Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
165-011
By Samantha Carlisle at 11:31 am, Jun 15, 2020 320-259 Digitally signed by Taylor Wellman DN: cn=Taylor Wellman, ou=Users Date: 2020.06.15 10:38:41 -08'00' Taylor Wellman DSR-6/15/2020SFD 06/15/2020gls 6/15/20 10-404 6/16/2020 dts 6/16/2020 JLC 6/16/2020 RBDMS HEW 6/18/2020 NOTE: LS may also be penetrated by the perf gun. CIBP/CMT at 4350 ft in Long string will isolate the zones below. on short string CIBP in long string. Note: perf gun will penetrate both LS and SS. 4546' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 0 R ! G ! N A REPO OF SUNDRY WELL OPE TIONS 1. Operations pedormed: Operation shutdown m Pull tubing ~ 2. Name of Operator Union Oil Co. of Calif. 3. Address PCB 190247, Anch, AK., 4. Location of well at surface 404' S & 423' E of NW Ocr., At top of productive interval 2426' S & 4218' E of' NW Ocr., At effective depth Stimulate ~ Plugging m Alter casing m Repair well ~ I 5. TypeofWell: . ( UNO CAL ) Development 99519-0247 Exploratory Stratigraphic Service Sec. 7, T4N, RllW, SM Perforate X; Other Sec. 7, T4N, RllW, SM 2508' S & 100' W of NW Cor., Sec. 7, T4N, RllW, SM ~totalde~h 11. 2421' N & 1704' E of SW Corner Section 6. Datumelev~ion(DForKB) G~ 7R' 7. UnitorPropedyname Kenai Gas Field Well number , KU 43 9. Permit number/approval number 10. APl number 50-- 133-20371 FieldlPool Pool 5.1 feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Sudace Intermediate Production Liner Perforation depth: Length 5,707 ' feet Plugs (measured) 4,783 ' feet measured true vertical 4,997 ' feet Junk (measured) 4,830' feet Size Cemented 52' 20" 956' 10-3/4" 5,687' 7-5/8" 4,691'-4,712', 3,954'-3,971', Tubing (size, grade, and measured depth) 2-7/8" , Driven 1,100 SXS 575 SXS 4,766'-4,845', 4,012'-4,073', 6.4#, N-80 5,315', Measured depth 52' 956' 5,687' 4,902'-4,926' 4,117'-4,137' 5,111', 4,997' True vertical depth 52' 930' 4,767' Packers and SSSV (type and measured depth) Brown Dua 1 Hyd. 13. Stimulation or cement squeeze summary @ 4,284'; Baker "D" @ 4,590' RECEIVED Intervals treated (measured) Treatment description including volumes used and final pressure NOV 2 1 1989 ~Iaska 0ii & Gas Cons. Commisslorl. , , 14. Prior to well operation Subsequent to operation Represen, tative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 0 2,200 0 0 0 2,850 0 0 Anchorag~ Tubing Pressure 320 320 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run m Daily Report of Well Operations .¢¢,.. Oil ~ Gas X Suspended ~ Service ~ , , 17. I hereby certifythat the foregoing is true and correct to the best of my knowledge. Sig,n,ed . Roberts Title Environmental Engineer Date ] 1/20/89 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE KU 43-? Reperforating procedure- 1. RU wireline unit 2. Pressure test lubricator and BOP 3. RIH 4. Tie-in 5. Reperforate following intervals using Halliburton Wireline's 2 1/8" Dynastrip guns at 4 SPF and 0 degrees phasing:: 4691'-4712' 4766'-4845' 4902'-4926' 6. POOH ?. Rig down · STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION O i~ APPLICATION FOR SUNDRY APPROVALS 1. Type df Request: Abandon __ Suspend __ Alter Casing __ Repair well __ Change approved program __ Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate __ Pull tubing ~ Variance __ Perforate ~ Other 2. Name of Operator Union Oil Co. of Calif. (UNOCAL) 3. Address PCB 190247, Anch, AK., 99519-0247 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at sudace 404' S & 423' E of NW Cor., Sec 7, T4N, At top of productive interval 2426' S & 4218' E of NW Cor., Sec 7, T4N, At effective depth 2508' S & 100' W of NW Cor., Sec 7, T4N, At total depth 2421' N & 1704, E of SW COrner Section RllW, SM RllW, SM RllW, SM 6. Datumelevation(DForKB) GR 78' feet 7. Unit or Property name Kenai Gas Field 8. Well number KU 43-7 9. Permit number 65-11 10. APl number 50-- 133-10093-00 11. Field/Pool Pool 5.1 12. Present well condition summary Total depth: meaS'ured true vertical Effective depth: measured true vertical 5,707 ' feet Plugs (measured) 5,315 ', 4,783 ' feet 4,997 ' feet Junk (measured) 4,830' feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: ~ngth 52' 956' 5,687' measured 4,691'-4,712', truevertical 3,954'-3,971', Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size Cemented Measureddepth 20" Driven 52' 10-3/4" 1,100 sxs 956' 7-5/8" 575 sxs 5,687' 4,766'-4,845', 4,902'-4,950' 4,012'-4,074', 4,138'-4,314' 2-7/8", 6.4#, N-80 Brown Dual Hyd. @ 4,284'; 5,111', 4,997' ~ueverticaldepth 52' 930' 4,767' RECEIVED NOV o -6 t98 Alaska 0il & Gas Cons, Commi: ' Anchorag'-~ Baker "D" @ 4~590 ~ 13. Attachments Description summary of proposal __ Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 11/07/89 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas ~ Suspended Service 17. I hereby~¢~i~ that th~f~ is true and correct to the best of my knowledge. Signed Rb~/~~;~~D.' Ro~er~; Title Environmental Engineer FOR COMMISSION USE ONLY Date 11/06/89 Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test ~ Location clearance Mechanical Integrity Test __ Subsequent form required 10- ~/"/ .,-d GoP¥ fO'~ d Original Signed By Approved by order of the Commission ;2 a vi d W. Jo hnston ~Commissioner I Approval No. Date sion Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE · /"'~ Memorandum UNOCAL KU 43-7 Reperforating procedure: 1. RU wireline unit 2. Pressure test lubricator and BOP 3. RIH 4. Tie-in 5. Reperforate following intervals: 4691'-4712' 4766'-4845' 4902'-4950' 6. POOH 7. Rig down FORM 1-0C03 (REV. 8-85) PRINTED IN U.S.A. -.. · · STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Pedorate __ Other __ 1. Operations performed: 2. Name of Operator llninn (3~1 3, Address P.O. Box Operation shutdown Stimulate __ Plugging __ pUll tubing __ Alter casing __ Repair well __ 5. Type of Well: Development ~ ~nmpnnv nF' ~nl (fnt"n(n /,IINT(3 AL) Exploratory__ " / Stratigraphic ~ 190247, Anch, Ak., 99519-02~7 Service__ 6. Datum elevation (DF or KB) 78' GR Z UnitorPropertyname Kenai Unit feet 4. Location of well at surface 404' S & 423' E At top of productive interval 2526' S & 4218' At effective depth from NW cor., Sec. 7, T4N, RllW, S.M. E from NW cor., Sec. 7, T4N, RllW, S.M. ~totaldepth 3333' s & 4178' E from NW cor., Sec. 7, T4N, RllW, S.M. 8. Wellnumber 43-7L 9. Permit number/approval number 65-11/9-818 10. APl number 50-- 11. Fi(~Jd/PoQI ~ena~ Gas Field 12. Present well condition summary Total depth: measured true vertical 5707' feet Plugs (measured) 47 88' feet Effective depth: measured true vertical 4997' feet 4193' feet Junk (measured) None Casing Length Structural Conductor Surface 5 2 ' 956 ' Intermediate Production 5687 ' Liner Perforation depth: measured true vertical Size Cemented Measured depth 20" Driven 52' 10-3/4" ll00sxs 956' 7-5/8" 5755xs 5687' See attached ~bing(size. grade, andmeasureddepth) Long String: 2-7/8", 6.4#, N-80 to 1. Brown Husky dual hyd. pkr-4284' Pac~rsandSSSV(typeandmeasureddepth~. Baker model D pkr-4590' MD True vertical depth 52' 926' 4766' 4603' MD MD 13. Stimulation or cement squeeze summary Intervalstreated(measured) See Attached History Treatment description including volumes used and final pressure OCT 1 9 ]989 Alaska .Oil.& Gas Cons..C0mm/ssl0rl ' ; ~nch0rage ~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 3,200 0 0 0 1,300 0 0 ~bingPressure +360 +360 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations -x-- 16. Status of well classification as: Oil __ Gas _z_ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404Rev06/15/88 Roy D. Roberts Date 10/18/89 SUBMIT IN DUPLICATE LEASE KENAI DEEP UNIT UNOCAL DRILLING RECORD ALASKA REGION PAGE NO. 1 of WELL NO. KU 43-7L FIELD KENAI UNIT DATE E.T.D. DETAILS OF OPERATION, DESCRIPTIONS & RESULTS 10/04/89 4997' ETD DPM 4971' ETD CTM MIRU coiled tubing and nitrogen equipment. Test BOPE to 2500 psi-OK. RIH with 1-1/4" and 1.70" wash nozzle while pumping 3% KCL foam and N2. Tagged bridge at 4790' CTM. Could not work thru bridge. Tried slugging with 6 bbls 3% KCL water-no success. Tripped for 1-3/4" mud motor and 2" flat bottomed mill. No sign of bridge at 4790' while RIH. (Assume wash nozzle hung up in perfed casing at 4790' CTM). Cont. RIH to fill at 4869' CTM. Cleaned out fill to retainer at 4971' CTM (4997' DPM) using 3% KCL foam and N2. Switch to straight N~ and POH. Well not flowing gas. RIH with 1-1/4" coiled tubing with 1.7" wash nozzle blowing well dry with N2 to tubing tail at 4603' DPM. Circ with N~. RIH to 4870' CTM and pulled back to 4594' CTM while circ with N~. Shut down N2. Well flowing gas. POH with coiled tubing. Rigged down and released all equipment at 2400 hrs. " STATE OF ALASKA · 16: I/V/I l ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ X Change approved program __ Pull tubing __ Variance __ Perforate __ Other __ 2. Name of Operator 15. Type of Well: 6. Datum elevation (DF or KB) Development ~ ' GR. Union Oil Company of California (UNOCAL) 78 Exploratory __ 3. Ad~'~ Box 190247, Anch, Ak., 99519-024~-- Stratigraphic __ 7. U_nit or P. rop. ertyname · · Service__ ztena~, un:L'c / · 4. Location of well at surface 404' S & 423' E At top of productive interval 2526' S & 4218' At effective depth At total depth 3333' S & 4178' from NW cor., Sec. 7, T4N, RllW, S.M. E from NW cor., Sec. 7, T4N, RllW, S.M. E from NW cor., Sec. 7, T4N, RllW, S.M. 8. Well number 43-'7T. 9. Permit number 65-11 10. APl number 50-- 11. Field/Pool Kenai Gas Field feet 12. Present well condition summary Total depth: measured true vertical 5 ? 07' feet Plugs (measured) 4 ? 88 ' feet Effective depth: measured 4997 · feet true vertical 4193 ' feet Junk(measured)Top of fill at 4883' MD Casing Length Size Structural Conductor Sudace 52 · 20" Intermediate 956 · 10- 3 / 4" Production Liner 5687' 7-5/8" Perforation depth: measured true vertical See attached Cemented Measureddepth ~uevedicaldepth Driven 52' 52' ll00sxs 956' 926' s 141,989 Anch0mge 6.4d, ~-80 ~o 4603' HD hyd. ~:-4284' HD mode]. D ~:-4590' HD ~bing(size, grade, and measumddepth) Long String: 2-7/8", 1. Brown Husky dual Pac~rsandSSSV~ypeandmeasureddept~. Baker 13. Attachments Description summary of proposal ~ Detailed operations program __ BOP sketch Z_._ 14. Estimated date for commencing operation After Sept, 20th 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas .X, Suspended __ Service 17. I herebY certify that the foregoing is true and Correct to the best of my knowledge. Signed, cC~r.~.,,,,~Z/.~'~ (~.~ Title Environmental Engineer /-"Pn~/ 13 '" l~nh,:,wfq M FOR COMMISSION USE ONLY Conditions of a~proval: No-tiiy-Co~mmission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required lO- Retu - ORIGINAL SIGNED BY Approved by order of the Commission Commissioner LO.r'!.~!!E C. Form 10-403 Rev 06/15/88 Date ~,~/,,/~/~ I Approval No. ~,_,~/~ SUBMIT IN TRIPLICATE KU 43-7 PERFORATIONS: 4370'-4400' 30' 4446'-4480' 34' 4362'-4364' 2' 4486'-4488' 2' 4691'-4712' 21' 4766'-4790' 24' 4800'-4841' 41' 4902'-4924' 22' 4928'-4950' 22' 5038'-5088' 50' 5035'-5075' 40' 5071'-5081' 10' 5130'-5132' 2' 4 HPF 4-3/8" HPF Ail depths measured. Note' Anticipated static bottom hole pressure' A-10 sd S.S. A-ii sd S.S. Sqz ' d Sqz ' d B-3 sd L.S. B-4 sd L. S. B-4 sd L. S. B-4 sd L. S. B-4 sd L. S. Sqz ' d Sqz ' d Sqz ' d Sqz ' d 530 psi. KU 43-7 PROCEDURE · · · · · · e MIRU Coiled tubing unit (1-1/4")· Test BOPE to 5000 psi. Run coiled tubing to long string tubing tail at 4603' MD. L S =2-7/8" 6 4~ N-80 buttress · · f · f · Circ. and RIH to top of fill at ± 4883'. Circulate out fill using water and nitrogen as necessary· ETD is at 4997'. Circ until returns are clean· (A small mud motor may he necessary to assist in breaking up the fill). Make a wiper trip to the tubing tail· Check for additional fill· Clean out same as necessary· Rig down coiled tubing equipment· Return well to production. RECEIVED 141989 ~t~.~ka OL & Gao Cons. Commissio.~. Anchorage WELL 43-7 W.O. I II III IV CA I. II. III. IV. V. VI. VII. VIII. IX. X. SING & ABANDONMENT DETAIL Kelly Bushing to Tubing Head 12.50' Landed Above Ground Level 0.0' Cameron Dual Split Tubing Hanger at 3.00' 20', 78.6~, Drive Pipe at 52'4. 10-3/4', 32.754., H-40 Casing at 956' Cement Retainer at 4,997' Cement Retainer at 5,111' Top of Cement at 5,300~ cement Retainer at 5,315' Cement Plug at 5,620' 7-5/8', 26.4'~, J-55 Casing at 5,687' A-lO SD. ~ A-11 SD. LONG 1. 2. 3. 4. 5. 6. 7. 8. 9. SHORT TUBING DETAIL, STRING: 2-7/8", 6,4~, N-80 TUBING Otis 'XO' Sleeve at 4,247.69' Brown Husky Dual Hyd. Packer at 4,284.02' Blast Joints From 4,354.55' to 4,484.39" Otis 'XO' Sleeve at 4,546.11' Locator Sub at 4,578.88' Baker Seal Assembly From 4,580.00' to 4,591.40' Baker Model 'D" Packer Set W/WL at 4,590.00' Otis 'N' Nipple at 4,601.55' Botttom of Mule Shoe at 4,603.26' STRING: 2-778", 6.4~, N-80 and 2-3?8", 4.6-~, N-80 TUBING A. 2-7/8' x 2-3/8' x-over at 4,216.91' B. Otis 'XO' Sleeve at 4,218.28' C. Brown Husky Dual Hyd. Packer at 4,282.52' D. Botom of 'N" Nipple at 4,303.20' B-3 Sd. ? =S~~ B4 Sd. ::::S-q:~'d:-? VI B-.5, Sd. Sqz d. ¥1l 4997' etd DATE 6/28/75 7/1/75 7/2/75 7/3/75, 7/5/75 PERFORATI IN TER VA L 5,038'-5,088' 5,130'-5,132' 5,071'-5,081' 5,035'-5,075' 5,038'-5,088' 4,486'-4,488' 4,362'-4,364' 4,446'-4,480' 4.,370'-4,400' /~LL. /5-5 ON RECORD CONDITION B-5 Sd. Sclz'd WSO B-5 Sd. Sqz'd WSO B-5 Sd. Test (Bottom) B-5 Sd. P-r-cduct!c.". B-5 Sd..Sqz'd WSO B-3 & B-4 Sd. Sqz'd WSO Squeezed A-11 Sd. Production A-10 Sd. Production _ REV. j WELL KU 43-7 W.O. WELL SCHEMATIC UNION OIL COMPANY OF CALIFORNIA ANCHORAG£, &LASKA DRAWN B.A. W_. CKD. APP'D. SCALE NONE D~'rE 4,1--3186 {ECEiVED [ P ! a ].989 & 6as Cons. Commtss[(~i. Anchorage ,(7(~72-2 '1 Quad Blowout Preventer · Specifically designed for coil tubing operations. · Materials to NACE MR-01-75 specifications. · Rams are 17-4 stainless for ionq life. · Replaceable slip inserts. · Hydraulically actuated rams with non-rising manual locks and ram position indicators. · Vented to prevent well fluids from entering hydraulics. · Integral equalizing valves~no exterior piping. · Solid block body with no joints or welds. · 5,000 or 10,000 psi working pressure. · Also available as single, dual, triple or more, with spacing and side flanges as required. · Alloy steel with coating or stainless body. · Flanged or various union connections. · Adapter flanges/union available to fit all well heads. Tubing Stripper/ Packer · Effective packoff on coil tubing whether stripping into or out of hole. · 5,000 and ]0,000 psi working pressure models available. · NACE MR-01-75 specification for H;S service. · Double~acting hydraulic pressure assists operator in removal and installation of packers. · Vented to prevent well fluids from contaminating hydraulics. RECEIVED sip ! 1989 Gas 6OHS. t~ommissio;, Artchorage I Ii. . UNIT 1058 R®l)lloe8 1024 '~ TUBING' STRIPPER/PAC~~R TEXAS o psi Working Pressure ~ (~) ~ ~= H.S Service L__J TOOLS 1.00'Series DS322 1.25PSerles DS323 OCT. 84 ~ ' Ar~chorage ~ ~ ~.=j P Telex: 790905 TX TOOLS HOU phone: (713} $206 STATE OF ALASKA C .. AND GAS CONSERVATION CO/V~VUI'I'EE GAS WELL OPEN FLOW POTENTIAL TEST REPORT' ~IultI.POIXT T~-ST Test Init ial r"'l Annual O special Field I Reservoir Kenai Gas Field , Pool 3 Operator I Lease Union Oil Company of California A-028142 count, IL°~'~'i''n 404' S & 4231' E from NW Co'rner, Kenai ~ Sec. 7, T4N, RllW,-S.M. ..... t ' C~O. ~ Temptrat~re Tcmpera:u~ ~ 93 'F 61 'r 7 5/8" 26.4 6. 969 2 '7/8 6.50 2 7/8 2. 441 4303' · Test Date 8-05-75. :,~.~:, ,.. " i %Veil. Xo;' · KO 43-7S .7-3-65 4~88TVD 64' h~00~-4480' Set ~ MD 5687 Len~ (L) Ratio M[F ~er Bbl, Liquid Api~ :Pipeline Connection t Type Taps Nikiski I Flange ~,lultlple Completion (,Dual or Triple) 'I Type production from each zone Dual I Gas OBSERVED DATA Flow Dafa Time ti (Prover) I (Choke) -of Flow ~ fLine) (Orifice) Hours Size Size 1 I 3.826 i 2.500 s.826 ! 2.~00 3.826 i 2.500 2. 500 t Press. I Dirt. Tubing { h Press. psig I w psig ,t 10.97 I !29! :, ' 20.57 i {234 3.826 { { 35.14 I 1156 FLO%V CALCL'LATIONS ! 1~7,3 4.00 1337 Casing Press. psig Flowin~ Temp. 'F 65° 65,° 65° 65° Coeffi- J ~ cient h p (24 Hr.) . w m ~ 34 147 i 73. 539 : - 34.147 i 119.695 _ _ 34. 147 I 160.287 34. 147 I 202.8~2 i Flow Temp. i ' Gravity Pressure Factor t Factor psfa F F 1352 1 0..9952 1306 { 0.9952 1249 117.1 O. 9952 0.9952 CALCUL.&TIONS Compress. Factor Rate of Flow pv ; Q 3ICF D 1.3423 { 1,.,107,1 ! 3713 1.3423~ 'i 1' i038 .... ~ ..... 6027 1.3423 .-.I 1.o9~)7 ! 8o41 1.3423 , ,.].,, 1.0936 I 1011~,, Potential n ',2 ! ~ 300 .~,cr',~ · 5869 '~CERTIFICATE: I. the undersigned, state that I nm the engineer of the Ur ion 0 } ]., Company and that I am-authorized by said company to make this report; and that this report was pre- · >pared under my supervision and direclaon and that the fac~a stated therein are true. correct and complete to ~'~/ / // ~_, , ..... $1~-te . ~t~ary E. Car 1 son GAS~'~LL OPEN FLOW POTENTIAL TEST RF?"RT PRESSURE CALCULATIONS .(Supplement to AlaSka'O & GCC Form No. G-I) Field Kenai Gas Field Operator Union Oil Company of California Reservot. r Pool Lease A-028142 Tesl Date 8-05-75 ~,','e i t ~0. KU 43-7S Test (I) (2) (3) (4) Ps pf (ps2_ pr2) No. ~sia ~$i~ X 104 ?..'CF/D , ,. - : ·. · .' ,,~ ~ .... .. . ,,, · ,., J ,,..~: ,, .., .... 1 1387 .. 1~5Z .. q.gq R713 , - 2 1388 ..... 1306 22.0~ 6027 3 1388 1249 36.65 8041 4 1,388 1171 55.53 10119 . Sub-Surface Test Data Subsurface pressuFes measured. Subsurface pressures computed- Cullender-Smith :..~ethoo of !0CC. (I) (2) (3) (4) Test Pws 0 ' (Pws2-pw~f2) g No. ~s i a ps i a ,'< ! 0- 4 ,.~=/~.. ~,., ,~ , ~..~_... .... ~ ; .... , ..,,_ , ,. ~ ,- _ _ ...... · ........ - ~'~Nomenc I ature: ~s = Static surface pressure ~Pf~= Flowing surface pressure -Pws ='Static bottom-hole pressure (mid-point of per(orations) Pwf = Flowing bottom-hole pressure (mid-point of perforations) Q = Flow rate, MCF per day at 60~F and 14.65 psia 1-70 · Back Pr.~-~ure Tests Well: ~43-7S Pool: 3 Survey Date: 8-5-75 1.0 _ .-'. : _t.. ' ; .......... i.l...ll ...... " ,,; ..........'.:...,, :. ,,~., ,...-: ..... : : I :'" ''''iIi'','12'1:", :;;ifil: :"ii il:~ 11'; - _,_ _L, : ..'.: : ~., i ....:.,:,ii:'::: ",,' :: : :::: ':" ::::k::: ::-:: ~ ~.: ';;~.: ~-:~vL:.i:-: :'i'~i;. :ii- iii::"::'ii-ii;i, :':!!!1'.:, - i .....,---; , ~! .~+ ..... ~,.~: ~,./-'~.~;~. , ...... , '~" ' .................... ~'' ' T : .. - ! ' : ~: '' '''~ "I ''~.' { ' ' '( '~ J'"' ": "~" ~-"~'--+" Li'*' ::_i': .... : ':-': ..... ii' '; ~ .~ '~ :': .... .: !..iL~ ilia::':' ..;: 4'~ : :~L¥.l.i_~ j'.";l::: ; :::':;;i :~: ;:.;: .,.I),. ,., ..... .'" '~ ~:~ t~L" LT:~ ""iil '" -~-~ --. ~-~ 4,....~ .... ~---' ..... , .~, ..... .~ : --,.--. ..- , . ,.~, ~ ..., .: ......... ::., ;,. l~. ; ......... , -,~- ~, ~ --- (_~. .4j_!.(:l;!. ,.,: : , .: .['':~.' - ~. ..... +~,~.-t ........ , ............... F ..... ,' .', ' '~ ~ ' , ' - ,: . .. ~ . : ' ' ' '' , ' ':.::.:.: .... '.-:': .--:--:.i ..... : .....:.-: .-. Z-. ::_::ii '';;:ii:: .:.::.:::hi::.::':-:::,:: i ii:: 'Iii' -~-.:-,:I~' -;,-':+~- '~'t:-? ....... :l'i' i; ' '~"' i'"~'l' ;:: "': ~I'~' ;;: ..... +~ ~-~,~::.~'~ I.~m., +~- ; ,l~ ..... i; ,~1:. + , ,. ,r. ,,,: .... : .,~, ~.~ - ~.:.t ......................... t ................... il,-, .! II, · . :, ~1 ................ I ..... -- ~-L+i:U-~: i~- '~i: .......... ;i'''~':'~ .... !..':~;:,. ),,. ,:.. ...... Im ,_~g ..... -J-.-~-~:i~q:4~-~:~** ....~:!~ ...... ,;-,., ~-:; h, .,:-'[,,: .,~:-~. ~:-, ~-~-h [~I,-, ,.-- . ~LT~,-!~i-{IJ¢ .~L~_i~, .... :.~.L.~;:.:,::i.. :.!.1 ~-:,..i:~:: ..... :..- i~T- y'!-: ...... :? ~'-'-:"~ ..... ~ "' ~''~ '': ....... ;"F" :'~;' ':'' ":'['- ' .:. : ..... ~ .!.i.l:.. . 'ii : ...... :.:- :..,-..:. ' ....... ~,! : : ': :i ;':-: /::::['::: :'-: -;-: i- : ;- il:-;::::: :::::::::1:::ii:.: :ii::;:::'.;-:1"i".' :':.; u :-:.:.: ::~": ~-.'~; :::: ":LtTl::i-f-L'[n-i l':rl;:~.: ::-:.t=:~l :t:~,;; :::: ;:;.; i;:; ';:, .::: ::::I :-:/!-:---:-m;:'~ !!!-~].~J::'_-l~'t:-l'!.;t.'.'It: ::;:::: !.,i'[': '.:::::::I'I':: .::; '?. !:::': '::,:: ~_,._.i-i-.~.:-:-._--t~.~ '-=ii':' ..... .',.t~:.:'~i -~:~ :,t~l[,:~ .... ~ ~-:~l,h~:::!.. .... +-'-,-I,, 'dl 'I' 't '-'; ":Li~: "i! ti : :J:~_::-L · _ -~-~'-';:- i :.~::, -~,; ....... ~::' ~ ......... ~': ~. ...... ~' '~ ..... - -' .-~ ~-' [i-.~ 'i ".'::.],'": .,,~:' i'J" Iii ,+ - '-'--~ --'4L :_~.'~:'-.:--_~ ....... t '" ....~ ................. ' ', t 't ' ' , , · _Ll .... i i 'i' , ~: I ....:~'" ~j ~p.: ~ ~,~L~ I~.!:, L-d-~ -~--L~" ~4J -~;~_1 !.J~-I:.i~HJ!4~-:-P ~-~-lil~--l-L.i- ~-;! ,~-; ..... ~..iL, ?~'~--;T ~.'~-'f ' 7" .10 ..,,,,:ii,,.,: ,.t,:.! i.._.t... _ _.: . ,l,,,,.....,. ............................ - _ ...., . , ~ ............: .......... : ................ ~ ~ ......................... ....... ii_[: .... ..... !-i ' ::_ :' iii' ;.:; :.,'i7! iiJl !:.-.i.iii'!i ;ii::iii' ;!i'i¥ i!i: .ii' .! ............... _"~.'L: ...... . ................ :~ ..... ~ ...... i'' .[. ............................... ::- .......... ,.: .......... .'- ~-'-: .......... : ...... ......... ~-,-~ ~- ........ ,-? ........... , .... ,: . ;,'-;Ii -.~-[ .... F-i-., :_: :.,- ..... :.: ~-=.-.-: :.: . .... !.. ..................................................I.. -.-~t ..--~, -t r~,,'--~':-~':~-?~ ": ;':'L' -~'":~: '/.'; [:.: : :;:L~ ~..._ I~--: Lt. -~ ..... u, ~ ..... :--~-,-,-~ -~-i-+= e ~ ,-,t.-~---~ ~--:--! .'-~ ......... ~ ............. , ..... L' .' -_.~..:._:~.! i ~ !: ...... :.. ::.: ..... t~!I,'-:-: :: .:.~;.::.: :::.:ii: ::: :..: ::-;: .::: ::':]::::'.:-:: :-::::] ::.::::-. : ::':::l;~;:~i!! i-{ii ii.! J_~'.'-'Ti'-i :7 'I-; ii'';::'' .:':-:iL: :;.:' : . . . [ - . ............... t:~'.-t :::'_::.. :~:. ; -~ : : ' "~ :ii-;.':'::' '.':.i-".:.[:.-: ............. I ": .......... -,..i ...... i ................................. : -" :.*' ,, ] ........ . ..... · ~- ~- ......... ".~ : ': - '-: ........ : ' '::" ......i '~ .::: ?i~::'Z :iL: ii.; T- i ;-:~-';': :-: ; : il-'-:-'::.''J.'';'-' ;:::: :-:: ::"::;::; '' ''2:' Ti'' '.'"~' 'ti.: ;. ...Li.' .Li.:-i .:";;. :'.2 ,-¢-.~- ..... :-,., ..... ::..: ...... I/--,.,-. ........... :-'":: :'::i:'"::':::::ii: ....... : ......... ~:: , ;'. t.-: ...: .,,..- ..,: : :- :1:-::~:~:.: :.' :~.:!:!:::?::i-:.~t~!;;':~ :l::.;~::'~i~::~;~i: !'.:'~ .i:~..~': ~i:, hi: ~::: :..'-:,::: :-.:: "-'-i~::'-'!': ::-::-:i!"i'"'::i" .... ::i'i.:,. '..:!ii i ii:!~ !:::'!:!iFil i!!' i:'i i"'~ ,'. _ '-:-:'-* ~_i ',- ' '~": . l'::.'/:,l:!:}~u! ,'t :.;: "~: :it' -.|.: -::- '. : : .':::,'...-:.:'.-:'-r':.::':':t':~:':,.:, ::~'::: :~ .. .... :.; ..... , ..;; ..... ~,~. -._ - ' "'? ...... i ' · · , , ' - ' ',. ." ..... ; .... ~.I.,. , ......... '-.-t ..... ~ ~,~ .... .--:..-t - ./-.:-t-:..iu- ,:.~ '- 'L-T:.::: ::::I::':":-:;:':" ::; ' :'::'"' ::;:': U.::~::'::.;-t';:: :~: L'~-~-;: :;4'::.:: .... , ; .... : .... ............... :"l-: ...... :: ii:: :::. : ~ ~I'~"7:~''~ 'qT[t't:i:'-' ;' .""-! ;!.i.'I i-i-. ~:'. -.: ................. ::. ~! ...... : -~ .... ~--~-i ...... it-'- ................ "'~ ..... I .... ; -' :~ -:~-' :- ~- ~ ..... ,, . .T ' ; ...... ' ".. ~ '' - '''I ' ' ' '. ........ ' :,' .,j..; ,, :.. , ........... '., ~-i .... ..L ~",'i ........ ~ ~-. 4.~---t. .-, * ~.-~ , -- .,1. lall ...... ~ ~.- ,'-i-~,-~:~! -t-~o-~ :- -:+, *: ,- :-~-:-'f' ',t ,- : : , . . . ~ ~ , , , ...~.~ :...~ ......... :,.,~, ~..~.. ;.~..,.~.~....,., -!-+-~--~-~ .... l:-~-,.~i-~-/. ...... t' ":;~ :~"'i ~' i-", :"] ....I'-' :T'~' .... : ... .... ~.-.+--i-j-:-n,.:-.-~ .. t [ :: ,_~. J,. ......... :I ........ I--~' '-~ ' :~' '["~:~-:'7 .... : .... I':'':~'' i ! .... : ......... |~.- :-:~ ...... t ..........t - ......... ~ ...... , ' - . :. :... ~.'.::..'./-.: .... ~ ....... : :. :.i.i::::~.::.t~.. :_~:._:!::! :...i!.: ::. · - :.::-: ;.~ -: !!,:-:l:.Li-'-:.i~:-;L: ii..:: _~-:::-_~---~;~i:.'~:~.:t.:.-ri-i'-:~.~ ~i~-.:i~'!i!:~::~'~:! :'!--: ii:: :i~! ,~!~ ~':--.-I~!: 5:::.--'::;,.::- ::: ::: ::: ':-. ! "~::'::::=: :-F'.i'~!::l:::! ~":: - '~...L'~:.: ...... ~...' ..... :,'. ..... ~: ...... : ............? ......................... I : : ...... F'-:'',;:;; -:: ~': :;:: : '-~:; ~':$~"~, i'.:; ::.: ',:. i:.:, .: ....... : .... t ..... .l~l ........ ~., . .~_;:,',:..~,i~'~,~. '""~'i ...... : ~~ ...... ~ · ~I .... ' ~-~ Li---+~,-. -r;-.~,..~; :::.: : · :: :;. ; -:: .,:, .~; t.~: :;.u : ':;:;:: ~:': :, :r ::-::;-.,-:-. i-[.: I,-.-.~i- ............... ~, .... ~rtl :;: ..:; Ii::: ,:!;]:::: :: :; r~-J~- --:~' · II.,i ' .......................................... "'r''. '"~ ........... ": ...... : .......... ' .......* ...... L'~-. -!-': ~$' C-_ -~:,::-'~"~' 'Fi,IX.!' -, ......................... ,.- -~ ......... t:~.- [ ....... ~ ....... ~ '~ II ........ ~ ............... "il ....... .. . ' ........... ''* "-""~-"~-~' ~ ...... i': .......... ;'"~'''~' ' '' ! ~'.. .. ~, .... _ ......... ~_ , .+...~ .......... ,, ........ ',,4-: ....... :1~,.~] .................... ::-; ::--. -t--z ...... : ...... t'~-tt*-l*'~,' ;:-~; .... ~I";:~' I:L"'.I L.~::,. - - ' -j:- -~ ......... , ,,,, r'- ' -~ ..... ~ ~ ~-'~ ........ ~ .... ' ..... ~ [~'~ _-~:..'~_, "_:-;_-:' r ~.~;-il. ~-~,,~ ....... ,,; .,~,.~ ~t ........... i- ' 21~; .... ..~:,,~ ...... ~.-~-~!,~ i~ ;~',. ,.;,'1.~:-~,;-.. ...~. ,~:. ~.; :~it" :_:._;_~.i-q~.~.~-4-+i.J,., ~.,-, l~-.~ ,.. ~;h-;~ . ,'--~ ~t~,,~ ........... ~-,' .._..,..,_: ..... , .~, ~ , .:.~_ ~: .;, , :i~: :. :~t: .... ~._1,:~. il~ ~.;+ ,,.. :~.. _;.:_~_+_z ,,-~,i~, ~ .h,;,.,,- ,~:~' ..... ~'.~ ~.~ ~..: ....+',;' ~-~ .... :", ',;' .... +j.,H_JL~fI · .... ~:i' ';!:' ::' "" ,'1'*,'1' "'"i "" t' ': .... ~'i '" ....... '.~ "hi' .' ' ' . ~ ~... '.I.L ' 4.' +i. ,,:.',,,L: :.:;:.i.-. ' ' , ~'-J ',1 .~:' '--;; ..... l .... -?" 'l .... : ...... . ' , ,, t' ~T ~- · : t . ,, F .... ,01 +ri-: :~' U ~-: ,-*~-!-ti~:- ~,:--~-,~:::::' -'~",,, ...... : m :' , ' ~ ~" 'J+'; m; . .,,..' t .... :.,.: :~ <.,.'::' ,;.; ~.. ~.~!.'_,,, ,.. ~:~:.;,. .. , :,~: ,.~::I,~ ..',~ ~::, Iht, :. l,,: 1..0 2 5 10 20 10(3 CAS FLO~ I~TE STATE OF ALASKA' AND GAS CONSERVATION COMMITTEt: GAS WELL OPEN FLOW POTENTIAL TEST REPORT MultI-POIXT T~ST Test '~nltlal r'l Annua! r-I speda! Field I Reservoir Kenai Gas Field Pool 5.1 Operator Union Oil Company of California ILease A-028142 county ILo~ati''n 404' S & 4231' E from NW Corner, Kenai !Sec. 7, T4N, RllW, S.M. Test Date 7-15-75 %Veil No. KU 43-7L · 7-3-65.' . 4'784 TVD 128 156 I Set @ TVD 5687 Avg. Prod. GL { Oa<-Liq,id H)dr.~arbcn { Gr3;i::.' Of Length (L) ] Ratio .',IFF pet Bbl. { Liquid ,Apl) , · Pipeline Connection { Type Taps Nikiski I Flange Multiple Completion (Dual or Triple) { Type production from each zone Dual J Gas OBSERVED DATA Flow Da~a Time [ (Prover) { (Choke) Press. Diff. Tubing { Casing [ Flowin~ NO. of Flow { (Line) (Orifice) h Press. Press. I Temp. Hours Size Size psig w pslg [ psig 'F ,, I I I 1: 85 i ; ,. ~ 1 i '13.826 2. 500 1' . ! 2.2.5... 1'.' !349. j { 6.,2° , , , 62° ~. 1 ! 3.826 2. 500 ' 3.52 1333 , s. 1 i 3.826 2.500 9.12 ' '1276 { 61© ~.~ . I I 3.826 2.500 17.87 . 1126.. { . 60© FLOVC CALCULATIONS cient h p (24 Hr.) , w m Pressure psla 34.14.7. 34. 147 { 108. 508 34.147 { 142.792 Flow Temp. { ' Gravity FactorFt { Factor Fg Compress. Factor Rate of Flow F : Q MCF.,D pv { 34. 147 I 55..399 1364 0.9981 i 1.3423 2537 i 68.884 t t348 1291 0.9981 1.3423 0.9990 J 1.3423 , 1.OO00 { 1.3423 1.0011 t '. !.1099 .....! 3498 1141 1.1066 I 5498 1.0955 i 7170 PRESSt'RE CALCULATION! P P w Cal. w -- (psla) P: F.Q iF Q)~ P: -- P~ ' -t c c (F Q): X l-e-~ P' P .... P c w e w w P t c Ahs.,lute Potential { n 20,600 .~,cr,,n{ .6866 ,,, CERTIFICATE: I. the undersigned, state that I am th,. en_q {neer of the iUn ion 0 j l~, Company (company), and that I am author'~ed by said company to make this report; and that this report was pre. pared under my supervision and direction and that the facts statedJherein are true. correct and complete to ~ ,, Signature Garry E. Carlson GAS~_LL OPEN FLOW POTENTIAL TEST R~"%RT PRESSURE CALCULATIONS (Supplement to A laska'O & GCC Form No. G-I) Field Reservol. r 7T .elsS~ 7D5~ t o Kenai Gas Field Pool 5.1 - - _ Operat~)r Lea~e i'.¥-il 'I~. Union Oil C,.o. mpany of California A-028142 ., . KU 43-7L _ (I) (2) (3) (4) Test Ps pf (ps2_ pr2) 0 No. ~sia ~$ia X I04 ,,,~F/D , ,. .... ,, 1 1399 1364 9.67 2537 , ,. · 2 1400 , 1348 L14.29., 3498 3 1400 1291 ,29.33 . 5498 , , 4 ..... 1400 1141 65.81 ~ 7170 Sub-Surface Test Data Subsurface pressuPes measured. Subsurface pressures computed Cullender-Smith ;..qethod of !'m~ " ¢'i> (2) i'4> Test Pws 0 · (Pws2_pw~f 2 ) Q No. ,. , , ....... __ .,, ,, _ Nomenc ! atu re · Ps = Static surface pressure '~f~= Flowing surface pressure Pws ='Static bottom-hole pressure (mid-point of perforations) Pwf = Flowing bottom-hole pressure (mid-point of perforations) Q = Flow rate, MCF per day at 60~F and 14.65 psia 1-70 Kenai Ga~?ield Back Pr( are Tests Well: KO 43-7L Pool: 5.1 Survey Date: 8-5-75 1.0 ,.3 ~' '. 02 · . O1 1..O 2 5 l0 20 50 100 GAS FLOW RATE Dear Mr, Marshall: Union Oil and Ga,~vision: Western Region Union Oil Compar:: ~f California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 279-7681 ............ union October 22, 1975 Mr, Tom Marshall Division of Oil & Gas State of Alaska 3001 porcupine Drive Anchorage, Alaska ...... c. f:,i,e--l .......... i" tlr%"'"I ...... ...... 2 "F. Ix!G-' ..... ?C. SOL t ........ ~, Cs-'~:OL 1 ......... I~.'~_v ...... I'-' ........... f.,~,Fm "-I .... .......... ~.-'C .... T-- .. C...C:~'!F~R: '¥'ItE.. 99504 Enclosed for your files are two (2) copies each of the Well Histories for the following wells: Trading Bay Unit State G-15 (WO) Trading Bay Unit State G-13 (WO) T.rading Bay Unit State G-2 (WO) Trading Bay Unit State G-21 (WO) Trading Bay Unit State G-23 (WO) Trading Bay Unit State G'23 Trading Bay Unit State G-22 Trading Bay Unit State K-21 Kenai Untit #21-6 (WO) Kenai Unit~) Kenai Very truly yours, /, Jim R. Callender 5~C"' ' District Drlg, Supt, sk Encl. (22) ., cc: Marathon Oil Co. Atlantic Richfield Co. Amoco ProdUction Co. - TBU only Skelly Oil Co, - TBU only Phillips Oil Co, - TBU only Standard Oil Co. USGS - Rodney Smith FQrm 9-$30 (lie,,'. 5-63) UNITED STATES ' . (Seeotherln- DEPARTMENT OF THE iNTERIOR ~ s, ruetio.so. i reverse side) GEOLOGICAL SURVEY WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: ...... OIL b. TYPE OF COMPLE~ON: 1VELI, OVER EN BACK n~SVR. Other 2. NAME OF OPERATOR UNION OIL COMPANY OF CALIFORNIA :: : 3. ADDRESS OF OPERATOR P.'O. Box 6247, Anchorage, Alaska 99502 20. TOTAL DEPTH, MD & TVD [ 21. PLUO, BACK r.v., MD & TVD . [. 22. IF MULTIP~., [ 23. INTERVALS 24. PRODUCING INTERVAL(S), OF THIS COMPLETiON--TOP, BOTTOM~.NAME (M~.AND Po61 5.1 4691'-4950' (3959'-4t60'TVD) ~6. I[P~ ELECTRIC AND OT~ER LOG~ RUN Form approved. · .Budget Bureau No, 42--R355.5. LEASE. DESIGNATION. AND SERIAL ,. 028142 ' · . . NO. 6. IF INDIAN, ALLOTTEE OR TRIBE NAME ; . :7 . ::. :', - z ~::. ~ "' .. 7. UNIT AGREEMENT NAME - · . . , K~i lil, i, ! '= · . ., : / ~., . . 4o LOCATION OF WELL (Report location clearlll and in accordance with any Etate requirements) At.surface 404'S & 423'E from the NW corner. Section7:-T4N, RllB at:top prod. interval reported bdow 2526'S & 4218'E from the NW corner. ~ Section 7: T4N, RllW,~S.M. At ;.total dep~ 3333'S: & 4178'E from NW corner.~ ~4. Sedti0n 7: T4N, RllW, S. M,. l ..... 65=11 ] ~'/6/75 Kenai Borou=h"Alaaka L-FDC-GR Log from~ 5330'-3970' 2S. -: ' CASING RECORD (Report all strings set in well) 10, FIELD AND POOL~ OR WILDC&T , Kena} oas Fiela,:~'. : ' 11. SEC., T., a., M., oR BLOCK ~Np SURVEY Se~tibn .7: '~T4N, R-11W, S. M. ROTARY TOOLS ,. CABLE TO.0LS ~ ~[" ~5. WAS DIRECTIONAL · ~ ~ ¥ !i , SURVEY MADE . :: "~ .' ?' N<~ ":'" "'-' '~ 7 5/8" 26.4# 5687' ' -.. .-9 7/8" " : CEMENTING RECORD Dri'ven ' ','-:.' 575 .qx. cmt. : AMOUNT PULLED . . .. 29. LINER RECORD SIZE TOP (MD) None BOTTOM (MD) SACKS CEMENT$ 31, PERFORATION RECORD (Interval, size and number) , .' 4691'-4'712 ~x~ '.~-4370'-4400'i-i 4*' csg. 476 .~::.4790!-/ ............... [(:.4.4 4 6 '- --. 4480.1 _[_ guns~ @ 4800'-4841'I .... ~' 4 hpf. 4902'-4924' 4 3/8"· jefr holes per foot.- AO?~ I_ AO ~FI ~ 30. TUBING RECORD SCREEN (MD) SIZE [ DEPTH SET (MD) .PACKER SET (MD) .2. 7/8"LS~ 4590' _.. 2 7/8" " I 4282' .32. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH ~NTERVAL (MD) '- 5575-5600 . 53'52'-5496' ql~0'zS] 32' 5035'-5085' AMOUNT AND KIND OF MATERIAL USED 50 sx. Class ."G" cmt. d125 sx. Class "G" cmt. 118 .~-z' Cla.q.q "G" cml. 90 sx.. Clas~ "G" cmt, 33.* PRODUCTION DAT~ FIRST PRODUCTION [ PRODUCTION METHOD (Flowing, gas list, pumping~size and type o! pump) 7 / 9 / 7'5 ............. "-' :[ F-l°w~ng ..................... ' t WELL STATUS (Producing or ............................ . , shut-in) ~ : Producing 7/8/75 5 mins.ea.dtr. 1/2 TEST FERIOD [700--LS > ~' ~700-SS ' ' '. -. " FLOw. i'ussl~O PEI~S. ] CASING PRESSURE [ CALCULATEDNot ;rec. 24-HOUR. >aAX' [ ox~s.,. _ 3~MSPOSlTION OF OAS (8old, used [or[uel,.v~ted, etc.) ~ mmcf/d LS " ' ' [ ~s~ w~.ss~ .~ . , ., , Vented '~ · '-':' George Penney.. ' ~ ' -~. LIST OF ATTACHMENTS .-- ; - . ,,.~ : .. . I hereby certifyJhat the foregoing and attached information is complete and correct as determined from all available records · .i :,SIGNED L sst. Dr] Supt. ".'~'DATE '.; ~/1 75 ~ .~ . ~~ - /_-~--- ." ~ *(See Instructions and'Spaces [or Additional Data on Revere Side) ...... ' G n.ral. This form Is deslgn~ for submitting a ~mpJe~ and:co~ ~11' comple~t0, repo~ a~ ~og on ail.ty~j0~ la~s a~ l~s ~ et~ef a F~er,! age~ or ~.~ agencr,~ or both, pu~uant to applicable F~eral and/or State lSws and re~atlOns. Any'n~ssar~;Z~mI inst~c~on. ~ace~tng the ~e of this form and ~ n~be~ Of. co~i~ to ~, Submitted, particularly with regard to local, area, or re~onal pro~es and prac~t~, eit~.~ are shown beloW.O~ will be ~su~ by, or may ~ ob~i~e~ from~ t~e 1~1 Federal ~d/0r S~te offi~. See instructions on items 22 and 24, and ~, ~ow r~garding separate ~e~orts for separa~ ~pl~tons. ~ . ~ : ir not filed prior to the time this summary r~ord ~s submitt~, copi~ 0f all curren.tlF available log~ ~drlllers, ~l~lst% sample and core analysis, all type~ ~lectric~ e~c.), forma- tion and pressure tests, and directional surveys, should be at~ched h~reto, to the extent r~quir~ b~ applicable Federal and/or S~te laws and re~latl0hS. All attachments should be listed on this form, see item 35. ~ ' - · . . . · .~ tfem 4: If there are no applicable State r~uiremen~, locations on ~eral or In~ian land Sho~td be descri~ In a~ordance with F~eral r~uiremen~ CoflSalt local S~te ~r F~eral office for specific instructions. · : ¥, ... , -.- ~ [fem 18: Indicate which elevation is used as reference (where not 0th~twl~ shown) for depth measuremen~ ~ven in other spaces on this form and ~ a~ attachment. ,: Items ~2 o~d 24: If this we~ is completed for separate production fro~more than one inte~al zone (multiple completion), s0 state in item 22, and in i~ 24 ~hoW [he ~roductng ~ interval, or intervals, top(s), bottom(s) and name(s) (ff any) f~ only the interval re~ ~ i~m ~.' Submit a ~parate repo~ (page) on th~ fot~, ad~aa[eiy Identified, tot each additional interval to be separately produced, showing the additional data pertinent to such interval. , ,' , j~ item 29: "~acks Cement": Attach~ supplemen~l re~rds for this well Shoed show the details of a~y multiple s~ge cementing and the 10~tiOn og the e~[iug ~oi ' '' ~' Item 33: Submit a ~parate completion re~rt on this form for each i~terval to be separa~.ly prodUe~. (S~ instruction for items 22 and 24 a~ve.) ' ",, . ' SUMMARY OF POROUS ZONES:, :,~' · .__ - ,' I -. : : SItOW ALL I~PO~TANT ~ q DEPTH ISTERVAL TESTED, CUSHION CSED, TIME TOOL OPE~, ~LOWISG . , !.'";:.i.:' i I, .'i ......: ..... I "-' '''~ - , .... ~ ...... ,I ; DE~CRIPTION, CONTENTS, ETC. "jw/~ 18 cushion e~s.-O'Psif :, I press-~ot ';'W/~ 1450- psi g.~ cu;s o '7:.8~ mmcf/d 'w/:1115 "s w 1 si:. press. : ....... ,_ -,, ,...,....., . · , , ... ..:, ........ .::.. '..-'.,,. .' ". ~ .-:t .... , .... ' ,"-,"- ,,- ;"~ -': nt & kindl of: :material: used i00' ' cias ....... . 75 ~x ~ lass {,G'--.c~t'; ':/' .: . . : . .,~ . ,Z" i ' ~ - i · ,: ~d T U.s. 6owms~£~? I~lm'l~ c~q~z: ~smF-o-~a6~ ....' · ., Form D- 1001:-A UNION ...~ ..-. ~.:.- , ! ~ · ~,.,- f Kenai Unit OIL CO. OF CALIFORNIA REPAIR RECORD SHEET A 0 : PAGE NO. LEASE FIELD Kenai Gas Fj_eJ_4 BEGAN: 6/14/75 COMPLETED: 7/8/75 PERMIT NO~h_-l] SERIAL NO. A-028142 ~ N" 'N"iVEERr* t~n~.ay & W_atson COM!A~ Y E] .~- ,, , ..~_ - .- .......... w ;~:~T~=~ CASING & TUBING RECORD WELL NO 43-7 WOCONTRgCTOR.. Kenai Drilling Co, ..R_~ #3 TYPE UNIT__ Oilwell 52T ._ ELEVATIONS: GROUND See CASING ttEAD Previous Reports TUBING HEAD ROTARY DRIVE BUSttlNG SIZE F ~: =2TH 20" r.2' 10 3/4" ~56' 7 5/8" ~ 5687' 2 7/8':L14402.64 2 7/8"St4251.56 WEIGHT 78.6# 32,75# 26,4# 6.4 6.4 GRADE H-40 J-55 N-80 N-80 REMARK~ Driven to 52' Cmt'd w/ 1100 sx. Ideal Construction cmt. Cmt'd w/ 575 sx. Ideal Construction cmt.-last 100 sx. w/ 2% CaC1- Tbg Dual. See pages #7 & #8 for Long & Short Tbg. Detail. PERFORATING RECORD ,. 7~ATI~ [ INTERVAL. IS.T.D, REASON PRESENT CONDITION __ 1/65 4691' -'4712' 5593' Production B-3 Sd. Open for production. 7/1/65 4766' - 4788' 5593' Production Upper B-4 Sd. Open for production. 7/1/65 4800' - 4841' 5593' Production Middle B-4 Sd. Open for production. 7/1/65 4902' - 4924' 5593' Production Lower B-4 Sd. Open for production. 7/1/65 4928' - 4950' 5593' Production Lower B-4 Sd, Open for production. 7/1/65 5352' - 5374' 5593' Production Upper C-1 Sd. Open for production. 7/1/65 5387' - 5428' 5593' Production Lower C-1 Sd. Open for production. 7/1/65 5431' - 5472' 5593' Production Lower C-1 Sd. Open for production. 7/1/65 5475' - 5496' 5593' Production Lower C-1 Sd. Open for production. 9/11/74! 5575' - 5600' 5620' Production C-2 Sd. Open for production. 9/15/741 4820' - 4840' 5620' Production Middle B-4 Sd. Open for production. 9/15/74 4770' - 4790' 5620' Production Upper B-4 Sd. Open for production. 9/18/74i 5585' - 5600' 5620' Production C-2 Sd. Open for production. iNiTiAL PRODUCiiON A,["'I'iI':R REPAih DATE I iNTE~.V~L, iHETOiL : CUT ~ GRA. V. C.P. ', 'F.P. CHOKE MCF . GOI, I REMA.K$ _ 7/20/75 Pool #3 -0- -0- -0- 9.37 M1V:GF 7/20/75 Pool 5.1 -0- -0- -0- 8.36 MI~CF WELL HISTORY PRIOR TO REPAIR COMPLETION DATE: 9/20/74 LAST COMPLETION NO. 3 :PRODIlCING [NTERVAL:~-! Sd B.4 Sd._. C-,-2 Sds____ ' INITIAL PRODUCTION: ~ LAST REGULAR PROD. & DATE:_Pr)ol 5_2_La9.5 MMCF l_(1/_Z4.. Pool 5. ] S,8_~9.3_MMF~~ 6/3_5~ CUMULATIVE PRODUCTION:_222LS~~~ Pool 5.1 S-~2,,25_3~L84_4 TOTAL REASON FOR REPAIR: Form D- 1001-1~ UNION OIL CO. OF CALIFORNIA REPAIR RECORD SHEET B PAGE NO LEASE Kenai Unit .__ 2OMPLETION DATE:. 1.7./8/75 .. DATEI 6/22/75 6122175 6/22/75 6/28/75 INTERVAL 5033'- 5088' 5938'- 5088' :,~,38' 5088' 5038'- 5088' 6/30/7_~ 5130'- 5132' 7/1/75 5130'- 5132' 7/1/75 7/2/75 7/3/75 7/3/75 7/3/75 7/5/75 7/5/75 5071' - 5081' 5035' - 5075' 5038' - 5088' 4486'- 4488' 4362'- 4364' 4446'- 4480' 4370'- 4400" .. FYPE: Cameron ETD REASON 5315' WSO 5315' WSO 5315' 5300' Production WSO 5300' WSO 5111' WSO 5111' 5111' 4998' Test Production WSO 4998' 4997' 4997' 4997' WSO WSO Production Production WELL NO.43-7 WQ FIELD. gon~ Can F~]d , APPROVED ............. J J,.l~. R,_Gallend.c_r (D~i. st, Drhl. ~upt. ) DETAIL'S OF OPERATI.0.NS, DESCRIPTIONS & RESULTS PERFORATING RECORD (cont...) PRESENT CONDITION C-2 Sd, Sqz. w/ 50 cu. ft. Lo-filtrate Class "G" cmt. to a final press, of 1600#. C-2 Sd. Sqz. w/ 125 sx, Lo-filtrate Class "G" cmt. to a final press, of 1300#. B-5 Sd. Open for production. $-5 Sd. Sqz. w/ 100 cu. ft. Lo-filtrate cmt. to a final press, of 1300#. B-5Sd. Block sqz. (bad sqz.) Broke dwn. w/ 1750#. B-5'Sd. Block sqz. w/ 200 cu. ft. Lo-filtrate Class cmt. Sqz. 136 cu. ft. below tool to a max. & final press. of 3200#. B-5 .Sd. (Bottom). B-5 Sd. (4 hpf) w/ 4"OD Hyper Jet II csg. gun. B-5 Sd. Sqz. w/ 90 sx. Class "G" cmt. to a final press. of 1500~ - Ok. B-3 &B-4Sd. Sqz. 75 sx. to 3000 #. Sqz. 75 sx. Lo-filtrate Class "G" cmt. to 2500#. A-ii Sd. A-10 Sd. YFELL HEAD ASSEMBLY ~ASING HEAD: Cameron 10" X 3M 2ASING HANGER: 2ASING SPOOL: CIW AW Slips. ?USING HEAD: Cameron 10" 3000# X 8" 3000# DCB .~JBING HANGER' ?UBING HEAD TOP' Cameron-Dual 2 7/8" split.,hgr. 8" w/ 8rd EUE UP. 8" 900 Series. /IASTER VALVES: 2 2 9/16 bore on 4" CC w/ integral tee 2ttRISTMAS TREE TOP CONN.: CIW 2 ]/2" slim Cameron PAGE UNIOI1 OIL OF CALIFOP IIA I,£LL I ECOt D LEASE KENAI UNIT I',ELL IlO, 43-? wo FlED KENAI GAS FIELD DATE ETD 1 6/14/75 2 6/15/75 3 6/16/75 4 6/17/75 5 6/18/75 6 6/19/75 7 6/20/75 8 6/21/75 9 6122/75 5707~TD 5620 'ETD Cmt.Plug 5707'TD 562~'ETD 5707'TD 5620'ETD 5707~TD 5707'TD 5156'ETD Perm. Pkr. 5707'TD 5620'ETD Junk 5707'TD 5315'ETD Cmt. Ret. 5707'TD 5315'ETD Cmt. Ret. 5707'TD 5315'ETD Cmt. Ret. DETAILS OF OPERATIONS, DESCRIPTIOI'IS g RESULTS (Footage 0') Kenai Drlg. Co. Rig #3 completed Turnkey Rig move & commenced company operations @3:00 pm, 6/14/75. Pumped 20 bbl. pill of circotex, dwn. LS tbg. Held 300 psi w/ fluid @ perfs. Bled back @ surface to 0 psi-ok. Pumped 20 bbl. pill of circotex dwn. SS tbg. Held 300 psi w/fluid @ perfs. Bled back @ surface @ O psi-ok. (Footage 0') RU slickline unit & opened "XO" sleeve in LS @ 4565'. Circ. LS & csg. annulus w/ 64# W@ fluid. Opened "XO" sleeve inLS below dualpkr. @5153'' Circ. LS & SS tbg. w/ 64#WO fluid. Installed BPV's. Removed x-mas tree & installed 10" 3 M BOPE. (Footage 0') Completed installing kill & choke lines. Tested BOPE to UOCO specs. 3000 psi-ok. Completed @ 3:30 am. RU Dialog & cut SS tbg.@4518'. Poohw/ 2 7/8" SS tbg. & accessories. Ran Dialog in LS tbg. & made cut #1 below dual BOPT pkr. @ 4655'. Attempted to release dual pkr. @ 4601' by rotation. Unable to get rotation to pkr. Ran Dialog free point. Tbg. stuck @ 4533' (opposite "XO" sleeve in SS tbg.) Ran Dialog tbg. cutter & cut LS @ 4475' (above "XO" sleeve). (Footage 0') Completed laying dwn 2 7/8" LS tbg. PU OS to latch LS tbg. TIH picking up 3 1/2" DP. Milled over top of LS tbg. fish @ 4475' & engaged fish. RU Dialog & cut LS tbg. @ 4548'. Jarred on fish for 3 hrs. & jarred free. (LS stuck opposite "XO" sleeve in SS @ 4533'). (Footage 0') Pooh. Rec. 75' of ES fish. Reran OS & milled over top of SS fish @ 4518'. SS fish free. Pooh. Rec. all of SS fish. Reran OS w/ L-H grapple. Latched onto LS fish @ 4548'. Released BOT hyd. pkr. 04601' w/ right hand rotation. Pooh. 12ec. pkr. & 102' oftbg. Top of LS 04655'. Redressed OS & ran in hole. Milled over top of LS fish 04655'. PU tbg. & cleared perm. pkr. bore @5156". Circ. & cond. W@ fluid. (Footage 0') Pooh. Rec. all of LS fish. Laid'dwn. 2 7/8" tbg. & fishing tools. Ran 7 5/8" Baker pkr. picker. BO prod. pkr. @ 5156'. Pooh. Rec. perm. pkr. Left btm. section &junk pusher off pkr. in hole. TIH w/ 6 3/4" bit to junk pusher @ 5158'. (Footage 0') Pushed junkpkr, to 5616' (cmt. plug @5620'). Pooh. RU Schlumberger & ran CNL-FDC-GR Log from 5330'-3970'. Ran cmt. ret. on WL & set @ 5535' to sqz. off C-2 Sd. for abandonment. TIH w/ DP. DP failed to test. (Footage 0') Pooh w/ DP. Released rig to replace DP & make repairs'. (Footage 0') PU new string of 3 1/2" DP. Set into ret, @5535' & sqz. C-2 Sd. perfs, w/ 50 cu. ft. Lo-filtrate Class "G" cmt. to a final press, of 1600 psi. Ran crat. ret. on WL & set @ 5315'. Ran stinger on DP & sqz. off C-1 Sd. perfs, w/ ]25 sx. I,o-filtrate Class "G" to a final press, of 1300 psi. Pooh. RU Schlumberger & perf. the Pool 5.2 Sd. frown 5038-5088- for production. UNIOI'I OIL ' OF CALIFOP , IA ¥£LL t ECORD LEASE KENAI UNIT ~,,~LL l~O, 43-7 wo FIELD KENAI GAS FIELD DATE 10 6/23/?5 11 6/24/75 lB 6/25/75 13 6/26/75 14~ 6/27/75 15 6/28/75 16 6/29/75 5707'TD 5300'ETD Cmt .Plug 5707~TD 5300~ETD Cmt,Plug 5707'TD 5300'ETD Cmt .Plug 5707'TD 5300 'ETD Cmt. Plug 5707'TD 5300'ETD Cmt. Plug' 5707'TD 5300'ETD Cmt. Plug 5707'TD 5300'ETD Cmt. Plug DETAILS OF OPERATIONS, DESCRIPTIOHS ~, RESULTS (Footage 0') Completed perf. 'the B-5 Sd. Pool 5.2 from 5038-5088' £or production. RD Schlumberger. Ran 6 3/4" bit & scraper to top ,oJ~cmt. @ 5300"(cmt. ret. @ 5315'), circ. & cond. W@ fluid. RU SChlumberger. Ran junk basket & guage ring to 5050'-ok. Ran Baker,Model "D" prod. pkr. Set @ 5000'WLM (E Log). RU & started 'running 2 7/8" dual prod. tbg. strings & accessories. (Footage 0') Completed running 2 7/8" dual production tbg. strings. Located on Baker Model "D" pkr. @ 5000' & spaced out w/ locator sub 1' above top of pkr. Tested pkr. & seals-ok. Set BOT dual hyd. pkr, @ 4600' & tested ok. Landed tbg. Removed BOPE & imstalled Cameron dual x-mas tree. Tested ok. (Footage 0') Displ. tbg. strings w/ 1500 psi gas press. & closed "XO" sleeves. Flowed SS tbg. B-3 & B-4 Sd. perfs, cleaned up immediately & produced dry gas. Flowed LS tbg. B-5 Sd. perfs. flowed 90% wtr. for 6 hr. test. SI well. Killed LS & SS tbg. w/ 64#/cu. ft. 5% KCL Dril-S W@ fluid. (Footage 0') Removed x-mas tree. Installed 10" 3M BOPE & tested to 3000 psi-ok. Released SS 2 7/8" tbg. from BOT dual. hyd. pkr. @ 4600'. Unable to pull SS due to collars fouling. TIH w/ tbg. cutter on WL & cut LS 2 7/8" tbg. @ 4645'-below dual pkr. Made 2nd. cut on LS @ 4572'-above dual pkr. RU dual tbg. equipment. Pulled LS & SS tbg. dually. Rec. all SS & 4572' of LS. Changed pipe rams to 3 1/2". PU OS w/ 2 7/8" grapple to catch top LS fish @ 4572'. (Footage 0') Ran OS & latched top of LS fish @ 4572'. Released BOT dualhyd, pkr. @4600' &Pooh. Rec. pkr. & tbg. to 2nd cut on LS @ 4645'. Reran OS & latched top of LS fish @ 4645'. PU out of WL pkr~ @5000'. Circ. & cond. W@ fluid. Pooh. Rec. totalLS tbg. (Footage 0') Ran short seal assy. on 3 1/2" DP. Stabbed into Baker Model "D" pkr. @5000'. Pumped into B-5 Sd. perfs, from @ 12 cu. ft./mtn w/ 1200 psi. Sqz'd offperfs, w/ 100 cu. ft. Lo-filtrate cmt. to a final press, of 1300 psi. Bled to 1000 psi in 15rains. Poohw/ seal assy. Ran 6 5/8" bit & scraper. No cmt. on top ofpkr. @5000'. Pooh. Ran BO shoe &pkr. picker. BO pkr. 4 hrs. Released tool & Pooh. (Footage 0') Changed BO shoe. BO & retrieved pkr. less btm. slips. Ran 6 5/8" bit &junk basket. Tagged junk 0 5000' & pushed to 5066'. Drilled 'on' junk & cmt. from 5066'-5070'. Pooh. Lost 2 cones off bit. Ran globe basket. Drilled on cmt. &junk from 5070'-5090'. Broke thru cmt. @ 5090'. Pooh. Rec. both cones & pkr. parts in junk basket. UNIOI' OIL CQMP/ 'h' OF CALIFORItIA '£LL i COI LEASE KENAI UNIT I',[LL 110, 4B-? wo FlED KENAI GAS FIELD DATE ETD 17 6/30/75 ]8 7/1/75 19 7/2/75 20 7/3/75. 21 7~4/75 22 7/5/75 5707'TD 5300'ETD Cmt. Ret. 5707 'TD 5111'ETD Cmt. Ret. 5707'TD 5111'ETD Cmt. Ret. 5707'TD 4998'ETD Cmt. Ret. 5707'TD 4997'ETD Cmt. Ret. 5707'TD 4997'ETD Cmt ,Ret. DETAILS OF OPEP~TIONS, DESCRIPTIOHS ~, RESULTS (Footage 0') RIH w/ 6 5/8" bit & scraper. Stopped @ 5071'. Worked thru & CO fill to ETD @ 5300'. Circ. & cond. WO fluid. Pooh. RU Schl, & RIH w/ guage ring & JB. Stopped @ 5083'. Ran 4" Hyperjet csg. gun & perf. @ 4 hpf from 5130'-5132' for blk. sqz. of B-5 Sd. iran guage ring w/ JB. Stopped @ 5083'. (c'sg'. damaged) Pooh. RIH w/ 6 1./2" OD tapered mill. Reamed & worked thru bad csg. @ 5083'. RIH to 5136', Circ. & cond. mud. Pooh. (Footage 0') RU Schl. Ran guage ring & JB-unable to get be]ow 5083? Ran cmt, ret. on 3 1/2" DP & set @5111'. Broke dwn. perfs, from 5130'-5132'w/ 1750 psi. PI 16 cfm @2200psi. Mixed 200 cu. ft. Lo-filtrate Class "G" cmt. Sqz. 136 cu. ft. below tool to a maximum & final press, of 3200 psi. Rev. out excess cmt. Pooh. Made 6 5/8" bit & scraper run to top of ret, @ 5111'. Pooh & RU Schl. Reperf.' btm. 10' of B-5 Sd. interval from 5071'-5081'(CNL) & from 5075'- 5085' (E Log). Ran test tool & set @ 4995'. .Displ. DP w/ 1475 psi gas. Opened tool @ 9:00 pm. Bled press, on DP to 0 psi in 45 rains. Left tool open for a total of 2 hrs. w/ weak blow. Pulled tool loose. Took 14 bbls to surface fluid on DP. Total of 12 bbls formation fluid entry. Total ·hydrostatic on perfs. @ end of test 1100 psi. Completed Rev. out. Pooh w/ test tool. (Footage 0') Completed Pooh w/ test tool. RU Schl. & reperf, the Pool 5.2 B-5 Sd. from 5035'-5075' using a 4" OD Hyperjet II csg. gun @ 4 hpf. Reran test tool to 4995'. Displ. WO fluid in DP to 4000' w/ 1800 psi gas press. Set tool & opened perfs, to surface. Bled press, to 0 psi in 45 rains. Had weak blow. Left tool open a total of 2 hrs. SI & rev, out. Had 25 bbls fm. fluid entry. (brackish wtr.- CL-7000 ppm & very little gas). Pumped 500 gals. 15% HCL into B-5 Zoneperfs, No change in PI press, w/ acid @perfs..6 cfm @ 1200 psi. Shut dwn. pumps. Press. bled to 5000psi-30 mins. Let acid soak 40 mins. Displ. DP w/ 1800 psi gas press. Reset · tool. Openedperfs. to surface. Bled to 0 psi-30 mins. Began heading wtr. in 40 rains. Making +10bbls wtr. per hour & very little gas. (Footage 0') Completed testing the B-5 Sd. p~rfs. Tested 12 hrs. w/ no change. Rev, out & Pooh w/ test tool. Ran cmt. ret. on DP & Set @4997'. Sqz.'d off the B-5 Sd. perfs, from 5038'-5088' w/ 90 sx. Class "G" cmt. to a final press, of 1500 psi-ok. Set RBP @ 4625' above the B-3 & B-4 Sd. perfs. & dumped 40' of sd, plug on RBP. Perf. base of the A-Il Sd. @4486'-4488'. Ran sqz. tool & set @ 4416' to blk. sqz. (Footage 0') Broke dwn, perfs, w/ 1350 psi. Mixed 100 sx. Lo-filtrate Class "G" cmt. Sq'z.'75 sx. below tool to a final press. of 3000 psi. Perf. the top of A-10 Sd. frorn~362'-4364'. Ran sqz. tool & set @4292' toblk, sqz. Broke dwn. perfs, w/ 1150 psi. Mixed 75 sx, Lo-filtrate Class "G" cmt. Sqz'd. 75 sx. below tool to a final press of 2500 psi. Drilled out firm cmt. from bi](. sqz. work opposite A-10 & A-Il perfs. CO to top of sd. plug @4585'. (Footage 0') Perf, the A-ll Sd. from 4446'-4480'DIL for prod. Perf. the A-10 Sd. from 4370'-4400'DIL for prod. Ran test tool & set (04320' Tested the A-10 &A-il Sds. for prod. Tested appro,x. 7.8 mmcf/day PAGE I,b,' UNIOII 0IL C(I'/PA ff OF CALIFORNIA KENAI UNIT I'/ELL ti0, 43-7 W@ FIELD KENAI GAS FIELD DATE 23 7/6/75 24 7/7/75 252 7/8/75 5707 ~TD 4997'ETD Cmt .Ret. 5707 4997'ETD Grot' Ret. 5707'TD 4997'ETD Cmt. Ret. DETAILS OF OPERATIONS, DESCRIPTIOItS & RESULTS w/ no wtr. & no. sd. Pooh w/ test tool. Ran retrieving tool. Washed sd. & retrieved RBP @ 4625'. (Footage 0') Ran bit & scraper. CO to cmt. ret. @ 4997'. Ran WL guage ring & JB to 4700' ok. Ran Baker Model "D" 7 5/8" prod. pkr. & set @ 4590'DIL. Laid dwn. 3 1/2" drill pipe. I~U to run dual 2 7/8" prod. tbg. strings. (Foo.tage 0') Completed running dual strings of 2 7/8" prod. tbg. Stabbed into LS WL pkr. @ 4590'.' Tested w/ 400 psi-ok (excess of 400 psi-perfs, taking fluid). Spaced. out BOT dual hyd. pkr. & set @ 4282'. Tested to 4000 psi-ok. Installed BPV's in LS & SS tbg. hgrs. Removed BOPE & installed x-mas tree. Tested to UOCO specs. Ran WL shifting tool & opened circ. sleeves in LS tbg. Displ. tbg. & csg. w/ inhibited pkr. fluid. (Footage 0') Completed displ, tbg. & csg. annulus w/ inhibited pkr. fluid. Displ. LS &SS tbg. w/ 2000 psi gas press. Closed circ. sleeve. Blew dwn. & cleaned up LS & SS tbg. SI SS Pool 3, A-10 &A-Il Sds. @ 1375 psi. SI LS Pool 5.1, B-3 & B-4 Sds. @ 1410'psi. SetBPV's. Released rig @ 6:00 am for. Tur, nke,y rig move to KU #33-30. FINAL REPORT Of'il212 PAGE UNION OIL CCt ?/ Y OF CALIFORNIA I',ELL IIECORD LEASE KENAI UNIT I'~ELL NO, 43-7 wo FIELD KENAI GAS FIELD DATE JTS. 87 1 34 1 15 1 1 154 JTS. DETAILS OF OPERATIONS, DESCRIPTIOHS g RESULTS LONG STRING TUBING DETAIL DESCRIPTION 3 3/16" OD Mule Shoe 2 7/8" N Nipple 3.25"OD X 2.205'ID 2 ?/8~ .N'80 6.4# EU 8rd Pup Seal Assy.-Baker Model. D Perm. Pkr. Baker Model D Perm. Pkr. set w/ WL Locator SUb 4 3/8"OD X 3 3/16"ID 2 7/8" EUSrd X 2 7/8" Butt. X-over 2 7/8" N-gO 6.4# Buttress Tbg. 2 7/8" Otis XO sleeve 3 3/4"OD 2. 313"ID ' 2 7/8" N-80 6.4# Buttress Tbg. 2 7/8" EU 8rd X 2 7/8" Butt. X-over Blast Jis. 3.687"OD X 2.325"ID 2 7/8" EU 8rd X 2 7/8" Butt. X-over 2 7/8" N-80 6.4# Buttress Tbg. 7 5/8" X 2 7/8" X 2 3/8" Brown Hysky Hyd. Dual Pkr. 2 7/8" N-80 6.4# Buttress Tbg' 2 7/8" EU 8rd X 2 7/8" Butt. X-over 2 7/8" Otis XO sleeve 2 7/8" N-80 6.4# Buttress Tbg. 2 7/8" N-80 6.4# Buttress Pup 2 7/8" N-80 6.4# Buttress Tbg. 2 7/8" N-80 6.4# Buttress Pup 2 7/8" N-80 6.4# Buttress Tbg. 2-7/8" N-80 6.4# Buttress Pup' Cameron Split Hgr. Ldd above ground level Ground level to KB Tbg. head to KB LENGTH 1.16 .55 10.15 11.40 1.12 1.22 27.55 4.00 59.77 1.95 129.84 1.22 63.01 6.30 31.48 1.40 3.45 2690.05 6.00 1052.21 6.O0 478.57 10.10 ].75 3.00 TOTAL JTS. BOTTOM 4603.26 4602.10 4601.55 4591.40 4590.00 4580.00 4578.88 4577.66 4550.11 4546.11 4486.34 4484.39 4354.55 4353.33 4290.32 4284.02 4252.54 4251.14 4247.69 1557.64 ].551.64 499.43 493.43 14.86 4.76 3.00 -0- -0-- TOP 4602.10 4601.55 4591.40 4580.00 4578.88 4577.66 4550.11 4~46.11 4486.34 4484.39 4354.55 4353.33 4290.32 4284.02 4252.54 4251.14 4247.69 1557.64 1551.64 499.43 493.43 14.86 4.76 3.00 --0- 15.50 12.50 PAGE UNIOII OIL Cff~PA~f¢ OF CALIFORNIA t,ELL IECORD LEASE K~NAI UNIT 1'ELL NO, ~B-? wo FIELD KENAI GAS FIELD DATE ETD JTS. 135 137 JTS. DETAILS OF OPERATIONS, DESCRIP.TIONS g RESULTS SHORT STRING TUBING DETAIL DESCRIPTION LENGTH 2 3/8" EU 8rd N Nipple 2 3/8" EU 8rd 4.6 N-80 Pup 7 5/8" X 2 7/8" X 2 3/8" Brown Hyd. Husky Dual Pkr. 2 7/8" 6.4# N-80 Butt. Tbg. 2 3/8" Otis XO sleeve 3.75:'OD 1.895"ID 2 3/8" EU 8rd X 2 7/8" Butt. X-over 2 7/8" 6.4# N-80 Buttress Tbg. 2 7/8" N-80 6.4# Buttress Pup Cameron Split tbg. hgr. Landed above ground .55 11.23 8.90 60.87 3.37 1.37 4190.69 10.10 2.25 3.00 TOTAL JTS. BOTTOM 4303.20 4302.65 4291.42 4282.52 4221.65 4218.28 4216.91 26.22 16.12 13.87 TOP 4302.65 4291.42 4282.52 4221.65 4218.28 4216.91 26.22 16.12 13.87 10.87 !~ .~."~N_ ~ ~ II Ir I [I II I I llillll ' ................................................................... _ SHORT' STRING: --, 1. Tbg. hgr. 0 13.87'. 3 : 2 Pup jt 2 7/8" N-80 BUtt. 0 -- , ; 26.22'. [ '-- 3. X- Over 2 3/8" EUE 8rd X 4:~ , ~ 2 7/8" 'Butt. ~ 4216,91', ' ~] -- '4. X-over sleeve-Otis 2 3/8~.[, ', 3 75 OD X 1 895 ~ ~. .' ', 4218.28'. -- 5 14~ 5. Pkr.-dual-Brown Hyd~ 6]: ' 15 Husky. 7 5/8" X 2 7/8" X g ~18" 7 ~ 0 4282.52'. 21. Perm. pkr.-Baker w/ seal ass3' 6 Pup jt. 2 3/8" EUE $rd~ ~ ~ l~ ~-- i Model "D" 0 4578 88' ' " I I ~ ' ' ,~ -- 16 22. Pup jr. N-80 6.4g EUE 8rd N-80 ~ 4291.42'. -- ~' 4580,00' 7. N Nipple 2 3/8" EUE 8rd ~ , i [ ' . 4302.65'. _ 17 23. N Nipple 2 7/8" X 3.25"OD X ~ 18 2.205ID ~ 4601.55'. LONG STRING: ~ ~ 24 Mule shoe 3 3/16"OD ~ 4602 10 ~ ~ 19 9. Pup its. 6.4g Bu~. 2 7/8~' N-80 ~ :-- ~ 22 0 4.76'. i~ o 23 10. Pup it..6.4g Butt,, 2 7]8~ N-$O 1-- 24 0 493.43' . 11. Pup jr. 6.4g Butt~ 2 7[8~' N-80 ~ 1551.64'. 12. NO sleeve Otis 2 7/8" ~ 4247.69'. 13. X-over 2 7/8" .EUE X 2 7/8" Butt~ ~, 4251.14'. ~: 14. Pkr.-dual-BrOwn Hyd. Husky 7 5/8" X 2 7/8" X 2 3/8" ~ 4284 02' 15. X-over 2 7/8" EUE 8rd X 2 7/8" Butt. 0 4353.33'. 16. Blast its. 3.687"OD X 2.325"ID. ~ 4354 55' , 17. X-over 2 7/8" EUE 8rd X 2 7/8" Butt, 18 X-over sleeve-Otis 2 7/8" 3 3/4"OD" 2.313~ ~ 4546.11'. 19. X-over 2 7/8" EUE 8rd X 2 7/8" Butt, O 4577'66'. ~ 20. Locator sub 4 3/8"OD X 3 3/16ID 0 4578.88' [ i iiii ~ ~ i Ip. i i i i i i i iiii1 iii i ..... WELL SCHEMATIC ~-'o. ' ' '~ ~NAI kTNIT WELL ~43-7 s~u - -- ~ - ~, ~ ,l , i , , ,~ , , , - - ............ i i i usiou oil coU s7 ck[lm hl ....... ' [ ..... I I ~ ~ ....... m ~ , ' FOR~.~ 247 (NF'W '~6~,} IRON WORKo, INC. P. O. BOX 1212 -- HOUSI'ON 1, TEXAS · ORDERED J SHIPPED - 2'~ 7°6O .'. · ... · 4.30 3.26 . · 148:00 · 6.86 ;. ~ 1.89 · .50 · . : 84o01 PART NUMBER 12117:..2 4- .: ' . . ~- -.' LC ":'~3721 "1 · 6994 - 4 _ 21013 12 3297~ 1 ~ _' 591 7 9 5926 24' · . . 15107 lO 15109 10 15111 10 151~6 9 DUAL STRING TREE AS 'FOLLOWS . "~-:-?' :: : , .. .' ,. ,:..,~.'..;~- . CASING '.HEAD HATER IAE 3000~VP:.. ':'" . -.: .... /.......... , - - .....~:.:.;.,. HOUS ING'CSG HD WF"'I O"3000~IP ..I' .~.'.:.237,: ......;-. ,..:~ X 1 0--3/4'.': . .~":':-.'".,, SLIP-ON,.. . .2".. . FEM. . OUTLETS SLIP AND::S'EAL ASSeMBLY'TYPE I "-157; · · . :<., : .. -~. INCL. ';]:. ] ..,, . .=,.-. ~,-,--_ '.: '..';'~':1.?- ." · · : · ' i ~'J" ,~ ,..,:.,.= :.~. ..- . ., .,.. - ,, :, ..=.? :,; ;-:".. I O"X 7-5/8" OD, 1 -ALLEN WRENCH · PLUG~ BULL 2" LP i .." .i., : . : 'PPLE :2"" XX N -'X 6" VALVE,.CAM~RON BALL 2" X !-1~/!6"' BORE APJ..,.:3QOO~'/P S/E,- LESS LEVER ' . ,- -'"'t' ' ' :" '- GASKET' STEEL RING 12-3/4" PD-R-$3..." STUD 1'~/8" X 10" '"'" '" · ,' . .: '... ~:.' :~......- - .; · . . '.',. ., , . .- . ,.:, '..": ~..:-- NUT 1-3/8" ': '" "'" '" "' "':' ..- ASSEMBLY".SEAL TYPE R, 1 5122-7 '- -.. 10" X 7'5/8" OD, INCL. ...'.i'.:.. . I TOP GLAND .. ..... .:., 1.CENTER GLAND · .. .... I BOTTOH GLAND ....:' 2 CAS lNG SEAL RI'NG TOTAL CAS lNG HEAD MATERIAL ~OTE-VALVE$ IdUST BE OF WATER AND FULL OF · . . ,~, · COMPLETELY FREE aREASEo ,o · .... . ';:..! :i:i.;:-.--.-..v..- !:i .. ' ..' ?.,.~r-.~' .'. , ~...~.;;',',.- L. :. j ·; .... ~: :. ?"] ]. · , . :~:e-., ,:~=.! :.:f" · · . !. L,;.~,- -_.~j i · -i.;"'.-"i' .o, · .~ L.].' .k" '' · ,- %,4 .'-.;'7-:' · . '.o ,... ? '. .' . .. ~.'i~': '1-' · , . -.. .. . .. .... , ,. :. · · · . · · "'-' ........ ' .,"C~'" '".~,~~' I R O N '~ C .":"'~':' '..' .. , .. P. O. BOX 1212 -- ..HOUSTON 1, '.,~ .... ..,. : ' ,.. - .. ~ ~.~', -~ . ,- , . · . . . - ,,' .... ,:~ .:'~ .... ,, "~ ,, ,:~:.;UNIONOIL 'COHPANY OF CALIFORNIA ,...,: -- ,- ~-~.~.. . .u',..:.:-.,.., · '':''- - . j ' ' ." - ~ - · ~. , '' L ,-': '' '~,. i:' ' , · . ' ' , ' ~ '., .... ' ' , . -~,- , . - .... "~ '"" ' ' ' ' " ' X . :.. ',.' "7"]~, "...,~"CAS lNG PROGRAH - 1 0'~/~" X 7-5/8"X 2-7/8"EUE ":.;, I:,';,..":~,',.,':" .' ....... ' · . .' . . . ~ .,~4::' :' "..,_ "'?:~ : .? ' · '. "~'" ~- U ~-" ~'~'." . '.~-'- " · ~.. ' ' "' '~,.L~ ' ',- -~. · , ;;'-' I I ' - ' '*:':" ' ; ~ ' ~' ' '~" ,.~.. ~...,- ,. ...... . . PA ~ PAGE; J3.M. NUMBER 3-24-65 2 B/H #926939~73-2;. · 838.79 2I .60 1.99 23.O2 348.00 . -' "-:5.80 ": 1 2.29 .- I .80 .. . .50 ,2003.75 ,. I .99 120,80 f: 6590 11 771 2 1 ... 32901 7 .. 59~"2 20 5926 9 7481 I .- goo0 49 19937 1 25970-1 6590 i'1 7416 5912 5926 · , . , · -' DEE;CRIPTiON XHAS I:REE ASSEMBLY 3000~'/P "...:': - _ . .. _ SPOOL, -TBG HO "DCB", 10" X 8'i3000~/P W/TWO 2" 5000~P STDD OUTLS, '"R"' :. BTM PREP .... :'... PLUG, CONTROL 1 1/2".. '. GASKET STEEL RING 3~.3/4'' PD-R 24 ; . . FLANGE C'OMP 2" '5000~dP 2" LP' · . VALVE CAMERON "F" GATE 2" X '-' 2-t/16" 3000#WP D/F INCL ...... 1 -HANDWHEEL .., ...... ,...: .: · . -- "' '"-i :)iUD 7/8":' ^ u . . . ,, ,, .,. - . .'. . ~ .... . .... ..~. ~..."'.-;'" ~.' NUT 7/8",. ':"': - .... ..,."' ..... · .':"' PLUG, BULL 2" LP TAPPED 1/2" NPT GASKET,'~-~E'~_F'SEALING RIN~: , STUD 1 3 ......... ..X...9-._ILZ~.. :: .-" · ~...- · . ... ' [..' .. : ·' ..:" ''.. NUT 1-3/8" -? :'.' '.' ' -" ." : -,,. · . · VALVE, CAMERON "F" GATE DUAL STRING FABRIBLOCK TREE.,. BTM FLGD 8'3000/~'~P W/2-1/2" SEAL SUB PREP & PKG PORTS :W/TWO 2-9/16"BORE bASTER VALVES ON ~4" CC W/INTEGRAL TEE, W/TOP THDD- FOR 2-1/2" SL1H UNION TREE CAPS AND TWO 2" 5000~'lP STDD OUTLS, I NCL · · . HANDWHEEL-:- .,,. ." , ..... '. CAP, CI~i.'UNION 2-1'/2~SLIH CAMERON UNION X BLKG PLUG'TPD 1,/2"NPT GASKET lEE, FLGD 2" : STuD '7/8'i, X ., - ,~ NUT . 7/8" · 'sTEEL RING X 2"' 6-1/4" · 3-3/4" PD-R-24 X 2" 5000~VP · , . · · -' AMOLINT ..,(: :.*. ',.'% -i.~ I ":' 838, · =1: · . _ :- ·. .'i' ..?. ~. ;.'. I -."....... .... · ; .~ :-~'~ _. 4..'.,::. · ·: ' -. :4' ',.'-'..:·:': L: -: ;,~,?~-, .:::_. '·'- ' ~-i- ':fi>ii '/ · - e-.;. '. ~-.' ~ -- ! ',..-,.':...: ; i': ~..'- "'-: '..~'-~:',-'---' i a .... · *';:; .:- .! ..... ":- ~5;~, '.-;:' ,' _ I ::.'..,:;:i 2 ' :.'-,L,":~:-: ~' · ~. .... '~----'. '~::1. .:4'.1'2, · ., ! 2005 o .... . . '~ · : o ,. . · · o ........~ ~ - ·, . i '. · I 2Ztl, I ' }i'.18, I'lZ~. · ,o B.M. NUMDER · -, _ · e- . · ' I' ' COMPANY.OF cALIFORNJA '" o . -~,', ON'i ON~,OIL ?":F -'. ' -. i(~,.;:CAS lNG PROGRAM - · - ~ ';,:, .: hr%.' ..... ..... :: ~.. .... , s / '" · '' ORDERED UNIT .; ! ?..-,.::, '1 -. 348.oo . · · . · · -'28.68 .- . · .. : 'i.'1.99 · -'2,2 . "1 96, O0 '"--.28.68 199~7 I SCRIPTION 8~48 1 '~ '" ' 80 '~'-~ " : - %~.,?.'.:'; ~ "':, :', :- · . '.. ' . -".-- ,t' r %% ' v ! t. . - ~ ..,.._?.-.,~, .- ... 6S~o ii .'L/::"; GASKET STEEL RING '~-'3//4'" · . "591 2 ::ii STUD 7/8'! ·× 6-1/h" ., - ~'~ 1~ ',. 9 ",' :.':.~- NuT 7/8" ........... ' .... ~ .;,~..;. , ;L - ,, . %-.. , .~; :- :, ,?-i, 1 1:':' VALVE, CAI4ERON BALL 2" 5926 3hrS'~ ' :.:,.~.:~ XMAS TREE ASSEMBLY, CONTINUED " -'. ... ! ~ ,, .-'? "-VALVE CAHERON" GATE 2" X '-" '"~ : 2-1/1 6" 30.O0~zWP D/F' I NCL l-HA DWHEEL : ." ' :-'~ · . .. ' FLANGE }/ELD NECK '2"5000~/P RTJ SCH ..~ · PD-R-24 ~ , . :;;, ..-- .(. · ' I X 1-13/16" P 8348 1. AMOUHT ' D/F, LESS LEVER - - · ' ';" ': ', .' ;:' ~ ", '.",..-'i" ' 'i'."i:;' NECK2"5'0°o~"/P RIT'J' S ::!i;'. ~"', .. o . ,. · . . .. · · . i,. i · .. iI NOTE-VALVES OF WATER AND · ,, ::'4: -: "" ".'~';,Z',;.'~:-.- ~" .... -.'.' '. ," ;'::Z' L: .... . .... ,;,,-...,:...: - ·... . .: ~ o:; ~ . ~ .,, :;--- .-;, · - ........:..~....,. .'.'1, ': ,,... .;. ~j .... ~i '?-.%- .:. · -'-;x ..., .; ~ ; ~.~*...~ ~.. ....:.~o: -.. ~, ~. ,; , , · J~ ~ · .~.~....'..., - · ..,~ · - . ~. ,,.. ..,;,~.,~; ,, :'.:'.. ,~ .. .~ , ..~ ;'% .- '.., ,,, , I ' FREE -',.',: ~.. ,N .. ,, ,;' ~ ,, MUST BE FULO COMPLETLY GREASE. . "' "¢" '' IRON WORKS, INC. .". · ... '. · ' P.O. BOX 1212 -..-HOUSI'ON 1, IEXAS /' :~':;'~,". ,.% . ~., ,.-..' .,:. · ];,..-~.','~. ,' '..:. ~- · . ''' ~J'' ' - .' . ,~, ."1'] ,, . q- f ~ ' . ,: -..~ * , -' . . ~/:UNION'OIL COMPA O A IFO lA ::c,.~ ''. ~:~-:CA~NG.'PROGRAM- 10"B/q" X 7-5/8" X ..,.~ ~.~ ~ ,' . ,~ ~- .., ~ . , , .' · .., .,. .... ..[. ,. ,:.. DATE · 24 -65 , , · · · . · · . . . 2-7/8"EYE X . ,]..: . .. 2-7/8"EUE ON 4" CC .,~ :..: . '":-,':-:..'" · .. . ....... - ... ,..'. ~':'..:%-,.;/ . ...: _ ~ ..;:.:.-;~.,:... . ._.' ;':.~:,.,- , ,. ., . .. .... DESCRIPTION UNIT PRICE I LOOSE X,~,,AS TREE HATER IAL ', '. :' :.~. :."-. : ,:-,-:". :'.L 'i:;',i~-7:;~:.' . .,, ......... .... '~ .., :;" ,, '- :'-'" .-' -"'"- ',. ;::': :2::' _' ,"i,' ~- 48 ]. ~-:'~-'"' .-:i'-.-- ',i!j;f:i-;:",:-. HANGER~"/~SY,' TBG" "DCB". 8" X 2.~ HANGER ?SUB, 2-7/8"EUETOP g BTM ".'...".': ' "'-:'I 8800 '~ ~4' :;: :i "'"':1 "' -' II, ICL' '::'!!,. "'." '"" '.'. ', ' : ;"'" ...i:.~.-: ":....~i'l.:-'-'-765o .8-?--j..i::ii:: ST I CKS:PLAST tC. PK~ '. .. "':' ' ' "-"" " 'i :'::::"';"-'" · .., ....... ,.i,....:~: ._.. . :.,.~.,...,~., .: ON 4"' ;..CC'.::.. ' . -..: ;.' . ..~:.:...".':.,'-).' t .. :.':,,,:;' .,"., AMOUNT-! 23.OO 75.65 . : .o0 4.00 "2841 5 =2841 5 -.! . '"'~"~-~' ~^Rc~ 4'-~/2" FACE 3000# ~1.~ i 1~ , ,,~ ~,~ - . ... .~ .: . .' .~ ..., · .-,. ., !/'- .~:'"/':~. · *-,¢ ..- .. / .... :.. PLUG,;"~BLKG THD 2'7 8"EU'E HALE,' SEI .... .. :,..,.. ~,".'- ::;" ,. ~ ,. , ,? :. -,.:":-: LEVER ,. BALL VALVE. ...~'"' .-.......,'- ~,:~:.,.';'~' ":. .1', :' :-,' :?~:-. LEVER ;?~'~'ALL VALVE '" . ,,... · ,, '.,. . -.. ~ ..~. , XHAS TREE HATER IAL" · , TOTAL"LOOSE .-::.; ,. PR ICE S : · .. · TOTAL NET PRICE .FOB HOUSTON, N/FRT ALLOWED TO LONG BEACH, TOTAl_" "LIST . o· . LESS DISCOUNT · I , ! ,, ., : L T~XAS CALIF. Union Oil and Gas~sion: Western Region Union Oil Company ,.,r California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 279-7681 A. ugust 12, 1975 Mr. Rodney Smith Regional Oil & Gas Supv. P. O. Box 250 Anchorage, Alaska 99501 RE: KU #43-7 1; ,::.: KU #33-30 ..... KENAI OAS__FIELD Dear Mr. Smith: Enclosed for. your files are two (2) copies each of the Lessee's Monthly Report of Operations (Form 9-329) and the Well Completion or Recomp!eti°n Report & Log (Form 9-330) for the above captioned Kenai Gas Field workovers. Very truly .yours, David A. Johnson Drilling Engineer sk Encl. (6) cc: Marathon Oil Co. Atlantic Richfield Co. Standard Oil Co. of Calif. · ~~.~ Tom Marshall-Division of Oil & Gas Dear Mr. Marshall: IJnion Oil and Gas ~ion: Western Region Union Oil Company ~, California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 279-7681 August 12, 1975 union Mr. Tom Marshall Division of Oil & Gas State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Enclosed for your files are the following reports: TBUS G-22 (12-32) TBUS G-2 TBUS D-27 (31-6) TBUS D-20 (22X-6) TBUS D-2A (13-5) TBUS K-21 (21-28) Kenai Unit #33-30 Monthly Report (Form P-4) Completion Report (Form P-7) Monthly Report (Form P-4) Formation Test #1 & #2 Monthly Report (Form P-4) Monthly Report (Form P-4) Monthly Report (Form P-4) Monthly Report (Form P-4) Monthly Report (Form P-4) Completion Report Monthly Report (Form P-4) Completion Report Kenai Unit #43-7 Completion reports for TBUS D-27 and TBUS D-20 will be forwarded to you within the next week. Very truly yours, David A. Johnson Drilling Engineer sk Encl. cc: Marathon Oil Co. Atlantic Richfield Co. Standard Oil Go. Phillips Petroleum Amoco Production Skelly Oil Co. Mr. Rodney Smith-USGS F~rm No, P---4 ~, ~- 1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COAAAAITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS wI~LL WI~LL OTHER ~. NAME OF OP~t, ATOR UNION OIL COMPANY OF CALIF. 3. ADbRESS OF OPEI~,,TOR 909 West 9th Avenue, Anchorage. Alaska 4. LOCATION OF WF, LL 404'S & 4231'E of the NW corner. Section 7: T4N, RllW, S. M. SUBMIT ~ DUPLICAT~ qq501 AP1 NLrlVIEHiCAL CODE 1~-10091-00 LEASE DESIGNATION AND SEIIlAL NO. A-028142 IF INDIA]~. ALOT iEE OR TRIBE NAME 8. L,~IT FAriA{ OR LEASE }IA]CIE Kenai Unit g WELL KU #43-7 10 FLghD AND POOL, OR WILDCAT Kenai Gas Field-Pools 5.1 & 3 11 SEC, T.. R.. M. (BO'I~I'OM HOLE Section 7: T4N, RllW, S. M. 1~. PERNIIT NO 65-11 13. REPORT TOTAL DEPTH AT END OF MONTH. CHA~NGES IN HOLE SIZE, CASING AND CE/vlF_,NTING JOBS INCLUDING DEPTH SET AN]) VOLLrlViES USED, PEllFORATIONS, TESTS ~ HESULTS FISHING JOBS JILNK I_N HOLE AND SIDE-TR~CKED HOLE AND ANY OTI-IER SIGNIFICANT CHA/~GES IN HOLlil CONDITIONS Ran & set cmt. ret. @ 5111'. Sqz'd perfs. 5130'-5132' w/ 118 sx. Class "G" cmt. Made bit & scraper run to 5111'ETD. Reperf. the B-5 Sd, from 5071'-5081' & from 5075'-5085'. Ran test & set @'4995'. Tested B-5 perfs.-no entry, Reperf. the B-5 Sd. from 5035'-5075'. Acidized perfs w/ 500 gal of 15% HCL acid. Ran & set test tool @ 4995'. Tested the B-5 Sd. perfs. @ +240 bbls/day wtr. Ran & set cmt. ret. @ 4997'. Sqz'd. the B-5 Sd. perfs, fOr abandonment w/ 90 sx. Class "G" cmt. Perf~--- btm. of A-Il Sd. from 4486'-4488'. Straddled perfs, w/ retr~able sqz. tools. Sqz'd./ perfs, w/ 75 sx. Class "G" cmt. Perf. top of A-10 Sd. from~362'-4364'. Set sqz. tool @ 4292'. Sqz'd perfs, w/ 75 sx. Class "G" cmt CO wellbore. Perf. th~._B-1i" Sd. from 4446'-4480' & the A-10 Sd. from 4370'-4400' for prod. w/ an RBP set @ 4625' and test tool set @ 4320'. Tested the A-10 & A-II Sd, @ +7.8 MMCF/D w/ no wtr. CO wellbore to 4997'ETD. COmpleted well w/ dual 2 7/8" tbg. strings w/ single Perm. pkr. @ 4590' & dual hyd. pkr. @ 4282'. Tested pkrs.-ok. Installed BPV's. Removed BOPE. Installed & tested x-mas tree. Displ. W@ fluid in annulus w/ pkr. fluid. Blew dwn. LS & SS. SI well w/ BPV's installed. RELEASED RIG @ 6:00 am, 7/8/75 FOR TURNKEY RIG MOVE TO KU #33-30. FINAL REPORT NOTE--Report on this fo~ is required for ~ch Calendar ~th% regardless of the status of operations, and must ~ filed In duplicate with the otl and gas conservation commiflee bythe 15~ of the succ~ding mon~, ~le~ otherwise directed. Union Oil Compar~of California P.O. Box 6247, An,., morage, Alaska 99502 Telephone: (907) 27'9-7681 July 10, 1975 Mr. Rodney Smith United States Department of the Interior P. O. Box 250 Anchorage, Alaska 99501 RE: KU #21-6 KU #43-7 KU #33-3O ,Dear Mr. Smith: Enclosed for your files are two (2) ~opies of the Monthly Report of Operations (Form 9-329) for KU #21-6 and KU #43-7, two (2) copies of the Sundry Notice & Reports on Wells (Form 9-331) for KU #21-6 and KU #33-30. Very truly yours, Callender District Drlg. Supt. sk Marathon Oil Co. Atlantic Richfield Co. Standard Oil Co. sion of Oil & Gas - Tom Marshall IJNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form approved. ]~uc~et Bureau No. ~,,, o~,',c,, ....... .~.._.~.;,.,:,. ~- ~-;,- .......... LEASE NUMS£R ................................ U.~T Kenai Unit LESSEE'S MONTHLY REPORT OF OPERATIONS The following is a correct report of operations and production (including drilling and producing we~) fo, t~e mont~ of .... ~.u_~ ............................. , ~9.7.~., ............................................................................ Corn an UNION OIL CO OF CALIF. .~g~,,,~, .......................................................................... P Y .......................... ' ........................ A. ...... ........ .... ;;%;% ....................... ........... ..... ................ Cu. FT. OF GXS GALLONS OF BARRELS ox REMARKS SEC. AND NO. PROOVCED RECOVERED none, so state)date ~nd r~uit of teat for gasoline ~ OF ~ r~WF. RANGE WELL DA~rs BARREL~ OF OIL GRAVITY (In thousands) (~ASOLINE WATER (If (If drilling, contentdepth; ifofShutg~)down, eatme: .., ,. ~n & s~t cr:t. set. ) 511: . Sqz'd ~erfs 5130'-513: w/ 118 sx. Cla ls "G" cmt, '.ade-bi~ & ~craFer r~n toi511~'ETD. Reperf. the B-5 Sd. fr~m 5071~ .5081' & from ~75'-5£85'. Ra:~ test & s~t @ 4995' Tesied B-5 pe~fs.-no e:~try. R,;perf. the B-5 d. fro~.a 50~5'-D075' Acidized perL;, w/ 500 gal ef 15% HCL acid. Ran & set test ~ol @ 4~95' Tested the F-5 Sd. pe::fs. ~ +240 bbls day wtr Ran ~ set cmt ret 4997'.! Sqz'd. :he 1~-5 Sc[. perfs f.)r ab~,ndonment w/ 90 s×. Class G" cmt. Perf. tm. of A-i~ Sd from 4486'-4488i. Stradtled perfs, w/ retr.evable sqz. tools. Sqz'd erfs. xz/ 7! sx Class "G" cmt., Perf. tcp of A-10 Sd. from 5362'-4304'. Set sqz. ~ol @ 41).92'. Sqz'd perfs w/ 75 s:: Class "'G" 'cm~. CO wellbore. Perf. the B-il d. fror~ 44,:6'-4480' & the A-10 Sd. from 4370'-4400' for proc. w/ an RBP set @ 4625' nd test tool set @ 4320'. Tested thc A-ltl & A-il Sc. @'+7.8 MMCF/E w/ no wtr. CO 'ellbor~ to [997 ETD Co:npleted we/1 w/-, dual 2 7/8" tbg. s' rings w/ single perm. kr. @ [590' & d~al l~yd. >kc @ 428~'. ~ested pkrs.-ok.. I~tstalled t~PV's. Removed OPE. Inst,.lied & tested r-mas tree Dis pl. WO fluid in an~tulus w/ pkr. fluid. Blew wn. L~ & ~cS. SI ~xell w~ BPV's in~talle(t. ELEASigD RIG @ 6:0( am, 7/8/.75 FOR TU]}NKEY RIG MOVE ~fO KU #33-30. · . INAL R EPOI[T . __ . · .. Sd Sd W! t B( NoTE.--There were ......................................runs or sales of oil; ............................................. M cu. ft. of gas sold; ............................................. runs or sales of gasoline during the month. (Write "no" where applicable.) NoTz.--Report on this for,n is required for each ca. lendar month, regardless of the status of operations, and must be filed in ~duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. 'Forth 9-329 692-555 U.s. GOVERNMENT PRINTING OFFICE :1964--0-729-784 (January ~950) Union Oil and Gas D~ion' Western Region Union Oil Company · 3alifornia P.O. Box 6247, Anchorage, Alaska 99502 Telephone' (907) 279-7681 Division of Oil ~ Oas Anchorage, Alaska 9950~ RE: TBUS G-22 (12-32) TBUS K-21 (21-28) TBUS D-27 (31-6) /~v.~ KU #21-6 ~Z-~'/'' KU #43- 7 Dear Mr. Marshall: Enclosed for your files are two (2) copies eaCh of the Monthly Report of Drilling & Workover Operations (Form P-4) for the above captioned wells. Also enclosed is the Sundry Notice & Reports on Wells (Form 10-403) for KU #21-6 WO. Very truly yours, District Drlg. Supt. sk cc; Marathon Oil Co. Atlantic Richfield Co. Amoco Production (TBU only) Phillips Petroleum Co. (TBU only) Skelly Oil Co. (TBU only) Standard Oil Co. USGS - Rodney Smith STATE OF ALASKA SUBMIT ~ DUPLICAT~ OIL AND GAS CONSERVATION COMMI~EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 2. NAME OF OPERATOR UNION OIL COMPANY OF CALIF. 3. AD~E$S OF OP~.ATOR 909 West 9th Avenue, AnchOrage, Alaska 4. LOCATION OF WELL 99501 404'S & 4231'E of the NW corner. Section 7: T4N, RllW, S. M. APl NLr~IERICAL CODE 133-10091-00 LEASE DESIGNATION AND SERIAL NO. A-028142 7 IF INDIA]~, ALOT~EE OR TRIBE NAME 8. L,~IT FARM OR L~ASE NAME Kenai Unit 9 W~!,!, NO KU #43-7 10 F~".~-!~ A. ND POOL, OR WILDCAT Kenai Gas Field-Pools 5.1 & 3 11 SEC. T.. R.. M. (~OM HO~ o~ Section 7: T4N, RllW, S. M. 1:~. PERMIT NO 65-11 13. REPORT TOTAL DEI~TH AT END OF MONTH. CHA~NGES IN HOLE SIZE. CASING AND ClfiNIENTING JOBS INCLUDING DEPTH SET AND VOLUiViES USED, PERFORATIONS. TESTS AND HESULTS FISHING JOl~ Jbq~K IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICAA~T C/{ANGES IN HOLI~ CONDITIONS Kenai Drlg. Co. Rig #3 completed Turnkey rig move & commenced company operations @ 3:00 pm, 6/14/75. Killed well w/ 64#/cu. ft. WL fluid. Installed BPV's. Removed x-mas tree. Installed & tested BOPE. Pulled dual 2 7/8" tbg. string & CO wellbore to 5616'. RU Schl, & ran CNL-FDC-GR Log from 5330'-3970'. Ran & set cmt. ret. on WL @ 5535'. Stabbed into ret. w/ DP & sq~'d, the C-2 Sd for abandonment w/ 50 sx. Class "G" cmt. Ran & set cmt.__r_et_._ @ 5315'_. S~ta. bb_ed into~ ret. w/ DP & sqz'd, the C-1 Sd, for abandonment~ 1-~ sx. Class "G" cmt. ~'er .~ the B-5 Sd. from 5035'-5085'. Made bit & scraper trip to 5315'. Ran WL gauge ring & JB to 5050'. Ran & set & 5/8" perm. pkr. @5000'. Ran dual 2 7/8" tbg. string as programed. Stabbed into perm. pkr. @ 5000' & landed tbg. w/ dual hyd. pkr. @ 4600'. Tested perm. pkr. & hyd. pkr.-ok. Installed BPV's. Removed BOPE. Installed & tested x-mas tree. Returned well to production. SS tbg., B-3 & B-4 Sds. produced dry gas. LS tbg., B-5 Sd. flowed wtr. Killed well w/ 64#/cu. ft. WO fluid. Installed BPV's. Removed x-mas tree. Installed & tested BOPE. Pulled dual 2 7/8" tbg. s~t-r~_ H~ w/ pkr. seal assy. on DP & stabbed into perm. pkr. @ 5000'. Sqz'd. th~/Sf-5 S~.~l~ei~?~./w/ 100 cu. ft. Class ',G" cmt. Pooh w/ seal assy. CO wellbore to ~300'. 'i~U"~S-~i. & perf. from 5130'-5132' for blk. sqz. of B-5 Sd. Ran gauge ring & JB. Stopped @ 5083'. Ran 6 1/2" OD tapered mill & worked thru tight spot @ 5083'. Now: poOh w/ tapered mill. 14. I hereby ~that the fq~o~ trq,e and SZG~ N~ --Regort on this form is required for .~ch colendor ~nths regordless of r~ ItOtuS of operotions, and must ~ tiled In dupli~te with the oil and gas conservot~n commiffie by the 15~ of the iuccNdin9 ~n~, ~le~ otherwile directed. Form 10-403 REV. 1-10-73 Submit "1 ntentlons" in i r~pllce[v & "Subsequent Reports" in Duplicate STATE OF _ASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use ,,APPLICATION FOR PERMIT---" for such proposals.) WELL ~ OTHER 2. NAME OF OPERATOR UNION OIL COMPANY OF CALIFORNIA 3. ADDRESS OF OPERATOR 909 West 9th Avenue, Anchorage, Alaska 99501 4. LOCATION OF WELL ]0. At surface '11. 404'S &.4231'E of the NW corner. Section 7: T4N, RllW, S. M. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 78'GR 14. Check Appropriate Box To. Indicate Nature of Notice, Re 5. . NUMERICAL CODE 133-i0091-00 6, LEASE DESIGNATION AND SERIAL NO. A-028142 7. IF INDIAN, ALLOTTEE OR TRIBE NAME UNIT, FARM OR LEASE NAME Kenai Unit 9. WELL NO. KU #43-7 FIELD AND POOL, OR WILDCAT Kenai Gas Field-Pool 5.1 & 3 SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 'Section 7: T4N, RllW, S. M. 12. PERMIT NO. 65-11 3ort, or Other Data NOTICE OF INTENTION TO; FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING . ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS {Clearly state all pertinent detalls, and give pertinent dates, including estimated' date of starting any proposed work. Original plans for KU #43-7 were to recomplete as a dual' Pool 5.2 & Pool 5.1 gas producer. During completion operations the B-5 Sd. of Pool 5.2 tested wtr. It was believed that the wtr. was extraneous so the tubing was repulled and sqz. work was done in an attempt to shut off wtr. which was unsuccessful. It has now been determined that the B-5 Sd., Pool 5.2 is wet and non productive at this location. Present plans are to sqz. off the B'-5 Sd. perfs, and recomplete the well as a dual with Long String completion in the B-3 and the B-4 Sds. of Pool 5.1 and the Short String completion in the A-10 and the A-il Sds. of the Pool 3. PLAN OF PROCEDURE: 1. Setcmt. ret @+5000' & sqz' off B-5 Sd. Pool 5.2perfs. from 5035'-5085'. 2. Set RBP @ +46007 above the B-3 and B-4 Sds. of Pool 5.1. 3. Blk sqz. the. base of theA-11Sd, pOol 3f°r zone isolation: 4. Blk. sqz. the top of fhe A-10 Sd. peel 3 for zone isolati°n. '5. CO cmt. & retrieve RBP @ +4600'. 6. perf. the Pool 3 as'follows for production: A-10 Sd. from 4370'-4400' (30') A-Il Sd, from 4446'-4480' 7. Recomplete the well as a dual Pool 5.1 & Pool 3 gas producer. (3DI~',$1CN OF OIL AND ANCHORAGE TITLE Dist. Drlg. ,Supt, DATE: 7/3/75_ (This space for State office use) See Instructions On Reverse Side Almrov~ C°P7. · · · UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY ~'orm approved. liudget Bureau No. 42-1~$.5. LAND OFFICE .................................. ~ .~..~ .... 6=.0.~..8..1..4.~. ........... u.,, ..... .K. ~._n..a.i...U.n.~.t .................. LESSEE'S MONTHLY REPORT OF OPERATIONS ,State Alaska Coz~ty --K--e--n--a-J---B--9--r-9--u-g-h-- ........ Field .LK-.-e--n--a-i---G---a-s----F--i-e-l--c] .................................... The followir~ is a correct report of operations and prod~ctio~ (i~cl~din~ drillin~ and prod~ci~ wells) for the month, of ....................... .J...u_P_.9. ........ , 19 75 , ............................................. ~1~er~t's address ~_.O_~.__W__.~_s._t.~_~J3,._A..v__~,_n__9,¢, ................. ~- ~;'~;'~'r ..... ii~i"/O-;LO-JJ~--~'(~--qDF-'-C~2~LL~'y, - ...... Pho~,e 279-7681 Ext. 445 . _ .......... J~ent'st~'tle .... -D-2-s--t-r-!C-t---D-L]~:--~--u-p-t-: .............. 0 ALLoNS OF CU. FT. OF OAS GASOLINE AND BARRELS or Om (In thoumn~) RECOVERED ~or ~ #43-7, FIELD Kenai Tn: :/75. Kille BPV's · string . RU Sc Ran & 5535" for ab: Class fiG" ret w 1 Sd. for the 5'. Made jB to 5 '8'.' perm. progra . pkr 4600'. & hyd. Install, ~e. produc , B-5 Sd. x-mas tre( tbg. seal assy, the B-! cu. ft. Cia to 5300 from 5130 & JB. 6 1/2" Now: rig move '& common, w/ 64#/cu ft. WL f :d BOPE. Pulled ,C-GR Lo into ret. '/ DP & s( Ran & set mt. ret. w/'l 5 sx. CI )er trip to 5315' 5000'. Rm dual 2 0' & landed tbg. w/ BARRELS OF WA~E~ (If none, so state) ed compa Luid. In., dual 2 7/ g from 53 tz'd. the @ 5315' . ass "G" ( Ran WL /8" tbg. dual hyd REMARKS (I! drilling, dept ); if ~l~ut down, cause; date and result of teat for gasoline vontent of ny tailed 8" tbg. ~0'-3970' . ;-2 Sd. Stabbed into mt. Perf. gauge ring & string as pkr. @ Installed ?V 's. :emoved 11 toprodu:tion. SS tbg., B wtr. Kil ed well,z/ 64#/cu :ailed &tes :ed BOPE & into per: cmt. w/ seal for blk. s, z. of B- red mill & ,orked t] Pulled n. pkr. assy. C Sd. ira ru tight ;OPE. .3 & B-4 Sds. . ft. WO fluid. dual 2 7/8" 5000.'. Sqz'd. wellbore n gauge ring spot @ 5083'. NoTr.--Thero were ...................................... runs or sales of oil; .............................................. M cu. ft. of gas sold; ............................................. runs or sales of gasoline during thc month. (Write "no" where applicable.) No?g.--Report on this form is required for each calendar month, regardless of the status of Ol)Crations, and must bo filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by thc supcrvi.sor. U.S. GOVERNMENT PRINTING OFFiC,[ :195~--0-729"7B4 Form 9-3'~9 892- 556 ($anuary 19,50) Form 9-33] Dec. 1973 U,~ITED STATES DEPARTMENT OF THE INTERI.OR GEOLOGICAL SURVEY SUNDRY NOTICES AND' REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use Form 9-331-C for such proposals.) 1. oil gas well [] well - ~] other 2. NAME OF OPERATOR UNION OIL COMPANY OF. CALIF, . 3. ADDRESS OF OPERATOR ...909West 9th Ave.., Anqhorage, Alaska 99501 4. LOCATION OF WELL (REPORT LOCATION CLEARLY. See space 17 below.) 404'S & 4231'E from the NW corner. AT SURFACE: Section 7: T4N, RllW, S. M. AT TOP PROD. INTERVAL: * AT TOTAL DEPTH: ** 16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA REQUEST FOR APPROVAL TO: Form Approved. [ludget Bureau No. 42-R1424 5. -~EASE ' ' A-028142 '-**: - 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENT NAME. ,. . K~nai Unit : 8. FARM OR LEASE NAME {. _. 9. WELL NO. ', ~ . KU #43-7 ,' ~;~ :: 10. HELD OR WILDCAT NAME Kenai Gas Field-Pool ~.l& 5.2 11. SEC., T., R., M., OR BLK. AND SURVEY OR AREA Secti_on 7; T4N, 'R_[I_IWj S. M. 12. COUNTY OR PARISHI 13. STATE Kenai Borough '1 AlaSka 14. APl NO. : - 50-133-10093 15. ELEVATIONS. (SHOW DF, KDB, AND WD) 78'GR SUBSEQUENT REPORT OF: TEST WATER SHUT-OFF r--] ['"] 13'"'" i ~'~, :~- *' '' FRACTURE TREAT [-I [] '" SHOOT OR ACIDIZE [] [] ':; " REPAIR WELL [] [] (NOTE: Report results of multiple completion or zone PULL OR ALTER CASING [] [] change on Form 9-330.) ~ -, ' ~ · MULTIPLE COMPLETE [] [] .* . CHANGE ZONES [] [] ABANDON* [] (other) Corer>feted turnkey rig move. ,. -. 17. DESCRIBE PROPOSED OR COMPL~YffD 0P~Y~b~S (de'ri9 ;hie all ~ea~n;~ fi~t~ils, and give pe~inent date~,' including estimated date of sta~ing any proposed work. If well is directionally drilled, give s~bsurface Io~tions and measured and true ve~ical depths for all.markers and zones peAinent to this. work.)*. 'ii; .;'.~ .~--~ DIE ~': , ,' . * 2345 S & 54 W of the surface locahon. ': '. ,--Fql EN~~~";~~~-' ** 2926'S & 53'W of the surface location. Subsurface Safety Valve: Menu. and Type · 18, I her~'~ertify thaJ~t~e~egoing is true and correct Ft. APPROVED BY CONDITIONS OF APPROVAL, IF ANY: (This space for Federal or State office use) TITLE DATE .o - ,. , - *See Instructions on Reverse Side · JUN v .., DIV!SION OF OIL AND GAS ANCHORAGE Union Oil and Gas ~.~ision- Western Region Union Oil Company .~f California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 279-7681 union .,.,... Division of Oil & Gas ~001 Porcupine Drive Anchorage, Alaska 99504 ~RE: KU ~21-6 _~~- KENAI GAS FIELD Dear Mr. Marshall: Enclosed for your approval are three (3) copies each of the required Sundry Notice & Reports on Wells for the above captioned Kenai Gas Field Workovers, Very truly yours, R Callender District Drlg. Supt. sk Encl. (9) CC: Standard Oil Co, Marathon Oil Co. Atlantic Ric,hfield Co. DIV~$tON OI= OIL~ANO GAS ANCHOI~AGI~ ,/ ~orm 10`403 REV. 1-10-73 Submit "Intentions'' In Triplicate & "Subsequent Reports" in Duplicate STATE O :LASKA OIL AND GAS CONSFRVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) 5..PI NUMERICAL CODE 6. LEASE DESIGNATION AND SERIAL NO, A-028142 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELLi ~ OTHER 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME UNION OIL COMPANY OF CALIFORNIA Kenai Unit 3. ADDRES5 OF OPERATOR 9. WELL NO. 909 West 9th Avenue, Anchorage, Alaska 99501 KU #43-7 10. FIELD AND POOL, OR WILDCAT 4. LOCATION OF WELL At surface 404'S & 4231'E from the NW corner. Section 7: T4N, RllW, S. M. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 78'GR Kenai Gas Field-Pool 5.1 & 5.2 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Section 7: T4N, RllW, S. M. 12. PERMIT NO. 65-11 14. Check Appropriate-Box To Indicate Nature of Noti.ce, Report, or Other Data NOTICE OF INTENTION TO: PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS TEST WATER SHUT-OFF FRACTURE TREAT · SHOOT OR ACIDIZE REPAIR WELL (Other) *See below SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 35. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. *To pull tubing, abandon the C-1 & C-2 Sands of Pool 6, log & perforate the B-5 Sand of Pool 5.2 and recomplete well as a dual Pool 5.1-Pool 5.2 gas producer, well KU #43-7, Kenai Gas Field. PLAN OF PROCEDURE: 1. Rig up and kill well w/ 5% KCL WO fluid. 2. Remove x-mas tre, e. Install & test BOPE. 3. Pull & lay dwn. dual 2 7/8" tbg. string & accessories. 4. CO 7 5/8" csg. to 5620'ETD. 5. Set cmt. retainer @ 5535'+_and squeeze the C-2 Sand from 5575'-5600'~ E ~ E ~ ~ ~ ~-- abandonment. 6. Set cmt. retainer @ 5300'+ and squeeze the C-1 Sand intervals from 5352'-5496' for abandonment. I~'}~'~ 0*~ 7 Run CNL-FDC Log from 5300'-4000'. .,~, ,.. , -, · · . D.I\.,;~I~.I',~ ~.i'. 01[, AND 8. Perforate the B-5 Sand w/ cased carrier guns as determined from logs. ~9. Complete well w/ dual 2 7/8" tbg. strings and return well to production. ESTIMATED RIG OPERATING TIME Twelve (12) days. *See attachment of present and proposed perforations for the short and long strings. 16. I hereby/c~rtify that the foregoing is true and correct TITLE (// 3 im t<. L;at:[ender Dist. Drlg. Supt. DATE. 4/29/75 (This space for State office use) / APPROVED BY ~' ' "r~.'' ~,-, '~ ~ ' ' ":~''j;~ ~W~.''"!?'~. TITLE CONDITIONS O~'APPROVAL, IF ANY=~' See Instructions On Reverse Side POOl/--, 5.1 5.1 5.1 5.1 5.1 POOL 6 6 6 6 POOL -=5.1' 5.1 5.1 5.1 5.1 POOL 5.2 SHORT STRING · SAND -_ B-3 Upper B-4 Middle B-4 Lower B-4 Lower B-4 ~-% INTERVAL 4691'- 4712' 4766'- 4790' 4800' - 4841' 4902'- 4924' 4928'- 4950' LONG STRING SAND Upper C-1 Lower C-1 Lower C- 1 Lower C- 1 INTERVAL 5352'- 5374' 5387'- 5428' 5431'- 5472' 5475'- 5496' 5575'- 5600' PROPOSED PRODUCTION PERFORATIONS SHORT STFdNG SAND B-5 Upper B-4 Middle B-4 Lower B-4 'Lower B-4 , , INTERVAL 4691' - 4712' 4766'- 4790' 4800' - 4841' 4902' - 492 4' 4928'- 4950' SAND . ONO rmNO · · INTERVAL 5~)40'- 5080' (estimated) FOOTA G E 21' 41' 22' 22' 130' FOOTAGE 41' 41' 21' 25' FOOTAGE 21' 24' 41' 22' 22' FOOTAGE 40' Form D-IOO1-A UNION OIL CO. OF CALIFORNIA REPAIR RECORD SHEET A PAGE NO. I KENAI UNIT .WELL NO. 43-7 LEASE FIELD Kenai Gas Field BEGAN' 9/2/74 COMPLETED: 9/20/74 PERMIT NO.. 65-11 SERIAL NO. A-028142 COMPANY E~NEE~ EAess~, Wester _ AFE #341109 ~;..~' Jim k. ~Jaiiender CASING & TUBING RECORD CONTRACTOR TYPE UNIT__ ELEVATIONS: Kenai Drilling Co. Oilwell 52T GROUND See CASING HEAD Previous TUBING HEAD ROTARY DRIVE BUSHING Report -~SI.ZE DEPTH WEi~H'T ' I' GI~ADE I I I '' ' ' ' ~EM ~K S I 20" 52' 78.6# Driven to 52' 10 3/4' 956' 32.75# H-40 Cmt'd w/ 1100 sx. Ideal Construction Cmt. 7 5/8" 5687' 26.4# J-55 Cmt'd w/575 sx Ideal Construction Cmt-last 100 sx w/2% CaCI 2 7/8" 4882'L 6.4# N-80 Dual tbg. strings. 4572'S . . . . PERFORATING RECORD DATE INTEI~VA~ ' ' ~'T ' ~' n~ S O~ ' I PnESENT coNDITION 7/1/65 4691'-4712' 5593' Productior B-3 Sd. Open for production. 7/1/65 4766'-4788' 55.93' Pr°ductior Upper B-4 Sd. Open for production. 7/1/65 4800'-4841' 5593' Productior Middle B-4 Sd. Open for production. 7/1/65 4902'-4924' 5593' Productior Lower B-4 Sd. Open for production. 7/1/65 4928'-4950' 5593' Productio~ Lower B-4 Sd. Open for production. 7/1/65 5352'-5374' 5593' Productior Upper C-1 Sd. Open for production. 7/1/65 5387'-5428' 5593' Productio~ Lower C-1 Sd. Open for production. 7/1/65 5431'-5472' 5593' Productioz Lower C-1 Sd. Open for production. 7/1/65 5475'-5496' 5593' Productioz Lower C-1 Sd. Open for production. 9/11/7,~ 5575'-5600' 5620' Productioz C-2 Sd. Open for production. 9/15/7~ 4820'-4840' 5620' Productioz Middle B-4 Sd. Open for production. 9/15/7~ .4770'-4790' 5620' Productimt Upper B-4 Sd. Open for production. 9/18/7' 5585'-5600' 5620' Productio~t C-2 Sd. Open for production. INITIAL DATE I INTERVAL NET OIL CUT GRAV. C,P, T.P. - CHOKE MCF GOR REMARKS DIVI K, lq ,,. i'; DIL ANDOAS ANCHCIRAG WELL HISTORY PRIOR TO REPAIR LAST COMPLETION NO. 2OMPLETION DATE: 10/2/68 PRODUCING INTERVAL: B-3, B-4, C-1 Sds. INITIAL PRODUCTION:_. LAST REGULAR PROD. & DATE: 10.48 mmcf/d on the Pool 5.1 10.64 mmcf/c] o~ .f]~::~ P~01 6 2UMULATIVE PRODUCTION: SS -- i 20,389,969 mcr Pool 5.1 TJ. - 19,135,445 mcr Pool 6 REASON FOR REPAIR: (3pen C-2 Sd. ~, fr~a.t C-2, C-l, T~-3 ~ ~-4 gcl.q, perfs: for scl, c~nt,-o! v.,/- - Hyd r oxy-Ah] mi mum. :Form D-1001-B UNION OIL CO. OF CALIFORNIA REPAIR RECORD SHEET B PaGe NO LEASE KENAI UNIT COMPLETION DATE:. 9/20/74 WELL NO. 43-7 FIELD Kenai Gas Field APPROVED Jim R. Callender DATE E.T.D. TYPE: C am eton DETAILS OF OPERATIONS. DESCRIPTIONS & RESULTS DEC 1 ~ tg?4 i~IV'I$1CI~I ~.F OIL AND GA: WET-i. HEAD ASSEMBLY CASING HEAD: Cameron 10" X 3M CASING HANGER: CIW AW Slips CASING SPOOL: TUBING HEAD: Cameron 10" 3000# X 8" 3000# DCB TUBING HANGER' Cameron - dual 2 7/8" split hanger 8" w/ 8rd EUE up. TUBING HEAD TOP: 8" 900 Series. MASTER VALVES: 2 2 9/16" Bore on 4" CC w/ integral tee. CHRISTMAS TREE TOP CONN.: CIW 2 1/2" slim cameron ,;IL}il biL LU ,i,1 I.I tt UJ\ L Kenai Unit I;[!LL l:u. #43-7 FIt.U) Kenai Gas Field DAIE 9/2/74 9/5/74 9/4/74 9/5/74 9/6/74 9/7/74 9/8/74 9/9/74 ,:)/10 9/11/7 5707'TD 5593'ETD 5707'TD 5593'ETD 5707'TD 5593'ETD 5707'TD 5593'ETD 5707'TD 5593'ETD 5707'TD 5593'ETD 5707'TD 5593'ETD 5307'TD 5593'ETD 5707'TD 5620'ETD 5707'TD 5620'ETD ,DF.TAILS OF ,CPERATIpI!S, DEZCR_.~jPTIe"s ~' .... .., ,., RESULTS (Footage 0') Rigged .up Schlumberger & ran Spinner Survey & Production Profile. Began turnkey rig move from KU #43-6 to KU #43-7 @ 5'01 pm; 9/2/74. (Footage 0') 24 hr. turnkey rig move. (Footage 0') Conmenced W@ operations @ 9:00 am, 9/4/74. Mixed 50 bbls of 18#/bbls. Dril-S pill & pumped 25 bbls pill in. tbs. 6 25 bbl pil in SS tbg. Opened "XO" sleeve in SS @ 5796' & circ. armulus w/ 74#/ cu. ft. W@ fluid w/ 8#/bbl Dril-S. (Footage 0'} Completed displ, tbg. & annulus w/ 74#/ cu..ft. WL fluid. Installed BPV's. Removed x-mas tree. Installed 10" SM BOPE & tested to UOCO specs. Released SS tbg. from Baker model "~' dual pkr. @ 5885'. Circ. btms. up. Pooh. Laying dwn. SS 2 7/8" tbg. (Footage 0') Pooh. Laid dwn. SS tbg. Tied into LS tbg. ~ pulled Baker ~del "~' dual pkr. free @ 3893' (corrected) Circ. btms. up on top of perm. pkr. @ 5156'. ttad gas cut mud & excessive sand on btms. up,,from 5156'. Pooh w/ LS tbg, LaYing dm. same. Had holes in blast jts. @ 4790', and from 4831' to 4856'(tbg. measurement)~Opposite B-4 Sd. perfs. Completed laying dwn., 2 7/8" LS tbg. PU 7 5/8" BO shoe #1 & pkr. picker. (Footage 0') Completed PU 3 1/2" DP. Tagged Baker Model N-1 perm. pkr. (7 5~:~" X 3 1/4") @ 5156 WI31 or S158'DPM. Milled on pkr. w/ BO shoe 4 hrs. Pooh. No indication 'of wear on BO ghoe. Shortened stab-in stinger 58" ~ re- ran BO shoe #1. Ran 2 hrs. on pkr. Pooh. .No indication of wear on BO shoe. Reran BO shoe #1. Spudded on pkr. to wedge top section from spinning. · · (Footage. 0') BO Baker Model N-1 perm. pkr. @ 5156'. Pulled 3 stds. & hung up @ 4960'. Pooh. Rec. top section of pkr, Reran BO shoe. Tagged pkr. @ 4960'. BO pkr. [ Pooh. Rec. all of pkr. Ran 6 1/2" skirt OS w/ 2" grapples to catch tbg. gun @ 5571'. Hole bridged @ 5200' w/ sand. CO Bridge & washed dwn. to firm bridge @ 5444'. Unable to CO bridge w/ OS & lip guid. Pooh w/ OS.. Picked saw-tooth roatry shoe up on BOwen basket & 25' of 6" WP. (Footage 0') Completed Tilt w/ Bowen JB & RS. Drlg. out bridge @ 5444' & CO to ETD @ 5595'. Circ. btms. up & Pooh. Ran 4 11/16" OD OS w/2" grapples, tagged up on toFof tbg. gun @ ,5571' ~ latched onto same. Pooh. Rec. 22' of tbg. perf. gun. Ran 5 1/2" Saw,-tooth RS on Bowen dB. Till to 5593'ETD., Cored over junk in hole (hammer) to 5607'. Pooh. No rec. (Footage 0') Reran Saw-tooth Rot@r7 Shoe on Bowen JB w/ 25' extention. Cored over junk from 5607' to 5620'. Pooh. No rec. ,Ran 6 5/8" bit 7 5/8" csg. scraper. CO to junk on cmt. plug @ ETD of 5620'. Pooh. PU 7 5/8" test tool on 5 1/2" DP. TIH to 5600'. (Footage 0') Displ. well w/ 64# 5% KCL fluid. PU[ set 7 5/8" test tool @ 5550' Displ. fluid in DP w/ 1S00 psi gas press. Bleed DP press, off to 1000 psi tgtal }~I on C-.2 Zone. RU Schlumberger [ ran 2" OD thru tbg. Hyper-Jet II perf. gun in tendem 20' + 5'- gun. Positioned gun .to fire from 5575' to 5600' Fired btm. 5' gun from 5595' to 5600'. }tad no indication of firing on 201 gun from 5575' to 5595'. Press. increased 200 psi in 10 mins. Unloaded well w/ limited entry. Pooh w/ perf. gun 5' gun hung up in Savor Sub below control head @ rot@rT. Released pkr. ~ displ, well w/ 64# W@ fluid. Removed gun from control head. Re-ran 20"2" OD llyper-Jet perf. gun positioned from 5575' to 5595'. Displ. fluid in DP w/ 1000 psi gas. Set test tool w/ 5550' [ bleed gas press, ofr~ [~offi fi~i~ t..dt .~t/lthon c-2 Zone. , , Perf. C-2 Sd. from 5575 to 5595 . Blewl~.~~~r~}o~te~ ~tr. Pooh w/ Schlumberger. ,' NO GA'-; t'AC, E il ,, LEA L Kenai Unit IiLL I lU, //43-7 F ILU) Kenai Gas Field 9/12/74 5707'TD 5620'ETD 9/15/74: 5707'TD 5620'ETD 9/14/74 5707'TD 5620'ETD 9ilS~ 5707'1'9 5620 ' ETD 5707'TD · 5620'ETD 9/17/ 5707'TD 562 O' ETD /18/74 5707'TD 5620 'ETD )/19/7z 5707'TD 5620'ETD DETAILS OF CPEPATi~!e;'S ~ RE_SJ4LT_S (Footage 0') Pooh w/ Schlumberger perf. gun. Ran (North Star) slick line press, bomb ~ positiQned @ 5525' (25' inside DP) Opened well to test the C-2 Sd. perfs, from 5575' to 5600' @ 1:30 am. Put well into test separator @ 1:45 am.' Tested C-2 Sd. 2 hrs. @ stabilized rate of 3.1'mmcf/d on 3/8" choke w/ 1076 psi surface press. (t279 psi BI-~) SI well 4 hrs. for BHP press, build-up. Surface SI press. 1509 psi (1676 psi gl~). }lowco man closed valve on control head ~ cut }fL. RU-Fished WL ~ press, bomb out of hole.' RU tlo~o to treat-C~2 Sd. perfs from 5575' to 5600' w/ t-lydroxy- Aluminum; Pumped 1000 gallons 15% ttCL,2200 gallons 5% KCL, 5000 gallons t~droxy'Alumin'um [ 3200 gallons 54 KCL. Broke dwn. rm. w/ 1700 psi. PI acid 4 cfm @ 1200 psi. Remainder of treatment 4 cfm @ 1200 psi (Had indica- tions @ last of job that test tool had slight leak-by). Job completed @ 11:50 pm-Unable to reset ~ test.tool. (Footage 0') Pooh w/ test tool. B{ade bit ~ scraper trip .to 5618'. Tilt w/ 7 5/8" RBP ~ fullbore pkr. (Footage 0') Tested for communication between C-2 perfs fi Lower C-1 perfs. tk~d slight communication @ 1200 psi. Straddled Lower C-1 perfs, w/ RBP @ SS50' ~ pkr. @ 5580'. Broke dwn. Lower C-1 perfs w/ 6 cfm W 1000 psi. Displ. 15% ltCL'acid to perfs. Fluid broke around 'to l~per C-1 perfs. @ 5552' to S574'. Reset pkr. @ 5559'. .Simultaneously treated the Iyper C-1 Sds. ~ Lower C-1 Sds. w/$800 gal. 15% I-ICL, 12,000 gals. 5% KCL, 26,200 gals. Iydroxy-Aluminum ~ 15,800 gals. 5% KCL. Pooh w/ RBP fi pkr. , (Foot'age 0'). Reperfed B-4 Sd. w/ 4" csg. gun @ 4 hpf from 4820' to 4840' [ from 4770' to 4790'. TIH w/ 7 S/8" RBP ~ fullbore Pkr. Set RBP @ 5065' [ pkr. @ 4-81'. Broke dwo. Lower B-4 perfs from 4902' to 4950' w/ 1900 psi ~ Pumped @ 2 cu. ft./min, w/ 1000 psi. Pumped 1200 gals. 15% ttCL fi 1S00 gals. of S% KCL. Fluid broke around to middle B-4 perfs @ 4800' to '4841' Reset pkr. @ 4796'. Ihznped 12 cu. ft. Fluid broke around to Upper B-4 ~erfs from 4Z664[ to 4788'. Reset pkr. @ 4756'. Simultaneously treated total B-4 perfs w/ 2700 gals. 154 ItCL, 7800 gals. S% KCL, 19,500 gals. ltydroxy- Aluminum ~ 11,800 gals. 54 KCL. (Footage 0') Completed ttydroxy-Alumin.um treatment of the B-4 Sds. Retrieved BP [ reset @ 4750' Unable to test BP. Pooh..RIH w/ 7 S/8" BP [ fullbore pkr. Set BP. @ 47~7' [ pkr. @ 4661' Unable to break dwn. B-5 perfs from 4691' to 4712'. Spotted 420 gals. 1~% HCL, across perfs. Broke dwn. B-3 Sd. w/ 1400 psi ~ pumped in @ 7 1/2 cfm. w/ 850 psi.' Treated the B-3 Sd. w/ 900 gals. 15% IICL, 1700 gals. of 54 KCL, 4400 gals. of ltydroxy-Aluminum [ 2600 gals. of S% KCL. Retrieved BP. (Footage 0') Po@ti w/' test tooI [ RBP after Hydroxy-Aluminum treatment of B-5 Sd..perfs from 4691' to 4712' RU.Schlumberger. Ran 4" OD Hyperjet II csg. gun. Unable to get below S5~6'. Perf. top 10' of C-2 Sd. from 5575' to S585'. -Ran 6 5/8" bit [ csg. scraper to ETD @ S620'. No fill in hole. (Footage 0') Circ. btms. up, Pooh. RU Schlumberger. Rill w/ 4" OD }¥perjet I'I csg.'gun [ reperf, the C-2 Sd. from 5585' to 5600' @ 4 hpf. Ran .6 set Baker 7 5/8" X 5 1/4" Hodel "D" perm. pkr. @ S155;~q94. RII! w/ 5 1/4" seal assy. on 3 1/2" DP. Tagged pkr. @ S157'DPM. Stabbed into perm. pkr. ~ press, tested to 850 psi-ok. Pooh. Laid dwn. 5 1/2" DP ~ DC. RU to run tbg. (Footage 0') Completed running dual 2 7/8" tbg. strings. Stabbed into perm. pkr. (Baker Model "D") @ 5155' '[ tested w/ 850 psi. Spaced out tbg. Set plug in SS "N"' nipple @ 4617'. Set BOT 7 S/8" X 2 7/8" X 2 7/8" NS-2 hyd. pkr. w/ 3500 psi @ 4598' [ tested. Installed BPV. .,It)il L, IL LU,t'," d' ,l' ' L[J\SL Kenai Unit #43-7 FIt_U) Kenai Gas Field 9/20/74 S707'TD 562 0 ~ ETD D_E_TAILS OF OPEPATiOIiS,:_ DE~_C. RIPTIO;'S ,.,~ RESU[_TS (Footage 0') Removed BOPE. Installed x-mas tree [ tested to 3000 psi-ok. Displ. WO fluid w/ inhibited pkr. fluid. Displ. tbg. strings w/ gas fi closed sleeves. . Pd~LI~SED RIG @ S-00 pm, 9/20/74. DAGE I'b, UNIOI,I OIL Ctff ANY OF CALIFORNI^ t ECOt® LEASE KENAI UNIT I'£LL N0, 4B-7 FI[U] Kenai Gas Field ItATE ETD JTS. 11 135 2 157 Jts. DETAILS OF OPERATIONS, DESCRIPTIOt. IS g RESUI_TS TUBING DETAIL LONG ST]RING DESCRIPTION LENGTH BOTTOM TOP Mule Shoe 1.16 5]79.56 5178.40 2 7/8" N Nipple ID-2,205, OD-3.25 1.35 5178.40 5177.05 2 7/8" N-80 6.4# EUE 8rd Pups 10.11 5177.05 5166.94 Seal Assy. 9.70 5166.94 5157.24 Baker 7 5/8" X 3 1/4" Model "D" Perm. Pkr. set (a WLM 5]_56' Locator Sub Otis "XO" sleeve ID-2,313, ©D-3.75 2 7/8" N-80 6.4# EUE 8rd Pup 2 7/8" N-80 6.4# EUE 8rd Blast its. OD 3.68 2 7/8" N-80 6.4# EUE 8rd Pup 2 7/8" N-80 6.4# EUE 8rd Pup Blast jts. OD 3.68 2 7/8" N-80 6.4# EUE 8rd Pup 2 7/8" N-80 6.4# EUE 8rd Blast its. OD 3.68 2 7/8" N-80 6.4# EUE 8rd .64 3 00 4.O6 189 63 60 04 10 21 31 82 97 14 8 09 30 47 50 82 62 32 "X-Over." 2 7/8" EUE 8rd X 2 7/8" Butt. 1 22 BOT Husky Dual Pkr. 7 5/8" X 2 7/8" X 2 3/8" 6 58 "X-Over" 2 7/8" Butt. X 2 7/8" EUE 8rd 1 45 2 7/8" N-80 6.4# EUE 8rd 31 8] Otis "XO" Sleeve ID-2.313, OD-3.75 3 04 2 7/8" N-80 6.4# EUE 8rd 346 01 "X-Over" 2 7/8" EUE 8rd X 2 7/8" Butt. 1 45 2 7/8" N-80 6.4# Butt. Tbg. 4190 08 2 7/8" N-80 Butt. Pups. ].4.16 Cameron Split Hanger ]..00 Elevation 12.20 5157 24 5156 60 5].53 60 5149 54 4959 91 4899 87 4889 66 4857 84 4760 70 4752 61 4722 14 4671 32 4609 0h 5156.60 5153.60 5149.54 4959.9] 4899.87 4889.66 4857.84 4760 70 4752 6] 4722 14 4671 32 4609 00 4607 78 4607 78 460]. 20 4599 75 4567 94 4564 90 4218 89 4217 44 27 36 13 20 I 50 4601 20 4599 75 4567 94 4564 90 4218 89 4217 44 27 36 13 20 12 20 ]_3 70 BOT HD-2 7 5/8" X 2 7/8" X 2 7/8" pkr. set w/ hanger 1.50' high tbg. landed in compression. 135 jts. 2 7/8" Buttress N-80 6.4# 22 jts. 2 7/8" EUE 8rd N-80 6.4# St II:.L'I 1) P^6E UNION OIL C(]tPANY OF CALIFOP ' IA $' LL I ECORD ~E KENAI UNIT I'~_LL NO, 43-7 FIELD Kenai Gas Field DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS JTS. 145 1 149 Jts. TUBING DETAIl, SHORT STRING DESCRIPTION LENGTH B~')TTOM TOP 2 3/8" EUE 8rd N Nipple ]..41 2 3/8" 4.6# EUE 8rd Pup 9.44 "X-Over" 2 3/8" EUE 8rd X 2 3/8" Butt. .7] EOT-H-2 7 5/8" X 2 7/8" X 2 3/8" pkr. BOT-J Latch & "X-Over" 2 3/8" Butt. X 2 7/8" Butt. 2 7/8" N-80 6.4# Butt. Tbg. Otis "X©" Sleeve 2.313 X 3.75 OD 2 7/8" N-80 6.4~ Butt. Tbg. 2 7/8" 6.4# N-80 Butt. Pup Cameron Split Tbg. Hanger Elevation 6.58 2.62 62.17 3.34 4509.72 10.]5 1.00 12.20 4619.34 4617.93 4617.93 4608.49 4608.49 4607.78 4607.78 460].20 4601.20 4598 58 4536 41 4533 07 23 35 13 20 ] 50 4598.58 4536.4] 4533.07 23.35 13.20 12.20 13.70 Brown H-2 7 5/8" X 2-7/8" X 2 3/8" Pkr. set w/ tbg. hangers 1.50~ above tbg. head. Tbg. landed in compression. 147 jts. 2 7/8" N-80 6.4# Butt. Tbg. DIVI~/ON O,': OIL AND OAS ANCflOR^GF, WORKOVER SUSDt~RY KU 45-7 AFE N~JHBER · TOTAL COST: TOTAL SPENT: 341109 $257,400 $158,].41 PURPOSE' Clean out sand fill,-perforate C-2, treat Pool 6 (C-1 ~ C-2 sands} and Pool S.1. {B-3 ~ B-4 sands) for sand control. SUI~BfARY OF RESULTS' The sand consolidation treatment of'the B-3 and B-4 sands of Pool 5.1 was successful in eliminating sand production. The producing rate fro~ Pool $.I prior to the workover was about 11 mmcf/d. The rate during September averaged 8 mmcf/d but daily tests during October were as high as 11.8 nuncf/d. The hydroxy-aluminum treatment appeared to cause no deliverability damage to the B-5 and B-4 sands in KU 45-7. The sand consolidation and perforation of the C-2 sand of Pool 6 resulted in no sand-production but 125 BWPD and inconclusive gas production increase. The producing rate prior to the work- over was about i0 mmcf/d. Following ~,ze workover the gas pro- duc'tion increased from 5.3 to 10,8 mmcf/d between September 29 to October 20. The test rates on October 21 and Z? were 7.5 mmcf/d with 126 BWPD and 11.96 mmcf/d with 125 BWPD respectively No significant loss in gas deliverability resulted front the workover and continued cleanup may result in a deliverability increase. The 15% HCU acid used-in the sand consolidation pre- flush may have resulted in a channel to a water sand and water production of 125 BPD. The production test of the C-2 sand produced no water. SUMb~ARY OF WORKOVER After cleaning out the sand fill, the C-2 sand of Pool 6 was perforated thru drill pipe from 5575'-56Q0'. A test of this interval produced 3.1 mmcf/d against a 1080 psi surface pressure. The C-1 (5352'-5496'} and the C-2 (5575'-5600') were treated with hydroxy-aluminum for sand control. The preflush of this treatment included 15% HCL. The C-2 sand was reperforated with casing guns. The blast joints in Pool 5.1 were sand cut. The B-5 and B-4 sands were treated with hydroxy-a!uminum for sand control. The preflush included 15% HCL. DEC 1 1 197,.1 DIVISION OF OIL AND ANCHORAGE - I I I I i ii1'~ iiii iii / II I~lll ~ I II I I I II iii · · - ' "'"' ---~:" ' - , .... --,.. ~ RT 0' - . · .-:~ :. ' "':'-' "-. "~' ":' : ".~"--"1"11---' ""r"~ ' .' Tbg. Hgt. 13.70' ' '; :.'2 :/8" E5 Sleeve ~ 4533' ID 2',313. :' ' l' Il' : "2 3/8" Butt. X 2'7/8" Butt. ~599', ". ! II-' '.,~D. 2 3/8"'NNippl~'Btm. ~6'19' ID1:79~i ii ' ,~ 20" 78.6~Cs~. ~52'. ' 3" Blast'Jts. ~671'-4722'. ':' :::-~:-::" i Ii ' I t. s~:~:~.:~:~. ~::::,. -' :::-::::':-- III "1 . ~:. ::-v~" ~ ~:~:~'~ :,~,. m-:.:o::: ·- I Ii ~-: I ~ · .. · . ] .. · _-..:. _., . . - .:.:-...::.:~.. :- i ' . - - · ' . - . - . ' . ' ' ' z ' "' ' ] II , '' ' ' "'.". . ' " -"' '"' ~ .- ' ' : J1:~10.3/4 ~.75~H-40C88. ~.956~. . ' ' ' - ".: ' '.." C ' Pkr. ~601'. rD 5707' "'~"~"~ ' ~ ' .- ' ~~ 7 7 5/8" X 3 1/4" Baker Mdl. "D" Perm. 8 Pkr .. ' '' .' ' ':-:~ J 10 ~ 7 5/8" 26.4~J-55Csg. ~5687,. . --~.-{- OATf '" ' ..................... ,, ~ J . ,~ ' COMPLETION SCHEMATIG WO ~2 i.'o. , , KU ~43-7 _-- _ _{ _. _. ' . OA~ . _ ~__ _ '--.- Began 9/2/74 Completed 9/20/74 ...... --_. ........ ............ UNION OIL COMPANY OF CALI~NIA s~s ~ i i i iJ .......... i ii i ii .... 'r FORM 247 (NE. Vd 5/66) DATE 9/27 - 9/29 10/2 lO73 10/21 10/22 10/27 PRODUCTION TEST AFTER WORKOVER KU 43-7 ' POOL I ICF/D 7.24 8.42 -9.14 11.80 9.14 ,,,., ~I 8.63 5.1 BI%'PD MMCF/D I I I I --- 5.32 -- 6.19 -- 8.98 -= 10.78 -- 7 .S0 -- 9.60 -- 11.64 POOL 6 MONTH JANUARY FEBRUARY l~CH APRIL PRODUCTION SUMMARY POOL 5.1 B~vlCF/D 11.47 9.72 10.33 · . 11.87 POOL 6 MMCF/D 13.35 11.43 11.89 8.56 MAY 10.76 9.42 JUNE 11.54 JULY 11.98 AUGUST 10.48 WORKOVER 9-2-74 SEPTEMBER 7.98 TO 10.45 10.28 10.64 9-20-74 7.79 BWPD I I I I I I I I I I 126 10- 29-74 {GAG) DIVI$1u.i-~ r C, ll, t.N~ OAS Union Oil and Gas Division: Western Region Union Oil Company ~'"qalifornia 909 W. 9th Avenue, As,chorage, Alaska 99501 Telephone: (907) 279-7681 October 2, 1974 Mr. Rodney Smith Regional Oil & Gas Supervisor Conservation Division U. S. Geological Survey P. O. Box 259 Anchorage, Alaska 99501 RE: KU #43-7 KU #14-6 KENAI GAS FIELD Dear Mr. Smith: Enclosed for your files are copies of the Sundry Notices & Reports on Wells for KU #43-7 and the Lessee's Monthly Report of Operations for KU #43-7 & #14-6, Kenai Gas Field. sk Encl. (9) cc: Mr. T. Marshall-State~/ Marathon Arco Socal Very truly yours, D. A. Johnson Drlg. Engineer Form ~-351 (May 19611 ) ,.,,.__..___.._nlrPA~'l'f-'rNT O <Other F THE INTERIOR ver..de) GEOLOGICAL SURVEY SUNDRY' NOTICES AND 'REPORTS ON WELLS (Do not use this form for proposals to drUl or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such propo~mls.) 1. air, -D GAS ~ WELL WELL OTHER NAME aP OPERATOR UNION OIL COMPANY OF CALIFORNIA ADDKEBS OF OPERATOR ~. 909 West 9th Avenue, Anchorage, Alaska 99501 LOCATION OF ~VZLL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At st~rfaee 404'S & 4231'E from the NW corner· Section 7: T4N, RllW, SM. 14. PZa,~lZT NO. [ 15. EmVA~ONS (Show whether DF, ~r, G~, etc.) 65-11 [ 7g'C,R 16. Form approved. Budget Bureau No. 42-R1424. LEASE DESIGNATION AND 81~RIAL NO. A-028142 IF INDIAN, ALLOTTEE OR TRIBE NAME · UNIT AGREEMENT NA~E '.-; Kenai Unit- Ch~k Appropriate Box To Indicate Nature of Notice, Report, or Other Data* NOTICE OF IN'~N~ION ~: BUBSEQUENT REPORT FRACTURE TREAT MULTIPLE COMPI,ETl~'' ~RAC~URI~ TREATMENT ~r. TEBINC. CASING SHOOT OR ACIDIZE ' ABANDON* 8H~TING OR AC~IZING ABA~DONM REPAIR WELL CHANG~ PLANS (O~er) (No~E: Report results of multiple completion on Well (Other) Completion or Recomptetton Report and ~g form.) 17. ozscal~g rnoPosgo 0R COMPL~TEO 0PgRATION8 (Clearly state all ~rtineut details, and give pertinent dates, including estimated date of s~rting pro~ work If well ~ di~on~y ~, give a~~ ~ons and meas~{red and true vertic~ depths for ~11 markers and zones ~rti- i · . 5. 6. 7. 0 9. 10. 11. 12: RIG RELEASED @ 5:00 pm, 9/20/74. 18.1 hereby ce~ that the. fo~oin~ue ~ co~t . (This spaceL)fsr ~derA ~o~l~rr~ffi--~'sef ~ nent to this work.) * · .~gge up a ..... d well w/ 70v/cu. e+. KCL salt wtr. Removed x-mas tree. Installed & tested BOPE. Released dual mechanical snap set pkr. 0 3893~ Pulled tbg. strings & accessories. ~ : ..... ~ ~ Milled over & retrieved single perm. pkr. ~ 5156' , -. CO sd. fill in 7 5/8" csg. to 5593'ETD. Drlg. out cmt. plug ~ .... Displ. well w/ 64~ 5% KCL fluid. ~ .:; 5 --. ~ :~ Thru tbg. perforated the Pool 6 C-2 Sd. from 5575' to 5600' & production...te~ted' (As per verbal agreement w/ Bill Wunnicke w/ USGS ~ John Miller w/~ State Division of Oil & Gas). '= ~ :') ~. ~ k .. Treated Pool 6 C-2 ~ C-1 Sds. perfs for sd. control w/ Hydroxy2'~tu~inu~ Reperforated the Pool 5.1 B-4 Sd. from 4820~ to 4840~ · from 4770~ to 4790~.. Treated the Pool 5.1 B-3 Sd. ~ B-4 Sd. perfs for sd. control w/~:Nydroxy'~A'lu Reperforated the Pool 6 C-2 Sd. from 5575~ to 5600 Recompleted the well as a dual gas well. Upper Completion~Pool: Lower Completion~~:~ '. : - Dist, Drlg. APPROVED BY CONDITIONS 0P APPROVAL, IF ANY: TITLE *See Inductions on Reverse Side UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY LESSEE'S MONTHLY REPORT OF OPERATIONS Kenai Borough Kenai Gas Field 'State Alaska County .................................... Field ............................................................... The followin~ is a correct report of operations and production (inel~din~ drillin~ and prod~cin~ wells) for the~month of ...... _S__e_ip_t_.e_~_b_.e_.r._ ............... ,19._.7..4, .......................................................................... )l~ent's address 909 West 9th Avenue Company LI&IION OIL CO OF_ C,~_A~_IF .......... :- ..... : ........ .... :. ...... ...... ........... Phone .................. 2_7_~:.7__6__8__l__Ext, 445 vt ent's title Dist Drlg. S'-u t .............................................. ~ ............ .. .................. P___: ................. S~C. AND D~Yz CU. FT. OF OAS GALLONS OF BARRELS OF RE~fARKS ~ OF ~ ~P, RANGE WE~ BAR~ OF O~ ORA~Y OASOLINg WATER (If (I[ ddlli~, depth; if shut down. cs~e: NO. PaODUC~D (~ tho~n~) date ~d r~ult of t~t for g~l~o RECOVERED none, so state)con.at of Comm~ncel W( op~ratioi,s q3-~ 3:01 pm, 9/2/74.. Displ. tnnulus w/ 74~/ c:lt. ft W[ fluid. I:tSt~~.emoved x-mas tree Installed BOPE ~ :ested to 3( 00 isl. Pulle~ .& laid d, rn. 2 7/8" SS. Picked ~tp & relelased dual hyd. ~kr. 6 389'.~~. ?ull(d & l~id dwn. IS. ~icked up 5 1/2" Df w/ BO mill & pkr. )icker M:lled ove] & retrieved pe:'m; p~kr. ~ 5156 . RIH v'/ rotary shoe. CO ~d. br.dge ~ 5~00~ ~ ~ 5~00~. Was}ed d~m. to top of tbg. jun fish ~ 5571~. ~ashec over grn to 5593~ETD. Pooh. RIt w/ OS. Latched onto risk ~ 5571.~. ?ooh. Rec. ail of ~2~ tbl . gun. ~IH w~ rotary shoe on JB. Cored over junk [hamm.~'-) +,-.~ 5~,' to 51~07~. Poe], ~ ~ ~+~'~,, ~h~ on JB C(.red over unk fl om ~ to ~,620~.~ Pooh. No rec RIH w/ 6 5/8" bit & 7 5/~" csg. scraper t CO t) 56:'.0'E~D. RIH ~/ 7 5/8" :est t(~ols to 560('. Disp.. well u / 64g KCL 2uid. PU ~ se[ 7 5/8" t~st tool ~ ff550~. Displ. flt[id in DF w/ 150( psi gas. 31eed :as ,ff tc 1000 psi. Thru tbg. dif[erentially perfed t]~e C-2 S ~. from 5575~ :o 560(~. ()pened t(>ol ~ tested C-2 Sd. t~r 2 hrs, ~ a stabilized rat, of 3.1 MMCF/D ~/ 1081 ps: surface press;. SI well for 4 hrs. Surface pre~ s. 1509 psi on DWT. RU lowco T~'eatel th{ C-2 Sd. w/ 1000 ga. of 15~ HCL, 2200 gal. of 5~ KCL, 5000 gal )f Hyd:oxy-Alu:ninum ~ 2200 gal of 5~ K(;L for sd. control. Pooh w/ test tools. ~ade kit ~ scraper :rip t~ 5618~. 5'IH w/ 7 5/8" R]~P & full'~ore pkr. Treated the ~-1 Scs. u'/ 3800 gal 15~ HCL, 12,000 g~al 5~ KCL, 26,200 [,,al Hydrr~xy-Aluminum L5,800 gal 5~ KCL for sd. control. Pooh w/ RBP & pkr. Reperfed :he B-4 Sd. v/ 4" :sg. guns ~ ~ hpf from 4770~ to 4~'90~. TIH w/ 7 5/8" RBP & RTTS. ~tradd[ed ~ rte:Ired the B-4 Sd. w/ 2700 gal 15~ HCL, 7800 gal 5~ K2L, 19,500 lydro>:y-A]umirmm ~ 11,~00 gal of 5~ KCL. Pooh ~,/ RBP & pkr. C eran RBP & )kr. Spotled 420 gal of 15~ HCL a{:ross the B-3 p~rfs, fron 4691~ t(~ 4712'. ~tradd[.ed ~ tree,ted the B-3 Sd w/ 900 ~:al of 15~ f ICL, 170~) gal of 5~ KCL, 1400 g;~ls of Hydrox/-Aluminum ~ 2~00 g~ls of 5~ K EL. Pooh w/ RBP ~ pkr. TIH ~/ 4" csg.i gun ~ r eperf~d the C-2 Sd. from 5575~ :o 5600*. Ran ~ ~et 7 5/8" X ~ 1/4" per~n, p~r. ~ 515ff,~WLM. R~n du~:l 2 7/8" tt.g. strin[s. Located on perm. )kr. set :;et BC T 7 5/8" 'C 2 7,8" X 2 7/:" hyd. 0 4 98' tested... I / / No,r~..--There were ...................................... runs or sales of oil; ............................................. M cu. ft. of gas sold; ............................................. runs or sales of gasoline during the month. (Write "no" where applicable.) NoT~..--Report on this forin is required for each calendar month, rcgardle, ss of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9-329 (January 1950) $92-~56 U.S. GOVERNMENT PRINTING Of F~Ci LES. SEE'S MONTHLy REPOR~ OF OPERATIONS · --2-- September 1974 Displ., WO fluid w/ 1.0%-NalCo N-55C pkr. fluid. Installed BPV. Removed x-mas tree. Tested to' 3000 psi-ok. RIG RELEASED @ 5:00 pm, 9/20/74. Union Oil and Gas Division' Western Heg~on Union Oil Compan3"~"California 909 W. 9th Avenue, ~)chorage, Alaska 99501 Telephone: (907) 279-7681 September 17, 1974 Mr. Rodney Smith Regional Oil ~ Gas Supv. Cdnservation Division U o S. Geological Survey P. O. Box 259 Anchorage, Alaska 99501 FILE~ -- i i i H , RE: KU #43-7 tuNA! C~S FIELD Dear Mr, Smith: Fmclosed for your approval are three (3) copies of the Amended 'Plan of Procedure for NJ #43-7; Kenai Gas Field. Very truly yours, Callender District Drlg. Supt. sk ~ncl. (3) cc: '~hrathon Socal f Arco John Miller w/ Division of Oil ~ Gas SEP 1 9 I974 DIVISION Oi;' OIL AND GAS ANCHORAGE Form 9-,,'12,1 (~y 196.3) UNITED STATES sU~mT m ~RzPUeA~. (Other instructions on re- DEPARTI~'NT OF THE INTERIOR v~,,e.ide) ~-~ G~. )LOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for prop~.~als to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) 1. WELL WELL OTHER 2. NAME OF OPERATOR UNION 0IL CGx'[P~IY OF CALIF0thNIA ~. ADDRESS OF OPERATOR 909 West 9th Avenue, Anchorage, Alaska 99501 4, LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At surface 404'S ~ 4231'E from the NW. comer. Section 7: T4N, RllW, S. M. 14. PERMIT NO. 16. 65-11 Form approved. Budget Bureau No. 42-R1424. ~. LEASE DESIGNATION AND 8EItIAL NO. ~ A___~- 028142 *.(~. IF INDIAN, ALLOTTEE OR TRIBE NAME · ,. !._7. UNIT AGReEMeNT NAME : 'KCnai Unit 8. FARM OR LEASE NAMin, WELL NO. · .'KII #43-7 *'10. FIELD AND POOL, OR WILDCAT ~nai Ca.~'lqald (5:! ~ 6) 11, Sine., T., R., M., Oa ELK. AND SURVEY OR AR~A ""SeCtion 7: .T4N, RllW, 15. ELEVATIONS (Show whether DF, RT, GR, et~) 78 ' GR, . Check Appropriate Box To Indicate Nature of Notice, Report, or Otl~er'DOta J NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASINO FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON' REPAm WELL CHANGE PLANS (Other) ,.12. C.OU. NT¥ 0a PARISaI 13. STATE .Kenaii~erin. I Alaska SURSEqU~,T aEPOaT o~.: WATER SHUT-OFF ' REPAIRING WELL FRACTURE TREATMENT ALTERIN~ CASING SHOOTING OR ACIDIZIN~ ABANDONMENT* (Other) (NOTE: Report"results of multiple completion on Well Completion or Recompletion Report and Log form.) 17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. If well is directionaJly drilled, give subsurface locations and measured and true vertical.depths for all markers and zones perU- nen~ to this work.) * ~ _: . .. - .'~ . ~ ,.,.. . f .. 21 '::' '.' ~ ' ,' ~ .!-~..::-: ,~ ..; .':,.: 1. Rig up & kill well w/ 70#/cu. ft. KCL salt wtr. -~; '~ .~,'.'. · ;' 0 .~ .' 2. Remove x-mas tree. Install & test BOPE. ~ ;"'-:' '- -:' ' 3. Release dual mechanical snap set pkr, @ $895'. Pull ~ 1ay d~a.: 'dual!. z( 7/8'" tbg. strings ~ accessories. < q ':-..: :; :~: . 4, Mill over ~ retrieve single pem. pkr. @ 5156'. ~ :'?:";:.~-.. . " ~ :' "":' 5. CO sd. fill in 7 5/8" csg. to $595'ETD. Drlg. out c~t. plu~!i t°` 5620'ETD. .. 6. Displ. well w/ 64# 5% KCL fluid. .,! . ..~ -. 7. Thru tbg. perforate the Pool 6 C-2 Sd. from 5575~ to 5600' '6 production test. (As per verbal agreement w/ Bill lt~mnick.e w/ USGS ~ John Miller w/ State Division of Oil & Gas ). ",;.;., · . 8, Treat Pool 6 C-2 ~ C-1 Sds, peris for sd, control w/ t{ydro~y-Altainum,. · 9. Reperf. Pool 5.1 B-4 Sd. from 4820' to 4840' & from 4770' to' 4790' 10. Treat Pool 5.1 B-3 Sd. & B-4 Sd. purls, for sd. control w/ }{ydroxy'Al%~ninum. 11. Reperf. the Pool 6 C-2 Sd. from 5575' to 5600' using 4" OD csg. gun. 12. Recomplete the well as a dual gas well. Upper Completion Pool 5.1 B,3 & B-4 Sds. Lower Completion Pool'6' .C-1 & C-2 Sds. ~;.:":' :. -' ':v: .--- . . 18. I hereby ~y that t~forDng is true and correct TITLE District Drlg. Supt. (This space for Federal or State olIice use) APPROVED BY CONDITIONS OF APPROVAL, I1~ ANY: TITLE *See Instructions on Reverse Side ' :' :" $EPq 9:I974 DIVISION 0i: OIL INI)' A$ ANgl{ORAC,£ Form 9-331 AMay .1963) UNITED STATES SUBMIT IN TRIPLICATE* (Other tnstrus$ion2 on DEPART'~ENT OF THE iNTERIOR ,er~e.~d.) .., ~'©LOG ICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such propo~mls.) Form approved. Budget Bureau No. 42-R1424. DESIGNATION AND ~galIL A-028142 6..IF INDIAN, ALLOTTEF~ OR TRIBE NAME ._ 7. UNIT AOREEMENT NAME O,L ~ ~.,~ ~ OTHER renai L~it WELL w ELL NAME OF OPERATOR 8. ~ARM OR L~A~E NA~E ~ION OIL C05~ OF ~IFO~4L5 ~DDBE88 O~ OP~&TO~ 909 We~t 9th Avenue, Anchorage, Alaska 99501 4. ~T~ ~.~ -W~LL (Report location c-~-~rly and m accordance with any State re~luirements.* See also space 17 below.) At surface 404'S & 4231'E from the Nq~' corner. Section 7' T4N, RllW, S. M. 14. PERMIT NO. 65-11 15. ~-,-~.w.r~oNs (Show whether ur, WE, o~, etc.) 78'GR. 9. WELL NO. k~3 #43-Z__ '~oc 10. ~~o ~oo~ oa Kenai Gas~Field. 11. SEC., T., a., M., OR BLK. AND SURVEY 0B AILEA Section 7' T4N, Rll;f, 12. COUNTY OR P~isa{ 13, S:ATE Kenai Penn. I Alaska 16. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~-~ FRACTURE TREAT SHOOT OR ACIDIZE BEPAIR WELL (Other) See Below* PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS slUBSEQUENT REPORT OF: . WATER SHUT-OFF REPAIRING WELL FRACTURE TREATMENT ' ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on WeN Completion or Recomplet!on Report and Log form.) 17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, give -~ubsurface locations and measured and true vertical depths for all markers and zones perti- nent to this work.) * PLaN OF PROCEDURE: - 1. Rig~up & kill well w/ 70#/ cu. ft. KCL salt water. 2, Ren~ve x-mas tree, Install & test BOPE. 3, Release dual mechanical snap set pkr, @ 3893', Pull & lay' d~, duaI'[W/8" ~ .. . tbg, strings and accessories, .: -. .... (- .. 4, Mill over & retrieve single permanent pkr, @ 5156', .- . $. CO sad fill in 7 5/8" csg, to 5593'ETD, .." ' - 6, TIH w/ 7 5/8" RTrs tool & set above the C-1 Sand perforations @ +5300'; Treat the C-1 Sand ~erforations for sand control w/ hydroxy-alumTnum.. · 7, Perforate the C-2 S~d from 5570' to 5590', 8, Complete the well w/ dual 2 7/8" tbg. strings & return well to production. ., ESTI~4aTED RIG OPEPATING TIb.~,: Ten C10) Days. ." · ., .. 18. I hereby eertffF that the foregoing~rue and correct t. / · .- - .. / ~ -'~'' /.-~ District Drlg. Supt, DATE TITLE *See Instructions on Reverse Side Approved cop~-- ~, .~gemmed POOl, 5.1 5.1 5.1 5.1 5.1 POOL $.1 5.1 5.1 5.1 5.1 POOL S,'hk'I) B-4 B-4 B-4 B-4 S/LND C-1 C-1 C-1 C-1 SANq) B-3 B-4 B-4 B-4 B-4 -- C-1 C-1 C-1 C-1 C--2 St !o!¥r SYRING LO.,G STRING INTERVAl, 4691'-4712' 4766'-4788' 4800'-4841' 4902'-4924' 4924'-4950' INq'ERVAL 5352'-5374' 5387'-5428' S431'-5472' 5475'-5496' PROPOSED SIiORT STRING IL~I~.RVAL 4691'-4712' 4766'-4788'" 4800'-4841' 4902'-4924' 4924'-4950' LONG STP, lNG INTERVAL 5352' -5374 ' 5387'-5428' 5431'-5472' 5475'-5496' 5570'-5590' FOOTAGE 21' 22' 41' 22' 26' FOOTAGE 22' 41' 41' 21' JUi'i 5 I974 FOOTAGE 21' 22' 41' 22' 26' 'FOOTAGE 22" 41' 4.1' 21' 20' Tbg. t!anger- Cmneron I~aal 2 ~,,/a'''''-,-,-' ~: ('!'72) TUBING 2 7/$" 6.4# 136 jts. 2 7/$" N-80 lk~ttress ti,p,. 21 jts 2 7/8" . .,-S0 Srd tl)g. - ,~-o0 ]3uttress ]'dp j t$, 4 2 7lin 3-2 7/8" 6.4~i N-a0 8rd Pup j ts. 6 x-overs (8rd to buttress) Short '126 its. 2 7/~" N-80 3 j ts. 2 7/8" J-SS 8rd tbg. 3-2 7/a" ~uct~css Pup its. 1-2 7/8" 8rd Pup its. 4 x-overs (Srd buswess) ..... 52' 20" 78.6# csg. 956' 10 3/4" 32.7~ II-,10 c~: JUN 5 I974 ...... 3796' Otis "XO" sleeve. ....... 3830' Otis "N" Nipple Baker Dual "I2' piT. · ~'o blast jts. 4684 Five blast jts 4756' Three blast ~ts. 4" ' '" ----3983' Baker N-1 Mandrel. . ..... 4783~-4684~ 5 3/8" holes. I shot-no squeeze. Otis "XO" sleeve Baker safety jt. 5107 '---.----"-'--'.'-----" N-1 Baker Mandrel 5].5:;' ------" N 1 baacr p,a. 51~o ......... ~ ..... 4691'-4712' ! 4766'-4788' ~ 4800'-48'11' ~ ..... 4902~-4924~ \ 5352' -.5374 '] ,( ---5387' 5425 ..... 5431'-5472' ---5475'-5'i96' *Junk in hole' 1. Ball pein l:a:~mcr 2 22' 2" scallop gun 4 3/8" hpf 4 3/S" ..... .~5.)o' 17I'13 Top of cr.':t. ------5697' 7 r,,,,, ,,t, ..' ' , , OlO 26.4 ,) :~5 c'.;? LEASE. KENAI UNIT UNION OIL CO. OF CALIFORNIA REPAIR REPORT . · SHEET D · PAGE NO. VV-ELL NO. 43-7 FIELD KENAI GAS FIELD DATE 9/27/68 28 29 3O 10/1/68 1012168 E. T. D. DETAILS OF OPERATIONS, DESCRIPTIONS& RESULTS Moved in Santa FelDrilling Company rig #35 on Kenai Unit 43-7. Rigged up Halliburton. Killed well w/water followed by 80# cu.ft, mud, followed by 90#'cu.ft. mud. Unable to kill well by pumping down short string. Pumped down short string through a sleeve located above the Baker Model "K" packer @ 4226'. Installed Cameron back pressure valves in dual hangers and installed 8" S-900, 3000# hydril and double shaffer. Pulled and measured short and l°ng. strings. Replaced tubing across perfs with blast Joints, 4684'-4724', 4756'-4856' 4897'-4957' Found two joints of tubing w/holes cut by sand and gas opposite the perforated interval from 4766' to 4788'. Re-dressed Baker Model "K" packer and "stab in" assembly for both the Model N-1 and the "K" packer. Ran in hole' and circulated bottoms up. Ran long string w/blast joints opposite perfs. Stabbed into the N-1 packer @ 5155', tested to 1000# - OK. Rant 'short string but unable to reach packer @ 4221". Pulled short string and re-ran same w/3 Joints of 2-3/8" tubing on bottom w/accessories. (See tubing detail attached.) Unable to reach packer with short string. Pulled short string and long string. Re-ran long string. Ran short string. Unable to stab short string into' Model "K" packer. Pulled long and short string and found that friction between strings caused downward thrust, shearing a safety joint on the long string side of the Model "K" packer. Pulled short and long strings. Relocated Model "K" packer approx. 307' above previous setting depth. (See attached long string tubing detail). Removed otiS'2-7/8'' XO sleeve above "K" packer. Ran long string. Stabbed into Model N-1 packer @ 3892' with no difficulty, which would indicate the possibility of a dog leg @ approx. 4080' to 4380'. Tested Model "K" to 1000# - OK. Installed tree and tested tubing head and hanger Seals to 3000# - OK. With gas for Kenai Unit 43-6A, both strings were cleaned up and the casing blown dry. Closed sleeve in long string @ 5104' and a sleeve in the short string was left open @ 3795'. Well was available for production @ 10:00 AbI 10/3/68. TUBING DETAIL - See next pages RIG RELEASED 12:00 NOON 10/3/68 RECEIVED OCl 15 1968 ANCHOP, AGE ! ti LEASE KENAI UNIT UNION OIL CO. OF CALIFOrNiA . . · SHEET d PAGE NO. 43-7 VgELL NO. FIELD KENAI GAS' FIELD DATE E. T. D. TOP __ -0- 11.15 11.95 13.00 17.00 19.10 3892.70 3901.32 4211.00 4212.10 4684.28 4704.31 4724~31 4755.59 4756.44 4776.69 4796.79 4816.79 4836.79 4856.79 4866.79 4867.59 4897.66 4917.76 4937.91 4957.91 4990.51 5020.66 5022.13 5083.15 5091.52 5093.72 5107.12 5109.62 5120.07 5121.12 5121.87 5122.92 5154.52 5155.72 DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS ~T.7/8" TUBING DETAIL - LONG STRING BOTTOM JTS LENGTH DESCRIPTION 11.15 11.95 13.00 17.00 19.10 3892.70 3901.32 4211.00 4212.10 4684.28 4704.31 4724.31 4755.59 4756.44 4776.69 4796.79 4816.79 4836.79 4856.79 4866,79 4867.59 4897.66 4917.76 4937.91 4957.91 4990.51 5020.66 5052.13 5083.15 5091.52 5093.72 5104.12 5107.12 5109.62 5120.07 5121.12 5121.87 5122.92 5154,52 5155.72 125 10 15 11.15 .80 1.05 4.00 2.10 3873.60 8.62 309.68 1.10 472.18 20.03 20.O0 31.28 .85 20.25 20.10 20.00 20.00 20.00 10.00 .80 30.07 20.10 20.15 20.00 32.60 3O. 15 31.47 31.02 8.37 2.20 10.40 3.00 2.50 10.45 1.05 .75 1.05 31.60 1.20 KB Cameron Dual Hanger (2-7/8" DCB) XO 2-7/8" 8rd x Buttress Pup Jr. N-80 Buttress Pup Jr. N-80 Buttress Singles N-80 Buttress Baker Model "K" Packer (Dual) Singles N-80 Buttress XO Buttress x 8rd Singles (8rd N-80 tubing) Blast Joint Blast Joint Single (Srd N-80 tubing) XO (8rd x buttress) Blast Joint Buttress Blast Joint Buttress Blast Joint Buttress Blast Joint Buttress Blast Joint Buttress Pup Jr. Buttress N-80 XO Buttress x 8rd Single 8rd N-80 Blast Joint 8rd Blast Joint Blast Joint Single 8rd N-80 Single 8rd N-80 Single 8rd N-80 Single 8rd N-80 Pup Jr. 8rd N-80 Pup Jr. 8rd N-80 Pup Jt. 8rd N-80 Otis XO Sleeve 2-7/8" 8rd Baker Safety Joint Pup Jr. Buttress XO (Buttress x 8rp) Otis 2-7/8" "N" Nipple XO (Srd x Buttress) Butt Single N-80 N-1 Baker Mandzml ("D" stab in) 157 5155.72 Total Long String RE CEIVEO oCT 1 1968 DIVISION OF MINES & MINERALS · ANCHORAGE UNION OIL CO. OF CALIFORNIA · SHEET D · 3 PAGE NO. I I KENAI UNIT LEASE Vv-ELL NOi 43-7 FIELD KENAI GAS FIELD DATE E. T. D. DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS DETAIL - SHORT STRING TOP . 11,15 11,95 13.05 ,13.59 15,74 25.84 35.89 3.794,56 3795,71 3798,36 3828,71 3829.81 3831.06 3832.16 3816.98 3893,85 3901.89 BOTTOM 11,15 11.95 13,05 13.59 15,74 25.84 35,89 3794,56 3795.71 3798,36 3828.71 3829,81 3831,06 3832,16 3861,98 3893.85 3901.89 JTS LENGTH DE SC RI PT ION __ 122 11,15 · 80 1,10 ,54 2,15 I0,10 10.05 3758,67 t. 15 2,65 30,35 1,10 1,25 1,10 29.82 31.87 8.04 KB Cameron Dual Hanger 2-7/8"DCB 2-7/8" 8rd x 2-7/8" 8rd Pup XO 8rd x butt Pup jr. butt Pup jr. butt Pup Jr. butt Singles 2-7/8" butt tgg (N-80) XO 2-7/8" butt x 2-3/8" 8rd Otis 2-3/8" XO sleeve 2-3/8" 8rd t.bg single (J-55) 2-3/8" XO 8rd x butt 2-3/8" Otis "N" Nipple 2-3/8" XO butt x 8rd 2-3/8" 8rd tbg single (J-55) 2-3/8" 8rd tbg single (J-55) Baker N-1 pkr stab in mandrel 125 3901,89 Total Short String Form P~? ~ SUBMIT IN DUPL! ~* ~- 'STATE OF ALASKA (See other i~: ~-' structions on OIL AND GAS CONSERVATION COMMISSION reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG * .. la. ~YPE OF .WELL: ..... 0zI .... ~ ~AS. ~vEL~ LJ WELL b. TYPE OF COMPLETION: WELL OVER EN BACK NAME OF OPERATOR Union Oil Co. of California ADDRESS OF OPERATOR ........ ~ ~r MINE5 & MiiN~AL~ ............................................. ANCHORAGE 2805 Denali St., Kuchorage~ Alaska 99503 4. LOCATION OF WELL (Report loc~tion cle~rl~ ~n~ in ~ccor~nce ~i~A ~n~ $~t6 red.tremorS)* ~t,u~.~e 404'8 and 4231'E from the NW corner Seo.7,T4N,RllW,S At top prod. interYal reported below Effective: July 1, 1964 5. ·LEASE DESIGNATION AND SERIAL· NO. · A~028142' 6. I~ INDI&N~ ALLOTTEE OR TRIBe_ N~-ME · Ken~i Unit 8..~ARM Ga. LmASl~ N~.ME : : , _ :KU 43-7 ~' 1.0, FIELD: AND POOL, .OR ~WILDCAT . . ; ': Ke~ai GasField ~1; SEC., ~.,.R., M~ OR B~OCK AND SURVEY , ;;: ' OR ( . 2748'S and' 4177'E from the NW corner Sec. 7,T4N,RllW,SM ::' .-. 3~~_~lit~d 4178'~;f;cm:tlr~-~_-;.. 8ec_7_Tan_I~l ]W_aM .~ . a~a '~ 7~a~r_ ~.~ ~xar ~M ~ ' ~ I 14. P'R~IT NO:' ' ~ ---'-~T~ ~-- 12..B~R~H' '~' I~;~"~A~"' '~ -"~ ~ ........................ ~ I 65-11 ~o IApril 26,1965 K~atPenn. l.~aska ~"~ 6;z5-65 I 6-25-65 [ 7-3-65 I R~ 92' '' ' ,I ' '~9' :_ 23. INTERVALS ROTARY ~OLS CABLE TOOLS DRILLED B,~ ~ 0~:.57.'' '07 , ,. j-- _' . 20. TOTAL DEPTH, MD & ~ [ 21. PLUG, BA~K T.D., MD & TYD [ 22. IF MULTIPLE CO MPL., HOW MANY$ 570i7' (4788'TVD) 5593' (4691'TVD) Two 24. PRODUCING INTERVAL(S), OF THIS COMPLETION TOP, BOTTOM, NAME (MD AND. TV.D)* Module 5.1 4691-4950' (3959-4160',TVD) _ Module 6 5352-5503' (4489-4615',TVD) ,. 26. TyPE ELECTRIC AND OTHER LOGS RUN W)~S DIEF4~. TIONAL Yes '" WELL CORED lES, Sonic~ Microlog, Gamma Ray, Cement Bo~d-. 28. C~ ASING SIZE 20" 10-3/4 SIZE CASING RECORD (Report al~trtngs set tn.well) WEIGHT, LB./FT. DEPTH SET (MD) HOLE SIZe' t CEMENTING Rm~ORD - 78 6~: 52' 20" ' - None : 32[75 956 17-1/~,' 1100 sacks. 26~4 5687 9-7/~' ~ 575 sacks . LINER RECORD ' 30. TUBING RECORD 2-7/81 5169 I ,.~-: · 2- 7~g '~ ' 4234 'AMOUNT ~ULLED NOne: )None. i~ACKEB SET 1422.61': 29, 81. P'~RFORATION RECORD (Interval, size and number) 4691-4712 5352-5374 ) DE/~ ~N~ER~.~L (MD) 4;766,478.8~ , . 5387--5~28) .4,~/8"j_et :"}. ...... 4800--4841 5431--5472 ) holes per foot 4902-4924 5475-5496 ) 4928-4950 ,_ A~ciD, SHOT, FRACTURE, GEMI~NT S~uEEZE, ETC;' '- 33.* PRODUCTII)N DATE ~IRST ................... PRODUCTION ] PRODUCTION METHOD (F~o$o{ng, g~t8 ~i~t, ~U'll$~ing~8~,ze ~J'i,~,'t~pe O~ ~mp) PROD'N. FOR 0IL~BBL. TEST PERIOD~_~ t' [ DATE OF TEST HOURS TESTED CHOKE SIZE aAS MCF. FLOW.. TUBING PRF~8, AMOUN~L ,ND ]~I~O OF` MATERIAL :;USED · : . · WELL STATUS (P~'od~otng or ~,Shut in ' ' WATER--BBL. [ GAS-OIL RA~IO WATER BBL. OIL GRAVIT~'API i'e6RR.) 34. DISpQ$ITI. QN ~OF G_AS ( 80g~,.USed for ~uel~ ve~t~d, etc.) 35. LIST OF ATTACHMENTS ' 8{I. ! ;hereby eert rig' ~ifiit~ ehed Information 1~ complete Rnd: correct -RS determined from all awifl~bi~ re~ord~ SIGNED ~/~~ . I TITLE Drilling Engineer . *(See Instructions and Spaces for Additii~l Data :on Reverse Side)" INSTRUCTIONS General: This form is designed for submitting a complete .and correct well completion report hnd lOg on all .'types ' of lands! and leases to either a Federal agency or a Sta'te or both, pursuant to applicable Federal and/or State laws and regulations. Any'necessarY special, instructions concerning the use of this .form and the number bf coPic~ submitted, particularly with regard to local, area., or regional p~'0 .cedures and practices, either are shown b~lbw or will be. isSued by, or ma'~. be obtained from, 'th~ locat and/or State office. See instructions on items 22 and 24, and 33,.belOw regarding separate.relJorts for separa~ compIetior~s. : -- .~. ;. ,- If 'not fi.led prior to the time this summary record is submitted, ':~.o~es of all curren~tly availabl~10gS (drillers,'. geoi0gfsts, SampFe and core 'ahgly~is, all types:;electr~c, etc~') tion and pressure tests, and directional surveys, should be a~tached hereto, to the extent reqhired by applicable Federal and/or State laws and re ' latib :~ should be listed on this;form, see item 35. gu n,~: ~11 at~ac?~, Ifem 4: If there are no applicable ,State requirements, locations on Federal or Indian land Should be described in accofdanc~e with Federal requirements,! '(Co~ult lode1 or Federal office for specific i~structions.. I'l'em 18: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other ~paces on this~form'and, in anf'~tt~chmen~i' Ifems 22 and 24: If this well is completed for separate production from more than one interv~/1 zone (multiple :completion), so state in item 122, and in:'item 24,,sho~ the P~d~,~, interval, or intervals, top(s), bottom(s) and name(s) (if anyj lot only the interval reported in item 33. Submit a separate'report (page') on t.hiafO~m,~.ad~equately id?~- for each additional interval to be separately produced, showing the additional data pertinent to such interval. ~ · ' ...... '-~ ~, ' - I~ern 29: "~acl~s Cement": Attached supplemental records for this well shoUld show. the details of any multil~le stage cementing and the locati°n of the cem'enting~ool. ~ . Ifem 33: Submit a separate completion report on this form for each in~terval to. be. separately produced. (See instruction for items 22 and 24 above.) ~ . , ,, ,. · · · ~ ~'., : ~ ~ '~.., ".~7. S'.UMMARY OF:POROUS ZONES: ' '/ii~' · ~"~ - i .~ . SHOW' ALL IMPORTANT ZONES OF POROSITY AND CONTENTS', THEREOF ;' '~oRED INTERVALS; 'AND ALL DRILL-STEM TESTS, . ~.' DE~H INTERVAL ~ESTED~, ,CUSHION US~D~;. TIME.. TOOL 0PEN;~, FLOWING, AND. SHU'~-INr PRESSURES, AN~ RECOVERIES In bedded Sh d :Ksnai Gas Zone= 4219 5605 ter ale, san .~d ,. ' ~ -. . :coal. . ,. . · , . ._ . ~:. . ~ . s : ~.. . . ,: , · _ .. - ~ ', .' ~.... :. .. · . ~ . - . 9 . DM-12 ~..1.ease Date 8,,1316,,,7 .... ._ State of Alaska Department of Natural Resources DIVISION OF MINES AND MINERALS Petroleum Branch INDIVIDUAL WELL RECORD Sec. .... T ...... 4N R. llW S~ ; ~ridian Pe%~nit No. 65-11 Issued 4/26/65 OperatorUnion 0il Co. of Calif. Location (Surface)404' FNL & 4231' FWL, Sec. 7 Lease No, A-028142 or Owner Kenai Unit Well NO. 43'7 Suspended Completed (F-GL-P) 7/3/65 Loc. (Bottom) 3264' FNL & 4231' FWL, Sec. 7 Area Kenai Drilling ceased 6/25/65 Abandoned IP B/D, Gray Total Depth 5707' Elevation 78.48 Grd. 92'_'K.B. 79' Csg. Hd. API Cut______% Gas _~___:_: MCF/D, Bean. ,: /64 CP psi, Casing ~ Size Depth Sx Cmt Perf: 4691 '-4712' 4766'-88'; 4800' -41' 20" ...... 52' Non~e_ _ .4902'-2A'.: Z~92R"-c,O' TP ...... : psi Plugs ~ 10 3~4" 956' 1100 5352'-74'; 5387'-5428' 543i'-71~' ;"547'5"2-9'6' ..... ~ -~- ~ 7 5/8" 5687' 575 ~,tS' 2~ 7/8" "'51~9' ~ack~- 516U; $,/~S _ _2 7/8" . 4234' .Packer._ 4226' GEOLOGIC PORMATIONS ................... PRODUCTIVE' HORIZONS Surface Lowest Tested_ Name Depth Contents WELL STATUS Year jan Feb Mar_. _Apr May June July Aug Sept Oct Nov Dec Remarks: . CONTRACTOR:: Coastal Drilling Company . REPORT and ~ PLAN RECEIVED SEP 20 1965 DIVISION OF MINES & MINERALS ANCHORAGE of SUB-SURFACE SURVEY UNION OIL COMPANY KENAI UNIT N~- Zl.3- 7 KENAI, ALASKA JOB NO DATE _dUNE 1965 DRILLING CONTROL CORPORATIOI 3327 LIME A VEI~E LONG BEACH 7, CALIFORNIA ~~,, DRILLING CONTROL CORP. S,EET no. SURVEY DATA SHEET COMPANY [~t'~lM~ 0t~ ~ DATE , ._1[~ '~lt~ JOB NO. WELL _~U_~7 FIELD ~1~ COUNTY___ STATE TRUE RECTANGULAR COORDINATES MgASURED DRIFT DEVIATION DRIFT VERTICAL REMARKS DEPTH ANGLE DEPTH COURSE DIRECTION NORTH SOUTH EAST WEST 88 O° 30' 88 O0 77 N 06° E 77 08 238 2° 00' 237 97 174 S 32° · 71 330 40 00' 329 75 642 $ 24° # 6 ]57 345 391 7° 4~t 390 ][9 8,23 S 270 t~ 1396 7 ~53 l0o 30~ 451 15 Il 30 s Ilo w 24 ~ ~ 9 34 513 12o 30' 509 r3 12 9~ s o9° # 37 82 11 37 573 16o 30* 567 'E I7 04 $ 04° # 5482 12 56 727 19o 15' 714 ~0 20 44 $ 03° W I0t34 14 54 827 19° 30* ~306 2~ 33 38 SOUTH 13472 14 54 920 18° 15' ~3% 58 29 12 S 09° E 16348 9 90 950 20° 30' 924 56 10 51 S O1° E 17399 9 80 I010 24° 00' 979 49 24 40 $ 07° W 19621 12 77 1090 23° 30' 1(152~ 31 90 $ 09° t~ 22972 ~ 76 1183 26° 15' 1136 26 41 13 S 09° ~ 27035 24119 1276 29° 30' 1217 20 45 80 $ 09° # 31559 31 36 1317 33° 30' 1251 39 ~ 63 $ 04° i~ 33817 32 93 I348 35° O0t 1276 78 17 78 S ~2o ~ 35594 33 55 1410 34o 00' 1326 [~ 34 67 $ ~o Ii: 390 ~9 3234 14;6 32° 00.' 1384 15 34 97. S C2° ~ 42554 31 12 1560 32o 00' 1463 ' ~2 49 28 S (]2o I! 47479 32 84 1725 32o 00' 1595 31 82 67 S ~2o # 55741 35 72 1882 320 45' 1727 35 84 94 $ 03° 1~ 64223 40 17 2040 33°15. 1859 48 8663 $05og 'T28~ ::3262 DRILLING CONTROL CORP. SURVEY DATA SHEET COM,'^.¥ i{ntfm_.0tl ~ ..................................... ,:)^TE .... .June t96~ wEL- .... g!l___~? ,~,E,_D ~al COU.T¥__ SHEET NO. 2 JOB NO. TRUE RECTANGULAR COORDINATES MEASURED DRIFT VERTICAL DEVIATION DRIFT DEPTH ANGLE COURSE DIRECTION - REMARKS DEPTH NORTH SOUTH EAST WEST ,, , 2191 33° 30' 1965 40 83 34 S 020 E , ,811 82 ~ 71 2342 33° 30' 2111 32 83 M $ 01° E 895 I5 28. ~ 33° 30' 2239 74. 84 99 $Ol° I~ · gSO 13 26 76 2657 33° 15' 2~74 38 88 28 S 01° Ii 106840 2.5 22 2970 33° 15~ 2636 14 17162. $ Olo E 123g99 ~2 20 3053 33° 00' 2705 75 45 21 $ 0~o g 128517 .. 20 ~ 3219 34° 30' 28425~. 94 02 S 08° # 1379 06 25 54 3373 36° 15' · 2966 74 91 06 ~ ~O 12 .. 25 54 ~ 40° 45' .320q 78 10! 83 $ 020 # ~67027 . 32 53 3838 42° O0~ 3321 25 IO037 SOO'~ .:i77(] 64 ' . 32 53 3994 42° 30.' 8~:,. 27 105 ~ $ 03° ti laT,J ,88. 38 M 4142 43° 00' ~ 51 10094 $ O1° W '.!976 80 39. 81 4182 43.0 00" 357'3 '76 2728 ~ ~ 05' 39 81 4338 42° 45' ~ 31 10589 S 02o # 210991 43;50 3899 380 45' 4115 77 .5821 $ 02° E 247250 52 34 5207 35~ 15' 43~. II 88 8~. S 01~ # ~ 59 53 90 ~ 34° 30' 4519 04 10648 S 01° E 7761 (15 52 04 5707 31° 30' 4783 61 ilo99 S Olo # 29263~ 53 ~ CLI/S~ .2926 89' $ 01e 03' # , , ,, , , ,, ,,, , ,, Form, P I _. ,,~ ,_, ~-~ ~. - SUBM.I~ .IN TRlq ATE* . .. ~_ .... ...... AND: GAS cONSE~VATiON~';C~I~N ~mtF-INDt&N~ IL~TTE[ OR'TRIBE NAM~ APPLI'CATION FOR:~'PERMIT~' ~TO?'~DRILL;~ DEEPEN>~OR'~PEUG B~CK": ..... . ....... ..... ....... "'-p Ue ..... ':: ...... DRILL' ~ ':~:>/'~ :'~ NAME OF~ OPERA~R. Union .O~, ,C~. G , · ~. ADDRESS OF OPERATOR ;~.:~ .-~ ~:-~ , ;~.- 2805 Denall St. ~ ~chorage~ 4. LOC~[eN~.~ ~L~ :{~eport lo~tlon ~ea~lyi~dtn<ac~rda-nce wt~-anF:S~e A~ ~rf~ 404" south and 4231' east from the NW corner Sec. ~t ~,opo,~a p,oa. ~ 3264' south and 4231' east from the NW corner Sec. 7, T4N, Rl lW, SM ~4. DISTANCE IN MI~ES AND DIRECTION FROM NEAREST TOWN 7 air miles southerly from Kenai Kena'i GS~'s' FIeid 11. SEC., T.,B.~ M., OR~BLK.,, Sec 7~T4N~R11W¢SM 12. B.OROUGH SHI 13. STATE Kenai Penn. [ Alaska 1§. DISTANCE FROM PROPOSED* LOCATION TO NEAREST 2250' (lease line) PROPERTY OR LEASE LINE, FT. (Also to nearest drlg. unit line~ if any) ~S. DISTANCE FROM PROPOSED LOCATION' 4 5 5 0' TO NEAREST *WELL, DRILLING, COMPLETED, 21. E~YA~O~S (Show whe~er DF, ET, GE. e~.) 78' ~r 16. NO. OF ACRES IN LEASE 2560.00 19. PROPOSED DEPTH 5600'MD 17. NO. OF ACV~S ABSIONED TO THIS W~LL 320 9-0. ROTARY ;OR CABLE TOOLS Rotary J22[ APPROX. DATE WORK WI/~L START* ., June 11¢ 1965 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING I WEIGHT PER FOOT SETTING DEPTH QUANTITY 0F CEMENT 14-3/4" 10-3/4" I 32.75~ 1200' 580 sacks 9-7/8" 7-5/8" .26 4.~_ 5flog' ... fi5O san'ks Due to swampy terrain, it is economically unfeasible to build roads and locations for each individual well. This well will therefore be directionally drilled from a cerZrally located drilling island. 1. MoVe in and rig up. 2. Spud in with 9-7/8" bit and drill to 200'. 3. Directionally drill 9-7/8" hole by jet deflecting from 200' to 1200'. hole to 14-3/4" to match surface casing. 4. Cement 10-3/4", 32.75~, H-40 casing at 1200'--+. 5. Install and test 10", 30005 blowout prevention equipment. 6. Install gas analyzer unit. 7. Directionally drill 9-7/8." hole to 5600' (MD). Open 9- 7/8" 8. Run Schlumberger wireline services. IN ABOVE SPACE DESCRIRE PROPOSED PROORAM: If proposal is to d~pen or plug bask, gtve data on present productive zone and ~bd~'~h~produetive zone. ~ propos~ ts to d~ deepen~ireetion~ly, give pertinent data on subsu~ace locations and measured and true v~rtical d~pths. Give blowout ~. ~ . ~ . ~ Drillln~ ~n~neer ~ R_ ~_ H~tmann ·-- PERMIT NO. 65-11 ~o~,T,ONS OF. APPROVAL. I, A,,: T, R, M~r shal 1 ~ Jr, APPROVAL DATE April 26: 1965 .... . Executive Secretary .... OATEAprll 2R~ 1965 0il and Gas Conservation Committee Subject to Conservation Order #16. *See Instructions On Reverse Side Application for Permit to Drill KU 43-7 April 2.2, 19 6 $ · lO. ll. 12. Cement 7=5/8" 26.45, J-55 casing below deepest gas sand. Make WSO and production tests as required. Run collar locator and perforate four 3/8" jet holes per foot as required in production modules 5 and 6. Run and land dual strings of 2-7/8" tubing with two production packers as follows: a. One packer above module 6 perforations o b. One packer above module 5 perforations. 13. 14. 15. Test packers and install Christmas tree. Change over mud to fresh water and swab in. Shut well in until production facilities are installed. v,/ ¢ 7'~N ":121 7 N W COR. SECTION 7 SCALE I": 200' LEGEND and NOTES. ~ SURFACE LOCATION I~ FOund U.S.G.L.O. brass cap monument. All bearings refer to the G.LO. datum of North for the West boundary of Section 7. Elevations refer to Mean Low Tide es being 0.0 ft. determined from the U.S.C. andG.S, tide datum for the Kenai River entrance. UNION OIL COMPANY OF CALIF. OPERATOR KENAI UNIT 4:5- 6 SURFACE LOCATION LOCATED 204..8 FT. SOUTH AND 42:31.0 FT. EAST FROM THE N W CORNER' OF SECTION 7~ T4N, RIIW, S.M.~ ALASKA. SURVEYED BY= KENAI UNIT 43- 7 SURFACE LOCATION LOCATED 4'04.0 FT. SOUTH AND 42-31.0 FT. EAST FROM THE NW CORNER OF SECTION 7, T4'N~ RIIW, S.M., ALASKA. Stanley S. McLane, R.L.S. I Dote April 8) 1965