Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout161-049 PtiOF T% • S 4,14,, I//iy_s� THE STATE Alaska Oil and Gas „, of TT ® sKA Conservation Commission 5}£== _ 333 West Seventh Avenue ' ' Anchorage, Alaska 99501-3572 7h,,, -� GOVERNOR BILL WALKER 9 Main: 907.279.1433 ALA91F"P Fax: 907.276.7542 www.aogcc.alaska.gov November 8, 2017 Mr. Tim Jones • Cook Inlet Energy, LLC 601 W. 5th Avenue, Suite 310 Anchorage, AK 99501 B .rtr Dear Mr. Jones: The Alaska Oil and Gas Conservation Commission did not witness the surface abandonment of WF-1 (PTD 1610490), WF-2 (PTD 2041430), and WF-3 (PTD 2140030) but accepts photos of cement to surface, casing cutoff, and marker plate installed on each well prior to burial. In lieu of a separate location inspection, AOGCC accepted photographs taken after burial of the abandoned wells and clean-up of the aforementioned West Foreland drill sites. The provided photographs show the West Foreland drillsites to be in compliance with onshore location clearance requirements as stated in 20 AAC 25.170. In addition, an onsite inspection by landowner, Cook Inlet Regional Inc., was completed, and accepts the pad as left. The AOGCC requires no further work on the subject wells or locations art this time. However, Cook Inlet Energy, LLC remains liable if any problems were to occur in the future with this well. Sincerely, Hollis S. French, Chair, Commissioner • Link, Liz M (DOA) From: Regg, James B (DOA) Sent: Tuesday, October 31, 2017 4:21 PM To: Colombie, Jody J (DOA); Link, Liz M (DOA) Subject: RE: Ciri's Plan of Abandonment for West Foreland Gas Wells We did not witness the surface abandonment of these wells but accepted photos of cement to surface, casing cutoff, and marker plate installed on each well prior to burial. Copies of emails with photos attached should be in well files for the followin . - WF-1 (PTD 1610490) - WF-2 (PTD 2041430 - WF-3 (PTD 2140030) We have also not done a location clearance inspection but can accept the letter from CIRI/Salamatof in lieu of that. I recommend preparing a location clearance approval letter to CIE for our records. Doesn't really accomplish anything other than closing out the well history record unless the WForeland field has a separate bond instead of a blanket bond covering all Cook Inlet Energy operations. Jim Regg Supervisor, Inspections AOGCC 333 With Ave,Suite 100 SCWEC+ Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or iim.regg@alaska.gov. From: Colombie,Jody J (DOA) Sent:Tuesday, October 31, 2017 3:48 PM To: Seamount, Dan T(DOA) <dan.seamount@alaska.gov>; Foerster,Catherine P (DOA) <cathy.foerster@alaska.gov>; French, Hollis (DOA) <hollis.french@alaska.gov>; Ballantine,Tab A(LAW)<tab.ballantine@alaska.gov>; Regg,James B (DOA)<jim.regg@alaska.gov>; Bettis, Patricia K(DOA)<patricia.bettis@alaska.gov>; Schwartz, Guy L(DOA) <guy.schwartz@alaska.gov> Subject: Ciri's Plan of Abandonment for West Foreland Gas Wells 1. C�a(ctt t to i13£7C'C:` tsont. % lr.Js/zit Oil and on:sonviaion. Commission ;73 West 7" ;it'enuo :1}'t,t'hoicolge ()111('(),: (01)7) 793-1221 .1'.ix: (o07) 70 75 : CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged 1 RBDMS 2017 •• /, e/ 1/4444cttoSALAMA14F e ,..,•••C R u`N,r October 25, 2017 SCOW r( Hollis French,Chair Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 Re: Plan of Abandonment for West Foreland Gas Wells, Lease C-060324/ADL 392210,ADL 359111, and ADL 359112 Dear Chairperson French: Cook Inlet Region Inc. (CIRI) and Salamatof Native Association, Inc.(SNAI)have received an abandonment plan from Glacier Oil and Gas Company indicating its intent to plug and abandon those wells related to the above referenced leases and leave in place for future development opportunities the West Foreland Gas Pad (WFGP). SNAI and CIRI reviewed the proposed plan for abandonment and also inspected the site after the approved P&A plan was executed. Please accept this letter as consent for leaving the WFGP in place as it currently exists. Respectfully, SALAMATOF NATIVE ASSOCIATION, INC Christopher Monfor President COO INLET REGION, INC (-O&M Colleen Miller Manager Resources 0 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑✓ Suspended lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 2 Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL❑ No.of Completions: 1 Service ❑ Stratigraphic Test ❑ 2.Operator Name: 6.Date Comp.,Susp.,or 14.Permit to Drill Number/ Sundry: COOK INLET ENERGY LLC Aband.: 9/5/2017 161-049/317-350 3.Address: 7.Date Spudded: 15.API Number: 601 W.5th AVE.SUITE 310,ANCHORAGE,AK,99501 10/27/1961 50-133-10028-00-00 , 4a.Location of Well(Governmental Section): 8.Date TD Reached: 16.Well Name and Number: Surface: 879.5'FSL,670.5'FEL,Sec.21,T8N,R14W,SM 2/8/1962 West Foreland#1 Top of Productive Interval: 9.Ref Elevations: KB: 17.Field/Pool(s): 879.5'FSL,670.5'FEL,Sec.21,T8N,R14W,SM GL: n/a BF: West Foreland,Tyonek Undefined 4.0 Gas Total Depth: 879.5'FSL,670.5'FEL,Sec.21,T8N,R14W,SM 10.Plug Back Depth MD/TVD: 18.Property Designation: surface ADL 390368 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11.Total Depth MD/TVD: 19.DNR Approval Number: Surface: x- 190412.3 y- 2475582 Zone- 4 13500'MD/13500'TVD Salamantof Native Assoc. TPI: x- 190412.3 y- 2475582 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 190412.3 y- 2475582 Zone- 4 n/a n/a 5.Directional or Inclination Survey: Yes attached) No ❑ 13.Water Depth,if Offshore: 21.Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 n/a (ft MSL) n/a 22.Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper,resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary RECEIVED SEP 13 2017 23. CASING,LINER AND CEMENTING RECORD 4A GCC WT.PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 20" surface 84' surface 84' 24" 267 sx none 13 3/8" 54.5# J-55 surface 1945' surface 1945' 17 1/2" 1500 sx none 9 5/8" 36-40# J-55/N-80 surface 7360' surface 7360' 12 1/4" 1400 sx none 7" 29,26,23# N-80/S-95 surface 8144' surface 8144' 8 1/2" none 7 26# S-95 8144' 11341' 8144' 11341' 8 1/2" 1500 sx none 24.Open to production or injection? Yes ❑ No Q 25.TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation Size SIZE DEPTH SET(MD) PACKER SET(MD/TVD) and Number;Date Perfd): 2-7/8" 9504' 7095',9221',9423'MD/TVD Oto, 3ocU 09 _-=_- 26.ACID,FRACTURE,CEMENT SQUEEZE,ETC. SCANNED NOV 0 3 2017 Was hydraulic fracturing used during completion? Yes ❑ No Q 9oP9ArffV e]r W d! `( �" i 1 Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED IA.- 14 perforated zones were squeezed w/50 to 100 sx each-all jobs were pressure tested in 1962. 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): n/a Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �0. Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate .. 10.- Form ♦Form 10-407 Revised 5/2017 61' Z 7-r/ZONTINUED ON PAGE 2 Submit ORIGINIAL onl V41) /����- . 14- /�! RBDMS ''SEP 2 1 2017 G- 28.CORE DATA Conventional re(s): Yes ❑ No ❑ Sidewall Cor Yes ❑ No ❑ If Yes,list formations and intervals cored(MD/TVD,From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑ Permafrost-Top If yes,list intervals and formations tested,briefly summarizing test results. Permafrost-Base Attach separate pages to this form,if needed,and submit detailed test Top of Productive Interval information,including reports,per 20 AAC 25.071. Formation at total depth: u'0Y1t MC+ t 0 Li•1 1- 31. List of Attachments: Summary of daily operations,wellbore schematic,photo of cut off,photo of welded abandonment marker,photo of backfill Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Conrad Perry,. Contact Name: Amanda Dial Authorized Title: Sr. 'ce ' : i.-nt Contact Email: adial@glacieroil.com Authorized Contact Phone: 907-433-3808 Signature: Date: 9/13/2017 INSTRUCTIONS General: This form and the req ' ed attachm nts provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 19: Report the Division of Oil&Gas/Division of Mining Land and Water:Plan of Operations(LO/Region YY-123),Land Use Permit(LAS 12345), and/or Easement(ADL 123456)number. Item 20: Report measured depth and true vertical thickness of permafrost.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation:Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results,including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only RECEIVED GLACIER SEP 13 2017 September 13th, 2017 AOGCC Mr. Hollis French, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 Re: Well Completion Cook Inlet Energy, LLC: West Foreland#1 Permit to Drill NO: 161-049 API No: 50-133-10028-00-00 Dear Mr. French, Cook Inlet Energy(CIE)hereby submits a Well Completion Report for the abandonment of West Foreland #1. The work performed was covered under Approved Sundry 317-350. CIE requests the official status of West Foreland#1 be changed to P&A. If you have any questions, please contact me at(907) 727-7404. Sincerel Conrad Perry Sr. Vice President Cook Inlet Energy, LLC (a Glacier Oil & Gas Corp. owned company) 10-407 601 W.5th Avenue,Suite 310,Anchorage,AK 99501 (907)334-6745*(907)334-6735 fax • • • West Foreland #1 Daily Operations Summary API: 50-133-10028-00-00 PTD#: 161-049 Date Activity 09 Aug 2017 RU slickline. Test lubricator to 3500 psi. RIH with 1.88" GR to XN Profile at 9459', POH. RIH with 2 3/8" PXN plug and attempt to set plug, no go, POH. RIH with 2 3/8" brush and work tight spots down to XN profile, POH. RIH with 2 3/8" PXN plug and set plug in XN profile at VN t 9459', POH (PLUG#t1, isolates bottom perfs below tubing). RIH with V ,-0� prong and set prong in plug. RIH with 2 3/8" shifting tool and shift sliding sleeve open at 9291', POH. RD slickline. 10 Aug 2017 Rig up and pump 1 gallon of cement down chemical injection line. 15 Aug 2017 Rig up cementers and pressure test surface lines. Pump at 4 bpm with 8.3 ppg water and catch fluid at 45 bbls pumped. Establish injection rate at 2 bpm, 1850 psi. Prepare for mixing cement. 16 Aug 2017 Mix and treat water for cement job. Tubing, IA, and OA =0 psi. Mix and pump 10 bbls (31 sx) of 13.0 ppg cement down 2-7/8"tubing and through sliding sleeve at 9291'. Displace with water at 2 bpm, 1500 psi. Pressure spike at 44 bbls of displacement, slow rate, attempt to squeeze cement. Max pressure of 3000 psi reached at 47.5 bbls displacement. CIP at 07:35 (PLUG #2, cement pumped between packers). Wash lines and rig down cementers. RU cementers on 2-7/8" tubing and pressure test surface lines. Pressure test tubing to 1600 psi for 30 mins and chart same -good. Pressure test witnessed by AOGCC Rep, Lou Laubenstein. RD cementers. 17 Aug 2017 RU Eline and pressure test lubricator. RIH with 1-9/16"tubing punch guns, 4 spf, 10 shots, 0 phase, and perforate from 7073.7' —7076' MD. Good indication of shots fired, POH —all shots fired. RU cementers and pressure test surface lines. Tubing= 120 psi, IA= 0 psi (well out of balance). Pump 10 bbls of water to confirm injection at 4 bpm, 740 psi. Mix and pump 12 bbls (36 sx) of 13.0 ppg cement at 3.0 bpm and displace with 37.4 bbls of water at 4 bpm. CIP 13:10 (PLUG #3, placement of cement on top of top packer). Wash lines and rig down cementers. 18 Aug 2017 RU cementers on OA (7"x 9-5/8" annulus) and pressure test surface lines. Pump water down annulus at 2.5 bpm and catch pressure at 20 bbls away. Attempt to establish injection rate at 0.3 bpm, pressure 2IPage • • • climbed to 2000 psi—unsuccessful. Bleed off pressure. Attempt injection at 0.3 bpm, pressure increased to 1464 psi, stop pumping. Pressure held, loss of 12 psi over 30 minutes. Unable to inject. Notified AOGCC Representative, Guy Schwartz, of inability to pump • cement down OA.permission granted by Guy Schwartz to conduct top job once wellhead is cut.) IA and OOA remained 0 psi throughout. 19 Aug 2017 RU Slickline. RIH with 1.95" Blind box and tag TOC at 6250' KB, POH. RD Slickline. 23 Aug 2017 RU Cementers on OOA (9-5/8" x 13-3/8" annulus) and pressure test surface lines. Pump water at 0.5 bpm with pressure increase after 3.5 bbls away. Attempt to establish injection at 0.3 bpm, at 3.9 bbls away pressure = 1376 psi. Stop pumping and monitor pressure, loss of 51 psi in 30 minutes. Unable to iniect. Notified AOGCC Representative, Guy Schwartz, of inability to pump cement down OO,1(Permission granted. by Guy Schwartz to conduct top job once wellhead is cut.) 24 Aug 2017 RU Slickline. RIH and set AD2 stop, G packoff and A stop at 595'. MU 1- 9/16"tubing punch, 4 spf, 10 shots, 0 phase and RIH to 595'. Mechanically fire tubing punch from 590.3'—592.5' KB, good indication of shots fired, POH. Confirmed all shots fired. POH with A stop, G packoff and AD2 stop. RD Slickline. 25 Aug 2017 RU cementers and pressure test surface lines. Prep and mix 15 bbls Viscous polymer pill. Pump 2 bbls of water down tubing, taking returns through IA, confirm circulation. Pump 15 bbls of viscous pill and displace with 1 bbl water. Wash lines and RD cementers. RU Slickline and set AD2 stop, G packoff and A stop at 198'. MU 1-9/16"tubing punch, 4 spf, 10 shots, 0 phase and RIH to 195'. Mechanically fire tubing punch from 195'— 197.2' KB, good indication of shots fired, POH. Confirmed all shots fired. POH with A stop, G packoff and AD2 stop. RD Slickline. RU cementers and pressure test surface lines. Pump 1 bbl water to confirm circulation. Mix and pump 35 bbls (142 sx) of 14.5 ppb cement until returns at 14.2 ppg cement. CIP at 22:00. Wash lines and RD cementers. (PLUG #4—surface/top plug). 30 Aug 2017 Excavate dirt from around cellar. Pull cellar. Continue excavation. Prep area for welder. 31 Aug 2017 Finish excavation. Attempt to cut wellhead. 1 Sept 2017 Attempt to cut wellhead. 3IPar, e • • • 2 Sept 2017 Remove wellhead. 7" and tubing drop 6.5ft and 5.5ft, respectively, from cut. Cement confirmed in tubing and IA. 3 Sept 2017 Utilize%"tubing and work to 28ft deep in 9-5/8" x 13-3/8" annulus. Work 3A"tubing to 17 ft deep in 7" x 9-5/8" annulus. Mix and cement 9-5/8" x 13-3/8" annulus with approx. 6 cuft of cement. Mix and cement 7" x 9-5/8" annulus with approx. 2 cuft of cement. Prep for plate weld. 5 Sept 2017 Receive verbal approval from AOGCC Rep,Jim Regg, to weld Abandonment plate on well. Provided photos of plate, cement at top, depth of cut from original ground level, and video of cement competency. Weld Abandonment marker plate on well (final depth of plate at 59" below native soil/original ground level). Send photo of welded plate to Jim Regg. Receive verbal approval from AOGCC Rep, Jim Regg, to back fill hole. 6 Sept 2017 Back fill hole and level area. 41Page • i West Foreland#1 Final P&A Schematic 9/13/2017 -,a1 FOREST OIL CORPORATION WEST FORELAND#1 SINGLE SELECTIVE ELEVATION: 90'KB GL=78' • 1 35 bbls of 14.5 ppg cement pumped E —4 Tubing Punch @ 195'-197' E u '; Viscous Pill $ Tubing Punch @ 590'-592' u 3 ID N Methanol Injection Mandrel 2,939"w/114"Control Line N ti 13318"54.5#J-55 0+1_1,945'NAD/TW 0 0 c LI O. 0 I' I- '^Note: The follow ng are some old test pe:rfs that have been squeezed oft: 7370-90,7440-42, 766+3-88,8505-26, 8918-20&9042-62 • 3% KCL Completion Fluid Al 9 518"36-40#J-55/N-80 a+1.7,360"MD/TVD Tubing Punch @ e 2 7/8" 6.5#L-80 EUE 8rd Tubing 7073.7-7076' --"'""9' 12 bbls -,' crt .' 2 718""X"Nipple 'i 7,085' 12 bbls of 13.0 ppg ...,0""" cement pumped,TOC ,, =+' Ili-= --i 11— 7"26#Hydro I PKR.§7,095'MD in tbg tagged @6250' rjaZfrdrro , , y_;4---7"26#Hydro I PKR.a 9,221'MD jl 4..---- 3"Model XO Sliding Sleeve 0 9,291 ' upper 10 bbls of 13.0 ppg cement pumped PERF'S 9336.9352' —„ :_`1 rc, !): t•. 6 JSPF � 10 bbls 2 3)8"Blast Joints across Perforations(39.75')a 9,333' TCP on Y Block ,r-.`__. 2 3)8"4.7#N-BC EUE Tubing { cmt 1 111 j? 4.'. 6"Centralizer above Seal Assembly a 9420' ,...„-647,=',-;,:,,-:.. ' .J ..1--7"26#Arrowpak Packer wISeal Bore 0 9,423'MD Lower Pods :,,, 41111C .2 318""XN"(1.875")Nipple @ 9,459' 9504-9524'wiTCP _ Plug set in XN Nipple @ 9459' 6 JSPF "'`-- m ---_ New Bridge Plug @ 9551'MD Old Test Perfs. —''- "a.•.,, . - •' , est e -. ' 1-24,50-70,9,.88-710,10,194-224 '. 10,952-76 --.1—.--z:-',""t '' i''�i �4.L EZSV @ 10,908'currently set 11,044-56 -- 3,}6t: t++;_: EZSV 11,033'currently set 11,074-82 1-;,z--'i1air,h., : EZSV @ 11,059'current) set 11,122-34' 7 • t . - - at surface,260 8 23311 N-80,23#S-95 ,4 ih, 7"26#545 STC rir 6144.11,341'MD r " d ; ay ° } A • ,}f a }� ,,'�(*y�j y 4i` ^O -fir' i, X. �5� {. p�' '�„i‘,,,,,44.,,,--,1°'-‘,.,-;7-7 ..{�T �' � f �• .,.e[5'' y T V F .k. - s , b ��•,�, • ti x. ' • y 'lfGyy #;•�, t Ci . ^ „i 4v , ^ '�: 'y ` y 54 �"M. '' .. • • • ATib''` • • a - 1. ^�.. .. '.'. • ,,#+'; - — door Mir— ';',J0*ter, wl ,... - 1. m y . r Fri '° = r `' r a. e ' a ., +. �l r1, d2� de y ., 4, ` y y w ,a imiffi 'f • , :M ,. : ,,,„,,,.. ...INI LE7-sj,,,,,• ,„: ..,,,, ...,, ,„.. ..,.. .. : , ..,, _ , ,. ,4-- p .‘ i, („<\,,,. , s -/-p --Ir-,„ ki....../ 10 .. ... . ... . „ ...... . , .....,. , _,_ 6 ,?-,,,..:-.„. .. ,• U ,. " .... ..,-,,,,, W E.5T ,. � r sFORELAIW ib .a1w: C,1 4.4:# I . * 0-re, **11 4 C ,i Cr/ r 1. 1 2p,,,..,,,,,.„,,,,,,,,,,,„,„., . n ,., .r,,,,,,4,, , * , , t, , ,,,,,.. .00/sh...? '' e r W • / r . '.w'.� .... a «. ..:.,> , ' d a .. .�H dry .f r ,�FAb.. ��• x� r� o � i2 ' �T -L E . , FCS RE L,jam,_t.) -._... , , ` , , , ...,,, 1 - A ,., ,... ,.,f .,.. p �w - / ' y ,,,A,t,,,.'2'4i,',',,T4,,,' „",,...,,,,i,-..,•,ir'---irole,...,,7,- r ' '46. ..? Ili P.—......- a fY ysr • b a ti . a " Js:E rx 444, ••••:-.:.-,,,-.0.. r�ie" -, nxtu,}tt �/ iv if t • �' �' *. f » ' fl,, -0• I ` . � m ��' '7 4 �.� '7 til „�y II `�Y,,,,f.:,.�O. ' f Q ' ` f'`,..x a .- �,,. • - <+ ` ° t � 115{' ��. 4 /- A A 4';'-'..",, „ p, yy F � t ''".'�<rR� ‘...*'11''4.! tip ,. �, ..5 }1 'fFy :I 0 �' a �fl t - h3r,• ,rj fi :.•'t ( to ..„.,_+,1„,..,:. I Qr¢. �� I� t ,, .� 1 %) �. � > :"..,;Ir C 'Ff� 'f f�}A y '.tit rraf ' �F t ,.‘,/,,,,,.,,1„,,.,7,,,,,,, »�f ,. 1(' .:,d� i5t�- i ay,ai t� .A i dp I t f ' oy:fl ;. '..r4:,,,,,%,"",4 ,to "'I rrtif. ; , .4 ,I • ,..t.„ .-. o'r r.' ,Y s11.4 ' f 2 d" ,�.^. c°jar r ' o n° tr4 . , t a i 4 ..+ �r. ," #r � a 0 , ��,. % -- a , , .,, ...,„ 44 �" `�,' ,I. 4 # r t. : ' ' '''''. • orilf. „., Y ' .�f. rr r a6.u''. ` n w b ,/ .,f f •g , :g Ay �17 �l .. � l .' Y f. i+, ,,,t "ti.. � 4s`,.'0:- ...t �., C 'H . , !✓ 'tc ft a ' *.; ,'! (.w'} , :*.e' „,` I ',,, #t+4 11 4 kr' y { '�F rYt.';• A, t.. � z t, fy� rd.yp t !�, �} "e-,1 z ,r / s . • �y 7�, }{ 1 ° `gyp it /,',;1..'":: F p' '#�•b I a�' p lK..� J Y, ti i �. a ^�, fx 6� 1f 3r��! p, i r4 • ` w ..; 1 - r/ } f, Y r y j << 1y ::',4_,:',v'-..• A/i 1;a tf. ,,3:3 �y"� , f•ii �r .t " ,,. t- .>=v�C # 4. _ 3 • r I s. _ if iia x f ,F 4 �: r ^*, A ,. , .e -: 1' • {, r r 1 t t o F a }4� ,i !' ��t�i 3 �4 ', , I','' %`”� • + d t $ .� �1. ` ` i..„"/-1A-0 y,f I 3 F F �"y� �y ',IT. :;-1:.`...-`4,;,..M., 2.4 �TM� 7 V ,{ r ',:',„4-4. .r 9"F Y� � � Y�'r� r {-t rpf rpt"��ml ��Ar }��� �.„�$ r �.� �F p�YA µ', p 3' � ,tr'4v • t 'n.la a � 4� _rr a so,t',1- � , r � )4,4..ik1:3!"41;;T:: �, � } zX�tf �' y � ��r b; }g�,, •it '; 1 �` 3 1 x w 'b. �" 1, .p pm ,/ a /X{ �' s �.. r.,rT l r3Bi • s y r. ! "�� 7g ` iXs 1 ' r Q ';‘li, ' •9 ;'',i.' i , ,. . V • „ .• . , C•1 0 , „, 41.. 4 •° C.T.' ” ' '14,1 °-'' Oh -3, ° ' -A ciN .„ . ,.. . . . , ,.... . kJ) \f‘ tQ \111 .,, , 7 . . ... ' '. ..„ . . '.i 0;' , , ' ,t,• , ,.4 ) ...:, , i• . , 1 i , ' ...„., , I ....',., .e,.. ;:t !4i1 441,14'i <140: 'd.t1.. :A"1 .f- , , ... 0 „ .... . I 1 ' 1 I : i S'0, ,.., . n 1 1 f • ' . . . •,. i ,. ..,,, . ,,,..L •,..,-',.... . .: ,:,,, , . , .1., . • ,,, , ... . ,_,....,...,...,,.. , . : . f‘'. •,.., ,„2,!: i . .1'0:' . , „.- ..„ ,,, , -• • , °t - ',-,,:)! •; i; ii-, t ',.\ .• . ,, . , ,..i • f , ' ' ' '''.• „.'; ' ..`,.,• '' . . , . • • ' , ' , . , • :111,./ 1 !:!„, . ., , .,.. . , . , • 4 ,4 .f 7.4' :A •%. ,' ,,i ,..,4 ..... \ .4'..:•i"".• ,, • ..1 .-- 1'-',X, ....i0 .. 4;7. ' , ' i ,, ' • • ,,' ' -.'14 .'.! 7' ' ° ' -. -• . 144 .ii------...- -, . ./AQ-,... 1 • Pm 1610100 Regg, James B (DOA) From: Regg,James B (DOA) /� qI I (� Sent: Tuesday, September 5, 2017 3:34 PM t et To: Production Field Superintendent Subject: RE: AOGCC Test Witness Notification Request: P &A, Cook Inlet Energy, West Foreland Field,wells 1, 2 and 3 Thank you for sending the pictures. You can proceed with burying the abandoned wells. Jim Regg Supervisor, Inspections AOGCC SCANNED 2 7 zm 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or iim.regg@alaska.gov. From: Production Field Superintendent [mailto:prodfieldsupt@glacieroil.com] Sent:Tuesday, September 5, 2017 3:31 PM To: Regg,James B (DOA) <jim.regg@alaska.gov> Subject: RE:AOGCC Test Witness Notification Request: P &A, Cook Inlet Energy,West Foreland Field, wells 1, 2 and 3 Jim, Attached are pictures of the marker plates welded to the 20" casings of WF#1, WF#2 and WF#3. When I get confirmation from you that this satisfies the P&A I will start filling the holes back in. Thanks and regards. Dan From: Regg,James B (DOA) [mailto:iim.regg@alaska.gov] Sent:Tuesday, September 05, 2017 10:18 AM To: Production Field Superintendent<prodfieldsupt@glacieroil.com> Subject: RE: AOGCC Test Witness Notification Request: P&A, Cook Inlet Energy,West Foreland Field, wells 1, 2 and 3 As discussed this morning,AOGCC witness is waived. Send photos/video evidence showing cutoff depth, competent cement to surface, and marker plate (info, before and after installation). Jim Regg Supervisor, Inspections AOGCC 1 • • AOGCC Memorandum Date: 9/5/2017 To: West Foreland#1 (PTD 1610490) From: Jim Regg ig '116/17 Supervisor, Petroleum Inspections Subject: Surface P&A Attached are photos provided by Cook Inlet Energy (CIE) documenting the surface abandonment of West Foreland#1. Photos show the cut-off depth below original ground level, cement to surface, the information included on the marker plate, and the marker plate welded onto the casing stub. Also provided by CIE was a thumb-drive with a short video confirming competent cement at surface. SCAOR . . 4e. . . , . ' ...`- *,.,',.-44., -.Q: " `„-• - • ., ,.. ,..,•••;:-,..'„:-. -,-, :``'. 4 ,,•447.,,,,,, ,,,,,,li,II..,, ' ..., ,,, ..,„:„.kii—:—A.,,,,,,t4 i 1/, 1 •-•,, 4 ,,.. ,i‘ 7,17„, ------4--` , ' .• • 4, „. -,,, s, i'1. ''4)11,4 .t ,, 2' •. , • '‘,,,,i, ,,- ,,4.',`I. 4., t) ii,t,,,4 if i 4,4 ,, , ',.) r(`,R ' '.4. ''',' •‘':. '''' `14 ' ite ''• ,;1-,7 c„ k " q .; = ire 11 .. t.; • ‘ — 1 , • , ,41. ' 4 ie4 ''') . 4 1 ' N.1 1 ,t 1 'i. t • 1 I ' i ,,-1,., ., . 4,/ :‘-f'tr,4, ,tc, , ; ,, i ' i ' v ' ' ( 'S '.1 =•' ' ,„,i, ,•,1 i...,,• ' ' =•,,„:‘,1 ,•L,' ', r''-F. "!i-11(4, ' ...• . ;4+1'...+."'''+'`• , '.+4 '' '' 1 ; _ Ul FORi . 4.f:';',.. ++ :' •-• '',,... +,.,'' ' ' t'S,- N? ,..`'+'?; A .1 '1,3,%.t,,', .•7- ' 14.. '4,,, 4. ?) „, ,; ^, i,,c,:i l'.,' •-...,,. .... Ir., .. 0,=,• 4, ,1 , ', 0• •0:7-, '' .,r, '44 Ir- . t '' t , 4 .,i i ' r f, ? . ',.. f,''[. '-.1.' !,,,, = • „ °., ., .., 0 1 =r +. ,d 1 -1,# + - al-- -+ 4 ..+. ''11' Ai 4%++''./.1/4,.. ,' :''''t+' 'it' . .. 1,4+ I+ .+‘ ;",+. ,doi , • '* 1,”,.,4 '''"' .,„.-ao - - '':, ti ' '.s:4? ' .‘,., i: 7 ''''-% ,,,- '- , ' •,;' ,-. . : ', ,v;, a I .., , ‘',....14:' f44- '' . : A 't $4-'":.1 4:,' ''•'-4:',.P'. ii it 'r,'''/' 1.\-- . .,....,, ,• , , •'-'`'. -I 01 '4#' •,'''' 'i 1.,-', • 4---) ,,,„ ,,1 `, ''', ,.. 1 'j , ' ' ''' ' ' ,.., ..4' / , , ,,,% , •;,--, st. t ,'',, '4,,y. T` i'....°'-' ' * = '' ‘,- ,' -*' ",,= l' •'/,,i' ..,_ ° .44-„, ,r1 ' , I 4,-4 ,r•' ',‘," =' .,,- .`414 , „'. . ' .., , A",:. , :,e, t:, , , ,I;;;. ,,,,.:, •:,..,,, . k 7, 4''': '' ''4 ' 4 .. .. i ( ‘; 141 ..':' +:+7++ , :*++1 . .'....' ' 11% P' " '', ,•''\lk.'44 i i,..•rz://::::7:„.,;,;: ;-, , , 4.)'4;°°' '. / e.- ,' '',It'''''' .,.,-d '''''''4.'.1`• 1 Jr, : , , •' '"'PA* ,yr 44,-.0 4' °•.' ' ,,,,, ' 1 ,I.,)'`, , . r , , , ',' •°=°'- r . .6 .4'. .1 ..74 -'," , , • '• ,, ; ,,f, k .1. ," i ' i I - ' 44 Oii' 'i I ill * , , , ,''' .1 '' ' 4 .7- if i‘.‘' .'4,?e .'t, f''',L,-,.. 1' , 1' ' - ;i ,,.,. i '. :,,,,. ' ':4"'''.,, /1,'" i-.,.-t. pr.,,,c ., , ' ., 4, .' ------,ar --- :.1.'i:i, q?", '' -; /,''' '11:::/le,..7"-1 ,;,/,i44); '' - „i''' ' ; 1-• i Aii-141 :•`', ' '''''',.-' .?. ....., ''', •I'i,":1"-;,-,';':e; 4,,,..-,,;4..,t,'„,#, ...-',-;:t.',1'..,',',,47,:!,-;t4.4t i 1,,,,, „,,,.. , , . i ., ,,,,., , .,,, .,,,- ,,,,, tl ,. ,..; . ' t, '4n .,;,v4 ,. ,,•,, „Lt.,..4.7 ,r- t„, ;.,. . ,t 11' ;4"/3";'/' ,4„ale ' Ae!''' ' . "'kill?: ' 1 ., ::: *It, 4,4%.,„,-It,,,,, ' ,.'-7,'' ., •itt,:, ,,,.,,,: ..,''' ,:, ,, , ',.',1,,,;74 , ,,,'''''',,,' - ,,,,,' 7 ,--,,,f • , ., - ; . '`.,''': ,.,;,',(.114....,,, ,r.°,'';,) .'; 4'..h, ,l'';',' ',1‘. ' .... , ,,,.,w,,.. v ,7•1,p,t,„ ,y'7_4,,f„=4,9,•",° A 4 4 „ •• r tt, 1.4,4,, , ""'„, 0Y-V.; ••d=''; ,,f 4 ' .4, ,i'Pc;r1 tq!''''' ''i '' ,, ;,. ,koke " , N. ,. . ,,,,„.• ...i: = ' ,,4' ,' ' ," „ .--t" " - ," / , ' ' t•,N'''';* . / ""; :' ,,,,:o.; /I ..,/"/ '.. ' .7„ --ks';''''..•.,,„ " A.‘,"`' i. ' . Q ',.4 ‘ / ', ' '/..1 C': ;' ' ',.'' ' 'dtti,,,,, / , '';,. A` ''•4$1,f( ', ' ;',, ,A-__. • .=-1,1 I-11;t411,h...),, ,5,:: ;",-W,t.!.;'','`,`,4;1".,*,...'i i,i',i'.' . ::,:',.„,c.'t..c,,,..,,/#`•1,,4,,,,,.'.+-,,Vj1.0.„,;,,•,,),, i., ,.,i.t.„,4,..i,,:;f',4,,,i1.t,,,',,..•,(1"",,..,',•,=;$,•.0'8',:1','.''-iif,.,1,f,'‘.,A4,‘..,,'4.v,i1z3,....,.i4,i.'v,..,:,i.,,:,,..'!....,'•.-,4 44'4'.1`..,y,A,i:.;-?•,.'1/.',.',,',1' ,. "1 ' 4 -*, • i ,, ',..,....,;;;,,,,j,,,, , ,,..,,' .,,t,!1,,,/,' , , . ,, ,. ,„...,1A.,;;,•„7,,,, ...,71.4:4;,-,°; :,.., •. ,. 41;,,.,''' ‘'''' ,,,J;51,..' ,,` ti.,, ./ ,,,`;‘,.,,,,,,`,.....t',,,.,... :,*:, , '..,:: ., 1„;1) ' ..i.., .'"i '''.:4/41.3. ‘-?,•A'''.14.44,/'r 1,. ; ...-.,;1 '... - . .. I .. .'•'' ,,iki.', ,,'' ', '..12,,, .;,.',,,,I. ,„°I°::=„P'„...i,v41' a';''''' ,:=••,,° ' - ' '.. ''',1' • ''''• **: ' 016' . . ..... ..0.,. , ,I, : 1.04 • A , •, 4. .4,,. , ,,,,,, ,,,,..:1,, ,.. 4 .4„ ....0.,,, •:-..,; .. : . f ........,,..„,--, , .., ‘, , if,‘„,..,-, ;4: .a,,-- , :.,..-c,::- •• • — ..., -,,,,-"Iv4e,-V.4,4* ,', -'71 . .' : - ).,,s....,...., . , „. .,,..;:r- .:,...,.,,,,,,...„, .... . , * *X ,'"-z .4",., ',' :"..., " . '. .' ')P.."''''' *lit .,,.• ' , .. '. ''..* ' .2 r""iT•tr,,: *".. "."'""(Zik",,4ii.;' `,, '' t I-ttNtrie, • j't'' ''' ''.— • .',/' ' t '1"f• '"'"C- '**Aie-'` St' '•*—''' ; .. ' ily, ' . ' 1.,4, i ' 0.,:,' '' ,.' i;'• • ,.."'",, ./.413,,4 LI,N,fnt.0 ' 'L',h110* ' - .4-, ',''`' i ,40., ''''•''• ' "V"' 11....,k d,.. ,i'.th....-S ..,.. ' „•!,,,. •3.,.1A,,...,7,4 -,:..i-*#,At .n ` • '-'. .!,s.c 4,-...... ,-. t--,,,,-;4-tv',..--.0 .. . '•-•''.if,'"..',.A i ' s.;A'''.':i•!;.:'','-'1'.1r74. . / , ,"/,"•*1- ..,-."4'• ' ' -A'N'it",`*,-.,,o7p,:.r.re•I''',-v" --1.;',-',6,,i't`;'1'707•,'"'”,.ix."—'- '''',•:-'• •:;', ''-''..Airt•'-,7' Ar•r•- :9-7 „•;;`•., .4 - •0: ."•..,..;...trft,.•"..".-.-••"*.t..• ,..,0.• • ,.4-.• „pr.-. -4,4,0.4 . •.:' .4.4.: . .4:.,..,,,.;•-,-,41 --ff flt.,.,•,,,_,4 ,/ k., ,,,,-. - . e',,.(1r..,, ,.t .' , w..,„',•,fs :,.7,4„,.--i4--,,,,.„.•:4.,:..!„,4,. .,,,,:,:,. . .,„i.,.4;„ -.„....,10,,•,,,,,x 2,..,,:,,,,:e.7.4r;e4,.,..,,,,.;,v.40,5•44-..-A,. 4.,!. i.7,..r. .......• - •. ..k..::,.•54.:.„.-?' .---'4411,`.";,,,",.... .-- . -..„.,-„-,'- ,,•-•-7w7,4%.•:,..,!•';`/:4•:•'‘,41.,,tf."4:•• ,.• .,...i ,••.;:-..:;„..`-...40-•14,44, •-,4'• ',1V4vq::,..,!:.'7...-- ;;;A, .,,,4,,,- ''.,,'.'-' ..,S ,..: ..., :, ' , 44-f. ' ..._ ,..i,-i",,r -..-,,,,i41;,-0„;`•):• ".-;..-f:',',,,',;4!;.,--';',';,:.,,,, '74 ,:. ',,. '...:•,:,:l'-i' :i1A; ,t;',.r..'..t‘ :'.., ,C,'....:','.0.,...:P4,71.;.-4....'xi: ---.- •..'.:1.:e-';f4'., •:;1.f. ,'r-,.,. , . "1../. .'.,. ;'..,iis,2--;".-•4-"ki.;,y4%.-44 '..'• ;',,411:::1;.-4\4:„.'? 1 4,471, ji : ,,,,,. *„..:,,.''.-0,...,.-.4.,...,,I.,,,,.• ,:, •;,,,t . 4%.N.r."4,..4*-11,u,,%...-rt 4,,,,,*,i•-•;,•:- ',, ...:,1 '4.v.-'-';', ..5:77'-',,•''' ' ''' .4110W„..,...k...." '''.',,' • . :'. 4...y:vs4c.:'3,.`tAN7.77,1tr.'N.:V•:-.4.- -. -'-'''' . 4,rt,;;,...•-,.',4,c4.4.0.,,,,AC....7,,?. •• ii,,-;, -,,;,i(4%,''',.Ar..,op„A' its-,1..„." 1 - -.1.'';,,,-i.-'' • ...•,-' , ' • woe••:',:-....',4,°,144: '- :: •-';. -.....,-,e!..,,,k.....-...-4-,..„,— • '....::44;...‘,"-kii,74...V.•-, ,#,,i.:•4,, '. --,..`,:t..,,,"•4,4o.,,,pp,..iint',,,' s--..-1.) ,:t. :‘,;.:::',..:, :: „ , ,..,- , 4.7.---tr.4..., .,....,.!-'r .'. ..1.4 :.' •i..%),,i. f.,--.,7,-..i..,,,,N, . .-.‘,..p;-;-..?44-2,,;;4,--,t!1,,,,-....,,,, '....0.11‘forit, 4.',c--.,-0.4:.4,4-11i;- .4.-':.•:,:. . -' :'.-:' . .. ' '' ' - 7.4-#,...' 4.-/..A1-!•---,..-....A.,,i,'„..'`‘,-t.','s.41;4-,4-sc-i.ci'-',..' iii!' *1 Ali ,;,,,,„ ,..14".h. 4. • ,," • •., ,' ": ., ''''-''.,k,•,7,1,t1:40-ri•,`q:gir,: •,4,1`,.,A,' .., ' :.4,e'W.•. 4,*,fr 4v 4:.,i''''4' i'..';,'V,'',., '' • .. 1.,..-. ..„i-e.--,:7'tr.i:. :'.:.k,.,,,,i, .ii..50,4, .,„,.: -• 10„:„,.., ti-1 ,.....,..„,r,,,..4/0..--t., ..,,,...7 •,, . . ., ., ,• . • . 4.19„..,„., .. .,....„,•,...... ..,• .';‘4.1.44:;:,,, . 1 ,,,,.•1. 4--4X.'1.-......g.-.7',,,P 4'44' '-'••.;•?",,,,,444,-.4;;• •/.'/:.i''' 4r ""*" "' ' ••••''..- '..— -'• '• • ' ' ' — ' . ''' '''•' ' '''''''-.'' ' •',.-•-, ....oit.•740. 4,,,,,,,,,,; :.•{ W6,1 ,i6y*,30;.. ' ' 4* ;r,-'‘,c e"-, 4' ' " * '',‘"«,..45, ' .' ••,,"' , .',.' • .' , .,....',',"." .47,-,,..r.,,, "4-1444V.0.;',.). ..1.-‘,.'...4‘•••r.y.A.,,,A,T1',„,''••• . ,.,'01, :,...d,,•A,"!..-.;;M.,,, '; ' '' .. , ,-. • .„ -, .-,,N.',..pP.,-, •. Itsg,,,r1,„„2%,:.,',..4,..,„*,, --'0,.•.?4,k,,,!` . . . - ‘0-•;1,. -..,-'-':•4 ,'!5•,4;; -':;.'4e.Z14:-`-'7''.11." . . .-.4:''• . ' ..f ,-.....-: 1 , ', .''7" :40kiiiil.,...;,-!•:. .•-•''',f'" .''..e.'1" .1,!•Vir.-i'r 1,4• '' 44.‘,• . -.,. t ..,-,,,s ' ,.14.%,f ,Aik' 4 ., ,•,../. , -r .,...,„..-:, ......... , .,....--, ..,;. 4,,, -,"'4',,,./4, .„.. -......, ..,..,e .1". . -:--, . . ,#%.*). 1;_.:.;,.)4. 4,,,,,. , -;,,,:. -:- , i ..,44:,e,$.-.4',;- -0t..3,Yr, - . • . . ... ,,., ...,„..,„.„,,,,,. ...„. 4,t,... ....,,,, ...4 44 Now. - .• • . . .... .., .,,..,•fr.,. -*-.... ..,. .,.<4,...1.fp .,:,..r. - - .. -...4- .0.:„..-40...-v, ., T , . : . . ....4'.'4•'-•,.14. e. - ' -p .. . . ....,. ... - I • • :-'.:'e• :'",:-;.i,,,c :ilk,' . • .,-...--,- ,,Y 0.-. •"--2, ,,./.-.,` 4110 ., , . ,' . . • tig . ,- , 4, Z., , .:-.. ,, , . ORE LP , . , .,'V.,'!.;•. ,1 :,?,,A .'`I,Vii,:.-,;:41,T*4;.''''' J '.:::"- ,•!' r i, ,,' .i .,, ,;:.''..,,,,,,,,•-,,, ,.-:. J - - 1471k- 'ik= i: - • ...4, ,. . oi...,•,;:; 4.,,, rt...-,...,....-,-,- .- ,..f;2P141';',i'lf"f,•"--.'"• ' ' . './.-;•4., '4•1L,'t '' ' „...„, . • , -' •i ,,,. ......le ..,.. ,4, . ',, *.,,.•, ' . ...;;Y'-.; ! .f.,,,,,'-,v( - '',.•, ' ' S! . icA, ' ,t ' MCM .,-0,!.4 / .. 40, :•.*:.'.1.',4 V. ,,,,k-,!,`'1:, ' ,01 ',.i ,....."!1,1"Iji..4...:::."`,. Srst.„04.1) 0 0 , '. -, ?:4t4,. skili •i•iV''..i., 4' f',.,- ,-, ''',..---, .-,0,4 •,-.0:-, .i..,.6.4. 4,. , .. ,,,,v,., 1,;,,,.,.0 e.../,,,,,r4-4*. ' 1.4.4.*_•. . . ,,.:'P..,".;..,:i•If•,,,,,, 4'4-. 1,0- .. '4'••',$. glinsoma, , ,, r,.; ,„ ....'''. ',$' .',,,,* sr': , , 1,,s.., ,04,...:•-ket.e..," .: ''7•-.',''' A.:-','4;-:-,,iift!'•-'4!A•k '.•.'4;r4 0:' . . I . ,.., ,. 1',4.•)'..`„4,14";,., .0%,•• ,,...„,....„,,,,,,....,444.,...,....,...„....,...„. .,.,.. . -,... 4.„ , . ,.,.... ...4;,;)„,i„,•.--, :•,.w-.... ,ti.,:y....:.. , . . i' ,'• , )10,11'7'.ii-,14,37,:k.:".,,,,,,.,,.' :4; ..,,,,,,, . ., „,, . . • , . . , ...1., ..., ., „,F., . . , ,,,,,,l,p,* ' t.:`,,•„,"',Olvirli-t•4'4 :' „`.. ,.„,-...r4.493,,t, Qf..,,,,,,... . , •..L, ,----,-.' ,, •, 0 !, . -.A.., ., ,' -17.7.4 Pi,:., t, ,.,.,.. .... ..-: , . .i:.. „g:.4":401riiiS:'A'Ari :.:,,-,;'1'4,:v4-1,r, * .. 4.1, . .Vier;"44'• ' ':'''' '' ' '''.4 .' f„*4' x.,.41, i• ,:''' -41. t ',‘ ' tO , ''i ' iig ' ,',4r...,,,,,, ...,;.,, , 10-)• .,:j.,..:4,r.,Itti„ ,.. 4/;,,,,,5.•+,:.;ei, ,'year71 IrAtro,.4.,'t‘4,..ev,,,", ,,'.,„,,,),..47'..:,.,',4,**1;,14,0",,,,,,f,,:a4,,ofal.,,; ' S2 R.t,!,,i•, 't.01.:/1',, ''i.'''' '. th:r,,,7: ::;‘, '",,,,A;',4, °' ','",i4kt ;'1::4". 'IC.'t. ....,', 'O.' },ttit?"..T.:'„.4., ../. "1',,,,{..... .,,;.fp•:, „r•;;;q. '„te.'47;',,,,,,,‘,1,.:*-11,11,1•:!4.,9'•itlt, ''..ii..te'.S.'%;.;-" ,i+W.''11k.,:l' 4''...k trA& •',,c,A''‘, ‘4,,,,liert.4',I44-411.:44,4,7".•,q:4A.41;7-. •: •k ', ,I..."ek .'' .. 4i,If,'At."''' '''',01,7,. .' r.,.',.. 1..: ;,.'llfl'ill)tVPrfrds!"' :),',,,'': ,flt. .4,4'i.'4., ,„ * Ili, e.:4)14,,:',, i`tn.,.,,./.t.t,,.., ," :A(?:- ' ,,,.: r '''''''' ' 11(11'''t''''1411.': »01;°: ii4, ' 4•4 ielY4,.{14i•ro?5,'1E4•:-?,.4.4;:.':''. •'' ;':... ''.40t..t $•*$, .sik)t,e, .` ''' ..;','" '';:§ .:-.101,V!%,4.4,... e- 1r , y....—,,,,,,, ... , rA ,,, . No „i4,,,,V. '.:;,..it•".1.r,ti I',4t;:.% ,Ps':',::,',.if.'..,: e'Y., '4- '0.,,:.'ilL.;•Ire.$4 r', tY AtS,is,4:. 1-00...'! 4 /),...,4`. ,Ftb. f .'11, p .4','4§,.'''''.'r : '• 1'..:,',14e1$4, ..J.-•:'";:itor'f i .4' '''''' ''• .0' 4, '.:", ,', -..,• ';' Iv 444 ak ..0. 4x,''.., .‘.1. 01,,,, .-.„:•,,,,. . .' • .•• 4•• . '' , :-". %,... ' , ..... '1,S''*, ' '. 1' ' ' '...nf',."- 1',:a,‘' . '..rq,-=,. . .v( foti;. ., ..)00-:',„ '`,1',. • 't,r ",'4 ' '+n*r.'Y..,4,N.tkv,, .1;' ,,,.x, it,„..",,..004:74"S-1,'0 ''' .1.0,;!'t,11'4116N:j4.. • ' ' J ,4,4,,t' ' l''''i '177 4 ,-, ,', ,-,, . is,,,,k,..4.. , , ., * .. vo,..,-,..„,,,,,,, ''-',i':iitii.,9,,t,;,,,,:C'91,-.;,-,', 44., '''40..':-$,:/-'„,tir., it-,7r.'3... ,.tftit,,,j- ,t, , ,:l. ,..,,,..4:.1.L 4„„.,,,,i ...,.,:tii.„„„v;•,,, •'s:'.,-4. Au,';,-,„,,'.' ..,-`•:1.,„.i •'io!,• • •ss•,,,, ,`•., ....."•• •- •••41..(N,•:;!',3.;',i,44.,fi,i014,4 -"t,, ,:::....,,, ,,,•'.*". O ' . .,." .af•;:$0.1,1:•.,5,,,'....,' '•• ,,,;•04-4, , ,..,4.*.r.t.v.,.,,4.6 '''-in•I Au ...• ',..:44*-,•;t4A0.'‘'..is'',,-,,4i` 1F 10+0;.1'1:43 ' 4•••;t • 'rs • ...• , 4 "4(-"t:ViA . . ,( .46;4 13.;'. . 1. f'f.' olf. .0. -4• ...' , , •'•'''' l'"' ' ' • ,,i,,, 7-:; Ai--4*.'....-A.,,,1404 4::..- ''''''.. r• '' •' ' -!.6 ;;'.,•,, , ,•..• • '.+:; `F -,• *vy..�� 4"i ".'°S` �` �� h. N. ;4ii w 4' Gl *1 ro * - ` ' * ,1.40...t..,* yv; rkS .: a -,..g.,,,,,,,,,:,--v....- �� 'i ♦ a, (#41'y " , � � � ' � a- , 1 � ...4 '4446.- '-.. M .�„ �' ti.,4-4,,t,,,,,,.., 1, +r �J , >� �r *R": ''� 1.♦ �n!• y � y "; ...0•.-, k''''-'4.%.,;"•.,',,..-....04:••.".,-1-.." ^ � 0w'r ;a ', rr. E �-. �p,+ f• . ,L0�" '''"1,0,47",-:;.'"'-''.;* C � , . ,sks 5 4�"; ` i& :.s. agws s. :, *:::,-::::,,,..'::::,:7; ,',:' el • • • . o - w .. • + .• * •• E 7., - ,,.. ,., .. . , , .. . „:. : .„,,f, • 2, ,.....,4- ,„.., T , p • LD ,,,,,. (0.<,\,,, .. „ , .. ..,.. .., a 40 j62LOA/ c7 .„„.0.‹. .._,,,,,.- ' 6 (Iii W E 5 y Aiv tov...: ' „ ,. , Fo RELD .. : 4# J. ,.,, , la 16, '''''* Cjul 0 A pir-b# -V T ST * i1 ?h. 4 * a 4, ND 41 w� a x s . , 0 rR - � * sw r+»« "✓ , .9a $ p n ck , , b "" l , A A -o • Bart n* Wh. * ¢,' r� 4 .�` max.. «�..+ '� • ,i ra- , . ', Y '+ + 'ate' k a .. , a .. „+.. .41;,,,,,,4600.„. . . 1 .,..,01.._. /1/4,0° .?,.. 40•'"`x'.. Ni,„0".S4rif CiCrTh F cTFFJF- C,.2 RE I.�p\fsA\D �- n A pi .ii•-ik-- - ..., ,..,. . ,.. „‘, , ,s00"..- , . ,.. , ,. ,...i......., ,..c.„,„ ...47 .........., ...,„ lib cli%'- c"):# .,. .. ..,., 4, k * , _ � . w • - w� } > 'art �, x a t • a •x, J S r_ r {fi , 444•'•t,li.4,,•.4;'•,1W,4,'',,.f.,.,'`lOt'.1,'4,',.',,.,.,.,,-,.',' 4 •,}, ' S+' 4 > + '• art• . rN r 4 i v-,..:....,,, yT 4 ,:ill f y_ E a . r� ` 4 .•. - _-,. a .ir. y”"y^ �� e tom ,,, • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg ( 011'1\1 DATE: 8/16/17 61 P. I. Supervisor FROM: Lou Laubenstein SUBJECT: Abandonment Plug Verification Petroleum Inspector West Forelands #1 Cook Inlet Energy PTD 1610490; Sundry 317-350 8/16/2017: I traveled to West McArthur River Production Facility to witness a pressure test of a cement plug on the West Forelands#1 well. I arrived on location and went through a job walkdown with Mike Murray (Cook Inlet Energy). All paperwork and information was on location. This was a pressure test of plug #1 for 30 minutes at 1500psi. The plug is set from 9291-9420ft isolating the reservoir. The 30-minute pressure test passed. There was a failure with the Barton chart recorder which resulted in two tests. I have attached the test chart. Summary: I witnessed the successful test of the West Foreland #1 abandonment plug isolating the reservoir. Attachment: Test Charts (2) SCANNED =as 0 8S 2017-0816_Plug_Verification_WForeland-1_ll.docx Page 1 of—3 • • Abandonment Plug Verification - W. Foreland #1 (PTD 1610490) 8/16/2017 -w . �" ' _rt� _ ► _�,.� Q ---,,,,,_ / - .� , 0 .� \',„ , N\\\N\ L4‘''.%.?4k* '1%1( . ..\``,,,,, N1/4\ \\N\ \\, %. ,,,. _ --. }` Ab'`'�y, t_— ti 1 , tet —-------'- - _ # *.! '" ,., \--N. , \ \\.\\ \ \\ ii Oa _...,,,„.. ... . ‘\,,,,, \ \,s ., - - \ \ r X.4,,,, . '-.'',...14 Ai \ .,\,_ _ _ '33ti� \ -1\ S ' ...... 1 ilo \___\ 0 ...\ _,. o C 1 ^ - 2017-0816_Plug_Verification_WForeland-1_11.docx Page 2 of 3 • H • . . :.--. 6 pt,",041146 ; 4.4***41441444% — , , . .. . _ - ez ,, ,,, .„..s-r-.„.A- . ..-.....,„El.._ Y / VV 2''' .," . -' ti------ :i. -.. G• ' V / 0°\ -- . - - -- ..."' \--- - ...,7 ' ,,.--- , -.a. -----, - _ GI? -- , --- ,. . .. , - 4'. 4, -*. -•-. - '. '--,.A. \ \ . / , ),,,• :, , . , - \ \ \ / , , i_ 00° .--- ,,4., .., , \ L_... --800. N „... ,,...--, \ \ , y ,..., „• . . /tpt, _ , ...,,,,,,4,,N, \ ..\, .,\ v jr\7, ,.,-,,, , r ,,,, :x _.1 \\\\_ _ , .,4. „, ; : 7...././ „Xv,.., it i , --,, ! ' ' ; ' ' -Egiff9 ,, „ \ \ \ \ .,. .. \ \ \ N./ \ ;`v \-• \ \ \ \ \ \ \ \V\-, \ \ \ \ \ \ \ i ' .A 1--:#•---,:.'.. .wl"'•$,/*;\\\,, \ \ ttrio -t----- 01/..)-4-4,- , 8 Cuio 0 c,, , , , r„..." _.,.._..,_,,,._. .. oco , „..,,i-- . „ , „ , if -,---, . 47-7/ , / i di„.,,,, 3,,, , ON 1,1, \ \,...\,--\\---' / i . ,.. , 6 ' ",. r ,, / i i / i / ,, , -- :-... \\\ .,-,.. • „ 0„,_ „, / _ . / --'\\ \\ ' ' • _.„..-- ..t, ,, / • / if N \ \ \ y7//, - X OrF?' '''' \\N '41°4' '''-- f N...,,.., - ---,..,_. ---,.- .__.----- , •. \ ..--- _, __ .. —- _ .,_.„ / / '\,4,,, % ' ”- V - - ----- 7 . ''' /,/ ,-- - \ . ._ /4 N , _...- , - - .. \ ,.... ,.. \\;\ • - --,, i. - VV _ ' - -- -___ -i••--- ____.- 0041-_,.,- . c _. ,. 201 7-0 8 1 6_P lug_Verification WForeland-1 11.docx Page 3 of 3 Th. s� THE STATE Alaska Oil and Gas .? •'►�'s�� 7, of�� Conservation Commission # sr -_ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Z;"7RMain: 907.279.1433 Oi l"; Fax: 907.276.7542 ALAS www.aogcc.alaska.gov Conrad Perry Sr. Vice President Cook Inlet Energy, LLC (1I 17 v 601 W. 5th Ave., Ste. 310 SGANNE Anchorage,AK 99501 Re: West Foreland Field, Tyonek Undefined 4.0 Gas Pool, West Forelandl Permit to Drill Number: 161-049 Sundry Number: 317-350 Dear Mr. Perry: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, late( /);(../(7&. Cathy 7 Foerster Commissioner DATED this?j qday of August,2017. RBDMS (AA AUG - 9 2017 Rc ,j)i D STATE OF ALASKA p7 ' f ALASKA OIL AND GAS CONSERVATION COMMISSION JUL 27 Q 7 APPLICATION FOR SUNDRY APPROVALS 0 20AAC25.280 ,, �jGCC 1.Type of Request: Abandon ❑✓ ' Plug Perforations❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: COOK INLET ENERGY,LLC Exploratory ❑ Development ❑✓ , 161-049 3.Address: Stratigraphic ❑ Service ❑ 6.API Number: 601 W 5TH AVE#310,ANCHORAGE,AK 99501 50-133-10028-00-00 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No 0 ✓ WEST FORELAND#1 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 390368 WEST FORELAND,TYONEK UNDEFINED 4.0 GAS 11. PRESENT WELL CONDITION SUMMARY Total Dgw. Q(ft): Total Dy . D(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): 9551' Junk(MD): 'M L ?le? 9551 9551 3143 10908', 11033', 11059' None Casing Length `�J Size MD TVD Burst Collapse Structural Conductor 84' 20" 84' 84' N/A N/A Surface 1945' 13 3/8" 1945' 1945' 2730 psi 1130 psi Intermediate 7360' 9 5/8" 7360' 7360' 3520 psi 2020 psi Production 11341' 7" 11341' 11341' 6340 psi 3830 psi Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 9336'-9352',9504'-9524' , 9336-9352,9504-9524 2 7/8"6.5# N80 9504' Packers and SSSV Type: Hydro I packer x2, Packers and SSSV MD(ft)and TVD(ft): • 7095'MD/TVD;9221'MD/TVD Arrowpak packer w/Sealbore . 9423'MD/TVD 12.Attachments: Proposal Summary U Wellbore schematic U 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 • Service ❑ 14.Estimated Date for 15.Well Status after proposed work: 8/7/2017 Commencing Operations: OIL ❑ WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑I 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Conrad Perry Contact Name: Amanda Dial Authorized Title: �� Are r.Vice Pre1'ent Contact Email: adial@glacieroil.com G" % Contact Phone: 907-382-0124 Authorized Signature: Date: V COMMIS ON U E ONLY Conditions of approval: Notify Commis ion so that a resentative may witness Sundry Number: 9.1) ,7 /6 Plug Integrity V BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance �j) Other: 1 Phd-a it,e_,-......,......,t- G.-:-5'^ .. c,,,,1_g,.. r lrv1Le...i ,„„,„,k t • Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No kr Subsequent Form Required: 16-107- RBDMS (/t--AUG - 9 2017 APPROVED BY Approved by: *ti,la COMMISSIONER THE COMMISSION Date: 5',/ 7 e �ib/7 'S ' / � 7/0Submit n Form and rm�10-403 Revised 4/2017 Approved applic5tion is valid for 12 mntaleb n ��� Attachments in Duplicate RECEIVED GLACIER JUL 27 2017 July 25th, 2017 A000C Mr. Hollis French, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage,Alaska 99501 RE: Application for Sundry Cook Inlet Energy, LLC: West Foreland #1 (PTD 161-049) Dear Mr. French, Cook Inlet Energy, LLC, hereby applies for a Sundry for West Foreland #1 well located on ADL 035017, requesting to permanently abandon the well, leaving the tubing in place and completing the operations rigless. If you have any questions, please contact me at (907) 727-7404. Sincerely, Conrad 'erry Sr. Vice President Cook Inlet Energy, LLC (a Glacier Oil & Gas wholly owned company) 601 W. 5th Avenue, Suite 310 Anchorage,AK 99501 1 GLACIER 1. WELL NAME - West Foreland #1 Well Summary Current Status: West Foreland#1 is shut-in. Current Perforations: 9336'- 9352' 9504'- 9524' Scope of Work: • Check tubing and all annulus pressures.Verify well is dead. • Rig up slickline and test lubricator to 3500 psi. • Abandonment Plug#1: Set plug in XN nipple at 9459'. • Open sliding sleeve at 9291'. • Rig up cement unit, establish injection rate through sliding sleeve. • Abandonment Plug#2: Bullhead 9.5 bbls 12.5 ppg cement down tubing. • Abandonment Plug#3: Bullhead 210 bbls 12.5 ppg cement down 13 3/8"x 9 5/8"annulus. • Abandonment Plug#4: Bullhead 132 bbls 12.5 ppg cement down 9 5/8"x 7" annulus. • Fill control line with cement to mandrel at 2939'. • Pressure test cement/tubing to 1500 psi for 30 mins and chart same. • Tubing punch at 7090'. • Abandonment Plug#5: Circulate 7 bbls 12.5 ppg cement down tubing and up annulus, placing 200' cap on top of packer at 7095'. • Pressure test cement/tubing to 1500 psi for 30 mins and chart same. • Tubing punch at 200'. L__ 111 • Abandonment Plug#6:Circulate 10 bbls 12.5 ppg cement down tubing and up annulus,placing 200'cap at surface. • WOC. Check well dead on all valves. Remove tree. • Recover cellar. • Cut casing 3'below original ground level.Weld on ID CAP. • Backfill pad to grade. General Well Information: Reservoir Pressure/TVD: 4095 psi @ 9524'TVD /9524' MD (PBTD) MASP: 3143 psi Wellhead Type/Pressure Rating: Vetco Grey- 5000 psi -Wellhead&Tree Z (cow"; 74e toy iecr- wG(� 41 not ,r0) fig c r DO�' t✓4e4 !� 2 • GLACIER BOP Configuration: Lubricator Well Type: Gas Producer Estimated Start Date: August 7, 2017 Drilling Manager: Drilling Engineer: Production Manager: Conrad Perry Stephen Ratcliff David Kumar (907) 727-7404 (907) 433-3808 (907) 433-3822 cperry@glacieroil.com sratcliff@glacieroil.com dkumar@glacieroil.com Program 1) Give 48 hours' notice to AOGCC for plugging ops. 2) Check tubing and all annular pressures. 3) Rig up Slickline. Test lubricator to 3500 psi. 4) Set Plug in 2 3/8" XN nipple at 9459'. 5) Open sliding sleeve at 9291'. X 744 Z 0CS-75 etly 6) RD Slickline. /{6 7) Rig up cement to tubing. Test lines to 2500 psi. 8) Establish injection rate with water into perfs below packer at 9221'. a. Monitor annulus pressures. z� , 9) Pump 9.5 bbls of 12.5 ppg cement and displace with 50 bbls of water.o)05-71' to,4a. Estimated TOC inside tubing-8700'. '-D - 10) Rig up cement unit to 9 5/8" x 7" annulus. Test lines to 2500 psi. Oh, 11) Establish injection rate with water. Max allowable injection pressure is 150Q psi.. 12) Cement 9 5/8" x 7" annulus with 210 bbls of 12.5 ppg cement. - ez`t7 Gh//f \ ) 00tk 13) Rig up cement unit to 13 3/8" x 9 5/8" annulus. Test lines to 2500 psi �tyvy 14) Establish injection rate with water. Max allowable injection pressure is 1500 psi. 15) Cement 13 3/8" x 9 5/8" annulus with 132 bbls of 12.5 ppg cement. t at4 16) WOC. 0 517 iPF) 17) Test tubing and cement plug to 1500 psi for 30 mins and chart sa e. 18) Rig up Eline and test lubricator to 3500 psi. f -. /Vcf. 19) Perforate tubing at 7090'just below X nipple at 7085'. 20) Establish circulation down tubing up annulus. 21) Pump 8 bbls of 12.5 ppg cement, displace with 39 bbls of water capping packer at 7095' with 200' of cement. a. Estimated TOC inside tubing-6800'. b. Pump 1 gallon cement into chemical injection line. 23) Test tubing and cement plug to 1500 psi for 30 mins and chart same. 24) Rig up Eline and perforate tubing at 200'. -- jr, l• I-I •-l: "Tee- 7-63 . tnyea ' 3 t GLACIER 25) Establish circulation. Pump cement until good returns to surface+/- 10 bbls. 26) Rig down cement. WOC. 27) Nipple down tree. 28) Dig out to 8' below original ground level. Ensure grade is sufficient to allow safe access for welder to cut casing. 29) Cut casing 3' below ground level. 30) Top off all annular space with cement if it is not to surface in all casing strings. a. Take pictures of cement at surface in all strings. 31) Install well cap as follows [Regulation 20 AAC 25.120]: (1) is constructed of steel that is at least 1/4 inch thick; (2) is welded to, and covers,the outermost casing string, including the conductor casing; (3) does not extend beyond the outermost casing string; and (4) contains the following information bead-welded directly to the marker plate: (A)The name of the operator that plugged and abandoned the well; (B)the number assigned by the commission to the Permit to Drill (Form 10-401) for the well under 20 AAC 25.040(b); (C) the name designated for the well by the operator under 20 AAC 25.005(f); (D)the API number for the well, with any suffix appended to the number under 20 AAC 25.005(f). COOK INLET ENERGY 161-049 West Foreland #1 50-133-10028-00 32) Take pictures of casing stubs with cement,welded cap, and final after grading pad. Submit to town for inclusion in final report. 4 02/24/2006 14:15 FAX 907 258 8601 FOREST OIL ALASKA - TED FAX Cdj001 FOREST OIL CORPORATION WEST FORELAND#1 SINGLE SELECTIVE ELEVATION:90'KB Date:12/21/05 GL=78' Modified by Ted Kramer Methanol Injection Mandrel @ 2,939"w/1/4"Control Line 13 3/8"54.5#J-55 @+/-1,945'MD/TVD **Note:The following are some old test perfs that have been squeezed off:7370-90,7440-42,7666-88,8505-26, 8918-20&9042-62 3%KCL Completion Fluid 9 5/8"36-40#J-55/N-80 @+/-7,360'MD/TVD 4 2 7/8"6.5#L-80 EUE 8rd Tubing X, 4 2 7/8""X"Nipple @ 7,085' 4,, 1 4— 7"26#Hydro I PKR.@ 7,095'MD .1--7"26#Hydro I PKR.@ 9,221'MD SS 4 3"Model XO Sliding Sleeve @ 9,291' Upper PERF'S 9336-9352' — rcp' BJ r-- 6 JSPF 2 3/8"Blast Joints across Perforations(39.75')@ 9,333' TCP on Y Block 4 2 3/8"4.7#N-80 EUE Tubing m 6"Centralizer above Seal Assembly @ 9420' 7"26#Arrowpak Packer w/Seal Bore @ 9,423'MD Lower Perfs X 4 2 3/8""XN"(1.875")Nipple @ 9,459' 9504.9524'w/TCP 6 JSPF — Tc New Bridge Plug @ 9551'MD Old Test Perfs. r = —'— • • est `e s.9 1-24,50-70,9,.6' 10,10,194-224 10,952-76 EZSV @ 10,908'currently set 11,044-56 ragsrfar EZSV @ 11,033'currently set 11,074-82 " 4' EZSV @ 11,059'currently set 11,122-34' 7"29#N-80 BTC at surface,26#&23#N-80,23#S-95 7"26#S-95 STC @ 8144-11,341'MD Proposed P&A Schematic 7/18/2017 4.1. FOREST OIL CORPORATION WEST FORELAND#1 SINGLE SELECTIVE ELEVATION: 90'KB Date:12/21/05 GL=78' Modified by Ted Kramer • I I j Tubing Punch @ 200' Methanol Injection Mandrel @ _Ai .i 2,939"w/1/4" Control Line 13 3/8"54.5#J-55 @+1- 1,945'1VID!TVD ote: he following are some old test pc-fs that have been squeezed off: 7370-90,7440-42, 7665-88, 8505.26. 8918-20&9042-62 , , 3% KCL Completion Fluid 47, � lA 9 5/8"36-40#J-55/N-80 @+1.7,360'MD/TVD Y + 2 718" 6.5#L-80 EUE Brd Tubing 2 718""X"Nipple ft 7,085' Tubing Punch @ 7090' j ,:.:1 : 41— 7"26#Hydro I PKR.@ 7,095'MD .,. .. '-e---7"26# Hydro I PKR.@ 9,221'MD ss f- 3"Model XO Sliding Sleeve @ 9,291 • Upper PERF'S 9336-9352' 7,f, s -- 6 JSPF � 2 3/8"Blast Joints across Perforations(39.75')@ 9,333' TCP on Y Block si is 4- 2 318"4.7#N-80 EUE Tubing '_ ..ii LJ "r 6"Centralizer above Seal Assembly @ 9420' . __„ „-':#t7"26#Arrowpak Packer w/Seal Bore @ 9,423'MD Lower Perls s,t 2 318""XN"(1.875")Nipple @ 9,455' 9504-9524'w1TCP Plug set in XN Nipple 6 JSPF ® = New Bridge Plug a 9551'MD Old Test Perfs. - ..__;. — Old est •erfs. • 1-24,50-70, 9,638-710,10,194-224 10,952-76 --- EZSV @ 10,908'currently set 11,044-56 _ _ EZSVI61 11,033'currently set 11,074-82 •,,i,";;;,-;":!';, ___r EZSV @11,059'current) set 11,122-34' it-— 7"20#N-8• `- at eurface,26#&:23*N-80,230G S-95 7"26#S-95 STC @ 6144.11,341'Ml) i ' .4 +��, �. i... 9f 0•.. , TOO8N R014W LAI • ••• r•1° * Oft' I �1• West McArthur M iP• Y , 9v_:River Production •'° 0 $1. Facility t West t • . .„.. ! McArthur 'y... '640' , ( \ + **';.;• 4 t • + i4..., River Unit .,.rc tt 1Tract 1 (ADL $'E �.' ra 1 359111) .10... s '� i . ` ` Vi` •`4 6, { West ,, ', ” _,��+�:, McArthur \lit N.T River Unit of * V' *" " ADL 392210 Tract 2 (ADL i� maims`'..:.t" ' (State 359112) Subsurface) 1 i k' • j14.11 0 ( ; k fl � : \ • \ ' 'd .l1 1 ti I \ 0. % 6 i 1.41 rim dr {' [west Foreland Pad • • . t t r 'a tt N t'►b / ., • # (.. ♦ ' CIRI Lease C-060324 ' .• i`'+ ;�y° Salamatof Surface/CIRI "'•'l Subsurface *.•"+ ' .t t, JAN 2 12015 16 15 1v NWest McArthur River Unit Tract 1 (ADL 359111) (> WF-3 West McArthur River Unit Tract 2 (ADL 359112) 21 22 23 WF 3 Proposed Wellbore I I J � West Foreland Pad I 1 28 27 26 Scale=1.21112 0 1000 2000 3000 ft / ) /- dam/ Davies, Stephen F (DOA) From: Tim Jones <Tim.Jones@cookinlet.net> Sent: Monday,January 05, 2015 9:12 AM To: Davies, Stephen F (DOA) Subject: RE:West Foreland 1,2, and 3 Surface Lease Question Attachments: Map for WF 3 POO New CIRI Lease Number.pdf Steve, I hope you had a good weekend. Here is a simple ownership map that shows the boundaries of C-060324 and ADL 392210 in relation to ADL 359111 and 359112.The surface locations for all the West Foreland wells are from the West Foreland Pad. I looked at that purple shape, queried it, and looked in the legend,and I do not know what it is. It is approximately where the West Foreland Pad is located but the shape is not exactly right. I hope this helps. If you need more detail please let me know. Tim From: Davies,Stephen F(DOA) [mailto:steve.davies@alaska.gov] Sent: Friday,January 2, 2015 5:15 PM To:Tim Jones Subject: RE:West Foreland 1,2, and 3 Surface Lease Question Tim, Here's what I'm struggling with. The map on the left is from my workstation. It shows the surface location of the West Foreland 1, 2, and 3 wells in the SE corner of Section 21. The screen on the right is from the DNR's webmapper application, and it shows Section 21 at approximately the same scale. State lease ADL 392210 consists of the two purple cross-hatched polygons near the center of the section. The orange-colored dot represents the surface locations of the three wells. These surface locations lie within a light purple- shaded polygon. The legend on DNR's map doesn't explain what the light purple shading represents. Do you know what it represents? Does the onshore portion of Section of 21 belong entirely to CIRI with the exception of the two areas that constitute State lease ADL 392210? This shows why I'm hoping that CIE can provide a better land plat for Section 21. 1 e.orel„ f:.xa ,s.p.n-u..asxnrrv:en'nluvuo,16s rr7+:e1,;lAara4.4.WW. (.+.,`$WOO fh t A,r, 4-x.:+ v Elfi n fiFla2 * a nww7•.w.fa.• CE❑ et 't Q t S7 aC41. .+,.. a KV.,;Mw.St«.F..boani m ,F1.•' ilY ( I I/ A 14.44 ., e. .......nn # #NM►; P W • a t., WEST F • ..w, A W FOR: LAND 2 . ' ars, ++� :01 1 i 13 A ' ■ ! 7 ► ■ ~;dt44044,14* , UPI wit Mao Ffr COMM.%WWII" ■ f.' dr r •ORELAND 1 • fc.tt.?fi•+t+''I v.I.E14,]*Y83iY S .-_ f .� N.1 • '-)'' • -, - *el + Y / U 1t1 3 17..:'❑f� _ C, - _ J v WA, aY L� r] ` Fi 'f /lig 147 .T• Al F T 3 i ! 1 Thanks, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Tim Jones [mailto:TimJones@cookinlet.net] Sent: Friday, January 02, 2015 4:14 PM To: Davies, Stephen F (DOA) Cc: Bettis, Patricia K (DOA); Dianna Lewis Subject: RE: West Foreland 1,2, and 3 Surface Lease Question Hi Steve, 2 Thanks, happy New Year to you too! The lease in question, A-035017,was initially conveyed to CIRI on October 26, 1982, and the former Native allotment contained in 3 US surveys within the boundaries of the A-035017 lease was conveyed to the State on October 2, 2009. The BLM managed this lease in trust for CIRI and the state of Alaska until it waived administration of the lease on January 25, 2012. I have attached a copy of the Amended Decision waiving BLM administration of the A-035017 lease. The new CIRI lease number is C-060234 and the State lease number is ADL 392210.The legal descriptions for each are contained in the attached letter. If you have any questions regarding this issue, please let me know.Thanks. Tim From: Davies,Stephen F(DOA) [mailto:steve.davies@alaska.gov] Sent: Friday,January 2, 2015 2:36 PM To:Tim Jones Cc: Bettis, Patricia K(DOA) Subject:West Foreland 1,2, and 3 Surface Lease Question Hi Tim, Happy New Year! While quality checking AOGCC's database today, I noticed on BLM's ACRES website that Federal Lease A 035017 has a status of"case closed." This particular lease contains the surface locations of wells West Foreland 1, 2, and 3. BLM's case abstract for the lease doesn't mention conveyance of the land, at the bottom of the file, it merely notes that the mineral interest ownership is now CIRI= 0.941503 STATE OF ALASKA= 0.058497 FEDERAL OWNERSHIP=0 Could you please help clarify this? Is this now a CIRI lease? If so,what is CIRI's lease number for this property? Could you please provide a legal description for this parcel of land? Thanks, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7`h Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 3 04-,7 QPP�Met -tim United States Department of the Interior vi , o� 9 Via; �y '�� BUREAU OF LAND MANAGEMENT 1 • t• Alaska State Office TAKE PRIDE' 4, 4RCH s 1.x9 INAMERICA 222 West Seventh Avenue, #13 Anchorage, Alaska 99513-7599 http://www.ak.blm.govRECEIVED A035017 COOK iN\ILE 3111 (AK930) ENERGY CERTIFIED MAIL RETURN RECEIPT REQUESTED February 29, 2012 AMENDED DECISION Cook Inlet Region Inc Attn: Land and Energy Development: P.O. Box 93330 Anchorage, Alaska 99509 State of Alaska, Dept of Natural Resources Division of Oil & Gas, Attn: Wendy Woolf 550 W. 7th Ave., Suite 1100 Anchorage, Alaska 99501 Cook Inlet Energy LLC Walter J. Wilcox, II 605 W. 5th Ave., Suite 310 Anchorage, Alaska 99501 Federal Oil and Gas Lease Administration Waived This decision amends the Decision Waiving Administration on Federal Oil and Gas Lease dated January 25, 2012. The purpose of this decision is to amend subsurface legal descriptions and capture in part, actions taken by the Bureau of Land Management as part of this waiver. On October 26, 1982, the Bureau of Land Management(BLM) issued Interim Conveyance 561 and Patent 50-83-0007 for the subsurface estate including oil and gas to Cook Inlet Region Incorporated (CIRI) on lands where the surface was conveyed to Salamatof Native Association Incorporated. On October 2, 2009, the Bureau of Land Management (BLM) issued Patent 50-2010-0004 for all of the coal and oil and gas and 50-2010-0005 for the oil and gas to the State of Alaska(SOA)on lands where the surface was conveyed to Alaska Native Allotees in Certificates 50-97-0273 and 50-66-0510. 2 The subsurface estate including all oil and gas is no longer owned by the United States and the United States has no residual interest or benefit derived from the lease which would justify continuing the federal administration of the lease. Pursuant to Section 14(g) of the Alaska Native Claims Settlement Act, as amended, and pursuant to Section 6(h) of the Alaska Statehood Act, as amended,this decision hereby waives administration of federal lease A035017 to CIRI and to the State of Alaska as co-tenants as agreed upon in the Memorandum of Agreement signed by the SOA, CIRI, and the BLM, and made effective on August 1, 2011 (MOA). The BLM accepted from Cook Inlet Energy LLC (CIE) two Certificates of Deposit in increments of$500,000 totaling $1,000,000 in satisfaction of the bonding requirement under the Bankruptcy Order. The BLM worked with CIRI, the SOA, and CIE to redeem the Certificates of Deposit to enable CIE to file suitable replacement bonding acceptable to CIRI and the SOA. The CIRI subsurface as it pertains to federal lease A035017 located in T. 8 N., R. 14 W., Seward Meridian, Alaska is: Section 16 41.00 acres Section 21 305.00 acres Section 22 2.27 acres Section 27 93.73 acres Section 28 360.00 acres U.S. Survey 4524 Lot 1 5.00 acre Total 807.00 acres. The SOA subsurface as it pertains to federal lease A035017 located in T. 8 N., R. 14 W., Seward Meridian, Alaska is: U.S. Survey 4523 5.00 acres U.S. Survey 11865 35.00 acres U.S. Survey 4522 10.14 acres Total 50.14 acres The total lease acreage for lease A035017 is: 857.14 acres. As of the effective date of the bankruptcy sale in the matter of Pacific Energy Resources Ltd., case no. 09-10785 in the U.S. Bankruptcy Court for the District of Delaware, December 11, 2009, lessees and/or operators pay rentals and royalties for the above lease to CIRI for their portion of the lease and to the State of Alaska for their portion of the lease. As agreed upon in the MOA, CIRI and the SOA entered into amended and restated royalty sharing agreements associated with the A035017 lease in which the U.S. Department of the Interior is not a party. 3 If you have any questions regarding this Decision, please contact Carol Taylor at 907-271-4402 or me at 907 271-4407. ,.,. .::::::j i — Wa n�ve Y noha l J Branch Chief, Energy &Minerals cc: Office of Natural Resource Revenue Salamatof Native Association Alaska Oil and Gas Conservation Commission Bureau of Indian Affairs SOA, DNR, Division of Mining, Land & Water, Attn: Jerri Sansone Regg, James B (DOA) From: Regg, James B (DOA) Sent: Friday, March 26, 2010 1:37 PM To: drilling.foreman@cookinlet.net Cc: DOA AOGCC Prudhoe Bay Subject: RE: SLB Coil Tbg BOPE test Page 1 of 1 .# Your request for a waiver from testing BOPE on Schlumberger CTU #' 1 -due Saturday, 3/27/10 - is approved. If your plans change and work will continue on the well beyond Saturday, 3/27, contact the North Slope office at 907-659-3607. Jim Regg AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 907-793-1236 From: drilling.foreman@cookinlet.net [mailto:drilling.foreman@cookinlet.net] Sent: Friday, March 26, 2010 11:24 AM To: Regg, James B (DOA) Cc: DOA AOGCC Prudhoe Bay Subject: SLB Coil Tbg BOPE test Jim, Currently Schlumberger Coil Unit is rigged up on Cook Inlet Energy WFU # 1 gas well here at WestMac Trading Bay. We will be conducting a Nitrogen lift in hopes of stimulating the well. After our plan forward meeting this a.m. we believe we will be rigging down and moving off the well by noon tomorrow Saturday the 27th. We are requesting a waiver on our BOPE test which is due tomorrow. Please let us know and we will work accordingly. Regards, Don Jones ©i•ilp'i~~ Litl ~rdlnators Dan' one r:d ik Murray. Offi 7~7' Cell; 2973 Fay # 77s ~ 4$ driltln~ f~~~rnan ,~cookinlet.riet 3/26/2010 STATE OF ALASKA .. ~ A OIL AND GAS CONSERVATION CO SION ~~~~~ ' ~~c ~ ~ zoos GAS WELL OPEN FLOW POTENTIAL TEST RE~~IR ~~S Cl~ii~. ~~,, : , , 1a. Test: ~ Initial Annual Special 1b. Type Test: Stabilized Non Stabili C Of Multipoint DST #1 -Conducted 2-21-1962 ^ Constant Time ^ Isochronal ^ Other 2. Operator Name: Originally: Pan American Petroleum Corporation 5. Date Completed: 11. Permit to Drill Number: 0~~ Current Operator: Forest Oil Corporation 3/29/1962 ~~`--Q ~ '- I 3. Address: Pan American: P.O. Box 712, Anchorage, Alaska 6. Date TD Reached: 12. API Number. Forest Oil: 310 K Street, Suite 700, Anchorage, AK 99501 2/2/1962 50-1331002800 4a. Location of Well (Governmental Section): 7. KB Elevation (ft): 13. Well Name and Number: Surface: SE Sec. 21 -T8N, R14W 90' West Foreland #1 Top of Productive Horizon: SE Sec. 21 -T8N, R141 8. Plug Back Depth(MD+TVD): 14. Field/Pool(s): 10,074' (when test conducted) Total Depth: SE Sec. 21 -T8N, R14W 9. Total Depth (MD + TVD): 13,500 4b. Location of Well (State Base Plane Coordinates): 10. Land Use Permit: 15. Property Designation: Surface: x- 190412.32 Y- 2475581.63 Zone- 4 West Foreland TPI: x- 190401.57 Y- 2475632.58 Zone- 4 16. Type of Completion (Describe): Total Depth: x- 190404.64 Y- 2475627.45 Zone- 4 DST #1 using 2-7l8" Tubing 17. Casing Size Weight per foot, Ib. I.D. in inches Set at ft. 19. Perforations: From To 7" 26 6.276 11,341 9,504' to 9,524' MD 18. Tubing Size Weight per foot, Ib. I.D. in inches Set at ft. 2_7/8" 6.5 2.441 9,470 _: 20. Packer set at ft: 21. GOR cf/bbl: 22. API Liquid Hydrocardbons: 23. Specific Gravity Flowing Fluid (G): 9,470 24a. Producing through: 24b. Reservoir Temp: 24c. Reservoir Pressure: 24d. Barometric Pressure (Pa): Q Tubing ^ Casing 171 F° 5223 psia @ Datum 9414 TVDSS psia 25. Length of Flow Channel (L): Vertical Depth (H): Gg: % COZ: % NZ: % HZS: Prover: Meter Run: Taps: 9,504 26. FLOW DATA TUBING DATA CASING DATA N Prover Choke Line X Orifice Pressure Diff. Temp. Pressure Temp. Pressure Temp. Duration of Flow o. psig Hw F° psig F° psig F° Hr. Size (in.) Size (in.) 1 ~ X 24/64 1150 75 3 2- X 32/64 875 75 2 3- X 40/64 525 75 5 4. X 5. X Basic Coefficient ~ Pressure Flow Temp. F Gravity Factor Super Comp. F t Rate of Flow No. (24-Hour) h Pm actor Fg ac or O~ Mcfd Fb or Fp Ft ' Fpv 1 3750 2 5200 3 5250 4. 5. for Separator for Flowing No. Pr Temperature Tr z Gas Fluid T Gg G 1. 2. 3. Critical Pressure 4. Critical Temperature 5. Form 10-421 Revised 1/2004 CONTINUED ON REVERSE SIDE Submit in Duplicate Pc • 4,300 pct 18,490, 5,223 p{~ 27,276,595 No. Pt ptZ Pct-Pt2 Pw p~ PcZ-PuvZ Ps PsZ Pfz-Ps2 DST#1 -Condu 1,150 1,322,500 17,167,500 1,506 2,268,036 25,008,559 2. 875 765,625 17,724,375 1,262 1,592,392 25,684,204 3. 525 275,625 18,214,375 924 853,406 26,423,189 4. 5. 25. AOF (Mcfd) 7,610 Mcf/d Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~~ ~/,~~.-~v*--i Title ~s~~o~ ~ ~-. ~.~eer DEFINITIONS OF SYMBOLS n 8.065 Date f 2 -Z ~ -vS- AOF Absolute .Open Flow Potential. Rate of Flow that would be obtained if the bottom hole pressure opposite the producin face were reduced to zero psia Fb Basic orifice factor Mcfd/ hwPm Fp Basic critical flow prover or positive choke factor Mcfd/psia Fg Specific gravity factor, dimensionless Fpv Super compressibility factor= ~ dimensionless Ft Flowing temperature factor, dimensionless G Specific gravity of flowing fluid (air=1.000), dimensionless Gg Specific gravity of separator gas (air-1.00), dimensionless GOR Gas-oil ratio, cu. ft. of gas (14.65 psia and 60 degrees F) per barrel oil (60 degrees F) hw Meter differential pressure, inches of water H Vertical depth corresponding to L, feet (TVD) L Length of flow channel, feet (MD) n Exponent (slope) of back-pressure equation, dimensionless Pa Field barometric pressure, psia Pc Shut-in wellhead pressure, psia Pf Shut-in pressure at vertical depth H, psia Pm Static pressure at point of gas measurement, psia Pr Reduced pressure, dimensionless Ps Flowing pressure at vertical depth H, psia Pt Flowing wellhead pressure, psia Pw Static column wellhead pressure corresponding to Pt, psia Q Rate of flow, Mcfd (14.65 psia and 60 degrees F) Tr Reduced temperature, dimensionless T Absolute temperature, degrees Rankin Z Compressibility factor, dimensionless Recommended procedures for tests and calculations may be found in the Manual of Back- Pressure Testing of Gas Wells, Interstate Oil Compact Commission, Oklahoma City, Oklahoma. Form 10-421 Revised 1/2004 Side 2 • • West Foreland #1 - 9400' Sand DST #1 (9,504' - 9,524' MD) (2-21-62) Surface BH Gas BH Flowing BH Shut-in Choke Choke Flowrate Pressure Pressure Size Size Q Ps Pf DD (Pf^2-Ps^2) (1/64") (1/64") (Mscf/d) (psia) (psia) (%) (psia^2 x 10e3) 16 16 3,750 3,197.8 5,204 38.6 16,857 24 16 2,250 914.2 5,204 82.4 26,247 32 16 2,750 662.8 5,204 87.3 26,643 24 24 3,750 1,501.1 5,204 71.2 24,829 32 24 5,200 1,260.9 5,204 75.8 25,493 40 24 5,250 926.0 5,204 82.2 26,225 AOF 7,563 0.0 5,204 100.0 27,083 From AOF Plot: y = 8948.1 *x^0.124 (Pf^2-Ps^2) = 8948.1 "Q^0.124 (Pf"2) = 8948.1*AOF^0.124 AOF = [(Pf^2)/8948.1]^(1/0.124) a = 8948.1 b = 0.124 AOF n (Msc/d) 8.065 7,556 8.065 8,470 8.065 6,805 Ave 7,610 From Form 10-421: AOF = O*[Pf^2/(Pf^2-Ps^2)]^n i f 100, 000 M m 0 x N ea .N C. N N a N a WEST FORELAND #1 - 9400' GAS SAND AOF PLOT (2/21/62) O Clean-up Flowrates (2/21/62) • Multi-Rate Flow Test (2/21/62) -----------------------~------------------------' ------------------~---------------~------------~------.----~---------~-------- Least Squares Best Fit -----------------------~- -----------;-------------------~--------------- ------ ~ _--_--- ___-_-_-_-__ -J___________________________________, _______- _-~__-__________-____r--___---_______y__-__-_-_____ y = 8948.1 xo. ~ za ~ Rz = 0.7537 ' ~- ~~ ~ FBHP = 0.0 psia ' ---- O Theoretical Absolute ~ Open Flow (AOF) ' = 7.6 MMscf/d ' 10,000 ~ 1, 000 10,000 • • GAS RATE (Mscf/d) r ~_ From: Saltmarsh, Arthur C (DOA) Sent: Monday, March 09, 2009 11:08 AM To: Maunder, Thomas E (DOA); Seamount, Dan T (DOA); Davies, Stephen F (DOA); Roby, David S (DOA); McMains, Stephen E (DOA); Vllilliamson, Mary J (DOA); Regg, James B (DOA); Fleckenstein, Robert J (DOA); Colombie, Jody J (DOA); Gary Carlson; Norman, John K (DOA); Foerster, Catherine P (DOA); Laasch, Linda K (DOA); longmere@verizon.net Subject: FW: Pacific Energy files chapter-11, it's official!!! FYI. i ('~ `~. ~ ~~ PACIFIC ENERGY RESOURCES LTD. 111 West Ocean Blvd., Suite 1240 Long Beach, California 90802 Telephone: (562) 628-1526; Fax: (562) 628-1.536 Files for Chapter 11 to Facilitate a Restructuring LONG BEACH, CALIFORNIA, Monday, March 9, 2009 - -Pacific Energy Resources Ltd. (the "Company")(TSX:PFE) announces today that it and its wholly owned subsidiaries have filed voluntary petitions for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the District of Delaware. The filing was precipitated by the dramatic decrease in the market price of oil over the past five months. Combined with the Company's pre-existing level of debt related to past acquisitions and poor capital market conditions, the Company's liquidity and cash flow is insufficient to operate its business and invest in its oil producing assets to increase production. Faced with these constraints, the Company and its subsidiaries filed petitions for reorganization under chapter 11 to facilitate access to an immediate source of liquidity as it works to restructure its debt. In connection with the filing, the Company is seeking customary authority from the Bankruptcy Court that will enable it to continue operating its business in the ordinary course of business. The requested approvals include requests for the authority to make wage and salary payments and continue various benefits for employees. In addition, the Company has negotiated a commitment for $40 million in debtor-in-possession ("DIP") financing. The DIP facility wraps and replaces two of the Company's three asset-based credit facilities and is being provided by the lenders of the two credit facilities that are being replaced. Upon Court approval, the DIP financing combined with the Company's operating revenue will provide sufficient liquidity to fund working capital, meet ongoing obligations and ensure that normal operations continue without interruption during its restructuring. About Pacific Energy Resources Pacific Energy Resources Ltd. is an oil and gas exploration and production company based in Long Beach, California, U.S.A. Additional information relating to the Company may be found on SEDAR at www.sedar.com. The Company's web site is www.PacEnergy.com. ON BEHALF OF THE BOARD OF DIRECTORS PACIFIC ENERGY RESOURCES LTD. Pacific Energy Resources Ltd. 310 K. Street, Suite 700 Anchorage, AK 99507 Office: 907-258-8600 Fax: 907-258-8601 David Hall Alaska Operations Manager Main: 907-868-2133 Cell: 907-317-8239 dmhall ~pacenergy.com www.~acenergy.com _ -- -- -- - -- west , r'oreiand 1 ~~~~~ s Pats r1•ne: ~~':'>t' ''f.G! ~~?t'Y4;~?. ~" ~ ~at.~ t,a, g _ . ~:~~:.~.~.-....~.~..,~~... .i~ AI'I'fl st t~R' t^ s ..:~K .. • ...-.-......,......-o~r~.y..~. ..~v... ...•r ~ 133 -l c~a~~ 1'. () ;~~~c '~ ~1',c;t,r^r~, ,~ ~.G.i~~.~____ -tt,`r sLn .rt- aR tt.aC,T ,i. :.u.• .u'. cl ~•. ~F;c ur; .cr-e1~r: c7carl crt: M ac.ur,!a•-t C a.;iib an+ - • -- ~ Y c ,t Satc rcpuircrr.e+t[t) , ~ 11C~C8t at ss.:::cr v %9.5 ~ ~' t~f Si, G70.5 ~ k' of EL, Section 21, T$~, R14W, ii. xsr.. s., a.. u.. ox st.oaa ,xaat~RraY aeward ;Set•idian rr~~+~ .~x. ' I,t top prod, tutcrral rrporteJ aeloer StTCG~otl 21, ~`BN~ R14W~ .~ See Seward. Meridian ~" At total Qepth ; ,,> ' '. Cook Inlet ~ Bas in ,. , She _ . 1•t. riRactz rro. aArr asatrsa 1«. co~xr= aa~ ~., 13. arwTS ~~.- ~ ;, . rwsrsa . __ ~~ ~ ~~ . -: ~.. ~ Alaska ... 1.,. F,TIC 8T1"Dt-Ra ~~~. DArP. T.A. RL,C111.D ' li. DATB C~1sPL. ( t0 Df ro p-vd.) 1S. LLt~,TlOxyi (at, Rt-3, RT, CR, L`T'C.)•" 1 st.Y1'. C,atXOtIY1-D la- 27- 61 2-1- b ~ I •3- 29- 62 ~ ~ 90 ~ ~ - -~ : ~~ _ _ ~ ., . 20, ro.wL arrrtt, xa a :tv .1. PLG0. swtu T.D.. AtD b 2YD !Y atULT1ALS CO?tl•L., .$. JRTL'RV,La . Rur,RY !'041.t ~ - CABLE ?oOLO S01ti 1+twx2• . DRILLCD at 13 , 500 AID' & TilD 947 5 ~ ,_.,.~, ~ 0-13500. _ a ~ , . ..a• rwat~curo !x'rtut.,~,(s), or rt+:s courLUrtox~-~ror'~'~"", t~orxou. KAxx ut- aria rva ~ ... x 9336-9352 Perf . (MIa~ °r-as.t+ra~ interval ~ -svavs~ ~. o -f. Lower Tertiary °' .. ~ z;' n ~ -. .~ + :)~. !I!R rLaC'lttlC ,XA 07'R&R i.AGa MttN ~ ~~~~? yp .. ' - ~`~+ ~.. y,. , I£S, Micra• lag, coil iper GR, Sonic, NeO,t~con, 1?ipmetei•, Cement Bond "Log ~ ~.~'~~~' i~~. ~ ~. .:.. e;~ ,,. , rs+. ~ :, -CaSINf3 xI~RD txnor: a3I a:.~~: s.~ ~ a~n= ,: _ _~ c,siaro su.a ; ~•accnr, La acrra ec~ (Ya aoLS a~sE c~eusxrtxe ^s .. .~~~~ 3 V ~ ~- ~ ~Li.~~ X~j -~ „~ .ww.w.ww+w+w.r.wi. $4 { ,~ t~ ~w~.~.~w..~w.~~.. ~ [ ~Aa ~- ~ 1'M I' ~. aj . +. ~ ~ ~;... ~. ~ ..~ Sk , 5~ 1945 _ +~ ~, ~ - . , 9 5 /8'~ { ~ ~... , . i2 1~4~~ 1 SOO.~~x • ~. on~_-.;, ~ 40.0.E __ 7360 / 1400 sx, ~ ' 7a~ i 2b.OiF .' 11341' ~• g 1 2'~ ~__~~~- «9. LI\E}t I:ECORU 30. •TiBI:tG ItSCO$A , q autx ~ Tur (a~n) ~ ac'rn~v rain) eirKa fi~KSxr• scxatrr tun) aixa usrttt o (aA) 1'~-CKd1t •Mt (~eo) ....,..~.,.....,.......,.._.._. ~ . ....,.,.,~ ......-, ,.w . , ~_r , ..... -....,, .~.... _ j , m..,.. ,...~.w.....,. ........ _ r ~ t !- LRY i1 REf:US ( r' r^a: '- •? it:~~' P' + .~ ~,1°1~- ~~~ Sq .~ {~ 1 , 07fi- ti'2 , Y ,'044- ~o ~q . ~ j 3=• ..C;D. Sxo;. FB.~C: URE, C1~...tE\'T sQUEF<ZE, ETG 10952-7b sq) (1011;-2?4 sq} (9~C=-.-24 s:;j (yoSS-97~1t~};r: } 3x;ss•vaL tut+) A~~c'r~r wan AIx9 ur u,TERr,L t?acD 9550-70 sq) ( --b~~---' _____.1.._._. _ 8915-:'0 sq) {x;505-~~~ yq) (ibtin-RS sq+ ~14 perf~ratQ on ~ w r Qet~ezed 7440-42 sq) (7370-90 sq) (5042-62 sc itic;ne 9336-41 w c =, :> - ~ ~ ~ r~a15~ 1Cin x_ each-mil 1 cnt,Peze /Z jPr, ~..~i-~2 w~4 j. ._~-unit ;~~r~s ~~en~ s ------~~Q~_S~r~ nreSSlirt+ fF~Q pr' i t'vTII t"3Ht,T rno,rr:io~ ;~xo:rt;cTi~x saT:.rt, iI':utring, paa i.Jt, putn to ei:c anrt~t_~ p D-- ypc uJ p~}np) t.L'LL ETATL'a (ProCuciny or -- { -- ~ thut•i~~) SI _ a I+ATt Of TL ST }3O~ L+R .x SF;~ ,t'2t ilti:: S Li. 7 "t'~. F:rlt OfL-88:.. CAK--AICP. N 17Ci-88L_ ~ G,R-OIL R,TI4 1 ... .. 7Y NFOD ~ ~} ` r ~" I. ! - U3 } • ~ 1 a~r i ~~- ~~f~TO 1 L ~I1111 I Lt .. • ~ ~ d ~ ~ SARAH PAL/N, GOVERNOR ~r °~I~7~A O~t ~D ~ J 333 W. 7th AVENUE, SUITE 100 CO1~. FiR~A'1`I011T C011~I~II~SjpR fJ ANCHORAGE, ALASKA 99501-3539 R PHONE (907) 279-1433 FAX (907) 276-7542 David Hall Production Manager Forest Oil Corporation 310 K St, Suite 700 Anchorage, AK 99501 Re: West Foreland Field, Tyonek Undefined Gas Pool, W~St Foreland # 1 Sundry Number: 307-322 Dear Mr. Hall: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days of±er written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considerec'. timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. ,.. , DATED this day of October, 2007 Encl. ~! -~~~ !~E~E.IVE~ STATE OF ALASKA ~I D' ~~ ALASKA OIL AND GAS CONSERVATION COMA ION ~ T 9 2007 ~.~30 C 1 APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Alaska Elii & Gas Cons. Commission 1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Waiv orage Other ^~ Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension ^ Install capillary Change approved program ^ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well ^ string 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Forest Oil Cor oration Development ~ Exploratory ^ 161-049 ' 3. Address: Stratigraphic ^ Service ^ 6. API Number: 310 K St, Suite 700, Anchorage, AK 99501 50-133-10028-00 ' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ^ No Q i West Foreland #1 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): A 035017 ~ 25' AGL West Foreland ~ ,p f 12. PRESENT WELL CONDITION SUMMARY ~p•23'~' Total Depth MD (ft): ~ Total Depth TVD (ft): ' Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk ( easured): ~,~ /~ S~ ~.. /3 ~ Casing Length Size MD TVD Burst Collapse Structural Conductor g4' 20" 84' 84' N/A N/A Surface 1,945' 13-3/8" 1,945' 1,945' 2,730 psi 1,130 psi Intermediate 7,360' 9-518" 7,360' 7,360' 3,520 psi 2,020 psi Production 11,341' 7" 11,341' 11,341' 6,340 psi 3,830 psi Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9,336' - 9,352' 9,336 - 9,352' 2-7/8" N-80 & J-55 9,276' Packers and SSSV Type: Baker Model D, NO SSSV Packers and SSSV MD (ft): Packer at 9,272' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ D velopment ~ Service ^ 15. Estimated Date for 10/26/2007 16. Well Status after propose rk: Commencing Operations: Oil Gas ~,~ vPlugged ^ Abandoned ^ ° 17. Verbal Approval: Date: WINJ WDSPL ~ WAG ^ GINJ ^ ^ ^ Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name David Hall Title Production Mana er Signature ~~ // Phone Date .~ l~.v 868-2133 /© _~ l °~ - ~ ~ COMMISSION USE ONLY Conditions of approval: Notity Commission so that a representative may witness Sundry Number: ~ . ^ Location Clearance ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ' Other: `-~- Q n(~ ~ ^ GCC~~W ~ ~ QsHLa S . v~~ Subsequent Form Required: ~~ APPROVED BY Approved by: OMMISSIONER THE COMMISSION Date: /O• T ~~ l~ l Form 10-403 Revised 06/2006 /~/Su mit i~ pl of 2~ t ~ pJ Page 1 of 1 Maunder, Thomas E (Q4A) From: David Hall [DMHaII@forestoil.com] Sent: Tuesday, October 23, 2007 3:11 PM To: Maunder, Thomas E (DOA) Cc: Davies, Stephen F (DOA); Roby, David S (DOA); Rebekah Haynes Subject: RE: West Forland Sundry Applications ~r ((fl1-v~-~~ Tom, Yes the water production is reported the same from WF1 and WF2 (LS & ST). After the individual wellhead gas flow meters the wells are routed to a common scrubber therefore we calculate water production based off the results when one of the wells was down for what ever reason. For example, in the past when WF1 was down the total water production received was reduced by 1/3. And as a result the total water production received is divided equally between WF1, WF2-LS, and WF2-ST as reported. Please do not hesitate if you have anymore questions. Thank you, David Hall David Hall Production Manager Office 907-776-7108 -868-2133 Ce11 907-3 1 7-8239 Fax 907-776-7119 -----Original Message----- From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov} Sent: Tuesday, October 23, 2()07 12:26 PM To: David Hall Cc: Davies, Stephen F (DOA); Roby, David S (DOA) Subject: West Fo~land Sundry Applications David, I am beginning to review the sundry applications for the installation of the capillary strings in the WF wells. I was curious about the water production. I have pulled the production reports for WF #1 and WF #2 L and S. The water production for all strings is reported as the same: 214 bbls for May 2007, 190 bbls for .tune, 234 bbls for July, 253 bbls for August and 185 bbls for September. Would you look into what appears to be erroneous information and provide corrected numbers? It may be necessary to revise how Forest is reporting production from the WF wells. Is water produced from atl strings? Thanks in advance. Call or message with any questions. Tom Maunder, PE AOGCC 10/23/2007 i .~~ ~. October 16, 2007 • Forest Oil Corporation 310 K Street, Suite 700 Anchorage, Alaska 99501 (907) 868-2133 or 776-7108 Fax: (907) 258-8601 or 776-7119 Mr. John Norman, Chairman Alaska Oil and Gas Conservation Commission 333 W. 7~' Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re : West Foreland #1 Caoillary String Installation: Dear Mr. Norman, E~EIVE~ ~(;T 19 2007 Alaska iii F~ Gas Cons. Commission Anchorage Forest Oil Corp proposes to install a'/" capillary string in the production tubing of the West Foreland #1 well. A foaming agent will be periodically pumped through the string to assist in unloading produced water and condensate from this well. A coil tubing unit will be used to perform the installation. We anticipate the work to be performed on or about October 26. The capillary string will be run inside the production tubing and will extend from the top of the perforations through the wellhead and out the swab valve at the top of the tree where it will be packed off. Should an emergency arise that requires the well be shut in, one of the master valves would be closed, severing the capillary string. If you have any questions, please contact me at 868-2133. Sincerely, /~ ~~ 1~J4 David Hall Production Manager Forest Oil Corporation Attachments: Sundry Application Wellbore Schematic r ~ • KENA1, ALASKA FIELD OPERATIONS Weatherford Completion & Production Systems ~, As-Run Drawin Revlslonc New Page 1 of 2 Operator. Forest Oil Corp. Lease: West Forlands Well No: 1 Prepared by: Mike Gray Company rep: Fred Brent Completion filuid: KC) Perforations: 9336-9352' Sizefint Wt.(Iblftl State: Alaska County: Kenai Date prepared: 11/11!2005 Phone• xxX Phone: 776-7188 Fluid 1Nt: 8.8 9504-9524' Ma +~i~ ID tin) Drift tin) TypelThread CSG . . 7 gook xxx soot BTC, L-80 LNR1 N/A LNR2 N/A Upper tubing: 2-7l8 8.5 2.441 2.347 EUE, N-80 Lower tubing: 2-318 4.7 1.995 1.901 EUE, N-80 No. OD (in ID in Length (ft) Depth (ft} Description 12 KB=4D',GL=78' KB-GL=12'PerTEK 1 2.82 Tubing Han er 3.668 2.441 12,D8 Pup Jls, 8' & 4' 2 3.688 2.441 2908.30 26.90 Tubing Joints 202-296: 3.668 2.441 4.07 2935.20 PupJt 3 2.441 4.27 2939.27 Chemical Injection Mandrel (Nova} 3.668 2.441 4137.43 2943.54 Joints 69.202 3.668 2.441 4.22 7080.97 Pup Jt. 4 2.310 .1,20 7085.19 2 718 X ple 2.31X 3.868 2.441 4.22 7086.39 Pup Jt 3.66$ 2.441 4.08 7090.61 2 7/8 Pup Joint 5 5.960 2.441 8.50 7094.69 H ro I Packer 3.688 2.441 2113.45 7103.18 Tubing,)ts 1-68 3.888 2.441 4.08 9216.64 Pup Jt 6 5.980 2.441 6.5D 9220.72 Hydro! Packer 3.668 2.441 6.10 8228.22 Pup Jt 7 3.630 i.S95 .0.52 9235.32 Xover 3.063 1.995 62.b3 9235.84 iubin jams 2 318 3.063 1.995 4.15 9298.37 Pup Jt; Notes:'If weight is slacked off on packers, enter (-}ft above landing nipple above top packer. This keeps packers 8 landing nipples on Uue depth and compensates for tbg length added for slack off. "If tension is Dulled after landlnkt packers, enter(+}ft above landing nipple above top packer: ~i • Weatherford Completion & Production Systems ~a s to t9 20 21 Revision: New Operator: Forest flit Corp. Lease: West Forlands Well No: 1 Prepared by: Mike Gray Company rep: Fred Brent Completion fluid: KGI Perforations: 9336-9352' State: Alaska Coun#y: Kenai Date prepared: 38667 Phone: xxx Phone: 776-7188 Fluid wt: 8.8 5353-5380' MD ~" Page 2 of 2 No. OD in ID (in) Length ft) Depth (ft} Description Nlp 9290.52 Depth carried from page 1. Ddn'tuse this row, 8 3.000 2.310 2.82 9290.52 Model XO slidi sleeve 1.87 X ~' 3.083 1.995 8.03 9293.34 Pup Jt. 3.063 1.995 31.14 9299.37 2318 Tubing Joint 1,995 0.75 8330.51 Y Block. 3.083 1.995 1.62 9331.26 Pup Jt 10 1.985 39.75 9332.813 Blast Joints 3.063 1.995 16.03 9372.63 Pup Jts 3.063 1.885 31.29 9388.86 2 3!8 Tubin Joint 11 6.000 1.995 0.65 9419.94 Fluted centralizer 12 3.063 1.995 1.65 9420.59 Pup Jt 13 6.000 1.995 0.42 9422.24 Fluted centralizer 14 5.938 3.250 4.75 9422.66 7"x 3:25" ak Packer 15 5.625 0.75 9427.41 Packer Bottom Adaptor to PBR 16 3.370 2.886 2.25 9426.16 PBR extension 17 4.370 1.895 0.85 9430.41 Tubing ado for taattom to 2 3/8 EUE 3.063 1.995 24.16 9431.0(3 2 318 Pup Joints .3.063 1.995 4.18 9455.22 Pup jt 18 2.750 1.791 1.26 9459.40 1.875 XN Ntpple 3.0133 1.895 4.15 94$0.66 Pup jt. 3.083 1.995 4.03 9464.81 Pup jt. 19 0.71 9468.84 VentlDebris sub 3.063 1.995 31.32 9469.55 Tubng faint 23/8 7.19 950D.87 20 20.00 9506.08 Hallitiurton TCP 4.01 9528.06 Pressure firing headlbull nose Cast. iron l}ridge Plug set at 9551' Noses: Entire J IU ~ it t - }} 11x8 1C' (U - ~F •I f~DC.. ,~ ~~~~ ~'i~ ~:: _,~ _ _ ,. _ _ -. _ ~ ___ ~, ~~ ~ ~ AOGCC = r WFU 3 KUSTATA RID E 1 A~ 'V I West McArthur River Unit W Forela u 5 ~ Trading Bay LOCATION MAP Unl z o s V1.' For land U 5A I mile Gas ~ Oil ~-~ Accumulation outlines are approximate. WFU 4 K STATAN Che ron 1 KUSTAT N RIVER 1 ~} WFU 1 ~ I I W FORE ND ST Al MRU 6°`°°WM 5 We ` MC 1 ` ~ ~ W W MRU 3 `iWMRU 3ST RU 1A I WMR fiver 1'l~t W RU 1 A WM6lCJ WMRU 1 WMRU 2 ~ WFU 2 00 z MRU 4 BACHAT A CRK ST1 ~. tiV FORELA ' D 1 I West Foreland Field 15 W 14 W • • Subject: WF #1 From: Paul Winslow <PMWinslow@forestoil.com> Date: Mon, 11 Jun 2007 08:50:42 -0800 To: Stephen F Davies <steve_davies@admin.state.ak.us> stave, WF #1 has been producing from both the 9200' and 9400' sands (commingled) since 4/25/06. WF #1 produced from just the 9400` sand from 11/29/05 to 4/24/06. Let me know if you need anything else. Paul Paul Winslow Sr. Reservoir Engineer Forest Oil Corporation 310 K Street, Suite 700 Anchorage, AK 99501 Work: (907) 868-2131 Cell: (907) 317-8193 _ Fax: (907) 258-8601 pmwinslow@forestoil.com /G /- o ~9 Subject: Forest's Requested Confidentiality for Information from Public Domain Wells From: Stephen Davies <steve_davies@admin.state.ak.us> Date: Thu, 06 Ju12006 15:50:31 -0800 To: JDArlington@forestoil.com BCC: Camille O Taylor <cam~ny_taylor@law.state.ak.us>, Jahn Norman <john_norman@admin.state.ak.us>, Daniel Seamount <dan_seamount@admin.state.ak.us>, Cathy P Foerster <cathy,~foerster@admin.state.alE.us> Jim, Could you handle this inquiry, or pass it along to someone who can? Attached axe transmittal letters submitted by Forest for information from the West Foreland 1 and Kustatan Field 1 wells. Each of these transmittal letters contains a statement requesting, under statute AS 31.05.035, that confidentiality be extended to all information listed on each transmittal. Neither of these wells are confidential. In order fox the Commission to come to a decision concerning the confidentiality of Forest's submittals, the Commission requires a detailed justification for each item as to why it should be considered confidential under AS 31.05.035. Could you please provide these justifications? Sincerely, Steve Davies Sr. Petroleum Geologist Alaska Oil and Gas Conservation Commission 907-793-1224 Steve Davies _ _. _ _ _ _ Content-Type: application/pdf .060706 Forest Transmittal_Letters.pdf Content-Encoding: base64 __ __ __ _. __ ...._. ...._.. Subject: Concerning Permit # 161-049 From: Christine Mahnken <Christine_mahnken@admin.state.ak.us> Date: Fri, 30 Jun 2006 14:11:00 -0800 To: Stephen F Davies <steve_davies@admin.state.ak.us> Steve, A Mr. ViJoy Bongia (1-832-692-1619) called Bob C., concerning West Foreland #1, 161-049. Mr. Bongia would like the perforation study or Completion Report on this certain well. Only one problem, is that I didn't realize it was confidential when I spoke to him a little while later. I told him that it may be offsite, since I couldn't find the file and that I would get back with him Wednesday night or Thursday morning to let him know either way. Bob was listening while I was speaking to Mr. Bongia on speaker phone. Tom, Bob and I are wondering if there is a reason it would be confidential, and when if should be coming back to a shelf near the public? Christine ~ ~,~ ZL'/ ECG ~l ` ~~_ e ~ - ~ ~~ ~> ~ ,c% . ~ r. ~V~ ~~ vL 4~ Gti / ~ ~~~ ~" ~~ ~~ti , Forest Oil Corporat~ n Alaska Division 310 K Street, Suite 700 Anchorage, Alaska 99501 Phone: (907) 258-8600 Fax: (907) 258-8601 DATA TRANSMITTAL EGErVE~ ~~~ ~ 2 2005 Alaska Qil & Gas Cons, Commission Anchorage Date: December 22, 2005 To: John Norman AOGCC From: Barbara Kruk for Ted Kramer Forest Oil Cor oration 333 W. 7th Ave, Suite 100 310 K Street, Suite 700 Anchora e, AK 99501 Anchora e, AK 99501 Phone: (907) 279-1433 Phone: (907) 868 - 2113 FAX: (907) 258 - 8601 TRANSMITTAL DESCRIPTION Well data for West Foreland #1, API#50-133-10028-00 In accordance with Alaska Statutes AS 31.05.035, we request that confidentiality be extended to all of the following information. ~-Printout Report of Sundry Well Operations - 1 page (AOGCC form 10-404) -~ I~ Ld,~;,~. ~, Attachment -Well Schematic Diagram - 1 page ~• ~,~ p;a,L ;t S. 2~ o (.d~ Attachment -Daily Report of Well Operations (Morning Summary) - 30 pages -J ~ ~,, 1-Printout Well Completion or Recompletion Report and Log - 2 pages (AOGCC form 10-407) Attachment -Well Schematic Diagram - 1 page 2-Printouts Gas Well O en Flow Potential Test Report - 2 pa es (AOGCC form 10-421 (Submited in Du licate) l~„~„r,~,( Attachment -West Foreland #1 - 9400' Sand; DST #1 - 1 pa e ~ ~ a,c, Attachment -West Foreland #1 - 9400' Gas Sand; AOF Plot (2/21/62) - 1 page ~s, ~z t al S•o ~1.t~ 60~4C ~2f, z8o(„l\ Please sign below to acknowledge receipt. Received By: Date: ~ - lG >~ ?~ Ys/ a 5 Date Modified:12/22/2005 Transmittals_AOGCC.xIsMIF#1 AOGCC_12_22_05 Date Prepared: 12/6/00 bk STATE OF ALASKA DEC ~, ZQaS ALA~IL AND GAS CONSERVATION COMMON WELL COMPLETION OR RECOMPLETION REPORT ~~~~~ ~Gq~ ~~'ot~luss~+~ 1a. Well Status: Oil Gas ~ Plugged Abandoned 2onnc2s.los GINJ^ WINJ^ WDSPL^ No. of Completions 2 Suspended WAG^ 2oanc2s.11o Other 1b. Well Class: Development ^ Exploratory^ Service ^ StratigraphicTest^ 2. Operator Name: Forest Oil Corporation 5. Date Comp. Susp~or~e~ Aband.: ~~ ~~~<, ~ 12. Permit to Drill Number: 61-49 3. Address: 310 K. Street, Suite 700, Anchorage, Alaska 99501 6. Date Spudded: 2°!3`~~ October 27, 1961 13. API Number: 50-133-10028-00 4a. Location of Well (Governmental Section): Surface: s7s.s' N of SL, 670.5' W of EL, Section 21, T3N, R14W SM 7. Date TD Reached: February 1, 1962 14. Well Name and Number: West Forelands 1 Top of Productive Horizon: 8. KB Elevation (ft): 90' From Sea Level 15. Field/Pool(s): West Forelands 1 Total Depth: 9. Plug Back Depth(MD+TVD): 9,551' 4b. Location of Well (State Base Plane Coordinates): Surface: x- 190412.32 y- 2475581.63 Zone- 10. Total Depth (MD +TVD): 11,341 16. Property Designation: TPI: x- 190402.33 y- 2475659.65 Zone- Total Depth: x- 190375.62 y- 2475673.94 Zone- 11. Depth Where SSSV Set: N/A 17. Land Use Permit: N/A 18. Directional Survey: Yes No Q 19. Water Depth, if Offshore: N/A feet MSL 20. Thickness of Permafrost: N/A 21. Logs Run: GR - CCL ran to tie in TCP guns. 22. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT ~ TOP BOTTOM TOP BOTTOM PULLED 20" N/A Surf. 84 Same Same 26 267 13 3/8" 54.5 Surf. 1945 Same Same 17 1/2" 1500 9 5/8 40 Surf. 7360 Same Same 12 1/4 1400 7 26 Surf. 11,341 Same Same 81/2 1500 23. Perforations open to Produc tion (MD +TVD of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if non~,,state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 9504-9524' Open and producing. 9336-9570' isolated behind sliding sleeve. 2-7/8" 9229 7,094 / 9,221 / 9,423 ~ ~ e ~ ~, ? / h ~ . o/, 2-3/8" F/9235' to 9469 y! 25. ACID, FRACT URE, CEMENT SQUEEZE, ETC. 1~~: tf gZt~D ~D DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED -,•~° None. 1~,~ b ~x., ~~d ®~ • zz ~oS ~ ~ ~'~"fib 26. PRODUCTION TEST Date First Production: December 1, 2005 Method of Operation (Flowing, gas lift, etc.): FlOwln Date of Test: 2/21!1962 Hours Tested: 1/10/1900 Production for Test Period Oil-Bbl: Gas-MCF: 3750-5250 Water-Bbl: 0 Choke Size: 24/64-40/64 Gas-Oil Ratio: N/A Flow Tubing Press. 1150-525 Casing Press: p Calculated 24-Hour Rate ~ Oil-Bbl: Gas-MCF: 3750-5250 Water-Bbl: 0 Oil Gravity -API (corr): N/A 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". Channel Sand containing gas. Re-entry of old well. Zone was originally tested in late 60's. No additional test performed. No Chips. ~c;~~} ~!' ~l ,3N U~v`i'E ~l ~(~' Form 10-407 Revised 12/2003 ) ~'":~ ~ ~~~„ ~ NUED ON REVERSE a8. GEOLOGIC MARK 29. FORMATION TESTS NAME TVD Include and briefly arize test results. List intervals tested, and attach Beluga 1748 1748 detailed supporting data as necessary. If no tests were conducted, state Tyonek 2914 2914 "None". 8500'sand 8014 8014 None. 9200'Sand 9330 9330 9400' Sand 9,501 9,501 30. List of Attachments: 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Printed Name: Ted Kramer Title: Production Manager Signature: /`~ ~ ~ Phone: Date: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 '~ FOREST OIL CORPORATION WEST FORELAND # 1 SINGLE SELECTIVE ELEVATION: 90' KB Date:12/21/05 GL= 78' Modified by Ted Kramer Methanol Injection Mandrel @ 2,939" w/ 1/4" Control Line 13 3/8" 54.5# J-55 @ +/-1,945' MDITVD M **Note: The following are some old test perfs that have been squeezed off: 7370-90, 7440-42, 7666-88, 8505-26, 8918-20 & 9042-62 3% KCL Completion Fluid 9 5/8" 36-40# J-55/N-80 @ +/- 7,360' MD/TVD bi EUE 8 d T " u ng r 2 718 6.5# L-80 x 2 7/8" "X" Nipple @ 7,085' ~ 7" 26 # Hydro 1 PKR. @ 7,095' MD f-7" 26 # Hydro I PKR. @ 9,221' MD s ' 3" Model XO Sliding Sleeve @ 9,291 ' Upper PERF'S 9336-9352' 6 JSPF TcP B.1 2 3/8" Blast Joints across Perforations (39.75') @ 9,333' 80 EUE T bi N " TCP on Y Block u ng - 2 3/8 4.7# m W 6"Centralizer above Seal Assembly @ 9420' ~ ~ 7" 26# Arrowpak Packer w/Seal Bore @ 9,423' MD Lower Perfs x 2 3/8" "XN" (1.875") Nipple @ 9,459' 9504-9524' w/TCP 6 JSPF TcP ~ New Bridge Plug @ 9551' MD Old Test Perfs. Old Test Perfs. 9 521-24,50-70, 9,688-710,10,194-224 10,952-76 EZSV @ 10,908' currently set 11,044-56 EZSV @ 11,033' currently set 11,074-82 EZSV @ 11,059' currently set 11,122-34' •_ 7" 29# N-80 BTC at surface, 2ti# 8~ 23# N-80, 23# S-95 7" 26 # S-95 STC @ 8144-11,341'MD STATE OF ALASKA A~ OIL AND GAS CONSERVATION CO~SION GAS WELL OPEN FLOW POTENTIAL TEST REPORT 1a. Test: ~ Initial Annual Special 1b. Type Test: Stabilized Non St - t DST #1 -Conducted 2-21-1962 ^ Constant Time ^ Isochronal ^ Other ~flC~- ' ~ .;4 2. Operator Name: Originally: Pan American Petroleum Corporation 5. Date Completed: 11. Permit to Drill Number: Current Operator: Forest Oil Corporation 3/29/1962 3. Address: Pan American: P.O. Box 712, Anchorage, Alaska 6. Date TD Reached: 12. API Number: Forest Oil: 310 K Street, Suite 700, Anchorage, AK 99501 2/2/1962 50-1331002800 4a. Location of Well (Governmental Section): 7. KB Elevation (ft): 13. Well Name and Number: Surface: SE Sec. 21 -T8N, R14W 90' West Foreland #1 Top of Productive Horizon: SE Sec. 21 -T8N, R141 8. Plug Back Depth(MD+TVD): 14. Field/Pool(s): 10,074' (when test conducted) Total Depth: SE Sec. 21 -T8N, R14W 9. Total Depth (MD + TVD): 13,500 4b. Location of Well (State Base Plane Coordinates): 10. Land Use Permit: 15. Property Designation: Surface: x- 190412.32 Y- 2475581.63 Zone- 4 west Foreland TPI: x- 190401.57 Y- 2475632.58 Zone- 4 16. Type of Completion (Describe): Total Depth: x- 190404.64 Y- 2475627.45 Zone- 4 DST #1 using 2-7/8" Tubing 17. Casing Size Weight per foot, Ib. I.D. in inches Set at ft. 19. Perforations: From To 7" 26 6.276 11,341 9,504' to 9,524' MD 18. Tubing Size Weight per foot, Ib. I.D. in inches Set at ft. 2_7/8" 6.5 2.441 9,470 20. Packer set at ft: 21. GOR cf/bbl: 22. API Liquid Hydrocardbons: 23. Specific Gravity Flowing Fluid (G): 9,470 24a. Producing through: 24b. Reservoir Temp: 24c. Reservoir Pressure: 24d. Barometric Pressure (Pa): ^~ Tubing ^ Casing 171 F° 5223 psia @ Datum 9414 TVDSS Asia 25. Length of Flow Channel (L): Vertical Depth (H): Gg: % CO2: % NZ: % HZS: Prover: Meter Run: Taps: 9,504 26. FLOW DATA TUBING DATA CASING DATA N Prover Choke Li if X O pressure Diff. Temp. Pressure Temp. Pressure Temp. Duration of Flow o. ne r ice Psig Hw F° psig F° psig F° Hr. Size (in.) Size (in.) 1 • X 24/64 1150 75 3 2• X 32/64 875 75 2 3. X 40/64 525 75 5 4. X 5. X Basic Coefficient ~ Pressure Flow Temp. F Gravity Factor Super Comp. F t Rate of Flow No. (24-Hour) h Pm actor Fg or ac Q~ Mcfd Fb or Fp Ft Fpv 1. 3750 2. 5200 3. 5250 4. 5. for Separator for Flowing No Pr Temperature Tr z Gas Fluid . T Gg G 1. 2. 3. Critical Pressure 4. Critical Temperature 5. ~~~ ~. ~(~t Form 10-421 Revised 1/2004 CONTINUED ON REVERSE SIDE Submit in Duplicate Pc 4,300 pcz 1 5,223 p~ 27,276,595 No. Pt Pte Pcz-PtZ Pw Pv~ PcZ-PvVz Ps Ps2 Pfz-PsZ DST#1 -Condu 1,150 1,322,500 17,167,500 1,506 2,268,036 25,008,559 2. 875 765,625 17,724,375 1,262 1,592,392 25,684,204 3. 525 275,625 18,214,375 924 853,406 26,423,189 4. 5. 25. AOF (Mcfd) 7,610 Mcf/d Remarks: 1 hereby certitynthat thelforegoing is true and correct to the best of my knowledge. Signed ~~~ ~.J,~,,.-~rn..-i Title ~es~~o~ ~ ~. g,.,e~r n 8.065 Date - 2 -2. ~ -aS` DEFINITIONS OF SYMBOLS AOF Absolute Open Flow Potential. Rate of Flow that would be obtained if the bottom hole pressure opposite the producin face were reduced to zero psia Fb Basic orifice factor Mcfd/ hwPm Fp Basic critical flow prover or positive choke factor Mcfd/psia Fg Specific gravity factor, dimensionless Fpv Super compressibility factor= ~ dimensionless Ft Flowing temperature factor, dimensionless G Specific gravity of flowing fluid (air=1.000), dimensionless Gg Specific gravity of separator gas (air=1.00), dimensionless GOR Gas-oil ratio, cu. ft. of gas (14.65 psia and 60 degrees F) per barrel oil (60 degrees F) hw Meter differential pressure, inches of water H Vertical depth corresponding to L, feet (TVD) L Length of flow channel, feet (MD) n Exponent (slope) of back-pressure equation, dimensionless Pa Field barometric pressure, psia Pc Shut-in wellhead pressure, psia Pf Shut-in pressure at vertical depth H, psia Pm Static pressure at point of gas measurement, psia Pr Reduced pressure, dimensionless Ps Flowing pressure at vertical depth H, psia Pt Flowing wellhead pressure, psia Pw Static column wellhead pressure corresponding to Pt, psia Q Rate of flow, Mcfd (14.65 psia and 60 degrees F) Tr Reduced temperature, dimensionless T Absolute temperature, degrees Rankin Z Compressibility factor, dimensionless Recommended procedures for tests and calculations may be found in the Manual of Back- Pressure Testing of Gas Wells, Interstate Oil Compact Commission, Oklahoma Citv. Oklahoma. Form 10-421 Revised 1/2004 Side 2 • West Foreland #1 - 9400' Sand DST #1 (9,504' - 9,524' MD) (2-21-62) Surface BH Gas BH Flowing BH Shut-in Choke Choke Flowrate Pressure Pressure Size Size Q Ps Pf DD (Pf^2-Ps^2) (1164") (1/64") (Mscf/d) (psia) (psia) (%) (psia^2 x 10e3) 16 16 3,750 3,197.8 5,204 38.6 16,857 24 16 2,250 914.2 5,204 82.4 26,247 32 16 2,750 662.8 5,204 87.3 26,643 24 24 3,750 1,501.1 5,204 71.2 24,829 32 24 5,200 1,260.9 5,204 75.8 25,493 40 24 5,250 926.0 5,204 82.2 26,225 AOF 7,563 0.0 5,204 100.0 27,083 From AOF Plot: y = 8948.1 "x^0.124 (Pf^2-Ps^2) = 8948.1'Q^0.124 (Pf^2) = 8948.1 "AOF^0.124 AOF = [(Pf^2)/8948.1]^(1/0.124) a = 8948.1 b = 0.124 AOF n (Msc/d) 8.065 7,556 8.065 8,470 8.065 6,805 Ave 7,610 From Form 10-421: AOF = O*[Pf^2/(Pf^2-Ps^2)]^n WEST FORELAND #1 - 9400' GAS SAND AOF PLOT (2/21/62) 100,000 M d O K N .N a N fA d N w a 10, 000 ~- 1,000 O Clean-up Flowrates (2/21/62) ---------------------------------- • Multi-Rate Flow Test (2/21/62) ----------------------~---------- Least Squares Best Fit -----------------------~---------- --------- ~ ----------------------------------r-- ,---------,------ ----------------------------•---------------~------------~------+----a---------~------ '---------*-----------------~---- '~---°--------~----T---~---------~------ 1 1 1 i y = 8948.1 xo. i za R2 = 0.7537 ' FBHP = 0.0 psis ' 1 ® Theoretical Absolute ' Open Flow (AOF) ' = 7.6 MMscf/d ' 10,000 • • GAS RATE (Mscf/d) STATE OF ALASKA ' ALAS~OIL AND GAS CONSERVATION COMMI~ON REPORT OF SUNDRY WELL OPERATIONS ~i~r~ ommission deeper Zone 1. Operations Abandon Repair Well Plug Perforations Stimulate Other ~~pr ~ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ 2. Operator Forest Oil Corporation 4. Current Well Class: 5. Permit to Drill Number: Name: Development Q Exploratory^ 61-49 3. Address: 310 K Street, Suite 700 Stratigraphic^ Service^ 6. API Number: Anchorage, Alaska 99501 50-133-10028-00 7. KB Elevation (ft): 9. We-I Name and Number: 90 Feet West Foreland Well # 1 8. Property Designation: 10. Field/Pool(s): Gas Well West Foreland 11. Present Well Condition Summary: Total Depth measured 11,341' feet Plugs (measured) 8551' CIBP true vertical Same feet Junk (measured) Effective Depth measured 9,551' feet true vertical Same feet Casing Length Size MD TVD Burst Collapse Structural Conductor 84' 20" 84' 84' Surface 1,945' 13-3/8" 1,945' 1,945' Intermediate 7,360' 9-5/8" 7,360' 7,360' ~~Wy~,,~~ _ Production 11,341 7" 11,341 11,341 ~~9'61:'D~~~' ~~==.~ ~~ ~ ~~ Liner Squeezed: (7,370-90, 7,440-42, 7,666-88, 8,505-26', ) Perforation depth: Measured depth: Open and Producing: 9,504'-9524' Shot 6 JSPF, 9,336-9352, 6 JSPF open but isolated behind a sliding sleeve. True Vertical depth: Same Tubing: (size, grade, and measured depth) See Schematic Mixed 2-7/8" 6.5# to 9229'. 2-3/8" 4.7# N-80 from 9235' to 9469' Packers and SSSV (type and measured depth) See Schematic 7" Hydro I pkr @ 7094' , 7" Hydro I pkr. @ 9221', 7" Arrowpak Packer @ 9,423'. 12. Stimulation or cement squeeze summary: Intervals treated (measured): None. 6~F~, p~~ ~ ~ ~oOrJ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 2,400 0.12 0 1,700 Subsequent to operation: 0 3,500 0 0 3,025 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory^ Development ^ Service ^ Daily Report of Well Operations Attached 16. Well Status after proposed work: Oil^ Gas ^~ WAG ^ GINJ ^ WINJ ^ WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Printed Name Ted Kramer Title Production Manager ~ Phone 907-868-2137 Date 12!21/2005 Signature ~° ~ Form 10-404 Revised 04/2004 ~ ~' ~ ~ ~ v ~ ~ Submit Original Only l~ • '~ FOREST OIL CORPORATION WEST FORELAND # 1 SINGLE SELECTIVE ELEVATION: 90' KB Date:12/21/05 GL= 78' Modified by Ted Kramer Methanol Injection Mandrel @ 2,939" w/ 114" Control Line 13 318" 54.5# J-55 @ +/-1,945' MD/TVD .M'` **Note: The following are some old test perfs that have been squeezed off: 7370-90, 7440-42, 7666-88, 8505-26, 8918-20 & 9042-62 3% KCL Completion Fluid 9 5/8" 36-40# J-55/N-80 @ +/- 7,360' MDITVD " 6.5# L-80 EUE 8rd Tubing 2 7/8 x 2 7/8" "X" Nipple @ 7,085' ~ 7" 26 # Hydro 1 PKR. @ 7,095' MD ~-7" 26 # Hydro I PKR. @ 9,221' MD s 3" Model XO Sliding Sleeve @ 9,291 ' Upper PERF'S 9336-9352' scP BJ 6 JSPF 2 318" Blast Joints across Perforations (39.75') @, 9,333' E E T bi " TCP on Y Block u ng 4.7# N-80 U 2 3/8 m W 6"Centralizer above Seal Assembly @ 9420' ~- 7" 26# Arrowpak Packer w/Seal Bore @ 9,423' MD Lower Perfs x 2 318" "XN" (1.875") Nipple @ 9,459' 9504-9524' wITCP 6 JSPF TCP /New Bridge Plug @ 9551' MD / Old Test Perfs. Old Test Perfs. 9 521-24,50-70, 9,688-710,10,194-224 r 10,952-76 EZSV @ 10,908' currently set 11,044-56 EZSV @ 11,033' currently set 11,074-82 EZSV @ 11,059' currently set 11,122-34' 7" 29# N-80 BTC at surface, 26# 8~ 23# N-80, 23# S-95 7" 26 # S-95 STC @ 8144-11,341'MD . , ~, Morning Summary wF#1 10-20-05.txt From: WFCM Sent: Thursday, October 20, 2005 4:35 AM To: Sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@foresto~l.com); Roy Smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Steve Godfrey Subject: west Foreland #1 Morning Summary 10-20-05 R/D NABORS 26 RIG AND MOVING RIG COMPONENTS TO WEST FORELAND #l. STRIAGHTEN HERCULITE FOR RIG. SET MAT BOARDS. BACK CARRIER ONTO MATS, STAYING 10' FROM WELL. FILL IN AROUND OUTSIDE OF CELLAR & LEVELED FOR PIPE RACKING BOARDS. SPOTTED MUD PITS. CHARGED PUMP SKID & MUD PUMP. HOOKED UP MUD PITS WHILE SETTING KOOMEY HOUSE, CHOKE HOUSE & JUNK BOX. SET IN GENERATOR SKID & CHANGE HOUSE. HOOKED UP LIGHTS TO PITS & STARTED TAKING ON FLUID TO PITS. CONTINUE HOOKING UP ELECTRIC LINES. SPOT TIGER TANK. START BERMING. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ~~ • Morning Summary wF#1 10-21-OS.txt From: WFCM Sent: Friday, October 21, 2005 4:30 AM To: sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Steve Godfrey Subject: west Foreland #1 Morning Summary 10-21-05 HOOK UP MUD LINES. FILLED MUD PITS W/ FIELD WATER. HOOKED UP ELECTRIC LINES. R/U TO KILL WELL - MIXED 3% KCL. PRESSURE TESTED LINES TO 5000 PSI. PUMPED 37 BBLS OF 3% KCL AT 1 TO 2 BPM. MONITORED WELL. ATTEMPTED TO SET BPV - NO G0. MIXED 15 BBL LCM PILL & PUMPED SAME. MONITORED WELL. HAD 500 PSI. BLED OFF SLOWLY. SET SLICKLINE UNIT & R/U SAME. PRESS. TEST LUBRICATOR TO 2000 PSI. TIH WITH 2.35" GAUGE RING TO 50'. POOH & TIH WITH 2.51" PACK OFF PLUG TO 25' & SET SAME. POOH. PLUG LEAKING. TIH WITH 2.5" SD & PRONG AND RETRIEVE PLUG. R/U & PUMPED 15 BBLS OF 3% KCL AT 14 SPM AT 1850 TO 1900 PSI. MONITORED WELL PRESSURE. PRESSURE DROPPED FROM 1850 PSI TO 1200 PSI IN 5 MIN. BLED OF PRESSURE SLOWLY F/ 1200 PSI TO 0 PSI. SLIGHT VACCUUM ON WELL. PUMPED 1 BBL OF KCL. HAD 500 TO 600 PSI. BLED DOWN SLOWLY. MONITORED WELL. BLEED OFF VALVE PLUGGED. BREAK OFF & BLED WELL DOWN. FILLED MUD PITS. BUILT 100 BBLS OF 3% KCL & 15 BBL LCM PILL (MONITORED WELL WHILE MIXING KCL). SLOWLY BUILDING PRESSURE WHILE WELL SHUT IN, HAD 290 PSI. FROM 02:15 TO 03:15 PRESSURE STAYING AT 290 PSI. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary WF#1 10-22-05.txt From: WFCM sent: Saturday, October 22, 2005 6:57 AM To: Roy smith; Cecil Colwell; Andrea Archer; 'dmhall@forest.com '; Emily Jackson-Reardon; Leonard Gurule; Sheree Becker; Steve Godfrey; Ted Kramer Cc: 'lawerence_larson@yahoo.com' Subject: Morning Report & Summary for west Foreland #1 10-22-05 ATTEMPT TO PUMP - NO G0. PUMPED 7 BBLS AT 2000 PSI. BLED WELL DOWN. SHUT IN AND MONITOR WELL PRESSURE. BUILT UP TO 150 PSI. BLED OFF. PREPARED TO SET PLUG W/ SLICKINE. RUN #1 - COLLAR STOP, RUN #2 PACK-OFF TOOL & RUN #3 - SET TOP SLIP TOOL. R/D SLICKLINE. N/D TREE ABOVE MASTER VALVE. FOUND POLISHED BORE TYPE HGR WITH NO THREADS. N/U TREE. SPOTTED CARRIER OVER WELL. SET BOLSTER IN PLACE. HELP PRE-JOB SAFETY MEETING. RAISED AND SCOPED UP DERRICK. SET CMT ANCHOR BLOCKS IN PLACE & R/U GUIDE WIRES. R/U KOOMEY CONTROL LINE TO REMOTE STATION. HELD PRE-JOB SAFETY MEETING ON PULLING TREE. PREPARED TO P/U TREE FROM HGR. M/U TIW & 10' PUP INTO TOP OF TREE. P/U 30K AND HOLD. SLACKED OFF AND BACKED OUT LOCKDOWNS. P/U 35K, SLACKED DOWN TO 20'. BACKED OUT RAMS 3 TURNS. P/U HGR MOVING AT 42K. CONTINUED TO P/U 18". SET BOWL & SLIPS. P/U WT 51K. SLACKED DOWN - BREAK OUT TREE & UNSCREW. L/D TREE & INSTALL COLLAR ON 2-7/8" TBG. M/U 10' PUP JT & TIW VALVE. P/U AND REMOVED SLIPS & BOWL. LAND TBG IN HGR. BREAK OUT PUP JT AND L/D PUP & TIW VALVE. INSTALLED 7-1/16" X 11" ADAPTER SPOOL. STACKED DBL GATE VALVE AND ANNULAR. N/U & TORQUE BOPS. INSTALLED CHOKE HCR & MANUAL VALVE. INSTALLED MANUAL KILL VALVE. Page 1 • Morning Summary WF#1 10-23-05.txt From: Lawerence Larson [lawerence_larson@yahoo.com] Sent: Sunday, October 23, 2005 6:22 AM To: Roy smith; Emily Jackson-Reardon; Andrea Archer; Sheree Becker; Cecil Colwell; Leonard Gurule; Steve Subject: West Foreland #1 Morning Report & Summary 10-23-05 MONITORING ANNULUS WHILE N/U BOPS. HUNG & PINNED RIG FLOOR TO DERRICK. R/U HAND RAILS & STAIRS. M/U TEST JT AND TEST PUMP. TESTED BOPS TO 250 PSI LOW & 5000 PSI HIGH FOR 5 MIN. EACH. SWAPPED OUT MANUAL CHOKE HCR VALVE AND RE-TESTED. INSTALLED CHECK VALVE GUTS AND TESTED. BLOW DOWN CHOKE & KILL LINE, CHOKE MANIFOLD AND TEST PUMP. CHANGED OUT KOOMEY HOSE ON OPEN SIDE OF ANNULAR. SET CAT WALK IN PLACE. R/U BEAVER SLIDE. HUNG CELLAR & RIG FLOOR WIND WALL TARPS. NOTE: RECEIVED VERBAL APPROVAL FROM THE AOGCC & TIM LAWLOR WITH THE BLM TO TEST BLIND RAMS TO 1500 PSI. We still do not have communications at this point at the rig. I am hoping this can be resolved sometime today. Lawerence Larson Yahoo! FareChase - search multiple travel sites in one click. Page 1 • Morning Summary WF#1 10-24-05.txt From: WFCM Sent: Monday, October 24, 2005 4:27 AM To: Sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily ]ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Steve Godfrey subject: west Foreland #1 Morning Summary 10-24-05 R/U SLICKLINE LUBRICATOR & TEST SAME TO 1500 PSI. RIH WITH PULLING TOOL, COULD NOT LATCH. MADE TWO MORE ATTEMPTS - NO LUCK. PUMPED AND BLED OFF PRESSURE WHILE MODIFYING PULLING TOOL. RIH WITH PULLING TOOL & RETRIEVED SLIP STOP. RIH AGAIN AND RETRIEVED PLUG. RIH AND RETRIEVED COLLAR STOP. WORKED PIPE TO 82K. RIH WITH 2-1/4" GAUGE RING. TOOH F/ 9249' AT TOP OF PKR. R/D SLICKLINE & R/U APRS E-LINE. HELD PRE-JOB SAFETY MEETING. TIH WITH 2-1/4" JET CUTTER TO 9193'. PRESSURED UP ON TBG TO 500 PSI. MADE CUT. PRESSURE DROPPED TO 411 PSI. CHECKED FLOW. PUMPED 6 BBLS OF FLUID. FILLED ANNULUS AFTER PULLING TBG FREE WITH 52K P/U WT, CIRCULATED AT 1-1/4 BPM. AT 1000 STKS WITH BAG CLOSED THROUGH CHOKE. OPENED BAG AND CIRC OUT FLOW LINE AT 108 STKS (2.5 BPM AT 788 PSI. PUMPED 92 BBLS. FLUID CHANGED TO DIRTY FLUID. CLOSED BAG & CONTINUED TO DISPLACE THROUGH CHOKE. SMALL GAS BUBBLES COMING UP. CIRC OUT GAS. MONITOR WELL WHILE LEVELING DERRICK. PUMPED PILL & R/D CIRCULATING LINES. BLEW DOWN CHOKE LINE, KILL LINE & KELLY HOSE. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning summary WF#1 10-25-05.txt From: WFCM sent: Tuesday, October 25, 2005 4:48 AM To: Sheree Becker (sLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily ]ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Greg Kirkland; Steve Godfrey Subject: west Foreland #1 Morning Summary 10-25-05 FINISH BLOWING DOWN CHOKE & KILL LINES. L/D 1 JT 2-7/8" TBG & 3- 2 7/8" PUMP JTS. POOH & STAND 10 STANDS 2-7/8" TBG IN DERRICK. POOH L/D 2-7/8" TBG. STRAPPING SAME. PULLED A TOTAL OF 296 JTS. OF 2 7/8" TBG PLUS 1 CUT PIECE. MONITORED WELL WHILE STRAPPING TBG ON PIPE RACK. PREPARED TONGS TO TIH. P/U WEATHERFORD BRIDGE PLUG ASSY. M/U & TIH TO 616'. SET BRIDGE PLUG. TESTED SAME TO 1000 PSI TO VERIFY PLUG SET. RELEASED FROM BRIDGE PLUG. POOH TO 10 STANDS IN DERRICK. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary wF#1 10-26-05.txt From: WFCM Sent: Wednesday, October 26, 2005 4:30 AM To: Sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Greg Kirkland; Steve Godfrey Subject: west Foreland #1 Morning Report 10-26-05 CONTINUE R/D RIG FLOOR. PREPARE TO N/D BOPS. N/D CHOKE VALVES. R/U & P/U STACK. REMOVED OLD WELLHEAD TBG SPOOL. PREPARE TO INSTALL NEW TBG SPOOL. LUBRICATED RIG CHANGED RAMS TO 3-1/2". CHANGED MANUAL CHOKE VALVE ON BOPS. SET BOPS ON WELLHEAD. R/U RIG FLOOR & EQUIPMENT, PIPE RACK, BEAVER SLIDE & CATWALK. TIH W/ 2-7/8" TBG AND L/D SAME. R/U EQUIPMENT TO P/U 3-1/2" PH-6 WORKSTRING. SERVICED RIG. STRAPPED & P/U 3-1/2" PH-6 WORKSTRING AND STAND BACK IN DERRICK. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary wF#1 10-27-05.txt From: WFCM Sent: Thursday, October 27, 2005 4:33 AM To: sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Greg Kirkland; Steve Godfrey subject: west Foreland #1 Morning Summary 10-27-05 CONTINUE P/U 3-1/2~~ WORKSTRING & STAND BACK. R/D RIG FLOOR N/D BOPS. TORQUE SPACER SPOOL BOLTS. CUT 7~~ CSG F/PACKOFF. TRIED TO INSTALL PACKOFF - NOT FITTING PROPERLY. SEND SAME TO MACHINE SHOP. INSTALLED ROOF ON PITS. INSTALLED VAVLE ON SUCTION LINE OF CENTRIFUGE. LOADED PIPE RACK & STRAPPED PIPE. NOTE: MODIFIED CSG PACKOFF ARRIVED AT APPROX. 18:00 HRS. INSTALLED PACKOFF. SET BOPS DOWN ON SPOOL. M/U SPOOL & TESTED TO 1000 PSI. INSTALLED HCR. LAID OVER RIG FLOOR. FILLED HOLE. TESTED UPPER SEALS TO 1500 PSI. BLEW DOWN LINES. P/U HAND RAILS TO FLOOR AND INSTALLED STAIRS. R/U FLOOR AND WINDWALLS FOR CELLAR AND FLOOR. PULLED WEAR BUSHING. R/U AND TESTING 3-1/2~~ RAMS. Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary wF#1 10-28-05.txt From: WFCM Sent: Friday, October 28, 2005 4:33 AM To: Sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Greg Kirkland; Steve Godfrey Subject: west Foreland #1 Morning Summary 10-28-05 FINISHED TESTING BLIND RAMS TO 250 PSI LOW & 5000 PSI HIGH FOR 10 MIN. EACH. BLEW DOWN TEST PUMP & HOSES. PULLED TEST PLUG. INSTALLED WEAR BUSHING. BROKE OUT TIW VALVE F/TEST JT. HEDL PRE-JOB SAFETY MEETING. M/U RETRIEVING TOOL & RIH W/9 STANDS 3-1/2~~ PH-6 D.P. P/U 2 SINGLES OFF OF PIPE RACK. INSTALLED TIW VALVE. R/U CIRC HOSE. LATCHED ONTO BRIDGE PLUG. PRESSURED DOWN D.P. W/ANNULUS CLOSED W/300 PSI. JAY INTO & RELEASED BRIDGE PLUG. MONITORED WELL, WELL STATIC. R/D & BLEW DOWN CIRC HOSE. POOH SLOWLY W/ BRIDGE PLUG & L/D SAME. P/U & R/U HANDLING TOOLS AND RIG TONGS FOR 4-3/4~~ D.C. P/U & M/U CUT LIP GUIDE, GRAPPLE, BUMPER SUB, OIL JARS, PUMP OUT SUB & 6- 4 3/4~~ D.C.S R/D RIG TONG FOR 4 3/4" HANDLING TOOLS. P/U & R/U POWER TONGS & 3-1/2~~ HANDLING TOOLS. RIH W/25 STANDS OF 3 1/2~~ D.P. OUT OF DERRICK. START P/U 3 1/2~~ PH-6 D.P. FROM PIPE RACK. NOTE: 190 JTS IN HOLE AT 04:00 HRS Lawerence Larson Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ' • Morning summary wF#1 10-29-O~xt From: WFCM Sent: Saturday, October 29, 2005 4:42 AM To: sheree Becker (SLBecker@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Ted Kramer; Andrea Archer; Greg Kirkland; Steve Godfrey subject: Revised west Foreland #1 Morning summary Good Morning A11, CIRC BTMS UP BLOW DOWN LINES CONT TO RIH, STRAP & P/U 3-1/2" D.P., RABBITING OFF RACK. TAG TOP OF FISH @ 9257' SPACE OUT L/D JT# 289 INSTALL TIW, CHANGE ELEVATORS, R/U POWER SWIVEL. BREAK CIRC; ROT FREE 3K, RIH OVER FISH, SLACK OFF 7', SET 20K DOWN, P/U 120K W/ JAR PULL FISH FREE. R/D SWIVEL & TOOLS, P/U TOOLS TO POOH. START POOH, FLUID OUT OF BALANCE, CRIC, MIX & PUMP SLUG POOH W/ FISH SLM Have a Great weekend, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary wF#1 10-30-05.txt From: WFCM Sent: Sunday, October 30, 2005 6:59 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (cNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject,: Morning Summary WF#1 10-30-05 Good Morning All, L/D FISH MAKE UP BHA #2 MILLING ASSEMBLY CLEAR RIG FLOOR & CHANGE OVER POWER TONGS TIH W/ MILLING ASSY, FILL PIPE EVERY 30 STDS. R/U POWER SWIVEL MILL PKR F/ 9273` TO 9275.5` PUMPING SWEEP, PKR RELEASED & MOVED DOWN HOLE, FOLLOW PKR TO 9283'. PUMP SWEEP TO SURFACE NOTE: FALL BACK 1 HOUR DUE TO DAY LIGHT SAVINGS TIME. R/D POWER SWIVEL POOH W/ MILLING ASSEMBLY PRESENT OPERATION: POOH W/ MILLING ASSEMBLY PROPOSED ACTIVITY: CONT POOH, L/D MILL ASSEMBLY, TIH W/ SPEAR. Enjoy your weekend, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary WF#1 Rev 10-31-05.txt From: WFCM Sent: Sunday, October 30, 2005 6:59 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning summary & Report for west Forland#1 Good Morning All, L/D FISH MAKE UP BHA #2 MILLING ASSEMBLY CLEAR RIG FLOOR & CHANGE OVER POWER TONGS TIH W/ MILLING ASSY, FILL PIPE EVERY 30 STDS. R/U POWER SWIVEL MILL PKR F/ 9273' TO 9275.5' PUMPING SWEEP, PKR RELEASED & MOVED DOWN HOLE, FOLLOW PKR TO 9283'. PUMP SWEEP TO SURFACE NOTE: FALL BACK 1 HOUR DUE TO DAY LIGHT SAVINGS TIME. R/D POWER SWIVEL POOH W/ MILLING ASSEMBLY PRESENT OPERATION: POOH W/ MILLING ASSEMBLY PROPOSED ACTIVITY: CONT POOH, L/D MILL ASSEMBLY, TIH W/ SPEAR. Enjoy your Weekend, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • • Morning summary wF#1 11-O1-05.txt From: WFCM Sent: Tuesday, November Ol, 2005 4:24 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary for west Foreland #1 Good Morning All, CUT & SLIP 159" DRILL LINE & ADJUST BRAKES. TIH W/ SPEAR, BREAK CIRC EVERY 30 STDS, TAG PKR @ 9343', PUSH DOWN TO 9473'. CIRC BTMS UP, SOME GAS BACK, AIR IN MUD. POOH W/ FISH TO DC'S CHANGE HANDLING EQUIP FOR DC'S & RACK BACK SAME IN DERRICK. Have a Nice Day, Brent ~. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ~~ • • Morning Summary WF#1 11-02-05.txt From: WFCM sent: Wednesday, November 02, 2005 4:33 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (cNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary west Foreland #1 Good Morning All, R/U SLB W/L TO RUN GR/CCL RIH W/ SLB S/L GR/CCL & POOH R/D SLB W/L CLEAR RIG FLOOR WHILE READING LOGS M/U & P/U BHA #4 RUN D/C & R/D ROTARY TOOLS TIH W/ BHA #4, FILL PIPE EVERY 30 STDS. CIRC & WEIGHT UP FLUID F/ 7 PPG TO 8.8 PPG, MIX 70 BBLS IN ACTIVE PUMP DOWN TBG BACK THROUGH CHOKE MANIFOLD TO FRAC TANK. BLOW DOWN CHOKE MANIFOLD & KELLY HOSE, PUMP 70 BBLS OF WATER FROM FRAC TANK TO ACTIVE PIT, WEIGHT UP & START CYCLE AGAIN 8.8 PPG FLUID TO SURFACE @ 04:30 Present operation: Circulating Have a Nice Day, Brent ~. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • • Morning Summary wF#1 11-03-05.txt From: WFCM sent: Thursday, November 03, 2005 4:43 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning summary for west Foreland #1 Good Morning All, P/U, R/U, POWER SWIVEL, SECURE SANDLINE FOR SWIVEL TORQUE CONTROL, TAG @ 9470'. MILL RETAINER FROM 9470' - 9472' MUD PUMP OILER FAILED. REMOVE FAILED PUMP, R/U AIR DIAPHRAGM PUMP. MILL RETAINER F/ 9472' TO 9474' ATTEMPT TO CHANGE TO SHORT STIFF ARM ON POWER SWIVEL, ID TO SMALL .REINSTALL LONG ARM. MILL THROUGH RETAINER @ 9475' & MILL CEMENT F/ 9475' - 9482' DRESSED SHORT STIFF ARM ON SWIVEL, ATTEMPT TO INSTALL, STILL TO TIGHT. MILL CEMENT F/ 9482' TO 9497' WORK PIPE WHILE RT & RECIPROCATING. MAKE CONNECTION & REPLACE STIFF ARM. MILL CEMENT F/ 9497' TO 9513'@ 04:30 Have a Great Day, Brent ~. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary WF#1 11-04-05.txt From: WFCM Sent: Friday, November 04, 2005 4:13 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHWilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EE~ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland subject: Morning Summary WF#1 11-4-05 Good Morning All, FINISH MILLING OUT CMT F/ 9525' TO 9545' CIRC HI-VIS SWEEP AROUND L/D POWER SWIVEL & BLOW DOWN LINES PULL ONE STD & P/U & BREAK DOWN POWER SWIVEL & SECURE ON SKID. CLEAR RIG FLOOR OF TOOLS & R/U POWER TONGS GENERATOR WENT DOWN, TROUBLE SHOOT & REPAIR SAME BUILD KCL VOLUME IN PITS & MONITOR WELL SLUG PIPE & POOH W/ MILL ASSEMBLY CHANGE HANDLING EQUIP & STD BACK D.C. & L/D MILL ASSEMBLY M/U BOOT BASKET, 6" BIT & 7" CSG SCRAPER, TIH W/ D.C.'S CLEAR RIG FLOOR OF D.C. HANDLING TOOLS TIH W/ 7~~ CSG SCRAPERS Have a Nice Day, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ~~ • C~ Morning Summary wF#1 11-05-05.txt From: WFCM Sent: Saturday, November 05, 2005 4:31 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHWilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-05-05 Good Morning All, TIH W/ 6~~ BIT, 7~~ SCRAPER & BOOT BASKET PULL SINGLE STD, R/U CIRC HEAD & WASH TO 9545'. CIRC SWEEP BTMS UP TROUBLE SHOOT DRAW WORKS CLUTCH NO AIR, PUT HEAT ON CONTROLS BLOW DOWN LINES & CLEAN PITS MIX 3% KCL FLUID Have a Nice weekend, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning summary wF#1 11-06-05.txt From: WFCM Sent: Sunday, November 06, 2005 5:23 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHWilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary for wF#1 11-6-05 Good Morning All, FINISH MIXING 390 BBL 8.8 PPG KCL WATER IN FRAC TANK & BUILD 25 BBL HI VIS SPACER SWEEP PUMP 25 BBL HI-VIS SPACER & DISPLACE HOLE W/ CLEAN 8.8 KCL WATER BLOW DOWN CHOKE & KILL LINES PUMP SLUG & BLOW DOWN LINES POOH & L/D 3.50 WORK STRING Thanks, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary WF#1 11-07-05.txt From: WFCM sent: Monday, November 07, 2005 4:38 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-7-05 Good Morning All, FINISH POOH, L/D 3.50~~ WORK STRING & BHA PULL WEAR BUSHING R/U SLB E/L & RUN 6~~ RING GAUGE & JUNK BASKET, TAG @ IRON BRIDGE & TIH, SET @ 9539 POOH & R/D SLB E/L P/U 7~~ RETRIEVABLE BRIDGE PLUG & TIH, SET SAME @ 620 POOH L/D 3.50~~ WORK STRING BLOW DOWN LINER & CHANGE RAMS TO 2-7/8~~ R/U & TEST 2-7/8~~ RAMS, 250 PSI - 5000 PSI = OK R/D TEST JT & BLOW DOWN LINES M/U BRIDGE PLUG RETRIEVING TOOL & TIH, P/U 2-7/8 TBG POOH W/ RETRIEVABLE BRIDGE PLUG Happy Monday, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 9545' ELM, POOH M/U 7~~ CAST & RETRIEVE PLUG. Page 1 • n LI Morning summary wF#1 11-08-05.txt From: WFCM Sent: Tuesday, November 08, 2005 4:45 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF#1 11-08-05 Good Morning A11, R/U & P/U COMPLETION HOLD PJSM, P/U GUNS, NIPPLES, PUPS & SPACE OUT JT, P/U PACKER, & TIH ON E/L, TIE IN WITH LOG & SET PKR @ 9418.6', GUNS @ 9504' - 9524', POOH R/D SLB E-L P/U SEAL ASSEMBLY, SPACE OUT JNTS & GUNS P/U 2-7/8" COMPLETIONS STRING, CURRENT DEPTH 5100', CURRENT TEMP 8 DEGREES F Have a Great Day Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • • Morning Summary wF#1 11-09-05.txt From: WFCM sent: Wednesday, November 09, 2005 4:27 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EE]ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-09-05 Good Morning A11, FINISH P/U 2-7/8~~ COMPLETION TO JNT# 201 P/U CHEM.. INJECTION MANDREL, & R/U SHEAVE & CONTROL LINE & TEST LINE T/ 6600 PSI FOR 15 MIN FINISH P/U 2-7/8'~ COMPLETION & RUNNING INJECTION LINE & BANDING ON EVERY JT. TAG SEALS IN PACKER @ 9418', SPACE OUT & MADE UP TBG HANGER & INJECTION SHEAVE PRESSURED UP TO 200 PSI ON BACK SIDE W/ TBG OPEN = OK R/U SLICK LINE TO SET PLUG Have a Nice Day, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary WF#1 11-10-05.txt From: WFCM Sent: Thursday, November 10, 2005 4:31 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNCOlwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-10-05 Good Morning All, RIH & SET PLUG IN X-NIPPLE @ 9170' ABOVE TOP PACKER, RIH & SET PRONG, POOH. R/U LINES, TEST 3000 PSI, HAD LEAK ON PUP COLLAR, CHANGE OUT PUP & RETESTED = OK, PRESSURED UP ON TBG TO 500 PSI FOR 5 MINS W/ ANNULAR OPEN = OK. PRESSURE UP TO 3500 PSI FOR 30 MIN ON CHART = OK. RIH W/ S/L & PULL PRONG & RIH TO PULL PLUG HAD TO MAKE 2 RUNS TO PULL PLUG. DISPLACE TBG W/ 54 BBL OF DIESEL & PUMP 3 BBLS ON BACK SIDE, SLACK SEALS OFF IN LOWER PACKER & 9418'. R/U 5/L, RIH & ATTEMPT TO SET PLUG IN X-PROFILE IN SLIDING SLEEVE @ 9286', COULD NOT SET POOH, CHANGE OUT PLUG & RUN BACK IN HOLE, SET PLUG & RIH SET PRONG R/U LINES & PRESSURE UP ON TBG TO 2150 PSI & SET HYDRO PACKER @ 9211' S/0 WT 42K P/U WT 47K. RAN HOLD DOWN PING IN ON HANGER RIH W/ S/L RETRIEVE PRONG, MADE TRIP, PULL PLUG, MADE & OPEN SLIDING SLEEVE, POOH, R/D S/L Have a Great Day, Brent ~. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary wF#1 11-11-05.txt From: WFCM Sent: Friday, November 11, 2005 5:02 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF#1 11-11-05 Good Morning All, CONT. TO ATTEMPT TO TEST CSG. TO 2000 PSI, PSI BLEEDING OFF, LOOK FOR SURFACE LEAKS, FOUND NO SURFACE LEAKS PRESSURE UP TO 1000 PSI, 15 MIN PSI DROP 300 PSI EACH TIME WE PRESSURED UP TO 1000 PSI, SET BPV. CLEAR RIG FLOOR OF TOOLS, R/D WIND WALLS & L/D RIG FLOOR N/D BOPE N/U TREE & INSTALL 2 -WAY CHECK R/U LINES TO PUMP DOWN ANNULS PRESSURE UP ON CSG TO 1000 PSI W/ TREE OPEN BLEEDING DOWN 350 PSI IN 15 MIN EACH TIME WE PRESSURED UP TO 1000 PSI INSTALL BPV, & N/D TREE & N/U BOP'S. PULL BPV & INSTALL 2-WAY CHECK R/U & TESTING BOPE 250 PSI - 5000 PSI. Have a Nice weekend, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 Morning Summary wF#1 11-12-05.txt From: WFCM Sent: Saturday, November 12, 2005 5:05 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF#1 11-12-05 Good Morning All, FINISH TESTING BOP'S PIPE RAMS, 250 - 5000 PSI, HYDRILL 250-3500 PSI, CHOKE & KILL LINE VALVES 250 - 5000 PSI, TEST 11 VALVES IN CHOKE HOUSE 250 - 5000 PSI, BLIND RAM 250 - 5000 P52 TIW VALVE & IBOP 250 - 5000 PSI. M/U LANDING JNT & BLOW DOWN CHOKE & KILL LINES PULL 2-WAY CHECK & M/U LANDING JNT & R/U 5/L UNIT RIH W/ S/L & CLOSE SLIDING SLEEVE @ 9286' POOH R/D 5/L BACKED OUT HOLD DOWN BOLTS UNSEAT HANGER & PULL PKR LOOSE WT 82K, PULL HANGER TO RIG FLOOR & REVERSED OUT DIESEL BUILT SLUG, PUMP SAME, R/U NOVA, R/D LINES, L/D LANDING JNT, & L/D HANGER POOH W/ 2-7/8" TBG ROOTING NOVA INJECTION LINES ON REEL Have a Nice weekend, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • • Morning Summary wF#1 11-13-05.txt From: WFCM Sent: Sunday, November 13, 2005 4:56 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (cNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-13-05 Good Morning All, POOH W/ 2-7/8~~ TBG, L/D INJECTION MANDREL & R/D CONTROL LINE SHEAVE. SERVICE RIG FINISH POOH TO 7~~ PACKER L/D COMPLETION BELOW PACKER P/U PACKER PLUG & TIH Enjoy your Weekend, Brent 7. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • • Morning Summary WF #1 11-14-05.txt From: WFCM sent: Monday, November 14, 2005 4:17 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE7ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Sheree Becker (sLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF #1 11-14-05 Good Morning All, FINISH TIH & SET PACKER PLUG IN LOWER PACKER @ 9418' POOH SERVICE RIG & CREW CHANGE FINISH POOH BLOW DOWN FILL LINES M/U TEST TOOL & TIH TO 7200' SET TEST TOOL @ 7200', R/U & TEST CSG TO DOWN TEST LINES, & RELEASE TEST TOOL. POOH W/ TEST PACKER Have a Nice Day, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 1000 PSI FOR 30 MIN ON CHART= OK, R/D, BLOW Page 1 ~ ~ Morning Summary WF#1 11-15-05.txt From: WFCM Sent: Tuesday, November 15, 2005 4:12 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHWilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EE~ackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF#1 11-15-05 Good Morning All, POOH W/ BRIDGE PLUG SERVICE RIG, BLOW DOWN MUD LINES, SWAP OVER TONGS M/U & RIH W/ PACKER PLUG RETRIEVING TOOL LATCH ONTO PACKER PLUG POOH W/ PACKER PLUG Have a Nice Day, Brent ~. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 • Morning Summary wF#1 11-16-05.txt From: wFCM sent: Wednesday, November 16, 2005 4:21 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (cNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary wF#1 11-16-05 Good Morning A11, FINISH POOH W/ PACKER PLUG P/U SEALS & COMPLETION BHA & TIH SERVICE RIG TIH W/ COMPLETION, P/U NOVA INJECTION MANDREL @ 3000 TESTED 6500 PSI FOR 15 MIN = OK, CONT TO TIH RUNNING 1/4~~ LINE BANDING TO EVERY JNT. Have a Great Day, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ~' ~ • Morning summary WF#1 11-17-05.txt From: WFCM sent: Thursday, November 17, 2005 4:38 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily 7ackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary WF#1 11-17-05 Good Morning All, SPACED OUT & LANDED SEALS, TESTED 200 PSI ON BACK SIDE W/ TBG OPEN = OK R/U 5/L, RIH TO SET PLUG IN X NIPPLE @ 7084'. NOTE: HAD TO MAKE 2 RUNS TO SET PLUG & 2 RUNS TO SET & PULL PRONG. R/U PUMP LINES & PULL SEALS OUT OF PACKER W/ 48K TEST TBG 500 PSI FOR 5 MINS & PRESSURE UP TO 3500 PSI FOR 30 MIN ON CHART = OK R/U 5/L, RIH, PULL PRONG & PULL PLUG R/U LINES & DISPLACE TBG W/ 50 BBLS DIESEL & 3 BBLS OF DIESEL ON THE BACK SIDE. R/U S/L & SET PLUG IN SLIDING SLEEVE @ 9290'. NOTE: HAD TO MAKE 2 RUNS TO SET PRONG. R/U LINES & SET PACKERS W/ 2000 PSI, TOP. HYDRO PACKER @ 7080' & 2ND @ 9220' RAN HOLD DOWN PINS IN ON HANGER TESTED CSG TO 500 PSI FOR 5 MIN & 1100 PSI FOR 30 MIN, ON CHART Have a Nice Day, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ~J Morning Summary wF#1 11-18-05 WMRU #4-D.txt From: WFCM sent: Friday, November 18, 2005 4:26 AM To: Ted Kramer (TEKramer@forestoil.com); Cecil Colwell (CNColwell@forestoil.com); Chuck Wilson (CHwilson@forestoil.com); David Hall (DMHaII@forestoil.com); Emily Jackson-Reardon (EEJackson@forestoil.com); Leonard Gurule (LCGurule@forestoil.com); Roy Smith (RLSmith@forestoil.com); Sheree Becker (SLBecker@forestoil.com); Steve Godfrey; Andrea Archer; Greg Kirkland Subject: Morning Summary for W.F.#1 & WMRU #4-D Good Morning All, For west Foreland #1 RIH TO RETRIEVE PLUG, UNABLE TO GET PLUG, MADE 2ND RUN & RETRIEVE PLUG, R/D S/L BACK OUT LANDING JNT & INSTALL BPV N/D BOPE N/U TREE, TESTED VOID 500 PSI, PULL BPV, INSTALL 2 WAY CHECK, TESTED TREE 250 - 5000 PSI, PULL 2-WAY CHECK, INSTALL BPV, RELEASE RIG @ 1600 HRS 11-19-05 For West Macarthur #4D 1600 - 0600 r/d rig & start moving to WMRU #4-D Have a Great Day, Brent J. Terrebonne Rig Clerk/Dispatcher west Foreland #1 Phone: 907-776-7186 Fax: 907-776-7187 Page 1 ,~ Subject; R:;: BOPS Test Report - ?~ahors ?f; BOP Test 10-? ~-0~ ,~~ " ~ ~ i' mod. ,, Fr®rn: James Kegg <~in1_~e~~~~L'admin.state.ak.us~ ~ ~ ~ ' Date: Ion, ?~ Oct 2(.~0~ 1 ~:0~: ~ % -0800 ' ~ ~-=1 ~'€~: tiVFCVI <~t"FC`t-l. c~ForestOiLcom> Thanks, Lawerence. I just spoke with Lou Grimaldi and he provided an explanation of the approval. In the future, it would be helpful to include a brief note in the Remarks section describing a variance and who granted it. Jim Regg `~'FCM wrote: The company man is sleeping right now as he was up all night. I do know that he spoke with both agencies, AOGCC ands the BLM and received the approval to do this. Lawerence -----Original Message----- From: James Regg [maiito:iim regq a~adminstate.ak.us] Sent: Monday, October 24, 2005 11:14 AM To: WFCM Cc: 'aogcc_ Prudhoe bay:~admin.state.ak.us'; 'bob r'Ieckenstein~~wad~;-~in.state.ak.us'; Tom Maunder Subject: Re: ROPE Test Report -Nabors 26 BOP Test 10-23-05 Please provide an explanation for why the blind rams were tested to 1 X00 psi instead of the required 3~.40'psi. I am unaware of any variance approved by the Commission. Jim Regg _..~~-~~ ~~~~n:~~,4 AOGCC V4'FCM wrote: Jim, There was a particular way they wanted these a-mails named and I do not remember how that was. Is there a particular way you would like this handled? Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 of 10/24/200 1:09 PM Re: BOPE Test Report -Nabors 26 BOP Test 10-23-OS ,. - ~ • Subject: Re: BOPF; -hest Report - Nabors2f~'BOP Test 10-23-OS From: Lou Grimaldi...<lou_gritnaldi cr admin.state.ak.us> Datc: Vlon, 24 Oct 2005 13:02:49 -0800 . . To: Jamcs Rc~;~ ~ -1tm_re~g!~r;adm~n.~tatc.ak.u5 Jim, My doing. I talked to Charlie Gray and he explained they did not have a profile in the well for a back pressure valve. As I understood Charlie Gray, the tree was screwed directly to the tubing. A wireline set, tubing stop plug had been set downhole before the rig got there. In my experience these type plugs have a pressure range of 1500-3500 psi depending on the type plug. Charlie Gray had a concern about overpressuring the plug and deforming the tubing making it difficult or impossible to remove. I allowed for him to test the Blinds to 1500 psi, remove the tubing then set a storm packer. This would allow him to set a tubing head adapter and then test the Blinds to the required test pressure. I did require that he have the storm packer on location before he pulled the tubing. I told him if this was not possible to call me before he proceeded, I have not heard back from him. If you need furthur info please let me know. Lou James Regg wrote: Please provide an explanation for why the blind rams were tested to 1500 psi instead of the required 3500 psi. I am unaware of any variance approved by the Commission. Jim Regg ', AOGCC WFCM wrote: Jim, There was a particular way they wanted these e-mails named and I do not remember how that was. Is there a particular way you would like this handled? Lawerence Larson Rig Clerk/Dispatcher Kustatan #1 Phone: 907-776-7186 Fax: 907-776-7187 1 of 1 10/24/2005 1:09 PM STATE OF ALASKA 11/09/04 OIL. AND GAS CONSERVATION COMMISSION Submit toOPE~T~~ ~~ p~Irt,O.s~~#~,~~,~~~ ~~61 I~1~~~6 aE~q~r:..t?r_~~E~~~...k?~~~ ~c~r~3ir ~~~ _~f~_us bob fleckeE:stwi;3~~`~~~r:~ir:.state.alC.f::~ Contractor: Nabors Rig No.: 26 DATE: 10/23/2005 Rig Rep.: Brumley/Fritts Rig Phone: 232-5709 Rig Fax: 776-7189 Operator: Forest Oil Corp Op. Phone: 776-7185 Op. Fax: 776-7189 Rep.: Charlie Gray Field/Unit & Well No.: West Foreland #1 PTD # 161-049 Operation: Drlg: Test: Initial: X Test Pressure: Rams: 250/5000 MISC. INSPECTIONS: Test Result Location Gen.: P Well Sign Housekeeping: P Drl. Rig PTD On Location P Hazard Sec Standing Order Posted P BOP STACK: Quantity Size Workover: X Explor.: Weekly: Bi-Weekly Annular: 250/3500 Valves: 250/5000 TEST DATA FLOOR SAFETY VALVES: Test Result Quantity Test Re P Upper Kelly NA P Lower Kelly NA P Ball Type 2 P Inside BOP 1 P Test Result Annular Preventer 1 11" P Pipe Rams 1 2-7/8" P Lower Pipe Rams 1 N/A NA Blind Rams 1 11" P Choke Ln. Valves 1 3-1/8" FP HCR Valves 1 3-1/8" P Kill Line Valves 2 2-1/16" P Check Valve 1 2-1/16" P MUD SYSTEM: Visual Test Alarm Test Trip Tank NA NA Pit Level Indicators P P Flow Indicator NA NA Meth Gas Detector P P H2S Gas Detector P P Test Results CHOKE MANIFOLD: Quantity Test R~ No. Valves 13 FP Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test R System Pressure 3050 psi P Pressure After Closure 1700 psi P 200 psi Attained 17 sec P Full Pressure Attained 1 min.18 sec. P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 2250 psi avg. Number of Failures: 2 Test Time: 11 Hours Components tested 22 Repair or replacement of equipment will be made within days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: jinn r{~a:g.;~~t:;a3~n:nsta#E'.~~k.us Remarks: Greased and retested #2 choke manifold valve & 3-1/8" manual choke valve. Tested blinds at 250 psi low and 1500 psi high. 24 HOUR NOTICE GIVEN YES X NO Date 10/21/05 Time Test start 1430 hrs Finish 1200 hrs Waived By JIM REGG Brumlev/Fritts Witness BOP Test (for rigs) BFL 11/09/04 2005-1023 BOP Nabors26 WF#1.xls • L\ I j ']~' i i I i ~ I , I ~ ~LASSA OIL ~D Grp COI~TSERQATIOIQ CO1~Il~IISSIOIQ Paula Inman Alaska Production Engineer Forest Oil Corporation 310 K Street, Suite 700 Anchorage, Alaska 99501 Re: West Foreland # 1 Sundry Number: 30~-146 Dear Ms. Inman: FRANK H. MURKOWSKI, .GOVERNOR 333 W. 7"' AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 b~9 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior/~~}t unless rehearing has been requested. DATED this /S day of June, 2005 Encl. • F O R E S T O i L C O R P O R A T I O N • ~~0 ~~C-~ta~~ • C~~u,~fie X00 Y ~~,~/~ ~i~,rsu~~e, C~cr~~,a; 9950 • ~90~~ ~.~8-8600 • ~907~ z58-8so~ ~~~~ June 8, 2005 Mr. John Norman, Chair ;, ~ h~ Alaska Oil and Gas Conservation Commission 333 W. 7~' Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: WF #1 Re-completion Dear Mr. Norman, Forest Oil proposes to work over Well WF #1 in the West Forelands Field of Cook Inlet to convert it from a single completion gas producer to a single selective completion to allow the separate or simultaneous production of the currently produced interval and a new deeper one. The work to be performed is outlined in the attached summary procedure. The estimated date for commencement of this work is July 11, 2005. Attached please find a completed Form 10-403 for the work, an outline procedure, a current wellbore schematic, a proposed wellbore schematic and a BOP configuration diagram for the workover unit to be used. If you have any questions, please contact me at 868-2135. Sincerely, r Paula Inman Alaska Production Engineer Forest Oil Corporation Attachments: 10-403 Application for Sundry Approvals Outline Procedure Current Wellbore Schematic Proposed Wellbore Schematic 11" SM BOP Schematic ORIGINAL 1. Type of Request: Abandon Suspend Operatwnal shutdown Perforate ~ Waiver ether Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension ^ Change approved program ^ Pull Tubing ^~ Perforate New Pool ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Forest Oil Corporation Development Q Exploratory ^ ~'~`` 3. Address: Stratigraphic ^ Service ^ 6. API Number: 310 K Street, Suite 700, Anchorage, AK 99501 50-133-10028-00 7. KB Elevation (ft): 9. Well Name and Number: 90' West Foreland #1 8. Property Designation: 10. Field/Pools(s): A 035017 West Foreland 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13,500 13,500 9,475 9,475 9,475 None Casing Length Size MD TVD Burst Collapse Structural Conductor 84' 20" 84' 84' N/A NIA Surface 1,945' 13 3/8" 1,945' 1,945' 2,730 psi 1,130 psi Intermediate 7,360' 9 5l8" 7,360' 7,360' 3,520 psi 2,020 psi Production 11,341' 7" 11,341' 11,341' 6,340 psi 3,830 psi Liner Perforation Depth MD (ft): Pertoration Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9,336-9,352' 9,336-9,352' 2 7/8" 6.5# N-80/J-55 9,276' Packers and SSSV Type: Baker Model D / No SSSV Packers and SSSV MD (ft): Packer at 9,272' 12. Attachments: Description Summary of Proposal ~ 13. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^~ Exploratory ^ Development ^~ Service ^ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 7/11/2005 Oil ^ Gas ^~ Plugged ^ Abandoned ^ 16. Verbal Approval: Date: WAG ^ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Paul nman Title Alaska Production Engineer Signature ~e (907) 868-2135 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: „30S - ~ ,~ Plug Integrity ^ BOP Test Mechanical Integrity Test ^ Location Clearance ^ Q ~fC.C1`>tt' COiO~ S~ ~'nS~l~~ CQ^ Other:.5,~©®Q s~ ~~ }~S"Y b S `4'nhC~ , ~ -~~ ; \` Subsequent Form ' ed: ~ ~ ~~~` v~\~S~ ~ ~~~.~~~~"iEj`~ ~M O~S ~~ ~~~ C ~ APPROVED BY ~ /~ Approved COMMISSIONER THE COMMISSION Date: v U ~„15,pS ~. ~. < <' ~ ~-,~ STATE OF ALASKA ` AL~ OIL AND GAS CONSERVATION COM ~~SIO ~!' ~s~~ 1 '~'' 5 ~ ~~-, APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 ~ .:.. ~~,. >x~glQ )~~ ^'t Form 10-403 Revised 11/2004 Submit in Duplicate West Foreland #1 r ~ SubjeC"c: West Foreland #1 From: Thomas Maunder <tom maunder@admin.state.ak.us> Date: Mon, 13 Jun 2005 15:37:49 -0800 To: Paula Inman <prinman@forestoil.com> CC: Ted Kramer <tekramer@forestoil.com> Pau]Q and Ted, I am looking at the proposed workover procedure on this well. A couple of questions. 1. For ram changes, you propose to "set a shallow bridge plug". I presume this would be a Halliburton Storm Packer or equivalent. Is this correct?? 2. Will a test plug be employed for BOP testing?? 3. It is stated on page 1 of the procedure that the original DST results can be used for the 9400' sand. I have looked into our file and I don't find a report for the 9400' interval. There are is a 4 point DST report in the file, but it appears to be for the 9200' sand. If you have information on the 9400' sand, I would appreciate if you would provide it to the Commission. Thanks in advance for your reply, Tom Maunder, PE AOGCC 1 of 1 6/13/2005 3:38 PM ~~« ~~~ ~~~ t ~ ~v ~ s * ~ ~~` ~ ~ ~~~ M ~ ., ~ CAt'~"t' ~C~G: .~~~~~ ~ '~~ ` ~ ~! ,~ ~ ~ ~~ ~i~YC~'L^.' ~~ ~~ ~, ~ ` ~ ~ ~, ~~ ~~ C~~ ~'w..' ~ ~~ r ~ y~ ~ ~r ~ , • ii ii KK ,gyp ^^~~"" ~ ~ ~t . i7$ i+r +~f i. ' ~t~~ ~~ ~ ;~ 9~~~-95 r a .~ .. ~. ~'~.: ~ .: t~~~ ' '. ~"...c.i ~-~3f3~X~ r.. 'Y ar ~ ~/~ i ~~~ ~ ~ F ~ iY.f ~.'~ ai i1:• a 1 x +~. • TCP FOREST OIL CORPORATION WEST FORELAND # 1 PROPOSED SINGLE SELECTIVE WORKOVER ELEVATION: 90' KB Date: 5/27/05 Prepared: Eric Skaalure Methanol Injection Mandrel @ 3,000' w/ 1/4" Control Line 13 318" 54.5# J-55 @ +/- 1,945' MD/TVD M **Note: The following are some old test perfs that have been squeezed off: 7370-9G, 7440-42, 7666-88, 8505-26, 8918-20 & 9042-62 3% KCL Completion Fluid 9 5/8" 36-40# J-55/N-80 @ +/- 7,360' MD/TVD " 6.5# L-80 EUE 8rd Tubing 2 7/8 2 7/8" "X" Nipple 1 Joint Above Packer x ~ 7" 26 # Hydraulic Retrievable Packer @+/-9220' MD ss 2 3/8" Sliding Sleeve w/X profile 1 Jt Below Packer TCP BJ 2 3/8" Blast Joints across Perforations +/- 40' " TCP on Y Block 4.7# N-80 EUE Tubing 2 3/8 m m 5.5" Centralizer above Seal Assembly ~ 7" 26# Packer w/Seal Bore @ +/- 9,450' MD x 2 3/8" "XN" Nipple 1 Joint Below Packer in LS PROPOSED PERF'S 9504-9524' wITCP TcP ~ New Bridge Plug @ 9540' MD Old Test Perfs. Old Test Perfs. 9 521-24,50-70, 9,688-710,10,194-224 10,952-76 EZSV @ 10,908' currently set 11,044-56 = EZSV @ 11,033' currently set 11,074-82 ___; EZSV @ 11,059' currently set 11,122-34' ~_ 7" 29# N-80 BTC at surface, 26# 8~ 23# N-80, 23# S-95 7" 26 # S-95 STC @ 8144-11,341'MD • FOREST OIL CORPORATION W. Foreland #1 Single Selective Completion Workover Summary- 6/7/05 Current Status: Single zone gas completion in 9200' GO sand producing 2-3.5 MMSCFD at 80 deg F and 2250 psi FWHP. No known mechanical problems. Straight hole. The well has a 3/8" methanol injection line run inside the tubing string from the swab cap to +/- 3000'. Current reservoir pressure of 9200' sand estimated at 3054 psi (12/13/04 BHP test, 9200'), 175 deg F. Shut-In surface pressure = 2500 psi. No known equipment currently installed in tubing string. Annulus Fluid: Drilling Summary shows displaced with water and 1 bbl diesel freeze protect, but could be 9.7 ppg CaC12. ---~ G,.3 ~ hW ~~~ ~ ~~3 Objective: Pull existing 2 7/8" single completion; mill out packer; clean out wellbore to access 9400' sand; run new 2 7/8" single selective tubing completion to produce 9200' and 9400' sands individually; reperforate 9200' sand and perforate 9400' sand. No need to flow test 9400' sand for AOGCC, can use original DST results. Current reservoir pressure of 9400' sand is unknown; original pressure was 4315 psi. _ NOTE: There are five different grades of 7" Casing in this well: Surf.-1476' MD-29# N-80 1476-3276' MD-26# N-80 3276-6018' MD23# N-80 6018-8144' MD-23# 5-95 8144-11341' MD--26# 5-95 The Top 1460' MD of existing 2 7/8" Tubing is N-80 EUE 8rd; remainder is J-55 grade Retrieve 3/8" Methanol Injection line from inside tubing. (This has been completed) 2. Pump 3%KCL down tubing to load well 3. RU Slickline unit 4. Make 2" gage ring run below 2.25" ID Camco D Nipple at 9241' MD. 5. RU Wireline; RIH with Chemical Cutter to cut tubing at 9257' MD 6. Circulate completion fluid out of annulus with 3%KCL. Note: Monitor well. May need to kill open perfs with KCL sized salt pill. 7. Set Type H BPV in Cameron LDO Tubing Hanger 8. MIRU Nabors Pulling Unit 9. Nipple up SM BOP's with 2 7/8" BOP Rams on 6" SM Tubing Head and conduct BOPE Test to 5000 psi; test downstream piping to 250 psi. 10. Make up 2 7/8" EUE tubing joint on LDO Tubing Hanger 11. Install lubricator and remove BPV 12. RD lubricator. 13. Backout rams on Tubing Spool to release Tubing Hanger. Pu112 7/8" tubing hanger and tubing and lay down tubing. Cameron to inspect/service wellhead valves. Created by Eric Skaalure Page 1 of 3 C:\Documents and Settings\bill\Desktop\WF#1SSWOsum0607.doc • FOREST OIL CORPORATION W. Foreland #1 Single Selective Completion Workover Summary- 6/7/05 14. Set shallow 7" Bridge Plug, replace existing ram-type Tubing Head Spool with new Tubing Head Spool and pressure test to 5000 psi. 15. Change over to 3 %2" BOP Rams and test to 5000 psi. 16. Pull shallow Bridge Plug. 17. RIH with overshot and latch onto cut tubing at 9257' MD. Jar Seals out of Packer. Note: Circulate and monitor well. May need to kill open perfs with KCL sized salt pill. 18. P/U Packer Milling Tool on 3 %2" work string to mill out Baker Model D Packer at 9273' MD. Pump hi vis sweeps to clean out mill cuttings. 19. Spear and retrieve Packer 20. RU wireline and run GR/CCL for correlation of depths from top of Bridge Plug at 9475' MD to cleanout target depth of 9545' MD. 21. RIH with 6" Junk Mill to drill out Retainer at 9475'MD and clean out cement to 9545' MD, just above squeezed perfs at 9550' MD. 22. RIH with 6" bit/scraper and boot basket to cleanout depth of 9545' MD. Circulate hole clean. POOH with work string and lay down. 23. RU wireline and run GR/Junk Basket to cleanout depth (9545' MD). 24. Run wireline set Bridge Plug at 9540' MD 25. Set shallow 7" Retrievable Bridge Plug in casing; change out 3 %2" Pipe Rams to 2 7/8" Pipe Rams and pressure test. Pull Retrievable Bridge Plug. 26. RU Wireline Unit. Pick up 20' Tubing Conveyed Perforating gun, 2 3/8" XN nipple, and 7" X 2 3/8"Packer/Seal Bore Assembly. RIH to set TCP perf guns across interva19504-9524' MD. Tie in TCP gun depth with GR. Set packer at 9450'MD. 27. RIH with Lower Packer Seal Assembly, centralizer, 2 3/8" tubing with Blast Joints across interval 9336-9352' MD, 2 3/a" TCP Gun hung off Ported Y Block to perforate interva19336-9352' MD, Sliding Sleeve at 9250' MD, and 7" Retrievable Packer at 9220'. Run 2 7/8" tubing above packer, 2 7/8" X Nipple 1 joint above Packer. RIH with 2 7/8" tubing string. 28. Make up Chemical Injection Mandrel with chemical injection valve on tubing string; run 1/4" flat pack Methanol Injection line over last 3000' in hole. 29. Stab into lower Packer seal bore at 9450' MD. 30. Pressure Test 1/4" Methanol Injection line. 31. Make up tubing hanger with 1/4" methanol injection line penetration and land tubing. 32. RIH with Slickline and set Equalizing Plug in X nipple above upper Packer. Pressure test Tubing to verify there are no leaks. Pull Equalizing Plug. 33. Circulate annulus to inhibited 3%KCL fluid with 5 bbl diesel cap for freeze protection. Displace tubing completely with 54 bbl diesel. 34. RIH with Slickline and set Equalizing Plug in X nipple in Sliding Sleeve below Upper Packer. 35. Pressure up on tubing to set Upper hydraulic Packer. Pressure test down backside to ensure packer is set. Created by Eric Skaalure Page 2 of 3 C:\Documents and Settings\bill\Desktop\WF#1SSWOsum0607.doc ~ i FOREST OIL CORPORATION W. Foreland #1 Single Selective Completion Workover Summary- 6/7/05 36. Nipple up SM Completion tree and pressure test to 5000#. 37. At this point, the Nabors Rig can be rigged down and moved out. 38. Rig up flow line and choke manifold and prepare to flow well. 39. Pull Equalizing plug from Sliding Sleeve. 40. RIH with Slickline and set Equalizing Plug in XN nipple below bottom packer. 41. Swab tubing to achieve +/- 500 psi drawdown for perforating 42. Shift Sliding Sleeve to Open Position. 43. Activate TCP firing head by pressuring up on Tubing with N2 and perforate interva19336-9352' MD (16' Gun). Flow well until liquid is cleaned up. Shut In well. (Note: Coiled tubing maybe required to nitrogen lift well if it does not flow). 44. Retrieve Equalizing Plug from XN nipple below bottom packer. Shift Sliding Sleeve to Closed position. 45. Prepare to flow well. Bleed pressure off tubing to create +/- 500 psi drawdown at perfs. Activate TCP firing head by dropping bar to perforate interva19504-9524' MD. 46. Flow well for cleanup and Shut In. 47. Rig up Slickline and retrieve TCP Drop Bar. 48. RIH with Memory Pressure Gage on Slickline to obtain SI BHP at 9400' MD. Retrieve pressure data. 49. Release well to production. Created by Eric Skaalure Page 3 of 3 C:\Docuxnents and Settings\bill\Desktop\WF#1SSWOsum0607.doc 11 " 5k PSI _ GK ANNULAR BOP SCREWED HEAD FLANGED BOTTOM CONNECTION 2-1/16" #5000 GATE VALVE 2" CHOKE LINE 2-1/16" #5000 GATE VALVE 3'x2" DSA 11 " 5k PSI _ DOUBLE GATE PREVENTOR 2-1/16" #5000 STUDDED CONNECTION GATE VALVE 2" KILL LINE 11 " 5000# API ~ FLANGED MUD CROSS 11 " 5k PSI °"` HYDRAULIC RAM SINGLE GATE ~ STUDDED CONNECTION 3'x2" DSA NABORS ALASKA RIG 26 S i 1" BLOW-OUT PREVENTOR 3 RAM STACK CONFI RATION 2-1/16" #5000 GATE VALVE Supplemental APD West F rmation ds #2 On August 19, 2004, the BLM i ued a request for addit' nal information from Forest Oil Corporation to supplement its Applicatio or Permit to Drill the est Forelands #2 well. The information requested is provided belo to the BLM and AO C: 1. BOP Test Pre ure The BOPS w' 1 be tested weekly to a low pressure of 500 psi and a high pressure of 5,000 psi. In addition, e BOP stack to be used has been modified since the original APD was filed. Anew BOP d crintion is attached here. 2. G~6logicalInformation he prognosed geological tops are: Tyonek E -7260' TVD(ss) 7400' Sand -7330' TVD(ss) Tyonek F -7935' TVD(ss) GO-Zone -8833' TVD(ss) Upper, -8968' TVD(ss) Lower -9151' TVD(ss) G-Zpne -9300' TVD(ss) 3. Co~iipletion Diagram A'icomp 'on diagram is attached. 4. Check Valve for Kill Line hoke Manifold Forest Oil requests of the BLM a wai from the requirement to incorporate a check valve in the kill line. This well will be drilled in the win ime and the check valve would result in fluids being trapped in the kill line between it and other es. If the trapped fluid freezes it would cause,.! damage to the line and valves on the kill side, resu ing in a compromised well control 1(~ \ _ ~ ~~ ``~ 5. Survey Plat An as-built survey of the West Forelands pad, WF #1 well, existing facilities and the staked location for the WF #2 well was included in the original APD submission. We include here an additional copy of the as-built survey in case the one in the original submission was misplaced. 8/13/2004 ~~.~-~# ~`~~ ~~ ~ 20th ~ ~ ~ ~ ~~ l-~~~ ____________________________ UNffED STATP3 SURVEY NO. 45?5 LOT 1 ~ TYPICAL PIPELINE RELATIONSHIP S~,~i ~; SALA~TGF NATI~rE ~ Q THIS SHEET ~~~ RIGHTS CIRI Z ` aD .~2A, ~~ M~ ~ ' SEE DETAIL 6a~" a,~' G oL -'' ~ ~ ~~e £0~/ fi T M' ~ - -~ OJ WEST FORELANDS PAD #1 ~ ,~ ~ ~ ~ ~-- ~ o\aa i Ooo \ H / V /8 ~N~i J M~Di \ \ 0 ,o €GC€.~ tic'~~' ~~ ~ ~ /rf y~r '~ ~ i /~~~~ / ~ ' ~ //~ ~~ ~/ ~' CENTERLINE EXISTING ROAD // ~ ~ i i ~, ~ q~~k ~ // ~ ~ 90. /~ / ~ 89 8 I I 9 // r I I ~ ~ ~ ~~ ~ ~ ~ ' WES \ ~` i ~~ ~ T FOREHANDS PAD #1 DETAIL 1 "=100' _ WEST FORELANDS ){2 ALT. 92,1 LATINDE: 60'45'53.566" LONGITUDE: -151'43'Si~789' GRID N:2475581.625 GRID E:190482.370 87 7 87.3 WEST FORELAND ~2 , 90 LONGITUDE; -15Y4352.393 88.6 ~ LATITUDE: 60'45'53.559" GRID N: 2475581.625 GRID E:i90452.J70 88.7 TYP. SPOT ELEV. 6 85.6 / EDGE PAD ~QF / / ~0 / Sj ~~ G~f 9 G~~yS~o~/ O; 3e~'`On P / 88.0 SKID W/TK WEST FORELANDS ~1 Q® GRID N: 2475581.625 WELL HOUSE GRID E:7 9041 2 370 89.2 LATITUDE; 60'45'53.548" LONGITUDE: -151'43'53,198" 88.7 a9 BLDG.'S /" ~- -- '., ~ / l /~ ~' SECTION ~, TOWNSHIP ffi~i, RANGE 14W SURFACE OWE SAIAMATGF NATNE ASSOC. 3UBSURFACE RIGHTS Cott SECTIDTi 28, 'I~WNSHIP 8N, RANGE 14W SURFACE OWNERSHIP SALAMATOF NATIVE ASSOC. SU&RURFACE RIGHTS C1Ri NOTES I) BASI5 OF COORDINATES IS FlRON THE CONiINUWSLY OPERATWG REFERENCE STATION NENR NEAR KENAI, ALA9fA. COORDINATES SRIOMI HEREON ARE AUSKA STATE PLANE NAD 27 ZONE 4, 2) BEARINGS SFWWW7 ARE GRID AND ARE BASED ON REPEATAAIE OPS OBkRVATIONS BETWEEN THE 2 INCH ALUM%4UM CAPPED MONUMENTS SET NEAR TH€ BLUFF ONE ON EITHER SIDE OF fHE PIPELINE ALIGNMENTS WHERE THEY COME ON 940AE FROM THE OSPREY PLATFORM. 3) STANC4l%IC SHONN HEREON IS BASED ON THE ASBUILT LOCATION OF THE 8' ql LINE f~VSTRUCTEO IN 20D2. STARaJINC BECMIS ki THE WESTERN MOST lEG OF THE OSPREY PLATFORM (STARON 0+00) PNO CONRNUES TO THE NORTH BOUNDARY ~ UNITED STATES SURVEY N0. 4520 AMENDED (MOSWITO ALLOTMENT). 4) EASEMENT CENTERLINE BETWEEN THE NHN1. aF COgS INIEi AND 1HE WEST MCARIHUA FAgLITY SHOWW HEREON IS NOT BASED ON ANY PIPELINE CENTERLINE, BUi WAS PLACED SO THAT ALL REQUIRED PIPLINES WOULD FALL N9TNIN THE EASEMENT WROTH. FRaRI 1HE WEST MCARTNUR FACILITY NORRI TO THE NORTH BOUNDARY OF UN111O) STALES SURVEY N0. 4520 PAIENDED, THE 80' EASEMENT SHOWN NEREON SfRARES ITS EAST EDGE WITH THE E%ISRNG 1995 20' qRl EASEMENT. THEREFORE, IT LIES DIRECTLY ADJACENT AND NESIERLY OF THE EpSRNC 1995 CIRI EASEMENT. 5) DISTANCES SHOWN HEREON ARE GRID. 6) THE PR~ERTY BOUNDARIES SHOWN HERON WERE NOT REIRACEO IN R1E FIELD DUR9NG THIS SURVEY PNO ARE BROWN FOR INFORNARONAL AND COMPUTATIONAL PURPO~S ONLY RTE LNES SHOWN HEREON REPRESENTING THE BEGINNING A.NO THE END OF THE EASEMENT ~SCPoPRONS AT BOTH CENTERLINE AND EDGE OF EASEMENT SHALL BE E%TENOED OR SHORTENED TO TERMINATE QR BEGIN AT 1HE TRUE PROPERTY BOUNDARIES 7) SECTION LINES SHOMN HEREON ME PAOTRACiEO. B) SURVEY CONDUCTED BY MCLANE CONSL7,RNG CROUP DURING CONSTRUCTION OF PIPELINES WRING SUMMER 4002. 9) THE FIBER OPRC LINE INSTALLED IN 2002 IS NOT SHOWN GRAPHICALLY HEREON AND ITS LOCATION WAS NOT PHYSICALLY LOCATED. FROM THE B~ SITE TO FOREST OIL FEE PROPERTY (STATION 94+47 i0 STATION 152+02) THE flB€R OPTIC llt~ WAS INSTALLED BEINEEN TtR[ 8" OIL LINE AND THE 6' GAS UNE. FROM FOREST ql fEE PR~EAIY HEADING NORTH TO YA;.ST FORELANDS >M PhD (STARON 224+43 TO 51A1I0N 370+00) THE flBER OP11C LINE WAS INSTALLED BETWtiEN THE 6" GAS LINE AND THE AOAO SHWLDER. FROM NEST FfNtELAN05 /i PAD TO THE TRADING BAY PRODUCTION FACILITY (STATION 370+00 TO 603+75) iFE FNRER OPRC LINE WAS INSTALLED BEIY~EN THE 8" GAS LINE AND THE B" OIL LJNE RI14 N ~', ~~ ~ ~ R;,; i e O e ,~ o Qi =_ O ~ `! oz~'N N Ua o ~_ Oo~ ~H a ~~ p~ (~ ~ ~S d m ~~ ~T ~ z~ m ~& ~ Y 'u N (2 ~~ *~A ~S ~ ~a W DRAWN BY PCD CHEgcED BY HQRZ, SCALE 1' ~ 2~' YEAt. sca,E I" . 20 gtN'f Np. 043058 SHEET 1 S~~~Ul~~, ~~T 0 ~ 2a~~. [Fwd: [Fwd: Surveyed Location for WF#1)) • Subject: [Fwd: [Fwd: Surveyed Location fa WF#1]] From: Stephen Davies <steve_davies@admin.state.ak.us> Date: Thu, 02 Sep 2004 18:20:27 -0800 To: Jody Calomhe <~ody colomhie~}a admin.sta~e.ak.us>, Boh Fleckenstein <t~ab fleckenstein~a admin.state.aic.us> Jody, Please put a copy of this in the West Foreland #1 well file. Bob, Please enter the updated surface location in RBDMS, and make note of the change in the comments box under the RBDMS General tab for West Foreland #1. -------- Original Message -------- Subject: [Fwd: Surveyed Location for WF#1] Date: Wed, O1 Sep 2004 10:04:18 -0800 From: Thomas Maunder <tom maunder@admin.state.ak.us> Organization: State of Alaska To: Steve Davies <steve davies@admin.state.ak.us> Steve, Here is the note from Bill Penrose regarding the "location change" of WF #1 due to the more modern survey. Is this sufficient to change the location in our records?? I will have to check if Forest has submitted the survey obtained on WF #1. Tom -------- Original Message -------- Subject: Surveyed Location for WF#1 Date: Tue, 31 Aug 2004 16:29:22 -0800 From: Bill Penrose <billQfairweather.com> To: tom maunderQadmin.state.ak.us CC: RLSmithQforestoil.com Tom, Since Forest Oil recently had its West Forelands pad surveyed and an as-built constructed, you asked me to compare the newly surveyed location of the WF#1 well with the location contained in your records as submitted by the previous operator and inform you of any significant location change. It appears that there is in fact a significant difference between the two as indicated below. I suggest you use the new location resulting from this recent survey as we know it was performed well and by a qualified surveyor as opposed to the unknown source of the original information from the previous operator. Your files show a surface location for the WF#1 well of 670' FEL, 879' FSL, Sec 21, T8N, R14W, SM. The new survey (attached) gives all of the coordinates in Latitude/Longitude and Alaska State Plane, but the surveyor converted these to section line offsets (based on protracted section line values) for me, resulting in a location of 613' FEL, 878' FSL, Sec 21, T8N, R14W, SM. The difference is about 66'. Again, we know the provenance and quality of the new survey and I suggest it be used as the official WF#1 location. Regards, Bill t of 2 9/8/2004 10:39 AM [Fwd: [Fwd: Surveyed Location for WF#1]]. _ _ _- _ Content-Type: application/octet-stream Asbuilt-WFU- PAD-7-25-04.pdf Content-Encoding: base64 2 of 2 9/8/2004 10:39 AM ~ r a~ _ _ _ _ ~~ ~' ,~ . . ~,., 2 - ,-* `' 4 L^e oa s ~' f ~"e k `".~ i~3 ~ i ~~t t '^F f (S `' ~a ` ~ 6`° ~ s ~~ [ ~ t %. f t ~ 3 3 j°r ~ i ~ ~~ i ! (; i ~~ I j ~ - ~.~ [ , ~ ~ €~ 1 { 3 ~ f` ~ ,`1 ~ ~ ~ ,~ _~ :~ ~; :,~ £~;"?~ FRANK H. MURKOWSKI, GOVERNOR ~:' ~r ~ ~ i ,~LASSA OIL A11TI) ~~ 333 W. 7TM AVENUE, SUITE 100 COlITSERQATI011T CO1rIIriISSIOI~T ;'~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 278.7542 June 23, 2003 Jim Arlington Forest Oil Corporation 310 K Street, Suite 700 Anchorage AK 99'501 Re: West .Foreland # 1 well, West Foreland Field Dear Mr. Arlington: As you know, in response to your letter of June 16, 2003, the Commission has tentatively scheduled a hearing on July 25, 2003, to consider making the temporary spacing exception for the above-referenced well permanent and approving an allocation of production between the affected leases. Your letter also requested that the Commission extend the temporary spacing exception that expires July 1, 2003, until the time that the Commission issues its order approving the allocation and providing for disbursement of funds from the escrow account that is required under Conservation Orders Nos. 450 and 450-A. The procedures for granting spacing exceptions include public notice and opportunity for hearing. In the past the Commission has considered that these procedures also apply to the extension of a previously granted temporary exception, as occurred in Conservation Order No. 450-A. It is regrettable that your current application was not submitted in time to allow for the notice and hearing process to be completed before the temporary exception is due to expire. Please ensure that future applications for Commission action take adequate account of the time required for orderly compliance with applicable administrative procedures. In this instance, the escrow arrangements relating to production from the West Foreland # 1 well, which will continue in effect under the requested extension, should protect the interests of those who might be affected by an extension of the temporary spacing exception. In addition, you have indicated that the parties that are entitled to personal notice under 20 AAC 25.055(d), namely the Department of Natural Resources ("DNR") and the Bureau of Land Management West Foreland # 1 wc,~!West Foreland Field r June 23, 2003 Page 2 of 2 ("BLM"), consent to the requested extension. Accordingly, if you submit to the Commission written statements from DNR and BLM signifying their consent or non-objection to the requested extension, the Commission will consider that substantial compliance has been performed with respect to the applicable procedures for notice and opportunity for hearing as to the request for an extension of the temporary spacing exception. These statements should be submitted as soon as possible but in no event later than June 30, 2003. Sincerely, ~, arah H. Palin Chair cc: Mr. Gary Carlson Vice President Forest Oil Corporation Gp~~~i ~ ~ ~ ~%~ ~~ ~ ~~~ ~d~f ~~ ~ ~~~~ ~ ~~ ~ ~ • • To: R Christenson From: Bob Crandall Subject: AOGCC Records of the Pan Am West Forelands No. 1 Well Attachment no. 1 is the original permit to drill, details of the permit indicate the well was intended to be an exploratory oil well. Attachment no. 2 is the original survey plat. This shows the well was located with an appropriate setback from section lines for an oil well. Attachment no. 3 is an index of CO's issued by the Commission. It shows the commission was issuing spacing exceptions for wells on Federal leases at the time the WF# 1 was permitted. Attachment no. 4 is the case file abstract for ADL 359112 which shows the property became a state oil and gas lease in 1983. The WF # 1 should have had a spacing exception originally if the current property boundary existed when the well was permitted. It may have been that the exact location of the shoreline had not been established, but I doubt Pan Am would have drilled a wildcat a few hundred feet from open acreage. These considerations while interesting don't matter here anyway because the WF # 1 discovered gas not oil. The standoff for gas is 1500 feet and the well is within that distance from a property boundary where ownership changes. Let me know if I can be of assistance. APPi.ICATiON FOR PERhAIT TO DF:ILL, DEEPEN O APPLICATION TO DRILL ZC] NAME OF COMPANY- OR OPERATOP. pale Aaeerican Petr©leum Corporatioc~ DATE Septes~ser 27, ].461 state Canada Addres^, 4+44 -Seventh Avenue S ,W . city Calgary, Alberta DESCRIPTION OF «'ELL AND LEASE Name of lease ?'ell location West Foreland Field &, reservoir (If wildcat, so state) Wildcat Distance, in miles, and direction from nearest town or Post office Nearest distance fron-: Proposed location Distance from proposed location to nearest drilling, to Property or lease line: I completed or applied-for well on the same lease: feet Proposed depth' I Rot2ry or cable tools 1Pprox. date ~~~ork will start 1k,000' Rotary - Number of acres in lease: I Number of v; ells on lease, including this well. completed in or driiling to this reservoir: I ~On$ _- _ - If lease, purchased with one or more Name Address ~i~ells drilled, from whom purchased: Status of bond $15{3,Ot3a ~atiou~~ide Bead on file is Central Watiomaide Soad File - $L17, gash.--_ifl.C• Remarks: (If this is an application to deepen or plug back, briefly describe work to he done, giving present producing zone and expected new producing zone) ee atta.ched Forte 46-~ for. ~a<ropos~ 3o~r*ings ~,u~i, rnd ~~ pro~affi, ~lo~resut prev~ati.on aqu3pt~ent alt. be inst:~i.ed is ~iccoadnnae Frith the ett~:chmant„ footer loan. dioa kill b~~ fsha~ ugan oc,~plet~.csn of gtottt~ surva~g. feet Div.Drig CERTIFICATE: i, the undersigned, state that I am the Supt' of the p~ American petrQleumGarp. (company), and that I am authorized by said ccmpany to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to //~, ~ c the best of my knowledge. / e/" ~~~~~ `~ Signature-- ).9 -6l Permit Number: Approval Date: ~CtOber 1961 Approved By: '~' Chief, Petroleum Branch Notice: Before sending in this form be sure that you have given all information requested. Much unnecessary correspond- ence will thus be avoided. See Instruction on Reverse Side of Form I ~i-ell number Elevation (ground) l I1©(? f't-• a~bo~o'!- aes lea (give footage from section lines) Section-township-range or block & survey NE-SS-Sec.a1, ~+p.8N, age. 14~= Seward ;!!arid ~ County UG 6ACIC DEEPEN ^ PLUG BACK ^ Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. 1 Effective October 1, 1958 ~.~f ~ ~-ni ~ ~+.tnos' Nt~'~ ;~ '6L8 /~ sQ /vN ~ ~0'~I 1~~M .fir ES-,/~, SZ ~ " -~ ~b'~f `i~'; N cc1 h o ~ ~\ ALASKA OIL & GAS CONSERVATION C0~4I~1I SSION DATE 10/14/1999 INDEX OF COs, AIOs, & DIOs PAGE 1 FIELD --------------- ORD --- ER # ISSUE DATE OPERATOR DESCRIPTION CURRENT EXPLORATORY 001 -------- ---------- 08/07/1958 ---------- STATE - --------------------- Adoption of amended ------- n regs. KENAI 002 04/30/1959 UNION Spc exc, Well - n Kenai Unit #14-6. After a public hearing and an emergency order. KENAI 003 10/30/1959 UNION Spc exc, Well - n Kenai Unit #34-31. Emergency order #3 issued 10-17-59. SWANSON RIVER 004 04/04/1960 SOCAL Spc exc, Well - SCU n #32-4. SWANSON RIVER 005 11/25/1960 SOCAL REVOKED. Temporary n 80 acre for Hemlock zone. EXPLORATORY 006 10/20/1961 SUPERIOR Spc exc, Well- n Chuit State #1. EXPLORATORY 007 11/15/1961 PAN Spc exc, Well - n AMERICAN Stedatna Creek St. #1. SWANSCN RIVER 008 05/11/1962 SHOAL REVOKED. Permanent n 80 acre for Hemlock zone. SWANSON RIVER 009 05/11/1962 SOOAL REVOKED. Gas n injection into Hemlock. MIDDLE GROUND 010 05/31/1962 PAN Spc exc, Well - MGS n SHOAL AMERICAN State #1 COOK INLET 011 06/21/1962 PAN Spc exc Cook Inlet n AREA AMERICAN State #1. NORTH COOK 011 06/21/1962 PAN Spc exc for #1 Cook n INLET AMERICA:~1 Inlet. MIDDLE GROUND 012 05/23/1963 PAN Spc exc, We11 - MGS n SHOAL AMERICAN State #2. MIDDLE GROUND 013 08/26/1964 PAN Spc exc, Well - MGS n SHOAL AMERICANI State #6. TYONEK 014 08/18/1964 HUMBLE Spc exc, Well - n Tyonek Reserve #1. MIDDLE GROUND 015 04/05/1964 PAN Spc exc, Well - MGS n SHOAL AMERICANI A-42-11. KENAI 016 04/21/1964 UNION REVOKED. Temporary n 320 acre spacing. MOQUAWKIE 017 05/12/1965 MOBIL Spc Exc, Well - n Moquawkie #1. NORTH SLOPE 018 10/11/1965 SINCLAIR Spc exc, Well - n AREA Colville #1. EXPLORATORY 019 11/12/1965 ATLANTIC Spc exc, Well - n REFINING Federal #1. Page: 1 Document Name: ~1ed , N126 DEPARTMENT CF NATURAL RESOURCES 02/C3/2000 15:46:56 NLM1260P CASE FILE ABSTRACT PAGE: 2 OF 61 FILE: ADL 359112 NEXT: N SEE LAND DATP_? (Y/N) N FORM NUMBER DNR 10-i14~1 7/83 R CONDITIONAL Y/N '-~' PRIMARY TERM 7 WCR.CCOMMI ' TERM 0 . 0 09-28-1983 INITIAL OWNER SEGMENT CODE 1 CID NUMBER WAGNER, RICHARD E WORKING INTEREST % 100 ROYALTY INTEREST o 87.5 09-28-1983 INITIAL OWNER SEGMENT CODE 1 CID NUMBER SALE 40 ~r7ORKING INTEREST % 0.0 ROYALTY INTEREST % 12.5 v9-28-1983 BID RECEIVED ~~ATUS (12) BID RECEIVED ENTER-PFl---PF2---PF3---PF4---PF5---PF6---PF7---PF8---PF9---PF10--PF11--PF12-- HELP EXIT REFRSH PRINT PGUP PGDN NLAS __ RETURN ----- --. ------- - - _ 4 / 8 ~- 2 Sess-1 146.63.51.196 Date: 02/03/00 Time: 15:46:18 .~ ~oevxlshr~o glt~ -1~c~ ~6 M:lcc x 6 M;I+~s~ `~ , j''~rti,li vim, .. ~ ~ o1So ~ros~ ~ L:~ve. Ajo~orox. ~ ~~~ ~ a.~. ~t~rr,~-R~v~'1 F~~~ 1 ~ Lr.4 a ~ R-o35o17 ~ csRt ? .~' • ~I~OL'359It1 -E-'r Safe. L~.at ~ ~ ~9DG 33 X112. t ~cvra7t ~.~a..,als ~.~ ~-~ ~~I a pp~wc f?'oo~' Forest Oil Corporation ~~, 310 K Street, Suite 700 Anchorage, Alaska 99501 (907) -258-8600 Fax: (907) 258-8601 ,~~~~~ May 3, 2002 Alaska Oil and Gas Conservation Commission 333 W. 7"' Avenue, Suite 100 Anchorage, Alaska 99501 Attn: Mr. Tom Maunder Re: West Forelands # 1 -Install Down Hole Choke Mr. Maunder, Forest Oil requests to re-enter West Forelands # 1 gas well with slick line in order to install a down hole choke. This choke is necessary to prevent hydrate freezing problems in the well. Attached please find the 10-403. If there are any questions, please contact meat 907-258-8600. Ted Kramer Production Manager -,Alaska Division Forest Oil Corporation "~~t~~ " ~ ~ u ~:, ~. ~~. _ .9 ~- a~'ta ~°~ ~1flC~°tOCcttl~ Date Modified: O/0100 Date Prepared: 5/3/02 t Document1 . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: _ Alter casing: Repair well: Plugging: _ Time extension: _ Stimulate: _ Change approved program: Pull tubing: Variance: Perforate: Other: X -Add Dnhole Choke 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Forest Oil Corporation Development: X 90' KB feet 3. Address Exploratory: 7. Unit or Property name 310 K Street, Suite 700 Stratigraphic: West Foreland Well #1 Anchorage, Alaska 99501 Service: 4. Location of well at surface 8. Wetl number 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. #1 At top of productive interval 9- ' 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. 6 -~~ At effective depth 10. API number 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. 50- 133-10028-00 At total depth 11. Field/Pool 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. West Foreland 12. Present well condition summary Total depth: measured 13,500 feet Plugs (measured) true vertical 13,500 feet Effective depth: measured 9,475 feet Junk (measured) true vertical 9,475 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 84' 20" N/A 84' 84' Surface 1,945' 13 3/8" 1500 sx 1,945' 1,945' Intermediate 7,360' 9 5/8" 1400 sx 7,360' 7,360' Production Liner Perforation depth: MD and TVD (11,122'-11,134' sq) (11,074'-11,082' sq) (11,044'-11,056' sq) (10,952'-10,976' sq) (10,194'-10,224' sq) (9,504'-9,524' sq) (9,688'-9,710' sq) (9,550'-9,570' sq) (8,918'-8,920' sq) (8,505'-8,526' sq) (7,666'-7,688' sq) (7,440'-7,442' sq) (7,370'-7,390' sq) (9,042'-9,062' sq) (9,336'-9,341' w/ 2 spf, 9,341'-9,352' w/ 4 spf) -Open Tubing (size, grade, and measured depth) 2 7/8" 6.5 # @ 9,273' MD / TVD Packers and SSSV (type and measured depth) Model D Packer on Tubing @ 9,272' MD / ND 13. Attachements Description summary of proposal: X Detailed operations program: BOP sketch: 14. Estimated date for commencing operation 15. Status of well classification as: 10-Ma -02 16. If proposal well verbally approved: Oil: _ Gas: X Suspended: _ ~ Name of approver Date approved Service: L t the foregoing is true and correct to the best of my knowledge. 17. I hereby certify th a ~ / ~ 1 ~ed Kramer Title: Production Manager Date: 05/03/2002 Signe ~ Z ~ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness ~ Approval No. Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~ ~.,,. 2' ` ~ 6 ~~ r 0 ~ ~ ~ ~ S Approved by order of the Commissioner Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE r~ ~ ~ ~~ - i 4 forest Oil Corporation 310 K Street, Suite 700 Anchorage, Alaska 99501 (907) -258-8600 Fax: (907) 258-8601 /~~'YY~~ May 3, 2002 Alaska Oil and Gas Conservation Commission 333 W. 7"' Avenue, Suite 100 Anchorage, Alaska 99501 Attn: Mr. Tom Maunder Re: West Forelands # 1 -Install Down Hole Choke Mr. Maunder, Forest Oil requests to re-enter West Forelands # 1 gas welt with slick line in order to install a down hole choke. This choke is necessary to prevent hydrate freezing problems in the well. Attached please find the 10-403. If there are any questions, please contact me at 907-258-8600. Ted Kramer Production Manager -,Alaska Division Forest Oil Corporation ~~~.~°~~ ~} ~~ [~ g ~D~? Alaska Oi! ~ Anchorage ornm~ss~oi+ 05/06/2002 15:2/ FA1i 80 i 258 81301 FOREST OIL ALASKA ` ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS [7j 002 o,s ~f~ S 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter Suspended well: Alter casing: Repair well: Plugging;Time extension; _ Stimulate: Change approved program: pull tubing: Variance: Perforate: Other. X -Add Dnhole Choke 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Forest Oil Corporation Development: X 90' KB __ feet ~ 3. Address F~cploratory: ~ 7. Unit or Property namQ 310 K Street, Suite 700 _ 5traiigraphic: _ West Foreland Welt #1 Anchorage, Alaska 99501 Service: • d. Location of well at surface 8. Well number ~ 860' FSL, 671' FEL, Section 21, TBN, R14W, S.M. #1 ~- At top of productive interval ~ _ __._ 3,;~'~rmit number / d' .880' FSL, 671' FEL, Section 21, TBN, R14W, S,M, ;.:~1 ..~~. - At effective depth - ~ _ 10: APf nurhber 880' FSL, 571' FEL, Section 21, TBN, R14W, S.M, 50- 133-10028-00 T At total depth 11. Field/Pool ~ 880' FSI, 671' FEL, Section 21, TBN, R14W: S.M. West Foreland 12, Present well condition summary ~ ,~, ~ ~ " .+ y ~ T~,q ~ p ~ " ~ ~ t4.~ Total depth: measured 13,500 feet. Plugs (measured) ~ ~ ~«~~ __ . _ _ _ /f true vertical 13,500 feet n ~i ~..~ ~ Effective depth: measured 9,475 feet Junk (measured) ' ~ "'"` ~ true vertlcal 9,a?5 feet Casing Length Size Cemented Measured depth Tru9 vertical depth Structural Conductor 84' 20" N/A 84' B4' Surface 1,945' 133/8" 15WSx 1,945' 1,945' Intermediate 7,360' 9 5/B" 1400 sx 7,364' 7,360' Production Liner Perforation depth: MD and TVD (11,122'-11,134'sq) (11,074'-11,082' sq) (11,044'-11,D56'sq} (10,952'-1D,976'sq) (1Q,194'-1Q,7.24'sq) (9,504'•9.524' sq) (9,688'-9.710' sq) (9,550'-9,570' sq) (8,918'-8,920' sq) ($,505'-8,526' sq) (i,668'-7 668' sq) (i,440'-7,442' sq) (7,370'-7,390' sq) (9,042'-9,062' sq} (9,336'-9,341' w/ 2 spf, 9,341'-9,352' W/ 4 spf) T Open'. Tubing (size, grade. and measured depth) 2 718" 6.5 # ~ 9,273' MD / TVD Packers and SSSV (type and measured depth) Model D Packer on Tubing @ 9,272' MD / TVD ~ ., . 13. Attachements Description summary of proposal: X Detailed operations program: BOP skplch; 14. Estimated date for commencing operation 15. Status of well classification as: 10-Ma -02 16. If proposal welt verpally approved: Oil: Gas: X Suspended; Name of approver Date approved Service: _ 17. I hereby certify that the forego ing is Irue and correct to the best of my knowledge. 2 ~~~ Signe ~ T'`Ted Kramer Title; Production Manager Date: 05/03/2002 FOR GOMMI5510N USE ONLY T ^ _ Gonditions of approval: Notify Commission so representative may witness Ap royal No.~ Plug integrity BOP Test Location clearance ~ c~ ~ ~ ~ ` _ Mechanical Integrity Test Subsequent form required 10-_~ pngtnal Stgned By Cammy Oech~l7aylot Approved by order of the Commissioner Commissioner .Date ~~ Form 10103 Rev 06/15/613 SU@MI'T 1N TRIPLICATE ORi~~. M • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CONIMISSION 333 West Seventh Avenue, Suite 100 Anchorage Alaska 99501 Re: APPLICATION OF FOREST OIL CO. ) (successor to Forcenergy, Inc.) for an order ) amending Conservation Order No. 450, granting ) an exception to the spacing requirements of ) 20 AAC 25.055 to allow for production from ) the West Foreland #1 gas well. ) TT APPEARING THAT: Conservation Order No. 450-A West Foreland Field Apri123, 2001 1. The Commission issued Conservation Order No. 450 on July 24, 2000, granting Forcene ;~:: ("Forcenergy") a temporary spacing exception to allow for gas production from the ' from the 9336'to 9352' (measured depth) interval, subject to the terms and con 'tions set out in at order. 2. Forcenergy submitted an application dated November 30, 2000, for an order amending Conservation Order No. 450 to, among other things, revise the date by which Forcenergy must deposit funds in an escrow account. Notice of hearing on this application was published in the Anchorage Daily News. on December 6, 2000, pursuant to 20 AAC 25.540. Actual notice was also given to the Department of Natural Resources ("DNR") and the Bureau of Land Management ("BLM"). 3. No protests to the application were received. 4. Forest Oil Co. ("Forest") has succeeded to Forcenergy's interest in this matter. 5. A hearing was held on January 9, 2001, at which representatives of Forest appeared.. FINDINGS: 1. Lease A-035017 and Lease ADL 359112 (collectively referred to below as the "Leases") provide for .royalties to be paid to the respective lessors by the last day of the month that follows the month of production. It will be administratively more practicable to use the same deadline, rather than the 10th day of the month following the month of production, for deposits into an escrow account pursuant to the provisions of Conservation Order No. 450. 2. Data gathered from gas production for a period of at least two years is likely to allow a more accurate allocation between the Leases than production for the shorter period contemplated in Conservation Order No. 450. DNR and BLM are amenable to deferring an allocation determination until after such. additional data are available. 3. Forest will consider producing gas from one or more additional intervals beyond the interval described in Conservation Order No. 450. 4. Contrary to the information previously provided to the Commission, Forest is not the sole working interest owner of the Leases. Phillips Petroleum Co. or an affiliate has an interest in zones below a certain depth. That depth is not less than 9,527 feet (measured depth) in the West Foreland #1 well. ~ Conservation Order 450-A Apri123 2001 p Page 2 CONCLUSIONS: 1. The spacing exception granted under Conservation Order No. 450 should be extended until July 1, 2003, and should cover gas production from any interval not deeper than 9,527 feet measured depth in the West Foreland # 1 well. 2. Forest should be allowed until the last day of the month to deposit funds based on the previous month's production under the escrowprovisions of Conservation Order No. 450. NOW, THEREFORE, IT IS ORDERED: 1. Conservation Order No. 450 is amended. consistent with the foregoing. 2. The spacing exception granted by Conservation Order No. 450, as amended, expires July 1, 2003. The spacing exception granted by Conservation Order No. 450, as amended, covers gas production from any interval not deeper than 9,527 feet measured depth in the West Foreland #1 well. Forest shall conduct appropriate production testing and provide the Commission with geologic and geophysical data and the results of the production testing to support a reasonable inference as to what proportions of the gas reserves producible from each accumulation down to that depth underlie Lease A-035017 and Lease ADL 359111. 4. The deadline for escrow deposits under Conservation Order No. 450 is changed from the 10"' day to the last day of each month for production during the previous month. DONE at Anchorage, Alaska and dated Apri123, 2001. ~,5 ~~~° ~' ~ ` ~ ~~ a t~~. ~E t.~ i=/ k . ": J ~ ~ .~: ~% ,_. r t ~ '~~ Q 1 ~~1 ,~ . ~ ~k~~' L~ ~ ~~~~~ ~~.N L~ Cammy Tay r, Ch Alaska Oil and Gas Conservation Commission Darnel T. Se t, Commissioner Alaska Oil and Gas Conservation Commission au.tta~ M . Newne/ Julie M. Heusser, Commissioner Alaska Oil and Gas Conservation Commission AS 31.05.080 provides that within 20 days after receipt of written notice of the entry of an order, a person affected by it may file with the Commission an application for rehearing. A request for rehearing must be received by 4:30 PM on the 23rd day following the date of the order, or next working day if a holiday or weekend, to be timely filed. The Commission shall grant or refuse the application in whole or in part within 10 days. The Commission can refuse an application by not acting on it within the 10-day period. An affected person has 30 days from the date the Commission refuses the application or mails (or otherwise distributes) an order upon rehearing, both. being the final order of the Commission, to appeal the decision to Superior Court. Where a request for rehearing is denied by nonaction of the Commission, the 30 day period for appeal to Superior Court runs from the date on which the request is deemed denied (i.e., 10th day after the application for rehearing was filed). aoo~-~~3 -~ ~\~~~Qg Ik'~ni} gjlflQisg7~-- N ht~ Tomcat Exploration Well West Forelands Area, Southcentral Alaska Overview The proposed project included drilling an onshore oil and gas exploration well in the West Forelands area of Southcentral Alaska. The project includes: • Construction of an access road and drilling pad • Mobilization of a land-based drilling rig to the site and drilling an exploration well for oil and gas. • Onsite solidification of drilling effluents for possible beneficial use. The following sections provide additional information on specific aspects of the proposed project. Access Road Access to the site will primarily be by road from the general Trading Bay area. Roads currently exist between the Trading Bay Production Facility and the West McArthur River Unit (see Figure 1). This local road system is currently being extended under existing permits from the West McArthur River Unit to the West Forelands #1 well site. The proposed project will include construction of approximately 3.5 miles of new access road from the West Forelands #1 well site in a general southerly direction to the proposed Tomcat drill site (see Figure 1). The access road will nominally be about 16 feet wide at the top and 20 feet wide at the base and will be constructed of gravel approximately 2 feet thick. Gravel will be obtained from local gravel sources, including possible new potential sources identified along the access road route. Wetlands inventory maps for the area indicate that the entire route is located within uplands areas. Stream crossings are currently not anticipated for the access road. Well Location The proposed location is located at the south side of the West Forelands in the vicinity of the former native community of Kustatan. The geographic coordinates of the surface hole location are as follows: Latitude/Longitude: 60° 43' N, 151 ° 45' W Map Location: T 7 N, R 14 W, Sec. 9, NW'/4 USGS Map: Kenai (C5) Quadrangle Land Ownership The access road lies primarily within native lands owned by the Salamatof Native Corporation. The proposed drill site and a portion of the access road will be on native lands currently being purchased by Forcenergy Inc. lGl-oy9 ~f-' s w,n~ ~~ 08/13/99 RPB • • Water Supplies Water to support drilling operations will be obtained locally either from an existing surface water source or new groundwater source. Drilling Effluents Drilling mud and cuttings will be solidified and used for beneficial reuse at either the Tomcat location, West Forelands #1 or West McArthur River Unit. Schedule The preliminary schedule for the project is as follows: Date September/October 1999 June/July 2000 August/October 2000 Activity Submit permit applications Construct access road/drill site Drill/test exploration well 08/13/99 RPB 2 • ~ Figure 1. Tomcat Exploration Well Project Location Map. 08/13/99 RPB 3 Re: [Fwd~est Forelands Gas Well] Subject: Re: [Fwd: West Forelands Gas Well] Date: Mon, Ol Nov 1999 13:21:28 -0900 From: Robert Crandall <Bob_Crandall@admin.state.ak.us> ~q, p~ ~ Organization: DOA-AOGCC To: Robert Christenson <Robert Christenson@admin.state.ak.us> Bob I spoke with Forcenergy about this last week. This well is unusual because it's located within 1500' of a lease line, which came into being after the well was drilled. The lease line here conforms to the shoreline and not section lines. The original well did not require a spacing exception, the well was drilled, was a gas discovery and was shut in for some thirty years. Then the Feds gave a bunch of land in the area to the state with the shoreline being the boundary between state and federal land. The well was onshore within a couple of hundred feet of the shoreline. Ciri later got the onshore mineral rights. As I told Forcenergy, what's important here is the correlative rights issue of producing a gas well within a couple of hundred feet of a property boundary. Clearly the state will have to recieve it's share of any production because the well WILL DRAIN STATE ACREAGE. I told Forcenergy they will have to eventually reach a accommodation with the state about this and that it would be in they're own best interest to being to negotiate with the state and obtain a spacing exception prior to producing the well. The NEW REGS do not talk about section lines but rather talk about property lines, there is no question that under the NEW REGS a spacing exception will be needed. See 20 AAC 25.055 (2) RPC Robert Christenson wrote: > and the answer is ...................... > Subject: West Forelands Gas Well > Date: Mon, 1 Nov 1999 09:56:14 -0900 > From: "Bill Uan Dyke" <William Vandyke@dnr.state.ak.us> > To: "Bob Christenson" <Robert_Christenson@admin.state.ak.us> > CC: "Carol" <cdl@dnr.state.ak.us> > Forcenergy is contemplating producing the old Pan Am gas well located on the > West Forelands. The well is almost on the lease line and almost on the > section line and on a CIRI lease managed by the federal gov. There is a > state lease immediately adjacent to the well. Wi11 Forcenergy need a > spacing exception or pooling order from the Commission to produce this well > given that it is on a CIRI lease managed by the BLM? I assume that since > CIRI owns the mineral rights it is not considered a federal property. Even > if it is considered a federal property wouldn't Forcenergy still need the > spacing exception? > Bill Van Dyke > Petroleum Manager > Division of Oil and Gas 1 of 2 2/1/00 3:27 PM Re: West Foreland # 1 water disposal ~ ~ 6!'fd ~- Subject: Re: West Foreland #1 water disposal Date: Thu, 26 Aug 1999 08:24:05 -0800 From: Blair Wondzell <Blair_wondzell@admin.state.ak.us> Organization: State of Alaska, Dept of Admin, Oil & Gas To: Paul White <PWhite@forcenergy.net> CC: Robert Crandall <bob_crandall@admin.state.ak.us> Paul, Your question is "can the water from the West Foreland #1 gas well be disposed of into the WMR #4D well?" Since DIO #16 refers to the disposal of Class II fluids, without restriction to source, subject fluids can be properly injected in to WMR well #4D (and also into WMR well #D-1, DIO #7) Blair Wondzell 8/26/99. Paul White wrote: > Mr. Wondzell, As you know Forecenergy has purchased the West Foreland #1 gaswell from Phillips Petroleum Co. We are planning the facilities, road and pipeline to deliver gas to West McArthur river, Trading Bay and McArthur River for fuel gas needs. Our facilities will consist of a split pass line heater, a seperator/scrubber and a glycol dehydration unit. The produced water from the seperator we would like to inject in our West McArthur River injection well #4(D). This is essentially the same process Arco and Unocal are using in the Beluga River field. Do you see a problem with this plan? Please advise. > Cordially, Paul White 1 of 1 8/26/99 8:25 AM Forcenargy's~Torn Cat #1 Pre-application meeting. M Subject: Forcenergy's Tom Cat #1 Pre-application meeting. Date: Wed, 18 Aug 1999 13:08:39 -0800 From: "Gene Pavia" <GPAVIA@jpo.doi.gov> To: <Bob_Crandall@admin.state.ak.us> , <Wendy_Mahan@admin.state.ak.us>, <mwr@anc.dnr.state.ak.us> , <glandua@borough.kenai.ak.us>, <SFisler@borough.kenai.ak.us> , <buzk@dnr.state.ak.us>, <Judy_Bittner@dnr.state.ak.us> <karleeg@dnr.state.ak.us>, <kmo@dnr.state.ak.us> , <Michele_Jesperson@dnr.state.ak.us> <BFristoe@envircon.state.ak.us> , <CCrosby@envircon.state.ak.us> , <JBaumgar@envircon.state.ak.us> , <jmcdonag@envircon.state.ak.us> , <JSautner@envircon.state.ak.us>, <LOgar@envircon.state.ak.us> , <MMunger@envircon.state.ak.us> , <PMclarno@envircon.state.ak.us> , <RWatkins@envircon.state.ak.us> , <TMoore@envircon.state.ak.us> , <rockwell.theodore@epamail.epa.gov> , <donmc@fishgame.state.ak.us>, <markf@fishgame.state.ak.us> , <Gary_Wheeler@fws.gov>, <G1enn Gray@gov.state.ak.us> , <Jeanne.Hanson@noaa.gov>, <matthew.eagleton@noaa.gov> , <Don.P.Kuhle@poa02.usace.army.mil> , <Shannon.R.Hansen@poa02.usace.army.mil> CC: "Gene Pavia" <GPAVIA@jpo.doi.gov> , "Tony Braden" <TBRADEN@jpo.doi.gov>, <fen5 @pobox. alaska.net> John Amundsen with Forcenergy Inc. has requested apre-application meeting with agency representatives to discuss their plans for a proposed exploration project including drilling an onshore oil and gas exploration well in the West Forelands area of Southcentral Alaska. I have attached a word document that has a brief description of activities and a map for reference. What: Tom Cat Exploration Program, Forcenergy Inc. When: September 1, 1999, 10-12:00 noon Where: Talking Book Center Eugene (Gene) Pavia, Project Review Coordinator Division of Governmental Coordination, Office of the Governor Liaison to the Joint Pipeline Office 411 W. 4th Avenue, Suite 2C, Anch. AK 99501 Ph. 907-271-4317 Fax 907-272-0690 E-Mail: gpavia@jpo.doi.gov * The Sender's Mail Server is Running An Evaluation Copy of Guinevere. * Guinevere provides antivirus protection for Groupwise. * For more information and/or to download your own 30 day * evaluation copy, visit http•//www.indecon.com/guinevere ~~, Name: TOMCAT.DOC '~TOMCAT.DOC Type: Download File (application/msword)~i'~, u Encoding: base64 lofl 8/18/1999 1.35 PM 12/2/99 THU 09:29 FAX 907 258 8601 a FORCENERGY ALASKA PHILLIPS PHILLIPS PETROLEUM COMPANY ~ ~ HOUSTON, TEXAS 77251-1967 ~~: eOx 7967 NORTH AMERICA EXPLORATION ANp PRQDUCTION December 7, 1998 Alaska Department of Administration Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3120 Attn: Mr. Bob Crandall Re: USA-A-035017 West Forelands No. 1 Kenai Borough, Alaska Gentlemen: ~ 004 BELLAIRE, TEXAS 6330 WEST LOOP SOUTH PHILLIPS BUILDING ~k~ective December 1, 1998, Phillips Petroleum Company sold its interest in the subject lease and well to F'orcenergy Ir~c retaining only a 40% working interest in the deep rights underlying said lease. Enclosed herewith for your records are two originals of the N~~tice of Change of Ownership (Form 10-417) pursuant to 20 AAC 25.002. Copies o£ the Designation of Operator form in favor of Forcenergy Inc have been executed by Phillips and forwarded to I~ oreenergy for their handling. Please note your records accordingl9r. If you have any comments regarding this document, please don't hesitate to contaca the undersigned at 713-669-2942. R F ~~ I u E p Sincerely, ~~ w DEC 2 3 1999 Robert N. Welch Landmart Alaska Ui1 ~ uas cons. ComtDISSI0r1 Anchorage cc' Forcenergy tnc 3838 North Causeway Blvd., Suite 2300 Metairie, C,A 70002 Atm: M. !. Baiamonte • 12/23/99 THU 09:29 FAX 90r' 258 8601 FORCENERGY ALASKA I~j003 to/~z/ya xnu l~:aa rwx auaeana~oo A REGJ[]N OCT-22-1998 12=03 rvtcc:~n>;x~a m~nmi -•-•-• ni.e.unn ,~~~~ w~v..e 3 669 7004 P.007i007 ~ ~ Ci-5i2-C4 . T ! ~ ~ a~A; bh I I 1 1 Pa ~ 77B ~Saa C Y/ 'r 1 ' % ~ ! */' " S ~b ~~ ~ . ~ ~ ~ ~ ~~ WEST FORELAN©S ~ j` ' WELL NO. '! WELLBORE bL4GRAM (Ae of SJ9 3l64) ' 80" CGA 04' wyyQ1 sK, ,~ i" 5A~01t Gt31A tY4Y ~~IIi~t~ ,rdteon.,e. Spud Date; 1Q/Z7B1 Gtxnpletlon Dete: 3JZ9Jfi2 5urfeDe Location: Sec. 21,'fBN, R1bW a~r4"4alcw~ $aVyprd M®ridian 7700' wIt400 rl. Caok inlet 9a~in I 7370-7j~' Elsvetlon: 9p' KCi 7,~o-7M2' 76aa.7a~m `~ 006S~Iex20' tf P6t): 9475' pa,s-eat' oosaoaea' Z 3 ,.~ 1. Z 718" 6.5aK Tbp, (9373') 0338' MO 2, CAMCO D Nlpple w/vnlvs 0378.83At' Cemco A-2 alarm choke set to t~tooe ~ow.rTe.tie 80N.p36Y qt 18d0~t]o4 mcy ~asx' n+ro 3. Motle1 O peCKer get 9! 8272' t1504.96T~' PHTD 8476' ~ 0660.057D' 'OILS-0716' , 01~-7oQZ~' 160-10078' RECEIVED ' „6~.,~4II UEC 23 1999 „ors., toez ~„~„lit' Alaska Oil & Gas Coes. Commission '" ~" °~` Anchoragt3 ' "~"" ""`D0 TO ~ 3,500 '`-- oCT~Z2-1999 1129 90? ??6 6224 P.007 TOTAL P.007 12/23/99 THU 09c29 FAX 907 258 8601 FORCENERGY ALASKA f~005 ~I~Y~~ {' ~ '~, ~ fMRET 1'10- OF' - nro.vco Amoco Production Company ,1~~ • ~ ~aa~ _ FW . / ENGINEERING CHART r-www ~- sue~scr rlJ.c.~r D~4f/~i~a . /~~:/~ /~z. ~ o.Tr` /lJ--/3"~Z 1r ' f fJ ~.~ ~• i I ;~~ i ~ ~ i I i E t j~ I ' T ~ ' - i 1- • a _ ~- - ~ - ~ f I ' i i i 1 i~ l -1~~--3 y ~ -G/r: rT'---- ~! 7v~I mac., s~k,~! ~/0?~~ -- - ;1 ~ - _._~~.- „~,__._ ~.. _ .. w/~ =~ `~ l ~oa s~v~~` '~`~F'~=~~ i = ~~ ~ ; i ~- ~- '_~ `~'~~ ` :r ' ~ ~ ,;~P ~ DES ---r -- _~ z ~ l ~~~ ~J ~R ~(a ~,, ' '~ ~! _. '~ =~~ ~ :- ~-,a~ ;Icd~d7! - f ' i I ~I 1 ~ ': ,~~i, I ` 1'0l o " T ~ ..~.~ ~ I1 ~i9~BPjr~ ~~ y fyl~° R~V'~S' ~ Y -T j ~_ _ ~,-~ i ~ ~ ~ I i L___~ i ~ ~ ! ! I 1 I f--- j~ I ~~ M l tpJ v -~°~' ~.i __ ...., - i ~ i ~ fi ~ - i -, ' au ~ ~~ ~ - ~~1 . ~.r a. S ~ jl \ M113+ i ~ ' 1 i ' 1 i ; ~ ~ i ~ ; ~j i- `~'" CUT. Q~F ~' ,G'SC~ .''r/.E'f- f f~ ,!~ 1 ~At Ar. iW ~FC~ivF~ DEC 23 1999 Alaska Qil ~ Gas Cons. Comm~e~1-~ Anc"or~gP . ; ~ - aba~ Forcerlergy Inc • December 15, 1999 Alaska Oil and Gas Conservation Commission Blair Wondzell 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Application for Sundry Approvals (10-403) for West Forelands #1 Tie-in Dear Mr. Wondzell, We have constructed atie-in between the West Forelands #1 well and our existing West McArthur River Unit facility. The gas will be used to fuel our West McArthur River facility and potentially our share of the Trading Bay facility. The only well work that we will be performing is to use wireline to pull a Camco A-2 velocity choke that is set at 9,234' MD / TVD in the 2 7/8" production tubing. If there are any questions, please contact. me at 258-8600. ~ l ,. Paul White Drilling Manager Forcenergy Inc. 12/15/99 rs F:\Drilling\West Forelands #1\403 Cover.doc HEADQUARTERS REGIONAL OFFICE Forcenergy Center TELEPHONE TELEPHONE 2730 SW 3rd Avenue 305/856-8500 310 K Street 907/258-8600 Suite 800 FAX Suite 700 FAX Miami, Florida 33129-2237 305/856-4300 Anchorage, Alaska 99501 907/258-8601 STATE OF ALASKA ALASKA O~AND GAS CONSERVATION ,~MMISSION APPLICATION FOR SUNDRY APPROVALS ~ "b', 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: X Alter casing: Repair well: Plugging: Time extension:_ Stimulate: Change approved program: Pull tubing: Variance: Perforate: Other: 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Forcenergy Inc. Development: X 90' KB feet 3. Address Exploratory: 7. Unit or Property name 310 K Street, Suite 700 Stratigraphic: West Foreland Well #1 Anchorage, Alaska 99501 Service: 4. Location of well at surface 8. Well number 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. ~ #1 At top of productive interval 9. Permit number 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. 61-49 At effective depth 10. API number 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. 50- 133-10028 At total depth 11. Field/Pool 880' FSL, 671' FEL, Section 21, T8N, R14W, S.M. West Foreland 12. Present well condition summary Total depth: measured 13,500 feet Plugs (measured) RECEIVE D true vertical 13,500 feet Effective depth: measured 9,475 feet Junk (measured) DEC 16 true vertical 9,475 feet ~~~~ Casing Length Size Cemented Measured depth ~rtica ep Structural Conductor 84' 20" N/A 84' 84' Surface 1,945' 13 3/8" 1500 sx 1,945' 1,945' Intermediate 7,360' 9 5/8" 1400 sx 7,360' 7,360' Production ~~• `OOS)< 113tii~` h34\~ ~ " (la Liner Perforation depth: MD and TVD (11,122'-11,134' sq) (11,074'-11,082' sq) (11,044'-11,056' sq) (10,952'-10,976' sq) (10,194'-10,224' sq) (9,504'-9,524' sq) (9,688'-9,710' sq) (9,550'-9,570' sq) (8,918'-8,920' sq) (8,505'-8,526' sq) (7,666'-7,688' sq) (7,440'-7,442' sq) (7,370'-7,390' sq) (9,042'-9,062' sq) (9,336'-9,341' w/ 2 spf, 9,341'-9,352' w/ 4 spf) -Open Tubing (size, grade, and measured depth) 2 7/8" 6.5 # @ 9,273' MD / TVD G ~ ~ ~ 1 1 ! i \ ! Packers and SSSV (type and measured depth) Model D Packer on Tubing @ 9,272' MD / TVD 13. Attachements Description summary of proposal: X Detailed operations program: _ BOP sketch: 14. Estimated date for commencing operation 15. Status of well classification as: 3i-Jan-OU 16. If proposal well verbally approved: Oil: _ Gas: _ Suspended: X Name of approver Date approved Service: 17. I hereby 'fy that the foregoing is true and correct to the best of my knowledge. Signed: Paul White Title: Drilling Manager Date: FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Approval N~ ~ ~ ~ ~~~ Plug integrity BOP Test Location clearance r. Mechanical Integrity Test Subsequent form required 10- y~~ This well may not be open to`test or regular production until the operator complies with the requirements of 20 AAC 25.055. ORIGINAL SIGNED BY Robert N. Christenson TT Date ~`1 i C i - oner omm ss U Approved by order of the Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE • • Forcenergy Inc August 4, 1999 C~!-airy lC~M~3 ~ 0, Alaska Oil and Gas Conservation Commission ~ ~~~ ~~~ David Johnston ~'R'`~ --=.~ S~ ~~~G 3001 Porcupine Drive ~~~~ Anchorage, Alaska 99501 ~°~ ~~~ ~EO~ ~S: Re: Well Work and Production Start-up on West Forelands #1 SgA~ r Dear Commissioner Johnston, We recently purchased the West Forelands #1 well from Phillips Petroleum. ~e currently building a road and pipeline to the well to tie it in with our West McArthur River facility and bring it on gas production. The gas will be used to fuel our West McArthur River facility and our share of the Trading Bay facility. The only well work that we will be performing is to use wireline to pull a Camco A-2 velocity choke that is set at 9,234' MD / TVD in the 2 7/8" production tubing. If there are any questions, please contact me at 258-8600. . to . ~ ~_ ~F 1 White ~i~~l1o~ ~. Drilling Manager Forcenergy Inc. HEADQUARTERS REGIONAL OFFICE Forcenergy Center TELEPHONE TELEPHONE 2730 SW 3rd Avenue 305/856-8500 310 K Street 907/258-8600 Suite 800 FAX Suite 700 FAX Miami, Florida 33129-2237 305/856-4300 Anchorage, Alaska 99501 907/258-8601 Pte. ~~~ '~~ (~~ C ~~ t ~`~~ o- i9~S ~T~ ~~/b .~ ~ Ib , ~~1,1Mctr s--~---- C~~ pl. 3~~i ~ 6z. ~3~D ~i~f7~~ ~ al2,o,l g y Gk PM-'4 ~, ~l8 ~ 3sa psi . 13S ~, _ ~o P~' . S ~`' ~~ ~' 5~~ 6~ ~, 133/ 2 S~ `' f f3`l ~~. l3~ ?3~e ~~~~ 8 w ~~ t t k SSSV s~S 3 ~Q 9Z~3 ~'33~-~~z D~s _,,~, ~ ~ _ ~ ~f ~ 5' , ~~~ ~ S ~~ af/ Sv _ ~ ~a S N f~ ~'~ . l ti~Z2-3ho~~~ S°'t~- Cam... ~ ~ SSS / ®~ z ~3 ~ ~ 1 ~~ ~O~ ~® L. A. Darsow District Superintendent March 28, 1984 File: WGS-009-WF Mr. C. V. Chatterton, Chairman Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Subsequent Report of Flow-test West Foreland Well No. 1 Kenai Borough, Alaska Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 Attached in triplicate is State of Alaska Form 10-403, Sundry Notices and Reports on Wells, for the subject well. West Foreland No. 1 was flow-tested over the period February 22, 1984 - March 20, 1984. Information gathered during .the .test is currently being analyzed to determine the extent of the reservoir. A Camco 2~" A-2 sub-surface safety valve was set and the well was shut in. If there are any further questions, please contact Kip C. Clapper at (907) 345-3994. Very truly yours, i~v • ~ ~~~ w.d~/ W. G. Smith ,~~ ~~. District Manager `'~ Attachment cc: J. C. Burnside - Denver RECEtV~D APR ~- 2 Alaska 0~ ~ GGO~~! KCC/dmh ' STATE OF ALASKA ~ ALASK IL AND GAS CONSk=RVATkON triMkSSkCJN SUNt?RY NOTICES /~~D REPQR~`S t~N ~iIELLS ~~ ~~~ t. DRILLING WELL ^ COMPLETED WELL'! OTHER ^ 2: Name of Operator 7. Permit Na. Amoco Production Company 3. Address 8. API .Number P. 0. Box 100779., Anchorage, Alaska 99510 50- 133-10028 4. Location of Welt 9. Unit or Lease Name West Foreland t0. Welt Number 879.5' FSL, 670.5' FEL, Sec. 21, T8N, 1 R14W, $. M. tt. Fietd and Pool l d N 1 F .an o • Ore West 5. Elevation in feet (indicate KB, DF, etc.1 6. Lease Designation and Serial luo. 78' MSL A- t2 Check Appropriate Box To Indicate Nature of Notiee, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT Of: (Submit in Triplicate) !Submit in Duplicate) Perforate ^ Alter Casing ^ Perforations ^ Altering Easing Stimulate ^ Abandon ^ - Stimulation ^ Abandonment ^ Repair Well. ^ Change Plans ^ Repairs Made ^ Other ~ TeStl ng Pull Tubing ^ Other ^ Pulling Tubing ^ ENote: Report multiple completions on Form 10-407 with a submitted Form 10-407 far each completion.) t3. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.tt35-170). Approximately 52.8 MMscf were flowed during the period 2/22/84 - 3/20/84 from West Foreland No. 1. Several problems due to hydrate formation were . encountered during the initial portion of the test. When these problems were ~ resolved, 7.7 MMscf per day were flowed through a 22/64 choke at 2,675 psi. i After the flow test was completed., a Lynes pressure bomb was run in the hole. ~ The static pressure was. 4,164 psi at 9,336'. At the conclusion of the test, a CAMCO 22" sub-surface safety valve was set at 9,253' and the well was returned to a shut-in status. I E1VED REC f ~~, cans. Comn-is~1M I ~ Alaska a< ` 1Q. l hereby certify that the foregoing is true and correct to the best of my knowledge. ~¢ ~/. !1 y,~~. Title Oate _,_,.-- Signed 4 yy ,,++ p The space below for Commission use'~~~~ „3L.- r ~ `" ~,.~ Conditions of Approval, if any: . s- i i I BY Order of COMMtSStONER me Comm~ssign Date ~._._-- _..-- _ Approved by i~ Form lU-4U3 .,..., ..... ................. ......~..--~- Rev. 7-4 $0 and "Subse4uent Reports" in Duplicate r ~~ ~O~ _~~ L. A. barsow District Superintendent ~~ ~' ~ Amoco Production Company Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 November 15, 1983 File: LAD-1092-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Request for Approval to Flow-test West Foreland Well No. 1 Kenai Borough, Alaska Attached in triplicate is Form 10-403, Sundry Notices and Reports on Wells, for approval to flare gas during an extended flow test on the subject well. Amoco Production Company requires this extended test in order to quantitatively determine the reservoir size and reserves. The well will be flared at a rate of 7 MMCFD (million cubic feet per day) for seven days, or a total of approximately 50 MMCF of gas. A temporary line and meter run will be laid out to a vertical flare approximately 200 yards from the wellhead in a westerly direction. This will place the flare stack in an unobstructed and safe area. Amoco expects to begin. this work towards the end of November. Your prompt reply will be appreciated. If you have any questions regarding this work, please contact Kevin Smith in our Anchorage office. Yours very truly, L. A. Darsow District Superintendent Attachments a ±, ~" t° ~r~~~~ ~_ t ~t_~~ ~, rS~~~7~vi' tll L ~: ',liyl a t.~f: lSy ~~~F~~} ''~~'~it11tlC~~r KLS:seh STATE OF ALASKA AND GAS CONSERVATION MISSION '~ ALASKA:L i. DRILLING WELL ^ COMPLETED WELL C~ OTHER ^ ~ 1 2. Name of Operator 7. Permit No. Amoco Production Company - 3. Address 8. APL Number P. 0. Box 100779, Anchorage, Alaska 99510 - so- 133-10028 4. Location of Well - 9. Unit or Lease Name 670,5' FEL, Section 21, T8N, R14W, S`.M. 879.5' FSL West foreland _ . , . - 10. Welt Number . _ 1 11. Field and Pool West-Forel-and Well No. 1 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. t2. - .Check Appropriate Box To Indicate Nature of Notice, Report, or Cther.Data NOTICE OF INTENTION TO: - SUBSEQUENT REPORT OF:- , (Submit iii Triplicate) - - - iSu6mit in Duplicate) _ Perforate - ^ Alter Casing, ^ Perforations ^ Altering Casing ^ Stimulate ^ Afaandon ^ Stimulation ^ Abandonment Repair Well `~ Change Plans ^ Repairs Made ^ Other ^. Pui1 Tubing ^ Other ~ Pulling Tubing ^ iNote: Report mull+ple completions on-Form 10407 with a submitted form 10-407 Lor each completions 13. Describe Proposed or Completed Operations dClearly state old pertinent details and give pertinent dates, including estimated date of siarting any proposed work, for.Abandonment see. 20 AAC 25.105-1701.. Estimated starting di~te: late November T983. 1. Obtain a static bottom hole pressure. 2. Flow well.. at 7 MMCFD fior seven days, monitoring constantly. 3. Shut-in well and wireline in. bombs. Flow well for three hours at 7 MMCFD and shut-in for 14-day buildup. 4. Retrieve bombs and. return well to shut-in status.'. ~ I NOTE:: Wireline work will be ..performed utilizing a 5,000.psi lubricator:. _ ~~_ _ ac. t ~Z':~rk I'^.ri~"~ qty ~~3 i~at~d./ , ~ No ~` ~, - . ~ , - ~ ~ or+ Foam _ y ; s ~ _ _ , :, :~,lu 14. !hereby certify that the foregoing is true and correct to the best of my knowledge. District Su erntendent f~ Signed ~ n ~ ~r l`~- Title p Date ~ The space below for Commission use Conditions of Approval, if anyiTOtlfy Co>7IInission. one day before staxt of 7 .day test.. i approved Copy Returned URIC ~I~L SiciiED - ~:~~ ~~~ By Order of ~~ ~ f ' ~j3 BY LONIIIE C. SMtt~ '~` v _ 9 _ Approved by COMMISSIONER the Comm~ss~on Date ¢__. _ _ /~ /~'1 form 1003 'uvey,i, ~rrte.,iw~.: ~,~N,.t.m.~ Rev- 7-1$0 and "Subsequenr Reports" +~ Duplicate '~ Tor ~ _'- Amoco Production Company ~ ~ Post Office Box 100779 Anchorage, Alaska 99510 907-272-8471 L. A. Darsow s'_ District Superintendent /~K~ vN June 10, 1983 File: LAD-622-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska. 99501 Dear Sir: Subsequent Report West Foreland Well No. 1 Kenai Borough, Alaska Attached in duplicate is a State of Alaska Form 10-403, Sundry Notices and Reports on Wells for the subject well. The wireline pressure survey was performed May 16-19, 1983. Also attached, are the work summaries performed on October 20, 1982, and May 16-19, 1983, and a copy of the pressure survey results. In our October 15, 1982 letter, you were informed of our plans to pull the subsurface safety valve (SSSV) and run a pressure survey. Two attempts to pull the SSSV were unsuccessful and Amoco elected to run the pressure survey to the top of the SSSV, which is located at 9234 feet. We felt that continual attempts to pull the SSSV may have resulted in wireline tools or wireline being left in the well. The Minerals Management Service was informed of the revised test procedure and approved it. No flow testing or flaring occurred. The annulus was vented to atmosphere on two occasions for a short period of time in order to reduce the pressures and detect any changes in annulus pressures. Results .from the pressure survey indicate that the subsurface safety valve is open and in communication with the reservoir. Pressures recorded were approximately the same as original bottomhole pressure of 4250 psi. Pressures recorded on the 7-inch casing/tubing annulus indicate good casing integrity and isolation from the reservoir. ~~ AMasKa 0i~ & gas Cons. i:ommissiot~ Anctr~ra~e • C. V. Chatterton File: LAD-622-WF June 10, 1983 Page 2 t No additional testing of this well is planned. Amoco intends to maintain the well in a shut-in status until it becomes economically feasible to place the well on production. If you have any questions regarding this matter, please contact our Anchorage office. Yours very truly, ~~ L. A. Darsow District Superintendent Attachments KEO/seh ~- . - fq :,. ~ .. .F: ?`~ `~;, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL ^ COMPLETED WELL ® OTHER ^ 2. Name of Operator 7. Permit No. Amoco Production Company 3. Address 8. API Number P. 0. Box 100779, Anchorage, AK 99510 50- 133-10028 4. Location of Well 9. Unit or Lease Name West Foreland 879.5' fSL, 670.5' FEL, Section 21, T8N, R14W, S.M. 10.WeIINumber 1 11. Field and Pool 1 land Well No t F r W 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. . o e es 78' MSL A-035017 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ^ Alter Casing ^ Perforations ^ Altering Casing ^ Stimulate ^ Abandon ^ Stimulation ^ Abandonment ^ Repair Well ^ Change Plans ^ Repairs Made ^ Other ~ Pull Tubing ^ Other ^ Pulling Tubing ^ (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-1701. Please refer to Attachments 1 and 2, which describe work performed on the subject we 11 on October 20, 1982 and May 16-19, 1983. Results of the pressure survey, as run to the top of the SSSV located at 9234 feet, are included as Attachment 3. ~ d~~: ~r~ i6 S~ '`` ~ r j s ~~~ ,s ~<~ ~~ TD i36~ a `aq~~~.ci ~ ~ ~ ~ ti+ w ~ 3 ~ !~'~fS~ ~~' te'e'-~ ~4~75~ ~z73- Z~~ ~~~iz G _2v~3 ~ p }{ - ~~ ~~ /~~~ ~ --i~~/Zl~~~~4~y~/F 4~~r~4 ~ ' ,l11as ~ b~iG'as Consa o Iss~orp ~ ~ ~ ~ ~ , ~ " __ " _`3 i0ri?~E ~~ l ~ 1 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~,,,_/~ ~ ,. ~ j~ ,•.. ~ Signed 1~1. ~ [A Title District Supers ntehdent~`'`~'' Date V C V c+ -" The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date_________.__.___ ~z L Form 10-403 Submit "Intentions" in Triplicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate ~ A ATTACHMENT 1 Summary of Work Performed Amoco - West Foreland Well No. 1 October 20, 1982 On October Z0, 1982, A. V. Gravely and K. E. O'Connell (both Amoco personnel) visited the West Foreland Well No. 1 wellsite to determine. the existing wellhead pressures.. Two contract Roustabouts also went and cleared small trees and brush around the wellhead area. - The chain on the wellhead gate valves was removed and the valves were greased and operated. The old tubing string gauge was replaced with a - new gauge. After opening the master valves, a tubing string pressure of 3450 psi was recorded. Pressures of 3450-3550 psi were recorded when the well was shut-in on March 29, 1962, just prior to running the "A-2" subsurface safety_ valve (SSSV). The 7-inch casing annulus gauge was replaced and a pressure of 2250 psi was recorded when the valves were opened. Some 3/8-inch stainless steel tubing was rigged up to vent above the wellhead shelter. The annulus was vented to atmosphere for 30 minutes and the pressure was reduced to 2000 psi. The 9-5/8 inch x 7-inch casing annulus was then checked and the pressure measured 700 psi. This was vented upward for 30 minutes and reduced to 350 psi. The 13-3/8" x 9-5/8" casing annulus was checked for pressure. This annulus had 300 psi and was bled down for 30 minutes. The pressure was then measured at 10 psi. All gauges were removed and replaced with bull plugs. The valves were closed and the chain reinstalled. _ a @~ ~ s 4 a~~ ~..~ ~ z a ~ . Y. Alas ~',' ~ ~~as Cons. ~crmm~ssior ~nchcrage r ~ ATTACHMENT 2 Summary of Work Performed Amoco - West Foreland Well No. 1 May 16-19, 1983 Monday, May 16,.1983: Transported wireline unit and materials to West Foreland well location with helicopter. Required 4 trips which included 3 sling loads for Otis Equipment.. Rigged up 5000 psi. lubricator and pressure tested to 2000 psi. Recorded tubing pressure of 3450 psi and _ 7-inch casing annulus pressure of 2000 psi. NOTE: These are the same pressures that were on the well when checked October 20, 1982. - Tuesday, May 17, 1983: Ran in hole with 1-11/16 inch sinker. bar to the top of subsurface safety valve, tagged at 9234 feet. - Attempt to run_in hole with 2.25 inch .gage ring; stopped at 6 feet-. - Run in hole with 2.00 inch gage ring; went past tight spot and to 80 feet with no problems. - - Run in hole with 2.25 inch impression block for impression at 6 feet. Block had edges curled. Called helicopter and sent Otis man to Kenai to get a tubing swedge. Checked annulus pressures: 13-3/8 inch annulus - 250 psi. 9-5/8 inch annulus - 750 psi, vented upward and bled to 90 psi in 90 minutes. 7-inch annulus - 2000 psi, vented upward and bled to 1000 psi in 135 minutes. - Run in hole with 2.30 inch swedge, worked through tight spots (6 to 20 feet), ran to 9234 feet with no problems. Wednesday, May 18, 1.983: - Run in hole with equalizer prong to 9234 feet. Set for 30 minutes. Well appears to be equalized across the SSSV. - Run in hole with pulling tool and prong to latch on SSSV.. Could not latch on. Sheared tool and bent prong. - Run in hole with impression block to 9234 .feet. Good impression of fishing neck looking up. - Run in hole with new prong and pulling tool. Tried for 90 minutes, could not latch. on. Thursday, May 19, 1983: Run in hole with dual pressure recorders equipped with 12-hour clocks. Run in to top of SSSV at 9234 feet. Set for 120 minutes. Pull out of hole with pressure recorders and stop at 1000-foot intervals for 10 minutes in order to obtain pressure gradient (copy of results attached). i; s ~ ~, -~ ~v~ ~~~v r'~13SCu ~~; ; iiaS Lur15. vUmmIS510R ;nc"1r~~e • ATTACHMENT 2 (Continued) Rig down lubricator and .clean up location. Final pressures recorded on well as follows: 13-3/8 inch annulus - 250 psi 9-5/8 inch annulus - 600 psi 7 inch annulus - 1000 psi 2-7/8 inch tubing - 3450 psi f ;~ 3` ~ 8 ; s- ~LyA • ..1~~ ~ 1 `i~ a Jv Alas;cu Gil ~ vas Cu,~s. Cvmmissiar v~Cii~~aGB t {,; ~JI DO•TTCr... i'1.Ul.E PRCSSURC REPORT. COMPANY ~~' ~ OPCCttATOR MSOY ~ DATE + PAGE OF • /' ~' OEC•ti5')•C AInO~.'U. .. 1i ~ We.11s I ~ 1 ~Y L'LL LEASE FtELO . COUNTY/PARISH STATE - DATUM REF. ELL''V_. ~w'est Forland No 1 , ~ . - . FT. ~,. _ 1H10IIAlEU INTERNAL 111'1 MAX TEMP MIN. TOO. IV. PACIIEN DEPTH ENO OP TOG ~.~ GAUGE CALIORA TION TEC HNIOUE ~ • ~F IN3. • FT. ~• /T, ^LE AST SODA RCS GJMOOV LVS CURVE ^OTNCR UPPER GAUGE ~ HESS CLE. NO. PH 1~+5. CLE. HANGC INNE11 HOUSING NO. CHANT TIME HANGS CALt01~AT10H DATE CALIRR ATION MODULUS CALIONATION 7 •P f DC PTH S[T °~ 45392 0-7100 PS, 2 HRS. 02-14-83 K, 3662.707. 10.63 FT. o .° ' LOWER GAUGE •R LS S..EL C. NO. PRESS. ELE. RANGE INNER NO USING NO. CHART TIME RANGE CALION ATION OATS CALIOR ATION MODUWI CALIOKATION a•Pf D[/TH f[T 45391 0-7100 PSI ~ HRS.. 02-14-83 K. 3687.791 17.948 -*• ~~~~ DOTTOM HOLE PRESSURES ~h UPPER GAUGC LOWER GAUGE SURFACE CONDIT10N5 OAy TIME OCFLEC710N PP ES^+URE DCilECT10N NON•LINCAR• COIiR ECTiON•CL OOTTOM-NOL[ PRESSURE TIME DEFLECTION PRESSU RP, DEFLECTION T NON•LtN EARi CORRECTION, CL ~ OOTTOM.HOLE PRCSSURE W ELIHEAD PRESSURE WH TEMP. CHOHC slzE ~ ,~ REMARKS T.n~L :t HR. f LOCK IINCNES) T IINCHCSI MODU LVS ** PaKY~a 1Pf•CL ItNCHES) '~ {' (1NGHES) ~~ MOON LVS +~ PeKY .i.f Pf iCL ~OWT PSIG 0P SaTH .INCH t vrface .9435 + 8 3474 5 - + Z 9234 1.158 + ,, 0 3 8000 1.133 +10 4170 1.1285' 0 4179 4 ~ 7000 1.112 +11 4094 .1075 0 I• • `~ S 6000 .0915 +11 4017 • c .. 5000 .069 +10 3936 1.064 + 2 3944. • ~ 4000 .0465 + 9 3853 1.042 + 3 3864 ~ I~ ' 1 '~ ~ 3000 .023 + 8 3764 1.01.9 + 3781 _ , I ' ~-•, _ ' 2000 .9995 + 7 3.679 0.996.• + 3697 - to z ~ 1000 0.975 + 7 58 27Q 3514 Surfac . 0.9495 + G 3494 0.945 +11 IZ 17 O1S$IUIIUtt'~ ~,~~q~,S~r ~. :, ~. ~ 15 ~ ) r ~._ = ~+ a ~ ':, a ' . ~A ~i~ Amoco Production Company (USA) Post Office Box 779 Anchorage, Alaska 99510 907-272-8471 L. A. Darsow District Superintendent March 11, 1983 File: LAD-274-WF Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska' .99501 Dear Sir: Subsequent Reports, Sundry Notices and Reports on Wells (Form - 10-403) GP 18742 Well Nos. 10, 11, 19, and 25, MGS 17595 Well Nos. 4 and 15, and ,;,.W~sir = Fot~ ., i~l:~ <~o. 1' This letter is in response to your letter of February 16, 1983 on the above subject. Attached in duplicate are the Subsequent Reports outlining the work completed on Granite Point 18742 We11 Nos. 11, 19,. and 25. Also attached in duplicate are the Subsequent Reports on Middle Ground Shoal 17595 Well Nos. 4 and 15 indicating that the work on these wells was canceled. Concerning the other two wells in quest ion, our records show that a Subsequent Report was submitted for Granite Point 18742 Well No. 10 on January 14, 1983. A copy of that letter-and duplicate copies of the Form 10-403 are attached. Thew'~t~k>-on tie Wiest Fgre~l~rt~ 6d~11 3r # ~zt't~f~"`fir We will notify you upon completion of this work. We apologize for"the delay in submitting these reports and we will make every effort to avoid this situation in the future. Yours very truly, L. A. Darsow District Superintendent Attachments RLW/seh Alaska Oif ~~ Ar s C~~9~Cumatission Amaco Production Company. P.O. Rox 779 . Anchorage, Alaska~995f0 Res Subsequent Reports, Sundry Notices and Reports on ~~ells (Form IQ-403} For the following lists of "Notice of Intention Tos" Sundry hotiees and Report on de lls (form 1.0-40 3) this office does. not have on .record .the "Subs equent Report o f : " defining the action taken on the appr oved intention, P1Qa$e advise thus office by Subs~uent Rep ort of `the disposition of tha intention. ~?eI ~ Ar._^oco Date Rrief Acscri tion of intention , ~4GS ~,5 1/2/80 Perforate "G" zone. beral©ck GP 19 6/10/80 ~teperforate t~D Kenai C-4 MGS 4 3/3/ 82 Pull .tubing., replace packer GP I1 418/82 Pulp tubing, reperforate, sQt Kobe GP 25 6/8182 Puil tubing, clean out., run Kob e 'ts~ ~r~l~nd'~' ~ 10 /1.5I 82 Periodic testing shut in gag well GP 10 IO/26/82 Pull. tubing, repair leaks Sincerely, ~/ + %~~ ,. F _,' „ -, {~ Sraith '~Lonni Q C Commissioner LC S /3 EST/g lh +~-, ; - V `` ~_.. Foraf approved. (, . ~ ~ BudSet Bureau No. 92-R356.6. UNITED STATES r..AHOoFFI~eAnchorage____________ DEPARTMENT OF 7HE INTERIOR LEASE NumeeR _A-_93 ~_Q1_?____________ GEOLOGICAL SURVEY uNIT___~I_~~t._Fo~_~l.a`t~d_____-____ t LESSEE'S 1VIONTHLY REPORT: OF OPERATIONS .. ~ R 'State Alaska-------------------- County --Kenai---------------------- Field -----West_Foreland------------------------ ~ F The following is a correct report of operations and .production (including drallang and producing wells) for the month of -------August---------------------- 19.69-~ --------------------------------------:- ----------------------------------- , .1 ent's address ________P,__O,__Box ?79_ _ _ Pan,-American. Petroleum Corp ---------------------- Company tt - ----------- ' - - - ----------- Anchorage, Alaska 99501 i Y ` ~ ---------------------=------------------ ------------ ------ -------------------------------- Signed __--'>_%r~__~~~z~~------------------ , Phone_______________________272-8471 ',Asst. Area Admin, Su ervisor s - - -------------------------------------------------- .agent s title~----------------------------------------------p------ SEC. AND OF ~ TWF. RANGE WELL NO. Dwrs Paonveen BARRELS OF AIL QRAYITY CII. FT. OF C7A9 (III thousands) GALLONS OF (}ASOLINE RECOVERED BARRELS OF WATER (If IIOIIe, SO St8tC) REMARKS (If drilling, depth; if shut down, cause: date and result of teat for gasoline confent of gas) SE/4 ( . SE/4 ~ ~ Sec. / ~,/ , i 2 i 8N 14~ 1 0 0 0 0 0 None i ^ . ,-- ~ ~ n ~d~~ p1Y151 N OF 01 D G/t5 CH GE NOTE: -There were _________ 11O_____..__________________ runs or sales of oil; __________,______??~ ______-____:____________ M cu. ft. of gas sold; __________ 11O______________________________ runs or sales of gasoline duri.*)g the month. (~ti'rite "no" where applicable.) NOTE.-Report on this form is required for each calendar month, regardless of the status of operations, and mint be filed in z duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-329 - (18IIU8[y 1950) - U.S. GOVERNMENT PRINTING OFFICE:1964-0-72~78d UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form aPProved. Budget Bureau No. 42-R3b6.6. Anchorage LAND OFFICE --___--_`------__-_'-_°'--_-'- LEASE NUMBER____A-035017____________ uNlr____West_Foreland________ ___ LESSEE'S MONTHLY REPORT OF OPERATIONS Alaska Kenai West Foreland State ---------------------------------- County ------------------------------------ Field ----------------------------------------------------- ------------ The following is a correct report of operations and production (including drilling and producing rvellsJ for the month of --------------- July_-----------------, 19.69-, --------------------------------------------------------------------------- /Igent's address ______P.__0.__Box_779___________________________________ Company_Pan A erican Petroleum Corp. ---------- - --------------------------- ----Anchorage, _ Alaska 99501-------------- Signed ----- --~---- G~-~~2~------- ----------------------- pyzone______________________272-8471________________-___________________________- .Igent's title___sst,__Area_Admin.__Super_yisor BEG. AND _ ~ OF 'rWP. RANOE WELL NO. Dsxa P¢ODOCDD $ARREL9 OF OIL _ __ I QRAYITY CU. FT. OF QA9 (IR t110llSJIId3 ) QALLON9 OF C7ABOLINE RECOVERED $ARREL9 OF WATRR (If IIOIIO, SO State) REMARKS (I[ drilling, depth; if ahDt dORD, aquae; alato and result of teat for ¢aeoltne content of ¢as) ;E /4 .E/4 / ~ec.21 8N 14W 1 0 0 0 0 0 None HL13 ..... 1RM __~-k-~ QKG 1()--~.- _. ~;1.~J --- ~.-.. v -__ J ~,. , ~ ,` ~ • , 1 , i Yy' /~ I ~ ~• ~ I/ ' NOTE.-There were __________n~ _______________________ runs or sales of oil; ______________n~____________________________ M cu. ft. of gas sold; no runs or sales of gasoline during the month. (Write "no" where applicable.) NorE.-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-828 (January 1960) IB-2F7GG-9 U. 5. GOVERNMENT PRINTING OFFICE Foi. ~.,9-,i30 (Re:. 5-i:3) ~ ~; ; _ -~ SUS:•iI: IN DUPL2 ~ ::,I.J .GJ i ~. i i_5 ~ Form annroved. Budset Bureau No. 42-R355.6. ~ (S~ .e: it _ ~ p f~ i ~rR. f~ i l~+' ~ •- _ u _ T '~ _: ' i ~ ~ (f'f ~• f i'v T';f~ i ~ R st: °. ins ~n reverses ~e) $. LEASE DESK\ATYON AND SERIAL x0. GLC ~:CG.:AL SURVEY ~~ ~` ~ 5~~ ( 7 ~~V~f•~ ~.t.liVS~~ ~~~'•J v t,/•i't /~, r.~~~ _ _ 11~~~Vl~.~~~i)ibJiV i`s'S ~t`a~ J'it`Y~ ~.©V G. IF INDIAN, ALLOTTEE OR:TRIBE NA~fE ia. TYPE OF 1~V ELL: ou, tI'ELL ^ 'Gas _ IC ELL ~ DHY ^ Other 7, ii NIT ACREEDYENT TAItE -~ b. TYPE OF C03IPLETION: - - ~ NF,W ~. WORK DEEP- ^ EN ^ 'F ^ PLIIG RIFF. BACK ^ BESVR. ^ Other $, FARaY OR LEASE NASIE .E OI \~I;LL West Foreland ~- SAME OF OPERATOR . 9, WELL NO: -.. Pan American Petroleum Cor poration 1 3. ADDRESS Oa OPEBATOB _ _ _. _ ._..._ _ .._ ` - 10. FLELD AND POOL, -O$ WILDCAT P. 0. Box 779< Anchoraa Alaska 4. LOCAT+o. o~ ~~:::.L iP. e7orl took- >:; erez I,/ ••cu: Sn RLCOY(LG71Ce milli ORJ Slate reracir >>i ^;: l,t)"' R14W T8N 21 ti f EL Se ' f • Wildest. K ANP SIIAVEY N of SL, i. at snrfacYS 879.5 , , on , c , W ~~ 670.5 11. SEC-, T.; R., u., OH BLOC Seward Meridian Sec P AREA ~ R14W °t'ion 21, T8N , At top prod. interval reported below Seward Meridian . Same - ~ ~ Cook-Inlet Basin Same _" _ " 14. PEB~IIT NO -• ~ DATE ISSUED ~ ~` 12 -COUNTY OH -. - - PARISH 13. STATE Alaska ZS, DATE SPUDDED 16. DATE T.D. REACHED 17. DATE CODIPL. (Ready t0 pYOd.) ls. ELEVATIONS (DF, HI{B, 8T, GH, ETC.)' 18• ELEV. CASNOYiEAD 10-27-61 I 2-1-62 I 3-29-62 I :90' '~ - 20. TOTAL DEPTH, STD & TVD 21. PLIIG. BACK T.D., D6D & TPD- 22. YF PYCLTIPLE CODiPL.~ HOW >iANY'~ 23.~INTERVALS DRILLED BY .ROTARY TOOLS ~ CABLE TOOLS 13,500 MD & TVD I ' 9475 I ': _ I _,_,,* ~ 0-13500 ,. ~ _0 125. ' WAS.DIBECTYONAL 24. PBODGCINO INTERVAL(S), un' rocs wuira.r.aa~..-. ~~~ ---- . - - SuRVl:s aasub 9336-9352 Perf. interval (MD) - NO Lower Tertiary -' 26: TYPE ELECTRIC AND OTHER LOGS BDN 2T.-.WAS WELL CORED IES, Micro-log, caliper, GR, Sonic, Neutron, Dipmeter; Cement Bond Log I Yes 23- CASING RECORD (Report all. strings set iri well) '~ '. CASING SIZE WEIGHT, ~LB./FT.- DEPTH SET (IdD) HOLE SIZE ~ ~ I i, CEDIENTING BECOBD " ASfOIINT PIILLED 20,1' 841 24"` ' 267 sx. 13 3/8" 54.5~~ 1945' 17 .1/2S1 1500 sx. None 9 'S/8" 40.0., .7360' - 12~ 1/4" _ 1400 sx. 7" ': 26.0~~.: 11341,1. 8 1 2" 1500 sx. ._. 29, .. ~ LIDTER RECORD - 30. TUBING RECORD SIZE ~ 'TOP (bYD) ~~ 80TT03f (MD) BACKS CESIENT~ -SCBEEN (ISD) :` SIZE DEPTH. SET ~(aID) ~ PACSEH SET."'(SID) .. 9 7/S" 9973- 9779 -~on~-- . E TI Bsco ( ai nu ) 32, ACID, SHOT, FRACTURE, CEMENT SQUEEZE,. ETC. ~1 ~ ;~°~- ~~+ s q~ '~f'~ , 0~~+-`~`$ , ~°~'-, 044= 5 6 s q'. 952-7b sq) (10194-224 sq); (9504-24 sq) (9b88-971®~~ INTEHVAL:(idD) A.YOI?NT AND HIND P DIATEBIAL IISE31 , 50-70 sq) -(8918-20''sq) ' (8505-26' sq)' (7666-88 sq - ~4 perforated ones -were sQU.eezed° +0-42 sq) (7370-90 sq) (9042-62 sq) ' None:. ~ y~,/50 to ~ ~0 ~x ~ each-a1 ~ GaLeeze 36-41 to/2 jPf, .9341-52 w/4 jP fl-Only perfs ope>~ -jnhs w re t+-ACaure tected_ 33.• PRODUCTION _ - I WELL STATIIS (Produciriy OT DATE ~SI1tST PHODIICTION PHODOCTION IdETHOD (.Flawing, Dae isJt, pssmp~g-sriee and: type of pump) n=om _ _ eh 'ri) SI _.I _ _.._ _.._ -- _ -. .._ , DATE ~OF TEST ' HODHS TESTED• "- CHOifH $IZE PBOD N ~ FOB - O[L-RItL. • GAS-DtCF. ~ WATER-aBL. - GAS-0IL BATIO: TEST PBBIOD ~ ~ - 3-17-63 I' 18 hr: I '. Var I` --~ ~ ;None ( 8,200 ~ None N A ~ lLOW., TUBDTO PR^s93. ' 'CASING PHESSIJRE CALCULATED OIL-BBL. ~ ~ ~ - GAS-Id CF. ~ WATER BBL OIL GRAVITY-API (CORR.) I 124-HOaH BATE I I I a ( ~ ' 34. DISPOSITION OF-GAS .(Sold,_uasd fOY'Jxei, vented, BtC. )._ __ .._ - _. _ TEST WITh ESSED BY ' ;;Vented ~ (Coastal Dr1g. Co. Personnel. 35. LIST OF ATTACHAfENT3 ._ . Well History 36. I.hereby certifg ~~r~~~r~Yattached information is complete sad correct 'as determined from all available records A' ~ ~~ TITLE District Superintendent ~' DATE Mav T3 sGNED *(See instructions and Spaces Eor Additional Data on Reverse Std¢) ~ - /~ INST_fdUCTI©RIS General:'=This forlq is designed for submitting a coulplete and correct well completion report and log on all types of lands and leases to either a federal a ~enc o or: both, pursuant to api~licable. Federal and/or State laws and regulations: Any necessary special instructions concern;zur the use of this form and the cumber o State agency, submitted, particularly with regard to local, aria, or regional procedures and Practices, eithez are shown below or will bo is.nled by, or may be obtained iron f copies to be and%or State office. • See instructions on items 23 and `L4, and 33, below regarding separate reports for separate co;nPletiutls. r, the local L edcral If not filed prior to the time this summary record is submitted, copies of all currently available logs (drillers, geolohzst sample and core analysis, ali types electric etc. fo' tion and pressure tests, and directional surveys, should be attached hereto, to the extent required by applicable federal and/nr Stat:c laws and regulations. All attachments sliould be listed on .this form, see item 35. ), zma- Item R: If there are no applicable State reguuements, locations on Federal or Indian land should be described fu accordance with federal requirezncats. Consult local State or; Federal office for specific iustrttetions. Item 1B: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given fn'other spaces on this form and izi any attachments. items 22 and 24 If this well is completed for separate production from more than oue interval zone (multiple completion), so state in item 22, and in item 24 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 33. Submit a separate report for each additional interval to be separately produced, showing the additional data Pertinent to such interval. (page) ou this forul, adequately identified, Item 29: Sacks Ceme~~t": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ..Item 33: Submit a separate completion report on this form for eACh interval to be separately produced. (See instruction for items 22 and 24 above.) •i .. . ._. _.. .- 37 SUH111IAItY OF POROUS ZONES : ~ . SIfOYY' A,.I. I6IPORTANT ZONES Ob POROSITY AND CONTENTS TnERE06 ~ CORED ~ IN'PERVALS ~ AND ALL DBILL-STEbr TESTS, .INCLUDING $$, - . :_. DF,I•TH INTERVAL TESTED, CUSFIION USED, TIME TOOL OPEN, FLOR'INO AND SFIUT-IN FRESSU1tES, AND RECOVSUIES GEOLOGIC AfAItIiERS ..... ~ FORDIATION TOP .' BOTTOM ~ . . DESCRIPTION, CONTENTB~ ETC. - ;Pre .Tertiary ~. - _ _ ~ ~ NAME TOP '.' 'Core No , l l l j 827 11 , 847 e(,` • C 1 . .I bIEAS. DEPTF3 TRUE VE1tT DT YTli J hark gray, hard, dense and siliceou Tertiary Surf. --- 4 -13,469.ec. 3! con 1. dk. Core No. 7 13,46 g green congl., subang., Pre-Tertiary 11,495 ' `' light basic igneous': rocks,. volcanic rock & ~ - _ hale. , - ~~~ ~l~~dxxla~a~>~ ~~ IlXxx~xx~xl~l~y: DST ~~1 9504 9524' a~5250 MCFD in 20 hr. BHSIP = 4300 psi ~' _L. Tertiary t ~~2 & 3 .9688; 9710, •ec, salty water. :: _ ~~4 9550 9570 , ec . salty water `t~ " ;! l ; #S & 6 ~ 8505' 8526 e'c`. Salty water .' ,! ~~ ,I ; ~~7 ,8, 9.,10 7666 7688 ec ., salty. water . -: ' ._ .__. .-: . . - „ „ ,.; ~~11, & 12 - 7370 7390 o.~ecovery „ . ..., ' ~ft3 9042 9062 ec, salty water ~- „ „ >`~14 9336 _ 9352 a.'8,200 MCF in 18 hr. BHSIP:- ,I II . Perf ~~1 11122 11134 1d..26 BSWPH - 4475 psi` u n .- ~~2 ~ 11044 11082 ld. 90' BSWPH , ,. - , #3 10952 10976 wb, salt water t~ i•~4.. 10194, 10224. ld. 2 BSWPH ~ ,r „ ;.; :~ ,., - - ; •. ._ • ,. _,: ,.,,, .: , .. . . ;.. .-: .- .. •' ., i ~ U.S..GOYERNME{iT PRINTING OFFICE;~19fi3-PE63836 - - - c -,~.~' WELL COH1P'ar,~N OR RECOMPLETION REPORT a>~ WELL LOG DESIGNATE TYPE OF COMPLETION: New Work- Plug Same Different (~ ~ ^ ^ ^ ^ ^ ^ ^ Gas Dry ! 1 Reservoir Oil Back Reservoir Well Over Deepen DESCRIPTION OF WELL A\TD LEASE Operator Address Pan ~mercan Yetroleuln Corporation P, 0, Box 712 Anchorages Alaska Lease Name Well Number Field & Reservoir West Foreland I No„ 1 ~ I ?^?ildcat Location - Sec.-TWP-Range or Block & Survey . . _ _ .___ 879,5' iv. of S. Line, 670.5' W. of r;, line, Sec. 21, T8N, R14Wy (SP~1) County Permit number Date Issued Previous permit number Date Issued Conk Inlet Basin ` 49-61 I 10/4/61 I ~o~t- ~,.~,,,,,~ Date spudded Date total depth reached Date completed, ready to Elevation Elevation of casing 10/27/61 I 2/8/62 I produce 3/29/62 I (DF, RK$~~or Grieet I hd. sange 72~rj feet Total depth P.B.T.D. Single, dual or triple completion? If this is a dual or triple completion, ~ I furnish separate report for each com- ~ ~ 500 9475 Single pletion. , Producing interval (s) for this completion I Rotary tools used (interval) Cable tools used (interval) 9336 9352 f 0 - 13,500 None Was this well directionally drilled. ' Was directional survey made. Was copy oP directional survey Date &led I N A. sled? N.A; N. A, Type of electrical or other logs run (check togs filed with the commission) Date filed C 'ssion Other 1o s run -Sonic ~icrolo Li met ~r 4/4/62 CASING RECORD Gamrla :Iz2iy Casing (report all strings net in well-conductor, surface, intermediate, producing, etc.) . Purpose ;e drilled SizQ,llo S,tgbt~asing net Weight (lb./ft.) Depth set c67 cement Sa Amt. pulled Conductor ~ I LL Ebb LL Zi4 2 " 13 3/8" 54 1~2 1945 1500 ~ 2 ~4" 9 5/8" 40 7360 1400 production 8 `" 7" 26 11341 1500 __ TUBING RECORD 7.~ rF'~~ Size Depth net Packer set at Size. Top Bottom Sacks cement I Screen (ft.) 2 ?/8 in• I 9`L72 ft• I 927`L ft. 7 in. rt. 1 9272 ft. PERFORATION RECORD ACID, SHOT, FRACTURE, CEMENT SQUEEZE RECORD Number per it. Sine 6c type Depth Interval Am't. & kind of material used Depth Interval f 2 3 5 8 Ca 9336 - 9341 4 3 5 8 Ca 9341 - 9352 INITIAL PRODUCTION Date of first production Producing method (indicate if flowing, gas lift or pumping-if pumping, show size 8c type of pump:) Not placed on Froducti ~n Date of teat Hrs. tested Choke size Oil Prod. during test Gas prod. during test Water prod. during test I Oil gravity bbls. I MCF I bbls. ~ ° API (Corr) Tubing gresaure Casing pressure Cal'ted rate of Pro- Oil Gas Water (Gas-oil ratio duction Her 24 hrs. bbls. ~ MCF bbls. Disposition of gas (state whether vented, used for fuel or sold): j CERTIFICATE: I, the undersigned, state that I am th~rf'a ~ 01'Am2.Ibf the~att t3mPri ran l~r?trn"1 cum corporation (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of my knowledge. Signature C° ~. ~CTOH .~ ;;~ 1. ~'~ ~ 3~.• getroieur 3rarch Division of Minas and h•';inerais Alas&a t)apt. of i~iatvra P.ssource:i Alaska Oil and Gas Conservation Commission Well Completion or Recompletion Report and Well Log Form No. P-7 Authorized by Order No. 1 Effective October 1, 1958 i ~ fETAIL OF FORNfATIO1~TS PENETRAT F Formation Top Bottom Description* See attached dri lers log an well histo < < t ~ a ~ ~ . ~ _ i ~ ~ _. ~ ~ ~ ~ ~ ~ ~ . * Show all important zones of porosity, detail of all cores, and all drill stem tests, including depth interval tested, cushion used, time tool open, flowing and shut-in pressures, and recoveries. INSTRUCTIONS: Attach drillers log or other acceptable log of well. This Well Completion or Recompietion report and well log shall be filed with the Alaska Oil and Gas Conservation Commission not later than sixty (60) days after project completion. _ . . CONFIDENTIAL 10/24/61 k,U. 10/2:i/ti1 Ft, 1', 10/`16/61 it.i?, llrld, 1S6' water well 1U; 27/61 Nast raised 9:UU ,a,M. >et pipe rack and hang !,ine Spooler and. hel)<y hose, Spudded 11:00 P, hl. TU lh', .19,05' ground to RDH, Zfi" Smith 4 cone bit 10/28/61 Drld, to 67' . Shut down ri~_ 8:30 .t.M. , l,ow on t';,el due to holes in barge, lost approx, '14,000 gal, fue , 10/29/61 Shut down - Hooking up water and steam lines T. U, 67' 10/30/61 Started up rip, prime pumps and mixing mud, run bit to bottom and circ, L-rld, to 1'U 84' , trip 10/.il/61 Set 84'-20" conductor pipe w/110 sx, cmt, 1'll ~' 11/1/61 W.U.G. TD 84' 11/2/01 llrlg. Flit No, 2, 124', Tll 1544' 11/3/61 llrlg, to 'fh 1945' , Fait ~}3, 124" , xan Schlumberger log, ~'~rld, to 1149 w/17~" Bit, 'fU 1945' 11/4 /Eil llrld, to 1945' w/17~" I;it, KI7 to run csg, itan 1.945' , 13 3/8", 54, 5R' J-55 LT&C csg, w/1500 sx, cmt, Circ., `fll 1.945' 11/5/61 Gmtd, csg. W,U,G, TU 1945'. 11/6/61 w.U,G. Tll 1945' 11/7/61 llrlg. w/124" Bit ~4, lll 2x34' 11/8/61 Urld, to 3354' w/Flit ,g4, frip, llrlg, to 9064' w%124" hit ~5, frip. Prld. to 4432' w/1.2~" Bit ~0, '1'U 443`1' 11/9/61 Drl~-, to 4563' w/Bit ~j6. 'frip. !-rld, to 49'74' w; Bit ;~7, i!rld. to 5300' w/t;it i~8. 1'1~ 5300' , 11/10/61 llrld, to 5356' w/bit ~8. L~rld, to 5675' w/bit ~f9, l~rl!1, to 5tf94' w/bit i~10 124" Bit Tll 5ny4', 11/11/61 llrld, to 63L4' w/bit }~10, 11 s 12, fll 6324' 11/12/61 iiorlcing tight hole and circ, C~ 5610' , xeam w/bit X13 ;~.1ti9' - 5y14' Urld, to Tll, 6b18'. 11/13/61 llrld, w/bits ld and 14 to fll 6815'. !teamed from 6250' - 6310', 6443' - 6504' , Ei54U' - 6678' . t • 11/14/61 Lrld. to TD ?1L6' w/hits 15 and 16, 1'la' hole. reamed from 6645' - 6ti15' . TD 71'L6' 11/15/61 Drld. to 7367', Bit X16 and 17. Reamed 7Ub7' - 7U9U'. Tll 6367' 11/16/61 Ilan ~chlumberger ~,-Log, Gamma kay, Sonic, Micro-t,aliper, (,ont.inuous dipaeter, 1'D 767' 11/17/61- Ran Schlumberger ~ pull out. Prep. to run csg, kan y 5/8" csg. Dropped string .1224' to top of fish. 127 y' between 13 5/8" csg and 9 5/8" csg. TD 7367'. 11/18/61 Fishing w/Howco R'fTS tool (used as a spear). Set packer .and circ. thru fish. Fish stuck. ~irc, thru fish w/175,000 strain. j'otal pull, 245,000#. Unable to pull free. TD 7367'. 11/19/61 Fishing TD 7367' 11/20/61 Fishing TD ?36?' 11/'ll/61 Fishing TD 736?' 11/l2/61 Fishing TD 7367' 11/l3/61 1~'ishing TD 7367' 11/24/61 Fishing PD 7367' ll~l5/61 Fishing Tll 7367' 11/`l6/61 I~'ishing complete. Gsg. rec. Run ~ cmt. csg. TD 7367. 11/l7/61 kan 207 jts. 9 5/8", 43* 8 RD, csg. set ~ 7360' lcB. kan 3 gist centralizers, float collar and shoe. Collar set at 729?' w/1400 sx cat. Gsg. patch ~ 325'. Drld. out cat. 6960! - 6429'. TD 736?'. Bit #18, 8~". 11/28/61 llrld. to 7612' w/8~' Bit #18. TD 7612' 11/29/61 Drld, to 7977' w/bit #19 and 20. Reaw from 71342' - 7903' 11/30/61 Rear 7903' - 7977' w/bit #'l 1. llrld. to 8345', Lit #L2 and 23 12/1/61 Drld. w/bit #24. keam from 8431' - 859U'. TD 8798' 12/2/61 Reaa from 8710' - 8740'. Bit ~ 25 and 26. Drlg. TD 9182' 1l/3/61 llrld. to 9190'. Ream from 9135' - 919U'. hit X27 plugged due to poor filter cake. `PU 9435'. korking pipe to unplug bit f- 12/4/61 Bit ~'L8 drld, to 9635'. Ream 9299' - 9435'. Drld. w/bit ~Z9 TD 9?86' . 12/5/61 Dr lg. bit #30 to 9794' . Ream 9656' - 9794' . Bit plugged. klash pipe. Ream 9530' - 9686' , 9716' 0 9736' , 9864' - 9874' . Urlg. TD 9897'. 12/6/61 Ream 9107' - 9145' , 9790' - 9897' . Drld. w/bit #31. Ream 9702' - 9811'. Drlg. w/bit #32. TD 10,153'. 12/7/61 Ream 9978' - 10153'. Bit X33 drlg. Ream 10,158' - 10,188' Ur1g. w/bit #33. TD 10,284'. 12/8/61 Recta 9613'- 9633'. Rit X34 drld. to 10,359', Run-in bit #35, Reacts 9579' - 10,359' . Drlg. to 10,39'1' `P D. 12/9/61 Drld. to 10,460' w/bit #35. Ream 9595' - 9797', 9970' - 10,03'L' 10,L75' - 1U,41y' , 10,419' - 10,460' w/bit X36. llrlg. Tll 10,467' 1l/10/61 React 10,212 - 10,460' w/bit #37. Drld, to 10,511' . Reared 10,094' - 10,186', 10,344' - 10,5'11'. Drlg, w/ 8~" Bit #38. Tll 10,588'. 12/11/61 Rean 10,490' - 10,588', bit X39. llrld. to 10,630'. ~irc. to log. Run Schlumberger logs. I.t..S. Log fron 7660' - 10,530' 100' fill and tight hole on bottom. keam 10,545' - 10,630', bit #40, Drlg. 'tD 10,704' . 12/12/61 L1rlg. to 10,706' w/bit #40. Ream 10,662' - 10,706' x/bit X41, drld. to 10,801'. Spot ream from 10,725' - 10,801' w/bit ,~42. Drlg. ahead. TD 10,871'. 12/13/61 L>rld. to 10,932' w/bit #42. Ream 10,8'15' - 10,932' w/bit #43, drld. to 10,985' . Spot ream fror 10,835' - 10,875' w/bit X44 trouble breaking. Reaffi 10,915' - 10,985', drlg. TD 11,008'. 12/14/61 Drld, to 11,0'15', cleaned hole for Schluaberger. Run I.L.S. Log frog 10,530' - 10,966' . Run Kicro-(;a-liper fros 10,530 - 10,966' . Reacted 10,975' - 11,0L5' , Uirc. and cond. gaud for ~-logs. TD 11,025' . 12/15/61 Run Schluaberger Atteepted to take w/bit X45. L-rlg. 12/16/61 Drld. to 11,114'. drld, to 11,189'. Drlg. TD 11,243'. sonic and Game-a Flay logs from ?360' - 10,978' 30 side wall cores. Reamed 10,985' - 11,025' TD 11,102' . Ream x/bit x{46 , 10 , 814' - 10, 9'14' , 11, 084' - 11,114' , Run in with bit #47, tight spots 10,820' - 10,860'. 1'1/17/61 Drld. to 11,261'. ~irc, for logs, kig up and ran Schlumberger I.F;.S. Log 10,.9?8' - 11,2'12' . Ream 11,L'll' - 11,261' w/bit X48. Drlg. TD 11,321'. I i 12/18/61 Drld. to 11,351'. Spot rear 11,305' - 11,351' w/bit x.49, drld. to 11,405'. kunning in hole w/bit #50. TD 11,405'. • • 12/19/61 Ream 11,375' - 11,405' w/bit ,~50. Drld. to 11,522'. Ream 11,461' - 11,522' w/bit ,~51. Drlg. TD 11,539' . 12/20/61 Drld. to 11,5?8'. Run in bit X52, spot ream 11,533' - 11,580' Drlg. TD 11,61?'. 12/21/61 Drld. to 11,615'. kun in bit ff53 w/ 9/16" jets; spot ream 11,570 ' - 11,625'. Drld. to 11,656'. Pull X53. Magnai'1ux D.Ca. I'D 11,656' . 12/22/61 kun in bit ~p54, re am 11,606' - 11,6'26' , 11,626' - 11,656' , drld. to 11, 679' . React 11,606' - 11,679' w/bit X55, llrlg. 'PD 11,685' . 12/2d/61 Drld. to 11,707', pulled bit, gun bit X56, ream 11,652' - 11,707'. Drlg. TD 11,733'. 12/24/61 Drld. to 11,739'. Pulled bit. Run bit X57, spot ream 11,660' - 11,739 '. Drld. to 11,772' . Pulling bit. TD 11,772'. 12/'15/61 Run bi t $58, ream 11,722' - 11,772'. llrld, to 11,804'. Pulling bit. TD 11,804'. 12/26/61 Run bit ,~59. Ream 11,749' - 11,804'. Drld, to 11,8'17'. Pull bit. Run diamond core Bbl. 5 3/4" X 3 1/2" X 56.84 bbl. - 6 1/8" dia. bit. TD 11,82?'. 12/27/61 Coring 11,827' - 11,847'. (;ore ~1. Run bit *60. Ream 11,811' - 11,82?', drlg. 6 1/8" to 8 1/2". TD 11,847'. 12/28/61 Drld. to 11,882, pulled bit. Run in x'61, ream 11,853' - ll,ts8l' . Dr lg. TD 11,888'. 12/29/61 llrld. to 11,939', i~/6U RPN and 30,000 wt. Pulled bit, running in X62. TD 11,939' . 12/30/61 Ream 11,908' - 11,939'. Drld, to 11,997'. Pulling bit. TD 11, 997' . 12/30/61 Ran in X63, ream 11,970' - 11,997', drld. to 12,0'16'. Pulled bit. Ran in X64, ream 11,096' - 12,026'. Drlg. TD 1'L ,041'. 1/1/62 Drld. to 1'1,081', pulled bit. Ran in #65. Drlg. TD 12,098'. 1/2/62 Drld. to 12,136', pulled bit. RU to run logs. TD 12,136. 1/3/62 Run Logs to 12,136' . Run in bit ,~66, cleaned out 11,121' - 12,13ti' . Drlg. TD 12,174' 1/4%6'1 Drld. to 1'1,186' , pulled bit, ran in X67, ream 1'1,156' - 12,186' , Drlg. TD 12,216'. _ -_..~ ., f '1317 - ® _.,~ ... r. 1/5/62 1/6/62 1/7/62 1/8/6'1 1/9/6l 1/10/62 Urld. to 12,236' , pulled bit, ran in x{68, teased 11,128' - 1'1,236' . 6 hra. to change bit. Url. to 12,174'. Pulling bit. TD 12,274'. Ran bit ,~69, spot reacted 1'1,214' - 12,'174' , drld. to 11,333' . Pulling bit. TD 12,333'. Ran bit ,~70. Drld. to 12,383' . purvey 11,935' - 4°, 12,375' - 2°, Pulling bit. TD 12,.183' . Ran bit x'71. Drld. to 1'1,444'. Pulling bit. Tll 11,444'. Ran in bit ,~'T2. Drld. to 11,500' . Pulling bit. T~ 12,500' . Rag in bit ~'T3. llrld. to 11,533'. Pulled bit. kenning bit x'74. TD 12,533' 1/11/62 Reared 12,250' - 12,533', drld. to 1'1,584'. Pulling bit. TD 12 ,584' . 1/12/62 Yan in bit x'75, teased 12,560' - 1'1,584' , drl d. to 12,636' . Pulling bit. TD 12,636'. Dev. 2° 0 12,375'. 1/13/6l Ran bit ,x'76, teased 1,616' - 12,636' , drld. to 12,669' . Pulling bit. TD 12, 669'. 1/14/62 Ran bit x'77, teased 1'1,642' - 12,669' , drld. to 1'1,703' . Pullinr bit. TD 1'1, 703' 1/15/62 Ran bit #?8, teased 11,672' - 11,70.s', drld. to 12,734'. Trip, ~ ran bit x'79, teased 12,705' - 1'1,734' . Drlg. TD 12,742' 1/16/62 llrld. to 12, 765', pulled $it, ran X80, teased 12,735' - 12,765'. Drlg. TD 12, 782' . Dev. 2 ®12,375' . 1/17/62 Drld. to 12, 825', pulled bit, ran X81, drlg. TD 12,829'. 1/18/62 Drld. to 1'1, 885' . Survey de v, 2° 12,875' , pu lling bit, TD 12,885' 1/19/62 Ran bit #~82 , real 12 , 855' - 1'l , 885' . Drlg. TD 12 ,94'1' 1/20/62 Drld. to 12,947, pulled bit, ran #'83, react 12,917 - 12,94 T', Drlg. TD 12,983. 1/21/62 Drld. to 13,003' , Pulled bit, ran x'84. Reared 12,980' - 13,003' llrlg. TD 13,030' . 1/22/62 Drld. to 13,06?' , pulled bit, ran X85. Reared 13,047' - 13,Oti7' Drlg. TD 13,07?' 7 hours/trip. 1/23/62 Drld. to 13,126'. Dev. 6° 12,865'. Pulling bit. Tll 13,126'. 1/24/62 Ran bit X86, reamed 13,102' - 13,126'. Drlg. TD 13,194'. 1/25/62 Urld. to 13,196', Survey, llev. 140, pulled bit, ran X87. Ream 13,163' - 13,196' , drilled to 13,235' . Survey, Dev. 143 Pulling bit. 'Pll 13,'135' . 1/26/62 Ran bit X88, recta 13,160' - 13,18?' , 13,1kS7' - 13,L.tS' , llrld, to 13,275' . Survey Dev. 15~°. Pulling bit. TD 13,275' . 1/2?/62 Pulling X88, Rec. 21 roller bearings K/junk sub, run X89, recta 13,250' - 13,'175' . Drld, to 13,313' . Pulling bit TLS 13,313' . 1/28/62 Rua X90, reamed 13,291' - 13,313' . Drlg. Tll 13,371' . 139/62 Drld. to 13,373', pulled bit. Ran X91, reamed 13,350' - 13,373', Drl~. TD 13,405'. 130/62 Drld. to 13,419' , pulled bit, ran ~r92. llrlg. TD 13,401' 1 131/62 Drld. to 13,464', survey Dsv. 13 3/4° • 13,454'. Pulled bit, tact dia. core bbl. Cored 13,464' - 13,469' . Core ,~2. 'PD 13,469' . 2/162 pna is bit t93, opened hole 6 1/8 to 8 1/2, 13,464' - 13,469' , drld. to 13,500'. Circ. sad coad. for h-log • 13,500'. RII for Schlvaberger TD 13,500' . 2/2/62 pun logs. Ran IES liicro-Log Caliper, Sonic, Garmsa Ray Continuous llip aster. pan aicro caliper 13,500' - 7,360'. All other logs run Eras 13,500' - 12,136' , punning in bit ,~93. Tll 1,500' . 2/3/6'1 Circ. and cond. and for csg. Lay down 4 1/'L" llP and 6 1/2" llC. RU to tact 7" csg. TD 13,500'. 2/4/6'1 Run 11,341' ?" csg. K/600 sx. cement. Plug down 7:00 P.K. ~~ NOC TD 13,500'. Float collar ~ 11,'191'. 2/5/62 KOC and picking up 3 1/'L" DP TD 13,500'. 2/6/62 Picking up 3 1/2" DP, Pressure Test ®1,500 PSI for 15 min. Held OK. Circ. • 11,289'. NO Schluaberger TD 13,500, PBD 11,289'. Bit #'94, 5 7/8" peed YSR 2/7/62 id0 Schluaberger, pulled bit. NO Schluab~~rger TD 13,500' PB 11,289'. 2/8/6'1 KO Schluaberger TD 13,500'. PB 11,289'. 2/9/62 Ran Gaaaa Ap and Neutron Logs. 11,302' - 7,363'. Ran Cmt. Bond. Log 11,303' - 8,862'. Top cat. ®9,165'. Running in w/2 jts. 2 7/8" tubing packer - x over sub - 3 1/2 llP. Perf 11,122'- 11,134' aicrolog. TD 13,500' , PB 11,289' . , •'''~ • 2/10/6'1 hell flowing, IFR, 30 BPH, FFR, 26 BPH, ?2 BN rec. 23 pps chlorites. SIP 60 psi. 2/11/62 Set ret. 11,059'. Squeeze by 50 ax, Squeezed to 6,000 psi. Ro break. 2/12/62 Pulled pkr., ran rot. to 11,033'. Sgzd. x 25 sx. Perf, sicrolog frog 10,952' - 10,976' X 2 SPF. 2/13/62 Ran pkr. to 10,938, Swab. Rec. 29 BN, 10 pps Chloriclea, 2/14/82 Sgad. sicrolog Int. 10,952' - 10,y76' X 25 sx. Mass U Cmt. FR X water 3 BPN X 3,000 psi. Cst. ® perf, aqueesed ® rate of ~ BPM X 3400 psi, final pressure. 1JM tool valve shut good on bleed off. Backwashed 1 1/2 bbl. cn~t. 2/15,/x2 Perf. sicrolog int. 10,194 - 10,224', Run and set RTTS tool 10,166'. Swab fray 2,844'. Rec. 68 bbl. Swabbing. 2/16/62 Swabbing 2,844' - 3055'. well flow approx. 2 BPH. Swabbiss. 2/17/62 Kill well X 7'1 bbls. 11.2 mud down DP, Reset RTTS Packer 10,074'. 2/18/s2 idell Shut in. SIP steady 0 1,825 psi, Bled off well head. Pulled ~t1'TS pkr. well flow at low of 200 psi. Circ. and cond. and to 13,500'. Cstd. ~` 2/19/62 DST ~1. ~ y ~ 2/20/62 Pert. 9y504' - 9,514'. PSF 9,470'. ISI 30 min. 1500' water cushion. Upen on 16/64" ch. in tool, 16/64" on surf. Good blow iawediate~, Strong blox in 5 sin. water cosh. to surf. in 15 sin. water Cush. re c, in 45 min. except for fine spray w/1,000 psi ahead of ch. 2/'11/62 Testing. Prep to log. '1/2'1/62 Yon -logs. Testing ,~.~ '1/23/62 Misrun on DST ~2, ~ 2/24/62 DST ~3 ~ 2/25/61 Ran Schlusberger - rerf 9,550' - y,570'. llST ~4. 2/26/62 Ret ~3 0 10,908'.- Set HOWCO Ret ~4 c4 9,475'. Sgzd. X 100 sx, microlog int , 9,504 - 9, 524' , 9, 550' - 9, 570' , 9, et~8' - 9,710' . Ret. ,~5 ® 8890 X 550 sx. 2/27/62 RU Schluaberger, Yon CBL Log, 8,890' - 7,400'. 2/28/62 Ran Schluaberger CBL Log, 8,890' - 7,400', Perf sicrolog int. 8,505 - 8,526' 2 SPF, Run in 1,488' water, PSA 8,442'. ~~JJ ~J • 5 3/1/62 DST ~5. Misrun, ~b 3/2/62 ll5T #6. 3/3/6'2 Set Ret ~1 8,458' . Perf microlog int. 7,666' - 7,6118' X '2 SPF'. ~~ DST fir. 3/4/61 Ran in a 5 7/8" bit and csg, scraper. dean to 7,716'. Press. to 1,500 PSI, No communication. DST #8. 3/5/62 Rif to Swab. Swab. PSI' ~f10. 3/6/66 Testing. Ret. 7f7 set ~ 7,64 s', sgzd. w/lU0 sx, cmt. 3/7/62 Logging. Micro, int. 7,37U' - 7,39U', PS.~ 7,2111'. Swab. 3/8/62 Swab. DST Swab Test fFll. 3/9/62 Swab Test rtl'l. 3/lU/6L Set Ret. ~- 7,33U' . 3/11/6'2 Drl. out ret. @ 7,330', f)rl. amt. to 7,374'. Rep. swivel. 3/12/61 Rep, swivel, Drl, to 7,390' . Press test perf. 7,370' - 7,390' . U.n. ~rl. out ret @ 7,424' to 7,444'. Press, test perf. 7,44U' - 7,442', UK. llrl, out ret. @ 7,643' and drl, cmt. to 7,688'. 3/13/6L Press, test perf. 7,666' - 7,6t~8' X '2,000 psi. 3/14/61 Drl. out ret. @ 8,481' and drl, cmt. to 8,526' Press test 8,504' - 8,5'26' Uh. 3/15/6'2 Drl, out ret, ~ 8,890' and drl, cmt. to 8,92U'. Press, test int. 8,918' - 8,910' UK, Perf, microlog int. 9,042' - 9,Oti'L' \ 2 at'F. ~~ 3/16/ti2 J5T ;=13 `y~ 3/17/62 DST X14 3/18/6'2 Set ret. @ 9,198'. 3/19/6`2 Set ret. @ 8,981'. Sqz, int. 9,U4U' - 9,060' X 100 sx. j'ress test microlog int. 8,918' - r~,920' , S,SU5' - 8,5'16' , 7,666' - 7,688' , 7,440' - 7,442' and 7,370' - 7,39U' , OK. 3/2U/62 981' to drl, exit, from 8,983 - y,Ob2', CD to Drl. out ret. '@ 8 , 9,198. Press test int. 9,U42' - 9,U6'2', UK, (,hanged over to mud. itit, 9.7, Yisc. 37. 11r1, out ret, @ 9,198' . t,D to 9,475' . Lay down 3 1~2 1)P 3/21/2 Ran 'l 7/8" tbR. to 9,306. i,anded pkr. •~ 9,250' . Caaco "D" nirPle ;w 9, 258' . • • 3/2l/62 Swabbing 3/23/62 Kill well X aud. Pull pkr. loose. 3/24/62 Leak in tbg. ~ 1,550'. Sst pkr. ~ 9,273'. Ran tbg. Stuck tbg, blanking plug. ~---~ 3/25/62 Fishing tbg. 3/26/62 l.ould not recover tbg. blanking plug, llisplaced X water X 1 bbl, diesel fuel in tbg. X annulus. Nippled up well head. Flow to pifi to clean up. 3/27/61 Circ. 3/28/62 Run tbg. 319/62 Shut well in 8:L0 .t.K. TD 13,500' , PBll 9,475' , PSA 9,272, Rig released 4:00 P.M. RD 3/30/62 RD Std. by 3/31/62 RD Std. by F(~nFM 321 2- 57 ~ ,, ' •~' I'A AMER l CAN ' P`ETR~LEUM CORPORA i CAN P. 0. Box 712, Anchorage, Alaska F 1 L E S U B J E C T f2 E T U R N T O Mr. D. D. Briice~ t/hlPf,~ PAtm1P?Tm R~'~5~1. M_r. R. W. Craig division of Mimes and Minerals ~ P. 0. Box 712 Ancllorag_e, Alaska ~ Atrhnra_g~ Alaska DEAR SIR: We care transmitting herewith Well Completion Report and We11 Log (Wellsite Sample Description) for the Pan American West Foreland ATo. 1, See. 21, T 8 N, _,, ~'..R, ~ W, S.M., Alaska. psis material is being provided with the understanding that the information will be kept confide-sn,tial by the State as provided in Section 2008.1 of the Oil and Gas Conservation Regiz],ations, unless approval for release i5 obtained in writing from Pan American Petroleum Corl~orata.on. Please acknowledge receipt. f G'~~ .. ~~7'rrp ,,,,, i ,,,, ~ 7YlYAi~I.i{; SIGNED 1JiL1(•i.LS • ORIGINAL - RETAIN BY ADDRESSEE. DUPLICATE - RETURN TO SENDER. TRIPLICATE - RETAIN BY SENDER. 7 6 62 DATE DEAR SIR: -~RECEIVED~ J~~ 1962 'v Petroleum Branch Division of Mines and Minerals Alaska Dept. of Natural Resaurces I SIGNED- DATE ..' ,, WELL HISTORY WEST FORELAND N0. 1 October, 1961 Building road on location, moving in rotary tool and equipment. Spudded 11:0'0 P.M., October 27, 1961. Set 20" casing at 84' with 276 sacks cement November, 1961 Drilling. Set 13.3/8" casing at 1,945' with 1500 sacks. December,,„_19b1 Drilling 12,013'., Logged hole to 10,978'. Cored 11,827-11,847. Set 9 5/8" casing at 7,360' with 1400 sacks. 'January, 1962 Drilling 13,4b9. Logged .hole to 12,115'. Took 13 sidewall cores 11,050 to 11,412. Gored 13,4b4 to 13,469, February; 1962 ' Drilling at 13;500'. Set 7" casing at 11,341' with 1500 sacks. Perforating Form. s-aao ~01~ FI C~~IV~'I~~:_ ~d, ureau No. 42-R3b6.4. pnt sl eapires 12-31-60. . .{~ixi:harage U. S. LAND OFFICE --------------------------- SERIAL NUMBER __ ~~ ~~17________ LEASE OR PERMIT TO PROSPECT _________ UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY L®G ®I~ ®IL ®R GAS WELL LOCATE WELL CORRECTLY upera tear Com an Pan ;~nlez~icdn `c:trol.eum l.orPorat•ianAddress __l~'.._~'_ Low 7.12, ~#Ixe:l;orl~ge, ~-laska P Y ---------------- - - - -- ---- ----------- - -- ------------------------------------------------- Lessor or Tract ----------------------------------------- -------- Field ----F=_~lrlt:at----------- State __t1.3ak~------------- ~st r'orelalld - VPell No. _____1___-- Sec. _ ~l_ T. ~=`_'_-- R.1_=``__ Meridian ___'_~" ~------------------- County _ ur?pk 1 nl~sic I~xsin - - ---- Location ~?~~,_~ ft. ~N' } of __ 5 _ Line and ~ ~4?•~t. {~' } of r, Line of ___ `'`` c ~__`'~ ~()~ riH Elevation ' (Darriok Hoor rdative fo sea level) The information given herewith is a complete and correct record of the well and all work done thereon so far as can be determined from all available records. Signed ------------------------------------------------------------------------ Date___---Juno lvt__1J6~------------------- Title----_:1rta 1•arel~xan The summary on this page is for the condition of the well at above date. Commenced drilling ____~f~fG7_____________________ 19-_f'1 Finished drilling ___''__1_~y__________________________, 19__x'2 ae Heaving plug ~ Material ----- ---------------- Length --------------------------- Depth set --------------------------- - - ~ I ~_i~ ~i t'~/valve : , ~'1 l a ~ ________ '~ _ 1 ~ ________________`a I~ ~)~ ________ _ S1Z f SHOOTING RECORD Size - hell used Ex osive u~ Qua nt(t ~ Dato Depth shot Depth cleaned out ---------------- ---- ---------------- ----- ~ ------------ +--------------- - ---------- r------------------- r------------------- -------- -------- } --------- ~--------- ------------ ------------ ------°----- ------------------------ ---------------------------------------- ~ TOO USED Rotary tools ~ ere used from _____ ~~?-_______ feet to __ !__~ ~ ~~?~~ _ feet, and from _______________ feet to ______.____ feet Cable tools wer e used from ________~ ____________ feet to __ ____________ feet, and from _______________ feet to ___________ feet I~ TES -------------------i ---------------------- `~------ ~ Put to roducin ~~4t_~l~tc~ac._ ~rn__l'X"Ui;1'c~{ P g -'`- ~ - - - i - - - ~= ---~ ~ ----- The prod~ ICtion for the first X 24 hours was ___'~ ?' ___ barrels of fluid of which ____~___% was oil; _____~ __% emulsion;~____~ - ' % water; and _____ % sediment. ~ y, Gravit °B~. _--_______________________________ If gas wel~ , cu. ft. per 24 ho rs ___ __________-__-~ Gallons gasoline per 1,000 cu. ft. of gas __-______________ Rock pre sure, lbs. per sq. i . ___..__________________ I EMP LOYEES -------------------~ ------------------------ -------, Driller ---------------------------------------------------, Driller ------------------- ------------------------ - ,Driller ----- ` ---------------------------------------------------, Driller ~ FORMATY OI`i RECORD FBOM- ~ TO- I TOTAL FEET ~ FOEMATION I i I i GAS LL OPEN FLOW POTENTIAL TEST ART 4-POINT TEST Test Initial ^ Annual ^ Special Field Reservoir J~ ~ "' l `~Test Date I ~ ~ a ~. ' Operator Lease ti['ell \o yy ~'~II~ ~=Ii~T.iC ~~ .}~~r~c~1~y:1Ali LrU~~• ( ,{, e~„°;i p ~`~~1$'4e..7.~'~`I;~ <I $•'~~a #, u .°.~.~~ ('aunty Location Cotnpletioa Date Total Depth T/Pay Producing } ~aqq ~~gg cc~~ gg~~ I I Interval Producin Thru Reservoir \Cellhead CSG. Size R~'t Ft. / I.D. Set TBG. i CSG. X ~~tr~erature t 1 ° I TprpQgrature ~ i tT ° ~#t ( ( I F F TBG. Size \~ t/Ft. O.D. I.D. Set r Gas Cravlty Avg. Prod. GL Gas-Liquid Hydrocarbon Gravity of .~ ~ ~.l) I ~~~ /~ 3. I I ~ ~;!J ~; I IlepaHt~) I ggt~,,~(~1 I ~p~~ 1~do \IfF Der Bbl. I Lipitid (Api) P1Pelin Connection I Type Taps ~?-1.~~"` ~1.~~ _(~ ~n bilge f}~ X 3lultiple Completion (Dual or Triple) I Type production from each zone ``7..It~~,C 03't~ ~rt')fl:~~.~'~t,~.0}~ ~`",`i.'dl~i~ ~3. ~OI1G OBSERVED DATA Flow Data \o. Time of Flow Hours (Prover) (Line) Size (Choke) (Orifice) Size Press. ~-"gO~•gs~ prig Diff. h w Tubing Press. psig Casing Press. psig Flowing Temp. °F 3T el e~~~~t` ^.~0 " ~~ Fw: yw. s. . 2 i 1. e~ G~ e E ~T # ~. ^! C et c7~q 1r~ c 3L~ ` i ( ~j e ~ t~i 1 ~#'3 r~ ; r ~ t~ 3 *.?4 f ~ ~? ~ 2. a & ~ .~g p ~ ~ C3~ ° ~} e ~ 6`a ~ J. ~ k K~s'?~. ~ ~ g s"J~.~3 r y 1 ( ~ n tgy ~~ . r q ~n ~ g a ~p r e ~ ~ + 4. ~ ~ta ~ y~st ~: ~~ ~ ~. )~~ FLOW CALCULATIONS No. Coeffi- cient (24 Hr.) h p w m Pressure psis Flow Temp. Factor F t Gravity Factor F g Compress. Factor F pv Rate of Flow Q biCF/D 3. +lo~dt3~~ 3.~~°.+~ 6io e~le ~. r~~~i[+ ~. s~:~ ~.~4~' ~.~.t 4. w7r+3~~iI1 ~w~~)tX {~r~)~ Lr`e3Vt1Li ~r~~'~ ~`~~~~ PRESSI'RE CALCULATIONS sv s3 4'T P ~ ~~ ~~~ ~~ ~"~~~ (~='1§~ Cal P w w (pieta) ~' FCQ (F @)s (F Q)e X 1- e's Pw PC - 1'~ . P P ~112.~i t Z T3 : ~ o ~ J ~ r i s7~;,i t o ~ `~ ~e %~•J~ ~ y ~ w c 2. ~r~~~ ~r~~ ~ rs:v~`~ t11. ,~, ~ Lim ~i`~.` Absolute Potential n 14j y ~ bLCF/D :~- CO ~' ;.C C+g' (aa.'$; ~~~._` X13 .~.3~t~'Z'I.C'~k3 rr u •r ~r .~ r ~ ,e CERTIFICATE: I. the undersigned. state that I am ~i16_-1i ti~X ~- ~ ~' ~~1`'` '^° O T~ • (company), sad that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of n-Y knowledge. n Alaska 031 sad Gas Conservation Commission Gas well Open Flow Potential Test Report (4-Point Test) Form No. G-1 Authorized by Order No. 1 Effective October 1, 1958 ~+-'a~ INSTRUCTIONS This form is to be used for reportuig multi•poiat back pressure tests on gas wells in Alaska, except those on which special orders are applicable. The log log paper used for plotting the back pressure curve shall be of at least three inch cycles. NOMENCLATURE q .Actual rate of flow at end of flow period at W.Ii. working pressure (P ,), MCF/da. Qa 14.65 psia and 60~F. P =72 hour wellhead shut-in .casing (or tubing) pressure whichever is greater. psia c P =Static wellhead working pressure as determined at the end of flow period. (Casing if flowing thru tubing, w tubing if flowing thru casing). psia P =Rowing wellhead pressure (tubing if flowing through tubing, casing if flowing through casing.) psia t P =Meter pressure, psia m . h =Differential meter pressure, inches water w _. F -Gravity correction factor g F -Flowing temperature correction factor t F =Supercompressability factor Pv n -Slope of back pressure ..curve ~ - GL .G times average producing length of flow string , mix Note: If P cannot be taken because of manner of completion or condition of well, then Pv must be calculated by w adding the pressure drop due to friction within the flow string to t •s F Q and 1-e are factors utilized in calculating the pressure drop due to friction. c .~~ AGNEW AND SWEET fi'rOd~etcfion A CORPORATION 3914 GILMORE AVENUE SrlCC1R123~3 BAKERSFIELD, CALIFORNIA WIRE LINE SERVICE REPORT COMPANY Pan: American 1'etrolua~m Corporation SERVICES DYNAMOMETER PRESSURE SURVEYS TEMPERATURE SURVEYS PIANO WIRE LINE SERVICE ACOUSTICAL WELL SOUNDING SERVICE AND SPECIAL SERVICES FUevIEw 7.2267 FIELD `t'est Forel~.nd. WELL No. ~Yest ~'arrla,nd #1 PURPOSE OF SERVICE: IZe~uested t0 CL'ar:f~ IOUr pOlIIt gas poteaitldl test. er reques e o s a ing p ug o es t ''am -2 afar v ve in "ll" TOOLS USED: aipTSle. DE<:Ld We1~:~~1t te'Sf,er, CT1t1Ca1 f101Y prCfYer&''. r o s ponezl s ~, 1~ire line u:ait hi ~.-'n { ressure 1Ltbrica,tor HP blan.':cin< r~.ms and conventional wire- line pulling atiL. running ~ COMMENTS: ~taz~ch 22, 1962 - .l e i , - I ~~ at Dens-li Servi Agn~ew~ fl.y to Location vii, Sea aeromotive arrive 10:3© A.bi. o~ _. to to AN 2•(,ON I i h 2 ~ u ' t '2 a d its e v arc 3, 1962 A for loading. Reu,¢$y to load lU:OOA~i. Sse. ~eromotive ~ gnew &c lbtgers . ` k u- oil tool retainer a arrive 4`lESt Forelands 12:30 Phi . U`nl o ad equip . e.nd ui- ment secured 3. 3U P9n Mares 24, 1962 Called 9:15 Pad to rnaF~e feEler run inu to set bls.nkin Agnew & ~ye~rs ~ plug in "D" nipPl e to test tu: iug. ~ eeler run U.i~. Marsh 25, 1952 l: in "D" ni le' ~ar down 2U times to set dotes. Agnew do ldyers 12:50 A:a; jar up to silear picls in runni.n -tool-did not inued u~ 'arrin 2:30 AEI take line out of measurin device to prevent cold working line- 3:OOAh~ to 5:00 L •a u -ta s s ~.u~,visla- ~3ecidec:i that rrei ~ht mate ial h«d possibly se-l,tled out of muci fouiin.~ tools. th ~ ubric ~tor 6.30 t~:v~ crew started ~hawinA7 with 00 ~ A 8 steam.. 7:CC A;~i still th~.wing when free o- orc;for ~~ep U : gnew flew to Kenai to pick up line ,_ a. d ' of sinker bar drop -red cutter and then to crater at 11:30 Aid-obtained cut at top of rope socke ` Swanson Kiver• to pick nP additional wire. line , :mob , - tc 5:00 Phi broke +'~L togas. Re$urn 10:30 AEI foals out of tubing ai.c~ removed ~~lur° 'rom "D" nipple. March 26, 1962 1:45 Ahi called, made Tesler run to "J" ni ple ~ 9244' Agnew 8c iriyers . naa rsgnew Esc .earl ~-7yprs BY r t DATE r ' ~ $ERVICESB . 1°'~'oduction AGNEW AND SWEET c-vNAMOMETER A CORPORATION PRESSURE SURVEYS{ 3914 GILMORE AVENUE TEMPEWATURE $URYEYS Specialists BAKERSFIELD, CALIFORNIA PIANO WIRE LINE SERVICE' ACOUSTICAL WELL SOUNDING SERVICE Aroo SPECIAL SERV1CEi ' WIRE LINE SERVICE REPORT .. - FAIRVIEW 7-22A7 COMPANY P'an American Petroleum COrp~OratlOn FIELD Vest F'Orland WELL No.'~est Forel:~nd #1. 3--26-62 'iPell was flowed on 3/8", 1/2" and then wide open for 3-1/2 hours and blowing clea.a.. PURPOSE OF SERVICE: 12:30 Pld make llP prCSSUre bomb with 72 Ot2r C OC Four Point l~'low Test' x:10 Pli hung bomb ~ 9375' TP 3420 CP 254 TOOLS USED: Dead ~'ei~;ht ~ ~~ Tester, Critical Flow 3;55 PM Shut in (Flare blows out) P~cover, Sub-surface Pressure Bomb, misc. tes 4s 42 Pbi Hack on t~~ru i/4" o rifie (Mare fizNael) COMMENTS: lia,rch 26, 1962 5 s 05 PM 3020 58 3f}22 375 •gnew ~ Mares (I/ " 3 26 6~0 2896 ~5 4 plate in flow 5s 50 PM 3025 61 2995 354 iced g~rower I~- 1.43~i0) _ - ~~~, (3/8" plate is flow pr~rr k= 3.I42Q) 3028 834 3029 83S 2483 854 2498 914 2498 855 ate 34~20~ SZ 8p0 3Z 1927 847 1942 g()p i~iaut teat with out bomb 2z I5 Ali (shut in than a to 5 8" 2•z 18 Ali wail on 5 8 or ic-e CONTINU~B NhXT SHF~'T 6s 35 Fli 3047 ?: 20 Pli 3050 ?:38 PM well on wi 67 ~r4 65 67 3 8" pl a t~ 70 8:15 P'li '1~E-- -24'97 ,~.. ~,. ~ z 72 ~ 8:45 PM , ~~, 2511 75 9:00 PM 2512 9 : 30 Pbi 2 51 ?7 Z4r00 Plii P 9:45 Pli 2518 ressure bomb found to br stuck-worked 12.00 • $ID Well. on thru 1 2" for 15 min st.il T stuck ~ 9375' Flew d ll 1 - 15 2' Ali 1314 6 . w wa ~ alrgres. 3,000 MCF/D rate. 12.45 • AM 1870 Z2 instrument cra.me free- aft 11 min of fl ° ~ 1895 1:OU Ald 4 ow. Z~rough t instrument out of hole 1 s 3D AM 1915 'T? aft~rr gaining permission of state' e:agineer to con 1:45- Alf 1904 ate) k= 8.SSQ0 j` _ - Bair--/Lgnerr-~ BFI` Ira oY LlAtE _~~~-- -- ' r AGNEW ANO SWEET P'rOi~ltCtt0lt A CORPORATION 3914 GILMORE AVENUE •S'~CC4Q,~18t$ BAKERSFIELD, CALIFORNIA WIRE LINE SERVICE REPORT Scab Agxex Marsh 27, 28 ~ g' __ BY DATE COMPANY Ps.n American Petroleum Corporation SeRVICEs DYNAMOMETER PRE38URE SURVEY! TEMPERATURE SURYEYf PIANO WIRE LINE SERYIGE ACOUSTICAL WELL SOUNDING SERVIGE AND SPECIAL SERVIGE6 FAIRVtEw 7-226,7 FIELD 'iltst ~'orelar~d '~tes:t Portland #1. WELL No. r ~~~~ 2 3 we on 3 on ice PKG~V~t psig i'ROVLRoF AM 1 7 TBG psig 1558 CSG prig 916? ,,pp Q$ F C~ Foltr YOIEtt ~~01III Tt3t 2:45 AM 1515 ?5 1551 9I® Sort Satety Ve.lvt 3:15 AM 1520 'T6 1550 908 TOOLS USED: M h Z?' 2 4:00 AM 1510 75 1540 8BS arc , 196 Agae~w 8c Myers- 4; 30 AHD 3380 9S€} COMMENTS: 6:00 AM 3410 8 5f7 7s 30 Abt {Bled CSG 850psi to 3410 8517 8s30 Aft to 12:00 noon ItitmOVCd flour test equip't ~ Pres <, re bomb a ui ' t Cameo A-2 Safety Valve March 28, 1962 Anew Stand-by. . closes-on 44 to 50 psi diff ti l t t tarn "n bole with. 2 1 2" CamcO "A- 2" $sfe.t eren a or a ra e of 1,800 ~ICF to 2,000A~CF valve. - 1s00 YM Storm choke set in. Cs.m~co "i" nigp e or at present vra11 conditio at d d t ni ment loaded aboard Sea Aeromotive•"Otter" n raw own of 3260 psi to 3%'8U psi 6:30 PM equipment unloadtd at Swanson ~tiver Sttip. surface r~ressure. Form approved. Budget Bureau No. 42-R,358.5. UNITED STATES ~,.o OFFICE _______ ~__ehor$~~g ________ DEPARTMENT OF THE INTERIOR I FACE NUMBER ____ ~-~~1~~~___________ ~, GEOLOGICAL SURVEY uwir____ _~_~~~_ 1•'S2l'~~Bl).€1._~~. LESSEE'S MONTHLY REPORT OF OPERI~TIONS State ----- ah.---------------- CountV ------------------------------------ Field ----~~~lr~t------------------------------------------------ The followin5 is a correct report of operations and production (includin~s drilling and producing wells) for the month of ----------~a~h----------------------- 19---~y ---------------------------------------------------------------------------- /Z~ent's address __ ~'.__Ja__~.s~:~ 7]..~ ____________ _________ __ Companz~ ~~"'-~-+?'~~'?'_~o ''~trt~l8ur.~ ~o• --------------------------------- an~1~Qg_~~__ ~1.~~~~------------- ------------ Signed ----- --- --~C~" _~: -"c`~------- ------------- ._ Phone ---------- -----------~~-~zl-------------- ------ ------- - ---------- ~45v'ent's title ---~.~~__~'S~D3~3__._'~~`~~±- SEC. AND 1; of . ~ I ~ TWP. RANGE WELL No. Dezs Paonvc.a BAEEEL3 OF OIL ~ ~ C3RAYIT° CL'. FT. OF U`A9 (~ E110L15aIIQS) CiALLON3 of QASOLINE RECOVEEED BAE$EL9 of WATEE (If none, so state) A $ ~I~~ ~d'i~~t of teet,~oroga»diaa »~ coa of p ) ~~ ~/ '31~ 14+ ~ 1 i (3 ~ i a U Q ~~ l/ ~ ~ ~ ~ I ~ u~ r"~-~ iY~+ • ~~ ' I ~ f ~ ~ ~ ~ ~ ~ 33RD ~I ~}tseucal ~~ ~ i ~ ~ ~ ~ ~ I Ai~sl ~~a.rch }1, 3(3z, j ~tan ~,3T 5, set ~:;~ er a ~ 8,442 an~ ran ~.4f3 ' water ~ ~~;ushion. to +.~st rote~ mi~aut 'a1 's `3j- ~er:~ E 6. s~~ j phut to ~~ Drell in f:~ aiz in ~i~ m ~r 4~ ~-~lut~ rtut~s. <ell ~:a of th~n j:~.~i ~~tsr =~~~n~~ ~ ~ L hater; ~ir :..10~ :tor 1a ,otter ~. l.f ? hc~~ra a~en b ~.ss , nd seat. too? . In ' ~ hrnt " ~~ tc.~I ~,~ ~ ' ns<, s ~.1 .sir b~ ~ 6 .ow iscrsasia~~ c ~ t dead X3442, to rart I h lt~ ur. ~ era tai: er et~ h ?, 1962 shion. l D~`1 tial tasted ~, ,~ shut in $ !interval ito j hrs : ~~~-2 , ~ ~aell o~ ~ ~a:; €sr sit a sned °~ith ,god dir blow air b nit ow ~ ~.? ly~ ~ain~ , iii dec d 4u es.siJ~{J]JII ~ okly in 2 R(J~ to weak . r~inu ~ 1~1 ~es • :~~.~en '3 e~ac hrs. ~ batto~l after 2 i hole f n g i b r s. ~ ~ to 3/"3 ". ;~ r . ov~ry ~2~'° ~~atf~ ' I ~t } ~ / ~ ! y ° ~ . . .3ax~ h 3 $ ~F 1 . 62 ^~. 7 I J.) ~ ~ . .L 7 .ri 4h ke r ^ i3 F !~ t a. t , 63 y ~ Rata ~ W4t~ V r LJ ttJi~~L.l. t0 t~~ f/. irate al ~ bbb' ~- 7 `3' . Initials ut i l hr. '£=~ d ol oaste> ~ :tor '~ r~ rs, fair blew da~are sin to ~a.l ~ ~ aft r lj laitzut ~, v" ~ ~ ..~sa ba:.~ " ~ ~ c~l ohoxs ~'ra~t l/'~ ~ ~' to 3~~". i~3r r air ow sin dec asil to very l~a.ll blaw az ts 1 if2 h s. ~$~ ~ ~.£ter ~. ~/~- h s ~.ecov ry 1 483' wat r cu pion plus ~~~' d ~ eelnex~ t out ~mx • ~karo ~, l~' _7 >i ~S .got ac;x r at 7~3 _~~ w.~tar aj.4 i.~n s.~~ tt~ t¢~ t i.t3rv 1 7b6-'~ ~. .c~i~i.ai shut in 1~ hr. .' t. of dens I 1/~~ hrs . ~a~ .r ntos~ ~€~ re~six~~ ~? small g irl ; ,~ ~:i:i.s., opene bottom ha a ch k~ o ~ / = wry 'it le i~ .crease. ~ eset t4. ~.ft~*r ~ ~ ~~rls. pair blow again dac a~i ~, t wea in ~5 ~+.i~ ~ apt tool f"ter 1 1 v yrs. l~r~ll ~i~° Low .~.ea a.t en Of J. t~~.34 ~ .,. ~%~V'' 7 yQ~1 t e':A yl...iJ ~ 1 t 11i.~1 ,.7 yw ;trz1.• .,.a.l n i~ ~' ~ .~y ? -,,'}t i to ~ eat - ~~v:.i~~r at 75~' ~~ - ~ ~t zr us'?~ n 4;a.s ,;ssd~ . a`a 1 ~~,^~,~~? hrs» ~, a ~~ min ~tro ~~ir ~')lc~w for a_ ro ~ J ' . l~i.~ ~r~ ~.;zal Z;~ ~so ~,:~:si ~ ~ :~ .~ t,~ ;. .~.£ter ? r. 3~ ~ » ~~cav~r4c , ~:. ~7 1~l1d• ~ 6, t'>d CC , ~ ~, it L7, i`~~ - ~>' A r ;y'lf3 J@t 3C~{~ ~ ) ~ 3t 7~C7"9' L p t'S3t ~,+°~ Gj'O'..w^~;j ~ [~ a .1 d i~! ~,-~r`,rs~~ ~Q~-'~~ 3Tt<~: r `l ~=~ ~ L!?i' £:Li:il ?''l.• ~t''J~l ~?1;'.• '~ ij.~ Yir • '`3.t'li~a: sr713i1 'Se,I`~=3~:'t! ~;?r 1 ?'b ~'li"» *,Jabb~ o f to a1 ~ bb s. in ~ h (5 bb19 wat r cushio stud ~ , ^.ly ~z.1 j. "~a'_l~i~ tool bs wit 47 ' o forntaetion~ fluff recc>vary.l ~.a.~ in ~aifh ~^. lu~rtb~ ~e.r and der- fast d crol • ~~e irate 31 744-4 wit + shots d er too~W. .an i{z ,?:?~u' ~~~' :.rill dive ~ res red to fl~~ ~~ ~I. nor ion ostl >'luid ( at 17~tJ ~I (.~ 2 ~ ~~'~t ~~h 7, 19 ties red P b twe n 7" acid 9 ~/8° cas ~ strings. Meld ~ d a.t I, ~ ~>I for ~~ rains. Ra and sat rrsta nar et 7 ' :~ usez®d wi lE3d s,a. rs c~~a~' t. ~s.^'.~ Tg~>h~d a~prc~.~ . 4 sic ~s e rent R~z r~tM nr o 74?'-t, s aes~ed A rfc~rati ns wi.tYt w5 sac~€s o NOTE.-There were _______________r________________--_-- runs or sales of oil; -------_--------=~------------------__-_-- M cu. ft. of gas sold;. _________________ _ _ ___________________ runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.-~~port on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Pbrln 9-3`d9 18-86766-9 u. s. wv~sanexr rn~rrnx~ oFf~ce (Januar91950) fmtCl3 i „aucee~ ', 3 s 2 ~}] J~° i2 e FORM 321 2-57 PAN AMERICAN PETROLEUM CORPORA ION P. ~. Boa 712, Anchorage, Alaska F 1 L E S U B J E C T RETURN T 0 Mr. Donald D. BruGae, Chief, Pe~troleu~ Bra~c~h ~Ir. R. Tip. ~r~3.~ IJivision of Dines and 83.nerals I P. 4. Bog '~7. Anchorage, l~laska I An~.orage, Alaska DEAR SIR: DEAR S1 R: We are transmiti~.ng herewith logs (fin~.l.) I as descr3.bed below, from the Pan A~erican West Foreland No. 1 we7.l, Cook Inlet Basin, Ala:lam; I E-log 1" =s ~Q~ (blueline) E-log ~~ ~ 50' (sepia) ~-1og In _ ~~~ (bl~ez.i.ne) E-leg l~ ~ 2fl~ (sepia) ~'hese 7.pgs are being provided with the understanding that the State` w11 keep x:7.1. information on the subs act logs confidential., as provided in SeQtion ~Ua8.1 of the regulations, unless approval for re:Lease i.s obtained in writing from Pan America Petrollewa Corporation. Please acknowledge receipt. ~ ~ /~ ~.,. %~ ~ C 6 Cj~~~, SIGNED DATE j ORIGINAL - RETAIN BY ADDR SEE. DUPLICATE - RETURN TO SENDER. TRIPLICATE - RETAIN BY SENDER. I I ~ ~ ~ ~~ StGNEO DATE FoaM 705 2-bl PRINTED IN U.S.A. To ~iv3.sio~ ~f l~i.n~a ~xtd 1~3.n~r~,7.a~ PAN AMERICAN PETROyOLEUM CORPORATION RECORD OF-IVtAPS TRANSMITTED Location ~1f3~3:02'~~Ql~ ~-$~~$ Date 4~3~62 PARTY NO. PRINT OR MAP PREFIX & NUMBER QUADRANGLE HORIZON OTHER DESCRIPTION REPORT NO. DATE OF REPORT PRINTED ORE REVISED REMARKS ~A-X0,3-D I 1 ~T~st Fora~7.ai~d lam. 1 - ~~ ' ~m I. - ? ~ b2 lu O~ bluelin~ CA-5~3-~- ~ ~n « a ~ $ .3.a CA-~OLt ~ a - 7" a - ~ 1~ _ 20i blu~l CA- ~!~-~ 1 " - ~ - " " 1 1 1 1 Attached is oneicopy .each of the above described prints. Receipt of above prints is acknowledged. g i' ~' C. Location ~216~'tOi"~61~ ~,~-8~~L8 g Date ~/~/~Z Y Y A`s 'FORM 470 2.57 V ~~ PAN AMERICAN PETROLEUM CORPORATION _, . v .. .._:...-~:».-,...,.~,.~-~ P. 0. Box 712. c~/c ~, Anchorage,. Alaska [S.~~C1 V G~ March 30, 1962 APR Re: Well Site Plat Petrotwnt Brooch West Forelands ~1 bivision of Minss and Minerat~ Sec . 21, T8N ~ Rl~W, Alaska Dept. of tJatural Resource Seward Meridian Department of Natural Resources Division of Mines & Minerals 3 29 2nd Anchorage, Alaska Dear Sir: Enclosed for your information and file are two copiesof well site plat ~~ertaining to Udest Forelands #1 Well, located in Section 21, Township 8 North, Range 14 West, Seward T~Ieridian. Very truly yours, PAN AMERICAN PET'OI;EQM CORPORATION C. A. Rector '~ Area Foreman log Attach. CC: J.S.C.S. (w~attach.) :a~ _.v ~ 96 ~ _C Z f '~ ooo/ _,, / ~ ~b'O~ '/~+~5 /~~/d' IY~1 /L '7.sS .~n-~ 7 ~'.cnvs, No.~'~ S '6L8 9/Y i ~ 1 s'1~'3 /~d~ S'OL 9 /~e rQNl~7~0~ 1~~M ,~,, Es, ~~, s2 s - ~,.. ., ~~. ~, . `i~~. N ``, r, .v~. r y~® «~~ t~a-~ ~` 8 ao •a~c ~ aci =fi ___ / Z . .~, -, ~ I -~ j~ ~~ -~ g ~ \ s N -~I ~~~ i o~ M i ..Y r. ~ ~ ... I N ~h'*~'.~~ac7 1y1J A/ 13~ ~ a ~'~6~~~/ S-'6LSDo/ Nsn9 /C~7~i7' ~ °9G~~ / 6' Z~'~'~0/ gnu', '~ v / E 'BL~~o / l~~ dS ~ ~.~~~~ m .~ Z 'oGSooi g'L/ h // 8i-1~ D ~~ FORM 321 2.57 PAN AMERICAN PETROLEUM CORPORATION ~« f~ Bo~c 712,. AnQhor~ Alaska F 1 L E SUBJECT RETURN TO Mr. Slortald b. Brace, Chief, Pt!t~~aatuR Ht~$ Nix'. R. '~ Crs~ n o Ines ~ Miner83.i~ P• ^ a ~~ ` Anchorag~~ Alaska I Anahora~e, Alaska DEAR SIR: ( DEAR SIR: We are traxiamitt~.x~ herewith ane I completes washed ctzt of wel"! s es ~ (surface to 13,~OU'TD) one I complete cut of gores I and 2, from the Pan American Petrole~uaa Corporation I West Ibreland Aio « 1, Sac. 2l, ,~ RI~W~ 5,~., Cook Inlet Basin, .~3.aeka, in accordance with your requir tom, I Please aclrnowled~e receipt. ~ 'his ~tterial is being provided with I the ux~derstandinp; that the State w3.ll kee~a all information on tYtel Meet I Pbreland No. 1 yell cani~idsntal as I provided in Section ZQt?8.3. of the re~u3.ations, u~lesa approve]. Eder release ~ i~t fl'bt~.ned in writing fro~a Pan American I Petrd}leum CorporStion. cgs ands wel3. history are being prepared am3 ~. be forwarded in the rear future. ~ !, ~ (~ I f `"'``"~ ~/~'` ~/~ ~~ ~~ I l ~~ ~~ prigi~.al Signed by I ~ ~` ~1/t~ I ~~$py~ m SIGNED ~ DATE $I GN ED DATE ORIGINwArLaa+-s RETAIN BY ADDRESSEE. DUPLICATE - RETURN TO-SENDER. TRIPLICATE - RETAIN BY SENDER. Z ~ Q ~, a ~ 1 O N F a ~ ~ F1 o to ~- {U s 'i 1S 1 iLL ~'~~,. ~'it~S u,~: ~liRVE E ` : ~ ,~ . <. ! _ . -- . ~ ~ t t r -~ ~ _- . ~ - ---? ~ c [ - - ' I - S ~ - -r - - t f ` 3 ` _,. . _ . < ~...~ ~ .. ._ f _ - -- - [ I - - - ~_ , ` - t I -=~ , , .: ~ ~ t , :. t [ ._.. _ . ~.,~ , ., I __.~ r. ....` o r I y - ~ r ~, r I I I 4 13 I ~ i 6 7 , ~ f g r t '-~ ._ F _t. i .L { ~_._. -'~ ---''... _ ~ ,.,, t ~ _.~ ~ -}_ 1 . { ~: ! 3 i al i f :~ - t - l ' i~ It r t t .-1 I, t I .. i taper~.tor Patr~ Arr+,tnc~.r- T~tfreleuin Cerr. Lease Wtst Forslahd iYel 1 I3o. '~ ~ i,oc +.t,ion SE 21 - aN-14W Vat~ime 1 6, 500 MCF/2~ hr. Date: March 27~ 1962 ~f' I I -- r r ~ . ~ ~ ~., ~ $ ~,x. t _, [ I ~ I r t { {' ~ _ r zl t z -t # _ ~ fi i ~ i r r r? L ~ ~t ~~ _ ,~ 1 t ~ I ~ I I r ~.-~ {- ~ a. +. _. _ r ~ ' I ~. .. ..r $ r 7r + .~ z ~.. i I _ ~ t 7 t t i t 1 ~ ~ : . I ; r j 1 ~ ~: ~ , I ~ ~ li + ~ t ~ _ ~ ,, r r , I ~ ~ . ~ ~ . I ~: I j.. :: . I i ~: ~ ~. }~ _'3 3 ~ t - ~ k .~ ~~ r 1 -.h r [ -+} t I . f l~ ~ i'~' ---~ -i' ~ ~ I ri t , ~ ~ ~ [ r i ~~ + 3 to , u_ .i i i I ~ Y1 t S t r t t~ 1 1 ~ ~ ! ~ I j '2..»t t z t ;; t 'r"""~'-` [ ~l ~ ~ 3 .: ~ I. '~ ~ IlI ~ t ~ t L t t r t'' ~ i ;1 I h r f 1 I ~ 1 1 ~ I t I t . ~ ( I ' ~ :.a _ .i ~ ~ it t A i t ~ - I ~ I. ,I ~ y . . ~ ! l t ' ~ ~ ~ [ j ~ ~ .. ~ t 1 , I I r' f ~ ~ ~ -f ! {{ t ' i tl F ~ !{ 1. ~ r r ~ i .. a ~ ,_1 4 S 6 78 9 7 O ~, : a.~. UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form approved. Budget Bureau No. 42-R356.5. ' r G }? ora c-~' LAND OFFICE -----==-=--=----=---`------------- LEASE NUMBER ---_~ '' _u^ _13 ~y)i; ~~i_-_------ t -- -° s fi ~ t° ~ 1 -_-- =--1-- LESSEE'S MONTHLY REPORT OF OPERATIONS State ----_=laska_________________ Count dc~t r. ~J ------------------------------------ Field ---i;I_ 1--------------------------------------------------------- The followings is a correct report of operations and production (includins drillings and producing wells) for the month of -----~=~~~°n,k~°r--------------------- 19---'--1' --- ------------------------------------------------------------------------- ,~lgsent's address --=~, )a_ L~o?c__712----------------------------------------- Company ---?'an_ _a_~eric_ _ ~'°tr_~1e~.zr! far. pe ----------------------------anchorage , Alaska ------- -- ---------------------------------------- Signed ---- -------`-~`l=~`-`=-~,~~------ ------------ -------- ~?~? 8-8401------------------------------------------------ ~15ent's title----~rea_Foreman Phone ---------------=---------------- - --------------------------------------- 8E1). AND Ijj OF ~ ,t, WP. RANOE WELL I NO. Dezs I Paonacsn ~ BARRELS OP OZL f'1 i VRAVITY (3ALLOxs os BARRELS oz• CQ, F^t. OF C3A6 (jII thOUS&II(a'S) GASOLINE wAmER (If RECOVERED IIOIIe, 30 Stale) REMARg6 (Ii drilling, deyth; if ahut down, aaasa: eta and reauli of teat for gaeolina content of gas) 1•; ~ i ! 8N 14N l O ~ ~ i i I 0 O II f I i r 0 ; 0 0 r:°rillin~~ 1~ °013- S~; ~ I ~ I i ~~ ~ I I ~.a.n 2~'S T:n~ 73 ~ ~ I ~ <~~ ~~ y~ ~ I i ~ ~ ; i ~ I "~; ! ~ ': 1.!1530°' , ??an IL'S L i t I ~ ~ I f I i i ,`.~, i .. ~ ~ ~ 10530° - 1.09~F ° , i ~ i ~ I `' `' ~ ~ I ~ ~ ~.! .Micro Caliper Log i ~ I i I ~ ` i i ~ ~ i _~ - i ! I 110530° - l??956° ` I ~ I , ~ I ~ i 1?an Scnie Leg '735 ~ ~ 10973° Ran Gamma og ?360° -109?8° Zan IF5 Log 109?g ~ I I !~ ~ ~ I 211'?2° Corer 2~' i ~ I ~ ~ ~ecovered 5° , I f I I ~ ~ i 11,32?° _ 11,R~%° ~ J I ..f _ l NOTE.-There were-------------~-----------------____-- runs or sales of oil; ---------------------~-----_----------____-- M cu. ft. of gas sold; _________~__________________________________ runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-329 111-'d5768~ U. 9. GaVERNNENT PRINTING OFFICE (January 19~) 60'- ~g ~~ 9 0 - ±~a ;~ 9 - ° V UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY LESSEE'S MONTHLY REPORT OF Form approved. B et Bureau No. C- cKora 42-R356.5. __IND OFFICE --56-17 LEASE NUMBER UNIT------------ - --- ---- R? $, OPERATIONS State --- - - Wildcat ---- ----------- County ------------------------------------ Field ------ ----------- ---- -- --- -fir-� -- -= = ='=--------- The follozvine is a correct report of operations and production (including,an proclu�t r„ zvells) for the month of --- November ---------------------- _ 19'1_, -__ ------------------------------------------------------------------------- ✓1ent's address----------------------------------------- Company a rsei ` 1,�z'1. t°z�l ----------------------------- -- � ------ (s--------- Sis7aed -- --------- -r'--- e7 L - ----------------------------------------- - - --------------------------- Phone -------- --------------------------------------------------------- -<igenrs title ------ �-'�- lors fi----------------------- SEC. AND 4 OF TWP. I RANGE WELL I No. DAYS I PNODVCED IALLONS BARRELS OF OIL GRAVITY Cu.CIIho OF GAS (III thousands) OF GASOLINE BARRELS OF WATER If ( REMARKS (If drilling, depth-, if shut down, eaves; I RECOVERED none, So state) date and result of teat for gasaline content of gas) I0 F1 ETI L 3!:',4�M rg i/`��el t '�t�of i I � i 1 11� � � gFt. �g2011 I�di�gi�.�Y. a.� Yl�T�.L✓I. ? [Jgi y}RL2 out con-61cf--or E{ith-- 19b 2 f i iii J-555 F Irf E fic in cere-rted wi- i i deg w1ia q��. d x;117, 4�p t. o 9— set atN 116c jts of f:r3-2.- i Ox 'eta t i bottor while going I bole. a Faash Ftc c aps j, 2 Ran Schluumberger E. ILogs a`PAmm Raz 5onJ Micro-Galir and continaus d i pr.e ter 1 7367 ft. Pia no NOTE.—Theregere______________________________________ runs or sales of oil; ----------------- M cu. ft. of gas sold; -------- _----- ________----------- runs or sales of gasoline during the month. (Write "no" where applicable.) NoTE.—Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-899 (January i m) 1"576" U. G. GOVERNMENT PRINTING OFFICE m, '/8" 736 i X6 in sa . C' at UN[TED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Budget Bureau No. 42-R368.b. Approval ezpires 1~31~8. A ? .AND OFFICE ___s~ILCw2~xs~.,~e____________. LEASE NUMBER _.S.)JSSJ~_________________- UNIT ------------------------------------------ G,lest Foreland ~kl LESSEE'S MONTHLY REPORT OF OPERATIONS State ------8,]...aska---------------- County ------------------------------------ Field ---------------~Jilsi~.at------------------------------------ The following is a correct report of operations and production (including drilling and producing wells) for the month of ------OctQb~_r_---------------------- 19Ezi~l--~ ---------------------------------------------------------------------------- .~gent's address _ 444 - _ 7 th_ Av_enu~__~,~I~_____________ ___-____- Company -Pan_~alerfcan.__PE~rnleum__ C'.nrporati oa Cal ar Alber C -~ -'~`" ------------------------ --------g ---y ~ ----------- to ~--- anada- -------------- Signed ~ -•--- -'----~°-~„-- ~ -==== ------------ - --- Phone -----------------AM=3~i13U__________________-__.________-------------------- .lgent's title _-Ass_'_t--~.i-v-s-aa.~--~roducti3on--Supt. C of SE/~ SSC. AND of ~ TWY. RANGE ~ ELL NO. Dwze PHODIICaD BA$8HL8 OF Ou. OHAVITY OII. FT. OF OA9 (ln thousands) OALLONB OF C~A$OLINE RECOYEHED BARREL.9 OF wATBE (If none, so state) REi12ARB8 (If drilling, depth; if shut down, Danes; ~~ aDd reanlt of test For gawline content of gas) NE/4 8N 14 1 Nil ~ Nil Nil Nil Nil Nil ct 1-5, Building ~ ,Sec " l nd location. s ct. 6-13. Buildiz ~ ,, ~ ! ; - ~ Dad & location, c~ I ~ ~ tJ `.''~ g -~ 4 Bing set up, unab7 0 land barges witt ig equipment due 1 ~ad weather. Octoi~er 14, Barge nioading w/first :'~ frig equip. ct . 15 - 4Jorking c amp. ct . 16 - 2Ei , Barge: oving into locatic ith equipment whey Bather permits ~: t nloaded, ct . 27 . Crews rigs p all day & well ed at 11:00 P.M. 0- 27-Eil . ct. 28. Drilled 2E ole to 67' - stilt oving in supplies urge. ct. 29. Unloading /cement & gel in < o set conductor p7 I ct. 30. Unloading r31 pipe & fuel ~, ~ arge . 1 ct. 31. Drilled 2E ole to 84', cement __ r.Tnr NOTE.-There were -------------~~--------------------- runs or sales of oil; -------------AS2---------------------------- ~ cu. ft. of gas sold; no ____________________ runs or sales of gasoline during the month. (QPrite "no" where applicable.) ---NOTE -Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. IFOFIrI 9~3Q8 1B-$5'J$8-$ O, 5. GOYERNNENT PRINTING OFFICE (January 19b0) Dad .g mp e 0 Dad .n ~n sing ;ing pud- Ft by barg order pe• 'r om It ;_ Bndget Barran No. 4}-BBdI<.4. ,bbtln b-98<i a APP~val expires 12-31-60. {Feb. 1981) y (SUBMIT I1V TRIPLICATE) Land OA6ce _.. ___-- ., .~ .., ~ UNITED STATES Lea..IVo. ~$~+~~'---.-- --- ~-----E----~--- - DEPARTMENT OF"THE INTERIOR unit_.___~~~~.~~~.---- GEOLOGICAL SURVEY ~ ~ ~~~ SUNDRY NOTICES AND REPORT'S ON 11Laks Uept. of htacuzal Rcsau:~as NOTICE OF INTENTION TO DRILL-------------- -- ------- ------ ------ SUBSEQUENT REPORT OF WATER SHUT-OFF----__-- -----_-._--° __--- NOTICE OF INTENTION. TO CHANGE:PLANS_______ ______________ ______ SUBSEQUENT REPORT OF SHDOTING OR ACIDIZING_______._____ ___-_. NOTICE OF INTENTION TO TEST WATER SHUTAFF_______ ______ ______ SUBSEQUENT REPORT OF ALTERING CASING____._________________ __ .-• NOTICE OF INTENTION TO RE-DRILL-0R REPAIR WELL__ ______ _____ SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR _________ _.__ ___._ NOTICE OF INTENTION TO SHOOT OR ACIDIZE- ---------------- ------ ;SUBSEQUENT REPORT OF ABANDONMENT-_----- --- ---------°-- -----: NOTICE-OF INTENTION TO PULL OR ALTER CASING------ - ----- ------ SUPPLEMENTARY WELL HISTORY----.---- -------- - -------_----_ -----• NOTIC OF INT~~IE1I1NTION TO ABANDON WELL- _ --- °----- -~j - -~- ~ ------------ -~- __ ------ -------•------- --- --------- -------------- ------ ------------ ----- (INDICATfi ABOVfi ®YCHffCK MARK. NATURfiOF RF.YORT. NOTICi, OR OTHfiR DATA) Well No. _____ 1__________ is located __~" ft. fram__line and __.$ft. from {~} line of sec. _____,~,__ (F1eld) {County or 8abdivision) (Statutory) The elevation ~>xi~ioeollla~wlt above sea level is ____!QQ___ ft. ~,lli DETAI~.S OF ~ WORK (State Hamer of.and ezpacted depths to objective sands; show ai>ose, weiYhts,,and ladsths of casin=ai l~icate muddlnt jobr, aena~t~ §n= points, and all otMpr itnpOVtant proposed work Tlt~e ' atd~,#~.~2 ~L'arm-ti3.on f,~l ~arallh~d ;~ #~do Vi.~# x+art~1~'I~r lbt3.~ ~1 ~1-1~R ~ 1'Ir37.~.~ tp~rctr+~! 10 I understand tlfat this plan of work mwt reodve approval In writins b3 the Cieolo=ieal Surrey before operations map be eommeseoad. I ...Address- -------_~~'- - --~----- P --- ----------------- . ~--~--~-- BY ------ -------- - -------------~?--=--- ~. Fi -------------- ------- --------- --------- ---------- --------------- Title ;~; - - 6Y0, 9 l8 507 -- -- - ~..e -- --------_ "~~__.. ~ - APP~I~AT~O€~1 FOR PERa~1~T TO ~R~~ L, [°sEEPEBN OR PlllG 6~'CSC j APPLICATION 'I'O DRILL'~J DEEPEN ^ PLUG BACK ^ NA1vIE OF COMPANF OR OPERATOP. DATE Ad~ires City State i~~ DESCRIPTION OF `YELL AND LEASE Name of lease Z~'ell number Elevation (ground) :~ ell location (give footage from section lines) Section- a~~nsiiip range or bloc - & survey d F iekl ~ reservoir (If w"iidcat, so state) County ;~i~~~~ ~ Dis':ance, is miles, and direction from nearest town or Bost office P;earest distance from proposed location ~ Distance frcm proposed location to nearest drilling, i ;o property or lease line: co;npleted cr applied-for well on the same lease: feet I feet Proposed depth: i Rotary or cable tools ~ App: as. date work will start v dumber of acres in lease: Number of veils on lease, including this well, ~ completed in or drilling to this reservoir: JTL~ If lease, purchased with one or more Name Address ~,velis drilled, from whom purchased: Status of bond $i5~3,€~4~t} ~~~i~~u3i€I~ ~~~s~ ~~ X13 ~~ ~~~,ra~, ~~ir3.;~~ ~~~~. ~. ~ ~~.~, r'~~~~, ~.» ______ Remarks: (If this is an application to deepen or plug back, brieRy describe wark to he done, giving pre: ent producing zone and expected new producing zone) .&~~~r ~~.~,€?x~ ~'~", ..~3_"`~3~$~,~'r ~~,.~.~. ~..;i"i: ~s..~«-.a.'*',M3. .'Y.i c~'.c .>~~°. .A~t~-3i ;~ ,a. ats ~v1~AZ~ ~i`~i~#'i53~i~ >b ~' ~l~ _",~: .v.=of~` ~ u:~~s1 ~f ~..L~. ~ '~:~'#`~~. 3a,E3:;:~3. ~.~i ix;~a,~3"w~ ~.k`~. ~` ~~J~ ~!'d$~a A7)t'V . ~1'.i$ CERTIFICATE: I, the undersigned, state that I am the ~~~~" of the ~ ~~~~~ ~~~~~~~ ~" (company), and that I am authorized by said company to make this report; and that this report c~as pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of my knowledge. ~ ~ ~ ~ ~ c ~, Signature Permit Number: ~9 ~(,~ Approval Date: OCtO'Jer ~. 1961 1 A Approved By: ---~~I jr ~~ s Chief9 Petroleum Branch Notice: Before sending in this form be sure that you have given all information requested. 1VIuch unnecessary correspond- ence will thus be avoided. See Instruction on Reverse Side of Form Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. 1 Effective October ?, 1955 INSTRUCTIONS READ CAREFULLY AND COMPLY E'ULLY For the purpose cf this determination attach hereto a neat, accurate plat, map or sketch of this lease, section,. block or lot locating thereon the proposed site for this location. Plat shall be drawn to a scale which will permit the facile observation of all pertinent data. Show distances of the proposed well from the two nearest lease and section lines, and from th° rearest wells on the same lease completed in er drilling to the same reservoir. If the location requested is not in conformance with the applicable well-spacing rules, show all off-setting weds to the proposed well, and the names and addresses of all adjoining lease or property owners. In event plat is filed for the purpose of designating the drilling and producing unit, or proration unit, on which the proposed well is to be drilled, the boundaries of such unit shah be shown, also the boundaries of all other such units attributed tc other wells on the same lease completed in or dri_iing to the same reservoir. T're acreage contained within each unit shall also be shown. IDo not confuse survey lints with Ieas2 lines. The sketch or plat should show your entire lease if possilele. If it is not practical to show the entire lease and the plat shows only a section, Mock or lot out of your lease, you should clearly show that same is only a part of the lease. IDesiynate scale to which plat or sketch is drawn. Alsa c es?gna,te northerly directian on the sketch or plat. s r 1~i~i :=~~r ~il.ling Su~aerix~~endQrt~ Pars ~~i~an Pe~role~n Corgoraziota Box 1~~ ~lnchc~rage, Alaska Bear Pipers Please he advised that yau~ aPpli.cataoxz for pex~~.t *_aa dri~.~: well ~Vtr. "West ~'ore2.and" 1, Sec. 2t, T.8P1., ~,. 1.4 W., Se~ra~d B ~ ~. s,s apg~ved aub,~ect to the same c®mlitic~ns set t©rth in ~ letter dated tDe~~'~ey 3g 19n1, regarding ynuz well No. igStec~a,tna Creek 'State°' ~;. Please £~il:e a pl~.t showing the corxect location as stst~~€ as the su.:~e~ is c letecl. ~$zbb Yc~;ors ~aery trul}, lto~cald t~. Bx~xce Chief, Petroleum branch s5 . e C f ~`" YY ~~ r s ,,~ +~ * -kE lq wsLL ~,1.~6 !t~~ ... _ ~~= -_~.- --- - .~ _gt~-srdidl~ rltl~iil' ~,~_ _ ~s~NMsz ~2x, . ~~61 _ -- -- _. r Ri[f. '---r - [irERrs, _ ~i RClOBC4 WRMEeS "" ~•~ 2000 -7100 ii .. _. _ ~. _ III~IetioN ~ 7500•TD ~ W,P.P ~ ~[",. MDR ~-Gii~~ °"`~00 X00-7500 7500•TD !~ Tertiary 0- •8000' ' ,~tlwow 0•Z000 2000.7~p0 7500-TD t" /~etar 0-2000 2000-7500 7500-TD Cratsesow :8000' - • 11,000 ~.~., _ -- ~r Jurur is 11, 000' _ 14,000 Mrd Gad AMlysar 1~ 0•TD (Portable rib-aonnted recorder) __. lwE - - SVk[i~t rEAS ,. ~~ ent of all aasiplea and cores to be seat to '1ti1sa •Leb. for ~ sad pollen analysis. A cot of all cored sands to ba ;; ~ fat to_Aachoraga for P a~-d P and Sat analysis. k... PEun4s.. .....____.__ __. ._.- _. ~ . &` !I I; ,.MrfAVPC -. "npiu cuinxc~t~roits _ ::-__ ~~ _ :', fMfOYf W• ytr P,i, JM;(.~.4'~'.M[ ~ rq~P.4 n~:~ 0•TD 10' 0-TD GaolograpL or as requested by (isolo=ist! , __ _ _ 1 RfYM1P,4 ... __..... _ _ ._ _. _.-. -._ 1 q. f"~'3 ;~ r MT[Mµ trPE .. - ~ ,~~ ,.NEP ., ~ E 0-2000 Mative nsa i Qel~rx. siax:90 ~~ Ft -- Ataiatain solids ' ~~,~~ , i - content 1Qx or hrs. '~ .~:;~ Gas aonea is tir~~t " 7500' . ~ td~ ,. 2000'7!00 Natar ~Iay require additional k~ tuh 's Cal ChNical 10~-/gal 28-60 scud wfiht . ~ ?~ ~"~x~' 7~•TD ~~es~cal- 10~/tal 28-50 10-15 ,, , Dr111 leas 2000' to 7500' Mitb water, suddi ~i naetasssy ~ uP o•lY if '~ •o~.L or.,„ 14 000' '~~~ ~~ ~ , _ -- u _. _. _ __ +~~[ r .____ N.[Mr.. ~s6 Ltt • cErES~ ~ - _. _ a:.a,ub l~[c+N`.t w ~. y ~ ., '~, O °100 [ !IF SI.P'P7 Or+ ~[ L~NJIy`,~y~ L t, 0-~ ~ 1318 ~•~~E 'l~artace. Neat • 2X CaC12 ~~'~~ '[ Shale and 8aad 0-750p' 2~ 300 shale and Sand ~ ~ , ~ ~ r{~ ~0-TD 7.r ~~~ ~ sand ~ ~ ~ `~:~~ sane ~ ~~ '~~ ~ r; k _ _ ~< ._ ~'. Drill 20' into • - isaificast show , cdt cores and, if Marraated, take drill stes test, '~!s ~Prs=rssti is sub~aet to chase to Insure wll is drilled to TD on schedwle, Schlus~0n sidewll cores to be takes is sands of interest on legs, `' _=---~. connE~ugE raeM-~r _ - _ _ To ba +let~ipMi and a _~ _ . _ _ . . PP;owed by Division prornctiea S»periatsadewt . T- :.: 3aneral *tmsran is to log conaistsat with cu w; pr thaa x~ ixtarabdiata curl . faits aidwall ca:es is sonds of iatarasc, , Prograc- ie subfeat to 4 ~• BYbdegaewt testing daes to be threrih tre cuit~. Too ts~t#ni to iaerre be wll ~ ,rillnd to `~ eg sai~rle, This wll •i1T be irill+r+# gs a tilt holy, ~d 1:rtlers~ation to ortaida partners wl11 1e handled h ~pioraew ~eparit~t . = -- - ~PYPy1 ~: ._ .. ... .. _.« _. _ Y ~ .~ C~ - sta~slaitsyr ~ ~ .P.P<,[p ____ ~..~:~ _ ~jV ''~a1J~ .. .._ .: ii~satP ,I.P IM:r 4~f4r _ .. __~ _~~r~l~~j~~ II U;1 •.. ~aY •.. ~~t.• l ~r51RKt 8(~ :'. .I1 ,. DivisionGeoteiist ,~.:,:-sue,. _ ....~. 6.0•P• ARRAN6E~ENT"A" REMISED iAY f tN, Hf t DRESSER SLEEVE SPLIT NIPPLE !SPLIT TO- FLAMfE FILL LINE FLOW LINE FOR DOUBLE BATE WMEN ORILLIM6 -PIPE RAYS ON TOP - BLIND RAMS ON BOTTOM ~ / WHEN RUNNING CAStNB-CASINB RAMS ON TOP / v - fLIND RAYS ON BOTTOM DOUBLE BATE OR NrDRIL --~~ --1--- - SCNOKE 1 Ad jr•N~N 1 PLlli OR SHOP MADE SWEEP TO FLARE PIT CHECK VALVE SPOOL ~ BATE VALVE ELL NO MORE - - - ~.-_.. THAN •6•BEMD GATE OR - PLU{ VALVES ILL LINE ~ ' - PLUG VALVE PLUG VALVE f--RELIEi LINE PLUG OR GATE VALVE + ~ Ed••d Kill Lin•ro wt•iM KEEP C1~KE MANIFOLD ATrs TO FLARE PIT •1 •sb-•kaetw•oa otf-yit LEAST {'ABOVE MATTING SPOOL •IM N P••iNf•f• ea•actbn DOUBLE saTE l WHEN DRILLIN6-PIPE RAMS ON TOP PLUG OR -BLIND RAMS ON BOTTOM BATE VALVE _ WHEN RUNNNIG CASING-CASING ~ - TO FLARE PIT EAf/lP~UEMT M'/TN/A'DOTTEO '" -' RAMS ON TOP- BLIND t/NE To BEfIlANisMEOSr RAMS ON BOTTOM ~~ ~ CHOKE 1 Po•itiw In••rt 1 PAN AMEA/CAN ~~ ~ ~ .~ i l ~~ VALVE TAPPED B PLUGGED I/2• ~ \ ,/ ~~ 1. Both ppreventors to be hydraulically operated from an accumulator which will open and clc:~se hydril at least twice without recharging. 2, Equipment through which blt must pass must have at least as large ID as casing being drilled through. 3. 10111 line and choke connections must be 2" or larger nominal diameter. 6. A Kelly Bock must be used on Kelly, S, A drill pi a safety valve equivalent to Shaffer Model SS must he available on the rig floor at all times with proper connections or subs. 6. All equipment -sentioned above must be 3000# working pressure or stronger. 7. Three 2°° diameter or larger bleed-off lines to be Installed without additional fittings or angular bends from chokes to flare pit and shall be securely staked dove. S. Spsol between prevsntor• and spool on choke manifold should be rotated to make lines as straight as possible and alloy good access to controls. 9(a)No screwed, nor screwed and welded, connections will be used upstream frogs the chokes or relief line valve. (b)No screwed, nor screwed and welded, connections will be used on or upstream from the check valve on the kill line. --' ~.. t.~'2^~R1~'^an2,~,~-^lre r,,JScri6~'~4FF. ~R'f~l5~a~,c r..r,~. - :._. ,. ~ ..frlR~RH.x>,.