Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-0691. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: Surface Casing Repair Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 13,300 feet N/A feet true vertical 10,388 feet 13,102 feet Effective Depth measured 13,201 feet feet true vertical 10,305 feet feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6 / 13CR-80 / NSCT 12,352' 9,588' HXO 12,265' 9,514' Packers and SSSV (type, measured and true vertical depth)SSSV & 1,493' MD & 1,490' TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Chad Helgeson Contact Name: Authorized Title:Operations Manager Contact Email: Contact Phone: Hilcorp Alaska LLC 12,265' 9,514' 7-5/8" TIW Packer WINJ WAG 275 Water-Bbl MD 110' 4,873' 13,287' TVD 110' 4,380 Oil-Bbl N/A measured true vertical Packer Size Junk measured 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: 4. Well Class Before Work: 124 Representative Daily Average Production or Injection Data 3504,582 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 195-069 50-029-22559-00-00 Plugs ADL0047503 5. Permit to Drill Number: ENDICOTT / ENDICOTT OIL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 321-109 384 Authorized Signature with date: Authorized Name: David Gorm dgorm@hilcorp.com 1,850 DUCK IS UNIT SDI 4-32 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 108 Gas-Mcf 1,900 Casing Pressure Tubing Pressure 373 N/A measured Casing Conductor Length 60' 4,832' 13,246' Surface Production 30" 10-3/4" 7-5/8" 4,356' 10,376' 8,180psi Burst N/A 5,210psi 5,140psi 777-8333 2. Operator Name Senior Engineer: Senior Res. Engineer: Collapse N/A 2,470psi PL G Form 10-404 Revised 3/2020 Submit Within 30 days of Operations By Samantha Carlisle at 11:24 am, Apr 26, 2021 Chad Helgeson (1517) 2021.04.24 17:29:19 - 08'00' DSR-4/26/21MGR30JUL2021 RBDMS HEW 4/26/2021 SFD 4/26/2021 END 4-32 CSG Repair Summary 3/1: Found bubbles coming from the conductor and determined it was a casing leak. Shut in well. Bled IA to zero 3/2: Fluid packed OA to try and determine where leak may be at. Started seeing more bubbles in conductor after pumping about 85 gallons of diesel in OA. Pumped total of 95 gallons in OA and pressured up to about 200psi. Did not hold pressure and pressure dropped after about 5-10 mins. Possible leak around 3-5 feet? 3/3: Pulled VR plug on back side of OA and connected N2 and pushed any reaming fluid out front side of OA. Then pulled back side off of OA and lowered string down to try and find fluid level. Was only able to lower about 10” to 12” due to muddy grease like substance. 3 /4 : Removed front OA valve and tried to lower string to check fluid level and was packed with mud. Hooked up diesel from back side to try and determine fluid level by calculating the volume of diesel to fluid pack OA. Took about 16 gallons and pressured up to 100psi and started seeing fluid bubbling from conductor. Total of 28 gallons pumped. Safed out well for well house and flowline removal. Maintenance started disconnecting electrical and instrumentation to prep for wellhouse removal and flowline removal. 3/5: Slickline showed up and rigged up and pulled SSSV and set plug and bled tubing to zero. 3/6: Pulled wellhouse, flowline and G/L line. Well is blinded at wing valve. 3/7: NES removed flooring and started snow removal behind well. Removable planks covering well cellar. 3/8: Pushed N2 from back of OA to front OA for about 10 mins and got nothing but N2 coming though OA. Took back side of OA off and dropped a bobbie into the hole to try and see the fluid level. Bobbie went down about 12” and hit fluid. Also pulled cap off cement return to verify there was no fluid in there and it was full of cement. 3/12: T/IA/OA= 0/0/0. BPV installed 3/13: Cellar floor cut out & removed 3/14: Excavated cellar to 88” below OA vlv & installed temporary shoring wall. 3/15: Excavated to total depth of 112” below OA vlv & lowered temporary shoring wall. Wind conditions did not allow for use of crane to move well support structure. 3/16: Crane to arrive today to move the well support structure. 3-17: Will be hooking up the electrical to the control shack & installing cross brace on WSS to the swivel on wellhead. 3-18: We cut circumferential cuts on conductor. As we were finishing up those cuts the cuts started closing up. Added more pull, up to 42,000 lb. Re-evaluate this morning and start on vertical cuts on conductor. Late start yesterday due to gen-set issues. We are now on shore power. 3-19: Removed conductor and left landing ring in place. All cement chipped off. Did not find the top of the leak. Saw bubbles coming up thru gravel. Determined we will have to excavate another 4 feet or so along with cutting of more conductor to get to the bottom of the leak 3-20: Excavated another three feet, total of 15.8 feet. Encountered a lot of water after 1.5 feet. Working water issues w/vac truck, shut down for night, cut casing and chip cement in AM. 3-21: Cleaned hole out from buffing and chipping, Mistras inspected, drew on grid, pipe looked good for 5 foot patch, working water issues. Plan forward: State inspection this am. Next step weld wedding bands. 3-22: AOGCC came by and did his inspection at 9am and then we vacuum out fluid from OA and then started welding wedding bands on. Should finish welding wedding bands this morning. 3-23: Finished welding wedding bands on and inspection done 24 hr timer started at 10:30am will start welding clam shell on after 24 hr wait is done and inspection is done. 3-24: Welded on External Clamshell 3/25/2021: Pre MIT done blue goo and rapped and started fitting up conductor 3/26/2021: Finished fitting up conductor and welded conductor. Plan forward: State MIT and then back fill hole. 3/27/22021: State MIT passed and filled hole with rock 3/28/2021: Filled conductor with cement left 6 to 12 in to add blue goo and removed cage and cross from well support. Put shipping bolts in to be ready for crane to lift off of well. MEMORANDUM TO: Jim Regg iz P.J. Supervisor i`I FROM: Bob Noble Petroleum Inspector Well Name DUCK IS UNIT SDI 4-32 Insp Num: mitRCN210330072933 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, April 5, 2021 SUBJECT: Mechanical Integrity Tests Itilcorp Alaska, LLC 4-32 DUCK IS UNIT SDI4-32 Sm: Inspector Reviewed By: p P.I. Sup" (— Comm API Well Number 50-029-22559-00-00 Inspector Name: Bob Noble Permit Number: 195-069-0 Inspection Date: 3127/2021 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min RBBL 4-32 Type Inj N -TVD Tubing o 0 0 1950690 Type Test sPT Test psi 1000 � IA o 0 0 0 umped: 1 - BBL Returned: 0.5 CIA o 656 656 - 656 - Interval 0,11 P Notes: Sundry 321-109 Post canine reoair. MIT -OA to 1000 psi. Soft shoe so doubtful that it would hold 1000 psi. 1100 psi put on OA. Bled right down to 656 and held. �c(U-cam V���11 u Prix e�Lu� eenls.s �'edt � �ptikP' Monday, April 5, 2021 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Reggc<< `{ I I �I�vza DATE P. I. Supervisor l l FROM: Lou Laubenstein SUBJECT: Petroleum Inspector 3/24/2021 Surface Casing Leak DIU SDI 4-32 Hilcorp Alaska LLC PTD 1950690; Sundry 321-109 3/22/2021: 1 traveled out to Endicott Satellite Drilling Island to see the surface casing damage and leak on DIU SDI 4-32. - Refer to report dated 3/2/2021 from AOGCC Inspector Matt Herrera for details about the observed leak at surface. I arrived on location and met with Larry McBride and John Allan (both Hilcorp). There was a giant surface gantry lift rigged up using the tubing head as the connection point. The well had been excavated and the conductor cut away exposing the surface casing. Inspection revealed extensive corrosion and two leaks 14 feet down from surface. Hilcorp's plan forward was to weld on a 4-1/2 ft long sleeve around the damaged area. The operation looked very good and all well -organized. Attachments: Photos (12) 2021-0322_Surf _Casing_Repair_DIU 4-32_Il.docx Page 1 of 7 s 4 a b;• ..r Z s'. + ,F' M 4 u i i t I� ti R :y _ 2021-0322_Surf Casing_Repair_DIU 4-32_ll.docx Page 5 of 7 lbA 4�"ifr At w •� 1 y � ti 2021-0322_Surf Casing_Repair_DIU 4-32_ll.docx Page 5 of 7 ul _ by 1 4 !f { r irk Iti V I%Ll IC We ww 1 � Y14 `, a , • '� ' � , f �. ecs.s..�/l �f�.i4r � � �° r"jgi ��j.II • V�' 1 - Z '9c" F v L1 ■3g _ r f t .., I jy j •�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y Jody Colombie at 2:26 pm, Mar 04, 2021  &KDG+HOJHVRQ     X - Well Support Structure required. - Photo document repair. - AOGCC to witness surface casing damage and welded patch. DLB 03/04/2021MGR05MAR21 10-404 DSR-3/4/21&RPP 3/8/21 dts 3/8/2021 JLC 3/8/2021 RBDMS HEW 3/8/2021 ^ƵƌĨĂĐĞĂƐŝŶŐ>ĞĂŬZĞƉĂŝƌ tĞůů͗ϰͲϯϮ Wd͗ϭϵϱϭϱϬ W/͗ϱϬͲϬϮϵͲϮϮϱϱϵͲϬϬͲϬϬ tĞůůEĂŵĞ͗E ϰͲϯϮ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϮϱϱϵͲϬϬͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^/ WƌŽĚƵĐĞƌ ZŝŐ͗E ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗DĂƌĐŚϴƚŚ ͕ϮϬϮϭ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϱ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛ƐƚĚ͍ ĂƚĞZĞŐ͘ƉƉƌŽǀĂů ZĞĐ͛ǀĚ͗ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗dŽŵ&ŽƵƚƐϳϳϳͲϴϯϵϴ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϭϵϱͲϬϲϵ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ĂǀŝĚ'Žƌŵ ;ϵϬϳͿϳϳϳͲϴϯϯϯ ;KͿ ;ϱϬϱͿ ϮϭϱͲϮϴϭϵ ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ &EƵŵďĞƌ͗ tĞůů/ŶƉƵƚƐZĞƋƵŝƌĞĚ͗zĞƐ ƵƌƌĞŶƚ ŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ DĂdžŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ DĂdž͘WƌŽƉŽƐĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ ϯ͕ϵϵϭ ƉƐŝΛϭϬ͕ϬϬϬ͛ds ϯ͕ϵϵϭƉƐŝΛϭϬ͕ϬϬϬ͛ds Ϯ͕ϵϵϭƉƐŝ ;ĂƐĞĚŽŶ ŽĨĨƐĞƚ ^,W^Ϳ ;ĂƐĞĚŽŶŽĨĨƐĞƚ^,W^Ϳ ;DĂdž,WͲ;Ϭ͘ϭƉƐŝͬĨƚdžϭϬ͕ϬϬϬdsͿ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ EϰͲϯϮŝƐĂŐĂƐůŝĨƚĞĚŶĚŝĐŽƚƚƉƌŽĚƵĐĞƌ͘dŚĞǁĞůůǁĂƐ^/ŽŶϯͬϬϭͬϮϭĨŽůůŽǁŝŶŐĂĐŽŶĨŝƌŵĞĚůĞĂŬĨƌŽŵƚŚĞ ĐŽŶĚƵĐƚŽƌǁŝƚŚt,WƐŽĨdͬ/ͬKсϰϬϬͬϭ͕ϵϬϬͬϬ͘dŚĞǁĞůůŽƉĞƌĂƚŽƌǀŝƐƵĂůůLJŝĚĞŶƚŝĨŝĞĚďƵďďůĞƐĐŽŵŝŶŐƵƉďĞƚǁĞĞŶ ƚŚĞĐŽŶĚƵĐƚŽƌĂŶĚƚŚĞƐƵƌĨĂĐĞ^'ĚƵƌŝŶŐĂǁĞůůŝŶƐƉĞĐƚŝŽŶ͘KŶϯͬϬϮͬϮϬϮϭƚƚĞŵƉƚĞĚƚŽƉƌĞƐƐƵƌĞƵƉƚŚĞK ;EŽƚĞ͗KŚĂƐĂŶŽƉĞŶƐŚŽĞͿƚŽϮϬϬƉƐŝƚŽƚĞƐƚĨŽƌĂůĞĂŬ͘dŚĞKƉƌĞƐƐƵƌĞĚƌŽƉƉĞĚĨƌŽŵϮϬϬƉƐŝƚŽϬƉƐŝŝŶϱ ŵŝŶƵƚĞƐ͘ƵƌŝŶŐƚŚĞƉƌĞƐƐƵƌĞƚĞƐƚŝŶĐƌĞĂƐĞĚďƵďďůĞƌĂƚĞƐĂŶĚĂŶŝŶĐƌĞĂƐĞŝŶĨůƵŝĚůĞǀĞůďĞƚǁĞĞŶƚŚĞĐŽŶĚƵĐƚŽƌ ĂŶĚƐƵƌĨĂĐĞĐĂƐŝŶŐǁĂƐŽďƐĞƌǀĞĚ͘ KďũĞĐƚŝǀĞ͗ZĞŵŽǀĞĐŽŶĚƵĐƚŽƌĂŶĚǁĞůĚĂĐĂƐŝŶŐƉĂƚĐŚƚŽƌĞƐƚŽƌĞKŝŶƚĞŐƌŝƚLJ͘ EŽƚĞƐKŶtĞůůďŽƌĞŽŶĚŝƚŝŽŶ͗ x ^ƵƌĨĂĐĞĐĂƐŝŶŐůĞĂŬŝƐĞƐƚŝŵĂƚĞĚΕϱϲ͟ďĞůŽǁƚŚĞKǀĂůǀĞ͘ x ^ƵƌĨĂĐĞĐĂƐŝŶŐǁĂƐŚƵŶŐǁŝƚŚĂĨůƵƚĞĚŵĂŶĚƌĞůŚĂŶŐĞƌƚŚĂƚƐŝƚƐĂďŽǀĞƚŚĞůĂŶĚŝŶŐƌŝŶŐ͘ x ϳͲϱͬϴ͟^'dKʹϭϮ͕ϰϮϬ͛D;>ϳͲϱͲϭϵϵϱͿ x ƐƚŝŵĂƚĞ>ŽĂĚŽŶƚŚĞt,ΕϭϱϬ<ůďƐ x ƵƌƌĞŶƚƐƵƌĨĂĐĞƉƌĞƐƐƵƌĞƐŽŶǁĞůů͕dͬ/ͬKсϭ͕ϬϬϳͬϭϬͬϬ͘ WƌŽĐĞĚƵƌĞ͗ WƌĞͲ^ƵŶĚƌLJtŽƌŬ ^ůŝĐŬůŝŶĞ ϭ͘ D/Zh^>ƵŶŝƚ͘ Ϯ͘ WƌĞƐƐƵƌĞƚĞƐƚůƵďƌŝĐĂƚŽƌƚŽϯϬϬƉƐŝůŽǁĂŶĚĂƚůĞĂƐƚϯ͕ϭϬϬƉƐŝŚŝŐŚ͘ ϯ͘ Z/,ĂŶĚƉƵůůϰ͘ϱ͟ĨƌŽŵϭ͕ϰϵϯ͛D ϰ͘ DhƉůƵŐƚŽŽůƐƚƌŝŶŐĂŶĚƐĞƚĂϰͲϭͬϮ͟;ϯ͘ϴϭϯ͟ͿyƉůƵŐΛϭϮ͕Ϯϱϰ͛ŵĚ͘;EŽƚĞ͗dŚĞd'ƚĂŝůďĞůŽǁƚŚĞ ƉĂĐŬĞƌŚĂƐĨĂůůĞŶŽĨĨ͘Ϳ Ă͘ ůĞĞĚĚŽǁŶƚŚĞƚƵďŝŶŐƉƌĞƐƐƵƌĞƚŽĐŽŶĨŝƌŵƐĞƚ͘ ϱ͘ ZDK WƌĞƉtŽƌŬ ϲ͘ ŝƐĐŽŶŶĞĐƚĨůŽǁůŝŶĞĂŶĚŝŶƐƚƌƵŵĞŶƚĂƚŝŽŶ͘ ϳ͘ sĞƌŝĨLJƚƵďŝŶŐ͕/ĂŶĚKƉƌĞƐƐƵƌĞƐŚĂǀĞďĞĞŶďůĞĚƚŽϬƉƐŝ͘ Contact AOGCC if bottom plug does not hold pressure. Verify fluid level in IA. ^ƵƌĨĂĐĞĂƐŝŶŐ>ĞĂŬZĞƉĂŝƌ tĞůů͗ϰͲϯϮ Wd͗ϭϵϱϭϱϬ W/͗ϱϬͲϬϮϵͲϮϮϱϱϵͲϬϬͲϬϬ ϴ͘ ^ŶŝĨĨĐĞůůĂƌĂŶĚĂĚũĂĐĞŶƚĂƌĞĂǁŝƚŚŵƵůƚŝͲŐĂƐŵĞƚĞƌĨŽƌ>>͕K͕,Ϯ^ĂŶĚϬϮ͘ŶƐƵƌĞĐŽŶĨŝŶĞĚƐƉĂĐĞ͕ ĞŐƌĞƐƐĂŶĚǀĞŶƚŝůĂƚŝŽŶŝƐĂĚĞƋƵĂƚĞĨŽƌŽƉĞƌĂƚŝŽŶƐ͘ŽŶĨŝƌŵƐĂĨĞƚLJƌĞƉĂŶĚĐŽŶĨŝŶĞĚƐƉĂĐĞƉƌŽĐĞĚƵƌĞƐ ŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ^,ĂƌĞĐŽŵƉůĞƚĞǁŚĞŶƉĞƌƐŽŶŶĞůĂƌĞĞŶƚĞƌŝŶŐƚŚĞĐŽŶĨŝŶĞĚƐƉĂĐĞ͘ ϵ͘ sĂĐŽƵƚŐƌĂǀĞůĨƌŽŵǁĞůůĐĞůůĂƌĚŽǁŶƚŽĐĞůůĂƌůŝŶĞƌƚŽƌĞŵŽǀĞƌĞƐŝĚƵĂůŚLJĚƌŽĐĂƌďŽŶƐ͘ƵƚĐĞůůĂƌĨůŽŽƌ ĂŶĚǀĂĐŽƵƚĂĚĚŝƚŝŽŶĂůϯͲϰ͛ŽĨĨŝůůƚŽƉƌŽǀŝĚĞĂĚĞƋƵĂƚĞƐƉĂĐĞĨŽƌĐŽŶĚƵĐƚŽƌƌĞŵŽǀĂů͘ ϭϬ͘ /ŶƐƚĂůůĨŝƌĞďůĂŶŬĞƚƐĂƌŽƵŶĚƚŚĞĐŽŶĚƵĐƚŽƌůĂŶĚŝŶŐƌŝŶŐƚŽƉƌŽƚĞĐƚƐƵƌĨĂĐĞĐĂƐŝŶŐŚŽůĞƐĨƌŽŵŚŽƚ ŵĂĐŚŝŶŝŶŐĚĞďƌŝƐ͘ ^ƵŶĚƌLJtŽƌŬ;ƉƉƌŽǀĂůƌĞƋƵŝƌĞĚƚŽƉƌŽĐĞĞĚͿ ^ƵƌĨĂĐĞĂƐŝŶŐZĞƉĂŝƌ ϭϭ͘ /ŶƐƚĂůůWsĂŶĚŶŝƉƉůĞĚŽǁŶƚƌĞĞĂƚƚŚĞƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌƚŽŵĂŬĞƵƉtĞůůŚĞĂĚ^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞ ĂĚĂƉƚĞƌĨůĂŶŐĞ͘ ϭϮ͘ DŽǀĞŝŶĂŶĚƌŝŐƵƉtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞ͘WůĂĐĞƌŝŐŵĂƚƐĂƐŶĞĞĚĞĚƚŽůĞǀĞůŽƵƚƐƵƉƉŽƌƚƐƚƌƵĐƚƵƌĞ ůĞŐƐ͘ ϭϯ͘ ^ŶŝĨĨĐĞůůĂƌĂŶĚĂĚũĂĐĞŶƚĂƌĞĂǁŝƚŚŵƵƚůŝͲŐĂƐŵĞƚĞƌĨŽƌ>>͕K͕,Ϯ^ĂŶĚϬϮ͘ŶƐƵƌĞĐŽŶĨŝŶĞĚƐƉĂĐĞ͕ ĞŐƌĞƐƐĂŶĚǀĞŶƚŝůĂƚŝŽŶŝƐĂĚĞƋƵĂƚĞĨŽƌŽƉĞƌĂƚŝŽŶƐ͘ ϭϰ͘ WƌĞƉĂƌĞƚŽƚƌĂŶƐĨĞƌůŽĂĚƚŽƚŚĞtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞ͘WƌĞƚĞŶƐŝŽŶůŽĂĚĐĞůůƐĂĐĐŽƌĚŝŶŐƚŽŽƉĞƌĂƚŝŶŐ ŵĂŶƵĂů͘ ϭϱ͘ WƵůůϱϬ͕ϬϬϬůďƐŐƌĂĚƵĂůůLJďƵŝůĚŝŶŐƵƉůŽĂĚŝŶϭ͕ϬϬϬůďŝŶĐƌĞŵĞŶƚƐ͘;dŚĞŽƌĞƚŝĐĂůt,ůŽĂĚʹϭϱϬŬůďƐ͕ ŶĞƵƚƌĂůǁĞŝŐŚƚͿ Ă͘ DŽŶŝƚŽƌ ƚŚĞ ǁĞůůŚĞĂĚ ĨŽƌ ĂŶLJ ƐŝŐŶƐ ŽĨ ŵŽǀĞŵĞŶƚ ĂŶĚ ĚŝƐĐŽŶƚŝŶƵĞ ŝŶĐƌĞĂƐŝŶŐ ƚĞŶƐŝŽŶ ŝĨ ŵŽǀĞŵĞŶƚŽďƐĞƌǀĞĚ͘ ϭϲ͘ ƌŝůůŚŽůĞƐ;ĐŽůĚĐƵƚƚŝŶŐĚƌŝůůďŝƚͿŝŶƚŚĞĐŽŶĚƵĐƚŽƌƌŽƵŐŚů LJϮĨƚĂŶĚϱĨƚďĞůŽǁƚŚĞůĂŶĚŝŶŐƌŝŶŐ͘ ϭϳ͘ &ůƵƐŚĐŽŶĚƵĐƚŽƌǁŝƚŚǁĂƚĞƌĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌƐƚĂƌƚŝŶŐŚĞĂĚǀĂůǀĞĂŶĚďƵůůƉůƵŐǁŚŝůĞƚĂŬŝŶŐĨůƵŝĚ ƌĞƚƵƌŶƐĨƌŽŵƚŚĞĐĞŵĞŶƚƌĞƚƵƌŶůŝŶĞďƵůůƉůƵŐ͘&ůƵƐŚƵŶƚŝůĐůĞĂŶƌĞƚƵƌŶƐĂƌĞŽďƐĞƌǀĞĚ͘ ϭϴ͘ /ŶƐƚĂůůEϮƉƵƌŐĞĞƋƵŝƉŵĞŶƚĨŽƌƚŚĞĐŽŶĚƵĐƚŽƌĂŶĚK͘ Ă͘ hƐĞŽĨĂŶEϮĐĂƉͬƉƵƌŐĞǁŝůůďĞĚĞƚĞƌŵŝŶĞĚŽŶƐŝƚĞ͕ƉƌŝŽƌƚŽƉƌŽĐĞĞĚŝŶŐ͕ǁŝƚŚĂĐĐƵƌĂƚĞŐĂƐ ƌĞĂĚŝŶŐƐĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽďƐĞƌǀĞĚ͘ ď͘ WƌŝŽƌƚŽĐƵƚƚŝŶŐĐŽŶĚƵĐƚŽƌ͕ŝŶƐƚĂůůĐŽŶƚŝŶƵŽƵƐŐĂƐŵŽŶŝƚŽƌŝŶŐĨŽƌ>>͛ƐĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌ͘ ϭϵ͘ ƵƚĂŶĚƌĞŵŽǀĞĐŽŶĚƵĐƚŽƌĨƌŽŵĂďŽǀĞƚŚĞϱĨƚŝŶƐƉĞĐƚŝŽŶŚŽůĞƐ͘ Ă͘ WƌŝŵĂƌLJĐƵƚƚŝŶŐŽƉƚŝŽŶŝƐƚŽƵƐĞĂŶĂŝƌĂƌĐƚŽƌĐŚďƵƚƚŚĞ,ŽƚtŽƌŬWĞƌŵŝƚĨŽƌƚŚŝƐƉŽƌƚŝŽŶŽĨƚŚĞ ũŽďǁŝůůĚŝĐƚĂƚĞŝĨĂŶĂůƚĞƌŶĂƚŝǀĞĐƵƚƚŝŶŐŵĞƚŚŽĚǁŝůůďĞƌĞƋƵŝƌĞĚ͘ ď͘ dǁŽŚŽƌŝnjŽŶƚĂůĐƵƚƐ;ďĞůŽǁůĂŶĚŝŶŐƌŝŶŐĂŶĚŽŶĞĂƚďŽƚƚŽŵŽĨĐŽŶĚƵĐƚŽƌƐĞĐƚŝŽŶͿĂŶĚƚǁŽǀĞƌƚŝĐĂů ĐƵƚƐǁŝůůďĞƌĞƋƵŝƌĞĚƚŽƌĞŵŽǀĞƚŚĞĐŽŶĚƵĐƚŽƌ͘ůƚĞƌŶĂƚĞůLJ͕ŝĨƚŚĞƌĞŝƐŶŽƚƐƵĨĨŝĐŝĞŶƚƌŽŽŵƚŽ ĚƌŽƉƚŚĞůĂŶĚŝŶŐƌŝŶŐďĞůŽǁƚŚĞƉĂƚĐŚĂƌĞĂ͕ƚŚĞǀĞƌƚŝĐĂůĐƵƚŵĂLJďĞĐĂƌƌŝĞĚĂůůƚŚĞǁĂLJƵƉĂŶĚ ƚŚƌŽƵŐŚƚŚĞůĂŶĚŝŶŐƌŝŶŐ͘ ϮϬ͘ ZĞŵŽǀĞĐĞŵĞŶƚĂƐŶĞĞĚĞĚƚŽĐŽŶĨŝƌŵǁĞůĚĂďůĞ͕ƵŶĐŽƌƌŽĚĞĚƐƵƌĨĂĐĞĐĂƐŝŶŐĂƚŚŽůĞĚĞƉƚŚ͘ŚŝƉĂǁĂLJ ĞdžĐĞƐƐĐĞŵĞŶƚĨƌŽŵƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐ͘ƵĨĨĂŶĚƉƌĞƉĂƌĞƐƵƌĨĂĐĞĐĂƐŝŶŐĨŽƌŝŶƐƉĞĐƚŝŽŶĂŶĚǁĞůĚŝŶŐ͘ Ϯϭ͘ /ŶƐƉĞĐƚŝŽŶĚĞƉĂƌƚŵĞŶƚƚŽƵƐĞƚŚĞƌĞĂĨŽƌŵƚŽŽůƚŽŝŶƐƉĞĐƚƚŚĞ^ƵƌĨĂĐĞ^'ƚŚĞŶhdƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐ ǁŚĞƌĞǁĞƉůĂŶƚŽǁĞůĚ͘ ď͘ /ŶƐƉĞĐƚĨŽƌĂŶLJĂĚĚŝƚŝŽŶĂůŚŽůĞƐďĞůŽǁůĂŶĚŝŶŐƌŝŶŐ͘ Đ͘ ƌĞĂƐƚŽƉĂƚĐŚƚŽďĞŝĚĞŶƚŝĨŝĞĚŵĂƌŬĞĚĂŶĚŝŶƐƉĞĐƚĞĚŽŶĂŐƌŝĚƚŽĞŶƐƵƌĞĐŽŵƉĞƚĞŶĐLJĨŽƌǁĞůĚƐ ϮϮ͘ ǀĂůƵĂƚĞ ƐƵƌĨĂĐĞ ^' ŝŶƐƉĞĐƚŝŽŶ ƌĞƐƵůƚƐ ǁŝƚŚ KƉĞƌĂƚŝŽŶƐ ŶŐŝŶĞĞƌ͘  ĂƐĞĚ ŽŶ ƚŚĞ ŝŶƐƉĞĐƚŝŽŶ ƌĞƐƵůƚƐͬ^'ĐŽŶĚŝƚŝŽŶƚŚĞĚĞĐŝƐŝŽŶŽŶ^'ƉĂƚĐŚǁŝůůďĞŵĂĚĞ͘ Ă͘KƉƚŝŽŶϭʹŽŶĨŝƌŵĨŝŶĂůtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞůŽĂĚǁŝƚŚKƉƌŝŽƌƚŽǁĞůĚŝŶŐƉĂƚĐŚ͘tĞůĚ džƚĞƌŶĂůůĂŵ^ŚĞůůĂƌŽƵŶĚƚŚĞĐŽƌƌŽĚĞĚƐĞĐƚŝŽŶŽĨƐƵƌĨĂĐĞ^'͘ Notify inspector to witness. Document with photos for 10-404. ^ƵƌĨĂĐĞĂƐŝŶŐ>ĞĂŬZĞƉĂŝƌ tĞůů͗ϰͲϯϮ Wd͗ϭϵϱϭϱϬ W/͗ϱϬͲϬϮϵͲϮϮϱϱϵͲϬϬͲϬϬ ŝ͘ EŽƚĞƚŚĂƚƚŚĞƌĞŝƐĂƉƵƉũŽŝŶƚǁŝƚŚĐŽůůĂƌĞĚĐŽŶŶĞĐƚŝŽŶďĞůŽǁƚŚĞƐƚĂƌƚŝŶŐŚĞĂĚƚŚĂƚŵĂLJ ŶĞĞĚƚŽďĞƐƚƌĂĚĚůĞĚƚŽǁĞůĚƚŽŐŽŽĚŵĞƚĂůĂďŽǀĞĂŶĚďĞůŽǁůĞĂŬ͘ ŝŝ͘ ŝƌĐƵŵĨĞƌĞŶƚŝĂůůLJǁĞůĚďĂŶĚͬƐƉĂĐĞƌƌŝŶŐƐƚŽƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐĨŽƌƚŚĞƵƉƉĞƌĂŶĚůŽǁĞƌ ƉĂƚĐŚĂƌĞĂƐ ŝŝŝ͘ ĂŶĚŵĂƚĞƌŝĂů͗ϱϭϲͲϳϬ͕/сϭϬ͘ϳϱ͟ƚŚŝĐŬŶĞƐƐс͘ϳϱ͘͟ ŝǀ͘ KŶĐĞŶĞƵƚƌĂůůLJůŽĂĚĞĚ͕ďĞŐŝŶƉƌĞŚĞĂƚŝŶŐĂƐƉĞƌǁĞůĚŝŶŐƉƌŽĐĞĚƵƌĞĨŽƌĐůĂŵƐŚĞůůƉĂƚĐŚ ǀ͘ DŽŶŝƚŽƌůŽĂĚŽŶtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞŝŶĂĚĚŝƚŝŽŶƚŽǁĞůůŚĞĂ ĚǀĞƌƚŝĐĂůĚŝƐƉůĂĐĞŵĞŶƚ ĚƵƌŝŶŐŚĞĂƚŝŶŐŽƉĞƌĂƚŝŽŶƐ͘ ǀŝ͘ DĂŝŶƚĂŝŶ ĐŽŶƐƚĂŶƚ ǀĞƌƚŝĐĂů ĚŝƐƉůĂĐĞŵĞŶƚ ŝŶ ƚŚĞ ĞǀĞŶƚ ƚŚĂƚ ƐƵƌĨĂĐĞ ĐĂƐŝŶŐ ŝŶƚĞŐƌŝƚLJ ŝŵƉĂĐƚĞĚĚƵƌŝŶŐŚĞĂƚŝŶŐ͘ ǀŝŝ͘ /ŶƐƚĂůů ĐůĂŵƐŚĞůů ƉĂƚĐŚ ĂŶĚ ǁĞůĚ ĐŝƌĐƵŵĨĞƌĞŶƚŝĂůůLJ ƚŽ ƚŚĞ ŵĂĐŚŝŶĞĚ ĨůƵƚĞƐͬƌŝŶŐ ĂŶĚ ǀĞƌƚŝĐĂůůLJƚŽƚŚĞŽƚŚĞƌƉĂƚĐŚŚĂůĨ͘ ǀŝŝŝ͘ WĂƚĐŚŵĂƚĞƌŝĂů͗ϱϭϲͲϳϬ͕/сϭϮ͘Ϯϱ͟ƚŚŝĐŬŶĞƐƐсϭͬϮ͘͟ ď͘KƉƚŝŽŶϮʹŽŶĨŝƌŵĨŝŶĂůtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞůŽĂĚǁŝƚŚKƉƌŝŽƌƚŽǁĞůĚŝŶŐƚŚĞƉĂƚĐŚ͘ƵƚŽƵƚ ĐŽƌƌŽĚĞĚƐĞĐƚŝŽŶŽĨϭϬͲϯͬϰ͟ϰϱ͘ϱηƐƵƌĨĂĐĞ^'͘ ŝ͘ DŽŶŝƚŽƌůŽĂĚŽŶƚŚĞtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞŝŶĂĚĚŝƚŝŽŶƚŽǁĞůůŚĞĂĚǀĞƌƚŝĐĂůĚŝƐƉůĂĐĞŵĞŶƚ ĚƵƌŝŶŐĐƵƚƚŝŶŐͬŚĞĂƚŝŶŐŽƉĞƌĂƚŝŽŶƐ͘ ŝŝ͘ ƵƚŽƵƚĂǁŝŶĚŽǁŝŶƚŚĞϭϬͲϯͬϰ͟ƐƵƌĨĂĐĞ^'ƚŽĐŚĞĐŬůŽĐĂƚŝŽŶŽĨϳͲϱͬϴ͟WƌŽĚƵĐƚŝŽŶ^'͘ ƵƚƌĞƐƚŽĨϭϬͲϯͬϰ͟ƐƵƌĨĂĐĞ^'ŽƵƚĐĂƌĞĨƵůůLJĞŶƐƵƌŝŶŐƚŽŶŽƚĐƵƚƚŚĞϳͲϱͬϴ͟^'͘ ŝŝŝ͘ /ŶƐƚĂůůŶĞǁƐĞĐƚŝŽŶŽĨϭϬͲϯͬϰ͟ϰϱ͘ϱη>ͲϴϬ^'͘ŝƌĐƵŵĨĞƌĞŶƚŝĂůůLJǁĞůĚƚŽƚŚĞƐƵƌĨĂĐĞ ĐĂƐŝŶŐĨŽƌƚŚĞƵƉƉĞƌĂŶĚůŽǁĞƌƉĂƚĐŚĂƌĞĂƐ͘ Ϯϯ͘ /ŶƐƉĞĐƚƚŚĞǁĞůĚƐƚŽĞŶƐƵƌĞĐŽŵƉĞƚĞŶĐLJ͘ Ϯϰ͘ ŽŶĚƵĐƚĂD/dͲKƚŽϭ͕ϬϬϬƉƐŝƚŽĐŽŶĨŝƌŵ^ŝŶƚĞŐƌŝƚLJ Ă͘ dŚĞKŚĂƐĂŶŽƉĞŶƐŚŽĞ͕ƚŚĞKŝƐŶŽƚĞdžƉĞĐƚĞĚƚŽŚŽůĚϭ͕ϬϬϬƉƐŝƐŽůŝĚ͘WůĂŶƚŽŽďƐĞƌǀĞƉƌĞƐƐƵƌĞ ĨĂůů ŽĨĨ ƵŶƚŝů Ă ƐƚĂďůĞ ƉƌĞƐƐƵƌĞ ŝƐ ŽďƚĂŝŶĞĚ͘ ƵƌŝŶŐ ƚŚĞ ƉƌĞƐƐƵƌĞ ƚĞƐƚ ŵŽŶŝƚŽƌ ƚŚĞ ƐƵƌĨĂĐĞ ^'ͬŽŶĚƵĐƚŽƌ ĂŶŶƵůƵƐ ĨŽƌ ĐŽŵŵƵŶŝĐĂƚŝŽŶ͘ EŽƚŝĨLJ ƚŚĞ ŽƉĞƌĂƚŝŽŶƐĞŶŐŝŶĞĞƌ ƚŽ ƌĞǀŝĞǁ ƚŚĞ ƉƌĞƐƐƵƌĞƚĞƐƚƌĞƐƵůƚƐďĞĨŽƌĞƉƌŽĐĞĞĚŝŶŐ͘ Ϯϱ͘ 'ƌĂĚƵĂůůLJƌĞůĞĂƐĞǁĞůůŚĞĂĚůŽĂĚĨƌŽŵtĞůů^ƵƉƉŽƌƚ^ƚƌƵĐƚƵƌĞďĂĐŬŽŶƚŽƉĂƚĐŚĞĚƐƵƌĨĂĐĞĐĂƐŝŶŐ͘ Ϯϲ͘ hŶďŽůƚĂŶĚƌĞŵŽǀĞƚŚĞĂĚĂƉƚĞƌĨůĂŶŐĞ͘ Ϯϳ͘ ZĞŝŶƐƚĂůůϱ<ƉƌŽĚƵĐƚŝŽŶƚƌĞĞ͘ Ϯϴ͘ ZĞŵŽǀĞWsĂŶĚŝŶƐƚĂůůdt͘WƌĞƐƐƵƌĞƚĞƐƚƚƌĞĞƚŽϱ͕ϬϬϬƉƐŝ͘ Ϯϵ͘ ZĞͲŝŶƐƚĂůůĨůŽǁůŝŶĞĂŶĚŝŶƐƚƌƵŵĞŶƚĂƚŝŽŶ͘ ϯϬ͘ ZĞŵŽǀĞdt͘ ^ůŝĐŬůŝŶĞ ϯϭ͘ D/Zh^>ƵŶŝƚ͘ ϯϮ͘ WƌĞƐƐƵƌĞƚĞƐƚƚŽϯϬϬƉƐŝůŽǁĂŶĚĂƚůĞĂƐƚϯ͕ϭϬϬƉƐŝŚŝŐŚ͘ ϯϯ͘ Z/,ĂŶĚƉƵůůϰͲϭͬϮ͟;ϯ͘ϴϭϯ͟ͿyƉůƵŐĨƌŽŵϭϮ͕Ϯϱϰ͛ŵĚ͘ ϯϰ͘ Z/,ĂŶĚƐĞƚϰ͘ϱ͟Ăƚϭ͕ϰϵϯ͛D ϯϱ͘ ZDK ϯϲ͘ dƵƌŶǁĞůůďĂĐŬŽǀĞƌƚŽƉƌŽĚƵĐƚŝŽŶ WŽƐƚZĞƉĂŝƌtŽƌŬ ϯϳ͘ tĞůĚĐƵƚĐŽŶĚƵĐƚŽƌŚĂůǀĞƐďĂĐŬŽŶƚŽĐŽŶĚƵĐƚŽƌ͘ ϯϴ͘ ZĞŝŶƐƚĂůůǁĞůůŚŽƵƐĞĂŶĚďĂĐŬĨŝůůŐƌĂǀĞůŽǀĞƌĐĞůůĂƌůŝŶĞƌ͘ ϯϵ͘ ĞŵĞŶƚ^ďLJŽŶĚƵĐƚŽƌŶŶƵůƵƐďĂĐŬƚŽǁŝƚŚŝŶϭĨƚŽĨĐŽŶĚƵĐƚŽƌƚŽƉ͘ ϰϬ͘ /ŶƐƚĂůůŽƌƌŽƐŝŽŶ/ŶŚŝďŝƚŽƌŝŶ^ďLJŽŶĚƵĐƚŽƌŶŶƵůƵƐƵƉƚŽ ƚŚĞĐŽŶĚƵĐƚŽƌƚŽƉ͘ ^ƵƌĨĂĐĞĂƐŝŶŐ>ĞĂŬZĞƉĂŝƌ tĞůů͗ϰͲϯϮ Wd͗ϭϵϱϭϱϬ W/͗ϱϬͲϬϮϵͲϮϮϱϱϵͲϬϬͲϬϬ ƚƚĂĐŚŵĞŶƚƐ͗ ͲtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ MEMORANDUM TO: Jim Regg ��� 3I'q—n a P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: FROM: Matt Herrera SUBJECT: Petroleum Inspector 3/2/2021 Wellhead Leak Duck Island Unit SDI 4-32 PTD 1950690 3/2/2021: On 3/2/2021 1 traveled to Hilcorp's Endicott Satellite Drilling Island to investigate a wellhead leak found by Operations during wellhouse checks. I met with Drillsite Operator John Houser and discussed what was found at Well 4-32 and their plan forward to address the issue. The cellar was dry and clean with no debris. The wellhead had what looked like calcium stains but no obvious leaks from piping or flanges. The casing head flutes had water in them and that was where the bubbling was coming from. Mr. Houser could not confirm if any LEL readings were taken. The bubbling was slight — maybe once every minute and a half; nothing to warrant or suggest an explosive or unsafe atmospheric condition. Operations suspects a surface casing leak and their plan forward is to have Slickline set a tubing plug and conduct MIT -T, MIT -IA and MIT -OA to try and determine which casing string is leaking and where communication is coming from. Well is currently shut in and is being monitored. Attachments: Photos (6) 2021-0302_Well_Integrity_DIU_4-32 mh.docx Page 1 of 4 Well Integrity — DIU 4-32 (PTD 1950690) Photos by AOGCC Inspector M. Herrera 3/2/2021 2021-0302_Well_lntegrity_DIU_4-32_mh.docx Page 2 of 4 2021-0302_Well _Integrity_DN_4-32_tnh.docx Page 3 of 4 ■I M/ _. l J CAUTION { h 2021-0302_Well _Integrity_DN_4-32_tnh.docx Page 3 of 4 • • RECEIVEDPost Office Box 244027 Anchorage,AK 99524-4027 JUL 3 0 f� Hilcorp Alaska,LLC 201,.1 3800 Centerpoint Drive Suite 100 AOGCCAnchorage,AK 99503 Phone: 907/777-8300 July 29, 2015 Fax: 907/777.-8301 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 5. 0(6' 5 Anchorage, AK 99501 Re: Duck Island Unit Well Renaming Request SCANNED SEP 0 12016 Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "/" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/T34" (PTD # 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp I — • Orig * New API WeliNo • I PermitNumberl WellName I WellNumber I WellNumber 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/J32 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/L36 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/J39 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/137 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/035 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/J40 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49AJ40XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/Q28 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/032 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/Q30 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/S30 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/K34 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/K41 4-50 bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 22, 2012 5 Mr. Jim Regg (e) Alaska Oil and Gas Conservation Commission 333 West 7 Avenue 14 _ Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of Endicott Row 4 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 4 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Endicott Row 4 Date: 10/07/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal END4-02 1 Q-28 1880220 50029217890000 0.3 NA 0.3 NA 1.70 9/29/2010 EN D4-04 / T -30 2090190 50029219680100 4 2.0 0.8 9/2/2010 3.40 9/29/2010 END4 -06A / 0-30 1961660 50029217230100 4 3.0 0.1 9/6/2010 2.55 9/30/2010 END4 -08 / P -27 1870080 50029216920000 5 3.0 0.8 9/2/2010 6.00 9/30/2010 EN D4-10A / L -28 2022380 50029224640100 15 12.5 0.5 9/6/2010 1.70 9/30/2010 END4 -14A / S -37 2080120 50029218630100 0.3 NA 0.3 NA 1.70 9/30/2010 END4 -18 / S -30 1881490 50029218960000 7 2.0 0.8 9/2/2010 4.30 9/30/2010 END4-20 / M-35 1861730 50029216400100 1.5 0.5 0.4 9/6/2010 2.55 10/4/2010 END4-26 / 0-34 1880720 50029218350000 1.2 NA 1.2 NA 10.20 10/4/2010 END4 -28 / N -37 1881110 50029218700000 2 1.0 0.5 9/6/2010 3.40 10/4/2010 ___.4 END4 -32 / K-38 1950690 50029225590000 6 6.0 0.7 9/2/2010 6.80 10/4/2010 END4 -34 / 0-38 1961550 50029227050000 4 1.0 0.3 9/6/2010 1.70 10/4/2010 END4 -38 / K-34 1940740 50029224820000 10 7.0 0.3 9/6/2010 1.70 10/4/2010 END4 -40 / P-43 1920420 50029222650000 1.5 0.3 0.4 9/6/2010 3.40 10/4/2010 END4 -42 / P -38 1870560 50029217310000 0.5 NA 0.5 NA 3.40 10/4/2010 END4 -44 / M-44 1920190 50029222540000 1.5 0.3 0.5 9/6/2010 1.70 10/4/2010 END4 -46 / N -39 1890690 50029219570000 3 2.5 0.8 9/6/2010 5.10 10/4/2010 END4 -48 / K-43 1890970 50029219720000 4 2.0 0.8 9/6/2010 5.10 10/4/2010 END4-50 / K-41 1890440 50029219400000 1.3 0.1 0.3 9/6/2010 1.70 10/4/2010 oN ggFo AO,3CC Znd'¥v'¥dua'i ~,,,/eii "Y~. I } ~ O O '..'~ e o i o g 'i c a 1 H ,'a t e r" ~i a 1 s :.r.. n v e n t o r' y P E R i'4 il: T' D A T A T D A T A.._? k U S 95-069 6?63 ~"~'11730- '13260 DIFL/CN/GR 95~'069 BHP .d~. '12700 .... 132E, 0 9.5 .... 069 95-.-069 95~069 95 .... 069 95., -~ 069 DiFI~/GR/SF' ~<~. '11730-13260 FHT/GF?. /...-1~' 12833 .... i:3i88 95 Y- 069 F' Z '1-' S 95-.- 069 PROD PROFILE 95 .... 069 PROD PROFZLE 95- 069 SBT/,SR/CC L. 95 ..... 069 S S TVD 95-069 ~.4¢~. -11870-.12~00 ...~.br-~1o700-179'~1~ ~. ~ ...ub-~12700-12980 1'267~-~'i297~ 'i2700~.12980 12050--13172 I17~0 .... i3260 R UN DATE__R ECVD 1 0 ?/' 1o/..q5° .. ! 07//'i 8/'95 I 07 / 18 ,/95 O. / '1 o'" ,,.' . .., i () 7/' 2/~ / 95 I 07/' 2 a / g 5 , i 09 / 28 / 95 'i 09 / 'i ~:,-, / .:., ~:~ ..,r< 1 08/'21/95 'l 09/' '1 h.//95 1 07/' 2L~/95 'i [) 7/" '18 / 95 'J 0 '~ / 'l 8/' 95 We I 'l 'i' s C 0 ki I','1 E N T S TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 TO: FROM: Wendy Mahan w~ Natural Resource Officer David W. Johnston, Tuckerman Babcock, Commissioher Leak-OffTests at Endicott DATE' 21 Oct 96 There is a possibility that some leak-off tests within the Endicott Field may not have been properly conducted. ~ ~'5 ~ [~ci Specifically, leak-off tests ofi 1-3~, 3-37 and 4-32. Commissioner Johnston and I have discussed this matter and re'qued2 that you initiate an investigation to determine whether these tests were properly conducted under our standard of good oilfield engineering practices. Please feel free to rely on Mr. Wondzell and the inspectors for assistance. The allegations are serious and your investigation should be conducted with deliberate speed and tempered by discretion. Commissioner Johnston and I will assist you in any way possible. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS · Operations performed: Operation shutdown __ Stimulate__ Plugging__ Pull tubing __ Alter casing __ Repair well __ Perforate X Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service __ 4. Location of well at surface 2600' NSL, 677' WEL, SEC 8, T11N, R17E At top of productive interval 1229' NSL, 332' WEL, SEC. 4, T11N, R17E At effective depth 1323' NSL 142' WEL, SEC. 4 T11N, R17E At total depth 1347' NSL, 93' WEL, SEC. 4, T11N, R17E O.?,iGINAL 6. Datum elevation (DF or KB) 56' feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 4-32/K-38 9. Permit number/approval number 95-69/not required 10. APl number 50- 02922559 11. Field/Pool 12. Present well condition summary Total depth: measured true vertical 13300' feet Plugs (measured) 10338 feet BKB AUG 1 199t Effective depth: measured true vertical 13201 feet Junk (measured) Tailpipe and~~~j$C.~t~fmi~JDIl 10305 feet BKB ~h0ra~l~ Casing Length Size Cemented Measured depth True vertical depth Structural BKB BKB Conductor 60' 30" Driven 110' 110' Surface 4832' 10-3/4 743 sx PF'E', 668sx'G' 4873' 4300' Intermediate Production 13246' 7-5/8" 450sx Class 'G' 13287' 10320' Liner Perforation depth: measured 12862'- 12866', 12882; 12886' (all squeezed) 12820; 12860' (open) true vertical 9966'-9969', 9983'-9986' (all squeezed) 9930'-9964' (open) Tubing (size, grade, and measured depth) 4-1/2", 12.6#/ft. 13CR-80, NSCT@ 12352' Packers and SSSV (type and measured depth) 7-5/8" TIW Packer @ 12265', SSSV @ 1493' 13. Stimulation or cement squeeze summary Scale Inhibitor Treatment (12/22/95) Intervals treated (measured) 12820'-12680' Treatment description including volumes used and final pressure 27 bbls Seawater/Mutual Solvent Mix, 140 bbls Seawater/Scale Inhibitor Mix, 339 bbls Seawater/2% surfactant mix, 212 bbls Seawater Tubing Volume. FSlWHP=125=psi 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 1019 289 2900 718 297 3608 Tubing Pressure 370 361 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby ce~dj.fy that the foregoing is true and correct to the best of my knowledge. Signed ~-..~t ~.~ /~-~~~(~,,~.''') Title Senior TechnicalAssistant lV Form 10-404 R~v/06/15~88 '~ V SUBMIT IN DUPLICATE Endicott Production Engineering Department DATE: 9/13/95 WELL N-°: 4.32/K-38 BP EXPLORATION REP: SERVICE COMPANY: RE-PERFORATE POWERS ATLAS/BARBA DATE/TIME OPERATIONS SUMMARY I 9:00 MIRU. FWHP=320 PSIG, IAP=1700 PSIG, OAP=450 PSIG, WHT=95 9:30 SI WELL AND PT LUBRICATOR. 9:50 RIH WITH GUN #1, 20' 3-3/8" 6 SPF ALPAHA JET/CCL/GR 11:00 POP WELL AT 80 BEANS AND TIE-IN TO DILL DATED6/30/95. 11:25 SHOOT GUN # 1 FROM 12840' TO 12860'. LOST 50 LBS. LOG OFF. FLAG LINE FOR NEXT RUN. 11:35 SI WELL AND POOH. 12:30 RIH WITH GUN # 2 (20' ALPHA JET) 13:10 POP WELL FROM SIP=900 PSIG. TIE-IN AT FLAG. HAD A DIFFICULT TIME TIEING-IN DUE TO THE WELL LIFTING THE GUN AND DRAGING THROUGH THE INTERVAL. 6TH TIME WAS THE CHARM. 14:30 SHOOT GUN # 2 FROM 12820' TO 12840'. LOG OFF. 14:45 SI WELL AND POOH. PULLED SOME WIEGHT COMING INTO TUBING. 15:30 AT SURFACE. ALL SHOTS HAVE FIRED. POP WELL WITH LIFTGAS. TURN WELL OVER TO OPERATIONS. 1 6:30 RELEASE ATLAS. PERFORATION SUMMARY: GUN 1 2 DEPTH ' LENGTH SUBZONE 12840'-12860' 20' 3A2 12820'-12840' 20' 3A2 All guns were shot using 3-3/8" Alpha jet HSC with 6 SPF, 60° phasing and random orientation. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ,CELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~ 6~'AS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc 95-69 3. Address 8. APl Number P. O. BOX 196612, Anchora~le, Alaska 99519-6612 5o- 029-22559 4. Location of well at surface 9. Unit or Lease Name 2600' NSL, 677' WEL, SEC 8, T11N, R 17E ~ ..... Duck Island Unit/Endicott i'_~{~..'!~~ 10. Well Number At Top Producing Interval ! ~~,, i i-'" ~' 4-32/K-38 1229'NSL, 332' WEL, SEC. 4, T11N, R17E ~- .......... ti. Field and Pool At Total Depth -.~.'.;~ ._. i:. :; . Endicott Fie/d/Endicott Pool 1347' NSL, 93' WEL, SEC. 4, T11N, R17E .............. ~. ., 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 56' I ADL 047503 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 06/11/95 06/29/95 07/19/95I 6'- 12' feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 12o. Depth where SSSV set 121. Thickness of Permafrost 13300'MD/10388'TVD 13201'MD/10305'TVD YES [] NO []I 1493 feet MD I 1465'(Approx.) I 22. Type Electric or Other Logs Run DIL, GR, GYRO, MWD, SP, DIFL, CN, ZDL, CBL 23. CASING, UNER AND CEMENTING RECORD SETRNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP DO'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 30" Structure Drive Surface 110' 30" Drive 10-3/4" 45.5# NT80 Surface 4873' 13-1/2" 743 sx PF 'E', 668 sx 'G' 7-5/8" 29. 7# NT80S Surface 13287' 9-7/8" 450 sx Class 'G' !24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET (MD) 3-3/8" gun diameter, 4 spf 4-1/2", 13CR80 12352' 12269' MD TVD (ss) 12862'- 12866' Sqzd 9966'- 9969' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12882'- 12886' Sqzd 9983'- 9986' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12820'- 12860' Open, 6 spf 9930'- 9964' Freeze protect wi 60 bbls diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 07/19/95 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. AJas~ca Oii & O~s Cons. A~choraga Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ,.. (Subsea) THRZ 12480' 9640' Kekiktuk 12811' 9922' K3A 12811' 9922' K2A 13108' 10172' 31. LIST OF A'I-I-ACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .~-J-/,~ _. .~ .~L~.~ TitleSeniorDd//ingEn.q/neer Date ////~,/¢~' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. .'-~' ~.,-- ~~ ~[~,,..¥~.~.~.~ .~' i" ,¢~'O~:~ ~..;,~ ;~ Item 28: If no cores taken, indicate "none". FEB 1996 Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: SDI 4-32/K-38 BOROUGH: NORTH SLOPE UNIT: ENDICOTT FIELD: ENDICOTT LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 0.6/12/95 09:30 SPUD: 06/12/95 09:30 RELEASE: 07/11/95 07:00 OPERATION: DRLG RIG: DOYON 15 WO/C RIG: DOYON 15 06/13/95 ( 1) TD: 713'( 0) 06/14/95 ( 2) TD: 2640' (1927) 06/15/95 (3) TD: 3750' (1110) 06/16/95 ( 4) TD: 4902' (1152) 06/17/95 ( 5) TD: 4902' ( 0) 06/18/95 ( 6) TD: 5200' ( 298) 06/19/95 ( 7) TD: 6728' (1528) DRILLING MW: 0.0 ViS: 0 MIRU. FUNCTION TEST DIVERTER. BOBBY FOSTER W/AOGCC WAIVED WITNESS. DRILL F/42 T/713. DRILLING MW: 0.0 ViS: 0 DRILL & SURVEY F/713 T/1759. TOOH & CHK F/WASH OUT. TIH. OK. DRILL T/2460. CBU. HAVING PROBLEMS STEERING. DRILLING MW: 0.0 ViS: 0 POOH BREAK BIT #1. MU #2. CHK MWD @546. ORIENT TOOL FACE. DRILL T/3594. CBU. DRIL T/3750. SHORT TRIP MW: 0.0 VIS: 0 CIRC BOTTOMS UP, OBSERVE WELL TO POH. POH FOR NEW MUD MOTOR TO INCREASE BUILD RATE. MU BIT #3 ADJUST BENT HOUSING ON MUD MOTOR AND ORIENT. RIH CHECK SHOT MWD @ 546' PU 30 JTS DP F/ SHED AND RIH TO 3750' NO FILL. DRLG F. 3%50 - 4902' CIRC BOTTOMS UP. HOLE CLEAN, ROTATE, RECIP PIPE. POH SHORT TRIP 30 STD, COND WELL FOR CSG RUN. ND DIVERTOR MW: 0.0 ViS: 0 POOH T/RUN CASG. RAN 10-3/4" CASG T/4873. CBU. MIX & PUMP 743 SX LEAD; 668 SX TAIL. TEST LINES T/3000. BUMP PLUG -- PLUG HELD. TEST CASING T/2500/30 MIN. TOP OUT W/CLASS G. 150 BBLS. RD CMT HEAD. DRILLING MW: 0.0 VIS: 0 TEST ALL BOPE T/5000. OK. MU BHA #3 & ORIENT. RIH T/4790. DRILL CMT T/4902. CBU. DRILL 10' OF NEW HOLE, SPOT FLOW VIS PILL F/LEAK OFF TEST. TEST T/EMW OF 10.42. DRILL T/5200. DRILLING MW: 0.0 VIS: 0 DRILLED T/5912. CBU. POOH T/PERFORM LOT/ 625 PSI EMW = 12.2. RIH T/5912. DRILLED T/6632. PERFORMED ROLL TEST T/CONFIRM MWD ACCURACY -- BECAUSE OF MAGNETIC STORM. DRILLED 6728. 1996 WELL : SDI 4-32 OPERATION: RIG : DOYON 15 PAGE: 2 06/20/95 ( 8) TD: 7093' ( 365) 06/21/95 (9) TD: 9113'(2020) 06/22/95 (10) TD: 9714' ( 601) 06/23/95 (11) TD:10700' ( 986) 06/24/95 (12) TD:l1815' (1115) 06/25/95 (13) TD:l1815' ( 0) 06/26/95 (14) TD:12225' ( 410) 06/27/95 (15) TD:12300' ( 75) 06/28/95 (16) TD:13067' ( 767) DRILLING MW: 0.0 VIS: 0 DRIL T/6917. CBU. POOH T/SWAB. DRILL T/7672. CBU. POOH SWAB F/7400 T/6900. CHANGE OUT BHA. SERVICE WEAR RING. RIH T/DRILL W/BIT #5. DRILLING MW: 0.0 VIS: 0 RIH T/6587. TAKE SURVEY. WASH/REAM F/6587 T/7672. DRILL T/8637. CBU. OBSERVE WELL --OK. SHORT TRIP T/7587. DRILL T/9113. TOOH MW: 0.0 VIS: 0 DRILL T/9714. CBU. OBSERVE WELL & POOH. DRILLING MW: 0.0 VIS: 0 MU BHA #6. RIH T/4852. SERVICE THE BLOCK LINE. RIH T/5227. STOP T/TAKE A SURVEY. TIH T/7715. PU 63 JTS OF DP W/NON ROTATING PIPE RUBBERS. WASH T/9714. DRILL T/10700. POOH T/6000 MW: 0.0 VIS: 0 DRILL T/10767. POOH T/9718. PU 30 JTS OF DP W/NON ROTATING PIPE RUBBERS. DRILL T/11815. CBU. SWEEP HOLE W/SLUG. 100% HOLE VOL. POOH T/6000. RIH W/DP MW: 0.0 VIS: 0 POOH T/1036. LAID OUT BUMPER SUB. PULL WEAR BUSHING INSTALL TEST PLUG. CHANGE OUT KELLY VALVES ON TOP DRIVE. TEST ALL RAMS T/5000. RIH W/DP. DRILLING MW: 0.0 VIS: 0 RIH T/11685. REAM T. 11815. DRILL T/12225. DRILLING MW: 0.0 VIS: 0 DRILL T/12269. HAD A BI FAILURE. CBU. OBTAINED 100% HOLE VOL. POOH T/1000. OBSERVE THE WELL. CHANGE BITS & ORIENT THE MWD. RIH T/4872. BENCHMARK SURVEY & OBSERVE THE WELL. RIH T/5203. TOOK MWD SURVEY. RIH T/10550. CHANGED SWIVEL PACKING. RIH T/11414. REAM T/12269. DRILL T/12300. CIRCULATING MW: 0.0 VIS: 0 DRILL T/13067. TRQ CHANGE T/25000 FT. LB. STALLED TOP DRIVE. CIRC W/SLUG. 100% HOLE VOL. WELL : SDI 4-32 OPERATION: RIG : DOYON 15 PAGE: 3 06/29/95 (17) TD:13150' ( 83) 06/30/95 (18) TD:13300' ( 150) 07/01/95 (19) TD:13300' ( 0) 07/02/95 (20) TD:13300' ( 0) 07/03/95 (21) TD:13300' ( 0) 07/04/95 (22) TD:13300' ( 0) 07/05/95 (23) TD:13300 PB:10390 DRILLING MW: 0.0 VIS: 0 POOH T/1013. MU BHA #9. RIH T/3800. STOP T/SERVICE TOP DRIVE. RIH T/12209. REAM T/13067. DRILL T/13150. RIGGING UP ATLAS WIRELINE MW: 0.0 VIS: 0 DRILLED TO 13300' BIT QUIT. CIRCULATED @ 13300' OBTAINED BOTTOMS UP. OBSERVED WELL AND PUMPED SLUG. POH TO 11250'_ 20 STAND SHORT TRIP. HAD SEVERAL TIGHT SPOTS, WORKED THROUGH. RIH TO 13300'. CIRCULATED. PUMPED HI/LOW SWEEPS. OBSERVE WELL AND PUMP SLUG. OBTAINED BOTTOMS UP. POH TO 935'. HOLE IN GOOD CONDITION. PULLED BHA. RIGGING UP ATLAS WIRELINE. RIH T/12388 MW: 0.0 VIS: 0 RUN SURVEY. LOGS F/13289 T/11719. MU BHA #10. RIH T/4873. SERVICE THE DRAWWORKS-SLIP & CUT LINE 60'. RIH T/8568. FILL PIPE & BREAK CIRC. RIH T/12388. FILL PIPE & BREAK CIRC. RIH T/3000 MW: 0.0 VIS: 0 RIH T/13125. FILL PIPE & BREAK CIRC. WASH & REAM T/13300. PUMP LO/HI SWEEP. OBTAINED 200% HOLE VOL. LD DP T/12365. RU T/RUN 7-5/8" CASG. RIH T/3000. CBU MW: 0.0 VIS: 0 RAN CASG T/10455. PIPE GOT STUCK. CIRC UP T/15 BPM WHILE WORKING T/FREE PIPE. DISPLACE HOLE W/WBM 100%. SPOT 100 BBLS SFT. 80 BBLS OUTSIDE CASG & 20 BBLS INSIDE. CBU. WORK PIPE WHILE PUMPING 1/2 BBLS EVERY 30 MIN. RU CMT SYSTEM MW: 0.0 VIS: 0 CBU. MU XO T/DRILL PIPE & TOP DRIVE. CBU. WORK PIPE UNTIL FREE. TRY T/RUN CASG--HOLE IS TIGHT. CBU @ 13020. RAN CASG T/13284. LOST APPROX 600 BBLS OF MUD. RU T/CMT CASG. WAIT ON CMT MW: 0.0 TEST LINES T/4000. MIX & PUMP 450 SX OF CMT @' 15.8 PPG. TAILED IN THE LAST 35 BBLS @ 16.5 PPG. DISPLACED SLURRY @ 14 BBL/MIN. BUMPED PLUG W/3500 PSI. FLTS HELD. INSTALL SEAL ASSY TEST T/5000/15 MIN. INJECT 200 BBLS OF MUD DOWN ANNUL LD CASG TOOLS. RU SHOOTING FLANGE ON BOPS. TEST STACK T/5000. TEST ANNUL PREVENTER T/3500. SLIP & CUT DL. WAIT ON CMT T/RUN BOND LOG. WELL : SDI 4-32 OPERATION: RIG : DOYON 15 PAGE: 4 07/06/95 (24) TD:13300 PB:10390 07/07/95 (25) TD:13300 PB:10390 07/08/95 (26) TD:13300 PB:10390 07/09/95 (27) TD:13300 PB:10390 07/10/95 (28) TD:13300 PB:10390 07/11/95 (29) TD:13300 PB:10390 RIH T/5750 MW: 0.0 RU WL & LUBRICATOR. RAN CMT BOND LOG F/13172 T/12050. CHANGE TOP RAMS T/3.5" TEST RAMS & BONNET SEALS & RU FLOWLINE NIPPLE. MU BHA #11 & RIH T/5750. PERFORATING MW: 0 . 0 RIH T/10000. REPAIR SKATE. TIH T/13199. TAG FLT COLLAR. CBU. RAISE BRINE WT T/9.0 PPG. OBTAINED 100% HOLE VOL. POOH T/925. ND BELL NIPPLE & RU SHOOTING FLANGE, PRESS TEST LUB T/10000PSI. RIH & SHOOT 4 SHOTS F/12882 T/12886. RIH W/WL & SET CMT RETAINER @12875. RIH & FIRE 4 SHOTS F/12862 T/12866. MU BHA #11 MW: 0.0 RD SHOOTING NIPPLE & RU BELL NIPPLE. REPAIR IRON ROUGHNECK. RIH W/CMT RETAINER SPINNER T/TOP OF PACKER @12875. STUNG INTO RETAINER & CIRC. SQUEEZE PERFS @ 4 BPM @ 2600PSI. PULLED OUT OF RETAINER & CBU. OBTAINED 100% ANNUL. VOL. SPOT CMT SLURRY & STUNG INTO RETAINER PUMP @ 3 BPM. INITIAL PRESS @ 875 PSI. FINAL PRESS @1700PSI. PULLED OUT OF RETAINER. LEFT 5 BBLS BALANCE PLUG ON RETAINER. REV. CIRC 2 DP VOL. OBTAINED 200% HOLE VOL. WOC MONITOR WELL. PULL DP T/SURF. MU BHA ~11. LD 3.5" DP MW: 0.0 RIH T/11490 & PERFORM IT WW3500. WASH T/12412. TAG CMT. DRILL T/12875. PUMP HI VIS SLURRY. PERFORM IT T/1500. MILLED CMT RETAINER @ 12875. RIH T/13201. PUMP HI VIS SWEEP OBTAINED 100% HOLE VOL. PERFORM IT TEST T/1500. CBU. DISPLACE THE HOLE W/CLEAN 9 PPG BRINE. POOH T/ll000. LD 3.5" DP. RUN COMPLETION MW: 0.0 POOH T/935. LD 3.5" DP. TEST WELL CONTROL EQUIP. T/500/5000. RAN 12.6# 13CR NSCT TBG T/1000. STOP T/FIX EQUIP. FAILURE. CONTINUE T/RUN TBG T/8650. FREEZE PROTECT WELL MW: 0.0 RAN TBG T/10850. TEST CL VIA ANNUL. TEST T/5000. LAND HNGR ND SFTY BOSS FLNAGE & FLOWLINE. NU TREE T/5000 & TEST. REV CIRC. DISPLACE ANNUL W/BRINE TREATED W/COREXIT INHIBITOR. RAN 4.5" COMPLETION T/12351. CBU. FREEZE PROTECT TBG & ANNUL. W/DIESEL. WELL : SDI 4-32 OPERATION: RIG : DOYON 15 PAGE: 5 07/12/95 (30) TD:13300 PB:10390 07/13/95 (31) TD:13300 PB:10390 RIG RELEASED MW: 0.0 SET BPV IN TREE & RELEASE THE RIG @ 0700 HRS ON 7/11/95. RIG MAINTENANCE MW: 0.0 GENERAL RIG MAINTENANCE & REPAIR 07/14/95 (32) TD:13300 PB:10390 07/15/95 (33) TD:13300 PB:10390 RIG MAINTENANCE MW: 0.0 PAINT DERRICK WIND WALLS AND UNDER RIG FLOOR. TUBOSCOPE MUD PUMP LINES AND STAND PIPE. INSTALL AIR DUCT IN TURBINE ROOM FOR SCR. INSTALL AIR/WATER SEPERATOR IN AIR SYSTEM. CLEAN WHEEL WELLS FOR PAINTING. REPAIR CENTRIFUGE AND MUD PIT EQUIPMENT. DROP DOWN TOP DRIVE PIPE HANDLER FOR INSPECTION. CHANGE OPUT DIES IN ROUGHNECK FOR 5". CHANGE OUT VALVES ON BOILER. INSPECT ROLLERS ON BLOCK DOLLY. CLEANING AND PAINTING. RIG MAINTENANCE MW: 0.0 GENERAL RIG MAINTENANCE & REPAIR 07/16/95 (34) TD:13300 PB:10390 RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR MW: 0.0 07/17/95 (35) TD:13300 PB:10390 RIG MAINTENANCE GENERAL RIG MAINTENANCE & REPAIR. MW: 0.0 07/18/95 (36) TD:13300 PB:10390 07/19/95 (37) TD:13300 PB:10390 RIG MAINTENANCE MW: 0.0 SERVICED DRILLFLOOR/DERRICK. PAINT DERRICK WIND WALLS AND RIG FLOOR. PAINT PUMP ROOM AND CELLAR. SERVICED ALL TRACTION MOTORS. PAINT MUD PITS AND CELLAR. RE-ASSEMBLE BOPE. RIG UP DRILLFLOOR. RIG MAINTENANCE MW: 0.0 FINISHED UP PLANNED ANNUAL RIG MAINTENANCE. 07/20/95 (38) TD: 3611'( o) DRILLING MW: 0.0 VIS: 0 DRILL T/3327. CBU OBTAINED 100% ANNUL. VOL. DRILL T/3611. WELL : OPERATION: RIG : SDI 4-32 PAGE: SIGNATURE: (drilling superintendent) DATE: Gas Cons. ,~-~ gri,'..}, ,..,,~,,.,- Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 July 26, 1995 Ms. Terrie Hubble B.P. Exploration Pmdhoe Bay Drilling Department 900 E. Benson Blvd. Anchorage, AK 99508 MB 12-1 Re: SDI Unit #4-32/K-38 Atlas Mast Truck, Endicott Field Dear Ms. Hubble, Enclosed please find one (1) original and three copies (3) of the completed survey of Well #4-32/K-38 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely Operations Manager RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data SDi UNIT, WELL NO. 4-32/K-38 Gy I~ in 4. tubing Survey date · 16 July, 1995 Job number · AK0795G280 Date.~-L~ -- SR280.DOC gyro/data CONTENTS JOB NUMBER :AK0795G280 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR280. DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR280.DOC gyro/data DISCUSSION JOB NUMBER' AK0795G280 Tool 080 was run in 4-32/K-38 on ATLAS 5/16" Wireline inside 4.5" tubing. The survey was run without problems. SR280.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER' AK0795G280 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS ENGINEER SR280.DOC gyro/data 2. SURVEY DETAILS SR280.DOC gyro/data SURVEY DETAILS JOB NUMBER' AK0795G280 CLIENT ' B.P. EXPLORATION RIG · ATLAS LOCATION · SDI UNIT WELL · 4-32/K-38 LATITUDE · 70.342 N LONGITUDE: 148.5 W S U RVEY DATE · 16-July, 1995 SURVEY TYPE · MULTISHOT IN 4.5" tubing DEPTH REFERENCE' MAX. SURVEY DEPTH · ROTARY TABLE EVELATION 56.0 asl, 15.4' G.L. 13100 SURVEY TIED ONTO · N/A SURVEYINTERVAL' 100' UTM CO-ORDINATES · TARGET DIRECTION · 63.00 GRID CORRECTION · CALCULATION METHOD' MINIMUM CURVATURE SURVEYOR · STODDARD SR280.DOC gyro/data 3. OUTRUN SURVEY LISTING SR280. DOC A Gyro da t a D i r e c t i on a i Survey for B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location- MAST TRUCK, ENDICOTT FIELD, ALASKA Job Number: AK0795G280 Run Date: 16-Jul-95 08:08:00 Surveyor- TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342000 deg. N Sub-sea Correction from Vertical Reference: 56 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 63.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro d a t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -56.0 0.00 0.0 0.0 0 - 13100 FT. GYRO SURVEY RUN IN 4 1/2" TUBING. MEASURED DEPTHS ARE REFERENCED TO AN R.K.B. HEIGHT OF 56 FT. ABOVE SEA LEVEL. Page HORIZONTAL COORDINATES feet 0.00 N 0.00 E 100.0 .22 306.63 100.0 -.1 44.0 .22 .2 306.6 200.0 .09 308.93 200.0 -.2 144.0 .13 .5 307.0 300.0 .16 224.75 300.0 -.4 244.0 .17 .6 293.5 400.0 1.11 198.36 400.0 -1.2 344.0 .97 1.2 229.5 500.0 2.60 171.73 499.9 -2.6 443.9 1.69 4.1 192.8 600.0 3.66 174.51 599.8 -4.5 543.8 1.06 9.4 181.7 700.0 4.42 175.24 699.5 -7.1 643.5 .76 16.4 178.8 800.0 5.09 176.44 799.2 -10.3 743.2 .69 24.7 177.8 900.0 5.08 176.58 898.8 -13.9 842.8 .02 33.5 177.5 1000.0 5.42 176.60 998.4 -17.5 942.4 .35 42.7 177.3 1100.0 5.48 176.01 1097.9 -21.3 1041.9 .08 52.2 177.1 1200.0 5.40 175.08 1197.5 -24.9 1141.5 .12 61.7 176.9 1300.0 4.79 174.29 1297.1 -28.2 1241.1 .62 70.5 176.6 1400.0 4.34 172.68 1396.8 -31.0 1340.8 .47 78.5 176.3 1500.0 3.85 168.20 1496.5 -33.2 1440.5 .59 85.6 175.8 1600.0 2.73 158.79 1596.3 -34.3 1540.3 1.24 91.2 175.1 1700.0 1.45 142.05 1696.3 -34.3 1640.3 1.40 94.5 174.3 1800.0 1.38 123.05 1796.2 -33.4 1740.2 .47 96.4 173.3 1900.0 2.26 104.16 1896.2 -31.4 1840.2 1.06 97.9 171.7 2000.0 4.54 87.66 1996.0 -26.3 1940.0 2.45 99.2 168.4 .11 N .15 W .28 N .37 W .23 N .52 W .79 S .92 W 3.96 S .90 W 9.38 S .27 W 16.39 S .35 E 24.66 S .95 E 33.51 S 1.49 E 42.64 S 2.03 E 52.12 S 2.65 61.57 S 3.38 E 70.42 S 4.20 E 78.32 S 5.10 E 85.36 S 6.27 E 90.86 S 7.81 E 94.07 S 9.45 E 95.72 S 11.23 E 96.86 S 14.15 E 97.18 S 20.03 E A Gyro da t a D i r e c t i on a i Survey B.P. EXPLORATION WELL: SDI UNIT ~4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 6.47 75.87 2095.6 2200.0 8.61 71.88 2194.7 2300.0 10.74 69.86 2293.3 2400.0 13.31 68.89 2391.1 2500.0 15.60 67.96 2487.9 -17 -4 12 33 57 .2 .3 .4 .1 .9 2039.6 2.23 100.1 162.9 2138.7 2.20 101.1 155.4 2237.3 2.15 104.0 146.2 2335.1 2.58 110.6 135.6 2431.9 2.31 122.5 124.8 95.64 S 29.44 91.94 S 42.02 86.40 S 57.89 79.05 S 77.38 69.85 S 100.58 2600.0 17.82 66.96 2583.7 2700.0 20.28 65.19 2678.2 2800.0 21.84 62.85 2771.5 2900.0 22.33 60.39 2864.2 3000.0 23.43 58.08 2956.3 86 119 155 192 231 .6 .2 .1 .7 .4 2527.7 2.23 140.1 114.8 2622.2 2.53 163.4 106.2 2715.5 1.77 191.6 98.9 2808.2 1.05 222.6 93.1 2900.3 1.42 255.8 88.2 58.82 S 127.13 E 45.56 S 156.95 E 29.79 S 189.24 E 11.92 S 222.30 E 7.98 N 255.69 E 3100.0 24.35 56.58 3047.7 3200.0 25.06 55.91 3138.6 3300.0 27.12 55.91 3228.4 3400.0 29.73 56.22 3316.3 3500.0 31.97 56.80 3402.1 271 313 356 404 455 .7 .2 .9 .1 .1 2991.7 1.10 291.3 84.1 3082.6 .76 328.8 80.7 3172.4 2.06 369.2 77.8 3260.3 2.62 413.8 75.4 3346.1 2.26 462.6 73.3 29.85 N 289.78 E 53.07 N 324.52 E 77.72 N 360.95 E 104.29 N 400.44 E 132.58 N 443.21 E 3600.0 33.14 57.15 3486.4 3700.0 34.31 57.60 3569.6 3800.0 38.23 57.75 3650.2 3900.0 41.56 57.52 3726.9 4000.0 43.66 56.87 3800.5 5O8 563 622 686 754 .6 .9 .8 .6 .0 3430.4 1.19 514.5 71.7 3513.6 1.20 568.5 70.3 3594.2 3.92 626.3 69.1 3670.9 3.33 689.3 68.0 3744.5 2.14 755.9 67.1 161.91 N 488.34 191.84 N 535.10 E 223.47 N 585.09 E 257.80 N 639.26 E 294.49 N 696.16 E 4100.0 46.23 55.94 3871.3 4200.0 48.85 54.89 3938.8 4300.0 50.21 54.02 4003.7 4400.0 51.71 53.11 4066.7 4500.0 52.71 52.37 4127.9 824.1 897.3 972.5 1049.1 1126.9 3815.3 2.65 825.4 66.2 3882.8 2.73 898.0 65.3 3947.7 1.51 972.8 64.4 4010.7 1.66 1049.2 63.6 4071.9 1.16 1126.9 62.9 333.59 N 754.99 E 375.47 N 815.71 E 419.69 N 877.60 E 465.83 N 940.08 E 513.68 N 1002.98 E A Gyro da t a D i r e c t i o n a i Survey B.P. EXPLORATION WELL: SDI UNIT ~4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 4600 4700 4800 4900 5000 .0 .0 .0 .0 .0 5100.0 5200.0 5300.0 5400.0 5500.0 52.35 51.97 4188.8 52.55 51.65 4249.7 52.20 51.12 4310.8 51.54 50.86 4372.5 50.80 50.47 4435.2 50.02 49.39 4498.9 50.18 47.88 4563.1 51.17 46.40 4626.5 51.99 44.95 4688.6 52.19 44.00 4750.1 5600.0 51.65 5700.0 52.38 5800.0 52.19 5900.0 52.27 6000.0 52.80 6100.0 52.80 6200.0 53.00 6300.0 52.11 6400.0 51.87 6500.0 52.75 6600.0 51.92 6700.0 52.12 6800.0 52.31 6900.0 52.45 7000.0 52.42 1204.8 1282.6 1360.2 1437.1 1513.2 1588.3 1662.6 1737.0 1811.8 1886.6 SUBSEA DEPTH feet 4132.8 4193.7 4254.8 4316.5 4379.2 4442.9 4507.1 4570.5 4632.6 4694.1 43.73 4811.7 1961.0 4755.7 44.11 4873.3 2035.4 4817.3 44.76 4934.4 2110.4 4878.4 45.81 4995.7 2185.7 4939.7 46.72 5056.5 2261.7 5000.5 47.72 5117.0 2338.4 5061.0 48.39 5177.3 2415.4 5121.3 49.04 5238.1 2492.4 5182.1 49.19 5299.7 2568.9 5243.7 49.33 5360.8 2645.7 5304.8 49.23 5421.9 2722.6 5365.9 49.41 5483.5 2799.2 5427.5 49.51 5544.7 2876.1 5488.7 49.88 5605.8 2953.1 5549.8 50.15 5666.7 3030.4 5610.7 DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. .48 1204.9 62.2 .32 1283.0 61.5 .54 1361.0 61.0 .70 1438.6 60.4 .80 1515.4 59.9 1.14 1591.4 59.4 1.17 1666.8 58.9 1.51 1742.6 58.4 1.40 1819.1 57.9 .78 1895.9 57.3 .57 1972.5 56.8 .78 2049.4 56.3 · 54 2126.9 55 · 9 .84 2204.7 55.5 .89 2283 .0 55.2 · 80 2362.0 54.9 .57 2441.2 54.7 1.03 2520.1 54.5 .26 2598.6 54.3 .88 2677.4 54.2 .83 2756.3 54.0 .24 2834.9 53.9 .21 2913.7 53.8 .33 2992.7 53.7 .22 3071.8 53.6 Page 3 HORIZONTAL COORDINATES feet 562.36 N 1065.67 E 611.37 N 1127.98 660.80 N 1189.87 710.31 N 1251.00 E 759.68 N 1311.25 E 809.28 N 1370.22 E 859.98 N 1427.79 E 912.60 N 1484.48 E 967.34 N 1540.52 E 1023.64 N 1595.79 E 1080.40 N 1137.17 N 1193.65 N 1249.27 N 1304.13 N 1358.23 N 1411.54 N 1463.92 N 1515.49 N 1567.14 N 1618.78 N 1670.16 N 1721.53 N 1772.77 N 1823.71 N 1650.34 E 1705.01 E 1760.40 E 1816.56 E 1873.91 E 1932.37 1991.69 E 2051.35 E 2110.92 E 2170.88 E 2230.88 E 2290.65 E 2350.71 E 2411.12 E 2471.85 E A Gyro da t a D i r e c t i o n a I Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. H O R I Z O N T A L COORDINATES feet 7100.0 52.17 50.43 5727.9 7200.0 52.10 50.41 5789.3 7300.0 51.95 50.38 5850.8 7400.0 51.73 50.22 5912.6 7500.0 51.69 49.88 5974.6 3107.6 3184.6 '3261.5 3338.3 3414.7 5671.9 5733.3 5794.8 5856.6 5918.6 .34 3150.8 53.5 .07 3229.6 53.4 .15 3308.4 53.4 .25 3386.9 53.3 .27 3465.2 53.2 1874.26 N 2532.72 E 1924.56 N 2593.57 1974.81 N 2654.30 m 2025.04 N 2714.80 E 2075.44 N 2774.97 E 7600.0 50.91 49.58 6037.1 7700.0 50.50 49.30 6100.4 7800.0 50.57 49.22 6164.0 7900.0 51.07 49.11 6227.1 8000.0 51.52 49.28 6289.7 3490 3565 3640 3716 3792 .7 .9 .9 .2 .0 5981.1 6044.4 6108.0 6171.1 6233.7 · 82 3543.1 53.1 .46 3620.4 53.1 .10 3697.4 53.0 · 50 3774.8 52.9 · 48 3852.6 52.8 2125.89 N 2834.52 E 2176.21 N 2893.32 E 2226.60 N 2951.81 E 2277.28 N 3010.46 E 2328.28 N 3069.53 E 8100.0 52.12 49.54 6351.5 8200.0 52.70 49.89 6412.5 8300.0 53.26 50.06 6472.7 8400.0 53.66 50.30 6532.2 8500.0 52.73 50.55 6592.1 3868.4 3945.5 4023.3 4101.6 4179.8 6295.5 6356.5 6416.7 6476.2 6536.1 .63 3931.1 52.8 .64 4010.2 52.7 .58 4090.0 52.6 .44 4170.3 52.6 .95 4250.3 52.5 2379.42 N 2430.65 N 2482.00 N 2533.46 N 2584.47 N 3129.23 E 3189.67 E 3250.81 E 3312.52 E 3374.23 E 8600.0 53.14 50.91 6652.4 8700.0 53.96 51.56 6711.8 8800.0 53.40 52.20 6771.1 8900.0 52.23 52.83 6831.5 9000.0 51.38 53.36 6893.3 4257 4336 4415 4493 4571 .8 .5 .6 .9 .3 6596.4 6655.8 6715.1 6775.5 6837.3 .49 4330.0 52.5 .97 4410.4 52.5 .76 4491.0 52.5 1.26 4570.7 52.5 .95 4649.3 52.5 2634.98 N 2685.34 N 2735.07 N 2783.56 N 2830.75 N 3436.00 3498.72 E 3562.10 E 3625.32 E 3688.16 E 9100.0 49.43 53.96 6957.1 9200.0 47.12 54.72 7023.6 9300.0 43.74 55.97 7093.8 9400.0 41.32 57.68 7167.5 9500.0 38.45 59.86 7244.2 4647.3 4721.1 4791.7 4858.9 4922.8 6901.1 6967.6 7037.8 7111.5 7188.2 2.00 4726.3 52.5 2.38 4800.9 52.5 3.49 4872.0 52.6 2.68 4939.4 52.6 3.19 5003.2 52.7 2876.41 N 2919.93 N 2960.44 N 2997.45 N 3030.72 N 3750.22 E 3810.85 E 3869.43 E 3925.99 E 3980.80 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 9600.0 9700.0 9800.0 9900.0 10000.0 36.34 61.76 7323.6 35.20 63.14 7404.8 35.36 63.99 7486.4 35.38 63.81 7568.0 35.69 63.16 7649.3 4983.5 5041.9 5099.7 5157.6 5215.7 7267.6 7348.8 7430.4 7512.0 7593.3 2.41 5063.3 52.8 1.40 5121.0 52.9 .52 5177.7 53.0 .11 5234.6 53.2 .49 5291.8 53.3 3060.36 N 3087.40 N 3113.11 N 3138.57 N 3164.52 N 4033.79 E 4085.60 4137.32 m 4189.30 E 4241.31 E 10100.0 10200.0 10300.0 10400.0 1O500.0 35.71 62.49 7730.6 35.69 61.85 7811.8 35.79 61.27 7892.9 35.92 61.15 7974.0 36.03 '61.06 8054.9 5274.0 5332.4 5390.8 5449.3 55O8.O 7674.6 7755.8 7836.9 7918.0 7998.9 .39 5349.3 53.4 .37 5407.0 53.5 .35 5464.8 53.6 · 15 5522.9 53.6 .13 5581.1 53.7 3191.17 N 3218.41 N 3246.22 N 3274.43 N 3302.81 N 4293.22 E 4344.82 E 4396.18 E 4447.51 E 4498.94 E 10600.0 10700.0 10800.0 10900.0 11000.0 35.91 60.97 8135.9 36.03 60.88 8216.8 35.89 60.75 8297.7 35.91 60.73 8378.7 35.58 60.63 8459.9 5566.7 5625.4 5684.1 5742.7 5801.0 8079.9 8160.8 8241.7 8322.7 8403.9 · 13 5639.4 53.8 .13 5697.7 53.9 · 16 5756.0 53.9 .03 5814.2 54.0 · 34 5872.2 54.1 3331.27 N 3359.81 N 3388.44 N 3417.09 N 3445.70 N 4550.31 E 4601.64 E 4652.91 E 4704.06 E 4754.99 E 11100.0 11200.0 11300.0 11400.0 11500.0 34.90 60.54 8541.6 34.63 60.38 8623.7 34.40 60.33 8706.1 34.13 60.16 8788.8 33.82 60.05 8871.7 5858.7 5915.7 5972.3 6028.5 6084.3 8485.6 8567.7 8650.1 8732.8 8815.7 .68 5929.5 54.1 .28 5986.2 54.2 .23 6042.6 54.3 .28 6098.6 54.3 .32 6154.2 54.4 3474.04 N 3502.15 N 3530.18 N 3558.12 N 3585.97 N 4805.26 4854.87 E 4904.12 E 4953.00 E 5001.45 E 11600.0 11700.0 11800.0 11900.0 12000.0 33.58 59.91 8954.9 33.16 60.06 9038.4 33.12 60.23 9122.1 33.15 60.90 9205.9 32.43 61.76 9289.9 6139.7 6194.6 6249.2 6303.9 6358.0 8898.9 8982.4 9066.1 9149.9 9233.9 .25 6209.4 54.4 .43 6264.1 54.5 .10 6318.5 54.5 .36 6372.9 54.6 .86 6426.7 54.6 3613.73 N 3641.24 N 3668.46 N 3695.32 N 3721.31 N 5049.48 E 5097.10 E 5144.52 E 5192.13 E 5239.64 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280 ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. H 0 R I Z 0 N T A L COORDINATES feet 12100.0 31.88 62.86 9374.6 6411.2 9318.6 .80 6479.4 54.7 12200.0 31.99 63.71 9459.5 6464.1 9403.5 .46 6531.7 54.7 12300.0 32.81 64.35 9543.9 6517.7 9487.9 .89 6584.6 54.8 12400.0 32.52 64.69 9628.1 6571.6 9572.1 .35 6637.8 54.9 12500.0 32.17 64.95 9712.6 6625.1 9656.6 .37 6690.5 55.0 3746.04 N 5286.76 E 3769.82 N 5334.01 3793.28 N 5382.19 m 3816.50 N 5430.91 E 3839.26 N 5479.34 E 12600.0 31.74 64.97 9797.4 6678.0 9741.4 .44 6742.7 55.1 12700.0 31.03 63.80 9882.8 6730.1 9826.8 .94 6794.0 55.1 12800.0 30.69 63.52 9968.6 6781.4 9912.6 .37 6844.8 55.2 12900.0 31.77 63.52 10054.1 6833.2 9998.1 1.08 6896.1 55.3 13000.0 33.26 62.97 10138.5 6886.9 10082.5 1.52 6949.3 55.3 3861.66 N 3884.17 N 3906.92 N 3930.04 N 3954.24 N 5527.29 E' 5574.25 E 5620.22 E 5666.62 E 5714.61 E 13100.0, 34.12 64.98 10221.7 6942.4 10165.7 1.41 7004.1 55.4 3978.56 N 5764.45 E Final Station Closure: Distance: 7004.13 ft Az: 55.39 deg. A Gyro d a t a D i r e c t i o na i S u rvey for B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, ALASKA Job Number: AK0795G280SS Run Date: 16-Jul-95 08:08:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.342000 deg. N Sub-sea Correction from Vertical Reference: 56 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 63.000 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280SS ALASKA SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. -56.0 0.00 0.00 0.0 0.0 0.00 0 - 13100 FT. GYRO SURVEY RUN IN 4 1/2" TUBING. MEASURED DEPTHS ARE REFERENCED TO AN R.K.B. HEIGHT OF 56 Page CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 0.0 0.0 0.00 N 0.00 E FT. ABOVE SEA LEVEL. 100.0 .15 307.92 156.0 -.1 .17 200.0 .13 261.79 256.0 -.3 .15 300.0 .69 209.97 356.0 -.8 .62 400.0 1.95 183.44 456.0 -2.0 1.37 500.0 3.19 173.29 556.0 -3.7 1.34 600.0 4.08 174.92 656.0 -6.0 .89 700.0 4.80 175.92 756.0 -9.0 .72 800.0 5.08 176.52 856.0 -12.4 .31 900.0 5.27 176.59 956.0 -16.0 .21 1000.0 5.46 176.26 1056.0 -19.7 .19 1100.0 5.44 175.47 1156.0 -23.4 .10 1200.0 5.04 174.61 1256.0 -26.9 .41 1300.0 4.52 173.34 1356.0 -29.9 .53 1400.0 4.05 170.02 1456.0 -32.3 .54 1500.0 3.18 162.59 1556.0 -33.8 .98 1600.0 1.96 148.79 1656.0 -34.3 1.34 1700.0 1.40 130.70 1756.0 -33.8 .85 1800.0' 1.91 111.75 1856.0 -32.2 .82 1900.0 3.63 94.27 1956.0 -28.3 1.90 2000.0 5.70 80.56 2056.0 -20.8 2.32 .5 306.8 .6 299.5 1.2 257.6 4.1 208.9 9.4 186.6 16.4 180.0 24.7 178.2 33.5 177.6 42.7 177.3 52.2 177.2 61.7 177.0 70.5 176.7 78.5 176.4 85.6 176.0 91.2 175.4 94.5 174.6 96.4 173.7 97.9 172.3 99.2 169.7 100.1 165.1 .20 N .27 W .25 N .45 W .54 S .75 W 2.57 S .91 W 7.00 S .55 W 13.33 S .32 E 21.07 S .69 E 29.70 S 1.26 E 38.75 S 1.80 E 48.12 S 2.39 E 57.63 S 3.08 E 66.77 S 3.86 E 75.09 S 4.73 E 82.50 S 5.79 E 88.64 S 7.19 E 92.78 S 8.79 E 95.06 S 10.51 E 96.40 S 12.98 E 97.05 S 17.67 E 96.25 S 25.70 E A Gy r o d a t a D i r e c t i o n a i S u rv e y B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 2100.0 7.78 73.44 2156.0 2200.0 9.93 70.62 2256.0 2300.0 12.39 69.24 2356.0 2400.0 14.85 68.27 2456.0 2500.0 17.18 67.25 2556.0 -9.3 6.1 25.6 49.7 78.3 2.21 2.17 2.43 2.40 2.26 101.1 158.3 104.0 149.7 110.6 139.4 122.5 128.3 140.1 117.7 93.38 S 37.12 E 88.49 S 51.89 E 81.68 S 70.39 E 72.88 S 92.94 E 62.00 S 119.47 E 2600.0 19.70 65.60 2656.0 2700.0 21.58 63.24 2756.0 2800.0 22.28 60.60 2856.0 2900.0 23.43 58.09 2956.0 3000.0 24.41 56.52 3056.0 111.5 149.1 189.4 231.3 275.5 2.46 1.90 1.11 1.42 1.07 163.4 108.2 191.6 100.1 222.6 93.6 255.8 88.2 328.8 83.8 48.67 S 149.95 E 32.41 S 183.88 E 13.49 S 219.39 E 7.99 N 255.59 E 31.97 N 292.94 E 3100.0 25.46 55.91 3156.0 3200.0 27.94 56.01 3256.0 3300.0 30.77 56.49 3356.0 3400.0 32.72 57.03 3456.0 3500.0 34.12 57.53 3556.0 321.7 371.7 427.7 489.3 554.8 1.02 2.23 2.45 1.57 1.19 369.2 80.2 413.8 77.1 462.6 74.5 514.5 72.3 568.5 70.5 57.86 N 331.59 E 86.07 N 373.36 E 117.38 N 420.22 E 151.32 N 472.05 E 186.95 N 527.46 E 3600.0 38.49 57.74 3656.0 3700.0 42.39 57.26 3756.0 3800.0 45.68 56.14 3856.0 3900.0 49.21 54.66 3956.0 4000.0 51.46 53.26 4056.0 627.6 713 .3 809.0 917.2 1036.1 3.88 2.86 2.54 2.41 1.64 689.3 69.0 755.9 67.7 825.4 66.4 972.8 65.1 1049.2 63.8 226.06 N 589.19 E 272.31 N 661.75 E 325.15 N 742.29 E 387.21 N 832.14 E 458.02 N 929.51 E 4100.0 52.55 52.19 4156.0 4200.0 52.51 51.60 4256.0 4300.0 51.71 50.93 4356.0 4400.0 50.54 50.11 4456.0 4500.0 50.16 48.05 4556.0 1162.8 1290.6 1416.6 1537.7 1654.4 .85 .34 .66 .91 1.17 1204.9 62.6 1361.0 61.5 1438.6 60.6 1591.4 59.8 1666.8 59.0 536.14 N 616.47 N 697.08 N 775.86 N 854.38 N 1031.90 E 1134.36 E 1234.66 E 1330.49 E 1421.42 E A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 51.56 45.71 4656.0 1772.5 4700.0 52.14 43.97 4756.0 1893.8 4800.0 52.18 44.01 4856.0 2014.5 4900.0 52.22 45.13 4956.0 2136.9 5000.0 52.79 46.71 5056.0 2261.1 1.46 1819.1 58.2 .76 1972.5 57.3 .73 2049.4 56.4 .65 2204.7 55.7 .89 2283.0 55.2 938.62 N 1029.11 N 1121.23 N 1213.22 N 1303.65 N 1511.12 E 1601.05 E 1689.67 E 1780.16 E 1873.41 E 5100.0 52.93 48.15 5156.0 2388.2 5200.0 52.04 49.09 5256.0 2514.6 5300.0 52.68 49.32 5356.0 2639.6 5400.0 52.03 49.33 5456.0 2765.0 5500.0 52.34 49.57 5556.0 2890.3 .65 2441.2 54.8 .81 2598.6 54.4 .83 2677.4 54.2 .50 2834.9 54.0 .23 2992.7 53.8 1392.69 N 1478.90 N 1563.05 N 1647.21 N 1730.98 N 1970.72 E 2068.65 E 2166.13 E 2263.96 E 2361.85 E 5600.0 52.43 50.10 5656.0 3016.8 5700.0 52.14 50.42 5756.0 3142.8 5800.0 51.93 50.37 5856.0 3268.0 5900.0 51.70 49.98 5956.0 3391.8 6000.0 50.79 49.49 6056.0 3513.2 6100.0 50.56 49.23 6156.0 3631.5 6200.0 51.28 49.19 6256.0 3751.2 6300.0 52.16 49.57 6356.0 3874.1 6400.0 53.11 50.01 6456.0 4001.7 6500.0 53.29 50.40 6556.0 4132.6 .24 3071.8 53.6 .22 3229.6 53.5 .16 3386.9 53.3 .27 3465.2 53.2 .71 3620.4 53.1 .14 3697.4 53.0 .49 3852.6 52.9 .63 4010.2 52.7 .60 4090.0 52.7 .64 4250.3 52.6 1814.73 N 1897.28 N 1979.03 N 2060.34 N 2140.93 N 2220.29 N 2300.82 N 2383.22 N 2467.77 N 2553.70 N 2461.15 E 2560.58 E 2659.38 E 2756.95 E 2852.09 E 2944.49 E 3037.73 E 3133.71 E 3233.86 E 3337.00 E 6600.0 53.19 50.94 6656.0 4262.5 6700.0 53.54 52.04 6756.0 4395.4 6800.0 51.89 53.04 6856.0 4524.6 6900.0 49.46 53.95 6956.0 4646.1 7000.0 45.56 55.30 7056.0 4753.7 .52 4410.4 52.5 .82 4491.0 52.5 1.14 4649.3 52.5 1.98 4726.3 52.5 2.89 4872.0 52.6 2638.02 N 2722.43 N 2802.25 N 2875.65 N 2938.62 N 3439.79 E 3545.98 E 3650.21 E 3749.18 E 3837.89 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 7100.0 41.70 57.41 7156.0 7200.0 38.14 60.14 7256.0 7300.0 35.88 62.31 7356.0 7400.0 35.30 63.67 7456.0 7500.0 35.38 63.84 7556.0 4848.4 4931.8 5006.8 5078.2 5149.1 2.81 3.08 2.01 .85 .17 4939.4 52.6 5063.3 52.7 5121.0 52.9 5177.7 53.0 5234.6 53.1 2991.68 N 3035.12 N 3071.14 N 3103.52 N 3134.83 N 3917.18 E 3988.66 E 4054.45 E 4118.04 E 4181.67 E 7600.0 35.69 63.11 7656.0 7700.0 35.70 62.29 7756.0 7800.0 35.74 61.54 7856.0 7900.0 35.89 61.18 7956.0 8000.0 36.03 61.06 8056.0 5220.5 5292.3 5364.2 5436.3 5508.8 .48 .39 .36 .19 .13 5349.3 53.3 5407.0 53.4 5464.8 53.5 5522.9 53.6 5639.4 53.7 3166.70 N 3199.70 N 3233.56 N 3268.16 N 3303.19 N 4245.56 E 4309.38 E 4372.80 E 4436.12 E 4499.62 E 8100.0 35.94 60.95 8156.0 8200.0 35.96 60.82 8256.0 8300.0 35.90 60.74 8356.0 8400.0 35.59 60.64 8456.0 8500.0 34.86 60.51 8556.0 5581.3 5653.8 5726.2 5798.2 5868.7 .13 .15 .06 .32 .61 5697.7 53.8 5756.0 53.9 5814.2 54.0 5872.2 54.1 5986.2 54.1 3338.37 N 3373.68 N 3409.05 N 3444.32 N 3478.97 N 4563.09 E 4626.47 E 4689.70 E 4752.54 E 4813.96 E 8600.0 34.54 60.36 8656.0 8700.0 34.24 60.23 8756.0 8800.0 33.88 60.07 8856.0 8900.0 33.57 59.91 8956.0 9000.0 33.15 60.10 9056.0 5937.8 6006.2 6073.8 6140.4 6206.1 .26 .26 .32 .26 .36 6042 .6 54.2 6098.6 54 .3 6154 .2 54.4 6264.1 54.4 6318.5 54.5 3513.13 N 3547.04 N 3580.70 N 3614.09 N 3646.96 N 4874.16 E 4933.62 E 4992.28 E 5050.11 E 5107.06 E 9100.0 33.14 60.50 9156.0 9200.0 32.72 61.41 9256.0 9300.0 32.00 62.62 9356.0 9400.0 31.98 63.68 9456.0 9500.0 32.77 64.40 9556.0 6271.3 6336.1 6399.5 6461.9 6525.4 .21 .66 .81 .48 .81 6372.9 54.5 6426.7 54.6 6479.4 54.7 6531.7 54.7 6637.8 54.8 3679.32 N 3710.81 N 3740.60 N 3768.85 N 3796.62 N 5163.76 E 5220.45 E 5276.41 E 5332.08 E 5389.19 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT FIELD, Job Number: AK0795G280SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERT I CAL DOGLEG SECTION SEVERITY feet deg. / 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 9600.0 32.41 64.78 9656.0 9700 . 0 31 . 95 64 . 96 9756 . 0 9800.0 31.25 64.17 9856.0 9900.0 30.74 63 . 56 9956.0 10000 . 0 31 . 80 63 . 51 10056 . 0 6589.3 .36 6652.2 .41 6713.7 .78 6773.8 .45 6834.4 1.09 6690.5 54.9 6742.7 55.0 6794.0 55.1 6844.8 55.2 6949.3 55.3 3824.02 N 3850.73 N 3877.11 N 3903.58 N 3930.57 N 5446.91 E 5503.88 E 5559.52 E 5613.45 E 5667.68 E 10100.0 33.44 63.40 10156.0 10165.7 34.12 64.98 10221.7 6898.6 1.50 6942.4 1.41 7004.1 55.3 7004.1 55.4 3959.37 N 3978.56 N 5725.12 E 5764.45 E Final Station Closure: Distance: 7004.13 ft Az: 55.39 deg. gyro/data 4. QUALITY CONTROL SR280.DOC Quality Control Comparisons B.P. EXPLORATION WELL: SDI UNIT #4-32/K-38 Location: MAST TRUCK, ENDICOTT PIELD, ALASKA Job Number : AK0795G280 / AK0795G280 INRUN/OUTRUN Comparison INRUN OUTRUN Depth Inc Inc Delta 1000.0 5°59 5.42 .170 3000.0 23.41 23.43 -.018 4000.0 43.28 43.66 -.376 50'00.0 51o05 50.80 .251 6000.0 52.83 52.80 .034 7000.0 52.21 52.42 -.211 8000.0 51.53 51.52 .010 9000.0 51.48 51.38 .100 10000.0 35.76 35.69 .066 11000.0 35.64 35.58 .067 12000.0 32.56 32.43 .130 13000.0 33.17 33.26 -.093 INRUN Az 176.13 57.53 57.25 50.41 47.26 50.54 50.15 53.59 64.39 60.80 62.55 62.03 For Inclinations Greater than 10 degrees: Average Inclination Difference = -.0034 deg. Average Azimuth Difference = .27754 deg. OUTRUN Az 176.60 58.08 56.87 50.47 46.72 50.15 49.28 53.36 63.16 60.63 61.76 62.97 Delta -.469 -.548 .375 -.051 .538 .389 .866 .237 1.226 .172 .794 -.943 gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0795G280 TOOL NUMBER: 08O MAXIMUM GYRO TEMPERATURE: 90.5c MAXIMUM AMBIENT TEMPERATURE: 99.0 c MAXIMUM INCLINATION: 53.96 AVERAGE AZIMUTH: 55.34 WIRELINE REZERO VALUE: -8.0 REZERO ERROR / K: n/a CALIBRATION USED FOR FIELD SURVEY: 6/23/95 CALIBRATION USED FOR FINAL SURVEY: 6/23/95 PRE JOB MASS BALANCE OFFSET CHECK: POST JOB MASS BALANCE OFFSET CHECK] · CONDITION OF SHOCK WATCHES .06 -.00 .00 USED -0.0 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: ok UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY FINAL SURVEY 13100 34.12 64.98 10221.7 3982.8N 5760.1E 13100 34.12 64.98 10221.7 3978.56N 5764.45E SR280.DOC gyro/data FUNCTION TEST JOB NUMBER: AK0795G280 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 5500 52.19 52.19 52.18 52.19 52.19 AZIMUTH M.D. ft 1 2 3 4 5 5500 44.00 43.98 43.99 44.01 43.95 SR280.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR280.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK0795G280 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARZ TOOL No. 080 GYRO SECTION A0094 DATA SECTION A0025 POWER SECTION A0052 BACKUP TOOL No. 713 GYRO SECTION A00 DATA SECTION A0032 POWER SECTION A0027 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0055 A0079 A0035 A0122 A0085 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 5/16 RUNNING GEAR 2 1/2" System w/3" heat shield and eccentric bar, and 3.6" wear bushings. TOTAL LENGTH OF TOOL: MAXIMUM O.D.: 25.5 feet 3.6 iNCHES TOTAL WEIGHT OF TOOL: 280Lbs SR280.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER' AK0795G280 7/15/95 2330 7/16/95 0715 0745 O945 1120 1335 1430 1530 1600 1810 7/17/95 0800 FINISH 95G279. LEAVE FOR SDI UNIT. ARRIVE LOCATION, MU TOOL,REHEAD TO BIG LINE PU TOOL, ZERO. MU LUBRICATOR RIH. 13100' 7200'. 2900' LD TOOL. RUN GAMA RAY, COLLAR LOCATOR, PROCESS SURVEY. RTN ATLAS. STANDBY FOP, 95G281 SR280.DOC LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 18 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: DESCRIPTION PDK FINAL BL+RF WELL ECC No. Run # 1 5723.05 Run ~ 1 5933.02 Run ~ 1 6452.08 Received by: Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street ~/~ Suite 201 Anchorage, AK 99518 ~~ Date : 91ease sign and return ~ · e roteehnical Data Centex- JP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 99508 Rec e ired by - LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 8 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL 2-08/K-16 MPI . . 3-37/L-35 DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 3-37/L-35 1 PFC/PERF FINAL BL+RF i PLS FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 6175.06 Run # 1 6432.06 Run # 1 6432.07 Run # 1 6452.07 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Anchorage, AK 99518 Or F~ to (907) 563-7803 __ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 10 August 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: WELL /K-3S (SDI) # DESCRIPTION 1 CCL FINAL BL+RF ECC No. Run # 1 6148.03 1 CCL FINAL BL+RF Run # 1 6175.05 · 1 PLS FINAL BL+RF Run ~ 1 6452.06 Please sign and return to: Attn. Rodney D. Paulson ~~s wireiiz~~ RECE/V~D ~ 560-r~'~reet~ AUG 7 199'j  /r FAX to (907) 563- Alaska Oil & Gas Cons. Commission Received by~/~/,/~~ ~~ ' Date: Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 27 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: 2-60/U-13 . "6~ 1 PLS .FINAL-BL+RF 4-32/K-38 (SDI) 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 6132.06 Run # 1 6452.05 Please sign and return to~ Attn. Rodn~ Received bv~/~ _~ ~/~ ~ ~ '~- / ~ . / ~--~ Date- LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 20 July 1995 Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: .WELL (SDI) DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1GR/CCL FINAL BL+RF ECC No. Run # 1 6034.06 Run # 1 6217.15 Run # 1 6351.07 Run # 1 6452.04 Please sign and return to: Attn. Rodney D. Atlas Wir~l/~vices ~ 5600 B~/S4freet ///~nchorage, AK 99518 Received by: ~~~/ / ~ ] ~ff Date: · . JUL 4 Alaska Oil & Gas C~s. ~c~omg~ BP EXPLORMION Memorandum To: Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage Alaska, 99501-3192 Attn. Bob Crandall Date: Wed, Jul 19, 1 From: Robert Laule COMM - _ ~OMM '_RES ENG E¢' _SR ENG _ ~ NRO ~,4 _ 'STAT TECH ;~ _STAT TEC ,FILE ~ Subject: Permit 95-35 The bottom hole location permited for sidetrack 3-49/J-40a (Permit 95-35) was drilled and completed as a new well 4-32/K-38. Please cancel the permit ~5-3~ issued for Sidetrack 3-49/J-40a. ~ RECEIVED ~,~¢'-i,,,2 ~;~ o '-,,,~, LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~/0~1 1-09/J-18 MPI DESCRIPTION PLS FINAL BL+RF 1 PLS FINAL BL+RF ! SBT/GR FINAL BL+RF 1PFC/PERF FINAL BL+RF ECC No. Run # 1 3235.07 Run # 1 5906.05 Run # 1 6452.02 Run # 1 6452.03 Please sign and return to: Attn. Rodn_e.y ~ ~ervices Street ~ ~uite 201 Received LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: BP 4-32/K-38 (SDI) ENDICOTT NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Date: RE: 8 July 1995 Transmittal of Data ECC #: 6452.00 Sent by: PRIORITY MAIL Data: OH-LDWG Please sign and return to: Attn. Rodney D. Paulson ~ Atlas W i r e 1 i n e S_.~~~ ~af~ B st~ 3 ~..--'Anchorage, AK 99518 J-'~r FAX~ (907) 563-7803 Received by:/~/~/~j~ ~Z ~// Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ~ ~ / ECC No. 4-32/K-38 (SDI) 1 DIFL/GR FINAL BL+RF 1ZDL/CN/GR FNL BL+RF 1 SSVD/MWD FINAL BL+RF 1 BH PFILE FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 6452.00 4-32/K-38 (SDI) 1 FMT/GR FINAL BL+RF Run # 1 6452.01 and return to: Attn. Rodney_ . t Please sign D Pau son Or/~to (907)563-7803 ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 18, 1995 Adrian Clark Drilling Engineer Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Duck Island Unit/Endicott 4-32/K-38 BP Exploration (Alaska) Inc. Permit No: 95-69 Sur. Loc. 2600'NSL, 677'WEL, Sec. 8, TllN, R17E, UM Btmhole Loc. 1406'NSL, 5135'WEL, Sec. 3, TllN, R17E, UM Dear Mr. Clark: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field 9-3607. David W. ~ohnston ~ Chairman ~ BY ORDER OF THE COMMISSION dlf/~nclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PI::R iT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill I-IIlb. Type of well. Exploratory r"! Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-11 Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration BKB=56 feet Endicott Field/Endicott Pool 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 47503 4. Location of well at surface 17. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2600' NSL, 677' WEL, SEC. 8, T11N, R17E Duck Island Unit/Endicott At top of productive interval :8. Well number Number 1171'NSL, 197' WEL, SEC. 4, T11N, R17E 4-32/K-38 2S100302630-277 At total depth 9. Approximate spud date Amount 1406' NSL, 5135' WEL, SEC. 3, T11N, R17E 5/27/95 $200,000.00 12. Distance to nearest i13. Distance to nearest well 14. Number of acres in property15. Proposed depth(uDandTVD) property line ADL 312828-1406' feet No close apprOach feet 2560 14522' MD/10196' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 5200 feet Maximum hole angle 64.23~ Maximum surface 3900 psig At total depth (TVD) 10000'/4890 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" Struct. Drive Pipe Surface Drive 13-1/2" 10-3/4" 45.5# NT80 BTC 4360' Surface 4360' 4356' 714 sx PF 'EY440 sx "G"/150 sx PF "E' 9-7/8" 7-5/8" 29.7# NT80S NSCC 14522' Surface 14522' 10196' 439 sx Class "G" 1~. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ConductorRECEIVED Surface IntermediateJVJJ Y 1 1 1995 Production Liner bJ~k,~ 0il & Gas Cons. Commission Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth/plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoino//iS, true and cor~rect to the best of my knowledge Signed ..,-'"~,/~ _,.,Z_~_~~,\tL_y,,,~,,,,j.~( Title Drilling Engineer Supervisor Date j'":-:×(_:.-~. .¢- l Cor~mission Use Only Permit Number IAPI number Approval c)~te/ See cover letter 15°-°¢-?- I ..~*'--///'~//~%-- for other requirements Conditions of approval Samples required [] Yes ]~ No Mud Icg re~luire~l []Yes [] No Hydrogen sulfide measures ~ Yes [] No Directional survey required '~ Yes [] No Required working pressure for BOPE 1-12M' 1-13M; ,J~.5M; I-'-I10M; 1-115M; Other: Original Signed By by order of Approved by David W. Johnston Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit ~licate I Well Name: 14-32/K-38 Well Plan Sutnmary ! Type of Well (producer or injector): I Producer Surface Location: 2600 FSL 677 FEL S08 T11N R17E UM Target Location: 1171 FSL 197 FEL S04 T11N R17E UM Bottom Hole Location: 1406 FSL 5135 FEL S03 T11N R 17E UM [AFE Number: [717496 [ Estimated Start Date: ] 5-27-95 [ [Rig: ]DOYON 15 [ Operating days to complete: [MD: [ 14522 [ I TVD: [10196 [ [28 [KBE: 156 Well Design (conventional, slimhole, etc.): [ SLIMHOLE Formation Markers: ,,, Formation Tops MD TVD (BKB) UPPER SV SHALE 3285 3281 SV-5 4260 4256 TUFFS 12073 9331 HRZ 13395 9706 PUT RIVER 14016 9976 kEKIKTUK 14062 9996 ,,, Casing/Tubing Prol;ram: Hole size Csg/ Wt/Ft' Grade Conn Length Top Btm Tbg O.D. MDfrVD MDfrVD 13.5 10.75 45.5 80 BTC 4360 0 4360/4356 ,,, 9.875 7.625 29.7 80 NSC 14522 0 14522/10196 C .;:' i E6EiVE[) MAY 11 lqq.~ Well Plan Summary ~laska 0il & Gas Cons. Commission Page 1 Logging Program: [ Open Hole Logs: DIL/MSFL/LDT/CNL/GR FMT 10-15 points Cased Hole Logs: SBT Mud Program: [Special design considerations Surface Mud Properties: I SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 to tO tO tO tO tO tO 9.2 100 20-40 15-20 20-30 9-10 15-25 Intermediate Mud Properties: [ Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2-10.2 50 15-25 12-15 25-30 9.5-10 <12 tO tO tO tO tO tO tO 9.4 @ CRET Production Mud Properties: [ Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.8-10.2 50-6- 20-30 12-15 25-30 9.5-10.0 <6 to to to to to to to 10.2 KEK Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, B OPE and drilling fluid system schematics on file with AOGCC. Directional: I KOP: 1520o Maximum Hole Angle: Close Approach Well: Well Plan Summary 64..23 None RE£EIVED MAY 11 19.95 ] Pdaska 0il & Gas Cons. Commi~ion Page 2 The above listed wells will be secured during the close approach. Deep well intersection guidelines met on 3-41/K-39,3-39/J-39, and Duck Island #2 (Abandoned) Well Plan Summary RECEIVED MAY' 1 '/ Alaska 0il & Gas Cons. Corem/ss Anch0ra,-.~ ~nage 3 4-32/K-38 Drilling Hazards: 1) Thickness of the 3A3S is uncertain due to proximity to the LCU truncation. 2) Nearby well 3-45/M-39 is currently injecting water into the 3A2 and 3A3 and is the source of the potential WF.break through are the major uncertainties for the target 3A2,3A3. 3) A25' TVD coal 3A2C is expected between the 3A2 and 3A3 target sands. 4) Depth uncertainties for formation tops estimated at +/- 15 feet. 5) Pressure differential of up to 1000 psi are possible between the sands due to ofset production and injection. Zone Pressure Depth (TVDSS) 3A 4250 psi 10,000 2B 4400 psi 10,000 2A 4200 psi 10,000 Original reservoir pressure(4890 psi @ 10,000'TVDSS) may be encountered at any point within the Kekikmk, due to hydraulic discontinuties within the formation. 6) No anticipated anomalies are expected in the structure. 7) Gas: anticipated at 9900'TVSSS+/-10. 8) Water: anticipated at 10025' TVDSS +/- 25' (upper 2A intervel). REEEIVED MAY 'J 1 1995 /~iaska Oil & Gas Cons. Commission Anch0ra_,-~ 4-32/K-38 OPERATIONS SUMMARY: Dig out cellar, Weld on landing ring. Ensure landing ring is the proper height with Endicott Field personel. MIRU Doyon 15. Hold pre spud meeting with crew. 1. Drill 13-1/2" surface hole. Use gyro for close approach until magnetic interference is past. Check with Anadrill & Gyrodata to insure they are following JORPS. Drill hole to 4356' TVD. 2. Run 10-3/4" 45.5 ppf surface casing 3. Cement surface casing. 4. Perform top job, if necessary with 150 sx Type "E" Permafrost cement. 5. ND diverter. NU Bop's & test. 6. Drill out shoe and perform LOT. 7. Directionally drill production hole to 10.196 TVD. Well site geologist will help pick final TD (175' below lower most possible perforation in 3A). 8. A PDC should be picked up as the second 9-7/8" bit and drill the top 200-300' of the Tuffs. 9. Have sample catchers and well site geologist on site before drilling the Kekiktuk. 10. Use key seat wiper for Tuffs and HRZ. 11. RU E/Line & run open hole logs ("Triple Combo" ).+ FMT. 12. Run 7-5/8" production casing. Turbolators should be 2 per joint on the bottom 1000' of casing. 13. Run bond logs.(optional dependent on the mechanics of the cement job). 14. Run 4-1/2" 13CR-80 completion with hydraulic set permanent packer with WLEG 350' above the top of Kekiktuk (estimated WLEG @ 13,700' MD). 15. ND Bop's. NU 4~1/16" 5M# tree. Set packer and test.- 16. Freeze protect tbg. 17. RD MO Rig. RECEIVED MAY 1 1 1995 oit & Gas Cons. l;ornmi~ion 4-32/K-38 CEMENT PROGRAM- HALLIBURTON 10-3/4" SURFACE CASING CASING SIZE: 10-3/4", 45.5# CIRC. TEMP: 40°F LEAD CEMENT TYPE: Type 'E' Permafrost ADDITIVES: retarder WEIGHT: 12.0 ppg YIELD: 2.17 ft/sx MIX WATER: 11.63 gps APPROX. SACKS: 714 THICKENING TIME: 5+ hrs TAIL CEMENT TYPE: Premium ADDITIVES: 2% Calcium Chloride WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 5.00 gps APPROX. SACKS: 440 THICKENING TIME: 4 hrs TOP JOB CEMENT TYPE: Type 'E' Permafrost ADDITIVES: retarder WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx APPROX. SACKS: 150 MIX WATER: 11.63 gps SPACER: 100 bbls flesh water ahead of lead slurry. The mixing temperature should be as cold as possible to prevent acceleration-approximately 40 - 45 F. CEMENT VOLUME The objective is to get cement back to surface 1. Lead slurry w/30% excess over gauge hole. 2. Tail slurry to 3280' w/30% excess over guage hole. 3280 MD = top of SV shale 2. Top job volume 150 sx. 7 5/8" PRODUCTION CASING CASING SIZE: 7-5/8", 29.7# CIRC. TEMP 135°F TAIL CEMENT TYPE: Premium ADDITIVES: 0.2% CFR-3 (Dispersant) + 0.45% Halad-344 (Fluid Loss) + HR-5 (Retarder) WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 5.0 gps SACKS: 439 PUMP TIME: 4 hrs Retarder (HR-5) concentration will be based on actual lab tests. SPACERS: Pump 20 bbls Fresh Water; 70 bbls NSCI (Halliburton) spacer @ 11 ppg. OTHER CONSIDERATIONS: Batch mix tail slurry. Displace at 14 bpm with rig pumps. CEMENT VOLUME: Tail Slurry to 1000' above the Put River w/50% excess over gauge hole + 80£t. shoe. The estirnated MD of the Put River is 14016'. R' E~E IVE D Alaska Oil & Gas Cons. Commission .4nad£i.l l $chlumbe£ger 4-32/1<-38 (P PLAN VIEW CLOSUI~E ..... : 7335 feet at Azi~uth 56.13 DECLINATION.: 29.022 E SCAEE ...... .v:--l'--inch''=- 1000' feet DRA~'IN ....... :05/04/95 SHARED Marker Identi ficat ion HI) B) NUOGE BUILD 1.5/tO0 350 'C) END 1:5/100 BUILD ' 750 D) DROP l/tO0 1220 E) END t/t00 DROP iB2O F) 10-3/4" CAS[N6 4350 Gl KOP CURVE 2.5/100 5200 .................... Il}- END. 2,5/-100. CURVE .......... 7759 ......... 635 . II TAFIGET-tSD Fl RADIUS 14052 3653 ~] ID 1,15,~2 408,1] SERVICES DRILL i"' G 500 0 500 <- wES'I ' ERS1 -> (t, nod,'l Il (c)§3 4'124'-(:1tj Bi.bE I1: ]O ,~N 21 1000 1500 2000 2500 3000 3501} 4DOD 4500 5000 N/$ 0 -69 lO0 E/W 0 0 18 1084. 5749 6090 :;SOO BK)O 6500 7000 7500 8000 8,rx]lO f 500- ~800- 2400 , 3000- 3600 r' :'_- -. ' IH'A- Eb i,, · ~lsuo3 segl ~ I!0 I SERVICES DRILLING .......... ..,.,. ,n. -,k J 2/K-38 (Pi1) CAL SECTION VIEW" . . 55.4~ J ~nch = ~2.00 feet 4-3 VERTI Sect ion at: TVD Scale.: Dep Scale.: ~ inch = :~2'00 feet Or, awn ..... : 05/04/95 Anad~jll Schlumberger Marker idBntificat~on ND 8K8 SECTN INCLN ~) KB 0 0 0 0.00 ~] NUDG~ BUILD ~,5/130 350 350 0 0,00 CI E~D ~.5/~00 BUILD 750 749 -g 6.00 D] DROP i/loo ¢220 1217 -29 E) END J/t00 DROP 1820 18tS -42 0.00 F) J0-3/4" CASING 4360 4356 -42 0.00 G] KOP CURVE 2.5/100 5200 5196 -42 0~00 H) END 2.5/100 CURVE 7759 7259 1253 64.23 I) TARGET-150 FT RAO[U$ ~4062 9996 6920 64.23 .. dl TO 145a2 10]96 7335 64.23 . , -; .. ;..4 g- ¢~:,,-.~.~ .,. _--:....-.:. / ' H -- 1, -- I_I 600 1200 1800 2400 3000 3600 4200 4800 5400 BO00 6600 7200 7800 Sect ion Oeoant,.me I __ I , · -- -- -- - ill . · ~ i- · ' ' ',." -,;- ' PERMIT CHECKLIST com~Y ,~.~ CLASS WELL NAME GEOL AREA ADMINISTRATION ENGINEERING 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number. ............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary.. N 6. Well located proper distance from other wells ..... N '7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected party .............. N 10. Operator has appropriate bond in force ......... N 11. Permit can be issued without conservation order .... N 12. Permit can be issued without administrative approval.. N 13. Can permit be approved before 15-day wait ....... N GE~LO'GY 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ..................... 26. press rating adequate; test to ~6~ psig.~) BOPE 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of R2S gas probable ............ A~PR DATE 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones. .... Y//N 32. Seismic analysis 9f shallow gas zones. 34. Contact name/phone for weekly progress reports. . .~/- -. . Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Cumments/Instructions: HOW/Jo - A:U=ORMS~cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subf~ile 2 is tS : LIS TAPE HEADER ENDICOTT UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6452.00 J. DAHL SEE REMARKS REMARKS: 4 - 32/K- 38 500292255900 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 06-JUL-95 OPEN HOLE RUN 2 RUN 3 8 liN 17E 2600 677 56.00 56.00 14.50 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 10.750 4873.0 9.875 13300.0 DIFL/GR & ZDL/CN/GR. CIRCULATION STOPPED AT 23:00, 29-JUN-95. LOGS WITNESSED BY: P. BARKER & E. VAUGHN. TD NOT LOGGED DUE TO POSSIBLE HOLE PROBLEMS. DENSITY-NEUTRON COMBINATION ATTEMPTED WITH DIFL BUT UNABLE TO OBTAIN LOGS DUE TO MUDBALLING OF PAD TOOLS. (RAN SEPARATELY) PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CORRECTED FOR BOREHOLE SIZE (9.875"). THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. CALIPER DATA WAS NOT USED FOR DIL BOREHOLE CORRECTIONS BECAUSE THE CALIPER READ UNDER GAUGE THROUGH MUCH OF THE LOGGED INTERVAL DUE TO MUD BUILD UP ON THE TOOL. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER ~ .~RECTED, CHISM FILTERING IS ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped hole data. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 11722.0 DIL 11736.0 GRZ 12700.0 SDN 12700.0 2435 12700.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA STOP DEPTH 13200.5 13260.0 13206.0 13230.0 13212.0 GR from Induction tool. (MEASURED DEPTH) BASELINE DEPTH LL8 11837.0 11848.5 11864.0 11887.0 11899.0 11899.0 11912.5 11912.0 11920.5 11921.0 11931.0 11930.5 11943.0 11946.5 11948.5 11948.5 12042.5 12042.5 12068.5 12075.0 12074.5 12080.0 12079.5 12106.5 12109.0 12108.5 12120.5 12120.5 12123.0 12123.0 12227.5 12227.5 12236.5 12236.5 12245.0 12244.5 12270.5 12270.5 12273.0 12273.0 12273.5 12275.5 12276.0 12283.5 12283.5 12291.5 12313.5 12313.0 12324.0 12323.5 12344.0 12344.0 12370.0 12370.0 12373.0 12374.0 12376.0 12376.0 12394.0 12394.5 12396.0 12397.0 12408.5 12408.5 12424.5 12424.5 12482.0 12482.5 curves; all EQUIVALENT UNSHIFTED DEPTH ILD GRZ RHOB 11837.5 11848.5 11864.5 11887.5 11899.0 11912.0 11921.0 11930.5 11942.5 11946.0 11948.5 12042.5 12068.0 12074.5 12080.0 12106.0 12109.0 12120.5 12123.0 12227.5 12236.5 12244.5 12270.5 12273.0 12283.5 12291.5 12313.0 12323.5 12344.0 12370.0 12374.0 12376.0 12394.5 12397.0 12408.5 12424.5 12482.5 runs merged; NPHI no case 12499 .~0 12536.5 12595.5 12626.0 12641.0 12646.0 12648.5 12681.0 12681.5 12702.0 12702.5 12741.0 12742.5 12746.0 12750.0 12756.5 12771.0 12774.0 12791.5 12797.0 12812.5 12815.5 12816.0 12818.0 12821.0 12821.5 12823.5 12824. 0 12825.5 12826.0 12828.0 12833.0 12836.5 12837.0 12840.0 12841.0 12845.0 12878.5 12891.0 12893.5 12894.0 12900.5 12927.5 12931.5 12932.5 12956.5 12976.0 12986.5 12997.5 13000.5 13002.5 13004.0 13004.5 13027.0 13043.5 13054.5 13058.5 13059.5 13063.0 13063.5 2500.0 12596.0 12641.0 12681.5 12702.5 12741.0 12816.0 12819.0 12822.0 12824.0 12826.0 12890.0 12893.0 12901.5 12932.5 12956.5 12975.5 13005.0 13043.5 13059.0 12500.0 12537.0 12596.0 12626.0 12641.0 12645.5 12648.5 12681.5 12702.5 12741.5 12750.0 12815.0 12819.0 12822.0 12824.0 12826.0 12890.0 12893.0 12901.5 12932.5 12956.5 12986.5 12997.5 13005.0 13043.5 13059.5 13063.5 12741.0 12771.0 12775.0 12793.0 12798.0 12812.5 12816.0 12817.5 12820.5 12824.5 12826.5 12828.5 12833.5 12837.0 12840.5 12891.0 12893.5 12900.0 12931.5 12956.5 13054. 5 13063.5 12702.0 12740.0 12746.0 12756.5 12771.0 12774.0 12792.0 12798.0 12812.5 12815.5 12817.5 12820.0 12824.0 12825.5 12828.0 12833.0 12836.0 12839.0 12845.5 12878.5 12890.0 12892.5 12899.5 12928.0 12931.5 12956.0 12999.5 13003.0 13026.5 13042.5 13054.5 13063.5 12702.0 12740.0 12746.0 12756.5 12771.0 12774.0 12792.0 12798.0 12812.5 12815.5 12817.0 12821.0 12823.5 12825.0 12827.0 12836.0 12839.0 12845.0 12878.5 12891.0 12893.5 12901.0 12928.0 12931.5 12957.0 13000.5 13002.0 13004.0 13026.5 13055.0 13064.0 13069.0 13069.5 ±3070.0 13072.5 13074.5 13075.0 13076.5 13079.0 13079.5 13082.0 13082.5 13083.0 13083.5 13084.5 13084.5 13085.0 13086.0 13086.0 13086.5 13091.0 13094.0 13096.0 13099.0 13099.5 13102.5 13102.5 13104.5 13104.0 13106.0 13106.5 13106.5 13107.0 13109.5 13136.5 13136.0 13138.0 13138.5 13140.5 13140.0 13160.0 13159.5 13169.0 13167.5 13169.5 13171.5 13170.5 13172.0 13173.5 13173.0 13174.5 13194.0 13194.0 13194.5 13219.0 $ MERGED DATA SOURCE PBU TOOL CODE RUN NO. GR 1 DIL 1 GRZ 1 SDN 1 2435 1 $ REMARKS: MAIN PASS. 13069.0 13069.0 13070.0 13071.5 13075.0 13073.0 13076.5 13076.5 13076.5 13079.0 13078.5 13078.0 13079.5 13082.0 13082.0 13084.0 13084.0 13084.5 13086.0 13086.0 13086.0 13086.5 13090.5 13093.5 13095.5 13095.5 13095.0 13098.5 13098.5 13098.5 13102.0 13102.5 13102.0 13104.0 13104.0 13105.0 13106.5 13106.5 13109.0 13136.0 13136.5 13135.5 13135.5 13137.5 13137.5 13138.5 13140.0 13140.5 13140.5 13140.5 13159.5 13160.0 13160.0 13160.0 13167.5 13168.0 13168.0 13169.5 13170.5 13170.5 13170.5 13173.0 13173.5 13173.5 13173.5 13194.0 13195.0 13194.5 13194.5 13219.0 PASS NO. MERGE TOP MERGE BASE 4 11722.0 13200.5 4 11736.0 13260.0 2 12700.0 13206.0 2 12700.0 13230.0 2 12700.0 13212.0 "GRZ" REFERS TO THE GAMMA RAY RUN WITH ZDL/CN STRING. MTEM, SP, TEND, & TENS (from Induction string) WERE SHIFTED WITH LL8. ILM, RT, & DI WERE SHIFTED WITH ILD. DRHO, PEF, CALl, MTEM, TEND, & TENS (from ZDL/CN string) WERE SHIFTED WITH RHOB. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT · /??MA5 z.OUT / ??MATCH2. OUT /??MATCH3 .OUT / ??MATCH4. OUT /??MATCH5. OUT $ : BP EXPLORATION (ALASKA) : 4 - 32/K- 38 : ENDICOTT : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR DIL 68 1 GAPI 2 LL8 DIL 68 1 OHMM 3 ILM DIL 68 1 OHMM 4 ILD DIL 68 1 OHF[M 5 RT DIL 68 1 OHMM 6 DI DIL 68 1 IN 7 SP DIL 68 1 MV 8 MTEM DIL 68 1 DEGF 9 TEND DIL 68 1 LB 10 TENS DIL 68 1 LB 11 GR SDN 68 1 GAPI 12 RHOB SDN 68 1 G/C3 13 DRHO SDN 68 1 G/C3 14 PEF SDN 68 1 BN/E 15 CALl SDN 68 1 IN 16 MTEM SDN 68 1 DEGF 17 TEND SDN 68 1 LB 18 TENS SDN 68 1 LB 19 NPHI 2435 68 1 PU-S 20 FUCT 2435 68 1 CPS 21 NUCT 2435 68 1 CPS 4 08 310 01 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 43 995 99 1 4 43 995 99 1 4 43 995 99 1 84 * DATA RECORD (TYPE# 0) Total Data Records: 283 974 BYTES * Tape File Start Depth = 13270.000000 Tape File End Depth = 11718.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 68311 datums Tape Subfile: 2 539 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 presented first (primary depth control string used for depth shifting) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11718.0 DIFL 11718.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR CN ZDL TEMP PCM ROLL DIFL ROLL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY TEMPERATURE PULSE CODE MODULATOR ROLLER SUB DUAL INDUCTION ROLLER SUB STOP DEPTH 13201.0 13260.0 30-JUN-95 FSYS REV. J001 VER. 1.1 2300 29-JUN-95 825 30-JUN-95 13300.0 13289.0 11730.0 13260.0 1800.0 TOOL NUMBER 3974XA 3967XA 3517NA 1309XA 24335XA 2222EA/2222MA 2806XA 3506XA 3927NA 1503XA 3927NA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 4873.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): LSND 10.30 55.0 9.8 5.6 173.0 1.870 68.0 ~MUD AT BOTt HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: DIFL MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4 - 32/K- 38 : ENDICOTT : NORTH SLOPE : ALASKA .778 173.0 1.720 68.0 .000 .0 1.980 68.0 .000 .0 .00 .000 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR DIFL 68 1 GAPI 4 2 RFOC DIFL 68 1 OHMM 4 3 RILM DIFL 68 1 OHMM 4 4 RILD DIFL 68 1 OHMM 4 5 VILD DIFL 68 1 MV 4 6 RT DIFL 68 1 OHMM 4 7 DI DIFL 68 1 IN 4 8 SP DIFL 68 1 MA; 4 9 TEMP DIFL 68 1 DEGF 4 10 CHT DIFL 68 1 LB 4 11 TTEN DIFL 68 1 LB 4 12 SPD DIFL 68 1 F/MN 4 4 07 310 01 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 995 46 1 4 07 120 46 1 4 07 120 44 1 4 07 010 01 1 4 07 660 99 1 4 07 635 99 1 4 07 635 99 1 4 07 636 99 1 48 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 327 Tape File Start Depth = 13270.000000 Tape File End Depth = 11718.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER * LIS representation code decoding summary: Rep Code: 68 80718 datums Tape Subfile: 3 405 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 presented first (primary depth control string used for depth shifting) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 2 PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 2 .2500 VENDOR TOOL CODE START DEPTH GR 12693.0 ZDL 12693.0 2435 12693.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : STOP DEPTH 13220.5 13244.0 13222.5 30-JUN-95 FSYS REV. J001 VER. 1.1 2300 29-JUN-95 2111 30-JUN-95 13300.0 13284.0 12700.0 13230.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN ZDL TEMP PCM $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY TEMPERATURE PULSE CODE MODULATOR TOOL NUMBER 3974XA 3517NA 1309XA 24335XA 2222EA/2222MA 2806XA 3506XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 4873.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: LSND 10.30 55.0 9.8 5.6 177.0 1.870 .761 1.720 .000 68.0 177.0 68.0 .0 ,MUD CAKE AT .~: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: ZDL/CN MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4 - 32/K - 38 : ENDICOTT : NORTH SLOPE : ALASKA .980 .000 THERMAL SANDSTONE 2.65 .000 .0 68.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR ZDL 68 1 GAPI 4 2 ZDEN ZDL 68 1 G/C3 4 3 ZCOR ZDL 68 1 G/C3 4 4 PE ZDL 68 1 BN/E 4 5 CAL ZDL 68 1 IN 4 6 HRD1 ZDL 68 1 CPS 4 7 HRD2 ZDL 68 1 CPS 4 8 SFT2 ZDL 68 1 CPS 4 9 SHR ZDL 68 1 4 10 TEMP ZDL 68 1 DEGF 4 11 CHT ZDL 68 1 LB 4 12 TTEN ZDL 68 1 LB 4 13 SPD ZDL 68 1 F/MN 4 14 CNC 2435 68 1 PU-S 4 15 CNCF 2435 68 1 PU-S 4 16 CN 2435 68 1 PU-L 4 17 LSN 2435 68 1 CPS 4 18 SSN 2435 68 1 CPS 4 4 46 310 01 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 354 02 1 4 46 354 01 1 4 46 354 99 1 4 46 995 99 1 4 46 660 99 1 4 46 635 99 1 4 46 635 99 1 4 46 636 99 1 4 43 995 99 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 72 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 173 Tape File Start Depth Tape File End Depth = 13253.000000 = 12693.000000 Tape· File Level ,acing = Tape File Depth Units = Feet · *** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 110891 datums Tape Subfile: 4 248 records... Minimum record length: 62 bytes Maximum record length: 994 bytes 0.250000 Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE S~RY VENDOR TOOL CODE START DEPTH GR 12760.0 DIFL 12760.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 13098.0 13157.0 30-JUN-95 FSYS REV. J001 VER. 1.1 2300 29-JUN-95 756 30-JUN-95 13300.0 13289.0 11730.0 13260.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS MODL GR CN ZDL TEMP PCM ROLL DIFL ROLL $ CABLEHEAD TENSION MASS ISOLATION SUB MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY TEMPERATURE PULSE CODE MODULATOR ROLLER SUB DUAL INDUCTION ROLLER SUB TOOL NUMBER 3974XA 3967XA 3517NA 1309XA 24335XA 2222EA/2222MA 2806XA 3506XA 3927NA 1503XA 3927NA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 4873.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): LSND 10.30 55.O 9.8 5.6 173.0 1.870 .778 68.0 173.0 MUD F'ILTRAT~ ~T MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: DIFL REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4 - 32/K - 38 : ENDICOTT : NORTH SLOPE : ALASKA 720 68.0 .000 .0 1.980 68.0 .000 .0 .00 .000 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Tool Code Samples Units 1 GR DIFL 68 1 GAPI 2 RFOC DIFL 68 1 OHMM 3 RILM DIFL 68 1 OHMM 4 RILD DIFL 68 1 OHMM 5 VILD DIFL 68 1 MV 6 RT DIFL 68 1 OHMM 7 DI DIFL 68 1 IN 8 SP DIFL 68 1 MV 9 TEMP DIFL 68 1 DEGF 10 CHT DIFL 68 1 LB 11 TTEN DIFL 68 1 LB 12 SPD DIFL 68 1 F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 07 310 01 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 995 46 1 4 07 120 46 1 4 07 120 44 1 4 07 010 01 1 4 07 660 99 1 4 07 635 99 1 4 07 635 99 1 4 07 636 99 1 48 * DATA RECORD (TYPE# 0) Total Data Records: 86 994 BYTES * Tape File Start Depth = 13167.000000 Tape File End Depth = 12759.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 101948 datums Tape Subfile: 5 163 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 2 PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12757.0 ZDL 12757.0 2435 12757.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 13172.5 13196.0 13174.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN ZDL TEMP PCM $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY TEMPERATURE PULSE CODE MODULATOR BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: 30-JUN-95 FSYS REV. J001 VER. 1.1 2300 29-JUN-95 2048 30-JUN-95 13300.0 13284.0 12700.0 13230.0 1500.0 TOOL NUMBER 3974XA 3517NA 1309XA 24335XA 2222EA/2222MA 2806XA 3506XA 9.875 4873.0 .0 LSND 10.30 55.O 9.8 5.6 177.0 1.870 .761 1.720 .000 1.980 68.0 177.0 68.0 .0 68.0 MUD CAKE AT .T: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: ZDL/CN REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : 4 - 32/K- 38 : ENDICOTT : NORTH SLOPE : ALASKA .000 THERMAL SANDSTONE 2.65 .000 .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR ZDL 68 1 GAPI 4 2 ZDEN ZDL 68 1 G/C3 4 3 ZCOR ZDL 68 1 G/C3 4 4 PE ZDL 68 1 BN/E 4 5 CAL ZDL 68 1 IN 4 6 HRD1 ZDL 68 1 CPS 4 7 HRD2 ZDL 68 1 CPS 4 8 SFT2 ZDL 68 1 CPS 4 9 SHR ZDL 68 1 4 10 TEMP ZDL 68 1 DEGF 4 11 CHT ZDL 68 1 LB 4 12 TTEN ZDL 68 1 LB 4 13 SPD ZDL 68 1 F/MN 4 14 CNC 2435 68 1 PU-S 4 15 CNCF 2435 68 1 PU-S 4 16 CN 2435 68 1 PU-L 4 17 LSN 2435 68 1 CPS 4 18 SSN 2435 68 1 CPS 4 4 46 310 01 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 354 02 1 4 46 354 01 1 4 46 354 99 1 4 46 995 99 1 4 46 660 99 1 4 46 635 99 1 4 46 635 99 1 4 46 636 99 1 4 43 995 99 1 4 43 995 99 1 4 43 890 01 1 4 43 334 31 1 4 43 334 30 1 72 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 138 Tape File Start Depth = 13205.000000 Tape File End Depth = 12757.000000 Tape File Level Spacing = 0.250000 Tape File Depth ~its = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 144959 datums Tape Subfile: 6 212 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 7 is type: LIS 95/ 7 / 6 01 **** REEL TRAILER **** 95/ 7/ 7 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 7 JLY 95 2:38p Elapsed execution time = 15.76 seconds. SYSTEM RETURN CODE = 0