 W 5971261.99 N 371619.55 E 1.30 2768.00
4998.34 61.44 181.77 3179.63 3231.63 3245.68 S 47.97 W 5971178.66 N 371615.91 E 1.35 2840.51
5090.09 60.26 182.56 3224.32 3276.32 3325.75 S 50.99 W 5971098.66 N 371611.52 E 1.49 2909.72
5184.92 58.74 185.39 3272.46 3324.46 3407.25 S 56.64 W 5971017.27 N 371604.48 E 3.03 2978.95
5284.78 59.50 184.88 3323.71 3375.71 3492.61 S 64.31 W 5970932.05 N 371595.35 E 0.88 3050.63
5383.68 60.48 185.17 3373.18 3425.18 3577.92 S 71.81 W 5970846.88 N 371586.39 E 1.02 3122.36
5479.36 61.73 184.52 3419.41 3471.41 3661.39 S 78.88 W 5970763.55 N 371577.89 E 1.44 3192.65
5574.89 62.38 184.68 3464.18 3516.18 3745.51 S 85.65 W 5970679.56 N 371569.69 E 0.70 3263.67
5670.41 58.81 183.04 3511.07 3563.07 3828.51 S 91.27 W 5970596.66 N 371562.64 E 4.03 3334.24
5765.79 59.83 182.84 3559.74 3611.74 3910.43 S 95.48 W 5970514.82 N 371557.04 E 1.09 3404.53
5864.69 60.95 182.43 3608.60 3660.60 3996.33 S 99.43 W 5970429.01 N 371551.62 E 1.19 3478.43
http://bizakl./drilling/data/Operations/Alpine/CD2/CD2-37/Daily Logs %26 Surveys/CD2-37 (Final Surveys).xls Page 1 of 6
182.28 4080.33 371546.73 1.11
6053.94 59.89 181.52 3699.73 3751.73 4162.06 S 105.60 W 5970263.40 N 371542.61 E 2.36 3621.73
6151.14 60.39 181.68 3748.13 3800.13 4246.33 S 107.96 W 5970179.19 N 371538.82 E 0.53 3694.95
6246.58 61.23 181.09 3794.67 3846.67 4329.62 S 109.97 W 5970095.95 N 371535.38 E 1.03 3767.48
6339.18 61.31 180.62 3839.18 3891.18 4410.81 S 111.18 W 5970014.79 N 371532.78 E 0.45 3838.53
6440.30 61.82 179.31 3887.34 3939.34 4499.73 S 111.12 W 5969925.88 N 371531.31 E 1.25 3916.99
6536.07 62.77 178.84 3931.86 3983.86 4584.51 S 109.75 W 5969841.09 N 371531.23 E 1.08 3992.42
6631.49 63.05 178.99 3975.31 4027.31 4669.44 S 108.14 W 5969756.14 N 371531.39 E 0.33 4068.10
6725.37 63.44 178.47 4017.58 4069.58 4753.25 S 106.29 W 5969672.31 N 371531.81 E 0.65 4142.91
6825.38 62.57 178.47 4062.97 4114.97 4842.33 S 103.91 W 5969583.21 N 371532.67 E 0.87 4222.61
6920.42 62.10 178.27 4107.10 4159.10 4926.47 S 101.51 W 5969499.04 N 371533.62 E 0.53 4297.96
7016.23 62.70 177.64 4151.49 4203.49 5011.32 S 98.48 W 5969414.15 N 371535.20 E 0.86 4374.24
7111 .55 62.43 177.20 4195.41 4247.41 5095.84 S 94.67 W 5969329.58 N 371537.56 E 0.50 4450.58
7206.78 62.85 178.44 4239.17 4291.17 5180.35 S 91.46 W 5969245.02 N 371539.33 E 1.24 4526.65
7305.50 62.75 178.30 4284.30 4336.30 5268.12 S 88.96 W 5969157.23 N 371540.33 E 0.16 4605.25
7401.04 61.46 179.32 4329.00 4381.00 5352.54 S 87.20 W 5969072.79 N 371540.64 E 1.65 4680.54
7496.60 61.58 180.13 4374.56 4426.56 5436.53 S 86.80 W 5968988.80 N 371539.61 E 0.76 4754.83
7591.98 61.04 181.33 4420.35 4472.35 5520.19 S 87.86 W 5968905.17 N 371537.11 E 1.24 4828.12
7687.47 61.64 180.37 4466.15 4518.15 5603.97 S 89.10 W 5968821.43 N 371534.44 E 1.08 4901.44
7785.67 62.29 180.59 4512.31 4564.31 5690.64 S 89.83 W 5968734.78 N 371532.23 E 0.69 4977.56
7881 .35 62.77 180.47 4556.44 4608.44 5775.53 S 90.62 W 5968649.91 N 371529.99 E 0.51 5052.07
7977.02 62.70 180.81 4600.27 4652.27 5860.57 S 91.57 W 5968564.91 N 371527.59 E 0.32 5126.64
8072.21 61.00 180.22 4645.18 4697.18 5944.49 S 92.32 W 5968481.01 N 371525.40 E 1.87 5200.31
8167.65 61.65 179.82 4690.97 4742.97 6028.23 S 92.35 W 5968397.29 N 371523.93 E 0.77 5274.16
8265.80 62.36 179.12 4737.05 4789.05 6114.89 S 91.55 W 5968310.63 N 371523.26 E 0.96 5350.98
8361.77 62.72 181.08 4781.30 4833.30 6200.04 S 91.70 W 5968225.49 N 371521.65 E 1.85 5426.03
8456.79 63.55 181.75 4824.24 4876.24 6284.77 S 93.79 W 5968140.80 N 371518.10 E 1.08 5499.79
8552.17 64.20 181 .73 4866.24 4918.24 6370.37 S 96.39 W 5968055.26 N 371514.04 E 0.68 5574.07
8647.42 64.50 180.92 4907.47 4959.47 6456.21 S 98.38 W 5967969.47 N 371510.59 E 0.83 5648.86
8744.21 63.05 179.64 4950.24 5002.24 6543.03 S 98.81 W 5967882.67 N 371508.67 E 1.91 5725.24
8840.65 62.03 178.87 4994.71 5046.71 6628.60 S 97.70 W 5967797.1 0 N 371508.32 E 1.27 5801.24
8936.15 61.88 178.30 5039.62 5091.62 6712.86 S 95.62 W 5967712.81 N 371508.96 E 0.55 5876.55
9031.08 62.66 177.92 5083.79 5135.79 6796.84 S 92.85 W 5967628.80 N 371510.29 E 0.90 5951.94
9125.65 63.34 177.88 5126.72 5178.72 6881.04 S 89.76 W 5967544.55 N 371511.94E 0.72 6027.67
9225.19 62.79 179.26 5171.81 5223.81 6969.75 S 87.54 W 5967455.82 N 371512.64 E 1.35 6106.97
9320.37 61.58 182.09 5216.23 5268.23 7053.92 S 88.52 W 5967371.68 N 371510.22 E 2.92 6180.75
9416.08 62.07 181 .35 5261.42 5313.42 7138.25 S 91.05 W 5967287.41 N 371506.24 E 0.85 6253.95
9511.33 62.64 181.93 5305.62 5357.62 7222.59 S 93.47 W 5967203.12 N 371502.39 E 0.81 6327.21
9606.36 63.24 181.57 5348.85 5400.85 7307.17 S 96.05 W 5967118.59 N 371498.35 E 0.72 6400.61
9704.68 63.60 181.57 5392.84 5444.84 7395.07 S 98.46 W 5967030.75 N 371494.44 E 0.37 6477.01
9800.44 62.96 181.24 5435.90 5487.90 7480.58 S 100.56 W 5966945.29 N 371490.88 E 0.74 6551 .45
9895.61 61.57 180.19 5480.19 5532.19 7564.80 S 101.62 W 5966861.09 N 371488.39 E 1.76 6625.25
9991.44 62.09 180.63 5525.43 5577.43 7649.28 S 102.22 W 5966776.64 N 371486.33 E 0.68 6699.49
10086.70 62.64 180.72 5569.61 5621.61 7733.67 S 103.21 W 5966692.28 N 371483.90 E 0.58 6773.46
10184.83 63.94 178.84 5613.72 5665.72 7821.32 S 102.87 W 5966604.64 N 371482.74 E 2.16 6850.94
10279.99 64.49 178.76 5655.12 5707.12 7906.98 S 101.08 W 5966518.96 N 371483.07 E 0.58 6927.35
10375.68 63.33 178.04 5697.20 5749.20 7992.89 S 98.68 W 5966433.02 N 371484.00 E 1.39 7004.26
10471.45 61.95 177.76 5741.21 5793.21 8077.88 S 95.56 W 5966347.98 N 371485.66 E 1.46 7080.71
10566.73 61.11 177.33 5786.63 5838.63 8161.56 S 91.98 W 5966264.26 N 371487.81 E 0.97 7156.21
10661.42 61.38 176.98 5832.18 5884.18 8244.47 S 87.86 W 5966181.29 N 371490.51 E 0.43 7231.29
10758.06 61.75 176.81 5878.20 5930.20 8329.33 S 83.25 W 5966096.36 N 371493.67 E 0.41 7308.31
10850.61 62.26 177.16 5921.64 5973.64 8410.94 S 78.96 W 5966014.70 N 371496.57 E 0.64 7382.33
10949.02 62.70 178.73 5967.12 6019.12 8498.15 S 75.83 W 5965927.44 N 371498.20 E 1.48 7460.73
11042.97 63.04 179.73 6009.96 6061.96 8581.76 S 74.71 W 5965843.83 N 371497.89 E 1.01 7535.01
11139.56 62.98 182.31 6053.80 6105.80 8667.80 S 76.24 W 5965757.82 N 371494.89 E 2.38 7610.19
11232.41 63.45 186.76 6095.66 6147.66 8750.40 S 82.80 W 5965675.35 N 371486.92 E 4.31 7679.97
11330.54 64.02 186.95 6139.08 6191.08 8837.77 S 93.30 W 5965588.17 N 371474.92 E 0.61 7752.09
11425.30 64.56 186.31 6180.19 6232.19 8922.58 S 103.16 W 5965503.55 N 371463.62 E 0.83 7822.26
11524.62 64.57 186.56 6222.85 6274.85 9011.70 S 113.21 W 5965414.60 N 371452.04 E 0.23 7896.14
11617.09 61.79 184.34 6264.57 6316.57 9093.84 S 121.06 W 5965332.62 N 371442.78 E 3.69 7964.90
11711.58 60.26 183.77 6310.34 6362.34 9176.29 S 126.91 W 5965250.28 N 371435.52 E 1.70 8034.88
11808.15 60.40 180.33 6358.16 6410.16 9260.13 S 129.91 W 5965166.50 N 371431.09 E 3.10 8107.42
11903.88 60.83 180.96 6405.13 6457.13 9343.53 S 130.85 W 5965083.12 N 371428.72 E 0.73 8180.55
http://bizak/./drilling/data/Operations/Alpine/CD2/CD2-37/Daily Logs %26 Surveys/CD2-37 (Final Surveys).xls Page 2 of 6
1 61.25 180.13 6450.46 9425.43 131.63 5965001.25 E 0.90 8252.43
12094.54 61.37 178.58 6497.05 6549.05 9510.56 S 130.67 W 5964916.12 N 371426.05 E 1.41 8327.97
12189.97 60.91 180.54 6543.11 6595.11 9594.13 S 130.02 W 5964832.55 N 371425.26 E 1.86 8402.00
12285.59 60.95 180.43 6589.57 6641.57 9677.70 S 130.73 W 5964749.00 N 371423.13 E 0.11 8475.38
12380.88 60.80 178.69 6635.96 6687.96 9760.93 S 130.09 W 5964665.77 N 371422.34 E 1.60 8549.11
12476.39 60.32 178.99 6682.90 6734.90 9844.09 S 128.41 W 5964582.59 N 371422.60 E 0.57 8623.26
12571.80 60.20 178.99 6730.23 6782.23 9926.92 S 126.95 W 5964499.75 N 371422.64 E 0.13 8697.01
12667.51 60.13 179.37 6777.85 6829.85 10009.94 S 125.76 W 5964416.73 N 371422.41 E 0.35 8770.80
12762.55 60.59 179.13 6824.85 6876.85 10092.54 S 124.68 W 5964334.12 N 371422.08 E 0.53 8844.17
12858.10 60.95 178.21 6871.51 6923.51 10175.90 S 122.74 W 5964250.74 N 371422.59 E 0.92 8918.62
12951.75 61.24 177.80 6916.77 6968.77 10257.83 S 119.89 W 5964168.77 N 371424.04 E 0.49 8992.24
13048.85 61.82 177.85 6963.06 7015.06 10343.12 S 116.65 W 5964083.44 N 371425.82 E 0.60 9069.01
13143.77 63.75 175.60 7006.47 7058.47 10427.39 S 111.81 W 5963999.10 N 371429.22 E 2.93 9145.61
13239.50 66.45 173.06 7046.78 7098.78 10513.77 S 103.22 W 5963912.58 N 371436.34 E 3.71 9225.87
13334.85 68.99 170.61 7082.93 7134.93 10601.09 S 90.67 W 5963825.06 N 371447.39 E 3.57 9308.80
13429.25 71.01 167.91 7115.22 7167.22 10688.23 S 74.13 W 5963737.66 N 371462.43 E 3.44 9393.46
13525.78 73.85 165.48 7144.36 7196.36 10777.76 S 52.94 W 5963647.77 N 371482.09 E 3.80 9482.42
13621.20 77.03 162.50 7168.35 7220.35 10866.51 S 27.46 W 5963558.60 N 371506.05 E 4.50 9572.71
13717.29 79.42 158.91 7187.97 7239.97 10955.27 S 3.63 E 5963469.32 N 371535.61 E 4.42 9665.65
13812.49 81.79 156.18 7203.51 7255.51 11042.05 S 39.51 E 5963381.94 N 371570.00 E 3.77 9759.10
113907.97 82.34 153.27 7216.69 7268.69 11127.55 S 79.88 E 5963295.76 N 371608.90 E 3.07 9853.54
14003.79 83.59 152.03 7228.43 7280.43 11212.02 S 123.57 E 5963210.56 N 371651 .14 E 1.83 9948.63
14099.36 84.52 151.80 7238.33 7290.33 11295.88 S 168.32 E 5963125.94 N 371694.45 E 1.00 10043.68
14173.00 84.52 151.80 7245.36 7297.36 11360.48 S 202.96 E 5963060.76 N 371727.98 E 0.00 10116.98
14234.76 87.60 150.98 7249.60 7301.60 11414.57 S 232.46 E 5963006.18 N 371756.55 E 5.16 10178.59
14334.21 88.15 150.46 7253.29 7305.29 11501.25 S 281.07 E 5962918.68 N 371803.67 E 0.76 10277.95
14429.65 86.37 151.89 7257.85 7309.85 11584.76 S 327.03 E 5962834.39 N 371848.19 E 2.39 10373.26
14525.14 87.23 150.80 7263.18 7315.18 11668.43 S 372.74 E 5962749.96 N 371892.47 E 1.45 10468.60
14620.80 86.55 152.42 7268.37 7320.37 11752.45 S 418.16 E 5962665.16 N 371936.44 E 1.83 1 0564.11
14716.33 87.54 152.00 7273.30 7325.30 11836.85 S 462.64 E 5962580.02 N 371979.47 E 1.13 10659.51
14810.62 86.80 156.17 7277.96 7329.96 11921.54 S 503.79 E 5962494.64 N 372019.17 E 4.49 10753.60
14902.00 87.23 155.84 7282.71 7334.71 12004.91 S 540.90 E 5962410.65 N 372054.84 E 0.59 10844.62
15001.84 88.58 155.12 7286.36 7338.36 12095.68 S 582.30 E 5962319.18 N 372094.69 E 1.53 10944.20
15095.62 90.68 159.38 7286.97 7338.97 12182.14 S 618.56 E 5962232.12 N 372129.46 E 5.06 11037.54
15192.07 89.26 158.51 7287.02 7339.02 12272.14 S 653.21 E 5962141.53 N 372162.57 E 1.73 11133.26
15286.84 89.69 158.51 7287.89 7339.89 12360.32 S 687.92 E 5962052.77 N 372195.77 E 0.45 11227.39
15384.17 90.25 155.53 7287.94 7339.94 12449.92 S 725.92 E 5961962.54 N 372232.23 E 3.12 11324.32
15479.38 90.18 154.14 7287.58 7339.58 12536.09 S 766.40 E 5961875.69 N 372271 .23 E 1.46 11419.40
15575.09 90.18 153.68 7287.28 7339.28 12622.04 S 808.49 E 5961789.02 N 372311.84 E 0.48 11515.06
15670.86 92.34 152.45 7285.18 7337.18 12707.40 S 851.86 E 5961702.94 N 372353.75 E 2.60 1161 0.77
15764.40 93.45 152.28 7280.45 7332.45 12790.16 S 895.19 E 5961619.45 N 372395.65 E 1.20 11704.19
15860.73 90.68 150.60 7276.98 7328.98 12874.70 S 941.21 E 5961534.13 N 372440.22 E 3.36 11800.44
15955.66 89.02 147.84 7277.23 7329.23 12956.25 S 989.79 E 5961451.77 N 372487.39 E 3.39 11895.26
16049.47 89.14 147.63 7278.74 7330.74 13035.56 S 1039.86 E 5961371.61 N 372536.10 E 0.26 11988.81
16146.20 89.57 147.07 7279.82 7331.82 13117.00 S 1092.04 E 5961289.29 N 372586.88 E 0.73 12085.22
16242.04 90.12 147.67 7280.08 7332.08 13197.71 S 1143.72 E 5961207.70 N 372637.17 E 0.85 12180.76
16338.82 90.68 147.50 7279.41 7331.41 13279.41 S 1195.60 E 5961125.13 N 372687.64 E 0.61 12277.27
16434.25 91.11 147.17 7277.92 7329.92 13359.74 S 1247.09 E 5961043.93 N 372737.76 E 0.57 12372.38
16529.45 90.68 151.69 7276.43 7328.43 13441 .68 S 1295.49 E 5960961.18 N 372784.75 E 4.77 12467.46
16623.18 92.40 152.55 7273.91 7325.91 13524.49 S 1339.31 E 5960877.62 N 372827.14 E 2.05 12561.15
16720.21 92.77 152.67 7269.53 7321.53 13610.56 S 1383.90 E 5960790.81 N 372870.25 E 0.40 12658.07
16815.70 93.45 152.40 7264.35 7316.35 13695.16 S 1427.87 E 5960705.47 N 372912.77 E 0.77 12753.41
16911.29 93.76 151 .29 7258.34 7310.34 13779.27 S 1472.89 E 5960620.60 N 372956.34 E 1.20 12848.81
17003.94 94.13 151.54 7251.97 7303.97 13860.44 S 1517.11 E 5960538.69 N 372999.17 E 0.48 12941.24
17085.00 94.13 151.54 7246.13 7298.13 13931.51 S 1555.64 E 5960466.96 N 373036.48 E 0.00 13022.09
http://bizak/./drilling/data/Operations/Alpine/CD2/CD2-37/Daily Logs %26 Surveys/CD2-37 (Final Surveys).xls Page 3 of 6
')
MAR 1. .l
Casing Detail
95/8" Surface Casinq
_PHILLIPS Alaska, Inc.
. A Subsidiary of PHILLIPS PETROLEUM COMPANY
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN
Jts 3 to 72
Doyon 19 RKB to LDS
FMC Gen V Hanger
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Collar
9-5/8" 36# J-55 BTC Csg
Davis Lynch Float Shoe
70 Jts
Jts 1 to 2
2 Jts
9- 5/8" shoe @
TD 12 1/4" Surface Hole
RUN TOTAL 35 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - # 4 (On stop rings of Jt #1 & #3) # 6,8,10,12
14,16,18,20,22,24,26,28,30,32,34,36,38,
40, 42, 44, 46, 48, 50, 52, 54, 56, 58, 60,62,64,66, & 68
79 joints total in shed - 72 joints total to run
Last 7 joints stay out, # 73 thru # 79.
Use API Mod Best 0 Life Artie Grade Csg Compound.
Remarks: Up Wt - K Ibs
Dn Wt - K Ibs
Block Wt 75K Ibs
SupeNisor: Don Mickey/Don Lutrick
~CJd--d- \ \
Well: CD2-37
Date: 11/8/2002
LENGTH
36.45
2.24
2972.40
1.51
81.91
1.73
DEPTH
TOPS
36.45
38.69
3011.09
3012.60
3094.51
3096.24
3105.00
)
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Hole Size:
TM D Set:
Date Set:
Csg Type:
Csg Size:
Primary
(in)
3,096 (ft)
11/9/2002
Surface Casing
9.625 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
')
Page 1 of 3
Report #:
Start:
Spud Date: 11/3/2002
1 Report Date: 11/10/2002
11/2/2002 End:
Cement Job Type: Primary
Squeeze <Dpen...Hole
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
squåe:z:é"Casing
Hole Size:
TMD Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Hole Size:
Top Set:
BTM set:
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
Pipe Movement: Reciprocating
Cementer: Jim Thompson
(ft)
(ft)
Rot Time Start:: Time End:: RPM:
Rec Time Start:21 :00 Time End: 03:45 SPM: 1
Type: Cement Casing
Volume Excess %: 115.00
Meas. From: 0
Time Circ Prior
To Cementing: 5.50
Mud Circ Rate: 252 (gpm)
Mud Circ Press: 360 (psi)
Init Torque: (ft-Ibf)
Stroke Length: 10.0 (ft)
Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Drag Up: 175,000 (Ibs) Drag Down: 115,000 (Ibs)
Start Mix Cmt: 02:40
Start Slurry Displ: 03:46
Start Displ: 03:46
End Pumping: 04:28
End Pump Date: 11/10/2002
Top Plug: Y
Bottom Plug: Y
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
5.50 (bbllmin)
5.50 (bbl/min)
Y
300 (psi)
700 (psi)
1 (min)
Y
Returns: 100/30
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method:
Density Meas By: Densometer
Type: Spud Mud Density: 10.1 (ppg) Visc: 87 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type: Mud
PVIYP: 21 (cp)/23 (lb/100ft2) Gels 10 sec: 12 (lb/100ft2) Gels 10 min: 26 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 10.2 (ppg) Volume: 234.00 (bbl)
Slurry Data
Fluid Type: Mud Push
Slurry Interval: (ft)
Water Source: lake
Mud Ðåta
Stage No: 1 Slurry No: 1013
Description: 10.5 ppg mud push Class:
To: 3,096.00 (ft) Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
(OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 3/512003 9:44:01 AM
)
)
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 11/3/2002
1 Report Date: 11/10/2002
11/2/2002 End:
Stage No: 1 Slurry No: 2 of 3
Slurry Data
Fluid Type: LEAD Description: ASLite Class: G
Slurry Interval: 3,642.00 (ft)To: 2,543.00 (ft) Cmt Vol: 410.0 (bbl) Density: 10.70 (ppg) Yield: 4.44 (ft3/sk)
Water Source: lake Slurry Vol:520 (sk) Water Vol: 256.0 (bbl) Other Vol: 0
Test Data
Thickening Time: 6.00
Free Water: (%)
Fluid Loss: 30.0 (cc)
Fluid Loss Pressure: 65 (OF)
Temperature: 65 CF)
Temperature: 65 (OF)
Temperature: 65 (OF)
Purpose: ZONAL ISOLA
Mix Water: 20.69 (gal)
Foam Job: N
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
CF)
(OF)
Pressure
50 (psi)
250 (psi)
Concentration
Trade Name
Type
Stage No: 1 Slurry No: 2 of 3 - Additives
Units
CIG
D-124
D-53
S1
D-46
D-79
D-44
FILLlTE
GYPSUM
ACCELERATOR
DEFOAMER
EXTENDER
ACCELERATOR
50.00 %BWOC
30.00 %BWOC
1.50 %BWOC
0.60 %BWOC
1.50 %BWOC
%
9.00
StagèN(): .1SlurryNO:30f3
Slurry Data
Fluid Type: TAIL Description: CI G
Slurry Interval: 2,543.00 (ft)To: 2,172.00 (ft) Cmt Vol: 49.1 (bbl)
Water Source: lake Slurry Vol:230 (sk)
Test Data
Thickening Time: 2.50
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure:
Temperature: 65 CF)
Temperature: (OF)
Temperature: (OF)
(OF)
Stage No: 1 Slurry No: 3 of 3 - Additives
Units
Trade Name
Type
DEFOAMER
DISPERSANT
ACCELERATOR
D-46
D-65
S1
Class: G
Density: 15.80 (ppg) Yield: 1.17 (ft3/sk)
Water Vol: 30.4 (bbl) Other Vol: 0
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Concentration
Units
Liquid Cone.
0.20 %BWOC
0.3C %BWOC
2.0C %BWOC
Printed: 3/512003 9:44:01 AM
)
')
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 11/3/2002
1 Report Date: 11/10/2002
11/2/2002 End:
Shoe Test
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/Survey Evaluation
Interpretation Summary
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
PJSM - Cement 9 5/8" casing - Pumped 40 bbls biozan water w/ nut plug for marker - 5 bbls water - test lines to 2500 psi - drop bottom
plug - pump 50 bbls Mudpush XL spacer @ 10.5 ppg - mix & pump Lead slurry ASL @ 10.7 ppg mixed @ 7.7 B/M @ 1115 psi final
pressure - observed nut plug marker @ shakers w/ 390 bbls lead slurry pumped - pumped down tub - 410 bbls total slurry vol. - switch
over to tail slurry Class G w/ 0.2% 0046, 0.3% D065, 2% S001 @ 15.8 ppg - mixed @ 5.4 B/M @ 861 psi final pressure - Drop top plug
w/20 bbls water f/ Dowell- switch to rig pumps & displace w/212 bbls 10.1 ppg mud - bumped plug wI 600 psi - CIP @ 0428 hrs. - floats
held - full returns until last 42 bbls of displacement - no cement returns to surface
Printed: 3/512003 9:44:01 AM
9<>nøêoP~illips<ftÅl.¡¡~~â
Daily Drilling Report
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD2-37 ODR 3,105.0 2,386.0 7.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Don Mickey/Don Lutrick Doyon 19 Alpine 17,323.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
Prep to perform top job #2 0
DATE OF LAST SAFETY MEETING DAILY TOTAL
167,264
)
WELL NAME
)
I REPT NO. IDA TE
8 11/10/2002
I CUM. TANGO
CUM INTANG WI MUD
0
CUM COST WI MUD
1,313,164
24 HR FORECAST
Pump top job - MU 8 1/2" BHA - Drill 8 1/2" hole
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF
LAST SURVEY: DATE TMD INC AZIM I LAST CASING
11/5/2002 3,044.59 62.590 179.130 9.625 (in> ~ 3,096.0 (ft)
QEN$ITY(ppg) I 9.70 I.. ppl IECO I INlUDÐAmAIDAI~YØøS,.1
FV PVlYP GELS WLlHTHP FCmSOL OIUWA T %Sand/MBT Ph/pM
40 12/20 8/16 5.4/ 2/ / 0.2/25.0 8.0/
Ø.PEAA0FIONSSU.M.MA:R¥
PHASE
SURFAC Circulate & condition mud & clean hole for cement job
256 GPM @ 340 psi - recip. pipe
SURFAC PJSM - Cement 95/8" casing - Pumped 40 bbls biozan water w/ nut plug for
marker - 5 bbls water - test lines to 2500 psi - drop bottom plug - pump 50 bbls
Mudpush XL spacer@ 10.5 ppg - mix & pump Lead slurry ASL @ 10.7 ppg
mixed @ 7.7 B/M @ 1115 psi final pressure - observed nut plug marker @
shakers w/ 390 bbls lead slurry pumped - pumped down tub - 410 bbls total
slurry vol. - switch over to tail slurry Class G w/ 0.2% D046, 0.3% D065, 2%
S001 @ 15.8 ppg - mixed @ 5.4 B/M @ 861 psi final pressure - Drop top plug
w/20 bbls water f/ Dowell- switch to rig pumps & displace w/212 bbls 10.1
ppg mud - bumped plug w/600 psi - CIP @ 0428 hrs. - floats held - full returns
until last 42 bbls of displacement - no cement returns to surface
SURFAC RD cement head & landing jt.
SURFAC Flush riser & flow line
SURFAC ND riser & starting head - LD mouse hole
SURFAC Slip & cut drill line & service top drive
SURF AC Prep for top job - RU & run 1" Hyrdil pipe to 355' tagged up - RU cement lines -
test - attempt to pump 1" pipe plugged - pull out tubing - change mule shoes -
RIH w/1" Hydril pipe to 355' - rig up cement lines - test - pump 173 bbls water
to flush f/ 355' to surface - mud wt. f/1 0.6 ppg to 9.2 ppg - 1.5 b/m @ 700 psi
SURFAC Pump 82 bbls (500 sx) 15.8 ASI cement and 89 bbls (135 sx) 10.7 AS Lite. No
cement to surface.
SURFAC NU Unihead. Test metal to metal seal to 1000 psi.
SURFAC NU BOPE. Install bell nipple and flow line.
SURFAC Install test plug and fill stack with water.
24 HR SUMMARY: Circ and cond mud. Pump 50 bbls mud push, 410 bbls lead and 49 bbls tail. No cement to surface. ND diverter. RIH w. 1"
hydril pipe for top job. Pump 173 bbls water, 82 bbls AS1 cement and 89 bbls AS Lite. No cement to surface. NU BOPE.
FROM TO HOURS CODE TROUBLE SUB
00:00 02:00 2.00 CEMENT P CIRC
02:00 04:30 2.50 CEMENT P
PUMP
04:30 05:30 1.00 CEMENT P PULD
05:30 06:00 0.50 CEMENT P OTHR
06:00 07:30 1.50 DRILL P PULD
07:30 09:00 1.50 RIGMNT P RSRV
09:00 17:30 8.50 CEMENT P TOPJ
17:30 20:30 3.00 CEMENT P TOPJ
20:30 21 :30 1.00 CASE P NUND
21 :30 23:30 2.00 WELCTL P NUND
23:30 00:00 0.50 WELCTL P OTHR
COMPANY
Phillips
Artic catering
Doyon
Sperry Sun
MI Drilling Fluids
SERVICE
AFE
WCD.W3A.0083.01
I NEXT CASING
7.000 (in> ~ 14,096.0 (ft)
0 lçuiW.CO$TI
Pf/Mf CI Ca H2S
0.05/1 20
0
LIME ES
AUTH.
4,171,613
LAST BOP PRES TEST
PERSONNEL ÐA0FA
NO. HOURS COMPANY
2 DSR
5 Dowell
26 FMC
7 AOGCC
3
NO.
4
2
1
1
HOURS
SERVICE
Printed: 3/512003 9:50:27 AM
WELL NAME
Fuel
Water, Drilling
CD2-37
RESERVOIR NAME
CD2-34
UNITS
gals
bbls
CD2-37
)
)
USAGE
1,842
820
MATERIALS 1 CONSUMPTION
ON HAND ITEM
-14,634 Water, Potable
-4,214
ON HAND
-540
UNITS
bbls
USAGE
90
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
1503 3.5 1380
COMMENTS
Printed: 3/512003 9:50:27 AM
PRESSURE INTEGRITY TEST
PHILLIPS Alaska, Inc.
Doyon 19 I Date: 11/1102 I Volume Input Volume/Stroke
Pump used: I #1 Mud Pump r ... ~ Strokes'" 0.1010 Bbls/Strk ...
... Pumping down annulus and DP. ...
Well Name:
Drilling Supervisor:
CD2-37
I Rig:
Mickey / Lutrièk
Type of Test: Casing Shoe Test LOT/FIT
Hole Size: I USE PICK UST I... ~
RKB-CHF: 34.7 Ft
Casina Size and Description:
Casina Tes1
Mud Weight:
Mud 10 min Gel
Test Pressure
Rotating Weight
BlockslTop Drive Weight:
Estimates for Test:
Casing Shoe Depth
3,096 Ft-MD 2,382 Ft- TVD
19-5/8" 36#/Ft J-55 BTC
Hole Depth
3,125 Ft-MD 2,395 Ft-TVD
1...1
Pressure IntearitvTes1
Mud Weight: 9.7 ppg
Mud 10 min Gel: 18.0 Lb/100 Ft2
Rotating Weight: 115,000 Lbs
BlockslTop Drive Weight: 75,000 Lbs
Desired PIT EMW: 16.0 ppg
Estimates for Test: 780 psi
9.6 ppg
16.0 Lb/100 Ft2
2,500 psi
115,000 Lbs
75,000 Lbs
2.1 bbls
0.7 bbls
1.1
1.1
EMW = Leak-off Pressure + Mud Weight = 780 + 9 7
0.052 x TVD 0.052 x 2382 .
EMW at 3096 Ft-MD (2382 Ft-TVD) = 16.0 ppg
PIT 15 Second
Shut-in Pressure, psi
765
3000 .
- Lost 40 psi during test, held
= 98.4% of test pressure.
2500 -
¡",-;-~ idt.::,.
2000.
JI\
- ~
w
It:
:J
~ 1500.
W
It:
0..
/
~
1000 -
~/
0
3 0
2
5 10 15 20 25
Shut-In time, Minutes
0 PIT Point
Barrels
"'-CASING TEST
~LEAK-OFF TEST
Comments:
Casing Tes1
Pumping Shut-in
Strks psi Min psi
0 100 0 2500
2 240 1 2500
4 460 2 2500
6 720 3 2495
8 880 4 2495
10 1000 5 2495
12 1130 6 2490
14 1300 7 2485
16 1460 8 2485
18 1620 9 2480
20 1810 10 2480
22 2020 15 2470
24 2200 20 2470
26 2420 25 2465
27 2500 30 2460
30
Volume
Bled Back
2.b tsbls
Volume
Pumped
2.1 tsbls
Pump Rate:
5.0 Strkjmin
...
Pressure Integrity Tes1
Pumping Shut-in
Strks psi Min psi
0 70 0 780
1 150 0.25 765
2 240 0.5 750
3 350 1 740
4 440 1.5 7~
5 510 2 7~/
6 550 2.5 695
7 630 3 685
8 720 3.5 685
9 780 4 685
4.5 680
5 680
5.5 675
6 675
6.5 670
7 670
7.5 670
8 665
8.5 660
9 660
9.5 66O,
10 €
~
Volume
Pumped
0.9 tsbls
Volume
Bled Back
0.6 tsbls
Phillips Alaska, Inc.
)
)
Casing Detail
7" Intermediate Casinç¡
Jt Number Num of Jts
Jts 3 to 342
Jts 1 to 2
Remarks:
340 Jts
2 Jts
Up Wf =
COMPLETE DESCRIPTION OF EQUIPMENT RUN
Doyon 19 RKB to LOS
FMC 11" X 7" Hanger
7" 26# L-80 STCM Csg
7" Davis Lynch Float Collar
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Shoe
7" shoe @
8-1/2" TD
1 straight blade centralizer perjt #1.3,5,7,9,11,13,15,17,19,21,&.
then # 268,269, 270 & then every other jt. FI # 272 to # 340
Total Centralizers: 50
345 joints in pipe shed - 342 total jts. to run I last 3 joints stay out
Use Best-o-Life 2000 pipe dope
On Wf = Block Wt= 75K
Well: CD2-37
Date: 11/18/2002
LENGTH
34.40
1.62
14039.68
1.30
84.01
1.45
Supervisor: Don Mickey
DEPTH
TOPS
34.40
36.02
14075.70
14077.00
14161.01
14162.46
14173.00
)
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Hole Size:
TMD Set:
Date Set:
Csg Type:
Csg Size:
Primary
8.500 (in)
14,162 (ft)
11/21/2002
Intermediate Casing/Li
7.000 (in.)
Cmtd. Csg: Surface Casing
Cement Co: Dowell Schlumberger
Rot Time Start: :
Rec Time Start: :
Time End: :
Time End: :
Type: Cement Casing
Volume Excess %: 40.00
Meas. From:
Time Circ Prior
To Cementing: 4.50
Mud Circ Rate: 168 (gpm)
Mud Circ Press: (psi)
CónócóPhilliþS Alaskà
)
Page 1 of 2
Report #:
Start:
Cøl11enIJob..TYipe: Primary
Spud Date: 11/3/2002
2 Report Date: 11/21/2002
11/2/2002 End:
SqueezêC$$ing
Hole Size:
TM D Set:
Date Set:
Csg Type:
sa TMD:
sa Date:
Cmtd. Csg:
Cementer: Steve Daughten
SqueezeOpen...¡"¡olê
Hole Size:
sa TMD: (ft)
sa Date:
sa Type:
Cmtd. Csg:
RPM:
SPM:
Pipe Movement
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Stage No: 1 of 1
Start Mix Cmt: 10:25
Start Slurry Displ: 10:25
Start Displ: 10:40
End Pumping: 12:41
End Pump Date: 11/21/2002
Top Plug: Y
Bottom Plug: Y
Type: LSND Density: 9.8 (ppg) Visc: 38 (s/qt)
Bottom Hole Circulating Temperature: (OF)
Displacement Fluid Type: Mud
Disp Avg Rate:
Disp Max Rate:
Bump Plug:
Press Prior:
Press Bumped:
Press Held:
Float Held:
Mud Data
Hole Size:
Top Set:
BTM set:
Plug Date:
Plug Type:
Drilled Out:
Cmtd. Csg:
(ft)
(ft)
Pipe Movement: No movement
Max Torque: (ft-Ibf)
Drag Down: (Ibs)
Returns: 100
Total Mud Lost: (bbl)
Cmt Vol to Surf: (bbl)
Ann Flow After: N
Mixing Method:
Density Meas By:
PVIYP: 6 (cp)/15 (lb/100ft2) Gels 10 sec: 5 (lb/100ft2) Gels 10 min: 6 (lb/100ft2)
Bottom Hole Static Temperature: (OF)
Density: 9.8 (ppg) Volume: 516.90 (bbl)
Avg Torque: (ft-Ibf)
Drag Up: (Ibs)
4.50 (bbl/min)
4.50 (bbl/min)
Y
800 (psi)
1,800 (psi)
5 (min)
N
Printed: 31512003 9:44:42 AM
')
)
Cementing Report
Legal Well Name: CD2-37
Common Well Name: CD2-37
Event Name: ROT - DRILLING
Report #:
Start:
Spud Date: 11/3/2002
2 Report Date: 11/21/2002
11/2/2002 End:
Shoe "Fést
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/Survey Evaluation
Interpretation Summary
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Printed: 3/512003 9:44:42 AM
)
)
WELL NAME
øQI'tQ~C)Pt)illiPí~lìíf(\~
DãUYDfillingRêþõn:
I JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS
CD2-37 ODR 14,173.0 7,297.0 17.00
SUPERVISOR I RIG NAME & NO. I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
G. R. Whitlock Doyon 19 Alpine 17,323.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
Circulating before cementing 7" 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL I
Cement 7". Test BOPE. RIH w/6-1/8" drilling assembly 11/11/2002 117,854
LITHOLOGY I JAR HRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
16.00 WCD.W3A.0083.01 4,171,613
LAST SURVEY: DATE TMD INC AZlM I LAST CASING I NEXT CASING LAST BOP PRES TEST
11/18/2002 14,099.36 84.520 151.800 9.625 (in> cæ 3,096.0 (ft) 7.000 (in> cæ 14,162.0 (ft) 11/11/2002
Þ!=NSITY(ppg) I 9.80 þp IEcol l\IItJÐÐ~TAIDAI~yqC)ST.1 0 IcuNlèo~ffl 0
FV PVIYP GELS WUHTHP FCI1'.SOL OILlWAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S LIME ES
41 8/16 6/7 4.6/ 2/ /90 /18.7 8.6/ /
I REPT NO. I DATE
18 11/20/2002
¡CUM. TANGO
CUM INTANG WI MUD
0
CUM COST WI MUD
3,014,252
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 00:30 0.50 CASE P NUND INTRM1 Test 7" casing rams to 250/5000 psi. R/D test equipment
00:30 01 :00 0.50 CASE P NUND INTRM1 Pull test plug and install thin wear bushing
01 :00 02:00 1.00 CASE P RURD INTRM1 R/U 7" casing equipment
02:00 05:30 3.50 CASE P RUNC INTRM1 Hold safety meeting and RIH w/7" 26# L-80 BTCM casing to 3095'
05:30 06:00 0.50 CASE P CIRC INTRM1 Circulate casing volume @ 4 bpm 230 psi. PU=135k, SO=120k
06:00 10:00 4.00 CASE P RUNC I NTRM 1 RIH w/7" casing to 6812' w/ no problems
10:00 11:00 1.00 CASE P CIRC INTRM1 Circulate casing volume @ 4 bpm 340 psi. PU=205k, SO=130k
11 :00 13:00 2.00 CASE P RUNC INTRM1 RIH w/7" casing to 8760'-check flow
13:00 14:00 1.00 CASE P CIRC INTRM1 CBU 4 bpm, 490 psi
14:00 16:30 2.50 CASE P RUNC INTRM1 RIH w/7" casing to 11245' w/ no problems
16:30 17:30 1.00 CASE P CIRC INTRM1 CBU 4 bpm 550 psi
17:30 19:30 2.00 CASE P RUNC INTRM1 RIH w/7" casing to 13090'
19:30 20:00 0.50 CASE NP DH RUNC INTRM1 Work tight casing from 13090' to 13172'
20:00 21 :00 1.00 CASE NP DH OTHR INTRM1 UD 1 jt of casing and change out lower section of Frank's fillup tool
21 :00 22:30 1.50 CASE NP DH RUNC INTRM1 P/U 1 jt of casing and work tight pipe to 13182'. P/U 535k, S/O 75k.
22:30 23:30 1.00 CASE NP DH OTHR INTRM1 UD Frank's fillup tool and blowdown topdrive. R/U circulating swedge
23:30 00:00 0.50 CASE NP DH OTHR I NTRM 1 Work tight pipe from S/O 75k to P/U 535k (weights includ block weight)
24 HR SUMMARY: RIH w/7" 26#, L-80 BTCM casing to 13172' Work tight pipe to 13182'. Working tight pipe
SERVICE
PERSONNEL D~TA
NO. HOURS COMPANY
1 DSR
5 Dowell
31 FMC
4 ABCINC
3
NO.
4
2
1
1
COMPANY
Phillips
Artic catering
Doyon
Sperry Sun
MI Drilling Fluids
SERVICE
HOURS
ITEM
UNITS
gals
bbls
MATERIALS 1 CONSUMPTION
ON HAND ITEM
-35,908 Water, Potable
-8,454 I
RESERVOIR AND INTERVAL DATA
ZONE TOP BASE
20 2 1400
USAGE
2,575
UNITS
bbls
USAGE
ON HAND
-1 ,260
Fuel
Water, Drilling
RESERVOIR NAME
CD2-34
COMMENTS
CD2-37
Printed: 3/512003 9:46:48 AM
)
)
Page 1 of2
124 HRS PROG TMD I TVD
ODR 14,173.0 7,297.0 18.00
I FIELD NAME I OCS NO. AUTH MD I DAILY TANG
Alpine 17,323.0 0
ACCIDENTS LAST 24 HRS. ? DAILY INT W/O MUD
0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
RIH Test casing. Drill out. Do LOT. Change over to OBM. 11/21/2002 324,860
LITHOLOGY I JAR HRS OF SERVICE 1 BHA HRS SINCE INSP 1 LEAKOFF AFE AUTH.
16.00 WCD.W3A.0083.01 4,171,613
LAST SURVEY: DATE TMD INC AZIM I LAST CASING I NEXT CASING LAST BOP PRES TEST
11/18/2002 14,099.36 84.520 151.800 7.000(in)@ 14,162.4(ft) (in)@ 14,162.0(ft) 11/21/2002
[)~N.$ITY(ppg) I 9.70 I PP I I ECD I I MUD DATA I DAILY COST I 0 I CUM COST I 0
F\t PVIYP GELS WUHTHP FCIT.SOL OILlWAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S LIME ES
37 6/11 3/4 4.8/ 1/ /90 /12.5 8.1/ /
WELL NAME
CD2-37
SUPERVISOR I RIG NAME & NO.
G. R. Whitlock Doyon 19
CURRENT STATUS
RIH w/6-1/* drilling assembly
~I1iÂNo¡1 7 I
BHA WT. BELOW JARS
STRING WT. UP
ITEM DESCRIPTION
Bit
Mud Motor
Adjustable Guage Stabilizer
Sub - Float
MWD
MWD
MWD
Sub - Hang Off
Flex Joint
Flex Joint
Flex Joint
Crossover
Drill Pipe - Heavy Wgt
Jars
Drill Pipe - Heavy Wgt
BHA/H0I.;E.eøNÐITI0NS
STRING WT. DN STRING WT. ROT
NO JTS
1
1
1
1
1
1
1
1
1
1
1
1
3
1
2
LENGTH
0.75
34.35
10.74
2.47
25.58
8.55
10.84
10.93
31.15
30.78
31.15
1.13
92.14
32.12
61.33
O.D.
6.125
4.750
4.820
4.750
4.750
4.720
4.720
4.730
4.680
4.750
4.680
4.750
4.000
4.750
4.000
BIT/RUN
3/
BITS
SIZE MANUF. TYPE SERIAL NO. JETS OR TFA
6.125 HUGHES-CHR DP0796 7000659 12/12/12/12/13/13
DEPTH IN DATE IN I.O.D~L"B.G~O~R
14,173.0 11/21/2002 1-4-CT-G-D.-BT-TD
7
BIT / RUN
WOB
FROM TO
00:00 03:00
03:00 03:30
03:30 04:30
04:30 05:00
05:00 05:30
05:30 09:30
09:30 11 :00
HOURS
3.00
0.50
1.00
0.50
0.50
4.00
1.50
CODE
CASE NP
CASE NP
CASE NP
CASE P
CASE P
CEMENT P
CEMENT P
BIT OPERATIONS
I GPM I PRESS I PBIT I HRS I 24Hr DI8T I
OPERATIONS SUMMARY
PHASE
INTRM1
INTRM1
INTRM1
INTRM1
INTRM1
INTRM1
INTRM1
RPM
TROUBLE SUB
DH OTHR
DH CIRC
DH OTHR
RUNC
RURD
CIRC
PUMP
TORQUE / UNITS
I.D.
1.500
2.794
2.250
2.250
1.250
1.250
1.250
1.250
2.310
2.310
2.310
2.310
2.563
2.000
2.563
19 1/21/2002
I CUM. TANGO
CUM INTANG WI MUD
0
CUM COST WI MUD
3,339,112
I BIT NO. I 3
BHA LENGTH
384.01
CONN SIZE CONN TYPE
24Hr ROP I CUMHR8 I CUM DEPTH ¡CUM ROP
DESCRIPTION
Work stuck pipe @ 13182'
Free pipe-able to move downhole. Regain circulation @ 1.5 bpm 620 psi
Packed off. Makeup new Fillup tool. RIH to 14126'
P/U landing jt and hanger. Land 7" casing @ 14162'
RID slips and fillup tool. RlU cement head
Break circulation @ 1 bpm-700 psi. Increase rate to 4 bpm-590 psi
Safety meeting w/ crews. Mix and pump 5 bbl Arco wash, Test lines to 3500
psi-OK. 15 bbl Arco wash, 50 bb112.5 ppg Mudpush XL, dropped bottom plug,
54 bbl cement @ 15.8 ppg, Dropped top plug and pumped 20 bbl water.
Printed: 3/512003 9:48:42 AM
WELL NAME
CD2-37
)
)
OPERATIONS SUMMARY
PHASE DESCRIPTION
INTRM1 Displaced cement wI 516.9 bbl mud wI rig pump (517.7 calculated) Bumped
plug wI 1800 psi-checked floats-OK
RID cementing equipment
Pull wearring and install packoff-test to 5000 psi
Change pipe rams-Change out topdrive crossovers
R/U and test BOPE to 250/5000psi-R/D test equipment. Jeff Jones wI AOGCC
waived witnessing the test
Install wearring. P/U bails
UD 1 std 8" d.c.'s out of derrick
Change pipe handling equipment over to 4"
P/U BHA. Test AGS. Continue P/U BHA. Adjust motor, orient
FROM TO HOURS CODE TROUBLE SUB
11 :00 13:00 2.00 CEMENT P DISP
13:00 13:30 0.50 CEMENT P
13:30 14:30 1.00 WELCTL P
14:30 16:00 1.50 WELCTL P
16:00 20:00 4.00 WELCTL P
20:00 20:30 0.50 WELCTL P
20:30 21 :00 0.50 DRILL P
21 :00 21 :30 0.50 DRILL P
21 :30 00:00 2.50 DRILL P
RURD INTRM1
NUND INTRM1
EQRP INTRM1
BOPE INTRM1
NUND INTRM1
PULD INTRM1
PULD INTRM1
PULD INTRM1
24 HR SUMMARY: Finish running 7" intermediate casing and cement. Test BOPE and M/U BHA
COMPANY
Phillips
Artic catering
Doyon
Sperry Sun
MI Drilling Fluids
ITEM
UNITS
gals
bbls
Fuel
Water, Drilling
RESERVOIR NAME
CD2-34
CD2-37
SERVICE
PERSONNELÐATA
NO. HOURS COMPANY
2 DSR
5 Dowell
28 FMC
4 ABCINC
3
HOURS
SERVICE
NO.
4
2
1
1
USAGE
2,665
470
MATERIALS rCONSUMPTION
ON HAND ITEM
-38,573 Water, Potable
-8,924
USAGE
UNITS
bbls
-1,260
RESERVOIR AND INTERVAL . DATA
ZONE TOP BASE
1033 3.5 1490
COMMENTS
Printed: 3/512003 9:48:42 AM
Well Name:
Drilling Supervisor:
CD2-37
I Rig:
G.R. Whitlock
PRESSURE INTEGRITY TEST
PHILLIPS Alaska, Inc.
Doyon 19 I Date: 11/22/2002 I Volume Input
Pump used: I Cement Unit I... Barrels ...
... Pumping down annulus. ...
Hole Depth
14,173 Ft-MD 7,296 Ft-TVD
I.
Pressure InteQritvTesf
Mud Weight: 9.8 ppg
Inner casing OD 7.0 In.
Desired PIT EMW:
Estimates for Test:
15.8 ppg
743 psi
0.6 bbls
I.
Type of Test: Annulus Leak Off Test for Disposal Adequacy
Hole Size: 18-1/2" I. Casing Shoe Depth
RKB-CHF: 36.5 Ft 3,096 Ft-MD 2,382 Ft-TVD
CasinQ Size and Description: 17" 26#/Ft L-80 BYC-MOD
ChanQes for Annular Adeauacv Tes
Enter outer casing shoe test results in comments
Casing Description references outel casing string
Hole Size is that drilled below outer casing.
Use estimated TOC for Hole Depth.
Enter inner casing 00 at right.
r.
EMW = Leak-off Pressure + Mud Weight = 620 + 9 8
0.052 x TVD 0.052 x 2382 .
EMW at 3096 Ft-MD (2382 Ft-TVD) = 14.8
1000 .
PIT 15 Second
Shut-in Pressure, psi
520
.... .....
...
w
~
:J
en 500 -
en
w
~
0..
/
/
/
o~
0
2
4
6 8
Barrels
10
---CASING TEST
~LEAK-OFF TEST
Comments:
9-5/8" shoe tested to 16.0 ppg EM\/\¡
~~
12
14
16 0
5 10 15 20 25
Shut-In time, Minutes
0 PIT Point
Casing Test
Pumping Shut-in
Bbls psi Min psi
0
1
2
3
4
5
6
7
8
9
10
15
20
25
30
30
...
Pump Rate:
0.5 Bbl/min
~
Pressure Integrity Tesf
Pumping Shut-in
Bbls psi Min psi
0 0 0 565
1 71 0.25 520
2 136 0.5 510
3 207 1 495
4 278 1.5 49C
5 343 2 48~
6 414 2.5 480
7 475 3 475
8 530 3.5 475
9 580 4 470
10 620 4.5 470
10.5 620 5 464
11 620 5.5 464
11.5 620 6 464
12 620 6.5 464
12.5 600 7 459
13 586 7.5 459
13.5 576 8 459
14 570 8.5 459
14.5 565 9 454
15 565 9.5 454
10 45 ,
15 44ö-"""
20 429
25 419
30 414
Volume Volume Volume Volume
Pumped Bled Back Pumped Bled Back
0.0 ~bls _tSbls 1~.0 ~bls _~bIS
)
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-37 GYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00 I MD
0.00' MD (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
')
~~C;;}} f
02-Jan-03
RECEIVED
JAN 0 3 2003
Aiasiœ on & Gas Cons. commiIIton
Andlcnge
.-
)::
;,,""
~
r]
c
co
Sperry-Sun Drilling Services
.~,
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-37 GYRO
Job No. AKF022175, Surveyed: 25 November, 2002
Survey Report
31 December, 2002
/--...
~.
Your Ref: 501032043400
Surface Coordinates: 5974423.05 N, 371719.40 E (70020' 18.0790" N, 151002' 27.2973" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974423.05 N, 128280.60 W (Grid)
Surface Coordinates relative to Structure: 19.82 S, 2.25 E (True)
Kelly Bushing: 52.50ft above Mean Sea Level
Elevation relative to Project V Reference: 52. 50ft
Elevation relative to Structure: 52.50ft
spar'r',:/-SUI!
DFtIL..L..NG seRVices
A Halliburton Company
N-V=:'
Survey Ref: svy10012
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37 GYRO
Your Ref: 501032043400
Job No. AKF022175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -52.50 0.00 0.00 N O.OOE 5974423.05 N 371719.40 E 0.00 Tolerable Gyro
114.00 0.000 0.000 61.50 114.00 0.00 N 0.00 E 5974423.05 N 371719.40 E 0.000 0.00
164.00 0.750 240.000 111.50 164.00 0.16 S 0.28W 5974422.89 N 371719.11 E 1.500 0.01
253.00 2.000 259.000 200.4 7 252.97 0.75 S 2.31 W 5974422.34 N 371717.08 E 1.4 76 -0.43
/,"*'." 344.00 4.150 262.000 291.34 343.84 1.51 S 7.13W 5974421.66 N 371712.24 E 2.368 -2.03
432.00 6.750 252.000 378.93 431.43 3.55S 15.21 W 5974419.76 N 371704.14 E 3.135 -4.03
521.00 7.750 235.000 467.23 519.73 8.61 S 25.10 W 5974414.87 N 371694.16 E 2.647 -4.22
611.00 9.000 221.000 556.28 608.78 17.41 S 34.69 W 5974406.24 N 371684.42 E 2.647 -0.98
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' MSL. Northings and Eastings are relative to 1934' FNL, 1519' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1934' FNL, 1519' FEL and calculated along an Azimuth of 151.900° (True).
Magnetic Declination at Surface is 24.788°(02-Nov-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 611.00ft.,
The Bottom Hole Displacement is 38.81ft., in the Direction of 243.350° (True).
Survey tool program for CD2-37 GYRO
r-'"
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
0.00
611.00
608.78 Tolerable Gyro
31 December, 2002 - 11:01
Page 2 of 2
DrillQuest 3.03.02.004
')
)
dO~-d I (
31-Dec-02
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-37
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
0.00' MD (if applicable)
17,085.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment( s)
JAN 0 3 2003
Alaska on & Gas Cons. Commi88ton
Andlorlge
-
-
~~
.~
ft
Sperry-Sun Drilling Services
r-,
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-37
Job No. AKZZ22175, Surveyed: 25 November, 2002
Sur v e y
R e p 0 r t
31 December, 2002
,....-.
Your Ref: 501032043400
Surface Coordinates: 5974423.05 N, 371719.40 E (70020'18.0790" N, 151002' 27.2973" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974423.05 N, 128280.60 W (Grid)
Surface Coordinates relative to Structure: 19.82 S, 2.25 E (True)
Kelly Bushing: 52. 50ft above Mean Sea Level
Elevation relative to Project V Reference: 52.50ft
Elevation relative to Structure: 52. 50ft
5pBr'r'Y-5Ur-,
b~ILLIN~ SERvu::es
A Halliburton Company
) :::'f\ - VE
Survey Ref: 5vy10014
Sperry-Sun Drilling Services
Survey Report for Alpine CD..2 .. CD2..37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
611.00 9.000 221.000 556.28 608.78 17.41 S 34.69 W 5974406.24 N 371684.42 E -0.98 AK-6 BP _IFR-AK
737.85 9.550 209.840 681.48 733.98 34.03 S 46.43 W 5974389.82 N 371672.39 E 1.480 8.14
829.70 10.770 206.340 771.89 824.39 48.33 S 54.03 W 5974375.66 N 371664.55 E 1 .488 17.18
919.96 11.830 200.170 860.40 912.90 64.57 S 60.97 W 5974359.53 N 371657.34 E 1.780 28.24
~'. 1017.27 15.250 189.500 955.01 1007.51 86.56 S 66.52 W 5974337.64 N ~71651.41 E 4.338 45.03
1110.81 20.820 187.620 1043.92 1096.42 115.20 S 70.76 W 5974309.08 N 371646.68 E 5.986 68.29
1205.25 23.780 190.050 1131.28 1183.78 150.59 S 76.31 W 5974273.79 N 371640.53 E 3.282 96.90
1300.72 25.710 192.470 1217.99 1270.49 189.77 S 84.14 W 5974234.75 N 371632.03 E 2.283 127.77
1393.21 29.090 188.360 1300.10 1352.60 231.62 S 91.74 W 5974193.04 N 371623.71 E 4.186 161.10
1491.02 33.160 185.530 1383.81 1436.31 281.79 S 97.78 W 5974142.97 N 371616.81 E 4.421 202.52
1582.06 36.450 183.770 1458.56 1511.06 333.57 S 101.96 W 5974091.27 N 371611.75E 3.778 246.23
1679.16 39.130 182.200 1535.29 1587.79 392.98 S 105.03 W 5974031.92 N 371607.66 E 2.932 297.19
1776.25 41.870 182.800 1609.11 1661.61 455.97 S 107.79 W 5973968.99 N 371603.82 E 2.850 351.45
1869.21 44.760 184.200 1676.74 1729.24 519.61 S 111.71 W 5973905.42 N 371598.82 E 3.276 405.75
1966.95 47.700 183.330 1744.35 1796.85 590.03 S 116.33 W 5973835.09 N 371593.00 E 3.076 465.69
2062.44 50.880 182.800 1806.62 1859.12 662.30 S 120.19W 5973762.90 N 371587.90 E 3.357 527.63
2154.43 53.970 183.710 1862.71 1915.21 735.08 S 124.34 W 5973690.20 N 371582.50 E 3.449 589.87
2251.96 55.740 185.470 1918.85 1971.35 814.57 S 130.73 W 5973610.84 N 371574.75 E 2.339 656.97
2344.78 57.250 184.000 1970.09 2022.59 891.69 S 137.11 W 5973533.83 N 371567.05 E 2.095 722.01
2442.99 59.000 180.370 2021.96 2074.46 975.01 S 140.27 W 5973450.58 N 371562.47 E 3.609 794.02
2537.06 60.530 178.140 2069.33 2121.83 1056.27 S 139.20 W 5973369.32 N 371562.15 E 2.615 866.20
2632.01 61.520 178.980 2115.33 2167.83 1139.30 S 137.11 W 5973286.26 N 371562.82 E 1.298 940.43
2727.38 62.630 177.940 2159.99 2212.49 1223.54 S 134.85 W 5973202.00 N 371563.64 E 1.511 1015.80
2823.04 62.670 177.210 2203.94 2256.44 1308.42 S 131.25 W 5973117.06 N 371565.79 E 0.679 1092.38
2917.91 62.590 177.310 2247.56 2300.06 1392.58 S 127.22 W 5973032.85 N 371568.37 E 0.126 1168.51
3013.37 62.590 178.130 2291.50 2344.00 1477.25 S 123.85 W 5972948.13 N 371570.29 E 0.763 1244.79
3044.59 62.590 179.130 2305.88 2358.38 1504.96 S 123.19W 5972920.42 N 371570.48 E 2.843 1269.54
3171.19 63.120 180.640 2363.64 2416.14 1617.61 S 122.97 W 5972807.78 N 371568.78 E 1.141 1369.02
3266.89 64.290 180.440 2406.03 2458.53 1703.40 S 123.77 W 5972722.01 N 371566.50 E 1.237 1444.32
3362.62 63.180 179.410 2448.40 2500.90 1789.25 S 123.67 W 5972636.18 N 371565.14 E 1.508 1520.09
31 December, 2002 - 11:03
Page 2 of 8
DrillQLlest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD..2 .. CD2-37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3461.24 64.350 180.630 2491.99 2544.49 1877.70 S 123.70 W 5972547.74 N 371563.59 E 1.624 1598.11
3556.92 65.020 180.530 2532.90 2585.40 1964.19 S 124.58 W 5972461.28 N 371561.24 E 0.707 1673.99
3652.80 66.390 180.470 2572.35 2624.85 2051.57 S 125.34 W 5972373.92 N 371558.98 E 1.430 1750.71
3748.09 67.530 178.620 2609.65 2662.15 2139.25 S 124.64 W 5972286.24 N 371558.18 E 2.150 1828.39
~. 3844.10 65.970 177.320 2647.55 2700.05 2227.41 S 121.52 W 5972198.05 N 371559.79 E 2.046 1907.62
3942.76 65.840 177.670 2687.83 2740.33 2317.38 S 117.58 W 5972108.02 N 371562.19 E 0.350 1988.84
4038.38 66.520 176.820 2726.44 2778.94 2404.76 S 113.37 W 5972020.59 N 371564.90 E 1.080 2067.90
4133.84 65.850 175.970 2764.99 2817.49 2491.91 S 107.89 W 5971933.35 N 371568.90 E 1.075 2147.37
4229.56 63.400 172.150 2806.02 2858.52 2577.91 S 98.97 W 5971847.21 N 371576.35 E 4.421 2227.43
4323.58 63.450 170.830 2848.08 2900.58 2661.07 S 86.52 W 5971763.85 N 371587.36 E 1.257 2306.65
4422.48 60.590 171.500 2894.48 2946.98 2747.36 S 73.10 W 5971677.34 N 371599.31 E 2.953 2389.09
4518.04 62.020 170.050 2940.36 2992.86 2830.09 S 59.66 W 5971594.39 N 371611.33 E 2.003 2468.40
4613.22 60.230 174.020 2986.34 3038.84 2912.61 S 48.09 W 5971511.69 N 371621.49 E 4.108 2546.64
4708.74 59.530 178.460 3034.29 3086.79 2995.02 S 42.66 W 5971429.20 N 371625.51 E 4.087 2621.89
4804.75 59.270 182.240 3083.17 3135.67 3077.63 S 43.16 W 5971346.61 N 371623.59 E 3.399 2694.53
4902.82 60.230 181.270 3132.58 3185.08 3162.31 S 45.75 W 5971261.99 N 371619.55 E 1.299 2768.01
4998.34 61.440 181.770 3179.13 3231.63 3245.69 S 47.97 W 5971178.66 N 371615.91 E 1.347 2840.51
5090.09 60.260 182.560 3223.82 3276.32 3325.76 S 50.99 W 5971098.65 N 371611.52 E 1.490 2909.72
5184.92 58.740 185.390 3271.95 3324.45 3407.25 S 56.64 W 5971017.26 N 371604.48 E 3.030 2978.95
5284.78 59.500 184.880 3323.21 3375.71 3492.61 S 64.31 W 5970932.05 N 371595.35 E 0.878 3050.64
5383.68 60.480 185,170 3372.67 3425.17 3577.92 S 71.81 W 5970846.88 N 371586.39 E 1.023 3122.36
5479.36 61.730 184.520 3418.90 3471.40 3661.39 S 78.88 W 5970763.54 N 371577.89 E 1 .435 3192.66
5574,89 62.380 184.680 3463.67 3516.17 3745.51 S 85.65 W 5970679.55 N 371569.68 E 0.696 3263.67
5670.41 58.810 183,040 3510.56 3563.06 3828.52 S 91.27 W 5970596.66 N 371562.64 E 4.025 3334.25
5765,79 59.830 182.840 3559.23 3611.73 3910.44 S 95.48 W 5970514.82 N 371557.04 E 1.085 3404.53
5864,69 60.950 182.430 3608.09 3660.59 3996.33 S 99.43 W 5970429.01 N 371551.62 E 1.188 3478.44
5960.38 62,000 182.280 3653.79 3706.29 4080.33 S 102.89 W 5970345.08 N 371546.72 E 1.106 3550.91
6053.94 59,890 181.520 3699.23 3751.73 4162.07 S 105.60 W 5970263.40 N 371542.61 E 2.364 3621.73
6151.14 60,390 181.680 3747.62 3800.12 4246.33 S 107.96 W 5970179.19 N 371538.81 E 0.534 3694.95
6246.58 61.230 181.090 3794.17 3846.67 4329.62 S 109.97 W 5970095.94 N 371535.38 E 1.032 3767.48
31 December, 2002 - 11:03
Page 3 0'8
DrillQlIest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
6339.18 61.310 180.620 3838.68 3891.18 4410.81 S 111.18W 5970014.78 N 371532.78 E 0.453 3838.53
6440.30 61.820 179.310 3886.83 3939.33 4499.73 S 111.12W 5969925.88 N 371531.31 E 1.246 3916.99
6536.07 62.770 178.840 3931.35 3983.85 4584.51 S 109.75 W 5969841.09 N 371531.23 E 1.083 3992.42
6631.49 63.050 178.990 3974.81 4027.31 4669.45 S 108.14 W 5969756.14 N 371531.39 E 0.325 4068.11
/~ 6725.37 63.440 178.470 4017.07 4069.57 4753.25 S 106.29 W 5969672.31 N 371531.81 E 0.646 4142.91
6825.38 62.570 178.470 4062.46 4114.96 4842.34 S 103.91 W 5969583.20 N 371532.67 E 0.870 4222.61
6920.42 62.100 178.270 4106.59 4159.09 4926.48 S 101.51 W 5969499.03 N 371533.62 E 0.528 4297.96
7016.23 62.700 177.640 4150.98 4203.48 5011.33 S 98.48 W 5969414.14 N 371535.20 E 0.855 4374.24
7111.55 62.430 177.200 4194.90 4247.40 5095.84 S 94.67 W 5969329.57 N 371537.56 E 0.498 4450.59
7206.78 62.850 178.440 4238.67 4291.17 5180.35 S 91.46 W 5969245.02 N 371539.33 E 1.238 4526.65
7305.50 62.750 178.300 4283.79 4336.29 5268.12 S 88.96 W 5969157.22 N 371540.33 E 0.162 4605.25
7401.04 61.460 179.320 4328.49 4380.99 5352.54 S 87.20 W 5969072.79 N 371540.64 E 1.647 4680.55
7496.60 61.580 180.130 4374.06 4426.56 5436.53 S 86.80 W 5968988.80 N 371539.61 E 0.756 4754.83
7591.98 61.040 181.330 4419.85 4472.35 5520.19 S 87.86 W 5968905.17 N 371537.11 E 1.240 4828.13
7687.47 61.640 180.370 4465.65 4518.15 5603.97 S 89.11 W 5968821.42 N 371534.44 E 1.083 4901.45
7785.67 62.290 180.590 4511.80 4564.30 5690.65 S 89.83 W 5968734.77 N 371532.23 E 0.691 4977.56
7881.35 62.770 180.470 4555.94 4608.44 5775.54 S 90.62 W 5968649.91 N 371529.99 E 0.514 5052.07
7977.02 62.700 180.810 4599.76 4652.26 5860.57 S 91.57 W 5968564.90 N 371527.59 E 0.324 5126.64
8072.21 61.000 180.220 4644.67 4697.17 5944.49 S 92.32 W 5968481.00 N 371525.39 E 1.868 5200.31
8167.65 61.650 179.820 4690.47 4742.97 6028.23 S 92.35 W 5968397.28 N 371523.93 E 0.774 5274.16
8265.80 62.360 179.120 4736.54 4789.04 6114.89 S 91.55 W 5968310.62 N 371523.25 E 0.959 5350.99
8361.77 62.720 181.080 4780.80 4833.30 6200.04 S 91.70 W 5968225.49 N 371521.65 E 1.851 5426.03
8456.79 63.550 181.750 4823.74 4876.24 6284.78 S 93.80 W 5968140.80 N 371518.10 E 1.076 5499.79
8552.17 64.200 181.730 4865.73 4918.23 6370.37 S 96.40 W 5968055.26 N 371514.04 E 0.682 5574.07
8647.42 64.500 180.920 4906.97 4959.47 6456.21 S 98.38 W 5967969.47 N 371510.58 E 0.829 5648.86
8744.21 63.050 179.640 4949.74 5002.24 6543.03 S 98.81 W 5967882.66 N 371508.67 E 1.911 5725.25
8840.65 62.030 178.870 4994.21 5046.71 6628.60 S 97.70 W 5967797.09 N 371508.31 E 1.273 5801.25
8936.15 61.880 178.300 5039.11 5091.61 6712.86 S 95.62 W 5967712.81 N 371508.95 E 0.550 5876.56
9031.08 62.660 177.920 5083.28 5135.78 6796.84 S 92.85 W 5967628.79 N 371510.29 E 0.895 5951.94
9125.65 63.340 177.880 5126.21 5178.71 6881.05 S 89.76 W 5967544.55 N 371511.94E 0.720 6027.68
31 December, 2002 - 11:03
Page 4 of 8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9225.19 62.790 179.260 5171.30 5223.80 6969.76 8 87.54 W 5967455.81 N 371512.64 E 1.354 6106.98
9320.37 61.580 182.090 5215.72 5268.22 7053.92 8 88.52 W 5967371.68 N 371510.22 E 2.921 6180.76
9416.08 62.070 181.350 5260.92 5313.42 7138.258 91.05 W 5967287.40 N 371506.24 E 0.852 6253.95
9511.33 62.640 181.930 5305.11 5357.61 7222.59 8 93.4 7 W 5967203.12 N 371502.38 E 0.806 6327.22
9606.36 63.240 181.570 5348.34 5400.84 7307.188 96.05 W 5967118.59 N 371498.35 E 0.716 6400.62
..--.
/'
9704.68 63.600 181.570 5392.33 5444.83 7395.07 8 98.46 W 5967030.74 N 371494.44 E 0.366 6477.02
9800.44 62.960 181.240 5435.39 5487.89 7480.58 8 100.56 W 5966945.28 N 371490.88 E 0.736 6551.46
9895.61 61.570 180.190 5479.68 5532.18 7564.81 8 101.62 W 5966861.09 N 371488.38 E 1.757 6625.26
9991.41 62.090 180.630 5524.91 5577.41 7649.26 8 102.22 W 5966776.66 N 371486.33 E 0.677 6699.4 7
10086.70 62.640 180.720 5569.11 5621.61 7733.67 8 103.22 W 5966692.28 N 371483.90 E 0.583 6773.46
10184.83 63.940 178.840 5613.22 5665.72 7821.328 102.87 W 5966604.63 N 371482.74 E 2.164 6850.94
10279.99 64.490 178.760 5654.61 5707.11 7906.99 8 101.08 W 5966518.95 N 371483.07 E 0.583 6927.36
10375.68 63.330 178.040 5696.69 5749.19 7992.89 8 98.68 W 5966433.02 N 371484.00 E 1.388 7004.26
10471.45 61.950 177.780 5740.71 5793.21 8077.89 8 95.58 W 5966347.98 N 371485.64 E 1.461 7080.70
10566.73 61.110 177.330 5786.13 5838.63 8161.578 92.01 W 5966264.25 N 371487.78 E 0.974 7156.20
10661.42 61.380 176.980 5831.68 5884.18 8244.48 8 87.89 W 5966181.28 N 371490.48 E 0.432 7231.28
10758.06 61.750 176.810 5877.69 5930.19 8329.34 S 83.28 W 5966096.36 N 371493.63 E 0.413 7308.30
10850.61 62.260 177.160 5921.14 5973.64 8410.94 S 78.99 W 5966014.69 N 371496.54 E 0.644 7382.32
10949.02 62.700 178.730 5966.61 6019.11 8498.168 75.86 W 5965927.43 N 371498.17E 1.484 7460.72
11042.97 63.040 179.730 6009.45 6061.95 8581.768 74.74 W 5965843.82 N 371497.86 E 1.014 7535.00
11139.56 62.980 182.310 6053.29 6105.79 8667.81 8 76.27 W 5965757.82 N 371494.86 E 2.381 7610.18
';';;;;;'i" 11232.41 63.450 186.760 6095.15 6147.65 8750.41 8 82.83 W 5965675.34 N 371486.89 E 4.308 7679.96
( 11330.54 64.020 186.950 6138.58 6191.08 8837.778 93.33 W 5965588.17 N 371474.89 E 0.606 7752.08
11425.30 64.560 186.310 6179.69 6232.19 8922.588 103.19 W 5965503.54 N 371463.59 E 0.834 7822.25
11524.62 64.570 186.560 6222.34 6274.84 9011.718 113.24 W 5965414.60 N 371452.01 E 0.228 7896.13
11617.09 61.790 184.340 6264.06 6316.56 9093.84 8 121.09 W 5965332.61 N 371442.75 E 3.691 7964.89
11 711.58 60.260 183.770 6309.84 6362.34 9176.29 8 126.94 W 5965250.27 N 371435.49 E 1.703 8034.86
11808.15 60.400 180.330 6357.65 6410.15 9260.138 129.94 W 5965166.50 N 371431.06 E 3.098 8107.41
11903.88 60.830 180.960 6404.62 6457.12 9343.54 8 130.88 W 5965083.12 N 371428.69 E 0.728 8180.54
11997.49 61.250 180.130 6449.95 6502.45 9425.44 S 131.66 W 5965001.24 N 371426.51 E 0.896 8252.42
31 December, 2002 - 11:03
Page 50f8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1 OOft)
12094.54 61.370 178.580 6496.54 6549.04 9510.568 130.70 W 5964916.11 N 371426.02 E 1 .406 8327.96
12189.97 60.910 180.540 6542.61 6595.11 9594.138 130.05 W 5964832.55 N 371425.23 E 1.862 8401.99
12285.59 60.950 180.430 6589.07 6641.57 9677.708 130.76 W 5964749.00 N 371423.09 E 0.109 8475.37
12380.87 60.800 178.690 6635.44 6687.94 9760.93 8 130.12 W 5964665.77 N 371422.31 E 1.603 8549.09
12476.39 60.320 178.990 6682.39 6734.89 9844.108 128.44 W 5964582.59 N 371422.57 E 0.572 8623.25
~.
12571.80 60.200 178.990 6729.72 6782.22 9926.938 126.98 W 5964499.75 N 371422.61 E 0.126 8697.00
12667.51 60.130 179.370 6777.34 6829.84 10009.948 125.79 W 5964416.72 N 371422.38 E 0.352 8770.79
12762.55 60.590 179.130 6824.34 6876.84 10092.54 8 124.71 W 5964334.12 N 371422.05 E 0.531 8844.16
12858.10 60.950 178.210 6871.00 6923.50 10175.90 S 122.77 W 5964250.74 N 371422.56 E 0.921 8918.61
12951.75 61.240 177.800 6916.27 6968.77 10257.838 119.92 W 5964168.77 N 371424.01 E 0.493 8992.23
13048.85 61.820 177.850 6962.55 7015.05 10343.13 S 116.68 W 5964083.43 N 371425.79 E 0.599 9069.00
13143.77 63.750 175.600 7005.97 7058.47 10427.398 111.84 W 5963999.10 N 371429.19 E 2.929 9145.60
13239.50 66.450 173.060 7046.27 7098.77 10513.788 103.25 W 5963912.58 N 371436.30 E 3.707 9225.86
13334.85 68.990 170.610 7082.43 7134.93 10601.108 90.70 W 5963825.06 N 371447.35 E 3.570 9308.79
13429.25 71.010 167.910 7114.72 7167.22 10688.23 8 74.16 W 5963737.65 N 371462.40 E 3.435 9393.45
13525.78 73.850 165.480 7143.86 7196.36 10777.778 52.97 W 5963647.76 N 371482.06 E 3.797 9482.41
13621.20 77.030 162.310 7167.85 7220.35 10866.478 27.34 W 5963558.64 N 371506.17 E 4.631 9572.73
13717.29 79.420 158.910 7187.46 7239.96 10955.188 3.90E 5963469.41 N 371535.88 E 4.264 9665.69
13812.49 81.790 156.180 7203.00 7255.50 11041.968 39.77 E 5963382.02 N 371570.26 E 3.768 9759.14
13907.97 82.340 153.320 7216.19 7268.69 11127.48 S 80.11 E 5963295.82 N 371609.13 E 3.022 9853.58
14003.79 83.590 152.030 7227.92 7280.42 11211.978 123.76 E 5963210.61 N 371651.33 E 1.867 9948.67
14099.36 84.520 151.800 7237.82 7290.32 11295.83 8 168.51 E 5963125.99 N 371694.64 E 1.002 10043.72
14234.76 87.600 150.980 7247.12 7299.62 11414.408 233.19 E 5963006.33 N 371757.28 E 2.354 10178.78
14334.21 88.150 150.460 7250.81 7303.31 11501.088 281.79 E 5962918.83 N 371804.39 E 0.761 10278.14
14429.65 86.370 151.890 7255.37 7307.87 11584.608 327.75 E 5962834.54 N 371848.92 E 2.391 10373.46
14525.14 87.230 150.800 7260.70 7313.20 11668.26 S 373.47 E 5962750.11 N 371893.20 E 1.453 10468.79
14620.80 86.550 152.420 7265.89 7318.39 11752.298 418.88 E 5962665.32 N 371937.17 E 1.834 10564.31
14716.33 87.540 152.000 7270.82 7323.32 11836.68 8 463.36 E 5962580.17 N 371980.20 E 1.125 10659.71
14810.62 86.800 156.170 7275.48 7327.98 11921.378 504.51 E 5962494.79 N 372019.89 E 4.486 10753.79
14902.30 87.230 155.840 7280.25 7332.75 12005.01 S 541.75 E 5962410.53 N 372055.69 E 0.591 10845.11
31 December, 2002 - 11:03
Page 60f8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2. CD2.37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
15001.84 88.580 155.120 7283.89 7336.39 12095.51 S 583.03 E 5962319.33 N 372095.42 E 1.537 10944.39
15095.62 90.680 159.380 7284.49 7336.99 12181.97 S 619.28 E 5962232.27 N 372130.19 E 5.064 11037.73
15192.07 89.260 158.510 7284.54 7337.04 12271.98 S 653.93 E 5962141.68 N 372163.29 E 1.727 11133.45
15286.84 89.690 158.510 7285.41 7337.91 12360.15S 688.65 E 5962052.92 N 372196.49 E 0.454 11227.59
.~, 15384.17 90.250 155.530 7285.46 7337.96 12449.75 S 726.64 E 5961962.69 N 372232.95 E 3.115 11324.52
15479.38 90.180 154.140 7285.11 7337.61 12535.92 S 767.13 E 5961875.84 N 372271.96 E 1 .462 11419.60
15575.09 90.180 153.680 7284.81 7337.31 12621.88 S 809.22 E 5961789.18 N 372312.57 E 0.481 11515.25
15670.86 92.340 152.450 7282.70 7335.20 12707.23 S 852.59 E 5961703.09 N 372354.47 E 2.595 11610.97
15764.40 93.450 152.280 7277.98 7330.48 12789.99 S 895.92 E 5961619.60 N 372396.38 E 1.200 11704.38
15860.73 90.680 150.600 7274.51 7327.01 12874.53 S 941.93 E 5961534.29 N 372440.95 E 3.362 11800.64
15955.66 89.020 147.840 7274.75 7327.25 12956.08 S 990.51 E 5961451.92 N 372488.12 E 3.393 11895.45
16049.47 89.140 147.620 7276.26 7328.76 13035.39 S 1040.59 E 5961371.76 N 372536.83 E 0.267 11989.00
16146.20 89.570 147.070 7277.35 7329.85 13116.83 S 1092.78 E 5961289.45 N 372587.62 E 0.722 12085.42
16242.04 90.120 147.670 7277.61 7330.11 13197.54 S 1144.45 E 5961207.86 N 372637.91 E 0.849 12180.96
16338.82 90.680 147.500 7276.93 7329.43 13279.24 S 1196.33 E 5961125.29 N 372688.38 E 0.605 12277.46
16434.25 91.110 147.170 7275.44 7327.94 13359.56 S 1247.83 E 5961044.09 N 372738.50 E 0.568 12372.57
16529.45 90.680 151.690 7273.95 7326.45 13441.50 S 1296.23 E 5960961.34 N 372785.49 E 4.769 12467.65
16623.18 92.400 152.550 7271.44 7323.94 13524.32 S 1340.04 E 5960877.79 N 372827.88 E 2.051 12561.34
16720.21 92.770 152.670 7267.06 7319.56 13610.38 S 1384.64 E 5960790.97 N 372870.99 E 0.401 12658.26
16815.70 93.450 152.400 7261.88 7314.38 13694.98 S 1428.61 E 5960705.63 N 372913.51 E 0.766 12753.61
16911.29 93.760 151.290 7255.87 7308.37 13779.10S 1473.63 E 5960620.76 N 372957.08 E 1.203 12849.01
~, 17003.94 94.130 151.540 7249.49 7301.99 13860.26 S 1517.85 E 5960538.85 N 372999.91 E 0.482 12941.43
17085.00 94.130 151.540 7243.66 7296.16 13931.34 S 1556.38 E 5960467.12 N 373037.22 E 0.000 13022.28 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' MSL. Northings and Eastings are relative to 1934' FNl, 1519' FEl.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1934' FNl, 1519' FEl and calculated along an Azimuth of 151.900° (True).
Magnetic Declination at Surface is 24. 788°(02-Nov-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 17085.00ft.,
The Bottom Hole Displacement is 14018.01ft., in the Direction of 173.625° (True).
31 December, 2002 - 11:03
Page 70f8
DrillQuest 3.03.02.004
> .
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2 . CD2.37
Your Ref: 501032043400
Job No. AKZZ22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
17085.00
7296.16
13931.34 S
1556.38 E
Projected Survey
Survey tool proøram for CD2-37
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
611.00
0.00 611.00
608.78 17085.00
608.78 Tolerable Gyro(CD2-37 GYRO)
7296.16 AK-6 BP _IFR-AK(CD2-37)
31 December, 2002 - 11:03
Page 8 of 8
DríllQlJest 3.03.02.004
)
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-37 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
0.00' MD (if applicable)
17,085.00' MD
)
31-Dec-02
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
aOd.-d} /
RECEIVED
JAN 03 2003
Alaska on & Gas Cons. Commisaion
AndIcnge
-.
-
~
~
'Õ
Sperry-Sun Drilling Services
,~,
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-37 MWD
Job No. AKMW22175, Surveyed: 25 November, 2002
Survey Report
31 December, 2002
"'-""
Your Ref: 501032043400
Surface Coordinates: 5974423.05 N, 371719.40 E (70020' 18.0790" N, 151002' 27.2973" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 974423.05 N, 128280.60 W (Grid)
Surface Coordinates relative to Structure: 19.82 S, 2.25 E (True)
Kelly Bushing: 52.50ft above Mean Sea Level
Elevation relative to Project V Reference: 52. 50ft
Elevation relative to Structure: 52.50ft
spe""r'Y-5UI'"l
DRILLINJ3 seÀvlces
A Halliburton Company
Survey Ref: svy10015
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2 . CD2.37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft)
611.00 9.000 221.000 556.28 608.78 17.418 34.69 W 5974406.24 N 371684.42 E -16.81 MWD Magnetic
737.85 9.550 210.650 681 .48 733.98 33.958 46.56 W 5974389.90 N 371672.26 E 1.382 -33.15
829.70 10.770 206.830 771.89 824.39 48.168 54.32 W 5974375.82 N 371664.26 E 1.517 -47.23
919.96 11.830 200.310 860.40 912.90 64.37 8 61.34 W 5974359.74 N 371656.97 E 1.837 -63.31
.~ 1017.27 15.250 190.280 955.00 1007.50 86.32 8 67.09 W 5974337.89 N 371650.85 E 4.251 -85.16
1110.81 20.820 188.160 1043.91 1096.41 114.91 8 71.65 W 5974309.39 N 371645.80 E 5.995 -113.66
1205.25 23.780 189.770 1131.28 1183.78 150.29 8 77.26 W 5974274.10 N 371639.58 E 3.200 -148.95
1300.72 25.710 192.110 1217.98 1270.48 189.51 8 84.87 W 5974235.02 N 371631.30 E 2.267 -188.03
1393.21 29.090 188.990 1300.09 1352.59 231.358 92.60 W 5974193.32 N 371622.86 E 3.969 -229.73
1491.02 33.160 186.000 1383.81 1436.31 281.468 99.11 W 5974143.32 N 371615.49 E 4.450 -279.73
1582.06 36.450 183.920 1458.55 1511.05 333.22 8 103.56 W 5974091.65 N 371610.15 E 3.841 -331.40
1679.16 39.130 182.570 1535.28 1587.78 392.62 8 106.91 W 5974032.32 N 371605.79 E 2.888 -390.73
1776.25 41.870 183.000 1609.10 1661.60 455.59 8 109.98 W 5973969.41 N 371601.64 E 2.837 -453.64
1869.21 44.760 184.470 1676.73 1729.23 519.228 114.16 W 5973905.86 N 371596.38 E 3.293 -517.19
1966.95 47.700 183.130 1744.34 1796.84 589.63 8 118.81 W 5973835.54 N 371590.52 E 3.167 -587.51
2062.44 50.880 182.650 1806.61 1859.11 661.91 8 122.45 W 5973763.33 N 371585.64 E 3.352 -659.72
2154.43 53.970 183.200 1862.70 1915.20 734.728 126.18 W 5973690.60 N 371580.67 E 3.392 -732.45
2251.96 55.740 185.350 1918.85 1971.35 814.238 132.14 W 5973611.20 N 371573.35 E 2.558 -811.85
2344.78 57.250 183.860 1970.09 2022.59 891.37 8 138.35 W 5973534.17 N 371565.82 E 2.107 -888.88
2442.99 59.000 180.230 2021.96 2074.46 974.708 141.30 W 5973450.91 N 371561.45 E 3.609 -972.14
2537.06 60.530 177.810 2069.33 2121.83 1055.958 139.89 W 5973369.65 N 371561.46 E 2.754 -1053.40
~.. 2632.01 61.520 178.570 2115.33 2167.83 1138.978 137.27 W 5973286.60 N 371562.66 E 1.256 -1136.46
2727.38 62.630 177.610 2159.99 2212.49 1223.198 134.46 W 5973202.34 N 371564.03 E 1 .465 -1220.71
2823.04 62.670 176.820 2203.94 2256.44 1308.058 130.33 W 5973117.42 N 371566.71 E 0.735 -1305.63
2917.91 62.590 177.170 2247.55 2300.05 1392.188 125.92 W 5973033.22 N 371569.69 E 0.338 -1389.83
3013.37 62.590 177.720 2291.50 2344.00 1476.848 122.14 W 5972948.51 N 371572.02 E 0.511 -1474.54
3044.59 62.590 178.940 2305.87 2358.37 1504.55 8 121.33 W 5972920.80 N 371572.35 E 3.469 -1502.25
3171.19 63.120 180.970 2363.64 2416.14 1617.19 S 121.25 W 5972808.17 N 371570.51 E 1.487 -1614.88
3266.89 64.290 180.640 2406.03 2458.53 1702.988 122.45 W 5972722.41 N 371567.83 E 1.261 -1700.64
3362.62 63.180 179.730 2448.39 2500.89 1788.82 S 122.73 W 5972636.59 N 371566.08 E 1.439 -1786.46
31 December, 2002 - 11:04
Page 2 of 8
DrillQlIest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2 . CD2.37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub.Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
3461.24 64.350 180.900 2491.99 2544.49 1877.28 S 123.22 W 5972548.15 N 371564.08 E 1.594 -1874.90
3556.92 65.020 180.880 2532.90 2585.40 1963.76 S 124.56 W 5972461.71 N 371561.26 E 0.701 -1961.34
3652.80 66.390 180.680 2572.35 2624.85 2051.14 S 125.75 W 5972374.36 N 371558.57 E 1 .441 -2048.69
3748.09 67.530 178.800 2609.65 2662.15 2138.82 S 125.35 W 5972286.69 N 371557.48 E 2.174 -2136.36
~, 3844.10 65.970 177.550 2647.55 2700.05 2226.98 S 122.55 W 5972198.49 N 371558.77 E 2.018 -2224.56
3942.76 65.840 178.040 2687.82 2740.32 2316.98 S 119.08 W 5972108.45 N 371560.70 E 0.472 -2314.60
4038.38 66.520 177.310 2726.44 2778.94 2404.38 S 115.53 W 5972021.00 N 371562.75 E 0.997 -2402.05
4133.84 65.850 176.480 2764.99 2817.49 2491.58 S 110.80 W 5971933.73 N 371565.99 E 1.061 -2489.32
4229.56 63.400 172.480 2806.02 2858.52 2577.64 S 102.52 W 5971847.54 N 371572.80 E 4.561 -2575.51
4323.58 63.450 171.070 2848.08 2900.58 2660.86 S 90.49 W 5971764.13 N 371583.41 E 1.342 -2658.92
4422.48 60.590 171.550 2894.48 2946.98 2747.19 S 77.29 W 5971677.59 N 371595.13 E 2.923 -2745.46
4518.04 62.020 170.360 2940.36 2992.86 2829.96 S 64.10 W 5971594.60 N 371606.89 E 1.853 -2828.45
4613.22 60.230 173.880 2986.33 3038.83 2912.50 S 52.66 W 5971511.88 N 371616.92 E 3.745 -2911.17
4708.74 59.530 178.570 3034.28 3086.78 2994.90 S 47.21 W 5971429.39 N 371620.96 E 4.309 -2993.66
4804.75 59.270 182.430 3083.17 3135.67 3077.52 S 47.93 W 5971346.80 N 371618.83 E 3.471 -3076.25
4902.82 60.230 181.660 3132.58 3185.08 3162.18 S 50.95 W 5971262.21 N 371614.36 E 1.191 -3160.84
4998.34 61.440 182.490 3179.13 3231.63 3245.53 S 53.97 W 5971178.92 N 371609.91 E 1.4 77 -3244.13
5090.09 60.260 183.480 3223.82 3276.32 3325.55 S 58.14 W 5971098.98 N 371604.38 E 1.594 -3324.07
5184.92 58.740 185.830 3271.95 3324.45 3406.98 S 64.76 W 5971017.68 N 371596.37 E 2.670 -3405.37
5284.78 59.500 185.380 3323.20 3375.70 3492.27 S 73.13 W 5970932.54 N 371586.54 E 0.854 -3490.51
5383.68 60.480 185.620 3372.67 3425.17 3577.52 S 81.33 W 5970847.45 N 371576.87 E 1.013 -3575.60
c- 5479.36 61.730 185.290 3418.90 3471.40 3660.90 S 89.30 W 5970764.21 N 371567.49 E 1.341 -3658.84
5574.89 62.380 185.180 3463.67 3516.17 3744.94 S 97.00 W 5970680.31 N 371558.35 E 0.688 -3742.74
5670.41 58.810 183.320 3510.56 3563.06 3827.91 S 103.19 W 5970597.4 7 N 371550.74 E 4.104 -3825.58
5765.79 59.830 183.220 3559.23 3611.73 3909.80 S 107.86 W 5970515.66 N 371544.66 E 1.073 -3907.39
5864.69 60.950 182.700 3608.09 3660.59 3995.67 S 112.30 W 5970429.88 N 371538.76 E 1.221 -3993.17
5960.38 62.000 182.550 3653.79 3706.29 4079.66 S 116.15 W 5970345.98 N 371533.47 E 1.106 -4077.07
6053.94 59.890 181.880 3699.22 3751.72 4161.38 S 119.32 W 5970264.33 N 371528.91 E 2.340 -4158.73
6151.14 60.390 182.020 3747.62 3800.12 4245.62 S 122.19 W 5970180.14 N 371524.60 E 0.529 -4242.91
6246.58 61.230 181.400 3794.16 3846.66 4328.90 S 124.67 W 5970096.91 N 371520.69 E 1.047 -4326.14
31 December, 2002 - 11:04
Page 3 of 8
Dri/lQlIest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
6339.18 61.310 181.120 3838.67 3891.17 4410.08 S 126.46 W 5970015.77 N 371517.52 E 0.279 -4407.28
6440.30 61.820 179.650 3886.83 3939.33 4499.00 S 127.05 W 5969926.88 N 371515.40 E 1.374 -4496.17
6536.07 62.770 179.250 3931.35 3983.85 4583.78 S 126.24 W 5969842.10 N 371514.77 E 1.059 -4580.95
6631.49 63.050 179.430 3974.80 4027.30 4668.73 S 125.26 W 5969757.15 N 371514.29 E 0.338 -4665.90
~, 6725.37 63.440 178.660 4017.07 4069.57 4752.55 S 123.86 W 5969673.32 N 371514.26 E 0.842 -4749.73
6825.38 62.570 179.230 4062.46 4114.96 4841.64 S 122.22 W 5969584.21 N 371514.37 E 1.007 -4838.85
6920.42 62.100 178.750 4106.59 4159.09 4925.80 S 120.73 W 5969500.03 N 371514.42 E 0.667 -4923.02
7016.23 62.700 177.830 4150.98 4203.48 5010.67 S 118.20 W 5969415.13 N 371515.50 E 1.057 -5007.92
7111.55 62.430 177.480 4194.90 4247.40 5095.20 S 114.74 W 5969330.56 N 371517.51 E 0.432 -5092.49
7206.78 62.850 178.950 4238.66 4291.16 5179.73 S 112.10 W 5969245.99 N 371518.70 E 1.440 -5177.06
7305.50 62.750 178.750 4283.79 4336.29 5267.52 S 110.34 W 5969158.19 N 371518.96 E 0.207 -5264.86
7401.04 61.460 179.650 4328.49 4380.99 5351.95 S 109.16W 5969073.75 N 371518.70 E 1.586 -5349.30
7496.60 61.580 180.330 4374.06 4426.56 5435.94 S 109.14 W 5968989.77 N 371517.28 E 0.638 -5433.28
7591.98 61.040 181.620 4419.85 4472.35 5519.60 S 110.57 W 5968906.15 N 371514.42 E 1.315 -5516.90
7687.47 61.640 180.680 4465.64 4518.14 5603.37 S 112.25 W 5968822.42 N 371511.31 E 1.068 -5600.63
7785.67 62.290 180.890 4511.80 4564.30 5690.04 S 113.43 W 5968735.79 N 371508.64 E 0.688 -5687.27
7881.35 62.770 180.830 4555.94 4608.44 5774.92 S 114.71 W 5968650.94 N 371505.91 E 0.505 -5772.11
7977.02 62.700 181.140 4599.76 4652.26 5859.95 S 116.17 W 5968565.95 N 371503.00 E 0.297 -5857.10
8072.21 61.000 180.620 4644.67 4697.17 5943.87 S 117.46 W 5968482.06 N 371500.27 E 1.850 -5940.99
8167.65 61.650 180.260 4690.47 4742.97 6027.60 S 118.10 W 5968398.36 N 371498.20 E 0.757 -6024.70
8265.80 62.360 179.520 4736.54 4789.04 6114.26 S 117.94 W 5968311.70 N 371496.88 E 0.983 -6111 .35
'~.. 8361.77 62.720 181.290 4780.79 4833.29 6199.41 S 118.54 W 5968226.57 N 371494.82 E 1.679 -6196.48
8456.79 63.550 181.930 4823.73 4876.23 6284.14 S 120.92 W 5968141.90 N 371490.99 E 1.060 -6281.15
8552.17 64.200 181.990 4865.73 4918.23 6369.73 S 123.85 W 5968056.38 N 371486.60 E 0.684 -6366.68
8647.42 64.500 181.240 4906.96 4959.46 6455.55 S 126.27 W 5967970.60 N 371482.71 E 0.777 -6452.45
8744.21 63.050 179.880 4949.73 5002.23 6542.37 S 127.13 W 5967883.81 N 371480.37 E 1.958 -6539.24
8840.65 62.030 179.330 4994.21 5046.71 6627.94 S 126.54 W 5967798.24 N 371479.49 E 1.172 -6624.81
8936.15 61.880 178.700 5039.11 5091.61 6712.22 S 125.09 W 5967713.96 N 371479.50 E 0.603 -6709.09
9031.08 62.660 178.500 5083.28 5135.78 6796.22 S 123.04 W 5967629.93 N 371480.12 E 0.843 -6793.12
9125.65 63.340 178.560 5126.21 5178.71 6880.45 S 120.87 W 5967545.67 N 371480.84 E 0.721 -6877.38
31 December, 2002 - 11:04
Page 4 of8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2. CD2.37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
9225.19 62.790 179.230 5171.30 5223.80 6969.18 S 119.16 W 5967456.93 N 371481.03 E 0.816 -6966.12
9320.37 61.580 182.320 5215.72 5268.22 7053.34 S 120.29 W 5967372.80 N 371478.46 E 3.140 -7050.25
9416.08 62.070 181.590 5260.91 5313.41 7137.65 S 123.16W 5967288.55 N 371474.15 E 0.845 -7134.50
9511.33 62.640 182.120 5305.11 5357.61 7221.99 S 125.90 W 5967204.28 N 371469.97 E 0.775 -7218.78
~. 9606.36 63.240 181.850 5348.34 5400.84 7306.56 S 128.83W 5967119.76 N 371465.59 E 0.680 -7303.29
9704.68 63.600 181.910 5392.33 5444.83 7394.44 S 131.71 W 5967031.94 N 371461.21 E 0.370 -7391.11
9800.44 62.960 181.720 5435.39 5487.89 7479.93 S 134.42 W 5966946.51 N 371457.03 E 0.691 -7476.54
9895.61 61.570 180.500 5479.68 5532.18 7564.15 S 136.06 W 5966862.34 N 371453.96 E 1.849 -7560.72
9991.41 62.090 181.020 5524.91 5577.41 7648.59 S 137.18 W 5966777.92 N 371451.39 E 0.724 -7645.13
10086.70 62.640 181 . 160 5569.10 5621.60 7733.00 S 138.79 W 5966693.56 N 371448.34 E 0.592 -7729.49
10184.83 63.940 179.120 5613.21 5665.71 7820.65 S 138.99 W 5966605.92 N 371446.64 E 2.281 -7817.13
10279.99 64.490 179.160 5654.61 5707.11 7906.32 S 137.71 W 5966520.24 N 371446.46 E 0.579 -7902.81
10375.68 63.330 178.460 5696.69 5749.19 7992.24 S 135.92 W 5966434.30 N 371446.77 E 1.379 -7988.75
10471.45 61.950 178.170 5740.70 5793.20 8077.26 S 133.42 W 5966349.26 N 371447.81 E 1 .466 -8073.80
10566.73 61.110 177.760 5786.12 5838.62 8160.96 S 130.45 W 5966265.51 N 371449.35 E 0.959 -8157.54
10661.42 61.380 177.180 5831.68 5884.18 8243.89 S 126.79 W 5966182.53 N 371451.60 E 0.608 -8240.52
10758.06 61.750 177.200 5877.69 5930.19 8328.77 S 122.62 W 5966097.59 N 371454.31 E 0.383 -8325.46
10850.61 62.260 177.550 5921.13 5973.63 8410.41 S 118.88 W 5966015.91 N 371456.66 E 0.644 -8407.14
10949.02 62.700 178.900 5966.61 6019.11 8497.64 S 116.18 W 5965928.64 N 371457.87 E 1.296 -8494.41
11042.97 63.040 180.130 6009.45 6061.95 8581.25 S 115.47 W 5965845.04 N 371457.14 E 1 .220 -8578.02
11139.56 62.980 182.510 6053.29 6105.79 8667.28 S 117.45 W 5965759.04 N 371453.69 E 2.197 -8664.01
~. 11232.41 63.450 187.100 6095.15 6147.65 8749.85 S 124.40 W 5965676.61 N 371445.33 E 4.442 -8746.44
11330.54 64.020 187.250 6138.58 6191.08 8837.16 S 135.39 W 5965589.50 N 371432.85 E 0.597 -8833.55
11425.30 64.560 186.590 6179.68 6232.18 8921.91 S 145.68 W 5965504.93 N 371421.11 E 0.848 -8918.12
11524.62 64.570 186.960 6222.34 6274.84 9010.98 S 156.26 W 5965416.06 N 371409.01 E 0.337 -9006.99
11617.09 61 .790 184.790 6264.06 6316.56 9093.05 S 164.72 W 5965334.15 N 371399.14 E 3.664 -9088.91
11711.58 60.260 184.330 6309.84 6362.34 9175.45 S 171.30W 5965251.87 N 371391.16 E 1.674 -9171.18
11808.15 60.400 180.900 6357.65 6410.15 9259.25 S 175.12 W 5965168.15 N 371385.90 E 3.089 -9254.90
11903.88 60.830 181.380 6404.62 6457.12 9342.65 S 176.78 W 5965084.79 N 371382.81 E 0.627 -9338.26
11997.49 61 .250 180.650 6449.95 6502.45 9424.54 S 178.23 W 5965002.94 N 371379.96 E 0.817 -9420.11
31 December, 2002 - 11:04
Page 5 of 8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
12094.54 61.370 179.390 6496.54 6549.04 9509.67 S 178.26 W 5964917.82 N 371378.48 E 1.146 -9505.23
12189.97 60.910 181.120 6542.60 6595.10 9593.25 S 178.63 W 5964834.26 N 371376.68 E 1.659 -9588.79
12285.59 60.950 181.030 6589.06 6641.56 9676.81 S 180.20 W 5964750.74 N 371373.68 E 0.092 -9672.31
12380.87 60.800 178.950 6635.44 6687.94 9760.03 S 180.18 W 5964667.53 N 371372.27 E 1.913 -9755.52
~, 12476.39 60.320 179.450 6682.39 6734.89 9843.21 S 179.02 W 5964584.34 N 371372.01 E 0.678 -9838.71
.'
12571.80 60.200 179.240 6729.72 6782.22 9926.05 S 178.08 W 5964501.50 N 371371.54 E 0.229 -9921.55
12667.51 60.130 180.010 6777.34 6829.84 10009.07 S 177.53 W 5964418.48 N 371370.66 E 0.702 -10004.57
12762.55 60.590 179.480 6824.34 6876.84 10091.67 S 177.16 W 5964335.89 N 371369.62 E 0.685 -10087.16
12858.10 60.950 178.700 6871.00 6923.50 10175.04 S 175.84 W 5964252.50 N 371369.52 E 0.806 -10170.55
12951.75 61.240 178.530 6916.26 6968.76 10257.00 S 173.86 W 5964170.52 N 371370.10 E 0.348 -10252.53
13048.85 61.820 178.300 6962.55 7015.05 10342.33 S 171.50 W 5964085.17 N 371371.00 E 0.633 -10337.88
13143.77 63.750 175.990 7005.96 7058.46 10426.62 S 167.28 W 5964000.82 N 371373.77 E 2.969 -10422.23
13239.50 66.450 174.040 7046.27 7098.77 10513.11 S 159.72 W 5963914.21 N 371379.85 E 3.372 -10508.84
13334.85 68.990 171.500 7082.42 7134.92 10600.62 S 148.60 W 5963826.52 N 371389.47 E 3.629 -10596.53
13429.25 71.010 168.290 7114.71 7167.21 10687.93 S 133.02 W 5963738.96 N 371403.55 E 3.845 -10684.09
13525.78 73.850 165.810 7143.86 7196.36 10777.59 S 112.39 W 5963648.96 N 371422.65 E 3.828 -10774.10
13621.20 77.030 162.500 7167.85 7220.35 10866.41 S 87.16 W 5963559.72 N 371446.36 E 4.730 -10863.33
13717.29 79.420 158.190 7187.46 7239.96 10954.96 S 55.51 W 5963470.64 N 371476.48 E 5.046 -10952.41
13812.49 81.790 155.920 7203.00 7255.50 11041.44 S 18.90 W 5963383.55 N 371511.61 E 3.425 -11039.50
13907.97 82.340 153.350 7216.19 7268.69 11126.88 S 21.61 E 5963297.43 N 371550.65 E 2.727 -11125.62
14003.79 83.590 152.030 7227.92 7280.42 11211.38 S 65.24 E 5963212.20 N 371592.83 E 1.890 -11210.85
.'-" 14099.36 84.520 151.680 7237.82 7290.32 11295.19 S 110.08 E 5963127.63 N 371636.23 E 1.039 -11295.42
14234.76 87.600 148.450 7247.13 7299.63 11412.22 S 177.48 E 5963009.47 N 371701.61 E 3.292 -11413.58
14334.21 88.150 147.240 7250.81 7303.31 11496.35 S 230.37 E 5962924.44 N 371753.06 E 1.336 -11498.61
14429.65 86.370 149.520 7255.38 7307.88 11577.52 S 280.34 E 5962842.43 N 371801.64 E 3.029 -11580.62
14525.14 87.230 148.550 7260.71 7313.21 11659.27 S 329.40 E 5962759.85 N 371849.29 E 1.356 -11663.20
14620.80 86.550 150.220 7265.90 7318.40 11741.47S 378.04 E 5962676.83 N 371896.52 E 1.883 -11746.22
14716.33 87.540 150.010 7270.82 7323.32 11824.19 S 425.57 E 5962593.31 N 371942.63 E 1.059 -11829.74
14810.62 86.800 154.470 7275.48 7327.98 11907.50 S 469.43 E 5962509.26 N 371985.05 E 4.789 -11913.79
14902.30 87.230 154.260 7280.25 7332.75 11990.05 S 509.04 E 5962426.05 N 372023.24 E 0.522 -11997.00
31 December, 2002 - 11:04
Page 60f8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD-2 - CD2-37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
15001.84 88.580 153.460 7283.89 7336.39 12079.34 S 552.86 E 5962336.02 N 372065.53 E 1.576 -12087.03
15095.62 90.680 157.220 7284.50 7337.00 12164.55 S 591.98 E 5962250.15 N 372103.19 E 4.592 -12172.89
15192.07 89.260 157.030 7284.55 7337.05 12253.41 S 629.47 E 5962160.66 N 372139.15 E 1.485 -12262.38
15286.84 89.690 156.980 7285.42 7337.92 12340.65 S 666.49 E 5962072.81 N 372174.68 E 0.457 -12350.24
.~, 15384.17 90.250 153.440 7285.47 7337.97 12428.99 S 707.29 E 5961983.78 N 372213.96 E 3.682 -12439.27
15479.38 90.180 151.930 7285.11 7337.61 12513.58 S 750.98 E 5961898.45 N 372256.20 E 1.588 -12524.60
15575.09 90.180 150.820 7284.81 7337.31 12597.59 S 796.83 E 5961813.67 N 372300.60 E 1.160 -12609.38
15670.86 92.340 149.550 7282.70 7335.20 12680.66 S 844.44 E 5961729.80 N 372346.78 E 2.616 -12693.25
15764.40 93.450 149.900 7277.98 7330.48 12761.34 S 891.53 E 5961648.33 N 372392.49 E 1.244 -12774.72
15860.73 90.680 148.460 7274.51 7327.01 12844.00 S 940.85 E 5961564.83 N 372440.38 E 3.240 -12858.21
15955.66 89.020 145.650 7274.76 7327.26 12923.65 S 992.47 E 5961484.31 N 372490.63 E 3.438 -12938.74
16049.47 89.140 145.560 7276.26 7328.76 13001.05 S 1045.45 E 5961406.01 N 372542.29 E 0.160 -13017.03
16146.20 89.570 145.140 7277.35 7329.85 13080.62 S 1100.45 E 5961325.52 N 372595.91 E 0.621 -13097.53
16242.04 90.120 145.570 7277.61 7330.11 13159.47 S 1154.93 E 5961245.75 N 372649.04 E 0.728 -13177.30
16338.82 90.680 144.810 7276.94 7329.44 13238.93 S 1210.18 E 5961165.36 N 372702.91 E 0.975 -13257.69
16434.25 91.110 144.620 7275.45 7327.95 13316.81 S 1265.29 E 5961086.54 N 372756.69 E 0.493 -13336.51
16529.45 90.680 149.820 7273.96 7326.46 13396.82 S 1316.81 E 5961005.67 N 372806.83 E 5.480 -13417.38
16623.18 92.400 150.820 7271.44 7323.94 13478.22 S 1363.21 E 5960923.48 N 372851.83 E 2.122 -13499.56
16720.21 92.770 150.790 7267.06 7319.56 13562.83 S 1410.49 E 5960838.07 N 372897.65 E 0.383 -13584.97
16815.70 93.450 150.540 7261.88 7314.38 13645.96 S 1457.20 E 5960754.16 N 372942.94 E 0.759 -13668.88
16911.29 93.760 149.480 7255.87 7308.37 13728.58 S 1504.88 E 5960670.73 N 372989.20 E 1.153 -13752.31
~. 17003.94 94.130 149.590 7249.50 7302.00 13808.25 S 1551.75 E 5960590.27 N 373034.70 E 0.417 -13832.77
17085.00 94.130 149.590 7243.66 7296.16 13877.98 S 1592.67 E 5960519.86 N 373074.42 E 0.000 -13903.19 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.5' MSL. Northings and Eastings are relative to 1934' FNL, 1519' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1934' FNL, 1519' FEL and calculated along an Azimuth of 359.020° (True).
Magnetic Declination at Surface is 24.788°(02-Nov-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 17085.00ft.,
The Bottom Hole Displacement is 13969.07ft., in the Direction of 173.453° (True).
31 December, 2002 - 11:04
Page 7 of 8
DrillQuest 3.03.02.004
Sperry-Sun Drilling Services
Survey Report for Alpine CD.2 . CD2.37 MWD
Your Ref: 501032043400
Job No. AKMW22175, Surveyed: 25 November, 2002
North Slope, Alaska
Alaska North Slope
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
17085.00
7296.16
13877.98 S
1592.67 E
Projected Survey
Survey tool program for CD2-37 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
611.00
0.00 611.00
608.78 17085.00
608.78 Tolerable Gyro(CD2-37 GYRO)
7296.16 MWD Magnetic(CD2-37 MWD)
~
31 December, 2002 - 11:04
Page 8 of 8
DrillQuest 3.03.02.004
CD2-37 tubing size change
)
)
Subject: CD2-37 tubing size change
Date: Tue, 12 Nov 2002 16:42:16 -0900
From: "Vernon T Johnson" <vjohnso1@ppco.com>
To: winton_aubert@admin.state.ak.us
~D[-1.'1
Winton,
We are planning to use a 3-1/2" completion on CD2-37. The Permit to Drill
indicates a 4-1/2" completion, but due to expected production rates there
has been a change of plans.
If you need further details or have any questions, please call.
Vern Johnson
907-265-6081 (w)
907-265-1515 (fax)
907-748-3906 (Cell)
vjohnso1@ppco.com
)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Mike Bill, fAl/tI DATE: November 10, 2002
Commissioner
THRU: Tom Maunder, 1J?}TYj
P. I. Supervisor \\h-?,O:ì'.
FROM: Chuck Scheve, SUBJECT: Casing. Cement Top Job
Petroleum Inspector CRU CD2-37
PTD#202-211
Sunday, November 10, 2002; I traveled to the CD2-37 well in the Alpine field
and witnessed the cement Top Job on the Surface casing in this well.
During the primary cement job Qn this well partial lost circulation was
encountered with no cemenfreturnsnoted at surface. 1 II tubing was run in the
hole outside the surface casing to a depth of 355')belowground level were the
pipøtagg.ed up solid. From this depth 500 sx arctic set 1 (82 bbI15.7ppg)and
135 sx arctic set light (89 bbl 10.7 ppg) was pumped with no cement returns to
slJrface. After having more cement delivered from the CD1 location the 1 "pipe
was rerun this time tagging up at 82'(16" conductor at 80'). 20sx arctic set light
was pumped from this depth with full weight cement returns at surface.
SUMMARY: I witnessed the placement of a cement Top Job on the Surface
casing in the CD2-37 well in the Alpine field.
Attachments: None
NON-CONFIDENTIAL
CD2-37 Diverter Waiver
)
)
Subject: CD2-37 Diverter Waiver
Date: Mon, 21 Oct 200209:34:08 -0800
From: Winton Aubert <Winton - Aubert@admin.state.ak.us>
Organization: AOGCC
To: Vernon T Johnson <vjohnso1@ppco.com>
VerD,
Per 20 AAC 25.035 (h) (2) I AOGCC hereby waives the diverter requirement for well
CD2-37 (PTD 202-211). All other permit stipulations apply.
Winton Aubert
AOGCC
793-1231
)
)
~lT!Æ 1fŒ (ill
TONY KNOWLES, GOVERNOR
A.I~A.SIiA. OIL AND GAS
CONSERVATION COMMISSION
Chip Alvord
Drilling Team Leader
ConcocoPhillip
PO Box 100360
Anchorage AK 99510
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Colville River Unit CD2-37
ConocoPhillips
Permit No: 202-211
Surface Location: 1934' FNL, 1519' FEL, Sec. 2, TIIN, R4E, UM
Bottomhole Location: 241' FNL, 132' FWL, Sec. 24, TIIN, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for pennit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional pennits or approvals reqùired
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
b~:o~~
Chair
BY ORDER OE THE COMMISSION
DATED this~ay of October, 2002
cc: .
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
10/1#0 L
4/~(-a.... 2--
/Ø/IS-/() '2-
lN6Á-
.J1t'
Mt.-ó
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1 b Type of Well Exploratory
Service Development Gas
5. Datum Elevation (DF or KB)
DF52'
6, Property Designation
ADL 380075 & 380077
7, Unit or property Name
Colville River Unit
8. Well number
CD2-37 ~
9. Approximate spud date
10/23/2002 /
14. Number of acres in property
Stratigraphic Test Development 011 X
Single Zone X Multiple Zone
10. Field and Pool
Colville River Field I"
Alpine Oil Pool
Drill X
Re-Entry
Name of Operator
Phillips Alaska, Inc.
Address
P. O. Box 100360, Anchorage, AK 99510-0360
location of well at surface
Redrill
Deepen
1a. Type of Work
2.
feet
3.
11. Type Bond <see 20 MC 25.025)
Statewide
Number
4.
1934' FNL, 1519' FEL, Sec. 2, T11N, R4E, UM
At target (=7" casing point )
2592' FSL, 1378' FEL, Sec. 14, T11N, R4E, UM
At total depth
#59-52-180
Amount
$200,000
15. Proposed depth (MO and TVO)
17319'
7240' TVD
241' FNL, 132' FWL, Sec. 24, T11N, R4E, UM
12. Distance to nearest 13. Distance to ne¡arest'well
Property line CD2-38
Crosses from feet 11' at 300'
380075 tp 380077
16. To be completed for deviated wells
Kickoff depth 200' feet Maximum hole angle
feet
Feet
2560
17. Antioipated pressure (see 20 MC 25.035(eX2»
Maximum surface 2547 / pslg At totCIl depth (TVO)
1110
3253 at pslg
7188'
TVD.SS
Settir'yJ Depth
18. Casing program
size
Hole
421'
12.25"
8.5"
NIA
Quantity of cement
Qnclude stage data)
Pre installed
561 Sx Arcticset III L &
230 Sx Class G
324 Sx Class G
Tubing
Bottom
TVD
114'
2390'
7272'
7062'
Toy
Specifications
. Casing Weight Grade COupling Length
16" 62.5# H-40 Weld 77'
9.625" 36# J-55 BTC 3048
TVD
37'
37'
MD
114'
3085
MD
37'
37'
/'
/'
14091 '
13212'
BTC-M 14035' 37'
IBT -mod 13180' 32'
37'
32'
7" 26# L-80
4H 12.6# L-80
~ e S" it \t";,*,"
To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
19.
Plugs (measured)
feet
feet
Junk (measured)
feet
feet
measured
true vertical
Effective depth:
R HrØ~¥E I}rue Vertical depth
OCT 11 2002
Cemented
Length
Size
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
AJasIfI on & Gø ConI. Commissiørl
. Anehorage
measured
true vertical
Perforation depth:
Drilling program X
20 MC 25.050 requirements X
Diverter Sketch
Seabed report
20. Attachments Filing fee X Property plat BOP Sketch
Drilling fluid program X Time vs depth plot Refraction analysis
21. I hereby certify that the foregoing is true and correct to the best of m¡ knowledge
.~1-~
Date (,,{ I~I \] <...
Title Drilling Team Leader
Commission Use Only
Permit Number I API number 6- LJ . I Approval date '-r-..~\~-l- '"" I See cover letter for
.2.c ~ - .2.. /1 50- /0 ~ - 2.. 0 r.;> ~/ LJ ~ l ~Other ~uirements
Conditions of approval SamPles required Yes rNiJ) Mud log requ d - Yes &
Hydrogen sulfide measures Yes & VDirectional survey required (9 No
Required working pressure for BOPE 2M 3M 5M 10M 15M
Other: 'TëS +- E 0 pt;;- fo 5000 {)!' ¿ ,
Ooglnal Slgnå:í By
Cammy OechsIi T aylot-
Signed
~\ 01J§:~~
by order of
the commission
Commissioner
Approved by
Form 10-401 Rev. 7-24-89
O,=,'GIMAt
')
)
CD2.37 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: .Detailed Risk Infonnation for further discussion of these risks)
12-1/4" Hole /9.&/8" Casina Interval
Event Risk Level
CondudorBroach Low
Well Collision Low
Gas Hydrates Low
Running Sands and Gravel
Low
Abnormal Pressure in
Surface Formations
>2000' TVD
Lost Circulation
Low
Low
8-1/2" Hole /7" Casina Interval
Event Risk Level
Abnormal Pressure in low
Surface Formations
>2000' TVD
Lost circulation
Low
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
low
Hydrogen Sulfide gas
Low
MitiQation Strateay
Monitor cellar continuously during interval.
Gyro single shots as required
Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
increased mud weight
Reduced pump rates, mud rheology, lost circulation
material, use of low density cement slurries
Mitiøation Strateay
BOPE drills, Keep mud weight above 9.6 ppg.
Check for flow during connections and if needed,
increase mud weight.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring,
mud rheology, lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECD) monitoring, weighted
sweeps.
Well control drills, increased mud weight. No
mapped faults occur within 700' of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
~
6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation Low
Hole swabbing on trips
Moderate
" Abnormal Reservoir
Pressure
Medium
Hydrogen Sulfide gas
Low
Mitiaation Strateay
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring,
mud rheology, lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECD)
monitoring, weighted sweeps.
BOPE drills, Keep mud weight above 8.9 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud weight.
H:z$ drills, detection systems, alarms, standard well
control practices, mud scavengers
/
/
OF;.., "';: A '
.. ¡~î' \J ¡ (Jfi~
)
)
Alpine: CD2.37
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Procedure
Move on Doyon 19.
Drill 12 %" hole to the surface casing point as per the directional plan.
Run and cement 9 5/8" surface casing. /
Install and test BOPE to minimum 5000 psi. /
Pressure test casing to 2500 psi.
Drill out 20' of new hole. Perform leak off test.
Drill 8 %" hole to the intermediate casing point in the Alpine Sand. (LWD tools, GRlRES/PWD/Acoustic /'
caliper)
Run and cement 7" casing as per program. Top of cement +1- 1190 feet MD above Alpine reservoir. Carry /
out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the
casing shoe. Freeze protect casing annulus.
Run drilling assembly.
Pressure test casing to 3500 psi.
/
Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling
ahead is 11.5 ppg EMW.
/
Swap fluid to mineral oil based drilling mud.
Drill 6-118" horizontal section to well TD. (LWD: GRlRESlPWD)
1 ~ ilt. " \.JG\- /
Run.4-W; 12.6 #, L-80 tubing with SSSV nipple, gas lift mandrels, sliding sleeve and production packer.
Land hanger.
Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
Circulate diesel in tubing and annulus.
Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi /30 mins.
Set BPV and secure well. Move rig off.
J JIG..lt~/. ~L
,1/ . ItÞ.L
)
)
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD2-38 will be the closest well to CD2-37, 11.0' at 300' MD. Accounting for survey
tool inaccuracies, the ellipse separation between these wells will be 5.8' at 300' MD. /"
Drillina Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated.
Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking
swabbed kicks. .
~nnular PumDina Ooerations:
Incidental fluids developed from drilling operations on well CD2-37 will be injected into a permitted annulus
on CD2 pad or the class 2 disposal well on CD1 pad. Incidental fluids to include oil based mud using
mineral oil as the base fluid.
The CD2-37 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
We request that CD2-37 be permitted for annular pumping of fluids occurring as a result of drilling
operations, per regulation 20 AAC 25.080. As stated above, any zones containing significant hydrocarbons
will be Isolated prior to initiating annular pumping. There will be no USDWs open below the shoe or
potablelindustrial water wells within one mile of the receiving zone. Reference the enclosed directional
drilling plan for other formation markers in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick
shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) '" (0.052) '" (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) '" (0.052) '" (2390') + 1 ,500 psi
= 2,991 psi
= 1 ,081 psi
Pore Pressure
/0'--:>,"\
i'.' )
Therefore Differential = 2991 - 1 081 ~Si.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken
into consideration. The surface and intermediate casing strings exposed to the annular pumping
operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
\Nt
OD (ppf) Grade Range
9-5/8" 36 J-55 3
7" 26 L-80 3
Connection
Type Collapse
BTC.I / 2,020 psi
J-
BTC-Mod 5,410 psi
85% of
Collapse
1,717 psi
4.599 Dsi
/
Burst
3,520 psi
7,240 psi
85% of
Burst
2.992 psi /
6,154 psi
J JIG.. '^:I A..'
.1 ;d(~h~
CD2-37
DRILUNG FLUID PROGRAM
Density
PV
YP
Funnel Viscosity
Initial Gels
10 minute gels
API Filtrate
HPHT Fluid Loss at
160
PH
Electrical Stability
Oil /water ratio
Surface Hole:
)
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 %" Section - 6 1/8"
point -12 Xi"
8.8 - 9.6 ppg 9.6 - 9.8 ppg / 9.1 ppg
10 - 25 15 -20
20 - 60 15 - 25 18 -25
100 - 200
4-8 NA
<18 9-12
NC -10 cc/30 min 4 - 12 cc/30 min (drilling) NA
4.0-5.5
8.5-9.0 9.0 -10.0 NA
+800Vts
80/20
A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep
~owline viscosity at :t: 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material.
Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section:
The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based
drill-in fluid. The base fluid will consist of high flash point (>200 F) mineral oil with 25% by weight calcium
chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation
damage.
0,1/ G I
L
')
Colville River Field
CD2-37 Production Well Completion Plan
-
Î
!
¡
!
i
-
16" Conductor to 114'
Updated 10/09/02
...1
4-112" Cameo BAL-O SSSV Nipple (3.812" ID) at 2000' TVD=2272' MD
Isolation Sleeve with DB-6 No-Go Lock (3.812" OD) run in profile
Dual 1/4" x 0.049" s/s control lines
9-518" 36 ppf J-55 BTC
Surface Casing
@ 3085' MD /2390' TVD
cemented to surface
WRDP-2 SSSV (2.125"ID) w/ DB-6
No-Go Lock (3.812" OD) - to be
installed later
!!..J
Camço KBG-2 GLM (3.909" 10)
at 3400 TVO for
E Oummywith 1" BK-2 Latch
PAcker Fluid mix:
niesel in tUbinQ and Annulus
-r- 'I ".at W'GA-
A.4Ii» 12.6 ppf L-8Q IBT Mod. R3
tubing run with Jet Lube Run'n'Seal
pipe dope
L I {J.\-
;/~.. ~
Completion ~. ~ .MQ
~
Tubing Hanger
t4-112", 12.6#/ft, IBT-Mod Tubing
Cameo BAL-O SSSV Nipple
~', 12.6#/ft,IBT-Mod Tubing
Cameo KBG-2 GLM (3.909" ID)
4M2" , 12.6#/ft, IBT-Mod Tubing
Cameo KBG-2 GLM (3.909" ID)
~,12.6#/ft, IBT-Mod Tubing
Cameo KBG-2 GLM (3.909" ID)
4-..JKtubing joints (2)
Baker 4-112" CMD sliding sleeve
with 3.813 'X' Profile
~ tubing joint (2)
Baker 83 Packer
with mlllout extension
~, tubing joints (2)
HES "XN" (3.725" ID)-62.8° ine
~, 10' pup joint
WEG
Cameo KBG-2 GLM (3.909" 10)
at 5700' TVO for
E Dummy with 1" BK-2 Latch
Cameo KBG-2 GLM ()æ9. 10)
2 joints above sliding sleeve
E Dummy with 1" BK-2 Latch
/
TOC @ +1- 11895' MD 16455' TVO
(1190' MO above top Alpine C)
Top Alpine C at 13893' MD /7272' TVD ~')!-'
7" 26 ppf L-80 BTC Mod
Production Casing @ 14091' MD /7292' TVD @ sro
-
.DlQ
32'
32'
2272' 2000'
5274' 3400'
10258' 5700'
12890' 6914'
13000' 6965'
13100' 7011'
13200' 7057'
13212' 7062'
Well TD at
17319' MD I
7240' TVD
C 1:G/^J, ~I
¡ 1 II . ", f'L.
)
)
CD2-37
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 (c) (3,4) and as required in 20 ACC 25.035 (d) (2»
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (lbs.1 (psi) (psi)
MDITVD(ft) gal)
16 114/114 10.9 52 53
9 5/8 2570 /2390 14.2 1081 1526
7" 14091/7292 16.0 3300 2547 /
NIA 17319/7240 16.0 3276 NIA
.
NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Iblgal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
1.
ASP CALCULATIONS
Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390') = 842 psi
Drilling below surface casing (9 5/8")
2.
ASP = [(FG x 0.052) - 0.1] D
= [(14.2 x 0.052) - 0.1] x 2390 = 1526 psi
OR
ASP = FPP - (0.1 x D) /
= 3276 - (0.1 x 7292') = 2547 psi
3.
Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3300 - (0.1 x 7240') = 2576 psi /
0 ~.. q ,f'1 l ,:!.': "A. L
f 1.0'
.. . I VI I d I"! ...
)
Alpine. CD2-37 Well Cementlna Reauirements
9 6/8" Surface Casing run to 3086' MD I 2390' TVD.
Cement from 3086' MD to 2686' (600' of fill) with Class G + Adds @ 16.8 PPG, and from 2686' to
surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 60% excess
below the permafrost.
(2585'-1630') X 0.3132 ft3/ft X 1.5 (50% excess) = 448.7 fe below permafrost
1630' X 0.3132 ft3/ft X 4 (300% excess) = 2042.1 ft3 above permafrost
Total volume = 448.7 + 2042.1 = 2490.8 ft3 => 561 Sx @ 4.44 tf/sk
5~;~ ArcticSet Lite 3 @ 10.7 PPG Yielding;'4:~;:~lk, Class G + 30% D053 thixotropic
-,additive, 0.6% 0046 antifoamer, 1.5% 0079 extender, 1.5% S001 accelerator, 50% 0124
extender and 9% BWOW1 0044 freeze suppressant
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 tf/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk
--)
/
'2~0 Sx Class G + 0..2"o-DO~6 antifoamer, 0.3% 0065 dispersant and 1% SOO1 accelerator
..,@ 15.8 PPG yieldi~sf 1 Jpft3/sk
\~~""""~~
7" Intermediate Casing run to 13893' MD /7272' TVD
Lead slurry:
System:
Tail slurry:
System:
Cement from 13893' MO to +1- 11895' MO (minimum 1190' MO above top of Alpine formation) with Class G
+ adds @ 15.8 PPG. Assume 40% excess annular volume.
Slurry:
System:
(13893'-11895') X 0.1268 ft3/ft X 1.4 (40% excess) = 354.7 tfannular volume
80' X 0.2148 tf/ft = 17.2 tf shoe joint volume
Total volume = 354.7 + 17.2 = 371.9 ft3 => 324 Sx @ 1.15 ft3/sk
íi~x Class G + 0.2% D046 antifoamer, 0.25% D065 dÍ!IPerI\!nt, 0.25% D800 retarder
ì,~nd 0.18% 0167 fluid loss additive @ 15.8 PPG Yieldi~~1t3/sk
1 By Weight Of mix Water, all other additives are BWOCement
Sperry-Sun Drilling Services
Alaska Nort
North Slope,-~~.
C
~ C02-37 (wp05)
Proposal Report
2 October, 2002
a
=0
Your Ref: Horizontal with upward ftaverse @ TO
Surface Coordlnstes: 5974423.05 N, 371719.40 E (70020' 18.0790H N, 151002' 27.2973n W)
Grid Coordinste System: NAD27 Alaslcs State Planes, Zone 4
Surlsce Coordinates relative to Project H Reference: 974423.05 N, 12B2BO.60 W (Grid)
Surlsce Coordinstes relative to Structure: 19.82 S, 2.25 E(True}
Kelly Bushing: 52.(J(ff above Mean Sea Level
Elevstlon telstlve to Project V Reference: 52.(J(ff
Elevstion relative to Structure: 52.00ft
4~.e-i'.;-~
-':~;;.,,;~~
f ---.
~-.. ..,
I)~IL\ ,,,G 8t.rty;,~"!I
A HalMburtoø Company
'-'
Propossl Ref: pro99BO
Sperry-Sun Drilling Services
Proposal Report tor Alpine CD.2 . Plan: CD2-37. CD2-37 (Wp05)
Your R"t: Horlzontal with upward flaW,." fiþ TO
R"vIs«I: 2 OctobtÞr, 2003
North Slope, Alaska
Alaska North Slope
Measured SUb-Sea Vertical Local Coordinates Global Coordlna
Depth IneL Azlm. Depth Depth Norlhlngs Eastlngs Northlngs Comment
(ft) (ft) (It) (It) (ft) (It)
0.00 0.000 0.000 -52.00 0.00 O.OON O.OOE 0.00 SHl
100.00 0.000 0.000 48.00 100.00 O.OON O.ooE 0.000 0.00
200.00 0.000 0.000 148.00 200.00 O.OON O.ooE 0.000 0.00 Begin Dir @ 2.5°/100ftin 12-1/4" Hole
200.000 MD, 200.000 TVD
300.00 2.500 270.000 247.97 299.97 371717.22 E 2.500 -1.03
400.00 5.000 270.000 347.75 399.75 371710.68 E 2.500 -4.11 .~
440.00 6.000 270.000 387.56 439.56 5974423.26 N 371706.85 E 2.500 -5.91 Increase in Dir Rate @ 3.0°/1000:
440.000 MD, 439.56ft TVD
500.00 6.158 253.006 447.23 5974422.43 N 371700.62 E 3.000 -8.01
600.00 7.449 229.887 546.54 5974416.86 N 371690.43 E 3.000 -7.69
700.00 9.538 215.161 645.45 5974406.07 N 371680.51 E 3.000 -2.62
800.00 12.017 206.054 743.69 5974390.11 N 371670.89 E 3.000 7.21
900.00 14.689 55.03 S 56.87 W 5974369.00 N 371661.60 E 3.000 21.76
1000.00 17.466 81.37 S 65.37 W 5974342.81 N 371652.65 E 3.000 40.99
1100.00 20.305 112.70S 73.41 W 5974311.62 N 371644.07 E 3.000 64.84
1200.00 23.183 148.96 S 80.97 W 5974275.50 N 371635.89 E 3.000 93.26
1300.00 26.087 190.03 S 88.03 W 5974234.55 N 371628.13 E 3.000 126.17
1400.00 1356.09 235.81 S 94.57 W 5974188.90 N 371620.81 E 3.000 163.47
1500.00 1442.27 286.16 S 100.57 W 5974138.65 N 371613.95 E 3.000 205.06
1600.00 1525.73 340.96 S 106.01 W 5974083.95 N 371607.57 E 3.000 250.84
1700.00 1606.24 400.05 S 110.89 W 5974024.96 N 371601.69 E 3.000 300.66
1800.00 1683.59 463.26 S 115.18 W 5973961.83 N 371596.31 E 3.000 354.41
1900.00 43.766 182.813 1705.56 1757.56 530.43 S 118.87 W 5973894.73 N 371591.47 E 3.000 411.92
C) 2000.00 46.734 182.192 1775.96 1827.96 601.38 S 121.96 W 5973823.85 N 371587.16 E 3.000 473.04 .~
2100.00 49.704 181.629 1842.58 1894.58 675.89 S 124.44 W 5973749.38 N 371583.41 E 3.000 537.61
::J:J 2200.00 52.677 181.113 1905.25 1957 25 753.79 S 126.30 W 5973671.53 N 371580.22 E 3.000 605.45
"""'-- 2300.00 55.652 180.636 1963.79 2015.79 834.84 S 127.53 W 5973590.52 N 371577.61 E 3.000 676.37
~~ 2400.00 58.629 180.193 2018.04 2070.04 918.83 S 128.13 W 5973506.55 N 371575.57 E 3.000 750.17
~?;:Ô--;O-',:'¿r- 2500.00 61.607 179.776 2067.85 2119.85 1005.52 S 128.10 W 5973419.87 N 371574.11 E 3.000 826.66
)'SI 2530.66 62.521 179.653 2082.22 2134.22 1032.61 S 127.97 W 5973392.78 N 371573.78 E 3.000 850.62 End Dir, Start Sail @ 62.52° : 2530.66
""""".:.;>--,.~-"l't MD, 2134.22ft TVD
2600.00 62.521 179.653 2114.21 2166.21 1094.12 S 127.60 W 5973331.27 N 371573.10 E 0.000 905.06
~'---- 2700.00 62.521 179.653 2160.36 2212.36 1182.84 S 127.06 W 5973242.56 N 371572.12 E 0.000 983.57
2 October, 2tI02 - 14:44
Page 2 of 10
OtllQuest 3.tJ3.02.oo3
Sperry-Sun Drilling Services
Propossl Report to, Alpine CD.2 . Plan: CD2-37. CD2-37 (wpDS)
Your R.t: HorizontJJl with upward tmver. €I TO
R.vlsIJd: 2 OctolHw, 2003
North SloptJ, Alaska
Alaska Notfh SloptJ
Measured Sub-Sea Vertical Local Coordinates Global Coordina
Depth IncL Azlm. Depth Depth Northings EasUngs Northlngs Comment
(ft) (ft) (ft) (ft) (It) (It)
2800.00 62.521 179.653 2206.50 2258.50 1271.56 $ 126.52 W 0.000 1062.08
2900.00 62.521 179.653 2252.64 2304.64 1360.27 $ 125.98 W 0.000 1140.59
3000.00 62.521 179.653 2298.79 2350.79 1448.99 $ 125.45 W 0.000 1219.10
3084.98 62.521 179.653 2338.00 2390.00 1524.38 S 124.99 W 0.000 1285.83 9 518" Casing
3100.00 62.521 179.653 2344.93 2396.93 1537.70S 124.91 W 0.000 1297.62
.~
3200.00 62.521 179.653 2391.07 2443.07 371567.22 E 0.000 1376.13
3300.00 62.521 179.653 2437.21 2489.21 371566.24 E 0.000 1454.64
3400.00 62.521 179.653 2483.36 2535.36 371565.26 E 0.000 1533.15
3500.00 62.521 179.653 2529.50 2581.50 371564.28 E 0.000 1611.66
3600.00 62.521 179.653 2575.64 2627.64 371563.30 E 0.000 1690.17
3700.00 62.521 179.653 121.69 W 5972355.43 N 371562.32 E 0.000 1768.69
3800.00 62.521 179.653 121.15 W 5972266.72 N 371561.34 E 0.000 1847.20
3900.00 62.521 179.653 120.61 W 5972178.01 N 371560.36 E 0.000 1925.71
4000.00 62.521 179.653 120.08 W 5972089.30 N 371559.38 E 0.000 2004.22
4100.00 62.521 179.653 119.54 W 5972000.59 N 371558.39 E 0.000 2082.73
4200.00 2513.58 $ 119.00 W 5971911.87 N 371557.41 E 0.000 2161.25
4300.00 2602.30 $ 118.46 W 5971823.16 N 371556.43 E 0.000 2239.76
4400.00 2691.01 $ 117.93 W 5971734.45 N 371555.45 E 0.000 2318.27
4500.00 2779.73 S 117.39W 5971645.74 N 371554.47 E 0.000 2396.78
4600.00 2868.44 $ 116.85 W 5971557.02 N 371553.49 E 0.000 2475.29
4700.00 3083.22 3135.22 2957.16 S 116.32 W 5971468.31 N 371552.51 E 0.000 2553.80
4800.00 3129.36 3181.36 3045.88 S 115.78 W 5971379.60 N 371551.53 E 0.000 2632.32
4900.00 3175.50 3227.50 3134.59 $ 115.24 W 5971290.89 N 371550.55 E 0.000 2710.83
a 5000.00 3221.65 3273.65 3223.31 $ 114.70W 5971202.18 N 371549.57 E 0.000 2789.34
5100.00 3267.79 3319.79 3312.02 S 114.17W 5971113.46 N 371548.59 E 0.000 2867.85
::t:J 5200.00 62.521 179.653 3313.93 3365.93 3400.74 S 113.63 W 5971024.75 N 371547.61 E 0.000 2946.36
~"-~
-~ 5300.00 62.521 179.653 3360.08 3412.08 3489.46 $ 113.09 W 5970936.04 N 371546.63 E 0.000 3024.87
~,~~ ';,' 5400.00 62.521 179.653 3406.22 3458.22 3578.17 $ 112.56 W 5970847.33 N 371545.65 E 0.000 3103.39
~,~ 5500.00 62.521 179.653 3452.36 3504.36 3666.89$ 112.02 W 5970758.61 N 371544.67 E 0.000 3181.90
~--:~:~ 5600.00 62.521 179.653 3498.50 3550.50 3755.60 $ 111.48 W 5970669.90 N 371543.69 E 0.000 3260.41
. ~~'"~-
:k~
r---
2 OctolHlr, 2002 - 14:44
Psge30t10
DdlQuelll3.03.Ø2.ODS
Sperry-Sun Drilling Services
Proposs' Report tor Alpine CD-2 . Plan: CD2-37 . CD2-37 (wp05)
You,. Ref: Horizontal wIlh upWlll'd tJ'ave,... 0 TO
Revised: 2 October, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordlnat
Depth IneL Azlm. Depth Depth Northlngs Eastings Northlngs Comment
(ft) (ft) (ft) (ft) (ft) (ft)
5700.00 62.521 179.653 3544.65 3596.65 3844.32 S 110.94 W 0.000 3338.92
5800.00 62.521 179.653 3590.79 3642.79 3933.04 S 110.41 W 0.000 3417.43
5900.00 62.521 179.653 3636.93 3688.93 4021.75 S 109.87 W 0.000 3495.95
6000.00 62.521 179.653 3683.08 3735.08 4110.47 S 109.33 W 0.000 3574.46
6100.00 62.521 179.653 3729.22 3781.22 4199.18 S 108.80 W 0.000 3652.97
'~¡
6200.00 62.521 179.653 3775.36 3827.36 37.63 N 371537.80 E 0.000 3731.48
6300.00 62.521 179.653 3821.51 3873.51 5970048.92 N 371536.82 E 0.000 3809.99
6400.00 62.521 179.653 3867.65 3919.65 596996020 N 371535.84 E 0.000 3888.50
6500.00 62.521 179.653 3913.79 3965.79 5969871.49 N 371534.86 E 0.000 3967.02
6600.00 62.521 179.653 3959.94 4011.94 5969782.78 N 371533.88 E 0.000 4045.53
6700.00 62.521 179.653 105.57 W 5969694.07 N 371532.90 E 0.000 4124.04
6800.00 62.521 179.653 105.04 W 5969605.36 N 371531.92 E 0.000 4202.55
6900.00 62.521 179.653 104.50 W 5969516.64 N 371530.94 E 0.000 4281.06
7000.00 62.521 179.653 103.96 W 5969427.93 N 371529.96 E 0.000 4359.58
7100.00 62.521 179.653 103.42 W 596933922 N 371528.98 E 0.000 4438.09
7200.00 5175.06 S 102.89 W 5969250.51 N 371527.99 E 0.000 4516.60
7300.00 5263.78 S 102.35 W 5969161.79 N 371527.01 E 0.000 4595.11
7400.00 5352.49 S 101.81 W 5969073.08 N 371526.03 E 0.000 4673.62
7500.00 5441.21 S 101.28 W 5968984.37 N 371525.05 E 0.000 4752.13
7600.00 5529.92 S 100.74 W 5968895.66 N 371524.07 E 0.000 4830.65
7700.00 4467.51 4519.51 5618.64 S 10020 W 5968806.95 N 371523.09 E 0.000 4909.16
7800.00 4513.65 4565.65 5707.36 S 99.66 W 5968718.23 N 371522.11 E 0.000 4987.67
7900.00 4559.80 4611.80 5796.07 S 99.13 W 5968629.52 N 371521.13 E 0.000 5066.18
<:::) 8000.00 4605.94 4657.94 5884.79 S 98.59 W 5968540.81 N 371520.15 E 0.000 5144.69 .~/
:0 8100.00 4652.08 4704.08 5973.50 S 98.05 W 5968452.10 N 371519.17 E 0.000 5223.20
--- 8200.00 62.521 179.653 4698.22 4750.22 6062.22 S 97.52 W 5968363.38 N 371518.19 E 0.000 5301.72
~. 8300.00 62.521 179.653 4744.37 4796.37 6150.94 S 96.98 W 5968274.67 N 371517.21 E 0.000 5380.23
~""~ :) 8400.00 62.521 179.653 4790.51 4842.51 6239.65 S 96.44 W 5968185.96 N 37151623 E 0.000 5458.74
't;;.;!Q-:--+'';';:ttõ2~ 8500.00 62.521 179.653 4836.65 4888.65 6328.37 S 95.90 W 596809725 N 37151525 E 0.000 5537.25
, .~~--- 8600.00 62.521 179.653 4882.80 4934.80 6417.08 S 95.37 W 5968008.54 N 371514.27 E 0.000 5615.76
~---
2 October, 2ØD2 - 14:44
Page 4 of 10
OdlQuest 3.t13.tI2.(IJ3
Sperry-Sun Drilling Services
Propossl Report tor Alpine CD-2 . Plan: CD2-37 . CD2-37 (wp05)
Your Ref: Horlzon,., with upward tl'llverse (fþ TO
Revised: 2 October, 2003
NOIth Slope, Alaska
Alaska Notlh Slope
Measured Sub-Sea Vertical Local Coordinates
Depth lnet Azlm. Depth Depth Northlngs Eastlngs Comment
(It) (It) (It) (It) (It)
8700.00 62.521 179.653 4928.94 4980.94 6505.80 $ 94.83 W 0.000 5694.28
8800.00 62.521 179.653 4975.08 5027.08 6594.52 $ 94.29 W 0.000 5772.79
8900.00 62.521 179.653 5021.23 5073.23 6683.23 S 93.76 W 0.000 5851.30
9000.00 62.521 179.653 5067.37 5119.37 6771.95 S 93.22 W 0.000 5929.81
9100.00 62.521 179.653 5113.51 5165.51 6860.66$ 92.68 W 0.000 6008.32
~
9200.00 62.521 179.653 5159.66 5211.66 371508.38 E 0.000 6086.83
9300.00 62.521 179.653 5205.80 5257.80 371507.40 E 0.000 6165.35
9400.00 62.521 179.653 5251.94 5303.94 371506.42 E 0.000 6243.86
9500.00 62.521 179.653 5298.08 5350.08 371505.44 E 0.000 6322.37
9600.00 62.521 179.653 5344.23 5396.23 371504.46 E 0.000 6400.88
9700.00 62.521 179.653 89.46 W 5967032.70 N 371503.48 E 0.000 6479.39
9800.00 62.521 179.653 88.92 W 5966943.99 N 371502.50 E 0.000 6557.90
9900.00 62.521 179.653 88.38 W 5966855.28 N 371501.52 E 0.000 6636.42
10000.00 62.521 179.653 87.85 W 5966766.57 N 371500.54 E 0.000 6714.93
10100.00 62.521 179.653 87.31 W 5966677.85 N 371499.56 E 0.000 6793.44
10200.00 7836.54 $ 86.77 W 5966589.14 N 371498.58 E 0.000 6871.95
10300.00 7925.26 S 86.24 W 5966500.43 N 371497.59 E 0.000 6950.46
10400.00 8013.97 $ 85.70 W 5966411.72 N 371496.61 E 0.000 7028.98
10500.00 8102.69 $ 85.16 W 5966323.00 N 371495.63 E 0.000 7107.49
10600.00 8191.40 $ 84.62 W 5966234.29 N 371494.65 E 0.000 7186.00
10700.00 5851.80 5903.80 8280.12 $ 84.09 W 5966145.58 N 371493.67 E 0.000 7264.51
10800.00 5897.94 5949.94 8368.84 $ 83.55 W 5966056.87 N 371492.69 E 0.000 7343.02
10900.00 5944.09 5996.09 8457.55 $ 83.01 W 5965968.16 N 371491.71 E 0.000 7421.53
11000.00 5990.23 6042.23 8546.27 $ 82.48 W 5965879.44 N 371490.73 E 0.000 7500.05 .~
a 11100.00 6036.37 6088.37 8634.98 S 81.94 W 5965790.73 N 371489.75 E 0.000 7578.56
-----.-
~",J 11200.00 62.521 179.653 6082.52 6134.52 8723.70 S 81.40 W 5965702.02 N 371488.77 E 0.000 7657 .07
-~~"~ 11300.00 62.521 179.653 6128.66 6180.66 8812.42 $ 80.86 W 5965613.31 N 371487.79 E 0.000 7735.58
'''~) 11400.00 62.521 179.653 6174.80 6226.80 8901.13S 80.33 W 5965524.59 N 371486.81 E 0.000 7814.09
,""'.","'*"" 11500.00 62.521 179.653 6220.95 6272.95 8989.85 $ 79.79 W 5965435.88 N 371485.83 E 0.000 7892.60
11600.00 62.521 179.653 6267.09 6319.09 9078.56 $ 79.25 W 5965347.17 N 371484.85 E 0.000 7971.12
~~L~
¡r'a~
2 October, 2002 - 14:44
Page 6 of 10
OdlQuest 3.03.02.003
Sperry-Sun Drilling Services
Proposal Report tor Alpine CD.2 . Plan: CD2-37 - CD2-37 (wpD5)
Your Ref: Horizontal with upward ttaverse . TD
Revised: 2 October, 2003
North Slope, Alaska
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordina
Depth IncL Azlm. Depth Depth Northlngs Eastlngs Northings Comment
(It) (It) (I) (I) (I) (I)
11700.00 62.521 179.653 6313.23 6365.23 9167.28 S 78.72 W 0.000 8049.63
11800.00 62.521 179.653 6359.37 6411.37 9256.00 S 78.18 W 0.000 8128.14
11900.00 62.521 179.653 6405.52 6457.52 9344.71 S 77.64 W 0.000 8206.65
12000.00 62.521 179.653 6451.66 6503.66 9433.43 S 77.10W 0.000 8285.16
12100.00 62.521 179.653 6497.80 6549.80 9522.14 S 76.57 W 0.000 8363.68
.~
12200.00 62.521 179.653 6543.95 6595.95 14.90 N 371478.96 E 0.000 8442.19
12300.00 62.521 179.653 6590.09 6642.09 5964726.18 N 371477.98 E 0.000 8520.70
12400.00 62.521 179.653 6636.23 6688.23 5964637.47 N 371477.00 E 0.000 8599.21
12500.00 62.521 179.653 6682.38 6734.38 5964548.76 N 371476.02 E 0.000 8677.72
12600.00 62.521 179.653 6728.52 6780.52 5964460.05 N 371475.04 E 0.000 8756.23
12700.00 62.521 179.653 73.34 W 5964371.34 N 371474.06 E 0.000 8834.75
12800.00 62.521 179.653 72.81 W 5964282.62 N 371473.08 E 0.000 8913.26
12900.00 62.521 179.653 72.27 W 5964193.91 N 371472.10 E 0.000 8991.77
13000.00 62.521 179.653 71.73 W 5964105.20 N 371471.12 E 0.000 9070.28
13100.00 62.521 179.653 71.20 W 5964016.49 N 371470.14 E 0.000 9148.79
13189.09 62.521 10488.34 S 70.72 W 5963937.45 N 371469.26 E 0.000 9218.74 Begin Dir @ 4.0°/1000 : 13189.09ft
MD, 7052.34ft TVD
13200.00 7057.35 10498.03 S 70.63 W 5963927.76 N 371469.19 E 4.000 9227.33
13300.00 7101.13 10587.83 S 66.73 W 5963837.91 N 371471.55 E 4.000 9308.38
13400.00 7140.87 10679.09 S 57.32 W 5963746.50 N 371479.39 E 4.000 9393.31
13500.00 7176.38 10771.36 S 42.47 W 5963653.99 N 371492.67 E 4.000 9481.71
13600.00 73. 166.160 7155.49 7207.49 10864.20 S 22.22 W 5963560.82 N 371511.32 E 4.000 9573.14
13700.00 75.979 163.145 7182.04 7234.04 10957.15 S 3.3OE 5963467.45 N 371535.25 E 4.000 9667.15
13800.00 78.763 160.202 7203.91 7255.91 11049.76 S 33.99 E 5963374.33 N 371564.35 E 4.000 9763.30 .~
c::::::> 13900.00 81.576 157.315 7220.98 7272.98 11141.57 S 69.69 E 5963281.92 N 371598.48 E 4.000 9861.10
::0 14000.00 84.409 154.470 7233.18 7285.18 11232.14 S 110.23 E 5963190.66 N 371637.46 E 4.000 9960.10
-i¡<~'l.;4I 14091.00 87.000 151.905 7240.00 7292.00 11313.12 S 151.16E 5963109.00 N 371677.00 E 4.000 10050.81 Begin Dir @ 3.00/1ooft : 14091.000
€~
~oJ ~) MD, 7292.ooftTVD
""'"'''''''''- 7" Casing
Target. CD2-37 (HeeL2) - 2592 FSL
1378 FELSEC 14 T11NR4E, 100.00
Radius., Current Target
Q--- 14100.00 87.270 151.905 7240.45 7292.45 11321.05 S 155.39 E 5963101.00 N 371681.10 E 3.000 10059.79
14134.05 88.291 151.905 7241.77 7293.77 11351.06 S 171.42 E 5963070.72 N 371696.60 E 3.000 10093.82 End Dir, Start Sail @ 88.29° :
14134.05ft MD, 7293.77ft TVD
14200.00 88.291 151.905 7243.73 7295.73 11409.22 S 202.46 E 5963012.04 N 371726.65 E 0.000 10159.74
2 October, 2OD2 -14:44 Page6of1D OtllQuest 3.03.D2.(J(3
a
:J:)
-,,,;c-
C'
;:~~: ~ëJ'
~£¡¥c.E7~
rJ--
Alaska North Slope
Measured
Depth
(It)
IncL
AzIm.
14300.00 88.291 151.905
14400.00 88.291 151.905
14500.00 88.291 151.905
14600.00 88.291 151.905
14700.00 88.291 151.905
14800.00 88.291 151.905
14900.00 88.291 151.905
15000.00 88.291 151.905
15100.00 88.291 151.905
15200.00 88.291 151.905
15300.00 88.291 151.905
15400.00 88.291
15500.00 88.291
15600.00 88.291
15700.00 88.291
15800.00 88.291
Sub-Sea
Depth
(It)
7246.72
7249.70
7252.68
7255.66
7258.64
7261.62
Sperry-Sun Drilling Services
Propossl Report for Alpine CD.2 . Plan: CD2-37. CD2-37 (wp05)
Your R.f: Horizontal with upward trav.r.. 0 TO
R.vlsed: 2 October, 2003
Vertical
Depth
(It)
7298.72
7301.70
7304.68
7307.66
7310.64
7313.62
Local Coordinates
Northlngs Easlings
(It) (It)
11497.39 S
15900.00
16000.00
16100.00
16200.00
16300.00
16400.00 88.291 151.905
16500.00 88.291 151.905
16561.76 88.291 151.905
16600.00 89.439 151.905
16618.71 90.000 151.905
2 Octobw', 2002 - 14:44
7264.61
7267.59
7270.57
7273.55
7276.53
7309.33
7312.31
7314.15
7314.91
7315.00
7346.42
7349.40
7352.38
7355.36
7358.35
7361.33
7364.31
7366.15
7366.91
7367.00
12467.35 S
12555.53 S
12643.71 S
12731.88 S
12820.06 S
12908.24 S
12996.42 S
13084.60 S
13172.77 S
13260.95 S
13349.13 S
13437.31 S
13491.77 S
13525.49 S
13542.00 S
249.53 E
296.60 E
343.68 E
390.75 E
82E
9E
767.32 E
814.39 E
861.47 E
908.54 E
955.61 E
1002.68 E
1049.75 E
1096.83 E
1143.90 E
1190.97 E
1238.04 E
1285.11 E
1314.18 E
1332.19 E
1341.00 E
Page 1ot10
Global Coordl
NorthIngs
(ft)
371817.76 E
371863.32 E
371908.87 E
371954.43 E
371999.99 E
5962389.25 N 372045.54 E
596230028 N 372091.10 E
5962211.31 N 372136.65 E
5962122.34 N 37218221 E
5962033.37 N 372227.77 E
5961944.40 N 372273.32 E
5961855.43 N 372318.88 E
5961766.46 N 372364.44 E
5961677.49 N 372409.99 E
5961588.52 N 372455.55 E
5961499.55 N 372501.11 E
5961410.57 N 372546.66 E
5961321.60 N 372592.22 E
5961232.63 N 372637.78 E
5961143.66 N 372683.33 E
5961054.69 N 372728.89 E
5960965.72 N 372774.45 E
5960910.78 N 372802.58 E
5960876.74 N 372820.01 E
5960860.09 N 372828.53 E
Notfh Slope, Alaska
-~~~~ R.->~:f'.~;~=
,: --;ttJ1 OOft)
'1#'
0.000 10259.69
Comment
0.000 10359.65
0.000 10459.60
0.000 10559.56
0.000 10659.51
0.000 10759.47
-~
0.000 10859.43
0.000 10959.38
0.000 11059.34
0.000 11159.29
0.000 11259.25
0.000 11359.20
0.000 11459.16
0.000 11559.11
0.000 11659.07
0.000 11759.03
0.000 11858.98
0.000 11958.94
0.000 12058.89
0.000 12158.85
0.000 12258.80
0.000 12358.76
0.000 12458.71
0.000 12520.45 Begin Dir @ 3.0°/1000 : 16561.76ft
MD,7366.15ftTVD
3.000 12558.68
3.000 12577.39 Continue Dir @ 3.0°/1000: 16618.71f
MD,7367.ooftTVD
Target - CD2-37 (MicL2) - 363 FSL 19
FEL SEC 14 T11NR4E, 100.00
Radius., Current Target
OrllQuest 3.03.02.003
C::>
;::t:J
~.~:-~
Sperry-Sun Drilling Services
PlOposal Repott tor Alpine CD-2 . Plan: CD2-37 . CD2-37 (wp05)
Your Ref: HorlzontalWllh upward tl'tMlrlUl t/¡þ TD
Revlæd: 2 October, 2003
Alaska North Slope
Measured Sub-Sea Vertical Local Coordinates
Depth IncL Azlm. Depth Depth Northlngs Easttngs
(It) (It) (It) (It) (It)
16700.00 92.439 151.905 7313.27 7365.27 13613.69 S 1379.27 E
16800.00 95.439 151.905 7306.40 7358.40 13701.69 S 1426.25 E
16900.00 98.439 151.905 7294.32 7346.32 1378925 S 1472.99 E
17000.00 101.439 151.905 7277.07 7329.07 13876.13 S 1519.37 E
17100.00 104.439 151.905 7254.68 7306.68 13962.10 S 1565.26 E
17200.00 107.439 151.905 7227.22 727922
17300.00 110.439 151.905 7194.77 7246.77
17318.71 111.000 151.905 7188.15 7240.15
Global Coordlna
Northings
(It)
373089.39 E
373132.50 E
373140.47 E
All data is in Feet (US) unless otherwise stated. Directions and
Vertical depths are relative to RKB = 52' MSL Northings
Global Northings and Eastings are relative to NAD27
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from 1934' FNL, 151 d
ta Measured Depth of 17318.71ft.,
Direction of 173.294° (True).
Commen
Measwed
Depth
(It)
Station Coordinates
TVO Northlngs Eastings
(It) (It) (It)
Comment
0.00
200.00
440.00
2530.66
13189.09
0.00
200.00
439.56
2134.22
7052.34
O.ooE
O.ooE
12.55 W
127.97 W
70.72 W
SHL
Begin Dir @ 2.5°/10Oftin 12-1/4H Hole: 2OO.00ft MD, 2OO.OOOTVD
Increase in Dir Rate @ 3.0°/1000: 440.00ft MD, 439.56ftTVD
End Dir, Start Sail @ 62.52°: 2530.66ft MD, 2134.22ftTVD
Begin Dir @ 4.0°/1000: 13189.09ft MD, 7052.34ftTVD
O.OON
O.OON
O.OON
1032.61 S
10488.34 S
2 Octo""" 2Ð02 - 14:44
PageSot10
3.000 12658.65
3.000 12758.41
3.000 12857.66
3.000 12956.15
3.000 13053.60
North Slope, Alaska
Comment
3.000 13149.74
3.000 13244.32
3.000 13261.82 Total Depth: 17318.71ft MD, 7240.15'
TVD
OIflQuest 3.tI3.tJ2.((3
'(J
1"''-''''-''
Alaska North Slope
Sperry-Sun Drilling Services
Proposal Report tor Alpine CD-2 - Plan: CD2-37 - CD2-37 (wpD5)
Your Ref: Horizontal wIIh upward ttaverSfl . TO
ReviNd: 2 Ocfoblw, 2003
Comments (Continued)
Measwed
Depth
(ft)
14091.00
14134.05
16561.76
16618.71
17318.71
Casina details
Station Coordinates
TVD Northlngs Eastlngs
~) ~ ~
Comment
North Slope. Alaska
151.16 E
171.42 E
1314.18 E
1341.00 E
1663.32 E
7292.00
7293.77
7366.15
7367.00
7240.15
11313.12 S
11351.06S
13491.77 S
13542.00S
14145.79 S
From
Measured Vertical
Depth Depth
(ft) (ft,
2 October, 2002 -14:44
Casing Detail
7292.00
2390.00
7H Casing
9 5/8" Casing
Page 9 of 10
--
DdIQuest 3.03.02.003
CD2-37 (Mi<L2) - 363 FSL 190 FEL SEC 14 T11 NR4E
Sperry-Sun Drilling Services
Pmposal Report tor Alpine CN . Plan: C02-37. COM7 (wpOS)
Your Rill: Horizontal with upward tnIVtlrsll 0 TO
Rllvlstld: 2 October, 2003
North Slope, Alaska
Alaska North Slope
Tar.Clets associated with this welloath
CD2-37 (HeeL2) - 2592 FSL 1378 FEL SEC 14 T11 NR4E
M
ordinates
s Eastings Target Target
(ft) (ft) Shape Type
13542.00 S 1341.00 E Circle Current Target
5960860.09 N 372828.53 E ~
70018' 04.8825" N 151001' 48.1981" W
7292.00 11313.12 S 151.16 E Circle Current Target
7240.00 5963109.00 N 371677.00 E
70018' 26.8064" N 151002' 22.8890" W
Target Name
-
""-..,,~
~~~~~:¡16
;4-~::_.,j:::::O"'.~~
.-"
,,",-,~~
~~
2 October, 2DØ2 . 14:44
PIIgtI100f10
DdIQuest 3.03.02.008
Alpine CD-2 Drillf)uest"
CD2-37 WP 5.0 . ~ .
Eastings(1934' FNL, 1519' FEL)
Scale: 1inch = 3000ft
0
,
...... .. ,\/--.., Alaska North 510pe
""RJt.N-".=~ North Slope, Alaska
1500 -
..-...
-'
:n
~
,
C\I
I.()
II 3000-
D
~
1:
'-"
s:::.
..
c.
Q)
:)
ca
0
t
Q)=
> g 6000
~
4500 -
II
.~ s::.
."""""'",,' 0
.~ .5
} ~
.&'"'~.¡;~-~
Q)
) -æ 7500 -
0
en
"""",,...
~
..... ...- . ... ..- -... *--
1365.27
cœ.n (NUJ)- JfJ FSLl" FBLSBC 14 Tl1N1lC
aw~ lfa4j¡ø: IftM/f, f7¡id;_: ""HfI
13Gf.Hn'D.13Ul.IU,IYLItI!
7"Casing
14091.00ftMD
...... .13300.00 7292.00ftTVD
14100 00 17300.00
cm-31(8#/#/U).Jsn FSL 1318 PEL SBC 14 Tlll1lR4E ~~. .14900.00 .15100.00 ..:l~.M ;'/\,>~
Cbrk, 1I64u: 1.o.flJÞ, 71IÏ'*"-: 41.. ~ f..'/n.31 (Mill..)). 363 FSt ,,. FBLSEC U TlINC4ß . ø~
nnøø ~ 11313.11 ~ 151.16 B ank, 1lluiø: IH.- rlrkbm: ..Ift
1367.18 TfA 135n." .\ì.134l,H B
Vertical OrIS'':' :
Horizontal Origin :
Measurement Units :
North Reference :
CD2-37 (WpOS) Proposal Data
RKB = 52' MSL
1934' FNl, 1519' FEl
ft
True North
..,....- -
0
I [)ogleg severity : Degrees per 100 feet (US)
Vertical Section Azimuth: 15f.9OOo
- - - - - - - - Vertical Sect!on ~rlptlon: 1934' FNl, 1519' FEL
Vertical Section OrIgin: 0.00 N.O.OO E
Measured Incl. Azlm. VerUcal
Depth Depth
eastlngs
Dogleg
Rate
t
9518"Casing ~oo
3084.98ftMD
2390.00ftTVD
I
~oo
10.00
f
100
I
t.oo
~ _II. .
ConocóPhl Ips 1-00
VerUcal
Section
0.00
0.00
-5.91
850.62
9218.74
10050.81
10093.82
12520A5
12577.39
13261.82
NorthIngs
,;00.00 0.00 O.<XX> 0.000 0.00
200.00 O.<XX> 0.000 200.00
440.00 6.<XX> 270.000 439.56
2530.66 62.521 179.653 2134.22
13189.09 62.521 179.653 1052.34
1600.00 14091.00 87.f») 151.905 7292.00
14134.05 88.291 151.905 7293.77
16561.76 88.291 151.905 1366.15
16618.71 9O.<XX> 151.905 7367 .00
17318.11 11l.<XX> 151.905 7240.15
0.00£
0.00 Ii
12.55 W
127.97 W
70.72 W
151.16 Ii
171.42 Ii
1314.18 Ii
1341.00£
1663.32 Ii
O.ooN
O.ooN
0.00 N
1032.61 S
104ß8.34 S
11313.12 S
11351.06 S
13491.77 S
13542.00 S
14145.79 S
0.000
2.500
3.000
0.000
4.000
3.000
0.000
3.000
3.000
WeI:
Current Well Properties
Plan: CD2-87
œU7 (8#/d..» .M'! FSt 1378 PBL SEC 14 TllNR4B
ank, RøIIu: 10'.tJÐ/I. Tllklmen: 4D.tlfjt
n,z,H T~ 11313.118,151.16 E
7"Casing
14091.00ftMD
7292.00ftTVD
I 7200.00
HorizonIaI Coorllnatet:
ftU::::..~: ~~~r.~\S7171UOE
ReI. GøoJapIicaI Coordna1e8 : 10° 20' t8.0790' N, t5tO 02' 27.2973" W
RKB EleYation : 52.00It above Mean Sea Level
52.0Oft above Slrucue
North Relerence ;
UIit8 :
True fblh
..... (US)
CD2-37 wp s.o Target Deta
Meøalrer-.l tHe: II
T", eo.dhIIe V8IIiaII D8pIh ...... &ItInp V8ItIaII D8pIh '-=r ~ T8I1JII
..... PoInt Type AIC8 - c:r USI.. MI8n S. L8WI ShIpe
(II) fll (II) (II) (II)
CD'l-37 iMiL2) Edryl'obl 7361.00 13~2.oo S 1341.00 E 731$.00 ~WN 372S2I.S31! Circle
CDl-37 (HoIeU) Bllryl'obl 7Z92.00 11313.12 S 1$1.1611 'J24().OO ~109.00N 371671.00£ Circle
0
- -3000
- -6000
- -9000
-
-'
tl..J
~
0)
T-
I.()
T-
.J
z
LL
~
V
(t)
0)
,...
.......,
UJ
0.
c
=€
80
oz
(I)
II
s::.
0'-'
.5
~
Q)
-æ
0
en
I I
0 1500
Scale: 1 inch = 1500ft
I I I
9000 10500 12000
Vertical Section (1934' FNL. 1519' FEtftion Azimuth: 151.900. (True North)
I
3000
I
4500
I
6000
I
7500
YmLDI!TAIlS
N.... ;Ni-S +8'- W Nœt8IIa I!øIIoI La"'. LooI¡¡I1Ik Sbt
"":CD2-37 -218.20 216.110 591+12105 371719.40 7(!"}fJ18.œ<JN 15runT.'2f1TW NiA
-121
-100
-75
-50
-25
-0 2
-25
-50
-75
-100
-121
.C-~
")
~'~"~...~'...
ANTI-COLLISION !I!'ITlNGS
InlerptÙlÍoo Method:MD Interval: 25.00
Depth R~ From: 36.10 To: 17318.74
MnimmnRaJl&e: 1928.26 Referenœ: PIan:CD2-37 (wpOS)
0
~I.""'.
I
J'J.,,,
Travelling Cylinder AziJœth (lFO+AZI) [deg] vs Centre to Centre Separation [50ft1in]
T
From Colour
0
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
c:oMPANYDl!TAIlS
SURVEY PROGRAM
DoIptt AD Deph To Stavey4>lm
~oo ~~4 =~~=~~
Tool
æ.GYRG-SS
MWl);.JlIR-AK.scc:
~
ClI:ItIIti>tIMdlIocI: ......eum.e
== ~CWhkrNœl1l
w==:: ~,¡ù¡
ToMb
2..'ro
500
750
1000
1250
1500
1750
2000
~o
~50
000
-9tÐ.O
From Colour
0
250
500
750
1000
1250
1500
1750
2000
2250
cr>2~35T.-
;¡P 2750 ---
'J,~.,1)..3000 -
-10.0
-5.0
- Œ7C-
-5.0
-10.0
-15.0
-20.0
,
Travelling Cylinder Azùmth (1F0+AZ1) [deg] vs Centre to Centre Separation [ISf
l'IID:CD2-31 (wpOS) (pþ:CD2-37IP1m:CD.HI)
c:..ated By.BG>ff DtIlO: ~
--cboclizd: Dale:
R~:
To V')
2SO
500
750
WOO
1250
1500
1750
2000
22.c;o
2500
2750
3000
4000
WI!UPAmDI!TAU
PIm: CD2-37
wns:: ~l' sz.mt
V~ ~ = ~
ADP
t5J.!IØ' 0.00 QOO 0.00
LE<iI!ND
....-:<iW"O' crr~ ¡.:J IC"'D: I~,- Map: Ib1t
...... I.D~ l",CD.. I~J. ~ RIll
.=- (1).: t. ,r D.: 1'o1'1I1L Yo,. Ildr.
- CDd-ICÐlI..rIC.MioPlttlllr.
= ~ ~:~ ::"~~-;:;'''~P' ICn
- .:Do: I' ,tl).; I~, Mq. bk
- CD..; ",CD".: 1';, Mp., kG:\.
- 1"1)'.:::' ,ra! ¡:. "". b\
- ro~ ~ ,,-0.. ':i, Mo.. Ibi..
= g~g ~j;.;P~~Ckllaok
= ~i:; ¡æ; ~II~¿\/W.
- C1'I~ 11. .T Ix: s.. YaJ~ lIt.k
- ,-n~ ,).,fTJ.: :liJ'B1.. Mop' Rot-
- ,"1!.- .J',Cl).¡..:d'r, MI,.1Id.
= %~;~ i:,I~b\ MdoJ ktt
- ar~ 1.:.rIt" J:. 1'8,. MI". ...
- ro':~lí[¡~ ':ï Mu..bk
= æ~::~ ::~_~;"b~
ro.- ,. ,CD.' '4., A40Ji Rail.
-- 1"1)..; \I ICl": ~. ...,. R£.k
:::.: *: ~~: ;:'!'I':,~~Ra
- ClY. JII ,.(1]: -,I, fo!orIlIa.i
-~..- f1).; JU ilk 10. MiD Rw.
= :f.~:'~:;::~Ma.c.-
- LD~'" iCD..'~,:I ....... at.,
.-. '1'. 4.; t'ï:U:~j)P.I. Mlø kist
- li'"4.I .CD.".. .Ib..:...........; ""'PI JaoI¡
- Q),.... .1'1.. CI!l4.. 14.;.. lìt.k
-- ~'''II.[¡."'''''llJø"qRr:.l
-. "'rc~.r:n..'.ðIW. ibllol Ru.I
- lD~"" ,'''11:- T. WI;" II..
- (Iu.u...r.I£;..:.';. ~.D.
- .:D"-'" 0\.11.:"'" Mo,.IIb.
-- CD'; 'I.i(])2 "'Ii.~'¡ RId
"="'~ ù'~ ""l.-I!.: "('BI. 'Ia~ ""*
= :t" $.:~::~ ~ ,}I~øl'koM.& b..
- I"'" (m I""""" r Do< 1J111h M.o~ 1tI..
= ~~~~i:~~'\I~.~~" ...~Rid"'
--- I'llA fD.: '11'JI'1a.<11..: '11~1 ('::1'" &II.. Risk
~",,,,,-,o. PIm ~ 'J -MIla.. tL"'..:. 11 pP.1.Cr"""'.J w........ RiIt
- 1'IuI':1r- -I.......... .""!'~.(Jl.L' I, ~".1bJIo
- 11m ."1),." 'I r?Po.... rTC fkDl.'J M.r; IcIIi.
- 111m œ~ ., ,I""" ."1).; IIRIi 0', M..;--. kI!k
- !'liB ru: " ,'Pr> b CI!:; EJW .. ....... ram
- ......:œ '1,....... nr~ÐID '. '101..... lid
- I'Im ':tJ: 'I ,,,,.b CI'..; flU! r-\ !.II" I<s*
--- I'II.ia ft1.: ~11i't"b Ll'.: LB1; 1L Mo..,. ih....
- I'Iw rœ " ¡!'to ... IX'..[k1> ." !ot.n kœ
F1:i!J r'D:'" t .Ç[C..3. .C-R COl~ Nïu.' &tIPiI lUrk
.-.-. I't.h Q.')';"':4.rtt,.' ('\ll üI"" M...... bt
- PIu, I:D.' .. ,....... IL~' ..fA! Ibr.., "''' Risk
......,- !'1m ~""r.... CD.:...~r~:no' !o!....1Iisk
- Ptu.. CD.: " "-U::"'" _. ...
- Pr-Im aJ':."',CD'.:¡'"";. Yar.. RI.k
- ....... <1'~ I: ,m.! Il. M.oJ. ø..~
.-.."q ..,.-u CI>" I-.CD.: I., ...... .."
- ........cr.~.)J.nu':"1'P1, Mo,.1lN.
I'r-IiII CD: b." U': "'.. YoJ~ R..
~:r.a.".:'.. rJ.inL ("I).; ,..ro.: "111 Mnil Ir..
- ~... CD~~.!rm~' Mo.", b~
- .,......mz thl'D.: 06. ..,.RI,t
....... p.o. Lm.4hlCD.: .,s.,IL Ma...., It};
- - ar.: ..I'Ct1.: 'I MIl..... Itt...
- hrlm. CO.: "I.ar " I.. MiIII.oikll..
~ ""'D OJ:" ''; ~CD.l .:.. Ma;':' hi
- A",..Ia:a.CD':"'IIC:r.r.:"., Maøbl
- 1'(.'" ClJZ ".:'I'lI.: .... MIlL MIll kr.l.
= ~== g;i ~:~ ~~ ::t: t::
- Prenc.Dl"''','"'D..:",''..MlpRiJ;
--- PI"'Ji:b Cþ~ "-.,au ",. Pl\n !.Ln Rbk
--- PI~IIII Q\; "./I.C'1I.: 'III Mn- RIoI,
- PIua I.JU 'I:
- cr-..: (; ¡w¡w",¡
..-"J
-'
So<: MD liE Aá
1 3UO 0.00 0.00
Z :nloo 0.00 0.00
3 <MO.oo 6.00 270.00
4 2m7! Q.SZ l19.66
5 13189.19 &.SZ 119.66
6 )@lS5 S1.oo 15190
7 oU34.89 8S.2P lSLlIO
S lti56L18 88.29 I5lllO
9 1Ii618.74 110.00 15LIIO
10 17318.14 111.00 ISl.!IO
Date:
Sø:TIONDIiTAJLS
t\'D +W-S ..6'-W Dú¡ Tl'au
36.10 0.00 0.00 0.000 0.00
:nloo 0.00 0.00 0.000 (loo
43'J.56 0.00 -1255 z.~ 271100
2134.25 -1032.61 .127.911 3.000 -93.46
10S2.3Z -1001').15 .70.77 0.000 0.00
1'l9200 .11314.04 15LZ2 4.000 -52.16
1793.71 .113SL97 rTll;T 3.000 '100
731n15 .134!Il15 1314.22 OJro (100
13õ1.oo .13s.t2oo 134105 3.000 0.14
12!O.15 -14145.75 1E63.43 3.000 0.00
vs.c T.-J:t
0.00
0.00
-5.91
8So.61
92111.43
10051.64 cœ-31 (JfooL2)
lOOIol64 .
l2SZû45
12:>71.41 CD2-37 ("'fŒ)
m6l84
)
Sperry-SuD
Anticollision Report
!iE~:¡lii":';;,;. ;;==:~~;;:~.TMN:::
GLOBAL SCAN APPLIED: AU wellpaths witlûn 200'+ 100/1000 of reference Reference:
Interpolation Method: MO Interval: 50.00 ft Error Model:
Depth Range: 36.10 to 17318.74 ft Sean Method:
Maximum Radius: 1928.26 ft Error Surface:
Survey Program for Definitive WeDpath
Date: 08114/2002 VaDdated: No
Planned From To Survey
ft ft
36.10 1300.00
1300.00 17318.74
Planned: C02-37 (wp05) V11
Planned: C02-37 (wp05) V11
Casing Points
:, .::..,:::;:::.:,)1P;;::.:;':;.;:.;;;i:..~~'::,'..:;~-.;:.::::.~~.~
3085.03 2390.00 9.625
14091.80 7292.00 7.000
ßOIe Size
in
12.250
8.500
NII.Q1e
95/8"
7"
Summary
':;'~G~'Rl~~~~Jr~~d~
Alpine CO2 C02-14 C02-14 V1
Alpine CO2 C02-15 C02-15 V3
Alpine CO2 C02-15 C02.15PB1 V1
Alpine CO2 C02-15 C02-15PB2 V2
Alpine CO2 C02-16 C02-16 (Rig Surveys) V
Alpine CO2 C02-16 C02-16 V7
Alpine CO2 C02-17 C02-17 VO
Alpine CO2 C02-19 C02-19 V7
Alpine CO2 C02-22 C02-22 V1
Alpine CO2 C02-23 C02.23 V2
Alpine CO2 C02-23 C02-23PB1 V12
Alpine CO2 C02-24 C02-24 VO
Alpine CO2 C02-24 C02-24PB1 V1
Alpine CO2 C02-25 C02-25 V1
Alpine CO2 C02-26 C02-26 V4
Alpine CO2 C02-26 C02.26PB1 V2
Alpine CO2 C02.26 C02-26PB2 V3
Alpine CO2 C02-29 C02-29 (Rig Survey) V1
Alpine CO2 C02-29 C02.29 V4 Plan: 002.29
Alpine CO2 C02-32 C02.32 PB1 VO
Alpine CO2 C02-32 C02.32 VO
Alpine CO2 C02-33 C02.33 V2
Alpine CO2 C02.33 C02.33A V1
Alpine CO2 C02-33 C02.34B V1
Alpine CO2 C02-34 C02.34 V3
Alpine CO2 C02-34 C02.34PB1 V2
Alpine CO2 C02-35 C02.35 VO
Alpine CO2 C02-38 C02.38 V5
Alpine CO2 C02.39 C02.39 V1
Alpine CO2 C02-39 C02.39PB1 VO
Alpine CO2 C02-41 C02-41 V9
Alpine CO2 C02-42 C02-42 VO
Alpine CO2 C02-42 C02-42PB1 VO
Alpine CO2 C02-44 C02-44 (Rig Surveys) V
Alpine CO2 C02-44 Plan: C02.44 V13 Plan:
Alpine CO2 C02-45 C02-45 V3 Plan: C02-45
Alpine CO2 C02-46 C02-46 V2
Alpine CO2 C02-47 C02-47 V2
Alpine CO2 C02-48 C02-48 V1
Alpine CO2 C02-49 C02-49 V1
Alpine CO2 CO2-50 CO2-50 V2
Alpine CO2 CO2-50 C02.50PB1 V2
Alpine CO2 Plan: C02-28 Plan: C02.28 PB1 V7 PI
Version: 8
Tooleode
1
Db: Oracle
Principal Plan & PLANNEO PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Tool Name
CB-GYAO.SS Camera based gyro single shot
MWO+IFR.AK-SCC MWO+IFR AK SCC Sperry
Reference
MD
ft
449.67
450.52
450.52
450.52
449.73
449.29
494.75
494.51
495.86
450.29
450.29
449.43
449.43
449.37
250.41
497.80
488.27
448.55
448.66
448.65
448.65
449.39
449.39
449.39
200.09
200.09
412.95
299.37
200.00
199.10
349.14
902.87
902,87
349.16
349.22
298.77
1008.80
13223.51
1061.49
1169,19
1273.17
1273.17
350.32
Oft'~
MD
ft
450.00
450.00
450.00
450.00
450.00
450.00
500,00
500.00
500.00
450.00
450.00
450.00
450.00
450.00
250.00
500.00
490.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
200.00
200.00
400.00
300.00
200.00
200.00
350.00
900.00
900.00
350.00
350.00
300.00
1000.00
14580.00
1050,00
1150.00
1250.00
1250.00
350.00
Ctr.;.Ctr No';'('~
DistaDœ Area
n ft
228.63 7.11
219.40 8.04
219.40 8.04
219.40 8.04
210.06 7,65
210.06 7.53
200.38 7.93
176.46 7.90
147.54 7.66
143.14 7.31
143.14 7.42
128.66 7.30
128.66 7.30
118.82 7.38
109.97 4.40
99.90 7.89
99.30 7.91
81.38 7.41
80.11 8.69
49.70 7.36
49.70 7.36
39.41 7,02
39.41 6.97
39.41 7.02
30.51 4.04
30.51 4.04
19.20 6.58
10.95 5.13
20.28 3.37
20.28 3.35
43.12 6.03
54.74 13,61
54.74 13.61
70.69 6.02
70.82 7.05
79.15 5.13
76.31 14.64
329.04 390.07
112.45 16,33
46.83 18.88
51.54 21.16
51,54 21.16
90.84 6.81
Allowable
Deviation
ft
221.60
211.36
211.36
211.36
202.41
202.52
192.46
168,61
139.93
135.83
135.72
121,37
121.37
111.46
105.57
92.03
91.45
74.02
71.42
42.36
42.36
32,47
32.52
32.47
26.47
26.47
12.68
5.82
16.92
16.92
37.09
41.48
41.48
64.67
63,77
74.05
61.94
44.37
96,28
28.38
30.71
30,71
84.03
- Warning
Pass: Maja Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Maþ Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
Pass: Major Risk
0.:) " r.\"
. ,~I¡l4{H
,/
;Jo¡¡¡:¡
,. .
PhBlipsAraska.lnc.
CaMfIe Aiw,"Unit
Alpine CO2
Plan: C02-37
Plan: OD2-37
)
')
Sperry-SuD
Anticollision Report
Company:
Fjeld: . .
. Rtterenfe Stte: .
Refen- WeD: .
aeferenœ Wellpatb:
Summary
~::.;~57.,..::":~~~;..~.~.:.~";.~.reùr~:.,.;'........t~.~:,::::;~;i~:....'
':f ,',"~,. '.'.I:~I<':.:..~.''':-:~:,~. .r;':".,." r'~.::. '..>..' ',< ~I
Alpine CO2
Alpine CO2
Alpine CO2
Alpine CO2
Alpine CO2
AlpineCD2
Alpine CO2
Alpine CO2
Alpine CO2
Alpine CD2
Alpine CD2
Alpine CO2
Alpine CD2
AlpineCD2
Alpine CO2
Alpine CO2
Alpine CO2
Alpine CD2
AlpineCD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CO2
Alpine CD2
Alpine CO2
Alpine CD2
Alpine CD2
Alpine CO2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CO2
Alpine CO2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Alpine CD2
Plan: C02-28
Plan: C02-13
Plan: CD2-13
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-31
Plan: C02-31
Plan: CD2-31
Plan: CD2-31
Plan: CD2-37
Plan: CD2-43
Plan: CD2-43
Plan: CD2-43
Plan: CD2-43
Plan: CD2-54
PreHm: CD2-QS
Prefim: CD2-12
Prelim: CD2-18
Prelim: CD2-20
PreHm: CD2-20
Prelim: CD2-30
Prelim: CD2-35
Prelim: CD2-36
PreUm: CD2-40
Prelim: CD2-51
Prelim: CD2-51
PreHm: CD2-52
Prelim: CO2-53
Prefim: CD2-55
Prelim: CO2-55
Prelim: CD2-56
PreHm: CD2-57
Prelim: CO2-58
PreHm: CO2-58
Plan: CD2-28 VO Plan:
Plan: CD2-13 PB1 V4 PI
Plan: CD2-13 VO Plan:
PLAN: CD2-31 (GR Horz)
Plan: CD2-31 (ST Core)
Plan: CD2-31 PB1 (Core
Prelim: CD2-ERD 1 VO P
Prelim: CD2-ERD 2 VO P
Prelim: CD2-ERD 3 VO P
Prelim: CD2-ERD 4 VO P
Prelim: CD2-ERD 5 VO P
Prelim: CD2-ERD 6 VO P
Prelim: CD2-ERD 7 VO P
Prelim: CD2-ERD 8 VO P
Plan: CD2-37 PB1 V8 PI
CD2-43 (GR Core Pilot)
CD2-43 (ST Core) V7 PI
Plan: CD2-43 (GR Harz)
Plan: CD2-43 (ST Horz)
CD2-54 VO Plan: A15 (p
CD2-05 V1 Plan: CD2-Q5
CD2-12 V2 Plan: CD2-12
C02-18 VO Plan: CD2-18
CD2-20 PB1 VO Plan: CD
C02-20 VO Plan: CD2-20
CD2-30 VO Plan: CD2-30
CD2-35 VO Plan: CD2-35
CD2-36 VO Plan: CD2-36
CD2-4O VO Plan: CD2-40
CD2-51 PB1 V2 Plan: CD
CD2-51 V3 Plan: CO2-51
CD2-52 VO Plan: CD2-52
CO2-53 VO Plan: CD2-53
CD2-55 PB1 V1 Plan: CD
CO2-55 VO Plan: CD2-55
CD2-56 VO Plan: CD2-56
CD2-57 VO Plan: CD2-57
CO2-58 PB1 VO Plan: CD
CD2-58 VO Plan: CD2-58
Date: 1010312002
.TiJne: 09:26:29
PaJe:
1
Co-ørcUIiate(NE) Reference:
Vertical (TVD) Refenmt"t:
Well: Plan: CD2.37. True.North.
521 MSl. 52.0 .
Db: Oracle
'~~i~.)~'~':'~,:.:;,~:;'f';,..D."
400.38 400.00 90.47 7.02 83.46 Pass: Major Risk
301.20 300.00 240.39 6.00 234.39 Pass: Major Risk
301.20 300.00 240.39 6.11 234.28 Pass: Major Risk
498.86 500.00 57.84 8.85 48.99 Pass: Major Risk
498.86 500.00 57.84 8.96 48.89 Pass: Major Risk
400.30 400.00 60.27 7.82 52.44 Pass: Major Risk
645.04 650.00 45.13 10.84 34.29 Pass: Major Risk
499.01 500.00 56.79 8.87 47.92 Pass: Major Risk
547.55 550.00 55.17 9.50 45.67 Pass: Major Risk
450.49 450.00 61.92 8.35 53.57 Pass: Major Risk
645.01 650.00 46.05 10.86 35.20 Pass: Major Risk
547.53 550.00 56.25 9.53 46.72 Pass: Major Risk
547.58 550.00 54.00 9.47 44.53 Pass: Major Risk
450.50 450.00 60.46 8.39 52.07 Pass: Major Risk ~
36.10 36.10 0.00 0.91 -0.91 FAIL: No Errors /
859.91 850.00 59.10 15.38 44.55 Pass: Major Risk
960.39 950.00 41.71 16.62 26.23 Pass: Major Risk
960.39 950.00 41.71 16.62 26.23 Pass: Major Risk
859.91 850.00 59.10 15.38 44.55 Pass: Major Risk
1103.35 1100.00 22.71 21.30 1.88 Pass: Major Risk
752.01 800.00 310.88 12.56 298.47 Pass: Major Risk
301.31 300.00 250.73 6.09 244.63 Pass: Maþ'Risk
450.89 450.00 189.73 8.57 181.16 Pass: Maþ'Risk
351.17 350.00 170.16 6.96 163.20 Pass: Major Risk
351.17 350.00 170.16 7.07 163.09 Pass: Maþ'Rlsk
691.68 700.00 63.91 11.17 52.82 Pass: Major Risk
399.48 400.00 20.17 7.55 12.63 Pass: Maþ' Risk
349.86 350.00 10.06 6.77 3.30 Pass: Maþ'Rlsk
854.41 850.00 27.27 14.66 13.50 Pass: Major Risk
1121.39 1100.00 140.24 27.58 120.82 Pass: Major Risk
299.19 300.00 140.21 6.11 134.10 Pass: Major Risk
299.14 300.00 150.20 6.11 144.09 Pass: Major Risk
299.09 300.00 160.20 6.11 154.09 Pass: Major Risk
1553.34 1450.00 192.41 31.85 167.91 Pass: Major Risk
1553.34 1450.00 192.41 31.96 167.80 Pass: Maja Risk
298.93 300.00 190.20 6.11 184.09 Pass: Maþ'Risk
298.88 300.00 200.20 6.11 194.10 Pass: Major Risk
298.83 300.00 210.20 6.00 204.20 Pass: Major Risk
298.83 300.00 210.20 6.11 204.09 Pass: Major Risk
Site: Alpine CD2
WeB: CD2-14 Rule Assigned: Major Risk
WeBpatb: CD2-14 V1 Inter-Site Error: 0.00 ft
. ReCerellCe . OII'5et . SemJ...Major AxI$ Qr..Ctr . No.co Allowable
ND TVD MD TVD .Ret. . Offset TFO+t\Z1 n'O-BS CasIng Distance Area Devlathtn .' Wandng
ft ft. ft ft ft ft dég deg In ft. ft ft
36.10 36.10 37.00 37.00 0.00 0.00 353.06 353.06 230.33 0.91 229.42 Pass
49.10 49.10 50.00 50.00 0.01 0.01 353.06 353.06 230.33 1.10 229.23 Pass
99.10 99.10 100.00 100.00 0.07 0.04 353.06 353.06 230.33 1.82 228.51 Pass
149.10 149.10 150.00 150.00 0.18 0.07 353.07 353.07 230.33 2.69 227.63 Pass
199.10 199.10 200.00 200.00 0.30 0.10 353.12 353.12 230.29 3.57 226.73 Pass
249.68 249.68 250.00 250.00 0.36 0.12 353.32 83.32 230.14 4.30 225.84 Pass
300.21 300.18 300.00 300.00 0.43 0.15 353.81 83.81 229.80 5.04 224.79 Pass
350.63 350.52 350.00 350.00 0.49 0.15 354.57 84.57 229.35 5.70 223.70 Pass
400.89 400.63 400.00 399.99 0.54 0.17 355.61 85.61 228.87 6.39 222.56 Pass
449.67 449.18 450.00 449.99 0.61 0.20 357.02 89.79 228.63 7.11 221.60 Pass
493.92 493.18 500.00 499.97 0.62 0.24 358.58 103.91 229.58 7.68 221.96 Pass
538.01 537.01 550.00 549.92 0.60 0.30 0.29 117.10 232.21 8.20 224.03 Pass
581.87 580.56 600.00 599.83 0.57 0.37 2.08 128.67 236.61 8.73 227.89 Pass
625.43 623.74 650.00 649.70 0.57 0.44 3.89 138.46 242.88 9.34 233.54 Pass
)
')
s
.-:¡::
i
~
"i'
i
0
c;;'.)
: .. "'.........J .. :
-: ~.~ .. .-..¡.
~ConocóPhllllps_-:, .
;.;'¡'Œ:¡;;;;:,i:
-9291 -.,... '.-I~--:- ...¡ ....;+'.. ~ ~~.~ " ~ ~
¡ ~ T1), ,!.I j --r- ¡ ~
~ I.' i.- ~'. : ..~ t .. .l ~ .~. :... ..:;. : . " ...1.::.. ;..." j - :. -, :::..: t - -' -'-
-. '1 :... ~~ -.1.. .1..; : . ... .... ¡-. I -. ¡. -- .~.. 'J:~ ... '
-1 0006-='.:~-' --~' -l._:.. ¡ L--~r ~..r~ -.... .1.--. ;. ': .~;~~..- :
~. t ., fod
.~: . -';1 CD2?~C~2-47) 1.- !.. .. -1-- I
~..t~~. 'J- ;-~- ~;îoo~ l'b-
-1072~
. ;. ..l ,1.-'; u ~2.op. ..1.
-':l:- ~l ::l~~r~l
-11435-1- '1-;--;, -.L' ; ~:í ~--~3;~utJ) ~¡~ ;--r .
.. .~ ---1.- --- .~- -- '.1- -- ~- -- ~ ... - :-..: ...1..... " <~ '-~-~ :.. .1--. : --.~ -- ., ~.. ..~. ..; ..
r ' -\- -- :- _...~ .. I. ,'.. ... r _.- .' , '1--'- . -.. ,'. '~it.. .... .; .
-121S~~~j~~ J ?:~1{~'<~*i- ~L;;!~~-~:-
: : i ' ,,: ¡ I! 1320' Radius
'_l: c t ' ::-:--:-t:; :-~u~: ~-' .!-
--I. I~' .. ;.1 .1,. ~--- .~
l~j ~, ~t--n- .:.~. 0-.-
~ ' '.1..; .1. "1--
_-h -- ~ i~' :T'. -! -- .-. ,- _ì "T-:"' -~ . ----':r -- -i ,. r -. ~ ~.L.
-1357~:--:- +-:-7" ~ -+_:-J.. ~:-+- : ~ -,-
I r I ¡ I ; I
.. T ~ .~ - -.r. .1 :. :.1- .~ --,. ~ r
] ., .1 .1.
-t-: ~ ~.. +- - -t :-+
-1- r ~r-.. :1-
I ! I'
+-.~~+~--+
WBlLDBTAILS
N- .¡Nt.s ..BI.W N..ØlÙIt Ba8lin& lAtillJle LoDr;illde Slot
PIaD: 0)2.37 .U8.20 2ó.90 nI4423.05 371719.40 7(I"2O'18.a19N 151'U2'27,297W NlA
-i ..
I ':61@
~'-' ~~: ~~' - J
, -1~1 ~2-4!~~)~::T
: ---1-- : . -~.
¡ 1 ' i
~_..+.~ -~-~-- :
,~::.J ,~
I
- "1 .'~
; I I .....1... j'
_: - -h ~.¿)2:5: i:G~
~...: i ;'1 i.'.~":" .~. ...'
.. ,., ~ ~r -- .,..
~l~-~ ~
i -- i '
--. L. -- :-I:~
.. ¡-- ... 'j
, .1..
_. i
.., ...
-ï"
..,., i. .~" ,'" !,.
_." ~"
.'..-,
- ""~'
- .l..
I
-12864-+-
! ~
.1
:-+ ...;-¡ ~ I
¡ .~...~ -- -~.. .-' -~ ! ".
'1-- :
I Prelim: CD2-36 (CD2-36)
~
=r~ cri2-3'7 (~p05)r1 ~ ~
- ~... -- --,- - -, .','. -- ...",
I '. L :, '
1- ~.'1~-:. '.' -1-- -:.- .,.i.
.. ¡'- " - . ;. : -t I 'j ,.
- ,':..'" <.-1 CD.. 2-37., (wr-S) r .~
---t -¡- ¡-:.. ~ ~ I
¡
.. 'J
-.-..J. -..
f
-_.......-
-14294--r--
-15008~
--+
-
--
-4 ~ .- ,- L.
!
-- J... --:..
-1429
-715
0
715
West( - )Æast(+) [ft]
I
1429
2144
OR:W
... $ ¡
L
.)
')
Phillips Alaska, Inc.
Post OffICe Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
October 9, 2002
1..'4...'.". ..~..
... ,..
. PliWft. ..
..
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill
CD2-37
Dear Sir or Madam:
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from
the Alpine CD2 drilling pad. The intended spud date for this well is October 23, 2002. It
is intended that Doyon Rig 19 drill the well.
/
The well CD2-37 will be drilled to penetrate the Alpine sand horizontally. 7" casing will
then be run and cemented in place. The 6-1/8" horizontal section will be drilled with oil
based mud using mineral oil as the base fluid. I CD2-37 will be completed as an open
hole producer. At the end of the work program the well will be shut in awaiting surface /
connection.
/
Note that it is planned to drill the surface hole without a diverter. There have been 38
wells drilled on CD1 pad and 24 wells drilled on CD2 pad with no significant indication of
gas or shallow gas hydrates.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review.. Pertinent information attached to this application includes the following:
1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program, including a request for approval of annular pumping
operations.
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Proposed completion diagram with open hole isolation options.
7. Pressure information as required by 20 ACC 25.035 (d)(2).
8. Directional drilling I collision avoidance information as required by 20 ACC 25.050
(b).
9. Diagram of riser setup which replaces diverter.
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
RI€EIVED
OCT 11 2002
OR~
Alaska Ot~& Gas Cons. Commission
~\ R Anchorage
f~ L
1=\
)
)
If you have any questions or require further information, please contact Vern Johnson at
265-6081 or Chip Alvord at 265-6120.
~~.
Vern Johnson
Drilling Engineer
Attachments
cc:
CD2-37 Well File I Sharon Allsup Drake
Chip Alvord
Cliff Crabtree
Meg Kremer
Nancy Lambert
Lanston Chin
ATO 1530
A TO 868
A TO 848
A TO 844
Anadarko - Houston
Kuukpik Corporation
e-mail :
Tommy- Thompson@anadarko.com
RE€EIVED
OCT 11 2002
AlasIœ 00& Gas Gons. Commission
Anchorage
~1~~~~~~~--.~-W:".v.,.'PÃo'~'~~-~'~&::~~.~"'~~~~~"'~JC-~~~;õ.i.."._-:'~~~i.;.:.~,,;~,~~~_.,~""~:::.~-~~~,.t~
J S. K. ALLSUP-DRAKE 1005 i
t ræ~~k~~R:~UM COMPANY DATE 10 a'~~~4(J11 I
, ~=~.~~~~.'.~.........f...:.?..r.~.~.'...~.'.,.m.!.I.I.I.1...I.~
¡ . f-/~~I2'i;i,h~~ ],Á: "uOlUBSUJ__- .
1 I~~~
~~"'''''''~~~"Fur-''@~~.. P~I~~~' !Ei)¡ '¡¡¡.. Ufi ~r¡r..«!...iliìMi\.1i¡_~"¡¡¡r'~~r;'~{~¡¡WI_{¡I,~
~
RECE\\J£O
OCi , ¡: 'lOO2
~ Qot\8e~
~O\\.~-
.~'
')
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAMECj:t1 C02--37
PTD# 202 - 2../)
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07110/02
C\j ody\templates
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function. of the original API number stated
above.
In. accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (SO
70/80) from records, data and logs acquired
for well (name on permit). .
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing . exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY //,'//;/~ WELL NAME CR/~ Cð7.--37 PROGRAM: Exp - Dev.2{ Redrll- Re-Enter - Serv - Wellbore seg-
FIELD & POOL I ZO/t'?() INIT CLASS ~~¿, /-ø/J GEOL AREA P~t:'"'J UNIT# r:J.)0.~ (. n ON/OFF SHORE.Q.zU
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . YI N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . ,V N
'Jt2. . /, /. 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
~ /t:y/J¡ ¡jl.- 9. Operator only affected party.. . . . . . . . . . . . .. . . . . Y N
I 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . I::/) N
(Service Well Only) 13. Well located w/in area & strata authorized by injection order #-- Y ~. ,;J,¡CJ.
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. 7' N
ENGINEERING 15. Conductor string provided. . . .. . . . . . . .. . . . . . . ~N
16. Surface casing protects all known USDWs. . . . . . . . . . . rJ:,
17. CMT vol ádequate to circulate on conductor & surf csg. . . . . .. N ~Ô r.. .e.,¿œc.,,{ .
18. CMT. vol adequate to tie-in long string to surf csg. . . . . ., . ~.... A- t) 'Ct.r ~.
19. CMT will cover all known productive horizons. . .. . . . . . . .. N
20. Casing designs adequate for C, T, B & permafrost. ... . . . N 0
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N < ~ I'V- I c¡
22. If a re-drill, has a 10-403 for abandonment been approved. . . '-kN-I\t'/k'
23. Adequate wellbore separation proposed.. . . . . . . . . . . . œ N.
24. If diverter required, does it meet regulations. . . . . . . . . . '¥:-N" Wpvl V~ V-€'ZuLÇtlcÌ,
25. Drilling fluid program schematic & equip list adequate. . . . . Q N ¡/J1fJV,t nt~ o¡. f IF¡'
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . j. N . . ¡.
APPR DATE 27. BOPE press rating appropriate; testto Ç;-OOO psig. . N All S P "2517 fft '
[ I 28. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N
\¡.J4A--¡Oi41() l,... 29. Work will occur without operation shutdown. . . . . . . . . . . N
30. Is presence ofH2S gas probable... . . . . . . . . . . . . . . Ÿ @
31. Mechanical condition of wells within AOR verified. . . . . . . . .¥-N--^'I Æ-
C;ÕN
}f¡o.,1,
(Service Well Only)
GEOLOGY
APPR DATE
~ /~~2--
(Explora~;Y Only)
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . .
36. Contact namelphone for weekly progress reports. . . . . . . .
)
GEOL~ ~
RP~ /
PETROLEUM ENGINEERING:
TEM
RESERVOIR ENGINEERING
JDH - <:FtC
UIC ENGINEER
JBR
COMMISSIONER:
COT
DTS
Comments/Instructions:
Rev: 07/12/02
SFD-
WGA ,./
MJW
M t..-6 /'//0 z..
G:\geology\permits\checklist.doc
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
1ature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
.
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Mar 31 16:56:13 2003
Reel Header
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS writing Library. Scientific
Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
SeJ:~NED MAY O' 9 2007
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-37
501032043400
ConocoPhillips Alaska, Inc.
Sperry Sun
29-MAR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW2217500000
J. MARTIN
D. MICKEY
MWD RUN 5
MW2217500000
M. HANIK
G. WHITLOCK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
11N
4E
1934
1519
MSL 0)
.00
52.50
15.90
c90d -éH I it I S"""1l (0
.
.
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
8.500
6.125
CASING
SIZE (IN)
9.625
7.000
DRILLERS
DEPTH (FT)
3096.0
14162.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1-3 ARE DIRECTIONAL ONLY AND NOT PRESENTED.
4. MWD RUN 4 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) ,
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4), ACOUSTOC CALIPER
(ACAL), AND GEOPILOT.
5. MWD RUN 5 IS DIRECTIONAL WITH DGR, AND EWR4.
6. MWD DATA ARE CONSIDERED PDC PER GKPA GEOSCIENCE
GROUP.
7. MWD RUNS 1-5 REPRESENT WELL CD2-37
API#:50-103-20434-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 17085'MD /
7296'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP
RESISTIVITY) .
RESISTIVITY (EXTRA
RESISTIVITY ( SHALLOW
RESISTIVITY (MEDIUM
RESISTIVITY (DEEP
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves¡ all bit runs merged.
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
.
.5000
START DEPTH
3055.0
3086.0
3086.0
3086.0
3086.0
3086.0
3105.5
.
STOP DEPTH
17018.5
17025.5
17025.5
17025.5
17025.5
17025.5
17085.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
#
REMARKS:
BIT RUN NO
4
5
MERGED MAIN PASS.
$
MERGE TOP
3055.0
14173.0
MERGE BASE
14173.0
17085.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value...................... -999.25
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FPH 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 3055 17085 10070 28061 3055
17085
ROP MWD FPH 0.93 360.49 160.528 27959 3105.5
17085
GR MWD API 28.39 393.3 103.594 27928 3055
.
.
17018.5
RPX MWD OHMM 0.6 71.62 6.48616 27837 3086
17025.5
RPS MWD OHMM 0.1 1715.84 6.72466 27837 3086
17025.5
RPM MWD OHMM 0.14 2000 7.71987 27837 3086
17025.5
RPD MWD OHMM 0.11 2000 9.13785 27837 3086
17025.5
FET MWD HR 0.19 151.22 1.16891 27837 3086
17025.5
First Reading For Entire File......... .3055
Last Reading For Entire File.......... .17085
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPS
RPM
ROP
$
2
header data for each bit run in separate files.
4
.5000
START DEPTH
3055.0
3086.0
3086.0
3086.0
3086.0
3086.0
3105.5
STOP DEPTH
14138.0
14130.0
14130.0
14130.0
14130.0
14130.0
14172.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
18-NOV-02
.
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999.25
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD040
GR MWD040
Units
FT
FPH
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
.
Insite
66.37
Memory
14173.0
58.7
84.5
TOOL NUMBER
155789
136749
8.500
3096.0
LSND
9.60
44.0
8.6
350
6.8
1.900
.891
2.000
1.600
68.0
152.6
68.0
68.0
Offset
o
4
8
Channel
1
2
3
.
.
RPX
RPS
RPM
RPD
FET
MWD040
MWD040
MWD040
MWD040
MWD040
OHMM
OHMM
OHMM
OHMM
HR
4
4
4
4
4
1
1
1
1
1
68
68
68
68
68
12
16
20
24
28
4
5
6
7
8
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 3055 14172.5 8613.75 22236 3055
14172.5
ROP MWD040 FPH 5.43 311.75 173.678 22135 3105.5
14172.5
GR MWD040 API 44.35 393.3 114.325 22167 3055
1413 8
RPX MWD040 OHMM 0.6 18.1 5.41863 22089 3086
1413 0
RPS MWD040 OHMM 0.1 16.39 5.55468 22089 3086
1413 0
RPM MWD040 OHMM 0.32 2000 5.89501 22089 3086
1413 0
RPD MWD040 OHMM 0.11 2000 7.69792 22089 3086
14130
FET MWD040 HR 0.19 151. 22 0.912095 22089 3086
1413 0
First Reading For Entire File......... .3055
Last Reading For Entire File.......... .14172.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
FET
GR
RPX
ROP
$
.
5
.5000
START DEPTH
14114.5
14114.5
14114.5
14114.5
1413 8.5
14152.0
14173.5
STOP DEPTH
17025.5
17025.5
17025.5
17025.5
17018.5
17025.5
17085.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
#
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
.
25-NOV-02
Insite
6.02
Memory
17085.0
86.4
94.1
TOOL NUMBER
129046
130910
6.125
14162.0
Oil Based
8.00
55.0
.0
22500
.0
.000
.000
.000
.000
.0
168.8
.0
.0
. '
.
.
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999.25
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FPH 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
First
Last
Name Service unit Min Max Mean Nsam Reading
Reading
DEPT FT 14114.5 17085 15599.8 5942 14114.5
17085
ROP MWD050 FPH 0.93 360.49 110.547 5824 14173.5
17085
GR MWD050 API 28.39 128.72 62.3034 5761 14138.5
17018.5
RPX MWD050 OHMM 3.55 71.62 10.5886 5748 14152
17025.5
RPS MWD050 OHMM 2.99 1715.84 11.186 5780 14114.5
17025.5
RPM MWD050 OHMM 0.14 2000 18.6081 5780 14114.5
17025.5
RPD MWD050 OHMM 2.01 2000 18.9039 5780 14114.5
17025.5
FET MWD050 HR 0.34 105.99 2.65082 5780 14114.5
17025.5
First Reading For Entire File......... .14114.5
Last Reading For Entire File.......... .17085
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/03/31
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
.
.
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File