STATE OF ALASKA
ALASK~IL AND GAS CONSERVATION CO~SION
~~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
/~9
1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended
zoAAC zs.,os zoAAC zs.,,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero ~~a~(~~ t?~;a#
""°~'1~~'' o e'11C `'~'~C f~
^ Servic~O~Of~I~ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
12/15/2008 12. Permit to Drill Number
202-258 308-433
3. Address:
P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Date Spudded
01/23/2003 13. API Number
50-029-20691-02-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
01/25/2003 14. Well Name and Number:
PBU 15-15B
2467
FNL, 1546
FWL, SEC. 22, T11 N, R14E, UM
Top of Productive Horizon:
2126' FNL, 372T FWL, SEC. 27, T11 N, R14E, UM g KB (ft above MSL): 57.48'
Ground (ft MSL): 29.29' 15. Field /Pool(s):
Prudhoe Ba Field / Prudhoe Ba
Y Y
Total Depth:
2474' FNL, 1968' FWL, SEC. 27, T11N, R14E, UM 9. Plug Back Depth (MD+TVD)
13017' 8965' Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 677510 y- 5959051 Zone- ASP4 10. Total Depth (MD+TVD)
13050' 8965' 16. Property Designation:
ADL 028309
TPI: x- 679816 y_ 5954166 Zone- ASP4
Total Depth: x- 678066
- 5953776 Zone- ASP4 11. SSSV Depth (MD+TVD)
N/A 17. Land Use Permit:
y
18. Directional Survey ^ Yes ®No
Su i t ni n 'nf rm i r 2 AA 2. 5 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (11/D):
1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD, GR, ROP, RES, CNL, CCL
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SRE CEMENTING RECORD PULLED
" H a P II
„ ~ „
/ " 47# L-80 / S0095 rf 1 rf 1 -1/4" I '
7" 9# 1' 1 7' 8-1 4 x a'
4-1 1 1 '
~-,rr~ X ~-az,s° x zaia° s.a~e i s.za i s.,s# 109 1 8 5' - /4" 13 I '
23. Open to production or inject ion? ^ Yes ®No 24. TuewG RECORD
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Size and Number): SIZE DEPTH .SET MD PACKER .SET MD
5-1/2", 17#, 13Cr 9647' 9642'
MD TVD MD TVD '4-1/2", 12.6#. 13Cr 9647' - 9701'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. `
rrss
I;ij`,;
~' ~ J.~ ~~
-
~
~ DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
,
~ ~_ i
.
'-' a,f~s' ~+
~
'G6_ CF 10815' Set CIBP
10763' Set Whipstock
26. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date Of Test: HOUrS Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
PreSS. CaSing PreSS: CALCULATED
24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac wired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
„ .S t
t
None ... ~ ~~ .i~~i ~ ~ ~QO~ ~i?/S=0
~ ~
~~~ .. .+mwr.,,..:..
Form 10-407 Revised 02/2007 CONTIN~IE~ ~'Is~ ~ n
E ~ `~ i ( (,~~y
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS
NAME TVD Well Tests Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Sadlerochit /Zone 1 A 11156' 8922' None
Formation at Total Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
31. I hereby certify that the foregoing is true and correct to the best of my knowledge. l
~ j
Si ned
` ~3/
9 Terris Hubble Title Drilling Technologist Date
PBU 15-15B 202-258 308-433 Prepared By Name/Number. Terris Hubble, 564-4628
Well Number Permit No. / A rOVal NO. Drilling Engineer: Mel Rixse, 5645620
INSTRUCTIONS
GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITeM 4b: TPI (Top of Producing Interval).
ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
•
15-15B, Well History (Pre Rig Sidetrack)
Date Summary
10/29/2008 WELL S/I ON ARRIVAL. SET 5 1/2 WHIDDON C-SUB C«~ 9640' SLM. U-TUBE FROM TBG TO IA.
10/30/2008 T/I/0=2330/2330/50 Temp= SI MITIA PASSED to 3000 psi, MITOA FAILED to 2000 gsi (CTD
Screen). Pumped down IA with 515 bbls 90°F crude to load. slickline set DGLV. Pressured up IA with
7.3 bbls cude to 3000 psi. IA lost 120 psi in 1st 15 min and 60 psi in 2nd 15 min, ran test out an
additional 15 min for thermal stability. IA lost 20 psi in 3rd 15 min for total loss of 200 psi in 45 min. Bled
back 7.5 bbls from IA. RD from IA and RU to OA. Pressured up OA to 2000 psi with 7 bbls crude.
MITOA failed three attempts.. Bled back 4 bbls from OA. FWHP's =SSV/80/60 Valve positions at
departure: Wing, Swab and SSV closed. Master open and Annular valves open to gauges.
10/30/2008 PULLED T2-OGLV FROM STA #3 C~ 9572' MD. PULLED T2-LGLV FROM STA #2 @ 7253' MD, STA #1
@ 3910' MD. SET T2-DGLV IN STA #1 (3908' SLM), #2 (7256' SLM), #3 (9575' SLM). LRS LOADED IA
W/ --500 BBLS OF CRUDE. LRS MIT-IA (PASS) . LEFT WELL S/I, NOTIFY DSO.
12/5/2008 WELL S/I ON ARRIVAL. DRIFTED W/ 4 1/2" GR 20'x 3.70 DUMMY WHIPSTOCK S/D 10 646' SLM.
DRIFTED W/ 3.50" CENT, 8'x 2.25" DRIVE DOWN BAILER TO 10,950' SLM (EMPTY). RAN 3.805"
GAUGE RING, 4 1/2" BRUSH TO 10,950' SLM, (SMALL AMOUNY OF PARAFIN ON TOP OF GAUGE
RING).
12/6/2008 T/I/0=1900/0/50 Assist slickline w/brush & flush (Pre CTD). Spear in w/3 bbls meth followed by 242 bbls
of crude while slickline RIH w/brush. FWHP's=600/150/750 Annulus valves left open to gauges, dso
notified C~ dep.
12/6/2008 DRIFT 3x's W/ 4 1/2" GR, 20'x 3.70" DUMMY WHIPSTOCK, WORK FROM 10646' TO 10703' SLM.
DRIFT W/ 3.80 CENT, 4 1/2" BRUSH (STIFF), TO 10836' SLM. LRS BRUSH & FLUSH W/ HOT DIESEL
& 4 1/2" BRUSH TO 10968' SLM. DRIFT W/ 2' x 2 5/8" STEM, 3.70" CENT TO 11000' SLM.
IN HOLE W/ 3.80" CENT, 4 1/2" BRUSH.
12/7/2008 T/I/0=0/0/0, Temp=Sl. Repair leaking LDS/gland nuts.
SL on well. Found 2 leaking gland nuts on tubing spool. Stung into TBG hanger test void, bled to 0 psi.
Adjusted gland nuts. Leaks mitigated.
12/7/2008 DRIFT W/ 3.80" CENT & 4 1/2" BRUSH TO 10950' SLM. DRIFT W/ 4 1/2" GR, 10'x 3.70" DMY
WHIPSTOCK WORK TO 10732' SLM. DRIFT W/ 3.80" CENT, 4'x 4 1/2" BRUSH, 3.80" CENT TO
10920' SLM. MADE 1 DRIFT W/ 20' x 3.70" DMY WHIPSTOCK TO 10662' SLM & 1 DRIFT W/ 10' x
3.70" DMY WHIPSTOCK TO 10668' SLM. UNABLE TO MAKE DUMMY WHIPSTOCK DRIFT TO
TARGET DEPTH OF 10.900; WELL LEFT S/I ON DEPARTURE DSO INSPECTED ALL VALVES
BEFORE DEPARTURE.
12/8/2008 MIRU & STBY. MU Drift BHA, load well and RIH.
12/8/2008 MIRU CTU. MU BHA #1: Baker Gen II Dummy Whipstock, Load well with 225 bbls of 1 % KCI with 0.6%
SafeLube and 46 bbl 60/40 meth cap. RIH and drift to 10950' ctmd. POOH. Changeout tools.
12/9/2008 MU and RIH with BHA #2: PDS GR/CCL in carrier. Log from 10925' to 9600' ctmd at 50 fpm. POOH.
OOH with good data correct depth -20' ((Tied in to PDS Coil Flag dated 17-Jan-2003 per procedure).. MU
CIBP and RIH. Correct to EOP at flag depth and RIH to 10,815' to set CIBP. Pumped 5/8" steel ball and
ball never landed on seat. Launched 2nd ball and confirmed it went over gooseneck. Tried stacking WT
again and CIBP was set. PU and PT to 1500psi, good test POOH. 310' fluid pack well and perform MIT-
T. MIT Passed, tag up and weather is to severe to rig down. Secure well with night cap.
MIT-T Info
Initial T/I/O = 1092/-3/13, temp = SI. MIT-T PASSED to 1087psi. Pressured tubing to 1092psi with 49
bbls of 60/40 Methanol. MIT-T lost 10psi in 1st 15 minutes and gained 5psi in 2nd 15 minutes for a total
of 5psi lost during 30 minute test. Bled tubing to 0 psi. Final WHPs = 0/0/13.
Page 1 of 2
•
15-15B, Well History (Pre Rig Sidetrack)
Date Summary
12/9/2008 MU and RIH with BHA #2: PDS GR/CCL in carrier. Log from 10925' to 9600' ctmd at 50 fpm. POOH.
Rig down CTU. Job Complete.
12/11/2008 T/I/0=0Nac/55. Temp=Sl. Bleed WHPs to 0 psi for CTD prep. No AL. OA FL near surface. Bled OAP
from 55 psi to 0 psi in 45 min (gaseous fluid). Monitor 30 min. OA increased 5 psi. Final
WHPs=ONac/5. SV, WV =Closed. SSV, MV =Open. IA&OA = OTG. NOVP.
12/11/2008 T/IA/OA 0/0/40 Temp=cold PPPOT-T (PASS) (CTD)
PPPOT-T RU 2 HP BT onto THA 50 psi to 0 psi, flush void until clean returns achieved. Pressured to
5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bleed void to 0 psi, RD test
equipment, re installed Alemite caps. Cycle and torque LDS "Standard" (3) LDS are not accessible due
to hydraulic panel mounted on THA all others in good working and visual condition.
12/13/2008 Pressure test tree valves to 4000psi and service tree with Clare 501 grease pre CTD. ALL valves tested
good.
Page 2 of 2
BP EXPLORATION Page 1 of 20
Operations Summary' Report
Legal Well Name: 15-15
Common Well Name: 15-15 Spud Date: 12/22/1981
Event Name: REENTER+COMPLETE Start: 12/3/2008 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
12/13/2008 08:30 - 21:30 13.00 MOB P PRE Move rig from C pad over to DS 15
21:30 - 21:45 0.25 MOB P PRE PJSM for moving rig over well
21:45 - 22:00 0.25 MOB P PRE Move rig over well
22:00 - 00:00 2.00 BOPSU P PRE Ri Acce t ~ 22:00 HRS 12/13/2008.
NU BOPE.
12/14/2008 00:00 - 04:00 4.00 BOPSU P PRE Add 2' extension, and NU BOPS, grease BOP's with Clare
grease.
04:00 - 10:00 6.00 BOPSU P PRE Pressure Test BOPE. 250-3500 psi. Chart tests. Send test
report to AOGCC.
AOGCC rep Chuck Shieve waived witnessing BOP test
10:00 - 12:00 2.00 WHIP N RREP WEXIT Replace parts in SCR's. Test SCR's. Still not working at
100%.
12:00 - 14:15 2.25 WHIP P WEXIT Fill coil with 2# Biozan. Reverse circ 30 bbl rig water into coil.
Reverse circ at 4.0 bpm, 2400 psi, 3 times to pump slack back
into coil.
Cut off 145' of coil. 14,582' left on this reel.
14:15 - 17:00 2.75 WHIP P WEXIT M/U SWS CTC. Pull test w/ 40K.
M/U BHI UOC and check E-line.
Press test inner reel valve and CTC and BHI UOC.
Open swab and master valves.
17:00 - 18:00 1.00 WHIP P WEXIT M/U Baker 4-112" Whipstock and CoilTrak tools.
BHA OAL = 79.18'. Test tools at surface.
18:00 - 18:30 0.50 WHIP N RREP WEXIT Work on SCR's again. Wait at surface before RIH with tools.
Well is dead.
f8:30 - 19:00 0.50 WHIP N WEXIT RIH with BOT 4-1/2" Mono-bore Whi stock on CoilTrak, BHA
#1.
19:00 - 19:15 0.25 WHIP N WEXIT Baker tools not working at 500', POOH
19:15 - 19:30 0.25 WHIP N WEXIT LD WS setting BHA, eline pulled out of anchor
19:30 - 21:15 1.75 WHIP N WEXIT Boot coil, Pump slack management again, reverse-circ at 5.0
bpm, 3800 psi, 3 times to pump slack back into coil.
Cut off 280', 14,302' left on reel
21:15 - 00:00 2.75 WHIP N WEXIT MU SWS CTC, Pull test w/ 40k
MU BHI UOC and check eline
PT CTC and BHI UOC
12/15/2008 00:00 - 01:30 1.50 WHIP N WEXIT Pump forward ~ 2 bpm over the bunghole
PU WS setting BHA
01:30 - 04:30 3.00 WHIP P WEXIT RIH w/ WS settin BHA, GR tie-in, check up weight - 40K,
continue RIH to WS setting depth
04:30 - 04:45 0.25 WHIP P WEXIT Orient WS to 90 ROHS, Bring pumps on and pressure up to
3800 psi, set WS, check up weight 39.5K, good set
04:45 - 07:15 2.50 WHIP P WEXIT POOH
07:15 - 07:30 0.25 WHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for laying out running tools and M/U mill, motor, 2 jts
PH6 and CoilTrak tools.
07:30 - 08:40 1.17 STWHIP P WEXIT Lay out whipstock running tools.
M/U 3.80" window milling BHA #2 with HCC 3.80" diamond
window mill, 3.80" string reamer, motor, 2Jts PH6 and CoilTrak
tools.
BHA OAL = 120.72'.
~ 08:40 - 10:45 2.08 STWHIP P WEXIT RIH with 3.80" window milling BHA #2, RIH at 100 fpm, circ at
S~SG 0.2 bpm. Slick Biozan.
rnniea: v°rcwa ~ is i°.cv raw
TREE _ 5-1 /8" FMC
ELLHEAD = FMC
ACTUATOR
KB. ELEV = AXELSON
59.5'
_ _
BF. ELEV =
39.8'
KOP = 2900'
Max Angle = 94° @ 11268'
Datum MD = 10867'
Datum TV D = 8800' SS
I20" CONDUCTOR, 94#, H-40, ID = 19.124" ~ 110'
13-3/8" CSG, 72#, L-80 BTC, ID = 12.347" 2558'
9-5/8" CSG, 47#, L-80 BTC XO TO S0095 BTC 9138'
Minimum ID = 2.441" @ 11370'
2-7/8" STL PIN CONNECTION
5-1/2" TBG, 17#, 13CR NSCC, 964T
.0232 bpf, ID = 4.892"
2223' 1~5-1/2" CAMCO BAL-O SSSV NIP, ID = 4.562"
GAS I IFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
3 3910 3811 38 LB DMY T2 0 10/30f08
2 7253 6131 48 LB DMY T2 0 10/30108
1 9572 7861 38 LB DMY T2 0 10!34108
9642' ~ 9-5/8" X 5-1 /2" BKR S-3 PKR, ID = 5.750"
9647' S-1/2" X 4-1/2" XO, ID = 3.938"
9678' 4-1/2" HES X NIP, ID = 3.813"
96$9' ~ 9-5/8" X 7" BKR ZXP PKR, ID = 6.313"
9701' 9-5/8" X 7" UNIQUE WLEG, ID = 3.958"
4-1/2" TBG, 12.6#, 13CR NSCT, 9701'
9702' 9-5/8" X 7" BKR HMC LNR HGR, ID = 6.313"
.0152 bpf, ID = 3.958"
9709' 7" X 4-1/2" XO, ID = 3.938"
9831' -i 7" BOT TIEBACK SLV, ID = ?
9841' 9-5/8" X 7" BOT LNR HGR
9-5/8" CSG, 47#, S0095 BTC, ID = 8.681" I~ 10129'
10260' I~ 7" DOUBLE MARKER JOINT I
10348' 3.70" KB PKR, ID = 2.380"
10365' 3.70" BKR DEPLOY SLV, ID = 3.00"
7" LNR, 29#, L-80 BTC, .0371 bpf, ID = 6.184" -~
3-1/2" LNR, 8.81#, L-80 STL, .0087 bpf, ID = 2.992" 10416'
4-1/2" LNR, 12.6#, L-80 IBT, .0152 bpf, ID = 3.958" 105$0"
4-1/2" BKR 45 MONOBORE WHIPSTOCK 10763'
4-1/2" CIBP 10815'
PERFORATION SUMMARY
REF LOG: MCNL ON 01/02/09
ANGLE AT TOP PERF: 89° @ 11430'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
2" 6 11430 - 11530 O 01 /02/09
2" 6 11600 - 11690 O 01 /02/09
2" 6 11740 - 11910 O 01 /02/09
2" 6 11980 - 12500 O 01 /02/09
10416' -~ 3-1/2" X 3-3/16" XO, ID = 2.786"
~MILLOUT WINDOW (15-15C) 10587' - 10609'
3-3/16" X 2-7/8" XO, ID = 2.441"
12610' PBTD
3-3/16" LNR, 6.2#, L-80 TCII, 11600'
.0076 bpf, ID = 2.80"
2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" 12658'
DATE REV BY COMMENTS DATE REV BY COMMENTS
01/13/82 PKR176 ORIGINALCOMPLETION
12/26/98 D16 SIDETRACK (15-15A)
01/24/03 NORDIC 1 CTDSIDETRACK(15-156)
01/03/09 NORDIC 1 CTDSIDETRACK(15-15C)
01/11/09 ?/ PJC DRLG DRAFT CORRECTIONS
PRUDHOE BAY UNIT
WELL: 15-15C
PERMIT No: 2081820
API No: 50-029-20691-03
SEC 22, T11 N, R14E, 2467' SNL & 1546' EWL
BP Exploration (Alaska)
S NOTES: WELL ANGLE > 70° @ 10962' *"'"
15 -15 C MI~LLOUT W NDOW oR CHROME TBG N BELOW
F
~ ~
WELL LOG
TRAMSM/TTAL
•~, ,;
ProActive Diagnostic Services, Inc.
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
RE : Cased Hole/Open Hole/Mechanical Lags and/or Tubing Inspection(Caliper/ MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
BP Exploration (Alaska), Inc.
Petrotechnical Data Center
Attn: Joe Lastufka
LR2-1
900 Benson Btvd.
Anchorage, Alaska 99508
and
ProActive Diagnostic Services, Inc. P, q~
Attn: Robert A. Richey ` ~; ~ ~`~', ~~ ~ °' `~`~`'
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax: (907) 245.8952
1) Coil Flag 09-Dec-08 15-156
ea--~' ,-
Signed : °~
Print Name:
~ _•:
,.fit
EDE 50-029-20691-02
~.~z-~ -
Date
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 Vd. INTERNATIONAL AIRPORT RD SURE C, ANCHORAGE, AK 99518
PHONE: (907245-8951 FAX: (907)245-88952
E-MAIL :~ci~amc;horar~~~ ~rtern~r~icas~.ce~rn wEBSITE : www~ria~rt~aeFrv~ic~r:.r„„asrr~
C:iDocumen~ and Settingsl0wnerlDesktoplTransinit_BP.docx
•
AI.ASSA OIi. A1~D G~5
C01~5ERV.ATIOAT COl-il-II55IOrIT
John McMullen
SARAH PAtIN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Engineering Team header
BP Exploration Alaska Inc.
PO Box 196612 ~~~ 1F;~a, ~~ ` ~~~
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-15B
Sundry Number: 308-433
Dear Mr. McMullen:
afi b/
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Coxnmission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
J Chair
h ~G
DATED this 2 day of December, 2008
Encl.
O ~ STATE OF ALASKA '
Vt ' ' AL~ OIL AND GAS CONSERVATION COM~ION ~a ~~~
(ti ~~ APPLICATION FOR SUNDRY APPROVAL --`ail
20 AAC 25.280
1. Type of Request: ®Abandon / ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension `
~J
ti
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ~+`
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ~ 1%
2. Operator Name: 4. Current Well Class; 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development~ ^ Exploratory 20Z-2S8 -
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 198612, Anchorage, Alaska 99519-6612 SO-048-20691-02-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU 13-15B -
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): t~~
ADL 028309 ~ 57.48'. Prudhoe Bay Field / Prudhoe Bay Pool
12• PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): .Junk (measured):
13050 ~ 8965 ~ 13017_ 8965 - None None
n M r
rl
"
rf 1 / " ,
In rm i 1 / " 1 '
•n 7 1' - 1 '
1 7 ' 41 '-11 '- 1 '
3-1/2" x 3-3/16" x 2-7/8" '
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
11305' - 13010' 8934' - 8965' S-1/2", 17# x 41/2", 12.6# 13Cr 9701'
Packers and SSSV Type: 9-5/8" x5-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 9642'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: January 15, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned
17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mel Rase, 5645820
Printed Name John Mullen Title En insari Team Leader
Prepared By NameMumber:
Signature Phone 564-4711 Date 1 I Z-G ~ Terrie Hubble, 5644628
Commission Use On
Sundry Number: „ .C~/3
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity OP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: ~ ~ ~ ~ Q5 ` ~3~ `~ ~-~ !7 ~_
Subsequent Form wired: ~-t,l~
APPROVED BY ~ ~ o Z I
A roved B : COMMISSIONER THE COMMISSION Date V
Form 10-403 Reid 06/2006
ORIGINAL
Submit In Duplicate
;~~ ~ ~. r;~~ ~~ ~ ~ ?t~Oti
•
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Mel Rixse
CTD Engineer
Date: November 18, 2008
Re: PBU 15-156 Perforation Abandonment Request prior to Coiled Tubing Drilling Sidetrack
Sundry approval is requested for 15-156. Isolation of the existing 15-15B perforations using a CIBP is proposed
in preparing the well for a new coiled tubing drilling lateral. The new lateral will be targeting an undrained area to
the north of the existing B lateral leg. The new lateral will be a cemented and perforated solid liner.
HISTORY:
15-156 is a CTD sidetrack completed in January 2003. The sidetrack targeted an area not far from well
07-16, which had previously been part of a pilot program for water injection in the gravity drainage area.
During drilling, 15-15B crossed a fault and encountered notably higher water saturation on the
downthrown side. In fact, initial production from 15-156 was 95% water (1520 bpd gross fluid rate). The
well now makes ~ 30% water (340 bpd gross fluid), so not only has the water cut decreased, but the
total water rate has also dropped.
Upon completion, 15-15B was expected to spend some time de-watering the reservoir, after which the
oil rates would increase. 15-15B has never produced very much gas -In fact, the well required raw gas
lift for the first four months of its life, current gas rates are averaging about 13.5 MMSCFD with an
uptime of 36% in the last 12 months.
To offset the well's low production rate, 50' of perforations were added uphole in May 2004, but these
had no impact on production. A FCO and diesel/xylene pert wash treatment was proposed in July 2007
to help improve productivity. However, coil could not get past 11255' MD (top perfs are located at 12305'
MD) and so the 50:50 diesel/xylene was bullheaded without performing the FCO or pert wash /jetting
procedure. The well received negligible benefit from the bullheading treatment. Coil came back to
perform a mill and fill cleanout on 8/5/07 and successfully milled through the obstruction at 11255' MD to
TD. They encountered some scale-like material while conducting this operation. The post milling rates
showed the well producing at improved rates while on PBGL. Therefore, it was decided to pump an HCL
stim and add a multilateral to the existing leg.
The CTD multi-lateral attempt in December 2007 could not be completed after the CTU (pre riq pJgp,~,.
failed to set the whipstock at the desired Zone1 kick-off point of 11.345' and -due to dop leos. The coil /
whipstock BHA was getting hung up at 11,247' md. The job was aborted and the 4.5" KB LTP was set at
10,994' md. Prior to that, the well had an HCL stimulation treatment pumped in early December 2007
and the post acid rates showed the performance to have improved slightly with the well managing to
stay fulltime for about 5 months. However, the most recent POP attempt saw the well hitting MGOR
within 2 weeks of being brought online even after having been SI for 4 months.
15-156 had a passing MITIA to 3000 psi and a failing MITOA to 2000 psi on 10-30-2008. The MITT
passed to 3000 psi in September 2008 prior to a tree change out. The June 2007 calliper shows both
the 5-1/2" and 4-1/2" tubing to be in good shape with a maximum wall penetration = 34%.
REASON FOR SIDETRACK:
15-156 is a cycle well in the LP header with low fluid rates and a decreasing ontime. The well cycles
when the oil rate drops after initial flush production following ashut-in period, and the well very quickly
reaches MGOR. The CST will enable this 4-1/2"cr x 5-1/2"cr wellbore to be more effectively utilized.
Pre-Rig Work:
•
1. O PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi
2. O MIT-OA DONE 30-October- 2008
3. O MIT-IA. DONE 30-October-2008
4. S Drift to 10,900'MD for Baker 4-1/2" monobore whipstock.
5. S Set CIBP ~ 10,800' MD
6. O MIT -Tubing to 1000 psi
7. E Set 4-1/2" monobore whipstock with SLB WPP tool at 10,750' MD
8. O Function test LDS. ~ ~ ~ ~ ~ ~~~~ ~ t
9. O Set BPV \
10. O Bleed production flow lines and GL lines down to zero and blind flange
11. O Remove wellhouse, level pad, drill mouse hole.
Rig Sidetrack Operations: (Scheduled to begin on February 1, 2009)
1. NU 7-1/16" CT Drilling BOPS and test to 250 psi low and 3500 psi high
3. Mill 3.80" window at 10,750'.
4. Drill build/turn section with 4.25" bicenter bit, and land well.
5. Drill lateral section to 12,915' MD w/ resistivity log.
6. Run 3-1 /2"x 3-3/16"x 2-7/8" solid liner w/cementralizers to TD. Place liner top at 10,500' MD.
7. Cement liner from TD to TOL (10,500'MD) with 15.8ppb cement.
8. Clean out liner/Mill SELRT
9. Run MCNVGR/CCL log.
10. Test liner lap to 2000 psi.
11. Perforate per geologist.
12. Set liner top packer (if fails liner lap test)
13. Freeze protect well to 2500' with diesel.
14. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
15. RDMO Nordic 1.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
3. Run Live ga lift design
4. R to se ' tor, flow test well.
Mel Rixse
CTD Engineer
CC: Well File
Sondra StewmanlTerrie Hubble
~rt~o=
port • axasw
a air - s~.+~
Aa,. ~r
15-15B ~ „~ ~ l f~~ -a ~.,,~ ~~~T~
w+ wui ~n,t
~~
~~
v
vu
s~-r uwr
awrir w:'!
~rtw: ~~s.aan.o~
r tM~sk~
LHEAD= FMC
CTUATOR = AXELSCN
.aEV= er
. 0.EV = 39.8'
2800'
An9N = 75 011234'
m MD = 10863'
m TVD = 8800 SS
1132/8' CSC 72i, L-BQ D = 12.347' 1
Mnimum ID = 3.813" ~ 8878'
HES X NIPPLE
9572 1 67860 1 3e I LB I 310 I T2 24
14.1/2'HESXN~,D=3.613' I
ID =
lNR
X r 80T LNR
9~SR' CSQ 47t, 1-80, D = 8.581'
Plc11FORATIDN SUMAMIRY
REF LOO: SPEfiRY-SLNI MND 0112/19/98
ANC3LE AT TaP PERF: 92 011280'
5 -15 ~FEn NDTES: CMiOAAE TBQ 1MELL > 70' ~ 1094r AND
> 90' ~ 1113T • "' POSSIBLE IA x OA COMM.
Proposed CTD Sidetrack OPHRATINO PRESSURE Of THE 13.319" ANNULUS
MWT NOT EXCEED 2500 PSI (09R4A2 WAVER) "`
•
TSGR 10155'
10500 Top of LM~r; TOC
32 ° - r MLLOUT1MJ0011Y
1059T - 10609'
57
4 112' MLLOUT
VIRd00YY 11089'
14 7/2' monoboro w hlp~toc ~ I
B
PRJDHOE BAY UIVfT
YI~L: / S 15C
P@IMr1' NR
ARNr 50.02620991-03
h 1N R11Q 246T SNL i 1546'
S eltpenden )Alaska
STATE OF ALASKA ~~~ QED ~ 7 2~~~
ALASKA OIL AND GAS CONSERVATION COM ION
REPORT OF SUNDRY WELL OPERATIC Oil & Gas Cons. C~mrri~~slnn
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate [] Other acid treatment
Performed: ~ t ~~
Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development Exploratory 202-2580 -
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-20691-02-00
7. KB Elevation (ft): 9. Well Name and Number:
57.48 KB PBU 15-15B -
8. Property Designation: 10. Field/Pool(s):
ADLO-028309 PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 13050 ' feet Plugs (measured) None
true vertical 8964.54 - feet Junk (measured) None
Effective Depth measured 13017 feet
true vertical 8964.96 ~ feet
Casing Length Size MD TVD Burst Collapse
Conductor 3EE ATTACHMENT
Production
2007
~
es
Production ~~~7~ D~l,
Liner
Liner
Liner
Perforation depth: Measured depth: SEE ATTACHMENT - _ _ _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, and measured depth) 5-1 /2" 17# 13Cr80 24 - 9647
4-1/2" 12.6# 13Cr80 9647 - 9703
Packers and SSSV (type and measured depth) 5-1/2" Camco Bal-O SSV 2225
5-1/2" Baker S-3 Packer 9644
7" Baker ZXP Packer 9689
3-1/2" Baker KB Top Packer 10994
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 398 14969 208 331
Subsequent to operation:
14. Attachments: 15. Well Class after proposed work'
Copies of Logs and Surveys Run Exploratory ~ Development Service (`~
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ~' Gas ~' WAG ~ GINJ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Pre Title Data Management Engineer
Signature Phone 564-4944 Date 12/7/2007
Form 10-404 Revis 04/2006 ~A~~ E~~~+., ~ .t ~~~! \'a- I 1 Submit Original Only
•
15-15B
202-2580
PERF ATTACHMENT
MD OPN/SOZ TVD
11305 11330 O 8934 8937
11375 11400 O 8942 8945
11490 11550 O 8954.46 8960.41
11580 11710 O 8962.44 8966.42
11770 11870 O 8966.97 8965.58
12220 12330 O 8966.13 8963.35
12410 12540 O 8959.28 8963.62
12610 12710 O 8963.47 8965.18
12840 13010 O 8969.22 8965.1
15-15B
202-2580
Casina Attachment
Casin Len th Size MD To MD Base TVD_To TVD_Bas Burst Colla se
Conductor 83 20" 91.5# H-40 29 112 29 112 1490 470
Production 1 001 5 9-5/8" 47# L-80 26 10041 26 8231.11 6870 4760
Production 84 9-5/8" 47# SOO-95 10041 10125 8231.11 8298.63 8150 5080
Liner 766 7" 29# L-80 9831 10597 8063.85 8691.57 8160 7020
Liner 44 3-1/2" 9.3# L-80 10994 11038 8901.75 8911.36 10160 10530
Liner 1379 4-1/2" 12.6# L-80 9689 11068 7952.11 8915.93 8430 7500
Liner 328 3-3/16" 6.2# L-80 11038 11366 8911.36 8941.32
Liner 1684 2-7/8" 6.16# L-80 11366 13050 8941.32 8964.54 13450 13890
Surface 2526 13-3/8" 72# L-80 26 2554 28 2554 4630 2670
•
15-15B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVlTYDATE SUMMARY ,
12/1/2007T/I/O = SSV/2350/250. Temp SI. Bleed IAP < 500 psi (pre coil). No AL line.
;Integral installed on IA. IA FL @ 9572' sta #3 s/o, (412 bbls). Bled IAP from
12350 psi to 480 psi in 4 hours to an open top tank. Monitored for 15 min. No
;.change. Final W HP's SSV/480!250.
._. __ .,~ ._._._ .., ..~ ..~.........__ ~.___w.~...~~ __._. __~
12/2/2007 T/I/O=SSV/1220/225 Load IA (CTD prep) Loaded IA w/ 3.5 bbls 40* 60/40
meth/water & 414 bbls 85* crude. FW P=SSV/680!500
,n_ __ _ __ _ . _, __..
12/3/2007 Perf wash with acid. CTU #6 w/ 1.75" coil. MIRU. Perform weekly BOP test. Shut
down for night. Will resume in the morning.
`***Continued on 12/5/07 WSR***
__.__ .
12/5/2007; Acid Perf Wash, CTU#6 ***Continued from 12/3/07***Fluid pack well with 2%
;KCL. RIH with 1.75" JSN. Tag TD at 12,988' ctmd. Pump diesel down backside to
"establish positive WHP. Pump acid treatment - 50 bbls 2% KCL w/ F-103, 94 bbls
12% HCL, and 32 bbls 2% KCL w/ F-103. Saw no breakdown from the acid.
":Displace all behind pipe. Freeze protect coil with 60/40 meth. POOH. Pump 10
bbls 60/40 down flowline. RDMO. Turn well over to ASRC to flow back. RDMO,
;Notify DSO, ***Job Complete***
FLUIDS PUMPED
BBLS
14 Meth
245 KCL w/Safelube
80 KCI w/F-103
220 Diesel
94 Acid
60 60/40
714 TOTAL
15-15B (PTD #2022580) Under ~luation for sustained casing pressure ~IA communication Page 1 of 1
Regg, James B (DOA)
.__ _ __
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] '~C,~ ,, IljZ~rD~
Sent: Sunday, November 25, 2007 2:27 PM ' S
To: Regg, James B (DOA); Maunder., Thomas E (DOA); GPB, Area Mgr Central (GC1/3/FS3}; GPB, FS3
OTL; GPB, FS3 DS Ops Lead; NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel,
Harry R; Sinyangwe, Nathan
Cc: NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech; Roschinger, Torin T.
Subject: 15-15B (PTD #2022580) Under Evaluation for sustained casing pressure - TxIA communication
Attachments: 15-15B.psJf; 15-15B TIO.~iP
All, ~~ z/
Well 15-15B (PTD #2022580) has been found to have sustained casing pressure on the IA_ The wellhead pressures were
2370/2340/260 psi on 11/23/07 when a TIFL failed on build up rate. The well has been classified as Under Evaluation
and may be produced under a 28-day clock.
The plan forward is as follows:
1. D: TIFL -FAILED
2. S: Set DGLVs
3. F: MITIA to 3000 psi
4. CTD Sidetrack
i~~ ~~~ ~ ~ ZQQ7
A wellbore schematic and TIO plot have been included for reference
«15-156.pdf» «15-15B TIO.ZIP»
Please call with any questions or concerns.
Thank you,
r S~~,o ~~ ~ 7p~~
Andrea Hughes ,
Well Integrity Coordinator S~'-~ ~ ~~~~(~~
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
-~ ~= ~~z~
~,
'~
L~(~ ~~ Cep 4~ j S C-~
~ ~ ~ 45`~, ~z~p
11/26/2007
•
•
11000 ~
b'40
'd0 ~-
HI i-
~ql -s-
LOOZJO UZ L LOOZlSZJ 6 6 LOOZJ6J L L LOOZlSZJO L LOOZJO WO L LOOZJbZJ6
.. .....utLdL311.fi~'S 6
~2 _Z ~~ ~v~IYV~I V ~IJJ
LOOZl6J6 LOOZISU8
0
000' L
000' Z
000' £
u~u~u~u~uo 000'b
TREE= 5-118" FMC
WELLHEAD = FMC
RCTUATOR= AXELSON
KB. ELEV = 57.48'
BF. ELEV = 39.8'
KOP = 2900'
Max Angle = 94 @ 12358'
Datum MD = 10863'
Datum TV D = 8800` SS
13-318" CSG, 72#, L-80, ID= 12.347'" ~-j 2556
Minimum ID = 2.37" ~a 11370'
2-718" STL P1 CONNECTION
5-112" TBG, 17#, 13-CR, .0232 bpf, ID = 4.892" 9647'
2223' '--{5-1;2"CAMCOBAL-OSSSV N,ID=4.562„
GAS L3FT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 3910 3811 36 L8 DOME T2 16 07123/07
2 7253 6131 49 LB DOME T2 16 07/23/07
3 9572 7860 38 LB SO T2 20 07f23107
9642' --19-518" X 5-112" BKR S-3 PKR, ID = 5.750"
9647' 5-1l2" X 4-112" XO, ID = 3.938"
967$' 4-1 f2" HES X NIP, ID = 3.813"
4-1f2" TBG, 12.6#, 13-CR, .0152 bpf, ID= 3.958" , 9699' ~--- ~ ~ 97{}1' --17" UN1Qt1ERE-ENTRY Gll1DE
9689' 9-5/8'° X 7" BKR ZXP PKR, ID = 6.310"
9702' 9-5;8" X 7" BKR HI~1C LNR HGR, ID = 6.310"
9711' 7" X 4-1!2" XO, ID = 3.938"
9$31' TOP OF 7" BOT LNR HGR TIEBACK SLV
9841' 9-518" X 7" BOT LNR HGR
9-5i8" CSG, 47#, L-80, ID = 8.681" ~--~ 10127
PERFORATION SIJMhtARY
REF LOG: SWS MCNL!GRICCL ON 01/27103
ANGLE AT TOP PERF: 83 ;a7 11305'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn,Sgz DATE
2" 6 11305 - 11330 O 05123/04
2'° 6 11375 - 11400 O 05123/04
2" 4 11490 - 11550 O 01128?03
2" 4 11580- 11710 O Oit28.'03
2" 4 11370 - 11870 O 01128103
2" 4 12220 - 12330 O 01128!03
2" 4 12410 - 12540 O 01128x03
2" 4 12610 - 12710 O 01128103
2" 4 12840 - 13010 O 01128?03
15-15B
r' .
10994' --{ 3.70" BKR DEPLOY 5LV &
KB LNR TOP PKR, ID = 2.390„
11037" 3-1/2" HES XN NIP, ID = 2.750"
11038' 3-1%2" X 3-3116 BKR XO, ID = 2.880°`
MILLOUT TOP OF WINDOW 11068`
11366' 3-3116" X 2-718'° XO, ID = 2.441
7" LNR, 29#, L-80, ID = 6.184" ~--~ 11000'
4-112" LNR, 12.6#: L-80, ID = 3.958" 12653'
3-3;`16" LNR. 6.2#, L-80, .0076 bpf, ID = 2.800" 11366'
2-718" LNR, 6.16#, L-80, .0058 bpf. ID = 2.400" 13050°
DATE REV BY COMIt1ENT5
01t13f82 OR6GiNAL CflIVIPLETIC3N
12126(98 RIG SIDETRACK (15-15Ai
0113x103 DACtTL CTD SIDETRACK (15-15E
10'03102 BMITP V'JAIVER SA~~TY NOTE
031231'03 JMPIKK SAFETY NOTE REVISION
05123104 BJMeN/K ADPERFS
DATE REV BY COfv1MENTS
7{24107 P.~SJSV GLV C.'O _
)f09107 JPKITLH a~•.,c,cin~~zw-a~cor:z~c-i
PRUDHOE BAY UNIT
WELL: 15-158
PERMIT No: 2022580
API No: 50-029-20691-02
SEC 22, T11 N; R14E, 2467` SNL $~ 1546' EWL
~~~ £xpsoration 4AIa$ka}
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marlœr.doc
:Å- 8 FL~. ').. (j,~ ~
DATA SUBMITTAL COMPLIANCE REPORT
2/1/2005
Permit to Drill 2022580
Well Name/No. PRUDHOE BAY UNIT 15-15B
Operator BP EXPLORATION (ALASKA) INC
MD
TVD 8965 ---- Completion Date 1/29/2003 ~ Completion Status 1-01L
Current Status 1-01L
13050 '-_
- -- - --- -----~-----
--- ----- -----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
--~-
-------
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, ROP, RES, CNL, CCL
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
J¡L~1.¿ ÀJ J~ ,,{Q~.J
API No. 50-029-20691-02-00
UIC N
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run Interval OH/
Scale Media No Start Stop CH Received Comments
10881 13006 Open 4/29/2003
0--------- ___
LEfJ' 0
I
C:, yZ ·lw~u (\, J V
/ I I
&:fí652 i:+&Ve-rific.èÜiðn
~--- LIS Verification
I Fœ(i,
vr' Directional Survey
iÆD C Lis -,12076 LIS Verification
10881 13006 Open 4/29/2003
11042 13050 Open 3/26/2003
9550 12988 Case 4/14/2003
!\
~D C Tf ./ 12076 Neutron
2 9550 12988 Case 4/14/2003
2 9550 12988 Case 4/14/2003
2 Blu 9550 12988 Case 4/14/2003
2 Blu 9550 12988 Case 4/14/2003
ED C Tf
y
/12076 Casing collar locator
{", Log
L/'
: Log
[eutron
Casing collar locator
ÄED C Tf \12193 LIS Verification
!
¡ED C Pdf v12193 Rate of Penetration
V
I
JED C Pdf 42193 Induction/Resistivity
-----------
~.
Case Hole Wireling Data
for Compensated Neutron
Log - Memory
MCNUGR/CCL
Compensated Neutron
Log - Memory
MCNUGR/CCL
Compensated Neutron
Log - Memory
MCNUGR/CCL
Compensated Neutron
Log - Memory
MCNUGR/CCL
Compensated Neutron
Log - Memory
MCNUGR/CCL
':~
1-3 11 086 13050 Open 1 0/27/2003
25 1-3 11 086 13050 Open 10/27/2003 ROP, DGR, EWR - Repeat
Presentation
25 1-3 11086 13050 Open 1 0/27/2003 ROP, DGR, EWR - Repeat
Presentation
Permit to Drill 2022580
MD 13050
TVD 8965
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? vÐ
Chips Received? < V / N
Analysis
Received?
.~--
------------ ~
---- --- ------
Comments:
-----
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
2/1/2005
Well Name/No. PRUDHOE BAY UNIT 15-15B
Oper:âtorBP EXPLORATION (ALASKA) INC
API No. 50-029-20691-02-00
Completion Date 1/29/2003
Completion Status 1-01L
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
~
Current Status 1-01L
UIC N
Sample
Set
Number Comments
A
(j/N
!j IN
.~
Date:
:<) ¡v; tJ.A...)JJvf ')
~.
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
Abandon 0
Alter Casing D
Change Approved Program D
2. Operator
Repair Well 0 PluQ PerforationsD
Pull Tubing 0 Perforate New Pool D
Operation Shutdown 0 Perforate [KJ
4. Current Well Class:
Stimulate D OtherO
WaiverD Time ExtensionO
Re-enter Suspended Well 0
5. Permit to Drill Number:
202-2580
Name:
BP Exploration (Alaska), Inc.
Development ŒI
Exploratory D
57.48
8. Property Designation:
ADL-0028309
11. Present Well Condition Summary:
Total Depth measured 13050 feet
true vertical 8964.5 feet
Effective Depth measured 13017 feet
true vertical 8965.0 feet
StratigraphicD ServiceD
9. Well Name and Number:
15-15B
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
6. API Number
50-029-20691-02-00
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
RECEIVED
Plugs (measured)
Junk (measured)
¡i >
i'-'; l n
JH!J¡ ,J". . ~{I¡?4
ru~SAa Oil & G . '. ,\ .
An:;~
Casing Length Size MD TVD Burst Collapse
Conductor 83 20" 91.5# H-40 29 112 29.0 112.0 1490 470
Liner 1379 4-1/2" 12.6# L-80 9689 - 11068 7952.1 - 8915.9 8430 7500
Liner 766 7" 29# L-80 9831 - 10597 8063.9 - 8691.6 8160 7020
Liner 44 3-1/2" 9.3# L-80 10994 - 11038 8901.8 - 8911.4 10160 10530
Liner 328 3-3/16" 6.2# L-80 11038 - 11366 8911.4 - 8941.3
Liner 1684 2-7/8" 6.16# L-80 11366 - 13050 8941.3 - 8964.5 13450 13890
Production 10015 9-5/8" 47# L-80 26 - 10041 26.0 - 8231.1 6870 4760
Production 84 9-5/8" 47# 500-95 10041 - 10125 8231.1 - 8298.6 8150 5080
Surface 2526 13-3/8" 72# L-80 28 - 2554 28.0 - 2553.9 4930 2670
Perforation depth:
Measured depth: 11305 -11330,11375 -11400,11490 -11550,11580 -11710,11770 -11870,12220 -12330,12410 -12540
12840 -13010
True vertical depth: 8934.39 - 8937.39,8942.15 - 8944.57,8954.46 - 8960.41,8962.44 - 8966.42,8966.97 - 8965.58,8966.13 - 8963.35
8959.28 - 8963.62, 8963.47 - 8965.18, 8969.22 - 8965.1
Tubing (size, grade, and measured depth): 5-1/2" 17# 13Cr80 @ 24
4-1/2" 12.6# 13Cr80 @ 9647
Packers & SSSV (type & measured depth): 3-1/2" Baker KB Liner Top Packer @ 10994
5-112" Baker S-3 Packer @ 9644
5-112" Camco Bal-O SSV @ 2225
9647
9703
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Iniection Data
Gas-Met Water-Bbl Casing Pressure
11.8 233 600
11.9 222 532
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
362
356
Tubing Pressure
358
357
Copies of Logs and Surveys run _
15. Well Class after proposed work:
Exploratory D
16. Well Status after proposed work:
Oil ŒI Gas D
DevelopmentŒ]
Service 0
14. Attachments:
Daily Report of Well Operations. X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
.}j~~-
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
NIA
Title
Production Technical Assistant
Signature
Phone 564-4657
Date
8/5/04
Form 10-404 Revised 4/2004
Wil~;;~\ i\lN!~"
l\"\'L).l:. .~ '."
1f:,l:J l-¡ . ,.L
)
,)
15-15 B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
05/08/04 **** WELL FLOWING ON ARRIVAL ****. MIRU RIH WI 2" X 121 DUMMY GUN, SAT DOWN
@ 10954 SLM, WORKED TO 10,974, POOH. (DEPLOYMENT SLEEVE @ 10994 MD, 74
DEG). RIH WI SAME TOOL STRING WI 2.25 LIB, SAT DOWN AT 10,9641, POOH. LIB
SHOWED TOP OF D-SLV. CHANGE TOOL STRING TO 1.5 RS WI 1.5 HYD JAR WI 1.5
SPANG JAR WI 2" X 101 DUMMY GUN SAT DOWN @ DEV, 11,0371 SLM POOH. RDMO
COMPLETE AREA INSP.PAD OP NOTIFIED TO POP.
05/22/04 MIRU CTU#5 FOR GR/CCL & ADD PERFS. MU/RIH WI PDS GR/CCL LOG, NZL ON BTM.
LOG FROM 116001·107001. FLAG PIPE @ 11300'. POOH. MHA CKS LEAKED.
CHANGEOUT TO NEW MHA. MU/RIH WI 251 OF 2" PJ GUNS. CONTINUED ON 05/23/04
WSR.
05/23/04 113051.1133016 SPF, 113751.1140016 SPF
FLUIDS PUMPED
BBLS
76 1 % KCL
1 04 50/50 Methanal
180 TOTAL
Page 1
)
)
lREE = 5-1/8" FWC
WELLHEA D = FWC
ACl1JATOR= ~-AX1iSor\r
'RB:-ËCEV = ,.. -- n____n -57~-48ï'
SF. ELEV = --- 39:i:V
KOP = 2900'
.... ...................... ........... . ....................... ..~
Max Angle = 94@ 12358'
Datum I\iÐ = 10863'
't>ãtum i\/6;;;näaöõisS-
SAÆTYNOTES: 4-1/2" & 5-1/2" CHROMETBG.
WELL> 70° @ 10947'
15-158
- 2223' 1-15-1/2" CA WCO BAL-O SSSVN, 10 = 4.562"
~ GAS LIFT MANDRELS
ST IvD lVO DE\! TYPE VLV LATCH PORT DATE
1 3910 3811 36 LB 00 ME T2 16 02/04/03
L 2 7253 6131 49 LB OV T2 20 02/04/03
3 9572 7860 38 LB DMY T2 0 02/04/03
1 13-3/8"CSG, 72#, L-80, D = 12.347" H 2556' ~
Minimum ID = 2.37" @ 11370'
2-7/8" STL PIN CONNECTION
9642' 1-9-5/8" X 5-1/2" BKR 5-3 PKR, 10 = 5.750"
964T 1-15-1/2" x 4-1/2" XO, 10 = 3.938" 1
:8: ~
t J
15-1/2" TBG,17#, 13-CR, .0232 bpf, 10=4.892" 1-1 9647'
9678' 1-4-1/2" HES X NIP, 10 = 3.813" 1
1-17" LNIQUE RE-ENTRY GUlOE 1
1-9-5/8"X 7"BKRZXPPKR, 10= 6.310" 1
1-19-5/8" X 7" BKR HMC LNR HGR, 10 = 6.310"
I-iT' X4-1/2"XO,10= 3.938" 1
I-iTOP OF 7" BOT LNR HGR TIEBACK SL V
1-9-5/8" X 7" BOT LNR HGR 1
14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, 10 =3.958" H 9699'
~
1-1
\,I,.i,!,".!I.,·~.'.:. 1
¡g¡! 1
1
L-f
~
9701'
9689'
9702'
9711'
9831'
9841'
)(
1'···,···.'·'·.,·.····1..'..'...,'.
Mt
I
19-5/8" CSG, 47#, L-80, 10 = 8.681" 1--1 10127' r--AI
ÆRFORA TON SUMMARY
RB= LOG: SWS WCNL/GR/CCL ON 01/27/03
ANGLE AT TOP ÆRF: 83 @ 11305'
Note: Refer to Production OB for historical perf data
SIZE SA= NTERVAL Opn/Sqz OA TE
2" 6 11305 - 11330 0 OS/23/04
2" 6 11375-11400 0 OS/23/04
2" 4 11490 - 11550 0 01/28/03
2" 4 11580 - 11710 0 01/28/03
2" 4 11770-11870 0 01/28/03
2" 4 12220 - 12330 0 01/28/03
2" 4 12410- 12540 0 01/28/03
2" 4 12610-12710 0 01/28/03
2" 4 12840 - 13010 0 01/28/03
1 T' LNR, 29#, L-80, 10 = 6.184" I~ 11000'
10994' 1-3.70" BKROER.OY SLY &
KB LNR TOP A<R, 10 = 2.390"
11037' 1-13-1/2" HES XN NIP, 10 = 2.750" 1
11038' 1-3-1/2"X 3-3/16 BKRXO,IO =2.880"
I MIL LOUT TOP OF WINOOW 11068'
11366' H3-3/16" X 2-7/8" XO, 10= 2.441
14-1/2" LNR, 12.6#, L-80, 10 = 3.958" H 12653' 1
13-3/16" LNR, 6.2#, L-80, .0076 bpf, 10 = 2.800" H 11366' 1
12-7/8" LNR, 6.16#, L-80, .0058 bpf, 10 = 2.400" H 13050' 1
DA TE REV BY COM'v1BJTS
01/13/82 ORIGINAL COMPLETION
12/26/98 RIG SIŒTRACK(15-15A)
01/30/03 DAC/TLH CTDSIDETRACK(15-15B)
10/03/02 BM'TP WAWER SAFETY NOTE
02/04/03 RL/tlh GL V URJA TE
03/23/03 JrvP/KK SA FETY NOTE REV ISION
OA TE REV BY COMrvENTS
06/05103 CWOffLP MAX ANGLE
09/11/03 CWOffLP PERF ANGLE CORRECllON
05123104 BJMcN'KK AI:FERFS
PRLDI-DE BA Y lJ\J1T
WELL: 15-15B
PERMrr No: 2022580
AA No: 50-029-20691-02
SEC 22, T11N, R14E, 2467' St-.l. & 1546' EWL
BP Exploration (Alaska)
)
t)a9- -ßSg
)
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
October 14, 2003
RE: MWD Formation Evaluation Logs: 15-15B,
AK-MW-30011
IS-ISB:
Digital Log Images
50-029- 20691-02
1 CD Rom )f:) J93
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
..' '"
Signe~~CJ ~~~^C~~ ~Q ~~
OCT ? 7' ?DC:5
I, "
~~~\\\-~
')
')
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7tb. Avenue, Suite 100
Anchorage, Alaska
April 21, 2003
RE: MWD Formation Evaluation Logs 15-15B,
AK-MW-30011
1 LDWG formatted Disc with verification listing.
AP.I#: 50-029-20691-02
dDõ1-é)S({
II f.rJ5~
PLEASE ACKNOWLEDGE RECEJPT BY SIGNING AND RETURNING A COpy OF TH.E TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical :Oata Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
si4 '-106- ~
RECE\VEO
APR 29 2003
A1aeka Oü & Gas Cons. eommiteion
Andtonsge
04/8/03
Schlumbepgep
NO. 2742
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay, Endicott,Milne Pt
Well
Job#
Log Description
Color
Date Blueline Prints CD
01/13/03 1 1 /80 ::¡.c.r
12/15/02 1 1 ) t).CB:O¡
12/29/02 1 1 J [l.n '":f?5
01/30/03 1 1 JP0i5 )~
12/13/02 1 1 )~ í
01/27/03 1 1 I, ~.-:¡-rp
c~
~2 \5SS-ì,?r
~ª--29 \~ 6 -,q lð
1~2-12A )9Cj-\ In.S
~6 ''31-1 d:)
:4:s. 11-28A ~co -t!:R.c;, 23021
~S. 15-15B~~O -é)Sg' 23067
23051
23022
23018
23075
RST -SIGMA
RST-SIGMA
MCNL
RST -SIGMA
RST -SIGMA
MCNL
- -----
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~~ ~ r; ."... P J'--- -.
J.") :¡:.--" ~!!:aft ~ '\ . ~ ~ )
;j '\;.'= ,':.oJ !1..."... ~ ~ 1= ~
,,~ .--
"~c.\"~-Ç. ,~~,~.~. .'-.c. C\~~)V'\..
):\; r~ I ~I t.. V \)\)
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
Received by:
AJ,~~k~ \)¡) & Gas Cc·ns. Gcmrni~n
And1Or!ge
')
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~"I!I'W"\íI\l"'1î¡1 '''''¡~'_'jf.
1. Status of Well ~b;.)(~\\n~'I· Classification of Service Well
181 Oil 0 Gas 0 Suspended 0 Abandoned [J~;~p~i;?.e...,. \¡~:,\fm~',
2. Name of Operator '..,;I.::': ¡~1W¡¡"i;ŒJ 7. Permit Number
3. A~;::r~:1:1::~~:~e. Alaska 99519-6612 :~f~¡~'~~',;~J 8. ~~:~;~¡91-02
4. Location of well at surface 9. Unit or Lease Name
2467' SNL, 1546' EWL, SEC. 22, T11N, R14E, UM X = 677510, Y = 5959051 Prudhoe Bay Unit
At top of productive interval
21261 SNL, 3727' EWL, SEC. 27, T11N, R14E, UM X = 679816, Y = 5954166 10. Well Number
At total depth
24741 SNL, 1968' EWL, SEC. 27, T11N, R14E, UM X = 678066, Y = 5953776
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field I Prudhoe Bay Pool
KBE = 57.48' ADL 028309
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
1/23/2003' 1/25/2003 ' 1/29/2003
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
13050 8965 FT 13017 8965 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, ROP, RES, CNL, CCL
15-158
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2223' MD 1900' (Approx.)
~~ /LObçl'm.Þ
ß7 / i./ '7Vl:>
23.
CASING
SIZE
CASING, LINER AND CEMENTING RECORD
AMOUNT PULLED
SETTING DEPTH
WT. PER FT. GRADE Top BOTTOM
94# H-40 Surface 80'
72# L-80 Surface 25561
47# L-80 / SOO-95 Surface 10127'
29# L-80 9831' 105971
12.6# L-80 9689' 11068'
9.3#/6.2/6.16# L-80 10994' 13050'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
2" Gun Diameter, 4 spf
MD TVD
11490' - 11550' 8954' - 8960'
11580' - 11710' 8962' - 8966'
11770' - 11870' 8967' - 8966'
12220' - 12330' 89661 - 8963'
12410' - 12540' 8959' - 8964'
12610' -12710' 8963' - 8965'
12840' - 13010' 8969' - 8965'
20"
13-3/8"
9-518"
7'1
4-1/2"
MD
TVD
27.
Date First Production
February 13, 2003
Date of Test Hours Tested
HOLE
SIZE
30"
17-1/2"
12-1/4"
8-1/2"
6"
CEMENTING RECORD
300 sx Permafrost II
2300 sx Fondu, 400 sx Permafrost
500 sx Class 'G'
400 sx Class 'G'
395 sx Class 'G'
113 sx Class 'GI
·3-1/2" x 3-3/16" x 2-7/8"
3-3/4"
25.
TUBING RECORD
SIZE DEPTH SET (MD)
5-1/2", 17#, 13Cr 9649'
4-1/2", 12.6#,13Cr 9649' - 9701'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protected with meOH
PACKER SET (MD)
9642'
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL
TEST PERIOD
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
MAR 1 0 2003
No core samples were taken.
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
28.
Form 10-407 Rev. 07-01-80
CHOKE SIZE
GAS-OIL RATIO
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
RECEIV'ED
Çij~k!i Oil & Gas Gons. Gomm~s~¡~~~
''\~'\.'''\'ThL~:'·'
¡{,J\~~~l!fiY'h""W~~ _
( '\-:
\..:;
;04RS~b~it ~~n~Uplicate
, l_ L',' 'I. ':!
RBDMS BFL
)
)
Marker Name
Geologic Markers
Measured
Depth
30.
Formation Tests
29.
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Sadlerochit - Zone 1A
11156'
8922'
RECEIVE
MAR 1 0 200J
~œ&Gæ~,CÐslIDBJ~B
~
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble ~ N\i..R 41 ~ Title Technical Assistant Date D3" () 7· Q ~
15-158 202-258 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Mark Johnson, 564-5666
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
')
)
BP EXPLORATION
Operations$umrnary Report
Page fOf 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date From-To Hours Task Code NPT" Phase . Description of Operations
1/21/2003 00:00 - 02:45 2.75 MOB N WAIT PRE Wating for DS-15 site to be prepped after storm, snow removal
has delayed the pad prep.
02:45 - 03:00 0.25 MOB P PRE PJSM: Pre Rig move safety meeting with crew, security
03:00 - 07:00 4.00 MOB P PRE Move rig from DS-14 to DS-15. Derrick down.
07:00 - 12:00 5.00 MOB P PRE Spot rig in front of 15-15A. Inspect Pad. Level pad and raise
wind walls. Meanwhile DSM blind flowline, after servicing
valves the line still builds up to 890psi.
12:00 - 15:00 3.00 MOB P PRE Tilt rams. P/U injector & gooseneck. C/O packoff & stab CT.
15:00 - 19:30 4.50 MOB N WAIT PRE Begin Standby. Continue W.O. DSM to finish blinding 15-15
flowline which has a leaking grove valve.
19:30 - 19:50 0.33 MOB P PRE Safety mtg re: move over tree
19:50 - 20:30 0.67 MOB P PRE Move rig over tree and set down. Accept rig @ 20:30 Hrs on
1/21/2003.
20:30 - 21 :30 1.00 P PRE ND tree cap. NU BOPE
21 :30 - 00:00 2.50 P PRE Test BOPE. Witness waived by AOGCC
MIRU cuttings boxlberm, MU hardline to flowback tank and PT
Spot misc equipment
1/22/2003 00:00 - 04:00 4.00 P PRE Finish initial BOPE test
04:00 - 04:30 0.50 P PRE Prespud mtg
Fill pits with KCl/bio. Check well for press-85 psi. Bleed to
zero. IA 15, OA 20
04:30 - 05:15 0.75 STWHIP N WAIT WEXIT WOWII
05: 15 - 05:30 0.25 STWHIP P WEXIT Load 2 RA tags in WS. TOWS to RA tag = 8.9'.
05:30 - 06:45 1.25 STWHIP P WEXIT MU WII CTC. Load WS in pipeshed
06:45 - 07: 15 0.50 STWHIP P WEXIT Cut coil. Install Weatherford Slip CTC. Pull test to 35k.
07:15 - 08:30 1.25 STWHIP P WEXIT Circulate & fill CT with KCL water. PlTest CTC to 3500psi.
PlTest inner reel valve to 3500psi.
08:30 - 08:45 0.25 STWHIP P WEXIT Held pre-operations safety meeting. Reviewed well plan,
potential hazards & BHA M/U procedures.
08:45 - 09: 15 0.50 STWHIP P WEXIT M/U whipstock setting BHA # 1 with WI! LSX whipstock, setting
tool & Sperry memory ESS tool. Check swivel jt .... OK. M/U
MHA. Stab injector on well.
09:15-12:00 2.75 STWHIP P WEXIT RIH with BHA #1 taking returns to tiger tank. Wt check @
11000': P/U = 45k & S/O = 25k. Continue RIH BHA#1 & lightly
tag the CIBP @ 11300'. P/U & retag @ same depth. Correct up
depth (11297') to the ELM of 11260'.
12:00 - 12:15 0.25 STWHIP P WEXIT PUH to 11073' & postion for TOWS @ 11060' (TOWS to
BOWS = 13.07').
12:15 - 12:45 0.50 STWHIP P WEXIT Load 5/8" steel ball. Launch ball into CT & chase ball @ 2 bpm,
600psi. Slow to 0.5bpm & chase ball to seat @ 44bbls away.
Pressure up to 2500psi to shear tool, saw little pressure drop
before building back up to 4500psi (1/16" weep hole &
bio-KCL). Wait for ESS tool to record orientation, Set down wt
& confirm whipstock set. P/U with 44k,
12:45 - 15:45 3.00 STWHIP P WEXIT POOH whipstock setting BHA #1 circ @ 0.5bpm/4000psi.
Continue taking returns to tiger tank due to FP fluid tripping
LEL alarms. POOH from 6000' filling hole from the backside.
15:45 - 16:15 0.50 STWHIP P WEXIT OOH. UO whipstock setting BHA#1 & recover 5/8 ball. Check
shear rod"" OK. Meanwhile observe that ESS tool did not
record orientation due to instrument failure. Review with town &
proceed as per plan.
16:15-17:00 0.75 STWHIP P WEXIT M/U window milling BHA # 2 with HCC DSM, diamond string
reamer, WI! straight motor, MHA & 2 jts of PH6 tbg. Stab
Printed: 2/3/2003 12:22: 18 PM
)
)
BP EXPLORATION
OperationsSummary.Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
From,- To Hours Task· Code NPT Phase
1/22/2003
16:15 - 17:00
17:00 - 18:50
18:50 - 19:25
0.75 STWHIP P
1.83 STWHIP P
0.58 STWHIP P
WEXIT
WEXIT
WEXIT
19:25 - 20:20 0.92 STWHIP P
20:20 - 21 :35 1.25 STWHIP P
21 :35 - 22:30 0.92 STWHIP P
22:30 - 23:40 1.17 STWHIP P
23:40 - 00:00 0.33 STWHIP P
1/23/2003 00:00 - 02:05 2.08 STWHIP P
02:05 - 02:30 0.42 STWHIP P
02:30 - 04:25 1.92 STWHIP P
04:25 - 04:45 0.33 STWHIP P
04:45 - 05:30 0.75 DRILL P
05:30 - 06:25 0.92 DRILL P
06:25 - 08: 15 1.83 DRILL P
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
PROD1
PROD1
08:15 - 08:25 0.17 DRILL P PROD1
08:25 - 09:00 0.58 DRILL P PROD1
09:00 - 09:45 0.75 DRILL P PROD1
09:45 - 09:50 0.08 DRILL P PROD1
09:50 - 10:15 0.42 DRILL P PROD1
10:15 -10:40 0.42 DRILL P PROD1
10:40 - 10:50 0.17 DRILL P PROD1
10:50 -11:05 0.25 DRILL P PROD1
11:05-11:55 0.83 DRILL P PROD1
11:55 -12:00 0.08 DRILL P PROD1
12:00 - 12:15 0.25 DRILL P PROD1
12:15 -12:35 0.33 DRILL P PROD1
12:35 - 13:00 0.42 DRILL P PROD1
13:00 -13:15 0.25 DRILL P PROD1
Page 2 of 10
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Descri ption of Operations
injector on well.
RIH with BHA #2 taking returns to tiger tank.
Tag WS at 11062.5' CTD. PUH 53k (pinch pt) and start pump
2.7/1430. RIH and first motor work at 11059.0' CTD. Corr to
11060.0' and flag CT
Mill window from 11060.0' 2.5/1340. Bleed IA from 800 to 40
psi
11061.0'
11062.0'
11063.0'
11064.0-11064.5'
Mill window from 11064.5'-11068.0'. Drill open hole from
11068-11080'
Ream window area and dry tag, clean
POOH for drilling assy
LD milling BHA. Mill and SR both 3.80" w/ very little wear-4th
well for dia SR
MU drilling BHA
Install DS CTC. PT @ 3500 psi, 35k
RIH with BHA #3. SHT MWD & orienter - OK. Continue RIH to
11000'. Wtcheck: Upwt=47k, Dwnwt=21k. Run thru window
with pumps down & tag btm @ 11115'. Correct depth to 11080'.
Meanwhile start swapping well to rebuild 8.6ppg, 12# K-G, 3%
L-T flo-pro mud.
Orient TF to 70R. Observe a 1 ftvd discrepancy b/w Compass &
Geotrack. Consult BHI town team & agree to tie into Compass
values.
Begin drilling build/turn section with 70R TF, 2.7/2.7bpm,
3200/3550psi & 55fph ave ROP. Drilled to 11123'. Inclination
coming up > 82degs - thus W/S was set in right direction.
Orient & drill to 11171' with 95-100R TF, 2.7/2.7bpm,
2950/3450psi & 708fph ave ROP.
Orient & drill to 11177' with 95-100R TF, 2.7/2.7bpm,
3150/3450psi & 60fph ave ROP. Have new mud around. TF
flopping.
Orient TF to 90R.
Drill to 11219' with 90R TF, 2.7/2.7bpm, 3150/3450psi &
100fph ave ROP.
Drill to 11230' with 90-95R TF, 2.7/2.7bpm, 3150/3450psi &
55fph ave ROP.
Wiper trip to window. Clean hole. Pull up to 10920' for tie-in
log.
Log GR & tie-in with shale marker @ 10870' using geology
PDC log (12/20/1998CNL). Log RA Pip tag. Added 9' to CTD.
Corrected depths are: TOWSITOW = 11068', BOW = 11076',
RA PIP Tag = 11077', BOWS = 11081'.
RBIH clean to TD tagged @ 11239'.
Orient TF to 90R.
Drill to 11260' with 90R TF, 2.7/2.7bpm, 3000/3700psi & 65fph
ave ROP.
Drill to 11282' with 95-100R TF, 2.7/2.7bpm, 3000/3300psi &
50fph ave ROP.
Orient TF to 80R.
Printed: 2/3/2003 12:22: 18 PM
)
)
BP EXPLORATION
O,perations Summary Report
Page30f 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
1/23/2003
1/24/2003
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
From - To Hours Task Code NPT Descri ptionof Operations
13:15-13:25 0.17 DRILL P PROD1 Drill to 11293' with 70R TF, 2.7/2.7bpm, 3000/3300psi & 65fph
ave ROP.
13:25 - 13:55 0.50 DRILL P PROD1 Drill to 11343' with 90R TF, 2.7/2. 7bpm, 3000/3350psi & 95fph
ave ROP.
13:55 - 14:10 0.25 DRILL P PROD1 Orient TF to 70R.
14:10 - 14:55 0.75 DRILL P PROD1 Drill to 11372' with 70R TF, 2.7/2.7bpm, 3000/3500psi & 35fph
ave ROP.
14:55 - 15:10 0.25 DRILL P PROD1 Orient 1 click & drill to 11390' with 90R TF, 2.7/2.7bpm,
3000/3500psi & 65fph ave ROP.
15:10 - 15:25 0.25 DRILL P PROD1 Orient 1 click & drill to 11400' with 110R TF, 2.7/2.7bpm,
3000/3500psi & 40fph ave ROP.
15:25 - 17:30 2.08 DRILL P PROD1 POOH for lateral BHA.
17:30 - 17:45 0.25 DRILL P PROD1 PJSM for BHA C/O.
17:45 - 19:30 1.75 DRILL P PROD1 C/O MWD tools & P/U resistivity tool. Adjust motor bend to
1.04degs. C/O bit to used HYC DS49.
19:30 - 21 :30 2.00 DRILL P PROD1 RIH w/ BHA #4 SHT
21 :30 - 21 :45 0.25 DRILL P PROD1 RIH thru window, clean. Precautionary ream to TD. Tag at
11432' and corr to 11400'
21:45 - 22:15 0.50 DRILL P PROD1 Log MAD pass up to window. SS MWD intermittent below
window
22:15 - 22:30 0.25 DRILL P PROD1 Log tie-in up from 11130' and data collector wasn't turned on.
MWD tools quit again
22:30 - 23:10 0.67 DRILL N DFAL PROD1 Start MWD, try to log and tool quits. Log again at higher pump
rate, no corr
23: 10 - 23:25 0.25 DRILL P PROD1 RIH to TD
23:25 - 23:45 0.33 DRILL P PROD1 Orient to drill and tool quit. PVT 282
23:45 - 00:00 0.25 DRILL N DFAL PROD1 POOH for MWD. OverpulllMW at 11240'
00:00 - 01 :20 1.33 DRILL N DFAL PROD1 Continue POOH for MWD failure
01 :20 - 03:05 1.75 DRILL N DFAL PROD1 Check BHA and found 'extended pulser' in MWD tool. Change
out pulser
03:05 - 05: 15 2.17 DRILL N DFAL PROD1 RIH w/ BHA #4RR. RIH thru window, clean. Tag TD at
11433.2'. Corr to 11400'
05: 15 - 05:25 0.17 DRILL P PROD1 Orient
05:25 - 06:25 1.00 DRILL P PROD1 Drill from 11400' 2.5/3230/80R. Drill to 11517'
06:25 - 06:40 0.25 DRILL P PROD1 Orient around
06:40 - 07:35 0.92 DRILL P PROD1 Drill to 11555' with 40R TF, 2.7/2.7bpm, 3200/3600psi & 45fph
ave ROP.
07:35 - 07:50 0.25 DRILL P PROD1 Wiper trip clean to window. RBIH to btm.
07:50 - 08: 15 0.42 DRILL P PROD1 Drill to 11590' with 50R TF, 2.7/2.7bpm, 3200/3500psi &
110fph ave ROP.
08: 15 - 09:45 1.50 DRILL P PROD1 Drill to 11715' with 65-90R TF, 2.7/2.7bpm, 3200/3400psi &
90fph ave ROP.
09:45 - 10:20 0.58 DRILL P PROD1 Wiper trip clean to window. RBIH to btm.
10:20 - 10:30 0.17 DRILL P PROD1 Orient TF to 90L.
10:30 - 11 :00 0.50 DRILL P PROD1 Drill to 11750' with 85L TF, 2.7/2.7bpm, 3200/3400psi & 75fph
ave ROP.
11 :00 - 11 :20 0.33 DRILL P PROD1 Orient 2 clicks & drill to 11773' with 55L TF, 2.7/2.7bpm,
3200/3400psi & 75fph ave ROP.
11 :20 - 11 :35 0.25 DRILL P PROD1 Orient TF to 80L.
11 :35 - 12:25 0.83 DRILL P PROD1 Drill to 11855' with 70-80L TF, 2.7/2.7bpm, 3200/3400psi &
110fph ave ROP.
12:25 - 13:15 0.83 DRILL P PROD1 Wiper trip clean to window. Continue wiping to 10600' (40degs
inclination). RBIH to 11130' for tie-in.
Printed: 2/3/2003 12:22:18 PM
) )
BP EXPLORATION Page 4 of 10
Ope.rations Summary Røport
Legal Well Name: 15-15A
Common Well Name: 15-15A Spud Date: 12/22/1981
Event Name: REENTER+COMPLETE Start: 1/21/2003 End: 1/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 1/29/2003
Rig Name: NORDIC 1 Rig Number:
Date From -To Hours Task Code NPT
1/24/2003 13:15 -13:30 0.25 DRILL P PROD1 Log & tie-into RA PIP tag & added l' to CTD.
13:30 - 13:50 0.33 DRILL P PROD1 RBIH clean to bottom.
13:50 - 14:00 0.17 DRILL P PROD1 Orient TF to 105L.
14:00 - 14:15 0.25 DRILL P PROD1 Drill to 11872' with 110L TF, 2.7/2.7bpm, 3200/3500psi & 70fph
ave ROP.
14:15 - 15:15 1.00 DRILL P PROD1 Orient & drill to 11974' with 95L TF, 2.7/2.7bpm, 3200/3500psi
& 90fph ave ROP.
15:15 -15:30 0.25 DRILL P PROD1 Orient & drill to 11984' with 80L TF, 2.7/2.7bpm, 3200/3500psi
& 90fph ave ROP.
15:30 - 15:40 0.17 DRILL P PROD1 Orient TF to 50L.
15:40 - 15:55 0.25 DRILL P PROD1 Drill to 12022' with 60L TF, 2.7/2.7bpm, 3250/3600psi & 150fph
ave ROP. Getting 220degs reactive & seems like we crossed a
fault @ 11190'. Observe no losses. PVT = 263bbls.
15:55 - 16:50 0.92 DRILL P PROD1 Wiper trip clean to window. RBIH to btm.
16:50 - 17:00 0.17 DRILL P PROD1 Orient TF to 70L.
17:00 - 17:05 0.08 DRILL P PROD1 Drill to 12029' with 60L TF, 2.7/2.7bpm, 3200/3500psi & 70fph
ave ROP. TF flopping to 40R.
17:05 - 17:25 0.33 DRILL P PROD1 Orient TF to 70L. Drill to 12031' & TF flops again. Reorient TF
to 40L
17:25 - 18:15 0.83 DRILL P PROD1 Drill to 12100' with 60L TF, 2.6/2.6bpm, 3000/3250psi & 95fph
ave ROP.
18:15 -18:35 0.33 DRILL P PROD1 Orient 1 click & drill with 35L TF, 2.7/2.7bpm, 3000/3350psi.
Drill to 12130'
18:35 - 18:50 0.25 DRILL P PROD1 Orient around
18:50 - 19:20 0.50 DRILL P PROD1 Drill from 12130' 2.5/3220/79R to 12200'
19:20 - 19:55 0.58 DRILL P PROD1 Wiper to window
19:55 - 20:10 0.25 DRILL P PROD1 Log down from 11110', no corr
20: 1 0 - 20:40 0.50 DRILL P PROD1 RIH clean to TD at 12200'
20:40 - 20:55 0.25 DRILL P PROD1 Orient
20:55 - 21 :20 0.42 DRILL P PROD1 Drill from 12200' 2.4/300011 OOR to 12236' holding 92 deg
21 :20 - 22:05 0.75 DRILL P PROD1 Orient around, drill 12' , orient around again (for Harry)
22:05 - 23:20 1.25 DRILL P PROD1 Drill from 12247' 2.5/3200/62R to 12318' and mud is shot
23:20 - 00:00 0.67 DRILL P PROD1 Wiper to 10600'
1/25/2003 00:00 - 00:50 0.83 DRILL P PROD1 Wave to N2. Fin wiper to 10600'. RBIH. Start new mud. Tag
TD at 12318'
00:50 - 01 :15 0.42 DRILL P PROD1 Orient around
01 :15 - 02:30 1.25 DRILL P PROD1 Drill from 12318-12394' 2.6/2800/90-120R and inadvertantley
build angle to 93.5 deg and get into hard drilling (assume cap
rock)
02:30 - 03:05 0.58 DRILL N 5FAL PROD1 Wiper while 55 reboots PC. RBIH
03:05 - 03:25 0.33 DRILL P PROD1 Drill from 12394' 2.8/3400/120-170R and get back in sand.
Drill to 12432'
03:25 - 03:45 0.33 DRILL P PROD1 Orient around
03:45 - 04:15 0.50 DRILL P PROD1 Drill from 12432' 2.7/3050/90R to 12480'
04: 15 - 05:35 1.33 DRILL P PROD1 Wiper to window, clean. Tag TD at 12480'
05:35 - 06:00 0.42 DRILL P PROD1 Orient around
06:00 - 06:20 0.33 DRILL P PROD1 Drill from 12480' 2.6/3000/80R to 12527'
06:20 - 06:25 0.08 DRILL P PROD1 Orient around
06:25 - 06:50 0.42 DRILL P PROD1 Drill to 12574' with 45-50L TF, 2.5/2.5bpm, 2850/3200psi &
130fph ave ROP.
06:50 - 07:00 0.17 DRILL P PROD1 Orient TF to 80-90L to hold.
07:00 - 07:30 0.50 DRILL P PROD1 Drill to 12616' with 80-90L TF, 2.5/2.5bpm, 2850/3200psi &
95fph ave ROP.
Printed 2/3/2003 12:22: 18 PM
')
')
BPEXPLORATION
Operations Summary Report
Page' 5 of 1 0
Legal Well Name: 15-15A
Common Well Name: 15-15A Spud Date: 12/22/1981
Event Name: REENTER+COMPLETE Start: 1/21/2003 End: 1/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 1/29/2003
Rig Name: NORDIC 1 Rig Number:
Date From:.. To Hours Task Code NPT Phase
1/25/2003 07:30 - 07:45 0.25 DRILL P PROD1 Drill to 12638' with 80-90L TF, 2.5/2.5bpm, 2850/3200psi &
75fph ave ROP.
07:45 - 08:00 0.25 DRILL P PROD1 Drill to 12656' with 100L TF, 2.5/2.5bpm, 2850/3200psi &
100fph ave ROP.
08:00 - 08:15 0.25 DRILL P PROD1 Drill to 12660' with 90L TF, 2.5/2.5bpm, 2850/3200psi & 70fph
ave ROP.
08: 15 - 09:40 1.42 DRILL P PROD1 Wiper trip to window with slight bobbles across 12450' shale.
RBIH clean to btm.
09:40 - 11 :10 1.50 DRILL P PROD1 Drill to 12771' with 60-90L TF, 2.5/2.5bpm, 2850/3200psi &
60fph ave ROP. Getting 180 degs reactive & seems like we
crossed a fault @ 12761'. Observe no losses. PVT = 263bbls.
11: 1 0 - 11 :20 0.17 DRILL P PROD1 Drill to 12781' with 165L TF, 2.5/2.5bpm, 2850/3200psi &
150fph ave ROP.
11 :20 - 11 :35 0.25 DRILL P PROD1 Orient & drill to 12793' with 15R TF, 2.5/2.5bpm, 2850/3200psi
& 130fph ave ROP.
11 :35 - 11 :50 0.25 DRILL P PROD1 Orient TF to 90L.
11 :50 - 12:10 0.33 DRILL P PROD1 Drill to 12820' with 90L TF, 2.7/2.7bpm, 3000/3350psi & 85fph
ave ROP.
12:10 - 12:30 0.33 DRILL P PROD1 Orient 2 clicks & drill to 12850' with 40L TF, 2.7/2.7bpm,
3000/3350psi & 100fph ave ROP.
12:30 - 12:35 0.08 DRILL C PROD1 Continue drilling to 12861'. Geo sees GR character & confirms
TD extension of 200' to 13050'.
12:35 - 13:40 1.08 DRILL P PROD1 Wiper trip clean to window. Continue wiping to 10600'. RBIH to
11115'.
13:40 - 13:50 0.17 DRILL P PROD1 Log & tie-into RA PIP tag & subtracted 2' from CTD.
13:50 - 14:25 0.58 DRILL P PROD1 RBIH clean to bottom.
14:25 - 14:30 0.08 DRILL C PROD1 Orient TF to 80R.
14:30 - 16:15 1.75 DRILL C PROD1 Drill to 13000' with 80R TF, 2.7/2.7bpm, 3000/3350psi &
105fph ave ROP.
16:15 - 16:30 0.25 DRILL C PROD1 Drill to 13020' with 130R TF, 2.7/2.7bpm, 3000/3350psi &
90fph ave ROP.
16:30 - 17:00 0.50 DRILL C PROD1 Orient & drill to TD @ 13050' with 30R TF, 2.7/2.7bpm,
3000/3350psi & 60fph ave ROP.
17:00 - 19:25 2.42 DRILL P PROD1 MAD pass to 11385'. Overpull thru 12440-340'. Continue
wiping to window. Log tie-in down from 11110', corr -1.0'
19:25 - 20:25 1.00 DRILL P PROD1 Wiper to TD. Set downs at 12380', 12450' and 12480' required
reaming. Tag TD at 13050'
20:25 - 21 :30 1.08 DRILL P PROD1 Wiper to window. Pu1l10-20k over thru 12440-12340' w/ MW
above 12370', Rest of wiper clean
21 :30 - 23:00 1.50 DRILL P PROD1 Flag at 10900' EOP. POOH 2.5/2600 circ to surface for liner
test
23:00 - 00:00 1.00 DRILL P PROD1 LD drilling BHA. Download res tool
1/26/2003 00:00 - 00:45 0.75 DRILL P PROD1 Fin download res tool. Fin LD BHA
00:45 - 01 :00 0.25 CASE P COMP RU to run liner
01 :00 - 01 :45 0.75 CASE N HMAN COMP WO BOT
01 :45 - 02:00 0.25 CASE P COMP Load Baker tools to floor
02:00 - 02: 15 0.25 CASE P COMP Safety mtg re: LSL test
02:15 - 03:45 1.50 CASE P COMP MU BOT shoe and ported sub, 10 jts 2-7/8" STL, LSL sub, 10
jts 3-3/16" TC11, XO, XN, 10' 3-1/2" pup, Deployment sleeve,
CTLRT (650')
03:45 - 04:15 0.50 CASE P COMP Cut 7' CT. Install BOT CTC. PT 35k, 3500 psi
04:15 - 05:20 1.08 CASE P COMP Circ 1.2/1120 while fill liner wI mud and est circ. Load wiper
dart. Displace 2.1/2.1/1640. Red rate to 0.8/960 prior to
Printed: 2/3/2003 12:2218 PM
)
')
BP EXpLoRATION
Operations Summary Report
Page 6 of10·
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date From-To Hours Task Code NPT Phase Description of Operations
1/26/2003 04: 15 - 05:20 1.08 CASE P COMP latchup at 52.2 bbls. LWP launched at 2100 psi. Incr rate to
1.8/1430. Saw press incr when plug in 2-7/8" at 1.8/1540.
LWP landed in ported sub at calc displ. SD pump, bleed off
press
05:20 - 06: 1 0 0.83 CASE P COMP Set back inj. RU and circ liner and annulus to FW
06:10 - 06:25 0.25 CASE P COMP Safety mtg re: LD liner
06:25 - 08:00 1.58 CASE P COMP LID BOT Deploy sleeve, CTLRT, XO, XN, 10' 3-1/2" pup, 10 jts
3-3/16" TC11, 10 jts 2-7/8" STL, LSL sub, shoe & ported sub.
Inspected LSL sub & LWP"" OK, wiper fins not damaged.
08:00 - 08:15 0.25 CASE P COMP Held PJSM on running liner assembly.
08:15 - 11 :00 2.75 CASE P COMP M/U float equipment, 56 jts 2-7/8" 6.16# L-80 STL liners, 2-7/8"
STL pups, LSL sub, 11 jts 3-3/16" 6.2# L-80 TC11 liners, XO,
'XN' nipple, 3-1/2" STL pups, BOT deployment sleeve &
CTLRT. M/U coil.
11 :00 - 13: 15 2.25 CASE P COMP RIH with liner on CT. Check up wt.... 41.5k, down wt - 20k. RIH
smoothly @ 50 fpm thru window. Continue RIH. Set down in
shale @ 12392'.
13:15 -14:15 1.00 CASE P COMP Work & wash from 12375' to 12650'. Continue RIH & set down
again @ 12950'. Continue working/wahing. See flag @ 12974'
(-32 correction). Tag TD solid @ 13082' CTD. P/U @ 47.5k.
RBIH & retag TD solid @ same depth. Correct depth to 13050'.
14:15 - 15:00 0.75 CASE P COMP Load & launch 5/8" phenolic ball. Set down 10k Ibs down on
CTLRT. Chase ball with 2.0/2.0bpm, 2150psi.Slow down @
40bbls away. Ball on seat @ 47.5bbls. Pressure up to 41 OOpsi
& release CTLRT. P/U @ 33k & confirm release.
15:00 - 17:30 2.50 CASE P COMP Displace well to 2% KCI @ 3.2/3.1 bpm/, 3350psi & ship back
used mud to MI. Getting plenty of solids back & plugging off the
out micromotion with +ve WHP. Meanwhile R/U Dowell
cementers.
17:30 - 18:00 0.50 CASE P COMP Continue circ hole @ 2.4/2.2bpm, 1000psi. Meanwhile cleanout
plugged out micromotion.
18:00 - 18:15 0.25 CEMT P COMP PJSM for cement job.
18: 15 - 18:30 0.25 CEMT P COMP Batch-up cement slurry.
18:30 - 18:45 0.25 CEMT P COMP Final circ parameters 2.0/1.7/800. PT DS 4000 psi. Load CT
w/23 bbls G cement w/latex 2.0/1.7/2000
18:45 - 19:25 0.67 CEMT P COMP Load wiper dart and displace w/ 26 bbls biozan and KCI. Out
MM plugged again-temp fix it in time to see returns diminished
to 2.6/2.1/1430 as cement turned the corner. Red rate to
1.8/1000 before latchup. Latched LWP at calc displ and
sheared at 3300 psi. Fin displ 2.1/1.8/1480. LWP bumped at
calc displ. Chk floats, ok. Unsting from liner at 32k. 20.9 bbls
circ'd around shoe
19:25 - 21 :20 1.92 CASE P COMP POOH at 0.6 bpm/400 psi while diluting 3 bbls excess (over the
top) cement w/ biozan. POOH to surf at reduced pump rate.
Teardown 'out' MM and found a piece of Hydril rubber causing
previous plugging probs
21 :20 - 21 :40 0.33 CASE P COMP LD CTLRT
21:40-22:10 0.50 EVAL P COMP MU 3.80" D331/motor/MHA
22:10 - 00:00 1.83 EVAL P COMP RIH w/ BHA #6
1/27/2003 00:00 - 00:30 0.50 EVAL P COMP Precautionary ream 4-1/2" liner 2.6/2.6/1350 while RIH 50'/min.
See flag at 10900' EOP (-30' corr). Tag TOL and stalled at
11045' (uncorrected CTD). TOL by pipe tally is 11017'
00:30 - 02:20 1.83 EVAL P COMP POOH to surf 2.8/1500 psi. Dump 100 bbls dirty water w/ max
Printed: 2/3/2003 12:22:18 PM
')
)
BP EXPLORA rrON
Operations Summary Report
Page 70f 1 0
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date From - To Hours Task Code NPT Phase . Description of Operations
1/27/2003 00:30 - 02:20 1.83 EVAL P CaMP density of 9.1 ppg
02:20 - 02:45 0.42 EVAL P CaMP LD milling assy
02:45 - 03: 15 0.50 EVAL P CaMP MU 2.30" mill on 2-1/8" motor. Load memory tools to floor
03:15 - 03:30 0.25 EVAL P CaMP Safety mtg re: source
03:30 - 04:00 0.50 EVAL P CaMP MU SWS memory GR/CNLlCCL, MHA
04:00 - 06:15 2.25 EVAL P CaMP MU 66 jts CSH workstring
06: 15 - 06:30 0.25 EVAL P CaMP RIH w/ CT. Plugged off carrier with fines. Press up to 1400 psi
06:30 - 07:00 0.50 EVAL N DPRB CaMP POOH w/ CT. Set back injector. PJSM. Bleed off pressure
trapped below double check valves using 3/4" x 20" rod. LID
upper MHA & R/U circ head.
07:00 - 07:30 0.50 EVAL N DPRB CaMP Pressure up to 2500psi to establish circ - no luck. Bleed off
pressure. Drop 5/8" ball to open circ sub below 1-1/4" CS
Hydril.
07:30 - 08:00 0.50 EVAL N DPRB CaMP Open up circ sub with 2600psi & establish circ @ 3.0bpm &
2850psi. Review situation with town crew & decide to POOH
CSH, LID logging tools & mill/motor, RBIH CSH & pump/flush
@ max rate, POOH CSH & RBIH with logging tools &
mill/motor,
08:00 - 08: 15 0.25 EVAL N DPRB CaMP Held PJSM for R/B & RBIH CSH.
08:15-10:15 2.00 EVAL N DPRB CaMP R/B 33 stands of 1-1/4" CS Hydril & LID logging tools &
mill/motor. Found motor packed with fine scale/rust.
10:15-11:00 0.75 EVAL N DPRB CaMP M/U 2-1/4" nozzle (15/16" bore) to CSH & RBIH with 33 stands
of 1-1/4" CSH.
11 :00 - 11 :45 0.75 EVAL N DPRB CaMP R/U circ head & pump thru CSH @ 3.8bpm/3500psi.
11 :45 - 12:00 0.25 EVAL P CaMP Nordic crew change & PJSM for R/B CSH. Cmt 2200 psi
12:00 - 12:45 0.75 EVAL N DPRB CaMP POOH & R/B CSH.
12:45 - 13:00 0.25 EVAL N DPRB CaMP PJSM on RIH CHS tbg, CNL tools & motor/mill.
13:00 - 14:30 1.50 EVAL N DPRB CaMP M/U 2.30" mill on 2-1/8" motor. M/U SWS memory
GR/CNLlCCL tool & lower MHA. M/U 33 stands of 1-1/4" CSH
tbg & upper MHA. P/U injector.
14:30 -15:45 1.25 EVAL P CaMP RIH BHA#9 on CT to 9600'. Meanwhile start pumping 16bbls of
fresh flopro perf pill down @ 0.5bpm/360psi.
15:45 - 17:40 1.92 EVAL P CaMP Log down from 9600' @ 30fpm.
17:40 - 19:40 2.00 EVAL P CaMP Tag PBD at 13044' CTD. PUH 40k logging 30fpm while
leaving 16bbls fresh high LSRV Flo Pro mud in liner.
19:40 - 20:50 1 .17 EV AL P CaMP POOH
20:50 - 21 :00 0.17 EVAL P CaMP Safety mtg re: CSH
21 :00 - 22:00 1.00 EVAL P CaMP LD single, SB 32 CSH doubles
22:00 - 22: 1 0 0.17 EVAL P CaMP Safety mtg re: source
22:10 - 22:30 0.33 EVAL P CaMP LD single, LD CNL tools and load out
22:30 - 22:40 0.17 EVAL P CaMP Safety mtg re: KB Packer
22:40 - 23:05 0.42 EVAL P CaMP MU 4-1/2" BOT KB packer assy w/1 jt PH6
23:05 - 00:00 0.92 EVAL P CaMP RIH w/ BHA #10 Phz 1
1/28/2003 00:00 - 01 :00 1.00 CASE P CaMP Continue RIH w L TP, Phz 1
01:00 - 01:10 0.17 CASE P CaMP Park at 10900'. Pressure up on wellbore to 2000 psi and
slowly lost 220 psi in 7 min. No change to IA (nearly full, but
on -35 psi vac). Bleed off press
01: 10 - 01 :20 0.17 CASE P CaMP Wt chk 40.2k. RIH 21.6k 0.5/60. See TaL at 11045' CTD, SD
pump w/ 300 psi. Stack wt and see locator tag at 11051' and
set 1 Ok to 11055'. PUH 41 k to 10001' ball drop
01 :20 - 02:00 0.67 CASE P CaMP Load 5/8" steel ball and circ onto seat
02:00 - 02:45 0.75 CASE P CaMP RIH and sting into PB and stack 10k wt at 11055'. Find hard
tag (locator) at 11051.5'. Unsting 48k, seals dragging. Sting
Printed: 2/3/2003 12:22:18 PM
')
)
BPEXPLORATION
Operations Sum maryReport
Page 8öf 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date F fom- To Hours Task Code NPT Phase Description, of Operations
1/28/2003 02:00 - 02:45 0.75 CASE P COMP back in and park 1.5' off locator. Press up to 1000 psi to set
slips. Press up BS to 2200 psi and slowly lost 500 psi in 10
min, no change to IA or FLP. Bleed off press. Stack 10k
more. Press BS to 2000 psi and lost 225 psi in 7 min. No
surface leaks. Bleed off press. Press up on CT to 2010 psi to
shear release. PUH 43k and left top of KB packer at 11000'.
Assume a leak somewhere else in wellbore
02:45 - 04:40 1.92 CASE P COMP POOH w/ setting assy while cuss 'n discuss. Load perf guns in
pipeshed
04:40 - 05:00 0.33 CASE P COMP LD setting tool. Lost 4 seal rings on bottom of stinger. Lost 25
bbls on trip
05:00 - 05:30 0.50 CASE P COMP RU Little Red. FilllA with 5 bbls diesel (to apply positive press)
and SI at 450 psi
05:30 - 06: 15 0.75 CASE P COMP Fill wellbore and pressure test to 2000 psi, IA at 435 psi. After
40 min, WHP 1180, IA 330. Bleed off press. IA at 310 psi
06: 15 - 07:00 0.75 CASE N DPRB COMP MU Baker GH seal assy on 1 jt of PH6 tbg. M/U injector.
07:00 - 08:35 1.58 CASE N DPRB COMP RIH Baker GH seal assy on CT to 10950'.
08:35 - 08:45 0.17 CASE N DPRB COMP Up wt at 10950' = 38K, Dwn wt. = 19.5K. RIH @ 30fpm,
0.2bpm. Sting seal assy into L TP @ 11041' CTD. Set down
10K @ 11044.9' CTD.
08:45 - 09:00 0.25 CASE N DPRB COMP WHP/CTP/IAP/OAP @ 0/45/325/51 psi @ onset of test. Press
up the back side to 1000psi - WHP/CTP/IAP/OAP @
1000/45/355/51 psi. Press up CT to 2000psi -
WHP/CTP/IAP/OAP @ 924/2023/352/51 psi. After 5mins,
~, WHP/CTP/IAP/OAP @ 891/2016/347/51 psi.
09:00 - 09:15 0.25 CASE N DPRB COMP Press up the back side to 2000psi - WHP/CTP/IAP/OAP @
2000/2120/396/51 psi. After 5mins, WHP/CTP/IAP/OAP @
1788/2103/383/51 psi. Review forward plan with town & decide
to retrieve the L TP, perforate & rerun L TP with a spacer p/jt.
09:15 -11:15 2.00 CASE N DPRB COMP POOH Baker GH seal assy.
11 : 15 - 11: 30 0.25 CASE N DPRB COMP OOH. LID Baker GH seal assy.
11:30 -12:00 0.50 FISH N DPRB COMP M/U Baker "GS" retrieving spear, up jar & MHA. M/U injector.
12:00 - 13:35 1.58 FISH N DPRB COMP RIH Baker "GS" spear assy on CT to 10950'.
13:35 - 13:55 0.33 FISH N DPRB COMP Up wt at 10950' = 38k, Dwn wt = 18.5k. Tag L TP @ 11045'.
Set down 10k @ 11050'. Latch into L TP "GS" profile & jar on
pkr slips 9 times. Pull L TP free with 68k max pull.
13:55 - 15:35 1.67 FISH N DPRB COMP POOH with L TP pumping across the wellhead to keep hole full.
15:35 - 16:00 0.42 FISH N DPRB COMP LID "GS" spear BHA & L TP assy. Inspect seals & slips - in
excellent condition.
16:00 - 16:30 0.50 PERF P COMP R/U to run guns. R/U safety jt.
16:30 - 16:45 0.25 PERF P COMP Held PJSM for running perf guns.
16:45 -18:50 2.08 PERF P COMP M/U 38 2" SWS perf guns & blanks with HDF-firing head & 18
2" SWS perf guns & blanks with CBF-firing head.
18:50 -19:00 0.17 PERF P COMP Safety mtg re: CSH
19:00 - 19:40 0.67 PERF P COMP MU 15 stds CSH workstring
19:40 - 21 :45 2.08 PERF P COMP RIH w/ perf guns
21 :45 - 21 :55 0.17 PERF P COMP Tag PBD at 13045' CTD and confirm. Corr depth to 13011'.
Park at set depth
21:55 - 22:10 0.25 PERF P COMP Safety mtg re: HDF perfing
22: 1 0 - 22:30 0.33 PERF P COMP Pressure wellbore to 2600 psi and pump occasionally at less
than 0.1 bpm to maintain press for 8 min. Bleed off press.
Guns were set to fire 8 min after bleed off. Sonolog had a
questionable mark at 3 min. Wait for 10 min and no further
Printed: 2/3/2003 12:22:18 PM
)
')
BP EXPLORATION
OperationsSurnmary Report
Page 9 of1 0
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date From - To Hours Task Code NPT Phase Description of Operations
1/28/2003 22:10 - 22:30 0.33 PERF P COMP indications. Pump down well to verified fired
Perforated wI 2" guns at 4 spf
12220-12330'
12410-12540'
12610-12710'
12840-13010'
22:30 - 22:45 0.25 PERF P COMP Attempt to PUH and were temporarily immobile for 4 cycles at
max pull. Get free, PUH to next set depth
22:45 - 23:25 0.67 PERF P COMP Pump 12 bbls fresh mud, load 5/8" steel ball, pump 8 bbls
fresh mud, then displace wI KCI 2.3/2.1/2220 to seat. Ball
seat sheared at 2950 psi, good indicators
Perforated wI 2" guns at 4 spf
11490-11550'
11580-1171 0'
11770-11870'
23:25 - 00:00 0.58 PERF P COMP POOH wI perf guns
1/29/2003 00:00 - 01 :25 1.42 PERF P COMP Continue POOH wI perf guns. Lost 12 extra bbls over normal
fill
01 :25 - 02:05 0.67 PERF P COMP Standback CSH
02:05 - 02:20 0.25 PERF P COMP Safety mtg re: perf guns
02:20 - 06:30 4.17 PERF P COMP LD perf guns-all shots fired
06:30 - 07:00 0.50 PERF P COMP Load out perf guns
07:00 - 07:15 0.25 CASE P COMP Held PJSM for M/U & RIH L TP.
07:15 - 07:50 0.58 CASE P COMP M/U BHA # 14 with Bkr seal assy, 10' 2-7/8" tbg P/jt, KB
Packer, GH R/Tool, 1 jt of PH6 tbg & MHA. P/U injector.
07:50 - 09:40 1.83 CASE P COMP RIH with Baker 4.5" KB L TP BHA #14 to 10950'.
09:40 - 09:50 0.17 CASE P COMP Up wt at 10950' = 41k, Dwn wt = 21k. Sting seal assy into
deployment sleeve @ 11043.7'. Set down 10k @ 11053.2'.
Sting out with seal assy & pull to ball drop position @ 11024.6'.
09:50 - 10:30 0.67 CASE P COMP Launch 5/8" steel ball & chase @ 2.1 bpm, 1098psi. Slow down
to 0.5bpm @ 35bbls away. Ball on seat @ 39.9bbls. SID pump
& RBIH. Set down 10k @ 11053'. P/U to 41k @ 11043.3'. PUH
1.5' off btm to 11041.8'. Pump @ 0.6bpm to set slips - observe
pressure bleed off from 2350psi. SID pump & observe quick
pressure bleed off. Attempt to pressure back - bleeding off
even faster. Stack back 12k & P/U - Pkr moving freely.
10:30 - 10:45 0.25 CASE N DFAL COMP Attempt to P/Test pkr @ 2000psi - Lost 800psi in 3mins with
annulus & CT communicating. Suspect something may have
sheared during slips setting linking the CT to the annulus.
10:45 - 13:10 2.42 CASE N DFAL COMP POOH with L TP assy. 30k O/pull @ 10910'. Slack-off - no
stack. Continue POOH with L TP assy.
13:10 -13:30 0.33 CASE N DFAL COMP OOH. UD Baker R/Tool & L TP. Observe that the burst disc
prematurely ruptured - Suppose to rupture @ 5150psi. Also
observed that the L TP slips have been actuated before burst
disc ruture. Packer & slips look clean.
13:30 -15:30 2.00 CASE N DFAL COMP Baker rep run to shop to P/U new burst disc, L TP with new
tie-back sleeve & R/T 001.
15:30 - 15:45 0.25 CASE N DFAL COMP Held PJSM for M/U & RIH L TP.
15:45 - 16:20 0.58 CASE N DFAL COMP M/U BHA # 15 with Bkr seal assy, 10' 2-7/8" tbg P/jt, KB
Packer, tie-back sleeve, CTLRT, 1 jt of PH6 tbg & MHA. P/U
injector.
16:20-18:15 1.92 CASE N DFAL COMP RIH with Baker 4.5" KB L TP BHA #15 to 10900'.
18:15 - 18:30 0.25 CASE N DFAL COMP Up wt at 10900' = 41 k, Dwn wt = 21 k. Sting seal assy into
Printed: 2/3/2003 12:22: 18 PM
)
)
BP EXPLORATiON
Operati.ons SummaryR.eport
Page 10 of 10
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Date From -To Hours Task Code NPT Phase Description of Operations
1/29/2003 18:15 - 18:30 0.25 CASE N DFAL COMP deployment sleeve @ 11045.5'. Set down 10k @ 11052.9'.
PUH to ball drop 41 k
18:30 -19:15 0.75 CASE P COMP Load 1/2" steel ball and circ to seat. RIH and see locator tag at
11049' CTD. Set 10k. PUH 41k until locator was 2' above
TOL. Pressure up to 1800 psi to set elements. Slack off to
verify set, bleed off press
19:15 - 19:40 0.42 CASE P COMP PT wellbore to 2000 psi for 5 min and lost 20 psi (probably to
leaking CT isolation valve). Bleed off press. Pressure up on
ball seat and shear released at 2300 psi. Top of BOT second
deployment sleeve set at 10984.3' ELMD
19:40 - 21 :55 2.25 CASE P COMP POOH w/ setting tool. Adjust reel drive bushings/pins 10 min.
Displace top 2000' of wellbore w/ MeOH
21 :55 - 22:20 0.42 CASE P COMP LD setting tool and load out
22:20 - 00:00 1.67 RIGD P COMP Blow back CT w/ air. Blow down hardline to flowback tank.
Vac pits, tanks. ND BOPE, NU tree cap and PT. Rig released
2400 hrs 1/29/2003
Printed: 2/3/2003 1222:18 PM
η
;
"
)
dCb7-dS't
28-Jan-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well 15-158
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey: 11,042.38' MD
Window / Kickoff Survey 11,069.00' MD (if applicable)
Projected Survey: 13,050.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
MAR 2 6 2003
AJasi<a or; & Gas Cons. Commillion
Anctuoge
Sperry-Sun Drilling Services
North Slope Alaska
8PXA
15-158
-~
Job No. AKMW30011, Surveyed: 25 January, 2003
Survey Report
6 March, 2003
Your Ref: API 500292069102
Surface Coordinates: 5959050.59 N, 677510.01 E (70017' 37.0523" N, 148033' 45.7226" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing: 57.48ft above Mean Sea Level
~
spe............y-5ul'1
DRIL&.:..'rN·G' 'SERVIc:efs
A Halliburton Company
Survey Ref: svy3980
Sperry-Sun Drilling Services
Survey Report for 15-15B
Your Ref: API 500292069102
Job No. AKMW30011, Surveyed: 25 January, 2003
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1OOft)
11042.38 80.250 174.870 8853.64 8911.12 4827.61 8 2191.19 E 5954276.07 N 679814.59 E -683.99 Tie On Point
-11069.00 82.720 174.920 8857.58 8915.06 . 4853.838 2193.53 E 5954249.91 N 679817.55 E 9.281 -678.56 Window Point
11098.93 83.960 180.410 8861.06 8918.54 4883.52 8 2194.74 E 5954220.26 N 679819.46 E 18.684 -671.04
11130.28 88.990 186.140 8862.99 8920.47 4914.748 2192.95 E 5954189.01 N 679818.41 E 24.290 -660.20
11165.63 87.660 192.570 8864.02 8921.50 4949.58 8 2187.21 E 5954154.04 N 679813.49 E 18.567 -644.52
11202.90 85.730 200.660 8866.17 8923.65 4985.21 8 2176.58 E 5954118.17 N 679803.71 E 22.279 -623.94 ---
11237.80 85.990 209.830 8868.70 8926.18 5016.66 8 2161.75 E 5954086.38 N 679789.63 E 26.217 -600.57
11271.53 83.170 216.700 8871 .89 8929.37 5044.728 2143.35 E 5954057.89 N 679771.89 E 21.931 -574.77
11308.80 83.000 223.040 8876.38 8933.86 5073.108 2119.65 E 5954028.96 N 679748.87 E 16.893 -543.80
11344.73 83.480 232.970 8880.62 8938.10 5096.94 8 2093.16 E 5954004.50 N 679722.95 E 27.477 -511.50
11374.73 84.930 238.730 8883.65 8941 .13 5113.698 2068.47 E 5953987.18 N 679698.66 E 19.703 -482.99
11408.05 83.700 245.600 8886.95 8944.43 5129.168 2039.17 E 5953971.02 N 679669.74 E 20.846 -450.45
11440.42 83.700 249.830 8890.51 8947.99 5141.368 2009.41 E 5953958.12 N 679640.27 E 12.989 -418.42
11471.67 83.610 251.940 8893.96 8951.44 5151.538 1980.06 E 5953947.26 N 679611.17 E 6.717 -387.38
11504.58 83.790 257.230 8897.58 8955.06 5160.22 8 1948.54 E 5953937.82 N 679579.86 E 15.986 -354.70
11534.92 84.670 259.170 8900.63 8958.11 5166.39 8 1918.99 E 5953930.96 N 679550.47 E 6.992 -324.64
11578.60 86.780 264.630 8903.88 8961.36 5172.528 1875.89 E 5953923.81 N 679507.52 E 13.368 -281.62
11614.28 87.840 268.330 8905.56 8963.04 5174.71 8 1840.32 E 5953920.78 N 679472.02 E 10.776 -246.97
11648.08 88.190 272.910 8906.73 8964.21 5174.348 1806.55 E 5953920.35 N 679438.25 E 13.582 -214.78
11687.30 89.250 277.490 8907.61 8965.09 5170.798 1767.51 E 5953922.98 N 679399.14 E 11.983 -178.49
11717.60 88.990 281.020 8908.07 8965.55 5165.92 8 1737.62 E 5953927.14 N 679369.13 E 11.680 -151.32
11748.92 89.600 278.370 8908.46 8965.94 5160.65 8 1706.75 E 5953931.69 N 679338.15 E 8.682 -123.35
11786.73 90.660 276.080 8908.37 8965.85 5155.898 1669.24 E 5953935.55 N 679300.54 E 6.674 -88.87 ---
11819.85 90.660 272.380 8907.99 8965.47 5153.458 1636.22 E 5953937.22 N 679267.47 E 11.171 -58.00
11855.90 91.390 268.530 8907.35 8964.83 5153.168 1600.19 E 5953936.65 N 679231.44 E 10.868 -23.63
11899.73 88.900 263.920 8907.24 8964.72 5156.05 8 1556.47 E 5953932.7 4 N 679187.80 E 11 .953 19.03
11940. 1 5 88.990 260.930 8907.98 8965.46 5161.378 1516.41 E 5953926.46 N 679147.88 E 7.399 58.89
12000.85 88.210 254.940 8909.46 8966.94 5174.058 1457.10 E 5953912.39 N 679088.88 E 9.949 119.32
12034.60 88.630 252.120 8910.39 8967.87 5183.628 1424.75 E 5953902.06 N 679056.77 E 8.445 153.05
12070.20 89.250 248.950 8911.05 8968.53 5195.48 8 1391.19 E 5953889.42 N 679023.50 E 9.072 188.61
12099.00 90.040 245.950 8911.23 8968.71 5206.52 8 1364.60 E 5953877.75 N 678997.18 E 10.772 217.27
12137.03 92.510 243.840 8910.39 8967.87 5222.65 8 1330.17 E 5953860.81 N 678963.14 E 8.541 254.90
12172.95 92.250 248.420 8908.89 8966.37 5237.178 1297.36 E 5953845.52 N 678930.68 E 12.760 290.53
12206.25 91.280 252.820 8907.87 8965.35 5248.21 8 1265.97 E 5953833.74 N 678899.56 E 13.524 323.77
12237.85 89.430 253.170 8907.67 8965.15 5257.458 1235.76 E 5953823.79 N 678869.57 E 5.958 355.37
6 March, 2003 - 14:09 Page 2 of 4 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for 15-158
Your Ref: API 500292069102
Job No. AKMW30011, Surveyed: 25 January, 2003
8PXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1 OOft)
12274.65 91.980 256.170 8907.22 8964.70 5267.18 S 1200.27 E 5953813.23 N 678834.33 E 10.698 392.15
12324.83 92.780 263.040 8905.13 8962.61 5276.22 S 1150.99 E 5953803.02 N 678785.28 E 13.771 441.92
12357.95 93.570 267.270 8903.30 8960.78 5279.01 S 1118.05 E 5953799.45 N 678752.41 E 12.973 474.24
12387.90 93.130 269.740 8901.55 8959.03 5279.79 S 1088.16 E 5953797.97 N 678722.55 E 8.363 503.05
12410.00 90.750 269.030 8900.80 8958.28 5280.03 S 1066.08 E 5953797.21 N 678700.48 E 11 .238 524.24
12441.07 88.190 270.620 8901.09 8958.57 5280.12 S 1035.01 E 5953796.38 N 678669.42 E 9.699 553.97 ,.~
12479.50 87.400 275.910 8902.57 8960.05 5277.94 S 996.69 E 5953797.66 N 678631.06 E 13.908 589.98
12512.82 87.220 279.780 8904.13 8961.61 5273.39 S 963.72 E 5953801.42 N 678597.99 E 11.614 620.18
12542.52 88.630 280.310 8905.21 8962.69 5268.22 S 934.50 E 5953805.91 N 678568.65 E 5.071 646.61
12588.04 91.010 278.020 8905.35 8962.83 5260.97 S 889.56 E 5953812.10 N 678523.56 E 7.255 687.46
12620.47 90.750 274.500 8904.85 8962.33 5257.43 S 857.34 E 5953814.87 N 678491.26 E 10.882 717.25
12650.45 88.990 270.800 8904.92 8962.40 5256.05 S 827.39 E 5953815.55 N 678461.29 E 13.666 745.48
12680.22 88.280 268.860 8905.63 8963.11 5256.14 S 797.64 E 5953814.76 N 678431.55 E 6.938 773.96
12721 .15 87.310 263.920 8907.20 8964.68 5258.71 S 756.83 E 5953811 .22 N 678390.81 E 12.291 813.74
12759.25 87.750 260.580 8908.85 8966.33 5263.84 S 719.12 E 5953805.20 N 678353.23 E 8.834 851.30
12792.04 88.630 261.280 8909.88 8967.36 5269.01 S 686.75 E 5953799.27 N 678321.00 E 3.429 883.76
12826.07 88.900 257.930 8910.61 8968.09 5275.15 S 653.30 E 5953792.34 N 678287.70 E 9.874 917.55
12863.02 91.980 257.930 8910.33 8967.81 5282.87 S 617.17 E 5953783.77 N 678251.76 E 8.336 954.36
12899.54 91.280 260.930 8909.29 8966.77 5289.57 S 581.29 E 5953776.23 N 678216.05 E 8.432 990.63
12930.79 90.680 265.390 8908.76 8966.24 5293.29 S 550.27 E 5953771.77 N 678185.13 E 14.398 1021.38
12969.27 92.070 269.910 8907.83 8965.31 5294.86 S 511.85 E 5953769.29 N 678146.75 E 12.286 1058.59
13004.59 91.450 275.380 8906.75 8964.23 5293.24 S 476.59 E 5953770.09 N 678111.47 E 15.579 1091.82
13027.59 90.660 277.140 8906.32 8963.80 5290.73 S 453.74 E 5953772.05 N 678088.56 E 8.386 1112.95 ~
13050.00 90.660 277.140 8906.07 8963.55 5287.94 S 431.50 E 5953774.31 N 678066.26 E 0.000 1133.40 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 253.000° (True).
Magnetic Declination at Surface is 26.041°(18-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 13050.00ft.,
The Bottom Hole Displacement is 5305.52ft., in the Direction of 175.335° (True).
6 March, 2003 - 14:09
Page 3 of4
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for 15-158
Your Ref: API 500292069102
Job No. AKMW30011, Surveyed: 25 January, 2003
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11042.38
11069.00
13050.00
8911.12
8915.06
8963.55
4827.61 S
4853.83 S
5287.94 S
2191.19 E
2193.53 E
431.50 E
Tie On Point
Window Point
Projected Survey
~
Survey tool program for 15-158
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
10547.98
0.00 10547.98
8649.88 13050.00
8649.88 BP High Accuracy Gyro - AK-1 BP _HG(15-15)
8963.55 MWD Magnetic(15-15A)
~
6 March, 2003 - 14:09
Page 4 of4
DrillQuest 3.03.02.002
)
')
Well:
Field:
API:
Permit:
Date
15-15B
Prudhoe Bay Unit
50-029-20691-02
202-258
Accept:
Spud:
Release:
Rig:
01/21/03
01/23/03
01/29/03
Nordic #1
PRE-RIG WORK
12125/02
VALVE SHOP TESTED THE MV, SV, AND WV TO 3500 PSI FOR 15 MIN. OK.
12126/02
WELL SHUT IN ON ARRIVAL. DRIFT WI 3-318" DG TO 10,727' SLM. CALIPER TUBING FROM 10,700' TO
SURFACE. WELL LEFT SHUT IN.
01/02/03
PPPOT-T PASSED TO 5000 PSI. PPPOT-IC PASSED TO 3200 PSI. ALL LDS ON BOTH HANGERS
FUNCTIONED OK.
T/I/O=21 001480/150. WELL IS SI. IA FL @ 5880' (258 BBLS). TBG FL @ 9572' (222 BBLS).
01/04/03
PULLED S/O GLV FRO STA. # 3. PULLED LGLV FROM STA. # 2 & 1. SET DGLV'S IN STA. # 1, 2, & 3
MITIA TO 3000 PSI (GOOD TEST). LEFT WELL SHUT IN.
01/10/03
Dff WI 3 1/2 GS 3.70 DUMMY WHIPSTOCK SD @ 10607' SLM. UNABLE TO WORK PAST. POOH.
RDMO. LEFT WELL SHUT IN.
01/17/03
KILL WELL AND RIH WITH MOTOR AND 3.8" PARABOLIC MILL TO 11310'. SEE NO MOTOR WORK OR
OBSTRUCTIONS. OPEN CIRC SUB AND POOH @ 80%. RIH WI 25.5' X 3.646" DMY WHIPSTOCK DRIFT TO
11280' (NO RESTRICTIONS). RIH WI PDS GR/CCL. LOG FROM 11280 UP TO 9500 AT 45 FPM. POH AND
REKILL WELL WITH 2% KCL. OOH. VERIFY DATA.
01/18/03
RIH AND SET CIBP WITH CENTER OF ELEMENT AT 11260 CTMD, TOP OF CIBP @ 11259.5'. DEPTH
REFERENCED TO PDS LOG DATED 1/18/03 - TIED INTO SWS BORAX LOG 5/15/00. FIP TOP 2200' WI 60/40
METH. TEST CIBP TO 2500 PSI (GOOD TEST). JOB COMPLETE. RDMO.
)
)
BPEXPLORATION
Operations Summa.ry Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date·
Page 1 of 10
Start: 1/21/2003
Rig Release: 1/29/2003.
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
From-To Hours Task Code. NPT Phase
Description of Operations
1/21/2003
00:00 - 02:45 2.75 MOB N
02:45 - 03:00 0.25 MOB P
03:00 - 07:00 4.00 MOB P
07:00 - 12:00 5.00 MOB P
12:00 -15:00 3.00 MOB P
15:00 - 19:30 4.50 MOB N
19:30 - 19:50 0.33 MOB P
19:50 - 20:30 0.67 MOB P
20:30 - 21 :30 1.00 P
21 :30 - 00:00 2.50 P
1/22/2003 00:00 - 04:00 4.00 P
04:00 - 04:30 0.50 P
04:30 - 05: 15 0.75 STWHIP N
05:15 - 05:30 0.25 STWHIP P
05:30 - 06:45 1.25 STWHIP P
06:45 - 07:15 0.50 STWHIP P
07:15 - 08:30 1.25 STWHIP P
08:30 - 08:45 0.25 STWHIP P
08:45 - 09: 15 0.50 STWHIP P
09:15 - 12:00 2.75 STWHIP P
12:00 -12:15
0.25 STWHIP P
12:15 - 12:45
0.50 STWHIP P
12:45 - 15:45
3.00 STWHIP P
15:45 - 16:15
0.50 STWHIP P
16:15 - 17:00
0.75 STWHIP P
WAIT PRE
PRE
PRE
PRE
PRE
WAIT PRE
PRE
PRE
PRE
PRE
PRE
PRE
WAIT WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
Wating for DS-15 site to be prepped after storm, snow removal
has delayed the pad prep.
PJSM: Pre Rig move safety meeting with crew, security
Move rig from DS-14 to DS-15. Derrick down.
Spot rig in front of 15-15A. Inspect Pad. Level pad and raise
wind walls. Meanwhile DSM blind flowline, after servicing
valves the line still builds up to 890psi.
Tilt rams. P/U injector & gooseneck. C/O packott & stab CT.
Begin Standby. Continue W.O. DSM to finish blinding 15-15
flowline which has a leaking grove valve.
Safety mtg re: move over tree
Move rig over tree and set down. Accept rig @ 20:30 Hrs on
1/21/2003.
ND tree cap. NU BOPE
Test BOPE. Witness waived by AOGCC
MIRU cuttings box/berm, MU hardline to flowback tank and PT
Spot misc equipment
Finish initial BOPE test
Prespud mtg
Fill pits with KCI/bio. Check well for press-85 psi. Bleed to
zero. IA 15, OA 20
WO WI!
Load 2 RA tags in WS. TOWS to RA tag = 8.9'.
MU WI! CTC. Load WS in pipeshed
Cut coil. Install Weatherford Slip CTC. Pull test to 35k.
Circulate & fill CT with KCL water. PfTest CTC to 3500psi.
PfTest inner reel valve to 3500psi.
Held pre-operations safety meeting. Reviewed well plan,
potential hazards & BHA M/U procedures.
M/U whipstock setting BHA # 1 with WII LSX whipstock, setting
tool & Sperry memory ESS tool. Check swivel jt - OK. M/U
MHA. Stab injector on well.
RIH with BHA #1 taking returns to tiger tank. Wt check @
11000': P/U = 45k & S/O = 25k. Continue RIH BHA#1 & lightly
tag the CIBP @ 11300'. P/U & retag @ same depth. Correct up
depth (11297') to the ELM of 11260'.
WEXIT PUH to 11073' & postion for TOWS @ 11060' (TOWS to
BOWS = 13.07').
WEXIT Load 5/8" steel ball. Launch ball into CT & chase ball @ 2 bpm,
600psi. Slow to 0.5bpm & chase ball to seat @ 44bbls away.
Pressure up to 2500psi to shear tool, saw little pressure drop
before building back up to 4500psi (1/16" weep hole &
bio-KCL). Wait for ESS tool to record orientation. Set down wt
& confirm whipstock set. P/U with 44k.
WEXIT POOH whipstock setting BHA #1 circ @ 0.5bpm/4000psi.
Continue taking returns to tiger tank due to FP fluid tripping
LEL alarms. POOH from 6000' filling hole from the backside.
WEXIT OOH. UO whipstock setting BHA#1 & recover 5/8 ball. Check
shear rod - OK. Meanwhile observe that ESS tool did not
record orientation due to instrument failure. Review with town &
proceed as per plan.
WEXIT MlU window milling BHA # 2 with HCC DSM, diamond string
reamer, WI! straight motor, MHA & 2 jts of PH6 tbg. Stab
Printed: 21312003 12:22:18 PM
, ,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
')
)
BP EXPLORATION
Operations Summary Report
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From - To Hours Task Code NPT Phase
1/22/2003
16:15 -17:00
17:00 - 18:50
18:50 - 19:25
19:25 - 20:20
1/23/2003
20:20 - 21 :35
21 :35 - 22:30
22:30 - 23:40
23:40 - 00:00
00:00 - 02:05
02:05 - 02:30
02:30 - 04:25
04:25 - 04:45
04:45 - 05:30
05:30 - 06:25
06:25 - 08: 15
08: 15 - 08:25
08:25 - 09:00
09:00 - 09:45
09:45 - 09:50
09:50 -10:15
10:15 -10:40
10:40 - 10:50
10:50 - 11 :05
11 :05 - 11 :55
0.75 STWHIP P
1.83 STWHIP P
0.58 STWHIP P
0.92 STWHIP P
1.25 STWHIP P
0.92 STWHIP P
1.17 STWHIP P
0.33 STWHIP P
2.08 STWHIP P
0.42 STWHIP P
1.92 STWHIP P
0.33 STWHIP P
0.75 DRILL P
0.92 DRILL P
1.83 DRILL P
0.17 DRILL P
0.58 DRILL P
0.75 DRILL P
0.08 DRILL P
0.42 DRILL P
0.42 DRILL P
0.17 DRILL P
0.25 DRILL P
0.83 DRILL P
0.42 DRILL P
0.25 DRILL P
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 2 of 10
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
Description of Operations
injector on well.
RIH with BHA #2 taking returns to tiger tank.
Tag WS at 11062.5' CTD. PUH 53k (pinch pt) and start pump
2.7/1430. RIH and first motor work at 11059.0' CTD. Corr to
11060.0' and flag CT
Mill window from 11060.0' 2.5/1340. Bleed IA from 800 to 40
psi
11061.0'
11062.0'
11063.0'
11064.0-11064.5'
Mill window from 11064.5'-11068.0'. Drill open hole from
11 068-11 080'
Ream window area and dry tag, clean
POOH for drilling assy
LD milling BHA. Mill and SR both 3.80" w/ very little wear-4th
well for dia SR
MU drilling BHA
Install DS CTC. PT @ 3500 psi, 35k ,
RIH with BHA #3. SHT MWD & orienter - OK. Continue RIH to
11000'. Wt check: Up wt = 47k, Dwn wt = 21k. Run thru window
with pumps down & tag btm @ 11115'. Correct depth to 11080'.
Meanwhile start swapping well to rebuild 8.6ppg, 12# K-G, 3%
L-T flo-pro mud.
Orient TF to 70R. Observe a 1 ftvd discrepancy b/w Compass &
Geotrack. Consult BHI town team & agree to tie into Compass
values.
Begin drilling build/turn section with 70R TF, 2.7/2.7bpm,
3200/3550psi & 55fph ave ROP. Drilled to 11123'. Inclina .
coming up > 82degs - thus W/S was set in right dir on.
Orient & drill to 11171' with 95-100R TF, 2.7/2. m,
2950/3450psi & 708fph ave ROP.
Orient & drill to 11177' with 95-100 ,2.7/2.7bpm,
3150/3450psi & 60fph ave RO~ ave new mud around. TF
flopping.
Orient TF to 90R.
Drill to 11219' 90R TF, 2.7/2.7bpm, 3150/3450psi &
100fph av OP.
Drill 1230' with 90-95R TF, 2.7/2.7bpm, 3150/3450psi &
ph ave ROP.
Wiper trip to window. Clean hole. Pull up to 10920' for tie-in
log.
Log GR & tie-in with shale marker @ 10870' using geology
PDC log (12120/1998CNL). Log RA Pip tag. Added 9' to CTD.
Corrected depths are: TOWSrrOW = 11068', BOW = 11076',
RA PIP Tag = 11077', BOWS = 11081'.
RBIH clean to TD tagged @ 11239'.
Orient TF to 90R.
Drill to 11260' with 90R TF, 2.7/2. 7bpm, 3000/3700psi & 65fph
ave ROP.
Drill to 11282' with 95-100R TF, 2.7/2.7bpm, 3000/3300psi &
50fph ave ROP.
Orient TF to 80R.
Printed: 21312003 12:22:18 PM
Legal Well Name:
Com mon Well Name:
Event Name:
Contractor Name:
Rig Name:
, ,
Date
. .. ..... .
, '
BP EXPL-ORA TION
. . ...., .
. . . . ..
Operat:ions~uJl1mary RelJ<ir1:'
.,,)
15-15A
15-15A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
)
A
Page€) of to
Start: 1/21/2003
Rig Release: 1/29/2003
Rig Number:
Spud Date: 12/22/1981
End: 1/29/2003
From ~.To< . Hours Task Code NPT ,Phase ·
',' ,',. ...... ...
. . ... ..... . ..... .. .. .
',. D~scriþtlonof bperations
1/26/2003
04: 15 - 05:20
05:20 - 06:10
06:10 - 06:25
06:25 - 08:00
08:00 - 08:15
08:15 -11:00
11:00-13:15
13:15 -14:15
14:15 -15:00
15:00 - 17:30
17:30 - 18:00
18:00 - 18:15
18:15 - 18:30
18:30 - 18:45
18:45 - 19:25
19:25 - 21 :20
1/27/2003
21 :20 - 21:40
21:40 - 22:10
22: 10 - 00:00
00:00 - 00:30
00:30 - 02:20
latchup at 52.2 bbls. LWP launched at 2100 psi. Incr rate to
1.8/1430. Saw press incr when plug in 2-7/8" at 1.8/1540.
LWP landed in ported sub at calc displ. SO pump, bleed off
press
Set back inj; RU and circ liner and annulus to FW
Safety mtg re: LD liner
UD BOT Deploy sleeve, CTLRT, XO, XN, 10' 3-1/2" pup, 10 jts
3-3/16" TC11, 10 jts 2-7/8" STL, LSL sub, shoe & ported sub.
Inspected LSL sub & LWP - OK, wiper fins not damaged.
Held PJSM on running liner assembly.
M/U float equipment, 56 jts 2-7/8" 6.16# L-80 STL liners, 2-7/8"
STL pups, LSL sub, 11 jts 3-3/16" 6.2# L-80 TC11 liners, XO,
'XN' nipple, 3-1/2" STL pups, BOT deployment sleeve &
CTLRT. M/U coil.
RIH with liner on CT. Check up wt - 41.5k, down wt - 20k. RIH
smoothly @ 50 fpm thru window. Continue RIH. Set down in
shale @ 12392'.
Work & wash from 12375' to 12650'. Continue RIH & set down
again @ 12950'. Continue working/wahing. See flag @ 12974'
(-32 correction). Tag TO solid @ 13082' CTD. P/U @ 47.5k.
RBIH & retag TO solid @ same depth. Correct depth to 13050'.
Load & launch 5/8" phenolic ball. Set down 10k Ibs down on
CTLRT. Chase ball with 2.0/2.0bpm, 2150psi.Slow down @
40bbls away. Ball on seat @ 47.5bbls. Pressure up to 4100psi
& release CTLRT. P/U @ 33k & confirm release.
Displace well to 2% KCI @ 3.2/3.1 bpm/, 3350psi & ship back
used mud to MI. Getting plenty of solids back & plugging off the
out micromotion with +ve WHP. Meanwhile RIU Dowell
cementers.
Continue circ hole @ 2.4/2.2bpm, 1000psi. Meanwhile clean out
plugged out micromotion.
COMP P~ot'êeñìèRqBk-:~
COMP .Æátch-up cemenfslurry.
COMP//' Final circ parameters 2.0/1.7/800. PT OS 4000 psi. Load C
, w/23 bbls G cement w/latex 2.0/1.7/2000
Load wiper dart and displace w/26 bbls biozan and KC!. Out
MM plugged again-temp fix it in time to see returns diminished
to 2.6/2.1/1430 as cement turned the corner. Red rate to
1.8/1000 before latchup. Latched LWP at calc displ and
sheared at 3300 psi. Fin dispI2.1/1.8/1480. LWP bumped at
calc displ. Chk floats, ok. Unsting from liner at 32k. 20.9 bbls
circ'd around shoe ~- .
C P ~!.º:§.j)p~/409~i--Wf'Iile dilutillf!t 3 bbls excessJ~ver th
/ top) cement w/ blozWOOH to surf afreduced pump ra .
L--T-ear~M-áfjd found a piece of Hydril rubber causin
previous plugging probs
LD CTLRT ~
MU 3:-8O"-o-~otor/MHA _____.~.-
RIH wI BHA- #6' ~-------
Precautionary ream 4-112" liner 2.6/2.6/1350 while RIH 50'/min.
See flag at 10900' EOP (-30' corr). Tag TOL and stalled at
11045' (uncorrected CTD). TOL by pipe tally is 11017'
POOH to surf 2.8/1500 psi. Dump 100 bbls dirty water wI max
1.08 CASE P
COMP
0.83 CASE P
0.25 CASE P
1.58 CASE P
COMP
COMP
COMP
0.25 CASE P
2.75 CASE P
COMP
COMP
2.25 CASE P
COMP
1.00 CASE P
COMP
0.75 CASE P
COMP
2.50 CASE P
COMP
0.50 CASE P
COMP
0.25 CEMT P
0.25 CEMT P
0.25 CEMT P
0.67 CEMT P
1.92 CASE P
0.33 CASE P
0.50 EVAL P
1.83 EVAL P
0.50 EVAL P
1.83 EVAL P
COMP
Printed: 2/3/2003 12:22:18 PM
~7!Æ~¡
~Í
. ¡
~.
')
j'
!Æ~~~~~~
)
AT¡ASIiA OIL AND GAS
CONSERVATION'COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lamar Gantt
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P. O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Unit 15-15B
BP Exploration (Alaska) Inc.
Permit No: 202-258
Surface Location: 2467' SNL, 1546' EWL, SEC. 22, TIIN, RI4E, UM
Bottomhole Location: 2494' SNL, 2151' EWL, SEC. 27, TIIN, R14E, UM
Dear Mr. Gantt:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~#~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this I)/!'day of January, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
') STATE OF ALASKA '1
ALASKI""\ 61L AND GAS CONSERVATION COMIVIISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 57.48' Prudhoe Bay Field I Prudhoe
6. Property Designation Bay Pool
ADL 028309
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number /
15-158
9. Approximate spud date
01/21/03 Amount $200,000.00
/ 14. Number of acres in property 15. Pr0p.9sed depth (MD and TVD)
2560 /12850' MD 18966' TVD
17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)}
91 0 Maximum surface 2412 psig, At total depth (TVD) 8887' I 3300 psig
Setting Depth
TaD Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
1810' 11040' 8912' 12850' 8966' 83 sx Class 'G'
1 a. Type of work 0 Drill II Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2467' SNL, 1546' EWL, SEC. 22, T11 N, R14E, UM
At top of productive interval
1911' SNL, 3728' EWL, SEC. 27, T11N, R14E, UM
At total depth
2494' SNL, 2151' EWL, SEC. 27, T11N, R14E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 028306, 2494' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 11060' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Hole Casina Weiaht Grade Couplina
3-3/4" 3-3/16" x 2-7/8" 6.2/6.16# L-80 ST-L
ilJ(.:'A- Ilr5/(1'5
11. Type Bond (See 20 AAC 25.025)
Number 2S 100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 12656 feet Plugs (measured)
true vertical 8970 feet
Effective depth: measured 12565 feet Junk (measured)
true vertical 8969 feet
Casing Length Size Cemented
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
80' 20"
2556' 13-3/8"
10127' 9-5/8"
766' 7"
2964' 4-1/2"
MD
TVD
300 sx Permafrost II
2300 sx Fondu, 400 sx Permafrost
80'
2556'
80'
2556'
500 sx Class 'G'
400 sx Class 'G'
395 sx Class 'G'
10127' 8300'
9831' - 10597' 8064' - 8692'
R ff -EfV E [1952' 8970'
DEC J 1 2002
true vertical
11280'- 12150',12190'- 12270',12410'- 12530'
Perforation depth: measured
8910'-8934',8937'-8945',8963'-8968'
20. Attachments
Alaska OiJ& Gas Gons. Commission
Anchor~8
II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Mark Johnson, 564-5666
21. I hereby certify that ~e foregoing is ~e an~ correct to the best of my kn~~ledge .
Signed Lamar Gantt 1f114'~ o. >rr1L-1~ Title CT Dnlllng Engineer
" ~" '.,/ ·,Ccnnm'ssiOl'i U~.tOnly
Permit Number API· ber
202. - .2... 5" g- 50- 0 9-20691-02
Conditions of Approval: Samples Required 0 Yes ~ No
Hydrogen Sulfide Measures ~ Yes 0 No
Required Working Pressure for BOPE 0 2K
Other: ·Tt·~t 6vPf ~ 3S()'JO f ~ l .
ORIGINAL SIGNED 8 Y
M l. Dill · Commissioner
Approved By
Form 10-401 Rev. 12-01-85
Prepared By Name/Number: Sandra Stewman, 564-4750
Date
¡¿/30/(]L-.
I,
APProv~ D.,ta . /1 See cover letter
\ \ _'J üJ for other requirements
Mud Log Requi ed ' 0 Yes Œ1 No
Directional Survey Required fð1 Yes 0 No
o 3K D4K D5K D10K D15K 0 3.5K psi for CTU
by order of
the commission
Date \ 13 ¡ 0 (~)
subnh In ~riPlicate
)
)
BP
15-15B Sidetracl{
Summary of Operations: /'
We1l15-15A is scheduled for a through tubing sidetrack with the SLB/Nordic I Coiled Tubing Drilling rig.
The sidetrack, Y--15B, will exit .ouk1.fthe existing horizonta14 Yí" liner from a whipstock at 11060'md and
target Zone lA reserves. The existing 4 )!Z" liner perfs are gassed out and will be abandoned with a CIBP /"
(form 10-403 already submitted). The following describes the planned sidetrack. A schematic diagram of the
proposed sidetrack is attached for reference.
Pre CTD Summary (phase 1)
1) Slickline -Drift tubing. Dummy gas lift valves. Pressure test IA to 2500 psi.
2) Service Coil- FCO wellbore to 11300'. Drift tubing and liner to 11280' with dummy whipstock. Set
CIBP at 11260' md. Wellbore abandonment is complete. Form 10-403 already submitted.
CTD Sidetrack Summary (phase 2)
1) MIRV CTD rig.
2) Set 4 Yí" whipstock at 11060' .;II'"
3) Mill window out of 4 Y~~:,~in:e~from whipstock at 11060'.
4) Drill 4 118" x 3.75'>fjl~~penh?le sidetrack ~o ~12.850' TD with ~D/g~a rae~"::'j
5) Run 3 3/16" x 2 ~Ìïíïër completIon. Top oflmer wIll be at 11040 . Cement WIth ~IS cement.
6) Run liner top packer.
7) Perforate and freeze protect. "
8) RDMO
Mud Program:
· Phase 1: 8.4 ppg seawater
· Phase 2: 8.5 ppg used Flo Pro for milling, new Flo Pro for drilling. /'
Disposal: /'
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject./
· All Class I wastes will go to Pad 3 for disposal.
Casiqg Program:
· A 3 3/16" x 2 7/8" solid cemented liner com~tion from 11040' to TD at 12850'. The liner cement volume is
planned to be ~17 bbls of 15.8 ppg class G.
Well Control: '"
· BOP diagram is attached. /
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
)
)
~
Directional
· See attached directional plan. Max. planned hole angle is 91 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· MWD Gamma Ray log will be run over all of the open hole section.
· A CNL/GR/CCL cased hole log is optional after the liner has been run and cemented.
Hazards
.
Drillsite 15 is not an H2S pad. ~ximum recorded on the pad was 33 ppm from well 15-44. Latest 15-
15A H2S is 6 pprn on 3/7/01.
No major fault crossing are anticipated so lost circulation risk is considered low.
.
Reservoir Pressure
Res. press. is estima,d to be 3300 psi at 8887'ss (7.2 ppg EMW). Max. surface pressure with gas (0.10 psi/ft) to
surface is 2412 psi.
MOl
12/30/02
./
~
Lf;;.'#;I..I.:i I :1¡\.1-""'.;J..,' .,¡ II II I~JL, 1'1'1 [:.II h.-t:.1 ill ¡(~ 1.1.·,' nt(.
File Section Edit View Planning ';u'V6Y Anticolflsion utiities
! ~ ~ I tï I If i!: ÅI I .'t. Ilk ~~ ¡¡¡ @ ''"- i' I ~
J
"'-:ì!õlI1~11('J- ~:ì!o1 I"';;':E:
+ I PiiI ! t<J C..
MD
(ft)
1 110"11.".00
~ll1"I'I'.ÕO
~111.·".00
-¡-- 1\ "'''.00
---s-- 11 ':';0.75
-š--fl,:,·...-g
-:¡- 1"'-'·3' I. 75'
S-'1 :~'J: :.75
-g- L"·1"I.75
--,o-1..>,'-·".Õö· .
1h .....
I L 1."1"10(((']1.'1[:'/"'-.
œ:\ I ~r¡;- I\. Il 0 r;:;;::;- Jill :-"W (')( 'ï;" aå I .JL ~õI
~ i ~ r@ ~ (Ib, 0° I Hm :.I ~ -= )<.j ¡,... QX. ¡ ""Ir ~t
Plan: Plan #4 (15-15A115-15B plan 4)
if
~
\"'GD~!~
I (~
174.91
-·175:âi ,. .
··iM4if·'··u
. 246'-92"
''27i1 i' ., . "
243.:J5'
'i7ò:25-' .- . ,-
'246'-26--
'0 '285:26'"'
-'~:ffi-'
.~J
,-.
~í&..
I Inc
(deg)
. 82.03
¡Š3:59,
188.'64 ..-
J~~:~:'
'88.25
:90.70'
-:ã9:ã3'
;89.93' .
faä94 .
-~
3000
2500
wen~~Œast(+)2~~J
---
000
500
-5000
-6500
-5500
-6000
§:
+'
€
o
~
~
:::s
o
if..:!
- ----.-
--
I
j
j
¡
I
I
j
I
I
i
¡
i
I
i
;
j
ì
~
r
!
I
j
!
j
I
i
1 .
1--- -
. -¡--
=-~~
I -
. . . I- . . .
6000
[ft]
¡
¡
i
¡
ì
i
i
¡
I
i
¡
l
;
!
¡
¡
!
1\,~,"L
; ~\
I
î
l
;
I' .
4000
Vertical Section at 155.47°
! o~_·
I j
I
-+-1000 - ¡
I '
I i
I I
I 2000 ¡
I ¡
¡ !
I ¡
I 3080 - :
I \ !
I "
1 - j
! 4080 -'" i !
i 'J,.,.. i
I 5080 'r\. ¡
I i ~"'.J
I :' ..
---i-'ti080 - ! ¡ """"
¡ ¡ i ~
I 7080 ¡ I
I ! I
! - \ I
! 8000- ¡ ! .
I i ì !
--1-9080~ : i I
. . I . . . , I ¡
000 0 . 10100 ' . 20100 . . 3oioO
§:
o£i
Q..
u
Ç¡
"'æ
~
'f!
u
>
~
c..
.c
__tt~"
,.~,~~.
~.i i;;.
I~~~~~
o .,~,~..
t- Z II:
o 0 w
w c w
"") W ~
m () C)
:J <C Z
() ŒI W
MOJ
I J..-!')ð ¡. 'I-
o
§
~
C')
C')
C\
::.:
«
c--'
~
=
ëC
a
c:J
z
-
lie
1&1
1&1
Z
-
c:J
Z
1&1
u..
o
Ó
Z
t-
W
W
:I:
()
ó
z
W
LL
~
t-
W
C)
Q
:J
ŒI
..J
>
D..
Il.
<C
t-=
c.
W
Q
ó
Z
W
..J
u:
W
~
Q
\
\
~
\
\
\
//
'irv oH
\
"
I 16 V"
\\O~D
- l,fl
.0°
, u" '1\
,,0,,0
H ')1v 6
~
'~-Tr-'~
· VI
~_ t:,_ ~._
\,
I -
.~.-'-- -~-_.,-----_._-
~~~-~----:.;.;r-'~~_(~'!f I \ __ ~~_._ l' \
J~--\ -=,=~"\-, -~-~? 7h ~~~__,__~ -_.,-,---~L~~, j"
~.. I I \ \ \ \ \ \ , \' I ___.2.._
" f ~_...---'._--.__.- ~.~- -._,
I
~rP
2. 13;/ f.'Y~'t y
~. ~t...
3~r-
l.
Y./z'S - 3.
lo'?. '}
It
ðll
/~,2-
/fA qA."':...1
~ /7 ßJ/
7IrpO
0,2
2-
Ii Sf>O
/5"-/5 B ~~ ~~e4v( VrF~UL
I' .. t
/;.S5ø-IJ5oo::=ë /ð5D x ],7$' -2-g7S ::: 7,&:,x/'i= /1
10 2-9
) /OLfo" .::.
,
~6(:)
x
/7 "L
~
3
T~EE = 5-1/8" FMC
WELLHEAD = FMC
·Ä·CTUÄTÕR;··..·~'-XXECSÕN·
..i<ä--ËCËV-;-----.--,..···..·----·----S7ï
·"ãf··ELB¡-·;····················..·········w·····3Š·:Š;
~..............,...................................................................................................
KOP = 2900'
M";; Angk;-;:..~95@T1..234;
Öäìü·mIViO·;;,;····'·'············Ú>S·S3..
·Òatum·ñiÕ·;··········Šâôôi"i:;-š"
) 15-158
Proposed CTD Sidetrack
r-\ì
~ (Zöf ~St- .
113-3/8" CSG, 72#, L-80, 10= 12.347" l-i
~
2556'
L
Minimum ID = 3.813" @ 9678'
HES X NIPPLE
SAFET't)ES:CHROMETBG. WELL >700@ 10947' AND
> 90° @ 1.... 37' - *** POSSIBLE IA x OA COMM.
OPERATINGPRESSUREOFTHE 13-3/8" ANNULUS
MUST NOT EXCEED 2500 PSI (09/24102 WAIVER) ***
2223' 1-15-1/2" CAMeO BAL-O SSSVN, ID = 4.562"
~ ST MD lVD
1 3910 3811
2 7253 6131
3 9572 7860
GAS LIFT MANDRELS
DEV TYPE VLV LATCH
36 LB DOME T2
49 LB DOME T2
38 LB S/O T2
PORT DATE
16 12/31/98
16 12/31/98
24 12/31/98
:8: :g~ 9642' 1-19-5/8" x 5-1/2" BKR S-3 PKR, ID = 5.750"
I 9647' 1-15-1/2" x 4-112" XO, ID = 3.938" I
~ I 1 9678' 1-14-1/2" HES X NIP, ID = 3.813" 1
15-1/2" TBG,17#, 13-CR, .0232 bpf,ID=4.892" 1-1 9647'
14-1/2" TBG, 12.6#, 13-CR, 0.0152 bpf, ID = 3.958" l-i 9699'
, I
~i
~ I
I
"1----1
§ I
..
8'
~
"'='
:.:.:.:
19-5/8" CSG, 47#, L-80,ID= 8.681" 1-1 10127' I~
9701'
9689'
9702'
9711'
1-17" UNIQUE RE-ENTRY GUIDE 1
1-19-5/8" X 7" BKR ZXP PKR, ID = 6.310" I
l-i 9-5/8" x 7" BKR HMC LNR HGR, ID = 6.310"
1-17" X 4-1/2" XO, ID = 3.938" I
. 1-1 TOP OF 7" BOT LNR HGR TIEBACK SL V
l-i 9-5/8" x 7" BOT LNR HGR I
9831'
9841'
11040' - TOL 3-3/16" Liner w/LTP
11040' - Top of Cermnt
11055' l-i 3.5" XN Nipple ID = 2.75"
I7"LNR'29#'L-80·::I:~:~:::· H 1100~0' I 'fî
10597' - 1 0609' ..:~~¡~¡
.:
PERFORA TION SUMMA RY
:~:~~E:~~~Ti~~~:;~~ ~'::;'~':'j~:7/:.~:ve:::nmn'_~ /
2-3/4" 4 11280 - 12150 isolated proposed / \ --.........-.-...---..--.-. ·f
2-3/4" 4 12190-12270 isolated proposed -#~ \~3-3/16"X2-7/8"Cn1'edandPerfedl-l 12850'
2-3/4" 4 12410 - 12530 isolated proposed /'
CIBP 11060' 1-1 Mechanical Whipstock 1
at 11260'
\4-1/2" LNR, 12.6#, L-80, 0.0152 bpf, ID= 3.958" 1-1 12653'
A-1
DATE
01/13/82
12/26/98
12/10/00
03105101
08/21/01
1 0/03102
REV BY
DATE
COMMENTS
sidetrack proposal 12/30
SIS-IsI
SIS-MD
CHltlh
BM'TP
COrvtv1ENTS
ORIGINAL COMPLETION
RIG SIDETRACK
CONVERTED TO CANVAS
ANAL
CORRECTIONS
WA tv ER SAfETY NOTE
REV BY
rroj
12565' 1-1 PBTD (LANDING COLLAR) I
ffiUDHOE SAY UNIT
WELL: 15-15A
PERMIT No: 1982410
A PI No: 50-029-20691-01
SEe 22 T11 N R14E, 2467' SNL & 1546' BNL
BP F1(ploration (Alas ka)
)
TREE = 5-1/8" FMC
WELLHEAD = FMC
ÁcfuÄï'Öï=f; ..·..·Aj¿-E[·SÖN
kï3~'ËLBï«;" «·..··«···«·67;
ï3ï=:ËLBï''';' . «... «'«"«'«39:ä;
\k'ö'p"~"""" . ....."..,."'.................... 2900'
,~.~x..Aïïgie..~···'·!j5·(~·T1··234J
Datum I'vD = 10863'
Datum lV D = 8BOO'SS
15-15A
C'frsr/¡Jcr
e
113-318" CSG, 72#, L-BO, D = 12.347" H
~
2556'
L
Minimum ID = 3.813" @ 9678'
HES X NIPPLE
15-1/2" TBG, 17#. 13-CR, .0232 bpf, ID = 4.892" H 9647'
:8: :;:s
t i
14-1/2" TBG, 12.6#, 13-CR, 0.0152 bpf, ID = 3.958" H 9699' IJ \¡.----i
\ i I
1
I .. t
I 9-5/8" CSG, 47#, L-80, ID = 8.681" H 10127' ~ ~
PERFORATION SUMMl\RY
REF LOG: SPERRY-SUN MIND ON 12/19/98
ANGLE AT TOP PERF: 92 @ 11280'
I\bte: Refer to A'oductbn œ for historical perf data
SIZE SPF INTERV AL Opn/Sqz DATE
2-314" 4 11280 -12150 0 12/25/98
2-314" 4 12190 - 12270 0 12/25/98
2-314" 4 12410 - 12530 0 12/25/98
1 7" LNR, 29#, L-BO, 0.0371 bpf, ID = 6.184" H 11000' ~
,t
...
-
I
14-1/2" LNR, 12.6#, L-80. 0.0152 bpf, D =3.958" H 12653'
OA.TE
01/13/82
12/26/98
12/1 0100
03105¡{) 1
08/21101
10103102
REV BY
SIS-lsl
S 1S-1'vD
Q-i/tlh
BM/TP
CO I'vfv18'JTS
ORlGINA.L COMPLETON
RIG SIDETRAO<.
CONY ERTED TO CA IW AS
FINA. L
CORRECTONS
WAfVER SAFEfY NOTE
DATE
REV BY
COMrvENTS
')
SAFETY NOTES: CHROM ETBG. WB..L > 70° @ 10947' AND
>900@ 11137'· *- POSSIBLE lAx OA CO MM.
OPERAT1NGPRESSUREOFTHE 13·3/S" ANNULUS
MUST NOT EXCEED 2500 PSI (09/24/02 WAIVER) *-
2223' t-15-1/2" CAtvCO BAL-O SSSVN, ID = 4.562"
~ ST I'vD lVD
1 3910 3811
2 7253 6131
3 9572 7860
GAS LIFT MANDRELS
DEV TYPE VL V LA TCH
36 LB DOrvE T2
49 LB DOrvE T2
38 LB S/O T2
PORT DA TE
16 12/31/98
16 12/31/98
24 12/31/98
9642' t-19-5/8" X 5-1/2" BKR &3 PKR, ID = 5.750"
9647' 1-15-1/2" X 4-1/2" XO, ID = 3.938" I
9678' 1-t4-1/2" HES X NIP, ID = 3.813" I
9701'
9689'
9702'
9711'
9831'
9841'
1-17" UNIQUER6-ENTRY GUIDE 1
- 9-5/8" X 7" BKR ZXP PKR, ID = 6.310" I
- 9-5/8" X 7" BKR HMC LNR HGR, ID = 6.31 0"
1-17" X4-1/2"XO, ID= 3.938" I
I-tTOP OF 7" BOT LNR H3R TIE33ACK SL V
1-i9-5/8" X 7" BOT LNR HGR 1
7" MlLLOur WINDOW
10597' - 10609'
I 12565' H FBTD (LANDING COLLA R) 1
PRLDI-()EBAY U'JIT
WELL: 15-15A
PERMIT I\b: 1982410
AA No: 50-029-20691-01
SEC 22 T11N R14E, 2467' Sf'..l. & 1546' 8NL
BP Exploration (Alaska)
) BP·GDB )
Survey Report - Geographic
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB DS 15
15-15A
15~15B,plan 4
Prudhoe Bay
North Slope
UNITED STATES
Map Systcm:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Datc: 12/30/2002 Time: 16:13:19 Page:
Co-ordinate(NE) Reference: . Well: 15~15A, True North
Vertical (TVD) Reference: 25 : 1511/24/1998 10:5856.0
Section (VS) Reference: Well (0.00N,0.aOE,173.39Azi)
Survey Calculation Method: Minimum Cu~ature Db:
1
Sybase
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2000
Site: PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5958837.36 ft
676296.98 ft
Latitude:
Longitude:
North Reference:
Grid Convergencc:
70 17 35.236 N
148 34 21.213 W
True
1 .34 deg
Well: 15-15A Slot Name: 15
15-15A
Surface Position: +N/-S 184.73 ft Northing: 5959050.59 ft Latitude: 70 17 37.052 N
+E/-W 1217.78 ft Easting : 677510.01 ft Longitude: 148 33 45.723 W
!>osition Uncertainty: 0.00 ft
Reference Point: +N/-S 184.73 ft Northing: 5959050.59 ft Latitude: 70 17 37.052 N
+E/-W 1217.78 ft Easting : 677510.01 ft Longitude: 148 33 45.723 W
Measured Dcpth: 24.98 ft Inclination: 0.00 deg
Vertical Depth: 24.98 ft Azimuth: 0.00 deg
Wellpath: 15-15B plan 4 Drilled From: 15-15A
Tie-on Depth: 11060.00 ft
Currcnt Datum: 25: 15 11/24/1998 10:58 Height 55.98 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/11/2002 Declination: 26.21 deg
Field Strength: 57498 nT Mag Dip Angle: 80.81 deg
Vertical Section: Depth J!~rom (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 173.39
Survey Program for Definitive Wellpath
Date: 12/11/2002 Validated: No Version: 0
Planned From To Survey Toolcode Tool Name
ft ft
96.48 10546.48 1 : Gyrodata large ID casing m GYD-LlD-MS Gyrodata large ID casing m/s
10595.52 12569.23 3 : MWD - Standard (0) MWD MWD - Standard
11060.00 12850.00 Planned: Plan #4 V1 BLIND Blind drilling
Survey
Map Map <-..- Latitude ....> <--- Longitude -..>
MD Inel Azim TVD +N/-S +E/- W Northing Easting Deg Min See Deg Min See
ft deg deg ft ft ft ft ft
24.98 0.00 0.00 24.98 0.00 0.00 5959050.59 677510.01 70 17 37.052 N 148 33 45.723 W
96.48 0.24 172.58 96.48 -0.15 0.02 5959050.44 677510.03 70 17 37.051 N 148 33 45.722 W
196.48 0.33 170.52 196.48 -0.64 0.09 5959049.95 677510.12 70 17 37.046 N 148 33 45.720 W
296.48 0.32 176.39 296.48 -1.20 0.16 5959049.39 677510.20 70 17 37.040 N 148 33 45.718 W
396.48 0.29 172.72 396.48 -1.73 0.21 5959048.86 677510.26 70 17 37.035 N 148 33 45.717 W
496.48 0.31 157.89 496.47 -2.23 0.34 5959048.36 677510.40 70 17 37.030 N 148 33 45.713 W
596.48 0.25 151 .45 596.47 -2.68 0.55 5959047.93 677510.62 70 17 37.026 N 148 33 45.707 W
696.48 0.13 125.39 696.47 -2.93 0.75 5959047.68 677510.82 70 17 37.023 N 148 33 45.701 W
796.48 0.18 70.08 796.4 7 -2.95 0.99 5959047.67 677511.06 70 17 37.023 N 148 33 45.694 W
896.48 0.15 63.34 896.47 -2.83 1.25 5959047.79 677511.33 70 17 37.024 N 148 33 45.686 W
996.48 0.34 10.29 996.47 -2.48 1.42 5959048.14 677511.49 70 17 37.028 N 148 33 45.681 W
1096.48 0.51 1.76 1096.47 -1.75 1.49 5959048.88 677511.54 70 17 37.035 N 148 33 45.679 W
1196.48 0.54 3.02 1196.46 -0.83 1.53 5959049.80 677511.55 70 17 37.044 N 148 33 45.678 W
1296.48 0.47 3.75 1296.46 0.05 1.58 5959050.68 677511.59 70 17 37.053 N 148 33 45.677 W
1396.48 0.47 355.82 1396.46 0.87 1.57 5959051 .49 677511.56 70 17 37.061 N 148 33 45.677 W
1496.48 0.45 0.58 1496.45 1.67 1.55 5959052.30 677511.52 70 17 37.069 N 148 33 45.678 W
1596.48 0.44 358.48 1596.45 2.45 1.54 5959053.07 677511.49 70 17 37.076 N 148 33 45.678 W
o~
) Bp·GDB )
Survey Report - Geographic
Company: BP Amoco Date: 12/30/2002 Time: 16:13:19 Page: 2
Field: Prudhoe Bay Co~ordinate(NE) Reference: Well: 15-15A, True North
Site: PB OS 15 Vertical (TVD) Reference: 25: 15 1i1/24/1998 10:5856.0
Well: 15-15A Section (VS) Reference: Well (0.00N,0.00E,173.39Azi)
Wellpath: 15-15Bplan 4 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
Map Map <.... Latitude ~...> <... .Longitude ..~.>
MD Ind Azim TVD +N/·S +E/·W Northing Easting Deg Min Sec Deg Min' Sec
ft deg deg ft ft ft ft ift
1696.48 0.30 357.84 1696.45 3.09 1.52 5959053.72 677511 .46 70 17 37.083 N 148 33 45.678 W
1796.48 0.18 4.49 1796.45 3.51 1.52 5959054.13 677511.45 70 17 37.087 N 148 33 45.678 W
1896.48 0.42 347.00 1896.45 4.02 1.45 5959054.65 677511.37 70 17 37.092 N 148 33 45.680 W
1996.48 1.17 355.27 1996.44 5.40 1.29 5959056.02 677511.17 70 17 37.105 N 148 33 45.685 W
2096.48 1.19 28.27 2096.42 7.33 1.69 5959057.96 677511 .53 70 17 37.124 N 148 33 45.673 W
2196.48 0.86 34.93 2196.40 8.86 2.62 5959059.51 677512.42 70 17 37.139 N 148 33 45.646 W
2296.48 0.55 62.19 2296.39 9.70 3.47 5959060.37 677513.25 70 17 37.148 N 148 33 45.621 W
2396.48 0.59 95.40 2396.39 9.87 4.41 5959060.57 677514.18 70 17 37.149 N 148 33 45.594 W
2496.48 0.70 105.37 2496.38 9.66 5.51 5959060.38 677515.29 70 17 37.147 N 148 33 45.562 W
2596.48 1.01 76.07 2596.37 9.71 6.95 5959060.47 677516.73 70 17 37.148 N 148 33 45.520 W
2696.48 3.63 116.20 2696.28 8.53 10.65 5959059.37 677520.46 70 17 37.136 N 148 33 45.412 W
2796.48 7.05 123.97 2795.84 3.70 18.58 5959054.73 677528.50 70 17 37.089 N 148 33 45.181 W
2896.48 10.29 127.60 2894.68 -5.18 30.75 5959046.14 677540.87 70 17 37.001 N 148 33 44.826 W
2996.48 11 .43 137.81 2992.90 -17.97 44.48 5959033.67 677554.90 70 17 36.876 N 148 33 44.426 W
3096.48 16.26 148.52 3089.98 -37.27 58.46 5959014.71 677569.33 70 17 36.686 N 148 33 44.019 W
3196.48 18.78 150.22 3185.33 -63.18 73.77 5958989.17 677585.24 70 17 36.431 N 148 33 43.573 W
3246.48 20.39 151.62 3232.44 -77.83 81.91 5958974.72 677593.73 70 17 36.287 N 148 33 43.336 W
3296.48 22.00 152.52 3279.06 -93.81 90.37 5958958.95 677602.56 70 17 36.130 N 148 33 43.089 W
3346.48 23.22 152.64 3325.21 -110.87 99.22 5958942.10 677611.81 70 17 35.962 N 148 33 42.831 W
3396.48 24.33 152.85 3370.97 -128.79 108.45 5958924.41 677621.46 70 17 35.786 N 148 33 42.562 W
3446.48 25.35 153.02 3416.34 -147.49 118.01 5958905.93 677631 .46 70 17 35.602 N 148 33 42.284 W
3496.48 26.52 153.48 3461.31 -167.02 127.85 5958886.65 677641.76 70 17 35.410 N 148 33 41.997 W
3546.48 27.76 153.68 3505.80 -187.45 137.99 5958866.47 677652.38 70 17 35.209 N 148 33 41.701 W
3596.48 29.05 153.50 3549.78 -208.75 148.57 5958845.42 677663.46 70 17 34.999 N 148 33 41.393 W
3646.48 30.88 153.01 3593.09 -231.05 159.82 5958823.40 677675.23 70 17 34.780 N 148 33 41.065 W
3696.48 32.09 151.74 3635.73 -254.18 171.93 5958800.56 677687.88 70 17 34.552 N 148 33 40.712 W
3746.48 33.36 150.85 3677.80 -277.89 184.91 5958777.17 677701.42 70 17 34.319 N 148 33 40.334 W
3796.48 34.80 149.72 3719.21 -302.22 198.80 5958753.17 677715.88 70 17 34.080 N 148 33 39.929 W
3846.48 36.08 149.09 3759.94 -327.17 213.56 5958728.58 677731.22 70 17 33.835 N 148 33 39.499 W
3896.48 37.71 148.77 3799.93 -352.88 229.05 5958703.24 677747.32 70 17 33.582 N 148 33 39.047 W
3946.48 39.59 148.62 3838.98 -379.56 245.28 5958676.95 677764.17 70 17 33.319 N 148 33 38.575 W
3996.48 41.41 148.62 3876.99 -407.28 262.19 5958649.64 677781.73 70 17 33.047 N 148 33 38.082 W
4046.48 42.76 148.52 3914.10 -435.88 279.66 5958621.47 677799.87 70 17 32.765 N 148 33 37.573 W
4096.48 43.32 148.54 3950.64 -464.98 297.48 5958592.79 677818.37 70 17 32.479 N 148 33 37.053 W
4146.48 43.66 148.55 3986.92 -494.34 315.44 5958563.87 677837.01 70 17 32.190 N 148 33 36.530 W
4196.48 43.46 148.72 4023.15 -523.76 333.37 5958534.89 677855.63 70 17 31.901 N 148 33 36.008 W
4246.48 43.89 148.70 4059.32 -553.26 351 .30 5958505.81 677874.26 70 17 31.611 N 148 33 35.485 W
4296.48 44.32 148.76 4095.22 -583.01 369.36 5958476.51 677893.01 70 17 31.318 N 148 33 34.959 W
4346.48 43.98 148.69 4131.09 -612.77 387.45 5958447.18 677911.79 70 17 31.026 N 148 33 34.432 W
4396.48 43.85 148.59 4167. 11 -642.39 405.49 5958418.00 677930.53 70 17 30.734 N 148 33 33.906 W
4446.48 43.66 148.64 4203.23 -671.90 423.50 5958388.92 677949.23 70 17 30.444 N 148 33 33.381 W
4496.48 43.74 148.68 4239.38 -701.41 441 .47 5958359.85 677967.89 70 17 30.154 N 148 33 32.858 W
4546.48 44.17 148.76 4275.37 -731.07 459.49 5958330.62 677986.60 70 17 29.862 N 148 33 32.333 W
4596.48 44.48 148.75 4311.14 -760.94 477.61 5958301.19 678005.42 70 17 29.568 N 148 33 31.805 W
4646.48 44.52 148.80 4346.80 -790.91 495.78 5958271.66 678024.29 70 17 29.274 N 148 33 31.275 W
4696.48 44.22 148.79 4382.54 -820.81 513.89 5958242.19 678043.11 70 17 28.979 N 148 33 30.747 W
4746.48 43.99 148.78 4418.45 -850.57 531.93 5958212.87 678061.84 70 17 28.687 N 148 33 30.222 W
4796.48 44.09 148.77 4454.39 -880.30 549.94 5958183.58 678080.55 70 17 28.394 N 148 33 29.697 W
4846.48 44.33 148.77 4490.23 -910.11 568.02 5958154.21 678099.33 70 17 28.101 N 148 33 29.170 W
4896.48 44.47 148.83 4525.95 -940.03 586.14 5958124.72 678118.15 70 17 27.807 N 148 33 28.642 W
4946.48 44.15 149.01 4561.73 -969.94 604.17 5958095.25 678136.88 70 17 27.513 N 148 33 28.117 W
4996.48 44.14 149.08 4597.61 -999.81 622.09 5958065.81 678155.49 70 17 27.219 N 148 33 27.595 W
5046.48 44.17 149.17 4633.48 -1029.70 639.96 5958036.35 678174.06 70 17 26.925 N 148 33 27.074 W
) BP-GDB )
Survey Report - Geographic
Company: BP Amoco Dåte: 12/30/2002 Time: 16:13:19 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 15-15A, True North
Site: PB OS 15 V ertic~l (TVD) Reference: 25 : .15 11/24/1 998 10:58 56.0
Well: 15·15A Section (VS) Ref'erence: Well (0.OON,O.OOE,173.39Azi)
Wellpath: 15-15B plan 4 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
Map Map <.... 'Latitude ~...> <... Longitude ...>
MD Ind Azim TVD +N/·S +E/·W Northh1g Easting Deg Min Sec Deg Min See
ft , deg deg ft ft ft ft ft
5096.48 44.06 149.17 4669.38 -1059.59 657.80 5958006.90 678192.60 70 17 26.631 N 148 33 26.555 W
5146.48 44.17 149.13 4705.28 -1089.47 675.64 5957977.45 678211.15 70 17 26.337 N 148 33 26.035 W
5196.48 44.04 149.35 4741.18 -1119.37 693.44 5957947.98 678229.65 70 17 26.043 N 148 33 25.516 W
5246.48 44.17 149.54 4777.08 -1149.34 711.13 5957918.44 678248.04 70 17 25.748 N 148 33 25.001 W
5296.48 44.20 149.65 4812.94 -1179.40 728.77 5957888.81 678266.38 70 17 25.453 N 148 33 24.487 W
5346.48 44.40 149.86 4848.72 -1209.56 746.36 5957859.07 678284.68 70 17 25.156 N 148 33 23.974 W
5396.48 44.06 150.10 4884.55 -1239.76 763.81 5957829.29 678302.83 70 17 24.859 N 148 33 23.466 W
5446.48 44.13 150.33 4920.46 -1269.96 781.09 5957799.51 678320.82 70 17 24.562 N 148 33 22.962 W
5496.48 44.54 150.40 4956.22 -1300.33 798.37 5957769.56 678338.81 70 17 24.263 N 148 33 22.459 W
5546.48 44.81 150.44 4991.78 -1330.90 815.72 5957739.41 678356.88 70 17 23.963 N 148 33 21.953 W
5596.48 45.16 150.57 5027.14 -1361.67 833.13 5957709.06 678375.00 70 17 23.660 N 148 33 21.446 W
5646.48 45.62 150.76 5062.26 -1392.70 850.56 5957678.46 678393.17 70 17 23.355 N 148 33 20.938 W
5696.48 45.81 151.10 5097.17 -1423.98 867.95 5957647.59 678411.29 70 17 23.047 N 148 33 20.432 W
5746.48 46.49 151.14 5131.81 -1455.56 885.37 5957616.44 678429.45 70 17 22.736 N 148 33 19.924 W
5796.48 46.62 151 .22 5166.19 -1487.36 902.87 5957585.06 678447.69 70 17 22.424 N 148 33 19.415 W
5846.48 46.84 151.30 5200.46 -1519.28 920.37 5957553.56 678465.94 70 17 22.110 N 148 33 18.905 W
5896.48 47.36 151.49 5234.50 -1551.44 937.91 5957521.83 678484.23 70 17 21.793 N 148 33 18.394 W
5946.48 47.37 151.94 5268.36 -1583.83 955.34 5957489.86 678502.42 70 17 21.475 N 148 33 17.886 W
5996.48 47.43 152.07 5302.21 -1616.33 972.62 5957457.78 678520.46 70 17 21.155 N 148 33 17.383 W
6046.48 47.81 152.45 5335.91 -1649.02 989.81 5957425.51 678538.42 70 17 20.834 N 148 33 16.882 W
6096.48 48.22 152.97 5369.36 -1682.05 1006.85 5957392.89 678556.23 70 17 20.509 N 148 33 16.386 W
6146.48 48.55 153.27 5402.56 -1715.39 1023.75 5957359.96 678573.91 70 17 20.181 N 148 33 15.893 W
6196.48 48.67 153.41 5435.62 -1748.91 1040.58 5957326.85 678591.53 70 17 19.851 N 148 33 15.403 W
6246.48 48.63 153.48 5468.66 -1782.49 1057.36 5957293.68 678609.10 70 17 19.521 N 148 33 14.914 W
6296.48 48.58 153.49 5501.72 -1816.05 1074.10 5957260.52 678626.63 70 17 19.191 N 148 33 14.427 W
6346.48 48.73 153.70 5534.75 -1849.67 1090.80 5957227.31 678644.11 70 17 18.860 N 148 33 13.940 W
6396.48 48.80 153.79 5567.70 -1883.39 1107.43 5957193.99 678661.53 70 17 18.528 N 148 33 13.456 W
6446.48 48.99 153.86 5600.58 -1917.21 1124.05 5957160.58 678678.95 70 17 18.196 N 148 33 12.972 W
6496.48 48.99 154.00 5633.39 -1951 .10 1140.63 5957127.10 678696.32 70 17 17.863 N 148 33 12.489 W
6546.48 49.13 154.01 5666.15 -1985.05 1157.19 5957093.55 678713.67 70 17 17.529 N 148 33 12.007 W
6596.48 49.09 153.97 5698.88 -2019.02 1173.76 5957059.98 678731.04 70 17 17.194 N 148 33 11.524 W
6646.48 49.25 154.15 5731.57 -2053.04 1190.31 5957026.36 678748.39 70 17 16.860 N 148 33 11.042 W
6696.48 49.47 154.26 5764.14 -2087.20 1206.82 5956992.61 678765.70 70 17 16.524 N 148 33 10.561 W
6746.48 49.72 154.18 5796.55 ·2121.48 1223.38 5956958.72 678783.07 70 17 16.187 N 148 33 10.079 W
6796.48 49.49 154.06 5828.95 -2155.74 1240.00 5956924.87 678800.49 70 17 15.850 N 148 33 9.594 W
6846.48 49.17 154.04 5861.53 -2189.84 1256.60 5956891.17 678817.88 70 17 15.514 N 148 33 9.111 W
6896.48 48.88 153.80 5894.32 -2223.75 1273.19 5956857.67 678835.27 70 17 15.181 N 148 33 8.628 W
6946.48 49.00 153.90 5927.16 -2257.59 1289.81 5956824.23 678852.68 70 17 14.848 N 148 33 8.144 W
6996.48 48.37 153.83 5960.17 -2291.31 1306.35 5956790.92 678870.02 70 17 14.516 N 148 33 7.662 W
7046.48 48.59 153.83 5993.32 -2324.90 1322.86 5956757.72 678887.31 70 17 14.186 N 148 33 7.181 W
7096.48 48.15 153.66 6026.53 -2358.42 1339.39 5956724.61 678904.63 70 17 13.856 N 148 33 6.700 W
7146.48 48.30 153.66 6059.84 -2391.84 1355.94 5956691 .59 678921.96 70 17 13.528 N 148 33 6.218 W
7196.48 48.24 153.82 6093.12 -2425.30 1372.45 5956658.53 678939.26 70 17 13.198 N 148 33 5.737 W
7246.48 48.32 153.92 6126.40 -2458.81 1388.88 5956625.42 678956.48 70 17 12.869 N 148 33 5.258 W
7296.48 47.76 154.09 6159.83 -2492.23 1405.18 5956592.40 678973.56 70 17 12.540 N 148 33 4.784 W
7346.48 48.01 154.09 6193.36 -2525.59 1421.38 5956559.43 678990.55 70 17 12.212 N 148 33 4.312 W
7396.48 47.69 154.27 6226.91 -2558.96 1437.53 5956526.46 679007.47 70 17 11 .884 N 148 33 3.842 W
7446.48 47.51 154.37 6260.63 -2592.23 1453.53 5956493.57 679024.25 70 17 11 .556 N 148 33 3.376 W
7496.48 47.42 154.49 6294.43 -2625.47 1469.43 5956460.72 679040.94 70 17 11 .230 N 148 33 2.912 W
7546.48 47.39 154.54 6328.27 -2658.69 1485.27 5956427.88 679057.55 70 17 10.903 N 148 33 2.451 W
7596.48 47.47 154.63 6362.10 -2691.95 1501.07 5956395.01 679074.14 70 17 10.576 N 148 33 1.991 W
7646.48 47.46 154.67 6395.90 -2725.25 1516.85 5956362.10 679090.69 70 17 10.248 N 148 33 1.532 W
)-
) BP-GDB )
Survey Report - Geographic
Company: BPAmoco Date: 12/30/2002 Time: 16:13:19 Page: 4
:Ficld: Prudhoe Bay Co~ordinate(NE) Reference: Well: 15-15A, True North
Site: PB OS 15 Vertical (TVD) Reference: 25 : 15 11/24/1998 10:58 56.0
Well: 15-15A Section· (VS) Reference: Well (0.00N,O.00E,173.39Azi)
Wellpath: 15-15B plan 4 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
Map Map <_u_ Latitude m_> <_u Longitude --->
MD Ind Azim TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec
ft deg deg ft ft ft ft ft
7696.48 47.55 154.77 6429.67 -2758.58 1532.59 5956329.14 679107.22 70 17 9.920 N 148 33 1.073 W
7746.48 47.45 154.87 6463.45 -2791.95 1548.28 5956296.16 679123.68 70 17 9.592 N 148 33 0.616 W
7796.48 47.56 154.94 6497.23 -2825.33 1563.91 5956263.16 679140.10 70 17 9.264 N 148 33 0.161 W
7846.48 45.86 154.96 6531.51 -2858.30 1579.32 5956230.56 679156.28 70 17 8.939 N 148 32 59.712 W
7896.48 43.87 155.28 6566.95 -2890.30 1594.16 5956198.93 679171.87 70 17 8.625 N 148 32 59.280 W
7946.48 42.29 155.58 6603.47 -2921.36 1608.36 5956168.22 679186.80 70 17 8.319 N 148 32 58.867 W
7996.48 40.60 155.99 6640.95 -2951.54 1621.94 5956138.37 679201.09 70 17 8.022 N 148 32 58.471 W
8046.48 39.03 156.37 6679.35 -2980.82 1634.87 5956109.39 679214.71 70 17 7.734 N 148 32 58.095 W
8096.48 38.93 156.58 6718.22 -3009.66 1647.42 5956080.86 679227.94 70 17 7.451 N 148 32 57.729 W
8146.48 38.86 156.76 6757.13 -3038.49 1659.86 5956052.34 679241.05 70 17 7.167 N 148 32 57.367 W
8196.48 39.15 156.89 6795.99 -3067.42 1672.24 5956023.71 679254.11 70 17 6.883 N 148 32 57.007 W
8246.48 39.24 156.82 6834.74 -3096.47 1684.66 5955994.96 679267.21 70 17 6.597 N 148 32 56.645 W
8296.48 39.48 157.20 6873.40 -3125.67 1697.05 5955966.07 679280.28 70 17 6.310 N 148 32 56.285 W
8346.48 39.45 157.39 6912.00 -3154.98 1709.31 5955937.05 679293.24 70 17 6.021 N 148 32 55.927 W
8396.48 39.38 157.59 6950.63 -3184.31 1721.47 5955908.02 679306.08 70 17 5.733 N 148 32 55.574 W
8446.48 39.40 157.90 6989.27 -3213.68 1733.48 5955878.95 679318.78 70 17 5.444 N 148 32 55.224 W
8496.48 39.50 158.14 7027.88 -3243.14 1745.37 5955849.78 679331.37 70 17 5.154 N 148 32 54.877 W
8546.48 39.75 158.39 7066.39 -3272.76 1757.18 5955820.45 679343.87 70 17 4.863 N 148 32 54.534 W
8596.48 39.73 158.73 7104.84 -3302.51 1768.87 5955790.98 679356.25 70 17 4.570 N 148 32 54.193 W
8646.48 39.76 158.97 7143.28 -3332.33 1780.40 5955761.45 679368.49 70 17 4.277 N 148 32 53.858 W
8696.48 39.85 159.30 7181.69 -3362.24 1791.80 5955731.82 679380.59 70 17 3.983 N 148 32 53.526 W
8746.48 39.80 159.44 7220.09 -3392.21 1803.08 5955702.13 679392.58 70 17 3.688 N 148 32 53.197 W
8796.48 39.86 159.48 7258.49 -3422.20 1814.32 5955672.41 679404.52 70 17 3.393 N 148 32 52.870 W
8846.48 39.58 159.53 7296.95 -3452.12 1825.51 5955642.76 679416.41 70 17 3.099 N 148 32 52.544 W
8896.48 39.55 159.67 7335.50 -3481.97 1836.61 5955613.18 679428.21 70 17 2.805 N 148 32 52.221 W
8946.48 39.59 159.81 7374.04 -3511.86 1847.64 5955583.57 679439.94 70 17 2.511 N 148 32 51.900 W
8996.48 39.43 159.69 7412.61 -3541.70 1858.65 5955554.00 679451 .65 70 17 2.218 N 148 32 51.580 W
9046.48 39.51 159.75 7451.21 -3571.51 1869.66 5955524.45 679463.37 70 17 1 .924 N 148 32 51.259 W
9096.48 39.34 159.85 7489.83 -3601.31 1880.63 5955494.92 679475.03 70 17 1.631 N 148 32 50.940 W
9146.48 39.21 159.85 7528.54 -3631.03 1891.53 5955465.47 679486.64 70 17 1 .339 N 148 32 50.622 W
9196.48 39.11 160.13 7567.31 -3660.70 1902.34 5955436.07 679498.14 70 17 1.047 N 148 32 50.308 W
9246.48 39.10 160.14 7606.11 -3690.36 1913.05 5955406.67 679509.55 70 17 0.755 N 148 32 49.996 W
9296.48 38.93 160.33 7644.96 -3719.98 1923.70 5955377.31 679520.89 70 17 0.464 N 148 32 49.686 W
9346.48 38.89 160.32 7683.86 -3749.55 1934.27 5955348.00 679532.16 70 17 0.173 N 148 32 49.378 W
9396.48 38.90 160.36 7722.78 -3779.11 1944.83 5955318.70 679543.42 70 16 59.882 N 148 32 49.071 W
9446.48 38.66 160.36 7761.76 -3808.61 1955.36 5955289.46 679554.63 70 16 59.592 N 148 32 48.765 W
9496.48 38.43 160.67 7800.86 -3837.98 1965.75 5955260.34 679565.72 70 16 59.303 N 148 32 48.462 W
9546.48 38.37 160.47 7840.05 -3867.27 1976.08 5955231.31 679576.74 70 16 59.015 N 148 32 48.161 W
9596.48 38.45 160.71 7879.23 -3896.57 1986.41 5955202.27 679587.75 70 16 58.727 N 148 32 47.861 W
9646.48 38.32 161.01 7918.42 -3925.90 1996.59 5955173.18 679598.62 70 16 58.439 N 148 32 47.565 W
9696.48 38.29 160.82 7957.66 -3955.19 2006.72 5955144.15 679609.44 70 16 58.151 N 148 32 47.270 W
9746.48 38.10 161.07 7996.95 -3984.41 2016.81 5955115.17 679620.22 70 16 57.863 N 148 32 46.976 W
9796.48 38.06 160.90 8036.31 -4013.57 2026.86 5955086.26 679630.95 70 16 57.576 N 148 32 46.683 W
9846.48 37.69 161.34 8075.78 -4042.61 2036.79 5955057.46 679641 .57 70 16 57.291 N 148 32 46.394 W
9896.48 37.32 162.02 8115.44 -4071.51 2046.36 5955028.80 679651.82 70 16 57.006 N 148 32 46.116 W
9946.48 37.18 162.49 8155.24 -4100.33 2055.59 5955000.20 679661.72 70 16 56.723 N 148 32 45.847 W
9996.48 36.84 162.90 8195.17 -4129.07 2064.54 5954971.69 679671.35 70 16 56.440 N 148 32 45.587 W
10046.48 36.79 163.80 8235.20 -4157.77 2073.13 5954943.20 679680.61 70 16 56.158 N 148 32 45.337 W
10096.48 36.40 164.29 8275.34 -4186.43 2081.32 5954914.74 679689.47 70 16 55.876 N 148 32 45.098 W
10146.48 35.86 166.43 8315.73 -4214.95 2088.77 5954886.41 679697.60 70 16 55.596 N 148 32 44.882 W
10196.48 35.45 166.24 8356.35 -4243.27 2095.66 5954858.26 679705.15 70 16 55.317 N 148 32 44.681 W
10246.48 34.79 166.08 8397.25 -4271.20 2102.54 5954830.50 679712.69 70 16 55.042 N 148 32 44.481 W
10296.48 33.72 165.80 8438.58 -4298.50 2109.38 5954803.37 679720.17 70 16 54.774 N 148 32 44.282 W
) BP-GDB )
Survey Report - Geographic
Company: BP Amoco Date: 12/30/2002 Time: 16:13:19 Page: 5
}field: Prudhoe Bay Co-ordinate(NE) Reference: Well:15~15A, True North
Site: PB DS 15 Vertical(TVD) Reference: 25 : 15 11/24/1998 10:58 56.0
Well: 15-15A Section (VS) Reference: Well (0.00N,O.00E,173.39Azi)
Wellpath: 15-15B plan.4 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
Map Map <.--- Latitude ...-:> <--- Longitude ...>
MD Inel Azim TVD +N/·S +E/·W Northing Easting Deg Min Sec Deg , Min Sec
ft deg deg ft ft ft ft ft
10346.48 33.44 165.76 8480.23 -4325.31 2116.17 5954776.74 679727.59 70 16 54.510 N 148 32 44.084 W
10396.48 33.11 165.64 8522.04 -4351.89 2122.94 5954750.32 679734.99 70 16 54.249 N 148 32 43.887 W
10446.48 32.87 165.58 8563.97 -4378.26 2129.71 5954724.12 679742.38 70 16 53.989 N 148 32 43.690 W
10496.48 32.50 165.52 8606.06 -4404.41 2136.45 5954698.14 679749.73 70 16 53.732 N 148 32 43.494 W
10546.48 31.86 166.43 8648.38 -4430.24 2142.90 5954672.47 679756.79 70 16 53.478 N 148 32 43.307 W
10595.52 31.57 166.50 8690.09 -4455.31 2148.94 5954647.56 679763.42 70 16 53.232 N 148 32 43.131 W
10625.83 35.74 168.61 8715.32 -4471.71 2152.54 5954631.25 679767.40 70 16 53.070 N 148 32 43.026 W
10656.84 41.13 170.35 8739.60 -4490.66 2156.04 5954612.39 679771.35 70 16 52.884 N 148 32 42.925 W
10688.84 47.47 171.79 8762.49 -4512.72 2159.49 5954590.41 679775.32 70 16 52.667 N 148 32 42.824 W
10723.68 53.60 173.10 8784.63 -4539.38 2163.01 5954563.85 679779.47 70 16 52.405 N 148 32 42.722 W
10754.69 56.89 174.13 8802.30 -4564.69 2165.84 5954538.61 679782.90 70 16 52.156 N 148 32 42.640 W
10784.74 57.41 173.92 8818.60 -4589.80 2168.47 5954513.57 679786.12 70 16 51.909 N 148 32 42.563 W
10815.12 59.87 173.53 8834.41 -4615.58 2171.31 5954487.86 679789.56 70 16 51.655 N 148 32 42.481 W
10848.87 63.30 173.84 8850.47 -4645.08 2174.57 5954458.45 679793.52 70 16 51.365 N 148 32 42.386 W
10880.69 66.62 175.21 8863.93 -4673.78 2177.31 5954429.83 679796.94 70 16 51.083 N 148 32 42.306 W
10912.84 69.03 175.05 8876.07 -4703.44 2179.84 5954400.24 679800.17 70 16 50.791 N 148 32 42.233 W
10945.67 71.67 173.71 8887.11 -4734.20 2182.87 5954369.56 679803.92 70 16 50.489 N 148 32 42.145 W
10975.01 74.27 173.90 8895.70 -4762.09 2185.90 5954341.75 679807.61 70 16 50.214 N 148 32 42.057 W
11008.75 76.59 175.90 8904.19 -4794.61 2188.80 5954309.31 679811.28 70 16 49.894 N 148 32 41.973 W
11040.88 80.25 174.87 8910.64 -4825.98 2191.33 5954278.01 679814.55 70 16 49.586 N 148 32 41.899 W
11060.00 82.03 174.91 8913.58 -4844.80 2193.02 5954259.24 679816.68 70 16 49.401 N 148 32 41.851 W
11080.00 83.59 175.81 8916.09 -4864.57 2194.62 5954239.51 679818.75 70 16 49.206 N 148 32 41.804 W
11100.00 86.10 180.15 8917.88 -4884.47 2195.32 5954219.63 679819.92 70 16 49.011 N 148 32 41.784 W
11120.00 88.64 184.46 8918.80 -4904.43 2194.52 5954199.66 679819.58 70 16 48.814 N 148 32 41.807 W
11140.00 88.02 189.43 8919.38 -4924.27 2192.10 5954179.77 679817.64 70 16 48.619 N 148 32 41.878 W
11160.00 87.42 194.39 8920.18 -4943.82 2187.98 5954160.14 679813.98 70 16 48.427 N 148 32 41.998 W
11180.00 86.84 199.37 8921.18 -4962.92 2182.18 5954140.90 679808.63 70 16 48.239 N 148 32 42.167 W
11200.00 86.28 204.34 8922.38 -4981 .45 2174.75 5954122.21 679801.64 70 16 48.057 N 148 32 42.384 W
11220.00 85.75 209.33 8923.77 -4999.25 2165.74 5954104.20 679793.06 70 16 47.882 N 148 32 42.646 W
11240.00 85.25 214.32 8925.35 -5016.18 2155.23 5954087.02 679782.96 70 16 47.715 N 148 32 42.952 W
11260.00 84.78 219.32 8927.08 -5032.13 2143.30 5954070.80 679771.40 70 16 47.559 N 148 32 43.300 W
11280.00 84.36 224.32 8928.98 -5046.96 2130.03 5954055.66 679758.48 70 16 47.413 N 148 32 43.687 W
11300.00 83.98 229.33 8931.01 -5060.57 2115.52 5954041.71 679744.31 70 16 47.279 N 148 32 44.109 W
11320.00 83.64 234.35 8933.17 -5072.85 2099.89 5954029.07 679728.97 70 16 47.158 N 148 32 44.565 W
11340.00 83.36 239.37 8935.43 -5083.71 2083.26 5954017.82 679712.60 70 16 47.051 N 148 32 45.049 W
11360.00 83.12 244.40 8937.79 -5093.07 2065.75 5954008.05 679695.31 70 16 46.959 N 148 32 45.559 W
11370.00 83.02 246.92 8938.99 -5097.16 2056.70 5954003.75 679686.37 70 16 46.919 N 148 32 45.823 W
11375.00 83.13 247.52 8939.60 -5099.08 2052.13 5954001.72 679681.84 70 16 46.900 N 148 32 45.956 W
11400.00 83.66 250.49 8942.47 -5107.98 2028.95 5953992.28 679658.88 70 16 46.813 N 148 32 46.631 W
11425.00 84.21 253.45 8945.12 -5115.67 2005.31 5953984.03 679635.43 70 16 46.737 N 148 32 47.320 W
11450.00 84.78 256.41 8947.52 -5122.14 1981.28 5953977.00 679611.57 70 16 46.674 N 148 32 48.019 W
11475.00 85.36 259.37 8949.67 -5127.36 1956.93 5953971.20 679587.35 70 16 46.622 N 148 32 48.729 W
11500.00 85.95 262.32 8951 .56 -5131.33 1932.32 5953966.65 679562.84 70 16 46.584 N 148 32 49.445 W
11525.00 86.55 265.26 8953.20 -5134.03 1907.53 5953963.37 679538.12 70 16 46.557 N 148 32 50.168 W
11550.00 87.16 268.20 8954.57 -5135.45 1882.61 5953961.36 679513.24 70 16 46.543 N 148 32 50.893 W
11575.00 87.78 271.14 8955.67 -5135.59 1857.64 5953960.63 679488.28 70 16 46.542 N 148 32 51.621 W
11583.75 88.00 272.17 8955.99 -5135.34 1848.90 5953960.67 679479.54 70 16 46.544 N 148 32 51.875 W
11600.00 88.00 270.22 8956.56 -5135.00 1832.66 5953960.63 679463.30 70 16 46.548 N 148 32 52.348 W
11625.00 88.01 267.22 8957.43 -5135.56 1807.68 5953959.48 679438.34 70 16 46.542 N 148 32 53.075 W
11650.00 88.02 264.21 8958.30 -5137.43 1782.77 5953957.02 679413.48 70 16 46.524 N 148 32 53.801 W
11675.00 88.04 261.21 8959.16 -5140.60 1757.99 5953953.27 679388.79 70 16 46.493 N 148 32 54.523 W
11700.00 88.06 258.21 8960.01 -5145.06 1733.41 5953948.23 679364.32 70 16 46.449 N 148 32 55.239 W
) BP-GDB }
Survey Report - Geographic
Company: BP Amoco Date: 12/30/2002 Time: 16:13:19 Page: 6
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well:, 15-15A, True North
Site: PB OS 15 Vertical (TVD)Reference: 25 : 15 11/24/1998 10:58 56:0
Well: 15-15A Section (VS) Reference: Well (0.00N,O.00E,173.39Azi)
Wellpath: 15-15B plan 4 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
Map Map <---~. Latitude----> <.-. L9ngitµde ~~->
MD Ind Azim TVD -tN/-S ~E/-W Northing Easting D~g Min Sec Deg Min Sec
ft deg deg ft ft ' ft· ft ft
11725.00 88.09 255.21 8960.85 -5150.80 1709.10 5953941.91 679340.15 70 16 46.393 N 148 32 55.947 W
11750.00 88.12 252.21 8961.68 -5157.81 1 685. 1 2 5953934.34 679316.34 70 16 46.324 N 148 32 56.645 W
11775.00 88.16 249.21 8962.49 -5166.07 1661.54 5953925.53 679292.97 70 16 46.242 N 148 32 57.332 W
11800.00 88.20 246.20 8963.28 -5175.55 1638.42 5953915.51 679270.08 70 16 46.149 N 148 32 58.005 W
11823.75 88.25 243.35 8964.02 -5185.66 1616.95 5953904.89 679248.86 70 16 46.050 N 148 32 58.631 W
11825.00 88.26 243.50 8964.06 -5186.22 1615.83 5953904.31 679247.75 70 16 46.044 N 148 32 58.663 W
11850.00 88.52 246.49 8964.76 -5196.78 1593.18 5953893.21 679225.36 70 16 45.941 N 148 32 59.323 W
11875.00 88.79 249.48 8965.34 -5206.15 1570.01 5953883.30 679202.42 70 16 45.849 N 148 32 59.998 W
11900.00 89.06 252.47 8965.81 -5214.29 1546.39 5953874.60 679178.99 70 16 45.768 N 148 33 0.686 W
11925.00 89.34 255.46 8966.16 -5221.20 1522.36 5953867.13 679155.14 70 16 45.701 N 148 33 1.386 W
11950.00 89.61 258.45 8966.39 -5226.84 1498.01 5953860.92 679130.93 70 16 45.645 N 148 33 2.095 W
11975.00 89.89 261.43 8966.50 -5231.21 1473.40 5953855.97 679106.43 70 16 45.602 N 148 33 2.812 W
12000.00 90.17 264.42 8966.49 -5234.29 1448.59 5953852.31 679081.71 70 16 45.572 N 148 33 3.534 W
12025.00 90.44 267.41 8966.35 -5236.07 1423.66 5953849.94 679056.82 70 16 45.555 N 148 33 4.260 W
12048.75 90.70 270.25 8966.12 -5236.55 1399.92 5953848.89 679033.11 70 16 45.550 N 148 33 4.952 W
12050.00 90.70 270.09 8966.10 -5236.55 1398.67 5953848.87 679031.85 70 16 45.550 N 148 33 4.988 W
12075.00 90.59 267.1 0 8965.82 -5237.16 1373.68 5953847.66 679006.89 70 16 45.544 N 148 33 5.716 W
12100.00 90.49 264.10 8965.58 -5239.08 1348.76 5953845.16 678982.02 70 16 45.525 N 148 33 6.442 W
12125.00 90.38 261.10 8965.39 -5242.30 1323.97 5953841.35 678957.32 70 16 45.493 N 148 33 7.164 W
12150.00 90.27 258.10 8965.25 -5246.81 1299.38 5953836.26 678932.85 70 16 45.449 N 148 33 7.880 W
12175.00 90.16 255.10 8965.16 -5252.60 1275.07 5953829.90 678908.67 70 16 45.392 N 148 33 8.588 W
12200.00 90.05 252.11 8965.12 -5259.66 1251.09 5953822.28 678884.87 70 16 45.323 N 148 33 9.286 W
12225.00 89.94 249.11 8965.12 -5267.96 1227.51 5953813.42 678861.49 70 16 45.241 N 148 33 9.973 W
12248.75 89.83 246.26 8965.17 -5276.98 1205.54 5953803.89 678839.75 70 16 45.153 N 148 33 10.613 W
12250.00 89.83 246.41 8965.17 -5277.48 1204.39 5953803.36 678838.61 70 16 45.148 N 148 33 10.646 W
12275.00 89.84 249.41 8965.24 -5286.88 1181.23 5953793.42 678815.68 70 16 45.055 N 148 33 11.321 W
12300.00 89.84 252.41 8965.31 -5295.05 1157.61 5953784.69 678792.26 70 16 44.975 N 148 33 12.009 W
12325.00 89.85 255.41 8965.38 -5301.98 1133.59 5953777.20 678768.41 70 16 44.907 N 148 33 12.708 W
12350.00 89.86 258.41 8965.45 -5307.64 1109.24 5953770.96 678744.21 70 16 44.851 N 148 33 13.417 W
12375.00 89.86 261.41 8965.51 -5312.02 1084.63 5953766.00 678719.71 70 16 44.808 N 148 33 14.134 W
12400.00 89.87 264.41 8965.57 -5315. 11 1059.83 5953762.33 678694.98 70 16 44.778 N 148 33 14.857 W
12425.00 89.88 267.41 8965.62 -5316.89 1034.89 5953759.96 678670.10 70 16 44.760 N 148 33 15.583 W
12450.00 89.89 270.41 8965.67 -5317.36 1009.90 5953758.90 678645.13 70 16 44.756 N 148 33 16.311 W
12475.00 89.89 273.41 8965.72 -5316.53 984.92 5953759.14 678620.13 70 16 44.764 N 148 33 17.038 W
12500.00 89.90 276.41 8965.76 -5314.39 960.01 5953760.69 678595.19 70 16 44.785 N 148 33 17.764 W
12525.00 89.91 279.41 8965.80 -5310.95 935.25 5953763.55 678570.35 70 16 44.819 N 148 33 18.485 W
12550.00 89.92 282.41 8965.84 -5306.22 910.71 5953767.70 678545.71 70 16 44.865 N 148 33 19.200 W
12573.75 89.93 285.26 8965.87 -5300.54 887.65 5953772.83 678522.52 70 16 44.921 N 148 33 19.871 W
12575.00 89.93 285.11 8965.87 -5300.21 886.44 5953773.13 678521.31 70 16 44.924 N 148 33 19.906 W
12600.00 89.93 282.11 8965.90 -5294.33 862.15 5953778.44 678496.88 70 16 44.982 N 148 33 20.614 W
12625.00 89.93 279.11 8965.93 -5289.73 837.58 5953782.46 678472.21 70 16 45.028 N 148 33 21.329 W
12650.00 89.93 276.11 8965.96 -5286.42 812.80 5953785.18 678447.36 70 16 45.060 N 148 33 22.051 W
12675.00 89.93 273.11 8965.99 -5284.41 787.89 5953786.60 678422.41 70 16 45.080 N 148 33 22.776 W
12700.00 89.93 270.11 8966.02 -5283.71 762.90 5953786.71 678397.41 70 16 45.087 N 148 33 23.504 W
12725.00 89.93 267.11 8966.05 -5284.31 737.91 5953785.52 678372.45 70 16 45.081 N 148 33 24.232 W
12750.00 89.94 264.11 8966.08 -5286.23 712.98 5953783.02 678347.58 70 16 45.062 N 148 33 24.958 W
12775.00 89.94 261.11 8966.10 -5289.44 688.19 5953779.22 678322.87 70 16 45.031 N 148 33 25.680 W
12800.00 89.94 258.11 8966.13 -5293.95 663.61 5953774.13 678298.40 70 16 44.986 N 148 33 26.396 W
12825.00 89.94 255.11 8966.16 -5299.74 639.29 5953767.77 678274.23 70 16 44.929 N 148 33 27.104 W
12850.00 89.94 252.11 8966.18 -5306.79 615.31 5953760.15 678250.42 70 16 44.860 N 148 33 27.803 W
\.
Þ
Nordic CrD BOP Detail
/UI
I
I
I
XO Spool as necessary \ /
I I
®
, I
®
I I
~ THA I
L ~ --;1
Tubing @
r Spool I
I I
-@r~
~
Methanol Injection ðJLð
Otis 7" WLA Quick II
Connect -
I
7-1/16" 10, 5000 psi working pressure ~
Ram Type Dual Gate BOPE
Manual over Hydraulic
\..
I
I.
K
rc=
HCR \
r-@ltt\-=:f
L _LKlA-
I
TOT
Flanged Fire Resistant
Kelly Hose to Dual
Choke Manífold
7-1/16" 10, 5000 psi working pressure ~
Ram Type Dual Gate BOPE I TOT I=~
Manual over Hydraulic =
Full production christmas
tree
MOJ
9/15/02
o~
~ -- CT Injector Head
I 1
-- stuffing Box (Pack-Off), 10,000 psi Working Pressure
-.."..
7" Riser
I
~
Annular BOP (Hydril),7-1/16" 10
5000 psi working pressure
./
I
I
.b=t I Blind/Shear I /~"
12 3/8 " Combi PiPe/Sli~
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on DS Hardline to StandpipE
manifold
I
1tQ9mfBJ Ir~te
l
/
I
I
,//
2" Side outlets
2 3/8" X 3 1/2" VBRs
23/8" Combi Pipe/Slip
2 flanged gate valves
Inner Annulus
Outer Annulus
I
; ~': / .,"\ ~
~ (~
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from. records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
æ\~y:<>~~~::::~:.::::::::.:.::· ::::::~"~.}:.:,:::~.\:: ;'.:::,::: f\y¡
I-' " ':' 'l"~;¡ . ~..........,:..._':¡.... < ...... ......:
C{f~r}t.l;r/:i::~¿:~{/Ä:;:.':à'
III 0 5... ~ ? j III I: 0... ¡. 2 0 j ß c¡ 5 I: 0 ¡. 2 ? 8 Ii b III
NOV 18,200.2 **** $100.00****
NOT VALID AFTER 120 DAYS
AMOUNT
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
~
054973
No.P
H
NET
VENDOR
DISCOUNT
P054973
DATE
11/18/02
CHECK NO.
DATE
ALAI3KAOIL &GASCONSERVAT:r::O'N
COMMISSION
33 3W 7TH A~NUE sUITE :tOO
ANCHORAGE 'dA!< 99501
TO THE
ORDER
OF
NATIONAL CITY BANK
Ashland, Ohio
J
PAY
8 fJ ~ ~ i'" 0 ..''':>'''1 .:'...~~... ;II',
\ "...- " , .' /" "' .,.' 'f¡.f 'fO
':: .---- :- :.-_: - :.c:f:' _.;- c-.._ __-_ - ~í f _ ,\_"_ Il,t ~: _.:~_. __-::.
.. -.. ...~~..\ ./)1 Imt,,,n...'WJtJ. "",
GROSS
BP EXPLORATION, (ALASKA) INC,
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGE, AK995J9-6612
TOTAL ~
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
t' L--'._ (' c:-,. 12
) ) -0
PERMIT TO DRIL~ FEE
11/18/02 INV# CK111402N
DESCRIPTION
INVOICE I CREDIT MEMO
DATE
P054973
WELL PERMIT CHECKLIST COMPANY/<. fJ )< WELL NAME f'/SQ I_t; -' /.t; IS PROGRAM: Exp _ Dev 2S:. Redrll X- Re-Enter _ Serv _ Wellbore seg _
FIELD & POOLh 7'o/...ç t") INIT CLASS .ÎJ~V I-~/I GEOL AREA ? J 0 UNIT# lJ~ SO ON/OFF SHORE C:;/\J
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . f0 N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. W ell located proper distance from drilling unit boundary. . Y N
6. W ell located proper distance from other wells.. . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . ::p N
(Service Well Only) 13. Well located wlin area & strata authorized by injection order #_ '!. Y )'1.). 4\.
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . ., YN
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ·Y·N·-
16. Surface casing protects all known USDWs. . . . . . . y...-N-
17. CMT vol adequate to circulate on conductor & surf csg. . . . .¥-N""fU!A.-
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~N
19. CMT will cover all known productive horizons. . . . . . . .. .
20. Casing designs adequate for C, T, B & permafrost. . . . . . .
. ~. ~N CT/ì\. U
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . I )
22. If a re-drill, has a 10-403 for abandonment been approved. . . ~ ~ ¡, 2. / " 3
23. Adequate wellbore separation proposed.. . .'. . . . " . . . . (j)
24. If diverter required, does It meet regulations. .. . . . . . . . Y Nl'-ilk- ~
25, Drilling fluid program schematic & equip list adequate. . . . . I. . NN mÞLÄ,l f11 ~ q .S. ¡JpoJ ~
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . P
27. BOPE press rating appropriate; test to .~ So 0 . p sig. N m S 2- '-i- 12.. P So ¿,
2ft Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
29. Work will occur without operation shutdown. . . . . . . . . . . ' N
30. Is Presence of H2S gas Probable.. . . . . . . . . . .. . . . . JcD N (C P P Ï'l>"-. í'v- 1'5 -I S- A- .
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . ~ /\lIlt-
GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . IN
APPR DATE 33. Data presented on potential overpressure zones. . . . . . . . Y
¿'/2-, ._ I J:::J .J~ 34. Seismic analysis of shallow gas zones. . . . . . . .. .. .. .. .. .. ,Y..~' ¡í) j ;4-
/V{ '/ ~'/..."-) 35. Seabed condition survey (if off-shore). . . . . .. ......
(Exploratory Only) 36. Contact namelphone for weekly progress reports.
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING
RP#. TEM JDH
APPR
DATE
ItL 13£~
APPR
DATE
VJ~ Å- 1113/(r~
Rev: 10/15/02
UIC ENGINEER
JBR
SFD
WGA /.
MJW
G:\geology\permits\checklist.doc
COMMISSIONER:
COT
DTS 0 I I 3 þ:3
M LB (!) 1/ /3/'0 :;¡
(
CommentsJl nstructions:
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file.
To inlprove the readability of the Well History file and to
simplify finding infomlation, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
)
)
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: .3 $
LisLib $Revision: 4 $
Fri Apr 18 15:32:22 2003
Reel Header
Service name....... ......LISTPE
Date.................... .03/04/18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................ UNKNOWN
Continuation Number...... 01
Previous Reel Narne.......UNKNOWN
Comments.,............... .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Da t. e. . . . . . . . . . . . . . . . . . . . . 0.3 /04/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number......01
Previous Tape Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOE'
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/HAD LOGS
#
WELL NAME:
API NUHBER:
OPERA'POE:
LOGGING COMPANY:
TA.I?E CREATION DATE:
#
JOB DATA
15-15B
500292069102
BP Exploration (Alaska) Inc.
Sperry Sun
18-APR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MV\I-3001l
B. JAHN
EGBE~TIMBA
MAD RUN .3
AK-MW-3001l
B. ,JAHN
EGBEëJIMBA
MWD .RUN 3
AK-MW-30011
B. JAHN
EGBEJIMBA
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
22
llN
14E
2467
1~46
57.48
.00
.00
#
WELL CASING RECORD
1ST STRING
2ND STRING
.3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 4.500 11068.0
3.750 4.500 11068.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE 8IT DEPTHS.
¿. ALL VERTICAL DEPTHS ARE SUB SEA TRUE VERTICAL DEPTHS (TVDSS).
3. t·IL'JD RUN 1 í-JAS DIRSCTIONAL í-JITll DUAL GfJ..Hl'lA RAY (DGf<.),
a Da -é)58
//0~
')
)
UTILIZING GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUNS 2 - 3WER.E DIRECTIONAL WITH DGR, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
5. MWD RUN 2 DID NOT' MAKE .I\NY F'OOTAGE. RESISTIVITY ACROSS THE RUN 1
INTERVAL WAS ACQUIRED ON A M.I\D PASS WHILE POOH AFTER RUN 2. THE
EWR4 DATA WERE DEPTH CORRECTED TO THE DRILLED GAMMA LOG FROH RUN 1.
THESE DATA. (EWR4) ARE INCLUDED WITH THE RUN 1 DATA.
7. A MAD PASS WAS PERFORMED WHILE POOH AFTER MWD RUN 3. THESE DATA
(SGRC AND EWR4) WERE DEPTH CORRECTED TO THE DRILLED GAMMA LOG FROM
.RUN 3. THESE DATA ARE INCLUnED .AS A SEPARATE MAD PASS.
8. MERGED MWD F\ND MT-\.D PI\SS DATl-\., SHIFTED TO PDC l,OG (MCNL 01/27/2003).
J.JOG HEADER AND RUN INFORMATION DATA RETIUN ORIGIN./\L DI\Il,I.ERS
DEPTH REFERENCES.
9. MWD RUNS 1 - 3 REPRESE.N'l' WELL 15-15£ WI'l'H API jf 50-029-20691-02.
nus WELL REACHED A TOTAL DEPTH (TO) OF 13050' MD, 8906' TVDSS.
SROP SMoo'rllED RA'TE or PENE'l'RA'l'ION WHILE DRILLING.
SGRC SIV[OOTI-IED GAf'.1Ml\ R1W CO\'18INED.
SEXP SMOOTHED PHA.8E SHIFT DERIVED RESIS'rIVI'l'Y (EXTRA SH1\LLOW SPACING) .
SESP SMOOTHED PHASE SHI FT DERIVED fŒSIS'I'IVI'I'Y (SHALLOW SPACING) .
SEMP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (MEDIUM SPACING).
SEDP SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (DEEP SPACING).
SFXE SMOOTHED FORMATION EXPOSURE TIME
"H" SUFFIX ON CURVE MNEMONIC DENOTES MAD PASS DATA
$
File Header
Service name............. STSLIB. 001
Service Sub Level Name...
Version Number...........1. 0.0
Date of Generation.......03/04/18
Maximum Physical Record..65535
Vi 1 e Type................ LO
Previous File Name.......STSLIB.OOO
Comment Eecord
FILE HEADER
FILE NUMBF.R:
EDITED NERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPX
RPS
RPD
RPM
ROP
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
10881. 0
11076.5
11076.5
11076.5
11076.5
11076..5
11094.5
STOP .DEPT.H
13006. .5
13018. .5
13018.5
13018.5
13018. .5
13018.5
13051. (\
#
BASELINE CURVE FOR SHIfTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
10881.0
10904.0
11073.5
11082.5
11091.0
11111.0
11122.5
11142.0
11151.5
11157.0
11:-::22.5
GR
10881.0
10904.0
11074.5
11082.0
11091.5
11113.5
11124.0
11144.5
11153.5
11160.5
112Z:Z. (\
)
)
11250.5
11284.0
11299.5
11309.0
11341.5
11365.5
11370.5
11406.5
11414.5
11420.0
11424.5
11468.0
11483.!:i
11491.0
11511.0
11530.,0
11545.5
11566.5
11580.0
11594.5
11622.0
116·12.::>
11726.0
11735.5
11738.0
11760.0
11777.5
11'786.5
11797.0
lUJll. .5
118¿~2.5
11829.0
11838..0
11848.5
11861.5
11871.0
11898.0
11904.0
11909.5
11917 . 0
11921.5
11939.0
11948.5
11958.5
11984.0
11990.0
11998.0
1200:).0
12010.5
12015.0
12019.0
12041.5
12054.5
12068.0
12077.5
12090.0
12101.5
12133.0
12146.5
12168.5
12178.5
12189.5
12199.5
12207.0
12:214.0
12257.0
12269.0
12300.5
12329.0
12337.0
12350.0
12359.0
12:::'[J~~ .0
12374..5
12382.0
11251.0
11285.0
11302.5
11310.5
11341.0
11367.0
11372.5
11405.5
11414.0
11418.5
11425.5
11463.0
11480..5
11488.5
11508.5
11525.5
11544.0
11565.0
11578.0
1l.5f:ì8. .5
11617.5
11639.::>
11723.5
11737.0
11739.0
11754.5
11802.0
11811.0
11818.0
11830.5
11839.5
11848.5
11857.5
11869.0
11881.0
11f:ì89.0
11916.0
11926.0
1192.9.0
11936.0
11942.0
11959.5
11965.0
11975. 0
11999.5
12006.5
12012.5
12018.:)
12023.5
12030.0
12035.0
12059.0
12071.5
12079.0
12090.5
12101.5
12109.5
1<:140.0
12151.5
12175.0
12183.0
12195.5
12204.5
12214.0
12:219.0
12263.5
LU73.0
12307.5
12333.0
12338.0
12347.5
12356.5
1:2]63.0
12375.0
12383..5
)
)
12391.5
12396.5
12407.5
12412.0
12437.5
1:24413.0
12456.5
1247:2.0
12495.0
12530.5
12536.5
12556.0
12558. .5
12575.0
12588.5
12600.5
12608.5
12619.5
12633.5
12647.5
12656.5
12664.~:)
12700.0
12703.5
12715.0
12728.5
12742.5
12753.5
12772.5
12786.5
12796.5
12809.5
12815.0
12835.0
12839.5
12849.5
12852.5
12869.0
12873.0
12884.5
12887.0
12893.0
12897.0
12910.0
12925.0
12931.0
12,937.0
12948.':)
12952.5
12959.5
12966.0
12980.5
12985.0
13051.0
$
12391.5
12400.0
12413.5
12420.0
124::)0.5
12462.5
12469.5
12486.5
12511.0
12542.0
12548.0
12565.0
12.566. .':i
12584.0
12596.0
12607.5
12613.0
12621.0
12636.0
12650.5
12662.0
12669.5
12703.5
12706.0
12718.5
12733.5
12746.5
12758.5
12775.5
12788.0
12799.0
12811.5
12817.0
1.2835.5
12839.5
12850.5
12855.5
12871.0
12::\76.5
128813.0
12tJ91.5
12897.5
12901. 5
12916.5
12930.0
1.2935.5
12939..5
12949.0
12955.0
12963.5
12969.5
12980.5
12984.5
13050.5
~
MERGED DATA SOURCE
PBU TOOL CODE
MtrJ 0
MWD
$
BIT RUN NO
1
3
MERGE TOI?
10881.0
11322.0
MERGE BASE
11400.0
13050.5
JI
REM}\RKS:
MERGED 1'1AIN P.;/:\SS.
è-
"
#
Data Format Specification Record
Data Recc'rd Type.................. (I
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference l?oint..............Undefined
Frame Spacing.. ...................60 .1IN
Max frames per record... ....... ...Undefined
Ab.s en t val u e. . . . . . . . . . . . . . . . . . . . . . - 9 9 9
Depth Units.......................
)
')
Datum Specification Block sub-type. . .0
Name S(2rv-i.ce Order Units Size N.sam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT!H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX M.WD OHMM 4 1 68 12 4
RPS I'1WD OHMM 4 1 68 16 5
R\?M MWD OHMM 4 1 6B 20 6
RPD ¡vrwD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT F'T 10881 13051 11966 4341 108~n 13051
ROP MWD FT!H 2.7 1941.66 102.671 3914 11094.5 13051
GR MWD API 20. -'5 428.69 6"7.7133 3949 10881 13006.5
RPX MWD o ]-IIVlM 3.7 618.35 19.0527 3 [JfJ 5 11076.5 130113.5
RI?S 1'1WD OHMM 3.82 75.07 18.6702 3885 11076.5 13018.5
RPM MWD OHMM 3.92 72 ..53 18.389 3885 11 07 6 . 5 13018.5
RPD MWD OHMM 4.15 2000 18.9!:)59 3885 11076.5 13018.5
FET MWD HOUR 0.19 14.9 2.43804 3885 11076.5 13018.5
First Reading For Entire File..........l0881
Last Reading For Entire File...........13051
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Nu.mber.......... .1.0.0
Date of Generation.......03/04/18
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name......... ..STSLIB.002
Physical EOF
File Heade.J::
Service name............ .STSLIB.002
Service Sub Level Name...
V¡;:;rsion Number.......... .1.0.0
Date of Generation.......03/04/18
Maximum Physical Record. .65535
File 'rype............... .LO
Previous File Name.......STSLIB.001
Comment Record
['ILE: llE,ADSR
FILE NUHBER:
EDITED HERGED MAD
Depth shi fted
DEPTH INCREMENT:
#
fILE SUMMARY
I?BU TOOL CODE
GR
RAT
RPM
RPX
RPS
FET
RPD
$
z
and clipped curves; all MAD runs merged using (2arliest passes.
.5000
STll.RT DEPTH
11321.0
11361.5
1·1363.0
11363.0
11363.0
11362'.0
11363.0
STOP DEPTH
13008.0
13043.5
13019.5
13019.5
13019.5
13019.5
13019.5
MERGED DATA SOURCE
F'BlJ TOOL CODE
Hi¡\JD
MAD RUN NO. MAD PASS NO. MERGE TOP
3 1 113n.O
tvlERGE BP\SE
13050.5
$
')
)
REMARKS:
MERGED HAD PASS.
.$
#
Data Formal_ SpE:;c..i.ficaL.Ì,on Reco.cd
Data Record Type..................O
Data Spec.if.i.catj.on Block 'rype..... 0
Logging Direction............. ....Down
Optical log depth units...........Fcct
Data Reference Point..............Undefined
Frame 8paciog.....................60 .1IN
Hax frames per record.............Uodefined
Absr,mt value..................... .-999
Dept,h Units.......................
Datum Specification Block sub-type...O
Name Service Order Uni t8. Siz.e Nsam Rep Code Offset Channel
DEPT FT 4 .1 68 0 1
RAT MAD FT/H 4 1 68 4 2
GR MAD API 4 .1 68 8 3
RPX MAD OHMM 4 .1 6f3 12 4
RPG MAD OHMM 4 1 68 16 5
RP1'1 HAD 01-11'11'1 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HOUR 4 1 68 28 8
Fi.r.st Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11321 13043.5 12182.3 3446 11321 13043.5
RA.T MAD FT/H 657.28 965.7 822. ,558 3343 11361.5 13043.5
GR 1'11\0 lWI 23.9'"1 323..22 65.~1891 3375 11321 13008
RPX 1'11\0 OHMM 3.69 27.48 9.99129 3314 11363 13019.5
F\P8 ~1AD OHMM 3.83 29.51 12.0812 3314 11363 13019.5
F\[>M Mf\D OHMM 3.96 33.46 13.3686 3314 11363 13019.5
RPD MAD OHMM 4.09 37 .02 14.9343 3314 11363 13019.5
FET MAD HOUR 0.4956 52.122 20.6718 3314 11363 13019.5
Pirst Reading Por Entire File..........11321
Last Reading for Entire rile...........13043.5
File Trailer
Service name............ .8TSL18.002
8ervice Sub Level Name...
Version Number...........l.0.0
Date of Generation.......03/04/18
Maximum Physical Record..65535
fi 1 e Type................ LO
Next File Name....... ....S'1'SLI8.003
Physical Eor
File Header
Service name....... ......8T8LI8.003
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation... ....03/04/18
Haximum Uhysical Record..65535
F i 1 e T yp e. . . . . . . . . . . . . . . . LO
Previous File Name.......STSL18.002
Comment Record
FILS [[SADSR
FI LE NUHBER: :)
RAtA] MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
#
fILE SUfvlMAF\Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
)
GR
RI?X
E'ET
RPD
RI?S
[{PM
ROP
$
10881.0
11077.0
11077.0
llOT! . 0
1107'7.0
1l077.0
H095.5
11371.5
11368.0
11368.0
11368.0
11368.0
11368.0
11400.0
#
LOG HEADEH. DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOV~NHOLE SOFT\i~AFŒ: VERSION:
DATA TYPE (MEMORY OR RE,]I,.L-TIME):
TO DRILLER (FT):
TOP LOG INTERVAI, (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIl'1UM l-\NGLE:
It
'1'001, STRING (TOP TO BOTTOM)
VENDOR TOOL CODE 1;'001, 'TYPE
GM Dual GR
8\NH.4 ELEC'l'ROMAG. .RESIS. 4
,$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (1,8/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FUJID LOSS (C3):
RESISTIV~TY (OHMM) AT TEMPERATURE (DEGF)
MUD A'f MEASURED TEMPERl\TURE (MT):
MUD AT MAX CIRCUL.ATING TERMPERATURE:
MUD ]:'1L'l'AA'1'8 AT Wi':
MUD CAKE AT MT:
It
NEUTRON TOOL
tv1ATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
It
REMARKS:
y
#
Data Format Specification Record
Data Record Type.... ..............0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point... ...........Undefined
E'ram8 .Spacing.................... .GO .lIN
Max frames per record....... .... ..Undefined
Abs e n t val u e. . . . . . . . . . . . . . . . . . . . . . - 999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
23-,JAN-03
Insite
4.3
Memory
11400.0
10880.0
11400.0
66.6
89.0
TOOL NUMBER
78012
125631
4.125
1,1068.0
Flo Pro
8.90
55.0
8.5
44000
.0
.070
.000
.120
.090
70.0
137.9
70.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
I~OP MI"¡D010 FT/H 4 1 68 4 ,.,
GR ¡"11iIJD01O }.\E'I 4 1 68 8 J
J
RPX ¡'1WDOIO OHMM 4 1 68 1:2
RPS MWD010 OHMM 1 68 16 5
)
)
EP¡V¡ ¡V¡WD010
RPD ¡V¡WD010
FET MWD010
OH¡V¡¡V¡
OI-!¡V¡¡V¡
HOUR
.1 68
1 68
1 68
~~ 0
24
28
6
7
8
First Last
Name Service UrÜt ¡V¡in Max Mean Nsam Reading Reading
DEprl' FT 10881 11400 11140.5 1039 10881 11400
ROP ¡V¡WD010 FT/I-! 33.95 151. 84 92.6373 610 1109:).5 11400
GR MWDOI0 API 20.75 191 . 05 75.5643 677 10881 11371.5
RI:'X MWD010 OHMM 4.91 618.35 33.5144 583 11 07 7 11368
RPS MWDOlO OHMM 5.86 75.07 33.644 583 11 07 7 11368
RP¡V¡ ¡V¡V'JD010 OHM!v1 5.82 72.53 33.867 583 11077 11368
RPD MWD010 OHMM '1.52 2000 38.950/ 583 11077 11368
FE '1' !v1WDOI0 HOUR 6.8'7 14.9 10.7504 583 .11 077 11368
E'ir:st, Rc.,;adiw,j Foe 8ntir:e File......... .10881
Last Reading For Entire File...........11400
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Va.csion Number.......... .1.0.0
Date ot Generation.......03/04/18
Maxinwm Physical Record..65535
I::'U e 'l'ype................ LO
Next File Name...........STSLIB.004
Physical EOF
Fi.l(2 Header
Service name. ....... .....STSLIB.004
Service Sub Level Name...
Version Number...... .....1.0.0
Date of Generation.. .....03/04/18
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous file Name.......SrSLIB.003
Comment Record
F'I L8 I!E~Am~R
FILE NU}IBER:
RAV'J MWD
Curve.s and log
BIT RUN NUMBER:
DEPTH INCREMENT:
if
FI LE SUMMAI'\Y
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
kl:'X
ROP
$
header data for each bit run in separate files.
3
.5000
START DEPTH
11354.5
11368.5
11368.5
11368.5
11368.5
11368.5
11400.5
STOP DEPTH
13005.5
13018.0
13018.0
13018.0
1:)018.0
13018.0
13050.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTW\RE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOl'1 LOG n\¡TERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
HINljv!UH .;::V;¡CLE:
25-JAN-03
Insite
4.3
Memory
13050.0
114UU.U
13050.0
iJ _' . \J
')
HAXItvlU¡V¡ ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
.$
BOTTOM)
TOOL TYPE
Dual GR
KLEC'l'ROMAG. RESIS. 4
#
BOR£HOLE AND CASING DATA
OPEN HOLE BIT 81%8 (IN):
DRILLER'S CASING DEPTH (FT):
it
IJORSHOLS CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
tvlUD CHLORIDES (PPtvI):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGf')
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD fILTRATE AT M'l':
MUD CAKE AT MT:
#
NEUTRON '1'OOL
IV1A'l' ¡U X:
M.ATRIX DENSITY:
HOLE CORREC'TION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMI\RKS :
$
#
Data Format Specification Record
Data ¡-<.eeord Type.................. 0
Data Specification Block. Type..... 0
T,oggi ng D'i n~ction. . . . . . . . . . . . . . . . . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame ~3pac:\ng..................... GO .1IN
Max frames per record........ ... ..Undefined
Absent value..................... .-999
Depth Units.......................
Datum Speci fication Block sub-t.ype... 0
')
93.6
TOOL NUMBER
82758
12,5631
3.'750
11068.0
Flo Pro
8.60
.0
9.0
23000
.0
.040
.020
.100
.060
.; S. U
158.9
75.0
75.0
Name Servic,," Order Un.its Size N¡3am Rep Code Offset Channel
DEPT FT 1 68 0 1
EOP Míi\1D030 FT/II 1 68 1 "
"-
GR HtÑD030 API 1 68 C 3
j-{!:,X ¡V¡WDCJ3CJ OHMM 4 1 68 12 4
RPS MWD030 OI-lMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 "7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Readinr:J Readinq
DEPT f1' 11354.5 13050.5 12202.5 3393 11354.5 13050.5
ROP MWDU3U FT/H 2./ 2131.21 lU4.USJl JJUl 114UU.~ 13U~U. ~
GR I'1WD030 API 25.94 180.5'7 65.3936 3303 11354.5 13005.5
R!:'X HWD030 OHMM 3.7 58.67 16.6868 3300 11368.5 13018
RPS MWD030 OHMM 3.82 46.31 16.2038 3300 11368.5 13018
RPH H¡,m030 o HHÌ"í 3.92 42.38 15.8399 3300 11366.5 13016
R\?D H~\1DUJU OHHIv¡ 4.l~ 42.12 1~.~ë,16 JJUU llJ6ë,.~ 1JOle~
f:'t.;'1' H\'\iU030 HOUk 0.19 l;!.H 0.964245 3300 113G8.S 13 (I H:
E'i.L::;I_, R'=dd1w,J E'cn ElLL1Lr= E'11r=......... .1135:L5
Last Readinq for Entire File...........13050.5
)
)
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......03/04/1B
Maximum Physical kecord..65535
File Type................ LO
NexL File Nams......... ..3T3LID.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation.... ...03/04/18
Maximum Physical Record..65535
File Type................LO
Previous file Name... ....813L11:3.004
Comment Reco nj
['ILl!.: ¡¡SADER
FILE NUMBEE:
RAW MAD
Curve,s and loc¡
DEPTH INCREMENT:
MAD RUN NLIMBEE:
MAD PASS NUMBER:
+I
FILE', SUMMARY
VENDOR TOOl, CODE
GR
RAT
I\PD
RPM
kPS
FET
RPX
5
header data far each pass of each run in separate files.
. t")OOO
3
1
START DE,PTH
LL322.0
11362.0
11364.5
11364. b
11364. ~j
11364.5
11364. ,5
STOP DEPTH
13007.5
13041.0
13019.0
13019.0
13019.0
13019.0
13019.0
ò
.,
+I
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP L,OG INTERVAL (FT):
l:3ü'l"l'OM LOG IN'l'I:>;kVAL (1::''1'):
BIT EOTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMU¡V¡ ANGLE:
MAX1HU¡V¡ ANGLE:
25-cTAN-03
Insite
4.3
Hemory
BObO.O
113~)O. 0
1305Ci.Ci
tU.\)
93.6
II
TOOL STRING (TOP TO
VENDOR TOOL CODE
GtvI
EWR4
·S
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG. RESIS. 4
TOOL NUMOER
82758
125631
H
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
3.750
11068.0
BOREHOLE CONDITIONS
IvIUD TY PE:
tvIUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUlì I:-'H:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
Flc' Pre,
S.GO
-:;. (I
2JOUU
.0
RSSISTI'/ITY (()HI'-1r'-1) ~n..T TEMPER.ll\TURS (DEGE']
)
)
HUD A'r MEASURE D TEHPERA.TURE (HT):
HUD AT' HAX CIRCULJ\TING TERHPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.0'10
.0:20
.100
.060
75.0
158.9
75.0
I!.) . ()
#
NEUTRON TOOL
MATRIX:
MATRIX m:N~)ITY:
HOI,.,8 CORRECT ION (Un;
ti
TOOL STANDOFF (IN):
~,hrR FI:;~:OUf':I\ICY (I-I?,):
REHARKS;
$
if
Data formaL SpccificaLiorl Eccord
Da t.-=¡ Re.o:-:e, l~,j 'T'ype.................. (ì
Dat'::l Sp(-;)ci ficati.on Block Type..... 0
Logging Direction........... ..... . Down
Optical log depth units... ....... .Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record...... .......Undefined
Absent value......................-999
Depth Units... . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Nälne Service Order Units Size N~)am RE:P Code Offs8L Channc:l
DEprr FT 4 1 68 0 1
RAT HAD031 F'1' I H 4 1 68 4 2
GR MAD031 API 4 1 68 8 3
F\ [CoX Hl\D031 om'IM 4 '1 68 1? 4
RPS MADU]l OHMM 4 1 68 16 ,I::)
RPt->1 Hl\D031 OHfv!M <1 1 68 ~~ 0 (3
RFD Ml-\D031 OHMH <1 1 6tJ 24 7
FE. l' HAD031 HOUR 4 1. 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEFT F'I' 11322 13041 12181. 5 3439 11322 13041
RAT HAD031 F'I'/H 6!j) . 28 96b.) 821.62,1 3339 11362 13041
GR MAD031 API 23.97 323.22 65.4128 3372 11322 13007.5
RI:-'X MAD031 OHMM 3.69 27.48 10.08T7 3310 11364.5 .1.3019
RFS MAD031 OHMM 3.83 29.51 12.2195 3310 11364.5 13019
RP¡V¡ MAD031 OIIMr>1 3.% 33.46 13.5204 3310 11364.5 1301')
R£'D HAD031 OHM\v¡ 4.09 ~-)/ . 02 15.1126 J~no 11364. S 13019
fE'l' MAD031 HOUR 0.4956 52.122 20.7829 3310 11364.5 13019
E'lr:,,;I.. Rfo~ddl[l<~1 ['<~r: E:[¡I_i.[(~ fll",.. _...... .11322
Last Reading For Entire E'ile...........13041
file T.t:üilcr-
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date ot Generation.......03/04/18
Maximum Physical Record..G5535
file Type................ LO
Next file Name...... .....81'SL18.006
Phvsical EOF
Tape Trailer
Service name............ .LIST2E
Da t e. . . . . . . . . . . . . . . . . . . . . 03/04/ l:'?,
()ri'~1in.................. .S'l'S
Tape Name. .... ...... ... ..UNKNOWN
c () ~ 1 ~ .i ¡ 1 \J. d L"~ \_H L I'~ u ~ í J_)(:; r. . . . . . c: 1
) )
Next: Tape Name.......... .IJNE-(N(MN
Comments................ .8TS LIS Writinq Libnlry. Sc~ientific Technical Services
1\ee1 'J.' I ai 1 e[
Service I1arn'2~............. LT~)TPP,
Date..................... 03/04/18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Narnc................ UNKNOv'JN
COI1'tinuation Number...... 01
Next Eee1 Name...........UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS Writing L:ibrary. Scienti fic Technical Services
Physic,:Ü EOf'
Physical E,OF
F,nd ot.LIS rile