Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-150 MICROFILMED .6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc CD4-301 Details ao~ -~1y ~~c~ ~ ~~~ Cement Detail Report -. R.. ~~~' Y CD4-301 ~- String: Surface Casing Cement Job: DRILLING ORIGINAL, 12/8/200714:00 Cement Details Description Surface Casing Cement Cementing Start Date 12/11/2007 23:06 Cementing End Date 12/12/2007 00:45 Wellbore Name CD4-301 Comment Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pump -Pumped 3 bbls water w/ Dowell -Pressure test lines to 4000 psi -Dropped btm plug -Mixed & pumped 50 bbls - 10.5 ppg MudPush @ 5.6 BPM @ 445 psi -Mixed & pump Lead slurry (ArcticSet Lite 3) 10..7 ppg @ 7.5 BPM @ 700 psi Pumped 165 bbls -Continue pumping lead slurry (ASL) 139 bbls @ 10.7 ppg 7.3 bbls/min @ 680 psi (304 bbls total pumped) observed nut plug marker @ shakers -pumped down surge can Pumped 321 bbls total bbls of lead slurry -Switched over to tail slurry Pumped 54 bbls tail slurry (Class G w/ .2% D046 + 1 % S2 + .2% D46 = .35 D65) @ 15.8 ppg @ 4.5 BPM @ 577 psi -Dropped top plug w/ 20 bbls water -Switched to rig pump & displaced w/ 204 bbls 9.8 ppg mud @ 7 BPM @ 438 to 620 psi -Slowed pump to 3.5 BPM for last 24 bbls @ 450 psi to 610 psi Bumped plug t/ 1000 psi - Checked floats OK - CIP @ 0045 hrs. - Recipocated pipe during job -full returns throughout - 125 bbls 10.7 ppg cmt returns to surface Cement Sta es Sta e # <Sta a Number?> Description Surface Casing Cement Objective Primary Top (ftKB) 36.0 Bottom (ftKB) 3,035.0 Full Return? Yes Cmnt Rtrn (... 125.0 Top Plug? Yes Btm Plug? Yes Q (start) (bbl/min) 8 O (end) (bbl/min) 4 l3 (avg) (bbl/min) 6 P (final) (psi) 617.0 P (bump) (psi) 551.0 Recip? Yes Stroke (ft) 25.00 Rotated? No Pipe RPM (rpm) Depth tagged (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids 8 Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 36.0 Est Btm (ftKB) 2,535.0 Amount (sacks) 389 Class G Volume Pumped (bbl) 322.0 Yield (ft /sack) 4.45 Mix H2O Ratio (gal/sa... 20.15 Free Water (%) Density (Ib/gal) 10.70 Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label !Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 2,535.0 Est Btm (ftK6) 3,035.0 Amount (sacks) 259 Class G Volume Pumped (bbl) 54.0 Yield (ft'/sack) 1.17 Mix H2O Ratio (gal/sa... 5.10 Free Water (°h) Density (Ib/gal) 15.80 Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label 'Sta e # <Sta a Number?> Description Objective Top (ftKB) Bottom (ftKB) Full Return? No Cmnt Rtrn (... Top Plug? No Btm Plug? No O (start) (bbl/min) Q (end) (bbl/min) Q (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Depth tagged (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment (Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (fN/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 5/5/2009 i Security Level: Development Daily Drilling Report CD4-301 Report Number: 4 .- :~r .. Rig: DOYON 19 Report Date: 12111/2007 AFE Type Network/tD # Total AFE+Sup Drilling 10200417 11,750,000.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftK6) Depth End (ftK6) CD4-301 Development NANUO KUPARUK 2.55 4.0 86.00 2,960.0 3,046.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 7,047.62 48,193.32 325,333.62 846,542.32 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 12/8/2007 12/9/2007 32.61 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftK6) SURFACE, 3,035.1ftKB Ops and Depth @ Morning Report 24hr Forecast Prep to PU 5" DP PU & std back 5" DP -Test BOPE Last 24hr Summary Drill 12 1/4" to 3046' TD -Circ hole clean -Wiper trip to 895' (Top of HWDP) -Flow ck OK -RIH - circ hole clean -POOH on TT - f/ 3046' to 895' -Flow ck OK - Std back HWDP - LD BHA - RU & run 9 5/8" csg to 3035' (78 jts) RD csg tools - RU cmt head & lines -Circ & cond. mud & hole for cmtjob - Begin 9 5/8" cmt job --Pump water spacer w/ Nut pl ug for marker -Test lines to 4000 psi OK -Pumped 50 bbls MudPush @ 10.5 ppg -Mixed & pumped 165 bbls of lead slurry(ASL-3) @ 10.7 ppg General Remarks Weather Head Count 1/-13 we / SW @ 8 mph / Vis 10 miles 46.0 Supervisor Title Dave Burley, Rig Supervisor Rig Supervisor Don Mickey, Rig Supervisor Rig Supervisor Randy Dexter, Rig Supervisor Rig Supervisor Time Lo '. Start End Dur Tlme Depth Start Depth End ~~. Time Time (hrs) Phase Op Code Activity Code P-T-X Trbl Code Trbl Class. (ftKB) (ftK8) Operation 00:00 01:00 1.00 SURFAC DRILL DDRL P 2,960.0 3,046.0 Drill 12 1/4" hole w/ motor f/ 2960' to 3046' MD 2391 TVD ADT - 0.87 hrs =ART- 0.72 hrs AST - 0.15 hrs. WOB 25/35K RPM 60, GPM 625 @2120 psi String wt PU 130, SO 123, Rot 130 Totque on/off btm 9500/6500 ft/Ibs 01:00 01:45 0.75 SURFAC DRILL CIRC P 3,046.0 3,046.0 Circulate hole clean - 625 gpm / 1835 psi / 60 rpm 01:45 05:30 3.75 SURFAC DRILL TRIP P 3,046.0 890.0 Perform wiper trip from 3,046' to 890' - 550 gpm / 1500 psi / 60 rpm -reduced rate to 450 gpm from 1,557' - no problems -flow check well, static 05:30 06:30 1.00 SURFAC DRILL TRIP P 890.0 2,989.0 RIH from 890' to 2,989' 06:30 07:30 1.00 SURFAC DRILL CIRC P 2,989.0 3,046.0 Precautionary wash and ream from 2,989' to 3,046' -Circulate hole clean - 600 gpm / 1760 psi / 60 rpm -mud wt. in & out @ 10.0 ppg -flow check well, static 07:30 09:45 2.25 SURFAC DRILL TRIP P 3,046.0 890.0 POOH on tt from 3,046' to 890' -hole appears in good condition -flow check well, static 09:45 12:00 2.25 SURFAC DRILL TRIP P 890.0 68.0 POOH -stand back hwdp - LD jars and NMDC's& UBHO sub 12:00 13:15 1.25 SURFAC DRILL PULD P 68.0 0.0 LD BHA components -clear tools from floor -clean rig floor 13:15 14:45 1.50 SURFAC CASING RURD P 0.0 0.0 RU to run 9 5/8" casing 14:45 15:00 0.25 SURFAC CASING SFTY P 0.0 0.0 Held Pre-job Safety and Opts meeting with crew Latest BOP Test Data Date Comment Page 1/3 Report Printed: 5/5/2009 ~t Security Level: Development '~ `' Daily Drilling Report CD4-301 Report Number: 4 r.., Rig: DOYON 19 Report Date: 12/11/2007 Time Lo Start End Dur Time Depth Start Depth End Time Time (hrs) Phase Op Code Activity Code P-T-X Trbl Code Trhl Class. (ftKB) (ftKB) Operation 15:00 18:30 3.50 SURFAC CASING RNCS P 0.0 1,726.0 Ran 9 5/8" 40# L-80 MBTC csg as follows: FS(Ray Oil Tool Ssilver bullet) 2 jts csg - FC( Halliburton Super seal) 2 jts csg - 4 jts total (made up w/ BakerLoc - fill pipe & check floats OK) Ran 41 jts 9 5/8" 40# L-80 MBTC csg (45 jts total) to 1726' 18:30 19:00 0.50 SURFAC CASING CIRC P 1,726.0 1,726.0 Break circ - Circ pipe volume -ICP 350 psi @ 3.5 bbls/min -FCP 200 psi @ 4.5 bbls/min 19:00 20:45 1.75 SURFAC CASING RNCS P 1,726.0 3,035.0 Continue running 9 5/8" 40# L-80 MBTC csg 33 jts f/ 1726' to 2996' (78 total jts ran) - PU hanger & landing jt. -Land csg w/ FMC fluted hanger on landing ring w/ FS @ 3035' - FC @ 2955' 20:45 21:00 0.25 SURFAC CASING OTHR P 3,035.0 3,035.0 RD csg equipment & fill-up tool - MU cmt head & lines 21:00 22:30 1.50 SURFAC CEMENT CIRC P 3,035.0 3,035.0 Break circ -Stage pump up to 6.5 bbls/min -ICP - 210 psi @ 1 bbl/min - FCP - 260 psi @ 6.5 bbls/min 22:30 22:45 0.25 SURFAC CEMENT SFTY P 3,035.0 3,035.0 PJSM w/ crew on cementing 22:45 00:00 1.25 SURFAC CEMENT DISP P 3,035.0 3,035.0 Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pump -Pumped 3 bbls water w/ Dowell -Pressure test lines to 4000 psi -Dropped btm plug -Mixed & pumped 50 bbls - 10.5 ppg MudPush @ 5.6 BPM @ 445 psi -Mixed & pump Lead slurry (ArcticSet Lite 3) 10.7 ppg @ 7.5 BPM @ 700 psi Pumped 165 bbls Mud Check Data YP Calc Gel (10s) Get (10m) Gel (30m) HTHP Filt Density Temp Sollds, Corr- Type Depth (ftKB) Dens (Iblgal) Vis (s/qq PV Calc (cp) (Ibf/100ft') (Ibf/100ft') (IbfN00ft') (Ibfl100ft') MBT (Ib/bbl) (mLl30min) pµ (°F) (%) SPUD 3,046.0 65 25.0 19.0 5.0 7.0 8.000 32.5 9.0 5.2 In'ection Fluid Fluid Source From Lease (bbl) Destination Vendor Manifest Number Note Diesel 53.0 CD4-322 Freeze protect Fresh Water 150.0 CD4-322 Annular flush Water Based Mud CD4-301 177.0 CD4-322 Drill Strin s: BHA No. 1 - 8" Mud Motor 4/5 5.3st /Bit Run No. 1 - 12 1/4in, Smith, TCT11 E, PG4071 Depth In (ftKB) Depth Out (ftKB) TFA (incl Noz) (in') Nozzles (/32") IADC Bit Dull String Wt (10001bf) 114.0 3,046.0 0.76 12/15/14/15/14 1-3-WT-G-4-1-NO-TD 44 Drill Strin Com onents Jts Item Description OD (in) ID (in} Top Conn Sz (in) Top Thread Cum Len (ft) Mud Motor 8 5.000 6 5/8 H 90 31.77 Float Sub 8 2.750 6 5/8 H 90 34.17 integral Blade Stabilizer 8.11 2.813 6 5/8 H 90 40.90 XO Sub 8.05 3.000 6 5/8 H 90 43.32 MWD (Directional) 8 1.920 6 5/8 Reg 52.52 MWD HCIM 7.98 1.920 6 5/8 Reg 61.11 MWD TM 8 1.920 6 5/8 H 90 70.86 Non Mag UBHO Sub 7.88 2.750 6 5/8 H 90 73.21 NMDC 7.67 2.813 6 5/8 H 90 104.19 NMDC 8.11 3.313 6 5/8 H 90 134.93 Drilling Jars -Mechanical 7 3/4 2.750 4 1/2 IF 170.25 Page 2/3 Report Printed: 5/5/2009 ig: DOYON 19 Daily Drilling Report CD4-301 ~' Security Level: Development Report Number: 4 Report Date: 12/11!2007 Drill Strin Com onents Jts Item Descrlptlon OD (in) ID (In) Tap Conn Sz (in) Top Thread Cum Len (ft) 24 HWDP 5) 3.000' 4 1/2 IF 895.75 Drillin Parameters Start (ftKB) End (ftKB) Cum Depth (ft) Cum Drill Time (hrs) Sliding Time (hrs) Flow Rate (9Pm) ~9Pm) WOB (Ibf~ RPM (~Pm) ~ SPP (psi) PU Str Wt (10001bf) Drill Str Wt SO Str Wt (10001b~ (100016f) Off Btm Tq Drill Tq 2,960.0 3,046.0 2,932.00 27.35 625 35.0 60 2,120.0 ' 130 130 123 6,500.0 9.500.0 Wellbores Wellbore Name CD4-301 Wellbore APIIUWI 501032055700 Section Size (in) Act T op (ftKB) Act Btm (ftKB) Start Date End Date PROD1 COND1 SURFAC INTRM1 6 1/8 36 12 1 /4 8 3/4 36.0 114.0 3,046.0 3 15 114.0 , 046.0 ,883.0 12/3/2007 12/9/2007 12/13/2007 12!4/2007 12/11 /2007 12/18/2007 Surve Data MD (ftKB) Inc! (°) Azm (°) ND (ftKB) VS (ft) NS (ft) EW (ft) DLS (°/100ft) ' ~ 2,997.08 68.00 107.88 2,372.67 1,035.83 -464.74' 1,340.77 2.15 ',Cement Surface Casin Cement -Started 12/11/2007 Type casing Wellbore CD4-301 Cemented String SURFACE, 3,035.1ftKB Cement Evaluation Results Stg No. Description Surface Casing Cement Top (ftKB) 36.0 Bottom (ftKB) 3,035.0 Q (end) (bbl/... 4 P (final) (psi) 617.0 Fluid C(a§s Amount (sacks) V (bbl) Density (Iblgal) Yeld(ft'Isack) Est T op (ftKB) Est Btm (ftKB) Lead Cement G Tail Cement G 389 259 322.0 54.0 10.70 15.80 4.45 1.17 36.0 2,535.0 2,535.0 3,035.0 Stg No. Description Top (ftKB) Bottom (ftKB) Q (end) (bbl/... P (final) (psi) Page 3/3 Report Printed: 5/5/2009 Security Level: Development - Daily Drilling Report ,~ CD4-301 Report Number: 5 Rig: DOYON 19 Report Date: 12/12/2007 AFE Type Network/ID # Total AFE+Sup Drilling 10200417 11,750,000.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftKB) Depth End (ftKB) CD4-301 Development NANUO KUPARUK 3.55 5.0 0.00 3,046.0 3,046.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 2,000.00 50,193.32 215,086.00 1,061,628.32 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 12/8/2007 12/9/2007 32.61 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftKB) SURFACE, 3,035.1ftKB Ops and Depth @ Morning Report 24hr Forecast Making up BHA clean out shoe trk, perform FIT & Drill 8 3/4 hole Last 24hr Summary Continued pumping lead slurry (A SL) 139 bbls @ 10.7 ppg. Pumped 321 total bbls total of lead slurry -Switched over to tail slurry, pumped 54 bbls tail slurry @ 15.8 ppg @ 4.5 BPM @ 577 psi -Dropped top plug w! 20 bbls water -Switched to rig .pump & displaced w/ 204 bbls 9.8 ppg mud -Bumped plug t/ 1000 psi - Checked floats OK -Full returns t hroughout - 125 bbls 10.7 ppg cmt returns to surface. Rigged up and attempted to test 9 5/8" surface casing -test failed. Install well head -tested good to 1000 psi/10 min. N/U BOPE, riser, flowline and wear bushing. RIH picking up and standing back 180 Jts of 5" DP, RIH with 5" DP to 2850', rigged up to test 9 5/8" casing -tested good @ 3500 psi for 30 min. continued standing back 5" DP . RU to test BOPE: Annulus tested good 250/2500 psi for 5 min. General Remarks Weather Head Count 6/-12 WC / W@16 mph/ vis 10 miles 46.0 OC@8000' Supervisor Title Dave Burley, Rig Supervisor Rig Supervisor Don Mickey, Rig Supervisor Rig Supervisor Randy Deader, Rig Supervisor Rig Supervisor Time Lo Start End Dur Time Depth Start Depth End Time Time (hrs) Phase Op Code Activity Code P-T-X Trbl Code Trbl Class (ftKB) (ftKB) Operation 00:00 00:45 0.75 SURFAC CEMENT DISP P 3,035.0 3,035.0 Continue pumping lead slurry (ASL) 139 bbls @ 10.7 ppg 7.3 bbls/min @ 680 psi (304 bbls total pumped) observed nut plug marker @ shakers -pumped down surge can Pumped 321 bbls total bbls of lead slurry -Switched over to tail slurry Pumped 54 bbls tail slurry (Class G w/ .2%D046+1%S2+.2%D46=.35 D65) @ 15.8 ppg @ 4.5 BPM @ 577 psi - Dropped top plug w/ 20 bbls water - Switched to rig pump & displaced w/ 204 bbls 9.8 ppg mud @ 7 BPM @ 438 to 620 psi -Slowed pump to 3.5 BPM for last 24 bbls @ 450 psi to 610 psi Bumped plug. t/ 1000 psi -Checked floats OK - CIP @ 0045 hrs. - Recipocated pipe during job -full returns throughout - 125 bbls 10.7 ppg cmt returns to surface 00:45 01:30 0.75 SURFAC CASING DHEO T Non-rig Well testing 3,035.0 3,035.0 RU and attempted to test casing - Surface Eqp equip change out sensor and attempt to test casing -pressure not building to schedule -total of two bbls pumped 01:30 03:00 1.50 SURFAC CASING RURD P 0.0 0.0 RD Cement head, elevators, long bails - LD Landing joint 03:00 04:00 1.00 SURFAC CASING RURD P 0.0 0.0 PJSM - RD flow line and Riser 04:00 04:45 0.75 SURFAC CASING NUND P 0.0 0.0 Remove speed head from Conductor - Install FMC Wellhead -test M/M seals to 1000 psi for 10 min. -Install short bails and 5" D. P. elevators Latest BOP Test Data Date Comment Page 1/2 Report Printed: 5/5/2009 A ~;~,;,;~ Security Level: Development Daily Drilling Report.. ~~ ~ CD4-301 w •..' Report Number: 5 Rig: DOYON 19 Report Date: 12/12/2007 ..Time Lo '. Start ~'. Time End Time Dur (hrs) Phase Op Code Activity Code Tlme P-T-X Trbl Code Trbl Class. Depth Start (ftKB) Depth End (ftKB) Operation 04:45 07:00 2.25 SURFAC WELCTL NUND P 0.0 0.0 NU BOP stack, riser and flowline -install wear bushing 07:00 07:30 0.50 SURFAC DRILL OTHR P 0.0 0.0 PU and spot GeoSpan skid onto rig floor 07:30 11:30 4.00 SURFAC DRILL PULD P 0.0 0.0 RIH picking up 5" drill pipe (90 jts) - POOH, stand back drill pipe 11:30 15:00 3.50 SURFAC DRILL PULD P 0.0 0.0 RIH picking up 5" drill pipe (90 jts) - POOH, stand back drill pipe 15:00 17:00 2.00 SURFAC DRILL PULD P 0.0 0.0 RIH picking up 5" drill pipe to 2850' (90 jts) 17:00 18:00 1.00 SURFAC CASING DHEQ P 0.0 0.0 RU and test 9 5/8" casing to 3500 psi for 30 minutes - RD and blow down lines 18:00 21:45 3.75 SURFAC DRILL PULD P 0.0 0.0 Continue RIH picking up & standing back 5" DP - 339 total jnts 21:45 22:15 0.50 SURFAC DRILL PULD P 0.0 0.0 Pull wear bushing 22:15 00:00 1.75 SURFAC WELCTL BOPE P 0.0 0.0 PJSM, Rig up and test BOPE Annulus - 250 low/2500 high for 5 min -test good 'Mud Check Data ', Type Depth (ftK6) Dens (Ib/gal) Vis (slgt) PV Calc (cp) YP Calc (Ibfl'IOOft') Gel (10s) (Ibf1100ft~) Gel (10m) Gel (30m) (Ibfl100ft~} (Ibf/100ft') MBT (Ibfbbl) HTHP Fllt (mL/30mIn) pH Density Temp Solids, Corr. (°F) (%) Spud Mud 3,046.0 9.70 52 18.0 19.0 6.0 9.0! 11.000 1 0.5 9.0 I 8.5 In'ection Fluid Fluid Source From Lease (bbl) Destination Vendor Manifest Number Note Diesel 43.0 CD4-322 Freeze protect Fresh Water 190.0 CD4-322 Auunlar flush Water Based Mud CD4-301 1764.0 CD4-322 Drill Strin s: BHA No. 1 - 8" Mud Motor 4/5 5.3st !Bit Run No. 1 - 12 1/4in, Smith, TCT11 E, PG4071 Depth In (ftK6) Depth Out (ftKB) TFA (incl Noz) (ins) Nozzles (132") IADC Bit Dull String Wt (10001bf) 114.0 3, 046.0 0.76 12/15/14/15/14 1 -3-WT-G-4-1-NO-TD 44 Drill Strin Com onents , . Jts Item Description OD (in) ID (in) Top Conn Sz (in) Top Thread : Cum Len R Mud Motor 8 5.000 6 5/8 H 90 31.77 Float Sub 8 2.750 6 5/8 H 90 34.17 Integral Blade Stabilizer 8.11 2.813 6 5/8 H 90 40.90 XO Sub 8.05 3.000 6 5/8 H 90 43.32 MWD (Directional) 8 1.920 6 5/8 Reg 52.52 MWD HCIM 7.98 1.920 6 5/8 Reg 61.11 MWD TM 8 1.920 6 5/8 H 90 70.86 Non Mag UBHO Sub 7.88 2.750 6 5/8 H 90 73.21 NMDC 7.67 2.813 6 5/8 H 90 104.19 NMDC 8.11 3.313 6 5/8 H 90 134.93 Drilling Jars -Mechanical 7 3!4 2.750 4 1/2 IF 170.25 24 HWDP 5 3.000 4 1/2 IF 895.75 Wellbores Wellbore Name Wellbore APIIUWI CD4-301 501032055700 '~ Section Size (inj Act Top (ftKB) Act Btm (ftKB) Start Date End Date PROD1 6 1/8 COND1 36 36.0 114.0 12/3/2007 12/4/2007 SURFAC 12 1 /4 114.0 3,046.0 12/9/2007 12/11 /2007 INTRM1 8 3/4 3,046.0 15,883.0 12/13/2007 12/18/2007 Page 2/2 Report Printed: 5/5/2009', PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD4-301 Rig: Doyan 19 Date: 12113/2007 Volume In ut Volume/Stroke Pum Rate: Drilling Supervisor: D. Burley / D. MlCkey Pump Used: #2 Mud Pump ~ Strokes ~ 0.1000. Bbls/Strk ~ 8.0 Strk/min ~ Type of Test: Casing Shoe Test LOT/FIT ~ Pumping down annulus and DP. ~ Casin Test Pressure In te ri Test Hole Size: 8-3/4" ~ Casin Shoe De th Hole De th Pum in Shut-in Pum in Shut-in RKB-CHF: 36.0 Ft 3,035 Ft-MD 2,387 Ft-TVD 3,066 Ft-MD 2,398 Ft-TVD Strks si Min si Strks si Min si Casino Size and Description: 9-s/s" 40#/Ft L-80 BTC ~ 4 4 0 `3450 0 ' 15 0 ' 780 Casin Test Pressure Int e ri Test 2 110 1 3450 1 40 0.25 660 Mud Weight: 9.9 ppg Mud Weight: 9.6 ppg 4 270 2 3450 2 95 0.5 ' 640 Mud 10 min Gel: 48.0 Lb/100 Ft2 Mud 10 min Gel: 14.0 Lb/100 Fit 6 460 3 3450 3 180 1 625 Test Pressure: 500 3 psi Rotating Weight: Lbs 8 650 4 3450 4' 280 1.5 6 Rotating Weight: , 400 125 Lbs BlockslTop Drive Weight: 75,040 Lbs 10 820 5 3450 5 390 2 61 Blocks/Top Drive Weight: , 444 75 Lbs Desired PIT EMW: 18.4 ppg 12 960 6 344Q 6 500 2.5 610!: , Estimates for Test: 2.7 bbls Estimates for Test: 1043 si 1 bbls 14 1104 7 340 7 594 3 610 ~ ~ 16 1.240. 8 3440 8 650 3.5 605 EMW =Leak-off Pressure + Mud Weight = 650 PIT 15 Second 18 1420 9 3440 9 694 4 600 + 9.6 0.052 x TVD 0.052 x 2387 Shut-in Pressure si 20 1594 10 344th 10 720 4.5 600 EMW at 3035 Ft-MD (2387 Ft-TVD) = 14.8 660 22 1760 15 3440 11 750 5 600 L t 20 i d i t t held 24 1930 20 3430 12 770 5 5 600 4000 os ps ur n , g es . 4 °~ f t t 780 6 600 99. o es pre ssure . 26 2140 25 3430. 13 28 2300 30 3430 14 780 6.5 595 3500 * ~~~;~~~ ~«x_ ~~~ ~~ " "°~° '*' 30 2520 15 780 7 590 32 2760 7.5 590 3000 34 '2990 8 590!: 8 5 590 36 3210 . w 2500 ~ 38 3470 9 590 ~ 9.5 59 N 2000 10 5 w c o d 1500 1000 500 0 0 2 5 30 0 1 Barrel 2 s ~~ 3 4 0 5 S 1 hut- O P 0 1 In tim IT P i 5 2 e, M t inute s Volume Pum ed Volume Bled Back Volume Pum ed Volume Bled Back ~~CASING T EST LEAK-O FF TEST o n 3.8 Bbls Bbls 1.5 Bbls Bbls Comments: Tested 9 518°` csg while picking up 5" DP Cement Detail Report ~, CD4-301 String: Production Casing Cement Job: DRILLING ORIGINAL, 12/812007 14:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Production Casing Cement 1/8/2008 15:30 1/8/2008 18:15 CD4-3018 Comment Perform 1st stage cement job as follows: Pump 5 bbls CW-100 -Test lines to 4400 psi - Drop bottom plug -Pump 35 bbls CW-100 @ 4 bbls/min @ 800 psi - Pump 40 bbls MudPush @ 10.5 ppg @ 4 bbls/min @ 800 psi -Mix & pump 88 bbls (148 sks) 11.0 ppg Lead slurry (LiteCrete w/ .4% D046, 1 % D065, .01 B155, .25%D167) @ 5 bbls/min @ 900 psi -Mix & pump 22 bbls (107 sks) 15.8 ppg tail slurry (Class G w/ .2% D046, .25% D065, .25% D800,.18% D167) @ 3 bbls/min @ 600 psi -Drop top plug w/ 10 bbls water f/ Dowell -Switched over to rig pumps & displaced w/ 238 bbls 10.7 ppg inhibited CaCl2 @ 5 bbls/min @ 570 psi & 315.4 bbls 10.7 ppg CaCl2 @ 6 bbls/min @ 760 psi -slowed pumps to 4 bbls/min for last last 13 bbls -Bumped plug w/ 1500 psi - CIP @ 1815 hrs. -Checked floats OK -Full returns through job -Unable to move pipe during job. Cement Sta es Sta e # 1 Description Objective Top (ftKB) Bottom (ftKB) Full Return? Cmnt Rtrn (... Top Plug? Btm Plug? Production Casing 12,084.0 14,855.0 Yes Yes Yes Cement Q (start) (bbl/min) Q (end) (bbl/min) Q (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 4 5 560.0 1,500.0 No No Depth tagged (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Lead Cement 12,084.0 14,355.0 148 LiteCrete 85.0 Yield (fP/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 3.35 11.22 11.00 Additives Additive Type Concentration Conc Unit label 'Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 14,355.0 14,855.0 105 G 22.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 7 (psi) 1.16 15.80 15.80 Additives Additive Type Concentration Conc Unit label Sta e # 2 Description Objective Top (ftKB) Bottom (ftKB) Full Return? Cmnt Rtrn (... Top Plug? Btm PIug1 Production Casing 7,160.0 8,292.0 Yes Yes No Cement O (start) (bbllmin) Q (end) (bbl/min) Q (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 4 1 4 760.0 1,500.0 No No Depth tagged (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 7,160.0 8,289.0 204 G 42.0 Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Iblgal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) 1.16 5.10 15.80 Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 5/5/2009 " . ; : ~..~: ~~ ,_ ,. Cement Detail Report CD4-301 String: Production Casing Cement Job: Cement Details Description Production Casing Cement Cementing Start Date 1/9/2008 21:30 Cementing End Date 1/9/2008 22:30 Wellbore Name CD4-3016 Comment Tail slurry (Class G w/ .2% D046, .3% D065, 1 % S002)) @ 4 bbls/min @ 400 psi - Drop Dart w/ 10 bbls water f/ Dowell -Switched over to rig pumps & displaced w! 67 bbls 10.7 ppg un-inhibited brine @ 210 gpm @ 570 psi -Bumped Dart w/ 1800 psi - CIP @ 2230 hrs. Cement Sta es Sta e # <Sta a Number?> Description Objective Top (ftK6) Bottom (ftK6) Full Return? No Cmnt Rtrn (... Top Plug? No Btm Plug? No Q (start) (bbl/min) Q (end) (bbl/min) Q (avg) (bbl/min) P (final) (psi) P (bump) (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Depth tagged (ftK6) Tag Method Depth Plug Drilled Out To (ftK6) Drill Out Diameter (in) Comment Cement Fluids 8 Additives Fluid Fluid Type Fluid Description Estimated Top (ftK6) Est Btm (ftK6) Amount (sacks) Class Volume Pumped (bbl) Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cp) Thickening Time (hrs) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 5/5/2009 ~ ~ Security Level: Development `~`~~ Daily Drilling Report CD4-301 Report Number: 31 ,~ , Rig: DOYON 19 Report Date: 1/7/2008 AFE Type Network/ID # Total AFE+Sup Drilling 10200417 11,750,000.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftKB) Depth End (ftKB) CD4-3018 Development NANUQ KUPARUK 29.55 31.0 0.00 14,860.0 14,860.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 7, 795.13 1, 002,900.86 158,176.13 10,229,359.86 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 12/8/2007 12/9/2007 32.61 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftKB) SURFACE, 3,035.1ftKB Ops and Depth @ Morning Report 24hr Forecast Circ & condition mud @ 13,202' Finish running 7" csg & cement Last 24hr Summary Finish Down load MWD - LD MWD & GP -Change top pipe rams to 7" & test - RU to run7" csg -PJSM -Run 7" csg to 9799' (230 jts of 348 to run) General Remarks Weather Head Count -42 / -65 we / S@ 8 mph / Vis. 5 miles 48.0 ' Supervisor Title Donnie Lutrick, Rig Supervisor Rig Supervisor Don Mickey, Rig Supervisor Rig Supervisor Randy Dexter, Rig Supervisor Rig Supervisor Time Lo ''.. Start Time End Time Dur (hrs} phase Op Code Activity Code Time p-T-X Trbl Code Trbl Class. Depth Start (ftKB) Depth End (ftK6) Operation 00:00 01:00 1.00 INTRM2 DRILL PULD P 83.0 0.0 UD MWD, NIMPC, GP, subs & GS Clear floor and LD elevators & bales 01:00 02:15 1.25 INTRM2 DRILL RURD P 0.0 0.0 PJSM, change to 7" RAMS & 4" saver sub. 02:15 03:15 1.00 INTRM2 WELCTL BOPE P 0.0 0.0 Pull wear ring and set test plug, R/U test equipment, test 7" RAMS - 250/low 3500 psi high, test good R/D test equipment. 03:15 04:00 0.75 INTRM2 CASING RURD P 0.0 0.0 Pull test plug & set thin wall wear ring. 04:00 05:30 1.50 INTRM2 CASING RURD P 0.0 0.0 RU csg equipment 05:30 06:00 0.50 INTRM2 CASING SFTY P 0.0 0.0 PJSM on running 7" casing 06:00 09:30 3.50 INTRM2 CASING RNCS P 0.0 2,983.0 Run 7" 26# L-80 BTCM as follows: FS( Ray Oil Tools Silver Bullet) 2 jts. csg - FC (Halliburton Super Seal) 2 jts, csg First four jts. made up w/ BakerLoc -fill pipe & check floats) 66 jts csg (70 jts total) to 2983' 09:30 10:00 0.50 INTRM2 CASING CIRC P 2,983.0 2,983.0 Circulate one csg volume at 9 bpm - 750 psi. 10:00 14:30 4.50 INTRM2 CASING RNCS P 2,983.0 6,395.0 Continue running 7" 26# L-80 BTCM csg f/ 2983 to 6395' (150 jts total) 14:30 15:45 1.25 INTRM2 CASING CIRC P 6,395.0 6,395.0 Break Circ & stage pumps up to 4.5 bbls/min -Circ btms up + & condition mud @ 370 psi - PU wt. 170 SO wt 130 15:45 21:00 5.25 INTRM2 CASING RNCS P 6,395.0 9,799.0 Continue running 7" 26# L-80 BTCM csg f/ 6395' to 9799' (230 jts. total) 21:00 00:00 3.00 INTRM2 CASING CIRC P 9,799.0 9,799.0 Break circ & stage pumps up to 4.3 bbls/min -Circ btms up + to condition mud - FCP 500 psi PU wt. 220 SO wt. 125 ',Mud Check Data Type Depth (ftKB) Dens (Ib/gal) Vis (s/qt) PV Calc (cp) YP Calc (Ibf/100ft~) Gel (10s) (Ibf1100ft~) Gel (10m) (Ibfl100ft') Gel (30m) (Ibfl100ft'} MBT (Ib/bbl) HTHP Filt ~mU30min) pff Density Temp (°F) Solids, Corr. (% ) LSND / 14,860.0 10.80 42 12.0 20.0 8.0 9.0 10.000 9.6 6.2 9.5 14.0 Inhibycol Latest BOP Test Data Date Comment 12/29/2007 Tested Annular to 250 & 2500 is / VBR Blinds all vavles to 250 & 3500 si witnessin of test waived b AOGCC Page 1/2 Report Printed: 5/5/2009 Security Level: Development Daily Drilling Report '~"" ~ CD4-301 Report Number: 31 Rig: DOYON 19 Report Date: 1/7/2008 In'ection Fluid Fluid Source From Lease (bbl) Destination Vendor Manifest Number Note Diesel 15.0 CD4-322 ' I Freeze protect ~ Wellbores Wellbore Name Wellbore API/UWI CD4-3016 501032055702 Section Size (in) Act Top (ftK6) Act Btm (ftK6) Start Date End Date PROD1 6 1/8 COND1 18 36.0 114.0 12/3/2007 12/4/2007 SURFAC 12 1 /4 114.0 3, 046.0 12/9/2007 12/11 /2007 INTRMI 8 3/4 3,046.0 15,883.0 12/13/2007 12/18!2007 INTRM1 8 3/4 9,595.0 14,860.0 1/1/2008 1/5/2008 LINER B 6 1/8 14,846.0 18,797.0 4/7/2008 4/13/2008 Page 2/2 Report Printed: 5/5/2009 Security Level: Development Daily Drilling Report '"~ CD4-301 .. Report Number: 32 Rig: DOYON 19 Report Date: 1/812008 AFE Type Network/ID # Total AFE+Sup Drilling 10200417 11,750,000.00 Wellbore Well Type Field Name DFS (days) DOL Depth Progress (ft) Depth Start (ftKB) Depth End (ftKB) CD4-3016 Development NANUQ KUPARUK 30.55 32.0 0.00 14,860.0 14,860.0 Daily Mud Cost Cumulative Mud Cost Daily Cost Total Cumulative Cost 72,501.68 1,075,402.54 747,142.68 10,976,502.54 Actual Start Date Original Spud Date AFE Dur Total (days) Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 12/8/2007 12/9/2007 32.61 Last Casing String Next Casing OD (in) Next Casing Set Depth (ftKB) INTERMEDIATE, 14,855.OftK6 Ops and Depth ~ Morning Report 24hr Forecast RIH w/ TAM combo tool on 4" DP RIH w/ Combo tool -perform 2nd stage cmt job -POOH -Run kill string Last 24hr Summary Continue running 7" csg to 13,202' Circ & condition mud -Finish running 7" csg to 14,821' -PU hanger & land csg w/ shoe @ 14,855' - RD csg equipment - RU cmt equipment -Circ for cmtjob - Cmt 7" w/ 85 bblS Litecrete & 22 bbls Class G -Displace w/ 238 bbls inhibited 10.7 ppg CaCl2 & 315.4 bbls uninhibited 10.7 ppg CaCl2 -Bumped plug w/ 1500 psi - CIP @ 1615 hrs. - RD f/cmt job - LD landing jt. Set & test pack-off -Change top pipe rams f/7" to 3 1/2' x 6" VBR & test - Begin LD 5' DP General Remarks Weather Head Count -41/-61 we / SW@ 5 mph / Vis. 2 miles 47.0 Supervisor Title Dave Burley, Rig Supervisor Rig Supervisor Don Mickey, Rig Supervisor Rig Supervisor Randy Dexter, Rig Supervisor Rig Supervisor Time Lo Start End Dur Time Depth Start Depth End Time Time (hrs) Phase Op Code Activity Code P-T-x Trbl Code Trbl Class. (ftKB) (ftKB) Operation 00:00 05:15 5.25 INTRM2 CASING RNCS P 9,799.0 13,202.0 Continue running 7" 26# L-80 BTCM Casing F/9,789' T/13,202' (310 jts total) 05:15 08:00 2.75 INTRM2 CASING CIRC P 13,202.0 13,202.0 Establish circ -Stage pump up f/ 3 bbls/min to 4.2 bbls/min -circ & condition mud - ICR 650 psi FCP 650 psi - PU wt. 290 SO wt. 155 08:00 11:15 3.25 INTRM2 CASING RNCS P 13,202.0 14,855.0 Continue running 7" 26# L-80 BTCM casing f/13,202' to 14,818' (348 jts total) PU FMC fluted csg hanger & landing jt. - Land csg w! fluted hanger in wellhead w/ FS @ 14,855' - FC @ 14,766' -TAM PC @ 8289' 11:15 12:00 0.75 INTRM2 CASING RURD P 14,855.0 14,855.0 R/D tongs, slips, and Franks. R/U CMT head 12:00 15:00 3.00 INTRM2 CEMENT CIRC P 14,855.0 14,855.0 Establish circulation @ 1.5 bpm / 480 psi -Attempted to reciprocate pipe w/ 425k, unable -stage pumps up to 5.0 bpm - circulate and condition mud until mud wt. in & out @ 10.8 ppg -FCP=550 psi - Total of 984 bbls pumped -full returns throughout 15:00 15:15 0.25 INTRM2 CEMENT SFTY P 14,855.0 14,855.0 Held pre job safety & ops meeting w/ crew on cementing 7" csg Latest BOP Test Data ', Date Comment 12/29/2007 Tested Annular to 250 & 2500 is /VBR Blinds all vavles to 250 & 3500 si witnessin of test waived b AOGCC Page 1/3 Report Printed: 5/5/2009 Security Level: Development Dairy Drilling Report ~~` ~. `°f CD4-301 . . Report Number: 32 Rig: DOYON 19 Report Date: 1/8/2008 'Time Lo ', Start End Dur Time Depth Start Depth End '. Time Time (hrs) Phase Op Code Activity Code P-T-X Trbl Code Trbl Class. (ftKB) (ftKB) Operation 15:15 18:30 3.25 INTRM2 CEMENT DISP P 14,855.0 14,855.0 Perform 1st stage cement job as follows: Pump 5 bbls CW-100 -Test lines to 4400 psi - Drop bottom plug -Pump 35 bbls CW-100 @ 4 bbls/min @ 800 psi - Pump 40 bbls MudPush @ 10.5 ppg @ 4 bbls/min @ 800 psi -Mix & pump 88 bbls (148 sks) 11.0 ppg Lead slurry LiteCrete w/ .4% D046, 1 % D065, .01 6155, .25%D167) @ 5 bbls/min @ 900 psi -Mix & pump 22 bbls (107 sks) 15.8 ppg tail slurry (Class G w/ .2% D046, .25% D065, .25% D800,.18% D167) @ 3 bbls/min @ 600 psi -Drop top plug w/ 10 bbls water f/ Dowell -Switched over to rig pumps & displaced w/ 238 bbis 10.7 ppg inhibited CaCl2 @ 5 bbls/min @ 570 psi & 315.4 bbls 10.7 ppg CaCl2 @ 6 bbls/min @ 760 psi -slowed pumps to 4 bbls/min for last last 13 bbls - Bumped plug w/ 1500 psi - CIP @ 1815 hrs. -Checked floats OK -Full returns through job -Unable to move pipe during job. 18:30 19:00 0.50 INTRM2 CEMENT OTHR P 14,855.0 14,855.0 RD cement equipment 19:00 20:15 1.25 INTRM2 CASING RURD P 14,855.0 14,855.0 LD landing jt. -Pull thin wall wear bushing -Set 7" x 9 5/8" pack-off -Test to 5000 psi for 10 mins. 20:15 22:45 2.50 INTRM2 CASING OTHR P 0.0 0.0 PJSM on changing rams -Changed top pipe rams f/7" to 3 1 /2' x 6" VBR -set test plug & test to 250 & 3500 psi w/ 4" test jt. -Pull test plug -set wear bushing 22:45 00:00 1.25 INTRM2 DRILL PULD P 0.0 0.0 RU & LD 5" DP f/ driller's side of derrick via mouse hole Mud Check Data YP Calc Gel (10s) GeI (tOm) Gel (30m) HTHP Fflt Density Temp Solids, Corr. Type Depth (ftKB) Dens (Iblg ap Vis (s/qt) PV Calc (cp) (Ibf/100ft') (Ibfl100ft=) (Ibf/t00ft') (Ibf1100ft') MBT (Ib/bbl) (mLl30min) pH (°F) (%) CaCl2 10. 70 In'ection Fluid Fluid Source From Lease (bbp Destination Vendor Manifest Number Note Diesel 5.0 CD4-322 Freeze protect Drilling Mud WBM CD4-301 970.0 CD4-322 Wellbores Wellbore Name Wellbore API/UWI CD4-301 B 501032055702 Section Size (inJ Act Top (ftKB) Act Btm (ftKB) Start Date End Date PROD1 6 1!8 COND1 18 36.0 114.0 12/3/2007 12/4/2007 SURFAC 12 1 /4 114.0 3,046.0 12/9/2007 12/11 /2007 INTRM1 8 3/4 3,046.0 15,883.0 12/13/2007 12/18/2007 INTRM1 8 3/4 9,595.0 14,860.0 1/1/2008 1/5/2008 LINER B 6 1/8 14,846.0 18,797.0 4/7/2008 4/13/2008 ,Cement Production Casin Cement -Started 1/8/2008 Type Wellbore Cemented String Cement Evaluation Results casing CD4-3018 INTERMEDIATE, 14,855.OffK6 Page 2/3 Report Printed: 5/5/2009 ig: DOYON 19 Daily Drilling Report CD4-301 Security Level: Development Report Number: 32 ~ Report Date: 1/8/2008 Stg No. 1 Description Production Casing Cement Top (ftKB) 12,084.0 Bottom (ftKB) 14,855.0 Q (end) (bbl/... 4 P (final) (psi) 560.0 Fluid Class Amount (sacksi V (bbq Density (Ib/gal) Yield (ft'/sack) Est Top (ftKB) Est Btm (ftKB) Lead Cement Tail Cement LiteCrete G 148 105 85.0 22.0 11.00 15.80 3.35 1.16 12,084.0 14,355.0 14,355.0 14,855.0 Stg No. 2 Description Production Casing Cement Top (ftKB) 7,160.0 Bottom (ftKB) 8,292.0 Q (end) (bbl/... 1 P (final) (psi) 760.0 Ruld Class Amoclnt (sacks) V (bbl) Density (Ib/gal) Yield (ft'/sack) Est Top (ftKB) Est Btm (ftKB) Tail Cement G 204 42.0 15.80 1.16 7,160.0 8,289.0 Page 3/3 Report Printed: 5/5/2009 PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD4-301 Rig: Doyon 19 Date: 1/10/2008 Volume In ut Pum Rate: Drilling Supervisor: Burley 1 Mickey Pump used; Cement Unit ~ Barrels ~ 0.1000 Bbls/Strk ~ 0.8 Bbl/min ~ Type of Test: Annulus Leak Off Test for Disposal Adequacy ~ Pumping down annulus. ~ Casin Test Pressure In te ri Test Hole Size: 8-3/4" ~ Casin Shoe De th Hole De th Pum in Shut-in Pum in Shut-in RKB-CHF: 3433.0 Ft 3,036 Ft-MD 2',387 Ft-TVD 7,160 Ft-MD 3,902 Ft-TVD Bbls si Min si Bbls si Min si Casing Size and Descriution: 9-5/8" 40#/Ft L-80 BTC ~ 0 0 0 431 Chan es for Annula r Ade ua c Test Pressure Int e ri Tes t 1 0:5 110 0.25 382 outer casing shoe test results in comments Mud Weight: 10.7 ppg 2 1 135 0.5 ! 379. Description references outer casing string. Inner casing OD: 7.0 In. 3 1.5 166 1 371 ize is that drilled below outer casing. 4 2 189 1.5 36 timated TOC for Hole Depth. 5 2.5 219 2 362 Enter inner casing OD at right Desired PIT EMW: 16.0 ppg 6 3 232 2.5 362 Estimates for Test: 658 si 0.5 bbls 7 3.5 249 3 359 ~ ~ 8 4 268 3.5 -355 EMW =Leak-off Pressure + Mud Weight = 349 PIT 15 Second 9 4.5 284 4 354 0.052 x TVD 0.052 x 2387 + 10.7 Shut-in Pressure si 10 5 309 4.5 355 EMW at 3036 Ft-MD (2387 Ft-TVD) = 13.5 382 15 5.5 320 5 351 20 v 333 5 5 351 soo 25 6.5 349 . 6 350 30 7 345 6.5 345 7.5 370 7 340 8 374 7.5 .343 8.5 351 8 ...:343 9 ':370. 8.5 340 w ~ 9.5 368 9 337 ~ 10 ''' 375 9.5 3 w 10.5 388 10 33 11 405 a 11.5 41.7: 12 411!: 12.5 417! 13 426 13.5 452 14 431 0 o 5 , o , 5 z o z a ao o z a s Barrel s , s B o , z , a , s S hut- O P In tim IT P i e, M t inute s Volume Pum ed Volume Bled Back Volume Pum ed Volume Bled Back CASING TEST LEAK- OFF TEST o n 0.0 Bbls Bbls .0 Bbls Bbls Comments: 9 518" Surface casing FIT = 14.8 ppg DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071500 Well Name/No. COLVILLE RIV NAN-K CD4-301 Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20557-00-00 MD 15883 TVD 6913 REQUIRED INFORMATION Mud Log No DATA INFORMATI ON Types Electric or Other Logs Run: GR / RES Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name LIS Verification C Li 16061 I ti /R d i ti it s n uc on es s v y ED D A Di l S i sc W ona rect urvey S IQ pt L. Directional Survey Induction/Resistivity og In duction/Resistivity C ~~ i 16097 See Notes ~~ ', ,// 'ED C 16122 ~e Notes C ~ Production I, ED C Pds 16738 Production Samples No Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint Interval Log Log Run OH / Scale Media No Start Stop CH Received Comments 3009 15883 Open 3/24/2008 LIS Veri, DRHO, NPHI, RPX, PEF, NCNT, RPS, RPD, RHOS, RPM, GR, FCNT, FET, ROP 3009 15883 Open 3/24/2008 LIS Veri, DRHO, NPHI, RPX, PEF, NCNT, RPS, RPD, RHOB, RPM, GR, FCNT, FET, ROP 36 15883 Open 3/7/2008 36 15883 Open 3/7/2008 25 Col 114 15883 Open 4/10/2008 MD ROP, DGR, EWR, ALD, CTN 18-Dec-2007 25 Col 114 15883 Open 4/10/2008 TVD ROP, DGR, EWR, t ~r /~ ~ F 3 ALD, CTN 18-Dec-2007 .8 0 4/10/2008 MD and TVD EWR logs in PDF, EMF and CGM ,ty ~~~_) graphics ~ ~ 4/21/2008 MD and TVD EWR logs in PDF, EMF and CGM graphics 2 Blu 100 14385 Case 8/15/2008 PPL w/Maxtrac, Pres, Temp, Gradio, Spin, Deft 4- Aug-2008 100 14385 Case 8/15/2008 PPL w/Maxtrac, Pres, Temp, Gradio, Spin, Deft 4- Aug-2008 Well Cores/Samples Information: Name Completion Date 12/20/2007 Completion Status P&A Current Status P&A UIC N Sample Interval Set Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071500 Well Name/No. COLVILLE RIV NAN-K CD4-301 Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20557-00-00 MD 15883 TVD 6913 Completion Date 12/20/2007 Completion Status P&A Current Status P&A UIC N ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? N Chips Received? '1`tIG' Formation Tops ~ N Analysis ,LLA~ Received? Comments: Compliance Reviewed By: Date: ~ ---~-~~- - • 08/06/08 ~~~~~~ N0.4822 U Schlumberger-DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 Attn: Beth Well Job # Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 - Field: Alpine Color Log Description Date BL Prints CD Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8367. Thank you. WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. April 7, 2008 Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD4-301B AK-MW-S3 SS766 CD4-301B: 2" x S" MD TC Logs: SO-103-20SS7-02 1 Color Logs Digital Log Images: SO-103-20SS7-00,01,02 1 CD Rom This log was not in the first distribution. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99S 18 a Date: ~s~v~ - _ _~~{ ~o'a--tab i i Signed: ~l~1~2 • WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7`h Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD4-301+A+B CD4-301+A+B: 2" x 5" MD TC Logs: 50-103-20557-00,01 2" x 5" TVD TC Logs: 50-103-20557-00,01,02 Digital Log Images: 50-103-20557-00,01,02 • March 28, 2008 AK-MW-5355766 1 Color Logs 1 Color Logs 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGMNG AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: Signed: ~ - 'Li ~U~-f~~ ~ ~~~~~ ~o~ -t~c~ ~hd~~ i ConocoPhillips March 24, 2008 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Subject: Well Completion Reports for CD4-301 and CD4-301A Dear Commissioner: ~~ ~ ~ i~siC ConocoPhillips Alaska, Inc. submits the attached Well Completion Reports for the recent drilling operations on the Alpine well CD4-301 and CD4-301A. If you have any questions regarding this matter, please contact me at 265-6120. Sincerely, - ~ ~~~, G. C. Alvord Alpine Drilling Team Leader CPAI Drilling and Wells • G. C. Alvord Alpine Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6120 GCA/skad i~.i MAR 2 5 2008 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Alaska Qi1 & ~~ , ~~~ WELL COMPLETION OR RECOMPLETION REPORT ANL~,~~~o 1a. Well Status: Oil ^ Gas Plugged / Abandoned / .Suspended 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other ^ No. of Completions: 1b. Well Class: Development ^/ Exploratory ^ Service ^ Stratigraphic Test ^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., orAband.: December 20, 2007 12. Permit to Drill Number: 207-150 / 307-380 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: December 9, 2007 13. API Number: • 50-103-20557-00 4a. Location of Well (Governmental Section): Surface: 2882' FNL, 70' FEL, Sec. 24, T11N, R4E, UM 7. Date TD Reached: December 18, 2007 14. Well Name and Number: CD4-301 • Top of Productive Horizon: 568' FSL, 1160' FWL, Sec. 21, T11N, R5E, UM 8. KB (ft above MSL): ~ 36' RKB ~ Ground (ft MSL): '~55' AMSL ~, ~~; 15. Field/Pool(s): v Colville River Field Total Depth: 1192' FSL, 1109' FWL, Sec. 21, T11N, R5E, UM 9. Plug Back Depth (MD + TVD): 9817' MD / 4853' TVD Nanuq-Kuparuk Oil Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 378175. y- 5957526 ~ Zone- 4 10. Total Depth (MD + TVD): • 15883' MD / 6913' TVD ~ 16. Property Designation: ALK 380081, 380082, 380077, 384211, 372096 TPI: x- 389622 y- 5955520 Zone- 4 Total Depth: x- 389579 ~ - 5956144 • Zone- 4 11. SSSV Depth (MD + TVD): none 17. Land Use Permit: LAS2112 18. Directional Survey: Yes ^/ No ^ (Submit electronic and printed information per 20 AAC 25.050) 19. Water Depth, if Offshore: N/A (ft MSL) 20. Thickness of Permafrost (TVD): 1500' TVD ' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): top of window @ 4104 GR/RES 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM .TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 62.5# H-40 36' 114' 36' 114' 24" pre-installed 9-5/8" 40# L-80 36' 3035' 36' 2387' 12.25" 389 sx AS Lite, 259 sx Class G 23. Open to production or injection? Yes ^ No / If Yes, list each 24. TUBING RECORD Interval open (MD+TVD of Top & Bottom; Pertoration Size and Number): SIZE DEPTH SET (MD) PACKER SET none none 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED cement plug #1: 13115'-13715' 238 wx 15.9 ppg Class G cement plug #2: 9817'-10417' 293 sx Class G 26. PRODUCTION TEST Date First Production none Method of Operation (Flowing, gas lift, etc.) plugged Date of Test Hours Tested Production for Test Period --> OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing press. psi Casing Pressure Calculated 24-Hour Rate -> OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY -API (corr) 27. CORE DATA Conventional Core(s) Acquired? Yes ^ No / Sidewall Cores Acquired? Yes No / If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (Submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.07,,1// ', ~ 'r, NONE ~ fZ- ~'~~>, b ~. ~ ~ ~, Form 10-407 Revised 2/2007 ~... _ r T C~NTINU~D ON REVERSE SIDE ~5 .~('~ 3 ~, i. ~' r-~ 28. GEOLOGIC MARKERS (List all formations and ma encountered): 29. FORMATION TESTS NAME MD TVD Well tested? Yes ~ No If yes, list intervals and formations tested, Pemtafrost -Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form, if Permafrost -Bottom 1502' 1500' needed, and submit detailed test information per 20 AAC 25.071. C-30 3090' 2407' C-20 4113' 2793' K-3 6896' 3806' K-2 7664' 4082' Nanuq 13360' 6205' K-1 15040' 6816' Kuparuk C 15252' 6856' N/A Formation at total depth: Kuparuk C 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nina V~loods @ 265-6403 ~,1 C Printed Name Chi Ivord Title: Drillino Team Leader ~~~ ~ ~ ~ Date Si nature Phone ? j g ~~ ~ ~ ,~ ~ INSTRUCTIONS Sharon Allsup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a list of intervals tested and the corresponding formation, and a brief summary of this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 2/2007 .,, Naming of CD4-301, 301 A,and 301 B Rig accept 12-8-07 KOP 2: 9600' KOP 1: 10000' ~~ CD4-301 Permit #: 207-150 API: 50-103-20557-00 12-18-07 TD 15883' MD / 6913' TVD Updated 1/31/08 LCG TD of 14,860' MD / 6911' TVD 12/23/07-12/28/08 1 /1 /08-1 /5/08 CD4-301A =~ Lost BHA CD4-301 B -Suspended i; at Intrm Casing 15431' MD / 6920' TVD Permit #: 207-180. Permit #: 207-174 API: -02 API: -01 Halliburton Company Survey Report Company: ConocoPhillips Alaska Inc. Date: 2/1/2008 ..Time: 10:31:58 Pa;;c: Field: Colville River Unit Co-ordinate(NE)Reference: Well: CD4-301, True North Site: Nanuq CD4 Vertical (TVD)Re ference: CD4-301 (19+36.9) 55.9 R'ell: CD4-301 Section (VS) Reference: Well (O.OON;0'.OOE,95.98Azi) Wellpath: .CD4-301 Survey Calculation Method: Minimum Curvature Db: Oracle Field: Colville River Unit North Slope Alaska United States ~ Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate Sy stem: Well Centre ~ Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Survey 11D Incl Azim T~'D SysTVD N/S E/W iVtap~' 1VIapE Tool ft ,deg ...deg. ft ft ft ft ft ft 36.90 0.00 0.00 36.90 -19.00 0.00 0.00 5957526.12 • 378174.73 • TIE LINE 81.00 0.45 77.00 81.00 25.10 0.04 0.17 5957526.16 378174.90 CB-GYRO-SS ~ 172.00 0.78 98.00 171.99 116.09 0.03 1.13 5957526.13 378175.86 CB-GYRO-SS 262.00 1.25 111.00 261.98 206.08 -0.40 2.65 5957525.67 378177.38 CB-GYRO-SS I 353.00 2.75 122.00 352.92 297.02 -1.92 5.43 5957524.12 378180.13 CB-GYRO-SS I 444.00 5.40 128.00 443.68 387.78 -5.71 10.66 5957520.24 378185.29 CB-GYRO-SS 480.19 5.87 133.01 479.70 423.80 -8.02 13.35 5957517.88 378187.95 MWD+IFR-AK-CAZ-SC 570.30 7.85 122.53 569.16 513.26 -14.47 21.91 5957511.29 378196.40 MWD+IFR-AK-CAZ-SC 661.37 9.30 119.34 659.21 603.31 -21.42 33.57 5957504.16 378207.95 MWD+IFR-AK-CAZ-SC 751.19 9.00 109.43 747.90 692.00 -27.32 46.52 5957498.05 378220.80 MWD+IFR-AK-CAZ-SC 843.01 9.66 110.13 838.50 782.60 -32.36 60.53 5957492.79 378234.72 MWD+IFR-AK-CAZ-SC 937.81 11.79 108.61 931.64 875.74 -38.19 77.18 5957486.69 378251.27 MWD+IFR-AK-CAZ-SC 1033.16 15.30 113.10 1024.33 968.43 -46.23 97.99 5957478.31 378271.95 MWD+IFR-AK-CAZ-SC 1128.54 18.15 113.76 1115.66 1059.76 -57.16 123.17 5957466.98 378296.94 MWD+IFR-AK-CAZ-SC ~~ 1223.73 20.24 109.87 1205.56 1149.66 -68.73 152.22 5957454.94 378325.81 MWD+IFR-AK-CAZ-SC 1319.10 24.53 109.64 1293.72 1237.82 -81.00 186.40 5957442.12 378359.78 MWD+IFR-AK-CAZ-SC 1414.12 27.63 110.40 1379.06 1323.16 -95.31 225.64 5957427.17 378398.78 MWD+IFR-AK-CAZ-SC 1509.75 29.24 111.23 1463.15 1407.25 -111.50 268.20 5957410.30 378441.06 MWD+IFR-AK-CAZ-SC 1604.43 30.32 110.93 1545.32 1489.42 -128.41 312.08 5957392.68 378484.66 MWD+IFR-AK-CAZ-SC 1699.32 33.66 110.63 1625.79 I 1569.89 -146.24 359.07 5957374.10 378531.35 MWD+IFR-AK-CAZ-SC 1794.72 37.15 109.28 1703.54 1647.64 -165.07 411.02 5957354.43 378582.99 MWD+IFR-AK-CAZ-SC 1890.15 39.51 107.54 1778.40 1722.50 -183.74 467.18 5957334.85 378638.83 MWD+IFR-AK-CAZ-SC 1984.93 42.94 107.58 1849.67 1793.77 -202.58 526.72 5957315.05 378698.05 MWD+IFR-AK-CAZ-SC 2080.54 47.38 107.87 1917.07 1861.17 -223.22 591.28 5957293.37 378762.26 MWD+IFR-AK-CAZ-SC 2175.68 50.06 108.42 1979.83 1923.93 -245.49 659.21 5957270.00 378829.82 MWD+IFR-AK-CAZ-SC 2270.80 52.18 109.27 2039.54 1983.64 -269.41 729.28 5957244.95 378899.49 MWD+IFR-AK-CAZ-SC 2366.10 55.29 109.42 2095.90 2040.00 -294.87 801.77 5957218.32 378971.55 MWD+IFR-AK-CAZ-SC 2461.48 58.90 108.07 2147.71 2091.81 -320.58 877.59 5957191.39 379046.94 MWD+IFR-AK-CAZ-SC 2556.47 60.93 106.31 2195.33 2139.43 -344.85 956.11 5957165.85 379125.05 MWD+IFR-AK-CAZ-SC WeII: CD4-301 Slot Name: 50-103-20557-00 Well Position: +N/-S 0.02 ft Northing: 5957526.12 ft Latitude: 70 17 32.966 N +E/-W 0.03 ft Easting : 378174.73 ft Longitude: 150 59 10.762 W Position Uncertainty: 0.00 ft Wellpath: CD4-301 Drilled From: WeII Ref. Point 50-103-20557-00 Tie-on Depth: 36.90 ft Current Datum: CD4-301 (19+36.9) Height 55.90 ft Above System Datum: Mean Sea Level Magnetic Data: 12/9/2007 Declination: 22.32 deg Field Strength: 57567 nT Mag Dip Angle: 80.65 deg I Vertical Section: Depth From (TVD) +N/-S +E/-W Direction I ft ft ft deg 36.90 0.00 0.00 95.98 Survey Program for Definitive Wellpath Date: 2/1/2008 Validated: Yes Version: 4 Actual From To Survey Toolcode Tool Name ft ft 81.00 444.00 CD4-301 Gyro (81.00-444.00) CB-GYRO-SS Camera based gyro single shot 480.19 15855.23 CD4-301 IIFR+MS+SAG (480.19-15 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Halliburton Company Survey Report Company: ConocoPhillips Alaska Inc. Date: 2/1!2008 Timc: 10:31:58 Pa~c: 3 Field: Colville River Unit Co-ordinate(NE) Reference: Well: CD4-301, TrueNorth Site: Nanuq,CD4 Vertical (TVD) Reference: CD4-301 (19+36.9) 55.9 Wctl: CD4-301 Section (VS) Reference: Well-(O.OON,O.OOE,95.98Azi) Wellpath: CD4-301 Survey Calculation Method: Minimum Curvature Db: Oracle Su r~ cy MD Inc! Azim I'~ D Sys TVD N/S E/~V MapN A1ap1? Too- ft deg deg ft ft ft ft ft ft 2651.69 63.74 106.82 2239.53 2183.63 -368.90 1036.93 5957140.50 379205.46 MWD+IFR-AK-CAZ-SC 2746.99 67.27 107.96 2279.04 2223.14 -394.83 1119.67 5957113.24 379287.77 MWD+IFR-AK-CAZ-SC 2842.01 68.55 108.09 2314.77 2258.87 -422.07 1203.40 5957084.64 379371.03 MWD+IFR-AK-CA2-SC 2936.93 67.82 106.50 2350.05 2294.15 -448.27 1287.53 5957057.08 379454.72 MWD+IFR-AK-CAZ-SC 2997.09 68.00 107.88 2372.67 2316.77 -464.74 1340.78 5957039.75 379507.69 MWD+IFR-AK-CAZ-SC 3095.92 68.04 106.58 2409.67 2353.77 -491.89 1428.31 5957011.19 379594.76 MWD+IFR-AK-CAZ-SC 3194.19 66.81 107.24 2447.39 2391.49 -518.28 1515.13 5956983.40 379681.13 MWD+IFR-AK-CAZ-SC 3294.37 67.95 107.95 2485.92 2430.02 -546.23 1603.27 5956954.02 379768.81 MWD+IFR-AK-CAZ-SC 3389.78 68.20 108.23 2521.55 2465.65 -573.72 1687.41 5956925.18 379852.48 MWD+IFR-AK-CAZ-SC 3485.18 68.78 108.38 2556.53 2500.63 -601.59 1771.67 5956895.95 379936.27 MWD+IFR-AK-CAZ-SC 3580.43 69.20 109.26 2590.68 2534.78 -630.28 1855.83 5956865.90 380019.95 MWD+IFR-AK-CAZ-SC 3675.81 68.80 108.83 2624.86 2568.96 -659.34 1940.00 5956835.49 380103.63 MWD+IFR-AK-CAZ-SC 3770.71 68.08 109.48 2659.73 2603.83 -688.29 2023.38 5956805.18 380186.52 MWD+IFR-AK-CAZ-SC 3865.85 67.48 109.76 2695.71 2639.81 -717.87 2106.34 5956774.27 380268.98 MWD+IFR-AK-CAZ-SC 3961.04 66.80 109.88 2732.69 2676.79 -747.61 2188.85 5956743.20 380351.00 MWD+IFR-AK-CAZ-SC 4055.77 66.47 110.22 2770.26 2714.36 -777.42 2270.54 5956712.07 380432.19 MWD+IFR-AK-CAZ-SC 4150.85 67.26 110.61 2807.62 2751.72 -807.92 2352.49 5956680.25 380513.62 MWD+IFR-AK-CAZ-SC 4245.76 68.13 110.69 2843.64 2787.74 -838.89 2434.65 5956647.96 380595.27 MWD+IFR-AK-CAZ-SC 4340.81 68.53 108.76 2878.74 2822.84 -868.70 2517.80 5956616.81 380677.91 MWD+IFR-AK-CAZ-SC 4435.99 67.42 108.92 2914.43 2858.53 -897.19 2601.30 5956586.97 380760.94 MWD+IFR-AK-CAZ-SC 4530.99 68.94 106.86 2949.74 2893.84 -924.27 2685.23 5956558.54 380844.40 MWD+IFR-AK-CAZ-SC 4626.22 68.67 106.88 2984.17 2928.27 -950.04 2770.19 5956531.40 380928.93 MWD+IFR-AK-CAZ-SC 4721.33 68.73 107.29 3018.72 2962.82 -976.07 2854.90 5956504.00 381013.20 MWD+IFR-AK-CAZ-SC 4816.33 68.94 106.85 3053.02 2997.12 -1002.07 2939.58 5956476.63 381097.45 MWD+IFR-AK-CAZ-SC 4911.30 68.81 108.28 3087.25 3031.35 -1028.81 3024.04 5956448.53 381181.45 MWD+IFR-AK-CAZ-SC 5007.65 68.93 107.75 3121.98 3066.08 -1056.60 3109.50 5956419.36 381266.45 MWD+IFR-AK-CAZ-SC 5102.79 68.35 107.95 3156.64 3100.74 -1083.76 3193.84 5956390.84 381350.33 MWD+IFR-AK-CAZ-SC 5197.51 67.54 108.16 3192.20 3136.30 -1110.97 3277.31 5956362.28 381433.33 MWD+IFR-AK-CAZ-SC i 5292.94 68.41 108.69 3227.99 3172.09 -1138.93 3361.24 5956332.97 381516.79 MWD+IFR-AK-CAZ-SC 5388.21 69.85 107.88 3261.93 3206.03 -1166.86 3445.76 5956303.68 381600.84 MWD+IFR-AK-CAZ-SC 5483.58 70.90 107.60 3293.96 3238.06 -1194.23 3531.32 5956274.93 381685.94 MWD+IFR-AK-CA2-SC ~ 5578.53 70.64 107.50 3325.23 3269.33 -1221.26 3616.80 5956246.51 381770.96 MWD+IFR-AK-CAZ-SC 5673.73 69.92 108.00 3357.36 3301.46 -1248.58 3702.15 5956217.82 381855.85 MWD+IFR-AK-CAZ-SC 5769.12 69.40 108.55 3390.51 3334.61 -1276.63 3787.08 5956188.40 381940.31 MWD+IFR-AK-CAZ-SC 5864.46 69.41 108.45 3424.05 3368.15 -1304.94 3871.71 5956158.72 382024.47 MWD+IFR-AK-CAZ-SC 5959.28 68.55 107.03 3458.06 3402.16 -1331.91 3956.01 5956130.39 382108.31 MWD+IFR-AK-CAZ-SC 6054.31 68.88 106.57 3492.56 3436.66 -1357.51 4040.78 5956103.42 382192.64 MWD+IFR-AK-CAZ-SC 6149.43 69.48 107.35 3526.37 3470.47 -1383.44 4125.82 5956076.12 382277.25 MWD+IFR-AK-CAZ-SC 6244.70 69.45 108.05 3559.79 3503.89 -1410.57 4210.81 5956047.62 382361.78 MWD+IFR-AK-CAZ-SC 6340.17 69.59 108.16 3593.19 3537.29 -1438.36 4295.82 5956018.46 382446.32 MWD+IFR-AK-CAZ-SC 6435.19 68.95 107.73 3626.82 3570.92 -1465.74 4380.36 5955989.71 382530.40 MWD+IFR-AK-CAZ-SC 6530.42 67.80 109.14 3661.92 3606.02 -1493.73 4464.34 5955960.37 382613.91 MWD+IFR-AK-CAZ-SC 6625.80 66.96 109.28 3698.61 3642.71 -1522.70 4547.48 5955930.06 382696.56 MWD+IFR-AK-CAZ-SC 6720.91 66.19 109.71 3736.42 3680.52 -1551.82 4629.75 5955899.61 382778.34 MWD+IFR-AK-CAZ-SC j 6815.75 65.92 109.86 3774.91 3719.01 -1581.16 4711.31 5955868.95 382859.41 MWD+IFR-AK-CAZ-SC ~ 6910.93 67.95 110.81 3812.20 3756.30 -1611.60 4793.42 5955837.19 382941.01 MWD+IFR-AK-CAZ-SC 7006.07 69.26 111.18 3846.90 3791.00 -1643.34 4876.12 5955804.12 383023.17 MWD+IFR-AK-CAZ-SC 7101.24 68.88 106.69 3880.91 3825.01 -1672.17 4960.17 5955773.93 383106.74 MWD+IFR-AK-CAZ-SC 7196.07 69.47 106.60 3914.63 3858.73 -1697.56 5045.09 5955747.17 383191.23 MWD+IFR-AK-CAZ-SC 7291.15 68.41 106.52 3948.79 3892.89 -1722.85 5130.14 5955720.50 383275.85 MWD+IFR-AK-CAZ-SC 7386.11 69.21 107.16 3983.12 3927.22 -1748.50 5214.88 5955693.49 383360.16 MWD+IFR-AK-CAZ-SC 7481.36 69.13 104.54 4016.99 3961.09 -1772.82 5300.51 5955667.79 383445.38 MWD+IFR-AK-CAZ-SC Halliburton Company Survey Report Company: ConocoPhillips Alaska Inc. Datc: 2/1/2008 Timc: 10:31:58 Pagc: 3 Field: Colville River Unit Co-ordinate(NE)Referencec' WeIC CD4-301, True North Site: Nanuq CD4 Vertical (TVD)Referencc:' CD4-301 (19+36:9) 55.9 Well: CD4-301 Section (VS)Reference: Well (O.OON,O.OOE,95.98Azi) Wellpath: CD4-301 Survey Calculation Method: Minimum Curvature '- Db: Oracle Survev ~lD Incl Azim TVD ft deg deg ft --- ---_ 7576.34 69.07 103.34 4050.88 7671.69 69.81 104.09 4084.36 7766.87 68.88 104.13 4117.94 7862.38 68.60 106.00 4152.57 7957.80 68.48 108.54 4187.49 8053.14 69.53 109.45 4221.65 8148.73 68.68 110.66 4255.74 8243.70 69.13 111.87 4289.92 8338.95 69.99 110.65 4323.19 8434.01 72.08 110.01 4354.08 8528.38 69.80 108.42 4384.90 8624.08 68.35 108.34 4419.07 8719.33 67.61 109.01 4454.79 8815.02 67.95 110.03 4490.97 8909.68 68.01 110.14 4526.46 9005.13 68.46 110.39 4561.86 9100.35 68.61 109.99 4596.70 9195.23 68.48 109.35 4631.41 9290.27 68.49 109.25 4666.26 9385.53 69.00 108.15 4700.80 9480.98 69.85 107.93 4734.34 9575.95 69.47 107.92 4767.35 9671.15 69.19 107.36 4800.95 9766.33 69.26 107.16 4834.71 9861.28 68.80 107.42 4868.69 9956.36 68.14 107.02 4903.59 10051.94 68.61 106.55 4938.81 10146.84 68.60 106.00 4973.43 10241.62 68.62 105.99 5008.00 10336.98 67.88 105.69 5043.34 10432.05 68.73 106.15 5078.48 10527.41 68.09 106.20 5113.57 10622.58 68.40 108.89 5148.85 10717.44 68.61 109.47 5183.61 10812.52 68.59 109.68 5218.30 10907.77 68.68 108.23 5253.00 11002.91 69.34 108.41 5287.08 11097.75 68.03 108.42 5321.55 11192.93 69.66 108.73 5355.90 11288.05 68.27 108.40 5390.04 11383.52 69.14 107.84 5424.71 11478.74 68.75 107.99 5458.92 11573.88 68.29 107.67 5493.76 11669.14 68.62 107.76 5528.74 11764.10 67.41 109.11 5564.29 11859.23 67.15 110.41 5601.04 11954.11 68.02 109.39 5637.22 12049.25 68.40 108.87 5672.53 12144.41 68.46 108.49 5707.52 12239.83 68.16 106.91 5742.79 12335.04 68.09 107.36 5778.26 12429.93 68.09 107.22 5813.67 12524.93 67.47 105.97 5849.59 Sys TVD N/S ft ft E/W _ b1apY ft ft ~IapF "Cool 3994.98 -1794.19 4028.46 -1815.36 4062.04 -1837.07 4096.67 -1860.20 4131.59 -1886.56 4165.75 -1915.54 4199.84 -1946.16 4234.02 -1978.29 4267.29 -2010.65 4298.18 -2041.88 4329.00 -2071.24 4363.17 -2099.43 4398.89 -2127.70 4435.07 -2157.30 4470.56 -2187.44 4505.96 -2218.14 4540.80 -2248.72 4575.51 -2278.45 4610.36 -2307.67 4644.90 -2336.13 4678.44 -2363.81 4711.45 -2391.21 4745.05 -2418.20 4778.81 -2444.61 4812.79 -2470.96 4847.69 -2497.14 4882.91 -2522.80 4917.53 -2547.56 4952.10 -2571.88 4987.44 -2596.06 5022.58 -2620.29 5057.67 -2644.99 5092.95 -2671.63 5127.71 -2700.63 5162.40 -2730.29 5197.10 -2759.10 5231.18 -2787.02 5265.65 -2814.93 5300.00 -2843.21 5334.14 -2871.48 5368.81 -2899.14 5403.02 -2926.47 5437.86 -2953.58 5472.84 -2980.54 5508.39 -3008.38 5545.14 -3038.05 5581.32 -3067.90 5616.63 -3096.85 5651.62 -3125.19 5686.89 -3152.15 5722.36 -3178.18 5757.77 -3204.35 5793.69 -3229.47 5386.63 5955645.03 5473.36 5955622.46 5559.73 5955599.35 5645.68 5955574.83 5730.47 5955547.10 5814.63 5955516.77 5898.52 5955484.80 5981.09 5955451.33 6064.26 5955417.63 6148.56 5955385.04 6232.77 5955354.32 6317.60 5955324.77 6401.25 5955295.15 6484.74 5955264.20 6567.16 5955232.73 6650.32 5955200.69 6733.49 5955168.76 6816.64 5955137.70 6900.09 5955107.13 6984.18 5955077.31 7069.15 5955048.27 7153.87 5955019.49 7238.76 5954991.13 7323.74 5954963.36 7408.40 5954935.64 7492.88 5954908.09 7577.94 5954881.06 7662.76 5954854.93 7747.60 5954829.24 7832.80 5954803.69 7917.75 5954778.09 8002.91 5954752.01 8087.18 5954724.01 8170.54 5954693.67 8253.95 5954662.66 8337.84 5954632.50 8422.17 5954603.21 8505.99 5954573.95 8590.13 5954544.32 8674.29 5954514.70 8758.83 5954485.67 8843.38 5954456.97 8927.66 5954428.50 9012.06 5954400.18 9095.60 5954370.99 9178.18 5954339.99 9260.65 5954308.81 9344.11 5954278.52 9427.95 5954248.82 9512.41 5954220.50 9596.84 5954193.11 9680.90 5954165.58 9765.18 5954139.11 ft 383531.13 MWD+IFR-AK-CAZ-SC 383617.49 MWD+IFR-AK-CAZ-SC 383703.50 MWD+IFR-AK-CAZ-SC 383789.05 MWD+IFR-AK-CAZ-SC 383873.40 MWD+IFR-AK-CAZ-SC 383957.07 MWD+IFR-AK-CAZ-SC 384040.44 MWD+IFR-AK-CAZ-SC 384122.48 MWD+IFR-AK-CAZ-SC 384205.11 MWD+IFR-AK-CAZ-SC 384288.88 MWD+IFR-AK-CAZ-SC 384372.60 MWD+IFR-AK-CAZ-SC 384456.95 MWD+IFR-AK-CAZ-SC 384540.13 MWD+IFR-AK-CAZ-SC 384623.12 MWD+IFR-AK-CAZ-SC 384705.04 MWD+IFR-AK-CAZ-SC 384787.68 MWD+IFR-AK-CAZ-SC 384870.33 MWD+IFR-AK-CAZ-SC 384952.99 MWD+IFR-AK-CA2-SC 385035.94 MWD+IFR-AK-CAZ-SC 385119.56 MWD+IFR-AK-CAZ-SC 385204.06 MWD+IFR-AK-CAZ-SC 385288.32 MWD+IFR-AK-CAZ-SC 385372.75 MWD+IFR-AK-CAZ-SC 385457.29 MWD+IFR-AK-CAZ-SC 385541.50 MWD+IFR-AK-CAZ-SC 385625.53 MWD+IFR-AK-CAZ-SC 385710.17 MWD+IFR-AK-CAZ-SC 385794.57 MWD+IFR-AK-CAZ-SC 385878.99 MWD+IFR-AK-CAZ-SC 385963.79 MWD+IFR-AK-CAZ-SC 386048.32 MWD+IFR-AK-CAZ-SC 386133.06 MWD+IFR-AK-CAZ-SC 386216.88 MWD+IFR-AK-CAZ-SC 386299.76 MWD+IFR-AK-CAZ-SC 386382.67 MWD+IFR-AK-CAZ-SC 386466.07 MWD+IFR-AK-CAZ-SC 386549.93 MWD+IFR-AK-CAZ-SC 386633.28 MWD+IFR-AK-CAZ-SC 386716.94 MWD+IFR-AK-CAZ-SC 386800.63 MWD+IFR-AK-CAZ-SC 386884.70 MWD+IFR-AK-CAZ-SC 386968.79 MWD+IFR-AK-CAZ-SC 387052.62 MWD+IFR-AK-CAZ-SC 387136.56 MWD+IFR-AK-CAZ-SC 387219.63 MWD+IFR-AK-CAZ-SC 387301.71 MWD+IFR-AK-CAZ-SC 387383.68 MWD+IFR-AK-CAZ-SC 387466.66 MWD+IFR-AK-CAZ-SC 387550.01 MWD+IFR-AK-CAZ-SC 387634.02 MWD+IFR-AK-CAZ-SC 387718.01 MWD+IFR-AK-CAZ-SC 387801.63 MWD+IFR-AK-CAZ-SC 387885.48 MWD+IFR-AK-CAZ-SC Halliburton Company Survey Report Company: ConocoPhillips.Alaska Inc. Date: 2/1/2008''' Timc: 10:31:58 Pa~,c: 1 Field: Colville River Unit ' Co-ordinate(NE) Reference: Well: CD4-301, True North Site: Nanuq CD4 Vertical (71'D) Reference: CD4-301 (19+36.9) 55.9 Well: CD4-301 Section (VS)Re1'erenee:' Well (O.OON,O.OOE,95.98Azi) Wellpath: CD4-301 Survey Calculation Method: ' Minimum Curvatute' llb: Oracle __ _ _-- ..ftv 12618.87 12668.26 12715.53 12811.44 12905.78 13000.92 13095.83 13142.69 13190.89 13286.34 13381.99 13433.14 13476.79 13571.99 13667.37 13762.45 13809.80 13857.89 13905.93 13953.18 14048.68 14143.96 14238.60 14333.53 14382.11 14428.89 14523.87 14619.03 14714.19 14809.12 14904.28 15000.20 15095.46 15146.09 15190.32 15285.47 15381.03 15434.42 15476.25 15571.33 15625.14 15666.74 15762.00 15855.23 15883.00 Intl dey 65.31 65.32 65.26 64.85 64.71 65.28 64.15 64.03 64.30 64.22 62.87 63.62 63.75 64.10 65.05 64.96 65.52 65.81 66.34 66.36 66.41 67.03 68.23 68.56 68.36 69.15 70.69 71.88 72.99 74.73 75.11 76.19 77.96 78.66 79.85 82.03 84.14 84.77 85.08 84.96 85.82 86.07 86.38 84.83 84.83 ~~tim TVU S~~sTVD N/S E/N" deg ft ft ft ft 100.66 5887.24 5831.34 -3249.31 9848.89 98.68 5907.87 5851.97 -3256.85 9893.13 97.07 5927.63 5871.73 -3262.73 9935.66 93.87 5968.09 5912.19 -3271.02 10022.21 90.00 6008.30 5952.40 -3273.91 10107.49 86.81 6048.52 5992.62 -3271.50 10193.66 81.29 6089.08 6033.18 -3262.63 10278.97 79.22 6109.56 6053.66 -3255.50 10320.51 76.86 6130.57 6074.67 -3246.51 10362.95 72.42 6172.04 6116.14 -3223.74 10445.83 67.25 6214.67 6158.77 -3194.26 10526.18 65.86 6237.70 6181.80 -3176.08 10568.08 64.26 6257.05 6201.15 -3159.59 10603.56 61.94 6298.90 6243.00 -3120.90 10679.81 57.55 6339.87 6283.97 -3077.50 10754.18 51.21 6380.07 6324.17 -3027.35 10824.19 49.37 6399.91 6344.01 -2999.88 10857.26 46.56 6419.73 6363.83 -2970.54 10889.80 44.83 6439.21 6383.31 -2939.87 10921.22 44.50 6458.16 6402.26 -2909.09 10951.65 43.15 6496.42 6440.52 -2845.96 11012.24 39.94 6534.09 6478.19 -2780.46 11070.27 36.80 6570.11 6514.21 -2711.85 11124.58 30.67 6605.10 6549.20 -2638.49 11173.56 30.14 6622.93 6567.03 -2599.52 11196.43 30.32 6639.88 6583.98 -2561.85 11218.38 27.88 6672.50 6616.60 -2483.91 11261.75 26.99 6703.03 6647.13 -2403.92 11303.27 25.32 6731.75 6675.85 -2322.49 11343.26 20.86 6758.15 6702.25 -2238.63 11378.99 18.25 6782.91 6727.01 -2152.05 11409.74 15.54 6806.69 6750.79 -2063.14 11436.74 10.65 6828.01 6772.11 -1972.74 11457.76 8.72 6838.27 6782.37 -1923.87 11466.10 7.41 6846.51 6790.61 -1880.85 11472.19 5.70 6861.49 6805.59 -1787.51 11482.91 0.24 6873.01 6817.11 -1692.81 11487.81 358.01 6878.17 6822.27 -1639.68 11487.00 357,03 6881.87 6825.97 -1598.06 11485.20 352.14 6890.13 6834.23 -1503.79 11476.26 350.62 6894.45 6838.55 -1450.76 11468.23 349.79 6897.39 6841.49 -1409.87 11461.17 350.58 6903.67 6847.77 -1316.21 11444.96 351.31 6910.81 6854.91 -1224.41 11430.33 351.31 6913.31 6857.41 -1197.07 11426.15 MapN 11IapF. "Cool ft ft j - - _ 5954117.91 _ -- 387968.85 - - MWD+IFR-AK-CAZ-SC 5954109.66 388012.96 MWD+IFR-AK-CAZ-SC 5954103.08 388055.39 MWD+IFR-AK-CAZ-SC 5954093.39 388141.79 MWD+IFR-AK-CAZ-SC 5954089.13 388227.00 MWD+IFR-AK-CAZ-SC 5954090.14 388313.19 MWD+IFR-AK-CAZ-SC 5954097.62 388398.63 MWD+IFR-AK-CAZ-SC 5954104.08 388440.27 MWD+IFR-AK-CAZ-SC 5954112.38 388482.85 MWD+IFR-AK-CAZ-SC 5954133.80 388566.08 MWD+IFR-AK-CAZ-SC 5954161.98 388646.89 MWD+IFR-AK-CAZ-SC 5954179.47 388689.08 MWD+IFR-AK-CAZ-SC 5954195.39 388724.81 MWD+IFR-AK-CAZ-SC 5954232.83 388801.67 MWD+IFR-AK-CAZ-SC 5954275.01 388876.74 MWD+IFR-AK-CAZ-SC 5954324.02 388947.54 MWD+IFR-AK-CAZ-SC 5954350.95 388981.05 MWD+IFR-AK-CAZ-SC 5954379.75 389014.06 MWD+IFR-AK-CAZ-SC 5954409.91 389045.97 MWD+IFR-AK-CAZ-SC 5954440.19 389076.89 MWD+IFR-AK-CAZ-SC ~ 5954502.32 389138.49 MWD+IFR-AK-CAZ-SC 5954566.87 389197.57 MWD+IFR-AK-CAZ-SC 5954634.58 389252.98 MWD+IFR-AK-CAZ-SC 5954707.13 389303.14 MWD+IFR-AK-CAZ-SC 5954745.72 389326.63 MWD+IFR-AK-CAZ-SC 5954783.03 389349.19 MWD+IFR-AK-CAZ-SC 5954860.25 389393.81 MWD+IFR-AK-CAZ-SC I 5954939.55 389436.62 MWD+IFR-AK-CAZ-SC 5955020.32 389477.92 MWD+IFR-AK-CAZ-SC 5955103.58 389515.01 MWD+IFR-AK-CAZ-SC 5955189.64 389547.15 MWD+IFR-AK-CAZ-SC 5955278.09 389575.59 MWD+IFR-AK-CAZ-SC 5955368.13 389598.06 MWD+IFR-AK-CAZ-SC 5955416.86 389607.19 MWD+IFR-AK-CAZ-SC 5955459.77 389613.98 MWD+IFR-AK-CAZ-SC 5955552.92 389626.21 MWD+IFR-AK-CAZ-SC 5955647.51 389632.65 MWD+IFR-AK-CAZ-SC 5955700.65 389632.70 MWD+IFR-AK-CAZ-SC 5955742.29 389631.57 MWD+IFR-AK-CAZ-SC 5955836.69 389624.16 MWD+IFR-AK-CAZ-SC 5955889.83 389616.99 MWD+IFR-AK-CAZ-SC 5955930.83 389610.59 MWD+IFR-AK-CAZ-SC 5956024.73 389595.91 MWD+IFR-AK-CAZ-SC ! ~ 5956116.74 389582.77 MWD+IFR-AK-CAZ-SC ~ 5956144.15 389579.04 - PROJECTED to TD ! ~t~r~ocoPhillips Time Log Summary WeJJVIew Web Re~3orFrnq Well Name: CD4-301 Job Type: DRILLING ORIGINAL ~~ p~ _ Time_Logs ___ Date From To Dur S. th E. De th Phase Code Subcode T COM 12/08/2007 14:00 15:00 1.00 MIRU MOVE DMOB~ P _ Blow down steam & water lines -prep to move ri 15:00 21:30 6.50 MIRU MOVE MOB P PJSM w/ crew on moving rig -Skid floor to move position -Move pipe shed & motor/pit complexes -Move rig to CD4-301 -center rig over hole - Skid floor to drilling position -move in i e shed & motor/ it com lexes 21:30 22:30 1.00 MIRU MOVE RURD P Hook up service lines -switch to high line power Acce t ri 2230 hrs 22:30 00:00 1.50 SURFA DRILL RURD P Install surface riser 12/09/2007 00:00 01:00 1.00 SURFA DRILL RURD P Continue with surface riser installion - MU drain lines -set in mouse hole - Take on s un mud 01:00 01:30 0.50 SURFA DRILL OTHR P Move 14 stds. 4" Dp f/ ODS to DS 01:30 05:00 3.50 SURFA DRILL PULD P PU & Std back 8 std HWDP & 15 stds 5" DP 05:00 05:30 0.50 SURFA DRILL PULD P Bring BHA componets to rig floor subs, XO's & stabs 05:30 07:30 2.00 SURFA DRILL PULD P Continue picking up & std back 5" DP 28 stds total & 8" NMDC's & Jars 07:30 09:30 2.00 0 73 SURFA DRILL PULD P MU BHA #1 -bit -motor -float sub - Stab - XO -MWD - UBHO -Orient MWD to motor 09:30 10:00 0.50 73 73 SURFA DRILL SFTY P Held pre-spud & safety meeting w/ crew while down loadin MWD 10:00 10:15 0.25 73 73 SURFA DRILL OTHR P Fill hole & check for leaks -Pressure test surface lines to 3000 si 10:15 10:45 0.50 73 114 SURFA DRILL PULD P MU NM flex DC's & jars -Establish circ -wash down to btm 114' 10:45 12:00 1.25 114 170 SURFA DRILL DDRL P Spud - in @ 10:45 hrs. Drill 12 1/4" hole w/ motor f/ 114' to 170' MD 170' TVD ADT .32 hrs WOB - 10/15 RPM 40 GPM 450 @ 670 psi String wt. PU 95 SO 90 Rot 95 Tor ue on/off btm.- 4000/3000 ft/Ibs PacJo 1 of 23 n '' Time Logs _ _ ~ Date From To Dur S _ Depth E De th Phase Code Subcode T COM 12/09/2007 12:00 00:00 12.00 170 1,271 SURFA DRILL DDRL P Drill 12 1/4" hole w/ motor f/ 170' to 1271' MD, 1249 ND. ADT 7.48, ART 4.99, AST 2.49. WOB 20/30 k, RPM 60, GPM 500 @ 1300 PSI PW 124 ,SOW 124 ,Rot 124 Tor ue on/off btm. 7500/4500 ft/Ibs 12/10/2007 00:00 12:00 12.00 1,271 2,333 SURFA DRILL DDRL P Drill 12 1/4" hole w/ motor f/ 1271' to 2333' MD 2077' ND ADT - 8.67 hrs =ART - 5.58 hrs AST- 3.09 hrs. WOB 25/35 k RPM 60 GPM 625 @ 2000 psi String wt. PU 128 SO 122 Rot 126 Tor ue on/off btm,. - 8500/6500 fUlbs 12:00 00:00 12.00 2,333 2,960 SURFA DRILL DDRL P Drill 12 1/4" hole w! motor f/ 2333' to 2960' MD 2358 ND ADT - 10.10 hrs =ART- 6.56 hrs AST - 3.45 hrs. WOB 20/30K RPM 60, GPM 625 @2050 psi String wt PU 130, SO 123, Rot 130 Tot ue on/off btm 8500/6500 ft/Ibs 12/11/2007 00:00 01:00 1.00 2,960 3,046 SURFA DRILL DDRL P Drill 12 1/4" hole w/ motor f/ 2960' to .3046' MD 2391 ND ADT - 0.87 hrs =ART- 0.72 hrs AST - 0.15hrs. WOB 25/35K RPM 60, GPM 625 @2120 psi String wt PU 130, SO 123, Rot 130 Tot ue on/off btm 9500/6500 ft/Ibs 01:00 01:45 0.75 3,046 3,046 SURFA DRILL CIRC P Circulate hole clean - 625 gpm / 1835 si/60 m 01:45 05:30 3.75 3,046 890 SURFA DRILL TRIP P Perform wiper trip from 3,046' to 890' - 550gpm / 1500 psi / 60 rpm -reduced rate to 450 gpm from 1,557' - no roblems -flow check well, static 05:30 06:30 1.00 890 2,989 SURFA DRILL TRIP P RIH from 890' to 2,989' 06:30 07:30 1.00 2,989 3,046 SURFA DRILL CIRC P Precautionary wash and ream from 2,989' to 3,046' -Circulate hole clean - 600 gpm ! 1760 psi ! 60 rpm -mud wt. in & out @ 10.0 ppg -flow check well, static 07:30 09:45 2.25 3,046 890 SURFA DRILL TRIP P POOH on tt from 3,046' to 890' -hole appears in good condition -flow check well, static 09:45 12:00 2.25 890 68 SURFA DRILL TRIP P POOH -stand back hwdp - LD jars and NMDC's& UBHO sub 12:00 13:15 1.25 68 0 SURFA DRILL PULD P LD BHA components -clear tools from floor -clean ri floor 13:15 14:45 1.50 0 0 SURFA CASIN RURD P RU to run 9 5/8" casing 14:45 15:00 0.25 0 0 SURFA CASIN SFTY P Held Pre-job Safety and Opts meeting with crew Page 2 of ~3 Time Logs _ __ _ Date From To Dur 5 De th E. De th Phase Code Subcode T COM 12/11/2007 15:00 18:30 3.50 0 1,726 SURFA CASIN RNCS P Ran 9 5/8" 40# L-80 MBTC cs as follows: FS(Ray Oil Tool Ssilver bullet) 2 jts csg - FC( Halliburton Super seal) 2 jts csg - 4 jts total (made up w/ BakerLoc -fill pipe & check floats OK) Ran 41 jts 9 5/8" 40# L-80 MBTC csg 45 'ts total to 1726' 18:30 19:00 0.50 1,726 1,726 SURFA CASIN CIRC P Break circ - Circ pipe volume -ICP 350 psi @ 3.5 bbls/min - FCP 200 si 4.5 bbls/min • 19:00 20:45 1.75 1,726 3,035 SURFA CASIN RNCS P Continue running 9 5/8" 40# L-80 MBTC csg 33 jts f/ 1726' to 2996' (78 total jts ran) - PU hanger & landing jt. - Land csg w/ FMC fluted hanger on landing ring w/ FS @ 3035' - FC @ 2955' 20:45 21:00 0.25 3,035 3,035 SURFA CASIN OTHR P RD csg equipment & fill-up tool - MU cmt head & lines 21:00 22:30 1.50 3,035 3,035 SURFA CEME CIRC P Break circ -Stage pump up to 6.5 bbls/min -ICP - 210 psi @ 1 bbl/min - FCP - 260 si 6.5 bbls/min 22:30 22:45 0.25 3,035 3,035 SURFA CEME SFTY P PJSM w/ crew on cementing 22:45 00:00 1.25 3,035 3,035 SURFA CEME DISP P Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/nut plug for marker w/ rig pump -Pumped 3 bbls water w/ Dowell -Pressure test lines to 4000 psi -Dropped btm plug - Mixed & pumped 50 bbls - 10.5 ppg MudPush @ 5.6 BPM @ 445 psi - Mixed & pump Lead slurry (ArcticSet Lite 3) 10.7 ppg @ 7.5 BPM @ 700 si Pum ed 165 bbls 3,035 SURFA CEME 12/12/2007 00:00 00:45 0.75 3,035 3,035 SURFA CEME DISP P Continue pumping lead slurry (ASL) 139 bbls @ 10.7 ppg 7.3 bbls/min @ 680 psi (304 bbls total pumped) observed nut plu marker @ shakers - pumped down surge can Pumped 321 bbls total bbls of lead slur - Switched over to tail slurry .Pumped 54 bbls tail slur (Class G w/ .2% D046 +1%S2+.2%D46=.35D65)@ 15.8 ppg@4.56PM@577psi- Dropped top plug w/ 20 bbls water - Switched to rig pump & displaced w/ 204 bbls 9.8 ppg mud @ 7 BPM @ 438 to 620 psi -Slowed pump to 3.5 BPM for last 24 bbls @ 450 psi to 610 psi Bumped plug t/ 1000 psi - Checked floats OK - CIP @ 0045 hrs. - Recipocated pipe during job -full returns throughout - 125 bbls 10..7 ppg cmt returns to surface Page 3 ~t 23 Time Logs Date From To Dur 5 De th E, De th Phase Code Subcode T COM 12/12/2007 00:45 01:30 0.75 3,035 3,035 SURFA CASIN DHEO T RU and attem ted a in - change out sensor and attempt to test casing -pressure not building to sched -total of two bbls um ed 01:30 03:00 1.50 0 0 SURFA CASIN( RURD P RD Cement head, elevators, long bails - LD Landin 'oint 03:00 04:00 1.00 0 0 SURFA CASINC RURD P PJSM - RD flow line and Riser 04:00 04:45 0.75 0 0 SURFA CASIN NUND P Remove speed head from Conductor - Install FMC Wellhead -test M/M seals to 1000 psi for 10 min. -Install short bails and 5" D. P. elevators 04:45 07:00 2.25 0 0 SURFA WELCT NUND P NU BOP stack, riser and flowline - installwear bushin 07:00 07:30 0.50 0 0 SURFA DRILL OTHR P PU and spot GeoSpan skid onto rig floor 07:30 11:30 4.00 0 0 SURFA DRILL PULD P RIH picking up 5"drill pipe (90 jts) - POOH, stand back drill i e 11:30 15:00 3.50 0 0 SURFA DRILL PULD P RIH picking up 5"drill pipe (90 jts) - POOH, stand back drill i e 15:00 17:00 2.00 0 0 SURFA DRILL PULD P RIH picking up 5" drill pipe to 2850' (90 'ts 17:00 18:00 1.00 0 0 SURFA CASINC DHEO P RU and test 9 5/8" casing to 3500 ski for 30 minutes - RD and blow down lines 18:00 21:45 3.75 0 0 SURFA DRILL PULD P Continue RIH picking up & standing back 5" DP - 339 total 'nts 21:45 22:15 0.50 0 0 SURFA DRILL PULD P Pull wear bushing 22:15 00:00 1.75 0 0 SURFA WELCT BOPE P PJSM, Rig up and test BOPE Annulus - 250 low/2500 high for 5 min -test ood 12/13/2007 00:00 03:30 3.50 0 0 SURFA WELCT BOPE P Test BOP -tested pipe and blind rams, choke, kill, manifold and floor safety valves to 250/3500 psi -Pull test plug and install wear bushing - Bob Noble (AOGCC) waived witnessin tests. 03:30 05:00 1.50 0 131 SURFA DRILL PULD P MU BHA #2 -Bit -GeoPilot - nm DM flex - PWD -stab - EWR RLL -Nuke - TM HOC - FS - nmfc 05:00 05:45 0.75 131 131 SURFA DRILL OTHR T Attempt to initialize tools - communication problem -POOH to GeoPilot -repair connector GeoPilot / DM flex collar -RIH 05:45 07:00 1.25 131 131 SURFA DRILL DHEQ P Initialize tools -pressure test GeoSpan skid and lines to 3500 psi - shallow test tools 07:00 08:00 1.00 131 740 SURFA DRILL PULD P PJSM -Load source in tools - PU drlg. ~ars and RIH w/ hwd to 740' 08:00 09:00 1.00 740 1,896 SURFA DRILL TRIP P RIH with 5"drill pipe to 1896' - PU Ghost reamers 778' & 1832' 09:00 10:30 1.50 1,896 2,845 SURFA DRILL TRIP P RIH picking up 5"drill pipe from shed F/ 1896' to 2845' raga 4 of 23 ~i Time Logs Date From To Dur S. De th E. D~~th Phase Code_ Subcode T COM _ 12/13/2007 10:30 12:00 1.50 2,845 2,845 SURFA RIGMN' SVRG P Slip and Cut drilling line -Service top drive, drawworks and crown -adjust brakes on drawworks 12:00 12:30 0.50 2,845 2,955 SURFA DRILL CIRC P Wash down f/ 2845' to 2953' -Tag up on wi er lu s - 650 gpm @ 2100 psi w/ 60 m 12:30 18:15 5.75 2,955 3,066 SURFA CEME~ COCF P Drill wiper plugs -Clean out shoe tract FC @ 2955' to 2957' - cmt to 3033' - FS @ 3033' to 3035' -Clean out rat hole to 3046' Dril- 20' new hole to 3066' MD 2395' TVD WOB 8/12 RPM 90 GPM 550 @ 1550 psi ADT - .35 hrs. 18:15 18:45 0.50 3,066 3,066 SURFA CEME~ CIRC P Circ hole clean for FIT 550 gpm @ 1530 psi w/ 90 rpm Flow ck -static 18:45 19:30 0.75 3,066 3,066 SURFA CEME~ LOT P PU & attem t to perform FIT to 18.0 ppg EMW -formation went to leak-off @ 720 psi - 15.4 ppg EWM -LOT - RD 19:30 21:00 1.50 3,066 3,066 INTRM1 DRILL CIRC P Change well over f/ 9,6 ppg spud mud to 9.6 ppg LSND 550 gpm @ 1050 psi w/ 90 rpm Flow ck -static 21:00 00:00 3.00 3,066 3,320 INTRM1 DRILL DDRL P Dril18 3/4" hole w/ GP f/ 3066' to 3320' MD 2498' TVD ADT:2.65 WOB: 8/12 RPM: 120 GPM:625 @ 1450 PSI PUW: 140K, SO: 110K Tor ue onloff: 9500/8500 ft/Ibs 12/14/2007 00:00 12:00 12.00 3,320 4,712 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 3320' to 4712' MD 3015' TVD ADT:8.79 ECD - 11.21 ppg WOB: 15/20 RPM: 120 GPM:650 @ 2180 PSI PUW: 140K, SO: 120K RotWt: 130K Tor ue on/off: 9000/7000 ft/Ibs 12:00 21:00 9.00 4,712 5,648 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/GP f/ 4712' to 5648' MD 3348' TVD ADT:5.96 WOB: 15/20 RPM: 155 GPM:650 @ 2200 PSI PUW: 140K, SO: 120K RotWt: 140K Tor ue on/off: 9000/7000 ft/Ibs 21:00 21:30 0.50 5,648 5,648 INTRM1 DRILL CIRC T Circulate bottoms up due to ECD of 11.68 to 12.1 -brought ECD down to 11.1 P~~~~ a aaf 23 Time Logs Date From To Dur S. De th E. De th Ph se Code Subcode T COM 12/14/2007 21:30 00:00 2.50 5,648 5,896 INTRMI DRILL DDRL P Drill 8 3/4" hole w/GP f/ 5648' to 5896' MD 3434' TVD ADT:1.45 hrs. ECD - 11.16 ppg WOB: 15/20 RPM: 155 GPM:650 @ 2200 PSI PUW: 140K, SO: 120K RotWt: 140K Tor ue on/off: 10000/9000 ft/Ibs 12/15/2007 00:00 12:00 12.00 5,896 7,230 INTRMI DRILL DDRL P Drill 8 3/4" hole w/GP f/ 5896' to 7230' MD 3926' TVD ADT: 8.31 hrs. ECD - 11.16 ppg WOB: 18/25 RPM: 120/160 GPM:650 @ 2580 PSI PUW: 168K, SO: 130K RotWt: 147K Torque on/off: 11500/11000 ft/Ibs ECD: 11.27 12:00 21:15 9.25 7,230 8,365 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/GP f/ 7230' fo 8365' MD 4332' TVD ADT: 5.19 hrs. ECD - 10.84 ppg WOB: 18/25 RPM: 120/160 GPM:650 @ 2260 PSI PUW: 200K, SO: 135K RotWt: 160K Tor ue on/off: 14500/14000 ft/Ibs 21:15 21:45 0.50 8,365 8,365 INTRM1 RIGMN' SVRG P Service rig 21:45 00:00 2.25 8,365 8,811 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/GP f/ 8365' to 8811' MD 4490' TVD ADT: 2..15 hrs. ECD - 10.84 ppg WO B: 18/25 RPM: 120/160 GPM:650 @ 2580 PSI PUW: 200K, SO: 135K RotWt: 160K Tor ue on/off: 14500/14000 ft/Ibs 12/16/2007 00:00 12:00 12.00 8,811 10,476 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/GP f/ 8811' to 10,476' MD 5,094' TVD ADT: 8.19 hrs. ECD - 10.8 ppg WOB: 20/25 RPM: 160/170 GPM:650 @ 2230 PSf PUW: 198K, SO: 145K RotWt: 170K Tor ue on/off: 15500/14500 ft/Ibs 12:00 00:00 12.00 10,476 12,130 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/GP f! 10,476' to 12130' MD 5702' TVD ADT: 7.91 hrs. ECD - 11.01 ppg WOB: 25 RPM: 160/170 GPM:650 @ 2300 PSI PUW: 215K, SO: 145K RotWt: 178K Tor ue on/off: 16500/15500 ft/Ibs ~~iC~jL' ~i t:: <J E Time Logs _ Date From To Dur S De th E. De th Phase Code Subcode T COM 12/17/2007 00:00 12:00 12.00 12,130 13,605 INTRM1 DRILL DDRL P __ Drill 8 3/4" hole w/GP f! 12,130' to 13,605' MD 6313' TVD ADT: 8.02 hrs. ECD - 11.98 ppg WOB: 28/30 RPM: 170 GPM:650 @ 2550 PSI PUW: 265K, SO: 145K RotWt: 190K Tor ue on/off: 21500/20000 ft/Ibs 12:00 00:00 12.00 13,605 14,760 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 13,605' to14760' MD, 6745' TVD ADT: 8.18 hrs. ECD - 11.21 ppg WOB: 20/25 RPM: 160 GPM:625 @ 2800 PSI PUW: 250K, SO: 155K RotWt: 192K Tor ue on/off: 20500/19500 ft/Ibs 12/18/2007 00:00 11:15 11.25 14,760 15,883 INTRM1 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 14,760' to15,883'_MD, 6910' TVD ADT: 7.59 hrs. ECD - 11.31 ppg WOB: 28/32 RPM: 160 GPM:650 @ 3060 PSI PUW: 265K, SO: 145K RotWt: 195K Tor ue on/off: 20,000/19,000 ft/Ibs 11:15 14:45 3.50 15,883 15,502 INTRM1 DRILL CIRC P Circulate and condition mud - 650 gpm / 2950 psi / 150 rpm -increased mud wt. from 9.8 ppg to 10.0 ppg -stood back four stands to 15,502' -,slight flow on connections -well static in 10 minutes. 14:45 17:30 2.75 15,502 13,979 INTRM1 DRILL TRIP P POOH with pump from 15,502' to 13,979'. 625 GPM 120 RPM. 17:30 22:45 5.25 13,979 8,174 INTRM1 DRILL TRIP P POOH on trip tank from 13,979' to 8,174'. Hole ti ht. 50 K ove ull. 22:45 00:00 1.25 8,174 7,698 INTRM1 DRILL TRIP P POOH with pump from 8,174' to 7,698'. 550 GPM 120 RPM. 12/19/2007 00:00 01:30 1.50 7,698 6,937 INTRM1 DRILL TRIP P POOH with pump from 7,698' to 7,603' - 3 bpm / 450 psi -POOH on TT from 7603' to 7508' wiped through tight spots -POOH with pumps from 7,508' to 6,937' - 550 gpm / 1750 psi / 100 rpm -Blow down top drive -flow check well, static 01:30 06:00 4.50 6,937 3,036 INTRM1 DRILL TRIP P POOH on TT from 6,937' to 3,036 - worked through tight spot at 5220' - flow check well, static 06:00 07:45 1.75 3,036 2,465 INTRM1 DRILL TRIP P POOH from 3,036'- swabbing well - Pump out from 3036' to 2,465'- 650 gpm / 1100 psi / 120 rpm -monitor well - sli ht flow static in 8 minutes 07:45 10:15 2.50 2,465 743 INTRM1 DRILL TRIP P POOH on TT from 2,465' to 743' -hole taking proper fill -flow check well, static 10:15 12:00 1.75 743 103 INTRM1 DRILL TRIP P POOH from 743' to 103' -Stand back hwdp -recover corrosion ring - PJSM on nukes -Stand back nmfc's - remove source from nuke tool Page 7 of 23 Time Logs Date From To Dur S. Depth E. De th Phase Code Subcode T COM 12/19/2007 12:00 14:45 2.75 103 0 INTRM1 DRILL PULD P PU to GeoPilot -down load tools - service GeoPilpot - LD fs -nuke collar - bit - EWR RLL -stab - PWD - DM and GeoPilot -Clear tools from rig floor 14:45 17:15 2.50 0 936 INTRM1 CEME TRIP P PJSM - RU to run tubing _ MU mule shoe and pick up 30 joints of 3 1/2" tubin w/ XO's to 4 1/2" IF 17:15 20:00 2.75 936 7,117 INTRM1 CEME TRIP P RIH from 936' to 7,117'. 20:00 21:00 1.00 7,117 7,117 INTRMI CEME CIRC P Circulated to clear tubing. Thawed Grabber on To Drive. 21:00 23:15 2.25 7,117 10,923 INTRM1 CEME TRIP P RIH from 7,117' to 10,923'. 23:15 00:00 0.75 10,923 10,993 INTRM1 CEME CIRC P Broke circulation and thawed Top Drive. Tem -42. 12/20/2007 00:00 01:45 1.75 10,993 14,065 INTRM1 CEME TRIP P RIH from 10,993' to 14,065' PUW 230K SOW 150K 01:45 02:15 0.50 14,065 14,065 INTRM1 RIGMN OTHR T Service top drive grabs -weather related problem -42 degrees ambient tem . 02:15 04:00 1.75 14,065 14,065 INTRMI CEME CIRC P Circulate and condition mud for cementing 500 gpm / 1950 psi -PUW 235K SOW 145K - FCP=1840 psi - mud wt. 10.2 04:00 04:30 0.50 14,065 14,065 INTRM1 CEME CIRC P Pum 35 bbls hi h el pill.- displace to equalization - 14 bpm / 2350 psi - B-ow down lines -Flow check well, Static. 04:30 05:00 0.50 14,065 13,715 INTRM1 CEME TRIP P POOH to 13,715' - RU cement lines 05:00 06:00 1.00 13,715 13,715 INTRM1 CEME PLUG P PJSM -establish circulation with Dowell pump -test lines to 3000 psi - Plugged back 8 3/4" open hole from 13,715' with 238 sxs of 15.9 ppg G cement (15% excess) 1.21 cf/sx yld - displaced to equalization -CIP @ 0600 hrs - ETOC 13,115' 06:00 07:00 1.00 13,715 12,732 INTRM1 CEME TRIP P RD cement lines -POOH to 12.732' PUW 225K SOW 145 -flow check well, static 07:00 07:15 0.25 12,732 12,732 INTRM1 CEME CIRC P RU circ head and line -Circulated 80 bbls of mud to clear tubing - 10 bpm /1310 si - RD & blow down lines 07:15 08:45 1.50 12,732 10,734 INTRM1 CEMEt, TRIP P OOH from 12,732' to 10,734' PUW 190K SOW 135K 08:45 09:15 0.50 10,734 10,734 INTRM1 CEME CIRC P RU and establish circulation - pum e{'L_ 35 bbls hi h el ill -displaced to equalization - 12 bpm / 1650 psi - RD & blow down lines 09:15 09:30 0.25 10,734 10,417 INTRM1 CEME TRIP P POOH from 10,734' to 10,417' 09:30 10:30 1.00 10,417 10,417 INTRM1 CEME PLUG P With tubing tail @ 10,417': plugged back 8 3/4" open hole with 293 sxs of G cement 1 cf/sx Id -displaced to equalization with 10.2 ppg mud -CIP 1025 hrs. ETOC 9817' Paga 8 of 23 ~~ Time Logs _ ~ Date From To Dur S. D th E. De th Ph e Code Subcode T COM 12/20/2007 10:30 11:30 1.00 10,417 9,815 INTRM1 CEME TRIP P _ RD lines -POOH from 10,417' to 9815' - RU circulatin head in and hose 11:30 13:15 .1.75 9,815 9,815 INTRMI CEME CIRC P Circulate and condition mud - 12 bpm / 1600 psi -observed water ahead of lu back to shakers -dumped 125 bbls of high PH mud -flow check well, static 13:15 18:45 5.50 9,815 3,025 INTRM1 CEME TRIP P POOH from 9,815' to 3,025' on TT. Held Safe Stand down with crew. 18:45 20:30 1.75 3,025 3,025 INTRM1 RIGMN' SVRG P Installed bell guide on topdrive. Sli ed and cut drillin line. 20:30 21:00 0.50 3,025 3,025 INTRM1 DRILL SFTY P Stopped work and had Safety Stand Down with Ni ht Crews. 21:00 22:15 1.25 3,025 937 INTRM1 CEME TRIP P POOH from 3,025' to 937` on TT. 22:15 00:00 1.75 937 400 INTRM1 CEME PULD P Rigged up and POOH 3.5" cement strin la in down to 400'. 12/21/2007 00:00 01:15 1.25 400 0 INTRM1 CEME PULD P Laid down 3.5" tubing. 01:15 02:30 1.25 0 90 INTRM1 DRILL PULD P Picked up and made up Drilling BHA. Could not u load Nuke tool. 02:30 05:30 3.00 90 0 INTRM2 DRILL PULD T Trouble shoot nuke tool. Pumped through tool while warming up with steam. -46 Tem . 05:30 07:30 2.00 0 735 INTRM2 DRILL PULD P Uploaded tools and loaded nukes. RIH W BHA. 07:30 08:30 1.00 735 1,901 INTRM2 DRILL TRIP P RIH to 1,901' and tested tools OK. 08:30 13:30 5.00 1,901 9,415 INTRM2 DRILL TRIP P RIH from 1,901'to 9,415' filling every 20 stands. 13:30 14:45 1.25 9,415 9,842 INTRM2 DRILL REAM P Washed and reamed from 9,415' to TOC 9 842'. 14:45 15:30 0.75 9,842 9,912 INTRM2 DRILL KOST P Dressed cement to 9,912' and Kicked off well. KOP 9,912'. 15:30 00:00 8.50 9,912 10,841 INTRM2 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 9,912' to10,841' MD, 5292' TVD ADT: 5.1 hrs. ECD - 10.84 ppg y ~ , WOB: 25/28 RPM: 170 GPM:650 @ 2380 PSI PUW: 230 K, SO: 140 K RotWt: 175 ff~~ ~v _. "` K Tor ue on/off: 17,500/16,500 ft/Ibs 12/22/2007 00:00 12:00 12.00 10,841 12,093 INTRM2 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 10,841' to 12,093' MD, 5892' TVD ADT: 7.41 hrs. ECD - 10.76 ppg WOB: 25/28 RPM: 160 GPM:650 @ 2430 PSI PUW: 264 K, SO: 149 K RotWt: 186 K Tor ue on/off: 20,000/19,000 ft/Ibs laage 8 of 23 Time Logs Date From 7o Dur S. De th E. De th Ph e Code Subcode T COM 12/22/2007 12:00 00:00 12.00 12,093 13,515 INTRM2 DRILL DDRL P __ Drill 8 3/4" hole w/ GP f/ 12,093' to 13,515' MD, 6,462' TVD ADT: 7.79 hrs. ECD - 10.82 ppg WOB: 25/28 RPM: 160 GPM:650 @ 2640 PSI PUW: 265 K, SO: 150 K RotWt: 195 K Tor ue on/off: 21,000120,000 ft/Ibs 12/23/2007 00:00 12:00 12.00 13,515 14,682 INTRM2 DRILL DDRL P Drill 8 3/4" hole w/ GP f/ 13,515' MDto 14,682 6,850' TVD ADT: 8.11 hrs. ECD - 11.21 ppg WOB: 25/30 RPM: 160 GPM:650 @ 2980 PSI PUW: 267 K, SO: 149 K RotWt: 196 K Tor ue on/off: 19,500/18,000 ft/Ibs 12:00 18:00 6.00 14,682 15,431 INTRM2 DRILL DDRL P Drill 8 3/4" hole w! GP f/ 14,682' MDto 15,431 6,919' TVD ADT: 5.5 hrs. ECD - 11.2 ppg WOB: 25 RPM: 160 GPM:650 @ 3,010 PSI PUW: 267 K, SO: 145 K RotWt: 196 K Tor ue on/off: 21,000/20,000 ft/Ibs 18:00 18:45 0.75 15,431 15,431 INTRM2 WELC KLWL T Driller noted increase in flow and , flocheck indicated well was flowing. Shut in well and monitered pressures. Pit gain 9 Bbls. There was 100 Bbls of 10 PPG mud in DP. Stabilized pressure after 15 min. SIDPP 40 psi, SICPP 40 psi. Started pumping with 10.0 PPG mud @ 40 SPM maintaing 40 psi on choke. ICP 537 psi. Pressure was increasing to 530 psi with 30 SPM. DP pressure continued to increase indicating well packed off. Attempted to move DP through bag did no elk loose. SICP 0 si.. 18:45 00:00 5.25 15,431 15,330 INTRM2 DRILL REAM T Opened Bag well dead. Started working Packed off DP to establish circulation. Worked pipe from 15,431 to 15,409' and stood back stand. Continued to work i e with rotation ~No Circulation) from 15,409' to 15,330'. Notified AOGCC state re resentatives b hone 2200 hrs. 12/24/2007 00:00 11:00 11.00 15,330 15,323 INTRM2 DRILL REAM T Worked packedoff pipe using rotary from 15330' to 15,323' no more progress. Worked pipe without upward progress. Pulling to 410 k. No jar action. 11:00 11:30 0.50 15,323 15,323 INTRM2 DRILL CIRC T Attempted to establish circulation 10 SPM 1350 si. No success. F'~ge 10 ~rf ~3 ~~ Time Logs OM __ i Da e From To Dur S. De th E De th Pha e Code Subcode T C 12/24/2007 11:30 20:00 8.50 15,323 15,307 INTRM2 DRILL OTHR T _ Worked packedoff pipe from 15323' to 15 307' (@370 k) no more progress. Worked pipe without upward progress. Pulling to 430 k. No jar action or rotation. 20:00 00:00 4.00 15,307 15,323 INTRM2 DRILL RURD T Ri ed u Schlumber er pressure Equipment and hung WL sheave. Making up backoff charge. Monitoring well flowin throu h DP. 12/25/2007 00:00 00:45 0.75 15,323 15,323 INTRM2 DRILL RURD T Continue RU Schlumberger. Monitor volume of back flow from DP. Gained 36 bbls. SIDPP - 380 si. 00:45 01:45 1.00 15,323 15,323 INTRM2 WELCT CIRC T Bullhead 37 bbls 10.5 mud at 2 bpm. Chase with 10 bbls 10.2 mud. Bleed off pressure. Close bleeder. SIDPP - 380 si.. 01:45 02:45 1.00 15,323 15,323 INTRM2 FISH ELNE T Schlumberger RIH w/ string shot. Monitor flow back. 28 bph. Stop Schlumber er. SIDDP - 320 si. 02:45 03:15 0.50 15,323 15,323 INTRM2 WELC CIRC T Line up and bullhead 37 bbls 10.7 mud followed by 10 bbls 10.2 mud. Bleed off ressure. 03:15 04:15 1.00 15,323 15,323 INTRM2 FISH ELNE T Schlumberger continued in hole with string shot. Back flowed 23 bbls in 1 hour. Stop eline at 6900'. SIDPP - 280 si. 04:15 06:45 2.50 15,323 15,323 INTRM2 WELCT OTHR T Line up and bullhead 224 bbls 10.3 PPG mud followed by 37 bbls 11 PPG mud. Then 30 Bbls of 10.3 PPG Mud. ICP 1740 psi final 1540 psi. Pumped 2 BPM. 06:45 08:45 2.00 15,323 15,323 INTRM2 WELCT OWFF T Bled back 9 Bbls. Well. Closed choke to observe pressure. Observed well for 1 hour. Well dead 08:45 11:45 3.00 15,323 15,323 INTRM2 FISH ELNE T Opened Packoff and RIH with back off shot to 7,300' Could not o down. 11:45 13:45 2.00 15,323 15,323 INTRM2 FISH ELNE T POOH with Schlumberger tools and rearran a swivel. 13:45 17:00 3.25 15,323 15,323 INTRM2 FISH RURD T Changed packoff to grease head and installed side ent sub. 17:00 00:00 7.00 15,323 15,323 INTRM2 FISH ELNE T RIH with Schlumberger back off shot to 13,475' Pumping in as needed to move tool. Tool stuck @ 13,475'. Worked pipe and surged pipe attem tin to free strin shot. 12/26/2007 00:00 01:15 1.25 15,323 15,323 INTRM2 FISH ELNE T Work pipe up and down while applying torque to free eline tools. Put in 10 rounds left hand for ue. 14k ft lbs. 01:15 02:00 0.75 15,323 15,323 INTRM2 FISH ELNE T Pump 2 bpm at 1610 psi for Schlumberger to place string shot on de th at 13,414'. 02:00 02:45 0.75 15,323 15,323 INTRM2 FISH ELNE T Place 4 strand string shot across tool joint at 13,445'. Had indication of at surface.. No change in string weight or torque. Worked pipe with left hand torque. Pi a did not back off. f'~~~ ~11 cf 23 Time Logs Date From Ta Dur 5 De th E. Depth Phase Code Subcode T COM 12/26/2007 02:45 03:45 1.00 15,323 15,323 INTRM2 FISH ELNE T POH with a-line to 300'. 03:45 05:30 1.75 15,323 15,323 INTRM2 FISH ELNE T Set slips. Break out pup below y-swivel. LD tools. Monitor well whole re-head and re-dress string shot w/ 6 strands of rimer cord. 05:30 06:15 0.75 15,323 15,323 INTRM2 FISH ELNE T Start string shot assembly in hole. MU -swivel assembl . 06:15 08:45 2.50 15,323 15,323 INTRM2 FISH ELNE T RIH w/ string shot to 13,500'. Starting bullheading 1.5 bpm at 4700' and increased to 2 b mat 10,000'. 08:45 10:45 2.00 15,323 15,323 INTRM2 FISH ELNE T Worked 8 rounds left hand torque into string. Connection below y-swivel broke. Apply 15 rounds right hand torque to string. Got 14 rounds back. Work 9 rounds left hand torque into strin .Tor ue - 16k ft Ilbs. 10:45 11:15 0.50 15,323 15,323 INTRM2 FISH ELNE T Place string shot across tool joint at 3,414'. (2 jts above top ghost reamer). Fired shot. No indication that shot fired at surface. No change in string weight or torque. Back out left hand for ue. 11:15 14:15 3.00 15,323 15,323 INTRM2 FISH ELNE T POH with a-line tools. 14:15 21:00 6.75 15,323 15,323 INTRM2 FISH ELNE T Rigged down String Shot tools Shot Rigged up to run Freepoint on "Bi "line. 21:00 00:00 3.00 15,323 15,323 INTRM2 FISH ELNE T PJSM. Rigged up Schlumberger and attempted to RIH. Cable was bad. Laid down tools and cut 300' of bad cable. 12/27/2007 00:00 00:30 0.50 15,323 15,323 INTRM2 FISH ELNE T Schlumberger. Re-headed rope socket. 00:30 01:45 1.25 15,323 15,323 INTRM2 FISH ELNE T MU Y-Block assembly. RIH with free oint tool to 2000'. 01:45 03:30 1.75 15,323 15,323 INTRM2 FISH ELNE T Calibrate free point tool in free pipe. 03:30 05:45 2.25 15,323 15,323 INTRM2 FISH ELNE T RIH to 3500'. Start bull heading ?bpm. Continue RIH to 6840'. Grease head was leaking. Change to heavier grease. Grease head still leaking. Concerned about possible head washout. 05:45 06:45 1.00 15,323 15,323 INTRM2 FISH ELNE T Obtain free point at 6840' to check tool. 06:45 08:00 1.25 15,323 15,323 INTRM2 FISH ELNE T POH with free point tool to 300'. 08:00 09:00 1.00 15,323 15,323 INTRM2 FISH ELNE T Break off Y-Block assembly. LD tools. RD .39 WL sheaves. 09:00 12:00 3.00 15,323 15,323 INTRM2 FISH ELNE T RU .23 WL for pert gun run. Re-head same. Page 12 of 23 l Time Logs Date From To Dur S. De th E. De th Ph se Code Subcode T COM 12/27/2007 12:00 16:30 4.50 15,323 15,323 INTRM2 FISH ELNE T Picked up tools and RIH with pert gun 1 5/16" gun 2' Loaded 5 shots first foot 4 shots second foot for a total of 9 ~~ i Q~ W ~~ shots in 2' to 13,428'. Assisted with pump from 5,400' to 13,428' Pumped 193 Bbls 10.5 PPG mud to formation. Fired gun and perforated from 13,428' to 13,430'. Had 400 si on DP which went to 20 si at shot. 16:30 18:15 1.75 15,323 15,323 INTRM2 FISH ELNE T POOH with Slumberger tools. Laid down tools. 18:15 22:45 4.50 15,323 15,323 INTRM2 FISH CIRC T Checked well no flow or pressure. Broke circulation and circulated staging pumps up to final rate of 4.5 BPM. Monitored returns for rate and MW. Circulated through open choke for precaution. MW 10.5 in and out. Shut down pumps and observed well for flow then checked for pressure. Well dead. 22:45 00:00 1.25 15,323 15,323 INTRM2 FISH ELNE T Picked up Rackoff shot and RIH with Schlumberger to 8,000'. Circulated 2 BPM from 3,700' to help tool down hole. 12/28/2007 00:00 02:00 2.00 15,323 15,323 INTRM2 FISH ELNE T Continue RIH with string shot while circulating at 2.5 bpm - 410 psi. Tools sto ed at erforations at 13,428'. Close annular. Bullhead 28 bbls at 1.5 b m - 610 si.. Bleed off ressure. 02:00 03:30 1.50 15,323 15,323 INTRM2 FISH ELNE T Put 15 rounds right hand torque in drill pipe. Work in 18K ft Ibis left hand for ue and hold with ri ton s. 03:30 04:30 1.00 15,323 15,323 INTRM2 FISH ELNE T Place string shot accross tool joint at 13,345'. Fire string shot. No surface indication of firing. Pull tools up hole 300'. Reciprocate nine while holding left hand for ue. No se eration. 04:30 05:30 1.00 15,323 15,323 INTRM2 FISH ELNE T POH with tools to 300'. 05:30 06:00 0.50 15,323 15,323 INTRM2 FISH ELNE T Break out Y-Block assembly. LD tools. Strin shot fire 06:00 07:00 1.00 15,323 15,323 INTRM2 FISH ELNE T Schlumberger made up and checked 1 7/8" collision tool strin . 07:00 07:30 0.50 15,323 15,323 INTRM2 FISH ELNE T PU collision tool. Make up Y-Block assembl . 07:30 08:45 1.25 15,323 15,323 INTRM2 FISH ELNE T RIH with tools while circulating at 3 b mat 480 si. 08:45 11:00. 2.25 15,323 15,323 INTRM2 FISH ELNE T Correlate tools to tool jt at 13,445'. Check line several times for tool movement after line is stopped. Estimate 2' of over travel. Fire collision tool with 3 in wt. No chan a in wt. 11:00 16:15 5.25 15,323 15,323 INTRM2 FISH ELNE T POOH with Schlumberger tools and laid down same. Laid down Y block lubracator. Page 1 ~ of 23 Time Logs ___._ ____ _ Date Fram Ta Dur S. De th E. De th Phase Code Subcode T COM 12/28/2007 16:15 18:15 2.00 15,323 15,323 INTRM2 FISH CIRC T _ Circulating @ 10 BPM working stuck i e. 18:15 19:30 1.25 15,323 15,445 INTRM2 FISH CIRC T Pi a cam free. Circulate and condition mud 10 BPM. 19:30 21:45 2.25 15,445 11,478 INTRM2 FISH TRIP T POOH from 13,445' to 11,478' on TT Wi er Tri .Observed well, static. 21:45 22:45 1.00 11,478 13,435 INTRM2 FISH TRIP T RIH from 11,478' to 13,435'. 22:45 00:00 1.25 13,435 13,435 INTRM2 FISH CIRC T Circulated and raised MW to 10.8 PPG. 10 BPM 50 RPM 920 si. 12/29/2007 00:00 01:15 1.25 13,435 13,435 INTRM2 FISH CIRC T Continue to circulate at 10 bpm - 920 psi. Increase mud weight to 10.8. Flow check well. Static. Pump Brie job. Blow down to drive. 01:15 01:45 0.50 13,435 13,037 INTRM2 FISH TRIP T POH on trip tank from 13,435' to 13,037'. Im ro er hole fill. 01:45 02:15 0.50 13,037 13,435 INTRM2 FISH TRIP T RIH to 13,385'. Wash to 13,435'. 02:15 03:45 1.50 13,435 13,435 INTRM2 FISH CIRC T CBU plus 60 bbls 10-12 bpm at 920 - 1180 si. No influx. 03:45 06:15 2.50 13,435 11,479 INTRM2 FISH TRIP T POOH on trip tank from 13,435' to 11,479'. 06:15 13:30 7.25 11,479 2,917 INTRM2 DRILL TRIP T Pumped slug and continue POOH on TT from 11,479' to 2,917'. 13:30 14:00 0.50 2,917 2,917 INTRM2 WELCT OWFF T Observed well. No flow. 14:00 16:00 2.00 2,917 0 INTRM2 FISH TRIP T POOH on TT from 2,917' to surface and laid down cut off stub.. Severed about 3' above Tool 'oint. 16:00 17:15 1.25 0 0 INTRM2 DRILL PULD T Moved HWDP in derrick. 17:15 23:30 6.25 0 0 INTRM2 WELCT BOPE T Pulled wear ring. PJSM, Rig up and test BOPE Annulur - 250 low/2500 high Rams and valves 250/3500 for 5 min -test good. Tested closing unit OK. 23:30 00:00 0.50 0 0 INTRM2 CEME RURD T Rigged up to pick up tubing tail. 12/30/2007 00:00 00:15 0.25 0 0 INTRM2 CEME CIRC T PJSM on picking up 3?" tbg. 00:15 02:15 2.00 0 928 INTRM2 CEME TRIP T PU and RIH w/ 30 jts 3?" tbg to 928'. 02:15 02:45 0.50 928 928 INTRM2 CEME RURD T Change elevators. Make up XO's. 02:45 10:30 7.75 928 13,398 INTRM2 CEME TRIP T RIH with 5" DP from 928; to 13,398'. Break circulation every 20 stds to clear i e. 10:30 13:00 2.50 13,398 13,430 INTRM2 CEME CIRC T Break circulation. Wash from 13,398' to 13 430'. Circulate and condition mud at 12 b m - 1260 si. P~~~ 14 e~f 23 l I Time Logs --- Date From To Dur S. De th E. Depth Phase Gode Subcode T COM _ 12/30/2007 13:00 14:00 1.00 13,430 13,430 INTRM2 CEME DISP T PJSM -establish circulation with ~, ~ '~ V.LtL- `` ~`1't' `~~~ S5C rL` V Dowell pump -test lines to 3000 psi - Plugged back 8 3!4" open hole from ~~ ~ O ~ ~- M c~'n~ ~ 3 ' ~ ` 13,430' to 12,830' with 304 sxs 54 Bbls of 17 ppg G cement (20% ~' i Y~ GS c vL` C` ~,J ,~~f yr~'" ( excess) 1 cf/sx yld -displaced to equalization - CIP @ 1400 hrs - ETOC r 12,830'. 14:00 15:00 1.00 13,430 12,446 INTRM2 CEME TRIP T POOH from 13,440' to 12,446' on TT. 15:00 16:30 1.50 12,446 12,446 INTRM2 CEME CIRC T Circulate and conditioned mud 14 BPM 1480 si. 16:30 18:00 1.50 12,446 10,543 INTRM2 CEME TRIP T Flow checked well Static. POOH on TT from 12,446' to 10,543'. 18:00 22:00 4.00 10,543 10,543 INTRM2 CEME WOC T WOC until 2200 hrs. Circulating 5 BPM 340 si. 22:00 23:15 1.25 10,543 12,680 INTRM2 CEME TRIP T RIH fr m 10,543' to 12,702'. Tagged cement. 23:15 23:30 0.25 12,680 12,702 INTRM2 CEME OTHR T Broke circulation and retagged TOC @ 12,702' with 15K. Tag witnessed by tate Re resentative Bob 23:30 00:00 0.50 12,702 12,446 INTRM2 CEME TRIP T Picked up to 12,636' and blew down to drive. POOH on TT to 12,446'. 12/31/2007 00:00 01:45 1.75 12,446 10,194 INTRM2 CEME TRIP T POH on trip tank from 12,636' to s 10 194'. 01:45 02:15 0.50 70,194 10,194 INTRM2 CEME CIRC T Spot 40 bbl hi-vis pill at 10 bpm - 760 si. 02:15 02:30 0.25 10,194 10,004 INTRM2 CEME TRIP T POH from 10,194' to 10,004'. 02:30 03:00 0.50 10,004 10,004 INTRM2 CEME CIRC T MU head pin. Establish circulation at 10 b m - 1060 si. 03:00 03:45 0.75 10,004 10,004 INTRM2 CEME DISP T PJSM -establish circulation with Dowell pump -test lines to 3000 psi - Plugged back 8 3/4" open hole from 10,004' to 9404' with 304 sxs 54 Bbls of 17 ppg G cement (20% excess) 1 ft?/sk yld -displaced to equalization - CIP 0332 hrs - ETOC 9404'. 03:45 04:45 1.00 10,004 9,021 INTRM2 CEME TRIP T POH slow from 10,004' to,9021'. 04:45 06:15 1.50 9,021 9,021 INTRM2 CEME CIRC T CBU at 12 bpm. Smalll~ amount cement contaminat 06:15 10:30 4.25 9,021 2,836 INTRM2 CEME TRIP T POH on trip tank from 9121' to 8070'. Pump dry job. Blow down. POH to 2836. No hole roblems. 10:30 10:45 0.25 2,836 2,836 INTRM2 RIGMN SFTY P PJSM on slip and cut drilling line. 10:45 12:15 1.50 2,836 2,836 INTRM2 RIGMN SVRG P Slip and cut drilling line. Service top drive. 12:15 13:15 1.00 2,836 938 INTRM2 CEME TRIP T POH with 5" DP from 2836' to 938'. 13:15 16:30 3.25 938 0 INTRM2 CEME PULD T PJSM and laid down 30 jts 3.5" tubing and muleshoe. 16:30 18:45 2.25 0 266 INTRM2 DRILL PULD T Picked up Geopilot BHA and RIH to 266'. Shallow tested. i~3L~$ 't3 A'f ~~ ~,,~LI l r Time Logs _ ~ Date From To Dur S De th E. De th Phase Code Subcode T COM 12/31/2007 18:45 20:15 1.50 266 2,719 INTRM2 DRILL TRIP T RIH with HWDP and stands to 2,719'. 20:15 21:30 1.25 2,719 2,719 INTRM2 DRILL SRVY T Filled pipe and tested tools. No signal to geopilot. Trouble shoot tools. Tools OK. 21:30 22:45 1.25 2,719 4,465 INTRM2 DRILL TRIP T RIH from 2,719' to 4,465' string taking wei ht. 22:45 00:00 1.25 4,465 4,908 INTRM2 DRILL REAM T Washed and reamed from 4,465' to 4,908'. 100 r m 550 m 1680 si. 01/01/2008 00:00 08:00 8.00 4,908 9,571 INTRM2 DRILL REAM T Wash and ream several sections from 4908' to 9571' 550 m - 100 rpms. No firm cement encountered. 08:00 12:00 4.00 9,571 9,629 INTRM2 STK KOST T Control drill and attempt to sidetrack well from 9571' to 9629'. TVD - 4786'. RPM = 100 WOB = 3k/7k 605 gpm @ 2420 psi ECD = 11.46 12:00 23:15 11.25 9,629 10,618 INTRM2 DRILL DDRL T Drill 8 3/4" w/ GP f/ 9629' to 10,618' MD 5235' TVD ADT - 7.92 hrs ECD - 11.8 ppg ~~ ~ WOB - 18/22 k RPM 150 GPM 650 @ 2770 psi ~~~ , ~ String wt. PU 228 SO 137 Rot 170 Torque on/off btm. -17,000/15,500 ft/Ibs 23:15 00:00 0.75 10,618 10,618 INTRM2 RIGMN RGRP T Blow Down TD - RU head pinto circ - Chan a swivel ackin 01/02/2008 00:00 00:30 0.50 10,618 10,618 INTRM2 RIGMN RGRP T Change out and grease wash pipe packing while circulating at 5 bpm - 520 psi. RD head pin. Bring pumps up to s eed to check for leaks. 00:30 12:00 11.50 10,618 11,760 INTRM2 DRILL DDRL T Drill 8 3/4" w/ GP f/10,618' to 11,760' MD 5824' TVD ADT - 6.85 hrs ECD - 11.8 ppg WOB - 18/22 k RPM 150 655 gpm @ 2970 String wt. PU 175 SO 142 Rot 186 Torque on/off btm. - 19,500/19,500 ft/Ibs Observed sli ht flow on connections 12:00 00:00 12.00 11,760 12,997 INTRM2 DRILL DDRL T Drill 8 3/4" hole w/ GP f/ 11,760' to 12,997' MD 6377' TVD ADT - 7.31 hrs ECD - 11.85 ppg WOB 22-25 k RPM 150 GPM 650 @ 3100 psi String wt. PU 275 SO 145 Rot 187 Torque on/off btm - 21,000/19,500 ft/Ibs Observed sli ht flow on connections a='a~e i~ of 23 Time Logs _ Date From To Dur 5 De th E. th Phase Code Subcode T COM 01/03/2008 00:00 12:00 12.00 12,997 13,966 INTRM2 DRILL DDRL T Drill 8 3!4" hole w/ GP f! 12,997' to 13' 966 MD 6775' TVD ADT - 7.2 hrs ECD - 11.94 ppg WOB 18/30 k RPM 150 GPM 550 @ 2540 psi String wt. PU 260 SO 150 Rot 195 Torque on/off btm - 19,000/18,000 ft/Ibs Observed sli ht flow on connections 12:00 23:00 11.00 13,966 14,615 INTRM2 DRILL DDRL T Drill 8 3/4" hole w/ GP f/ 13,966' to 14,615' MD 6900' TVD ADT - 8.87 hrs ECD - 11.77 ppg WOB 25/30 k RPM 150 GPM 550 @ 2630 psi String wt. PU 260 SO 150 Rot 195 Torque on/off btm. - 19,500/18,00 ft/lbs. 23:00 00:00 1.00 14,615 14,615 INTRM2 DRILL CIRC. T Circ btms up for wiper trip - 550 gpm @ 2630 psi w/ 120 rpm -Std back 1 std to 14,520' 01/04/2008 00:00 02:45 2.75 14,615 14,615 INTRM2 DRILL REAM T Back ream from 14,520' to 13,187' 120 RPM 550 GPM 2510 ICP, 2450 FCP 02:45 04:00 1.25 14,615 14,615 INTRM2 DRILL REAM T TIH to 14,520', wash and ream to 14,615 04:00 07:00 3.00 14,615 14,729 INTRM2 DRILL DDRL T Drill 8 3/4" hole w! GP f/ 14,615' to 14,729' MD 6910' TVD ECD - 11.62 ppg WOB 14/30 k RPM 150 GPM 550 @ 2520 psi String wt. PU 280 SO 142 Rot 198 Torque on/off btm. - 21,500/20,00 ft/Ibs. 07:00 08:30 1.50 14,729 14,729 INTRM2 DRILL CIRC T Stand back 1 stand of 5" DP, circulate buttoms up rotate at 120 RPM 550 GPM 2520 is 08:30 12:00 3.50 14,729 14,829 INTRM2 DRILL DDRL T Wash and ream to bottom Drill 8 3/4" hole w/ GP f/ 14,729' t! 14829' MD,6907' TVD ECD - 11.62 ppg WOB 14/30 k RPM 150 GPM 550 @ 2520 psi String wt. PU 280 SO 142 Rot 198 Torque on/off btm. - 21,500/20,00 ft/Ibs. ADT 4.37 Eaage 17 off 23 C~ ~~ Time Logs __ __ __ Date From To Dur S. Depth E. De th Phase Code Subcode T COM _ 01/04/2008 12:00 00:00 12.00 14,829 14,860 INTRM2 DRILL DDRL T Drill 8 3/4" hole w/ GP f/ 14,829' to 14,860' MD 6912' TVD ADT 10.51 hrs ECD 11.43 ppg WOB 28 k RPM 150 GPM 550 @ 2410 psi String wt. PU 280 SO 142 Rot 195 Torque on/off btm. - 16,000/16,000 Note - Hit Kup C @ approx. 14,720' & back out @ 14,760' - Drill to 14,860' Attempting to get back through cirite cap -Pulled up to 14,859' -Began time drillin 1630 hrs -attempting to et back throu h ca 01/05/2008 00:00 04:45 4.75 14,860 14,861 INTRM2 DRILL DDRL XT Continue time Drilling of 8 3/4" hole w/ GP f/ 14,860' to 14,861' MD 6912' TVD ECD 11.6 ppg WOB 28/32 k RPM 150 GPM 550 @ 2500 psi String wt. PU 280 SO 142 Rot 198 Tor ue on/off btm. - 17,000/21,000 04:45 06:00 1.25 14,861 14,861 INTRM2 DRILL DDRL XT Reset MWD amd unclog GEO SPAN 06:00 09:00 3.00 14,861 14,860 INTRM2 DRILL DDRL XT Continue time Drilling of 8 3/4" hole w/ GP f/ 14,861' to 14,864' MD 6912' TVD Increased WOB form 30K to 40K, jumped off ledge II TD Cc~14860 ECD 11.6 ppg WOB 28/32 k RPM 150 GPM 550 @ 2520 psi String wt. PU 280 SO 142 Rot 198 Tor ue on/off btm. - 17,000/21,000 09:00 11:00 2.00 14,860 14,860 INTRM2 DRILL CIRC P Circulate hole & increase MW to 10.8 RPM 120, 20 K torque, 550 GPM @ 2500 PSI 11:00 11:30 0.50 14,860 14,860 INTRM2 DRILL CIRC P Spot 120 BBIs WBSP at bit. 550 GPM 2450 PSI 120 RPM 11:30 12:45 1.25 14,860 14,860 INTRM2 DRILL TRIP P POOH w/pump from 14,860' to 14,350' 126 GPM @ 360 psi, started to pull tight, ran back in hole to 14,860' 12:45 16:00 3.25 14,860 13,096 INTRM2 DRILL REAM NP Wiper trip from 14,860' to 13,096' w/ pump 550 gpm @ 2450 psi w/ 110 RPM, 16:00 17:00 1.00 13,096 14,860 INTRM2 DRILL REAM NP Blow down top drive and flow check - static. Run back in hole to 14,860' 17:00 18:30 1.50 14,860 14,860 INTRM2 DRILL CIRC NP Condition mud and circulate buttoms up. 550 GPM, 150 RPM, 2550 PSI, 18:30 21:00 2.50 14,860 13,377 INTRM2 DRILL TRIP P Flow check well -Static. spot WBSP in DP - POOH from 14,860' to 13,377' spotting pill 126 GPM, 360 PSI 21:00 22:45 1.75 13,377 12,425 INTRM2 DRILL TRIP P Flow check well -Static. Pull out of hole from 13,377' to 12,425' 550 GPM, 2410 PSI, 120 r m Sage 1$ caf 23 • Time Logs _ Date From To Dur S. De th E. Depth Phase Code Subcode T COM 01/05/2008 22:45 00:00 1.25 12,425 12,425 INTRM2 DRILL CIRC P Flow check -static. Circulate btms up 550 GPM, 2410 psi, 120 rpm Observed 1st WBSP @ shakers - Circ to et ill out of hole 01/06/2008 00:00 04:45 4.75 12,425 8,620 INTRM2 DRILL TRIP P Flow Check well -static. POOH on TT F/12,425' to 8,620' 04:45 05:30 0.75 8,620 8,429 INTRM2 DRILL REAM NP Back ream F/ 8,620' T/8,429' 450 GPM, 1420 PSI, 120 RPM 05:30 06:00 0.50 8,429 8,144 INTRM2 DRILL TRIP P POOH on TT F/8,429' T/8,144' 06:00 07:15 1.25 8,144 7,573 INTRM2 DRILL REAM NP Back ream Fl8,144 T/7,573' 450 GPM, 1400 PSI, 120 RPM 07:15 08:30 1.25 7,573 7,477 INTRM2 DRILL CIRC NP CBU reciprocating and rotating DP F/7,573' T/7,477' 450 GPM, 1390 PSI, 120 RPM 08:30 08:45 0.25 7,477 7,287 INTRM2 DRILL TRIP P TOOH on TT F/7,447 T/7,287' Over ull and im ro er hole fill 08:45 10:30 1.75 7,287 6,336 INTRM2 DRILL REAM NP Back Ream F/7287 T/6336' 450 GPM, 1320 PSI, 120 RPM Flow Check -well static, blow down TD 10:30 10:45 0.25 6,336 6,240 INTRM2 DRILL TRIP P POOH on TT F/6240' T/6145 swabbin 10:45 11:45 1.00 6,145 5,765 INTRM2 DRILL REAM NP Back ream F/6240 T/5765 GPM 450, 1300 PSI, 120 RPM Blow down TD and flow check -static 11:45 12:00 0.25 5,765 5,670 INTRM2 DRILL TRIP P POOH on TT F/5765 T/5670' 12:00 16:00 4.00 5,670 3,861 INTRM2 DRILL REAM NP Back ream f/ 5670' to 3861' - 450 gpm 1250 si w/ 120 r m 16:00 16:45 0.75 3,861 3,861 INTRM2 DRILL CIRC P Circ hole clean - 450 gpm @ 1200 psi w/120r m 16:45 18:00 1.25 3,861 3,005 INTRM2 DRILL TRIP P Flow ck( static) -Blow down TD - POOH on TT f/ 3861' to 3005' 18:00 18:45 0.75 3,005 2,434 INTRM2 DRILL TRIP P Monitor well (static) Cont. POOH on TT f/ 3005' to 2434' Hole fill 'ust under ro er fill 18:45 19:30 0.75 2,434. 2,434 INTRM2 DRILL CIRC P Circ to clean BHA tools - 450 gpm @ 1000 psi w/ 120 rpm Last fill 'ust short of ro er fill 19:30 22:15 2.75 2,434 720 INTRM2 DRILL TRIP P Blow down TD -POOH on TT f/ 2434' to 720' - LD ghost reamer -Monitor well for 15 mins. static 22:15 00:00 1.75 720 83 INTRM2 DRILL PULD P Std back HWDP & jars - LD NM flex DC's -Plug in & down load MWD - Pull up & service Geo-Pilot & break bit while down loadin MWD 01/07/2008 00:00 01:00 1.00 83 0 INTRM2 DRILL PULD P L/D MWD, NIMPC, GP, subs & GS Clear floor and LD elevators & bales 01:00 02:15 1.25 0 0 INTRM2 DRILL RURD P PJSM, change to 7" RAMS & 4" saver sub. Page 19 of 23 C7 • Time Logs _ Date From To Dur 5 De th E. De th Ph se Code Subcode T COM ~ 01/07/2008 02:15 03:15 1.00 0 0 INTRM2 WELCT BOPE P Pull wear ring and set test plug, R/U test equipment, test 7" RAMS - 250/low 3500 psi high, test good R/D test a ui ment. 03:15 04:00 0.75 0 0 INTRM2 CASIN RURD P Pull test plug & set thin wall wear ring. 04:00 05:30 1.50 0 0 INTRM2 CASIN RURD P RU csg equipment 05:30 06:00 0.50 0 0 INTRM2 CASINC SFTY P PJSM on running 7" casing 06:00 09:30 3.50 0 2,983 INTRM2 CASINC RNCS P R_un 7" 26# L-80 BTCM as follows: FS( ~ Oil Tools Silver Bullet) 2 jts. csg - Ray FC (Halliburton Super Seal) 2 jts, csg ( First four jts. made up w/ BakerLoc - fill pipe & check floats) 66 jts csg (70 ~ts total to 2983' 09:30 10:00 0.50 2,983 2,983 INTRM2 CASINC CIRC P Circulate one csg volume at 9 bpm - 750 si. 10:00 14:30 4.50 2,983 6,395 INTRM2 CASIN RNCS P Continue running 7" 26# L-80 BTCM cs f/ 2983 to 6395' 150 'ts total 14:30 15:45 1.25 6,395 6,395 INTRM2 CASIN CIRC P Break circ & stage pumps up to 4.5 bbls/min -Circ btms up + & condition mud @ 370 psi - PU wt. 170 SO wt 130 15:45 21:00 5.25 6,395 9,799 INTRM2 CASINC RNCS P Continue running 7" 26# L-80 BTCM cs f/ 6395' to 9799' 230 'ts. total 21:00 00:00 3.00 9,799 9,799 INTRM2 CASIN CIRC P Break circ & stage pumps up to 4.3 bbls/min -Circ btms up + to condition mud -FCP 500 psi PU wt. 220 SO wt. 125 01/08/2008 00:00 05:15 5.25 9,799 13,202 INTRM2 CASINC RNCS P Continue running 7" 26# L-80 BTCM Casing F/9,789' T/13,202' (310 jts total 05:15 08:00 2.75 13,202 13,202 INTRM2 CASIN CIRC P Establish circ -Stage pump up f/ 3 bbls/min to 4.2 bbls/min -circ & condition mud - ICR 650 psi FCP 650 si - PU wt. 290 SO wt. 155 08:00 11:15 3.25 13,202 14,855 INTRM2 CASIN RNCS P Continue running 7" 26# L-80 BTCM casing (/13,202' to 14,818' (348 jts total) PU FMC fluted csg hanger & landing jt. -Land csg w/fluted hanger in wellhead w/ FS @ 14,855' - FC @ 14,766' -TAM PC 8289' 11:15 12:00 0.75 14,855 14,855 INTRM2 CASINC RURD P R/D tongs, slips, and Franks. R/U CMT head 12:00 15:00 3.00 14,855 14,855 INTRM2 CEME~ CIRC P Establish circulation @ 1.5 bpm / 480 psi -Attempted to reciprocate pipe w/ 425k unable -stage pumps up to 5.0 bpm -circulate and condition mud until mud wt. in & out @ 10.8 ppg - FCP=550 psi -Total of 984 bbls um ed - ull returns throu hout 15:00 15:15 0.25 14,855 14,855 INTRM2 CEME~ SFTY P Held pre job safety & ops meeting w/ crew on cementin 7" cs Page 2~ of 23~ l • Time Logs , _ Date From To Dur S. Depth_ E. th Phase Code Subcode T COM _ 01/08/2008 15:15 18:30 3.25 14,855 14,855 INTRM2 CEME DISP P Perform 1st stage cement job as follows: Pump 5 bbls CW-100 -Test lines to 4400 psi - Drop bottom plug - Pump 35 bbls CW-100 @ 4 bbls/min @ 800 psi -Pump 40 bbls MudPush @ 10.5 ppg @ 4 bbls/min @ 800 psi - Mix & pump 88 bbls (148 sks) 11.0 Lead slur (LiteCrete w/ .4% DO46, 1 % DO65, .01 % B155, .25%D167) @ 5 bbls/min @ 900 psi - Mix & um 22 bbls (107 sks) 15.8 tail slur Class G w/ .2% DO46, .25% DO65, .25% D800,.18% D167) @ 3 bbls/min @ 600 psi -Drop top plug w/ 10 bbls water f/ Dowell - Switched over to rig pumps & displaced w/ 238 bbls 10.7 ppg inhibited CaCl2 @ 5 bbls/min @ 570 psi & 315.4 bbls 10.7 ppg CaCl2 @ 6 bbls/min @ 760 psi -slowed pumps to 4 bbls/min for last last 13 bbls - Bumped plug w/ 1500 psi - CIP @ 1815 hrs. -Checked floats OK - Fu^ II returns throu h 'ob -Unable to move rin 'ob. 18:30 19:00 0.50 14,855 14,855 INTRM2 CEME OTHR P RD cement equipment 19:00 20:15 1.25 14,855 14,855 INTRM2 CASIN RURD P LD landing jt. -Pull thin wall wear bushing -Set 7" x 9 5/8" pack-off - Test to 5000 si for 10 mins. 20:15 22:45 2.50 0 0 INTRM2 CASIN OTHR P PJSM on changing rams -Changed top oioe rams f/7" to 3 1/2' x 6" VBR - set test oluo & test to 250 & 3500 psi w/ 4" test jt. -Pull test plug -set wear bushin 22:45 00:00 1.25 0 0 INTRM2 DRILL PULD P RU & LD 5" DP f/ driller's side of derrick via mouse hole 01/09/2008 00:00 02:45 2.75 0 0 INTRM2 DRILL PULD P Lay down 5" drill pipe from derrick 02:45 03:15 0.50 0 0 INTRM2 CEME OTHR P Change elevators and dress iron rou hneck for 4" drill i e 03:15 03:45 0.50 0 0 INTRM2 CEME PULD P Pick up and MU Baker plug dropping assembly -torque all connections - La down com lete assembl 03:45 04:00 0.25 0 0 INTRM2 CEME SFTY P Held pre-job safety and Opts meeting on Tam Combo tool 04:00 04:30 0.50 0 38 INTRM2 CEME PULD P PU & MU Tam Port Collar Premium Combo tool 04:30 09:00 4.50 38 2,784 INTRM2 CEME TRIP P RIH from 38' to 2,784' with 4"drill pipe from derrick -ran slowly to avoid fluid runnin over to of stands CaCl2 09:00 10:30 1.50 2,784 2,784 INTRM2 RIGMN SVRG P PJSM -Slip and cut drilling line - Service Top Drive and Drawworks - ad'usted brakes Page 21 of 23 1 Time Log date From To Dur S de th E. De th Phase Gode Subcode T GOM 01/09/2008 10:30 17:30 7.00 2,784 8,291 INTRM2 CEME TRIP P RIH F/ 2,784' to 8,280' picking up 4" drill pipe from shed -locate shifting sleeve in port collar @ 8,291' - adjusted space out pups to have access to Top rams or annular reventor. 17:30 18:30 1.00 8,291 8,291 INTRM2 CEME RURD P PJSM- M\U Plug dropping head & R/U for CMT 'ob 18:30 21:30 3.00 8,291 8,291 INTRM2 CEME OTHR P PJSM- Establish CIRC @ 105 GPM, 230 PSI, Displace DP w/10 BBLS water, Drop ball and pump 84 BBLS Of 10.8 PPG mud. After ball seated, attempted to test cups @ 1000 PSI -observed slight flow at flow line, open Establish PC and close to rams ~ . p ~/ P ~,~ ~ circulation with 10.8 mud takin returns out 9 5/8" x 7" annulus at 1.0 b m / 290 si -staged pump up to 4.5 b m and CBU - FCP=810 si 21:30 22:30 1.00 8,291 8,291 INTRM2 CEME DISP P P SM -Cement 2nd stage as follows: Pump 5 bbls CW-100 -test lines to 2300 PSI -Pump 30 bbls Mud Push @ 10.5 ppg @ 4 bbls/min @ 800 psi - Mix & um 40 bbls 204 sks 15.8 ppg Tail slurry (Class G w/ .2% DO46, .3% DO65, 1 % SOO2)) @ 4 bbls/min @ 400 psi - Drop Dart w/ 10 bbls water f/ Dowell -Switched over to rig pumps & displaced w/ 67 bbls 10.7 ppg un-inhibited brine @ 210 gpm @ 570 psi -Bumped Dart w/ 1800 psi - CIP 2230 hrs. 22:30 23:30 1.00 8,291 8,291 INTRM2 CEME OTHR P Shear Dart @ 2100 PSI, close PC, shear ball seat @ 2600 PSI. RU & reverse circulate 2 DP Volumes @ 168 GPM 750 PSI -observed slight trace of cmt on btms u 23:30 00:00 0.50 8,291 8,291 INTRM2 CEME RURD P R/D Plug dropping head 01/10/2008 00:00 01:15 1.25 8,291 8,280 INTRM2 CASIN DHEQ P Release closing tool from port collar - Pull up to 8,280'- LD 2 pup joints - RU and test 7" casing to 300 ~s~ f^• ~' minutes -Blow down kill line 01:15 02:45 1.50 8,280 8,280 INTRM2 CASIN( OTHR P RU and pumped 208 bbls 10.7 ppg inhibited CaCl2 brine -followed by 19 bbls 10.7 ppg CaCl2 to equilize inhibited brine to 2850' 02:45 09:00 6.25 8,280 38 INTRM2 CEME TRIP P POOH laying down 4"drill pipe from 8,280' to 38' 09:00 09:30 0.50 38 0 INTRM2 CEME PULD P Service break and lay down Tam Combo tool assembl 09:30 10:00 0.50 0 0 INTRM2 CEME OTHR P PU and service break Baker plug dro in assembl - LD same 10:00 10:45 0.75 0 0 INTRM2 RPCO OTHR X Clear tools from rig floor -pull wear bushin 10:45 11:15 0.50 0 0 INTRM2 RPCOti RURD X RU to run 3 1/2" tubing Page 22 0~ ~3 • l~ Time Logs ~ Date From To Dur S. De th E. Dgpth Phase _ Code Subcode T COM 01/10/2008 11:15 11:30 0.25 0 INTRM2 RPCOb SFTY X PJSM on running tubing 11:30 15:15 3.75 0 2,845 INTRM2 RPCOCv RCST X Run 3 1/2" kill string as follows: WLEG - 91 jts 3 1/2" 9.3# L-80 EUE Mod - XO (3 1/2" EUE(P) to 4 1/2" IBT - (B) - MU FMC tbg hanger (w/ elastmer seals) & land tbg hanger in wellhead w/ tail 2845' 15:15 16:15 1.00 0 0 INTRM2 RPCOh RCST X LD landing jt. A - set TWC - PU lading jt. B -test hanger seals to 5000 psi - LD landin 't. B 16:15 18:00 1.75 0 0 INTRM2 WELCT NUND X ND BOPE -Change saver sub & grab dies in TD 18:00 20:00 2.00 0 0 INTRM2 RPCOti OTHR X NU & test tree to 5000 psi -Pull TWC 20:00 00:00 4.00 0 0 INTRM2 RPCOh FRZP X RU on well to pump inhibited CaCl2 brine & diesel -Held PJSM -Test lines to 1000 psi -Pumped 40 bbls 10.7 ppg inhibited brine followed by 54 bbls diesel w/ Dowell -Shut down - shut in well -Blow down lines - RU line to U-tube fluid to equalize brine f/ 2845 to 1520' & diesel f/ 1520' to surface -Shut inwell -Blow down & RD lines -Set BPV -Secure well 01/11/2008 00:00 11:30 11.50 0 0 INTRM2 DRILL PULD P LD 5"DP - 11:30 13:00 1.50 0 0 INTRM2 DRILL OTHR P Clean drains, drip pans, pipe racks Release ri 1300 hrs. E~~ge ~3 oaf ~~ l~ ___..J -' `~ ~~ Date 1/24/2008 "Class INFORMATION Category Information Request Subj. Doug Halting Start 3:00:19 PM End 4:52:55 PM Priority I PTD /Proj BrooksRg Sundry No. ~- Description New development wells request. TASK L I Applications IS ...~,, ~~ Y ,' PPT Proj PSP Current ~ - Project s Note ad Email Home Pa a Calendar ~ 100%UIC ~ 30%UIC Notes: Follow-up Needed Contact -1st Cell -Primary Company: ~ Fax -Primary Tele -Primary Email Contact - 2nd ~~ Cell - 2nd Company: Fax - 2nd ~- Tele - 2nd Email: Well Log Directories ac ~~ ~~ 2008 Docs Read Tea Geology CO's Notices Field/Pool Googie Naturally Speaking Permitting 401 Ledger 407 Ledger 401's Dualica .. to Info Requests Database PTD Text LAS Maooer Quads t Mud Wt. H2S STable Orders RE Find Stuff Contact State Employee Finder Project Report C` Reporting Weekly Weekly -° ' Summary Ltr v l~~o f G~-aG ~--~ ~ ~~~ G~~ . ~~ .,~ ~,z~~ ,~ .z~2 1sa STATE OF ALASKA ALASKA OIL AND GAS CONSF,RVATION COMMISSION W. 7th Ave. Suite 100 ANCHORAGE, ALASKA 99501-3192 REQUEST FOR EXAMINATION OF AOGCC RECORDS 1, the undersigned, request that I be authorized to examine the AOGCC records listed below, I agree not to remove or alter the contents of records and [agree not to remove the records from the room designated for examination. t, certify that lam ne forum with the State Signature: Printed name: Company/Firm: Address: AOGCC RECORDS REQUESTED ' Phone No: ,~j 3l/- Ic~1'~ -" C ~ - 3a/ ~ FOR AOGCC USE ONLY: Date and Time Records Requested (6 AAC 96.320): Date and Notice of Receipt of Request Sent (6 AAC 96.310): Date Additional Information Requested (6 AAC 96.315): _ Date and Time Records Provided for Review: Date and Time Records Returned: Name of AOGCC Employee Handling Request: r a party, nor representing or acting on behalf of a party, involved in litigation in a judicial or administrative Alaska or public agency to which these records are relevant. AOGCC will respond to this request as soon a practicable, but no Later than the 10th working day after the request is received (6 AAC 96.325) This request is a public record. (6 AAC 96.320) \\ Common\Library\Request for Examination of Records Form.doc WELL LOG TRANSMITTAL To: State of Alaska March 19, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7`" Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Data: CD4-301 AK-MW-535576 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted CD Rom with verification listing. API#: 50-103-20557-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. ~` ~g~,°~1~ka~99;518 ± `~ ~., ' ,, ; ,~ °3,.~ '~ 4 ~>jf~ ,I~~te: _ - Signed: ~d~ - !v U ~ / ~~(o ~. J 05-Mar-08 AOGCC Attn: Christine Mahnken 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD4-301 Dear Dear Sir/Madam: Enclosed are 2 survey hard copy(s) and a disk with the *.PTT and *.PDF files. Tie-on Survey: 36.90' MD Window /Kickoff Survey: 0.00' MD (if applicable) Projected Survey: 15,883.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO Timothy.Allen@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Timothy Allen 6900 Arctic Blvd. Anchorage, AK 99518 ~ ~ ~ i Date ~ r ~.~~4U Signed Please call me at 273-3534 if you have any questions or concerns. Regards, Timothy Allen Survey Manager Attachments} ~~ - Aso ~r • CO1~T5ER'Q~ ATIO C rIIIISS IDI~1T C. Alvord Alpine Drilling Team Lead Conoco Phillips Alaska Inc PO Box 100360 Anchorage, Alaska 99510 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Colville River Field, Nauq-Kuparuk Oil Pool, CD4-301 Sundry Number: 307-380 Dear Mr. Alvord: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission shown, a person affected by it may file with the Comrnissionf an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this,~Oday of December, 2007 Encl. Sincerely, ~s STATE OF ALASKA ~ ~a~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 ,,r ~ F ~~E.G ~. 9 ~U07 r;..r C~flsr f ~~~~.. ~'~ 1. Type of Request: Abandon Sus end p ^ O erational shutdown p ^ Perforate Waiver ^ Other ^ Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension ^ Change approved program ^~ ~ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development ~ Exploratory ^ 207-150 ' 3. Address: Stratigraphic ^ Service ^ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-103-20557-00 ' 7. KB Elevation (ft): 9. Well Name and Number: 55.9 ft MSL CD4-301 8. Property Designation: ~ 10. Field/Pools(s): ADL 380077, 384219, 372096, 380082 / ALK LAS2112 Nanu Kuparuk Oil Pool r 11. PRESENT WELL CONDIT ION SUMMARY Total Depth MD (ft): ~ Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured) Junk (measured): 9 653 13 9205' 5667' Casing ~ Length Size MD TVD Burst Collapse Structural I~ 4'' Conductor 80' 16" 114' 114' Surface 2998 9.625" 3035 2387 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None None None None Packers and SSSV Type: Packers and SSSV MD (ft): None None 12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work: Detailed Operations Program^ BOP Sketch ^ Exploratory ^ Development ~ ~ Service ^ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 12/18/2007 ~~ Gas ^ Plugged ^ ~ Abandoned 16. Verbal Approval: Date:12/18/2007 WAG ^ 17 (a\ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: T. Maunder /C.~ofr~~Cr 17. Thereby certify that the foregoing is true and correct to the best of my knowledge. Contact L. Galiunas Printed Name C. Alvord Alpine Drilling Team Lead Signature ~ Ph one 907-265-6120 Date f L ~(k I Zs~ COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~~~ -38 0 Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Locat on Clearance ^ other. ~Cs Z~ ~` ~ l v WGZ ~ S P P S i C~ ~O~I~UL~ '~~ C'09\CMS ~nCC~un~~ P ~Q~ ~~~-:~, ~ Subsequent Form Required: ~O A d b APPROVED BY MISSIONER THE COMMISSION D t ' ~? ~~ pprove y: 1, a e:! , -` ~~ ~ ~. v `ORIGINAL ~~~~'~~ ~ `Z.~.°' Form 10-403 Revised 7/2005 SUBMIT IN DUPLICATE ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 December 18, 2007 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 ~v"7 ~- /SD Conocot~illips Re: Application for change to Approved Program- Plug back abandonment and change to approved program for CD4-301 (permit no. 207-150) Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Sundry for a change to Approved Programs for CD4-301. Drilling operations on CD4-301 began on 12-09-07 with Doyon 19 (permit no. 207-150) and the well was drilled to the planned landing point in the Kuparuk reservoir. The sand was thinner than expected at the planned landing point, and additional 8-3/4" hole was drilled to confirm formation tops. Unfortunately sand quality and thickness were not ~ sufficient for the well to be economically viable. It was decided to plug back the existing wellbore with cement, and sidetrack to another location north-west of the original landing location. The Nanuq sand will be plugged back with providing +/-100' MD above and below the Kick off plug from +/-10,400' to 9800' MD plugs. cement from13,715' MD to +/-13,115' MD, reservoir penetration. There will also be a with a mud gap between the two cement Since the abandonment plug is planned with sufficient volume to cover +/-245' MD above the Nanuq interval, and another plug is planned to kick off from, ConocoPhillips requests that the requirement to tag the bottom abandonment plug is waived (provided there are no problems during cementing operations). Once the well CD4-301A is kicked off, the 8-3/4" section will be drilled to a new bottom hole location and landed in the Kuparuk sand horizontally. Intermediate casing will then be run and cemented in place. The productive interval will then be drilled horizontally. The well, CD4-301A, will be completed as a slotted liner producer. The 8-3/4" plugged back hole will maintain the name CD4-301and once re-drilled the new sidetracked hole will become CD4-301A with an API extension -01. Please find attached the information: 1. Form 10-403 APPLICATION FOR sundry approval 2. A proposed plug back and drilling program 3. Proposed plug back schematic 4. Actual rig surveys for CD4-301 5. Log showing location of Nanuq sand and lack of Kuparuk C sand. `~~ C] If you have any questions or require further information, please contact Liz Galiunas at 265-6247 or Chip Alvord at 265-6120. Sincerely, Liz Galiunas Drilling Engineer Attachments cc: CD4-301 Well File /Sharon Allsup Drake ATO 1530 Chip Alvord ATO 1577 Liz Galiunas ATO 1702 Jack Walker ATO 1740 Lanston Chin Kuukpik Corporation Alpine : CD4-301 Procedure Plug back Procedure 1. POOH with 8-3/4" hole drilling assembly. 2. Pick up 3-1/2" tubing stinger and run in hole to 14160' MD. Lay in 30 bbls high vis pill. ,~ 3. Pick up to 13715' MD and pump +/- 600 ft MD 15.8 ppg isolation plug (Nanuq from 13360' -13615' MD). - 4. Pick up to 13115' MD and circulate hole clean. 5. Pull out to +/- 10,800' MD and spot a +/- 400ft MD hi vis pill. 6. Pick up to +/- 10,400' MD and pump a +/- 600' MD balanced kick off plug (17 ppg). 7. Pick up to 9,800' MD and circulate hole clean. 8. Pull out of hole and lay down tubing stinger. 9. Make up 8-3/4" drilling assembly and kick off at 10,000' MD. Re-land in the Kuparuk sand. Abandonment plug schematic: CD4-301 Plug Back RKB-GL=36.3' Wel Ihead 16" Conductor to 114' 9-5/8" 40 ppf J-80 BTCM Surface Casing @ 3046' MD / 2387' TVD cemented to surface 10.0 ppg drilling mud in hole KOP 10,000' Top Nanuq Reservoir at +/-13360' - 13615' MD , Updated 12/18/07 Plua #2:600' Kick off olua Too at +/- 9800' MD 17.0 ooa. 30 bbls Hi Vis 4 Pill X400 ft Plua #1 : +/- 600' Too Caa 600 +1-13115' MD 15.8 ooa 30 bbls Hi Vis 4400 ft 14160 Pill ~ mud Pilot Hole @ +/- 85 deg TD at +/- 15883' MD ~ Plu~back Cementing Requirements ~p~1 ~~~~ ~ ~ ~ S Cement Plug #1: 13715' MD to 13115' MD = 600' Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.41758 ft3~ft X 1.15 (15% excess) = 288 ft3 annular vol. b 250 Sx @ 1.16 ft3/sk. Cement Plug #2: 9,800' MD to 10,400' MD = 600' Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.41758 ft3~ft X 1.15 (15% excess) = 288 ft3 annular vol. b 288 Sx @ 1.0 ft3/sk. 5~ Operator: ConocoPh8lips(Alaska) Inc. -WNS Grid Correction: -0.93 Job No: Field: Western North Stope Magnetic Declination: 22.32 AFE No: Well: CD4301 Rig Surveys Dip: 80.65 API No: Rig: Dogleg per: 100 ft North Reference: TRUE Surface Location Original VS Plane: 66.00 Parent Well: Rig: CD4-301 X: 1513208:24 ft View VS Plane: 66 RKB Height (above system),., .55.90 ft Y: 5957273.28 ft Slart Date: O1 /Ol /00 TD Date: 12/18/07 Meas. Incl. TRUE Subsea RKB Local ASP or Grid Dogleg Original iz ni..e waixo«o<w°.< Tool Dist from Drilled '£ nrluesity I DD Depth (@) Angle (deg) Azi. (deg) TVD (ft) TVD (ft) N(+)/S(-) (ft) E(+)/W(-) (D) N(+)/S(-) Let (Y) E(+)/W(-) Dep. (X) Severity (°/100 ft) VS (66°) (ft) (6 (ft) 13444 (ft) Face (degJ VS Plane (ft) Distance (fl) Comments ~' ^^ pp ~/ 4.73. ~_! c Q c v..7p 36,90 0.00 O.OU -19.00 36.90 000. 0.00 5957273.28 1518208.24 0.00 0.00 ## 0.00 0 0.00 81.00 0.45 77.00 25.10 81.00 0.04 0.17 5957273.31 1518208.41 1.02 0.17 ## 0.17 77 0.03 44.10 CB-GYRO-SS (1) 172.00 0.78 98.00 116.09 171.99 0.03 1.13 5957273.29 1518209.37 0.43 LOS ## 1.15 45 0.43 135.10 262.00 1.25 111.00 206.08 261.98 -0.40 2.65 5957272.83 1518210.89 0.58 2.26 ## 2.74 33 1.45 225.10 1.37 0.57 353.00 2.75 122.00 297.02 352.92 -1.92 5.43 5957271.27 1518213.64 1.69 4.18 ## 5,92 7.0 3.96 316.10 2.91 1.23 444.00 5.40 128.00 387.78 443.68 -5.71 10.66 5957267.40 1518218.50 2.95 7.41 ## 12.39 12 9.55 407.10 5.59 1.84 480.19 5.87 133.01 423.80 479.70 -8.02 13.35 5957265.04 1518221.46 1.88 8.94 ## 15.94 49 12.76 443.29 MWD+IFR-AK-C 6.27 2.00 570.30 7.85 122.53 513.26 569.16 -14.47 21.91 5957258.45 1518229.91 2.59 14.13 ## 26.70 -38 22.14 533.40 8,60 2.36 661.37 9.30 119.34 603.31 659.21 -21.42 33.57 5957251.31 1518241.46 1.68 21.95 ## 40.28 -?0 33.23 624.47 10.13 2.61 751.19 9.00 109.43 692.00 747.90 -27.32 46.52 $9$7245.21 1518254.31 1.78 31.39 ## 54.56 -106 43.88 714.29 11.73 2.81 843.01 9.66 110,13 78260 838.50 -32.36 60.53 5957239.94 1518268.23 073 42.14 ## 69.45 10 54.18 806.11 12.40 2.94 937.81 11.79 108.61 875.74 931.64 -38.19 77.18 5957233.84 1518284.78 2.27 54.97 ## 87.09 -8 66.28 900.91 14.55 3.10 1033.16 15.30 113.10 968.43 1024.33 -46.23 97.99 5957225.46 1518305.46 3.84 70.71 ## 109.42 19 82.09 996.26 18.21 3.30 1128.54 18.15 113.76 1059.76 111.5.66 -57.16 123.17 $9$7214.13 1518330.45 2.99 89.27 ## 136.86 4 102.31 1091,64 21.07 3.46 1223.73 20.24 109.87 1149.66 1205.56 -68.73 152.22 5957202.09 1518359.32 2.57 111.11 ## 168.16 -33 124.70 1186.83 23.51 3.60 1319.10 24.53 109.64 1237.82 1293.72 -81.00 186.40 5957189.27 1518393.29 4.50 137.34 ## 204.47 -1 149.81 1282.20 27.81 3.76 1414.12 27.63 110.40 1323.16 1379.06 -95.31 225.64 5957174.32 1518432.28 3.28 167.37 ## 246.24 6 178.85 1377.22 30.92 3.89 150995 29.24 111.23 140225 1463.15 -ALSO 268.20 $9$71$7.44 1518474.57 1.73 199.66 ## 291.77 74 210.95 1472.85 32.58 3.99 1604.43 30.32 110,93 1489.42 1545.32 -128.41 312.08 5957139.82 1518518.16 1.15 232.87 ## 338.80 -8 244.24 1567.53 33.67 4.07 1699.32 33.66 110.63 1569.89 1625.79 -146.24 359.07 595712].24 1518564.86 3.52 - 268.55 ## 389.06 -3 279.64 1662.42 37.02 4.18 1794.72 37.15 109.28 164264 1703.54 -165.07 411.02 $9$7101.56 1518616.49 3.75 308.35 ## 444.32 -13 317.98 1757,82 40.59 4.28 1890.15 39.51 107.54 1722.50 1778.40 -183.74 467.18 $9$7081.99 1518672.33 2.72 352.05 ## 503.50 -25 357.87 1853.25 43.19 4.36 1984.93 42.94 107.58 1793.77 1849.67 -202.58 526.72 5957062.18 1518731.55 3.62 398.78 ## 565.95 0 399.30 1948.03 46.62 4.45 2080.54 47.38 107.87 1861.17 1917.07 -223.22 591.28 5957040.49 1518795.76 4.65 449.37 ## 633.73 3 444.42 2043.64 51.06 4.55 2175.68 50.06 108.42 1923.93 1979.83 -245.49 659.21 $9$7017.12 1518863.32 2.85 502.37 ## 705.22 9 492.39 2138.78 53.77 4.62 2270,80 52.18 109.27 1983.64 2039.54 -269.41 729.28 $9$6992.07 1518932.98 2.33 556.65 ## 779.27 18 542.75 2233.90 55.99 4.69 2366.10 55.29 109.42 2040.00 2095.90 -294.87 801.77 5956965.44 1519005.05 3.27 612.52 ## 856.10 2 595.48 2329.20 59.11 4.76 2461.48 58.90 108.07 2091.81 2147.71 -320.58 877.59 5956938.50 1519080.43 3.97 671.33 ## 936.16 -18 649.81 2424.58 62.89 4.83 2556.47 60.93 106.31 2139.43 2195.33 -344.85 956.11 5956912.96 1519158.54 2.67 733.18 ## 1018.35 -37 703.92 2519.57 65.43 4.89 2651.69 63.74 106.82 2183.63 2239.53 -368.90 1036.93 595688260 1519238.95 2.99 797.24 ## 1102.68 9 758.77 2614.79 68.27 4.95 2746.99 67.27 107.96 2223.14 2279.04 -394.83 1119.67 5956860.34 1519321.26 3.86 862.28 ## 1189.38 17 816.10 2710.09 71.95 5.01 2842.01 68.55 108.09 2258.87 2314.77 -422.07 1203.40 5956831.74 1519404.52 1.35 927.69 ## 1277.43 5 875.04 2805.11 73.24 5.06 2936.93 67.82 106.50 2294.15 2350.05 -048.27 1287.53 5956804.18 1519488.21 1.73 993.89 ## 1365.55 -117 933.20 2900.03 74.89 5.11 2997.09 68.00 107.88 2316.77 2372.67 -064.74 1340.78 5956786.84 1519541.18 2.15 1035.84 ## 1421.29 8? 969.91 2960.19 76.18 5.14 3046.00 68.02 107.24 2335.09 2390.99 -478.42 1384.02 5956772.46 1519584.19 1.22 1069.77 ## 1466.65 -88 999.99 3009.10 9-5/8" x 12-I/4" 76.77 5.16 3095.92 68.04 106.58 2353.77 2409.67 -091.89 1428.31 5956758.28 - 1519628.25 1.22 1104.76 ## 1512.94 -88 1030.31 3059.02 77.38 5.18 3194.19 66.81 107.24 2391.49 2447.39 -518.28 1515.13 $9$6730.48 1519714.62 1.40 1173.33 ## 1603.68 154 1089.73 3157.29 78.76 5.22 3294.37 67.95 107,95 2430.02 2485.92 -546.23 1603.27 5956701.10 1519802.29 1.31 1242.49 ## 1696.15 30 1151.12 3257.47 80.07 5.26 3389.78 68.20 108.23 2465.65 2521.55 -573.72 168241 5956672.25 1519885.96 0.36 1308.17 ## 1784.66. 46 1210.45 3352.88 80.43 5.29 3485.18 68.78 108.38 2500.63 2556.53 -601.59 1771.67 $9$6643.01 1519969.75 0:63 1373.81 ## 1873.42 14 1270.19 3448.28 81.03 5.32 3580.43 69.20 109.26 2534.78 2590.68 -630.28 1855.83 5956612.97 1520053,43 0.97 1439.03 ## 1962.33 63 1330.62 3543.53 81.95 5.35 3675.81 68.80 108.83 2568.96 2624.86 -659.34 1940.00 5956582.55 15201.37.11 0.59 1504.10 ## 2051.38 -135 1391.40 3638.91 82.52 5.37 3770.71 68.08 109.48 2603.83 2659.73 -688.29 2023.38 5956552.24 1520219.99 0.99 1568.49 ## 2139.64 140 1451.77 3733.81 83.46 5.40 3865.85 67.48 109.76 2639.81 2695.71 -717.87 2106.34 5956521.32 1520302.46 0.69 1632.25 ## 2227.71 757 1512.53 3828.95 84.11 5.43 Meas. Incl. TRUE Subsea RKB Local ASP or Grid Dogleg Original ie eons wmnb. oy,mer Tool Dirt Gom Drilled uosity Tot t DDI Depth (R) Angle (deg) Azi. (deg) TVD (ti) TVD (ft) N(+)/S(-) (ft) E(+)/W(-) (R) N(+)/S(-) Let (Y) E(+)/IV(-) Dep. (X) Severity (°/100 ft) VS (66°) (It) (6 (ft) 13444 (R) Face ~degf VS Plsne ([t) Distance (ft) Comments ^' ry ~ } ~/ S~J.S! ~+ d U.9V 3961,04 66.80 109.88 2676.79 2732.69 -747.61 2188.85 5956490.25 1520384.47 0.72 1695.54 ## 2315.42 171 1573.26 3924.14 84.80 5.45 4055,77 66.47 110.22 2714.36 2770.26 -777.42 2270.54 5956459.11 1520465.66 0.48 1758.04 ## 2402.39 137 1633.72 40]8.87 85.25 5.48 4150.85 67.26 110.61 2751.72 2807.62 -807.92 2352.49 5956427.29 1520547.09 0.91 1820.49 ## 2489.82 24 1694.91 4113.95 86.12 5.50 4245.76 68.13 110.69 2787.74 2843.64 -838.89 2434.65 5956394.99 1520628.73 0.92 1882.96 ## 2577.63 5 1756.62 4208.86 87.00 5.52 4340,81 68.53 108.76 2822.84 2878.74 -868.70 2517.80 5956363.84 1520711.38 1.93 1946.79 ## 2665.96 -78 1817.67 4303.91 88.83 5.55 4435,99 67.42 108.92 2858.53 2914.43 -897.19 2601.30 5956334.00 1520794.40 1.18 2011.49 ## 2754.19 7 72 1877.67 4399.09 89.95 5.58 4530.99 68.94 106.86 2893.84 2949.74 -924.27 2685.23 5956305.56 1520877.86 2.57 2077.14 ## 2842.38 -52 1936.54 4494.09 92.40 5.61 4626.22 68.67 106.88 2928.27 2984.17 -950.04 2770.19 5956278.41 1520962.39 0.28 2144.28 ## 2931.17 7 76 1994.64 4589.32 92.67 5.62 4721,33 68.73 107.29 2962.82 3018.72 -976.07 2854.90 5956251.01 1521046.66 0.41 2211.07 ## 3019.78 81 2052.87 4684.43 93.05 5.64 4816,33 68.94 106.85 2997.12 3053.02 -1002.07 2939.58 5956223.63 1521130.90 0.49 2277.86 ## 3108.38 -63 2111.08 4779.43 93.51 5.66 4911.30 68.81 108.28 3031.35 3087.25 -1028.81 3024.04 5956195.53 1521214.91 1.41 2344.14 ## 3196.96 96 2169.85 4874.40 94.85 5.6$ 5007.65 68.93 107.75 3066.08 3121.98 -1056.60 3109.50 5956166.36 1521299.90 0.53 2410.92 ## 3286.84 -76 2230.00 4970.75 95.36 5.70 8102.79 68.35 107.95 3100.74 3156.64 -1083.76 3193.84 5956137.83 1521383.78 0.64 2476.92 ## 3375.44 162 2289.12 5065.89 95.97 5.72 5197.51 67.54 108.16 3136.30 3192.20 -1110.97 3277.31 5956109.27 1521466.79 0.88 2542.10 ## 3463.23 767 2347.92 5160.61 96.81 5.74 5292.94 68.41 108.69 3172.09 3227.99 -1138.93 3361.24 5956079.95 1521550.24 1.05 2607.40 ## 3551.69 30 2407.60 5256.04 97.80 5.76 5388.21 69.85 107.88 3206.03 3261.93 -1166.86 3445.76 5956050.66 1521634.29 1.71 2673.26 ## 3640.71 -28 2467.49 5351.31 99.43 5.78 5483.58 70.90 107.60 3238.06 3293.96 -1194.23 3531.32 5956021.90 1521719.39 1.14 2740.28 ## 3730.54 -14 2527.30 5446.68 100.51 5.80 5578.53 70.64 107.50 3269.33 3325.23 -122126 3616.80 5955993.49 1521804.41 0.29 2807.38 ## 3820.19 -160 2586.76 5541.63 100.79 5.81 5673,73 69.92 108.00 3301.46 3357.36 -1248.58 3702.15 5955964.79 1521889.30 0.90 2874.24 ## 3909.81 147 2646.43 5636.83 101.65 5.83 5769,12 69.40 108.55 3334.61 3390.51 -1276.63 3787.08 5955935.37 1521973.75 0.77 2940.42 ## 399915 135 2706.60 5732.22 102.38 5.84 5864.46 69.41 108.45 3368.15 3424.05 -1304.94 3871.71 5955905.68 1522057.91 0.10 3006.22 ## 4088.50 -84 2766.89 5827.56 102.48 5.86 5959.28 68.55 107.03 3402.16 3458.06 -1331.91 3956.01. 5955877.34 1522141.75 1.67 3072.26 ## 4177,00 -123 2825.82 5922.38 104.06 5.87 6054.31 68.88 106.57 3436.66 3492.56 -1357.51 4040.78 5955850.38 1522226.08 0.57 3139.29 ## 4265.55 -52 2883.68 6017,4] 104.60 5.89 6149.43 69.48 107.35 3470.47 3526.37 -1383.44 4125.82 5955823.06 1522310.68 0.99 3206.43 ## 4354.46 51 2941.96 6112.53 105.54 5.90 6244.70 69.45 108.05 3503.89 3559.79 -]410.57 4210.81 5955794.56 1522395.22 0.69 3273.04 ## 4443.68 93 3001.31 6207.80 106.20 5.92 6340.17 69.59 108.16 3537.29 3593.19 -]438.36 4295.82 5955765.39 1522479.75 0.18 3339.39 ## 4533.11 36 3061.27 6303.27 106.37 5.93 6433.19 68.95 107.73 3570.92 3626.82 -]465.74 4380.36 5955736.65 1522563.83 0.80 3405.49 ## 4621.98 -148 3120.68 6398.29 107.13 5.94 6530.42 67.80 109.14 3606.02 3661.92 -1493.73 4464.34 5955707.30 1522647.34 1.83 3470.83 ## 4710.51 132 3180.40 6493.52 108.87 ~ 5.96 6625.80 66.96 109.28 3642.71 3698.61 -1522.70 4547.48 5955676.98 1522729.99 0.89 3535.00 ## 4798.55 .7 i 3240.68 6588.90 109.72 5.97 6720.91 66.19 109.71 3680.52 3736.42 -1551.82 4629.75 5955646.53 1522811.77 0.91 3598.31 ## 8885.82 153 3300.75 6684.01 110.59 5.99 6815.75 65.92 109.86 3719.01 3774.91 -1581.16 4711.31 5955615.87 1522892.84 0.32 3660.88 ## 4972.50 153 3360.73 6778.85 110.89 6.00 6910.93 67.95 110.81 3756.30 3812.20 -161160 4793.42 5955584.11 1522974.43 232 3723.51 ## 5060.06 23 3421.93 6874.03 113.10 6.02 7006.07 69.26 111.18 3791.00 3846.90 -1643.34 4876.12 5955551.03 1523056.60 1.42 3786.15 ## 5148.65 15 3484.56 6969.17 114.46 6.03 7101.24 68.88 106,69 3825.01 3880.91 -1672.18 4960.17 5955520.83 1523140.16 4.42 3851.21 ## 5237.54 -96 3545.09 7064.34 118.67 6,06 7196.07 69.47 106.60 385893 3914.63 -]697.56 5045.09 5955494.07 1523224.65 0.63 3918.46 ## 5326.17 -8 3602.82 7159.17 119.26 6.07 7291.15 68.41 706.52 3892.89 3948.79 -1722.85 5130.14 5955467.40 1523309.27 1.12 3985.87 ## 5414.90 -176 3660.52 7254.25 120.33 6.08 7356.11 69.21 107.16 3927.22 3983.12 -1748.50 5214.88 5955440.38 1523393.58 1.05 4052-85 ## 5503.44 31 3718.42 7349.21 121.32 6.09 7481.36 69.13 104.54 3961.09 4016.99 -1772.82 5300.51 5955414.68 1523478.79 2.57 4121.19 ## 5592.46 -92 3775.46 7444.46 123.77 6.11 7576.34 69.07 10334 3994.98 4050.88 -1794.19 5386.63 5955391.91 1523564.54 1.18 4191.16 ## 5681.19 -93 3830.01 7539.44 124.90 6.12 7671.69 69.81 104.09 4028.46 4084.36 -1815.36 5473.36 5955369.33 1523650.91 1.07 4261.79 ## 5770.47 44 3884.63 7634.79 125.92 6.14 7766.87 68.88 704.13 4062.04 4117.94 -1837.07 5559.73 5955346.22 1523736.91 0.98 4331.86 ## 5859.53 178 3939.59 7729.97 126.85 6.15 7862.38 68.60 106.00 4096.67 4152.57 -1860.20 5645.68 5955321.70 1523822.46 L85 4400.97 ## 5948.54 99 3995.68 7825.48 128.61 6.16 7957.80 68.48 108.54 4131.59 4187.49 -1886.56 5730.47 5955293.97 1523906.81 2.48 4467.71 ## 6037.34 93 4054.25 7920.90 130.98 6.18 8053.14 69.53 109.45 4165.75 4221..65 -1915.54 5814.63 5955263.63 1523990.48 1.42 4532.81. ## 6126.35 39 4114.95 8016,24 132.33 6.19 8148.73 68.68 110.66 4199.84 4255.74 -1946.16 5898.52 595523 L65 1524073.85 1.48 4596.99 ## 6215.66 127 4177.05 8111.83 133.74 6.20 8243.70 69.13 111.87 4234.02 4289.92 -1978.29 5981.09 5955198.18 1524155.88 1.28 4659.35 ## 6304.26 68 423999 8206.80 134.96 6.21 8338.95 69.99 110.65 4267.29 4323.19 -2010.65 6064.26 5955164.48 1524238.51 LSO 4722.17 ## 6393.51 -53 4303.38 8302.05 136.39 6.23 8434,01 72.08 110.01 4298.18 4354.08 -2041.88 6148.56 5955131.88 1524322.28 2.29 4786.48 ## 6483.41 -76 4366.20 8397.11 138.57 6.24 8525.38 69.80 108.42 4329.00 4384.90 -2071.24 6232.77 5955101.16 1524406.00 2.89 485L47 ## 6572.60 -147 4427.27 8491.48 141.30 6.26 8624.08 68.35 108.34 4363.17 4419.07 -2099.43 6317.60 5955071.60 152449035 1.52 4917.50 ## 6661.98 -177 4487.52 8587.18 142.75 6.27 8719.33 67.61 109.01 4398.89 4454.79 -2127.70 6401.25 5955041.98 1524573.53 1.01 4982.42 d# 6750.29 140 4547.37 8682.43 143.71 6.28 8815.02 67.95 110.03 4435.07 4490.97 -2157.30 6484.74 5955011.03 1524656.52 1.05 5046.65 ## 6838.87 70 4608.37 8778.12 144.72 6.29 Meas. Incl. TRUE Subsea RKB Local ASP or Grid Dogleg Original ie ass uan.~~u~wn~.~ Tool Dist from Drilled T rdwsity o DD I Depth (ft) Angle (deg) Azi. (deg) TVD (ft) TW (R) N(+)/S(-) (ft) E(+)/W(-) (f[) N(+)/S(-) Lac (Y) E(+)/W(-) Dep. (X) Severity (°/100 ft) VS(66°) (ft) (6 (ft) 13444 (g) Face (deg) VS Plane (ft) Distance (ft) Comments ^~ ( ~ 2~~.57 p 6.96 8909.68 68.01 (10.14 4470.56 4526.46 -2187.44 6567.16 5954979.56 1524738.43 0.12 5109.69 ## 6926.62 60 4669.43 8872.78 144.84 6.30 9005.13 68.46 110.39 4505.96 4561.86 -2218.14 6650.32 5954947.51 1524821.07 0.53 5173.17 ## 7015.27 27 4731.30 8968.23 145.34 6.30 9100.35 68.61 109.99 4540.80 4596.70 -2248.72 6733.49 5954915.58 1524903.73 0.42 5236.71 ## 7103.89 -68 4793.07 9063.45 145.74 6.31 9195.23 68.48 109.35 4575.51 4631.41 -2278.45 6816.64 5954884.51 1524986.38 0.64 5300.58 ## 7192.19 -102 4854.04 9158.33 146.35 6.32 9290.27 68.49 109.25 4610.36 4666.26 -2307.67 6900.09 5954853.94 1525069.33 0.10 5364.93 ## 7280.61 -84 4914.68 9253.37 146.45 6.33 9385.53 69.00 108.15 4644.89 4700.79 -2336.13 6984.18 5954824.11 1525152.94 1.20 5430.18 ## 7369.39 -64 4974.89 9348.63 147.59 6.34 9480.98 69,85 107.93 4678.44 4734.34 -2363.81 7069.15 5954795.06 1525237.44 0.92 5496.54 ## 7458.75 -14 5034.73 9444.08 148.47 6.35 9575.95 69.47 107.92 4711.45 4767.35 -2391.21 7153.87 5954766.29 1525321.71 0.40 5562.80 ## 7547.80 -179 5094.22 9539.05 148.85 6.35 9671.15 69.19 107.36 4745.08 4800.95 -2418.20 7238.76 5954737.92 1525406.13 0.62 5629.36 ## 7636.87 -718 5153.41 9634.25 149.44 6.36 9766.33 69.26 107.16 4778.81 4834.71 -2444.61 7323.74 5954710.14 1525490.67 0.21 5696.26 ## 7725.86 -70 5212.10 9729.43 149.64 6.37 9861.28 68,80 107.42 4812.79 4868.69 -2470.96 7408.40 5954682.42 1525574.88 0.55 5762.88 ## 7814.52 152 5270.60 9824.38 150.16 6.38 9956.36 68.14 107.02 4847.69 4903.59 -2497.14 7492.88 5954654.87 1525658.91 0.80 5829.40 ## 7902.97 -151 5328.88 9919.46 150.92 6.38 10051.94 68.61 106.55 4882.91 4938.81 -2522.80 7577.94 5954627.83 1525743.54 0.67 5896.68 ## 7991.82 -43 5386.92 10015.04 151.56 6.39 10146.54 68.60 106.00 4917.5? 4973.43 -2547.56 7662.76 5954601.70 1525827.94 0.54 5964.09 ## 8080.18 -91 5444.04 10109.94 152.07 6.40 10241.62 68.62 105.99 4952.10 5008.00 -2571.88 7747.60 5954576.00 1525912.36 0.02 6031.70 ## 8168.43 -25 5500.76 10204.72 152.10 6.40 10336.98 67.88 1.05.69 4987.44 5043.34 -2596.06 7832.80 5954550.45 1525997.16 0.83 5099.71 ## 8257.00 -159 5557.51 10300.08 152.89 6.41 10432.05 68.73 106.15 5022.58 5078.48 -2620.29 7917.75 5954524.84 1526081.69 L00 6167.46 ## 8345.34 27 5614.19 10395.15 153.84 6.42 10527.41 68.09 106.20 5057.67 5113.57 -2644.99 8002.91 5954498.76 1526166.43 0.67 6235.21 ## 8434.01 176 5671.40 10490.51 154.48 6.43 10622.58 68.40 108.89 5092.95 5148.85 -2671.63 8087.18 5954470.75 1526250.25 2.65 6301.35 ## 8522.40 83 5730.01 10585.68 157.00 6.44 10717.44 68.61 109.47 5127.71 5183.61 -2700.63 8170.54 5954440.41 1526333.12 0.61 6365.72 ## 8610.66 69 5790.41 10680.54 157.58 6.4$ 10812.52 68.59 109.68 5162.40 5218.30 -2730.29 8253.95 5954409.40 1526416.03 0.21 6429.85 ## 8699.18 96 5851.43 10775.62 157.78 6.45 10907.77 68.68 108.23 5197.10 5253.00 -2759.10 8337.84 5954379.23 1526499.44 1.42 6494.77 ## 8787.89 -8G 5911.87 10870.87 159.13 6.46 11002.91 69.34 108.41 5231.18 5287.08 -2787.02 8422.17 5954349.94 1526583.29 0.72 6560.45 ## 8876.71 14 5971.68 10966.01 159.81 6.47 11097.75 68.03 108.42 5265.65 5321.55 -28]4.93 8505.99 5954320.68 1526666.64 1.38 6625.67 ## 8965.07 180 6031.27 11060.85 161.12 6.48 11192.93 6466 108.73 5300.00 5355.90 -2843.21 8590.13 5954291.04 1526750.30 1.74 6691.04 ## 9053.83 10 6091.32 11156.03 162.78 6.49 11288.05 68.27 108.40 5334.14 5390.04 -2871.48 8674.29 5954261.41 1526833.99 1.50 6756.42 ## 9142.61 -168 6151.38 11251.15 164,20 6.50 11383.52 69.14 107.84 5368.81 5424.71 -2899.14 8758.83 5954232.38 1526918.06 1.06 6822.40 ## 9231.56 -31 6211.03 11346.62 165.21 6.51 11478.74 68.75 107.99 5403.02 5458.92 -2926.47 8843.38 5954203.68 1527002.1.5 0.44 6888.53 ## 9320.42 160 6270.40 11441.84 165.63 6.$1 11573.88 68.29 107.67 5437.86 5493.76 -2953.58 8927.66 5954175.20 1527085.97 0.58 6954.49 ## 9408.95 - i 47 6329.44 11536.98 166.18 6.52 11669.14 68.62 107,76 5472.84 5528.74 -2980.54 9012.06 5954146.88 1527169.9L 0.36 7020.63 ## 9497.56 14 6388.40 11632.24 166.52 6.52 11764.10 67.41 109.11 5508.39 5564.29 -3008.38 9095.60 5954117.68 1527252.98 1.83 7085.62 ## 9585.61 134 6447.81 11727.20 168.26 6.53 11859.23 67.15 110.41 5545.14 5601.04 -3038.05 9178.18 5954086.68 1527335.06 1.29 7149.00 ## 9673.36 102 6508.50 11822.33 169.48 6.54 11954.11 68.02 109.39 5581.32 5637.22 -3067.90 9260.65 5954055.50 1527417.03 1.35 7212.20 ## 9761.07 -48 6569.31 11917.21 170.77 6.55 12049.25 68.40 108.87 5616.63 5672.53 -3096.85 9344.11 5954025.20 1527500.00 0.65 7276.67 ## 9849.41 -52 6629.71 12012.35 171.38 6.55 12144.41 68.46 108.49 5651.62 5707.52 -3125.19 9427.95 5953995.50 1527583.36 0.38 7341.73 ## 9937.91 -80 6689.70 12107.51 171.74 6.56 12239.83 68.16 106.91 5686.89 5742.79 -3152.15 9512.41 5953967.17 1527667.36 1.57 7407.92 ## 10026.57 -102 6748.68 12202.93 173,24 6.57 12335.04 68.09 107.36 5722.36 5778.26 -3178.18 9596.84 5953939.77 1527751.35 0.44 7474.47 ## 10114.92 100 6806.80 12298.14 173.66 6.57 12429.93 68.09 107.22 5757.77 5813.67 -3204.35 9680.90 5953912.25 1527834.97 0.14 7540.62 ## 10202.96 -90 6864.89 12393.03 173.79 6.58 12524.93 67.47 105.97 5793.69 5849.59 -3229.47 9765.18 5953885.76 1527918.82 1.38 7607.39 ## 10290.91 -118 6922.12 12488.03 175.11 6.$9 12618.87 65.31 100.66 5831.34 5887.24 -3249.31 9848.89 5953864.56 1528002.19 5.67 7675.80 ## 10376.98 -115 6974.30 12581.97 180.43 6.60 12668.26 65.32 98.68 5851.97 5907.87 -3256.85 9893.13 5953856.31 1528046.30 3.64 7713.14 ## 10421.85 -90 6999.18 12631.36 182.23 6.61 12715.53 65.26 97.07 5871.73 5927.63 -3262.73 9935.66 5953849.73 1528088.73 3.10 7749.61 ## 10464.80 ~~93 7021.85 12678.63 183.69 6.62 12811.44 64.85 93.87 5912.19 5968.09 -3271.02 10022.21 5953840.04 1528173.12 3.06 7825.30 ## 10551.76 -99 7064.63 12774.54 186.62 6.63 12905.78 64.71 90.00 5952.40 6008.30 -3273.91 10107.49 5953835.77 1528260.33 3.71 7902.03 ## 10637.11 -93 7101.95 12868.88 190.13 6.64 13000.92 65.28 86.81 5992.62 6048.52 -3271.50 10193.66 5953836.77 1528346.53 3.10 7981.73 ## 10723.33 -80 7134.80 12964.02 193.07 6.65 13095.83 64.15 81..29 6033.18 6089.08 -3262.63 10278.97 5953844.26 1528431.96 5.39 8063.28 ## 10809.14 -104 7161.40 13058.93 198.19 6.66 13142.69 64.03 79.22 6053.66 6109.56 -3255.50 10320.51 5953850.71 1528473.61 3.98 8104.13 ## 10851.29 -94 7171.77 13105.79 200.05 6.67 13190.89 64.30 76.86 6074.67 6130.57 -3246.51 10362.95 5953859.01 1528516.18 4.44 8146.55 ## 10894.68 -83 7180.82 13153.99 202.20 6.68 13286.34 64.22 72.42 6116.14 6172.04 -3223.74 10445.83 595388042 1528599.42 4.19 8231.52 ## 10980.65 -92 7193.73 13249.44 206.20 6.69 13381.99 62.87 67.25 6158.77 6214.67 -3194.26 10526.18 5953908.60 1528680.23 5.04 8316.92 ## 11066.29 -107 7199.45 13345.09 21 L02 6.70 13433.14 63.62 65.86 6181.80 6237.70 -3176.08 10568.08 5953926.08 1528722.42 2.84 8362.59 ## 11111.96 -59 7199.92 13396.24 212.47 6.71 13476.79 63.75 64.26 6201.15 6257.05 -3159.59 10603.56 5953942.00 1528758.15 3.30 8401.71 ## 11151.09 -85 7199.28 13439.89 213.91 6.71 Meas. Incl. TROE Subsea RI{B Local ASP or Grid Dogleg Original ie m,ms wain.. ~xv.~°..~ Tool Dist from Drilled Tot uasity t DDI Depth (ft) Angle (deg) Azi. (deg) TVD (k) TVD (f[) N(+)/S(-) (ft) E(+)/W(-) (ft) N(+)/S(-) Lat. (Y) E(+)/W(-) 0eµ (X) Severity (°/100 ft) VS(66°) (@) (6 (0) 13444 (H) Face (degJ VS Plane (R) Distance (R) Comments ^' ~~ } 29.7.7 6.96 13571.99 64.10 61.94 6243.00 6298.90 -3120.90 10679.81 5953979.44 1528835.02 2.22 8487.10 ## 11236.60 -81 7194.95 13535.09 216.02 6.72 13667.37 65.05 57.55 6283.97 6339.87 -3077.50 10754.18 1984021.62 1528910.08 4.27 8572.70 ## 11322.74 -77 7185.56 13630.47 220.10 6.73 13762.45 64.96 51.21 6324.17 6380.07 -3027.35 10824.19 5954070.62 1528980.89 6.04 8657.05 ## 11408.91 -92 7168.21 13725.55 225.84 6.74 13809.80 65.52 49.37 6344.01 6399.91 -2999.88 10857.26 .5954097.55 1529014.40 3.72 8699.44 ## 11451.91 -72 7156.57 13772.90 227.61 6.7$ 13857.89 65.81 46.56 6363.83 6419.73 -2970.54 10889.80 5954126.35 1529047.41 5.36 8740.10 ## 11495.73 -84 7143.00 13820.99 230.18 6.76 13905.93 66.34 44-83 6383.31 6439.21 -2939.87 10921.22 5954156.51 152907932 3.47 8781.28 ## 11539.64 -72 7127.77 13869.03 231.85 6.76 13953.18 66.36 44.50 640226 6458.16 -2909.09 10951.65 5954186.79 1529110.24 0.64 8821.60 ## 11582.92 -86 7112.02 13916.28 232.15 6.76 14048.68 66.41 43.15 6440.52 6496.42 -2845.96 11012.24 5954248.92 1529171.85 1.30 8902.62 ## 11670.42 -88 7078.99 14011.78 233.39 6.77 14143.96 67.03 39.94 6478.19 6534.09 -2780.46 11070.27 5954313 46 1529230.93 3.16 8982.28 ## 11757.95 -79 7042.76 14107.06 236.40 6.78 14238.60 68.23 36.80 6514.21 6570.11 -2711.85 11124.88 5954381.17 1529286.34 3.32 9059.80 ## 11845.46 -68 7002.17 14201.70 239.55 6.79 14333.53 68.56 30.67 6549.20 6605.10 -2638.49 11173.56 5954453.71 1529336.50 6.01 9134.38 ## 11933.72 -88 6955.08 14296.63 245.25 6.80 14382.11 68.36 30.14 6567.03 6622.93 -2599.52 11196.43 5954492.31 1529360.00 L10 9171.13 ## 11978.91 -112 6928.78 14345.21 245.79 6.81 14428.89 69.15 30.32 6583.98 6639.88 -2561.85 11218.38 5954529.61 1529382.56 1.73 9206.50 ## 12022.51 12 6903.29 14391.99 246.59 6.81 14523.87 70.69 27.58 6616.60 6672.50 -2483.91 11261.75 5954606.83 1529427.19 2.91 9277.82 ## 12111.71 -57 6849.73 14486.97 249.36 6.82 14619.03 71.88 26.99 6647.13 6703.03 -2403.92 11303.27 S954G86.13 1529470.00 1.53 9348.29 ## 12201.84 ~-35 6793.54 14582.13 250.81 6.82 14714.19 72.99 25.32 6675.85 6731.75 -2322,49 11343.26 5954766.89 1529511.30 2.04 9417.94 ## 12292.56 -55 6735.42 14677.29 252.75 6.83 14809.12 74.73 20.86 6702.25 6758.15 -2238.63 11378.99 5954850.16 1529548.40 4.87 9484.70 ## 12383.75 -69 6673.34 14772.22 257.38 6.$4 14904.28 75.11 18.25 6127.01 6782.91 -2152.05 11409.74 5954936.21 1529580.5.5 2.68 9548.00 ## 12475.63 -82 6606.76 14867.38 259.93 6.$$ 15000.20 76.19 15.54 6750.79 6806.69 -2063.14 11436.74 5955024.66 1529608.98 2.96 9608.83 ## 12568.56 -68 6536.52 14963.30 262.77 6.86 15095.46 77.96 10.65 6772.1 ] 6828.01 -1972.74 11457.76 5955114.70 1529631.46 5.34 9664.79 ## 12661.40 -70 6462.48 15058.56 267.85 6.87 15146.09 78.66 8.72 6782.37 6838.27 -1923.87 11466.10 5955163.43 1529640.59 3.98 9692.29 ## 12710.98 -70 6421.23 15109.19 269.86 6.88 15190.32 79.85 7.41 6790.61 6845.51 -1880.85 11472.19 5955206.34 1529647.39 3.96 9715.36 ## 12754.43 -47 6384.40 15153.42 271.62 6.89 15285.47 82.03 5.70 6805.59 6861.49 -1787.51 11482.91 8985299.49 1529659.62 2.90 9763.12 ## 12848.39 -38 6303.49 15248.57 274.38 6.90 15381.03 84.14 0.24 6817.11 6873.01 -1692.81 11487.81 5955394.08 1529666.07 6.09 9806.11 ## 12943.25 -69 6218.98 15344.13 280.]9 6.91 15434.42 84.77 358.01 6822.27 6878.17 -1639.68 11487.00 5955447.22 1529666.12 4.32 9826.98 ## 12996.39 -74 6170.11 15397.52 282.50 6.92 15476.25 85.08 357.03 6825.97 6881.87 -1598.06 11485.20 5955488.86 1529664.99 2.45 9842.26 ## 13038.06 -72 6131.35 15439.35 283.52 6.92 15571.33 84.96 352.14 6834.23 6890.13 -1503.79 11476.26 5955583.26 1529657.59 5.13 9872.44 ## 13132.78 -92 6041.59 15534.43 288.40 6.93 15625.14 85.82 350.62 6838.55 6894.45 -1450.76 1.1468.23 5955636.40 1529650.42 3.24 9886.67 ## -13186.41 -60 5989.88 15588.24 290.14 6.94- 15666.74 86.07 349.79 6841.49 6897.39 -1409.87 11461.17 595567740 1529644.02 2.08 9896.85 ## 13227.91 -73 5949.65 15629.84 291.00 6.94 15762.00 86.38 350.58 6847.77 6903.67 -1316.21 11444.96 5955771.30 1529629.34 0.89 9920.14 ## 13322.96 69 5857.50 15725.10 291.85 6.9$ 15855.23 84.83 351.31 6854.91 6910.81 -1224.41 11430.33 5955863.32 1529616.21 1.84 9944.11 ## 13415.91 155 5767.69 15818.33 293.56 6.96 15883.00 84.83 351.31 6857.41 6913.31 -1197.07 11426.15 5955890.72 1529612.48 0.00 9951,42 ## 13443.57 0 5741.02 15846.10 7" x 8-3/4" TD 293.57 6.96 i R n P i Bit Depth TVD 12-18-07 11:18:16 _.. _ . _ .. ----------------------- ~2C17 .u_~7l Gamma Ray Deep Resistivity Bulk Density apl ahm m gsoc 0.00 197A0 1 1i ~~ 1.~s~1_UO 2x33 ~ ii At Bit GammaRay ND Shallow Resistivity Neutron Porosity apl R ahm m p~ OA] 1~}.~xi 1 :380 1 10] 90iCU ------ 0~ __ }.~ _ ___ 6700 ____. ~ ~- ____. __ _ i 4 ~~ _` ~ - __- ~ ' ,• ~ __ _ - 6750 ------ ----- __'~. ~.4_ - _ _ - ~ - ~ `~ _ { ., ` c t _ ~ t :> .~ r '~_ , _- _ ~- -__ 6800 ____ ____.- _ _ 4 , _ ~ _ -_ r ~ ~ __y c ~ - _ L _ { _ _ 850 ~ v- ~.~ t 't _ -___. ____.- __~ __~ _ J ~ .~ t Top Kuparuk C (15,620' MD) LCU Nanuq (13365' MD) u Nanuq (13615' MD) Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA} Sent: Wednesday, December 19, 2007 9:06 AM To: 'Galiunas, Elizabeth C ;Davies, Stephen F (DOA} Ce: Alvord, Chip; Woods, Nina; Johnson, Vem(Halliburton Energy Services) Subject: RE: Sidetrack on CD4-301 (207-150} Liz, Regarding the plans to plugback and redrill, I have spoken to Commissioner Foerster and she approves of the plans. As noted in your conversation with Steve Davies yesterday afternoon, a new 401 will be needed with the new well name being CD4-301 A. Call or message with any questions. Tom Maunder, PE AOGCC From: Galiunas, Elizabeth C [mailto:Elizabeth.C.Galiunas@conooophtllips.oom] Sent: Tuesday, December 18, 2007 12:00 PM T©: Maunder, Thomas E (DOA); Davies, Stephen F (DOA) Cc: Alvord, Chip; Woods, Nina; Johnson, Vern(Halliburton Energy Services) Subject: Sidetrack on CD4-301 Tom/Steve, Page 1 of 1 As discussed earlier, the Kuparuk was not hydrocarbon bearing when we drilled through it this rooming. Attached is the log to show the tack of resistivity in the Kuparuk. Since there is no Kuparuk sand present, this interval will not be isolated. The log indicates the Nanuq sand is present and wilt be abandoned with +100' above and +100' below the interval at 13365' MD-13615' MD (according to Regulation 20 AAC 25.112.1.a}. A second cement plug will be placed to kick off at 10,000' and the well re-landed in the Kuparuk C sand. The isolation plug and the kickoff plug will be separated by mud. Currently it is not planned to tagged the isolation plug, provided no problems with the cement operations. Tomorrow a 10-403 Sundry will be submitted to the State with diagrams of the plugback operations and the sidetrack directional plan. Regards, Liz Galiunas Drilling Engineer .Alpine Drilling Team ConocoPlzillips Alaska AT0~17f)4 Office: (~J07)--2G5~G247 Cell: (907)~441~4871 12/19/2007 u op Kuparuk C (15,620' MD) LCU LJ lanuq (13365' MD) Nanuq (13615' MD) • i Maunder, Thomas E (DOA) From: Galiunas, Elizabeth C [Elizabeth.C.Galiunas@conocophiltips.com} Sent: Tuesday, December 18, 2007 4:45 PM To: Maunder, Thomas E (DOR}; Davies, Stephen F (DOA} Subject: CD4-301 NAD 27 Conversion Attachments: SIDETRACK PLAN.ppt Steve, Here is the NAD 27 conversion for the kick off paint, the heel, and the toe. X Y KOP: 385663.88 5954894.95 Heel: 387757.442 5959394.81 Toe: 386494.44 593095.495 Page 1 of 1 Taman-ow I will get the entire directional in NAD27 and send ~ to you both. Attached is also a slide showing where the sidetracked weal is in proximity to the existing TD. I.iz Galiunas Drilling Engineer Alpine Drilling Team ConocoPlzillips Alaska ATO--1704 Office: (907)~265~6247 Cell: (907)--4414871 i 12/19/2007 Page 1 of 1 ~Aaunder, Thomas E (DOA) From: Maunder, Thomas E (DOA} Sent: Tuesday, December 18, 2007 3:48 PM To: 'Gaiiunas, Elizabeth C'; Davies, Stephen F {DOA) Cc: 'Eggemeyer, Jerome C.'; 'Howard D Okland' Subject: RE: Correction CD4-301ST1wp05 Plan Summary Liz, To confirm our discussion, all directional information submitted to the Commission needs to be "NAD 27". Tom Maunder, PE AOGCC From: Gaiiunas, Elizabeth C [mailto:Elizabeth.C.Galiunas@conocophillips.cwn] Sent: Tuesday, December 18, 2~7 3:25 PM To: Maunder, Thomas E (DOA); Davies, Stephen F (DOA) Subject: Correction CD4-301STi.wp05 Plan Summary Tom/Steve, I realized the SSTVD and TVD were incorrect in the last PDF I sent. This is the conected copy. Please replace this foie with the previous one. Thanks, Liz Gaiiunas I2/19/2007 Maunder, Thomas E (DOA) From: Galiunas, Elizabeth C [Elizabeth.C.Galiunas@conocophillips.com] Sent: Tuesday, December 18, 2007 3:12 PM To: Maunder, Thomas E (DOA}; Davies, Stephen F (DOA} Subject: Sidetrack Directional Attachments: CD4-301ST1wp05 PtanSummary.pdf Tom/Steve, Page 1 of 1 Sorry this took so tang. Attached is the plan for the sidetrack with current surveys. This plan"s XY are beyond 500' of the planned XYs. f assume a 10-401 is needed to change the approved pr~ram along with the 10-403 to abandon the current well. Let me know if you need anything else. Liz Galiunas Drilling Engineer Alpine Drilling Team ConocoPhillips Alaska AT0~1704 Office: (907)~2G5rG247 Cell: (907)r441~4871 12!19/2007 Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Friday, November 30, 2007 2:17 PM To: 'Galiunas, Elizabeth C' Cc: Johnson, Vern(Halliburton Energy Services); Alvord, Chip; Noel, Brian; Woods, Nina; Boccanera, Justine Subject: RE: CD4-301 Update ~0`~- Liz, Thanks for the information. I will place a copy of this message in the file. Nothing further is needed. Tom Maunder, PE AOGCC From: Galiunas, Elizabeth C [mailto:Elizabeth.C.Galiunas@conocophillips.com] Sent: Friday, November 30, 2007 2:15 PM To: Maunder, Thomas E (DOA) Cc: Johnson, Vern(Halliburton Energy Services); Alvord, Chip; Noel, Brian; Woods, Nina; Boccanera, Justine Subject: CD4-301 Update Tom, To follow up on our conversation earlier, CD4-301 will be drilled next, predicted spud date of 12/14/2007, and due to time constraints with the ice road, the pilot hole will be dropped from the program. The well will TD at the same XYs. Although, the intermediate landing point has changed slightly due to dropping the pilot hole. Hopefully this will allow for completing the well and moving off to CD3 once the ice road is complete. Let me know if you have any comments or questions. Thanks, Liz Liz Galiunas Drilling Engineer Alpine Drilling Team Office: (907)-265-6247 Cell: (907)-441-4871 11 /30/2007 t ~ ~ SARAH PAL/N, GOVERNOR t~istl<-7~~ OIL ~ a7ra--7 333 W. 7th AVENUE, SUITE 100 CO1~T5ERQATIOP~IT COMI~IIS5IOI~T ANCHORAGE, ALASKA 99501-3539 C. Alvord PHONE (907) 279-1433 WNS Drilling Team Lead FAx (so7) 27sas4z ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Nanuq-Kuparuk Oil Pool, CD4-301 ConocoPhillips Alaska, Inc. Permit No: 207-150 Surface Location: 2882' FNL, 70' FEL, SEC. 24, T11N, R4E Bottomhole Location: 3585' FNL, 5047' FEL, SEC. 16, T11N, R5E Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. In accordance with 20 AAC 25.005(fl, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (CR CD4-301 PH) and API number (50-103-20557-70) from records, data and logs acquired for well CRU CD4-301. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a re esentative of the Commission to witness any required test, contact the Comm' si n's petroleum field inspector at (907) 659-3607 (pager). N .~- DATED this ~ day of ober, 200 cc: Department of ish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Page 1 of 1 Maunder, Thomas E (DOA) From: Galiunas, Elizabeth C [Elizabeth.C.Galiunas@conocophillips.com] Sent: Wednesday, October 31, 2007 6:02 AM To: Maunder, Thomas E (DOA); Johnson, Vern(Halliburton Energy Services) Subject: RE: CD4-301 Tom, I looked over the 401 and found that I did enter in the correct top of the liner. The top of the 3.5" liner should be 15474' MD / 6913' TVD. The correct tail cement calculation is 599 sacks. Sorry about the errors, Tom. Liz Galiunas From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov} Sent: Friday, October 26, 2007 5:43 PM To: Johnson, Vern; Galiunas, Elizabeth C Subject: CD4-301 Vern and Liz, I understand Liz is out. 1 am reviewing the application for CD4-301 and have a couple of questions. 1. It appears that the depths of the 3-1/2" liner are not correct on the 401. These depths do not agree with the drawing. 2. The 7" tail cement volume on the 401 does not appear to be correct. The calculation presented in the packet is correct, but they the sack count is reduced in the following section. If you could get back to me with the correct information, I can make the changes. Call or message with any questions. Tom Maunder, PE AOGCC 10/31 /2007 ~ ~~~~~~~ -~~~~ STATE OF ALASKA ~ OC T 2 5 2OO] ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL Alaska n'~ ~ Gas Cons, Commission 20 AAC Zs.ooS Anchorage 1a. Type of Work: 1b. Current Well Class: Exploratory ^ Development Oil ^ ' 1c. Specify if well is proposed for: Drill /^ - Re-drill ^ Stratigraphic Test ^ Service ^ Development Gas ^ Coalbed Methane ^ Gas Hydrates ^ Re-entry ^ Multiple Zone^ Single Zone ^ Shale Gas ^ 2. Operator Name: 5. Bond: ~ Blanket Single Well 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180. CD4-301/CD4-301 P61 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 21615' ~ TVD: 6892' Colville River Field 4a. Location of Well (Governmental Section): 7. Property Designation 3~~ ~ Z Surface: 2882 FNL, 70 FEL, Sec. 24 , T 11 N R 4 E ADL 380077, 384211, 372096 ~ Nanuq Kuparuk Oil Pool Top of Productive Horizon: 8. Land Use Permit: N •2G- 13. Approximate Spud Date: 4399 FNL, 4172 FEL, Sec. 21 , T 11 N R 5 E LAS2112 11/1112007 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3585' FNL, 5047 FEL, Sec. 16 , T 11 N R 5 E ~•o 5759 /mob Z 1.86 mi from ADL391002 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation ~~ .,.t„ ,'1 7~ 15. Distance to Nearest Well within Pool: Surface: x- 378174.73 ' y- 5957526.1 `Zone- 4 / &IkES iHei9ht above GL): 36.3 (ytSt_, 55.3 CD4-302 5206' at 17161' MD % 16. Deviated wells: Kickoff depth: 350 ft. 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.os5) Maximum Hole Angle: 90° deg Downhole: 3129 psig j Surface: 2429 psig ` 18. Casing Program if S ti Setting Depth Quantity of Cement Si pec ica ons T B tt ze om op o c. f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 24" 16" 62.5# H-40 WeEded 77 37 37 114 114` pre-installed 12.25" 9-518" 40# L-80 BTC 3038 37 37 3075 2400 496 sx AS Lite. 230 sx 15.8 G " " S~ ~~ 8.75 7 26# L-80 BTCM 15587 37 37 15624 6915 4 sx Class G, 187 Sx class G for K2 3.5" 9.3# L-80 EUE 15439 32 32 15471 6913 tubing 6.125" 3.5" 9.3# L-80 SLHT ~.i3' 8 21605 6892 Slotted Liner 19 PRESENT WELL CONDITION SUMMARY (~~~ (To d for Redrill and Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Casing Length Size Cement Volume MD ND Conductor/Stru ctu ra I Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Filing Fee ^ BOP Sketc f ^ Drilling Progrart^ Time v. Depth PI Shallow Hazard Analysi~ ' I ~I Property Plat ^ Diverter Sketct^ Seabed Report^ Drilling Fluid Prograrr^/ 20 AAC 25.050 requirement 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact L. Galiunas Printed Name C. Alvord Title WNS Drilling Team Lead Signature j~o,, ~i _ ~ -~,~ C, ~~'~,,,,,~ Phon265-602? Date t o(2,4.~.~ _ Commission Use Only Permit to Drill API Number: Permit Approval See cover letter Number: ~ 7~ ~S~ ~~ //~~ 50- /~ '~ ~ L.i/~~ Date: 11' 'O for other requirements Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbe d m/ethane, gas hydrates, or gas contained in shales: r -, Samples req'd: Yes ^ No L~ Mud log req'd: Yes ^ No Other. ~5~~ PS" `3~(~ ~CS~ H2S measures: Yes [] No D~ ection I svy req'd: Yes ~No ~"~'~Q~ APPROVED BY THE COMMISSION ~ ~ DATE: . _ ~ ~.. C M ISSIONER .,.. `.,. ConocoPhillips Alaska, Inc Post Office Box 100360 ~''~''~ Anchorage, Alaska 99510-0360 CUnaCOPhillipS Telephone 907-276-1215 October 24, 2007 ~ZE~EIVED Alaska Oil and Gas Conservation Commission ACT 2 ~ 2001 333 West 7th Avenue, Suite 100 Alaska Oii & Gas Cons. Commission Anchorage, Alaska 99501 Anchorage Re: Application for Permit to Drill CD4-301 &CD4-301 PB1 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore horizontal producer well from the Nanuq CD4 drilling pad. The intended spud date for this well is 11/11/2007. It is intended that Doyon Rig 19 be used to drill the well. CD4-301 is intended to be a horizontal Kuparuk C sand producer. However, the sand may not be thick enough to drill a horizontal. Therefore a pilot hole, CD4-301 PB1, will be drilled through the Kuparuk sand at 70° to verify if a horizontal well is feasible. The pilot hole will be abandoned with 2 plugs. Then the well, CD4-301, will be kicked off at approximately 11,200' MD and landed in the Kuparuk C sand horizontally. After setting 7" intermediate casing, the horizontal section will be drilled and the well completed as slotted liner producer. The well will be flowed back to mitigate formation damage and then be closed in '~ awaiting completion of well work for the well to begin production. CONTINGENCY PLAN: If the sand and pressures do not allow for a horizontal well, the intermediate °` casing will be run in the pilot hole. The well will be completed as a high angle slant and will be perforated before production. It is expected that both the K2 (Qannik) and the Nanuq sand will be considered a significant hydrocarbon bearing zone. The Nanuq will be cemented 500' above top of the sand. And for the Qannik, it is planned to pump lead cement, then open a stage toot and pump a second cement job to isolate the K2 with 500' of cement above and below the interval. This will leave a mud gap between the two stages. It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2) be granted. There have been 19 surface holes drilled at CD4 and there has not been a significant show of shallow gas or gas hydrates. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. A proposed drilling program 3. A drilling fluids program summary. 4. Proposed pilot hole schematic 5. Proposed completion diagram 6. Pressure information as required by 20 ACC 25.035 (d)(2). 7. CD4-301 Pilot Hole Cementing Requirements 8. Directional drilling /collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). ~~~~. ~ i 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Liz Galiunas at 265- 6247 or Chip Alvord at 265-6120. Sincerely, Liz Gali s Drilling Engineer Attachments cc: CD4-301 Well File /Sharon Allsup Drake ATO 1530 Chip Alvord ATO 1577 Vern Johnson ATO 1702 Jack Walker ATO 1740 Lanston Chin Kuukpik Corporation 02161NAL CD4-301 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 12-1 /4" Hole_/_9-5/8" Casing Interval Event Risk Level Miti ation Strate Conductor Broach Low. Monitor cellar continuous) Burin interval. Well Collision Low G ro sin le shots, travelin c tinder dia rams Gas Hydrates Low / Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud tem eratures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Abnormal Pressure in Low Increased mud weight Surface Formations i >2000' ND Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low densi cement slurries 8-3/4" Hole / 7" Casing Interval Event Risk Level Miti ation Strate Abnormal Pressure in low BOPE drills, Keep mud weight above 9.6 ppg. Surface Formations ~ Check for flow during connections and if needed, >2000' TVD increase mud wei ht. Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheolo ,lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted swee s. Abnormal Reservoir low Well control drills, increased mud weight. No Pressure mapped faults occur within 700' of the planned wellbore. Hydrogen Sulfide gas Low HZS drills, detection systems, alarms, standard well control ractices, mud scaven ers 6-1/8" Hole /Horizontal Production Hole Event Risk Level Miti ation Strate Lost circulation moderate Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheolo ,lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitorin ,wei hted swee s. Abnormal Reservoir Medium `~ BOPE drills, Keep mud weight above 8.8 ppg. Pressure Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud wei ht. Hydrogen Sulfide gas Low ,/ HzS drills, detection systems, alarms, standard well control ractices, mud scaven ers ORIGINAL Fiord : CD4-301 Procedure 1. Move on Doyon 19. 2. Drill 12-%" hole to the surface casing point as per the directional plan. (Directional/MWD). 3. Run and cement 9-5/8" surface casing. 4. Install and test BOPE to 3500 psi. 5. Pressure test casing to 3500 psi. 6. Drill out 20' of new hole. Perform leak off test. 7. Pick up and run in hole with 8-3/4" drilling BHA. v/' 8. Drill 8-3/4" hole to Pilot hole target in the Kuparuk C sand +/- 14855' MD. (LWD Program: GR/RES/DENS/NEUT/PWD) Plan for Horizontal Well 9.If sand is deemed thick enough and pressure indicates drilling a horizontal, plug back the pilot hole with 2 abandonment cement plugs. ,- . 10. Kick off cement plug with 8-3/4" drilling assembly at +/- 11200' MD. ~- 11. Drill 8-3/4" hole to intermediate casing point in the Kuparuk C sand. (LWD Program: GR/RES/PWD) 12. Run and cement 7" casing as per program. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 13. BOPE test to 3500 psi. 14. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.0 ppg EMW. 15. Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD). 16. Circulate the hole clean and. pull out of hole. 17. Run lower completion of 3-'h", 9.3# L-80 SLHT blank and slotted liner and liner hanger. 18. Run upper completion of 3-'/2, 9.3#, L-80 tubing with SSSV, packer, 3 GLMs with shear out valve in bottom mandrel, XN profile and wireline entry guide. Land hanger. 19. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 20. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 21. Shear valve in the gas lift mandrel. 22. Circulate tubing to diesel and install freeze protection in the annulus. 23. Drop ball and rod, set packer and test tubing and annulus to 3500 psi / 30 mins. 24. Set BPV and secure well. Move rig off. Post rig well work will include pulling the ball and rod assembly, and GLV change out. ORIGINAL ~ ~ CONTINGENCY PLAN: High Anale Slant Well 9. POOH and Run and cement 7" casing as per program. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 10. Run 3-%2, 9.3#, L-80 tubing with SSSV, packer, 3 GLMs with shear out valve in bottom mandrel, XN profile and wireline entry guide. Land hanger. 11. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 12. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 13. Circulate tubing to diesel and install freeze protection in the annulus. 14. Drop ball and rod, set packer and test tubing and annulus to 3500 psi / 30 mins. 15. Set BPV and secure well. Move rig off. Post rig well work for the high angle slant will include pulling the ball and rod assembly, GLV change out, and perforating the Kuparuk interval. OR161NA! Well Proximity Risks: Directional drilling /collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD4-302 is the nearest existing well to the CD4-301 plan with 8.6' well to well separation at 523' MD. Drilling Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. i Lost circulation: Faulting and low reservoir pressure within the Kuparuk reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumoina Operations: Incidental fluids developed from drilling operations on well CD4-301 will be injected into a permitted annulus ~~ on CD4 pad or the class 2 disposal well on CD1 pad. The CD4-301 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The significant hydrocarbon zones are the Nanuq, Kuparuk, and the Qannik reservoir. There will be 500' of cement fill above the top of the Nanuq and Qannik reservoirs. Upon completion of CD4-301 form 10-403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) " (0.052)'' (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052) * (2400') + 1,500 psi = 2998 psi Pore Pressure = 1,086 psi Therefore Differential = 2998 -1086 = 1912 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt (ppf) Grade Range Connection Type Collapse 85% of Collapse Burst 85% of Burst 9-5/8" 40 L-80 3 BTC 9,090 psi 1,717 psi 5,750 psi 2,992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi or~siNa~ • DRILLING FLUID PROGRAM SPUD to 9-5/8"surface casing oint - 12 %" Intermediate hole to 7" casing point - 8 3/<<" Production Hole Section - 6 1/8" Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg - 8.8 ppg PV --' 10 - 25 10 -15 YP 20 - 60 15 - 25 25 -30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10-15 10 minute gels <18 12-20 API Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 min NA HPHT Fluid Loss at 160 (drilling) 12-14 cc/30 min PH 8.5-9.0 9.0-10.0 9.0-9.5 KCL 6% Surface Hole: A standard high viscosity fresh water /gel spud mud is recommended for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel /polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section The horizontal production interval will be drilled with a M-I Flo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer and Dual-Flo starch will be used for viscosity and fluid loss control respectively. ORIGINAL Plug Back Completion Schematic RKB-GL=36.3' 9.8 ppg drilling mud i~ KOP 11,200' Updated 10/22/07 Sperry Sun Directional Plan WP02 ~ Wellhead 16" Conductor to 114' 18" 40 ppf J-80 BTCM Surface Casing 3075' MD / 2400' TVD emented to surface Plua #2:600' Kick off slug Ton at +/-11000' MD 17 ooa. Plug #2:600' Kick off plug Top at +l- 11600' MD 15.8 ooa. ~acvv y 30 bbls Hi Vis 4 400 ft 12600 Pill ~ mud 14255 To„p Kuparuk Reservoir at +/-146$8' MD ! 6912' TVD ,~~:: ~ ~ ~" 600 ft Plua #1 : +/- 600' Toa Cc0 +/-14255' MD ~~~~ `.~a3 ~~ dA~~ a, ~~$a~~ ~ 15.8 ooa Pilot Hole @ +/- 70 deg TD at +/- 14855' MD / 6969' TVD ~' QRIGINAL Completion Schematic Planned Sperry Sun 16" insulated Conductor to Directional Plan WPO2 114' 10122/07 2 Jts 4-''/2' 12.6 ppf L-80 IBT Mod Tubing 3-'/2' X 4-'/" Cross over '2.813" TRMAXX-5E SSSV 9-5/8" 40 ppf L-80 BTCM Surface Casing 3075' MD / 2400' TVD 3 Yi' 9.3 ppf L-80 EUE Mod Tubing Uooe r Com lei tion: Tou MD T / 7 <,: ~ Item Cement to +/- 6922' 1) Tubing Hanger 32' 32' MD / 3872' TVD 2) 4-''/z' 12.6 #/ft IBT-Mod Tubing 2 jts 3) 3-'/" X 4 '/° Crossover 4) 3 '/~' 9.3 #/ft EUE-M Tubing Qannik interval top +/- 5) Camco TRMAXX SCSSSV W/ X profile (2.812") 2200' 1990' ,. ! 7422' MD 14064' TVD 6) 3-'/~' 9.3 #!ft EUE-M Tubing Stage 7) Camco KBMG GLM 5686' 3400' cementing tool 8) 3-''/i' 9.3 #/ft EUE-M Tubing ' ' +/- 7960' MD / 9) Camco KBMG GLM 11433 5600 10) 3-''/Z' 9.3 #/ft EUE-M Tubing 4270' TVD 11) Camco KBMG GLM 12840' 6148' With DCk-2 shear out valve (pinned for 3000 psi) 12) 3 Y~' 9.3 #/ft EUE-M Tubing (2) 13) Baker Premier Packer 12920' 6181' 14) 3 ''/i' 9.3 #/ft EUE-M Tubing (2) 15) HES "XN" (2.725 Min ID")- 65° inc 13000' 6214' 16) 3 '/2' 9.3 #/ft EUE-M Tubing 17) BOT Stinger w/fluted WLEG/ pup/shear sub 15457' 6912' 3' space out above top of liner Lower Comoletion: Too MD TVD Item 9 `- F, 18) Baker 5" x 7" Flexlock Liner Hanger 15474' 6913' 19) 3 '/i', 9.3#/ft, SLHT Tubing +/- 3 jts 20) 3 '/z' 9.3 #/ft, SLHT liner w! blank across shale 21 and slots across sand B k Sh 21605' 6892' ./ ) a er oe Top of cement 12405' MD / 5972' TVD ~`~ 3 Y~' 9.3#/tt L-80 SLHT Mod Slotted liner Pattern: (+/- 500' above Nanuq) ~~'`-~ -- -,~ 8 slots / ft, 2-'/." x 1/8"slots Top Reservoir at +/- Nanuq 12905' MD / 6175' TVD Kuparuk 15625' MD / 6912' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ +/-90° 15624' MD, 6915' TVD TD 6-1 /8" hole 21615' MD / 6892' TVD ~" OR!uINAL • • CD4-301 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 (c) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well Casing Size in Csg Setting Depth MD/TVD ft Fracture Gradient lbs. / al Pore pressure si ASP Drilling si 16 114 / 114 10.9 52 53 9 5/8 3075 / 2400 14.5 1086 1570 7" / TD 15624 / 6915 16.0 3129 2429 N/A 21615 / 6892 16.0 3118 N/A NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1 ]D Where: ASP =Anticipated Surface pressure in psi FG =Fracture gradient at the casing seat in Ib/gal 0.052 =Conversion from Ib./gal to psi/ft 0.1 =Gas gradient in psi/ft D =true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP - (0.1 x D) Where; FPP =Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D =[(10.9x0.052)-0.1]x114=53 psi OR ASP =FPP - (0.1 x D) = 1086 - (0.1 x 2400') = 846 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1] D _ [(14.5 x 0.052) - 0.1] x 2400 = 1570 psi OR ASP =FPP - (0.1 x D) = 3129 - (0.1 x 6915') = 2437 psi 3. Drilling below intermediate casing (7") ASP =FPP - (0.1 x D) = 3118 - (0.1 x 6892) = 2429 psi ~' ORIGINAL ~ ! Cementing Program: 9 5/8" Surface Casing run to 3075' MD / 2400' TVD. Cement from 3075' MD to 2575' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2575' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost (1386' MD). Lead slurry: (2575'-1386') X 0.3132 ft3/ft X 1.5 (50% excess) = 558.6 ft3 below permafrost 1386' X 0.3132 ft3/ft X 4 (300% excess) = 1736.3 ft3 above permafrost Total volume = 558.6 + 1736.3 = 2294.9 ft3 => 496 Sx @ 4.63 ft3/sk System: 496 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.63 ft3/sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124 extender and 9% BWOWI D044 freeze suppressant Tail slurry: 500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume 80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk System: 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S001 accelerator @ 15.8 PPG yielding 1.17 ft3/sk Pilot Hole Cementing Requirements Cement Plug #l: 14855' MD to 14255' MD = 600' Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.41758 ft3~ft X 1.15 (15% excess) = 288 ft3 annular vol. ~ 250 Sx @ 1.16 ft3/sk. Cement Plug #2: 12200' MD to 11600' MD = 600' Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.41758 ft3~ft X 1.15 (15% excess) = 288.1 ft3 annular vol. ~ 250 Sx @ 1.16 ft3/sk. Cement Plug #3: 11600' MD to 11000' MD = 600' Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 600' X 0.41758 ft3~ft X 1.15 (15% excess) = 288 ft3 annular vol. ~ 288 Sx @ 1.0 ft3/sk. 7" Intermediate Casing run to 15624' MD / 6915' TVD Cement from 15624' MD to 12405 +/-' MD (minimum 500' 1VID above top of Nanuq reservoir) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Tail: (15624' -12405') X 0.1503 ft3/ft X 1.4 (40% excess) = 677.3 ft3 annular vol. 80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume Total volume = 677.3 + 17.2 = 694 ft3 => 599 Sx @ 1.16 ft3/sk ~~~ -~1 ~~c~~ System: ~ x Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18% D 167 fluid loss additive @ 15.8 PPG yielding 1.16 ft3/sk ' By Weight Of mix Water, all other additives a 1 Second Stage: Cement from ports in a ES stage collar set 500' below the K2 interval to +/- 500' above the K2 interval with Class G + additives @ 15.8 ppg. Assume 40% excess annular volume Lead: (7960'- 6922') X 0.1503 ft3/ft X 1.4 (40% excess) = 218.4 ft3 annular vol. Total Volume = 218.4 ft3 => 187 Sk @ 1.17 ft3/sk System: 187 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% 5002 accelerator @ 15.8 PPG yielding 1.17 ft3/sk ORIGINAL ~nocoPhillips Alaska, I~- CPAI Plan Report OCT 2 ~ 2007 Company: ConocoPhllips Alaska Inc: Date: 9/17/2007 Timr. 16:50:06 ~^ P~ OfilIFp15SI Field: Colville River Unit Co-ordinate(NE) licfcrcncc: Well: Plan: CD4-301I+~-u~0~ Site: Nanuq CD4 Vertical (TVD} Reference: Plan: CD4-301 (36.3+19) 55.3 Well: Plan; CD4-301 Section (VS) Reference: Well (O.OON,O.OOE,66.OOAzi) Wellpath: Plan: CD4-301 Survey Calculation Method: Minimum Curvature Db: Oracle: Plan: CD4-301wp02 Date Composed: 9/5/2007 Version: 6 Principal: Yes Tied-to: From: Definitive Path Field: Colville River Unit North Slope Alaska United States Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: Nanuq CD4 Site Position: Northing: 5957526.10 ft Latitude: 70 17 32.966 N From: Map Easting: 378174.70 ft Longitude: 150 59 10.763 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: -0.93 deg Well: Plan: CD4-301 Slot Name: Well Position: +N/-S 0.02 ft Northing: 5957526.12 ft Latitude: 70 17 32.966 N +E/-W 0.03 ft Easting : 378174.73 ft Longitude: 150 59 10.762 W Position Uncertainty: 0.00 ft Wellpath: Plan: CD4-301 Drilled From: Plan: CD4-301ST1 Tie-on Depth: 11200.00 ft Current Datum: Plan: CD4-301 (36.3+19) Height 55.30 ft Above System Datum: Mean Sea Level Magnetic Data: 12/1/2004 Declination: 23.78 deg Field Strength: 57492 nT Mag Dip Angle: 80.60 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.30 0.00 0.00 66.00 Survey Program for Definitive Wellpath Date: 9/5/2007 Validated: No Version: 4 Actual From To Survey Toolcode Tool Name ft ft Plan Section Information MD Incl Azim TVD +N/-S +EJ-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/1OOft deg 11200.00 67.49 107.98 5510.09 -2798.79 8535.03 0.00 0.00 0.00 0.00 12729.24 66.99 49.52 6148.79 -2540.94 9838.47 3.50 -0.03 -3.82 -102.70 14602.11 66.99 49.52 6880.80 -1421.92 11149.80 0.00 0.00 0.00 0:00 14688.04 70.00 49.52 6912.30 -1370.03 11210.61 3.50 3.50 0.00 -0.08 CD4-301wp02 T1 South 14705.58 70.00 49.52 6918.30 -1359.33 11223.14 0.00 0.00 0.00 0.00 14855.58 70.00 49.52 6969.60 -1267.82 11330.36 0.00 0.00 0.00 0.00 Nai Pla ~nocoPhillips Alaska, I~ CPAI Plan Report Company: ConocoPhillipsAlaskalnc. Date: 9!17/2007 Time: 16:50:06 Page: 2' Field: Colville River Unit Caordinate(NE} Reference: Well: Plan: CD4-301, True North Site: Nanuq CD4 Vertical (TVD) Reference: ` Pla n: CD4-301 (36.3+19) 55.3 Well: Plan:. CD4-301'' Section (VS) Reference: We ll {O .OON,O.OOE;66.OOAzi) V~'ellpath: Plan: GD4-301 Survey Calculation Method: Minimu m Curvatu re:. Db: Oracle Survey MD Intl Azim TVD Sys TVD N/S E/W MapN MapE DLS TFO Comme t ft deg deg ft ft ft ft ft ft degl100ft deg 350.00 0 .00 0. 00 350 .00 294.70 0.00 0.00 5957526. 12 378174. 73 0.00 0 .00 KOP 3075.74 67 .49 107. 98 2400 .00 2344.70 -482.08 1396.13 5957021. 52 379562. 75 2.48 0 .00 9 5/8" x 12 1 /4" 11200.00 67 .49 107. 98 5510 .09 5454.79 -2798.79 8535.03 5954589. 62 386662. 57 0.00 0 .00 11300.00 66 .77 104. 26 5548 .97 5493.67 -2824.37 8623.52 5954562. 61 386750. 63 3.50 257 .30 11400.00 66 .13 100. 51 5588 .94 5533.64 -2844.04 8713.03 5954541. 50 386839. 80 3.50 258 .75 11500.00 65 .58 96. 72 5629 .86 5574.56 -2857.71 8803.23 5954526. 37 386929. 76 3.50 260 .25 11600.00 65 .13 92. 90 5671 .57 5616.27 -2865.34 8893.77 5954517. 28 387020. 17 3.50 261 .80 11700.00 64 .78 89. 06 5713 .92 5658.62 -2866.89 8984.33 5954514. 26 387110. 68 3.50 263 .39 11800.00 64 .52 85. 19 5756 .75 5701.45 -2862.36 9074.57 5954517. 32 387200. 97 3.50 265 .02 11900.00 64 .37 81. 32 5799 .90 5744.60 -2851.78 9164.14 5954526. 45 387290. 69 3.50 266 .67 12000.00 64 .32 77. 44 5843 .20 5787.90 -2835.16 9252.71 5954541. 63 387379. 52 3.50 268 .35 12100.00 64 .37 73. 55 5886 .51 5831.21 -2812.59 9339.96 5954562. 78 387467. 11 3.50 270 .03 12200.00 64 .53 69. 68 5929 .65 5874.35 -2784.14 9425.56 5954589. 84 387553. 15 3.50 271 .71 12300.00 64 .79 65. 82 5972 .47 5917.17 -2749.92 9509.18 5954622. 69 387637. 31 3.50 273 .38 12400.00 65 .14 61. 97 6014 .80 5959.50 -2710.06 9590.52 5954661. 23 387719. 27 3.50 275 .03 12500.00 65 .60 58. 16 6056 .48 6001.18 -2664.71 9669.27 5954705. 30 387798. 74 3.50 276 .66 12600.00 66 .15 54. 37 6097 .37 6042.07 -2614.02 9745.14 5954754. 74 387875. 42 3.50 278 .25 12700.00 66 .79 50. 61 6137 .31 6082.01 -2558.21 9817.85 5954809. 37 387949. 02 3.50 279 .80 12729.24 66 .99 49. 52 6148 .79 6093.49 -2540.94 9838.47 5954826. 29 387969. 91. 3.50 281 .30 12800.00 66 .99 49. 52 6176 .45 6121.15 -2498.67 9888.01 5954867. 76 388020. 13 0.00 180 .00 12900.00 66 .99 49. 52 6215 .53 6160.23 -2438.92 9958.03 5954926. 36 388091. 10 0.00 180 .00 13000.00 66 .99 49. 52 6254 .62 6199.32 -2379.17 10028.05 5954984. 96 388162. 07 0.00 180 .00 13100.00 66 .99 49. 52 6293 .70 6238.40 -2319.42 10098.06 5955043. 56 388233. 04 0.00 180 .00 13200.00 66 .99 49. 52 6332 .79 6277.49 -2259.67 10168.08 5955102. 16 388304. 01 0.00 180 .00 13300.00 66 .99 49. 52 6371 .87 6316.57 -2199.92 10238.10 5955160. 76 388374. 98 0.00 180 .00 13400.00 66 .99 49. 52 6410 .96 6355.66 -2140.17 10308.11 5955219. 37 388445. 95 0.00 180 .00 13500.00 66 .99 49. 52 6450 .04 6394.74 -2080.42 10378.13 5955277. 97 388516. 92 0.00 180 .00 13600.00 66 .99 49. 52 6489 .13 6433.83 -2020.67 10448.15 5955336. 57 388587. 89 0.00 180 .00 13700.00 66 .99 49. 52 6528 .21 6472.91 -1960.93 10518.17 5955395. 17 388658. 86 0.00 180 .00 13800.00 66 .99 49. 52 6567 .30 6512.00 -1901.18 10588.18 5955453. 77 388729. 83 0.00 180 .00 13900.00 66 .99 49. 52 6606 .38 6551.08 -1841.43 10658.20 5955512. 37 388800. 80 0.00 180 .00 14000.00 66 .99 49. 52 6645 .47 6590.17 -1781.68 10728.22 5955570. 98 388871. 78 0.00 180 .00 14100.00 66 .99 49. 52 6684 .55 6629.25 -1721.93 10798.23 5955629. 58 388942. 75 0.00 180 .00 14200.00 66 .99 49. 52 6723 .64 6668.34 -1662.18 10868.25 5955688. 18 389013. 72 0.00 180 .00 14300.00 66 .99 49. 52 6762 .72 6707.42 -1602.43 10938.27 5955746. 78 389084. 69 0.00 180 .00 14400.00 66 .99 49. 52 6801 .81 6746.51 -1542.68 11008.29 5955805. 38 389155. 66 0.00 180 .00 14500.00 66 .99 49. 52 6840 .89 6785.59 -1482.93 11078.30 5955863. 98 389226. 63 0.00 180 .00 14600.00 66 .99 49. 52 6879 .98 6824.68 -1423.18 11148.32 5955922. 59 389297. 60 0.00 180 .00 14602.11 66 .99 49. 52 6880 .80 6825.50 -1421.92 11149.80 5955923. 82 389299. 10 0.00 180 .00 14688.04 70 .00 49. 52 6912 .30 6857.00 -1370.03 11210.61 5955974. 72 389360. 73 3.50 359 .92 CD4-301wp02 T 14700.00 70 .00 49. 52 6916 .39 6861.09 -1362.73 11219.15 5955981. 87 389369. 39 0.00 0 .00 14705.58 70 .00 49. 52 6918 .30 6863.00 -1359.33 11223.14 5955985. 22 389373. 44 0.00 0 .00 LCU 14800.00 70 .00 49. 52 6950 .59 6895.29 -1301.73 11290.63 5956041. 71 389441. 84 0.00 0 .00 14855.58 70 .00 49. 52 6969 .60 6914.30 -1267.82 11330.36 5956074. 96 389482. 11 0.00 0 .00 7"x 8 3/4" Targets `Map Map <--- Latitude ----> ' <--- Longitude -> Name Description TVD +N/-S +E/-W Northing >',asting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft CD4-30 1wp02 T1 South 6912.30 -1 370.03 11210.61 5955974.72 389360.73 70 17 19.409 N 150 53 44.119 W -Plan hit target youth QR!G1I~-AL ~nocoPhillips Alaska, Ir~ CPAI Plan Report Company:. ConocoPhillipsAtaaka tnc. - Date: 9/17/2Q07 Time: 16:50:06 Page: 3 Field: Colville River Unit Co-ordinate(NE) Reference: Well; Plan: CQ4-301, True North Site: Nanuq CD4 Vertical (TVD) Reference: Plan: CD4-301 (36.3+19) 55.3 Well: Plan: GD4-301 Section (VS) Reference: Well (O.OON,O.OOE,66.OOAzi) VVellpath: Plan: CD4=301':. Survey Calculation Method: Minimum Curvature Db: Oracle Annotation ~1D TVD ft tt 350.00 350.00 KOP Casing Points MD TVD Diameter Hole Size Name ft ft in in 3075.74 2400.00 9.625 12.250 9 5/8" x 12 1/4" 14855.58 6969.60 7.000 8.750 7"x 8 3/4" Formations NID TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg - - - 14688.04 6912.30 Kuparuk C - 0.00 0.00 14705.58 6918.30 LCU 0.00 0.00 ORIGIN41_ ~nocoPhillips Alaska, I~ Anticollision Report Company: ConocoPhillips Alaska InC. Date: 9/17/2007 Time: 16:54:37 Page: 1 Field: Colville River Unit Reference Site: Nanuq CD4 Co-ordinate(NE) Reference: Well: Pla n: CD4-301, True North Reference W ell: Plan: CD4-301 Vertical (T VD) Refere nce: Plan: CD4-301 (36.3+19) 55.3 Reference W ellpath: Plan: CD4-301 Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Plan: CD4-301wp02 & NOT PLANNED P Interpolatio n Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 36.30 to 14855.5 8 ft Scan Method: Trav Cylinder No rth Maximum Radius: 1 681.93 ft Error Surface: Ellipse + Casing Casing Points -- __ - IVH) 'I'VD Diameter 'Hole Size Name I ft ft in in 3075.74 2400.00 9.625 12.250 9 5/8" x 12 1/4" 14855.58 6969.60 7.000 8.750 7"x 8 3/4" Plan: CD4-30 1wp02 Date Composed: 9/5/2007 Version: 6 Principal: Yes Tied-to: From: Definitive Path Summary - <---------------------- Offset Wellpath --------------------> Reference Offset __ Ctr-Ctr No-Go Allowable ~ Site Well Wellpath MD MD llistance Area Deviation Warning ft ft ft ft ft Nanuq CD4 Plan: CD4-30 1 Plan: CD4-301ST1 V1 PI 1 1225.00 11225.00 0.19 334.56 -334.37 FAIL: Major Risk Site: Nanuq CD4 Well: Plan: CD4-301 Rule Assigned: Major Risk Wellpath: Plan: CD4-301ST1 V1 Plan: CD4-301ST1 ~ wp01 V5 Inter-Site Error: 0.00 ft Reference Offse t Semi-Major Axis Ctr-Ctr iVo-Go Allowable IVH) TVD MD 'Iti'D Ref Offset TFO+A ZI TFO-HS Casing/H Snistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 36.30 36.30 36.30 36.30 0.00 0.00 0.00 0.00 12.250 0.00 1.02 -1.02 FAIL 50.00 50.00 50.00 50.00 0.02 0.02 0.00 0.00 12.250 0.00 1.24 -1.24 FAIL 75.00 75.00 75.00 75.00 0.04 0.04 0.00 0.00 12.250 0.00 1.63 -1.63 FAIL 100.00 100.00 100.00 100.00 0.07 0.07 0.00 0.00 12.250 0.00 2.03 -2.03 FAIL 125.00 125.00 125.00 125.00 0.13 0.13 0.00 0.00 12.250 0.00 2.57 -2.57 FAIL 150.00 150.00 150.00 150.00 0.19 0.19 0.00 0.00 12.250 0.00 3.12 -3.12 FAIL 175.00 175.00 175.00 175.00 0.24 0.24 0.00 0.00 12.250 0.00 3.66 -3.66 FAIL 200.00 200.00 200.00 200.00 0.30 0.30 0.00 0.00 12.250 0.00 4.20 -4.20 FAIL 225.00 225.00 225.00 225.00 0.36 0.36 0.00 0.00 12.250 0.00 4.74 -4.74 FAIL 250.00 250.00 250.00 250.00 0.41 0.41 0.00 0.00 12.250 0.00 5.29 -5.29 FAIL 275.00 275.00 275.00 275.00 0.47 0.47 0.00 0.00 12.250 0.00 5.83 -5.83 FAIL 300.00 300.00 300.00 300.00 0.53 0.53 0.00 0.00 12.250 0.00 6.37 -6.37 FAIL 325.00 325.00 325.00 325.00 0.58 0.58 0.00 0.00 12.250 0.00 6.91 -6.91 FAIL 350.00 350.00 350.00 350.00 0.64 0.64 0.00 0.00 12.250 0.00 7.46 -7.46 FAIL 375.00 375.00 375.00 375.00 0.66 0.66 115.00 0.00 12.250 0.00 7.80 -7.80 FAIL 400.00 400.00 400.00 400.00 0.67 0.67 115.00 0.00 12.250 0.00 8.14 -8.14 FAIL 425.00 424.99 425.00 424.99 0.66 0.66 115.00 0.00 12.250 0.00 8.33 -8.33 FAIL 450.00 449.98 450.00 449.98 0.65 0.65 115.00 0.00 12.250 0.00 8.53 -8.53 FAIL 475.00 474.96 475.00 474.96 0.64 0.64 115.00 0.00 12.250 0.00 8.72 -8.72 FAIL 500.00 499.93 500.00 499.93 0.63 0.63 115.00 0.00 12.250 0.00 8.92 -8.92 FAIL 525.00 524.89 525.00 524.89 0.64 0.64 115.00 0.00 12.250 0.00 9.22 -9.22 FAIL 550.00 549.81 550.00 549.84 0.65 0.65 295.00 180.00 12.250 0.44 9.50 -9.06 FAIL 575.00 574.77 575.00 574.77 0.66 0.66 115.00 0.00 12.250 0.00 9.82 -9.82 FAIL 600.00 599.68 600.00 599.68 0.67 0.67 115.00 0.00 12.250 0.00 10.12 -10.12 FAIL 625.00 624.58 625.00 624.58 0.70 0.70 115.00 0.00 12.250 0.00 10.51 -10.51 FAIL 650.00 649.45 650.00 649.45 0.73 0.73 115.00 0.00 12.250 0.00 10.91 -10.91 FAIL 675.00 674.30 675.00 674.30 0.77 0.77 115.00 0.00 12.250 0.00 11.30 -11.30 FAIL 700.00 699.13 700.00 699.13 0.80 0.80 115.00 0.00 12.250 0.00 11.70 -11.70 FAIL 725.00 723.93 725.00 723.93 0.84 0.84 115.00 0.00 12.250 0.00 12.16 -12.16 FAIL 750.00 748.70 750.00 748.70 0.89 0.89 115.00 0.00 12.250 0.00 12.62 -12.62 FAIL )GRAI1 C?RPt,~n~~~ ~nocoPhillips Alaska, In~ Anticollision Report Company: ConocoPhillipsAlaska Inc. Date: 9/17/2007 Time: 17:03:59 Page: 1 Field: Colville River Unit Reference Site: Nanuq CD4 Co-ordinate(NE) Reference: Well: Pian: CD4-301, True North Reference W e{I: PIaR: CD4-301 Vertical (TV D) Refere nce: Plan: CD4-301 (36.3+19) 55.3 Reference Wellpath: Plan: CD4-301 Db: Oracle GLOBAL SCAN APPLIED: All wel lpaths within 200'+ 100/1000 of reference Reference: Plan: CD4-301wp02 & NOT PLANNED P Interpolatio n Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Rang e: 36.30 to 14855.58 ft Scan Method: Trav Cylinder North Maximum Radius: 1681.93 ft Error Surface: Ellipse + Casing Casing Points MD TVD Diameter Ho le Size Name ft ft in in 3075.74 2400.00 9.625 12.250 9 5/8" x 12 1 /4" - - -- -_ 14855.58 6969.60 7.000 8.750 7"x 8 3/4" Plan: CD4-301wp02 Date Composed: 9/5/2007 Version: 6 Principal: Yes Tied-to: From: Defin itive Path Summary -- - - <------------ _ --- Off'setWellpath -------- -------> Reference - Offset Ctr-Ctr No-Go Allowable ~ ~, Site Well Wellpath MD b1D Distance Area Deviation Warning 'ft ft ft ft ft Nanuq CD4 Plan: CD4-30 1 Plan: CD4-301ST1 V1 PI 1 1200.00 1 1200.00 0.00 32.53 -32.53 FAIL: Minor 1/200 Site: Nanuq CD4 Well: Plan: CD4-301 Rule Assigned: Minor 1/2 00 Wellpath: Plan: CD4-301ST1 V1 Plan: CD4-301ST1 -- wp01 V5 Inter-Site Error: - 0.00 ft Reference Offset Semi-M~for Axis - Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H Sflistance Area Deviation Warning ft ft ft ft ft ft deg deg. in ft ft ft 36.30 36.30 36.30 36.30 0.00 0.00 0.00 0.00 12.250 0.00 1.02 -1.02 FAIL 50.00 50.00 50.00 50.00 0.02 0.02 0.00 0.00 12.250 0.00 1.17 -1.17 FAIL 75.00 75.00 75.00 75.00 0.04 0.04 0.00 0.00 12.250 0.00 1.29 -1.29 FAIL 100.00 100.00 100.00 100.00 0.07 0.07 0.00 0.00 12.250 0.00 1.39 -1.39 FAIL 125.00 125.00 125.00 125.00 0.13 0.13 0.00 0.00 12.250 0.00 1.74 -1.74 FAIL 150.00 150.00 150.00 150.00 0.19 0.19 0.00 0.00 12.250 0.00 1.98 -1.98 FAIL 175.00 175.00 175.00 175.00 0.24 0.24 0.00 0.00 12.250 0.00 2.20 -2.20 FAIL 200.00 200.00 200.00 200.00 0.30 0.30 0.00 0.00 12.250 0.00 2.39 -2.39 FAIL 225.00 225.00 225.00 225.00 0.36 0.36 0.00 0.00 12.250 0.00 2.65 -2.65 FAIL 250.00 250.00 250.00 250.00 0.41 0.41 0.00 0.00 12.250 0.00 2.89 -2.89 FAIL 275.00 275.00 275.00 275.00 0.47 0.47 0.00 0.00 12.250 0.00 3.10 -3.10 FAIL 300.00 300.00 300.00 300.00 0.53 0.53 0.00 0.00 12.250 0.00 3.30 -3.30 FAIL 325.00 325.00 325.00 325.00 0.58 0.58 0.00 0.00 12.250 0.00 3.52 -3.52 FAIL 350.00 350.00 350.00 350.00 0.64 0.64 0.00 0.00 12.250 0.00 3.73 -3.73 FAIL 375.00 375.00 375.00 375.00 0.66 0.66 115.00 0.00 12.250 0.00 3.80 -3.80 FAIL 400.00 400.00 400.00 400.00 0.67 0.67 115.00 0.00 12.250 0.00 3.86 -3.86 FAIL 425.00 424.99 425.00 424.99 0.66 0.66 115.00 0.00 12.250 0.00 3.82 -3.82 FAIL 450.00 449.98 450.00 449.98 0.65 0.65 115.00 0.00 12.250 0.00 3.78 -3.78 FAIL 475.00 474.96 475.00 474.96 0.64 0.64 115.00 0.00 12.250 0.00 3.74 -3.74 FAIL 500.00 499.93 500.00 499.93 0.63 0.63 115.00 0.00 12.250 0.00 3.70 -3.70 FAIL 525.00 524.89 525.00 524.89 0.64 0.64 115.00 0.00 12.250 0.00 3.73 -3.73 FAIL 550.00 549.81 550.00 549.84 0.65 0.65 295.00 180.00 12.250 0.44 3.77 -3.33 FAIL 575.00 574.77 575.00 574.77 0.66 0.66 115.00 0.00 12.250 0.00 3.80 -3.80 FAIL 600.00 599.68 600.00 599.68 0.67 0.67 115.00 0.00 12.250 0.00 3.83 -3.83 FAIL 625.00 624.58 625.00 624.58 0.70 0.70 115.00 0.00 12.250 0.00 3.93 -3.93 FAIL 650.00 649.45 650.00 649.45 0.73 0.73 115.00 0.00 12.250 0.00 4.03 -4.03 FAIL 675.00 674.30 675.00 674.30 0.77 0.77 115.00 0.00 12.250 0.00 4.13 -4.13 FAIL 700.00 699.13 700.00 699.13 0.80 0.80 115.00 0.00 12.250 0.00 4.22 -4.22 FAIL 725.00 723.93 725.00 723.93 0.84 0.84 115.00 0.00 12.250 0.00 4.36 -4.36 FAIL 750.00 748.70 750.00 748.70 0.89 0.89 115.00 0.00 12.250 0.00 4.50 -4.50 FAIL )GRAI1 +~nocoPhillips Alaska, In~ CPAI Plan Report Company: ConocoPhillips Alaska Inc. Date: 9/5/2007 Ti me: 17:10:06 Pager 1 Field: Colville River Unit Co-ordinate(NE) Reference: Well: Plan: GD4-301, True North. Site: Nanuq CD4 Verti+eal(TVD) References Plan: CD4-30t (36.3+19) 55.3 Well: . .Plan: CD4-301 Section (VS) Reference: Well (O.OON,O.OOE,66.OOAzi) Wellpath: Plan: CD4-301ST1 Survey Calculation Method: Minimum Curvature Db: Oracle Plan: CD4-301ST1wp01 Date Composed: 9/5/2007 Version: 5 Principal: Yes Tied-to: From Well Ref. Point Field: Colville River Unit North Slope Alaska United States Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: Nanuq CD4 Site Position: Northing: 5957526.10 ft Latitude: 70 17 32.966 N From: Map Easting: 378174.70 ft ~` Longitude: 150 59 10.763 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: -0.93 deg Well: Plan: CD4-301 Slot Name: Well Position: +N/-S 0.02 ft Northing: 5957526.12 ft Latitude: 70 17 32.966 N +E/-W 0.03 ft Easting : 378174.73 ft Longitude: 150 59 10.762 W Position Uncertainty: 0.00 ft Wellpath: Plan: CD4-301 ST1 Drilled From: Well Ref. Point Tie-on Depth: 36.30 ft Current Datum: Plan: CD4-301 (36.3+19) Height 55.30 ft Above System Datum: Mean Sea Level Magnetic Data: 12/1/2004 Declination: 23.78 deg Field Strength: 57492 nT Mag Dip Angle: 80.60 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.30 0.00 0.00 66.00 Survey Program for Definitive Wellpath Date: 9/5/2007 Validated: No Version: 1 Actual From To Survey Toolcode Tool Name ft ft Plan Section Information MD Intl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg- deg ft ft ft deg/t00ft deg/100ft deg/100ft deg i 36.30 0.00 0.00 - 36.30 0.00 0.00 0.00 0.00 0.00 0.00 _ 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 0.00 850.00 10.00 115.00 847.47 -18.39 39.44 2.00 2.00 0.00 115.00 2769.12 67.49 107.98 2282.62 -394.64 1126.70 3.00 3.00 -0.37 -7.69 12356.17 67.49 107.98 5952.69 -3128.48 9550.97 0.00 0.00 0.00 0.00 15624.67 90.22 351.52 6915.30 -1340.54 11408.44 3.50 0.70 -3.56 -100.57 CD4-301ST1wp01 T1 South 21615.13 90.22 351.52 6892.30 4584.42 10525.24 0.00 0.00 0.00 0.00 CD4-301ST1wp01 T1 North ORIGINAL WELL DETAILS Name +N/-S +E/-W Northing Easting Latitude Longitude Slot Plan: CD4-301 0.02 0.03 5957526.12 378174.73 70°1T32.966N 150°59'10.762W N/A WELLPATH DETAILS Plan: CD4-301ST1 Rig: Doyon 19 Ref. Datum: Plan: CD4-301 (36.3+19) 55.30ft V.Section Origin Origin Starting Angle +N/-S +E/-W From TVD 66.00° 0.00 0.00 36.30 ~«.... T M Azimuths to True North Magnetic North: 23.78° Magnetic Field Strength: 57492nT Dip Angle: 80.60° Date: 12/1/2004 Model: bggm2007 SURVEY PROGRAM Depth Fm Depth To Survey/Plan Tool 36.30 1000.00 Planned: CD4-301ST1wp01 VS CB-GYRO-SS 1000.00 21615.13 Planned: CD4-301ST1wp01 VS MWD+IFR-AK-CAZ-SC 0 _ CD4-301ST1w Ol _ _ 0 o° 0 o° Plan: CD4-301 (Plan: C <~° _o _ 0 5000 10000 15000 West(-)/East(+) [SOOOfUin] a a H PLAN DETAILS CD4-301ST1wp01 Version 5 9/5/2007 Start Point MD Inc Azi TVD +N/-S +E/-W 36.30 0.00 0.00 36.30 0.00 0.00 H~-~~~~su~r-ronr Sperry Drilling Sentices Corot Phillips Alaska REFERENCE INFORMATION Co-ordinate (N/E) Reference: Well Centre: Plan: CD4-301, True North Verkical (TVD) Reference: Plan: CD4-301 (36.3+19) 55.30 Section (VS) Reference: Slot - (O.OON,O.OOE) Measured Depth Reference: Plan: CD4-301 (36.3+19) 55.30 Calculation Method: Minimum Curvature 7000 8000 9000 10000 11000 12000 Vertical Section at 66 00° [1000fUin] lion Method:MD Interval: 100.00 nee From: 36.30 To: 14855.58 50 100 z 100 50 300 2 n Travelling Cylinder Azimuth (TFO+AZI) ~deg~ vs Centre to Centre Separation ~100ft/ink D~pth Fm Depth To Survey/Plan Tool 1 200.00 14855.55 Planned: CD4-301wp02 V6 MWD+IFR-AK-CAZ~ From Colour To M 0 250 250 500 500 750 750 1000 1000 1250 1250 1500 1500 1750 1750 ~~ ---° 2000 2000 2500 2500 3000 3000 3500 4000 4500 4500 5000 5000 6000 6000 7000 7000 8000 8000 9000 9000 1000a 10000 1200a 12000 14000 14000 1600a 16000 1800a 18000 2000a 20000 • --~ 2500a ~nocoPhillips Alaska, I~ CPAI Plan Report Campang: ConocoPhillipsAlaska Inc. Date: 9/5/2007 Time: 17:10:06 Page: 2 Field: Colville River Un it Go-ordinate(NF.) Reference: . We EI: Plan: CD4-301, True North. Site: Nanuq CD4 Vertical ('TE'D) Reference: Pla n: C D4-301 (36.3+19) 55.3 WeB: Plan; CD4-301 Section (VS) Reference: We A (O, OON,O.OOE,66.OOAzi) R'ellpath: Plan: CD4-301ST1 Survey Galculatiou Method: Min imu m Curvatu re Dbc Oracle Survey MD . Incl Azlm TVD Sys TVD N/5 EIEV D4apv MapE DLS TFO Comme t ft' deg. ` deg ft ft ft ft ft ft deg/100ft deg 36. 30 0.00 0 .00 36 .30 -19.00 0.00 0.00 5957526.12 • 378174. 73 - 0.00 0.00 100. 00 0.00 0 .00 100. 00 44.70 0.00 0.00 5957526.12 378174. 73 0.00 0.00 200. 00 0.00 0 .00 200 .00 144.70 0.00 0.00 5957526.12 378174. 73 0.00 0.00 300. 00 0.00 0 .00 300. 00 244.70 0.00 0.00 5957526.12 378174. 73 0.00 0.00 350. 00 0.00 0 .00 350. 00 294.70 0.00 0.00 5957526.12 378174. 73 0.00 0.00 400. 00 1.00 115 .00 400 .00 344.70 -0.18 0.40 5957525.93 378175. 12 2.00 0.00 500. 00 3.00 115 .00 499 .93 444.63 -1.66 3.56 5957524.40 378178. 26 2.00 0.00 600. 00 5.00 115 .00 599 .68 544.38 -4.61 9.88 5957521.35 378184. 53 2.00 0.00 700. 00 7.00 115 .00 699 .13 643.83 -9.02 19.35 5957516.78 378193. 93 2.00 0.00 800. 00 9.00 115 .00 798 .15 742.85 -14.91 31.97 5957510.70 378206. 45 2.00 0.00 850. 00 10.00 115 .00 847 .47 792.17 -18.39 39.44 5957507.09 378213. 87 2.00 0.00 900. 00 11.49 113 .99 896 .59 841.29 -22.25 47.93 5957503.10 378222. 29 3.00 352.31 1000. 00 14.47 112 .59 994 .02 938.72 -31.10 68.57 5957493.91 378242. 78 3.00 353.30 1100. 00 17.46 111 .66 1090 .15 1034.85 -41.45 94.05 5957483.16 378268. 09 3.00 354.67 1200. 00 20.45 111 .00 1184. 72 1129.42 -53.25 124.32 5957470.87 378298. 16 3.00 355.56 1300. 00 23.45 110 .50 1277. 46 1222.16 -66.48 159.27 5957457.07 378332. 89 3.00 356.19 1400. 00 26.44 110 .11 1368 .12 1312.82 -81.10 198.82 5957441.81 378372. 20 3.00 356.65 1500. 00 29.44 109 .79 1456 .45 1401.15 -97.08 242.87 5957425.12 378415. 97 3.00 357.01 1600. 00 32.44 109 .52 1542 .22 1486.92 -114.37 291.28 5957407.06 378464. 09 3.00 357.29 1700. 00 35.43 109 .30 1625 .17 1569.87 -132.91 343.93 5957387.66 378516. 43 3.00 357.52 1800. 00 38.43 109 .11 1705 .10 1649.80 -152.67 400.66 5957366.99 378572. 83 3.00 357.70 1900. 00 41.43 108 .94 1781 .77 1726.47 -173.58 461.34 5957345.10 378633. 16 3.00 357.86 2000. 00 44.43 108 .79 1854 .98 1799.68 -195.60 525.78 5957322.04 378697. 23 3.00 357.99 2100. 00 47.43 108 .65 1924 .53 1869.23 -218.65 593.82 5957297.90 378764. 88 3.00 358.10 2200. 00 50.42 108 .53 1990 .23 1934.93 -242.68 665.27 5957272.72 378835. 92 3.00 358.19 2300. 00 53.42 108 .42 2051 .89 1996.59 -267.61 739.92 5957246.57 378910. 16 3.00 358.27 2400. 00 56.42 108 .31 2109 .36 2054.06 -293.39 817.59 5957219.54 378987. 39 3.00 358.34 2500. 00 59.42 108 .21 2162. 46 2107.16 -319.94 898.04 5957191.70 379067. 39 3.00 358.40 2600. 00 62.42 108 .12 2211. 05 2155.75 -347.19 981.07 5957163.11 379149. 96 3.00 358.45 2700. 00 65.42 108 .04 2255. 01 2199.71 -375.06 1066.44 5957133.86 379234. 87 3.00 358.50 2769. 12 67.49 107 .98 2282. 62 2227.32 -394.64 1126.70 5957113.30 379294. 79 3.00 358.54 2800. 00 67.49 107 .98 2294. 44 2239.14 -403.45 1153.84 5957104.06 379321. 78 0.00 0.00 2900. 00 67.49 107 .98 2332. 72 2277.42 -431.97 1241.71 5957074.12 379409. 17 0.00 0.00 3000. 00 67.49 107 .98 2371. 01 2315.71 -460.48 1329.58 5957044.19 379496. 56 0.00 0.00 3075. 74 67.49 107 .98 2400. 00 2344.70 -482.08 1396.13 5957021.52 379562. 75 0.00 0.00 9 5/8"x121/4" 3100. 00 67.49 107 .98 2409. 29 2353.99 -489.00 1417.45 5957014.26 379583. 95 0.00 0.00 3200. 00 67.49 107 .98 2447 .57 2392.27 -517.51 1505.32 5956984.32 379671. 34 0.00 0.00 3300. 00 67.49 107 .98 2485 .85 2430.55 -546.03 1593.19 5956954.39 379758. 73 0.00 0.00 3400. 00 67.49 107 .98 2524 .13 2468.83 -574.55 1681.06 5956924.46 379846. 12 0.00 0.00 3500. 00 67.49 107 .98 2562 .41 2507.11 -603.06 1768.93 5956894.52 379933. 51 0.00 0.00 3600. 00 67.49 107 .98 2600. 70 2545.40 -631.58 1856.81 5956864.59 380020. 90 0.00 0.00 3700. 00 67.49 107 .98 2638. 98 2583.68 -660.09 1944.68 5956834.65 380108. 29 0.00 0.00 3800. 00 67.49 107 .98 2677. 26 2621.96 -688.61 2032.55 5956804.72 380195. 68 0.00 0.00 3900. 00 67.49 107 .98 2715. 54 2660.24 -717.13 2120.42 5956774.79 380283. 07 0.00 0.00 4000. 00 67.49 107 .98 2753. 82 2698.52 -745.64 2208.29 5956744.85 380370. 46 0.00 0.00 4100. 00 67.49 107 .98 2792. 10 2736.80 -774.16 2296.16 5956714.92 380457. 85 0.00 0.00 4200. 00 67.49 107 .98 2830. 38 2775.08 -802.67 2384.03 5956684.99 380545. 25 0.00 0.00 4300. 00 67.49 107 .98 2868 .67 2813.37 -831.19 2471.91 5956655.05 380632. 64 0.00 0.00 4400. 00 67.49 107 .98 2906 .95 2851.65 -859.71 2559.78 5956625.12 380720. 03 0.00 0.00 4500. 00 67.49 107 .98 2945 .23 2889.93 -888.22 2647.65 5956595.18 380807. 42 0.00 0.00 4600. 00 67.49 107 .98 2983 .51 2928.21 -916.74 2735.52 5956565.25 380894. 81 0.00 0.00 4700. 00 67.49 107 .98 3021 .79 2966.49 -945.25 2823.39 5956535.32 380982. 20 0.00 0.00 4800. 00 67.49 107 .98 3060 .07 3004.77 -973.77 2911.26 5956505.38 381069. 59 0.00 0.00 02:GINAL ~nocoPhillips Alaska, In~ CPAI Plan Report Company: GonocoPhillipsAlaska Inc. Dater 9/5/2007 Time: 17x0:06 Page: 3 Field: Colville River Un it Co-ordinate(NE) Reference: We ll: P lan: CD4-301, True North Site: Nanuq CD4 Vertical (TVD) Reference: Pla n: CD4-301 (36. 3+19) 55.3 Well• Plan: CD4-301 Section (VS) Keference: We ll (O .OON,O.OOE, 66.OOAzi) Wellpath: Plan: CD4-301ST1 Survey Calculation Mcthod: Minimu m Curvature Db: Oracle Survey MD IncT Azim 'TVD Sys TVD N/S EIW MapN MapE DLS TFO Comme 't ft deg deg ft ft ft ft ft ft deg/1OOft deg 4900.00 67.49 107 .98 3098 .35 3043.05 -1002.29 2999.13 5956475.45 381156 .98 0.00 0.00 5000.00 67.49 107 .98 3136 .64 3081.34 -1030.80 3087.00 5956445.52 381244 .37 0.00 0.00 5100.00 67.49 107 .98 3174 .92 3119.62 -1059.32 3174.88 5956415.58 381331 .76 0.00 0.00 5200.00 67.49 107 .98 3213 .20 3157.90 -1087.83 3262.75 5956385.65 381419 .15 0.00 0.00 5300.00 67.49 107 .98 3251 .48 3196.18 -1116.35 3350.62 5956355.71 381506 .54 0.00 0.00 5400.00 67.49 107 .98 3289 .76 3234.46 -1144.87 3438.49 5956325.78 381593 .93 0.00 0.00 5500.00 67.49 107 .98 3328 .04 3272.74 -1173.38 3526.36 5956295.85 381681 .32 0.00 0.00 5600.00 67.49 107 .98 3366 .33 3311.03 -1201.90 3614.23 5956265.91 381768 .71 0.00 0.00 5700.00 67.49 107 .98 3404 .61 3349.31 -1230.41 3702.10 5956235.98 381856 .10 0.00 0.00 5800.00 67.49 107 .98 3442 .89 3387.59 -1258.93 3789.97 5956206.05 381943 .49 0.00 0.00 5900.00 67.49 107 .98 3481 .17 3425.87 -1287.44 3877.85 5956176.11 382030. 88 0.00 0.00 6000.00 67.49 107 .98 3519 .45 3464.15 -1315.96 3965.72 5956146.18 382118. 27 0.00 0.00 6100.00 67.49 107 .98 3557 .73 3502.43 -1344.48 4053.59 5956116.24 382205. 66 0.00 0.00 6200.00 67.49 107 .98 3596 .01 3540.71 -1372.99 4141.46 5956086.31 382293. 05 0.00 0.00 6300.00 67.49 107 .98 3634 .30 3579.00 -1401.51 4229.33 5956056.38 382380. 44 0.00 0.00 6400.00 67.49 107 .98 3672 .58 3617.28 -1430.02 4317.20 5956026.44 382467. 83 0.00 0.00 6500.00 67.49 107 .98 3710 .86 3655.56 -1458.54 4405.07 5955996.51 382555. 22 0.00 0.00 6600.00 67.49 107 .98 3749 .14 3693.84 -1487.06 4492.95 5955966.58 382642. 61 0.00 0.00 6700.00 67.49 107 .98 3787 .42 3732.12 -1515.57 4580.82 5955936.64 382730. 00 0.00 0.00 6800.00 67.49 107 .98 3825 .70 3770.40 -1544.09 4668.69 5955906.71 382817. 40 0.00 0.00 6900.00 67.49 107 .98 3863 .98 3808.68 -1572.60 4756.56 5955876.77 382904. 79 0.00 0.00 7000.00 67.49 107 .98 3902 .27 3846.97 -1601.12 4844.43 5955846.84 382992. 18 0.00 0.00 7100.00 67.49 107 .98 3940 .55 3885.25 -1629.64 4932.30 5955816.91 383079. 57 0.00 0.00 7200.00 67.49 107 .98 3978 .83 3923.53 -1658.15 5020.17 5955786.97 383166. 96 0.00 0.00 7300.00 67.49 107 .98 4017 .11 3961.81 -1686.67 5108.04 5955757.04 383254. 35 0.00 0.00 7400.00 67.49 107 .98 4055 .39 4000.09 -1715.18 5195.92 5955727.11 383341. 74 0.00 0.00 7500.00 67.49 107 .98 4093 .67 4038.37 -1743.70 5283.79 5955697.17 383429. 13 0.00 0.00 7600.00 67.49 107 .98 4131 .96 4076.66 -1772.22 5371.66 5955667.24 383516. 52 0.00 0.00 7700.00 67.49 107 .98 4170 .24 4114.94 -1800.73 5459.53 5955637.30 383603. 91 0.00 0.00 7800.00 67.49 107 .98 4208 .52 4153.22 -1829.25 5547.40 5955607.37 383691. 30 0.00 0.00 7900.00 67.49 107 .98 4246 .80 4191.50 -1857.76 5635.27 5955577.44 383778. 69 0.00 0.00 8000.00 67.49 107 .98 4285 .08 4229.78 -1886.28 5723.14 5955547.50 383866. 08 0.00 0.00 8100.00 67.49 107 .98 4323 .36 4268.06 -1914.80 5811.01 5955517.57 383953. 47 0.00 0.00 8200.00 67.49 107 .98 4361. 64 4306.34 -1943.31 5898.89 5955487.64 384040. 86 0.00 0.00 8300.00 67.49 107 .98 4399. 93 4344.63 -1971.83 5986.76 5955457.70 384128. 25 0.00 0.00 8400.00 67.49 107 .98 4438. 21 4382.91 -2000.34 6074.63 5955427.77 384215. 64 0.00 0.00 8500.00 67.49 107 .98 4476. 49 4421.19 -2028.86 6162.50 5955397.83 384303. 03 0.00 0.00 8600.00 67.49 107 .98 4514. 77 4459.47 -2057.37 6250.37 5955367.90 384390. 42 0.00 0.00 8700.00 67.49 107 .98 4553. 05 4497.75 -2085.89 6338.24 5955337.97 384477. 81 0.00 0.00 8800.00 67.49 107 .98 4591. 33 4536.03 -2114.41 6426.11 5955308.03 384565. 20 0.00 0.00 8900.00 67.49 107 .98 4629. 62 4574.32 -2142.92 6513.99 .5955278.10 384652. 59 0.00 0.00 9000.00 67.49 107 .98 4667. 90 4612.60 -2171.44 6601.86 5955248.17 384739. 98 0.00 0.00 9100.00 67.49 107 .98 4706. 18 4650.88 -2199.95 6689.73 5955218.23 384827. 37 0.00 0.00 9200.00 67.49 107 .98 4744. 46 4689.16 -2228.47 6777.60 5955188.30 384914. 76 0.00 0.00 9300.00 67.49 107 .98 4782 .74 4727.44 -2256.99 6865.47 5955158.36 385002. 15 0.00 0.00 9400.00 67.49 107 .98 4821. 02 4765.72 -2285.50 6953.34 5955128.43 385089. 54 0.00 0.00 9500.00 67.49 107 .98 4859. 30 4804.00 -2314.02 7041.21 5955098.50 385176. 94 0.00 0.00 9600.00 67.49 107 .98 4897. 59 4842.29 -2342.53 7129.08 5955068.56 385264. 33 0.00 0.00 9700.00 67.49 107 .98 4935. 87 4880.57 -2371.05 7216.96 5955038.63 385351. 72 0.00 0.00 9800.00 67.49 107 .98 4974. 15 4918.85 -2399.57 7304.83 5955008.70 385439. 11 0.00 0.00 9900.00 67.49 107 .98 5012. 43 4957.13 -2428.08 7392.70 5954978.76 385526. 50 0.00 0.00 10000.00 67.49 107 .98 5050. 71 4995.41 -2456.60 7480.57 5954948.83 385613. 89 0.00 0.00 '~GINl1L ~nocoPhillips Alaska, In~ CPAI Plan Report Company: GonocoPhillipsAlaska lnc. Date: 9/512007 Time: 1:7:10:06 Page: 4 Field: Colville River Unit Co-ordinate(tiE) Reference: WeIL Plan: CD4-301, True North Site: Nanuq CD4 Vertical (TVD) Reference: Plan: CD4-301 (36.3+19) 55.3 Well: Plan: CD4-301 Seetion (VS) Keference: Well (O.OON,O.OOE,66.OOAzi) Wellpath: Plan: CD4-301ST1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl ' Azim TVD Sys TVD N/S E/W MxpN MapE DLS TFO Comme t ft deg deg ft ft ft' ft ft ft degl100ft deg 10100.00 67.49 107.98 5088.99 5033.69 -2485.11 7568.44 5954918.90 385701.28 0.00 0.00 10200.00 67.49 107.98 5127.27 5071.97 -2513.63 7656.31 5954888.96 385788.67 0.00 0.00 10300.00 67.49 107.98 5165.56 5110.26 -2542.15 7744.18 5954859.03 385876.06 0.00 0.00 10400.00 67.49 107.98 5203.84 5148.54 -2570.66 7832.06 5954829.09 385963.45 0.00 0.00 10500.00 67.49 107.98 5242.12 5186.82 -2599.18 7919.93 5954799.16 386050.84 0.00 0.00 10600.00 67.49 107.98 5280.40 5225.10 -2627.69 8007.80 5954769.23 386138.23 0.00 0.00 10700.00 67.49 107.98 5318.68 5263.38 -2656.21 8095.67 5954739.29 386225.62 0.00 0.00 10800.00 67.49 107.98 5356.96 5301.66 -2684.73 8183.54 5954709.36 386313.01 0.00 0.00 10900.00 67.49 107.98 5395.25 5339.95 -2713.24 8271.41 5954679.43 386400.40 0.00 0.00 11000.00 67.49 107.98 5433.53 5378.23 -2741.76 8359.28 5954649.49 386487.79 0.00 0.00 11100.00 67.49 107.98 5471.81 5416.51 -2770.27 8447.15 5954619.56 386575.18 0.00 0.00 11200.00 67.49 107.98 5510.09 5454.79 -2798.79 8535.03 5954589.62 386662.57 0.00 0.00 KOP 11300.00 67.49 107.98 5548.37 5493.07 -2827.30 8622.90 5954559.69 386749.96 0.00 0.00 11400.00 67.49 107.98 5586.65 5531.35 -2855.82 8710.77 5954529.76 386837.35 0.00 0.00 11500.00 67.49 107.98 5624.93 5569.63 -2884.34 8798.64 5954499.82 386924.74 0.00 0.00 11600.00 67.49 107.98 5663.22 5607.92 -2912.85 8886.51 5954469.89 387012.13 0.00 0.00 11700.00 67.49 107.98 5701.50 5646.20 -2941.37 8974.38 5954439.96 387099.52 0.00 0.00 11800.00 67.49 107.98 5739.78 5684.48 -2969.88 9062.25 5954410.02 387186.91 0.00 0.00 11900.00 67.49 107.98 5778.06 5722.76 -2998.40 9150.12 5954380.09 387274.30 0.00 0.00 12000.00 67.49 107.98 5816.34 5761.04 -3026.92 9238.00 5954350.15 387361.69 0.00 0.00 12100.00 67.49 107.98 5854.62 5799.32 -3055.43 9325.87 5954320.22 387449.09 0.00 0.00 12200.00 67.49 107.98 5892.90 5837.60 -3083.95 9413.74 5954290.29 387536.48 0.00 0.00 12300.00 67.49 107.98 5931.19 5875.89 -3112.46 9501.61 5954260.35 387623.87 0.00 0.00 12356.17 67.49 107.98 5952.69 5897.39 -3128.48 9550.97 5954243.54 387672.95 0.00 0.00 12400.00 67.22 106.34 5969.57 5914.27 -3140.42 9589.62 5954230.98 387711.40 3.50 259.43 12500.00 66.66 102.59 6008.75 5953.45 -3163.40 9678.68 5954206.56 387800.08 3.50 260.06 12600.00 66.19 98.80 6048.76 5993.46 -3180.41 9768.72 5954188.09 387889.82 3.50 261.53 12700.00 65.81 94.99 6089.44 6034.14 -3191.39 9859.39 5954175.65 387980.29 3.50 263.05 12800.00 65.53 91.17 6130.65 6075.35 -3196.29 9950.36 5954169.27 388071.16 3.50 264.60 12900.00 65.35 87.32 6172.23 6116.93 -3195.09 10041.28 5954169.00 388162.08 3.50 266.18 13000.00 65.26 83.47 6214.03 6158.73 -3187.81 10131.82 5954174.81 388252.72 3.50 267.77 13100.00 65.27 79.62 6255.88 6200.58 -3174.46 10221.63 5954186.71 388342.73 3.50 269.38 13200.00 65.38 75.77 6297.64 6242.34 -3155.09 10310.39 5954204.63 388431.78 3.50 271.00 13300.00 65.59 71.93 6339.15 6283.85 -3129.78 10397.76 5954228.51 388519.54 3.50 272.60 13400.00 65.89 68.10 6380.25 6324.95 -3098.63 10483.42 5954258.27 388605.69 3.50 274.20 13500.00 66.29 64.30 6420.79 6365.49 -3061.75 10567.04 5954293.80 388689.89 3.50 275.77 13600.00 66.78 60.52 6460.61 6405.31 -3019.27 10648.32 5954334.95 388771.84 3.50 277.31 13700.00 67.36 56.77 6499.58 6444.28 -2971.35 10726.95 5954381.58 388851.23 3.50 278.82 13800.00 68.03 53.06 6537.54 6482.24 -2918.19 10802.64 5954433.51 388927.77 3.50 280.28 13900.00 68.78 49.38 6574.36 6519.06 -2859.96 10875.11 5954490.55 389001.16 3.50 281.69 14000.00 69.61 45.75 6609.89 6554.59 -2796.89 10944.08 5954552.48 389071.14 3.50 283.04 14100.00 70.51 42.15 6644.00 6588.70 -2729.22 11009.30 5954619.09 389137.44 3.50 284.33 14200.00 71.48 38.59 6676.57 6621.27 -2657.19 11070.52 5954690.10 389199.82 3.50 285.56 14300.00 72.52 35.08 6707.47 6652.17 -2581.08 11127.52 5954765.27 389258.04 3.50 286.72 14400.00 73.62 31.61 6736.59 6681.29 -2501.17 11180.09 5954844.32 389311.89 3.50 287.80 14500.00 74.78 28.17 6763.83 6708.53 -2417.76 11228.02 5954926.94 389361.16 3.50 288.82 14600.00 75.99 24.78 6789.07 6733.77 -2331.15 11271.14 5955012.82 389405.68 3.50 289.75 14700.00 77.24 21.42 6812.22 6756.92 -2241.68 11309.29 5955101.66 389445.27 3.50 290.61 14800.00 78.54 18.09 6833.21 6777.91 -2149.67 11342.33 5955193.11 389479.79 3.50 291.39 14900.00 79.87 14.80 6851.94 6796.64 -2055.48 11370.13 5955286.83 389509.11 3.50 292.08 15000.00 81.24 11.53 6868.35 6813.05 -1959.44 11392.58 5955382.49 389533.12 3.50 292.70 15100.00 82.63 8.29 6882.38 6827.08 -1861.92 11409.62 5955479.71 389551.73 3.50 293.24 15200.00 84.05 5.07 6893.98 6838.68 -1763.29 11421.16 5955578.14 389564.87 3.50 293.69 ORIGINAL ~nocoPhillips Alaska, In~ CPAI Plan Report Company: ConocoPhillips Alaska Inc. Date: 9!5/2007 Time: 17:10:06 Page: 5 Field: Colville River Unit Co-ordinate(NE) Reference: Well: Plan: CD4-30.1, True North Site: Nanuq CD4 Vertical (TVI)) Reference: Plan: CD4-301 (36.3+19) 55.3 Weih Plan: CD4-301 Section (VS) Referenee: Well (O.OON,O.OOE,66.OOAzi) Wellpath: Plan'. CD4-301ST1 Survey Calculation Method: Minimum Curvature Db: OraGe Survey NID Incl Azim TVD Sys TVD N/S EJW MapN MapF. DLS TFO Comme t ft deg deg ft ft ft ft ft ft degl100ft deg 15300.00 85.49 1.86 6903.11 6847.81 -1663.90 11427.18 5955677.40 389572.49 3.50 294.07 15400.00 86.94 358.67 6909.72 6854.42 -1564.13 11427.64 5955777.14 389574.57 3.50 294.36 15455.69 87.75 356.90 6912.30 6857.00 -1508.55 11425.48 5955832.74 389573.32 3.50 294.57 Kuparuk C 15500.00 88.39 355.49 6913.79 6858.49 -1464.36 11422.54 5955876.97 389571.09 3.50 294.65 15600.00 89.86 352.31 6915.32 6860.02 -1364.96 11411.91 5955976.53 389562.07 3.50 294.70 15624.67 90.22 351.52 6915.30 6860.00 -1340.54 11408.44 5956001.00 389559.00 3.50 294.75 CD4-301ST1wp 1 T 15700.00 90.22 351.52 6915.01 6859.71 -1266.03 11397.33 5956075.67 389549.10 0.00 180.00 15800.00 90.22 351.52 6914.63 6859.33 -1167.12 11382.59 5956174.80 389535.97 0.00 180.00 15900.00 90.22 351.52 6914.24 6858.94 -1068.21 11367.85 5956273.92 389522.83 0.00 180.00 16000.00 90.22 351.52 6913.86 6858.56 -969.31 11353.10 5956373.05 389509.69 0.00 180.00 16100.00 90.22 351.52 6913.47 6858.17 -870.40 11338.36 5956472.17 389496.55 0.00 180.00 16200.00 90.22 351.52 6913.09 6857.79 -771.49 11323.62 5956571.30 389483.42 0.00 180.00 16300.00 90.22 351.52 6912.71 6857.41 -672.59 11308.87 5956670.42 389470.28 0.00 180.00 16400.00 90.22 351.52 6912.32 6857.02 -573.68 11294.13 5956769.54 389457.14 0.00 180.00 16500.00 90.22 351.52 6911.94 6856.64 -474.78 11279.39 5956868.67 389444.00 0.00 180.00 16600.00 90.22 351.52 6911.56 6856.26 -375.87 11264.64 5956967.79 389430.87 0.00 180.00 16700.00 90.22 351.52 6911.17 6855.87 -276.96 11249.90 5957066.92 389417.73 0.00 180.00 16800.00 90.22 351.52 6910.79 6855.49 -178.06 11235.15 5957166.04 389404.59 0.00 180.00 16900.00 90.22 351.52 6910.40 6855.10 -79.15 11220.41 5957265.16 389391.45 0.00. 180.00 17000.00 90.22 351.52 6910.02 6854.72 19.76 11205.67 5957364.29 389378.31 0.00 180.00 17100.00 90.22 351.52 6909.64 6854.34 118.66 11190.92 5957463.41 389365.18 0.00 180.00 17200.00 90.22 351.52 6909.25 6853.95 217.57 11176.18 5957562.54 389352.04 0.00 180.00 17300.00 90.22 351.52 6908.87 6853.57 316.48 11161.44 5957661.66 389338.90 0.00 180.00 17400.00 90.22 351.52 6908.48 6853.18 415.38 11146.69 5957760.78 389325.76 0.00 180.00 17500.00 90.22 351.52 6908.10 6852.80 514.29 11131.95 5957859.91 389312.63 0.00 180.00 17600.00 90.22 351.52 6907.72 6852.42 613.20 11117.21 5957959.03 389299.49 0.00 180.00 17700.00 90.22 351.52 6907.33 6852.03 712.10 11102.46 5958058.16 389286.35 0.00 180.00 17800.00 90.22 351.52 6906.95 6851.65 811.01 11087.72 5958157.28 389273.21 0.00 180.00 17900.00 90.22 351.52 6906.56 6851.26 909.91 11072.98 5958256.41 389260.08 0.00 180.00 18000.00 90.22 351.52 6906.18 6850.88 1008.82 11058.23 5958355.53 389246.94 0.00 180.00 18100.00 90.22 351.52 6905.80 6850.50 1107.73 11043.49 5958454.65 389233.80 0.00 180.00 18200.00 90.22 351.52 6905.41 6850.11 1206.63 11028.75 5958553.78 389220.66 0.00 180.00 18300.00 90.22 351.52 6905.03 6849.73 1305.54 11014.00 5958652.90 389207.53 0.00 180.00 18400.00 90.22 351.52 6904.64 6849.34 1404.45 10999.26 5958752.03 389194.39 0.00 180.00 18500.00 90.22 351.52 6904.26 6848.96 1503.35 10984.52 5958851.15 389181.25 0.00 180.00 18600.00 90.22 351.52 6903.88 6848.58 1602.26 10969.77 5958950.27 389168.11 0.00 180.00 18700.00 90.22 351.52 6903.49 6848.19 1701.17 10955.03 5959049.40 389154.98 0.00 180.00 18800.00 90.22 351.52 6903.11 6847.81 1800.07 10940.29 5959148.52 389141.84 0.00 180.00 18900.00 90.22 351.52 6902.72 6847.42 1898.98 10925.54 5959247.65 389128.70 0.00 180.00 19000.00 90.22 351.52 6902.34 6847.04 1997.89 10910.80 5959346.77 389115.56 0.00 180.00 19100.00 90.22 351.52 6901.96 6846.66 2096.79 10896.06 5959445.90 389102.43 0.00 180.00 19200.00 90.22 351.52 6901.57 6846.27 2195.70 10881.31 5959545.02 389089.29 0.00 180.00 19300.00 90.22 351.52 6901.19 6845.89 2294.60 10866.57 5959644.14 389076.15 0.00 180.00 19400.00 90.22 351.52 6900.80 6845.50 2393.51 10851.83 5959743.27 389063.01 0.00 180.00 19500.00 90.22 351.52 6900.42 6845.12 2492.42 10837.08 5959842.39 389049.88 0.00 180.00 19600.00 90.22 351.52 6900.04 6844.74 2591.32 10822.34 5959941.52 389036.74 0.00 180.00 19700.00 90.22 351.52 6899.65 6844.35 2690.23 10807.59 5960040.64 389023.60 0.00 180.00 19800.00 90.22 351.52 6899.27 6843.97 2789.14 10792.85 5960139.76 389010.46 0.00 180.00 19900.00 90.22 351.52 6898.89 6843.59 2888.04 10778.11 5960238.89 388997.33 0.00 180.00 20000.00 90.22 351.52 6898.50 6843.20 2986.95 10763.36 5960338.01 388984.19 0.00 180.00 20100.00 90.22 351.52 6898.12 6842.82 3085.86 10748.62 5960437.14 388971.05 0.00 180.00 20200.00 90.22 351.52 6897.73 6842.43 3184.76 10733.88 5960536.26 388957.91 0.00 180.00 1 So ORIGINAL ~nocoPhillips Alaska, I~ CPAI Plan Report Company:. ConocoPhillipsAlaska Ina Date: 9/5/2007 Time: 17:10:06 Pagec 6 Field: Colville River Unit Co-ordinate(NE) Reference: Well: P lan: CD4-301, True North Site: Nanuq CD4 Vertical. (TVD) Reference: Plan: CD4-301 (36.3+1 9) 55.3 We1L Plan: CD4-301 Section (VS) Reference: Well (O :OON,O.OOE,66.OOAzi) Wellpath: ° Plan: GD4-301ST1 Survey Calculation Method: Minimum Curvature Db: Oracle Survey ', MD Incl Azim TVD Sys TVD N/S E/W MapN MapE , DL5 TFO Comme t ft deg deg ft tt ff ft ft ft deg/100tt deg 20300.00 90.22 351.52 6897 .35 6842.05 3283.67 10719.13 5960635.38 388944.78 0.00 180. 00 20400.00 90.22 351.52 6896 .97 6841.67 3382.58 10704.39 5960734.51 388931.64 0.00 180. 00 20500.00 90.22 351.52 6896 .58 6841.28 3481.48 10689.65 5960833.63 388918.50 0.00 180. 00 20600.00 90.22 351.52 6896 .20 6840.90 3580.39 10674.90 5960932.76 388905.36 0.00 180. 00 20700.00 90.22 351.52 6895 .81 6840.51 3679.29 10660.16 5961031.88 388892.23 0.00 180. 00 20800.00 90.22 351.52 6895 .43 6840.13 3778.20 10645.42 5961131.01 388879.09 0.00 180. 00 20900.00 90.22 351.52 6895 .05 6839.75 3877.11 10630.67 5961230.13 388865.95 0.00 180. 00 21000.00 90.22 351.52 6894 .66 6839.36 3976.01 10615.93 5961329.25 388852.81 0.00 180. 00 21100.00 90.22 351.52 6894 .28 6838.98 4074.92 10601.19 5961428.38 388839.68 0.00 180. 00 21200.00 90.22 351.52 6893 .89 6838.59 4173.83 10586.44 5961527.50 388826.54 0.00 180. 00 21300.00 90.22 351.52 6893 .51 6838.21 4272.73 10571.70 5961626.63 388813.40 0.00 180. 00 21400.00 90.22 351.52 6893 .13 6837.83 4371.64 10556.96 5961725.75 388800.26 0.00 180. 00 21500.00 90.22 351.52 6892 .74 6837.44 4470.55 10542.21 5961824.87 388787.13 0.00 180. 00 21600.00 90.22 351.52 6892 .36 6837.06 4569.45 10527.47 5961924.00 388773.99 0.00 180. 00 21615.13 - 90.22 351.52 6892 .30 ~ 6837.00 4584.42 10525.24 5961939.00 388772.00 0.00 180. 00 CD4-301ST1wp 1 Targets - - Map Map c-_ .Latitude ---> <--- Longitude ---> Name Description TVD +N/-5 +E/-W Northing Easting Deg Min Sec Deg Min Sec .Dip. Dir. ft ft ft ft ft CD4-301ST1wp01 T1 North 6892.30 4584.42 10525.24 5961939.00 388772.00 70 18 17.981 N 150 54 3.845 W CD4-301wp01 T1 South Original 6912.30 -1340.54 11408.44 5956001.00 389559.00 70 17 19.697 N 150 53 38.353 W CD4-301ST1wp01 T1 South 6915.30 -1340.54 11408.44 5956001.00 389559.00 70 17 19.697 N 150 53 38.353 W Annotation MD TVll ft ft _ _ _ - 11200.00 5510.09 KOP _ - Casing Points MD TVD Dis>meter Hole Size Name ft ft in in 3075.74 2400.00 9.625 12.250 9 5/8" x 12 1 /4" - -- 15624.67 6915.30 7.000 8.750 7"x 8 3/4" 21615.13 6892.30 4.500 6.750 4 1 /2" x 6 3/4" Formations MD TVD Formations Lithology Dip Angle Dip Direcfion ft tt deg deg 15455.69 6912.30 Kuparuk C 0.00 0.00 0.00 LCU 0.00 0.00 T1 No '2!61NAL ~nocoPhillips Alaska, In~ Anticollision Report Company: ConocoPhillipsAlaska Inc. Date: Field: Colville River Unit 10/23/2007 Time: 15:50:47 Page: 1 Reference Site: Nanuq CD4 Co-ordinate(NE) Reference: Reference Well: Plan: CD4-301 Vertical (T\'D) Reference: Reference Wellpath: Plan: CD4-301ST1 GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 25.00 ft Depth Range: 36.30 to 21615.13 ft Maximum Radius: 2357.88 ft Casing Points 1VID TVD ft ft 3075.74 2400.00 15624.67 6915.30 21615.13 6892.30 Diameter Hole Size m in 9.625 12.250 7.000 8.750 4.500 6.750 9 5/8" x 12 1 /4" 7"x 8 3/4" 4 1/2" x 6 3/4" Plan: CD4-301ST1wp01 Date Composed: 9/5/2007 Version: 5 Principal: Yes Tied-to: From Well Ref. Point Summary <-------------------- Offset Wellpath ----- Site Well - - __ -----------> Wellpath Reference 1MD ft Offset lyiD ft Ctr-Ctr No-Go Distance Area ft ft Allowable Deviation ft arning - Nanuq CD4 CD4-208 - CD4-208 V7 374.21 _ _ 375.00 - 141.22 _ 6.94 134.27 Pass: Major Risk Nanuq CD4 CD4-208 CD4-208P61 V6 374.21 375.00 141.22 6.94 134.27 Pass: Major Risk Nanuq CD4 CD4-209 CD4-209 V4 348.87 350.00 163.97 6.93 157.04 Pass: Major Risk Nanuq CD4 CD4-210 CD4-210 V3 396.21 400.00 180.73 7.19 173.54 Pass: Major Risk Nanuq CD4 CD4-211 CD4-211 V2 443.56 450.00 201.68 8.30 193.39 Pass: Major Risk Nanuq CD4 CD4-213 CD4-213 V4 372.17 375.00 238.84 7.30 231.54 Pass: Major Risk Nanuq CD4 CD4-302 CD4-302 V3 523.28 525.00 17.65 9.09 8.57 Pass: Major Risk Nanuq CD4 CD4-306 CD4-306 V1 446.50 450.00 99.04 7.29 91.76 Pass: Major Risk Nanuq CD4 Nanuq 5 Nanuq 5 V1 446.91 450.00 215.85 7.16 208.69 Pass: Major Risk Nanuq CD4 Nanuq 5 Plan: CD4-212 VO Plan: 446.91 450.00 215.85 7.17 208.69 Pass: Major Risk Nanuq CD4 Plan: CD4-05 Plan: CD4-05 V3 Plan: 398.45 400.00 80.53 8.37 72.16 Pass: Major Risk Nanuq CD4 Plan: CD4-301 Plan: CD4-301 V4 Plan: 11225.00 11225.00 0.19 334.14 -333.95 FAIL: Major Risk Nanuq CD4 Plan: CD4-303 Plan: CD4-303 V3 Plan: 398.87 400.00 40.40 8.33 32.08 Pass: Major Risk Nanuq CD4 Plan: CD4-303 Plan: CD4-303ST1 V3 PI 398.87 400.00 40.40 8.33 32.08 Pass: Major Risk Nanuq CD4 Rig: CD4-304 Plan: CD4-304 V4 Plan: 398.71 400.00 60.36 8.32 52.03 Pass: Major Risk Nanuq CD4 Rig: CD4-304 Plan: CD4-304ST1 V6 PI 398.71 400.00 60.36 8.32 52.03 Pass: Major Risk Nanuq CD4 Rig: CD4-304 Rig: CD4-304 V10 324.58 325.00 62.23 6.47 55.77 Pass: Major Risk Nanuq CD4 TDed: CD4-07 Plan: CD4-07 VO Plan: 397.75 400.00 120.38 8.37 112.02 Pass: Major Risk Nanuq CD4 TDed: CD4-07 TDed: CD4-07 V14 349.25 350.00 121.65 6.54 115.11 Pass: Major Risk Site: Nanuq CD4 Well: CD4-208 Wellpath: CD4-208 V7 Rule Assigned: Major Risk Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable ' MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 36.30 36.30 36.15 36.15 0.00 0.00 255.41 255.41 9.625 140.43 0.91 139.52 Pass 50.15 50.15 50.00 50.00 0.02 0.02 255.42 255.42 9.625 140.44 1.13 139.31 Pass 75.15 75.15 75.00 75.00 0.04 0.04 255.45 255.45 9.625 140.47 1.53 138.94 Pass 100.15 100.15 100.00 100.00 0.07 0.09 255.50 255.50 9.625 140.52 1.97 138.54 Pass 125.15 125.15 125.00 125.00 0.13 0.14 255.55 255.55 9.625 140.56 2.51 138.05 Pass 150.15 150.15 150.00 150.00 0.19 0.20 255.62 255.62 9.625 140.60 3.04 137.56 Pass 175.15 175.15 175.00 175.00 0.24 0.25 255.68 255.68 9.625 140.64 3.57 137.06 Pass 200.15 200.15 200.00 200.00 0.30 0.30 255.77 255.77 9.625 140.68 4.11 136.57 Pass 225.15 225.15 225.00 225.00 0.36 0.36 255.86 255.86 9.625 140.74 4.64 136.10 Pass 250.14 250.14 250.00 249.99 0.41 0.41 255.98 255.98 9.625 140.81 5.18 135.64 Pass 275.14 275.14 275.00 274.99 0.47 0.43 256.10 256.10 9.625 140.90 5.62 135.27 Pass 300.14 300.14 300.00 299.99 0.53 0.43 256.21 256.21 9.625 140.97 6.02 134.95 Pass 325.14 325.14 325.00 324.99 0.58 0.43 256.29 256.29 9.625 141.03 6.41 134.62 Pass 350.13 350.13 350.00 349.99 0.64 0.43 256.35 256.35 9.625 141.09 6.80 134.28 Pass 374.21 374.21 375.00 374.99 0.66 0.37 256.42 141.42 9.625 141.22 6.94 134.27 Pass 398.27 398.27 400.00 399.99 0.67 0.32 256.52 141.52 9.625 141.52 7.09 134.44 Pass Reference: Error Model: Scan Method: Error Surface Name Well: Plan: CD4-301, True North Plan: CD4-301 (36.3+19) 55.3 Db: Oracle Plan: CD4-301 ST1 wp01 & NOT PLAN ISCWSA Ellipse Trav Cylinder North Ellipse + Casing PROG ~'~IGINAL Vertical (~VD) Reference Plan. CDa301 (36.3+19) 55.~ue ..w ~„ Section NS11 Reference: Slot- (0 OON O.OpE) Meawred Depifi Reference: Plan. CD4J01 (36.3+19) 55.30 Calculation Me~hotl. Minimum Curvature 4-306 From Colour To MD 36 250 250 500 5UU 750 750 1000 1000 1250 1250 1500 1500 1750 1750 ~ 2000 2000 - 2500 2500 3000 3000 3500 3500 4000 000 4500 4 0 5000 500 6000 6000 7000 000 8000 8 00 9000 90 0 10000 100 12000 12000 14000 pth Fm Depth To Survey/Plan Tool 3 .30 1000.00 Planned: CD4301ST1wp01 V6 CB-GYRO-SS 1 00.00 21615.13 Planned: CD4-3015"r1wp01 V6 D1WD+IFR-AK-CAZ-SC seCrulN urTnas Sec MIJ Inc nz~ TVD +N/-S +F1-W' IJI.eg TPace VSec Target 1 w.3o ooo n oo sG.3o n on o no 0 00 0.0o n o0 2 3sn(1(1 oon noo 3socro oon o00 oon o00 oon 3 SiO.W IQW Its 00 847 J7 -1839 39 J4 200 11iW 28 s5 J 2769.12 G7 39 107 9R 2282 !,2 -39J G4 1121. 70 3 00 -7 (9 868.77 i 123iG. 17 G7.a9 107.98 5952 G9 -3128.J8 955097 0.00 0.00 7JS'_77 G Iifi2J G7 9022 35152 6915 i0 -I3a05J 11a0R JJ 350 -IfN157 9R7G RR Cf?7-301ST Ic+7i01 TI Snuth 7 2161 sl7 9022 351 s2 GR9230 J3RJ 42 10525 2a 000 (1.00 IIJ799a CW-SOISTIcr~II TI North CD4-302 (CD4-302) From Colour Tc 36 2° 250 5( 500 7` 750 -° 1 f 0 1~ 1 1° 150 1. 1750 2C 2000 2° 2500 3C 3000 t 3~ 5( 6f 7f 8f 9f lC 1~ 14 lE ~~ IF 2C 2° (;DMPANY UF,TAILS CnnncaPhilliPs Alaska Inc linginccn ng mi McOrnJ Minnnum (;urvalure n Svetrin ISCWSn n MathrrJ rrar C'3~lindcr Norh ll~~ Surl:~cc I~:Ilipucal +Cas~ng mg Mclhixl Itulcs HeseJ Cylinder Azimuth (TFO+ALI) ~deg~ vs Centre to Centre Separation ~100ftlin~ 18f~ ' Travelling Cylinder Azimuth (TFO+AZI) Idegl vs Centre [o Cenhe Sevaration f20fUin( 470 13 13 Method:MD Interval: 100.00 From: 11200.00 To: 21615.13 n pth Fm Dep[h To Survey/Plan Tool 3 .30 1000.00 Planned: CDJ-301STIwp01 VS 100.00 21615,13 Planned: CD4-301ST1wp01 VS CB-GYRO-SS MWD+IFR-AK-CAZ~ From Colour To M 36 250 250 500 500 750 750 ~°~~~ 1000 1000 1250 1250 1500 1500 1750 1750 2000 2000 2500 2500 3000 3000 3500 ~0 0 4000 4500 4500 5000 5000 °- y~=~-==° 6000 6000 7000 7000 8000 8000 9000 9000 10000 10000 12000 12000 14000 14000 16000 16000 18000 18000 20000 20000 ~ - ~ -~ 25000 i 7 1065 Travelling Cylinder Azimuth (TFO+AZI) ~deg~ vs Centre to Centre Separation ~ft~ 1 Q ~~ 'x 8 3/4" iPB 1) /4" ~ 7"x 8 3/4" ~ (CD4-302 (CD4-302 1 op.rolor: cono.emuEp. AN.ke Nc. x.ld: coNip. %v.r UnM W.[ CD4blSlivg0l dp: EN/A Svdoc. locaMOn x: a)eva.n n w s+s)su.Ix n Comments: POOL: CD4301ST1wp01 Plan: 15624'to 21615' MD CD4-302: 6799' to 7047.53' TVDss Gdd Cemclien'. -0.9a leb Ne .N/4 Magn.lic D.cEnaXon: 2]. )8 AfE Ne: IN/A Dip: A%NO: IN/A DofM9par IVD Ft Syaf.m(IVDI MNr.nc.: M.m S.a l.v.l Original VS Plane: 66.00 ° r«.nlw.r npn:cw-wI View VS Plane: 66.00 xr~x.gxt ss ao x Vnk SpNm: A%lar.d / iPS S.cxon (VSO MNr.nc.: WEII Plan View o m o 0 0 ~ ~ m ~ ~ ~ ~ ~ ~ ~ ~ P M s D r t D Z ry~ -~~~ ~~ ~--~ J-~" r~ s a 0 6 U 0 N T Vertical Section along "View VS Plane" Closest in POOL :losest Approac h: Reference Well: CD4-301ST1wp01 Plan Offset Well: CD 4302 Coords. - Coords. - ASP ASP -D ctr-ctr Meas. Incl. Subsea N(+)/S(-) View VS Meas. Incl. Subsea N(+)/S(-) View VS iistance. Depth Angle TRUE Azi. TVD E(+)/1/V(-) (66°) Comments Depth Angle TRUE Azi. TVD E(+)IVV(-) (66°) Comments POOL Min Distance POOL Min Distance -~ (5206.46 ft) in POOL .~ ~.,, , (_5206.46 ft) in POOL (15624 - 21615 MD) t~ (15624 - 21615 MD) t CD4-301 ST1wp01 CD4-302 (6799 - Plan (6799 - 7047.53 X6.46 17161 90.22 351.5 6854.67 5957537 389361.8 10296.67 7047.53 TVDss) 9626 42.8 96.16 7047.528 5956849 384204.6 5282.284 TVDss) ~~ G e a~ ro , ~4 . D7 CD4-301ST1wp01 PoolSummary.xls 10/23/2007 4:45 PM CD4-301 Surface Location: ~ CPAI Coordinate Converter ~tul From: - _ _'- _ - - _ _ __--- _ _ To: - _ _ _ _ _ _ Gaban-~: NAD27 f3egion: alaska ~ Datum: hdAD27 ~ Region ala:>1;a i" Latib",de/Longitude: Decimal Degrees ~~~ ~` LakitudelLongitude Decirnal Degrees C'" LITPrI Zane: r~ j-" South ~"' UTM Zone:: True ~ South C State Rlane Zone: 4 ~ Units: us-ft ~ ~ ~ ~ Stafe Plane Zone: 4 ~ Unit.: us-ft w i i ~ {+ Legal Descriptian (NAD27 only) Starting Coonjinates: - Legal Descriptian ?72174.73 Ta~r~nshiP: 1111 hJ ~ Range: 004 E ,r, 535.5,'6.1 Z ~ Meridian. ~~ ~ ,,ectian: ~d FhJL ~ -~^~~'' ,426 FEL ~ 70 0777r~7 I ~~~ :.. ,.,,"..".., Transform "" Inuit Help c'r ~>J4-s v i - - i intermeaiate casin omt: ~~ CPAI Coordinate Converter I- llul~ Fram: - _ - _ _ Dab.rm: pJp,~.,?7 ~ Region: alaska t"" LatitudeiLangit~_ideDecimal Degrees t" UTP.~ Zane: ~ ~' Sauth ~' State Plane Zane: q ~ Units: us_ft (' T a: _ _ _ _ Datum: t•J~,C??7 ~ Region: alaska w (" LatikudeiLor~gib_~de Decimal Degree C' UTM Zane: True I South ' r" State Flane Zane: 4 ~ I Inits: ,u-ft ~' Legal Descriptian (NAD27 onlyl Starting Caardinates: _ _. _ _ _ _ _.. .~ _ ~ ~. Legal Description . ~~ 389559.00 Township: 011 N ~ Range: 005 E Y: 5956001.00 ~ .Meridian: LI ~ Section: 21 -_ _ FNL 4231.7555 FEL 4123.0323 i i t Transform Quik Help ~~` ~ ~ CD4-301 Pilot/Slant BHL: ~. CPAI Coordinate Converter -From: -____ ___.____ _ _ - __--__.~_____.. To.__. __ __ ____ -___ _ _ Datum: hJ,p,GZ' Region: alaska ~ ', Datum: hJADZ7 Region: alasJ:.a • C' LatikudelLangikude pecimal Degrees <` Lakib,rdelLongib-ide pecimal Degrees . t ` UTM Zone: ~- ("` South <' UTM Zane: True J " South Skate Plane Zane: 4 ~ Units: us-ft f' State Plane Zone:. q ~ Llnits: us ft . C` t: Legal Description (N.~Gc7 anlyJ Skarking Coordinates: ---- Legal Desoripkian ~'~s,34~Z.11 Township: 011 N Range: 0G5 E .: 1•~: 5956074.96 Meridian: IJ ~ Section:. ~~~~ _ ~ FhJL 4158.51T FEL 4Z66~,F,y% ~ ~w Transform iluit Help CD4-301ST1 Toe/BHL: ~ CI~AI Coordinate Converter ` ~ ~ b -From: -- _ _ _ - - _ _ _ - . _ __ _~' To: __ _ _ _._ _ - _ _. Dak!.im: PJADZr' Region: alaska . ! ~ [7atum: hJADZ7 Regian 31ak.a • ~' Latituder'Longrtude pecimal Degrees ~ ~ ~ ~"' LatitudefLongitude Decirnal Degrees 3 t ~ IJTh.4 Zane: ~~ ~` Souk#t ~ r' UTM Zane: Tr,ae ~"' South t': Stake Plane Zane: 4 .. Units: us-Ft . t° State Plane Zone: 4 ~ Llnits: us-ft . C' - . _ ~ ~ C. Legal Description I.NADZ7 orJy] Starting Coordinates: - _ _-___: -- _- . _ _ _.,... $ Legal Description _ _ - _ v. •, 3$$772.00. i i I Ta~ronship: 011 PJ Range: 005 E `~~ 5961939.00 I - ! Meridian: U ~ :; ectior~: 1 h I _ ~.~. _ ~- ' j FNL . 35$5.4911 FEL X047.51?n I Transform .. Quik Help ORIGINAL 4 4/3/07 ~ AG ~ GD ~ C.A. ~ UPDATED PER K07041 ACS ~ 3 ~05/12/06~ CZ ~ DB ~ C.A. ~ UPDATED PER K06059ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.24, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FSL FEL GND PAD CD4-201 5,957,273.28 1,518,208.24 70' 17 31.779 150° 59 22.030' 2397' 70 12.4 19.0 CD4-202 5,957,268.38 1,518188.64 70' 17 31.728 150° 59' 22.599 2392' 90' 12.4 19.6 CD4-203 5 957 263.99 1,518 169.26 70° 17 31.681 150° 59 23.162 2387 109 12.4 19.6 CD4-204 5,957,259.26 1,518,149.87 70' 17 31.632 150° 59 23.725" 2382 128' 12.4 19.5 CD4-205 5,957 254.43 1,518,130.28 70' 17 31.581 150° 59' 24.293 2377' 148 12.4 19.5 CD4-206 5 957 249.76 1 518 110.87 70' 17 31.532 150° 59 24.857' 2372 167 12.4 19.6 CD4-207 5 957,245.29 1 518 091.49 70' 17 31.485 150° 59' 25.419 2367 186 12.4 19.7 CD4-208 5,957,240.13 1,518,071.80 70' 17' 31.431" 150° 59' 25.991 2362' 206' 12.4 19.8 CD4-209 5,957,235.77 1,518,052.15 70' 17' 31.385" 150° 59 26.561" 2357 226' 12.4 19.7 CD4-210 5 957 230.92 1 518,032.98 70° 17 31.334 150° 59 27.118 2352 245 12.4 19.6 CD4-211 5,957,226.94 1,518 013.75 70° 17 31.292 150° 59' 27.676" 2348' 264 12.4 20.0 CD4-212 5,957,222.25 1,517,994.40 70' 17 31.243' 150° 59 28.238" 2343 283' 12.4 19.6 CD4-213 5 957 217.19 1 517 974.60 70' 17' 31.190" 150° 59' 28.812 2337' 303 12.4 19.9 CD4-214 5,957,212.46 1,517,955.51 70' 17 31.140 150° 59 29.367 2332' 322 12.4 19.8 CD4-215 5,957,208.07 1,517,935.87 70' 17 31.094 150° 59 29.937 2327' 341' 12.4 19.8 CD4-216 5,957,203.17 1,517,916.63 70° 17 31.043 150° 59 30.495" 2322 361' 12.4 19.5 CD4-217 5,957,198.80 1,517,897.14 70° 17 30.997 150° 59 31.061 2318 380 12.4 19.5 CD4-318 5,957,193.71 1,517,877.38 70' 17 30.944 150° 59' 31.634 2312' 400 12.4 19.6 CD4-319 5,957,189.64 1,517,857.90 70' 17 30.900 150° 59' 32.200 2308' 419 12.4 19.7 CD4-320 5,957,185.03 1,517,838.65 70' 17 30.852 150° 59 32.759" 2303 438' 12.4 19.7 CD4-321 5,957,180.22 1,517 819.26 70° 17 30.802 150° 59 33.322 2298 458 12.4 19.0 CD4-X22 5,957,175.24 1,517,799.90 70' 17 30.749" 150° 59 33.884" 2292 477' 12.4 19.0 CD4-X23 5,957,170.76 1,517,780.38 70' 17' 30.702 150° 59' 34.450 2288' 496 12.4 19.0 CD4-X24 5 957 166.23 1 517,760.82 70' 17 30.655 150° 59 35.018" 2283 516' 12.4 19.0 CD4-X25 5 957 161.34 1 517 741.31 70' 17 30.603 150° 59 35.584' 2278 535' 12.4 19.0 CD4-X26 5,957 157.10 1,517 721.97 70' 17' 30.558" 150° 59' 36.146" 2273' 554' 12.4 19.5 CD4-227 5,957,151.94 1,517,702.56 70° 17 30.505 150° 59 36.709 2268 574 12.4 19.6 KUUKPIK NOTES: ~' 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. ~~~Ita+C 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) °'~"` ""'°""`"`°°°' "°"~'"°~ Alpine Survey Office ~r~ ALPINE MODULE: CD40 UNIT: CD C~noc~Phillips ALPINE PROJECT CD-4 WELL CONDUCTORS Alaska, InC. AS-BUILT LOCATIONS CADD FILE N0. DRAWING N0: PART: REV: 05-03-03-1B-2 10/11 /05 ~ ~ a ,~, w ,w GE~r~D40-121 2 OF 3 4 • • TRAYS1dIIT'fAI. LE~'TEIa,C/~IECKLIS'I' WELL NAME (;~~ ~~ 7" '~ PTD# Zoe - ~ SD r! Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT ~ (OPTIONS) APPLIES L j MliLTI LATERAL ~ 'The permit is for a new wellbore segment of existing ~ ~ ~ well (If last two digits in I Permit ~(o. , API No. 30- - - API number are ; I 'between 60-69) ;Production should continue to be reported as a function of the original AP[ number stated above. PILOT HOLE [n accordance with 20 AAC 25.005(f), all records, data and logs ~ !acquired for the pilot hole m t be clearly differentiated in both d API b ~ PH ~D ~ 3~ j i num er ) an _ ~ well name ( ~2G( I ~ ~ (50- /O -_ ?O ~'S'7 -~ from records, data and logs ~ ~ acquired for well _ G,t?GC Cpz/ 3-yf i SPACING The permit is approved subject to full compliance with 20 AAC 'EXCEPTION ~ 23.0>j. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing j exception. assumes the ~ ~ I ~ I liability of any protest to the spacing exception that may occur. a ,DRY DITCH ;All dry ditch sample sets submitted to the Commission must be in i i SA!~IPLE I no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals j ,through target zones. ,Please note the fol owing special condition of this permit: , Non-Conventional production or production testing of coal bed methane is not allowed Well ~ for (name of we!!) until after (Com~anv Name) has designed and implemented a water welt testing program to provide baseline data I I on water quality and quantity. Company Name) must contact the 'Commission to obtain advance approval of such water well testing j j ~ program. I Rev: ('2~i06 C:'jody~transmittaf_cfiecklist • s Y - 7 ~ : ~ Q3 N I ~ ~ a°'i o ~ Y ~ Q ~ Z, ~ Z: N' w~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ : ~ C c ~: c: ~, a~ o 3. oa ~ ~° ~ a' ~ ~ O c, o. ~ ~ N i ~ .~ ~v3 m , ~, w: N L O C N N E ~ O Z' ~ O O, ~, a N, y, U 7 O ~ ~ ~ ~~ ~ ~~ O: ~ ~ ~ ~ ~ ~ ~ ~ ~ a: ~ Y: ~ f6. ~ ~ ~ ~~ N, 4 7. N, ~ N f6 E O c ~ v. a~ ° ~ o, N: rn o ~ ~ 0 s ~~ cu v t m a~ m ~~ ~ N. D; > N : ~ ~: ~ d o: d T 4 ~ 3: d N. Ll ~. m ~~ m O ~ ~ O. ~: ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ N. ~ O: ~ O~ ~ ~ ~ b. b: W. ~ O' U! d : o' ~ p ~, o y V) c' c' N. ~ ~ ~ ~ ~ ~ ~ ~ ~ O, ~ ~ 00. ~, ~ b. ~ ~ ~ ~~ N. u M~ d ~ L. • N t f0 d b o. ao~ a 3, ~ un ' O. o. c ca ~ ~ a~ ~a U c L o ~~ ~ 3, ° S ~ a~ v o M d c ~' ~' s ~ ~ ~ ~ ~ ~ m' ~ c' ~ ~ ~ N' a - ~ ~ c ~ o ~ __ o o 3' o: ~ ~ c an a. ~ U a~ a ~ ~ -o; ~ `n _ ~~ ~' in ~~ a~' ai of c' c' N, o: i ~ ~ ~ ~ ~ v. ~ ~, 3 , ~: ~ ~~ ~ ~ ~ ~ '3. ~ _ ~ 3, o a~, ,~~ y w ~ m N ~ ' ~ M' a U ~ ~ b m. ~ c. , ~ uy: ~ , ~ fl. I ~ 3~ w 0 J ~ ~ n , a a m ; a ~ W d '~ j' fl. ~ ~ o Q. ~ N ~ ~ .~ v ~, ~ ~ ~ °~ ~ s ~ 'a o' I o, ,o D ~ o a~ •~ ~ a ~ v. ~ r. r. a ~ ~ •,~, ~ c' ~ ~ o, ~ .~ ' ~ ~, d o a ~ ~ J: ~ M• M• M• N• ~ ~ ~ 7, ~ G ~ ~ a. Z. O• y, O, N• O, 7• ~ c O n c• a o. o 0 3' °: c ~, o ~ ~ N N p; c, N, ~ b a> j' J p 0 O U Z Z Z C ~ ~ Q: ~ ~~ ~ ~~ ~ j, O. ~~ N. ~ ~ ~ a: Q 4T ~ C L ~ p p ~ , ~ ~ ~ • ~ ~ ~ ~ d ~ QA ~ ~~ ~ ~ C• ay •0~ ~ ~ ' O w f6 a: ~ N. , ~~ ~~ T ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ `m c ~ N ~ c. N• > ~ ' .~ j , ~~ ~: o. `p ~ C a a~ T 3 ~ o. O ~ ~ m ~ ~ ~ ~ a~ a p ~ ~ ~ ~ ~ ~ N• ~ : ~ d ~ ~ ~~ , ~ ~ ~ N~ ~ a~ ~~ ~ _ m O 't' ~' >' c c' c o, ~ a~, R. o, •X. U U U m N' m. O w a > > Z 7~ D. O, O. O• O .r: ~ ~ O• ~ ~ O, ~ ~ ~ O, _A c4 ~ Q• ~ ~ N• N• Xr ~p~ ~~ 2 c w U Q U U U U o Z U ~ ~~ ~ ~ ~ w H c 3 ) a . ' ' , , O~~ W ~ , ~ , , , d ~a ~ 0 ~ : ~ ~ I Q', uNi; a '' a m m a '' a ' aNi; aNi; a ' a ' aNi Q, Q; Q, Q', I ayi; Q aNi; ' o; o' ' m a d ' ' ' aNi; Q aNi; ' aNi' a ~ ' ' aNi; o' Q' ' ' aNi; aNi; Q' Q; ' Q n Z. r r, }, }, >' ~; ~ , ~ >- >- ?•; ~ z z Z Z, i >- Z ~ z Z Z >- >- ~, Z ~ ~ ~ ~; Z ~ Z ~ >- z Z z ~ ; ` ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ` ° y ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ m ~ ! ~ U ~ a ; \ ~ •~ ; ; c E - 3 ; - E. ~, : ~ ~ ~ : Z : ~ a~ N , ,n O. o ~ W N ~ ~ ~ ~ ~ ~ ~ ~ ~' C L• ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ p ~ ~ ~ d `- O. O ~ 3. ~ 3, o. ~ ~ ; O. ~, ~ c ~: a ~ : Y ~ ~ ~° ~ ~ ~ ~ ~ ~ w o Q a o ~~ ~ , ~, ~ ~ ~ ~ ~ a . i~ a i~ ~ ~ ~ ~ t/ ~ ~ ~, ~ ~ ~ ° ~ _, ~ , ~. ~ ~ N~ N ~ \ O~ ~ ~ ~ ~ O. ~ c~ ~ ~ C O ~ 2 ~ ~ 7. N, ~ ~ • y •~ .N. C: ~, p ~ N~ O, 7~ ~, ~~ ~ C, ~ : f6 ~ O >~ ' N. ~ ~ c 3. ~~ C o. ~ 3 ~ ~; a Mo ~ ~ o ,N, a a ; o: :~ ~ d ~ o, ~ N a ~, , N ~ U _ s rn ~~ w m ~ 3. ~: ~, c, ~' rn ~: as; E' ' a a> o Vl' ' ` o, ~ 7' Q' ~ ' N vi _ ' ' Z ~ ~ -a' w0, C. -O. ~ O. N' ~~ a f6. ,N: O d ~ ~' U: c. O, C m. ~ O. 7 O O: p~ 4Y ~ d' ~ O, N • N N O, G ~, p w Q ~ ~ a c c E ~ ~ O M' C' ~' c O ~ USA y ~~ ~~ N w~ C N~ d N ~ O: C Y ~ O "~ , ~ O b N O ~~ Q~ U' ~ U' a C O' O ~ ~~ > J (A ~ N p, ~ ~ p c, O . ~ . 7 O w . 'O f6 ~ C. N. Y C a (0. N O' (6' (6' f9 Q' ~ ' Y ~ ~ U ~ N j Q Q N ~ N L L NQ C N N C ~ ' 3' . , : m, c: ' N N ~, , . m, o, d m • • . a ~ 14 , a. E, `' v N: ' ' ~ C , N' y ~' m : o ' t ,~: ~ , O N' ~ o O Q ?i' ,~: O C , ~ ~ o c w o o UI nl Q .°, c, w, in; • `a a ~~, °, a, ~~ 3, 3, a i o 01 ~ -_ .. p. o 'v. > ~ «. ~ 3 ~ o ° ~ `t~ o a ui: a~ ~~ 4 a ° ~ N ~ m. o. 3 o t ~~ w U ~ d ~' a~ o, ~: d , ~ , ' ~ ~ ~, o, ~ a~, ~ o: ~: ~~ ' ~~ c' ~~ ~ c~ ~ o. o: a a o , Y. v ~ ° ° ~, ~, - ~ ~ ° o' o~ rn c~ ~ U .o a~ ~ Q N~ ~ N. o' ~ , ~ ~ =~ d N: a d d N N 4 ~ N~ o N~ d d ~: N. U. ~ ~ - N• N b ~ ~ C, U, _ ~ N, 3 N~ c O S U. O, ~: O O. O. ~ N ~~ 4 .~~ .N~ N ~~ c. M, O) 0- c6 N N, O f0. O ~~ ~ ~~ ~ T 2. a .N~ a, N' O, d N Q 1''• ~, ~: .~: d d ~~ N• ~ y~ N• N• N 3. ~: a' W G C 6 Q O: C. ~~ ~ 3 Q ~~ ~. p, 3 p, O. ° N• ~, >, "" ~~ 'u. UI o' ~, -~ ~ m; m ~ c' o, a. .Q a a. ~: d c' ° _ ~'' N' a a o .N? ~, s. 3. ~ a; o N, .~, ~, o, ~ c. ca ~. ~ O a~' E ar ~ ; , , m m m -o' o. ~ c. m c, ~ E ~ 3~ o a~' m. `o' v `6 m' °: - m = -° ~ m o, ° m. v - c. m an c. o N m v m. c ~ ~ Z , : m. ~ c o: , : . v v v o: o, ' ~, ~ ~, m. 0 `o' . v v ~ m. v ui a> o. c. , . ~ a~ o, o -: - ' ~? a m. 'o. w: ,~, m' m, a, a E' ui - , c: 3, a~ c' ' , o o, ~ b, ~ ~ O ~ m ~: o v. ~> ~ ~, ~ d a a~: a o ~ ° > > 3 ~? ~ m. ° a~, c w. w, ~ N `° ~ a o ~ ~i Y >, m. a~, m, m, a~ o, p \ w a O ~ N M V ~ (O I~ W O O ~ N M~ t!7 (O I~ W O O ~ N M~ u'1 CO I~ W p ~ ~ N M _- ~? ~ f0 I~ W O ~ ~ ~ ~ ~ _~ ~ ~ ~ ~ N N N N N N N N N N M M M M M M M M M M U f- U ~ o __ .______.__ -._ _.__ -.____._____ ____ r 0 ~ __.. .__ ~ 0 " ~ C 'a0--~ r ~ o N N ~ ~ y ~ o N M i o r N ~ N a~ C'/~/ U C O y w ~ R O , C ~ O ' O p' a O N N ~ ~ ~ O J ~ o C E a ~ c 'rn a ~ ° o, ~ U w ~ a a d a w ~ w d a w F- o ~ a.w ¢<n Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulaled at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • cd4-301.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Mar 11 13:43:41 2008 Reel Header Service name .............LISTPE Date . ...................08/03/11 Ori9in ...................5T5 Reel Name. .... ........UNKNOWN continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date . ...................08/03/11 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Colville River MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 J. BOBBITT D. BURLEY SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD ~o~-~~ i scientific Technical services scientific Technical services CD4-301 501032055700 ConocoPhillips Alaska, inc. Sperry Sun 11-MAR-08 24 11 4 E 2882 70 .00 55.90 19.00 Page 1 /(Olo~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: • OPEN HOLE BIT SIZE (IN) 8.750 cd4-301.txt CASING DRILLERS SIZE (IN) DEPTH (FT) 9.625 3035.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 WAS DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 4. MWD RUN 2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTRONMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-Phase 4), GEOPILOT ROTARY-STEERABLE BHA (G P), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AT-BIT GAMMA (ABG), PRESSURE WHILE DRILLING (PWD) AND ACOUSTIC CALIPER (ACAL) . 5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT CONOCO-PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. DOUG KNOCK (CPAI) CONFIRMED THAT THIS WOULD ALSO BE THE CASE FOR THE DRILLSITES 3 AND 4 WELLS IN A PHONE CONVERSATION WITH BUSTER BRYANT (SDS) ON 27 APRIL 2005. 6. MWD RUNS 1-2 REPRESENT WELL CD4-301 WITH API#: 50-103-20557-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15883'MD/6913'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING).. SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). Page 2 ~ • cd4-301.txt PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: ACAL-DERIVED (8.75~~ BIT) AVG OFFSET: ACAL-DERIVED MUD WEIGHT: 9.6 PPG MUD SALINITY: 300 - 450 PPM CHLORIDES FORMATION WATER SALINITY: 14545 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR ROP AND GAMMA RAY, WHICH ARE BOTH SMOOTHED TO A 1.1 FT WINDOW. ALL DATA HAS A GAP FILL OF 5 FT APPLIED. File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/11 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH DRHO 3009.0 15810.0 NPHI 3009.0 15796.0 RPX 3009.0 15832.5 PEF 3009.0 15810.0 NCNT 3009.0 15796.0 RPS 3009.0 15832.5 RPD 3009.0 15832.5 RHOB 3009.0 15810.0 RPM 3009.0 15832.5 GR 3009.0 15845.5 FCNT 3009.0 15796.0 FET 3009.0 15832.5 ROP 3046.0 15883.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 3009.0 15883.0 REMARKS: MERGED MAIN PASS. Page 3 • cd4-301.txt Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 RPX MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 FCNT MWD CP30 4 1 68 24 7 NCNT MWD CP30 4 1 68 28 8 RHOB MWD G/CC 4 1 68 32 9 DRHO MWD G/CC 4 1 68 36 10 FET MWD HR 4 1 68 40 11 PEF MWD B/E 4 1 68 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD Pu 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3009 15883 9446 25749 3009 15883 GR MWD API 47.96 474.81 121.168 25674 3009 15845.5 RPX MWD OHMM 1.26 1125.91 6.36958 25648 3009 15832.5 RPS MWD OHMM 1.5 1207.86 6.57521 25648 3009 15832.5 RPM MWD OHMM 0.42 2000 9.05224 25648 3009 15832.5 RPD MWD OHMM 0.44 2000 11.6688 25648 3009 15832.5 FONT MWD CP30 525.14 2193.56 1020.98 25575 3009 15796 NCNT MwD CP30 99438.6 166693 130022 25575 3009 15796 RHOB MWD G/cc 1.212 3.326 2.4018 25603 3009 15810 DRHO MWD G/CC -3.738 0.232 0.0355024 25603 3009 15810 FET MWD HR 0.19 67.56 0.642808 25648 3009 15832.5 PEF MwD B/E 1.84 13.97 2.86945 25603 3009 15810 ROP MWD FPH 6.74 482.85 183.131 25675 3046 15883 NPHI MWD Pu 15.46 59.47 31.8232 25575 3009 15796 First Reading For Entire File..........3009 Last Reading For Entire File...........15883 File Trailer Service name... .......STSLIB.001 Service Sub Level~Name... version Number. ........1.0.0 Date of Generation.......08/03/11 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.002 Page 4 • cd4-301.txt Physical EOF File Header service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/11 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FONT 3009.0 15796.0 PEF 3009.0 15810.0 FET 3009.0 15832.5 DRHO 3009.0 15810.0 RHOB 3009.0 15810.0 NPHI 3009.0 15796.0 NCNT 3009.0 15796.0 RPD 3009.0 15832.5 GR 3009.0 15845.5 RPM 3009.0 15832.5 RPS 3009.0 15832.5 RPx 3009.0 15832.5 ROP 3046.0 15883.0 LOG HEADER DATA DATE LOGGED: 18-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Incite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING.SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.9 MAXIMUM ANGLE: 86.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 120557 EWR4 ELECTROMAG. RESIS. 4 145654 CTN COMP THERMAL NEUTRON 174114 ASLD Azimuthal Litho-Den 143783 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.750 DRILLER'S CASING DEPTH (FT): 3035.0 Page 5 cd4-301.txt BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Fresh water Gel 9.70 37.0 9.1 350 7.4 6.000 69.0 3.035 143.0 10.000 69.0 5.000 69.0 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 RPX MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPM MWD020 OHMM 4 1 68 16 5 RPD MwD020 OHMM 4 1 68 20 6 FONT MwD020 CP30 4 1 68 24 7 NCNT MwD020 cP30 4 1 68 28 8 RHOB MwD020 G/CC 4 1 68 32 9 DRHO MWD020 G/CC 4 1 68 36 10 FET MwD020 HR 4 1 68 40 11 PEF MWD020 B/E 4 1 68 44 12 ROP MWD020 FPH 4 1 68 48 13 NPHI MwD020 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3009 15883 9446 25749 3009 15883 GR MWD020 API 47.96 474.81 121.168 25674 3009 15845.5 RPX MWD020 OHMM 1.26 1125.91 6.36958 25648 3009 15832.5 RPS MWD020 OHMM 1.5 1207.86 6.57521 25648 3009 15832.5 RPM MWD020 OHMM 0.42 2000 9.05224 25648 3009 15832.5 RPD MWD020 OHMM 0.44 2000 11.6688 25648 3009 15832.5 Page 6 cd4-301.txt FONT MWD020 CP30 525.14 2193.56 1020.98 25575 3009 15796 NCNT MWD020 CP30 99438.6 166693 130022 25575 3009 15796 RHOB MWD020 G/CC 1.212 3.326 2.4018 25603 3009 15810 DRHO MWD020 G/CC -3.738 0.232 0.0355024 25603 3009 15810 FET MwD020 HR 0.19 67.56 0.642808 25648 3009 15832.5 PEF MwD020 B/E 1.84 13.97 2.86945 25603 3009 15810 ROP MWD020 FPH 6.74 482.85 183.131 25675 3046 15883 NPHI MWD020 PU 15.46 59.47 31.8232 25575 3009 15796 First Reading For Entire File..........3009 Last Reading For Entire File...........1588 3 File Trailer Service name... .......STSLI6.002 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/11 Maximum Physical Record..65535 File TyPe ................LO Next File Name...........STSLIB.003 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/03/11 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS writing Library. scientific Technical services Reel Trailer Service name .............LISTPE Date . ...................08/03/11 Ori9in ...................STs Reel Name. .... ........UNKNOWN continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS Lis writing Library. scientific Technical services Physical EOF Physical EOF End Of LIS File Page 7