Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCO 397Conservation Order Cover Page
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
Conservation Order Category Identifier
Organizing
RESCAN
Color items:
Grayscale items:
Poor Quality Originals:
Other:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plottedscanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
NOTES'
BY:
ROBI0
Scanning Preparation
TOTAL PAGES
Is~
BY:
ROBIN~
Production Scanning
Stage I PAGE COUNT FROM SCANNED DOCUMENT: ~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION'
/si
,~)~'YES __ NO
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: __ YES __ NO
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES.)
II I1! II II
General Notes or Comrnents about this Document:
5/21103 ConservOrdCvrPg.wpd
~ •
Index Conservation Order 397
Granit Point No. 55
1.) July 3, 1997 Union Oil Company of California request for Spacing
Exception
2.) July 10, 1997 Notice of Public Hearing, Affidavit of Publication
Conservation Order 397
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage Alaska 99501-3192
Re~
THE APPLICATION OF UNION )
OIL COMPANY OF CALIFORNIA )
for an order granting an exception to )
spacing requirements of Title 20 AAC )
25.055 to provide for the drilling of the )
Granite Point No. 55 development )
oil well. )
)
Conservation Order No. 397
Union Oil Company of California
Granite Point No. 55 well
July 29, 1997
IT APPEARING THAT:
.
Union Oil Company of California (Unocal) submitted an application dated July 8, 1997
requesting exception to 20 AAC 25.055(a)(3) to allow drilling the Granite Point State
No. 55 development oil well to a producing location that is closer than 500 feet to a
drilling unit boundary.
2. Notice of opportunity for public hearing was published in the Anchorage Daily News
on July 10, 1997.
3. No protests to the application were received.
iFINDINGS:
The Unocal Granite Point State No. 55 well as proposed will be a deviated hole drilled
from a surface location 2437' from the north line (FNL) and 1303' from the west line
(FWL) of Section 13, TION, R12W, Seward Meridian (SM), the proposed top of the
productive interval is 5230' FNL and 1.100' FWL of Section 23, T10W, R12W SM,
and the proposed bottom-hole location is 2,350' FNL and 4780' FWL of Section 27,
TION, R12W, SM.
2 Offset owner Mobil Oil Company has been duly notified.
3. An exception to 20 AAC 25.055(a)(3) is necessary to allow drilling of this well.
Conservation Order No. 39~[
July 29. 1997
Page 2
CONCLUSION:
Granting a spacing exception to allow drilling of the Unocal Granite Point No. 55 well as
proposed will not result in waste nor jeopardize correlative rights.
NOW, THEREFORE, IT IS ORDERED:
Unocal's application for exception to 20 AAC 25.055 for the purpose of drilling the
Granite Point 'No. 55 well is approved as proposed.
DONE at Anchorage, Alaska and dated July 29, 1997.
Alaska Oil a~ation Commission
Alaska Oil and Gas Conservation Commission
AS 31.05.080 provides that within 20 days ariel' receipt of written notice of the entry of an order~ a person affected hy it may file with
the Commission an application tbr rehearing. A request for rehearing must be received hy 4:30 PM on the 23rd day following the date
of thc order, or next working day ifa holiday or wcckcnd. Io be timely filed. The Commission shall grant or refuse the application in
whole or in parl within 10 days. The Commission can refuse an application by not acting on it within the 10-day period. An affected
person has 30 days from the date the Commission refuses thc application or mails (or otherwise distributes) an order upon rehearing,
both being the final order of the Commission. to appeal the decision to St,perior Court. Where a reqnest fol' rehearing is denied by
nonaction ofthe Commission. Iht 30-day period tbr appeal to Superior Court runs from the date on which thc request is deemed denied
(~i.e., 10th day after thc application lbr rehearing; was filed).
f~4978 (
STOF0330 ~
A0-028%4001 AFFIDAVIT
$85.47
OF
PUBLiCATiON
STATE OF ALASKA, )
THIRD JUDICIAL DISTRICT. )
Eva H. Kaufmann
being first duly sworn on oath
deposes and says that he/she is
an advertising representative of
the Anchorage Daily News, a
daily newspaper. That said
newspaper has been approved
by the Third Judicial Court,
Anchorage, Alaska, and it now
and has been published in the
English language continually as a
daily newspaper in Anchorage,
Alaska, and it is now and during
all said time was printed in an
office maintained at the aforesaid
place of publication of said
newspaper. That the annexed is
a copy of an advertisement as it
was published in regular issues
(and not in supplemental form) of
said newspaper on
July 10, 1997
and that such newspaper was
regularly distributed to its
subscribers during all of said
period. That the full amount of
the fee charged for the foregoing
publication is not in excess of
the rate charged private
individuals.
signed ~
SUbscribed and sworn t,~o ~
me this ...~..'.~-. day of ....~.~..d..~
.....
............. ....
Third Division.
Anchorage, Alaska
MY CONWtlSSION F~PIRES
My Commission t.~ircs:
............... .~e. bm~t~..8.,..2...0~.. ...... 19 ......
Notice of Public Hearing ,
STATE OF ALASKA
Alaska Oil and Gas
Conservation Commission
Re: The application of Union
Oil Company of california
(Unocal) for ,exception to
AAC 25.05S to allow drilling the
Granite Point No. SS develop-
ment oil well.
Unocal bY letter dat~ July
8, ,1997 has requested an exceP-
tion to the provisions of 20
AAC 25.055(a)(3)'for the dril-
ling of a development oil well
to an undefined portion of the
Middle Kenai oil' pool of the
Granite Point Field located tn
the Cook inlet .Basin,
Southcentral, Alaska.
The exception .would allow
Unoc0i to directionally drill
the Granite Point No. 55 devel-
6pment oil well to a producing
location that is .closer than 500
feet' from o section line. The
proposed surface location is
2437' from the north line
(FNL).and 1303' from the west
line '(FWL) of Section 13,
r~10N, R12W, Seward Meridian
SM)','the'Pr°posed top bf the
~rod.uctiVe interval is 5230!
T-NL. and 1100' FWL. Of Section
~3~ T10W, R1.2W~ SM,' and the
:..': .:- ~ ~-' ~.t'*~.~' ~c'" I~'cation
.~,: :.:: '-% :.".t :':' ' WL of
..,..:... , '... ;. ,.'. SM..
J A person.who may De harm-
j.'ed', if..the requested'..order.,.is
J."issued"may file a written
J. protest, pri0~; to 4:00 PM jUly
J25,. 1997 .with .the 'Alaska O.i
',J:an~ Gas COnservation ,Cam
m Ssi0n, 3001 porcupine Drive
· ,.'." ." -' '. ,... ,~ ~'¢I .... i-.."'.r ' .'
· .,;':.=':.'. '... ",...:~ .~ . 'melyJ
· .: ,,..... ,.: ...:.: .: · '.".' .intial
=~.:.~ ,v.. .... ;.. ~......: :-..:..al roi
Jth~' ..commission's aetermina-
Jfiofi, O"hear ng 'on, tthe. matterl
J wiil:"be held!at the above ad-'l
J i~it,~S~.'.~af .'9.0o am'.' on, A'ugust '.12, J
',j,:::~- .......,,~.,~.~,- ' ,,,.*~, 20J
.... ~ ..' · .... .-" . tO'
~' ".." ' . :., .'.. ....."les'
. :,'.,........ ......... .~ -. ~
'the Camm sslon',s o.,ce, ,~,07)
27~:;1433':ofter ,Ju ¥ 25; 1997.. If
no protest 'iS .f/led,].the
.C(~mm.iss{od .Wi.l:l;' cdn~icler, the
Is~u'en'ce of the order without a
hearinm' . '
:..!' If,you ore a person With a
di~abi tY Who' m0y 'need'
special .mod f cation', in order
to' comment .or' ,to' attend the
Publi'c hear'inm 'please.'contaCt
.D, LqD,~..Fleck". at. 27~-1433 no
~ I '~SU~.;n.~~
Notice of Public Hearing
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Re~
The application of Union Oil Company of California (Unocal) for exception to 20
AAC 25.055 to allow drilling the Granite Point No. 55 development oil well.
Unocal by letter dated July 8, 1997 has requested an exception to the provisions of
20 AAC 25.055(a)(3) for the drilling of a development oil well to an undefined portion of
the Middle Kenai oil pool of the Granite Point Field located in the Cook Inlet Basin,
Southcentral Alaska.
The exception Would allow Unocal to directionally drill the Granite Point No. 55
development oil well to a producing location that is closer than 500 feet from a section
line. The proposed surface location is 2437' from the north line (FNL) and 1303' from the
west line (FWL) of Section 13, T10N, R12W, Seward Meridian (SM), the proposed top
of the productive interval is 5230' FNL and 1100' FWL of Section 23, T10W, R12W,
SM, and the proposed bottom-hole location is 2,350' FNL and 4780' FWL of Section 27,
T1 ON, R12W, SM.
A person who may be harmed if the requested order is issued may file a written
protest prior to 4:00 PM July 25, 1997 with the Alaska Oil and Gas Conservation
Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501, and request a hearing on
the matter. If the protest is timely filed and raises a substantial and material issue crucial
to the Commission's determination, a hearing on the matter will be held at the above
address at 9:00 am on August 12, 1997 in conformance with 20 AAC 25.540. If a
hearing is to be held, interested parties may confirm this by calling the Commission's
office, (907) 279-1433 after July 25, 1997. If no protest is filed, the Commission will
consider the issuance of the order without a hearing.
If you are a person with a disability who may need a special modification in order
to comment or to attend th~q~a~~dB..g/'~~~l~iana Fleck at 279-1433 no
later than August ~
David W<. Johnston ~
Chairman~.......~_.... }
Published July 10, 1997
AO-02814001
Unocal Alaska Resource'
Unocal Corporation
909 West 9th Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 276-7600
UNOCAL )
July 8, 1997
Mr. David W. Johnston, Chairman
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
Subject: GRANITE POINT #55
REQUEST FOR SPA CING
EXCEPTION
ADL 18761, ADL 374045, and
ADL 3 74044
Dear Chairman Johnson:
Submitted in triplicate is our application for Permit to Drill Granite Point #55, ADL
18761 (form 10-401) pursuant to 20 AAC 25.005 and our check No.2002326 in the
amount of $100.00 as required under 20 AAC 25.005 (c) (1). Verification of Application
by the undersigned stating that applicant is acquainted with the facts pursuant to 20 AAC
25.055 (b) is attached as part of this application.
It is requested that the Commision approve an exception to the statewide spacing
regulation 20 AAC 25.055 (3) for the drilling of well Granite Point #55, ADL 18761
from the Granite Point Platform.
Granite Pt. #55: The specific location, interval, and depth are as follows:
Top of Productive Interval
50'FSL, 1,100' FWL, Sec.23, T1 ON, R12W, SM
Bottom of Productive interval
2,350' FNL, 500' FEL, Sec 27, T10N, R12W, SM .,
.~ Anch0rago
All applicable provisions of 20 AAC 25.050 (Deviation) have been met for each
application and each owner and all operators of governmental quarter sections directly or
diagonally offsetting the section where the oil wells are located have been notified by
RECEIVED
JUL 08 199 (
Alaska Oil & ~las Cons. Commission
registered mail pursuant to 20 AAC 25.055 (b). A copy of said notification is attached
hereto.
If you require additional information, call me at 907-263-7882, or contact Neal MaGee,
Drilling Department at 907-263-7671.
Sincerely,
UNION OIL COMPANY OF
CALIFORNIA, d.b.a. UNOCAL
Rick D. Cross
Landman
Enclosures:
CC: Mobil Exploration & Producing U.S. Inc.
REC[ ]VED
J U L C ~ ~t~,~7'
Alaska Oi]& Gas Cons. Commission
Anchora9~
VERIFICATION OF APPLICATION FOR SPACING EXCEPTION
GRANITE POINT FIELD, COOK INLET, ALASKA
STATE OF ALASKA ADL # 18761
GRANITE POINT PLATFORM
I, RICK D. CROSS, Landman, Union Oil Company of California, do hereby verify the
following:
I am acquainted with the application submitted for the drilling of the
Granite Point Field, #55 platform well.
I have reviewed the application submitted for the exception to 20 AAC
25.055 (3) (statewide spacing) and all facts therein are true.
I have reviewed the plat attached to said application, and it correctly
portrays pertinent and required data.
DATED at Anchorage, Alaska this 8th day of July, 1997.
Rick D. Cross
Landman
STATE OF ALASKA
THIRD JUDICIAL DISTRICT
)
)ss
)
SUBSCRIBED TO AND SWORN before me this 8th day of July, 1997.
NOTARY(~UBLIC IN ANI5 FOR ~
THE STATE OF ALASKA ~,/~mrnhu~ion Expiroa
My Commission expires: I:l~m~rnber 8, 1998
Anchorag~
Unocal Alaska Resour¢i"
Unocal Corporation "
909 West 9th Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 276-7600
July 8, 1997
Mr. G. M. Moffit
Mobil Exploration & Producing U.S. Inc.
As Agent for the Mobil Rocky Mountain
Inc.
12450 Greenspoint Drive
Houston, TX 77060-1991
Cook Inlet Area
State of Alaska
Notice of Application Submittal to Drill
Granite Point Platform #55
Dear Mike:
Union Oil Company of California, Operator of the Granite Point Field and Granite
Point Platform, intends to drill the above referenced well and has submitted a
Permit to Drill application to the Alaska Oil and Gas Conservation Commission.
Pursuant to the provisions of 20 AAC 25.050, and 20 AAC 25.055, Mobil
Exploration & Producing U. S. Inc. as Agent for Mobil Rocky Mountain Inc. is the
only affected owner or operator having a leasehold, or working interest ownership
either directly or diagonally offsetting any quarter section upon which said drilling
operations are proposed to be conducted. This letter constitutes formal written
notice of our intent to drill Granite Point 55 well, as required under said
regulations.
Enclosed are copies of the Permit to Drill applications for your reference. A copy
of a plat showing all of the wells within one-half mile of any portion of the new
wells, and a lease map showing current ownership for the affected leases.
As a working interest owner in these wells, you will receive an AFE for your
participation, if you have not already done so.
Sincerely,
UNION 0IL COMPANY OF
CALIFORNIA. d.b.a. UNOCAL
Landman
Enclosures: Copy of Well Permit
Cc: AOGCC
STATE OF ALASKA
\SKA OIL AND GAS CONSERVATION('-
PERMIT TO DRILL
20 AAC 25.0O5
MMISSION
la. Type of work Drill ~ Redrill
Re-Entry E] Deepen
lb. Type of well.
Service
--xploratory~ Stratigraphic Test E~
Development Gas E~ single Zone-"]
Development OiI~]
Multiple Zone-~
2. Name of Operator
Union Oil Company of California IUnocal)
3. Address
P.O. Box 196247, Anchorage, AK 99519
4. Location of well at sudace Granite Point Pltf. Slot 4, Condr 1
2,437' FNL, 1,303' FWL, Sec 13, T10N, R12W, SM
At top of productive interval 15,141'
50' FSL. 11,00' FWL. Sec 23, T10N, R12W, SM
At total depth 18,141'
2,350' FNL. 500' FEL, Sec 27, T10N, R12W, SM
12. Distance to nearest
property line
5O
feet
13. Distance to nearest well
See Clearance Report
16. To be completed for deviated wells
Kickoff depth 1,9oo feet Maximum hole angle
18. Casing program !
size Specifications
Hole Casing1 Weight Grade
17-1/2" 13-3/8"1 68 K-55
12-1/4" 9-5/8" I 47 L-80
29 P-110/L-80
8-1/2"
6"
15 L-80
Coupling
BTC
BTC
TKC BTC
SC-BTC
feet
5. Datum Elevation (DF or KB)
114.75 RKB feet
6. Property Designation ADL 18761
ADL 374044 & 374045
7. Unit or property name
Granite Point Field
8. Well number
GP #55
9. Approximate spud date
7/15/97
14. Number of acres in property
10209
10. Field and Pool
Granite Point Field
Middle Kenai "C" Sands
11 .Type Bon (SEE 20 ACC 25.,
AK Statewide Oil & Gas Bond
Number
U62 - 9269
Amount
$200,000
15. Proposed dep' (MD and TV
18,060'/10,735' feet
17. Anticipated Pressure (see 20 AAC 25.035 re)(2))
79 Maximum surface psig At total depth fTVDI 986
I Setting Depth
Top Bottom
I Lengthi MDI TVDt MDI TVD
1,053 t 47 I 47 I 1100 { 1100 2500ft3
4.453t 47147 1450oI 4~4e 3383ft3
15,0831 47 147 115130 I 1O113 500ft3
19. To be completed for Redrill, Re-entry, and Deepen Operations
Present well condition summary
Total depth: measured feet
true vertical feet
psig
Plugs tmeasured)
Quantity of cement
Effective depth: measured feet
true vertical feet
Junk (measured)
Casing
Structural
Conductor
Sudace
Intermediate
Production
Uner
Pedoration depth: measured
true vertical
Length Size Cemented
294' 26" Driven
See attached
See attached
Measured depth True vertical depth
294'
;~aska 0]]~ Gas Cons. Comm'~ssior~
Ancho~ag~
20. Attachments Filing fee ~] Property plat ~ BOP Sketcl~ Diverter SketchE]
Drilling fluid program I~ Time vs depth plot ~ Refraction analysis'-] Seabed report E]
21. I hereby certify that the foregoing ~s true and correct to the best ot my Knowledge
·
Signed l ~(~_(..~.' (_. ~, I ~ 'Frtle Drilling Manager
Drilling program ~
20 AAC 25.050 requlrementsE]
Date 07/1/97
Hermit Number
Commission Use Only
I AHI50. number ] Approval date
See cover letter
for other requirements
Conditions ot approval Samples required [--'J Yes E] No Mud log required E] Yes E] No
Hydrogen sulfide measures ['"] Yes E] No Directional survey required E~ Yes E] No
Required worKing pressure tor BOPE E] 2M; [-'] 3M; C 5M: E] 10M; E} 15M
Other:
by the order of
Approved by Commissioner the commission
Date
Form 10-401 Rev. 12-1-85 Submit in triplicat,
1997 GRAN"TE POINT DRIi'LING PROGRAI~
C-5 STRUCTURE MAP
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Miteh Damm Date: 6/14/97 Revision #2
Estimate for Grass Roots Oil Well.
UNOCAL
Estimated
Date
No. 'Preliminary. Procedure : Time i CUM CUM Depth Depth
Estimate Time Time In Out
(Hours) (Hours) (Days) (Feet) (Feet)
Move and prep rig.
Change out liners
Skid rig over slot 4-4.
Cut open conductor and weld squineh joint to producition deck.
Cuttings line rerouting. Extra time required due to piping configuration.
Clean pits.
Install Riser and Bell Nipple.
Total Rig Mobilization. 42.0 42 1.8 294
I 42 1.8 294
17-1/2" Hole Section 42 1.8 294
I PU 5" drillpipe, drill collars, and HWDP 14.0 56 2.3 294
2 MU BHA#1 3.0 59 2.5 294
3 RIH. Circulate well clean. 2.0 6 i 2.5 294
4 RU scientific. Gyro Conductor. 4.0 65 2.7 294
5 Rotary drill from 294' to 1,100' taking single shot surveys. 15.0 80 3.3 294 1,200
6 Cire and condition hole. 1.0 81 3.4 1,200
7 POOH with BHA #1. !.5 83 3.4 i,200
..... 8 LD BHA. 2.0 85 3.5 1,200
9 RU CasingCrew 2.0 87 3.6 1,200
10 RIH with 13-3/8" Casing to 1,100'. 5.0 92 3.8 1,200
i I PU wellhead and land wellhead. 1.0 93 3.9 1,200
12 RU to pump cement I 2.0 95 3.9 1,200
13 Pump cement job taking returns to surface. 4.0 99 4.1 1,200
14 Release and LD running tools. RD cemennng Eq. 2.0 101 4.2 1,200
15 LD riser. Cut off squinch joint. 3.0 104 4.3 1,200
16 NUXOspooi, riserand 13-5/8"BOPE. 10.0 114 4.7 1,200
17 Test BOPE. 4.0 118 4.9 1,200
118 4.9 1,200
12-1/4" Hole Section 118 4.9 1,200
18 MU BHA #2. (MWD and Motor~ 4.0 122 5.1 1,200
19 RIH with BHA. 2.0 124 5.1 1,200
20 Drill cement. Test casing. 1.5 125 5.2 1,200
21 Drill out of shoe and perform teak-offtest. 2.5 128 5.3 1,200
22 Drill 12-1/4" hole f/1,100' to 5,000'. 80.0 208 8.6 1,100 5,000
23 CBU and condition hole 2.0 210 8.7 5,000
24 POOH with BHA. 3.0 213 8.9 5,000
25 LD BHA. 2.0 215 8.9 5,000
26 Change pipe rams and test BOPE. 2.0 217 9.0 5,000
27 RU casing crew 1.5 218 9.1 5,000
28 RIH with 9-5/8" casing. 10.0 228 9.5 5,000
29 Land hanger and circulate 1.0 229 9.5 5,000
30 Pu. mp Cement Job 5.0 234 9.8 5,000
31 Release running tool. RIH with wash took 2.5 237 9.9 5,000
32 RIH with CSG hanger packoff, t 5.0 242 10.1 5,000
15-Jul-!
16-Jul-!
16-Jul-!
16-Jul-'
17-Jul-'
17-Jul-'
17-Jui-
17-Jul-
18-Jui-
18-Jul-
18-Jul-
18-Jul-
18-Jul-
18-Jul.
18-Jul.
18-Jul.
19-Jul.
19-Jul.
19-Jul.
19-Jul
19-Jul
19-Jul
19-Jul
20-Jul
20-Jul
20-Jul
20-Jul
23-Jul
23-Jul
23-JU
23-Ju
24-Ju
24-Ju
24-Ju
24-Ju
24-Ju
24-Ju
25-Ju
GP55 AFE est 2.XLS Page 1 of 6 711197
Unocal Alaska Business Unit
Granite Point Platform
Well 055
Prepared by: Mitch Damm Date: 6/14/97 Revision ~2
Estimate for Grass Roots Oil Well.
UNOCAL
No. Preliminary. Procedure ; Time CUM CUM Depth Depth
I Estimate Time Time I Out
n
I (Hours) (Hours) (Days) (Feet) (Feet)
33 IRun wear bushing ! 0.5 242 10.1 5,000
!
I 10.1 5.000
8-1/2" Hole Section I 242 10.1 5,000
34 Clean pits for OBM and transfer OBM from Beam tanks.: 7.0 249 i 0.4 5,000
35 Change Rams. Test BOP's I 4.0 253 10.5 5,000
36 MU BHA g4 i 4.0 257 10.7 5,000
37 R.IH with BHA [ 3.0 260 10.8 5,000
38 Drill Cement and pressure test easing i 3.0 263 11.0 5,000
39 Drill out of shoe and l~erform leak offtest, i 2.0 265 11.0 5,000 i 5,010
40 Drill 8-1/2" hole. ! 125.0 390 16.3 5,010 I I0,010
41 CBU. i 1.0 391 16.3 10,010
42 POOH with BHA. I 6.0 397 16.5 10,010
43 BHA handling. I 3.0 400 16.7 10,010
44 Cut and strip drilling line. 1.0 401 16.7 10,010
45 Routine Rig Maintenance 1.0 402 16.8 10,010
46 Test BOPE. 5.0 407 17.0 10,010
47 RIH with BHA 4.0 411 17.1 10,010
48 Ream to bottom. 2.0 413 17.2 10,010
49 Drill 8-I/2" hole 84.8 498 20.7 10,010 12,300
50 POOH ] 8.0 .506 21.1 12,300
51 BHA Handling I 2.0 508 21.2 12,300
52 R. IH with BHA I 5.0 513 21.4 12,300
53 Ream to bottom. ] 2.0 515 21.5 12,300
54 .Drilling 8-1/2" hole. i 88.9 604 25.2 1'2,300 t 13,900
55 POOH I 9.0 613 25.5 13,900
56 B.H.A Handling i 2.0 615 25.6
13,900
57 RIH with BHA t 6.0 621 25.9 13,900
58 Ream to bottom. 3.0 624 26.0 13,900
59 Drilling 8-1/2" hole. 76.9 701 29.2 13,900 15,130
60 Circulate bottoms up. 2.0 703 29.3 15,130
61 POOH I 10.0 713 29.7 15,130
62 Change pipe rams and test. Pull wear bushing i 3.0 716 29.8 15,130
63 RU casing crew I 3.0 719 29.9 15,130
64...Run 7" casing , 24.0 743 30.9 I 15,130
65 Land hanger and RU cementing equipment. I 2.0 745 31.0 t 15,130
66 :P.ump cement job. i 6.0 751 31.3t 15,130
t t
67 Release running tool. RIH with wash tool. ] 1.0 752 31.3 ! 15,13,0
68 RIH with CSG hanger paekoff. [ 2.0 754 31.4 I 15,130
69 Run wear bushing i 1.0 755 31.4 15,130
70 Lay down 5" drillpipe. Prepare for 8.2 PPG OBM. i 18.0 773 32.2 f .. 15,13_.0.
71 PU 3-1/2" drilpipe I 22.0 795 33.1 ! 15,130
i 33.1 i 15,130
6" C-5 Lateral i 14.0 otai HR~ 33.1 ~ 15,130
Estimated Bit Performance ~
= ~ 160.0 Total FT 33.1 t 15,130
Estimated
Date
' '25.Jul.C~
25-Jul-~
25-Jul-C~
25-Jul-C~
25 -Jul-r,
25-JuM
25 -Jul-!
25 -Jul-~.
26-Jul-!
3 l-Jul-!
3 l-Jul-!
3 l-Jul-!
31-Jul-'
3 l-Jul-'
31-Jul-
3 l-Jul-
l-Aug-
1 -Aug-
4-Aug-
5-Aug-
5-Aug-
5-Aug.
5-Aug-
9-Aug.
9-Aug.
9-Aug.
9-Aug
9-Aug.
13-Aug
13-Aug
13-Aug
13-Aug
13-Aug
14-Aug
15-Aug
15-Aug
i 5-Aug
15-Aug
15-Aug
~ 16-Au~
17-Au~
17-Au!
17-Au!
17-Au!
GP55 AFE est 2.XLS =age 2 of 6 7/1/97
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Preparedbv: MitchDamm Date: 6/14/97 Revision#2
UNULAL
Estimate for Grass Roots Oil Well.
No. Preliminary Procedure Time CUM CUM Depth Depth
Estimate Time Time In Out
(Hours) (Hours) (Days) (Feet) (Feet)
II I
71 MU BHA 3.0 798 33.2 15.130
72 RIH wixh BHA. 6.0 804 33.5 15.130
73 Drill cement and pressure test casing. 3.0 807 33.6 15.130
74 Drill lO"of'formaUon and perform LOT. 2.0 809 33.7 15,130 15.140
75 Change overto 8.2 PPG OBM. 4.0 813 33.9 15.140
76 Drill 6'~hole 14.0 827 34.4 15,140 15.360
77 POOH 5.0 832 34.6 15,360
78 BHA handling. 2.0 834 34.7 15.360
79 RIH wi~:h BHA. 6.0 840 35.0 15.360
80 Ream ~ bortorn. !.0 S41 35.0 15.360
81 Drill 6'"lh~lte 14.0 855 35.6 15,360 15,520
82 POOH 5.0 860 35.8 15,520
83 BHA handling. 2.0 862 35.9 15,~20
84 RIH w~ BHA. 6.0 868 36.1 15,520
85 Reams,bottom. 1.0 869 36.2 15,520
II
86 Drill 6'" ~hole 14.0 883 36.8 15,520 15,680
87 POOH 5.0 888 37.0 15,680
88 BHA h~, Oling. 2.0 890 37.1 15,680
89 RIH w~i;~hBHA. 6.0 896 37.3 15,680
90 Ream~to bottom. 1.0 897 37.4 15,680
91 Drill 6~'''hole 14.0 911 37.9 15,680 15,840
9'2 POOH 5.0 916 38.1 15,840
, ,
93 BHA handling. ._ 2.0 918 38.2
15,840
94 RIH with BHA. 6.0 924 38.5 15.840
95 Ream ~o bottom. 2.0 926 38.6 15,840
,
96 Dril} 6~ hole 14.0 940 39.1 15,840 16.000
97 POOIH' 5.0 945 39.4 16,000
~'8 B,HA handling. " 2.0 947 39.4 16,000
93 RIH~'~ BHA. 6.0 953 39.7 16.000
100 Ream ~ lbottom. 2.0 955 39.8 16,000
101 Drili~"' hole 14.0 969 40.4 16,000 16,160
102 POOH 5.0 974 40.6 16,160
103 BOP Tc~xt a.0 978 40.7 16,160
104 ,BHA ~nar~dh:hg. 2.0 980 40.8 16.160
105 RIH,with BHA. 6.0 986 41.1 16,160
106 Ream}m bottom. 2.0 988 41.1 16,160
,
107 Drill. G" !h~ole 14.0 1002 41.7 16,160 16,320
108 Pooch ' 5.0 1007 41.9 16,320
109 BHA,'handling. 2.0 1009 42.0 16,320
110 RIH ~,i~th BHA. 6.0 1015 42.3 16.320
lil R'eam ito ;bottom. 2.0 1017 42.4 16.320
112 Driil ~6" hole. ! 4.0 1031 42.9 16,320 16.480
113 POO;.H 5.0 I036 43.1 I 16.480
114 BHAil~'andling. '" 2.0 ,i 1038 43.2i 16,480
Estimated
iDate
17-Am,-97
-
17-Aug-97,
17-Aug-9~
17-Aug-9~
17-Aug-9'
18-Aug-9'
18-Aug-9'
18-Aug-9'
18-Aug-9'
19-Aug-9'
19-Aug-9
19-Aug-9
19-Aug-9
20-Aug-9
20-Aug-9
20-Aug-9
20-Aug-9
21-Aug-9
21-Aug-9
21-Aug-9
21-Aug4
22-Aug-5
22-Aug-C/
22-Aug-~
22-Aug4
23-Aug4
23-Aug4
23 -Aug-!
23 -Aug-!
23 -Aug-!
24-Aug-!
24-Aug-!
24-Aug-'
24-Aug-'
25-Aug-
25-Aug-
25-Aug-
25 -Aug-
26-Aug-
26-Aug-
26-Aug-
26-Aug-
27-Aug.
27-Aug.
GP55/AFE est 2.XLS Page 3 of 6 7II/97
Unocal Alaska Business Unit ~
Granite Point Platform
Well #55
Prepared by: MitchDamm Date: 6/14/97 Revision#2 UNOCAL~
Estimate for Grass Roots Oil Well.
No. t Preliminary Procedure Time CUM CUM Depth Depth
I Estimate Time Time In Out
I (Hours, (Hours,I (Days) (Feet) (Feet!
115 RIH with BHA. 6.3 1044 i 43.5 16.480
116 Ream to bottom. 3.0 1047 'i 43.6 16,480
117 Drill 6" hole. 15.0 1062 i 44.2 16,480 16,640
118 POOH 5.3 1067 1 44.5 16,640
119 BHA handling. 2.0 1069t 44.5 16,640
120 RIH with BHA. 6.3 1075 ! 44.8 16.640
121 Ream to bottom. 3.0 1078 I 44.9 16,640
122 :Drill 6" hole. 15.0 1093 i 45.6 16,640 16,800
123 POOH 5.3 1099 I 45.8 16.800
124 BHA handling. 2.0 1101 I 45.9 16.800
125 RIHwith BHA. 6.3 1107 I 46.1 16,800
126 Ream to bottom. 3.0 1110 ! 46.2 1
6,800
127 Drill 6" hole. 15.0 1125 I 46.9 16,800 16,960
128 POOH 5.3 1130! 47.1 16,960
129 BHA handling. 2.0 !132 47.2 16,960
130 RIH with BHA. 6.5 1139 47.4 16,960
131 Ream to bottom. 3.0 1142 47.6 16,960
132 Drill 6" hole. 15.0 1157 48.2 16,960 17,120
133 POOH 5.5 1162 48.4 17,120
134 IBHA handling. 2.0 1164 48.5 17,120
135 R,IH with BHA. 6.5 1171 48.8 17,120
136,. Ream to bottom. 3.0 1174 t 48.9 17,120
137 Drill 6" hole. 15.0 1189 [ 49.5 17,120 17,280
138 BOPtest 4.0 1193 I 49.7 17,280
139 POOH 5.5 1198 t 49.9 17,280
140 BH^ handling. 2.0 1200 50.0 17,280
141 RIH with BHA. 6.5 1207 50.3 17,280
142 Ream to bottom. 3.0 1210 50.4 17,280
143 Drill 6" hole. 15.0 1225 51.0 17,280 17,440
144 POOH 5.5 1230 51.3 17,440
145 BHA handling. 2.0 1232 51.3 17,440
146 ~RIH with BHA. 6.5 1239 51.6 17,440
147 IReam to bottom. 3.0 1242 51.7 17,440
148 Drill 6" hole. 15.0 1257 52.4 17,440 17,600
149 POOH 5.5 1262 52.6 17,600
150 BHA handling. 2.0 1264 i 52.7 17.600
151 RIH with BHA. 6.5 1271 ! 52.9 17.600
152 Ream to bottom. 3.0 1274 53.1 17,600
153 Drill 6" hole. 15.0 1289 53.7 17,600 17.760
154 POOH 5.5 1294 53.9 17,760
155 BHA handling. 2.0 1296 54.0 17,760
156 RIH with BHA. 6.5 1303 54.3 17,760
157 Ream to bottom. 3.0 1306 i 54.4 17,760
158 ~Drill6" hole. 15.0 [ 1321~ "55.0 17,760
Estimated
Date
27-Aue-9'
·
27-Aug-9'
28-Aug-9'
28-Aug-9'
28-Aug-9
28-Aug-9
28-Aug-9
29-Aug-9
29-Aug-9
29-Aug-9
30-Aug-9
30-Aug-9
30-Aug-9
31-Aug-C~
3 l-Aug-C~
31 -Aug-~
31 -Aug-S
I -Seo-~
I -Sep-~.
1 -Sep-!
1 -Sep-!
1 -Sep-!
2-Sep-!
2-Sep-'
2-Sep-'
3-Sep-'
3-Sep-
3-Sep-
4-Sep-
4-Sep-
4-Sep-
4-Sep-
4-Sep-
5-Sep-
5-Sep-
5-Sep.
5-Sep.
6-Sep.
6-Sep.
6-Sep.
7-Sep
7-Sep
7-Sep
8-Sep
GP55 AFE est 2.XLS ?age 4 of 6 7/1/97
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Mitch Datum Date: 6/14/97 Revision
Estimate for Grass Roots Oil Well.
UNOCAL
No. 'Preliminary. Procedure Time CUM CUM Depth Depth
Estimate Time Time In Out
(Hours) (Hours) (Days) (Feet) (Feet)
I
159 POOH 5.5 1326 55.3 17,920
160 BHA handling. 2.0 1328 55.3 17.920
161 RIH with BHA. 6.5 1335 55.6 17.920
162 Ream to bottom. 3.0 1338 55.7 17.920
163 Drill 6" hole. 15.0 1353 56.4 17,920 18,080
164 CBU 3.0 1356 56.5 18,080
165 POOH with BHA I0.0 1366 56.9 18,080
166 LD motor and MWD 4.0 1370 57.1 18,080
167 RU SWS WLU for DP conveyed logs. 2.0 1372 57.1 18,080
i68 ,RIHwithloggingtoois: DIL, FDC, CNL, DT. GR, CCL 8.0 1380 57.5 18.080
169 Install side door entry, sub. RIH with wet connect. 8.0 1388 57.8 18,080
170 Log C-5 8.0 1396 58.1 18.080
171 ND side-door entry sub. POOH with wireline 3.0 1399 58.3 18,080
172 POOH with logging tools 9.0 1408 58.6 18,080
173 I~U casing crews for 5" liner 1.5 1409 58.7 18,080
174 RIH with 5" liner 5.0 1414 58.9 18,080
175 Continue to RIH with 5" liner on drilipipe 9.0 1423 59.3 18,080
,!
176 Circulate and condition hole for cement. 3.0 1426 59.4 18,080
,
177 RU for cement job. 1.0 , 1427 59.5 18,080
178 Pump cement job and set liner hanger. 4.0 1431 59.6 18,080
179 POOH and circulate out cement. Continue to POOH. 7.0 1438 59.9 18,080
180 MU 6" bit and 7" casing scraper. 1.0 ! 439 60.0 18,080
181 RIH with 7" cleanout assembly. 6.0 1445 60.2 18,080
,
182 Wash and drilli cement to liner top. Circuaite hole. 2.0 1447 60.3 18,080
183 POOH. 7.0 1454 60.6 18.080
184 LD BHA. PU mflI and 5" casing scraper. 2.0 1456 60.7 18,080
185 RIH with 7" cleanout assembly. 8.0 1464 61.0 18,080
186 Wash and drilll cement to liner top. 3.0 1467 61.1 18,080
187 Circulate hole clean, 6.0 1473 61.4 18,080
188 RU and test 5" liner lap. 2.0 1475 61.5 18,080
189 Change well over to diesel. 8.0 1483 61.8 18,080
190 ;Transfer OBM. 1.0 1484 61.8 18,080
191 Clean mud pits. 5.0 1489 62.0 18.080
192 POOH with cleanout assembly. 10.0 1499 62.5 18,080
193 LD 2-7/8" DP and drill collars. 3.0 1502 62.6 18,080
~ 1502 62.6 18,080
Perforate 5" Liner and Run 3-1/2" Gas Lift completion. 1502 62.6 18,08'0"
194 PU 3-3/8" TCP guns and jewerty. 3.0 1505 62.7 l 8,080
195 RIH with TCP guns on 3-I/2" DP. 10.0 1515 63.1 18,080
196 Setpacker. RU surface EQ. Fire guns. Circulate Well. 4.0 1519 63.3 18,080
197 POOH with TCP Guns v.~,,} 5Z' (7 t5 'i'\,~" ¢ ...... i) 10.0 , 1529 63.7 18.080
198 LDTCPGuns ':i\ ~''' ~;''' ~ ...... "': .... 5.0 1534 63.9 18.080
,
199 RU SWS WLU .... ~ '~cL'~'? 1.5 1536 64.0 18.080
,
200 I PU packer and tail pipe. ....i LJ '[.- ~''~ L.: ~,,,, ~ ~ 1.0 1537 64.0 18,080
,,,
GP55 AFE est 2.XLS
Estimated
Date
8-Se?-9r
8-Sep-9':
8-Sep-9r
8-Sep-9-
9-Sep-97
9-Sep-9-
9-Sep-9'
10-Sep-9'
10-Sep-9'
10-Sep-9'
10-Sep-9'
l l-Sep-9'
1 l-Sep-9'
l l-Sep-9'
l l-Sep-9'
1 l-Sep-9
12-Sep-9
12-Sep-9
12-Sep-9
12-Sep-9
12-Sep-9
12-Sep-9
13-Sep-9
13-Sep-9
13-Sep-9
13-Sep-~
14-Sep4
14-Sep-[
14-Sep-t;
14-Sep4
14-Sep4
14-Sep4
15-Sep-!
l 5-Sep-!
15-Sep-!
15-Sep-!
15-Sep-!
15-Sep-~
16-Sep-'
16-Sep-
16-Sep-
16-Sep-
16-Sep-
17-Sep-
711197
Un'cai Alaska Business Unit
Granite Point Platform
Well 055
Prepared by: MitchDamm Date: 6/14/97 Revision#2 UNOCAL~
Estimate for Grass Roots Oil Well.
No, Preliminary Procedure Time CUM CUM Depth Depth
Estimate Time Time In Out
(Hours) i (Hours) (Days) (Feet) (Feet)
I
201 RIH with .~acker and set on wireiine. 6.0 i 1543 64.3 18,080
202 POOH 2.5 ~, 1545 64.4 18,080
203 RD SWS WLU. 0.5 ! 1546 64.4 18,080
204 ,RU to run 3-1/2" completion. ! .0 i 1547 64.4 18,080
205 PU, rabbit and run 3-1/2" ga~ lift commetion. 16.0 i 1563 65.1 18,080
206 Space out. instail SCSSV, control line. and PU hanger. 6.0 i 1569 65.4 18,080
207 L~nd hanger and install packoff. 1.0 i 1570 65.4 18,080
208 ND BOPE. 4.0 i 1574 65.6 18.080
209 Install 3-1/8" block tree and test. 4.0 : 1578 65.7 18,080
210 RU slicktine. RiH and puli SCSSV sleeve. 2.0 1580 65.8 t 18.080
211 Turn well overto Production. 0.0 ', 1580 65.8 I 18.080
i 1580 65.8 18,080
I
212 LD drilloipe ana load out eq. on boat. 24.0 t 1604 66.8 18,080
213 Demob Rig 24.0
i 1628 67.8 18,080
Estimated
Date
17-Set~-97
i
17-Sep-97
17-Sep-97
17-Sep-97
18-Sep-97
18-Sep-97
18-Sep-97
18-Sep-97
18-Sep-9-
18-Sep-9-
l 8-Sep-9'
18-Sep-9'
19-Sep-9;
20-Sep-9~
20-Sep-9'
GP55 AFE est 2.XLS Page 6 of 6 7/1197
UNOCAL
Grantie Point Field Well #55
Depth vs. Time Summary
1,000
2,000
3,000
4,000
6,000
7,oo(!
8,000
9,000
0,000
I 1,000
12,000
13,000
14,000
15,000
16,000
17~(}(1(}
18,000
0 5 10 15 20 25 30 35 40 45 50 55 6{} 65 70
Time (Days)
UNOCAL ..
[
RKB = 115': 43.44' Rig Floor to Wellhead
Kvaerner SMS Wellhead
8
G~.NITE POINT PLATFORM
WELL # 55
PROPOSED COMPLETION'
CASING AND TUBING DETAIL
SIZE XVT GRADE CONN
33" Outside conductor
26" Inside Conductor
13-3/8 68 K-55 BTC
9-5/8 47 L-80 BTC
9-5/8 53.5 ?-110 BTC
7" 29 P-110 TKC-BTC
7" 29 L-80 TKC-BTC
5" 15 L-80 SC-KC-BTC
Baker 5" HMC liner hanger @ 14.800'
3-1/2" 9.2 L-80 SC BTC
TOP BOTTOM
47 229
47 294
47 1,100
46 73
73 4.500
45 6,000
5,960 15.130
14,800 18.141
44 14.820
JEWELRY DETAIL
NO. ITEM
DEPTH
6
'FOL @ 14.800' 7
8
Kvaerner Tubing Hanger 44'
(AB TC-4S Up X STD V AM DWN3
3.6' STD VAM x Buttress Pup JT
HES XXO Safety Valve Landing 300'
Nipple {ID = 2.813")
McMurry-MACCO SMd-1 Gas Lift Mandrels with
1-1/2" Valves:
HES Seal Assembly with Nitrile/Flourel
molded seals
HES Packer
HES "X" Nipple ID = 2.813"
Wireime Muleshoe Re-entry Guide
C-5 SAND
PDTD = 18.060
MAX HOLE ANGLE = 79° @ 15.477'
O:kDRILLING\SCHEMATIC\GP\GPI~Gp55 prop l.doc
PERFORATION DATA
TOP BTM ZONE SPF DATE COMMENTS
15.130 18.141 C-5 6 TCP
REVISED: 6/25/97
DRAWN BY: MW
UNOCALe
C,,¢oteo ay .ann
Reference ~s
.
-?-ucture : GRANITE POINT Platform
Field : Granite Paint Field
8100 7200 6300
W
..... '3oint .....
,',e on C.OO
iena ol Halo
'-Cnd Of 8udO
ich8 of Homo 7~0.~
tEnO of Oroo/Tum
OP ~ g~.~
Contmue rum 2 ~c2.gg
'orqet GP§5 (:5 Rvsa 11 '5'.~',7~-
:'n~l of 8u,lCl/'r~.rn '5477.22
'D & Torae[ Ga?, TO R ~'&: 23
ELL PROFILE DATA
0.00 8.DC ~.OO 3.00 3.00 ':.~
0,~ 8~ ~50.00 ~.00 0.~
2,~ 8~ 54g.g6 3.46 0.4g -5.13
2.~ 8.~ 7~g.84 '0.37 ~.~6 -g.3g
0.~ O~ g4g,Bo 13.82 ~ g4 -~2.~
2,50 ~0.~ ~ ggg.77 ~ 5.87 ~ .20 - ~ ~,~
5,~ 330.~ 2102.5~21,87 -1.82 -1705
55.~ 200.~ ~128.79-892.2~ -4~6.98 g7?,6g
55.~ 200,~ 5043.10-2160.27-888.51 22B5.~
55.~ 2~9,795966.80- ~324.68 -~ 557.913624,4g
~5,~ 2~g 7;'C~ 15.00 -802g.g4-5476.51 g7~g.67
79.41
7941 2'36~ ' C735,00 - 104{&.O~ -711718 12655.05
900 -
we l : G=55
Location : C::k inlet.
0c9/1001
0.001
1
0.00t
~ gOI
O,OOl
2.501
2.50i
2,501
,3 OOl
·
2001
?
2 O01
<- West (feet)
5400 :~.C0 3600 27C0 ' 800 900 C ~00
~egin D'nl Nudge~) C
~ 5/8Casing ~/~ EOC
/
- 45C2
'.00Req,n O'nl Nuoce
Enc~ Angle 8uila'
~;~[ ~ ~n eeain Anaie
Efl~' O'nF NuOg~ 72(:0
'3 3/8 Cos,ng Pt
[ ~ T~;ET- 7 Casing Pt t 8100
~ ;~ rina, EOC/
~ 9,77 OLS: 2.50 eec ce 100 ft
~ '~ 52 '
Beg,n %rn to~ =5 7g
~ ' ·55.54 DLS: 1.00 deg Der 100 ft
~ ~'~" ~15.20, Azimuth
TANGENT ANGLE
55.88 DEC
~ ~ ~ .... Commission
TARG~ - - g:~in9 Pt
goo ~
! 800
2700
}600 -
~500 -
5400
6300
7200
8~00
900C -
9gO0 -
:C800 q
TARGET ANGLE
79.41 DEG
' ' 7C3 '
- 900 : 800 i-~.C 5600 ~500 5400 6300 7200 5. CO gO00 ggCO '0800 11700 12600 15500
Vertical Section (feet)->
Azimum 214.29 with reference 0.00 N, O.CO E from stat ~4-1
Slructura : GRANITE PO:NT =lot~'orm
Well : 0.,1:55
UNOCAL
F;e~c : ',Sranite Poimt Fieid Location : Cook inlet, A.osko
East (feet) -:>
70 -22 ~0 ~3 l: 2C ' C ~ ' g 20 20 ~0 :-'2 50 ~g ~.~ 90
~ " "' " / ~ ~c~ ' 900 / ~ 700 t ',
· ' / , ~30 ~ ' ,
4~, .4 /
" lOO
?O 4 /'
~C H
'COq
'2C !
7C
70
60
50
4.0
3C
20
~0
0
~0
20
gCC, , gOO
',,
',,
', 1500
' .~00
"'icc
',- 70
8O
- ~00
~20
o
c
Structure : GRANITF POINT ='='form ',Ve~l : ";,=55
Fieid : Granite Point F;e,c _=caticr : :cck .n~et. Alaska
UNOCALe
<- Wes: {feet)
''' 2~0 'SQ 2~0 220 22: '~0 '60 '-',: '20 'CO ~0 50 ':C:~ 20
4
,,/~ 7CC / ,' ?.
tl , i -
~cO -~ 7CO
, ' / .... L
,,,'
i 1 gO0 ,/"'
'"
'~ ' ,,/ t ,."
t ,
2~Oq 25C~ _
2~0 - ~2C0 ,'""'"' ~2,, ," /
,' / / /'
!2C ~ ,'., ,,,,,. ~ ~C/~/6500
. / 2500 ~ 5C0~",/"
/
J2C ~
~ ,,
26C '. ~ ~
~70 '-' 2SO 25~ 2~0 /~/g20 2.:: 'SO '~C ':C :20 ~0
<- Wes,', (feet)
'co
120
~,~0 0
~
,/
220
2~.0
260
28O
C-truc'ura : GRANITF POINT Platform
,~e,I : GP55
UNOCAL )
-"eid: Granite Point Field _=:atiom : ;¢ok inlet. A:aska
280 'q
.4
550 .~
680 ~0 5;0 552 520 aSO 4~0 aCC 150 iZ: 2EO 240 ZCO :60 '20 ~C
, Z'SO
/
/
<- West (feet)
900
/
.,,'
/3500
/
/
- ~.80
- 520
- 560
.
- 5C0
-
- 580
720
- '760
_
- 800
-
- ~*0
- BBO
- ~20
- ' CO0
, i ,
2~C 2CO ; 60 ~ 2C ~C
T, OCAL
UNOCALe
S/ruc'~.ra : GRANIT[ POINT ='ctform
Well : GP55
r'-.JCl : Granite Point r;eid LocQtion : Cook role'. A,aska
o e~
2200 2~C0 2800 2520 2~,:g 2200 2CeO ' gOO ' 5C0 ~aO0 ' 200 '
· coo -J ~ ~..%, ~ ~:00/'5303,
~2oo~ ~~0~,o~ ~ *sOO/ Z../" / .," / ~20o
I ~ :o~oo ~ /
~ ' 5300 ," '.
~ ~ / / ' / / ' / ,: '- ' 600
~oo~ / / /~ ,,, /~oo ~o~o
," , 6500 ,
F 24a0
240a ,," '
///
,, ,
- ~=~ ,,.
~ I ,," / "7300 '.
o ~ / ~o / ,,.' __/-
.... /
I 7 /~--- ,/7300 .'" ~ -
~oo~ :~9~'oo /~-.,.'
~ /~.% / .." ~c // -
· ~oo %~ %/- ~o~/- -- //-"
~/ ~ / //
~ ~930o ~600
~200 2200 2300 ~250C 2~ 23 2200 2C00 ' 800 : 6ca ~ ~co
C- West (feet)
:Sfruc:ura : GRANITE PO;NT : 3tform
F;eld : '~ranite Point r'e~cl
Well : GP55
Locaticn : Cook inlet. Alaska
UNOCAL$
'-C'.O ',
~2C0
· ~-CO ~,
'-600 -~
· 800 -,
~
.
~2CC -t
56C0 .~
~ 55,20 -.
~ 6CCC -~
0
.,
· 4- Wes~ (fee~)
5200 -~CO0 ~8CO ~600 ~00 ~2C0 ~' :0 ~ECO ~500 ~00 ~200 3000 2800 ZSCO Z~:: 2200
' ; ~ ~ ~ ~ ~ ~O00
6soo~ ~9~-
~o / ,'/ ~oo -
/ -
, 5200
F 5400
,~ ~ 5600
- ~ooo
5200
. ~/~900
6~.C0 - ,' ,' - 6400
Ci O0 ,'""
6800 ~ 6800
~ ,
,'
,
'
7200 ~ ,,,' 2 7000
- ."~300 -
,
'200 - ., / - 7200
,,'
- ~
~ ~O~CO
'~CC ~ ,' - 7400
. '~ 700
L 7600
~600 ~ ..' ~'~
,
,
,
'8CC - - 7800
52C0 ~.O00 ~800 ~600 ~CO ~200 ~ ] '.; 3800 3500 ~&O0 3200 3000 2800 2500 2" ,;C 2200
<- West (feet)
St.'uc.'ura : GRANITE POINT =!atform
,Yell : GF55
UNOCAL )
F;eld : Granite Point Fieid L:~cat~c~ : Cook .nlet. AlasKa
29C
280
~3G
34O
7G
27C0
2 0/'
30
27" 70 ~.i-~ 5:E
\\
0
/
~0
5O
?,'0 '~ "9 ~,u 5!0 6iO 7!C
, 2'C.O
;
!50
.... 'ncer
.a,i z=z','sS s,'"Own c"e Measure¢ ~="r~'s Or' :eferer'ce A'e!~,
~.!ruc;ure : (:;RANIT~' PC NT Platform ',Veil :
?ield : Oranife Po~-.t Field Location : Coc~ met. Ala$~<c
UNOCAL
7O
8O
'i0
2300
9C
240 ~ x~ ! 20
/
/
/
/
/
/
/
tgco /
/
1'2' :C ,/' /
i
~
i ~ 700
t
~: 50C/
150
I 9oo
1
, ,
'5O
, ~ ....... C e V'/e
TRDCAL
GRANITE POINT Pla=~orm
slot #4-1
Granite Poin= ~ield
Cook Inlet, Alaska
PROPOSAL LISTING
Baker Hughes INTE~
Your re~ : GP55 Version #2
Our re~ : prop2063
License :
Date printed : 27-Jun-97
Date crea=ed : 12-Feb-97
Las= revised : 12-Ju~-97
Field is ten=red on n60 59 36.711,w151 18 33.112
S~r~c=ure is ten=red on n60 57 $2.74~5,w151 20 20.066
Slo= loca=ion is n60 57 28.961,w151 19 53.805
Slo= Grid coor~ina~es are N 2544516.089, E 263329.223
Slo= local coordinates are 2415.19 S 1296.72 E
Pro~ecCion c'~pe, alaska - Zone 4, Spheroid: Clarke - 1866
Re£erence North is True North
UNOCAL
:RANITE POINT Platform,GP55
~ranx:e Poin: Field,Cook Inlet, Alaska
PROPOSAL LISTING Page 1
Your ref: GP55 Version S2
Las: revised : 12-JLLn-97
Measured I:clin. Az~mu=h True Vert R E C T A N G U L A R
Dept~ =agrees Degrees Depth C 0 0 R D I N A T E S
Dogleg vert
Deg/100ft Sect
0.00 0.00 8.00 0.00 0.00 N 0.00 E 0.00
350.00 0.00 8.00 350.00 0.00 N 0.00 E 0.00
450.0D 1.00 8.00 449.99 0.86 N 0.12 E 1.00
550.0~ 2.00 8,00 549.96 3.46 N 0.49 E 1.00
750.00 2.00 8.00 749.84 10.37 N I.%6 E 0.00
0.00
0.00 Begin D'nl Nudge
-0.78
-3.13 End Angle Build
-9.39
750.15 2.00 8.00 750.00 10.37 N 1.%6 E 1.00
800.00 l. S0 8.00 799.81 11.88 N 1.67 E 1.00
900.00 0.S0 8.00 899.80 13.61 N 1.91 E 1.00
950.00 0.00 0.00 949.80 13.82 N 1.94 E 1.00
950.20 0.00 340.00 950.00 13.82 N 1.94 E 0.00
-9.39 Begin Angle Drop
-12.32
-12.52
-12.52 End D'nl Nudge
1000.00 0.00 340.00 999.80 13.82 N 1.94 E 0.00
1100.00 0.00 340.00 1099.80 13.82 N 1.94 E 0.00
1200.00 0.00 340.00 1199.80 13.82 N 1.94 E 0.00
1300.00 0.00 340.00 1299.80 13.82 N 1.94 E 0.00
1400.00 0.00 340.00 1399.80 13.82 N 1.94 E 0.00
-12.52 13 3/8' Casing PC
-12.52
-12.52
-i2.52
-12.52
1500.00 O.00 340.00 1499.80 13.82 N 1.94 Z 0.00 -12.52
1600.00 0.00 340.00 1599.80 13.82 N 1.94 E 0.00 -12.52
1700.00 ~.00 340.00 1699.80 13.82 N 1.94 E 0.00 -12.52
1800.00 0.00 340.00 1799.80 13.82 N 1.94 E 0.00 -12.52
1900.00 0.O0 340.00 1899.80 13.82 N 1.94 E 0.00 -12.52 KOP
2000.00 2.50 340.00 1999.77 15.87 N 1.20 E 2.50 -13.79
2100.00 %.93 330.15 2099.55 21.65 N 1.69 W 2.50 -16.93
2102.99 5.00 330.00 2102.53 21.87 N 1.82 W 2.50 -17.05
2200.00 3.81 301.95 2199.26 27.2% N 6.67 W 2.50 -18.75
2300.00 4.00 26%.70 2299.04 28.68 N 12.96 W 2.50 -16.39
2400.00 5.48 239.77 2398.71 25.95 N 20.56 W 2.50 -9.86
2500.00 7.51 226.77 2498.07 lg. O7 N 29.45 W 2.50 0.84
2600.00 9.77 219.50 2596.93 8.05 N 39.61 W 2.50 15.67
2700.00 11.12 214.98 2695.11 7.10 S 51.02 W 2.50 34.61
2800.00 1%.52 211.92 2792.41 26.34 S 63.67 W 2.50 57.64
2900.0~ 15.94 209.72 2888.66 49.64 S 77.52 W 2.50 34.69
3000.00 19.39 208.05 2983.67 76.95 $ 92.55 W 2.50 115.72
3100.00 21.85 206.75 3077.26 108.22 $ 108.74 W 2.50 L50.67
3200.00 2A.31 205.70 3169.24 143.39 S 126.05 W 2.50 189.48
3300.00 26.79 204.84 3259.46 182.40 S 144.44 W 2.50 232.07
3400.00 29.26 204.11 3347.73 225.16 S 163.89 W 2.50 278.36
3500.00 31.74 203.48 3433.88 271.60 S 184.36 W 2.50 328.26
3600.00 34.22 202.94 3517.76 321.64 S 205.80 W 2.50 381.68
3700.00 ~6.71 202.46 3599.20 375.17 S 228.18 W 2.50 438.51
3800.00 39.20 202.03 3678.04 432.09 S 251.45 W 2.50 498.65
3900.00 41.68 201.65 3754.14 492.29 S 275.58 W 2.50 ~61.98
4000.00 44.17 201.30 3827.36 555.67 S 300.51 W 2.50 ~28.39
4100.00 %6.66 200.98 3897.55 622.09 S 326.19 W 2.50 ~97.74
4200.0: 49.15 200.69 3964.58 691.44 S 352.58 W 2.50 769.90
4300.00 ~1.64 200.42 4028.32 763.58 S 379.63 W 2.50 ~44.74
4400.01 ~4.14 200.17 4088.65 838.37 $ 407.29 W 2.50 ~22.11
4470.00 ~5.88 200.00 4128.79 892.23 S 426.98 W 2.50 ~77.69 EOC
4500.¢: !5.88 200.00 4145.62 915.57 S 435.47 W 0.00 i~01.76 9 5/8" Casing P:
5000.0~ ~S.88 200.00 4426.08 1304.54 S 577.05 W 0.00 1402.88
5500.0~ ~5.88 200.00 4706.55 1693.50 8 718.62 W 0.00 1804.00
All dana is in fee: unless otherwise snared.
Coordinates from slo: #4-1 and ~,~ from RrB (Rig: #156) (115.00 F: above mean sea level).
Bo:rom hole distance is 12655.06 on azimu:h 214.22 degrees from wellhead.
Total Dogleg for well~a:h is 108.79 degrees.
Vertical sec:ion zs from wellhead on azimuth 214.29 degrees.
Calculation uses :he minimum curvature me:hod.
Presented by Baker Hughes INTEQ
GRANITE POL~T Platform, GP55
Granite Point Field, Cook Inlet, Alaska
PROPOSAL LISTING 9age 2
Your re~ : GP55 Version #2
Last revised : 12-Jun-97
Measured In:lin. Az=a=h True Vet= R E C T A N G U L A R Dogleg Vert
Depth Degrees Degrees Depth C 0 0 R D I N A T E S 2eg/100ft Sect
6000.00 ]5.88 200.00 4987.01 2082.47 S 860.19 W 0.00 2205.11
6100.00 55.88 200.00 5043.10 2160.27 S 888.51 W 0.00 2285.34 Begin Tu=n to Target
6200.00 55.79 201.20 5099.26 2237.72 S 917.62 W 1.00 2365.72
6300.00 55.71 202.41 5155.55 2314.46 S 948.32 W 1.00 2446.A2
6400.00 55.64 203.62 5211.94 2390.47 S 980.61 W 1.00 2527.41
6500.00 55.59 204.83 5268.41 2%65.72 S 1014.47 W 1.00 2608.66
6600.00 55.54 206.04 5324.96 2540.21 S 1049.89 W 1.00 2690.15
6700.00 ]5.51 207.25 5381.57 2613.89 S 1086.85 W 1.00 2771.85
6800.00 ~5.49 208.46 5438.21 2686.75 S 1125.36 W 1.00 2853.75
6900.00 ~5.48 209.68 5494.87 2758.76 S 1165.40 W 1.00 2935.80
7000.00 55.49 210.89 5551.53 2829.91 S 1206.95 W 1.00 3017.99
7100.00 55.50 212.10 5608.18 2900.18 S 1250.01 W 1.00 3100.30
7200.00 55.53 213.32 566%.80 2969.53 S 1294.55 w 1.00 3182.70
7300.00 55.57 214.53 5721.37 3037.96 S 1340.57 w 1.00 3265.15
7400.00 55.62 215.74 5777.87 3105.43 S 1388.05 W 1.00 33%7.65
7500.00 ]5.69 216.~5 5834.29 ~171.93 S 1436.98 W 1.00 ~430.16
7600.00 55.76 218.16 5890.61 ~237.44 S 1487.34 W 1.00 ~512.66
7700.00 ~5.8~ 219.36 5946.81 3301.94 S 1539.12 W 1.00 3595.12
7735.63 55.88 219.79 5966.80 3324.68 S 1557.91 W 1.00 ~624.&9
8000.00 55.88 219.79 6115.08 ~492.86 S 1697.98 W 0.00 3842.36
8500.00 55.88 219.79 6395.51 ~810.95 S 1962.89 W 0.00 4254.41
9000.00 55.88 219.79 6675.94 4129.04 S 2227.80 W 0.00 4666.47
9500.00 55.88 219.79 6956.37 4447.13 S 2492.71 W 0.00 5078.52
10000.00 55.88 219.79 7236.80 4765.22 S 2757.62 W 0.00 5490.57
10500.00 55.88 219.79 7517.23 5083.31 S 3022.53 W 0.00 5902.62
11000.00 55.88 219.79 7797.66 5401.40 S ~287.44 W 0.00 6314.68
11500.00 ~5.88 219.79 8078.09 5719.49 S 3552.35 W 0.00 6726,73
12000.00 55.88 219.79 8358.53 6037.58 S ~817.25 W 0.00 7138.78
12500.00 ~5.88 219.79 8638.96 6355.67 S 4082.16 W 0.00 7550.84
13000.00 55.88 219.79 8919.39 6673.77 S 4347.07 W 0.00 7962.89
13500.00 5~.88 219.79 9199.82 6991.86 S 4611.98 W 0.00 8374.94
14000.00 55.88 219.?~ 9480.25 7309.95 S 4876.89 W 0.00 8787.00
14500.00 55.88 219.7] 9760.68 7628.04 S 5141.80 W 0.00 9199.05
15000.00 5~.88 219.79 10041.11 7946.13 S 5406.71 W 0.00 9611.10
15131.74 55.88 219.79 10115.00 ~029.94 S ~476.51 W 0.00 9719.67 GP55 C5 Rvsd 11-Ju~-97
15200.00 60.51 218.39 10150.96 8074.96 S 5513.06 W 7.00 9777.47
15300.00 67.32 216.55 10194.91 9146.23 S 5567.63 W 7.00 9867.09
15400.00 74.1& 214.89 10227.90 ~222.83 S 5622.68 W 7.00 9961.39
15477.22 79.41 213.68 10245.56 9284.92 S 5665.00 W 7.00 10036.53 Final EOC
15500.00 7~.41 213.68 10249.75 8303.56 S 5677.42 W 0.00 10058.93
16000.00 79.41 213.63 10341.61 ~712.55 S 5949.97 W 0.00 10550.39
16500.00 79.41 213.68 10433.47 3121.55 S 6222.53 W 0.00 11041.85
17000.00 i].%1 213.68 10525.33 9530.54 S 6495.08 W 0.00 11533.31
17500.00 ?~.41 213.68 10617.19 ~939.53 S 6767.64 W 0.00 12024.77
18000.00 ?9.41 213.68 10709.05 1:348.53 S 7040.19 W 0.00 12516.23
18141.23 79.41 213.63 10735.00 1:464.05 S 7117.18 W 0.00 12655.05 GP55 TD Rvsd 11-Jun-97
Ail data is in feet unless otherwise stated.
Coordinates from slot #4-1 and ?VD from RKB (Rig: #156) (115.00 F~ above mean sea level).
~ottom hole distance is 12655.06 on azi=~th 214.22 degrees ~rom wellhead.
Total Dogleg for wellpa~h is 108.79 degrees.
Vertical section is from wellhead on azimuth 21~.29 degrees.
Calculation uses the min=~m curvature me=hod.
Presented by Baker Hughes I~EQ
UNOCA~
GRANITE POINT Pi&=~orm,GP55
Grani=e Point Field. C:ok Inle=, Alaska
PROPOSAL LISTING ~&ge 3
Your ref : GP55 Version
Last revised : 12-Jun-97
Co~e~ns in wellpa~h
MD ~ tscgangular Coords. Co~en~
350.00 350.00 0.00 N 0.00 E Beg~.n D'nl L~udge
550.00 549.96 3.46 N 0.49 E End Angle Build
750.16 750.00 10.37 N 1.46 E Beg~n Angle Drop
950.20 950.00 13.82 N 1.94 E End D'nl Nudge
1000.00 999.80 13.82 N 1.94 E 13 3/8' Casing Pt
1900.00 1899.80 13.82 N 1.94 E KOP
4470.00 4128.79 ~92.23 S 426.98 W EOC
4500.00 4145.62 )15.57 S 435.47 W 9 5/8' Casing Pt
6100.00 5043.10 :160.27 S 888.51 W BegLn Turn to Target
7?35.63 5966.80 2324.68 S 1557.91 W End o~ TuL-n
15131.74 10115.00 2029.94 S 5476.51 W GP55 CS Rvs~ 11-Jun-97
.15477.22 10245.56 3284.92 S 5665.00 W Final EOC
18141.23 10735.00 1:464.05 S 7117.18 W GP55 TD Rvsd ll-Ju~-97
Casing ~os:cions in string 'A'
Top MD Top TVD Rectangular Coords. Bot .~D Bot TVD Rectangular Coords. Casing
0.00 0.00 0.00N 0.00E 294.00 294.00 0.00N 0.00E 26~ Conduc=or
0.00 0.00 0.00N 0.00E 1000.00 999.80 13.82N 1.94E 13 3/8· CasLng
0.00 0.00 0.00N 0.00E 4500.00 4145.62 915.575 435.47W 9 5/8" Cas~ug
0.00 0.00 0.00N 0.00E 15131.74 10115.00 8029.945 5476.51W 7' Casing
Targets associaced with =his we11path
mmmmmwmmmmmmmmmmmmmmmmmmmmmmm~mmmmmmm
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
GPS$ C5 Rvsd ll~jun- 257690.000,2536600.000,0.0000 10115.00 8029.945 5476.51W 12-Fe~-97
GP55 TD Rvsd ll~Jun- 256000.000,2534200.000,0.0000 10735.00 10464.055 7117.18W 12-Feb-97
UNOCAL
GRAtJXTE POINT ~latform,GP55
Granite Point F'-eld, Cook I~leto Alaska
Measured In¢lin. Az=muth True Vert R E C T A N G U L A a
Degc~ Degrees Degrees DepC~ C 00 R D I N A T ! S
9ROPOSAuL LISTING Page 1
Your ref : GP55 Version
las= revised : 12-Jun-97
Dogleg Vert
Deg/10:f~ Sect
0.00 0.00 2.00 0.00 2415.19 $ 1296.72 E 0.00 0.00
350.00 0.00 3.00 350.00 2415.19 $ 1296.72 E 0.00 0.00 Begin D*nl Nudge
450.00 1.00 3.00 449.99 2414.33 $ 1296.84 E 1.00 -0.78
550.00 2.00 3.00 549.96 2411.74 S 1297.20 E 1.00 -3.13 Faxd A~gle Build
750.00 2.00 3.00 ?49.84 2404.82 S 1298.17 E 0.00 -9.39
750.16 2.00 3.00 ?S0.00 2404.82 S 1298.17 E 1.00 -9.39 Begin Angle
800.00 1.50 ~.00 799.81 ...2&03.31 S 1298.39 E 1.00 -10.76
900.00 0.50 3.00 899.80 2401.58 S 1298.63 E 1.00 -12.32
950.00 0.00 3.00 949.80 2401.37 S 1298.66 E 1.00 -12.$2
950.20 0.00 340.00 950.00 2401.37 S 1298.66 B 0.00 -12.52 End D'nl Nudge
1000.00 0.00 340.00 999.80 2401.37 S 1298.66 E 0.00 -12.52 13
1100.00 0.00 340.00 1099.80 2401.37 S 1298.66 E 0.00
1200.00 0.00 340.00 1199.80 2401.37 $ 1298.66 E 0.00 -12.52
1300.00 0.00 340.00 1299.80 2401.37 S 1298.66 E 0.00 -12.52
1400.00 0.00 340.00 1399.80 2401.37 S 1298.66 E 0.00 -12.52
1500.00 0.00 340.00 1499.80 2401.37 S 1298.66 E 0.00 -12.$2
1600.00 0.00 340.00 1599.80 2401.37 S 1298.66 E 0.00 -12.52
1700.00 0.00 340.00 1699.80 2401.37 S 1298.66 E 0.00 -12.52
1800.00 0.00 340.00 1799.80 2401.37 S 1298.66 E 0.00 -12.52
1900.00 0.00 340.00 1899.80 2401.37 S 1298.66 E 0.00 -12.52 KOP
2000.00 2.50 340.00 1999.77 2399.32 S 1297.91 E 2.50 -13.79
2100.00 4.93 330.15 2099.55 2393.54 S 1295.03 E 2.50 -16.93
2102.99 5.00 330.00 2102.53 2393.32 S 1294.90 E 2.50 -17.05
2200.00 3.81 301.95 2199.26 238?.95 S 1290.05 E 2.50 -18.75
2300.00 4.00 26%.70 2299.04 2386.51 S 1283.76 g 2.50 -16.39
2400.00 5.%8 239.77 2398.71 2389.2% S 1276.16 E 2.50 -9.86
2500.00 7.51 226.77 2498.07 2396.12 S 1267.27 E 2.50 0.8%
2600.00 9.77 219.50 2596.93 2407.15 S 1257.11 E 2.50 15.67
2700.00 12.12 214.98 2695.11 2422.29 S 1245.69 E 2.50 34.61
2800.00 14.52 211.92 2792.41 2441.53 S 1233.05 E 2.50 S7.64
2900.00 16.94 209.72 2888.66 2464.83 S 1219.20 E 2.50 84.69
3000.00 19.39 208.05 2983.67 2492.14 S 1204.16 B 2.50 115.72
3100.00 21.85 206.75 3077.25 2523.41 S 1187.98 E 2.50 150.67
3200.00 24.31 205.70 3169.24 2558.58 S 1170.67 E 2.50 189.48
3300.00 26.79 204.84 3259.46 2597.59 S 1152.27 E 2.50 232.07
3400.00 29.26 204.11 3347.73 26%0.35 S 1132.82 E 2.50 278.36
3500.00 31.74 203.48 3433.88 2686.80 S 1112.36 R 2.50 328.26
3600.00 34.22 202.94 3517.76 2736.83 S 1090.92 E 2.50 381.68
3700.00 36.71 202.46 3599.20 2790.36 S 1068.54 E 2.50 438.51
3800.00 39.20 202.03 3678.04 2847.28 S 1045.26 E 2.50 498.65
3900.00 41.68 201.65 3754.14 2907.49 S 1021.14 E 2.50 561.98
4000.00 44.17 201.30 3827.36 2970.86 S 996.21 E 2.50 628.39
4100.00 46.66 200.98 3897.55 3037.29 S 970.52 E 2.50 69?.74
4200.00 49.15 200.69 3964.58 3106.63 S 944.13 E 2.50 769.90
4300.00 51.64 20~.42 4028.32 3178.77 S 917.08 E 2.50 844.74
Oil a~, (hs (;~:ms. Comrr~iss~r~
An,sJ'~o~'aSs
%400.00 54.14 200.17 4088.65 3253.56 S 889.43 E 2.50 922.11
4470.00 55.88 200.00 4128.79 3307.42 S 869.74 E 2.50 977.69 EOC
4500.00 55.88 200.00 4145.62 3330.76 S 861.24 E 0.00 1001.76 9 5/8" Casing
5000.00 55.88 200.00 4426.08 3719.73 S 719.67 E 0.00 1402.88
5500.00 55.88 250.00 4706.55 4108.70 S 578.10 E 0.00 1804.00
All data is in feec unless otherwise stated.
Coordinates from ~ Corner of Sec. 13, T10N, R12W SM and TVD from RK3 (Rig= #156) (115.00 Ft above mea~ sea level).
Bottom hole distance is 12655.06 on azimuth 214.22 degrees from wellhead.
Total Dogleg for wellpath is 108.79 degrees.
Vertical section is from wellhead on &zL---a~h 214.29 degrees.
Calculation uses ~he minimum curvature method.
Presented by Baker Hughes i.~T~Q
UNOCAL
~'-AANITE POINT P!a=form, G~55
Gr~ui=e Poin= Field,Cook Inle=, Alaska
PROPOSAL LISTING ~aga 2
Your ref : GP55 Version #2
L&s= revised : 12*Jun-97
Heasured I==lin. Azimu=~ T~'ue Vet= R E C T A N G 7 L A R Dogleg
Depth Degrees Degrees Depth C 00 R D I N A T E S Deg/100f=
6000.00 55.88 200.00 4987.01 4497.67 S 43&.52 E 0.00 2205.11
6100.00 55.88 200.00 5043.10 4575.46 S 408.21 E 0.00 2285.34
6200.00 55.79 201.20 5099.26 4652.91 S 379.10 E 1.00 2365.72
6300.00 55.71 202.41 5155.55 4729.65 S 348.39 E 1.00 2446.42
6400.00 55.64 203.62 5211.94 4805.66 S 316.11 E 1.00 2527.41
Begin Turn to Target
6500.00 55.59 204.83 5268.41 4880.92 S 282.25 E 1.00 2608.66
6600.00 55.54 206.04 5324.96 4955.40 S 246.83 E 1.00 2690.15
6700.00 55.51 207.25 5381.57 5029.08 S 209.86 B 1.00 2771.85
6800.00 55.49 208.46 5438.21 5101.94 S 171.35 E 1.00 2853.75
6900.00 55.48 209.68 5494.87 5173.96 S 131.32 E 1.00 2935.80
7000.00 55.49 210.89 5551.53 5245.11 S 89.77 E 1.00 3017.99
7100.00 55.50 212.10 5608.18 5315.37 S 46.71 E 1.00 3100.30
7200.00 55.53 213.32 5664.80 5384.72 S 2.17 E 1.00 3182.70
7300.00 55.57 214.53 5721.37 5453.15 S 43.85 W 1.00 3265.15
7400.00 55.62 215.74 5777.87 5520.62 S 91.34 W 1.00 3349.65
7500.00 55.69 216.95 5834.29 5587.12 S 140.27 W 1.00 3430.16
7600.00 55.76 218.16 5890.61 5652.63 S 190.63 W 1.00 3512.56
7700.00 55.85 219.36 5946.81 5717.13 S 242.41 W 1.00 3595.12
7735.63 55.88 219.79 5966.80 5739.87 S 261.20 W !.00 3624.49
8000.00 55.88 219.79 6115.08 5908.05 S 401.27 W 0.00 3842.36
End of Tu~-n
8500.00 55.88 219.79 6395.51 6226.14 S 666.17 W 0.00 4254.41
9000.00 55.88 219.79 6675.94 6544.23 S 931.08 W 0.00 4666.47
9500.00 55.88 219.79 6956.37 6862.32 S 1195.99 W 0.00 5078.52
10000.00 55.88 219.79 7236.80 7180.41 S 1460.90 W 0.00 5490.57
10500.00 55.88 219.79 7517.23 7498.51 S 1725.51 W 0.00 5902.62
11000.00 55.88 219.79 7797.66 7816.60 S 1990.72 W 0.00 6314.68
11500.00 55.88 219.79 8078.09 8134.69 S 2255.63 W 0.00 6726.73
12000.00 55.88 219.79 8358.53 8452.78 S 2520.54 W 0.00 7138.78
12500.00 55.88 219.79 8638.96 87?0.87 S 2785.45 W 0.00 7550.84
13000.00 55.88 219.79 8919.39 9088.96 S 3050.36 W 0.00 7962.89
13500.00 55.88 219.79 9199.82 9407.05 S. 3315.27 W 0.00 8374.94
14000.00 55.88 219.79 9480.25 9725.14 S 3580.18 W 0.00 8787.00
14500.00 55.88 219.79 9760.68 10043.23 S 3845.08 W 0.00 9199.05
15000.00 55.88 219.79 10041.11 10361.32 S 4109.99 W 0.00 9611.10
15131.74 55.88 219.79 10115.00 !0445.13 S 4179.79 W 0.00 9719.67
GPS$ C5 Rvsd 11-Jun-97
15200.00 60.51 218.39 10150.96 10490.15 S 4216.34 W 7.00 9777.47
15300.00 67.32 216.55 10194.91 10561.42 S 4270.91 W 7.00 9867.09
15400.00 74.14 214.89 10227.90 10638.03 S 4325.96 W 7.00 9961.39
15477.22 '9.41 213.68 10245.56 10700.12 S 4368.28 W 7.00 10036.53
15500.00 '].41 213.68 10249.75 10718.75 S 4380.70 W 0.00 10058.93
Final
16000.00 7].41 213.68 10341.61 11127.75 S 4653.25 W 0.00 10550.39
16500.00 79.41 213.68 10433.47 11536.74 S 4925.81 W 0.00 11041.85
17000.00 ?~.41 213.68 10525.33 11945.73 S 5198.37 W 0.00 11533.31
17500.00 ?~.41 213.68 10617.19 12354.72 S 5470.92 W 0.00 12024.77
18000.00 -~.41 213.68 10709.05 12763.72 S 5743.48 W 0.00 12516.23
18141.23 79.41 213.68 10735.00 12879.24 S 5820.46 W 0.00 12655.05 GP55 TD Rvsd 11-Jun-97
All da:a is in feet unless otherwise stated.
Coordinanes ~rom NW Corner of Sec. 13, T10N, R12W SM and TVD from RKB (Rig: #15~) (115.00 F: above mean sea level).
Bottom hole dis:ante is 12655.06 on azimuth 214.22 degrees from wellhead.
To=al Dogleg for wellpa~.~ is 108.79 degrees.
Vertical section is ~rom wellhead on azimur, h 214.29 degrees.
Calcula=ion uses the minimum curvature method.
Presented by Baker Hughes ZNTEQ
UNOCA~
GP~%RITE POINT Pla=form,GP55
Point Field,tusk Inlet, Alaska
~ROPOSAL LISTING ~age 3
Your re~ : GP55 Version
Last revised : 12-Ju~-97
C~-~n=s in wellp&=h
MD ,'VD ~s~tangular Coords. C=mmmn=
350.00 350.00 :415.19 S 1296.72 E Begxn D'nl Nudge
550.00 549.96 2411.74 S 1297.20 E E=d Angle Build
750.16 750.00 ~404.82 S 1298.17 E Begin Angle Drop
950.20 950.00 2401.37 S 1298.66 E ~ D'nl Nudge
lO00.00 999.80 2401.37 S 1298.66 E I~ 3/8" Casing Pt
1900.00 1899.80 2&01.37 S 1298.66 E KCP
4470.00 4128.79 3307.42 S 869.74 E ECC
4500.00 4145.62 3330.76 S 861.24 E 9 S/8" Casing Pt
6100.00 5043.10 4575.46 S 408.21 E Begin Turn to Targa=
7735.63 5966.80 5739.87 S 2'61.20 W End of Turn
151~1.74 10115.00 i~445.13 S 4179.79 W GP55 C5 Rvsd 11-Jun-97
15477.22 10245.56 1:700.12 S 4~68.28 W Final EOC
18141.23 10735.00 12879.24 S 5820.46 W G;S5 TD Rvsd 11-Jun-97
Casing pos&=ions in string 'A'
Top MD Top TVD Rectangular Coords. Bo= MD Bo= TVD Rectangular Coords. Casing
0.00 0.00 2417.195 1296.72E 294.00 294.00 2415.195 1296.72E 26" Conduc:or
0.00 0.00 2415.195 1296.72E 1~00.00 999.80 2401.375 1298.66E 13 3/8' Ca&ing
0.00 0.00 2415.195 1296.72E 4500.00 4145.62 3330.765 861.24E 9 5/8" Casing
0.00 0.00 2415.195 1296.72E 15131.74 10115.00 10445.135 4179.79W 7" Casing
Targets associated wi~h this wellpa~h
Target nm Geographic Location T.V.D. Rectangular Coordinates Revised
GP55 C5 Rvsd 11-Ju~- 157690.000,25~6600.000,0.0000 10115.00 10445.135 4179.79W il-Feb-97
GP$5 TD Rvsd 11-Ju~- 256000.000,2534200.000,0.0000 10735.00 12879.245 5820.46W 12-Feb-97
UNOCAL
POINT P1atformoGP55
P~.Ln= Field, Cook Inlet, Alaska
~ROPOSAL LISTING Page 1
Your re~ : GP55 Version
Last revised : 12-Jun-97
Measured Incli= A=imuth T~ae Vert R E C T A N G U L A R Dogleg Vert G R I D C O 0 R D S
Depth Degrees Degrees Depth C 00 R D I N A T E S Deg/100ft Secn Easting NotChing
0.00 0.00 8.00 0.00
350.00 0.00 8.00 350.00
450.00 1.00 8.00 449.99
550.00 2.00 8.00 549.96
750.00 2.00 8.00 749.84
750.16 2.00 8.00 750.00
300.00 1.50 8.00 799.81
900.00 0.50 8.00 899.80
950.00 0.00 0.00 949.80
950.20 0.00 340.00 950.00
I000.00 0.00 340.00 999.80
1100.00 0.00 340.00 1099.80
1200.00 0.00 340.00 1199.80
1300.00 0.00 340.00 1299.80
1400.00 0.00 340.00 1399.80
1500.00 0.00 340.00 1499.80
1600.00 0.00 ]40.00 1599.80
1700.00 0.00 340.00 1699.80
1800.00 0.00 ]40.00 1799.80
1900.00 0.00 340.00 1899.80
0.00N
0.00N
0.86N
3.&6N
10.37N
10.37N
11.88N
13.
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
13.82N
0.00E ~.~0 0.00 263329.22 2544516.09
0.00E ~.~0 0.00 263329.22 2544516.09
0.12E I.:0 -0.78 263329.36 2544616.95
0.49E i.:0 -3.13 263329.78 2544519.53
1.46E 0.00 -9.39 263330.89 2544526.43
1.46E 1.00 -9.39 253330.89 2544526.43
1.67E I.:0 -10.76 263331.13 2544527.93
1.91E 1.~0 -12.32 263331.&1 2544529.66
1.94E 1.00 -12.52 263331.%5 2644529.87
1.94E 0.00 -12.52 263331.%5 2544529.87
1.94E 0.00 -12,52 263331.45 2546529.87
1.94E 0.00 -12.52 263331.46 2544629.87
1.94E 0.00 -12,52 263331.%5 2544629.87
1.94E 0.00 -12,52 263331.%5 2544529.87
1.94E 0.00 -12,52 263331.45 2544529.87
1.94E 0.O0 -12.52 263331.45 2544529.87
1.94E 0,00 -12.52 263331.45 2544529.87
1.94E 0.00 -12,52 263331.45 2544529.87
1.94E 0.00 -12,52 263331.45 254%529.87
1.94E 0.00 -12.52 263331.45 2544529.87
2000.00 2.50 340.00 1999.77
2100,00 4.93 330.15 2099.55
2102.99 5.00 330.00 2102.53
2200.00 3.81 301.95 2199.26
2300.00 4.00 264.70 2299.04
15.87N
21,65N
21,87N
27,24N
28.68N
2400.00 5.48 239.77 2398.71
2500.00 7.51 226.77 2498.07
2600.00 9.77 219.50 2596.93
2700.00 12.12 214.98 2695.11
2800.00 14.52 211.92 2792.41
25.gSN
19.07N
8.05N
7.106
26.34S
2900.00 16.94 209.72 2888.66 49,646
3000.00 19.39 208.05 2983.67 76.956
~100.00 21.85 206.75 3077.26 108.226
3200.00 24.31 206.70 3169.24 143,396
3300.00 26.79 204.84 3259.46 182,406
1.20E 2.50 -13.79 263330.74 2544531.94
1.69W 2.50 -16.93 263327.98 2544537.77
1.82W 2.50 -17.05 263327.85 2S&4537.99
6.67W 2.50 -18.75 263323.12 2544543.46
12.96W 2.50 -16.39 263316.85 2544645.02
20.56W 2.50 -9.86 263309.20 2544542.46
29.45W 2.50 0.84 263300.17 2544535.76
39.61W 2.50 15.67 263289.79 2544624.94
51.02W 2.50 34.61 263278.07 2544510.03
63.67W 2.50 57.64 263265.03 2544491.06
77.52W 2.50 84.69 263260.71 2544468.05
92.55W 2.50 115.72 263235.11 2544441.05
108.74W 2.50 150.67 263218.30 2544410.12
126.05W 2.50 189.48 263200.28 2544375.31
144.44W 2.50 232.07 263181.09 2544336.69
3400.00 29.26 204.11 3347.73 225.166 163.89W 2.50 278.36 263160.77 2544294.33
3500.00 31.74 203.48 3433.88 271.606 184.36W 2.50 328.26 263139.36 2544248.32
3600.00 34.22 202.94 3517.76 321,646 205.80W 2.50 381.68 263116.90 2544198.73
3700.00 36.71 202.46 3599.20 375.176 228.18W 2.50 438.51 263093.43 2544146.68
3800.00 39.20 202.03 3678.04 432,096 251.45W 2.50 498.65 263069.00 2544089.24
]900.00 41.68 201.65 3754.14 492.296 275.58W 2.50 561.98 253043.65 2544029.55
~000.00 44.17 201.30 3827.36 555,676 300.51W 2.50 628.39 263017.44 2543966.70
~100.00 46.66 200.98 3897.55 622.096 326.19W 2.50 697.74 262990.40 2543900.81
4200.00 49.15 200.69 3964.58 691.446 352.58W 2.50 769.90 262962.60 2543832.02
4300.00 51.64 200.42 4028.32 763.586 379.63W 2.50 844.74 262934.08 2543760.45
~400.00 54.14 200.17 4088.65 838.376 407.29W 2.50 922.11 252904.91 2543686.24
4470.00 55.88 200.00 4128.79 892.236 426.98W 2.50 977.69 262884.12 2543632.80
4500.00 55.88 200.00 4145.62 915.576 435.47W 0.00 1001.76 262875.15 2543609.64
~000.00 55.88 200.00 4426.08 1304.546 577.05W 0.~0 1402.88 262725.67 2543223.66
~500.00 55.88 200.00 4706.55 1693.506 718.62W 0.00 1804.00 262576.18 2542837.68
Ail data in feet unless otherwise s:ated. Calcula:Lon uses minimum cu=vature
=:ordinates from slot #4-1 and ~ ~:~ R~ (Rig: a15S) (ilS.00 Z~ Uove =er
Bottom hole dist~ce is 12655.06 on az~uth 21~.22 degrees from wellhead.
V~r~ical sec=ion is ~r=m wellhead on az~u=h 21%,29 degrees.
GrAd is alaska - ~one %.
UNOCAL
GRANI,'E- POINT Pla~ior-m,GP55
Granite PoLn= Field,Cook Inlet, Alaska
Measured rnclin Azimu=h T.--aa Vet= R E C T A N G U L A R
Depth Degrees Degrees -'ep~ C 00 R D I N A T E S
PROPOSAL LISTING Page l
Your ref : GP55 Version #2
Last revised : 12-Ju~o97
Dogleg Vert G R I D C 00 R D S
Deg/'':~C Seco !as=lng Northing
$000.00 55.88 200.00 4987.01 2082.475 860.19W O.:: 2205.11 262426.70 2542451.70
6100.00 55.88 200.00 5043.10 2160.275 888.51W 0.10 2285.34 262396.80 25%2374.50
6200.00 55.79 201.20 5099.26 2237.725 917.62W 1.21 2365.72 262366.11 2542297.67
6300.00 55.71 202.41 5155.55 2314.465 948.32W 1.:~ 24%6.42 262333.85 2542221.57
6400.00 55.64 203.62 5211.94 2390.475 980.61W 1.:~ 2527.41 262300.02 2542146.24
6500.00 55.59 20%.83 5268.41 2465.725 1014.47W 1.:~ 2608.66 262264.63 2542071.69
6600.00 55.54 206.04 5324.96 2540.215 1049.89W 1.:~ 2690.15 26222?.?0 2541997.95
6700.00 55.51 207.25 5381.57 2613.895 1086.85W 1.:~ 2771.85 262189.23 2541925.05
6800.00 55.%9 208.46 5438.21 2686.755 1125.36W I.:0 2853.75 262149.24 2541852.99
6900.00 55.48 209.68 5494.87 2758.765 1165.%0W 1.~0 2935.80 262107.75 2541781.81
7000.00 55.49 210.89 5551.53 2829.915 1206.95W I.:0 3017.99 262064.75 2541711.52
7100.00 55.50 212.10 5608.18 2900.185 1250.01W 1.~0 3100.30 262020.27 2541642.16
7200.00 55.53 213.32 5664.80 2969.535 I294.55W 1.~0 3182.70 261974.32 2541573.73
7300.00 55.57 214.53 5721.37 3037.965 1340.57W 1.:0 3265.15 261926.91 2541506.26
7400.00 55.62 215.74 5777.87 3105.435 1388.05W 1.~ 3347.65 261878.07 2541439.78
7500.00 55.69 216.95 5834.29 3171.935 1436.98W I.:: 3430.16 261827.79 2541374.29
7600.00 55.76 218.16 5890.61 3237.445 1487.34W I.:: 3512.66 261776.10 2541309.82
7700.00 55.85 219.36 5946.81 3301.945 1539.12W I.:: 3595.12 261723.02 2541246.40
7735.63 55.88 219.79 5966.80 3324.685 1557.91W 1.~0 3624.49 261703.76 2541224.05
8000.00 55.88 219.79 6115.08 3492.865 1697.98W 0.=0 3842.36 261560.30 2541058.77
8500.00 55.88 219.79 6395.51 3810.95S 1962.89W 0.:0 4254.41 261288.95 2540746.17
9000.00 55.88 219.~9 6675.94 4129.048 2227.80W 0.:0 4666.47 ~61017.61 2540433.57
9500.00 55.88 219.79 6956.37 4447.135 2692.?1W 0.~0 5078.52 260746.27 2540120.97
10000.00 55.88 219.79 7236.80 4765.225 2757.62W 0.:0 5490.57 260%?4.92 2539808.37
10500.00 55.88 219.79 7517.23 5083.315 3022.53W 0.:0 5902.62 260203.58 2539495.77
11000.00 55.88 219.79 7797.66 5401.%05 3287.44W 0.:0 6314.68 259932.2% 2539183.17
11500.00 55.88 219.79 8078.09 5719.~95 3552.35W 0.~0 6726.73 259660.89 2538870.57
12000.00 55.88 219.79 8358.53 6037.585 3817.25W 0.:0 7138.78 259389.55 2538557.97
12500.00 55.88 219.79 8638.96 6355.675 4082.16W 0.:0 7550.84 259118.21 2538245.37
13000.00 55.88 219.79 8919.39 6673.775 4347.07W 0.:0 7962.89 258846.87 2537932.77
13500.00 55.88 219.79 9199.82 6991.865 4611.98W 0.~ 8374.94 258575.52 2537620.17
I4000.00 55.88 219.79 9480.25 7309.955 4876.89W 0.:~ 8787.00 258304.18 2537307.56
14500.00 55.88 219.79 9760.68 7628.045 5141.80W 0.:D 9199.05 258032.84 2536994.96
15000.00 55.88 219.79 10041.11 7946.135 5406.71W 0.:~ 9611.10 257761.49 2536682.36
15131.74 55.88 219.79 10115.00 8029.945 5476.51W 0.~ 9719.67 257690.00 2536600.00
15200.00 60.51 218.39 10150.96 8074.96S 5513.06W 7.:~ 9777.47 257652.54 2536555.73
15300.00 67.32 216.55 10194.91 8146.235 5567.63W 7.:0 9867.09 257596.53 2536%85.60
15400.00 74.14 214.89 10227.90 8222.~35 5622.68W ?.:~ 9961.39 257539.92 2536410.14
15477.22 79.41 213.68 10245.56 8284.925 5665.00W 7.:0 10036.53 257496.35 2536348.93
15500.00 79.41 213.68 10249.75 8303.56S 5677.42W 0.~0 10058.93 257483.55 2536330.55
16000.00 79.41 213.68 10341.61 8712.555 5949.97W 0.T0 10550.39 257302.71 2535927.22
16500.00 79.41 213.68 10433.47 9121.555 6221.53W 0.:0 11041.85 256921.86 2535523.90
17000.00 79.41 213.68 10525.33 9530.545 6495.08W 0.~0 11533.31 256641.02 2535120.57
17500.00 79.41 213.68 10617.19 9939.535 6767.64W 0.~ 12024.77 256360.17 2534717.25
18000.00 79.41 213.68 10709.05 10348.535 7040.19W 0.~ 12516.23 256079.33 2534313.92
18141.23 79.41 213.68 10735.00 I0464.055 7117.18W 0.~ 12655.05 256000.00 2534200.00
Ail data in feec u~less otherwise sCa=ed. Caloula==on uses minimum curvature method.
Coordinates ~rom slot #4-1 and TVD from £KB (Rig: #1~6) (115.00 F~ above mean sea level).
BoO=om hole distance is 12655.06 on azimuth 21A.22 degrees from wellhead.
Total Dogleg for wellpath is i~8.79 degrees.
vertical section is from wellhead on &~Lmuth 21~.29 degrees.
Gri~ is alaska - Zone 4.
Grid coordinates in FEET and computed usin~ the Clarke - 1866 spheroid
Presented by ~a~er Hughes INTEQ
UNOC~
~RANI~ POINT ~lat~or~
GPSS
SlOC #4-1
Cook: ?nlet, Alaska
3-D .~ I N i MUM DISTANCE CLEARANCE
Baker Hughes ~NT~0
Your re~ : GP55 Vermxon #2
Our re~ : propl0$3
License :
DaCe printed : 27-Jun-~7
DaCe created : 12-Fe~-97
Last revised : 12-juno97
Field is centred on n60 59 36.731,w151 18 33.112
$Ck'ucture is centred on n60 57 52.745,w151 20 20.066
Slot location is n60 57 28.961,w151 19 53.805
Slot Grid coordinates arm N 2544516.089, E 263329.223
Slot local coordinates arm 2415.19 S 1296.72 E
~ro~ection type= alaska - Zone 4, Sphero=d: Clarke - 1866
Reference North is True Norr_h
Report is limited =o clearances less =has 500 fee~
Ob~ec~ weilpar.~
PMSS ¢11236 - 14086'~,,GpSAS~l.G~JkNITE POINT
PMSS <1130 - 11944'),,GP54,G~kNITE POINT
HSS ¢8630o11376'),,33-23,GRANIT~ POINT Platter
GNS ¢0-12000'),,32-23,GRANIT~ POINT
~ c8900-11986'),,32-23Rd,G~TE POI~
P~S <11453 - 13821'>,,12-13Rd,G~ POI~
G~ G~o <0-7002'>,,22-13,~TZ ~OI~
PMSS <6738 - 12036~),,22-1~Rd,G~ITE POI~
P~S c11395-13934'),,12-13R~.G~TE POI~
PMSS <9437 - 10270'>,,32-13Rd,~TE POI~
P~ <0-10200'>,,32-13,G~TZ ~0I~
PMSS <8478 - 12563'),,32-13Rd12,G~ITE
P~S (0-12163'>,,GP-50,G~ POI~ Pla=fo~
P~ <0-11560'>,,lI-13Rd,G~ POI~ Pla=~or
GMS <4025-11653'>,,11-13,GRARIT~ POINT Plat~or Il-Aug-95
~ ¢0-10191'm,,31-1ARd#2,GRAR~.-~ POINT Pla=go
GMS/MSS <0-8876'),,31-140G~.NITE POINT Plat~or
GMS <0-11011'),,31-14Rd#1,GR~N~TE POINT Plat~o
GMS ¢0-11473'),,33-14,G~XNi, TE POINT Pla~o~m
GMS ¢9200-11410'm,,33-14Rd,G~TE POINT Pla=~
GMS <0-10560'),,24-1~,G~NI, T~ POINT PlaC~cFm
GMS ¢9700-10640'm,,14-13Rd,G--~ANITE POINT Pla~
,~MS/MSS ¢0-11150-15715'~,,..~-JT i-L,G?~NITE ~0iN
Closest approach wi~h 3-D Minimum Distance mer~od
revised Distance M.D. DivergLng £r~m M.D.
23-Jan-97 2.6 500.0 12820.0
15-Apr-97 2.~ 500.0 5700.0
7-Nov-96 44.5 950.2 6300.0
7-Nov-96 44.5 950.2 6300.0
7-Nov-96 44.5 ~50.2 6300.0
IS-Apr-96 84.8 ~20.0 320.0
7-Nov-96 84.8 320.0 13322.0
7-Nov-9~ 84.8 ]20.0 ~20.0
7-Nov-96 84.8 ~20.0 13322.0
7-NOV-96 84.8 320.0 13322.0
7-NOv-96 85.7 600.1 1600.2
7-NOV-96 85.7 600.1 1600.2
7-NOV-96 85.7 ~00.1 1~00.2
7-NOv-96 85.7 600.1 1600.2
7-NOv-96 44.0 2103.0 2103.0
7-NOV-96 46.6 2233.3 2233.3
46.6 2233.3 2233.3
7-Nov-96 61.1 ~60.0 660.0
7-NOV-96 61.1 {60.0 660.0
7-Nov-96 61.1 ~60.0 660.0
7-NOv-96 57.9 Z60.0 260.0
T-NOV-96 57.~ ~60.0 260.0
7-Nov-96 75.7 560.0 560.0
7-Nov-96 75.7 ~60.0 560.0
7-Nov-96 2!.9 ~0.O ~00.0
- Nov-
-Novo96
7-Nov-96
- Nov-
- Nov-
-Novo96
?-Nov- 96
-Nov-
?-Nov- 96
- Nov-
-Nov-96
PM~S ¢11%$ - ????>,,GPS3,GRANITE :POINT Pl&=~or 2¢-Ju~o97
76.5
61.9
63.0
54.5
79.6
27.5
21.0
6S.8
15.7
67.1
67.1
11.3
1933.3
200.0
775.1
100.0
620.0
950.2
720.0
2103.0
1%00.0
700.0
700.0
160.0
1933.3
4780.0
775.1
(200.0
620.0
4720.0
4560.0
2103.0
2500.0
12%00.0
12~80.0
160.0
UNOCAL
Well: GP 55 Field:
Casing Mud WT
Size (PPG~
13-3/8" 9
9-5/8" 9
7" 78
4-1/2"
Casing Design Summary.
Granite Point Date:
6/25/97 Design by: Y, litchell Damm
M.S.P. Max. Kick Tolerance
(psi) (BBLS~
339 95
986 72
$49 326
NA NA
Casing Bottom Top Length Wt
Size (FEET) (FEE13 (FEET) (LB/FIB
26" 329 47 282
TVD 329 47 282
13-3/8" 1,I00 47 1,053 68
TVD 1,100 47 1,053
9-5/8" 4.500 47 4,453 47
TVD 4,145 47 4,098
7" 6,000 47 5,953 29
TVD 4.987 47 4,940
7" 15.130 6,000 9,130 29
TVD 10.115 4,987 5,128
5" 18.141 14,800 3,341 15
TVD 10,735 c),921 814
Grade Thread
Connection
K-55 Buttress
L-80 Butlxess
?- 110 TKC-Buttress
L-80 TKC-Butlxess
L-80 SC: TKC-Buttress
Casing Weight Tension Minimum *Collapse *Collapse Collapse **Burst
Size WI# BF Top of Strength TDF Pressure #1 Pressure #2 Resist. CDF #l CDF 02 Pressure
Section Tension ~ Bottom ~ Bottom Tesnsion
(LBS~ (LBS~ 11,000/LBS) (psi) (psi) (psi) (psi)
13-3/8" 71,604 71,604 1,069 14.9 315 NA 1,950 6.2 NA 2,073
·
9-5/8" 209,291 209,291 1,086 5.2 1,185 NA 4,760 4.0 NA 2,023
7" P-110 438,770 438,770 797 i.8 2.893 .:.928 8,530 2.9 2.2 2,147
7" L-80 264.770 264,770 587 2.2 2,893 9.928 7,030 2.4 1.8 2,147
4- I/2" 50.115 50,115 289 5.8 NA NA NA NA NA NA
* Collapse pressures are calculated using two methods (checks).
1) Difference between two cement slumes (i.e. AVG #fa 15.8 PPG (tail'} & 14.2 PPG (lead) = 15 PPG.
Subtract a mud of 9.5 PPG = 5.5 PPG = .286 psi/FT gradient X TVD of the casing stung.)
2) Difference between Mud Weight on the outside and gas lift gas (0.0 psi/FT) on the inside.
(i.e. Multiply (.052 X MW - 0.0 psi~FD X the TVD of the Top of Cement.
** Burst pressure is calculated. (BHP ~ the depth of the next casing X TVD next casing) X (0.5 = half of weilbore evacuated).
Minimum
Yield
Strength
(psi)
3,450
6,870
9,520
8,160
NA
BI
Kick Tol GP55.xia s. 25.;97
Maximum Surface Pressure Calculations
Well: GP 55
Casing Size: 13-3/8"
Depth Interval: 0'-4,500'
Hole Size: 12.25
General Information:
Anticipated Mud Weight (MW): 9.0 PPG
Shoe Depth (D~h~: 1100 MD
Estimated Fracture Gradient (at the Shoe ~:
Total Depth (Dm): 4500 MD
Bottom Hole Pressure Gradient (BHPG ~:
Gas Gradient (GG); (assumes worse case ~:
Maximum Gas Column Height in wellt:ore when top of gas is at the shoe (Ht):
0.468 vsi/FT
1100 TVD
0.85 psi/FT
4145 TVD
0.45 psi/FT
0.10 psi/FT
!,125 Feet
(@ anticipated Mud Weight)
Maximum Surface Pressure Calculations:
The welibore volume is determined using the height of gas column in welibore when toy of gas bubble is at the shoe-
during a gas kick situation. A percent~e of the gas column height (Ht), found in the Maximum Kick Tolerance Calculations, is used.
Maximum Surface Pressure = Maximum Bottom Hole Pressure - Hydrostatic Pressure ~Gas Volume *Mud Volume~
MSP = P,~.m- GG*Ht - .052*MW*(Dm-Ht)
MSP = 339 psi
Hydrostatic Pressure at the Shoe Calculations:
The greatest hydrostatic pressure at the shoe (Pshoe) is when the gas bubble reaches the shoe. Assuming a constant
bottom hole pressure is applied while c:rculating out the gas kick. A conservative esnmate would be the maximum
surface pressure plus the hydrostatic pressure at the Shoe Depth (Dshoe).
P~ho~ = MSP + .052*MW*Dsho,
Pshoe= 854 psi FP,hoe= 935 psi
The pressure at the shoe (Pshoe) is less than the fracture pressure at the same shoe.
Therefore the shoe integrity is sufficient to adequately handle a gas kick.
Pressure Differential Across the Shoe:
Pressure differential across the casing shoe = Pshoe - Maximum pore pressure at shoe
DPshoe = Pshoe - Pmax (~ shoe = Pshoe - BHPG * Dsh~
DP shoe = 359 psi
The DPshoe is less that the internal vieici of the casing.
Kick Tol GP55.xls 13-38" MSP 6/25/97
Maximum Kick To 'c,-ance Calculations ~
Well: GP 55 Casing Shoe: 13-3/8"
General Information Variables
1 13-3/8" Casing Shoe ~from RT)+B6 1.100 Feet iTVD) D~,o~
2 Fracture pressure Gradient 0.85 psi/FT FPG
3 Fracture pressure at the 26" Shoe 935 psi FP-~o~
4 Proposed TD of the 9-5/8" Casing Shoe ~ TVD~ 4.145 Feet I TVD) Dm
5 Pore pressure gradient 0.450 psbFT PpG
6 Maximum anticipated pore pressure Id TI3 1.865 psi
7 Mud Weight See table PPG
8 Gas Gradient 0.10 psisFT GG
9 Average open hole size 12.25 Inches ODo,
10 Drillpipe OD 5.00 i Inches ODDP
11 Capacity of open hole by drillpipe 0.1214 BBLFT CAP
12 Height of gas column in wellbore when top of gas is at the shoe HT Feet ~ I'VD) Ht
Assumptions tbr Granite Point Field:
Fracture Pressure Gradient = .9 PSI/FT.
All calculations assume that water based mud is used and does not take into account gas solubilitx' in oil based mud.
Gas bubble height in weilbore (Ht) calculation with gas bubble top at 13-3/8" shoe.
FPshoe ~- Pgas bubble + Pmud = Pmax~ TI)
FP~ho~ + GG*Ht + .052*MW*(Dm-D,h~Ht) =
Gas Volume (GV) calculation at 13-3/8" shoe.
GV = CAP*Ht
Kick Tolerance calculation: Gas volume in weilbore at TD.
P I V 1 = P2V2. Assume constant temperature.
Kick Tolerance * P~.=(_~ ~'D = GV * FP
Mud Weight Gas Bubble Height Gas Volume(~.Shoe Kick Tolerance
(PPG} (Feet} (BBLS} (BBLS}
8.4 1,187 144 72
8.6 1,243 151 76
8.8 1,295 157 79
9.0 1,345 163 82
9.2 1,391 169 85
9.4 1,436 174 87
9.6 1,477 179 90
9.8 1,517 184 92
10.0 1,555 189 95
10.2 1,591 193 97
10.4 1,625 197 99
10.6 1,658 201 101
10.8 1,689 205 103
11.0 1,719 209 105
Kick Tol GP55.xls 6~25/97
Maximum Surface Pressure Calculations
Well: GP 55
Casing Size: 9-5/8"
Depth Interval: 0'-15,130'
Hole Size: 8.50
General Information:
Anticipated Mud Weight (MW): 9.0 PPG
Shoe Depth (D~,: 4500 MD
Estimated Fracture Gradient (at the Shoe):
Total Depth (Dm): 15,130 MD
Bottom Hole Pressure Gradient (BHPG):
Gas Gradient I'GG); (assumes worse case):
Maximum Gas Column Height in wellbore when top of gas is at the shoe I Htr:
0.468 psi/FT
4145 TVD
0.85 psiiFT
10115 TVD
0.50 psi/FT
0.10 psiiFT
1.800 Feet
anticipated Mud Weight)
Maximum Surface Pressure Calculations:
The welibore votume is determined using the height of gas coiumn in weitbore when top of gas bubble is at the shoe--
dunng a gas kick situation. A percentage of the gas column height (Ht), found in the Maximum Kick Tolerance Calculauons, is used.
Maximum Surface Pressure = Maximum Bottom Hole Pressure - Hydrostatic Pressure (Gas Volume +Mud Volume)
MSP = P~.~,~rD. GG*Ht - .052*MW*(Dm-Ht)
MSP = 986 psi
Hydrostatic Pressure at the Shoe Calculations:
The greatest hydrostatic pressure at the shoe (Pshoe) is when the gas bubble reaches the shoe. Assuming a constant
bottom hole pressure is applied while circulating out the gas kick. A conservative estimate would be the maximum
surface pressure plus the hydrostatic pressure at the Shoe Depth (Dshoe).
P~ = MSP + 052*MW*D~h~
Pshoe= 2.926 psi FP,aoe= 3,523 psi
The pressure at the shoe (Pshoe~ is less than the fracture pressure at the same shoe.
Therefore the shoe integrity is sufficient to adequately handle a gas kick.
Pressure Differential Across the Shoe:
Pressure differential across the casing shoe = Pshoe - Maximum pore pressure at shoe
DPshoe = Pshoe - Pmax ~ shoe = Pshoe - BHPG * D~ho~
DPshoe= 853 psi
The DPshoe ~s less that the internal yield of the casing.
Kick Tol GP55.xls 9-58" MSP 6 25/97
Maximum Kick To~e, ance Calculations
Well: GP 55 Casing Shoe: 9-5/8"
General Information Variables
1 '9-5/8" Casing Shoe I from RT) 4,145 Feet {TVD) D,ho~
2 Fracture pressure Gradient 0.85 psi/FT FPG
3 Fracture pressure at the 9-5/8" Shoe 3,523 psi FP~h~,
4 Proposed TD of the 7" Casing Shoe ITVD} 10,115 Feet (TVD~ Dm
5 Pore pressure gradient 0.50 psi~FT PpG
6 Maxunum anticipated pore pressure (~ TD 5,058 psi Pma~i, TD
7 Mud Weight See table PPG MW
8 Gas Gradient 0.10 psi~FT GG
9 Avenge open hole size 8.50 I Inches ODo.
I0 Drillpipe OD 5.00 Inches ODm,
11 Capacity of open hole by drillpipe 0.0459 BBL/FT CAP
12 Height of gas column in wellbore when top of gas is at the shoe HT Feet (TVD~ Ht
Assumptions for Granite Point Field:
Fracture Pressure Gradient = .9 PSI/FT: and Maximum Pore Pressure Gradient = .52 PSI/FT. (GP 13-13; 1967)
All calculations assume that water based mud is used and does not take into account gas solubility, in oil based mud.
Gas bubble height in weilbore (Ht) calculation with gas bubble top at 9-5/8" shoe.
FPshoe + Pgas bubble + Proud = Pmax~ TD
FP~ho~ + GG*Ht + .052*MW*(Dm-D~ho~-Ht) = P~,=t,m
Gas Volume (GV) calculation at 9-5/8" shoe.
GV = CAP*Hr
Kick Tolerance calculation: Gas volume in wellbore at TD.
P 1V 1 = P2V2. Assume constant temperature.
Kick Tolerance * P~,~, ~-r~ = GV * FP
Mud Weight Gas Bubble Height Gas Volume (~ Shoe Kick Tolerance
(PPG} (Feet} (BBLS} (BBLS}
8.4 3,187 146 102
8.6 3,271 150 105
8.8 3,349 154 107
9.0 3,423 157 109
9.2 3,493 160 112
9.4 3,559 163 114
9.6 3,622 166 116
9.8 3,682 169 118
10.0 3,738 172 119
10.2 3,792 174 121
10.4 3.844 176 123
10.6 3,893 179 124
10.8 3,940 181 126
11.0 3,984 183 127
Kick Tol GP55.xls 6/25/97
Maximum Surface Pressure Calculations
Well: GP 55
Casing Size: 7"
Depth Interval: 0'-18.141'
Hole Size: 6.00
General Information:
Anticipated Mud Weight (MW): 7.8 PPG
Shoe Depth (D,~o,~: 15,130 MD
Estimated Fracture Gradient (at the Shoe I:
Total Depth (Dm): 18.141 MD
Bottom Hole Pressure Gradient (BHPG'~:
Gas Gradient (GG); (assumes worse case}:
Maximum Gas Column Height in weltbore when top of gas is at the shoe (Hr):
0.406 psi/FT
10115 TVD
0.85 psi/FT
10735 TVD
0.20 psi/FT
0.10 psi/FT
l 0,000 Feet
(~: anticipated Mud Weight)
Maximum Surface Pressure Calculations:
The wellbore volume is determined using the height of gas column in wellbore when top of gas bubble is at the shoe--
during a gas kick situation. A percentage of the gas column height (Htr, found in the Maximum Kick Tolerance Calculations, is used.
Maximum Surface Pressure = Maximum Bottom Hole Pressure - Hydrostatic Pressure (Gas Volume *Mud Volumel
MSP = P,,~,~m- GG*Ht - .052*MW*(Dm-Ht)
MSP = 849 psi
Hydrostatic Pressure at the Shoe Calculations:
The greatest hydrostatic pressure at the shoe (Pshoe) is when the gas bubble reaches the shoe. Assuming a constant
bottom hole pressure is applied while circulating out the gas kick. A conservative estimate would be the maximum
surface pressure plus the hydrostatic pressure at the Shoe Depth (Dshoe).
P,ho~ = MSP + .052*MW*D,~o,
Pshoe= 4,952 psi FP,hoe= 8598 psi
The pressure at the shoe {Pshoe} is less than the fracture pressure at the same shoe.
Therefore the shoe integrity is sufficient to adequately handle a gas kick.
Pressure Differential Across the Shoe:
PresSure differential across the casing shoe = Pshoe - Maximum pore pressure at shoe
DPshoe = Pshoe - Pmax ~ shoe = Pshoe - BHPG * D~
DP shoe= 2,929 psi
The DPshoe is less that the internal yield of the casing.
Kick Tol GP55.xls 7" MSP 6/25/97
Maximum Kick Toi~cance Calculations
Well: GP 55 Casing Shoe: 7"
General Information Variables
1 17" Casing Shoe (from RT) 10.115 Feet ('I'X,T)3
2 I Fracmre pressure Gradient 0.85 psi/FT FPG
3 Fracture pressure at the 7" Shoe 8,598 ipsi
4 Proposed TD of the 5" Casing Shoe i'-I-VD3 10.735 Feet I T~.T))
5 Pore pressure ~adient 0.20 psi/FT PpG
6 Maximum anticipated pore pressure Id'. TD 2,147 psi Pr~.~_~rD
7 Mud Weight See table PPG
8 Gas Gradient 0.10 psi/FT GG
9 Average open hole size 6.00 Inches ODo,
10 Drillpipe OD 3.50 Inches ODDP
I 1 Capacity of open hole by drillpipe 0.0231 BBL/FT C.-LP
12 Height of gas column in welibore when top of gas is at the shoe HT Feet (TVD) Ht
i
Assumptions for Granite Point Field:
Fracture Pressure Gradient = .9 PSI/FT: and Maximum Pore Pressure Gradient = .52 PSI/FT. (GP 13-13; 1967~
Ali calculations assume that water based mud is used and does not take into account gas solubility in oil based mud.
Gas bubble height in weilbore (Ht) calculation with gas bubble top at 7" shoe.
FPshoe ? Pgas bubble ~- Proud = Pmax@, TD
FPsho~ ~- GG*Ht + .052*MW*(D~-r~-Dsho~-Ht) = P~,,~_~x~
Gas Volume (GV) calculation at 7" shoe.
GV = CAP*Ht
Kick Tolerance calculation: Gas volume in wellbore at TD.
PI VI = P2V2. Assume constant temperature.
Kick Tolerance * Pm~, TD = GV * FP
Mud Weight Gas Bubble Height Gas Volume/~ Shoe Kick Tolerance
(PPG} (Feet) (BBLS} (BBLS)
7.6 22.682 523 2,095
7.8 21,931 506 2,025
8.0 21,230 490 1,960
8.2 20,573 474 1,900
8.4 19,957 460 1,843
8.6 19,378 447 1,789
8.8 18,832 434 1,739
9.0 18,318 422 1,691
9.2 17,831 411 1,647
9.4 17.371 401 1,604
9.6 16,935 390 1,564
9.8 16,520 381 1,526
10.0 16,127 372 1,489
10.2 15,752 363 1,455
10.4 15,395 355 1,422
10.6 15,054 347 1,390
10.8 14,729 340 1,360
11.0 14.418 332 1,331
Kick Tol GP55.xls 6/'25/97
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Mitch Damm Date: 6/14/97 Revision ~2 UH0CAL ,~
Estimate for Grass Roots Oil Well.
No. Preliminary Procedure Time CUM CUM Depth Depth Estimated
Estimate Time Time I n Out Date
(Hours) (Hours) (Days) (Feet) (Feet)
Move and prep rig. I
Change out liners
Skid ri~ over slot 4-4.
Cut open conductor and weld squinch ioint to producition deck.
Cuttings line rerouting. Extra time required due to piping configuration.
Clean mrs.
Install Riser and Bell Nippte. 15-Jul-9
Total Rie Mobilization. -;2.0 42 1.8 t 294 16-Jul-9
42 I. 8I! 294 16-Jul-9
17-1/2" Hole Section 42 1.8 294 16-Jul-9
I 'PU 5" driilmpe, drill collars, and HWDP !4.0 56 2.3 294 17-Jul-9
2 MU BHA,r-I 3.0 59 2.5 294 17-Jul-9
3 RIH. Circulate well clean. 2.0 61 2.5 294 17-Jul-9
4 RU scientific. Gyro Conductor. 4.0 65 2.7 294 17-Jul-9
5 Rotary drill from 294' to 1,100' taking single shot surveys, l 5.0 80 3.3 294 1,200 18-Jul-9
6 Cire and condition hole. 1.0 81 3.4 1,200 18-Jul-9
7 POOH w~th BHA #1. 1.5 83 3.4 1,200 18-Jul-~
8 LD BHA. 2.0 85 3.5 1,200 18-Jul-C~
9 RU CaslngCrew 2.0 87 3.6 1,200 18-Jul-C~
10 RIH with 13-3/8" Casing to 1,100'. 5.0 92 3.8 1,200 18-Jul-C~
11 PU wellhead and land wellhead. ~.0 93 3.9 1,200 18-Jul-r
12 RU to l~umr~ cement 2.0 95 3.9 1,200 18-Jul4
13 Pump cement job taking returns to surface. :.0 99 4. I 1,200 19-Jul4
14 Release anti LD running tools. RD cementing Eq. 2.0 101 4.2 ! 1.200 19-Jul4
15 LD riser. Cut off squinch joint. 3.0 104 4.3 1,200 19-Jul4
16 NU XO srmol, riser and 13-5/8" BOPE. I0.0 114 4.7 1,200 19-Jul-!
17 Test BOPE. .:.0 118 4.9 i,200 19'Jul-!
118 4.9 1,200 19-Jul-!
12-1/4" Hole Section 118 4.9 1,200 19-Jul-!
18 MU BHA ~2. (MWD and Motor) -'.0 122 5.1 1,200 20-Jul-!
19 RiH with BHA. 2.0 124 5.1 1,200 20-Jul-!
20 Drill cement. Test casing. ~.5 125 5.2 1,200 20-Jul-!
21 Drill out of shoe and perform leak-off test. 2.5 128 5.3 1,200 20-Jul-!
22 Drill 12-1'4" hole f/1.100' to 5,000'. $0.0 208 8.6 1,I 00 5,000 23-Jul-'
23 CBU anti condition hole 2.0 210 8.7 5,000 23-Jul-'
24 POOH w~th BHA. 3.0 213 8.9 5.000 23-Jul-'
25 LD BHA. 2.0 215 8.9 [ 5,000 23-Jul-
26 Change .m.~e rams and test BOPE. 2.0 217 9.0I 5.000 . .24-Jui-
27 RU casin~ crew ~.5 218 9.1 5,000 24-Jul-
28 RIH with 9-5/8" casing. '.0.0 228 9.5 5.000 24-Jui-
29 Land hand, er and circulate [.0 229 9.5 5,000 24-Jul-
30 Pump Cement Job 5.0 234 9.8 5.000 24-Jul-
31 , Release running tool. RIH with wash tool. 2.5 237 9.9
5
24-Jul-
32 RIH with CSG hanger packoff. , 5.0 242 I0.1 5.00..0... 25-Jul-
GP55 AFE est 2.XLS Page 1 cf 6 6/25/97
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Mitch Damm Date: 6/14/97 Revision #2 UNOCAL-~
Estimate for Grass Roots Oil V~'ell.
No. ~Preliminarv Procedure Time i CUM CUM Depth Depth Estimated
i Estimate Time Time In Out I Date
i (Hours) (Hours) (Days) (Feet) (Feet)
I I
33 tRun wear bushing 0.5 242 10.1 5,000 25-Jui-9
I
10.1 5.000 25-Jul-9
8-1/2" Hole Section 242 10.1 5,000 25-Jul-9
34 Clean pits for OBM and mst'er OBM from Beam tanks. 7.0 249 10.4 5,000 25-Jui-9
35 Change Rams. Test BOP's 4.0 253 10.5 5,000 25-Jui-9
36 ,MU BHA #4 4.0 257 10.7 5,000 25-Jul-9
37 RIH with BHA 3.0 260 10.8 5.000 25-Jul-9
38 Drill Cement and pressure test casing 3.0 263 I 1.0 5.000 25-Jul-9
39 Drill out of shoe and perform leak offtest. 2.0 265 l 1.0 5,000 5.010 26-Jul-9
40 Drill 8-1/2" hole. 125.0 390 16.3 5,010 10.010 31-Jul-9
41 CBU. 1.0 391 16.3 10,010 3 l-Jul4
42 POOH with BHA. 6.0 397 16.5 10,010 31-Jul-~
43 BHA handling. 3.0 400 16.7 10,010 31-Jul-~
44 Cut and strip drilling line. 1.0 401 16.7 10,010 3 l-Jul-t.
45 ~Routine Rig Maintenance 1.0 402 16.8 10,010 31-Jul4
46 Test BOPE. 5.0 407 17.0 10,010 31-Jul4
47 RIH with BHA 4.0 411 17.1 10,010 1-Aug-t.
48 Ream to bottom. 2.0 413 17.2 10,010 I-Aug-!
49 Drill 8-1/2" hole 84.8 498 20.7 I0,010 12,300 4-Aug-!
50 POOH 8.0 506 21.1 12,300 5-Aug-!
51 BHA Handling 2.0 508 21.2 12.300 5-Aug-!
52 RIH with BHA 5.0 513 21.4 12.300 5-Aug-!
53 Ream to bottom. 2.0 515 21.5 12.300 5-Aug-!
54 IDriiling 8-1/2" hole. 88.9 604 25.2 12.300 13.900 9-Aug-'
55 POOH 9.0 613 25.5 13.900 9-Aug-'
56 BHA Handling 2.0 615 25.6 13.900 9-Aug-'
57 RIH with BHA 6.0 621 25.9 13.900 9-Aug-
58 Ream to bottom. 3.0 624 26.0 13.900 9-Aug-
59 Drilling 8-1/2" hole. 76.9 701 29.2 13,900 15.130 13-Aug-
60 Circulate bottoms up. 2.0 703 29.3 15,130 13-Aug-
61 POOH I0.0 713 29.7 15,130 13-Aug-
62 Change pipe rams and test. Pull wear bushing 3.0 716 29.8 15,130 13-Aug-
63 :RU casing crew 3.0 719 29.9 15,130 13-Aug-
64 Run 7" casing 24.0 743 30.9 15,130 14-Aug-
65 Land hanger and RU cementing equipment. 2.0 745 31.0 15,130 15-Aug-
66 Pump cement job. 6.0 751 31.3 15.13'~' 15-Aug.
67 Release running tool. RIH with wash tool. 1.0 752 31.3 15,130 15-Aug.
68 RIH with CSG hanger paci~off. 2.0 754 31.4 15.130 15-Aug.
69 Run wear bushing 1.0 755 31.4 15.130 15-Aug.
70 Lay down 5" drillpipe. ?revare for 8.2 PPG OBM. 18.0 773 32.2 15.130 16-Aug.
71 PU 3-1/2" drilpipe 22.0 795 33.1 15,130 17-Aug.
t 33.1 15,130 17-Aug
6" C-5 Lateral 14.0 otai HRS 33.1 15.1~0 17-Aug
Estimated Bit Performance = 160.0 , Total FT! 33.1 15,130 17-Aug
,GP55 AFE est 2.XLS Page 2 of 6 6/25/97
Unocal Alaska Business Unit
Granite Point Platform
Well 055
Prepared bv: Mitch Damm Date: 6/14/97 Revision ~2 UNOCAL~)
Estimate for Grass Roots Oil Well.
No. Preliminary Procedure Time CUM CUM Depth Depth Estimated
Estimate Time Time I n Out Date
(Hours) (Hours) (Days) (Feet) (Feet)
71 MU BI-IA I 3.0 798 33.2 15,130 17-Au?~
72 R.IH with BHA. 6.0 804 33.5 15,130 17-Aug-~
73 Drill cement and pressure test casing. 3.0 807 33.6 15,130 17-Aug-~
74 Drill I0' offormaUon and perform LOT. 2.0 809 33.7 15,130 15,140 17-Aug-!
75 Change overto 8.2 PPG OBM. 4.0 813 33.9 15,140 17-Aug-!
76 Drill 6" hole 14.0 827 34.4 15,140 15,360 18-Aug-!
77 POOH 5.0 832 34.6 15,360 18-Aug-!
78 BHA handling. 2.0 834 34.7 15,360 18-Aug-!
79 RIH with BHA. 6.0 840 35.0 15,360 18-Aug-!
80 Ream to bottom. 1.0 841 35.0 15,360 19-Au?
81 Drill 6" hole 14.0 855 35.6 15,360 15,520 19-Aug-'
82 POOH 5.0 860 35.8 15,520 19-Aug-
83 BHA handling. 2.0 862 35.9 15,520 19-Aug-
84 RIH with BHA. 6.0 868 36.1 15,520 20-Aug-
85 Reamto bottom. 1.0 869 36.2 15,520 20-Aug-
86 Drill 6" hole 14.0 883 36.8 15,520 15,680 20-Aug-
87 POOH 5.0 888 37.0 15,680 20-Aug-
88 BHA handling. 2.0 890 37.1 15,680 21-Aug-
89 RIH with BHA. 6.0 896 37.3 15,680 21-Aug-
90 Ream to bottom. 1.0 897 37.4 15,680 21-Aug-
91 Drill 6" hole 14.0 911 37.9 15,680' 15,840 21-Aug-
92 POOH 5.0 916 38.1 15,840 22-Aug.
93 BHA handling. 2.0 918 38.2 15,840 22-Aug.
94 R_IH with BHA. 6.0 924 38.5 15,840 22-Aug.
95 Ream to bottom. 2.0 926 38.6 15,840 22-Aug.
96 Drill 6" hole 14.0 940 39.1 15,840 16,000 23-Aug
97 POOH 5.0 945 39.4 16,000 23-Aug
98 BHA handling. 2.0 947 39.4 16,000 23-Aug
99 RIH with BHA. 6.0 953 39.7 16,000 23-Aug
100 Ream to bottom. 2.0 955 39.8 16,000 23-Aug
101 Drill 6" hole 14.0 969 40.4 16,000 16,160 24-Aug
102 POOH 5.0 974 40.6 16,160 24-Aug
103 BOP Test 4.0 978 40.7 16,160 24-Aug
104 BHA handling. 2.0 980 40.8 16,160 24-Aug
105 RIH with BHA. 6.0 986 41.1 16,160 25-Aug
106 Ream to bottom. 2.0 988 41.1 16,160 25-Aug
107 IDrill 6" hole 14.0 1002 41.7 16,160 16,320 25-Aug
108 POOH 5.0 1007 41.9 16,320 25-Aug
109 BHA handling. 2.0 1009 42.0 16,320 26-Aug
110 R. IH with BHA. 6.0 1015 42.3 16,320 26-Aug
111 Ream to bottom. 2.0 1017 42.4 16,320 26-Au~
112 Drill 6" hole. 14.0 1031 42.9 16,320 16,480 26-Am.
113 POOH 5.0 1036 43.1 16,480 27-Am.
114 BHA handling. 2.0 1038 43.2 16,480 27-Am
,
GP55 AFE est 2.XLS Page 3 of 6 6/25/97
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Mitch Damm Date: 6/14/97 Revision #2 UNOCAL~
Estimate for Grass Roots Oil XVell.
No. Preliminary Procedure Time CUM CUM Depth Depth Estimated
Estimate Time Time In Out Date
(Hours) (Hours) (Days) (Feet) (Feet)
115 R.IH wr~ BHA. 6.3 1044 43.5 16,480 27-Au~,-9
/
116 Ream to bottom. 3.0 1047 43.6 16,480 27-Aug-9
117 Drill 6" hole. 15.0 1062 44.2 16,480 16,640 28-Aug-9
118 POOH 5.3 1067 44.5 16,640 28-Aug-9
119 BHA handling. 2.0 1069 44.5 16,640 28-Aug-9
120 RIH wTm BHA. 6.3 1075 44.8 16,640 28-Aug-~
121 Ream To bottom. 3.0 1078 44.9 16,640 28-Aug-~
122 Drill 6" hole. 15.0 1093 45.6 16,640 16,800 29-Aug-~
123 POOH 5.3 1099 45.8 16,800 29-Aug-C~
124 BHA handling. 2.0 1101 45.9 16,800 29-Aug-C~
125 RIH wen BHA. 6.3 1107 46.1 16,800 30-Aug-c.
126 Ream to bottom. 3.0 1110 46.2 16,800 30-Aug-~.
127 Drill 6" hole. 15.0 1125 46.9 16,800 16,960 30-Aug-~.
128 POOH 5.3 1130 47.1 16,960 31-Aug-!
129 BHA handling. 2.0 1132 47.2 16,960 3 l-Aug-!
130 RIH w~m BHA. 6.5 !139 47.4 16,960 31-Aug-!
131 Ream to bottom. 3.0 1142 47.6 16,960 3 l-Aug-!
132 Drill 6" hole. 15.0 1157 48.2 16,960 17,120 l-Sep-!
133 POOH 5.5 1162 48.4 17,120 l-Sep-'
134 BHA handling. 2.0 1164 48.5 17,120 I-Sep-'
135 RiH wTm BHA. 6.5 1171 48.8 17,120 I-Sep-'
136 Ream to bottom. 3.0 1174 48.9 17,120 I-Sep-
137 Drill 6" hole. 15.0 1189 49.5 17,120 17,280 2-Sep-
138 BOP te~ 4.0 1193 49.7 17,280 2-Se~-
139 POOH 5.5 1198 49.9 17,280 2-Sep-
140 ,BHA handling. 2.0 1200 50.0 17,280 3-Sep-
141 RIH w~m BHA. 6.5 1207 50.3 17,280 3-Sep-
142 Ream m bottom. 3.0 1210 50.4 17,280 3-Sep-
143 Drill 6" hole. 15.0 1225 51.0 17,280 17,440 4-Sep-
144 POOH 5.5 1230 51.3 17,440 4-Sep-
145 BHA handling. 2.0 1232 51.3 17,440 4-Sep.
146 RIH wire BHA. 6.5 1239 51.6 17,440 4-Sep.
147 Ream to bottom. 3.0 1242 51.7 17,440 4-Sep.
148 Drill 6' hole. 15.0 1257 52.4 17,440 17,600 5-Sep.
149 POOH 5.5 1262 52.6 17,600 5-Sep.
150 BHA ~dling. 2.0 1264 52.7 17,600 5-Sep
151 RIH w~:n BHA. 6.5 1271 52.9 17,600 5-Sep
152 Ream z: bottom. 3.0 1274 53.1 17,600 6-Sep
153 Drill 6" hole. 15.0 1289 53.7 lT600 17,760 6-Sep
154 POOH 5.5 1294 53.9 17,760 6-Sep
155 BHA ~andling. 2.0 1296 54.0 17,760 7-Sep
156 RIH w~:n BHA. 6.5 1303 54.3 17,760 7-Sep
157 Ream t~ i~ottom. 3.0 1306 54.4 17,760 7-Sep
158 Drill 6' hole. 15.0 1321 55.0 17,760 17,920 8-Sep
GP55 AFF_ est 2.XLS Page 4 of 6 6125197
Unocal Alaska Business Unit
Granite Point Platform
Well #55
Prepared by: Mitch Damm Date: 6/14/97 Revision #2 UN0CAL~
Estimate for Grass Roots Oil Well.
No. ~Preliminarv Procedure Time CUM CUM Depth Depth Estimated
i Estimate Time Time In Out Date
i (Hours) (Hours) (Days) (Feet) (Feet)
! I
,
159 POOH 5.5 1326 55.3 17,920 8-Sep4
160 BHA handling. 2.0 1328 55.3 17,920 8-Sep-t/
161 nIH with BHA. 6.5 1335 55.6 17,920 8-Sep-(.
162 Ream to bottom. 3.0 1338 55.7 17,920 8-Sep-!
163 Drill 6" hole. 15.0 1353 56.4 17,920 18,080 9-Sep-!
164 CBU 3.0 1356 56.5 18,080 9-Sep-!
165 POOH with BHA 10.0 1366 56.9 18,080 9-Sep-!
166 LD motor and MWD 4.0 1370 57.1 18.080 10-Sep-!
167 RU SWS WLU for DP conveved logs. 2.0 1372 57.1 18.080 10-Sep-'
168 RIH with lol!ging tools: DIL, FDC, CNL, DT, GR, CCL 8.0 1380 57.5 18.080 10-Sep-'
169 Install side door entry, sub. nIH with wet connect. 8.0 1388 57.8 18,080 10-Sep-'
170 Log C-5 8.0 1396 58.1 18,080 I l-Sep-
171 ND side-door entry, sub. POOH with wiretine 3.0 1399 58.3 18,080 1 !-Sep-
172 POOH with logging tools 9.0 1408 58.6 18,080 11-Sep-
173 RU casing crews for 5" liner 1.5 1409 58.7 18,080 11-Sep-
174 nIH with 5" liner 5.0 1414 58.9 18,080 11-Sep-
175 Continue to nIH with 5" liner on drillpipe 9.0 1423 59.3 18,080 12-Sep-
176 Circulate and condition hole for cement. 3.0 1426 59.4 18,080 12-Sep-
177 RU for cement job. 1.0 1427 59.5 18,080 12-Sep-
178 Pump cement job and set liner hanger. 4.0 1431 59.6 18,080 12-Sep-
179 POOH and circulate out cement. Continue to POOH. 7.0 1438 59.9 18,080 12-Sep.
180 MU 6" bit and 7" casing scraper. 1.0 1439 60.0 18,080 12-Sep-
181 nIH with 7" cleanout assembly. 6.0 1445 60.2 18,080 13-Sep.
182 Wash and drilll cement to liner top. Circuaite hole. 2.0 1447 60.3 18.080 13-Sep.
i 83 POOH. 7.0 1454 60.6 18,080 13-Sep
184 LD BHA. PU mill and 5" casing scraper. 2.0 1456 60.7 18,080 13-Sep
185 R_IH with 7" cleanout assembly. 8.0 1464 61.0 18,080 14-Sep
186 Wash and drilll cement to liner top. 3.0 1467 61.1 18,08~" 14-Sep
187 Circulate hole clean. 6.0 1473 61.4 18,080 14-Sep
188 RU and test 5" liner lap. 2.0 1475 61.5 18,080 14-Sep
189 iChange well over to diesel. 8.0 1483 61.8 18,080 14-Sep
190 Transfer OBM. 1.0 1484 61.8 18,08'0 14-Sep
191 Clean mud pits. 5.0 1489 62.0 18,080 15-Sel~
192 POOH with cleanout assembly. 10.0 1499 62.5 18,080 15-Scl:
193 LD 2-7/8" DP and drill collars. 3.0 1502 62.6 18,080 15-Scl:
1502 62.6 ! 8,080 15-Set:
Perforate 5" Liner and Run 3-1/2" Gas Lift Completion. 1502 62.6 18,080 15-Scl:
194 PU 3-3/8" TCP guns and jeweriy. 3.0 1505 62.7 18,080~ 15-Seg
195 nIH with TCP guns on 3-1/2" DP. 10.0 1515 63.1 18.080 16-Seg
196 ~Set packer. RU surface EQ. Fire guns. Circulate Well. 4.0 1519 63.3 18.080 16-Se[
197 POOH with TCP Guns 10.0 1529 63.7 18.080 16-Se[
198 LD TCP Guns 5.0 1534 63.9 18.o86' 16-Se[
199 RU SWS WLU. 1.5 1536 64.0 18.080 16-SeI
200 PU packer andtail pipe. 1.0 1537 64.0 ' 18.01}0 17-Sel
3P55 AFE est 2.XLS Page 5 of 6 6/25197
Unocal Alaska Business Unit
Granite Point Platform
Well 055
Prepared by: Mitch Damm Date: 6/14/97 Revision #2
Estimate for Grass Roots Oil Well.
UNOCAL
No. Preliminary. Procedure Time i CUM CUM Depth Depth
Estimate[ Time Time In Out
(Hours) ~ (Hours) (Days) (Feet) (Feet)
201 RIH with packer and set on wiretine. 6.0 ] 1543 64.3 18,080
202 POOH 2.5 i 1545 64.4 18.080
203 RD SWS WLU. 0.5 I 1546 64.4 18,080
204 RU to run 3-1:'2" completion. 1.0 i 1547 64.4 18.080
205 PU, rabbit and run 3-1/2" gas lift completion.. 16.0 / 1563 65.1 18.080
206 iSpace out, install SCSSV, control line, and PU hanger. 6.0] 1569 65.4 18.080
207 Land hanger and install packoff. 1.0 1570 65.4 18,080
208 ND BOPE. 4.0 t 1574 65.6 18,080
209 Instatl 3-I/8" block tree and test. 4.0 i 1578 65.7 18.080
210 RU slickline. RIH and pull SCSSV sleeve. 2.0 i 1580 65.8 18.080
211 Turn well over to Production. 0.0 I 1580 65.8 18.080
I 1580 65.8 18,080
212 LD driiipipe and load out eq. on boat. 24.0 ] 1604 66.8 18.080
213 Demob Rig 24.0 I 1628 67.8 18.080
Estimated
Date
17-Set~-9~
!
17-Sep-9~
17-Sep-9~
17-Sep-9~
18-Sep-9~
18-Sep-9'
18-Sep-9'
18-Se~-9'
18-Se~-9'
18-Seo-9'
18-Sep-9
18-Sep-9'
19-Se~-9
20-Se~-9
20-Sep-9
GP55 AFE est 2.XLS Page 6 of 6 $/25197
FILL-UP
BOP
tS%'a000 pm
· m
PIPE RA~S
13¥~'5000 psi
BLIND RAMS
13~/~'S000 pm
FLOW
~'~' ~,3,,~ooo ~..;,~)x~:I(~ CHOKE
LINE __~ S~'OOT.
4" 5000 psi I I 4." 5000 psi
PIPE RAMS
13%'§000 pm ~
,1 ~
LINE---
RISER
5000 pm
coo.
STACK
13%~ 5000 ;)si
6" - 150 tB
01~ RIG
HEADER SEC lION
FROFll VIEW
GAUGE k RE.I,tOIIE P~HEL
1RAHSMIT TER
GAUGE. FLANGE
BEHIND hEADER
x' ·
~000#
3A
Adi;z)~. ¢ ~./3.6" .- iO001
)dS~. 3 1/3.6' - ~.OOOOl~
Fig. ~ 3" Y~B
,~Sltrcez'. 2 ~/],E' -
,':'L'tm'"~- r.W-~
500011:
b~lmco ~ 2 9/3.S' -
4X& X 3 X 3 X~.
R E Cf E~'V E D
UNOCAL )
Grantie Point Field Well tt55
Depth vs. Time Summary
1,000
2,000
3,000
4,000
5,00O
6,000
7,000
8,000
9,000
~ho,ooo
1,000
12,000
13,000
14,000
5,000
16,000
17,000
18,000
GP55 AFE est 2.XLS
0 5 10 15 20 25 30
35
Time (Days)
40 45 50 55 60 65 70
7/1/97/9:30 AM
UNOCAL .;
RKB = 115': 43.44' Rig Floor to Wellhead
Kvaerner SMS Wellhead
TOL @ 14,800' 7
8
C-5 SAND
PDTD = 18,060
MAX HOLE ANGLE = 79° @ 15.477'
O:~DRILLING~SCHEMATIC\GP\GPI~Gp55 prop l.doc
GRANITE POINT PLATFOR3, I
WELL # 55
PROPOSED COMPLETION:
CASING AND TUBING DETAIL
SIZE XVT GRADE CONN TOP BOTTOM
33" Outside conductor
26" Inside Conductor
13-3/8 68 K-55 BTC
9-5/8 47 L-80 BTC
9-5/8 53.5 P-110 BTC
7" 29 P-110 TKC-BTC
7" 29 L-80 TKC-BTC
5" 15 L-80 SC-KC-BTC
Baker 5" HMC liner hanger @ 14,800'
3-1/2" 9.2 L-80 SC BTC
47 229
47 294
47 1,100
46 73
73 4,500
45 6,000
5,960 15,130
14,800 18,141
44 14.820
JEWELRY DETAIL
NO. ITEM
DEPTH
Kvaemer Tubing Hanger 44'
(AB TC-4S Up X STD VAM DWN)
3.6' STD VAM x Buttress Pup JT
HES XXO Safety Valve Landing 300'
Nipple (ID = 2.813")
McMurry-MACCO SMO-1 Gas Lift Mandrels with
1-1/2" Valves:
HES Seal Assembly with Nitrile/Flourel
molded seals
HES Packer
HES "X" Nipple ID = 2.813"
Wireline Muleshoe Re-entry Guide
PERFORATION DATA
TOP BTM ZONE SPF DATE COMMENTS
15,130 18,141 C-5 6 TCP
REVISED: 6/25~97
DRAWN BY: MWD
UNOCAL
GRANITE POINT PLATFORM
WELL #55
DEPTH INTERVAL
0 - 1000' MD, 1000' TVD
17-1/2" HOLE
13-3/8" CASING
MUD TYPE GENERIC MUD #2
MUD ADDITIVES M-I GEL / M-I BAR/SODA ASH /
CAUSTIC SODA / LIME/INLET WATER
POTENTIAL PROBLEMS HOLE CLEANING/GRAVEL I GAS KICK /
LOST CIRCULATION
TREATMENTS/PROCEDURES
1. Drill this interval with inlet water and viscosified sweeps. Build sweeps as
required by hole conditions.
2. Use Durogel and/or FIo-Vis to viscosify inlet water for sweeps.
3. Drill hole.
4. After reaching T.D.' for this interval it may be necessary to spot a viscous pill
on bottom prior to running casing.
Mud Density
Funnel Viscosity
Plastic Viscosity
Yield Point
Gels
Fluid Loss (APl)
Ph
......
ii
'i~iA,~ICI pA'.TED:!::pi~LS',~WEEP$
8.8 - 9.4 ppg
44 - 100 sec/qt
10 - 15 cps
10-30 #/100ft2
8 - 20
No Control
8.5 - 9.5
......
NOTE: DO NOT EXCEEDM.A.C. of products or use products not approved in the
discharge permit. See letter requesting authorization for list of approved products
and M.A.C.
DM-229
(61261971BM) 1 '
UNOCAL
GRANITE POINT PLATFORM
WELL//'55
DEPTH INTERVAL
4500' MD, 4146' TVD 12 ¼" hole
10,115' MD, 8030' TVD 8 ~/~" hole
MUD TYPE #1 GENERIC MUD #2
MUD ADDITIVES
M-I GEL / M-I BAR / SODA
ASH/POLYPAC / SPERSENE / SODIUM
BICARBONATE / CAUSTIC SODA/
INLET WATER
MUD TYPE #2- NO DISCHARGE MAPCO 200 OIL BASE
MUD ADDITIVES
POTENTIAL PROBLEMS
VG-69/M-I BAR/MAPCO 200/
LOWATE/VERSAWET/
VERSACOAT/VERSA HRP/YERSAMOD/
ALCOMER 274/LIME/CACL~
HOLE CLEANING / TIGHT HOLE / BIT
BALLLING / GUMBO CLAYS I HOLE
ENLARGEMENT / GAS KICKS / COAL
SLOUGHING
TREATMENTS/PROCEDU RES
1. Use inlet water to drill the 13 3/8" cement, float collar and casing shoe.
2. Drill the first part of the 12 1/,, interval with inlet water and viscosified
sweeps.
.
Displace to Mapco 200 oil base mud in open hole. Displacement depth should
be between 2000' and 3000'. If possible displacement should occur at the
beginning of a new bit run.
4. Displacement Procedure:
NOTE: Use large mesh shaker screens (30-40) during displacement and for up
to two circulations thereafter. Monitor pump strokes and pump rates
continuously during displacement.
a. Conduct a rig team meeting discussing all aspects of displacement.
NOTE: Rig operations should dictate optimum displacement time.
b. Pump a 50 bbl brine viscous sweep. Pump a 25 bbl Mapco 200 oil mud
viscous sweep. Pump oil mud system stored in beam tank from GP53.
c, Displace in turculent flow ~.-' possible.
d. Reciprocate and rotate driii pipe.
DM-230
(61261971BM) 2
.
Drill the 12 Y," section to T.D. If there are indications that a cuttings bed has
been deposited in the wellbore, the most effective method to clean the
cuttings bed is with mechanical agitation by rotating and reciprocating the drill
string. Maintaining high Iow shear rate rheologies will minimize the formation
of a cuttings bed. Low shear rate rheologies will minimize the formation of a
cuttings bed. Low shear rate rheologies can be elevated with Versamod, Versa
HRP, Alcomer 274 and VG-69. If required, pump high mud weight/high
viscosity sweeps. The 6 and 3 rpm should be maintained at values greater
than 13.
6. Optimize mixing of "dry jobs" in order to minimize the number of wet trips and
any unnecessary increase in mud weight.
OIL MUD MIXING PROCEDURES
7. Build Mapco 200 oil mud system utilizing the following recommendations:
a. Premix and store 10.8 ppg calcium chloride brine.
b. Place Mapco 200 oil in clean mixing tank.
c. Add VG-69 and lime slowly through shear pump to minimize bailing. Shear
for 30 minutes.
d. Add primary emulsifier, Versacoat.
e. Blend for a minimum of 30 minutes.
f. Add calcium chloride brine. Blend for a minimum of 30 minutes.
h. Add Versawet/check rheology/add Versamod.
i. Add barite to required mud weight.
j. Blend for a minimum of 30 minutes.
NOTE: The most important aspect in mixing an oil mud is the amount of mixing
energy put into the fluids while the brine is being added. The more shear
put into the fluid the smaller the water droplets become and the more
viscous the fluid. The emulsions become more stable as more shear is put
into the fluid.
8. After reaching TD, condition the hole for logging by rotating and reciprocating
the drill string. If required, pump high mud weight/high viscosity sweeps.
9. Run and cement the 9 5/8" casing.
lO.Clean 9 5/8" casing and drill 8 ~,~" hole. Mud weights should be kept as Iow
as possible. Centrifuge 8 1/2" hole mud and add Mapco 200 to reduce mud
weight.
DM-229
(61261971BM) 3
11. Maintain Iow shear rate values with VG-69, Versamod, Alcomer 274 and
Versa HRP. Run and cement 7" casing.
Mud Weight ppg 8.5 9.5
PV 15 - 22 25 - 35
YP 15 - 20 15 - 20
Gels 12/25 12140
O/W 80/20 80/20
E.S. 800 + 800 +
HTHP @ 225" F 6 cc 6 cc
3 rpm > 10 > 10
6 rDm > 10 > 10
Mapco 200 bbl
VG-69 ppb
Lime ppb
Versacoat ppb
Versawet ppb
Versamod ppb/Versa HRP/Alcomer
274
CaCI2
Barite/Lowate ppb
Varies w/MW & ORV ratio
4-8
2
4-6
1-2
0-1
34
As Required
NOTE: This mud program is a guideline only. Hole conditions should dictate
actual mud properties.
DM-229
(61261971BM) Z~
VENDOR NO. DATE
1031548 07-01-97
CHECK NO.
200232
I DISCOUNT NET
DATE INVOICE'CREDIT MEMO I'5. VOUCHER NO. GROSS ~
30-JUN-97
DRILLPERMITGP55
07973000001
100. OOI
FORM 4-2B181 (REV. 11,751 PR!NTED ;~'1 U.S.A.
CITIBANK DELAWARE 62-20
A Subsidiary of Citicorp 311
ONE PENN'S WAY
NEW CASTLE, DE 19720
Pay
One Hundred Dollars And
ITOTAL ~.! 100. OOI
Union Oil Company of California
Accounts Payable Field Disbursing
UNOCAL
00 *******************************
2002326
lO0.C
100.(
Date Check Amoum
To the
,order
~f
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION
COMMISSION
3001 PORCUPINE DR
ANCHORAGE, AK 99501
V
01-JUL-97 ******'100.00
Void after s~x months from above date.