Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-243
Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/18/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-05A (PTD 184-243) Completion Record Perf 09/14/2021 Please include current contact information if different from above. 37' (6HW Received By: 12/07/2021 By Abby Bell at 3:44 pm, Dec 07, 2021 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED JAN 0 8 2019 1. Operations Abandon LJ Plug Perforations LJ Fracture StimulateLJ Pull Tubing Li s u down LJ Performed: Suspend ❑ Perforate ❑✓ Other Stimulate❑ Alter Casing ❑ C ange Approved Program ❑ Plug for Redrill ❑ arforate New Pool ❑ Repair Well❑ Re-enter Susp Well ❑ Other: Convert to Jet Pump 21 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska LLC Development ❑✓ Stratigraphic❑ Exploratory ❑ Service ❑ 184-243 3. Address: 3800 Centerpoint Dr, Suite 1400 Anchorage, 6. API Number: AK 99503 50-029-21244-01-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0047434 MILNE PT UNIT C -05A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A MILNE POINT / KUPARUK RIVER OIL 11. Present Well Condition Summary: Total Depth measured 11,200 feet Plugs measured N/A feet true vertical 7,350 feet Junk measured 10,950 feet 8,530, 8,540, Effective Depth measured 11,012 feet Packer measured 8,721 &10,517 feel 5,872, 5,881, true vertical 7,220 feet true vertical 5,965 & 6,887 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 13-3/8" 115' 115' N/A N/A Surface 5,985' 9-5/8" 6,019' 4,500' 6,870psi 4,760psi Production 11,058' 7" 11,091' 7,275' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2# / L-80 / TC -II 10,588' 6,933' (2) HP Paragon II 7" x 3-1/2" HES TNT Packers and SSSV (type, measured and true vertical depth) BOT'HB' See Above N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 1,660 0 Subsequent to operation: 87 49 142 1,860 163 14. Attachments (required Per 20 arc 25.070, 25.071, s 25.283) 15. Well Class after work: Daily Report of Well Operations ❑✓ Exploratory[] Development ❑✓ Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ✓ Gas WDSPL Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318-319 Authorized Name: Chad Helgeson Contact Name: Stan Porthole Authorized Title: Operations Manager Contact Email: Sporhola@hilcorp.cOrfl Authorized Signature: Date. 1/7/2019 Contact Phone: 777-8412 1 3¢DMS�. JAN 0 9 2019 Form 10-404 Revised 412017 � �( 1 Submit Original Only 6 7 IkielnTuwv@ 9.86T -Maus MNID= 2.750f'@ — 2J Last Tag@10,98% an9/12/2013– See FM Detail 7" 13 14 15 ii i6 Gain lA-TW @9,794 17 Ce,ailinlA- 16 gIItm@10,61T 19 TO=Y1,2W (NID)/TD=7,350'(=) PBTD=12,905' (MD) / PBTD=7,220'ITVD) PERFORATION Ut V\R Sands I Top (MD) I Btm (MD) I Top (TVD) Btm (TVD) FT Shot Date Status 1 —1 ,a• e. 1. Rooerf Kuparuk STIMULATION SUMMARY 9/25185-2D,0001b,away-Screenraced Out. p nt ed 1/31/85-polyemulsion F,... ted,no roppa pumped P FISH DETAIL 1/8/85-21Y -S' Casing Gun - Bottom B' Potentialiy Loaded Still est ±10,950' 9/24/97-Lost.8125 Grapple In Hole Attem In to Fish GLV at 3,283 Lost D&D Hole Finder in Rat hole GENERALWELLINFO API: 50-029-21244-01-00 Milled and Completed by Alaska United 83 -1-19-1985 RWOb Doyon 16-4/5/2014 Perf -8/27/2014 Perf 112/12/2019 & Install let Pump 12/18/2018 Size Revised By: TDF 1/7/2019 Milne Point Unit Well: SCHEMATIC Last Completed: 4/5/2014 PTD: 184-243 FLIcorPAlae]aa,Li.0 TREE &WELLHEAD WELL INCLINATION DETAIL Irrtial KB Elev.: 5Y (Alaska United N3) Tree 3-1/8' SM FMC KOP @ 475 Maz Hole Agle = @ 5,600'Tubing HF:2261' lhead 11' x7' 5M FMC NSR, W/ 3.5' FMC n CIW 3S' H BPV Profile Hole Anglethru perforations=46'OPEN Han er HOLE / CEMENT DETAIL 9-5/8'950o'tl & 2,000 sz Permafr9-5/8' x Y 17 bbis, 2000sks Permafrost C In Annulus oohs 7• 1370sxGass "G"InS-1/2"Hole CASING DETAIL IWIIIbM� 3 Size Type Wt/Grade/Conn ID Top Btm BP13-3/8' S.6g1" Surface 6,019' 0.0732 Conductor 48R / H-40 / N/A N/A" Surface 115' N/Aa9-5/8" Surface 47#/L-/BTRC 26#/L-80/BTRC 6.276" Surface 110,91' 0TUBING 7° Production DETAIL 5 3-1/2' Tubing 9.28/L -B -/TC -II 2.992' Surface 6,635' 0.0087 ¢lul=l RV f1FTAIL 6 7 IkielnTuwv@ 9.86T -Maus MNID= 2.750f'@ — 2J Last Tag@10,98% an9/12/2013– See FM Detail 7" 13 14 15 ii i6 Gain lA-TW @9,794 17 Ce,ailinlA- 16 gIItm@10,61T 19 TO=Y1,2W (NID)/TD=7,350'(=) PBTD=12,905' (MD) / PBTD=7,220'ITVD) PERFORATION Ut V\R Sands I Top (MD) I Btm (MD) I Top (TVD) Btm (TVD) FT Shot Date Status 1 —1 ,a• e. 1. Rooerf Kuparuk STIMULATION SUMMARY 9/25185-2D,0001b,away-Screenraced Out. p nt ed 1/31/85-polyemulsion F,... ted,no roppa pumped P FISH DETAIL 1/8/85-21Y -S' Casing Gun - Bottom B' Potentialiy Loaded Still est ±10,950' 9/24/97-Lost.8125 Grapple In Hole Attem In to Fish GLV at 3,283 Lost D&D Hole Finder in Rat hole GENERALWELLINFO API: 50-029-21244-01-00 Milled and Completed by Alaska United 83 -1-19-1985 RWOb Doyon 16-4/5/2014 Perf -8/27/2014 Perf 112/12/2019 & Install let Pump 12/18/2018 Size Revised By: TDF 1/7/2019 Hilcorp Alaska, LLC t4Weekly Operations Summary API Number Well Permit Number 12/1 /2018E12nl1d Well Name R g184-243 MP C_ 5A t-UTM 50-029-21244-01-00 Daily Operationo—rrs. 12/12/2018 Wednesday10 ELTa'10 I. MIRU Pollar2014 and estperforatbrice 10,89tor to4' 10 904oSITPa 250/4 R11,800 psi. No changeaPOOH? LD gun sAll shots fired. PU 101ate to Bg n. RIH dated 8/28/sh ange i. w/ 10' gun. Perforate 1010 804 105 TP = 11800 psi Nochange. POOH.LD gunsDAll shotlf red. Rig down E-01 neun. RIH w/ 20 eun. Pert do activity to report. 12/16/2018 Sunday 2.70", 51 x 2.50" DRIVE DOWN BAILEK, PT PCE 250L 4,0001-1". DIFT 1/2" BLB 2T50" MAGNET, DRIFT &BRUSBG W H TBG BETWE N 8490' SLM TO 8650' S VI FOR 30min8RE SLM OVER 10901 METAL SHAVINGS ON BTM OF MAGNET. 12/17/2018 Monday Pressure tested 4,000# high / 250# low. Bottom packer set for jet pump. Packer set mid element at 8,541', CCL to packer= 10.67', CCL stop depth = 8530.3'. 12/18/2018 -Tuesday ** 3.5"" PARAGON II PACKER W/JET "**WELL SHUT IN UPON ARRIVAL, PT PCE: 250L / 4000H .RUN 3.5"" GR, HES 2.5"" DPU, PUMP PATCH TO 8538' SLM, SET PACKER, SEE WEIGHT LOSS . TOP OF UPPER PACKER @ 8520' MD, TOP OF LOWER PACKER cFT (COD 8540' MD. WELL HISTORY FILE COVER PAGE XHVZS This page identifies oversize material and digital information available for this individual Well History file and weather or not it is available in the LaserFiche file. Please insure that it remains as the first page in this file. Iff ;;)f3 Well History File # Digital Data Added to LaserFiche File 0 CD's - # - 0 DVD's - # - 0 Diskettes - # 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No Oversized Material Added to LaserFiche File 0 Maps # 0 Mud Logs # - 0 Other # - 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No General Notes or Comments about this file. If any of the information listed above is not available in the LaserFiche file you may contact the Alaska Oil & Gas Conservation Commission to request copies. Please call Robin Deason at (907) 793-1225 if you have any questions or information requests regarding this file. STATE OF ALASKA RECEIVED • SKA OIL AND GAS CONSERVATION Ck.....I/1ISSION • REPORT OF SUNDRY WELL OPERATIONS MAY Q 1 2014 AOGCC 1. Operations Performed: ❑Abandon Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ❑Alter Casing ®Pull Tubing 0 Stimulate-Frac 0 Waiver 0 Other ❑Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska)Inc. 0 Exploratory 0 Stratigraphic • 184-243 3. Address: ®Development 0 Service 6. API Numbe a P.O. Box 1 6612 Anchorage,Alaska 99519-6612 o 9 g 50.029-21244-01-00 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 047434 . MPC-05A . 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): • CBL Milne Point/Kuparuk River Oil 11. Present well condition summary: Total depth: measured • 11200' feet Plugs:(measured) None feet true vertical 7349' feet Junk:(measured) Unknown feet Effective depth: measured • 11012' feet Packer: (measured) 8721', 10517' feet true vertical 7220' feet Packer: (true vertical) 5965',6887' feet Casing Length Size MD ND Burst Collapse Structural Conductor 80' 13-3/8" 35'- 115' 35'- 115' 1740 750 I Surface 5985' 9-5/8" 34'-6019' 34'-4500' 6870 4760 Intermediate Production 11058' 7" 33'- 11091' 33'-7275' 7240 5410 Liner SCANNED JUL 1 6 Z014, Perforation Depth: Measured Depth: 10784'-10902' feet True Vertical Depth: 7064'-7145' feet Tubing(size,grade,measured and true vertical depth): 3-1/2",9.2# L-80 10588' 6933' Packers and SSSV(type,measured and true vertical depth): 7"x 3-1/2"HES TNT Packer; 8721'; 5965'; 7"x 3-1/2"BOT HB Packer 10517' 6887' 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: RBDM MAY 1 J 2014 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 1760 0 Subsequent to operation: 0 0 0 1340 - 0 14.Attachments: 0 Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic ®Development 0 Service ®Daily Report of Well Operations 16. Well Status after work: • ®Oil 0 Gas 0 WDSPL ®Well Schematic Diagram 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: James Smith,564-5616 Email:James.Smith7@bp.com N/A Printed Name: Joe Lastu Title: Drilling Technologist Signature: Phone: 564-4091 Date: 4fcof;i Form 10-404 Revised 10/2012Vi-F 5/72 l/ty ,e/7,.. 7/ Submit Original Only MPC-05A, Well History (Pre-Rig Workover) Date Summary 02/05/14 T/I/O=SSV/780/10 Temp=SI PPPOT-T(PASS) PPPOT-IC(PASS) Pre RWO. PPPOT-T: Stung into test void (0+psi.). Bled void to 0 psi. Functioned LDS,all moved freely(1"). Pumped through void, good returns. Pressured test void to 5000 psi. Lost 150 psi. in 15 min. Lost 50 psi. in second 15 min. (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test void(0+psi.). Bled void to 0 psi. Functioned LDS,all moved freely(1"). Pumped through void, good returns. Pressured test void to 3500 psi. Lost 0 psi. in 30 min. (PASS). Bled void to 0 psi. 02/10/14 T/I/0=1800/1800/0 Flush flowline with 5 bbls diesel (Pre RWO) Fwhp's=1800/1800/0 FP tag hung on wing, SV,WV, SSV=S/I MV=O IA, OA=OTG. 02/13/14 RAN MULTIPLE BLB CONFIGURATIONS, BRUSHED RESTRICTIONS @ 9813'SLM-10050'SLM. RAN 2.805"G-RING,TAGGED D-NIPPLE @ 10555'MD. CURRENTLY IN HOLE W/PDS 24 ARM CALIPER. 02/14/14 RAN PDS 24 ARM CALIPER AS PER PROGRAM (GOOD DATA). RAN SBHPS AS PER PROGRAM (GOOD DATA). SET 3-1/2"CA-2 BLANKING PLUG IN D-NIPPLE @ 10,555'MD. CMIT Tx IA TO 3500 PSI PASSED. 02/15/14 DUMP BAILED SLUGGITS FROM 10510'SLM TO 10503'SLM. SET 3 1/2"JUNK BASKET @ 10503' SLM. 02/25/14 PULLED 3.5"JUNK CATCHER FROM 10491'SLM. RAN 2.25"PUMP BAILER.BAILED FROM 10503' SLM TO 10510'SLM.RECOVERED ONE GALLON OF SLUGGITS. R/D DUE TO PRIORITY RIG JOB.RETURN ON LATER DAY. 02/26/14 MADE SEVERAL RUNS W/2.25" PUMP BAILER TO 2.75"CA-2 PLUG @ 10555'MD.RECOVERED ONE GALLON OF SLUGGITS. 02/27/14 PULL PRONG AND PLUG FROM 10555' MD. RAN SBHPS PER PROCEDURE, GOOD DATA RECOVERED. PULLED OFF JOB COME BACK LATER TO DO ANOTHER SBHP. 03/06/14 RAN SBHPS AS PER PROCEDURE. HELD MAN DOWN&FIRE DRILLS. SET 2.75"CA-2 BLANKING PLUG @ 10555'MD. PERFORM CMIT-T x IA TO 3500 PSI, PASSED(see data tab). DUMPED BAILED SLUGGITS FROM 10555'MDTO 10543'MD. 03/08/14 Establish communication down Flowline. Suspected Ice plug in line. Pumped 0.1 bbl neat methanol down FL, pressured up to 650 psi, unable to establish comm. 03/09/14 START RIGUP FOR BOND LOG AND TUBING CUT. 03/10/14 LOG RCBL FROM TAG OF 10544'TO 9000' FOUND TOP OF CEMENT AT 9440'. 03/11/14 SHOT 2'OF TUBING PUNCH AT 8815'-8817. CUT TUBING W/RCT CUTTER @ 8846'. WELL LEFT SHUT IN-NOTIFIED PAD OPERATOR OF WELL STATUS. 03/12/14 T/I/O=SSV/140/0 Work flowline ice plug (ice plug) Pumped .34 bbls meth into F/L. repressured multiple times to work through worm hole. Page 1 of 2 MPC-05A, Well History (Pre-Rig Workover) Date Summary 03/13/14 T/I/0=97/125/0 Work flowline ice plug, CMIT TxIA to 1000 psi PASSED(Pre-RWO) Pumped 15 bbls of neat meth down F/L to insure Ice plug was free. Pressured TxIA up to 1000 psi with 1.3 bbls 60/40 MW. TxIA lost 36/40 psi in 1st 15 min, and 9/10 psi in 2nd 15 min ,for a total loss of 45/50 psi in 30 min test. Bled back-1 bbl. Final WHP's 82/105/0 WV,SV,SSV=closed MV,IA,OA=open Pad op notified on departure. Page 2 of 2 North America-ALASKA-BP Page 1 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 3/25/2014 00:00 - 01:00 1.00 MOB P PRE PJSM,SECURE TREE AND PREP FOR RIG MOVE 01:00 - 02:00 1.00 MOB P PRE PJSM,MOVE OFF OF WELL MPC-41 -NOTIFY PAD OPERATOR,WSLAND TOUR PUSHER PRESENT • 02:00 - 03:30 1.50 MOB P PRE STAGE EQUIPMENT AROUND WELL -SPOT RIG OVER WELL MPC-05,SHIM AND LEVEL RIG 03:30 - 07:00 3.50 WHSUR P DECOMP MOVE IN CUTTING BOX,R/U CREW TRAILER AND DIESEL TANK -R/U AND TEST CIRCULATION MANIFOLD AND LINES IN CELLAR R/U AND TEST HARD LINE TO FLOW BACK TANK -LOAD PITS WITH 12.4 PPG KWF ACCEPT RIG AT 04:00 ON MPC-05A 07:00 - 07:30 0.50 WHSUR P DECOMP T.T WELL KILL DRILL/T.T.RIG EVAC (METHANE GAS) 107:30 - 11:00 3.50 WHSUR P DECOMP PJSM,TBG=280 PSI/IA=210 PSI CIRC OUT FREEZE PROTECT W/12.4 PPG SODIUM BROMIDE PUMPED @ 3 BPM/900 PSI -4 BPM W/925 PSI&2 BPM W/FCP=1000 11:00 - 12:00 1.00 WHSUR, P DECOMP MONITOR WELL. - ------------------------- WELL IS OUT OF BALANCE 12:00 - 13:30 1.50 WHSUR P DECOMP ALLOW WELL TO U-TUBE. CONT.MONITOR WELL UNTIL STATIC 13:30 - 16:30 3.00 WHSUR P DECOMP PJSM,P/U LUBRICATOR AND M/U TO TREE -TEST LUB,250 LOW/4000 HIGH,5 MIN EA, CHARTED -INSTALL TWC,R/D LUBRICATOR -TEST TWC FROM ABOVE 250/3500 PSI,5 MIN,CHART 16:30 - 17:30 1.00 WHSUR P DECOMP BLOW DOWN AND R/D ALL CIRCULATING LINES AND MANIFOLD IN CELLAR -B/D AND R/D HARD LINE TO FLOW BACK TANK 17:30 - 19:30 2.00 WHSUR P DECOMP PJSM,BLEED ADAPTER VOID -N/D TREE,CLEAN AND INSPECT HANGER THREADS,3 1/2"EUE 8RD,10.5 RH TURNS BY HAND 19:30 - 22:00 2.50 BOPSUR P DECOMP PJSM,N/U BOPE,TURNBUCKLES,RISER, MOUSE HOLE,KOOMEY LINES,ETC -OPEN AND INSPECT LOWER RAM DOORS -PERFORM KOOMEY DRAW DOWN TEST -FUNCTION TEST HI-LOW BY-PASS -GREASE/SERVICE AND FUNCTION CHOKE AND MUD-CROSS • 22:00 - 23:00 1.00 BOPSUR P DECOMP C/O LOWER RAM PACKER AND TOP SEALS C/O LOWER D/S FLUID HINGE PIN SEAL 23:00 - 00:00 1.00 BOPSUR P DECOMP R/U TEST EQUIPMENT,FLOOR VALVES AND TEST JOINTS FOR BOPE TEST -FILL BOP AND CHOKE MANIFOLD BODY TEST DOOR SEALS AND CHOKE Printed 4/14/2014 11:07:08AM • North America-ALASKA-BP Page 2 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM 1 Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UW:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/26/2014 00:00 - 05:00 5.00 BOPSUR P DECOMP PJSM,TEST FOUR PREVENTER BOPE AND RELATED EQUIPMENT TEST BOPE ACCORDING TO AOGCC •t/ REGULATIONS AND DOYON PROCEDURES TEST ANNULAR WITH 3 1/2"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINUTES EACH,CHARTED -TEST 2 7/8"X 5"VARIABLE RAMS WITH 3 1/2" AND 4"TEST JOINT,250 PSI,4000 PSI,5 MIN, CHARTED -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,4000 PSI,5 'MIN,CHARTED -TEST WITH FRESH WATER 1-PERFORM ACCUMULATOR DRAW DOWN 'TEST -NO FAILURES -JOHN CRISP OF AOGCC WAIVED STATES t, RIGHT OF WITNESS FOR BOP TEST 05:00 - 06:00 1.00 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT. BLOW DOWN ALL LINES,VACUUM OUT STACK. RIG UP DUTCH RISER. 06:00 - 08:00 2.00 • WHSUR P DECOMP PJSM.RIG UP LUBRICATOR. -TEST LUBRICATOR @ 250/4000 PSI,5 MIN EACH,CHARTED. -PULL TWO WAY CHECK VALVE.(TBG PRESSURE=0 PSI). -LAY DOWN LUBRICATOR,LAY DOWN DUTCH RISER. 08:00 - 10:00 2.00 PULL P DECOMP PJSM.MAKE UP LANDING JT.SUCK OUT STACK. -RIG UP SCHLUMBERGER SPOOLING UNIT. -MAKE UP LANDING JT TO TUBING HANGER. -BACK OUT LOCK DOWN SCREWS. -PULL HANGER TO FLOOR,PULLED FREE @ 110K. -UP WT=110-115 K,ALL WEIGHTS INCLUDE 40K TOP DRIVE. 10:00 - 12:00 2.00 PULL P DECOMP PJSM.LINE UP TO CIRCULATE WELL THRU CHOKE,CLOSE ANNULAR PREVENTOR. -CIRCULATE @ 4 BPM/1670 PSI ICP. -PRESSURE INCREASED TO 2400 PSI, DIMINISHING RETURNS. -INDICATIONS OF PACKING OFF 12:00 - 14:00 2.00 PULL P DECOMP L/D TUBING HANGER,M/U TOP DRIVE -CBU lx,3 BPM=1850-2200 PSI POH 15',OBSERVE 40K OVERPULL, ATTEMPT TO SLACK OFF WITH PUMPS ON= UNABLE -PUMPS OFF,SLACK OFF OKAY,SET SLIPS AND L/D LANDING JOINT -C/O ELEVATORS,SLOWDOWN TOPD DRIVE 14:00 - 15:30 1.50 PULL P DECOMP ATTEMPT TO PULL 3 1/2"TUBING,WELL IS OUT OF BALANCE -R/U AND PUMP 12.5 PPG DRY JOB DOWN PIPE 15:30 - 16:00 0.50 PULL P DECOMP PULL 5 JOINTS,F/8846'T/8691'MD -PUWT=110K,OBSERVE 40K OVERPULLS Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 3 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE©52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 17:00 1.00 PULL P DECOMP RIU AND TEST CASING AND DOWN HOLE BARRIERS -1500 PSI,10 MINUTES=GOOD TEST -R/D TEST EQUIP,BLOW DOWN CHOKE AND KILL LINES 17:00 - 18:00 1.00 PULL P DECOMP POOH WITH 3 1/2"9.2#BUTRESS TUBING COMPLETION WITH ENCAPSULATED CONTROL LINE -F/8691'T/8381'MD,PUWT=110K-150K (SEE 40K OVERPULLS) -STOP POOH DUE TO CONTROL LINE NOT MOVING UPHOLE WITH TUBING STRING -DISCUSS OPTIONS WITH TOWN ENGINEERS 18:00 - 18:30 0.50 PULL P DECOMP PJSM,M/U CROSSOVERS NEEDED -M/U TOP DRIVE TO TUBING STRING -DISCUSS OPTIONS WITH TOWN ENGINEER 18:30 - 22:00 3.50 PULL P DECOMP BREAK CIRCULATION AND INCREASE RATE 'SLOWLY,2 BPM=700 PSI.3 BPM=1120 PSI -PUMP 20 BBL HI-VIS SURFACE TO SURFACE, ICP-3 BPM=1190 PSI,FCP-5 BPM=2190 PSI -NO RUBBER AT SHAKERS ON SWEEP RETURN 22:00 - 00:00 2.00 PULL P DECOMP PUMP 20 BBL HI-VIS SWEEP,ADD 4 DRUMS SAFE LUBE TO SYSTEM.6% -ICP-2 BPM=830 PSI,FCP-3 BPM=1680 PSI,UNABLE TO INCREASE RATE DUE TO PACKING OFF -24 HOUR FLUID LOSS=0 BBLS 3/27/2014 00:00 - 01:00 1.00 PULL P DECOMP CONTINUE CIRCULATING SAFE LUBE, 2 BPM =1210 PSI DISCUSS OPTIONS WITH TOWN ENGINEER -ATTEMPT TO PULL CONTROL LINE OUT OF HOLE WITH PIPE WITH TUGGER ASSIST CONTROL LINE PULLED IN TWO WITH MINIMAL PUWT,PULL BY HAND TO SURFACE -PULLED A TOTAL OF 465'OF CONTROL LINE BEFORE PARTING -WORK PIPE DOWN TO COLLAR, DISCONNECT AND BLOW DOWN TOP DRIVE -PUWT=110K,SOWT=75K 01:00 - 02:00 1.00 PULL P DECOMP POOH FROM 8381'TO 8003',(26 JOINTS OUT) -OBSERVE 40K OVER PULLS,PIPE IS PULLING TIGHTER AND TIGHTER -DISCUSS OPTIONS WITH TOWN ENGINEER 02:00 - 02:30 0.50 PULL P DECOMP RIG UP CIRCULATION EQUIPMENT -ATTEMPT TO CIRCULATE AT 1 BPM=2300 PSI,BLEED OFF -R/D CIRCULATION EQUIPMENT 02:30 - 04:30 2.00 PULL P DECOMP CONTINUE POOH F/8003'T/7854'MD(32 JOINTS OUT) -OBSERVE 100K OVERPULLS AT CONSISTENT INTERVALS ON EACH JOINT Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 4 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date • From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 06:00 1.50 PULL P DECOMP R/U CIRC LINES AND FLUSH BOP STACK -DRAIN BOP AND CHECK FOR DEBRIS -NO DEBRIS OBSERVED OR OTHER ANOMOLIES. -LAY DOWN JT#33(33 JOINTS OUT)AND MAKE UP CROSSOVERS&(1)JTS DRILL PIPE. -MAKE UP TOP DRIVE AND FURTHER DISCUSSIONS WITH TOWN ENGINEERS. 06:00 - 07:00 1.00 PULL P DECOMP PJSM.LINE UP TO REVERSE CIRCULATE.SET 15K ON PIPE WITH TOP DRIVE. -CLOSE ANNULAR AND ATTEMPT TO PUMP DOWN 3 1/2"TBG X 7"CASING ANNULUS. -PRESSURE UP TO 2500 PSI,1/2 BBL TO PRESSURE UP. -OBSERVE VERY SLOW BLEED OFF RATE WITH RETURNS TRICKLING FROM TUBING SIDE. -REPRESSURE SEVERAL TIMES WITH NO SIGNIFICANT CHANGES OBSERVED. 07:00 - 12:00 5.00 PULL P DECOMP DISCUSS OPTIONS WITH TOWN ENGINEERS. -CALL BAKER FISHING AND CONTINUE TO TRY VARIOUS TECHNIQUES TO FREE PIPE. -PARAMETERS INCLUDE MAX PULL UP TO 125K,MAX SLACK TO 25KAND MAX PRESSURE WHILE CIRCULATING OF 2500 PSI. -ALL UP AND DOWN WEIGHTS INCLUDE WEIGHT OF TOP DRIVE,(40K). -MIX(1)BBL OF SAFE LUBE IN 20 BBLS OF 12.4 PPG BRINE AND REVERSE CIRCULATE. -PRESSURING UP TO 2500 PSI AND ALLOWING TO BLEED OFF WITH SMALL AMOUNT OF RETURNS UP TUBING. • -LOSSES FOR LAST(12)HOURS=0 BBLS. 12:00 - 13:30 1.50 PULL P DECOMP SQUEEZE SAFE LUBE PILL DOWN IA, PRESSURE UP TO 2500 PSI RETURNS THROUGH TOP DRIVE 13:30 - 15:00 1.50 FISH P DECOMP BLEED OFF PSI,OPEN ANNULAR,MAKE UP TOP DRIVE TO TUBING -PERFORM BLIND BACK OFF PER BAKER REPAND WSL -POOH,RECOVER 11 JOINTS 3 1/2"TUBING (44 JOINTS OUT) 15:00 - 17:00 2.00 FISH P DECOMP CLEAN CLEAR RIG FLOOR -CHANGE ELEVATORS,BLOW DOWN TOP DRIVE,CHOKE KILL LINES -INSTALL 7 1/8"ID WEAR RING • 17:00 - 18:00 1.00 FISH P DECOMP MAKE UP BAKER BHA#1=ROPE SPEAR WITH 6"STOP,DRAIN SUB,BUMPER SUB, JAR -RIH,TAG TOP OF 3 1/2"STUB AT 343', ROTATE/WORK SPEAR -PICK UP 10'EACH TIME WITH NO INDICATION OF TORQUE OR INCREASE IN WEIGHT • 18:00 - 19:00 1.00 FISH P DECOMP POOH,NO CONTROL LINE RECOVERED -LAY DOWN BHA#1 ROPE SPEAR 19:00 - 20:30 1.50 FISH P DECOMP DISCUSS OPTIONS WITH TOWN ENGINEER -MOBILIZE BHA#2 TO RIG FLOOR Printed 4/14/2014 11:07:08AM • North America-ALASKA-BP Page 5 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 FISH P DECOMP PJSM,MAKE UP BHA#2=5 3/4"OVERSHOT W/4 1/4"BASKET GRAPPLE,BUMPER,JARS, COLLARS 21:30 - 22:00 0.50 FISH P DECOMP RIH WITH BHA#2 -TAG TOP OF 3 1/2"STUB AT 343' • -ENGAGE GRAPPLE -PERFORM BLIND BACK OFF 3 1/2"TUBING AS PER BAKER REP -PUWT=45K,SOWT=45K,ROTW=45K 22:00 - 23:00 1.00 FISH P DECOMP POOH TO BHA -RELEASE FROM 3 1/2"TUBING 23:00 - 00:00 1.00 PULL P DECOMP PJSM,LAY DOWN 6 JOINTS OF 3 1/2"TUBING -RIG DOWN 31/2"HANDLING EQUIPMENT PREPARE TO PICK UP ROPE SPEAR 3/28/2014 00:00 - 01:00 1.00 FISH P DECOMP PJSM,M/U BAKER BHA#3=ROPE SPEAR WITH 6"STOP,DRAIN SUB,BUMPER SUB, JAR -RIH,TAG CONTROL LINE AT 413'MD -ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP -PUWT=45K,SOWT=45K,ROTW=45K 01:00 - 02:00 1.00 FISH P DECOMP POOH WITH ROPE SPEAR BHA -RECOVER ROPE SPEAR FULL OF CONTROL LINE AND SS CLAMPS 02:00 - 03:00 1.00 FISH P DECOMP BAKER BHA RUN#4=ROPE SPEAR WITH 6" STOP,DRAIN SUB,BUMPER SUB,JAR -RIH,TAG CONTROL LINE AT 415'MD -ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP -POOH,-RECOVER CONTROL LINE AND SS CLAMPS 03:00 - 05:00 2.00 FISH P DECOMP BAKER BHA RUN#5=ROPE SPEAR BHA -RIH,TAG CONTROL LINE AT 436'MD -ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP,PUSH TO 472'MD -POOH,-RECOVER CONTROL LINE AND SS CLAMPS 05:00 - 06:00 1.00 FISH P DECOMP BAKER BHA RUN#6=ROPE SPEAR BHA -RIH,TAG CONTROL LINE -ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP -POOH,-RECOVER CONTROL LINE AND SS 'CLAMPS -PUWT=45K,SOWT=45K,ROTW=45K 06:00 - 07:00 1.00 FISH P DECOMP BAKER BHA RUN#6=ROPE SPEAR BHA -RIH,TAG CONTROL LINE ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP -WORK DOWN TO 528',TOP OF TUBING. -POOH,-RECOVER CONTROL LINE AND SS CLAMPS -PUWT=45K,SOWT=45K,ROTW=45K 07:00 - 08:30 1.50 FISH P DECOMP BAKER BHA RUN#6=ROPE SPEAR BHA -RIH,TAG CONTROL LINE -ENGAGE CONTROL LINE,WORK ROPE SPEAR PER BAKER REP -WORK DOWN TO 528',TOP OF TUBING. -POOH,-ROPE SPEAR CLEAN OF CONTROL LINE,NO RECOVERY. -PUWT=45K,SOWT=45K,ROTW=45K Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 6 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. I UWI:500292124400 Active datum:Original KBE©52.00usft(above Mean Sea Level) _ Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) s (usft) 08:30 - 09:00 0.50 FISH P DECOMP UD ROPE SPEAR AND M/U OVERSHOT AND — IBASKET 09:00 GRAPPLE 11:00 2.00 FISH P DECOMP 'RIH,ENGAGE TOP OF 3 1/2"STUB AT 528'MD -PERFORM BACK OFF PER BAKER REP POOH WITH 3 1/2"TUBING FISH 111:00 - 12:00 ' 1.00 FISH P DECOMP RELEASE OVERSHOT FROM 3 1/2"TUBING -C/O ELEVATORS j j -POOH WITH 1 JOINT 3 1/2"TUBING NEW TOP OF FISH=560',3 1/2"TUBING PIN LOOKING UP 12:00 - 13:30 1.50 FISH P ' DECOMP M/U ROPE SPEAR BHA -RIH,TAG CONTROL LINE AT 558'MD ENGAGE CONTROL LINE,WORK ROPE ' SPEAR PER BAKER REP -POOH,RECOVER 29'CONTROL LINE 13:30 - 15:00 1.50 FISH P DECOMP UD ROPE SPEAR,M/U OVERSHOT WITH 3 1/2"BASKET GRAPPLE -RIH,TAG TOFAT560' -ATTEMPT BLIND BACK OFF,20 UH TURNS -JAR 5X AT 140K UP,UNSUCCESSFUL 15:00 - 16:00 1.00 FISH P DECOMP COMPLETE DERRICK INSPECTION -DISCUSS OPTIONS WITH TOWN ENGINEER 16:00 - 18:00 2.00 FISH P DECOMP CLOSE ANNULAR,CONTINUE JARRING AT 140K OPEN ANNULAR,ESTABLISH CIRCULATION -PUMP 20 BBL HI-VIS SWEEP,3 BPM=150 i PSI,5 BPM=1600 PSI ' -LARGE PIECES OF CONTROL LINE RUBBER AT SHAKERS S -CONTINUE JARRING AT 140K,BACK OUT PIPE=12 UH TURNS 18:00 18:30 0.50 FISH P DECOMP COMPLETE DERRICK INSPECTION -BLOW DOWN TOP DRIVE AND CHOKE MANIFOLD l 18:30 - 19:00 0.50 FISH P DECOMP POOH,TOP SUB OF OIL JAR UNSCREWED FROM OIL JAR MANDREL -CALL FOR NEW OIL JAR FROM BAKER 19:00 - 20:00 1.00 FISH P DECOMP DISCUSS OPTIONS WITH TOWN ENGINEER -CLEAN CLEAR RIG FLOOR OF SODIUM BROMIDE - 20:00 - 21:30 1.50 FISH P DECOMP RIH WITH OIL JAR TOP SUB -SCREW BACK INTO OIL JARS,RELEASE FROM 3 1/2"TUBING STUB -POOH,UD BAD JARS,M/U NEW JARS 21:30 - 22:30 1.00 FISH P DECOMP RIH,ENGAGE TOP OF FISH AT 560' -ATTEMPT BLIND BACK OFF,SEE NO MORE THAN 3K TORQUE WHILE TURNING LEFT -POOH,TOP SUB OF OIL JAR UNSCREWED FROM OIL JAR MANDREL 22:30 - 00:00 1.50 FISH P DECOMP RIH WITH OIL JAR TOP SUB -SCREW BACK INTO OIL JARS,RELEASE GRAPPLE FROM 31/2"TUBING STUB AND POOH -TORQUE ALL CONNECTIONS ON OIL JARS -CHECK OVERSHOT GRAPPLE FOR WEAR= GOOD Printed 4/14/2014 11:07:O8AM North America-ALASKA ,, BP , Page 7 of 15 Operation Summary Report ,,;: Common Well Name.MPC-05 AFE No • Event Type:WORKOVER(WO) Start Date 3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/29/2014 16:30 - 21:30 5.00 FISH N HMAN DECOMP PREP FOR CUTTING OPERATION. @ 15:45 HRS,NOTIFIED BY SCHLUMBERGER THAT CRANE TRUCK RAN I OFF ROAD. -SUPERINTENDANT NOTIFIED,DRILL SITE OPERATOR NOTIFIED,BP HSE NOTIFIED. SCHLUMBERGER OPERATOR NOTIFIED MILNE PT SECURITY AND SCHLUMBER HSE. -MOBILIZE X-O'S NEEDED,RIG MAINTAINANCE,R/U SCAFFOLDING 00:00 - 01:30 1.50 FISH P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -RIH,OVERSHOT WITH 3 1/2"GRAPPLE TO TOP OF 3 1/2"TUBING STUB AT 560' -PUWT=53K,SOWT=56K -ENGAGE GRAPPLE,ATTEMPT BLIND BACK OFF,SEE 4K TORQUE AT BREAK THEN 8 L/H TURNS -POOH,BUMPER SUB BACKED OUT AT TOP OF OVERSHOT,3/12"IF CONNECTION 01:30 - 03:00 1.50 FISH P DECOMP RIH AND SCREW BACK INTO OVERSHOT, RELEASE FROM GRAPPLE -POOH,C/O GRAPPLE IN OVERSHOT CHECK TORQUE ON ALL BHA CONNECTIONS EVERY TRIP IN,APPLY MAX TORQUE PER THREAD 03:00 - 06:00 3.00 FISH P DECOMP RIH,OVERSHOT WITH 3 1/2"GRAPPLE TO TOP OF 3 1/2"TUBING STUB AT 560' -ENGAGE GRAPPLE,ATTEMPT BLIND BACK OFF,SEE 5K BREAK THEN 14 L/H TURNS -CONNECTION NOT FREE,SCREW BACK IN 14 TURNS -RELEASE FROM TUBING STUB,POOH, FOUND 2 BODY CONNECTIONS ON JARS LOOSE -DISCUSS OPTIONS WITH TOWN ENGINEER 06:00 - 11:00 5.00 FISH P DECOMP PJSM.CLEAN&CLEAR RIG FLOOR. -LOAD AND STRAP 3 1/2"BTC WORK STRING FOR UPCOMING OPERATION. -DECISION MADE TO MAKE JET CUT ON 1ST JT ABOVE SSSV. -PREP FLOOR TO PICK UP 3 1/2"TUBING. 11:00 - 12:00 1.00 FISH P DECOMP PJSM.MAKE UP BAKER FISHING OVERSHOT W/PACK OFF. -MAKE UP TOP SUB,ALL IDS ON BHA=3". -RIH W/OVERSHOT BHA ON 3 1/2"9.2 PPF BTC TUBING,2300 FT/LBS MAKE UP TORQUE. -LOSSES TO WELL LAST(12)HRS=0 BBLS. 12:00 - 13:00 1.00 FISH P DECOMP PJSM.CONTINUE TO RIH W/OVERSHOT ASSEMBLY AND 3 1/2"BTC TUBING. -UP WT=53K,DOWN WT=57K,LATCH UP FISH @ 560'. -OVER PULL TO 75KAND SET ROTARY SLIPS. -ALL WEIGHTS INCLUDE TOP DRIVE WT OF 40K. Printed 4/14/2014 11 07 08A • North America-ALASKA-BP Page 8 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/me:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 13:00 - 16:30 3.50 FISH P DECOMP PJSM.RIG UP HEAD PINTO ATTEMPT TO CIRCULATE DOWN TUBING. -PRESSURE UP ON TUBING WITH NO RETURNS,2500 PSI. -30 STROKES OR 2.9 BBLS TO PRESSURE UP TO 2500 PSI. -PACKED OFF(4)SSSV @ 861'.BLEED ALL •PRESSURE. 21:30 - 00:00 2.50 FISH P DECOMP PJSM,MOBILIZE SCHLUMBERGER TOOLS TO RIG FLOOR -SPOT E-LINE TRUCK,MOB LUBRICATOR AND EXTENSIONS TO PIPE SHED 3/30/2014 00:00 - 04:30 4.50 FISH P DECOMP PJSM,MOBILIZE SCHLUMBERGER TOOLS TO RIG FLOOR R/U E-LINE FULL PRESSURE CONTROL '-M/U TOOLS AND QUICK TEST SUB, PRESSURE TEST LUBRICATOR -250 PSI,2500 PSI,5 MIN,CHART -BREAK LUBRICATOR OFF AT QUICK TEST SUB -TEST JET CUTTER AT SLB UNIT 04:30 - 06:00 1.50 FISH P DECOMP PJSM,M/U AND ARM JET CUTTER -M/U LUBRICATOR AND TEST AT QUICK TEST SUB RIH WITH CUTTER AND LOCATE CUT 06:00 - 07:00 1.00 ,FISH P DECOMP RIH WITH SINS JET CUTTER TO 852'WIRE LINE MEASUREMENT -CLOSE ANNULAR,JET CUT 3 1/2"TUBING -OPEN ANNULAR,POOH WITH WIRELINE JET CUTTER 07:00 - 08:30 1.50 FISH P DECOMP PJSM,PARTIALLY R/D E-LINE EQUIP -HAVE E-LINE STAND BY 08:30 - 09:00 0.50 FISH P DECOMP RIG UP 3 1/2"TUBING EQUIPMENT -ATTEMPT TO PULL 3 1/2"TUBING FROM _ CUT,PULL TO 167K=UNABLE 09:00 - 10:30 1.50 FISH P DECOMP COMPLETE R/D OF E-LINE,RELEASE SLB E-LINE UNIT -RIG UP POWER TONGS 10:30 - 11:30 1.00 FISH P DECOMP RELEASE OVERSHOT GRAPPLE FROM 3 1/2" TUBING STUB AT 560'MD POOH AND UD OVERSHOT BHA 11:30 - 12:00 0.50 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR -MOBILIZE BAKER BHA TO RIG FLOOR 12:00 - 12:30 0.50 FISH P DECOMP DAILY 30 MINUTE INSPECTION/SERVICE OF •RIG 12:30 - 13:00 0.50 FISH P DECOMP PJSM,M/U BAKER BHA -OVERHOT W/3 1/2"BASKET GRAPPLE, BUMPER SUB,OIL JAR,COLLARS 13:00 - 14:00 1.00 FISH P DECOMP RIH TO 500' -PU WT=52K,SOWT=56K -ROWT©20 RPM=56K,2 BPM=100 PSI,3 BPM=100 PSI -ENGAGE 3 1/2"TUBING AT 560' -ATTEMT TO CIRCULATE AT 2 BPM=UNABLE Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 9 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 19:00 5.00 FISH P DECOMP ATTEMPT TO PULL 3 1/2"TUBING FROM CUT AT 852' -JAR UP AT 140K,PULLING TO 175K -3 1/2"TUBING STARTED MOVING UP HOLE AT 175K PERFORM DERRICK INSPECTIONS AS NEEDED -POOH WITH 3 1/2"TUBING 19:00 - 19:30 0.50 FISH P DECOMP LAY DOWN 9 JOINTS OF 3 1/2"TUBING AND STRAP SAME -L/D 292'PLUS 13.25' CUT JOINT,TOP OF FISH=852' 19:30 - 20:30 1.00 FISH P DECOMP MAKE UP ROPE SPEAR BHA -RIH,TAG UP ON CONTROL LINE AT 444'MD -MAKE UP TOP DRIVE AND ROTATE 2 TURNS I TO THE RIGHT 20:30 - 22:00 1.50 FISH P DECOMP POOH -RECOVERED LARGE AMOUNT OF CONTROL LINE(20'OF 8"OD PACKED ON ROPE SPEAR) 22:00 - 23:00 1.00 FISH P DECOMP RIH,TAG UPON CONTROL LINE AT 460' -POOH,RECOVERED MORE CONTROL LINE (12'X 8"OD PACKED ON ROPE SPEAR) 23:00 - 00:00 1.00 FISH P DECOMP RIH,TAG UPON CONTROL LINE AT 255' •-POOH WITH ROPE SPEAR -RECOVERED MORE CONTROL LINE(10'X 8" OD PACKED ON ROPE SPEAR) -ALSO RECOVERED IN-TACKED CONTROL LINE PROCEEDING FROM WELL -24 HOUR FLUID LOSS=0 BBLS 3/31/2014 00:00 - 02:00 2.00 FISH P DECOMP PJSM,REVIEW AND FILL OUT HAZARD RECOGNITION WORK SHEET FOR PULLING CONTROL LINE -PULL REMAINING CONTROL LINE OUT OF HOLE,—300' -JET DEBRIS FROM BOP'S AND FLOW LINE -CLEAR/CLEAN RIG FLOOR 02:00 - 04:00 2.00 FISH P DECOMP M/U BAKER ROPE SPEAR BHA -RIH TO 850'MD,WORK ROPE SPEAR,POOH -NO CONTROL LINE RECOVERED L/D ROPE SPEAR BHA 04:00 - 05:30 1.50 FISH P DECOMP FLUSH BOP FROM BELOW -DRAIN AND FUNCTION RAMS,INSPECT FOR DEBRIS -WASH BOP WITH TOP DRIVE AND STACK WASHER 05:30 - 06:00 0.50 FISH P DECOMP M/U BAKER BHA TO FISH 3 1/2"TUBING STUB AT 852'MD -OVERSHOT WITH DRESS-OFF GUIDE,MILL CONTROL PACK-OFF AND 3 1/2"BASKET GRAPPLE -BUMPER SUB,JARS AND COLLARS - 06:00 - 08:0D 2.00 FISH P j DECOMP RIH W/OVERSHOT/FISHING BHA ON 4"DP. -LOOK FOR TAG @ 852',NO TAG,DROPPED DOWN HOLE WHEN TUBING WAS CUT. -CONTINUE IN HOLE PICKING UP SINGLES TO 1910'. Printed 4/14/2014 11:07:08AM • North America-ALASKA-BP Page 10 of 15 Operation Summary Report Common Well Name:MPC 05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 08:30 0.50 FISH P DECOMP PJSM.ESTABLISH PARAMETERS.UP WT= 70K,DOWN WT=72K. -ROTATING WT=70K,FREE SPIN TORQUE= 2000 FT/LBS. -SLOW PUMP RATES:2 BPM @ 70 PSI,3 BPM @120 PSI. POLISH AND ENGAGE FISH @ 1916'.NEW UP WT=109K,DOWN WT=95K. -ALL WEIGHTS INCLUDE TOP DRIVE,(40K). r - 08:30 - 10:00 1.50 FISH P ! DECOMP PJSM.CIRCULATE(20 BBLS)HI VIS SWEEP AROUND,SURFACE TO SURFACE. 1-CIRCULATE @ 6 BPM/980 PSI.NOTHING j SIGNIFICANT BACK IN SWEEP. -MONITOR WELL FOR(10)MINUTES,WELL 'STABLE.BLOW DOWN TOP DRIVE. 10:00 - 12:00 2.00 FISH P DECOMP PJSM.POOH W/17 STANDS OF DRILL PIPE. -LAY DOWN OVER SHOT BHA W/SSSV. BOTTOM OF FISH @ 6930'. -UP WT=84K,DOWN WT=76K. -LOSSES TO WELL LAST(12)HRS=0 BBLS. -OUTER ANNULUS PRESSURE=0 PSI. 12:00 - 12:30 0.50 FISH P DECOMP PJSM.MAKE UP FLOOR SAFETY VALVE. SERVICE PIPE SKATE. 12:30 - 22:30 10.00 FISH P DECOMP PJSM.POOH&L/D 3 1/2"BUTTRESS TUBING. -BREAK OUT GLMS AND LAY DOWN,(NO PUP JTS IN STRING) 22:30 - 23:00 0.50 FISH P DECOMP CLEAR/CLEAN RIG FLOOR 23:00 - 00:00 1.00 FISH P DECOMP P/U AND SERVICE BREAK BAKER OVERSHOT ASSY FROM PREVIOUS RUN MOBILIZE BAKER TOOLS TO RIG FLOOR -24 HOUR FLUID LOSS=0 BBLS 4/1/2014 00:00 - 00:30 0.50 FISH 1 P DECOMP 1PERFORM SPCC AND EQUIPMENT CHECKS. I-CROWN 0 MATIC CHECK. -SERVICE DRAW WORKS AND TOP DRIVE. 00:30 - 02:30 2.00 CLEAN P DECOMP PJSM.M/U BAKER DRESS-OFF ASSEMBLY BHA. -6"OD X 3 1/2"ID DRESS-OFF SHOE, WASHPIPE EXTENSIONS,INNER DRESS-OFF MILL,WASH-OVER BOOT BASKET,(2)BOOT BASKETS,6"OD STRING MILL,STRING MAGNET,BUMPER SUB,OIL JAR,PUMP-OUT SUB,COLLARS. -SWALLOW TO INNER DRESS-OFF MILL= 14.9',NOSE OF STINGER=13.9'. 02:30 - 10:30 8.00 CLEAN P DECOMP RIH WITH 4"DRILL PIPE. -P/U DRILL PIPE 1X1 FROM PIPE SHED. RIH TO 6750'DPM. Printed 4/14/2014 11:07:08AM • North America-ALASKA-BP ,Page 11 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE(g52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:00 0.50 CLEAN P DECOMP KICK WHILE TRIPPING DRILL. -WELL SECURED&HANDS AT THEIR RESPECTIVE STATIONS. AAR AND ALL HANDS TO DOG HOUSE. -CONDUCT GOOD AND IN DEPTH TABLE TOP REGARDING STRIPPING IN THE HOLE. DISCUSSED GAS BUBBLE MIGRATION, CONSTANT BOTTOM HOLE PRESSURE TECHNIQUES. -INSTALLATION OF IBOP,STEP BY STEP ON HOW TO STRIP IN AND WORKING PRESSURE RANGE. USE OF DRILLERS METHOD DURING STRIPPING OPERATIONS AND BENEFIT OF HAVING INFLUX OUT OF WELL BORE. -GOOD PARTICIPATION AND INTEREST LEVEL WAS GOOD. 11:00 - 12:00 1.00 CLEAN P DECOMP RIH WITH 4"DRILL PIPE. -P/U DRILL PIPE 1X1 FROM PIPE SHED. 12:00 - 12:30 0.50 CLEAN P DECOMP PJSM.SERVICE RIG FLOOR EQUIPMENT. -SERVICE PIPE SKATE. 12:30 - 14:00 1.50 CLEAN P DECOMP PJSM,RIH WITH 4"DRILL PIPE. -P/U DRILL PIPE 1X1 FROM PIPE SHED. TAG TUBING STUB AT 8819'. -MAKE UP TO TOP DRIVE. 14:00 - 19:00 5.00 CLEAN P DECOMP ESTABLISH PARAMETERS.PUW=140K,SOW =125K,ROT=125K. -ACQUIRE SLOW PUMP RATES AT 2 BPM= 170 PSI,3 BPM=280 PSI. -ROTATE AT 30 RPM=5000 FT-LBS TORQUE FREE SPIN. -ROTATE OVER AND INTO TUBING STUB AND MILL OFF TO 8822'. -PUMP HI VIS SWEEP AROUND AT 6 BPM= 750 PSI. -ROTATE AND RECIPROCATE STRING MILL ACROSS PACKER SETTING DEPTH,(8728') WHILE CIRCULATING. -PICK UP AND SWALLOW STUB WITHOUT ROTATING OR PUMPING,OK. -PUMP 2ND HI VIS SWEEP AROUND AT 6 BPM =750 PSI. -MONITOR WELL FOR 10 MINUTES.STATIC. 19:00 - 20:30 1.50 CLEAN P DECOMP PJSM.SLIP AND CUT DRILL LINE. -CUT 60'OF 1.25"DRILL LINE. -PERFORM WORK ORDERS. 20:30 - 00:00 3.50 CLEAN P DECOMP POH WITH 4"DRILL PIPE. -LAY DOWN DRILL PIPE 1X1 TO PIPE SHED. -POH FROM 8813'MD TO 5970'MD. 24 HOUR LOSSES TO WELL=0 BELS 12.4 PPG BRINE. CUMULATIVE LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. LOSS RATE=0 BPH. 4/2/2014 00:00 - 00:30 0.50 CLEAN P DECOMP PERFORM SPCC AND EQUIPMENT CHECKS. -CROWN 0 MATIC CHECK. -SERVICE DRAW WORKS AND TOP DRIVE. 00:30 - 06.30 6.00 CLEAN P DECOMP POH WITH 4"DRILL PIPE. -LAY DOWN DRILL PIPE 1X1 TO PIPE SHED. -POH FROM 5970'MD TO SURFACE. Printed 4/14/2014 11:07:08AM • North America-ALASKA-BP %' Page 12 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE(4)52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 08:30 2.00 CLEAN P DECOMP PJSM.UD BAKER DRESS-OFF ASSEMBLY BHA. -CLEAN OUT BHA. -JUNK SUBS EMPTY. GOOD INDICATION OF BEING IN TUBING STUB AND MILL FACE INDICATED UNIFORM OD ON STUB. 08.30 - 09:30 1.00 CLEAN P DECOMP PJSM.CLEAR AND CLEAN RIG FLOOR. -PULL WEAR BUSHING. -SET TEST PLUG. 09:30 - 11:00 1.50 BOPSUR P DECOMP PJSM.FLUSH MUD CROSS AND CHOKE MANIFOLD. -GREASE MUD CROSS. RIG UP PRESSURE TEST EQUIPMENT. -FUNCTION RAMS AND BODY TEST BOPE, 11:00 - 16:00 5.00 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS AND DOYON PROCEDURES. -TEST ANNULAR WITH 3-1/2"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES. TEST UPPER 2-7/8"X 5"VARIABLE RAMS WITH 3-1/2"TEST JOINT TO 250 PSI,4000 PSI HIGH FOR 5 CHARTED MINUTES. -TEST LOWER 2-7/8"X 5"VARIABLE RAMS WITH 3-1/2"TEST JOINT TO 250 PSI,4000 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,4000 PSI HIGH FOR 5 CHARTED MINUTES. -TEST WITH FRESH WATER. -FUNCTION TEST GAS ALARMS AND SERRIA SYSTEM. -PERFORM ACCUMULATOR DRAW DOWN TEST. -NO FAILURES. -RIG DOWN TEST EQUIPMENT AND PULL TEST PLUG. JEFF TURKINGTON OF AOGCC WAIVED STATE'S RIGHT OF WITNESS FOR BOPE TEST. 16.00 - 20:30 4.50 RUNCOM P RUNCMP PJSM.R/U TO RUN 3-1/2"TC-II COMPLETION. -RIG UP FLOOR SAFETY VALVE. CLEAN RIG FLOOR OF SODIUM BROMIDE RESIDUE. RIG UP TORQUE TURN EQUIPMENT. FINISH STRAPPING AND DRIFTING 3-1/2" TC-II TUBING IN PIPE SHED. Printed 4/14/2014 11 0708A • North America-ALASKA-BP Page 13 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM 'Rig Release:4/4/2014 Rig Contractor DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.2#L-80 TC-II COMPLETION. -P/U AND M/U HES TNT PACKER WITH UNIQUE OVERSHOT. BAKER-LOC ALL CONNECTIONS BELOW PACKER. -PICK UP TUBING 1X1 FROM PIPE SHED. TORQUE ALL CONNECTIONS TO 2,300 FT-LBS. -USE JET LUBE SEAL GUARD THREAD COMPOUND. RIH FROM SURFACE TO 1838'MD. 24 HOUR LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. CUMULATIVE LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. LOSS RATE=0 BPH. 4/3/2014 00:00 - 14:00 14.00 RUNCOM P RUNCMP PERFORM SPCC AND EQUIPMENT CHECKS. -CROWN 0 MATIC CHECK. PJSM.RIH WITH 3-1/2"9.2#L-80 TC-II COMPLETION. PICK UP TUBING 1X1 FROM PIPE SHED. -TORQUE ALL CONNECTIONS TO 2,300 FT-LBS. -USE JET LUBE SEAL GUARD THREAD COMPOUND. -MAKE UP FINAL JT 267 AND ACQUIRE UP AND DOWN WEIGHTS. -PUW=93K,SOW=83K.INCLUDES 40K TOP DRIVE. 14:00 - 16:00 2.00 RUNCOM P RUNCMP PJSM.LAND TUBING HANGER. -OBSERVE TAG AT 16'IN ON JT 267. -1ST SET OF SHEAR SCREWS SHEAR AT 14K. -CONTINUE TO SLACK OFF AND 24'IN ON JT 267 OBSERVE 2ND SHEAR AT 10K. -OBSERVE NO GO AT 26'IN,(15'SWALLOW= TUBING STUB TOP AT 8826'.) -PULL JTS 267,266 AND 265.MAKE UP 14.80' PUP AND 9.80'PUP FOR SPACE OUT. -MAKE UP TUBING HANGER AND LANDING JT. -DRAIN STACK AND OPEN IA VALVE. LAND HANGER AND RILDS. 16:00 - 17:00 1.00 WHSUR P RUNCMP PJSM.FMC DRY ROD IN TWC. -PRESSURE TEST FROM BELOW TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES. -PRESSURE TEST FROM ABOVE TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES. GOOD TEST. 17:00 - 19:00 2.00 BOPSUR P RUNCMP RIG DOWN AND FLUSH LINES. -FLUSH DOWN MUD PUMP POP OFF,TOP DRIVE HELLY HOSE AND BOPE. -B/D TOP DRIVE,KILL LINE,HOLE FILL AND DRAIN BOPE. 19:00 - 23:00 4.00 BOPSUR P RUNCMP PJSM.INSPECT BOPE RAMS. -OPEN RAM DOORS AND INSPECT RAMS. -N/D BOPE AND SET BACK ON STUMP. CHANGE OUT TOP DRIVE KELLY HOSE. Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 14 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:00AM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 BOPSUR P RUNCMP PJSM.N/D BOPE. -N/D BOPE,TURNBUCKLES,RISER,MOUSE HOLE,KOOMEY LINES,REMOVE CHOKE AND KILL LINES. -REMOVE OLD ADAPTER FLANGE FROM TREE. -INSTALL NEW ADAPTER FLANGE ON TREE. 24 HOUR LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. CUMULATIVE LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. LOSS RATE=0 BPH. OA=0 PSI. 4/4/2014 00:00 - 03:30 3.50 WHSUR P RUNCMP PERFORM SPCC AND EQUIPMENT CHECKS. -CROWN-O-MATIC CHECK. PJSM.N/U TREE AND ADAPTER FLANGE. -FMC PRESSURE TEST ADAPTER FLANGE TO 5000 PSI FOR 30 CHARTED MINUTES.GOOD TEST. -R/U KILL MANIFOLD. -PRESSURE TEST SURFACE LINES TO 250 PSI LOW,3500 PSI HIGH. 03:30 - 05:00 1.50 WHSUR P RUNCMP PJSM.PULL TWC. -R/U WELL SUPPORT LUBRICATOR. -PRESSURE TEST TREE AND LUBRICATOR TO 250 PSI LOW,5000 PSI HIGH FOR 5 CHARTED MINUTES. -PULL TWC. -L/D LUBRICATOR. REVIEW PRESSURE CROSS CHECK WITH CREW DURING PJSM. 05:00 - 11:00 6.00 WHSUR P RUNCMP PJSM.REVERSE CIRCULATE COMPLETION FLUID. -PUMP 80 BBLS SEAWATER DOWN IA. TAKING RETURNS THROUGH THE TREE. -PUMP 235 BBLS SEAWATER WITH CORROSION INHIBITOR DOWN IA. -ICP=3 BPM/1200 PSI.PRESSURE INCREASED AS SEAWATER DISPLACE 12.4 PPG BRINE. -FCP=3 BPM/1400 PSI. -PRESSURE TEST LRS LINES TO 250 PSI LOW,4000 PSI HIGH,OK. -PUMP 80 BBLS DIESEL FREEZE PROTECT DOWN IA AT 3 BPM. -LINE UP AND U TUBE DIESEL FROM INNER ANNULUS TO TUBING SIDE OF TREE,(1) HOUR. Printed 4/14/2014 11:07:08AM North America-ALASKA-BP Page 15 of 15 Operation Summary Report Common Well Name:MPC-05 AFE No Event Type:WORKOVER(WO) Start Date:3/25/2014 End Date:4/4/2014 X4-00YR3-E:(2,270,000.00) Project:Milne Point Site:M Pt C Pad Rig Name/No.:DOYON 16 Spud Date/Time:12/8/1984 12:00:OOAM Rig Release:4/4/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292124400 Active datum:Original KBE @52.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 13:30 2.50 RUNCOM P RUNCMP PJSM.CHECK WELLHEAD FOR PRESSURE AND BLEED. -OPEN MASTER AND SWAB VAVLES,(NO PRESSURE),MONITOR FOR(10)MIN,OK. -DROP ROD AND BALL ASSEMBLY W/ WHEELED ROLLERS. -LINE UP TO PUMP W/LITTLE RED DOWN TUBING. -PRESSURE UP TUBING TO 250 PSI/5 MIN AND 3500 PSI/30 MINUTES,GOOD TEST. OBSERVE PACKER BEGIN TO SET AT 2000 PSI DURING PRESSURE UP. -BLEED TUBING TO 1500 PSI,PRESSURE ANNULUS TO 250 PSI FOR 5 MIN. -CONTINUE TO PRESSURE UP ANNULUS TO 3500 PSI FOR 30 CHARTED MINUTES. -CALL ACTING WTL JAMES WILLINGHAM AND RECIEVE PERMISSION TO MOVE FORWARD. -BLEED TUBING AND OBSERVE DCK VALVE SHEAR,PUMP(1)BBL DIESEL EACH WAY TO VERIFY. 13:30 - 16:30 3.00 RUNCOM P RUNCMP PJSM.INSTALL BPV. -R/U WELL SUPPORT LUBRICATOR. -PRESSURE TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES.GOOD TEST. -INSTALL BPV. L/D LUBRICATOR. 16:30 - 17:00 0.50 RUNCOM P RUNCMP PJSM.PRESSURE TEST BPV. -LRS PRESSURE TEST BPV FROM BELOW TO 1000 PSI FOR 5 CHARTED MINUTES.GOOD TEST. R/D LRS. BLOW DOWN LINES IN CELLAR. 1-R/D SQUEEZE MANIFOLD. 17:00 - 18:00 1.00 RUNCOM P RUNCMP SECURE TREE AND CELLAR. 24 HOUR LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. CUMULATIVE LOSSES TO WELL=0 BBLS 12.4 PPG BRINE. OA=0 PSI. IA=0 PSI. TBG=0 PSI. RELEASE DOYON 16 FROM MPC-05A FOR MOVE TO MPE-19 AT 18:00 HRS ON 04/04/2014. TOTAL TIME,RIG ACCEPT TO RIG RELEASE= 10.58 DAYS. Printed 4/14/2014 11:07:O8AM MPC-05A, Well History (Post-Rig Workover) Date Summary 04/13/14 T/I/O = 1300/1300/0 Conducted PJSM. Verified barriers(SV, SSV). Installed lubricator and PT'd to 300 low and 3500 high. Pulled BPV and tagged at 109"with no extensions. 04/14/14 RAN 3.5" OK-1,W/1 1/4"JDC (brass), S/D @ 5473' SLM (ST#4) PULLED DGLV. RAN 3.5"OK-6,W/ 1 1/4"JDC (brass), S/D @ 4050'SLM, (ST#6) PULLED DGLV. RAN 3.5" OK-6, W/1 1/4"JDC (brass ), S/D @ 2406' SLM (ST#7) PULLED DCK. RAN 3.5" OK-1, W/JK, BK, 1" DOME VALVE (#7, 12/64" tro 1202 psi) S/D @ 2406' SLM, SET VALVE. RAN 3.5"OK-1,W/JK, BK, 1" DOME VALVE(#6, 12/64" tro 1181 psi) S/D @ 4050'SLM, SET VALVE. RAN 3.5"OK-1,W/JK, BK, 1"S/O VALVE (#4, 16/64") IN PROGRESS. 04/15/14 SET 1"S/O (16/64 ports), STA#4 @ 5460' MD. PULL RHC PLUG BODY FROM 8756'MD. MAKE SEVERAL BAILER RUNS 10'x 2.25" PUMP BAILER TO 10496' SLM, RECOVER BANDING METAL AND 2 CUPS SLUGGETS. RAN 2.5"CENT, 3'x 1 7/8" STEM, 2.80" CENT&2.25" LIB S/D IN TUBE STUB @ 8819' MD (tap thru), S/D @ 10496' SLM, HANG UP @ 10471'SLM. 04/16/14 SEVERAL TRIPS W/2.24"3 PRONG GRAB @ 10501' SLM RECOVERING BANDING MATERIAL. MADE 2 RUNS W/2.25" PUMP BAILER TO 10501'SLM, RECOVERED 4 CUPS SLUGGITS. RAN 2.55" CENT, 3' 1 7/8" STM, 2.58"CENT,XO, 2.25" LIB, S/D @ 10501'SLM. RAN 5'2.5" PUMP BAILER (w/ finger bailer bottom) S/D @ 10501' SLM. 04/17/14 RAN 5'2.5" PUMP BAILER (finger cage), S/D @ 10501' SLM, (recover cement/brass/metal banding). HOLD WELL CONTROL DRILL W/WSL. BAILED SLUGGITS W/ 10'2.25" PUMP BAILER @ 10506' SLM, LITTLE OVER 1 GAL RETURNS. RAN 2.55" CENT, 3'x 1 7/8"STEM, 2.64" CENT&2.25" LIB, S/D @ 10508'SLM. 04/18/14 RAN 10'x 2.50" P.BAILER (mule/ball), REC. 2 CUPS SLUGGITS. RAN 10'X 2.25" P. BAILER mule/ball) REC. 1/2 GAL. SLUGGITS AND BRASS CHUNKS. RAN 2.64"CENT&2 1/2"JUS(steel), RECOVERED PRONG FROM 10555' MD. RAN 10'x 2.50" P.BAILER (mule/ball), NO RETURNS. RAN 3"JUS(steel), COULD NOT LATCH PLUG BODY. RAN 2" HYD BAILER W/FINGER BASKET, REC.2 PIECES METAL BAND. RAN 3"JUS(steel) HUNG UP WHILE POOH @ 6849' SLM, JAR DOWN TO 7040' SLM, COME FREE 3" DOG SPRING LIH. RAN, KJ, KJ, 3.5" BLB, KJ, POCKET POKER. 04/19/14 RAN 3.5" BLB& 1.5" POCKET POKER DOWN TO CA-2 PLUG @ 10510'SLM, NO RECOVERY. RAN 2.24"3-PRONG WIRE GRAB TO CA-2 PLUG @ 10510' SLM, NO RECOVERY. R/D EQUIP FOR SCHEDULED MAINT, CONT ON A LATER DAY. FISH IN HOLE: 3"JUS DOG SPRING-APPROX 2.55"L x 2.65" OD x 2.39" ID. CA-2 BLANKING PLUG BODY STILL IN HOLE @ 10555' MD. 04/22/14 RAN 2.55"CENT,3'X 1 7/8"STEM,2.58"CENT&2.25" LIB.S/D @ 10510' SLM.RECOVERED F.N IMPRESSION. 04/23/14 RAN 2.55" CENT,2'X 1 7/8"STEM,3.5" BLB.S/D @ 7048' SLM.UNABLE TO GET ANY DEEPER.APPEAR TO BE SAME DEPTH WHERE SPRING WAS LOST. RAN 2.55" CENT, 3'x 1 7/8" W.B. 2.57" CENT, 2.80" L.I.B @ 8677'SLM.IMPRESSION ON OUTER EDGE OF SPRING. RAN 3 1/2" GR(steel) 3 1/2" BAIT SUB, 3 1/2" BRUSH, 2.62"-2 PRONG WIRE GRAB, FISHED 3"JUS DOG SPRING FROM 6874' SLM. MADE TWO RUNS W/HYDROSTATIC BAILER W/DIFFERENT BAILER SIZES.S/D IN MUTIPLE SPOTS (see log). MADE ONE ATTEMPT TO PULL CA-PLUG BODY FROM 10555' MD.SHEARED TOOL. Page 1 of 2 MPC-05A, Well History (Post-Rig Workover) Date Summary 04/24/14 RAN 3" RB, LATCHED BLUG BODY, @ 10508' SLM/10555' MD, SHEARED OFF. RAN 3 1/2" GS, 3 1/2" BAIT SUB, 3"JDC UN ABLE TO GET PAST TUBING STUB @ 8803'SLM/8846' MD. RAN DOGLESS 3"JDC S/D ON PLUG BODY @ 10508'SLM/10555' MD, UNABLE TO SHEAR PIN. MADE THREE ATTEMPTS TO PLUG PLUG BODY @ 10555' MD.JU KEPT SHEARING OFF.LOST DOG SPRING ON THIRD RUN. RAN 3.5" BLB&2.62"2-PRONG WIRE GRAB.S/D @ 7850' SLM.RECOVERED DOG SPRING. RAN 3" SB (dogless) DOWN TO 10555' MD. PIN SHEARED. 04/25/14 PULLED 2.75" CA-2 PLUG BODY FROM 10555' MD. RAN 2.55"CENT,3'X 1 7/8"STEM,2.55"CENT& 1.5" SAMPLE BAILER.TAGGED BOTTOM © 10892'SLM/10939' MD.BAILER EMPTY. RAN IN W/3.5" X-LOCK W/FLOW THRU SUB,SOFT SET&SINGLE SPARTEK GAUGE.S/D @ 570'SLM,HAD TO JAR TOOLS FREE. RAN 3 1/2" BRUSH, 2.75"GAUGE RING.S/D @ 519' SLM,WORKED TO 531' SLM. RAN 2.70" MAGNET S/D @ 468'SLM,NOTHING RECOVERED.ICE ON MAGNET. PUMPED 5bbls OF 60/40 METH DOWN TBG. LRS ASSIST W/BRUSH AND FLUSH DOWN TO 8808'SLM/8846'MD, PUMPED 12bbls OF DIESEL. SET 2.813"X-LOCK W/FLOW THRU SUB, SOFT SET&SINGLE SPARTEK GAUGE @ 8756' MD. RIH W/3.5"CHECK SET. Page 2 of 2 Tree: 3-1/8"-5M FMC MPU C-05a Orig. C :v. =52' (AUDI 3) Wellhead: 11" x 7"5N .0 Orig. G. ,ay. =17'(AUDI 3) NSCT,w/3.5"FMC tubing hanger CIW 3.5" H BPV profile. 13-3/8",48#, H-40 115' , KOP @ 475' I ` 3.5" X-Nipple (2.813"id) 2187' Max. hole angle =63 deg @ 8600' Daryi 0 Hole angle thru'perfs=46 deg 1 A g i 9 5/8",47#ppf, L-80 1 6019' ftrc.. 3.5"x 1"KBMM W/BK latches ST MD TVD DEV TVP VLV Latch Port Dab +t W 7 2422 2262 40 KBMM Dome BK 12/64 4/22/14 1 1 3-1/+,a y.24, L- i bktttiesstilb+irg 6 4065 3247 53 KBMM Dome BK 12/64 4/22/14 J -80 Sill,FP 5 4858 3743 51 KBMM DMY BK 4/05/14 (dfill ID_2.8g2',cap. .0087 WO th �y ERIC. 5493 4155 49 KBMM B/0 BK 16/64 4/22/14 7m 26 ppl,L.-80, ERIC.prod.casinging 3 6188 4611 49 KBMM DMY BK 4/05/14 ((inn ID 6.151",cap. 0.'0383 be F4^r) I 2 7011 5104 57 KBMM DMY BK 4/05/14 .. 1 8529 5876 63 KBMM DMY BK 4/05/14 E Min I D =2.75" 1• 10,555` MD I . I 3117 Camco D Nipple 1 1 ''VI 3.5"X-Nipple (2.813"id) > 8,690' .i,-*-::-.-r- 7"x 3-1/2"HES TNT PACKER 8,721' [ _*1 3.5"X-Nipple(2.813"id) 8,756' i 7"x 3-1/2"UNIQUE OVERSHOT . I -8,819' f 3.5 Tubing Stub- 8,846' r Cement in IA 9704"-10517 Stimulation Summary r _ , 7— Empty packet 9/25135 frac-20009 lbs away . Hole in Tbg (7/22108) ELBA .''-..,_-_. (screened out). ' '' Hole in Tbg9922`(6/29/11) 1/31185 frac-polyetmulsion frac ;; attempted, no prappant pumped. BOT PBR, seal assy 105{]1 Perforation Summary 7" BOT HB packer 2.89" I D110517' Ref'tog.OIL Log 1/4/855 sz SPF laterva! ,;TVD) 3.5"Cam D nipple 10555' 4. 10784'.10804' 7064% 0(8' (2.75'6 I D) 5 12 10874'-10882' 7125'-7131' WLEG 10588' 5 12 10894`-10902' 7139'-7145' -4 Fish: 9/24/97- lost .8125 grapple in hole attempting to fish GLV at / .'` 3283'. / c.�. / -- Lost D&D hole finder in rat hole. 7"float collar(PBTD) 11012' Ilk 5" x 20' casing gun w/CCL top of A 7"float shoe 11091' fish est. 10950'. DATE REV.BY COMMENTS MILNE POINT UNIT 1/18/85 Drilled and completed WELL C-05a 7/27/03 M.Linder Put in Canvas drawing format API NO: 50-029-21244-01 5/10/12 B. Bixby Pkr. Sqz. Failed 4/05/14 B.Kruskie Doyon 16 RWO BP EXPLORATION (AK) v oFr„ ill • e „,,,,,,,-. -. THE STATE Alaska Oil and Gas h �� of Conservation Commission GOV ERNOR SEAN PARNELL *h. t 333 West Seventh Avenue O Q. Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 Sharby Sullivan " t 3 Production Engineer L - --'. BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Kuparuk River Oil Pool, MPC -05A SCANNED JAN 16 ZO Sundry Number: 312 -485 Dear Mr. Sullivan: i Enclosed is the approved Application for Sundry Approval relating to the above_referenGed. well. • i Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerel, i I d dir ! `, . o • an ,.7.r* i : DATED this 3 day of January, 2013. Encl. • • ED STATE OF ALASKA "' ALASKA OIL AND GAS CONSERVATION COMMISSION � DEC 2 012 ' APPLICATION FOR SUNDRY APPROVALS ist7.it 1. Type of Request: Abandon ❑ Plug for Redrill❑ 20 Perfo ate New Pool ❑ Repair Well 0 . 14ad (�rogram Suspend ❑ Plug Perforations Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Otheres-l- Pi, 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number. BP Exploration (Alaska), Inc. Development 0 . Exploratory ❑ 184 -243-0 3. Address: Stratigraphic ❑ Service ❑ 6. API Number. P.O. Box 196612, Anchorage, AK 99519 - 6612 50 -029- 21244 -01 -00 . 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? MPC -05A • Will planned perforations require a spacing exception? Yes ❑ No ❑ 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0047434 . MILNE POINT, KUPARUK RIVER OIL. 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11200• 7350 10149 6668 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 13 -3/8" 48# H -40 35 - 115 35 - 115 Surface 5985 9 -5/8" 47# L -80 34 - 6019 34 - 4500.02 6870 4760 Intermediate None None None None None None Production 11058 7" 26# L -80 33 - 11091 33 - 7274.83 7240 5410 Liner None None None None None None Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Attachment See Attachment 3 -1/2" 9.2# L -80 L -80 32 - 10588 Packers and SSSV Type: 3 -1/2" Baker HB Packer Packers and SSSV MD (ft) and TVD (ft): 10517, 6886.77 . No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program 0 • BOP Sketch ❑ Exploratory ❑ Development el • Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: Oil 151. Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sharby Sullivan Email Sharby.Sullivan@BP.Com Printed Name Sharby Sullivan Title y rroeLLCA-i . G nrJ,'a Signature Phone Date Prepared by Garry Catron 564 -4424 564 -5520 la— /4 - 2,0/ 2 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 511 2- - q g5 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: t REIMS JAN 0 3 21 i `x'' 1 Spacing Exception Required? Yes ❑ No - Subsequent Form Required: / _ c10Li / APPROVED BY Approved by: OMMIS ER THE COMMISSION Date: / 03 U 3vi e G 2 I i NA Form 1 � � ro - . application is valid for 12 months from the d of approval. sate ��� � �zz 7•iz , i \ Perforation Attachment ADL0047434 Well Date Perf Code MD Top MD Base TVD Top TVD Base MPC -05A 4/19/12 BPS 10784 10804 7064 7078 MPC -05A 4/19/12 BPS 10874 10882 7125 7131 MPC -05A 4/19/12 BPS 10894 10902 7139 7145 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED • BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BRIDGE BPS PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF I , • bp e • ,,, 0 To: Mark O'Malley / Rob Handy Date: December 4, 2012 MPU Field Operations Team Leader From: Todd Sidoti - Wells AFE: Sharby Sullivan — Pad Engineer IOR: 100 Subject: MPC -05A Packer Squeeze Est. Cost: 1 F CMIT TxIA, circ out well 2 C Packer squeeze. Mill out composite 3 FP WOC, MIT -IA Current Status: SI with CBP and cement cap at 10,114' ELMD Last Test: 12/21/10 Gross fluid: 194 bpd, Oil rate: 110 bopd Max Deviation: 61° @ 8,600' MD Perf Deviation 48° @ 10,700' MD Minimum ID: 2.75" @ 10,555' MD 3 -1/2" Camco D Nipple Last Downhole Op: 10/01/12 EL ran SCMT to 10,114' ELMD f Last Tag: 10/01/12 EL Tagged @ 10,114' ELMD Latest H2S Value: 05/01/01 2.70 PPM SBHP /SBHT: 06/20/09 3886 psi & 174F at 7,000' TVDSS after 497 days SI Reference Log: PDS Gas Lift Survey dated 9- APR -2000 Contacts: Todd Sidoti Sharby Sullivan Jessie Chmielowski 632 -4113 (c) 208 - 755- 1909(c) 830 -5000 (c) 564 -5113 (w) 565 -5520 (w) 564 -5015 (w) Volumes: OD ID bbl /ft 3.5" 9.2# L -80 3.5" 2.992" 0.0087 7" 26# L -80 7" 6.276" 0.0383 3.5" x 7" Annulus 0.0264 cc: w /a: Well File Relevant Well Background The goal of this program is to repair T x IA communication and restore well integrity via a cement packer repair. The IOR of MPC -05 is 100. A CT packer squeeze was attempted and failed on 5/10/12. It is suspected that since there were multiple holes in the tubing the cement squeezed into the annulus swapped out with lighter fluid below it. We had not experienced the swapping out of fluids in the annulus on previous packer squeezes, but all indications point to swapping cement as the reason for the failed job. A D &D hole finder ran on 8/4/2012 confirmed tubing integrity above —9820'. A cement bond log ran on 10/1/2012 located TOC in that vicinity —9800' in the 3.5" x 7" annulus. 1 • • • Tubing Leak Repair Objectives The objective is to perform a cement packer squeeze to restore tubing integrity. The tubing has a known hole(s) at a depth of -9820' MD. A circ out will prove that we have good communication through this hole. We will lay in and squeeze cement into the annulus through the hole at -9820'. Upon passing a "mini" MIT the cement and plug will be milled out during the same rigup. Desired TOC in annulus: 9500' ✓ Cementing Specifications: • 15.8ppg class G Unislurry • 6 hours thickening time o 2 hours mixing and shearing at surface o 1 hour to pump and squeeze o 1 hour to contaminate o 2 hour safety factor • 8 hours to reach 500 PSI compressive strength • 2000 PSI ultimate compressive strength • BHCT: 155 degF • SBHT: 170 degF • Perform a UCA and thickening time test on the field blend prior to rigup 1. CMIT TxIA to 2500 PSI - if this step fails stop the job and contact town 2. Circulate well down the tubing taking returns to the IA. Pump at max rate not to exceed 2500 psi: a. 10 bbls meth spear b. 275 bbls diesel (IA volume plus 16 bbls overdisplacement) c. 59 bbls Inhibited 2% KCL d. 26 bbls diesel 3. Do not u -tube the well after circulating is complete. We want to have the tubing overbalanced to the IA. v,� , ® .4 1. RU CT with reverse out skid to allow returns from the CTxT (backside) or the IA. It will also need to allow the cementers to pump down the coil while taking returns up the IA or backside. 2. Bleed any gas off IA and tubing. After bleeding keep the IA shut -in. 3. RIH with ball drop cementing nozzle to composite plug depth. Take displacement returns to the CT X TBG backside. Tag the cement top and pick up until full string weight is observed. Correct depth to 10,114' to get on ELMD. 4. PUH 10' and flag pipe 2 • • 5. Circulate 10 bbis diesel down the CT x TBG backside and up the IA to make sure that there is no gas in the IA and establish 1:1 returns. Shut in IA. 6. Pump cement down the CT taking returns up the CT x TBG backside according to the following schedule: a. 5 bbis freshwater spacer for PT b. 10.6 bbis class G Unislurry c. 1 CT volume ( -33 bbis) of freshwater to get cement to the nozzle 7. When cement reaches the nozzle, CT depth should be at the flag (10' above the current cement top). Allow cement to get 100' above the nozzle and then lay in cement 1:1. Time the nozzle depth such that the nozzle depth and cement top (8900') are equivalent as the last of the cement leaves the nozzle. 8. When last of cement exits nozzle PUH to safety -300 ft above WCTOC. Ensure coil speed is in excess of 100 fpm to avoid stringing cement up hole. With 10 bbis of cement, the worst case top of cement in the 3 -1/2" tubing should be 8900' MD, putting safety at 8600' MD. 9. With CT at safety, open IA and circulate exactly 7.9 bbls of cement into the IA by pumping diesel down the CT x TBG backside and taking returns from the IA. Once 7.9 bbis have been circulated into the IA, shut in IA. The IA will remain SI for the remainder of the job. While it is not critical that a constant IA pressure is maintained, it is important that the well is not surged. Do not let IA pressure bleed down or cement will u -tube. 10. Swap to 3.0 ppb biozan and drop ball. With biozan at the nozzle jet down to flag depth. PUH while continuing to jet biozan and ensure 3.0 ppb biozan is spotted across interval 8850'- 10,114'. This will serve 2 purposes: the 3.0 ppb biozan will help keep the cement in the IA by acting as a viscous barrier. It will also help keep any residual cement in the tubing contaminated. 11. With slick 2% KCL at the nozzle proceed with a standard cement clean out jetting to surface at 80% and washing all jewellery on the way out of hole. 12. FP Tubing. / 7; ' / % / /i '' 1 �/ f „, ,, /,, ; ,, 57 ,- l /r a [ A . ��, r. k" ,2 13. Make up a motor with a flat bottom mill, RIH to +/- 8000' performing weight checks as necessary. 14. Wait until the cement reaches 500 psi compressive strength based on the UCA lab test. Perform a "mini" MIT -IA to a AP of 500 psi (i.e. IA pressure + 500 psi by pumping diesel down the IA. 15. If "mini" MIT -IA passes, mill up cement and the composite plug at 10,150' MD and push to TD. Ensure that while milling the composite 1000 psi of tubing pressure is maintained so plug will not get blown up the hole (bottom hole equivalent mud weight is 10.6 ppg). Do not surge well while milling plug, this could adversely affect the cement in the IA that is still setting up. 16. If "mini" MIT -IA does not pass - do not mill up composite plug. Contact town to discuss results prior to proceeding with milling. a. Note: Do not mill out the composite plug as it will be used during the LDL to determine the MIT -IA failure mechanism. 17. POOH. Ensure that tubing is freeze protected to 2,500'. 18. After 3 days WOC MIT -IA to 2500 PSI. If fails establish LLR 3 • • 0 STATIC BOTTOM -HOLE PRESSURE SURVEY Vim, 4. Rev 08/12,2004(JOMI Well: MPC -05A API #: 50 -029 -21244 Date: 41412012 Prod Engr Sharby Sullivan Office Ph: 564-5520 H2S Level: Cost Est: $15,000 Home Ph: 3.0 ppm 05!0112001 CC orAFE: AMPNRWOS Cell /Pager: 208 - 755 -1909 WBL Entries Type Work Description Comments S SBHPS Well Objectives. Logging Notes, and Special Instructions: Min ID is 2 75" at 3 -1/2 "Cameo D nipple at 10,555' MD The last 3BHF5 was obtained irti12012000 - -, 3,8'86 psi after 497+ days shut -in. Phase perform this static after TTP is pulled as part of SL step #1 of cement squeeze program Datum 7000' SS I Well Data Procedure: Last Tag' 10555' MD Tag data 6129/2011 1. Make 10 min pressure stop in lubricator Last Tag 10513' SLM Tag date 6129/2011 2. Drop below the first pressure -stop requested. Pull -up to specified depth Ma Deviation 63' Depth 8600' MD 3 For each requested stop S1L: Hold guages at depth for time specified Min S I Tirne 14 days I Logging Data 4. SIL. Hold gauges in lubricator for 10 min stop Compare to test guage Zone Kup B +C Requested Stops: MD SS Time First 8,459' 5792' 15 min Second 9,494' 6292' 15 min 5. Leave well shut in if SBHP is less than na Third 10450' 6792' 30 min Summary Dist • Well: MPC -05A API #: 50-029-21244 PE ; Town ............................ Date: Anch Prod Engr Service Co. New Tag: 'MD P D. Center Upper Lower Date Time MD SS Gauge Gauge Zone Temperature Test Gauge Pre -Job Lubricator Pressure 8,459' 5792' 9,494' 6292' • 10450' 6792' Post -Job Lubricator Pressure Type of Pressure Tool SITP (Tubing). psig SICP (9- 518 "): Zone Kup B +C Shut In Date Comments' ' and Time Total Shut In Time (hrs) 4 • • Tree: 3 -1/8" - 5M FMC MPU C -05a Orig. DF Elev. = 52' (AUDI 3) Wellhead: 11" x 7" 5M FMC Orig. GL Elev. =17' (AUDI 3) NSCT, w/ 3.5 "FMC tubing hanger CIW 3.5" H BPV profile. 1 13 -3/8 ", 48#, H-40 ( 115' 3.5` Camco TRSV( 2.813 "id) 11946' 't it Locked out KOP @ 475' Max. hole angle =63 deg @ 1 '�' Camco glm. kbmm. wl bk latch 8600' # and tvd dg Hole angle thru' perfs = 46 deg 9 2180' 2072' 36 * 8 3283' 2800' 51 7 4281' 3380` 51 9 5/8 ", 47# ppf, L 80 1 6019' / , 6 5258' 4000' 50 BUc. 1) 5 6040' 4515' 49 4 6824' 5000' 55 3 7767` 5510` 59 2 8806' 6003' 62 1 9835' 6508' 61 3 =1/2 ", 9.2#, L - 80 buttress tubing *Damaged latch on #8 (daft ID = 2.992 ", cap. = .0081 bpf) gas lift valve. 7" 26 ppf, L -80, Btrc. prod. casing ( drift ID = 6.151 ", cap. = 0.0383 bpf) ik Min ID = 2.75" @ 10,555' MD 3 1/2" Camco D Nipple Stimulation Summary 1111111 9/25/85 frac- 20000 Ibs away (screened out). 1/31/85 frac- polyemulsion frac Hole in Tbg (7/22/08) 9857' attempted, no proppant pumped. Hole in Tbg (6/29/11) 9922' DOT PBR, seal assy 110501'1 Perforation Summary 7" BOT HB packer 2.89" ID1 1 Ref log:OIL Log 1/4/85 sire SPE IT (TVD) , \ 3.5" Camco D nipple 110555' 11 4 10784` - '10804 (2.75" ID) 5 12 10874'- 10882' WLEG 1105881 5 12 10894`- 10902' 2.75" CA -2 Plug Set 08 -04 -11 Fish: 9/24/97- lost .8125 grapple in hole attempting to fish GLV at 3283'. Lost D &D hole finder in rat hole. 7" float collar (PBTD) 1 11012' 1 A 7" float shoe 5 "x 20' casinggunw /CCLtopof 1 11091' fish est. 10950'. DATE REV. BY COMMENTS MILNE POINT UNIT 1/18/85 Drilled and completed WELL C - 05a 7/27/03 M.Linder Put in Canvas drawing format API NO: 50 - 029 - 21244 - 01 BP EXPLORATION (AK) 5 • • F ullbo re Setup h1ia 5 Annular Fluids Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 9800 258.7 Tubular Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 3000 26.1 Inhibited Brine KCI 3000 9800 59.2 GLM: 8806 Diesel Brine Tubing Hole:-9800 Cured Cement TOC: -9800 CBP & Cement Cap: 10114 X Packer: 10517 6 • Lay I n Annular Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 9800 258.7 Tubular Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 3000 26.1 Brine KCI 3000 8900 51.3 Cement Class G 8900 10114 10.6 GLM: 8806 Diesel Cured Cement Tubing Hole: 9800 Brine TOC: -9800 We* 00,1110rit, ; ` I CBP & Cement Cap: 10114 Packer: 10517 • • Squeeze Annular Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 9434 249.1 Cement Class G 9500 9800 7.9 Tubular Fluids Type Fluid Top Bottom Volume Freeze Protect Diesel 0 3000 26.1 Brine KCI 3000 9800 59.2 Cement Class G 9800 10114 2.7 GLM: 8806 Diesel A Cement Brine Tubing Hole: -9800 TOC: 9800 p CBP & Cement Cap: 10114 Packer: 10517 8 DATE: 5- Nov -12 Stephanie Pacillo TRANS#: 6192 Data Delivery Services Technician � Mak - anaK Bender Schiumherger Oilfield Services "t* , ) Natural Resoui:cesTechnician II WIREUNE t- Alask.d Oil �;._ic> 1.:o its( :i :vltlen COt�liili581k. i1 2525 Gambell St, Ste. 400 , 3 Anchorage, 99503 SCANNED FEB 2 5 201 v . ,1v‘:. ;�U > \i; -11, , , . , . ; TR: Office: (907) 273 -1770 • lli`ELL - SERVICE OH ' RESERV GNC MEeN LOG DESCRIPTION ,:DATA ;, - etrit ��OL0R F' ,� C��t 4 .4,� NAM ORDER ,# 01SST DIST DI -DtST _,�` .. IQG GEI:� : PRiNTS.. ; PRINTS 15 -30B BCRC -00208 X � _ MEMORY PPROF 05-SEP-202 1 1 CD S -102 C5XI -00029 X -11111111 MEMORY IPROF ." 11111111111.11/ 1 CD • MPE -23 C600 -00055 X 11111111111111111111 MEMORY IPROF 7-Oct-12 111111111 1 CD MPL -15 C600 -00035 X MEMORY (PROF IrErM11111111111111111111 1 CD %' MPC -05A AMPSURVEEL X 11111111 1- Oct -12 11111111111111111111111 1 CD 01 -02 CBTY -00004 X LEAK DETECTION LOG 5-Oct-12 Illailillinil 1 CD G -08A CBAF -00009 X LEAK DETECTION LOG 27- Sep -12 monam. 1 CD 09 -05A APBNRWOSEL X FLOSCAN IMAGER 16•Oct -12 111111111111111111111 1 CD W -15A BZ2J -00023 X MEMORY GAS LIFT SURVEY 10 -Au! -12 111111111 1 1 CD MPI -18 BCRC -00204 X MEMORY IPROF 30-Au. -12 11111111.111111111 1 CD 1345 CBAF -00008 X Mill LEAK DETECTION LOG 23- Sep -12 Nommoni 1 CD 13-08A BBSK -00139 X -_ LEAK DETECTION LOG 26- Sep -12 11113.111111110 1 CD V -225 BSM4 -00035 X IPROF RST W/ WFL EME1111111.11111111111111111111111 1 CD 11 IIINIIIIIMIIIIMIIMIIIIIIIIIIIIIIIIIIIMIMIIIIIIIIIMINIIIIIIIIIMIIIIIMIIIIIIIIMIIIIIIII ME= MIIIIIIIIIIIIIIIIIIIIMIIMNIIIIIINIIIIIIINIIIIIIIIIIIIIIMIIINIIIINII IIIIIIIIIIIIIIIIIIIIININIIIIIMIIIMIIIIIIINIIIIIIIIIIIIMIMIINIIIIIIIIIIIIIIIIIIIIININI IIIMIIIIIIIMIMIIIIIIINIIIIIINIIIIIIIIIIIIIIIIMIIIIIIIIIIIIIIIIMIIIMIIIIIMIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIINIIIIIIIIIIIIIIIIMIIIIIIIIIIIIIIIIIMIIIIIIIIIMNIIIIIINIIIIIIINIIIIINII X Please return a sign d copy to: Please return a signed copy to: BP PDC LR2 -1 DCS 2525 Gambell St, Suite 400 900 E Benson Blvd Anchorage AK 99503 N S Anchorage AK 99508 0.2s gil • STATE OF ALASKA • 1 ALASKA OIL AND GAS CONSERVATION COMMISSION , REPORT OF SUNDRY WELL OPERATIONS ct. p.,, 1. C •ations Abandon LJ Repair Well LJ Plug Perforations U Perforate U Other U Squeeze Pc a d : Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2.Operator 4. Well Class Before Work: 5. Permit to Drill Number: i t Jame: BP Exploration (Alaska) , Inc. Development ® Exploratory ❑ 184 -243 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, Alaska 99519 -6612 50- 029- 21244 -01 -00 • 7. Property Designation (Lease Number): 8. Well Name and Number: ADLO- 047434 MPC -05A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): Milne Point Field / Kuparuk River Pool 11. Present Well Condition Summary: Total Depth measured 11091 feet Plugs measured NONE feet true vertical 7354 feet Junk measured NONE feet Eff9ctive Depth measured 11012 feet Packer measured 10517 feet true vertical 7220 feet true vertical 6887 feet Ca...?'` Length Size MD TVD Burst Collapse Structural Conductor 80' 13 -3/8" 48# H -40 35' -115' 35' -115' 1740 750 I Surface 5985' 9 -5/8" 47# L -80 34' -6019' 34' -4500' 6870 4760 .1. Production 11058' 7" 26# L -80 33' - 11091' 33' -7275' 7240 5410 Liner I Liner RECEIVED Perforation depth Measured depth SEE ATTACHED feet JUN 0 8 2012 True Vertical depth feet AUG 2 V U i a AOGCC Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.2# L -80 32' - 10588' 32' -6933' Packers and SSSV (type, measured and true vertical depth) 7" BOT HB PKR 10517' 6887' :1 . :1 Stimulation or cement squeeze summary: f } nten, als treated (measured): Tre _ t descriptions including volumes used and final pressure: [3. Representative Daily Average Production or Injection Data Oil-Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure I Subsequent to well operation: bsequent to operation: I '4. Attachments: - 15. Well Class after work: :1;opies of Logs and Surveys Run Exploratory 0 Development © Service ❑ Stratigraphic ❑ Daily Report of Well Operation's x 16. Well Status after work: Oil ' © Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Nita Summerhays Printed Name Nita Su hays Title Petrotechnical Data Technician if gnatur- 91,Wi111111$11, r � f oAr i repoli/��i� — Phone 564 -4035 Date 06/07/2012 Rf3DMS JUN 12 2014 V lifr(re-- Form 10-404 Revised 11/2011 11 1 7j / j Z,,,.. Submit Original Only / i MPC -05A 184-243 PERF ATTACHMENT Sw Name Operation Date . Perf Operation Code _ Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPC -05A 1/18/85 PER 10,784. 10,804. 7,064.24 7,077.75 MPC -05A 1/18/85 PER 10,874. 10,882. 7,125.41 7,130.9 MPC -05A 1/18/85 PER 10,894. 10,902. 7,139.14 7,144.64 MPC -05A 11/2/01 FIL 10,600. 11,012. 6,941.02 7,220.4 MPC -05A 3/8/11 BPS 10,555. 10,902. 6,911.47 7,144.64 MPC -05A 8/3/11 BPP 10,555. 10,902. 6,911.47 7,144.64 MPC -05A 8/4/11 BPS 10,555. 10,902. 6,911.47 7,144.64 MPC -05A 4/14/12 BPP 10,555. 10,902. 6,911.47 7,144.64 MPC -05A 4/19/12 BPS 10,150. 10,784. 6,668.64 7,064.24 AB ABANDONED PER PERF • APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • MPC -05A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY a PTIPI�9 iir ) d rc r. �� ` � ��....'. � , .".� 4/14/2012 ** *WELL S/I ON ARRIVAL * ** DRIFTED W/ 2.805" GAUGE RING, 3 -1/2" BRUSH, 1.92" GAUGE RING. * * *CONT'D ON 4- 15 -12 * ** 4/15/2012T/I/O= 820/780/0 Assist slickline MIT -T to 1400 psi PASS. Lost 32 psi first 15 minsj !and 16 psi second 15 mins. Used .75 bbls diesel to achieve test pressure bled back 3 1.75 bbls. Slickline on location at departure 4/15/20121 * * *CONT'D FROM 4- 14 -12 * ** SET D &D HOLE FINDER @ 9750' MD, LRS MIT -T TO 1400 PSI, PASSED PULLED BK -DGLV FROM STA #1 @ 9795' SLM/ 9835' MD, POCKET LEFT ;OPEN PULLED CA -2 PLUG FROM 10555' MD RAN SBHPS AS PER PROGRAM, RDMO ` ** *WELL S/I ON DEPARTURE * ** 4/18/2012 WELL SI ON ARRIVAL (ELINE COMPOSITE BRIDGE PLUG) !INITIAL TWO 1400/1300/0 INITIAL VALVE POSITION: MASTER, GAUGES TO CASING = OPEN. SSV, !WING, SWAB = CLOSED ' ** *JOB CIONTINUES ON 04/19/12 WSR * ** 4/19/2012 *CONTINUED FROM 04/18/12 WSR ** *(ELINE COMPOSITE BRIDGE PLUG) RIH WITH MH22 /ERS /EQF 43 /EQF 46 /EQF 46 /HALIBURTON SETTING TOOL /PLUG JCENTRE ELEMENT OF PLUG SET AT 10150 ELMD. TOP OF PLUG 10149.35 FT 1, BOTTOM OF PLUG 10151 FT !POOH 1 FINAL T /I /0= 800/800/0, SSV /SWAB CLOSED, IA/OA= OTG, PE AND DSO NOTIFIED ON DEPARTURE _ ** *JOB COMPLETE WELL SI ON DEPARTURE * ** 4/21/2012.T/I/O= 750/750/20 temp =SI CMIT Tx IA 2500 psi PASS Rigged up to IA and j 'pumped 2.5 bbls diesel to pressure up. First 15 mins tubing lost 16 psi and IA lost 9 I psi, second 15 mins tubing lost 0 psi and IA lost 7 psi. On second test attempt. _ .......__ ;Pass per PE. Bled back 2.5 bbls diesel. Final WHPs= 780/750/20 4 /22 /2012 diesel to B pad upright tank 4/24/2012; Rig up, Standby for fluids. 4/25/2012; T /I /O= 740/400/0 Circ Out Well (Pre Cement Squeeze) Circ out well w/ 5 bbls 60/401 ;spear, 312 bbls diesel, 60 bbls inhibited brine, 25 bbls diesel. pumping down Tbg. taking returns up IA into surface tank. At 280 bbls of diesel away pump rate :decreased to 0.3 BPM @ 3000 psi for 6 bbls . Tbg pressure rapidly fell off and IAP a increased to 130 psi_ FWHP= 550/960/0 SV,WV,SSV shut MV,IA,OA Open —! 5/4/2012'T/I/O = 864/1448/0. CMIT TxIA PASSED to 2544psi. Tubing overbalanced with brine. Pressured up w/ 1.1 bbls 60/40 down IA. Tubing /IA lost 32/48psi 1st 15min, 16 /Opsi 2nd 15min, for a total of 48/48psi in 30min. FWHP's = 880/1500/0. Swab, _._.._,_....._....._....._1SSV, Wing, AL = shut. Master, IA, OA = open. • 5/8/2012 1CTU 8, 1.75" coil, Job Scope: Cement Packer Sqz, millout CMT and plug. MIRU CTU 8. Spot equipment. Good Double barrier test. N/U BOPE. M/U !Cementing BDN BHA. PT lubricator with low /high press. RIH with cementing BHA. PJSM. Continue RIH with cementing BHA. «< Job in Progress » >. 5/9/2012 Continued from WSR of 05/08/12, CTU 8, 1.75" coil. Job Scope: Cement Packer' ;Sqz, millout cement and plug. ;Continue RIH with cementing nozzle. Tag plug at 10114' CTD and correct depth to 110150'. Pull up 10' and flag coil at 10140'. PT CMT line with low / high pressure. Good test. Batch mix 15.8 ppq, G cement. Pump 15.3 bbl G CMT and displace with water. Lay in cement inside 3 -1/2" tubing at 0.8 bpm and 92 fpm. TOC at 8390'. Nozzle at 8390' when last of cement out nozzle. Pull to safety at 7800'. SQZ 12.5 bbl CMT to IA taking returns thru choke to gauge tank. 40 bbl gauge had 1 bbl increments. Close choke at 12.5 bbls returns from IA. Close IA valve and red `tag. Drop 5/8" ball and displace with 3# Biozan. Jet tubing from 8200'down to Composite plug at 10150' with 3# Biozan. Lay in Biozan up to 9200'. Chase ;cement and Biozan out at 2.0 bpm while POH. CMT Packer SQZ went well. POH to surface. Freeze protect tubing and coil. Trap 400 WHP to leave 850 IAP. Close ;swab and SSV. Pop off well, BD CMT BHA. I MU Milling BHA: 2.65" mill. OAL = 20.91'. MIT x IA to delta 500 psi failed. !Communication between the IA and tubing is present. Contacted town and decided to mill to the flag @ 10,140', leaving the CBP downhole. Begin milling and had no motor work to tag of CBP at 10133' CTM'. Chase any solids OOH w/ biozan and I KCI. FP wellbore w/ diesel to 2500'. In progess 5/10/2012 j CTU #8 w/ 1.75" CT (CTV =29.3) !Objective: Packer squeeze (tubing repair) failed RD milling tools -no wear on mill. Cut off 20' of CT, chain inspection. RDMO to Z- , 140 — tJob incomplete -WO diagnostics FLUIDS PUMPED BBLS 397.5 DIESEL 88.1 60/40 METH 60 INHIBITED BRINE 80 BIOZAN 750 KCI 61 FRESH WATER 1436.6 TOTAL Tree: 3 -1/8" - 5M FM MPU C -05a Orig. felev. = 52' (AUDI 3) Wellhead: 11" x 7" 5C _ Orig. GL Elev. =17' (AUDI 3) NSCT, w/ 3.5 "FMC tubing hanger CIW 3.5" H BPV profile. 13 -3/8 ", 48 #, H -40 115' R 3.5" Camco TRSV( 2.813 "id) 1 1946' 1 2 Locked out KOP @ 475' Max. hole angle =63 deg @ Camco glm. kbmm. w/ bk latch 8600' # and tvd dg Hole angle thru' perfs = 46 deg 9 2180' 2072' 36 * 8 3283' 2800' 51 ' ' 1 7 4281 ` 3380' 51 9 5/8 ", 47# ppf, L-80 6019' 6 5258' 4000' 50 Btrc. mi 5 6040' 4515' 49 4 6824' 5000' 55 psi 3 7767' 5510' 59 I 2 8806' 6003' 62 1 9835' 6508' 61 3 -1/2 ", 9.2 #, L -80 buttress tubing 1 *Damaged latch on #8 gas lift valve. (drift ID = 2.992 ", cap. = .0087 bpf) 7" 26 ppf, L -80, Btrc. prod. casing M ( drift ID = 6.151", cap. = 0.0383 bpf ) or e r :-.„0 t 5 Min ID= 2.75 " @10,555`MD i z@�' 3 � 3 1/2" Camco D Nipple / Stimulation Summary 4/ 9/25/85 frac- 20000 lbs away / Empt pocket il (screened out). i � , Hole in Tbg (7/22/08) 9857' 1/31/85 frac- polyemulsion frac Hole in Tbg (6/29/11) 9922' attempted, no proppant pumped. rr IHESCBPset @10150`I A i ; / BOT PBR, seal assy 110501'1 Perforation Summary 7" BOT HB packer 2.89" ID110517' Ref log:DIL Log 1 /4/85 I vi/e c � play Size SPF Interval (TVD) rl 3.5" Camco D nipple 110555' 4 10784`- 10804' (2.75" ID) — 5 12 10874`- 10882' WLEG 110588`I 5 12 10894`- 10902' Fish: 9/24/97- lost .8125 grapple in hole attempting to fish GLV at 3283'. / Lost D &D hole finder in rat hole. 7" float collar (PBTD) 1 11012` 1 ik 5" x 20' casing gun w/ CCL top of , 7" float shoe 1 11091' fish est. 10950'. DATE REV. BY COMMENTS MILNE POINT UNIT 1/18/85 Drilled and completed WELL C 7/27/03 M.Linder Put in Canvas drawing format API NO: 50 029 - 21244 - 01 BP EXPLORATION (AK) WELL LO ,a TRANSMITTAL TAL PeoAcrivE DiagmxTic S ERVICES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793 -1225 RE: Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection[Caliper / MTT] The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 -1 900 Benson Blvd. -0q 3 a v 3 Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. U 4, 0— t Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: Fax: (907) 245 -8952 1) Injection Profile 05Sep -10 MPU C-19 BL / EDE 50 -029- 2150400 F 2] Gas Lift Survey 20Sep -10 MPU C -05A BL / E09 1 1 Signed: Date y aka C d l a Gas "", a:m a �a +fir Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE AK 99518 PHONE: (907)2454951 FAx: (907)245.88952 E-MAIL: gdsanchorage0memorylog.com WESSITE : www. C Zmuments and Set&W\Dmne Williams \Desktop \Tran=t_BP.doex 10/08/09 NO. 5410 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CO MPC -05A 11661124 MEMORY PROD PROFILE 01/25/07 1 L4 -03 AYIIM -00032 PRODUCTION PROFILE 09/09109 1 1.5 -05 AP3O -00061 PRODUCTION PROFILE 09/15109 1 03 -24A AZCM -00042 LDL 09/14/09 1 07 - 328 BOCV - 00027 JEWELRY LOG/GR W/PRESS/TEMP 15/09 1 W -214 AYS4 -00095 INJECTION PROFILE 09/12/09 1 04 -26 BSJN -00014 PRODUCTION PROFILE / 09/25/09 1 07 -21 AYS4 -00098 PRODUCTION PROFILE — 09/17/09 1 W -04 B81(5.00003 PRODUCTION PROFILE .. 09/24/09 1 P2 -53 AP3O -00060 PRODUCTION PROFILE 09/13/09 1 S -03 AWLS -00037 PRODUCTION PROFILE 09/25/09 1 12 -23 AWLB -00035 INJECTION PROFILE Q= 1 09/19/09 1 05 -38 AYTO -00029 LDL 1 7WAC4 09/18/09 1 W -29 AWJI -00050 MEM INJECTION PROFILE 0 ft 09/20/09 1 W -30 AYIM-00034 PLUGBACK W/X -FLOW CHECK >. -0/12109 1 3- 37/L -35 B3S0 -00024 PRODUCTION PROFILE V 09/16/09 1 NK-09 AP3O -00057 USIT — 09/07/09 1 W -07A AWJI -00047 MEM CEMENT EVAL ATION 09/07109 1 1 11 -10 AYTU -00054 USIT 08/28/09 1 02 -06B ANHY -00111 US IT 09/21/09 1 G-1 8A AWJI -00048 MEM CEMENT BOND LOG C 09/17/09 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503.2838 i �2 PROACTIVE DIACINOSTIG SERVICFS~ INC. SELL LQ ~1~~4/~1~~'/T7'~L To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT] The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petlrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and I~~I-~3 i~~~~~ ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C 200 Anchorage, AK 99518 ~~~ ~~~ ~ ~ Fax: (907) 245-8952 1) Gas Lift Survey 02-0crr09 MPLJ C-05A 2] ~~ Signed : , ~~J Print Name: 1 BL / EDE 50-029-2124401 Date.: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 w. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (9071245-8951 FAX: {9071245-88952 E-MAIL : _-- -- -- _-- - - WEBSITE : _ _. _ CaDocuments and Settvigsl0wnedDesktop\Transmit_BP.docx • . VV~~~ L~~ T "RA/VS-ft/1/T ~"'~4 L PRO/~Ci1VE DINCNOSIIC SERVICES~ INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907j 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing (nspection[Caliper / MTn The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska), (nc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Bh~d. Anchorage, Alaska 99508 and ProActive Diagnostic Services, lnc. Attn: Rolxrt A. Richey 1~0 West International Airport Road Suite C Anchorage, AK 99518 Fa~c (907) 245$952 1J 2) Signed Gas Lift Su-~vey 13-Ju1-06 MPU G~5A 1 Print Name: ~ ~~,~ ~c~ 3 ~~ ~~~ ~'~G~~~~~~: ~vr~ ~' ~. ~ ~~1~~ BL / EDE 50-029-21244Q 1 Date : ~ ~ ~ ~ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 Fnx: (907)245-88952 E-MAIL ~~__.~. " a~.~: _~~ WEBSITE: _~__ _ ~, _. _, C:\Documenfs and SettingslOwner`-.Desktop\Transmit_BP.docx 12/08(08 Schlumherger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth €~ ~ c~~~ it ~~~ ~., ~~, CJ ~UUf:} wou r,.ti ~ r .... new.. ...:.... NO. 4995 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 R-03A 4994 INJECTION PROFILE (REVISED) 10/08/08 1 1 13-23A 4994 INJECTION PROFILE 10/21/08 1 1 01-26A 4994 SCMT 11/13/08 1 1 D-29 4994 USIT 10/19/08 1 1 15-02B 4994 MEM PROD PROFILE - 11/25/08 1 1 H-05A 4994 MEM PROD & INJ PROFILE 11/20/08 1 1 E-32A 4994 SCMT ( 11/04/08 1 1 12-17 4994 PRODUCTION LOG O C,/ 11/04/08 1 1 P2-41 4994 PRODUCTION LOG - 11/07/08 1 1 1•-29/M-25 4994 PRODUCTION LOG 11/04/08 1 1 MPC-05A 4994 MEM LDL ~ 11/15/08 1 1 L-114A 4994 USIT ~- - (( S 11/03/08 1 1 A-07 4994 PRODUCTION PROFILE ~- - ( ~} 11/27/08 1 1 07-18 4994 INJECTION PROFILE ~- - 12/02/08 1 1 15-12B 4994 MEM PROD PROFILE Cp .- ~ Q ~, 11/27/08 1 1 4-40/P-43 4994 MEM LDL i9 ' `~ ~ 11/26/08 1 1 N-14B 4994 MCNL `~-~ ~ ` 09/20/08 1 1 01-21A 4994 MCNL 09/29/08 1 1 E-29A 4994 MCNL - ~ 09/01/08 1 1 DI CACC Ar•1lIJA1n/1 cnn_~ n~ ncor OV c~lnw ~l„i. w BP Exploration (Alaska) Inc. ~ - .. .'.-.'-~ v.-~ vv. ~^v" , v. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 8 8 ATTN: Beth Received by: oC Hi Howard, /8'1- Ä c..( ~ Unfortunately I have learned that the surface location I gave you about a month ago on these two wells is incorrect. The As-Built we have on record does appear to have the correct information after all. The surface location should be: 551' NSL, 2254' WEL, SEC, 10, T13N, R10E, UM X = 558211.74, Y = 6028834.07 c".: 0 1<\ This is for: MPC-05, Permit # 184-228, API # 50-029-21244-00-00 & MPC-05A, Permit # 184-243, API # 50-029-21244-01-00 I apologize for the trouble, but felt it is worthwhile to correct. Thanks again for bringing this discrepancy to our attention. Terrie .... Sf L APR 5 1604 MPC-05 & MPC-05A Subject: MPC-05 & MPC-05A From: "Hubble, Terrie L" <HubbleTL@BP .com> Date:Fri, 05 Mar 200408:15:04 -0900 Tð:~pw#4~q~iW4@ã~rhW..st~t~.~.*.tis. . Hi Howard, I apologize for taking so long to get back to you on these wells. You had called me about the surface location of them. There appeared to be a transposition of one of the distances, which you wanted to verify the correct distance. I have given the well file a thorough review and the surface location has remained consistent throughout. It should be: 543'FSL,2242'FVVL,Sec. 10, T13N,R10E This matches what our electronic database has as well. I think the original As-Built must be in error and will look further into that. For some unknown reason though, our records do not include the Completion Reports for these two well bores. Would you mind making me a copy for our records of what you have? These two wellbores are pretty old and the records came to us from Conoco. . Permit To Drill Number: C-05, 184-228 Permit To Drill Number: C-05A, 184-243 Thanks so much, Terrie Hubble MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner DATE: May 19, 2001 FROM: John Crisp, SUBJECT' Petroleum Inspector Safety Valve Tests Milne point Unit C Pad May 19,2001' I traveled to BP's Miine Point Field to witness Safety Valve System tests. Lee Hulme was BP Rep. in charge of SVS tests. Testing was conducted in a safe & efficient manner. This Pad is on 3 month test cycle due to failure rate above 9.9%. I reviewed the 8/12/98 supplement to the 3/30/94 SVS policy to discuss BP's options for keeping the wells with leaking Surface Safety Valves producing & injecting. Lee Hulme stated that servicing & repair of the valves could not be accomplished immediately. After review of the AOGCC Policy Supplement, I told Lee that the wells could stay on line if someone trained in Drill Site Operations manned the Pad. I requested the Pad be manned immediately & until the valves were repaired & re-tested. The AOGCC test report is attached for reference. Wells #7,8 & 25 were serviced & re-tested OK 5-20-01. Wells ~4,6 & 14 were shut in for repairs. SUMMARY: I witnessed SVS testing in Milne Point Field. 12 wells, 24 components tested. 6 failures witnessed. 25% failure rate. 20 well houses inspected. Attachments: SVS KRU 3K 5-18-01jc cc; NON-CONFIDENTIAL SVS MPU C Pad 5,19-01jc Alas~.a Oil and Gas Conservation Commiss.~a Safety Valve System Test Report Operator: BPX Operator Rep: Lee Hulme AOGCC Rep: John Crisp Submitted By: John Crisp Field/Unit/PM: Milne Point Unit C Pad Separator psi: LPS 140 Date: 5/19/01 HPS Well Permit Separ Set L/P Test Test Test Date o~ WAG, Number Number PSI PSI Tdp Code Code. Code Passed GAS or CYCLE c-o/ ' i8114~0 140 "loo llO p p , OIL C-02 1821940 C-03 ' 18205(30 140 100 951 p ,, p , , OIL C-04 1821260 140 100 110 P 4 OIL ~C-05A 1842430 140 100 100 p p OIL C-06 1842410 4300 2000, 1950 P 4 WAG C-07 1850020 140 100: 95 P 4 OIL, C-08 18501~0 '4300: 2000 1900 P 4 WAG C-09 1850360 '140 100 " 105 p p ,, .OIL C-13 1850670 C-14 '1850880 '140 100 100 P 4 OIL C-15 1851030 , , , C-17 1852630 i'C-20' 1890150 ' ,, , , C-21 1940800~ , ,, C-22A 1951980 140 100: 95 p p 0IL C-23 1960160 C.25'A 1960210 4300 2000 1900 P 4 WAG. C-26 1952060 C-28 1960290 i, C-36 1980010 C-39 1972480 , , C-40 2002130 C-10 1850150: 4300, 2000! 1850 "P p .... wAG Wells: 12 Components: 24 Failures:, ,. ~, Failure Rate: 25.00~A[~]90 Day Remarks: RJF 1/16/01 Page 1 of 1 SVS MPU C Pad 5-19-01jc MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner DATE: November 18, 2000 THRU: FROM' Blair W°ndzell, P. I. SupervisOr Lou Grima~l, ~ PetrOleum Inspect°r SUBJECT: SVS tests BPX C-pad Milne Point Unit Kuparuk River Field SatUrday, November 18, 2000; I witnessed the SVS tests on BPX C pad in the Milne Point of the Kuparuk River Field. This was the three-mOnth test for this Pad due to a 26% fail rate witnessed by Inspector Jeff Jones on 7/9/00. The wells did somewhat better this time although the fail rate of 13.6% was still abOve the 10% expectable limit. Again, the gas injectOrs gave us the most trouble with two SSV's leaking. One Oil producer also had a leaking SSV. The pilots all tripped within limits. Well C-03 had a slight gas leak on the Tubing spool adapter, Larry Niles (MPU OI advisor) will pursue this with the wellhead manufacturer as to proper repair and report back to me. The wellhouses were all very clean and it appears to be a high priority in the Milne facility. SUMMARY: I Witnessed the SVS test on BPX C pad in the Milne Point Unit. 1 pad, 11 wells, 22 components, 3 failures, Wellhouse Inspections; 14 wellhouses, 1 failure (leaking T.S.A.) Attachments' SVS MPU C pad 11-18-00 LG.XLS cc: Niles/Shipley (MPU OI advisers) NON-CONFIDENTIAL SVS MPU C pad 11-18-00 LG.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Larry Niles AOGCC Rep: Lou Grimaldi Submitted By: Lou Grimaldi Field/Unit/Pad: K.R.F./M.P.U./C pad Separator psi: LPS 140 Date: 11/18/00 HPS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GASorCYCLE C-01 1811430 140 100 120! p p OIL 'C-02 1821940 C-03 1820500 140 100 105 p p OIL C-04 1821260 140 100 105 P 4 OIL C-05A "1.842430 140: 100 105 P P C-06 1842410' C-07 1850020 140 100 110 p p OIL C-08 1850140 C-09 1850360 140 100 80~ p p OIL C-13 1850670 C-14 1850880 140i 100 105 p p OIL C-15 1851030 C-17 1852630 C-20 1890150 C-21 1940800 C-22A 1951980 140 100 110 p p OIL C-23 1960160 C-25A 1960210' 4000 2000 2000 P 4 WAG C-26 1952060 - C-28 1960290 4000 2000 2000 p p WAG C-36 1980010 C-39 1972480 C-19i 1852960 4000 2000 2000i P 4 WAG Wells: 11 Components: 22 Failures: 3 Failure Rate: 13.6%~190 oar Remarks: C-03 has gas leak on Tubing Spool adapter, Develop plan for repair and report back. ..... · ,___ , _~, ~ V0kl trl6.xls MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Dan SeamoUnt, Commissioner Blair Wondzell, P. I. Supervisor DATE: July 12, 2000 Petroleum Ihsp~ct~r Safety Valve Tests Milne Point Unit B & C Pads July 9, 2000: I traveled to BP's Milne Point Field to witness Safety Valve System tests on MPU B & C Pads. Testing was accomplished in a safe and: efficient manner by BP rep. Larry Niles. Seven failures were witnessed. MPU B-22 SV failed to hold DP. MPU C-04 SV failed to close. MPU C-05A SV failed to hold DP. MPU C-06 SV failed to hold DP. MPU C-09 failed to hold DP. MPU C-25A SV failed to hold DP. MPU C-28 SV failed to test because the tree cap o-ring leaked. The AOGCC test reports are attached for reference. Well house inspections were done on 21 well houses. All well houses inspected were clean and in satisfactory condition. SUMMARY: I witnessed SVS tests on BP's MPU B & C pads. MPU B Pad, 9wells, 18 components tested, I failure. 5.5% failure rate. MPU C Padl 12 wells, 23 components tested 6 failures. 26% failure rate. 21 well houses were inspected, no failures. Attachments: SVS MPU B-PAD 7-9-00 JJ SVS MPU C-PAD 7-9-00 JJ cc; NON,CONFIDENTIAL SVS MPU B & C PADS 7-12-00 JJ.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPx Operator Rep: Larry Niles AOGCC Rep: Jeff Jones Submitted By: Date: Field/Unit/Pad: Kuparuk River/MPU/C-Pad Separator psi: LPS 140 HPS 7/9/00 Well Permit Separ Set L/P Test Test Test Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code GaS or CYCLE C-01 1811430 140 100 95 p p OIL C-03 1820500 140 100 " 95 p p O!L C-04 1821260 140 100 100 P 4 OIL C20~A:~51~i 1842430 140 100 100 P 4 OIL C-07 1850020 140 100 100 p p OIL C-08 1850140 C-09 1850360 140 100 120i P 4 OIL C-13 1850670 C-14 1850880 140 100 100i p p OI~ C-15 1851030 C-17 1852630 C-20 1890150 .. C-21 1940800 _ C-22A 1951980 140! 100 95 p p OI~ C-23 1960160 _ C-25A 1960210 4000 2000 2000 P 4 WAG C-26 1952060: C-28 19602901 4000 2000 2000 P 43 WAG C-36 1980010 C-39 1972480 C-02 1821940 4000 1900 p p WAG C-06 1842410 4000 1900 P 4 WAG Wells: 12 Components: 23 Failures: 6 Failure Rate: 26.0%[] 90 Day Remarks: Wells # C-02 & C-06 are listed as water injection wells, and are not in this database Well # C-28 SV could not be pressure tested because the tree cap o-ring leaked. The SV on well # C-07 recorded a slow closing time;(2:27). Larry Niles, the BP representative, said he would have these items corrected. TO: THRU: MEMOR/klA Lonnie C Smi~/.~ Commissioner/-: Blair Wondzell~'~/~ P.I. Supervisor Harold R Hawkins FROM: Petr Inspector oo.laska DATE: FILE NO: April 14, 1992 hh414-1.doc TELEPHONE NO: SUBJECT: "NO Flow" Test Conoco MPU C5-A Kuparuk Rv Field Tuesday, April 7~ 1992 I left Anchorage at 7:15AM by Alaska Air to Prudhoe Bay, arriving in Prudhoe at 8:45AM. I arrived at Conoco Hiine Point at Ii:45AM to witness a "no flow" on Conoco MPU C5-A. Welders were working and bleed down of gas couldn't be done. wednesday, April 8. 1992 charts were put oil at 7:00AH and a bleed tank was in place for gas bleed down. I gave instructions that while bleed down was in progress to strap tank and record volume of fluid. Thursday, April 9, 1992 The well was bled down and no gas or fluid was coming to surface from 3:00PM on 4/8/92 to 7:00AM 4/9/92. I filled out an AOGCC field test report, which is attached. In summary, the "no flow" test on Conoco MPU C5-A was performed correctly and was successful. I told them it was okay to take the SSSV out. Attachments 02-O01A (Rev. 6/89) 20/11/MEMO1.PM3 . (. AOGCC NO-FLOW TEST FORM" ( DATE If-I? -7 '- WELL.. /': - ç- // .,. r . -- ." -T I IME OPERATOR W/H PRESS TANK STRAP COMMENTS J. t K-rf)- IS-~ II 'j/£Q Q.J}Æ r.) / 1/ ~aP //1/ t (l v' e [.. Ci') () to ße Gøs. l1.¡(e4/(¿)ur kl~ñ ':) IS-{ øf( ïëmA uk,,;, ~ ~ II (j I ~jM J( 0 12.- 't -- !, /'1po / I 5' . I \ ,. .- ~iIt- / I fi/z " -:;.,' 12-1 2-D 0 ~/!j¡,{ ~:.rt "'-"';" '1,' :25Cb M<- ô I I S' " ...... . /2 t:J /'/'2 _.~... - - '-.'-. -. JulC ti~ '1 -" P'" -- 6/ ;0 ð / I ,.,j¡¡. , ~. () 3 zo JMK (J I 1,-1'/Z-'1 JVt, j'ó/i " / ' 0)00 0 I' '" .tJ 70cJ //rl1--- {;) ) I .--:// rJPI5t!Gt; 2.'t) 0 AJIt Yl'jf:( --S% ' ., -, . ~./ j: "' - -- .' .' ~:~ !~;~~ ~. .. ., ".-- '" - . - " Ts .' ~: . ' - . .-:-. ~" '. r"" ,.. .. .p.. ,,",": - - '," '~"O ~ '."- ~'; ~: i-.::'" ~ ~; ,:¿'~7'~~q~~~~~~t.~~ ~f,: M' '.- 1f:"'~~{~};:f.~:ç\,1;i~.i~~}.~:~";~~li! " "I;¡i~ ,ï -If.:"." ¡"'. ~--: '~;T ',{i#.4~ ~:~~.:' . '~,~; " -~'. --c- '~i~- _.~{~~~.~~.~~:~.:~:.~~~.~¥~~.>~~t~~.~ :'~. ~..~; ., .~~~,-:..;¡!''-~':., ..¡, {:. .,,',.: r" " '" :,~:~¡.w- "" '~ ,. '.' .. ....' ,.'Ç .'-.' ~: ~.~:~ ,~~:.'.' '" , ,-~,~;, \:'i.;: .- <.:'~~;'.~.;:;~:' '. ::,~::".~...; ?'~;~~%:,.~~.'{&~~1r:.,'.. -', . .~- -. ..-..--.- -----"..-'----'-------..----..---- o o -: \ . - .~. '.~? ~ ".,: _ -- - ~, ,~ . ~ - I --4 .... - -.-/ '-/.::-~'-'? :1~ / :.- ..,:/. / // '--:... , :.., ':/ . / ,,"., / / ~ / x~< ~ '/ / ', ~ · I / .'C .... . / ", ' ,.-~ / . .,, .. /-../ / . . ..~'~' ,, ,.~ '/ ., ".,/ / /:>/ .. ~ ' ' 4.,~': '. / . ,; ,"".. /' XI: .X ' ~9'N .."' / / , / ~,'",~ .:: ,/. x>(>. . /,,.. / / .. :: ./, ',,,. ~:. . ,," / ~ ?: : ' /. .X - ,, · / 4, . ~ , ..' '~,,, /. ./ .~M~ ...... ' / x. / ,", './' ', V , '~ - >/ .4"' ~ '. ,~- Tom Painter Division Manager Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 February 24, 1987 Ms. Fran Jones Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Ms. Jones: Enclosed please find the drilling "well history" from Conoco's Milne Point Unit well No. C-5A. Also enclosed is a copy of the well history for Milne Point Unit well No. C-5 along with the cover letter trans- mitting the original report(s) on August 13, 1985. If you require additional information concerning these well histories, please contact Don Girdler at 564-7637. T/R. Painter Division Manager DRG/vv C-5 and C-5A well files FEB 2 6 1987 Alasks 0il & Gas Cons. C0=mlssi0n Anchorage Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Pt. C No.5A- CONFIDENTIAL (10,000'-Kuparuk River) AFE 10-61-1077 API No. 50-029-21244-01. Ak. Permit No. 84-228. Elevation: 52' KB. Location: 543' FSL, 2242' FEL, Sec. 10, T13N, R10E, Umiat Meridian 12-22: Logging, Ran GR-SP-Cal, DIL, CDL, CNL from 9470' to 8000'. Rig down loggers. RIH w/bit. Cut drlg. line. RIH to 9474'. Wash 36' to bottom and line. Drop survey, pump slug. POOH taking surveys. Retrieve multi-shot survey tool. Finish POOH. RIH to 9320 w/plug catcher @ 8917'. Make circ. head 1/4 and circ. bottoms up 3/4. Pumped 660 sks. class G w/l% CFR-2. Displaced to 8917' w/mud. 12-23: POOH. Pull wear bushing. Make up test plug. Tested BOP's. LD test plug installed wear ring. RIH open ended. RIH & tagged cement @ 8891' (witness - Ben LeNorman AO&G). POOH standing back HW and laying down 25.60#. Lost all rig power, found shorted cable and repaired. Restarted rig. LD 50 its. 25.60# pipe. RU cementing head, end DP @ 6295'. Circ Cement 2nd plug 200 sks class G w/l% CaCi~ (6295'-5895'). POOH w}5 stds. and circ. Cemented conductor w/50 sk~ class G w/l% CaC12. POOH laying down DP. 12-24: POOH. Lay down 15 its. DP. PU MWD and RIH to 4965'. Circ. & WOC. Test csg. to 400 psi. RIH. Topped cement @ 5965'. Drilled cement 5965' to 6090'. Circ. POOH. RIH & orient. Drill 6090' to 6100'. 12-25: Drilled and oriented from 6100' to 6433'. Service Rig. Drlg. & surveying from 6433' to 6683'. POOH to 6000'. Repair O-ring on water junket in low clutch. RIH. Drlg. and surveying from 6688' to 7440'. 12-26: Drlg. and surveying from 7440' to 9080'. 12-27: Drlg. and surveying from 9080' to 9856'. Circ.; Drop single shot survey; pump pill. POOH. Lay down Navi-drill, break out bit. Service MWD; PU BHA. 12-28: TIH. Slip and cut drlg. line. TIH. Repair rotary chain. Drlg. and survey from 9856' to 10105'. Repair rotary chain. Drlg. and survey from 10105' to 10182'. 12-29: Drill and survey. Work on rotary table chain. POOH to csg. shoe. Repair rotary chain. TIH. Drill and survey. Drop single shot survey; pump pill. POOH. Lay down MWD. 12-30: Change BHA; Retrieve survey; change out bit. Pull wear busining; set test plug; test BOP's, retrieve test plug. Set wear ring. TIH. Drilling. F E B 2 6 1987 Alask~ 0il & G~s Cons. Comm~ssio~ Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Pt. C No.5A- CONFIDENTIAL (10,000'-Kuparuk River) AFE 10-61-1077 12-31: Drill to 10867'. Drop single shot survey; pump pill. POOH. Lay down 10 jts. D.P., retrieve survey barrel. Change out bit. TIH to csg. shoe. Slip & cut drlg. line. TIH. Drlg. Repair wt. indicator. Drlg. 01-01-85: Drlg. from 11164' to 11200'. Circ. Short trip 15 stds. Circ. & cond. hole. Drop survey; pump pill. POOH. (S.L.M.) No correction; tight first 10 STDs. RU Schlumberger. RIH w/DIL_LDT-CNL; Tool stopping at 7800'; could not work past 7860'; POOH. Remove standoff & hole finder; RIH; tool stopping 7900'. Work done to 7960'. POOH. Install wheels; T.I.H., tool stopped at 6800'; POOH. RD Schlumberger. RIH to 7900'. 01-02: Circ. Finish T.I.H.; Fill from 11145' to 11200'. Ream and circ. Circ. & cond. mud. POOH. RU Schlumberger. T.I.H. w/DIL-LDT-CNL to 9960'; Could not get past 9960'; POOH. Add 400# wt; T.I.H.; could not work tools past 8702'; POOH. Lay down LDT & CNL. T.I.H. w/DIL and wt. to 8702'. RD Schlumberger. T.I.H. to csg. shoe. Cut drlg. line. T.I.H. to 11197'. 3' of fill. 01-03: Circ. and condition mud w/reciptocating pipe. Short trip to 7892' (35 stds). Tight. Circ. bottoms up. Short trip. Circ. and mix pill. POOH (work pipe thru tight spots 10800'-10610') Pump 9 jts out. POOH. 5 additional stands and RIH to 10550'. Ream F/10550' to 10838'. Ream and lay down 9 jts. drill pipe 26.0 to ream to btom. Reaming @ 10874'. Trying to ream to bottom. 01-04: Ream to btm 11200'. Circ. & reciprocate. Short trip 15 stds. NOTE: Depth 9747' last tight spot w/10152'. 100,000 less drag than last trip. POOH. (stand HWDP on drill side). BHA out of way. RU Schlumberger tools (pick up to rig floor). Pick up and strap 40 jts. 19.5# E grade drill pipe and mule shoe. RU Schlumberger shoove in derrick @ crown. Cut drilling line. RIH w/drill pipe to 10342'. Break circ. and circ. inside volumn of drill pipe +. RU Schlumberger w/line wiper and pack off to drill pipe. RIH w/DIL (inside drill pipe). 01-05: RIH w/DIL log thru drill pipe and POOH w/logs. Depth of logs 10720'. Repair rig, air compressors and drum clutch. Lay down , pump down sub and Schlumberger. RIH to 10747'. Circ. 700 sks. RU Schlumberger. Logging w/IRT-J. Run #2 to 11005'. PU 11 jts. DP. & wash from 10970' to 11100' w/working pipe. POOH to 10945'. RU & log w/IRT-J. Run #3 to 11038'. Lay down 1 std. dr. Logging run #4 w/IRT-J. POOH 1 std drillpipe - logging run #5 w/IRT-J. RD Schlumberger. Run in 2 stds and circ. btms up. NOTE: Logged interval 10780'-11014 (wireline measurement). 01-06: POOH. Laying down drill pipe needed to log loggin interval. RIH w/BHA (new jars) for wiper trip. Service rig. RIH for wiper trip. Circ. 1 circulation (surface to surface). POOH laying down DP. Cut drlg. line 200'. POOH. Laying down DP. R ~~~ f~ ~ ~ ~ ~ TM F t :.9 2 6 1987 ~a. sks. Oil & Gas Corls, Anchorage Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Pt. C No.5A- CONFIDENTIAL (10,000'-Kuparuk River) AFE 10-61-1077 01-07: POOH Laying down BHA & clear floor. Chagne rams top set to 7" and pull wear ring. RU and run 7" 26# butt. L-80 csg. Repair pipe machine. Run 7" csg. and make up mandrell HCR and landing jnt. Make up CMT head & break circ. slowly, Started reciprocation and lost circ. Land 7". Pump 50 BBLS Desco 2PPB preflush - test cmt lines to 5000 psi. Pump 900 sks class G w/I% CFR, .3% AAL-24 , 15.8 ppg. Chase cmt. w/2 BBLS H20, top plug and 426 BBLS 10.2 NaC1. Bump plug w/1250 psi Set packers w/3600 psi. 01-08: RD Halliburton. Lay down landing jnt and csg. tools: RU Dresser/Atlas. Orient Gyro. Run Gyro #1 , Sperry Sun. Run gage ring and junk basket #2 run. Rehead logging woreline. Run GR/CDL/CNL #3 run. After log verification f/density, gamma ray, neutron, PCM. Change bridle and check F-2 2 5" guns (capped 2 guns) Perforating gun run #3 run (gun left in hole) Make up new perforating tools (change rams while waiting 3 1/2). Perforating intervals 10874'-10884' (10 ft) 10894'-10901' (8 ft). Dresser Atlas 12 SPF 5" casing gun. 01-09: Perforating Run #5. RD loggers. RU to run tbg. and run tbg. Drift tbg. hanger - no ho - wait on modified tbg. hanger. Install tbg. hander and control lines and test. Land tbg. and install TIW valve and break circ. Attempting to break circ. Completed 2nd stage cmt. Permafrost 17 BBLS. 15.6 ppg. 200 sks. Completed Arctic Pak of annulus, 7.7 ppg. 01-10: RU diesel line from fuel tank - drop ball - allow to fall. Pressure up on packer and shear out and pressure up on back side. Seals in HGR failed. Pull to rig floor and change seal and land tbg. in wellhead. Energize lock down screws. Test in 3 1/2" X 7" annulus 1500 psi. Test O.K. Remove stripper rubber from BOP stack and rig up to displace tbg. RU to displace tbg. Rig unable to pump diesel. Air and frozen lines. Rig up vacuum truck to take on diesel and Recharge rig pumps. Displace tbg. Initial pressure 700 psi. Final differential 1100. Land tbg. Test SSSV. Back out landing jnt. Test back side to 2000 pis. Install back pressure valve. Change rams to 5" . Nipple down BOPE. Dress packoff area and install tree. Remove back pressure valve. Install 2-way check. Test tree 5000 psi and remove 2-way check. Install BPV and test tree. Rig released f/well C-5A 0230 hrs. 1-10-85. Prepare to skid and skid rig to well C-6. [conoco_ Tom Painter Division Manager Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 December 23, 1986 Mr. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99503 Dear Mr. Chatterton: Temporary Shut-in of Production and Injection Wells Within the Milne Point Unit As you are aware, Conoco et al. has filed an application with the Department of Natural Resources to temporarily discontinue production operations at Milne Point. The attached sundry notices are intended to serve as notice of the pending temporary shut-in of all wells located within the Milne Point Unit. There are 19 active and 5 inactive production wells at Milne P~-int AC%IVE: B-3, B-4A, B-6, B-9, B-10, B-il, B-!3, B-!5, B-16, C-l, C-2, C-3, C-4, C-5A, C-7, C-9, C-13, C-i4, C-!6 STATIC: B-20 B-21 B-22 C-17, C-18 Ail active production wells will be freeze protected by displacing the top 3000' of the tubing with a 1:3 diesel:oil mixture. The annular fluid levels will be monitored for leaking gas lift valves. If necessary the production' casing annulus' will be displaced with a diesel:oil mixture to at least 3000'. Once the shut-down operation is completed, pressure surveys will be run in all production wells. After the surveys are run BPVs will be installed and all SCSSVs and wellhead valves will be closed. The inactive production wells have been adequately freeze protected with diesel across the permafrost. There are currently ten active and six inactive water injection wells in the Milne Point Unit KF' ? ~ ~i ! ACTIVE: B-8, B-12, B-14, B-17, B-18 C-8, C-ii, C-12, C-15 CFP-2 STATIC: B-5A, B-7, B-19 C-6, C-10, C-19 Active water injection wells will be freeze protected by displacing the tubing to at least 2000' with a 50:50 water:methanol mix. The SCSSV and wellhead valves will remain open for two to three weeks after the well is shut-in to monitor wellhead pressure. -When adequate wellhead data has been obtained the BPVs will be set and the SCSSVs and all wellhead valves will be closed. The static injection wells are currently freeze protected and no additional work will be required. Injection water is supplied by three water source wells. Though only one well is active at any given time, all wells are capable of produc- ing. A-2A; B-i; CFP-1 Water source wells will be freeze protected by displacing the tubing to at least 2000' with a 2:1 propylene glycol:water mixture. After the wells have been displaced with.the glycol:water the BPVs will be set and all wellhead valves will be closed. The E-2 gas storage well has been shut-in since July 1986 due to a tubing leak. The wellbore is filled with natural gas so that freezing is not a concern, but to prevent potential corrosion an inhibitor will be displaced into the well. A 50:50 methanol:water mix will be used to carry the inhibitor. If you have any questions on the shutdo~ orocedure please contact Don Girdler at 564-7637. Yours very truly, Manager STATE Of ALASKA ALASK'r~-'OIL AND GAS CONSERVATION COMrv,.._.~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown : Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator Conoco Inc. 3'Add~l C Street, Ste. 200, Anchorage, Alaska 99503 4. Location of wellatsurface 534' FSL, 2242' FEL, Sec. AttoB ofproductiveinterval 4820' FNL, 4298' FEL, Sec. At effective depth N/A At t94t~LCCPtt~L, 4595' FEL, Sec. 10, T13N, R10E, U.M. 9, T13N, R10E, U.M. 9, T13N, R10E, U.M. 5. Datum_ehgvation (DF or KB) 59' KB 6. Unit,or, Prop, erb/r3art-~e .. ~,m..Lne 'ro3.nc un3. c 7. Well number C-5A 8. Permit number 84-243 9. APl num¥2r9_24244_O1 50-- 10..PO~uparuk River feet 11. Present well condition summary Total depth: measured true vertical 11200 7349 feet feet Plugs (measured) Effective depth: measured N/A true vertical feet feet Junk(measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 80' 5983' Measured depth True Vertical depth 16" 9 5/8" To Surface 115' 115' 2950 Sxs 6019' 4488' 11057' measured true vertical 7" 1170 Sxs 11091' 10894'-10902' 7138'-7143'; ; 10874'-10882'; 10784'-10804' 7124'-7130'; 7063'-7024' 7354' Tubing (size, grade and measured depth) 3~", L-80, 10533' T.R. SCSSV @ 1946' Packers and SSSV (type and measured depth) .; Ret. Pkr. @ 10517' 12.Attachments Description summary of proposal ,~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation January 1987 14. If proposal was verbally approved Name of approver Date approved 15. I herel;)y-ee.~tify tha~t the foregoing is true and correct to the best of my knowledge Signed -,,1..,~_.,)n¢~..__~_}~.~ ~_ _ _~- Title Sr. prnd,,~r~nn Commission Use Only Conditions of approval Notify commission so representative may witness I Approval I Date No. Approved by [] Plug integrity Form 10-403 Rev 12-1-85 [] BOP Test [] Location clearance · . ,~ ~ ...~.-~; -~ ~ · Commissioner by order of /. the commission Date/~?_~;~ /(../'~. Sub(~it if~ triplicatu Tom Painter Division Manager November 24, 1986 Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 Mr. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Conservation Order No. 173 Rule 9 Conoco requests exemption from Conservation Order No. 173 Rule 9 for the Milne Point C-5A well. This well is producing less than 200 BOPD from two horizons; the Middle Kuparuk (10,784'-10,804') and the Laminated Zone (10,874'-10,882'; 10,894'-10,902'). The accuracy of flowmeters is limited by the low rates and the well is not supported by injection and therefore no productivity improvement is expected. T~ R. Painter~~ Division Manager DRG/kr cc: Well File 0 986 Oil & Gas Co~. ~mmi~ion Anchorage STATE OF ALASKA ALASKA 0~L AND GAS CONSERVATION CO~)[MIsSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Conoco Inc. 3. Address 3201C Street, Suite 200, Anchorage, Alaska 4. Location of Well 534' FSL, 2242' FEL, Sec 10, T13N, RIOE, 99503 5. Elevation in feet (indicate KB, DF, etc.) 52' KB I 6 . Lease Designation and Serial No. 47434 7. Permit No. 84-243 8. APl Number 50- 029-21244-131 9. Unit or Lease Name Mi!ne Point ~Jnit 10. Well Number C-5A 11. Field and Pool Kuparuk River 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other __[~ [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). .- . :~:./.-._ :~ This well was brought on as an oil producing well O'n 12-12-85, and its suspended status should be removed. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sign e~t/~~~~-~/// · Title (~ho;~%slO;I/~for CFApprova~7~SnS;~n use Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate __1 I ll SItAr I LAGOON ., z' _:' [~] I ~ I" ! -- I "I-- F'I'I ! t, [ .j lOCATION IN SECTION FR0he S. LINE 1168' FROM E. UNE 2256' SCALE IN MI,~S CONOCO . MILNE POINT UNIT EXISTING DEVELOPMENT NOTES: I. STATE PLANE CO-ORDINATES aRE ~O. NE 4. 2. ALL GEODETIC POSITIONS ARE BASED ON N.A.D. 1927. 3. OFFSETS TO SECTION LINES ARE COMPUTED BASED ON PROTRACTED VALUES OF THE SECTION CORNER POSITIONS. 4. LOCATED WITHIN SECT. I0, T 15N, RIOE, U.M.,AK. STATE PLANE CO-ORDS. NORTHINGS 6,029,450.20 EASTINGS 55 8,20~. 57 GEODETIC POSITION LATITUOE 70029. 27. 868"N. 70029. 2~. 471" N. LONGITUDE 14c~' 31' 27.056"W' 1229' 2459' 6,029,509.93 557' ,999.98 149° $1' 33.034" W. 139§' 2:526' 6,029 ,677.42 558,1:~1.06 70o29. 30. 108" N. 149051. 29.137'W. 1'544' *-2494' 6,029,624.27 557 ,963.42 70029. 29. §98" N. 149° 31' 34.085"W. 551' 2254' 6 ,028 ,834.07 558 ,211 .74 70°29' 21. 807"N 149° 31' 26.957."W. 6 ,028,947.80 6 ,029,290. 40 558 , 175.18 5.58 , 065.29 558,138.49 558 ,031.82 558 , 101.82 70°29'22.929~ 70°29' 26. 307"N rD°Z9' 24. 055"N. 70°29' 27.340"N. 70° 29' 25.184" N. 665' 2289' 1009' 2396' 6 ,029 , 395.22 6,029, 176.48 I C~_~"8 j 780' * 2325_____~' 6,029,062.00 !~4" 2428' . 23eo' 149° 31' 28.007"W. 149° 31' 31. 162 149° 31' 29.060" W. 149° 31' 32.123"W. 6. I, 85 149031. 30. 113" W. DATE CHEC~Eq 6.1,85 J.B.S. 10.~0,84 J.B.[ ' l' 3. ,85 d.B # · CERTIFICATE OF SURVEYOR ~[GtST~ED AND LICENSED 10 COCar,oN SU~V[Y MaDE 24- 84 # # 22 o8~ COuUENTS: ENGINeErS .amid ~J~vl-.YO~,~, & SCALE :' [ SHEET : I' · 400' [ I OF 2 --- Sucveyed for CONOCO [FIEL0 BOOK 22 -85 'C' PA D AS' BUILT WELL LOCATION John R. Kemp Manager of Alaskan Operations Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 August 20, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Enclosed please find the original and one copy of the "Well Completion" form #10-407 for Conoco's Milne Point Unit well No. C-5A. If you require additional information concerning this completion form, please contact Kent Stolz at 564-7641. Very truly yours, R. J. Francis Manager - Engineering STATE OF ALASKA ALASKA i~.~. AND GAS CONSERVATION C~ISSION tI ELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Conoco Inc. 84-~?.%8- 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage, Alaska 99503 50-029-21244~ ( 4. Location of well at surface 9. Unit or Lease Name 534' FSL, 2242' FEL, Sec. 10, T13N, R10E, U.M. Milne Point Unit At Top Producing Interval 10. Well Number 4820' FNL, 4298' FEL, Sec. 9, T13N, R10E, U.M. C No. 5A At Total Depth 11. Field and Pool 4802' FNL, 4595' FEL, Sec. 9, T13N, R10E, U.M. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) t 6. Lease Designation and Serial No. Kuparuk River 52' KBI ADL 47434 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 12-25-84 1-2-85 1-19-85 N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. DepthwheroSSSVset I 21. Thickness of Permafrost 11200' (7349'TVD) 10990' (7203'TVD) YE$~ NO [] 1946 feetMD 1800'_+ 22. Type Electric or Other Logs Run 9IL-IRT-J-GR/CDL/CN HP/CCL/Temp. 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 9 5/8" 47# L-80 O' 6019' 12~" 950 s× Class sx Permafrost E 7" 26# L-80 0' 11,091' 8~" 1170 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10,894'-10,902' (L-9) 12 spf, 120° phasing .3~"_ ;9.2~.L-gf 1~_5~'. 1~.~17'_ 10,874'-10,882' (L-8) 12 spf, 120° phasing 26. ACID, FRACTURE, CEMENT SQUEEZE,ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 10,784'-10,804' (Middle Kup), 12spf,120° pha.q~ng ~40 bbl K-1 emulsion 40 bbl Hot diesel pumped 14D hhl ~l-~r'lc rl-~p~l 27. PRODUCTION TEST (Con' t belo?) Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water· Submit core chips. 210 gal Xylene 500 gal 10% Acetic Acid lOOO..-gal 7~% Hcl ~' ~ "~ ~i~ i '\? F ~ 1000 gal 12-3 Hcl-HF I< ~ ~ ~ ' '~'-~ 1000 gal 7~"~ Hcl 1400 gal Diesel ^!ask~ 0i) & u~s Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. .' ..... ~ . ' . -,~:- c ':.,:,¢'~' '-: ;r't ~,.-"':f':.~'~.-'.-' " "' GEOEOGICMARKERS ' ":: ' .-:' -'" - - · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and :time of each phase. Middle Kuparuk 10,788' 7,066' Laminated Zone 10,804' 7,076' Lower Kuparuk 10,989 ' 7,203 ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed //~/~ J. ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (Where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 May 22, 1985 Directional Services Pressure Services Chemical Transmission Systems Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Att: William Van Alen CONFIDENTIAL Our Boss Gyroscopic Survey Job No. AK-BO-50002 Well: C-5A Milne Pt., Alaska Survey Date: January 7, 1985 Operator: J. Samec William Van Alen: Please find enclosed the copy of our Boss Gyroscopic Survey on the above well. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard District Manager Enclosure (2 copies enclosed on the above well) cc: According to distribution list NL Sperry-Sun/NL Industries, Inc. P.O. Box 6207, Anchorage, AK 99502-0207 (907) 563-3430 MA Y e Alaska 0il & Gas Cons. AnChora~le CONOF:I], INC. M I LNE PT. ALASKA ........ sF;ERRY-S;I_IN'' WELL SLIRVEYING CI]MF'ANY ANCHCIRAGE ALASKA ' CF, M-~;i-iTA T I ,Z,N DA TE ,JANUARY '~, 1 ?`':--:5 VERTICAL SECTION CALCLILATED ALONG CLOSURE F'AGE 1 DATE_OF. SLIRVEY ...., IANLIARY 7, l '-? '-' :-.-. ,=,._, BI3SS GYRI]ISCCIF'IID SURVEY ,_iCIB NUMBER AK-BL'I-50C)02 KELLY BUSHING ELE_V ..... = 52. c)0 FT. OF'ERATOR-SAMEC MEASURED DEPTH ........ T R LIE ............ §Li~: SE A ..........F"!-Eii:['~§ ~: ........... l::]:'.]-~'-i ~: i~; E ............ [ioF~-.L L E Q ............................. :1: iZi:l:~ E ................................ VERT I L-:AL VERT I F:AL I NCL I NAT I ON n I RECT I ON SEVER I TY REF:TANGLILAR COORD I NATES VERT I iZ:AL DEPTH ....................................................................................... DEPTH DEG M I N DEGREES~...... = ...................... [lEG/100 N I~''_l R ~ H / ...':; LIUTH- . ................... EAST/WEST SECT I ~" 0 0.00 -52.00 F) 0 N 0. 0 E 0 . . - 56. :39 0 100 100 00 48 00 0 :3:3 ~ E :300 29'~. '~9 247· '29 0 30 N 5.10 E 0 40 C) :R ..... 99.99 347 .9. 9. 0 27 N ._,~=. A_ ?~. E ...................... Bd'~i ......... ~'~-'~)'7~ ~ ............ ~ ~ ~. '':~;7 .......................................... 1 lz:S .......................... N 1~;~/'"]~ :...o .......... W 600 ._,~ ~. '-: 547.95. _ 1 7 N 18. o..'"'~ ' '~ N '-' 700 69b~. ~ 647.92 1 o - ..... 10 W . 747· 7y .:, o4 N ~';5 ,.,0O 79'2 79 " '" '-' 'mA0 ~99.45 8.47 45 ~, 40 N 68 '~'' 1000 ' ' '-' ? ~,:, ' '~ . W . o,:, '246 68 '-' '-'~ · o ~.-, N 76. ................. ~"~-0~ ..... .................... ~"~':' ~ ~ ................ ! ~4~,e. 1'2 11 4 ;-, .................... N ,=,;=:=u ......... 6 6.~ ..... W 1200 1194 '~'~ 1142 '-"" ~ ~ .:,~ 15 20 N '"'-' 50 W 1300 12~0... 12 1238 . 1~ 17 SA_ _ N ,:,~':":'. o? W ..................... 1 ~'(~ 0 .......... 1 L~'- o a~ 4.70 ,~' o:~,:~.T,.. ~. 70 .............. :".s, ;. .......... ..,: ..~:=, ....... ,~;~- .... ',5.~;~ -:5;5- ...... '",:, 1~' ] ~,OC 1478, 01 1426.01 ~ 11 N ~,'"':'.., , 10 W 1600 1569 '"" , _. 1: N P'" ,:,;~ 1517 R9 24 . . ~, _,.:, 1. W · 00 0.00 · .56 0.27 :--; .. . . ..,._, 61 0 11 ':' · · 0,. 05 0.74 N 0' .... C, ...'~; ................... ~'-.'· 1 ._,'--' N 0.0L.-': 4·06 N C) · 'P5 6 · 30 1'4 1 '='"" 9..,::; .) N · ,..,,--, .-~ (- '" 24 12 ....... N · .'. · ~ :2.'.:.'`'C) 16.11 h,I ............................ .:,. 44 19 5:--: IW "" ~'-.-,' ">':' '-."','2 N "' 61 .,:'-'/::,. ,"-,':.'_. N .,::.. 0.00 0.00 0.41 E -0·40 1.14 E -1.13 1.50 E - 1.50 1.58 E -1.5'2 1.27 E -1.29 0.5':.-`' E -0.63 0.79 W 0·73 4.52 W 4.4:3 11.80 W 11.68 23.53 W 23.37 40.72 W 40.53 6:3 ':~'~' W ~ '-' 69 . .. ~ ~,. 92. :31 W '~2.05 ....................... .1.6{.}l'~lt 77 ,1~..' <I N 7.-.. 6.. W .... 1 "/~;/:i .......... 4~.1:' ........ C) N ~; ', _ .' :: ':* "W ........ 240, 14 1800 1750 44 I ~o~, .-,= .:, --,,-, ~ ? o 44 27 N 7'2. :30 W .=,,=, ._,=.=,'-' . 17 N 284 .06 W z,=,o'-"-"-'. ~ , , ~ ._1 ~ i ._ ._i 34 ':' '='A 51 ~'~00 1,~'',,-, '~':, 17oA '-"~ 2'~ 45 N 79 :::9 W " 61 7'2 Iq 3:31 1':' '-" ':"- - ' :=:8 4':' 2100 2200 .........................~oOC):s :-; ":- '= ................ :¥... ................. 167. '~..,4 ................... =:5 ........ 11 ~,~ "'"~-. ~,4 ..................... :~:;;z;~,,.~ ........... 15',_, ......................... N ~;=; ..... ':5 -"" ~(.':' ') W 1. ,_,..'="~ 2400 2245.2:E: 21'23.28 3'2 47 N :E:4 · /:,9 W 1.87 2500 2320.56 2268.56 42 32 N 85.30 W 2.78 ................~,rsZ ]~-i- ..... ................... '.s':s;5:s--'=,-:=;~.., ...,.-. ~ .............. ::;.:~-~'i'-'i''''''=~':,4'~.._ -~ ~. ,~ ................... 4 ~.~ ............ ~:4 .............. N,_,':'~. .:,~-<".) W ...'"'._,.s~'-' 2700 2460.69 2408.69 4.9 16 N 85.19 W 4.22 2800 2524.61 2472.61 51 15 N 6:4.60 W 2.03 ................ :r4..~O0 ............................ ,s5~5.:S ...... ~ ....... o.'="'5- .................. ..-~,oo .:5 ~ :-' " :' -; ,.'=:").. ' '~.~,:c".., ............. 15 N ~'"::' . :=:0_ W 2 . 11 81 W N 4::-:7 14 W 2006, 78 1'254 7,9 '~= ":' 37 · ~..., 1 N 10 79 .=i,':'`' · -% · · -~ .' ii ~ h N A2.1 (') N _1.._ t) '--"-' ,,:::¢ 87.97 2035. ~7 26 .-""'~"._,~ . . . ~' ,.,':":',_, · 11 N 494 . ,_,,=, W ........................................................................................................ 436.35 494.0 :l '-?, 5 .7'.-? N ....,P] ~" z,~ . .94 W ._ .. o .~ ~ '-' '~.. '~.. U..'·:3!5 N 617.47 W 616.4,5 1 . i~1 , · ¢.),=, 07 Iq 6:--::3 ]'-' . · (. c, W /:,81 · '-76 · ~'-' . i1'3 62 Iq 7,_,'·01 W 750 '-' · . '="'.'~ A8 W °2'--' ::: 1 1'-.-`' .5;7 N .... ~. ........ · ...... 126.4.1 hi '701.66 W '.;700.40 1:34·41 N .980.31 W 778.'77 CONOCO, INC. C-5A MILNE PT. ALASKA SF'ERRY-SUN WELL SLIRVEYIN~3 -'F" L. JMF ANY ANCHORAGE ALASKA C!'OMI~;U~A'i; I ON £;A'FI~ .............. ,JANLIARY 9, l :,,=,._, VERTICAL SECTION CALCLILATED ALONG CLOSURE F'AAE_ .-'=' DATE F~F .... ,.::i IRVEY , IANUARY 7, 1,.~,-,='.. ,:,._, B 0'.:; S G Y R II S C 0 F' I C S U R V E Y ,JAB NLIMBEI:~ AI<-BO-5C)OC)2 KELLY BUSHINA ELEV. = 52.0¢) FT. C~F'ERATOR".=-;AMEC .......... ................................. TRUE ............... B'UB-S E A .............. (~i:~i3 R ~ E ...... i~. Oi IR gE ...... MEASURED VERTIC:AL VERTICAL INF:LINATION DIRECTION DEPTH DEF'TH DEF'TH [lEG M I N DEGREES D lEI G - L E G ]' 0 T A L SEVER I TY RECTANGULAR COORD I NATE~E; VERT I DEG/100 NARTH/SCILI]'H EAST/WEST SECT I Lt 300C) 2644.25 ';'5'.-72.25 55 12 N :=: :'.: . :E: ,...? W 1.95 143.10 N 10/=,0.':.?::: W 105'~.5F; . '"', .., ,-, -),-, - . ~" ~].':, ,. 4 N :=:2:, ._ 0 W 2 06 '~,2 4 :=:. 3100 27 A 0. (') 8 ..' ~ 4,:,.L ,=, 56 F, . 1 ._ ..... _ Iq 11 34 W 1 141 . ::: 1 .............. ::~;'o ...- Ou~ ............ ...-754"; ......... ~,7e ........... ..70."" ...... :-:~-. 'e_._,7 ................................. 57 ~.:. .............. N ou~;-: ....... ,:.'-="~; ................ W 1' '.' :35 ................... 1'~ ."-6 !'3-"N ............... 1 '~Z2/=.,' ~.:i]F-' W ............. 12:t._' 4. 65 ..~ ..... ,,-,,],.] .-, · ..-30L) . 57 · _,1 N 7?.69 W i ::-:0 7?. . ~ :37 ~7~6.3:7 . 1. 24. N 1309.38 W 1:307 60 · .- ..... .14 11.14 41 N 7:E: 60 W .."" q ~' ~ .. ...o ..... :, 194 97 N 1 ~._~ W 1,_,,_,.. M9 ...............~,OU;=~- -~-~ .............. s~,~.. 1 ... 07~ ..-,_~/_-,7. L) 7:~'~'~' ' .... ; .................... ~,..,e_?.] ...................................... 17 N 7,_~..:,o's 'v--~'"- W 0. ~:1. ..':' 11, -..~' ........ .=,:s N 14 7..., c,-,'- -'.-.,'- ,s:s ...................... W .[477.'72' 3:6£)£) 2?7:3 95 '-"' ' '-" '75 .... "- _. .......~..-1,75 57 8 N 77 6'.'.'-;W 1...-._ ',",~,:: :.24 N 'l..~.=;Zl.. 66 W 1=~'''',._ .... :q9 3700~.,~'qn'~ .... =-,~'-' 2977 ..... 53- 55 19 N 78 19 W 1 87 .-"-'4..~ .60 N 1 A_ 3 F,_, 94 W 16:33: .50 -- -J.~-O ......... -D7-,~'77~i7 ............ D'i~.~'=67 .............. g-~ .... ~:~- E--7-L-'].-.'_::'.--~-"~ ................. <i]-<.~:i .............. ~'~",-f:~.-'~' ................. i'7i?_4:'62-W ..................... .fYi jE'42 3900 3146 50 3094 5c) .~":' '-"" · .= .=,,=, N 77 '-'¢ ,.].-, .-.,-~c, 69 N 17'.-.';4.72 W 1'791 '.-.-;6 · . ,, .. ,, C, ..;' W 1 . ,=.." ~.. ,,,., · . . 4000 o~07.09 ..':: ~ ~ ..,.,=-='. 09 52 45 N 76 .,:,U'-'' W 0, ,_,,..,'=":'2'.-.'?A, _. 1 :l N _1, ,:,7.~'"" '-'. :34 W 1 ,_,6 .;. 4(.') ................ ~4-'i'i:.'i'6 .............. J.:2 ~'7';-8 6 :~;:-';'-~._,,=. · ,, ='.' o':'" 'v ........... ._,e.';:;... ..... :-=';;~= ~ ..................................... N 7 6. ,:,;;~ ~-.. W u.; .... ~.:~; ....................... 7 :'--"..-. 14.. _~ ':~.. Iq ..... Z '=) ..... zl.',~u:""?':L ...... W 1 ':} 4/-, .'~ 0 4200 "-'""'--" ''~ 59 '" '~ 5'-"; '=,":' ";' .... ' ')'-"-' · .:,..'-77.._ .. .-51 10 N 77.6(.') W 1 .42 1 .:.:, N '2n?/-., .:,'"'-;; W ......... ~.(. ~.:,. 11 .,..! · -, - ') .-,.'~ ,~,.':, .=,..q,a. ri P~ 2 (") 9 4c, 0~ 51 N W 0 ._ 7 1 W 8.::" · _~ .. -,-. 40 4 (') 0 76.,_,':":~.. ~,4':' .... ':' 72 N ':' ¢.-']'-' ':":' .........................4400='= ....... -rS~:,455 · ........................................... 06 r_-_;-' '=:=F-'; o4U.=,. L) 6 ................................ 51 i=;~4 .......................... N 76./_',;5.'. ..................................... W (.).: ..... 4 2~ ................ .:,6/z:=' ................. .... ~=,-... ::~ N ....... ...i" :1 ...... 7,:,.'=; ....... l:"~:~ W ..'::;'l ';~74. ........... ~ · -' =' '9 ':":' /- '."' Iq '="-.' F, zi '-' '-' F, ' 3 ~ 4500 ~:,.., 17.47 3:465.47 ....... 1 21 N 7/_',. 50 W () 17 ..,,.,4 ....... .~.. -,- 17 W .-'~...0. ....................... 46.0~! ................. ~.:.-..t~.9_%1./rt .............. :~...':.'.~F,~...!.../='~' ................. ?..~ ............... !? ................. ...N_._7..,.=.L.~ 6 ?...W ...... 1,67 4~ 1,4.~: N ............................................................................... x..','.'-~' ?.'...."_ ~. :rr:._. ~ ................... ~.,:~,=,.. 4700 'q '" '-'='~'" ,.64..'. 91 H ff~ 417. £)7 N 2406..~A W 2402.37 ,:,,-,; ,.,. ':-? 1._ 1 1 ,. N 7 :-':. 19 W 0 4 o U 0 .:,7(:),.,'-' ' ::. :-~(]_. 3:653.,_-,'-' (.)' ,.,= ('.) 48 N 79, 6'? W 1 . ..' ..,'-' ~-~ 43 1. ':;; ,:.., ''"' N .-.'-' z~,:,x. '-''-' , 80 W .. __,_.-.. A '7 ,.q. ,..=;,,.,':' 4900 :.3769, 01 :3717.01 5 (').47 N 81 . :30 14 1,24 444.77 N ~,.':' :'; ._.=;', q'.. · ..' ...'-"-' W ,~.'":' ,_F, ..F, _4L. ,_,:: .,..=, .......... '--5~ C-~- .............. ,:,;~";;';:~'-'::--;- :-5'?,:, .:, .,- ............. ~-,'7,-~.~(.-f"-}'_~-'-' '-" .... 5 O' ......................... 7 N ,:,;':;::' · '":=;7'.:,, .:, :/ W 1,7~:.., .......................... 4 ..,'~"e,.,, (.); ~ .................. N .~;:~'"'u;;::6.:,._, ..........., 6 Z..i. ............................. W .~.;'" :;"'6 ,:, 1 ........, 14 5100 .-,,-, ,-,- ,-,,-,.~ -, q,-, M,-, o.-, ,~ .-, ,=,,-, ,:,o .-.,,.-, ,:,o.. ~44 49 ._ ,:, N 19 W 0 '"'=' , ,_,o. , ,'....- . _ 7o W 27(:)7 1 '? .... :, 4 ::,.: ..... -, N 2711, ' '-' . 5'='0 n '-'" '"' ' ...,4 N '-"-' 473 7F""; N '-' "" '-"-' · :, ?61 4/:, ,:, D¢)9 4/:, 49 '~' ,:,..' 10W 0 ........ · .'7:37 .=,C) W .-.7,:,..',:31 .................5~00--"~"=' ..................... 40-,-6=' "--~'--- ......... 76: ................. ,.,~74'~-';=' ............................................. · 76 4-'5 .... ......... ~,~.;5 ........................... N ~,;5:1 -. ,.~'~L) W ~.)~ ..... ,5:¥,.,,., .................. 4 ?:Zl/~' 5~' Z',I ................. ~:~i~(~.4,,~' ............................ W ~.~--"6 ~'~ ..... ~ ~ 5400 4092 N 81 =" · 56 404(i). 56 4:3 49 . · _,(.~ W · 05 5500 41 =-'~ =- ] '-' ~,~ ~,L 4106 50 48 '-"-' N 78 60 W 1 ._,70o 4237 '~'-' 79 9 , ,:,.:, 49 1 N 1 W 0 08 5800 ~.R~ .-,c 4303, ~.. ~ ~ ~ ~. l 7 . o,~ 49 11 N 78 . .... W 0 . ~'-',:,'"" ............................5..~ ...... 0~ ............... 44~0;s~' ..... ~.. 4 4~6c,'-' '-~ . 94 48 43 N 78.80 W 0.49 508.6/_-, N 3:010. '25 W 3C)05. ?2 · _,r: ~'s .:,;=;',"' (.)~ ;5; N .:,:'" O; ,:';' 4 ........ ,:,'~' 6 N ' ....... ':: d) 7 '~. 69 ~.-, -. ._.=,7 1~: N :31='- · _,~ 06 W '-'1 75 ~5._~ 1 . 54 N ~q ~'='._,":' ~,'='. 29. W :B 227 .8:3 '-"-' ) 2? :B30 566. '1 '3 N .=,~,L 7. W 1. CONI-ICO ~ I NC · ....... ~-5A M I LNE PT. ALASKA .. .... E;PERRY-SLIN WELL '.--;URVEYING COMF'ANY ANC:HORAGE ALASKA I]:OMF'LITATION DATE .JANUARY ';?, 1'~'-'= VERTIC:AL SEiZ:TION CALCLILATED ALONG CLOSLIRE F'AGE :'-': nA]'E .OF. ~--;URVE.Y. JANUARY 7, 1'- '-' =.-} o ._, BClSS GYROSIZ:OF'IF: SURVEY dOB NUMBER AK-BO-50002 KELLY BUSHING_..ELEV._. =. 52.00 FT. OF'ERATOR-SAMEC MEASI_IRE]] DEPTH TRUE SLIB-SEA COl IRSE L.O_ RoE DnG-LEG TOTAL VERT I CAL VERT I CAL I NCL I NAT I ON D I RECT I ON SEVER I TY REC:TANGLILAR F:ooRri I NATES VERT I CAI DEF'TH DEPTH DEG I'1IN DEGREES .............. D.EG/~.100 . NORTH/SOLITF. I ................. EAi--:'r 600o 4486 :E:l 4434. 'R 52 ='a' . · ,-1 4:$: N 78.80 W 0.16 ._,,_0.'74 N :3:3S:1 10 W 6100 4552 41 4500 41 4'.-.? 7 N 81 1'~ W 1 ':":' = '-?'-' :=-:4 N ':'~55 41 W · · · ,, ,_, ._, ._l ,': ..5 · ....' ~ .- .- · ..................... ~;06- ............. 4-~i";9-:7i~ .......... z~'B'~;?;]' i~-~ ................. -4'i~i ...... ~4 ........... N '-~ig--'n;~;--U- ............. 4':-i~:"i ........... 60 i .'67" N .......... 3530.44 W , ,s 1 87:3c' c' '-' ":'":' 6300 4683.47 -.,. :..',.... i 4749 '-' .=, . . W 3. :-76 63..'-. ._,.. N :3606. ,r)2. W · ",6,= ...-' 60 W 6400 4747, 46 '.-,.,...","' '~.=, .... 46 5-1 5 '='o.",'-'"" 1 '-7 W4 0'0 o'- ':',' /'.'. '", ":'":' N '-° "::'-' .........................~500"= ................... 4,=,U'~; ~' ~".. ·-.,,:.7:'52 ........................... 47._,,7~ ..........,:.7:%" ................ ..,~=-._-,. ........ .'-, :i; ...................... F2:- '~;'i:)'-~S, ;~,_,. · ~, .. ............ W ....... .,:..'E' -.4.:,.,s~-T .................. ~._,,~;~,. 4.:,:';" .................. N .... "~' 7/_-,U-' ' ..... 4..,._':< ..... W ~00 48~".-' 54 4817 · 54 5~ 19 '" · .. ":"-"q'--' '-.-,";' W .... _-, 7'2 0 W 1,, 71 571..-5,0 N .... _-, ........ :3:375.35 3449.54 .:,.:,-.' 4.4.'.? :--: 600. c") 5 :'-':676.69 3754./_-,2 3833.:31 A700 "'~"'q ._ 4 %A ,r4 75 '-"- _ ~ ...-. ,_ 1 '3 4876 13 ~ .... ,.:,. 87 N 3 '.-.'/1 '=' 3 9 · · .... ~ .~ · . .m... i .- . m~, · . · ..,. _ -" 4 ~:33.1 '-' ~.., o. ~, ,.,7..,. U W (3 ..... , ..,.:,..:,......_. N..* .... 7.6(3 W ...... ~. ~ o 6 ,_'"3 0 0 -r.."~ '::;' o~."" ~' '~'-'~-i-- ............................... .:, ~-- ''] '-' c' '= ' ' ,r~ '= ~ .-, .", -'s, ": .... , c,,,~ . ' 'o c.,, ,:~ ";, ":,. ,-, · '., ,.. ,,'-" "D, &~O0. 5041 .29. 4'28'.-.?..,:.~ ~& & ..,7&..-,~ W 1 .2~? 512, . :E:O N 40'77.7& W 4L07'-'.". /-',4 7000 50.'96,/.,'=: 5044 6,c: ~L., 37 S '17. iA W 0, 78 4'-.','3 72 N Zl.:l..=,'-' '=' .... = ..... 1 W 41'=,'':' 87 · ~ %.; i -- ~ . ~ ._1 · ....................................7..t oo--"' ................... -~"' '= ..,i._, i ........................... mm 76 ...,o'=: '-"'~,'s ..... ..................... 7~ ~'._,6: ......... ._:i .............. i ;~'i._ ...................... 77. ¢i"' w ............ c,. 1"4 ................ 475 , c)'~. "'N .................... 42'4.0'.'"i'5-'W4. 2:35 . ":'e.... 7200 ~ ..- ..... 12 51 .=, = = :g '~ '"-' ,.._,. 1"'.-' 76 ,_ .. W 7300 5-s,/,..~,, .... 72 ._,.'-"'""'"- 10.72 ..,=/':.-, 10 .=,'"' 77, 0 W ............................................7400~ ................. -~:"..,._- 17 .... o ................. 1 5,_65:5 ............ .... ;~_' 1 ........................ 56: ........... ..,7~ ......................... ._,E: 77.50 W 7500 5371 ""' '-" · · ,.-, .-] 531 '~..:, ~ 5:--: 14 S 77.1 '.~ W · _4..'~ 66 ._,071.66 58 43 :~ 77.10 W 7600 ..........................77(.)0-~ 5475. ,:,,:,"-; '~'' ............... .::, 4-...- o~" '":5'a,'"":-:;;:, ...................... :_,~;e?.. =~.) .................... ._,':" .............. 77 · 0 W R ' 5474 .,:...=. .-,..- 7,.. 00 ....-=, 526 . ='::" ~':::' . '" '-'::' 59 =' '" ._,'=' 75 . :=-: 0 W ~. .~ .-., - 7'200 5576. 13 ._,5..-4.1._, 60 14 ~ 76.60 W ............. r-_;'"--,"--'o()CIE) '-- ................ .~-,6-.... ,., ':~;~'""-.s-,'-;...,,_, .............. .,. ~'~-=a;" ,7~, ""-:s ..,,~ ;s ......................... 6() : ......... Z' k_, ~ ................ ._ J~'-' "~"/ 7 .-, ..... ,:, ::' (: .) W ' ._ 6 ~ 1. '.:'.,'0 61 11 S 77 0 W ..,67~. '~0 F, '-' ,B100 ~ "' · 0,27 4.=;/-, '-.' 4:32 '--"=' =1 N 1 W 4:'::16 6'2 ..... · · .' ~_m · · -.' 5 4 :--: 97 84 0.1 '-' 427 44 Iq 4402.." .,._._ W ,,' · · · 1, :'4. ("). 40 ()..._"-q ,.,':-' Iq 4 ..5/-,./-,.. 03 W 4. 561 . '..-T, 6 =' 4/', 4 F'~ '-~ ':"- 0 · 4':'/ :'-: 81 .., 7 N 464'i? 14 W 0 ""- _ .,:,W N 4 W 4728.84 · .....-/ :3A2 '"'- 7:'::2.55 1. :2:6 :2:4.2.14 N 4.816.24 W 481 ':;'. 72 0.7 F:: 321 · 4 :E: N 4 '.".? 00 · 2, ':"..' W 4 ::: 97 · 07 .......................................................................................................... 0 5- "':/'-' -'= 00 W 4. 9::: ':' 7 · ._ 7 :'::01 · 08 iq ,.,; o,.. · . _ 1 · ._. 0 76 · ..._ o t. '.-.'~0 hi5070.07 W 50/_-, 7.14 . ,_-, U W 0, '.', 9 '2/-. 1. (') 1 N "-~ 5 =' ='-, 8200 5721 ?0 566'~. '=,0 61~_'-~=._, o'" 76 '"" ~ 1 ._ ..,. ~,.~ W 51 ~5 ~':'. 77 ...........................................................,~o00'"'" ' ' '~..,/o~"~ ';~/; ." '''~'~ ';~ .... ................ ~'~"~' ~ '-':s~ z/. ~ '~; ...................... ~?;~ .............................................. 0 ._'~ 76'~"1'~} W 0. ,=,4'-' 74¢) oo N 524 1 ,-, f ~,~. ~ .],-'], "1, ,r;,-, m5'','-,/ ,- o4 30 5763. '~4 A2 '-' ,:, ;' W 0.42 1'" ~,~ ~ ..,. 94 - .:, 75. '"'- .= ,:, ~ c, N ._ .:,~ ~,. Y._, W 5_ 324.~5'? ~ m ,'. = ' ' ='" 5'-',]'~ 9/-, 00 N 5410. ,_, _, ~,,:,61 87 87 62 56 "' · . . .:, 75. 'q':~ c, o ~, 00 W 0, 71 i '27 N 54.1.:,'-' · -- C~ ~ .. · .................. ~.." ............................. ' .. ,~ .- ................................................................... ............. ,-, ' "~ ~;~'g~= '-'") A'~' (', 54'F~'~). . - .... ~-~:(~7 ...................... ~'~"6'?'::~;~~. . ~, .~ .......................................................................... .,,-,._,..,. o,. ~ .: .... '-'~ 7._r~. 6o w o. ~ s, ~ 7 4. ~ ~ N 2 4 W 5 4 ,., .,u ..... ~ ~ 61 ._~._'~ S 76. 0 W 1 .17 15'? , ':~.. 1 N ._ ._,,=,~,=; =''' = . 1 9. W ._~q._~,=,'"o'-'. 46 · _0 W 1 '-"" oo00 6000.62 ....... ~94:~ 62 61 o7 S 77 5' :,.:, 13'~' A9 N 5671 07 W 566~ 5':' o'~""-:.. O0 ......................... 604~' ~. U~ '~.. ...................... 5;~66 ........ U' ;~.. ................................ 61 ~:-; ................ 1 ~'~'" 7~,':". ......... 1 ? W 0.87 114 .17 N 5757~ . 10 W 5755 .74 CO N 0 C:F~ · I N C:, ....... i]-~A M I LNE PT. ~" ALAskA SPERRY-SUN WELL SURVEYING CF~MF'ANY ANCHORAGE ALA'.E;KA CC~MF'LITATION BATE ' dAN~ ~ARY '-.?, 1'-'-'= _ . ,',! ,_-, ._1 VERTICAL SECTION CALRLILATED ALONG L. LU.z, LRE F'AGE 4 DATE OF SIJRVEY dANUARY 7, 1'--,,:--:=' B O'.S.S' G Y R 0 S C: 0 F' I C:' S I.I R V E t' ,_10 B N I.I lq B E R A I<- B O- 50 ("~, 02 I<ELLY BUSHING ELEV, = 52.00 FT. OF'ERAT¢~R%F.;AMEC ........................ ]'ROE .............. ~LI'[ic."~'E~' ............. L~i~OR.'_--~E ......... C]OCIR~E ................. D'~]i~]CL]I~¢'4 ........................ 'T'OYAL MEASURED VERT I CAE VERT I RAL I NCL I NAT I ON D I RECT I ON SEVER I TY RECTANGIJLAR COF~RD I NA-FES VERT I CAL. _ '"' I :SECT I O['- DEPTH DEPTH DEPTH l"';E~-4 M I N DEGREES f]EG/1 O0 Nr;RTH/.=,uL TH EAST/WEL=;T t.:,'O00 6096. ,12 6044 .12 61 14 ':'.., 78 · ._.,U, '~ ' W 0 ,14 ?/_-,. :3('~ N ...... .'--"?=,ZL":,.., '?7 W ._.-=;::-':41 · 77 '7100 6145 81 /-,093 81 5'? 10 S 80 /:,0 W 2.:=:7 80 40 N .~i':~2::: 27 W ~-'727.23 · · - . · . · · ~ .. - · ................ ~.=,, ~? '.5 ::,(-). 1'.'.,, W l).57 6~-~ ()4 N ................... &,'O'*l-:2:'2"*i4-W .............. /:,0'1~'~' ., _ , ,,' · .,' .,:~ 9300 6247.16 6195 1/:, .'=,~ 45 ,=' ,-'r '""- o.-/ W O.'':'~' ,=, .) ~ 1 F, - z - c,,,-, .-:,~ · _L) Iq .,._ W /:.Fi':>7 47 · ._ · ~'.:,(.) .. ,_-, · o"m 94¢~0 6.,s96 · '?5 6244 '~..~ 60. ':'1 S 80.10 W 0 · '-' ' · . . ,=,o 36 81 N 8,1'-'"' · ,=,._*, 71 W 61'-"-' ,-,.-, 07 .............. ;' ~-~'"~._,¢)U ..................... 6o4...,'=" ~- · ..... 7._,~ ....... .d:,~:' .':.:,Lg:~; ..... ............................................................. 75 61 4 ._--,"~: "' e:; '~ ,...,(..). 1 ;5.. ........................... W ¢)'~...,.,6~ ' .............. .,:..:~'~1 ...... ~="~", ........... N 6';"'6'.~' ~' */i' -' IAI /-,2/-,'--,,~ .. · ..'. 'P 6 0 C)6 3 9 4. (..*) ,:,'-' /.,_ ...,':' _~ ~'::'. n._::: 61 7 .':' ...... 7 ,.-."1.6 '?. W 0.4 4 6 . ,"_-, 0 N /.., ]--: .,=.~ !~ . ,-.-"1 .... 1 W 6 ]:: 5 .=, . ._ ...,.=, =' '.-.-,' 700 6442.72 /:,~'-'".':,,¢~*. 72/:, 0 40 S 79. ,:,'-'F) W 0 .4. 6 ~.:'*. 'F.:' 5 S,/_-, 4- 4-1 .8'.-.-.' W 6 441 .68 . . '" "'-'¢, , ~ _. _ 66 '**='~00 ~-,53'?, 75 64,:,7, 75 6¢'J 44 L~, ,=, .J i b'¢ W 0 .. 7 :=:9.4/-, S 6614.0'***-¢ W 14, 1 ~ ~ -'"¢1 '.~,-',, '-" '-'J(') '-"- · ._ .. _. _ , . . ,:, ? N 1 · ]"*' !=~ 4 0'!~ '.::; 669'.T~ /:,!5 N 6/-, 99. o6'" 10000 6~_,~.. /-_,~:'47 '-'" ._-~ ? 5'~ 4:-4 ...... (..:, _ · · _ . . ....................I. ¢} 10¢)2"= ........ = 664U.= ~.~"'=" 65oo.:=:~=~--"=~':~,2,..' ................ ~.,o~';=: ....... ]=:;:~:~.~ ............... :-=-"~ u, 1 ............... 1 ~:~.. ......................... 14 1...,~.=*~" .......... 67 .... '2' -~' .... .=,~=:67,=,4.'=J ..... ~:, .:"-; {=) 14 67o4:64 -.-, ] '~,, -. ,-,.-, ._ (.) luzOt 66~4 '-"- ....... o.~,, ,"_,642,8'.-'.,' 5/_.-, ~=, z_-,,["~ W 2 P';' 7'.-.-,' /_-,7 S /_.,,:--:/:,7. F, 5 W 6868. · m '--' "" -'- ._,4 ..'5 c: ,--, '"' '-"=' ,6,'747, ':."-'4 ?, 10300 6751 :.d:Z 66'?..'9 '=:'~ = '"" ' o4 '-" - o L} W ~ 1 ,:,,., · 70 S '.."4 W 6 77 ........................1 ()4t.)O=": ................... 681B .......................................... 1 · 66 67...-~E:-';'~?.. · ................. 66 ....,~"-'=';" .................... 5 "7:---;=;"'-7--'=o oo · roll ............................... W ;5 .... ........ 4/_"L ....... '~';":"' '=2' '~'~' ..... "b:.., .................... ="' ;7 ¢.) .':5';L$'.. ........, 1 ,_,'~5 ........................... W 7.('):"t';~-' .. ....... · ] - - _-, - ,-,.~.-., ~_ ,.~ r::. ,". ,=,,.~ . ' ,*~, ,.-, ,."!~' ,=. . ' . ,_-,,", - - 105oo 6~74, 55 6,_~... ,.,,., 4 .. ._,6 ._-, ...... 6o W ~., ~ ........ ,, 41 .... 71 u/: ........ 14 ? I uT. 4 / ,%. '"'" ,-, =~ '~'-*-) W 1 4'-' '~5 2::: '.--: '71 :-: 2 ':'3 10~00 6~3..'P, 74 /:,~o7, 74 4,_°, 40 N '-"'... ~..- . ,_, ..._. .. _ . 71 14 71 ,., ,. **.-"~. ...................1070C!::'-- .......... = ...................................... 7006 · o~2~ .......................... 6 ~'~.. 54 ............ · 7;o6 ................................................... 47 4/:, : ................... N ,:,,=,?';"'=~ ......... · (-)'- .................................. ~ 1 · ..',,=,:=~2-*; ............................. F~.-*",'"'/......:,... .... (=)C.', ............ =' ::'"~ 7 ..' ..,7 ........... · .**.6:3 ....................................... 14 7-'*..,'=:"'=7. Ls.:~- = '~ r.,'L) '-"::' ':'7:*-'::": ""'-' 10800 707.=,, 75 7021 75 47 '"'-' ~.,:, N :--:7. 0 N 0 7?,, "** . ..... · · ..: ......... :l 0/:, 14 7..:,.:,:l 7 {-~,.-, Y · '-' .... ,=,C N '-" W 0 "'-' · ,=, (.) · =y,-, ,=, = ..... '? 404 (') '=' 1'"'' W 74(2~4 5'7 L)YL)¢) 714i 96 "-'" .-,6 4/:, '-") '-'/ '-'/ 42 '~ ................................................................................................... 7~1U. ol 715,=,. ol 46, ..-7 ......... · ..... ,.,. -'.~ <,-'. -~ :: .= .... IEI/:,. ' ~ '-' '='.q ?'"-i 4 '--,, ~., d l 1100 7279· 70 7227,70 46 27 N ~¢].. 14 0 O0 77 76 '::' 7.'4m0·'_'._ W .... . · · .~.m --.~ -- 0. · '~ '-'-~ 59 4/:, '-' '7/.',211 '=' 7 =,.~ 1 54 ! 1200 7048 59 7.~ F6, 27 N ,:,6 .=~' "" / ''~' · . (.) N 0 O0 73 "'"' · ..~.--", .~, W HCIRIZONTAL DIoFLAt...EMENT = 7:..",..'1 ._4 FEET Al' .=,UUTH ,-,o · ,-.- DEG· 26 M:I:N NE:--':'F AT I"ID = 112(30 FHE L. ALcULATIuN FRuL. EDUREc, ARE BAoED uN THE LIoE OF FHREE DIMEN.~IUNAL RADILo uI- L. URVAIURE C:ONOCO, INC. C-5A MILNE PT. ALASKA ~-~F'ERRY-SUN WELL '.s;URVEYING COMPANY F'AGE 5 ANE:HORAGE ALA'._::KA i]ATE...OE__SLIRVEY_ _,_IANUA~Y...7~ 1'.T-/85 . COMPLITATION DATE JAN~JARY' '~, 1'.-.-'85 JOB NUMBER AK-BO-50002 KELLY BU'.E;H I NG ELEV. __-_.__ .=,'--' ........ - ._...00 FT. ............................................................................. OPERATOR-SAMEC F' (!._L A..T E [.'..V. A L-_.L.!F__s._..FJ;LR__.._.E _v. (_.N_ .... ! E_ T_._0 E.8 Su R E n._ E..P?._H TRUE SUB-SEA TATAL MEASURED VER T I CAL VER T I C:AL ....... R.._E:C:.T'_ANj3L!LAR_ .... C_C!f-_!RD I._..N. A ~[E.S .... MI]fi TV.]'~ ................ VER T I.C:AL ......... DEISYH .................... DEF'TH ...................... DEF'TH N JRTH/c.,UUTH EAF;T/WEST DIFFERENL-:E C:ORREF:T IFIN 0 0.0 (:) - 5'2.0 0 (:). 0 0 0.0 (") (:). 0 0 ................................................................................ 1000 '-~ .'/,_-, ." '-' 68 ?~46./:,:El :i. 6. i 1 N ,'-o.'-' '--~;'' ~ ,_.:,.~';'-':; .... W ............... ~ ·" ::"-c,z' 1 ·~.,:.'::'-, 20(]0 1 ' '"":' '-'q'-' '-'/' .9~,. 74 1871.74 70.65 N 74 . ._',~.. 17 W 76. z'-, . 3000 2644.2~ 25~2. ~-.-,'~'= 143 .10 N 1060. '.~/:_--: W ..................... 35.~.~. ..... 7~], 279~ .......... 4.':.~ U;~ z..6.11 N I · . 41 ...... )¢]0 .-,z07. ~: c, 1 ~ ._,. o/,...,~ W 7'..~2. '.-.? 1 43'? 16 4._,~. 04 N .- ........ · ~000_ o~,o~..',c,.-,.-.,, 67 378£) · 67 =.S '?/- ':'F, 64 W 11/-',7. ~,._,'~":' :'":74. .43 6000 4486 '~ 1 443:4 °1 .~:::A 74 N '-"-"-' · _',._', o I 1 A W 1513 19 c: 4 .~i. ':~/' # I.i __ . '7(]-O'i:i ............... ~(.i~-' "~.. 6. .......... 6,_-,;'~ ........... ~. U44.' .............. 6o'5 ............. 4 k57~,-....:,. ..... 7,.~r N 41,_,e;s,:, '""',s-~, ,:,, W ........ i"!~;(])?J:-~-iz:~- 3?,0, 1 4; ....00 W 2374. A 2 :2'-.':'/ c, 01 ' ,---, ,'.),:: 80(')0 5625 '~'-" 557:_--: · :qm '-" u,:, N 4.71 . .~. ~(.)..:, 87 527~ '"/ ....... ,.:.4.,.: W '~C)00 6C)'~6.12 6C)44, 12 '~/-, 30 N '"-"' '-' '~7 "" ' "', , .......................... '-"'~'--""--- ;s',=-"';, ......................... ;s .......... :;;~,= ...................................... ~_ ......... :';.: .... ,---: ................. ,5c/ - -=- .................... :':," . :- =:' :)'/J,' ..... ::' 1 (.)UO(.) 65o './. ,:,9 65o7. o ;~ ..,4. (.) .'./ o 6/_-,; .. ,/.:,._, W ..',41 ~.). 61. ._,(. _. 7._, -' ':: ':'":' 19 '-' 1100('~ 7210. ~1 7158· ,_ 1 ,-,~- · . .:, 74.7/'-,_ .47 W ~,' ,:,"'-"-'"?:. , 1 ':~.. 378 .58 1 I '", (') A '7'? ZL ':' ~'-_-/ '"'""-') / ~"':1 -"':' ":-"--' ' ':' '? ~ '-' ~ ~ I" ~ ~ '"I'I ~ ~ .............. ,. ~.~...':_ .';: ................. .,..':..z.i.':'._"_~ '- .......... /z..-. c,. ,., .-. / ......... _, .(.?~ ~......~..:_,__~ ...................... .? .:..:.._~. 4 ]. 62 '--.":' · · ( L.:, F1F L. LIRVA FL RE METHOD ]'HE CALCLII_ATION PROCEDLIRES ARE BASED ON THE LISE OF THREE DIMENSIONAL RAF._~I I,- .... I, . · _-,F ERRY-.=,I_ N WELL '.:;I IRVEY I NG COMF'ANY F'AF~E /-, ANCHI]RAGE ALASKA I-:ONOC:O, INC. DATE OF '.--;LIRVEY ,_IANUARY 7., l'P85 -. L.-.- A ....... ~:(iMIb, l~l;F ~'T'-:[ GN 'DA TE- M ILNE PT. dANUARY .':.7, 1985 dOB NUMBER AK-Bn-50002 ALASKA KELLY BUS;FlING ELEV, = 52,0¢) FT. ......................................................................................................................................................................................................Ui~-" ERATUR-~.,AME' -" - ' "'-' '~'" "(':_. I NTERF'OLATED VALI_IE:~ FOR EVEN 1¢)¢) FEET OF oLB-._EA TiEF'TFi TRLIE SUB-SEA TF;TAL MEASURED VERT I CAL VERT I CAL REC]'ANGULAR ROF~RD I NATES MD-TVD VERT I CAL [ EF TH DEPTH ............... -DEFq'H 0 0. (') 0 -,...-'=' '-'. 0 0 0 .0 0 0 . (')tS) 0 .0 0 ..........................· .. ~,-:?.,' .. .............. -~ ._ ..:'ir"". [')"i _ C ............................. ~i . '-". b'O. .................................... . i'i . -~ "i-'"i.:~:-~ . ._, ..................... i5' . ~-'(~ . ._ .-=,-" E 0' ~' 0 t) . ................................... 0 .-0 ('i 152 1 '='''' 00 100.00 O......,.. '.:; . . ..., .... =:'-' _ C) 82 E C) 0,¢) 0.00 '~ '-'.'~'~ O0 200.00 (") 50 S 1 44 E 0.(")1 0 O0 352 ....'~ ._, ..- = ':' L ................................... 00 ..:.'" u' u' : 00 q ....... :"!~ 5---N- ................ 1",-'5'4' E ............. 'h'. ,n 'i. ............................ ~"~ ', "~'i i':~.. 452 ,.....' .*.=,'-' 00 400.00 1 .22 N 1 .57 E O. cz.I,'-' ('). O0 ... . (. ..,5 ..'- 552 O0 ='' · .., U u · 00 '-' · .:,. 16 N O. ':.,',0 E ,r'~ 04 ,¢). ')'-' ............. Z:-,'B-:.-'.- ................... S'~2'700 600. O0 5.u.=,'"' N 0.17 E 0.06 0. ,r.~ ...:'-, · , . '- ~.~ .-,,' W O. 12 ,r'~. 06 75:2 752 () O, 7,r'~'O 00 7 70 N .z. ' '- ._......- ,......' 00 :1.0.90 N 7,.~,A W . , ,= O0. O0 _ _ ,F). :3:2: 0 21 .......................... ~. ~ ~ ............ D. ~ 2-"-'-i;i't'i.. ................... ;~. i';ii'i'7-5.. . ~.i .............................. 14,'4.'~'"'" ~ .............................. :1"?--'" :,'.1. 0 W 0 :-' ":' o · (:~ .' ".....,'"~; ~- 1054 1052 · O0 1000, O0 17 · 97 1"4 :'::2 · 11 W .~.":' 04 1. 15 1156 1152 · O0 11 O0 · O0 21· 42 N ....,..:-,='-' . ('='-J,.:, W 4 . .."'"'",=, ~'". 24 1260 1252.00 1'~-' ] o=; 11 N '?] · ."t)(.. 0 0 '::P 4 5 W ,::, (.)._ :2:7 7 a2,,... · 13/.-.5 1 "' ='" ~ ........ 5 - o ~, .'-. 00 1 ~ 00.00 ~'.-./· 41 N 11 ... ~' 72 W 1:2: . z.".z · 1 ~: 4., ..'. 00 1400.00 '-"-' "'-' 1471 1 ='~ o.:,. ?o N 149.57 W 1'?.'.:.)1 6.68 ~=,=/"-';~'.%'--'~i ....................... ~"',~'~ ...... .:; ~2-"' ~ ........................... .';; ;=;' "':~;~; ,~,' ~"~':'~ 5._, ..'- 00 I 00 1580 i ='" F,'" · ._"|,_-.:. 6,.,..' O0 1600.00 44 37 N .,:.._,/.:: .... , .. 1690 i = '~ . '-.'":' - . .=i-, = 14 "" .:,'" ~ ''~ 9 '.;' 4 · " '~.' 4 · ¢'' I~ ,_ ,., 1 17._, .." ~'~ 0 ! 700 00 ._'5._-,. '-"-'" 49.76 . . . .:,~. N """ ,_-,._, 14 .t .1. 4-4 SF'ERRY-SLIN WELL .:.LRVEYINL, COMF'ANY PAGE 7 ANCHORAGE ALASKA CONOC:O, I NC:. . ...............DATE_.~FIF_.'--;I_I~V_E¥_,_IANI_IARY.__7, 1'.~::-:5 L..-._ A C:OMF'UTAT T ON [~ATE M ILNE PT. JANLIARY '.-.-~, 17/85 JOB NLIMBER AK-BO-50002 ALASKA KELLY BUSHING.ELE~V. = 52.00 FT. OF'ERATOR-SAMEC I '-' C'l '" I NTERF'I3LATED VALLE..~ FOR EVEN 1OF) FEET FIF ~,LB-._~EA DEF'TH ]'RUE SUB-SEA TOTAL MEASLIRED VERT I CAL VERT I C:AL REIZ:TANGLILAR COnRFi I NAI'ES MD-TVD VERT_!.CA L ......................................... i~ .... ~iEF;~H ....................... DEP-TH ............ DE-F;YH ............ ~[fi~7~ILI'];SE-,LiYFI .......... ~--~s:--f-/-~Y ..... r-l-I ~ERENc:E- CORRECT I ON 1 '? 15 1 :~_ 52· 00 15:00. (:) (:) 6:3 .1 :~_ N :33 :E: .96 W /"~..-"-' · '~.. 1 :L 4. .l'=._, '2033 1 ~;~....-" ..... UO= ...................... 1 ;5 =:"-- '=.. UU. 00' 7:3 67 N 400¢]=._,- W ':: 1 ...,= 7:l 7.66 · - · · i. · 2155 '~'"~'--~ '-' ')' ' '~4 ~ u,.,~ 00 45 N W 103 "' -=' · - ¢. g(.~ 00 '.-' 1 78 .~.zo,., .z.~,.,..'. 00 2100 . O0 94 .37 N ,. 4..'. · -' 40~ :Z..' 52 · UU ~'.."L)U. O0 1UZ · b:6 N 6~.'_-:. u'.-/ W 156.7:3 25:. 5:3 .,_~'.~' M 42~,~'~' 2686 '-'~='--' p · .'- ~._, ..'- 00 24F)(]. 00 I I° 74 N _,15 1'7 W ""'-' · 3013 ...-65...-. O0 2/:,00. O0 ~ 44.28 N 1072 · 0/:, N ?,A .... ~ . ~5':,,., /,9.. · 73 :3 ~ 95 ~,~ .. ,'~. ~.~'"' 00 27 F} 0 · 00 ~ 64 41 N .1....- ~c."-.'o · o,:, W 44:.:,' 27 ':' 1 /-,9 - .~..i i.I · ., . · i.i :3559 "*'-'='"' .,.' .-.,.-,..'-, 00 '.-"'".-,'¢]0. ('}0 '-~':'1 01 N ' ~-'-' ?;=" 7'.-.-~ ""-' 1 ,., .-'- 1 46 W 607...._, . .:,.:, · ,~., · ~ ,a:,,. ,,~,,, · · 37:3:-/ :]:052. O0 '-' ')' ' .:,coo. O0 ..._,.,:.":':'":', 24 N 1667, 7:3 N /:,87.49 7'~. 9Zl. · 'q _.c:,i3~ .............. $i't' ~'-" ~'i~q ................. ~-i 0~£'-"- ~.i0 .................... .,:.c,U, ~U'" '~'' :'-"--:~= .................. N l~U:l. ,F';"; ................................................................................................ 77 W ....... ~'5'~-:"0'~; ....... 6'~ 5'-, · _ .. -., ,, ,,.: ,~..,., .".' · '-..--...- Y .. · 4074 '2,252, O0 :'::2F}F)_ .., O0 :309 . ._,=?,'-':' N :1. '~2'.-] ,/:,6 14 5"..'.."-':'., ....., ¢:)4 /:,4, ':.-)7 42:35 ..'3":-' ="",., ,., ,', 00 3300· O0 ,.,.':,..]-z._ _ , ._'53 N 2r).=,3. _ , ...,'=-'-'~.~ W '-'"'"' ,:,,:, .:,. 74 /:, 1,70 ..........................4..~!~ ;$'~:: .-, 4555 ._,,.,._, ... ""=' ="-'. CiO 3500 ,00 ._.'~94 .47 N ~' -':' ":":;' /-.. ..... :L ._'--: W 100:3, 2 :'::. /_-, F) , 1. 2 4714 ..:,o.., .'-'='" '=''' . 00 :':: 6 F) (") 00 419 '"~'-.-,' N 24 ! 7 :"" 59.2'i.:,' ................................................................................................................................................................................................. :_.:-',..F~ .. W 1 (:)/:, 2 .=;,'-':'. - . . · . .... , ............................................ "._:~. ff.:;._ ................................................................................................................. ........................................................................... SF'ERRY'.L::UIq WELL SURVEYIN~.~'' I::i'OMF'ANY ..................... PAGE :3 ANCHnRAGE ALASKA CONOCO, INC' DATE OF '.E;URVEY dANUARY 7, 19:E:5 C-5A COMPUTATION DATE M I LNE PT. dANLIARY 9,~" 9'-'~. ,:,._, ,_lOB NLIMBER ___._A.L..AS.!!~_.A- KELLY BU'.E:HING ELEV. = 52.00 FT. AF'ERA INTERPOLATED VALLE.:, FOR EVEN 100 FEET OF L::UB-SEA DEP]'H TRLIE SUB-SEA TOTAL MEASURED VERT I CAL VERT I CAL RECTANGLILAR C:00RD I NATE'S MD-TVD VERT I CAL ~-~"P¥'H ............... D~;'~H .................]~iE F;-'FH ............. N~i-~:rH'}'SOUTH EAST/WEST DIFFERENCE L. uRRE_. FION R '-, "" ='-' 62 W 1 121 1 A M':' 4,_ 7~:, o7._,..'. 00 3700 00 441 61 N "~='"'" · ....5::.-..: . · ,~..J._'~ ,_',. 5185 ~952.00 39A0 00 472 '~"~ N ~77:- 49 W ].'~'"~':' 41 533- ~' 4052.00 4000.00 ~,~' '" ..... 'R '~ ~ '~ N 289 1. (.)' ._, = W l~C' ........ g/- . 'R ':' ._M ~'~'. 97 = .~ c, .? -- ]'::':~(') 29 M":' ~,/_,4~ 4~5~. 00 42r)0.. 00 5~'~. 03 N 3116 . ~..'~'/-_, W . ._ .... . ..~ 4 o U .) 00 5 ~ (') 81 N W 14. 4'-' 5794 A~_~'R ~ '~, ...... 00 '-' ' (' . .:,'-' z'-' z ''"' '~;.._,: ._,: ~:.. 97 .-,: 2 ~.) ,:,"" 5~47 4452.00 4400.00 57:3.00 N 3342.01 W 1 ~'~--~ ..... 09 ...'~c'~. 11 . ;~._, W 1547 '"'"' 60~9 4552.00 4500 00 593.. 77 N 3454. "'= . · ~ '-, ......... ' '-'~ "'5 ~,':~ Az~, 1 465z. O0 4600. UO 6Uz. ,:,.:, N ~,..: ...~ ._, W 1..,~'-'"';- ;-. 81 ..P]'~'~. 4:3 ~'" :3688 6407 47~ z. 00 4700.00 .-,~ "' =;' .-, . 65 N . 17 W 1 ~ ...... ~ · .... , . 41 4oC0 00 ~7/-,.00 N 1 86 W 171o. A_ 570 4852.00 '" '~ ' . ~ _ ~,'=' ~,':' o. = '" 6:3 6:3 .41 6741 '=~5'-' ~45 ._ 7 N i W 17,:,;. '70 ":~ 4; .. ~ 0C) 4900 00 ~] '-' '~ = "~'-' '" ':~ 6~ 1 .... ,uS~. (.)C) 5000. UC) ~,0... C).., N 4t) ..... z :, W ~, 15z. 00 5100.00 474 '- ~ ;- ,,:,. 43 z..:, 7100 = '~ . ;~._~ N 424 c').. 50 W 1 ':' z, ,-, ,_,':' 1 . "'"" 4.:,,:,6 66 W 2~')2~]. 74 '-'r ,:, .) :31 ~'"~"~ ~252 00 52(]0 00 441 04 N '-"-' 7654 ..,45~. 00 5400.00 .:, 71.14 Iq 4694.66 W 22c")2 6:3 91.4/-, ,-, = ~ ~ = ~'~ '" '" ~ = ") (') ") (" '-' '-' ~ '-"~ '-' = '- ,~ ~, z ._,.., o ~. ,.~ ~.~ ._, ~,,... ~..~ ~, c, z. ~; N 4 c,..., ;~. 4 U W ~ ~;; . 4.:, . .............. ~ CONOCO~ INC. C'-5A C:OMPUTATION DATE MILNE PT. JANUARY '.~, 1'F~85 ALASKA ' ~;F;ERRY'SON'-'WELL SI_IRVEYING CF]Mi~;ANy ANC:HORAF~E ALASKA .............. DATE FiF .=,LRVEY JANLIARY 7, F'AGE '? 1985 dOB I',IUMBER AK-BO-50002 .... P-'. ..... . 52 00 FT ........... KELLY BL.=,HING ELE_V.. = ..... OF'ERATOR-SAMEC I NTERF'OLATED VALUE:E; FOR EVEN 100 FEET OF .SLIB-SEA DEF'I'H TRLIE SUB-SEA TOTAL MEASURED VERT I CAL VERT I CAL RECTANGLILAR C:OORD I NATES MD-TVD VERT I CAL --'DC:_ ¢"¢R ........................ ]~iEi~TI.:.I ................... DI~'TH .... FIOR-Y'R-/7_~ o u T]-:I .......... E~i:i]':/WEST D I FFERENE:E CORRECT I ON ,_ 054 00 .=, 600.0 (} 2 :=:':,'. '-"" .... =,,=, N .=,¢):'::1 :31 W '::.'402, .~7 10:'::. 14 .,.., _ ....,~..im ~ . ~ · '~'-' A ='-' ~'-' 0 0 5 7 0 0.0 0 ...4,_,'-' o 1 '.;' hi ~'--' 0 c~ = .- · _,7 W ~511 1:=: 10:3 61 ,='~,~ F,R.:,'s, 00 .~,E:O(') ....... 00 201 '"'~'=,._* N ~:'~'-.74 31 W 2626. :31 11 ._ ,-, ,- ~=:,.-,o 36 W 11 o6 76 ="q'.~'" 00 5'200. O0 .1. ='" -,'" "- · .,.=, ·/= -': N 2744.70 · .#l ,, ,_ ." ii o...., m_! .~,,. '-"~" '-' ' =">- .......... ' - ' = ' '"'"= ,:, .. 0,:, 60.-' z. (J 0 6 (.) 00. L) 0 I 1 z. 7 (J N .-, 7/', 4 · I t) W ... ,-,., 6. 1., . '.~11'-' .~ 61 ?,'" 00 6100 00 7:_--:. 7{2) N =:o.-:,,-, ~ 1 W 2':.'~A(') 09 10:'-':. ')4 · .,..."mi · ._ . _ ~ # . ,~! .,- ,s..! m"m · 9:30'2 '-' =''' 6.~ o .) 00 5 (') 11 N 6106, 42 W '27 /-', ~ o ~ 00 '" ' (' '-'0"=-' · .S~ k.....my # i . m ii ii ........... ;~ ~ :~'~.... 1 ~" .................. 6~..:, ..,.,::. 7~F.-=' '-'(.) (J ................ ~:~-~..:, Q'~=L) ...., C)=Fi~.) 19. , .'::'" 5 N 6 ..' ,_-,C), :-':/_','~' '-'' W,.:,"'1 ~0 , '.:.Y :~ 1 C)~"'.~:,, ._,'c' -",~:. '2718 A452 00 6400 oO 11 87 S A45:~. 14 W ':'":'AY-. ' ........... ,: _ ~. 'F?4 106.0 i '.-.7925 6552, 00 65,0C). 00 43.1:=-: S /: '-"=' "' 6 =,,:, ..,,/_-, ._-, W 3 :':: 7:3. ........... i-0-1,'~'i .......... 6~-5 ~""-'0 i:i .............. ~"~i5 i:i';-¢i"¢i.. :z . ,.'"' "'.=,...._,;5'"']=:.=, .................. o Z ,. ,~(-,., .....-.'. "'::;'~--',:,... -, ~ ................ :-:: 4 103('10 A752 00 /_-,700 00 ,_,'="=',_, 72,., '=' /-,'~4'-.?. 4:-':_. . W .':, ~ z;. ,=, '-' ="~ .~._,. 2'.'.' S 7 0:=: 0 0 5 W I .. 10464 /_-,o._,~: 00 R")' ':'/- 2 6,_ C (.) 00 "= # ~ .i.. . _ . · ....m 1 .... L)6,~ ....... 1 ~o ................ 6 C~:-':" -"='.. ,.,..'. L)L) ~- .................. 655'.. (j(j.:'"~ ...... L)O": ....................... ;~'~; ._,. ......... 14 c:,;'": .................. 71 '~;.. ............/.',,/-',._,~: W 10767 7052 00 70C)0 00 '-?1 62 '=' 7..:,'-'(J7 ._"4,7 W :37 1 =' ii ii , # ....m i 'J # ~ 0 '~ ! 4. 7 _l .~]'~, 0 0 7 _l 0 0 0 0 '-' ~ '=' 'u' '=' ~ ..- . 7414.65 W :_'-:7/_-,2. .............................11(.)5..'~:' ~" 't_"i ...................... 7... ~,~. ou:~ e':''; ..... ':' '~ .......................... 7 ..- (JO. (Jo;";"~ ''=~ ...... =' '~ ~'7;';~;"" '~.~,4 ....... .~'=' ............ :'7.,1 ~'" ' '~::¢ ............ 7.,'~' W .-,,-,( )7 .'" '~' ' 11200 ~'~, ~'-' 5'~ ~ '~- '-~ ~- ~-"- 7:3 '-'"' q .=,.=, 7~ 1 1 · ,, · ... ,,,~ .", (.5 ..I 1 05 3:2 30 '.-75 57 82 7'2 45. :20 41 43.62 106. '.-76.27 78. /.':, 4.65 ~"' ,_1 ,% # 4'2.2.=.; 4/_-,. 7'7 THE CALCIJLATION F'ROF:EDIIRES I'"- _ _ .I=,E A LINEAR INI~ERF'OLATioN BETWEEN THE NEAREST 20 FOOT MD (FROM RAI]IUS OF CLIRVATLIRE)F"FJINT.=,¢' ' :::;F'ERRY-SLIN WELL '.--;URVEY 1' NE~'' ~":,:"~MF'AIqY ANCHORAGE ALASKA F:ONO C;], I N C. c-~A i~.i~MF;ilT AT I 0N [lATE M I LNE PT. JANUARY '.-.-', 1985 ALASKA F'AGE 10 '-'1' 1'~:=-:5 DATE F~F z, L RVEY JANUARY 7, JOB NUMBER AK-BO-5¢)¢)02 KELLY BUSHING ELEV. = 52.00 FT. INTERF'OLATED VALLE.=, FOR SF'ECIAL .=,URVEY 'F ' F JIN I".=, ]'RUE MEASURED VERT I CAL DEPTH BEF'TH SUB-L:;EA TOTAL VERT I CAL RECTANGULAR E:F~F~RD INA T E'.--; -- I i-. - ,'- ~-. ' .......... DEPTH NURTH/~.,UI_ITH EA..-,T/WE.:, F MARl<ER 4760 ,:,,"_-,,=, (.'-' '-' ').._.:;._,":' :3628 . .....:;._,'--' 426 .44 N z. 4 ._ .,::.. :':: 0 WI-::: A 4,_-,..., t.)'-"';t-"-" ................ ._:q-"b-;7.-4 ....... 7 ?4 _ .......... ....,/_-'~' ':';'"-';~ 7.... 76 4902 3770.27 371 :-':. 27 44._'=;,. 00 N 256,[:). 75 W I.:. _: 40'~'~ '-"=: ~ ,~ .:i, '"/: .. ,-,:, ..:,,.. · ~. .... 57 3766 ._ 7 453 10 N .,::. :..", 1 '"=,. :'-':7 W K ................. .~, i'~ ;~: ~.; ............... :'"' iq ~' 6 .... ,F6- ............. ,,q,5 i]-'~ ..... · -- ~- '--" '..~' ~.. '-- '-.' n J. '--~ '..~' *--' . J. · J. '", 'T ..' ! · i.~., L", ! M ~ f..~' f...~ ~.~, ~.~ 'T V"~ I.. [~1 5¢)74 '-'"' ¢'"' 'u"-"="=' '-'/' 5166 393.~. . · 4 ! 3:;:87.41 470.19. N 2761 . ,_,'='/-_, W MA 5340 4058. '-'"' . .~ ,:, 4'.-](') ¢)0 N :.4,,.-, 4006 '--,"-' ..... z ...... =,. '?6W MI.]: 5508 4163.7'~ 4111 7'....2 509 '"'= · , ,=,._, N 3016.84 W NA 5548 4170.21 4138.21 515.78 N 3046.27 W NB 5580 4211.19 4159.19 520.2? N 3070.01W NC 5610 4230.84 4178.84 524.50 N 3092.29 W ND 5627 4241.98 4189.98 526.88 N 3104.91W NE 5692 4284.59 4232.59 536.¢)5 N 3153.13 W NF 5741 4316.71 4264.71 542.98 N 3189.47 W OA ~,,_~6o 4396 :'"' · ._,.:, 42:44 53 56('). 73 N ""-"-" · .:, .z. ,_-', (.) . ("):2 W OB ' '='-' 5997 '-"-' 87..~¢ .:,,~z~ ..... ~ -,-. ,:,~ ,::..4 1 .. 4. N .=;/_-,/-,.=;-,. ]"' F - ' .... t.,:, W LJWER K UNC ....... . (.~ . · o,_/~, 603/.,. 59 5 yo4 · ~'- . .., ri 118, 47 N 57:36.48 W Idl<R 1 "-.¢ ...................................................................................... S F'E RR~-- S]_i~ -'~ L L--' :-]~Ll~O'~ ~'Z-~';:~ '-'Ci 0 M F' A N ~; ...................................................................... F:AGE ANCHORAGE ALASKA _.~_--:J-'.~N.~?c_c!..? ! .N..~___'!_. DA'FE__OE._ :~;I. IRVE.Y_._,.i_ANLIAR_Y.. 7_~ _ 1_~:35 C-SA CAMPUTATION DATE - M ILNE PT. ,JANUARY ~, ~." '-'R=:,~.._, dOB NUMBER AI<-BO-5A002 ALA,_KA 11 ..... i'- . 5 OA. ............................................................. I<ELLY BLbHING.ELEV ..... --_ ...... 2,.. FT, OPERATOR-SAMEC INTERPOLATED VALUES FOR SPEC!_.A_.L_~_:!..!..R__V.E__Y___F]___-!_!_N__T:'._--.L_ ................. TRUE SUB-SEA TOTAL MEASLIREK~ VERT I CAL VERT I CAL REL. TANh' -' ]ULAR F:OORD_ I NATEs--: DEPTH DEPTH DEPTH NORTH/SOLITH EAST/WEST MARKER 10790 10804 10875 10895 1 O'P 8 ?. 11000 11' '" 01 .... 200 7067.00 7015.00 'PO. 76 S 7:::23.70 W T/MK-1 7076 46 7024 46 'PO '-"~ . . .~..- S 7334.00 W B/MK-1 7124.75 7072 75 87 44 ':' -"-"-'~. ..... /._',,=,._ S/7 W L-8 7138.52 7086 .=,'"' ,AA 63 '-' ......... _~ 7400 .4/.', W L-'P 7 .-, ,-,' .~.;---:-": .:: .......... 9J '~.-'~ ..... .s:~ ...................... :5:~:,"'-"?:':K-,-_;: ........... -' ...... ..'._, .~.._,-...'.:, ,;.,-.. .... . ._, .~,-,- .... .-".-, T/LK-I , 7210. ,_,':'1 71 ~':: '-] '::":' . ' . '-'11 ' i ' .... ~1 ~--.19 S 7476 47 W .:,_RVEY KEFTH 7219 0:-': 7167 ~'~A ,_1 65 ._, ...... ,-,,= .... 16 W F'BTD 7'~"'-'-' 5'.:? 72,';76 ?,c~ ~-~c,.. .,... 73,""~3 ,. 7621.18 W TD , $CRLE :- 1 ~NCH TO ~000.00 / ~000.0 MILNE PT. CONOCO,. 1NC. C-5R ]RNURRT 7, 1985 RK-BO..-50002 ' K ............. . ..... :- 'i'I. .... _~.~TZ'~ . ' '~ . .'. ''Ir ~ .'" ----.,~ .... 1---~ - MOP, I Z 0 N l-' rq L PP~OJECT,, I ON' , L-iooo. oo 0.00 2000.00 ~OOO. O0 6030.0o 8000.00 r ,12 4EL 59 5CflLE :- t INCH 70 20001.00 / 2000.0 C-5q - : JRNUR~ ?. RK-BO-50C02 VERTICRf~ SECTiI~N IS 7621.54 2000. oo. ~obo. oo I 6000. O0 11200 8obo. oo VERT~cRL- PROJECT ~ oN . 1985 " , 't , r . (' Suggested form to be inserte':= !n each "Active" well folder to check for timely compliance with our regulations. ~ 11 f1 C f) -111 ~ &-' ~diC-r5/1 0 ERATOR, WELL N E AND NU ER . Reports and Materials to be received by: Date Required Date Received Remarks Completion Report -~~ -? :J.--- JIg-97 ?ðv~ Samples 0 Mud Log ---I () ... Core Chips \ ~ . - "'. Core Description ", "~-"'-""'" """',.".::;=....- ...-I' ð " ..../ Registered Survey Plat 0 - ~ 5--- i:Ji . _.." '.' I' Inclination Survey c7 0' iro- Directional Survey 5_.. J ~ J - ç.'~ ..;' 0< "-t U, -J l ~ " ... ót" . "p Drill Stem Test Reports - Production Test Reports - ðf. (]K e~ ~ I~ c;j} -......., Digitized Data /" e..s 1- (.);) - ':. ,--' ðk ALASKA ¢-". AND GAS CONSERVATION CC' 'MISSION MONTHLY REPORT DRILLING AND WORixOVER OPERATIONS' 1. Drilling well Workover operation [] Name of operator Conoco Inc. 3. Address 3201 C Street, Suite 200, Anchorage, AK 99503 4. Location of Well at surface 543'FSL, 2242' FEL, Section 10, T13N, R1OE, U.M. 5. Elevation in feet ¢indk~ate K.B, DF, etc.) 6. Lease Designation and Serial No. 52 'KB ADL 47434 7. Permit No. 8. APl~Number ' 50-029-2,1244 '- 9. Unit or Lease Name Milne Point Unit 10. Well No. C No. 5A 11. Field and Pool Kuparuk River Field Kuparuk River For the Month of Hay · 19 85 12. Depth al e~d of month, foo~ drilled, fishing jobs, directional drilling problems, spud date, remarks None. 13. CasJ~j o~ ~ne~ run an~ quamities o~ c~ment, results of pressure tests None, 14. Corirtg resume a~d brief description None. 15. L _c,~s run and depth where run None. 16. DST data. perforating da~a. sho~s of H2S. m~sceJJaneous data None. Well suspended. Completion report to follow. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed ir~--duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 - STATE OF ALASKA ALASKA '_ AND GAS CONSERVATION C~: MISSION MONTHLY REPORTUF DRILLING AND woRKOVER OPERATIO I1. Drilling well [] Workover operation [] 2. Name of operator Conoco Inc. 3. Address 3201 "C" Street, Suite 200, Anchorage, Alaska 99503 4. Location of Well at surface 543 ' FSL, 2242' FEL, Section 10, T13N, R10E, U.M. 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 52' KBI ADL-47434 7. Permit No. 8. APl Number 50- 029-21244-t9/ 9. Unit or Lease Name Milne Point Unit 10. Well No. C No. 5A 11. Field and Pool Kuparuk River Field Kuparuk River For the Month of, February , 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks None 13. Casing or liner run and quantities of cement, results of pressure tests None 14. Coring resume and brief description None 15. Logs run and depth where run None 6. DST data, perforating data, shows of H2S, miscellaneous data None. Well is suspended. Completion Report to follow. Alaska Oil & Gas Cons. · 4nch.oraoe ~ornmission 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED ~' /- /~-oj'J~'' ~-~'''' TITLE ~'~y~' ~"?'J '; ~ /~J. L~j, r. DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 . .scHujMBEk}GER OFFSHORE sERVICES A Division-of $chlu.,.-r..berger Limited HOUSTON. TEXAS 7700! CONOCO, INC. 3201. "C" STP, EET ANCHORAGE, AK 99503 Attefftion' DAN ROBERTSON PLEASE REPLY TO POUCH 340069 PRUDHOE BAY, AK 99734 ATTN: BAP, BARA HARRISON PAGE 1 OF 2 Gent[,-:, ;m,n' Enclosed ore.. ...... 2 prints of the 2" Corr'ffx _INC_ Field & 5" RESISTIVITY LOG t Counh/. NORTH SLOPE n ~ Al Aq Additionel prints are being sent to: _!_?.:!3...-.}rints & ]_RF C,.}~., ...... O, INC OFFSHORE EXPLORATION E.W..A. DIViSiON, P.O. BOX 4444 HOU~f'['ON, TX 77252 1EL prints & 2RF CHEVRON U.S.A.~ P.O. BOX 107839 INC. ~' .... - ..... AK 995] 0 AT~N: J. L. WEAVn.~R ] BI'., prints & ]RF .... ::;.qi~ ........ f?_.__ CON,.,C.), IN .... _ ..... P.f'.:..S. RESERVOIR SECTION P.O. BOX 2197 ................................... _.?]0..t'.,s TR~b__T~_ ...... 72. ?.SL AS'TN' O.G. KI _.!1.3T ..... p,'ints ~_._0 ..... BP2~12E7 ....... _P.9 N (; A___Q!_TJ ..... _Q.K ..... ]%6 0. Az~:.~: H.E. GIlLILAND_J63 VVe appreciate the privilege of serving you. _!}3_L_ .... prints & 1RF P.O. BOX 1257 ~::~CT .~WOOB CO 80 i RD ATTN: DALE BOSSER? 1BL prints & 1RF READING & BATES PETROLEUH CC~ C~;~ PI['-]E~-~z TOWER 3200 MID ..... - ~ '~ i~_ULS~ OK 7 41_0_.3 ~ ~N: C.E ...... JR · .. R-- -A985 ' DA_~s~: Alaska Oil ~ 6as ~ons. ~mm~ssion An~hora~ Very truly yours, SCHLUMBERGER OFFSHORE SERVICES A.D. HUFFMAN Er_, ~O .... OFFSHORE A Div}sion of Schlumberger Limited HOUSTON. TEXAS ~7OO I POUCH 3400¥9 PRUDHOE BAY, AK 99734 ATTN: BARB~RA H~RRiSON PAGE 2 OF 2 Gentlemen: 2 !~oc]osed ore ....... prints of the ..... Field ........ .M...:T__.!_, N_ ~ _...z? -:[.N T 2" a 5" Indushion Resistivity Log ., Well C-5A County NORTH SLOPE Stote ALASKA Additionat,Drintserebeingoen, ~ *to: 1 --. CfTI.E:S SER'VICE OIL AND GAS CORP. ....... ~j-,;:~_ ?~ ~' ...... ~ ..........~ ......... -~ ..... ; Bz,~._,:,~.~.o IE~D ~ CA 9 ~ 3 0 2 ............................... ................................................... C/O JIM QUINN ......................................... prints -! ............ prints prints ........ I) 'ints __prints ....... prints prints The film is .... ¥_eturned to CONOCO We appreciate the privilege of serving you. D~E ' Very truly yours, SCHLUMBERGER OFFSHORE SERVICES A.D. tIUFF~\N DISTRICT MANAGER SO.";- , 5~,5.A ~ ~ STATE OF ALASKA ~ ~ ' ALASKA 'LAND GAS CONSERVATION C( iMISSION -'7 MONTHLY REPORT'OF DRILLING AND wORKOVER OPERATIONS . Drilling well Workover operation [] 2. Name of operator Conoco Inc. 3. Address 2525 'C' Street, Suite 100, Anchorage, Alaska 99503 4. Location of Well at surface 543'FSL, 2242'FEL, Section 10, T13N, RIOE, U.M. 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 52'KBI ADL 47434 7. Permit No. 8. APl Number 50-029-21244 9. Unit or Lease Name Mitne Point Unit 10. Well No. C No.5A 11. Field and Pool Kuparuk River Field Kuparuk River For the Month of January 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks TD - 36' Rig released on 1-10-85 13. Casing or liner run and quantities of cement, results of pressure tests Si ze Wt. Grade From 7" 26 # L-80 O' To Cement 11,091' 900 sks. Class G, 426 bbls. 10.2 ppg. NaCl~ 14. Coring resume and brief description NONE 15. Logs run and depth where run Logs From To DILr IRT-J 10,780' 11,014' 1 6. DST data, perforating data, shows of H2S, miscellaneous data 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. TITLE Drilling Supervisor DATE ,~Z, NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 STATE Or: ALASKA ALASKA (~ ~ AND GAS CONSERVATION CO. ~llSSION MONTHLY REPORT OF DRILLING AND WORKOVER !1. Drilling well~ Workover operation [] 2. Name of operator 7. Permit No. Conoco I nc. 84-228 3. Address 8. APl Number 2525 C Street, Suite 100, Anchorage, AK- 99503 5o-029-21244-,~ 4. Location of Well atsurface 543' FSL, 2242' FEL, Sec. 10, T13N, RIOE, U.M. 5. Elev~oln i~eet (indicate KB, DF, etc.) 16. Lease~[~gn4at~o~rd Serial No. 9. Unit or Lease Name Milne Point Unit 10. Well No. C-5A 11. Field and Pool Kuparuk River For the Month of. December ,19 84 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Sidetrack at 6100' on 12/25/84. Depth on 12/31/84 = 11,200'. 13. Casing or liner run and quantities of cement, results of pressure tests 9 5/8", 47#, L-80, 0'-6020', Cement to Surface 2000 sks. Permafrost "E" 950 sks. Class "G" 14. Coring resume and brief description 15. Logs run and depth where run 6. DST data, perforating data, shows of H2S, miscellaneous data R[-CEIVED FEB i 5 1985 4~aska Oil & G2s Cons. Commissior~ Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate TO: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 (907) 279-1433 Receipt of the following material which was transmitted via /~. ~ / is hereby acknowledged: QUANTITY DESCRIPTION ., RECEIVED: DATED: Copy YES sent to sender No Conoco Inc. 2525 C Street Suite 100 Anchorage, Alaska 99503 January 22, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001PorcupJ~ne Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Attached is a Sundry Notice for Milne Point Unit Well C-5A. It is proposed that the Laminated formation in this well be fracture stimulated with a small scale (15,000 lbs. of Proppant) frac job. The treatment will. be done around January 30, 1985. If you have any questions, please call Don Girdler at 279-0611. Very truly yours, John R. Ke~p Manager of Alaskan Operations DRG/kr cc: MP C-5A Correspondence Fi].e STATE OF ALASKA ALASKA~,,~L AND GAS CONSERVATION CCtv. MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELLE~ COMPLETED WELL[] 2. Name of Operator 7. Permit No. Conoco Inc. 84-243 3. Address 8. APl Number 2525 "C" Street, Suite 100, Anchorage, AK 99503 5o- 029-21244-01 9. Unit or Lease Name Milne Point Unit OTHER [] 4. Location of Well 543' FSI,, 2242' FEL, Sec. 10, T13N, R10E 5. Elevation in feet (indicate KB, DF, etc.) RKB 52' Pad 17' 6. Lease Designation and Serial No. ADL 47434 10. Well Number C-5A 11. Field and Pool Kuparuk River 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [~ Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that the laminated zone (10,874' - 84' and 10,894' - 10,902') be fracture stimulated. The ].aminated zone was flow tested on 1-14-85. Because of skin damage indicated from build-up and low flow rates, it is proposed that the well be fractures with 2250 gal of slurry with 2 ppg of proppant and 2250 gal of slurry with 5 ppg proppant. A breakdown test will be run prior to the frac job. This work is expected to take place 1-30-85. RECEIVED JAN 2 1985 Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~,~~- ~ Production Engineer Signed ~ Title The space below for Commission use Date 1-23-85 Conditions of Approval, if any: Approved by BRI~II~AL SlG~ED ! ~.y L"'J' [ C. SMITH Approved Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA ALASKA '~r- AND GAS CONSERVATION CC~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 4. Location of Well 543' FSL, 2242' FEL, Sec. 10, T13N, R10E, U.M. 1. DR I LLI NG WE LL J~ COMPLETED WELL [] 2. Name of Operator 7. Permit No. Conoco Inc. 84-243 3. Address 8. APl Number 2525 C Street, Suite 100, Anchorage, AK. 99503 50_029-21244-01 9. Unit or Lease Name Milne Point Unit OTHER [] 5. Elevation in feet (indicate KB, DF, etc.) RKB 52' Pad 17' 12. I 6 . Lease Designation and Serial No. ADL 47434 10. Well Number c-5 11. Field and Pool Kuparuk River Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed_work, for Abandonment see 20 AAC 25.105-170). The C-5~we].]. is to be completed in the Laminated and the Middle Kuparuk Formations as follows; It is proposed that the Laminated Formation be perforated with 5" wireline guns then a production packer be rUn in on 3~", 9.2 ppf BTRS tubing with gas lift mandrels and a SSSV. The production packer will be set above the proposed Middle Kuparuk Formation. The drilling rig will then be released. Once the rig is off the well the Laminated Zone would be tested. Proposed test to include rates, drawdown and a build-up. After testing the Laminated Zone, through tubing guns would be run to perforate the Middle Kuparuk at 4 spf. The two formations would then be tested together. To suspend the well, the top 2000'+ of the tubing will be displaced with diesel, the SSSV wi].], be closed, a BPV wi].], be set then the SSSV will. be closed. RECEIVED J AN 0 8 1985 Alaska Oil & Gas Cons. Commission Anchorage 14. I her~certify that the foseqoing is true and correct to the best of my knowleCge. Signed V~ Title ?roduction En~;ineer below for Commission use Date 12--21--84 Conditions of Approval, if any: Approved by Approved Copy ._ 1: By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate o J Ol,i ×h ..... ~ · , , ......... · _._ , , . ; _ -; ....... ~_ _.! ....... - · : . · ; I, i ....... ; : - ._ . ; .. . :.- i .... ;- i : i .... ~:-- .... ~ ' · ; ..... : .... i ; - ] : ~ ' · · , . '""" I - - ~ : : i : ::: '. ~.- -- ' ':!'- · ; ........... , .... · . ELLDfA, , . , ,, :::' ' : ' : ! -;- -! '-:' : :: ';: ; ~~ i ' ' :::-:::i :::-:i;:::;: ::!:- :' :l::::-tT::: ':::'." ! ' ! ::' ::i: '-I :':: i::: ! ::" - :::I -: i :':i::: :: :..r ~:-:' I : : :::: ::- i-:::j:.:: :~:' 'i ~ i ' I ..... i ................ .... ! .... ~ .... ! .... ~- '-~ ......... i-.. . i . ~ ..... ~ ........... ; I -! ! ..... { ' '-I '- - i ........ · :.- - ; ' ~ ~ I ~ -! ..... ~-- -i ....... i - : d' --~- 'i ....... t-- -!-- - .. ; ,- : _..£~,r,~. ;'I~Zb?I~F~ItlM1~_I~ .... : ' "~ '"i' '~ -'-i ' ;-- -I .... ~~ , l..: ::.:: :' , : 1' : :::: .: ;':: l:Tz~::::: ::~: ::i :. ~ :~. , · " '- · ~'- - : - ~ .... ~- '-- ~- - ~ .... ~ ..... ~ .... , - ~-- I---~ -- ' ": " ~- I , T.~'~~~~,.- ~ .~ --; -: - : ;---~.- :' ' 'l' ;.. .i . ~ ..... i :-- ' ~ '~- - ~- I - : .... : .... i- - ~ .... i -- ~ ..... t ............... t-", ......~ , ..........t I ~ ' i ..... i ....... I--~ .... ~.. :1 i -I~ ...... F~ ~u.w,~_.., ...... , ._, , .......... ~ ..... ~ _._, .... . · ~ .... : ! ....... i- t ~ - - ~ { ~ i -~1-- ~ .... [ ..... ~ - ......... , , ; i I j ~' i I ; ~ ..... : .... ; ...... ~ ........ 1:---~- - ~--- -- ~~ '-- ~i-- : .... ~- ---~-~----'~--'' · ' '1 ~ I' ' ~ ' '; ~'~ t ........ ~ ..... + ......... ff .... t- - ;--- t ........ ~ --i .... " I~~ ............. I .~ ...... ~, --~ ...... ~ ............. ~ ~ .... l---~ ....... ...................... ,~1 ~ .................. ~--~ ...... $ '~ ..................-F ~ ~"' .... ~ .... ~ .......... ] ...... ~- ..... ~_ -~ .... ~~, --~ ~?:~ ........ ~ -:~T .--~-~ ~ -. ' ' ' ~ .... [ ..........~ ~: ....... ~__3~~~ .......... ~ .... ~ ...... ~ ....... ~ -~----~ ....... ;~--~ .... ~- ' ..... ~ ................... ] ............. ~ ..... ~ -~~-~l--- ~ ..... ~ -~ -l~-~ ~-- .......... ........ ............. ..... _, ...... .......... ....... ]~I ......... i ..... ~ .... ~ .... ~ ....... ~ ..... t .... ~~ ~ ~ ~ -~- ~---~, .... i .... ~-- ....... - , ............. !-- -t~--~ .... ~-t .... ~----t .... b-~-i~- ~----l-: -~ .... ~- i~ --t H .... 1 .... ' . ~ ' ', ..... ' . ..~~~~ ...... i -~ i ~ -4 ......... ~---~ -~1 ..... L_~_~t_ -4 .... . --~-__ I ..... ' .... I" ; ..... ~ ..... ~'~ t--+ i -- -~--~' ~1 ..... ~~--!--~ ~T- -:-~ ~ -1'--~- --~m~ .... ~ .... ~. --~ ' ~% .... , .... , ............. :'- 7 .... d ...... I ---% -~ " --Z-~I i .... ! ..... ~ "- .... , ................. ~ ....... , ............. .. , -~--~%~---, ..... ~ · .......... i ~ ...... ~ ---f---~:~~ ...... ~ ~~ ~ I i - ~h~-- t .... ~ ~--~ i ....... 't ....... ~'- ~ '~----t~---1 .... ~---I--~.--~ ....... t----t--- F- ~: '----F ..... -- -- I .... i ......... { .... ~- t--~~~ i I i I ~ : l- ~ -i-- --' ..... ~-~ :: :.. i:..; ~ ::: I: ::-~F~-'_~"~~m~J~~,~k~ _~~ i-~:::: --:- --~ :::~ .... t ............ i---~--f ~-- i m4~ ~ _ ~~ _~__~_ ~___~::_~_: .... ~_~ .... ........ % i'"~ .... ~---1 .... ,:~-~ ~- , , ,, , .. / , ,--;.--.~.~--~ . ~ ............... t .... ' ' -- ~ ~ -- I L ~ ~-- -~ -- ~--- ~~ -~-4 ........ "~. ' ............ ~-% ~ - · ~--- , ,~ ...... ~ ..... ~-~-~.~-h-., .... "~ ............ i i ~~ L ......... ~-.! ..... :" t ...... ~ .- ~, ....... ~ ........ .¢~-~ -~ h ': ~ ~~-~ --~:~4__ --- i .... t .... ~ .... i::::i:::: :":i' :I':'~ !'-:--:~-'i--'-~~~q ~~~ i ~ -~--t :: -,I :::. ........ ~l - I ....... ~ ....... i .... ~ .... %-~ ...... .~-~: . i -~l .... ~---~~-~4---- ....... ~ .............. ~, i--- ,' I i ~ ~ ,. I -~ti ~: ~- ~---l'l -: , *- ~ -~-~-~ .. .~ ............. ~ ......... 1__~__: : I i i , ~ ; ~- ..................~ ~t~- , _ ~ , ~ ! -~4 .... ~ ............. i ......... I-:--~ ~ :1 ~ i ! I : I !--~~t~--i~- . --- -~ .... ,... , ..... , -, ........ .. , ..... .... ~ ,,- .... B.~v ~ ~~c~*., , , : , ;L~~~ h · ::::i:::: ::.- ~ 2 :::: :::::~'5~ ~4~- ~--F~q ..... w~ ..... t ....... i ................ ~ ....... ~ / . I I · ; i ! ~ ~_ ._~~~ .... ~ ............ i ..... l ........ 1-:- ~ · I t I I: i I ::::,::': :::: ::'-::-:: :::: .... ::t:::--J:~ ~-: ~~~ , , ... ~ ....... i ........ i ....... ~ ....... --!: ~ I: ~! ', ~ ! ~ --f-- ~---~~I .... I :::.:i::: ::'-':.:-I--::~ :. ::::::::::::::::::::: .... ~~~ i~',--'~---~~'F .... ........... i ..... ~ ....... t ...... 4 ....... ~ ........... ~ ........ ~4 ~ ~,~~ .~-.-: ~-~---4 .... ' ~ ..... I' l: · ,~'~- -t. I1~I-¢~~~I~'-'i~t~-~-15-~ ...... ~ .... i~-~---~-- ~ ~ -- · ~ ~ .... :-.. ~ ....... ~ .--t .... i-'- '- --'~ .... J-"-_~--?-~~-- ~ ' - i~_!'~d~~-~:_~._L..~ ::::I:':. :.:':'' ::::~: :: :~:-~:~z---~ -4 ~ ' i-~ ~: i ~ I---~-~~-~ ----~ ....... ~ .... ......... ........ I ..... ! .... ..... .... ......... ~ ' · ' I ............ t ..... h ..... ~----I---7~ ~ ..... ~--~ .... ~--~- --d-~~-~ - I -~-~ .... l---t~-- ' .................. ~ ....... ~ ''2 ......... ~ ~ · ' ~ - ~ , ' .... ~ ..... ; ..... ~ -,. ............ . ~ --~--. ............ ~ ; ! .... ~ .... i~- ~ --~- ~ .... ~ ..... ' .................... ~--~--~ ' -~-~-- i .~i. Au'--~-~fi~----~----~ .... ~q -~+ - ................. ' ....... ~~' --t " ~'. i~'-':~ :~--~---!:=fl~::! ~, ..... ,I :'1 "~-"~'" I .......... i ....... I'--~- : ' ................................................ ::': '.:' ::l":--i:"':::':'-:-:~:~---:~i i ~ .... · - .............. ........ ..... , .... .... : · · · ~ I · · - ; ..... ~ ....... d-~ -~ ~- ~--~ .... ~ ..... ~ ~fl .... : ...... , - i ~ ...... ~ ....... : ........ ~__ _~___~_~ .... ---~ .... ~ .~ .... .L .... ~ ....... .... ~---:--q---~--,':- · · - ~ ....... ~ ........ t ......... I ...........-~~ ~---~ "~ "_~' ~ -J' "i': .... : ..... ~--'~ .... i-- ,-:-~'l .... i .... I ~--F~-l~r- ~F .... ~:~,'~-~--- ; ' : ..........t ', ...... 1 ........ :~ .......... ~ ..... ~ ~ -' ~*- · : I '~~~ -"-- - ~ .... * ..... ~---<'--~-~ ..... John R. Kemp Manager of Alaskan Operations Conoco Inc. 2525 C Street Suite 100 Anchorage, AK 99503 December 31, 1984 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Attached is a Sundry Notice for Mi]ne Point Unit Well C-5A. The Notice is an application to increase measured depth from the permitted 11,010' to 11,400'. The increase in measured depth is a result of higher hole angle. Verbal approval to exceed the permitted depth was given by Harry Kugl~r on December 28, 1984. If you have any questions, please call Don Girdler at 279-0611. Very truly y~.~.._ ~laskan Operations DRG/kr cc: MP C-5 Correspondence File RECEIVED j AN 0 4 l B5 ~,~sK~ 0i~ & Gas Cons. Commjss~'°r~ Anchorage STATE OF ALASKA ALASKA-...~- AND GAS CONSERVATION CC..~MlSSlON SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL I~, COMPLETED WELL [] 2. Name of Operator 7. Permit No. Conoco Inc. 84-243 3. Address 8. APl Number 2525 C Street, Suite 100, Anchorage, AK. 99503 50_029-21244-01 9. Unit or Lease Name Milne Point Unit OTHER [] 4. Location of Well 543' FSL, 2242' FEL, Sec. 10, T13N, R10E, U.M. 5. Elevation in feet (indicate KB, DF, etc.) RKB 52' Pad 17' 12. I 6. Lease Designation and Serial No. ADL 47434 10. Well Number C-5A 11. Field and Pool Kuparuk River Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other ~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The subject we].], was permitted to a total depth of 11,010' MD (7350' TVD) with a maximum hole angle of 56°. As the well was drilled the hole ang],e increased to over 60° (62.9° maximum). Consequently the measured depth of the well and the setting depth of the production casing will .be greater than anticipated by 400'. We expect to exceed the permitted depth by 12-30-84. Verbal approval was given by Harry Kuglar on 12-28-84. Proposed Depth (MD & TVD): 11,400' MD (7350' TVD) RECEIVED JAN 0 4 1985 Alasl(a 0il & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed v~--~f~--'~. ~-~_~_. _ Title Production Engineer The space below for Commission use Date 12-21-8~ Conditions of Approval, if any: Approved by COMMISSIONER Approved Copy Returned the Commission Form 10-403 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate December 21, 1984 .Mr. Don Girdler Production Engineer Conoco Inc. 2525 C Street, Suite 100 Anchorage, Alaska 99503 Re: Milne Point Unit No. C-5A Conoco Inc. Permit No. 84-243 Sur. Loc. 543'FSL, 2242'FEL, Sec. lO, T!3N, Rt0E, TJM. Btmhole Loc. 591'FSL, 877'F~.~L, Sec. 9, T13N, R10E, UM. Dear Mr. Girdler: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required.. Samples of well cuttings and a mud log are not required. A continuous, directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the' regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operationS you may. be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowOut prevention Mr. Don Girdler · Milne Point Unit C-5A -2- December 21, 1984 equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Co~mission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a w~_tness present. Ver.~z~_trutv~Y~xUrs, / C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COt~ISSION be Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o enct. Mr. Doug L. Lowery STATE OF ALASKA ALA~L AND GAS CONSERVATION C~ISSION PERMIT TO DRILL 20 AAC 25.005 ~AI-] [] lb. Type of well EXPLORATORY[] SMI~GL~Tf~ DEVELOPMENT OIL E~ NE DEVELOPMENT GAS [] % la. Type of work. DRILL REDRILL DEEPEN 2. Name of operator Conoco Inc. 3. Address 2525 C Street, Suite 100, Anchorage, AK 99503 4. Location of well at surface 543' FSL, 2242' FEL, Sec. 10, T13N, R10E, U.M. At top of proposed producing interval 660' FSL, 1320' FWL, Sec. 9, T13N, R10E, U.M. At total depth 591' FSL, 877' FWL, Sec. 9: T]3N, RI~F._ 5. Elevation in ~e~t~ind~:a't-e' KB, DF etc.) I 6. Lease desi-gnation arid s~ria] RKB 52_', P__ad 17' I ADT. 47434 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number 8086--] 13. Distance and direction from nearest town 14. Distance to nearest property or lease line feet 33 mi,_ _N~ _of__]le_adhorse miles 877 ' ' 16. Proposed depth (MD & TVD) 17. Number of acres in lease :lt~010' MD (7350~ ~1)) fe.t 19. If deviated (see 20 AAC 25.050) KICK OFF POINT ~_] ?C) feet. MAXIMUM HOLE ANGLE 21 SIZE i Hole Casing Weight 17~" 13 3/8' 48 2 i 12¼" 9 5/8' 36 [ 8~" 7" 26 , 22. Describe proposed program? 9. Unit or lease name Milne Point Unit 10. Well number C-SA 11. Field and pool Kuparuk River ~56i20. Anticipated pressures AA (see 20 AAC 25.035 (c) (2) Amount .~^ 15. Distance to nearest d'rilling or completed f'_O well -7~, ~ o..--~ feet 1~. %pproximate I 9_9 ~_~/, ~-p~g~ ~ ' Surface 3000 psige _ _ ft. TD (TVD) 3800 Proposed Casing, Liner and Cementing Program CASING AND LINER Grade Coupling H-40 PELP L-80 BTRS L-80 BTRS Length 80' 6212' 11010' SETTING DEPTH MD TOP TVD I 35'1 35' I 35' ' 35' 35' I ~ 35' MD BOTTOM TVD I 115' Ii 115' 6019' I 4558' 10975' I 7315' I QUANTITY OFCEMENT (include stage data) in place in place 700 sxs. Class "G" Conoco Inc. proposes redril].ing the C-5 well as a delineation well in the Kuparuk River Field. The mud system will be non-dispersed ]_ow solids with a minimum mud weight at kick-off of 9.5 ppg. Mud weight at T.D. will be 10.2 ppg. A 13 3/8", 5000 psi RSRRA BOPE stack will be used on the surface casing. Pressure tests have been performed on the surface Casing. BOPE wi].], be tested as per AOGCC regulations. Maximum surface pressure is based on ~nitia]. reservoir pressure and a wellbore containing 20% mud and 80% gas. Casing will be tested to 1500 psig. C-5 is a significant distance from any existing wellbores on the surface and wi].1, not be any c].oser downhole. Arctic Pak will be placed in the 9 5/8" x 7" annulus after disposing of the test oil and excess drilling fluids. The well will be perforated and completed with the drilling rig. Following the release of the rig, the well will be fracture stimulated. The production tubing will be 3~", 9.2 ppf, L-80 BTRS. 23. I herebv"e'er4ify that the foregoing is true a~ml~correct to the best of my knowledge SIGNED ~ TITLE The space bel~v~oi Corem,ss,on use 12-21-84 DATE Samples required E~]YES F-~NO Permit number APPROVED BY Form 10~[01 CONDITIONS OF APPROVAL Mud log required I Directional Survey required I APl number []YES ~NO I I~YES []NO , Approval date I SEE COVER LETTER FOR OTHER REQUIREMENTS 42/ z/§4 z?_/.// // //~.~. ~ -~ ,COMMISSIONER DATE December 21, 19;84 Submit in triplicate SUPPLEMENTAL DATA SHEET APPLICATION FOR PERMIT TO DRILL Conoco et al - Milne Point No. C-5 Conoco Inc. 2525 "C" Street, Suite 100 Anchorage, Alaska 99503 I. CEMENTING PROGRAM The 7" production casing will be cemented in two stages. The primary cementing job wi].], consist of 700± sacks of Class "G" cement pumped around the casing shoe (estimated 2000± of annular cement, assuming an AHS=ll"). The secondary cement job will consist of 200± sacks of permafrost type "C" cement followed by 60± barrels of Arctic Pack, pumped down the 7" x 9-5/8" annulus. II. ANTICIPATED GEOLOGY 6120' - TD Predominately shale until the Kuparuk Sands - expected at 6600'± subsea TVD. III. FORMATION EVALUATION A. Sidewall cores to be taken as determined by onsight geologist. Bo Wireline logs for the 8~" hole from T.D. to the 9-5/8" shoe will include: Dual Induction Laterolog; Sypherica].ly Focused Log; Formation Compensated Density with CNL and GR-caliper. IV. DRILLING FLUIDS Low solids non-dispersed gel/water mud system 6120' - T.D. V. DIRECTIONAL PROGRAM The well is to be sidetracked at a depth of 6120' from a hole angle of 47° and direction of N78°W to a hole angle of 56° and a direction of S81°W. This hole angle and direction are to be maintained to T.D. A MWD tool is to be run for directional control. RECEIVED DEC 2 Alaska Oil & 6as Cons. Commission Anchorage ....... ~000 t [ · Sooo PAD C.. WELL. NO, 'SAI: REV~ISED! I , TvD-. T,t'ID=6 1 .N '78 DEG ' T ................ NO SECTION' PLOTTIN '',. ~ i : I [ [ "i 89 DEO 3 tll N W PAD C, WEL! ' ·' ~'"~i EASTHAN i wH SLOP£, ^L~ :K, ]: 'FEE1 "Nl89: I N .... ;W, ' ' '660' FSL , ..;.-:-.,,SEC ..... 9 "FSL. CONOCO INC. MILNE POINT UNIT BOP STACK Fill-up Line6 ~Flow Line Preventer (1) B.O.P. stack size rating meets API RP 53 & spec 6A for class 5M with clamp & hub connectors all hydraulically operated. (2) BOPE to be operated on each trip & pressure tested weekly. (3) Hydraulic control system for BOPE- to include (5) station control manifold located remote with 160 gallon accumulator and reservoir unit and auxiliary energy source for system activation. (4) Ram type BOP to include a minimum of one set of blind rams and two sets of appropriate pipe rams. (5) Choke and kill manifolds shown seperately to meet API RP 53 class 5M requirements. RAM 13 5/8" - 5000 --RAM-- 13 5/8" - 5000 2" - 5000 Side Outlets 3" - 5000 Side Outlets 3" - 5000 Side Outlets RAM 13 5/8" - 5000 11" - 5000 RECEIVED 0Ec Amska 0il & Gas G0ns. O0mmissi0. Ancb0ragm ALASKA UNITED DRILLING RIG NO. 3 LIQUID MUD SYSTEM Active pits Solids removal function 4. each: 6"x 6"centrifugal pumps, 75 hp Reserve pits 16 each: Lightnin' mixers, 5 hp CAPACITIES ACTIVE SYSTEM I Sand t~ap 6 bbl I Oegasser tank S6 bt)l I Desander suction S~I bbl I DesiRer suction SS bbl I Del, liter discharge 66 bbl SUBTOTAL 2:17 bbl Mud Tank No. I I Common 38 2 Suction 122 bbl Mud Tank No, 2 Receiving 184 bbl Dl~chalge 184 bbl Mud tank NO. 3 2~t0 bbl SUBTOTAL 768 bbl ACTIVE SYSTEM TOTAL IOOS bbl TRIP TANK 150 bbl SURFACE VOLUME GRAND TOTAL (Calculated 4' below tank lop) CHOKE MANI FOLD: Working Pressure Choke (1) Type Choke (2) Type 10,000 psi w/ (2) HCR valves (2) Manual ,(1) Automatic ALASLA UNITED DRILLING RIG NO. 3 BUTTERFL¥~ ~/,~,LVE CLOSED DESANDEI' SUCTION CLOSED C~ O Flow path ½. _~ Solids removal I .... ;~ DEG,~SSING FLOW PATH 1 Flowline lin) & pass shaker screens 2 Shaker discharge into sand trap (ditch to pit room closed} 3 Sand trap overflow into degasser suction (desander suction closed} 4 Degasser discharge into ditch S Overflow returns to degasser suction (underflow butterfly closed} 6 Switch desander suction out of degasser t~nk 7 Desilter suction (Normal} 8 Cleaned mud to treatment pit 9 Underflow from treatment to suction pit 10 Gravity-flooded suction ITEM APPROVE DATE CHECK LIST FOR NEW WELL PERMITS Company r.~c- tJ va (1) Fee s?~ /L-1..'fi'I{ 1. Is the permit fee attached .........................................~- (2) Loc /1~ 11.-7.,11'1' 2. Is well to be located in a defined pool............................'. - (2 thru 8) 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party................................. 8. Can permit be approved before ten-day wait .......................... . )I¡rll 11~~/1~ (8) (3) Admin ff~ 11.-1.'1~., ( thru 12) 1/ J/I I ~ ;2. Y -'?' (10 and 12) ( 4 ) Cas!\ )}JII 'it'll' <¡ (13 thru 1) (5) BOPE ;!J}/ ¡,;/J.LJ/S4 (22 thr~ (6) Add: lIiFlI I1/4li Geology: 1M{ ~ LCS WVA /~ JKT JAL ?fb rev:" 10/29/84 6.CKLT Does operator have a bond in force .................................. ~ Is a conservation order needed ......................................~ ~ Is administrative approval needed ................................... ~ Is the lease number appropriate ..................................... ~- Is conductor string provided........................................ .HJ:f - IN pi..lfC,£ Is enough cement used to circulate on conductor and surface ......... ~ " Will cement tie in surface and intermediate or production strings ... ~- Will cement cover all known productive horizons ..................... ~ Will surface casing protect fresh water zones....................... 1Ii!l:i - IN pI-IKE- Will all casing give adequate safety in collapse, tension and burst.. ~ Is this well to be kicked off from an existing wellbore ............. I Is old wellbore abandonment procedure included on 10-403 ............ ~ Is adequate wellbore separation proposed ............................ - Nb N~RRY MJELLj f 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to ~ b1fl> psig. . Does the choke manifold comply w/API RP-53 (Feb.78).................. Is the presence of H2S gas probable ................................. 27. Additional requirements . ............... .... ..... ........... ..... .... Additional Remarks: Lease & Well No. ¡'1¡JL( c.-s-A YES NO REMARKS (r t::I 0 1-3 :cz HO 001-3 ~~ >H nl-3 t:E:It:E:I " H Z - I1il11 so LJ R F /fCE. t!..A 51 IV 6 ,.5 I/) P )..A-C.E &01 IJÆ1f - lliõJ Ñbr: SIJ8/11 J TTED 'C. - Iii!l1 IAL ON/ FF INIT O. 0 POOL CLASS STATUS AREA NO. SHORE LfC, I) I () rJ t?t-J '-od.:! ð" ~.,) I! 31-~ bN I I I GE UNIT --- - - -- -- --.- ----.- - -- --~._----_._-_.- ----- Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologicallY organize this category of information. 0'£ u..Jcn -;::>...... -- C'\I u..I N UZ u.I~ ~ c. /vIi Ine P+ ~-5A (ðj1e/1 kð/eJ 'II Ô~34~ ****************.****. * . * , * * ******f'*'*.********** *-----w.-------~-~.--* *-.--5CHLUM8ERGER.-~.. *--~~._---~-"--_.~.... *****..******.***.*.** c:. .¡ .~ ~ ~i 8~ rii c.ð LIS TAPE V~RIFTCATIO" LISTING 5 ~ ~ c. --( LVP 01n.HQ2 V[RIFICATION LISTING *' REEL HEADER f' SERvtcr NAME :FDIT DATE ;85/01/'1 ORIGIN: REEL NAME: CONTINUATInN # :01 PREVtOUS REEL: COMMENTS: ** TAPE HEADER *. SERVTCF NÅ~E :r.DIT DATE :R5/01/21 ORIGIN :0000 TAPE NAME :9958 CONTINUATION" :01 PREVIOUS TAPE: C 0 ~ M F. r,~ 'J' S : ********** EOr ********** ** fILE HEADER ** FILE NAMF. :F.DTT .on1 SERVICF. NAME: VERSION # : DATE r MAXIMUW. LENGTH: 1024 , IIJ t£ T Y P F : PR~VrO{TS FrLF ** INF~R~ATlnN Rr.CORDS ** "'1NE:M CONTENTS ---- -------.. CN : COI\JO('O ALARt(~ WN : MPU ("-5A F'N : KUPARUK RIVER RANG. 10E TOWN: 13M SECT: 10 COUN: N.SLOPF.: STAT: AL1ASKA CTPYt ttSI\ * * COM fA &: ~¡ 'l' S * * PAGE U~IT TYPE CATE SIZE CODE .....-- ---.. .....- -.-- -..I'll. 000 000 013 065 000 000 022 065 000 000 014 065 000 000 004 065 000 000 004 065 000 000 002 065 000 000 012 065 000 000 006 065 000 000 003 065 *=============~=====================================* srifr,tIMBF.Rr;¡.~p (.. ( 1 -=( LVP 010."02 VERIFICATION LtSTING PAGE : ALA5~A OIVISION CQMPUTING CENTER : * = = = = c: ===:=3;:====================:;'1:= -===...;:==........* CO~PAÑY = CONOCO A~A5KA WELL = MPU C-SA FIELD = KUPARUK RIVER COUNTY = N.SLOPE STATE" = ALASK SECTION = 10 TOWNSHIP:: 13N RANGF = 10F, TAPE DENSITY 800 BPI *=================================================;=* - - r lJ G : I R T J, R lHJ .. 2 JOB # ñ995B RASE DATE LOGGED 5 JAN 85 BOTTnM LOG INTERVAL = TOP LOG INTERVAL = C ASING-l!nGGER = BIT SIZE = TYPE; HOLF. F'L"IO ~ DENSYTY . VISCOSITY = 11014 FT. 10780 ~'T q.625 rAt ra 8 500 IN pot YM,F.R IIJOW 10.40 3R"OO c. 6015 PT. SOLIDS (~ 2 --( LVP 010.H02 VERIFICATION LISTING PAGE 3 PH = q.Oû FLUIO LOSS = 4 40 Rk ~ MEAS. TEMP. = t.A30 @ 67 F RMF ~ MEAS TEMP = 1.990 @ 67 F RMC ~ ~EAS: ~~~P: = 1.210 @ 67 f RM @ BHT = 0,810 @ 160 F LDP: T HALSTEAD . *=======================~================~====~=====* ** DAT~ FORMAT RF:CORf' ** ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 2 1 66 0 4 1 66 1 8 4 l~ 60 9 4 .1IN 16 1 66 1 I) 1 66 0 DATUM 5PF.CIFTCATION RLOCKR MN~M SF-RVICE SERVICE UNIT API API API API FILE SIZE SPL REPR PROCESS In. ORDER # LnG TYPE CLASS MOO NO. CODE (OCTAL) DEPT FT 00 000 00 0 0 4 1 68 8°0000000000°8 SN "'IL ('1HMM 00 040 16 0 0 4 1 68 000000000000 ILD DIL OH~M 00 120 46 0 0 4 1 68 00000000000000 SP OIt.. ~'v 00 010 01 0 0 4 1 68 00000000000000 ** DATA ** DgPT 11051.0000 SN 6.4570 ILO 3.0840 SP -28,7500 f)EPT 11000.°000 SN 8,3125 JLO 2p7813 5P -53,2187 OEPT 10900.°000 SN 16.3438 ILD 13.0391 SP .36,6563 I)EPT 10800.0000 SN 24,96f17 JLO 22.7813 SP -45.0000 DEP1? 10767,5000 ~N 1.1211 TL~ 25.2969 SP 1,187S ** FTL~ TRAILER ** FILE NAM~ :r;:DIT .001 SEP-VTCP NAME .: v E PSI (J '-' # DATE : ( (,. --( LVP OlO.H02 VERIFICATION LISTING MAXIMUM LENGTH: 1024 rILE TYPE: ~EXT FILE NAME: * * TAP F' T R A I II E R * * SERVtCF NAME :EDIT DATE :R5/01/21 ORIGIN :0000 TAPE i\AME :9958 CONTINUATION # 101 NEXT TAPr NAME: COMMENTS: ** kF~I. TRAILER ** SERVIC~ NAME :EDIT DATE :R5/01/?1 QRIGIN : R EEL ~. A M F. ; CONTINUATION # ;01 ~EXT kFEf, NA~~E : COMMENTS: c. ********** ~Or *.******** *****.*.** Eor **.******* ********** Eor ********** PAGE ( 4 --c