Conservation Order Cover Page
This page is required for administrative pUrposes in managing the sCanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
"~'_~ Conservation Order Category Identifier
Organizing
CAN
Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, NO/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
BY:
Scanning Preparation
, ~ YES ~ NO
BY: ROBIN ~'~
,,
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED DOCUMENT: ~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION:
BY:
Stage 2
~F ,vo ,N STA~ ~. ~'A~(S) D,~CR~,'^.C,~S W~R~ .OU.D.' '~ .O
_ (SCANNING IS COMPLETE 'AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALrFY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
• •
Index Conservation Order 396
MP J-09
1.) June 17, 1997 BP Exploration Alaska, Inc. request for Spacing Exception
2.) July 1, 1997. Notice of Public Hearing
3.) July 3, 1997 OXY USA, Inc. letter non-objection for the Milne Point
Conservation Order 396
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage Alaska 99501-3192
Re:
THE APPLICATION OF BP )
EXPLORATION (ALASKA) INC. )
for an order granting an exception to )
spacing requirements of Title 20 AAC )
25.055 to provide for the completion of )
the BP Milne Point Unit MPJ-09 )
oil well in an undefined oil pool. )
Conservation Order No. 396
BP Exploration (Alaska), Inc.
MPJ-09
July 16, 1997
IT APPEARING THAT:
.
BP Exploration (Alaska), Inc. submitted an application dated June 17, 1997
requesting exception to 20 AAC 25.055(a)(3) to allow the completion of the BP
Milne Point Unit MPJ-09 oil well in an undefined oil pool within the Ugnu
Formation closer than 500 feet to a quarter-section line.
.
Notice of opportunity for public hearing was published in the Anchorage Daily
News on July 1, 1997 pursuant to 20 AAC 25.540.
3. No protests to the application were received.
FINDINGS:
o
The BP MPJ-09 well is a deviated hole drilled from a surface location 2347' from
the south line (FSL) and 2090' from the east line (FEL) of Section 28, T13N,
R10E, Umiat Meridian (UM) with a proposed Ugnu Formation producing interval
from 4298' FSL and 87' FEL of Section 29, T13N, R10E, UM to 4427' FSL and
151 FEL of Section 29, T13N, R10E, UM.
2. Offset owner, Occidental Petroleum Corporation has been duly notified.
o
An exception to 20 AAC 25.055(a)(3) is necessary to allow the proposed
completion of this well.
Conservation Orde~~ No _ o
July 16, 1997
Page 2
CONCLUSION:
Granting a spacing exception to allow the completion of the BP MPJ-09 well within the
Ugnu Formation undefined oil pool as proposed will not result in waste nor jeopardize
correlative rights.
NOW, THEREFORE, IT IS ORDERED:
BP Exploration (Alaska), Inc.'s application for exception to 20 AAC 25.055 for the
purpose of completing the Milne Point Unit MPJ-09 well as proposed is approved.
DONE at Anchorage, Alaska and dated July 16, 1997.
David W. Johnston,
Alaska and Gas Con,.
Commission
Robert N.~tenson, Commissioner
Alaska Oil and Gas Conservation Commission
AS 31.05.080 provides that within 20 days after receipt of written notice of the entry of an order, a person affected
by it may file with the Commission an application for rehearing. A request for rehearing must be received by
4:30 PM on the 23rd day following the date of the order, or next working day if a holiday or weekend, to be timely
filed. The Commission shall grant or refuse the application in whole or in part within 10 days. The Commission
can refuse an application by not acting on it within the 10-day period. An affected person has 30 days from the date
the Commission refuses the application or mails (or otherwise distributes) an order upon rehearing, both being the
final order of the Commission, to appeal the decision to Superior Court. Where a request for rehearing is denied by
nonaction of the Commission, the 30-day period for appeal to Superior Court runs from the date on which the
request is deemed denied (i.e., 10th day after fl~e application for rehearing was filed).
OXY
OXY USA INC,
50250, Midland, TX 79710
Edward J. B.>hm,
Aaset Team Leader
Heavy Oil Team
Western Region
0RI
Pl~on¢ (9 ! 5) 6R5-$673
Fax: (915) 685-593!,
r,.:Mail Ed_B~m~,.oxy, corn
July 3, 1997
Alaska Oil and Gas Conservation Commission
FAX No. 907 276-7542
Attention: Mr. Bob Crandall
Reference: Application for Spacing Exemption for the
Milne Point Unit J-09 Well
RECEIVED
~..aska.Oil,& Gas Cons.
Dear Mr. Cmadall:
OXY USA Inc., as affected party, bas no objection for the Milne Point J-09 Well as proposed in Robert Laule's
request to you.
Should you have any questions, Please give me a call at 915 685-5673.
Thank you,
Joe Petrov for Ed Behm, Jr.
Asset Team Leader
Heavy Oil Team
EJB/esm
too~
'l.'g6g g99 g~fi X'V2t -['£:gT llHff~ Ltl~gO~LO
Notice of Public Hearing
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Re~
The application of B.P. Exploration (Alaska) Inc. for exception to
20 AAC 25.055 to allow completion the Milne Point J-09 development oil
well in an undefined oil pool.
B. P. Exploration (Alaska) by letter dated June 17, 1997 has requested an
exception to the provisions of 20 AAC 25.055(a)(3) to test produce an undefined
oil pool in the Milne Point area.
The exception would allow B. P Exploration (Alaska) to perforate the
Milne Point J-09 development oil well in an interval that is closer than 500 feet
from a quarter section line. The surface location is 2347' from the south line
(FSL), and 2090' from the east line (FEL) of Section 28, T13N, R10E, Umiat
Meridian (UM) and the proposed top of the perforation interval is 4298' FSL and
87' FEL of Section 29, T13N, R10E, UM.
A person who may be harmed if the requested order is issued may file a
written protest prior to 4:00 PM July 15, 1997 with the Alaska Oil and Gas
Conservation Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501,
and request a hearing on the matter. If the protest is timely filed and raises a
substantial and material issue crucial to the Commission's determination, a
hearing on the matter will be held at the above address at 9:00 am on July 31,
1997 in conformance with 20 AAC 25.540. If a hearing is to be held, interested
parties may confirm this by calling the Commission's office, (907) 279-1433 after
July 15, 1997. If no protest is filed, the Commission will consider the issuance of
the order without a hearing.
If you are a person with a disability who may need a special modification
in order to comment or to attend the public hearing, please contact Diana Fleck
at 279-1433 no later than July 23, J.99.7.,,
Robert Christenson, Commissioner
Alaska Oil and Gas Conservation Commission
Published July 1 1997
ADN AO-02714037 '
BP EXPLORATION
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
(907)561-5111
June 17, 1997
David W. Johnston, Commissioner
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
RE: Request of Exemption to Provisions of 20AAC 25.055
and Conservation Order 173 Rule #3 for MP J-09.
Dear Commissioner Johnston,
BP Exploration (Alaska), Inc. hereby applies for an exemption to the
provisions of 20 AAC 25.055 and Conservation Order 173 Rule #3 for MP J-09
Well.
1. Surface Location:
2347 NSL 2090 WEL Sec 28 T13N R10E UM., AK
2. Top Ugnu Target Location: 4298 NSL 87 WEL Sec 29 T13N R10E UM., AK
3. Bottom Ugnu Location: 4427 NSL 151 WEL Sec 29 T13N R10E UM., AK
The owners and operator of all governmental quarter sections directly and
diagonally offsetting the proposed location of the well are BP Exploration
(Alaska), Inc., and Occidental Petroleum. This is a test of the UGNU no other
well in the adjacent quarter sections produce from the Ugnu although the Ugnu is
penetrated to access deeper formations. The plat required by the regulation is
attached as Exhibit 1. The verification required by the regulation is attached as
Exhibit 2. Copies of the notification to the owners and operators, as well as the
required information with respect to the mailing are attached in the package
designated as Exhibit 3.The Sundry Notice for the proposed scope of work is
attached as Exhibit 4.
Thank you for you assistance in this matter. Please direct any questions
to Tom Niswander at 564-5472 or myself at 564-5195.
Respectfully,
Exhibit I
BPE&O 64.38
BPX 26.81
OXY USA 8,81
ADL025515
BPE&O 64.38
BP~ 2~.~!~i
ADL315848
BP E & O 64.38
BPX 26,81
OXY USA 8,8'~. OXY USA 8.81
BPE&O 64,38
AD L025518
BPE&O 64.38
23
L~¢P E & O
BPX 26.81
OXY USA 8,81
N PAD
WEST SAK 25 ~
~PU
J PAD
BPX 26.81
OXY USA 8.817¢
¢I~-~- BPX 26,81
OXY USA 8,8'
BP EXPLORATION (ALASKA) INC,
MILNE POINT UNIT
J PAD - LEASE OWNERSHIP
Leases Current To 4/30/97
DATE: SCALE: SHEET:
6/97 1" = .5 MILE 1 of 1
Ira13524,dtg
NW Sec 29
T13N R10E Umiat M.
X=544733.14
Y=6017629.83
5279.49
89o38'08''
SW Sec 29 5279.49
T13N R10E Umiat M. 89°38'08"
X=544783.55
Y=6012350.55
Well MPJ-09
Downhole Information
J. Cotton 6/4/97
Scale ~1 "-1500'
+
N Sec 28&29
T13N R10E Umiat M.
X=550012.52
Y=6017663.41
5279.49
89o35'42"
MPJ-09
Bottom Taraet ~
X=549869.~ 1 , '"'d~.ff?'~o,_~.:
Y:6016809.70 a~ ~
M P J-00 '
Top Of Ugnu Target ~
X=549935.04
Y=6016681.11
-
O,1°
MPJ-09
Surface Loc.
X=552129.93
=6014745.62
se(..-rt D hs
S Sec 29&28
T13N R10E Umiat M.
X=550062.93
Y=6012384.14
5279.48
89035'42"
NE Sec 28
T13N R10E Umiat M.
X=555291.88
Y=6017700.73
o;--
SE Sec 28
T13N R10E Umiat M.
X=555342.28
Y=6012421.46
Coordinates shown are ASP Zone 4 (NAD 27)
NWSec29
T13N R10E Umiat M.
X=544733.14
Y=6017629.83
N Sec 28&29
T13N R10E Umiat M. -
5279 X=550012.52 5279
89o38,08'' Y=6017663.41 89o35'42"
Bottom Target
5e(,,,~ L.~ ~ '~.~:;~ X=549869.81
Y=6016809.70 151
MPJ-09 87
Top Of Ugnu Target
X=549935.04
Y=6016681,11.
i'
i
! ~ MPJ-09
o_,- Surface Loc.
~o r,,. X=552129.93
m~ Y=6014745.62
3190
Well MPJ-09
Downhole Information Detail
J. Cotton 6/4/97
Scale 1 "-1500' ..
POL
Sec Tie Point
X-552146.52
y=6012398.87
SW Sec 29 5279 S Sec 29&28
T13N R10E Umiat M. 89°38'08" T13N R10E Umiat M.
X=544783.55 X=550062.93
Y=6012350.55 Y=6012384.14
5279
89035'42"
Coordinates shown are ASP Zone 4 (NAD 27)
EXHIBIT 2
VERIFICATION OF APPLICATION FOR SPACING EXCEPTION
MILNE POINT J-09
R. Laule, Drilling Operations Engineer, BP Exploration (Alaska) Inc., does hereby
verify the following'
1. I am acquainted with the application submitted for the drilling of Milne
Point J-09 Well.
2. I have reviewed the application submitted for the exemption to 20 AAC
25.055, Conservation order 173 Rule #3 and all the facts therein are true.
3. I have reviewed the plat attached as exhibit 1 and it correctly portrays
pertinent and required data.
DATED at Anchorage, Alaska this 12th day of June, 1997.
Drilling Operations Engineer
STATE OF ALASKA
THIRD JUDICIAL DISTRICT
SUSCRIBED AND SWORN TO before me this 12th day of
June, 1997.
41a$.~'.a.Oil.& Gas C'm'~s. Commis~,
Y PUBLIC IN AND FOR ALASKA
My commission expires:
P 583 693 177
us Pos~ se~c~ "~~
Receipt for Certified Mail
-!
No Insurance Coverage Provided.
Do not use for Intemational Mail.'See reverse,)
?.D.DoX $o~..,.~ u
Post Offll:e, State,re& Z[E..~ojle
Sped~l D~ivery Fee
Restricted I:)e~very Fee
R~um Rac~~ / /.,~:~,
·
Scope of work for the MP J-09 workover is to decomplete the well, suspend the
Schrader Bluff perforations with an isolation plug, perforate the Ugnu and recomplete
with an ESP and 2-7/8" tubing to test the production of the Ugnu.
Pre Rig activity
Pull the dummy valve from the lower GLM above the ESP and set BPV.
MIRU 4ES
Pull BPV with lubricator kll well and set TWC.
ND tree. NU BOP and test.
Pull TWC with lubricator.
Pull tubing, ESP and heat trace.
RIH with GR/JB.
RIH and set bridge plug. (temporary suspension of the Shrader Bluff Perforations)
RU wireline and perforate the Ugnu formation.
Run ESP with 3 glm's & heattrace to new setting depth.
Set TWC. ND bop. Nu and test tree.
BP EXPLORATION
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
(907)561-5111
Bob Crandall
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
June 17, 1997
Subject: Application requesting Spacing Exemption for MP J-09 to provisions of 20 AAC
25.055 and Conservation Order 173 Rule #3.
Dea,' Mr. C~andall,
.The MP J-09 well is a planned test of the Ugnu Formation in the NW/4 of Sec
29T13N, R10.E ',,ithin ADL lease 025517.
BP Exp~,:~ration (Alaska), Inc. hereby applies for an exemption to the provisions
of 20 AAC 25.055 .~md Conservation Order 173 Rule #3 for MP J-09 Well (the well), for
which the following is proposed:
1. Surface Location: 2347 NSL 2090 WEL Sec 28 T13N R10E UM., AK
2. Top Ugnu Target Locatio~..: 4298 NSL 87 WEL Sec 29 T13N R10E UM., AK
3. Bottom Ugnu Location: 4427 NSL 151 WEL Sec 29 T13N R10E UM., AK
The well MP J-09 will be comp~'¢l'¢d with an electrical submersile pump. The
surface location of MPJ-09 is located in Sec 2~ .which is within ADL lease 025906. The
target and bottom hole locations are located in the N'IE/4 ,~f Sec 29 which is within ADL
lease 025517 as indicated in the enclosed exhibits. The proposed target and bottomhole
locations are within the NE/4 of Sec 29 T13N, R10E but are in close proximity to the
eastern and northern boundaries of this quarter section. The spacing requirements of
20 AAC 25.055 and Conservation Order 173 Rule #3 do not allow without exemption the
drilling of a well closer than 500 feet to any quarter section line. This request for
exemption is being sought to allow testing of the Ugnu formation from MPJ-09. The
owners and operator of all governmental quarter sections directly and diagonally
offsetting the proposed target and bottom hole location of the well are BP Exploration
(Alaska), Inc., and Occidental Petroleum. The plat required by the regulation is attached
as Exhibit 1. The verification required by the regulation is attached as Exhibit 2. Copies
of the notification to the owners and operators, as well as the required information with
respect to the mailing are attached in the package designated as Exhibit 3. The Sundry
Notice for the proposed scope of work is attached as Exhibit 4.
As indicated by the information enclosed in Exhibit 1, Exhibit 2, Exhibit 3, and
Exhibit 4 we verify these facts to be true and that the plat portrays the pertinent and
required data. We also feel that this addresses the requirements of the provisions in 20
AAC 25.055 and Conservation Order 173 Rule #3.
Thank you for you assistance in this matter. Please direct any questions to Tom
Niswander at 564-5472 or myself at 564-5195.
R¢~p,ectfully, ~ ...~
Robert Laule
cc BPX
OXY
Exhibit 3
BP EXPLORATION
900 East Benson Boulevard
Anchorage, Alaska 99519-6612
(907)561-5111
June12,1997
Occidental Petroleum
Ed Behm
P.O.BOX 50250
Midland, TX79710-0250
RE: Request for Spacing Exemption for MP J-09 to provisions of 20 AAC 25.055 and
Conservation Order 173 Rule #3.
Dear Mr. Behm
Pursuant to the provisions and requirements of 20 AAC 25.050 (b) BP
Exploration (Alaska) Inc. hereby gives notice of a request to the Alaska Oil and Gas
Conservation Commission for an exemption to the provisions of 20'AAC 25.055(a) 1, 20
AAC 25.055 and Conservation Order 173 Rule #3 for MP J-09 Well (the well).'
Specifically, the exemption location applied for will beas followed::
.
Surface Location:
Top Ugnu Target Location:
Bottom Ugnu Location:
2347 NSL 2090 WEL Sec 28 T13N R10E UM., AK
4298 NSL 87 WEL Sec 29 T13N R10E UM., AK
4427 NSL 151 WEL Sec29 T13N R10E UM., AK
A copy of the request is attached.
Very truly yours,
Robert Laule
enc.
i STATE OF ALASKA (',
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
Exhibit 4
1. Type of Request: []Abandon [] Alter Casing
[] Change Approved Program
2. Name of Operator
BP Exploration (Alaska) Inc.
[] Suspend [] Plugging [] Time Extension
[] Repair Well [] Pull Tubing [] Variance
[] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2347' NSL, 2090' EWL, SEC. 28, T13N, R10E
At top of productive interval
4522' NSL, 200' WEL, SEC. 29, T13N, R10E
At effective depth
2495' NSL, 1523' WEL, SEC. 20, T13N, R10E
At total depth
2912' NSL, 1616' WEL, SEC. 20, T13N, R10E
[] Perforate
[] Other
Plugback to Re-complete
5. Type of well:
I~ Development
i---I Exploratory
[--I Stratigraphic
[]Service
6. Datum Elevation (DF or KB)
KBE = 65.06'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPJ-09 -
9. Permit Number
94-101 / 397-074
10. APl Number
50-029-22495
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured 10860 feet
true vertical 7431 feet
Effective depth: measured 10083 feet
true vertical 6693 feet
Casing
Length Size
Structural
Conductor 80' 13-3/8"
Surface 2905' 9-5/8"
Intermediate
Production 10811' 7"
Liner
Plugs (measured)
Junk (measured)
Cement plug at 10083' (4/97)
Packer fish at 9893'
Cemented MD TVD
250 sx Arcticset (Approx.) 112' 112'
572 sx PF 'E', 250 sx 'G' 2936' 2529'
400 sx Class 'G' 10840' 7479'
Perforation depth:
measured
true vertical
10328'-10342',10355'-10361',10442'-10462',10475'-10507' Cqueezed)
5460'-5480',5792'-5802' ~pen)
7049'-7061',7072'-7077',7144'-7161',7172'-7198' ~queezed)
3906'-3919',4122'-4128' ~pen)
Tubing (size, grade, and measured depth) 2-7/8" 6.3# L-80 tubing at 5512'
Packers and SSSV (type and measured depth) 7" X 3-1/2" SABL-3 Baker packer w/K-anchor at 10019'
13. Attachments [] Description summary of proposal I--'1 Detailed operations program I--I BOP sketch
14. Estimated date for commencing operation
August 15, 1997
16. If proposal was verbally approved
Name of approver
contact Engineer Name/Number: Bob Laule, 564-5195
Date approved
15. Status of well classifications as:
I~ Oil [--I Gas I'-I Suspended
Service
Prepared By Name/Number: Kathy Campoamor, 564-5122
17. I hereby certify that the foregoing is tr~e and cprrect to the best of my knowledge
Signed
Tim Schofield /I,~'~ ~'*~ C).4"~~**~ Title Senior Drilling Engineer
// Commission Use Only
Conditions of Approval: Notify Commission' g so representative may witness Plug integrity
Mechanical Integrity Test __ Subsequent form required 10-
Date
I Approval No. 397-074
Approved by order of the Commission
Commissioner Date
Form 10-403 Rev. 06/15/88 Submit In Triplicate
P 583 693 177
US Postal Service
Receipt for Certified Mail
No Insurance Coverage Provided.
Do not use for Intemational Mail 'See reverse~
Sent to ' ; ' '
Str~t ~Number ._.. _
~.~.DoX ~o~-~ u
Post Office, State.,&
Special Deliveq/Fee
Restricted Delivery Fee
R~'m RK.~.~~
...
. .............
.....
BP EXPLORATION
May 14, 1997
Mr. David Johnston, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 9951
I VED
Dear Mr. Johnston,
BP Exploration (Alaska), Inc., as operator of the Milne Point Unit is planning to
evaluate the producibility of the M-sands, lower Ugnu formation. We intend to
employ a new production practice that has been very successful in Canada in
imprOving both production rates and recovery performance from reservoirs that.
haVe highly viscous oil in unconsolidated formationS. This technique eliminates
downhole screens and stabilizes fOrmation sand in the near wellbore region. A
Schrader Bluff test is in progress and the next logical progression is to evaluate
this technique on the lower Ugnu.
Currently, an evaluation of the sand production characteristics of the Schrader
Bluff N-sands in well MPJ-09 is proceeding. The objective of the MPJ-09 test is
to determine if sand can be managed to a Iow sand rate without screens by
minimizing drawdown rates to allow sand consolidation in the formation, and to
determine if sand can be transported to the surface. An electrical submersible
progressive cavity pump (ESPCP) is being used to produce the fluid. These
pumps are more tolerant to sand production than a centrifugal electrical
submersible pump (ESP). A portable test separator will monitor well
'performance and measure sand volumes throughout the test. The results of this
test will influence the direction of future Schrader Bluff completions.
In order to further 'increase our understanding of the heavy oil potential within
Milne POint, BP Exploration is conSidering a similar type of test in the lOwer Ugnu
using the same well. The objective of this test would be to initiate sand
production, and monitor oil and sand production rates with time. To perform this
BP Exploration (Alaska) Inc.
test, well MPJ-09 would be completed, isolating the Schrader Bluff interval with a
removable bridge plug, and a section of the M-sand formation perforated and
produced. Following the M-sand test, the interval would be cement squeezed,
the bridge plug pulled and Schrader Bluff interval put back on production.
As BP Exploration formulates it's Milne Point Unit viscous oil development there
may be opportunities to develop the M-sand concurrently with the Schrader Bluff
reservoir. The information acquired from this test will assist in our understanding
of the opportunities. A potential possibility for the lower Ugnu formation is
commingling production from the M-sands with the Schrader Bluff. Commingling
production from lower Ugnu with the Schrader Bluff reservoir is potentially
attractive because oil from the Schrader Bluff would act as a diluent for the
higher viscous lower Ungu oil at the same time reducing the lower Ugnu
development costs.
Please direct any questions or concerns regarding the lower Ugnu test to me at
564-5232 or to Steve Rossberg at 564-5637.
Sincerely,
---¢'L Bruce J. Policky
Exploitation Manager
Western North Slope
CC:
Mr. Jack Hartz, AOGCC
Ed Behm, Oxy USA Inc