Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
196-191
David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 07/14/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL FTP Folder Contents: Log Print Files and LAS Data Files: Well API # PTD # Date Log Type MPU B-13 500292134800 185-093 6/25/21 IPROF MPU E-12 500292326200 205-067 6/21/21 IPROF MPU J-27 500292355700 215-153 6/4/21 Multi Finger Caliper MPU K-06 500292272500 196-191 3/14/21 Leak Detect Log MPU L-29 500292254300 195-009 6/23/21 Multi Finger Caliper Please include current contact information if different from above. Received By: 07/14/2021 37' (6HW By Abby Bell at 2:44 pm, Jul 14, 2021 Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE : 03/15/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU K-06 (PTD 196-191) Leak Detection Log 03/12/2021 Please include current contact information if different from above. PTD: 1961910 E-Set: 34782 Received by the AOGCC 03/15/2021 03/15/2021 1.Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Install Tubing Patch 2. Operator Name:4. Current Well Class:5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 10,195'N/A Casing Collapse Conductor N/A Surface 3,090psi Production 5,410psi Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. W ell Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. W ell Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Chad Helgeson Contact Name: Operations Manager Contact Email:Travis.Semmens@hilcorp.com Contact Phone: 907-777-8490 DOA for Chad Helgeson Date: 1-26-2021 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Travis Semmens COMMISSION USE ONLY Authorized Name: Authorized Signature: Authorized Title: 17.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Tubing Size: PRESENT WELL CONDITION SUMMARY Length Size 7,304'9,925' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0028232 196-191 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22725-00-00 Hilcorp Alaska LLC 7,043' 1,791 9,925' MILNE POINT / KUPARUK RIVER OIL 112' 112' 6.5# / L-80 / EUE 8rd TVD Burst 9,403' MD N/A 5,750psi 7,240psi 3,571' 7,302' See Schematic 74' 20" 9-5/8" 7" 3,716' 10,162' 1/30/2021 2-7/8" Perforation Depth MD (ft): See Schematic MILNE PT UNIT K-06 C.O. 432D Versatrieve Packer and N/A 9,774 MD / 6,999 TVD and N/A 3,751' 10,191' No No Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 11:50 am, Jan 26, 2021 321-053 Digitally signed by David Gorm (2606) DN: cn=David Gorm (2606), ou=Users Date: 2021.01.26 10:59:14 -09'00' David Gorm (2606) ; ADL0375133 DLB 10-404 DSR-1/27/21 X DLB 01/26/2021 MGR27JAN21Comm. 1/27/21 dts 1/27/2021 JLC 1/27/2021 RBDMS HEW 1/29/2021 Tubing Patch Well: MPU K-06 Date: 01/25/2021 Well Name: MPU K-06 API Number: 50-029-22725-00-00 Current Status: Shut In - ESP Producer Pad: K-Pad Estimated Start Date: January 30th, 2021 Wellwork unit: SL Reg. Approval Req’d? Yes Date Reg. Approval Rec’vd: Regulatory Contact: Tom Fouts Permit to Drill Number: First Call Engineer: Travis Semmens (907) 777-8490 (O) (907) 297-9672 (M) Second Call Engineer: David Haakinson (907) 777-8343 (307) 660-4999 AFE Number: Job Type: Tubing Patch Current Bottom Hole Pressure: 2,471 psi @ 6,512’ TVD ESP Gauge (1/25/2021) | 7.0 PPG Maximum Expected BHP: 2,471 psi @ 6,512’ TVD Stable SBHP | 7.0 PPG MPSP: 1,791 psi Gas Column Gradient (0.1 psi/ft) Max Inclination 4° @ patch set depth MIN ID: 2.441” to patch set depth Brief Well Summary K-06 is an ESP well that is perforated in the Kuparuk B7 and C sands. In December, 2000 a plug was set to shut off production from the B7 which resulted in a large decrease in water rate. The following production from 2011-2015 out of the C sand was consistent averaging 70 bopd. The tubing in this well is in poor condition, however the ESP is functional and there is only one known hole in the tubing. Before investing in a workover or a supporting injector the well should be put on production to verify the rates seen in 2015. This well is likely to continue strong production into the future if injector support is added to the fault block. Notes Regarding Wellbore Condition x Hilcorp Alaska seeks approval to return MPU K-06 to production as an ESP producer after setting a tubing patch. x Tubing has up to isolated pitting with up to 69% wall penetrations. x With the K-pad header at 198 psi, and a 278 psi water column, the proposed patch will need to hold a maximum of 500 psi of pressure to surface fluids. x Well was SI on 2/24/2015 for low production due to a tubing leak. x Single tubing leak confirmed at 643’ MD on 3/26/2015 with a caliper. Objective x Set D&D tubing patch to enable well to surface fluids. Procedure Slickline 1. MIRU SL. PT lubricator to 200 psig low, 3,500 psig high. 2. RU LRS for pump support. 3. RIH w/ rope leak detect to leak interval and locate leak depth at ±643’ MD. 4. Flag wire and POOH. 5. Brush and Flush tubing at patch setting interval (±50’ up/down from leak point). 6. RIH with tubing slip-stop and set 15’ below leak depth (flagged wire) @ ±658’ MD. 7. Set D&D pack-off on slip-stop. Tubing Patch Well: MPU K-06 Date: 01/25/2021 8. RIH with tubing patch, with length of ±30’ element to element. a. Patch will be set from ±628’ - ±658’ MD in the 2.875” tubing, the minimum ID of the patch is 0.75”. 9. Land in lower D&D pack-off seal assembly. 10. RDMO. 11. Turn well over to operations. a. Call Centrilift representative to assist with the ESP startup. Attachments: 1) Current Schematic 2) Proposed Schematic _____________________________________________________________________________________ Revised By: TDF 1/25/2021 SCHEMATIC Milne Point Unit Well: MPU K-06 Last Completed: 7/26/2007 PTD: 196-191 TD =10,195’ (MD) / TD = 7,304’(TVD) 20” KB Elev.: 63.5’/ GL Elev.: 27.9’ (Nabors 27E) 7” 9 3 5 6 7 &8 10 12 & 13 14 15 9-5/8 ” 1 2 PBTD =9,925’(MD) / PBTD = 7,043’(TVD) 4 11 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 9-5/8" Surface 40 / L-80 / BTCM 8.835 Surface 3,571’ 7" Production 26 / L-80 / BTCM 6.276 Surface 10,191’ TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 9,403’ 4-1/2” Screens 12.6 / L-80 / EUE 8rd 3.958 9,774’ 9,910’ JEWELRY DETAIL No Depth Item 1 141’ STA 2: 2-7/8" x 1" KBMM GLM w/ DPSOV 2 9,163’ STA 1: 2-7/8" x 1" KBMM GLM w/ DGLV 3 9,304’ 2-7/8” XN-Nipple (2.205 No-go ID) 4 9,347’ Discharge Head: 5 9,348’ Pump: SXD 137 P17 6 9,367’ Gas Sep.: GRSFTXAR 7 9,372’ Upper Tandem Seal: 8 9,379’ Lower Tandem Seal: 9 9,386’ Motor: KMH 152 HP / 2,325V / 40A 10 9,399’ Pumpmate Sensor and Centralizer:Bottom @ 9,403 11 9,774’ Versatrieve Packer 12 9,826’ Halco Poromax Screens:Bottom @9,868’ 13 9,868’ Halco Poromax Screens:Bottom @9,909’ 14 9,910’ Bullnose Plug 15 9,925’ CIBP: Depth is ELMD PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk Sands 9,863’ 9,883 7,062’ 7,077’ 20’ 6/24/2001 Open 9,852’ 9,912’ 7,055’ 7,098’ 60’ 1/13/1997 Open 9,940’ 9,947’ 7,118’ 7,123’ 7’ 1/13/1997 Isolated Ref Log: GR / CCL / 1/12/97. 4-12/” gun @ 5 spf. OPEN HOLE / CEMENT DETAIL 20" Cmt w/ 250 sks of Arcticset I in 24” Hole 9-5/8" Cmt w/ 1,105 sks PF “E”, 700 sx Class “G” in 12-1/4” Hole 7” Cmt w/ 447 sks Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 400’ Max Hole Angle = 60.4 deg. @ 7,046.72’ Max Hole Angle through perforations = 43 deg. TREE & WELLHEAD Tree Cooper 2-9/16” – 5M Wellhead 7-1/16” 5M FMC Gen 5A, w/ 3” Baker Tbg. Hngr., 3” LH Acme Top, w/ 250-4 Pkt, CIW-H BPVT GENERAL WELL INFO API: 50-029-22647-00-00 Drilled & Cased by Nabors 27E - 1/5/1997 Completed with ESP by Nabors 4ES – 1/14/1997 Set Bridge Plug by Nabors 4ES - 12/4/2000 ESP Changeout by Nabors 4ES – 12/5/2000 ESP Changeout by Nabors 4ES – 6/25/2001 ESP Changeout by Nabors 4ES – 9/5/2004 ESP Changeout by Doyon 14 – 3/27/2005 ESP Changeout by Nabors 3S – 7/26/2007 _____________________________________________________________________________________ Revised By: TDF 1/26/2021 PROPOSED Milne Point Unit Well: MPU K-06 Last Completed: 7/26/2007 PTD: 196-191 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 9-5/8" Surface 40 / L-80 / BTCM 8.835 Surface 3,571’ 7" Production 26 / L-80 / BTCM 6.276 Surface 10,191’ TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 9,403’ 4-1/2” Screens 12.6 / L-80 / EUE 8rd 3.958 9,774’ 9,910’ JEWELRY DETAIL No Depth Item 1 141’ STA 2: 2-7/8" x 1" KBMM GLM w/ DPSOV 1B ±628’ 30’ Tubing patch: ID= 0.75”, Btm @ ±658’ 2 9,163’ STA 1: 2-7/8" x 1" KBMM GLM w/ DGLV 3 9,304’ 2-7/8” XN-Nipple (2.205 No-go ID) 4 9,347’ Discharge Head: 5 9,348’ Pump: SXD 137 P17 6 9,367’ Gas Sep.: GRSFTXAR 7 9,372’ Upper Tandem Seal: 8 9,379’ Lower Tandem Seal: 9 9,386’ Motor: KMH 152 HP / 2,325V / 40A 10 9,399’ Pumpmate Sensor and Centralizer: Bottom @ 9,403 11 9,774’ Versatrieve Packer 12 9,826’ Halco Poromax Screens: Bottom @9,868’ 13 9,868’ Halco Poromax Screens: Bottom @9,909’ 14 9,910’ Bullnose Plug 15 9,925’ CIBP: Depth is ELMD PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk Sands 9,863’ 9,883 7,062’ 7,077’ 20’ 6/24/2001 Open 9,852’ 9,912’ 7,055’ 7,098’ 60’ 1/13/1997 Open 9,940’ 9,947’ 7,118’ 7,123’ 7’ 1/13/1997 Isolated Ref Log: GR / CCL / 1/12/97. 4-12/” gun @ 5 spf. OPEN HOLE / CEMENT DETAIL 20" Cmt w/ 250 sks of Arcticset I in 24” Hole 9-5/8" Cmt w/ 1,105 sks PF “E”, 700 sx Class “G” in 12-1/4” Hole 7” Cmt w/ 447 sks Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 400’ Max Hole Angle = 60.4 deg. @ 7,046.72’ Max Hole Angle through perforations = 43 deg. TREE & WELLHEAD Tree Cooper 2-9/16” – 5M Wellhead 7-1/16” 5M FMC Gen 5A, w/ 3” Baker Tbg. Hngr., 3” LH Acme Top, w/ 250-4 Pkt, CIW-H BPVT GENERAL WELL INFO API: 50-029-22725-00-00 Drilled & Cased by Nabors 27E - 1/5/1997 Completed with ESP by Nabors 4ES – 1/14/1997 Set Bridge Plug by Nabors 4ES - 12/4/2000 ESP Changeout by Nabors 4ES – 12/5/2000 ESP Changeout by Nabors 4ES – 6/25/2001 ESP Changeout by Nabors 4ES – 9/5/2004 ESP Changeout by Doyon 14 – 3/27/2005 ESP Changeout by Nabors 3S – 7/26/2007 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /C~./~/ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items- Pages: GraYScale, halftones, pictures, graphs, charts - Pages: ,.~,~ Poor Quality Original- Pages: · Other - Pages: DIGITAL DATA [] Diskettes, No. Other, No/Type .OVERSIZED Logs of various kinds Other COMMENT~: Scanned by: ~ve,~ TO RE-SCAN Notes: m_ c~ ...,.. ,.. ,.,~,..! l.~,,- .-, .... ..~ .~,.~ n=mthn Nathan Lowell Dele: /s/ . • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 5t FEB UI Mr. Tom Maunder 4 q ( o f ' Alaska Oil and Gas Conservation Commission (1 , 333 West 7 Avenue "V Anchorage, Alaska 99501 (�� 1' Subject: Corrosion Inhibitor Treatments of MPK -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPK -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPK 10/29/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal MPK -02 1960810 50029226750000 0.2 NA 02 NA 5.1 9/5/2011 MPK -05 1960680 50029226700000 1.9 NA 1.9 NA 17.9 8/24/2011 - > MPK-06 1961910 50029227250000 1.5 NA 1.5 NA 8.5 8/27/2011 MPK-09 2050140 50029232470000 1.9 NA 1.9 NA 12.8 8/24/2011 MPK -13 1960400 50029226550000 1.7 NA 1.7 NA 14.5 8/24/2011 MPK -17 1960280 50029226470000 1 NA 1 NA 2.6 8/24/2011 MPK -18A 1970270 50029227330100 4.6 NA 4.6 NA 23.8 8/27/2011 MPK -21A 2031620 50029227180100 0.4 NA 0.4 NA 6.9 10/29/2011 MPK -22 2050220 50029232490000 2 NA 2 NA 5.1 8/27/2011 MPK -25 1960320 50029226500000 4.2 NA 42 NA 30.6 8/24/2011 MPK -30 1961680 50029227110000 1.5 NA 1.5 NA 17.0 8/25/2011 MPK-33 1962020 50029227290000 1.7 NA 1.7 NA 15.3 8/24/2011 MPK -34 1961690 50029227120000 2.5 NA 2.5 NA 25.5 8/25/2011 MPK-37 1960760 50029226740000 2 NA 2 NA 17.0 8/24/2011 MPK -38 1960300 50029226490000 3.2 NA 3.2 NA 15.3 8/25/2011 MPK -43A 1970410 50029227380100 1.7 NA 1.7 NA 13.6 9/16/2011 ~ ~.~,.v~r ~ ~w E- STATE OF ALASKA SUN ® Q$ ~~b•l/d9 ALAS~IL AND GAS CONSERVATION COMM~N REPORT O F SUNDRY 1A~~IS~.S~R~~ssion 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ late ^'a; ^ Other ~ ACID Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: ~; Permit to Drill Number: Name: Development Exploratory `~ 196-1910 3. Address: P.O. Box 196612 Stratigraphic Service F-' 6. API Number: Anchorage, AK 99519-6612 50-029-22725-00-00 7. KB Elevation (ft): 9. Well Name and Number: 61.5 KB ~ MPK-06 8. Property Designation: 10. Field/Pool(s): '~ ADLO-028232 w MILNE POINT Field/ KUPARUK RIVER OIL Pool 11. Present Well Condition Summary: Total Depth measured 10195 feet Plugs (measured) 9925' true vertical 7304.57 feet Junk (measured) None Effective Depth measured 9925 feet true vertical 7107 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 74' 20" SURFACE - 112' SURFACE - 112' SURFACE 3716' 9-5/8" 40# L-80 SURFACE - 3751' SURFACE - 3570' 5750 3090 PRODUCTION 10162' 7" 26# L-80 SURFACE - 10191' SURFACE - 7302' 7240 5410 ~1NE,~ JUN fl 9 200$ Perforation depth: Measured depth: SEE ATTACHED - _ _ _ - True Vertical depth: _ _ _ - = Tubing: (size, grade, and measured depth) 2-7/8" 6.5# L-80 SURFACE - 9403' 0 0 - Packers and SSSV (type and measured depth) HALIBURTON VERSATRIEVE PKR 9774' 4-1/2" 29# HALCO POROMAX SCREENS 9826'-9909' 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 13 21 359 209 Subsequent to operation: 13 21 367 208 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~', Development ~' Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~' Gas WAG (~ GINJ ' WINJ WDSPL ~' 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Ga y Pr t51e Title Data Management Engineer Signature Phone 564-4944 Date 6/3/2008 Form 10-404 Revised 04/2006 ~ Submit Origins Onl~ MPK-06 196-191 o~oG eT-rerrunn~r~'r Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 1/12/96 PER 9,846. 9,906. 7,050.2 7,093.39 1/12/97 PER 9,852. 9,912. 7,054.51 7,097.71 1/13/97 PER 9,940. 9,947. 7,117.89 7,122.94 12/4/00 BPS 9,925. 10,189. 7,107.08 7,300.15 6/24/01 PER 9,863. 9,883. 7,062.43 7,076.82 AB ABANDONED _ PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED _ STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN _ OH OPEN HOLE • • • MPK-06 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY __~ 6/1/2008. T/I/0=350/200/0. (Acid treatment). Spear into tbg w/ 10 bbls crude followed by 3 ; bbls 60/40 meth. Pump 10 bbls 7.5% DAD acid & 3 bbls 60/40 meth down tbg. Spot acid at the screens w/ 55 bbls crude pumped. Let soak for 5 minutes. Pump 7 more bbls crude to flush acid thru the screens. Turn well over to DSO. FW H P=300/320/0. FLUIDS PUMPED BBLS 10 7.5% DAD ACID 6 60/40 METH 72 CRUDE 88 TOTAL ~ RECE\VED . STATE OF ALASKA . ð'-/S--fJ'1- ALASKA Oil AND GAS CONSERVATION COMMISSION Jt..c¡h.v AUG 1 4 Z007 REPORT OF SUNDRY WELL OPERATIONS Alaska Oil & Gas Cons. Commission . 1. Operations Performed: o Abandon ~ Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Alter Casing ~ Pull Tubing o Perforate New Pool o Waiver ~ Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension Change out ESP - 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ~ Development o Exploratory 196-191 - 3. Address: o Service o Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22725-00-00 - 7. KB Elevation (ft): KBE = 61.50' 9. Well Name and Number: MPK-06 - 8. Property Designation: 10. Field 1 Pool(s): ADL 028232 / Milne Point Unit 1 Kuparuk River Sands , 11. Present well condition summary Total depth: measured 10195 ' feet true vertical 7305 . feet Plugs (measured) 9925' Effective depth: measured 9925 feet Junk (measured) NIA true vertical 7107 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 74' 20" 112' 112' 1490 470 Surface 3716' 9-518" 3751' 3570' 5750 3090 Intermediate Production 10162' 7" 10191' 7302' 7240 5410 Liner SCANNED AUG 2 02007 Perforation Depth MD (ft): 9836' - 9947' Perforation Depth TVD (ft): 7043' - 7123' 2-7/8",6.5#, L-80 9403' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): Halliburton Versatrieve Packer, 9774' 4-1/2" 29# Halco Poromax Screens 9826' - 9909' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Representative Daily AveraQe Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure TubinQ Pressure Prior to well operation: 0 0 0 240 0 Subsequent to operation: 133 13 724 0 204 14. Attachments: o Copies of Logs and Surveys run 15. Well Class after proposed work: ~ Daily Report of Well Operations o Exploratory ~ Development o Service 16. Well Status after proposed work: ~ Well Schematic Diagram kí ~ 'å.Oil 0 Gas 0 WAG 0 GINJ DWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the bE'!§( ~my knowledge. SUndry Number or N/A if C.O. Exempt: Contact Bryan McLellan, 564-5516 N/A Printed Name Sondra Stewman Title Technical Assistant Si~ f""-~~- Prepared By Name/Number: - Phone 564-4750 Date (¥- í o-(fl Sondra Stewman, 564-4750 . . Form 10-404 Revised 04/2006 0 RIG I N A L .. RBDMS BFL AUG 1 ., 2007 Submit Onglnal Only TREE: 2-9/16" - 5M cooper. WELLHEAD: 7-1/16" 5M FM 5A ACTUATOR: Baker I Tub hgr. 3" LH 3" LH Acme top, w/250-4 Pkt., CIW-H BPVT Conductor I 112' KOP @ 400 Max Hole Angle: 60.4" @ 7046.72' MO Angle thru perfs = 43" 95/8" 40# L-30 Surface Casing 13750' MD i 27/8" 6.5# EUE 3RO. L- 30 TUBING DRIFT 10: 2.441" CAPACITY: 0.00579 7" 26 ppf, L-80, Stre. prod. casing (drift 10 = 6.151", cap. = 0.0383 bpf) Stimulation Summary none Perforation Summary Ref log: GR 1 CCL 1/12/97 Size SPF Interval (NO) C -Sands 4.5" . 5 9,836'-9,856' 7,043'-7,057' 4.5" 5 9,852'-9,912' 7,055'-7,098' B -Sands 4.5" 5 9,940'-9,947' 7,124'-7,126' 'Shot 6/24/01 .. o Elev. = 61.5' (N27E) Or! L Elev. = 27.9' (N27E) RKB BF. = 20.21 (4-ES ) Cameo 2-7/8" x 1" I sidepocket KBMM GLM 141 ' Camco 2-7/8" x 1" sidepocket KBMM GLM I I 9,304' 9,163' I I I 2-7/8" XN nipple (10 2.205") Pump, 151 Stg. GC1700, I 9,347' Model- GPMTAR 1:1 . Intake 9,348' MO = 6,320' TVO Tandem Seal Section Model GSB3 DB UTIL T 9,371' Motor, 152HP, 2325 V, 9,385' 40 amp, Model KMH Pump mate w/Centralizer I 9,401' Halliburton Versatrieve Packer @ 9,774' Screens From 9,826' to 9909' 7" HES (CIBP) @ 9925' ELMO 7" float collar (PBTO) 7" 26#/ft L-30 BTRS 110,189' Mol 110,191' Mol DATE EV.BY COMMENTS 12/07/00 MOO Set bridge plug 1 ESP RWO 4-ES MILNE POINT UNIT 06/27/01 B. Hasebe Reperf 1 ESP RWO 4-ES WELL K-6 09/03/04 JRC RWO 4_ES API NO: 50-029-22725 03/29/05 JRC RWO Doyon 14 07/29/07 BDB RWO Nabors 3S / Add Screens BP EXPLORATION (AK) . . legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER NABORS ALASKA DRilLING I NABORS 3S Start: Rig Release: Rig Number: 7/19/2007 7/26/2007 Spud Date: 12/21/1 996 End: 7/19/2007 18:00 - 23:30 5.50 RIGD P PRE RD off of well slot MPF-81. Scope and lower the Derrick. Trucks arrive on location at 22:30 hrs. Hold PJSM with all personnel involved. Back off of well slot MPF-81 with the WSL, Tourpusher and Pad Operator in witness. 23:30 - 00:00 0.50 MOB P PRE Move the Rig and its Modules to MPK-06. 7/20/2007 00:00 - 02:30 2.50 MOB P PRE Continue moving from MPF-81 to MPK-06. 02:30 - 16:00 13.50 RIGU P PRE ,Arrive on MPK-Pad. Spot the Camp, Shop and Generator I Modules. Layout Herculite and back the Carrier over the well with the WSL, Tourpusher and Pad Operator in witness. Continue RU on well slot MPK-06 with the Pits and Pipe Shed Modules. RU Handy Berm. Raise and scope Derrick at 11 :00 hrs. The Rig was accepted at 13:00 hrs on 7/20/2007. RU Tiger Tank and hard line. RU circulating lines to the Tree and install second Annulus valve. 16:00 - 16:30 0.50 KILL P DECOMP i Pre-kill safety meeting with all personnel. 16:30 - 17:30 1.00 WHSUR P DECOMP PU Lubricator with Well Support Techs and pull BPV. Tubing = I 500 psi, IA = 200 psi, OA = 185 psi. LD Lubricator. 17:30 - 18:30 I 1.00 KILL P DECOMP Pressure test all surface lines to a closed choke to 3,500 psi - OK. Pressure test the line to the Tiger Tank to 500 psi - OK. 18:30 - 20:30 2.00 KILL P DECOMP . Bleed gas pressure off of the well to 0 psi (happened really I quick < 5 mins). Break circulation with hot seawater down the Tubing taking returns up the Annulus to the Tiger Tank at a rate of 3 bprn 1 550 psi. Got crude returns to surface after 80 bbls away and pumped an additional 20 bbls with good, crude returns on surface. Shut down the pump and close in the Annulus. Attempt to bullhead down the Tubing at 1 bpm and pressured up to 2,300 psi after 8 bbls away. Suspect the perfs are cornpletely sanded off. Shut down and discuss with Anchorage Engineering. Plan forward is to circulate the well conventionally until clean seawater seen on surface. Wait 1-2 hrs and allow the seawater to swap with the Rat Hole fluids. I Perform another full circulation with seawater until clean returns seen on surface. Well Support Techs arrive on location to service/grease the inner Annulus Valve. 20:30 - 22:00 1.50 KILL C OECOMP Break circulation with hot seawater down the Tubing taking returns up the Annulus to the Tiger Tank at a rate of 3.5 bpm / 530 psi. Pumped a total of 284 bbls with clean seawater I returns seen on surface. Saw clean seawater at 186 bbls, continued pumping additional 30 minutes to ensure crude is 122:00 - 00:00 displaced. 2.00 KILL C OECOMP Wait to allow -600' of crude below empty pocket mandrel to migrate up the annulus and seawater to drop. Rig crews installed the kill line during this time. 7/21/2007 00:00 - 04:00 4.00 KILL C DECOMP Wait on seawater. Wait to allow -600' of crude below empty pocket mandrel to migrate up the annulus and seawater to drop. Rig crews installed the kill line, elephant trunk, standpipe, and drain hoses during this time. 04:00 - 06:30 2.50 KILL C DECOMP Break circulation with hot seawater down the Tubing taking returns up the Annulus to the Tiger Tank at a rate of 3.5 bpm / 800 psi. Pumped a total of 340 bbls with clean seawater returns seen on surface. Got returns and saw clean seawater immediatley. No crude returns during this circulation. Had 1 x ! 1 returns during circulation (no losses). Blow down lines and Printed: 8/2/2007 1 :40:42 PM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER NABORS ALASKA DRILLING I NABORS 3S Start: Rig Release: Rig Number: Spud Date: 12/21/1996 End: 7/19/2007 7/26/2007 DECOMP RD circulation lines. Tbg pressure = 0 psi, IA pressure = slight vac. Service and grease the Rig. PU T-bar and dry rod TWC with FMC rep. RU Test Equipment. Pressure test the TWC from below to 1,000 psi for 10 charted mins - OK. Pressure test the TWC from above to 3,500 psi for 10 charted mins - OK. RD Test Equipment. DECOMP I PJSM. Bleed the void with FMC rep - gassed up with about 50 psi (no hydraulic fluid). ND Tree and Adapter Flange together and set back in the Cellar. Screw in the 3" LH Acme XO onto the Hanger to ensure the threads are good - OK (9 turns). DECOMP PJSM. PU BOPE from Cradle and NU BOPE to Wellhead. Connect Choke, Kill and Koomey Lines. Attempt to gravity feed the IA but the well is full of seawater. DECOMP Pressure test BOPE to 250 I 3,500 psi per BP I AOGCC Regulations. The state's right to witness the BOPE test was waived by AOGCC inspector John Crisp on 7/20/2007. Maintain the IA open and monitor throughout the test. DECOMP Service the Rig and pre-tour checks. DECOMP RD Test Equipment. Drain the BOP Stack. RU 3 1/2" Handling Equipment in preparation for the Landing Joint. DECOMP PU the Opso-Lopso and screw into the Hanger with 3" LH Acme bored out XO. PU Lubricator and Polished Rod. Pull the TWC with the Well Support Techs. LD Lubricator and Opso-Lopso. DECOMP PU 3 1/2" Landing Joint and MU 3" LH Acme XO. Screw into the Hanger with 9 turns. BOLDS with FMC rep. Pull on the Tubing Hanger and it came free at PUW = 82K. Pull the Hanger to the Floor with a PUW = 78K. Fill the well with seawater with 6.3 bbls. Make a surface check on the ESP and it appears to be burnt out. OECOMP Break out and lay down Hanger. RU to POOH with existing 2 7/8" ESP Completion. RU Spooling Unit and 2 7/8" Handling Equipment. DECOMP POOH with existing 2 7/8" ESP Completion standing back the Tubing in the Derrick. Maintaining continuous hole fill while POOH. DECOMP Arrive at the splice in the ESP Cable. Cut the ESP Cable and test with Centrilift rep. Change out ESP Spools. OECOMP Resume POOH with existing 2 7/8" ESP Completion standing back Tubing in the Derrick and maintaining continuous hole fill with seawater. 100 stands (of 147 total) out of the hole at 05:00 hrs. DECOMP On surface with ESP Assembly. PJSM with Centrilift rep. Cut ESP Cable and send over the Sheave. Break down and lay down ESP Components. Recovered a total of 155 LaSalle Clamps, 2 Flat Guards and 4 Protectolizers. Clear and clean Rig Floor. PU Running Tool and set Wear Ring. PU and MU 27/8" Muleshoe. TIH with Muleshoe Assembly on 27/8" Tubing from the Derrick. TIH with muleshoe picking up singles from pipeshed. 7/21/2007 04:00 - 06:30 2.50 KILL C 06:30 - 07:00 0.50 WHSUR P 07:00 - 07:30 0.50 WHSUR P 07:30 - 08:30 1.00 WHSUR P DECOMP DECOMP DECOMP 08:30 - 10:00 1.50 WHSUR P 10:00 - 14:00 4.00 BOPSU P 14:00 - 18:00 4.00 BOPSU P 18:00 - 18:30 18:30 - 19:30 0.50 WHSUR P 1.00 WHSUR P 19:30 - 20:30 1.00 WHSUR P 20:30 - 21 :00 0.50 PULL P 21 :00 - 22:30 1.50 PULL P 22:30 - 00:00 1.50 PULL P 7/22/2007 00:00 - 01 :00 I 1.00 PULL P 01 :00 - 10:00 9.00 PULL P 10:00 - 14:00 4.00 PULL P 14:00 - 14:30 14:30 - 20:30 0.50 WHSUR P 6.00 CLEAN P ! 2.00 ¡CLEAN P CLEAN CLEAN 20:30 - 22:30 CLEAN Printed: 8/2/2007 1 :40:42 PM . .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 7/22/2007 MPK-06 MPK-06 WORKOVER NABORS ALASKA DRILLING I NABORS 3S r~j!'R~ol~S 2230 - 23~'; 0:0, CLEA~ p , i 23:00 - 23:30 [ 0.50 I CLEAN P 23:30 - 00:00 i 0.50 i CLEAN P 00:00 - 00:30 I 0.50 I CLEAN P 00:30 - 02:30 I 2.00 I CLEAN P 02:30 - 04:00 i 1.50 I CLEAN P 04:00 - 05:00 I 1.00 CLEAN P 05:00 - 06:00 I 1.00 CLEAN P . Start: Rig Release: Rig Number: Spud Date: 12/21/1996 End: 7/19/2007 7/26/2007 CLEAN 7/23/2007 CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN CLEAN 06:00 - 08:00 2.00 CLEAN P CLEAN 08:00 - 14:00 6.00 CLEAN P CLEAN 14:00 - 14:30 I 0.50 CLEAN P CLEAN 14:30 - 15:00 0.50 CLEAN P CLEAN 15:00 - 15:30 0.50 WHSUR P CLEAN 15:30 - 18:00 2.50 CLEAN P CLEAN 18:00 - 19:30 CLEAN P CLEAN 19:30 - 00:00 4.50 CLEAN P CLEAN 7/24/2007 00:00 - 02:00 2.00 CLEAN P CLEAN 02:00 - 06:00 4.00 CLEAN P CLEAN 06:00 - 06:30 0.50 CLEAN P CLEAN 06:30 - 08:00 1.50 CLEAN P CLEAN 08:00 - 09:30 1.50 CLEAN P CLEAN 09:30 - 12:00 2.50 CLEAN P CLEAN Establish circulation @ 9,813',3 BPM, 726 psi. Pressure test standpipe to 3,500 psi, good test. Tag fill at 9,815' and wash down to 9,844' with no losses. Reverse circulate up tubing to clean out fill @ 9,844'. Reverse circulate out sand @ 9,844'. Attempt to break out Head Pin, gas breaking out in Tubing, make up Head Pin. Reverse circulate out gas, 1 complete surface to surface circulation. Verify well dead. Wash & clean with mule shoe through fill to 9,892' , total losses, not able to keep up at 3 BPM. Break out TIW and head pin, POOH above perforations and wait on seawater. Pump seawater down the IA with the Charge Pump at a rate of 0.75 bpm. After 45 mins of pumping down the Annulus and sitting above the perfs, RIH and dry tag top of fill 2' in on Joint #317 = 9,910' 3SMO. Re-tag to verify depth. POOH to above the perfs and continue pumping down the IA. Shut down the Charge Pump and attempt to fill the well down the IA with the Rig Pump. Discuss with Anchorage Engineering and decision made to wait until morning call to collectively decide on the plan forward. Wait on seawater to arrive on location. Continue pumping down the IA with seawater. Attempt to fill the IA with seawater - no Joy, loss rate too high. Fill the IA with 10 bph while waiting. TOH with 2 7/8" Mule Shoe Cleanout Assembly standing back Tubing in the Derrick. Double displace the well with seawater while TOH. At 10:00 hrs, Schlumberger Slickline on location to service the GLMs. Pull existing OGLV and replace with new DGLV. Set new DPSOV into the empty GLM. Mark and flag the DPSOV with tape. On surface with the 2 7/8" Muleshoe. Break out and lay down the Muleshoe. PU and MU the 7" Scraper Assembly. Attempt to fill the hole with 90 bbls down the well - no Joy. PU 3 1/2" Landing Joint and pull Wear Ring. PU (2) 4-3/4" Drill Collars. Discuss with Anchorage Engineering and change BHA to include the 2 7/8" Muleshoe on bottom of the Scraper Assembly spaced out so that we can tag fill but not allow the Scraper itself to get in the perf interval. Wait on Baker rep to come out with extra BHA components. Make up Muleshoe, 3 Tubing Joints (for space out to Scraper), Scraper, and 3 x 43/4" Drill Collars to 205'. Run in hole with BHA# 3 scraping 7", 26#, Casing, filling hole at 20 bbllhr. RIH wI scraper and mule shoe to 9,910'. Tag fill on stand 156 (50' in @ 9,910'). Repeat tag to confirm. Fill hole @ 20 bph. POOH wI BHA #1 scraper assembly. Double-displace. Service rig and conduct derrick inspection. POOH wI BHA #1 scraper assembly. Double-displace. LD BHA #1. PJSM. PU 7" HES Po rom ax screens & HES Versatieve packer Printed: 8/2/2007 1 :40:42 PM . . -- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER NABORS ALASKA DRILLING I NABORS 3S Start: Rig Release: Rig Number: 7/19/2007 7/26/2007 Spud Date: 12/21/1996 End: CLEAN I P assembly. RUNCOjP RIH wi screens & packer assembly on 2-7/8" tubing. Fill hole @ 20 bph. Tag bottom @ 9910'. PUW = 66K and SOW = 37K. Pressure test surface lines to 3500 psi. 18:00 - 19:30 1.50 RUNCOjP RUNCMP Drop packer setting ball and pump 2 bpm @ 600 psi. Set packer top @ 9774'. Fill tubing and pressure test to 3150 psi. FilllA and pressure test to 500 psi. Calculated fluid level @ RUNCofp approx. 2000'. Pulled out of packer wI 82K. 19:30 - 20:30 1.00 RUNCMP Break out surface hose and safety valve. LD 18 jts excess tubing. 20:30 - 21 :00 0.50 RUNCOMP RUNCMP Service rig. Grease drawworks, blocks and crown. 21 :00 - 00:00 3.00 RUNcotp RUNCMP POOH wi 2-7/8" tubing and stand back in derrick. Triple-displace. 7/2512007 00:00 - 01 :30 1.50 RUNcor RUNCMP Finish POOH wI 2-7/8" tubing. 01 :30 - 02:30 1.00 RUNCO P RUNCMP LD HES packer setting tool. Clear floor. String ESP rope through sheave. Fill hole @ 20 bph. 02:30 - 06:00 3.50 RUNCO~P RUNCMP MU new ESP assembly and RIH wi 2-7/8" tubing. 06:00 - 12:00 6.00 RUNCO P RUNCMP RIH wi ESP on 246 joints 2-7/8" tubing. Fill hole @ 20 bph. I Check cable conductivity every 2000'. Fill tubing and flush pump at every check. 12:00 - 16:00 4.00 P RUNCMP Splice ESP control cable on joint 246. 16:00 - 18:00 2.00 P RUNCMP Finish RIH wI 2-7/8" ESP completion to 9403' on 295 joints tubing. Fill hole @ 20 bph. Check cable conductivity every 2000'. Fill tubing and flush pump at every conductivity check. 18:00 - 18:30 0.50 P RUNCMP PU 3-1/2" landing joint wI surface hose, TIW valve & FMC crossover. 18:30 - 19:00 0.50 P RUNCMP Flush ESP w/10 bbls seawater @ 42 spm & 1440 psi. Cut ESP cable & spool up. 19:00 - 20:30 1.50 P RUNCMP Make ESP cable splice at penetrator. Attempt to fill IA with seawater wlo success. 20:30 - 21 :00 0.50 RUNCMP Land tubing hanger wI PUW = 77K & SOW = 44K. LD landing joint. 21 :00 - 21 :30 0.50 RUNCMP Set TWC wI dry rod. Pressure test TWC from above to 1000 psi f/1 0 charted minutes - OK. Did not test from below due to lack of fluid column. 21 :30 - 00:00 2.50 RUNCO P RUNCMP ND BOPE. 7/26/2007 00:00 - 00:30 0.50 BOPSU P RUNCMP Finish ND BOPE. 00:30 - 02:30 2.00 WHSUR P RUNCMP NU tree. 02:30 - 04:00 1.50 WHSUR P RUNCMP Make final conductivity check on ESP - OK. Pressure test tubing hanger void to 5000 psi - OK. Pressure test tree wi diesel to 5000 psi for 10 charted minutes - OK. RD test equipment. 04:00 - 05:00 1.00 WHSUR P RUNCMP PU lubricator. Pull TWC. Install BPV. 05:00 - 06:00 1.00 WHSUR P RUNCMP Clean cellar & secure well. Release rig @ 0600 hrs 07/26/07. Printed: 8/2/2007 1 :40:42 PM Sent: Tuesday, July 31, 2007 11 :40 AM To: Maunder, Thomas E (DOA) Subject: RE: MPK-06 (196-191) Attachments: MPK-06 190-191.tif Tom. Here's the information you requested. Please advise if you require any further information. Thank you, Sondra ~ ~. ;Se:.s.ç., \k~ \0. \ \c W \,y- \...\ Ç)\-\ ~ "c CJ().\-(!: . . 'a:)-O'\ .$('/\\ "\I::., ,,,¥w __~_._..._..___.______.... From: Maunder, Thomas E (DOA) (mailto:tom.maunder@alaska.gov] Sent: Tuesday, July 31,20078:04 AM To: Stewman, Sandra D Subject: MPK-06 (196-191) Hi Sondra, Terrie had sent me the weekly rig workover completed report and this well was on it. I was/ooking at the file and there was a similar workover completed in September 2004. We have the 404 and drawing, however there is no daily summary. / was wondering if you might be able to pull the summary and send it over. Email is fine. Call or message with any questions. Thanks, Tom Maunder, PE AOGCC 51CANNED AUG 0 1 2007 7/31/2007 "J:r ) STATE OF ALASKA ') ALASKA OIL AND GAS CONSERVATION COI\,IIJlISSION REPORT OF SUNDRY WELL OPERATION~ECEJ\/ED APR 1 9 Z005 Change out ESP . . Alaska Iä ~~ t;ons. \,;omrUSSIOI o Ti~Q~~on a Repair Well 0 Plug Perforations 0 Stimulate a Pull Tubing 0 Perforate New Pool 0 Waiver o Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: a Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number: 196-191 6. API Number: 50-029-22725-00-00 99519-6612 KBE = 61.50' 9. Well Name and Number: MPK-06 ADL 028232 10. Field 1 Pool(s): Milne Point Unit / Kuparuk River Sands 8. Property Designation: 11. Present well condition summary Total depth: measured 10195 feet true vertical 7305 feet Plugs (measured) 9925' Effective depth: measured 9925 feet Junk (measured) NIA true vertical 7107 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 74' 20" 112' 112' 1490 470 Surface 3716' 9-5/8" 3751' 3570' 5750 3090 Intermediate Production 10162' 7" 10191' 7302' 7240 5410 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 9836' - 9947' 7043' - 7123' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 2-7/8",6.5#, L-80 9409' None 12. Stimulation or cement squeeze summary: Intervals treated (measured): SC,ANNED APR 2 5 200:i Treatment description including volumes used and final pressure: Oil-Bbl Prior to well operation: 142 Subsequent to operation: 171 14. Attachments: 0 Copies of Logs and Surveys run a Daily Report of Well Operations a Well Schematic Diagram Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casinq Pressure 68 707 240 30 445 40 TubinQ Pressure 211 210 13. 15. Well Class after proposed work: o Exploratory a Development 0 Service 16. Well Status after proposed work: a Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact David Reem, 564-5743 Printed Name Sondra Stewman Si9~~ Form 10-404 Revised 04/2004 Title Technical Assistant Phone 564-4750 :~.: ~ f'J l~ 1_ I I I --Prepared By Name/Number: DateO'-t,- L ð"~c::6sondra Stewman, 564-4750 R ßiìv1S il/~on'y c \. TREE: 2-9/16" - 5M Cooper ) WELLHEAD: 7-1/16" 5M FMC Gen 5A ACTUATOR: Baker I Tub hgr. 3" LH 3" LH Acme top, w/250-4 Pkt., CIW-H BPVT Conductor I 112' I· KOP @ 400 Max Hole Angle: 60.40 @ 7046.72' MD Angle thru perfs = 430 9 5/8" 40# L-80 Surface Casing 13750' MDI ~ 27/8" 6.5# EUE 8RD, L- 80 TUBING DRIFT 10: 2.441" CAPACITY: 0.00579 7" 26 ppf, L-80, Btrc. prod. casing (drift ID = 6.151", cap. = 0.0383 bpf) Stimulation Summary none Perforation Summary Ref log: GR / CCL 1/12/97 Size SPF Interval (TVD) C -Sands 4.5" * 5 9,836'·9,856' 7,043'-7,057' 4.5" 5 9,852'-9,912' 7,055'-7,098' - B -Sands 4.5" 5 9,940'-9,947' 7,124'-7,126' - *Shot 6/24/01 ~, Orip 1· Elev. = 61.5' (N27E) Ori6 ) Elev. = 27.9' (N27E) RKB BF. = 20.21 (4-ES ) Cameo 2-7/8" x 1" I side pocket KBMM GLM 151 ' Cameo 2-7/8" x 1" sidepocket KBMM GLM I I 9,313' 9,202' I I I 2-7/8" XN nipple (ID 2.205") Pump, 151 Stg. GC1700, I 9,353' Model - GPMTAR 1:1 Intake 9,374' MO = 6,738' TVD Tandem Seal Section Model GSB3 DB UTIL T 9,375' Motor, 152HP, 2325 V, 9,389' 40 amp, Model KMH I 9,4rQ~ Pump mate w/Centralizer Vi' 7" HES (CIBP) @ 9925' ELMD l 7" float collar (PBTD) 7" 26#/ft L-80 BTRS 110,189' MDI 110,191' Mol DATE ~EV.BY COMMENTS MILNE POINT UNIT 12/07/00 MDO Set bridge plug 1 ESP RWO 4-ES WELL K-6 06/27/01 B. Hasebe Reperf 1 ESP RWO 4-ES API NO: 50-029-22725 09/03/04 JRC RWO 4_ES 03/29/05 JRC RWO Doyon 14 BP EXPLORATION (AK) ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 3/19/2005 Rig Release: Rig Number: Spud Date: 12/21/1996 End: Pate ··Frorn·";··Tö Hours .. Task Code NPT phase .. DØscriþtion ÖfOperatiöns 3/23/2005 01 :30 - 03:00 1 .50 MOB P PRE Blow down floor - prepare to skid rig floor 03:00 - 04:00 1.00 MOB P PRE Skid rig floor from drlg position to move position 04:00 - 07:00 3.00 MOB P PRE Move rig off well K-09 - Move rig to K-06 07:00 - 08:00 1.00 RIGU P PRE Shim rig 08:00 - 08:30 0.50 RIGU P PRE Skid rig floor from move position to drlg position 08:30 - 09:30 1.00 RIGU P PRE Rig up floor - (accept rig @ 09:30 hrs) 09:30 - 11 :30 2.00 RIGU P DECOMP Prepare tree - Cellar to kill well - Moblize equip for well kill 11 :30 - 12:00 0.50 WHSUR P DECOMP Pull BPV with lubricator - 250 psi on annulus - 200 psi on tubing 12:00 - 14:00 2.00 RIGU P DECOMP Rig up hoses to bleed tank 14:00 - 16:30 2.50 CLEAN P DECOMP PJSM - Bleed annulus psi to zero - Bleed tubing psi to zero - Shut in monitor pressure 16:30 - 17:30 1.00 CLEAN P DECOMP Pump 55 bbls seawater down tubing @ 3 bpm 180 psi / 4 bpm 280 psi /4 bpm 550 psi - Shut in annulus - Bullhead 46 bbls down tubing @ 2 bpm 110 psi - 3 bpm 180 psi - 3 bpm 400 pressure increased to 2000 psi after 23 bbls pumped - Can't bullhead @ 1 bpm for additional 23 bbls - Shut down - Pressure holding 1900 psi - Open annulus and bleed off oil and pressure from 1900 psi to 0 psi - 17:30 - 20:00 2.50 CLEAN P DECOMP Displace well with 395 bbls seawater with 2 bbls of Safe Clean @ 3 bpm 1150 psi - taking returns to bleed tank - Shut in well for 15 mins monitor pressure - No pressure build up - Open well circulate additional 25 bbls seawater 3 bpm 1150 psi - Shut down well dead 20:00 - 21 :00 1.00 WHSUR P DECOMP Install TWC - Test back side to 1000 psi - Blow down - Rig down High pressure lines 21 :00 - 21 :30 0.50 WHSUR P DECOMP Nipple down Tree 21 :30 - 00:00 2.50 BOPSURP DECOMP PJSM - NU BOP's - Change rams to 31/2" X 6" on top - 2 7/8" X 5" on bottom - Change out choke spool - 3/24/2005 00:00 - 02:00 2.00 BOPSUP P DECOMP NU BOPs - Change rams - Change out choke spool 02:00 - 03:00 1.00 BOPSUP P DECaMP Tighten up choke spool 03:00 - 14:00 11.00 BOPSUP P DECOMP Testing BOPs - Test bag to 250 low 2500 high 5 mins each test - Test choke manifold - HCR Choke / Kill - Manual Chole / Kill valves - Floor safety valves - Upper / Lower IBOP valves - 250 low 3500 high - 5 mins each test - ManuallBOP valve failed - Change out IBOP valve - Retest 250 low - 3500 high 5 mins each test - Chuck Sheave with AOGCC waived witness of BOP test - All test of BOP's and related equipment witnessed by WSL 14:00 - 15:30 1.50 BOPSUF P DECOMP Rig up lubricator - Screw into hanger - Pull TWC - Rig down lubricator 15:30 - 16:00 0.50 PULL P DECOMP Rig up to screw into hanger - Back out lock down screws - Pull hanger to rig floor PU - PUW 120 Block weight 50K 16:00 - 17:00 1.00 PULL P DECOMP CBU - 4.5 bpm @ 1770 psi 17:00 - 18:00 1.00 PULL P DECOMP Lay down landing joint - Blow down Top drive - Move stands on rig floor to make pocket to stand back 2 7/8" tubing 18:00 - 19:30 1.50 PULL P DECOMP PJSM - Rig up spooling sheve - Tubing tongs and handling equipment - Lay down hanger 19:30 - 23:30 4.00 PULL DECaMP POH with 2 7/8" Tubing - Stand back in derrick - From 9743' to 3021' (Total out 70 stands) 23:30 - 00:00 0.50 PULL P DECOMP Change out Centrlift spool 3/25/2005 00:00 - 00:30 0.50 PULL P DECOMP Can't change out Centrilift spool 00:30 - 03:00 2.50 PULL P DECOMP Can't POH standing back tubing - From 3021' to 62' Printed: 3/28/2005 8:04:05 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 3/19/2005 Rig Release: Rig Number: Spud Date: 12/21/1996 End: Date. From;'Tb Hours TaSk Cöde NPT·· 3/25/2005 03:00 - 05:30 2.50 PULL P DECOMP DesGriptiÒrï ofOpera:tiön$ 05:30 - 06:00 0.50 RUNCOMP RUNCMP 06:00 - 13:00 7.00 RUNCOMP RUNCMP 13:00 - 13:30 0.50 RUNCOMP RUNCMP 13:30 - 14:30 1.00 RUNCOMP RUNCMP 14:30 - 15:30 1.00 RUNCOrvf> RUNCMP 15:30 - 16:00 0.50 RUNCOMP RUNCMP 16:00 - 19:00 3.00 RUNCOMP RUNCMP 19:00 - 19:30 0.50 RUNCOMP RUNCMP 19:30 - 20:00 0.50 RUNCOMP RUNCMP 20:00 - 23:30 3.50 RUNCOMP RUNCMP 23:30 - 00:00 0.50 RUNCOMP RUNCMP 3/26/2005 00:00 - 01 :00 1.00 RUNCOM RUNCMP 01 :00 - 06:30 5.50 RUNCOM RUNCMP 06:30 - 09:00 2.50 RUNCOM RUNCMP 09:00 - 14:30 5.50 RUNCOM RUNCMP 14:30 - 15:00 0.50 RUNCOM RUNCMP 15:00 - 18:00 3.00 RUNCOM RUNCMP 18:00 - 20:30 2.50 RUNCOM RUNCMP 20:30 - 00:00 3.50 RUNCOM RUNCMP 3/27/2005 00:00 - 08:30 8.50 RUNCOtvP RUNCMP 08:30 - 12:00 3.50 RUNCOtvP RUNCMP 12:00 - 14:00 2.00 RUNCOtvP RUNCMP 14:00 - 14:30 0.50 RUNCOtvP RUNCMP 14:30 - 15:00 0.50 RUNCOtvP RUNCMP Disconnect ESP cable from motor - Lay down ESP cable sheave - Recovered 160 LaSalla clamps - 2 Flat Guards - 4 Protectolizers - Disconnect Discharge head from pump - Lay down ESP Pump - Tandem seal Section - Motor - 3' up on Pup above discharge head plugged with sand also pump packed off with sand Clear floor - Install wear ring - Make up 2 7/8" mule shoe RIH with mule shoe to 9502' Change out 2 7/8" handling tools - to 4" handling tools RIH from 9502' to 9830' - Tag bridge Pump 2 Hi-vis sweeps surface to surface Attempt to wash thru bridge @ 9830' Stage pump rate up to 330 GPM @ 3380 psi - Set down 15K attempt to wash thru bridge - No success Rotate @ 40 rpm - TO 2K - Rotate thru bridge @ 9830 - WOS 2K - 3K - 40 RPM - TO 2K - Wash from 9830 to 9877' - Lost complete returns - Continue wash from 9877' to 9905' W /0 returns - Pump and spot Hi-Vis sweep - Pump 28 bbls across top of hole with hole fill pump - No Returns POH from 9905' to 9480' - Stand back 4" DP in derrick Change out 4" Handling tools for 27/8" handling tools - Rig up tubing tongs - Shoot fluid level - Fluid level @ 2475' - PJSM tripping 2 7/8" Tubing POH with 2 7/8" tubing standing back in mast - Shoot fluid levels and fill with 3 bbls every 5 stands - (50 stands 2 7/8" tbg out) Fluid level 2805' Cut drlg line - Rig service Cut Drlg line - Rig service - Top drive service - Fluid level 3035' PJSM on laying down 2 7/8" tubing - Lay down 2 7/8" tubing - Shoot fluid level every 30 joints laid down - Fill with 3 bbls every 15 joints Run 50 stands 2 7/8" tubing in hole PJSM on laying down 27/8" tubing - Lay down 2 7/8" tubing - Shoot fluid level every 30 joints laid down - Fill with 3 bbls every 15 joints Pull wear ring - Fluid level 2915' Pick up jet pump and motor assembly - Make up - Fill with oil - as per centrilift Tect - Install sheave for ESP cable in derrick - Make up ESP cable - Test cable continuity - Install Protectolizers and Armsterguards - Strap and drift 2 7/8" tubing in pipe shed Finish drifting - Strapping 2 7/8" tubing PJSM - Run 2 7/8" L-80 - EUE 8 rd 6.5# tubing - Test cable continuity - Pump tubing volume every 2000' ran PJSM - Run 2 7/8" L-80 - EUE 8 rd 6.5# tubing - Test cable continuity & Pump tubing volume every 2000' ran Splice ESP cable to 2nd spool Can't RIH with ESP pump- Test ESP cable continuity - Pump 10 bbls down tubing - Good test Change out 2 7/8" handling tools to 4" - Make up landing joint - Tubing hanger Printed: 3/28/2005 8:04:05 AM ) ') >BPEXPLORATION Qpérati'Ql1s<.$urrarn¡iryR~pbrt· · . . . ""0 ... .. .""0 . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 3/19/2005 Rig Release: Rig Number: Spud Date: 12/21/1996 End: Date Frörtl~To Hours Task Code NPT Phasè Description of([)përations 3/27/2005 15:00 - 17:00 2.00 RUNCOMP RUNCMP 17:00 - 17:30 0.50 RUNCOMP RUNCMP 17:30 - 18:00 0.50 RUNCOMP RUNCMP 18:00 - 20:00 2.00 RUNCOMP RUNCMP 20:00 - 21 :30 1.50 RUNCOMP RUNCMP 21 :30 - 22:00 0.50 RUNCOMP RUNCMP 22:00 - 23:00 1.00 RUNCOMP RUNCMP Make up ESP hanger penetrator - Make up ESP connection for penetrator - Test ESP penetrator continuity - Good test Land tubing on hanger - RILDS - PUW 120 - SOW 88 B~ck out landing joint - Break same down - Install TWC with dry rod Nipple down BOP's Nipple up FMC 2 1/16" X 7" adapter - 2 1 /16" tree - Test hanger seal area to 5K for 10 mins - Test tree 5K for 30 mins - Good test Check annulus for pressure - Dry rod TWC out - Install BPV - Install all gauges - valve handles - Secure well - Test final continuity test on ESP cable - Good test - (release rig @ 23:00 hrs) Printed: 3/28/2005 8:04:05 AM ) ) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: j¡m, regg@admín.state.ak.us aogcç 'piudhoe..,bay@adm¡n.state.ak.us b9!J..neckenst~;n@admín .$tate .ak. us Rig No.: 14 DATE: 3/24/2005 Rig Phone: 670-3270 Rig Fax: 670-3269 Op. Phone: 670-3268 Op. Fax: 670-3269 1 /28/04 Contractor: Doyon Rig Rep.: Egholm/Marmon Operator: BP Rep.: Vaughn / Brown Field/Unit & Well No.: MP K-06 Location: Section: Operation: Drlg: Test: Initial: XXXXXX Test Pressure: Rams: 250/3500 MISC. INSPECTIONS: Test Result Location Gen.: P Housekeeping: P PTD On Location NA Standing Order Posted P BOP STACK: Quantity 1 1 1 1 1 2 1 o Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve MUD SYSTEM: Visual Test Trip Tank P Pit Level Indicators P Flow Indicator P Meth Gas Detector P H2S Gas Detector P 3 Well Sign Dr!. Rig Hazard Sec. Size 13 5/8 3 1/2 x 6 2-7/8 x 5 Blind 3 1/8 3 1/8 3 1/8 Alarm Test P P P P P PTD # 196-191 Township: 12N Workover: XXXX Weekly: Annular: 250/2500 TEST DATA Test Result P P P Test Result P P P P P P P NA Meridian: Range: Explor. : Other: Valves: 250/3500 UM 11E FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P I nside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 14 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1900 P 200 psi Attained 30 sec P Full Pressure Attained 2 min 55 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4 ~ 2300 Test Results Number of Failures: 1 Test Time: .tl Hours Components tested Repair or replacement of equipment will be made within days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: j¡m regg@admín.state.ak.us Remarks: Lower manuallBOP on topdrive failed. ChanQed out and retested Qood. 24 HOUR NOTICE GIVEN YES X NO Date Test start 03/22/05 0300hrs Time Finish .- .,. M'AR' o. 'I )on~) .;,::. '·.··b.!i'..q"'EI .:, ¿. ,.}: '- 'w'.., I' ~t-....~! ~ ~ '¥ -' .' .. BOP Test (for rigs) BFL 1/28/04 Waived By Chuck Sheve 4:00 PM Witness E. Vaughn / M Egholm 1400hrs BOP Doyon 14 3-24-05-1.xls STATE OF ALASKA ALASKA jL AND GAS CONSERVATION CC. .v1ISSION REPORT OF SU N DRY WELL OPERA TI~rCE lYE 0 0 Stimulate S Other . . 0 0 Waiver A\asKa Oil & ~ktQ~~S' 0 Re-Enter Suspended Well Anchorage 1. Operations Performed: 0 Abandon 0 Alter Casing 0 Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. ress: P.O. Box 196612, Anchorage, Alaska 99519-6612 7. KB Elevation (ft): KBE = 61.50' 8. Property Designation: ADL 028232 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 74' Surface 3716' Intermediate Production 10162' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): ~ ~ II Repair Well 0 Plug Perforations II Pull Tubing 0 Perforate New Pool 0 Operation Shutdown 0 Perforate 4. Current Well Class: II Development 0 Exploratory 0 Stratigraphic 0 Service 196-191 6. API Number: 50-029-22725-00-00 9. Well Name and Number: MPK-O6 10. Field 1 Pool(s): Milne Point Unit 1 Kuparuk River Sands 10195 7305 9925 7107 feet feet Plugs (measured) 9925' feet Junk (measured) NIA feet Size MD TVD Burst Collapse 20" 112' 112' 1490 470 9-5/8" 3751' 3570' 5750 3090 7" 10191' 7302' 7240 5410 9836' - 9947' 7043' - 7123' 2-7/8",6.5#, L-80 9749' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): None 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. ~!I~','!k'~~ l-;"- , J ~~J Oil-Bbl Prior to well operation: 89 Subsequent to operation: 130 14. Attachments: 0 Copies of Logs and Surveys run II Daily Report of Well Operations II Well Schematic Diagram Re resentative Dail Avera e Production or In'ection Data Gas-Met Water-Bbl Cas in Pressure 13 872 270 43 1004 40 15. Well Class after proposed work: 0 Exploratory II Development 0 Service 16. Well Status after proposed work: II Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL est 0 my now ge. Sundry Number or N/A if C.O. Exempt: Tubin Pressure 216 212 Printed Name Sondra Stewman Title Technical Assistant - .-- . -1 I Prepared By Name/Numb9~ Date(:>q :2.Z.-1.J1' Sondra Stewman, 564-4750 Submit Original Only TREE: 2-9/16" - 5M Cooper r-' WELLHEAD: 7-1/16" 5M FMC SA ACTUATOR: Baker I Tub hgr. 3" LH Acme top. 2-9/16" CIW BPV. Conductor I 112' KOP @ 400 ' Max Hole Angle: 60.4' @ 7046.72' MD Angle thru perfs = 43' 9 5/8" 40# L-80 Surface Casing 1375°' MOl ~ 27/8" 6.5# EUE 8RD, L- 80 TUBING DRIFT ID: 2.441" CAPACITY: 0.00579 7" 26 ppf, L-BO, Btrc. prod. casing (drift 10 = 6.151", cap. = 0.0383 bpf) Stimulation Summary none Perforation Summary Ref log: GR 1 CCL 1/12/97 Size SPF Interval (TVD) C -Sands 4.5'" 5 9,836'-9,856' 7,043'-7,057' 4.5" 5 9,852'-9,912' 7,055'-7,098' B -Sands 4.5" 5 9,940'-9,947' 7,124'-7,126' 'Shot 6/24/01 MPU K- 6 ~ Ori~ Elev. = 61.5' (N27E) Ori, '- Elev. = 27.9' (N27E) RKB BF. = 20.21 (4-ES ) Cameo 2-7/8" x 1" I sidepocket KBMM GLM 138' Camco 2-7/8" x 1" sidepoeket KBMM GLM I I 9,654' 2-7/8" XN nipple (10 2.205") 9,543' I I 9,697' I Pump, 151 Stg. GC1700, I Model - GPMTAR 1:1 Intake 9,715' MO = 6,957' TVO Tandem Seal Section Model GSB3 DB UTILT IL H6 (PFS) HSN 9,716' Motor, 152HP, 2325 V, 40 amp, Model KMH rerated from 130 HP, 2145 V, 35 A KME-1 9,730' PHO w/6 fin Centralizer I 9,743' 7" HES (CIBP) @ 9925' ELMO 7" float collar (PBTO) 7" 26#1ft L-80 BTRS 110,189' Mol 110,191' Mol DATE REV. BY COMMENTS MOO ESP Completion 4-ES MOO Set bridge plug 1 ESP RWO 4-ES Reperf 1 ESP RWO 4-ES JRC RWO 4_ES MILNE POINT UNIT WELL K-6 API NO: 50-029-22725 . . Page 1 of 2 BP EXPLORATION Operations Summary Report Legal Well Name: MPK-06 Common Well Name: MPK-06 Event Name: WORKOVER Start: 9/2/2004 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/5/2004 Rig Name: NABORS 4ES Rig Number: 4ES · I . , : ¡ Date I From - To f Hours ¡Task ¡ Code i NPT , Phase ,^""!",~,_""",,_,_,u'''_+-___I''h_,,,u___I'_''''''+'''h'U'...1.......... 9/212004 : 06:00 - 07:00 ¡ 1.00! MOB ¡ Pi! PRE :07:00-08:00 t 1.00¡MOB !p ¡PRE (08:00 -14:00 I 6.001 MOB liP ;PRE ¡ 14:00 - 19:00 ! 5.00 ì MOB . P ! PRE .. i l t I ; i ! ¡ ¡ i '¡ . i 19:00 - 22:00 I 3.00 ¡ MOB i P !" PRE Iii ¡ I I I ! J I' ' I ¡ i ! 22:00 - 00:00 I 2.00! KILL i P · ! I ! I j ¡OO:OO - 01:00 I 1.001 KILL · i! ¡ , ¡ !01:00 - 04:00 ì ! 04:00 - 08:00 t 1 108:00 - 12:00 ¡ t J 112:00 - 12:30 ¡ 1 i 12:30 - 13:30 I ! I , I 113:30-14:30 I I 114:30 - 21:00 I I ¡ 121:00 - 22:00 I ! ~ ~ f i I 122:00 - 23:00 ! I i I ' : 23:00 - 00:00 ! ¡ ¡ ! 00:00 - 03:00 ¡ 103:00 - 05:00 I ¡ 1 ¡ ! i ¡ i f i ! ¡ ! 105:00 - 13:30 i · ! I I I I 113:30 - 15:00 í ¡ ¡ ¡ I 9/312004 ¡ !p I DECOMP I i i I DECOMP , ¡ DECOMP I DECOMP I ¡DECOMP 9/4/2004 1 . 3.001 WHSUR!P 4.00t BOPSURP I f 4.00 I BOPSU~ P ¡ i i ¡ 0.501 BOPSURP ~ i ¡ i 1.00¡WHSURiP , I 1.00PULL IP 6.50 ¡ PULL I P Ip I ¡ ! i Ip !p i , I Ip ¡p I ¡ DECOMP I ¡ DECOMP í , ¡ DECOMP ¡ I I DECOMP I DECOMP I I DECOMP ! DECaMP ! i ¡ . I i J ! DECOMP ì ¡ ! I RUNCMP I DECOMP ; ¡ I DECOMP , 1.001 EVAL i i i ! i 1.00 i CLEAN ! i i 1.00 ¡ CLEAN i i 3.00 ¡ CLEAN 2.001 CLEAN I ¡ i i 8.50 í CLEAN I p i ¡ ! i I i i I 1.50i RUNCO~ i , Spud Date: 12/21/1996 End: 9/5/2004 Description of Operations ..~_...._.".-.....--"... ._._.·__._,__......._"""~_~h~_¥...~.'·h~_~.~Y~.....'H'~'V'~,..U.~.._.~ PJSM. Scope down & layover derrick. PJSM. Prep rig components & camp for rig move to MPK-06. Move rig off MPE Pad, road tailed in a plywooded section near the mid-point between MPU main road & MPU K-pad. Begin exception rig move. Finish excep1ion rig move to MPK-06. PJSM. Assemble rig components on well. Raise & scope up derrick. Rig accepted @ 19:00 hrs, 09/02/2004. PJSM. Rig up Hnes to tiger tank. install secondary, (HCR), valve on inner annulus. Rig up lines to tree. Test lines to 3500 psi, OK. Pick up lubricator & pull BPV. Monitor well. O/A = 260 psi. PJSM. Bleed down well from SITP = 0 psi, SICP = 230 psi; 0 psi both sides in 5 minutes. Circulate 120 F S/W: TV = 56 Bbls; Bullhead Vol = 13 Bbls; AV = 290 Bbls. SI, observe pressures for 20 mins: TP = 0 psi, CP = 0 psi. Clean returns aiter 360 Bbls full circ. SI, observe pressures for 20 mins: TP = 0 psi, CP = 0 psi. Restart circ and calculate fluid loss: 42 Bbls fluid lost during circulation. Install ESP sheave drain and elephant trunk. P/U TWC and instal! in Hanger. NID tree. N/U BOPE. Change Blind/Shear Rams (installed our orginal re-build rams). Test BOPE to BP/AOGCC requiremen1s at 250/3500 psi. State's right to witness test waived by J. Spaulding. Rig down Test Equipment. Drain BOP Stack. Blow down Unes. Pick-up Lubricator and Extention. Pull TWC. Lay down same. Well on Vacuum. Pick-up Landing Joint. BOLDS. Pull Tubing Hanger to Floor (70 K) with no problems. Lay down same. POOH with 2 fiS" 6.5 Iblft, EUE Srd, L-BO Tbg and ESP Completion. While breaking out ESP equipment found -30' ollormation sand and scale packed inside pup joints above 1he pump. Conversed wi Milne Point and Engineer and decided to make cleanout run wi?" scraper and 2-7/8" mule shoe. Clear and clean rig floor. Rig up to run 2-7/8". Wait on BOT scraper and XO's. MIU BHA #1: 2-7/8" mule shoe, 4 jts 2-7/S", EUE Srd, 7" BOT esg scraper. Begin to RIH on 2-7/8" tubing from derrick. RIH BHA #1 on 2-7/8" tubing from derrick. P/U 3-112" DP from pipe shed and RI w/12 jts plus 6' on jt #13 to hard tag @ 9869'. Pull up and R/U to circulate and mix HiVis sweep. Break circulation, change to rev cire, but not enough pipe wt to drop through bag. Re-align and cire long way, drop Ihru "hard" spot and quickly work down to 9894', but formation is taking fluid. Pump 40 BbI HiVis sweep. TOH. Lay down 13 Jt of 31/2" DrBI Pipe. Lay down 81 Jt of:2 7/8" Tbg (scale build-up on inside...MPU wanted to replace). Continue TOH with 2 7/S" Tbg...s1anding back in Derrick. (Tally pipe in Derrick). Load and tally 82 jt 2 7/8" 6.51b1ft EUE Srd L-BO Class B Tbg in Primed: 713112007 9:32:49 AM . . BP EXPLORATION Operations Summary Report Page 2 of 2 Legal Well Name: MPK-06 Common Well Name: MPK-Û6 Event Name: WORKOVER Start: 9/212004 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/5/2004 Rig Name: NABORS 4ES Rig Number: 4ES Date ¡ From - To i Hours I Task ! Code I NPT I Phase ¡ Description of Operations .__n._._nnn._.........i.. ... _m. _...... ..._....__..l........_..__.j ..___.........._.i..''..._...''..._-!_..................L...__.___...''.''...._1................. _u"" .".........................._..."n.............. .... .... ... ........................_.........._.............._.........,,_.................. 9/412004 :13:30-15:00! 1.50RUNCO,Jp ¡ IRUNCMP P¡peShed. Lube rig. Clear and clean Floor. : 15:00.. 18:00 I 3.001 RUNCOrr ]1 !RUNCMP PJSM with all. Pick-up and service ESP Assembly. Pull motor : ¡ i I I ¡lead extension and cable over sheave. Test and connect MLE . ¡ ¡ ¡ 1 ¡to ESP. ¡ 18:00 - 20:00 ¡ 2.00; RUNCO~ I I RUNCMP ¡ RIH new ESP completion on 2-7/8" tbg from derrick. Meg ¡ ¡ !I I I I ¡cable every 2000' & pump (10) bbls seawater through pump. ! 20:00 - 23:30 ; 3.50 ¡ RUNCO~ RUNCMP ¡ Make cable splice to 2nd reel. 123:30 - 00:00 ¡ 0.501 RUNCOMP I RUNCMP ¡Cont RIH new ESP on 2-7/8" tbg from derrick.. 100:00.. 01:30 ! 1.501 RUNCONP I RUNCMP !Cont RIH new ESP on 2-7/8" tbg from derrick_ Test cable. 101:30 - 03:30 ! 2.001 RUNCO~ I I RUNCMP ¡ Cont RIH new ESP on 82 jts of 2-7/8" tbg from pipe shed. ; ¡! I I : Rabbit all tbg from shed. ! 03:30 - 04:00 I 0.50 I RUNCOrr I 'I RUNCMP ! PIU landing j1 and M/U to tubing hanger and tubing. PIU WI = t ~! i : f 75K; SlO wt = 45K. ¡ 04:00 - 06:30 ¡ 2.50! RUNCO¥? ! ¡ RUNCMP ! Meg ESP cable. Make field connection & test, OK. Utilized 5 i !: ¡ j i ¡Protectolizers,3 Flat Guards, & 158 La Salle Clamps. !06:3O-07:00 ¡ O.SOBOPSURP !RUNCMP !Landtbghanger&RILDS. ! 07:00 - 07:30 i 0.501 BOPSUA P ! RUNCMP ! Set two way check & test @ 1000 psi, OK. j07:30 - 08:30 ¡ 1.001 BOPSUAP !RUNCMP iNfO BOPE, test spool, and adaptor flange. f08:3O - 11:00 ¡ 2.50! WHSUR! P [RUNCMP fNIU & test adapter flange & tree @ 5000 psi, OK. Secure well. , i j ¡ . ¡release rig @ 1100 hrs. 9/512004. i 11 :00 - 12:30 ¡ 1.50: RIGD t P ! POST ! Scope and !ower derrick. ¡ 12:30 - 14:30 I 2.oo! DEMOB ¡ P 1 POST I Move pits and Pipe Shed off location and on to MPI-QS. ! 14:30 - 16:00 I 1.501 DEMOB i P ¡POST [Move sub off well and clean MPK--06 pad and area. ! 16:00 - 20:00 I 4.00 i DEMOB ! P ¡ POST I Move rig sub and camp to MPI-08. ¡ i J , f 9/512004 Spud Date: 12/21/1996 End: 9/5/2004 Printed: 7/3112007 9:32:49 AM ~'""~' .... ~ STATE OF ALASKA "' ALASKA ,,.,,L AND GAS CONSERVATION COMM,,.,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: If;il Pull Tubing 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska I-1 Operation Shutdown n stimulate n Plugging !~! Perforate !"1 Alter Casing ~ Repair Well IRI Other 5.-'ryl~-e' ~f-~elli ..................... I~ Development I-I Exploratory r-I Stratigraphic 99519-6612 !"1 Service 4. Location of well at surface 3773' NSL, 2031' WEL, SEC. 03, T12N, R11E, UM At top of productive interval 3542' NSL, 144' EWL, SEC. 34, T13N, R11E, UM At effective depth 3591' NSL, 171' EWL, SEC. 34, T13N, R11E, UM At total depth 3753' NSL, 260' EWL, SEC. 34, T13N, R11E, UM 12. Present well condition summary Total depth: measured true vertical 10195 feet Plugs (measured) 7304 feet Effective depth: measured true vertical 9925 feet Junk (measured) 7107 feet Casing Structural Conductor Surface Intermediate Production Liner Change Out ESP 6. Datum Elevation (DF or KB) KBE = 61.5' 7. Unit or Property Name Milne Point Unit 8~~ Well N"d'mber ............... MPK-06 9. Permit Number / Approval No. 196-191 10. APl Number 50-029-22725-00 11. Field and Pool Milne Point Unit/Kuparuk River Sands 7" HES Bridge Plug at 9925' (12/00) Length Size Cemented 250 sx Arcticset I (Approx.) 1105 sx PF 'E', 700 sx Class 'G' 74' 20" 3716' 9-5/8" 10162' 7" 447 sx Class 'G' MD TVD 112' 112' 3751' 3570' 10191' 7302' Perforation depth: measured 9852'- 9912' Below Bridge Plug: 9940'- 9947' true vertical 7055'- 7098' Below Bridge Plug: 7118'- 7123' Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80, 8rd EUE to 9738' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED JUL 1 8 ZOO1 Alaska Oil & Gas Cons. Comrnissiorl Anchorage 14. OiI-Bbl Prior to well operation: Subsequent to operation' 15. Attachments Representative Daily Average Production or Injection ,Data Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure i6. ~iai~s'0f'W~II Cl'aS~ific-ations as: .......................................... r-i copies of Logs and Surveys run !~! Daily Report of Well Operations I~ Oil r'-I Gas r-I Suspended Service 17. i hereby certify that the fer. egoing is true and correct to ~he'best Of mC knoWledge ........................................... ....Signed ..... So~~' Title ..... T. ec~nical...Assistant Date Form 10-404 Rev. 06/15/88 ' '" ............ Sub-mit in D-uplibate~ j~ e Page 1 of 1 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPK-06 MPK-06 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES ..1 I 612:: - ~:r~Om ~T~ H~~r:otZk ~o~e I N~T 6/21/2001 00:00 - 08:00 8.001 MOB P 4.00 I KILL P 2.50 KILL P 2.00 WHSUR P 2.00 BOPSUF P 2.00 BOPSUF P Phase ; .-.---.-.. PRE PRE DECOMP DECOMP DECOMP DECOMP DECOMP 08:00 - 12:00 12:00 - 14:30 14:30 - 16:30 16:30 - 18:30 18:30 - 20:30 20:30 - 00:00 3.50 PULL P DECOMP 6/22/2001 00:00 - 06:00 6.00 PULL P DECOMP 06:00 - 10:30 4.50 CLEAN C DPRB DECOMP 10:30 - 16:30 6.00 CLEAN C DECOMP 16:30 - 20:30 4.00 CLEAN C DECOMP 6/23/2001 20:30 - 23:00 23:00 - 00:00 00:00 - 08:30 08:30 - 13:00 13:00 - 21 :00 2.50 CLEAN C 1.00 CLEAN C 8.50 CLEAN C 4.50 RUNCOMC 8.00 PERF C WAIT DECOMP DECOMP DECOMP COMP COMP 6/24/2001 21 :00 - 00:00 3.00 RUNCmC COMP 00:00 - 01 :00 1.00 PERF C COMP 01 :00 - 07:00 6.00 PERF C COMP 07:00 - 12:30 5.50 CLEAN C COMP 12:30 - 14:00 1 .50 CLEAN C COMP 14:00 - 18:00 4.00 CLEAN C COMP 18:00 - 23:00 5.00 PERF C COMP 23:00 - 00:00 1.00 RUNCOr,p COMP 00:00 - 12:30 12.50 RUNCor If> COMP 12:30 - 14:30 2.00 BOPSUF P COMP 14:30 - 16:00 1.50 WHSUR P COMP 16:00 - 17:00 1.00 WHSUR P COMP 17:00 - 21 :00 4.00 CASE P COMP 6/25/2001 \q<o - \<; \ Start: 6/21/2001 Rig Release: 6/25/2001 Rig Number: 4ES Spud Date: 12/21/1996 End: 6/25/2001 Description of Operations --.-.. .- .--.--..-....-----. ... ----..- ----. MOVE RIG FROM MPF-57 TO MPK-06 MOVE IN RIG UP & RAISE DERRICK LEVEL & SAFE OUT EQUIPMENT. RIG ACCEPTED @ 0800 HRS. 6/21/2001 RIG TIGER TANK & LINES TO TREE TAKE ON SEAWATER & TEST LINES & RIG LUBRICATOR & PULL BPV. CIRC INFLLUX FROM WELL BORE WITH SEA WATER. SET & TEST TWC & NIPPLE DOWN TREE. NIPPLE UP BOP BODY TEST BOP TO 250 LOW & 3500 HIGH TEST WAIVED BY CHUCK SHEVE WITH AOGC. PULL ESP COMPLETION POOH WITH ESP COMPLETION & CLN/RIG FLOOR RIG HES SLlCKLlNE & RIH & TAG SAND @ 9821' (WLM) WITH BAILER & POOH & RECOVER FORMATION SAND. RIG DOWN HES RIH WITH 2-7/8" MULE SHOE & TAG @ 9806' & REVERSE SAND OUT OF WELL BORE TO 9892' 4ES KB TAGGED HARD ATTEMPT TO WASH THROUGH LONG WAY NO FORWARD PROGRESS .REVERSE WELL BORE CLN-OF SAND. POOH WITH TBG. STRING FOUND HOLE IN TBG. AT APP. 5735' & UPON FARTHER EVALUATION OF TBG. IT WAS FOUND TO BE VERY CORROSIVE DECISION TO LAY DN STRING & REPLACE WAS MADE. RIH WITH TBG. FROM DERRICK. LAY DN 2-7/8" TBG. CONTINUE TO LAY DOWN TBG. (JUNKED) LOAD & DRIFT & STRAP 2-7/8" TBG. STRING. DECISION TO PERF. WELL DUE TO BEING UNABLE TO PUMP INTO FORMATION BY APPLYING 1500 PSI. OF SURFACE PSI WITH A FULL COLUMN OF 8.5 PPG. FLUID & THIS ALL EQUALS TO A 12.58 PPG. GRADIENT AND HAD NO BLEED OFF TO FORMATION. . AND RECORDS SHOW THAT FORMATION SHOULD BE EQUAL TO 7.1 PPG. PICK UP 2-7/8" TBG. 93 JTS. POOH WITH TBG. RIG SWS & RIH & LOG INTO POSITION WITH CCL & UNABLE TO GET PAST 9860' POOH & RIG DOWN SWS. RIH WITH TBG. FROM DERRICK & SHED TO 9901' TAG. CIRC & WORK PIPE UNABLE TO MAKE ANY FORWARD PROGRESS. WELL BORE CLN @ 9901' TOH WITH TBG. FOR SWS RIG SWS & RIH WITH GUN #1 & GET ON DEPTH & PERF WELL 9863' TO 9883' POOH & RIG DOWN SWS. RIH WITH ESP COMPo RIH WITH COMPLETION INSTALL HANGER & MAKE SPLICE &RILDS & SET TWC & TEST SAME. NIPPLE DN BOP NIPPLE UP TREE & TEST SAME TO 5000 PSI; RIG LUBRICATOR & PULL TWC RIG UP TO FREEZE PROTECT WELL & FREEZE PROTECT WITH HB&R & SET BPV & SECURE TREE AREA. Printed: 3/7/2006 1 :37:28 PM STATE OF ALASKA ' '- ALASKA OIL AND GAS CONSERVATION COMM,,... _ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 61.5' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Milne Point Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 3773' NSL, 2031' WEL, SEC. 03, T12N, R11 E, UM MPK-06 At top of productive interval 9. Permit Number / Approval No. 196-191 3542' NSL, 144' EWL, SEC. 34, T13N, R11E, UM 10. APl Number At effective depth 50-029-22725-00 3591' NSL, 171' EWL, SEC. 34, T13N, R11E, UM 11. Field and Pool At total depth Milne Point Unit / Kuparuk River 3753' NSL, 260' EWL, SEC. 34, T13N, R11E, UM Sands 12. Present well condition summary Total depth: measured , 10195 feet Plugs (measured) 7" HES Bridge Plug at 9925' (12/00) true vertical 7304 feet Effective depth: measured 9925 feet Junk (measured) true vertical 7107 feet Casing Length Size Cemented MD TVD Structural Conductor 74' 20" 250 sx Arcticset I (Approx.) 112' 112' Surface 3716' 9-5/8" 1105 sx PF 'E', 700 sx Class 'G' 3751' 3570' Intermediate Production 10162' 7" 447 sx Class 'G' 10191' 7302' Liner - Perforation depth: measured 9852' 9912' Below Bridge Plug: 9940' - 9947' true vertical 7055' - 7098' Below Bridge Plug: 7118'- 7123' t-- Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80, 8rd EUE to 9738' ,41aska Oil ~ Packers and SSSV (type and measured depth) None '4'nch°m~r-'. 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is t~rect to the best of my knowledge Signed Terrie Hubbie~/"i,~,/1/~,(~~ Title Technical Assistant Date 0 Prepared By Name/Number: Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate-, : ::: iii : BP:ExPLORATION FEB 0 7 ~001 Page lof2 ':: ~ ::: ~:: ~ :~:~ operations Summary Repor~ask~ o~- cas c~,-,~. Commission Legal Well Name: MPK-06 Common Well Name: MPK-06 Spud Date: 12/21/1996 Event Name: REPAIR Start: 11/30/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: i: :Dat~ i ~'Fr°m..T°[:Hours Task: i:(~dbe,IPhase :i : of Operations ~ l~ ] ~ : ! Description 12/1/2000 06:00 - 18:00 12.00 MOB PRE RIG DOWN & MOVE FROM F-73 TO K-6 WELL. RIG UP. 18:00 - 20:00 2.00 MOB PRE ACCEPTED R G @ 1800 HRS. 12-1-00. RAISE & SCOPE DERRICK. SPOT & BERM TIGER TANK. HOOK UP LINES. 20:00 - 21:00 1.00 MOB PRE R/U HCR & LINES TO TREE. 21:00 - 21:30 0.50 WHSUR DECOMP PRESSURE TEST ALL LINES TO 2500 PSI. 21:30 - 22:30 1.00 WHSUR DECOMP M/U LUBRICATOR & PULL BPV. 22:30 - 23:30 1.00 KILL DECOMP TAKE ON KILL FLUIDS. 23:30 - 00:00 0.50 KILL DECOMP SITP 0 PSI, SICP 200 PSI. BEGIN KILL ePS. PUMP 8.4 PPG SEAWATER @ 3 BPM, 1000 PSI. 12/2/2000 00:00 - 03:30 3.50 KILL DECOMP KILL WELL PUMP 3 BPM @ 1150 PSI. RECOVERED 155 BLLS CRUDE. 03:30 - 04:00 0.50 KILL DECOMP SI WELL. ANN PRESSURE 150 PSI, BLEED OFF PRESSURE. WELL DEAD. MONITOR WELL. 04:00 - 04:30 0.50 WHSUR DECOMP SET TWC & BLOW DOWN LINES. 04:30 - 06:00 1.50 WHSUR DECOMP N/D X-MAS TREE. 06:00 - 08:30 2.50 BOPSUF DECOMP N/U BOPE. 08:30 - 09:30 1.00 BOPSUF DECOMP PRESSURE TEST BOPE. LP 250 PSI, HP 3500 PSI. 09:30 - 10:30 1.00 WHSUR DECOMP M/U LUBRICATOR & PULL TWC VALVE. 10:30 - 12:30 2.00 PULL DECOMP M/U LANDING JT & PULL HANGER PULL TO 100K THEN SLACKED OFF TO 75K. L/D HANGER & TEST ESP. 12:30 - 13:00 0.50 PULL DECOMP PUMP 20 BBLS DOWN TBG & TIE ESP CABLE TO REEL. 13:00 - 19:30 6.50 PULL DECOMP PULL 2 7/8" COMPLETION STRING. 19:30 - 21:30 2.00 PULL DECOMP L/D ESP ASSY. ESP BADLY CORRODED (ACID ?) & WASHED. 21:30 - 22:00 0.50 PULL DECOMP RIH HOLE 4 STANDS TBG & L/D BAD JTS. REPLACE. SLM & STAND BACK STANDS. 22:00 - 22:30 0.50 PULL DECOMP CLEAR RIG FLOOR. HOLD SAFETY MTG. 22:30 - 00:00 1.50 REST DECOMP R/U SCHLUMBERGER TO SET CIBP. 12/3/2000 00:00 - 07:00 7.00 REST DECOMP FINISH RIGGING UP LOGGERS. RIH W/GAUGE RING & JUNK BASKET. COULD NOT GET DEEPER THAN 9900' W/5.9" RING.RUN 5.71" GAUGE RING & WENT TO NO DEEPER THAN 9902'. POOH. R/D LOGGERS. 07:00 - 12:00 5.00 REST DECOMP i P-JU TO RIH W/DP. LOAD DP TALLY SAME. 12:00-22:00 10.00 REST DECOMP PIU&RIHW/3112"DP&6"MILL&6*41314"DCS. 22:00 - 00:00 2.00 REST DECOMP TAG UP 9900' HARD @ 9930'. MILL& WORK STRING UP & DOWN & CLEAN UP. 12/4/2000 00:00 - 04:30 4.50 CLEAN DECOMP POOH & STAND BACK DP. 04:30 - 05:00 0.50 CLEAN DECOMP CLEAR FLOOR. 05:00 - 12:00 7.00 CLEAN DECOMP R/U SLICKLINE EQUIP. RIH W/6" GAUGE RING & TAG UP @ 9932'. R/D SLICKLINE EQUIP. 12:00 - 14:30 2.50 REST DECOMP WAIT ON SCLUMBERGER. RIG UP WIRELINE EQUIP. DID NOT HAVE X-OVER FOR PACKOFF. 14:30 - 18:00 3.50 REST DECOMP WAIT ON SCLUMBERGER ( ADAPTER F/PACKOFF.) 18:00 - 21:30 3.50 REST DECOMP FINISH PJU. RIH & SET CIBP @ 9925'. R/D SCHLUMBERGER. 21:30 - 00:00 2.50 REST DECOMP RIH W/3 1/2" DP. 12/5/2000 00:00 - 01:00 1.00 REST DECOMP RIH W/3 1/2" DP. 01:00 - 02:30 1.50 REST DECOMP CUT & SLIP DRILLING LINE. 02:30 - 10:30 8.00 REST DECOMP POOH & L/D 3 1/2" DP AND 6 -4 3/4" DRILL COLLARS 10:30 - 11:30 1.00 CLEAN COMP CLEAR RIG FLOOR AND RIG UP TO RUN ESP 11:30 - 14:30 3.00 RUNCOIX COMP PICK UP AND SERVICE ESP. TEST ESP 14:30 - 20:30 6.00 RUNCOIt COMP RUN IN THE HOLE WITH 2 7/8" COMPLETION. NO READING ON PHD AT 3,700 ' PUMPED 20 BBLS AT I BPM AT 1800 PSI. RETEST ON PHD OK. 20:30 - 23:00 2.50 RUNCO~ COMP REEL TO REEL SPLICE@7450'. CIRCULATE DOWN TUBING 10 Printed: 12/20/2000 7:41:27 PM :: : :: :: ::: : :: ::: ,: : BP EXPLORATION Page 2 of 2 Legal Well Name: MPK-06 Common Well Name: MPK-06 Spud Date: 12/21/1996 Event Name: REPAIR Start: 11/30/2000 End' Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: Operations 12/5/2000 20:30 - 23:00 2.50 RUNCOI~I COMP SPM / 1850 PSI PUMPED 30 BBLS. 23:00 - 23:59 0.98 RUNCOIr~ COMP RIH W/ESPTO 9,738' Alaska Oil & Ga:~ (.'.one. Con'~r~lissio~ Anchorage Printed: 12/20/2000 7:41:27 PM ON OR BEFORE C..LORi~V~ILM.DOC PERMIT 96-191 96-191 96-191 96-191 96-191 96-191 96-191 96-191 96-191 96-191 AOGCC Individual Well Geological Materials Inventory DATA T DATA PLUS DGR/RES-MD DGR/CNP/SLD-MD 7627 7659 MULTI SHOT SRVY MWD SRVY ~?~PERRY ~00-1003S GR-CCL DEPTH ,.~00-10093 DGR/CNP/SLD-TVD ~3577-7304 D~/~Es-TW '~577-7304 ~765-10195 ~/'3765-10195 G~'~PERRY MPT/GRC/RES/CNP .~CHL~ GR/CCL 0-10205 0-10195. Page: 1 Date: 01/21/99 T / RUN RECVD D FINAL 02/21/97 FINAL 02/21/97 FINAL 03/26/97 FINAL 03/26/97 FINAL 03/26/97 FINAL 03/26/97 2,3 04/02/97 I 04/21/97 05/15/97 05/15/97 lO-4O7 ~--COMPLETZO~ DATE l//~{/ q ~ DAZLYWELL OPS R /~/~4//~/ TO ///37~ Are dry ditch samples required? yes ~And received? Was the well cored? yes g~:_Analysis & description received? Are well tests required? yes n~.Received? ~' Well is in compliance ~'O InTtial COMMENTS / ?/ / /~/ / yes.--~nO~ yes ~-z'xo .... 4/15/97 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10943 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape MPK-06 ,;_~.' ,-? (~.~ ,..~ ~ ¢.::~ 97127 GR/CCL (PDC) 970112 1 MPK-33 "~--. "7 (,~..~ ,c~ <'2~_, 971 26 GPJCCL DEPTH LOG 9701 29 1 · PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 0 F! I I--I--I IM G S ~: I~! ~./I ~- ~c: WELL LOG TRANSMITTAL To: State of Alaska April 2, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. ~ ~ Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPK-06 RE: AK-MM-60199 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS Tape with verification listing. API#: 50-029-22725-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company OFt I I_ll IM Oi S ~ lal~/I I~ ~= S WELL LOG TRANSMITTAL To: State of Alaska March 26, 1997 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPK-06, AK-MM-60199 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22725-00 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22725-00 2" x 5" MD Neutron and Density Logs: 50-029-22725-00 2" x 5" TVD Neutron and Density Logs: 50-029-22725-00 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10814 Company: Field: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) 2/21/97 Well Job # Log Description Date BL RF Sepia LIS Tape MPF-21 ULTRASONIC IMAGER 9701 04 1 1 M P F-21 GR~CCL CORRELATION 9701 05 I 1 MPF-21 CEMENT BOND LOG 9701 04 I 1 MPF-21 TDT GRAVEL PACK LOG 9701 08 I 1 :MPF-21 9 5/8" PACKER RECORD 9701 05 I 1 ' MPU K-33 STATIC TEMPERATURE PRESSURE 9701 29 I 1 MPU K-33 BRIDGE PLUG SET 970207 I 1 MPU K-33 GR/CCL DEPTH LOG 9701 29 I 1 MPU F-54 GR/CCL DEPTH LOG 9701 31 I 1 M PH-07 GR/CCL CORRELATION LOG 9701 21 I 1 M P K-06 PERFORATION RECORD 97011 2 I 1 MPK-06 GR-CCL PRIMARY DEPTH LOG 97011 2 I 1 MPE-17 CEMENT BOND LOG 9701 07 I 1 MPE-17 COMPLETION RECORD 9701 27 I 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by: ~)O~~ ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil l--I Gas [] Suspended [] Abandoned I--I Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 96-191 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22725 4. Location of well at surface .... : - ~¢,~71~~ 9. Unit or Lease Name 3773' NSL, 2031'WEL, SEC. 3, T12N, R11E !~ -/~'~'~"~'~'~'z~'-"il ~~I Milne Point Unit At top of productive interval 10. Well Number 3542' NSL, 144' EWL, SEC. 34, T13N, R11E ~ ! MPK-06 At total depth ~.~..' .'! i !.~~! 11. Field and Pool 3754' NSL, 260' EWL, SEC. 34, T13N, R11 E . ........ Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands KBE -- 63.5'I ADL 028232 12. Date Spudded12/21/96 113' Date I'D' Reached i 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 16' N°' °f C°mpleti°nsl/2/97 1/14/97 N/A MSL One 17. Total Depth (MD+TVD)10195 7304 FT1118' Plug Back Depth (MD+TVD)I19' Directi°nal Survey 120' Depth where SSSV set 121' Thickness °f Permafr°st10108 7240 FTI [~Yes l--I No N/A MD 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, EMS 23. CASlNG~ LINER AND CEMENTING RECORD CASING SE-Iq-lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 38' 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-60 35' 3751' 12-1/4" 1105 sx PF 'E', 700 sx Class 'G' 7" 26# L-80 29' 10191' 8-1/2" 447 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and i25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 spf 2-7/8", 6.5#, L-80 9717' N/A MD TVD MD TVD 9852 '-9912' 7054'-7098' 9940'-9947' 7118'-7123' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 61 bbls diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) January 22, 1997 I Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. !24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. (Subsea) Top Kuparuk 9564' 6793' KC1 9842' 6986' LCU 9908' 7033' Top Kuparuk B7 9934' 7052' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and,correct to the best of my knowledge Signed ~'V ~ ', ' ~ Tim Schofield /I.IY~ ~- . Title Senior Drillin9 Engineer Date MPK-06 ' [' 96-191 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 20 Dec 96 21 Dec 96 22 Dec 96 23 Dec 96 24 Dec 96 25 Dec 96 26 Dec 96 M Pt K Pad Progress Report Well MPK-06 Rig Page Date Duration Activity 06:00-00:00 00:00-06:00 06:00-06:30 06:30-08:30 08:30-10:00 10:00-10:30 10:30-11:00 11:00-14:00 14:00-17:00 17:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-17:30 17:30-18:00 18:00-18:30 18:30-19:15 19:15-20:00 20:00-06:00 06:00-06:30 06:30-07:30 07:30-10:30 10:30-11:00 11:00-18:00 18:00-18:30 18hr 6hr 1/2 hr 2hr 1-1/2 hr 1/2hr 1/2 hr 3hr 3hr lhr 1/2 hr 11-1/2 hr 1/2 hr llhr 1/2 hr 1/2hr 3/4 hr 3/4 hr 10hr 1/2 hr lhr 3hr 1/2 hr 7hr 1/2 hr Commissioned Drillfloor / Derrick Ran Drillpipe to 0.0 ft (5in OD) Held safety meeting Ran Drillpipe in stands to 0.0 ft Made up BHA no. 1 Tested Divertor Held safety meeting Made up BHA no. 1 Serviced Drillfloor / Derrick Installed Accessories Held safety meeting Drilled to 713.0 ft Held safety meeting Drilled to 2017.0 ft Circulated at 2017.0 ft Held safety meeting Pulled out of hole to 1077.0 ft R.I.H. to 2017.0 ft Drilled to 2959.0 ft Held safety meeting Circulated at 2959.0 ft Pulled out of hole to 1077.0 ft R.I.H. to 2959.0 ft Drilled to 3526.0 ft Held safety meeting 18:30-22:00 22:00-23:30 23:30-01:30 01:30-03:00 03:00-05:00 05:00-06:00 06:00-06:30 06:30-08:00 08:00-10:00 10:00-11:00 11:00-13:00 13:00-14:00 14:00-15:00 15:00-16:30 16:30-22:00 22:00-00:00 00:00-02:30 02:30-05:30 05:30-06:00 06:00-07:00 07:00-08:30 08:30-11:00 11:00-12:00 12:00-14:00 14:00-14:30 14:30-15:30 15:30-16:30 16:30-02:30 02:30-04:00 3-1/2 hr 1-1/2 hr 2hr 1-1/2 hr 2hr lhr 1/2 hr 1-1/2 hr 2hr lhr 2hr lhr lhr 1-1/2 hr 5-1/2 hr 2hr 2-1/2 hr 3hr 1/2 hr lhr 1-1/2 hr 2-1/2 hr lhr 2hr 1/2 hr lhr lhr 10hr 1-1/2 hr Drilled to 3765.0 ft Circulated at 3765.0 ft Pulled out of hole to 205.0 ft R.I.H. to 3765.0 ft Circulated at 3765.0 ft Pulled out of hole to 2000.0 ft Held safety meeting Pulled out of hole to 200.0 ft Pulled BHA Repaired Drillfloor / Derrick Serviced Casing handling equipment Repaired Casing handling equipment Ran Conductor to 120.0 ft (9-5/8in OD) Rigged down Fluid system Ran Casing to 3750.0 ft (9-5/8in OD) Circulated at 3750.0 ft Mixed and pumped slurry - 253.000 bbl Circulated at 1317.0 ft Mixed and pumped slurry - 150.000 bbl Mixed and pumped slurry - 317.000 bbl Rigged down Casing handling equipment Rigged down Divertor Installed Wellhead integral components Installed Adapter spool Serviced Handling equipment Serviced Bottom ram Serviced Drillfloor / Derrick Rigged up BOP stack Serviced Choke manifold 1 10 May 97 Facility Date/Time 27 Dec 96 28 Dec 96 29 Dec 96 30 Dec 96 M Pt K Pad Progress Report Well MPK-06 Rig Duration Activity 04:00-06:00 06:00-06:30 06:30-07:00 07:00-09:30 09:30-16:00 16:00-17:30 17:30-23:30 23:30-00:00 00:00-01:30 01:30-03:00 03:00-05:00 05:00-06:00 06:00-08:30 08:30-09:30 09:30-10:30 10:30-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-14:00 14:00-02:30 02:30-03:00 03:00-04:00 04:00-04:30 04:30-05:00 05:00-05:30 05:30-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-12:30 12:30-13:30 13:30-22:30 22:30-23:00 23:00-00:30 00:30-02:00 02:00-06:00 06:00-06:15 06:15-11:00 11:00-11:30 11:30-12:30 12:30-13:30 13:30-17:00 17:00-18:00 18:00-18:15 18:15-23:30 23:30-00:30 00:30-01:30 01:30-02:30 02:30-06:00 06:00-06:15 06:15-08:00 08:00-09:00 09:00-12:00 2hr 1/2 hr 1/2 hr 2-1/2 hr 6-1/2 hr 1-1/2 hr 6hr 1/2hr 1-1/2 hr 1-1/2 hr 2hr lhr 2-1/2 hr lhr lhr 1/2 hr 1/2hr lhr 1/2 hr lhr 12-1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr 1/2hr 1/2hr 4-1/2 hr lhr 9hr 1/2 hr 1-1/2 hr 1-1/2 hr 4hr 1/4hr 4-3/4 hr 1/2hr lhr lhr 3-1/2 hr lhr 1/4 hr 5-1/4 hr lhr lhr lhr 3-1/2 hr 1/4 hr 1-3/4 hr lhr 3hr Tested BOP stack Held safety meeting Tested Kill manifold Repaired Kill manifold Tested BOP stack Rig waited: Materials Made up BHA no. 2 R.I.H. to 1320.0 ft Milled Cementing packer at 1320.0 ft Repaired Standpipe manifold R.I.H. to 3664.0 ft Held drill (Stripping) Held drill (Stripping) (cont...) R.I.H. to 3656.0 ft Drilled installed equipment - DV collar Circulated at 3725.0 ft Tested Casing Drilled cement to 3725.0 ft Circulated at 3780.0 ft Performed formation integrity test Drilled to 5081.0 ft Circulated at 5081.0 ft Pulled out of hole to 3750.0 ft R.I.H. to 3947.0 ft Repaired Top drive R.I.H. to 4138.0 ft Circulated at 4138.0 ft R.I.H. to 5081.0 ft Drilled to 5115.0 ft Repaired Mud pumps Drilled to 5273.0 ft Repaired Pistons Drilled to 5743.0 ft Circulated at 5743.0 ft Pulled out of hole to 3750.0 ft R.I.H. to 5743.0 ft Drilled to 6238.0 ft Held safety meeting Drilled to 6773.0 ft Circulated at 6773.0 ft Pulled out of hole to 5642.0 ft R.I.H. to 6773.0 ft Drilled to 7149.0 ft Repaired Top drive Held safety meeting Drilled to 7807.0 ft Circulated at 7807.0 ft Pulled out of hole to 6490.0 ft R.I.H. to 7807.0 ft Drilled to 8100.0 ft Held safety meeting Drilled to 8281.0 ft Repaired Mud pumps Drilled to 8537.0 ft Page Date 2 10 May 97 Facility Date/Time 31 Dec 96 01 Jan 97 02 Jan 97 03 Jan 97 04 Jan 97 05 Jan 97 M Pt K Pad Progress Report Well MPK-06 Rig Page Date Duration Activity 12:00-13:30 13:30-16:00 16:00-22:30 22:30-00:00 00:00-06:00 06:00-06:15 06:15-08:00 08:00-09:00 09:00-15:30 15:30-17:45 17:45-18:00 18:00-21:00 21:00-06:00 06:00-06:15 06:15-16:30 16:30-17:30 17:30-18:30 18:30-19:30 19:30-06:00 06:00-08:00 08:00-08:45 08:45-09:00 09:00-09:30 09:30-11:00 11:00-13:30 13:30-17:00 17:00-19:30 19:30-04:00 04:00-06:00 06:00-11:30 11:30-12:30 12:30-14:30 14:30-17:30 17:30-19:00 19:00-21:00 06:00-15:00 15:00-19:30 19:30-20:00 20:00-21:00 21:00-22:00 22:00-22:30 22:30-01:00 01:00-02:30 02:30-05:30 05:30-06:00 06:00-10:30 10:30-13:00 13:00-17:00 1-1/2 hr 2-1/2 hr 6-1/2 hr 1-1/2 hr 6hr 1/4 hr 1-3/4 hr lhr 6-1/2 hr 2-1/4 hr 1/4 hr 3hr 9hr 1/4 hr 10-1/4 hr lhr lhr lhr 10-1/2 hr 2hr 3/4 hr 1/4 hr 1/2 hr 1-1/2 hr 2-1/2 hr 3-1/2 hr 2-1/2 hr 8-1/2 hr 2hr 5-1/2 hr lhr 2hr 3hr 1-1/2 hr 2hr 9hr 4-1/2 hr 1/2 hr lhr lhr 1/2 hr 2-1/2 hr 1-1/2 hr 3hr 1/2 hr 4-1/2 hr 2-1/2 hr 4hr Circulated at 8573.0 ft Pulled out of hole to 3662.0 ft Circulated at 3662.0 ft Pulled out of hole to 118.0 ft Pulled BHA Held safety meeting Pulled out of hole to 0.0 ft R.I.H. to 1207.0 ft Repaired Mud pumps R.I.H. to 4137.0 ft Held safety meeting R.I.H. to 8537.0 ft Drilled to 9070.0 ft Held safety meeting Drilled to 9685.0 ft Circulated at 9685.0 ft Pulled out of hole to 8254.0 ft R.I.H. to 9685.0 ft Drilled to 10150.0 ft Circulated at 10150.0 ft Pulled out of hole to 10055.0 ft R.I.H. to 10150.0 ft Drilled to 10195.0 ft Circulated at 10195.0 ft Pulled out of hole to 3750.0 ft R.I.H. to 10195.0 ft Circulated at 10195.0 ft Laid down 9038.0 ft of 5in OD drill pipe Serviced Block line Pulled BHA Retrieved Wear bushing Repaired BOP stack Rigged up Casing handling equipment Ran Casing to 120.0 ft (7in OD) Repaired Top drive Ran Casing to 10191.0 ft (7in OD) Circulated at 10191.0 ft Rigged up Cement unit Mixed and pumped slurry - 163.000 bbl Displaced slurry - 387.000 bbl Tested Casing Rigged down Cement unit Installed Seal assembly Rigged down BOP stack Installed Xmas tree Installed Xmas tree Fill pits with Water Laid out 5in drill pipe from derrick 3 10 May 97 SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPK-06 Rig Name: N-4ES AFE: 347022 Accept Date: 01/11/97 Spud Date: - Release Date: 01/14/97 Jan 12 1997 MIRU, raise scope derrick. RU cellar lines, test casing. ND tree, pull hanger, set test plug. NU BOP, change pipe rams. Test BOP, AOGCC waived witness (Chuck S.) Load shed with 2-7/8" tubing strap. PU 2-7/8". RIH with bit & 7" casing scraper. Circ tubing with brine. Cont RIH with 2-7/8" tubing with bit/scraper. Jan 13 1997 PU 2-7/8" tubing tag PBTD. Displace well with brine. LD 15 jts pipe, trip out. ND flowline, NU shooting flange. RU SWS, Run #1 GR/CCL. Rig test lub. Run #2, RIH with 7' perf guns, 9940'-9947' hole full. Run #3, RIH with 20' guns, 9892'-9912' hole full. Run #4, RIH with 20' guns, 9872'-9892' hole fill 5 bbls. Run #5, RIH with 20' guns, 9852'-9872' hole fill 6 bbls. Run #6, RIH with 6" gauge ring, junk basket to 9920', POOH. Jan 14 1997 RD SWS. ND shooting flange, NU flow nipple. PU, service ESP. TIH with 2-7/8" tubing completion ESP (drift w/running). MU midline ESP splice. TIH with ESP completion. MU hanger & pent. Splice hanger pigtail, test same-ok. Land hanger RILDS, set TWC. ND BOP, NU tree. Test adapter & tree, surface lines, test pent-ok. Pull TWC, install BPV. Displace brine with source water. Freeze protect well. Jan 15 1997 Secure tree/cellar. Rig released 01/14/97 @ 0700 hrs. Page SP~-RRY-SUN DRILLING SERVICES ~-. ANCHORAGE ALASKA PAGE 1. BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 ~ MWD SURVEY JOB NUMBER: AK-MM-.~Q199 KELLY BUSHING ELEV"~"=~'~ 61.~54~FT~'' OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES VERT. DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. .00 .00 -61.54 200.99 200.99 139.45 297.92 297.91 236.37 385.72 385.69 324.15 474.60 474.53 412.99 0 0 N .00 E .00 .00N .00E . 0 21 N 43.03 E .18 .46N .43E . 0 55 N 51.49 E .58 1.17N 1.25E 1. 1 18 N 56.35 E .46 2.16N 2.63E 3. 2 13 N 52.43 E 1.03 3.78N 4.84E 5. 00 61 62 15 62 563.59 563.41 501.87 653.59 653.23 591.69 741.69 741.01 679.47 834.00 832.88 771.34 923.00 921.40 859.86 3 16 N 50.51 E 1.20 6.45N 8.18E 9. 4 1 N 55.20 E .89 9.88N 12.75E 14. 5 31 N 53.10 E 1.73 14.20N 18.68E 21. 5 46 N 55.21 E .35 19.52N 26.06E 29. 6 4 N 55.19 E .33 24.76N 33.60E 37. 55 75 36 54 73 1013.00 1010.97 949.43 1108.50 1106.21 1044.67 1205.38 1202.99 1141.45 1299.80 1297.36 1235.82 1394.'03 1391.54 1330.00 5 3 N 44.74 E 1.59 30.30N 40.30E 45. 3 7 N 29.76 E 2.29 35.55N 44.56E 52. 1 57 N 24.59 E 1.23 39.35N 46.56E 56. 1 53 N 19.14 E .21 42.29N 47.75E 59. 1 50 N 20.42 E .07 45.18N 48.78E 62. 78 43 73 87 91 1488.00 1485.46 1423.92 1580.00 1577.41 1515.87 1675.00 1672.36 1610.82 1769.00 1766.31 1704.77 1862.83 1860.09 1798.55 1 48 N 21.47 E .05 47.97N 49.85E 65. 1 57 N 21.57 E .15 50.78N 50.96E 68. 1 55 N 26.95 E .19 53.71N 52.28E 72. 1 48 N 27.33 E .13 56.44N 53.68E 75. 1 49 N 26.26 E .04 59.10N 55.02E 78. 87 87 08 14 12 1955.90 1953.01 1891.47 2052.30 2049.00 1987.46 2143.27 2139.30 2077.76 2239.97 2234.93 2173.39 2333.85 2327.56 2266.02 4 28 N 16.10 E 2.90 63.93N 56.69E 83. 6 2 N 16.33 E 1.62 72.41N 59.16E 91. 7 46 N 18.92 E 1.93 82.82N 62.50E 102. 9 12 N 18.10 E 1.49 96.36N 67.02E 116. 9 30 N 18.55 E .32 110.85N 71.82E 131. 16 8O 55 62 65 2429.65 2421.82 2360.28 2522.46 2512.45 2450.91 2617.29 2603.91 2542.37 2711.54 2693.54 2632.00 2804.16 2780.51 2718.97 11 3 N 26.19 E 2.15 126.58N 78.39E 148. 13 46 N 24.99 E 2.94 144.58N 86.98E 168. 16 49 N 22.21 E 3.32 167.52N 96.94E 193. 19 6 N 23.71 E 2.47 194.28N 108.30E 222. 21 4 N 25.70 E 2.25 223.17N 121.62E 254. 61 53 46 4O 15 2898.25 2868.37 2806.83 2988.76 2952.17 2890.63 3086.76 3040.93 2979.39 3182.88 3126.06 3064.52 3277.03 3207.31 3145.77 20 51 N 27.05 E .56 253.33N 136.58E 287. 23 30 N 28.13 E 2.96 283.61N 152.42E 321. 26 37 N 28.46 E 3.18 320.16N 172.10E 363. 28 41 N 31.60 E 2.63 358.74N 194.45E 408. 31 58 N 30.73 E 3.51 399.43N 219.04E 455. 8O 97 49 O5 53 SPeRRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MWD SURVEY JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3370.14 3284.76 3223.22 35 27 3464.96 3360.27 3298.73 38 57 3559.45 3432.05 3370.51 42 10 3655.06 3501.40 3439.86 44 47 3842.21 3637.38 3575.84 42 0 N 27.87 E 4.11 444.50N 244.27E N 27.94 E 3.69 495.16N 271.09E N 28.67 E 3.46 549.24N 300.24E N 28.56 E 2.74 607.00N 331.75E N 30.63 E 1.68 718.82N 395.19E 507.18 564.50 625.94 691.73 820.26 3943.53 3713.69 3652.15 40 15 4038.28 3785.52 3723.98 41 9 4130.85 3854.65 3793.11 42 12 4223.93 3921.02 3859.48 46 47 4316.29 3983.54 3922.00 48 0 N 29.59 E 1.85 776.46N 428.62E N 30.53 E 1.16 829.93N 459.57E N 31.71 E 1.42 882.63N 491.39E N 30.86 E 4.96 938.37N 525.25E N 30.61 E 1.33 996.80N 559.99E 886.85 948.61 1010.10 1075.23 1143.15 4410.76 4047.17 3985.63 47 18 4504.27 4110.48 4048.94 47 28 4599.56 4173.45 4111.91 49 46 4693.43 4232.41 4170.87 52 23 . 4788 91 4289.36 4227.82 54 21 N 29.92 E .91 1057.11N 595.18E N 31.58 E 1.32 1116.24N 630.36E N 32.42 E 2.51 1176.87N 668.25E N 32.56 E 2.78 1238.47N 707.49E N 34.17 E 2.47 1302.44N 749.63E 1212.92 1281.68 1353.02 1425.85 1502.16 4882.64 4342.27 4280.73 4976.76 4393.51 4331.97 5071.64 4445.19 4383.65 5165.98 4497.45 4435.91 5259.46 4550.77 4489.23 56 54 57 7 56 51 55 52 54 34 N 33.55 E 2.76 1366.68N 792.73E N 32.22 E 1.21 1432.98N 835.59E N 30.19 E 1.82 1501.02N 876.81E N 27.78 E 2.37 1569.71N 914.87E N 27.38 E 1.43 1637.76N 950.42E 1579.16 1657.85 1737.30 1815.82 1892.59 5357.77 4608.52 4546.98 53 28 5450.05 4663.09 4601.55 54 1 5544.75 4717.95 4656.41 55 10 5639.23 4769.85 4708.31 58 10 5725.97 4815.39 4753.85 58 28 N 27.92 E 1.20 1708.22N 987.33E N 26.69 E 1.23 1774.34N 1021.46E N 27.99 E 1.66 1842.90N 1056.91E N 29.72 E 3.52 1912.03N 1095.03E N 29.87 E .37 1976.09N 1131.71E 1972.13 2046.53 2123.70 2202.64 2276.43 5820.91 4865.36 4803.82 58 0 5912.06 4913.98 4852.44 57 31 6008.06 4965.01 4903.47 58 14 6102.42 5014.94 4953.40 57 51 6197.35 5065.52 5003.98 57 45 N 30.45 E .71 2045.88N 1172.26E N 28.38 E 1.99 2113.03N 1210.13E N 28.13 E .77 2184.66N 1248.62E N 28.28 E .43 2255.21N 1286.46E N 27.50 E .70 2326.21N 1324.04E 2357.11 2434.19 2515.49 2595.56 2675.89 6291.72 5114.44 5052.90 59 47 6385.16 5161.76 5100.22 59 20 6480.27 5210.43 5148.89 59 5 6575.61 5259.64 5198.10 58 45 6666.99 5307.47 5245.93 58 6 N 26.83 E 2.26 2398.00N 1360.87E N 26.46 E .60 2470.01N 1397.00E N 26.60 E .28 2543.12N 1433.50E N 26.89 E .44 2616.05N 1470.25E N 26.35 E .87 2685.65N 1505.13E 2756.56 2837.09 2918.77 3000.40 3078.22 SR~ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MWD SURVEY JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULkR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6761.85 5356.66 5295.12 59 24 6856.24 5405.12 5343.58 58 48 6950.98 5454.38 5392.84 58 31 7046.72 5503.28 5441.74 60 2 7140.31 5550.20 5488.66 59 47 N 26.78 E 1.42 2758.19N 1541.41E N 26.54 E .67 2830.58N 1577.75E N 27.34 E .78 2902.72N 1614.41E N 27.01 E 1.60 2975.94N 1652.00E N 27.73 E .72 3047.85N 1689.23E 3159.28 3240.25 3321.15 3403.44 3484.41 7235.59 5598.38 5536.84 7327.99 5645.79 5584.25 7422.65 5694.83 5633.29 7514.40 5742.45 5680.91 7608.22 5790.84 5729.30 59 27 58 48 58 46 58 41 59 13 N 27.86 E .38 3120.56N 1727.56E N 26.27 E 1.63 3191.18N 1763.64E N 24.57 E 1.54 3264.30N 1798.39E N 24.99 E .40 3335.50N 1831.26E N 24.03 E 1.04 3408.64N 1864.61E 3566.60 3645.88 3726.74 3805.01 3885.22 7701.64 5838.96 5777.42 7790.36 5885.24 5823.70 7883.33 5934.29 5872.75 7978.52 5983.74 5922.20 8071.68 6031.47 5969.93 58 46 58 20 57 58 59 24 58 57 N 24.90 E .93 3481.52N 1897.76E N 24.88 E .48 3550.18N 1929.62E N 24.21 E .72 3622.02N 1962.43E N 23.87 E 1.53 3696.29N 1995.56E N 24.82 E 1.01 3769.18N 2028.54E 3965.11 4040.66 4119.47 4200.57 4280.38 8163.79 6079.39 6017.85 58 20 8258.29 6129.58 6068.04 57 29 8356.84 6182.23 6120.69 57 55 8448.98 6231.54 6170.00 57 22 8543.91 6283.02 6221.48 56 57 N 25.32 E .80 3840.43N 2061.86E N 25.12 E .93 3912.86N 2095.98E N 27.43 E 2.03 3987.55N 2132.85E N 27.38 E .60 4056.65N 2168.68E N 26.76 E .70 4127.67N 2204.98E 4358.92 4438.87 4522.10 4599.93 4679.67 8636.87 6332.99 6271.45 58 8732.31 6384.66 6323.12 56 8827.30 6437.86 6376.32 55 8919.44 6487.92 6426.38 58 9012.45 6536.78 6475.24 57 0 25 27 42 54 N 27.48 E 1.30 4197.43N 2240.71E N 27.71 E 1.66 4268.53N 2277.87E N 27.98 E 1.05 4338.12N 2314.63E N 28.44 E 3.55 4406.27N 2351.19E N 28.81 E .93 4475.73N 2389.10E 4758.04 4838.26 4916.95 4994.29 5073.43 9108.25 6588.42 6526.88 56 52 9201.52 6639.87 6578.33 56 9 9297.14 6693.82 6632.28 55 9 9392.26 6748.68 6687.14 54 24 9485.28 6804.63 6743.09 51 38 N 28.83 E 1.08 4546.43N 2428.00E N 29.30 E .87 4614.42N 2465.79E N 28.85 E 1.13 4683.42N 2504.16E N 28.62 E .81 4751.55N 2541.51E N 27.31 E 3.17 4817.16N 2576.37E 5154.11 5231.89 5310.83 5388.53 5462.83 9579.82 6865.04 6803.50 48 55 9673.94 6928.17 6866.63 46 48 9767.85 6993.93 6932.39 44 17 9862.41 7061.79 7000.25 43 58 9957.50 7130.30 7068.76 43 49 N 27.25 E 2.88 4881.79N 2609.69E N 27.48 E 2.25 4943.76N 2641.77E N 28.37 E 2.76 5003.00N 2673.15E N 28.04 E .42 5061.03N 2704.28E N 28.58 E .42 5119.09N 2735.55E 5535.53 5605.30 5672.34 5738.19 5804.13 S~'%ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MWD SURVEY JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10050.87 7198.20 7136.66 42 50 N 28.86 E 1.07 10084.14 7222.66 7161.12 42 31 N 28.96 E .98 10195.00 7304.35 7242.81 42 31 N 28.96 E .00 5175.29N 2766.34E 5868.21 5195.03N 2777.25E 5890.77 5260.60N 2813.53E 5965.70 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5965.73 FEET AT NORTH 28 DEG. 8 MIN. EAST AT MD = 10195 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 28.30 DEG. TIE-IN AT SURFACE PROJECTED SURVEY AT 10195'MD PAGE 5 SPeRRY-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION (AIJ~SKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -61.54 .00 N .00 E 1000.00 998.02 936.48 29.48 N 39.50 E 2000.00 1996.98 1935.44 67.24 N 57.64 E 3000.00 2962.47 2900.93 287.59 N 154.55 E 4000.00 3756.70 3695.16 808.23 N 446.78 E .00 1.98 1.98 3.02 1.04 37.53 34.51 243.30 205.77 5000.00 4406.13 4344.59 1449.49 N 845.99 E 59 6000.00 4960.77 4899.23 2178.61 N 1245.39 E 103 7000.00 5479.95 5418.41 2939.87 N 1633.62 E 152 8000.00 5994.67 5933.13 3713.20 N 2003.04 E 200 9000.00 6530.17 6468.63 4466.49 N 2384.02 E 246 3.87 350.57 9.23 445.36 0.05 480.82 5.33 485.27 9.83 464.51 10000.00 7160.96 7099.42 5144.93 N 2749.63 E 10195.00 7304.35 7242.81 5260.60 N 2813.53 E 2839.04 369.21 2890.65 51.60 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~-RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -61.54 61.54 61.54 .00 161.54 161.54 100.00 261.54 261.54 200.00 361.56 361.54 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .28 N .26 E .00 .00 .81 N .79 E .00 .00 1.86 N 2.17 E .02 .02 461.60 461.54 400.00 561.71 561.54 500.00 661.92 661.54 600.00 762.31 761.54 700.00 862.81 861.54 800.00 3.47 N 4.45 6.38 N 8.09 10.22 N 13.23 15.39 N 20.27 21.17 N 28.44 E .06 .04 E .17 .11 E .38 .21 E .77 .39 E 1.27 .50 963.36 961.54 900.00 1063.76 1061.54 1000.00 1163.90 1161.54 1100.00 1263.96 1261.54 1200.00 1364.01 1361.54 1300.00 27.20 N 37.06 33.42 N 43.33 38.06 N 45.97 41.18 N 47.36 44.28 N 48.45 E 1.82 .55 E 2.22 .39 E 2.36 .15 E 2.42 .06 E 2.47 .05 1464.07 1461.54 t400.00 1564.12 1561.54 1500.00 1664.18 1661.54 1600.00 1764.23 1761.54 1700.00 1864.28 1861.54 1800.00 47.27 N 49.58 50.28 N 50.76 53.39 N 52.11 56.31 N 53.61 59.16 N 55.04 E 2.53 .05 E 2.58 .05 E 2.64 .06 E 2.69 .05 E 2.74 .05 1964.45 1961.54 1900.00 2064.91 2061.54 2000.00 2165.72 2161.54 2100.00 2266.93 2261.54 2200.00 2368.30 2361.54 2300.00 64.57 N 56.87 73.68 N 59.53 85.69 N 63.48 100.46 N 68.36 116.24 N 73.63 E 2.91 .17 E 3.37 .46 E 4.18 .81 E 5.39 1.21 E 6.76 1.37 2470.21 2461.54 2400.00 2573.19 2561.54 2500.00 2677.68 2661.54 2600.00 2783.83 2761.54 2700.00 2890.94 2861.54 2800.00 133.97 N 81.97 156.26 N 92.21 184.14 N 103.85 216.58 N 118.45 251.02 N 135.39 E 8.67 1.91 E 11.65 2.98 E 16.14 4.48 E 22.29 6.15 E 29.40 7.11 2998.99 2961.54 2900.00 3109.81 3061.54 3000.00 3223.62 3161.54 3100.00 3341.83 3261.54 3200.00 3466.61 3361.54 3300.00 287.24 N 154.36 329.24 N 177.02 375.83 N 204.88 430.24 N 236.59 496.09 N 271.59 E 37.45 8.05 E 48.27 10.82 E 62.08 13.81 E 80.29 18.21 E 105.07 24.78 Sp~ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3599.60 3461.54 3400.00 3738.90 3561.54 3500.00 3874.73 3661.54 3600.00 4006.43 3761.54 3700.00 4140.19 3861.54 3800.00 573.16 N 313.30 658.09 N 360.07 737.54 N 406.27 811.88 N 448.93 887.99 N 494.70 138.06 32.99 177.36 39.29 213.19 35.83 244.89 31.71 278.65 33.76 4283.42 3961.54 3900.00 4431.95 4061.54 4000.00 4581.12 4161.54 4100.00 4741.21 4261.54 4200.00 4917.92 4361..54 4300.00 975.78 N 547.55 1070.61 N 602.95 1164.98 N 660.70 1270.38 N 727.89 1391.32 N 809.06 321.88 43.22 370.41 48.54 419.58 49.16 479.67 60.10 556.38 76.71 5101.54 4461.54 4400.00 5278.04 4561.54 4500.00 5447.41 4661.54 4600.00 5623.61 4761.54 4700.00 5813.69 4861.54 4800.00 1522.66 N 889.39 1651.20 N 957.38 1772.43 N 1020.50 1900.52 N 1088.50 2040.60 N 1169.16 640.00 83.61 716.50 76.51 785.87 69.36 862.07 76.21 952.15 90.08 6001.46 4961.54 4900.00 6189.89 5061.54 5000.00 6384.72 5161.54 5100.00 6579.28 5261.54 5200.00 6771.43 5361.54 5300.00 2179.71 N 1245.97 2320.61 N 1321.12 2469.68 N 1396.83 2618.84 N 1471.67 2765.55 N 1545.12 1039.92 87.77 1128.35 88.42 1223.18 94.84 1317.74 94.55 1409.89 92.15 6964.69 5461.54 5400.00 7162.85 5561.54 5500.00 7358.40 5661.54 5600.00 7551.13 5761.54 5700.00 7745.15 5861.54 5800.00 2913.10 N 1619.78 3065.10 N 1698.29 3214.51 N 1775.16 3363.94 N 1844.52 3515.25 N 1913.42 1503.15 93.26 1601.31 98.17 1696.86 95.54 1789.59 92.73 1883.61 94.02 7935.00 5961.54 5900.00 8129.76 6061.54 6000.00 8317.88 6161.54 6100.00 8504.52 6261.54 6200.00 8690.40 6361.54 6300.00 3662.07 N 1980.40 3814.25 N 2049.48 3958.24 N 2117.68 4098.18 N 2190.11 4237.58 N 2261.63 1973.46 89.85 2068.22 94.76 2156.34 88.12 2242.98 86.64 2328.86 85.88 8869.94 6461.54 6400.00 9059.04 6561.54 6500.00 9240.42 6661.54 6600.00 9414.14 6761.54 6700.00 9574.46 6861.54 6800.00 4369.39 N 2331.33 4510.31 N 2408.12 4642.60 N 2481.60 4767.12 N 2549.95 4878.18 N 2607.84 2408.40 79.54 2497.50 89.10 2578.88 81.38 2652.60 73.73 2712.92 60.32 S~ERRY-SUN DRILLING SERVICES · ANCI{ORAGE ALASKA PAGE 8 BP EXPLORATION (ALJ~SKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-MM-60199 KELLY BUSHING ELEV. = 61.54 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9722.11 6961.54 6900.00 9862.07 7061.54 7000.00 10000.80 7161.54 7100.00 10136.90 7261.54 7200.00 10195.00 7304.35 7242.81 4974.52 N 2657.92 E 2760.57 47.65 5060.82 N 2704.17 E 2800.53 39.96 5145.41 N 2749.89 E 2839.26 38.73 5226.24 N 2794.51 E 2875.36 36.11 5260.60 N 2813.53 E 2890.65 15.28 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS TIE-IN SURVEY AT 0.00' MD PROJECTED SURVEY TO TD AT 10195.00' MD SPERRY-SUN DRILLING SERVICES BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH ANCHORAGE ALASKA - ,~.~ ?' ~i~.~.~~ - ~ DATE OF SURVEY: 010297 MAGNETIC MULTI-SHOT SURVEY · JOB NI/MBER: AK-EI-70001 · KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION COURS _COi/RSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. .00 .00 -60.90 0 0 N .00 E .00 .00N .00E .00 200.99 200.99 140.09 0 21 N 43.03 E .18 .46N .43E .61 297.92 297.91 237.01 0 55 N 51.49 E .58 1.17N 1.25E 1.62 385.72 385.69 324.79 1 18 N 56.35 E .46 2.16N 2.63E 3.15 474.60 474.53 413.63 2 13 N 52.43 E 1.03 3.78N 4.84E 5.62 563.59 563.41 502.51 3 16 N 50.51 E 1.20 6.45N 8.18E 9.55 653.59 653.23 592.33 4 1 N 55.20 E .89 9.88N 12.75E 14.75 741.69 741.01 680.11 5 31 N 53.10 E 1.73 14.20N 18.68E 21.36 834.00 832.88 771.98 5 46 N 55.21 E .35 19.52N 26.06E 29.54 923.00 921.40 860.50 6 ' 4 N 55.19 E .33 24.76N 33.60E 37.73 1013.00 1010.97 950.07 5 3 N 44.74 E 1.59 30.30N 40.30E 45.78 1108.50 1106.21 1045.31 3 7 N 29.76 E 2.29 35.55N 44.56E 52.43 1205.38 1202.99 1142.09 1 57 N 24.59 E 1.23 39.35N 46.56E 56.73 1299.80 1297.36 1236.46 1 53 N 19.14 E .21 42.29N 47.75E 59.87 1394.03 1391.54 1330..64 1 50 N 20.42 E .07 45.18N 48.78E 62.91 1488.00 1485.46 1424.56 1 48 N 21.47 E .05 47.97N 49.85E 65.87 1580.00 1577.41 1516.51 1 57 N 21.57 E .15 50.78N 50.96E 68.87 1675.00 1672.36 1611.46 1 55 N 26.95 E .19 53.71N 52.28E 72.08 1769.00 1766.31 1705.41 1 48 N 27.33 E .13 56.44N 53.68E 75.14 1862.83 1860.09 1799.19 1 49 N 26.26 E .04 59.10N 55.02E 78.12 1955.90 1953.01 1892.11 4 28 N 16.10 E 2.90 63.93N 56.69E 83.16 2052.30 2049.00 1988.10 6 2 N 16.33 E 1.62 72.41N 59.16E 91.80 2143.27 2139.30 2078.40 7 46 N 18.92 E 1.93 82.82N 62.50E 102.55 2239.97 2234.93 2174.03 9 12 N 18.10 E 1.49 96.36N 67.02E 116.62 2333.85 2327.56 2266.66 9 30 N 18.55 E .32 110.85N 71.82E 131.65 2429.65 2421.82 2360.92 11 3 N 26.19 E 2.15 126.58N 78.39E 148.61 2522.46 2512.45 2451.55 13 46 N 24.99 E 2.94 144.58N 86.98E 168.53 2617.29 2603.91 2543.01 16 49 N 22.21 E 3.32 167.52N 96.94E 193.46 2711.54 2693.54 2632.64 19 6 N 23.71 E 2.47 194.28N 108.30E 222.40 2804.16 2780.51 2719.61 21 4 N 25.70 E 2.25 223.17N 121.62E 254.15 2898.25 2868.37 2807.47 20 51 N 27.05 E .56 253.33N 136.58E 287.80 2988.76 2952.17 2891.27 23 30 N 28.13 E 2.96 283.61N 152.42E 321.97 3086.76 3040.93 2980.03 26 37 N 28.46 E 3.18 320.16N 172.10E 363.49 3182.88 3126.06 3065.16 28 41 N 31.60 E 2.63 358.74N 194.45E 408.05 3277.03 3207.31 3146.41 31 58 N 30.73 E 3.51 399.43N 219.04E 455.53 SP~RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3370.14 3284.76 3223.86 35 27 3464.96 3360.27 3299.37 38 57 3559.45 3432.05 3371.15 42 10 3655.06 3501.40 3440.50 44 47 3842.21 3637.38 3576.48 42 0 N 27.87 E 4.11 444.50N 244.27E N 27.94 E 3.69 495.16N 271.09E N 28.67 E 3.46 549.24N 300.24E N 28.56 E 2.74 607.00N 331.75E N 30.63 E 1.68 718.82N 395.19E 507.18 564.50 625.94 691.73 820.26 3943.53 3713.69 3652.79 40 15 4038.28 3785.52 3724.62 41 9 4130.85 3854.65 3793.75 42 12 4223.93 3921.02 3860.12' 46 47 4316.29 3983.54 3922.64 48 0 N 29.59 E 1.85 776.46N 428.62E N 30.53 E 1.16 829.93N 459.57E N 31.71 E 1.42 882.63N 491.39E N 30.86 E 4.96 938.37N 525.25E N 30.61 E 1.33 996.80N 559.99E 886.85 948.61 1010.10 1075.23 1143.15 4410.76 4047.17 3986.27 47 18 4504.27 4110.48 4049.58 47 28 4599.56 4173.45 4112.55 49 46 4693.43 4232.41 4171.51 52 23 4788.91 4289.36 4228.46 54 21 N 29.92 E .91 1057.11N 595.18E N 31.58 E 1.32 1116.24N 630.36E N 32.42 E 2.51 1176.87N 668.25E N 32.56 E 2.78 1238.47N 707.49E N 34.17 E 2.47 1302.44N 749.63E 1212.92 1281.68 1353.02 1425.85 1502.16 4882.64 4342.27 4281.37 4976.76 4393.51 4332.61 5071.64 4445.19 4384.29 5165.98 4497.45 4436.55 5259.46 4550.77 4489.87 56 54 57 7 56 51 55 52 54 34 N 33.55 E 2.76 1366.68N 792.73E N 32.22 E 1.21 1432.98N 835.59E N 30.19 E 1.82 1501.02N 876.81E N 27.78 E 2.37 1569.71N 914.87E N 27.38 E 1.43 1637.76N 950.42E 1579.16 1657.85 1737.30 1815.82 1892.59 5357.77 4608.52 4547.62 53 28 5450.05 4663.09 4602.19 54 1 5544.75 4717.95 4657.05 55 10 5639.23 4769.85 4708.95 58 10 5725.97 4815.39 4754.49 58 28 N 27.92 E 1.20 1708.22N 987.33E N 26.69 E 1.23 1774.34N 1021.46E N 27.99 E 1.66 1842.90N 1056.91E N 29.72 E 3.52 1912.03N 1095.03E N 29.87 E .37 1976.09N 1131.71E 1972.13 2046.53 2123.70 2202.64 2276.43 5820.91 4865.36 4804.46 58 0 5912.06 4913.98 4853.08 57 31 6008.06 4965.01 4904.11 58 14 6102.42 5014.94 4954.04 57 51 6197.35 5065.52 5004.62 57 45 N 30.45 E .71 2045.88N 1172.26E N 28.38 E 1.99 2113.03N 1210.13E N 28.13 E .77 2184.66N 1248.62E N 28.28 E .43 2255.21N 1286.46E N 27.50 E .70 2326.21N 1324.04E 2357.11 2434.19 2515.49 2595.56 2675.89 6291.72 5114.44 5053.54 59 47 6385.16 5161.76 5100.86 59 20 6480.27 5210.43 5149.53 59 5 6575.61 5259.64 5198.74 58 45 6666.99 5307.47 5246.57 58 6 N 26.83 E 2.26 2398.00N 1360.87E N 26.46 E .60 2470.01N 1397.00E N 26.60 E .28 2543.12N 1433.50E N 26.89 E .44 2616.05N 1470.25E N 26.35 E .87 2685.65N 1505.13E 2756.56 2837.09 2918.77 3000.40 3078.22 SP-ERRY-SUN DRILLING SERVICES · ANCHOR_AGE ALASKA PAGE 3 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DGMN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6761.85 5356.66 5295.76 59 24 6856.24 5405.12 5344.22 58 48 6950.98 5454.38 5393.48 58 31 7046.72 5503.28 5442.38 60 2 7140.31 5550.20 5489.30 59 47 N 26.78 E 1.42 2758.19N 1541.41E N 26.54 E .67 2830.58N 1577.75E N 27.34 E .78 2902.72N 1614.41E N 27.01 E 1.60 2975.94N 1652.00E N 27.73 E .72 3047.85N 1689.23E 3159.28 3240.25 3321.15 3403.44 3484.41 7235.59 5598.38 5537.48 59 27 7327.99 5645.79 5584.89 58 48 7422.65 5694.83 5633.94 58 46 7514.40 5742.45 5681.55 58 41 7608.22 5790.84 5729.94 59 13 N 27.86 E .38 3120.56N 1727.56E N 26.27 E 1.63 3191.18N 1763.64E N 24.57 E 1.54 3264.30N 1798.39E N 24.99 E .40 3335.50N 1831.26E N 24.03 E 1.04 3408.64N 1864.61E 3566.60 3645.88 3726.74 3805.01 3885.22 7701.64 5838.96 5778.06 7790.36 5885.24 5824.34 7883.33 5934.29 5873.39 7978.52 5983.74 5922.84 8071.68 6031.47 5970.57 58 46 58 20 57 58 59 24 58 57 N 24.90 E .93 3481.52N 1897.76E N 24.88 E .48 3550.18N 1929.62E N 24.21 E .72 3622.02N 1962.43E N 23.87 E 1.53 3696.29N 1995.56E N 24.82 E 1.01 3769.18N 2028.54E 3965.11 4040.66 4119.47 4200.57 4280.38 8163.79 6079.39 6018.49 8258.29 6129.58 6068.68 8356.84 6182.23 6121.33 8448.98 6231.54 6170.64 8543.91 6283.02 6222.12 58 20 57 29 57 55 57 22 56 57 N 25.32 E .80 3840.43N 2061.86E N 25.12 E .93 3912.86N 2095.98E N 27.43 E 2.03 3987.55N 2132.85E N 27.38 E .60 4056.65N 2168.68E N 26.76 E .70 4127.67N 2204.98E 4358.92 4438.87 4522.10 4599.93 4679.67 8636.87 6332.99 6272.09 58 0 8732.31 6384.66 6323.76 56 25 8827.30 6437.86 6376.96 55 27 8919.44 6487.92 6427.02 58 42 9012.45 6536.78 6475.88 57 54 N 27.48 E 1.30 4197.43N 2240.71E N 27.71 E 1.66 4268.53N 2277.87E N 27.98 E 1.05 4338.12N 2314.63E N 28.44 E 3.55 4406.27N 2351.19E N 28.81 E .93 4475.73N 2389.10E 4758.04 4838.26 4916.95 4994.29 5073.43 9108.25 6588.42 6527.52 56 52 9201.52 6639.87 6578.97 56 9 9297.14 6693.82 6632.92 55 9 9392.26 6748.68 6687.78 54 24 9485.28 6804.63 6743.73 51 38 N 28.83 E 1.08 4546.43N 2428.00E N 29.30 E .87 4614.42N 2465.79E N 28.85 E 1.13 4683.42N 2504.16E N 28.62 E .81 4751.55N 2541.51E N 27.31 E 3.17 4817.16N 2576.37E 5154.11 5231.89 5310.83 5388.53 5462.83 9579.82 6865.04 6804.14 9673.94 6928.17 6867.27 9767.85 6993.93 6933.03 9862.41 7061.79 7000.89 9957.50 7130.30 7069.40 48 55 46 48 44 17 43 58 43 49 N 27.25 E 2.88 4881.79N 2609.69E N 27.48 E 2.25 4943.76N 2641.77E N 28.37 E 2.76 5003.00N 2673.15E N 28.04 E .42 5061.03N 2704.28E N 28.58 E .42 5119.09N 2735.55E 5535.53 5605.30 5672.34 5738.19 5804.13 PAGE 4 S~ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10050.87 7198.20 7137.30 42 50 N 28.86 E 1.07 10084.14 7222.66 7161.76 42 31 N 28.96 E .98 10205.00 7311.72 7250.82 42 31 N 28.96 E .00 5175.29N 2766.34E 5868.21 5195.03N 2777.25E 5890.77 5266.52N 2816.80E 5972.46 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5972.48 FEET AT NORTH 28 DEG. 8 MIN. EAST AT MD = 10205 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 28.30 DEG. TIE-IN SURVEY AT SURFACE 0.00' MD PROJECTED SURVEY AT 10,205.00' MD SpeRRY-SUN DRILLING SERVICES ANCHOPJtGE AI_JkS KA PAGE 5 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -60.90 .00 N .00 E 1000.00 998.02 937.12 29.48 N 39.50 E 2000.00 1996.98 1936.08 67.24 N 57.64 E 3000.00 2962.47 2901.57 287.59 N 154.55 E 4000.00 3756.70 3695.80 808.23 N 446.78 E .00 1.98 1.98 3.02 1.04 37.53 34.51 243.30 205.77 5000.00 4406.13 4345.23 1449.49 N 845.99 E 6000.00 4960.77 4899.87 2178.61 N 1245.39 E 7000.00 5479.95 5419.05 2939.87 N 1633.62 E 8000.00 5994.67 5933.77 3713.20 N 2003.04 E 9000.00 6530.17 6469.27 4466.49 N 2384.02 E 593.87 350.57 1039.23 445.36 1520.05 480.82 2005.33 485.27 2469.83 464.51 10000.00 7160.96 7100.06 5144.93 N 2749.63 E 2839.04 369.21 10205.00 7311.72 7250.82 5266.52 N 2816.80 E 2893.28 54.24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SD--ERRY-SUN DRILLING SERVICES ANCHOR3~GE AI_J~S KA PAGE 6 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -60.90 60.90 60.90 .00 160.90 160.90 100.00 260.90 260.90 200.00 360.92 360.90 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .28 N .26 E .00 .00 .80 N .78 E .00 .00 1.85 N 2.16 E .02 .02 460.96 460.90 400.00 561.07 560.90 500.00 661.28 660.90 600.00 761.67 760.90 700.00 862.17 860.90 800.00 3.45 N 4.43 E .06 .04 6.36 N 8.06 E .17 .11 10.19 N 13.20 E .38 .21 15.35 N 20.22 E .77 .39 21.14 N 28.39 E 1.27 .50 962.72 960.90 900.00 1063.12 1060.90 1000.00 1163.26 1160.90 1100.00 1263.32 1260.90 1200.00 1363.37 1360.90 1300.00 27.16 N 37.01 E 33.39 N 43.31 E 38.04 N 45.96 E 41.16 N 47.35 E 44.26 N 48.44 E 1.82 .55 2.22 .40 2.36 .15 2.42 .06 2.47 .05 1463.42 1460.90 1400.00 1563.48 1560.90 1500.00 1663.54 1660.90 1600.00 1763.59 1760.90 1700.00 1863.64 1860.90 1800.00 47.25 N 49.57 E 50.26 N 50.75 E 53.37 N 52.10 E 56.29 N 53.60 E 59.14 N 55.03 E 2.52 .05 2.58 .05 2.64 .06 2.69 .05 2.74 .05 1963.81 1960.90 1900.00 2064.27 2060.90 2000.00 2165.07 2160.90 2100.00 2266.28 2260.90 2200.00 2367.65 2360.90 2300.00 64.52 N 56.86 E 73.62 N 59.51 E 85.61 N 63.45 E 100.36 N 68.33 E 116.14 N 73.59 E 2.91 .17 3.37 .46 4.17 .80 5.38 1.21 6.75 1.37 2469.56 2460.90 2400.00 2572.53 2560.90 2500.00 2677.00 2660.90 2600.00 2783.14 2760.90 2700.00 2890.26 2860.90 2800.00 133.84 N 81.91 E 156.10 N 92.14 E 183.95 N 103.77 E 216.36 N 118.34 E 250.80 N 135.28 E 8.66 1.91 11.63 2.97 16.10 4.47 22.24 6.14 29.36 7.11 2998.29 2960.90 2900.00 3109.09 3060.90 3000.00 3222.88 3160.90 3100.00 3341.05 3260.90 3200.00 3465.78 3360.90 3300.00 286.99 N 154.23 E 328.96 N 176.87 E 375.51 N 204.68 E 429.85 N 236.38 E 495.63 N 271.35 E 37.39 8.04 48.19 10.80 61.98 13.78 80.15 18.18 104.88 24.73 Sp~E~RRY-SUN DRILLING SERVICES · · ANCHORAGE ALASKA PAGE 7 BP EXPLORATION (ALASKA) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 4/97 DATE OF SURVEY: 010297 JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3598.73 3460.90 3400.00 3738.01 3560.90 3500.00 3873.86 3660.90 3600.00 4005.58 3760.90 3700.00 4139.33 3860.90 3800.00 572.63 N 313.01 E 657.56 N 359.77 E 737.05 N 405.98 E 811.39 N 448.64 E 887.49 N 494.40 E 137.83 32.94 177.11 39.28 212.96 35.85 244.68 31.72 278.43 33.74 4282.46 3960.90 3900.00 4431.01 4060.90 4000.00 4580.13 4160.90 4100.00 4740.12 4260.90 4200.00 4916.75 4360.90 4300.00 975.17 N 1070.01 N 1164.34 N 1269.64 N 1390.50 N 547.19 E 321.56 43.13 602.60 E 370.11 48.55 660.30 E 419.23 49.12 727.39 E 479.22 59.99 808.52 E 555.85 76.63 5100.37 4460.90 4400.00 5276.94 4560.90 4500.00 5446.'32 4660.90 4600.00 5622.41 4760.90 4700.00 5812.48 4860.90 4800.00 1521.82 N 1650.40 N 1771.64 N 1899.64 N 2039.72 N 888.90 E 639.47 83.62 956.97 E 716.04 76.57 1020.10 E 785.42 69.38 1088.00 E 861.51 76.09 1168.64 E 951.58 90.07 6000.25 4960.90 4900.00 6188.69 5060.90 5000.00 6383.47 5160.90 5100.00 6578.04 5260.90 5200.00 6770.17 5360.90 5300.00 2178.80 N 2319.71 N 2468.71 N 2617.90 N 2764.58 N 1245.49 E 1039.35 87.77 1320.65 E 1127.79 88.44 1396.35 E 1222.57 94.78 1471.19 E 1317.14 94.57 1544.63 E 1409.27 92.13 6963.46 5460.90 5400.00 7161.58 5560.90 5500.00 7357.16 5660.90 5600.00 7549.90 5760.90 5700.00 7743.93 5860.90 5800.00 2912.17 N 3064.12 N 3213.56 N 3362.99 N 3514.31 N 1619.30 E 1502.56 93.29 1697.78 E 1600.68 98.12 1774.69 E 1696.26 95.58 1844.08 E 1789.00 92.73 1912.98 E 1883.03 94.03 7933.77 5960.90 5900.00 8128.54 6060.90 6000.00 8316.68 6160.90 6100.00 8503.34 6260.90 6200.00 8689.23 6360.90 6300.00 3661.11 N 3813.31 N 3957.33 N 4097.30 N 4236.72 N 1979.97 E 1972.87 89.85 2049.03 E 2067.65 94.77 2117.22 E 2155.78 88.14 2189.67 E 2242.44 86.66 2261.17 E 2328.33 85.89 8868.76 6460.90 6400.00 9057.83 6560.90 6500.00 9239.28 6660.90 6600.00 9413.06 6760.90 6700.00 9573.48 6860.90 6800.00 4368.52 N 4509.42 N 4641.77 N 4766.35 N 4877.52 N 2330.86 E 2407.86 79.53 2407.63 E 2496.93 89.07 2481.14 E 2578.38 81.44 2549.53 E 2652.16 73.78 2607.50 E 2712.58 60.42 S~P~ERRY-SUN DRILLING SERVICES D~NCHOR. AGE AL~AS KA PAGE 8 BP EXPLORATION (AI~AS~) MILNE POINT / MPK-06 500292272500 NORTH SLOPE BOROUGH COMPUTATION DATE: 2 / 4 / 97 DATE OF SURVEY: 010297 JOB NUMBER: AK-EI-70001 KELLY BUSHING ELEV. = 60.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED V~LUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TXrD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9721.20 6960.90 .6900.00 9861.18 7060.90 7000.00 9999.92 7160.90 7100.00 10136.04 7260.90 7200.00 10205.00 7311.72 7250.82 4973.95 N 2657.62 E 2760.30 47.72 5060.28 N 2703.88 E 2800.28 39.98 5144.89 N 2749.60 E 2839.02 38.74 5225.73 N 2794.23 E 2875.13 36.11 5266.52 N 2816.80 E 2893.28 18.14 THE CALCULJ~TION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS TIE-IN SURVEY AT 0.00' MD PROJECTED SURVEY TO TD AT 10205.00' MD NORTH SLOPE LEASE STATUS INDEX (Leases Current To June 30, 1995) I ' "W COR SEC 30, 19" "SEC 30, 29, 19,20 .... SEC 29. 28, 20, 21 .... SEC 28, 27, 21, 22" "SEC 27 26 22, 23" "W COR SEC 31, 30" ' 533.54 89°26'49"\ SW COR SEC 31 T13N R11E .. "SEC 30, 29, 31, 32" 533.54 -, 89°24'26" "S COR SEC 31, 32" T13N R11E N COR SEC 5 & 4 T12N R11E "SEC 29, 28, 32, 33" COR SEC 32, 33" T13NR11E ...- ~ N COR SEC 4 & 3 T12N R11E " "SEC 5, 4, 8, 9 " "SEC 4, 3, 9, 10 " "SEC 8, 9, 17, 16" "SEC 9, 10, 16, 15 " "SEC 28, 27, 33, 34" 533.54 89"19'32"--~ "S COR SEC 34, 35" T13N R11E N COR SEC 3 & 2 T12N R11E "SEC 3, 2, 10, 11" tt "SEC 10, 15, 14" "SEC 27, 26, 34, 35" "S COR SEC 33, 34" T13N R11E N COR SEC 2 & 1 T12N R11E "SEC 2, 1, 11, 12" "SEC 11, 12, 14, 13" NE SEC 1 T12N R11E "E SEC 1, 12" "E SEC 12, 13" 29 , ' ~,.~. ',,i.! ',,; 27,,,",',1 ',,'26'~,,', , ARCO NW ~' , II , ~ ' I ' . t~,.~ I,,: '! , · . I ............ ~ ~: 2,.L ':,- 2'.... L L.._ ~ .I ..... ), ~. _ '.' L'__ __.~ 34 i 35 I ,, '36 ............... 1 ..... ~;;~;i-~; ........... ~-i BP E &!O 64.38 ~n "7o, ' :: i '"' I BPX',26.81 . M¢~ 111 0-30-7D2 / -/3 Y USA 8.1~1 ,' P ' ~. ~ 10-,~0-79 147E¢~4 AD L 04;7A'33 :{"'-~AD L0:47,432" ~4.3,8 BP E & .~0..'(~88'" BP E & ~ ·64.38 ~ ,BPXi"~'¢~ .~PX 26.8~1 ~A 8.81 oXy 0SA 8.81 ~ U¢A 8.81 I~Rt-0E ....~";' ' MP, U : 01-29-01 ,~,,,,,,D' A;BL ~:',3p-7~4 191 025516 BPX OXY tjSA 35 01 ADLO25 OXY USA 8.81 AD[_3S0109 ", .ac61 SO.GO t BP E -2~-01a2 %0: "91.19 USA ~ E-14 7 0' 1-0@ ADL', CHEVRO 2303-i7-8¢4 ADL025637 AD ~. 26 25 MOBIL :", 0,4 r~O 9 10 I 11 12 7 l/ ",. STAGING PAD ' /- MILNE PO] NT UNIT I ,~M A~5 14 13 I~pLAClD BEECHEY POINT 1 Rt-IE-- 10-30-79 10-28-81 A,t~L AIi~L 23 047439 315846 BPX .19 BPX · ", BPX AB¢O f/'\, · '5.00 BPX 25~00. AFi~O I 10 102-0; A~L3' 75'.'o'o ..... B :. 25~@0 'A-Fi 24 50.00 ---Tt3N: 1~2-0.1 ADL385200 BPX ::50.00 Rt2E ........... 202-01-0~ A'D L3 85199 BPX ?5.00 O~¥US.A AILACO 25~¢0 AI~:;O: 25~¢0 ABCO 25~00 i+K-01i/O EXXON:: 25.00 EXXONi 25.00 , -~ ADL0::::'8233 ADL0:28234 AD'L385201 2: PH - --+"~-37 v E- - 50.00 CHEVRON 50.00 5e.oo 2¢9-3.D-79~2 ADL0,~7447 T~ 3 ,.,..BPX 150.00 BPX 50.00....:':';BPX 66.67 AE1COi 25~00 AR~CO 25~00,, A ,P,P~,,,~ 33.8: Exxon 25.00 EXXON 25.00 ~, K-30/D+ , , ' :--'% 5~ 71--- :+-~4o/o'a~al ........ ' ........................... , ,, l ADL028253 ADL38519 ~910-3 -7~ ,7446 ON 5 ¢.°,c¢ ( AK f~.OC L-:,-:: ....... ARCO:: 50.00 E ,~;~,,~ oN 5~.E)o ARCO NW : EILEEN 1 , ,, ¢to ,~-y Q A MOBIL AK 66. PHtb. LIPS 3-~.: 2309-~t0-7~' ADL0~744 ARco 50.00 /~~~~(~ NITAF~CO~ 50.00 MOBIL AK ,.50 E)f,r:XON 5Q~O0 E~XON 5~001 E:~,'ON[ 5~061]:~~L1~S MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johnston.~;~ DATE: Chairman / THRU: Blair Wondzell,'~.,,/~L?~'% FILE NO: P. !. Superviso¢~ December 21, 1996 EWQKLUDD.doc FROM: Chuck Scheve, (- .5 SUBJECT: Petroleum Inspector Diverter Inspection Nabors 27E MPU K-06 PTD 96-191 Saturday December 21, 1996: I traveled to BPX's MPU well K - 06 and witnessed the function test of the diverter system. The system was installed properly and caution/warning signs were in'tailed at the ends of the 10" vent lines. The lines were secured and the divert valves were full opening and operational. This is the first well for rig 27E after being reconfigured. The equipment appeared to be in working order but in serious need of paint and house keeping. Lighting on the Rig Floor and in the cellar area was poor at best. These items were pointed out to the BPX Rep. the Toolpusher and the BPX safety team which was doing an inspection at the time. Summary: I inspected the diverter system on Nabors rig 27E drilling BPX's MPU well K-06 Attachment: EWQKLUDD.XLS X Unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report D ate: 12/21196 Operation: Development X Exploratory: Drlg Contractor: NABORS DRILLING Rig No. 22E PTD # 96-191 Rig Ph. # 659-6475 Operator: B.P. EXPLORATION Oper. Rep.: Jimmy Pyron Well Name: K-6 Rig Rep.: Bdan Busby Location: Sec. 3 T. 12N R. 11E Merdian UM MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: YES Systems Pressure: 3000 psig Housekeeping: OK (Gen.) Ddg. Rig: OK Pressure After Closure: 1700 psig Reserve Pit: N/A Flare Pit: N/A 200 psi Attained After Closure: 0 min. 22 sec. Systems Pressure Attained: 1 min. 50 sec. Nitrogen Bottles: (8) BO'I-rLES DIVERTER SYSTEM INSPECTION: Diverter Size: 20 Divert Valve(s) Full Opening: YES Valve(s) Auto & Simultaneous: YES Vent Line(s) Size: 10 Vent Line(s) Length: Line(s) Bifurcated: YES Line(s) Down Wind: YES Line(s) Anchored: YES Tums Targeted / Long Radius: N/A 130~30 ff. in. 2200 Ave. psig MUD SYSTEM INSPECTION: Light Alarm in. Trip Tank: OK OK Mud Pits: OK OK Flow Monitor: OK OK Light Alarm OK OK N/T N/T GAS DETECTORS: Methane Hydrogen Sulfide: Normally Access Road Prevailing Wind ~ Open ~ Closed ~ ! ~_~2) Manually Actuated /~/ ...... ~l~f ~,~l_~_Mechanically Linked Knife Valves '~oNorth // Mud Pallet Anchors -~---~ ~'' ~ 10" Dia. Vent Line 130' ( ~_~KnEe Valve, Opens When Hydrill Closes 20"'l=rydrill ~ J Non Compliance Items Remarks: 0 Repair Items Within N/A Day (s) And contact the Inspector @ 659-3607 [Nstfibution orig. - Well File c - Database c - Tdp Rpt File c- Inspector AOGCC REP.: EWQKLUDD.XLS Chuck Scheve FI-022 (Rev. 7193) 1 ST LOG: FULL FORMAT COLOR 103196 - XPI: 08-93 01/08/97 11:17:03 DEPTH UNIT-FEET COMMENT: NONE o. 2 oEWR MW~ o. 20EWR MW]~ ss - 100 ..... DEPTH MD o. 2 oEWR MW~ 1.65RHOB ~ 0 GRIMM M~ DEPTH .I~.,$~,~.~1~,: ~ 60 NPHI ~ '455O - 600 --5450 --5500 650 --5550 i --5600 '4700 --5650 --5700 --5750 --5800 TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 December 6, 1996 Tim Schofield, Senior Drilling Engineer BP Exploration (Alaska) Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit MPK-06 BP Exploration (Alaska) Inc. Permit No. 96-191 Surf Loc 37732qSL, 203 i'WEL, Sec 3, T12N, R11E, UM Btmhole Loc 37672qSL, 499YWEL, Sec 34, T13N, R11E, UM Dear Mr Schofield: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. ~ h¥~i~rnaRD E Rf~OF )OM iMISSION ~ dlf/encl c: Dept ofFish & Game, Habitat Section - ~v/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 I la. Type of work [] Drill [] Redrill 11b. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 12. Name of Operator 15. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RTE = 60.9' Milne Point Unit / Kuparuk River 3. Address 6. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028232 ........ 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3773' NSL, 2031' WEL, SEC. 3, T12N, R11E Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 3555' NSL, 5107' WEL, SEC. 34, T13N, R11E MPK-06 At total depth 9. Approximate spud date Amount $200,000.00 3767' NSL, 4993' WEL, SEC. 34, T13N, R11E 12/08/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 375132, 3767'I No Close Approach 2560 10233' MD / 7317' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e) (2)} Kick Off Depth 300' Maximum Hole Angle 58.7° Maximum surface 2986 psig, At total depth (TVD) 7110' / 3697 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) ........ 12-1/4" 9-5/8" 40# L-80 Btrc 3731' 31' 31' 3761' 3561' 941 sx PF'E', 703 sx'G', 50 sx PF'E' , 8-1/2" 7" 26# L-80 Btrc 10203' 30' 30' 10233' 7317' 212 sx Class 'G' ...... ...... 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production RECEIVED Liner O£C 0 996 Perforation depth: measured AlsskP-- 0il & Gas C0ris. C Anc~,0m. ge true vertical ....... 20. Attachments [] Filing Fee . [] Property Plat [] BOP Sketch [] Diverter Sketch [] Ddlling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Lance Spencer, 564-5042 Prepared By Name/Number: Kathy Campoamor, 564-5122 ::;:1. I hereby certify that ~regoing !s ~ue~_~ n( iorrect to the best of my knowledge /~'~ Signed 7'~ ,,...~ ~lr/~.~.~., Tim Schofield ' i i Title Senior Drilling Engineer Date I ~/~ Commission Use Only Permit Number J APl Number J Appr, ova, I Date I See cover,otter e~.-_~..-/c~// 50-0~...'~ ~ ~ ~ ~-~--~' ...~- Jc~/ia/~/a for other requirements Conditions of Approval: Samples Required [] Yes ~No Mud Log Required [] Yes ~No Hydrogen Sulfide Measures .~es [] No Directional Survey Required ~ Yes [] No Required Working Pressure for DOPE [] 2M; []3M; j~ 5M; [] 10M; [] 15M Other: by order of Approved By~,_0riginat. ._ Signed By Commissioner the commission Date Form 10-401 Rev. 12-01-85 Davia tm. Johnstor, plicate Shared 5 6 4- 5 0 4 2 Services Drilling Contact: Lance Spencer I Well Name: IMP K-6 Well Plan Summary IType °f Well (pr°ducer °rinjector)- IKuparuk Pr°ducer I Surface Location: 3773 NSL 2031 WEL Sec 03 T12N RllE UM., AK Schrader Target 112 NSL1690WELSec33T13N R11E UM.,AK Location: Kuparuk Target 3555 NSL 5107 WEL Sec 34 '1'13N R11E UM., AK Location: Bottom Hole 3767 NSL 4993 WEL Sec 34 T13N RllE UM., AK Location: I AFE Number: 1337022 I I Rig: I Nabors 27-E IEstimated Start I 8 Dec 96 I IOperating days t°Date: complete: 12 IWell Design (conventional, slimhole, I Milne Point Ultra Slimh,,ole Longstring 9- etc.)' 15/8", 40# Surface × 7, 26# Longstring Formation Markers: Formation Tops MD TVD (bkb) Base Permafrost 1,863 1,861 8.3 ppg, 803 psi Schrader Target 5,2 0 6 4,5 31 8.3 ppg, 1956 psi NA 5,273 4,566 8.3 ppg, 19711 psi ~ 5,553 4,71 1 8.3 ppg, 2033 psi CB 5,678 4,766 8.3 ppg, 2061 psi Base OB 5,726 4,8 01 8.3 ppg, 2072 psi Top HRZ 8,873 6,436 8.6 ppg, 2878 psi Base HRZ 9,229 6,621 8.6 ppg, 2961 psi TKLB 9,348 6,686 10 ppg, 2990 psi TKUP/UD 9,584 6,831 10 ppg, 3552 psi TKUC 9,780 6,971 10.0 ppg, 3625 psi TKC1/TARGET 9,859 7,031 10.0 ppg, 3656 psi TKUB/B8 9,918 7,076 10.0 ppg, 3679 psi t~r..~L.~ ~ '--- TKB7 9,944 7,096 10.0 ppg, 3690 psi Total Depth _+ 10,233 7,317 10.0 ppg, 3805 psi T')E.C 0 ?- ,,~k~ Oil & Gas, [;o~s. Casinq/Tubing Pro!lram: Hol; (~sg/ 'Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 24" 20" 91.1# H-40 Weld 80 32/32 112/112 12 1/4" 9-5/8" 40# L-80 btrc 3731 31/31 3761/3561 8-1/2" 7" 26# L-80 btrc 10203 30/30 10233/7317 The internal yield pressure of the 7" 26# casing is 7240 psi. The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the B7 sand at + 7110 TVDSS In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of +7110 TVDSS. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 3697 psi is 2986 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: Open Hole Logs: Surface MWD Directional surface to TD. Intermediate N/A Final Cased Hole Logs: MWD Directional and LWD (GR/CDR/CDN). N/A Mudloggers are NOT required for this well. Mud Program: Special design considerations Special attention should be given to gravel, clay, hydrate, and coal intervals in the surface hole. Running gravel, sticky clays below the permafrost, gas gut mud due to hydrate formation, excessive fill on connections, tight coal sections and stuck pipe have been encountered in previous surface holes on K-Pad. Prior to spudding a complete review of the K-Pad drilling hazards is required. Preventative measures such as more frequent short trips, viscosity and mud weight control, Iow mud temperatures, controlled drilling rates, and lower flow rates should be employed to mitigate ~roblems and lost time in the surface hole. HYDRATES Hydrates are present on K-Pad and will cause problems but these can be managed if the proper precautions are taken in advance. The mud weight should be at 10.2-10.5 ppg by 2000 feet and if necessary weighted up in 0.5 ppg increments as required. Use the coldest available mix water. If possible keep mud at or below 60° F to minimize warming effects and the resulting gas liberation while drilling this interval. Controlling the flow rates between 450-600 gpm may also be required. However, with the lower flow rates need to minimize hydrate formation particular attention should be given to problems associated with hole cleaning - tight connections and fill. Downhole motors will be selected with this flow restriction in mind (8" or 7-3/4" motors are recommended). In addition controlling the drilling rate to 100 feet per hour as well as maintaining the mud viscosity at 200 sec/qt has minimized the potential problems which can occur while drilling hydrate formations. Mud treatments with DrilTreat(lecithin). Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 100 15 8 10 9 8 to to to to to to to 10.5 50 35 15 30 10 15 Intermediate Mud Properties: N/A I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Production Mud Properties: I LSNDfreshwatermud Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 40 10 3 7 8.5 6-8 to to to to to to to 11.0 50 15 10 20 9.5 4-5 Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: KOP: 300' Maximum Hole Angle: 58.7° Close Approach Well: (No Shut Ins) Disposal: Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. 1. The base of the Permafrost for all wells located in the Milne Point Unit is +1,850' TVD. Aquifers in the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project area. 2. There are +10 wells on Milne Pt. 'K' Pad. There may be additional unidentified wells within one quarter mile distance from the subject well. There are no domestic or industrial water use wells located within one mile of the project area. 3. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES". The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. . . . . . MP K-6(Kup) Proposed Summary of Operations Review Pre-Spud Checklist RP-Surface Hole VI.0 pages 1-3. prior to spud. Drill and Set 20" Conductor. Weld an FMC landing ring for an FMC Gen 5A Wellhead on conductor as well as a nipple to aid in performing potential wellhead stability cement job. Prepare location for rig move. MIRU Nabors 22E drilling rig. NU and test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is approved by an AOGCC supervisor. Build Spud Mud. Drill a 12-1/4" surface hole as per directional plan. Advise Rig Team to proceed with Extreme Caution prior to and while drilling the hydrate interval. Run Directional MWD from surface to 12-1/4" TD. . . . . 10. 11. 12. 13. 14. 15. 16. 17. 18. Run 9-5/8" casing. Space out ES Type H Cementer to 1300'. Perform Two Stage cement. Complete the surface casing cementing check list. ND 20" Diverter, NU and Test 13-5/8" BOP MU a PDC bit on an extended power section medium speed motor, with Directional MWD and LWD CDR/CDN (GR/RES/Dens/Neu). RIH, Drill out Float Equipment and 20' of new formation. Perform Leak Off Test as per Revised Recommended Practices Manual. Record pressure versus cumulative volume for LOT test for the well file. Drill 8.5" hole to TD as per directional plan. Sufficient footage should be drilled to provide 150' of production rat hole between the base of the Kuparuk B sand and PBTD is required before running the 7" casing. Run and Cement 7" Casing. Insure that a short joint is run in the 7" casing approximately three joints above the top of the Kuparuk. Displace cement with 8.4 ppg source water and enough diesel to cover from the base of permafrost to surface (+-2100' MD). Test casing to 3000 psig. ND BOPE and 11" drilling spool NU tubing spool and dry hole tree and Test Tree. RDMO Nabors 27E. Review Recommended Practice for Running Tubing Std Tbg Rng V3.2 Review Milne Point Unit ESP Running Recommended Practice RP: Run ESP/PKR: DBR/JDP -5-26/94 Version 0.0 MIRU Nabors 4ES. ND dry hole tree, NU & Test BOPE to 5000 psig. PU and RIH with clean out assembly on 2-7/8" tubing. Cleanout to PBTD. Displace hole with 10.4 ppg kill weight brine. PU and RIH with perforating guns on electric line ( The perforating procedure will be distributed later with the selected perforation intervals once they are determined). POOH with perforating guns on E-line. PU and RIH with 2-7/8" EUE 8RD tubing with GC 4100 Electric Submersible Pump (ESP) Completion.. Set 2 way check. ND BOPE and test tree. Pull two way check, freeze protect, set BPV, close valves. Test tree 1 9. RDMO Nabors 4ES completion rig. DRILLING HAZARDS AND RISKS: HYDRATES K-02, K-05, K-17, K-25, K-38, K-39 and encountered hydrates while drilling the surface hole. Mud treatments with Lecithin while drilling K-13, K-30 and K-34 may have minimized the adverse effects of hydrates but it's use is still not proven so its use should be carefully monitored. In spite of the apparent success's of the Lecithin treatments extreme caution is still advised. Severely gas cut mud, excessive connection gas, flow on connections and other problems can occur while during the surface hole on K-Pad and are directly attributed to gas hydrates. In addition problems can develop as a result of measures designed to lessen to effects gas. It is important to recognize what problems might develop while fighting gas hydrates and have plans in place to minimize them. Plans should be made in advance prior to spudding the surface hole to mitigate to potential risks and minimize the nonproductive time involved in managing hydrates. The measures are necessary to lessen to effects of gas hydrates: 1. Increased mud weights 2. Low drilling fluid temperatures 3. Reduced ROP's for control drill rates 4. Controlled circulating and drilling fluid rates 5. Utilization of Lecithin Close Approaches There are no close approaches associated with the drilling of MP K-30 however tolerance lines should be carefully monitored and deviations from the proposed wellpath minimized.. Water Injection Currently no water injection wells are present on MP K-Pad Annular Injection Currently annular injection is not permitted on K- Pad in MP K-02, MP K-05, MP K- 17, MP K-25, MP K-38, MP K-39. Cascade# 1, or Cascade #la. K-13, K-30 and K-34 Annular injection is not allowed in MP K-02, MP K-05, MP K-17, MP K-25, MP K-38, MP K- 39 because the qualifying criteria as per SSD SOP:Annulus Injection ver 4.0 June 5, 1996 pg 1 3 are not satisfied. A total of 19,608 bbls were injected into the K-17 annulus. Gas Injection No gas injection wells are present on K-Pad Lost Circulation: Lost circulation has been most prevalent while running casing and cementing in the surface as well as production hole. Losses are extremely probable while cementing the long string in wells with shallow set surface casing. K-05 experienced lost circulation while drilling the 12-1/4" surface hole at 2250 Md. K-02 , K-05 experienced losses while circulating to condition mud while running 7" csg K-05 experienced lost circulation while cementing 7" csg. In every instance losses were minimized by reducing flow rate and conditioning the mud. Stuck Pipe Potential: Running gravel's (K-17, K-38), sticky clays (K-02, K-05, K-38, K-39) and coal sections (K- 17) presented tight hole and bridging in (K-17, K-25, K-38),and stuck pipe (K-17 ) while drilling the 12 1-4" surface hole. Excessive amounts of reaming were required wile drilling K- 17 and K-25). While running 9-5/8" casing the flowing problems experienced: K-05, hole packing off, tight hole and bridging K-2, K-39. The 9-5/8" casing was stuck in K-05. These problems in some instances were greatly exaggerated because of measures taken to manage the gas hydrate problems. Increased torque and drag have been experienced after drilling into Kuparuk so care should be taken to avoid the stuck pipe potential while drilling the 8 1/2" production interval. While drilling K-34 (deep set surface) additional time was spent reaming and conditioning the hole prior to cementing because of tight hole. Formation Pressure: KUPARUKSAND 7000' TVD 3600 PSI 9.9 PPG EMW The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the B7 sand at _ 7110 TVDSS In this instance, this worst case surface pressure would occur with a full column of gas from the reservoir from a depth of _+7110 TVDSS. The maximum anticipated surface pressure in this case assuming a reservoir pressure of 3705 psi is 2986 psi, The maximum expected pore pressure for this well is 10.0 ppg EMW (3,697 psi @ 7,125' TVDss). There has been injection in this region from MP K-17, however the reservoir pressure is not expected to exceed this estimate. See the updated Milne Point K-Pad Data Sheet prepared by Pete Van Dusen for information on K pad and review recent wells drilled on K Pad. MP K-6(Kuparuk) 9-5/8" SURFACE CASING CEMENT PROGRAM - HALLIBURTON TWO STAGE CEMENT JOB - ES Cementer @ 1300' MD CASING SIZE: 9-5/8" CIRC. TEMP 60 deg F at 2840' TVDSS. SPACER: 70 bbls NSCI Spacer weighted to current mud weight plus 1 ppg equivalent mud weight FIRST STAGE (Lead and Tail slurry are pumped in the first stage) LEAD CEMENTTYPE: Type E Permafrost ADDITIVES: 0.15 Ib/sk Flocele WEIGHT: APPROX NO SACKS: 12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk 2 8 4 THICKENING TIME: Greater than 4 hrs at 50° F. TAIL CEMENT TYPE: Premium G ADDITIVES: 2.0% CaCI2 +.15#/SK FLOCELE "Cello-Flakes" WEIGHT: APPROX #SACKS: 15.8 ppg YIELD:l.15 ft3/sx MIX WATER' 4.90 gal/sk 7 0 3 THICKENING TIME: Greater than 4 hrs at 50° F. The estimated first stage lead cement volume is equivalent to the annular volume calculated from the base Permafrost to the ES Cementer located at 1300' md +250% EXCESS. The estimated first stage tail cement volume is equivalent to the annular volume calculated from total depth to a depth to the base of the Permafrost + 30% Excess + shoe joint volume. SECOND STAGE The objective of the Second Stage of the cement program is to make sure cement is circulated to surface. Preparations should be made to continue pumping cement until such time as cement returns are observed at the surface. This volume will likely exceed the annular capacity and the 250% estimated excess. Additional cement should be on hand before the job starts so excess volume should be ordered. The estimated second stage lead cement volume is equivalent to the annular volume calculated from surface to the ES Cementer located at 1300' md + 250% EXCESS. LEAD CEMENTTYPE: Type E Permafrost ADDITIVES: 0.15 Ib/sk FIocele WEIGHT: APPROX NO SACKS: 12.0 ppg 657 YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. WELLHEAD STABILITY CEMENT TYPE: Permafrost E NOTE: The WELLHEAD STABILITY CEMENT WILL BE PUMPED IF THE CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN. ADDITIVES: None WEIGHT: 12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX NO SACKS: 50 RECIPROCATION of the CASING STRING is required WHILE CEMENTING. CENTRALIZER PLACEMENT: 1. Install one(l) Straight Blade TURBULATOR Centralizers per joint of 9-5/8" casing on bottom 10 joints of casing (required). 2. Install one(l) Straight Blade TURBULATOR Centralizers per joint of 9-5/8" casing on from 2000-2500 feet joints of casing (required).Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 - 15 bpm. Mix slurry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The estimated first stage lead cement volume is equivalent to the annular volume calculated from the Base Permafrost to the ES Cementer located at 1300' md +250% EXCESS. 2. The estimated first stage tail cement volume is equivalent to the annular volume calculated from TD to the base of the Permafrost + 30% Excess + shoe joint volume. 3. The estimated second stage lead cement volume is equivalent to the annular volume calculated from surface to the ES Cementer located at 1300' md + 250% EXCESS. 4. Capacity of 80'md 9-5/8", 40#casing for float joints. 5. Wellhead stability Cement Volume is 150 sacks. It will be pumped if necessary to provide support to the wellhead. MP K-6(Kuparuk) Well 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON This cement program is proposed only if the Schrader Bluff formations are NOT hydrocarbon bearing. In the event the Schrader Bluff formations proves to be hydrocarbon bearing a supplemental cement program will be submitted. Single STAGE CEMENT JOB across the KUPARUK: CIRC. TEMP: 115° F BHST 120° F at 7040' TVDSS. SPACER: 20 bbls fresh water 70 bbls NSCI Spacer mixed as per Halliburton specifications CEMENT TYPE: Premium G ADDITIVES: WEIGHT: 15.80 ppg APPROX # SACKS: 0.2% CFR-3, 0.45% Halad 344, 0.1% HR-5 YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk 212 SACKS THICKENING TIME: 4 1/2 hrs @ 140° F FLUID LOSS: +/- 50cc/30 min @ 140° FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: Run two the 7" x 8-1/4" Straight Blade Rigid Centralizers. per joint on the from TD to 300' above the Kuparuk C. This job will require 33 7" x 8-1/4" Straight Blade Rigid Centralizers. Run one (1) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing shoe Only if Schrader hydrocarbon bearing. Run one the 7"x 8-1/4" Turbulators per joint 300' above and 300' below the Schrader Bluff approximately 5605-6613' md (25 Turbulators). OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 10 bpm. Batch mixing is not necessary, Cement shall be displace above the top of the Schrader Bluff however this well is not a planned injection well therefore a Cement Bond Log is not required. CEMENT VOLUME: , Single stage cement volume is calculated to cover1000 FT MD above the Kuparuk C Top + 30% excess. Anadrill Schlumkerger Alaska District llll East 80th Avenue AnChorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : MPK-06(P7) Field ........ : MILNE POINT KPAD Computation..: Minimum Curvature Units ........ : FEET Surface Lat..: 70.42606857 N Surface Lon~.: 149.31121271 W Legal Description Surface ...... : 3?72 FSL 2031 FEL SCHRADER TGT : 112 FSL 1690 FEL KUPARUK TGT : 3555 FSL' 5107 FEL BHL .......... : 3767 FSL 4993 FEL LOCATIONS - ALASKA Zone: 4 X-Coord ¥-Coord S03 T12N RllE UMV/ 584523.40 6005908.20 S33 T13N RIlE UM 585377.00 6007538.00 S34 T13N RIlE DM ~-587192.00 6011002.00 S34 T13N Rile UM 587303.57 6011214.93 PROPOSED WELL PROFILE Prepared ..... : 26 Nov 1996 Vert sect az.: 28.30 KB elevaSion.: 60.90 ft Magnetic Dcln: ,28.293 (E) Scale Factor.: 0.99990812 Convergence..: +0.64898577 FO/? STUDY.ONLY 0 < © ==================== STATION IDENTIFICATION KB KOP/BUILD 1.5/100 CURVE 1.48/100 DROP 1.5/100 MEASURED INCLN DEPTH ;iNGLE =====:=== DIRECTION VERTICAL-DEPTHS AZIMUTH ~n;D SUB-SEA 0.00 0.00 0.00 0.00 -60.90 300.00 0.00 0.00 300.00 239.10 400.00 1.50 56.'31 399.99 339~09 500.00 3.00 56.31 499.91 439.01 600.00 4.50 56.31 599.69 538.79 SECTION COORDINATES-FROM ALASF~A Zone 4 TOOL DL/ DEPART Wellhead x Y FACE 100 0.00 0.00 N 0.00 E 584523.40 6005908.20 HS 0.00 0.00 0.00 N 0.00 E 584523.40 6005908.20 56R 0.00 1.16 0.73 N 1.09 E 584524.48 6005908.94 56R 1.50 4.62 2.90 N 4.36 E 584527.72 6005911.15 56R 1.50 10.40 6.53 N 9.80 E 584533.12 6005914.84 56R 1.50 700.00 6.00 56.31 699.27 . 638.37 18.47 11.61 N 17.41 E 800.00 5.82 42.04 798.74 737.84 28.01 18.27 N 25.15 E 900.00 6.00 27.76 898.22 837.32 38.16 26.66 N 30.98 E 1000.00 4.50 27.76 997.80 936.90 47.31 34.75 N 35.24 E 1100.00 3,00 27.76 1097.58 i036.68 5~.85 40.54 N 38.29 E 584540.68 6005920.00 104L 1.50 584548.34 6005926.75 90L 1.48 584554.07 6005935.20 LS 1.48 584558.24 6005943.35 28R 1.50 584561.22 6005949.17 28R 1.50 1200,00 1.50 27.76 1197.50 1136.60 57.77 4.4.02 N 40.12 E 584563.01 6005952.66 ~S 1.50 (Anadrill (c)96 MPK6P7 3.0b.08 3:14 PM P) STATION MEASURED INCLN IDENTIFICATION DEPTH ANGLE END 1,5/100 DROP 1300.00 0.00 BASE PERMAFROST 1863,41 0.00 BUILD 2.5/100 1900.00 0.00 · 2000.00 2.50 2100.00 5.00 L~ND 2.5/100 BUILD 9-5/8" CASING POrNT BUILD 2.5/100 PROPOSED WELL. PROFILE DIRECTION VERTICAL-DEPTHS 'AZIMUTH TVD SUB-SEA 0.00 1297.49 1236.59 0.00 1860.90 1800.00 0.00 1897.49 1836.59 27.76 1997.46 1936.56 27.76 2097.23 2036.33 2200.00 7.50 2300.00 10.00 2400.00 12.50 2500,00 15.00 2600,00 17.50 2700.00 2800.00 2900.00 3000.00 3100.00 20.00 ,27.76 2196.63 2135,73 27.76 2295.46 2234.56 27.76 2393.53 2332.'63 27.76 2490.66 2429.7.6 27.76 2586.65 2525.75 . 27.76 2681.34 2620,44 2774.53 2713.63' 2866.06 2805.16 2955.74 2894.84 3043.40 2982.50 , , 22 50 27.76 25.00 27.76 27.50 27.76 30.00 27.'76 3200.00 32.50 3300.00 35,00 3400.00 37.50 .3500.00 40.00 3600.00 42 .50 SECTION DEPART 59.08 59.06 59.08 61.26 67.80 3700.00 45.00 3707.78 45.19 3760.78 45.19 4665,58 45.19 4700.00 46.05 78,69 93.90 113.41 137.17 165.~5 4800.00 48.55 4900.00 51.05 5000.00 53.55 197.29 233.53 273,80 318.02 366,12 27.76 3128.89 3067.99 417.99 27.76 3212.03 3151.13 473.54 27.76 3292.67 3231.77 532,66 27.76 3370,65 3309.75 595.25 27.76 3445.83 3384.93 661.17 27.76 3518.06 3457.16 730.31 27.76 3523~54 3462.64 735.82 27.76 3560.90 3500.00 773.43 27.76 4198.51 4137.61 1415.36 27.80 4222.59 4161.69 1439.96 27.91 4290.39 4229.49 1513.44 28.02 4354.93 4294.03 1589.82 28.12 4416.08 4355.18 1668.93 COORDINATES-FROM ALASKA Zone 4 Wellhead X Y 45.17 N 40.73 E 584563.61 6005953.83 45.17 N 40.73 E 584563,61 6005953.83 45,17 N 40.73 E 584563.61 6005953.83 47.10 N 41.74 E 584564.60 6005955.77 52.89 N 44.79 E 584567.58 6005961.59 T_=UDY ONLY TOOL DL/ FACE 100 HS 1.50 ~S 0.00 28R 0.00 28R 2,50 HS 2.50 62.52 N 49.86 E 584572.54 6005971.28 HS 2.50 75.99 N 56.94 E 584579.47 6005984.82 HS 2.50 93.25 N 66.03 E 584588.36 6006002.18 HS 2.50 114.28 N 77.10 E 584599.19 6006023,34 HS 2.50 139.04 N 90.13 E 584611.94 6006048.24 HS 2,50 167.49 N 105.09 E 584626.58 6006076.85 HS 2.50 199.56 N 121.97 E 584643.09 6006109.11 ~S 2.50 235.19 N 140.73 E 584661.44 6006144.95 HS 2.50 274.'33 N 161.32 E 584681.59 6006184'.31 HS 2.50 316.89 N 183.72 E 584703.50 6006227.12 HS 2.50 362.80 N 207.88 E 584727.14 6006273.29 HS 2.50 411.96 N 233.75 E 584752.45 6006322.74 HS 2.50 464.28 N 261.29 E 584779.39 6006375.37 HS 2.50 519.67 N 290.43 E 584807.90 6006431.07 HS 2.50 578.01 N 321.14 E 584837.94 6006489.76 HS 2.50 639.20 N 644.07 N 677.35 N 1245.45 N 1267~21 N 1332.19 N 1399.64 N 1469.46 N 353.3{ E 584869.44 6006551.30 355.90 E 584871.95 6006556.20 373.42 E 584889.09 6006589.68 672.38 E 585181.57 6007161.07 683.85 E 585192.79 6007182.96 HS 2.50 HS 2.50 HS 0.00 2R 0.00 2R 2.50 718.19 E 585226.39 6007248.31 2R 2.50 754.00 E 585261.43 6007316.17 2R 2.50 791.23 E 585297.86 6007386.39 2R 2.50 0 < O (Anadrill (c)96 MPK6P7 3'0b.08 3:14 PM P) STATION IDENTIFICATION · END 2.5/100 BUILD SCHRADER TARGET NA os BASE OB THRZ B~RZ DROP 3.25/100 END 3,25/100 DROP DROP 3.5/100 TKLB TKUP/UD MEASURED DEPTH 5100.00 5200.00 5206.08 5206.08 5273.45 5552.55 5677,67 5725.79 8872.93 9229.03 9229.03 9300.00 9304.52 S344.63 9348.45 9400.00 ~500.00 '~584.11 9600.00 9700.00 PROPOSED WELL PROFILE INCLN ANGLE 56,05 58.55 58.70 58.70 58.~0 DIRECTION VERTICAL-DEPT~S AZIMUTH TVD SUB-SEA mmm~m{Nmm :zm::::= :=:===:= 28.21 4473.71 4412.81 28,30 4527.74 4466.84 28.30 4530.90 4470.00 28,30 4530.90 4470.00 28.30 4565.90 4S05.00 58.70 28.30 4710.90 4650.00 58.,70 28.30 4775.90 4715.00 58.70 28.30 4800.90 4740.00 58.70 28.30 6435.90 6375.00 58.70 28.30 6620.90 6560.00 SECTION DEPART 1750.64 1834.79 1839.97 1839.97 1897.54 58.70 28.30 6620.90 6560.00 56.39 28.30 6658.98 6598.08 56.25 28.30 6661.49 6600.59 56.25 28.30 6683.78 6622.88 56.11 28,30 6685.90 6625.00 54.31 28.30 6715.31 6654.41 50,81 28.30 6776.10 6715.20 47.86 28.30 6830.90 6770.00 47.31 28.30 6841,62 6780.72 43.81 28.30 6911.62 6850.72 TKUC 9780.28 41.00 28,30 6970.90 6910.00 9800.00 40.31 28.30 6985.86 6924.96 END 3.5/100 DROP 9808.82 40.00 28.30 6992.60 6931.70 KUPA-RUK TARGET 9858.82 40.00 28.30 7030.90 6970.00 TKC1 9858.82 40.00 28.30 7030.90 6970.00 TKUB/B8 9917.56 40.00 28.30 7075.90 7015.00 TKB7 9943.67 40.00 28.30 7095.90 7035.00 TKB6 9982.83 40.00 28.30 7125.90 7065.00 2136.02 2242.93 2284~05 4973.15 5277.42 5277.42 5337.30 5341.06 5314.42 5377.59 5419.92 5499.31 5563.10 5574.83 5646.22 5700.35 5713,20 5718.89 5751.02 5751.02 5788,78 5805.57 5830.74 ===================== =====_ COORDINATES-FROM ALASKA Zone 4 Welihead X Y FACE 100 1541.49 N 829.80 E 585335.61 6007458.85 2R 2.50 1615.61 N 869.63 E 5853?4.59 6007533.41 2R 2.50 1620.18 N 872.09 E 585377.00 600753'8.00 HS 2.50 1620.18 N 872.09 E 585377.00 6007538.00 HS 2.50 1670.86 N 899.38 E 585403.71 6007588.99 HS 0.00 FOI STUDY TOOL DL/ 1880.83 N 1012,45 E 585514.39 6007800.21 HS 0.00 1974.96 N 1063.13 E 585564,00 6007894.89 HS 0.00 2011,16 N 1082.63 E 585583.08 6007931.31 NS 0.00 4378.82 N .2357.57 E 586831.01 6010313,0~ HS 0.00 4646.72 N 2501.83 E 586972.21 6010582,53 LS 0.00 4646.72 N 2501.83 E 586972.21 6010582.53 LS 0.00 4699~4~ N 2530.23 E 587000.00 6010635.57 LS 3.25 4702.76 N 2532.01 E 587001.75 6010638.90 HS 3.25 4732.12 N 2547.82 E 587017.23 6010668.44 LS 0.00 4734.91 N 2549.32 E ·587018.70 6010671,25 LS 3.50 4772.19 N 2569.40 E 587038.35 6010708.74 LS 3.50 ~842.08 N 2607.03 E 587075.19 6010779.06 LS 3.50 4898.25 N 2637.28 E 587104.79 6010835.56 LS 3.50 4908.58 N 2642.84 E 587110.24 6010845.95 LS 3.50 4971.43 N 2676.69 E 587143'.36 6010909.17 LS 3.50 5019.10 N 2702.35 E 587168.49 6010957.12 LS 3.50 5030.40 N 2708.44 E 587174.45 6010968.50 LS 3.50 5035.41 N 2711.14 E 587177.09 6010973.53 HS 3.50 5063.71 N 2726.38 E 587192.00 6011002.00 MS 0.00 5063.71 N 2726.38 E 587192.00 6011002.00 HS 0.00 5996.96 N 2744.28 E 587209,52 6011035.44 HS 0.00 5111.73 N 2752.24 E 587217.31 6011050.31 HS 0.00 5133~90 N 2764.17 E 587228.99 6011072.60 HS 0.00 O (Anadrill (c)96 MPK6P7 3.0b.08 3:14 PM P) STATION MEASURED IDENTIFICATION DEPTH TKB5 100S8.94 TKB4 10054.63 TKB3 16093.79 TKB2 10126.43 7" CASING POINT 10232.83 TD 10232,.83 PROPOSED WELL PROFILE INCLN DIRECTION COORDINATES-FROM ANGLE AZIMUTH Wellhead VERTICAL-DEPTHS SECTION TVD SUB-SEA DEPART 40.00 28.30 7145.90 7085.00 5847.52 5148.67 N 2772.13 E 40.00 28.30 7180.90 7120.00 5876,89 5174.53 N 2786.05 E 40.00 28.30 7210.90 7150.00 5902,06 5196.69 N 2797.99 E 40.00 28.30 7235.90 7175.00 5923,04 5215.16 N 2807.93 E 40.00 28.30 7317.41 7256.51 5991.44 5275.38 N 2840.36 E 40.00 2B.30 7317.41 7256.51 5991.44 5275.3B N 2840.36 E ALASKA Zone 4 TOOL DL/ X Y FACE 100 587236.78 6011087.47 ~S 0.00 587250.41 6011113.48 ~S 0.00 587262.09 6011135.77 ~S 0.00 587271.83 6011154.35 ~S 0.00 5B7303.57 6011214,93 0.00 5873O3.57 6011214.93 0.00 0 < O 0 '0 {Anadrill (c)96 MPK6P7 3.0b.08 3:14 PM P) ,~ov~26-96 02:23P Anal/ ?--~1 DPC 90~ ,~J4 2160 P.06 mmmmmmm .,, MPK-06 (P7) '<KB> 0 A ,-- I i VERTICAL SECTION VIEW,, 5oo-- "! ...... Section at' 28.30 C TVD Sca~e.' ~ inch : ~000 feet o~- ': Ii .. Dep Scale.' ~ inch = ~000 feet 1000 ; I Drawn. · 26 Nov ~996 I E- I 1500-- 'I ........ [ i .... I ' --I ~na~ilY ~h]u~erger .... ~-~ ~ -- -i .............. ~~uen~sf-~ Marker Identification MD BK8 SECTN INCLN 2000 I . A) KB 0 0 0 O. O0 I. B)~KOP/BUILD 1.5/~00 300 300 0 0.00 2500 ..... E) END ~.5/~00 DROP t300 t297 59 0.00 T F) BUILD 2.5/100 1900 IBg7 59 0.00 ' G) END 2.5/t00 BUILD 370B 3524 736 45~19 O) 7" CASING POINT 10233 7317 5991 40.00 ooo.. .. ~ . 5500 ................ , , 6000 ' I ' · ·. ooo 7500- - j I 8000 I ~ooo, I i J I J I 0 500 1000 t500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 Section Oeparture (~adrill [c]~ ~KfP7 3.0b.08 2:49 ~ P) ,~ov~26-96 02:23P Ana~ ~L~] DPC go~ ~.44 2160 P.07 I ", SHARED_SERa/iCES DRILL'iNG- .." - · ' I IVl~l~--tJU [I-' / ) i VERTICAL SECTION VIEW ' Section at' 28.30 , · . I TVD Sca]e.' 1 inch = ~00 feet ; _ I Dep Scale ' 1 inch : ~00 feet ) ~ . : - .I ........... ~ .... ' ......... '~,r-~.' Drawn ' 26 Nov 1996 ~ ,, ................ ~ · , ~lnadrJ ]] Schlumberger I ' 1 .... ',' fl~L~''-~ Marker Identification ND 'BKB SECTN INCLN i ~) ~0~ 3.~5/~00 ~ fifiSl 5~77 58.70 i B) ENO 3.25/~00 OROP 9305 6661 534~ 56.25 C] DROP 3.5/J00 9345 6684 5374 56.25 )--- .' - · . O] END 3.5/100 DROP 9809 6993 5719 40.00 . , ; E) .KUPARUK fARGET : 9859 703J 5751 40.00 , i F) 7" CASIN6 POINT 10233 73~7 5991 40.00 ) : ~ 6J TO 10233 7317 599~ 40.00 . ,. ~ , . I · ' .''~ I ,. ,--. ~ ................. ~ ~ ~'-- ~'~ ', [ ............................ ~ ...... ........... .__: ...... ~- ~-~ ' r~ ..... : :~ ..- --- ~.- ,.-~i .......... ~ ....... ~ ~,~- [-~ ~ i ..... t ...... ~ ............... ~ . 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 Section Depa¢tu~e (~adrilI (clg6 ~7 3.0a.08 2:53 BH pi ,Iov-26-96 02:24P Ana~'.~]31 DPC 90~'.344. 2160 P.08 -I SHA~EB Marker Identification A) KB B) C) D) E) F} G) H) I) J) K) L) N) N). o) P) o) H) KOP/BUILD ~.5/100 CURVE 1.4B/100 DROP 1.5/100 END 1.5/100 DROP BUILD 2.5/100 END 2.5/100 BUILD 9-5/8' CASING:POINT BUILD 2.5/100 END 2.5/~00 BUILD SCHRADER TARGET DROP 3.25/100 ' END 3.25/100 DROP OROP 3.5/100 END 3.5/~00 DROP KUPARUK TARGET 7' CASING PRINT TD MD 0 300 700 9OO 1300 ~go0 3708 3761 4666 5206 5206 9229 9305 9345 9809 9859 10233 ]0233 N/S ON ON ~2 N 27 4§ 45 644 677 1245 1620 1620 4047 4703 N 473;) N 5O35 N 5064 N 5275 N 5275 N : 50O 0 500 <- WES[ : EAST -> (~aUriIJ ~)g6 I. IP~6,P7 3.0b.08 2:57 PM P) SERVICES DRILLING m E/W t7 .~ 31 41E 41E 356 E 373 E 672 E 872 E 872 E 2502 E 2532 E 2548 E 271! E 2726 E 2840 E 2840 E MPK-06 (P7) PLAN VIEW i CLOSURE ' 5991 feet at Azimuth 28.30 DECLINATION · +28.293 (E) SCALE ....... : ~ inch : lO00 feet DRAWN ' 26 Nov t996 Jnadri l] Schlumberger FOR STUDY ONLY m ~. TARGET. . (Radius LO0 feet ) ' ' . . !/ ..~.. ~/!'m''~.' ' · : 'i I--- ' ........ : i --'............................ ~ . i- · 1 'ARE IA ET [Poiitt) I ' I ' ,:-' .i' ' ~o00 ~500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 .ov-:-26--96 02: 24P Anad?-'~ 11 DPC 907 344 2160 ( ,, P_09 L-rda~.~,l~ .[~z~_[~J Anadrill Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Client .............. : BP EXPLORATION Planned Well Survey Program Date Calculated ..... : I 1/26/96 15:06 Well Name ....... : MPK-06(P07) Star~ End Type Interval Date Plotted .......... : I 1/26/96 I 5:06 Field ................ : MILNE POINT 0 10233 MEWD 93 KBE ..................... : 60.90 County / State..: BEECHEY POINT, ALASKA Grid X .................. : 584523.40 APl# ................ ; 50-029-96065-00 Grid Y .................. : 6005908.20 Anadrill tD# ...... : 500299606500P0703 Grid Zone ............. : ASP ZONE 04 1 3600 90( 9600 -20 - 10 O 10 20 30 40 /50 60 70 80 90 100 NORMAL PLANE SEPARATION (1" = 20 ft) Z O. MPK-13(D01) 10232.63 1111 East 80th Avenue * Anchorage, Alaska 99518 - Telephone: (907) 349-4511 - FAX: (907) 344-2160 Jvr26--g6 02:25P AnadF ~ 11 DPC 90~*-? 344 2160 Polo AnadrJil Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Cli,,,t .............. : BP EXPLORATION Well Name ....... : MPK-O6(P07! Field ................ : MILNE POINT coumlt¥ / Slate..: BEECHEY POINT, ALASKA APl# ................ :50-029-96065-00 Anadrili I1~# ...... : 500299606500P0703 i. MIN. ' I j '; OFFSET WELL FLOWING. ELLIPSE I SURVEY ~ SAFETY I SEP. SEP. i Planned Well Survey Program Start End Type Interval O 10233 MEWD 93 MD' TVD DaTe Calculated ..... : I 1/26/96 15:06 Date Plotted .......... ; I 1/26/96 15:O7 KBE ..................... : 60.90 Grid X .................. : 584523.40 (3rid Y .................. : 6005908.20 Grid Zone ............. : ASP ZONE 04 SEP. MPK-13{DO1) ':: 12.8 MPK-02 i 6.8 MPK-30(D01} 128.3 MPK-38 i 228.4 MPK-I-I(PO1 ) : 81.1 MPK-HCP03) 81.1 MPK-T(PO1 ) i I I 1.0 MPK-05 97.9 CASCAD lA(DOll ) 918.! MPK-17 i'32,4 MPK-34(D01) ! 201.8 MPK-25(PO 1 ) 175.2 MPK-25 176.1 CASCAD£1(D01) 1163.2 MPK-S6Z(P01) ' 155.9 MPK-21 (PO3) 156.0 MPK-21(P02) i :156'2 · ; 42.5 16.5 151.6 257.7 ' 89,7 89.7 119.6 103,8 967.0 138.7 ' 210.1 182.3 183.2 1210.0 161.9 161.7 161.8 209.6 262.3 3602.5 55.4 22.8 161.0 268.4 92.8 92.8 122.7 105.9 103~-,6 141,0 213.0' 184.8 185.7 1258.6 164.0 163.6 163.8 212.1 264.4 4632.6 J 1991 1989 649j 649j 1554 1551 1948 J 1945 573 573 573 I 573 396I 396 4088 . 3792 420 420 471 471 4.69 J 469 3677i 3502 400 400 376 3761 376} 376 . 4.77 476 396 j 396 9245: 6629 ) I i 29.9 FLOWINGIP£UQeEOI ENTER ENTER ' EXIT , EXIT SAFETY SAFETY · PLUG 'i NO DRILL N° DRILLi PLUG 'DIST. j DIST.j ZONE . ZONE ZONE ZONE · MD MD MD ! MD 4.9 1.4 1.4 1.4 1.0 10.2 1.1 1.4 1.2 1.2 0.9 1.2 1.0 23.1 ! I 9.7 23.3 29,2 8.6 $.~ 7.1 7.0 46.8 6.0 5.6 7.1 81.2 NOTES: Ail depths & diet&ncaa ere in FEET Ali depths are referenced from well MPK-OS(P07) Min Flowing Safety Sep. la amount of additional clearance from flowing safet~ line. CLOSE · APPROACH ' STATUS FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW 1 I 1 I East 80th Avenue o Anchorage, Alaska 99518 - Telephone: (907) 349-451 I - FAX: (907) 344-2160 ,, WELL PERMIT CHECKLIST COMPAN FIELD & POOl INrrCL, SS /%',? WELL NAME //?/¢/~!-. ~ ~ PROGRAM: exp !:3 dev~reddl El sen/13 wellborn seg [] ann. disposal para mq [] GEOL AREA ? ,,~ ~ UNIT# ~' ./¢~-¢~ ,/¢7, ON/OFF SHORE , r'~_~,'d IMINISTRATION ENGINEERING ' G~.OLOGY ., AP. PR DATE)/. 1 1 1 1 Permit fee a~_~ed ........................ ¢~ N ¢ _.~,~, , / ,. Lease number appropriate ................... .~), N Unique wet] name and number ................. ?~N.~ Well Ioc~t~ in a defined pool .................. 1. proper distance from drlg unit boundary ..... .Y~N ' 5.6. Well 'oc=tted proper distance from other weltsWell lo=ed ......... ~?N 7. Sufficient acreage sv-aitable in drilling unit. .......... ~N .__.~., 0. Operator has appropriate bond in force ............ .~.Y~ N 1. Permit can be issued wi~out conserv~on order ....... 2. Permit can be issued wfl~out administrative approval .... ./~U /~?~,,~/ !',~ ../ ~ ~,,"..z~ --~ ~-~-.- (-"~).~'~.-/~..<', ~ //(~:t'.~ 3. Can permit be approved before 15-day waiL ........ 14. Conductors~ng provided .................. .I;~N 15. Surface casing protects all known USDWs ......... 16. CMl' vol adequste to circulate on conductor & surf csg . . . Y._.y/N_.. 17. CMT vol adequate to Qeqn tong s~ng to surf csg ...... 18. CMT will cover all known productive horizons. ........ ~N 19. Casing designs adequste for C, T, B & ~ ..... {.~ N 20. Adequate tankage or reserve piL .............. ~ N 21. If a re-drill, has a 10-403 for been approved... 22. Adequate wellbore separ~donproposed. ' N ¢ L,/,,'" 23. If diverl:er required, is it adequate ..... 24. Drilling fluid program scherr~c & equip list adequate .... ~ N 25. BOP,..s adequate .............. ¢"~:~ ..... ~ N 26. BOPE press raQng adequste; test to ~) psig. ~ N D f"- 27. Choke manifold complies w/API RP-5,3 (May 84) ....... 28. Work will occur wibhout opera, on shutdown .......... .~N 2~. Is presence of H2S gas probable ............... -/I,/N-(~,/N ................ 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N - 31. Dat~ presented on potential overpressure zones Y N' 32. Seismic a~aJysis of shallow gas zones ............. Y N 33. Seabed condilJon survey (if off-shore) ............. Y N 34. Cor~act name/phone for weekJ~Z progress repo~ .. ...... Y N jet,oratory onty] ' // GEOLOGY: ENGINEERING: COMMISSION: JDH JDN TAB Comments/Instructions: HOW~I~. A.~-OR~m my ~ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . ****************************** * ............................ . * ....... SCHLUMBERGER ....... * . ............................ . ****************************** COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : MP K-06 FIELD NAME : MILNE POINT BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22725-00 REFERENCE NO : 97151 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/04/15 ORIGIN · FLIC REEL NAME : 97151 CONTINUATION # : PREVIOUS REEL : CO~4ENT . BP EXPLORATION (ALASKA),MILNE POINT, MPK-06, API #50-029-22729-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/04/15 ORIGIN · FLIC TAPE NAME : 97151 CONTINUATION # : 1 PREVIOUS TAPE : CO~IENT · BP EXPLORATION (ALASKA),MILNE POINT, MPK-06, API #50-029-22729-00 TAPE HEADER MILNE POINT CASED HOLE WIRELINE LOGS WELL NA~E: MP K- 06 API NUMBER: 500292272500 OPERATOR: BP EXPLORATION (AL~SKA ) LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 15-APR-97 JOB NUMBER: 97151 LOGGING ENGINEER: KIRKBY OPERATOR WITNESS: ROBERTSON SURFACE LOCATION SECTION: 3 TOWNSHIP: 12N RANGE: liE FNL : FSL: 3773 FEL: 2031 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 61.54 DERRICK FLOOR: 60.54 GROUND LEVEL: 27.90 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 7. 000 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: NONE LDWG CURVE CODE: RUN NUMBER '. PASS NUMBER: DATE LOGGED: LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH THIS FILE CONTAINS THE LDWG EDIT FOR THE GR/CCL DEPTH CONTROL LOG FOR BP EXPLORATION WELL MPK-06 WELL. THIS IS THE PDC GAMMA RAY RUN ON 1-12-97 BY SWS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUI~VARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10112.0 202.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALE1TT UNSHIFTED DEPTH .......... BASELINE DEPTH $ REMARKS: THIS FILE CONTAINS THE EDITED MAIN PASS GRCH. THE CURVES WERE CLIPPED ANDNO DEPTH SHIFTING WAS PERFORMED. LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~iE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560180 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH GR GAPI 560180 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CR LB 560180 O0 000 O0 0 1 1 1 4 68 0000000000 CCL GR V 560180 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10112.000 GRCH. GR 47.631 TENS.GR 2286.000 CCL.GR DEPT. 202.000 GRCH. GR 21.851 TENS.GR 652.000 CCL.GR O. 015 -0.040 ** END OF DATA ** LIS Tape-Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE . FLIC VERSION . O01CO1 DATE · 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUR~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10092.0 9792.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... REMARKS: THIS FILE CONTAINS THE EDITED REPEAT PASS GRCH. THE CURVES WERE CLIPPED AND NO DEPTH SHIFTING WAS PERFORMED. $ LIS FORMAT DATA LIS Tape Uerification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: 5 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560180 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CR GAPI 560180 O0 000 O0 0 2 1 1 4 68 0000000000 TENS GR LB 560180 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CR V 560180 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10092.000 GRCH. GR 52.009 TENS.GR 1468.000 CCL.GR DEPT. 9792.000 GRCH. GR 70.933 TENS.GR 1659.000 CCL.GR -0.006 -0.998 ** END OF DATA ** o 15-APR-1997 12:19 PAGE: 6 LIS Tape ~erification Listing Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE ' FLIC VERSION . O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION . O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCReMENT: 0.5000 FILE SO?4MARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10121.5 197.0 GRCH $ LOG HEADER DATA DATE LOGGED: 12-JAN-97 SOFTWARE VERSION: 8BO - 538 TIME LOGGER ON BOTTOM: 1514 12-JAN-97 TD DRILLER (FT) '. 10107.0 TD LOGGER (FT) : 10098.0 TOP LOG INTERVAL (FT) : 200.0 BOTTOM LOG INTERVAL (FT) : 10093.0 LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR COLLAR LOCATOR CAL- Y 30 TCC TELEMETRY CARTRIDGE TCC-B 1287 GR GAf4MA RAY SGC-SA 271 GR GA~k4A RAY BNS- CCS $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 0.0 10107.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNTRATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: THIS FILE CONTAINS THE RAW DATA FOR MAIN PASS. RUN NUMBER 1 RIG NABORS 4ES PLUGBACK TD IS 10107 FT THIS IS THE PRIMARY DEPTH LOG. SCHLUMBERGER DEPTH IS 10098 FT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape ~$erification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: 8 TYPE REPR CODE VALUE 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560180 O0 000 O0 0 3 1 1 4 68 0000000000 GR LOG GAPI 560180 O0 000 O0 0 3 1 1 4 68 0000000000 TENS LOG LB 560180 O0 000 O0 0 3 1 1 4 68 0000000000 CCL LOG V 560180 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10121.500 GR.LOG DEPT. 197.000 GR.LOG 54. 974 TENS. LOG 1592. 000 CCL. LOG O. 015 23.689 TENS.LOG 651.000 CCL.LOG -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: **** FILE H~ER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE · 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUM~LARY VENDOR TOOL CODE START DEPTH GRCH $ LOG HEADER DATA DATE LOGGED: 10104.0 SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 9789.0 12-JAN-97 8B0-538 1514 12-JAN-97 10107.0 10098.0 200.0 10093.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR COLLAR LOCATOR CAL- Y 30 TCC TELEMETRY CARTRIDGE TCC-B 1287 GR GAMFiA RAY SGC-SA 271 GR GAMMA RAY BNS-CCS $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): 8.500 0.0 10107.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: 10 FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO .. CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) '. BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: THIS FILE CONTAINS THE RAW DATA FOR REPEAT PASS. RUN NUMBER 1 RIG NABORS 4ES PLUGBACK TD IS 10107 FT THIS IS THE PRIMARY DEPTH LOG. SCHLUMBERGER DEPTH IS 10098 FT. $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: 11 TYPE REPR CODE VALUE 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAd~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT 560180 O0 000 O0 0 4 1 1 4 68 0000000000 GR RPT GAPI 560180 O0 000 O0 0 4 1 1 4 68 0000000000 TENS RPT LB 560180 O0 000 O0 0 4 1 1 4 68 0000000000 CCL RPT V 560180 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10104.000 GR.RPT 45.582 TENS.RPT 1301.000 CCL.RPT DEPT. 9789.000 GR.RPT 70.933 TENS.RPT 1659.000 CCL.RPT 0.007 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE . FLIC VERSION · O01CO1 DATE : 97/04/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NARIE : EDIT DATE · 97/04/15 ORIGIN · FLIC TAPE NAME : 97151 CONTINUATION # : 1 PREVIOUS TAPE .. CO~4ENT : BP EXPLORATION (ALASKA),MILNE POINT, MPK-06, API #50-029-22729-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-APR-1997 12:19 PAGE: 12 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 97/04/15 ORIGIN : FLIC REEL NAME : 97151 CONTINUATION # : PREVIOUS REEL : CO~9~ENT : BP EXPLORATION (ALASKA),MILNE POINT, MPK-06, API #50-029-22729-00 Sperr3-Sun Drilling Services LIS Scan Utility Mon Mar 31 15:09:26 1997 Reel Header Service name ............. LISTPE Date ..................... 97/03/31 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 97/03/31 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER MILNE POINT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING Date 4~ /--0 ,.~ ~;/" MPK-06 500292272500 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 31-MAR-97 MWD RUN 2 AK-MM-60199 PIEPER WILSON MWD RUN 3 AK-MM-60199 ZIEMKE WILSON 3 12N liE 3773 2031 .00 61.50 27.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 12.250 9.625 3750.0 8.500 10195.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ANNULAR HYDRAULICS CALCULATED USING THE POWER LAW MODEL. 3. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 4. MWD RUNS 2 AND 3 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO DENSITY (SLD). 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10195'MD, 7304'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX-FIXED HOLE SIZE). SBDC = SMOOTHED BULK DENSITY (CALIPER CORRECTED). SCOR = SMOOTHED STANDOFF CORRECTION. SFPE = SMOOTHED FAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR. ENVIRONMENTAL PARAMETERS USED FOR NUCLEAR / NEUTRON LOG PROCESSING: HOLE SIZE = 8.5" MUD FILTRATE SALINITY = 500-1000 PPM MUD WEIGHT = 8.3 - 10.2 PPG FORMATION WATER SALINITY = 14545 PPM FLUID DENSITY = 1.0 G/CC MATRIX DENSITY = 2.65 G/CC LITHOLOGY = SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Nuraber ........... 1.0.0 Date of Generation ....... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH FCNT 3688.5 10119.5 NCNT 3688.5 10119.5 NPHI 3688.5 10119.5 GR 3707.5 10139.5 FET 3726.0 10112.5 RPD 3726.0 10112.5 RPM 3726.0 10112.5 RPS 3726.0 10112.5 RPX 3726.0 10112.5 DRHO 3746.0 10129.0 RHOB 3746.0 10129.0 ?EF 3747.0 10129.5 ROP 3766.0 10197.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 3680.5 3713.0 3715.5 3718.0 3720.5 3730.0 3739.0 3748.0 3754.5 3766.5 3768.5 3775.0 3777.5 3787.0 3788.5 3792.5 3796.5 3798.0 3799.0 3804.0 3807.5 3812.0 3824.0 3825.5 3828 5 3832 5 3833 5 3837 0 3846 5 3849 0 3852 5 3856 0 3859 0 3862.0 3869.0 3873 5 3878 5 3882 0 3884 5 3889 5 3892 0 3896 0 3903.5 3904.5 3907.5 3908.5 GR 3680 0 3712 5 3714 5 3717 5 3720 0 3728 0 3736 5 3745.5 3752.0 3766.0 3767.5 3773.5 3775.0 3784.0 3785.5 3788.5 3796.5 3799.0 3800.0 3803.5 3807.0 3813.0 3824.5 3827.0 3830.0 3834.5 3836.5 3840.0 3848.5 3852.0 3854.5 3857.0 3862.0 3864.0 3873.0 3877.5 3882.0 3885.0 3888.5 3893.5 3896.0 3897.5 3904.0 3906.0 3909.0 3911.0 EQUIVALENT UNSHIFTED DEPTH 3931.0 3960.5 3964.5 3968.0 3972.0 4030.5 4033.0 4035.0 4036.5 4038.0 4041.0 4048.0 4071.0 4076.0 4082.0 4085.0 4087.0 4089.5 4092.0 4095.5 4130.5 4133.5 4138.0 4140.5 4147.0 4150.0 4151.5 4170.5 4174.0 4176.5 4178.0 4180.5 4185.5 4190.5 4194.0 4200.5 4205.5 4208.0 4212.5 4213.5 4216 0 4221 5 4224 0 4225 5 4227 0 4229 0 4233 0 4234.0 4241.0 4245.0 4248.0 4251.0 4255.5 4257.5 4262.5 4267.5 4277.0 4279.5 4280.5 4305.5 4308.0 4313.0 4321.0 4323.0 3933.5 3959.5 3967.0 3971.0 3977.0 4031.5 4033 0 4034 0 4035 0 4038 0 4039 0 4048 0 4078.5 4083.5 4089.0 4090.0 4092.5 4095.0 4096.0 4099.0 4130.5 4134.0 4138.5 4141.5 4152.0 4153.5 4155.5 4175.0 4176.0 4177.5 4180.0 4183.5 4188.5 4191.5 4196.0 4203.5 4206.5 4210.0 4214.5 4215.5 4218.0 4222.0 4224.0 4225.5 4227.0 4230.5 4233.5 4235.0 4242.0 4244.0 4247.0 4251.0 4257.5 4259.0 4264.0 4270.0 4279.0 4280.5 4282.5 4304.5 4307.0 4314.0 4322.5 4324.0 4324.5 4363 5 4367 5 4373 0 4379 0 4383 0 4403 5 4406 5 4410 0 4414 0 4418.5 4420.0 4423.0 4425.5 4432.0 4435.0 4443.5 4445.5 4447.0 4457.0 4459.0 4465.0 4483.0 4490.0 4496.5 4508.5 4510.5 4512.0 4513.5 4515.0 4532.0 4541.0 4544.5 4553.0 4558.5 4559.5 4561.5 4567.0 4573.0 4575.5 4577.0 4579.5 4582.5 4590.5 4594.5 4598.5 4601.0 4606.0 4612.0 4623.5 4626.5 4634.5 4635.5 4637.0 4638.5 4647.0 4662.0 4665.0 4668.5 4672.0 4672.5 4698.0 4714.0 4727.5 4327.5 4.364.5 4370.0 4377.0 4379.5 4384.5 4405.0 4407.0 4409.5 4415.0 4420.0 4421.5 4423.5 4425.5 4433.5 4436.0 4443.5 4446.0 4448.0 4458.0 4460.0 4466.0 4483.0 4491.0 4496.5 4510.5 4514.0 4516.0 4518.5 4520.0 4530.5 4541.5 4543.5 4553.5 4559.0 4560.0 4563.0 4568.5 4574.0 4575.5 4577.5 4579.0 4582.5 4592.0 4594 5 4598 0 4602 0 4605 0 4612 0 4623 0 4625 5 4633 0 4635 5 4637 5 4639 0 4647.5 4662.5 4665.5 4670.0 4672.0 4673.0 4698.0 4714.5 4729.0 4735.0 4741.0 4746.0 4759.0 4838.0 4845.5 4884.5 4891.5 4912.5 4913.5 4917 5 4920 0 4922 0 4927 0 4933 0 4935 0 4937 0 4939 0 4943.5 4946.5 5023.0 5025.0 5026.5 5034.0 5037.5 5042 0 5046 0 5050 5 5063 0 5065 0 5100 5 5103.5 5105.5 5110.0 5153.0 5156.5 5161.0 5163.0 5164.5 5167.0 5168.5 5176.5 5226.5 5228.0 5231.0 5234.5 5236.5 5250.5 5254.5 5257.5 5258.5 5269.5 5275.0 5276.5 5280.0 5347.5 5352.5 5356.5 5358.0 5360.0 5365.0 5368.0 5391.5 5395.0 4738.0 4741.5 4745.5 4760.0 4839.0 4846.0 4884.5 4890.5 4908.5 4909.5 4913.5 4918.5 4922.0 4926.5 4934.5 4937.0 4939.5 4941.5 4945.0 4947.5 5023.5 5024.5 5025.5 5034.5 5040.0 5043.5 5046.0 5051.0 5063.5 5065.0 5101.5 5103.0 5105.5 5110.5 5151.0 5157.0 5160.5 5164.5 5165.5 5168.5 5170.0 5176.5 5225.0 5226 5 5231 5 5233 5 5236 0 5249 5 5253 0 5257.0 5258.0 5270.5 5275.0 5277.0 5280 5 5348 0 5354 0 5357 5 5359 0 5361 0 5365.5 5369.5 5392.5 5397.0 5397.0 5401.0 5457.5 5459.0 5462.0 5471.0 5506.0 5509.0 5521.0 5525.0 5537.0 5549.0 5549.5 5553.5 5601.0 5602.5 5608.5 5672.0 5680.5 5697.5 5699.0 5701.0 5827.5 5835.5 5846.0 5870.0 5878.0 5883.5 5929.0 5935.0 5938.0 5939.5 5969.5 5982.0 6023.0 6026.0 6029.0 6032.0 6139.5 6141.0 6143.0 6169.5 6173.0 6176.0 6177.0 6200.5 6205.0 6213 5 6216 5 6220 5 6250 5 6252 5 6268 5 6274 0 6278 5 6280 0 6731 5 6734 5 6814 0 6817 5 6829 5 7048 5 7051 5 7054 5 5399.5 5402.5 5461.0 5462.5 5463.5 5472.5 5508 5 5510 5 5522 5 5525 5 5537 0 5547 5 5548 5 5554 0 5602 5 5603 0 5608 5 5671.5 5679.5 5699.5 5701.5 5703.5 5828.5 5836.0 5845.0 5870.0 5879.5 5884.5 5928.5 5935.0 5936.5 5939.0 5970.5 5982.0 6023.5 6026.5 6029.5 6031.5 6139.0 6141.5 6143.5 6169.5 6172.5 6175.0 6176.5 6201.0 6205.5 6212.0 6216.5 6220.0 6250.5 6253.0 62 65.5 6270.5 6276.5 6277.5 6732.0 6735.5 6815.5 6819.5 6831.5 7049.0 7051.0 7053.0 7057.0 7074.5 7078.5 7082.5 7187.0 7188.5 7189.5 7195.0 7328.0 7333.5 7338.0 7340.0 7343.5 7345.5 7411.5 7423.0 7489.0 7491.5 7732.5 7737.5 7740.0 7742.5 7875.5 7878.5 7882.0 7938.5 7958.5 7960.5 7962.0 7963.5 8009.0 8383.0 8437.5 8531.0 8533.5 8537.5 8558.O 8619.5 8635.5 8644.0 8654.0 8655.0 8666.5 8671.5 8678.0 8699.0 8700.5 8702.0 8708.0 8711.0 8713.0 8714.0 8717.0 8719.5 8721.5 8723.0 8724.5 8728.0 8730.0 8735.5 8736.5 8739.0 8743.5 8749.5 7056.0 7075.5 7080.0. 7083.5 7186.5 7188.0 7189.0 7195.5 7326.5 7329.5 7334.0 7335.5 7337.0 7343.0 7411.0 7421.5 7490.0 7492.5 7731.0 7736.0 7740.0 7743.0 7874.5 7877.0 7880.0 7938.5 7957.5 7959.5 7961.0 7963.0 8009.0 8383.5 8439.0 8529.5 8532.0 8536.0 8557.0 8619.0 8633.0 8642.0 8652.0 8653.5 8665.0 8670.5 8676.5 8697.0 8699.5 8700.5 8706.0 8710.0 8712.0 8713.5 8716.0 8718.0 8720.5 8722.0 8724.0 8726.5 8729.0 8733.5 8735.5 8738.0 8741.0 8748.0 8752.0 8824.0 8831.5 8833.0 8874.0 8878.5 8881.5 8883.5 8886.5 8891.5 8894.0 8901.0 8902.0 8903.5 8909.0 8931.5 8937.5 8944.0 8951.0 8952.5 8961.0 8963.5 8964.5 8968.0 8974.0 8977.0 8985.0 8990.0 8996.0 9006.5 9013.0 9018.5 9025.5 9034.5 9037.5 9041.0 9041.5 9042.5 9O50.5 9052.5 9055.0 9061.5 9078.5 9089.5 9094.5 9102.0 9135.0 9138.5 9145.0 9230.0 9232.0 9234.5 9239 0 9242 5 9244 5 9249 0 9253 5 9259 5 9266 5 9271 0 9273 5 9314 0 9320 5 9325 0 8751.0 8825.0 8831.5 8832.0 8871.5 8875.5 8879.0 8882.5 8884.5 8889.0 8891.0 8900.5 8901.0 8901.5 8908.5 8928.5 8933.5 8942.0 8949.0 8951.0 8959.0 8961.5 8962.5 8966.0 8972.5 8976.0 8983.0 8987.0 8995.0 9004.5 9011.5 9017.0 9023.5 9032.0 9035.0 9038 5 9039 0 9040 5 9048 0 9050 0 9053 0 9058 5 9076 5 9087.0 9092.5 9099.0 9132.5 9136.0 9142.5 9228.0 9230.0 9234.0 9237.5 9240.5 9241.5 9246.5 9251.0 9256.5 9264.5 9268.5 9270.5 9311.5 9318.0 9322.5 9331.5 9333.0 9343.0 9357.0 9370.5 9460.0 9462.0 9463.5 9471.0 9479.0 9490.5 9500.0 9509.0 9518 0 9541 0 9543 5 9545 5 9549 0 9551 0 9563.5 9565.5 9566.5 9633.0 9635.0 9637.0 9638.5 9640.0 9687.5 9719.5 9722.5 9724.0 9736.5 9738.5 9740.0 9767.0 9774.5 9781.5 9790.5 9793.0 9803.5 9805.0 9808.0 9834.5 9836.0 9838.5 9850.0 9873.0 9876.5 9885.0 9889.5 9893.0 9895.5 9911.0 9913.5 9914.5 9927.0 9932.0 9936.0 9939.5 9941.0 9966.0 10197.5 $ 9328.5 9330.0 9340.5 9354.0 9367.5 9457.5 9459.5 9461.0 9468.5 9476.0 9485.0 9498.5 9509.5 9519.0 9537.0 9542.0 9545.0 9547.0 9550.0 9560.0 9563.0 9564.5 9630.0 9631.5 9633.0 9634.0 9637.5 9683.5 9715.5 9717.0 9719.0 9731.5 9733.5 9734.5 9765.5 9769.5 9777.0 9785.0 9787.0 9796 5 9799 5 9802 0 9829 5 9831 0 9833 5 9848 0 9867 5 9870.0 9881.0 9884.0 9885.5 9888.5 9904.0 9907.0 9908.5 9925.0 9929.0 9931.5 9934.0 9935.5 9963.5 10195.0 MERGED DATA SOURCE PBU TOOL CODE ' MWD MWD $ REMARKS: B~T RUN NO MERGE TOP MERGE BASE 2 3765.0 8539.0 3 8539.0 10195.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHM~ 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 NPHI MWD P.U. 4 1 68 FCNT MWD CNTS 4 1 68 NCNT MWD CNTS 4 1 68 RHOB MWD G/CC 4 1 68 DRHO MWD G/CC 4 1 68 PEF MWD BARN 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Min Max Mean Nsam DEPT 31.5835 10197.5 6695.56 13019 ROP 2.5747 2200.78 180.076 12864 GR 1.2094 369.021 86.0864 12865 RPX 0.1999 47.2997 3.69782 12774 RPS 0.9329 2000 4.44142 12774 RPM 0.586 2000 4.73214 12774 RPD 0.1156 2000 9.76687 12774 FET 0.174 686.506 5.31799 12774 NPHI 14.7548 3041.18 69.3923 12863 FCNT 2.2763 3199.92 617.42 12863 NCNT -0.016 3832 2546.5 12863 RHOB -0.032 3.1877 2.22654 12767 DRHO -0.116 10104 24.2006 12767 PEF 1.5748 10097 234.991 12766 First Reading 3688.5 3766 3707.5 3726 3726 3726 3726 3726 3688.5 3688.5 3688.5 3746 3746 3747 Last Reading 10197.5 10197.5 10139.5 10112.5 10112.5 10112.5 10112.5 10112.5 10119.5 10119.5 10119.5 10129 10129 10129.5 First Reading For Entire File .......... 3688.5 Last Reading For Entire File ........... 10197.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generstion.~ ..... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE RPX RPS RPM RPD FET NPHI NCNT FCNT GR RHOB DRHO PEF ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. 2 .5000 START DEPTH STOP DEPTH 3680.0 8454.0 3680.0 8454.0 3680.0 8454.0 3680.0 8454.0 3680.0 8454.0 3688.0 8461.5 3688.0 8461.5 3688.0 8461.5 3707.0 8481.5 3743.5 8470.5 3743.5 8470.5 3744.5 8471.0 3765.5 8539.0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMA/MANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMY~% RAY EWR4 CNP SLD ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON STABI. LITHO DENSITY 30-DEC-96 4.88 CIM 5.46 MEMORY 8539.0 3765.0 8539.0 40.3 60.0 TOOL NUMBER PO619CRNDG6 PO619CRNDG6 PO619CRNDG6 PO619CRNDG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.500 8.5 PAC/GEL 10.00 58.0 10.6 500 6.4 2.400 1.580 2.100 1.960 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 AAPI 4 1 68 4 2 RPX MWD 2 OHMM 4 1 68 8 3 RPS MWD 2 OHN~4 4 1 68 12 4 RPM MWD 2 OHMM 4 1 68 16 5 RPD MWD 2 OHMM 4 1 68 20 6 NPHI MWD 2 P.U. 4 1 68 24 7 ROP MWD 2 FT/H 4 1 68 28 8 FET MWD 2 HOUR 4 1 68 32 9 FCNT MWD 2 CNTS 4 1 68 36 10 NCNT MWD 2 CNTS 4 1 68 40 11 RHOB MWD 2 G/CC 4 1 68 44 12 DRHO MWD 2 G/CC 4 1 68 48 13 PEF MWD 2 BARN 4 1 68 52 14 53.3 First Name Min Max Mean Nsam Reading DEPT 2.3907 8539 5928.29 9719 3680 GR 1.6956 132.169 72.6142 9550 3707 Last Reading 8539 8481.5 RPX 0 . 1999 26. 6473 3. 7173 RPS 0.9329 ~ 2000 4. 6708 RPM 0. 7262 2000 6. 94146 RPD 0.1156 2000 26.175 NPHI 0.586 447.753 47.6299 ROP 0.4909 2200.78 207.891 FET 0.174 2800 24.1799 FCNT 2.2763 2888 591.713 NCNT -0.017 3832 2574.88 RHOB -0.032 3.1877 2.21129 DRHO -0.116 8303.5 25.2013 PEF 1.5748 8415.5 165.917 9549 9549 9549 9549 9548 9548 9549 9548 9548 9455 9455 9454 3680 3680 3680 3680 3688 3765.5 3680 3688 3688 3743.5 3743.5 3744.5 8454 8454 8454 8454 8461.5 8539 8454 8461.5 8461.5 8470.5 8470.5 8471 First Reading For Entire File .......... 3680 Last Reading For Entire File ........... 8539 File Trailer Service name ............. STSLIB~002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUPRtARY VENDOR TOOL CODE START DEPTH STOP DEPTH R?X 8453.5 10110.0 RPS 8453.5 10110.0 RPM 8453.5 10110.0 RPD 8453.5 10110.0 FET 8453.5 10110.0 NPHI 8461.0 10117.0 NCNT 8461.0 10117.0 FCNT 8461.0 10117.0 RHOB 8470.5 10126.5 DRHO 8470.5 10126.5 ?EF 8470.5 10127.0 GR 8481.0 10137.0 ROP 8539.5 10195.0 $ LOG HEADER DATA - ~ DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAb94A RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABI. LITHO DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMI~) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet 02-JAN-97 4.88 CIM 5.46 MEMORY 10195.0 8539.0 10195.0 42.5 58.7 TOOL NUMBER PO619CRNDG6 PO619CRNDG6 PO619CRNDG6 PO619CRNDG6 8.500 8.5 PAC / GEL 10.20 53.0 9.4 500 4.6 1.100 .730 1.200 .500 60.0 Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MWD 3 AAPI 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 NPHI MWD 3 P.U. 4 1 68 ROP MWD 3 FT/H 4 1 68 FET MWD 3 HOUR 4 1 68 FCNT MWD 3 CNTS 4 1 68 NCNT MWD 3 CNTS 4 1 68 RHOB MWD 3 G/CC 4 1 68 DRHO MWD 3 G/CC 4 1 68 PEF MWD 3 BARN 4 1 68 0 4 8 12 16 20 24 28 32 36 40 44 48 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Min Max Mean Nsam DEPT 3.0792 10195 8861.7 3484 GR 1.4904 369.021 124.413 3313 RPX 0.977 47.2997 3.70766 3314 RPS 0.9605 46.0995 3.92962 3314 RPM 0.7831 54.176 4.54654 3314 RPD 0.9174 112.409 7.11415 3314 NPHI 1.2634 210.374 53.3706 3313 ROP 1.0189 915.82 96.6299 3312 FET 0.8065 3041.18 48.8518 3314 FCNT 2.3464 3199.92 686.739 3313 NCNT -0.022 3692.85 2451.22 3313 RHOB -0.032 3.0927 2.26871 3313 DRHO -0.099 10101 69.2517 3313 PEF 1.7664 10094.5 425.86 3314 First Reading 8453.5 8481 8453.5 8453.5 8453.5 8453.5 8461 8539.5 8453.5 8461 8461 8470.5 8470.5 8470.5 Last Reading 10195 10137 10110 10110 10110 10110 10117 10195 10110 10117 10117 10126.5 10126.5 10127 First Reading For Entire File .......... 8453.5 Last Reading For Entire File ........... 10195 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 97/03/31 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 97/03/31 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Scientific Technical Date ..................... 97/03/31 Origin ........ ~%.'...~ ..... STS Reel Name .................. UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Services Library. Scientific Technical Physical EOF Physical EOF End Of LIS File