Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-234
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marlœr.doc
!¡N'LiNL ~íJ' ~ ç
DATA SUBMITTAL COMPLIANCE REPORT
3/7/2005
Permit to Drill 2022340
Well Name/No. MILNE PT UNIT sa S-19AL 1
Operator BP EXPLORATION (ALASKA) INC
S¡,,-l .2 '1J,,", ~J
API No. 50-029-23121-60-00
MD 11630 V ìVD 4264~' Completion Date 2/1/2003 ~ Completion Status 1-01L
REQUIRED INFORMATION
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD, LWD, GR, RES, ASI, IFR\CASANDRA
Well Log Information:
Log/ Electr
Data Digital Dataset
Tyg.&--· Med/Frmt Number
~- D
Name
Directional Survey
Log Log
Scale Media
Run
No
1
, Rpt
LED' D
_ ~Pt
~pt
LIS Verification
41513 LI~~~n .C0f; I ~w~~ {r1,O"{J
Directional Survey
Directional Survey
véb/ D Directional Survey
I
~D C Pdt r821 LIS Verification
i: C Pdf 11821 I nd uction/Resistivity
C Pdf 11821 I nd u ction/Resistivity
Well Cores/Samples Information:
25
5,6,7
Final
25
Final
Name
Interval
Start Stop
Received
Sent
Current Status 1-01L
UIC N
Directional Survey
n
~J
(data taken from Logs Portion of Master Well Data Maint)
Interval OH/
Start Stop CH Received Comments
7601 11630 Open 3/26/2003 MWD
7658 11575 Case 2/26/2003
7658 11575 ~"n...2/26/2003
7601 11630 Open 3/26/2003
7601 11630 Open 3/26/2003 MWD
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 12/24/2002.
7601 11630 Open 3/26/2003
7658 11630 Open 6/25/2003
7691 11630 Open 6/25/2003 MWD-ROP, DGR, EWR-
MD
7691 4264 Open 6/25/2003 MWD-DGR, EWR - TVD
Sample
Set
Number Comments
---.
.~
DATA SUBMITTAL COMPLIANCE REPORT
3/7/2005
Permit to Drill 2022340
Well Name/No. MILNE PT UNIT SB S-19AL 1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23121-60-00
MD 11630
TVD 4264
Completion Date 2/1/2003
Completion Status 1-01L
Current Status 1-01L
UIC N
ADDITIONAL INFORMATION
Well Cored? Y@)
Chips Received? Y I N
Daily History Received?
0N
GIN
Formation Tops
Analysis 'f-f-t<;(
Received?
Comments:
.~'
---
\'
~
J
Date: )3 jV~ÛJ\ ~ ~
Compliance Reviewed By:
.~
)
WELL LOG TRANSMITTAL
ao~-a3Lf
\i t3~ J
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
June 19, 2003
RE: MWD Formation Evaluation Logs:MPS-19A Ll,
AK-MW-30000800
MPS-19A Ll:
Digital Log Images:
50-029-23084-60
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
A1èl1~t~ð; :~,\k~i9QSl8
~ \\ ,>,,;.., 'IV. (.' '., I~ \;b\ ;:'1,"1::,,' ;'), ",:~,;~
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
.JUN 2 :5 )nn')
c.....·· ,-,..)
( ,.
t"DâÚ~::
Signed:
R~
K~~~~
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
23.
CASING
SIZE
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3308' NSL, 1951 WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
565' NSL, 816' WEL, SEC. 01, T12N, R10E, UM, OATarget2 X = 565172, Y = 6002506 10. Well Number
At total depth
505' NSL, 833' WEL, SEC. 01, T12N, R10E, UM, OA Target 2 X = 565156, Y = 6002446
, 11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff
KBE == 72.2' ADL 380109
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
1-24-2003 ' 1-28-2003 ' 2-1-2003 I
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11630 4264 FT 11630 4264 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD , LWD , GR , RES, ASI , IFR\CASANDRA
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 112' 42"
29' 2637' 9-7/8"
261 7691' 8-1/2"
76811 11582' 6-1/8"
Classification of Service Well
7~'l~~~}
~..:.¿;/.::.:~ ::
",¡~'I'\~"¡¡Ij¡IjIo\~~'t
rt~C'(~,\~~;
!, \f~;.~. l·....t~
" t~: '. .~"';.. . I·:
~ ~.!~, ~.{ '.. ]~~
1'. ,","" .\ ) A:: ,'i""~~ :!II',.'.....::
',,_ ,". 'Iþ L
<,'.,-,.......,~t'."'¡,I'''..:I''\ ."" ,,,/,'.' 'I' ,,,I ,:'.:J
7. Permit Number
202-234 302-365
8. API Number
50- 029-23121-60
9. Unit or Lease Name
X = 565816, Y = 5999975 Milne Point Unit
MPS-19AL 1
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
-T7"µ)~ "'b~ I ' ;nt)
'I2~ ' 7Y.b
20"
9-5/8"
WT. PER FT.
92#
40#
26#
12.6#
GRADE
H-40
L-80
L-80
L-80
CEMENTING RECORD
260 sx Arctic Set (Approx.)
786 sx Class 'L" 225 sx Class 'G'
75 sx Class IE', 273 sx Class 'GI
Uncemented Slotted Liner
AMOUNT PUllED
7"
4-1/2"
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
SIZE
4-1/2", 12.6#, L-80
TUBING RECORD
DEPTH SET (MD)
76501
PACKER SET (MD)
7597'
25.
MD
TVD
MD
TVD
8076' - 11539' 4339' - 4279'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1802' Freeze Protected with 62 Bbls of Diesel.
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
March 3, 2003 Flowing
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl
3/4/2003 6 TEST PERIOD 2465 542 0
Flow Tubing Casing Pressure CALCULATED Oll-BBl GAs-McF WATER-BBl
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core Chrps. -.
l_
CHOKE SIZE
GAS-Oil RATIO
220
Oil GRAVITY-API (CORR)
No core samples were taken.
Mt p 0 (I "
"'I t:, .J '.
..t,.
.-,
.... .t.."-'......:··.....
:'¡f!
~ . r !.:
(,r
Submit In Duplicate
Form 10-407 Rev. 07-01-80 1180 M S B F l
ODI('!~,IAf
i \ lJ Ii\! "~ t._
APR 2
)
29.
Marker Name
Geologic Markers
Measured
Depth
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
SBF2-NA
7478'
4222'
SBF1-NB
7543'
4245'
SBE4-NC
7607'
4268'
SBE2-NE
7634'
4278'
SBE1-NF
7777'
4323'
Top of Schrader 'OA'
8092'
4340'
TSBC
10936'
4333'
TSBC
11072'
4328'
Top of Schrader lOA'
11567'
4274'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed SOndr(~~~Ó)~~.~')....r--.-I!!le Technical Assistant Date 03 - I g: -(':)6
MPS-19AL 1 202-234 302-365 Prepared By Name/Number: Sandra Stewman, 564-4750
Well Number Permit NO.1 Approval No. Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
)
)
BP Page 1 of6
. ..
Oper~tlon$> $ummaryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Date
From "'Tö Höurs Task. Code NPT . Phasë
1/17/2003
00:00 - 03:00 3.00 MOB P
03:00 - 04:30 1.50 MOB P
04:30 - 08:00 3.50 MOB P
08:00 - 09:30 1.50 MOB P
09:30 - 12:00 2.50 MOB P
12:00 - 18:00 6.00 MOB P
18:00 - 19:00 1.00 BOPSUR P
19:00 - 21 :00 2.00 BOPSUR P
21 :00 - 22:00 1.00 BOPSURP
22:00 - 00:00 2.00 BOPSURP
1/18/2003 00:00 - 03:00 3.00 BOPSUR P
03:00 - 03:30 0.50 BOPSUR P
03:30 - 05:30 2.00 CLEAN P
05:30 - 06:30 1.00 CLEAN P
06:30 - 09:00 2.50 CLEAN P
09:00 - 10:00 1.00 CLEAN P
10:00 - 11 :30 1.50 CLEAN P
11 :30 - 19:00 7.50 CLEAN P
19:00 - 21 :00 2.00 CLEAN P
21 :00 - 21 :30 0.50 CLEAN P
21 :30 - 23:00 1.50 CLEAN P
23:00 - 00:00 1.00 CLEAN P
1/19/2003 00:00 - 01 :00 1.00 CLEAN P
01 :00 - 04:00 3.00 EVAL P
04:00 - 06:30 2.50 DRILL P
06:30 - 08:30 2.00 DRILL P
08:30 - 11 :00 2.50 DRILL P
11 :00 - 11 :30 0.50 DRILL P
11 :30 - 15:00 3.50 DRILL P
15:00 -16:30 1.50 DRILL P
16:30 - 17:00 0.50 DRILL P
17:00 - 17:30 0.50 DRILL P
17:30 - 19:30 2.00 DRILL P
19:30 - 20:30 1.00 DRILL P
20:30 - 22:30 2.00 DRILL P
22:30 - 00:00 1.50 DRILL P
1/20/2003 00:00 - 01 :00 1.00 DRILL P
01 :00 - 02:00 1.00 DRILL P
PRE
PRE
PRE
PRE
PRE
PRE
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Description of Operations
Rig Modification, fit auger chutes, patch hole in wall from cut off
conveyor.
Skid rig floor over sub
Prepare rig to move over well
Moving rig over MPS-19a
Spot rig washer, rig up
Skid rig floor, rig up floor and fill pipe shed with drill pipe, PJSM
on nipple down and nipple bops
Nipple down tree,remove false hanger, fill rock washer with
water, checking for leaks
Nipple up 13 3/8 Bop stack, change lower rams to 3.5 X6
bops have 2 7/8 x 5 in top rams, blinds in middle, 3.5 x6 in
lower rams
Install test plug, rig up for test, PJSM on bop testing
Test bops and hydrill 200psi low 4,000 high on bops, hydrill200
low 2,500 high, fixed to leaks on bottom flange and kill line
Bop test was witness by Iou Grimaldi with AOGCC
Test bops and hydrill 200psi low 4,000 high on bops, hydrill 200
low 2,500 high, fixed to leaks on bottom flange and kill line
Bop test was witness by Iou Grimaldi with AOGCC
Install wear ring, lay down test jt,
Pick up Hughes ATJ-11 6.125 bit and bit sub, 3.515.5 S-135
pipe. to 2,000 ft.
Displace diesel out of well, with water
Pick up 3.515.50 S135 drill pipe total 189 jts
Cut drilling line, service top drive
Tripping out wI 3.5 15.50 pipe, standing in derrick
P/U bit AT J-11, MWD/GR 12 dc, 15 hw. Picking up 3.5 13#
S-135 pipe 144 jts
Tripping in with 3.5 out of derrick
Break circ wash to float collar, Tag up on float collar@ 8038,
set down 30,000# wt
Ready pits, and rock washer, take fluid out of pit #1
Displace well bore with 9.2 flow-pro with 250 gals min. 1800 psi
P/U 127,000 S/O 95,000 RIT 110,000 50 rpm TQ 5,000
Test csg to 3,500 psi for 30 min
MAD pass from 7980 to 7500 for tie end, top of O-A 7812
POH for whip stock. lay down MWD
Pick up 3.5 space out jts., whipstock, mills,mwd,orient
RIH with whipstock
Orient to 10 degrees to the left and set whipstock
Mill window From 7812 to 7824, Drll to 7835
Circ two bottoms up, with 280 gals min 2080 psi
FIT test with 440 psi, 9.1 mud wt 4341 tvd= 11.0 EMW
Flow check and rig down test eqipment, pump slug
Trip out to bha
Stand back Bha, lay down mills
Pick up Bha #2 Fm2643 wI 3x12,4 3/4 sperry drill motor 1.50
bend,float sub,4 3/4 GRlRES, 4 3/4 OM, hang off sub,3 flex
dc,jars
RIH fill pipe every 25 sds.
Tripping in to 7769
Service top drive, cut drill line
~
I. ¡C¡A
Printed: 2/3/2003 12:33:46 PM
') )
l
SF' Page 2 of6
Operations. Summary. Report
Legal Well Name: MPS-19
Common Well Name: MPS-19 Spud Date: 10/18/2002
Event Name: DRILL +COMPLETE Start: 1/17/2003 End: 2/1/2003
Contractor Name: DOYON DRILLING INC. Rig Release: 2/1/2003
Rig Name: DOYON 14 Rig Number:
Date From ~ To Hours Task· Code NPT Phase Descri ptibn· of Operations
1/20/2003 02:00 - 02:30 0.50 DRILL P PROD1 Orient motor slide thru window 7812 to 7824
02:30 - 23:00 20.50 DRILL P PROD1 Directional Drill 7835 to 10143 with 250 gals min. 2850 psi 80
rpms 5-10K bit wt., Went out the bottom of O-A sand @ 9970
TVD 4,228 @ 87 degrees, drilled to 10143 to make sure.
AST 4.0 ART 9 on bottom tq 4,000 off bottom 3.500 P/U
115,000 S/O 81,000 R/T 98,000
23:00 - 00:00 1.00 DRILL P PROD1 Circ bottoms up, for open hole side track @ 9,174
1/21/2003 00:00 - 01 :00 1.00 STKOH N DPRB PROD1 Pump out of Hole from 10,143' to 9,164' to proceed wI Open
Hole Sidetrack.
01 :00 - 15:00 14.00 STKOH N DPRB PROD1 Sidetrack by Time Drilling from 9174' to 9198'. Continue
Directional Drilling from 9198' to 10,200'. Geologist determined "
that we Side Tracked out of Target Sand @ 9965'.
Drilled wI 250 GPM @ 3040 psi., TQ = 4.5K
PUW = 11 OK, SOW = 77K, ROTW = 95K.
AST = 5 Hrs. ART = 5.25 Hrs.
15:00 - 15:30 0.50 STKOH N DPRB PROD1 CBU w/ 250 GPM @ 2900 psi.
15:30 - 16:00 0.50 STKOH N DPRB PROD1 POH to 9630' in preparation for OH Sidetrack.
16:00 - 16:30 0.50 STKOH N DPRB PROD1 RIH to 10,090'.
16:30 - 19:00 2.50 STKOH P PROD1 Circulate 3 Bottoms up wI 280 GPM @ 3080 psi.
19:00 - 21 :00 2.00 STKOH P PROD1 Pump out of Hole from 10,090' to 7870' - No Drag - Hole in
good condition. POH, w/o Pumps from 7870' to 7760'. No
Problems with Window.
21 :00 - 21 :30 0.50 STKOH P PROD1 Flow Check Well - Pump Slug.
21 :30 - 23:30 2.00 STKOH P PROD1 POH from 7760' to BHA.
23:30 - 00:00 0.50 STKOH P PROD1 Flow Check - Flush BHA wI 5 Bbls. water.
1/22/2003 00:00 - 01 :00 1.00 STKOH P PROD1 LID BHA #2
01 :00 - 01 :30 0.50 CASE P COMP PJSM with all Hands, R/U to Run Liner
01 :30 - 03:00 1.50 CASE P COMP Run 4.5" Liner. Total 52 Slotted Jts + 1 Solid Jt.. M/U
Hanger/Packer Assy.
03:00 - 05:30 2.50 CASE P COMP RIH wI Liner on 3.5" DP to 9970' - Top of Liner @ 7762'.
Pick Up Wt = 123K, Slack Off Wt = 90K
05:30 - 07:00 1.50 CASE P COMP Drop Setting Ball & Pump Down. Pressure to 2500 psi to set
Baker "HMC' Liner Hanger. Verify Set with 20K Down Weight.
Shear ball seat w/ 3700 psi. Rotate setting tool off Packer and
attempt to set 15K down weight on "ZXP" Packer to confirm
Set. - Liner Assembly moving down Hole. Keep moving down
1 0 ft to 9980' ( TOL @ 7772'). Only 5K down moves Liner.
Slips not Set.
07:00 - 11 :30 4.50 CASE P COMP POH - SLM, No Correction
11 :30 - 12:00 0.50 CASE P COMP LID Running Tool - Looks OK.
12:00 - 12:30 0.50 CASE P COMP Lubricate Rig.
12:30 - 13:00 0.50 CASE N DFAL COMP M/U Liner Stacker/Packer Assy. w/6' Tie Back Sleeve & 10'
Pup Jt w/ WLEG on bottom.
13:00 - 14:30 1.50 CASE N DFAL COMP RIH w/ Hanger Assy on 3.5" DP. Set down 20K @ 2056'. P/U
Free. Set down again and pulled up Free. Notify Co. Rep.
Co.Rep had driller set down w/10K. - Same spot. P/U 30K
Over string wt. - Stuck.
14:30 - 18:00 3.50 CASE N DFAL COMP Evaluate situation and alternatives with BP & Baker, Mgmt,
Engineers and Operations personnel.
18:00 - 19:30 1.50 CASE N DFAL COMP Pull on Packer Assy. wI 130K Max ( at Tool). Work several
times. No Success. Drop Ball and complete setting Process.
19:30 - 20:30 1.00 CASE N DFAL COMP POH LID Running tool. OK. No Anomalies
Printed: 2/3/2003 12:33:46 PM
) )
BP P~e3~6
Operë:ttionsSumm.ary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date From - To Hours Task Code NPT Phase Description of Operations
1/22/2003 20:30 - 21 :30 1.00 FISH N DFAL COMP P/U Baker Milling Tools to Rig Floor. PJSM WI all hands.
21 :30 - 23:00 1.50 FISH N DFAL COMP M/U Milling BHA & RIH to 2038' Tag TOL.
23:00 - 00:00 1.00 FISH N DFAL COMP Mill Tie Back receptacle from 2038' to 2045'. Pump @ 230
GPM & 520 psi. RPM = 80 to 100, 20K to 25K Weight on Mill.
1/23/2003 00:00 - 03:00 3.00 FISH N DFAL COMP Mill Packer from 2045' to 2055' Pump 230 GPM @ 530 psi.
Rotate 80 to 100 RPM. 20K to 25K Weight on Mill. Packer
Free. Push downhole to 2191'
03:00 - 03:30 0.50 FISH N DFAL COMP Circulate Hole Clean - 420 GPM @ 1050 psi.
03:30 - 04:30 1.00 FISH N DFAL COMP POH. UD Mill & Junk Baskets.
04:30 - 05:30 1.00 FISH N DFAL COMP Flush Stack. M/U Spear Assy.
05:30 - 07:30 2.00 FISH N DFAL COMP RIH wI Spear. Tag up on Fish @ 2191'. Continue RIH to 4106'
Taking no weight to push Fish Downhole.
07:30 - 09:00 1.50 FISH N DFAL COMP POH - No Fish on Spear.
09:00 - 11 :30 2.50 FISH N DFAL COMP RIH Push Fish to Lower Packer @ 7772'.
11 :30 - 12:00 0.50 FISH N DFAL COMP Engage Fish w/ Spear stacking 30K Lbs on Packer.
Pick up Wt = 119K, Slack off Wt = 95K
12:00 - 12:30 0.50 FISH N DFAL COMP PJSM on POH wI Fish. Pump Slug.
12:30 - 23:30 11.00 FISH N DFAL COMP POH w/ Fish. Fish catching on all Casing couplings. Having to
work through pumping out & wI left hand rotation to 5800'.
Pulled dry w/ no hang-ups from 5000' to surface.
NO Fish on Spear. Grapple in release position wI dulled
blades.
23:30 - 00:00 0.50 FISH P COMP Service I Lubricate Top Drive
1/24/2003 00:00 - 02:00 2.00 FISH N DFAL COMP P/U & M/U Packer Mill BHA.
02:00 - 05:00 3.00 FISH N DFAL COMP RIH - Tag Fish @ 4840'. Push Fish to Bottom. TOF @ 7767'.
05:00 - 06:00 1.00 FISH N DFAL COMP Circulate Hole Clean 3 X Bottoms Up - 400 GPM & 120 RPM.
06:00 - 06:30 0.50 FISH N DFAL COMP POH to 5800'
06:30 - 07:30 1.00 FISH P COMP Slip & Cut Drilling Line, Service Top Drive.
07:30 - 09:00 1.50 FISH N DFAL COMP POH to BHA
09:00 - 09:30 0.50 FISH N DFAL COMP Empty Junk Baskets Recovered 8 very small pieces of junk
out of two boot baskets - negligible recovery. UD Baker Mill &
Tools.
09:30 - 12:30 3.00 STWHIP P PROD2 P/U & M/U Retrievable, 5.5", Whipstock BHA, Orient, Up Load
MWD, Shallow Test.
12:30 - 18:00 5.50 STWHIP P PROD2 RIH wI Whipstock to 7636'
18:00 - 18:30 0.50 STWHIP P PROD2 Break circulation. Orient Tool Face 7 Deg. Left of High Side.
P/U Wt. = 118K S/O Wt. = 93K.
18:30 - 19:00 0.50 STWHIP P PROD2 RIH Tag TOF @ 7767'. Set 18K Down to set Anchor, Increase
to 20K. P/U 5K over to confirm - OK. Set 35K down to shear
release bolt.
19:00 - 00:00 5.00 STWHIP P PROD2 Mill Window from 7691' to 7703'. Drill to 7714' to ensure String ,¡f(-
Mills through window. Milling wI 250 GPM @ 1600 psi. c'" ~
60 to 120 RPM, 2K to 9K Wt. on Mill. Torque = 4K to 8K. ..xu (
Worked through Window without pump - OK j,6~
1/25/2003 00:00 - 01 :30 1.50 STWHIP P PROD2 Circulate Wellbore Clean 3 X btms up - @ 280 GPM - 1800 psi.
01 :30 - 03:30 2.00 STWHIP P PROD2 POH. Stand Back HWDP & DC's.
03:30 - 04:00 0.50 STWHIP P PROD2 UD Window Milling BHA.
04:00 - 04:30 0.50 STWHIP P PROD2 Function rams & Flush BOP.
04:30 - 05:00 0.50 STWHIP P PROD2 RIU to Test BOPE. Pull Wear Bushing. Run Test Plug.
05:00 - 09:00 4.00 STWHIP P PROD2 Test BOPE to 250 psi. Low I 4000 psi. High. Annular to 250
Low 12500 High. Upper tBOP Valve on Top Drive & Valve # 12
Printed: 2/3/2003 12:33:46 PM
) )
8 P Page 4 of 6
Operations Summary RepC?rt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date From-To Hours Task Code NPT Phase Description of Operations
1/25/2003 05:00 - 09:00 4.00 STWHIP P PROD2 on Choke Manifold Failed.
09:00 - 15:30 6.50 STWHIP N RREP PROD2 Replace IBOP on Top Drive & Repair Valve # 12 on Choke
Manifold. Retest both to 250 / 4000 psi. - OK. Witness of BOP
Test waived by John Spaulding, AOGCC.
15:30 - 16:30 1.00 STWHIP P PROD2 M/U Kick Off BHA, RIH to 230' & surface Test MWD - OK.
16:30 - 20:00 3.50 STWHIP P PROD2 RIH to 7615' , picking up 39 jts 3.5" Doyon Rental DP & Filling
pipe every 25 stands.
20:00 - 20:30 0.50 DRILL P PROD2 Orient Motor to 7 deg. L of HIS, turn off pumps and slide
through window @ 7691' -7703'. Wash to 7714.
20:30 - 00:00 3.50 DRILL P PROD2 Orient & Directional Drill from 7714' to 7880'.250 GPM @ 2460
psi. Torque = 5K RPM = 40 P/U = 11 OK, S/O = 85K, ROT =
100K. AST = 2.15 Hrs. ART = .08 Hrs.
1/26/2003 00:00 - 11 :30 11.50 DRILL P PROD2 Directional drill 6 1/8" Hole from 7880' to 8731'.
250 GPM @ 2600 psi. TO = 5K RPM = 30 to 40
P/U = 11 OK, S/O = 80K, ROT = 100K
AST = 6.25 Hrs. ART = 1.25 Hrs.
Majority of build & turn made - Pull out for 1.5 Deg. Motor.
11 :30 - 12:30 1.00 DRILL P PROD2 Circulate 2 X Btms Up @ 250 GPM - 2400 psi & 30 RPM.
12:30 - 13:30 1.00 DRILL P PROD2 Pump out of Hole to 7800'. Turn off pumps & pull above
window.
13:30 - 14:00 0.50 DRILL P PROD2 Flow Check - OK. Pump Slug.
14:00 - 16:30 2.50 DRILL P PROD2 POH wI DP.
16:30 - 17:00 0.50 DRILL P PROD2 Stand Back BHA. Adjust Motor from 1.83 Deg. to 1.5 Deg.
17:00 - 17:30 0.50 DRILL P PROD2 Down Load then Up Load MWD/LWD.
17:30 - 18:00 0.50 DRILL P PROD2 M/U & RIH w/ BHA to 300'. Test MWD - OK.
18:00 - 20:30 2.50 DRILL P PROD2 RIH to 7600', filling pipe every 25 stands.
20:30 - 21 :30 1.00 DRILL P PROD2 Slip & Cut Drilling Line, Service Top Drive.
21 :30 - 22:00 0.50 DRILL P PROD2 Orient Motor to High Side, Slide through Window an on to
8670'. Wash last stand to bottom @ 8731',
22:00 - 00:00 2.00 DRILL P PROD2 Directional drill 6 1/8" Hole from 8731' to 8870'
255 GPM @ 2660 psi. TO = 5K, RPM = 80
P/U = 113K, S/O = 85K, ROT = 100K
AST = 0.62 Hrs. ART = 0.25 Hrs.
1/27/2003 00:00 - 00:00 24.00 DRILL P PROD2 Directional Drill from 8,870' to 10,309'. 255 GPM @ 2760 psi.
P/U = 120K, S/O = 75K, ROT = 105K RPM = 80 TO = 5K
AST = 7.75 Hrs, ART = 7.25 Hrs.
Sliding Difficult. Keeping toolface hampered by severe dog legs
and exposed shale. Inceased lubricants from 2% to 3% to aid
in sliding.
1/28/2003 00:00 - 16:00 16.00 DRILL P PROD2 Directional Drill from 10,309' to 11,630'. 255 GPM @ 3160 psi.
TO on Btm = 8K ROT @ 80 RPM Drilling - 100 RPM Reaming.
P/U = 125K, SIO = 60K, ROT = 105K
AST = 2.25 Hrs. ART = 7 Hrs.
Topped Out in OA Sands @ 11,567' per Geologist.
Drilled Total 3100' Pay in OA Interval.
16:00 -18:00 2.00 CASE P COMP Circulate 3 X Bottoms Up. 100 RPM, 280 GPM @ 3500 psi.
18:00 - 22:30 4.50 CASE P COMP Pump out of Hole from 11,630' to 7,802' with no problems nor
excess drag. Turned off pumps and pulled dry - pulled 35K to
50K over from 7770' to 7740'. Go back down to 7770' and
pump out to 7720'. Turn off pumps and pull through Window at
7703' to 7691' up to 7630' with no problem.
Printed: 2/3/2003 12:33:46 PM
)
")
BP
Operéltions Summary Report
Page 50f6
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date From - To Hours Task, Code NPT Phase Description of Operations
1/28/2003 22:30 - 23:00 0.50 CASE P CaMP Observe Wellbore - Static. Pump Dry Job.
23:00 - 00:00 1.00 CASE P CaMP POH wi DP.
1/29/2003 00:00 - 02:00 2.00 CASE P CaMP POH wi 3.5" DP
02:00 - 02:30 0.50 CASE P CaMP LID NIM Flex Collars, Motor & MWD.
02:30 - 03:00 0.50 CASE P CaMP P/U & M/U 61/8" Porcupine Hole Opener Assy.
03:00 - 05:30 2.50 CASE P CaMP RIH, filling pipe every 25 stands to 7680'.
05:30 - 07:00 1.50 CASE P CaMP Slip & Cut Drilling line. Service Top Drive.
07:00 - 10:00 3.00 CASE P CaMP Ream from 7714' to end of severe turn & dog leg interval @
8962'. Ream @ 255 GPM & 100 RPM.
10:00 - 11 :00 1.00 CASE P CaMP RIH to 11563' - No Obstructions. Wash & ream to bottom @
11630' .
11 :00 - 13:30 2.50 CASE P CaMP Circulate 3 X Bottoms up - Wellbore clean. 265 GPM
Reciprocating @ 100 RPM.
13:30 - 17:30 4.00 CASE P CaMP Pump out of Hole from 11,630' to 7720'. pulled 25K over from
7780' to 7750'. Ream down & pull back up - No Drag.
17:30 - 18:30 1.00 CASE P CaMP Pull above Window & CBU @ 275 GPM & 120 RPM. Pump Dry
Job.
18:30 - 21 :00 2.50 CASE P CaMP POH w/ DP.
21 :00 - 22:00 1.00 CASE P CaMP Break out & Lay Down Hole Opener BHA
22:00 - 23:30 1.50 CASE P CaMP P/U & MU Whipstock Retrieval Tool Assy.BHA. Upload & orient
MWD.
23:30 - 00:00 0.50 CASE P CaMP RIH wi Drill Collars from Derrick.
1/30/2003 00:00 - 00:30 0.50 CASE P CaMP Complete RIH wi BHA. Pump and test MWD - OK
00:30 - 03:00 2.50 CASE P CaMP RIH to 7658'
03:00 - 03:30 0.50 CASE P CaMP Orient Tool & Latch into Whipstock @ 7696'. Pull free with 75K
Over
03:30 - 06:00 2.50 CASE P CaMP POH wi Whipstock. Found thin concave disk of steel between
the Retrieving tool & the Whipstock.
06:00 - 07:30 1.50 CASE P CaMP LID W/S retrieval assy. Clear & Clean floor.
07:30 - 08:00 0.50 CASE P CaMP R/U to run Liner.
08:00 - 08:30 0.50 CASE P CaMP PJSM with all Hands.
08:30 - 12:30 4.00 CASE P CaMP Run 4.5", 12.6#, L-80, IBT-m Slotted Liner as per Program
12:30 - 13:00 0.50 CASE P CaMP M/U Hook Hanger Assembly.
13:00 - 17:00 4.00 CASE P CaMP RIH w/4.5" Liner on 3.5" DP. Work Liner through Window - no
problems. Continue running until Hanger just above window @
7691'.
17:00 - 20:00 3.00 CASE P CaMP Attempt to latch Hook in window, utilizing swivel to turn Hook
Assy. finally turned complete string and were able to Latch.
Worked three times - latched same place every time. TaL
inside of casing @ 7681'.
20:00 - 21 :00 1.00 CASE P CaMP Drop Ball & pressure up to 2900 psi to release from Hanger.
P/U to verify. Pressure up to 4000 psi to shear ball into catcher
sub.
21 :00 - 23:00 2.00 CASE P CaMP POH w/ Running Tool.
23:00 - 23:30 0.50 CASE P CaMP LID running tool, M/U Gauge I Junk Mill BHA.
23:30 - 00:00 0.50 CASE P CaMP RIH
1/31/2003 00:00 - 01 :30 1.50 CASE P CaMP RIH w/ Gauge I Mill Assy. to 7623'.
01 :30 - 02:30 1.00 CASE P CaMP Slip & Cut Drilling Line. Service Top Drive
02:30 - 05:00 2.50 CASE P CaMP Displace Mud w/265 Bbls. 8.8 ppg. brine, then 30 Bbl. Hi-Vis
Sweep, 150 Bbls. 8.8 ppg. Brine followed by 445 BBls. 9.2 ppg.
NaCI. Pumped @ 350 GPM, Reciprocating @ 120 RPM
05:00 - 14:00 9.00 CASE P CaMP POH LID all DP. RIH w/ DP in Derrick, POH LID.
Printed: 2/3/2003 12:33:46 PM
)
)
BP Page 6 of 6
OpE!rations.summary··Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Date From - To Hours Task Code . NPT Phase
1/31/2003 14:00 - 16:00 2.00 RUNCOIVP CaMP
16:00 - 16:30 0.50 RUNCOIVP CaMP
16:30 - 00:00 7.50 RUNCOIVP CaMP
2/1/2003 00:00 - 03:00 3.00 RUNCOIVP CaMP
03:00 - 06:00 3.00 RUNCOIVP CaMP
06:00 - 07:30 1.50 CHEM P CaMP
07:30 - 09:30 2.00 RUNCOIVP CaMP
09:30 - 10:30 1.00 WHSUR P CaMP
10:30 - 11 :30 1.00 RIGD P CaMP
11 :30 - 12:00 0.50 WHSUR P CaMP
12:00 - 13:30 1.50 WHSUR P CaMP
13:30 - 14:30 1.00 WHSUR P CaMP
14:30 - 15:30 1.00 WHSUR P CaMP
15:30 - 18:00 2.50 WHSUR P CaMP
18:00 - 19:00
19:00 - 20:00
1.00 WHSUR P
1.00 RIGD P
CaMP
CaMP
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Descri ption of Operations
Pull Wear Ring. R/U to Run 4.5" Completion.
PJSM with Crew & all Service Co. personnel.
Run 4.5" Completion String as per program. Make up 5 Lower
Tool Assemblies. Hook up I - Wire to Phoenix sensor. Run 6
Jts. and gather all hands at Drillers console - Every one
comfortable with operation - Proceed.
RIH w/4.5" Completion Tubing. Total - 184 Jts. + Tools.
M/U Tubing Hanger and Orient. M/U Landing Jt. Insert I-Wire &
Penetrator into Tubing Head. Test line integrity - OK. Land
Tubing Hanger. R.I.L.D.S. WLEG @ 7650'.
Reverse Circulate corrosion inhibited, 9.2 ppg. Brine spotting in
annulus between GLM & Packer.
Drop Ball-Rod. Check seat wI 500 psi. Pressure up to 2500 to
set Packer then increase to 4000 psi. Hold 4000 psi & Chart for
30 minute test. Bleed Tubing to 2500 psi. Pressure Annulus to
4500 psi. Hold & Chart for 30 minute test. Bleed Annulus to "0",
Then bleed Tubing to "0". Pressure Annulus to 2300 psi to
shear RP Valve.
LID Landing Jt. Dry Rod in TWC. Test to 1000 psi from below.
N/D BOPE. Stand Stack back in Sub.
Test "I" Wire Hanger penetrator connection & Install Rotating
Adapter Seal.
N/U Adapter Flange & Tree.
Test" I " Wire. Test Adapter Flange & Tree to 5000 psi.
R/U DSM Lubricator & Pull TWC.
PJSM wI all Hands. R/U Hot Oil & Test Lines to 3000 psi.
Reverse circulate 62 Bbls. Diesel down annulus holding 300
psi. back pressure on Tubing after Diesel turned corner.
Pumped total 62 Bbls. Allow to "U" Tube - Annulus & Tubing
Freeze Protected to 1802'.
Install BPV wI DSM Lubricator. Test from below to 1000 psi.
Suck out Cellar & Secure Well.
RIG RELEASED @ 20:00 HRS, 1 FEB. 2003
Printed: 2/3/2003 1233:46 PM
Legal Name:
Common Name:
Test Date
1 0/20/2002
1/19/2003
FIT
FIT
MPS-19
MPS-19
Test Type
TestDepth (TMD)
2,672.0 (ft)
7,835.0 (ft)
BR
Leak-Øff···Test·.·Sl,;ll'l1rna.ry.
T~sfDepth tIVD)
2,326.0 (ft)
4,341.0 (ft)
AMW
9.20 (ppg)
9.10 (ppg)
SorfacEfPtèssure ... >L~akOff pt¢S$l)r~(~J-IP)
245 (psi) 1,357 (psi)
440 (psi) 2,492 (psi)
EMW
11.23 (ppg)
11.05 (ppg)
~7
~--,'
Printed: 2/3/2003 12:33:28 PM
\
"
04-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19A L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 7,601.51' MD
Window / Kickoff Survey: 7,691.00' MD (if applicable)
Projected Survey: 11,630.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
MAR 2 6 2003
AJaska Qi-J & Gas Cons. CQmmiSlion
Anchorage
.:')
C)lQ)2078y
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19AL 1
-'"
Job No. AKZZ30008, Surveyed: 28 January, 2003
Survey Report
21 February, 2003
Your Ref: API 500292312160
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
'-~
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
SpE!r'r'V-!5UI!
DR~LLING 'seRVices
A Halliburton Company
Survey Ref: svy1121
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1
Your Ref: API 500292312160
Job No. AKZZ30008, Surveyed: 28 January, 2003
BP EXPLORA T/ON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7601.51 68.300 331.060 4193.74 4265.94 5437.57 N 520.08 E 6005417.25 N 566288.20 E 5264.65 Tie On Point
7691.00 67.820 330.740 4227.18 4299.38 5510.10 N 479.71 E 6005489.42 N 566247.19 E 0.631 5343.08 Window Point
7764.53 78.190 321.750 4248.68 4320.88 5568.33 N 440.61 E 6005547.30 N 566207.58 E 18.306 5407.22
7795.10 83.010 319.050 4253.67 4325.87 5591.55 N 421.39 E 6005570.36 N 566188.16 E 18.013 5433.43
7856.75 85.610 309.090 4259.80 4332.00 5634.15 N 377.36 E 6005612.57 N 566143.76 E 16.619 5483.03
7886.80 88.460 304.250 4261.35 4333.55 5652.07 N 353.30 E 6005630.27 N 566119.54 E 18.671 5504.85 _J
7918.69 90.740 300.710 4261.58 4333.78 5669.19 N 326.41 E 6005647.15 N 566092.50 E 13.203 5526.38
7961.84 88.580 294.000 4261.83 4334.03 5689.00 N 288.11 E 6005666.63 N 566054.02 E 16.335 5552.54
8014.01 89.380 282.310 4262.76 4334.96 5705.23 N 238.63 E 6005682.42 N 566004.40 E 22.456 5577.11
8056.43 85.980 275.820 4264.48 4336.68 5711.90 N 196.80 E 6005688.73 N 565962.52 E 17.259 5590.95
8105.65 85.800 265.850 4268.02 4340.22 5712.62 N 147.78 E 6005689.01 N 565913.49 E 20.207 5600.17
8155.02 88.890 258.520 4270.31 4342.51 5705.91 N 98.96 E 6005681.87 N 565864.73 E 16.096 5602.04
8197.66 87.650 253.230 4271.60 4343.80 5695.52 N 57.64 E 6005671.11 N 565823.51 E 12.737 5598.98
8246.93 88.270 247.990 4273.35 4345.55 5679.18 N 11.21 E 6005654.36 N 565777.22 E 10.703 5590.95
8291.46 89.880 240.690 4274.07 4346.27 5659.91 N 28.89 W 6005634.74 N 565737.29 E 16.785 5578.94
8340.68 91.730 235.610 4273.38 4345.58 5633.95 N 70.68 W 6005608.42 N 565695.73 E 10.983 5560.63
8385.16 92.840 230.200 4271.61 4343.81 5607.15 N 106.12W 6005581.31 N 565660.53 E 12.406 5540.39
8435.66 93.580 224.820 4268.78 4340.98 5573.11 N 143.29 W 6005546.94 N 565623.67 E 10.737 5513.32
8477.73 93.770 221.750 4266.08 4338.28 5542.55 N 172.07 W 6005516.13 N 565595.16 E 7.296 5488.23
8528.04 92.780 215.250 4263.20 4335.40 5503.26 N 203.32 W 6005476.57 N 565564.25 E 13.048 5454.96
8569.74 94.080 209.450 4260.70 4332.90 5468.11 N 225.58 W 6005441.22 N 565542.30 E 14.229 5424.21
8619.67 93.890 202.420 4257.23 4329.43 5423.35 N 247.35 W 6005396.27 N 565520.93 E 14.051 5383.91
8663.65 93.090 196.530 4254.55 4326.75 5381.98 N 261.98 W 6005354.77 N 565506.66 E 13.491 5345.71 , J
8712.75 94.700 188.100 4251.21 4323.41 5334.17 N 272.42 W 6005306.87 N 565496.64 E 17.440 5300.43 ---
8759.42 93.770 181.380 4247.76 4319.96 5287.81 N 276.26 W 6005260.48 N 565493.21 E 14.497 5255.45
8803.25 91.360 174.980 4245.80 4318.00 5244.07 N 274.87 W 6005216.76 N 565494.99 E 15.588 5212.14
8850.25 91.540 171.640 4244.61 4316.81 5197.41 N 269.40 W 6005170.15 N 565500.87 E 7.114 5165.24
8899.24 91.360 170.330 4243.37 4315.57 5149.05 N 261.73 W 6005121.85 N 565508.97 E 2.698 5116.27
8940.53 91.110 170.470 4242.48 4314.68 5108.34 N 254.84 W 6005081.21 N 565516.21 E 0.694 5074.99
8983.92 87.100 171.090 4243.15 4315.35 5065.53 N 247.89 W 6005038.46 N 565523.54 E 9.352 5031.62
9033.40 84.130 174.140 4246.94 4319.14 5016.61 N 241.55 W 6004989.60 N 565530.31 E 8.590 4982.35
9081 .19 87.530 180.420 4250.42 4322.62 4969.04 N 239.29 W 6004942.04 N 565532.99 E 14.911 4935.10
9126.80 89.570 182.270 4251.57 4323.77 4923.46 N 240.36 W 6004896.46 N 565532.32 E 6.037 4890.40
9173.82 90.000 182.720 4251.75 4323.95 4876.48 N 242.41 W 6004849.47 N 565530.69 E 1.324 4844.49
9220.42 91.540 179.420 4251.12 4323.32 4829.90 N 243.28 W 6004802.88 N 565530.23 E 7.814 4798.77
21 February, 2003 - 17:54 Page2of5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1
Your Ref: API 500292312160
Job No. AKZZ30008, Surveyed: 28 January, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9269.13 90.310 176.750 4250.33 4322.53 4781.23 N 241.65 W 6004754.23 N 565532.28 E 6.034 4750.56
9314.42 87.280 174.890 4251.29 4323.49 4736.08 N 238.35 W 6004709.11 N 565535.98 E 7.849 4705.52
9362.92 86.360 174.140 4253.98 4326.18 4687.88 N 233.73 W 6004660.94 N 565541.03 E 2.446 4657.24
9410.41 86.730 175.250 4256.84 4329.04 4640.68 N 229.34 W 6004613.79 N 565545.83 E 2.460 4610.00
9459.04 87.280 176.130 4259.38 4331.58 4592.25 N 225.69 W 6004565.39 N 565549.91 E 2.132 4561.68
9503.00 88.400 177.500 4261.04 4333.24 4548.39 N 223.25 W 6004521.56 N 565552.73 E 4.024 4518.06 -~.j
9548.43 87.720 178.920 4262.57 4334.77 4503.01 N 221.84 W 6004476.19 N 565554.55 E 3.464 4473.12
9595.22 87.650 178.420 4264.46 4336.66 4456.27 N 220.75 W 6004429.46 N 565556.05 E 1.078 4426.90
9642.95 87.41 0 181.230 4266.52 4338.72 4408.59 N 220.60 W 6004381.79 N 565556.61 E 5.903 4379.92
9689.06 87.650 183.700 4268.51 4340.71 4362.57 N 222.59 W 6004335.75 N 565555.04 E 5.377 4334.95
9734.47 89.630 184.510 4269.59 4341.79 4317.29 N 225.84 W 6004290.45 N 565552.19 E 4.711 4290.92
9780.51 89.510 184.350 4269.93 4342.13 4271.39 N 229.39 W 6004244.51 N 565549.04 E 0.434 4246.33
9827.38 91.300 184.530 4269.60 4341.80 4224.67 N 233.02 W 6004197.76 N 565545.82 E 3.838 4200.95
9873.67 91.360 184.470 4268.53 4340.73 4178.53 N 236.65 W 6004151.59 N 565542.60 E 0.183 4156.14
9921.56 91.170 183.370 4267.47 4339.67 4130.77 N 239.92 W 6004103.80 N 565539.74 E 2.330 4109.67
9965.30 91.360 183.420 4266.50 4338.70 4087.11 N 242.51 W 6004060.13 N 565537.54 E 0.449 4067.13
10016.47 91.910 185.070 4265.04 4337.24 4036.11 N 246.30 W 6004009.09 N 565534.20 E 3.398 4017.56
10057.74 91.670 185.540 4263.75 4335.95 3995.03 N 250.11 W 6003967.98 N 565530.75 E 1.278 3977.77
10104.78 88.950 188.830 4263.50 4335.70 3948.37 N 256.00 W 6003921.27 N 565525.28 E 9.074 3932.84
10151.00 89.880 192.350 4263.97 4336.17 3902.95 N 264.49 W 6003875.78 N 565517.19 E 7.877 3889.58
10196.55 90.800 194.130 4263.70 4335.90 3858.61 N 274.92 W 6003831.35 N 565507.15 E 4.399 3847.73
10242.86 90.990 193.630 4262.98 4335.18 3813.66 N 286.03 W 6003786.30 N 565496.44 E 1.155 3805.39
10292.30 90.430 193.450 4262.37 4334.57 3765.60 N 297.60 W 6003738.14 N 565485.29 E 1.190 3760.07
10336.03 90.060 193.000 4262.18 4334.38 3723.03 N 307.61 W 6003695.49 N 565475.66 E 1.332 3719.88 .~
10381.35 90.490 193.620 4261.96 4334.16 3678.93 N 318.04 W 6003651.29 N 565465.61 E 1.665 3678.26
10425.94 90.560 193.380 4261.55 4333.75 3635.57 N 328.45 W 6003607.85 N 565455.59 E 0.561 3637.37
10477.37 90.430 193.630 4261.11 4333.31 3585.57 N 340.46 W 6003557.74 N 565444.02 E 0.548 3590.21
10518.78 90.860 193.980 4260.64 4332.84 3545.36 N 350.34 W 6003517.44 N 565434.49 E 1.339 3552.33
10568.64 91.300 194.440 4259.70 4331.90 3497.03 N 362.58 W 6003469.01 N 565422.68 E 1.277 3506.86
10612.95 91.480 194.460 4258.63 4330.83 3454.13 N 373.63 W 6003426.02 N 565412.01 E 0.409 3466.54
10662.09 91.110 195.410 4257.52 4329.72 3406.67 N 386.29 W 6003378.44 N 565399.76 E 2.074 3421.99
10704.81 90.310 195.950 4256.99 4329.19 3365.54 N 397.84 W 6003337.21 N 565388.58 E 2.259 3383.49
10751.61 90.310 195.160 4256.73 4328.93 3320.46 N 410.38 W 6003292.02 N 565376.43 E 1.688 3341 .27
10799.98 88.460 194.540 4257.25 4329.45 3273.71 N 422.78 W 6003245.16 N 565364.45 E 4.034 3297.39
10849.55 88.580 193.960 4258.53 4330.73 3225.68 N 434.98 W 6003197.03 N 565352.67 E 1.194 3252.21
21 February, 2003 - 17:54 Page 3 of 5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1
Your Ref: API 500292312160
Job No. AKZZ30008, Surveyed: 28 January, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100tt)
10892.31 88.770 193.900 4259.52 4331.72 3184.19 N 445.27 W 6003155.45 N 565342.75 E 0.466 3213.13
10942.23 89.010 194.100 4260.49 4332.69 3135.76 N 457.34 W 6003106.92 N 565331.10 E 0.626 3167.54
10986.17 92.970 195.420 4259.73 4331.93 3093.28 N 468.53 W 6003064.35 N 565320.29 E 9.499 3127.65
11040.01 92.720 195.670 4257.06 4329.26 3041.48 N 482.94 W 6003012.41 N 565306.33 E 0.656 3079.13
11078.93 94.760 196.310 4254.52 4326.72 3004.15 N 493.64 W 6002974.99 N 565295.96 E 5.492 3044.23
11128.78 94.630 196.250 4250.44 4322.64 2956.45 N 507.57 W 6002927.18 N 565282.46 E 0.287 2999.68 ..-....,../
11171.55 94.880 196.070 4246.89 4319.09 2915.52 N 519.43 W 6002886.14 N 565270.96 E 0.719 2961.42
11222.33 95.380 195.780 4242.35 4314.55 2866.88 N 533.31 W 6002837.38 N 565257.51 E 1.137 2915.93
11264.95 95.190 195.030 4238.43 4310.63 2825.97 N 544.58 W 6002796.37 N 565246.60 E 1.808 2877.60
11311.41 95.010 194.150 4234.30 4306.50 2781.18 N 556.24 W 6002751.48 N 565235.33 E 1.926 2835.52
11357.55 95.070 193.690 4230.24 4302.44 2736.57 N 567.30 W 6002706.78 N 565224.67 E 1.002 2793.51
11405.39 95.440 194.000 4225.86 4298.06 2690.32 N 578.70 W 6002660.42 N 565213.68 E 1.007 2749.93
11450.97 98.680 195.890 4220.26 4292.46 2646.62 N 590.36 W 6002616.62 N 565202.40 E 8.213 2708.93
11496.23 99.360 195.900 4213.16 4285.36 2603.63 N 602.60 W 6002573.53 N 565190.54 E 1.503 2668.71
11542.87 99.170 195.780 4205.66 4277.86 2559.35 N 615.16W 6002529.14 N 565178.37 E 0.480 2627.29
11561.10 99.110 195.880 4202.76 4274.96 2542.03 N 620.07 W 6002511.78 N 565173.61 E 0.634 2611.08
11630.00 99.110 195.880 4191.85 4264.05 2476.59 N 638.69 W 6002446.18 N 565155.57 E 0.000 2549.88 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True). ..-,
Magnetic Declination at Surface is 25.611 0(28-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11630.00ft.,
The Bottom Hole Displacement is 2557.62ft., in the Direction of 345.539° (True).
21 February, 2003 - 17:54
Page 4 of 5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS· MPS·19AL 1
Your Ref: API 500292312160
Job No. AKZZ30008, Surveyed: 28 January, 2003
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7601.51
7691.00
11630.00
4265.94
4299.38
4264.05
5437.57 N
5510.10 N
2476.59 N
520.08 E
479.71 E
638.69 W
Tie On Point
Window Point
Projected Survey
----
Survey tool program for MPS-19AL 1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
0.00 176.00
176.00 11630.00
176.00 Tolerable Gyro(MPS-19)
4264.05 AK-6 BP _IFR-AK(MPS-19)
.~
21 February, 2003 . 17:54
Page 5 of 5
DrffIQuest~0~0¿002
)
)
04-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19A L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 7,601.51 ' MD
Window / Kickoff Survey: 7,691.00' MD (if applicable)
Projected Survey: 11,630.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
MAR 2 6 2003
Alaska Oif & Gas Con
Anch~ Commistion
c5j{Eì-d 8 t/
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19AL1 MWD
------
Job No. AKMW30008,
Survey Report
21 February, 2003
Your Ref: API 500292312160
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
c___
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
5pe..........y-5Uf1
DRILLING seRVices
A Halliburton Company
Survey Ref: svy1124
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1 MWD
Your Ref: API 500292312160
Job No. AKMW3000B,
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7601.51 68.300 331.060 4193.74 4265.94 5437.57 N 520.08 E 6005417.25 N 566288.20 E 5264.65 Tie On Point
MWD Magnetic
. 7691.00 67.820 330.740 4227.18 4299.38 '" 5510.10N 479.71 E 6005489.42 N 566247.19 E 0.631 5343.08 Window Point
7764.53 78.190 321.750 4248.68 4320.88 5568.33 N 440.61 E 6005547.30 N 566207.58 E 18.306 5407.22
7795.10 83.010 319.050 4253.67 4325.87 5591.55 N 421.39 E 6005570.36 N 566188.16 E 18.013 5433.43
7856.75 85.610 309.090 4259.80 4332.00 5634.15 N 377.36 E 6005612.57 N 566143.76 E 16.619 5483.03
~
7886.80 88.460 306.590 4261.35 4333.55 5652.56 N 353.67 E 6005630.77 N 566119.90 E 12.608 5505.27
7918.69 90.740 302.570 4261.58 4333.78 5670.65 N 327.42 E 6005648.63 N 566093.50 E 14.491 5527.65
7961.84 88.580 294.000 4261.83 4334.03 5691.08 N 289.46 E 6005668.72 N 566055.36 E 20.481 5554.36
8014.01 89.380 281.470 4262.76 4334.96 5706.94 N 239.88 E 6005684.14 N 566005.64 E 24.063 5578.58
8056.43 85.980 273.820 4264.48 4336.68 5712.57 N 197.91 E 6005689.41 N 565963.62 E 19.719 5591.42
8105.65 85.800 265.840 4268.02 4340.22 5712.43 N 148.85 E 6005688.83 N 565914.57 E 16.175 5599.80
8155.02 88.890 259.140 4270.31 4342.51 5705.98 N 99.99 E 6005681.95 N 565865.77 E 14.930 5601.93
8197.66 87.650 252.160 4271.59 4343.79 5695.43 N 58. 73 E 6005671.03 N 565824.60 E 16.618 5598.70
8246.93 88.270 246.340 4273.35 4345.55 5677.99 N 12.70 E 6005653.19 N 565778.73 E 11.872 5589.52
8291.46 89.880 240.580 4274.07 4346.27 5658.10 N 27.11 W 6005632.96 N 565739.09 E 13.429 5576.85
8340.68 91.730 234.760 4273.38 4345.58 5631.80 N 68.68 W 6005606.28 N 565697.76 E 12.406 5558.16
8385.16 92.840 229.430 4271.60 4343.80 5604.50 N 103.73 W 6005578.68 N 565662.94 E 12.230 5537.37
8435.66 93.580 224.600 4268.77 4340.97 5570.14 N 140.61 W 6005543.99 N 565626.37 E 9.661 5509.93
8477.73 93.770 221.050 4266.08 4338.28 5539.35 N 169.14 W 6005512.95 N 565598.11 E 8.433 5484.57
8528.04 92.780 215.280 4263.20 4335.40 5499.88 N 200.16 W 6005473.21 N 565567.44 E 11.618 5451.08
8569.74 94.080 209.890 4260.70 4332.90 5464.82 N 222.57 W 6005437.95 N 565545.34 E 13.274 5420.44
8619.67 93.890 202.590 4257.23 4329.43 5420.17 N 244.58 W 6005393.12 N 565523.73 E 14.590 5380.30
8663.65 93.090 196.810 4254.55 4326.75 5378.86 N 259.37 W 6005351 .68 N 565509.30 E 13.243 5342.18 '-'
8712.75 94.700 188.370 4251.21 4323.41 5331.10 N 270.04 W 6005303.82 N 565499.05 E 17.460 5297.00
8759.42 93.770 181.770 4247.76 4319.96 5284.76 N 274.15 W 6005257.45 N 565495.35 E 14.243 5252.08
8803.25 91.360 175.450 4245.79 4317.99 5241.02 N 273.09 W 6005213.72 N 565496.80 E 15.418 5208.81
8850.25 91.540 171.890 4244.60 4316.80 5194.32 N 267.91 W 6005167.07 N 565502.39 E 7.582 5161.93
8899.24 91.360 170.850 4243.36 4315.56 5145.91 N 260.56 W 6005118.72 N 565510.17 E 2.154 5112.97
8940.53 91.110 170.770 4242.47 4314.67 5105.15 N 253.97 W 6005078.03 N 565517.12 E 0.636 5071.70
8983.92 87.100 172.100 4243.15 4315.35 5062.26 N 247.51 W 6005035.20 N 565523.96 E 9.737 5028.34
21 February, 2003 - 17:56
Page 2 of 5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1 MWD
Your Ref: API 500292312160
Job No. AKMW3000B,
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim~ Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9033.40 84.130 174.280 4246.94 4319.14 5013.29 N 241.65W 6004986.27 N 565530.24 E 7.438 4979.08
9081 .19 87.530 180.210 4250.41 4322.61 4965.70 N 239.37 W 6004938.71 N 565532.94 E 14.273 4931.83
9126.80 89.570 182.590 4251.57 4323.77 4920.13 N 240.48 W 6004893.13 N 565532.23 E 6.871 4887.14
9173.82 90.000 182.900 4251.74 4323.94 4873.16 N 242.74 W 6004846.14 N 565530.39 E 1.127 4841 .28
9220.42 91.540 179.530 4251.12 4323.32 4826.59 N 243.72 W 6004799.56 N 565529.81 E 7.950 4795.58
9269.13 90.310 177.210 4250.33 4322.53 4777.91 N 242.34 W 6004750.90 N 565531.63 E 5.390 4747.40 .~
9314.42 87.280 175.420 4251.28 4323.48 4732.73 N 239.43 W 6004705.74 N 565534.93 E 7.770 4702.40
9362.92 86.360 174.190 4253.97 4326.17 4684.50 N 235.05 W 6004657.56 N 565539.74 E 3.164 4654.15
9410.41 86.730 175.560 4256.84 4329.04 4637.29 N 230.81 W 6004610.39 N 565544.39 E 2.983 4606.92
9459.04 87.280 176.460 4259.38 4331.58 4588.84 N 227.43 W 6004561.97 N 565548.20 E 2.167 4558.62
9503.00 88.400 177.900 4261.03 4333.23 4544.97 N 225.27 W 6004518.12 N 565550.75 E 4.148 4515.04
9548.43 87.720 179.280 4262.57 4334.77 4499.58 N 224.15 W 6004472.7 4 N 565552.26 E 3.385 4470.15
9595.22 87.650 178.650 4264.46 4336.66 4452.84 N 223.31 W 6004426.01 N 565553.52 E 1.354 4423.97
9642.95 87.41 0 181 . 150 4266.52 4338.72 4405.16 N 223.23 W 6004378.33 N 565554.02 E 5.257 4376.99
9689.06 87.650 183.620 4268.51 4340.71 4359.13 N 225.14 W 6004332.29 N 565552.51 E 5.377 4332.00
9734.47 89.630 184.370 4269.58 4341.78 4313.85 N 228.31 W 6004286.98 N 565549.75 E 4.662 4287.96
9780.51 89.510 184.330 4269.93 4342.13 4267.94 N 231.80 W 6004241.04 N 565546.66 E 0.275 4243.35
9827.38 91.300 184.460 4269.60 4341.80 4221.21 N 235.39 W 6004194.28 N 565543.48 E 3.829 4197.96
9873.67 91.360 184.430 4268.52 4340.72 4175.07 N 238.98 W 6004148.12 N 565540.30 E 0.145 4153.14
9921.56 91 .170 183.370 4267.47 4339.67 4127.31 N 242.23 W 6004100.32 N 565537.47 E 2.248 4106.67
9965.30 91.360 183.490 4266.50 4338.70 4083.66 N 244.85 W 6004056.65 N 565535.24 E 0.514 4064.13
10016.47 91.910 185.400 4265.04 4337.24 4032.66 N 248.81 W 6004005.62 N 565531.72 E 3.883 4014.60
10057.74 91.670 185.910 4263.75 4335.95 3991.61 N 252.88 W 6003964.54 N 565528.02 E 1.365 3974.88
101Q4.78 88.950 189.340 4263.50 4335.70 3945.00 N 259.12 W 6003917.88 N 565522.19 E 9.305 3930.06 ---
10151.00 89.880 192.620 4263.97 4336.17 3899.64 N 267.92 W 6003872.44 N 565513.79 E 7.376 3886.92
10196.55 90.800 194.980 4263.70 4335.90 3855.41 N 278.78 W 6003828.11 N 565503.31 E 5.561 3845.24
10242.86 90.990 194.560 4262.98 4335.18 3810.63 N 290.59 W 6003783.23 N 565491.90 E 0.995 3803.20
10292.30 90.430 194.900 4262.36 4334.56 3762.82 N 303.16 W 6003735.31 N 565479.76 E 1.325 3758.30
10336.03 90.060 194.090 4262.18 4334.38 3720.48 N 314.10W 6003692.88 N 565469.18 E 2.036 3718.51
10381.35 90.490 194.170 4261.96 4334.16 3676.54 N 325.17 W 6003648.84 N 565458.51 E 0.965 3677.15
10425.94 90.560 194.140 4261.55 4333.75 3633.30 N 336.07 W 6003605.51 N 565447.99 E 0.171 3636.46
10477.37 90.430 194.050 4261.11 4333.31 3583.42 N 348.59 W 6003555.52 N 565435.90 E 0.307 3589.51
10518.78 90.860 194.360 4260.64 4332.84 3543.28 N 358.76 W 6003515.29 N 565426.09 E 1.280 3551.75
10568.64 91.300 194.800 4259.70 4331.90 3495.04 N 371.30 W 6003466.94 N 565413.97 E 1.248 3506.41
10612.95 91.480 194.630 4258.63 4330.83 3452.19 N 382.56 W 6003424.00 N 565403.10 E 0.559 3466.18
21 February, 2003 - 17:56 Page 3 of 5 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1 MWD
Your Ref: API 500292312160
Job No. AKMW3000B.
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
10662.09 91.110 195.630 4257.51 4329.71 3404.77 N 395.38 W 6003376.46 N 565390.69 E 2.169 3421.70
10704.81 90.310 196.090 4256.99 4329.19 3363.68 N 407.05 W 6003335.27 N 565379.38 E 2.160 3383.26
10751.61 90.310 195.340 4256.73 4328.93 3318.63 N 419.73 W 6003290.11 N 565367.10 E 1.603 3341 .1 0
10799.98 88.460 194.780 4257.25 4329.45 3271.92 N 432.29 W 6003243.30 N 565354.95 E 3.996 3297.28
10849.55 88.580 194.260 4258.53 4330.73 3223.95 N 444.72 W 6003195.22 N 565342.95 E 1.076 3252.20
10892.31 88.770 194.180 4259.52 4331.72 3182.51 N 455.22 W 6003153.69 N 565332.81 E 0.482 3213.21 -~
10942.23 89.010 194.050 4260.49 4332.69 3134.11N 467.39 W 6003105.18 N 565321.07 E 0.547 3167.66
10986.17 92.970 195.450 4259.73 4331.93 3091.63 N 478.57 W 6003062.61 N 565310.26 E 9.559 3127.77
11040.01 92.720 195.780 4257.06 4329.26 3039.85 N 493.05 W 6003010.69 N 565296.24 E 0.768 3079.28
11078.93 94.760 196.360 4254.52 4326.72 3002.53 N 503.80 W 6002973.28 N 565285.82 E 5.448 3044.40
11128.78 94.630 196.250 4250.44 4322.64 2954.84 N 517.75 W 6002925.48 N 565272.29 E 0.341 2999.86
11171.55 94.880 196.300 4246.89 4319.09 2913.93 N 529.69 W 6002884.46 N 565260.71 E 0.596 2961.64
11222.33 95.380 195.910 4242.35 4314.55 2865.34 N 543.72 W 6002835.75 N 565247.11 E 1.247 2916.22
11264.95 95.190 195.190 4238.43 4310.63 2824.45 N 555.10 W 6002794.76 N 565236.09 E 1.740 2877.93
11311.41 95.010 194.270 4234.30 4306.50 2779.70 N 566.86 W 6002749.90 N 565224.72 E 2.010 2835.90
11357.55 95.070 193.990 4230.24 4302.44 2735.13 N 578.08 W 6002705.24 N 565213.90 E 0.618 2793.96
11405.39 95.440 194.200 4225.86 4298.06 2688.92 N 589.69 W 6002658.93 N 565202.70 E 0.888 2750.47
11450.97 98.680 195.990 4220.26 4292.46 2645.26 N 601.46 W 6002615.16 N 565191.31 E 8.106 2709.51
11496.23 99.360 196.040 4213.16 4285.36 2602.29 N 613.79 W 6002572.09 N 565179.36 E 1.506 2669.34
11542.87 99.170 195.930 4205.65 4277.85 2558.04 N 626.47 W 6002527.73 N 565167.07 E 0.469 2627.96
11561.10 99.110 196.080 4202.76 4274.96 2540.74 N 631.43 W 6002510.39 N 565162.26 E 0.877 2611.79
11630.00 99.110 196.080 4191.85 4264.05 2475.37 N 650.28 W 6002444.85 N 565144.00 E 0.000 2550.68 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. ~
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.622°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11630.00ft.,
The Bottom Hole Displacement is 2559.36ft., in the Direction of 345.281° (True).
21 February, 2003 - 17:56
Page 4 of 5
DriflQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19AL 1 MWD
Your Ref: API 500292312160
Job No. AKMW30008,
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7601.51
7691.00
11630.00
4265.94
4299.38
4264.05
5437.57 N
5510.10 N
2475.37 N
520.08 E
479.71 E
650.28 W
Tie On Point
Window Point
Projected Survey
"~
Survey tool program for MPS-19AL 1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
7601.51
0.00
176.00
4265.94
176.00
7601.51
11630.00
176.00
4265.94
4264.05
Tolerable Gyro(MPS-19)
AK-6 BP _IFR-AK(MPS-19)
MWD Magnetic(MPS-19AL 1 MWD)
',~
21 February, 2003 - 17:56
Page 5 of 5
DrillQuest 3.03.02.002
)
')
W.ELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
3 33 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
~bé).-cX3cj
!ISß
February 19, 2003
RE: MWD Formation Evaluation Logs MPS-19AL1,
1 LIS fonnatted Disc with verification listing.
API#: 50-029-23121-60
AK-MW-30008
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling SeMces
Attn: Rob Kalish
6900 Arctic Blvd,
Anchorage, Alaska 99648
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
rJk.p~ )
RECEIVED
FEB 2 6 200J
AlIMa Qf & Gas r',,_~ . .
wvrl..., "",-,,"11I3IfOn
AnChorage
)
')
~ t;-;:.1~t:.--;:¡ t
'! ^ '
! il I
Ch !...J\. U ¡
~ f ~~~~~,~!Æ
FRANK H. MURKOWSKI, GOVERNOR
AliA~1iA OILA5D GAS
CONSERVATION COMMISSION
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, Alaska 99519
Re: Mile Point Unit MPS-19ALl
BP Exploration (Alaska), Inc.
Permit No: 202-234
Surface Location: 3308' NSL, 195' WEL, Sec. 12, TI2N, RI0E, UM
Bottomhole Location: 539' NSL, 827' WEL, Sec. 01, TI2N, RI0E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well MPU MPS-19A, Permit No 202-233,
API 50-029-23121-01.< Production should continue to be reported as a function of the original
API number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~rA-4/
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this :2.3~day of December, 2002
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
') STATE OF ALASKA ')
ALASKA O.a.;. AND GAS CONSERVATION COMMlb.~..lbN
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test III Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan KBE = 68' Milne Point Unit I Schrader
6. Property Designation Bluff
ADL 380109
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPS·19AL 1
9. Approximate spud date
01/01/03 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11611' MD 14302' TVD
o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
92 Maximum surface 1516 psig, At total depth (TV D) 43361 / 1950 psig
Setting Depth
Top Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
39311 7680' 4292' 11611' 4302' Uncemented Slotted Liner
1 a. Type of work 0 Drill III Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
33081 NSL, 195' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
3534' NSL, 4471' WEL, SEC. 06, T12N, R11 E, UM, ('OA'Target2)
At total depth
539' NSL, 827' WEL, SEC. 01, T12N, R10E, UM, ('OA'Target2)
12. Distance to nearest property line 13. Distance to nearest well
ADL 380110,827' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 7680' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade COUDlina
4-1/21 12.7# L-80 BTC
Hole
6-1/8"
V~GA- 1'2/1-'5/0~-
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 10634 feet Plugs (measured)
true vertical 4294 feet
Effective depth: measured 10634 feet Junk (measured)
true vertical 4294 feet
Casing Length Size Cemented
8114' 44501
7800' - 10634' 43361 - 4294'
RECEIVED
DEe 0 6 2002
Alaska Oil & Gas Co
4nobn . nS. Commi~çion
III Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch -.'BUJang Program
III Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Sandra Stewman, 564-4750
21.ls~:~::YC::~~:tthef':5in~;£;edtO:E:E:::~Engineer Date! ¿/ 0 5/ô2-
Permit Number API Number APr~.O~~IPIfaÅe-1. See cover letter
.2.<::12.- z371 50-029-23121-60 "¡:/VJ(j/\ forotherreauirements
Conditions of Approval: Samples Required 0 Yes 18 No Mud Log Require v 0 Yes IE No
Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required ~ Yes 0 No
Required Working Pressur~ for BÇ)PE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T{I·<;.r- I?aPE ~"', ifoco f(t.
Structural
Conductor
Su rface
Intermediate
Production
Liner
112' 20"
2637' 9-5/8"
8114' 7"
28341 4-1/2"
Perforation depth: measured
None
true vertical
None
20. Attachments
MD
TVD
260 sx Arctic Set (Approx.)
786 sx PF ILl, 225 sx Class 'G'
112'
2637'
112'
2347'
75 sx Class 'E', 273 sx Class 'G'
Uncemented Slotted Liner
Approved By
Form 10-401 Rev. 12-01-85
ORV71NAI SIGNFO ~V\ G0,rnmissioner ~ '1,
M L Bill .
by order of
the commission
Date I j~ /:;(-) 10 )-
~Ub~it In ~~iPlicate
I ') r )e Point MPS-19A Well Permit
I Well Name: 1M PS-19AL 1
Drill and Complete Plan Summary
I Type of Well (service 1 producer 1 injector): 1 Multi Lateral Producer "OA" sand
Surface Location:
1971' FNL, (3308' FSL), 195' FEL, (5085' FWL), SEC. 12, T12N, R10E
X=565816.01 Y=5999975.08
1745' FNL, (3534' FSL), 4471' FEL, (287' FWL), SEC. 06, T12N, R11 E
E=566249.56 N=6005484.61 Z=4291, TVD
4741' FNL, (539' FSL), 827' FEL, (4452' FWL), SEC. 01, T12N, R10E
E=565161.00 N=6002480.0 Z=4302' TVD
Target Location 2:
TOP "OA"
Target Location 2:
BHL "OA" Well TD
I Objective: 1
Schrader OA Sand
RiQ: 1 Doyon 14 I
I Operating days to complete: 19 1
I Max Inc: 192 1 I KOP: 176801 I KBE: 168 1
1
1
I AFE Number: I
I Estimated Start Date: 101 Jan 03
I MD: 111611 1 1 TVD: 14302 I
I Well DesiQn (conventional, slim hole, etc.): I Sidetrack ML Producer
Mud Program:
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
KCL-CaC03 Flow Pro
PH API Filtrate LG
Solids
<12
8.6 - 9.20 40 55 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Sluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be
ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1
Evaluation Program:
6-1/8" Hole section:
Open Hole: MWD/GRlRES ABI/IFR/CASANDRA
1
-)
CasinglTubing Program:
~r )~ Point MPS-19A Well Permit
Hole Size Csgl WtlFt Grade Conn Length Top Bottom
Tbg O.D. M DrrVDrkb MD I TVDrkb
42" 20" 92# H-40 Welded 112' 0' 112'/112'
12-1/4" 9-5/8" 29.7# L-80 BTC 2637' 0' 2637'/2347'
9-5/8" 7" 26# L-80 BTC 8114' 0' 8114'/4450'
6-1/8" . 4-1 /2" 12.7# L-80 BTC 3931' 7680'/4292' 11611 '/4302'
*The 20" casing is insulated
Recommended Bit Program:
BHA
Hole
Size
6-1/4"
Depth (MD)
Bit Type Nozzle/Flow
rate
Security FM2643 3 - 12
1
7016' - TO
Well Control:
· Production hole will be drilled with a diverter.
Surface Interval
· Planned BOP test pressure:
1950 psi @ 4336' TVDrkb - Top of "OA"
1516 psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
Diverter will be function tested. BOP's: Test annular 250 psi low
And 2500 psi high, and rams to 250 psi low and 4,000 psi high.
N/A
9.2 ppg NaCI / 6.8 ppg Diesel
· Maximum anticipated BHP:
· Maximum surface pressure:
· Kick tolerance:
· Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
. Hydrates have not been seen on S pad, but have been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
2
')
n' )~ Point MPS-19A Well Permit
Lost Circulation
· We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
· It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· NA
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-19 has no anti-collision issues.
3
) Milne Pair )PS-19a Well Permit
DRILL & COMPLETION PROCEDURE
Pre- Rig Operations
1. The 20", 9-5/8" & 7" casing strings have already been installed as per the original permit
Procedure
l.MIRU, NU and test 13 %" 5m BO:e, and test annular to 250 low and 2500 high. Test the rams
to 250 low and 4000 psi high /'
2. Test casing to 3,500 psi
3. Pick up bit and 3-1/2" drill pipe and RIH
4. Drill out cement to float collar, POOH
5. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at top of the OA interval (7800' MD).
b. Shear off and mill window thru 7" casing.
6. Drill 1 st 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH. ~--".._" .","'"
7. Run 4 ~" slotted liner with liner hanger wit 5 ' of lap
8. Make up Baker Window Master milling assem ïy with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at (7680' MD)
b. Shear off and mill window thru 7" casing.
9. Drill 2nd 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
10. MU whipstock retrieving tool and pull whipstock
11. Run 4 ~" slotted liner with Baker Hook Hanger and hang off in 7" casing
12. POOH
13. TIH and displace out drilling mud with 9.2 ppg NaCl
14. POOH
15. Run in hole with 4-1/2" jet pump completion as per schematic
16. Land tubing hanger and test
17. Set BPV
18. ND BOP
19. Install and test tree
20. Pull BPV
21. Drop ball and set production packer
22. Test 7" x 4-1/2" annulus and packer to 3500 psi
23. Freeze protect thru GLM
24. Install BPV and secure the well
25. RD/MO
4
Tree: Cameron 7-1/16", 5r'-)
Wellhead: FMC 11" gen 5 casing
hanger.
MPU S-19i
20"x 34" insulated, 215 #/ft A-53 [J!Ð ..
KOP @ 590'
Max. hole angle = 71 deg @ 6850
Hole angle thru' perfs =
95/8" 40#, L-80, BTRC Casing
(drift ID = 8.679, Ann cap.= .0282 bpf)
9 5/8" Howco float shoe
I 2637' I ~
7" 26#, L-80, BTRC Casing
(drift ID = 6.151, cap.= .0383 bpf)
Perforation Summary
Size Spf
Interval
OA Sands
(TVO)
08 Sands
~
~
DATE
11/13/02
REV. BY
J.Jones
COMMENTS
Drilled by Doyon 141
)rig. OF Elev. = 66.00'
Orig. GL Elev. = 38.50'
c'Un--eJl+
r Halliburton Float Collar
r Halliburton float shoe
8029'
8112'
MILNE POINT UNIT
WELL No.: S-19i
API : 50-029-23121-00
BP EXPLORATION (AK)
1121
I\"J~Osi-JOSi=.LJ GOMPLi=. liON )
11t...Þ -11.A& S--9AL
~~~~
20" 92 Iblft, H-40 Welded .IIIIIIIII .
Insulated
Diesel Freeze protect to
750' MD
KB. ELEV =66'
Cellar Box ELEV = 38.5'
TREE: Cameron 4-1/16" 5M
WELLHEAD: FMC Gen 5 11",5M
Tubing Head: 11" x 4-1/2",
FMC Tubing Hanger
...
9-5/8" 40#, L-80, BTC-M
Casing Drift: 8.679
Casing 10: 8.835
Coupling OD: 10.625"
Burst: 5,750 psi
Collapse: 3,090 psi
.
42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,200' MD , 2020' TVD
RP shear valve open position '
4-1/2", 12.61blft, L-80, IBT-M
Coupling 00: 5.2"
OriftllO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 800/0=6,000 psi
9.2 KCL with corrosion
inhibitor as packer fluid
~
~
U
III
, ... 19-518" 0 26S2'MD, 2356' TVD
BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down
to lower sensor)
7" 26#, L-80, BTC-M
Casing Drift: 6.151
Casing ID: 6.276
Coupling 00: 7.656"
Burst: 7,240 psi
Collapse: 5,410 psi
- -
."'!
,:. I
Halliburtion Dura Sleeve XD WIX Nipple (3.813" ID)
Phoenix Pressure Gauge (2.840" ID)
3-1/2" 'X' Nipple 2.813" ID
Jet Pump Installed in
Sliding Sleeve Post rig!
.
.
þ
7" x 3-1/2" Premier Packer
ISet @ 7630'MD, 4274' TVD I
3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod
Wireline Entry Guide
Window in 7" casing @ 7,680'
Well Inclination @ Window = 68 deg
\~
Multi-Lateral Junction 7,680·
6-1/8" OA Lateral 2 TD 11,611'
.......
~
-----
- -
OA Horizontal 6-1/8" hole
r--
-- -
- --
- -
- -
4-1/2" Slotted Liner W IHookwall hanger
Top liner @ 7,750' MD _______________
~,
.......
9-7/8" Hole
6-1/8"OALateraITD 110,634'1
Window in 7" casing @ 7,800'
Well Inclination @ Window = 68 deg
......
- -
- ---
OA Horizontal 6-1/8" hole
7" PSTD @ 8029' MD
7" Casing Shoe @ 8,112' MD
Well Inclination @ Shoe = 68 Degrees
~l
-- -
-----
4-1/2" Slotted Liner Wlliner hanger
DATE
05101102
REV. BY
SKC
COMMENTS
Level 3 Multi-Lateral, 4-112" Jet Pump Completion
Milne Point lInlt
WF=J J : ~-19A MI
API NO: 0'9-'3084-00 &
0'9·'3084-60
BP Exploration (Alaska)
Plan: MPS-19AL I "-1'05 (MPS-19/Plan MPS·19AL I
Created By: Ken Allen
SlJRYEY PROGRAM
Depth Fm D<pth To Sur",,)' Plan Tool
7680.00 6 Plano<d: MPS-t9ALI "pO> Y9 MWDelFR-MS
REFERENCE INFORMA nON
C(\-t.lfdil\1t~ (N-E) Rdcr¿~: Well Centr~; MPS-19. 1m¿ North
V¿rtka1 (TVD) Ref~renc~: RB 6650 66jO
Sð.:tion (VS) Ref~reoc~: Slot - (O.QI'h'l.o.OOE)
M<asumJ D<p<h Refer<nœ: RB 6650 6650
CakuIati..."1I1 Mctbod: Minimum Cun-".m¡re
Cak:ublÎon M~Ih.-"I: Mllumurn Cu....-a[ure
[nl}( S)"Slo:nr ISCWSA
~.jIn M':lhcxl: Tra..· Cyhralo..'T North
rrrl\f Surfa,~: Elhptk:a1 - Casing
Wamioj! McO...t Ruks 113,.,.1
ö
Slot
N!A
LOD£itude
149"27'50.676\V
Shape
POUll
Point
Point
Point
Polygon
Poilu
Easting
565161.00
565243.00
565514.00
565476.00
565069.00
565903.00
Latitude
70"2437348N
NooIring
6002480.00
6002788.00
6004347.00
6003623.00
6004953.00
6005320.00
WEll DEI AILS
Easting
565816.06
TARGET DETAILS
eN'-S
2510.60
2817.90
4374.60
3650.89
498455
534422
+Eí-W
-633.()2
-54830
-26355
·307.93
-70323
134.05
Nonhing
599997
WD
430250
431150
432050
432650
432650
434850
"зW
-528.99
Name
MPS·19 (SIOA T5
MPS-19 (SIOA T4
MPS-19 (SIOA T2
MPS-19 (S)OA D
MPS-19 Hard3
Mps·19 (SIOA T
eN'·S
2.0
Name
MPS-I
-.-J
Targe
MPS·19 (S)OA T2
MPS-19 (S)OA T3
MPS-19 (S)OA T4
MPS-19 (S)OA T5
Size
4.500
FORMATION TOP DETAILS
TVDPath MDPath Fonnation
4317.50 75 NF
CASING DETAILS
VSec
5220.84
5238.81
5431.93
5503.13
5504.09
5219.09
4419.72
4306.27
4293.14
3791.80
3615.38
3464.48
2898.81
2866.44
2589.18
Name
41/2'
776
.95
TFace
0.00
-25.00
-64.00
-90.00
-90.00
-89.86
0.00
102.99
89.91
0.00
81.48
85.50
0.00
-66.82
0.00
MD
161
TVD
4302.49
DLeg
0.00
12.00
17.00
16.00
6.00
16.00
0.00
4.00
4.00
0.00
4.00
4.00
0.00
4.00
0.00
SECTION DETAILS
+EI-W
482.08
472.80
293.99
98.08
-57.09
-300.51
-264.12
-263.55
-264.09
-287.36
-307.93
-347.36
-537.91
-548.30
-633.02
+N/-S
5505.79
5521. 99
5676.06
5700.09
5661.96
5306.67
4491.45
4374.60
4360.91
3838.02
3650.89
3485.33
2853.91
2817.90
2510.60
No.
No.
All TVD depths are
ssTVD plus 66.5'for RKBE.
TVD
4291.67
4298.86
4340.24
4336.50
4333.51
4326.45
4320.31
4320.50
4320.65
4326.30
4326.50
4324.22
4312.37
4311.50
4302.50
Azi
330.76
329.68
292.99
260.99
251.39
177.44
177.44
182.00
182.55
182.55
190.00
196.79
196.79
195.41
195.41
Inc
67.86
70.03
91.07
91.07
91.07
90.43
90.43
89.38
89.38
89.38
90.50
91.03
91.03
91.62
91.62
MD
1r"~·".00
) )"".00
;·q·,.oo
)0, I~ '.00
~ \11\.00
;()..7.15
.~,;¡ 4.20
·~71111.09
".; I '.78
III~' 7.23
11I~.'··.62
11I~·':·.93
11>'.57
11_'" 1.07
I ! t, 1.96
Sec
1
2
3
4
5
6
7
8
9
10
II
12
13
14
15
$boo
o
~~
.-...--
Start Dir 12/100' : 7680' MD, 4291.67'TVD
17/100': 7700' MO, 4298.86'TVD
'/000
Total Depth: 11611.96' MD. 4302.5' TYD
4000-
Start Die 6/100' : 8145' MD, 4336.5'TVD
. Ii """ DITI6!1oo' , 8305' MD, .m.mVD
!~ ~~ ___MJ'S-19 (!'t~I!.MPS-19AL--.....
f' ~~ S"'" Die 16/101"'945' MD, 4340.24WD
! MPS-19 (MPS-19
i
¡
¡
I I
5600
I
6000
I
5200
:., i J
&dDITI.1'
4800
Start Dir 4/100' : 9583.2' MD, 4320.31 'TVD
~nd D¡r : 9713.78' MD, L320.65' -V~ \
1 i i \l \ i
f , I 'I I'.. i
i ??oo1 ~ ,.rr;·I9 (5)OA T2
,I I
i . I I
, ~I"'. Dlt 4,'1(1)' .i 1023;2:' WD,i4316.3'TVD ¡
rlvD,!4324.22'T\D i I
I '. I
r I
i i
i I
i
4000 4400
Vertical Section at 345.850 [400ft/in]
1059
D
3600
MPS-l? (S)O-\ -3
i\
¡ \
::On
¡YO
r~ Mps·19 (S)OA T~ ¡
\~ : 1-00') ,
\\, ! :
\ s,artl,'...[W4érOO' :_1~55..57 M~. <.3*.3
:nc Olr : II 9~.O, MO.43 U I VO
¡ i ¡
I r
3200
MPS·19ALI wpO
I
! )0
-- .L- ~
___~ r
1 --4-ffl"-
- -- Mr~·I,)(:S' J
~
2400
E
¢:
o
o
:!.
.r:
Õ.
êS
ë'õ
'€ 4400
>
<>
:1
b
SURVEY PROGRAM Plan: MPS-19ALI \\'1'05 (MPS-19/Plan MPS-19ALl
D<pth Fm Depth To Sum,y'PLm Tool Created By: Ken Allen Date:
7680.00 11611.96 Pianœd:MPS-19ALl "1J05V9 M\~IFR~MS Cl1ecked: Dale:
Re\iewed: Date:
WELL DETAILS
NanJ" ~N-'-S ~FJ-W Northiog !$'1ing Lati~ loogjtuœ Slot
MPS-19 2.01 -528.99 599997531 565816.06 70024'37348N 149'2T50.676W NA
TARGET DETAILS
NanJ" lVD ~N'·S ~Ei-W Northing Easting Sha~
MPS-19 (SIOA T5 430250 2510.60 -633.02 6002480.00 65161.00 Point
MPS-19 (S¡OA T4 431150 2817.90 -54830 6002788.00 65243.00 Point
MPS-19 (S¡OA T2 432050 4374.60 -26355 6004347.00 65514.00 Point
MPS-19 (S¡OA D 432650 3650.89 -307.93 6003623.00 65476.00 Point
MPS-19 Hard3 432650 498455 -70323 6004953.00 65069_00 PO~ygoD
MPS-19 (S)OA TI 434850 534422 134.05 6005320.00 65903.00 PoUII
SECTION DETAILS
REFERENCE INFORMATIOX
Co-ordirot¿ (N EI Rerer~o.:¿: Well Ccmtre: MPS-19, Tm¿ North
V¿rtkal (TVD) Ref~reDC¿: RB 6650 6650
&c¡oo (VS) Ref¿œnœ: Slot - (O.OO}:,O.OOE)
M"",ured Depth Ref<renœ: RB 66.50 66.50
Cakulariùn Mdb....-.± Minimum CU!\-arur~
Cah.:1Jlalklll Mctht1l1: Minimum Curvalur~
Error Sy:Hc.'fII: ISCWSA
Sçan Method: Tr3vC\'lilvCrNooh
Em"fSurfa,."1:: IJliptiQ1 - Casing
W3minSl Mctlk'W.l: Rul.:s Ibso.xi
ò
/\
MPS-19 (Plan MPS-19A)
7945' MD. 4340.24'TVD
,
,
,
6000-
+FJ-W DLeg TF ace VSee Targe
482.08 0.00 0.00 5220.84
472.80 12.00 -25.00 5238.81
293.99 17.00 -64.00 5431.93
98.08 16.00 -90.00 5503. \3
-57.09 6.00 -90.00 5504.09
-300.51 16.00 -89.86 5219.09
-264.12 0.00 0.00 4419.72
-263.55 4.00 102.99 4306.27 MPS-19 (S)OA T2~
-264.09 4.00 89.91 4293.14
-287.36 0.00 0.00 3791.80
-307.93 4.00 81.48 3615.38 MPS-19 (S)OA T3
-347.36 4.00 85.50 3464.48
-537.91 0.00 0.00 2898.81
-548.30 4.00 -66.82 2866.44 MPS-19 (S)OA T4
-633.02 0.00 0.00 2589.18 MPS-19 (S)OA T5
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
4317.50 7761.95 NF
~
+N/-S
5505.79
5521.99
5676.06
5700.09
5661. 96
5306.67
4491.45
4374.60
4360.91
3838.02
3650.89
3485.33
2853.91
2817.90
2510.60
TVD
4291.67
4298.86
4340.24
4336.50
4333.51
4326.45
4320.31
4320.50
4320.65
4326.30
4326.50
4324.22
4312.37
4311.50
4302.50
Azi
330.76
329.68
292.99
260.99
251.39
177.44
177.44
182.00
182.55
182.55
190.00
196.79
196.79
195.41
195.41
Ine
67.86
70.03
91.07
91.07
91.07
90.43
90.43
89.38
89.38
89.38
90.50
91.03
91.03
91.62
91.62
MD
I"~II.OO
7nlll.00
¡··.h.OO
~IJ'i.OO
~11I'i.00
x7,,7.15
'''1< 1.20
Clillll.09
'1]1 1.78
III: '7.23
1'1.:1,";.62
III" I 'i.93
II ~···;.57
II ~., t07
I !t·ll.96
See
I
2
3
4
5
6
7
8
9
10
11
12
\3
14
15
17/100': 7700' MD, 4298.86'TVD
121100': 7680' MD, 4291.67'TVD
5400
Size
4.500
CASING DETAILS
No. TVD MD Name
4302.49 1611.95 4 1/2'
ø
-~- - -- /-$rHrJiY'4ltO')~~g!:2' M L>, 43 :W.31fVD
"':nj Dir : 97 3.78' MJ, 4320.65' rVf
---
2
MPS-I'J (S)OA
-----~--
4800
<=
2
o
o
~
:;-
:c
t:
~ 4200
:c
g
en
---~
J26.3'TVD
f' TVD
U7'1VI;>
n
Start Dir 61100': 8145' MD, 4336.5'TVD, MPS-19 (MPS-19)
StartDirI61100':8305'MD,4333.51'TYD .. \ \,1
-~ - -- -- ~~ -- --i--~ Start Dir 16/100'
_______~-¡ ?'_ un 3:[-; ,,,,"Do
I /EndDir:8167.p~'
----t
~ =--=- --
(-~
W-S-l-9-t--ar4~
02J7.2J'
43r
MD,
¡, Ene' DJ
1----
!
_ ---MPS.-~.'S)Ok'!. L S·" 0;, AID:' 115>57' MD
_ _ . _ -.:.. . -.--T"O';' '.1 J2?,.07'.,,,, -31 L
_ Iv r>s:=1'T1S~i~ A ~JE'5!I': I ó I .96' fAD, ""302.
4 1/2·\.fPS~¡9ALI ;:Vpis-
~1art Dir 4/0("
I 05~5.)3·
./
.......~-_.
IJ
S)JI.. .
MPS
--
3600
3000
RKBE.
All TVD depths are
ssTVD plus 66.5'for
I
600
-YD
West( - )/East(+) [600ft/in]
-600
200
2400
)
)
BP
KW A Planning Report MAP
Company:
Field:
Site:
Well:
Wenpath:
BP Amoco
Milne Point
M PtSPad
MPS" 19
Plan·. MPS-t9AL 1
Date:t1118/200g·.....·.·..Time: 11.:40:10 Page:
Ço-ordinat~(N'E}.R~fer~nce: Well: MPS-19, TrLteNqrth
Vertical (TYD) :a.efere..,ce: RB 66;50· 66.5
SectiontvS) Reference: Well (Q.OON,O.OOE ,345.85Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
Site: M Pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
Northing:
Easting:
5999978.00 ft
566345.00 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
0.00 ft
0.00 ft
Well:
MPS-19
Slot Name:
Well Position: +N/-S 2.01 ft Northing: 5999975.31 ft Latitude:
+E/-W -528.99 ft Easting: 565816.06 ft Longitude:
Position Uncertainty: 0.00 ft
70 24 37.348 N
149 27 50.676 W
Wellpath: Plan MPS-19AL 1
Plan: MPS-19AL 1 wp05
Date Composed:
Version:
Tied-to:
MPS-19
7680.00 ft
Mean Sea Level
25.71 deg
80.80 deg
Direction
deg
345.85
11/12/2002
9
From: Definitive Path
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
RB 66.50
1 0/21/2002
57503 nT
Depth From (TVD)
ft
0.00
Height 66.50 ft
Principal: Yes
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
11611.95 4302.49 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
7761.75 4317.50 NF 0.00 0.00
0.00 OA 0.00 0.00
Targets
Map Map <--- Latitude --> <-- Longitude -->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min Sec
Dip. Dir. ft ft ft ft ft
MPS-19 (S)OA T5 4302.50 2510.60 -633.02 6002480.00 565161.00 70 25 2.039 N 149 28 9.236 W
MPS-19 (S)OA T4 4311.50 2817.90 -548.30 6002788.00 565243.00 70 25 5.062 N 149 28 6.753 W
MPS-19 (S)OA T2 4320.50 4374.60 -263.55 6004347.00 565514.00 70 25 20.372 N 149 27 58.405 W
MPS-19 (S)OA T3 4326.50 3650.89 -307.93 6003623.00 565476.00 70 25 13.254 N 149 27 59.706 W
MPS-19 Hard3 4326.50 4984.55 -703.23 6004953.00 565069.00 70 25 26.370 N 149 28 11.302 W
-Polygon 1 4326.50 4984.55 -703.23 6004953.00 565069.00 70 25 26.370 N 149 28 11.302 W
·Polygon 2 4326.50 5726.66 -363.65 6005698.00 565401.99 70 25 33.669 N 149 28 1.343 W
MPS-19 (S)OA T1 4348.50 5344.22 134.05 6005320.00 565903.00 70 25 29.908 N 149 27 46.744 W
) BP )
KW A Planning Report MAP
Company: BPAmoco »ate.: 11,/18/2002. .. ... rime: 1 1:40: 10 Page: 2
Field: Milne Point CO"c)rdinate(NJJ:)Re~erence: VV~II: ·MPS-19, TrueNo.rth
Site: MPtSPad Vertical· (TV:Q):acfereqce: RB66.5066.5
Well: MPS-19 Section..(V'S).Ref~rence: Well (0.00N,O.OOE,345.85Azi)
Wellpath: Plan. MPS-19AL 1 Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azhn TVD +N/-S +E/-W DLS . Ø,dld Turn TFO Target
ft deg deg ft ft ft degl1· OOft·..· qØg/10Ç)ft.degI100ft deg
7680.00 67.86 330.76 4291.67 5505.79 482.08 0.00 0.00 0.00 0.00
7700.00 70.03 329.68 4298.86 5521.99 472.80 12.00 10.89 -5.39 -25.00
7945.00 91.07 292.99 4340.24 5676.06 293.99 17.00 8.59 -14.97 -64.00
8145.00 91.07 260.99 4336.50 5700.09 98.08 16.00 0.00 -16.00 -90.00
8305.00 91.07 251.39 4333.51 5661.96 -57.09 6.00 0.00 -6.00 -90.00
8767.15 90.43 177.44 4326.45 5306.67 -300.51 16.00 -0.14 -16.00 -89.86
9583.20 90.43 177.44 4320.31 4491.45 -264.12 0.00 0.00 0.00 0.00
9700.09 89.38 182.00 4320.50 4374.60 -263.55 4.00 -0.90 3.90 102.99 MPS-19 (S)OA T2
9713.78 89.38 182.55 4320.65 4360.91 -264.09 4.00 0.01 4.00 89.91
10237.23 89.38 182.55 4326.30 3838.02 -287.36 0.00 0.00 0.00 0.00
10425.62 90.50 190.00 4326.50 3650.89 -307.93 4.00 0.59 3.96 81.48 MPS-19 (S)OA T3
10595.93 91.03 196.79 4324.22 3485.33 -347.36 4.00 0.31 3.99 85.50
11255.57 91.03 196.79 4312.37 2853.91 -537.91 0.00 0.00 0.00 0.00
11293.07 91.62 195.41 4311.50 2817.90 -548.30 4.00 1.57 -3.68 -66.82 MPS-19 (S)OA T4
11611.96 91.62 195.41 4302.50 2510.60 -633.02 0.00 0.00 0.00 0.00 MPS-19 (S)OA T5
Survey
MD Ind Azim TVD SysTVD M~pN MapE VS DLS TFO Tool/Comment
ft deg deg ft ft ft ft ft <:leg/100ft. ... .de9· .
7680.00 67.86 330.76 4291.67 4225.17 6005484.61 566249.56 5220.84 0.00 0.00 MWD+IFR+MS
7700.00 70.03 329.68 4298.86 4232.36 6005500.72 566240.14 5238.81 12.00 335.00 MWD+IFR+MS
7725.00 71.94 325.66 4307.00 4240.50 6005520.57 566227.33 5261.26 17.00 296.00 MWD+IFR+MS
7750.00 73.93 321.73 4314.34 4247.84 6005539.70 566213.01 5283.39 17.00 297.31 MWD+IFR+MS
7761.75 74.89 319.91 4317.50 4251.00 6005548.41 566205.79 5293.64 17.00 298.46 NF
7775.00 75.99 317.88 4320.83 4254.33 6005557.99 566197.27 5305.07 17.00 298.95 MWD+IFR+MS
7800.00 78.11 314.10 4326.44 4259.94 6005575.36 566180.19 5326.20 17.00 299.46 MWD+IFR+MS
7800.31 78.13 314.05 4326.50 4260.00 6005575.57 566179.97 5326.45 17.00 300.31 MPS-19 Hard3
7825.00 80.28 310.38 4331.13 4264.63 6005591.70 566161.87 5346.64 17.00 300.32 MWD+IFR+MS
7850.00 82.48 306.71 4334.87 4268.37 6005606.92 566142.41 5366.30 17.00 301.01 MWD+IFR+MS
7875.00 84.72 303.07 4337.66 4271.16 6005620.95 566121.91 5385.05 17.00 301.56 MWD+IFR+MS
7900.00 86.98 299.46 4339.47 4272.97 6005633.69 566100.49 5402.81 17.00 301.97 MWD+IFR+MS
7925.00 89.25 295.87 4340.29 4273.79 6005645.09 566078.27 5419.46 17.00 302.23 MWD+IFR+MS
7945.00 91.07 292.99 4340.24 4273.74 6005653.20 566059.99 5431.93 17.00 302.34 MWD+IFR+MS
7950.00 91.07 292.19 4340.14 4273.64 6005655.08 566055.36 5434.92 16.00 270.01 MWD+IFR+MS
7975.00 91.07 288.19 4339.68 4273.18 6005663.50 566031.83 5449.02 16.00 270.04 MWD+IFR+MS
8000.00 91.07 284.19 4339.21 4272.71 6005670.26 566007.78 5461.65 16.00 270.04 MWD+IFR+MS
8025.00 91.07 280.19 4338.74 4272.24 6005675.32 565983.31 5472.74 16.00 270.04 MWD+IFR+MS
8050.00 91.07 276.19 4338.28 4271.78 6005678.66 565958.54 5482.24 16.00 270.04 MWD+IFR+MS
8075.00 91.07 272.19 4337.81 4271.31 6005680.27 565933.61 5490.10 16.00 270.04 MWD+IFR+MS
8100.00 91.07 268.19 4337.34 4270.84 6005680.14 565908.62 5496.29 16.00 270.04 MWD+IFR+MS
8125.00 91.07 264.19 4336.88 4270.38 6005678.26 565883.70 5500.78 16.00 270.04 MWD+IFR+MS
8145.00 91.07 260.99 4336.50 4270.00 6005675.50 565863.90 5503.13 16.00 270.03 MWD+IFR+MS
8150.00 91.07 260.69 4336.41 4269.91 6005674.67 565858.97 5503.57 6.00 270.00 MWD+IFR+MS
8200.00 91.07 257.69 4335.47 4268.97 6005664.86 565809.96 5506.48 6.00 270.03 MWD+IFR+MS
8250.00 91.07 254.69 4334.54 4268.04 6005652.51 565761.53 5506.78 6.00 270.03 MWD+IFR+MS
8300.00 91.07 251.69 4333.61 4267.11 6005637.63 565713.81 5504.47 6.00 270.03 MWD+IFR+MS
8305.00 91.07 251.39 4333.51 4267.01 6005636.01 565709.09 5504.09 6.00 270.00 MWD+IFR+MS
8325.00 91.08 248.19 4333.14 4266.64 6005628.94 565690.39 5501.98 16.00 270.14 MWD+IFR+MS
8350.00 91.08 244.19 4332.67 4266.17 6005618.65 565667.61 5497.79 16.00 270.08 MWD+IFR+MS
8375.00 91.08 240.19 4332.20 4265.70 6005606.80 565645.62 5491.89 16.00 270.01 MWD+IFR+MS
8400.00 91.07 236.19 4331.73 4265.23 6005593.44 565624.50 5484.31 16.00 269.93 MWD+IFR+MS
8425.00 91.06 232.19 4331.27 4264.77 6005578.64 565604.36 5475.09 16.00 269.86 MWD+IFR+MS
8450.00 91.04 228.19 4330.81 4264.31 6005562.48 565585.31 5464.27 16.00 269.78 MWD+IFR+MS
8475.00 91.02 224.19 4330.36 4263.86 6005545.02 565567.43 5451.90 16.00 269.71 MWD+IFR+MS
8500.00 90.99 220.19 4329.92 4263.42 6005526.36 565550.81 5438.05 16.00 269.64 MWD+IFR+MS
) BP )
KW A Planning Report MAP
Company: BP Amqco Date:11118/200~ .... . Time: 11 :40:10 Page: 3
Fièld: Milne Point Co~rdinate(NE)Ref~..ence: , Well:. M,PS:-19, True North
Site: MPtS Pad V¢rti~al.(TVD)Refere~ce: ,. RB66.5066ß
Well: MPS~19 Section(VS}R~ference:' Well (0..00N,0.00E,345.85Azi)
Wellp~th: Plan MPS~19AL1 SurveyC~lcula~ionMethod.: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys 1;:VO MapN l\'IapE DLS TFO Tool/Comment
ft deg deg ft ft ft ft degltoOft· ·deg
8525.00 90.96 216.19 4329.50 4263.00 6005506.58 565535.54 5422.78 16.00 269.57 MWD+IFR+MS
8550.00 90.92 212.19 4329.09 4262.59 6005485.79 565521.68 5406.17 16.00 269.50 MWD+IFR+MS
8575.00 90.88 208.19 4328.70 4262.20 6005464.08 565509.30 5388.29 16.00 269.43 MWD+IFR+MS
8600.00 90.83 204.19 4328.33 4261.83 6005441.56 565498.47 5369.24 16.00 269.37 MWD+IFR+MS
8625.00 90.78 200.19 4327.97 4261.47 6005418.33 565489.24 5349.11 16.00 269.31 MWD+IFR+MS
8650.00 90.73 196.19 4327.64 4261.14 6005394.52 565481.65 5327.99 16.00 269.25 MWD+IFR+MS
8675.00 90.67 192.19 4327.34 4260.84 6005370.24 565475.74 5306.00 16.00 269.20 MWD+IFR+MS
8700.00 90.61 188.19 4327.06 4260.56 6005345.61 565471.54 5283.22 16.00 269.15 MWD+IFR+MS
8725.00 90.54 184.19 4326.81 4260.31 6005320.74 565469.06 5259.79 16.00 269.11 MWD+IFR+MS
8750.00 90.48 180.19 4326.59 4260.09 6005295.76 565468.33 5235.80 16.00 269.07 MWD+IFR+MS
8767.15 90.43 177.44 4326.45 4259.95 6005278.62 565468.83 5219.09 16.00 269.03 MWD+IFR+MS
8800.00 90.43 177.44 4326.20 4259.70 6005245.82 565470.59 5186.91 0.00 0.00 MWD+IFR+MS
8900.00 90.43 177.44 4325.45 4258.95 6005145.97 565475.93 5088.96 0.00 0.00 MWD+IFR+MS
9000.00 90.43 177 .44 4324.70 4258.20 6005046.13 565481.26 4991.00 0.00 0.00 MWD+IFR+MS
9100.00 90.43 177 .44 4323.94 4257.44 6004946.28 565486.60 4893.05 0.00 0.00 MWD+IFR+MS
9200.00 90.43 177 .44 4323.19 4256.69 6004846.44 565491.94 4795.09 0.00 0.00 MWD+IFR+MS
9300.00 90.43 177.44 4322.44 4255.94 6004746.59 565497.28 4697.13 0.00 0.00 MWD+IFR+MS
9400.00 90.43 177.44 4321.69 4255.19 6004646.75 565502.62 4599.18 0.00 0.00 MWD+IFR+MS
9500.00 90.43 177 .44 4320.93 4254.43 6004546.90 565507.96 4501.22 0.00 0.00 MWD+IFR+MS
9583.20 90.43 177.44 4320.31 4253.81 6004463.84 565512.40 4419.72 0.00 0.00 MWD+IFR+MS
9600.00 90.28 178.10 4320.20 4253.70 6004447.05 565513.20 4403.28 4.00 102.99 MWD+IFR+MS
9700.09 89.38 182.00 4320.50 4254.00 6004347.00 565514.00 4306.27 4.00 103.00 MPS-19 (S)OA T2
9713.78 89.38 182.55 4320.65 4254.15 6004333.31 565513.58 4293.14 4.00 89.91 MWD+IFR+MS
9800.00 89.38 182.55 4321.58 4255.08 6004247.17 565510.50 4210.56 0.00 0.00 MWD+IFR+MS
9900.00 89.38 182.55 4322.66 4256.16 6004147.24 565506.94 4114.79 0.00 0.00 MWD+IFR+MS
10000.00 89.38 182.55 4323.74 4257.24 6004047.32 565503.37 4019.01 0.00 0.00 MWD+IFR+MS
10100.00 89.38 182.55 4324.82 4258.32 6003947.40 565499.81 3923.23 0.00 0.00 MWD+IFR+MS
10200.00 89.38 182.55 4325.90 4259.40 6003847.48 565496.25 3827.46 0.00 0.00 MWD+IFR+MS
10237.23 89.38 182.55 4326.30 4259.80 6003810.28 565494.92 3791.80 0.00 0.00 MWD+IFR+MS
10300.00 89.75 185.03 4326.78 4260.28 6003747.63 565491.32 3732.09 4.00 81 .48 MWD+IFR+MS
10400.00 90.35 188.99 4326.69 4260.19 6003648.30 565480.00 3638.85 4.00 81.46 MWD+IFR+MS
10425.62 90.50 190.00 4326.50 4260.00 6003623.00 565476.00 3615.38 4.00 81.46 MPS-19 (S)OA T3
10500.00 90.73 192.97 4325.70 4259.20 6003550.00 565461.84 3548.33 4.00 85.50 MWD+IFR+MS
10595.93 91.03 196.79 4324.22 4257.72 6003457.11 565438.03 3464.48 4.00 85.53 MWD+IFR+MS
10600.00 91.03 196.79 4324.15 4257.65 6003453.20 565436.89 3460.99 0.00 0.00 MWD+IFR+MS
10700.00 91.03 196.79 4322.35 4255.85 6003357.24 565408.85 3375.24 0.00 0.00 MWD+IFR+MS
10800.00 91.03 196.79 4320.56 4254.06 6003261.28 565380.81 3289.48 0.00 0.00 MWD+IFR+MS
10900.00 91.03 196.79 4318.76 4252.26 6003165.32 565352.77 3203.73 0.00 0.00 MWD+IFR+MS
11000.00 91.03 196.79 4316.96 4250.46 6003069.35 565324.74 3117.98 0.00 0.00 MWD+IFR+MS
11100.00 91.03 196.79 4315.16 4248.66 6002973.39 565296.70 3032.22 0.00 0.00 MWD+IFR+MS
11200.00 91.03 196.79 4313.37 4246.87 6002877 .43 565268.66 2946.47 0.00 0.00 MWD+IFR+MS
11255.57 91.03 196.79 4312.37 4245.87 6002824.10 565253.08 2898.81 0.00 0.00 MWD+IFR+MS
11293.07 91.62 195.41 4311.50 4245.00 6002788.00 565243.00 2866.44 4.00 293.18 MPS-19 (S)OA T4
11300.00 91.62 195.41 4311.30 4244.80 6002781.31 565241.22 2860.41 0.00 0.00 MWD+IFR+MS
11400.00 91.62 195.41 4308.48 4241.98 6002684.72 565215.50 2773.4 7 0.00 0.00 MWD+IFR+MS
11500.00 91.62 195.41 4305.65 4239.15 6002588.13 565189.79 2686.52 0.00 0.00 MWD+IFR+MS
11600.00 91.62 195.41 4302.82 4236.32 6002491.55 565164.07 2599.57 0.00 0.00 MWD+IFR+MS
11611.96 91.62 195.41 4302.50 4236.00 6002480.00 565161.00 2589.18 0.00 0.00 MPS-19 (S)OA T5
)
)
Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit
to Drill sub section 14 (e) if a well has multiple well branches, each branch requires
a separate Permit to Drill. If multiple well branches are proposed from a single.
conductor, surface or production casing, the applicant shall designate one branch as
the primary Wellbore and include all information required under (c) of this section
that is unique to that branch and need not include the $100 fee.
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
CHECK WHAT
APPLIES
~
Rev: 07/10/02
C\jody\templates
WELL NAME #/¿,., /I1/.ç -/7';:; L. )
PTD# .2ð.2- - 2..3 7'
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
"CLUE"
The permit is for a new wellbore segment of
existing well.1! JII.-P-?t /'1;ØJ" / l' A
Permit No, 2ð~ ...2.J3API No. S"ð "ð~ -J-.z..l 1.2.1" 0/
Production should continue to be reported as
a function of the original API number stated
above.
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
DRY DITCH
SAMPLE
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST' COMPANY liP)!. WELL NAMEI"1/U ,4{}1( -/1..AL/PROGRAM: Exp _ Dev,.6 Redrll_ Re-Enter _ Serv _ Well bore seg'A-
FIELD & POOL S' 2$ I <¡ ð INIT CLASS /),. /./ / - ðl 'I GEOL AREA 91,..-\ UNIT# I) . ~ 2 ~ ON/OFF SHORE ~
ADMINISTRATION 1. Permit fee attached. .................. 10 N
2. Lease number appropriate. . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. W ell located proper distance from drilling unit boundary. . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . ; ; . . Y N
I.... ) _ /. 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
!tL- ~ð2- 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . 'tJ N
(Service Well Only) 13. Well located wlin area & strata authorized by injection order#_ Y JÝ.. N N.J/}.
(Service Well Only) 14. All wells wlin ~ mile area of review identified. . . . . . .. Y N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . -¥--N-
16. Surface casing protects all known USDWs. . . . . . . ¥-N-
17. CMT vol adequate to circulate on conductor & surf csg. . . . ~tJ/ A.-
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . -¥--N- ,I.
19. CMT will cover all known productive horizons. . . . . . . . . . ~Y. NN sit? 'I-(-Û:Î
20. Casing designs adequate for C, T, B & permafrost. . . . . ., ,::j.::-[[N i\~~ Ao_
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . ..J vy_ I 4 .
22. If a re-drill, has a 10-403 for abandonment been approved. . .
23. Adequate well bore separation proposed.. . . . . . . . . . . . _ N
24. If diverter required, does it meet regulations. . · . . . . . . . J. , Ailk- (Þ. J
25, Drilling fluid program schematic & equip list adequate. . . '. . .'''' N~N .}1.\.A1L }11 VJ ï I '- flPC1.
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . .
APPR DATE 27. BOPE press rating appropriate; test to {¡ODD psig.
J ?' I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . .
tdCÅ- t2.. L.?f01.- 29. Work will occur without operation shutdown. .. . . . . . . . . ' .ÞI-~
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y Œ:!
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . Y N N'/It--
GEOLOGY (j) N
APPR DATE }{;u
Á'/¿ 12./'/02- Y. . NN . A I
(Exploratory Only)
APPR
DATE
32. Permit can be issued w/o hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . . . . .. ......
36. Contact namelphone for weekly progress reports. ......
.(
GEOLOGY:' PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER
RPC!f£ TEM JDH JBR
/' MJW
SFD WGA
Rev: 10/15/02 -
COMMISSIONER:
COT /~3!d~
DTS , 2.-} <. '*3/0 e.
MLB ~¿';d' /2./2,)/., t..
Commentsllnstructions:
G:\geology\permits\checklist.doc
)
')
Welll--1istory File
APPENDIX
Infornìation of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding infomlation, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
)
')
dœ-d3'i
1/5/3
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Feb 18 10:26:07 2003
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD / MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-19A L1
500292312160
BP Exploration, Alaska
Sperry-Sun Drilling Services
18-FEB-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 5
AKMW30008
T. MCGUIRE
C. DIXON
MWDRUN 6
AKMW30008
T. MCGUIRE
C. DIXON
MWDRUN 7
AKMW30008
T. MCGUIRE
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3308
195
72.20
33.70
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.125 7.000 7703.0
)
)
3 RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 5 COMPRISED DIRECTIONAL WITH DGR. THE
PURPOSE OF THIS RUN WAS
TO ORIENT THE WHIPSTOCK WITHIN THE MPS-19A WELLBORE.
THE TOP OF THE
WHIPSTOCK WAS POSITIONED AT 7691'MD AND THE BOTTOM
WAS AT 7703'MD.
4. MWD RUNS 6 & 7 COMPRISED DIRECTIONAL WITH DGR¡
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4) ¡ AND AT-BIT INCLINATION
( AB I) .
5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 2/11/03. MWD DATA
ARE CONSIDERED
PDC.
6. MWD RUNS 5 - 7 REPRESENT WELL MPS-19A Ll WITH API#:
50-029-23121-60.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
11630'MD/4264'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
1
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
7658.5
STOP DEPTH
11575.5
) )
ROP 7690.0 11630.5
FET 7691.5 11583.5
RPD 7691.5 11583.5
RPM 7691.5 11583.5
RPS 7691.5 11583.5
RPX 7691.5 11583.5
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
5
6
7
MERGE TOP
7658.0
7711.0
8732.0
MERGE BASE
7711.0
8732.0
11630.5
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7658.5 11630.5 9644.5 7945 7658.5 11630.5
ROP MWD FT/H 0.11 1697.98 171.75 7882 7690 11630.5
GR MWD API 37.93 134.15 80.2284 7835 7658.5 11575.5
RPX MWD OHMM 0.36 2000 33.1856 7785 7691.5 11583.5
RPS MWD OHMM 0.6 2000 36.2169 7785 7691.5 11583.5
RPM MWD OHMM 2.12 2000 39.9776 7785 7691.5 11583.5
RPD MWD OHMM 5.64 2000 38.7308 7785 7691.5 11583.5
FET MWD HOUR 0.19 26.87 0.939922 7785 7691.5 11583.5
First Reading For Entire File......... .7658.5
Last Reading For Entire File.......... .11630.5
File Trailer
)
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
2
)
header data for each bit run in separate files.
5
.5000
START DEPTH
7690.0
STOP DEPTH
7711.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
24-JAN-03
Insite
66.37
Memory
7711.0
7658.0
7711.0
.0
.0
TOOL NUMBER
65041
6.125
7703.0
Water Based
9.20
60.0
9.0
27000
3.2
)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.260
.250
.300
.480
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD050
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD050 FT/H
Min
7690
0.11
Max
7711
23.85
Mean
7700.5
7.36442
Nsam
43
43
First Reading For Entire File......... .7690
Last Reading For Entire File.......... .7711
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name..... ..STSLIB.002
)
72.0
75.1
72.0
72.0
First
Reading
7690
7690
Last
Reading
7711
7711
)
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPX
RPS
ROP
$
3
.\\
header data for each bit run in separate files.
6
.5000
START DEPTH
7658.5
7691.5
7691.5
7691.5
7691.5
7691.5
7711.5
STOP DEPTH
8677.0
8684.0
8684.0
8684.0
8684.0
8684.0
8732.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
26-JAN-03
Insite
66.37
Memory
8731.0
7711.0
8731.0
83.0
93.8
TOOL NUMBER
65041
148574
6.125
7703.0
Water Based
9.20
64.0
9.0
28000
64.0
.180
.150
.240
.310
68.0
84.3
68.0
68.0
)
)
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point..... ........ . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7658.5 8732 8195.25 2148 7658.5 8732
ROP MWD060 FT/H 3.89 522.05 148.575 2042 7711.5 8732
GR MWD060 API 37.93 134.15 86.9378 2038 7658.5 8677
RPX MWD060 OHMM 0.36 1628.4 21.1248 1986 7691.5 8684
RPS MWD060 OHMM 0.6 1628.43 21.8113 1986 7691.5 8684
RPM MWD060 OHMM 2.12 2000 35.6296 1986 7691.5 8684
RPD MWD060 OHMM 5.64 2000 36.7331 1986 7691.5 8684
FET MWD060 HOUR 0.19 26.87 1.16881 1986 7691.5 8684
First Reading For Entire File......... .7658.5
Last Reading For Entire File.......... .8732
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.003
)
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
4
)
header data for each bit run in separate files.
7
.5000
START DEPTH
8677.5
8684.5
8684.5
8684.5
8684.5
8684.5
8732.5
STOP DEPTH
11575.5
11583.5
11583.5
11583.5
11583.5
11583.5
11630.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
28-JAN-03
Insite
66.37
Memory
11630.0
8731.0
11630.0
84.1
99.4
TOOL NUMBER
65041
148574
6.125
7703.0
Water Based
9.30
59.0
9.0
34000
4.0
.180
.130
.240
.310
68.0
98.1
68.0
68.0
)
')
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8677.5 11630.5 10154 5907 8677.5 11630.5
ROP MWD070 FT/H 0.29 1697.98 181.132 5797 8732.5 11630.5
GR MWD070 API 52.3 126.12 77.8697 5797 8677.5 11575.5
RPX MWD070 OHMM 8.12 2000 37.3161 5799 8684.5 11583.5
RPS MWD070 OHMM 9.15 2000 41.1505 5799 8684.5 11583.5
RPM MWD070 OHMM 9.47 2000 41.4666 5799 8684.5 11583.5
RPD MWD070 OHMM 6.94 2000 39.4149 5799 8684.5 11583.5
FET MWD070 HOUR 0.19 11.65 0.861533 5799 8684.5 11583.5
First Reading For Entire File......... .8677.5
Last Reading For Entire File.......... .11630.5
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/02/18
Maximum Physical Record. .65535
File Type............ . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03 1 02 1 18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
)
')
Service name. . . . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03 /02 / 18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............ ....UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File