Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-086
1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 12,956 feet N/A feet true vertical 10,746 feet N/A feet Effective Depth measured 11,670 feet 10,312 feet true vertical 10,312 feet 9,610 feet Perforation depth Measured depth 10,555 - 11,560 feet True Vertical depth 9,800 - 10,261 feet 2-7/8" 6.5 / L-80 Tubing (size, grade, measured and true vertical depth)3-1/2" 4.7 / L-80 10,501 (MD) 9,760 (TVD) 10,312 (MD) 359 (MD) Packers and SSSV (type, measured and true vertical depth)DHL Hyd Ret 9,610 (TVD) TRSV-NE 359 (TVD) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Contact Name: Contact Email: Authorized Title:Contact Phone: 3,090psi 7,020psi 3,090psi 5,750psi 8,160psi Burst Collapse 1,540psi 599' 3,973' 6,616' 8,151' 5" 6,643' 8,495' 11,800' 10,376' 7" measuredPlugs Junk measured N/A Length 294' 600' 3,989' Size Conductor Surface Production 26" 18" 13-3/8" 9-5/8" Liner Liner 6,643' 2,135' 5,621' Casing STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 217-086 50-733-20095-03-00 N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0018761 Granite Point Field / Middle Kenai Oil Pool 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Granite Pt St 22-13RD3 Hilcorp Alaska, LLC Other: Convert to Injector measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 000 0 4 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf MD 294' 600' 3,989' N/A 0 Conductor TVD 294' 321-229 Sr Pet Eng: 13,830psi Sr Pet Geo: Sr Res Eng: Authorized Name and Digital Signature with Date: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 0 0 9,910psi Katherine O'Connor Katherine.oconnor@hilcorp.com Dan Marlowe - Operations Manager L G Form 10-404 Revised 10/2021 Submit Within 30 days of Operations By Samantha Carlisle at 9:19 am, Nov 02, 2021 Digitally signed by Dan Marlowe (1267) DN: cn=Dan Marlowe (1267), ou=Users Date: 2021.11.01 15:51:40 -08'00' Dan Marlowe (1267) BJM 11/9/21 SFD 11/8/2021 RBDMS HEW 11/8/2021 DSR-11/2/21 Updated By: JLL 10/29/21 SCHEMATIC Granite Point Platform Well: Granite Pt St 22-13RD3 Last Completed: 09/22/17 PTD: 217-086 API: 50-733-20095-03 PBTD: 11,670’ TD: 12,956’ 2 26” 5” MAX HOLE ANGLE = 67.84ȗ @ 11,002’ C-6 TOC @ 8,770’ 6 7 8 13-3/8” 9-5/8” 1 5 TOC @ 8,362’ 18” 7” 4 3TOC @ 5,864’ X KB = 42.3’ or 115’ RKB from MSL CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515” Surf 3,989' 9-5/8" 40 N-80 BTC 8.835” Surf 6,409’ 43.5 N-80 BTC 8.755” 6,409’ 6,643’ TOW 7" 29 L-80 BTC 6.184” 6,360' 8,495’ (TOW) 5” 23.2 L-80 Hydril 513 4.044” 6,179’ 11,800’ TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441” Surf 6,112’ 2-3/8" 4.7 L-80 8rnd EUE 1.995” 6,112’ 10,501’ PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Comment C-6 10,555’ 11,560’ 9,800’ 10,261’ 1,005’ 09/22/17 Open 3-1/8” 6 spf JEWELRY DETAIL No Depth (MD) Depth (TVD)ID OD Item 49’ 49’ Tubing Hanger 1 359’ 359’ 2.313 4.910 SCSSV – Halliburton TRSV-NE 2 2,494’ 2,485’ 2.441 4.750 GLM #1 PSPO-1M Mandrels, R-1 – (Dummy Valve) 4,327’ 4,310’ 2.441 4.750 GLM #2 PSPO-1M Mandrels, R-1 – (Dummy Valve) 5,717’ 5,697’ 2.441 4.750 GLM #3 PSPO-1M Mandrels, R-1 – (Dummy Valve) 3 6,112’ 6,089’ 1.995 3.700 Crossover 2-3/8 EUE 8rd x 2-7/8 EUE 8rd 4 6,739’ 6,711’ 1.995 3.330 GLM #4 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 7,473’ 7,403’ 1.995 3.330 GLM #5 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 8,240’ 7,996’ 1.995 3.330 GLM #6 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 9,006’ 8,503’ 1.995 3.330 GLM #7 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 9,609’ 9,013’ 1.995 3.330 GLM #8 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 10,213’ 9,527’ 1.995 3.330 GLM #9 GLMAX-1HP Mandrels, RO01 – (Dummy Valve) 5 10,262’ 9,569’ 1.975 3.669 Halliburton ROC Gauge Mandrel w/ 0.25” TEC wire 10,271’ 9,576’ 1.970 3.210 RA Marker Sub 6 10,312’ 9,610’ 1.925 3.750 4-1/2” DHL Hydraulic Retrievable Packer 7 10,331’ 9,626’ 1.875 2.730 X Nipple 10,501’ 9,760’ 1.935 3.155 Ported Sub 10,541’ 9,790’ N/A 3.125 Mechanical Firing Head 8 10,556’ 9,801’ N/A 3.125 TCP Assembly (3-1/8 6 SPF RDX Super DPTCP Guns) 11,562’ 10,262’ N/A 3.125 Lower Firing Adapter 11,563’ 10,262’ N/A 3.125 Absolute Pressure / Time delay Firing Head Rig Start Date End Date Slickline 5/20/21 10/4/21 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name Granite Pt St 22-13RD3 50-733-20095-03-00 217-086 Confirm fluid packed. Begin to pressure up the IA to confirm, IA holding then started to drop slowly 7 minutes into test before dropping quickly at 10 minutes with a corresponding increase in tubing pressure. Suspect that one of 9 dummy valves lost seal or is out of pocket. Arrive @ PWL, gather tools, depart for OSK. Flight Departing OSK. Safety meeting, talk w/ company rep, sign permits. TGSM. Rig up on well. PT 1500 PSI- PASS. Rih w/ 2 3/8 Daniels KOT w/ 1 1/4 RB to 10,223' kb, latch valve, have to jar free 30 X, pooh. Ooh w/ valve missing 1 piece of packing. Rih w/ Kot w/ slim jk w/ 1" Dummy w/ tk latch to 10,223' kb, set station #9, pooh, ooh no valve. Rih w/ Kot w/ 1 1/4 SB to 9618' kb, can locate but cant set down, w/t pull up to station #7, latch valve @ 9018' kb, pooh, ooh w/ station # 7. Add kj above KOT, Rih w/ KOT w/ 1 1/4 SB to 9625' kb, latch valve pooh, ooh w/ station #8 Rih w/ Kj, KOT w/ jk w/ Tk latch 1" Dummy to 9625' kb, set dummy in station #8, pooh, ooh no dummy. Ooh w/ tools, prepare tools for next day, lay down for the night. 05/22/2021 - Saturday Lube and bleed ~ 460 bbls of filtered inlet water into the IA. Stage in ~ 4 bbls corrosion inhibitor while fluid packing. Production crews changed out. 05/26/2021 - Wednesday 05/23/2021 - Sunday Morning Safety meeting, talk w/ company rep, sign permits. TGSM. Rih w/ 2 3/8 Daniels Kot w/ slim line jk w/ T-1 latch w/ #7 Dummy to 9018' kb, set dummy, pooh, ooh no dummy. Rih w/ Kot w/ 1 1/4 SB to 8255' kb, w/t jar 5X, pooh, Ooh w/ station # 6. Rih w/ Kot w/ slimline jk w/ Station # 1" 6 dummy w/ t-1 latch to 8255' set dummy pooh, ooh no dummy. Rih w/ Kot w/ 1 1/4 SB to 7485' kb, latch station ja. Rih w/ Kot w/ 1 1/4 SB to 6751' kb, latch valve pooh, ooh w/ Station #4. Rih w/ Kot w/ Slimeline Jk w/ Station # 4 1"dummy to 6751' kb, set dummy, pooh, ooh no dummy. Rih w/ 2 7/8 Daniels Kot w/ 1 1/4 JDS to 5731' kb, latch valve, pooh, ooh w/ station # 3. Rih w/ Kot w/ jk w/ 1" bk dummy to 5731' kb, set dummy in station # 3, pooh, ooh no dummy. Rih w/ Kot w/ 1 1/4 JDS to 4337' kb, pull valve, pooh. Rih w/ Kot w/ 1 1/4 JDS to 2496' kb, latch valve pooh, ooh w/ Station # 1 valve. Rih w/ Kot w/ jk w/ 1" bk station # 1 dummy to 2496' kb, set dummy pooh, ooh no dummy. Rih w/ 2 3/8 Gs to 10,254' kb, latch AD-2 stop, pooh, chain breaks while Pooh. Fix chain, pooh, ooh w/ Ad-2 stop.Ooh rig down. 05/25/2021 - Tuesday Morning Safety meeting, talk w/ company rep, sign permits. TGSM. Move equipment over form 44-14, begin rigging up on well. PT 1500 Psi- GOOD. Rih w/ 2.3 G-ring to 6018' kb, tag Xo, pooh. Rih w/ 1.89 G-ring to 10,336 'kb, tag x nipple pooh. Rih w/ 2 3/8 Gs w/ 2 3/8 X-lock (no keys) w/ flow through sub w/ 1.89 G-ring on bottom to 10,336' kb, w/t fall through jar out, pooh, ooh w/ bait sub. Rih w/ same w/ 1.95 G-ring to 6018' kb, set down on Xo, attempt to work past, shear tool pooh. Rih w/ 2 3/8 Gs to 6018' kb latch catcher sub, pooh. Rih w/ 2 3/8 gs w/ 2 3/8 AD-2 stop pinned w/ brass to 10,252' kb, set stop pooh. Ooh sheared. Ooh w/ tools, rig down off well. Flight departing GPP for OSK. ETA PWL. 05/20/2021 - Thursday set dummy in station # 3, pooh, ooh no dummy. , ooh w/ station #8 Ri Begin to pressure up the IA to confirm, IA holding then started to drop slowly 7 minutes into test before dropping quickly at 10 minutes with a corresponding increase in tubing pressure. S y to 9625' kb, set dummy in station #8, Dummy Rig Start Date End Date Slickline 5/20/21 10/4/21 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name Granite Pt St 22-13RD3 50-733-20095-03-00 217-086 Arrive at PWL shop Pickup Crew and TOOLs Travel to OSK. Arrive at OSK do Covid testing- pass. Arrive on Platfrom do Permit and JSA. Pre wireline meeting with Production. Move basket of tools from heliport. Rig up Slickline. Standby to pickup lub. Boat inbound- standby for crane to work boat. P/T LUB 2500 PSI Fail 3 times- c/o orings - then test 4th time PASS. RIH/w 2.29" Gauge Ring to 6093' SLM (6112' RKB 19' Correction) tag 2 3/8" X/o tubing Clear. POOH. Boat inbound. Lay down Lub and Standby (two boats for crane to work). Pickup Lub and make up tools. RIH/w 2" RB/w 2 7/8" DD holefinder to 6070' SLM (6089' RKB) w/t set. Standby for production to fill tubing and test. Fill 22 bbls pressure up to 1000 psi bleed off 100lbs over 20 mins- bleed gas. Cap off lub and retest to 1000 psi, lose 2.2lbs a min over 30 mins. Bleed down tubing standby for fluid to drop thru equalizing port. Unseat holefinder and POOH. Hang up at SSSV w/t free element is swelled. OOH. Lay down for the night. 08/28/2021 - Saturday Attend Morning Meeting- do Permit and JSA. Start Moving Equipment over to other leg and spotting- discover riser to short - talk with Mike D. have boat pickup a stick from the bruce and bring over. Boat arrive Stab up to wellhead with Riser and pickup lub - stab on and prep for P/T,P/T Lub 2500 HIGH -fail 3 times c/o orings- pump to 2500 PASS. RIH/w 1.75" Gauge ring to 10400' SLM Clear POOH. RIH/w 2 3/8" Daniels KOT/w 1.25" LIB to 10250' SLM try to locate up to 10150' SLM can not POOH. RIH/w 2 3/8" OK-6 Kot/w 1.25 LIB to 10197' SLM (10213" RKB 16' correction) locate w/t pooh ooh/w impression of latch (GOOD station 9). RIH/w 2 7/8" OK-5 KOT /w 1 .25" LIB to 5703' SLM (5717' RKB 14' Correction) locate w/t pooh ooh/w impression of latch (GOOD station 3). RIH/w 2 3/8" OK-6 Kot/w 1.25" LIB to 9595' SLM (9609' RKB) Locate w/t pooh ooh/w impression of latch (good Station 8 ). RIH/w 2 7/8" OK-5 KOT/w 1.25" LIB to 4311' SLM (4327' RKB) locate w/t pooh ooh/w impression of latch (good station 2). RIH/w 2 3/8" OK-6 KOT/w 1.25" LIB to 8994' slm (9013'RKB) Locate w/t Pooh ooh/w impression of latch ( Good station 7). RIH/w 2 7/8" OK-5 KOT /w 1.25" LIB to 2471' SLM (2494' RKB) locate w/t pooh ooh/w impression of latch (good Station 1). Lay down Lub for the night secure area and wellhead. 08/29/2021 - Sunday Attend Morning Meeting- do Permit and JSA. Rig up Slickline. P/T LUB and WLV 2500 PSI PASS. RIH/w 2 3/8" Daniels KOT /w JK R/T to 8250-to 8210' SLM can not locate try station 5 and 4 on pooh cant locate POOH. RIH/w 2 3/8" OK-6 KOT/w Jk RT to 8226' SLM locate w/t set down POOH OOH/w pins not sheared. RIH/w 2 3/8" OK-6 KOT w/ 1.25" LIB to 8226' SLM (8240' RKB)w/t locate w/t POOH Impression of Latch (station 6 good). RIH/w 2 3/8" OK-6 KOT /w JK R/T to 7459' SLM (7473' RKB) w/t POOH OOH/w Good shears (station 5 good). RIH/w 2 3/8" OK-6 KOT /w JK R/t to 6725' SLM (6739' RKB) w/t pooh OOH/w good shears(station 4 good). Talk with Production for Plan Forward- going to fill with Fluid to test- Rig off and move to 32-13. 10/02/2021 - Saturday Rig Start Date End Date Slickline 5/20/21 10/4/21 Daily Operations: Hilcorp Alaska, LLC Well Operations Summary API Number Well Permit NumberWell Name Granite Pt St 22-13RD3 50-733-20095-03-00 217-086 10/03/2021 - Sunday Attend Morning Meeting with Production. Rig up slickline, P/T LUB 2500 PSI Pass. RIH/w 1.75" Gauge ring to 10331' RKB( 10312' SLM with 19' c/f) no drift issues POOH. RIH/w 2" RB/w 2 3/8" DD Holefinder to 10286' SLM ( 10306' RKB) w/t set. Standby for tubing to be filled, pressure up to 1234psi down to 1136 psi over 25 mins. Discuss next part of job scope with production. Fill backside of tubing and attempt to pressure up to the Packer. Standby while Filling Backside with Fluid. IA Pressuring up and Losing Pressure. Standby while Production tests and moves tubing and Casing Pressures to verify if packer leaking. Secure unit and Clap Wire for the night while Production moves pressure around IA and Tubing starting to see IA build some. 10/04/2021 - Monday Attend Morning Meeting with Production. Morning meeting covering well, appears casing still taking fluid at 16 gallons an hour. Tubing saw slight pressure increase since it was bled down during the night. Possible Holefinder Equalzing dart offset and allowed pressure in from below. Continue standby for production to manipulate pressures. Tubing will hold pressure - while IA take 16 gallons a min rate. Stop pumping and start equalizing DD Holefinder to pull. Tubing on Vaccum standby for Vaccum to Disapate. POOH. OOH/w Tools. Rig down Prep to Leave Platform. Tubing will hold pressure - while IA take 16 gallons a min rate. MITIA failed the pressure test, so this well has not met the requirements for conversion to an injector. It remains classified as a Development well and injection is not allowed. BJM. 1 Winston, Hugh E (CED) From:Katherine O'connor <Katherine.Oconnor@hilcorp.com> Sent:Monday, November 8, 2021 2:11 PM To:McLellan, Bryan J (CED) Cc:Juanita Lovett Subject:FW: [EXTERNAL] GPS 22-13RD3 (PTD 217-086) Conversion to Injector The MITIA did fail, and the well is currently shut in. There are currently no plans to put the well on injection (because of the failed test), hence no injection check valve test. Thanks Katherine Katherine O’Connor CIO Operations Engineer Katherine.oconnor@hilcorp.com W: (907) 777‐8376 C: (214) 684‐7400 From: McLellan, Bryan J (CED) <bryan.mclellan@alaska.gov> Sent: Monday, November 8, 2021 1:03 PM To: Katherine O'connor <Katherine.Oconnor@hilcorp.com> Subject: [EXTERNAL] GPS 22‐13RD3 (PTD 217‐086) Conversion to Injector Katherine, I’m reviewing the 10‐404 for Sundry 321‐229 and from what I can tell, it looks like the MITIA failed and there is no mention of testing the check valve. Were these tests completed successfully? Is the well currently injecting? Thanks Bryan McLellan Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission 333 W 7th Ave Anchorage, AK 99501 Bryan.mclellan@alaska.gov +1 (907) 250‐9193 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing 2.Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3.Address: 3800 Centerpoint Drive, Suite 1400 Stratigraphic Service 6.API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9.Property Designation (Lease Number):10.Field/Pool(s): Granite Point Field / Middle Kenai Oil Pool 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 12,956'N/A Casing Collapse Conductor Conductor Surface 1,540 psi Production 3,090 psi Liner 7,020 psi Liner 13,830 psi Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16.Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email:wrivard@hilcorp.com Contact Phone: (907) 777-8847 Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Other: Convert to Injector N/A 10,746' 11,670' 10,312' ~1424psi 5,621' 5" 8,151'7" 11,800' 10,376' Authorized Title: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. 5/18/2021 2-7/8" & 2-3/8" Stan Golis for Daniel E. Marlowe DHL Hyd Ret Pkr & TRSV-NE 8,495' Perforation Depth MD (ft): 6,643' 10,555 - 11,560 2,135' 10,312' (MD) 9,610' (TVD) & 359' (MD) 359' (TVD) Tubing Grade:Tubing MD (ft): 9,800 - 10,261 Perforation Depth TVD (ft): 294' 26" 18" 13-3/8" 600' 9-5/8"6,643' 3,989' 599' 3,973' 6,616' 600' 3,989' 294' 6.5 / L-80 & 4.7 / L-80 TVD Burst 10,501' 8,160 psi 9,910 psi Tubing Size: MD 3,090 psi 217-086 50-733-20095-03-00Anchorage, AK 99503 Hilcorp Alaska, LLC Granite Pt St 22-13RD3 COMMISSION USE ONLY Authorized Name: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0018761 Authorized Signature: Operations Manager Wyatt Rivard PRESENT WELL CONDITION SUMMARY Length Size 5,750 psi N/A 294' Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Meredith Guhl at 7:14 am, May 05, 2021 321-229 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.05.04 16:33:02 -08'00' Stan Golis (880) SFD 5/7/2021 DSR-5/5/21 X 10-406 10-413 10-404 BJM 5/14/21 SFD 5/13/2021 Variance to 20AAC25.265(b) granted conditionally under 20AAC25.265(o) for alternative safety system arrangement. Conditions of variance approval: Perform Pressure test of check valve every 2 years. See test requirements in attached procedure. bjm Variance to 20AAC25.412(b) granted (packer depth 243' above perfs) MITIA to 2500 psi. Check valve must be installed directly adjacent to the wing valve on the tree. dts 5/20/2021 JLC 5/21/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.05.21 10:04:58 -08'00' RBDMS HEW 6/2/2021 WINJ Conversion Well: GP 22-13RD3 PTD: 217-086 API: 50-733-20095-03-00 Well Name:GP 22-13RD3 API Number:50-733-20095-03-00 Current Status:Active Producer Rig:SL + Ops Estimated Start Date:May 18, 2021 Estimated Duration:5 Reg.Approval Req’std? Date Reg. Approval Rec’vd: Regulatory Contact:Juanita Lovett 777-8332 Permit to Drill Number:217-086 First Call Engineer:Wyatt Rivard (907) 777-8847 (O) (509) 670-8001 (M) Second Call Engineer:Katherine O’Connor (907) 777-8376 (O) (214) 684-7400 (M) AFE:215-01461 Current BHP:2413 psi @ 9896’ TVDss (Based on downhole gauge on 5/2/21) Max Expected BHP:2413 psi @ 9896’ TVDss (Based on downhole gauge on 5/2/21) Max Potential Surface Pressure:~1424psi (Based on .1psi/ft gas gradient) Recent Shut In WHP:~58psi (Taken 4/30/21) Min ID:1.875” ID X Nipple @ 10,331’ MD Brief Well Summary: GP 22-13 RD3 is a C-6 producer sidetracked in September 2017 from GP 22-13 RD2, a shut-in injector. The well is very low rate and has remained largely SI since completion. This project will convert the well’s service back to water injection. Objective: Convert the well service to water injection. Notes Regarding Wellbore Condition: - Passing MIT-IA to 2000 psi on the rig on 9/20/2017. - Well had a passing no-flow test on 10/8/2019 Variance Requested: 20AAC25.412(b) Packer will be set greater than 200ft measured depth from open perfs. Tubing packer is at 10,312’MD which is 243’ MD above the uppermost open perforations at 10,555’. 20 AAC 25.265 (o) Hilcorp is requesting a variance to install a check valve adjacent to the tree as an alternative to an automated surface safety valve due to this well’s injection being incapable of sustained back flow. A check valve would be installed adjacent to the well tree to prevent any possible backflow to surface as good engineering practice and common practice for Cook Inlet water injection wells. During waterflood operations, the well will have a full fluid column of water equivalent to 4255 psi. The current shut-in BHP is 2413 psi indicating well will be on a vacuum until liquid level stabilizes. Additionally, on 10/8/2019 the well had a passing AOGCC witness no-flow test. As with recently converted injector, GP 24-13 RD2, the check valve would be function/pressure tested upon initial injection and once again every 4 years. Area of Review – GP 22-13RD3 (PTD#217086) Prior to the conversion of well GP 22-13RD3 from producer to water injector, an Area of Review (AOR) must be conducted. This AOR found three other wells (GP 32-13 RD, GP 32-13 and GP 33-13) within ¼ mile of GP 22-13RD3’s entry point into the Lower Tyonek Sands. See attached table Area of Review GP-22-13RD3 for annulus integrity and zonal isolation of all wells within the AOR. Snapshots of available CBLs for wells within the AOR are also attached. There are no pool boundaries between perf interval and packer. Variance granted. - bjm Variance requset to 20 AAC 25.265(b) the check valve would be function/pressure tested upon initial injection and once again every 4 years. Test check valve every 2 years. See test procedure in step 5.d.i. - bjm WINJ Conversion Well: GP 22-13RD3 PTD: 217-086 API: 50-733-20095-03-00 Pre Sundry Work: Slickline 1. Rig-up Slickline and pressure test lubricator to 250psi low/ 2,500psi high. 2. RIH and replace all live gas lift valves to dummy valves. a. Fluid pack IA with filtered seawater or produced water through station at 10,213’ MD prior to setting final DMY valve at 10,213’ MD to ensure IA fluid packed. b. Pressure test IA to ~1500 psi to confirm IA fluid packed and GLVs set. 3. RD Slickline Sundry Procedure (Approval Required to Proceed): Operations 1. Notify AOGCC for witness of Pre-Injection MITIA to 2,500 psi. a. Test Pressure = .25psi/ft*9610 ft (Packer TVD) = 2403 psi b. Record 30 minute test and complete AOGCC 10-426 MIT Form c. Submit completed form to Julie Wellman at Julie.Wellman@hilcorp.com for ultimate submission to AOGCC 2. Initiate injection. 3. Notify AOGCC for test of injection check valve and initial, injecting, MIT-IA within 2 weeks of stabilized injection 4. Complete injecting MIT-IA to 2,500 psi a. Record 30-minute test and complete AOGCC 10-426 MIT Form b. Submit completed form to Julie Wellman at Julie.Wellman@hilcorp.com for ultimate submission to AOGCC 5. Complete injection check valve test. a. Record stabilized injection rate and pressures b. SI the well and monitor injection pressure via SCADA or chart c. Block and bleed down injection pressure upstream of the check valve. d. Monitor for any flow e. Record results and submit on AOGCC SVS Test Form (SVS test only, Pilot & SSSV “NA”) Attachments: - As Built Schematic - Proposed Schematic -AOR Table - AOR Map -AOR CBLs . With master valve closed, pump-in through Swab valve to pressure test check valve. 5.d.i. Monitor pressure inside tree. Pressure inside tree to remain above 2500 psi during test. Test duration 5 minutes. Notify AOGCC for test of injection check valve and initial, injecting, MIT-IA within 2 weeks o Chart or record pressure data on 1 minute intervals. Notify AOGCC to witness test. - BJM Lube and bleed is acceptable method to fluid pack IA if DGLVs are already set. Verbal permission granted to commence SL GLV work prior to Sundry approval. - bjm Updated By: JLL 10/19/17 SCHEMATIC Granite Point Platform Well: Granite Pt St 22-13RD3 Last Completed: 09/22/17 PTD: 217-086 API: 50-733-20095-03 PBTD: 11,670’ TD: 12,956’ 2 26” 5” MAX HOLE ANGLE = 67.84ȗ @ 11,002’ C-6 TOC @ 8,770’ 6 7 8 13-3/8” 9-5/8” 1 5 TOC @ 8,362’ 18” 7” 4 3TOC @ 5,864’ X KB = 42.3’ or 115’ RKB from MSL CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515” Surf 3,989' 9-5/8" 40 N-80 BTC 8.835” Surf 6,409’ 43.5 N-80 BTC 8.755” 6,409’ 6,643’ TOW 7" 29 L-80 BTC 6.184” 6,360' 8,495’ (TOW) 5” 23.2 L-80 Hydril 513 4.044” 6,179’ 11,800’ TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441” Surf 6,112’ 2-3/8" 4.7 L-80 8rnd EUE 1.995” 6,112’ 10,501’ PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Comment C-6 10,555’ 11,560’ 9,800’ 10,261’ 1,005’ 09/22/17 Open 3-1/8” 6 spf JEWELRY DETAIL No Depth (MD) Depth (TVD)ID OD Item 49’ 49’ Tubing Hanger 1 359’ 359’ 2.313 4.910 SCSSV – Halliburton TRSV-NE 2 2,494’ 2,485’ 2.441 4.750 GLM #1 PSPO-1M Mandrels, R-1 Valves w/ BK-2 latches 4,327’ 4,310’ 2.441 4.750 GLM #2 PSPO-1M Mandrels, R-1 Valves w/ BK-2 latches 5,717’ 5,697’ 2.441 4.750 GLM #3 PSPO-1M Mandrels, R-1 Valves w/ BK-2 latches 3 6,112’ 6,089’ 1.995 3.700 Crossover 2-3/8 EUE 8rd x 2-7/8 EUE 8rd 4 6,739’ 6,711’ 1.995 3.330 GLM #4 GLMAX-1HP Mandrels, R-1 valves w/ T-1 latches 7,473’ 7,403’ 1.995 3.330 GLM #5 GLMAX-1HP Mandrels, R-1 valves w/ T-1 latches 8,240’ 7,996’ 1.995 3.330 GLM #6 GLMAX-1HP Mandrels, R-1 valves w/ T-1 latches 9,006’ 8,503’ 1.995 3.330 GLM #7 GLMAX-1HP Mandrels, R-1 valves w/ T-1 latches 9,609’ 9,013’ 1.995 3.330 GLM #8 GLMAX-1HP Mandrels, R-1 valves w/ T-1 latches 10,213’ 9,527’ 1.995 3.330 GLM #9 GLMAX-1HP Mandrels, RO01 orifice w/ T-1 latches 5 10,262’ 9,569’ 1.975 3.669 Halliburton ROC Gauge Mandrel w/ 0.25” TEC wire 10,271’ 9,576’ 1.970 3.210 RA Marker Sub 6 10,312’ 9,610’ 1.925 3.750 4-1/2” DHL Hydraulic Retrievable Packer 7 10,331’ 9,626’ 1.875 2.730 X Nipple 10,501’ 9,760’ 1.935 3.155 Ported Sub 10,541’ 9,790’ N/A 3.125 Mechanical Firing Head 8 10,556’ 9,801’ N/A 3.125 TCP Assembly (3-1/8 6 SPF RDX Super DPTCP Guns) 11,562’ 10,262’ N/A 3.125 Lower Firing Adapter 11,563’ 10,262’ N/A 3.125 Absolute Pressure / Time delay Firing Head Updated By: JLL 05/04/21 PROPOSED Granite Point Platform Well: Granite Pt St 22-13RD3 Last Completed: 09/22/17 PTD: 217-086 API: 50-733-20095-03 PBTD: 11,670’ TD: 12,956’ 2 26” 5” MAX HOLE ANGLE = 67.84ȗ @ 11,002’ C-6 TOC @ 8,770’ 6 7 8 13-3/8” 9-5/8” 1 5 TOC @ 8,362’ 18” 7” 4 3TOC @ 5,864’ X KB = 42.3’ or 115’ RKB from MSL CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515” Surf 3,989' 9-5/8" 40 N-80 BTC 8.835” Surf 6,409’ 43.5 N-80 BTC 8.755” 6,409’ 6,643’ TOW 7" 29 L-80 BTC 6.184” 6,360' 8,495’ (TOW) 5” 23.2 L-80 Hydril 513 4.044” 6,179’ 11,800’ TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441” Surf 6,112’ 2-3/8" 4.7 L-80 8rnd EUE 1.995” 6,112’ 10,501’ PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD)FT Date Status Comment C-6 10,555’ 11,560’ 9,800’ 10,261’ 1,005’ 09/22/17 Open 3-1/8” 6 spf JEWELRY DETAIL No Depth (MD) Depth (TVD)ID OD Item 49’ 49’ Tubing Hanger 1 359’ 359’ 2.313 4.910 SCSSV – Halliburton TRSV-NE 2 2,494’ 2,485’ 2.441 4.750 GLM #1 PSPO-1M Mandrels, R-1 – (Dummy Valve) 4,327’ 4,310’ 2.441 4.750 GLM #2 PSPO-1M Mandrels, R-1 – (Dummy Valve) 5,717’ 5,697’ 2.441 4.750 GLM #3 PSPO-1M Mandrels, R-1 – (Dummy Valve) 3 6,112’ 6,089’ 1.995 3.700 Crossover 2-3/8 EUE 8rd x 2-7/8 EUE 8rd 4 6,739’ 6,711’ 1.995 3.330 GLM #4 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 7,473’ 7,403’ 1.995 3.330 GLM #5 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 8,240’ 7,996’ 1.995 3.330 GLM #6 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 9,006’ 8,503’ 1.995 3.330 GLM #7 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 9,609’ 9,013’ 1.995 3.330 GLM #8 GLMAX-1HP Mandrels, R-1 – (Dummy Valve) 10,213’ 9,527’ 1.995 3.330 GLM #9 GLMAX-1HP Mandrels, RO01 – (Dummy Valve) 5 10,262’ 9,569’ 1.975 3.669 Halliburton ROC Gauge Mandrel w/ 0.25” TEC wire 10,271’ 9,576’ 1.970 3.210 RA Marker Sub 6 10,312’ 9,610’ 1.925 3.750 4-1/2” DHL Hydraulic Retrievable Packer 7 10,331’ 9,626’ 1.875 2.730 X Nipple 10,501’ 9,760’ 1.935 3.155 Ported Sub 10,541’ 9,790’ N/A 3.125 Mechanical Firing Head 8 10,556’ 9,801’ N/A 3.125 TCP Assembly (3-1/8 6 SPF RDX Super DPTCP Guns) 11,562’ 10,262’ N/A 3.125 Lower Firing Adapter 11,563’ 10,262’ N/A 3.125 Absolute Pressure / Time delay Firing Head PTD API WELL STATUS Distance Top of LowerTyonek C SandsTop of Cement Annulus Integrity Zonal Isolation2170860 50733200950300 GP22-13RD3 ActiveProducerin C60' 9720' MD(8978' TVD)8770' MD (8324'TVD)MIT-T to 2500 psi and MIT-IApassed to 2000 psi on 9/20/14 onrig.5" Production liner cemented in place inside 6" hole with 55 bbls15.3 ppg Easyblock cement. Good returns and bumped plug. 9-19-2017 CBL showed top of cement at ~8770' MD.2170860(PB-1)50733200950300(Plug Back-1)GP22-13RD3(PB-1)P&A 0' 9720' MD(8978' TVD)8770' MD (8324'TVD)P&A'd, pumped total of 31.8 bblsof 16.5 ppg class G cement upthrough PB-2 and across/above PB-1 plugbacks. TOC found at 9928'MD before final RD3drilling/completion.Majority of PB-1 6" borehole used in final RD-3 drilling/completion(casing & cement data above). Small portion of PB-1 boreholewhich is below current RD3 KOP of 10100' MD was left as open holesidetrack but was isolated during PB-2 plugback and is entirelywithin C-6/C-7.2170860(PB-2)50733200950300(Plug Back-2)GP22-13RD3(PB-2)P&A 0' 9720' MD(8978' TVD)8770' MD (8324'TVD)P&A'd, pumped total of 31.8 bblsof 16.5 ppg class G cement upthrough PB-2 and across/above PB-1 plugbacks. TOC found at 9928'MD before final RD3drilling/completion.PB-2 was sidetracked off of the PB-1 borehole at 10810' MD. PB-2sidetrack was P&A'd and is entirely within the C-7.1920200 50733200140200 GP 32-13 RD ActiveProducer inC5245 9391' MD(9000' TVD)8188' MD (est.)(8005' TVD)MIT-IA to 1500 psi passed on rigon 5/17/927" Liner cemented with 253 bbls (1225 sx) of 15.8 ppg class G in8.5" hole. Pressure packed off and 38 bbls cement reversed back tosurface. Drilled out an additional 97 bbls worth of cement leaving118 bbls behind liner bringing estimated TOC up to liner top at8188' MD. CBL run on 5-11-92 but tools failed above 10240' andTOC not logged.1720210 50733200140100 GP 32-13 P&A 320 9195' MD(8882' TVD)8940' MD (8736'TVD)P&A'd. Reservoir abandonmentplug pumped with 300sx class Gthrough retainer at 8585'. Wellsidetracked as GP 32-13 RD7" liner cemented with 475 sx of class G. Plug bumped at 2250 psi.CBL run 10-4-72 showed top of cement at ~8940' MD.1670180 50733200140000 GP 33-13 P&A 841 9418' MD(9081' TVD)8927' MD(8702' TVD)P&A'd. Reservoir abandonmentplug pumped with 50 sx class G upto 8834' MD. Well sidetracked asGP 32-137" Liner cemented with 700 sx Class G in 8-1/2" hole. CBL run 7-2-67 showed cement to top of liner at ~8927' MD.8.5GP22-13 RD3 Area Of Review PTD API WELL STATUS Distance Top of LowerTyonek C SandsTop of Cement Annulus Integrity Zonal Isolation2170860 50733200950300 GP22-13RD3 ActiveProducer inC60'9720' MD(8978' TVD)8770' MD (8324'TVD)MIT-T to 2500 psi and MIT-IApassed to 2000 psi on 9/20/14 onrig.5" Production liner cemented in place inside 6" hole with 55 bbls15.3 ppg Easyblock cement. Good returns and bumped plug. 9-19-2017 CBL showed top of cement at ~8770' MD.1920200 50733200140200 GP 32-13 RD ActiveProducer inC5245 9391' MD(9000' TVD)8188' MD (est.)(8005' TVD)MIT-IA to 1500 psi passed on rig on5/17/927" Liner cemented with 253 bbls (1225 sx) of 15.8 ppg class G in 8.5"hole. Pressure packed off and 38 bbls cement reversed back tosurface. Drilled out an additional 97 bbls worth of cement leaving118 bbls behind liner bringing estimated TOC up to liner top at 8188'MD. CBL run on 5-11-92 but tools failed above and 10240' and TOCnot logged.1720210 50733200140100 GP 32-13 P&A 320 9195' MD(8882' TVD)8940' MD (8736'TVD)P&A'd. Reservoir abandonmentplug pumped with 300sx class Gthrough retainer at 8585'. Wellsidetracked as GP 32-13 RD7" liner cemented with 475 ks of class G. Plug bumped at 2250 psi.CBL run 10-4-72 showed top of cement at ~8940' MD.1670180 50733200140000 GP 33-13 P&A 841 9418' MD(9081' TVD)8927' MD(8702' TVD)P&A'd. Reservoir abandonmentplug pumped with 50 sx class G upto 8834' MD. Well sidetracked asGP 32-137" Liner cemented with 700 saks Class G in 8-1/2" hole. CBL run 7-2-67 showed cement to top of liner at ~8927' MD.GP22-13 RD3 Area Of ReviewSUPERSEDED WINJ Conversion Well: GP 22-13RD3 PTD: 217-086 API: 50-733-20095-03-00 GP 22-13RD3 CBL WINJ Conversion Well: GP 22-13RD3 PTD: 217-086 API: 50-733-20095-03-00 GP32-13 CBL WINJ Conversion Well: GP 22-13RD3 PTD: 217-086 API: 50-733-20095-03-00 GP 33-13 CBL e 0 0 N o c co N o CD co. 0 co N N T O r. • J 0 y N Z .m co E 07 U j N a d• _ w d co 4.= r CO d 2 F- t _� cn 2 F- 2 F- 2 F- ❑ ❑ CNJ I= '�" ❑ c9 I- ❑ 0 0000000. I- F- ,- , CD CO o O O a) O co co co co co co co co co M M N N a) co in 7 z Z E ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ N N E 0 co CC cC cr cC CC CC CC CC CC CC CC F- F- m IX F- 1 0) N co M co co co co co co co co M (q 0) co C W N N N N N N N N N N N d d LL N N p - N N N N N N N N N N N .. N a� a a a a d d 0 d O d OLu W a m a J c O0) O 0 0 C9 C7 U 0 0 CJ C� CJ C.9 C C.9 0 o_ c m (I) (I) ai ai ai ai ai ai ai ai Q Q co U ro o Q) 0 c 5 LL 0 c a 2 -.LL. LL. w LL LL LL LL LL LL LL ❑ F- LL, w z d c U 'c c c c 'c c 'E0 0 0 c O O c ❑ E a co co 0 2F- 0 0 0 o 5 0 0 0 0 0 0 0 091--12wp o _1 o N o ❑ t t t L o o o C o o o o Q 2 Q t v Z U aU t ) a ) a ) a) = a) > a) a) a) a) a) a) a) w .-w o m o D E w� w w wcn W0) w w w w w w w c" 2 c = wa wcn O 0 Y 7 c r, r•- ,- r` r` r` r` r-- .- ` r-- .- CL �, co � 0 00 0 0000000 0 0 7 N N N N N N N N N N N N N N W J a) O) C) C) a) C) C) C) C) m CT m Q co .- a/ 0 6 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 c W o O -.I 2 U o 0 0 Z o a) 7 ) ToN J o. ca aa)))) e 0 N pa) G. r- • c Zl c to 0 • 2C r-k 0o N CU � v O t N * a a� ~y a) y 0eo UN 06. ti.... E E N U (0 C, o J '_ O O M J �. Z W COcl co co 0 caCA:13 c 0) O m 173 5 N p J =. G F- N y N 7 a)l0 0. CtiM W w .,(Ir V/ Z p �.. F Q 0 U O 0 CC 4(i.) ❑ 1 Zo E ap m co c m m m ca m m m ca m ca m m a� 4-) m ca a) coco co CO CO (6 a CO m m ca CO ca m a -p CO is . E E 0 0 ❑ 0 0 ❑ 0 0 0 0 ❑ ❑ ami ami 0 0 7 m m m m m ca a C0 m ca m S I m m o CL Z N _m m _m m _m _m m m _m 5 _m O� >_T 0 Zco ❑ ❑ ❑ i5 ❑ ❑ ❑ ❑ ❑ ❑ ❑ J J ❑ ❑ > 0 J .0 ) - - •C' V 7 ' V .- V V V V - V Lo Lo u7 F - CO co c0 co co CO M M Co CO CO M c0 (fl CO CO C) F- a) c.. E (o CO CO CO CO 0 CO CO (O CO CO CO (O 0 M Co Q z r C _ CO 7 a0 CO CU 00 CO CO 00 CO CO CO CO Co CO CO CO W O 0 W O z N N N N N N N N N N N N N N N N N .. 0 1Q O E E 6 L ZI re o Fi O 0) 0 O 15 c �a o CVW a ID a) re_ zW o 2 0 0 0 U 0 0 0 0 0 0 0 0 0 0 0 0 m cc Q E • a a a a)=° a 0 0 0 0 0 ❑ ❑ o ❑ ❑ 0 ❑ 0 0 0 0 a G I- 5. -IoI w w w w w LU w w w W LU w J J w w or • C • • r • • • 0 N a) o) E 4- E -a 0 v a w. M a) m m 4-, cV , • U a) a :_. O N C) o :2 0 a> a ❑ ❑ ❑ 6 ❑ .�2 .2 0 a) a w ❑ ❑ ❑ ❑ J o Z c ❑ ❑ ❑ ❑ > > > > - E E ❑ ❑ ❑ ❑ > > > > N CO a N P ui 2 2 2 2 H H H H '� '. v_i 2 2 2 2 H H H H a OJ Co U ❑ 0 C..) (..) 0 U U CJ U U N 0 0 U` 0 U U U U U U U c`') co y r � F- H H H H H H H N H H H H H H F- H ❑ ❑ 0 • 0' a N N N N N N N N N N N a' >:. m m m o m m CU Cb Cb Co (� CO m CO CO CO CO CO CO Co CO CO M cocoa a a a a a a a a a a a a a a a a a a a a -o C co co co co CO CO CO CO CO CO N c`') co CO CO CO CO CO CO CO CO CO N N 7 Z 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ E 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ CV CV .= E- F. M co co CO CO CO CO CO CO CO a) co co co co co M co M co co co (/) C/) Q N (V N N N N N N N N a 2 N N N N N N N N N N N d d N N N N N N N N N N N N N N N N N N N N N a a a a a a a a a a a) m a a a a a a a a a a a w w 1- 6a aZ ZLi Ua ) aaaaaaa) aa W a it a a it it W LL it ❑ H a a it LL a a a a a a a r= (n cC 0 (n N U y U U U U U U U U U U ❑ U a U 7 U U U U U U U U U m 'o o 'c o 'o 'c c 'c 'c o o c O- 'o c 'c 'c c 'c 'c 'c o 'c o w o co 0 > 0 0 0 0 0 0 0 0 0 0 _1 o > o > 0 0 0 0 0 0 0 0 0 ( 00 CO CI (/) 0 L 0 0 0 0 0 0 0 0 0 ON o Z o L 0 0 0 0 0 0 0 0 0 CC < CC < _I J a) = a) a) a) a) a) a) a) a) a) a) m a) = CU 0 a) a) a) Cl) a) N a) a) U) .— W — w I/ J „C W CO LU W W W W W W LU W W a W (f) W U) W LU LU W W W W W W N 2 N 2 0 Y 3 r r r N- r r r N- r N- N- . N- ,- h- ,— r r r r r r r r r CL �, U0 000000000 000000000 Q N N N N N N N N N N N N N N N N N N N N N N W aJ O) ) O) 0 O O) 0 0 O) O) O 0) 0) O) O) a) O) 0) 0) a) O) a/ a o o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W o ”— s "J.. U J J_ _ 0 Z QM l`6 n N O O y 3 J a co 0 O. N c O G O o 0 G 0 co O 'EON Z.0 0 N 0 JT N O ICC L Q U C: O- F.' W G M C4 N- 5 N E N~ N N W to N H (T WI— O. w a) CO Q a Q 0 o U a) < o n 0 z d 0 0 u) n E (0O m co 0 0 Z (/) C/) m m m CO CO CO m CO m CO CO CO CO CO m CO m m m m m CO ',-.) a) CO CO CO m CO CO CO m Co CO CO CO co co co CO 03 m CO m CO CO iO -0 -0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ami ami o m m m m m CO m m m m CO m m m m m m m m m m 2 I ❑ ❑ 0000000000 ❑ ❑ 000000000 J J (0 > to CC) LC) Cf) LC) LC) LO LC) LC) CC) CO CO CO CC) CO CC) CO (O CO CO CO (D CO N 1 CO CO (O CO CO CO CO CO CO CO CO CO CO CO (O CO CO CO (D CO (D CO (O CO O ~' CO CD (D (fl (0 CO (O CO CO (O CO CD CO CO CO CO CO CD CD CO CD (O CO 1.-- N. Co Co Co 00 00 Co CO Co CO Co CO CO CO CO 00 Co 00 Co CO co CO CO CO CO e- N N N N N N N N N N N N N N N N N N N N N N N N N co 0` O N 0 0000000000 0 U 0000000000 0 X. ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ ❑ 0 0 ❑ ❑ ❑ 0 ❑ 0 0 a 2 w LU W LU LU LU w LU w LU w LU w LU W W LU W W W W LU J J r • o 0 0 M u) N O fa CO 1111. W CO 00 00 1111 % 08 r r V V aa aa CL a) a) a) a) a) a a a a' a a' a' CC 2' a: a a' a' a' a' M U N0) 0) 0) 0) 0) 0) 0) 0) Cr) 0) 0) C) 0) 0) 0) 8 co N C C C C C C C C C C C C C C C r 5 C C C C C C .` .0 C C C C C C C o 0). d O O O O O O O O O O O O O O O T o J C7 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 b O 1 co co co co co M co co co co co co co co co F. 6 0 O E ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ Z co -1 corn Co a a a a a a a a a a a re re a a g F. --1 C 2 J J c M M _M co_ _M co M co co co co co co co co QO T E C CLL N N N N N N N N N N N N N N N . ❑ O O 0 ., N N N N N N N N N N N N N N N w U 0 m a) ( C0( - n O 0 0 0 0 0 U 0 0 0 C7 (0 0 0 Q o �'=co 0 oC�❑ w ai a; a; a; 6 a; N � € €JLLLL CO J ❑❑❑❑❑ in It it it it it Il it it it it it it it, it it In -0>> >>> 0w ow 0w 0w o 0w c.)4.- C.)4- C.)4- c.)»- 4.- 4- Ur- 0w > C 'C 1:3 'C 'CI 'C 'C 'C 1:3 c v 'C 13 'C 13 'c v 'C v 'C 13 'c 13 'c a 'C v 'c 1 gCtCCt o oa o4. 04 04 04 04 oa oc- 04 oa (Dia oa oa oa 0a ;� 0 0 0 0 r n n n r n r- N n N- N- N- N- N- J C.' _ _ _ a) a)' a)n a)W a) N O a)_ a)N N A N (Dui a)c6 a)n a)cO a) N O ceJ LL N&N N M W W W W W W N W N W N W N W N W N W N W N W N W N W M O • n r r n r n n n r- .- r n r- 5) n n n r r 0- �, U o 0 0 0 o s s o s o 0 0 0 0 O IN N N N N N N N N N N N N N N N N W 0) co 0, rn a) a) co co co rn rn iii rn co 63a co \ r r r r r r r r r r r r r r Ce �'. a I O O O a O O O O. O O O O O O O O O Ce r r r r r r r- r r r r r r W C J C.) z a Z r n o co co L. cn yco j ,- N J o co c sr r 0 Cn V V Z co O aD a E I o V N 0 U . JM Q co O bq tC 0. coCC P r N O 2 S N N ~ N co CO N d Lo °) N M w a) o Qgc o I—. a) ! ill Q c a CII m U II E co Z CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO d m iv CO CO CO CO CO CO CO CO CO CO CO CO CO CO m .1. oco ❑ ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o J CO CO co Co co co co a5a) co co co co co co CO o ❑ !2 ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ up > N N N N N N N N N N N N N N N N N CO o ~ h r h h N- h h r I-- r h r h h h N `17.- r. N co co co co co co co co CO CO CO CO CO CO 00 CO CO r !N N N N N N N N N N N N N N N N N N I O N U w U U U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C7 o d 0 o❑ 0 ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d a 2 -J LU LU LU LU w w w w w w w w w w w w • • o O 0 M N i1 r r r r r r r r r r r r r (-1 0) O O O O O O O O O O O O O co Z o N O) N O) N N O) O) O) N o cv A U_ rn CD CA a) a) a) a) a) o) rn rn CD CD ri X 8 M c c c c c c c c c c c c c m 0 Pr ❑ 'C 'C 'C 'C 'C 'C 'C 'C 'CC 'C 'C '>_ 0 A cz o o 0 0 0 0 0 0 0 0 0 0 0 0 J Jx a T 2 2 2 2 2 2 2 2 2 2 2 -oo x O O V b co co co co co co co co co co co co co 'O E 1 V co (/) . Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t ❑• v E• ❑1 ❑1 ❑1 W CC FY C4 C4 C4 C4 ce ce r ce it W Et -O ce -`o v a' ct E E r r r r r r r r r r r r co r r r r r a 1 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 'a a a a a a a a a a a a a a Q a a n a a a • C9 0 C9 C9 0 0 0 C9 0 C9 0 C9 C9 C9 rn C9 rn co C9 C9 0 . o ai hi ai ai ai ai ai ai hi ai 6 6 6 ai 6 hi 6 ai 6 ai • 'lL I.L I1 I.L it I.L 67 Il it Il ll Il it E m E Il it it it lL i'I 0...... U U r- 04- u..- U U U U U U U U U U U U U U U U ' E E E E E3Oa c Oa O0- Ca CO C O C O C C aC C E E O O O OO O O O O Om a nO Oa Oa a Oa a On a a t, N'r NnNN`- NN.- NrN UU.- U ` U.- U.- U.- 0 0 0 0 0 0 0 0 .- N.- N,- 0.- N 0e- 00000000 ce J 1g W c') W.- W(i2 W .- W.- W N W r) W a Win ED 6 W N W ao W o) W W W W W W W LU O 1 = r w N- r- N- N- r- N- N- N- n n N- n n r` r` N- r n r- A y 0 o O o 0 o O o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 li N N N N N N N N N N N N N NNNNNNNN W < cn m cn . CD CD m CD CD CD cn cn co cn a) m a) a) cn a) a) a a/ a Et o o ' 0 0 l. 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 W 0 -J U • o Z a ea w m o O °. AJA @ , li P.- O U Cc G N Oco 0 N V0 N 0 o J Q o co m H rr M ., r- N E F" N COI- CI. � N N WN H W a IU a, o Q • 11 1 Q o2. ' C.1 Z £ U as Z m m m m m c0 m m m CO CO m CO m CO CO CO CO CO CO CO ' (0 CO CO N co co l0 co co co co co co tas m m m m CO CO CO 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 m m m m m m m m m as m as m as m as as as as as as ❑ ❑ 0 0 0 0 0 0 ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 (O > N N N N N N N N N N N N N N N N N N N N N 00 0 H r ` N- ' N- 7. N- N N- N- n R. N- r n r r N- n N- r` N. Co CO CO CO CO Co CO co co co co co co co co Co ao co co co co r N N N N N N N N N N N N N NNNNNNNN N c• c o N :. iU 0 0 0 0 0 0 0 0 0 0 0 0 U U U U U U U U U C7 O E 0 IO 0 0 0 0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ d 0. M 1W W W W W W W W W W W W W LU LU LU W LU LU LU W • • o 9 4 I • • o M V N O) 01 O) O) 8) 00 O O J J J J C C o N o o i a E E to cu , • O O N �O EO co Co 00 N = = o o rn m U U E E co M V a� a> u a c c E E w co 0 0 ci c c 8 Co = V c iA in 0 0 u ri 0 (f) _1 _ in in O 0 li Q o la 'O ii it co co Co co co co Co . Co co Co 'O Z 01 co co 0 0 0 0 0 0 0 0 co co Co Co Co 0 cea re a ce Ce 0 0 0 0 0 I I I I I I I I I ce ce CC W a N N N N N N N N N N N N N N - N N.. N N N N N N N N N N N N V- N N N I I I I I I I N N N;, N N a s a a a a,- 0--10a a a a a a a a aO a 0 a o 0 0 0 0 0 0$ C7 o 0 0 0 0 0 0 C7 C7 C0 g 0 1 0 .0 .0 6 6 6ai a ai ai ai ai ai ai ai ai ai ai O) ai rn ai HIl LE U It ii it 2 it it it it it it..- l -a it ii it.J it J it� L4 N U U 0 U-p U a U U coU) U co U U U U U U • U y-, U ""w U CO U CO U E or 2 20 2> B E 2 E 2 Et 2 oa o0 2> 20 2> B E 2 E 2 C) I a) aa) m aa) m aa) o aa) o aa) j, aa) >, aa)0 aa)> aU)0 a)4 ti> aa)i o 4Ui o o o 4ti 'Ui o 4Ui j, aa) g, a>0 Ce J W LT Wa' L. WJ Wa WD W2 WI-- 12 tin— WJ WJ WJ WJ WD WO EM J y N. N. N. N- N. N. N. N. N. a �, 0 0 0 0 0 0 0 0 5 0 0 0 0 0 j N N N N N N -..0)N N N N N N N N N N N N 1 1 1 6� O� C� O� O� O� O_ O) a) O� O� O) O� O� O� O� O� a a a a a o a a a 4 o a a o a a a V JJ 2 O Z Q ro 3 o w CL r-- u N m a E o VN N U o J Q o reA.. M 5 N TO G H N COH N W N I.- O> p a W y CO I- N O Q g C o Q c a o D £ 0I, co 2 d co co co co CO CD Oi CO CO CO CO CO 03 CO CO CO CO CO co @ m CO co co CO CO m m CO CO CO CO CO CO CO o3 co •o• 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co > CV N N N N N N N N N N N N N N N N N o N. n n n rr; N- N- N- N- N- N- N- N F- co CO CO CO CO CO CO CO 00 CO CO CO CO CO 00 CO 00 CO N Z N N N N N N N N N N N N N N N N N N •` co a to O NU w 0 0 C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 P. O a 00 0 0 0 0 0 0 0 0 00 00 0 0 0 0 0 0 0 00 0 • 0 o o M N o m m m ♦ ♦ ♦ ♦ ♦ 5 ♦ . C C co co O o o O O r r) ol .M- co co • o O N 0) o j J J J .0 0 • 0) m a3 Co O Z O O O E E N N N N N NWi • C C E E a N f0 (0 0 0 N N N N N N C C = = O O E M o a) ct a. U U a,� a a aur a-p a V1 in in 0 0 LL LL M E 0 0 0 00 0 It) 0 w 0 a 0 7 0 0- C9 x N �. e n = O co co 0 q- 0 X Or- OrcNi -- 0o 0o a in O LL 0 U J J J J J O J O _1,-- _1‘.-O m m m m m m T M M M M M Co n Con Co 7 m' mp Cor' ' 6M M M co M M 0 0 0 0 0 0 Y Y Y O Y co o Y Y E 0 0 0 0 0 0 d M N N N N O O C ,_ M Q n < I,- <0 <0 <0 <0 N Q c i N N N Ne'm e'm EL e' E e- LL N w CV N _ N:t N N N N N N N 0* 0* 0* 0* 0 Nlc N • N N '•• N N J a a a a a -� - � - � - � — t = t io a0 a j a0 au a a O 0 0 0 0 2 0 2 0 2 0 Z o 2 0 2 0 0g 0 Om OF 0 0 O ai ai ai ai ai aim ai aai aim ai aai aim ui o -. ai o ai o hi o ai o hi hi LL LL - LL LL E..- LL ce LL W LL W LL W LL W LL W 0 LL J LL J E_1 E_1 LL LL w co 0 C) 0 0' 0 c.> 3 c03 03 c., 03 03 0 0c 0C o0 00 0w 0" 7 E E Ew E0 E0 oL oL oL of oL o2 o o) 'E2 0 0 o U o U E0 00 m _ .r g 0) o cn U) cn @ m m E E 1 N 86t'"-: td 0 0 C)M 0 M 0 M 0 M 0 M o M o - o f o f t2 t2 o o > m 0 o> o0 a� o a�0 o0 o0 o0 o0 00 o m 08 08 o , o , 2 0 o o J C WF ED:E WH di-J GJ-J Woc Woc Wa' D3 cc Woc Wa' ED a_ Wu_ Wu_ WD WD ED-J ED-J N O 7 '• ;n n n n n n n n n n N- a n n n n n N- ,- n Cl- �, 0 0 0 0 0 0 0 0 0 o s o 0 0 a • N N N N N N N N N N N N N N N N N N W m m - 6- m �/ d CC o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W Co J C.) • 0 Z t5 o QN cv d . J a @ , 0 Mrs C o N O 00 II E V N U o J Qo re a r M I— - n 5� N O G I- N0 N N CO a cn p W a) 01 a I— Q • 0. D Z EI U as Z I m a) co m co co as co co co co co co co co co co m • 0 co o co co co co co co co co m co co co co co co to N- o 0 0 0 0 0 0 0 0 0 0 0 0 q 0 0 0 0 0 - 10) 5 5 0 a o) 0 a• a a 0) a 5) .5 a a o) 0) O 0 1,0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co > 'N N N N N N N N N N N M_ R) M M M M M O O ~ n n n n n N- n n n n n n n n n n n n h Lco co co CO Co co co CO CO CO 'CO CO co co co co co Co ✓ N N N N N (Ni N N N N N N N N N N N N N G O m o N U �" C ' U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U7 F. Q a.• 2 W WW W W W W W WW W W W W WW W W W W W • • (h C c O) 0 O) C) ON _ _ J J J J O O ' 0 O O O O O CD O Ce co a' ' I co co I E E LL X O) Z co co .0 N O O a a m C E E a'co co0 0 li 0 M _V C c _ _ O O co co w x . . J J 8 n u) 0 LL IL J J I O (!� to Q a co n co coo E i io m m m m m m m m — m m -c m m mz IS o 0 0 o a a a a a a a a a a a a m m Cl_ a 4 Z W o W 0 0 0 0 0 0 0 0 0 0 0 a 0 a a 0 0 1i Q r r r r r co r`� r r r r r r r r co M co M '..I N N N ci N N N N-0 N O. N N N N N N N N :---1 N N a a a:- a a a CV a5 a a a a a a a n a a a a a O 0 0 O0 0> O 0 0 0 1,_ 0 0 0 0 0 0 0 rn O co co 0 0 ai ai ai 2 ai i_ ai ai w 6 o 6 o ai 6 ai ai ai ai ai 6 ai ai ai ai 6 LL it.••• it O) it rn it 4- it a it_1 it_1 it IL LL it Ili it a it it it it it it it co U w U":: 0 O 0 O U O. U 0 o o u) U U U U O a U • C) U U U U U U Ed E0 C J C J C C C c c c`, c -C`- c c 0 c c C C c C C :° o� o> 0 0 0 0 0� o> 2E o c o-0 o a o13 o a o, o� o 0 0 0 0 0 0 a .n V Cr) _N O _N O N t o N o _N _N N j, _N j, _N N _N N a td N N N N N N N N N IX J N W J W J W 0 W U W J W J W 0 W 0 W 2 W F W 2 W H W J W J W LU W LU W LU W 0 n n n r-- ‘-- n n n n N- ..- r-- 4- n N- N- N- N- n N- n n n n y 0 L.--• O o �O �O O O 0 0 0 0 0 0 0 0 0 0 0 0- Q N N N N N N N N N N N N N N N N N N N N N W < ) O) O)a 0) O0 0) 0) 0) 0) 0) 0) 0) O) O) 0) O) OO) O) O) O) o o o aa�a4a�o4a�o4o�a a a a a a o Lii Vq 'I z 0 Q43 J o ar,. co 2 g o ON n E 0 24 V N 0 o J n CI 0.0 ct I'''"' cc r n 5 N G N CV 0 /� y N WN 0) H a 76I 0 QCD co 4.4N Q O a z o co Z co co co m co co co co m co co co co co CO m CO m CO m CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003 co co co co m co co co co co co co co co m m co m m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co > ( co co ( ( co ( ( ( M (�') () () co (+) (+) M () M () () o ~ ICO CO CO r= CO CO CO 7- 7- CO CO CO n CO n n n n n n n N.. CO CO CO CO CO CO CO CO CO CO CO CO CO CO W W CO W CO W CO N N N N N N N N N N N N N N N N N N N N N N ai in co .0 C U U :, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (.77 if O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d LU LU LU LU W W W W LU W LU W W W LU W LU LU 111 LU LU • • o n o o N o (9 co CO CO O O o0 in 0 CD 0co O Z .F x d' •• •/ C C E £ 0 00 N co co d c c .- - O O m m > ? E co _0 'n E in 0 0 LL LL o o J J 6 M P P M o �I �I o M o co 0_ a a 0_ co a a 0_ a A03 m m J 7 J M M M M M M M M M M b p. a a v p N 0 p E 0 0 0 0 0 0 0 0 0 0 = CC Ce Ce Ce Ce CC Ce Ce CC Ce g MM J m J J J m p J J N M M M M M M M M M M N N O T E c CEL p T E C C it N." N a-, N,� N:= N N N N N N D O 0 0 0 0 - N .. N • N;�, N "'• N N N N N N N a wct 0)s.., W mEt o0miv Q) a0 a> a0 a0 a a a a aw a J 0 0 w c0 € E - ( 0 0 E € m (Dm (9�1 Cog Cop- 0 0 0 0 00 00 ai ui m'� o o` m.=3 o o aim ai rn ai rn aim ai hi hi ai ai 6> m C90JLLa g .00_, is m O O p p H LE a J00000 (,(n J00000 0 LLJ IL J LLJ LLJ LL IL..- it LE,..- Em I.L p) u) U U V» »> a' "p»»> U O C U c U u) U u) U w, U w U w U w U J U J P, I c c CCCCC mW CCCCC c EV "c o 'c v 'c 'cam 'c0 'c0 'c0 'c c 0 0 o 0 0 0 0 0 0> o o> o p o 0 ;9 00000 �0 00000 — E E H 2E2222 on 2222 € m m a a to �� � m Q �o ��i � � E � c � c � � � � � E � � J I R _2 A;' . ' W C ' _ _ R m N p N p 2 T T p R p N p 2 p N o N o ce J N ,W W u-NNNNLo N2 LLNNNNlO Wa LULL LULL WD WD WJ WJ W J W J W0 W0 Ojr..- n n n n n n n n n n n n a N x000 0 0. 0 0 0 0 0 0 0 0 0 0 N 5....! N N N N N N N N N N N N N W < o) o) a W a) O) M M O) 0) 0) CM m a/ a to 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, r 0 W v J U • o Z8 — n n 0 ▪ a+ M M V CV 0 CV J o m Mr- c v v � � •cro co o co o3 co 0 c E l 1 V N U o J00 Q 0m H W a M r n , — N O N G c--.!~ N CON N in Lc) am N N pl Q O• ° N °' Q ° E . a 0 d 0 m E z u) m m mm m m m m m m m m m m d m m m -o m m m m m m m m m m m 3 n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m m --1 I J as as co co co co co co co co as co co j CD 3 m _m O) _m _m 01 O) O) _m _O1 O) o D D J 2 0 0 0 0 0 0 0 0 0 0 b o > I M M C') M V mr a V V V V V V V 7 o co ~ iln n n n n n n n n n n n n n n n F- co co co co co co co co co co co co co co CO co 1- N N N N N N N N N N N N N N N N 0 N U •, ' 000 0 0 0 0 0 0 0 0 0 0 0 0 0 U. O d 0 0 0 p p p 0 0 0 0 0 0 0 0 0 0 0 d , W W J J J W LU W LU LU W W W W W W • r 0 0 0 ° ° 3 - 0° z° 0 00 1as C C O O E E 0 M ev o 0o o 0 0 -a ca 0yo co cc ce 0 m 0 ' •x N 0 4- D. C C SJ MU CC •- EO O v N 0 0 0 o V V 0M i jn 0 M M 0 O LL a _1 _1 x co co > > o I I I '-'Ia a to N N N N N N N N N N N N a E NNNNM 0 L 'mm m m m M m m m m m m M CO CO m V ^O c a a a a a a a a a a a .cs a N ig Z 10 0 0 0 0 0 0 0 0 0 0 0- 0 0- aO0OO E o LY CC CC CC Ce CC CC ea C co CZ Qco co co_w- _M-o co co co co co co M no; co M M CO _M M _M CO a) N N N V N 0- N N N N N N N 7 N 7 7 N N N N a it N li N N N 0- N N N N N N N N N N N N N N N N ' N a a a0 a0 a a a a a a a a a a a a 0 a 0 W m a 0 0 0 0 i_ 0 0 0 0 0 0 0 , 0 ca co 0 0 0 0 z s 0 Qas i o• Gi Gi 0) Gi C) Ui Ui Ui ui ui N N N N N N N N N N (6 O a) I.L Li: it J it J ll. it ii it I1 w it V it I1 it it it it Il LL lL s u) - U p- U . O U) U N U U U U U VO- 0 �' 0 0 0 0 U U U 0 U U C 0 It m E E 0 c.2 c.2 c c" -c c`- c E 0 -E -E 'E E c c c E E o" c r c m o0 0> of of o-o o a of o a o0 0> o 0 0 0 0 0 0 0 0 �o og o 1� u) v v~ c o , 0 a 0 0 a 0 0 0~ 0 0 0 0 0 0 0 0 0 0< U J v V 02 rn a)la �i >, a) >, a)D a)> a)a a)> a) o a) o a) a) a) as a) a) a) a) a) n w a)m a) IX J W J W .J W 0 W O w 2 W H w 2 W H W J W J W W W W W W W W W N 2 W 0 W On n n n n n N n n N n n n n n n n N. n n N- - 11 Q. N 0 o 5 5 5 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 !i N N N N N N N N N N N N N N N N N N N N N W O) O) O) O) O) O) O) O) O) m m O) O) O) O) 0) ce a o o a� a QaQ o a� aco� a a a a a a a a a (a) • o Q o 00 0 o J Q• 0 ' Q. r- ° crn o 0 ' � 0 0 N a) O COa N E o N 0 a J < CI Izi M W CZ 1 M II ._ n0 5 N G ~ i)N /� N W N A Z 0 Q ¢0c o ) < c E G Zo ti E v c m c()Z as m m m m m m co as m co co co co as co co as co a) as as 3 co co co co co co co co m co m m m as -co' m is m m m -o m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co 0 0 o CO Co CO CO m CO CO CO as CO CO CO CO as as CO CO as CO 2 TOO Ti rn 'rn E rn_ o an m -rn a) o) m 'o) a) rn a a rn o_) o_) o rn rn o 0 0 0 0 0 b b 0 0 0 0 0000000003 0 0 co > v a v v v v v v v v v v v v v v v v v n n o ~ N. R 7 n N r- N- N- N- N NN N n n n n n n n n N Is CO CO CO 0 0 CO CO CO CO CO CO CO 0 CO CO CO CO CO CO CO 0 CO N N N N N N N N N N N N N N N N N N N N N N N ,i CO O 0 O N U • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 Q a. 2 Iw w w w w w w w w w w w w w w w w w w J w w • • O co 7:::1 0 N IS11)0 c(D'IT O Z O >- >- >- a O N JCI 0 CO C0) 5 p co t co A O M d C Ali 4� m O)co o Q L O Z I- L .c y0.c c� !1 n H 0 a H p2 e 2 Ui 0 U I1 J 2 O QI ' .. N 1 0u) C N Q Q 1! y a> 0 Z Z w co UJ o E a :• v N.w 8 2 a a a✓ `-/ c Ii N aJ N 2 1d N 0CL u) 0 pLE 7 �,r d O N �a N. W Q to Z vi aS 1 rn ca ns r -- N. ii E W VJ N N N N N ui N Ty VS O > N N N E J E 1 Z O O d N c ICE .° 0' o o I ` W O J 0. 1 .....11 . = E D IIII CL ti 0 d 2 U U o N ON o 1 N CO E Q .y, o 0 // �� ` III, . U d o J } O E o Q m N-1 o v H C m a I— M n I�1 C N a- N E I— _ O N N 0 um N iii= co /� M N c F E W I-a. O 0 0 O E MW L. icz r ,- CO _ 0 N ! Cl) 1- z a3 N a0 O O •U N c II a7 V/ Z p c c ° Cl C Q ci a E II ° O z m T 0 d U pII E p S Z cn I I m 1 r-- I-- 0 m •° • .7 C6E Ak Z N N I O 2 I N I p J o • o ° •I n CO ~ w E n p :151:13°)CD; ✓ Ncu W t� co Il; W O O N IL N °) rn rn C w ▪ co E !U U U O cc Cw.1 0 ai c I m G OO) N Z H C ~ a3 Z C f0 O N V as U F. V r) a 3 o a a 2 0 E •Q .O a.o °' z o ° a°> O o ao5 p o o L 0 CL 0 V 0 a V 0 • • 21 7086 Debra Oudean Hilcorp Alaska, LLC 7 5 GeoTech II 3800 Centerpoint Drive, Suite 100 RECEIVE nchK 11A ele:orage907,777 83303 Nilrnrp Alnrka.1.J.A. Fax: 907 777-8510 DATA LOGGED NOV 09 2017 E-mail: doudean@hilcorp.com M. BENDER DATE 11/07/2017 AOGCC To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician II 333 W 7th Ave Ste 100 DATA TRANSMITTAL GP 22-13RD3 217-086) Prints: Radial Cement Bond GR/CCL Log CD: CBL Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: f1/'91:zLan4Ld<; 5Date: 1110 pri-- o6G Debra Oudean Hilcorp Alaska, LLC l 2 2— AK_GeoTech 3800 Centerpoint Drive, Suite 1400 r - Anchorage, AK 99503 l (0 Tele: 907 777-8337 Hilernrh 1.1.{; Fax: 907 777-8510 ' ( E-mail: doudean@hilcorp.com t�Q DATE 10/23/2017 To: Alaska Oil & Gas Conservation Commission Meredith Guhl, Petroleum Geology Assistant 333 W. 7th Ave. Ste#100 Anchorage, AK 99501 DATA TRANSMITTAL P 22-13RD3 (217-086) GP 22-13RD3 PB1 GP 22-13RD3 PB2 Transmitted herewith are cuttings RECEIVED r H OCT 2 3 2017 BOX'# SAMPLE`INTE12111I'L GP 22-13RD3 1 OF 2 8490'-10200' AOGCC ` (p 2.0 GP 22-13RD3 2 OF 3 10200'-11760' GP 22-13RD3 3 OF 3 11760'-12956' 11024----> GP 22-13RD3 PB1 1 OF 1 10740'-11781' GP 22-13RD3 PB2 1 OF 2 10110'-11850' t(022, GP 22-13RD3 PB2 2 OF 2 11850'-12337' Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: „;JL_ Date: � t 3 • STATE O • F ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil ❑., 1 Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development Q • Exploratory ❑ GINJ ❑ WINJ ❑ WAG❑ WDSPL❑ No.of Completions: _1 Service ❑ Stratigraphic Test ❑ 2.Operator Name: 6. Date Comp.,Susp., or 14. Permit to Drill Number/ Sundry: Hilcorp Alaska, LLC Aband.: 9/22/2017 , 217-086 • 3.Address: 7. Date Spudded: 15.API Number: 3800 Centerpoint Drive,Suite 1400,Anchorage,AK 99503 August 15,2017 . 50-733-20095-03-00 . 4a.Location of Well(Governmental Section): 8.Date TD Reached: 16.Well Name and Number: Surface: 2379'FNL, 1375'FWL,Sec 13,T1ON, R12W,SM,AK September 11,2017 Granite Pt St 22-13RD3• Top of Productive Interval: 9. Ref Elevations: KB: 115' 17.Field/Pool(s):Granite Point Field 2490'FSL, 1629'FEL,Sec 13,T1ON, R12W,SM,AK GL:0 BF:54.2' Middle Kenai Oil Pool • Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 990'FSL,72'FEL,Sec 13,T1ON, R12W,SM,AK 11,670'MD/10,312'TVD • ADL018761 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 263405 y- 2544551 Zone- 4 12,956'MD/10,745'TVD 1 N/A TPI: x- 265676 y- 2544094 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 267202 y- 2542563 Zone- 4 365'MD/365'TVD N/A 5. Directional or Inclination Survey: Yes U (attached) No ❑ 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 75 (ft MSL) 8,495'MD/8,151'TVD 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity, porosity, magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary ROP GM ADR CTN ALD MD GM ADR CTN ALD TVD Formation Log MD/TVD LWD Combo Log MD/TVD Gas Ratio Log MD/TVD Drilling Dynamics Log MD/TVD Final Well Report. CBL to be submitted once received. �_ R CE VED OCT 202017 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEM PULLED 5" 23.2# L-80 6,178' 11,800' 6,154' 10,376' 6" 227 sx 24.Open to production or injection? Yes Q No ❑ 25.TUBING RECORD If Yes, list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number; Date Perfd): 2-7/8"x 2-3/8" 10,540'MD 10,312'MD/9,610'TVD 10,556'-11,561'MD/9,801'-10,261'TVD 3-1/8",6 SPF 26.ACID, FRACTURE,CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes❑ No Q c(/Z Vi'F Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED Lt.— 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): 9/22/2017 Gas Lift Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 9/29/2017 24 Test Period ..►11 12 92.4 N/A 1090 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 59 649 24-Hour Rate — 11 12 92.4 32 Form 10-407 Revised 5/2017 Vi.-- flibi'll,C011TINUED ON PAGE 2 RmIGINIAL oS l wlkW- r y7. RBD7diS L OCT4 [u lir 28.CORE DATA Conventional Co ): Yes ❑ No Q Sidewall Coreses ❑ No Q If Yes, list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� Permafrost-Top If yes, list intervals and formations tested,briefly summarizing test results. Permafrost-Base Attach separate pages to this form, if needed,and submit detailed test Top of Productive Interval 10,556'C-6 9,801' information, including reports,per 20 AAC 25.071. Cl 9,285' 8,738' C2 Coal 9,655' 9,052' C2 9,722' 9,109' C-5A 10,188' 9,505' C-6 10,550' 9,797 Formation at total depth: C-7 • 31. List of Attachments: Wellbore Schematic, Decomplete, Drilling and Completion Reports, Definitive Directional Surveys,Csg and Cmt Report. Information to be attached includes, but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report, production or well test results,per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name:Paul Mazzolini Contact Name: Cody Dinger Authorized Title: Drilling Manager Contact Email: cdinger_hilcOrp.Com Authorizedf�` Contact Phone: 777.8389 Signature: Date:� Date: 2,0 t 7 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection, Salt Water Disposal,Water Supply for Injection, Observation, or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 19: Report the Division of Oil&Gas/Division of Mining Land and Water:Plan of Operations(LO/Region YY-123), Land Use Permit(LAS 12345), and/or Easement(ADL 123456)number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension, or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions, core chips, photographs,and all subsequent laboratory analytical results, including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only Granite Point Platform • Well: Granite Pt St 22-13RD3 41) Last Completed:09/22/17 SCHEMATIC PTD:217-086 API: 50-733-20095-03 Hilcorp Alaska,LLC KB=42.3'or 115'RKB from MSL CASING DETAIL ISize Wt Grade Conn ID Top Btm 26J26" Conductor Surf 294' L 18" 70.59 B Surf 600' 13-3/8" 9-5/8" 61 J-55 BTC 12.515" Surf 3,989' 40 ip N-80 BTC 8.835" Surf 6,409' 18" 43.5 N-80 BTC 8.755" 6,409' 6,643'TOW 7" 29 L-80 BTC 6.184" 6,360 8,495'(TOW) 2 5" 23.2 L-80 Hydri1513 4.044" 6,179' 11,800' 13-3/8" TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441" Surf 6,112' TOC@ I., MB3 2-3/8" 4.7 L-80 8rnd EUE 1.995" 6,112' 10,501' 5,864' ',u h bPi I El 9-5/8" ''' ► JEWELRY DETAIL No Depth Depth ID OD Item (MD) (TVD) 49' 49' Tubing Hanger MU II1 359' 359' 2.313 4.910 SCSSV 2,494' 2,485' 2.441 4.330 GLM#1 2 4,327' 4,310' 2.441 4.330 GLM#2 5,717' 5,697' 2.441 4.330 GLM#3 1 3 6,112' 6,089' 1.995 3.700 Crossover 2-3/8 EUE 8rd x 2-7/8 EUE 8rd I 6,739' 6,711' 1.995 3.330 GLM#4 7,473' 7,403' 1.995 3.330 GLM#5 8,6@ 4 8,240' 7,996' 1.995 3.330 GLM#6 9,006' 8,503' 1.995 3.330 GLM#7 7Lii ' 9,609' 9,013' 1.995 3.330 GLM#8 ' 10,213' 9,527' 1.995 3.330 GLM#9 Halliburton ROC Gauge Mandrel w/0.25" 5 10,262' 9,569' 1.975 3.669 TEC wire 10,271' 9,576' 1.970 3.210 RA Marker Sub TOC @ �` 4 6 10,312' 9,610' 1.925 3.750 4-1/2"DHL Hydraulic Retrievable Packer 8770, 7 10,331' 9,626' 1.875 2.730 X Nipple 10,501' 9,760' 1.935 3.155 Ported Sub 10,541' 9,790' N/A 3.125 Mechanical Firing Head 8 10,556' 9,801' N/A 3.125 TCP Assembly(3-1/8 6 SPF RDX Super DPTCP Guns) fir" ' 11,562' 10,262' N/A 3.125 Lower Firing Adapter E 11,563' 10,262' N/A 3.125 Absolute Pressure/Time delay Firing Head ��v �N a is" 5 _' = 6 PERFORATION DETAIL 4, � Top Btm Top Btm ••• 6 Zone (MD) (MD) (TVD) (TVD) FT Date Status Comment _ ' - C-6 10,555' 11,560' 9,800' 10,261' 1,005' 09/22/17 Open 3-1/8"6 spf s . • = C-6 ° t. • _ T i RFD:11,670' TD:12,956' MAX HOLE ANGLE=67.84°@ 11,002' Updated By:JLL 10/19/17 • • i Hilcorp Energy Company Composite Report Well Name: GPF GP 22-13RD3 Field: County/State: ,Alaska I(LAT/LONG): :vation(RKB): API#: Spud Date: 8/17/2017 Job Name: 1711827D GP 22-13RD3 Drilling Contractor Kuukpik 5 AFE#: AFE$: MOVibitg . ..... ............ 8/8/2017 Pre test BOP 250-3500PSI Low-High,remove test joint and stand back same,continue to rig up top drive,install light in derrick,and replace tugger sheave secondary safety line.;Continue to prep for hanging service loop,while working on crane. Continue with welding.and painting projects.;Continue working on crane replacing seal in boom motor,Color code lines in sub,complete installation of secondary egress from rig floor to heliport,and review procedure to switch from rig power to;platform power. Tie in gas detection to platform system,and wire in remote accumulator panel into platform UPS system. String out service lines,measure and attach to bridle.;Move equipment and organize deck to receive multiple loads form work boat.Offload Top Drive service loops and drill pipe. Temporarily release work boat in order to hang Top Drive service lines.;Uncrate and lay out large service lines(4 total).Install flanges in hanger bracket and make up loose fittings on hoses(came installed on hoses hand tight and without any thread compound).;Set saddle with small service lines on hanger bracket and secure.Hoist service loop into derrick and hang off.Install secondary safety restraint on service loops.;Adjust service loops and rehang in order to remove lines fout of the path of T.D.and out of collar finger access.Off load tubulars and mud products from work boat. 8/9/2017 Rearrange top drive service cables,due to excessive slack in service loop. Reposition anchor point for service loop bridal in derrick,connect service loop to top drive per NOV representative,;and assist electrician with running cables for top drive.;Continue to connect service loop to top drive,securing cables and lines clamps with safety wire. Loosen clamps on bridle,slipping service lines to even out same.;Continue slipping and evening out auxiliary service loop lines in bridle.Tighten clamps up and test run T.D.up through derrick checking clearances of service loops.Identified several potential;catch points that may require deflectors to be installed on mast.Transfer LVT to ISO on HAK deck.Offload mud products and misc equipment from work boat and backload boat with misc equipment.;PJSM,organize service lines in cable tray on bridge from dance floor to rig.Run service lines under dance floor,coil up on top of utility module and run through slots in dance floor to VFD and HPU.;Continue to run electrical service line under the dance floor,coil up on utility module and through slots in dance floor to VFD. Hang kelly hose in derrick and make up to T.D. 8/10/2017 Assist electrician running cables to NOV VFD,and HPU,terminating same. Test run top drive,trim guards on top drive to accommodate Kelly hose,tighten and secure same.;Commission top drive per NOV representative,install service loop guards,and function test BOP remote;Finish installing service loop guards, and commissioning T.D. Wire tie service loop bracket bolts,remove shipping brackets from T.D.dolly extend and function test same.Install bales and elevators,;and tighten up kelly hose.;Rig up to test BOP on 3-1/2"pipe.Fill system with water.;AOGCC representative Adam Earl on site to witness BOP test. Test annular to 250 psi/2500 psi,and test gas alarms.;Test upper rams to 250 psi,attempt to pressure up to 3500 psi on upper pipe rams experienced leaks on driller's side of both upper pipe and blind ram door seals,targeted tee on kill line,;LDS and graylock clamp at well head. Change out door seals on driller's side doors on upper pipe and blind rams.Tighten flange on target tee and run in packing on LDS.;Tighten graylock clamp with well head hand.;Test choke manifold valves,floor safety valves,upper and lower IBOP vales,kill and choke line valves,upper and lower pipe rams to 250 psi/3500 psi on 3-1/2"pipe.;Lay down 3-1/2"test joint and make up 4-1/2"test joint.Test blind rams(250/3500)while making up 4-1/2"test joint. Test annular on 4 1-2"pipe to 250/2500 psi.;Test upper and lower pipe rams to 250/3500 psi on 4-1/2"pipe,function test remote and manual chokes,perform accumulator drawdown test,200 PSI 20 second.full recovery 118 seconds 8/11/2017 Pull and lay down test joint,with left handed blank testing sub,remove 3"CIW BPV;Make up landing joint and screw into top of tubing hanger,pull same to floor,with 40K coming off hanger,removed tubing hanger,rigged up WOTCO tongs,performed a PJSM on laying down tubing.;Pull out of hole laying down 3 1/2"IBT from 2000'to 450';Continue to trip out of hole laying down 3.5"IBT from 450'to surface,and rig down WOTCO;Rig up Pollard E-line, run in hole with Baker 7"CIBP,set top of CIBP at 8514',had good indication of plug setting,picked up and set down to confirm set,pull out of hole and rigged down Pollard;Test casing to top of CIBP at 8514 to 2000 PSI for 30 minutes(Chart reading 2050 PSI at start and at 2025 PSI after 30 minutes.)(Had a 145 PSI increase in pressure on 13 3/8"x 9 5/8"annuls.);Run hoses for vacuum,Oil States crane mechanic replacing seal in main hoist motor. Screw into joint in slips hang block,conduct PJSM,slip 18 wraps of drilling line off drum.;Cont.working on Sea-Trax crane.Install hose clamp on rotary hose at top drive.Install hose clamp on shock hose in lower sub base.Rig up and test high pressure mud line to 4200 psi.Good test.;Rig up and RIH picking up 4-1/2"CDS-40 drill pipe. (Work on Sea-Trax crane suspended for the night @ 23:30);Continue to pick up and RIH with 4-1/2"CDS-40 drill pipe to 604';Add 3 drums of hydraulic fluid to rig HPU.;Continue to pick up and RIH with 4-1/2"CDS-40 drill pipe to 3546' 8/12/2017 Perform rig service,check fedder clamp bolts on draw works all good,draw works making noise;Continue to trip in hole picking up CDS-40 drill pipe from 3546 to 3671,noise getting worse.;Trouble shoot noise on draw works,change out DS hydraulic motor,inspect gear box slight amount of metal in bottom from break in of new gears.;Complete motor swap test run draw works up and down sounded good ran 4 joints of drill pipe and had same issue with noise.;Continue to trouble shoot draw works,while installing safety isolation retrofit kit,removed bell guide and 4 1/2"IF saver sub,attempt to install new CDS-40 saver sub,;found OD to be 1"too big on new saver sub,sent sub to town to have OD turned down,and change oil in HPU. Could not get signal from NOV VFD to Kuukpik PLC.;Remove long bails and elevators.Install CDS-40 saver sub on top drive.Change out gripper blocks and install bell guide for 4-1/2"drill pipe.Install 9' bails and elevators.;Continue to trip in hole picking up CDS-40 drill pipe from 3671'to 4657';Continue to trip in hole picking up CDS-40 drill pipe from 4657'to 5894'.;Unable to start Link Belt crane to load pipe in V-door,changed out starter on crane,rotate stand pipe 1/8th turn and organize storage area under HAK deck while waiting on crane repairs.;Continue to trip in hole picking up CDS-40 drill pipe from 5894'to 6486'. 8/13/2017 Continue to pickup and run in hole with drill pipe from 6641'tagging top of CIBP at 8513'DPM,(8514'WLM).;Stand back stand,had to adjust top drive for standing back pipe,Pipe is riding back side of table,prep to level the derrick and adjust T-bar on top drive rail.;Level derrick,adjust T-bar to center over well, NOV representative calibrated counter balance/stand jump setting on top drive,change out drill pipe elevators.;Trip out of hole from 8466'to 67'leaving 1 stand in the hole.;Service top drive,blocks and drawworks.;Make up top drive into stump in rotary table and hang blocks in derrick.Spool drilling line off of drawworks drum.;Measure deflection and end play on both ends of drawworks shaft and gearboxes-NONE. (Sea Trax crane put back in service at 01:00);Remove drawworks motors and gear box from ODS side.Inspect and change out seals.;Wellhead pressures:20"=31 psi,13 3/8"=38 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 6.0 hrs, Total:12.0 hrs. Metal recovered today: 0.0 lbs. Total:0.0 lbs • • 8/14/2017 Continue to work on draw works ODS gearbox,check for end play,adjust bearing thrust,removed a shim where seal seated reinstall gear box with new seals, and hydraulic motor,;hook up hoses and test run same. Checked for noise,heat and vibration,appeared to be good. Plan to check again with a load. Drain DS gear box and pull encoder plate inspected bolt all good.;Drilling line that was removed from drum earlier appeared to be deformed,it was cut off and new line slipped on.;Stage equipment and pickup Baker whip stock,anchor pined with 4 screws with a shear value of 13000#,connected to window mill with a 35K shear bolt,complete with upper and lower watermelon mills,;picked up Sperry MWD and scribed same,continue picking up 8 drill collars and 18 joints of HWDP.;Trip in the hole with Whipstock BHA to 1573'(Shallow hole test MWD 295 gpm=770 psi at 958');Change out bails and adjust link tilt.;Continue tripping in hole with Whipstock BHA to 3376';Service drawworks,top drive,blocks and crown;Continue tripping in hole with Whipstock BHA to 8465'.;Orient Whipstock to 45°right of high side as per directional driller and Baker rep,Set down @ 8513'and shear anchor with 8k down wt.Pull up to 5k over,shear pin on Whipstock with 26k down weight.;Clean pits for receiving OBM to displace well with.;Wellhead pressures:20"=31 psi,13 3/8"=38 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 6.0 hrs, Total:18.0 hrs. Metal recovered today: 0.0 lbs. Total:0.0 lbs 8/15/2017 Clean and prep pits,for OBM displacement, draining water to production,build spacer,hook ISO tanks to drain to pits,and repair mud trough over pit 5.;PJSM, transfer mud from platform beam tank to pits.Reseal 2 pumps on HPU#2.Install drip pan on back of shakers in cellar.;Hold PJSM.Build spacer in pill pit and displace well to OBM at 3 BPM/480 psi taking returns to production.;Circulate OBM back to pits.Bring on volume from ISO tanks.Circulate and conditon mud f�A @ 6 bpm 1500 psi.;Pick up single of drill pipe.Establish paramaters UP=132,DN=120,ROT=121,90RPM,TQ=3.5K.TOW @ 8495',300 GPM=2000PSI;HPU#2 blew off radiator hose.Reattach hose and add glycol to radiator.;Mill window per Baker Oil Tool from 8495'to 8496'with 300 GPM, 1900 PSI,90 RPM,3.5K TQ,0.5 WOB.;Repalce leaking o-ring on HPU#1.;Mill window per Baker Oil Tool from 8496'to 8508'with 300 GPM,1900 PSI,90 RPM,3.5-7K TQ,0.5-5.5K WOB.(MW IN 8.9/VIS 96,MW OUT 9.2/VIS 93);Mill formation from 8508'to 8528'with 281 GPM,1780 PSI,90 RPM,4-5K TQ, 7-8K WOB.(MW IN 8.9/VIS 83,MW OUT 8.9/VIS 75)Ream through window 5,pick up through window W/O ROT-No Issues;Circulate and condition /4\1 bottoms up for FIT.;Wellhead pressures:20"=28 psi,13 3/8"=30 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 1.5 hrs, Total:19.5 hrs. Motal rocevored today: 1O(l the Tnfal•1')f1 Ihn 8/16/2017 Perform FIT to 1 .5 opa EMW.Good test.;Drill rat hole from 8530'to 8560'.15 K WOB,115 RPM,5-7 K torque.;Circulate high-vis sweep around with no visible increase in cuttings.290 GPM/1800 psi.;Work through window with packing off issues.Work through several times until cleared up.Did not see additional over pull through shoe.Pull up to 8420'.;Pump dry job.POOH from 8420'to 8395'.;Adjust top drive service loop.NOV tech attempted to initialize TDS safety isolation refit but was unsuccessful.;POOH with whip stock milling assembly from 8395'to 2880'.;Continue POOH with whip stock milling assembly from 2880' to 1296';Service rig drawworks,top drive,blocks and crown.Parallel rig motors and load test.Good load sharing observed during test.;Continue POOH with whip stock milling assembly from 1296'to top of BHA at 878';Continue POOH laying down HWDP,DC's and whip stock milling assembly and clear rig floor. Upper mill in gage.;Pick up drilling BHA as per Sperry directional driller. (PDC MM53D bit,Geo-Pilot 5200 EDL,Stb,Ref Housing Stb,4 3/4"GM,Inline Stb, 4 3/4"ADR,4 3/4"ALD,Stb,4 3/4"CTN collar,4 3/4"PWD,;4 3/4"DM Collar,4 3/4"TM Collar,Float sub,3 ea.Flex Collars,X/O,4 1/2"CDS40 HWDP,X/O, �►,I Jar,X/O,4 1/2"CDS40 HWDP=302.37');Upload MWD and load sources.;Continue to pick up drilling BHA as per Sperry directional driller.;Wellhead pressures:20"=28 psi,13 3/8"=60 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 49 lbs. Total:169 lbs. 8/17/2017 RIH with BHA#2 picking up drill pipe from 302'to 1353'.;NOV tech upload new software for TDS safety systems.;RIH with BHA#2 from 1353'to 5525'.Fill pipe every 2500'.;RIH with BHA#2 from 5525'to 8546'.Fill pipe every 2500'.Did not see TOL at 6360'or window at 8495'to 8508'.;Obtain SPR's.Obtain parameters:125 K P/U,119 K S/O,65 RPM/3.3 K torque,250 GPM/1900 psi.;Wash and ream with above parameters from 8546'to 8560'.;Directional drill from 8560'to 8575'as per WP05.;Continue to directional drill from 8575'to 8632'. 125 K P/U,119 K S/O,120K ROT,86 RPM/3-6 K torque,2-10K WOB,250 GPM/2950 psi.;Service TD,swivel packing and blocks.Change out air boot on flow box to flow line outlet;Continue to directional drill from 8632'to 8705'. 124 K P/U,110 K S/O,114K ROT,120 RPM/3-6 K torque, 8-10K WOB,265 GPM/2130 psi.;Continue to directional drill from 8705'to 8890'. 126 K P/U,110 K S/O,116K ROT,120 RPM/4-5 K torque, 7-11 K WOB,261 GPM/2130 psi.Pumped weighted high vis sweep @ 8839';Wellhead pressures:20"=31 psi,13 3/8"=100 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 8 lbs. Total:177 lbs. 8/18/2017 Continue to directional drill from 8890 to 9125'. 126 K P/U,110 K S/O,116K ROT,120 RPM/4-5 K torque, 7-11K WOB,261 GPM/2200 psi. Pump high vis sweep @ 8839' (75%increase in cuttings).;Continue to directional drill from 9125' to 9398'. 126 K P/U,110 K S/O,116 K ROT,120 RPM!4-5 K torque, 7-11 K WOB,261 GPM/2200 psi. Pump high vis sweep @ 9234'(25%increase in cuttings).;Continue to directional drill from 9398' to 9645'. 135 K P/U,116 K 5/0,123 K ROT,123 RPM/3-7 K torque, 8-10 K WOB,260 GPM/2320 psi. Pump high vis sweep @ 9543'(10%increase in cuttings).;Continue to directional drill from 9645' to 9835'. 135 K P/U,116 K 5/0,123 K ROT,110 RPM/3-7 K torque, 8-10 K WOB,260 GPM/2300 psi. Pump high vis sweep @ 9791'.;Finish pumping sweep around and observed a 50%increase in cuttings.;Short tripping out of hole to 9197'.;Wellhead pressures:20"=31 psi,13 3/8"_ 100 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 8 lbs. Total:185 lbs. 8/19/2017 Short trip out of hole to 9167'on elevators without issue.;RIH picking up drill pipe to 9792'.;Wash and ream 9792'to 9835'.;Directional drill from 9835'to 9980'. 140 K P/U,116 K 5/0,123 K ROT,110 RPM/3-7 K torque, 8-10 K WOB,260 GPM/2400 psi.;Directional drill from 9980'to 10,260. 140 K P/U,116 K 5/0, 123 K ROT,110 RPM!3-7 K torque, 8-10 K WOB,260 GPM/2400 psi.;Directional drill from 10260'to 10411'. 142 K P/U,122 K S/O,130 K ROT,100 RPM/ 4-8 K torque, 4-12 K WOB,265 GPM/2450 psi,10.2 ECD;Sweep pumped at 10285'came back 10 bbl.late with a 10%increase in cuttings,mostly fine cuttings.;Directional drill from 10411'to 10600'. 142 K P/U,123 K S/O,129 K ROT,140 RPM/4-6 K torque, 3-7 K WOB,232 GPM/2010 psi,10.0 ECD;Wellhead pressures:20"=35 psi,13 3/8"=155 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 7 lbs. Total:192 lbs. • • 8/20/2017 Directional drill from 10600'to 10704'. 142 K P/U,123 K SIO,129 K ROT,140 RPM/4-6 K torque, 3-7 K WOB,232 GPM/2010 psi,10.0 ECD.Decision made to pull bit due to penetration and build rate.;Circulate hi-vis sweep while rotating and reciprocating pipe.Sweep brought back 20%increase in cuttings/20 bbls late.;POOH on elevators without issue and no over pulls into window(did not see window)to 8450'.P/U 156 K,S/0134 K.;Continue POOH with BHA#2 from 8450'to 6247'.;Service crown,drawworks,blocks and top drive.Check oil in HPU#2.;Continue POOH with BHA#2 from 6247'to BHA.;Stand back HWDP,Jars and Flex collars.Remove sources.Download MWD. (Calc.hole fill=58 bbl,Actual=62.1 bbl);Continue to download MWD.Lay down BHA. Blades worn down to body on Inline Stabilizer(apx.1/4"wear).Graded bit 2-1-CT-C-X-NO-PR(2 center cutters chipped);Pick up BHA#3. (PDC MM53D bit, Geo-Pilot 5200 EDL,Stb,Ref Housing Stb,4 3/4"GM,Inline Stb,4 3/4"ADR,4 3/4"ALD,Stb,4 3/4"CTN collar,4 3/4"PWD,4 3/4"DM Collar,4 3/4"TM Collar,;Float sub,3 ea.Flex Collars,X/O,4 1/2"CDS40 HWDP,X/O,Jar,X/O,4 1/2"CDS40 HWDP);Upload data to MWD,perform shallow hole pulse test of MWD,load sources into MWD.;Wellhead pressures:20"=35 psi,13 3/8"=155 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 0 lbs. Total:192 lbs. 8/21/2017 Finish picking BHA#3.Hold safety stand down with crew after dropping drill collar stand across derrick due to negligence.;RIH with BHA#3 to+-2500'.Fill pipe.;RIH with BHA#3 from 2500'to 6490'.Did not see Top of Liner.;Break in GeoPilot as per directional driller.;RIH from 6490'to 8490';Cut/Slip 129'of drilling Iine.;RIH from 8490'to 10,661'.Did not see window.Took 20k wt.at 10,146'and 10,510',picked up both times and went through without extra wt. second time down. Calc.disp.=57.3 bbl/Actual=60.4 bbl;Make up top drive and break circulation.Wash and ream from 10,661'to bottom @ 10,704'.;Directional drill from 10,704'to 10,770'. 148 K P/U,122 K S/O,132 K ROT,120 RPM/4-6 K torque, 6-10 K WOB,231 GPM/2075 psi;Directional drill from 10,770'to 11,024' 150 K P/U,124 K S/O,133 K ROT,120 RPM/4-6 K torque, 8-10 K WOB,210 GPM/1730 psi;Wellhead pressures:20"=29 psi,13 3/8"=80 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 0 lbs. Total:192 lbs. 8/22/2017 Directional drill from 11,024'to 11,283' 151 K P/U,124 K S/O,135 K ROT,120 RPM/4-6 K torque, 8-10 K WOB,230 GPM/2050 psi.Pumped sweep at 11095725%increase/8 bbls late;Ream out severe dogleg from 11,220'to 10,255'as per DD.;Directional drill from 11,283'to 11,470,152 K P/U,122 K S/O, 135 K ROT,120 RPM!4-7 K torque, 6-7 K WOB,230 GPM/2050 psi.;Directional drill from 11,470'to 11,720,152 K P/U,121 K S/O,131 K ROT,120 RPM!4- 7 K torque, 5-6 K WOB,230 GPM/2250 psi.Pumped sweep at 11532'/10%increase/10 bbls late;Distance to Plan:33.13'(29.42'Low/15.22'Left);Wellhead pressures:20"=29 psi,13 3/8"=135 psi Fluid loss to well today:0.0 bbls. Total:0.0 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 0 lbs. Total:192 lbs. 8/23/2017 Directional drill from 11,720'to 11,781',152 K P/U,121 K S/O,131 K ROT,120 RPM/4-7 K torque, 5-6 K WOB,230 GPM/2250 psi.;Circulate and condition at 280 GPM/2950 psi.;POOH on elevators to 10,250'without issue. P/U 168 K,S/O 121 K;Circulate and reciprocate pipe while waiting on orders.;RIH to 10,717';Begin open hole sidetrack.Trough from 10,714'to 10,749'with 140 rpm/4.5-5 k trq,245 GPM/1750 psi.;Sidetrack time drilling 1/10th ft per 5 min from 10,749'to 10,750'with 140 rpm/4.5-5 k trq,250 GPM/2350 psi.;Change out leaking air boots on bell nipple.;Sidetrack time drilling as per DD from 10,750'to 10,758'with 140 rpm/4.5-5 k trq,250 GPM/2350 psi.;Wellhead pressures:20"=29 psi,13 3/8"=75 psi Fluid loss to well today:36 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 0 lbs. Total:192 lbs. 8/24/2017 Sidetrack time drilling as per DD from 10,758'to 10,766'with 140 rpm/4.5-5 k trq,250 GPM/2350 psi.;Sidetrack time drilling as per DD from 10,766'to 10,768'with 140 rpm/4.5-5 k trq,250 GPM/2350 psi.Bit stopped taking weight.Appears to be back in original hole.;Pull up to 10,752'.Sidetrack time drill as per DD from 10,752'to 10,760'. 140 rpm/4.5-5 k trq,230 GPM/2050 psi,minimal WOB;Sidetrack time drill as per DD from 10,760'to 10,766'. 140 rpm/4.5- 5 k trq,230 GPM/2015 psi,minimal WOB;Wellhead pressures:20"=29 psi,13 3/8"=150 psi Fluid loss to well today:36 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 7 lbs. Total:199 lbs. 8/25/2017 Sidetrack time drill as per DD from 10,766'to 10,775'. 140 rpm/4.5-5 k trq,230 GPM/2015 psi,minimal WOB;Sidetrack time drill as per DD from 10,775'to 10,792'. 140 rpm/4.5-5 k trq,230 GPM/2015 psi,minimal WOB.Pump sweep at 10,780'with 10%increase in cuttings(back on time).;Approximately 1.50'of separation from the old hole at 10,792'MD.;POOH from 10,792'to 8366'on elevators without issue.Flushed stack at 9800'for BOP test.P/U 158 K.;M/U dart valve/TIW valve.M/U test plug&test joint.Land Out on test plug.PU wt 118 k,SO wt 110 k.Fill stack,test jt&lines.Fluid leaking by test plug.;L/D floor valves. POOH to test plug&inspect.C/O test plug seal.M/U floor valves&RIH&land out on test plug.Still leaking past.POOH&Inspect test plug seals.;Make several more attempts with fluid still leaking past test plug.POOH with test plug.Drain&flush stack.Dry run test plug good.Install new 7/8"test plug seal.RIH &land on test plug.;Fill stack&check for leaks.No fluid leaking by test plug.;Shell test good.Test BOPE with 4 1/2"test joint.250/3500 psi&chart for 5 min. Annular 250/2500 psi&chart for 5 min.Witness waived by Jim Regg of AOGCC;Wellhead pressures:20"=29 psi,13 3/8"=170 psi Fluid loss to well today:36 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:19.5 hrs. Metal recovered today: 0 lbs. Total:199 lbs. 8/26/2017 Finish testing BOPE with 4 1/2"test joint.250/3500 psi&chart for 5 min.Annular 250/2500 psi&chart for 5 min.Witness waived by Jim Regg of AOGCC. Expediting lower IBOP from slope and will;change out valve and retest before going into open hole.;Pull test plug to floor and rig down test equipment.;POOH with BHA#3 from 8366'to 4644'.;Service rig,top drive and rig equipment.;POOH from 4644'to BHA.;Work BHA#3.Rack back HWDP,Jars&NMFC.PJSM& remove sources.Plug in&download LWD data.;Trouble shoot draw works;UD BHA#3 as per Sperry.Break off bit.Bit Grade:1-1-WT-G-I-X-NO-BHA.Hole Fill Calc 35 bbls/Act 39 bbls;M/U BHA#4 as per Sperry.Up-load LWD data.Shallow hole test.PJSM&load sources.;RIH with BHA#4 and 5 stands of DP to 610';PJSM&C/O IBOP on top drive.;Wellhead pressures:20"=27 psi,13 3/8"=60 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 1.0 hrs, Total:20.5 hrs. Metal recovered today:0 lbs. Total:199 lbs. 8/27/2017 Finish changing out lower manual IBOP.C/O grabber dies and saver sub.;Test lower IBOP on chart at 250 U3500 H.Good tests.Finish securing TDS pipe handler.;RIH with BHA#4 filling pipe very 2500'to 2161'.;Continue RIH with BHA#4 filling pipe very 2500'from 2161'to 8481'. Did not see TOL at 6360'.;Circulate and condition mud at 8481'. 275 GPM/2430 psi. Trip gas 16 units from TOW.;RIH with BHA#4 from 8,481'to 10,782'.W&R&work tight hole as needed.200-250 gpm,1700-1900 psi,75-120 rpm,4-6 k trq,PU wt 160 k,SO wt 125 k,ROT wt 130 k;Two significant tight spots,had to work thru several times before clean(9,636'-9,668'&10,480'-10,566').Most tight spots correlate to coals.;Went into sidetrack with no issue without pumps&without rotation.Tagged up on 10'fill @ 10,782';W&R fill from 10,782'to TD of 10,792'with hole attempting to pack off.250 gpm,2450 psi,120 rpm,4.8-5 k trq. SPR's;Directional drill from 10,792'to 10,802'as per DD's.230 gpm,2350 psi,120 rpm,4-5 k trq,PU wt 150 k,SO wt 120 k,ROT wt 130 k,5 k WOB;Wellhead pressures:20"=27 psi,13 3/8"=55 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:20.5 hrs. Metal recovered today: 0 lbs. Total:199 lbs. • i 8/28/2017 Directional drill from 10,802'to 11,047'as per DD's. 230 gpm,2150 psi,120 rpm,4-5 k trq,PU wt 145 k,SO wt 120 k,ROT wt 130 k,5-8 k WOB;Directional drill from 11,047'to 11,193'as per DD's. 230 gpm,2200 psi,120 rpm,4-5 k trq,PU wt 149 k,SO wt 121 k,ROT wt 130 k,5-8 k WOB;Directional drill from 11,193'to 11,431'as per DD's. 220 gpm,2100 psi,120 rpm,5-6 k trq,PU wt 148 k,SO wt 120 k,ROT wt 130 k,6 k WOB;Directional drill from 11,431'to 11,627'as per DD's. 220 gpm,2100 psi,120 rpm,5-6 k trq,PU wt 149 k,SO wt 123 k,ROT wt 131 k,6 k WOB;Distance to Plan:11.47'(7.19'Low/8.93' Left);Wellhead pressures:20"=27 psi,13 3/8"=160 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:20.5 hrs. Metal recovered today: 3 lbs. Total:202 lbs. 8/29/2017 Directional drill 6"hole section from 11,627'to 11,770'as per DD's. 220 GPM,2100 PSI SP,120 RPM,5-7K TQ,UW 149K,DW 123K,RW 131K,WOB 6K,;pumped a 2OBBL weighted high viscosity sweep at 11720',sweep came back on time with no noticeable increase in cuttings.(Total footage 143',ROP 24 FPH);Directional drill 6"hole section from 11,770'to 11,866'as per DD's,230GPM,2300 PSI SPP,120 RPM,7 K TQ,PU wt 155 K,SO wt 121 K,ROT wt 133 K,8 K WOB;Hydraulic hose failure on HPU#2.10 gallon spill in containment.Circulate with 210 GPM,2000 PSI&rotate 70 RPM while C/O hose&clean hydraulic oil.;Directional drill 6"hole section from 11,866'to 12,029'as per DD's,210GPM,2050 PSI SPP,120 RPM,7 K TQ,PU wt 156 K,SO wt 122 K,ROT wt 134 K,5-10 K WOB;Directional drill 6"hole section from 12,029'to 12,213'as per DD's,215GPM,2100 PSI SPP,120 RPM,6.5-7 K TQ,PU wt 156 K,SO wt 124 K,ROT wt 132 K,5-10 K WOB;Distance to Plan:70.25'(64.31'Low/28.28'Right);Wellhead pressures:20"=27 psi,13 3/8"=105 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 1.5 hrs, Total:22 hrs. Metal recovered today: 9 lbs. Total:211 lbs. 8/30/2017 Directional drill 6"hole section from 12,213'to 12,337,per Directional Driller and Geologist,with 215 GPM,120 RPM,6-7K TQ, 2015 PSI SPP,5-8K WOB, UW 157K,DW 126K,ROT 133K;Distance to Plan:81.59'(76.74'Low/27.72'Right);Service top drive,blocks,and draw works.;Pumped a 20 BBL 9.3 PPG 300+viscosity sweep,at 250 GPM,123 RPM while reciprocating pipe.(6"OH x CDS40=389AV,95/8"40#x CSDS40=109AV) Sweep came back on time with a 10%increase in cuttings.;Short trip out of hole on elevators from 12337'to 10750'encountered tight spots 12060 14K,12045 20K,12033 30K,11002 30K,was able to work through all with no issues wiping same;Noticed that the bottom layer of drilling line on the draw works drum was mashed with several broken strands,decision made to trip out to the window to cut and slip drilling Iine.;Pull out of hole,above window on elevator to 8428',had tight spots at10143' 15K,10021'10K,9474 10K,9305'20K,9720'20K,8703 30K,worked through wiping same.;Clean&clear floor&prep to slip&cut;Cut and slip 146'of drilling line,ART uploading data to PLC.;Service rig,draw works,top drive,&traveling equipment.;Trouble shoot PLC;RIH from 8,428'to 10,830'.Tight hole from 10,490'to 10,550',work thru on elevators.Encounter tight hole @ 10,830'¬ able to work thru on elevators.;Work tight hole.POOH from 10,830'to 10,814' &M/U top drive.Attempt to W&R from 10,814'to 10,830',215 gpm,1900 psi,75 rpm,5 k trq.;Hole attempting to pack off¬ making forward progress. Attempt to work down without pumping from 10,830'to 10,847'.P/U working single¬ able to work past 10,854'.;POOH with no over pull from 10,847'to 10.814'.(UD working single.)M/U top drive&attempt to wash&ream down to 10,830'.Hole packing off.(Large coal seam 10,810'-10,875');Circ&cond hole/mud.210 gpm,1900 psi,100 rpm,4.5 k trq;Cont.to work tight hole from 10,830'.210 gpm,1850 psi,80 rpm,4.5-5 k trq.Hole continues to try and pack off.;Work pipe&try&clean up coals.Significant amount of coal cuttings&cavings across shakers.;Wellhead pressures:20"=28 psi,13 3/8"=165 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.5 hrs, Total:22.5 hrs. Metal recovered today:0.0 lbs. Total:211 lbs. 8/31/2017 Orientate Geo Pilot to same parameters as when hole section was drilled,wash and ream from 10,820'to 10845,down link and place Geo Pilot in parked mode. Continue to wash and ream from 10845 to;10960,with hole continuing to try and pack off. (Note large coal seam from 10810'to 10875')continued to work pipe down to 10960'which should of had the upper stabilizer below the bottom coal seam;at 10875'. With bit at 10960',checked ABI at 37.4 degrees, previous well bore was 41.5 degrees,indicating we had sidetracked hole.;Circulate and condition mud while contacting engineer,decision made to see if new sidetrack was accessible,and could be used for the remainder of the wellbore.;Trip out of hole on elevators from 10960'to 10661',with minimal over pulls, index pipe 180 degrees with Geo Pilot in neutral position and trip back in hole set down 15K at 10857,and worked down to;10862',make up top drive and wash and ream to 10903'with constant pack offs. Contacted town,decision made to trip out of hole and pick up cement stinger to lay a kick off plug.;Trip out of hole on elevators from 10862 on elevators to 8412'(above window),had 1 tight spot at 8790'pulled 20K over to get through.;Circulate bottoms up at 290 GPM, 2370 PSI SPP,rotating pipe 100 RPM and reciprocating same.;Trip out of hole from 8412'with 6"rotary steerable drilling assembly to BHA.Rack back HW DP, Jars&NMFC;PJSM,remove sources,download LWD data.UD BHA as per Sperry.Bit Grade:1-2-BT-N-X-I-HP;Clean&clear floor of BHA tools& equipment.;Wellhead pressures:20"=28 psi,13 3/8"=100 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:22.5 hrs. Metal recovered today:0.0 lbs. Total:211 lbs. 9/1/2017 Service rig and top drive.;Make up 3 1/2"cement stinger with defuser to 664',make up XO and change out handling equipment;Trip in the hole with cement stinger from 664'to 5005';Continue to trip in hole with cement stinger from 5005'to 8414',;C/O elevators to 3.5"to move flex collars and jars from ODS to DS of derrick. Blow thru circ hoses to verify clean.Prep pill pit for mud push;Continue to trip in hole from 8,414'to 10,835';W&R from 10,835'to 10,854'with 220 gpm,970 psi.Not able to work past 10,854'.PU wt with pumps 134 k,So with pumps 120 k;M/U 5'&15'pups for space out for KOP#1;Circ&cond for cement job 210 gpm,887 psi.Work pipe occasionally.Cont.to R/U cementers..Observed 3"victaulic gasket leaking on SLB cement unit.No spares on plafform.;Cont.to circ&cond while hot shot out spare gaskets out to platform&replace same.Finish R/U cementers.PJSM on KOP#1;Pump cement KOP#1.. SLB flood lines thru manifold to cuttings box 5bbls&pressure test lines.250 psi 5th gear stall&2500 psi high test;Rig pump 20 bbls(12 down pipe and 8 in line)12.0 ppg mud push.SLB pump 9.1 bbls 16.5 ppg cement.Rig displace with 138 bbls 9.0 ppg OBM/5 bpm,line pre-loaded with 8 BBL mud push.;Break off cement manifold&leave on rig floor.UD head pin&TIW valve.Plug appears to balanced&no issues pumping KOP#1.;POOH 5 stands(UD 5'&15' pups)to 10,525'.PIU 15'pup&RIH 1 stand to 10,597'(spaced out for KOP#2)R/U head pin,TIW valve&cement manifold.;Stage pumps to 210 gpm,1064 psi&begin to circ&cond for KOP#2;Wellhead pressures:20"=28 psi,13 3/8"=45 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:22.5 hrs. Metal recovered today:0.0 lbs. Total:211 lbs. • • 9/2/2017 Stage pump up to 220 GPM to clean well bore above lower cement kick off plug,had a couple of pressure spikes that appeared to be pack offs,we were able to pick up pipe with no additional over pull,;setting down appeared to have additional drag with pumps on. lowered pump rate and monitored pressure and was able to stage pumps back up to 210 GPM with a final circulating;pressure of 950 PSI,at bottoms up we recovered our mud push and a trace of cement.;Conduct PJSM on cement job,pressure test lines to 250-2500 PSI,pump 21 BBLS of 12 PPG mud push(13 BBL down pipe and 8 BBL in surface lines). Load wiper ball,SLB pump 22.7 BBL,of 16.5 PPG,;cement slurry,with 119 sacks of Class"G"cement with a yield of 1.07 ft3/sack,and 0.050 GPS of D047 antifoam,0.300 GPS D080 dispersant,0.250 GPS D168 fluid loss,0.060 D110 retarder,;release wiper ball and rig pump an additional 3 BBLS of mud push for a total,of 11 BBLS(8 bbl in lines+3BBL)displace with 126 BBL 9 PPG OBM,at 5 BPM rate,CIP at 10:05,calculated TOC 9947';Lay down cement head and pull out of hole from 10597'to 9715',at 20 FPM;Circulate well bore clean above cement plug at 5 BPM rate 875 PSI,at bottoms up had mud push back with no cement,continue to circulate out interface.;Trip out of hole with cement stinger assembly,from 9714 to window 8356',;Clean rig floor,move flex collars from DS to ODS of derrick,clean cellar from wet trip and cement job,clean residua(cement from shakers and possum belly.;Pump dry job.Cont.POOH from 8356'to 664'with no issues;UD 3 1/2"cement stinger assembly from 664';Clean&clear floor,function rams&flush stack,check koomey bottles,and inspect fedder clamps;M/U BHA#6,picked Geo-Pilot to re run,and found upper seals leaking.Discussing BHA plan forward options.;Work on P.M.'s.Clean around rig&clean cellar&sub base.Drift casing.Misc projects around rig while wait on Geo-Pilot to be mobilized to platform.;Wellhead pressures:20"=28 psi,13 3/8"=70 psi Fluid loss to well today:0 bbls.Total:36 bbls. Code 8 today: 0.0 hrs, Total:22.5 hrs. Metal recovered today:0 0 lbs. Total.211 lbs. 9/3/2017 Clean cellar,MP#2 kicking out when staging down SPM,electrician adjusted controls,change out agitator on pit#5,slip&cut 138'of drilling line,;begin drifting 5"liner while waiting on Geo-Pilot. Production mechanic performed maintenance on generator turbine used to power top drive.;Finish drifting 5"liner,calibrate load cells on weight indicator,change out pulsation dampener on MP#2,change out sequence valve and float control regulator on draw works and adjust same.;Geo-Pilot arrived on boat,picked up same and made up directional drilling assembly,BHA#6 to 302'(PJSM,up-load LWD data,load sources);Trip in hole with BHA#6 from 302'to 8495'with no issues,continue through window without seeing any thing,continue to trip in hole no issues to 9669';Break circulation&break in Geo-Pilot.as per DD.W&R from 9669'to 9775'.218 gpm,2150 psi,80-100 rpm, 4-4.5 k trq.Hole attempting to pack of while W&R.;Wellhead pressures:20"=28 psi,13 3/8"=45 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8 today: 0.0 hrs, Total:22.5 hrs. Metal recovered today:0.0 lbs. Total:211 lbs. 9/4/2017 Wash and ream from 9775'to 9928' had some pack off issues,at 9928 appears to be top of cement,continue to wash ream and drill cement to 10099 with 210 GPM,80-100 RPM,2100 PSI;3-5K TQ,Continuing to have some pack off issues.;Downlinked RSA,to 100%down and attempt to gain departure,maintaining less than 10 FPM rate,initially did not see the drop that we were anticipating reduced ROP to less than 5 FPH to 12130';at 120 RPM,5-5K TQ,0-3K WOB, looked like we had 1 degree of departure,DD orientated RSA to 90 left and drilled to 10145,when it appeared that we jumped back in the original well bore.;Picked back up to 10120 and resumed time drilling at less than 5 FPH ROP at 100%down to 10133'.221 GPM,1860 PSI SPP,123K RW,145 UW, 120K DW;Cont.to time drill from 10133'to 10144'@ 3 FPH,180 GPM,1350 PSI,80 RPM,4 K TRQ.(not confident we are sidetracked @ 10,144');Cont.to time drill from 10144'to 10165'@ 3 FPH 180-200 GPM,1350-1700 PSI,80-120 RPM,4-5 K TRQ.PU 145 k,SO 120 K,ROT 123 K.(;@ 10160' Surveys indicate a 1.3 degree variance in inclination 8"of separation,mud loggers are seeing 10%cement in returns. DD downlinked and put some left into directional assembly.;Continue with open hole sidetrack from 10165'to 10190'drilling WP 13.205 GPM,1550 PSI,1 -5 K WOB,110 RPM,4.5-5 K TRQ (1.1'separation @ 10,190');Wellhead pressures:20"=29 psi,13 3/8"=100 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8 today: 0.0 hrs, Total:22.5 hrs. Metal recovered today:5.5 lbs. Total:216.5 lbs. 9/5/2017 After confirming departure form original well bore,resume directional drilling 6"hole section from 10190 to 10345",at 210-180 GPM,1380-1550 PSI SPP,4-6K WOB,100-120 RPM,39 FPH AVG ROP PIG;Directional drill 6"hole from 10345'to 10378',per WP13,at 190 GPM,1500 PSI SPP,4-6K WOB,100-120 RPM,17 FPH AVG ROP PIG;At 10378'we encountered an area were it appeared that we were not getting any weight transfer to the bit,varied parameters picking up and wiping hole. While applying additional weight to bit it was;observed that the torque would fall off and flatten out. Pumped a weighted high viscosity lube sweep with some nut plug to try and clean cutting structure on bit,continued to work pipe and was able;to knock off ledge that was holding up Geo-Pilot non rotating housing,after punching through was able to continue drilling,picked up and wiped area without any issue. Sweep back on time,10% inc.;Directional drill 6"hole from 10378'to 10533',per WP13,at 190 GPM,1500 PSI SPP,4-6K WOB,100 RPM,5-7KTQ,39 FPH AVG ROP PIG. Geo-Pilot is not getting the yield required to land,currently;with bit depth at 10533'we will require 11 degree build rate,landing at 10600'and a TVD of 9832'making us 14'low. Discussed options with town and decision made to trip for a motor;Pull out of hole from 10533'to 10411'and circulate 1.5 x bottoms at 258 GPM,2300 PSI,50 RPM,4.4K TQ,while reciprocating pipe. Obtain SPR's,Flow check-static.;POOH from 10411'(PUW 150K,SOW 130K)to 8359'with no issues. No issues going through window. Flow check-static. Pump dry job.;Continue to POOH from 8359'to 302'with no issues. Actual hole fill=81.8 bbls,Calculated hole fill=68 bbls;Stand back HWDP,Jars and drill collars. Unload sources. Start downloading MWD. 9/6/2017 Down load MWD,lay down and stand back BHA,break bit and lay down same. Bit was good with 1 broken cutter on shoulder. 1-2-BT-T-X-I-WT-BHA.;Make up BHA per DD and MWD with 4 3/4"Sperry drill motor with AKO of 1.5,upload MWD,shallow test,and load sources.Directional offset(1.01/4.82x360=75.43 degrees);Trip in hole with 6"directional drilling assembly BHA#7,from 313'to 5961',filling pipe every 3000',make up tongs engaged while making a connection and would not release.;Trouble shoot make up tong hydraulics,M/U two more stands while trouble shooting to 6085'.;Continue to troubleshoot make up tong hydraulics;consult with Tesco and ART. Take off pilot valve and clean,change out directional spool valve and hydraulic valve.;Rig dry lock fittings on hydraulic lines to make up and break out cylinders to allow using brake out tong hydraulic system with make up tongs and switch efficiently.;Continue to trip in hole with 6"directional drilling assembly BHA#7from 6085'to 7821'.;Wellhead pressures:20"=31 psi,13 3/8"=20 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8 today: 13.5 hrs, Total:36 hrs. Metal recovered today: 0 lbs. Total:216.5 lbs. 9/7/2017 Run in hole with directional BHA#7 from 7821'to 10374'did not see anything going through liner top or exiting window.;Wash and ream from 10374'to 10533' at 200 GPM,1920 PSI,did not see any fill.;Directional drill from 10533'to 10605',100%slide,210 GPM, 2072 PSI SPP,160-300 PSI DIF,3-7K WOB.;Directional drill from 10605'to 10741',89%slide,210 GPM, 2072 PSI SPP,160-320 DIF PSI,3-7K WOB.;Directional drill from 10741'to 10929',43% slide;MAD Pass all slide. 210 GPM, 2114 PSI SPP,200-350 DIF PSI,5-10K WOB,100 rpm 7200 ft-lbs. Rotating ROP 100fph,sliding 40-80 fph.;Directional drill from 10929'to 11,117',59%slide;MAD Pass all slides.210 gpm,2121 psi,200-360 DIF psi;8-15K WOB;80 rpms,7300 ft-lbs.Rot ROP 80-100fph,sliding 30-60fph. ECD's 10.34 ppg.;Wellhead pressures:20"=31 psi,13 3/8"=120 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. • • 9/8/2017 Directional drill from 11117'to 11285',32%slide;MAD Pass all slides. 210 GPM,2150 PSI,200-360 DIF PSI,8-15K WOB;80 rpms,6-8K TQ.ROT ROP 80- 100FPH,Sliding 30-60fph. ECD's 10.45 PPG.;Directional drill from 11285'to 11396',0%slide. 210 GPM,2150 PSI,8K WOB;80 rpms,6-8K TQ.ROT ROP 80-100FPH. ECD's 10.45 PPG.;Directional drill from 11396'to 11524',0%slide. 215 GPM,2235 PSI,8-9K WOB;80 rpms,6-8K TQ.ROT ROP 80-100FPH. ECD's 10.54 PPG.;Directional drill from 11524'to 11674',0%slide. 230 GPM,2570 PSI,8-9K WOB;80 rpms,6-8K TQ.ROT ROP 80-100FPH. ECD's 10.61 PPG,pumped sweep at 11564'.;Directional drill from 11674'to 11913',20%slide. 230 GPM,2620 PSI,4-8K WOB;80 rpms,6-8K TQ.ROT ROP 50- 100FPH,sliding 30-50 fph. ECD's 10.59 PPG.;Pump high vis sweep and circulate hole clean;229 gpm/2646 psi.;Trip out of hole on elevators from 11913' taking surveys at 11190,11127,11065,and 10691.;Wellhead pressures:20"=31 psi,13 3/8"=110 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/9/2017 Resurvey at survey station 10691',due to inconclusive data caused by magnetic storm yesterday,MAD pass from 10669'to 10612'slug pipe and trip out of hole to 8427'inside window.;Drain stack,make up test joint,hang drill string off with test plug,flood stack and choke with water,and test gas alarms.;Prepare tools and equipment for BOP testing,clean cellar and BOP's,and shell test on 41/2"pipe against annular to 250 PSI low and 2500 PSI High.;Test ROPE 250 PSI low and 2500 PSI high on annular,and remainder of ROPE at 250 PSI low and 3500 PSI high;4-1/2"and 5"test joints. One F/P on Kill line Demco valve- rebuild and pass.;Perform accumulator draw down test,starting pressure 3100,final pressure 1550.200 PSI recovery of 20 seconds and a full recovery of 3100 PSI in 112 seconds.;The 4 bottle N2 system averaged 2337 PSI.Test witnessed by AOGCC inspector Guy Cook.;Rig down testing equipment. Pull test plug and break down subs. Blow down choke. Drain water from stack.;Cut and slip 169'of drilling line.;Rig service.;Install plates for the"U"bolt clamp that anchors the bails for link tilt.;Trip in hole with 6"directional drilling assembly BHA#7 from 8427 to 11857. Fill pipe and break circulation. Hole packing off,establish circulation at 84gpm 660 psi 32 rpms erratic torque 5-7K.;Fill pipe and break circulation. Hole packing off,establish circulation at 84gpm 660 psi 32 rpms erratic torque 5-7K,stage pumps up to 158gpm 1630 psi increase rotary to 44 rpms,pack off.;Establish circulation at 82 gpm 585 psi with 41 rpms 6200 ft-lbs staging pumps up to 205 gpm 2400 psi.;Wellhead pressures:20"=31 psi,13 3/8"=40 psi Fluid loss to well today:0 bbls.Total:88 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/10/2017 Circulate,condition,and shear mud,staging up pump rates and top drive RPM while reciprocating pipe,to mitigate pack off issues.;Directional drill from 11913' to 12061',27%slide,MAD Passing slides 213 GPM,2450 PSI SPP,215 PSI DIF,4-8K WOB;80-100 RPM,6-8K TQ.ROT ROP 30-80 FPH,sliding 30-40 FPH. ECD's 10.60 PPG.;Directional drill from 12061'to 12142',88%slide,MAD Passing slides 215 GPM,2540 PSI SPP,230 PSI DIF,4-8K WOB;80-100 RPM,6-8K TQ.ROT ROP 30-80 FPH,sliding 30-40 FPH. ECD's 10.63 PPG.;Directional drill from 12142'to 12223',39%slide,MAD Passing slides 215 GPM,2540 PSI SPP,230 PSI DIF,4-8K WOB;80-100 RPM,6-8K TQ.ROT ROP 30-80 FPH,sliding 30-40 FPH. ECD's 10.63 PPG.;Directional drill from 12223'to 12372',38%slide,MAD Passing slides 215 GPM,2520 PSI SPP,275 PSI DIF,7-10K WOB;80 RPM,6-9K TQ.ROT ROP 30-80 FPH,sliding 30- 60 FPH. ECD's 10.69 PPG.;Directional drill from 12372'to 12479',10%slide,MAD Passing slides 215 GPM,2520 PSI SPP,275 PSI DIF,7-10K WOB;80 RPM,6-9K TQ.ROT ROP 30-60 FPH,sliding 20-50 FPH. ECD's 10.68 PPG.;Directional drill from 12479'to 12538',57%slide,MAD Passing slides 215 GPM,2570 PSI SPP,250 PSI DIF,7-10K WOB;80 RPM,6-9K TQ.ROT ROP 20-50 FPH,sliding 20-50 FPH. ECD's 10.71 PPG.;Wellhead pressures:20"= 30 psi,13 3/8"=90 psi Fluid loss to well today:17 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/11/2017 Directional drill from 12538'to 12593',75%slide,MAD Passing slides 215 GPM,2570 PSI SPP,280 PSI DIF,7-14K WOB;80 RPM,6-9K TQ.ROT ROP 20- 30 FPH,Sliding 15-25 FPH. ECD's 10.76 PPG.;Directional drill from 12593'to 12656',100%slide,MAD Passing slides 229 GPM,2900 PSI SPP,300 PSI DIF,10-17K WOB;80 RPM,6-9K TQ.,Sliding 15-25 FPH. ECD's 10.81 PPG.;Directional drill from 12656'to 12739',58%slide,MAD Passing slides 223 GPM,2760 PSI SPP,200 PSI DIF,8-17K WOB;80 RPM,6-9K TQ.,ROT ROP 50-150 FPH,Sliding 40-60 FPH. ECD's 10.73 PPG.;Directional drill from 12739'to 12782',80%slide,MAD Passing slides 223 GPM,2760 PSI SPP,200 PSI DIF,8-17K WOB;80 RPM,6-9K TQ.,ROT ROP 50-100FPH,Sliding 30- 50 FPH. ECD's 10.81 PPG.;At 12782'began experiencing some pack off issues after making connection,pumped a 15 BBL 300 viscosity sweep while drilling stand from 12782'to 12742',continue to work pipe until sweep returned.;Sweep brought back 40%increase in cuttings,15 bbls late;ECD's after sweep 10.61 ppg.;Continue drilling 6"hole from 12782 to 12910';0%slide. 215 GPM,2820 PSI SPP,200-300 PSI DIF,8-17K WOB;80 RPM,6-9K TQ.,ROT ROP 20- 40FPH.ECD's 10.61 PPG.;Continue drilling 6"hole from 12,910 to 12956';0%slide. ROP 15-25fph,diminishing to 0 fph.Vary parameters from 75-100 rpms, 200-220 gpm/2852 psi with up to 400 psi DIF,but no ROP.;Pump high viscosity nut plug sweep with 4%lube and attempt to drill ahead once exit bit-no ROP.;Continue to circulate hole clean at 229 gpm/2900 psi,93rpms/6500 ft-lbs reciprocating pipe.;Wellhead pressures:20"=30 psi,13 3/8"=105 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/12/2017 Flow check well(static).;POOH with BHA#7 from 12,956'to 8436'.;Service top drive and crown.Tighten draw works clamps.Check oil in HPU's.;POOH from 8436'to 7633'.;Adjust torque tube bar,Rewrap service loops and Kelly hose.;POOH from 7633'to 313'laying down 32 joints of drill pipe.;Rack back HWDP, Jars,collars.Remove sources,download MWD. L/D remaining BHA. BHA components observed to have scarring. Bit graded 6-8-RO-A-X-2-BT-PR,with a plugged nozzle(rubber).Pics in o:.;Clean and clear rig floor.;Rig up floor and M/U BHA#8;cleanout assembly.;Trip in hole with cleanout assembly from 196'to 7640'.;Wellhead pressures:20"=30 psi,13 3/8"=25 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/13/2017 RIH with BHA#8 clean out assembly to 11,990'without issue.;Stage pump rate up due to packing off issues.Circulate hi-vis sweep around at 230 GPM/1350 psi. 15 bbls late/10%increase.Rotate and reciprocate pipe.250 units gas at bottoms up.;Spot super hi-viscosity pill at 11,990'to 11,704'.;POOH with BHA#8 from 11,990'to 5197'.;Service rig;draw works,top drive,blocks,and crown.;Continue to POOH with clean out assembly from 5,197'to 196'laying down drill pipe. L/D clean out assembly BHA.;Clean and clear rig floor. Rig up to RIH with 5"Hydril 513 Liner.;Wellhead pressures:20"=30 psi,13 3/8"=20 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. • • 9/14/2017 PJSM on running 5"casing.Pick up shoe track and check floats-good.;RIH picking up 5" 23#Hydril 513 casing to 2932'.Fill pipe as picking up and top off every 10 joints.;Continue RIH picking up 5"casing from 2932'to 5590'.;Make up Liner SLZXP liner top packer with running tools as per BOT. RIH with one stand of drill pipe.;Circulate liner volume staging pumps up to 190 gpm/295 psi.;Continue to RIH with 5"Hydril 513 liner on drill pipe to 8424'filling every 10 stands.;Slip and cut 100'drilling line while CBU 3bpm1550 psi.;Calibrate wt indicators,establish parameters.PUW 135,SOW 123,ROT@ 128K. Make up pup joints on cement head.;RIH with 5"Hydril 513 liner on drill pipe filling pipe every 10 stands to 11228'. Set down 20K at 11,228(top of stand),attempt to work through unable to;LID single for working room. Establish;circulation staging up to 3 bpm/736 psi. Work pipe and attempt to establish rotary,unable to. Work up to 50K up and 50K down,trap 8K torque and slack off 50K-free. Continue washing and reaming;5"liner down to 11,404;2bpm/600 psi,19 rpms 5-7K ft- lbs.;Wellhead pressures:20"=30 psi,13 3/8"=20 psi Fluid loss to well today:0 bbls.Total:105 bbls. @r` + R Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs �t 1r1 Metal recovered: 0 lbs.Total:216.5 lbs. 9/15/2017 Wash and ream 5"liner from 11,404' to 11,780'. 3 BPM/780 psi. 30 RPM/7 k torque.;Circulate and condition mud while rigging up cement manifold and lines.;Rig up cement head with dart loaded.;Circulate and condition mud at 3 BPM/879 psi.Rotate and reciprocate pipe.P/U 168,S/O 124.30 RPM/6.5 K torque.;Hold PJSM.Test lines at 500 L/4500 H.Pumo cement iob as Der schedule: 15 bbl/12 ppg spacer, 55 bbl/15.3 ppg Easyblock cement,5 bbl spacer. Chase with 172.1 bbl OBM. Caught pressure with 40bbl;away. Bumped plug at 1750 psi. Able to rotate at 10 RPM/7.5 K torque until 152 bbls of 173 bbls to bump until torque stall at 9.5 K.Good returns throughout job.;CIP at 1445 hours.Increased psi to 2250 psi.Set down 30K to confirm hanger set.Pressure up to 4500 psi in increments to release running tool with no good indication of release.Bleed pressure to;3500psi.Set down to confirm hanger set okay.P/U 20 K over pick up weight and work these P/U 5/0 3 times until liner weight released.Able to rotate freely and circulate.;New top of liner(5")6178.47'.Lay down cement head and 10'up.;Circulate pipe wiper at 5.5 BPM/420 psi.Saw slight trace of spacer at bottoms up.;POOH with ZXP setting tool to 4346'.;P/U cement head and break out pup joints.;Service rig:draw works,top drive,blocks and crown.;Continue to POOH with ZXP setting tool. Screw sheared on hydraulic setting tool indicated a set. L/D setting tool.;Rig up and test SLZXP Liner top packer to 2200 psi for 30 minutes-good. R/D drain stack.;Replace 4 air boots on flow box riser.;M/U 2-7/8"test joint. Set test plug attempt to test on 2-7/8"test joint. Test plug leaking,pull and reset. Test annular 250/2500 psi,UPR 250/3500psi.;Wellhead pressures:20"=3 psi,13 3/8"=35 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/16/2017 Rig down test joint and equipment.Drain stack.;Rig up Weatherford to run clean out assembly. Strap and caliper BHA.;RIH with clean out assembly picking up 2 7/8"PH-6 pipe to 1091'.;Continue RIH picking up PH-6 from 1091'to 5500'.Offloading work boat and strapping 2 7/8"and 2 3/8"tubing.;Make up crossovers and 9-5/8"casing scraper.;Continue tripping in the hole with clean out assembly to 8613'on drill pipe.;Service draw works,top drive,blocks and crown.;Continue to trip in the hole with cleanout assembly. Tag up on landing collar on depth at 11670'.;Break circulation and stage pumps up to 4 bpm 2700 psi.Circulate 1.5 x annular volume. Check annular pressure during circulation-no change.;POOH with casing scraper assembly from 11650'to 10153'.;Wellhead pressures:20"=32 psi,13 3/8"=30 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/17/2017 POOH with casing scraper assembly from 10,153'to 5552'.;Clean up rig floor due to wet trip.;RIH with casing scraper assembly from 5552' to 11,670'. Did not see TOL at 6178'.;Circulate and condition mud at 4 BPM/3050 psi.;Ship OBM from pits to beam tank. Take on 30 bbls of LVT and flush through pits and gun lines. Ship LVT to beam tanks.;Fill pits with diesel from production tank at-1.5 bpm.;Displace wellbore to diesel:pump high vis spacer followed by diesel. Ship returns to beam tank and continue taking on diesel. Stage pumps up to 3.5 bpm;FCP 1290 psi.;Rig up and POOH with casing scraper assembly to 11,557'.;Wellhead pressures:20"=32 psi,13 3/8"=30 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. 9/18/2017 POOH with casing scraper assembly from 11,557'to 5478'.Lay down 9 5/8"casing scraper and crossover.;Service top drive,draw works and crown.;Rig up Weatherford,change elevators. Lay down 9 5/8"casing scraper and crossover.;POOH laying down PH-6 work string from 5478'to surface. L/D D.C,scraper and mill.;R/D Weatherford,clean and clear rig floor.;Service top drive,draw works,crown and blocks.;Spot E-Line unit and rig up.;Note:AFE/reporting change from Drilling to Completions.;Wellhead pressures:20"=34 psi,13 3/8"=40 psi Fluid loss to well today:0 bbls.Total:105 bbls. Code 8: 0 hrs,Total:35 hrs Total Sept:12.5 hrs Metal recovered: 0 lbs.Total:216.5 lbs. • • Hilcorp Energy Company Composite Report Well Name: GPF GP 22-13RD3 Field: County/State: ,Alaska (LAT/LONG): ;vation(RKB): API#: Spud Date: Job Name: 17118270 GP 22-13RD3 Completion Contractor AFE#: AFE$: ,�ctiultp b2t�@ 9/18/2017 RIH with CBL,CCL,and GR on E-line to 10.791':set down.• Pick up with no overpull. Attempt to work through area,but continue to set down between 10,791' and 10,820'without any overpull. Work area numerous times but tools will not pass. During drilling operations inclination builds from 56°at 10,694 to 64.87° at 10,814'with doglegs of 13.22°,8.13°,and 7.05°/100'..Log with CBL and GR from 10,770'to top of liner. POOH with E-Line.,Drop GR tool and centralizer with no rollers to shorten tool. RIH with CCUCBL,set down at 10875',unable to work past. POOH with E-Line and rig down. Top of cement appears to be -8770'. 9/19/2017 Make up 2 3/8"test joint.Change upper pipe rams to 2 3/8".Test rams at 250 L/3500 H and annular at 250 02500 H. Seal ring on test plug failed twice. Annular element will need to be replaced between wells.,Stand back 3 stands of drill pipe from under test plug.Rig up to run guns and completion assembly.,RIH picking up 3 1/8"perf guns.,Rig up Weatherford.Prepare to pick up tubing completion.,RIH 2-3/8"completion as per tally to 3052'.(hA/U gauge mandrel&test to 5000 psi.Installing cannon clamps on every jt of 2-3/8"tubing).,Cont to RIH completion as per tally from 3,052'to 5,450'.(Installing cannon clamps on every jt of 2-3/8"tubing).,C/O handling equipment to 2-7/8".,Service rig&draw works.,Rig repair with HPU#1. 9/20/2017 Continue RIH picking up completion assembly from 5,450'to 8,838'. Check ROC tool every+-500'. Installing cannon clamps 1 every other jt.,Continue RIH picking up completion assembly from 8,838'to 11,551'. Check ROC tool every+-500'.Installing cannon clamps 1 every other jt.,R/U E-line&RIH to correlate to RA tag.Send logs to town&confirm space out with Engineer&Geo.POOH&R/D E-line.,POOH with tubing from 11,551'to 11,460'.M/U space out pups &1 jt tubing&RIH to 11,511'.M/U hanger&terminate lines..RIH&space out with hanger 5'off of seat to 11,564'.PU wt 68 k,SO wt 52 k.,Fill stack&fill lines.Drop RHCP plug.,R/U testing equipment.Pressure up to 3500 psi&set packer.Chart for 30 min.Bleed pressure to 2500 psi&test tubing.Chart for 30 min.Pressure test IA to 2000 psi.Chart for 30 min.R/D testing.equipment.,RIH 5'and land on hanger @ 5:30 hrs&RILDS.(18 k compression).,R/U slick line to retrieve RHCP plug. 9/21/2017 Pollard wire line RIH and retrieve packer setting rod and RHCP plug.R/D Pollard.,Set BPV.R/D Weatherford.Clean flow box.Pull mouse hole and rotary table.,Clean pollution pan.Pull flow nipple. R/D kill line manifold.Nipple down BOPE.Secure BOPE on trolley.,Remove riser from well bay.Lower actuator& tree to well bay. N/U tree&assist production with N/U flow lines.Prep rig for move.,Cont.to assist production with N/U.Cont.to prep rig for move.Install floor plates in cellar Test hanger void 500/5000 psi for 5 min.Test tree to 500/5000 psi for 10 min.Turn well over to production @ 1:30 Hrs.,Production pressure test their lines.Initiate gas lift @ 30-35 bbls/hr.Will need to lift 350-400 bbls prior to firing guns.,Open doors on BOPE for inspection.Remove annular and stage on drill deck.Remove element from annular preventer&C/O as per Weatherford rep.Cont.to prep rig for move. Install rotary table.Position jacking unit. 9/22/2017 Nipple up annular preventer on BOP stack.Prepare rig for rig move.Inspect variable and blind rams.Consolidated diesel into pit 5. Clean pits.,Prepare to skid rig while waiting to fire perforation guns on 22-13RD3.Housekeeping in all areas.Cont.with BOPE maintenance.Modify mouse hole for next well.Service rig& work on various PM's.,20:00 hrs production done lifting diesel from IA.Bleed down pressure on tubing to zero.20:45 hrs drop rod&fire guns.Production saw indication on downhole monitoring equipment that guns fired.,Downhole pressure spiked from 1500 psi to 1900 psi&leveled out at 1700 psi.Downhole temp increased from 167°to 180°.No indication on surface.Turn well back over to production for 1 hour to monitor pressures and flow back.,Remove flow lines& remaining stairs.24:00 hrs release rig from well 22-13RD3.Skid rig over well 11-24. • i Hilcorp Alaska, LLC Granite Point Granite Point Platform GP 22-13RD3 50733200950300 Sperry Drilling Definitive Survey Report 19 September, 2017 HALLIBURTON Sperry Drilling ___,„iiiiiiiiiiiiiii • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Project Granite Point Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well GP-22-13RD3,Leg3 Slot2 Well Position +N/-S 0.00 usft Northing: 2,544,551.71 usft Latitude: 60°57'29.327 N +E/-W 0.00 usft Easting: 263,405.53 usft Longitude: 151°19'52.274 W Position Uncertainty 0.00 usft Wellhead Elevation: 129.00 usft Water Depth: 75.00 usft Wellbore GP 22-13RD3 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2017 8/31/2017 16.08 73.84 55,444 Design GP 22-13RD3 u w.,,,,,, ,.......::-,,,,,a,,,,,,,,,,,,,,,-.a.,,...-...., ::a.ta: -. ,:..»°. ..- ,...,°w..,F.......... ; :a,1:+ ,, +,,, .., .r- ,. Audit Notes: 1 Version: 1.0 Phase: ACTUAL Tie On Depth: 10,064.52 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 0.00 0.00 0.00 116.48 Survey Program Date 9/18/2017 7+ From To "'''"''';',1 �t' �a> n s'a, c."'f *11. .,1. .,.'a„4 a '&:,:',, ,';!!',::.,0,,, ^. k� ,,,;.,;,,4,,,,, :-, + (usft) (usft) Survey(Wellbore) Tool Name Descriptio �, b e 4, 34.00 5,714.00 GP22-13RD GCT(1)(GP 22-13 PB1) NSG_WL North seeking gyro on wireline 12/20/1995 5,734.00 6,654.00 GP22-13RD GCT(2)(GP-22-13) NSG_WL North seeking gyro on wireline 12/20/1995 6,752.00 8,451.00 MWD(GP-22-13RD PB1) MWD Fixed:v2:standard declination 11/28/1995 8,495.00 8,579.00 MWD_Interp Azi+sag(GP 22-13RD3 PB MWD_InterpAzi+sag Fixed:v2:std dec with interpolated azimuth+sag 08/10/2017 8,641.49 10,064.52 MWD+SC+sag(GP 22-13RD3 PB1) MWD+SC+sag Fixed:v2:standard dec&axial correction+sag 08/18/2017 10,100.00 12,911.59 MWD+SC+sag(GP 22-13RD3) MWD+SC+sag Fixed:v2:standard dec&axial correction+sag 09/01/2017 4 4 j Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 0.00 0.00 0.00 0.00 -129.00 0.00 0.00 2,544,551.71 263,405.53 0.00 0.00 UNDEFINED 34.00 0.39 192.00 34.00 -95.00 -0.11 -0.02 2,544,551.60 263,405.50 1.15 0.03 NSG_WL(1) 54.00 0.40 198.00 54.00 -75.00 -0.25 -0.06 2,544,551.47 263,405.47 0.21 0.06 NSG_WL(1) 74.00 0.32 213.00 74.00 -55.00 -0.36 -0.11 2,544,551.35 263,405.41 0.61 0.06 NSG_WL(1) 94.00 0.16 219.00 94.00 -35.00 -0.43 -0.16 2,544,551.29 263,405.36 0.81 0.05 NSG_WL(1) 114.00 0.12 227.00 114.00 -15.00 -0.46 -0.19 2,544,551.25 263,405.33 0.22 0.03 NSG_WL(1) 134.00 0.11 244.00 134.00 5.00 -0.49 -0.23 2,544,551.23 263,405.30 0.18 0.02 NSG_WL(1) 154.00 0.12 266.00 154.00 25.00 -0.50 -0.26 2,544,551.22 263,405.26 0.22 -0.01 NSG_WL(1) 174.00 0.16 276.00 174.00 45.00 -0.50 -0.31 2,544,551.22 263,405.21 0.23 -0.06 NSG_WL(1) 194.00 0.23 274.00 194.00 65.00 -0.49 -0.38 2,544,551.23 263,405.14 0.35 -0.12 NSG_WL(1) 9/19/2017 1:03:17PM Page 2 COMPASS 5000.1 Build 81D • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) , Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature 0 Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 214.00 0.35 272.00 214.00 85.00 -0.48 -0.48 2,544,551.24 263,405.04 0.60 -0.21 NSG_WL(1) 234.00 0.50 268.00 234.00 105.00 -0.49 -0.63 2,544,551.24 263,404.89 0.76 -0.35 NSG_WL(1) 254.00 0.65 263.00 254.00 125.00 -0.50 -0.83 2,544,551.23 263,404.69 0.79 -0.52 NSG_WL(1) 274.00 0.71 261.00 274.00 145.00 -0.54 -1.06 2,544,551.20 263,404.46 0.32 -0.71 NSG_WL(1) 294.00 0.70 262.00 293.99 164.99 -0.57 -1.31 2,544,551.17 263,404.21 0.08 -0.92 NSG_WL(1) 314.00 0.55 266.00 313.99 184.99 -0.60 -1.52 2,544,551.15 263,404.00 0.78 -1.10 NSG_WL(1) 334.00 0.32 294.00 333.99 204.99 -0.58 -1.67 2,544,551.17 263,403.85 1.53 -1.24 NSG_WL(1) 354.00 0.53 125.00 353.99 224.99 -0.61 -1.65 2,544,551.13 263,403.87 4.23 -1.20 NSG_WL(1) 374.00 1.59 42.00 373.99 244.99 -D.46 -1.38 2,544,551.28 263,404.14 8.07 -1.04 NSG_WL(1) 394.00 3.11 49.00 393.97 264.97 0.11 -0.79 2,544,551.83 263,404.74 7.72 -0.75 NSG_WL(1) 414.00 4.96 52.00 413.92 284.92 0.99 0.30 2,544,552.70 263,405.85 9.31 -0.17 NSG_WL(1) 434.00 6.35 53.00 433.82 304.82 2.19 1.87 2,544,553.86 263,407.44 6.97 0.69 NSG_WL(1) 454.00 6.87 53.00 453.69 324.69 3.58 3.70 2,544,555.21 263,409.31 2.60 1.72 NSG_WL(1) 474.00 7.01 53.00 473.54 344.54 5.03 5.63 2,544,556.63 263,411.27 0.70 2.80 NSG_WL(1) 494.00 7.03 53.00 493.39 364.39 6.50 7.59 2,544,558.06 263,413.25 0.10 3.89 NSG_WL(1) 514.00 7.11 54.00 513.24 384.24 7.97 9.57 2,544,559.48 263,415.26 0.73 5.01 NSG_WL(1) 534.00 7.16 54.00 533.09 404.09 9.43 11.58 2,544,560.90 263,417.29 0.25 6.16 NSG_WL(1) 554.00 7.15 54.00 552.93 423.93 10.89 13.59 2,544,562.32 263,419.34 0.05 7.31 NSG_WL(1) 574.00 7.12 55.00 572.78 443.78 12.33 15.61 2,544,563.72 263,421.39 0.64 8.48 NSG_WL(1) 594.00 7.03 55.00 592.62 463.62 13.75 17.63 2,544,565.10 263,423.44 0.45 9.65 NSG_WL(1) 614.00 7.01 56.00 612.47 483.47 15.13 19.65 2,544,566.44 263,425.48 0.62 10.84 NSG_WL(1) 634.00 6.83 56.00 632.33 503.33 16.48 21.64 2,544,567.75 263,427.50 0.90 12.03 NSG_WL(1) 654.00 6.74 56.00 652.19 523.19 17.80 23.60 2,544,569.03 263,429.49 0.45 13.19 NSG_WL(1) 674.00 6.71 56.00 672.05 543.05 19.11 25.54 2,544,570.30 263,431.46 0.15 14.35 NSG_WL(1) 694.00 6.51 56.00 691.92 562.92 20.40 27.45 2,544,571.55 263,433.39 1.00 15.48 NSG_WL(1) 714.00 6.23 56.00 711.79 582.79 21.64 29.29 2,544,572.75 263,435.25 1.40 16.57 NSG_WL(1) 734.00 6.06 55.00 731.68 602.68 22.85 31.06 2,544,573.92 263,437.04 1.00 17.61 NSG_WL(1) 754.00 5.85 55.00 751.57 622.57 24.04 32.76 2,544,575.08 263,438.77 1.05 18.60 NSG_WL(1) 774.00 5.70 54.00 771.47 642.47 25.21 34.39 2,544,576.21 263,440.43 0.90 19.55 NSG_WL(1) 794.00 5.46 54.00 791.37 662.37 26.35 35.97 2,544,577.33 263,442.02 1.20 20.45 NSG_WL(1) 814.00 5.29 53.00 811.29 682.29 27.47 37.47 2,544,578.41 263,443.55 0.97 21.30 NSG_WL(1) 834.00 5.11 53.00 831.20 702.20 28.56 38.92 2,544,579.47 263,445.02 0.90 22.11 NSG_WL(1) 854.00 4.96 52.00 851.13 722.13 29.63 40.31 2,544,580.51 263,446.44 0.87 22.88 NSG_WL(1) 874.00 4.84 52.00 871.05 742.05 30.68 41.66 2,544,581.53 263,447.80 0.60 23.61 NSG_WL(1) 894.00 4.77 51.00 890.98 761.98 31.72 42.97 2,544,582.55 263,449.14 0.55 24.32 NSG_WL(1) 914.00 4.75 50.00 910.92 781.92 32.78 44.25 2,544,583.58 263,450.44 0.43 25.00 NSG_WL(1) 934.00 4.66 49.00 930.85 801.85 33.84 45.50 2,544,584.62 263,451.71 0.61 25.64 NSG_WL(1) 954.00 4.62 48.00 950.78 821.78 34.91 46.71 2,544,585.67 263,452.94 0.45 26.25 NSG_WL(1) 974.00 4.62 48.00 970.72 841.72 35.99 47.91 2,544,586.72 263,454.16 0.00 26.84 NSG_WL(1) 994.00 4.64 48.00 990.65 861.65 37.07 49.11 2,544,587.78 263,455.38 0.10 27.43 NSG_WL(1) 9/19/2017 1:03:17PM Page 3 COMPASS 5000.1 Build 81D • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +14/-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 1,014.00 4.66 48.00 1,010.59 881.59 38.16 50.31 2,544,588.84 263,456.61 0.10 28.03 NSG_WL(1) 1,034.00 4.68 48.00 1,030.52 901.52 39.25 51.52 2,544,589.90 263,457.84 0.10 28.62 NSG_WL(1) 1,054.00 4.70 49.00 1,050.45 921.45 40.33 52.75 2,544,590.96 263,459.08 0.42 29.24 NSG_WL(1) 1,074.00 4.71 49.00 1,070.39 941.39 41.40 53.99 2,544,592.01 263,460.34 0.05 29.86 NSG_WL(1) 1,094.00 4.71 50.00 1,090.32 961.32 42.47 55.23 2,544,593.05 263,461.61 0.41 30.51 NSG_WL(1) 1,114.00 4.76 50.00 1,110.25 981.25 43.53 56.50 2,544,594.09 263,462.90 0.25 31.17 NSG_WL(1) 1,134.00 4.76 50.00 1,130.18 1,001.18 44.60 57.77 2,544,595.13 263,464.19 0.00 31.83 NSG_WL(1) 1,154.00 4.78 50.00 1,150.11 1,021.11 45.67 59.04 2,544,596.17 263,465.49 0.10 32.49 NSG_WL(1) 1,174.00 4.80 50.00 1,170.04 1,041.04 46.74 60.32 2,544,597.22 263,466.79 0,10 33.16 NSG_WL(1) 1,194.00 4.80 50.00 1,189.97 1,060.97 47.82 61.61 2,544,598.27 263,468.09 0.00 33.83 NSG_WL(1) 1,214.00 4.83 50.00 1,209.90 1,080.90 48.90 62.89 2,544,599.32 263,469.40 0.15 34.50 NSG_WL(1) 1,234.00 4.85 50.00 1,229.83 1,100.83 49.98 64.18 2,544,600.38 263,470.72 0.10 35.17 NSG_WL(1) 1,254.00 4.83 50.00 1,249.76 1,120.76 51.07 65.48 2,544,601.43 263,472.03 0.10 35.84 NSG_WL(1) 1,274.00 4.84 50.00 1,269.69 1,140.69 52.15 66.77 2,544,602.49 263,473.34 0.05 36.52 NSG_WL(1) 1,294.00 4.84 50.00 1,289.62 1,160.62 53.23 68.06 2,544,603.55 263,474.66 0.00 37.19 NSG_WL(1) 1,314.00 4.87 50.00 1,309.54 1,180.54 54.32 69.36 2,544,604.61 263,475.98 0.15 37.87 NSG_WL(1) 1,334.00 4.87 50.00 1,329.47 1,200.47 55.41 70.66 2,544,605.68 263,477.30 0.00 38.54 NSG_WL(1) 1,354.00 4.86 50.00 1,349.40 1,220.40 56.50 71.96 2,544,606.74 263,478.62 0.05 39.22 NSG_WL(1) 1,374.00 4.86 51.00 1,369.33 1,240.33 57.58 73.27 2,544,607.79 263,479.95 0.42 39.91 NSG_WL(1) 1,394.00 4.87 51.00 1,389.26 1,260.26 58.65 74.58 2,544,608.83 263,481.29 0.05 40.61 NSG_WL(1) 1,414.00 4.89 51.00 1,409.18 1,280.18 59.72 75.91 2,544,609.87 263,482.63 0.10 41.32 NSG_WL(1) 1,434.00 4.89 51.00 1,429.11 1,300.11 60.79 77.23 2,544,610.92 263,483.98 0.00 42.03 NSG_WL(1) 1,454.00 4.90 51.00 1,449.04 1,320.04 61.87 78.56 2,544,611.97 263,485.33 0.05 42.74 NSG_WL(1) 1,474.00 4.89 51.00 1,468.96 1,339.96 62.94 79.88 2,544,613.01 263,486.67 0.05 43.44 NSG_WL(1) 1,494.00 4.93 51.00 .1,488.89 1,359.89 64.02 81.21 2,544,614.06 263,488.03 0.20 44.16 NSG_WL(1) 1,514.00 4.92 51.00 1,508.82 1,379.82 65.10 82.55 2,544,615.12 263,489.38 0.05 44.87 NSG_WL(1) 1,534.00 4.95 51.00 1,528.74 1,399.74 66.18 83.89 2,544,616.17 263,490.74 0.15 45.58 NSG_WL(1) 1,554.00 4.92 51.00 1,548.67 1,419.67 67.26 85.22 2,544,617.23 263,492.10 0.15 46.30 NSG_WL(1) 1,574.00 4.94 51.00 1,568.59 1,439.59 68.35 86.56 2,544,618.28 263,493.46 0.10 47.01 NSG_WL(1) 1,594.00 4.95 51.00 1,588.52 1,459.52 69.43 87.90 2,544,619.34 263,494.82 0.05 47.73 NSG_WL(1) 1,614.00 4.98 51.00 1,608.45 1,479.45 70.52 89.24 2,544,620.40 263,496.18 0.15 48.44 NSG_WL(1) 1,634.00 4.97 51.00 1,628.37 1,499.37 71.61 90.59 2,544,621.47 263,497.55 0.05 49.16 NSG_WL(1) 1,654.00 4.97 51.00 1,648.29 1,519.29 72.70 91.94 2,544,622.53 263,498.92 0.00 49.88 NSG_WL(1) 1,674.00 4.97 51.00 1,668.22 1,539.22 73.79 93.28 2,544,623.59 263,500.29 0.00 50.60 NSG_WL(1) 1,694.00 5.02 51.00 1,688.14 1,559.14 74.89 94.64 2,544,624.66 263,501.67 0.25 51.33 NSG_WL(1) 1,714.00 5.00 51.00 1,708.07 1,579.07 75.99 95.99 2,544,625.73 263,503.05 0.10 52.05 NSG_WL(1) 1,734.00 5.01 51.00 1,727.99 1,598.99 77.09 97.35 2,544,626.80 263,504.42 0.05 52.77 NSG_WL(1) 1,754.00 5.04 51.00 1,747.91 1,618.91 78.19 98.71 2,544,627.88 263,505.81 0.15 53.50 NSG_WL(1) 1,774.00 5.06 51.00 1,767.84 1,638.84 79.30 100.08 2,544,628.95 263,507.20 0.10 54.23 NSG_WL(1) 1,794.00 5.09 51.00 1,787.76 1,658.76 80.41 101.46 2,544,630.04 263,508.59 0.15 54.97 NSG_WL(1) 9/19/2017 1:03:17PM Page 4 COMPASS 5000.1 Build 81D • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name ' 1,814.0D 5.11 51.00 1,807.68 1,678.68 81.53 102.84 2,544,631.13 263,510.00 0.10 55.70 NSG WL(1) 1,834.0D 5.09 51.00 1,827.60 1,698.60 82.65 104.22 2,544,632.22 263,511.40 0.10 56.44 NSG_WL(1) 1,854.00 5.12 51.00 1,847.52 1,718.52 83.77 105.60 2,544,633.31 263,512.81 0.15 57.18 NSG_WL(1) 1,874.00 5.07 50.00 1,867.44 1,738.44 84.90 106.97 2,544,634.41 263514.20 0.51 57.90 NSG_WL(1) 1,894.00 5.11 51.00 1,887.36 1,758.36 86.03 108.34 2,544,635.51 263,515.59 0.49 58.63 NSG_WL(1) 1,914.00 5.16 51.00 1,907.28 1,778.28 87.15 109.73 2,544,636.61 263,517.01 0.25 59.37 NSG_WL(1) 1,934.00 5.15 50.00 1,927.20 1,798.20 88.29 111.12 2,544,637.73 263,518.42 0.45 60.10 NSG_WL(1) 1,954.00 5.17 50.00 1,947.12 1,818.12 89.45 112.50 2,544,638.86 263,519.82 0.10 60.82 NSG_WL(1) 1,974.00 5.24 50.00 1,967.04 1,838.04 90.62 113.89 2,544,639.99 263,521.23 0.35 61.54 NSG_WL(1) 1,994.00 5.19 50.00 1,986.96 1,857.96 91.79 115.28 2,544,641.13 263,522.65 0.25 62.27 NSG_WL(1) 2,014.00 5.22 50.00 2,006.87 1,877.87 92.95 116.67 2,544,642.27 263,524.06 0.15 62.99 NSG_WL(1) 2,034.00 5.20 50.00 2,026.79 1,897.79 94.12 118.06 2,544,643.41 263,525.47 0.10 63.72 NSG_WL(1) 2,054.00 5.26 50.00 2,046.71 1,917.71 95.29 119.46 2,544,644.55 263,526.89 0.30 64.45 NSG_WL(1) 2,074.00 5.24 50.00 2,066.62 1,937.62 96.47 120.86 2,544,645.70 263,528.32 0.10 65.18 NSG_WL(1) 2,094.00 5.27 50.00 2,086.54 1,957.54 97.65 122.26 2,544,646.85 263,529.75 0.15 65.91 NSG_WL(1) 2,114.00 5.26 49.00 2,106.45 1,977.45 98.84 123.66 2,544,648.01 263,531.17 0.46 66.63 NSG_WL(1) 2,134.00 5.29 50.00 2,126.37 1,997.37 100.03 125.06 2,544,649.18 263,532.59 0.48 67.34 NSG_WL(1) 2,154.00 5.32 50.00 2,146.28 2,017.28 101.22 126.47 2,544,650.34 263,534.03 0.15 68.08 NSG_WL(1) 2,174.00 5.32 50.00 2,166.20 2,037.20 102.41 127.89 2,544,651.50 263,535.47 0.00 68.82 NSG_WL(1) 2,194.00 5.32 49.00 2,186.11 2,057.11 103.62 129.30 2,544,652.68 263,536.91 0.46 69.55 NSG_WL(1) 2,214.00 5.35 50.00 2,206.03 2,077.03 104.82 130.72 2,544,653.85 263,538.35 0.49 70.28 NSG_WL(1) 2,234.00 5.32 50.00 2,225.94 2,096.94 106.02 132.14 2,544,655.02 263,539.79 0.15 71.02 NSG_WL(1) 2,254.00 5.30 50.00 2,245.85 2,116.85 107.21 133.56 2,544,656.16 263,541.24 0.10 71.76 NSG_WL(1) 2,274.00 5.28 50.00 2,265.77 2,136.77 108.39 134.97 2,544,657.34 263,542.67 0.10 72.49 NSG_WL(1) 2,294.00 5.31 50.00 2,285.68 2,156.68 109.58 136.39 2,544,658.49 263,544.11 0.15 73.23 NSG_WL(1) 2,314.00 5.35 50.00 2,305.60 2,176.60 110.77 137.81 2,544,659.66 263,545.56 0.20 73.97 NSG_WL(1) 2,334.00 5.36 50.00 2,325.51 2,196.51 111.97 139.24 2,544,660.83 263,547.01 0.05 74.72 NSG_WL(1) 2,354.00 5.34 50.00 2,345.42 2,216.42 113.17 140.67 2,544,662.00 263,548.46 0.10 75.46 NSG_WL(1) 2,374.00 5.35 50.00 2,365.33 2,236.33 114.37 142.09 2,544,663.17 263,549.91 0.05 76.20 NSG_WL(1) 2,394.00 5.37 50.00 2,385.25 2,256.25 115.57 143.53 2,544,664.34 263,551.37 0.10 76.95 NSG_WL(1) 2,414.00 5.39 50.00 2,405.16 2,276.16 116.78 144.96 2,544,665.51 263,552.83 0.10 77.70 NSG_WL(1) 2,434.00 5.42 50.00 2,425.07 2,296.07 117.99 146.41 2,544,666.70 263,554.30 0.15 78.45 NSG_WL(1) 2,454.00 5.45 50.00 2,444.98 2,315.98 119.21 147.86 2,544,667.88 263,555.77 0.15 79.21 NSG_WL(1) 2,474.00 5.42 50.00 2,464.89 2,335.89 120.42 149.31 2,544,669.07 263,557.25 0.15 79.96 NSG_WL(1) 2,494.00 5.42 50.00 2,484.80 2,355.80 121.64 150.75 2,544,670.26 263,558.72 0.00 80.72 NSG_WL(1) 2,514.00 5.44 50.00 2,504.71 2,375.71 122.85 152.20 2,544,671.44 263,560.19 0.10 81.47 NSG_WL(1) 2,534.00 5.47 50.00 2,524.62 2,395.62 124.08 153.66 2,544,672.64 263,561.67 0.15 82.23 NSG_WL(1) 2,554.00 5.47 50.00 2,544.53 2,415.53 125.30 155.12 2,544,673.83 263,563.16 0.00 82.99 NSG_WL(1) 2,574.00 5.45 50.00 2,564.44 2,435.44 126.52 156.58 2,544,675.02 263,564.64 0.10 83.75 NSG_WL(1) 2,594.00 5.46 50.00 2,584.35 2,455.35 127.75 158.04 2,544,676.22 263,566.12 0.05 84.51 NSG_WL(1) 9/19/2017 1:03:17PM Page 5 COMPASS 5000.1 Build 81D i Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 2,614.00 5.49 50.00 2,604.26 2,475.26 128.97 159.50 2,544,677.41 263,567.61 0.15 85.27 NSG_WL(1) 2,634.00 5.48 50.00 2,624.16 2,495.16 130.20 160,96 2,544,678.61 263,569.10 0.05 86.03 NSG_WL(1) 2,654.00 5.48 50.00 2,644.07 2,515.07 131.43 162.42 2,544,679.81 263,570.59 0.00 86.80 NSG_WL(1) 2,674.00 5.50 50.00 2,663.98 2,534.98 132.66 163.89 2,544,681.01 263,572.08 0.10 87.56 NSG_WL(1) 2,694.00 5.50 50.00 2,683.89 2,554.89 133.89 165.36 2,544,682.21 263,573.57 0.00 88.32 NSG_WL(1) 2,714.00 5.49 49.00 2,703.80 2,574.80 135.14 166.82 2,544,683.43 263,575.05 0.48 89.07 NSG_WL(1) 2,734.00 5.50 50.00 2,723.71 2,594.71 136.38 168.27 2,544,684.64 263,576.53 0.48 89.82 NSG_WL(1) 2,754.00 5.51 49.00 2,743.61 2,614.61 137.63 169.73 2,544,685.86 263,578.02 0.48 90.57 NSG_WL(1) 2,774.00 5.53 49.00 2,763.52 2,634.52 138.89 171.18 2,544,687.09 263,579.49 0.10 91.31 NSG_WL(1) 2,794.00 5.52 49.00 2,783.43 2,654.43 140.15 172.64 2,544,688.32 263,580.97 0.05 92.05 NSG_WL(1) 2,814.00 5.55 49.00 2,803.33 2,674.33 141.42 174.09 2,544,689.56 263,582.45 0.15 92.79 NSG_WL(1) 2,834.00 5.53 49.00 2,823.24 2,694.24 142.68 175.55 2,544,690.79 263,583.94 0.10 93.53 NSG_WL(1) 2,854.00 5.53 49.00 2,843.15 2,714.15 143.95 177.00 2,544,692.03 263,585.42 0.00 94.26 NSG_WL(1) 2,874.00 5.47 50.00 2,863.06 2,734.06 145.19 178.46 2,544,693.24 263,586.90 0.57 95.01 NSG_WL(1) 2,894.00 5.49 50.00 2,882.96 2,753.96 146.42 179.92 2,544,694.44 263,588.39 0.10 95.78 NSG_WL(1) 2,914.00 5.46 50.00 2,902.87 2,773.87 147.65 181.39 2,544,695.64 263,589.87 0.15 96.54 NSG_WL(1) 2,934.00 5.46 50.00 2,922.78 2,793.78 148.87 182.84 2,544,696.83 263,591.35 0.00 97.30 NSG_WL(1) 2,954.00 5.50 51.00 2,942.69 2,813.69 150.08 184.32 2,544,698.02 263,592.85 0.52 98.08 NSG_WL(1) 2,974.00 5.48 50.00 2,962.60 2,833.60 151.30 185.79 2,544,699.20 263,594.35 0.49 98.85 NSG_WL(1) 2,994.00 5.46 50.00 2,982.51 2,853.51 152.53 187.25 2,544,700.40 263,595.84 0.10 99.62 NSG_WL(1) 3,014.00 5.45 50.00 3,002.42 2,873.42 153.75 188.71 2,544,701.59 263,597.32 0.05 100.37 NSG_WL(1) 3,034.00 5.46 50.00 3,022.33 2,893.33 154.97 190.17 2,544,702.78 263,598.80 0.05 101.13 NSG_WL(1) 3,054.00 5.48 50.00 3,042.24 2,913.24 156.20 191.63 2,544,703.98 263,600.28 0.10 101.89 NSG_WL(1) 3,074.00 5.42 50.00 3,062.15 2,933.15 157.42 193.08 2,544,705.17 263,601.76 0.30 102.65 NSG_WL(1) 3,094.00 5.46 50.00 3,082.06 2,953.06 158.64 194.54 2,544,706.36 263,603.24 0.20 103.41 NSG_WL(1) 3,114.00 5.44 51.00 3,101.97 2,972.97 159.85 196.00 2,544,707.54 263,604.73 0.49 104.18 NSG_WL(1) 3,134.00 5.43 50.00 3,121.88 2,992.88 161.05 197.46 2,544,708.71 263,606.22 0.48 104.95 NSG_WL(1) 3,154.00 5.43 50.00 3,141.79 3,012.79 162.27 198.91 2,544,709.90 263,607.69 0.00 105.71 NSG_WL(1) 3,174.00 5.43 51.00 3,161.70 3,032.70 163.47 200.37 2,544,711.07 263,609.18 0.47 106.48 NSG_WL(1) 3,194.00 5.34 51.00 3,181.61 3,052.61 164.65 201.83 2,544,712.22 263,610.66 0.45 107.26 NSG_WL(1) 3,214.00 5.33 51.00 3,201.52 3,072.52 165.82 203.28 2,544,713.36 263,612.13 0.05 108.03 NSG_WL(1) 3,234.00 5.33 52.00 3,221.43 3,092.43 166.98 204.73 2,544,714.49 263,613.60 0.46 108.82 NSG_WL(1) 3,254.00 5.36 52.00 3,241.35 3,112.35 168.13 206.20 2,544,715.61 263,615.09 0.15 109.62 NSG_WL(1) 3,274.00 5.33 52.00 3,261.26 3,132.26 169.27 207.67 2,544,716.72 263,616.59 0.15 110.42 NSG_WL(1) 3,294.00 5.30 53.00 3,281.17 3,152.17 170.40 209.14 2,544,717.82 263,618.08 0.49 111.23 NSG_WL(1) 3,314.00 5.30 53.00 3,301.09 3,172.09 171.51 210.61 2,544,718.90 263,619.58 0.00 112.06 NSG_WL(1) 3,334.00 5.32 53.00 3,321.00 3,192.00 172.63 212.09 2,544,719.99 263,621.08 0.10 112.89 NSG_WL(1) 3,354.00 5.34 53.00 3,340.92 3,211.92 173.74 213.57 2,544,721.07 263,622.58 0.10 113.72 NSG_WL(1) 3,374.00 5.26 53.00 3,360.83 3,231.83 174.86 215.05 2,544,722.16 263,624.08 0.40 114.54 NSG_WL(1) 3,394.00 5.23 53.00 3,380.75 3,251.75 175.96 216.51 2,544,723.23 263,625.56 0.15 115.36 NSG_WL(1) 9/19/2017 1:03:17PM Page 6 COMPASS 5000.1 Build 81D Halliburton • S Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True "' Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 3,414.00 5.21 53.00 3,400.66 3,271.66 177.05 217.96 2,544,724.29 263,627.04 0.10 116.17 NSGWL(1) 3,434.00 5.26 53.00 3,420.58 3,291.58 178.15 219.42 2,544,725.36 263,628.52 0.25 116.98 NSG_WL(1) 3,454.00 5.24 54.00 3,440.50 3,311.50 179.24 220.89 2,544,726.42 263,630.01 0.47 117.82 NSG_WL(1) 3,474.00 5.25 54.00 3,460.41 3,331.41 180.31 222.37 2,544,727.46 263,631.51 0.05 118.66 NSG_WL(1) 3,494.00 5.24 54.00 3,480.33 3,351.33 181.39 223.85 2,544,728.51 263,633.01 0.05 119.51 NSG_WL(1) 3,514.00 5.20 54.00 3,500.25 3,371.25 182.46 225.32 2,544,729.55 263,634.50 0.20 120.35 NSG_WL(1) 3,534.00 5.16 54.00 3,520.17 3,391.17 183.52 226.78 2,544,730.58 263,635.99 0.20 121.18 NSG_WL(1) 3,554.00 5.17 54.00 3,540.08 3,411.08 184.58 228.24 2,544,731.61 263,637.46 0.05 122.01 NSG_WL(1) 3,574.00 5.16 54.00 3,560.00 3,431.00 185.63 229.70 2,544,732.63 263,638.94 0.05 122.85 NSG_WL(1) 3,594.00 5.17 54.00 3,579.92 3,450.92 186.69 231.15 2,544,733.66 263,640.42 0.05 123.68 NSG_WL(1) 3,614.00 5.18 55.00 3,599.84 3,470.84 187.74 232.62 2,544,734.68 263,641.91 0.45 124.53 NSG_WL(1) 3,634.00 5.13 55.00 3,619.76 3,490.76 188.77 234.09 2,544,735.68 263,643.40 0.25 125.38 NSG_WL(1) 3,654.00 5.13 55.00 3,639.68 3,510.68 189.80 235.56 2,544,736.68 263,644.89 0.00 126.24 NSG_WL(1) 3,674.00 5.10 55.00 3,659.60 3,530.60 190.82 237.02 2,544,737.67 263,646.37 0.15 127.09 NSG_WL(1) 3,694.00 5.07 55.00 3,679.52 3,550.52 191.84 238.47 2,544,738.66 263,647.84 0.15 127.94 NSG_WL(1) 3,714.00 5.08 55.00 3,699.44 3,570.44 192.85 239.92 2,544,739.64 263,649.31 0.05 128.78 NSG_WL(1) 3,734.00 5.04 55.00 3,719.36 3,590.36 193.86 241.36 2,544,740.62 263,650.77 0.20 129.62 NSG_WL(1) 3,754.00 4.97 55.00 3,739.29 3,610.29 194.86 242.79 2,544,741.60 263,652.22 0.35 130.46 NSG_WL(1) 3,774.00 4.96 54.00 3,759.21 3,630.21 195.87 244.20 2,544,742.57 263,653.65 0.44 131.27 NSG_WL(1) 3,794.00 4.89 54.00 3,779.14 3,650.14 196.88 245.59 2,544,743.55 263,655.06 0.35 132.06 NSG_WL(1) 3,814.00 4.89 53.00 3,799.07 3,670.07 197.89 246.96 2,544,744.54 263,656.45 0.43 132.84 NSG_WL(1) 3,834.00 4.87 53.00 3,818.99 3,689.99 198.92 248.32 2,544,745.53 263,657.83 0.10 133.60 NSG_WL(1) 3,854.00 4.86 52.00 3,838.92 3,709.92 199.95 249.67 2,544,746.54 263,659.20 0.43 134.34 NSG_WL(1) 3,874.00 4.89 52.00 3,858.85 3,729.85 200.99 251.01 2,544,747.56 263,660.56 0.15 135.07 NSG_WL(1) 3,894.00 4.69 52.00 3,878.78 3,749.78 202.04 252.35 2,544,748.58 263,661.92 0.00 135.81 NSG_WL(1) 3,914.00 4.83 52.00 3,898.70 3,769.70 203.09 253.68 2,544,749.60 263,663.28 0.30 136.54 NSG_WL(1) 3,934.00 4.78 51.00 3,918.63 3,789.63 204.13 255.00 2,544,750.61 263,664.61 0.49 137.25 NSG_WL(1) 3,954.00 4.78 51.00 3,938.57 3,809.57 205.18 256.29 2,544,751.63 263,665.93 0.00 137.94 NSG_WL(1) 3,974.00 4.72 50.00 3,958.50 3,829.50 206.23 257.57 2,544,752.66 263,667.23 0.51 138.61 NSG_WL(1) 3,994.00 4.68 50.00 3,978.43 3,849.43 207.29 258.82 2,544,753.69 263,668.50 0.20 139.27 NSG_WL(1) 4,014.00 4.63 49.00 3,998.36 3,869.36 208.34 260.06 2,544,754.72 263,669.76 0.48 139.90 NSG_WL(1) 4,034.00 4.72 47.00 4,018.30 3,889.30 209.43 261.27 2,544,755.78 263,670.99 0.93 140.50 NSG_WL(1) 4,054.00 4.82 49.00 4,038.23 3,909.23 210.54 262.51 2,544,756.87 263,672.25 0.97 141.11 NSG_WL(1) 4,074.00 4.86 49.00 4,058.16 3,929.16 211.65 263.78 2,544,757.95 263,673.54 0.20 141.76 NSG_WL(1) 4,094.00 4.85 50.00 4,078.08 3,949.08 212.75 265.07 2,544,759.03 263,674.85 0.43 142.42 NSG_WL(1) 4,114.00 4.91 52.00 4,098.01 3,969.01 213.82 266.39 2,544,760.07 263,676.20 0.90 143.12 NSG_WL(1) 4,134.00 5.00 53.00 4,117.94 3,988.94 214.87 267.76 2,544,761.09 263,677.59 0.62 143.88 NSG_WL(1) 4,154.00 5.08 55.00 4,137.86 4,008.86 215.90 269.18 2,544,762.09 263,679.03 0.97 144.69 NSG_WL(1) 4,174.00 5.08 58.00 4,157.78 4,028.78 216.88 270.66 2,544,763.04 263,680.53 1.33 145.58 NSG_WL(1) 4,194.00 4.94 60.00 4,177.70 4,048.70 217.78 272.15 2,544,763.91 263,682.04 1.12 146.52 NSG_WL(1) 9/19/2017 1:03:17PM Page 7 COMPASS 5000.1 Build 81D • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature O Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,214.00 4.66 62.00 4,197.63 4,068.63 218.59 273.62 2,544,764.69 263,683.52 1.63 147.47 NSG_WL(1) 4,234.00 4.47 67.00 4,217.57 4,088.57 219.28 275.05 2,544,765.35 263,684.97 2.20 148.45 NSG_WL(1) 4,254.00 4.39 68.00 4,237.51 4,108.51 219.87 276.48 2,544,765.91 263,686.41 0.56 149.46 NSG_WL(1) 4,274.00 4.40 69.00 4,257.45 4,128.45 220.43 277.90 2,544,766.44 263,687.84 0.39 150.49 NSG_WL(1) 4,294.00 4.38 70.00 4,277.39 4,148.39 220.97 279.34 2,544,766.95 263,689.29 0.40 151.53 NSG_WL(1) 4,314.00 4.50 71.00 4,297.33 4,168.33 221.48 280.80 2,544,767.44 263,690.76 0.71 152.61 NSG_WL(1) 4,334.00 4.44 71.00 4,317.27 4,188.27 221.99 282.27 2,544,767.92 263,692.24 0.30 153.70 NSG_WL(1) 4,354.00 4.37 71.00 4,337.21 4,208.21 222.49 283.72 2,544,768.39 263,693.70 0.35 154.78 NSG_WL(1) 4,374.00 4.36 71.00 4,357.16 4,228.16 222.99 285.16 2,544,768.85 263,695.15 0.05 155.84 NSG_WL(1) 4,394.00 4.36 71.00 4,377.10 4,248.10 223.48 286.60 2,544,769.32 263,696.60 0.00 156.91 NSG_WL(1) 4,414.00 4.36 72.00 4,397.04 4,268.04 223.97 288.04 2,544,769.77 263,698.05 0.38 157.98 NSG_WL(1) 4,434.00 4.29 72.00 4,416.98 4,287.98 224.43 289.48 2,544,770.21 263,699.50 0.35 159.06 NSG_WL(1) 4,454.00 4.37 72.00 4,436.93 4,307.93 224.90 290.91 2,544,770.65 263,700.94 0.40 160.14 NSG_WL(1) 4,474.00 4.47 72.00 4,456.87 4,327.87 225.37 292.38 2,544,771.09 263,702.42 0.50 161.24 NSG_WL(1) 4,494.00 4.43 72.00 4,476.81 4,347.81 225.85 293.85 2,544,771.54 263,703.90 0.20 162.35 NSG_WL(1) 4,514.00 4.28 72.00 4,496.75 4,367.75 226.32 295.30 2,544,771.98 263,705.36 0.75 163.43 NSG_WL(1) 4,534.00 4.33 72.00 4,516.69 4,387.69 226.79 296.73 2,544,772.42 263,706.79 0.25 164.50 NSG_WL(1) 4,554.00 4.22 72.00 4,536.64 4,407.64 227.25 298.14 2,544,772.85 263,708.22 0.55 165.56 NSG_WL(1) 4,574.00 4.15 72.00 4,556.58 4,427.58 227.70 299.53 2,544,773.27 263,709.62 0.35 166.61 NSG_WL(1) 4,594.00 4.22 71.00 4,576.53 4,447.53 228.16 300.92 2,544,773.71 263,711.01 0.51 167.64 NSG_WL(1) 4,614.00 4.19 71.00 4,596.48 4,467.48 228.64 302.30 2,544,774.15 263,712.41 0.15 168.67 NSG_WL(1) 4,634.00 4.24 72.00 4,616.42 4,487.42 229.11 303.70 2,544,774.59 263,713.81 0.44 169.71 NSG_WL(1) 4,654.00 4.14 71.00 4,636.37 4,507.37 229.57 305.08 2,544,775.03 263,715.20 0.62 170.74 NSG_WL(1) 4,674.00 4.03 70.00 4,656.32 4,527.32 230.04 306.43 2,544,775.48 263,716.56 0.66 171.73 NSG_WL(1) 4,694.00 4.07 71.00 4,676.27 4,547.27 230.52 307.76 2,544,775.92 263,717.90 0.41 172.71 NSG_WL(1) 4,714.00 4.28 71.00 4,696.21 4,567.21 230.99 309.13 2,544,776.37 263,719.28 1.05 173.73 NSG_WL(1) 4,734.00 4.29 72.00 4,716.16 4,587,16 231.46 310.55 2,544,776.81 263,720.71 0.38 174.79 NSG_WL(1) 4,754.00 4.22 72.00 4,736.10 4,607.10 231.92 311.96 2,544,777.24 263,722.13 0.35 175.85 NSG_WL(1) 4,774.00 4.03 72.00 4,756.05 4,627.05 232.37 313.33 2,544,777.66 263,723.51 0.95 176.88 NSG_WL(1) 4,794.00 3.97 71.00 4,776.00 4,647.00 232.81 314.65 2,544,778.07 263,724.84 0.46 177.86 NSG_WL(1) 4,814.00 3.96 71.00 4,795.96 4,666.96 233.26 315.96 2,544,778.50 263,726.15 0.05 178.83 NSG_WL(1) 4,834.00 4.09 69.00 4,815.91 4,686.91 233.74 317.28 2,544,778.95 263,727.48 0.96 179.80 NSG_WL(1) 4,854.00 3.97 68.00 4,835.86 4,706.86 234.26 318.59 2,544,779.44 263,728.80 0.70 180.74 NSG_WL(1) 4,874.00 3.81 69.00 4,855.81 4,726.81 234.75 319.85 2,544,779.91 263,730.07 0.87 181.65 NSG_WL(1) 4,894.00 3.83 70.00 4,875.77 4,746.77 235.22 321.10 2,544,780.35 263,731.33 0.35 182.56 NSG_WL(1) 4,914.00 3.90 70.00 4,895.72 4,766.72 235.68 322.37 2,544,780.79 263,732.61 0.35 183.49 NSG_WL(1) 4,934.00 3.87 69.00 4,915.67 4,786.67 236.16 323.63 2,544,781.24 263,733.88 0.37 184.41 NSG_WL(1) 4,954.00 3.92 68.00 4,935.63 4,806.63 236.65 324.90 2,544,781.71 263,735.16 0.42 185.32 NSG_WL(1) 4,974.00 3.87 68.00 4,955.58 4,826.58 237.16 326.16 2,544,782.19 263,736.43 0.25 186.22 NSG_WL(1) 4,994.00 3.89 68.00 4,975.54 4,846.54 237.67 327.41 2,544,782.67 263,737.69 0.10 187.12 NSG_WL(1) 9/19/2017 1:03:17PM Page 8 COMPASS 5000.1 Build 81D 410 Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB©129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB©129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°I100') (ft) Survey Tool Name 5,014.0D 3.80 69.00 4,995.49 4,866.49 238.16 328.66 2,544,783.14 263,738.95 0.56 188.01 NSG_WL(1) 5,034.00 3.80 68.00 5,015.45 4,886.45 238.65 329.89 2,544,783.60 263,740.19 0.33 188.90 NSG_WL(1) 5,054.00 3.98 67.00 5,035.40 4,906.40 239.17 331.15 2,544,784.09 263,741.46 0.96 189.79 NSG_WL(1) 5,074.00 3.95 66.00 5,055.35 4,926.35 239.72 332.42 2,544,784.62 263,742.73 0.38 190.68 NSG_WL(1) 5,094.00 3.94 66.00 5,075.31 4,946.31 240.28 333.67 2,544,785.15 263,744.00 0.05 191.56 NSG_WL(1) 5,114.00 3.95 65.00 5,095.26 4,966.26 240.85 334.92 2,544,785.70 263,745.27 0.35 192.42 NSG_WL(1) 5,134.0D 3.97 66.00 5,115.21 4,986.21 241.42 336.18 2,544,786.24 263,746.53 0.36 193.29 NSG_WL(1) 5,154.00 4.00 66.00 5,135.16 5,006.16 241.99 337.45 2,544,786.78 263,747.82 0.15 194.18 NSG_WL(1) 5,174.00 3.96 66.00 5,155.11 5,026.11 242.55 338.72 2,544,787.32 263,749.09 0.20 195.06 NSG_WL(1) 5,194.00 4.05 68.00 5,175.07 5,046.07 243.10 340.01 2,544,787.84 263,750.39 0.83 195.97 NSG_WL(1) 5,214.00 4.14 68.00 5,195.01 5,066.01 243.63 341.33 2,544,788.35 263,751.73 0.45 196.92 NSG_WL(1) 5,234.00 4.10 68.00 5,214.96 5,085.96 244.17 342.66 2,544,788.86 263,753.07 0.20 197.87 NSG_WL(1) 5,254.00 4.08 68.00 5,234.91 5,105.91 244.70 343.98 2,544,789.37 263,754.40 0.10 198.81 NSG_WL(1) 5,274.00 4.09 68.00 5,254.86 5,125.86 245.24 345.31 2,544,789.87 263,755.73 0.05 199.76 NSG_WL(1) 5,294.00 4.15 68.00 5,274.81 5,145.81 245.78 346.64 2,544,790.39 263,757.08 0.30 200.71 NSG_WL(1) 5,314.00 4.03 68.00 5,294.76 5,165.76 246.31 347.96 2,544,790.89 263,758.41 0.60 201.66 NSG_WL(1) 5,334.00 3.92 66.00 5,314.71 5,185.71 246.85 349.24 2,544,791.41 263,759.70 0.88 202.56 NSG_WL(1) 5,354.00 3.85 65.00 5,334.66 5,205.66 247.41 350.47 2,544,791.95 263,760.94 0.49 203.41 NSG_WL(1) 5,374.00 3.85 64.00 5,354.62 5,225.62 247.99 351.68 2,544,792.50 263,762.16 0.34 204.24 NSG_WL(1) 5,394.00 4.00 62.00 5,374.57 5,245.57 248.61 352.90 2,544,793.10 263,763.40 1.02 205.05 NSG_WL(1) 5,414.00 3.91 61.00 5,394.52 5,265.52 249.27 354.11 2,544,793.73 263,764.62 0.57 205.84 NSG_WL(1) 5,434.00 3.99 61.00 5,414.48 5,285.48 249.94 355.32 2,544,794.37 263,765.84 0.40 206.63 NSG_WL(1) 5,454.00 4.10 62.00 5,434.43 5,305.43 250.61 356.56 2,544,795.02 263,767.09 0.65 207.43 NSG_WL(1) 5,474.00 4.04 63.00 5,454.38 5,325.38 251.27 357.82 2,544,795.65 263,768.36 0.46 208.27 NSG_WL(1) 5,494.00 4.02 60.00 5,474.33 5,345.33 251.94 359.05 2,544,796.29 263,769.61 1.06 209.08 NSG_WL(1) 5,514.00 4.08 61.00 5,494.28 5,365.28 252.63 360.28 2,544,796.96 263,770.86 0.46 209.87 NSG_WL(1) 5,534.00 3.95 61.00 5,514.23 5,385.23 253.31 361.51 2,544,797.62 263,772.09 0.65 210.66 NSG_WL(1) 5,554.00 3.83 58.00 5,534.18 5,405.18 254.00 362.67 2,544,798.28 263,773.28 1.18 211.40 NSG_WL(1) 5,574.00 3.80 57.00 5,554.14 5,425.14 254.71 363.80 2,544,798.97 263,774.41 0.36 212.09 NSG_WL(1) 5,594.00 3.80 56.00 5,574.09 5,445.09 255.45 364.90 2,544,799.68 263,775.53 0.33 212.75 NSG_WL(1) 5,614.00 3.81 55.00 5,594.05 5,465.05 256.20 366.00 2,544,800.41 263,776.64 0.34 213.39 NSG_WL(1) 5,634.00 3.81 54.00 5,614.01 5,485.01 256.97 367.08 2,544,801.16 263,777.74 0.33 214.02 NSG_WL(1) 5,654.00 3.82 54.00 5,633.96 5,504.96 257.75 368.15 2,544,801.92 263,778.83 0.05 214.63 NSG_WL(1) 5,674.00 3.79 53.00 5,653.92 5,524.92 258.54 369.22 2,544,802.69 263,779.91 0.36 215.24 NSG_WL(1) 5,694.00 3.79 52.00 5,673.87 5,544.87 259.35 370.27 2,544,803.47 263,780.98 0.33 215.82 NSG_WL(1) 5,714.00 3.78 50.00 5,693.83 5,564.83 260.18 371.30 2,544,804.28 263,782.02 0.66 216.36 NSG_WL(1) 5,734.00 3.83 50.00 5,713.79 5,584.79 261.03 372.31 2,544,805.12 263,783.06 0.25 216.89 NSG_WL(2) 5,754.00 3.85 50.00 5,733.74 5,604.74 261.89 373.34 2,544,805.96 263,784.10 0.10 217.43 NSG_WL(2) 5,774.00 3.82 50.00 5,753.70 5,624.70 262.75 374.36 2,544,806.79 263,785.14 0.15 217.96 NSG_WL(2) 5,794.00 3.90 48.00 5,773.65 5,644.65 263.63 375.38 2,544,807.66 263,786.17 0.78 218.48 NSG_WL(2) 9/19/2017 1:03:17PM Page 9 COMPASS 5000.1 Build 81D Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi ND TVDSS +NI-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 5,814.00 4.14 48.00 5,793.60 5,664.60 264.57 376.42 2,544,808.57 263,787.23 1.20 218.99 NSG_WL(2) 5,834.00 4.49 50.00 5,813.55 5,684.55 265.56 377.56 2,544,809.54 263,788.39 1.90 219.57 NSG_WL(2) 5,854.00 5.24 54.00 5,833.47 5,704.47 266.60 378.90 2,544,810.55 263,789.75 4.11 220.30 NSG_WL(2) 5,874.00 6.39 57.00 5,853.37 5,724.37 267.74 380.57 2,544,811.66 263,791.45 5.95 221.29 NSG_WL(2) 5,894.00 7.55 59.00 5,873.22 5,744.22 269.02 382.63 2,544,812.90 263,793.53 5.92 222.56 NSG_WL(2) 5,914.0D 8.19 60.00 5,893.03 5,764.03 270.41 384.99 2,544,814.24 263,795.92 3.27 224.06 NSG_WL(2) 5,934.0D 8.35 60.00 5,912.83 5,783.83 271.85 387.48 2,544,815.63 263,798.44 0.80 225.64 NSG_WL(2) 5,954.00 8.39 61.00 5,932.61 5,803.61 273.29 390.01 2,544,817.01 263,801.00 0.75 227.27 NSG_WL(2) 5,974.00 8.41 61.00 5,952.40 5,823.40 274.70 392.57 2,544,818.37 263,803.58 0.10 228.93 NSG_WL(2) 5,994.00 8.41 61.00 5,972.18 5,843.18 276.12 395.13 2,544,819.74 263,806.17 0.00 230.59 NSG_WL(2) 6,014.00 8.52 61.00 5,991.96 5,862.96 277.55 397.70 2,544,821.11 263,808.77 0.55 232.26 NSG_WL(2) 6,034.00 8.68 61.00 6,011.74 5,882.74 279.00 400.32 2,544,822.51 263,811.42 0.80 233.95 NSG_WL(2) 6,054.00 8.67 61.00 6,031.51 5,902.51 280.46 402.96 2,544,823.92 263,814.09 0.05 235.66 NSG_WL(2) 6,074.00 8.61 62.00 6,051.28 5,922.28 281.89 405.60 2,544,825.30 263,816.75 0.81 237.38 NSG_WL(2) 6,094.00 8.55 62.00 6,071.06 5,942.06 283.29 408.23 2,544,826.64 263,819.42 0.30 239.12 NSG_WL(2) 6,114.00 8.45 62.00 6,090.84 5,961.84 284.68 410.84 2,544,827.98 263,822.05 0.50 240.84 NSG_WL(2) 6,134.00 8.34 62.00 6,110.63 5,981.63 286.05 413.42 2,544,829.30 263,824.66 0.55 242.53 NSG_WL(2) 6,154.00 8.30 62.00 6,130.42 6,001.42 287.41 415.97 2,544,830.60 263,827.24 0.20 244.21 NSG_WL(2) 6,174.00 8.16 62.00 6,150.21 6,021.21 288.76 418.50 2,544,831.90 263,829.80 0.70 245.88 NSG_WL(2) 6,194.00 8.03 62.00 6,170.01 6,041.01 290.08 420.99 2,544,833.17 263,832.31 0.65 247.51 NSG_WL(2) 6,214.00 7.99 61.00 6,189.82 6,060.82 291.41 423.44 2,544,834.45 263,834.79 0.72 249.11 NSG_WL(2) 6,234.00 7.89 61.00 6,209.62 6,080.62 292.75 425.85 2,544,835.74 263,837.23 0.50 250.68 NSG_WL(2) 6,254.00 7.64 61.00 6,229.44 6,100.44 294.06 428.22 2,544,837.00 263,839.62 1.25 252.21 NSG_WL(2) 6,274.00 7.40 60.00 6,249.27 6,120.27 295.35 430.50 2,544,838.24 263,841.92 1.37 253.68 NSG_WL(2) 6,294.00 7.38 60.00 6,269.10 6,140.10 296.63 432,72 2,544,839.48 263,844.17 0.10 255.10 NSG_WL(2) 6,314.00 7.25 60.00 6,288.94 6,159.94 297.90 434.93 2,544,840.71 263,846.41 0.65 256.50 NSG_WL(2) 6,334.00 6.94 60.00 6,308.79 6,179.79 299.14 437.07 2,544,841.90 263,848.57 1.55 257.87 NSG_WL(2) 6,354.00 6.77 58.00 6,328.64 6,199.64 300.37 439.11 2,544,843.09 263,850.64 1.47 259.15 NSG_WL(2) 6,374.00 6.78 58.00 6,348.50 6,219.50 301.62 441.12 2,544,844.30 263,852.67 0.05 260.38 NSG_WL(2) 6,394.00 6.67 58.00 6,368.37 6,239.37 302.86 443.10 2,544,845.50 263,854.68 0.55 261.61 NSG_WL(2) 6,414.00 6.49 57.00 6,388.23 6,259.23 304.09 445.03 2,544,846.69 263,856.63 1.07 262.79 NSG_WL(2) 6,434.00 6.44 56.00 6,408.11 6,279.11 305.33 446.91 2,544,847.89 263,858.54 0.62 263.92 NSG_WL(2) 6,454.00 6.32 56.00 6,427.98 6,298.98 306.58 448.76 2,544,849.10 263,860.40 0.60 265.01 NSG_WL(2) 6,474.00 6.22 56.00 6,447.86 6,318.86 307.80 450.57 2,544,850.28 263,862.24 0.50 266.09 NSG_WL(2) 6,494.00 5.95 55.00 6,467.75 6,338.75 309.00 452.31 2,544,851.45 263,864.01 1.45 267.12 NSG_WL(2) 6,514.00 5.73 54.00 6,487.65 6,358.65 310.18 453.97 2,544,852.60 263,865.69 1.21 268.07 NSG_WL(2) 6,534.00 5.69 54.00 6,507.55 6,378.55 311.35 455.58 2,544,853.73 263,867.32 0.20 268.99 NSG_WL(2) 6,554.00 5.64 53.00 6,527.45 6,398.45 312.52 457.17 2,544,854.87 263,868.93 0.55 269.89 NSG_WL(2) 6,574.00 5.47 53.00 6,547.36 6,418.36 313.69 458.71 2,544,856.01 263,870.50 0.85 270.76 NSG_WL(2) 6,594.00 5.35 52.00 6,567.27 6,438.27 314.84 460.21 2,544,857.12 263,872.02 0.76 271.58 NSG_WL(2) 9/19/2017 1:03:17PM Page 10 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 6,614.00 5.23 51.00 6,587.18 6,458.18 315.98 461.65 2,544,858.24 263,873.49 0.76 272.36 NSG_WL(2) 6,634.00 5.14 49.00 6,607.10 6,478.10 317.15 463.04 2,544,859.38 263,874.90 1.01 273.08 NSG_WL(2) 6,654.00 5.07 49.00 6,627.02 6,498.02 318.31 464.38 2,544,860.52 263,876.26 0.35 273.77 NSG_WL(2) 6,752.00 9.34 71.72 6,724.24 6,595.24 323.65 475.21 2,544,865.63 263,887.20 5.16 281.08 MWD(3) 6,846.00 12.40 75.27 6,816.55 6,687.55 328.61 492.21 2,544,870.25 263,904.30 3.33 294.09 MWD(3) 6,941.00 15.00 78.05 6,908.84 6,779.84 333.75 514.11 2,544,874.94 263,926.30 2.82 311.40 MWD(3) 7,035.00 17.09 75.81 6,999.17 6,870.17 339.66 539.40 2,544,880.33 263,951.70 2.32 331.41 MWD(3) 7,128.00 19.82 79.10 7,087.38 6,958.38 345.99 568.14 2,544,886.08 263,980.56 3.14 354.31 MWD(3) 7,221.00 22.08 82.87 7,174.23 7,045.23 351.14 600.97 2,544,890.56 264,013.49 2.83 381.40 MWD(3) 7,315.00 23.96 85.84 7,260.75 7,131.75 354.72 637.54 2,544,893.40 264,050.13 2.35 412.54 MWD(3) 7,410.00 25.90 86.14 7,346.89 7,217.89 357.52 677.49 2,544,895.38 264,090.12 2.05 447.05 MWD(3) 7,503.00 28.00 89.35 7,429.79 7,300.79 359.13 719.59 2,544,896.14 264,132.24 2.75 484.01 MWD(3) 7,598.00 30.61 91.52 7,512.63 7,383.63 358.74 766.08 2,544,894.81 264,178.71 2.97 525.80 MWD(3) 7,691.00 33.90 92.28 7,591.27 7,462.27 357.08 815.67 2,544,892.14 264,228.26 3.56 570.93 MWD(3) 7,784.00 36.62 92.30 7,667.20 7,538.20 354.94 869.31 2,544,888.90 264,281.84 2.92 619.90 MWD(3) 7,880.00 40.42 92.38 7,742.29 7,613.29 352.49 929.04 2,544,885.25 264,341.51 3.96 674.45 MWD(3) 7,975.00 42.53 93.07 7,813.47 7,684.47 349.50 991.88 2,544,880.98 264,404.27 2.27 732.04 MWD(3) 8,071.00 45.23 92.27 7,882.66 7,753.66 346.41 1,058.35 2,544,876.54 264,470.66 2.87 792.91 MWD(3) 8,166.00 48.14 92.52 7,947.82 7,818.82 343.52 1,127.40 2,544,872.24 264,539.63 3.07 856.01 MWD(3) 8,261.00 50.50 91.41 8,009.74 7,880.74 341.06 1,199.39 2,544,868.32 264,611.56 2.64 921.55 MWD(3) 8,356.00 52.75 91.13 8,068.72 7,939.72 339.41 1,273.85 2,544,865.17 264,685.96 2.38 988.93 MWD(3) 8,451.00 53.71 92.27 8,125.58 7,996.58 337.15 1,349.91 2,544,861.36 264,761.96 1.39 1,058.03 MWD(3) 8,495.00 54.19 92.54 8,151.48 8,022.48 335.66 1,385.45 2,544,859.14 264,797.47 1.20 1,090.51 MWD_InterpAzi+sag(4) 8,579.00 54.78 96.06 8,200.28 8,071.28 330.52 1,453.61 2,544,852.63 264,865.51 3.48 1,153.81 MWD_Interp Azi+sag(4) 8,641.49 51.53 98.77 8,237.76 8,108.76 324.10 1,503.19 2,544,845.20 264,914.94 6.25 1,201.05 MWD+SC+sag(5) 8,702.58 47.92 104.87 8,277.26 8,148.26 314.62 1,548.78 2,544,834.80 264,960.33 9.64 1,246.08 MWD+SC+sag(5) 8,765.67 45.07 110.87 8,320.71 8,191.71 300.65 1,592.31 2,544,819.94 265,003.56 8.24 1,291.27 MWD+SC+sag(5) 8,826.06 42.12 116.12 8,364.46 8,235.46 284.11 1,630.49 2,544,802.63 265,041.39 7.73 1,332.82 MWD+SC+sag(5) 8,889.06 40.30 119.00 8,411.85 8,282.85 264.93 1,667.28 2,544,782.71 265,077.79 4.17 1,374.31 MWD+SC+sag(5) 8,950.16 39.20 122.99 8,458.84 8,329.84 244.83 1,700.76 2,544,761.94 265,110.86 4.55 1,413.24 MWD+SC+sag(5) 9,013.48 37.37 127.26 8,508.55 8,379.55 222.29 1,732.85 2,544,738.75 265,142.48 5.08 1,452.01 MWD+SC+sag(5) 9,073.40 34.45 130.43 8,557.08 8,428.08 200.29 1,760.23 2,544,716.20 265,169.40 5.78 1,486.33 MWD+SC+sag(5) 9,134.98 32.57 135.79 6,608.43 8,479.43 177.10 1,785.06 2,544,692.51 265,193.75 5.69 1,518.89 MWD+SC+sag(5) 9,197.08 30.36 140.88 8,661.41 8,532.41 152.94 1,806.62 2,544,667.92 265,214.82 5.56 1,548.96 MWD+SC+sag(5) 9,261.88 29.71 146.20 8,717.51 8,588.51 126.89 1,825.89 2,544,641.48 265,233.55 4.23 1,577.83 MWD+SC+sag(5) 9,322.31 32.79 150.33 8,769.18 8,640.18 100.21 1,842.32 2,544,614.48 265,249.44 6.21 1,604.43 MWD+SC+sag(5) 9,383.34 32.83 153.63 8,820.47 8,691.47 71.03 1,857.85 2,544,584.99 265,264.38 2.93 1,631.34 MWD+SC+sag(5) 9,446.23 32.09 156.27 8,873.54 8,744.54 40.46 1,872.15 2,544,554.14 265,278.05 2.54 1,657.76 MWD+SC+sag(5) 9,507.48 30.43 154.64 8,925.90 8,796.90 11.55 1,885.34 2,544,524.96 265,290.65 3.04 1,682.46 MWD+SC+sag(5) 9,569.06 31.74 151.33 8,978.64 8,849.64 -16.76 1,899.79 2,544,496.37 265,304.52 3.50 1,708.02 MWD+SC+sag(5) 9/19/2017 1:03:17PM Page 11 COMPASS 5000.1 Build 8113 • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA ,Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 9,630.87 31.78 145.27 9,031.21 8,902.21 -44.41 1,916.87 2,544,468.38 265,321.04 5.16 1,735.63 MWD+SC+sag(5) 9,692.26 31.10 138.77 9,083.60 8,954.60 -69.62 1,936.54 2,544,442.77 265,340.18 5.63 1,764.48 MWD+SC+sag(5) 9,754.53 32.45 136.34 9,136.54 9,007.54 -93.81 1,958.67 2,544,418.14 265,361.82 2.99 1,795.07 MWD+SC+sag(5) 9,816.6D 32.33 138.39 9,188.95 9,059.95 -118.26 1,981.19 2,544,393.23 265,383.84 1.78 1,826.13 MWD+SC+sag(5) 9,878.68 33.37 140.57 9,241.11 9,112.11 -143.87 2,003.06 2,544,367.20 265,405.18 2.54 1,857.12 MWD+SC+sag(5) 9,941.04 33.80 144.93 9,293.06 9,164.06 -171.31 2,023.92 2,544,339.33 265,425.48 3.93 1,888.03 MWD+SC+sag(5) 10,002.79 30.85 143.54 9,345.24 9,216.24 -198.11 2,043.20 2,544,312.15 265,444.21 4.93 1,917.24 MWD+SC+sag(5) 10,064.52 29.66 138.04 9,398.57 9,269.57 -222.20 2,062.83 2,544,287.66 265,463.34 4.88 1,945.54 MWD+SC+sag(5) 10,100.00 30.62 135.98 9,429.25 9,300.25 -235.23 2,074.97 2,544,274.39 265,475.22 3.98 1,962.23 MWD+SC+sag(6) 10,125.65 30.91 135.52 9,451.29 9,322.29 -244.63 2,084.13 2,544,264.81 265,484.19 1.46 1,974.61 MWD+SC+sag(6) 10,188.80 29.38 133.36 9,505.90 9,376.90 -266.84 2,106.76 2,544,242.15 265,506.36 2.97 2,004.77 MWD+SC+sag(6) 10,249.73 31.74 131.16 9,558.37 9,429.37 -287.65 2,129.70 2,544,220.87 265,528.87 4.29 2,034.58 MWD+SC+sag(6) 10,312.12 34.59 130.70 9,610.59 9,481.59 -310.00 2,155.48 2,544,198.00 265,554.19 4.59 2,067.63 MWD+SC+sag(6) 10,374.15 36.28 130.32 9,661.13 9,532.13 -333.36 2,182.83 2,544,174.09 265,581.06 2.75 2,102.52 MWD+SC+sag(6) 10,437.31 39.04 130.29 9,711.12 9,582.12 -358.32 2,212.25 2,544,148.54 265,609.97 4,37 2,139.98 MWD+SC+sag(6) 10,503.39 40.28 127.21 9,762.00 9,633.00 -384.70 2,245.14 2,544,121.50 265,642.31 3.52 2,181.18 MWD+SC+sag(6) 10,568.40 43.69 128.33 9,810.32 9,681.32 -411.34 2,279.50 2,544,094.17 265,676.13 5.37 2,223.82 MWD+SC+sag(6) 10,627.97 47.94 133.86 9,851.84 9,722.84 -439.45 2,311.62 2,544,065.42 265,707.66 9.75 2,265.09 MWD+SC+sag(6) 10,694.38 56.29 137.31 9,892.59 9,763.59 -476.91 2,348.19 2,544,027.22 265,743.47 13.22 2,314.53 MWD+SC+sag(6) 10,755.02 61.15 138.27 9,924.07 9,795.07 -515.29 2,382.99 2,543,988.14 265,777.48 8.13 2,362.79 MWD+SC+sag(6) 10,814.44 64.87 140.45 9,951.04 9,822.04 -555.47 2,417.45 2,543,947.28 265,811.12 7.06 2,411.56 MWD+SC+sag(6) 10,877.84 65.89 138.25 9,977.45 9,848.45 -599.19 2,455.00 2,543,902.80 265,847.77 3.54 2,464.66 MWD+SC+sag(6) 10,939.91 67.10 137.06 10,002.21 9,873.21 -641.26 2,493.34 2,543,859.97 265,885.24 2.63 2,517.73 MWD+SC+sag(6) 11,002.11 67.84 133.75 10,026.04 9,897.04 -682.16 2,533.67 2,543,818.26 265,924.73 5.06 2,572.07 MWD+SC+sag(6) 11,066.82 67.45 130.33 10,050.66 9,921.66 -722.23 2,578.11 2,543,777.29 265,968.35 4.92 2,629.71 MWD+SC+sag(6) 11,127.70 66.59 128.61 10,074.43 9,945.43 -757.85 2,621.37 2,543,740.80 266,010.88 2.96 2,684.32 MWD+SC+sag(6) 11,190.71 63.94 127.01 10,100.80 9,971.80 -792.94 2,666.58 2,543,704.80 266,055.35 4.80 2,740.42 MWD+SC+sag(6) 11,252.51 63.92 127.77 10,127.96 9,998.96 -826.65 2,710.68 2,543,670.20 266,098.76 1.11 2,794.93 MWD+SC+sag(6) 11,316.11 63.85 128.28 10,155.95 10,026.95 -861.83 2,755.67 2,543,634.12 266,143.02 0.73 2,850.88 MWD+SC+sag(6) 11,376.69 64.05 129.66 10,182.56 10,053.56 -896.06 2,797.98 2,543,599.04 266,184.63 2.07 2,904.01 MWD+SC+sag(6) 11,437.89 64.47 130.37 10,209.13 10,080.13 -931.50 2,840.20 2,543,562.75 266,226.12 1.25 2,957.61 MWD+SC+sag(6) 11,499.97 64.94 130.06 10,235.66 10,106.66 -967.74 2,883.06 2,543,525.64 266,268.24 0.88 3,012.13 MWD+SC+sag(6) 11,564.44 65.37 130.46 10,262.75 10,133.75 -1,005.55 2,927.71 2,543,486.94 266,312.10 0.87 3,068.95 MWD+SC+sag(6) 11,625.50 61.01 128.91 10,290.28 10,161.28 -1,040.35 2,969.62 2,543,451.30 266,353.30 7.49 3,121.99 MWD+SC+sag(6) 11,687.50 60.84 128.04 10,320.41 10,191.41 -1,074.06 3,012.04 2,543,416.73 266,395.03 1.26 3,174.99 MWD+SC+sag(6) 11,750.57 60.72 127.68 10,351.20 10,222.20 -1,107.85 3,055.50 2,543,382.07 266,437.79 0.53 3,228.95 MWD+SC+sag(6) 11,811.67 59.30 129.62 10,381.74 10,252.74 -1,140.89 3,096.83 2,543,348.20 266,478.44 3.60 3,280.67 MWD+SC+sag(6) 11,873.58 57.92 129.95 10,413.99 10,284.99 -1,174.71 3,137.44 2,543,313.56 266,518.35 2.28 3,332.10 MWD+SC+sag(6) 11,935.83 57.48 128.31 10,447.25 10,318.25 -1,207.91 3,178.26 2,543,279.54 266,556.48 2.34 3,383.44 MWD+SC+sag(6) 11,999.46 56.51 130.56 10,481.92 10,352.92 -1,241.80 3,219.47 2,543,244.82 266,598.99 3.33 3,435.44 MWD+SC+sag(6) 9/19/2017 1:03:17PM Page 12 COMPASS 5000.1 Build 81D • • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point ND Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 Database: Sperry EDM-NORTH US+CANADA Survey 4. Map Y1 Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 12,059.57 58.20 133.18 10,514.34 10,385.34 -1,275.58 3,257.14 2,543,210.28 266,635.98 4.62 3,484.22 MWD+SC+sag(6) 12,122.31 63.71 136.30 10,544.80 10,415.80 -1,314.20 3,296.05 2,543,170.88 266,674.09 9.80 3,536.27 MWD+SC+sag(6) 12,184.02 68.65 138.49 10,569.72 10,440.72 -1,355.75 3,334.24 2,543,128.57 266,711.42 8.64 3,588.97 MWD+SC+sag(6) 12,245.83 69.63 137.45 10,591.73 10,462.73 -1,398.65 3,372.91 2,543,084.89 266,749.21 2.23 3,642.71 MWD+SC+sag(6) 12,307.39 73.99 138.71 10,610.94 10,481.94 -1,442.16 3,411.97 2,543,040.60 266,787.38 7.34 3,697.07 MWD+SC+sag(6) 12,368.91 75.33 139.54 10,627.21 10,498.21 -1,487.02 3,450.79 2,542,994.96 266,825.28 2.54 3,751.82 MWD+SC+sag(6) 12,431.89 76.93 140.17 10,642.31 10,513.31 -1,533.76 3,490.21 2,542,947.44 266,863.74 2.72 3,807.94 MWD+SC+sag(6) 12,494.40 77.43 139.70 10,656.18 10,527.18 -1,580.40 3,529.44 2,542,900.00 266,902.01 1.09 3,863.86 MWD+SC+sag(6) 12,555.68 77.30 136.91 10,669.59 10,540.59 -1,625.05 3,569.21 2,542,854.56 266,940.87 4.45 3,919.36 MWD+SC+sag(6) 12,618.02 74.25 134.81 10,684.91 10,555.91 -1,668.41 3,611.28 2,542,810.35 266,982.05 5.88 3,976.35 MWD+SC+sag(6) 12,677.61 72.89 134.26 10,701.76 10,572.76 -1,708.50 3,652.02 2,542,769.45 267,021.96 2.45 4,030.69 MWD+SC+sag(6) 12,739.50 77.43 136.81 10,717.61 10,588.61 -1,751.19 3,693.90 2,542,725.92 267,062.97 8.35 4,087.21 MWD+SC+sag(6) 12,801.01 81.94 137.82 10,728.62 10,599.62 -1,795.66 3,734.92 2,542,680.62 267,103.07 7.51 4,143.75 MWD+SC+sag(6) 12,866.27 83.69 138.09 10,736.78 10,607.78 -1,843.74 3,778.28 2,542,631.67 267,145.44 2.71 4,204.00 MWD+SC+sag(6) 12,911.59 84.56 139.17 10,741.42 10,612.42 -1,877.58 3,808.07 2,542,597.24 267,174.54 3.05 4,245.75 MWD+SC+sag(6) 12,956.00 84.56 139.17 10,745.63 10,616.63 -1,911.03 3,836.98 2,542,563.21 267,202.76 0.00 4,286.54 PROJECTED to TD °' °"....."""' 2mko1c7helI .00.lalyd@hsalliebosuroonm Michael Calkins r „ 9/20/17Checked By: Approved By: Date: 9/19/2017 1:03:17PM Page 13 COMPASS 5000.1 Build 810 • Hilcorp Energy Company S CASING&CEMENTING REPORT Lease&Well No. GPF GP 22-13RD3 Date Run 15-Sep-17 County State Alaska Supv. R Brumley/C.Montague CASING RECORD Liner#2 V TD 12,956.00 Shoe Depth: 11,797.85 PBTD: 11,800.00 No.Jts.Delivered 178 No.Jts.Run 134 No.Jts.Returned 44 Ftg.Delivered 7,341.70 Ftg.Run 5,586.46 Ftg.Returned 1,755.24 Length Measurements W/O Threads Ftg.Cut Jt. Ftg.Balance RKB RKB to BHF 53.43 RKB to CHF RKB to THF Casing(Or Liner)Detail Setting Depths Jts. Component Size Wt. Grade THD Make Length Bottom Top Shoe 5 23.2 L-80 Hydril 513 2.15 11,800.00 11,797.85 2 Casing 5 23.2 L-80 513 Hydril 84.79 11,797.85 11,713.06 Float Collar 5 23.2 L-80 Hydril 513 1.65 11,713.06 11,711.41 1 Casing 5 23.2 L-80 Hydril 513 Hydril 39.92 11,711.41 11,671.49 Landing Collar 5 18.0 L-80 Hydril 513 1.29 11,671.49 11,670.20 132 Casing 5 23.2 L-80 513 Hydril _ 5,461.75 11,670.20 6,208.45 Cross over 7 1-80 7"x5"563 Hydril 5.27 6,208.48 6,203.18 RS Nipple 7 5/8 26.0 L-80 563 BxB 2.83 6,203.18 6,200.35 SLZXP Liner top packer 8 5/8 L-80 563 PxP 21.88 6,200.35 6,178.47 Csg Wt.On Hook: 104,000 Type Float Collar: No.Hrs to Run: 25.5 Csg Wt.On Slips: Type of Shoe: Casing Crew: Weatherford Rotate Csg X Yes No Recip Csg X Yes No 50 Ft.Min. 9.4 PPG Fluid Description: OBM Liner hanger Info(Make/Model): Baker SLZXP control#105952605-02 Liner top Packer?: X Yes __No Liner hanger test pressure: Floats Held X Yes No Centralizer Placement: None CEMENTING REPORT Shoe @ 11800 FC @ 11,711.00 Top of Liner 6178 Preflush(Spacer) Type: Mud Push Density(ppg) 12 Volume pumped(BBLS) 15 Lead Slurry Type: Class G Sacks: 227 Yield: 1.36 Density(ppg) 15.3 Volume pumped(BBLS) 55 Mixing/Pumping Rate(bpm): 2.8 Tail Slurry w Type: Sacks: Yield: F Density(ppg) Volume pumped(BBLS) Mixing/Pumping Rate(bpm): rn Post Flush(Spacer) F- a' Type: Density(ppg) Rate(bpm): Volume: E Displacement: Type: OBM Density(ppg) 9.4 Rate(bpm): 4 Volume(actual/calculated): 172.1/172.1 FCP(psi): 1750 Pump used for disp: Rig Bump Plug? X Yes No Bump press 1750 Casing Rotated? X Yes _No Reciprocated? X Yes No %Returns during job 100 Cement returns to surface? Yes X No Spacer returns? _Yes X No Vol to Surf: 0 Cement In Place At: 14:45 Date: 9/15/2017 Estimated TOC: 8,770 Method Used To Determine TOC: CBL Post Job Calculations: Calculated Cmt Vol @ 0%excess: 37.2 Total Volume cmt Pumped: 55 Cmt returned to surface: 0 Calculated cement left in wellbore: 55 OH volume Calculated: 35.2 OH volume actual: Actual%Washout: www.wellez.net WellEz Information Management LLC ver_102716bf • • Hilcorp Alaska, LLC Granite Point Granite Point Platform GP 22-13RD3 PB1 50733200957200 Sperry Drilling Definitive Survey Report 19 September, 2017 A �t �fi• ■ ■ HALLIE3URTON ■ EL ■ ■ Sperry Drilling k.� iHalliburton Definitive Survey Report • Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform I MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA P. Project Granite Point Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well GP-22-13RD3,Leg3 Slot2 Well Position +N/-S 0.00 usft Northing: 2,544,551.71 usft Latitude: 60°57'29.327 N +EI-W 0.00 usft Easting: 263,405.53 usft Longitude: 151°19'52.274 W Position Uncertainty 0.00 usft Wellhead Elevation: 129.00 usft Water Depth: 75.00 usft Wellbore GP 22-13RD3 PB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) m. BGGM2016 5/11/2017 16.16 73.86 55,498 Design GP 22-13RD3 PB1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 8,451 00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 0.00 0.00 0.00 116.00 I Survey Program Date 9/18/2017 I From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 34.00 5,714.00 GP22-13RD GCT(1)(GP 22-13 PB1) NSG WL North seeking gyro on wireline 12/20/1995 5,734.00 6,654.00 GP22-13RD GCT(2)(GP-22-13) NSG_WL North seeking gyro on wireline 12/20/1995 6,752.00 8,451.00 MWD(GP-22-13RD PB1) MWD Fixed:v2:standard declination 11/28/1995 8,495.00 8,579.00 MWD_InterpAzi+sag(GP 22-13RD3 PB MWD_InterpAzi+sag Fixed:v2:std dec with interpolated azimuth+sag 08/10/2017 8,641.49 11,682.27 MWD+SC+sag(GP 22-13RD3 PB1) MVD+SC+sag Fixed:v2:standard dec&axial correction+sag 08/18/2017 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 0.00 0.00 0.00 0.00 -129.00 0.00 0.00 2,544,551.71 263,405.53 0.00 0.00 UNDEFINED 34.00 0.39 192.00 34.00 -95.00 -0.11 -0.02 2,544,551.60 263,405.50 1.15 0.03 NSG_WL(1) 54.00 0.40 198.00 54.00 -75.00 -0.25 -0.06 2,544,551.47 263,405.47 0.21 0.05 NSG_WL(1) 74.00 0.32 213.00 74.00 -55.00 -0.36 -0.11 2,544,551.35 263,405.41 0.61 0.06 NSG_WL(1) 94.00 0.16 219.00 94.00 -35.00 -0.43 -0.16 2,544,551.29 263,405.36 0.81 0.04 NSG_WL(1) 114.00 0.12 227.00 114.00 -15.00 -0.46 -0.19 2,544,551.25 263,405.33 0.22 0.03 NSG_WL(1) 134.00 0.11 244.00 134.00 5.00 -0.49 -0.23 2,544,551.23 263,405.30 0.18 0.01 NSG_WL(1) 154.00 0.12 266.00 154.00 25.00 -0.50 -0.26 2,544,551.22 263,405.26 0.22 -0.02 NSG_WL(1) 174.00 0.16 276.00 174.00 45.00 -0.50 -0.31 2,544,551.22 263,405.21 0.23 -0.06 NSG_WL(1) 194.00 0.23 274.00 194.00 65.00 -0.49 -0.38 2,544,551.23 263,405.14 0.35 -0.13 NSG_WL(1) 9/19/2017 12:50.37PM Page 2 COMPASS 5000.1 Build 81D • Halliburton Definitive Survey Report Company: HilcorpAlaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True I Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 214.00 0.35 272.00 214.00 85.00 -0.48 -0.48 2,544,551.24 263,405.04 0.60 -0.22 NSG_WL(1) 234.00 0.50 268.00 234.00 105.00 -0.49 -0.63 2,544,551.24 263,404.89 0.76 -0.35 NSG_WL(1) 254.00 0.65 263.00 254.00 ' 125.00 -0.50 -0.83 2,544,551.23 263,404.69 0.7.9 -0.52 NSG_WL(1) 274.00 0.71 261.00 274.00 145.00 -0.54 -1.06 2,544,551.20 263,404.46 0.32 -0.72 NSG_WL(1) 294.00 0.70 262.00 293.99 164.99 -0.57 -1.31 2,544,551.17 263,404.21 0.08 -0.92 NSG_WL(1) 314.00 0.55 266.00 313.99 184.99 -0.60 -1.52. 2,544,551.15 263,404.00 0.78 -1.11 NSG_WL(1) 334.00 0.32 294.00 333.99 204.99 -0.58 -1.67 2,544,551.17 263,403.85 1.53 -1.25 NSG_WL(1) 354.00 0.53 125.00 353.99 224.99 -0.61 -1.65 2,544,551.13 263,403.87 4.23 -1.21 NSG_WL(1) 374.00 1.59 42.00 373.99 244.99 -0.46 -1.38 2,544,551.28 263,404.14 8.07 -1.04 NSG_WL(1) 394.00 3.11 49.00 393.97 264.97 0.11 -0.79 2,544,551.83 263,404.74 7.72 -0.76 NSG_WL(1) 414.00 4.96 52.00 413.92 284.92 0.99 0.30 2,544,552.70 263,405.85 9.31 -0.16 NSG_WL(1) 434.00 6.35 53.00 433.82 304.82 2.19 1.87 2,544,553.86 263,407.44 6.97 0.72 NSG_WL(1) 454.00 6.87, 53.00 453.69 324.69 3.58 3.70 2,544,555.21 263,409.31 2.60 1.76 NSG_WL(1) 474.00 7.01 53.00 473.54 344.54 5.03 5.63 2,544,556.63 263,411.27 0.70 2.86 NSG_WL(1) 494.00 7.03 53.00 493.39 364.39 6.50 7.59 2,544,558.06 263,413.25 0.10 3.97 NSG_WL(1) 514.00 7.11 54.00 513.24 384.24 7.97 9.57 2,544,559.48 263,415.26 0.73 5.11 NSG_WL(1) 534.00 7.16 54.00 533.09 404.09 9.43 11.58 2,544,560.90 263,417.29 0.25 6.27 NSG_WL(1) 554.00 7.15 54.00 552.93 423.93 10.89 13.59 2,544,562.32 263,419.34 0.05 7.44 NSG_WL(1) 574.00 7.12 55.00 572.78 443.78 12.33 15.61 2,544,563.72 263,421.39 0.64 8.63 NSG_WL(1) 594.00 7.03 55.00 592.62 463.62 13.75 17.63 2,544,565.10 263,423.44 0.45 9.82 NSG_WL(1) 614.00 7.01 56.00 612.47 483.47 15.13 19.65 2,544,566.44 263,425.48 0.62 11.02 NSG_WL(1) 634.00 6.83 56.00 632.33 503.33 16.48 21.64 2,544,567.75 263,427.50 0.90 12.23 NSG_WL(1) 654.00 6.74 56.00 652.19 523.19 17.80 23.60 2,544,569.03 263,429.49 0.45 13.41 NSG_WL(1) 674.00 6.71 56.00 672.05 543.05 19.11 25.54 2,544,570.30 263,431.46 0.15 14.58 NSG_WL(1) 694.00 6.51 56.00 691.92 562.92 20.40 27.45 2,544,571.55 263,433.39 1.00 15.73 NSG_WL(1) 714.00 6.23 56.00 711.79 582.79 21.64 29.29 2,544,572.75 263,435.25 1.40 16.84 NSG_WL(1) 734.00 6.06 55.00 731.68 602.68 22.85 31.06 2,544,573.92 263,437.04 1.00 17.90 NSG_WL(1) 754.00 5.85 55.00 751.57 622.57 24.04 32.76 2,544,575.08 263,438.77 1.05 18.90 NSG_WL(1) 774.00 5.70 54.00 771.47 642.47 25.21 34.39 2,544,576.21 263,440.43 0.90 19.86 NSG_WL(1) 794.00 5.46 54.00 791.37 662.37 26.35 35.97 2,544,577.33 263,442.02 1.20 20.78 NSG_WL(1) 814.00 5.29 53.00 811.29 682.29 27.47 37.47 2,544,578.41 263,443.55 0.97 21.64 NSG_WL(1) 834.00 5.11 53.00 831.20 702.20 28.56 38.92 2,544,579.47 263,445.02 0.90 22.46 NSG_WL(1) 854.00 4.96 52.00 851.13 722.13 29.63 40.31 2,544,580.51 263,446.44 0.87 23.25 NSG_WL(1) 874.00 4.84 52.00 871.05 742.05 30.68 41.66 2,544,581.53 263,447.80 0.60 24.00 NSG_WL(1) 894.00 4.77 51.00 890.98 761.98 31.72 42.97 2,544,582.55 263,449.14 0.55 24.72 NSG_WL(1) 914.00 4.75 50.00 910.92 781.92 32.78 44.25 2,544,583.58 263,450.44 0.43 25.41 NSG_WL(1) 934.00 4.66 49.00 930.85 801.85 33.84 45.50 2,544,584.62 263,451.71 0.61 26.06 NSG_WL(1) 954.00 4.62 48.00 950.78 821.78 34.91 46.71 2,544,585.67 263,452.94 0.45 26.68 NSG_WL(1) 974.00 4.62 48.00 970.72 841.72 35.99 47.91 2,544,586.72 263,454.16 0.00 27.28 NSG_WL(1) 994.00 4.64 48.00 990.65 861.65 37.07 49.11 2,544,587.78 263,455.38 0.10 27.89 NSG_WL(1) 9/19/2017 12:50:37PM Page 3 COMPASS 5000.1 Build 81D III Halliburton • Definitive Survey Report sA. .,m,g r* :da Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) °, Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) I Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical I MD Inc Azi TVD TVDSS +N/-S +E/-W Northing '.Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) .(ft) (ft) (°/100') (ft) Survey Tool Name s 1,014.00 4.66 48.00 1,010.59 881.59 38.16 50.31 2,544,588.84 263,456.61 0.10 28.49 NSG_WL(1) 1,034.00 4.68 48.00 1,030.52 901.52 39.25 51.52 2,544,589.90 263,457.84 0.10 29.10 NSG_WL(1) 1,054.00 4.70 49.00 1,050.45 921.45 40.33 52.75 2,544,590.96 263,459.08 0.42 29.73 NSG_WL(1) 1,074.00 4.71 49.00 1,070.39 941.39 41.40 53.99 2,544,592.01 263,460.34 0.05 30.37 NSG_WL(1) 1,094.00 4.71 50.00 1,090.32 961.32 42.47 55.23 2,544,593.05 263,461.61 0.41 31.03 NSG_WL(1) 1,114.00 4.76 50.00 1,110.25 981.25 43.53 56.50 2,544,594.09 263,462.90 0.25 31.70 NSG_WL(1) 1,134.00 4.76 50.00 1,130.18 1,001.18 44.60 57.77 2,544,595.13 263,464.19 0.00 32.37 NSG_WL(1) 1,154.00 4.78 50.00 1,150.11 1,021.11 45.67 59.04 2,544,596.17 263,465.49 0.10 33.05 NSG_WL(1) 1,174.00 4.80 50.00 1,170.04 1,041.04 46.74 60.32 2,544,597.22 263,466.79 0.10 33.73 NSG_WL(1) 1,194.00 4.80 50.00 1,189.97 1,060.97 47.82 61.61 2,544,598.27 263,468.09 0.00 34.41 NSG_WL(1) 1,214.00 4.83 50.00 1,209.90 1,080.90 48.90 62.89 2,544,599.32 263,469.40 0.15 35.09 NSG_WL(1) 1,234.00 4.85 50.00 1,229.83 1,100.83 49.98 64.18 2,544,600.38 263,470.72 0.10 35.78 NSG_WL(1) 1,254.00 4.83 50.00 1,249.76 1,120.76 51.07 65.48 2,544,601.43 263,472.03 0.10 36.46 NSG_WL(1) 1,274.00 4.84 50.00 1,269.69 1,140.69 52.15 66.77 2,544,602.49 263,473.34 0.05 37.15 NSG_WL(1) 1,294.00 4.84 50.00 1,289.62 1,160.62 53.23 68.06 2,544,603.55 263,474.66 0.00 37.84 NSG_WL(1) 1,314.00 4.87 50.00 1,309.54 1,180.54 54.32 69.36 2,544,604.61 263,475.98 0.15 38.53 NSG_WL(1) 1,334.00 4.87 50.00 1,329.47 1,200.47 55.41 70.66 2,544,605.68 263,477.30 0.00 39.22 NSG_WL(1) 1,354.00 4.86 50.00 1,349.40 1,220.40 56.50 71.96 2,544,606.74 263,478.62 0.05 39.91 NSG_WL(1) 1,374.00 4.86 51.00 1,369.33 1,240.33 57.58 73.27 2,544,607.79 263,479.95 0.42 40.61 NSG_WL(1) 1,394.00 4.87 51.00 1,389.26 1,260.26 58.65 74.58 2,544,608.83 263,481.29 0.05 41.33 NSG_WL(1) 1,414.00 4.89 51.00 1,409.18 1,280.18 59.72 75.91 2,544,609.87 263,482.63 0.10 42.04 NSG_WL(1) 1,434.00 4.89 51.00 1,429.11 1,300.11 60.79 77.23 2,544,610.92 263,483.98 0.00 42.76 NSG_WL(1) 1,454.00 4.90 51.00 1,449.04 1,320.04 61.87 78.56 2,544,611.97 263,485.33 0.05 43.49 NSG_WL(1) 1,474.00 4.89 51.00 1,468.96 1,339.96 62.94 79.88 2,544,613.01 263,486.67 0.05 44.21 NSG_WL(1) 1,494.00 4.93 51.00 1,488.89 1,359.89 64.02 81.21 2,544,614.06 263,488.03 0.20 44.93 NSG_WL(1) 1,514.00 4.92 51.00 1,508.82 1,379.82 65.10 82.55 2,544,615.12 263,489.38 0.05 45.66 NSG_WL(1) 1,534.00 4.95 51.00 1,528.74 1,399.74 66.18 83.89 2,544,616.17 263,490.74 0.15 46.38 NSG_WL(1) 1,554.00 4.92 51.00 1,548.67 1,419.67 67.26 85.22 2,544,617.23 263,492.10 0.15 47.11 NSG_WL(1) 1,574.00 4.94 51.00 1,568.59 1,439.59 68.35 86.56 2,544,618.28 263,493.46 0.10 47.84 NSG_WL(1) 1,594.00 4.95 51.00 1,588.52 1,459.52 69.43 87.90 2,544,619.34 263,494.82 0.05 48.57 NSG_WL(1) 1,614.00 4.98 51.00 1,608.45 1,479.45 70.52 89.24 2,544,620.40 263,496.18 0.15 49.30 NSG_WL(1) 1,634.00 4.97 51.00 1,628.37 1,499.37 71.61 90.59 2,544,621.47 263,497.55 0.05 50.03 NSG_WL(1) 1,654.00 4.97 51.00 1,648.29 1,519.29 72.70 91.94 2,544,622.53 263,498.92 0.00 50.76 NSG_WL(1) 1,674.00 4.97 51.00 1,668.22 1,539.22 73.79 93.28 2,544,623.59 263,500.29 0.00 51.49 NSG_WL(1) 1,694.00 5.02 51.00 1,688.14 1,559.14 74.89 94.64 2,544,624.66 263,501.67 0.25 52.23 NSG_WL(1) 1,714.00 5.00 51.00 1,708.07 1,579.07 75.99 95.99 2,544,625.73 263,503.05 0.10 52.97 NSG_WL(1) 1,734.00 5.01 51.00 1,727.99 1,598.99 77.09 97.35 2,544,626.80 263,504.42 0.05 53.71 NSG_WL(1) 1,754.00 5.04 51.00 1,747.91 1,618.91 78.19 98.71 2,544,627.88 263,505.81 0.15 54.45 NSG_WL(1) 1,774.00 5.06 51.00 1,767.84 1,638.84 79.30 100.08 2,544,628.95 263,507.20 0.10 55.19 NSG_WL(1) 1,794.00 5.09 51.00 1,787.76 1,658.76 80.41 101.46 2,544,630.04 263,508.59 0.15 55.94 NSG_WL(1) , 9/19/2017 12:50:37PM Page 4 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature 1. Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) p (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 1,814.00 5.11 51.00 1,807.68 1,678.68 81.53 102.84 2,544,631.13 263,510.00 0.10 56.69 NSG_WL(1) 1,834.00 5.09 51.00 1,827.60 1,698.60 82.65 104.22 2,544,632.22 263,511.40 0.10 57.44 NSG_WL(1) 1,854.00 5.12 51.00 1,847.52 1,718.52 83.77 105.60 2,544,633.31 263,512.81 0.15 58.19 NSG_WL(1) 1,874.00 5.07 50.00 1,867.44 1,738.44 84.90 106.97 2,544,634.41 263,514.20 0.51 58.93 NSG_WL(1) 1,894.00 5.11 51.00 1,887.36 1,758.36 86.03 108.34 2,544,635.51 263,515.59 0.49 59.67 NSG_WL(1) 1,914.00 5.16 51.00 1,907.28 1,778.28 , 87.15 109.73 2,544,636.61 263,517.01 0.25 60.42 NSG_WL(1) 1,934.00 5.15 50.00 1,927.20 1,798.20 88.29 111.12 2,544,637.73 263,518.42 0.45 61.17 NSG_WL(1) 1,954.00 5.17 50.00 1,947.12 1,818.12 89.45 112.50 2,544,638.86 263,519.82 0.10 61.90 NSG_WL(1) 1,974.00 5.24 50.00 1,967.04 1,838.04 90.62 113.89 2,544,639.99 263,521.23 0.35 62.64 NSG_WL(1) 1,994.00 5.19 50.00 1,986.96 1,857.96 91.79 115.28 2,544,641.13 263,522.65 0.25 63.38 NSG_WL(1) 2,014.00 5.22 50.00 2,006.87 1,877.87 92.95 116.67 2,544,642.27 263,524.06 0.15 64.11 NSG_WL(1) 2,034.00 5.20 50.00 2,026.79 1,897.79 94.12 118.06 2,544,643.41 263,525.47 0.10 64.85 NSG_WL(1) 2,054.00 5.26 50.00 2,046.71 1,917.71 95.29 119.46 2,544,644.55 263,526.89 0.30 • 65.59 NSG_WL(1) 2,074.00 5.24 50.00 2,066.62 1,937.62 96.47 120.86 2,544,645.70 263,528.32 0.10 66.34 NSG_WL(1) 2,094.00 5.27 50.00 2,086.54 1,957.54 97.65 122.26 2,544,646.85 263,529.75 0.15 67.08 NSG_WL(1) 2,114.00 5.26 49.00 2,106.45 1,977.45 98.84 123.66 2,544,648.01 263,531.17 0.46 67.82 NSG_WL(1) 2,134.00 5.29 50.00 2,126.37 1,997.37 100.03 125.06 2,544,649.18 263,532.59 0.48 68.55 NSG_WL(1) 2,154.00 5.32 50.00 2,146.28 2,017.28 101.22 126.47 2,544,650.34 263,534.03 0.15 69.30 NSG_WL(1) 2,174.00 5.32 50.00 2,166.20 2,037.20 102.41 127.89 2,544,651.50 263,535.47 0.00 70.05 NSG_WL(1) 2,194.00 5.32 49.00 2,186.11 2,057.11 103.62 129.30 2,544,652.68 263,536.91 0.46 70.79 NSG_WL(1) 2,214.00 5.35 50.00 2,206.03 2,077.03 104.82 130.72 2,544,653.85 263,538.35 0.49 71.54 NSG_WL(1) 2,234.00 5.32 50.00 2,225.94 2,096.94 106.02 132.14 2,544,655.02 263,539.79 0.15 72.29 NSG_WL(1) 2,254.00 5.30 50.00 2,245.85 2,116.85 107.21 133.56 2,544,656.18 263,541.24 0.10 73.05 NSG_WL(1) 2,274.00 5.28 50.00 2,265.77 2,136.77 108.39 134.97 2,544,657.34 263,542.67 0.10 73.80 NSG_WL(1) 2,294.00 5.31 50.00 2,285.68 2,156.68 109.58 136.39 2,544,658.49 263,544.11 0.15 74.55 NSG_WL(1) 2,314.00 5.35 50.00 2,305.60 2,176.60 110.77 137.81 2,544,659.66 263,545.56 0.20 75.30 NSG_WL(1) 2,334.00 5.36 50.00 2,325.51 2,196.51 111.97 139.24 2,544,660.83 263,547.01 0.05 76.06 NSG_WL(1) 2,354.00 5.34 50.00 2,345.42 2,216.42 113.17 140.67 2,544,662.00 263,548.46 0.10 76.82 NSG_WL(1) 2,374.00 5.35 50.00 2,365.33 2,236.33 114.37 142.09 2,544,663.17 263,549.91 0.05 77.58 NSG_WL(1) 2,394.00 5.37 50.00 2,385.25 2,256.25 115.57 143.53 2,544,664.34 263,551.37 0.10 78.34 NSG_WL(1) 2,414.00 5.39 50.00 2,405.16 2,276.16 116.78 144.96 2,544,665.51. 263,552.83 0.10 79.10 NSG_WL(1) 2,434.00 5.42 50.00 2,425.07 2,296.07 117.99 146.41 2,544,666.70 263,554.30 0.15 79.87 NSG_WL(1) 2,454.00 5.45 50.00 2,444.98 2,315.98 119.21 147.86 2,544,667.88 263,555.77 0.15 80.64 NSG_WL(1) 2,474.00 5.42 50.00 2,464.89 2,335.89 120.42 149.31 2,544,669.07 263,557.25 0.15 81.41 NSG_WL(1) 2,494.00 5.42 50.00 2,484.80 2,355.80 121.64 150.75 2,544,670.26 263,558.72 0.00 82.18 NSG_WL(1) 2,514.00 5.44 50.00 2,504.71 2,375.71 122.85 152.20 2,544,671.44 263,560.19 0.10 82.94 NSG_WL(1) . 2,534.00 5.47 50.00 2,524.62 2,395.62 124.08 153.66 2,544,672.64 263,561.67 0.15 83.72 NSG_WL(1) 2,554.00 5.47 50.00 2,544.53 2,415.53 125.30 155.12 2,544,673.83 263,563.16 0.00 84.49 NSG_WL(1) 2,574.00 5.45 50.00 2,564.44 2,435.44 126.52 156.58 2,544,675.02 263,564.64 0.10 85.27 NSG_WL(1) 2,594.00 5.46 50.00 2,584.35 2,455.35 127.75 158.04 2,544,676.22 263,566.12 0.05 86.04 NSG_WL(1) 9/19/2017 12:50:37PM Page 5 COMPASS 5000.1 Build 81D III Halliburton III Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) s Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section - (usft) (°) (°) (usft) (usft) (usft) (usft) ,(ft) (ft) (°/100) (ft) Survey Tool Name 2,614.00 5.49 50.00 2,604.26 2,475.26 128.97 159.50 2,544,677.41 263,567.61 0.15 86.82 NSG_WL(1) 2,634.00 5.48 50.00 2,624.16 2,495.16 130.20 160.96 2,544,678.61 263,569.10 0.05 87.59 NSG_WL(1) 2,654.00 5.48 50.00 2,644.07 2,515.07 131.43 162.42 2,544,679.81 263,570.59 0.00 88.37 NSG_WL(1) 2,674.00 5.50 50.00 2,663.98 2,534.98 132.66 163.89 2,544,681.01 263,572.08 0.10 89.15 NSG_WL(1) 2,694.00 5.50 50.00 2,683.89 2,554.89 133.89 165.36 2,544,682.21 263,573.57 0.00 89.93 NSG_WL(1) 2,714.00 5.49 49.00 2,703.80 2,574.80 135.14 166.82 2,544,683.43 263,575.05 0.48 90.69 NSG_WL(1) 2,734.00 5.50 50.00 2,723.71 2,594.71 136.38 168.27 2,544,684.64 263,576.53 0.48 91.46 NSG_WL(1) 2,754.00 5.51 49.00 2,743.61 2,614.61 137.63 169.73 2,544,685.86 263,578.02 0.48 92.22 NSG_WL(1) 2,774.00 5.53 49.00 2,763.52 2,634.52 138.89 171.18 2,544,687.09 263,579.49 0.10 92.97 NSG_WL(1) 2,794.00 5.52 49.00 2,783.43 2,654.43 140.15 172.64 2,544,688.32 263,580.97 0.05 93.73 NSG_WL(1) 2,814.00 5.55 49.00 2,803.33 2,674.33 141.42 174.09 2,544,689.56 263,582.45 0.15 94.48 NSG_WL(1) 2,834.00 5.53 49.00 2,823.24 2,694.24 142.68 175.55 2,544,690.79 263,583.94 0.10 95.23 NSG_WL(1) 2,854.00 5.53 49.00 2,843.15 2,714.15 143.95 177.00 2,544,692.03 263,585.42 0.00 95.99 NSG_WL(1) 2,874.00 5.47 50.00 2,863.06 2,734.06 145.19 178.46 2,544,693.24 263,586.90 0.57 96.75 NSG_WL(1) 2,894.00 5.49 50.00 2,882.96 2,753.96 146.42 179.92 2,544,694.44 263,588.39 0.10 97.53 NSG_WL(1) 2,914.00 5.46 50.00 2,902.87 2,773.87 147.65 181.39 2,544,695.64 263,589.87 0.15 98.30 NSG_WL(1) 2,934.00 5.46 50.00 2,922.78 2,793:78 148.87 182.84 2,544,696.83 263,591.35 0.00 99.08 NSG_WL(1) 2,954.00 5.50 51.00 2,942.69 2,813.69 150.08 184.32 2,544,698.02 263,592.85 0.52 99.87 NSG_WL(1) 2,974.00 5.48 50.00 2,962.60 2,833.60 151.30 185.79 2,544,699.20 263,594.35 0.49 100.66 NSG_WL(1) 2,994.00 5.46 50.00 2,982.51 2,853.51 152.53 187.25 2,544,700.40 263,595.84 0.10 101.44 NSG_WL(1) 3,014.00 5.45 50.00 3,002.42 2,873.42 153.75 188.71 2,544,701.59 263,597.32 0.05 102.21 NSG_WL(1) 3,034.00 5.46 50.00 3,022.33 2,893.33 154.97 190.17 2,544,702.78 263,598.80 0.05 102.99 NSG_WL(1) 3,054.00 5.48 50.00 3,042.24 2,913.24 156.20 191.63 2,544,703.98 263,600.28 0.10 103.76 NSG_WL(1) 3,074.00 5.42 50.00 3,062.15 2,933.15 157.42 193.08 2,544,705.17 263,601.76 0.30 104.53 NSG_WL(1) 3,094.00 5.46 50.00 3,082.06 2,953.06 158.64 194.54 2,544,706.36 263,603.24 0.20 105.31 NSG_WL(1) 3,114.00 5.44 51.00 3,101.97 2,972.97 159.85 196.00 2,544,707.54 263,604.73 0.49 106.09 NSG_WL(1) 3,134.00 5.43 50.00 3,121.88 2,992.88 161.05 197.46 2,544,708.71 263,606.22 0.48 106.88 NSG_WL(1) 3,154.00 5.43 50.00 3,141.79 3,012.79 162.27 198.91 2,544,709.90 263,607.69 0.00 107.65 NSG_WL(1) I 3,174.00 5.43 51.00 3,161.70 3,032.70 163.47 200.37 2,544,711.07 263,609.18 0.47 108.43 NSG_WL(1) 3,194.00 5.34 51.00 3,181.61 3,052.61 164.65 201.83 2,544,712.22 263,610.66 0.45 109.23 NSG_WL(1) 3,214.00 5.33 51.00 3,201.52 3,072.52 165.82 203.28 2,544,713.36 263,612.13 0.05 110.01 NSG_WL(1) 3,234.00 5.33 52.00 3,221.43 3,092.43 166.98 204.73 2,544,714.49 263,613.60 0.46 110.81 NSG_WL(1) 3,254.00 5.36 52.00 3,241.35 3,112.35 168.13 206.20 2,544,715.61 263,615.09 0.15 111.63 NSG_WL(1) 3,274.00 5.33 52.00 3,261.26 3,132.26 169.27 207.67 2,544,716.72 263,616.59 0.15 112.45 NSG_WL(1) 3,294.00 5.30 53.00 3,281.17 3,152.17 170.40 209.14 2,544,717.82 263,618.08 0.49 113.27 NSG_WL(1) 3,314.00 5.30 53.00 3,301.09 3,172.09 171.51 210.61 2,544,718.90 263,619.58 0.00 114.11 NSG_WL(1) 3,334.00 5.32 53.00 3,321.00 3,192.00 172.63 212.09 2,544,719.99 263,621.08 0.10 114.95 NSG_WL(1) 3,354.00 5.34 53.00 3,340.92 3,211.92 173.74 213.57 2,544,721.07 263,622.58 0.10 115.79 NSG_WL(1) 3,374.00 5.26 53.00 3,360.83 3,231.83 174.86 215.05 2,544,722.16 263,624.08 0.40 116.63 NSG_WL(1) 3,394.00 5.23 53.00 3,380.75 3,251.75 175.96 216.51 2,544,723.23 263,625.56 0.15 117.46 NSG_WL(1) 9/192017 12:50:37PM Page 6 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference; Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: ,. .. n'1 w GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA 1 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) .. (usft) (usft) (ft) (ft) (01100') (ft) Survey Tool Name 3,414.00 5.21 53.00 3,400.66 3,271.66 177.05 217.96 2,544,724.29 263,627.04 0.10 118.29 NSG_WL(1) 3,434.00 5.26 53.00 3,420.58 3,291.58 178.15 219.42 2,544,725.36 263,628.52 0.25 119.12 NSG_WL(1) 3,454.00 5.24 54.00 3,440.50 3,311.50 179.24 220.89 2,544,726.42 263,630.01 0.47 119.96 NSG WL(1) 3,474.00 5.25 54.00 3,460.41 3,331.41 180.31 222.37 2,544,727.46 263,631.51 0.05 120.82 NSG_WL(1) 3,494.00 5.24 54.00 3,480.33 3,351.33 181.39 223.85 2,544,728.51 263,633.01 0.05 121.68 NSG_WL(1) 3,514.00 5.20 54.00 3,500.25 3,371.25 182.46 225.32 2,544,729.55 263,634.50 0.20 122.53 NSG_WL(1) 3,534.00 5.16 54.00 3,520.17 3,391.17 183.52 226.78 2,544,730.58 263,635.99 0.20 123.38 NSG_WL(1) 3,554.00 5.17 54.00 3,540.08 3,411.08 184.58 228.24 2,544,731.61 263,637.46 0.05 124.23 NSG_WL(1) 3,574.00 5.16 54.00 3,560.00 3,431.00 185.63 229.70 2,544,732.63 263,638.94 0.05 125.07 NSG_WL(1) 3,594.00 5.17 54.00 3,579.92 3,450.92 186.69 231.15 2,544,733.66 263,640.42 0.05 125.92 NSG_WL(1) 3,614.00 5.18 55.00 3,599.84 3,470.84 187.74 232.62 2,544,734.68 263,641.91 0.45 126.78 NSG_WL(1) 3,634.00 5.13 55.00 3,619.76 3,490.76 188.77 234.09 2,544,735.68 263,643.40 0.25 127.65 NSG_WL(1) 3,654.00 5.13 55.00 3,639.68 3,510.68 189.80 235.56 2,544,736.68 263,644.89 0.00 128.52 NSG_WL(1) 3,674.00 5.10 55.00 3,659.60 3,530.60 190.82 237.02 2,544,737.67 263,646.37 0.15 129.38 NSG_WL(1) 3,694.00 5.07 55.00 3,679.52 3,550.52 191.84 238.47 2,544,738.66 263,647.84 0.15 130.24 NSG_WL(1) 3,714.00 5.08 55.00 3,699.44 3,570.44 192.85 239.92 2,544,739.64 263,649.31 0.05 131.10 NSG_WL(1) 3,734.00 5.04 55.00 3,719.36 3,590.36 193.86 241.36 2,544,740.62 263,650.77 0.20 131.95 NSG_WL(1) 3,754.00 4.97 55.00 3,739.29 3,610.29 194.86 242.79 2,544,741.60 263,652.22 0.35 132.80 NSG WL(1) 3,774.00 4.96 54.00 3,759.21 3,630.21 195.87 244.20 2,544,742.57 263,653.65 0.44 133.62 NSG_WL(1) 3,794.00 4.89 54.00 3,779.14 3,650.14 196.88 245.59 2,544,743.55 263,655.06 0.35 134.43 NSG_WL(1) 3,814.00 4.89 53.00 3,799.07 3,670.07 197.89 246.96 2,544,744.54 263,656.45 0.43 135.22 NSG_WL(1) 3,834.00 4.87 53.00 3,818.99 3,689.99 198.92 248.32 2,544,745.53 263,657.83 0.10 135.99 NSG_WL(1) 3,854.00 4.86 52.00 3,838.92 3,709.92 199.95 249.67 2,544,746.54 263,659.20 0.43 136.75 NSG_WL(1) 3,874.00 4.89 52.00 3,858.85 3,729.85 200.99 251.01 2,544,747.56 263,660.56 0.15 137.49 NSG_WL(1) 3,894.00 4.89 52.00 3,878.78 3,749.78 202.04 252.35 2,544,748.58 263,661.92 0.00 138.24 NSG_WL(1) 3,914.00 4.83 52.00 3,898.70 3,769.70 203.09 253.68 2,544,749.60 263,663.28 0.30 138.98 NSG_WL(1) 3,934.00 4.78 51.00 3,918.63 3,789.63 204.13 255.00 2,544,750.61 263,664.61 0.49 139.70 NSG_WL(1) 3,954.00 4.78 51.00 3,938.57 3,809.57 205.18 256.29 2,544,751.63 263,665.93 0.00 140.41 NSG_WL(1) 3,974.00 4.72 50.00 3,958.50 3,829.50 206.23 257.57 2,544,752.66 263,667.23 0.51 141.09 NSG_WL(1) 3,994.00 4.68 50.00 3,978.43 3,849.43 207.29 258.82 2,544,753.69 263,668.50 0.20 141.76 NSG_WL(1) 4,014.00 4.63 49.00 3,998.36 3,869.36 208.34 260.06 2,544,754.72 263,669.76 0.48 142.41 NSG_WL(1) 4,034.00 4.72 47.00 4,018.30 3,889.30 209.43 261.27 2,544,755.78 263,670.99 0.93 143.02 NSG_WL(1) 4,054.00 4.82 49.00 4,038.23 3,909.23 210.54 262.51 2,544,756.87 263,672.25 0.97 143.64 NSG_WL(1) 4,074.00 4.86 49.00 4,058.16 3,929.16 211.65 263.78 2,544,757.95 263,673.54 0.20 144.30 NSG_WL(1) 4,094.00 4.85 50.00 4,078.08 3,949.08 212.75 265.07 2,544,759.03 263,674.85 0.43 144.98 NSG_WL(1) 4,114.00 4.91 52.00 4,098.01 3,969.01 213.82 266.39 2,544,760.07 263,676.20 0.90 145.70 NSG_WL(1) 4,134.00 5.00 53.00 4,117.94 3,988.94 214.87 267.76 2,544,761.09 263,677.59 0.62 146.47 NSG_WL(1) 4,154.00 5.08 55.00 4,137.86 4,008.86 215.90 269.18 2,544,762.09 263,679.03 0.97 147.29 NSG_WL(1) 4,174.00 5.08 58.00 4,157.78 4,028.78 216.88 270.66 2,544,763.04 263,680.53 1.33 148.19 NSG_WL(1) 4,194.00 4.94 60.00 4,177.70 4,048.70 217.78 272.15 2,544,763.91 263,682.04 1.12 149.14 NSG_WL(1) 9/19/2017 12:50:37PM Page 7 COMPASS 5000.1 Build 810 • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°I100') (ft) Survey Tool Name 4,214.00 4.66 62.00 4,197.63 4,068.63 218.59 273.62 2,544,764.69 263,683.52 1.63 150.10 NSG_WL(1) 4,234.00 4.47 67.00 4,217.57 4,088.57 219.28 275.05 2,544,765.35 263,684.97 2.20 151.09 NSG_WL(1) 4,254.00 4.39 68.00 4,237.51 4,108.51 219.87 276.48 2,544,765.91 263,686.41 0.56 152.11 NSG_WL(1) 4,274.00 4.40 69.00 4,257.45 4,128.45 220.43 277.90 2,544,766.44 263,687.84 0.39 153.15 NSG_WL(1) 4,294.00 4.38 70.00 4,277.39 4,148.39 220.97 279.34 2,544,766.95 263,689.29 0.40 154.20 NSG_WL(1) 4,314.00 4.50 71.00 4,297.33 4,168.33 221.48 280.80 2,544,767.44 263,690.76 0.71 155.29 NSG_WL(1) 4,334.00 4.44 71.00 4,317.27 4,188.27 221.99 282.27 2544,767.92 263,692.24 0.30 156.39 NSG_WL(1) 4,354.00 4.37 71.00 4,337.21 4,208.21 222.49 283.72 2,544,768.39 263,693.70 0.35 157.48 NSG_WL(1) 1 4,374.00 4.36 71.00 4,357.16 4,228.16 222.99 285.16 2,544,768.85 263,695.15 0.05 158.55 NSG_WL(1) 4,394.00 4.36 71.00 4,377.10 4,248.10 223.48 286.60 2,544,769.32 263,696.60 0.00 159.63 NSG_WL(1) 4,414.00 4.36 72.00 4,397.04 4,268.04 223.97 288.04 2,544,769.77 263,698.05 0.38 160.71 NSG_WL(1) 4,434.00 4.29 72.00 4,416.98 4,287.98 224.43 289.48 2,544,770.21 263,699.50 0.35 161.80 NSG_WL(1) 4,454.00 4.37 72.00 4,436.93 4,307.93 224.90 290.91 2,544,770.65 263,700.94 0.40 162.88 NSG_WL(1) 4,474.00 4.47 72.00 4,456.87 4,327.87 225.37 292.38 2,544,771.09 263,702.42 0.50 163.99 NSG_WL(1) 4,494.00 4.43 72.00 4,476.81 4,347.81 225.85 293.85 2,544,771.54 263,703.90 0.20 165.11 NSG_WL(1) 4,514.00 4.28 72.00 4,496.75 4,367.75 226.32 295.30 2,544,771.98 263,705.36 0.75 166.20 NSG_WL(1) 4,534.00 4.33 72.00 4,516.69 4,387.69 226.79 296.73 2,544,772.42 263,706.79 0.25 167.28 NSG_WL(1) 4,554.00 4.22 72.00 4,536.64 4,407.64 227.25 298.14 2,544,772.85 263,708.22 0.55 168.35 NSG_WL(1) 4,574.00 4.15 72.00 4,556.58 4,427.58 227.70 299.53 2,544,773.27 263,709.62 0.35 169.40 NSG_WL(1) 4,594.00 4.22 71.00 4,576.53 4,447.53 228.16 300.92 2,544,773.71 263,711.01 0.51 170.44 NSG_WL(1) 4,614.00 4.19 71.00 4,596.48 4,467.48 228.64 302.30 2,544,774.15 263,712.41 0.15 171.48 NSG_WL(1) 4,634.00 4.24 72.00 4,616.42 4,487.42 229.11 303.70 2,544,774.59 263,713.81 0.44 172.53 NSG_WL(1) 4,654.00 4.14 71.00 4,636.37 4,507.37 229.57 305.08 2,544,775.03 263,715.20 0.62 173.57 NSG_WL(1) 4,674.00 4.03 70.00 4,656.32 4,527.32 230.04 306.43 2,544,775.48 263,716.56 0.66 174.57 NSG_WL(1) 4,694.00 4.07 71.00 4,676.27 4,547.27 230.52 307.76 2,544,775.92 263,717.90 0.41 175.56 NSG_WL(1) 4,714.00 4.28 71.00 4,696.21 4,567.21 230.99 309.13 2,544,776.37 263,719.28 1.05 176.59 NSG_WL(1) 4,734.00 4.29 72.00 4,716.16 4,587.16 231.46 310.55 2,544,776.81 263,720.71 0.38 177.65 NSG_WL(1) 4,754.00 4.22 72.00 4,736.10 4,607.10 231.92 311.96 2,544,777.24 263,722.13 0.35 178.72 NSG_WL(1) 4,774.00 4.03 72.00 4,756.05 4,627.05 232.37 313.33 2,544,777.66 263,723.51 0.95 179.76 NSG_WL(1) 4,794.00 3.97 71.00 4,776.00 4,647.00 232.81 314.65 2,544,778.07 263,724.84 0.46 180.75 NSG_WL(1) 4,814.00 3.96 71.00 4,795.96 4,666.96 233.26 315.96 2,544,778.50 263,726.15 0.05 181.73 NSG_WL(1) 4,834.00 4.09 69.00 4,815.91 4,686.91 233.74 317.28 2,544,778.95 263,727.48 0.96 182.70 NSG_WL(1) 4,854.00 3.97 68.00 4,835.86 4,706.86 234.26 318.59 2,544,779.44 263,728.80 0.70 183.65 NSG_WL(1) 4,874.00 3.81 69.00 4,855.81 4,726.81 234.75 319.85 2,544,779.91 263,730.07 0.87 184.57 NSG_WL(1) 4,894.00 3.83 70.00 4,875.77 4,746.77 235.22 321.10 2,544,780.35 263,731:33 0.35 185.49 NSG_WL(1) 4,914.00 3.90 70.00 4,895.72 4,766.72 235.68 322.37 2,544,780.79 263,732.61 0.35 186.42 NSG_WL(1) 4,934.00 3.87 69.00 4,915.67 4,786.67 236.16 323.63 2,544,781.24 263,733.88 0.37 187.36 NSG_WL(1) 4,954.00 3.92 68.00 4,935.63 4,806.63 236.65 324.90 2,544,781.71 263,735.16 0.42 188.28 NSG_WL(1) 4,974.00 3.87 68.00 4,955.58 4,826.58 237.16 326.16 2,544,782.19 263,736.43 0.25 189.18 NSG_WL(1) 4,994.00 3.89 68.00 4,975.54 4,846.54 237.67 327.41 2,544,782.67 263,737.69 0.10 190.09 NSG_WL(1) 9/19/2017 12:50:37PM Page 8 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) i4. (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 5,014.00 3.80 69.00 4,995.49 4,866.49 238.16 328.66 2,544,783.14 263,738.95 0.56 191.00 NSG_WL(1) 5,034.00 3.80 68.00 5,015.45 4,886.45 238.65 329.89 2,544,783.60 263,740.19 0.33 191.89 NSG_WL(1) 5,054.00 3.98 67.00 5,035.40 4,906.40 239.17 331.15 2,544,784.09. 263,741.46 0.96 192.79 NSG_WL(1) 5,074.00 3.95 66.00 5,055.35 4,926.35 239.72 332.42 2,544,784.62 263,742.73 0.38 193.69 NSG_WL(1) 5,094.00 3.94 66.00 5,075.31 4,946.31 240.28 333.67 2,544,785.15 263,744.00 0.05 194.57 NSG_WL(1) 5,114.00 3.95 65.00 5,095.26 4,966.26 240.85 334.92 2,544,785.70 263,745.27 0.35 195.45 NSG WL(1) 5,134.00 3.97 66.00 5,115.21 4,986.21 241.42 336.18 2,544,786.24 263,746.53 0.36 196.33 NSG_WL(1) 5,154.00 4.00 66.00 5,135.16 5,006.16 241.99 337.45 2,544,786.78 263,747.82 0.15 197.22 NSG_WL(1) 5,174.00 3.96 66.00 5,155.11 5,026.11 242.55 338.72 2,544,787.32 263,749.09 0.20 198.11 NSG_WL(1) 5,194.00 4.05 68.00 5,175.07 5,046.07 243.10 340.01 2,544,787.84 263,750.39 0.83 199.03 NSG_WL(1) 5,214.00 4.14 68.00 5,195.01 5,066.01 243.63 341.33 2,544,788.35 263,751.73 0.45 199.98 NSG_WL(1) 5,234.00 4.10 68.00 5,214.96 5,085.96 244.17 342.66 2,544,788.86 263,753.07 0.20 200.95 NSG_WL(1) 5,254.00 4.08 68.00 5,234.91 5,105.91 244.70 343.98 2,544,789.37 263,754.40 0.10 201.90 NSG_WL(1) 5,274.00 4.09 68.00 5,254.86 5,125.86 245.24 345.31 2,544,789.87 263,755.73 0.05 202.85 NSG_WL(1) 5,294.00 4.15 68.00 5,274.81 5,145.81 245.78 346.64 2,544,790.39 263,757.08 0.30 203.81 NSG_WL(1) 5,314.00 4.03 68.00 5,294.76 5,165.76 246.31 347.96 2,544,790.89 263,758.41 0.60 204.77 NSG_WL(1) 5,334.00 3.92 66.00 5,314.71 5,185.71 246.85 349.24 2,544,791.41 263,759.70 0.88 205.68 NSG_WL(1) 5,354.00 3.85 65.00 5,334.66 5,205.66 247.41 350.47 2,544,791.95 263,760.94 0.49 206.54 NSG_WL(1) 5,374.00 3.85 64.00 5,354.62 5,225.62 247.99 351.68 2,544,792.50 263,762.16 0.34 207.38 NSG_WL(1) 5,394.00 4.00 62.00 5,374.57 5,245.57 248.61 352.90 2,544,793.10 263,763.40 1.02 208.20 NSG_WL(1) 5,414.00 3.91 61.00 5,394.52 5,265.52 249.27 354.11 2,544,793.73 263,764.62 0.57 209.00 NSG_WL(1) 5,434.00 3.99 61.00 5,414.48 5,285.48 249.94 355.32 2,544,794.37 263,765.84 0.40 209.79 NSG_WL(1) 5,454.00 4.10 62.00 5,434.43 5,305.43 250.61 356.56 2,544,795.02 263,767.09 0.65 210.61 NSG_WL(1) 5,474.00 4.04 63.00 5,454.38 5,325.38 251.27 357.82 2,544,795.65 263,768.36 0.46 211.46 NSG_WL(1) 5,494.00 4.02 60.00 5,474.33 5,345.33 251.94 359.05 2,544,796.29 263,769.61 1.06 212.27 NSG_WL(1) 5,514.00 4.08 61.00 5,494.28 5,365.28 252.63 360.28 2,544,796.96 263,770.86 0.46 213.07 NSG_WL(1) 5,534.00 3.95 61.00 5,514.23 5,385.23 253.31 361.51 2,544,797.62 263,772.09 0.65 213.87 NSG_WL(1) 5,554.00 3.83 58.00 5,534.18 5,405.18 254.00 362.67 2,544,798.28 263,773.28 1.18 214.62 NSG_WL(1) 5,574.00 3.80 57.00 5,554.14 5,425.14 254.71 363.80 2,544,798.97 263,774.41 0.36 215.32 NSG_WL(1) 5,594.00 3.80 56.00 5,574.09 5,445.09 255.45 364.90 2,544,799.68 263,775.53 0.33 215.99 NSG_WL(1) 5,614.00 3.81 55.00 5,594.05 5,465.05 256.20 366.00 2,544,800.41 263,776.64 0.34 216.65 NSG_WL(1) 5,634.00 3.81 54.00 5,614.01 5,485.01 256.97 367.08 2,544,801.16 263,777.74 0.33) 217.28 NSG_WL(1) 5,654.00 3.82 54.00 5,633.96 5,504.96 257.75 368.15 2,544,801.92 263,778.83 0.05 217.90 NSG_WL(1) 5,674.00 3.79 53.00 5,653.92 5,524.92 258.54 369.22 2,544,802.69 263,779.91 0.36 218.52 NSG_WL(1) 5,694.00 3.79 52.00 5,673.87 5,544.87 259.35 370.27 2,544,803.47 263,780.98 0.33 219.11 NSG_WL(1) 5,714.00 3.78 50.00 5,693.83 5,564.83 260.18 371.30 2,544,804.28 263,782.02 0.66 219.66 NSG_WL(1) 5,734.00 3.83 50.00 5,713.79 5,584.79 261.03 372.31 2,544,805.12 263,783.06 0.25 220.20 NSG_WL(2) 5,754.00 3.85 50.00 5,733.74 5,604.74 261.89 373.34 2,544,805.96 263,784.10 0.10 220.75 NSG_W1 (2) 5,774.00 3.82 50.00 5,753.70 5,624.70 262.75 374.36 2,544,806.79 263,785.14 0.15 221.29 NSG_WL(2) 5,794.00 3.90 48.00 5,773.65 5,644.65 263.63 375.38 2,544,807.66 263,786.17 0.78 221.82 NSG_WL(2) 9/19/2017 12:50:37PM Page 9 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) A (usft) (usft) (usft) (ft) 1. (ft) (°/100') (ft) Survey Tool Name 5,814.00 4.14 48.00 5,793.60 5,664.60 264.57 376.42 2,544,808.57 263,787.23 1.20 222.34 NSG_WL(2) 5,834.00 4.49 50.00 5,813.55 5,684.55 265.56 377.56 2,544,809.54 263,788.39 1.90 222.93 NSG_WL(2) 5,854.00 5.24 54.00 5,833.47 5,704.47 266.60 378.90 2,544,810.55 263,789.75 4.11 223.68 NSG_WL(2) , 5,874.00 6.39 57.00 5,853.37 5,724.37 267.74 380.57 2,544,811.66 263,791.45 5.95 224.68 NSG_WL(2) 5,894.00 7.55 59.00 5,873.22 5,744.22 269.02 382.63 2,544,812.90 263,793.53 5.92 225.97 NSG_WL(2) 5,914.00 8.19 60.00 5,893.03 5,764.03 270.41 384.99 2,544,814.24 263,795.92 3.27 227.48 NSG_WL(2) 5,934.00 8.35 60.00 5,912.83 5,783.83 271.85 387.48 2,544,815.63 263,798.44 0.80 229.09 NSG_WL(2) 5,954.00 8.39 61.00 5,932.61 5,803.61 273.29 390.01 2,544,817.01 263,801.00 0.75 230.74 NSG_WL(2) 5,974.00 8.41 61.00 5,952.40 5,823.40 274.70 392.57 2,544,818.37 263,803.58 0.10 232.42 NSG_WL(2) 5,994.00 8.41 61.00 5,972.18 5,843.18 276.12 395.13 2,544,819.74 263,806.17 0.00 234.09 NSG_W1 (2) 6,014.00 8.52 61.00 5,991.96 5,862.96 277.55 397.70 2,544,821.11 263,808.77 0.55 235.78 NSG_WL(2) 6,034.00 8.68 61.00 6,011.74 5,882.74 279.00 400.32 2,544,822.51 263,811.42 0.80 237.50 NSG_WL(2) 6,054.00 8.67 61.00 6,031.51 5,902.51 280.46 402.96 2,544,823.92 263,814.09 0.05 239.23 NSG_WL(2) 6,074.00 8.61 62.00 6,051.28 5,922.28 281.89 405.60 2,544,825.30 263,816.75 0.81 240.97 NSG_WL(2) 6,094.00 8.55 62.00 6,071.06 5,942.06 283.29 408.23 2,544,826.64 263,819.42 0.30 242.73 NSG_WL(2) 6,114.00 8.45 62.00 6,090.84 5,961.84 284.68 410.84 2,544,827.98 263,822.05 0.50 244.47 NSG_WL(2) 6,134.00 8.34 62.00 6,110.63 5,981.63 286.05 413.42 2,544,829.30 263,824.66 0.55 246.18 NSG_WL(2) 6,154.00 8.30 62.00 6,130.42 6,001.42 287.41 415.97 2,544,830.60 263,827.24 0.20 247.88 NSG_WL(2) 6,174.00 8.16 62.00 6,150.21 6,021.21 288.76 418.50 2,544,831.90 263,829.80 0.70 249.57 NSG_WL(2) 6,194.00 8.03 62.00 6,170.01 6,041.01 290.08 420.99 2,544,833.17 263,832.31 0.65 251.22 NSG_WL(2) 6,214.00 7.99 61.00 6,189.82 6,060.82 291.41 423.44 2,544,834.45 263,834.79 0.72 252.84 NSG_WL(2) 6,234.00 7.89 61.00 6,209.62 6,080.62 292.75 425.85 2,544,835.74 263,837.23 0.50 254.42 NSG_W1_(2) 6,254.00 7.64 61.00 6,229.44 6,100.44 294.06 428.22 2,544,837.00 263,839.62 1.25 255.97 NSG_WL(2) 6,274.00 7.40 60.00 6,249.27 6,120.27 295.35 430.50 2,544,838.24 263,841.92 1.37 257.46 NSG_WL(2) 6,294.00 7.38 60.00 6,269.10 6,140.10 296.63 432.72 2,544,839.48 263,844.17 0.10 258.89 NSG_W1 (2) 6,314.00 7.25 60.00 6,288.94 6,159.94 297.90 434.93 2,544,840.71 263,846.41 0.65 260.32 NSG_WL(2) 6,334.00 6.94 60.00 6,308.79 6,179.79 299.14 437.07 2,544,841.90 263,848.57 1.55 261.70 NSG_WL(2) 6,354.00 6.77 58.00 6,328.64 6,199.64 300.37 439.11 2,544,843.09 263,850.64 1.47 263.00 NSG_WL(2) 6,374.00 6.78 58.00 6,348.50 6,219.50 301.62 441.12 2,544,844.30 263,852.67 0.05 264.25 NSG_WL(2) 6,394.00 6.67 58.00 6,368.37 6,239.37 302.86 443.10 2,544,845.50 263,854.68 0.55 265.49 NSG_WL(2) 6,414.00 6.49 57.00 6,388.23 6,259.23 304.09 445.03 2,544,846.69 263,856.63 1.07 266.69 NSG_WL(2) 6,434.00 6.44 56.00 6,408.11 6,279.11 305.33 446.91 2,544,847.89 263,858.54 0.62 267.83 NSG_WL(2) 6,454.00 6.32 56.00 6,427.98 6,298.98 306.58 448.76 2,544,849.10 263,860.40 0.60 268.94 NSG_WL(2) 6,474.00 6.22 56.00 6,447.86 6,318.86 307.80 450.57 2,544,850.28 263,862.24 0.50 270.04 NSG_WL(2) 6,494.00 5.95 55.00 6,467.75 6,338.75 309.00 452.31 2,544,851.45 263,864.01 1.45 271.08 NSG_WL(2) 6,514.00 5.73 54.00 6,487.65 6,358.65 310.18 453.97 2,544,852.60 263,865.69 1.21 272.05 NSG_WL(2) 6,534.00 5.69 54.00 6,507.55 6,378.55 311.35 455.58 2,544,853.73 263,867.32 0.20 272.99 NSG_WL(2) 6,554.00 5.64 53.00 6,527.45 6,398.45 312.52 457.17 2,544,854.87 263,868.93 0.55 273.90 NSG_WL(2) 6,574.00 5.47 53.00 6,547.36 6,418.36 313.69 458.71 2,544,856.01 263,870.50 0.85 274.78 NSG_WL(2) 6,594.00 5.35 52.00 6,567.27 6,438.27 314.84 460.21 2,544,857.12 263,872.02 0.76 275.62 NSG_WL(2) 9/19/2017 12:50:37PM Page 10 COMPASS 5000.1 Build 810 • Halliburton 411 Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB1 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS '‘ +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) 4 (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 6,614.00 5.23 51.00 6,587.18 6,458.18 315.98 461.65 2,544,858.24 263,873.49 0.76 276.41 NSG_WL(2) 6,634.00 5.14 49.00 6,607.10 6,478.10 317.15 463.04 2,544,859.38 263,874.90 1.01 277.15 NSG (2) 6,654.00 5.07 49.00 6,627.02 6,498.02 318.31 464.38 2,544,860.52 263,876.26 0.35 277.84 NSG_WL(2) 1 6,752.00 9.34 71.72 6,724.24 6,595.24 323.65 475.21 2,544,865.63 263,887.20 5.16 285.23 MWD(3) 6,846.00 12.40 75.27 6,816.55 6,687.55 328.61 492.21 2,544,870.25 263,904.30 3.33 298.34 MWD(3) 6,941.00 15.00 78.05 6,908.84 6,779.84 333.75 514.11 2,544,874.94 263,926.30 2.82 315.77 MWD(3) 7,035.00 17.09 75.81 6,999.17 6,870.17 339.66 539.40 2,544,880.33 263,951.70 2.32 335.92 MWD(3) 7,128.00 19.82 79.10 7,087.38 6,958.38 345.99 568.14 2,544,886.08 263,980.56 3.14 358.97 MWD(3) 7,221.00 22.08 82.87 7,174.23 7,045.23 351.14 600.97 2,544,890.56 264,013.49 2.83 386.22 MWD(3) 7,315.00 23.96 85.84 7,260.75 7,131.75 354.72 637.54 2,544,893.40 264,050.13 2.35 417.52 MWD(3) 7,410.00 25.90 86.14 7,346.89 7,217.89 357.52 677.49 2,544,895.38 264,090.12 2.05 452.20 MWD(3) 7,503.00 28.00 89.35 7,429.79 7,300.79 359.13 719.59 2,544,896.14 264,132.24 2.75 489.33 MWD(3) 7,598.00 30.61 91.52 7,512.63 7,383.63 358.74 766.08 2,544,894.81 264,178.71 2.97 531.28 MWD(3) 7,691.00 33.90 92.28 7,591.27 7,462.27 357.08 815.67 2,544,892.14 264,228.26 3.56 576.59 MWD(3) 7,784.00 36.62 92.30 7,667.20 7,538.20 354.94 869.31 2,544,888.90 264,281.84 2.92 625.74 MWD(3) 7,880.00 40.42 92.38 7,742.29 7,613.29 352.49 929.04 2,544,885.25 264,341.51 3.96 680.49 MWD(3) 7,975.00 42.53 93.07 7,813.47 7,684.47 349.50 991.88 2,544,880.98 264,404.27 2.27 738.29 MWD(3) 8,071.00 45.23 92.27 7,882.66 7,753.66 346.41 1,058.35 2,544,876.54 264,470.66 2.87 799.38 MWD(3) 8,166.00 48.14 92.52 7,947.82 7,818.82 343.52 1,127.40 2,544,872.24 264,539.63 3.07 862.71 MWD(3) 8,261.00 50.50 91.41 8,009.74 7,880.74 341.06 1,199.39 2,544,868.32 264,611.56 2.64 928.50 MWD(3) 8,356.00 52.75 91.13 8,068.72 7,939.72 339.41 1,273.85 2,544,865.17 264,685.96 2.38 996.14 MWD(3) 8,451.00 53.71 92.27 8,125.58 7,996.58 337.15 1,349.91 2,544,861.36 264,761.96 1.39 1,065.49 MWD(3) 8,495.00 54.19 92.54 8,151.48 8,022.48 335.66 1,385.45 2,544,859.14 264,797.47 1.20 1,098.10 MWD_InterpAzi+sag(4) 8,579.00 54.78 96.06 8,200.28 8,071.28 330.52 1,453.61 2,544,852.63 264,865.51 3.48 1,161.61 MWD_InterpAzi+sag(4) 8,641.49 51.53 98.77 8,237.76 8,108.76 324.10 1,503.19 2,544,845.20 264,914.94 6.25 1,208.99 MWD+SC+sag(5) 8,702.58 47.92 104.87 8,277.26 8,148.26 314.62 1,548.78 2,544,834.80 264,960.33 9.64 1,254.11 MWD+SC+sag(5) 8,765.67 45.07 110.87 8,320.71 8,191.71 300.65 1,592.31 2,544,819.94 265,003.56 8.24 1,299.36 MWD+SC+sag(5) 8,826.06 42.12' 116.12 8,364.46 8,235.46 284.11 1,630.49 2,544,802.63 265,041.39 7.73 1,340.93 MWD+SC+sag(5) 8,889.06 40.30 119.00 8,411.85 8,282.85 264.93 1,667.28 2,544,782.71 265,077.79 4.17 1,382.41 MWD+SC+sag(5) 8,950.16 39.20 122.99 8,458.84 8,329.84 244.83 1,700.76 2,544,761.94 265,110.86 4.55 1,421.31 MWD+SC+sag(5) 9,013.48 37.37 127.26 8,508.55 8,379.55 222.29 1,732.85 2,544,738.75 265,142.48 5.08 1,460.03 MWD+SC+sag(5) 9,073.40 34.45 130.43 8,557.08 8,428.08 200.29 1,760.23 2,544,716.20 265,169.40 5.78 1,494.29 MWD+SC+sag(5) '9,134.98 32.57 135.79 8,608.43 8,479.43 177.10 1,785.06 2,544,692.51 265,193.75 5.69 1,526.76 MWD+SC+sag(5) 9,197.08 30.36 140.88 8,661.41 8,532.41 152.94 1,806.62 2,544,667.92 265,214.82 5.56 1,556.73 MWD+SC+sag(5) 9,261.88 29.71 146.20 8,717.51 8,588.51 126.89 1,825.89 2,544,641.48 265,233.55 4.23 1,585.47 MWD+SC+sag(5) 9,322.31 32.79 150.33 8,769.18 8,640.18 100.21 1,842.32 2,544,614.48 265,249.44 6.21 1,611.94 MWD+SC+sag(5) 9,383.34 32.83 153.63 8,820.47 8,691.47 71.03 1,857.85 2,544,584.99 265,264.38 2.93 1,638.69 MWD+SC+sag(5) 9,446.23 32.09 156.27 8,873.54 8,744.54 40.46 1,872.15 2,544,554.14 265,278.05 2.54 1,664.94 MWD+SC+sag(5) 9,507.48 30.43 154.64 8,925.90 8,796.90 11.55 1,885.34 2,544,524.96 265,290.65 3.04 1,689.47 MWD+SC+sag(5) • 9,569.06 31.74 151.33 8,978.64 8,849.64 -16.76 1,899.79 2,544,496.37 265,304.52 3.50 1,714.87 MWD+SC+sag(5) 9/19/2017 12:50:37PM . Page 11 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC i:Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 (, North Reference: True Wellbore: GP 22-13RD3 PB1 rSurvey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB1 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 9,630.87 31.78 145.27 9,031.21 8,902.21 -44.41 1,916.87 2,544,468.38 265,321.04 5.16 1,742.34 MWD+SC+sag(5) 9,692.26 31.10 138.77 9,083.60 8,954.60 -69.62 1,936.54 2,544,442.77 265,340.18 5.63 1,771.07 MWD+SC+sag(5) 9,754.53 32.45 136.34 9,136.54 9,007.54 -93.81 1,958.67 2,544,418.14 265,361.82 2.99 1,801.56 MWD+SC+sag(5) 9,816.60 32.33 138.39 9,188.95 9,059.95 -118.26 1,981.19 2,544,393.23 265,383.84 1.78 1,832.53 MWD+SC+sag(5) 9,878.68 33.37 140.57 9,241.11 9,112.11 -143.87 2,003.06 2,544,367.20 265,405.18 2.54 1,863.40 MWD+SC+sag(5) , 9,941.04 33.80 144.93 9,293.06 9,164.06 -171.31 2,023.92 2,544,339.33 265,425.48 3.93 1,894.19 MWD+SC+sag(5) 10,002.79 30.85 143.54 9,345.24 9,216.24 -198.11 2,043.20 2,544,312.15 265,444.21 4.93 1,923.26 MWD+SC+sag(5) 10,064.52 29.66 138.04 9,398.57 9,269.57 -222.20 2,062.83 2,544,287.66 265,463.34 4.88 1,951.46 MWD+SC+sag(5) 10,125.62 31.29 134.65 9,451.23 9,322.23 -244.60 2,084.22 2,544,264.84 265,484.28 3.88 1,980.51 MWD+SC+sag(5) 10,187.18 32.87 135.68 9,503.39 9,374.39 -267.79 2,107.27 2,544,241.19 265,506.85 2.72 2,011.39 MWD+SC+sag(5) 10,249.43 33.91 140.96 9,555.38 9;426.38 -293.37 2,130.01 2,544,215.15 265,529.07 4.96 2,043.05 MWD+SC+sag(5) 10,311.48 35.33 145.34 9,606.45 9,477.45 -321.57 2,151.12 2,544,186.52 265,549.60 4.62 2,074.39 MWD+SC+sag(5) 10,375.01 34.54 148.33 9,658.53 9,529.53 -352.01 2,171.03 2,544,155.69 265,568.88 2.97 2,105.62 MWD+SC+sag(5) 10,436.85 33.69 148.47 9,709.73 9,580.73 -381.55 2,189.20 2,544,125.78 265,586.45 1.38 2,134.90 MWD+SC+sag(5) 10,498.73 31.73 145.58 9,761.80 9,632.80 -409.61 2,207.38 2,544,097.37 265,604.05 4.05 2,163.54 MWD+SC+sag(5) 10,563.03 32.61 143.53 9,816.23 9,687.23 -437.49 2,227.24 2,544,069.09 265,623.34 2.18 2,193.61 MWD+SC+sag(5) ' 10,623.67 35.00 143.32 9,866.61 9,737.61 -464.58 2,247.34 2,544,041.59 265,642.89 3.95 2,223.55 MWD+SC+sag(5) 10,682.96 36.60 142.71 9,914.70 9,785.70 -492.28 2,268.21 2,544,013.48 265,663.19 2.76 2,254.45 MWD+SC+sag(5) 10,748.79 38.70 140.32 9,966.82 9,837.82 -523.74 2,293.24 2,543,981.52 265,687.58 3.88 2,290.74 MWD+SC+sag(5) 10,810.72 41.96 138.86 10,014.02 9,885.02 -554.24 2,319.23 2,543,950.50 265,712.94 5.48 2,327.47 MWD+SC+sag(5) 10,872.35 45.89 135.96 10,058.41 9,929.41 -585.68 2,348.18 2,543,918.48 265,741.25 7.16 2,367.27 MWD+SC+sag(5) 10,933.92 50.01 134.11 10,099.64 9,970.64 -618.00 2,380.50 2,543,885.51 265,772.90 7.05 2,410.49 MWD+SC+sag(5) 10,996.37 54.10 131.75 10,138.04 10,009.04 -651.51 2,416.56 2,543,851.27 265,808.27 7.19 2,457.60 MWD+SC+sag(5) 11,059.56 57.89 130.28 10,173.37 10,044.37 -685.87 2,456.09 2,543,816.12 265,847.09 6.30 2,508.18 MWD+SC+sag(5) 11,123.26 62.83 128.02 10,204.87 10,075.87 -720.79 2,499.02 2,543,780.34 265,889.31 8.34 2,562.08 MWD+SC+sag(5) 11,184.44 67.64 129.34 10,230.49 10,101.49 -755.51 2,542.37 2,543,744.75 265,931;94 8.10 2,616.26 MWD+SC+sag(5) 11,246.49 68.65 127.75 10,253.59 10,124.59 -791.39 2,587.41 2,543,707.96 265,976.24 2.88 2,672.47 MWD+SC+sag(5) 11,309.06 65.58 125.57 10,277.92 10,148.92 -825.81 2,633.64 2,543,672.61 266,021.76 5.86 2,729.11 MWD+SC+sag(5) 11,371.15 65.57 125.42 10,303.59 10,174.59 -858.63 2,679.66 2,543,638.86 266,067.11 0.22 2,784.87 MWD+SC+sag(5) 11,433.25 64.32 125.46 10,329.89 10,200.89 -891.25 2,725.50 2,543,605.31 266,112.26 2.01 2,840.36 MWD+SC+sag(5) 11,496.56 63.38 126.36 10,357.80 10,228.80 -924.58 2,771.53 2,543,571.06 266,157.60 1.96 2,896.34 MWD+SC+sag(5) 11,557.97 62.79 126.99 10,385.59 10,256.59 -957.29 2,815.44 2,543,537.47 266,200.85 1.33 2,950.15 MWD+SC+sag(5) 11,620.84 63.36 128.95 10,414.06 10,285.06 -991.78 2,859.63 2,543,502.09 266,244.32 2.92 3,004.98 MWD+SC+sag(5) 11,682.27 63.21 131.16 10,441.68 10,312.68 -1,027.08 2,901.63 2,543,465.94 266,285.59 3.22 3,058.21 MWD+SC+sag(5) 11,781.00 63.21 131.16 10,486.18 10,357.18 -1,085.09 2,967.98 2,543,406.60 266,350.75 0.00 3,143.27 PROJECTED to TD mitchell.laird@halliburton.com Michael Calkins 7/20/1 7 Checked By: 2on.09.200936:03-os'oo' Approved By: .,„,,im�,,� `'� Date: 9/19/2017 12:50:37PM Page 12 COMPASS 5000.1 Build 81D • i Hilcorp Alaska, LLC Granite Point Granite Point Platform GP 22-13RD3 PB2 50733200957300 Sperry Drilling Definitive Survey Report 19 September, 2017 • ■ HALLIBURTON ■ ■ • ■ Sperry Drifting • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC 'f:'Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 : Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Project Granite Point Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well GP-22-13RD3,Leg3 Slot2 Well Position +N/-S 0.00 usft Northing: 2,544,551.71 usft Latitude: 60°57'29.327 N +E/-W 0.00 usft Easting: 263,405.53 usft Longitude: 151°19'52.274 W Position Uncertainty 0.00 usft Wellhead Elevation: 129.00 usft Water Depth: 75.00 usft Wellbore GP 22-13RD3 PB2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2017 8/23/2017 16.08 73.84 55,445 Design GP 22-13RD3 PB2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,748.79 Vertical Section: Depth From(TVD) ('4p.. +N/ i-e Direction (usft) (tisft) ,g, ';',i , ( ) 0.00 0.00 0.00 115.46 Survey Program Date 9/19/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 34.00 5,714.00 GP22-13RD GCT(1)(GP 22-13 PB1) NSG_WL North seeking gyro on wireline 12/20/1995 5,734.00 6,654.00 GP22-13RD GCT(2)(GP-22-13) NSG_WL North seeking gyro on wireline 12/20/1995 6,752.00 8,451 00 MWD(GP-22-13RD PB1) MWD Fixed:v2:standard declination 11/28/1995 8,495.00 8,579.00 MWD_Interp Azi+sag(GP 22-13RD3 PB MWD_Interp Azi+sag Fixed:v2:std dec with interpolated azimuth+sag 08/10/2017 8,641.49 10,748.79 MWD+SC+sag(GP 22-13RD3 PB1) MWD+SC+sag Fixed:v2:standard dec&axial correction+sag 08/18/2017 10,810.68 12,239.03 MWD+SC+sag(GP 22-13RD3 PB2) MWD+SC+sag Fixed:v2:standard dec&axial correction+sag 08/23/2017 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 0.00 0.00 0.00 0.00 -129.00 0.00 0.00 2,544,551.71 263,405.53 0.00 0.00 UNDEFINED 34.00 0.39 192.00 34.00 -95.00 -0.11 -0.02 2,544,551.60 263,405.50 1.15 0.03 NSG_WL(1) 54.00 0.40 198.00 54.00 -75.00 -0.25 -0.06 2,544,551.47 263,405.47 0.21 0.05 NSG_WL(1) 74.00 0.32 213.00 74.00 -55.00 -0.36 -0.11 2,544,551.35 263,405 41 0.61 0.05 NSG_WL(1) 94.00 0.16 219.00 94.00 -35.00 -0.43 -0.16 2,544,551.29 263,405.36 0.81 0.04 NSG_WL(1) 114.00 0.12 227.00 114.00 -15.00 -0.46 -0.19 2,544,551 25 263,405.33 0.22 0.03 NSG_WL(1) 134.00 0.11 244.00 134.00 5.00 -0.49 -0.23 2,544,551.23 263,405.30 0.18 0.01 NSG_WL(1) 154.00 0.12 266.00 154.00 25.00 -0.50 -0.26 2,544,551.22 263,405.26 0.22 -0.02 NSG_WL(1) 174.00 0.16 276.00 174.00 45.00 -0.50 -0.31 2,544,551.22 263,405.21 0.23 -0.07 NSG_WL(1) 194.00 0.23 274.00 194.00 65.00 -0.49 -0.38 2,544,551.23 263,405.14 0.35 -0.13 NSG_WL(1) 9/19/2017 12:52:10PM Page 2 COMPASS 5000.1 Build 81D III Halliburton • Definitive Survey Report $'Q%&'7 Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 214.00 0.35 272.00 214.00 85.00 -0.48 -0.48 2,544,551.24 263,405.04 0.60 -0.23 NSG_WL(1) 234.00 0.50 268.00 234.00 105.00 -0.49 -0.63 2,544,551.24 263,404.89 0.76 -0.36 NSG_WL(1) 254.00 0.65 263.00 254.00 125.00 -0.50 -0.83 2,544,551.23 263,404.69 0.79 -0.53 NSG_WL(1) 274.00 0.71 261.00 274.00 145.00 -0.54 -1.06 2,544,551.20 263,404.46 0.32 -0.73 NSG_WL(1) 294.00 0.70 262.00 293.99 164.99 -0.57 -1.31 2,544,551.17 263,404.21 0.08 -0.93 NSG_WL(1) 314.00 0.55 266.00 313.99 184.99 -0.60 -1.52 2,544,551.15 263,404.00 0.78 -1.12 NSG_WL(1) 334.00 0.32 294.00 333.99 204.99 -0.58 -1.67 2,544,551.17 263,403.85 1.53 -1.26 NSG_WL(1) 354.00 0.53 125.00 353.99 224.99 -0.61 -1.65 2,544,551.13 263,403.87 4.23 -1.22 NSG_WL(1) 374.00 1.59 42.00 373.99 244.99 -0.46 -1.38 2,544,551.28 263,404.14 8.07 -1.05 NSG_WL(1) 394.00 3.11 49.00 393.97 264.97 0.11 -0.79 2,544,551.83 263,404.74 7.72 -0.76 NSG_WL(1) 414.00 4.96 52.00 413.92 284.92 0.99 0.30 2,544,552.70 263,405.85 9.31 -0.16 NSG_WL(1) 434.00 6.35 53.00 433.82 304.82 2.19 1.87 2,544,553.86 263,407.44 6.97 0.74 NSG_WL(1) 454.00 6.87 53.00 453.69 324.69 3.58 3.70 2,544,555.21 263,409.31 2.60 1.81 NSG_WL(1) 474.00 7.01 53.00 473.54 344.54 5.03 5.63 2,544,556.63 263,411.27 0.70 2.92 NSG_WL(1) 494.00 7.03 53.00 493.39 364.39 6.50 7.59 2,544,558.06 263,413.25 0.10 4.05 NSG_WL(1) 514.00 7.11 54.00 513.24 384.24 7.97 9.57 2,544,559.48 263,415.26 0.73 5.21 NSG_WL(1) 534.00 7.16 54.00 533.09 404.09 9.43 11.58 2,544,560.90 263,417.29 0.25 6.40 NSG_WL(1) 554.00 7.15 54.00 552.93 423.93 10.89 13.59 2,544,562.32 263,419.34 0.05 7.59 NSG_WL(1) 574.00 7.12 55.00 572.78 443.78 12.33 15.61 2,544,563.72 263,421.39 0.64 8.79 NSG_WL(1) 594.00 7.03 55.00 592.62 463.62 13.75 17.63 2,544,565.10 263,423.44 0.45 10.01 NSG_WL(1) 614.00 7.01 56.00 612.47 483.47 15.13 19.65 2,544,566.44 263,425.48 0.62 11.23 NSG_WL(1) 634.00 6.83 56.00 632.33 503.33 16.48 21.64 2,544,567.75 263,427.50 0.90 12.46 NSG_WL(1) 654.00 6.74 56.00 652.19 523.19 17.80 23.60 2,544,569.03 263,429.49 0.45 13.66 NSG_WL(1) 674.00 6.71 56.00 672.05 543.05 19.11 25.54 2,544,570.30 263,431.46 0.15 14.85 NSG_WL(1) 694.00 6.51 56.00 691.92 562.92 20.40 27.45 2,544,571.55 263,433.39 1.00 16.02 NSG_WL(1) 714.00 6.23 56.00 711.79 582.79 21.64 29.29 2,544,572.75 263,435.25 1.40 17.15 NSG_WL(1) 734.00 6.06 55.00 731.68 602.68 22.85 31.06 2,544,573.92 263,437.04 1.00 18.22 NSG_WL(1) 754.00 5.85 55.00 751.57 622.57 24.04 32.76 2,544,575.08 263,438.77 1.05 19.24 NSG_WL(1) 774.00 5.70 54.00 771.47 642.47 25.21 34.39 2,544,576.21 263,440.43 0.90 20.22 NSG_WL(1) 794.00 5.46 54.00 791.37 662.37 26.35 35.97 2,544,577.33 263,442.02 1.20 21.15 NSG_WL(1) 814.00 5.29 53.00 811.29 682.29 27.47 37.47 2,544,578.41 263,443.55 0.97 22.03 NSG_WL(1) 834.00 5.11 53.00 831.20 702.20 28.56 38.92 2,544,579.47 263,445.02 0.90 22.87 NSG_VVL(1) 854.00 4.96 52.00 851.13 722.13 29.63 40.31 2,544,580.51 263,446.44 0.87 23.66 NSG_WL(1) 874.00 4.84 52.00 871.05 742.05 30.68 41.66 2,544,581.53 263,447.80 0.60 24.43 NSG_WL(1) 894.00 4.77 51.00 890.98 761.98 31.72 42.97 2,544,582.55 263,449.14 0.55 25.16 NSG_WL(1) 914.00 4.75 50.00 910.92 781.92 32.78 44.25 2,544,583.58 263,450.44 0.43 25.86 NSG_WL(1) 934.00 4.66 49.00 930.85 801.85 33.84 45.50 2,544,584.62 263,451.71 0.61 26.53 NSG_WL(1) 954.00 4.62 48.00 950.78 821.78 34.91 46.71 2,544,585.67 263,452.94 0.45 27.17 NSG_WL(1) 974.00 4.62 48.00 970.72 841.72 35.99 47.91 2,544,586.72 263,454.16 0.00 27.78 NSG_WL(1) 994.00 4.64 48.00 990.65 861.65 37.07 49.11 2,544,587.78 263,455.38 0.10 28.40 NSG_WL(1) 9/19/2017 12:52:10PM Page 3 COMPASS 5000.1 Build 81D • Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) it (usft) (usft) ,. (usft) i (ft) (ft) (°I100') (ft) Survey Tool Name 1,014.00 4.66 48.00 1,010.59 881.59 38.16 50.31 2,544,588.84 263,456.61 0.10 29.02 NSG_WL(1) 1,034.00 4.68 48.00 1,030.52 901.52 39.25 51.52 2,544,589.90 263,457.84 0.10 29.65 NSG_WL(1) 1,054.00 4.70 49.00 1,050.45 921.45 40.33 52.75 2,544,590.96 263,459.08 0.42 30.29 NSG_WL(1) 1,074.00 4.71 49.00 1,070.39 941.39 41.40 53.99 2,544,592.01 263,460.34 0.05 30.94 NSG_WL(1) 1,094.00 4.71 50.00 1,090.32 961.32 42.47 55.23 2,544,593.05 263,461.61 0.41 31.61 NSG_WL(1) 1,114.00 4.76 50.00 1,110.25 981.25 43.53 56.50 2,544,594.09 263,462.90 0.25 32.30 NSG_WL(1) 1,134.00 4.76 . 50.00 1,130.18 1,001.18 44.60 57.77 2,544,595.13 263,464.19 0.00 32.99 NSG_WL(1) 1,154.00 4.78 50.00 1,150.11 1,021.11 45.67 59.04 2,544,596.17 263,465.49 0.10 33.68 NSG_WL(1) 1,174.00 4.80 50.00 1,170.04 1,041.04 46.74 60.32 2,544,597.22 263,466.79 0.10 34.37 NSG_WL(1) 1,194.00 4.80 50.00 1,189.97 1,060.97 47.82 61.61 2,544,598.27 263,468.09 0.00 35.07 NSG_WL(1) • 1,214.00 4.83 50.00 1,209.90 1,080.90 48.90 62.89 2,544,599.32 263,469.40 0.15 35.76 NSG_WL(1) 1,234.00 4.85 50.00 1,229.83 1,100.83 49.98 64.18 2,544,600.38 263,470.72 0.10 36.47 NSG_WL(1) 1,254.00 4.83 50.00 1,249.76 1,120.76 51.07 65.48 2,544,601.43 263,472.03 0.10 37.17 NSG_WL(1) 1,274.00 4.84 50.00 1,269.69 1,140.69 52.15 66.77 2,544,602.49 263,473.34 0.05 37.87 NSG_WL(1) 1,294.00 4.84 50.00 1,289.62 1,160.62 53.23 68.06 2,544,603.55 263,474.66 0.00 38.57 NSG_WL(1) 1,314.00 4.87 50.00 1,309.54 1,180.54 54.32 69.36 2,544,604.61 263,475.98 0.15 39.27 NSG_WL(1) 1,334.00 4.87 50.00 1,329.47 1,200.47 55.41 70.66 2,544,605.68 263,477.30 0.00 39.98 NSG_WL(1) 1,354.00 4.86 50.00 1,349.40 1,220.40 56.50 71.96 2,544,606.74 263,478.62 0.05 40.68 NSG_WL(1) 1,374.00 4.86 51.00 1,369.33 1,240.33 57.58 73.27 2,544,607.79 263,479.95 0.42 41.40 NSG_WL(1) 1,394.00 4.87 51.00 1,389.26 1,260.26 58.65 74.58 2,544,608.83 263,481.29 0.05 42.13 NSG_WL(1) 1,414.00 4.89 51.00 1,409.18 1,280.18 59.72 75.91 2,544,609.87 263482.63 0.10 42.86 NSG_WL(1) 1,434.00 4.89 51.00 1,429.11 1,300.11 60.79 77.23 2,544,610.92 263,483.98 0.00 43.60 NSG_WL(1) 1,454.00 4.90 51.00 1,449.04 1,320.04 61.87 78.56 2,544,611.97 263,485.33 0.05 44.33 NSG WL(1) 1,474.00 4.89 51.00 1,468.96 1,339.96 62.94 79.88 2,544,613.01 263,486.67 0.05 45.07 NSG_WL(1) 1,494.00 4.93 51.00 1,488.89 1,359.89 64.02 81.21 2,544,614.06 263,488.03 0.20 45.81 NSG_WL(1) 1,514.00 4.92 51.00 1,508.82 1,379.82 65.10 82.55 2,544,615.12 263,489.38 0.05 46.55 NSG_WL(1) 1,534.00 4.95 51.00 1,528.74 1,399.74 66.18 83.89 2,544,616.17 263,490.74 0.15 47.29 NSG_WL(1) 1,554.00 4.92 51.00 1,548.67 1,419.67 67.26 85.22 2,544,617.23 263,492.10 0.15 48.03 NSG_WL(1) 1,574.00 4.94 51.00 1,568.59 1,439.59 68.35 86.56 2,544,618.28 263,493.46 0.10 48.77 NSG WL(1) 1,594.00 4.95 51.00 1,588.52 1,459.52 69.43 87.90 2,544,619.34 263,494.82 0.05 49.51 NSG_WL(1) 1,614.00 4.98 51.00 1,608.45 1,479.45 70.52 89.24 2,544,620.40 263,496.18 0.15 50.26 NSG_WL(1) 1,634.00 4.97 51.00 1,628.37 1,499.37 71.61 90.59 2,544,621.47 263,497.55 0.05 51.01 NSG_WL(1) 1,654.00 4.97 51.00 1,648.29 1,519.29 72.70 91.94 2,544,622.53 263,498.92 0.00 51.76 NSG_WL(1) 1,674.00 4.97 51.00 1,668.22 1,539.22 73.79 93.28 2,544,623.59 263,500.29 0.00 52.50 NSG_WL(1) 1,694.00 5.02 51.00 1,688.14 1,559.14 74.89 94.64 2,544,624.66 263,501.67 0.25 53.25 NSG_WL(1) 1,714.00 5.00 51.00 1,708.07 1,579.07 75.99 95.99 2,544,625.73 263,503.05 0.10 54.01 NSG_WL(1) 1,734.00 5.01 51.00 1,727.99 1,598.99 77.09 97.35 2,544,626.80 263,504.42 0.05 54.76 NSG_WL(1) 1,754.00 5.04 51.00 1,747.91 1,618.91 78.19 98.71 2,544,627.88 263,505.81 0.15 55.51 NSG_WL(1) 1,774.00 5.06 51.00 1,767.84 1,638.84 79.30 100.08 2,544,628.95 263,507.20 0.10 56.27 NSG_WL(1) 1,794.00 5.09 51.00 1,787.76 1,658.76 80.41 101.46 2,544,630.04 263,508.59 0.15 57.04 NSG_WL(1) 9/19/2017 12:52:10PM Page 4 COMPASS 5000.1 Build 81D • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name 1,814.00 5.11 51.00 1,807.68 1,678.68 81.53 102.84 2,544,631.13 263,510.00 0.10 57.80 NSG_WL(1) 1,834.00 5.09 51.00 1,827.60 1,698.60 82.65 104.22 2,544,632.22 263,511.40 0.10 58.57 NSG_WL(1) 1,854.00 5.12 51.00 1,847.52 1,718.52 83.77 105.60 2,544,633.31 263,512.81 0.15 59.34 NSG_WL(1) 1,874.00 5.07 50.00 1,867.44 1,738.44 84.90 • 106.97 2,544,634.41 263,514.20 0.51 60.09 NSG_WL(1) 1,894.00 5.11 51.00 1,887.36 1,758.36 86.03 108.34 2,544,635.51 263,515.59 0.49 60.84 NSG_WL(1) 1,914.00 5.16 51.00 1,907.28 1,778.28 87.15 109.73 2,544,636.61 263,517.01 0.25 61.61 NSG_WL(1) 1,934.00 5.15 50.00 1,927.20 1,798.20 88.29 111.12 2,544,637.73 263,518.42 0.45 62.37 NSG_WL(1) 1,954.00 5.17 50.00 1,947.12 1,818.12 89.45 112.50 2,544,638.86 263,519.82 0.10 63.12 NSG_WL(1) 1,974.00 5.24 50.00 1,967.04 1,838.04 90.62 113.89 2,544,639.99 263,521.23 0.35 63.87 NSG_WL(1) , 1,994.00 5.19 50.00 1,986.96 1,857.96 91.79 115.28 2,544,641.13 263,522.65 0.25 64.63 NSG_WL(1) 2,014.00 5.22 50.00 2,006.87 1,877.87 92.95 116.67 2,544,642.27 263,524.06 0.15 65.38 NSG_WL(1) 2,034.00 5.20 50.00 2,026.79 1,897.79 94.12 118.06 2,544,643.41 263,525.47 0.10 66.13 NSG WL(1) 2,054.00 5.26 50.00 2,046.71 1,917.71 95.29 119.46 2,544,644.55 263,526.89 0.30 66.89 NSG WL(1) 2,074.00 5.24 50.00 2,066.62 1,937.62 96.47 120.86 2,544,645.70 263,528.32 0.10 67.65 NSG_WL(1) 2,094.00 5.27 50.00 2,086.54 1,957.54 97.65 122.26 2,544,646.85 263,529.75 0.15 68.41 NSG_WL(1) 2,114.00 5.26 49.00 2,106.45 1,977.45 98.84 123.66 2,544,648.01 263,531.17 0.46 69.16 NSG_WL(1) 2,134.00 5.29 50.00 2,126.37 1,997.37 100.03 125.06 2,544,649.18 263,532.59 0.48 69.91 NSG_WL(1) 2,154.00 5.32 50.00 2,146.28 2,017.28 101.22 126.47 2,544,650.34 263,534.03 0.15 70.68 NSG_WL(1) 2,174.00 5.32 50.00 2,166.20 2,037.20 102.41 127.89 2,544,651.50 263,535.47 0.00 71.45 NSG_WL(1) 2,194.00 5.32 49.00 2,186.11 2,057.11 103.62 129.30 2,544,652.68 263,536.91 0.46 72.20 NSG_WL(1) 2,214.00 5.35 50.00 2,206.03 2077.03 104.82 130.72 2,544,653.85 263,538.35 0.49 72.96 NSG_WL(1) 2,234.00 5.32 50.00 2,225.94 2,096.94 106.02 132.14 2,544,655.02 263,539.79 0.15 73.73 NSG_WL(1) 2,254.00 5.30 50.00 2,245.85 2,116.85 107.21 133.56 2,544,656.18 263,541.24 0.10 74.50 NSG_WL(1) 2,274.00 5.28 50.00 2,265.77 2,136.77 108.39 134.97 2,544,657.34 263,542.67 0.10 75.27 NSG_WL(1) 2,294.00 5.31 50.00 2,285.68 2,156.68 109.58 136.39 2,544,658.49 263,544.11 0.15 76.03 NSG_WL(1) . 2,314.00 5.35 50.00 2,305.60 2,176.60 110.77 137.81 2,544,659.66 263545.56 0.20 76.81 NSG_WL(1) 2,334.00 5.36 50.00 2,325.51 2,196.51 111.97 139.24 2,544,660.83 263,547.01 0.05 77.58 NSG_WL(1) 2,354.00 5.34 50.00 2,345.42 2,216.42 113.17 140.67 2,544,662.00 263,548.46 0.10 78.36 NSG_WL(1) 2,374.00 5.35 50.00 2,365.33 2,236.33 114.37 142.09 2,544,663.17 263,549.91 0.05 79.13 NSG_WL(1) 2,394.00 5.37 50.00 2,385.25 2,256.25 115.57 143.53 2,544,664.34 263,551.37 0.10 79.91 NSG_WL(1) 2,414.00 5.39 50.00 2,405.16 2,276.16 116.78 144.96 2,544,665.51 263,552.83 0.10 80.68 NSG_WL(1) 2,434.00 5.42 50.00 2,425.07 2,296.07 117.99 146.41 2,544,666.70 263,554.30 0.15 81.47 NSG_WL(1) 2,454.00 5.45 50.00 2,444.98 2,315.98 119.21 147.86 2,544,667.88 263,555.77 0.15 82.25 NSG_WL(1) 2,474.00 5.42 50.00 2,464.89 2,335.89 120.42 149.31 2,544,669.07 263,557.25 0.15 83.04 NSG_WL(1) 2,494.00 5.42 50.00 2,484.80 2,355.80 121.64 150.75 2,544,670.26 263,558.72 0.00 83.82 NSG_WL(1) 2,514.00 5.44 50.00 2,504.71 2,375.71 122.85 152.20 2544,671.44 263,560.19 0.10 84.61 NSG_WL(1) 2,534.00 5.47 50.00 2,524.62 2,395.62 124.08 153.66 2,544,672.64 263,561.67 0.15 85.40 NSG_WL(1) 2,554.00 5.47 50.00 2,544.53 2,415.53 125.30 155.12 2,544,673.83 263,563.16 0.00 86.19 NSG_WL(1) 2,574.00 5.45 50.00 2,564.44 2,435.44 126.52 156.58 2,544,675.02 263,564.64 0.10 86.98 NSG_WL(1) 2,594.00 5.46 50.00 2,584.35 2,455.35 127.75 158.04 2,544,676.22 263,566.12 0.05 87.77 NSG_WL(1) 9/19/2017 12:52:10PM Page 5 COMPASS 5000.1 Build 810 . Halliburton Definitive Survey Report • Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 ki Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°I100') (ft) Survey Tool Name 2,614.00 5.49 50.00 2,604.26 2,475.26 128.97 159.50 2,544,677.41 263,567.61 0.15 88.56 NSG_WL(1) 2,634.00 5.48 50.00 2,624.16 2,495.16 130.20 160.96 2,544,678.61 263,569.10 0.05 89.36 NSG_WL(1) 2,654.00 5.48 50.00 2,644.07 2,515.07 131.43 162.42 2,544,679.81 263,570.59 0.00 90.15 NSG_WL(1) 2,674.00 5.50 50.00 2,663.98 2,534.98 132.66 163.89 2544,681.01 263,572.08 0.10 90.95 NSG_WL(1) 2,694.00 5.50 50.00 2,683.89 2,554.89 133.89 165.36 2544,682.21 263,573.57 0.00 91.74 NSG_WL(1) 2,714.00 5.49 49.00 2,703.80 2,574.80 135.14 166.82 2,544,683.43 263,575.05 0.48 92.52 NSG_WL(1) 2,734.00 5.50 50.00 2,723.71 2,594.71 136.38 168.27 2,544,684.64 263,576.53 0.48 93.30 NSG_WL(1) 2,754.00 5.51 49.00 2,743.61 2,614.61 137.63 169.73 2,544,685.86 263,578.02 0.48 94.08 NSG_WL(1) 2,774.00 5.53 49.00 2,763.52 2,634.52 138.89 171.18 2,544,687.09 263,579.49 0.10 94.85 NSG_WL(1) 2,794.00 5.52 49.00 2,783.43 2,654.43 140.15 172.64 2,544,688.32 263,580.97 0.05 95.62 NSG_WL(1) 2,814.00 5.55 49.00 2,803.33 2,674.33 141.42 174.09 2,544,689.56 263,582.45 0.15 96.39 NSG_WL(1) 2,834.00 5.53 49.00 2,823.24 2,694.24 142.68 175.55 2,544,690.79 263,583.94 0.10 97.16 NSG_WL(1) 2,854.00 5.53 49.00 2,843.15 2,714.15 143.95 177.00 2,544,692.03 263,585.42 0.00 97.93 NSG_WL(1) 2,874.00 5.47 50.00 2,863.06 2,734.06 145.19 178.46 2,544,693.24 263,586.90 0.57 98.71 NSG_WL(1) 2,894.00 5.49 50.00 2,882.96 2,753.96 146.42 179.92 2,544,694.44 263,588.39 0.10 99.51 NSG_WL(1) 2,914.00 5.46 50.00 2,902.87 2,773.87 147.65 181.39 2,544,695.64 263,589.87 0.15 100.30 NSG_WL(1) 2,934.00 5.46 50.00 2,922.78 2,793.78 148.87 182.84 2,544,696.83 263,591.35 0.00 101.09 NSG_WL(1) 2,954.00 5.50 51.00 2,942.69 2,813.69 150.08 184.32 2,544,698.02 263,592.85 0.52 101.90 NSG_WL(1) 2,974.00 5.48 50.00 2,962.60 2,833.60 151.30 185.79 2,544,699.20 263,594.35 0.49 102.71 NSG_WL(1) 2,994.00 5.46 50.00 2,982.51 2,853.51 152.53 187.25 2,544,700.40 263,595.84 0.10 103.50 NSG_WL(1) 3,014.00 5.45 50.00 3,002.42 2,873.42 153.75 188.71 2,544,701.59 263,597.32 0.05 104.29 NSG_WL(1) 3,034.00 5.46 50.00 3,022.33 2,893.33 154.97 190.17 2,544,702.78 263,598.80 0.05 105.08 NSG_WL(1) 3,054.00 5.48 50.00 3,042.24 2,913.24 156.20 191.63 2,544,703.98 263,600.28 0.10 105.87 NSG_WL(1) 3,074.00 5.42 50.00 3,062.15 2,933.15 157.42 193.08 2,544,705.17 263,601.76 0.30 106.66 NSG_WL(1) 3,094.00 5.46 50.00 3,082.06 2,953.06 158.64 194.54 2,544,706.36 263,603.24 0.20 107.45 NSG_WL(1) 3,114.00 5.44 51.00 3,101.97 2,972.97 159.85 196.00 2,544,707.54 263,604.73 0.49 108.25 NSG_WL(1) 3,134.00 5.43 50.00 3,121.88 2,992.88 161.05 197.46 2,544,708.71 263,606.22 0.48 109.05 NSG_WL(1) 3,154.00 5.43 50.00 3,141.79 3,012.79 162.27 198.91 2,544,709.90 263,607.69 0.00 109.84 NSG_WL(1) 3,174.00 5.43 51.00 3,161.70 3,032.70 163.47 200.37 2,544,711.07 263,609.18 0.47 110.64 NSG_WL(1) 3,194.00 5.34 51.00 3,181.61 3,052.61 164.65 201.83 2,544,712.22 263,610.66 0.45 111.45 NSG_WL(1) 3,214.00 5.33 51.00 3,201.52 3,072.52 165.82 203.28 2,544,713.36 263,612.13 0.05 112.25 NSG_WL(1) 3,234.00 5.33 52.00 3,221.43 3,092.43 166.98 204.73 2,544,714.49 263,613.60 0.46 113.07 NSG_WL(1) 3,254.00 5.36 52.00 3,241.35 3,112.35 168.13 206.20 2,544,715.61 263,615.09 0.15 113.90 NSG_WL(1) 3,274.00 5.33 52.00 3,261.26 3,132.26 169.27 207.67 2,544,716.72 263,616.59 0.15 114.73 NSG_WL(1) 3,294.00 5.30 53.00 3,281.17 3,152.17 170.40 209.14 2,544,717.82 263,618.08 0.49 115.57 NSG_WL(1) 3,314.00 5.30 53.00 3,301.09 3,172.09 171.51 210.61 2,544,718.90 263,619.58 0.00 116.43 NSG_WL(1) 3,334.00 5.32 53.00 3,321.00 3,192.00 172.63 212.09 2,544,719.99 263,621.08 0.10 117.28 NSG_WL(1) 3,354.00 5.34 53.00 3,340.92 3,211.92 173.74 213.57 2,544,721.07 263,622.58 0.10 118.14 NSG_WL(1) 3,374.00 5.26 53.00 3,360.83 3,231.83 174.86 215.05 2,544,722.16 263,624.08 0.40 119.00 NSG_WL(1) 3,394.00 5.23 53.00 3,380.75 3,251.75 175.96 216.51 2,544,723.23 263,625.56 0.15 119.84 NSG_WL(1) 9/19/2017 12:52:10PM Page 6 COMPASS 5000.1 Build 81D . HalliburtonIII Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 3,414.00 5.21 53.00 3,400.66 3,271.66 177.05 217.96 2,544,724.29 263,627.04 0.10 120.68 NSG_WL(1) 3,434.00 5.26 53.00 3,420.58 3,291.58 178.15 219.42 2,544,725.36 263,628.52 0.25 121.53 NSG_WL(1) 3,454.00 5.24 54.00 3,440.50 3,311.50 179.24 220.89 2,544,726.42 263,630.01 0.47 122.39 NSG_WL(1) 3,474.00 5.25 54.00 3,460.41 3,331.41 180.31 222.37 2,544,727.46 263,631.51 0.05 123.26 NSG_WL(1) 3,494.00 5.24 54.00 3,480.33 3,351.33 181.39 223.85 2,544,728.51 263,633.01 0.05 124.14 NSG_WL(1) 3,514.00 5.20 54.00 3,500.25 3,371.25 182.46 225.32 2,544,729.55 263,634.50 0.20 125.00 NSG_WL(1) 3,534.00 5.16 54.00 3,520.17 3,391.17 183.52 226.78 2,544,730.58 263,635.99 0.20 125.87 NSG_WL(1) 3,554.00 5.17 54.00 3,540.08 3,411.08 184.58 228.24 2,544,731.61 263,637.46 0.05 126.73 NSG_WL(1) 3,574.00 5.16 54.00 3,560.00 3,431.00 185.63 229.70 2,544,732.63 263,638.94 0.05 127.59 NSG_WL(1) 3,594.00 5.17 54.00 3,579.92 3,450.92 186.69 231.15 2,544,733.66 263,640.42 0.05 128.45 NSG_WL(1) 3,614.00 5.18 55.00 3,599.84 3,470.84 187.74 232.62 2,544,734.68 263,641.91 0.45 129.32 NSG_WL(1) 3,634.00 5.13 55.00 3,619.76 3,490.76 188.77 234.09 2,544,735.68 263,643.40 0.25 130.21 NSG_WL(1) 3,654.00 5.13 55.00 3,639.68 3,510.68 189.80 235.56 2,544,736.68 263,644.89 0.00 131.09 NSG_WL(1) 3,674.00 5.10 55.00 3,659.60 3,530.60 190.82 237.02 2,544,737.67 263,646.37 0.15 131.97 NSG_WL(1) 3,694.00 5.07 55.00 3,679.52 3,550.52 191.84 238.47 2,544,738.66 263,647.84 0.15 132.84 NSG_WL(1) 3,714.00 5.08 55.00 3,699.44 3,570.44 192.85 239.92 2,544,739.64 263,649.31 0.05 133.72 NSG_WL(1) 3,734.00 5.04 55.00 3,719.36 3,590.36 193.86 241.36 2,544,740.62 263,650.77 0.20 134.59 NSG_WL(1) 3,754.00 4.97 55.00 3,739.29 3,610.29 194.86 242.79 2,544,741.60 263,652.22 0.35 135.45 NSG_WL(1) 3,774.00 4.96 54.00 3,759.21 3,630.21 195.87 244.20 2,544,742.57 263,653.65 0.44 136.29 NSG_WL(1) 3,794.00 4.89 54.00 3,779.14 3,650.14 196.88 245.59 2,544,743.55 263,655.06 0.35 137.11 NSG_WL(1) 3,814.00 4.89 53.00 3,799.07 3,670.07 197.89 246.96 2,544,744.54 263,656.45 0.43 137.91 NSG_WL(1) 3,834.00 4.87 53.00 3,818.99 3,689.99 198.92 248.32 2,544,745.53 263,657.83 0.10 138.70 NSG_WL(1) 3,854.00 4.86 52.00 3,838.92 3,709.92 199.95 249.67 2,544,746.54 263,659.20 0.43 139.47 NSG_WL(1) 3,874.00 4.89 52.00 3,858.85 3,729.85 200.99 251.01 2,544,747.56 263,660.56 0.15 140.23 NSG_WL(1) 3,894.00 4.89 52.00 3,878.78 3,749.78 202.04 252.35 2,544,748.58 263,661.92 0.00 140.99 NSG_WL(1) 3,914.00 4.83 52.00 3,898.70 3,769.70 203.09 253.68 2,544,749.60 263,663.28 0.30 141.74 NSG_WL(1) 3,934.00 4.78 51.00 3,918.63 3,789.63 204.13 255.00 2,544,750.61 263,664.61 0.49 142.48 NSG_WL(1) 3,954.00 4.78 51.00 3,938.57 3,809.57 205.18 256.29 2,544,751.63 263,665.93 0.00 143.20 NSG_WL(1) 3,974.00 4.72 50.00 3,958.50 3,829.50 206.23 257.57 2,544,752.66 263,667.23 0.51 143.90 NSG_WL(1) 3,994.00 4.68 50.00 3,978.43 3,849.43 207.29 258.82 2,544,753.69 263,668.50 0.20 144.58 NSG_WL(1) 4,014.00 4.63 49.00 3,998.36 3,869.36 208.34 260.06 2,544,754.72 263,669.76 0.48 145.24 NSG_WL(1) 4,034.00 4.72 47.00 4,018.30 3,889.30 209.43 261.27 2,544,755.78 263,670.99 0.93 145.87 NSG_WL(1) 4,054.00 4.82 49.00 4,038.23 3,909.23 210.54 262.51 2,544,756.87 263,672.25 0.97 146.50 NSG_WL(1) 4,074.00 4.86 49.00 4,058.16 3,929.16 211.65 263.78 2,544,757.95 263,673.54 0.20 147.18 NSG_WL(1) 4,094.00 4.85 50.00 4,078.08 3,949.08 212.75 265.07 2,544,759.03 263,674.85 0.43 147.87 NSG_WL(1) 4,114.00 4.91 52.00 4,098.01 3,969.01 213.82 266.39 2,544,760.07 263,676.20 0.90 148.60 NSG_WL(1) 4,134.00 5.00 53.00 4,117.94 3,988.94 214.87 267.76 2,544,761.09 263,677.59 0.62 149.39 NSG_WL(1) 4,154.00 5.08 55.00 4,137.86 4,008.86 215.90 269.18 2,544,762.09 263,679.03 0.97 150.23 NSG_WL(1) 4,174.00 5.08 58.00 4,157.78 4,028.78 216.88 270.66 2,544,763.04 263,680.53 1.33 151.14 NSG_WL(1) 4,194.00 4.94 60.00 4,177.70 4,048.70 217.78 272.15 2,544,763.91 263,682.04 1.12 152.10 NSG_WL(1) 9/19/2017 12:52:10PM Page 7 COMPASS 5000.1 Build 81D • •Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True 1 Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +Ei-W Northing Easting DLS Section (usft) (°) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°l100') (ft) Survey Tool Name 4,214.00 4.66 62.00 4,197.63 4,068.63 218.59 273.62 2,544,764.69 263,683.52 1.63 153.08 NSG_WL(1) 4,234.00 4.47 67.00 4,217.57 4,088.57 219.28 275.05 2,544,765.35 263,684.97 2.20 154.08 NSG_WL(1) 4,254.00 4.39 68.00 4,237.51 4,108.51 219.87 276.48 2,544,765.91 263,686.41 0.56 155.11 NSG_WL(1) 4,274.00 4.40 69.00 4,257.45 4,128.45 220.43 277.90 2,544,766.44 263,687.84 0.39 156.16 NSG_WL(1) 4,294.00 4.38 70.00 4,277.39 4,148.39 220.97 279.34 2,544,766.95 263,689.29 0.40 157.22 NSG_WL(1) 4,314.00 4.50 71.00 4,297.33 4,168.33 221.48 280.80 2,544,767.44 263,690.76 0.71 158.32 NSG_WL(1) 4,334.00 4.44 71.00 4,317.27 4,188.27 221.99 282.27 2,544,767.92 263,692.24 0.30 159.43 NSG_WL(1) 4,354.00 4.37 71.00 4,337.21 4,208.21 222.49 283.72 2,544,768.39 263,693.70 0.35 160.52 NSG_WL(1) 4,374.00 4.36 71.00 4,357.16 4,228.16 222.99 285.16 2,544,768.85 263,695.15 0.05 161.61 NSG_WL(1) 4,394.00 4.36 71.00 4,377.10 4,248.10 223.48 286.60 2,544,769.32 263,696.60 0.00 162.70 NSG_WL(1) 4,414.00 4.36 72.00 4,397.04 4,268.04 223.97 288.04 2,544,769.77 263,698.05 0.38 163.79 NSG_WL(1) 4,434.00 4.29 72.00 4,416.98 4,287.98 224.43 289.48 2,544,770.21 263,699.50 0.35 164.89 NSG_WL(1) 4,454.00 4.37 72.00 4,436.93 4,307.93 224.90 290.91 2,544,770.65 263,700.94 0.40 165.98 NSG_WL(1) 4,474.00 4.47 72.00 4,456.87 4,327.87 225.37 292.38 2,544,771.09 263,702.42 0.50 167.10 NSG_WL(1) 4,494.00 4.43 72.00 4,476.81 4,347.81 225.85 293.85 2,544,771.54 263,703.90 0.20 168.23 NSG_WL(1) 4,514.00 4.28 72.00 4,496.75 4,367.75 226.32 295.30 2,544,771.98 263,705.36 0.75 169.33 NSG_WL(1) 4,534.00 4.33 72.00 4,516.69 4,387.69 226.79 296.73 2,544,772.42 263,706.79 0.25 170.42 NSG_WL(1) 4,554.00 4.22 72.00 4,536.64 4,407.64 227.25 298.14 2,544,772.85 263,708.22 0.55 171.50 NSG_WL(1) 4,574.00 4.15 72.00 4,556.58 4,427.58 227.70 299.53 2,544,773.27 263,709.62 0.35 172.56 NSG_WL(1) 4,594.00 4.22 71.00 4,576.53 4,447.53 228.16 300.92 2,544,773.71 263,711.01 0.51 173.61 NSG_WL(1) 4,614.00 4.19 71.00 4,596.48 4,467.48 228.64 302.30 2,544,774.15 263,712.41 0.15 174.66 NSG_WL(1) 4,634.00 4.24 72.00 4,616.42 4,487.42 229.11 303.70 2,544,774.59 263,713.81 0.44 175.72 NSG_WL(1) 4,654.00 4.14 71.00 4,636.37 4,507.37 229.57 305.08 2,544,775.03 263,715.20 0.62 176.77 NSG_WL(1) 4,674.00 4.03 70.00 4,656.32 4,527.32 230.04 306.43 2,544,775.48 263,716.56 0.66 177.78 NSG_WL(1) 4,694.00 4.07 71.00 4,676.27 4,547.27 230.52 307.76 2,544,775.92 263,717.90 0.41 178.78 NSG_WL(1) 4,714.00 4.28 71.00 4,696.21 4,567.21 230.99 309.13 2,544,776.37 263,719.28 1.05 179.81 NSG_WL(1) 4,734.00 4.29 72.00 4,716.16 4,587.16 231.46 310.55 2,544,776.81 263,720.71 0.38 180.89 NSG_WL(1) 4,754.00 4.22 72.00 4,736.10 4,607.10 231.92 311.96 2,544,777.24 263,722.13 0.35 181.97 NSG_WL(1) 4,774.00 4.03 72.00 4,756.05 4,627.05 232.37 313.33 2,544,777.66 263,723.51 0.95 183.01 NSG_WL(1) 4,794.00 3.97 71.00 4,776.00 4,647.00 232.81 314.65 2,544,778.07 263,724.84 0.46 184.02 NSG_WL(1) . 4,814.00 3.96 71.00 4,795.96 4,666.96 233.26 315.96 2,544,778.50 263,726.15 0.05 185.00 NSG_WL(1) 4,834.00 4.09 69.00 4,815.91 4,686.91 233.74 317.28 2,544,778.95 263,727.48 0.96 185.99 NSG_WL(1) 4,854.00 3.97 68.00 4,835.86 4,706.86 234.26 318.59 2,544,779.44 263,728.80 0.70 186.95 NSG_WL(1) 4,874.00 3.81 69.00 4,855.81 4,726.81 234.75 319.85 2,544,779.91 263,730.07 0.87 187.87 NSG_WL(1) 4,894.00 3.83 70.00 4,875.77 4,746.77 235.22 321.10 2,544,780.35 263,731.33 0.35 188.80 NSG_WL(1) 4,914.00 3.90 70.00 4,895.72 4,766.72 235.68 322.37 2,544,780.79 263,732.61 0.35 189.74 NSG_WL(1) 4,934.00 3.87 69.00 4,915.67 4,786.67 236.16 323.63 2,544,781.24 263,733.88 0.37 190.69 NSG_WL(1) 4,954.00 3.92 68.00 4,935.63 4,806.63 236.65 324.90 2,544,781.71 263,735.16 0.42 191.61 NSG_WL(1) 4,974.00 3.87 68.00 4,955.58 4,826.58 237.16 326.16 2,544,782.19 263,736.43 0.25 192.53 NSG_WL(1) 4,994.00 3.89 68.00 4,975.54 4,846.54 237.67 327.41 2,544,782.67 263,737.69 0.10 193.45 NSG_WL(1) 9/19/2017 12.52.10PM Page 8 COMPASS 5000.1 Build 81D SHalliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC 1 Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point t TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) # Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 5,014.00 3.80 69.00 4,995.49 4,866.49 238.16 328.66 2,544,783.14 263,738.95 0.56 194.36 NSG_WL(1) 5,034.00 3.80 68.00 5,015.45 4,886.45 ' 238.65 329.89 2,544,783.60 263,740.19 0.33 195.27 NSG_WL(1) 5,054.00 3.98 67.00 5,035.40 4,906.40 239.17 331.15 2,544,784.09 263,741.46 0.96 196.18 NSG_W1_(1) 5,074.00 3.95 66.00 5,055.35 4,926.35 239.72 332.42 2,544,784.62 263,742.73 0.38 197.08 NSG_VVL(1) 5,094.00 3.94 66.00 5,075.31 4,946.31 240.28 333.67 2,544,785.15 263,744.00 0.05 197.98 NSG_WL(1) 5,114.00 3.95 65.00 5,095.26 4,966.26 240.85 334.92 2,544,785.70 263,745.27 0.35 198.86 NSG WL(1) 5,134.00 3.97 66.00 5,115.21 4,986.21 241.42 336.18 2,544,786.24 263,746.53 0.36 199.75 NSG_WL(1) 5,154.00 4.00 66.00 5,135.16 5,006.16 241.99 337.45 2,544,786.78 263,747.82 0.15 200.65 NSG_WL(1) 5,174.00 3.96 66.00 5,155.11 5,026.11 242.55 338.72 2,544,787.32 263,749.09 0.20 201.56 NSG_WL(1) 5,194.00 4.05 68.00 5,175.07 5,046.07 243.10 340.01 2,544,787.84 263,750.39 0.83 202.48 NSG_WL(1) 5,214.00 4.14 68.00 5,195.01 5,066.01 243.63 341.33 2,544,788.35 263,751.73 0.45 203.45 NSG_WL(1) 5,234.00 4.10 68.00 5,214.96 5,085.96 244.17 342.66 2,544,788.86 263,753.07 0.20 204.42 NSG_1ML(1) 5,254.00 4.08 68.00 5,234.91 5,105.91 244.70 343.98 2,544,789.37 263,754.40 0.10 205.39 NSG_WL(1) 5,274.00 4.09 68.00 5,254.86 5,125.86 245.24 345.31 2,544,789.87 263,755.73 0.05 206.35 NSG_WL(1) 5,294.00 4.15 68.00 5,274.81 5,145.81 245.78 346.64 2,544,790.39 263,757.08 0.30 207.32 NSG_WL(1) 5,314.00 4.03 68.00 5,294.76 5,165.76 246.31 347.96 2,544,790.89 263,758.41 0.60 208.28 NSG_WL(1) 5,334.00 3.92 66.00 5,314.71 5,185.71 246.85 349.24 2,544,791.41 263,759.70 0.88 209.20 NSG_WL(1) 5,354.00 3.85 65.00 5,334.66 5,205.66 247.41 350.47 2,544,791.95" 263,760.94 0.49 210.08 NSG_WL(1) 5,374.00 3.85 64.00 5,354.62 5,225.62 247.99 351.68 2,544,792.50 263,762.16 0.34 210.92 NSG_WL(1) 5,394.00 4.00 62.00 5,374.57 5,245.57 248.61 352.90 2,544,793.10 263,763.40 1.02 211.76 NSG_WL(1) 5,414.00 3.91 61.00 5,394.52 5,265.52 249.27 354.11 2,544,793.73 263,764.62 0.57 212.57 NSG_WL(1) 5,434.00 3.99 61.00 5,414.48 5,285.48 249.94 355.32 2,544,794.37 263,765.84 0.40 213.37 NSG_WL(1) 5,454.00 4.10 62.00 5,434.43 5,305.43 250.61 356.56 2,544,795.02 263,767.09 0.65 214.20 NSG_WL(1) 5,474.00 4.04 63.00 5,454.38 5,325.38 251.27 357.82 2,544,795.65 263,768.36 0.46 215.05 NSG_WL(1) 5,494.00 4.02 60.00 5,474.33 5,345.33 251.94 359.05 2,544,796.29 263,769.61 1.06 215.88 NSG_WL(1) 5,514.00 4.08 61.00 5,494.28 5,365.28 252.63 360.28 2,544,796.96 263,770.86 0.46 216.69 NSG_WL(1) 5,534.00 •3.95 61.00 5,514.23 5,385.23 253.31 361.51 2,544,797.62 263,772.09 0.65 217.50 NSG_WL(1) 5,554.00 3.83 58.00 5,534.18 5,405.18 254.00 362.67 2,544,798.28 263,773.28 1.18 218.26 NSG_WL(1) 5,574.00 3.80 57.00 5,554.14 5,425.14 254.71 363.80 2,544,798.97 263,774.41 0.36 218.97 NSG_WL(1) 5,594.00 3.80 56.00 5,574.09 5,445.09 255.45 364.90 2,544,799.68 263,775.53 0.33 219.65 NSG_WL(1) 5,614.00 3.81 55.00 5,594.05 5,465.05 256.20 366.00 2,544,800.41 263,776.64 0.34 220.32 NSG_WL(1) 5,634.00 3.81 54.00 5,614.01 5,485.01 256.97 367.08 2,544,801.16 263,777.74 0.33 220.96 NSG_W1.(1) 5,654.00 3.82 54.00 5,633.96 5,504.96 257.75 368.15 2,544,801.92 263,778.83 0.05 221.60 NSG_WL(1) 5,674.00 3.79 53.00 5,653.92 5,524.92 258.54 369.22 2,544,802.69 263,779.91 0.36 222.22 NSG_WL(1) I 5,694.00 3.79 52.00 5,673.87 5,544.87 259.35 370.27 2,544,803.47 263,780.98 0.33 222.82 NSG_WL(1) 5,714.00 3.78 50.00 5,693.83 5,564.83 260.18 371.30 2,544,804.28 263,782.02 0.66 223.39 NSG_WL(1) 5,734.00 3.83 50.00 5,713.79 5,584.79 261.03 372.31 2,544,805.12 263,783.06 0.25 223.94 NSG_WL(2) 5,754.00 3.85 50.00 5,733.74 5,604.74 261.89 373.34 2,544,805.96 263,784.10 0.10 224.50 NSG_WL(2) 5,774.00 3.82 50.00 5,753.70 5,624.70 262.75 374.36 2,544,806.79 263,785.14 0.15 225.06 NSG_WL(2) 5,794.00 3.90 48.00 5,773.65 5,644.65 263.63 375.38 2,544,807.66 263,786.17 0.78 225.59 NSG_WL(2) 9/19/2017 12:52:10PM Page 9 COMPASS 5000.1 Build 81D • Halliburton Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point ! TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform t MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey I Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) ys (usft) (ft) (ft) (°/100) (ft) Survey Tool Name tt 5,814.00 4.14 48.00 5,793.60 5,664.60 264.57 376.42 2,544,808.57 263,787.23 1.20 226.13 NSG_WL(2) 5,834.00 4.49 50.00 5,813.55 5,684.55 265.56 377.56 2,544,809.54 263,788.39 1.90 226.73 NSG_WL(2) 5,854.00 5.24 54.00 5,833.47 5,704.47 266.60 378.90 2,544,810.55 263,789.75 4.11 227.49 NSG_WL(2) 5,874.00 6.39 57.00 5,853.37 5,724.37 267.74 380.57 2,544,811.66 263,791.45 5.95 228.51 NSG_WL(2) 5,894.00 7.55 59.00 5,873.22 5,744.22 269.02 382.63 2,544,812.90 263,793.53 5.92 229.82 NSG_WL(2) 5,914.00 8.19 60.00 5,893.03 5,764.03 270.41 384.99 2,544,814.24 263,795.92 3.27 231.35 NSG_WL(2) 5,934.00 8.35 60.00 5,912.83 5,783.83 271.85 387.48 2,544,815.63 263,798.44 0.80 232.99 NSG_WL(2) 5,954.00 8.39 61.00 5,932.61 5,803.61 273.29 390.01 2,544,817.01 263,801.00 0.75 234.66 NSG_WL(2) 5,974.00 8.41 61.00 5,952.40 5,823.40 274.70 392.57 2,544,818.37 263,803.58 0.10 236.36 NSG_WL(2) 5,994.00 8.41 61.00 5,972.18 5,843.18 276.12 395.13 2,544,819.74 263,806.17 0.00 238.06 NSG_WL(2) 6,014.00 8.52 61.00 5,991.96 5,862.96 277.55 397.70 2,544,821.11 263,808.77 0.55 239.77 NSG_WL(2) 6,034.00 8.68 61.00 6,011.74 5,882.74 279.00 400.32 2,544,822.51 263,811.42 0.80 241.51 NSG_WL(2) 6,054.00 8.67 61.00 6,031.51 5,902.51 280.46 402.96 2,544,823.92 263,814.09 0.05 243.26 NSG_WL(2) 6,074.00 8.61 62.00 6,051.28 5,922.28 281.89 405.60 2,544,825.30 263,816.75 0.81 245.03 NSG_WL(2) 6,094.00 8.55 62.00 6,071.06 5,942.06 283.29 408.23 2,544,826.64 263,819.42 0.30 246.80 NSG_WL(2) 6,114.00 8.45 62.00 6,090.84 5,961.84 284.68 410.84 .2,544,827.98 263,822.05 0.50 248.56 NSG_W1 (2) 6,134.00 8.34 62.00 6,110.63 5,981.63 286.05 413.42 2,544,829.30 263,824.66 0.55 250.30 NSG_WL(2) 6,154.00 8.30 62.00 6,130.42 6,001.42 287.41 415.97 2,544,830.60 263,827.24 0.20 252.02 NSG_WL(2) 6,174.00 8.16 62.00 6,150.21 6,021.21 288.76 418.50 2,544,831.90 263,829.80 0.70 253.73 NSG_WL(2) 6,194.00 8.03 62.00 6,170.01 6,041.01 290.08 420.99 2,544,833.17 263,832.31 0.65 255.41 NSG_WL(2) 6,214.00 7.99 61.00 6,189.82 6,060.82 291.41 423.44 2,544,834.45 263,834.79 0.72 257.05 NSG_WL(2) 6,234.00 7.89 61.00 6,209.62 6,080.62 292.75 425.85 2,544,835.74 263,837.23 0.50 258.65 NSG_WL(2) 6,254.00 7.64 61.00 6,229.44 6,100.44 294.06 428.22 2,544,837.00 263,839.62 1.25 260.22 NSG_WL(2) 6,274.00 7.40 60.00 6,249.27 6,120.27 295.35 430.50 2,544,838.24 263,841.92 1.37 261.73 NSG_WL(2) 6,294.00 7.38 60.00 6,269.10 6,140.10 296.63 432.72 2,544,839.48 263,844.17 0.10 263.18 NSG_W1 (2) 6,314.00 7.25 60.00 6,288.94 6,159.94 297.90 434.93 2,544,840.71 263,846.41 0.65 264.63 NSG_WL(2) 6,334.00 6.94 60.00 6,308.79 6,179.79 299.14 437.07 2,544,841.90 263,848.57 1.55 266.03 NSG_WL(2) 6,354.00 6.77 58.00 6,328.64 6,199.64 300.37 439.11 2,544,843.09 263,850.64 1.47 267.35 NSG_WL(2) 6,374.00 6.78 58.00 6,348.50 6,219.50 301.62 441.12 2,544,844.30 263,852.67 0.05 268.62 NSG_WL(2) 6,394.00 6.67 58.00 6,368.37 6,239.37 302.86 443.10 2,544,845.50 263,854.68 0.55 269.88 NSG_WL(2) 6,414.00 6.49 57.00 6,388.23 6,259.23 304.09 445.03 2,544,846.69 263,856.63 1.07 271.09 NSG_WL(2) 6,434.00 6.44 56.00 6,408.11 6,279.11 305.33 446.91 2,544,847.89 263,858.54 0.62 272.25 NSG_WL(2) 6,454.00 6.32 56.00 6,427.98 6,298.98 306.58 448.76 2,544,849.10 263,860.40 0.60 273.38 NSG_WL(2) 6,474.00 6.22 56.00 6,447.86 6,318.86 307.80 450.57 2,544,850.28 263,862.24 0.50 274.49 NSG_WL(2) 6,494.00 5.95 55.00 6,467.75 6,338.75 309.00 452.31 2,544,851.45 263,864.01 1.45 275.55 NSG_WL(2) 6,514.00 5.73 54.00 6,487.65 6,358.65 310.18 453.97 2,544,852.60 263,865.69 1.21 276.54 NSG_WL(2) 6,534.00 5.69 54.00 6,507.55 6,378.55 311.35 455.58 2,544,853.73 263,867.32 0.20 277.49 NSG_WL(2) 6,554.00 5.64 53.00 6,527.45 6,398.45 312.52 457.17 2,544,854.87 263,868.93 0.55 278.42 NSG_WL(2) 6,574.00 5.47 53.00 6,547.36 6,418.36 313.69 458.71 2,544,856.01 263,870.50 0.85 279.32 NSG_WL(2) 6,594.00 5.35 52.00 6,567.27 6,438.27 314.84 460.21 2,544,857.12 263,872.02 0.76 280.17 NSG_WL(2) 9/192017 12:52:10PM Page 10 COMPASS 5000.1 Build 81D 0 Halliburton Definitive Survey Report • Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name , : 6,614.00 5.23 51.00 6,587.18 6,458.18 315.98 461.65 2,544,858.24 263,873.49 0.76 280.98 NSG_WL(2) 6,634.00 5.14 49.00 6,607.10 6,478.10 317.15 463.04 2,544,859.38 263,874.90 1.01 281.73 NSG_WL(2) 6,654.00 5.07 49.00 6,627.02 6,498.02 318.31 464.38 2,544,860.52 263,876.26 0.35 282.45 NSG_WL(2) 6,752.00 9.34 71.72 6,724.24 6,595.24 323.65 475.21 2,544,865.63 263,887.20 5.16 289.92 MWD(3) 6,846.00 12.40 75.27 6,816.55 6,687.55 328.61 492.21 2,544,870.25 263,904.30 3.33 303.15 MWD(3) 6,941.00 15.00 78.05 6,908.84 6,779.84 333.75 514.11 2,544,874.94 263,926.30 2.82 320.71 MWD(3) 7,035.00 17.09 75.81 6,999.17 6,870.17 339.66 539.40 2,544,880.33 263,951.70 2.32 341.01 MWD(3) 7,128.00 19.82 79.10 7,087.38 6,958.38 345.99 568.14 2,544,886.08 263,980.56 3.14 364.23 MWD(3) 7,221.00 22.08 82.87 7,174.23 7,045.23 351.14 600.97 2,544,890.56 264,013.49 2.83 391.66 MWD(3) 7,315.00 23.96 85.84 7,260.75 7,131.75 354.72 637.54 2,544,893.40 264,050.13 2.35 423.14 MWD(3) 7,410.00 25.90 86.14 7,346.89 7,217.89 357.52 677.49 2,544,895.38 264,090.12 2.05 458.01 MWD(3) 7,503.00 28.00 89.35 7,429.79 7,300.79 359.13 719.59 2,544,896.14 264,132.24 2.75 495.32 MWD(3) 7,598.00 30.61 91.52 7,512.63 7,383.63 358.74 766.08 2,544,894.81 264,178.71 2.97 537.46 MWD(3) 7,691.00 33.90 92.28 7,591.27 7,462.27 357.08 815.67 2,544,892.14 264,228.26 3.56 582.96 MWD(3) 7,784.00 36.62 92.30 7,667.20 7,538.20 354.94 869.31 2,544,888.90 264,281.84 2.92 632.31 MWD(3) 7,880.00 40.42 92.38 7,742.29 7,613.29 352.49 929.04 2,544,885.25 264,341.51 3.96 687.29 MWD(3) 7,975.00 42.53 93.07 7.813.47 7,684.47 349.50 991.88 2,544,880.98 264,404.27 2.27 745.31 MWD(3) 8,071.00 45.23 92.27 7,882.66 7,753.66 346.41 1,058.35 2,544,876.54 264,470.66 2.87 806.65 MWD(3) 8,166.00 48.14 92.52 7,947.82 7,818.82 343.52 1,127.40 2,544,872.24 264,539.63 3.07 870.24 MWD(3) 8,261.00 50.50 91.41 8,009.74 7,880.74 341.06 1,199.39 2,544,868.32 264,611.56 2.64 936.30 MWD(3) 8,356.00 52.75 91.13 8,068.72 7,939.72 339.41 1,273.85 2,544,865.17 264,685.96 2.38 1,004.23 MWD(3) 8,451.00 53.71 92.27 8,125.58 7,996.58 337.15 1,349.91 2,544,861.36 264,761.96 1.39 1,073.88 MWD(3) 8,495.00 54.19 92.54 8,151.48 8,022.48 335.66 1,385.45 2,544,859.14 264,797.47 1.20 1,106.61 MWD_InterpAzi+sag(4) 8,579.00 54.78 96.06 8,200.28 8,071.28 330.52 1,453.61 2,544,852.63 264,865.51 3.48 1,170.36 MWD_InterpAzi+sag(4) 8,641.49 51.53 98.77 8,237.76 8,108.76 324.10 1,503.19 2,544,845.20 264,914.94 6.25 1,217.89 MWD+SC+sag(5) 8,702.58 47.92 104.87 8,277.26 8,148.26 314.62 1,548.78 2,544,834.80 264,960.33 9.64 1,263.12 MWD+SC+sag(5) 8,765.67 45.07 110.87 8,320.71 8,191.71 300.65 1,592.31 2,544,819.94 265,003.56 8.24 1,308.43 MWD+SC+sag(5) 8,826.06 42.12 116.12 8,364.46 8,235.46 284.11 1,630.49 2,544,802.63 265,041.39 7.73 1,350.01 MWD+SC+sag(5) 8,889.06 40.30 119.00 8,411.85 8,282.85 264.93 1,667.28 2,544,782.71 265,077.79 4.17 1,391.48 MWD+SC+sag(5) 8,950.16 39.20 122.99 8,458.84 8,329.84 244.83 1,700.76 2,544,761.94 265,110.86 4.55 1,430.35 MWD+SC+sag(5) 9,013.48 37.37 127.26 8,508.55 8,379.55 222.29 1,732.85 2,544,738.75 265,142.48 5.08 1,469.01 MWD+SC+sag(5) 9,073.40 34.45 130.43 8,557.08 8,428.08 200.29 1,760.23 2,544,716.20 265,169.40 5.78 1,503.19 MWD+SC+sag(5) 9,134.98 32.57 135.79 8,608.43 8,479.43 177.10 1,785.06 2,544,692.51 265,193.75 5.69 1,535.57 MWD+SC+sag(5) 9,197.08 30.36 140.88 8,661.41 8,532.41 152.94 1,806.62 2,544,667.92 265,214.82 5.56 1,565.43 MWD+SC+sag(5) 9,261.88 29.71 146.20 8,717.51 8,588.51 126.89 1,825.89 2,544,641.48 265,233.55 4.23 1,594.02 MWD+SC+sag(5) 9,322.31 32.79 150.33 8,769.18 8,640.18 100.21 1,842.32 2,544,614.48 265,249.44 6.21 1,620.33 MWD+SC+sag(5) 9,383.34 32.83 153.63 8,820.47 8,691.47 71.03 1,857.85 2,544,584.99 265,264.38 2.93 1,646.90 MWD+SC+sag(5) 9,446.23 32.09 156.27 8,873.54 8,744.54 40.46 1,872.15 2,544,554.14 265,278.05 2.54 1,672.94 MWD+SC+sag(5) 9,507.48 30.43 154.64 8,925.90 8,796.90 11.55 1,885.34 2,544,524.96 265,290.65 3.04 1,697.28 MWD+SC+sag(5) 9,569.06 31.74 151.33 8,978.64 8,849.64 -16.76 1,899.79 2,544,496.37 265,304.52 3.50 1,722.50 MWD+SC+sag(5) 9/19/2017 12:52:10PM Page 11 COMPASS 5000.1 Build 81D . Halliburton Definitive Survey Report • Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map ..r Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-WSNorthing ''Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) 1 . (ft) (01100) (ft) Survey Tool Name 9,630.87 31.78 145.27 9,031.21 8,902.21 -44.41 1,916.87 2,544,468.38 265,321.04 5.16 1,749.81 MWD+SC+sag(5) 9,692.26 31.10 138.77 9,083.60 8,954.60 -69.62. 1,936.54 2,544,442.77 265,340.18 5.63 1,778.40 MWD+SC+sag(5) 9,754.53 32.45 136.34 9,136.54 9,007.54 -93.81 1,958.67 2,544,418.14 265,361.82 2.99 1,808.78 MWD+SC+sag(5) 9,816.60 32.33 138.39 9,188.95 9,059.95 -118.26 1,981.19 2,544,393.23 265,383.84 1.78 1,839.63 MWD+SC+sag(5) 9,878.68 33.37 140.57 9,241.11 9,112.11 -143.87 2,003.06 2,544,367.20 265,405.18 2.54 1,870.38 MWD+SC+sag(5) 9,941.04 33.80 144.93 9,293.06 9,164.06 -171.31 2,023.92 2,544,339.33 265,425.48 3.93 1,901.01 MWD+SC+sag(5) 10,002.79 30.85 143.54 9,345.24 9,216.24 -198.11 2,043.20 2,544,312.15 265,444.21 4.93 1,929.94 MWD+SC+sag(5) 10,064.52 29.66 138.04 9,398.57 9,269.57 -222.20 2,062.83 2,544,287.66 265,463.34 4.88 1,958.02 MWD+SC+sag(5) 10,125.62 31.29 134.65 9,451.23 9,322.23 -244.60 2,084.22 2,544,264.84 265,484.28 3.88 1,986.96 MWD+SC+sag(5) 10,187.18 32.87 135.68 9,503.39 9,374.39 -267.79 2,107.27 2,544,241.19 265,506.85 2.72 2,017.74 MWD+SC+sag(5) 10,249.43 33.91 140.96 9,555.38 9,426.38 -293.37 2,130.01 2,544,215.15 265,529.07 4.96 2,049.27 MWD+SC+sag(5) 10,311.48 35.33 145.34 9,606.45 9,477.45 -321.57 2,151.12 2,544,186.52 265,549.60 4.62 2,080.46 MWD+SC+sag(5) 10,375.01 34.54 148.33 9,658.53 9,529.53 -352.01 2,171.03 2,544,155.69 265,568.88 2.97 2,111.51 MWD+SC+sag(5) 10,436.85 33.69 148.47 9,709.73 9,580.73 -381.55 2,189.20 2,544,125.78 265,586.45 1.38 2,140.62 MWD+SC+sag(5) 10,498.73 31.73 145.58 9,761.80 9,632.80 -409.61 2,207.38 2,544,097.37 265,604.05 4.05 2,169.09 MWD+SC+sag(5) 10,563.03 . 32.61 143.53 9,816.23 9,687.23 -437.49 2,227.24 2,544,069.09 265,623.34 2.18 2,199.01 MWD+SC+sag(5) 10,623.67 35.00 143.32 9,866.61 9,737.61 -464.58 2,247.34 2,544,041.59 265,642.89 3.95 2,228.81 MWD+SC+sag(5) 10,682.96 36.60 142.71 9,914.70 9,785.70 -492.28 2,268.21 2,544,013.48 265,663.19 2.76 2,259.55 MWD+SC+sag(5) 10,748.79 38.70 140.32 9,966.82 9,837.82 -523.74 2,293.24 2,543,981.52 265,687.58 3.88 2,295.68 MWD+SC+sag(5) 10,810.68 38.36 143.26 10,015.24 9,886.24 -554.02 2,317.08 2,543,950.76 265,710.80 3.01 2,330.23 MWD+SC+sag(6) 10,872.02 40.18 138.85 10,062.73 9,933.73 -584.18 2,341.50 2,543,920.11 265,734.59 5.43' 2,385.23 MWD+SC+sag(6) 10,928.95 43.32 136.51 10,105.20 9,976.20 -612.19 2,367.03 2,543,891.59 265,759.55 6.16 2,400.33 MWD+SC+sag(6) 10,997.26 45.46 132.79 10,154.02 10,025.02 -645.74 2,401.03 2,543,857.36 265,792.87 4.93 2,445.45 MWD+SC+sag(6) 11,057.58 47.89 131.80 10,195.41 10,066.41 -675.26 2,433.49 2,543,827.19 265,824.72 4.20 2,487.45 MWD+SC+sag(6) 11,120.29 51.70 130.39 10,235.88 10,106.88 -706.72 2,469.59 2,543,795.00 265,860.17 6.31 2,533.56 MWD+SC+sag(6) 11,183.41 54.05 129.85 10,273.98 10,144.98 -739.15 2,508.07 2,543,761.80 265,897.98 3.79 2,582.25 MWD+SC+sag(6) 11,246.80 58.13 129.82 10,309.33 10,180.33 -772.84 2,548.46 2,543,727.30 265,937.68 6.44 2,633.20 MWD+SC+sag(6) 11,309.99 59.71 129.94 10,341.95 10,212.95 -807.54 2,589.99 2,543,691.76 265,978.49 2.51 2,685.61 MWD+SC+sag(6) 11,371.48 59.93 128.54 10,372.87 10,243.87 -841.16 2,631.16 2,543,657.31 266,018.97 2.00 2,737.23 MWD+SC+sag(6) 11,433.17 59.87 129.22 10,403.81 10,274.81 -874.66 2,672.71 2,543,622.98 266,059.82 0.96 2,789.15 MWD+SC+sag(6) 11,494.87 60.64 130.86 10,434.42 10,305.42 -909.12 2,713.72 2,543,587.69 266,100.12 2.62 2,840.99 MWD+SC+sag(6) 11,556.87 59.70 131.47 10,465.26 10,336.26 -944.52 2,754.21 2,543,551.47 266,139.88 1.74 2,892.77 MWD+SC+sag(6) 11,619.21 59.50 133.24 10,496.81 10,367.81 -980.75 2,793.94 2,543,514.45 266,178.87 2.47 2,944.21 MWD+SC+sag(6) 11,681.61 60.01 134.78 • 10,528.24 10,399.24 -1,018.20 2,832.71 2,543,476.22 266,216.87 2.28 2,995.31 MWD+SC+sag(6) 11,743.63 61.13 133.58 10,558.71 10,429.71 -1,055.84 2,871.45 2,543,437.80 266,254.83 2.47 3,046.47 MWD+SC+sag(6) 11,805.71 62.60 132.88 10,587.99 10,458.99 -1,093.33 2,911.33 2,543,399.51 266,293.95 2.57 3,098.60 MWD+SC+sag(6) 11,867.91 63.14 132.99 10,616.35 10,487.35 -1,131.04 2,951.86 2,543,360.99 266,333.70 0.88 3,151.41 MWD+SC+sag(6) 11,929.68 62.59 133.62 10,644.52 10,515.52 -1,168.74 2,991.86 2,543,322.48 266,372.93 1.27 3,203.73 MWD+SC+sag(6) 11,991.00 63.30 132.07 10,672.42 10,543.42 -1,205.88 3,031.90 2,543,284.54 266,412.21 2.53 3,255.84 MWD+SC+sag(6) 12,053.54 63.09 128.97 10,700.62 10,571.62 -1,242.14 3,074.33 2,543,247.43 266,453.88 4.44 3,309.74 MWD+SC+sag(6) 91/19/2017 12:52:10PM Page 12 COMPASS 5000.1 Build 81D 0 Halliburton • Definitive Survey Report Company: Hilcorp Alaska,LLC Local Co-ordinate Reference: Well GP-22-13RD3 Project: Granite Point TVD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Site: Granite Point Platform MD Reference: GP 22-13RD3 Actual RKB @ 129.00usft(Kuupik 5) Well: ' GP-22-13RD3 North Reference: True Wellbore: GP 22-13RD3 PB2 Survey Calculation Method: Minimum Curvature Design: GP 22-13RD3 PB2 Database: Sperry EDM-NORTH US+CANADA Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (°) (') (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 12,114.96 64.48 127.92 10,727.76 10,598.76 -1,276.39 3,117.48 2,543,212.30 266,496.33 2.73 3,363.43 MWD+SC+sag(6) 12,176.72 65.55 128.20 10,753.84 10,624.84 -1,310.91 3,161.56 2,543,176.91 266,539.70 1.78 3,418.06 MWD+SC+sag(6) 12,239.03 65.70 128.22 10,779.56 10,650.56 -1,346.01 3,206.16 2,543,140.90 266,583.57 0.24 3,473.42 MWD+SC+sag(6) 12,337.00 65.70 128.22 10,819.87 10,690.87 -1,401.25 3,276.31 2,543,084.25 266,652.58 0.00 3,560.50 PROJECTED to TD mitchell.laird@halliburton.com Michael Calkins Checked By: 2017.09.2009:3636-08'00' Approved By: °:7i.,;',,h a, "' Date: 9/20/17 9/19/2017 12:52:10PM Page 13 COMPASS 5000.1 Build 81D • • 21 7086 Debra Oudean Rti E Hilcorp Alaska, LLC 3800 CenterpointDrive, rive, Suite 100 Anchorage, AK 99503 Tele: 907 777-8337 Hilrurp,Abisku,i.L(: Fax: 907 777-8510 OCT 1 9 2017 E-mail: doudean@hilcorp.com DATA LOGGED AOGCC 25,20,-7 K. BENDER DATE 10/16/2017 To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician II 333 W 7th Ave Ste 100 DATA TRANSMITTAL GP 22-13RD3 (217-086 2 8 7 1 2 GP 22-13RD3 PB1 2 8 7 1 3 GP 22-13RD3 PB2 2 8 7 1 4 Prints: Formation Log MD / TVD LWD Combo Log MD /TVD Gas Ratio Log MD / TVD Drilling Dynamics Log MD /TVD Final Well Report CD: Final Well Data i Daily Reports 10/17/2017 1:31 PM File folder I DML Data 10/17/2017 1:31 PM File folder Final Well Report 10/17/2017 1:31 PM File folder I GP 22-13 RD3 PB1&PB2 10/17/2017 1:32 PM File folder I LAS Data 10/17/2017 1:34 PM File folder Log PDFs 10/17/2017 1:30 PM File folder Log TIFFS 10/17/2017 1:30 PM File folder Show Reports 10/18/2017 1:35 PM File folder Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: ✓� Date: • • 21 7086 Debra Oudean Hilcorp Alaska, LLC GeoTech II 3800 Centerpoint Drive, Suite 100 RECEIVED Anchorage, Tele: 907 777-8337 Hilrnrp Alasrku.1JA: Fax: 907 777-8510 OCT 19 2017 E-mail: doudean@hilcorp.com DATE 10/16/2017 AOGCC DATA LOGGEDt0S/2o1"� K BENDER To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician II 333 W 7th Ave Ste 100 DATA TRANSMITTAL GP 22-13RD3 (217-086 2 8 6 6 4 GP 22-13RD3 PB1 2 8 6 6 5 GP 22-13RD3 PB2 2 8 6 6 6 Prints: ROP GM ADR CTN ALD MD GM ADR CTN ALD TVD CD: Final Well Data El' GP 22-13RD3-Definitive Sutvey.pdf 9/20/2017 9:35 AM PDF Document 188 KB GP 22-13RD3-Definitive Survey.txt 9/19/2017 10:03 Pr Text Document 27 KB GP 22-13RD3-GIS.txt 9/19/20171004 A... Text Document 39 KB .3 GP 22-13RD3 LWD TC Final.las 9/18/2017 934 AM LAS File 2,748 KB GP 22-13RD3 TC MD.cgm 9/18/20171056 A... CGM File 1957 KB 'j]GP 22-13RD3 TC MD.emf 9/18/2017 8:18 AM EMF File 7,436 KB U GP 22-13RD3 TC MD.pdf 9/18/2017 8:25 AM PDF Document 1,300 KB 5..GP 22-13RD3 TC MD.tif 9/18/20171059 A_ TIFF image 22,075 KB GP 22-13RD3 TC TVDcgm 9/18/201710.56 A— CGM File 1,767 KB II GP 22-13RD3 TC TVD.emf 9/18/2017 9:35 AM EMF File 5,696 KB U GP 22-13RD3 IC TVO.pdf 9/18/2017 9:36 AM PDF Document 720 KB a GP 22-13RD3 TC TVD.tif 9/18/201710:59 A... TIFF image 14,737 KB Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: ����.+ Date: • OF Tit 0+1.* ly/ 4 THE STATE Alaska Oil and Gas ofALAsKA Conservation Commission ti � i 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ` Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Stan W. Golis Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt St 22-13RD3 Permit to Drill Number: 217-086 Sundry Number: 317-439 Dear Mr. Golis: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, g)-CEC _ Hollis S. French t Chair DATED this 26 day of September, 2017. RBDMS l/ m OC I 3 2017 • • RECEIVED STATE OF ALASKA SEP 1 8 2017 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOG C 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate 2. Other Stimulate ❑ Pull Tubing ❑ Change Approved Program Q Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: G/L Completion ❑� 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC . Exploratory ❑ Development Q . 217-086 ` 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ElService ❑ 6.API Number: Anchorage,AK 99503 50-733-20095-03-00 , 11 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 76.34 . Will planned perforations require a spacing exception? Yes ❑ No Q j Granite Pt St 22-13RD3 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL018761 Granite Point Field/Middle Kenai Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 12,956 10,746 ±11,670(proposed) ±10,312(proposed) 988 psi N/A N/A Casing Length Size MD TVD Burst Collapse Structural 294' 26" 294' 294' Conductor 600' 18" 600' 598' Surface 3,989' 13-3/8" 3,989' 3,973' 3,090' 1,540' Intermediate 6,643' 9-5/8" 6,643' 6,616' 5,750' 3,090' Production 2,135' 7" 8,495' 8,151' 6,160' 7,020' Liner ±5,630'(proposed) 5" ±11,800'(proposed) ±10,376'(proposed) Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): N/A N/A N/A N/A N/A Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): N/A N/A 12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑✓ Exploratory ❑ Stratigraphic❑ Development Q i Service ❑ 14.Estimated Date for 15.Well Status after proposed work: 9/17/2017 Commencing Operations: OIL ❑✓ . WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W.Golis ____ Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlowe hilcorp.com Authorized Signature: n.1, Date: cl ( I 5 (IContact Phone: (907)283-1329 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test 0 Mechanical Integrity Test ❑ Location Clearance CI' ` 3 Other: 5-00 ,n '):. at)t / �''t— RDDMS i, -UL i - 3 2017 Post Initial Injection MIT Req'd? Yes ❑ No ❑ U j� e 27,14--) Spacing Exception Required? Yes ❑ No V. Subsequent Form Required: /c) — 17 O 7 (6,,,...,:....j �`APPROVED BY `� Approved by: Agej COMMISSIONER THE COMMISSION Date: I•`1 ri"J7 ,/22//?-6. -tic S-3, c.Or Ca= cOn .7..2 ~2 m Submit Form and Form 10-403 Revised 4/2017 p h o alid for 12 months from the date of approval. I Attachments in Duplicate • • Well Work Prognosis 111 Well:GP 22-13rd3 Date: 09/15/2017 Hilcorp Alaska,LLC Well Name: GRANITE PT ST#22- API Number: 50-733-20095-03 13RD3 (GP 22-13rd3) Current Status: New Sidetrack(was an Leg: Leg#3 injector) Estimated Start Date: September 17, 2017 Rig: Kuukpik 5 Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett(8332) Permit to Drill Number: 217-086 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907) 398-9904 (M) Second Call Engineer: Monty Myers (907) 777-8431 (0) (907) 538-1168 (M) Current Bottom Hole Pressure: 2,000 psi @ 10,119'TVD 0.198 lbs/ft(3.80 ppg)based on offset producers Maximum Expected BHP: 2,000 psi @ 10,119'TVD 0.198 lbs/ft(3.80 ppg)based on offset producers Maximum Potential Surface Pressure:988 psi Using 0.1 psi/ft gradient 20 MC 25.280(b)(4) CHANGE OF APPROVED NDRY 317-407 -^- 317- 'Yd 7 Brief Well Summary GP 22-13rd3 is a 4 C-6 only producer that will be completed with Gas Lift. This new well was side tracked from the current GP 22-13rd2 a shut-in injector.This workover will run completion and perforate the new well. Last Casing Test: Casing and liner tested to 2,000 psi under PTD 217-086 Procedure: 1. ***Take over operations from the Drilling Sidetrack Program *** 2. Test BOP's every 14 days continued from last test date from PTD 217-086.Test to 250psi low/3,500psi high/2,500 psi annular. (Note: Notify AOGCC 48 hours in advance of test to allow them to witness test). 3. Completion fluid will be diesel. BOP's will be closed as needed to circulate the well. 4. Rig up E-Line and run gamma/ccl/cbl. POOH. 5. PU and RIH with TCP guns and Gas Lift completion with plug set in X-Nipple 6. Correlate and space out completion, and set production packer 7. RU E-Line, correlate and space out completion. 8. Set Packer/Pressure test completion: • Pressure up and set packer • Test tubing against plug in X nipple to 2500#and chart for 30 minutes. • Test IA to 2,000 psi and chart for 30 minutes(This will pressure up tubing also). • Pull prong and plug in X-Nipple. 9. Set BPV. NU tree,test same. 10. Turn on Gas Lift and unload wellbore to achieve desired underbalance. 11. Fire TCP's as per program, retrieve drop bar. 12. Turn over to production. 13. Schedule SVS testing with AOGCC as per regulations. Attachments: 1. Well Schematic Current • • Well Work Prognosis Well:GP 22-13rd3 Date: 09/15/2017 Hilcorp Alaska,LLC 2. Well Schematic Proposed 3. Wellhead Schematic Proposed 4. BOP Drawing 5. Fluid Flow Diagrams 6. RWO Sundry Revision Change Form • .ti Granell:iteGranite Point PlatformPtSt W Last Completed: Future PROPOSED PTD:XXX-XXX API: 50-733-20095-XX 22-13RD2 1111eur,i 4.1.1-1-1.1.1.( CASING DETAIL Size Wt Grade Conn ID Top Btm �J 26" Inside Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515" Surf 3,989' 9-5/8" 40&43.5 N-80 BTC&8rnd Surf 6,643' 184 i 7" 29 L-80 BTC 6.184" 6,360' ±8,500'(KOP) 5" 23.2# L-80 SLIJ-II 4.044 ±4,900' 13,169' 13-3/8" 1 0 El No Depth (MD) Depth (TVD) ID Item 9-5/8" 1 ±4,900' ±4,884' ZXP liner hanger/packer 2 ±8,500' ±8,154' KOP 3 ±4,900'—13,169' ±10,913' 5"23.2#L-80 SLIJ-II k C2 Said 1 54 CEMENT DETAIL No TOC Depth TOC Depth Volume Item (MD) (ND) ±8,300' ±8,037' 78 bbls 15.3 ppg Class G cement w/%2 bbl 8. cemnet LCM ' c6 Said 4. t. C7 Sand fl PBTD:13,069' TD:13,169' MAX HOLE ANGLE=700 Updated By:MMM 05/26/17 • • Granite Point Platform Well: Granite Pt St 22-13RD3 • II Last Completed: Future PROPOSED PTD:217-086 API: 50-733-20095-03 Hileorp Alaska,LLC KB=42.3'or 115'RKB from MSL CASING DETAIL Size Wt Grade Conn ID Top Btm 26J 26" Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515" Surf 3,989' 40 N-80 BTC 8.835" Surf 6,409' 9-5/8" 18" 43.5 N-80 BTC 8.755" 6,409' 6,643'TOW 7" 29 L-80 BTC 6.184" 6,360' 8,495'(TOW) 1 2 5" 23.2 L-80 Hydril 513 4.044" ±6,170' ±11,800' 13-3/8" A s TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441" Surf ±6,125' =HI TOC@ MI 3 2-3/8" 4.7 L-80 8rnd EUE 1.995" ±6,125' ±10,534' 5,864' �I 9-5/8"" JEWELRY DETAIL No Depth Depth ID OD Item (MD) (TVD) Tubing Hanger I 1 ±350' ±350' 2.313" SSSV ±2,508' ±2,500' 2.441" GLM#1 2 ±4,314' ±4,300' 2.441" GLM#2 ±5,718' ±5,700' 1.995" GLM#3 3 ±6,125' ±6,102' 1.995" Crossover AINFil , ' , ' . " #4 ±7±6,470' ±7±6,400700 11.995995" GLMGLM 4 roc@ tr ±9,246728' ±8,000'' 111.1999999555';': .995" GLM#65 8,362' 4 ±9,003' ±8,500' 1.995" GLM#7 ±9,594' ±9,000' 1.995" GLM#8 7" i l ±10,264' ±9,570' 1.995" GLM#9 5 ±10,294' ±9,595' Halliburton ROC Gauge Mandrel w/0.25" I TEC wire ±10,296' ±9,597' 1.995" RA Marker 4 6 ±10,336' ±9,630' 1.940" Packer ASR 7 ±10,347' ±9,639' 1.875" X Nipple ±10,534' ±9,785' 1.995" Ported Sub ±10,545' ±9,793' N/A Mechanical Firing Head 8 ±10,555' ±9,800' N/A TCP Assembly ±11,561' ±10,261' N/A Lower Firing Adapter Awl ±11,566' ±10,263' N/A Absolute Pressure/Time delay Firing Head TOC @ x,xxx' 0 r* IIII:. 5 ''� 6 PERFORATION DETAIL i a 8 Zone Top Btm Top (MD) (MD) (TVD) Btm (TVD) FT Date Status Comment o C-6 ±10,555' ±11,560' ±9,800' ±10,261' ±1,005' Future 3-1/8"6 spf C-6 PBTD:±11,670' TD:12,956' MAX HOLE ANGLE=67.84°@ 11,002' Updated By:DEM 09/15/17 • •• • iiiGranite Point GPP 22-13RD3-Proposed 08/22/2017 Hilcarp Ilad.a.1.T( Granite Point Tubing hanger,FMC-UH- GPP 22-13RD3 TC-1A-EN-CCL,13 5/8 5M X 18 X133/8 X95/8X 3'/,IBTlift and3''AIBT 3 1/2 susp,w/3"type H BPV, 6.990"EN,2-'A npt control line feed-thru BHTA,Bowen,3 1/8 5M FE X 3"Bowen Al Valve,Swab,WKM-M, sr 3 1/8 5M FE,HWO,EE trim - I Valve,SSV,Wing,WKM-M, i 3 1/8 5M,w/15"OMNI oper \ __._../'— Tee,stdd,3 1/8 5M X 3 1/8 5M [ . c Valve,Master,WKM-M, „,, 3 1/8 5M FE,HWO,EE trim -” *Kik.? Imam Valve,Master,WKM-M, iv.- cal 31/85M FE,HWO,EE trim OO V V Control line x2 ,ii, t-- Adapter,FMC-ASP,13 5/8 5M --"---__--'- API clamp X3 1/8 5M,w/ \. 6.990"extended neck pocket Unihead,OCT type 2,13 5/8 5M API _ hub top X13 3/8 BTC casing bottom r • OO': w/2-2"LPO on lower section,2-2 - 1/16 5M SSO on upper section IP 'O �- internal lockpin assy -.i ' °'' Valve,WKM-M,21/165M �j_p 5,,;.'.; 'fl1E HWO,AA trim . r .;- ;Coy,}��r:E ■;,, J c(�� I � r �_ Starting head OCT, mik,.. 4 dt...4_,, 211/42M Hubx24'/.1MValve,OCT-20,2"LPO,HWO, Hub w/2-2"LPO,prepped f/ alli I Adiew AA trim IIXIMINlIiM rirl", 18"EN hanger �.�� --� Conductor housing �- _-_ `� 24%1M HubX .LTJ . • O 24"Buttweld ' 8" r 13 3/8" 9 5/8" 3'A" • •ranite Point Platform 2017 BOP Stack(Kuukpik) 04/24/2017 Hilraup Alaska..1.LC Rig Floor 111 111 16" Pipe Itl!III!Ill!RI!I11 111 ill Ill Ill Iii I1411 3.74 Shaffer 13 5/8 5M Maffratisnin Shaffer SL r_i �� 2 7/8-5.5 Variables 2.83 —'� 13 5/8 5M E = -4I , Blind _a UMW 2 1/16 5M manual and"'R valve 2 1/16 5M manual and HCR valve 111 7l 1.76 f1t 'Jr iit.liidi6pl=�I� •1 Tti ' : Shaffer SL 1.44' `'_� 13 5 e®M 2 7/8-5.5 Variables A Drill deck 13.70' Riser 135/8 SM FE X 13 5/8 5M API hub • • Choke Manifold Valves 2 3" To Shaker 3" Panic To Gasbuster 3 1/8"_ 2 1/16" ~� O 2 1/16" ( RI ili iT i8 S 2 1/1 + 2 1/16" + N I - rn3 1/8` + + I c' L _ _v, ( + ,....1�`` / 21/16" 21/16" Manual Choke \ Automatic Choke 2 1/16" Inlet Pressure Sensor 3" 5,000 PSI Choke Manifold Kuukpik Drilling Rig 5 RED = 3 1/18" 5,000 PSI VALVES AND LINES BLUE = 2 1/16" 5,000 PSI VALVES Kuukpik Drilling Rig 5 Choke Manifold . a . x C-2 * A. 01 #10 (.... U.#6 • p9 .....rt #16 n5 ' #1 #2 OIL i 11111. c-1 #15 *-,: .. Kuukpik Drilling Rig 5 Choke Manifold • • E CZ) b,0 CC: . . . . . . . ---, a I•ol (21 2 ,t. ... 2. 0,.a ... .. ., i-,', ... "8! Z)'!.7.., r)! `fl' k . 0,„,o,r.,-.1 o I I 4. ..,..-1 1 wi .1 ...-I 1;•-.0•,..ml .1 I .• • • • -... P. •)--, 0 Cl) ell I 4.1 I'l 70. & -o "0 0 CL D (J) :-3I 1.9.1;11 .'"IeI (- E :•-• 0) D 2 Cl- P o•g•t-J.:4. P c..,•,... . a) ._ 0- 4 •crui...1_1,4 1:21 .,5-101 a CL .• C.>.z.— ......• .1. c•aa. ;.- -III c, 0-_ =I , 1 "I 14,1 ro - -0 -1 lei• i co , 7,1 1 01 :.:1 I 1I Vt CO t, III It II CV CV • CV • csi a •-•.:..1:rt.ri,0 ri.rt.et, C1111.° 11I 'V. V ;A •v."' o 4.,, A oi . F. C. A .- 1-C) A 1,.. .0 CV = IIIIIIIIIIMILALTE1 bil t/5 11.4 "rill illiirirrrilr 111111111 V 0) g .0.-o-o..0-0-0-0,1z,973. 4,1 4,1 WI 4,1 4,1 0,1 °I 0,1 v I AT.. 7,4 .2121212121212121-el a) -- 1 U.(.).L).(Jt.).(r).(..).(-) 0) .-, 11111111 I c c/D :1" I t-I..-IvI vI.....I t-I vl • I I V 0 •••• ..- ft op ',... ., A csi i Oit)lei 01010101.mi 0,1 .,--, Ct :,..1;gi,7,1 v 01212101v! t.,1 r. co 1.z.!0! i: i: 1,....!...ci). 1 gl '21 0 0) CO cz3 i es!ell"11")1 e4I 4-41'.11 ell I OA 1.4 I- 4 14 111111111 4. h- • 0 — V CO 4'i°I..'ell..0)11.1.cl,olt-I WI 0 e— • 0 A — =1111111111 Z •— :e. ,,z, . , , , , , , . • 'Vr C6 0• .- •CNI "C) c s_ ,..• •,— A ow ow CD Q) &, e. •t: od til 0 .Y _0 N.•V — CO (•N V .4., .0 Cr) N. A •, ....... • "w U C.0 LC) (73 a 1111111=1=1 jos.• V LO 4'3 ti ti gi 2! 2! gi gi .1 wi • • — !-. r8" 0 81 8 el 81 Si 84 6 1 A. iiiiiiiII _1 ao' W W' W. 4., 44. co 0' ao. ..-.17.1..g1 Iil ;1 7.1;7,1% ....1 c5;u;43;oi o;oi oi oi oi 4 ....I csi 2,1„91gisi sq gig' .c!:-.:)!Fc,!:-.D! z!Zp! :.!t:.!.:0! -7'1.7.-!it•-•'!"--!..t..."...r..41^,:.'ir...!,'-'1 in 1,C eil.41.41 rileilrtIrtIrtlril b.!) C_, v- iiIIIIiii 00 ..--, P4 C (11 0.J. 0111111111 O C -6. .—. !... c .,--. ... e. .e. 4.4 ...% ,-- 0 ,.0 U ,-- • • C0 00 °Iai1aiQio =Iaiai 1 w, 4„. W. d,y^ Cl. yi. N, N n•IOIalalN al OI MI 00,0.0.0. 00 0.0.0, 0 cul I I I I wAI I �i qi I I L ai iii%i .I 9,1Ti 00 a -o -51 i a1�i �1�I D +-, jI Inial ai aI �-I LL < C 0 o 1 pG 1;i I I d o I n1 P4 I C G n,. a CII a �I�I 31 I =I aim �1=i'"i a - yl 1411jI _I of i w it I yI I --0,1m°! i :co I I�N„) UI I I c I MI °101 I I I ►� J 1 I I I ' I I Cr CI I, NF d i i i id i i i N N Y .O a•o•..•rl•o .•,•a•v,• AN O ..1nir11r11 8 HIr1,r11 I I I I'. I I I N • w C w O. Uw a 1.41 : 11111111t^t c/D /�{� , , , , , , , O c A r N! N! N! N! N! NI N! N! N! 01ol_1_I S12.1-9.1°12121 czt 3 a° vi vi vi,,,LiiuiLi .iQi 1i ♦O 12,, a1 wi:I::1 di 4.1 I w, w•..,z• w, w, 1lC-1 A N i WK.)!uII C910!0..wI yO Y al' 16al +Iof " a . b.') 00 .Iolololoiololo, oIU1 . I�Itn••�Io,oiolvlo,UI41 c Ire1�1: I_ 1koI: I =1 =1 N i".i^"1GOi�i^'i^"i00i .1�1 C) O.41 ►/ ►� --- Ire i r11 c.,IM Ir1!r'In lei 1 ,. ai 1 1 1 1 1 1 1 1 I U r' •_ - 4101, 1r4l..ylylvielt-lppl O alltlltllll Ste. ill ►41i i i i i i 1 C v Cl.) L _A c- o F w .: N i f/) - 4: a x N—• CO • .0 co (s) UL A U ca ( ►41 C 1 I 1 1 1 1 1'flI,OI n: , • Lo C yl al 0 Ci vl WI a1 �1 N1 C.' C,• C.' C.• C.' C.' C.• O' O 0 0!0!010101010101,7)0. 1 1 1 1 1 1 1 1 1 M, A, M. w, w, w, w, w, A, 010101(.)IC.,101(..)1"...)1(. 1 a yi y1 0.1 0.1 yi 0..1 GI 0.1 Q,, I• C'IC'IC'IC'IC'ICIC'1C'1C1 w o,o,o,o,oo,o,o,o , :- V.1 v,i v,1 V.1 vel v11 v.l V.1 vel k0,,'0,`2,,0,W,,'01`0,;01;o 1 inI'-'""ICI's,-I---!I"--.2,CI'"1 r1 I rt 1 rill r 1 i ell rd r4,r1 I ell bh U m 1 I l I i 1 I I I c V 1 1 1 1 I 1 I 1 1 .r. .-•. .,-. o S. w y 1212: i x ..--oO U • • E II I I aI I I C al I 0d,o al didl • 0 . a'" , 101_l01010100UU1 1 IIa I 1 1 yl 1 1 yl I 1 o - ql 1 dl;l 1 1 . ''.I 1141;.1 01 ,,:l4-1 L t 01 10101 0.1wI I �Q : ii 1 y •aaioo d al 141 1 ,_I,,l -p , e.1 lel y1 a! of mof 17:31',71UI!"I (1) of MOI I I I 4 dd a) '"I 1 I I I I CO 1 J I I 1 I d II N N N Y .rl r.�r,�r,�a r,�rl`el' 11 1 1 1 I 1 1 1 IF uNi y N .v o CV 111111111111111111 0,1 mT■ ■ ?Y 91,II191a1 1•.19191 I °'I y1 yl yi 0.1 21 yl NI dl C A•, e' c' c' c' a. c' o'o'a, O 1-1^•1-101-1-1-101 '-- a) a' UIUIUIUIUIUUI; I II V] p J Ia,laiyl0,la,lylof I A ,ldA'A Y l01U,N I�I3IUIUI3I 7,1 yl CCl 0 Y 410101 al alo1of alg1a1 (B 10101010,10101001=1UI - I. I. I I I. 1.'1 1;,1 0.1 o '1..1.°I.Ia?la?1,,0.1.ZO.la?I oII ►A 11.41111.•410.4 I l 1 1 11 1 t 1 1 q 1 1 1 1 1 1 1 III N N— ♦ ♦ CO 61 21..1,":1,,,,1,,,,1,,,,�1,"I,..,1'°1 vI 1 I 1 1 1 1 III • ►4111 0 v •C p♦ •— •♦N (a ch ,c L ♦ A w n i U) 4) 'q1 D Y c U) r co0 10 0 ►-41 N♦ co; v i e 1 1 1 1 1 1 1.p 1.p 1 O G O O O O G O y y a. c. y . . . o.o c., . 0.,ca. o. Mo▪ 01010101010101 U1 VI 11111111 1 yq•al yl yl y1 yl y1 4'1 0.'1 0.'1 a•A•A•A•A•A•Al q. 010101010101010101 • oloiolololololoiol .s o•o.o•o•o•o•o•o•o• 0l0101010101o1o1oi v,,v,,v,.v,.v,.v,,v,,v,,v,, kr) __.. _ Y. _ _ - to I: Ic Ic Ic 1. 1_ I: 1 T ',o•,o •o •o •oro ..o •o ,o r,lrklrilrul ril ril rIIr11 rI! U 1 4 ! I I I I 1 1 1 P •C t 1 1 1 1 1 1 1 1 1 bO (4 a "'Ir4l~'IKIv'I'olr-1°DIo'1 % I 1 1 1 1 1 1 1 1 s•, 8 0 q n v I I _C U • • 11 Kuukpik 5 BOP Test Procedure Hilcorp Alaska,LLC Attachment#1 Attachment #1 Hilcorp Alaska LLC. Rolling BOP Test Procedure: Kuukpik 5 — Oil/Gas Producers, Water/Gas Injectors Initial Test(i.e.Tubing Hanger is in the Wellhead) If BPV profile&lift threads were deemed good, but still unable to get good tests 1) If both set of threads appear to be bad and unable to hold a pressure test and/or a penetrator leaks, notify Operations Engineer(Hilcorp), Guy Schwartz (AOGCC-guy.schwartz@alaska.gov),Jim Regg (AOGCC-jim.regg@alaska.gov) and Michael Quick (AOGCC—Michael.quick@alaska.gov)via email explaining the wellhead situation prior to performing the rolling test. If on Federal land contact BLM representative Amanda Eagle (aeagle@blm.com) and Mutasim Elganzoory(melganzoory@blm.com). AOGCC and BLM may elect to send an inspector to witness.As outlined and approved in the sundry, proceed as follows: 2) With stack out of the test path,test choke manifold per standard procedure 3) Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down-hole and not leaking anywhere at surface.) Kill and choke line valve will also be tested during this time. 4) During these tests the test chart needs to be set to 60 min instead of 12 hours so chart shows a better graph. Need to station hands in cellar going over all connections on the BOPS looking for the slightest leak. Also need a man looking down the hole to confirm that the BOPs are not leaking. Test# 1=Annular, HCR Choke, and HCR Kill. Test#2=Upper Pipe Rams, HCR Choke, and HCR Kill. Test#3=Upper Pipe Rams, Manual Choke, and Manual Kill. Test#4=Lower Pipe Rams. 5) Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. 6) Once the BOP ram and annular tests are completed,test the remainder of the system following the normal test procedure (floor valves,gas detection, etc.) 7) Record and report this test with notes in the remarks column that the tubing hanger/BPV profile/penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 8) Pull hanger to surface. (Making tubing cuts as necessary to free tubing). CBU to displace annulus and tubing with kill weight fluid and sweep off any oil cap that may be present. 9) If a rolling test was conducted, remove the old hanger, MU new hanger or test plug to the completion tubing. Re-land hanger(or test plug) in tubing head. Test BOPE as per Kuukpik's standard test procedure. Or POOH laying down all the tubing and use the normal test plug to finish the tests that were not completed as per regulatory approval. • Kuukpik 5 BOP Test Procedure Fri orp Alaska,HA; Attachment#1 If the tubing hanger won't pressure test due to either a penetrator leak or the BPV profile is eroded and/or corroded and BPV cannot be set with tree on. Profile and/or landing threads must be prepped while tree is off. Worst Case: BPV profile and landing threads are bad. 1) Attempt to set BPV through tree and test. May have to tap out if scaled up or paraffined up if well is not dead may have to be done w/ pressure lubricator (diesel or acid could help) 2) If unsuccessful, or BPV profile is eroded and well is dead. Best practice is to have two barriers a. Fluid column b. Set wire line plug or tag fluid level with slick line to establish static fluid level or shoot fluid level with an echo meter gun. 3) Shoot off tubing very shallow ( 300-500' most likely just under SSSV if applicable) 4) Spear hanger w/ upside down cup provided by fishing company 5) Proceed to get best test we can achieve against cup and confirm no visual leaks on all flanges of BOPE 6) Notify Hilcorp Anchorage Operations Engineer and AOGCC of situation 7) Pull hanger and cut off stub 8) P/U test plug and set same. 9) Perform complete BOPE test as per Kuukpik's standard procedure • • � � 0 / > cc O a O 7,3 e c 2E 0oS U 2k ° E0 < a E ® § t ) S. f § i o m f / = 0 / ID X � �03 > _ _ C� / Co'co e m / CO . . % .(L) n -0 ■ ■ 0 00 $ E22 ea a. $ c0 2 � c c M ca co 2J CI / m CD 09- l. c414 1 ~ - > 03) �_ _ � O / a U. a ° @ % 0 /- C o » co — 7U q \ C) Cl) @ < ) L. i_ E § ° 0 e - 0 2 0 : a § - E a . C) - - /ea § .� k 2 / 5) Cl) ■ c c W k 2 / 0 2 a) o 0 a § / 0. A > ci 0 . 4 $ x § t E 0 \ ) C ■ q Q § x a R % ct / / a Tv' C.) .0 o ■ U) 0 � � 0 > co CJ p .. _ % / U 00 > t3 o g k /0 / / U) @ # Cl)< < I or T,� Alaska Oil and Gas ��.\����y/, � THE STATE E, ,; of Conservation Commission _ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 T1 Main: 907.279.1433 ® • ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Stan W. Golis Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Dr., Ste. 1400 Anchorage, AK 99503 Re: Granite Point Field, Middle Kenai Oil Pool, GPS 22-13RD3 Permit to Drill Number: 217-086 Sundry Number: 317-407 Dear Mr. Golis: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ae.„, 1° 144/14--N Cathy P. Foerster Commissioner DATED this j day of August, 2017. RDDNIS UV AUG 3 1 2017 • • RECEIVED STATE OF ALASKA AUG 2 412017 ALASKA OIL AND GAS CONSERVATION COMMISSION • APPLICATION FOR SUNDRY APPROVALS Jed) 7 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Repa'r Well ❑ Operations shutdown Suspend El Perforate El- Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill Cl Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing 0 Other: G/L Completion CI 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. Hilcorp Alaska,LLC Exploratory ❑ Development Q • 217-086 ' 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number. Anchorage,AK 99503 50-733-20095-03-00 7. If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? CO 76.34 I Will planned perforations require a spacing exception? Yes ❑ No CI ✓ Granite Pt St 22-13RD3. 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL018761 Granite Point Field/Middle Kenai Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): ±13,169(proposed) ±10,911 (proposed) ±13,069(proposed) ±10,877(proposed) 988 psi N/A N/A Casing Length Size MD TVD Burst Collapse Structural 294' 26" 294' 294' Conductor 600' 18" 600' 598' Surface 3,989' 13-3/8" 3,989' 3,973' 3,090' 1,540' Intermediate 6,643' 9-5/8" 6,643' 6,616' 5,750' 3,090' Production 2,135' 7" 8,495' 8,151' 6,160' 7,020' Liner ±6,919'(proposed) 5" ±13,169'(proposed) ±10,911'(proposed) Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): N/A N/A N/A N/A N/A Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): N/A N/A 12.Attachments: Proposal Summary El Wellbore schematic 0 13.Well Class after proposed work: • Detailed Operations Program El BOP Sketch Q Exploratory El Stratigraphic❑ Development 2` Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 9/15/2017 OIL El• WINJ El WDSPL El Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W.Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlowe@hilcorp.com Contact Phone: (907)283-1329 Authorized Signature: ..,,. Date: '&(2, 1 tl COMMISSION USE ONLY Conditions of approval: Notify Commission so t at a representative may witness Sundry Number. Plug Integrity El BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ Other: ���CCC Post Initial Injection MIT Req'd? Yes ❑ No a Spacing Exception Required? Yes ❑ No I" Subsequent Form Required: "VO L4o4 , / � I 2,;7 RIb1�o�Y�� �V AL J LU ii APPROVED BY Approved by:a183/ 0 / / ')L_ COMMISSIONER THE COMMISSION Date: g_ 31_ / 7 ?ice 7- ,e 9-50n7 fll,tin R IIINIAL • Submit Form and Form 10-403 Revised 4/2017 Approved application is valid 1 O t r Attachmentss in Duplicate • . Well Work Prognosis Well:GP 22-13rd3 ffilrp Alaska,LLC c Date: 08/23/2017 Well Name: GRANITE PT ST#22- API Number: 50-733-20095-03 13RD3 (GP 22-13rd3) Current Status: New Sidetrack (was an Leg: Leg#3 injector) Estimated Start Date: September 15, 2017 Rig: Kuukpik 5 Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett (8332) Permit to Drill Number: 217-086 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907) 398-9904(M) Second Call Engineer: Monty Myers (907) 777-8431 (0) (907) 538-1168 (M) Current Bottom Hole Pressure: 2,000 psi @ 10,119'TVD 0.198 lbs/ft(3.80 ppg)based on offset producers Maximum Expected BHP: 2,000 psi @ 10,119'TVD 0.198 lbs/ft(3.80 ppg)based on offset producers Maximum Potential Surface Pressure:988 psi Using 0.1 psi/ft gradient 20 AAC 25.280(b)(4) Brief Well Summary GP 22-13rd3 is a C-7 only producer that will be completed with Gas Lift. This new well was side tracked from the current GP 22-13rd2 a shut-in injector.This workover will run completion and perforate the new well. Last Casing Test: Casing and liner tested to 2,000 psi under PTD 217-086 Procedure: 1. ***Take over operations from the Drilling Sidetrack Program *** 2. Test BOP's every 14 days continued from last test date from PTD 217-086.Test to 250psi low/3,500psi high/2,500 psi annular. (Note: Notify AOGCC 48 hours in advance of test to allow them to witness test). 3. Completion fluid will be diesel. BOP's will be closed as needed to circulate the well. 4. Rig up E-Line and run gamma/ccl/cbl. POOH. 5. PU and RIH with TCP guns and Gas Lift completion with plug set in X-Nipple 6. Correlate and space out completion, and set production packer .41_t9€it'ID ren 7. RU E-Line, correlate and space out completion. 8. Set Packer/ Pressure test completion: • Pressure up and set packer • Test tubing against plug in X nipple to 2500#and chart for 30 minutes. • Test IA to 2,000 psi and chart for 30 minutes (This will pressure up tubing also). • Pull prong and plug in X-Nipple. 9. Set BPV. NU tree,test same. 10. Turn on Gas Lift and unload wellbore to achieve desired underbalance. 11. Fire TCP's as per program, retrieve drop bar. 1S C-�1 12. Turn over to production. 13. Schedule SVS testing with AOGCC as per regulations. Attachments: 1. Well Schematic Current 2. Well Schematic Proposed 3. Wellhead Schematic Proposed • • Well Work Prognosis Well:GP 22-13rd3 Hilcarp Alaaka,LLC Date: 08/23/2017 4. BOP Drawing 5. Fluid Flow Diagrams 6. RWO Sundry Revision Change Form . Granite Point Platform Well: Granite Pt St 22-13RD2 • II Last Completed: Future PROPOSED PTD:XXX-XXX API: 50-733-20095-XX Hilcorp Alaska,LLC CASING DETAIL Size Wt Grade Conn ID Top 26, l 26" Inside Conductor Surf Btm 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515" Surf 3,989' 9-5/8" 40&43.5 N-80 BTC&8rnd Surf 6,643' 18'4 7" 29 L-80 BTC 6.184" 6,360' ±8,500'(KOP) 5" 23.2# L-80 SLID-II 4.044 ±4,900' 13,169' 13-3/8" 1 No Depth (MD) Depth (TVD) ID Item 9-5/8" ` 1 ±4,900' ±4,884' ZXP liner hanger/packer I 2 ±8,500' ±8,154' KOP 3 ±4,900'—13,169' ±10,913' 5"23.2#L-80 SLIJ-II 7" 'i; • C2 Sand 'v 1 w,, is r./ CEMENT DETAIL ., at No TOC Depth TOC Depth Volume Item M l (MD) (TVD) C5 Sand ±8,300' ±8,037' 78 bbls 15.3 ppg Class G cement w/1/2 bbl cemnet LCM ;i Ye C6 Said , is t w C7 Sand PBTD:13,069' TD:13,169' MAX HOLE ANGLE=70° Updated By:MMM 05/26/17 Gnit Platform Well:rate GranitePoinPt St 2r2-13RD3 II • Last Completed: Future PROPOSED PTD: 217-086 API: 50-733-20095-03 Hilcorp Alaska,LLC KB=42.3'or 115'RKB from MSL CASING DETAIL Size Wt Grade Conn ID Top Btm 26j26" Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 J-55 BTC 12.515" Surf 3,989' 40 N-80 BTC 8.835" Surf 6,409' 9-5/8° s'A s 43.5 N-80 BTC 8.755" 6,409' 6,643'TOW 7" 29 L-80 BTC 6.184" 6,360' 8,495'(TOW) 2 5" 23.2 L-80 SLIJ-II 4.044" ±6,250' ±13,169' 13-3/8" TUBING DETAIL 2-7/8" 6.5 L-80 8rnd EUE 2.441" Surf ±6,200' TOC @0 ,IMI 3 2-3/8" 4.7 L-80 8rnd EUE 1.995" ±6,200' ±10,975' 5,864' b 9-5/8" 6 I , s JEWELRY DETAIL No Depth Depth ID OD Item (MD) (TVD) Tubing Hanger 1 ±350' ±350' 2.313" SSSV ±2,508' ±2,500' 2.441" GLM#1 2 ±4,314' ±4,300' 2.441" GLM#2 ±5,718' ±5,700' 1.995" GLM#3 ±6,200' ±' 1.995" Crossover ±6,752' ±6,700' 1.995" GLM#4 ±7,467' ±7,400' 1.995" GLM#5 TOC @ ;.%, ±8,242' ±8,000' 1.995" GLM#6 8,362' 4 4 ±9,000' ±8,500' 1.995" GLM#7 L ±9,601' ±9,000' 1.995" GLM#8 Tt ±10,199' ±9,500' 1.995" GLM#9 ±10,810' ±10,002' 1.995" GLM#10 5 ±10,850' ±10,031' Halliburton ROC Gauge Mandrel w/0.25" TEC wire 4 6 ±10,890' ±10,058' Packer 7 ±10,920' ±10,078' 1.875" X Nipple 8 ±10,975' ±10,119' TCP Assembly PERFORATION DETAIL Zone Top Btm Top Btm FT Date Status Comment (MD) (MD) (TVD) (TVD) 1,285' ±10,270' ±1,500' Future I 5 fl 7 a ••• 8 = C7 Sand 1 5" PBTD:±13,069' TD:±13,169' MAX HOLE ANGLE_±67° Updated By:DEM 08/23/17 • 0 • • ti Granite Point GPP 22-13RD3-Proposed 08/22/2017 Hikewp AIa■ka,LEE Granite Point Tubing hanger,FMC-UH- GPP 22-13RD3 TC-1A-EN-CCL,13 5/8 5M X 18 X133/8 X95/8X 3'/:IBT lift and3`/,IBT 3 1/2 susp,w/3"type H BPV, 6.990"EN,2-%npt control line feed-thru BHTA,Bowen,3 1/8 5M FE X 3"Bowen AZ Valve,Swab,WKM-M, t,,,, 3 1/8 5M FE,HWO,EE trim ir ."`"a mm r�m Valve,SSV,Wing,WKM-M, 3 1/8 5M,w/15"OMNI oper Tee,stdd,31/85MX g al 3 1/8 5M i i ■ ■ MMIIIIN mm KM MI Valve,Master,WKM-M, f . iff 3 1/8 5M FE,HWO,EE trim P4,--0‘6-' ` nu d ina 11111,1111• ,, n Valve,Master,WKM-M, r\ 3 1/8 5M FE,HWO,EE trim 4)O� i cft �O '■'r-all Adapter,FMC-ASP,13 5 8 5M Control line x2 N P / API clamp X3 1/8 5M,w/ Unihead OCT type 2,13 5/8 5M API • 6.990"extended neck pocket hub top X13 3/8 BTC casing bottom; .0 . =O. w/2-2"LPO on lower section,2-2 1/16 5M SSO on upper sectio;IP ``� P : ` internal lockpin assy Ila fil I Nola I.1 - - 1. Valve,WKM-M,21/165M �.® j 1 II- , 4)HWO,AAtrim l V l� • :(0).11--a'■�� �"r 1`(0j.1 'ice.. a o Starting head OCT, � Nott ti• i�ir-i..', 211/4 2M Hub x 24'/,1M �Va Ive,OCT-20,2"LPO,HWO, Hub w/2-2"LPO,prepped f/ Jim I 40111/1V _\ , AA trim 18"EN hanger °'.�� !IIS likI�: / �l-i.. Conductor housing � 1 • 04-=•- 24%1MHubX 'J 24"Buttweld • ' i II I 'LI 18" 1 13 3/8" 9 5/8" 3%" O lit ranite Point Platform 2017 BOP Stack(Kuukpik) 04/24/2017 IliIrnrp Al:urky LLA: Rig Floor itj 16" Pipe 111-111-11111! ,fri - t O ffil in in ail n 3./4 Shaffer 3 5/8 5M I i I III 1111'11 lit A ---*-1M- 11 2 7/8-5.5 Variables 2.83 13 5/8 5M -iE'_• . ' i�r Blind 2 1116 SM manual and HCR valve ^"IF FM,,,anual and HCR valve 111 III 111 111-111 1.76 I ���r Ii��`' ( ' ° `� Ill-Ill-ill lit Ili.-�I.�, T5'.��• Shaffer SL 13585M ■! 1 ' ® � ®® °• - = 2 7/8-5.5 Variables III III III'III III Drill deck 13.70' Riser 13 5/8 5M FE X 135/85M API hub • • E ct by ct 0 0,NI o,0,I1 ?Q 01 I411 �I d, d1 3 lie 0U 0 4 -01 01 01 p y, 1 , 1 I I w a' 1 4'11 i l F•�••1 ;-I i I;,..I al. of L •r1 0 U) =I 1 alsl 4141 I 0 -a-0 0- -1 131041 ..1;•1 , b a r pl�l tlgli l o ;I�I�I qlI °ayl�I �I wl a c 1 41 I al ,:I =i Si as) al I ol:El UII 91 1I =1 1 1 Da 4 Da -dm 10i i i i d• C) N y 1 1 I l y II I N N N 8 0:i,!r.!iii a e;idiof V I I I I, I I I N N r N a, ` a : To N — .moi 1 7 O) °o w!at wi&I&I WI'I coI 4p (J r N, a,a, a,a,a, a, a, N, N a ulu1VIVIVIUI(JIVIVI C I I 1 1 1 1 1 1 1 cn J O I qI 21,ti dI',12I dI d1 I Q gN L i�1CiaiSi01alCi:5i y1 LL 'a-) 1 � �hlNlOr� �{Nlorlol (6 =Y�io1g1=IOIoIolgl°iv' N L -.;.12121 161,10.1:o v to I I""I'l--l�1l„.1,,,.Iy1 0)'— — N ' le•e1y1"11eilell eyl0)lAI 1 111..41111..4173 11...411...4Da �i 11 1 I I I I I I 1:3 •� N• I OI..I NI MI vl v,l rol hl ool 0 - A 0 � A s.�,.......,,..,�,..,.,,... �i I l l l l l l l l 0 Da 0 I" ♦N .°_ Y . .U.)-' O s SD cn ;X -\, g� U cts 0 Da Da v1 1 1 1 1 1 1 1 1 r' co In =o =' _'e' _' e' _' _'d' al y1 yl to ,,,,iyl yl NI�1 `-.0 81.81.81.81.6181.8iejlei `a 1 1 1 1 1 1 1 1 1 ql wl`wl wl wl wl wl wi wl 010101010101010101 4 1.11;44A 74 11.141141 11 o!glglglglo!0 0 0 ;. gl,Onl in.inn,,Oni hl y,l,Onl Inn, ;olFel-"al;ol;=I,_oI,_ = ;=1 .r ''I t.y .e•.a•.wl l ;=I• .r r . 41 •'eI evI ell_reI e•d ell_eels rI ell bLJ U y I I I I I I I I , co 13 „Ic11e11vIv,Ielhlopigl �� CL 1 1 ii 1 1 1 1 1 = •o •.oa —1 a •S-1 oe0ie! V—I a+ x 0 0 Sal U 0 • CC: Cd =I yl 2! 2!A alaial N =I OI ,:14 N al 01 04 P. 1111A. III p 4,1 1 a,I I I nl I +I 1 1 I L ai i;,...i'rl -i pi di gi i dl ql qi Ai —O a D w ai I.41_1 di aI (� d o 1 p41• 1 j d 'ai aj w i cc J7• X. r G N t✓I i_1 al-a al 2Ip21 '� 11 I =I big (71 1�1 E .o �iI I 4I ji AI of t L ! y!I! (j) .p1 I I-I VI 1• I a)C of I.IQI 1 1 ►A J : ` .4I 1 i t i N N NY 8 0�o�..�r �� n�a�v'� ..1r11 -*iril o ell rulrii IIIIZ I I I It c C. N .d. U ,g' 1_l O dl dl dl d1 dl dl dl d1 dl O C_ A r g N N' N N' N' N' N N J N 2l241 21_1?I_l?1?I?l ® 3 0 vi ViU'U 'L'iVi� jvivj 0 N U- ♦Q I dl dl dl dl °'1 °'1 di dl j AN i 101013151010131/1 dj :• I al al'�I'�I ai a1'hI dlol to • II* 410Io1olploloiololV2.l L ,. iolololol0lo1olU1 y1 CSC I- I:I_ I. I sI:I: I=I �j ICICI I�ICI^"I°^°Iy1 �l 0)V 104 t� P4 _. -Q I�I�IrIaI�1�InIi1 j '.-. L1 1 1 1 1 1 1 t 1 1 QJ r O r ,p1IIIIillll 4-1 0I></ •C I I i I I i i I N L OA 2 ♦M q. a �r�// '.p n ;24 4) y 0) - ••'. d D Oo CO _0 •—• •M• _C ♦ CO CO O LO 0 ►1 r> I a I I I I t l i l l fes♦ kid— ♦ LA o a' a' a' a' a• a• a•a•a• ♦ �♦ ♦ 1 ;x dl d1 dl dl dl d1 di I 1 a' aa. a. a. aa. o _ o 0!0!010!010101-0101, , , C6 1 I i I i i I I I a)I uI a%1)l aI aI r'i=%I 21 0101(.)1(.)1 U101010101 d yi a,i y1 y1 yl a! p,l =I. yl 4 0,010,0.010,010101 0,00,0,00,000, - '.7,1ii,1u12121Q1F1,12121 ;aI;aI;a1 al"-al;al;ai;01;al in r41 ell a ilril ell rul rill et!ril 0 y 1 1 1 1 1 1 1 1 1 (24 ag ..Irllrildlunl.pli..lco!ol, b a ,. I I I 1 I I i I I r. $ _ 'o CO ,.y p 3-. wH i Al d x 1 o . u • i E ta III C F 9,I �1 al 9,13 al dI dl ,� °•1 °N °9 cI N o1 °1 121 /1 a Oi jOjujP+ uj�i01 L1 yl 1 1 �1 I 1 I O it j °' 1 -I I j j t- gl 19,I qI 711 '1 1 'CI O -o Q. -0 I l -'1.11 �I I I ii_ n I y of�l pl;yl y 1 al Wj 9,4 °. a 2 12I- • Vlul�lgi 01911 N d ✓ ,-,,I I al ql✓ AI 31..1 if of I41-t1 .1,I I •i• • -o - - �1 -.I0I al °01 I C Cp 01 1:0170 (J1 "1 1 b• 0 'Q. MOI I I I ."I I 1 1 I 1 I 1.III I. c .. I I I ii. 1 I I NCr) a ajoj.rjr,jA ..,Iviy+j Z N Y 7 •.j r+j r+1 1= r�j r�1 1 4 I I I I4 I I 1 ft rV 9, O. P r a a LAN 9, u : I .`� a -' F.,' '. D.< 00 111" u g v!-.0!,,!..0! 1.019!.01 °I 4) y all dlaial °1HININIyl ii if cc 0. 0.A, uucdo � Q �v 1 1 1 1 IIII IO c cn J I9,I9,I0,1y19,I9,1y14,1 I LL Y AAO (NI IOM�I�IUIVI�I ql I O' 1';l'NIII'-INII'"111 c U 9,10101al alviol °91I.al a) wlolol0lololol01�1,1 n•v+,o.o,v,.v+.o,u, y. O I. I_ I i_ - I bl 9,i I.-.I-I.la?I..IrrIL?I all - 1-1-1 "I "I i i 1-1 I co r N jrl,rl.'r.".m•(-4.".i. ) I I I I I I i l iD4 1%.4 4 0, Ca 1 11 ill 1 1 1 1 r— U 4I 1 1 1 I I 1 1 I I o b4 0 .n d• C L p 7 %- N (0 (h a Q) ,.L — G A .A., w m *. d 0 .Q X77 'M _ �I CII m T O d u 11 CD ba r 11 > _ r`o �� a o ! ! ! ! ql I I�l,l e I . al al al al dl 9,i 9,j 01 01 ,,, a, a, a, a, a• a. a• o• o• —4E— a° 01010101010IDIVIVI 9,1' 9,i 9,i 9,i 9,j 9,j 2.,1'21'2i A•b•b•A•A• A• A•A• t910tOic.,t0tU1U1(..)lCAI .aj7,1.:;17,-,j.aj.aj.9,i. 7,j r 0.olol0lolo0-0.0010. '� ojoloj8i8i8iojoiol L O. _ _- - I. 1: 1: Ic I. I: I: 1. 1 ^'1^,Irz"IG'1•�'I^1^'1^'1"1 by r. .� . .. r. .. rtlrolr�Ir�in.nlr�•r�, . U II 1 I I 1 III C I I I I 1 I I 1 1 o '"I"lmIv �� jM+1'°ll°°lal .,.., % t I I I 1 I I 1 I •— ) IS a a A to. at o U • • Choke Manifold Valves 2 " 3" To Shaker 3" Panic To Gasbuster Li31/8"] L _......2 1/16" " ----111., _M_ 0 21/16" , , 1 ±), (8 2 1/1 l_ 2 1/16" N �/ -► / 31/8" / � rn �`© / N L _- ��� ,� o �� I A 2 1/16" 2 1/16" Manual Choke > Automatic Choke 2 1/16" Inlet Pressure Sensor 3" 3" 5,000 PSI Choke Manifold Kuukpik Drilling Rig 5 RED = 3 1/18" 5,000 PSI VALVES AND LINES BLUE = 2 1/16" 5,000 PSI VALVES Kuukpik Drilling Rig 5 Choke Manifold fir. . . Cm ..,....4., 1_ #a .--,,,„. u b. a #1 #2 IIL C.-1. #15 . N Kuukpik Drilling Rig 5 Choke Manifold • • Kuukpik 5 BOP Test Procedure tlilcarp Alaska,LLCAttachment#1 Attachment #1 Hilcorp Alaska LLC. Rolling BOP Test Procedure: Kuukpik 5 — Oil/Gas Producers, Water/Gas Injectors Initial Test(i.e.Tubing Hanger is in the Wellhead) If BPV profile&lift threads were deemed good, but still unable to get good tests 1) If both set of threads appear to be bad and unable to hold a pressure test and/or a penetrator leaks, notify Operations Engineer(Hilcorp), Guy Schwartz (AOGCC-guy.schwartz@alaska.gov),Jim Regg (AOGCC-jim.regg@alaska.gov) and Michael Quick (AOGCC—Michael.quick@alaska.gov)via email explaining the wellhead situation prior to performing the rolling test. If on Federal land contact BLM representative Amanda Eagle (aeagle@blm.com) and Mutasim Elganzoory (melganzoory@blm.com). AOGCC and BLM may elect to send an inspector to witness. As outlined and approved in the sundry, proceed as follows: 2) With stack out of the test path, test choke manifold per standard procedure 3) Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down-hole and not leaking anywhere at surface.) Kill and choke line valve will also be tested during this time. 4) During these tests the test chart needs to be set to 60 min instead of 12 hours so chart shows a better graph. Need to station hands in cellar going over all connections on the BOPs looking for the slightest leak. Also need a man looking down the hole to confirm that the BOPs are not leaking. Test# 1=Annular, HCR Choke, and HCR Kill. Test#2=Upper Pipe Rams, HCR Choke, and HCR Kill. Test#3=Upper Pipe Rams, Manual Choke, and Manual Kill. Test#4=Lower Pipe Rams. 5) Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. 6) Once the BOP ram and annular tests are completed, test the remainder of the system following the normal test procedure (floor valves,gas detection, etc.) 7) Record and report this test with notes in the remarks column that the tubing hanger/BPV profile/penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 8) Pull hanger to surface. (Making tubing cuts as necessary to free tubing). CBU to displace annulus and tubing with kill weight fluid and sweep off any oil cap that may be present. 9) If a rolling test was conducted, remove the old hanger, MU new hanger or test plug to the completion tubing. Re-land hanger(or test plug) in tubing head. Test BOPE as per Kuukpik's standard test procedure. Or POOH laying down all the tubing and use the normal test plug to finish the tests that were not completed as per regulatory approval. • • Kuukpik 5 BOP Test Procedure Metal)Alaeka,i.i.c Attachment#1 If the tubing hanger won't pressure test due to either a penetrator leak or the BPV profile is eroded and/or corroded and BPV cannot be set with tree on. Profile and/or landing threads must be prepped while tree is off. Worst Case: BPV profile and landing threads are bad. 1) Attempt to set BPV through tree and test. May have to tap out if scaled up or paraffined up if well is not dead may have to be done w/ pressure lubricator (diesel or acid could help) 2) If unsuccessful, or BPV profile is eroded and well is dead. Best practice is to have two barriers a. Fluid column b. Set wire line plug or tag fluid level with slick line to establish static fluid level or shoot fluid level with an echo meter gun. 3) Shoot off tubing very shallow ( 300-500' most likely just under SSSV if applicable) 4) Spear hanger w/ upside down cup provided by fishing company 5) Proceed to get best test we can achieve against cup and confirm no visual leaks on all flanges of BOPE 6) Notify Hilcorp Anchorage Operations Engineer and AOGCC of situation 7) Pull hanger and cut off stub 8) P/U test plug and set same. 9) Perform complete BOPE test as per Kuukpik's standard procedure 0 • a' 0 / > � 2 7 6 Q CO _ 7s 022 / \ 2 k0 § / « � E ® § ' 2 ca / § i �� / ƒ < k / / � XU > > _ x �� g a ee co a.5 t•-• / / csi § .q n -a a) a) c 2 c q C 2 CO CU a_ S 0 2 � c o C) Z CD /\ $ C / 2 q / 5 13 @ 2 § O / a) E 11. mc. % / co � c co 0O S \ -0 CD a) k \ \ k CD � E % ° a) 2 c 2 0 2 og a 2- / L. a a) C § »7 coCa § § / / ■ CO w0 2 ILU > 2 $ o 2 2 § Et �a @ co cp 4 L < / \ 0 \ / 0. R x % t E 0 _ 0 R ■ ° CO k � m .2 0 ® 0 as k.0 x = / a. a) 7 67 s. � w / � « 0 CD .. _ % \ E 0 § e 0 u E 21 0 Cl) co \ 0 a) 2 OF rot THE STATE Alaska Oil and Gas 11,i,`? Of A LASKI& Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 "4 Main: 907.279.1433 ALA off' S*P Fax: 907.276.7542 www.aogcc.alaska.gov Paul Mazzolini Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt St 22-13RD3 Hilcorp Alaska, LLC Permit to Drill Number: 217-086 Surface Location: 2379' FNL, 1375' FWL, SEC. 13, T1ON, R12W, SM, AK Bottomhole Location: 958' FSL, 75' FEL, SEC. 18, T1ON, R11 W, SM, AK Dear Mr. Mazzolini: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition,the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05,Title 20,Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED this t244`'day of July, 2017. RECEIVED STATE OF ALASKA AL.OIL AND GAS CONSERVATION COMMIIJN 2017 N PERMIT TO DRILL O�CC 20 AAC 25.005 la.Type of Work: 1 b.Proposed Well Class: Exploratory-Gas 0 Service- WAG ❑ Service-Disp ❑ lc.Specify if well is proposed for: Drill 0 Lateral 0 Stratigraphic Test ❑ Development-Oil 0# Service- Winj 0 Single Zone 0 , Coalbed Gas 0 Gas Hydrates 0 Redrill 2 - Reentry 0 Exploratory-Oil ❑ Development-Gas 0 Service-Supply 0 Multiple Zone 0 Geothermal 0 Shale Gas 0 2.Operator Name: 5. Bond: Blanket Q . Single Well ❑ 11.Well Name and Number: Hilcorp Alaska,LLC . Bond No. 022035244 • Granite Pt St 22-13RD3 3.Address: 6.Proposed Depth: 12.Field/Pool(s): 3800 Centerpoint Drive,Suite 1400,Anchorage,AK 99503 MD: 13,169'. TVD: 10,913'. Granite Point Field - 4a. Location of Well(Governmental Section): 7.Property Designation: Middle Kenai Oil Pool • Surface: 2379'FNL,1375'FWL,Sec 13,T1ON,R12W,SM,AK ADL018761 • Top of Productive Horizon: 8.DNR Approval Number: 13.Approximate Spud Date: 2412'FNL,1995'FEL,Sec 13,T1ON,R12W,SM,AK N/A 7/15/2017 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 958'FSL,75'FEL,Sec 18,T1ON,R11 W,SM,AK 5089 • 4076'to nearest unit boundary 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL(ft): 115' 15.Distance to Nearest Well Open Surface: x-263405 y- 2544551 Zone-4 GL/BF Elevation above MSL(ft): (6 ,7.5 to Same Pool: 2317'to GP 31-13 16.Deviated wells: Kickoff depth: 8,500 feet 17.Maximum Potential Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 69.6 degrees Downhole: 5347 Surface: 2837 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 6" 5" 23.2# L-80 SLIJ-II 8,269' 4,900' 4,884' 13,169' 10,913' 314 sx 15.3# 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): 13,934' 10,811' N/A 11,142' 9,752' N/A Casing Length Size Cement Volume MD TVD Structural 294' 26" Driven 294' 294' Conductor 600' 18" 1050 sx 600' 598' Surface 3,989' 13-3/8" 668 sx 3,989' 3,973' Intermediate 6,643' 9-5/8" 8645 sx 6,643' 6,616' Production 5,017' 7" 9755 sx 11,377' 9,907' Liner 2,707' 4-1/2" Slotted Liner 13,922' 10,808' Perforation Depth MD(ft): 10,534'-11,650' Perforation Depth TVD(ft): 9,351'-10,055' Hydraulic Fracture planned? Yes 0 No Q 20. Attachments: Property Plat ❑ BOP Sketch 7 Drilling Program ✓ Time v.Depth Plot 7 Shallow Hazard Analysis— Diverter Sketch — Seabed Report Drilling Fluid Program 7 20 AAC 25.050 requirements 7 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Monty Myers Authorized Name: Paul Mazzolini Contact Email: mrtivers(7hiIcorp.com Authorized Title: Drilling Manager Contact Phone: 777-8431 O�e �o/ Authorized Signature: ` • Date: z0/ 7 Commission Use Only Permit to Drill API Number: Permit Approval See cover letter for other Number: al 7-O&c 50- 7.33-0/00'3E-Q3 -00 Date: 7-I1,_\Z requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: (vr Other: x' 2 I j P`�iv 1-S;, `2 00 pc,t ,.,„it . Samples req'd: Yes ❑ No V Mud log req'd:Yes❑ No!lir H2S measures: Yes nu( No❑ Directional svy req'd:Yes E ' No❑ At_x, t1/41l'6t" C.,04-0 ."Tlfl- As' ,c i A Spacing exception req'd: Yes 0 Nog Inclination-only svy req'd:Yes 0 No[/> 20 SRL 2c.c (c..x4./.. 4" a6 Post initial injection MIT req'd:Yes 0 No ,.• APPROVED BY .4 10-- It-4 Approved by: �� COMMISSIONER THE COMMISSION Datesubmit Form and iu-4u I rcewse. sit T r It I all fur 24 nrunlhs frurn the ddte of dppruval per 20 AA 25.005(y) Attachments in Duplicate ' N��� ��{1f��- Cl m IN'A I '�4 VV7 Ms 71,2, , • Hilcorp Alaska, LLC P.O. Box 244027 int • Monty Myers Anchorage,AK 99524-4027 Drilling Engineer Tel 907 777 8431 Email mmyers@hilcorp.com Hilcorp Energy Company 6/6/2017 Commissioner RECEIVED Alaska Oil &Gas Conservation Commission 333 W. 7th Avenue JUN 0 6 2017 Anchorage, Alaska 99501 AOGCC Re: GP 22-13RD3 Dear Commissioner, Enclosed for your review is an application for permit to drill GP 22-13RD3. GP 22-13RD3 is an oil production well planned to be re-drilled in a South-easterly direction from the existing GP 22-13RD2 utilizing the existing casing program down to 8500' MD/8154'TVD. At 8500' MD the parent wellbore will be sidetracked and new wellbore drilled penetrating several Tyonek targets. A 4869'x 6"open hole section is planned. A 5" 23.2# L-80 SLIJ-II prod liner will be run, cemented, and perforated based on data obtained while drilling the interval. The well will be completed with a 2-7/8"X 2-3/8"gas lift completion. Drilling operations are expected to commence approximately July 15th, 2017. If you have any questions, please don't hesitate to contact myself at 777-8431 or Paul Mazzolini at 777-8369. Sincerely, • Monty Myers Drilling Engineer Hilcorp Alaska, LLC Page 1 of 1 • s Hilcorp Alaska, LLC GP 22-13RD3 Drilling Program McArthur River ro dby: Mr liraTag Revision 0 May 24, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 [likorp Alaska,LLC Contents 1.0 Well Summary 2 2.0 Management of Change Information 3 3.0 Tubular Program 4 4.0 Drill Pipe Information 4 5.0 Internal Reporting Requirements 5 6.0 Planned Wellbore Schematic 6 7.0 Drilling Summary 7 8.0 Mandatory Regulatory Compliance/Notifications 8 9.0 R/U and Preparatory Work 10 10.0 BOP N/U and Test 11 11.0 Mud Program and Density Selection Criteria 12 12.0 Whipstock Running Procedure 13 13.0 Whipstock Setting Procedure 15 14.0 Drill 6"Hole Section 17 15.0 Run 5"Production Liner 20 16.0 Cement 5"Production Liner 23 17.0 Wellbore Clean Up & Displacement 27 18.0 Run Completion Assembly 28 19.0 RD 28 20.0 BOP Schematic 29 21.0 Wellhead Schematic 30 22.0 Days vs Depth 31 23.0 Geo-Prog 32 24.0 Anticipated Drilling Hazards 33 25.0 Rig Layout 34 26.0 FIT Procedure 35 27.0 Choke Manifold Schematic 36 28.0 Fluid Flow Diagrams 37 29.0 Casing Design Information 40 30.0 6"Hole Section MASP 41 31.0 Plot(NAD 27) (Governmental Sections) 42 32.0 Slot Diagram (As Built) (NAD 27) 43 33.0 Directional ( P )05 Program w 45 g • GP 22-13RD3 Drilling Procedure Rev 0 Ililcorp Alaska,LLC 1.0 Well Summary Well GP 22-13RD3 Pad&Old Well Designation Sidetrack of existing well GP-22-13RD2 (PTD#196-075) Planned Completion Type 5"23.2#L-80 Liner, 2-3/8"x 2-7/8"Tubing GL Comp Target Reservoir(s) Tyonek Producer C2-C7 Planned Well TD, MD/TVD 13169' MD/ 10913' TVD PBTD, MD/TVD 13069' MD/ 10878' TVD Surface Location(Governmental) 2379' FNL, 1375' FWL, Sec 13, T10N, R12W, SM,AK Surface Location(NAD 27) X=263405.53,Y=2544551.71 Surface Location(NAD 83) Top of Productive Horizon (Governmental) 2412'FNL, 1995'FEL, Sec 13,T10N,R12W, SM,AK TPH Location(NAD 27) X=265318.53,Y=2544479.54 TPH Location(NAD 83) BHL(Governmental) 958'FSL, 75'FEL, Sec 18, TION, R11W, SM,AK BHL(NAD 27) X=267349.09,Y=2542527.9 BHL(NAD 83) AFE Number 1711827D AFE Drilling Days AFE Drilling Amount $5.59 MM Work String 4-1/2" 16.6# S-135 CDS-40 (From Saxon) RKB—AMSL 115' MSL to ML 75' BOP Equipment 13-5/8" 5M Hydril"GK"Annular BOP 13-5/8" 5M Cameron Type U Double Ram 13-5/8" 5M Cameron Type U Single Ram Page 2 Revision 0 May,2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Ilileurp Alaska.I.IA: 2.0 Management of Change Information Hilcorp Alaska, LLC Hilcorp Lamy Commay Changes to Approved Permit to Drill Date: May 25, 2017 Subject: Changes to Approved Permit to Drill for GP 22-13RD3 File#: GP 22-13RD3 Drilling Program Any modifications to GP 22-13RD3 Drilling Program will be documented and approved below. Changes to an approved APD will be communicated and approved by the AOGCC prior to continuing forward with work. Sec Page Date Procedure Change Approved Approved By By Approval: Drilling Manager Date Prepared: Monty M Myers 5.25.2017 Drilling Engineer Date Page 3 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Ilikurp Alaska, 3.0 Tubular Program Hole Section OD (in) Wt(#/ft) Coupl OD ID (in) Drift(in) Grade Conn Top Bottom 6" 5" 23.2 5" 4.044 6.059 L-80 SLIJ-11 4900 13169 4.0 Drill Pipe Information Hole OD (in) ID (in) TJ ID TJ OD Wt Grade Conn " a ` ' Collapse Tension Section (in) (in) (#/ft) (psi) (psi) (k-lbs) 6" 4-1/2" 3.826 2.6875" 5.25" 16.6 S-135 CDS40 17,693 16,769 468k All casing will be new, PSL 1 (100%mill inspected, 10% inspection upon delivery to TSA in Fairbanks). Page 4 Revision 0 May, 2017 • i GP 22-13RD3 Drilling Procedure Rev 0 Ililcurp,11a.ka. 5.0 Internal Reporting Requirements 5.1 Fill out daily drilling report and cost report on Wellez. i. Report covers operations from 6am to 6am ii. Click on one of the tabs at the top to save data entered. If you click on one of the tabs to the left of the data entry area—this will not save the data entered, and will navigate to another data entry tab. iii. Ensure time entry adds up to 24 hours total. iv. Try to capture any out of scope work as NPT. This helps later on when we pull end of well reports. 5.2 Afternoon Updates v. Submit a short operations update each work day to pma77olini(&,,hilcorp.com, mmyers@hilcorp.com and cdinger@hilcorp.com 5.3 5am Weekend Update vi. Submit a short operations update each weekend and holiday to whoever is assigned weekend or vacation duty. Details will be sent before each weekend or holiday. vii. Copy pmazzolini@hilcorp.com, and mmyers@hilcorp.com 5.4 EHS Incident Reporting viii. Notify EHS field coordinator. 1. This could be one of(3) individuals as they rotate around. Know who your EHS field coordinator is at all times, don't wait until an emergency to have to call around and figure it out!!!! a. Leonard Dickerson: 0: (907) 777-8317 C: (907)252-7855 b. Mark Tornai: 0: (907)283-1372 C: (907) 748-3299 c. Thad Eby: 0: (907) 777-8317 C: (907)602-5178 2. Spills: a. Keegan Fleming: 0:907-777-8347 C:907-350-9439 ix. Notify Drlg Manager 1. Paul Maz7olini: 0: 907-777-8369 C: 907-317-1275 x. Submit Hilcorp Incident report to contacts above within 24 hrs 5.5 Casing Tally xi. Send final"As-Run"Casing tally to mmyers@hilcorp.com and cdinger@hilcorp.com 5.6 Casing and Cmt report xii. Send casing and cement report for each string of casing to mmyers@hilcorp.com and cdinger@hilcorp.com Page 5 Revision 0 May, 2017 H • • GP 22-13RD3 Drilling Procedure Rev 0 Irilcorp Alaska,1.1.1: 6.0 Planned Wellbore Schematic Granite Point Platform 11 Well: Granite Pt St 22-13RD2 Last Completed:Future PROPOSED PTD:XXX-XXX API: 50-733-20095-XX i CASING DETAIL Size Wt Grade Conn ID Top Btm 26" Inside Conductor Surf 294' 18" 70.59 B Surf 600' 13-3/8" 61 1-55 BTC 12.515" Surf 3,989' 9-5/8" 40&43.5 N-80 BTC&8md Surf 6,643' 81 I 7" 29 L-80 BTC 6.184" 6,360' ±8,500'(KOP) 5" 23.29 1-80 SLI1-11 4.044 ±4,900' 13,169' A it K No Depth(MD) Depth(ND) ID Item 1 ±4,900' ±4,884' ZXP liner hanger/packer >A 6 2 ±8,500' ±8,154' KOP 3 ±4,900'—13,169' ±10,913' 5"23.2#L-80 SLIT-II L t CEMENT DETAIL No TOC Depth TOC Depth Volume Item (MD) (TVD) C5 Sord ±8,300' ±8,037' 78 bbls 15.3 ppg Class G cement w/Y2 bbl Cemnet LCM CO Simi C7 Sun! Y PLOD:13,069' T0:13,160' MAKHG.E ANGLE=70' Page 6 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 ftiIcorp Ala.ka, 7.0 Drilling Summary GP 22-13RD3 is an oil production well planned to be re-drilled in a South-easterly direction from the existing GP 22-13RD2 utilizing the existing casing program down to 8500' MD/8154' TVD. At 8500' MD the parent wellbore will be sidetracked and new wellbore drilled penetrating several Tyonek targets. A 4869' x 6"open hole section is planned. A 5"23.2#L-80 SLIJ-II prod liner will be run,cemented,and perforated based on data obtained while drilling the interval. The well will be completed with a 2-7/8"X 2-3/8"gas lift completion. Drilling operations are expected to commence approximately July 15th,2017. All waste & mud generated during drilling and completion operations will be hauled to the Kenai Gas Field G&I facility for disposal/beneficial reuse depending on test results. J A separate sundry notice will be submitted to cover P&A and wellbore preparation for the sidetrack and for running the completion assembly General sequence of operations pertaining to this approved drilling procedure: 1. Kuukpik 5 will be over slot 22(GP 22-13RD2)to decomplete and P&A well under separate sundry. ' So.,.,r>c-- 311- 11; 2. DP should be stood back in derrick 3. PU whipstock, and mills and TIH to CIBP 4. Orient whipstock and set at 65 deg right of highside. 5. Mill 6"window and 20' of new formation at 8500'. 6. POOH and LD mills. PU directional BHA and TIH to window. 7. Swap well to 9.0 ppg oil based drilling mud 8. Perform FIT to 12.5 ppg EMW 9. Drill 6" production hole from 8520' to 13169' MD, performing short trips as needed 10. Perform short trip and condition mud. POOH 11. LD Directional Tools. RIH w/ 5" liner. Set liner and cement. Circ wellbore clean. 12. POOH, laying down DP and liner running tools, 13. PU 5"casing scraper assembly and TIH to landing collar. 14. Circ casing clean. POOH laying down DP. 15. Run 2-7/8" completion. (Covered under separate sundry) 16. Land hanger and test. 17. ND BOPE,NU tree and test void Page 7 Revision 0 May,2017 • I 14GP 22-13RD3 Drilling Procedure Rev 0 Hiker!):Uaeka,LLC 8.0 Mandatory Regulatory Compliance / Notifications Regulatory Compliance Ensure that our drilling and completion operations comply with the below AOGCC regulations. If additional clarity or guidance is required on how to comply with a specific regulation, do not hesitate to contact the Anchorage Drilling Team. • BOPs shall be tested at(2) week intervals durin the drilling of GP 22-13RD3. Ensure to provide AOGCC 48 hrs notice prior to testing BOPs. • The initial test of BOP equipment will be to 250/3500 psi & subsequent tests of the BOP equipment will be to 250/3500 psi for 5/5 min(annular to 50%rated WP, 2500 psi on the high test for initial and subsequent tests). Confirm that these test pressures match those specified on the APD. • If the BOP is used to shut in on the well in a well control situation, we must test ALL BOP components,utilized for well control prior to the next trip into the wellbore. This pressure test will be charted same as the 14 day BOP test. • All AOGCC regulations within 20 AAC 25.033 "Primary well control for drilling: drilling fluid program and drilling fluid system" • All AOGCC regulations within 20 AAC 25.035 "Secondary well control for primary drilling and completion: blowout prevention equipment and diverter requirements" • Ensure AOGCC approved drilling permit is posted on the rig floor and in Co Man office. Variance Requests: o Hilcorp would like to request a variance to regulation 20 AAC 25.035(e)(4)(F)(i) which states - "the outlets must be at least two inches in nominal diameter, except that for rotary drilling rig operations, if the operation has a maximum potential surface pressure of greater than 3,000 psi, the nominal diameter of the choke outlets must be at least three inches". o The calculated MASP for this wellbore when completely evacuated to gas is 4256 psi. However, for Cook Inlet Operations, we assume that the well can never flow 100% gas, due to the water in the reservoir. We reduce this MASP calculation to 2837 psi which assumes that only 2/3 of the wellbore is evacuated to gas and 1/3 to 9.0 ppg reservoir fluid. o Hilcorp would like to request to have 2-1/16" outlets on the choke line and kill line due to this assumption MeV' C A=k-Ce V.0.) 4 -100?) ase 2,-,1 E7 C.L."'R. OV-3 Lite 4E u., 0 V- 12.0 Page 8 Revision 0 May, 2017 • GP 22-13RD3 Drilling Procedure Rev 0 I lilcorp kIu,ka,LLC Summary of BOP Equipment and Test Requirements Hole Section Equipment Test Pressure(psi) • 13-5/8"Shaffer 5M annular • 13-5/8"5M Shaffer SL Double gate Initial Test:250/3500 • Blind ram in bottom cavity (Annular 2500 psi) 6" • Mud cross • 13-5/8"5M Shaffer SL single gate Subsequent Tests: • 3-1/16"5M Choke Manifold 250/3500 • Standpipe,floor valves,etc (Annular 2500 psi) • Primary closing unit: Control Technology Accumulator, 3000psi, 5 station, 170 gallon reservoir, 4 nitrogen backups and 12 bladder bottles. • Primary closing hydraulic pressure is provided by an electrically driven triplex pump. Secondary back-up is an air pump, and tertiary emergency pressure is provided by bottled nitrogen. Required AOGCC Notifications: • Well control event (BOPS utilized to shut in the well to control influx of formation fluids). • 48 hours notice prior to spud. • 48 hours notice prior to testing BOPs. • 48 hours notice prior to casing running& cement operations. • Any other notifications required in APD. Additional requirements may be stipulated on APD. Regulatory Contact Information: AOGCC Jim Regg/AOGCC Inspector/(0): 907-793-1236/Email:jim.regg@alaska.gov GuySchwartz/Petroleum Engineer/(0): 07-7 3-1229 9 6/ 907-301-4533 /Email: u .schwartz alaska. ov g ( ) (C): gY @ g Victoria Loepp/Petroleum Engineer/(0): 907-793-1247/Email: victoria.loepp@alaska.gov Primary Contact for Opportunity to witness: AOGCC.Inspectors@alaska.gov Test/Inspection notification standardization format: http://doa.alaska.gov/ogc/forms/TestWitnessNotif.html Notification/Emergency Phone: 907-793-1236 (During normal Business Hours) Notification/Emergency Phone: 907-659-2714 (Outside normal Business Hours) Page 9 Revision 0 May, 2017 1 H • _ • GP 22-13RD3 Drilling Procedure Rev 0 tlilsorr Alaska,I.1A 9.0 R/U and Preparatory Work 9.1 Separate sundries will be submitted that will include the following: • Pull tubing • P&A lower perfs with a cement plug • Set CIBP 9.2 Mix mud for 6"hole section. 9.3 Verify 4.5" liners installed in mud pump#1 and 5.5" liners installed in pump #2. • Ellis Williams WH-1000 Pumps are rated at 3500 psi (100%) with 4.5" liners and can deliver 171 gpm at 86 spm. • TSM 1000 Pumps are rated at 3500 psi (100%) with 5.5" liners and can deliver 229 gpm at 86 spm. • Ideal pump rate for drilling will be 250 gpm. Both pumps running at 60 spm should achieve this. Pump#1 Ellis Williams WH1000 10" Stroke Pump#2 TSM 1000 9" Stroke 96% Efficiency Max psi 3500 psi 96% Efficiency Max psi 3500 psi Liner Size bbls/stroke Liner Size bbls/stroke 4.5 0.0472 5.5 0.0635 Strokes/minute bpm gpm Strokes/minute bpm gpm 20 0.94 40 20 1.27 53 40 1.89 79 40 2.54 107 60 2.83 119 60 3.81 160 86 4.06 171 86 5.46 229 100 4.72 198 100 6.35 267 120 5.67 238 120 7.62 320 140 6.61 278 150 7.08 297 Page 10 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 lliIcorp.Alaska,1.1.1: 10.0 BOP N/U and Test 10.1 * BOPE was NU and tested on prior decompletion sundry. We will test BOPE on 7 day cycle until the window is milled, at that point we will switch to the 14 day test cycle. Continue on to step 11. 10.2 N/U 13-5/8"x 5M BOP as follows (top down): • 13-5/8"x 5M Shaffer annular BOP. • 13-5/8" Shaffer Type "SL"Double ram. (2-7/8" X 5"VBR in top cavity, blind ram in btm cavity) • 13-5/8"mud cross • 13-5/8" Shaffer Type "SL" single ram. (2-7/8"X 5"VBR) • N/U pitcher nipple, install flowline. • Install (2) manual valves on kill side of mud cross. Manual valve used as inside or"master valve". • Install (1)manual valve on choke side of mud cross. Install an HCR outside of the manual valve. 10.3 Run BOP test assy, land out test plug (if not installed previously). • Test BOP to 250/3500 psi for 5/5 min. Test annular to 250/2500 psi for 5/5 min. • Ensure to leave "A" section side outlet valves open during BOP testing so pressure does not build up beneath the test plug. Confirm the correct valves are opened!!! • Test VBRs on 4-1/2"test joint. • Ensure gas monitors are calibrated and tested in conjunction w/BOPE. 10.4 R/D BOP test assy. 10.5 Continue mixing mud for 6"hole section. 10.6 Set wearbushing in wellhead. Ensure ID of wearbushing> 7-5/8". Page 11 Revision 0 May,2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Ilileorp Alaska,LLC 11.0 Mud Program and Density Selection Criteria 11.1 6" Production hole mud program summary: Primary weighting material to be used for the hole section will be barite to minimize solids. We will have enough barite on location to weight up the active system 1ppg above highest anticipated MW in the event of a well control situation. Canrig PVT will be used throughout the drilling and completion phase. Remote monitoring stations will be available at the driller's console, Co Man office, Toolpusher office, and mud loggers office. System Type: 9.0 ppg 80/20 Enviromul MOBM Properties: MD Mud Weight Viscosity PV YP HTHP WPS ES (PPg) 8,500—13,169' 9.0-9.5 50-80 25-35 15-22 <5 250-270K >580 System Formulation: 80/20 Enviromul MOBM Product Concentration LVT 0.662 bbl Water .172 bbl INVERMUL NT 4 ppb EZ MUL NT 4 ppb GELTONE V 6-10 ppb Lime 7 ppb DURATONE HT 2 ppb Calcium Chloride 21 ppb BAROID 41 9.0 ppg(as needed) BARACARB 5 3-5 ppb BARABLOK 2 ppb BAROTROL PLUS 4 ppb 11.2 Program mud weights are generated by reviewing data from producing & shut in offset wells, estimated BHP's from formations capable of producing fluids or gas and formations which could require mud weights for hole stabilization. 11.3 A guiding philosophy will be that it is less risky to weight up a lower weight mud than be overbalanced and have the challenge to mitigate lost circulation while drilling ahead. Page 12 Revision 0 May,2017 • • GP 22-13RD3 Drilling Procedure Rev 0 IliIcor')Alaska, --- 12.0 Whipstock Running Procedure Section 12.1 through 12.5 is covered under decompletion sundry, drilling proceed to 12.6 12.1 M/U window milling assembly and TIH w/4-1/2" DP out of derrick. • Use an 6"taper mill and a 6" string mill above to ensure whipstock assy will pass freely. • Ensure BHA components have been inspected previously. • Caliper and drift all BHA components before running them in the hole. • Drift DP prior to RIH. • Lightly wash and ream any tight spots noted. 12.2 TIH to CIBP (8500' MD). Note that this was a wireline measurement so actual depth tagged may vary slightly. Keep up with the# of joints picked up so we know where we are. 12.3 Pressure test casing to psi/ 30 min. Chart record casing test &keep track of the amount of fluid pumped. Stage up to,1--506 psi in 500 psi increments. VA-SG_ , ZbCL 12.1i1 12.4 CBU & circ at least (1) hi-vis sweep to remove any debris created by the clean out run. Anything left in the wellbore could affect the setting of the Whipstock. 12.5 TOH. 12.6 Make up mills on a joint of HWDP. 12.7 RIH & set in slips. 12.8 Make up float sub, install float. 12.9 Leave assembly hanging in the elevators, and stand back on floor. 12.10 Bring Whipstock to rig floor on the pipe skate. Do not slam into bottom of Whipstock with pipe skate. 12.11 Pick up Whipstock per Baker rep using the Baker Whipstock handling system using air hoist. Allow assy to hang while Baker Rep inspects and removes shear screws as needed and any safety screws. Note: Anchor should be pinned with 6 shear screws initially. Shear screws are rated for 6,630 lbs each. REMOVE 3 screws for a set down shear of 6,630 x 3=19,890 lbs. Note: Attach mills to Whipstock with (1) 35k mill shear bolt. 12.12 If needed, open BOP Blinds. Page 13 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 11ilcorp Ala,kn,I.I I 12.13 Run the Whipstock in the hole, install safety clamp as per Baker Rep, and install hole cover wrap. 12.14 Release pick up system at this point, Make up mills. 12.15 With the top drive,pick the assembly and position the starting mill to align with the hole in the slide. The Baker Rep will instruct the driller when the slot is lined up, the shear bolt then can be made up by the Baker Rep. 12.16 The assembly can now be picked up to ensure that the shear bolt is tight. 12.17 Remove the handling system. 12.18 Slowly run in the hole as per Baker Rep. Run extremely slow through the BOP & wear bushing. 12.19 Run in hole at 1 I/2 to 2 minutes per stand. 12.20 Fill every 30 stands or as needed, do not rotate or work the string unnecessarily. 12.21 Call for Baker Rep. 15 — 10 stands before getting to bottom. 12.22 Orient at least 30' —45' above the CIBP. 7"29#Csg—WindowMaster G2 On BTA BHA#1 Connection Length O.D.. BOTTOM TRIP ANCHOR 3'/:IF-Box X Bottom Guide 3.21' 6.18" WINDOW MASTER WHIPSTOCK Shear Bolt X 3'/IF-Pin 14.6' 6.00" WINDOW MILL 3-1/2 Reg-Pin X Mill 1.5' 6.63" LOWER WATER MELON MILL 3-1/2 IF-Box X 3-1/2 Reg-Box 5.5' 6.50" FLEX JOINT 3-1/2 IF-Box X 3-1/2 IF-Pin 6.6' 4.75" UPPER WATER MELON MILL 3-1/2 IF-Box X 3-1/2 IF-Pin 5.8' 6.63" 1 JT HWDP 3-1/2 IF-Box X 3-1/2 IF-Pin 30' 5.25" MWD Survey Tool 3-1/2 IF-Box X 3-1/2 IF-Pin 3' 4.75" UBHO 3-1/2 IF-Box X 3-1/2 IF-Pin 3' 4.75" Bowen Lubricated Bumper Jar 3-1/2 IF-Box X 3-1/2 IF-Pin 15' 4.75" 6 DRILL COLLARS 3-1/2 IF-Box X 3-1/2 IF-Pin 180' 4.75" 30 JTS—HWDP 4-1/2 CDS40 Box X 4-1/2 CDS40-Pin 900' 4.75" Page 14 Revision 0 May, 2017 • • 14GP 22-13RD3 Drilling Procedure Rev 0 Ilikorp;tIasku,I,1.1: 13.0 Whipstock Setting Procedure 13.1 With the bottom of the Whipstock 30—45' above the CIBP, measure and record P/U and S/O weights. We will orient Whipstock face using highside MWD. 13.2 Orient Whipstock to desired direction by turning DP in '/4 round increments. P/U and S/O on DP to work all torque out(Being careful not to set BTA). Whipstock Orientation Diagram: 30 R HS 65 R HS VP' Desired orientation of the Whipstock face is 65 degrees right of high side. Hole Angle at window interval (8500' MD) is 54 deg. The wellbore trajectory is planned to kick off at 93 degrees azimuth. 13.3 Once Whipstock is in desired orientation, slack off and tag CIBP to set Bottom Trip Anchor. 13.4 Set down 12-15K on anchor to trip, P/U 5-7K maximum overpull to verify anchor is set. The window mill can then be sheared off by slacking off weight on the Whipstock shear bolt. (25k shear value). 13.5 P/U 5-10' above top of Whipstock. 13.6 Displace to 9.0 ppg 80/20 Enviromul MOBM. 13.7 Record P/U, S/O weights, and free rotation. Slack off to top of whipstock and with light weight and low torque. Mill window. Utilize 4 ditch magnets on the surface to catch metal cuttings. 13.8 Install catch trays in shaker underflow chute to helpcatch iron. Y 13.9 Keep iron in separate bbls. Record weight of iron recovered on ditch magnets. Page 15 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Hileorp Alaska,Lu: 13.10 Estimated metal cuttings volume from cutting window: 7" 29# N-80 Cuttings Weight Window Length Casing Weight Min (lbs) Avg(lbs) Max(lbs) 13 29.7# 80 110 140 13.11 Drill approx. 20' rat hole to accommodate the drilling assembly.Ream window as needed to assure there is little or no drag. After reaming, shut off pumps and rotary (if hole conditions allow) and pass through window checking for drag. 13.12 Circulate Bottoms Up until MW in=MW out. 13.13 Conduct FIT to 12.5 ppg EMW. • (12.5 —9.0) * 0.052 * 8154' tvd= 1484 psi 13.14 Kick Tolerance • (12.5-9.0) * (8154/10913) =2.6 Note: Offset field test data predicts frac gradients at the window to be between 12 ppg and 15 ppg. A 12.5 ppg FIT results in a 2.6 ppg kick tolerance while drilling the interval with a 9.0 ppg fluid density. 13.15 Slug pipe and POOH. Gauge Mills for wear. 13.16 Should a second run be required pick up the following BHA. Back Up Mills Connection Length O.D. WINDOW MILL 3 1/2 REG-P X MILL 0.98 6.63 NEW LOWER WATERMELON MILL 3 % IF-B X 3 1/2 REG-B 5.5 6.5 FLEX JOINT 3 % IF-B X 3 '/2 IF-P 6.5 4.75 UPPER WATERMELON MILL 3 '/2" IF-B X 3 %2" IF-P 5.83 6.63 FLOAT SUB 3 '/2" IF-B X 3 %" IF-P 3.00 4.75 XO sub and 30 jts-HWDP 4 '/" CDS40-B X 3 %2" IF-P 900' 5.25 CONNECTIONS ON TUBULARS ARE SUBJECT TO CHANGE. BHA'S SHOW SPECIFIC CONNECTIONS AS AN EXAMPLE ONLY! Page 16 Revision 0 May, 2017 • • intGP 22-13RD3 Drilling Procedure Rev 0 Ililcorp Alaska,LLC 14.0 Drill 6" Hole Section 14.1 P/U 6" directional drilling assy. 14.2 Ensure BHA Components have been inspected previously. 14.3 Drift & caliper all components before M/U. Visually verify no debris inside components that cannot be drifted. 14.4 Ensure TF offset is measured accurately and entered correctly into the MWD software. 14.5 Confirm that the bit is dressed with a TFA of 0.46 -0.56 sqin. Have DD run hydraulics models to ensure optimum TFA. We want to pump at 225-275gpm. 14.6 Motor AKO should be set at 1.5 deg. Must keep up with 6 deg/100 DLS in the build section of the wellbore. 14.7 Primary bit will be the Varel 6"VS516DX PDC bit. Ensure to have a back up bit available on location. COMPONENTDATA OD ID Gauge Weight Top Length Bit-Center Item i' .I.'ftbon Serial Number 41 (in) (in) (in) (Ibpf) Connection (ft) Blade (ft) 1 HDBS MM55 6"PDC 12401235 4.500 1.500 6.000 48.18 P 3-1/2"REG 0.76 2 4 314"SperryDrill Lobe 5/6-8.3 stg 475-997 4.750 2.794 44.57 B 3-1/2"IF 29/5 3 Float Sub 12340120 4.760 2.250 47.10 B 3-1/2"IF 2.99 4 43/4"DM Collar 11122422 4.740 2.610 47.00 B 3-1/2"IF 8.93 5 4 3/4"Slim Phase 4 Collar 90463290 4.750 1.250 48.20 8 3-1/2"IF 24.49 6 43/4"ALD Collar 175C 90463451 4.750 1.250 5.600 45.50 B 3-1/2"IF 14.27 70.56 Stabilizer -__ 5.600 _-- 70.56 7 4 314"CTN Collar 90463451 4.750 t250 50.50 B 3-1/2"IF 11.13 8 4 3/4"PWD 90463400 4.730 1.250 47.90 B 3-1/2"IF 9.19 9 4 3/4'TM Collar 11293597 4.700 2.812 46.10 B 3-1/2"IF 11.17 10 Flex Collar 11623700 4.850 2.313 48.65 B 3-112"IF 31.05 11 X-Over 31/2"IF Pin x CDS-40 Box Rig 5.250 2.688 54A4 B coDS-4S-4 1.40 12 13 its 4-1/2"HWDP CDS-40 4.500 2.813 36.86 399.86 13 X-Over CDS-40 Pin x HT-38 Box 4370 5.260 2.125 61.97 B 4"HT 38 1.09 14 Weatherford DAH Jar 1400-1015 4.750 2.250 46.84 B 4'HT 38 29.89 15 X-Over HT-38 Pin x CDS-40 Box 4363 5.260 2.000 63.35 B 4'S 1.04 coDS-4 16 13 its 4-1/2"HWDP CDS-40 4.500 2.813 41.00 399.39 Page 17 Revision 0 May, 2017 I III GP 22-13RD3 Drilling Procedure Rev 0 Ilio orh.‘ia.ha.IAA: = � Tool# T10742 ' Assembly: A09718;� VS516DX voyager ,,„ IADG Code: 5333 nr,RIF=, PRODUCT SPECIFICATIONS • lITL, Cutter Size: 16 mm t*41*.lo... Cutter Back Up: Carbide Shock Studs Total Cutter Count: 24 Face Cutter Count: 14 ,4111, 0 Connection: 3 1/2"API Regular .. Nozzle 1 Qty/Type: 5-Series 55 Nozzle 2 Qty/Type: - Junk Slot Area: 6.8in2(43.9cm2) • Gage Pad Length: 3"(76mm) Make Up Length: 7.1"(180.8mm) Shank Diameter: 4.88" (124mm) OPERATING PARAMETERS* Rotary Speed: For all rotary and motor applications Flowrate Min-Max: 150 -350GPM (0.57- 1.32m3/min) Max Weight On Bit: 14000Ibs(6228daN) Makeup Torque: 7000-9000Ft-Lbs. (9491 - 12202Nm) 'Operating parameters shown are typical for the bt type specific_. FoT recommendations s on your specific applicationcontact your Varel International representative. Voyager Series Bits -Voyager series bits utilize Varel's proprietary design, modeling. and programming software coupled with specialized manufacturing techniques to create the optimal drill bit for your fit-for-purpose applications. Engineered though Varel Simulator Suite for specific directional applications,Voyager bits incorporate the latest design features to maximize cuttings removal,enhance ROP potential, improve directional response,and create a more durable bit frame to aid in accomplishing your aggressive directional drilling objectives. Bit Features D -Drop in cutter in gage pad. X -Shock studs limit drill bit vibration and increase stability allowing smooth cutting action increasing cutter life and overall bit performance. S -Steel body technology allows for wide open face hydraulics and aggressive cutting structures providing faster penetrating bits than matrix designs. Page 18 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Hileorp Alaska,LLC 14.8 TIH to window. Shallow test MWD on trip in. 14.9 TIH through window, ensure Halliburton MWD service rep on rig floor during this operation. • Do not rotate string while bit is across face of Whipstock. 14.10 Drill 6"hole to 13169' MD using motor assembly. • Pump sweeps and maintain mud rheology to ensure effective hole cleaning. • Utilize Inlet experience to drill through coal seams efficiently. Coal seam log will be provided by Hilcorp Geo team, try to avoid sliding through coal seams. Work through coal seams once drilled. • Keep swab and surge pressures low when tripping. • See attached mud program for hole cleaning and LCM strategies. • Ensure solids control equipment functioning properly and utilized to keep LGS to a minimum without excessive dilution. • Adjust MW as necessary to maintain hole stability. • Ensure mud engineer set up to perform HTHP fluid loss. • Maintain API fluid loss <6. • Take MWD surveys every stand drilled. • Minimize backreaming when working tight hole 14.11 Hilcorp Geologists will follow mud log closely to determine exact TD. 14.12 At TD pump a sweep and a marker to be used as a fluid caliper to determine annulus volume for cement calculations. CBU, and pull a wiper trip back to the window. 14.13 TOH with drilling assembly, handle BHA as appropriate. Page 19 Revision 0 May,2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Hilcorp Alaska,LLC 15.0 Run 5" Production Liner 15.1 R/U Weatherford 5" casing running equipment. • Ensure 5" SLIJ-II x 4-1/2" CDS-40 crossover on rig floor and M/U to FOSV. • R/U fill up line to fill casing while running. • Ensure all casing has been drifted and tally verified prior to running. • Be sure to count the total # of joints before running. • Keep hole covered while R/U casing tools. • Record OD's, ID's, lengths, S/N's of all components w/vendor&model info. 15.2 P/U shoe joint, visually verify no debris inside joint. 15.3 Continue M/U &thread locking shoe track assy consisting of: • (1) Shoe joint w/ shoe bucked on&threadlocked(coupling also thread locked). • (1) Baker locked joint. • (1) Joint with float collar bucked on pin end &threadlocked (coupling also thread locked). • (1) Joint with landing collar bucked up. • No centralizers • Ensure proper operation of float shoe& FC. 15.4 Continue running 5"production liner • Fill casing while running using fill up line on rig floor. • Use "API Modified"thread compound. Dope pin end only w/paint brush. • Utilize a collar clamp until weight is sufficient to keep slips set properly. 5" SLIJ-II M/U torques Casing OD Minimum Maximum Yield Torque 5" 6,400 ft-lbs 7,800 ft-lbs Page 20 Revision 0 May,2017 III • HGP 22-13RD3 Drilling Procedure Rev 0 Ililcorp Alaska,1.1.1 Issued on:30 May.2017 t 0 f Connection Data Sheet OD Weight Wall Th. Grade API Drift Connection 5 in. 23.20 lb/ft 0.478 in. L80 3.919 in. VAM®SLIJ-II PIPE PROPERTIES CONNECTION PROPERTIES Nctmnal OD 5.000 in. Connection Type Premium integral semi-flush Nominal ID 4.044 in. Connection OD(nom) 5.190 in. Nominal Cross Section Area 6.791 sgin. Connection ID(nom) 3.984 in. Grade Type API 5CT Make-up Loss 5.155 in. Mm Yield Strength 80 ksi Critical Cross Section 5.242 sgin. t<' a Max.Yield Strength 95 ksi Tension Efficiency 772 e.6 of pipe Mm Ultimate Tensile Strength 95 ksi Compression Efficiency 77.2%of pipe Internal Pressure Efficiency 100°k of pipe External Pressure Efficiency 100%of pipe CONNECTION PERFORMANCES FIELD TORQUE VALUES Tensile Yield Strength 419 klb Min.Make-up torque 6400 ft.lb Compression Resistance 419 klb Opti.Make-up torque 7100 ft lb Internal Yield Pressure 13380 psi Max.Make-up torque 7800 ft.lb External Pressure Resistance 13830 psi Max,Bending Capacity 48°/100 ft Max Bending with Sealablllty 20'/100 ft VW IIW.II VARA®SLIJ-1I is a semi-flush integral premium connection for . all casing applications.It combines a near flush design with ( tooxwit cookooyi high performances in tension, compression and gas r sealability. S co, VAMS SLIJ-II has been validated according to the most stringent tests protocols.and has an excellent performance d 10' r ,/ crs ; history in the world's most prolific HPHT wells. 40 FF 1111r4:41 11111 _ -e40.°1 1 f00n44.0+001ec31 400 400 -70 0 le 100 110 Licit Lemi r4 PIM 1 Cvi•fae etril le tri aev$ Do you need help on this product?-Remember no one knows VAMC like YAM canada@ eambeldservice.com uk@vamfeldsemce corn chna@varnbeldserwce.corn usa@vamfeldseroce.corn dubai@vamfieldse.rmecorn bake eamfiehiservice.con me..ico@vamfre/dservice.can ng ena@vamfie/dserece.corn srrgapoeevamf,e/dsemce con bravi@vamfeidsenace.mn angola@vanf/eldservrce corn austatia@vamfieldsemce.com Over 140 VAM®Specialists available worldwide 24/7 for Rig Site Assistance Other Connection Data Sheets are available at vAvw.vamservices.com No vallourec Valiourec Group Page 21 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Hileorp Alaska,LLC 15.7 Ensure to run enough liner to provide for approx 3,600' overlap inside 9-5/8" casing. Ensure hanger/pkr will not be set in a 9-5/8" connection. 15.8 Before picking up Baker SDD liner hanger/packer assy, count the# of joints on the pipe deck to make sure it coincides with the pipe tally. 15.9 M/U Baker SDD liner top packer. Fill liner tieback sleeve with"Pal mix", ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 min for mixture to set up. 15.10 RIH one stand and circulate a minimum of one liner volume. Note weight of liner. 15.11 RIH w/liner on DP no faster than 1 min/stand. Watch displacement carefully and avoid surging the hole. Slow down running speed if necessary. 15.12 M/U top drive and fill pipe while lowering string every 10 stands. 15.13 Set slowly in and pull slowly out of slips. 15.14 Circulate 1-1/2 drill pipe and liner volume at 7"window prior to going into open hole. Stage pumps up slowly and monitor for losses. Do not exceed 60% of the nominal liner hanger setting pressure. 15.15 Obtain up and down weights of the liner before entering open hole. Record rotating torque at 10, 20, & 30 rpm. 15.16 Continue to fill the string every 10 joints while running liner in open hole. Do not stop to fill casing. 15.17 P/U the cmt stand and tag bottom with the liner shoe. P/U 2' off bottom. Note slack-off and pick-up weights. Record rotating torque values at 10, 20, & 30 rpm. 15.18 Stage pump rates up slowly to circulating rate without exceeding 60% of the liner hanger setting pressure. Circ and condition mud with the liner on bottom. Reduce the low end rheology of the drilling fluid by adding water and thinners. 15.19 Reciprocate &rotate string if hole conditions allow. Circ until hole and mud is in good condition for cementing. Page 22 Revision 0 May, 2017 • GP 22-13RD3 Drilling Procedure Rev 0 Ililcor1,11aska,l.0 16.0 Cement 5" Production Liner • Cement will be mixed using batch mixer to ensure consistent density 16.1 Hold a pre job safety meeting over the upcoming cmt operations. 16.2 Attempt to reciprocate the casing during cmt operations until hole gets sticky. 16.3 Pump 15 bbls 12.5 ppg spacer. 16.4 Test surface cmt lines to 4500 psi. 16.5 Mix and pump 75 bbls of 15.3 ppg class "G" cmt per below recipe with 0.5 lb/bbl loss circulation fiber. Ensure cmt is pumped at designed weight. Job is designed to pump 50% OH excess but if fluid caliper dictates otherwise we may increase excess volumes. Cement volume is designed to bring cement up to 7" casing and 8-1/2" open hole. Est TOC 8500' TMD. 16.6 Displacement fluid will be drilling mud. —341 bbls of displacement fluid Cement Calculations 6"OH x 5"Liner: (13169' —8500')x 0.01069 x 1.5 = 75 bbls Shoe Track: 120' x 0.01589 = 2 bbls Total Volume(bbls): 75 +2 = 77 bbls Total Volume(ft3): 75 bbls x 5.615 ft3/bbl= 421 ft3 Total Volume(sx): 421 ft3 / 1.34 ft3/sk= 314 sx Page 23 Revision 0 May,2017 11111 GP 22-13RD3 Drilling Procedure Rev 0 IIilcorp Alaska,1.1A: Slurry Information: System Easy BLOK Density 15.3 lb/gal Yield 1.34 ft3/sk Mixed Water 5.879 gal/sk Mixed Fluid 5.879 gal/sk Expected Thickening 70 Bc at 05:00 hr:mn API Fluid Loss <25 mL in 30.0 min at 155degF/ 1000 psi Code Description Concentration G Cement 94 lb/sk D046 Anti Foam 0.2%BWOC Additives D202 Dispersant 1.5%BWOC D400 Gas Control Agent 0.8% BWOC D154 Extender 8.0%BWOC 16.7 Drop DP dart and displace with drilling mud. 16.8 Pump cement at max rate of 8 bbl/min. Reduce pump rate to 3 bpm prior to latching DP dart into liner wiper plug. Note plug departure from liner hanger running tool and resume pumping at full displacement rate. Displacement volume can be re-zeroed at this point 16.9 If elevated displacement pressures are encountered,position liner at setting depth and cease reciprocation. Monitor returns &pressure closely while circulating. Notify Drilling Foreman immediately of any changes. Reduce pump rate as required to avoid packoff. 16.10 Bump the plug and pressure up to up as required by Baker procedure to set the liner hanger (15% above nominal setting pressure. Hold pressure for 3-5 minutes. 16.11 Slack off total liner weight plus 30k to confirm hanger is set. 16.12 Do not overdisplace by more than 1/2 shoe track(-1 bbls). Shoe track volume is 2 bbls. 16.13 Pressure up to 4200 psi to release the running tool (HRD-E) from the liner Page 24 Revision 0 May, 2017 I GP 22-13RD3 Drilling Procedure Rev 0 Hi!carp Alaska,1,1.t: 16.14 Bleed pressure to zero to check float equipment. 16.15 P/U, verify setting tool is released, and expose setting dogs on top of tieback sleeve 16.16 Rotate slowly and slack off 50k downhole to set ZXP. 16.17 Pressure up drill pipe to 500 psi and pick up to remove the RS packoff bushing from the RS profile. Bump up pressure as req'd to maintain 500 psi DP pressure while moving pipe until the pressure drops rapidly, indicating pack-off is above the sealing area (ensure that 500 psi will be enough to overcome hydrostatic differential at liner top). 16.18 Immediately with the loss of pressure and before DP reaches zero, initiate circulation while picking up to position the bottom of the stinger inside the tieback sleeve. Increase pump rate to wellbore clean up rate until the sleeve area is thoroughly cleaned. 16.19 Pick up to the high-rate circulation point above the tieback extension, mark the pipe for reciprocation, do not re-tag the liner top, and circulate the well clean. 16.20 Watch for cement returns and record the estimated volume. Rotate & circulate to clear cmt from DP. 16.21 POOH, LDDP. Verify the liner top packer received the required setting force by inspecting the rotating dog sub. Backup release from liner hanger: 16.22 If the HRD-E tool still does not release hydraulically, left-hand (counterclockwise)torque will have to be applied to the tool. This torque acts to shear brass screws. Bleed off pump pressure and ensure that the tool is in the neutral position. Apply left-hand torque as required to shear screws. 16.23 NOTE: Some hole conditions may require movement of the drillpipe to "work"the torque down to the setting tool. 16.24 After screws have sheared, the top sub and body of the setting tool will turn 1/4 turn. Then proceed slacking off set-down weight to shear second set of shear screws. The top sub will drop 1-3/4 inches. At this point,the bottom sub no longer supports the collet fingers. Pick straight up with workstring to release collet from the profile. Page 25 Revision 0 May,2017 S GP 22-13RD3 Drilling Procedure Rev 0 Ilileorp Alaska,1.1.0 Ensure to report the following on Wellez: • Pre flush type,volume(bbls)&weight(ppg) • Cement slurry type, lead or tail,volume&weight • Pump rate while mixing,bpm,note any shutdown during mixing operations with a duration • Pump rate while displacing,note whether displacement by pump truck or mud pumps,weight&type of displacing fluid • Note if casing is reciprocated or rotated during the job • Calculated volume of displacement, actual displacement volume,whether plug bumped&bump pressure, do floats hold • Percent mud returns during job, if intermittent note timing during pumping of job.Final circulating pressure • Note if pre flush or cement returns at surface&volume • Note time cement in place • Note calculated top of cement • Add any comments which would describe the success or problems during the cement job Note: Send Csg& cmt report+ "As-Run"liner tally to mmyers(a�hilcorp.com Page 26 Revision 0 May,2017 • ! GP 22-13RD3 Drilling Procedure Rev 0 Ilileorp Alaska,I,1.1: 17.0 Wellbore Clean Up & Displacement 17.1 M/U casing clean out assy complete with casing scraper assys for each size casing in the hole. • 3-1/2" bit or mill • Casing scraper&brush for 5"23.2# casing • +/- 8149' 2-3/8"workstring. • Casing scraper& brush for 7"29# casing • (2000') 4-1/2" DP • Casing scraper&brush for 7" 29# casing • 4-1/2"DP to surface. 17.2 TIH & clean out well to landing collar(+/- 13,049' MD). • Circulate as needed on trip in if string begins to take weight. • Circulate hi-vis sweeps as necessary to carry debris out of wellbore. • Ensure 3.5"bit is worked down to the landing collar. • Space out the cleanout BHA so that the 3.5"bit reaches the 5" landing collar when crossover is +/- 30' above the 7" liner top. ZOOV 17.3 After wellbore has been cleaned out satisfactorily using mud, test casing to)..501psi/30 min. Ensure to chart record casing test. 'Mg rt 17.4 Displace drilling fluid in wellbore with a hi-vis pill followed by filtered inlet water. • Circulate 3 to 4 B/U until clean-up is satisfactory. Do not recirculate fluid, pump and dump • After a couple circulations using FIW, short trip the assy to bring the upper 7" scraper assy to surface. • RIH again&tag landing collar w/3.5"bit. Continue circulation as necessary until fluid cleans up. Make another short trip if necessary. • Pump a chemical train followed by FIW. Target NTU's are 80-100 17.5 TOH w/clean out assy. LDDP on the trip out. Page 27 Revision 0 May,2017 • GP 22-13RD3 Drilling Procedure Rev 0 ttilcorp Alaska,tIC 18.0 Run Completion Assembly 18.1 Run 2-7/8" X 2-3/8"tubing completion assembly as per separate Approved Completion Sundry 19.0 RD 19.1 Install BPV in wellhead. RILDs. 19.2 ND BOPE,NU tree, test void 19.3 Rig Down Page 28 Revision 0 May,2017 • GP 22-13RD3 Drilling Procedure Rev 0 Hilcorp:1la4a.LI.I. 20.0 BOP Schematic R.g Floor 16" Pipe III!IIIIIIIIIIIiiI //I el ff11(ftl (f1)[Wirt 3.7,1 Shaffer 13 5/8 SM 111 his ill Iii lil Shaffer SI _._..---!�• — 27/8-5.5Variables 2.83 13 S/8 SM Blind a 2 1l16 5M marnual and HCR valve ',M manual valves 1J 1!1111111111 111 07.40 1.76 ;IE'I;•(-- � 1 ' ' ' '...HOU II • a`� a`/ • lii it. .111 III ' I , 1 Shaffer SL 11100:3 13 5 8 SM 2 7/8.5.5 Variables 41' I11 Il11!1 III III - ----�_-- Drill deck 13.70' Riser 1111 135/8 SM FE 13 5/8 5M API hub 1113 p p 0 0 Page 29 Revision 0 May,2017 40 • HGP 22-13RD3 Drilling Procedure Rev 0 Iih orp la-ka.I.1.1. 21.0 Wellhead Schematic Granite Pant GPP 22-13802 Tubing hanger,PMC•UH- 18 X 13 3/8 X 9 5/8 X TC-IA-EN,13 5/8 5M X 3)5 31/2 IIT lift and 3Kl8Tsusp,w/ 3'•type IS BPV,6,990"EN BHTA,OCT-8.11-AO, 3 1/16 10 A FE T Valve,Swab,FIP, �.t T.- 31/1610M FE.HWO. 88 tern 40 A•% Ir• Valve,Wing,FIP, �t 31/16 10M FE,HWO. �Si 88 tern alr 1 Valve,Matter,PIP, OV.k. � 3 1/16 10M FE,HWO, BB trim !� Valve,Master,WKM•M1, *••► 31/1610M FE,HWO, I ~7� , t 88 tern ;;!�! ,. Adapter,IMC-Ml',13 5/8 SM API Clamp X 3 1/16 IOM,w/ 6990"extended neck pocket Unihead,OCT type 2.13 5/8 SM API /. hub top X 13 3/8 BTC casing bottom, Nllh w/2.2"LPO on laver section,2.2 1/16 5M 550 on upper section,IP internal lockpin assy 1 Valve,OCT•20,2 1/16 SM p . •T • • — li ?HWO,AA trim I �II- .w� II• I. 1111 III" J.4 IX Starting head.OCT, *_. i_!/• .iii i" 21 1/4 2M Hub x 2414 1M - Ii , Valve,OCT-20,2"LPO,HWO, Hub w/2.2"LPO,prepped f/ I 4,/ ► AA trim 18"EN hanger a_, ��ell IP,,v., 'ora M I. MIL-r.--44...w liMill,Aill Conductor housing, 24 X 1M Hub: airl 1.124"Buttweld I' '' MN I11I- 11 1/F' I9 V8" i Page 30 Revision 0 May, 2017 • GP 22-13RD3 Drilling Procedure Rev 0 llilcorp Alaska,LLC 22.0 Days vs Depth Days Vs Depth 0 GP-22-13RD3 2000 4000 6000 v U, N l0 8000 10000 12000 14000 — 0 5 10 15 20 25 30 35 40 45 Days Page 31 Revision 0 May, 2017 I • i HGP 22-13RD3 Drilling Procedure Rev 0 Ililcorp Alaeka,1,1.1. 23.0 Geo-Prog GEOLOGICAL PROGNOSIS WELL NAME: ;GP 22-13RD3 'FIELD: Granite Point GP 22-13RD3 SURFACE-X. _X=263405.54 STATE: Alaska SURFACE Y: Y=2544551.71 BOTTOM HOLE X: X=267349.10 TVD REF DATUM,d KB BOTTOM HOLE Y.' i Y=2542527.90 TVD REF ELEV 115 COORD REF SYSTEM INAD27 AK4 True North f GROUND ELEV 0.0 PROPOSED TD: 13169 MD WATER DEPTH 75.0 PROPOSED TD: 10913 TVD Sidetrack well 22-13RD2 and drill a-2000'lateral through the Tynonek C7 SAND Objective: Geo Summary/ 07 lateral well through untapped oil wedge on eastflank of field. Justification: GP 22-13RD3 zFLUID_ "is_ -,aP. KOP 8500 8,154 -8029 3533 3533 8.3 0.43 C2 Tyonek I Oil/Water I 9707 I 9095 -8980 1592 I 4630 9.8 0.51 CS Tyonek Oil/Water 10201 9512 -9400 1930 4794 9.7 0.50 C6 I Tyonek I Oil/Water I 10467 9737 I -9630 2230 I 4884 I 9.6 I 0.50 C7 Tyonek Oil/Water 10975 10,119 -10000 2146 5028 9.6 0.50 TD Tyonek Oil/Water 13169 10,913' -10750 2450 5332 9.4 0.49 Primary Objective =Secondary Objective TARGET SIZE 50 FT _ _ t DATA COLLECTION REQUIREMENTS: Mud Logging: gas monitoring and cuttings description M/LWD Data MWD/GR,resistivity,neu,den,dipole sonic E-Line Log Data: RFT,SVMC COMPLETION TYPE 2-7/8"x2-3/8"GLM Completion ANTICIPATED RATES ARTIFICIAL LIFT EQUIPMENT OD Run Tubing and Gas lift Valves TUBING SIZE OTHER COMMENTS Page 32 Revision 0 May,2017 GP 22-13RD3 Drilling Procedure Rev 0 lrilcorp Alaska,uA: 24.0 Anticipated Drilling Hazards Lost Circulation: Ensure 500 lbs of medium/coarse fibrous material, 500 lbs SteelSeal (Angular, dual-composition carbon-based material), & 500 lbs different sizes of Calcium Carbonate are available on location to mix LCM pills at moderate product concentrations. Hole Cleaning: Maintain rheology w/viscofier as necessary. Sweep hole w/20 bbls flowzan as necessary. Optimize solids control equipment to maintain density and minimize sand content. Maintain programmed mud specs. Coal Drilling: The following lessons were learned from extensive experience drilling coal seams in Cook Inlet. The need for good planning and drilling practices is also emphasized as a key component for success. • Keep the drill pipe in tension to prevent a whipping effect which can disturb coal sections. • Use asphalt-type additives to further stabilize coal seams. • Increase fluid density as required to control running coals. • Emphasize good hole cleaning through hydraulics, ROP and system rheology. • Minimize swab and surge pressures • Minimize back reaming through coals when possible H2S: H2S is not present in this hole section. No abnormal temperatures or pressures are present in this hole section. Page 33 Revision 0 May,2017 140 • GP 22-13RD3 Drilling Procedure Rev 0 Hilcorp Alaska,LLC 25.0 Rig Layout /.'VT' . ,,,.ir . ii.,.„,x, . , i ,,,, .-,:„ W.• -,gfir- '4 - .6,7,ryir.TxT,:y I r-�� Y CI .TV . '4 a%. .it[C�,r"J-T : .T,;,,- . xt. :(1).-c,x-1:004.0-- kip.0 aa- GJARTEtB +% xt 1 1 r ..( ( .I T 1 i I 1 it // r. i 11 111 , I j .J e` II ii r \\�� —�` , �� / \ . .. \,':\\\\\ \ \.s ' r7 , ---------..„_ _____...„----- r,/,::.,,,,,,-„, 1i --.-1 ,r-a' 4-- r Page 34 Revision 0 May, 2017 4110 1111 GP 22-13RD3 Drilling Procedure Rev 0 Ilikwrp Alaska,IJA 26.0 FIT Procedure Formation Integrity Test (FIT) and Leak-Off Test (LOT) Procedures Procedure for FIT: 1. Drill 20' of new formation below the casing shoe (this does not include rat hole below the shoe). 2. Circulate the hole to establish a uniform mud density throughout the system. P/U into the shoe. 3. Close the blowout preventer(ram or annular). 4. Pump down the drill stem at 1/4 to 1/2 bpm. 5. On a graph with the recent casing test already shown, plot the fluid pumped (volume or strokes) vs. drill pipe pressure until appropriate surface pressure is achieved for FIT at shoe. 6. Shut down at required surface pressure.Hold for a minimum 10 minutes or until the pressure stabilizes. Record time vs. pressure in 1-minute intervals. 7. Bleed the pressure off and record the fluid volume recovered. The pre-determined surface pressure for each formation integrity test is based on achieving an EMW at least 1.0 ppg higher than the estimated reservoir pressure, and allowing for an appropriate amount of kick tolerance in case well control measures are required. Where required, the LOT is performed in the same fashion as the formation integrity test. Instead of stopping at a pre-determined point, surface pressure is increased until the formation begins to take fluid; at this point the pressure will continue to rise, but at a slower rate. The system is shut in and pressure monitored as with an FIT. Page 35 Revision 0 May, 2017 Y� 14 • GP 22-13RD3 Drilling Procedure Rev 0 lid,orp:kla.ka.Iii. 27.0 Choke Manifold Schematic Choke Manifold Valves 2" To Shaker 3" Panic To Gasbuster 3 1/8" 21/16" 1 © © 2 1/16" 1111_p......._p-_'NI 21116" 21/16" + + p zo �� 31//88"" I I `/-- p p p " Le 0A1110111111111110J f 1 1 2 1/16" p 2 1/16" Manual Choke Automatic Choke 2 1/16" Inlet Pressure Sensor 3"5,000 PSI Choke Manifold Kuukpik Drilling Rig 5 RED = 3 1/18" 5,000 PSI VALVES AND LINES BLUE=2 1/16"5,000 PSI VALVES Kuukpik Drilling Rig 5 Choke Manifold C-2 r 0 tf, , \\. is Q 4'16 x5 ' U .s3. 15 Mlv . Illk Kuukp.k Dnnhng Rig 5 Page 36 Revision 0 May,2017 • H • GP 22-13RD3 Drilling Procedure Rev 0 IIil orp Ala:ka,1.1.1: 28.0 Fluid Flow Diagrams T R e 77 F A kU Es W 11 I I 1 1 1 1 I ¢.. r i.2 IJi0.i,,o,miuir■ N 1 i 1 1 I 1 1 1 i n 7: i%jai'Ip i%Ip laiPlpiP 1/11/1111111 1 I I��IUI I��IU I� 1/1 i/11f 1 1�1 1 i ivoolviv �i;iri~ 1E11�1,It•}• i(11[II[Ilnir Iq!;'•!;1q!VI 1A Ir 11 nn lia i l i !I.:"l l l DQ X a0i r1p O y c 'A S WQ • O' Fos rpp .J j WD N(1 •O E A fla o Z 1 I I I ,p ij 19.1-4110.1.114.P I"+I�10I.•p COL 0. • V I 1 1 I 1 1 1 I i i♦� DI f>,1 {>I 1 re.lu 1".1.'Ir.IV I"+I"4IN CO CD • 1.1i;i itlie'i.ii O 1,i[')IgO1}r�I i I 1 1 I! ? n 1'A it IV la igig i3igigiS. a) , IA"i M b)r 9 ii i .-r '1.1�i11�l�lr i)lEi iND O 1 !g iw 1;i;t.fs IA In i 0.€1 f 1..-1.`"!r)'"'"'"`"14.)' nSn( In•n(nSn("1•.)1nZ ��]ttt Ir Ig Irlglrlrtglgtrl �� a!a!a!a!a!a+a!a+a iI . 4 Tril •g N Aroo a A I4t1i:iy itiiltti:3i;1Np i i i i i i i N N N W A 1 I. 1 IC1 1 it ` 1 1 i ,c IMI 1" 1 1.11r, IS ISI if . I IF I�I'51 1� i 1 1 1 it—ie 1 1� I{rp ll:lr^ Ii�I�Iw�I .�7ti k ig iod �$.7i-1�X5i�1$• C O ! 7I I iEi 1w 77 K 1, C T -17 I til` r-i1 1i. N G -0Q Q 17 1 1— 1.1 ,1 1C N O i 1'iT i:!1r'1 i. C- -1-is il,:ia;° U (J, -S Page 37 Revision 0 May, 2017 • GP 22-13RD3 HDrilling Procedure Rev 0 itileorp Alaska,LLC X C C n v r T. Y • V E W I I t I I I 1 t 1 m d ia°itej,.rjp,jw j♦it.ieaj.. II 7 X I I I i I I 1 i I F C) lea lralra Ira lealeaira iea lra 1,11,;11,111;11;11,1^,1,111;..-,1;;;; r✓ iP id'i0'ip iP is jli M iO' .44 Lgisiiiiiiiiis 5. h:, i90. 0N0. 0. 13 i� 4 IC., ) ill iii� c,i�j�, I. 4 I4.4 i4. .4 f4.4 t4 I i t it tilt 1 i;io i0 O�t��SO,, OOjOiO _ _ p i iii i i i i i • D4 DQ 0 F Z oWg °� N g 4 Y 7c to ' " CD co X y Y �7 J p e W� Nx .- II j i j j i i i i s Op Cr' 1031-alalwta.141eair..l01 coA Q X n 11 1 1 t 1 1 1 i I, I jvjairairajuWeirairai D4 D4 D4 D4 i.-. i iCjtiIiii i — N co (D C Cn I? IQI le6Q 1��b�ppfrrres 1 1 1 t t�fj. Il*r I11Q ta_ i9 inial. , 4--- IFi.lt.It Ia mi—IK 9 i iCD 0 I4 IY la in i0ii ii!0iC?I N� I 1; i".<it i,j IR 17 i�iA i 0 -r1c. S '-s !A InfAin.`n.rnra`rytnM f "» Spa,IF ip p IF IIp IF tp ,- • ...• i$11111111.. $ CO 55 Is , vl ,.... to imiti to. 1:›1 z r 1 N I n w N 1 1 t vI I t r I.aIr 4a leaIraIr.I.. a iwiai4 Iraii ; r.-.G.O 'L. (%) NN W A . ...5 i DQ 1>a I 1 i 101.-.1 1,,, i 1 in i: Isi is a. I i i* is i7 I iv 1 t. i- 1v 1 l v c 1 0 1�ii4. .4 l•Y 1 tY v N 1O�15 Sl.t�TiSin S. (5 l y 1 7 4 1!:+:!'14 4 I l=4 I ii 1^, • C a • • • • a (O] _ IS IC !,1!,s•, I Is V) �5 i• 11 1.11.;:! 1"..! 1 i 4;071 14 T1 1 1 14 14 I IN O .0!,-)!O I 1 i�f G 1 1• lat° I. 1° lin : _ (r:.; ra Page 38 Revision 0 May, 2017 • • 14GP 22-13RD3 Drilling Procedure Rev 0 IIib orp Alaska.1.1 A'. X n v 0 m 6 Ou O s (J _) _ 1 1 1 1 I 1 1 ( I '/, 1•p'co!A!a!v.!♦!sr!N1.- W fn. 1 i 1 1 I 1 i 1 I _= i f 1 1 t t n ilair'i"i"i/11i/ om4i"'i1'i1.1 t . 1111117,11;11;1;11111;111Z;1;.-1;••• 4t •P P P P P•P P P P •�I 44 ''.../11 +111 11 11111111 111 !iii!Sii!iiiiiii!i S I 1 1&1 1 1 1 1 1 v1717ovMOc110lig riVEIVn1VLi4;iA+A+AI*Iq IA to IA•y 1 1 i t i i ', i 1S4io-x1010 !�10 .........÷..__ I1$41.4 14 11 1 4 . — -a Iarai•1° ir Ia,°iw r° C.71 V DQ 0 D4 C C.71N r °� wgc Y Y m N 6 cal a) Ng A go E - fla o 1 1 1 1 1 1 1 1 1 1V Ei o IplZla 1y11i.1Llr1,,.Cio1i co L.l V _ I i i i 1 1 + 1 1 1ir,' 11 1 I 1 1 7 7 1 1 , I1 1 1..IrI 1 1..I,,,I •Ir i.:Iidlalaftarvv O 7.ill I 1 1 t 1 I$I 2 IsiFiq i9�t„t•,!". iiOi x- C) I+1 .1=1=1�.1-n1-191 i - .- !,:-!,..-,,!=,..:-..-!-,..4-,,, I I=Ir IE Ilii tr iviv 1 8x -rt •G. i IA t'*Iw I;Im im I;Ir.1 1" i 1. i i i l it i t 1 'Q A•A•A• -n R n•n _ C }7!S!S!S, IS!S!S!S v - le+p(,may I*I.:j Iq lil Co,f, [C: i + r l l I t l 1 l l I t 4 Na ® N c GJ1 zolo i% zA I I I 'I I 1" fit.¢ Qp Iw!i:!v !i:!1'!0!0 ■ N p N N t l 1 I ver I W A I 1 i *i i I I 1 C i l l t I l I- g PI *1 i I I 12 I i i i'!! A fA ET I 1 IC ISIsI Im R. I 1 1r i .i Iw - _ I I N i" I-l e i is T I 1 I1 •tlY tr_i_1/= t - iQ11616 $.i-i Isle K m Z"1 .�rro i •i=i,-f•+1•�iF •• - c _C !-1!... ir^I}..1 Irm.• N Q. o Q.. i I�I. I1 loom 1 Iii , �. .m Ti 1 imi9 i!3rt �I rErI I 17i4 i I . 1 I 1 Im I 1 Im t soQ I..z0.i S 1.3-111 k0 IIa 1'g o:1� r. i I I iii O 1 I I I f Page 39 Revision 0 May, 2017 • GP 22-13RD3 Drilling Procedure Rev 0 Ililcorp Alaska,IIA 29.0 Casing Design Information Calculation & Casing Design Factors Cook Inlet Offshore DATE: 6/5/2017 WELL: GP 22-13RD3 FIELD: McArthur River DESIGN BY: Monty M Myers Design Criteria: Hole Size Mud Density: Hole Size 6" 11011111111 Mud Density: 9.0 ppg Hole Size Mud Density: Drilling Mode -______ MASP: 2837 psi (See attached MASP determination&calculation) Production Mode MASP: 5347 psi (See attached MASP determination&calculation) Collapse Calculation: Section Calculation 1, 2 Normal gradient external stress (0.43 psi/ft) and the casing evacuated for the internal stress � I Casing Section Calculation/Specification 1 2 3 4 Casing OD 5" Top(MD) 4,900 Top(TVD) 4,884 Bottom (MD) 13,169 Bottom (TVD) 10,913 Length 8,269 Weight (ppf) 23.2 • Grade L-80 Connection SLIJ-Il Weight w/o Bouyancy Factor(lbs) , 191,841 Tension at Top of Section (lbs) 191,841 Min strength Tension (1000 lbs) 419 Worst Case Safety Factor(Tension) : 2.18 Collapse Pressure at bottom (Psi) 4,693 Collapse Resistance w/o tension (Psi) 13,830 Worst Case Safety Factor(Collapse) 2.95 MASP (psi) 2,473 Minimum Yield (psi) 13,380 Worst case safety factor(Burst) 5.41 Page 40 Revision 0 May,2017 GP 22-13RD3 Drilling Procedure Rev Q Ililcorp Alaska,LLI: 30.0 6" Hole Section MASP Maximum Anticipated Surface Pressure Calculation 6"Hole Section Hilcorp GP 22-13RD3 Cook Inlet,Alaska MD ND Planned Top: 8500 8154 Planned TD: 13169 10913 Anticipated Formations and Pressures: Formation ND Est Pressure Oil/Gas/Wet PPG Grad KOP 8154 3533 COAL 8.3 0.43 C2 9095 4630 COAL 9.8 0.51 C5 9512 4794 Sand/Conglomerate 9.7 0.50 C6 9737 4884 Sand/Conglomerate 9.6 0.50 C7 10119 5028 Sand/Conglomerate 9.6 0.50 TD 10913 5347 Sand/Conglomerate 9.4 0.49 Offset Well Mud Densities Well MW range Top(ND) Bottom(ND) Date A-27RD2 9.3-9.5 7,755 9,718 2016 K-24RD3 8.9-9.3 8,768 9,994 2017 A-27RD 9.5-9.7 6,328 9,950 1997 K-06RD2 9.0-9.3 6,352 9,792 2017 Assumptions: 1. Anticipated fracture gradient at 8500'TMD(8154'ND)=0.7=14.9 ppg EMW 2. Maximum planned mud density for the 8-1/2"hole section is 9.5 ppg. 3. Calculations assumes 9.2 ppg reservoir contains 2/3 gas,1/3 water. Fracture Pressure at window considering a full column of gas from window to surface: 8154(ft)x 0.7(psi/ft)= 5708 5708(psi)-[0.1(psi/ft)*8154(ft)]= 4893 psi MASP from pore pressure;normal gradient at TD,(0.49 psi/ft) 10913(ft)x 0.49(psi/ft)= 5347 psi 5347(psi)-(0.1(psi/ft)*10913(ft))= 4256 psi MASP from pore pressure;unknown gas sand at TD,at 9.4 ppg(0.49 psi/ft) 10913(ft)x 0.49(psi/ft)= 5347 psi Downhole 5347(psi)-[(2/3)*0.1(psi/ft)*10913(ft)]+[(1/3)*0.49(psi/ft)*10913(ft)]= 2837 psi Drilling MASP Summary: 1. MASP while drilling 6"hole is governed by pore pressure minus 12/3 of wellbore evacuated to gas(remaining 1/3 remains 9.4 ppg drilling fluid) Page 41 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 itoorp.‘hi-kat HA: 31.0 Plot (NAD 27) (Governmental Sections) II ,. era-»aur / w/ f 7 i / , Legend ' - / ,' ABHL Plan GP 22-13RD3 SHL Other Surface Hole Location , /! / *AN-, n f Plan GP 22-13RD3_TPH • Other Bottom Hole Location I*,AN-c /HL --- well Paths r / S010N011W -I- Plan GP 22-13RD3_BHL a /r MtJC-I-01 BHL • Mt.1C-IA2 BHL / • / S010N012W t *3 \ 1 • \ irOC,-03 BHL , \ / \ 1 • \ \(,RANITE_P„7,1 IVGP-11-13 BHL .-31-13 BHL r/. ♦ ` \ 6 \ 1 r r ♦♦ 1 ,\SGP-11-13RD BHL ♦ •G 1-14R P.8Q2_BHL \• \ \ 1 r'♦,�"--—..a__, ,,GP-3\14RD1 BHL, \ t ♦•\ ♦ \ \ 1 \ \ \ 1 / ♦♦\ \\\\ I GP-22,16 BHL -- < 1 •, / O. Plan GP 22-13RD3 SHLI,\ s,r / o on .,,Pt >c,• —GP„32-13 BHL Plan GP 22- TPH __- '2W `,, GRANITE POINT UNIT ° S010N011W f r13, it`, +01t�N011;i�1 -rte rI 1 __ a / , I t t �♦ '-"6P33-13 BHL gal / /� / I I • r / /i J I I \ ♦♦ —� Qa '' / !g ' I I l ♦ P / / /; 1 1 \ ♦ o • /' // r I I 1 °O♦. /',/ // t I I \ °o`,, GP-4414- / I I 1 ° w / o ti s- _, / ' I t /' // �B/ / I t Plan(ip_22-I3RD3 BHL. o°° /r �/ / I I I Imo• / / / I I i . GP-32-13RDPB BHL / I f I I • // / 1 I I GP-24-13RD: c- 4-13 BHL / ' 1 1 l rt / // / / I i / / / 1 1 1 / / / / I i // / r / I / / / Iti / / / 1 t / / P I1-24 BHL r____) t / GP--�t-24PB BHL1 1 // +010N012W i S010N012W S010N011W / E 3 � &I 90 I /4 I r U I II 0 820 1640 Granite Point Unit Feet G P 22-13 RD3 Alaska State Plane Zone 4,NAD27 A Ililnrrp Alaeka.L1.0 Map Date:5/22/2017 Page 42 Revision 0 May, 2017 0 GP 22-13RD3 HDrilling Procedure Rev 0 Ililcorp Alaska,LUG 32.0 Slot Diagram (As Built) (NAD 27) t2 PROTRACTED SECTION LINE NOT TO SCALE(NTS) 14 11 1�- 1 SECTION CORNER ?I <-' (PROTRACTED) N.2546957.328 E:262081.754 i CENTER LEG 2 V) _, LAT:60°57'29.91087"N I— LON: 151°19'53.20585"W Z "9 N:2544611.886 w ) E:263360.744 -JASP ZONE 4 NAD 27 Q i 2319'FNL U CO 1326'FWL O i— :4. \ Na SW'S N J0S A 0'~'—'� 1326'ML(NM) ) ..l 08SER':ED Z CENTER LEG 1 In LAT:60'57'29.46354"N LON: 151°19'54.53958'W Z N:2544567.808 E:263293.981 J ASP ZONE 4 NAD 27 F O2364'FNL Evp*v A 1260'FWL 14., MGTY n LU V) 31 taRD2 �1J• 11 N �',236,0:4F.6303.:::2:3:107:0104.7„,"...404:10,: 2�""`("'�>'W..r � GRANITE(POINT PLATFORM CENTERLEG3 o J}}�aRD``n 712] 6P 51 2-iJRD2 EMPTY �'W�,;;;,� ASBUILT WELL LOCATIONS LAT:60°57'19.26234"N < �a ']" SECTION 13 T1 ON R12W J LON: 151'19'52.28688-W I— u-1a Ewry `��� N:2533545.320 11-13RD �.W�J1„ wa.1 E:263404.821 '~"�'CC 1371'mm NTS '� ASP ZONE 4 NAD 27 4. 5 FNL 11.34 ".."03371' FWL 32.1sRD a2-23RD Dp,S,p 24-13RD .613 513653 EMI, 11",1V ErdpivCENTER LEG 4 .....—A,____ ` �W 5' LAT:60'57'28.81798"N 1305'rm.(NTS) • vO—I+—ss LON: 151'19'53.62548"W EMPTY •�•�� N.2544501.349 • •.:, E:263337.774 sa ASP ZONE 4 NAD 27 2830'FNL +O Wit i�1 t , [nip-r Evp.v y, 1405'FNL NOTES s*: iii i` '.„c 00, 1. BASIS OF HORIZONTAL CONTROL:NAD83 US FEET POSITION(EPOCH / .', 2010)AND VERTICAL CONTROL(NAVD88)IS AN OPUS SOLUTION FROM �. • NGS STATIONS TBON.TSEA.AND ANC2 TO ESTABLISH POINT#1100 THE / (AIN C BROWN /1. ,.. ALASKA STATE PLANE COORDINATES NAD 83 ZONE 4 IN FEET ARE: //°$* N=2544351.693 1 ELEV. MINNIF 03394.958(NAVD88) ,*.313 ,4•\k..k .��++ t \\ 2.SECTION LINES SHOWN ARE EXTENSIONS OF PROTRACTED VALUES. SCALE 3. COORDINATE CONVERSIONS(NAD83-NAD27)WERE DONE USING c 30 cJ `CORPSCON SOFTWARE VERSION 6.0.1 1 I ' FEET ' f "--"' HILCORP ALASKA.LLC """"°" - ilDgNIF1116_ GRANITE POINT PLATFORM WELL SLOTS HNeV"Ke COOK INLET ALASKA AS BUILT SURFACE LOCATION ""` NAD 27(FOR INFORMATION ONLY) PROJECT NO "'0' F.r' - TESTING 60.M° 10-00 w oo .6,= 9�. `°"'Tr°" PROTRACTED SEC. 13 T1ON R12W GSE 1,OA465S R. .1mss SHEET EWA SANG a LANECGCC, Iiikvr Alaska.LLC 1 P SEWARD MERIDIAN,ALASKA °` 3 Page 43 Revision 0 May, 2017 • • GP 22-13RD3 Drilling Procedure Rev 0 Ililrorp:Ua.ka.1.1.1' NAD 27 WELL SLOT NORTHING EASTING LATITUDE(N) LONGITUDE(W) CL LEG 3 2544545.120 263404.821 60"57'29.26234" 151°19'52.28588" 31-13 1 2544550.59 263401.139 60°57'29.31546" 151°19'52.36268" 22-13RD2 2 2544551.711 263405.531 60"57'29.32737" 151°19'52.27421" MUCI-1 3 2544549.723 263409.592 60°57'29.30862" 151°19'52.19116" MUCI-2 4 2544545.606 263411.397 60°57'29.26844" 151°19'52.15293" 32-13RD 5 2544541.274 263410.117 60'57'29.22553" 151°19'52.17707" LEG 3 24-13RD 6 2544538.84 263406.528 60°57'29.20086" 151°19'52.24873" 42-23RD 7 2544539.235 263401.999 60°57'29.20384" 151°19'52.34061" 43063 8 2544542.441 263398.892 60°57'29.23478" 151°19'52.40484" 11-13RD 9 2544546.905 263398.51 60°57'29.27865" 151°19'52.41439" EMPTY 10 2544543.272 263406.149 60°57'29.24441" 151°19'52.25823" GP-50 11 2544545.15 263402.616 60°57'29.26219" 151°19'52.33053" GP-51 12 2544547.233 263405.593 60°57'29.28330" 151°19'52.27110" CL LEG 4 2544501.349 263337.774 60°57'28.81798" 151°19'53.62548" EMPTY 1 2544506.617 263333.993 60°57'28.86909" 151°19'53.70421" EMPTY 2 2544507.720 263338.358 60°57'28.88083" 151°19'53.61627" 54 3 2544505.736 263342.508 60°57'28.86212" 151°19'53.53143" 55 4 2544501.552 263344.322 60"57'28.82129" 151°19'53.49299" 53 5 2544497.344 263342.958 60°57'28.77958" 151°19'53.51888" LEG 4 52 6 2544494.923 263339.453 60"57'28.75505" 151°19'53.58885" EMPTY 7 2544495.296 263334.763 60°57'28.75778" 151°19'53.68396" EMPTY 8 2544498.575 263331.660 60°57'28.78944" 151°19'53.74816" EMPTY 9 2544503.081 263331.389 60°57'28.83376" 151"19'53.75548" EMPTY 10 2544499.473 263338.980 60°57'28.79975" 151°19'53.60030" EMPTY 11 2544501.035 263335.567 60°57'28.81445" 151°19'53.67005" EMPTY 12 2544503.340 263338.779 60"57'28.83779" 151°19'53.60597" Pas-"' HILCORP ALASKA.LLC REYISOV GRANITE POINT PLATFORM WELL SLOTS DATE SO IS COOK INLET ALASKA DRAWN ST KB AS BUILT SURFACE LOCATION NAD 27(FOR INFORMATION ONLY) PROJECT NO ,TTGO 4`:t-'VEERING %UPPING SUR.EYING.TESTING BOOK NO 10.01 P O BCE SOLGOTNw 4K 99064 "vrtE (9CTj 201-4210 ERB'.(WTI 201 LK, `°""'°'" PROTRACTED SEC. 13 T1ON R12W 5/TEE E.WI SE.MC..NES.CUNECGCC. Flavor!)Ala�kn. I.I(: °` 3 SEWARD MERIDIAN,ALASKA • • GP 22-13RD3 Drilling Procedure Rev 0 Itilcorp Alaska. 33.0 Directional Program (wp05) Page 45 Revision 0 May, 2017 • • Hilcorp Alaska, LLC Granite Point Granite Point Platform Plan: GP-22-13RD3 Plan: GP 22-13RD3 Plan: GP 22-13RD3 WP05 Standard Proposal Report 19 May, 2017 • HALLIBURTON �.# Sperry Drilling Services HALLIBURTON i SECTION DE* Sperry Drilling Sec MD Inc Azi TVD +NI-S +E/-W Dleg TFace VSect Target 1 8500.00 54.27 92.58 8153.98 335.44 1390.32 0.00 0.00 1102.52 2 8517.08 55.33 94.81 8163.82 334.54 1404.25 12.30 60.00 1115.43 3 8537.08 55.33 94.81 8175.20 333.16 1420.64 0.00 0.00 1130.77 Ji-iiiicorp 4 9218.66 32.25 146.04 8678.87 151.05 1818.53 6.00 140.54 1568.22 5 10572.53 32.25 146.04 9823.88 -448.18 2222.07 0.00 0.00 2193.62 6 10994.10 55.00 129.51 10128.00 -654.69 2421.35 6.00 -33.06 2463.27 GP 22-13RD3 C7 Tgt Project: Granite Point 7 11238.07 69.64 129.51 10241.03 -791.77 2587.58 6.00 0.01 2672.77 Site: Granite Point Platform 8 13068.73 69.64 129.51 10878.00 -1883.72 3911.68 0.00 0.00 4341.56 GP 22-13RD3 TD Tgt 9 13168.73 69.64 129.51 10912.79 -1943.36 3984.01 0.00 0.00 4432.72 Well: Plan: GP-22-13RD3 Wellbore: Plan: GP 22-13RD3 Design: GP 22-13RD3 WP05 SURVEY PROGRAM Date:2017-05-11T00:00:00 Validated:Yes Version: WELL DETAILS: Plan:GP-22-13RD3 Depth From Depth To Survey/Plan Tool Water Depth: 75.00 / 33.00 5713.00 GP22-13RD GCT(1)(GP 22-13 PB1) NSG_WL +N/-5 +E/-W Northing Easting Latittude Longitude 5733.00 6653.00 GP22-13RD GCT(2)(GP-22-13) NSG_WL 0.00 0.00 2544551.71 263405.53 60°57'29.327 N 151°19'52.274 W 6751.00 8500.00 MWD(GP-22-13RD PB1) MWD 8500.00 13168.73 GP 22-13RD3 WP05 MWD+SC+sag CASING DETAILS TVD TVDSS MD Size DDI = 6.064 8153.98 8025.98 8500.00 7" 10912.80 10784.80 13168.73 41/2"x6° Start Dir 12.3°/100':8500'MD,8153.98'TVD:60°RT TF - 1500 7500- 7 00 �, 0000 ,- End Dir :8517.08'MD,8163.82'TVD 66 �O 0- 1 _ 8000 _0_- Start Dir 6°/100':8537.08'MD,8175.2'ND �' -- -- 8250- O 500 N 8500 7 00 End Dir :9218.66'MD,8678.87'TVD 1000 1000 0 .0 000 Start Dir 6°/100':10572.53'MD,9823.88'TVD in 9 i, 1500 L 9000 9000 100,E 0000 End Dir :11238.07'MD,10241.03'TVD - � C2 000 Total Depth:13168.73'MD,10912.79'ND 2000- 2000 0 - 9500 00 ,.'` h00 ab a 9750- C5 10y 00 .��- GP-22-13RD PB1 ) 2500 - GP-22-13 ,�O ' - 0 o C6 /0000 0�6 0 0 0 ,70 0 O ' GP-22-13RD 3000 3000 1p230 CT ;v r.? ��'o P 10500- �' rh'-� -1 3500 H A GP-22-13RD2 13 3/8" GP 22-13RD3 C7 Tgt 13: -- 4000 ° .000 - -4 1/2' '13,1,69 11250-- GP 22-13RD3 TD T 4500 �P 22-13RD3 WP05 u , i i I I r r I l I I I F l F , I l I I I I l I i i i l i i i I l-, 1 ! I I I r I I I I I 1 O 5000 5000 -750 0 750 1500 2250 3000 3750 4500 5250 6000 6750 o G 22-13 P81 5500 Vertical Section at 116.00°(1500 usft/in) fl- 6000--- 5955-' 6000 FORMATION TOP DETAILS a) O TVDPath TVDssPath MDPath Formation m 9 5/8"_, '6500 9108.00 8980.00 9726.07 C2 o 9528.00 9400.00 10222.68 C5 9758.00 9630.00 10494.64 C6 7000- 7000 -90p0 10128.00 10000.00 10994.10 C7 as 00 7500 15 00 I 9) 000 0 8000 -- 800. -0h 00 - . �O 8500 7 00 000 .o 9000- 9000 X00 - C2 10 00 00 GP-22-13RD PB1 y,‘,^^p -GP-22-13 C5 10 0o o MO % GP-22-13RD 10000- C6 °' .wn�0o ,, HilcorpAlaska,LLC 10230 C7 �.• .f'GP-22-13RD2 Calculation Method: Minimum Curvature - Error System: ISCWSA - 13934 Scan Method: Closest Approach 3D 11000 4 1/2,. Error Surface: Elliptical Conic ,13169 Warning Method: Error Ratio GP 22-13RD3 C7 Tgt GP 22-13RD3 WP05 REFERENCE INFORMATION 12000 Co-ordinate(N/E)Reference:Well Plan:GP-22-13RD3,True North - GP 22-13RD3 TD Tgt Vertical(ND)Reference: GP 22-13RD3 @ 128.00usft - Measured Depth Reference: GP 22-13RD3©128.O0usft Calculation Method: Minimum Curvature iiiiIiiiiIiFIIFFIiFIIIIFIIIIIIiiiiliiiiIiiiFII FFIIIIi ilii iiia FIIIIiiiil 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 Vertical Section at 116.00°(2000 usft/in) • • HALLIBURTON Project: Granite Point WELL DETAILS:PI=GP-22-13RD3 ePe r>•Drilling Site: Granite Point Platform Water Depth: 75.00 Well: Plan:GP-22-13RD3 +IN/-S +E/-W Northing Fasting [atittude Longitude c� Wellbore: Plan:GP 22-13803 0.00 0.00 2544551.71 263405.53 60°5729.327N 151°1052.274W E/ I Iil1•urjl ry���o Plan: GP 22-13803 WP05 C 'o GR-22-13RD Pal n o $ GP-2'_-13120 I 8 N a '''-'2, 8 8 n dg d aM� S J °° 0 0 2 S _ 333 q - AJ er�?.� % 7'79 End Dr:9218.66 MD,8678.87 TVD $ —_ l. c _ Albrn- 9 5/8" � 8,, L - d 'a 1 0— 'b I33Bq p .ff 0 a3 , � 49S`15 1TSSo SO 3P' 100P. Start Dir 6T100:10572.53'MD,9823.88TVD 9`r\s..- ps sio°°' bl��g5,^ QST -333— 5'3 V S'��1 9�5e S _ .s.`‘‘. End Dir:11238.07 MD,10241.03'TVD o -667— o - OP22.13RD3C7T6t '� i- CASING DETAILS -1000 • - - TVD TVDSS MD Name 8153.98 8025.98 8500,00 7" - 10912.80 10784.80 13168.73 41/7' e -1333— REFERENCE INFORMATION — Co-ordinate(WE)Reference:Well Plan:GP-22-13R03,True North — Vertical(TVD)Reference:GP22-13RD3 et 12000ulS Measured Depth Reference:GP 22-13803 e 128.000,5 — Calculation Method:Minimum Curvature yo Total Depth:I3168.73'MD,10912.79'TVD `o' -1667— �1 3` -2000— CP 22-13RD)Il)lgt u Oap 4 12" -2333— 111111 : i111111 1111 : 11i11111111111111II : : : 11111111111111111111111111 : : III i 0 333 667 1000 1333 1667 2000 2333 2667 3000 3333 3667 4000 4333 4667 West(-)/East(+)(500 usft/in) • 1 Halliburton I-IALLIBURTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: jiff, Well Plan:GP-22-13RD3 Company: Hilcorn Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: �.f Granite Point MD Reference: GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature r Wellbore Plan:GP 22-13RD3 a Design: GP 22-13RD3 WP05 Project Granite Point Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Granite Point Platform Site Position: Northing: 2,544,544.00 usft Latitude: 60°57 29.251 N From: Map Easting: 263,401.00 usft Longitude: 151°19'52.363 W Position Uncertainty: 0.00 usft Slot Radius: 13.200 in Grid Convergence: -1.16 ° Plan:GP-22-13RD3,Leg3 Slot2 Well Position +NI-S 0.00 usft Northing: 2,544,551.71 usft Latitude: 60°57'29.327 N +E/-W 0.00 usft Easting: 263,405.53 usft Longitude: 151°19'52.274 W Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Water Depth: 75.00 usft Wellbore f Plan:GP 22-13RD3 Magnetics Model Name Sample Datetii Declination Dip Angle Field Strength L _ BGGM2016 5/11/2017 16.16 73.86 55,498 Design GP 22-13RD3 WP05 Audit Notes: Version: Phase: PLAN Tie On Depth: 8,500.00 Vertical Section: Depth From(TVD) -S- +N/ .: +E/-W "' ' Direction (usft) (usft), (usft) (1 0.00 0.00 0.00 116.00 Plan Sections w Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S Rate Rate Rate .' Tool Face ,z. (usft) (°) (°) (usft) .,usft (usft) = (°/100usft) (°/100usft) (°/100usft) (1 8,500.00 54.27 92.58 8,153.98 8,025.98 335.44 1,390.32 0.00 0.00 0.00 0.00 8,517.08 55.33 94.81 8,163.82 8,035.82 334.54 1,404.25 12.30 6.15 12.95 60.00 8,537.08 55.33 94.81 8,175.20 8,047.20 333.16 1,420.64 0.00 0.00 0.00 0.00 9,218.66 32.25 146.04 8,678.87 8,550.87 151.05 1,818.53 6.00 -3.39 7.52 140.54 10,572.53 32.25 146.04 9,823.88 9,695.88 -448.18 2,222.07 0.00 0.00 0.00 0.00 10,994.10 55.00 129.51 10,128.00 10,000.00 -654.69 2,421.35 6.00 5.40 -3.92 -33.06 11,238.07 69.64 129.51 10,241.03 10,113.03 -791.77 2,587.58 6.00 6.00 0.00 0.01 13,068.73 69.64 129.51 10,878.00 10,750.00 -1,883.72 3,911.68 0.00 0.00 0.00 0.00 13,168.73 69.64 129.51 10,912.79 10,784.79 -1,943.36 3,984.01 0.00 0.00 0.00 0.00 5/19/2017 10:59:44AM Page 2 COMPASS 5000.1 Build 81 III • Halliburton -IALLI B U RTO N Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: y Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: �, True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 x nr -i Design: GP 22-13RD3 WP05 7 Planned Survey f,. g ' te .n x Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss ;. +NI-S +EI-W Northing Easting ,3 DLS Vert Section ' (usft) (°) (°) (usft) ;usft (usft) :"- (usft) 1 (usft) ,' (usft) . ` -128.00 .-' 0.00 0.00 0.00 0.00 -128.00 0.00 0.00 2,544,551.71 263,405.53 0.00 0.00 33.00 0.39 192.00 33.00 -95.00 -0.11 -0.02 2,544,551.60 263,405.51 1.18 0.03 53.00 0.40 198.00 53.00 -75.00 -0.24 -0.06 2,544,551.47 263,405.47 0.21 0.05 73.00 0.32 213.00 73.00 -55.00 -0.36 -0.11 2,544,551.36 263,405.41 0.61 0.06 93.00 0.16 219.00 93.00 -35.00 -0.42 -0.16 2,544,551.29 263,405.36 0.81 0.04 113.00 0.12 227.00 113.00 -15.00 -0.46 -0.19 2,544,551.25 263,405.33 0.22 0.03 133.00 0.11 244.00 133.00 5.00 -0.48 -0.22 2,544,551.23 263,405.30 0.18 0.01 153.00 0.12 266.00 153.00 25.00 -0.49 -0.26 2,544,551.22 263,405.26 0.22 -0.02 173.00 0.16 276.00 173.00 45.00 -0.49 -0.31 2,544,551.23 263,405.21 0.23 -0.06 193.00 0.23 274.00 193.00 65.00 -0.49 -0.38 2,544,551.23 263,405.14 0.35 -0.13 213.00 0.35 272.00 213.00 85.00 -0.48 -0.48 2,544,551.24 263,405.04 0.60 -0.22 233.00 0.50 268.00 233.00 105.00 -0.48 -0.63 2,544,551.24 263,404.89 0.76 -0.35 253.00 0.65 263.00 253.00 125.00 -0.50 -0.83 2,544,551.23 263,404.69 0.79 -0.53 273.00 0.71 261.00 273.00 145.00 -0.53 -1.06 2,544,551.20 263,404.46 0.32 -0.72 293.00 0.70 262.00 292.99 164.99 -0.57 -1.31 2,544,551.17 263,404.21 0.08 -0.93 313.00 0.55 266.00 312.99 184.99 -0.59 -1.52 2,544,551.15 263,404.00 0.78 -1.11 333.00 0.32 294.00 332.99 204.99 -0.58 -1.67 2,544,551.17 263,403.85 1.53 -1.25 353.00 0.53 125.00 352.99 224.99 -0.61 -1.65 2,544,551.14 263,403.87 4.23 -1.21 373.00 1.59 42.00 372.99 244.99 -0.45 -1.38 2,544,551.29 263,404.14 8.07 -1.05 393.00 3.11 49.00 392.97 264.97 0.11 -0.79 2,544,551.84 263,404.74 7.72 -0.76 413.00 4.96 52.00 412.92 284.92 1.00 0.30 2,544,552.70 263,405.85 9.31 -0.17 433.00 6.35 53.00 432.82 304.82 2.20 1.87 2,544,553.87 263,407.44 6.97 0.72 453.00 6.87 53.00 452.69 324.69 3.58 3.71 2,544,555.22 263,409.31 2.60 1.76 473.00 7.01 53.00 472.54 344.54 5.03 5.64 2,544,556.63 263,411.27 0.70 2.86 493.00 7.03 53.00 492.39 364.39 6.51 7.59 2,544,558.06 263,413.25 0.10 3.97 513.00 7.11 54.00 512.24 384.24 7.97 9.57 2,544,559.48 263,415.26 0.73 5.10 533.00 7.16 54.00 532.09 404.09 9.43 11.58 2,544,560.90 263,417.30 0.25 6.27 553.00 7.15 54.00 551.93 423.93 10.89 13.59 2,544,562.33 263,419.34 0.05 7.44 573.00 7.12 55.00 571.78 443.78 12.34 15.61 2,544,563.73 263,421.39 0.64 8.62 593.00 7.03 55.00 591.62 463.62 13.75 17.63 2,544,565.10 263,423.44 0.45 9.82 613.00 7.01 56.00 611.47 483.47 15.13 19.65 2,544,566.44 263,425.48 0.62 11.02 633.00 6.83 56.00 631.33 503.33 16.48 21.64 2,544,567.75 263,427.50 0.90 12.23 653.00 6.74 56.00 651.19 523.19 17.80 23.60 2,544,569.03 263,429.49 0.45 13.41 673.00 6.71 56.00 671.05 543.05 19.11 25.54 2,544,570.30 263,431.46 0.15 14.58 693.00 6.51 56.00 690.92 562.92 20.40 27.45 2,544,571.55 263,433.39 1.00 15.73 713.00 6.23 56.00 710.79 582.79 21.64 29.29 2,544,572.75 263,435.26 1.40 16.84 733.00 6.06 55.00 730.68 602.68 22.85 31.06 2,544,573.93 263,437.04 1.00 17.89 753.00 5.85 55.00 750.57 622.57 24.04 32.76 2,544,575.08 263,438.77 1.05 18.90 773.00 5.70 54.00 770.47 642.47 25.21 34.39 2,544,576.22 263,440.43 0.90 19.86 793.00 5.46 54.00 790.37 662.37 26.36 35.97 2,544,577.33 263,442.03 1.20 20.77 813.00 5.29 53.00 810.29 682.29 27.47 37.47 2,544,578.41 263,443.55 0.97 21.64 833.00 5.11 53.00 830.20 702.20 28.56 38.92 2,544,579.47 263,445.02 0.90 22.46 853.00 4.96 52.00 850.13 722.13 29.63 40.31 2,544,580.51 263,446.44 0.87 23.24 873.00 4.84 52.00 870.05 742.05 30.68 41.66 2544,581.54 263,447.80 0.60 23.99 893.00 4.77 51.00 889.98 761.98 31.72 42.97 2,544,582.55 263,449.14 0.55 24.71 5/19/2017 10:59:44AM Page 3 COMPASS 5000.1 Build 81 • • Halliburton I-IALLIBURTON Standard Proposal Report H Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: ,,,..- , ,,,oi,11:z! GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: True Well: Plan:GP-22-13RD3 Survey Calculation Method: .-- Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 , « ,+ wfi Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Fasting DLS Vert Section ;_ (usft) (°) (°) (usft) usft (usft) , (usft) (usft) (usft) 781.92 913.00 4.75 50.00 909.92 781.92 32.78 44.25 2,544,583.58 263,450.44 0.43 25.40 933.00 4.66 49.00 929.85 801.85 33.84 45.50 2,544,584.62 263,451.71 0.61 26.06 953.00 4.62 48.00 949.78 821.78 34.92 46.71 2,544,585.67 263,452.94 0.45 26.68 973.00 4.62 48.00 969.72 841.72 35.99 47.91 2,544,586.72 263,454.16 0.00 27.28 993.00 4.64 48.00 989.65 861.65 37.07 49.11 2,544,587.78 263,455.38 0.10 27.88 1,013.00 4.66 48.00 1,009.59 881.59 38.16 50.31 2,544,588.84 263,456.61 0.10 28.49 1,033.00 4.68 48.00 1,029.52 901.52 39.25 51.52 2,544,589.90 263,457.84 0.10 29.10 1,053.00 4.70 49.00 1,049.45 921.45 40.33 52.75 2,544,590.96 263,459.09 0.42 29.73 1,073.00 4.71 49.00 1,069.39 941.39 41.41 53.99 2,544,592.01 263,460.35 0.05 30.37 1,093.00 4.71 50.00 1,089.32 961.32 42.47 55.24 2,544,593.05 263,461.62 0.41 31.02 1,113.00 4.76 50.00 1,109.25 981.25 43.54 56.50 2,544,594.09 263,462.90 0.25 31.69 1,133.00 4.76 50.00 1,129.18 1,001.18 44.60 57.77 2,544,595.13 263,464.19 0.00 32.37 1,153.00 4.78 50.00 1,149.11 1,021.11 45.67 59.05 2,544,596.17 263,465.49 0.10 33.05 1,173.00 4.80 50.00 1,169.04 1,041.04 46.75 60.32 2,544,597.22 263,466.79 0.10 33.72 1,193.00 4.80 50.00 1,188.97 1,060.97 47.82 61.61 2,544,598.27 263,468.09 0.00 34.41 1,213.00 4.83 50.00 1,208.90 1,080.90 48.90 62.89 2,544,599.32 263,469.40 0.15 35.09 1,233.00 4.85 50.00 1,228.83 1,100.83 49.98 64.19 2,544,600.38 263,470.72 0.10 35.77 1,253.00 4.83 50.00 1,248.76 1,120.76 51.07 65.48 2,544,601.44 263,472.03 0.10 36.46 1,273.00 4.84 50.00 1,268.69 1,140.69 52.15 66.77 2,544,602.50 263,473.34 0.05 37.15 1,293.00 4.84 50.00 1,288.62 1,160.62 53.24 68.06 2,544,603.55 263,474.66 0.00 37.83 1,313.00 4.87 50.00 1,308.54 1,180.54 54.33 69.36 2,544,604.61 263,475.98 0.15 38.52 1,333.00 4.87 50.00 1,328.47 1,200.47 55.42 70.66 2,544,605.68 263,477.30 0.00 39.21 1,353.00 4.86 50.00 1,348.40 1,220.40 56.51 71.96 2,544,606.74 263,478.62 0.05 39.90 1,373.00 4.86 51.00 1,368.33 1,240.33 57.59 73.27 2,544,607.79 263,479.95 0.42 40.60 1,393.00 4.87 51.00 1,388.26 1,260.26 58.65 74.58 2,544,608.83 263,481.29 0.05 41.32 1,413.00 4.89 51.00 1,408.18 1,280.18 59.72 75.91 2,544,609.88 263,482.63 0.10 42.04 1,433.00 4.89 51.00 1,428.11 1,300.11 60.80 77.23 2,544,610.92 263,483.98 0.00 42.76 1,453.00 4.90 51.00 1,448.04 1,320.04 61.87 78.56 2,544,611.97 263,485.33 0.05 43.48 1,473.00 4.89 51.00 1,467.96 1,339.96 62.94 79.88 2,544,613.02 263,486.67 0.05 44.20 1,493.00 4.93 51.00 1,487.89 1,359.89 64.02 81.21 2,544,614.07 263,488.03 0.20 44.93 1,513.00 4.92 51.00 1,507.82 1,379.82 65.10 82.55 2,544,615.12 263,489.38 0.05 45.65 1,533.00 4.95 51.00 1,527.74 1,399.74 66.18 83.89 2,544,616.18 263,490.74 0.15 46.38 1,553.00 4.92 51.00 1,547.67 1,419.67 67.27 85.22 2,544,617.23 263,492.10 0.15 47.11 1,573.00 4.94 51.00 1,567.59 1,439.59 68.35 86.56 2,544,618.29 263,493.46 0.10 47.83 1,593.00 4.95 51.00 1,587.52 1,459.52 69.43 87.90 2,544,619.34 263,494.82 0.05 48.56 1,613.00 4.98 51.00 1,607.45 1,479.45 70.52 89.24 2,544,620.40 263,496.19 0.15 49.29 1,633.00 4.97 51.00 1,627.37 1,499.37 71.61 90.59 2,544,621.47 263,497.56 0.05 50.02 1,653.00 4.97 51.00 1,647.29 1,519.29 72.71 91.94 2,544,622.53 263,498.92 0.00 50.76 1,673.00 4.97 51.00 1,667.22 1,539.22 73.80 93.28 2,544,623.59 263,500.29 0.00 51.49 1,693.00 5.02 51.00 1,687.14 1,559.14 74.89 94.64 2,544,624.66 263,501.67 0.25 52.22 1,713.00 5.00 51.00 1,707.07 1,579.07 75.99 96.00 2,544,625.73 263,503.05 0.10 52.96 1,733.00 5.01 51.00 1,726.99 1,598.99 77.09 97.35 2,544,626.80 263,504.42 0.05 53.70 1,753.00 5.04 51.00 1,746.91 1,618.91 78.19 98.71 2,544,627.88 263,505.81 0.15 54.44 1,773.00 5.06 51.00 1,766.84 1,638.84 79.30 100.08 2,544,628.96 263,507.20 0.10 55.18 1,793.00 5.09 51.00 1,786.76 1,658.76 80.41 101.46 2,544,630.04 263,508.60 0.15 55.93 5/19/2017 10:59:44AM Page 4 COMPASS 5000.1 Build 81 s s Halliburton HALLI B U RTO N Standard Proposal Report _ Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: i GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: ., True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 )_ Design: GP 22-13RD3 WP05 $sr _ . Planned Survey r, t 0 Measured Vertical Map c Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing ,. Easting DLS Vert Section t.., (usft) (a) (°) (usft) ; usft (usft) ;: (usft) (usft) (usft) 1,678.68 1,813.00 5.11 51.00 1,806.68 1,678.68 81.53 102.84 2,544,631.13 263,510.00 0.10 56.68 1,833.00 5.09 51.00 1,826.60 1,698.60 82.65 104.22 2,544,632.22 263,511.40 0.10 57.43 1,853.00 5.12 51.00 1,846.52 1,718.52 83.77 105.60 2,544,633.32 263,512.81 0.15 58.19 1,873.00 5.07 50.00 1,866.44 1,738.44 84.90 106.97 2,544,634.42 263,514.20 0.51 58.92 1,893.00 5.11 51.00 1,886.36 1,758.36 86.03 108.34 2,544,635.52 263,515.59 0.49 59.66 1,913.00 5.16 51.00 1,906.28 1,778.28 87.16 109.73 2,544,636.62 263,517.01 0.25 60.42 1,933.00 5.15 50.00 1,926.20 1,798.20 88.30 111.12 2,544,637.73 263,518.42 0.45 61.16 1,953.00 5.17 50.00 1,946.12 1,818.12 89.45 112.50 2,544,638.86 263,519.82 0.10 61.89 1,973.00 5.24 50.00 1,966.04 1,838.04 90.62 113.89 2,544,640.00 263,521.23 0.35 62.63 1,993.00 5.19 50.00 1,985.96 1,857.96 91.79 115.28 2,544,641.14 263,522.65 0.25 63.37 2,013.00 5.22 50.00 2,005.87 1,877.87 92.96 116.67 2,544,642.27 263,524.06 0.15 64.11 2,033.00 5.20 50.00 2,025.79 1,897.79 94.12 118.06 2,544,643.41 263,525.48 0.10 64.85 2,053.00 5.26 50.00 2,045.71 1,917.71 95.29 119.46 2,544,644.56 263,526.90 0.30 65.59 2,073.00 5.24 50.00 2,065.62 1,937.62 96.47 120.86 2,544,645.70 263,528.32 0.10 66.33 2,093.00 5.27 50.00 2,085.54 1,957.54 97.65 122.26 2,544,646.85 263,529.75 0.15 67.08 2,113.00 5.26 49.00 2,105.45 1,977.45 98.84 123.66 2,544,648.02 263,531.17 0.46 67.81 2,133.00 5.29 50.00 2,125.37 1,997.37 100.03 125.06 2,544,649.18 263,532.59 0.48 68.54 2,153.00 5.32 50.00 2,145.28 2,017.28 101.22 126.47 2,544,650.34 263,534.03 0.15 69.29 2,173.00 5.32 50.00 2,165.20 2,037.20 102.41 127.89 2,544,651.50 263,535.47 0.00 70.05 2,193.00 5.32 49.00 2,185.11 2,057.11 103.62 129.30 2,544,652.68 263,536.91 0.46 70.79 2,213.00 5.35 50.00 2,205.03 2,077.03 104.83 130.72 2,544,653.86 263,538.35 0.49 71.53 2,233.00 5.32 50.00 2,224.94 2,096.94 106.02 132.14 2,544,655.02 263,539.79 0.15 72.28 2,253.00 5.30 50.00 2,244.85 2,116.85 107.21 133.56 2,544,656.18 263,541.24 0.10 73.04 2,273.00 5.28 50.00 2,264.77 2,136.77 108.40 134.97 2,544,657.34 263,542.67 0.10 73.79 2,293.00 5.31 50.00 2,284.68 2,156.68 109.58 136.39 2,544,658.50 263,544.11 0.15 74.54 2,313.00 5.35 50.00 2,304.60 2,176.60 110.78 137.81 2,544,659.66 263,545.56 0.20 75.29 2,333.00 5.36 50.00 2,324.51 2,196.51 111.98 139.24 2,544,660.83 263,547.01 0.05 76.05 2,353.00 5.34 50.00 2,344.42 2,216.42 113.18 140.67 2,544,662.00 263,548.46 0.10 76.81 2,373.00 5.35 50.00 2,364.33 2,236.33 114.37 142.09 2,544,663.17 263,549.91 0.05 77.57 2,393.00 5.37 50.00 2,384.25 2,256.25 115.57 143.53 2,544,664.34 263,551.37 0.10 78.33 2,413.00 5.39 50.00 2,404.16 2,276.16 116.78 144.96 2,544,665.52 263,552.83 0.10 79.09 2,433.00 5.42 50.00 2,424.07 2,296.07 117.99 146.41 2,544,666.70 263,554.30 0.15 79.86 2,453.00 5.45 50.00 2,443.98 2,315.98 119.21 147.86 2,544,667.89 263,555.77 0.15 80.63 2,473.00 5.42 50.00 2,463.89 2,335.89 120.43 149.31 2,544,669.08 263,557.25 0.15 81.40 2,493.00 5.42 50.00 2,483.80 2,355.80 121.64 150.76 2,544,670.26 263,558.72 0.00 82.17 2,513.00 5.44 50.00 2,503.71 2,375.71 122.86 152.21 2,544,671.45 263,560.19 0.10 82.94 2,533.00 5.47 50.00 2,523.62 2,395.62 124.08 153.66 2,544,672.64 263,561.68 0.15 83.71 2,553.00 5.47 50.00 2,543.53 2,415.53 125.30 155.12 2,544,673.83 263,563.16 0.00 84.48 2,573.00 5.45 50.00 2,563.44 2,435.44 126.53 156.58 2,544,675.03 263,564.64 0.10 85.26 2,593.00 5.46 50.00 2,583.35 2,455.35 127.75 158.04 2,544,676.22 263,566.12 0.05 86.03 2,613.00 5.49 50.00 2,603.26 2,475.26 128.98 159.50 2,544,677.42 263,567.61 0.15 86.81 2,633.00 5.48 50.00 2,623.16 2,495.16 130.21 160.96 2,544,678.62 263,569.10 0.05 87.58 2,653.00 5.48 50.00 2,643.07 2,515.07 131.43 162.43 2,544,679.81 263,570.59 0.00 88.36 2,673.00 5.50 50.00 2,662.98 2,534.98 132.66 163.89 2,544,681.01 263,572.08 0.10 89.14 2,693.00 5.50 50.00 2,682.89 2,554.89 133.90 165.36 2,544,682.21 263,573.57 0.00 89.92 5/19/2017 10:59:44AM Page 5 COMPASS 5000.1 Build 81 0 • Halliburton I-IAL.LIBIJRTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: . Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: ,-,..4.4v-ter:ilii GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: True Well: Plan:GP-22-13RD3 Survey Calculation Method: 1 Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 '� Planned Survey Measured Vertical Map �}t Map Depth Inclination Azimuth Depth TVDss +NIS +E/-W Northing Eastmz g DLS Vert Section (usft) (°) (°) (usft) usft ,.: (usft) ::.(usft) (usft) (usft) +' 2,574.80 2,713.00 5.49 49.00 2,702.80 2,574.80 135.14 166.82 2,544,683.43 263,575.05 0.48 90.68 2,733.00 5.50 50.00 2,722.71 2,594.71 136.38 168.27 2,544,684.64 263,576.53 0.48 91.45 2,753.00 5.51 49.00 2,742.61 2,614.61 137.63 169.73 2,544,685.86 263,578.02 0.48 92.21 2,773.00 5.53 49.00 2,762.52 2,634.52 138.89 171.18 2,544,687.09 263,579.49 0.10 92.96 2,793.00 5.52 49.00 2,782.43 2,654.43 140.15 172.64 2,544,688.32 263,580.97 0.05 93.72 2,813.00 5.55 49.00 2,802.33 2,674.33 141.42 174.09 2,544,689.56 263,582.45 0.15 94.47 2,833.00 5.53 49.00 2,822.24 2,694.24 142.69 175.55 2,544,690.80 263,583.94 0.10 95.22 2,853.00 5.53 49.00 2,842.15 2,714.15 143.95 177.00 2,544,692.03 263,585.42 0.00 95.98 2,873.00 5.47 50.00 2,862.06 2,734.06 145.20 178.46 2,544,693.25 263,586.90 0.57 96.74 2,893.00 5.49 50.00 2,881.96 2,753.96 146.42 179.92 2,544,694.44 263,588.39 0.10 97.52 2,913.00 5.46 50.00 2,901.87 2,773.87 147.65 181.39 2,544,695.64 263,589.87 0.15 98.29 2,933.00 5.46 50.00 2,921.78 2,793.78 148.87 182.84 2,544,696.83 263,591.35 0.00 99.07 2,953.00 5.50 51.00 2,941.69 2,813.69 150.09 184.32 2,544,698.02 263,592.85 0.52 99.86 2,973.00 5.48 50.00 2,961.60 2,833.60 151.31 185.79 2,544,699.21 263,594.35 0.49 100.65 2,993.00 5.46 50.00 2,981.51 2,853.51 152.53 187.25 2,544,700.40 263,595.84 0.10 101.43 3,013.00 5.45 50.00 3,001.42 2,873.42 153.75 188.71 2,544,701.59 263,597.32 0.05 102.20 3,033.00 5.46 50.00 3,021.33 2,893.33 154.97 190.17 2,544,702.79 263,598.80 0.05 102.97 3,053.00 5.48 50.00 3,041.24 2,913.24 156.20 191.63 2,544,703.98 263,600.29 0.10 103.75 3,073.00 5.42 50.00 3,061.15 2,933.15 157.42 193.08 2,544,705.17 263,601.77 0.30 104.52 3,093.00 5.46 50.00 3,081.06 2,953.06 158.64 194.54 2,544,706.36 263,603.24 0.20 105.29 3,113.00 5.44 51.00 3,100.97 2,972.97 159.85 196.00 2,544,707.54 263,604.73 0.49 106.08 3,133.00 5.43 50.00 3,120.88 2,992.88 161.05 197.46 2,544,708.71 263,606.22 0.48 106.87 3,153.00 5.43 50.00 3,140.79 3,012.79 162.27 198.91 2,544,709.90 263,607.69 0.00 107.64 3,173.00 5.43 51.00 3,160.70 3,032.70 163.47 200.37 2,544,711.07 263,609.18 0.47 108.42 3,193.00 5.34 51.00 3,180.61 3,052.61 164.65 201.83 2,544,712.23 263,610.66 0.45 109.21 3,213.00 5.33 51.00 3,200.52 3,072.52 165.83 203.28 2,544,713.37 263,612.13 0.05 110.00 3,233.00 5.33 52.00 3,220.43 3,092.43 166.98 204.73 2,544,714.49 263,613.60 0.46 110.80 3,253.00 5.36 52.00 3,240.35 3,112.35 168.13 206.20 2,544,715.61 263,615.10 0.15 111.62 3,273.00 5.33 52.00 3,260.26 3,132.26 169.28 207.67 2,544,716.73 263,616.59 0.15 112.43 . 3,293.00 5.30 53.00 3,280.17 3,152.17 170.40 209.14 2,544,717.83 263,618.08 0.49 113.26 3,313.00 5.30 53.00 3,300.09 3,172.09 171.52 210.61 2,544,718.91 263,619.58 0.00 114.10 3,333.00 5.32 53.00 3,320.00 3,192.00 172.63 212.09 2,544,719.99 263,621.08 0.10 114.94 3,353.00 5.34 53.00 3,339.92 3,211.92 173.75 213.57 2,544,721.08 263,622.58 0.10 115.78 3,373.00 5.26 53.00 3,359.83 3,231.83 174.86 215.05 2,544,722.16 263,624.08 0.40 116.62 3,393.00 5.23 53.00 3,379.75 3,251.75 175.96 216.51 2,544,723.23 263,625.56 0.15 117.45 3,413.00 5.21 53.00 3,399.66 3,271.66 177.05 217.96 2,544,724.30 263,627.04 0.10 118.28 3,433.00 5.26 53.00 3,419.58 3,291.58 178.15 219.42 2,544,725.36 263,628.52 0.25 119.10 3,453.00 5.24 54.00 3,439.50 3,311.50 179.24 220.89 2,544,726.42 263,630.01 0.47 119.95 3,473.00 5.25 54.00 3,459.41 3,331.41 180.32 222.37 2,544,727.47 263,631.51 0.05 120.81 3,493.00 5.24 54.00 3,479.33 3,351.33 181.39 223.85 2,544,728.51 263,633.01 0.05 121.67 3,513.00 5.20 54.00 3,499.25 3,371.25 182.46 225.32 2,544,729.55 263,634.50 0.20 122.52 3,533.00 5.16 54.00 3,519.17 3,391.17 183.52 226.78 2,544,730.58 263,635.99 0.20 123.37 3,553.00 5.17 54.00 3,539.08 3,411.08 184.58 228.24 2,544,731.61 263,637.46 0.05 124.21 3,573.00 5.16 54.00 3,559.00 3,431.00 185.64 229.70 2,544,732.64 263,638.94 0.05 125.06 3,593.00 5.17 54.00 3,578.92 3,450.92 186.70 231.15 2,544,733.67 263,640.42 0.05 125.90 5/19/2017 10:59:44AM Page 6 COMPASS 5000.1 Build 81 0 i Halliburton HALLIBURTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: £ Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: GP 22-13RD3 @ 128.00usft Site: ;„ Granite Point Platform North Reference: True Well: , Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature .- Wellbore Plan:GP 22-13RD3 _ t Design: :•GP 22-13RD3 WP05 .; ,,., -;, Planned Survey 3 Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E1-W T Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) . 3,470.84 -Al. 3,613.00 5.18 55.00 3,598.84 3,470.84 187.74 232.62 2,544,734.68 263,641.91 0.45 126.76 3,633.00 5.13 55.00 3,618.76 3,490.76 188.77 234.09 2,544,735.68 263,643.40 0.25 127.64 3,653.00 5.13 55.00 3,638.68 3,510.68 189.80 235.56 2,544,736.68 263,644.89 0.00 128.50 3,673.00 5.10 55.00 3,658.60 3,530.60 190.82 237.02 2,544,737.67 263,646.37 0.15 129.37 3,693.00 5.07 55.00 3,678.52 3,550.52 191.84 238.47 2,544,738.66 263,647.84 0.15 130.23 3,713.00 5.08 55.00 3,698.44 3,570.44 192.85 239.92 2,544,739.65 263,649.31 0.05 131.08 3,733.00 5.04 55.00 3,718.36 3,590.36 193.87 241.36 2,544,740.63 263,650.78 0.20 131.94 3,753.00 4.97 55.00 3,738.29 3,610.29 194.87 242.79 2,544,741.60 263,652.22 0.35 132.78 3,773.00 4.96 54.00 3,758.21 3,630.21 195.87 244.20 2,544,742.58 263,653.65 0.44 133.61 3,793.00 4.89 54.00 3,778.14 3,650.14 196.88 245.59 2,544,743.56 263,655.06 0.35 134.42 3,813.00 4.89 53.00 3,798.07 3,670.07 197.90 246.96 2,544,744.54 263,656.45 0.43 135.20 3,833.00 4.87 53.00 3,817.99 3,689.99 198.92 248.32 2,544,745.54 263,657.83 0.10 135.98 3,853.00 4.86 52.00 3,837.92 3,709.92 199.95 249.67 2,544,746.54 263,659.20 0.43 136.73 3,873.00 4.89 52.00 3,857.85 3,729.85 201.00 251.01 2,544,747.56 263,660.56 0.15 137.48 3,893.00 4.89 52.00 3,877.78 3,749.78 202.05 252.35 2,544,748.58 263,661.92 0.00 138.23 3,913.00 4.83 52.00 3,897.70 3,769.70 203.09 253.69 2,544,749.60 263,663.28 0.30 138.97 3,933.00 4.78 51.00 3,917.63 3,789.63 204.13 255.00 2,544,750.62 263,664.61 0.49 139.69 3,953.00 4.78 51.00 3,937.57 3,809.57 205.18 256.29 2544,751.64 263,665.93 0.00 140.39 3,973.00 4.72 50.00 3,957.50 3,829.50 206.24 257.57 2,544,752.67 263,667.23 0.51 141.08 3,993.00 4.68 50.00 3,977.43 3,849.43 207.29 258.82 2,544,753.69 263,668.50 0.20 141.75 4,011.00 4.63 49.10 3,995.37 3,867.37 208.24 259.94 2,544,754.62 263,669.63 0.48 142.33 13 318" 4,013.00 4.63 49.00 3,997.36 3,869.36 208.34 260.06 2,544,754.72 263,669.76 0.48 142.39 4,033.00 4.72 47.00 4,017.30 3,889.30 209.43 261.27 2,544,755.79 263,670.99 0.93 143.00 4,053.00 4.82 49.00 4,037.23 3,909.23 210.55 262.51 2,544,756.87 263,672.25 0.97 143.63 4,073.00 4.86 49.00 4,057.16 3,929.16 211.65 263.78 2,544,757.96 263,673.55 0.20 144.29 4,093.00 4.85 50.00 4,077.08 3,949.08 212.75 265.07 2,544,759.03 263,674.85 0.43 144.96 4,113.00 4.91 52.00 4,097.01 3,969.01 213.82 266.39 2,544,760.07 263,676.20 0.90 145.68 4,133.00 5.00 53.00 4,116.94 3,988.94 214.87 267.76 2,544,761.10 263,677.59 0.62 146.45 4,153.00 5.08 55.00 4,136.86 4,008.86 215.91 269.18 2,544,762.10 263,679.03 0.97 147.28 4,173.00 5.08 58.00 4,156.78 4,028.78 216.88 270.66 2,544,763.05 263,680.53 1.33 148.17 4,193.00 4.94 60.00 4,176.70 4,048.70 217.78 272.15 2,544,763.91 263,682.04 1.12 149.13 4,213.00 4.66 62.00 4,196.63 4,068.63 218.60 273.62 2,544,764.70 263,683.52 1.63 150.08 4,233.00 4.47 67.00 4,216.57 4,088.57 219.28 275.05 2,544,765.35 263,684.97 2.20 151.07 4,253.00 4.39 68.00 4,236.51 4,108.51 219.87 276.48 2,544,765.92 263,686.41 0.56 152.10 4,273.00 4.40 69.00 4,256.45 4,128.45 220.43 277.90 2,544,766.45 263,687.85 0.39 153.13 4,293.00 4.38 70.00 4,276.39 4,148.39 220.97 279.34 2,544,766.95 263,689.29 0.40 154.19 4,313.00 4.50 71.00 4,296.33 4,168.33 221.49 280.80 2,544,767.44 263,690.76 0.71 155.27 4,333.00 4.44 71.00 4,316.27 4,188.27 222.00 282.27 2,544,767.92 263,692.24 0.30 156.37 4,353.00 4.37 71.00 4,336.21 4,208.21 222.50 283.72 2,544,768.39 263,693.71 0.35 157.46 4,373.00 4.36 71.00 4,356.16 4,228.16 222.99 285.16 2,544,768.86 263,695.15 0.05 158.54 4,393.00 4.36 71.00 4,376.10 4,248.10 223.49 286.60 2,544,769.32 263,696.60 0.00 159.61 4,413.00 4.36 72.00 4,396.04 4,268.04 223.97 288.04 2,544,769.77 263,698.05 0.38 160.69 4,433.00 4.29 72.00 4,415.98 4,287.98 224.43 289.48 2,544,770.21 263,699.50 0.35 161.78 4,453.00 4.37 72.00 4,435.93 4,307.93 224.90 290.91 2,544,770.65 263,700.94 0.40 162.87 5/19/2017 10:59:44AM Page 7 COMPASS 5000.1 Build 81 • • Halliburton HALLIBURTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: i' GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: : True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 >. ,._ fl Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W i,.' Northing Easting n DLS ecOpirifTin (usft) (°) (°) (usft) usft (usft) (usft) ; (usft) (usft) '.. 4,327 .87 4,473.00 4.47 72.00 4,455.87 4,327.87 225.38 292.38 2,544,771.09 263,702.42 0.50 163.97 4,493.00 4.43 72.00 4,475.81 4,347.81 225.86 293.86 2,544,771.54 263,703.90 0.20 165.09 4,513.00 4.28 72.00 4,495.75 4,367.75 226.33 295.30 2,544,771.98 263,705.36 0.75 166.18 4,533.00 4.33 72.00 4,515.69 4,387.69 226.79 296.73 2,544,772.42 263,706.79 0.25 167.26 4,553.00 4.22 72.00 4,535.64 4,407.64 227.25 298.15 2,544,772.85 263,708.22 0.55 168.34 4,573.00 4.15 72.00 4,555.58 4,427.58 227.70 299.53 2,544,773.27 263,709.62 0.35 169.39 4,593.00 4.22 71.00 4,575.53 4,447.53 228.17 300.92 2,544,773.71 263,711.01 0.51 170.43 4,613.00 4.19 71.00 4,595.48 4,467.48 228.64 302.30 2,544,774.16 263,712.41 0.15 171.46 4,633.00 4.24 72.00 4,615.42 4,487.42 229.11 303.70 2,544,774.60 263,713.81 0.44 172.51 4,653.00 4.14 71.00 4,635.37 4,507.37 229.57 305.08 2,544,775.03 263,715.20 0.62 173.55 4,673.00 4.03 70.00 4,655.32 4,527.32 230.05 306.43 2,544,775.48 263,716.56 0.66 174.55 4,693.00 4.07 71.00 4,675.27 4,547.27 230.52 307.76 2,544,775.92 263,717.90 0.41 175.54 4,713.00 4.28 71.00 4,695.21 4,567.21 230.99 309.14 2,544,776.37 263,719.28 1.05 176.57 4,733.00 4.29 72.00 4,715.16 4,587.16 231.47 310.55 2,544,776.81 263,720.71 0.38 177.64 4,753.00 4.22 72.00 4,735.10 4,607.10 231.93 311.96 2,544,777.24 263,722.13 0.35 178.71 4,773.00 4.03 72.00 4,755.05 4,627.05 232.37 313.33 2,544,777.66 263,723.51 0.95 179.74 4,793.00 3.97 71.00 4,775.00 4,647.00 232.81 314.65 2,544,778.08 263,724.84 0.46 180.73 4,813.00 3.96 71.00 4,794.96 4,666.96 233.26 315.96 2,544,778.50 263,726.15 0.05 181.71 4,833.00 4.09 69.00 4,814.91 4,686.91 233.74 317.28 2,544,778.95 263,727.48 0.96 182.69 4,853.00 3.97 68.00 4,834.86 4,706.86 234.26 318.59 2,544,779.44 263,728.80 0.70 183.64 4,873.00 3.81 69.00 4,854.81 4,726.81 234.76 319.85 2,544,779.91 263,730.07 0.87 184.55 4,893.00 3.83 70.00 4,874.77 4,746.77 235.22 321.10 2,544,780.35 263,731.33 0.35 185.47 4,913.00 3.90 70.00 4,894.72 4,766.72 235.68 322.37 2,544,780.79 263,732.61 0.35 186.41 4,933.00 3.87 69.00 4,914.67 4,786.67 236.16 323.64 2,544,781.24 263,733.88 0.37 187.34 4,953.00 3.92 68.00 4,934.63 4,806.63 236.66 324.90 2,544,781.71 263,735.16 0.42 188.26 4,973.00 3.87 68.00 4,954.58 4,826.58 237.17 326.16 2,544,782.19 263,736.43 0.25 189.17 4,993.00 3.89 68.00 4,974.54 4,846.54 237.67 327.41 2,544,782.68 263,737.69 0.10 190.07 5,013.00 3.80 69.00 4,994.49 4,866.49 238.16 328.66 2,544,783.14 263,738.95 0.56 190.98 5,033.00 3.80 68.00 5,014.45 4,886.45 238.65 329.89 2,544,783.60 263,740.19 0.33 191.87 5,053.00 3.98 67.00 5,034.40 4,906.40 239.17 331.15 2,544,784.10 263,741.46 0.96 192.77 5,073.00 3.95 66.00 5,054.35 4,926.35 239.72 332.42 2,544,784.62 263,742.74 0.38 193.67 5,093.00 3.94 66.00 5,074.31 4,946.31 240.28 333.67 2,544,785.16 263,744.00 0.05 194.55 5,113.00 3.95 65.00 5,094.26 4,966.26 240.85 334.93 2,544,785.70 263,745.27 0.35 195.43 5,133.00 3.97 66.00 5,114.21 4,986.21 241.42 336.18 2,544,786.25 263,746.54 0.36 196.31 5,153.00 4.00 66.00 5,134.16 5,006.16 241.99 337.45 2,544,786.79 263,747.82 0.15 197.20 5,173.00 3.96 66.00 5,154.11 5,026.11 242.55 338.72 2,544,787.33 263,749.10 0.20 198.09 5,193.00 4.05 68.00 5,174.07 5,046.07 243.10 340.01 2,544,787.84 263,750.39 0.83 199.01 5,213.00 4.14 68.00 5,194.01 5,066.01 243.63 341.33 2,544,788.35 263,751.73 0.45 199.97 5,233.00 4.10 68.00 5,213.96 5,085.96 244.17 342.66 2,544,788.86 263,753.07 0.20 200.93 5,253.00 4.08 68.00 5,233.91 5,105.91 244.71 343.98 2,544,789.37 263,754.40 0.10 201.88 5,273.00 4.09 68.00 5,253.86 5,125.86 245.24 345.31 2,544,789.88 263,755.73 0.05 202.84 5,293.00 4.15 68.00 5,273.81 5,145.81 245.78 346.64 2,544,790.39 263,757.08 0.30 203.80 5,313.00 4.03 68.00 5,293.76 5,165.76 246.31 347.96 2,544,790.90 263,758.41 0.60 204.75 5,333.00 3.92 66.00 5,313.71 5,185.71 246.85 349.24 2,544,791.41 263,759.70 0.88 205.66 5,353.00 3.85 65.00 5,333.66 5,205.66 247.42 350.47 2,544,791.95 263,760.94 0.49 206.52 5/19/2017 10:59:44AM Page 8 COMPASS 5000.1 Build 81 • • Halliburton HALLI B U RTO N Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 s_ Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05i Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +E/-W Northing ' Easting DLS Vert Section (usft) (°) (°) (usft) ii. usft r (usft) (usft) (usft) (usft) 5,225.62 5,373.00 3.85 64.00 5,353.62 5,225.62 247.99 351.68 2,544,792.50 263,762.16 0.34 207.36 5,393.00 4.00 62.00 5,373.57 5,245.57 248.62 352.90 2,544,793.10 263,763.40 1.02 208.18 5,413.00 3.91 61.00 5,393.52 5,265.52 249.27 354.11 2,544,793.73 263,764.62 0.57 208.98 5,433.00 3.99 61.00 5,413.48 5,285.48 249.94 355.32 2,544,794.38 263,765.84 0.40 209.77 5,453.00 4.10 62.00 5,433.43 5,305.43 250.61 356.56 2,544,795.02 263,767.09 0.65 210.59 5,473.00 4.04 63.00 5,453.38 5,325.38 251.27 357.82 2,544,795.65 263,768.37 0.46 211.44 5,493.00 4.02 60.00 5,473.33 5,345.33 251.94 359.05 2,544,796.30 263,769.61 1.06 212.25 5,513.00 4.08 61.00 5,493.28 5,365.28 252.64 360.28 2,544,796.97 263,770.86 0.46 213.05 5,533.00 3.95 61.00 5,513.23 5,385.23 253.32 361.51 2,544,797.62 263,772.10 0.65 213.86 5,553.00 3.83 58.00 5,533.18 5,405.18 254.00 362.68 2,544,798.29 263,773.28 1.18 214.60 5,573.00 3.80 57.00 5,553.14 5,425.14 254.72 363.80 2,544,798.98 263,774.41 0.36 215.30 5,593.00 3.80 56.00 5,573.09 5,445.09 255.45 364.90 2,544,799.69 263,775.53 0.33 215.97 5,613.00 3.81 55.00 5,593.05 5,465.05 256.20 366.00 2,544,800.42 263,776.64 0.34 216.63 5,633.00 3.81 54.00 5,613.01 5,485.01 256.97 367.08 2,544,801.17 263,777.74 0.33 217.26 5,653.00 3.82 54.00 5,632.96 5,504.96 257.76 368.16 2,544,801.93 263,778.83 0.05 217.88 5,673.00 3.79 53.00 5,652.92 5,524.92 258.54 369.22 2,544,802.69 263,779.92 0.36 218.50 5,693.00 3.79 52.00 5,672.87 5,544.87 259.35 370.27 2,544,803.48 263,780.98 0.33 219.09 5,713.00 3.78 50.00 5,692.83 5,564.83 260.18 371.30 2,544,804.29 263,782.02 0.66 219.65 5,733.00 3.83 50.00 5,712.79 5,584.79 261.03 372.31 2,544,805.12 263,783.06 0.25 220.19 5,753.00 3.85 50.00 5,732.74 5,604.74 261.89 373.34 2,544,805.96 263,784.10 0.10 220.73 5,773.00 3.82 50.00 5,752.70 5,624.70 262.75 374.36 2,544,806.80 263,785.14 0.15 221.27 5,793.00 3.90 48.00 5,772.65 5,644.65 263.64 375.38 2,544,807.66 263,786.17 0.78 221.80 5,813.00 4.14 48.00 5,792.60 5,664.60 264.58 376.42 2,544,808.58 263,787.24 1.20 222.32 5,833.00 4.49 50.00 5,812.55 5,684.55 265.56 377.56 2,544,809.54 263,788.39 1.90 222.91 5,853.00 5.24 54.00 5,832.47 5,704.47 266.60 378.90 2,544,810.55 263,789.75 4.11 223.66 5,873.00 6.39 57.00 5,852.37 5,724.37 267.74 380.57 2,544,811.66 263,791.45 5.95 224.66 5,893.00 7.55 59.00 5,872.22 5,744.22 269.03 382.63 2,544,812.90 263,793.53 5.92 225.95 5,913.00 8.19 60.00 5,892.03 5,764.03 270.42 384.99 2,544,814.24 263,795.92 3.27 227.46 5,933.00 8.35 60.00 5,911.83 5,783.83 271.86 387.48 2,544,815.63 263,798.44 0.80 229.07 5,953.00 8.39 61.00 5,931.61 5,803.61 273.29 390.01 2,544,817.01 263,801.00 0.75 230.72 5,973.00 8.41 61.00 5,951.40 5,823.40 274.71 392.57 2,544,818.38 263,803.58 0.10 232.40 5,993.00 8.41 61.00 5,971.18 5,843.18 276.12 395.13 2,544,819.74 263,806.17 0.00 234.07 6,013.00 8.52 61.00 5,990.96 5,862.96 277.55 397.70 2,544,821.12 263,808.77 0.55 235.76 6,033.00 8.68 61.00 6,010.74 5,882.74 279.00 400.32 2,544,822.51 263,811.42 0.80 237.48 6,053.00 8.67 61.00 6,030.51 5,902.51 280.46 402.96 2,544,823.92 263,814.09 0.05 239.21 6,073.00 8.61 62.00 6,050.28 5,922.28 281.90 405.60 2,544,825.30 263,816.76 0.81 240.95 6,093.00 8.55 62.00 6,070.06 5,942.06 283.30 408.23 2,544,826.65 263,819.42 0.30 242.71 6,113.00 8.45 62.00 6,089.84 5,961.84 284.69 410.84 2,544,827.98 263,822.06 0.50 244.44 6,133.00 8.34 62.00 6,109.63 5,981.63 286.06 413.42 2,544,829.30 263,824.66 0.55 246.16 6,153.00 8.30 62.00 6,129.42 6,001.42 287.41 415.98 2,544,830.61 263,827.24 0.20 247.86 6,173.00 8.16 62.00 6,149.21 6,021.21 288.76 418.50 2,544,831.90 263,829.80 0.70 249.54 6,193.00 8.03 62.00 6,169.01 6,041.01 290.08 420.99 2,544,833.17 263,832.31 0.65 251.20 6,213.00 7.99 61.00 6,188.82 6,060.82 291.41 423.44 2,544,834.45 263,834.79 0.72 252.82 6,233.00 7.89 61.00 6,208.62 6,080.62 292.75 425.86 2,544,835.74 263,837.23 0.50 254.40 6,253.00 7.64 61.00 6,228.44 6,100.44 294.06 428.22 2,544,837.00 263,839.62 1.25 255.95 5/19/2017 10:59:44AM Page 9 COMPASS 5000.1 Build 81 I i Halliburton I-IALLI B U RTO N Standard Proposal Report w Database: ';Sperry EDM-NORTH US+CANADA 'Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: .!''''. GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: l GP 22-13RD3 @ 128.00usft Site: ; v Granite Point Platform North Reference: .°'True Well: .Plan:GP-22-13RD3 Survey Calculation Method: , Minimum Curvature Wellbore:i. Plan:GP 22-13RD3 , Design: GP 22-13RD3 WP05 =gin ._.. �. ... xr�•. .. �,�..-z. ...._ a r:u,,.,..,� Planned Survey Measured Vert cal Map Depth Inclination Azimuth : Depth TVDss +N/-S +E/-W Northing ; , Easting DLS Vert Section usft) ( (°) O ,_ (usft) usft (usft) (usft) (usft) (usft) 6,120.27 , : 6,273.00 7.40 60.00 6,248.27 6,120.27 295.35 430.50 2,544,838.24 263,841.92 1.37 257.43 6,293.00 7.38 60.00 6,268.10 6,140.10 296.63 432.72 2,544,839.48 263,844.18 0.10 258.87 6,313.00 7.25 60.00 6,287.94 6,159.94 297.91 434.93 2,544,840.71 263,846.41 0.65 260.30 6,333.00 6.94 60.00 6,307.79 6,179.79 299.14 437.07 2,544,841.90 263,848.57 1.55 261.68 6,353.00 6.77 58.00 6,327.64 6,199.64 300.37 439.12 2,544,843.09 263,850.64 1.47 262.98 6,373.00 6.78 58.00 6,347.50 6,219.50 301.62 441.12 2,544,844.30 263,852.67 0.05 264.23 6,393.00 6.67 58.00 6,367.37 6,239.37 302.86 443.10 2,544,845.50 263,854.68 0.55 265.47 6,413.00 6.49 57.00 6,387.23 6,259.23 304.09 445.04 2,544,846.69 263,856.64 1.07 266.67 6,433.00 6.44 56.00 6,407.11 6,279.11 305.34 446.91 2,544,847.90 263,858.54 0.62 267.81 6,453.00 6.32 56.00 6,426.98 6,298.98 306.58 448.76 2,544,849.10 263,860.40 0.60 268.92 6,473.00 6.22 56.00 6,446.86 6,318.86 307.80 450.57 2,544,850.29 263,862.24 0.50 270.01 6,493.00 5.95 55.00 6,466.75 6,338.75 309.00 452.31 2,544,851.45 263,864.01 1.45 271.06 6,513.00 5.73 54.00 6,486.65 6,358.65 310.18 453.97 2,544,852.60 263,865.69 1.21 272.03 6,533.00 5.69 54.00 6,506.55 6,378.55 311.35 455.58 2,544,853.74 263,867.33 0.20 272.96 6,553.00 5.64 53.00 6,526.45 6,398.45 312.53 457.17 2,544,854.88 263,868.94 0.55 273.87 6,573.00 5.47 53.00 6,546.36 6,418.36 313.69 458.71 2,544,856.01 263,870.51 0.85 274.75 6,593.00 5.35 52.00 6,566.27 6,438.27 314.84 460.21 2,544,857.13 263,872.02 0.76 275.59 6,613.00 5.23 51.00 6,586.18 6,458.18 315.99 461.65 2,544,858.25 263,873.49 0.76 276.39 6,633.00 5.14 49.00 6,606.10 6,478.10 317.15 463.04 2,544,859.38 263,874.90 1.01 277.12 6,653.00 5.07 49.00 6,626.02 6,498.02 318.32 464.38 2,544,860.52 263,876.26 0.35 277.82 6,656.00 5.18 50.22 6,629.01 6,501.01 318.49 464.58 2,544,860.69 263,876.47 5.16 277.93 , 9 5/8" 6,751.00 9.34 71.72 6,723.24 6,595.24 323.66 475.21 2,544,865.64 263,887.20 5.16 285.21 6,845.00 12.40 75.27 6,815.55 6,687.55 328.62 492.21 2,544,870.25 263,904.30 3.33 298.32 6,940.00 15.00 78.05 6,907.84 6,779.84 333.76 514.11 2,544,874.94 263,926.30 2.82 315.75 7,034.00 17.09 75.81 6,998.17 6,870.17 339.66 539.41 2,544,880.33 263,951.70 2.32 335.89 7,127.00 19.82 79.10 7,086.38 6,958.38 345.99 568.14 2,544,886.08 263,980.56 3.14 358.94 7,220.00 22.08 82.87 7,173.23 7,045.23 351.15 600.97 2,544,890.56 264,013.49 2.83 386.19 7,314.00 23.96 85.84 7,259.75 7,131.75 354.72 637.55 2,544,893.40 264,050.13 2.35 417.49 7,409.00 25.90 86.14 7,345.89 7,217.89 357.52 677.49 2,544,895.38 264,090.12 2.05 452.17 7,502.00 28.00 89.35 7,428.79 7,300.79 359.13 719.59 2,544,896.14 264,132.24 2.75 489.30 7,597.00 30.61 91.52 7,511.63 7,383.63 358.75 766.08 2,544,894.81 264,178.71 2.97 531.25 7,690.00 33.90 92.28 7,590.27 7,462.27 357.09 815.67 2,544,892.14 264,228.26 3.56 576.55 7,783.00 36.62 92.30 7,666.20 7,538.20 354.94 869.31 2,544,888.91 264,281.84 2.92 625.71 7,879.00 40.42 92.38 7,741.29 7,613.29 352.50 929.04 2,544,885.25 264,341.51 3.96 680.46 7,974.00 42.53 93.07 7,812.47 7,684.47 349.50 991.88 2,544,880.98 264,404.27 2.27 738.25 8,070.00 45.23 92.27 7,881.66 7,753.66 346.41 1,058.35 2,544,876.54 264,470.66 2.87 799.34 8,165.00 48.14 92.52 7,946.82 7,818.82 343.52 1,127.40 2,544,872.25 264,539.63 3.07 862.67 8,260.00 50.50 91.41 8,008.74 7,880.74 341.06 1,199.39 2,544,868.33 264,611.56 2.64 928.46 8,355.00 52.75 91.13 8,067.72 7,939.72 339.41 1,273.85 2,544,865.17 264,685.96 2.38 996.10 8,450.00 53.71 92.27 8,124.58 7,996.58 337.15 1,349.91 2,544,861.36 264,761.96 1.39 1,065.45 8,500.00 54.27 92.58 8,153.98 8,025.98 335.44 1,390.32 2,544,858.83 264,802.33 1.23 1,102.52 Start Dir 12.3°/100':8500'MD,8153.98'TVD:60°RT TF-7" 5/19/2017 10:59:44AM Page 10 COMPASS 5000.1 Build 81 • 11110 Halliburton HALLIBURTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA ( Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC p ® r : GP 22-13RD3 @ 128.00usft Project: Granite Point a = GP 22-13RD3©128.00usft Site: Granite Point Platform wTrue Well: Plan:GP-22-13RD3 Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 -k '� ,_ l Planned Survey M. Measured Vertical Ma Map § Depth Inclination Azimuth - Depth TVDss +N/-S +EI-W Northing " Easting r Vert Section (usft) (°) (°) (usft) usft ,(IYaft._ -.(usft) (usft) , ' ' (usft) ;,:'';::&,'-'1.,i'' 8,517.08 55.33 94.81 8,163.82 8,035.82 334.54 1,404.25 2,544,857.65 264,816.23 12.31 1,115.43 End Dir :8517.08'MD,8163.82'TVD 8,537.08 55.33 94.81 8,175.20 8,047.20 333.16 1,420.64 2,544,855.94 264,832.59 0.00 1,130.77 Start Dir 6°/100':8537.08'MD,8175.2'TVD 8,550.00 54.73 95.41 8,182.61 8,054.61 332.22 1,431.18 2,544,854.78 264,843.11 6.00 1,140.66 8,600.00 52.45 97.83 8,212.29 8,084.29 327.59 1,471.15 2,544,849.34 264,882.97 6.00 1,178.61 8,650.00 50.22 100.41 8,243.53 8,115.53 321.42 1,509.69 2,544,842.39 264,921.38 6.00 1,215.95 8,700.00 48.05 103.15 8,276.24 8,148.24 313.72 1,546.70 2,544,833.94 264,958.23 6.00 1,252.59 8,750.00 45.95 106.08 8,310.34 8,182.34 304.51 1,582.08 2,544,824.01 264,993.41 6.00 1,288.43 8,800.00 43.94 109.23 8,345.74 8,217.74 293.82 1,615.73 2,544,812.64 265,026.84 6.00 1,323.36 8,850.00 42.01 112.60 8,382.32 8,254.32 281.67 1,647.56 2,544,799.85 265,058.42 6.00 1,357.30 8,900.00 40.19 116.23 8,420.00 8,292.00 268.11 1,677.49 2,544,785.68 265,088.06 6.00 1,390.14 8,950.00 38.50 120.14 8,458.67 8,330.67 253.16 1,705.43 2,544,770.17 265,115.69 6.00 1,421.81 9,000.00 36.94 124.33 8,498.23 8,370.23 236.87 1,731.30 2,544,753.36 265,141.22 6.00 1,452.20 9,050.00 35.54 128.82 8,538.56 8,410.56 219.28 1,755.04 2,544,735.29 265,164.59 6.00 1,481.24 9,100.00 34.32 133.61 8,579.56 8,451.56 200.44 1,776.57 2,544,716.02 265,185.74 6.00 1,508.86 9,150.00 33.30 138.68 8,621.11 8,493.11 180.41 1,795.84 2,544,695.60 265,204.60 6.00 1,534.96 9,200.00 32.49 144.00 8,663.11 8,535.11 159.23 1,812.80 2,544,674.08 265,221.13 6.00 1,559.49 9,205.73 32.41 144.62 8,667.94 8,539.94 156.73 1,814.60 2,544,671.55 265,222.87 6.00 1,562.20 End Dir :9218.66'MD,8678.87'ND 9,218.66 32.25 146.04 8,678.87 8,550.87 151.05 1,818.53 2,544,665.78 265,226.69 6.00 1,568.22 9,300.00 32.25 146.04 8,747.66 8,619.66 115.05 1,842.77 2,544,629.30 265,250.19 0.00 1,605.80 9,400.00 32.25 146.04 8,832.23 8,704.23 70.79 1,872.58 2,544,584.44 265,279.09 0.00 1,651.99 9,500.00 32.25 146.04 8,916.80 8,788.80 26.53 1,902.39 2,544,539.59 265,307.99 0.00 1,698.18 9,600.00 32.25 146.04 9,001.38 8,873.38 -17.73 1,932.19 2,544,494.73 265,336.89 0.00 1,744.38 9,700.00 32.25 146.04 9,085.95 8,957.95 -62.00 1,962.00 2,544,449.88 265,365.79 0.00 1,790.57 9,726.07 32.25 146.04 9,108.00 8,980.00 -73.53 1,969.77 2,544,438.19 265,373.33 0.00 1,802.61 C2 9,800.00 32.25 146.04 9,170.52 9,042.52 -106.26 1,991.81 2,544,405.02 265,394.69 0.00 1,836.77 9,900.00 32.25 146.04 9,255.10 9,127.10 -150.52 2,021.61 2,544,360.17 265,423.59 0.00 1,882.96 10,000.00 32.25 146.04 9,339.67 9,211.67 -194.78 2,051.42 2,544,315.31 265,452.49 0.00 1,929.15 10,100.00 32.25 146.04 9,424.24 9,296.24 -239.04 2,081.22 2,544,270.46 265,481.39 0.00 1,975.35 10,200.00 32.25 146.04 9,508.82 9,380.82 -283.30 2,111.03 2,544,225.61 265,510.30 0.00 2,021.54 10,222.68 32.25 146.04 9,528.00 9,400.00 -293.34 2,117.79 2,544,215.43 265,516.85 0.00 2,032.02 C5 10,300.00 32.25 146.04 9,593.39 9,465.39 -327.56 2,140.84 2,544,180.75 265,539.20 0.00 2,067.73 10,400.00 32.25 146.04 9,677.96 9,549.96 -371.82 2,170.64 2,544,135.90 265,568.10 0.00 2,113.93 10,494.64 32.25 146.04 9,758.00 9,630.00 -413.70 2,198.85 2,544,093.45 265,595.45 0.00 2,157.64 C6 10,500.00 32.25 146.04 9,762.54 9,634.54 -416.08 2,200.45 2,544,091.04 265,597.00 0.00 2,160.12 10,566.35 32.25 146.04 9,818.65 9,690.65 -445.44 2,220.23 2,544,061.28 265,616.17 0.00 2,190.77 Start Dir 6°/100':10572.53'MD,9823.88'TVD 10,572.53 32.25 146.04 9,823.88 9,695.88 -448.18 2,222.07 2,544,058.51 265,617.96 0.00 2,193.62 10,600.00 33.64 144.42 9,846.93 9,718.93 -460.45 2,230.59 2,544,046.07 265,626.23 6.00 2,206.66 10,650.00 36.22 141.75 9,887.92 9,759.92 -483.32 2,247.80 2,544,022.85 265,642.97 6.00 2,232.15 5/19/2017 10:59:44AM Page 11 COMPASS 5000.1 Build 81 s Halliburton HALLIBURTON Standard Proposal Report Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: ilk GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: GP 22-13RD3 @ 128.00usft Site: Granite Point Platform North Reference: True Well: Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W .: Northing ''"' Easting DLS Vert Section (usft) () (°) (usft) usft '. (usft) (usft) (usft) (usft) 9,799.56 10,700.00 38.86 139.40 9,927.56 9,799.56 -506.84 2,267.16 2,543,998.95 265,661.84 6.00 2,259.86 10,750.00 41.54 137.30 9,965.75 9,837.75 -530.93 2,288.61 2,543,974.42 265,682.80 6.00 2,289.71 10,800.00 44.25 135.41 10,002.38 9,874.38 -555.54 2,312.11 2,543,949.34 265,705.79 6.00 2,321.62 10,850.00 46.99 133.70 10,037.35 9,909.35 -580.60 2,337.57 2,543,923.77 265,730.74 6.00 2,355.49 10,900.00 49.75 132.14 10,070.57 9,942.57 -606.04 2,364.95 2,543,897.78 265,757.59 6.00 2,391.24 10,950.00 52.53 130.69 10,101.94 9,973.94 -631.78 2,394.15 2,543,871.45 265,786.26 6.00 2,428.78 10,994.10 55.00 129.51 10,128.00 10,000.00 -654.69 2,421.35 2,543,848.00 265,813.00 6.00 2,463.27 C7 11,000.00 55.35 129.51 10,131.37 10,003.37 -657.77 2,425.09 2,543,844.84 265,816.67 6.00 2,467.98 11,050.00 58.35 129.51 10,158.71 10,030.71 -684.40 2,457.39 2,543,817.56 265,848.42 6.00 2,508.69 11,100.00 61.35 129.51 10,183.81 10,055.81 -711.91 2,490.74 2,543,789.39 265,881.21 6.00 2,550.72 11,150.00 64.35 129.51 10,206.62 10,078.62 -740.21 2,525.06 2,543,760.39 265,914.95 6.00 2,593.98 11,200.00 67.35 129.51 10,227.07 10,099.07 -769.24 2,560.26 2,543,730.66 265,949.54 6.00 2,638.34 11,224.65 68.83 129.51 10,236.27 10,108.27 -783.79 2,577.90 2,543,715.75 265,966.89 6.00 2,660.57 End Dir :11238.07'MD,10241.03'TVD 11,238.07 69.64 129.51 10,241.03 10,113.03 -791.77 2,587.58 2,543,707.58 265,976.40 6.00 2,672.77 11,300.00 69.64 129.51 10,262.58 10,134.58 -828.71 2,632.38 2,543,669.73 266,020.44 0.00 2,729.23 11,400.00 69.64 129.51 10,297.37 10,169.37 -888.36 2,704.71 2,543,608.63 266,091.54 0.00 2,820.39 11,500.00 69.64 129.51 10,332.17 10,204.17 -948.01 2,777.04 2,543,547.53 266,162.64 0.00 2,911.54 11,600.00 69.64 129.51 10,366.96 10,238.96 -1,007.65 2,849.36 2,543,486.43 266,233.74 0.00 3,002.70 11,700.00 69.64 129.51 10,401.76 10,273.76 -1,067.30 2,921.69 2,543,425.32 266,304.84 0.00 3,093.86 11,800.00 69.64 129.51 10,436.55 10,308.55 -1,126.95 2,994.02 2,543,364.22 266,375.94 0.00 3,185.02 11,900.00 69.64 129.51 10,471.34 10,343.34 -1,186.60 3,066.35 2,543,303.12 266,447.04 0.00 3,276.17 12,000.00 69.64 129.51 10,506.14 10,378.14 -1,246.24 3,138.68 2,543,242.02 266,518.14 0.00 3,367.33 12,100.00 69.64 129.51 10,540.93 10,412.93 -1,305.89 3,211.01 2,543,180.92 266,589.24 0.00 3,458.49 12,200.00 69.64 129.51 10,575.73 10,447.73 -1,365.54 3,283.34 2,543,119.81 266,660.34 0.00 3,549.65 12,300.00 69.64 129.51 10,610.52 10,482.52 -1,425.19 3,355.67 2,543,058.71 266,731.44 0.00 3,640.81 12,400.00 69.64 129.51 10,645.32 10,517.32 -1,484.83 3,428.00 2,542,997.61 266,802.54 0.00 3,731.96 12,500.00 69.64 129.51 10,680.11 10,552.11 -1,544.48 3,500.32 2,542,936.51 266,873.64 0.00 3,823.12 12,600.00 69.64 129.51 10,714.91 10,586.91 -1,604.13 3,572.65 2,542,875.40 266,944.74 0.00 3,914.28 12,700.00 69.64 129.51 10,749.70 10,621.70 -1,663.78 3,644.98 2,542,814.30 267,015.84 0.00 4,005.44 12,800.00 69.64 129.51 10,784.50 10,656.50 -1,723.43 3,717.31 2,542,753.20 267,086.94 0.00 4,096.59 12,900.00 69.64 129.51 10,819.29 10,691.29 -1,783.07 3,789.64 2,542,692.10 267,158.04 0.00 4,187.75 13,000.00 69.64 129.51 10,854.09 10,726.09 -1,842.72 3,861.97 2,542,630.99 267,229.14 0.00 4,278.91 13,068.73 69.64 129.51 10,878.00 10,750.00 -1,883.72 3,911.68 2,542,589.00 267,278.00 0.00 4,341.56 13,100.00 69.64 129.51 10,888.88 10,760.88 -1,902.37 3,934.30 2,542,569.89 267,300.23 0.00 4,370.07 13,168.73 69.64 129.51 10,912.79 10,784.79 -1,943.36 3,984.01 2,542,527.90 267,349.10 0.00 4,432.72 Total Depth:13168.73'MD,10912.79'WD 5/19/2017 10:59:44AM Page 12 COMPASS 5000.1 Build 81 I • Halliburton Standard Proposal Report I-IALLIBURTON Database: Sperry EDM-NORTH US+CANADA Local Co-ordinate Reference: ti.r.1 Well Plan:GP-22-13RD3 Company: Hilcorp Alaska,LLC TVD Reference: GP 22-13RD3 @ 128.00usft Project: Granite Point MD Reference: GP 22-13RD3 @ 128.O0usft Site: Granite Point Platform North Reference: True Well Plan:GP-22-13RD3 Survey Calculation Method: Minimum Curvature Wellbore: Plan:GP 22-13RD3 Design: GP 22-13RD3 WP05 z Targets Target Name "� hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting Shape (1 (°) , (usft) ,, (usft) .} (usft) (usft) .: (usft) GP 22-13RD3 C7 Tgt 0.00 0.00 10,128.00 -654.69 2,421.35 2,543,848.00 265,813.00 -plan hits target center -Circle(radius 100.00) GP 22-13RD3 TD Tgt 0.00 0.00 10,878.00 -1,883.72 3,911.68 2,542,589.00 267,278.00 -plan hits target center -Circle(radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Wit Diameter Diameter .Y4 (usft) (usft) s A ,,.. (in) (in) 13,168.73 10,912.80 41/2" 4.500 6.000 8,500.01 8,153.98 7" 7.000 8.500 r,w Formations ... . „_ r. .,.,.,-... - ' fix. •r' - �, u. �', Measured Vertical VerticalIP Dip Depth Depth Depth SS , Direction (usft) (usft) ; .x. .... (°) 9,726.07 9,108.00 C2 0.00 10,994.10 10,128.00 C7 0.00 10,494.64 9,758.00 C6 0.00 10,222.68 9,528.00 C5 0.00 Plan Annotations _, Measured Vertical Local Coordinates 45 _ } Depth ' '.Depth +N/-5 +E/-W%* (usft) ,(usft) (usft) (usft) Comment 8,500.00 8,153.98 335.44 1,390.32 StartDir 12.3°/100':8500'MD,8153.98'TVD:60°RT TF 8,517.08 8,163.82 334.54 1,404.25 End Dir :8517.08'MD,8163.82'TVD 8,537.08 8,175.20 333.16 1,420.64 6°/100':8537.08'MD,8175.2'TVD 9,205.73 8,667.94 156.73 1,814.60 StartEnd DirDir:9218.66'MD,8678.87'TVD 10,566.35 9,818.65 -445.44 2, 6°/100':10572.53'MD,9823.88'TVD 11,224.65 10,236.27 -783.79 2,220.23577.90 StartEnd DirDir:11238.07'MD,10241.03'TVD 13,168.73 10,912.79 -1,943.36 3,984.01 Total Depth:13168.73'MD,10912.79'TVD 5/19/2017 10:59:44AM Page 13 COMPASS 5000.1 Build 81 • • Hilcorp Alaska, LLC Granite Point Granite Point Platform Plan: GP-22-13RD3 Plan: GP 22-13RD3 GP 22-13RD3 WP05 Sperry Drilling Services Clearance Summary Anticollision Report 18 May,2017 Closest Approach 3D Proximity Scan on Current Survey Data(North Reference) Reference Design: Granite Point Platform•Plan:GP-22-13RD3-Plan:GP 22-13RD3-GP 22-13RD3 WP05 Well Coordinates: 2,544,551.71 N,263,405.53 E(60'57'29.33"N,151'19'52.27"W) Datum Height:GP 22-13RD3 @ 128.00usft Scan Range: 8,500.00 to 13,168.73 usft.Measured Depth. Scan Radius Is 1,516.87 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build:81 Scan Type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Scan Type: 25.00 HALLIBURTON Sperry Drilling Services • I Hilcorp Alaska,LLC HALLI B U RTO N Granite Point Anticollision Report for Plan: GP-22-13RD3-GP 22-13RD3 WP05 Closest Approach 3D Proximity Scan on Current Survey Data(North Reference) Reference Design: Granite Point Platform-Plan:GP-22-13RD3-Plan:GP 22-13RD3-GP 22-13RD3 WP05 Scan Range: 8,500.00 to 13,168.73 usft.Measured Depth. Scan Radius is 1,516.87 usft.Clearance Factor cutoff is Unlimited.Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft Granite Point Platform GP-31-13-GP-31-13-GP-31-13 8,500.00 1,011.84 8,500.00 635.32 8,236.70 2.687 Centre Distance Pass- GP-31-13-GP-31-13-GP-31-13 8,550.00 1,013.74 8,550.00 633.35 8,262.92 2.665 Ellipse Separation Pass- GP-31-13-GP-31-13-GP-31-13 8,675.00 1,032.59 8,675.00 642.33 8,342.29 2.646 Clearance Factor Pass- GP-32-13RD-GP-32-13-GP-32-13 8,775.00 384.94 8,775.00 215.43 8,500.59 2.271 Clearance Factor Pass- GP-32-13RD-GP-32-13-GP-32-13 9,350.00 325.34 9,350.00 197.78 9,009.02 2.550 Ellipse Separation Pass- GP-32.13RD-GP-32-13-GP-32-13 9,525.98 313.20 9,525.98 209.12 9,157.41 3,009 Centre Distance Pass- GP-32-13RD-GP-32-13RD-GP-32-13RD 10,250.00 202.72 10,250.00 37.04 9,879.11 1.224 Clearance Factor Pass- GP-32-13RD-GP-32.13RD-GP-32-13RD 10,297.02 201.48 10,297.02 38.47 9,919.77 1.236 Centre Distance Pass- GP-32-13RD-GP-32-13RD PB1-GP-32-13RD PB1 11111111110.40 lall - ` motor GP-32-13RD-GP-32-13RD PB1-GP-32-13RD PB1 IIIIIIx1.51 - - - Illi,. GP-32-13RD-GP-33-13-GP-33-13 10,225.00 792.11 10,225.00 600.16 9,723.97 4.127 Clearance Factor Pass- GP-32-13RD-GP-33-13-GP-33-13 10,425.00 778.35 10,425.00 592.63 9,886.75 4.191 Ellipse Separation Pass- GP32-13RD-GP-33-13-GP-33-13 10,505.68 776.93 10,505.68 594.52 9,948.57 4.259 Centre Distance Pass- GP-33-13**-GP-33-13-GP-33-13 10,475.00 774.94 10,475.00 336.82 9,925.53 1.769 Clearance Factor Pass- GP-33-13"-GP-33-13-GP-33-13 10,500.00 774.68 10,500.00 336.81 9,944.31 1.769 Ellipse Separation Pass- GP-33-13"-GP-33-13-GP-33-13 10,511.50 774.65 10,511.50 336.90 9,952.93 1.770 Centre Distance Pass- Plan:GP-22-13RD3-GP-22-13-GP-22-13 8,500.00 888.43 8,500.00 885.59 8,142.95 313.419 Ellipse Separation Pass- Plan:GP-22-13RD3-GP-22-13-GP-22-13 8,525.00 909.17 8,525.00 904.98 8,156.05 216.845 Clearance Factor Pass- Plan:GP-22-13RD3-GP-22-13RD-GP-22-13RD 8,800.00 45.47 8,800.00 40.43 8,780.79 9.017 Clearance Factor Pass- Plan:GP-22-13RD3-GP-22-13RD PB1-GP-22-13RD 8,800.00 45.47 8,800.00 40.33 8,780.79 8.834 Clearance Factor Pass- Plan:GP-22-13RD3-GP-22-13R02-GP-22-13RD2 8,800.00 45.47 8,800.00 40.33 8,780.79 8.834 Clearance Factor Pass- 18 May,2017-10.:07 Page 2 of 5 COMPASS • Hilcorp Alaska,LLC HALLI B U RTO N Granite Point Anticollision Report for Plan: GP-22-13RD3 -GP 22-13RD3 WP05 Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 33.00 5,713.00 NSG_WL 5,733.00 6,653.00 NSG_WL 6,751.00 8,500.00 MWD 8,500.00 13,168.73 GP 22-13RD3 WP05 MWD+SC+sag Ellipse error terms are correlated across survey tool tie-on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor=Distance Between Profiles/(Distance Between Profiles-Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 18 May,2017-19:07 Page 3 of5 COMPASS • • Hilcorp Alaska,LLC HALLIBURTON Granite Point Anticollision Report for Plan: GP-22-13RD3 -GP 22-13RD3 WP05 Direction and Coordinates are relative to True North Reference. Vertical Depths are relative to GP 22-13RD3 @ 128.00usft. Northing and Easting are relative to Plan:GP-22-13RD3. Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04. Central Meridian is-150,00°,Grid Convergence at Surface is:-1.10°. taP-14-1,5RU,t,P-24-1J,1*F'-14-Ti VU Ladder Plot GP-24-13RD,GP-24-13RD,GP-24-13RD VO GP-31-13,GP-31-13,GP-31-13 V0 GP31-14RD2,GP31-14,GP-31-14 VO -r r -r i 1 GP31-14RD2,GP31-14RD,GP31-14RD V0 /,I GP31-31 -14RD2,GP-31-14RD2VO y 13 I i I I i '/`'I GP-31-23,GP-31-23,GP-31-23V0 c t(41111 GP32-32 -13,GP32-13VU LC) GP32-13RD,GP32-13RD,GP-32-13RDVO Act ----�- GP32-13RD,GP-32-13RDPB1,GP32-13RDPB1 VO 13,GP-33-13 ' GP32-23,GP32-23 GP32-3VOCO V0 90/ �WGP33-13",GP33-13,GP33-13V0 aCL ) 1 / [ GP33-33 -14,GP33-14V0 Cl) GP-33-14RD,GP-33-14RD,GP-33-14RDVO • fM GP3323 ,GP-33-23,GP-3323 V0 C GP112-23,GP-42-23,GP-02-23 V0 a) U / GP-42-23,GP-42-23RD,GP-42-23RDVO Q 4 i i fly r I I i 23s: GP-44-11,G P-4-11,GP-44-11 VO I E.i 0 1 II i GP-4-14,GP-0414,GP-44-14V0 i ` � GP-50,GP-50,GP-50VO a)U I I i_+ GP51,GP51,GP51 VO I I GP-52,GP-52,GP52 V0 GP-53 LT GP-53LT,GP-53LTVO 0 2500 5000 7500 10000 12500 GP53LT,GP-53PLOT,GP-53PILOTVO Measured Depth(2500 usft/in) GP-54,GP-54,GP-54V0 GP54.GP54PB1,GP-54PBIVU 18 May,2017-19:07 Page 4 of 5 COMPASS • • Hilcorp Alaska,LLC HALLIBURTON Granite Point Anticollision Report for Plan: GP-22-13RD3 -GP 22-13RD3 WP05 Clearance Factor Plot: Measured Depth versus Separation(Clearance)Factor $GP-24-13RD,GP-24-13,GP-24-13V0 -E-GP-24-13RD,GP-24-13RD,GP-24-13RDVO 10.00- ___. ____ __-- �...__.. ____. ___.. ............. r .....__. -__.. ..._ $GP31-13,GP31-13,GP-31-13V0 _ '.. -$-GP-31-14RD2,GP-31-14,GP.31-14 V0 _...... 44-GP31-14RD2,GP-31-14RD,GP-31-14RDVO 8.75— _ ._._ --- ---- 1 ...... _.- .._l.. .....- -- -.GP-31-14RD2,GP-31-14RD2,GP-31-14RD2VO ♦-GP31-23,GP-31-23,GP31-23V0 _......... _... _ ._ $GP-32-13RD,GP-32-13,GP-32-13V0 -I-GP-32-13RD,GP32-13RD,GP-32-13RDVO -9-GP-32-13RD,GP-32-13RDPB1,GP-32-13RD PB1 VO s25 --- ---......... __..... _--......._ ....__. _........ ........... ----..._.._ r - $GP32-13RD,GP-33-13,GP�3-13 V0 $ -...... �.i - -sir GP32-23,GP-32-23,GP32-23V0 03 - - ♦-GP-33-13",GP-33-13,GP-33-13V0 a _..... ......... -$GP33-14RD,GP-33-14,GP-33-14V0 c500- ......_ .......---- -__.._..._... -....- -. $GP-33-14RD,GP33-14RD,GP-33-14RDVO o. _ $GP33-23",GP33-23,GP-33-23V0 rn3.75- ...... ---_............ -......_.---- ........ ----- ._............ _. ..... __._ _._._..... ....._..... $GP-42-23,GP-42-23,GP-42-23V0 $GP-02-23,GP-42-23RD,GP-02-23RD V0 i ♦-GP-44-11,GP-4-11,GP-44-11 VO 2.50- "°'a4i $GP-0414,GP4414,GP-4414V0 Collision Avoidance Req -e-GP-50,GP-50,GP-50V0 —No-Go ZOne-Stop Drilling —}-GP51,GP51,GP51V0 44-GP-52,GP-52,GP-52V0 �-N-GP-53 LT,GP-53 LT,GP-53LTVO 0.00 , , , , , , , , , , , „ , , , , , , , -4-GP-53LT,GP-53 PILOT,GP-53 PILOTVO 0 1250 2500 3750 5000 6250 7500 8750 10000 11250 12500 13750 15000 $GP-54,GP-54,GP-54V0 MeasuedDepth(2530tsttfn) ♦-GP54,GP54PB1,GP-54PB1VO 18 May,2017-19:07 Pogo Sof5 COMPASS • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 333 West 7th Avenue Anchorage,Alaska 99501 Re:THE APPLICATION OF Hilcorp Alaska, ) Docket No. CO 17-013 LLC to drill and complete the Granite Point ) Conservation Order No. 76.34 State 22-13RD3 development oil well within ) 1,000 feet of, and within the same ) Granite Point State 22-13RD3 governmental quarter section as, wells that ) Granite Point Unit are, or may be capable of,producing from the ) Granite Point Field same pool. ) Middle Kenai Oil Pool ) July 11, 2017 IT APPEARING THAT: By a letter received June 21, 2017,Hilcorp Alaska,LLC (Hilcorp)requests an order allowing drilling and completion of the Granite Point State 22-13RD3 development oil well within 1,000 feet of and within the same governmental quarter section as wells that are or may be capable of producing from the same pool. FINDINGS: 1. Hilcorp is the operator of the Granite Point Field,Granite Point Unit and the proposed Granite Point State (GPS) 22-13RD3 development oil well to be located on the west side of the Cook Inlet,Kenai Peninsula Borough,Alaska. 2. The GPS 22-13RD3 well will be an offshore, deviated development oil well with a surface location of 2,383 feet from the north line and 1,371 feet from the west line of Section 13, Township 10 North, Range 12 West, Seward Meridian (S.M.). The top of the Middle Kenai producing interval location is 2,412 feet from the north line and 1,995 feet from the east line of Section 13, Township 10 North, Range 12 West, S.M. The bottom hole location is 958 feet from the south line and 75 feet from the west line of Section 18,Township 10 North,Range 12 West, S.M. 3. GPS 22-13RD3 well will be located entirely within State of Alaska Oil and Gas Lease ADL 18761. 4. GPS 22-13RD3 well will be completed within the Middle Kenai Oil Pool within an area governed by Conservation Order No. 76. 5. GPS 22-13RD3 will be the second well capable of producing from the Middle Kenai Oil Pool within the southeast quarter of Section 13 and southwest quarter of Section 18. 6. GPS 22-13RD3 will be the third well within the northeast quarter of Section 13 capable of producing from the Middle Kenai Oil Pool. 7. GPS 22-13RD3 will be within 1,000 feet to the GPS 32-13RD development well that produces from the Middle Kenai Oil Pool. 8. Conservation Order 76,Rule 2. Spacing provides a. not more than two completed wells shall be allowed in any governmental quarter section; and b. no pay opened to the well bore shall be nearer than 500 feet to any property line nor nearer than 1,000 feet to any well drilling to or capable of producing from the same pool. 9. Conservation Order 76, Rule 7. Administrative Approval specifies in part that the Alaska Oil and Gas Conservation Commission (AOGCC) "...may authorize the conversion or drilling of any well at any location...reasonably designed to further the purposes of the project." 111110 • CO 76.34 July 11,2017 Page 2 of 2 10. The drilling and completion of GPS 22-13RD3 is designed to maximize recovery from the Middle Kenai Oil Pool at Granite Point Field by accessing un-drained reserves in oil reservoirs that cannot be reached by wells conforming to applicable spacing restrictions. 11. In conformance to Rule 7 of Conservation Order No. 76,Hilcorp gave notice of this request to all potentially affected landowners, owners and operators within 1,000-foot radius of the GPS 22-13RD3 well: the State of Alaska, Department of Natural Resources (DNR) and Hilcorp Alaska, LLC. On June 19, 2017, Hilcorp sent notice of its application to the DNR. The AOGCC received no objection or comment regarding Hilcorp's request. CONCLUSIONS: 1. An exception to the well spacing provisions of Rule 2, CO 76 is necessary to allow drilling, completion,and production of the GPS 22-13RD3 development oil well to maximize recovery of reserves. 2. A spacing exception to allow drilling, completion, and production of the GPS 22-13RD3 development oil well is consistent with sound engineering and geoscience principles and will not result in waste or jeopardize correlative rights of adjoining or nearby owners. NOW THEREFORE IT IS ORDERED: Hilcorp's June 19,2017 application for an order granting an exception to the well spacing requirements of 20 AAC 25.055(a)(3) to allow drilling, completion, and production of the GPS 22-13RD3 development oil well is approved. Hilcorp may proceed as long as it complies with the terms of the Granite Point Unit agreement, applicable Alaska laws, and all other legal requirements. DONE at Anchorage,Alaska and dated July 11, 2017. 4.p,OIL gn,. ' a //signature on file// //signature on file// //signature on file// Hollis French Daniel T. Seamount,Jr. CathyP. Foerster o ��t o Chair, Commissioner Commissioner Commissioner `��R` - `21roN CO RECONSIDERATION AND APPEAL NOTICE As provided in AS 31.05.080(a),within 20 days after written notice of the entry of this order or decision,or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration of the matter determined by it. If the notice was mailed,then the period of time shall be 23 days. An application for reconsideration must set out the respect in which the order or decision is believed to be erroneous. The AOGCC shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed. Failure to act on it within 10-days is a denial of reconsideration. If the AOGCC denies reconsideration,upon denial,this order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST be filed within 33 days after the date on which the AOGCC mails,OR 30 days if the AOGCC otherwise distributes,the order or decision denying reconsideration,UNLESS the denial is by inaction,in which case the appeal MUST be filed within 40 days after the date on which the application for reconsideration was filed. If the AOGCC grants an application for reconsideration, this order or decision does not become final. Rather, the order or decision on reconsideration will be the FINAL order or decision of the AOGCC,and it may be appealed to superior court. That appeal MUST be filed within 33 days after the date on which the AOGCC mails,OR 30 days if the AOGCC otherwise distributes,the order or decision on reconsideration. As provided in AS 31.05.080(6),"[t]he questions reviewed on appeal are limited to the questions presented to the AOGCC by the application for reconsideration." In computing a period of time above,the date of the event or default after which the designated period begins to run is not included in the period; the last day of the period is included,unless it falls on a weekend or state holiday,in which event the period runs until 5:00 p.m.on the next day that does not fall on a weekend or state holiday. • • Bettis, Patricia K (DOA) From: Bettis, Patricia K(DOA) Sent: Friday,June 9, 2017 3:43 PM To: Monty Myers (mmyers@hilcorp.com) Subject: Granite Pt ST 22-13RD3 (PTD 217-086): Permit to Drill Application Good afternoon Monty, The Granite Point, Middle Kenai Oil Pool is governed by Conservation Order 76. Rule 2 of that order states: a. Not more than two completed wells shall be allowed in any governmental quarter section;and b. No pay opened to the wellbore shall be nearer than 500 feet to any property line nor nearer than 1,000 feet to any well drilling to or capable of producing from the same pool. It appears that the proposed 22-13RD3 will be within 1,000 feet of Granite Pt ST 32-13RD which is a Middle Kenai Oil producer. If that is correct, Hilcorp needs to apply for a well exception under 20 AAC 25.055(d). Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Ste 100 Anchorage,AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • Bettis, Patricia K (DOA) From: Monty Myers <mmyers@hilcorp.com> Sent: Thursday,June 8, 2017 2:13 PM To: Bettis, Patricia K (DOA) Subject: RE: Granite PT St 22-13RD3 The correct number is 115' above MSL Monty M Myers Drilling Engineer Hilcorp Alaska Office: 907.777.8431 Cell: 907.538.1168 From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent:Thursday,June 08, 2017 2:11 PM To: Monty Myers<mmyers@hilcorp.com> Subject:Granite PT St 22-13RD3 Good afternoon Monty, On Form 10-401, Box 10, it is stated that the KB is 115'above MSL. On the Halliburton Standard Proposal Report,the KB is listed as 128 '. Please verify the correct KB elevation. Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Ste 100 Anchorage, AK 99501 Tel: (907)793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • TRANSMITTAL LETTER CHECKLIST WELL NAME: Gittiiitt. ? 4- 13 Al 3 PTD: 27'0% Development _Service _Exploratory Stratigraphic Test Non-Conventional FIELD: 6f0111 T1. !O i J POOL: Gin l k 4 A/, I1J4 f i &i ' Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. Revised 2/2015 • 0 0 7,5 , , , , , a : , , , , , , , , , , c' y, v, , -▪ c Co .c o c c, , o, mo o ai E O C. 3' E' a , 0 , , , , , , O; 4 O' E, ,,co' ai -o U, 3, o. m a. 3 O, - 3' , 4 .LO Q, �, o Tr x a p, a. , a. w 4 ' m U. a)' a) c as > a [Y. c. c. a.. , �, 0, a) EN � -o01 3. , Q. ' E, �' d'� a N O: O. , a , N , a 0, N a O :' C‘ 0O , o a w , aI- -0 Y'. (c0; 'n 2 0 0 3, `� , o, 3' � ° 3 cNI N N ("I g N M M C, - OS, , 'C, O, n, O, , N, N � 0/ N y. • Q -, d, „ 0' g, �, CO N c' a ca E, 3, w' , 2, $ �' a>. W. �, E (9 �' a, u l �, �, �: N, ai, �, �, o, y v axi �, a, E' v' ZOo CNI' N• N C, us >w a. o) Y O c Omo, , E ).� Z 2. a 0 , c, Q. UUr bn c 0c C, N N co •0 N (0 N O C0 a)a. y Z 0 a Na, CL o' ' co O _ pca ' 0) , 41) Oa a) ' � (N Nx' ' o > w Q, O O 5 O O o ' U Up , U U , >- � >, co , > , c•.), I ' I. w, ' V, , , , , , , o , , , , , , , `"J'' N. N, N. N. N, N. U) Nr N, (2; 2', U) N, N. N. N. N, N. Q Q 0). 0), a). a), 0, 0 N, O N. O, 0, O, Q. Q. Q. Q Q. Q; Q; a). Q, 4), 0), O, Q, O, 0). a). N. N, O, Q, 0, a). Q, Q ¢, S_, Z, Z, > > Z, Z, > Z, Z, >- z, Z, Z, Z, Z, Z, Z, z, r >-, Z, >- > } Z, Z, Z, Z, Z, Z, y a , , , , , , , , , a)—��--+- m J ' 0 , , N. 0 „ - EC.. 3. , , , , , , , E , , , , , , , , , , ' N, O, p, u T , . F) .o , C U O C C' O _5 c? O, Z, �� N, N 0). N, 1w` Q Q' R O' 0) N' 0) � , a), ' E ' , ' ' y� 'o , ' CU , , , 1 � ' , CO. a0c' O N0 c ] , Ncn N' a . , o 3, , ca ,o 0) ,C, , g , .' C . O. mva u ' rv a4 o Cp Oy F- oS f • a 0) - , ' 0, _' (M 0Qin' ay aa '0 8 c, - , 0ocO (0, N , DOC, 0) m ' 0 0 0) y. ' a' L. . cC' y' o oCY wF- M 'm. N. E' Inm, >, w, CC, > a. 4 �, a, w, ONL0EE - O C {0, 2 O, co, c 22C• U• O . ' c , Vy 0 N3 $ N : p,idj c-I .NZ Q , N CI ( NaN O' OC C) C '= V, aN � f, •O �aCLN , > ' � CO O 7 C 0 O ; p' p E, � Q � N, T O' p) pviC J ,' O � y , ' . ooa) cCd0 `, -, fc, , � E. 4 d o . L' m � E 0 N 4 ccamas, .c, L a z, -0 70, , . 0. m. op) a a3O' C o. 3 c E -) Ei, c -o, 0 ..0Na a .0, _a •a, 00 C, a) •L . Ca). NMN, L N� ONO 3 >, 0ao .ri ym 0a) 0 '0N3; 0 o aoo4 • N' oo3 oLU Q o vC , N' v' ; >, o '> � , :.. o 0 vo oNa s o , -0- -0 Z U o pC4=, , 10 > , a) 4 0 a, p, 0) E o a) O� oc, 6 N' - , E' m, E' 0, 0) C. oaN0a '' Np •a0 a) aOC a) Y, NO 'Co0 a) . C *5 0 N a -a 00 42 a) CC a Oa) d -0a) ,- 2, "a Co' E C) U3 N, " hc OO , (0 0Oo0 � NN N ae- Co) 0CO CO 0) O) 0, p NCO • . 2 -C3 W C' •N0L 'O Q 2. 6 m C a` a' f030) • ) .3C , C os 77' NN' N J .= pN 50 o, , Vp -oN, - a) a 0) 0 C N, N >i NN0a) • , vC. c Cr Cr C c CO' , & 0_ •C, , 0 ' p' 0 N, " ' 0 LL_ 0- f �, •0 -0 -0 o, • C0) a .0 - L, y, •NNN, o .0 , La - ' 0 •E p, , m .0c, 03 CE. O a0' m' E, a) a> & Nvp Lc c �a), •3' , co 0 o' � N' � — . o N' m' o5c N, c 00 o a a.) a.) ` -0 c o as N 0 H o � o0 ••3 -cip fn UJ c> �°� a3p(4o 0a =6 mo0 O 'o `aEao .p , o . vrn 2 v 2 rn v;, ai - mai C, o, ao .�, 2, ' caa) )' w, w, =, N' c, �__, co ' mQ ( 0)"' EE 3- a. .6°' 1- F- I- j, � ; a v0 . m > oa) a) *E .-1): 5a) 7 a, a 0, a) a). as, 5. a ; oa. 2 2 m, vas v 'CI. OOL, N' m; m, iad, 4 D o mza05, 5, cw, OOaa0, ac) U), U0U; U ¢ w ¢ =, 0, 0005ga00) u) v' uu I E .- O . N M d• (f) (O CO O) O N M V U) (0 n COO) O N M V' (n (D Cr'). CO O) ^. r r O (N M v In co N. M O N N N N N N N N N N M M M M M M M M M C a) W O l0 O C r O N V _1 N V! N tT O 44' Wo I E a Y 0) a C� —00 Q CO 0 I-- < a w Q ta) < a GP 22-13RD3 50-733-20095-03-00 Granite Point Field Kenai Peninsula Borough, Alaska August 15, 2017 – September 12, 2017 Provided by: Approved by: Corey Ramstad Compiled by: Joshua Dubowski Ralph Winkelman Paul Webster Distribution Date: September 29, 2017 GP 22-13RD3 2 TABLE OF CONTENTS 1 MUDLOGGING EQUIPMENT & CREW .................................................................................................................... 3 1.1 Equipment Summary ..................................................................................................................................... 3 1.2 Crew ............................................................................................................................................................... 3 2 GENERAL WELL DETAILS ........................................................................................................................................ 4 2.1 Well Objectives .............................................................................................................................................. 4 2.2 Hole Data ....................................................................................................................................................... 5 2.3 Daily Activity Summary .................................................................................................................................. 5 3 GEOLOGICAL DATA ................................................................................................................................................ 8 3.1 Lithostratigraphy ........................................................................................................................................... 8 3.2 Lithology Details ............................................................................................................................................ 9 3.3 Sampling Program ........................................................................................................................................ 22 4 DRILLING DATA .................................................................................................................................................... 23 4.1 Surveys ......................................................................................................................................................... 23 4.2 Bit Record .................................................................................................................................................... 36 4.3 Mud Record ................................................................................................................................................. 37 4.4 Drilling Progress ........................................................................................................................................... 38 5 SHOW REPORTS ................................................................................................................................................... 39 6 DAILY REPORTS .................................................................................................................................................... 40 Enclosures 2” / 100’ Formation Log (MD/TVD) 5” / 100’ Formation Log (MD/TVD) 2” / 100’ Drilling Dynamics Log (MD/TVD) 2” / 100’ Gas Ratio Log (MD/TVD) 2” / 100’ LWD Combo Log (MD/TVD) Final Data CD GP 22-13RD3 3 1 MUDLOGGING EQUIPMENT & CREW 1.1 Equipment Summary Parameter Equipment Type /Position Total Downtime Comments Ditch gas QGM Agitator (Mounted in possum belly) Flame ionization total gas & chromatography. 0 hrs. -- Effective Circulating Density (ECD) Haliburton 0 hrs. — Hook Load / Weight on bit PASON 0 hrs. — Mud Flow In PASON 0 hrs. — Mud Flow Out PASON 0 hrs. — Mudlogging Unit Computer System HP Compaq Pentium 4 (X2, DML & Rigwatch) 0 hrs. — Pit Volumes, Pit Gain/Loss PASON 0 hrs. — Pump Pressure PASON 0 hrs. — Pump stroke counters PASON 0 hrs. — Rate of Penetration PASON 0 hrs. — RPM PASON 0 hrs. — 1.2 Crew Mud Logging Unit Type: Arctic Mud Logging Unit Number: ML030 Logging Geologists Years1 Days2 Sample Catchers Years Days2 Josh Dubowski 9 35 Jake Robertson 3 28 Ralph Winkelman 26 16 Garnet Knopp 1 8/16 Paul Webster 38 14 Eric Andrews 5 *1 Years’ experience as Logging Geologist *2 Days at wellsite between rig up and rig down of logging unit. GP 22-13RD3 4 2 GENERAL WELL DETAILS 2.1 Well Objectives GP 22-13RD3 is an oil production well planned to be re-drilled in a South-easterly direction from the existing GP 22-13RD2 utilizing the existing casing program down to 8500’ MD / 8154’ TVD. At 8500’ MD the parent wellbore will be sidetracked and new wellbore drilled penetrating several Tyonek targets. A 4869’ x 6” open hole section is planned. A 5” 23.2# L-80 SLIJ-II prod liner will be run, cemented, and perforated based on data obtained while drilling the interval. The well will be completed with a 2-7/8” gas lift completion. The window was milled from 8495 TOW to 8508’ BOW. Open hole was milled to 8530’ for FIT and an additional 30’ milled to 8560’ for tool clearance. The kickoff point was 8560 ’MD. Multiple issues led to plugging back and re-sidetracking. After plugging back GP 22-13RD3 PB1 and PB2, a cement plug was set and GP 22-13 RD3 was kicked off at 10,099’ MD. TD was reached at 12956’ MD after re-entering the C-6 sand. 5” liner was hung from the 9-5/8” casing. Operator: HILCORP ALASKA, LLC Well Name: GP 22-13RD3 Field: Granite Point Field County: Kenai Peninsula Borough State: Alaska Company Representatives: Marvin Rogers, Rick Brumley, Steve Lawrence, Bob Mize, Clint Montague, Adam Dorr Location: Surface Coordinates 2379' FNL, 1375' FW L, Sec 13, T10N, R12W, SM, AK Mud Line Elevation XXXXXXXX Rotary Table Elevation 129’ RKB Classification: Development - Oil API #: 733-20095-03-00 Permit #: 217-086 Rig Name/Type: Kuukpik 5 / Arctic double Spud Date August 15, 2017 Total Depth Date: September 12, 2017 Total Depth 12,956’ MD /10,745.65’ TVD Primary Targets Tyonek C2 – C6 Total Depth Formation: Tyonek C-6 Completion Status: — LWD-MWD Services. Halliburton / Sperry Drilling Services Directional Drilling Halliburton / Sperry Drilling Services Drilling Fluids Service Halliburton / Baroid Wireline Logging Service — GP 22-13RD3 5 2.2 Hole Data Hole Section Max Depth TD Formation MW ppg Dev oinc Csg Dia Shoe Depth LOT ppg MD (ft) TVD (ft) MD (ft) TVD (ft) 6” Mill 8560’ 8189.51’ Tyonek 8.95 54.5 7” 8508’ 8159.09’ 12.5 6” 12956’ 10745.65’ Tyonek C-6 9.3 84.6 5” n/a 2.3 Daily Activity Summary 16 Aug, 2017: Finish mill window from 8498’ – 8508’. Drill open hole to 8530’. CBU and perform FIT = 12.5 EQMW. Drill additional 30’ to 8560’. Pump hi vis sweep. Pump dry job. POOH to 1290’. Service rig. Load test generators. Continue POOH, L/D 16 joints hwdp and BHA. 17 Aug, 2017: Prep to P/U BHA. Make up BHA as per DD/MWD. Upload and load sources. Pick up pipe 302’ – 1353’. RIH to 6500’ Fill pipe. Cont RIH to 8490’. Fill pipe and get slow pump rates. Continue RIH and tag up at 8546’. Ream to bottom and drill ahead to 8632’. Change out air boot on flow box to flow line outlet. Continue to drill ahead to 8714 at report time. 18 Aug, 2017: Continue drill from 8714’ – 9663’. at report time. Pump sweeps at 8835’ (75% cuttings increase), 9234’ (25% increase) and 9543’ (10% cuttings increase.) 19 Aug, 2017: Continue drilling from9663’ to 9835’. Cbu. Wipe hole back to 9167’. RIH w/ 22 singles. Pump sweep at 9793’ with 50% increase. Drill ahead from 9835’ to 10420’. Pump sweep at 10285’ with 10% increase cuttings. 20 Aug, 2017: Continue drilling from10420’ to 10704’. Pump sweep, 20% increase. POOH to 6247’. Service rig, continue POOH to BHA. Stand back HWDP, jars, collars. Remove source, download MWD. 21 Aug, 2017: Continue downloading MWD. Continue laydown BHA, stabilizer damaged on ILS. P/U MWD, directional tools and download same. Perform pulse test. RIH to 2500’, fill pipe. RIH to 6490’ at top of liner. Break in Geopilot as per directional driller. RIH to 8490’. Slip and cut 129’ drilling line. Service draw works and top drive. Continue RIH to 10661’ Tight at 10146’ and 10510’. Wash to bottom from 10661 to 10700’. Set down with 5K. Down link as per DD. Drill ahead to 10778’ at report time. 22 Aug, 2017: Drill from 10778’ to 11283’, pump sweep at 11095’, 25% increase. Ream out dogleg, 11220’ – 11255’, 12:00 – 18:00. Resume drilling 11283’ TO 11480’. 23 Aug, 2017: Drill from 11480’ to 11781’. Pump sweep at 11532’, 10% increase, 10 bbls late. CBU, POOH to 10248’. CBU. TIH to 10723’. Start time drilling for open hole sidetrack at 10749’. 24 Aug, 2017: Continue time drilling from 10752’ to 10768’. Slipped into old hole. Start over time drill 10752’ depth correction to 10756’. Continue time drill 10756’ to 10760’. 25 Aug, 2017: Continue time drill 10760’ to 10777’. Pump sweep around with 10% increase while continuing to time drill to 10792’. Did not CBU. Returns at 10782’. POOH to 8366’ for BOP test. Install test plug and pressure up for shell test. Leaking by test plug. Trouble shoot and attempt to retest several times. Failed Continue to trouble shoot and retest at report time. GP 22-13RD3 6 26 Aug, 2017: Pull test plug. Drain stack and flush with water. Land test plug and get good seal. Test BOP. Lower IBOP failed. Replacement on the way. Lay down test joint. Pump dry job. POOH for bit and MWD inspection. Service rig at 4644’. Continue POOH. BHA operations at report time. 27 Aug, 2017: Continue make up BHA, Upload, pulse test, survey and load sources. TIH to 610’. Change out lower IBOP and saver sub and test same. TIH to 8481’ and CBU. Fill pipe at 2783’ and 5583’. Max gas at top of window = 16units. Continue TIH to approx 9628’, hole tight. Kelly up. Wash and ream to bottom as needed. At approx 10260’ at report time, wash and ream to bottom. Max gas 53 units from initial bottoms up from 9628’. 28 Aug, 2017: Continue wash and ream to bottom. Tag fill 10’ high at 10792’. Pack off issues while washing down. Drill 10792’ to 11432’ at report time. Pump sweep around at 11185’ with no increase. Service rig at 11406’. 29 Aug, 2017: Drill from 11432’ to 11720’, pump sweep, no increase. Continue drill 11720’ to 11866’. #2 HPU hose failure. Pick up off bottom and repair. Resume drilling 11866’ to 12035 at report time.’ 30 Aug, 2017: Drill from 12035’ to 12337’. Pump 29 barrel sweep and circulate around (MW 9.3 VIS 300+). POOH from 12337’ to 8428’ (tight spots 12060’, 12035’, 11064’, 10021’, 9474’). Cut and slip 146’ drill line, service rig. RIH from 8428’ to 9233’. 31 Aug, 2017: RIH from 9233’ to 10820’ (fill pipe at 10593’). RIH on elevators (pick up single) from 10820’ to 10854’, stacking out 15K. Packed off. Lay down single. Wash and ream from 10820’ to 10832’, packing off issues. Circulate bottoms up. Continue to work packing off issues from 10820’ to 10857’. Wash and ream from 10857’ to 10960’. Checked inclination and found we had sidetracked original hole. Reciprocate pipe and circulate bottoms up. POOH from 10960’ to 10661’, put 1/2 turn in pipe and attempt to enter new open-hole sidetrack with no success. RIH from 10661’ to 10848’. Trough hole from 10848’ to 10887’. Circulate and attempt to get back in hole to 10903’. POOH from 10903’ to 8428’ (tight spot 8790’). Circulate bottoms up. POOH from 8428’ to 1605’. 1 Sept, 2017: POOH from 1605’ to 114’. Unload sources, download MWD. Lay down BHA. Clean and clear rig floor. Service rig. Make up 3.5” cement stinger. RIH from 664’ to 8414’. Prep for cement job. RIH from 8414’ to 10835’. Break circulation. Wash down and tag up at 10853’. Circulate and work pipe. 2 Sept, 2017: Condition and circulate mud while rigging up cementers. Pump 9.1 bbls 16.5ppg cement, pump 8 bbls mud push, displace 138 bbls OBM. POOH from 10852’ to 10525’, pick up 15’ pup joint. RIH to 10597’. Circulate and condition mud. Pum 21 bbls 12ppg mud push, pump 22.7 bbls 16.5ppg cement, 11 bbls mud push, 118 bbls OBM to chase. Rig down cementing equipment. POOH from 10825’ to 9715’. Circulate and condition hole clean. POOH from 9715’ to 8356’. Service rig. POOH from 8356’ to 664’. 3 Sept, 2017: POOH from 664’ to surface, laying down 3.5” cement stinger. Clean and clear rig floor. Flush stack. Check koomey bottles and fedder bolt clamp bolts. Begin making up BHA. Observe geo pilot leaking oil from top seals. Decide to wait on new geo pilot from Anchorage. Work on mud pump 2. Change out agitator on Pit 5. Strap 5” liner. Build shelves in conex. Slip and cut drilling line 113’. Drift 5” liner. Work on rig doing various maintenance items. Pick and make up BHA #6. RIH from 302’ to 2038’. 4 Sept, 2017: Continue to RIH from 2038’ to 9668’. Wash and ream from 9668’ to 9771’ (packing off at 9771’). Wash and ream from 9771’ to 10099’ (cement stringers from 9771’ to 9928’ with associated packing off issues).Time drill from 10099’ to 10135’. Bring WOB and ROP up from 10135’ to 10146’. Start over time drilling from 10120’ to 10144’. 5 Sept, 2017: Time drill from 10144’ to 10190’ (Sidetracked at 10145’). Drill from 10190’ to 10533’ (hard spot at 10378’). Trouble shoot MWD. Pull 2 stands to 10411’. Circulate bottoms up. POOH from to 8359’. Pump dry job. GP 22-13RD3 7 6 Sept, 2017: POOH from 8359’ to 302’. Stand back and lay down BHA to 119’. Upload radioactive sources. Download MWD. Lay down and stand back BHA. Break bit. Make up BHA, upload MWD, and shallow-hole test MWD. RIH from 313’ to 5898’ (fill pipe at 5586’). Make-up tong stuck. Trouble shoot make-up tong. RIH from 5898’ to 5961’. Continue to trouble shoot make-up tong issue. RIH to 6085’. Continue to trouble shoot make up tong issue. 7 Sept, 2017: Continue to trouble shoot make up tong issue. Finagle a solution. RIH from 5898’ to 10356’. Wash and ream from 10356’ to 10533’. Drill from 10533’ to 10933’. 8 Sept, 2017: Drill from 10933’ to 11867’, mad passing every slide. 9 Sept, 2017: Drill from 11867’ to 11913’. Pump high vis sweep and circulate around (10 barrels late, 10% increase in flow). POOH from 11913’ to 11285’. Retake surveys while pumping out from 11285’ to 11095’. POOH from 11095’ to 10730’. Retake survey at 10730’. Mad pass from 10669’ to 10612’. POOH from 10612’ to 8427’. Prepare for BOP test. Test BOP. Cut and slip 169’ of drilling line. 10 Sept, 2017: Service rig. RIH from 8427’ to 11857’. Break circulation (occasionally packing off). Wash and ream from 11857’ to 11913’. Drill from 11913’ to 12375’ (Mad Passing all slides). 11 Sept, 2017: Drill from 12375’ to 12924’ (Mad Passing all slides). 12 Sept, 2017: Drill from 12924’ to 12956’ (Mad Passing all slides). ROP stopped at 12956’. Circulate high viscosity lube sweep to bit, attempt to drill, no good. Finish circulating sweep. POOH from 12756’ to 1306’. Lay down 32 joints of drill pipe. Rack back HWDP, jars, and collars. Remove nuclear sources. Download MWD. Lay down remaining BHA. Clean and clear rig floor. GP 22-13RD3 8 3 GEOLOGICAL DATA 3.1 Lithostratigraphy Tops picked by Hilcorp Geologist Corey Ramstad FORMATION PROGNOSED ACTUAL MD (ft) TVD (ft) SSTVD (ft) MD (ft) TVD (ft) SSTVD (ft) KOP 8500 8154 -8029 C2 9707 9095 -8980 Side Track KOP 10,099’ 9427’ -9298’ C5 10,201 9512 -9400 C6 10,467 9737 -9630 CTD 13,169 10,913 -10,750 12,958’ 10,746’ 10,617’ GP 22-13RD3 9 3.2 Lithology Details Lithology descriptions of all Kenai Group and Mesozoic rock cuttings samples started immediately after drilling out the surface conductor, then continued as per pre-set plans and procedures, and modified when directed by the Hilcorp operations geologist. The Kenai Group of Alaska’s Cook Inlet Basin, which includes the Sterling, Beluga, Tyonek, Hemlock and West Foreland Formations, was deposited by a variable-energy fluvial system within a large closed fore- arc basin. The characteristic sedimentary stratigraphy consists of dominant massive to thinly bedded sandstone and claystone-siltstone, generally abundant thin interbeds of air fall and re-deposited volcanic ash, minor beds of basal or modal conglomerate and extensively-distributed thin beds of coal and carbonaceous rocks. Gradational upward-fining sequences and bi-modal distribution zones are abundant within sandstone sections. Note that in Canrig’s Lithology Descriptions, the special modifying term “tuffaceous” was created to address the pervasive presence and diversity of soft-sediment volcanogenic- origin rocks in the Cook Inlet area. Though generally applied to significantly ash-rich clay-silt-sand lithologies, its wide use in descriptions may include discernible micro-shard concentrations of disaggregated volcanic glass to vitric air fall volcanic ash to smectite-bentonite clays derived from devitrified ash to rare layers of vitric ignimbrite. Lithology Claystone (8510' - 8560') = medium gray to light medium gray with dark brown to yellowish hues; moderate induration; semi tough to crumbly; irregular to planar fracture; dull to earthy to slightly waxy luster; silty to clayey texture; relatively thick and interbedded with thin sands and siltstone; trace coal. Tuffaceous Claystone/ Tuffaceous Siltstone (8560' - 8640') = medium to medium light gray with light gray secondary hues; firm to crumbly; irregular shaped with pdc bit action shaped comm on; silty to clayey texture; dull to earthy luster easily rehydrated; very soft and mushy; good cohesiveness; poor adhesiveness non calcareous; trace dark brown to black microthin carbonaceous laminations and inclusions; no hydrocarbon indicators. Sand/ Sandstone (8640' - 8690') = light brown to brownish gray overall from oil base mud, individual grains dominantly clear to translucent quartz and volcanic glass, light to medium gray, black very fine upper to medium lower, dominantly fine; angular to subrounded, dominantly subangular; fair to good sorting dominantly unconsolidated with scattered sandstone; very firm to slightly hard; friable at times; fine to medium; grain supported; non calcareous; trace coal. Sand/ Tuffaceous Sandstone (8690' - 8770') = medium light to light gray overall with abundant varicolored secondary hues presenting a mottled appearance; soft to slightly firm; irregular shaped; very ashy matrix supports lose sand grains; dominantly clear to translucent quartz; fine lower to medium lower; subangular moderately well sorted. Coal (8770' - 8790') = black with brownish black secondary hues; very firm to hard and brittle; wedgelike to platy and flaky; earthy luster; smooth to slightly silty texture; planar fracture dominant; bituminous to sub bituminous. Tuffaceous Claystone/ Siltstone (8810' - 8890') = dark brown with pale yellow hues to dark brownish gray to medium dark gray; poor to slightly moderate induration; crumbly to brittle to trace semi tough; irregular to planar fracture; platy to bit stacked cuttings; dull to earthy to greasy luster; clayey to silty to slightly gritty texture; trace deformed carbonaceous banding; non calcareous; semi hydrophilic; moderate pale brownish gray siltstone; minor quartz rich sands; devitrified ash clumps common; very poor sample quality due do to soltex contamination. GP 22-13RD3 10 Tuffaceous Sandstone/ Sand (8890' - 8960') = medium grayish brown to dark yellowish brown; easily to moderate friable to firm to trace unconsolidated; lower medium to upper fine with lower coarse to lower fine common; moderate sorting; sub angular to sub rounded to sub spherical to sub discoidal; grain supported to trace matrix supported clasts; matrix composed primarily of devitrified ash; non calcareous; dominated by clear to translucent quartz; minor amounts of shale and tuffaceous siltstone clasts. Tuffaceous Sandstone/ Siltstone (8960' - 9060') = dark yellowish brown to medium brown with dark gray to black hues; moderate to easily friable to minor unconsolidated; lower medium to upper fine with lower fine to lower coarse common; moderate sorting; sub angular to sub rounded; sub spherical to sub discoidal; 50/50 grain and matrix supported; matrix composed primarily of devitrified ash; pure ash clasts common but not abundant; non calcareous; dominated by clear to translucent quartz; siltstones are typically dark blackish gray to dark grayish brown; moderate induration; irregular to planar fracture; planar to bit stacked cuttings; dull to earthy luster; silty texture; trace carbonaceous banding; minor shales. Tuffaceous Sandstone/ Siltstone (9060' - 9160') = dark brown with reddish yellow hues to dark medium brown with dark gray to black hues; moderate to easily friable to minor unconsolidated; lower medium to upper fine with upper very fine to lower coarse common; moderate sorting; sub angular to sub rounded; sub spherical to sub discoidal; contains both grain and matrix supported clasts; non calcareous; dominated by clear to translucent quartz; siltstones are typically dark grayish brown to dark blackish gray; moderate to poor induration; irregular to planar fracture; planar to bit stacked cuttings; dull to earthy luster; silty texture; trace carbonaceous banding; minor shales. Tuffaceous Siltstone/ Claystone (9160' - 9250') = dark brownish gray with blackish hues to pale yellowish brown to medium brown; crumbly to brittle to trace semi tough; poor to moderate induration; planar to irregular to trace earthy fracture; platy to bit stacked cuttings; dull to earthy; clayey to silty to gritty texture; predominantly non calcareous with trace hcl reaction on some ash heavy clasts; semi hydrophilic overall; dark blackish gray claystone; grades to a moderately indurated shale; planar to slightly conchoidal fracture; dull to greasy luster; minor tuffaceous sandstones and unconsolidated sands. Tuffaceous Claystone/ Sandstone (9250' - 9320') = dark blackish brown to dark brown with pale yellow hues; moderate to poor induration; semi tough to crumbly; planar to irregular to occasional conchoidal fracture; platy to tabular to bit stacked cuttings; dull to earthy to greasy luster; sandstone is easily friable to unconsolidated; upper fine to upper medium; moderate sorting; sub rounded to sub angular; sub spherical to spherical; non calcareous. Sand/ Conglomeratic Sand/ Tuffaceous Sandstone (9320' - 9400') = medium brown to medium light brownish gray overall, note: brownish hues derived from oil base mud; individual grains dominantly clear to translucent quartz and volcanic glass, light to dark gray, pale rose and dusky red and white; very fine upper to very coarse upper with fragments to 5mm, dominantly fine upper to medium upper; angular to subrounded, dominantly subangular; poorly sorted; dominantly unconsolidated with scattered to common ash supported grains; ashy matrix is soft to fragile; very light gray with abundant secondary hues; non calcareous. Tuffaceous Claystone/ Tuffaceous Siltstone (9400'-9470') = note: 9450' sample heavily contaminated with soltex mud additive; medium to medium dark gray with brownish gray secondary hues; irregular shaped with common pdc bit action cuttings; firm to moderately hard; silty to clayey texture; dull to earthy luster easily rehydrated; common dark brown to black microthin carbonaceous laminations and inclusions; non calcareous; trace thin coal beds. Coal (9470' - 9530') = note: 9540' sample heavily contaminated with soltex; black with brownish black secondary hues; firm to hard and brittle; splintery to planar fracture with trace conchoidal; platy to flaky to wedgelike; earthy to resinous luster; smooth to slightly silty texture moderately well to well developed; bituminous; no outgassing observed; present as thin beds in dominantly interbedded sands and claystone/ siltstones. GP 22-13RD3 11 Tuffaceous Claystone/ Tuffaceous Siltstone (9530'-9600') = note: 9570' sample heavily contaminated with soltex; medium to medium dark gray to brown with brownish gray secondary hues; irregular shaped with common pdc bit action cuttings; firm to moderately hard; silty to clayey texture; dull to earthy luster; easily rehydrated; common dark brown to black microthin carbonaceous laminations and inclusions; non calcareous; trace to common thin coal beds; no outgassing. Coal (9600' - 9660') = black with brownish black and grayish black secondary hues; very firm to hard and brittle; splintery to planar fracture; platy to flaky to wedgelike; earthy to resinous luster; smooth to slightly silty texture; moderately well to well developed; bituminous; no outgassing observed; present as thin beds in dominantly interbedded sands and claystone/ siltstones; note: continued soltex mud additive contamination; very heavy at times. Sand/ Tuffaceous Sandstone (9660' - 9730') = medium light gray overall with individual grains dominantly clear to translucent quartz and volcanic glass; very fine upper to medium lower; angular to subangular; well sorted; common ashy matrix; fragile; no fluorescence above oil mud background, dull uniform, greenish yellow with trace mineral fluorescence. Sand/ Conglomeratic Sand (9730'-9790') = medium brownish gray to light grayish brown; individual grains dominantly clear to translucent quartz and volcanic glass, light to dark gray, pale rose and dusky red and white; very fine upper to very coarse upper; dominantly fine upper to coarse lower; angular to subangular with minor subrounded; poor sorting; dominantly unconsolidated; no fluorescence above oil base mud background of dull greenish yellow. Tuffaceous Sandstone/ Sand (9790' - 9860') = very light yellowish brown with light gray and grayish white secondary hues; easily friable to unconsolidated; upper fine to lower coarse; poor to moderate sorting; sub rounded to sub angular to rounded; sub spherical to trace sub discoidal; grain supported; dominated by clear to translucent quartz with common dark lithics; trace reaction to hcl; minor siltstones and shales; very dull greenish yellow fluorescence; no odor; no staining. Tuffaceous Sandstone/ Sand (9850' - 9950') = light medium gray with pale yellowish hues to medium brown with red to black hues; easily friable to unconsolidated; upper fine to upper medium to upper coarse and upper very fine; poor to moderate sorting; sub rounded to sub angular to angular; sub spherical to trace sub discoidal; grain supported; dominated by clear to translucent quartz with common dark lithics; minor carbonaceous shale sediment; ashy matrix; trace reaction to hcl; minor siltstones and shales; very dull greenish yellow fluorescence; no cut; no odor. Tuffaceous Sandstone/ Claystone (9950'- 10060') = medium brown with reddish hues to light medium gray to brown with pale yellowish hues; easily friable to unconsolidated; lower medium to upper fine to upper medium and lower fine; poor to moderate sorting; sub angular to sub rounded to rounded; sub spherical to sub discoidal; grain supported; dominated by clear to translucent quartz; common dark lithics; minor carbonaceous shale sediment; ashy matrix; trace reaction to hcl; claystones are dark blackish brown to dark brown with pale yellow and red hues; moderate induration; semi tough; planar to irregular to occasional conchoidal fracture; platy to tabular to bit stacked cuttings; dull to earthy to greasy luster; dull yellowish white fluorescence due to obm contamination; no cut; no odor. Tuffaceous Siltstone (10060' - 10140') = dark medium gray with blackish hues to dark brown with dark gray to black hues; moderate to good induration; tough to trace crumbly; planar to irregular to trace blocky fracture; platy to tabular to bit stacked cuttings habit; dull to earthy to greasy luster; silty to gritty texture; thick to thin and interbedded with thin claystones and minor amounts of carbonaceous shales and sand; non calcareous; semi hydrophilic; trace very dull yellowish white fluorescence; no odor; no cut. GP 22-13RD3 12 Coal (10140'- 10180') = black; very firm to hard and brittle; planar fracture dominant with trace conchoidal; platy to flaky; earthy to resinous luster; smooth to slightly silty texture; bituminous; no outgassing present; dull yellowish white fluorescence background from obm. Sand (10180' - 10220') = note: heavily contaminated with soltex; brownish gray overall with individual grains clear to translucent quartz and volcanic glass, light to dark gray; fine lower to medium upper; angular to subrounded, dominantly subangular; poor to fair sorting; unconsolidated; obm background fluorescence. Sand/ Tuffaceous Sandstone/ Sandstone (10220'- 10330') = light to medium light grayish brown with light yellowish brown secondary hues overall, individual grain dominantly clear to translucent quartz and volcanic glass, light to dark gray, trace dusky red; very fine upper to very coarse upper, dominantly fine upper to medium upper; angular to subrounded, dominantly subangular; poor to fair sorting; dominantly unconsolidated with ashy matrix supported grains; very fragile; non calcareous; dull yellowish white obm background fluorescence with trace bright yellowish white mineral fluorescence from ashy matrix sand; no odor; no cut; bright yellowish white cut fluorescence from obm; no free oil observed; note: heavy soltex contamination in 10260' and 10320' sample. Sand/ Conglomeratic Sand/ Tuffaceous Sandstone (10330' - 10400') = medium to medium light gray overall with a weak yellowish brown secondary hue in ashy sandstone; clear to translucent quartz and volcanic glass, light green to greenish gray, pale rose and dusky red; very fine upper to very coarse upper, dominantly fine upper to medium upper; angular to subangular; poorly sorted; dominantly unconsolidated with common ashy supported grains; thin to moderate coal beds; dull yellowish white fluorescence from obm; no free oil detected. Tuffaceous Claystone/ Tuffaceous Siltstone (10400' - 10480') = medium to medium dark gray to grayish brown; very firm to hard and brittle; irregular, wedge and pdc bit action shaped; silty to clay texture; dull, earthy luster; hydrophilic; broken fragments exposed to water are very expansive and soluble; dull yellowish white fluorescence from obm; no cut or fluorescence above obm background. Coal (10480' - 10510') = black; brittle to crumbly; flaky to scaly; planar fracture dominant with trace conchoidal; resinous luster; smooth to matte texture; well developed; bituminous; no outgassing present; no sample fluorescence. Sand/ Sandstone/ Tuffaceous Sandstone (10510' - 10610') = medium to medium light gray to light brownish gray overall with individual grains dominantly clear to translucent quartz and volcanic glass, light to medium dark gray; unconsolidated to easily friable; lower fine to upper medium to upper coarse; moderate to poor sorting; sub rounded to sub angular to rounded; sub sphericity to sub discoidal; obm and soltex contamination makes show characteristics difficult to determine; <10% patchy dull yellowish white fluorescence above background obm; pale yellowish white, slow to moderate streaming cut fluorescence; straw to pale brown visible cut; pale yellow residual cut fluorescence; pale straw residual cut; no visible staining or odor above background obm contamination. Tuffaceous Claystone/ Sand (10610' - 10700') = dark brownish gray to dark medium gray with blackish hues; moderate to good induration; semi tough to crumbly; irregular to blocky to semi planar fracture; platy to tabular cuttings; dull to earthy to semi waxy luster; silty to clayey texture; thick to thin and interbedded with thin sands and coal; patchy dull fluorescence on <3% of sample; no cut or odor. Tuffaceous Claystone/ Tuffaceous Siltstone (10700' - 10770') = medium to medium dark gray with medium light gray and light brownish gray secondary hues; firm to hard; irregular wedge shaped; silty to clayey texture; dull luster; hydrophilic; trace dark brown to black microthin carbonaceous laminations and inclusions; dull yellowish white obm background fluorescence; no cut, cut fluorescence or odor above obm background. GP 22-13RD3 13 Sand/ Sandstone (10770' - 10850') = light gray to light yellowish gray overall with individual grains dominantly clear to translucent quartz and volcanic glass trace dark liths; fine lower to medium upper; angular to subangular; moderately well sorted; fragile; weak calcareous cement; present as minor fraction of claystone/ siltstone formation; trace thin coal beds; obm background fluorescence. Coal (10850' - 10900') = black; brittle to crumbly; flaky to scaly; planar fracture dominant with trace conchoidal; resinous luster; smooth to matte texture; well developed; bituminous; no outgassing present; no sample fluorescence above background for obm. Tuffaceous Claystone/ Tuffaceous Siltstone (10900' - 10960') = medium light to medium gray with light brownish gray secondary hues; irregular, wedgelike and pdc bit action shaped; firm to moderately hard to brittle; silty to clayey texture; good to moderate induration; irregular to planar fracture; dull to earthy to slightly greasy luster; thick to thin and interbedded with thin sands; minor carbonaceous banding and sediment; no hydrocarbon indicators. Tuffaceous Sandstone/ Sand (10970' - 11050') = dark medium brown to dark medium gray with brown and minor yellowish hues; easily friable to unconsolidated to trace firm; upper fine to lower medium; occasional lower coarse to lower fine; moderate to well sorted; sub rounded to rounded; minor sub angular; spherical to sub discoidal; grain supported ashy matrix; non calcareous; obm masking or making oil show indicators difficult to quantify; weak dull white fluorescence across sample; slow streaming transparent white cut; faint straw to pale brown visible cut; pale yellowish white residual fluorescence; no odor; no visible staining. Coal (11050' - 11100') = dark to matte black to dark brownish black to grayish black; brittle to crumbly; planar to hackly to irregular fracture; platy to flaky to slightly wedgelike cuttings habit; resinous to greasy luster; matte to smooth texture; sub bituminous to bituminous; no visible de-gassing. Tuffaceous Claystone/ Coal (11100' - 11160') = very dark gray to blackish gray to trace dark brownish gray; good to moderate induration; tough to trace brittle and crumbly; irregular to planar fracture; tabular to platy cuttings habit; silty to smooth texture; dull to earthy to slightly greasy luster; trace carbonaceous banding; thick to thin and interbedded with thin coals and carbonaceous shale; no hydrocarbon indicators. Coal/ Tuffaceous Claystone (11160' - 11260') = dark black to matte black to dark grayish black; tough to brittle; platy to flaky to slightly wedgelike cuttings habit; planar to hackly to irregular fracture; sub bituminous to bituminous; resinous luster; matte to smooth texture; no visible de-gassing; the claystones are very dark gray to blackish gray to trace dark brownish gray; good to moderate induration; irregular to planar fracture; tough to trace crumbly to brittle; platy to tabular cuttings habit; smooth texture; dull to slightly greasy luster; trace carbonaceous banding; overall thick to thin alternating beds with trace laminae; no hydrocarbon indicators. Coal (11260' - 11320') = black with brownish black secondary hues; very firm to hard and brittle; platy to flaky, massive at times; irregular to wedge shaped; planar fracture dominant with trace conchoidal and birdeye; earthy to resinous luster; smooth to matte texture; well developed; bituminous; no outgassing; no sample fluorescence above obm background Coal/ Tuffaceous Siltstone/ Tuffaceous Claystone (11320' - 11400') = black with brownish black secondary hues; very firm to hard and brittle; platy to flaky, massive at times; planar fracture dominant with conchoidal and birdeye common; slightly earthy to resinous luster; smooth to matte texture; well developed; bituminous; no outgassing; siltstone is gray to grayish black; irregular to wedgelike; firm to brittle; silty to clayey texture; dull to slightly waxy luster; hydrophilic; trace sand/ sandstone; no sample fluorescence above obm background GP 22-13RD3 14 Coal (1140' - 11460') = black with brownish black secondary hues; very firm to hard and brittle; platy to flaky, massive at times; irregular to wedge shaped; planar fracture dominant with trace conchoidal and birdeye; earthy to resinous luster; smooth to matte texture; well developed; bituminous; no outgassing; commonly interbedded with dark to medium dark gray siltstone/ claystone; very firm to brittle; very hydrophilic; dull yellowish white obm background fluorescence. Tuffaceous Claystone/ Tuffaceous Siltstone (11460' - 11530') = medium dark to dark gray with medium gray and medium grayish brown secondary hues; firm to hard; irregular, wedgelike with scattered pdc bit action shaped cuttings; silty to clayey texture; dull, earthy to slightly waxy luster; hydrophilic; moderate to very soluble when hydrated; trace coal; dull yellow obm fluorescence. Tuffaceous Claystone/ Tuffaceous Siltstone (11530' - 11600') = medium dark to dark gray with medium gray and medium olive gray secondary hues; firm to hard and brittle at times; irregular to flaky with trace pdc bit action shaped cutting; silty to clayey texture; dull, earthy to slightly waxy luster; trace sand; trace thin coals interbedded; dull yellowish white fluorescence from obm; no oil indicators present. Coal (11600' - 11640') = grayish black to dark to matte black to dark brownish black; brittle to crumbly to semi tough; planar to hackly; platy to flaky cuttings habit; resinous to greasy luster; matte to smooth texture; subbituminous to bituminous; no visible degassing. Tuffaceous Claystone/ Siltstone (11640' - 11720') = dark blackish gray to dark brownish gray with black to pale yellow hues; tough to slightly brittle; good to moderate induration; planar to irregular fracture; platy to bit stacked cuttings; dull to earthy luster; silty to gritty texture; semi hydrophilic overall; dark blackish gray siltstone; grades to a moderately indurated shale; planar to slightly conchoidal fracture; dull to greasy luster; coal and carbonaceous shale common but not abundant; minor tuffaceous sandstones and trace unconsolidated sands. Tuffaceous Sandstone/ Sand (11720' - 11781') = dark yellowish brown; easily friable to unconsolidated; lower medium to upper fine; to lower medium; moderate sorting; sub rounded; sub spherical; matrix supported; non calcareous; obm making oil show indicators difficult to quantify; weak dull white patchy fluorescence; very slow streaming transparent white cut; very pale straw visible cut; no visible residual cut; weak yellowish white residual fluorescence; no odor; no visible staining. Pull back to 10749’ for open hole sidetrack Tuffaceous Sandstone/Claystone (10750' - 10790') = dark grayish brown to blackish brown with pale yellow hues; unconsolidated to easily friable to trace firm; upper medium to upper fine. Coal (10800' - 10830') = black; brittle to crumbly; flaky to scaly; planar fracture dominant with trace conchoidal; resinous luster; smooth to matte texture; well developed; bituminous; no outgassing present; no sample fluorescence above background for obm. Tuffaceous Claystone/Tuffaceous Siltstone (10830' - 10900') = medium light to medium gray with light brownish gray secondary hues; irregular, wedgelike and pdc bit action shaped; firm to moderately hard to brittle; silty to clayey texture; good to moderate induration; irregular to planar fracture; dull to earthy to slightly greasy luster; thick to thin and interbedded with thin sands; minor carbonaceous banding and sediment; no hydrocarbon indicators Tuffaceous Claystone (10900' - 10960') = very dark gray to blackish gray to trace dark brownish gray; good to moderate induration; irregular to planar fracture; tough to trace crumbly to brittle; platy to tabular cuttings habit; smooth texture; dull to slightly greasy luster; trace carbonaceous banding; overall thick to thin alternating beds with trace laminae; no hydrocarbon indicators. GP 22-13RD3 15 Coal (10960' - 11010') = dark black to matte black to dark grayish black; tough to brittle; platy to flaky to slightly wedgelike cuttings habit; planar to hackly to irregular fracture; sub bituminous to bituminous; resinous luster; matte to smooth texture; no visible de-gassing; Tuffaceous Claystone/Sandstone(11010' - 11140') = dark blackish gray to dark brownish gray with black to pale yellow hues; tough to slightly brittle; good to moderate induration; planar to irregular fracture; platy to bit stacked cuttings; dull to earthy luster; silty to gritty texture; the sandstones are dark yellowish brown to dark medium grey with brown and black hues; easily friable to unconsolidated; lower medium to upper fine to lower medium; moderate sorting; sub rounded to sub spherical; matrix supported; non calcareous; dominated by clear to translucent quartz; carbonaceous banding semi common; minor dark lithics; obm making oil show indicators difficult to quantify; minor dull weak white patchy fluorescence; slow, streaming transparent white cut; visible very pale straw cut; no visible residual cut; weak yellowish white residual fluorescence; no odor; no visible staining. Coal/Carbonaceous Shale (11140'-11240') = black with brownish black and grayish black secondary hues; firm to hard and brittle, crumbly at times; flaky to platy; planar fracture dominant with trace conchoidal and birdeye; smooth to slightly matte texture; resinous to slightly silty texture; bituminous overall with common grading to a less developed carbonaceous shale; grayish black; firm to brittle; platy; no outgassing; present as thin beds in dominantly claystone/siltstone formation; dull yellowish white sample fluorescence from obm; instant bright yellowish white cut fluorescence; light straw visible cut; strong yellowish orange residual ring fluorescence; no oil indicators above obm background levels. Sand/Tuffaceous Sandstone (11240' - 11330') = medium gray with light yellowish gray and light brownish gray secondary hues overall with individual grains dominantly clear to translucent quartz and volcanic glass, light to medium gray and trace darker lithologies; very fine lower to trace very coarse upper, dominantly fine lower to medium lower; angular to subangular with trace subrounded; poor to fair sorting in fine to medium; dominantly unconsolidated with ashy matrix common; sandstone grades to silty sandstone/sandy siltstone; note: abundantsoltex contamination; dull yellowish white sample fluorescence; no oil indicators above obm background levels. Tuffaceous Claystone/Tuffaceous Siltstone (11330' - 11400') = medium gray with medium light gray and brownish gray secondary hues; firm to fragile and brittle, occasionally hard; irregular, wedge shape with curved pdc bit action curved appearance common; silty to clayey texture; earthy to slightly waxy luster; hydrophilic; scattered interbedded coals throughout interval; very uniform, dull yellowish white sample fluorescence, no oil indicators present above obm background levels. Tuffaceous Claystone/Tuffaceous Siltstone (11400' - 11500') = medium gray with medium light gray and brownish gray secondary hues; firm to fragile and brittle, occasionally hard; irregular, wedgelike with pdc bit action shaped; silty to clayey texture; dull, earthy to slightly waxy luster; hydrophilic; trace dark brown to black microthin carbonaceous laminations and inclusions; trace very thin coal beds/ carbonaceous material; uniform, dull yellow sample fluorescence; no oil indicators above obm background levels; note: continued soltex mud additive contamination masking oil indicators in addition to obm. Tuffaceous Sandstone/Sand (11500' - 11620') = dark medium brown with dark yellowish hues to dark grayish brown with blackish hues; easily friable to semi firm to unconsolidated; upper medium to upper fine with lower fine to lower coarse common; sub rounded to rounded; spherical to sub discoidal; moderate sorting; matrix supported with grain supported clasts semi common; non calcareous; dominated by clear to translucent quartz; minor dark lithics and carbonaceous sediment; trace claystone and siltstone; hydrocarbon indicators continue to be difficult to discern from obm; patchy dull yellowish white fluorescence on <5% of sample; slow translucent streaming cut; no visible cut; dull greenish white residual fluorescent cut; dull brown to amber visual residual cut; no odor or staining. GP 22-13RD3 16 Tuffaceous sandstone/sand (11620' - 11720') = dark medium yellowish brown to dark grayish brown with blackish hues; easily friable to semi firm to unconsolidated; upper medium to upper fine with lower fine to lower coarse common; sub rounded to sub angular to rounded; sub spherical to subdiscoidal; moderate sorting; matrix supported; non calcareous; dominated by clear to translucent quartz; minor dark lithics and carbonaceous sediment; trace claystone and siltstone; patchy dull yellowish white fluorescence on <5% of sample; slow translucent streaming cut; dull greenish white residual fluorescent cut; no visible cut; dull brown to dark amber visual residual cut; no odor; no staining. Tuffaceous Sandstone/Sand (11720' - 11830') = medium brown to dark grayish brown with dark yellow hues; unconsolidated to easily friable; trace firm; lower fine to upper medium; coarsening up down through interval; trace 2-5mm grains near base typically bit shattered; sub rounded to sub angular to rounded; sub spherical to sub discoidal; moderate sorting shifting to poor down through; grain to minor matrix supported; slightly calcareous; dominated by clear to translucent quartz; minor dark lithics and carbonaceous sediment; trace claystone and siltstone; patchy dull yellowish white fluorescence on <15% of sample; very slow, moderate bluish white, translucent, streaming cut; weak yellowish white residual fluorescence; no visible cut; no residual visible cut; no odor; no staining. Tuffaceous Claystone/Tuffaceous Siltstone (11830' - 11920') = medium gray to grayish brown; firm to moderately hard and brittle at times; irregular shaped with pdc bit action common; silty to clayey texture; dull to slightly waxy luster; moderately hydrophilic; non calcareous; siltstone occasionally grades between silty sandstone/ sandy siltstone light yellowish brown; fragile; irregular shaped; uniform dull yellow/ gold sample fluorescence from obm; fast bright yellowish white cut fluorescence; no visible cut; no stain or free oil; obm and soltex masking oil show properties. Tuffaceous Sandstone/Sand/Conglomeratic Sand (11920' - 12000') = medium to medium light gray with light brown to brownish gray secondary hues overall, individual grains dominantly clear to translucent quartz and volcanic glass, medium to dark gray; very fine upper to trace very coarse upper with broken fragments, dominantly fine upper to medium lower; angular to trace subrounded, dominantly subangular; fair to good sorting very loosely consolidated with ashy matrix; fragile to friable, pulverulent at times; non calcareous; dull yellowish gold uniform fluorescence; no oil indicators above obm background levels; continued soltex mud additive contamination. Tuffaceous Claystone/Tuffaceous Siltstone (12000' - 12090') = medium gray to olive gray; firm to moderately hard and brittle at times; irregular shaped with pdc bit action common; silty to clayey texture; dull to slightly waxy luster; moderately hydrophilic; non calcareous; common thin coal beds; black; hard to brittle; uniform dull yellow to gold fluorescence; fast bright yellowish white cut fluorescence; no visible cut; gold residual ring fluorescence; no odor or free oil; no oil indicators are above obm background level. Tuffaceous Sandstone/Sand (12100' - 12200') = medium grayish brown to medium gray with brown to black hues; unconsolidated to easily friable to trace firm; lower medium to lower fine with lower coarse to upper medium common; sub rounded to sub angular; sub spherical to sub discoidal; moderate sorting; dominated by clear to translucent quartz; trace bit broken quartz grains; minor dark lithics grain supported; clay content in matrix increasing down through the interval; very weak dull goldish fluorescence; slow streaming transparent white cut fluorescence; no visible cut; dull goldish yellow residual fluorescence; no residual visible cut; no odor or staining. Sandstone/Sand (12200' - 12300') = medium brown with grayish hues to medium gray with brown to black hues; easily friable to unconsolidated to trace firm; lower medium to upper fine with lower coarse to lower fine common; sub rounded to sub angular; sub spherical to sub discoidal; moderate sorting; dominated by clear to translucent quartz; trace bit broken quartz grains; minor dark lithics grain supported; grain supported by clay matrix with tuffaceous clasts being uncommon; weak dull yellow gold fluorescence; slow streaming transparent bluish white cut fluorescence; no visible cut; dull goldish yellow residual fluorescence; no residual visible cut; no odor or staining. GP 22-13RD3 17 Pull back to 10099’ for cement plug sidetrack Tuffaceous Claystone (10115' - 10140') = medium gray; platy to "bit-curled" pdc cuttings; moderate to very firm; moderately to slightly crumbly; dull luster; very finely grainy texture; no detectable oil indicators over obm. Sand / Tuffaceous Sandstone / Sandstone (10140'- 10230') = light to medium light grayish brown with light yellowish brown secondary hues; light to dark gray, trace dusky red; unconsolidated to easily friable to trace firm; lower fine to upper coarse, predominantly upper medium to upper fine; sub angular to sub rounded; poor to fair sorting; grain to minor matrix supported; ashy matrix; non calcareous; dull yellowish white obm background fluorescence with trace patchy yellowish white fluorescence; no visible cut; moderate translucent slow white cut fluorescence; no staining; no odor. Sand / Conglomeratic Sand / Tuffaceous Sandstone (10230' - 10310') = medium to medium light gray overall with a pale yellowish brown secondary hue; unconsolidated to easily friable; upper very fine to upper very coarse; predominantly upper fine to upper medium; sub angular to sub rounded to angular; poorly sorted; sub spherical to sub discoidal; clear to translucent quartz dominant; trace bit broken 2-4mm grains; interbedded with minor thin coals; dull yellowish white fluorescence; no visual cut; very slow, translucent, streaming fluorescent cut; no staining; no odor. Sand / Conglomeratic Sand / Tuffaceous Sandstone (10320' - 10390') = dark medium gray with pale brownish hues; unconsolidated to easily friable; upper very fine to upper very coarse; sub angular to sub rounded to angular; poor to moderate sorting; sub spherical to sub discoidal; clear to translucent quartz dominant; trace bit broken 2-6mm grains; dull yellowish white cut fluorescence; no visual cut; very slow, translucent, streaming fluorescent cut; dull yellowish gold residual fluorescence; no staining; no odor. Sand (10395' - 10450') = dominant clear, occasional translucent; lower very fine to upper fine, dominant lower fine to upper very fine; well sorted; subround to subangular; moderate to high sphericity; dominant quartz, occasional miscellaneous lithics; 100% dull yellow sample fluorescence from obm with trace brighter cuttings that when segregated exhibit weak crush cut fluorescence with moderately bright yellow residual cut fl and light straw brown residual. Tuffaceous Claystone (10460' - 10495') = dark dusky brown with strong grayish hues; blocky cuttings; firm to very firm; slight to moderate crumbly; dull luster; very finely grainy to slight abrasive texture; no evident structure; grades to tuffaceous siltstone; any oil indicators masked by obm background. Coal (10505' - 10525') = black; blocky cuttings; moderately hard to hard; crunchy, brittle; shiny luster; overall smooth texture; homogeneous; no outgassing or any other oil indicators. Sand / Sandstone (10530' - 10620') = dark reddish brown to dark grayish brown with blackish hues; unconsolidated to easily friable with trace hard; upper very fine to lower coarse; predominantly upper fine to upper medium; moderate to poor sorting; sub angular to sub rounded; sub spherical to spherical to sub discoidal; grain supported; ashy matrix; dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common but not abundant; dull golden fluorescence across sample; weak white slow streaming to instantaneous cut; no visible cut; weak yellow gold residual fluorescence; no residual visible cut; no odor; no staining. Sand / Sandstone (10620' - 10680') = dark grayish brown with blackish hues to dark reddish brown; unconsolidated to easily friable; predominantly upper fine to upper medium; moderate to poor sorting; sub angular to sub rounded; sub spherical to sub discoidal; grain supported; ashy matrix; dominated by clear to translucent quartz; carbonaceous sediment common but not abundant. GP 22-13RD3 18 Tuffaceous Sandstone ( 10690' - 10785') = light to medium gray, dark yellowish brown; blocky cuttings; overall easily friable; dominant upper fine to upper medium, occasional lower very fine to lower fine; moderately sorted; overall moderate sphericity (subangular to subround); grain-supported with ashy matrix material; dominant quartz, common lithics; 100% dull yellow sample fluorescence with occasional brighter patches (appears to be brighter and more uniform than background obm contamination); instant dull yellowish white cut fluorescence; dark straw visible cut; dull yellow residual cut fluorescence; light brown residual cut; samples appear to be oil stained with possible visible interstitial oil in cracked-open sandstone cuttings. Sand (10795' - 10855') = dominant clear, occasional black, gray; lower fine to upper medium (trace to 3mm), dominant upper fine to lower m edium; moderately sorted; dominant subangular to subround, occasional angular and round; dominant moderate, occasional low and high sphericity; dominant quartz, common miscellaneous lithics; 100% dull yellow sample fluorescence with occasional brighter patches; appears oil stained with some sandstone cuttings with possible interstitial visible oil. Sand (10865' - 10915') = dominant clear, occasional black, gray; lower fine to upper medium, dominant lower medium to upper fine; moderately sorted; dominant subangular to subround, occasional angular; dominant moderate to occasional low sphericity; dominant quartz, common lithics; 100% moderately bright to dull yellow sample fluorescence; appears oil stained with probable dark brown visible interstitial oil in sandstones. Sand (10945' - 11010') = dominant clear, occasional black, gray; dominant lower medium, common upper medium, upper fine, occasional lower fine; moderately sorted; overall subangular to subround with moderate sphericity; dominant quartz, occasional lithics; 100% moderately bright to dull yellow sample fluorescence; instant dull yellowish white cut fluorescence; brown visible cut; light brown residual cut; moderately bright to dull yellow residual cut fluorescence; appears oil stained; occasional probable interstitial visible oil. Sand / Sandstone (11010' - 11120') = very dark blackish brown to very dark brown with dark gray to reddish hues; unconsolidated to trace easily friable; predominantly upper fine to upper medium to occasionally upper very fine; moderate to poor sorting; sub spherical to sub discoidal; sub angular to sub rounded; grain supported; ashy matrix; dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; dull yellow gold sample fluorescence; instant to very slow streaming moderate white cut; light to moderate brown visible cut and residual cut; greenish yellow residual fluorescence; obm and mud product masks any odor, staining and observable free oil in the samples. Sand / Sandstone (11120' - 11230') = dark brown with dark reddish black hues to dark brown with dark gray to reddish hues; unconsolidated to trace easily friable; predominantly lower fine to upper medium to upper very fine; moderate sorting; sub spherical to sub discoidal to spherical; sub angular to sub rounded; grain supported; ashy matrix; non calcareous; overall dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; 100% dull yellowish gold sample fluorescence; instant to very slow streaming moderate white cut; light to moderate brown visible and residual cut; moderate greenish yellow residual fluorescence; obm and mud product masks any odor, staining or observable free oil in the samples. Sand / Sandstone (11230' - 11350') = dark reddish brown with blackish hues to dark brownish gray; unconsolidated; lower medium to lower fine; lower coarse to upper very fine common; moderate to poor sorting; sub spherical to spherical; sub angular to sub rounded to angular; grain supported; ashy matrix; non calcareous; overall dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; 100% dull yellowish gold to trace patchy moderate yellow gold sample fluorescence; instant to very slow streaming moderate white cut; moderate brown visible cut; pale brown to dark straw residual cut; moderate greenish yellow residual fluorescence; obm and mud product masks any odor, staining or observable free oil in the samples. GP 22-13RD3 19 Sand / Sandstone (11350' - 11460') = dark reddish brown to dark gray with dark brown to black hues; unconsolidated; upper medium to lower fine; lower coarse to upper very fine common; moderate to poor sorting; sub angular to sub rounded to angular; sub spherical to spherical; grain supported; ashy matrix; non calcareous; overall dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; 100% dull yellowish gold sample fluorescence; instant blooming, translucent, moderate white cut; moderate brown visible cut; pale brown to dark straw residual cut; moderate greenish yellow residual fluorescence; obm and mud product masks any odor, staining or observable free oil in the samples. Sand / Sandstone (11460' - 11570') = dark gray with dark brown to black hues; dark reddish gray to dark brown; unconsolidated to trace easily friable; lower fine to upper medium; lower coarse to upper very fine common; moderate to poor sorting; sub angular to sub rounded; sub spherical to spherical; grain supported; ashy matrix; non calcareous; overall dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; 100% dull yellowish gold sample fluorescence; instant blooming, translucent, moderate white cut; moderate brown visible cut; pale brown to dark straw residual cut; moderate greenish gold residual fluorescence; obm and mud product masks any odor, staining or observable free oil in the samples. Sand / Sandstone (11575' - 11660') = individual grains dominant clear to occasional black, gray; sandstones overall medium gray to dark yellowish brown; lower very fine to lower medium, rare 2mm; moderately to poorly sorted; subangular to subround; moderate sphericity; sandstone grain packed but with increasing argillaceous matrix accompanied by notable increase of mudrocks; dominant quartz, occasional lithics; 100% dull to moderately bright yellow sample fluorescence; instant dull yellowish white cut fluorescence; brown residual cut; moderately bright to dull yellow residual cut fluorescence; appears oil stained; no visible oil in interstitial porosity in sandstones. Tuffaceous Sandstone (11670' - 11715') = obm-stained dark yellowish brown, when clean is very light gray; soft to moderately firm; mushy to easily friable; lower very fine to lower fine; well to moderately sorted; supported by ashy bentonitic matrix; dominant quartz, occasional lithics; oil: no interstitial oil; no other oil parameters appear to be above obm background contamination. Sand (11725' - 11760') = dominant clear, occasional black, gray; upper very fine to upper fine, dominant lower fine; moderately sorted; angular to subround, dominant subangular; moderate to low sphericity; dominant quartz, occasional miscellaneous lithics; no oil indicators observed above obm background. Tuffaceous Siltstone (11770' - 11820') = dark yellowish brown to medium gray; blocky to "pdc curled" cuttings; very to slightly firm; slightly to easily crumbly; dull luster; finely grainy texture; no evident structure; occasionally to commonly bentonitic and grading to tuffaceous sandstone; also commonly fining down medium to dark gray tuffaceous claystone; no oil observable over obm background. Sand / Sandstone (11830' - 11895') = individual grains dominant clear, occasional black, gray/sandstone is overall dark yellowish brown; lower very fine to upper medium, dominant fine; moderate to poor sorting; angular to subround, dominant subangular; dominant moderate to occasional low sphericity; sandstone grain packed but with copious amounts of argillaceous matrix (occasionally bentonitic) and commonly fining to siltstone; dominant quartz, occasional lithics; no oil indicators observable over obm background. Tuffaceous Claystone / Tuffaceous Siltstone (11900' - 12000') = dark grayish brown to dark medium brown with blackish hues; firm to moderately hard and brittle at times; irregular to bit stacked cuttings habit; silty to clayey texture; dull to slightly waxy luster; moderately hydrophilic; non calcareous; siltstone occasionally grades between silty sandstone sandy siltstone light yellowish brown; soft to easily friable; irregular shaped; uniform very dull yellow/gold sample fluorescence from obm; very weak, very slow translucent dull bluish white cut; no visible cut; very weak greenish gold residual fluorescence; no odor; no staining. GP 22-13RD3 20 Tuffaceous Claystone / Tuffaceous Siltstone (12000' - 12060') = dark grayish brown to dark medium brown with blackish hues; moderate to good induration; semi tough to minor crumbly; irregular to bit stacked cuttings habit; dull to slightly waxy luster; silty to gritty texture; trace deformed carbonaceous banding; trace interbedding with thin sands and ash beds; very dull yellowish gold sample fluorescence from obm; no cut; no odor. Tuffaceous Claystone / Tuffaceous Siltstone (12060' - 12140') = dark brown with reddish hues to dark medium gray with brown to black hues; moderate to good induration; semi tough to minor crumbly or mushy; irregular to planar fracture; bit stacked to tabular to amorphous cuttings habit; dull to earthy to slightly waxy luster; silty to gritty texture; minor quartz rich sands; unconsolidated; trace carbonaceous sediment and banding; very dull yellowish gold sample fluorescence from obm; no cut; no odor. Sandstone / Tuffaceous Sandstone (12145' - 12205') = overall medium gray with brownish hues, occasional light gray; dominant very firm, occasional slightly firm; dominant slightly to occasionally easily friable; ultrafine to lower fine; moderately sorted; grain packed with dominant argillaceous to occasional bentonitic matrix; subangular to well rounded; moderate to high sphericity; occasional carbonaceous banding; dominant quartz, occasional miscellaneous lithics; no oil indicators detectable over obm background. Tuffaceous Siltstone (12220' - 12265') = overall olive gray but with yellowish brown hues; irregular cuttings; hard to slightly firm; moderately tough to easily crumbly; dull luster; grainy texture; occasional carbonaceous and arenaceous/argillaceous banding; fines downward to claystone and coarsens upward to dirty sandstone; no oil signs detected above obm background. Tuffaceous Claystone (12275' - 12320') = overall olive gray but with yellowish brown hues; irregular cuttings; very to slightly firm; slightly to easily crumbly; dull luster; finely grainy to slight abrasive texture; occasional seams of carbonaceous, argillaceous, and arenaceous material; grades evenly to siltstone; no oil indicators observed over obm background contamination. Coal @ 12348' = black; splintery to hackly cuttings; moderately hard but brittle; shiny luster; smooth texture; homogeneous; no observed oil indicators. Sandstone (12375' - 12445') = stained brown by obm, medium to light gray in situ; dominant slightly firm and easily friable, occasional moderately hard and tough; lower very fine to lower medium; subangular to round; moderately sorted; grain packed dominant with moderate amounts of argillaceous matrix that is commonly bentonitic, occasional dense and argillaceous; dominant quartz, occasional lithics; oil: no visible oil staining in cracked-open cuttings but appears to have sample fluorescence and cuts/cut fluorescence elevated above obm background contamination. Tuffaceous Claystone (12455' - 12480') = olive gray to brownish gray; flaky cuttings; moderately firm and crumbly; dull luster; very finely grainy to slight abrasive texture; no evident structure; no observed oil indicators. Tuffaceous Claystone/Sandstone (12480' - 12590') = dark medium gray with reddish brown to black hues dark brown with red and black hues; moderate to good induration; irregular to planar fracture; bit stacked to tabular to amorphous cuttings habit; semi tough to minor crumbly or mushy; dull to earthy to slightly waxy luster; silty to gritty texture; often grades to a siltstone; the sandstones are unconsolidated to easily friable; upper fine to upper medium with lower coarse common; moderate to poor sorting; sub spherical; sub angular to sub rounded to rounded; predominantly clear to translucent quartz; minor carbonaceous sediment and trace banding in the claystones; overall dull yellowish gold sample fluorescence from obm; no cut; no odor. GP 22-13RD3 21 Tuffaceous Claystone/Siltstone (12590' - 12680') = dark medium brown with dark red to black hues to dark medium gray with dark brown hues; moderate to good induration; bit stacked to tabular to amorphous cuttings habit; irregular to planar fracture; semi tough to crumbly to trace mushy; dull to earthy luster; silty to gritty texture; common sandstone throughout the interval; typically unconsolidated to trace easily friable; lower fine to upper medium; moderate sorting; sub spherical; sub angular to sub rounded; quartz dominated; overall dull yellowish gold sample fluorescence from obm; no cut; no odor. Tuffaceous Claystone/Sandstone (12680' - 12770') = dark medium brown with reddish black hues dark gray with brown and black hues; m oderate to good induration; irregular to planar fracture; bit stacked to tabular cuttings habit; semi tough to trace crumbly or mushy; dull to earthy luster; silty to gritty texture; the sandstones are unconsolidated to easily friable; upper fine to upper medium with lower coarse common; moderate to poor sorting; sub spherical; sub angular to sub rounded; grain supported by ashy matrix; clear to translucent quartz; overall dull yellowish gold sample fluorescence from obm; no cut; no odor. Tuffaceous Claystone (12775' - 12800') = olive gray with brownish hues; blocky to flaky cuttings; moderate to very firm; moderately to slightly crumbly; dull luster; very finely grainy texture; no evident structure; no oil indicators. Tuffaceous Siltstone (12810' - 12835') = overall olive gray; amorphous cuttings; soft to slightly firm; mushy to easily crumbly; dull luster; finely grainy texture; no evident structure; grades to tuffaceous claystone; no oil signs. Sand/Sandstone (12845' - 12905') = top of section overall finer with dominant Sandstone/Tuffaceous sandstone, becoming more coarse with depth with loose grains dominant; lower very fine to upper medium dominant with common loose grains to 4mm; poorly to moderately sorted; sandstone dominant matrix supported with dominant clay/silt to common bentonitic matrices, occasionally densely grain packed with calcite cement; dominant quartz, common igneous lithics; no detectable oil indicators. GP 22-13RD3 22 3.3 Sampling Program Set Type and Purpose Interval Frequency Distribution A Washed and Dried Reference 8508’ – 12956’ 30’ Debra Oudean Hilcorp Alaska LLC 3800 Center Point Drive, Suite 100 Anchorage, AK 99508 B Washed and Dried Reference 8508’ – 12956’ 30’ Debra Oudean Hilcorp Alaska LLC 3800 Center Point Drive, Suite 100 Anchorage, AK 99508 GP 22-13RD3 23 4 DRILLING DATA 4.1 Surveys Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 0 0 0 0 0 0 0 0 34 0.39 192 34 -0.11 -0.02 0.03 1.15 54 0.40 198 54 -0.25 -0.06 0.05 0.21 74 0.32 213 74 -0.36 -0.11 0.06 0.61 94 0.16 219 94 -0.43 -0.16 0.04 0.81 114 0.12 227 114 -0.46 -0.19 0.03 0.22 134 0.11 244 134 -0.49 -0.23 0.01 0.18 154 0.12 266 154 -0.50 -0.26 -0.02 0.22 174 0.16 276 174 -0.50 -0.31 -0.06 0.23 194 0.23 274 194 -0.49 -0.38 -0.13 0.35 214 0.35 272 214 -0.48 -0.48 -0.22 0.60 234 0.50 268 234 -0.49 -0.63 -0.35 0.76 254 0.65 263 254 -0.50 -0.83 -0.52 0.79 274 0.71 261 274 -0.54 -1.06 -0.72 0.32 294 0.70 262 293.99 -0.57 -1.31 -0.92 0.08 314 0.55 266 313.99 -0.60 -1.52 -1.11 0.78 334 0.32 294 333.99 -0.58 -1.67 -1.25 1.53 354 0.53 125 353.99 -0.61 -1.65 -1.21 4.23 374 1.59 42 373.99 -0.46 -1.38 -1.04 8.07 394 3.11 49 393.97 0.11 -0.79 -0.76 7.72 414 4.96 52 413.92 0.99 0.30 -0.16 9.31 434 6.35 53 433.82 2.19 1.87 0.72 6.97 454 6.87 53 453.69 3.58 3.70 1.76 2.6 474 7.01 53 473.54 5.03 5.63 2.86 0.70 494 7.03 53 493.39 6.50 7.59 3.97 0.10 514 7.11 54 513.24 7.97 9.57 5.11 0.73 534 7.16 54 533.09 9.43 11.58 6.27 0.25 554 7.15 54 552.93 10.89 13.59 7.44 0.05 574 7.12 55 572.78 12.33 15.61 8.63 0.64 594 7.03 55 592.62 13.75 17.63 9.82 0.45 614 7.01 56 612.47 15.13 19.65 11.02 0.62 634 6.83 56 632.33 16.48 21.64 12.23 0.90 654 6.74 56 652.19 17.80 23.60 13.41 0.45 GP 22-13RD3 24 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 674 6.71 56 672.05 19.11 25.54 14.58 0.15 694 6.51 56 691.92 20.40 27.45 15.73 1.00 714 6.23 56 711.79 21.64 29.29 16.84 1.40 734 6.06 55 731.68 22.85 31.06 17.90 1.00 754 5.85 55 751.57 24.04 32.76 18.90 1.05 774 5.70 54 771.47 25.21 34.39 19.86 0.90 794 5.46 54 791.37 26.35 35.97 20.78 1.20 814 5.29 53 811.29 27.47 37.47 21.64 0.97 834 5.11 53 831.20 28.56 38.92 22.46 0.90 854 4.96 52 851.13 29.63 40.31 23.25 0.87 874 4.84 52 871.05 30.68 41.66 24.00 0.60 894 4.77 51 890.98 31.72 42.97 24.72 0.55 914 4.75 50 910.92 32.78 44.25 25.41 0.43 934 4.66 49 930.85 33.84 45.50 26.06 0.61 954 4.62 48 950.78 34.91 46.71 26.68 0.45 974 4.62 48 970.72 35.99 47.91 27.28 0.00 994 4.64 48 990.65 37.07 49.11 27.89 0.10 1014 4.66 48 1010.59 38.16 50.31 28.49 0.10 1034 4.68 48 1030.52 39.25 51.52 29.10 0.10 1054 4.70 49 1050.45 40.33 52.75 29.73 0.42 1074 4.71 49 1070.39 41.40 53.99 30.37 0.05 1094 4.71 50 1090.32 42.47 55.23 31.03 0.41 1114 4.76 50 1110.25 43.53 56.50 31.70 0.25 1134 4.76 50 1130.18 44.60 57.77 32.37 0.00 1154 4.78 50 1150.11 45.67 59.04 33.05 0.10 1174 4.80 50 1170.04 46.74 60.32 33.73 0.10 1194 4.80 50 1189.97 47.82 61.61 34.41 0.00 1214 4.83 50 1209.90 48.90 62.89 35.09 0.15 1234 4.85 50 1229.83 49.98 64.18 35.78 0.10 1254 4.83 50 1249.76 51.07 65.48 36.46 0.10 1274 4.84 50 1269.69 52.15 66.77 37.15 0.05 1294 4.84 50 1289.62 53.23 68.06 37.84 0.00 1314 4.87 50 1309.54 54.32 69.36 38.53 0.15 1334 4.87 50 1329.47 55.41 70.66 39.22 0.00 1354 4.86 50 1349.40 56.50 71.96 39.91 0.05 1374 4.86 51 1369.33 57.58 73.27 40.61 0.42 1394 4.87 51 1389.26 58.65 74.58 41.33 0.05 1414 4.89 51 1409.18 59.72 75.91 42.04 0.10 1434 4.89 51 1429.11 60.79 77.23 42.76 0.00 GP 22-13RD3 25 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 1454 4.90 51 1449.04 61.87 78.56 43.49 0.05 1474 4.89 51 1468.96 62.94 79.88 44.21 0.05 1494 4.93 51 1488.89 64.02 81.21 44.93 0.20 1514 4.92 51 1508.82 65.10 82.55 45.66 0.05 1534 4.95 51 1528.74 66.18 83.89 46.38 0.15 1554 4.92 51 1548.67 67.26 85.22 47.11 0.15 1574 4.94 51 1568.59 68.35 86.56 47.84 0.10 1594 4.95 51 1588.52 69.43 87.90 48.57 0.05 1614 4.98 51 1608.45 70.52 89.24 49.30 0.15 1634 4.97 51 1628.37 71.61 90.59 50.03 0.05 1654 4.97 51 1648.29 72.70 91.94 50.76 0.00 1674 4.97 51 1668.22 73.79 93.28 51.49 0.00 1694 5.02 51 1688.14 74.89 94.64 52.23 0.25 1714 5.00 51 1708.07 75.99 95.99 52.97 0.10 1734 5.01 51 1727.99 77.09 97.35 53.71 0.05 1754 5.04 51 1747.91 78.19 98.71 54.45 0.15 1774 5.06 51 1767.84 79.30 100.08 55.19 0.10 1794 5.09 51 1787.76 80.41 101.46 55.94 0.15 1814 5.11 51 1807.68 81.53 102.84 56.69 0.10 1834 5.09 51 1827.60 82.65 104.22 57.44 0.10 1854 5.12 51 1847.52 83.77 105.60 58.19 0.15 1874 5.07 50 1867.44 84.90 106.97 58.93 0.51 1894 5.11 51 1887.36 86.03 108.34 59.67 0.49 1914 5.16 51 1907.28 87.15 109.73 60.42 0.25 1934 5.15 50 1927.20 88.29 111.12 61.17 0.45 1954 5.17 50 1947.12 89.45 112.50 61.90 0.10 1974 5.24 50 1967.04 90.62 113.89 62.64 0.35 1994 5.19 50 1986.96 91.79 115.28 63.38 0.25 2014 5.22 50 2006.87 92.95 116.67 64.11 0.15 2034 5.20 50 2026.79 94.12 118.06 64.85 0.10 2054 5.26 50 2046.71 95.29 119.46 65.59 0.30 2074 5.24 50 2066.62 96.47 120.86 66.34 0.10 2094 5.27 50 2086.54 97.65 122.26 67.08 0.15 2114 5.26 49 2106.45 98.84 123.66 67.82 0.46 2134 5.29 50 2126.37 100.03 125.06 68.55 0.48 2154 5.32 50 2146.28 101.22 126.47 69.30 0.15 2174 5.32 50 2166.20 102.41 127.89 70.05 0.00 2194 5.32 49 2186.11 103.62 129.30 70.79 0.46 2214 5.35 50 2206.03 104.82 130.72 71.54 0.49 GP 22-13RD3 26 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 2234 5.32 50 2225.94 106.02 132.14 72.29 0.15 2254 5.30 50 2245.85 107.21 133.56 73.05 0.10 2274 5.28 50 2265.77 108.39 134.97 73.80 0.10 2294 5.31 50 2285.68 109.58 136.39 74.55 0.15 2314 5.35 50 2305.60 110.77 137.81 75.30 0.20 2334 5.36 50 2325.51 111.97 139.24 76.06 0.05 2354 5.34 50 2345.42 113.17 140.67 76.82 0.10 2374 5.35 50 2365.33 114.37 142.09 77.58 0.05 2394 5.37 50 2385.25 115.57 143.53 78.34 0.10 2414 5.39 50 2405.16 116.78 144.96 79.10 0.10 2434 5.42 50 2425.07 117.99 146.41 79.87 0.15 2454 5.45 50 2444.98 119.21 147.86 80.64 0.15 2474 5.42 50 2464.89 120.42 149.31 81.41 0.15 2494 5.42 50 2484.80 121.64 150.75 82.18 0.00 2514 5.44 50 2504.71 122.85 152.20 82.94 0.10 2534 5.47 50 2524.62 124.08 153.66 83.72 0.15 2554 5.47 50 2544.53 125.30 155.12 84.49 0.00 2574 5.45 50 2564.44 126.52 156.58 85.27 0.10 2594 5.46 50 2584.35 127.75 158.04 86.04 0.05 2614 5.49 50 2604.26 128.97 159.50 86.82 0.15 2634 5.48 50 2624.17 130.20 160.96 87.59 0.05 2654 5.48 50 2644.07 131.43 162.42 88.37 0.00 2674 5.50 50 2663.98 132.66 163.89 89.15 0.10 2694 5.50 50 2683.89 133.89 165.36 89.93 0.00 2714 5.49 49 2703.80 135.14 166.82 90.69 0.48 2734 5.50 50 2723.71 136.38 168.27 91.46 0.48 2754 5.51 49 2743.61 137.63 169.73 92.22 0.48 2774 5.53 49 2763.52 138.89 171.18 92.97 0.10 2794 5.52 49 2783.43 140.15 172.64 93.73 0.05 2814 5.55 49 2803.33 141.42 174.09 94.48 0.15 2834 5.53 49 2823.24 142.68 175.55 95.23 0.10 2854 5.53 49 2843.15 143.95 177.00 95.99 0.00 2874 5.47 50 2863.06 145.19 178.46 96.75 0.57 2894 5.49 50 2882.96 146.42 179.92 97.53 0.10 2914 5.46 50 2902.87 147.65 181.39 98.30 0.15 2934 5.46 50 2922.78 148.87 182.84 99.08 0.00 2954 5.50 51 2942.69 150.08 184.32 99.87 0.52 2974 5.48 50 2962.60 151.30 185.79 100.66 0.49 2994 5.46 50 2982.51 152.53 187.25 101.44 0.10 GP 22-13RD3 27 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 3014 5.45 50 3002.42 153.75 188.71 102.21 0.05 3034 5.46 50 3022.33 154.97 190.17 102.99 0.05 3054 5.48 50 3042.24 156.20 191.63 103.76 0.10 3074 5.42 50 3062.15 157.42 193.08 104.53 0.30 3094 5.46 50 3082.06 158.64 194.54 105.31 0.20 3114 5.44 51 3101.97 159.85 196.00 106.09 0.49 3134 5.43 50 3121.88 161.05 197.46 106.88 0.48 3154 5.43 50 3141.79 162.27 198.91 107.65 0.00 3174 5.43 51 3161.70 163.47 200.37 108.43 0.47 3194 5.34 51 3181.61 164.65 201.83 109.23 0.45 3214 5.33 51 3201.52 165.82 203.28 110.01 0.05 3234 5.33 52 3221.43 166.98 204.73 110.81 0.46 3254 5.36 52 3241.35 168.13 206.20 111.63 0.15 3274 5.33 52 3261.26 169.27 207.67 112.45 0.15 3294 5.30 53 3281.17 170.40 209.14 113.27 0.49 3314 5.30 53 3301.09 171.51 210.61 114.11 0.00 3334 5.32 53 3321.00 172.63 212.09 114.95 0.10 3354 5.34 53 3340.92 173.74 213.57 115.79 0.10 3374 5.26 53 3360.83 174.86 215.05 116.63 0.40 3394 5.23 53 3380.75 175.96 216.51 117.46 0.15 3414 5.21 53 3400.66 177.05 217.96 118.29 0.10 3434 5.26 53 3420.58 178.15 219.42 119.12 0.25 3454 5.24 54 3440.50 179.24 220.89 119.96 0.47 3474 5.25 54 3460.41 180.31 222.37 120.82 0.05 3494 5.24 54 3480.33 181.39 223.85 121.68 0.05 3514 5.20 54 3500.25 182.46 225.32 122.53 0.20 3534 5.16 54 3520.17 183.52 226.78 123.38 0.20 3554 5.17 54 3540.08 184.58 228.24 124.23 0.05 3574 5.16 54 3560.00 185.63 229.70 125.07 0.05 3594 5.17 54 3579.92 186.69 231.15 125.92 0.05 3614 5.18 55 3599.84 187.74 232.62 126.78 0.45 3634 5.13 55 3619.76 188.77 234.09 127.65 0.25 3654 5.13 55 3639.68 189.80 235.56 128.52 0.00 3674 5.10 55 3659.60 190.82 237.02 129.38 0.15 3694 5.07 55 3679.52 191.84 238.47 130.24 0.15 3714 5.08 55 3699.44 192.85 239.92 131.10 0.05 3734 5.04 55 3719.36 193.86 241.36 131.95 0.20 3754 4.97 55 3739.29 194.86 242.79 132.80 0.35 3774 4.96 54 3759.21 195.87 244.20 133.62 0.44 GP 22-13RD3 28 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 3794 4.89 54 3779.14 196.88 245.59 134.43 0.35 3814 4.89 53 3799.07 197.89 246.96 135.22 0.43 3834 4.87 53 3818.99 198.92 248.32 135.99 0.10 3854 4.86 52 3838.92 199.95 249.67 136.75 0.43 3874 4.89 52 3858.85 200.99 251.01 137.49 0.15 3894 4.89 52 3878.78 202.04 252.35 138.24 0.00 3914 4.83 52 3898.70 203.09 253.68 138.98 0.30 3934 4.78 51 3918.63 204.13 255.00 139.70 0.49 3954 4.78 51 3938.57 205.18 256.29 140.41 0.00 3974 4.72 50 3958.50 206.23 257.57 141.09 0.51 3994 4.68 50 3978.43 207.29 258.82 141.76 0.20 4014 4.63 49 3998.36 208.34 260.06 142.41 0.48 4034 4.72 47 4018.30 209.43 261.27 143.02 0.93 4054 4.82 49 4038.23 210.54 262.51 143.64 0.97 4074 4.86 49 4058.16 211.65 263.78 144.30 0.20 4094 4.85 50 4078.08 212.75 265.07 144.98 0.43 4114 4.91 52 4098.01 213.82 266.39 145.70 0.90 4134 5.00 53 4117.94 214.87 267.76 146.47 0.62 4154 5.08 55 4137.86 215.90 269.18 147.29 0.97 4174 5.08 58 4157.78 216.88 270.66 148.19 1.33 4194 4.94 60 4177.71 217.78 272.15 149.14 1.12 4214 4.66 62 4197.63 218.59 273.62 150.10 1.63 4234 4.47 67 4217.57 219.28 275.05 151.09 2.20 4254 4.39 68 4237.51 219.87 276.48 152.11 0.56 4274 4.40 69 4257.45 220.43 277.90 153.15 0.39 4294 4.38 70 4277.39 220.97 279.34 154.20 0.40 4314 4.50 71 4297.33 221.48 280.80 155.29 0.71 4334 4.44 71 4317.27 221.99 282.27 156.39 0.30 4354 4.37 71 4337.21 222.49 283.72 157.48 0.35 4374 4.36 71 4357.16 222.99 285.16 158.55 0.05 4394 4.36 71 4377.10 223.48 286.60 159.63 0.00 4414 4.36 72 4397.04 223.97 288.04 160.71 0.38 4434 4.29 72 4416.98 224.43 289.48 161.80 0.35 4454 4.37 72 4436.93 224.90 290.91 162.88 0.40 4474 4.47 72 4456.87 225.37 292.38 163.99 0.50 4494 4.43 72 4476.81 225.85 293.85 165.11 0.20 4514 4.28 72 4496.75 226.32 295.30 166.20 0.75 4534 4.33 72 4516.69 226.79 296.73 167.28 0.25 4554 4.22 72 4536.64 227.25 298.14 168.35 0.55 GP 22-13RD3 29 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 4574 4.15 72 4556.58 227.70 299.53 169.40 0.35 4594 4.22 71 4576.53 228.16 300.92 170.44 0.51 4614 4.19 71 4596.48 228.64 302.30 171.48 0.15 4634 4.24 72 4616.42 229.11 303.70 172.53 0.44 4654 4.14 71 4636.37 229.57 305.08 173.57 0.62 4674 4.03 70 4656.32 230.04 306.43 174.57 0.66 4694 4.07 71 4676.27 230.52 307.76 175.56 0.41 4714 4.28 71 4696.21 230.99 309.13 176.59 1.05 4734 4.29 72 4716.16 231.46 310.55 177.65 0.38 4754 4.22 72 4736.10 231.92 311.96 178.72 0.35 4774 4.03 72 4756.05 232.37 313.33 179.76 0.95 4794 3.97 71 4776.00 232.81 314.65 180.75 0.46 4814 3.96 71 4795.96 233.26 315.96 181.73 0.05 4834 4.09 69 4815.91 233.74 317.28 182.70 0.96 4854 3.97 68 4835.86 234.26 318.59 183.65 0.70 4874 3.81 69 4855.81 234.75 319.85 184.57 0.87 4894 3.83 70 4875.77 235.22 321.10 185.49 0.35 4914 3.90 70 4895.72 235.68 322.37 186.42 0.35 4934 3.87 69 4915.67 236.16 323.63 187.36 0.37 4954 3.92 68 4935.63 236.65 324.90 188.28 0.42 4974 3.87 68 4955.58 237.16 326.16 189.18 0.25 4994 3.89 68 4975.54 237.67 327.41 190.09 0.10 5014 3.80 69 4995.49 238.16 328.66 191.00 0.56 5034 3.80 68 5015.45 238.65 329.89 191.89 0.33 5054 3.98 67 5035.40 239.17 331.15 192.79 0.96 5074 3.95 66 5055.35 239.72 332.42 193.69 0.38 5094 3.94 66 5075.31 240.28 333.67 194.57 0.05 5114 3.95 65 5095.26 240.85 334.92 195.45 0.35 5134 3.97 66 5115.21 241.42 336.18 196.33 0.36 5154 4.00 66 5135.16 241.99 337.45 197.22 0.15 5174 3.96 66 5155.11 242.55 338.72 198.11 0.20 5194 4.05 68 5175.07 243.10 340.00 199.03 0.83 5214 4.14 68 5195.01 243.63 341.33 199.98 0.45 5234 4.10 68 5214.96 244.17 342.66 200.95 0.20 5254 4.08 68 5234.91 244.70 343.98 201.90 0.10 5274 4.09 68 5254.86 245.24 345.31 202.85 0.05 5294 4.15 68 5274.81 245.78 346.64 203.81 0.30 5314 4.03 68 5294.76 246.31 347.96 204.77 0.60 5334 3.92 66 5314.71 246.85 349.24 205.68 0.88 GP 22-13RD3 30 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 5354 3.85 65 5334.66 247.41 350.47 206.54 0.49 5374 3.85 64 5354.62 247.99 351.68 207.38 0.34 5394 4.00 62 5374.57 248.61 352.90 208.20 1.02 5414 3.91 61 5394.52 249.27 354.11 209.00 0.57 5434 3.99 61 5414.48 249.94 355.32 209.79 0.40 5454 4.10 62 5434.43 250.61 356.56 210.61 0.65 5474 4.04 63 5454.38 251.27 357.82 211.46 0.46 5494 4.02 60 5474.33 251.94 359.05 212.27 1.06 5514 4.08 61 5494.28 252.63 360.28 213.07 0.46 5534 3.95 61 5514.23 253.31 361.51 213.87 0.65 5554 3.83 58 5534.18 254.00 362.67 214.62 1.18 5574 3.80 57 5554.14 254.71 363.80 215.32 0.36 5594 3.80 56 5574.09 255.45 364.90 215.99 0.33 5614 3.81 55 5594.05 256.20 366.00 216.65 0.34 5634 3.81 54 5614.01 256.97 367.08 217.28 0.33 5654 3.82 54 5633.96 257.75 368.15 217.90 0.05 5674 3.79 53 5653.92 258.54 369.22 218.52 0.36 5694 3.79 52 5673.87 259.35 370.27 219.11 0.33 5714 3.78 50 5693.83 260.18 371.30 219.66 0.66 5734 3.83 50 5713.79 261.03 372.31 220.20 0.25 5754 3.85 50 5733.74 261.89 373.34 220.75 0.10 5774 3.82 50 5753.70 262.75 374.36 221.29 0.15 5794 3.90 48 5773.65 263.63 375.38 221.82 0.78 5814 4.14 48 5793.60 264.57 376.42 222.34 1.20 5834 4.49 50 5813.54 265.56 377.56 222.93 1.90 5854 5.24 54 5833.47 266.60 378.90 223.68 4.11 5874 6.39 57 5853.37 267.74 380.57 224.68 5.95 5894 7.55 59 5873.22 269.02 382.63 225.97 5.92 5914 8.19 60 5893.03 270.41 384.99 227.48 3.27 5934 8.35 60 5912.83 271.85 387.48 229.09 0.80 5954 8.39 61 5932.61 273.29 390.01 230.74 0.75 5974 8.41 61 5952.40 274.70 392.57 232.42 0.10 5994 8.41 61 5972.18 276.12 395.13 234.09 0.00 6014 8.52 61 5991.96 277.55 397.70 235.78 0.55 6034 8.68 61 6011.74 279.00 400.32 237.50 0.80 6054 8.67 61 6031.51 280.46 402.96 239.23 0.05 6074 8.61 62 6051.28 281.89 405.60 240.97 0.81 6094 8.55 62 6071.06 283.29 408.23 242.73 0.30 6114 8.45 62 6090.84 284.68 410.84 244.47 0.50 GP 22-13RD3 31 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 6134 8.34 62 6110.63 286.05 413.42 246.18 0.55 6154 8.30 62 6130.42 287.41 415.97 247.88 0.20 6174 8.16 62 6150.21 288.76 418.50 249.57 0.70 6194 8.03 62 6170.01 290.08 420.99 251.22 0.65 6214 7.99 61 6189.82 291.41 423.44 252.84 0.72 6234 7.89 61 6209.62 292.75 425.85 254.42 0.50 6254 7.64 61 6229.44 294.06 428.22 255.97 1.25 6274 7.40 60 6249.27 295.35 430.50 257.46 1.37 6294 7.38 60 6269.10 296.63 432.72 258.89 0.10 6314 7.25 60 6288.94 297.90 434.93 260.32 0.65 6334 6.94 60 6308.79 299.14 437.07 261.70 1.55 6354 6.77 58 6328.64 300.37 439.11 263.00 1.47 6374 6.78 58 6348.50 301.62 441.12 264.25 0.05 6394 6.67 58 6368.37 302.86 443.10 265.49 0.55 6414 6.49 57 6388.23 304.09 445.03 266.69 1.07 6434 6.44 56 6408.11 305.33 446.91 267.83 0.62 6454 6.32 56 6427.98 306.58 448.75 268.94 0.60 6474 6.22 56 6447.86 307.80 450.57 270.04 0.50 6494 5.95 55 6467.75 309.00 452.31 271.08 1.45 6514 5.73 54 6487.65 310.18 453.97 272.05 1.21 6534 5.69 54 6507.55 311.35 455.58 272.99 0.20 6554 5.64 53 6527.45 312.52 457.17 273.90 0.55 6574 5.47 53 6547.36 313.69 458.71 274.78 0.85 6594 5.35 52 6567.27 314.84 460.21 275.62 0.76 6614 5.23 51 6587.18 315.98 461.65 276.41 0.76 6634 5.14 49 6607.10 317.15 463.04 277.15 1.01 6654 5.07 49 6627.02 318.31 464.38 277.84 0.35 6752 9.34 71.72 6724.24 323.65 475.21 285.23 5.16 6846 12.40 75.27 6816.55 328.61 492.21 298.34 3.33 6941 15.00 78.05 6908.84 333.75 514.11 315.77 2.82 7035 17.09 75.81 6999.17 339.66 539.40 335.92 2.32 7128 19.82 79.10 7087.38 345.99 568.14 358.97 3.14 7221 22.08 82.87 7174.23 351.14 600.97 386.22 2.83 7315 23.96 85.84 7260.75 354.72 637.54 417.52 2.35 7410 25.90 86.14 7346.89 357.52 677.49 452.20 2.05 7503 28.00 89.35 7429.79 359.13 719.59 489.33 2.75 7598 30.61 91.52 7512.63 358.74 766.08 531.28 2.97 7691 33.90 92.28 7591.27 357.08 815.67 576.59 3.56 7784 36.62 92.30 7667.20 354.94 869.31 625.74 2.92 GP 22-13RD3 32 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 7880 40.42 92.38 7742.29 352.49 929.04 680.49 3.96 7975 42.53 93.07 7813.47 349.50 991.88 738.29 2.27 8071 45.23 92.27 7882.66 346.41 1058.35 799.38 2.87 8166 48.14 92.52 7947.82 343.52 1127.40 862.71 3.07 8261 50.50 91.41 8009.74 341.06 1199.39 928.50 2.64 8356 52.75 91.13 8068.72 339.41 1273.85 996.14 2.38 8451 53.71 92.27 8125.58 337.15 1349.91 1065.49 1.39 8495 54.19 92.54 8151.48 335.66 1385.45 1098.09 1.20 8579 54.78 96.06 8200.29 330.52 1453.61 1161.61 3.48 8641.49 51.53 98.77 8237.76 324.09 1503.19 1208.98 6.25 8702.58 47.92 104.87 8277.27 314.62 1548.78 1254.11 9.63 8765.67 45.07 110.87 8320.72 300.65 1592.30 1299.36 8.25 8826.06 42.12 116.12 8364.46 284.10 1630.48 1340.92 7.72 8889.06 40.30 119.00 8411.86 264.92 1667.27 1382.40 4.18 8950.16 39.20 122.99 8458.85 244.82 1700.75 1421.30 4.55 9013.48 37.37 127.26 8508.55 222.29 1732.84 1460.02 5.08 9073.40 34.45 130.43 8557.08 200.28 1760.22 1494.28 5.78 9134.98 32.57 135.79 8608.44 177.09 1785.04 1526.76 5.68 9197.08 30.36 140.88 8661.41 152.93 1806.61 1556.73 5.57 9261.88 29.71 146.20 8717.52 126.88 1825.87 1585.47 4.23 9322.31 32.79 150.33 8769.19 100.20 1842.31 1611.93 6.22 9383.34 32.83 153.63 8820.48 71.02 1857.84 1638.68 2.92 9446.23 32.09 156.27 8873.55 40.45 1872.13 1664.93 2.54 9507.48 30.43 154.64 8925.91 11.54 1885.33 1689.46 3.04 9569.06 31.74 151.33 8978.65 -16.76 1899.78 1714.86 3.50 9630.87 31.78 145.27 9031.22 -44.41 1916.86 1742.33 5.17 9692.26 31.10 138.77 9083.61 -69.63 1936.52 1771.06 5.63 9754.53 32.45 136.34 9136.54 -93.82 1958.66 1801.56 2.99 9816.60 32.33 138.39 9188.96 -118.27 1981.18 1832.52 1.78 9878.68 33.37 140.57 9241.12 -143.87 2003.05 1863.40 2.54 9941.04 33.80 144.93 9293.07 -171.32 2023.91 1894.18 3.93 10002.79 30.85 143.54 9345.25 -198.12 2043.19 1923.26 4.93 10064.52 29.66 138.04 9398.58 -222.21 2062.81 1951.46 4.89 10125.62 31.29 134.65 9451.24 -244.61 2084.22 1980.51 3.88 10187.18 32.87 135.68 9503.39 -267.80 2107.27 2011.39 2.72 10249.43 33.91 140.96 9555.38 -293.38 2130.01 2043.05 4.95 10311.48 35.33 145.34 9606.45 -321.58 2151.12 2074.38 4.62 10375.01 34.54 148.33 9658.54 -352.02 2171.02 2105.62 2.96 10436.85 33.69 148.47 9709.74 -381.56 2189.20 2134.90 1.38 GP 22-13RD3 33 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 10498.73 31.73 145.58 9761.80 -409.62 2207.37 2163.54 4.05 10563.03 32.61 143.53 9816.23 -437.50 2227.23 2193.61 2.18 10623.67 35.00 143.32 9866.62 -464.59 2247.33 2223.55 3.95 10682.96 36.60 142.71 9914.70 -492.29 2268.20 2254.45 2.75 10748.79 38.70 140.32 9966.83 -523.74 2293.23 2290.74 3.89 10810.72 41.96 138.86 10014.03 -554.25 2319.22 2327.47 5.49 10872.35 45.89 135.96 10058.42 -585.68 2348.17 2367.27 7.15 10933.92 50.01 134.11 10099.65 -618.01 2380.48 2410.48 7.06 10996.37 54.10 131.75 10138.04 -651.52 2416.55 2457.59 7.20 11059.56 57.89 130.28 10173.38 -685.88 2456.08 2508.18 6.29 11123.26 62.83 128.02 10204.88 -720.79 2499.02 2562.08 8.35 11184.44 67.64 129.34 10230.50 -755.51 2542.36 2616.25 8.11 11246.49 68.65 127.75 10253.60 -791.39 2587.40 2672.47 2.88 11309.06 65.58 125.57 10277.93 -825.82 2633.63 2729.10 5.88 11371.15 65.57 125.42 10303.60 -858.64 2679.66 2784.86 0.22 11433.25 64.32 125.46 10329.90 -891.26 2725.49 2840.36 2.00 11496.56 63.38 126.36 10357.80 -924.59 2771.52 2896.34 1.95 11557.97 62.79 126.99 10385.60 -957.29 2815.44 2950.15 1.33 11620.84 63.36 128.95 10414.07 -991.78 2859.63 3004.98 2.92 11682.27 63.21 131.16 10441.69 -1027.09 2901.62 3058.21 3.23 PULL BACK FOR OPEN HOLE SIDETRACK 10748.79 38.70 140.32 9966.83 -523.74 2293.23 2290.74 3.89 10810.68 38.36 143.26 10015.25 -554.02 2317.08 2330.22 3.01 10872.02 40.18 138.85 10062.75 -584.18 2341.49 2365.23 5.43 10928.95 43.32 136.51 10105.22 -612.19 2367.02 2400.32 6.17 10997.26 45.46 132.79 10154.04 -645.73 2401.02 2445.44 4.93 11057.58 47.89 131.80 10195.43 -675.26 2433.48 2487.43 4.21 11120.29 51.70 130.39 10235.90 -706.72 2469.58 2533.55 6.31 11183.41 54.05 129.85 10273.99 -739.14 2508.06 2582.24 3.78 11246.80 58.13 129.82 10309.35 -772.83 2548.45 2633.19 6.43 11309.99 59.71 129.94 10341.98 -807.53 2589.98 2685.60 2.50 11371.48 59.93 128.54 10372.89 -841.15 2631.15 2737.22 2.01 11433.17 59.87 129.22 10403.83 -874.65 2672.70 2789.14 0.96 11494.87 60.64 130.86 10434.44 -909.12 2713.71 2840.98 2.63 11556.87 59.70 131.47 10465.28 -944.52 2754.20 2892.75 1.73 11619.21 59.50 133.24 10496.83 -980.74 2793.93 2944.20 2.47 11681.61 60.01 134.78 10528.26 -1018.19 2832.70 2995.30 2.28 11743.63 61.13 133.58 10558.73 -1055.83 2871.44 3046.46 2.46 11805.71 62.60 132.88 10588.00 -1093.32 2911.33 3098.59 2.58 GP 22-13RD3 34 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 11867.91 63.14 132.99 10616.37 -1131.03 2951.86 3151.40 0.88 11929.68 62.59 133.62 10644.54 -1168.73 2991.86 3203.72 1.27 11991.00 63.30 132.07 10672.43 -1205.86 3031.90 3255.84 2.53 12053.54 63.09 128.97 10700.63 -1242.13 3074.32 3309.73 4.43 12114.96 64.48 127.92 10727.77 -1276.39 3117.48 3363.42 2.73 12176.72 65.55 128.20 10753.86 -1310.90 3161.55 3418.05 1.77 12239.03 65.70 128.22 10779.57 -1346.01 3206.15 3473.41 0.26 PULL BACK FOR CEMENT PLUG SIDETRACK 10100.00 30.62 135.98 9429.26 -235.24 2074.97 1974.11 3.96 10125.65 30.91 135.52 9451.30 -244.64 2084.12 1986.41 1.44 10188.80 29.38 133.36 9505.91 -266.84 2106.75 2016.40 2.96 10249.73 31.74 131.16 9558.38 -287.66 2129.68 2046.06 4.28 10312.12 34.59 130.70 9610.60 -310.01 2155.47 2078.96 4.59 10374.15 36.28 130.32 9661.14 -333.37 2182.81 2113.69 2.75 10437.31 39.04 130.29 9711.13 -358.33 2212.23 2151.00 4.36 10503.39 40.28 127.21 9762.01 -384.71 2245.13 2192.04 3.52 10568.40 43.69 128.33 9810.33 -411.35 2279.49 2234.52 5.37 10627.97 47.94 133.86 9851.85 -439.45 2311.60 2275.61 9.76 10694.38 56.29 137.31 9892.60 -476.91 2348.18 2324.75 13.22 10755.02 61.15 138.27 9924.08 -515.29 2382.98 2372.68 8.13 10814.44 64.87 140.45 9951.04 -555.47 2417.44 2421.08 7.05 10877.84 65.89 138.25 9977.46 -599.19 2454.99 2473.80 3.54 10939.91 67.10 137.06 10002.21 -641.26 2493.33 2526.51 2.62 11002.11 67.84 133.75 10026.05 -682.16 2533.67 2580.53 5.06 11066.82 67.45 130.33 10050.67 -722.23 2578.10 2637.89 4.92 11127.70 66.59 128.61 10074.44 -757.85 2621.37 2692.27 2.96 11190.71 63.94 127.01 10100.80 -792.94 2666.57 2748.18 4.80 11252.51 63.92 127.77 10127.96 -826.65 2710.67 2802.5 1.11 11316.11 63.85 128.28 10155.96 -861.83 2755.66 2858.25 0.73 11376.69 64.05 129.66 10182.56 -896.06 2797.97 2911.17 2.07 11437.89 64.47 130.37 10209.14 -931.51 2840.19 2964.54 1.24 11499.97 64.94 130.06 10235.67 -967.75 2883.05 3018.82 0.88 11564.44 65.37 130.46 10262.76 -1005.56 2927.69 3075.39 0.88 11625.50 61.01 128.91 10290.29 -1040.36 2969.61 3128.21 7.49 11687.50 60.84 128.04 10320.42 -1074.07 3012.03 3181.02 1.25 11750.57 60.72 127.68 10351.21 -1107.86 3055.49 3234.78 0.54 11811.67 59.30 129.62 10381.75 -1140.90 3096.82 3286.31 3.61 11873.58 57.92 129.95 10414.00 -1174.71 3137.43 3337.52 2.27 11935.83 57.48 128.31 10447.26 -1207.92 3178.24 3388.66 2.33 GP 22-13RD3 35 Measured Depth (ft) Incl. (o) Azim. (o) True Vertical Depth (ft) Latitude (ft) N(+), S(-) Departure (ft) E(+), W(-) Vertical Section (Incr) (ft) Dogleg Rate (o/100ft) 11999.46 56.51 130.56 10481.93 -1241.8 3219.46 3440.44 3.35 12059.57 58.20 133.18 10514.36 -1275.59 3257.13 3488.99 4.63 12122.31 63.71 136.30 10544.81 -1314.20 3296.04 3540.74 9.80 12184.02 68.65 138.49 10569.73 -1355.75 3334.22 3593.09 8.63 12245.83 69.63 137.45 10591.74 -1398.66 3372.89 3646.46 2.23 12307.39 73.99 138.71 10610.95 -1442.17 3411.95 3700.44 7.34 12368.91 75.33 139.54 10627.23 -1487.02 3450.77 3754.8 2.54 12431.89 76.93 140.17 10642.33 -1533.76 3490.19 3810.5 2.73 12494.40 77.43 139.70 10656.20 -1580.41 3529.42 3865.99 1.09 12555.68 77.30 136.91 10669.61 -1625.06 3569.19 3921.10 4.46 12618.02 74.25 134.81 10684.93 -1668.42 3611.26 3977.74 5.88 12677.61 72.89 134.26 10701.78 -1708.50 3652.00 4031.77 2.44 12739.50 77.43 136.81 10717.63 -1751.19 3693.88 4087.95 8.34 12801.01 81.94 137.82 10728.64 -1795.67 3734.90 4144.12 7.52 12866.27 83.69 138.09 10736.80 -1843.75 3778.26 4203.96 2.71 12911.59 84.56 139.17 10741.44 -1877.58 3808.05 4245.41 3.05 12956.00 84.56 139.17 10745.65 -1911.03 3836.96 4285.9 0.01 GP 22-13RD3 36 4.2 Bit Record BIT NO. SIZE TYPE S/N JETS/ TFA IN OUT Feet Drilled HRS AVE ROP (Ft/HR) CONDITION Mill 6” Window Mill ZR100923 8495 8560 65 9.5 6.8 IN GAUGE 1 6” HDBS MM53D 12934533 5x12 8560 10704 2144 41.5 51.6 2-1-CT-C-X-I-NO-PR 2 6” HDBS MM53D 12934535 5x12 10704 10792 1120 54.9 20.4 1-1-WT-G-X-I-NO-BHA 3 6” HDBS MM53D 12934534 5x12 10792 12337 1545 34.1 45.3 2-1-BT-N-X-I-NO-HP 2rr1 6” HDBS MM53D 12934535 5x12 10099 10533 434 20.5 21.2 1-2-BT-T-X-I-WT-BHA 4 6” Varel V516DX 4009138 3x11, 2x13 10533 12956 2423 54.75 60.1 6-8-RO-A-X-2-BT-PR GP 22-13RD3 37 4.3 Mud Record Contractor: Halliburton Baroid Date Depth MD TVD MW (ppg) VIS (s/qt) PV YP Gels HTHP (cc) FC Sols (%) O/W Ratio Sd (%) ASG AgNO3 CaCl2 (ppbl) Lime (ppb) Enviromul 8/15/17 8498 8153 9.2 96 22 11 8/15/19 3.0 0/1 8.5 77.8/22.2 3.333 1.1 4.81 3.76 8/16/17 8560 8189 8.95 81 21 14 8/15/20 3.5 0/2 7.7 80.2/19.8 3.305 1.0 4.81 3.88 8/17/17 8666 8249 9.12 73 21 12 7/17/19 3.2 0/3 8.1 79.4/20.6 3.211 1.5 12.09 5.83 8/18/17 9566 8976 9.0 74 24 14 8/19/21 3.3 0/3 7.6 79.5/20.5 3.106 1.7 14.03 4.14 8/19/17 10387 9667 9.0 79 22 11 9/19/27 2.8 0/3 7.8 80.0/20.0 3.033 1.8 15.97 5.18 8/20/17 10704 9934 9.12 88 24 11 9/19/25 3.2 0/3 8.8 79.8/20.2 2.945 1.8 15.97 5.18 8/21/17 10735 9955 9.1 92 23 12 11/21/29 3.4 0/3 8.0 79.7/20.3 3.093 2.0 17.91 6.35 8/22/17 11427 10332 9.0 80 22 13 10/23/30 3.4 0/3 8.4 80.4/19.6 2.914 1.8 15.49 7.12 PULL BACK TO 10749’ FOR OPEN HOLE SIDETRACK 8/23/17 10751 9967 9.0 84 24 14 12/24/31 3.4 0/3 8.4 81.0/19.0 2.935 1.7 14.03 5.96 8/24/17 10759 9984 9.0 86 28 14 13/24/30 3.5 0/3 6.0 79.9/20.1 3.790 1.6 12.09 9.19 8/25/17 10792 10000 9.0 105 35 13 12/25/33 3.4 0/3 8.0 80.6/19.4 3.054 1.6 13.54 5.83 8/26/17 10792 10000 9.0 112 28 12 12/23/30 3.5 0/3 8.1 80.6/19.4 3.060 1.6 12.57 9.07 8/27/17 10792 10000 9.05 105 29 14 14/27/35 3.4 0/3 8.0 80.0/20.0 3.121 1.6 13.06 8.16 8/28/17 11387 10374 9.0 89 25 14 13/25/30 3.5 0/3 7.4 81.2/18.8 3.210 1.8 15.0 7.90 8/29/17 11965 10656 8.95 95 30 14 13/27/31 3.5 0/3 7.3 80.9/19.1 3,210 1.6 14.51 7.12 8/30/17 12337 10820 9.0 90 27 15 12/25/28 3.4 0/3 8.6 81.6/18.4 2,932 1.6 15.0 6.35 8/31/17 12337 10820 9.0 101 26 13 11/24/29 3.6 0/3 8.4 81.3/18.7 2,995 1.6 14.03 5.70 9/1/17 12337 10820 9.0 141 28 13 11/25/30 3.6 0/3 7.9 80.6/19.4 3,037 1.7 15.97 6.22 PULL BACK TO 10099’ FOR CEMENT PLUG SIDETRACK 9/2/17 9947 9298 9.05 169 27 14 10/18/24 3.8 0/3 8.1 77.8/22.2 3,058 1.6 14.03 6.35 9/3/17 9947 9298 9.1 149 28 13 10/1824 3.8 0/3 8.1 77.8/22.2 3,132 1.6 14.03 7.90 9/4/17 10142 9466 9.35 74 28 11 8/17/19 3.4 0/3 7.9 78.3/21.7 3,524 1.7 15.0 8.16 9/5/17 10533 9787 9.4 73 25 10 7/14/17 3.6 0/3 8.8 79.5/20.5 3,308 1.9 17.91 6.22 9/6/17 10533 9787 9.4 109 24 10 8/15/17 3.6 0/3 8.3 79.9/20.1 3,463 1.9 17.91 6.35 9/7/17 10917 9989 9.35 71 27 9 8/15/18 3.4 0/3 8.6 79.6/20.4 3,314 1.8 16.94 6.35 9/8/17 11913 10435 9.35 80 30 10 9/20/23 3.3 0/3 9.1 84.9/15.1 3,375 1.7 15.97 5.96 9/9/17 11913 10435 9.4 86 27 10 9/15/23 3.4 0/3 7.9 81.1/18.9 3,644 1.9 17.91 5.83 9/10/17 12319 10616 9.3 78 25 13 10/20/28 3.3 0/3 7.9 81.1/18.9 3,521 1.8 14.03 5.70 9/11/17 12898 10736 9.3 78 26 11 10/21/26 3.5 0/3 8.0 82.2/17.8 3,505 2.0 17.91 3.88 9/12/17 12956 10745 9.4 102 41 13 10/21/24 3.4 0/3 9.1 82.0/18.0 3,363 1.5 13.06 6.47 Abbreviations: MW = Mud Weight VIS = Funnel Viscosity PV = Plastic Viscosity YP = Yield Point Gels = Gel Strength FL = Water or Filtrate Loss FC = Filter Cake O/W = Oil to Water ratio Sols = Solids Sd = Sand content MBT = Methylene Blue Alk, Pm = Alkalinity, Mud pH = Acidity Cl = Chlorides Ca = Hardness Calcium nr = Not Recorded GP 22-13RD3 38 4.4 Drilling Progress Days Vs Depth 8000 9000 10000 11000 12000 13000 8/13/20178/15/20178/17/20178/19/20178/21/20178/23/20178/25/20178/27/20178/29/20178/31/20179/2/20179/4/20179/6/20179/8/20179/10/20179/12/20176" GP-22 RD3 6" GP-22 RD3 6" (PB2) 6" (PB1) GP 22-13RD3 39 5 SHOW REPORTS Hydrocarbon Show Report #1 Operator: Well:API Number: Field:Date: Rig:Time: County:Depth Start End State:25 9723'MD 9774'MD Country:25 9117'TVD 9163'TVD ROP (fph)96 ft/hr 75 ft/hr 66 ft/hr 135 ft/hr WOB 7 klbs 6 klbs 8 klbs 8 klbs RPM 120 rpm 114 rpm 100 rpm 140 rpm PP 2359 psi 2334 psi 2412 psi 2399 psi Mud Weight 9.0 lbs/gal 9.0 lbs/gal 9.0 lbs/gal 9.0 lbs/gal Chlorides Total Gas 31 46 13 76 C1 (ppm)6,021 7,723 2,132 13,033 C2 (ppm)39 304 31 561 C3 (ppm)7 161 15 300 C4 (ppm)0 53 3 103 C5 (ppm)0 5 0 23 Intensity None Amount 5%Opacity Clear Amount 0% At Shakers No Color Faint Color None-Gray Color None-Gray Type None Amount 10%Speed Quick Intensity Strong Fluor Color None Distribution Spotty Opacity Opaque Color white Outgassing No Intensity Weak-Dull Intensity Moderate Mud Type Oil-LVT Color v pl yel Color brt white Report by: Kenai Peninsula Borough Alaska USA Free Oil in Mud Visible CutOil Stain Josh Dubowski / Ralph Winkelman Show Summary Oil Indicators Lithology Averages Hilcorp Alaska, LLC 50-733-20095-03GP 22-13 RD3 Granite Point Field Kuukpik 5 8/19/2017 1:00 AM Sand/conglomeratic sand = medium brownish gray to light grayish brown; individual grains dominantly clear to translucent quartz and volcanic glass, light to dark gray, pale rose and dusky red and white; very fine upper to very coarse upper; dominantly fine upper coarse lower; angular to subangular with minor subrounded; poor sorting; dominantly unconsolidated; no fluorescence above oil base mud background of dull greenish yellow. Petroleum Odor Before During After Maximum Weak to moderate oil show with OBM contamination interfering with hydrocarbon fluorescence and odor. Residual Cut (Ring) (Ring) Cut FluorSample Fluorescence Cut Fluorescence Oil Show Rating 1.2 1.0 10.0 100.0 1000.0 10000.0 1 2 3 4ppmPixler Plot C1/C2 C1/C3 C1/C4 C1/C5 Non Productive Oil Window Condensate Dry Gas Hydrocarbon Show Report #2 Operator: Well:API Number: Field:Date: Rig:Time: County:Depth Start End State:25 10210'MD 10372'MD Country:25 9524'TVD 9659'TVD ROP (fph)38 ft/hr 65 ft/hr 55 ft/hr 130 ft/hr WOB 4 klbs 6 klbs 6 klbs 10 klbs RPM 115 rpm 110 rpm 113 rpm 118 rpm PP 1598 psi 1548 psi 1559 psi 1682 psi Mud Weight 9.4 lbs/gal 9.4 lbs/gal 9.4 lbs/gal 9.4 lbs/gal Chlorides Total Gas 3 58 10 102 C1 (ppm)394 9,160 1,084 16,975 C2 (ppm)3 329 44 546 C3 (ppm)1 138 23 231 C4 (ppm)0 42 8 72 C5 (ppm)1 3 1 16 Intensity None Amount 0%Opacity Clear Amount 0% At Shakers No Color None-Gray Color None-Gray Color None-Gray Type None Amount 10%Speed None Intensity Weak-Dull Fluor Color None Distribution Pinpoint Opacity Clear Color pl yel-grn Outgassing No Intensity Mod-strng Intensity None-v wk Mud Type Oil-LVT Color brt yel-wht Color None Report by: dull yellowish white fluorescence; no visual cut; very slow, translucent, streaming fluorescent cut; no staining; no odor. Residual Cut (Ring) (Ring) Cut FluorSample Fluorescence Cut Fluorescence Oil Show Rating 0.7 9/5/2017 10:00 AM sand/ conglomeratic sand/ tuffaceous sandstone (10230' - 10310') = medium to medium light gray overall with a pale yellowish brown secondary hue; unconsolidated to easily friable; upper very fine to upper very coarse; predominantly upper fine to upper medium; sub angular to sub rounded to angular; poorly sorted; sub spherical to sub discoidal; clear to translucent quartz dominant; trace bit broken 2-4mm grains; interbedded with minor thin coals; Petroleum Odor Before During After Maximum Josh Dubowski / Paul Webster Show Summary Oil Indicators Lithology Averages Hilcorp Alaska, LLC 50-733-20095-03-00GP 22-13 RD3 Granite Point Field Kuukpik 5 Kenai Peninsula Borough Alaska USA Free Oil in Mud Visible CutOil Stain 1.0 10.0 100.0 1000.0 10000.0 1 2 3 4ppmPixler Plot C1/C2 C1/C3 C1/C4 C1/C5 Non Productive Oil Window Condensate Dry Gas Hydrocarbon Show Report #3 Operator: Well:API Number: Field:Date: Rig:Time: County:Depth Start End State:25 10551'MD 11608'MD Country:25 9797'TVD 10282'TVD ROP (fph)76 ft/hr 71 ft/hr 85 ft/hr 220 ft/hr WOB 7 klbs 8 klbs 8 klbs 19 klbs RPM 34 rpm 47 rpm 82 rpm 101 rpm PP 2008 psi 2481 psi 2832 psi 2902 psi Mud Weight 0.0 lbs/gal 0.0 lbs/gal 0.0 lbs/gal 0.0 lbs/gal Chlorides Total Gas 86 80 44 197 C1 (ppm)15,026 11,797 6,077 29,494 C2 (ppm)50 378 211 811 C3 (ppm)26 257 188 593 C4 (ppm)11 116 113 304 C5 (ppm)1 35 45 100 Intensity None Amount 0%Opacity Translu Amount 70% At Shakers No Color None-Gray Color Brown Color V Lt Brn Type None Amount 100%Speed Slow Intensity Moderate Fluor Color None Distribution Patchy Opacity Translu Color pl yel-grn Outgassing No Intensity Weak-Dull Intensity Moderate Mud Type Oil-LVT Color pale yel Color white Report by: Kenai Peninsula Borough Alaska USA Free Oil in Mud Visible CutOil Stain Josh Dubowski / Paul Webster Show Summary Oil Indicators Lithology Averages Hilcorp Alaska, LLC 50-733-20095-03-00GP 22-13 RD3 Granite Point Field Kuukpik 5 9/7/2017 8:00 AM sand / sandstone = dark reddish brown with blackish hues to dark brownish gray; unconsolidated; lower medium to lower fine; lower coarse to upper very fine common; moderate to poor sorting; sub spherical to spherical; sub angular to sub rounded to angular; grain supported; ashy matrix; non calcareous; overall dominated by clear to translucent quartz; dark lithics and carbonaceous sediment common; samples heavily contaminated with mud product; Petroleum Odor Before During After Maximum 100% dull yellowish gold to trace patchy moderate yellow gold sample fluorescence; instant to very slow streaming moderate white cut; moderate brown visible cut; pale brown to dark straw residual cut; moderate greenish yellow residual fluorescence; obm and mud product masks any odor, staining or observable free oil in the samples. Residual Cut (Ring) (Ring) Cut FluorSample Fluorescence Cut Fluorescence Oil Show Rating 1.7 1.0 10.0 100.0 1000.0 10000.0 1 2 3 4ppmPixler Plot C1/C2 C1/C3 C1/C4 C1/C5 Non Productive Oil Window Condensate Dry Gas GP 22-13RD3 40 6 DAILY REPORTS Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick brumley, Bob Mize DATE Aug 16, 2017 DEPTH 8560 PRESENT OPERATION Prep to P/U BHA TIME 23:59 YESTERDAY 8496 24 HOUR FOOTAGE 64 CASING INFORMATION 7"@8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 8500 54.27 92.58 8153.98 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 71.1 @ 8512 0.6 @ 8514 10.7 12.5 FT/HR SURFACE TORQUE 21519 @ 8533 21515 @ 8538 21853.7 21518.1 FT- LBS WEIGHT ON BIT 18 @ 8554 0 @ 8508 9.7 13.9 KLBS ROTARY RPM 93 @ 8531 73 @ 8496 90.9 91.2 RPM PUMP PRESSURE 1936 @ 8557 1768 @ 8516 1887.9 1793.3 PSI DRILLING FLUIDS REPORT DEPTH 8498 MW 9.2 VIS 96 PV 22 YP 11 FL Gels 8/15/19 CL- FC 0/1 SOL 8.5 SD OIL 70/20 MBT pH Ca+ 4.81 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 19 @ 8512 2 @ 8514.00000 6.4 TRIP GAS CUTTING GAS 0 @ 8560 0 @ 8560.00000 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1)4507 @ 8512 438 @ 8514.00000 1152.5 CONNECTION GAS HIGH ETHANE (C-2) 16 @ 8556 1 @ 8502.00000 4.1 AVG PROPANE (C-3) 4 @ 8543 0 @ 8521.00000 0.8 CURRENT BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 10% sand, 10% claystone, 80% siltstone DAILY ACTIVITY SUMMARY Finish mill window from 8498’ – 8508’. Drill open hole to 8530’. CBU and perform FIT = 12.5 EQMW. Drill additional 30 CANRIG PERSONNEL ON LOCATION 4 DAILY COST $2755 REPORT BY Ralph Winkelman Save Clear Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Bob Mize DATE Aug 17, 2017 DEPTH 8714 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 8560 24 HOUR FOOTAGE 154 CASING INFORMATION 7"@ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 8500 54.27 92.58 8153.98 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HDBS MM53D 12934535 5x12 8560 154 5:50 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 169.3 @ 8659 0.8 @ 8614 45.5 59.8 FT/HR SURFACE TORQUE 6495 @ 8606 2675 @ 8581 4493.4 4469.9 FT-LBS WEIGHT ON BIT 10 @ 8582 6 @ 8561 8.4 7.6 KLBS ROTARY RPM 118 @ 8665 63 @ 8614 94.6 117.9 RPM PUMP PRESSURE 2196 @ 8648 1640 @ 8708 2096.2 2149.9 PSI DRILLING FLUIDS REPORT DEPTH 8560 MW 8.95 VIS 81 PV 21 YP 14 FL Gels 8/15/20 CL- FC 0/2 SOL 7.7 SD OIL 80.2/19.8 MBT pH Ca+ 4.81 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 6 @ 8631 0 @ 8646 2.0 TRIP GAS 30 CUTTING GAS 0 @ 8714 0 @ 8714 0.0 WIPER GAS NONE CHROMATOGRAPHY (ppm) SURVEY NONE METHANE (C-1) 1128 @ 8712 121 @ 8620 375.3 CONNECTION GAS HIGH NONE ETHANE (C-2) 42 @ 8632 0 @ 8694 0.7 AVG PROPANE (C-3) 323 @ 8632 0 @ 8589 3.7 CURRENT 2 BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 1.5 PENTANE (C-5) @ @ HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 10% SAND, 40% CLAYSTONE, 50% SILTSTONE PRESENT LITHOLOGY 30% SAND, 20% CLAYSTONE, 50% SILTSTONE DAILY ACTIVITY SUMMARY Prep to P/U BHA. Make up BHA as per DD/MWD. Upload and load sources. Pick up pipe 302’ – 1353’. RIH to 6500’ Fill pipe. Cont RIH to 8490’. Fill pipe and get slow pump rates. Continue RIH and tag up at 8546’. Ream to bottom and drill ahead to 8632’. Change out air boot on flow box to flow line outlet. Continue to drill ahead to 8714 at report time. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Bob Mize DATE Aug 18, 2017 DEPTH 9663 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 8714 24 HOUR FOOTAGE 949 CASING INFORMATION 7" @ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 9446.23 32.09 156.27 8873.55 9507.48 30.43 154.64 8925.91 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HDBS MM35D 12934535 5x12 8560 1103 21:18 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 340.0 @ 9545 1.3 @ 8992 86.0 115.3 FT/HR SURFACE TORQUE 6749 @ 9187 2772 @ 8997 4888.6 4364.7 FT-LBS WEIGHT ON BIT 15 @ 9354 0 @ 9235 8.1 5.6 KLBS ROTARY RPM 138 @ 9354 44 @ 8950 122.6 120.7 RPM PUMP PRESSURE 2461 @ 9077 1159 @ 8950 2229.7 2303.4 PSI DRILLING FLUIDS REPORT DEPTH 9566 MW 9.0 VIS 74 PV 24 YP 14 FL Gels 8/19/21 CL- FC 0/3 SOL 7.6 SD OIL 79.5/20.5 MBT pH Ca+ 14.03 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 61 @ 9212 1 @ 8716 9.8 TRIP GAS NONE CUTTING GAS 0 @ 9663 0 @ 9663 0.0 WIPER GAS NONE CHROMATOGRAPHY (ppm) SURVEY NONE METHANE (C-1) 11224 @ 8862 169 @ 9110 1640.5 CONNECTION GAS HIGH NONE ETHANE (C-2) 19 @ 9662 0 @ 9110 2.4 AVG PROPANE (C-3) 5 @ 9662 0 @ 9311 0.5 CURRENT 16 BUTANE (C-4) @ @ . CURRENT BACKGROUND/AVG 10/ 6 PENTANE (C-5) @ @ HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 30% SAND, 40% SILTSTONE, 30 CLAYSTONE, TR COAL PRESENT LITHOLOGY 30%COAL, 20%SAND, 30% SILTSTONE, 20% CLAYSTONE DAILY ACTIVITY SUMMARY Continue drill from 8714’ – 9663’. at report time. Pump sweeps at 8835’ (75% cuttings increase), 9234’ (25% increase) and 9543’ (10% cuttings increase.) CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Bob Mize DATE Aug 19, 2017 DEPTH 10420 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 9663 24 HOUR FOOTAGE 757 CASING INFORMATION 7" @ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10249.43 33.91 140.96 9555.38 10311.48 35.33 145.34 9606.45 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HDBS MM35D 12934535 5x12 8560 1860 33:48 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 174.1 @ 10130 1.3 @ 9978 81.6 23.8 FT/HR SURFACE TORQUE 7808 @ 9996 2533 @ 10283 5239.8 7052.5 FT-LBS WEIGHT ON BIT 14 @ 9949 2 @ 9836 7.6 11.4 KLBS ROTARY RPM 141 @ 10205 70 @ 9905 124.3 100.8 RPM PUMP PRESSURE 2778 @ 9818 1415 @ 10223 2195.6 2462.1 PSI DRILLING FLUIDS REPORT DEPTH MW VIS PV YP FL Gels CL- FC SOL SD OIL MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 95 @ 10135 1 @ 9980 22.9 TRIP GAS N/A CUTTING GAS 0 @ 10409 0 @ 10409 0.0 WIPER GAS 52 CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 20019 @ 10137 119 @ 9980 4056.4 CONNECTION GAS HIGH N/A ETHANE (C-2) 560 @ 9755 0 @ 9980 83.6 AVG N/A PROPANE (C-3) 300 @ 9755 0 @ 10206 39.4 CURRENT 31 BUTANE (C-4) 102 @ 9755 0 @ 9934 12.9 CURRENT BACKGROUND/AVG 9/ 11 PENTANE (C-5) 23 @ 10361 0 @ 10016 0.9 HYDROCARBON SHOWS GAS SHOW. POOR OIL INDICATORS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 9723-9774 Sand/conglomeratic sand = medium brownish gray to light grayish brown; individual grains dominantly clear to translucent quartz and volcanic glass, light to dark gray, pale rose and dusky red and white; very fine upper to very coarse upper; dominantly fine upper coarse lower; angular to subangular with minor subrounded; poor sorting; dominantly unconsolidated; TOTAL - 46 C1 - 7723 C2 - 304 C3 - 161 C4 - 53 C5 - 5 Weak to moderate oil show with OBM contamination interfering with hydrocarbon fluorescence and odor. LITHOLOGY 70% SAND, 10% CLAYSTONE, 20% SILTSTONE, TRACE COAL PRESENT LITHOLOGY 60% SAND, 30% SILTSTONE, 10% CLAYSTONE DAILY ACTIVITY SUMMARY Continue drilling from9663’ to 9835’. Cbu. Wipe hole back to 9167’. RIH w/ 22 singles. Pump sweep at 9793’ with 50% increase. Drill ahead from 9835’ to 10420’. Pump sweep at 10285’ with 10% increase cuttings. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Bob Mize DATE Aug 20, 2017 DEPTH 10704 PRESENT OPERATION Download MWD TIME 23:59 YESTERDAY 10420 24 HOUR FOOTAGE 284 CASING INFORMATION 7" @ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10498.73 31.73 145.58 9761.80 10563.03 32.61 143.53 9816.23 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HDBS MM35D 12934535 5x12 8560 10704 2144 41.5 ROP DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 175.9 @ 10501 1.4 @ 10508 57.9 37.6 FT/HR SURFACE TORQUE 8098 @ 10549 2933 @ 10695 5389.3 3562.2 FT-LBS WEIGHT ON BIT 19 @ 10671 2 @ 10461 7.7 16.9 KLBS ROTARY RPM 141 @ 10540 79 @ 10596 122.7 109.7 RPM PUMP PRESSURE 2527 @ 10426 1677 @ 10692 2215.8 2013.3 PSI DRILLING FLUIDS REPORT DEPTH 1387 MW 9.0 VIS 78 PV 22 YP 11 FL Gels 9/19/27 CL- FC 0/3 SOL 7.8 SD OIL 80.0/20.0 MBT pH Ca+ 15.97 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 100 @ 10506 3 @ 10694.00000 24.8 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 21806 @ 10507 556 @ 10694 4601.6 CONNECTION GAS HIGH N/A ETHANE (C-2) 355 @ 10636 12 @ 10536 116.1 AVG N/A PROPANE (C-3) 209 @ 10636 13 @ 10699 71.2 CURRENT N/A BUTANE (C-4) 80 @ 10636 3 @ 10481 30.9 CURRENT BACKGROUND/AVG N/A PENTANE (C-5) 22 @ 10574 0 @ 10540 3.7 HYDROCARBON SHOWS 1,2,3 SEE SEPERATE SHOW REPORTS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 9723-9774 10216-10380 10530-10657 LITHOLOGY 80% SAND, 10% CLAYSTONE, 10% SILTSTONE, TRACE COAL PRESENT LITHOLOGY 50% SAND, 30% SILTSTONE, 20% CLAYSTONE DAILY ACTIVITY SUMMARY Continue drilling from10420’ to 10704’. Pump sweep, 20% increase. POOH to 6247’. Service rig, continue POOH to BHA. Stand back HWDP, jars, collars. Remove source, download MWD. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Bob Mize DATE Aug 21, 2017 DEPTH 10778 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 10704 24 HOUR FOOTAGE 74 CASING INFORMATION 7" @ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10623.67 35.00 143.32 9866.62 10682.96 36.60 142.71 9914.70 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HDBS MM35D 12934533 5x12 8560 10704 2144 41.5 2-1-CT-C-X-I-NO-PR ROP 2 6" HDBS MM35D 12934535 5x12 10704 74 1:30 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 135.0 @ 10722 3.5 @ 10721 53.8 40.7 FT/HR SURFACE TORQUE 6589 @ 10719 3562 @ 10704 6049.3 6008.5 FT-LBS WEIGHT ON BIT 16 @ 10704 3 @ 10721 8.4 7.1 KLBS ROTARY RPM 119 @ 10737 109 @ 10704 120.7 118.9 RPM PUMP PRESSURE 2176 @ 10732 1835 @ 10720 2032.1 1847.9 PSI DRILLING FLUIDS REPORT DEPTH 10735 MW 9.1 VIS 92 PV 23 YP 12 FL Gels 11/21/29 CL- FC 0/3 SOL 8.0 SD OIL 79.7/20.3 MBT pH Ca+ 17.91 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 24 @ 10742 4 @ 10704.00000 12.8 TRIP GAS 246 CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 4620 @ 10742 771 @ 10704 2397.7 CONNECTION GAS HIGH N/A ETHANE (C-2) 32 @ 10742 3 @ 10729 10.9 AVG N/A PROPANE (C-3) 37 @ 10742 2 @ 10719 9.3 CURRENT 8 BUTANE (C-4) 21 @ 10743 0 @ 10730 4.1 CURRENT BACKGROUND/AVG 7 / 5 PENTANE (C-5) 3 @ 10775 0 @ 10739 0.4 HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 30% SAND, 30% CLAYSTONE, 40% SILTSTONE PRESENT LITHOLOGY 30% SAND, 30% CLAYSTONE, 40% SILTSTONE DAILY ACTIVITY SUMMARY Continue downloading MWD. Continue laydown BHA, stabilizer damaged on ILS. P/U MWD, directional tools and download same. Perform pulse test. RIH to 2500’, fill pipe. RIH to 6490’ at top of liner. Break in Geopilot as per directional driller. RIH to 8490’. Slip and cut 129’ drilling line. Service draw works and top drive. Continue RIH to 10661’ Tight at 10146’ and 10510’. Wash to bottom from 10661 to 10700’. Set down with 5K. Down link as per DD. Drill ahead to 10778’ at report time. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 22, 2017 DEPTH 11480 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 10778 24 HOUR FOOTAGE 702 CASING INFORMATION 7" @ 8498' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11309.06 65.58 125.57 10277.93 11371.15 65.57 125.42 10303.60 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HDBS MM35D 12934535 5x12 10704 776 11:09 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 212.9 @ 10847 5.1 @ 11033 78.6 42.5 FT/HR SURFACE TORQUE 7397 @ 11048 0 @ 11403 5641.4 6132.5 FT-LBS WEIGHT ON BIT 9 @ 11273 0 @ 11403 7.11 6.4 KLBS ROTARY RPM 140 @ 11171 0 @ 11403 80.6 119.3 RPM PUMP PRESSURE 2380 @ 11345 0 @ 11403 1755.6 2037.9 PSI DRILLING FLUIDS REPORT DEPTH 11427 MW 9.0 VIS 80 PV 22 YP 13 FL Gels 10/23/30 CL- FC 0/3 SOL 8.4 SD OIL 80.4/19.6 MBT pH Ca+ 15.49 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 99 @ 10905 1 @ 10953 27.5 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 18254 @ 11271 264 @ 10953 5614.4 CONNECTION GAS HIGH N/A ETHANE (C-2) 51 @ 11273 0 @ 10953 15.8 AVG N/A PROPANE (C-3) 13 @ 11265 0 @ 10953 4.2 CURRENT 14 BUTANE (C-4) 9 @ 11284 0 @ 10953 0.2 CURRENT BACKGROUND/AVG 10/ 9 PENTANE (C-5) 6 @ 11284 0 @ 10953 0.1 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 60% COAL, 10% SAND, 10% CLAYSTONE, 20% SILTSTONE PRESENT LITHOLOGY 20% COAL, 10% SAND, 20% CLAYSTONE, 50% SILTSTONE DAILY ACTIVITY SUMMARY Drill from 10778’ to 11283’, pump sweep at 11095’, 25% increase. Ream out dogleg, 11220’ – 11255’, 12:00 – 18:00. Resume drilling 11283’ TO 11480’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 23, 2017 DEPTH 11781 PRESENT OPERATION Pull back and open hole sidetrack TIME 23:59 YESTERDAY 11480 24 HOUR FOOTAGE 301 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11620.84 63.36 128.95 10414.07 11682.27 63.21 131.16 10441.69 10748.79 38.70 140.32 9966.83 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HDBS MM35D 12934535 5x12 10704 1077 16:35 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 161.7 @ 11603 10.1 @ 11531 50.6 28.8 FT/HR SURFACE TORQUE 6912 @ 11605 5481 @ 11550 5754.1 5947.3 FT-LBS WEIGHT ON BIT 8 @ 11574 5 @ 11658 6.8 7.8 KLBS ROTARY RPM 120 @ 11744 119 @ 11501 110.4 120.9 RPM PUMP PRESSURE 2643 @ 11773 1531 @ 11510 2010.0 2623.0 PSI DRILLING FLUIDS REPORT DEPTH 11427 MW 9.0 VIS 80 PV 22 YP 13 FL Gels CL- 10/23/30 FC 0/3 SOL 8.4 SD OIL 80.4/19.6 MBT pH Ca+ 15.49 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 25 @ 11616 8 @ 11761 14.7 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 5410 @ 11617 1159 @ 11534 2750.9 CONNECTION GAS HIGH N/A ETHANE (C-2) 16 @ 11617 3 @ 11534 8.0 AVG N/A PROPANE (C-3) 5 @ 11632 0 @ 11668 1.9 CURRENT 2 BUTANE (C-4) 3 @ 11715 0 @ 11708 0.1 CURRENT BACKGROUND/AVG 1/2 PENTANE (C-5) 5 @ 11657 0 @ 11644 0.1 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 20% SAND, 50% SILTSTONE, 30 CLAYSTONE PRESENT LITHOLOGY 40% SAND, 40% SILTSTONE, 20% CLAYSTONE DAILY ACTIVITY SUMMARY Drill from 11480’ to 11781’. Pump sweep at 11532’, 10% increase, 10 bbls late. CBU, POOH to 10248’. CBU. TIH to 10723’. Start time drilling for open hole sidetrack at 10749’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 24, 2017 DEPTH 10760 PRESENT OPERATION Time drill forsidetrack TIME 23:59 YESTERDAY 10751 24 HOUR FOOTAGE 9 CASING INFORMATION 6" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10748.79 38.70 140.32 9966.83 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HDBS MM35D 12934535 5x12 10704 1088 40:10 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 1.2 @ 10755 0.4 @ 10751 0.8 0.56 FT/HR SURFACE TORQUE 5136 @ 10751 4638 @ 10753 5615.2 4979.49 FT-LBS WEIGHT ON BIT 0 @ 10752 0 @ 10758 0.4 0.13 KLBS ROTARY RPM 139 @ 10752 138 @ 10757 156.4 138.9 RPM PUMP PRESSURE 2346 @ 10753 2039 @ 10757 2481.0 2049.5 PSI DRILLING FLUIDS REPORT DEPTH 10751 MW 9.0 VIS 84 PV 24 YP 14 FL Gels 12/24/31 CL- FC 0/3 SOL 8.4 SD OIL 81.0/19.0 MBT pH Ca+ 14.03 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 3 @ 10752 1 @ 10756.00000 2.4 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 708 @ 10752 260 @ 10756 470.1 CONNECTION GAS HIGH NA/ ETHANE (C-2) 3 @ 10751 1 @ 10756 2.3 AVG NA/ PROPANE (C-3) 3 @ 10752 0 @ 10757 1.8 CURRENT 3 BUTANE (C-4) 6 @ 10752 1 @ 10758 4.2 CURRENT BACKGROUND/AVG 2/ 1 PENTANE (C-5) 6 @ 10753 1 @ 10759 3.5 HYDROCARBON SHOWS N/A INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 40%SAND, 30% CLAYSTONE, 30% SILTSTONE PRESENT LITHOLOGY 40%SAND, 30% CLAYSTONE, 30% SILTSTONE DAILY ACTIVITY SUMMARY Continue time drilling from 10752’ to 10768’. Slipped into old hole. Start over time drill 10752’ depth correction to 10756’. Continue time drill 10756’ to 10760’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 25, 2017 DEPTH 10792 PRESENT OPERATION Trouble shoot leaking test plug for BOP test. TIME 23:59 YESTERDAY 10751 24 HOUR FOOTAGE 41 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10748.79 38.70 140.32 9966.32 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HDBS MM35D 12934535 5x12 10704 10792 1120 54.9 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 7.5 @ 10779 0.3 @ 10761 2.1 5.2 FT/HR SURFACE TORQUE 5181 @ 10767 4521 @ 10774 5099.6 4962.0 FT-LBS WEIGHT ON BIT 3 @ 10781 0 @ 10758 1.1 2.2 KLBS ROTARY RPM 139 @ 10752 138 @ 10767 143.5 138.9 RPM PUMP PRESSURE 2346 @ 10751 1986 @ 10770 2139.7 2003.1 PSI DRILLING FLUIDS REPORT DEPTH 10759 MW 9.0 VIS 86 PV 28 YP 14 FL Gels 13/24/30 CL- FC 0/3 SOL 6.0 SD OIL 79.9/20.1 MBT pH Ca+ 12.069 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 12 @ 10782 1 @ 10761 5.4 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 708 @ 10752 197 @ 10781 340.7 CONNECTION GAS HIGH N/A ETHANE (C-2) 3 @ 10751 0 @ 10781 1.7 AVG N/A PROPANE (C-3) 3 @ 10752 0 @ 10782 1.0 CURRENT 0 BUTANE (C-4) 6 @ 10752 0 @ 10767 2.3 CURRENT BACKGROUND/AVG 0 / 1.2 PENTANE (C-5) 6 @ 10753 0 @ 10772 2.2 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE PRESENT LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE DAILY ACTIVITY SUMMARY Continue time drill 10760’ to 10777’. Pump sweep around with 10% increase while continuing to time drill to 10792’. Did not CBU. Returns at 10782’. POOH to 8366’ for BOP test. Install test plug and pressure up for shell test. Leaking by test plug. Trouble shoot and attempt to retest several times. Failed Continue to trouble shoot and retest at report time. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 26, 2017 DEPTH 10792 PRESENT OPERATION BHA activity TIME 23:59 YESTERDAY 10792 24 HOUR FOOTAGE 0 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10748.79 38.70 140.32 9966.32 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HDBS MM35D 12934535 5x12 10704 10792 1120 54.9 1-1-WT-G-X-I-NO-BHA BHA DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 10792 MW 9.0 VIS 105 PV 35 YP 13 FL Gels 12/25/33 CL- FC 0/3 SOL 8.0 SD OIL 80.6/19.4 MBT pH Ca+ 13.54 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ @ 0 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT N/A BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG N/A PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE PRESENT LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE DAILY ACTIVITY SUMMARY Pull test plug. Drain stack and flush with water. Land test plug and get good seal. Test BOP. Lower IBOP failed. Replacement on the way. Lay down test joint. Pump dry job. POOH for bit and MWD inspection. Service rig at 4644’. Continue POOH. BHA operations at report time. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR DATE Aug 27, 2017 DEPTH 10792 PRESENT OPERATION Ream to bottom at approx 10260' TIME 23:59 YESTERDAY 10792 24 HOUR FOOTAGE 0 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10748.79' 38.70 140.32 9966.32' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 10792 MW 9.0 VIS 112 PV 28 YP 12 FL Gels 12/23/30 CL- FC 0/3 SOL 8.1 SD OIL 80.6/19.4 MBT pH Ca+ 12.57 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 53 CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT 9 BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 11 / 10 PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE PRESENT LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 20% CLAYSTONE, 30% SILTSTONE DAILY ACTIVITY SUMMARY Continue make up BHA, Upload, pulse test, survey and load sources. TIH to 610’. Change out lower IBOP and saver sub and test same. TIH to 8481’ and CBU. Fill pipe at 2783’ and 5583’. Max gas at top of window = 16units. Continue TIH to approx 9628’, hole tight. Kelly up. Wash and ream to bottom as needed. At approx 10260’at report time, wash and ream to bottom. Max gas 53 units from initial bottoms up from 9628’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Adam Dorr DATE Aug 28, 2017 DEPTH 11432 PRESENT OPERATION Drilling ahead TIME 23:59 YESTERDAY 10792 24 HOUR FOOTAGE 640 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11246.80 58.13 129.82 10309.35 11309.99 59.71 129.94 10341.98 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792 640 12:41 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 231.0 @ 10869 1.4 @ 11359 60.6 25.6 FT/HR SURFACE TORQUE 7606 @ 11210 4388 @ 10795 6102.2 5998.9 FT-LBS WEIGHT ON BIT 7 @ 11069 0 @ 11156 5.2 7.1 KLBS ROTARY RPM 139 @ 10792 118 @ 10820 119.9 119.9 RPM PUMP PRESSURE 2569 @ 11194 1424 @ 10825 2164.9 2271.7 PSI DRILLING FLUIDS REPORT DEPTH 11387 MW 9.0 VIS 89 PV 25 YP 14 FL Gels 13/25/30 CL- FC 0/3 SOL 7.4 SD OIL 81.2/18.8 MBT pH Ca+ 15.0 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 73 @ 10880 1 @ 11208 20.5 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 16509 @ 10881 108 @ 11208 4170.1 CONNECTION GAS HIGH N/A ETHANE (C-2) 234 @ 11307 1 @ 11174 28.4 AVG N/A PROPANE (C-3) 193 @ 11307 0 @ 11207 14.3 CURRENT 12 BUTANE (C-4) 77 @ 11309 0 @ 11154 4.5 CURRENT BACKGROUND/AVG 7 / 9 PENTANE (C-5) 12 @ 11300 0 @ 11154 0.5 HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 30% sand/ tuffaceous sandstone, 10% coal, 40% siltstone, 20% claystone PRESENT LITHOLOGY 20% coal, 40% siltstone, 20% claystone, 20% sand DAILY ACTIVITY SUMMARY Continue wash and ream to bottom. Tag fill 10’ high at 10792’. Pack off issues while washing down. Drill 10792’ to 11432’ at report time. Pump sweep around at 11185’ with no increase. Service rig at 11406’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Aug 29, 2017 DEPTH 12035 PRESENT OPERATION Drill ahead. TIME 23:59 YESTERDAY 11432 24 HOUR FOOTAGE 603 CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11867.91 63.14 132.99 10616.37 11929.68 62.59 133.62 10644.54 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792 1243 26:18 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 175.2 @ 11999 0.8 @ 11656 52.9 114.6 FT/HR SURFACE TORQUE 8586 @ 11833 4900 @ 11590 6673.3 7940.9 FT-LBS WEIGHT ON BIT 10 @ 11992 1 @ 11657 5.8 6.1 KLBS ROTARY RPM 120 @ 11581 80 @ 11894 117.2 119.5 RPM PUMP PRESSURE 2347 @ 11847 1509 @ 11669 2058.8 2085.1 PSI DRILLING FLUIDS REPORT DEPTH 11965 MW 8.95 VIS 95 PV 30 YP 14 FL Gels 13/27/31 CL- FC 0/3 SOL 7.3 SD OIL 80.9/19.1 MBT pH Ca+ 14.51 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 50 @ 12015 3 @ 11698 13.3 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 10637 @ 12015 759 @ 11692 2415.1 CONNECTION GAS HIGH 24@11718 ETHANE (C-2) 162 @ 12015 6 @ 11736 35.1 AVG 14 PROPANE (C-3) 59 @ 11610 2 @ 11716 16.5 CURRENT 15 BUTANE (C-4) 23 @ 11612 0 @ 11895 5.6 CURRENT BACKGROUND/AVG 19/ 10 PENTANE (C-5) 6 @ 11724 0 @ 11826 0.3 HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY 50% TUFFACEOUS SANDSTONE/ SAND, 30% SILTSTONE, 20% CLAYSTONE PRESENT LITHOLOGY 30% COAL, 30% TUFFACEOUS SANDSTONE, 30% SILTSTONE, 10% CLAYSTONE. DAILY ACTIVITY SUMMARY Drill from 11432’ to 11720’, pump sweep, no increase. Continue drill 11720’ to 11866’. #2 HPU hose failure. Pick up off bottom and repair. Resume drilling 11866’ to 12035 at report time. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Ralph Winkelman Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Aug 30, 2017 DEPTH 12337' PRESENT OPERATION Wiper trip TIME 24:00 YESTERDAY 12035' 24 HOUR FOOTAGE 302' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12239.03' 65.70 128.22 10779.57' 12176.72' 65.55 128.20 10753.86' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792' 1545' 34.13 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 151.0 @ 12069' 0.5 @ 12257' 42.5 66.7 FT/HR SURFACE TORQUE 7804 @ 12161' 6112 @ 12245' 6669.2 7566.7 FT-LBS WEIGHT ON BIT 8 @ 12262' 3 @ 12048' 6.0 6.6 KLBS ROTARY RPM 121 @ 12246' 80 @ 12252' 116.9 119.8' RPM PUMP PRESSURE 2135 @ 12175' 1468 @ 12298' 1963.2 1545.7 PSI DRILLING FLUIDS REPORT DEPTH 12337' MW 9.0 VIS 90 PV 27 YP 15 FL 3.4 Gels 12/25/28 CL- FC 0/3 SOL 8.6 SD OIL 81.6/18.4 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 26 @ 12039' 5 @ 12192' 11.2 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) 5057 @ 12039' 927 @ 12245' 1880.1 CONNECTION GAS HIGH 16 ETHANE (C-2) 74 @ 12039' 5 @ 12244' 19.6 AVG 14 PROPANE (C-3) 26 @ 12276' 2 @ 12319' 8.1 CURRENT 16 BUTANE (C-4) 12 @ 12276' 0 @ 12142' 1.7 CURRENT BACKGROUND/AVG 6-10/8 PENTANE (C-5) 5 @ 12177' 0 @ 12269' 0.2 HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous Sandstone, Conglomeritic Sandstone, Sandstone, Tuffaceous Siltstone/Claystone, Coal, Carbonaceous Shale PRESENT LITHOLOGY @ 12337': 10% Tuffaceous Sandstone, 40% Sandstone, 30% Sand, 10% Tuffaceous Siltstone, 10% Tuffaceous Claystone DAILY ACTIVITY SUMMARY Drill from 12035’ to 12337’. Pump 29 barrel sweep and circulate around (MW 9.3 VIS 300+). POOH from 12337’ to 8428’ (tight spots 12060’, 12035’, 11064’, 10021’, 9474’). Cut and slip 146’ drill line, service rig. RIH from 8428’ to 9233’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Aug 31, 2017 DEPTH 12337' PRESENT OPERATION POOH TIME 24:00 YESTERDAY 12337' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12239.03' 65.70 128.22 10779.57' 12176.72' 65.55 128.20 10753.86' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792' 1545' 34.13 New Sidetrack DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 12337' MW 9.0 VIS 101 PV 26 YP 13 FL 3.6 Gels 11/24/29 CL- FC 0/3 SOL 8.4 SD OIL 81.3/18.7 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 120 @ 4 @ 30 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS 120 CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT N/A BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 4-20/11 PENTANE (C-5) @ @ HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY @ 12337': 10% Tuffaceous Sandstone, 40% Sandstone, 30% Sand, 10% Tuffaceous Siltstone, 10% Tuffaceous Claystone DAILY ACTIVITY SUMMARY RIH from 9233’ to 10820’ (fill pipe at 10593’). RIH on elevators (pick up single) from 10820’ to 10854’, stacking out 15K. Packed off. Lay down single. Wash and ream from 10820’ to 10832’, packing off issues. Circulate bottoms up. Continue to work packing off issues from 10820’ to 10857’. Wash and ream from 10857’ to 10960’. Checked inclination and found we had sidetracked original hole. Reciprocate pipe and circulate bottoms up. POOH from 10960’ to 10661’, put 1/2 turn in pipe and attempt to enter new open-hole sidetrack with no success. RIH from 10661’ to 10848’. Trough hole from 10848’ to 10887’. Circulate and attempt to get back in hole to 10903’. POOH from 10903’ to 8428’ (tight spot 8790’). Circulate bottoms up. POOH from 8428’ to 1605’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Sep 01, 2017 DEPTH 12337' PRESENT OPERATION Circulating TIME 24:00 YESTERDAY 12337' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12339.03' 65.70 128/22 10779.57' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792' 12337' 1545' 34.13 2-1-BT-N-X-I-NO-HP Sidetrack DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 12337' MW 9.0 VIS 141 PV 28 YP 13 FL 3.6 Gels 11/25/30 CL- FC 0/3 SOL 7.9 SD OIL 80.6/19.4 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 31 @ 3 @ 10 TRIP GAS 542 (Btms up cmt circ) CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT N/A BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 3-14/9 PENTANE (C-5) @ @ HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY POOH from 1605’ to 114’. Unload sources, download MWD. Lay down BHA. Clean and clear rig floor. Service rig. Make up 3.5” cement stinger. RIH from 664’ to 8414’. Prep for cement job. RIH from 8414’ to 10835’. Break circulation. Wash down and tag up at 10853’. Circulate and work pipe. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Sep 02, 2017 DEPTH 9947' PRESENT OPERATION POOH TIME 24:00 YESTERDAY 9947' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12339.03' 65.70 128/22 10779.57' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HDBS MM53D 13934534 5x12 10792' 12337' 1545' 34.13 2-1-BT-N-X-I-NO-HP Sidetrack DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 9947' MW 9.05 VIS 169 PV 27 YP 10 FL 3.8 Gels 10/18/24 CL- FC 0/3 SOL 8.1 SD OIL 77.8 MBT 22.2 pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 34 @ 6 @ 11 TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT N/A BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 6-8/7 PENTANE (C-5) @ @ HYDROCARBON SHOWS NONE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY Condition and circulate mud while rigging up cementers. Pump 9.1 bbls 16.5ppg cement, pump 8 bbls mud push, displace 138 bbls OBM. POOH from 10852’ to 10525’, pick up 15’ pup joint. RIH to 10597’. Circulate and condition mud. Pum 21 bbls 12ppg mud push, pump 22.7 bbls 16.5ppg cement, 11 bbls mud push, 118 bbls OBM to chase. Rig down cementing equipment. POOH from 10825’ to 9715’. Circulate and condition hole clean. POOH from 9715’ to 8356’. Service rig. POOH from 8356’ to 664’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Sep 03, 2017 DEPTH 9947' PRESENT OPERATION RIH TIME 24:00 YESTERDAY 9947' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2rr1 6" HDBS MM53D 13934535 5x12 9947' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 9947' MW 9.10 VIS 149 PV 28 YP 13 FL 3.8 Gels 10/18/24 CL- FC 0/3 SOL 8.1 SD OIL 77.8/22/2 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS N/A CUTTING GAS @ @ WIPER GAS N/A CHROMATOGRAPHY (ppm) SURVEY N/A METHANE (C-1) @ @ CONNECTION GAS HIGH N/A ETHANE (C-2) @ @ AVG N/A PROPANE (C-3) @ @ CURRENT N/A BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG No circulating PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY POOH from 664’ to surface, laying down 3.5” cement stinger. Clean and clear rig floor. Flush stack. Check koomey bottles and fedder bolt clamp bolts. Begin making up BHA. Observe geo pilot leaking oil from top seals. Decide to wait on new geo pilot from Anchorage. Work on mud pump 2. Change out agitator on Pit 5. Strap 5” liner. Build shelves in conex. Slip and cut drilling line 113’. Drift 5” liner. Work on rig doing various maintenance items. Pick and make up BHA #6. RIH from 302’ to 2038’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Adam Dorr DATE Sep 04, 2017 DEPTH 10144' PRESENT OPERATION Time drilling TIME 24:00 YESTERDAY 10099' 24 HOUR FOOTAGE 45' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2rr1 6" HDBS MM53D 13934535 5x12 10099' 45' 49.25 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 33.6 @ 10101' 1.9 @ 10125' 8.6 2.2 FT/HR SURFACE TORQUE 4585 @ 10100' 3853 @ 10124' 4327.5 4291.5 FT-LBS WEIGHT ON BIT 1 @ 10100' 0 @ 10125' 0.4 0.6 KLBS ROTARY RPM 119 @ 10138' 79 @ 10134' 115.1 108.3 RPM PUMP PRESSURE 2345 @ 10104' 1171 @ 10133' 1943.7 1533.0 PSI DRILLING FLUIDS REPORT DEPTH 10142' MW 9.35 VIS 74 PV 28 YP 11 FL 3.4 Gels 8/17/19 CL- FC 0/3 SOL 7.9 SD OIL 78.3/21.7 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 10 @ 10100' 4 @ 10135' 6.2 TRIP GAS 151 (from top of circulation) CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 1506 @ 10100' 197 @ 10136' 427.4 CONNECTION GAS HIGH 0 ETHANE (C-2) 5 @ 10100' 1 @ 10140' 2.9 AVG 0 PROPANE (C-3) 4 @ 10119.00000 0 @ 10125.00000 1.6 CURRENT 0 BUTANE (C-4) 3 @ 10120' 0 @ 10111' 1.0 CURRENT BACKGROUND/AVG 3 to 4/3.5 PENTANE (C-5) 5 @ 10120' 0 @ 10122' 1.1 HYDROCARBON SHOWS None INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Sandstone/Sandstone; Tuffaceous Siltstone/Claystone; Coal; Cement; Soltex sludge PRESENT LITHOLOGY @ 10145': 10% Sandstone; 30% Tuffaceous Claystone; 10% Tuffaceous Siltstone; 10% Coal; 40% Cement DAILY ACTIVITY SUMMARY Continue to RIH from 2038’ to 9668’. Wash and ream from 9668’ to 9771’ (packing off at 9771’). Wash and ream from 9771’ to 10099’ (cement stringers from 9771’ to 9928’ with associated packing off issues).Time drill from 10099’ to 10135’. Bring WOB and ROP up from 10135’ to 10146’. Start over time drilling from 10120’ to 10144’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 05, 2017 DEPTH 10533' PRESENT OPERATION POOH TIME 24:00 YESTERDAY 10144' 24 HOUR FOOTAGE 389' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10437.31' 39.04 130.29 9711.13' 10374.15' 36.28 130.32 9661.14' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2rr1 6" HDBS MM53D 13934535 5x12 10099' 10533' 434' 20.5 Directional DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 378.3 @ 10524' 1.6 @ 10151' 69.8 63.3 FT/HR SURFACE TORQUE 8995 @ 10303' 3114 @ 10379' 5832.5 6991.6 FT-LBS WEIGHT ON BIT 12 @ 10531' 1 @ 10161' 6.0 9.7 KLBS ROTARY RPM 120 @ 10384' 50 @ 10379' 108.7 99.7 RPM PUMP PRESSURE 1890 @ 10380' 1070 @ 10409' 1520.3 1416.2 PSI DRILLING FLUIDS REPORT DEPTH 10533' MW 9.40 VIS 73 PV 25 YP 10 FL 3.6 Gels 7/14/17 CL- FC 0/3 SOL 8.8 SD OIL 79.5/20.5 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 219 @ 10524' 1 @ 10200' 50.0 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 39232 @ 10526' 220 @ 10146' 7923.9 CONNECTION GAS HIGH 0 ETHANE (C-2) 546 @ 10324' 0 @ 10202' 185.6 AVG 0 PROPANE (C-3) 231 @ 10325' 0 @ 10157' 83.6 CURRENT 0 BUTANE (C-4) 79 @ 10427' 0 @ 10179' 27.9 CURRENT BACKGROUND/AVG 4-8/6 PENTANE (C-5) 15 @ 10329' 0 @ 10501' 1.9 HYDROCARBON SHOWS None to Trace INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 10408' to 10452' Sand/Sandstone 23 to 64 Weak crush cuts from select cuttings more fluorescent than OBM background fluorescence LITHOLOGY Sand/Sandstone/Tuffaceous Sandstone; Tuffaceous Claystone/Siltstone; Coal PRESENT LITHOLOGY @ 10533': 10% Tuffaceous Sandstone; 80% Coal; 10% Tuffaceous Siltstone DAILY ACTIVITY SUMMARY Time drill from 10144’ to 10190’ (Sidetracked at 10145’). Drill from 10190’ to 10533’ (hard spot at 10378’). Trouble shoot MWD. Pull 2 stands to 10411’. Circulate bottoms up. POOH from to 8359’. Pump dry job. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 06, 2017 DEPTH 10533' PRESENT OPERATION RIH TIME 24:00 YESTERDAY 10533' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10437.31' 39.04 130.29 9711.13' 10374.15' 36.28 130.32 9661.14' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2rr1 6" HDBS MM53D 13934535 5x12 10099' 10533' 434' 20.5 1-2-BT-T-X-I-WT-BHA Directional 4 6" Varel V516DX 4009138 3x11, 2x13 10533' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH 10533' MW 9.40 VIS 109 PV 24 YP 10 FL 3.6 Gels 8/15/17 CL- FC 0/3 SOL 8.3 SD OIL 79.9/20.1 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ AVG PROPANE (C-3) @ @ CURRENT BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 4-8/6 PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY @ 10533': 10% Tuffaceous Sandstone; 80% Coal; 10% Tuffaceous Siltstone DAILY ACTIVITY SUMMARY POOH from 8359’ to 302’. Stand back and lay down BHA to 119’. Upload radioactive sources. Download MWD. Lay down and stand back BHA. Break bit. Make up BHA, upload MWD, and shallow-hole test MWD. RIH from 313’ to 5898’ (fill pipe at 5586’). Make-up tong stuck. Trouble shoot make-up tong. RIH from 5898’ to 5961’. Continue to trouble shoot make-up tong issue. RIH to 6085’. Continue to trouble shoot make up tong issue. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 07, 2017 DEPTH 10933' PRESENT OPERATION Drilling TIME 24:00 YESTERDAY 10533' 24 HOUR FOOTAGE 400' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10877.84' 65.89 138.25 9977.78' 10814.44' 64.87 140.45 9951.36' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3x11, 2x13 10533' 400' 10.5 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 179.0 @ 10896' 4.5 @ 10629' 47.2 32.6 FT/HR SURFACE TORQUE 7911 @ 10606' 1688 @ 10597' 2542.5 6139.7 FT-LBS WEIGHT ON BIT 11 @ 10534' 2 @ 10609' 6.7 7.6 KLBS ROTARY RPM 99 @ 10895' 0 @ 10709' 27.3 100.0 RPM PUMP PRESSURE 2648 @ 10578' 481 @ 10606' 2341.7 2333.2 PSI DRILLING FLUIDS REPORT DEPTH 10917' MW 9.35 VIS 71 PV 27 YP 9 FL 3.4 Gels 8/15/18 CL- FC 0/3 SOL 8.6 SD OIL 79.6/20.4 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 130 @ 10898' 13 @ 10544' 59.5 TRIP GAS 87 @ 10533' CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 19242 @ 10897' 1982 @ 10544' 8848.6 CONNECTION GAS HIGH 0 ETHANE (C-2) 736 @ 10896' 15 @ 10543' 317.0 AVG 0 PROPANE (C-3) 477 @ 10896' 8 @ 10542' 194.4 CURRENT 0 BUTANE (C-4) 194 @ 10896' 0 @ 10537' 78.5 CURRENT BACKGROUND/AVG 18-43/29 PENTANE (C-5) 57 @ 10896' 0 @ 10544' 18.2 HYDROCARBON SHOWS None to Fair INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 10698' to 10715' Sand/Sandstone 41 to 130 100% dull to moderately bright yellow sample fluorescence; apparent oil staining; some visible interstitial oil in cracked-open sandstone cuttings LITHOLOGY Tuffaceous Sandstone; Conglomeritic Sandstone; Sandstone; Sand; Tuffaceous Claystone PRESENT LITHOLOGY @ 10915': 20% Tuffaceous Sandstone; 20% Sandstone; 60% Sand DAILY ACTIVITY SUMMARY Continue to trouble shoot make up tong issue. Finagle a solution. RIH from 5898’ to 10356’. Wash and ream from 10356’ to 10533'. Drill from 10533’ to 10933’. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 08, 2017 DEPTH 11867' PRESENT OPERATION Drilling TIME 24:00 YESTERDAY 10933' 24 HOUR FOOTAGE 934' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11811.67' 59.30 129.62 10381.55' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3x11, 2x13 10533' 1334' 24.7 Inc DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 250.7 @ 11743' 1.8 @ 11072' 81.6 141.0 FT/HR SURFACE TORQUE 8464 @ 11833' 0 @ 10957' 5388.2 7661.5 FT-LBS WEIGHT ON BIT 18 @ 11033' 2 @ 11104' 8.8 2.8' KLBS ROTARY RPM 100 @ 10924' 0 @ 10931' 59.1 79.3 RPM PUMP PRESSURE 3223 @ 11834' 2128 @ 11114' 2642.2 3026.0' PSI DRILLING FLUIDS REPORT DEPTH MW VIS PV YP FL Gels CL- FC SOL SD OIL MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 196 @ 11510.00000 14 @ 11831.00000 78.0 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 32113 @ 11666' 1306 @ 11830' 11382.5 CONNECTION GAS HIGH 0 ETHANE (C-2) 810 @ 11516' 30 @ 11830' 327.3 AVG 0 PROPANE (C-3) 592 @ 11509' 35 @ 11852' 237.8 CURRENT 0 BUTANE (C-4) 303 @ 11509' 34 @ 11851' 118.1 CURRENT BACKGROUND/AVG 15-50/42 PENTANE (C-5) 99 @ 11516' 10 @ 11852' 41.9 HYDROCARBON SHOWS None to Fair INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 10715' to 11645' Sand/Sandstone 28 to 196 Sample and cut fluorescences above OBM background; appears oil stained; occasional visible oil LITHOLOGY Tuffaceous Sandstone/Sandstone/Conglomeritic Sandstone/Sand; Tuffaceous Siltstone/Claystone; Carbonaceous Shale; Coal PRESENT LITHOLOGY @ 11850': 10% Tuffaceous Sandstone; 20% Sandstone; 10% Sand; 50% Tuffaceous Siltstone; 10% Tuffaceous Claystone DAILY ACTIVITY SUMMARY Drill from 10933’ to 11867’, mad passing every slide. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 09, 2017 DEPTH 11913' PRESENT OPERATION At shoe, after BOP test TIME 24:00 YESTERDAY 11867' 24 HOUR FOOTAGE 46' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 11873.58 57.92 129.95 10414.00 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3X11, 2X13 10533' 1380' 25.7 iNC DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 126.7 @ 11879' 8.1 @ 11906' 56.1 16.3 FT/HR SURFACE TORQUE 7224 @ 11896' 6061 @ 11862' 6704.9 6188.6 FT-LBS WEIGHT ON BIT 12 @ 11865' 4 @ 11913' 9.2 4.9 KLBS ROTARY RPM 79 @ 11865' 79 @ 11857' 81.2 79.9 RPM PUMP PRESSURE 2937 @ 11859' 2737 @ 11881' 2872.9 2759.1 PSI DRILLING FLUIDS REPORT DEPTH 11913' MW 9.40 VIS 86 PV 27 YP 10 FL 3.4 Gels 9/18/23 CL- FC 0/3 SOL 7.9 SD OIL 81.1/18.9 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 14 @ 11863' 11 @ 11855' 13.7 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 1847 @ 11911' 1297 @ 11881' 1579.3 CONNECTION GAS HIGH 0 ETHANE (C-2) 34 @ 11862' 15 @ 11888' 24.3 AVG 0 PROPANE (C-3) 30 @ 11871' 20 @ 11903' 25.8 CURRENT 0 BUTANE (C-4) 32 @ 11862' 23 @ 11898' 28.9 CURRENT BACKGROUND/AVG 5-8/6 PENTANE (C-5) 23 @ 11872' 7 @ 11912' 14.9 HYDROCARBON SHOWS None INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceou Sandstone/Sandstone/Sand; Tuffaceous Siltstone/Sandstone PRESENT LITHOLOGY @ 11910': 10% Sandstone; 20% Sand; 50% Tuffaceous siltstone; 20% Tuffaceous Claystone DAILY ACTIVITY SUMMARY Drill from 11867’ to 11913’. Pump high vis sweep and circulate around (10 barrels late, 10% increase in flow). POOH from 11913’ to 11285’. Retake surveys while pumping out from 11285’ to 11095’. POOH from 11095’ to 10730’. Retake survey at 10730’. Mad pass from 10669’ to 10612’. POOH from 10612’ to 8427’. Prepare for BOP test. Test BOP. Cut and slip 169’ of drilling line. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 10, 2017 DEPTH 12375' PRESENT OPERATION Drilling TIME 24:00 YESTERDAY 11913' 24 HOUR FOOTAGE 462' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12307.39' 73.99 138.71 10610.95' 12245.83' 69.63 137.45 10591.74' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3x11, 2x13 10533' 1842' 36.95 Inc DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 207.3 @ 12341' 3.0 @ 12037' 46.4 21.5 FT/HR SURFACE TORQUE 8229 @ 12356' 1 @ 12266' 4964.0 6648.5 FT-LBS WEIGHT ON BIT 25 @ 12037' 2 @ 11976' 8.3 12.1 KLBS ROTARY RPM 80 @ 12317' 0 @ 12261' 43.9 79.8 RPM PUMP PRESSURE 2879 @ 12356' 2438 @ 11975' 2758.4 2700.2 PSI DRILLING FLUIDS REPORT DEPTH 12319' MW 9.30 VIS 78 PV 25 YP 13 FL 3.3 Gels 10/20/28 CL- FC 0/3 SOL 7.9 SD OIL 81.1/18.9 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 66 @ 12006' 2 @ 12166' 11.1 TRIP GAS CUTTING GAS @ @ WIPER GAS 93 @ 11913' CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 11637 @ 12349' 613 @ 12166' 1856.1 CONNECTION GAS HIGH 0 ETHANE (C-2) 51 @ 12006' 1 @ 12114' 8.6 AVG 0 PROPANE (C-3) 18 @ 12006' 0 @ 12307' 3.6 CURRENT 0 BUTANE (C-4) 16 @ 12006' 0 @ 12330' 1.9 CURRENT BACKGROUND/AVG 2-6/4.5 PENTANE (C-5) 10 @ 12006' 0 @ 11921' 0.9 HYDROCARBON SHOWS None INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous Sandstone/Sandstone/Sand; Tuffaceous Siltstone/Claystone; Coal; Carbonaceous Shale PRESENT LITHOLOGY @ 12360': 10% Sandstone; 40% Tuffaceous Siltstone; 50% Tuffaceous Claystone DAILY ACTIVITY SUMMARY Service rig. RIH from 8427’ to 11857’. Break circulation (occasionally packing off). Wash and ream from 11857’ to 11913’. Drill from 11913’ to 12375’ (Mad Passing all slides). CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Steve Lawrence, Clint Montague DATE Sep 11, 2017 DEPTH 12906' PRESENT OPERATION Drilling TIME 24:00 YESTERDAY 12375' 24 HOUR FOOTAGE 531' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 12866.27' 83.69 138.09 10736.80' 12801.01' 81.94 137.82 10728.64' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3x11, 2x13 10533' 2373' 52.4 Inc DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 226.6 @ 12411' 1.7 @ 12717' 47.8 27.1 FT/HR SURFACE TORQUE 8841 @ 12841' 119 @ 12773' 5137.2 7419.5 FT-LBS WEIGHT ON BIT 19 @ 12638' 0 @ 12734' 10.7 11.2 KLBS ROTARY RPM 80 @ 12720' 0 @ 12592' 46.3 79.4 RPM PUMP PRESSURE 3232 @ 12653' 2543 @ 12476' 2925.6 2960.3 PSI DRILLING FLUIDS REPORT DEPTH 12898' MW 9.30 VIS 78 PV 26 YP 11 FL 3.5 Gels 10/21/26 CL- FC 0/3 SOL 8.0 SD OIL 82.2/17.8 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 31 @ 12763' 0 @ 12645' 9.3 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 5931 @ 12762' 425 @ 12612' 1587.7 CONNECTION GAS HIGH 0 ETHANE (C-2) 20 @ 12906' 0 @ 12584' 5.4 AVG 0 PROPANE (C-3) 13 @ 12883' 0 @ 12565' 2.3 CURRENT 0 BUTANE (C-4) 5 @ 12409' 0 @ 12700' 0.4 CURRENT BACKGROUND/AVG 1-8/6 PENTANE (C-5) 6 @ 12719' 0 @ 12575.00000 0.5 HYDROCARBON SHOWS Mostly None to one very poor trace INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 12381' to 12450' Sand/Sandstone 6 to 20 Oil indicators very slightly exceeding background OBM contamination LITHOLOGY Tuffaceous Sandstone/Sandstone/Conglomeritc Sand/Sand; Tuffaceous Siltstone/Claystone; Coal PRESENT LITHOLOGY @ 12900': 20% Tuffaceous Sandstone; 20% Sandstone; 10% Conglomeritic Sand; 40% Sand; 10% Tuffaceous Siltstone DAILY ACTIVITY SUMMARY Drill from 12375’ to 12924’ (Mad Passing all slides). CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster Hilcorp Alaska LLC Granite Point Platform DAILY WELLSITE REPORT GP 22-13RD3 REPORT FOR Rick Brumley, Clint Montague DATE Sep 12, 2017 DEPTH 12956' PRESENT OPERATION Laying down BHA TIME 24:00 YESTERDAY 12924' 24 HOUR FOOTAGE 32' CASING INFORMATION 7" @ 8496' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH Projected @ 12956' 84.56 139.17 10745.65' 12911.59' 84.56 139.17 10741.44' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" Varel V516DX 4009138 3x11, 2x13 10533' 12956' 2423' 54.75 6-8-RO-A-X-2-BT-PR PR DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 51.6 @ 12953' 6.2 @ 12925' 25.5 19.4 FT/HR SURFACE TORQUE 8086 @ 12956' 6533 @ 12933' 7732.6 8086.1 FT-LBS WEIGHT ON BIT 17 @ 12947' 9 @ 12913' 12.4 16.7 KLBS ROTARY RPM 101 @ 12937' 80 @ 12907' 102.5 101.3 RPM PUMP PRESSURE 3234 @ 12914' 2986 @ 12907' 3197.2 3181.2 PSI DRILLING FLUIDS REPORT DEPTH 12956' MW 9.40 VIS 102 PV 41 YP 13 FL 3.4 Gels 10/21/24 CL- FC 0/3 SOL 9.1 SD OIL 82.0/18.0 MBT pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 19 @ 12907' 6 @ 12934' 11.6 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 2981 @ 12907' 744 @ 12935' 1543.6 CONNECTION GAS HIGH 0 ETHANE (C-2) 79 @ 12956' 6 @ 12935' 18.9 AVG 0 PROPANE (C-3) 13 @ 12956' 3 @ 12935' 8.8 CURRENT 0 BUTANE (C-4) 5 @ 12936' 0 @ 12940' 0.3 CURRENT BACKGROUND/AVG 6-8/7 PENTANE (C-5) 1 @ 12931' 0 @ 12932' 0.3 HYDROCARBON SHOWS None INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous Sandstone/Sandstone/Conglomeritic Sand/Sand; Tuffaceous Siltstone/Coal PRESENT LITHOLOGY @ 12956': 10% Tuffaceous Sandstone; 30% Sandstone; 50% Sand; 10% Tuffaceous Siltstone DAILY ACTIVITY SUMMARY Drill from 12924’ to 12956’ (Mad Passing all slides). ROP stopped at 12956’. Circulate high viscosity lube sweep to bit, attempt to drill, no good. Finish circulating sweep. POOH from 12756’ to 1306’. Lay down 32 joints of drill pipe. Rack back HWDP, jars, and collars. Remove nuclear sources. Download MWD. Lay down remaining BHA. Clean and clear rig floor. CANRIG PERSONNEL ON BOARD 4 DAILY COST $2755 REPORT BY Paul Webster