Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout180-083• STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended zaAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., o ba .. 6/28/2010 12. Permit to Drill Number: 180-083 310-106 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded: 09/07/1980 13. API Number: 50-029-20497-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached: 09/27/1980 14. Well Name and Number: PBU J-13 FEL, SEC. 09, T11 N, R13E, UM 1049 FNL, 803 Top of Productive Horizon: 3739' FSL, 2323' FWL, SEC. 03, T11 N, R13E, UM g. KB (ft above MSL): 69.1' GL (tt above MSL): 40.27' 15. Field /Pool s ()~ Prudhoe Bay Field / Prudhoe Bay Total Depth: 4048' FSL, 2583' FWL, SEC. 03, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD): 9609' 7723' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 643555 y- 5970304 Zone- ASP4 10. Total Depth (MD+TVD): 11800' 9447' 16. Property Designation: ADL 028281 TPI: x- 646578 y- 5975153 Zone- ASP4 Total Depth: x- 646832 Y- 5975466 Zone- ASP4 11 • SSSV Depth (MD+TVD): N/A 17. Land Use Permit: f P f t TVD Thi k 18. Directional Survey: ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore: N/A ft MSL erma ros ( ): ness o 20. c 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIL / GR, DIL / LL8 / SP / GR, BHCS / GR, FDC / CNL /CAL / GR, CBL / VDL / GR / CCL 22. Re-DrilULateral Top Window MD/TVD: N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " 3 " Insulated n u r rface 110' S rf 110' 6" 12 cu Arctics / " 72# 2 2 Ar i I 9-5/ " 47# L-80 urface 10780' rf 8592' 12-1/4" 1535 c ft 'G' 1 0 ft A I & 707 cu 'G' 7" 29# L-80 1 264' 1179 ' 2 443' 8-1/ " 427 las ' 24. Open to production or injection? ^ Yes ®No 25. TuewG RECORD If Yes, list each interval open Perforation Size and Number): MD+TVD f T & Bottom SIZE DEPTH SET MD PACKER SET MD / TVD ; ( o op 7", 26# x 4-1/2", 12.6#, L-80 10333' 10226' / 8176' MD TVD MD TVD Cut at 9800' 26. ACID, FRACTURE,. CEMENT SQUEEZE, ETC: DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED " ,;, f, ~ ~ ;~ I . ~, * , • ~" - 9852' P&A w/ 45 6bls Class'G' ' _ . 9639' Set EZSV (to cut 9-5/8" casing at 1751') , 9593' Set Whipstock (Top of Window at 9609') . 27. PRODU CTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: Production For Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 28. CORE DATA Conventi onal Core(s) Acqui red? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and res n of water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory an~j i~ a 250.071. n ' None ~~~ ~ ,~~, ~~1~~ ~~ RBOMS ,~J~, ~ 9 ~Illtsk~ ~ $~ Gas Cis. Ctxnmission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE ~ 5uomlt unglnal unly 29. GEOLOGIC MARKERS (List all formations and ma ncountered): 30. NATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10874' 8665' None Shublik 10927' 8707' Ivishak 11025' 8786' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ ~ J/~ ~~~ Signed: Terrie Hubble Title: Drilling Technologist Date: / v PBU J-13 180-083 310-106 Prepared By Name/IVumber. Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Jacob Thompson, 564-5579 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • J-13, Well History (Pre Rig Sidetrack) Date Summary 4/26/2010 T/I/O=SSV/50/0+, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test port (0+ psi), bled to 0 psi. Function LDS, 4 LDS stuck (flagged) all the rest moved freely (2.5 "). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port (50 psi), bled to 0 psi. Function LDS, all moved freely (2.5 "). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 0 psi in 30 min (PASS). Bled void to 0 psi. 4/28/2010 WELL SHUT IN ON ARRIVAL. PULL PRONG (1-3/8" F.NECK, 1.50" BODY, 84.5" OAL) IN 2-7/8" PLUG BODY C~3 10,297 SLM. RIH TO PULL PLUG BODY ~ 10300 SLM. 4/29/2010 MADE SEVERAL ATTEMPTS TO PULL NIP. REDUCER AT 10300' MD (unsuccessful). RAN 2 7/8" GS TO LATCH P-PLUG BODY (unsuccessful). RAN 1-1/2" PUMP BAILER TO 10293' SLM (recovered plastic coated tubing). STANDBY FOR HIGH WINDS. 5/3/2010 ARRIVE ON LOCACTION, WELL S/I. MADE SEVERAL RUNS WITH 10'- 2.25" PUMP BAILER W/ SNORKEL BOTTOM. RAN KJ, 2.24" CENT., 2 7/8" GS (unable to latch). RAN 10'- 1.75" PUMP BAILER WITH MULE SHOE FLAPPER. 5/4/2010 MADE TWO RUNS WITH KJ, 5'- 2.25" PUMP BAILER WITH SNORKEL BOTTOM. PULL 2 7/8" PX PLUG BODY FROM 10292' SLM (10300' MD). PULL 4 1/2" x 2 7/8" NIPPLE REDUCER FROM 10291' SLM (10300' MD). LOCATE TUBING TAIL AT 10323' SLM (10340' ELMD) + 17' CORRECTION. TAG TD AT 11576' SLM + 17' CORRECTION = 11593' ELMD. WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF VALVE POSITIONS. 5/8/2010 T/I/0=0/0/0 (Infectivity Test for P&A) Pump 10 bbl neet meth spear down TBG followed by 1 %KCL at Max rate not to exceed 3000 Psi. 5/9/2010 Continue pumping 1%KCL down TBG Max Rate C«~ 3000 Psi. Rate. Pump rate gradually came up from 1 bpm C~ 3000 Psi to 5 bpm C~! 430 bbls away C~ 2650 Psi. Went to 5.5 bpm C~ 475 bbls away and 2550 Psi. Pumped remaining 1% KCL ~ 5.5 bpm for a total of 855 bbls away. Pumped 5 bbls neet meth down TBG. Standby for fluid support. Pump 100 bbls dead crude followed by 5 bbls diesel down TBG to freeze protect. RDMO. Standby to monitor pressures and fluid in cellar. FW HP= 0/80/0 Operator notified of valve postions. Performed H2S table top drill. Discussed emergency procedures. 5/16/2010 T/I/O =Vac/170/0. Temp = SI. T, IA & OA FL's (Pre FB). No flowline or AL. TBG FL & OA FL near surface. IA FL C~3 surface. 5/19/2010 Fullbore P&A. MIRU SLB cementers. Fli i ack wall with 550 bbls 1 %KCL and P&A with 45 bbls 15.8 ppg "G" cement. Displace cement with diesel. Estimated TOC - 10 091'. _RDMO. Left 1000 psi on well. DHD to monitior Tubing psi., tanks released and Valve Shop notified to service tree. Job Complete. 5/20/2010 WELL S/I ON ARRIVAL. TAGGED TOC C~ 9,852' SLM W/ 3.50" CENT, 3.00" S-BLR (Sample of cement). DRIFT TO TUBING HANGER W/ 6.335" DUMMY BPV (Good ring on drift bottom). DRIFT TUBING TO 9,835' SLM (Target 9,800') W/ 5.76" CENT (No issues). CURRENTLY POOH W/ 5.76" CENT. 5/21/2010 PERFORMED SUCCESSFUL MIT-T TO 2500 PSI W/ TRI-PLEX (See data tab #6). WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS. 5/21/2010 WELL SI ON ARRIVAL. INITIAL T/I/O = 1000/500/0 SPOT IN AND RIG UP ELINE. 5/22/2010 CUT TUBING AT 9800' WITH OWEN 5.5" EXPLOSIVE CUTTER. H2S MAN DOWN DRILL WITH CREW AND WELLSITE LEADER. FINAL T/I/O = 650/600/0 JOB COMPLETE. WELL LEFT SI. Page 1 of 2 • J-13, Well History (Pre Rig Sidetrack) Date Summary 5/23/2010 T/I/0= 600/600/20 Temp= S/I Circ-Out, CMIT-TxIA PASSED to 3500 psi (Pre CTD) Pumped 5 bbl Neat meth spear followed by 729 bbls 110°F 1 % KCL down the IA, through the jet-cut C~ 9800', up Tbg taking returns to J-08 Flowline. Pumped 160 bbl Diesel freeze protect into IA. U-tubed freeze protect into Tubing for 1 hour. CMIT-TxIA: Pressured up TxIA w/ 6.5 bbls diesel. TxIA lost 80/80 psi in 1st 15 mins and 40/40 psi in 2nd 15 mins for a total loss of 120/120 psi in 30 min test. Final W HPs 0/0/0 5/24/2010 T/I/0=0/VAC/0, Temp=Sl. Remove and replace 4 stuck LDS. 4 stuck LDS on TBG head (flagged). Stung into TBG hanger test void (0+ psi), bled to 0 psi. Verify 0 psi on TBG & IA. Freed up 3 of 4 stuck LDS, replaced with new assemblys. The LDS that is still stuck is above the IA valve. Will need to swap IA valve to other side of tubing head for drill clearance. 5/25/2010 T/I/O=0/VAC/0, Temp=S1 Attempt to remove stuck LDS RU 1 HP BT onto THA test void 0 psi. 1 LDS "Standard" stuck, attempted to remove flats broke. W IE notified of condition of well. WIE instructed to wrap up job FMC JIT will have service cut nose off LDS under Rig. Page 2 of 2 • North America -ALASKA - BP Page 1 °~ 2 Operation Summary Report Common Well Name: J-13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 ~ End Date: X3-OOV33-C (635,950.00 ) I I _ _ _{ Project: Prudhoe Bay Site: PB J Pad i Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/2/2010 07:00 - 12:00 5.00 MOB N WAIT PRE MOVE DOYON 141 OFF OF WELL # W-01 A. STAGE ON W-PAD TO PERFORM GENERAL MAINTENANCE WHILE WAITING ON HIGH WATER AT THE KUPARUK RIVER. 12:00 - 21:00 9.00 MOB N WAIT PRE i PERFORM GENERAL MAINTENANCE WHILE WAITING ON HIGH WATER AT THE KUPARUK RIVER. - 21:00 - 00:00 ( 3.00 ~ MOB ---- P - - PRE CHECK SIX TRAINING FOR BOTH DRILLING I CREWS. _ _ 6/3/2010 00:00 - 03:00 3.00 MOB P PRE CHECK5IX TRAINING BOTH CREWS. 03:00 - 06:00 3.00 MOB N WAIT PRE WAIT ON BRIDGE ACCESS ACROSS KUPARUK RIVER. PERFORM GENERAL MAINTENANCE AND CLEAN RIG. 06:00 - 00:00 18.00 MOB N _ WAIT PRE WAIT ON-BRIDGE ACCESS ACROSS KUPARUK RIVER. PERFORM PREVENTIVE MAINTENANCE I I PER DOYON MP2 SCHEDULE, HOUSEKEEPING, CLEANING PARTS VANS, SDPOT AND RIG UP ENVIROVAC, REPLACED PIPE SHED DOOR LIFT CABLES, REPAIR ACCUMULATOR AIR PUMP, REPAIR HYDRUALIC LEAKS ON ACCUMULATOR, REPLACED BLADDERS IN THREE ACCUMULATOR BOTTLES, REPAIR LEAK ON ACCUMULATOR AIR PUMP AND TEST ACCUMULATOR POP-OFF TO 3,500-PSI. 6/4/2010 00:00 - 06:00 6.00 MOB N WAIT ' PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J-13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. 06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J-13A. I CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. 6/5/2010 00:00 - 06:00 6.00 MOB N WAIT _ PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J-13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. __ 06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J-13A. i CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. SPOTTED ,SUB AND RIG COMPLEXES TOGETHER ON SOUTHEAST CORNER OF W PAD. RECONNECTED SERVICE LINES AND POWERED ~ UP RIG. REMOVED DOUBLE FLANGE 13-5/8" -~ I - SPACER SPOOL FROM BOP STACK. Printed 7/1/2010 11:32:45AM • North America -ALASKA - BP Page 2 of =' Operation Summary Report Common Well Name: J-13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 End Date: X3-OOV33-C (635,950.00 ) __ _ Project: Prudhoe Bay Site: PB J Pad i Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) __ 6/6/2010 00:00 - 00:00 24.00 _ MOB N WAIT PRE -CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J-13A. CONTINUED WORKING ON GENERAL RIG i MAINTENANCE AND HOUSEKEEPING. WORK ON ~ ~ DERRICK MAINTENANCE AND REPAIRS PER BILL HOPKINS AUDIT. WSL - HEFLEY: VISUALLY INSPECTED AND VERIFIED INTEGRITY OF ANNULAR PREVENTER ELASTOMER CLOSING/SEALING ELEMENT. NO VISIBLE ~ TEARS OR MISSING MATERIAL OBSERVED FROM ELEMENT. INSPECTED LINERS, SWABS, VALVES AND SEATS IN MUD PUMPS #1 & #2. NO FAILURES OR EXCESSIVE WEAR IN ANY COMPONENTS. _-_-. 6/20/2010 ___ 06:00 - 18:00 12.00 MOB P PRE JACK UP BOILER,'MOTOR ROOM, PUMP, AND ~ PITS, COMPLEX AND HOOK UP TO PEAK SOWS. ~ ~ - MOVE FROM W-PAD TO J-13A. HOOK UP TO ~ THE SUB COMPLEX AND MOVE FROM W-PAD TO I i J-13A: SPOT BASE OVER WELL AND LAY MATS AND SPOT COMPLEXES. LOWER AND SECURE ALL STAIRWAYS. HOOK UP SERVICE LINES BETWEEN ALL COMPLEXES. PRESSURE ON THE WELL WHEN MOVING OVER WAS 0 PSI i ~ ON THE OA AND IA. - ~----- 18:00 - 00:00 6.00 MOB P PRE -RIG ACCEPTED @ 18:00 ON 6/2 012 0 1 0 SPOTTED OPEN TOP BLEED TANK AND HARDLINED INTO WELLHEAD. PRESSURE TEST TUBING X INNER ANNULUS TO 2000 PSI FOR 10 MINUTES. NO PRESSURE BLED OFF DURING TEST. GOOD TEST. OA AND IA 0 PSI WHEN MOVED ONTO WELL. 6/21/2010 00:00 - 03:30 3.50 MOB P PRE TAKE ON HEATED 8.5 PPG SODIUM CHLORIDE INTO THE PITS. RIG UP ALL THE CIRCULATING LINES IN THE CELLAR. PRESSURE TEST THE HARDLINE TO 3500 PSI. GOOD TEST. Printed 7/1/2010 11:32:45AM • North America -ALASKA - BP Page 1 ~ Operation Summary Report ___- Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) __ 6/21/2010 03:30 - 04:30 1.00 DHB P DECOMP RIG UP AND PRESSURE TEST LUBRICATOR TO 500 PSI. GOOD TEST. PULL THE BPV FROM THE WELLHEAD AND RIG DOWN THE BPV. 04:30 - 05:00 0.50 CLEAN P DECOMP PRIME UP THE MUD PUMPS AND CIRCULATE THROUGH THE LINES TO VERIFY ALL LINES AND CONNECTIONS ARE HOLDING. - ----- 05:00 - 09:45 - 4.75 ~ - CLEAN P DECOMP RIG UP AND REVERSE CIRCULATE 8.5 PPG ~ ( SODIUM CHLORIDE AT 3 BPM WITH 500 PSI FOR ~ i 1p5 BBLS UNTIL THE RETURNS WERE DIESEL FREE. SHUT DOWN AND SWAP OVER TO PUMP THE IONG''.WAY. CIRCULATE 40 BBLS FOLLOWED BY THE 35 BBLS SAFE SURF PILL. PUMPED A TOTAL DF 730 BBLS THE LONG WAY TAKING RETURNS TO THE OPEN TOP TANK. I PUMPED AT3 BPM WTIH 200 PSI, 4 BPM WITH 400 PSI, 5 BPM WITH 600 PSI, AND 6 BPM 900 PSI FCP: 09:45 - 10:15 0.50 CLEAN P DECOMP BLOW DOWN AND RIG DOWN THE CIRCULATING LINES. OA = 0 PSI 10:15 - 11:00 0.75 ; DHB ' P DECOMP RIG UP AND DRY ROD IN THE TWC. 11:00 - 12:30 1.50 DHB N SFAL DECOMP RIG UP TEST EQUIPMENT TO TEST THE TWC. ATTEMPT TO TEST THE TWC FROM THE TOP 3 TIMES. ATTEMPTS FAILED. FLANGE BETWEEN MASTER AND SWAB VAVLE LEAKING. BLED OFF PRESSURE AND HAMMERED UP THE FLANGES. 12:30 - 13:30 1.00 DHB. ` P DECOMP TEST THE TWC FROM THE BOTTOM TO 2000 PSI FOR 30 MINUTES. GOOD TEST. LOST 50 PSI IN FIRST 15 MINUTES AND 15 PSI IN SECOND 15 MINUTES. ____ 1 13:30 - 15:00 1.50 DHB P DECOMP TEST THE TWC FROM THE TOP TO 3500 PSI FOR 10 MINUTES. GOOD TEST. LOST 30 PSI IN FIRST 5 MINUTES AND 10 PSI IN SECOND 5 MINUTES. 15:00 - 16:00 1.00 ~ DHB P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING HOSES. CLEAR CELLAR TO NIPPLE DOWN THE TREE. 16:00 - 16:30 0.50 _ WHSUR P DECOMP RIG UP AND PREPARE TO NIPPLE DOWN THE TREE AND ADAPTER FLANGE. 16:30 - 18:45 2.25 WHSUR P DECOMP NIPPLE DOWN TREE AND ADAPTER FLANGE. ADAPTER FLANGE SIEZED UP. HOLD HAZARD ASSESSMENT FOR BREAKING ADAPTER FLANGE LOOSE. WRAP ADAPTER FLANGE AND STEAM. HOOK UP TOP DRIVE ELEVATORS AND SLING TO HOLD TREE. USE 2 PORTA POWER HYDRAULIC JACKS TO BREAK ADAPTER FLANGE FREE. FMC FIXED THE BROKEN LDS THAT WAS RECOGNIZED PRE-RIG. TEST FITTED THE TUBING HANGER CROSS-OVER SCREWED IN 5.75 TURNS. Printed 7/1/2010 11:33:19AM North America -ALASKA - BP ~'~ ~~ 2 ~' Operation Summary Report __ Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (ft) _ _ 18:45 - 19:15 0.50 WHSUR P DECOMP REMOVE THE TREE AND ADAPTER FLANGE FROM THE CELLAR. 19:15 - 23:00 3.75 BOPSUR P DECOMP NIPPLE UP BOP STACK WITH 3' SPACER SPOOL. BOP CONFIGURATION IS AS FOLLOWS: - 13-5/8" ANNULAR - 7" FIXED RAMS - BLIND SHEAR RAMS I =2-7/8"'X 5" VBRS 23:00 - 00:00 , 1.00 BOPSUR i P DECOMP BODY TEST THE BOP EQUIPMENT TO 250 PSI j ~ LOW AND 3500 PSI HIGH. HAD LEAK IN THE FLANGE BETWEEN HCR AND MANUAL CHOKE, ALSO CHOKE 10 AND 11 HAD MINOR LEAKS. BLED OFF PRESSURE AND TIGHTENED UP. ---- 6/22/2010 00:00 - 01:00 1.00 BOPSUR P DECOMP BODY TEST7HE BOP EQUIPMENT AND CHOKE I ~ MANIFOLD TO 250 PSI LOW AND 3500 PSI HIGH 1 I FOR 5 CHARTED MINUTES EACH. GOOD TEST. 1 --- -- 01:00 - 09:30 8.50 - BOPSUR P - DECOMP TEST ROPE TO 250 PSI LOW AND 3,500 PSI HIGH: HOLD EACH TEST FOR 5 MINUTES ON THE CHART. TEST ANNULAR WITH 4"TEST JOINT. ~ ~ TEST UPPER 7" RAMS WITH 7" TEST JOINT AND LOWER 2-7/8" X 5" VBRS WITH 4" TEST JOINT. j TEST UPPER 7" RAMS, LOWER 2-7/8" X 5" VBRS, I BLIND SHEAR, ANNULAR, CHOKE MANIFOLD I VALVES, MANUAL KILL AND CHOKE LINE VALVES, HCR KILL AND CHOKE LINE VALVES, FLOOR VALVES, UPPER AND LOWER IBOP VALVES ON TOP DRIVE. -PERFORM ACCUMLATOR TEST. I i -ISSUES WITH THE MANUAL CHOKE AND SUPER I CHOKE BEING LOOKED AT BY THE MECHANIC. -CHANGING OUT THE KILL LINE HOSE. - AOGCC WITNESS OF TEST BY CHUCK i SCHEVE. -TEST WAS WITNESSED BY BP WSL CHRIS KOBUCK AND DOYON TOURPUSHER JOHN PIPER. -TESTED H2S AND LEL ALARMS. 09:30 - 12:00 2.50 WHSUR P DECOMP R/U DUTCH RISER, R/U DSM LUBRICATOR AND TEST TO 500 PSI. -PULL TWC. WELL STATIC. ~ -R/D AND UD DSM LUBRICATOR. 12:00 - 12:30 0.50 WHSUR P i - DECOMP UD DUTCH RISER 12:30 - 13:00 j 0.50 PULL ~ P ~ DECOMP R/U CASING TONGS AND SCHLUMBERGER CONTROL LINE SPOOLING UNIT. 13:00 - 14:00 1.00 PULL P ~ _ I DECOMP M/U LANDING JOINT WITH IJ4S XO AND SCREW INTO TUBING HANGER. 6-1/2 TURNS. BACK OUT LOCK DOWN SCREWS. 14:00 - 14:30 0.50 PULL P DECOMP PULL HANGER TO RIG FLOOR. HANGER CAME OFF SEAT AT 210K, TUBING CAME FREE AT 305K. UP WEIGHT 275K. 14:30 - 15:30 1.00 PULL P DECOMP CIRCULATE BOTTOMS UP AT 6 BPM WITH 1,500 PSI. NO GAS OR CUTTINGS AT BOTTOMS UP. Printed 7/1/2010 11:33:19AM r~ North America -ALASKA - BP P~Qe ~ ~' Operation Summary Report Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.tft (above Mean Sea level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 19:15 3.75 PULL P DECOMP UD TUBING HANGER, POOH LAYING DOWN 7", IJ4S, L-80 TUBING. RECOVERED 53 JTS. WITH CONTROL LINE. 26 CLAMPS AND 2 STAINLESS STEEL BANDS AND 1 SSSV. PULLED 270K TO UNSEAT THE TUBING HANGER. 19:15 - 20:15 1.00 PULL P DECOMP RIG DOWN CONTROL LINE SPOOLER, CLEAN THE FLOOR OF ANY UN-NEEDED TOOLS AND INSTALL A STRIPPING RUBBER. 20:15 - 00:00 3.75 PULL P __ DECOMP CONTINUE POOH LAYING DOWN 7", IJ4S, L-80 TUBING. TOTAL OF 149 JTS. 6/23/2010 ___ 00:00 - 04:00 4.00 _ PULL P DECOMP CONTINUE POOH U~YING DOWN 7", IJ4S, L-80 TUBING: 'TOTAL OF 257 JOINTS AND 1 CUT JOINT (18.73') WITH AVERAGE BREAK OUT OF ~ 30K FT/LBS: PIPE WAS IN VERY GOOD CONDITION WITH:NO VISUAL CORROSION OR PARAFIN: _ _ 04:00 - 05:00 _ 1.00 PULL P DECOMP CLEAR AND CLEAN THE RIG FLOOR OF ALL CASING EQUIPMENT AND DEBRIS ON THE FLOOR. - ------ 05:00 - 07:30 I - 2.50 BOPSUR P DECOMP CHANGE OUT UPPER RAMS TO 3-1/2" X 6" ~ ~ VBRS. -TEST RAMS TO 250 PSI LOW AND 3,500 PSI HIGH. -HOLD EACH TEST FOR 5 MINUTES ON THE CHART. GOOD TEST. - -- ------ - 07:30 - 09:00 1.50 BOPSUR P DECOMP SLIP AND CUT 72' OF DRILLING LINE. -SERVICE TOP_DRIVE _ _ 09:00 - 10:30 ( 1.50 EVAL P - DECOMP PJSM WITH ALL PERSONNEL INVOLVED. - _ ~ - -{ -- ~ _ -SPOT AND R/U SCHLUMBERGER E-LINE UNIT. - 10:30 - 15:45 ~ 5.25 EVAL P ~ DECOMP RIH WITH 8.5" GAUGE RING AND JUNK BASKET. -TAG UP AT 2,606'. (DV COLLAR ON 9-5/8" CSG TALLY) -POOH WITH GAUGE RING. -RECOVERED 2 PIECES OF ENCAPSULATION IN JUNK BASKET. -REPLACE GAUGE RING WITH 8.3" OD RING. -RIH, WENT THROUGH DV WITHOUT PROBLEMS. RIH TO 9,800' STARTED TAKING WEIGHT, PULLED TIGHT WHEN STARTING OFF BOTTOM. -RECOVERED 1-1/2 GALLONS OF ENCAPSULATION. _ 15:45 - 16:00 0.25 EVAL P _ DECOMP CHANGE OUT E-LINE TOOL TO USIT LOGGING TOOL. 16:00 - 18:45 2.75 EVAL P _ DECOMP RIH WITH USIT LOGGING TOOL TO 3000'. TOOL WAS HAVING TELEMETRY ISSUES. 18:45 - 19:15 0.50 EVAL N DFAL 3,000.0 DECOMP POOH WTIH USIT LOGGING TOOL AND LAYDOWN THE USIT TOOL. __ 19:15 - 22:00 _ 2.75 EVAL N DFAL 3,000.0 DECOMP CHANGE OUT USIT LOGGING TOOL AND RUN BACK IN THE HOLE TO 3000'. ~ 22:00 - 00:00 2.00 EVAL P DECOMP LOG FROM 3000' TO SURFACE WITH THE FIRST PASS OF THE USIT LOG. 6/24/2010 00:00 - 01:30 _ 1.50 EVAL P __ DECOMP RUN SECOND PASS FROM 2600' TO 1700' TO VERIFY CEMENT TOP. Printed 7/1/2010 11:33:19AM ~~ North America -ALASKA - BP Page 4 rsP42' Operation Summary Report _ - ___ _ - Common Well Name: J-13 ' AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 ~ End Date: X3-OOV33-C (3,373,960.00 ) I _ _ Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date ~ From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations (hr) (ft) ____ __ __ 01:30 - 03:00 1.50 EVAL P DECOMP RIG DOWN USIT TOOLS AND RIG UP TO RUN 9-5/8" EZSV. _ 03:00 - 05:00 2.00 EVAL P DECOMP RUN IN THE HOLE ON E-LINE WITH 9-5/8" EZSV A D SET AT 9639'. 05:00 - 06:30 1.50 EVAL P _ DECOMP POOH WITH E-LINE. 06:30 - 07:30 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E-LINE. 07:30 - 09:15 1.75 CLEAN P DECOMP PICK UP AND MAKE UP BAKER 9-5/8" CASING CUTTER. 09:15 - 10:45 1.50 PULL P DECOMP SINGLE IN THE HOLE ON 4" DRILLPIPE TO 1730'. ~ BREAK`CIRCULATION AT 5 BPM WITH 500 PSI. CONTINUE''IN THE:HOLE TO 1760'. 10:45 - 11:15 0.50 PULL P DECOMP LOCATE THE COLLAR @ 1741' AND RIH TO 1751' AND SET ON DEPTH TO CUT THE CASING. 11:15 - 12:00 0.75 PULL P DECOMP ~ RIG UP AND SPOT LRS, RIG UP THE CEMENT LINE ~ TO THE STAND PIPE. 12:00 - 13:30 1.50 PULL P DECOMP CUT9-5/8" CASING 1751'. ROTATE AT 60 RPM, 1 K fREE TQ AND 4-6K CUTTING TQ AT 6 BPM WITH 900 PSI. 13:30 - 15:00 1.50 PULL P DECOMP PUMP AND SPOT 18 BBLS OF 120 DEG DIESEL INTO THE DRILLPIPE, CLOSE THE BAG AND CONTINUE TO PUMP 82 BBLS OF HEATED DIESEL AT 1.5 BPM WITH 350 PSI OUT THROUGH THE CUT INTO THE OA TAKING THE RETURNS OUT ~ TO THE OPEN TOP TANK. ALSO HAD SMALL ~ AMOUNT OF RETURNS THROUGH THE FLUTES. FOLLOWED BY 20 BBLS OF 9.8 PPG HEATED BRINE AT 6 BPM WITH 800 PSI. 15:00 - 16:00 1.00 PULL P _ DECOMP ALLOW DIESEL TO SOAK ON THE OA TO HELP BREAK UP THE ARCTIC PACK. 16:00 - 17:30 1.50 PULL P DECOMP BEGIN DISPLACING OA TO THE OPEN TOP TANK WITH 270 BBLS OF HEATED 9.8 PPG BRINE FOLLOWED BY 35 BBLS OF ASAFE-SURF-0 SWEEP CHASED BY 175 BBLS OF 8.5 PPG SEAWATER. ALL FLUIDS PUMPED STARTING AT 1.5 BPM WITH 350 PSI STAGED UP TO 6 BPM WITH 1000 PSI. 17:30 - 17:45 I 0.25 PULL P DECOMP FLOW CHECK THE WELL. STATIC. _ _ _ 17:45 - 19:30 1.75 _ PULL P ~ DECOMP POOH AND LAYDOWN THE CASING CUTTER. ~ 19:30 - 20:00 0.50 PULL P DECOMP AAR WITH RIG CREW AND BAKER FISHING _ HAND. 20:00 - 20:30 0.50 PULL _ P DECOMP PICK UP AND MAKE UP THE 9-5/8" CASING SPEAR. 20:30 - 23:00 2.50 PULL P DECOMP PICK UP AND RIG UP THE 9-5/8" CASING EQUIPMENT. 23:00 - 00:00 1.00 PULL P DECOMP SPEAR INTO THE 9-5/8" HANGER AND PICKUP 15K TO CONFIRM LATCH. HAVE FMC BOLDS. 6/25/2010 i 00:00 - 01:30 1.50 CLEAN P DECOMP BREAK FREE 9-5/8" HANGER AND PACK OFF FREE AT 140K. PULL TO FLOOR AND BREAK OUT THE SPEAR. LAY DOWN THE PACK-OFF i AND HANGER. Printed 7/1/2010 11:33:19AM • North America -ALASKA - BP ~aa~ s oil Operation Summary Report -- _ ----- Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: _ Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To ~ Hrs Task ~ Code NPT NPT Depth ~ Phase Description of Operations (hr) (ft) ______ 01:30 - 03:00 ~ _ 1.50 CLEAN P DECOMP SCREW IN CROSS OVER AND MAKE UP TO THE ~ TOP DRIVE. CIRCULATE AND RECIPROCATE 9-5/8" CASING OVERBOARDING THE RETURNS TO THE ROCKWASHER. SAW SIGNIFICANT AMOUNT OF ARCTIC PACK FOR FIRST 30 BBLS, THEN IT DIED OFF. CIRCULATED A BOTTOMS UP (130 BBLS) STARTING AT 3 BPM WITH 120 PSI STAGING UP TO 8 BPM WITH 120 PSI. 03:00 - 07:00 4.00 CLEAN P DECOMP BEGIN BREAKING OUT AND LAYING DOWN THE 9-5/8" N-80 47# BTC CASING. RECOVERED 44 ~ JOINTS OF CASING PLUS 10.23' CUT JOINT OF ~ ' CASING.. _ 07:00 - 08:00 ~ 1.00 _ CLEAN P _ _ DECOMP R/D CASING HANDLING EQUIPMENT. ~ -CLEAR AND CLEAN RIG FLOOR. 08:00 - 09:00 1.00 CLEAN P DECOMP BRING BHA TO RIG FLOOR AND BEGIN TO M/U 9-5/8".DRESS-OFF BHA. 09:00 - 10:00 1.00 CLEAN P bECOMF HOLD MEETING WITH CREW, ROTARY DRILLING MANAGER'MIKE SCHULTZ AND FIELD SUPERINTENDENT ALAN MADSEN. DISCUSS WELL CONTROL. 10:00 - 11:00 1.00 - CLEAN ' P DECOMP; M/U 9-5/8"DRESS-OFF BHA. BHA = 9-5/8" DRESS-OFF SHOE, WASHPIPE EXT, 9-5/8" DRESS-OFF MILL(INSIDE WASHPIPE), 11-3/4" WASHOVER BOOT BASKET, DOUBLE PIN SUB, 13-3/8" SCRAPER, BIT SUB, XO, FLOAT SUB, BUMPER SUB, (9) 6-3/4" DC'S, XO. TOTAL BHA LENGHT = 313.32' 11:00 - 12:00 1.00 CLEAN - P DECOMP RIH WITH DRESS-OFF BHA ON 4" XT-39 DRILLPIPE FROM THE DERRICK FROM 313' TO 87T 12:00 - 12:30 0.50 CLEAN P DECOMP CIRCULATE AND RECIPROCATE AT 877' PUMPING AT 9 BPM WITH 400 PSI ICP AND DECREASED TO 5 BPM WITH 200 PSI TO KEEP ARCTIC PACK IN THE RETURNS. 12:30 - 12:45 0.25 CLEAN P DECOMP FLOW CHECK THE WELL. STATIC. 12:45 - 13:00 0.25 CLEAN P DECOMP RIH TO 1751' WITH DRESS OFF ASSEMBLY. ~ 13:00 - 13:45 0.75 CLEAN P DECOMP DRESS OFF STUMP AT 80 RPM WTIH TO 2-8K PUMPING AT 3 BPM. SHUT DOWN PUMPS AND WORKED OVER THE STUMP 3 TIMES WITH NO ISSUES. TURNED THE PUMPS BACK ON AND WORKED OVER THE STUMP 3 MORE TIMES WITH NO ISSUES. 13:45 - 14:30 0.75 __ CLEAN P DECOMP PUMP 50 BBL SAFE-SURF-O SURFACE TO SURFACE AT 8 BPM WITH 220 PSI. 14:30 - 15:30 1.00 CLEAN P DECOMP POOH FROM 1752' TO 313'. 15:30 - 17:30 2.00 CLEAN P DECOMP RACK BACK 6.75" DC'S IN DERRICK. LAYDOWN _ DRESS OFF ASSEMBLY. 17:30 - 18:00 0.50 CLEAN P DECOMP CLEAN AND CLEAR THE RIG FLOOR. 18:00 - 19:00 1.00 CASING P TIEB1 RIG UP TO RUN 9-5/8" CASING. 19:00 - 19:30 0.50 CASING P TIE61 PJSM WITH ALL RIG HANDS AND SERVICE HANDS. Printed 7/1/2010 11:33:19AM North America -ALASKA - BP Page 6 cli~- Operation Summary Report _--- Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task i Code NPT NPT Depth Phase Description of Operations (hr) ~ (ft) _ _ 19:30 - 23:00 3.50 CASING __ P ___ TIEB1 RIH WITH 44 JTS. OF 9-5/8" L-80 47# HYD. 563 TORQUED UP TO 15,800 FT/LBS. PICK UP AND SLACK OFF WT. 105K. 23:00 - 23:30 0.50 CASING P TIEB1 ENGAGE THE STUMP @ 1752'. SET DOWN SOK PICK UP TO 250K TO ENSURE GRAPPLE IS SET. 23:30 - 00:00 0.50 CASING _ P TIE61 RIG DOWN CASING TONGS AND EQUIPMENT. 6/26/2010 00:00 - 01:00 1.00 CASING P TIE61 RIG UP LONG BAILS AND CEMENT EQUIPMENT. 01:00 - 02:00 1.00 CASING P TIE61 PULL 205K ON STRING, PRESSURE TEST THE I ~ CASING. TO 1000 PSI FOR 10 CHARTED ~ MINUTES. GOOD TEST. INFLATE ECP AT 1600 PSI AND STAGE UP TO 2000 PSI TO CLOSE. TEST AT 2000 PSI FOR 10 MINUTES CHARTED. GOOD TEST: BLEED TO 0 AND THEN PRESSURE UP TO 2900 PSI`TO OPEN THE HES ES CEMENTER. OBSERVE PRESSURE DROP TO 100 PSI'AND FEEL`SHIFTING OF PIPE WHEN ES CEMENTER OPENED. _ 02:00 - 04:30 2.50 CEMT N' FLUD TIE61 CIRCULATE @ 4 BPM WITH 120 PSI. WAITING ON CH2MHILL TRUCKS FOR CEMENT JOB. ------ 04:30 - 05:00 0.50.. ~ CEMT P TIE61 4 HOLD PJSM WITH SCHLUMBERGER, ~ HALLIBURTON, BAKER, RIG HANDS, TRUCK j ~ PUSHER, MUD ENGINEER, TOURPUSHER, AND BP f WSL ABOUT UPCOMING CEMENT JOB. 05:00 - 07:00 2.00 _ __ CEMT P TIE61 PUMP 5 BBLS OF 8.5 PPG SEAWATER TO FILL THE LINES. SHUT DOWN AND PRESSURE TEST TO 3500 PSI. GOOD TEST. PUMP 126 BBLS (605 SX) OF 15.8 CLASS G NEAT CEMENT WITH GAS BLOK WITH A 1.17 CU.FT/SK. SHUT DOWN DROP ES CEMENTER CLOSING PLUG. DISPLACE AT 5.2 BPM WITH 300 PSI UNTIL PLUG IS CAUGHT THEN PRESSURE WENT UP TO 403 ICP ~ AND 1099 FCP. CEMENT AT SURFACE WITH 106 BBLS AWAY SLOW THE PUMPS TO 2.1 BPM. CHOKING 400 PSI BACK PRESSURE TO SQUEEZE 10 BBLS OF CEMENT INTO THE 13-3/8" CASING LEAK AT 4' 3"BELOW SURFACE. ~ STARTED SEEING RETURNS THROUGH THE ~ FLUTES INTO THE CELLAR WITH 8 BBLS SQUEEZED AWAY. AT 10 BBLS SQUEEZED OPEN UP CHOKE AND CONTINUE DISPLACING AT 2 BPM WITH 800 PSI. BUMP ES CEMENTER CLOSING PLUG AT 12 POSITIVE INDICATION OF ES CEMENTER CLOSED AT THE RIG FLOOR AND PRESSURE SPIKE TO 2100 PSI. BRING PRESSURE UP TO 2500 PSI AND TEST CASING FOR 10 MINUTES CHARTED. BLEED OFF PRESSURE AND CHECK THE FLOATS. FLOATS HELD. TOTAL OF 10 BBLS CEMENT SQUEEZED AWAY AND 11 BBLS OF CEMENT AT SURFACE. 07:00 - 07:30 0.50 CEMT P DECOMP FLUSH BOP STACK AND LINES WITH CITRIC ACID PILL. Printed 7/1/2010 11:33:19AM Common Well Name: J-13 Event Type: RE-ENTER- ONSHORE (RON) Project: Prudhoe Bay Rig Name/No.: DOYON 141 Rig Contractor: DOYON DRILLING INC. Active Datum: J-13 @69.1ft (above Mean Sea Level Date From - To Hrs 07:30 - 08:00 0.50 08:00 - 09:30 1.50 09:30 - 11:30 2.00 11:30 - 13:00 1.50 13:00 - 14:00 1.00 14:00 - 15:30 1.50 15:30 - 16:30 1.00 16:30 - 17:15 0.75 17:15 - 17:45 0.50 17:45 - 19:00 1.25 19:00 - 20:30 1.50 20:30 - 22:30 ( 2.00 " North America -ALASKA - BP Operation Summary Report Start Date: 6/20/2010 End Date: Site: PB J Pad Spud Date/Time: Page 7 o1~~ AFE No X3-OOV33-C (3,373,960.00 ) Rig Release: UWI: Task Code NPT NPT Depth Phase Description of Operations (ft) CEMT P DECOMP RIG DOWN CEMENTING LINES AND CEMENTING HEAD. BOPSUR P DECOMP NIPPLE DOWN 13-5/8" BOP STACK AND LIFT UP TO SET SLIPS AND CUT CASING. WHSUR P DECOMP INTSALL FMC 9-5/8" EMERGENCY SLIPS AND SET WITH 100K -,- - WHSUR P i DECOMP PULL BELL NIPPLE AND INSTALL BOOT PROTECTOR. SET BACK BOP STACK AND __ ___ REMOVE TUBING SPOOL. WHSUR P DECOMP INSTALL FMC 9-5/8" PACK-OFF AND RUN IN LOCK DOWN SCREWS. WHSUR P DECOMP INSTALL FMC 13-5l8", 5K,TUBING SPOOL SFRT 9-5/8" PACK-OFF TO 3,800'PSI FOR 30 MINUTES. _ GOOD TEST. BOPSUR P DECOMP NIPPLE UP 13-5/8'' BOP STACK, CUT 4" OFF OF THE RISER. BOPSUR P DECOMP BODY TEST THE BOP'S 3.5" X 6" RAMS, HCR CHOKE, AND KILL LINE TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH TEST CHARTED. GOOD TEST. CLEAN P DECOMP' PICK UP CEMENT DRILL OUT BHA UP THE BEAVER SLIDE. CLEAN. P DECOMP PICK UP AND MAKE UP CEMENT DRILL OUT BHA TO 316'. CLEAN P_ DECOMP RIH FROM 316' TO 1688' ON 4"DRILL PIPE. T~t;r_ED UP ON GEMENTAT 1fi88'_ CLEAN- P DECOMP TAGGED UP ON CEMENT AT 1688' AND DRILL OUT SHOE TRACK TO 1710'. -80 RPM WITH 2K TO -8 BPM WITH 400 PSI. 15-20K WOB. -UP WT. 76K /ROT WT. 77K /DOWN WT. 77K. 22:30 - 22:45 0.25 _ CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 12 BPM WITH 800 PSI WHILE ROTATING AND RECIPROCATING THE _ PIPE. 22:45 - 00:00 1.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE WITH 4" DRILLPIPE FROM 1728' TO 3137'. 6/27/2010 00:00 - 05:15 5.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE FROM 3137' TO 9627'. WASHED DOWN FROM 9627' TO 9631'. TAGGED EZSV AT 9631'. PUMPED AT 3 ~ _ BPM WITH 150 PSI. 05:15 - 07:00 1.75 ~ CLEAN P _ DECOMP CIRCULATE A HI-VIS SWEEP SURFACE TO ~, SURFACE. PUMP AT 380 GPM WITH 1,200 PSI 07:00 - 11:30 - 4.50 I _ CLEAN P DECOMP POOH STANDING BACK 4" XT-39 DRILLPIPE IN ~ DERRICK FROM 9,631' TO 225'. MAINTAIN CONTINIOUS HOLEFILL. HOLE TOOK CORRECT VOLUME 11:30 - 13:00 1.50 CLEAN P DECOMP STAND BACK 6-3/4" DRILL COLLARS. BREAK OUT AND L/D BHA. 13:00 - 13:30 0.50 CLEAN _ P DECOMP CLEAR AND CLEAN RIG FLOOR. 13:30 - 14:30 1.00 CLEAN P DECOMP CLOSE BLIND/SHEAR RAMS AND TEST 9-5/8" CASING TO 3 500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST Printed 7/1/2010 11:33:19AM r~ • North America -ALASKA - BP Page ~ ate' Operation Summary Report Common Well Name: J-13 i AFE No Event Type: RE-ENTER- ONSHORE (RON) i Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 15:00 0.50 WHSUR P DECOMP M/U FMC RUNNING TOOL AND PULL WEAR BUSHING. 1 - _ 15:00 - 19:45 4.75 BOPSUR P DECOMP R/U TEST ASSEMBLIES, FILL BOP STACK WITH WATER AND PURGE AIR FROM SYSTEM.TEST BOPE TO 250 PSI LOW AND 3,500 PSI HIGH. HOLD EACH TEST FOR 5 MINUTES ON THE CHART. TEST ANNULAR WITH 4" AND 4-1/2" TEST JOINTS. TEST UPPER 3-1/2" X 6" RAMS ~ i WITH 4 AND 4-1/2" TEST JOINT AND LOWER 2-7/8" X 5"VBRS WITH 4" AND 4-1/2" TEST JOINTS: TEST UPPER 3-1/2"X 6"VBRS, LOWER 2-7/8" X 5" VBRS, BLIND SHEAR, ANNULAR, CHOKE MANIFOLD,VALVES, MANUAL KILL AND CHOKE LINE VALVES, HCR KILL AND CHOKE LINE VALVES, FLOOR_VALVES, UPPER AND LOWER IBOP VALVES ON TOP DRIVE. -PERFORM ACCUMLATORTEST. - AOGCC WAIVED WITNESS OF TEST BY BOB NOBLE. - -.TEST WAS WITNESSED BY BP WSIS BILL BURSON AND CHRIS KOBUCK AND DOYON TOOLPUSHERS CHARLIE HUNTINGTON AND ERIC RODLAND. -TESTED H2S AND LEL ALARMS. ____ 19:45 - 20:15 0.50 BOPSUR P DECOMP INSTALL THE WEAR RING. 20:15 - 20:30 0.25 BOPSUR P DECOMP AAR ON BOP TESTING WITH RIG CREW. 20:30 - 22:30 2.00 STWHIP P WEXIT PICK UP AND MAKE UP WHIPSTOCK BHA. 22:30 - 23:00 0.50 STWHIP P WEXIT RIH TO 471'. 23:00 - 00:00 1.00 STWHIP N DEAL WEXIT SHALLOW TEST MWD WITH 450 GPM AND 500-800 PSI. MWD TOOL FAILURE. 6/28/2010 _ 11:00 - 12:00 ___ 1.00 STWHIP _ P ___ WEXIT M/U TOP DRIVE AND ORIENT WHIP STOCK, P/U WEIGHT 210K, S/O WEIGHT 125K, 500 GPM WITH 2,400 PSI. ORIENT WHIPSTOCK TO 64 DEGREE. SET DOWN ON TOP OF EZSV AT 9,631', SET DOWN 25K WEIGHT AND THEN P/U 35K OVER. SHEAR PIN IN WHIPSTOCK, HAD TO WORK PIN I TO SHEAR IT. SHEARED WITH 58K DOWN. _-~ _ _ t 00:00 - 03:00 I 3.00 STWHIP N DFAL WEXIT TROUBLE SHOOT MWD ISSUES. DIRECTIONAL ~ PULSER NOT BEING DETECTED. CHANGED OUT I ENTIRE TOOL AND SHALLOW TESTED AGAIN. TOOL PASSED SHALLOW TEST. 03:00 - 11:00 8.00 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA ON STANDS OF 4" DRILL PIPE TO 9,593' 12:00 - 14:00 2.00 STWHIP P WEXIT PJSM WITH ALL PERSONNEL. DISPLACE WELL FROM SEAWATER TO 10.5 PPG LSND AT 380 GPM WITH 2,200 PSI. -ESTABLISH SLOW PUMP RATES -MUD PUMP #1 30 SPM AT 550 PSI -MUD PUMP #2 30 SPM AT 590 PSI MUD WT. IN AND OUT 10.5 PPG ~oP ~3P~ Printed 7/1/2010 ~11:33:19AM J'~3A r1 North America -ALASKA - BP Page 9 ofd. Operation Summary Report Common Well Name: J-13 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J-13 @69.1ft (above Mean Sea Level) Date ! From - To Hrs Task Code ! NPT NPT Depth i Phase Description of Operations (hr) (ft) 14:00 - 00:00 10.00 STWHIP P WEXIT MILL WINDOW FROM 9 609' TO 9626'. 80 RPM WITH 5K TO. ROT WT. 150 K PUMPING AT 12 BPM WITH 3250 PSI. TOP OF WINDOW AT 9609' AND BOTTOM OF WINDOW AT 9626'. MILL AHEAD IN FORMATION TO 9640'. __ 6/29/2010 __ 03:15 - 07:00 3.75 STWHIP P WEXIT PULL 5 STANDS AND FLOW CHECK. WELL STATIC. PUMP DRY JOB AND POOH RACKING BACK 4" DRILLPIPE. CALCULATED HOLE FILL 52.4 BBLS, ACTUAL HOLE FILL 55.5 BBLS 00:00 - 00:30 0.50 ____ STWHIP P WEXIT CONTINUE TO MILL FROM 9640' TO 9651'. -10 BPM WITH'2300 PSI j - 100 RPM WITH SK TO, 20 25K WOB _ 00:30 - 02:00 _ 1.50 STWHIP P i WEXIT CIRCUU~TE AND RECIPROCATE THROUGH THE WINDOW WHILE PUMPING AT 12 BPM WITH 2300 PSL PUMP 35,BBL HI-VIS SWEEP FOLLOWED BY ! ~ 880 BBLS. SAW MINIMAL AMOUNTS OF METAL SHAVINGS COME ACROSS THE SHAKERS. TOTAL OF APPROX. 226 LBS OF METAL - CUTTING BACK TO SURFACE DURING MILLING OPERATIONS AND CIRCULATION. TURN OFF THE PUMPS AND WORK THROUGH THE WINDOW 3 TIMES WITH NO DRAG SEEN. 02:00 - 02:15 0.25 j STWHIP P _ WEXIT PULL UP INTO THE SHOE AND ESTABLISH SPR'S AT 9607. - PUMP #1: 15 SPM WITH 420 PSI AND 20 SPM WITH 440 PSI. -PUMP #2: 15 SPM WITH 410 PSI AND 20 SPM WITH 440 PSI. MUD WT IN AND OUT 10.5 PPG __ 02:15 - 02:30 0.25 STWHIP _ P WEXIT RIG UP TO PERFORM F.I.T. TO 12.5 EMW. 02:30 - 03:00 0.50 STWHIP P WEXIT PERFORM F.I.T. TO 12.5 EMW. 10.5 PPG MUD IN THE HOLE AND 810 PSI SURFACE PRESSURE. HELD FOR 10 MINUTES AND 0-PSI BLED OFF DURING TEST. _ 03:00 - 03:15 0.25 _ STWHIP P WEXIT RIG DOWN AND PREPARE TO POOH. 07:00 - 10:00 3.00 STWHIP P WEXIT MONITOR WELL AT BHA, WELL STATIC. -L/D DRILL COLLARS AND MWD TOOL -UD MILL ASSEMBLY, STARTER MILL WAS 1/4" UNDER GAUGE, LOWER AND UPPER STRING MILLS WERE IN GAUGE. 10:00 - 10:30 0.50 ~ _ STWHIP P WEXIT CLEAR WHIPSTOCK MILLING BHA FROM RIG FLOOR. 10:30 - 12:00 1.50 STWHIP P WEXIT PULL WEAR BUSHING, M/U STACK WASHING TOOL AND FLUSH BOP STACK AND WELLHEAD, -CLEAN OUT FROM UNDERNEATH SHAKERS AND CLEAN POSSUM BELLY. __ 12:00 - 12:30 0.50 ___ STWHIP P I _ WEXIT INSTALL WEAR BUSHING. Printed 7/1/2010 11:33:19AM TRFE `- 6" CAMERON WELLHEAD = FMC ACTUATOR = 6" OTIS KB. ELEV = _..._ _ 69.07' BF. ELEV - 41.87 KOP = 2300' Max Angle = 61° @ 8598' Datum MD = 11043' Datum TV D = 8800' SS _~,'., J -13A 9-5/8" CSG PATCH, 47#, HYD563, ID = 8.681" 13-3/8" CSG, 72#, L-80, ID = 12.347" I 1754' 1 Minimum ID = 3.725" @ 10615' 4-1 /2 XN NIPPLE SAFETY NOT HROME TBG &LNR 1708' ~ HES CEMENTER 2190' 4-1/2" X NIP, 9CR, ID = 3.813" 260 9-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3957 3705 44 MMG DCK RKP 0 07/09/10 3 6849 5891 42 MMG DMY RK 0 07/09/10 2 9164 7417 47 MMG DMY RK 0 07/09/10 1 10445 8339 42 KBG-2 DMY BK 0 07/09/10 9463' ~ 9-5/8"x7" ZXPN LTP w /RS PROFILE ID = 6.19" 9479' 9-5/8"x7" BKR HMC LNR HGR, ID = 6.18" 9-5/8" CSG MILLOUT WINDOW (J-13A): 9609' -' 9-5/8" CSG, 47#, N-80, ID = 8.681" PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: ° @ ' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" TBG, 12.6#, 13CR80, ..0152 bpf, ID = 3.958" 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" I 10771' I PBTD 4-1/2" LNR, 12.6#, 13CR80, ..0152 bpf, ID = 3.958" -14-1 /2" HES X NIP, ID = 3.813" 09' 7" x 4-1/2" HES TNT 13CR PKR, ID = 3.856" 10544' 4-1/2" HES X NIP, ID = 3.813" 10615' 4-1/2" HES XN NIP, ID = 3.725" 10620' 7"x4-1/2" HRD-E ZXPN LTP w /GS PROFILE, ID = 4.18" 10637' 7"x4-1/2" BKR FLIX LOCK LNR HGR, ID = 4.34' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/80 ORIGINAL COMPLETION 07/10/10 D141 SIDETRACK (J-13A) 07/15/10 SV DRLG HO CORRECTIONS PRUDHOE BAY UNff WELL: J-13A PERMff No: 2100510 API No: 50-029-20497-01 SEC 9, T11 N, R13E BP F~cploration (Alaska) os/3ato $ChlUlilbBl'~~I' Alaska Data & Consulting Services 2525 Gambell Street, Suke 400 Anchorage, AK 99503-2938 ATTN: Beth Well Job # N0.5553 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Calor CD J-13 K-O66 PWDW3-1 6148-00109 BCUE-00027 BCRC-00027 USIT MEM PROD PROFILE ~_ ~ RST WFL .> ~1'` /` ~ 06/23/10 06/14/10 06/22/10 / 1 1 1 1 1 1-11/SN-04 8148-00107 LDL ~ - 06/12/10 1 1 3-01/N-29 BD88-00021 MEM INJ. R FILE 06/13/10 1 1 15-168 15-166PB1 10AKA0047 t0AKA0047 OH MWDlLWD EDIT OH MWD/LWD EDIT 04/04/10 04/01/10 2 2 1 1 03-22 BSJN•00047 RST .- 03/30/10 1 1 G-30C AZ2F-00038 MCNL 04/22/10 1 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ~~ Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 . TSB ~' ^ ~!; ~.~~.1~~ ~` ,j ~` ,... ~ A Q - J-13A Change in Verbiage • • Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, June 03, 2010 3:59 PM To: 'Thompson, Jacob' Cc: DOA AOGCC Prudhoe Bay ~.~.. Subject: RE: J-13A (PTD 210-051 and PTD 1r 'BOP variences for Sidetrack well. Jacob, The delay in LPRs' testing is approved ... you have it actually inserted after Step 7, I believe you want it right after step 5 (pulling the 7" tubing) . Regarding the request to forego C/O to 9 5/8" BOP rams... your argument to not swap rams has merit. With a shallow 13 3/8" surface casing leak the rams become essentially diverters. You will have two tested barriers down-hole to isolate from the reservoir already. 1) Cement plug over perfs that is pressure tested... 2) 9 5/8" EZSV at 9640' and which will be tested to 3500 psi I will replace the page 8 and 9 (Operations Summary) of the wellplan with the version attached. Regards, ~; ~Rr a~ `~~ Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 {office) 444-3433 (cell) From: Thompson, Jacob [mailto:Jacob.Thompson@BP.com] Sent: Thursday, June 03, 2010 7:44 AM To: Schwartz, Guy L (DOA) Cc: Egbejimba, Uchenna J Subject: J-13A Change in Verbiage Guy, Could you please approve of the change in verbiage to step 5 of the operational summary for J-13A. (requesting delayed testing of the LPRs) Atso we do not plan on changing out to 9-518" rams prior to pulling our 9-5/8" CSG, so step 11 will not be done. This step is eliminated because there is a surface CSG leak in the 13-3/8" 4'-3" from surface. There are two tested barriers in the well at this time and the rams don't buy us any assurance because a well control incident would leak out of the surface CSG. Please give me a call if you have any question. «J-13A Draft Permit to drill Revision.doc» Jacob Thompson 6/3/2010 J-13A Change in Verbiage GPB Rotory Drilling Cell: (907J 8544377 Dice: (907J 5645579 Page 2 of 2 6/3/20 i 0 u Greg Hobbs Engineering Team Leader 2 BP Exploration (Alaska), Inc. ~~~~~'`-='- ~Pti ~ ~ ~~)~~ P.O. Box 196612 ~b Anchoragc, AK 99519-GG 12 ~' Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-13 Sundry Number: 310-106 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair D~ DATED this ~ day of April, 2010. Encl. (~ ~ STATE OF ALASKA ~~a~ ALASK~L AND GAS CONSERVATION COMMIS~I APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 RECEIVE, APR 0 7 2010~pp 1. Type of Request: ~ ^ Abandon ®Plug for Redrill ' ^ Perforate New Pool ^ Repair Well ^ Change Appro ~ ~+ ^ Suspend ^ Plug Perforations ^ Perforate ^ ull Tubing ^ Time Extension ^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate L10 Alter Casing ^ Other H. 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 180-083 3. Address: ^ Service ^ Stratigraphic 6. API Number. P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20497-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU .1-13 Spacing Exception Required? ^ Yes ®NO 9. Property Designation: 10. Field !Pool(s): ADL 028281 - Prudhoe Bay Field / Prudhoe Bay Oil Pool 11- PRESENT'WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11800' - 9447'- 11669' 9332' 10300' 11600' Casin Len Size MD ND Burst Golla Structural Conductor 1 11 1 Surface 267 ' 1 - / " 67 ' 2 4 70 Intermediate 107 0' - / " 1 78 ' 9 ' 870 7 Production Liner 1531' 7" 10 ' - 117 8 4' - 44 ' 7 2 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11283' - 11308' 9000' - 9021' 7", 26# x 4-1/2", 12.6# L-80 10333' Packers and SSSV Type: 9-5/8" x 7" Guib. Polar Packer Packers and SSSV 10226' / 8176' MD (ft) and ND (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory Development ^ Service ^ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: April 20, 2010 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned 16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ~ 1 Plugged ^ SPLUG Commission Representative: SL/S~ / 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Jacob Thom son 564-5579 Printed Name Greg Ho r' Title Engineering Team Leader Prepared ey Name/Number: Signature Phone 564-4191 Date ®~ Terrie Hubble, 564-4628 Commission Uss Onl Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 ~ O " / O ~J ^ Plug Integrity Ia'AOP Test ^ Mechanical Integrity Test ^ Location Clearance ~ 3soo ps` BoP Ts ~ _ Other: L ,o SL Ahrt u. f'4r Q$ T ~+~ ~ZSf~a / Subsequent Form Required: 1 ~ . 4/ Q APPROVED BY ~ / t~ ~ Approved By: COMMISSIONER THE COMMISSION Date ` Form 10-403~Rev~s~d i~2/2009 ~o~us a~ o~ Boa R I G ~ ~ A L ~~ ~'.~,o /~~ t/~~ a Submit In Duplicate J-13 Well Type: Producer Current Status: The well is currently shut-in. MIT - IA Passed to 3000 psi 11/06/09 MIT - OA Failed 03/21/10 • Request: Approval is requested for the P&A of PBU well J-13. J-13 has a surface casing leak at 4'3", classifying it as a "Not Operable". Additionally, past wellwork has likely damaged the perforation interval rendering it non productive. The well is completed with 7" tubing and has no gas lift mandrels for kicking off purposes. Without GLV's we are unable to kick off and sustain flow thru the 7" tubing. 13 Scope of Work: The sidetrack plan for(an Ivishak Z2 producer) includes the following during pre- rig operations: laying cement across the perforations, cutting the 7" tubing 200' below the planned whipstock exit. The exit will be from the 9-5/8" casing at approximately 9596' with an 8.5" milling assembly. The 8.5" hole will be drilled from to the top of the Sag River where a 7" will be run to 150' inside the 9-5/8" casing. The 7" liner will be fully cemented. The production hole will be drilled with a 6" BHA. The well will run through the Ivishak formation. The production liner will be 4-1/2" L-80 and fully cemented. Tubing will be 4-1/2" 13Cr, tied into the top of the production liner. MASP: 2403 psi i Estimated Start Date: 04/20/2010 ~ y ~, iv Drilling Engineer: Jacob Thompson, 564-5579 • J-13A Operations Summary Pre-Riq Operations: 1. F Pressure Test (to verify Abandonment 8< Barriers) Note: 13-3/8" surface casing has a leak 4' 3" from surface MIT-IA to 3,000psi Passed 11 /6/2009 MIT-T tp 3000 psi Passed 5/20/2009 PPPOT-T to S,000psi PPPOT-IC to 5,000psi Function test casing and tubing LDS. Back out to ensure full movement as the 9 5/8" will be cut and pulled 2. S Pull SSSV 3. S Pull 2-7/8" PXN plug & nipple reducer @ 10300, Drift Tubing to 10300' RU Coil Unit, RIH and Tag PBTD (Fish @ ~966~. Begin laying in 15.8 Class G cement 1 for 1 !/,G~o' 1267' of 7" 29# w/ capacity of .0371 bbls/ft = 47.1 bbls of cement ~ 5. C 107' of 4-1/2" w/ capacity of .0152 = 1.6 bbls of cement ~ 20' of 7" 26#w/ capacity of .0383 = 5.6 bbls of cement ~ Desired Top of cement 10080' w/ BOC of-~96~6L; a total of 54.3 bbls pumped. 6. S Drift tubing, tag TOC ~~~ ~ °O 7. F Pressure Test Tubing to 3500 psi 8. E RIH and jet cut tubing @9800' 9. O Circulate the well to seawater. Freeze-protect the IA and tubing with diesel to 2,200'. 10. O Bleed all pressures to zero. Set BPV. Secure well. 11. O Remove the well house. If necessary, level the pad. Install impermeable cellar liner Riq Operations: 1. MI / RU rig 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. 5. R/U & pull 7" tubing from the cut depth at 9800' MD. 6. R/U & Run 9-5/8" casing scraper to 9750' 7. RU E-line and RIH w USIT (in corrosion mode)/CCL to 9800' and log to surface to determine TOC. 8. RIH with HES EZSV bridge plug on E-line and set at 9640' MD, as required to avoid cutting a casing . collar while milling the window. Test CSG to 3,500 psi. POOH. 9. RIH w/ 9-5/8" Tubing Punch. Punch holes above stage collar at 2603'and test for circulation. TOC ' estimated at 2200'. 10. MU a Baker 9 $/8" multi-string cutting assembly. RIH picking up DP to planned cut depth above the DV PKR and below the TBG punch. Cut the 9 5/e" casing per Baker representative instructions and as determined from USIT log. Spot a pill of hot diesel for 30-60 minutes at cut, then pump 40 bbl of Safe-Surf-O mixed in fresh water, followed by heated brine (2.5 volumes) to remove Arctic Pack. POOH, L/D assembly. 11. Change out to 9 5/8" rams, and test rams. 12. BOLDS, RU/MU casing spear assembly, and unseat the 9 5/s'. Circulate the annulus. Pull the 9 5/s" casing from the cut. 13. RIH, clean-out the 13'/8" casing, and the 9 5/8" casing stub, dress off the 9 g/a" casing stub for easier access throughout the intermediate section. 14. Run new gas-tight 9-5/8" 47# TCII w/patch, ECP, and ES-cementer, land patch, pull 100K over string wt and maintain, inflate & close ECP, open cementer and pump OA full of latex cement. Once the cement at surface, SI returns and squeeze cement thru SC leak and into lined cellar until plenty of clean cement returned into cellar 15. Split stack below tubing spool, install emergency slips and primary pack-off, slack off the 100K hanging wt, Wachs cut the 9-5/8" 16. NU new tubing spool w/secondary pack-off, test pack-offs, test all breaks 17. WOC. Drill out ES Cementer and cleanout to cement retainer. PT casing and POH. 18. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. ' 19. P/U and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whipstock and set on EZSV bridge plug. Shear off of whip stock. 20. Displace the well to +/-10 ppg LSND based milling fluid. Completely displace the well prior to 3!0 ~ 1 UG 21. Mill window in 9 5/e' casing plus approximately 20' beyond middle of window. Circulate well bore clean. 22. Pull up into 9 5/e" casing and perform LOT. POOH. 23. M/U 8-'/2" GR/RES/PWD/MWD assembly. RIH, kick off and drill the 8-%2° intermediate section with LSND drilling fluid. 24. Drill ahead to the 7" csg point at top of the Sag River, as per the directional plan. Casing point is estimated at 10763'. Circulate the well clean, short trip as needed. POH. 25. MU and run 7", 29#, L-80, intermediate liner. Circulate and condition the hole. 26. Cement the entire 7" liner. Test floats on bump. ~ 27. Test the liner and 9-5/8" casing to 3,500 psi for 30 charted minutes. 28. M/U the first 6-%a' Dir/GR/Res/Neu/Den assembly with an insert bit. Pick Up DP as necessary. 29. RIH, Drill out of cement and 7" liner float equipment. 30. Displace to 8.4 ppg Flo Pro Fluid. 31. Continue drilling out the 7" shoe plus ~20' new formation, pull up into the shoe and perform a FIT. 32. Drill the 6-'/8' production interval as per directional plan to estimated TD of 11541'. 33. POOH. UD BHA. 34. MU and RIH to bottom with 4 '/", 12.6#, 13Cr liner. This will include 150' liner lap inside the 7" Casing 35. Cement the liner. 36. Set liner top packer and displace well to clean seawater above the liner top. A pert pill will be left in the 4-'/2" liner. 37. POOH, L/D LRT. 38. Pressure test casing and liner to 3,500 psi for 30 minutes. "'~ 39. R/U and run a 4-'/2", 12.6#, 13Cr, VamTop tubing completion, stinging into the 4-'/" liner tie back sleeve. 40. Space out and make up tubing hanger per FMC Rep. 41. Land the tubing hanger, and run in lock down screws. 42. Circulate Corrosion Inhibitor. 43. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 44. Shear Circulating Valve 45. Set a TWC and test to 1,000 psi from below and above to 4000 psi. , 46. Nipple down1 the BOPE. Nipple up the tree and test to 5,000 psi. 47. Pull TWC. Freeze protect the well to 2,200' TVD. Set BPV and Secure the well. 48. RD and Move Off. Post-Rip Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed 5. Perforate well ~ i F.,' TREE= 8" CAMERON WELLHEAD= FMC ACTUATOR = 6" OTIS KB. ELEV - 69.07 BF. ELEV - 41.87 KOP = 2300' Max Angle = 61 @ 8600' Datum MD = 11105' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" Minimum ID = 2.313" @ 10300' 2-7/8" XN NIPPLE REDUCER 7" TBG, 26#, L-80, .0383 bpf, ID = 6.276" TOP OF 7" LNR J-13 ~' V 4-1/2" OTIS X NIP, ID = 3.813" 10300' -14-1/2" OTIS XN NIP, ID = 3.725" ~4-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" I 9-5/8" CSG, 47#, N-80, ID = 8.681" PERFORATION SUMMARY REF LOG: BHCS ON 09/28/80 ANGLE AT TOP PERF: 32° @ 11283' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 11146 - 11168 S 03/26/81 3-1/8" 4 11178 - 11198 S 03/26/81 3-1/8" 4 11208 - 11238 S 05/02/81 3-1/8" 4 11248 - 11278 S 05/02/81 2-7/8" 6 11283-11293 O 02/22/09 3-1/2" 6 11293 - 11308 O 04/08/08 2-7/8" 6 11293 - 11308 O 09/02/07 3-3/8" 4 11293 - 11310 S 08/18/07 PBTD 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 2077' ~-~7" OTIS RPB SSSV LANDING NIP, ID=5.963" 9-5/8" DV PKR 10080' I-'iTOC (PKR SOZ 09/28/04) I )193'-10198' TBG PUNCH (09/21/04) 10203' TOP OF PBR 10226' 9-5/8" X 7" GUIB. POLAR PKR 10226' 7" X 4-1/2" XO, ID = 3.958" 10300' 4-1/2" X 2-7/8" NIP REDUCER, ID = 2.313" 10300' 2-7/8" PXN PLUG (05/20/09) 10333' 4-1/2" TUBING TAIL, ID = 3.958" 10340' ELMD TT LOGGED 10/06/91 11047' ~~ MARKER JOINT 11600' CTM ~ FISH - HES FASDRILL MILLED & PUSHED TO BOTTOM (10/07/04) 11646' FISH- 27' PERF GUN (03/26/81) 11669' TOP OF CEMENT (08/18/07) DATE REV BY COMMENTS DATE REV BY COMMENTS 09/80 ORIGINAL COMPLETION 08/18/07 MCZ/PJC CMTSOZ 07/18/01 RNITP CORRECTIONS 09/03/07 TEL/PJC PERFORATION 11/01/01 WB/TP SURFLOCCORRECTION 04/18/08 RMITLH RE-PERF 08/04/04 MDC/TLP IBP, FISH NECK 03/03/09 MV/SV ADPERF (02/22/09) 10/18/04 DBM/TLH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET NIP RED w /PXN PLUG (05/2 05/29/06 CO/DTM PERF CORRECTIONS (6/13/04) PRUDHOE BAY UNff WELL: J-13 PERMIT No: 1800830 API No: 50-029-20497-00 SEC 9, T11N, R13E BP Exploration (Alaska) TREE = 6" CAMERON WELLHEAD = FMC ACTUATOR = 6" OT1S KB.,ELEV = 69.07' BF. ELEV = 41.8T KOP= 2300' Max Angle = 61 @ 8600' Datum MD = 11105' Datum TVD = 8800' SS J-1i PRE-RIG 2077' ~~ 7" OTIS RPB SSSV LANDING NIP, ID=5.963" 2603' I~ 9-5/8" DV PKR 13-3/8" CSG, 72#, L-80, ID = 12.347" 11 2670, 9800' TBG CuT - Minimum ID = 2.313" @ 10300' 2-7/8" XN NIPPLE REDUCER 7" TBG, 26#, L-80, .0383 bpf, ID = 6.276" TOP OF 7" LNR I4-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" I 9-5/8" CSG, 47#, N-80, ID = 8.681" PERFORATION SUMMARY REF LOG: BHCS ON 09/28/80 ANGLE AT TOP PERF: 32° @ 11283' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-118" 4 11146 - 11168 S 03/26/81 3-1/8" 4 11178 - 11198 S 03/26/81 3-118" 4 11208 - 11238 S 05/02/81 3-1/8" 4 11248 - 11278 S 05/02/81 2-718" 6 11283 - 11293 O 02/22109 3-1/2" 6 11293 - 11308 O 04/08/08 2-7/8" 6 11293 - 11308 O 09/02/07 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10300' --~ 4-1 /2" OTIS XN NIP, ID = 3.725" 0080' -I TOC ~ 0080' TOC (PKR SOZ 09/28/04) 193'-10198' TBG PUNCH (09/21/04) 0203' TOP OF PBR i 10300' I-I4-1/2" X 2-7/8" NIP REDUCER, ID = 2.313" 10300' PULL 2-7/s° PXN PLUG 10333' 4-1/2" TUBING TAIL, ID = 3.958" 10340' ELMD TT LOGGED 10/06/91 10269' I-I 4-1 /2" OTIS X NIP, ID = 3.813" MA RKER JOINT 11600' CTM FISH - HES FASDRILL MILL® & ~ ~ PUSHED TO BOTTOM (10107/04) 11646' FISH- 27' PERF GUN (03/26!81) 11669' TOP OF CEMENT (08/18/07) DATE REV BY COMMENTS DATE REV BY COMMENTS 09/80 ORIGINAL COMPLETION 08/18/07 MCZ/PJC CMTSOZ 07/18/01 RN/TP CORRECTIONS 09/03/07 TEUPJC PERFORATION 11/01/01 WBlTP SURF LOC CORRECTION 04!18/08 RMITLH REP82F 08/04104 MDCIfLP IBP, FISH NECK 03/03/09 MV/SV ADP~2F (02/22/09) 10!16104 DBMITLH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET NIP RED w /PXN PLUG (05/2 05!29/06 CO/DTM PERF CORRECTIONS (6/13/04) PRUDHOE BAY UNff WE1L: J-13 PERMff No: 1800830 API No: 50-029-20497-00 SEC 9, T11 N, R13E BP Exploration (Alaska) 0226' I~ 7" X 4-1 /2" XO, ID = 3.958" 0226' I---I 9-5/8" X 7" GUIB. POLAR PKR TREE= 6 CAMERON Wf1LHEAD,= FMC _ ACTUATOR = .,.. 6" OTIS KB. aEV = 69.07' BF. ELEV = 41.87 KOP = 2300' Max Angle = 61 ~ 8600' Datum MD = 11105' Datum TVD = 8800' SS ~ J-13A S''~ ' Proposed Draft 2100' 4-112" X N~, ID = 3.813" 2503' 9-5/8" DV PKR 13-3/8" CSG, 72~, L-80, ~ =12.34T 2670' ST MD TVD DEV TYPE VLV LATCH 5 TBD TBD 4.5" x 1.5" 4 TBD TBD 4.5" x 1.5" 3 T8D TBD 4.5" x 1.5" 2 TBD TBD 4.5" x 1.5" 1 TBD TBD 4.5" x 1.5' ~. 9-5/8" CSG, 476, N-80 9800' -.~~ T TBG, 266, L-80 Cut T LNR, 296, L-80, .0371 bpf, ~ = 6.184° TOP OF T LNR 9450'-~ 10513' 10543' 10573' 10993' 10673' 1076 TOP OF 41/2" LNR 4-1 i2" OTIS X , ID = 3.813" 4-1/2" 41 /2" X T Packer 41 /2" OTIS X, ~ = 3.813" 4-1 /2" OTIS XN O = 3.725' 3~ T 29" I-80 BTC Liner 11541' 41/2" 12.6# 13Cr VamTop Liner PRUDHOE BAY UNfT WELL: J-13 PERMtT No: 1800830 API No: 50-029-20497-00 SEC 9, T11 N, R13E GATE REV BY CONN~(TS DATE REV BY COMMENTS 69/80 ORIGINAL COM PLETK)N 08/187 MCZ/P.K; CMT SOZ 07/18/01 RN/TP CORRECTIONS 09/03/07 T~/PJC P92FORATION 11m1/Ot WB/TP SURF LOC CORRECTION 04/18/08 RM/TLH RE-PH2F 08/04/04 MDC/TLP ~P, F1SH NECK 03103!09 MV/SV ADPERF (02P12~9) 10/16/44 DBMI7LH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET 1~ REDw/ PXN PLUG (0512 05/29/06 CO/DTM PERF CORRECTbNS (6/13/04) 11/18/09 DJ Proposed Sidetrack D/09) BP 6[pbration (Alaska) I~ STATE OF ALASKA ~~~~ ` ALAS~OIL AND GAS CONSERVATION COMMON ` REPORT OF SUNDRY WELL OPERATIONS ~,, 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Other Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Tit~Extensio ^ .r-; Change Approved Program ~ Operat. Shutdown ~ Perforate ~ ~ Re-enter Suspesr~ ell 2. Operator BP Exploration (Alaska), inc. 4. Current Well Class: 5. Permit to Dnl ~ber: ' > ~~ Name: Development ~ Exploratory A '~~~ ~ , 3. Address: P.O. Box 196612 Anchora e AK 99519-6612 Stratigraphic ~ Service ~ 6. API Number: /~~ ~U~~` S g , 50-029-20497-00-00- S7~ 7. KB Elevation (ft): 9. Well Name and Number: 69.1 KB - PBU J-13. 8. Property Designation: 10. Field/Pool(s): ADLO-028281 - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 11800 - feet Plugs (measured) None true vertical 9465 - feet Junk (measured) 11646 ~s;.~ Effective Depth measured 11749 feet ' ' ~ ~~~' ~~~r~ ~~t r' ~U~~~ true vertical 9419 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470 Production 10754 9-5/8" 47# N-80 26 - 10780 26 - 8607.7 6870 4760 Liner 1530 7" 29# L-80 10265 - 11795 8220 - 9461 8160 7020 Surface 2641 13-3/8" 72# L-80 29 - 2670 29 - 2653 4930 2670 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 10226 - 10333 7" 26# L-80 SURFACE - 10226 Packers and SSSV (type and measured depth) 9-5/8" DV Packer 2603 7" Guiberson Polar Packer 10226 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: si Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development ~' - Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas WAG GINJ ~ WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 2/24/2009 Form 10-404 Revi ed 04/2006 %~ .R '~, MQ~ ~ ~ ~7Q~ ~~( Submit Original Only ~~ J-13 180-083 PERF ATTACHMENT • • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd De th Base J-13 3/26181 PER 11,146. 11,168. 8,885.47 8,903.72 J-13 3/26181 PER 11,178. 11,198. 8,912.01 8,928.65 J-13 3/26/81 PER 11,208. 11,238. 8,936.99 8,962.09 J-13 3126181 PER 11,248. 11,278. 8,970.48 8,995.7 J-13 4/20/81 RPF 11,146. 11,168. 8,885.47 8,903.72 J-13 4/20/81 RPF 11,178. 11,198. 8,912.01 8,928.65 J-13 4120/81 RPF 11,208. 11,238. 8,936.99 8,962.09 J-13 4120181 RPF 11,248. 11,278. 8,970.48 8,995.7 J-13 512181 RPF 11,146. 11,168. 8,885.47 8,903.72 J-13 5/2/81 RPF 11,178. 11,198. 8,912.01 8,928.65 J-13 5/2/81 RPF 11,208. 11,238. 8,936.99 8,962.09 J-13 5/2/81 RPF 11,248. 11,278. 8,970.48 8,995.7 J-13 12/30/88 SQZ 11,146. 11,168. 8,885.47 8,903.72 J-13 12/30/88 SQZ 11,178. 11,198. 8,912.01 8,928.65 J-13 12/30/88 SQZ 11,208. 11,238. 8,936.99 8,962.09 J-13 12130188 SQZ 11,248. 11,278. 8,970.48 8,995.7 J-13 1116189 APF 11,293. 11,310. 9,008.36 9,022.76 J-13 8118/90 SQZ 11,146. 11,168. 8,885.47 8,903.72 J-13 8/18/90 SQZ 11,178. 11,198. 8,912.01 8,928.65 J-13 8/18/90 SQZ 11,208. 11,238. 8,936.99 8,962.09 J-13 8/18/90 SQZ 11,248. 11,278. 8,970.48 8,995.7 J-13 8/18/90 SQZ 11,293. 11,310. 9,008.36 9,022.76 J-13 8/23/90 RPF 11,293. 11,310. 9,008.36 9,022.76 J-13 8/17/07 SQZ 1. 11,310. 1. 9,022.76 J-13 9/2/07 RPF 11,293. 11,308. 9,008.36 9,021.06 J-13 4/8/08 RPF 11,293. 11,308. 9,008.36 9,021.06 J-13 2/22/09 APF 11,283. 11,293. 8,999.92 9,008.36 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ACTIVITYDATE SUMMARY 2/21/2009 ***ADPERF"** ( WELL SHUT IN ON ARRIVAL INITIAL T/I/O = 140/200/0 ; E 'PROGRAM CHANGED TO 2 7/8" PJ OMEGA HSD, 6 SPF, 60 DEG PHASING ***JOB CONTINUED ON 22-FEB-09*** J-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 2/22/2009' """CONTINUED FROM 21-FEB-2009""" ADPERF INITIAL T/I/O = 140/200/0 PERFORATED 11283'-11293' WITH 2 7/8" PJ OMEGA HSD, 6 SPF, 60 DEG PHASING. CHARGE DATA: PENE 36", EH 0.34", 16 GMS. CORRELATED TO SWS DIL LOG DATED 28 SEPT 1980. FINAL T/I/O = 100/200/0 "**JOB COMPLETE"** FLUIDS PUMPED BBLS 1 diesel 1 Total ~L ._ p ~ TR~4f Ill1/If 7~1'AL ;~---- --- ProActive Diagnostic Services, Inc. To: ALIGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hofe/Open Hole/Mechanical Logs and/or Tubing Inspection[Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska], Inc. Petrotechnical Data Center Attn: Joe I~astufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and i,~, ~~. ~ ~~, d~ i~ ~°'~~ .. kit tE% w~`i.aa'LU'~.)GL'Lo~. ~`Fa7.~~ s ~!, t.l3Eic1 ProActive Diagnostic Services, Inc. Attn: Robert A. Richey `~ ~-~~ 130 West International Airport Road 1 ~p-p~ 3 Suite C / ~S~/~o Anchorage, AK 99518 ~~~~,,~~, . ~, Fax: (907] 245.8952 1) Coil Flag 16-Nov-08 J-13 EDE 50-029-20497-00 2) Coil Flag 20-Nov-08 J-13 FEE F .~ ;, , ~b 7-00 ~z _ -~~~ . Signed . Date - ~~ ~~~ Print Name: v. PROACTNE DIAGNOSTIC SERVICES, k~IC., 130 W. INTERNATIONAL AIRPORT Im SUfrE C, ANCHORAGE, AK 98518 PHONE: (907)245-8951 Fax: (907)245-88952 E-MAIL: ~dsan~faorageCa?reaera,orvlaa.~®an WEBSiTE:I,v~dv~nr.rraorylc~~.~~~ C:1Documerts and Semngs\Ownec\DesktapllYansmit BP.docx • gyr data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 October 10, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: J-Pad, Well #J-13 Prudhoe Bay, Alaska • 0~3 \c~b Enclosed, please find two (2) copies, and one {1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, ~r~° ~" ~~` Rob oup North American Regional Manager RS:kI Serving the Worldwide Energy Industry with Precision Survey Instrumentation gy data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 SURVEY REPORT BP J-Pad #J-13 Wellhead Prudhoe Bay, AK AK0608G_133 20 Jun 2008 • Serving the Worldwide Energy Industry with Precision Survey Instrumentation ( Q o _ O ~~ A Gyrodata Directional Survey for B.P. EXPLORATION (ALASKA) INC Lease: J-PAD Well: J-13, Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 Run Date: 20 Jun 2008 Surveyor: Steve Thompson Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.326370 deg. N Longitude: 148.835630 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH .BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E ------------------------------------------------------------------------------------------------------------------------------------------------------------- 0 - 11577.28 FT. RATE CONTINUOUS MULTISHOT SURVEY ALL MEASURED DEPTHS ARE REFERENCED TO ORIGINAL R.K.B. OF 69.07 FT. AMSL AND A BASE FLANGE OF 41.87 FT. AMSL 100.00 0.48 241.27 S 61 16 W 0.12 100.00 0.4 241.3 0.20 S 0.37W 200.00 0.50 157.00 S 23 0 E 0.16 200.00 1.0 215.3 0.81 S O.S7W 300.00 0.61 193.78 S 13 47 W 0.09 299.99 1.8 197.0 1.72 S 0.53W 400.00 0.37 177.46 S 2 33 E 0.07 399.99 2.6 194.0 2.56 S 0.64W 500.00 0.89 165.51 S 14 29 E 0.13 499.98 3.7 186.8 3.64 S 0.43W 600.00 0.47 175.70 S 4 18 E 0.11 599.97 4.8 182.5 4.80 S 0.21 W 700.00 0.34 143.84 S 36 9 E 0.06 699.97 5.5 180.0 5.45 S O.OOW 800.00 O.S2 149.34 S 30 39 E 0.05 799.97 6.1 176.2 6.07 S 0.40 E 900.00 0.24 160.56 S 19 27 E 0.07 899.97 6.7 174.0 6.66 S 0.70 E 1000.00 0.48 114.49 S 65. 3.1 E .0.09 999.97 7.1 170.7 7.04 S 1.15 E 1100.00 0.36 353.05 N 6 S7 W 0.19 1099.96 7.1 167.7 6.90 S 1.50 E 1200.00 0.37 322.13 N 37 S2 W 0.05 1199.96 6.5 168.7 6.33 S 1.26 E 1300.00 0.41 26.97 N 26 S8 E 0.10 1299.96 S.9 168.0 5.75 S 1.22 E 1400.00 0.43 12.06 N 12 3 E 0.03 1399.96 5.3 163.9 -5.07 S 1.46 E 1500.00 0.39 345.78 N 14 13 W O.OS 1499.95 4.6 161.5 4.37 S 1.46 E 1600.00 0.09 134.60 S 45 24 E 0.12 1599.95 4.3 160.7 4.10 S 1.43 E 1700.00 0.38 289.08 N 70 SSW 0.12 1699.95 4.2 163.8 4.05 S 1.17 E • 2 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 1800.00 0.38 186.40 S 6 24 W 0.15 1799.95 4.3 169.1 4.27 S 0.82 E 1900.00 0.40 156.50 S 23 30 E 0.05 1899.95 5.0 169.3 4.92 S 0.93 E 2000.00 1.76 57.55 N 57 33 E 0.47 1999.93 5.0 151.9 4.42 S 2.36 E 2100.00 4.41 24.49 N 24 30 E 0.77 2099.79 5.3 91.0 0.10 S 5.25 E 2200.00 7.08 10.07 N 10 4 E 0.75 2199.28 12.4 39.9 9.48 N 7.92 E 2300.00 10.43 17.91 N 17 55 E 0.89 2298.10 26.9 26.0 24.17 N 11.79 E 2400.00 13.60 24.67 N 24 40 E 0.86 2395.91 47.6 24.1 43.47 N 19.48 E 2425.00 14.65 25.95 N 25 57 E 1.09 2420.15 53.7 24.3 48.98 N 22.09 E 2450.00 15.59 27.15 N 27 9 E 1.00 2444.28 60.2 24.5 54.81 N 25.01 E 2475.00 16.13 27.79 N 27 47 E 0.56 2468.33 67.1 24.8 60.88 N 28.16 E 2500.00 16.87 28.20 N 28 12 E 0.75 2492.30 74.2 25.1 67.14 N 31.49 E 2525.00 17.69 28.76 N 28 45 E 0.84 2516.17 81.6 25.4 73.67 N 35.03 E 2550.00 18.28 28.94 N 28 56 E 0.60 2539.95. 89.3 25.7 80.43 N 38.76 E 2575.00 19.25 29.06 N 29 4 E 0.97 2563...62 97.3 26.0 87.47 N 42.66 E 2600.00 20.58 29.53 N 29 32 E 1.34 '' 2587.13 '105.8 26.3 94.89 N 46.83 E 2625.00 21.49 29.68 N 29 41 E 0.91 2610.46 114.8 26.5 102.70 N 51.26 E 2650.00 22.14 29.74 N 29 44 E 0.64 2633.67 124.1 26.8 110.76 N 55.86 E 2675.00 22.47 29.75 N 29 45 E 0.34 2656.80 133.5 27.0 119.00 N 60.57 E 2700.00 22.67 29.79 N 29 47 E 0.20 2679.88 143.1 27.2 127.33 N 65.33 E 2725.00 22.95 30.03 N 30 2 E 0.30 2702.93 152.8 27.3 135.73 N 70.17 E 2750.00 23.26 30.63 N 30 38 E 0.39 2725.92 162.6 27.5 144.20 N 75.12 E 2775.00 23.77 31.07. N 31 4 E 0.54 2748.85 172.6 27.7 152.76 N 80.24 E • 3 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 2800.00 24.77 30.88 N 30 53 E 1.01 2771.64 182.8 27.9 161.57 N 85.53 E 2825.00 25.31 30.91 N 30 55 E 0.54 2794.29 193.4 28.1 170.65 N 90.96 E 2850.00 25.72 30.85 N 30 51 E 0.41 2816.85 204.1 28.2 179.89 N 96.49 E 2875.00 26.25 30.86 N 30 52 E 0.53 2839.32 215.1 28.3 189.30 N 102.10 E 2900.00 26.82 30.65 N 30 39 E 0.57 2861.69 226.2 28.5 198.90 N 107.82 E 2925.00 27.44 30.38 N 30 23 E 0.64 2883.94 237.6 28.6 208.72 N 113.60 E 2950.00 28.18 30.15 N 30 9 E 0.74 2906.05 249.3 28.6 218.79 N 119.48 E 2975.00 28.88 30.08 N 30 5 E 0.71 2928.02 261.2 28.7 229.12 N 125.47 E 3000.00 29.56 30.29 N 30 17 E 0.68 2949.84 273.4 28.8 239.67 N 131.61 E 3025.00 29.99 30.20 N 30 12 E 0.44 2971.53 285.8 28.8 250.39 N 137.86 E 3050.00 30.33 30.26 N 30 16 E 0.34 2993.15 298.4 28.9 261.25 N 144.19 E 3075.00 30.65 30.28 N 30 17 E 0.31 3014.69 311.1 29.0. 272.20 N 150.58 E 3100.00 30.89 30.41 N 30 24 E 0.25 3036.17 323.9 29.0 283.24 N 157.04 E 3125.00 31.10 30.52 N 30 31 E 0.21.... 3057.60 336.7 29..1 294.34 N 163.57 E 3150.00 31.41 30.52 N 30 31 E 0.31 307898 349.7 29.1 305.51 N 170.15 E 3175.00 31.71 30.46 N 30 28 E 0.30 3100.28 362.8 29.2 316.78 N .176.79 E 3200.00 32.03 30.34 N 30 20 E 0.33 3121.51 376.0 29.2 328.17 N 183.47 E 3225.00 32.45 30.13 N 30 8 E 0.43 3142.66 389.3 29.2 339.69 N 190.19 E 3250.00 32.76 30.15 N 30 9 E 0.31 3163.72 402.8 29.3 351.34 N 196.95 E 3275.00 33.18 30.01 N 30 1 E 0.43 3184.69 416.4 29.3 363.11 N 203.77 E 3300.00 33.60 30.01 N 30 1 E 0.42 3205.56 430.1 29.3 375.03 N 210.65 E • 4 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 3325.00 34.29 29.74 N 29 44 E 0.70 3226.30 444.1 29.3 387.13 N 217.60 E 3350.00 35.33 29.35 N 29 21 E 1.06 3246.83 458.4 29.3 399.55 N 224.64 E 3375.00 35.97 29.10 N 29 6 E 0.66 3267.14 472.9 29.3 412.26 N 231.75 E 3400.00 36.56 28.86 N 28 52 E 0.60 3287.30 487.7 29.3 425.20 N 238.92 E 3425.00 37.14 28.76 N 28 45 E 0.59 3307.31 502.7 29.3 438.34 N 246.14 E 3450.00 37.57 28.71 N 28 43 E 0.43 3327.18 517.9 29.3 451.64 N 253.44 E 3475.00 38.02 28.63 N 28 38 E 0.45 3346.93 533.2 29.3 465.08 N 260.79 E .3500.00 38.53 28.59 N 28 35 E 0.51 3366.56 548.7 29.3 478.67 N 268.20 E 3525.00 39.08 28.52 N 28 31 E 0.56 3386.04 564.4 29.2 492.44 N 275.69 E 3550.00 39.69 28.41 N 28 25 E 0.60 3405.36 580.2 29.2 506.38 N 283.25 E 3575.00 40.26 28.18 N 28 11 E O.S9 3424.52 596.3 29.2 520.52 N 290.87 E 3600.00 40.72 28.03 N 28 2 E 0.47 3443.54 612.5 29.2 534.84 N 298.51 E 3625.00 41.15 27.98 N 27 59 ' E 0.43 3462.42 628.9 29.1 549.30 N 306.20 E 3650.00 41.59 28.00 N 28 0 E 0.44 3481.18 645.4 29.1 563.89 N 313.96 E 3675.00 42.11 28.05 N 28 3 E 0.52 3499.80 662.1 ..29.1 578.62 N 321.80 E 3700.00 42.63 28.02 N 28 1 E 0.52 3518.27 678.9 29.1 593.49 N 329.72 E 3725.00 43.03 27.99 N 28 0 E 0.40 3536.61 695.9 29.0 608.50 N 337.70 E 3750.00 43.49 27.9T N 27 55 E 0.46 3554.81 713.1 29.0 623.63 N 345.73 E 3775.00 43.83 27.98 N 27 59 E 0.35 3572.90 730.3 29.0 638.88 N 353.82 E 3800.00 43.65 27.78 N 27 47 E 0.23 3590.96 747.6 29.0 654.16 N 361.90 E 3825.00 43.77 27.74 N 27 44 E 0.13 3609.03 764.9 28.9 669.44 N 369.95 E 3850.00 43.91 27.76 N 27 46 E 0.15 3627.06 782.2 28.9 684.77 N 378.01 E • • 5 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 3875.00 44.02 27.81 N 27 49 E 0.12 3645.06 799.5 28.9 700.12 N 386.10 E 3900.00 43.95 27.76 N 27 45 E 0.08 3663.04 816.9 28.9 715.48 N 394.19 E 3925.00 43.75 27.69 N 27 41 E 0.21 3681.07 834.2 28.8 730.81 N 402.25 E 3950.00 43.70 27.65 N 27 39 E 0.06 3699.14 851.5 28.8 746.12 N 410.27 E 3975.00 43.63 27.71 N 27 43 E 0.08 3717.23 868.7 28.8 761.40 N 418.29 E 4000.00 43.58 27.66 N 27 39 E 0.07 3735.33 886.0 28.8 776.67 N 426.30 E 4025.00 43.62 27.71 N 27 42 E 0.05 3753.44 903.2 28.7 791.94 N 434.31 E 4050.00 43.33 27.69 N 27 41 E 0.28 3771.58 920.4 28.7 807.17 N 442.30 E 4075.00 43.28 27.66 N 27 39 E 0.06 3789.77 937.6 28.7 822.35 N 450.27 E 4100.00 43.51 27.69 N 27 42 E 0.23 3807.93 954.7 28.7 837.56 N 458.25 E 4125.00 43.70 27.60 N 27 36 E 0.21 3826.04 972.0 28.7 852.84 N 466.25 E 4150.00 43.64 27.66 N 27 40 E 0.08 3844.12 989.2 28.6 868.13 N 474.25 E 4175.00 43.46 27.72 N 27 43 E 0.18 3862.24 1006.4 28.6 883.38 N 482.26 E 4200.00 43.29 27.73 N 27 44 E 0.17 3.880.41 1023.6 28.6. 898.58 N 490.25 E 4225.00 43.16 27.88 N 27 53 E O.1G 3898.63 1040.7 28.6 913.73 N 498.23 E 4250.00 42.88 28.14 N 28 8 E 0.33 3916.91 1057.8 28.6 928.78 N 506.24 E 4275.00 42.63 28.47 N 28 28 E 0.34 3935.26 1074.8 28.6 943.73 N 514.29 E 4300.00 42.57 28.55 N 28 33 E 0.08 3953.67 1091.7 28.6 958.60 N 522.36 E 4325.00 42.43 28.73 N 28 44 E 0.18 3972.10 1108.6 28.6 973.42 N 530.46 E 4350.00 42.49 28.74 N 28 44 E 0.06 3990.54 1125.4 28.6 988.22 N 538.57 E 4375.00 42.50 28.67 N 28 40 E 0.05 4008.98 1142.3 28.6 1003.03 N 546.68 E 4400.00 42.38 28.92 N 28 55 E 0.21 4027.42 1159.2 28.6 1017.82 N 554.81 E A Gyrodata Directional Survey • 6 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. .deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 4425.00 42.05 29.00 N 29 0 E 0.33 4045.94 1176.0 28.6 1032.51 N 562.94 E 4450.00 42.24 28.98 N 28 59 E 0.18 4064.48 1192.8 28.6 1047.19 N 571.07 E 4475.00 42.38 29.01 N 29 1 E 0.15 4082.97 1209.6 28.6 1061.90 N 579.23 E 4500.00 42.02 29.09 N 29 5 E 0.37 4101.49 1226.4 28.6 1076.58 N 587.39 E 4525.00 41.99 29.10 N 29 6 E 0.03 4120.06 1243.1 28.6 1091.20 N 595.52 E 4550.00 42.02 29.08 N 29 5 E 0.03 4138.64 1259.9 28.6 1105.82 N 603.66 E 4575.00 42.16 29.14 N 29 8 E 0.14 4157.19 1276.6 28.6 1120.46 N 611.81 E 4600.00 41.95 29.06 N 29 4 E 0.22 4175.76 1293.4 28.6 1135.09 N 619.95 E 4625.00 41.82 29,07 N 29 4 E 0.13 4194.37 1310.0 28.6 1149.68 N 628.06 E 4650.00 41.68 29.21 N 29 13 E 0.17 4213.02 1326.7 28.7 1164.22 N 636.16 E 4675.00 41.76 29.22 N 29 13 E 0.08 4231.68 1343.3 28.7 1178.74 N 644.29 E 4700.00 41.73 29.36 N 29 22 E 0.10 4250.33 1360.0 28.7 1193.26 N 652.43 E 4725.00 41.49 29.54 N 29 32 E 0.26 4269.03 1376.6 28.7 1207.72 N 660.59 E 4750.00 41.46 29.9.1 N 29 55 E 0.25 4287.76 1393.1 28.7 1222.10 N 668.80 E 4775.00 41.17 30:22 N 30 13 E 0.35 4306.53 1409.6 28.7 1236.38 N 677.07 E 4800.00 41.09 30.44 N 30 27 E 0.17 4325.36 1426.1 28.7 1250.58 N 685.38 E 4825.00 40.98 30.60 N 30 36 E 0.15 4344.22 1442.5 28.7 1264.71 N 693.71 E 4850.00 40.72 30.72 N 30 43 E 0.27 4363.13 1458.8 28.8 1278.78 N 702.05 E 4875.00 40.70 30.73 N 30 44 E 0.03 4382.08 1475.1 28.8 1292.80 N 710.38 E 4900.00 40.72 30.86 N 30 51 E 0.09 4401.03 1491.4 28.8 1306.80 N 718.73 E 4925.00 40.64 30.92 N 30 55 E 0.09 4419.99 1507.7 28.8 1320.79 N 727.09 E A Gyrodata Directional Survey • 7 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 4950.00 40.56 30.87 N 30 52 E 0.08 4438.97 1524.0 28.9 1334.75 N 735.45 E 4975.00 40.66 30.99 N 31 0 E 0.13 4457.95 1540.2 28.9 1348.71 N 743.81 E 5000.00 40.58 31.00 N 31 0 E 0.09 4476.93 1556.5 28.9 1362.66 N 752.19 E 5025.00 40.56 30.98 N 30 59 E 0.02 4495.92 1572.7 28.9 1376.60 N 760.56 E 5050.00 40.54 31.03 N 31 2 E 0.04 4514.92 1589.0 28.9 1390.53 N 768.94 E 5075.00 40.36 30.96 N 30 58 E 0.18 4533.94 1605.2 29.0 1404.43 N 777.29 E 5100.00 40.37 31.13 N 31 8 E 0.11 4552.99 1621.4 29.0 1418.30 N 785.64 E 5125.00 40.40 31.23 N 31 14 E 0.07 4572.03 1637.5 29.0 1432.16 N 794.03 E 5150.00 40.33 31.16 N 3I 9 E 0.09 4591.08 1653.7 29.0 1446.01 N 802.41 E 5175.00 40.25 31.22 N 31 13 E - 0.09 4610.15 1669.9 29.0 1459.84 N 810.78 E 5200.00 39.89 31.21 N 31 12 E 0.36. 4629.28 1686.0 29.1 1473.61 N 819.12 E 5225.00 40.03 31.27 N 31 16 E 0.1.4 4648.44 1702.0 29.1 1487.34 N 827.45 E 5250.00 40.07 3 L25 N 31 15 E 0.04 4667.58 1'718.1 29.1 1501.09 N 835.80 E 5275.00 39.95 31.19 N 31 11 E 0.1;3 4686.73 1734.1 29.1 1514.83 N 844.13 E 5300.00 39.58 31.26 N _31 16 E 0.37 4705.94 1.750.1 29.1. 1528.50 N 852.42 E 5325.00 39.51 31.32 N 31 19 E 0.08 4725.22 1766.0 29.2 1542.11 N 860.69 E 5350.00 39.37 31.38 N 31 23 E 0.15 4744.53 1781.9 29.2 1555.67 N 868.95 E 5375.00 39.37 31.58 N 31 35 E 0.13 4763.85 1797.8 29.2 1569.20 N .877.23 E 5400.00 39.20 31.90 N 31 54 E 0.26 4783.21 1813.6 29.2 1582.66 N 885.56 E 5425.00 39.33 32.07 N 32 4 E 0.18 4802.56 1829.4 29.3 1596.08 N 893.94 E 5450.00 39.47 32.05 N 32 3 E 0.13 4821.88 .1845.2 29.3 1609.53 N 902.36 E 5475.00 39.24 32.23 N 32 14 E 0.25 4841.21 1861.1 29.3 1622.95 N 910.79 E ~~ • 8 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 5500.00 39.14 32.23 N 32 14 E 0.10 4860.59 1876.8 29.3 1636.31 N 919.22 E 5525.00 39.24 32.47 N 32 28 E 0.18 4879.96 1892.6 29.4 1649.66 N 927.67 E 5550.00 39.13 32.47 N 32 28 E 0.11 4899.34 1908.4 29.4 1662.98 N 936.15 E 5575.00 38.96 32.81 N 32 48 E 0.27 4918.76 1924.1 29.4 1676.25 N 944.65 E 5600.00 38.82 33.22 N 33 13 E 0.29 4938.21 1939.8 29.4 1689.41 N 953.20 E 5625.00 38.81 33.79 N 33 47 E 0.36 4957.69 1955.4 29.5 1702.48 N 961.85 E 5650.00 38.93 34.14 N 34 9 E 0.26 4977.16 1971.0 29.5 1715.49 N 970.61 E 5675.00 38.93 34.14 N 34 9 E 0.00 4996.61 1986.7 29.5 1728.49 N 979.43 E 5700.00 38.93 34.15 N 34 9 E 0.01 5016.05 2002.4 29.6 1741.49 N 988.25 E 5725.00 38.94 34.21 N 34 13 E 0.04 5035.50 2018.0 29.6 1754.49 N 997.07 E 5750.00 39.14 34.22 N 34 13 E 0.20. 5054.92 2033.7 29.6 1767.51 N 1005.93 E 5775.00 39.37 34.26 N 34 16 E 0.24 5074.28 2049.5 29.7 1780.59 N 1014.83 E 5800.00 39.45 34.19 N 34 12 E 0.09 5093.59 2065.3 29.7 1793.71 N 1023.76 E 5825.00 39.29 34.26 N 34 15 E 0.17 5112.92 2081..1.. 29.7. 1806.82 N 1032.68 E 5850.00 39.48 34.30 N 34 I8 E 0.19 5132.24 2096.9 29.8 1819.93 N 1041.61 E .5875.00 39.66 34.37 N 34 22 E 0.19 5151.51 2112.8 29.8 1833.08 N 1050.59 E 5900.00 39.74 34.35 N 34 21 E 0.07 5170.75 2128.7 29.9 1846.26 N 1059.61 E 5925.00 39.74 34.29 N 34 18 E 0.04 5189.97 2144.7 29.9 1859.46 N 1068.62 E 5950.00 39.71 34.29 N 34 18 E 0.03 5209.20 2160.6 29.9 1872.66 N 1077.62 E 5975.00 39.54 34.19 N 34 11 E 0.18 5228.45 2176.5 29.9 1885.84 N 1086.59 E 6000.00 39.67 34.17 N 34 10 E 0.13 5247.71 2192.4 30.0 1899.03 N 1095.55 E 6025.00 39.79 34.10 N 34 6 E 0.12 5266.94 2208.3 30.0 1912.26 N 1104.51 E r1 U n 9 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 6050.00 39.63 34.17 N 34 10 E 0.16 5286.17 2224.3 30.0 1925.48 N 1113.47 E 6075.00 39.63 34,10 N 34 6 E 0.05 5305.43 2240.2 30.1 1938.68 N 1122.42 E 6100.00 39.77 34.03 N 34 2 E 0.15 5324.66 2256.1 30.1 1951.90 N 1131.37 E 6125.00 39.80 33.95 N 33 57 E 0.07 5343.87 2272.0 30.1 1965.17 N 1140.31 E 6150.00 39.84 33.96 N 33 58 E 0.04 5363.07 2288.0 30.2 1978.45 N 1149.25 E 6175.00 39.89 33.88 N 33 53 E 0.07 5382.26 2304.0 30.2 1991.75 N 1158.20 E 6200.00 39.91 33.84 N 33 50 E 0.03 5401.44 2320.0 30.2 2005.06 N 1167.13 E 6225.00 40.09 33.73 N 33 44 E 0.19 5420.59 2336.1 30.2 2018.42 N 1176.07 E 6250.00 40.02 .33.73 N 33 44 E 0.07 5439.73 2352.1 ;30.3 2031.80 N 1185.00 E 6275.00 40.13 33.80 N 33 48 E 0.12 5458.86 2368.2 30.3 2045.18 N 1193.95 E 6300.00 39.86 33.72 N 33 43 E 0.27 5478.01 2384.2 30.3 2058.54 N 1202.88 E 6325.00 39.72 33.71 N 33 42 E 0.14 5497.22 2400.2 3'0.3 2071.85 N 1211.76 E 6350.00 39.93 33.66 N 33 40 E 0.21 5516.42 2416.2 30.3 2085.17 N 1220.64 E 6375.00 40.45. .33.70 N 33 42 E 0.52 5535.52 2432.3 30.4 2098.60 N 1229.58 E 6400.00 40.71 33.55 N 33 33 E 0.28 5554.50 2448.5 30.4 2112.14 N 1238.59 E 6425.00 40.96 33.37 N 33 22 E 0.27 5573.42 2464.8 30.4 2125.78 N 1247.60 E 6450.00 41.06 33.41 N 33 25 E 0.11 5592.28 2481.2 30.4 2139.47 N 1256.63 E 6475.00 40.89 33.41 N 33 25 E 0.17 5611.16 2497.6 30.4 2153.16 N 1265.66 E 6500.00 40.93 33.35 N 33 21 E 0.06 5630.05 2513.9 30.5 2166.83 N 1274.66 E 6525.00 41.11 33.35 N 33 21 E 0.18 5648.91 2530.3 30.5 2180.54 N 1283.68 E 6550.00 41.31 33.35 N 33 21 E 0.20 5667.72 2546.8 30.5 2194.30 N 1292.74 E • • 10 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 6575.00 41.33 33.35 N 33 21 E 0.02 5686.50 2563.3 30.5 2208.08 N 1301.81 E 6600.00 41.24 33.48 N 33 29 E 0.12 5705.28 2579.7 30.5 2221.85 N 1310.90 E 6625.00 41.47 33.49 N 33 30 E 0.22 5724.05 2596.2 30.6 2235.63 N 1320.01 E 6650.00 41.45 33.55 N 33 33 E 0.04 5742.78 2612.8 30.6 2249.43 N 1329.15 E 6675.00 41.48 33.41 N 33 25 E 0.10 5761.52 2629.3 30.6 2263.23 N 1338.29 E 6700.00 41.42 33.44 N 33 26 E 0.07 5780.26 2645.8 30.6 2277.04 N 1347.40 E 6725.00 41.70 33.53 N 33 32 E 0.29 5798.96 2662.4 30.6 2290.88 N 1356.55 E 6750.00 41.95 33.41 N 33 25 E 0.26 5817.59 2679.0 30.6 2304.78 N 1365.75 E 6775.00 41.70 33.49 N 33 30 E 0.25 5836.22 2695.7 30.7 2318.69 N 1374.94 E 6800.00 41.50 33.56 N 33 33 E 0.20 5854.92 2712.3 30.7 2332.53 N 1384.10 E 6825.00 41.67 33.46 N 33 27 E 0.18 5873.62 2728.8 30.7 2346.36 N 1393.26 E 6850.00 41.89 33.55 N 33 33 E 0.23 5892.26 2745.5 30.7 2360.25 N 1402.46 E 6875.00 41.83 33.50 N 33 30 E 0.08 5910.88 2762.1 30.7 2374.16 N 1411.67 E 6900.00 41.70 33.61 N 33 37 E 0.15 5929.53 2778.8 30.8 2388.04 N 1420.88 E 6925.00 41.43 33.66. N 33 40 E 0..27 .5948.23 2795.3. 30.8 2401.85 N 1430.07 E 6950.00 41.46 33.70 N 33 42 E 0.03 5966.97 2811.9 30.8 2415.62 N 1439.24 E 6975.00 41.50 33.73 N 33 44 E 0.05 5985.70 2828.4 30.8 2429.39 N 1448.43 E 7000.00 41.32 33.68 N 33 41 E 0.19 6004.45 2844.9 30.8 2443.15 N 1457.61 E 7025.00 41.33 33.66 N 33 39 E 0.02 6023.23 2861.4 30.8 2456.89 N 1466.76 E 7050.00 41.25 33.73 N 33 44 E 0.09 6042.01 2877.9 30.9 2470.61 N 1475.91 E 7075.00 41.33 33.75 N 33 45 E 0.08 6060.79 2894.4 30.9 2484.33 N 1485.07 E 7100.00 41.31 33.79 N 33 48 E 0.04 6079.57 2910.9 30.9 2498.06 N 1494.25 E • 11 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 7125.00 41.12 33.79 N 33 47 E 0.19 6098.38 2927.3 30.9 2511.74 N 1503.41 E 7150.00 40.93 33.72 N 33 43 E 0.19 6117.24 2943.7 30.9 2525.39 N 1512.53 E 7175.00 41.08 33.78 N 33 47 E 0.15 6136.10 2960.1 30.9 2539.03 N 1521.64 E 7200.00 41.02 33.76 N 33 46 E 0.06 6154.96 2976.5 30.9 2552.67 N 1530.77 E 7225.00 41.06 33.82 N 33 49 E 0.06 6173.81 2992.9 31.0 2566.31 N 1539.90 E 7250.00 41.02 33.79 N 33 48 E 0.05 6192.67 3009.3 31.0 2579.96 N 1549.03 E 7275.00 40.90 33.81 N 33 49 E 0.12 6211.55 3025.6 31.0 2593.57 N 1558.15 E 7300.00 41.01 33.90 N 33 54 E 0.12 6230.43 3042.0 31.0 2607.18 N 1567.28 E 7325.00 41.03 33.85 N 33 51 E 0.04 6249.29 3058.4 31.0 2620.80 N 1576.42 E 7350.00 40.90 33.82 N 33 49 E 0.13 6268.17 3074.8 31.0 2634.42 N 1585.55 E 7375.00 41.12 33.82 N 33 49 E 0.22 6287.03 3091.1 31.1 2648.05 N 1594.68 E 7400.00 41.34 33.63 N 33 38 E 0.25 6305.84 3107.6 31.1 2661.75 N 1603.83 E 7425.00 41.39 33.38 N 33 23 E 0.17 6324.60 3124.1 31.1 2675.53 N 1612.94 E 7450.00 41.67 33.40. N 33 24 E 0.28. 6343.31. 3140.7. 31.1 2689.37 N 1622.07 E 7475.00 41.91 33.26 N 33 16 E 0.26 6361.95 3157.3 31.1 2703.29 N 1631.22 E 7500.00 42.04 33.15 N 33 9 E 0.15 6380.54 3174.0 31.1 2717.28 N 1640.38 E 7525.00 42.31 33.18 N 33 11 E 0.27 6399.07 3190.8 31.1 2731.33 N 1649.56 E 7550.00 42.27 33.12 N 33 7 E 0.06 6417.56 3207.6 31.1 2745.41 N .1658.76 E 7575.00 42.55 33.21 N 33 13 E 0.29 6436.02 3224.5 31.2 2759.52 N 1667.98 E 7600.00 42.86 33.10 N 33 6 E 0.32 6454.39 3241.4 31.2 2773.72 N 1677.25 E 7625.00 42.91 33.02 N 33 1 E 0.07 6472.71 3258.4 31.2 2787.97 N 1686.53 E 7650.00 43.01 33.07 N 33 4 E 0.10 6491.01 3275.4 31.2 2802.25 N 1695.82 E A Gyrodata Directional Survey • • 12 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7675.00 43.40 33.08 N 33 5 E 0.39 6509.23 3292.5 31.2 2816.60 N 1705.16 E 7700.00 43.40 33.03 N 33 2 E 0.04 6527.40 3309.7 31.2 2830.99 N 1714.53 E 7725.00 43.59 33.02 N 33 1 E 0.19 6545.53 3326.9 31.2 2845.42 N 1723.91 E 7750.00 43.74 33.08 N 33 5 E 0.16 6563.62 3344.2 31.2 2859.89 N 1733.33 E 7775.00 43.83 33.08 N 33 5 E 0.08 6581.66 3361.4 31.2 2874.38 N 1742.77 E 7800.00 44.02 33.07 N 33 4 E 0.19 6599.67 3378.8 31.2 2888.92 N 1752.23 E 7825.00 44.01 33.14 N 33 8 E 0.05 6617.65 3396.1 31.2 2903.47 N 1761.72 E 7850.00 43.95 33.24 N 33 15 E 0.10 6635.64 3413.5 31.3 2917.99 N 1771.22 E 7875.00 44.08 33.47.. N 33 28 E 0.21 6653.62 :3430.9 31.3 2932.50 N 1780.78 E 7900.00 44.03 33.60 N 33 36 E 0.10 6671.59 3448.2 313 2946.99 N 1790.38 E 7925.00 43.92 33.92 N 33 55 E 0.25. 6689.58 3465.6 31.3 2961.42 N 1800.03 E 7950.00 44.06 34.09 N 34 5 E 0.18 6707.57 3482.9 31.3 2975.82 N 1809.74 E 7975.00 44.05 34.37 N 34 22 E 0.1`9 6725.53 3500.3 31.3 2990.19 N 1819.51 E 8000.00 44.17 34.51 N 34 30 E 0.16 6743.48 3517.6 31.3 3004.54 N 1829.36 E 8025.00 44.50 34.64 N 34 38 E 033 6761.36 3535.1 31.4 3018.93 N 1839.27 E 8050.00 44.85 34.69 N 34 42 E 0.35 6779.14 3552.6 31.4 3033.39 N 1849.27 E 8075.00 45.31 34.74 N 34 44 E 0.46 6796.80 3570.3 31.4 3047.94 N 1859.35 E 8100.00 45.95 34.80 N 34 48 E 0.64 6814.28 3588.1 31.4 3062.61 N 1869.54 E 8125.00 46.48 34.96 N 34 57 E 0.54 6831.58 3606.2 31.4 3077.42 N 1879.86 E 8150.00 47.48 35.01 N 35 0 E 1.00 6848.64 3624.4 31.4 3092.39 N 1890.34 E 8175.00 48.41 35.09 N 35 5 E 0.94 6865.38 3642.9 31.5 3107.59 N 1901.00 E • • 13 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 8200.00 49.20 35.09 N 35 5 E 0.79 6881.85 3661.7 31.5 3122.98 N 1911.81 E 8225.00 50.18 35.08 N 35 5 E 0.99 6898.02 3680.7 31.5 3138.58 N 1922.77 E 8250.00 50.94 35.03 N 35 2 E 0.76 6913.90 3700.0 31.5 3154.39 N 1933.86 E 8275.00 51.67 35.12 N 35 7 E 0.73 6929.53 3719.5 31.5 3170.36 N 1945.07 E 8300.00 52.44 35.15 N 35 9 E 0.78 6944.90 3739.1 31.5 3186.48 N 1956.42 E 8325.00 53.08 35.22 N 35 13 E 0.64 6960.03 3759.0 31.6 3202.75 N 1967.89 E 8350.00 53.73 35.18 N 35 11 E 0.65 6974.93 3779.0 31.6 3219.15 N 1979.46 E 8375.00 54.58 35.26 N 35 16 E 0.85 6989.57 3799.3 31.6 3235.70 N 1991.14 E 8400.00 55.26 35.23 N 35 14 E 0.68 7003.94 3819.7 31.6 3252.41 N 2002.95 E 8425.00 56.06 35.23- N 35 14 E 0.80 7018.04 3840.3 31.6 3269.27 N 2014.86 E 8450.00 57.04 35.16 N 35 9 E 0.98 7031.82 3861.1 31.7 3286.32 N 2026.88 E 8475.00 57.88 35.24 N 35 15 E 0.84 7045.27. 3882.1 31.7 3303.54 N 2039.03 E 8500.00 58.53 35.33 N 35 20 E 0.65 7058.44' 3903.3 31.7. 3320.89 N 2051.31 E 8525.00 59.37 35.18 N 35 11 E 0.85 7071.33 3924.7 31.7 3338.38 N 2063.67 E 8550.00 59.87 35.26 _N 35 16 E 0.51 7083.98 3946.3 31.7. 3355.99N 2076.11 E 8575.00 60.55 35.35 N 35 21 E 0.68 7096.40 3967.9 31.8 3373.70 N 2088.65 E 8600.00 61.05 35.24 N 35 15 E 0.50 7108.59 3989.7 31.8 3391.51 N 2101.26 E 8625.00 60.98 35.09 N 35 5 E 0.15 7120.71 4011.5 31.8 3409.39 N 2113.85 E 8650.00 60.90 35.05 N 35 3 E 0.09 7132.85 4033.3 31.8 3427.27 N 2126.41 E 8675.00 60.75 35.11 N 35 7 E 0.15 7145.04 4055.1 31.8 3445.14 N 2138.95 E 8700.00 60.49 35.11 N 35 6 E 0.27 7157.30 4076.9 31.9 3462.96 N 2151.48 E 8725.00 60.43 35.00 N 35 0 E 0.11 7169.63 4098.6 31.9 3480.76 N 2163.97 E • ., 14 B.P. Exploration (Alaska) Inc Lease: J-PAD We11: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 8750.00 60.14 34.97 N 34 58 E 0.29 7182.03 4120.3 31.9 3498.55 N 2176 42 E 8775.00 59.87 35.01 N 35 1 E 0.27 7194.53 4141.9 31.9 3516.29 N . 2188.84 E 8800.00 59.77 35.06 N 35 3 E 0.10 7207.09 4163.5 31.9 3533.98 N 2201.25 E 8825.00 59.66 35.14 N 35 8 E 0.13 7219.70 4185.0 31.9 3551.64 N 2213 66 E 8850.00 59.41 35.12 N 35 7 E 0.25 7232.37 4206.5 32.0 3569.27 N . 2226.06 E 8875.00 59.36 35.05 N 35 3 E 0.08 7245.10 4228.0 32.0 3586.88 N 2238.42 E 8900.00 58.98 34.96 N 34 57 E 0.39 7257.92 4249.5 32.0 3604.46 N 2250 74 E 8925.00 58.06 35.19 N 35 11 E 0.94 7270.97 4270.8 32.0 3621.91 N . 2262.99 E 8950.00 56.63 35.43 N 35 26 E 1,44 7284.46 4291.8 32.0 3639.08 N 2275.16 E 8975.00 55.37 35.56 N 35 34 E 1.27 7298.44 4312.5 32.0 3655.96 N 2287.19 E 9000.00 54.23 35.33 N 35 20 E 1.15' 7312.85 4332.8 32.0 3672.60 N 2299.04 E 9025.00 53.29 35.05 N 35 3 E 0.97 7327.63 4353.0 32.1 3689.08 N 2310.66 E 9050.00 52.45 35.26 N 35 16 E 0.85 7342.72 4372.9 32.1 3705.37 N 2322.14 E 9075.00 51.06 35.57 N 35 34 E 1.42. 73.58.20 4392.5 32.1 3721.38 N 2333.51 E 9100.00 49.50 35.75 N 35" 45 E 1.56 7374.17 4411.7 32.1 3737.00N 2344.72 E 9125.00 48.14 35.96 N 35 58 E 1.37 7390.63 4430.5 32.1 3752.25 N 2355.74 E 9150.00 47.44 36.27 N 36 16 E 0.74 7407.43 4448.9 32.1 3767.21 N 2366.66 E 9175.00 47.09 36.18 N 36 11 E 0.35 7424.39 4467.2 32.2 3782.02 N 2377.51 E 9200.00 46.79 35.88 N 35 53 E 0.38 7441.46 4485.5 32.2 3796.79 N 2388.26 E 9225.00 46.83 35.92 N 35 55 E 0.05 7458.57 4503.7 32.2 3811.55 N 2398.94 E 9250.00 46.85 35.86 N 35 52 E 0.05 7475.67 4521.8 32.2 3826.33 N 2409.63 E 9275.00 46.93 35.84 N 35 50 E 0.08 7492.76 4540.1 32.2 3841.12 N 2420.32 E A Gyrodata Directional Survey • L~ 15 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9300.00 46.93 35.67 N 35 40 E 0.12 7509.83. 4558.3 32.2 3855.94 N 2430.99 E 9325.00 46.88 35.68 N 35 41 E 0.06 7526.91 4576.5 32.2 3870.77 N 2441 64 E 9350.00 46.70 35.84 N 35 50 E 0.21 7544.03 4594.7 32.3 3885.56 N . 2452 29 E .9375.00 46.77 35.76 N 35 45 E 0.09 7561.16 4612.9 32.3 3900.32 N . 2462 94 E 9400.00 46.49 35.85 N 35 51 E 0.29 7578.33 4631.0 32.3 3915.06 N . 2473 57 E 9425.00 46.23 35.68 N 35 41 E 0.29 7595.58 4649.1 32.3 3929.74 N . 2484.14 E 9450.00 46.21 35.74 N 35 44 E 0.04 7612.88 4667.1 32.3 3944.40 N 2494 68 E 9475.00 46.08 35.58 N 35 35 E 0.17 7630.20 4685.1 32.3 3959.05 N . 2505 18 E 95.00.00 46.11 35.38 N 35 23 E 0.15 7647.54 4703.1 32.3 3973.72 N . 2515 64 E 9525.00 46.21 35.28 N 35 T7 E 0.12 7664.86 4721.1 32.3 3988.43 N . 2526 07 E 9550.00 46.01 35.35 N 35 21 E 0.20 7682.19 4739.1 32.4. 4003.13 N . 2536.48 E 9575.00 46.11 35.34 N 35 20 E 0.10 7699.53 4757.0 32.4 4017.81 N 2546 90 E 9600.00 45.86 35.11 N 35 7 E 0.30 7716.90 4775.0 32.4 4032.50 N . 2557 27 E 9625.00 45.33 34.84 N 34 50 E 0.57 7734.40 4792.8 32.4 4047.13 N . 2567 51 E 9650.00 44.34 - 34.90 N 34 54 E 0.99 7752.12 4810.5 32.4 4061.60 N . 2577 58 E 9675.00 43.42 35.05 N 35 3 E 0.93 7770.14 4827.8 32.4 4075.80 N . 2587.52 E 9700.00 42.87 35.13 N 35 8 E 0.56 7788.38 4844.8 32.4 4089.79 N 2597 35 E 9725.00 42.85 34.69 N 34 42 E 0.29 7806.71 4861.8 32.4 4103.73 N . 2607 08 E 9750.00 42.66 34.92 N 34 55 E 0.24 7825.07 4878.8 32.4 4117.67 N . 2616 77 E 9775.00 42.67 35.05 N 35 3 E 0.09 7843.45 4895.7 32.4 4131.55 N . 2626 48 E 9800.00 42.64 34.63 N 34 38 E 0.28 7861.84 4912.6 32.5 4145.45 N . 2636.16 E • 16 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH BEARING feet deg. deg. deg. min. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. • 9825.00 42.62 34.44 9850.00 42.67 34.11 9875.00 42.57 34.16 9900.00 42.46 34.15 9925.00 42.53 34.22 9950.00 42.56 34.28 9975.00 42.34 34.38 10000.00 42.55 34.26 10025.00 42.46 34.54 10050.00 42.31 34.78 10075.00 42.48 34.99 10100.00 42.42 34.95 10125.00 42.39 34.93 10150.00 42.40 35.44 10175.00 42.45 3 5.31 10200.00 42.55 35.01 10225.00 42.37 35.38 10250.00 42.53 35.26 10275.00 42.09 35.14 10300.00 42.11 35.48 10325.00 42.14 35.51 10350.00 42.05 35.50 N 34 26 E 0.13 7880.23 4929.6 32.5 4159.40 N 2645.75 E N 34 6 E 0.23 7898.62 4946.5 32.5 4173.39 N 2655.29 E N 34 10 E 0.10 7917.02 4963.4 32.5 4187.41 N 2664.79 E N 34 9 E 0.11 7935.44 4980.3 32.5 4201.39 N 2674.28 E N 34 13 E 0.08 7953.88 4997.2 32.5 4215.36 N 2683.77 E N 34 17 E 0.05 7972.29 5014.1 32.5 4229.33 N 2693.28 E N 34 23 E 0.23 7990.74 5030.9 32.5 4243.26 N 2702.80 E N 34 16 E 0.22 8009.19 5047.8 32.5 4257.20 N 2712.31 E N 34 33 E 0.21 8027:62 5064.7 32.5 4271.14 N 2721.85 E N 34 47 E 0.22 - 8046.08 5081.5 32.5. 4285.00 N 2731.44 E N 34 59 E 0.21 8064.55 5098.4 32.5 4298.83 N 2741.08 E N 34 57 E 0.06 8082.99. 5115.2 32.5 4312.65 N 2750.75 E N 34 56 E 0.04 $101.45 5132.1 32.5 4326.47 N 2760.40 E N 35 26 E 0.34 8119.92 5148.9 32.5 4340.25 N 2770.12 E N 35 19 E 0.10 8138.37 5165.8 32.6 43.54.00 N 2779.88 E N 35 0 E 0.23 8156.80 5182.6 32.6 4367.81 N 2789:61 E N 35 23 E 0.31 8175.24 5199.5 32.6 4381.60 N 2799.33 E N 35 15 E 0.18 8193.69 5216.3 32.6 4395.37 N 2809.09 E N 35 8 E 0.45 8212.18 5233.2 32.6 4409.12 N 2818.79 E N 35 29 E 0.23 8230.73 5249.9 32.6 4422.80 N 2828.48 E N 35 31 E 0.04 8249.27 5266.6 32.6 4436.45 N 2838.21 E N 35 30 E 0.09 8267.83 5283.4 32.6 4450.09 N 2847.95 E • 17 B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DEPTH ~ BEARING feet deg. deg. deg. min. DOGLEG .VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 25 ft. 10375.00 42.02 35.66 N 35 39 E 0.11 8286.39 5300.1 32.6 4463.71 N 2857.68 E 10400.00 41.91 35.79 N 35 47 E 0.14 8304.98 5316.8 32.6 4477.28 N 2867.45 E 10425.00 41.63 35.84 N 35 50 E 0.28 8323.63 5333.4 32.6 4490.78 N 2877.19 E 10450.00 41.70 35.96 N 35 57 E 0.11 8342.30 5350.0 32.7 4504.25 N 2886.94 E 10475.00 41.70 35.88 N 35 53 E 0.05 8360.97 5366.6 32.7 4517.72 N 2896.69 E 10500.00 41.51 35.87 N 35 52 E 0.19 8379.66 5383.2 32.7 4531.17 N 2906.42 E 10525.00 41.48 36.26 N 36 16 E 0.26 8398.38 5399.7 32.7 4544.56 N 2916.17 E 10550.00 41.40 36.54 N 36 32 E 0.20 8417.12 5416.2 32.7 4557.88 N 2925.99 E 10575.00 41.25 36.72 N 36 43 E 0.19 8435.90 5432.7 32.7 4571.12 N 2935.84 E 10600.00 41.26 36.97 N 36 58 E 0.17 8454.69 5449.2 32.7 4584.32 N 2945.73 E 10625.00 41.13 37.04 N 37 3 E 0.14 8473.51 5465.6 32 7 4597 47 N 2955 64 E 10650.00 41.05 36.97 N 36 58 E 0.09 8492.35 5482.0 . 32.7 . 4610.59 N . 2965.53 E 10675.00 40.68 37.06 N 37 3 E ` 0.38 8511.25 5498.3 32.8 4623.65 N 2975.37 E 10700.00 40.36 37.24. N 37 14 E 0.34. 8530.26. 5514.5 32.8 4636.60 N 2985.18 E 10725.00 40.11 37.44 N 37 26 E 0.28 854934 5530.6 32.8 4649.44 N 2994.98 E 10750.00 39.75 37.49 N 37 29 E 0.36 8568.51 5546.6 32.8 4662.18 N 3004.74 E 10775.00 39.68 37.43 N 37 26 E 0.08 8587.74 5562.5 32.8 4674.86 N 3014.45 E 10800.00. 39.65 37.96 N 37 57 E 0.33 8606.99 5578.4 32.8 4687.48 N 3024.21 E 10825.00 39.11 39.05 N 39 3 E 0.88 8626.31 5594.2 32.8 4699.90 N 3034.08 E 10850.00 38.33 40.48 N 40 29 E 1.19 8645.81 5609.7 32.9 4711.92 N 3044.09 E 10875.00 37.55 41.77 N 41 46 E 1.1 l 8665.53 5624.9 32.9 4723.49 N 3054.19 E 10900.00 37.25 42.19 N 42 11 E 0.39 8685.39 5639.9 32.9 4734.78 N 3064.35 E A Gyrodata Directional Survey r~ 18 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 10925.00 36.95 41.91 N 41 55 E 0.34 8705.33 5654.8 32.9 4745.98 N 3074.45 E 10950.00 36.74 41.65 N 41 39 E 0.26 8725.34 5669.6 33.0 4757.16 N 3084 44 E 10975.00 36.23 41.60 N 41 36 E 0.51 8745.44 5684.3 33.0 4768.27 N . 3094 31 E 11000.00 35.82 41.53 N 41 32 E 0.41 8765.66 5698.8 33.0 4779.27 N . 3104 07 E 11025.00 35.43 41.42 N 41 25 E 0.39 8785.98 5713.2 33.0 4790.18 N . 3113 71 E 11050.00 34.99 41.37 N 41 22 E 0.44 8806.40 5727.5 33.0 4800.99 N . 3123.25 E 11075.00 34.79 41.35 N 41 21 E 0.20 8826.91 5741.6 33.1 4811.73 N 3132 70 E 11100.00 34.46 41.23 N 41 14 E 0.34 8847.48 5755.7 - 33.1 4822.40 N . 3142 07 E 11125.00 34.40 .41.21 N 41 13 E 0:.06 8868.10 .5769:7 33.1 4833.03 N . 3151 38 E 11150.00 34.01 41.13 N 41 8 E 0.39 8888.78 5783.6 33.1 4843.61 N . 3160 63 E 11175.00 33.91 40.97 N 40 58 E 0.14 8909.52 5797.4 33.1 4854.14 N . 3169.81 E 11200.00 33.55 41.01 N 41 l E 0.36 8930.31 5811.2 33.2 4864.62 N 3178 91 E 11225.00 33.17 40.78 N 40 47 E 0.40 8951.19 5824.8 33.2 4875.01 N . 3187 91 E 11250.00 32.94 40.63 N 40 38 E 0.24 8972.14. 5838.3 33.2 4885.35 N . 3196 80 E 11275.00 32.59 40.29 N 40 17 E 0.40 8993.17 5851.8 33.2 4895.64 N . 3205 58 E 11300.00 32.17 40.21 N 40 12 E 0.42 9014.28 5865.0 33.2 4905.86 N . 3214.23 E 11325.00 31.91 40.05 N 40 3 E 0.28 9035.47 5878.2 33.2 4916.00 N 3222 78 E 11350.00 31.49 39.93 N 39 56 E 0.42 9056.74 5891.3 33.3 4926.07 N . 3231 23 E 11375.00 31.39 39.57 N 39 34 E 0.22 9078.07 5904.2 33.3 4936.09 N . 3239.56 E 11400.00 31.07 39.49 N 39 29 E 0.33 9099.45 5917.1 33.3 4946.09 N 3247 81 E 11425.00 30.85 39.35 N 39 21 E 0.23 9120.88 5929.9 33.3 4956.03 N . 3255.98 E 19 A Gyrodata Directional Survey B.P. Exploration (Alaska) Inc Lease: J-PAD Well: J-13 Location: Wellhead, Prudhoe Bay, Alaska Job Number: AK0608G 133 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH B EARING SEVERITY DEPTH DIST. AZIMUTH COOR DINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 11450.00 30.61 39.30 N 39 18 E 0.24 9142.37 5942.6 33.3 4965.91 N 3264.08 E 11475.00 30.54 39.14 N 39 9 E 0.11 9163.90 5955.2 33.3 4975.76 N 3272.12 E 11500.00 30.31 39.06 N 39 4 E 0.23 9185.46 5967.8 33.3 4985.58 N 3280.10 E 11525.00 30.20 38.85 N 38 51 E 0.15 9207.05 5980.4 33.4 4995.38 N 3288.02 E 11550.00 30.05 38.72 N 38 43 E 0.17 9228.67 5992.9 33.4 5005.16 N 3295.88 E 11575.00 29.90 38.64 N 38 38 E 0.16 9250.33 6005.3 33.4 5014.91 N 3303.69 E 11577.28 29.93 38.65 N 38 39 E 0.34 9252.31 6006.4 33.4 5015.80 N 3304.40 E Final Station Closure: Distance: 6006.44 ft Az: 33.38 deg. 20 B.P. Exploration (Alaska) Inc Interp Inrun -Well: J-PAD J-13 Gyrodata Location: Wellhead, Prudhoe Bay, Alaska nun~nQr_ , ~~ r,~cTnir-rT~~~ 500 450 400 350( 300( .-. w C~ z = 250( O z 2000 1500 1000 500 0 • C: FASTING (ft) B.P. Exploration (Alaska} Inc -Well: J-PAD J-13 Location: Wellhead, Prudhoe Bay, Alaska 5.0 4.! 4.( 3.~ w N ~ 3.C a~ -v .~ w 2.5 w C7 ~ 2.0 C~ O 1.5 1.0 0.5 0.0 Interp Inrun Gyrodata AK0608G 133 DEFTNiTTVF B OM HC M :11577. • • -~~~ --~~~ ~~~~ ~~~~ ~~~~ ~~~~ i~w rsuuu yuuu 10000 11000 12000 13000 MEASURED DEPTH (ft) B.P. Exploration (Alaska) Inc Well: )-PAD )-13 Interp Inrun Gyrodata AK0608G 133 DEFINITIVE 6( 5~ 5( 4~ 4C z ~ 35 H z v 30 z 25 20 15 10 5 0 TED • • y~~~ ~~~~ ~~~~ ~rvvv ~uvu ouuu iuuu tsuuu y000 10000 11000 12000 13000 MEASURED DEPTH (ft) N Q B.P. Exploration (Alaska) Inc Weil: J-PAD J-13 Location: Wellhead. Prudhoe Bav. Alaska 40 20 0 340 320 300. 280, 260, 240. 220. 200. 180. 160. 140. 120. 100. Interp Inrun Gyrodata AK0608G_133 DEFINITIVE 0~- o-I- `O-I- 0 0 D~ rTOM H LE ;ATE D 11577. 8 ~ luuv cuvu suvu ~+uuu buuu buuu ~uUU tfUUU 9000 10000 11000 12000 13000 MEASURED DEPTH (ft) • Survey QC - RGS-CT Acceptance Sheet ~..~.~.. FIELD AND SIIRVFV rNFnRMerrnN Operator BP EXPLORATION (ALASKA) INC Fieid~/ Platform Weli Number ] -PAD J - 13 Survey section From 2383.00 ft. to 11551.00 ft. Date 9/ 11/ 2008 Gyrodata Job No AK0608G_133 Gyrodata Surveyors Steve Thompson ]ob Objective High Accuracy Gyro Survey SURVEY PFR FnRMeN(^F In Spec' QC Parameter Yes/No/NA Possible Actions Operational temperature within Yes Contact Duty Engineer to discuss options: 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Toolface rate within specification Yes Contact Duty Engineer to discuss options: Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: -Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either Inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q366 (OPS SUR-MA-003) 13~" Nov 03 /Revision 12 Page 1 of 1 AK0608G_133 Survey QC - RGS-CT Analysis Sheet ~~ SURVEY QUALITY CONTROL -DATA ANALYSIS REFERENCE cVCTRnac Grid S stem Grid Correction 0.00 Azimuth reference: Grid True North TRUE NORTH Vertical reference: RKB MSL Other If other ive details TIE ON Dere De th Northin s 0.00 0.00 Inclination Eastin s 0.00 0.00 Azimuth Latitude 0.00 TVD 0.00 70 3264 Az. Ref: Grid/True Grid Corrected Y N? . Descri tion CALIBRATION Tool Number 6051 Calibration Date 29 Mar 2008 OPERATING TEMPERA 1 INITIALISATION - Withi De th A rox 2400.03 No of stns 9 Sec' -Min No. - 6 Azimuth Mean 24.25 Std deviation 0.03 Sec' - Azi SD 0 2° Inclination Mean 13.53 Std deviation 0.00 . Sec' -Inc SD 0 1° Earth Horizontal Rate Mean Abs meas-theor 0.01 Std deviation 0.01 . Sec' -See 167 DRIFT TUNE Residual x ro bias Mean -0.000 Std dev' 0.004 Sec's -Mean and SD - 0.333° hr Residual ro bias Mean 0.000 Std dev' 0.009 Spec's -Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 16.13 Sec' - 400 sec IN/OUT CONIPeRTGAN le77' lu in re rnir~ ~~ roe Inclination Difference Mean 0.15 Std dev' 0.11 Sec's -Casin 0.3° Drill i e 0.3° Azimuth Difference Mean 0.12 Std dev' 0.18 Sec's -Casin 0.5° Drill i e 0.75° Lateral Diver ence/1000 1.85 Sec - 5.0 1000 Vertical Diver ence 1000 1.52 Sec' - 2.0/1000 DEPTH Cf1NTRA1 Wireline Com an Schlumber er Line a 15 32 Encoder SF Schlumber er Max De th TD 11577.3 CCL Corrected Yes Zero De th Ri u RKB Rezero De th 6 Given u 'oint de th 10193 Measured PJ 10189 Strech cor. At TD divided b TD 1000 .77 Sec' - 1.5 1000 Dif. Between ri u and rezero de the divided b TD 1000 Dif. Between iven and meas de th divided b meas 1000 .51 .35 Sec' - 2.0/1000 Sec' - 2.0 1000 SURV-Q365 (OPS SUR-MA-010) 22n° lan 2004 /Revision 20 Page 1 of 1 AK0608G_133 Survey QC - RGS-CT~pecification Sheet SURVEY QUALITY CONTROL -SPECIFICATION DATA INITIALISATION Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERMeas-ERrl,eo) 28 13.53 24.55 0.0448 29 13.53 24.47 0.0501 30 13.53 24.55 0.0419 31 13.53 24.54 0.0293 32 13.53 24.54 0.0567 33 13.53 24.53 0.0617 34 13.53 24.57 0.0753 35 13.53 24.50 0.0657 36 13.53 24.53 0.0796 Average 13.53 24.53 0.0561 Tolerance on Average* 0.0851 Standard Deviation 0.00 0.03 0.0154 Tolerance on St. Dev.** 0.1~ 0.2~ 0.0428 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * J[(COSA*Sint*0.1)Z+0.Ort2] o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/CosI) *J((cosA*SinI*0.1)~+(0.08z/(n-1))] o/hr DRTFT TI INFC Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1503.39 4291.03 42.73 28.59 0.000 0.001 0.001 0.005 2 1457.59 6178.75 40.09 33.79 -0.002 0.003 -0.005 0.010 3 1184.53 7662.12 43.43 33.05 -0.003 0.004 -0.005 0.009 4 1518.37 9562.62 45.74 34,98 -0.005 0.004 -0.012 0.017 5 1670.03 11551.03 29.85 38.65 0.001 0.003 0.000 -0.002 6 638.42 11509.98 29.90 38.22 -0.000 0.001 -0.001 -0.001 7 1457.67 9557.62 45.43 34.72 0.001 0.002 0.000 -0.001 8 1336.32 7664.84 43.27 32.99 0.005 -0.006 0.012 -0.014 9 1123.93 6171.01 39.88 33.72 0.003 -0.005 0.009 -0.010 10 1397.06 4277.55 42.27 28.69 0.003 -0.006 0.009 -0.010 11 1336.28 2383.19 13.78 25.89 -0.000 -0.005 0.001 -0.002 Average 0.000 -0.000 0.001 0.000 Standard Deviation 0.003 0.004 0.007 0.009 Tolerance for both the Average and the Standard Deviation 0.033/hr 0.033/hr 0.033/hr 0.033/hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.48 0.04 0.44 241.27 358.10 -116.83 SURV-Q367 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 1 of SO AK0608G 133 Survey QC - RGS-CT pecification Sheet 200.00 0.50 0.08 0.42 157.00 356.20 160.80 300.00 0.61 0.37 0.24 193.78 285.37 -91.59 400.00 0.37 0.70 -0.33 177.46 201.43 -23.97 500.00 0.89 0.71 0.18 165.51 183.80 -18.29 600.00 0.47 0.66 -0.18 175.70 178.31 -2.61 700.00 0.34 0.66 -0.33 143.84 148.13 -4.29 800.00 0.52 0.68 -0.17 149.34 113.65 35.69 900.00 0.24 0.55 -0.31 160.56 80.62 79.94 1000.00 0.48 0.39 0.09 114.49 47.84 66.65 1100.00 0.36 0.34 0.02 353.05 72.26 -79.21 1200.00 0.37 0.31 0.06 322.13 105.67 -143.54 1300.00 0.41 0.37 0.04 26.97 35.22. -8.25 1400.00 0.43 0.43 0.00 12.06 311.08 60.97 1500.00 0.39 0.44 -0.06 345.78 267.92 77.86 1600.00 0.09 0.45 -0.36 134.60 229.60 -95.00 1700.00 0.38 0.41 -0.04 289.08 222.53 66.54 1800.00 0.38 0.37 0.01 186.40 218.90 -32.50 1900.00 0.40 0.99 -0.58 156.50 142.48 14.02 2000.00 1.76 1.66 0.09 57.55 58.64 -1.09 2100.00 4.41 4.36 0.05 24.49 33.34 -8.84 2200.00 7.08 7.26 -0.18 10.07 13.77 -3.70 2300.00 10.43 10.42 0.01 17.91 18.48 -0.57 2400.00 13.60 13.60 -0.01 24.67 25.38 -0.71 2425.00 14.65 14.56 0.09 25.95 26.83 -0.88 2450.00 15.59 15.48 0.11 27.15 27.89 -0.74 2475.00 16.13 16.03 0.10 27.79 28.40 -0.61 2500.00 16.87 16.77 0.10 28.20 28.85 -0.65 2525.00 17.69 17.60 0.09 28.76 29.34 -0.59 2550.00 18.28 18.22 0.06 28.94 29.48 -0.55 2575.00 19.25 19.22 0.03 29.06 29.56 -0.50 2600.00 20.58 20.60 -0.02 29.53 29.99 -0.46 2625.00 21.49 21.40 0.09 29.68 30.10 -0.42 2650.00 22.14 21.99 0.14 29.74 30.02 -0.28 2675.00 22.47 22.31 0.16 29.75 30.06 -0.31 2700.00 22.67 22.51 0.15 29.79 30.12 -0.33 2725.00 22.95 22.79 0.16 30.03 30.45 -0.41 2750.00 23.26 23.12 0.14 30.63 31.02 -0.39 2775.00 23.77 23.68 0.09 31.07 31.37 -0.29 2800.00 24.77 24.68 0.09 30.88 31.19 -0.30 2825.00 25.31 25.20 0.12 30.91 31.12 -0.21 2850.00 25.72 25.61 0.11 30.85 31.08 -0.23 2875.00 26.25 26.12 0.13 30.86 31.06 -0.20 2900.00 26.82 26.71 0.11 30.65 30.84 -0.19 2925.00 27.44 27.33 0.12 30.38 30.54 -0.17 2950.00 28.18 28.09 0.08 30.15 30.28 -0.13 SURV-Q367 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page 2 of 10 AK0608G_133 Survey QC - RGS-CT pecification Sheet ~~ Lyl5.00 28.88 28.79 0.09 30.08 30.19 -0 11 3000.00 29.56 29.43 0.13 30.29 30.45 . -0 16 3025.00 29.99 29.85 0.14 30.20 30.38 . -0 19 3050.00 30.33 30.17 0.17 30.26 30.44 . -0.17 3075.00 30.65 30.50 0.15 30.28 30.39 -0.12 3100.00 30.89 30.74 0.15 30.41 30.47 -0 07 3125.00 31.10 30.92 0.17 30.52 30.65 . -0 13 3150.00 31.41 31.25 0.16 30.52 30.66 . -0.14 3175.00 31.71 31.55 0.16 30.46 30.56 -0.10 3200.00 32.03 31.88 0.15 30.34 30.43 -0.09 3225.00 32.45 32.29 0.16 30.13 30.22 -0 09 3250.00 32.76 32.61 0.15 30.15 30.22 . -0 07 3275.00 33.18 33.02 0.16 30.01 30.06 . -0 05 3300.00 33.60 33.48 0.12 30.01 30.06 . -0.05 3325.00 34.29 34.20 0.09 29.74 29.76 -0.02 3350.00 35.33 35.24 0.09 29.35 29.33 0.02 3375.00 35.97 35.86 0.11 29.10 29.09 0.02 3400.00 36.56 36.44 0.11 28.86 28.84 0.02 3425.00 37.14 37.00 0.14 28.76 28.75 0.01 3450.00 37.57 37.45 0.12 28.71 28.74 -0.03 3475.00 38.02 37.90 0.12 28.63 28.66 -0.02 3500.00 38.53 38.42 0.11 28.59 28.61 -0.02 3525.00 39.08 38.96 0.13 28.52 28.49 0.03 3550.00 39.69 39.60 0.09 28.41 28.32 0.09 3575.00 40.26 40.13 0.13 28.18 28.14 0.04 3600.00 40.72 40.58 0.14 28.03 28.03 -0.01 3625.00 41.15 41.05 0.10 27.98 27.95 0.03 3650.00 41.59 41.47 0.12 28.00 27.98 0.03 3675.00 42.11 42.02 0.10 28.05 28.03 0.03 3700.00 42.63 42.49 0.14 28.02 27.98 0.04 3725.00 43.03 42.90 0.13 27.99 27.96 0.03 3750.00 43.49 43.37 0.12 27.91 27.91 -0.00 3775.00 43.83 43.68 0.16 27.98 27.94 0.04 3800.00 43.65 43.49 0.15 27.78 27.73 0.05 3825.00 43.77 43.60 0.17 27.74 27.71 0.03 3850.00 43.91 43.76 0.16 27.76 27.71 0.06 3875.00 44.02 43.83 0.20 27.81 27.75 0.06 3900.00 43.95 43.75 0.19 27.76 27.73 0.03 3925.00 43.75 43.60 0.15 27.69 27.63 0.06 3950.00 43.70 43.48 0.22 27.65 27.63 0.02 3975.00 43.63 43.46 0.18 27.71 27.68 0.03 4000.00 43.58 43.41 0.17 27.66 27.61 0.04 4025.00 43.62 43.39 0.22 27.71 27.66 0.04 4050.00 43.33 43.13 0.20 27.69 27.65 0.04 4075.00 43.28 43.10 0.18 27.66 27.62 0.04 SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 3 of 30 AK0608G 133 Survey QC - RGS-CT~pecification Sheet 4100.00 43.51 43.36 0.15 27.69 27.66 0 03 4125.00 43.70 43.53 0.17 27.60 27 61 . -0 01 4150.00 43.64 43.44 0.20 27.66 . 27.62 . 0 04 4175.00 43.46 43.26 0.20 27.72 27.66 . 0.06 4200.00 43.29 43.11 0.17 27.73 27.69 0 04 4225.00 43.16 42.93 0.23 27.88 27.87 . 0 01 4250.00 42.88 42.67 0.22 28.14 28.14 . -0 00 4275.00 42.63 42.45 0.18 28.47 28.45 . 0 02 4300.00 42.57 42.35 0.22 28.55 28.54 . 0.01 4325.00 42.43 42.22 0.22 28.73 28.69 0 04 4350.00 42.49 42.30 0.19 28.74 28.69 . 0 04 4375.00 42.50 42.26 0.24 28.67 28.59 . 0 08 4400.00 42.38 42.17 0.21 28.92 28.88 . 0 04 4425.00 42.05 41.86 0.19 29.00 28.99 . 0.01 4450.00 42.24 42.03 0.21 28.98 28.93 0 05 4475.00 42.38 42.17 0.21 29.01 28.94 . 0 07 4500.00 42.02 41.77 0.24 29.09 29.02 . 0 07 4525.00 41.99 41.80 0.20 29.10 29.05 . 0 06 4550.00 42.02 41.84 0.18 29.08 29.01 . 0.07 4575.00 42.16 41.92 0.24 29.14 29.08 0 06 4600.00 41.95 41.72 0.23 29.06 28.97 . 0 09 4625.00 41.82 41.62 0.20 29.07 28.99 . 0 07 4650.00 41.68 41.46 0.22 29.21 29.07 . 0 14 4675.00 41.76 41.57 0.19 29.22 29.15 . 0.07 4700.00 41.73 41.49 0.23 29.36 29.32 0 05 4725.00 41.49 41.27 0.22 29.54 29.47 . 0 07 4750.00 41.46 41.26 0.20 29.91 29.86 . O dS 4775.00 41.17 40.96 0.21 30.22 30.16 . 0 05 4800.00 41.09 40.87 0.21 30.44 30.37 . 0.07 4825.00 40.98 40.76 0.22 30.60 30.50 0 11 4850.00 40.72 40.54 0.18 30.72 30.64 . 0 08 4875.00 40.70 40.46 0.24 30.73 30.61 . 0 12 4900.00 40.72 40.54 0.18 30.86 30.76 . 0.10 4925.00 40.64 40.40 0.24 30.92 30.80 0.12 4950.00 40.56 40.36 0.20 30.87 30.83 0 05 4975.00 40.66 40.49 0.17 30.99 30.87 . 0 13 5000.00 40.58 40.35 0.22 31.00 30.87 . 0.13 5025.00 40.56 40.37 0.20 30.98 30.89 0.09 5050.00 40.54 40.34 0.20 31.03 30.88 0.15 5075.00 40.36 40.15 0.21 30.96 30.82 0.14 5100.00 40.37 40.18 0.19 31.13 31.02 0.11 5125.00 40.40 40.24 0.16 31.23 31.11 0.12 5150.00 40.33 40.13 0.20 31.16 31.01 0.15 5175.00 40.25 40.03 0.23 31.22 31.11 0.11 5200.00 39.89 39.70 0.20 31.21 31.08 0.13 SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 4 of 30 AK0608G 133 Survey QC - RGS-CT Specification Sheet _~ 5225.00 40.03 39.86 0.16 31.27 31.14 0.13 5250.00 40.07 39.87 0.20 31.25 31.15 0.10 5275.00 39.95 39.74 0.21 31.19 31.07 0.11 5300.00 39.58 39.38 0.21 31.26 31.14 0.12 5325.00 39.51 39.34 0.18 31.32 31.20 0.12 5350.00 39.37 39.18 0.19 31.38 31.28 0.11 5375.00 39.37 39.18 0.19 31.58 31.46 0.12 5400.00 39.20 39.02 0.18 31.90 31.79 0.11 5425.00 39.33 39.19 0.15 32.07 31.97 0.10. 5450.00 39.47 39.26 0.21 32.05 31.93 0.12 5475.00 39.24 39.06 0.18 32.23 32.12 0.11 5500.00 39.14 38.96 0.19 32.23 32.15 0.08 5525.00 39.24 39.03 0.21 32.47 32.36 0.12 5550.00 39.13 38.95 0.18 32.47 32.35 0.12 5575.00 38.96 38.74 0.22 32.81 32.73 0.07 5600.00 38.82 38.64 0.19 33.22 33.10 0.12 5625.00 38.81 38.61 0.20 33.79 33.70 0.09 5650.00 38.93 38.73 0.20 34.14 34.02 0.12 5675.00 38.93 38.74 0.19 34.14 34.05 0.10 5700.00 38.93 38.74 0.19 34.15 34.06 0.09 5725.00 38.94 38.74 0.20 34.21 34.13 0.07 5750.00 39.14 38.96 0.18 34.22 34.12 0.10 5775.00 39.37 39.20 0.18 34.26 34.17 0.09 5800.00 39.45 39.25 0.20 34.19 34.12 0.07 5825.00 39.29 39.10 0.19 34.26 34.14 0.12 5850.00 39.48 39.28 0.19 34.30 34.22 0.08 5875.00 39.66 39.47 0.20 34.37 34.29 0.08 5900.00 39.74 39.55 0.19 34.35 34.27 0.08 5925.00 39.74 39.54 0.20 34.29 34.22 0.07 5950.00 39.71 39.52 0.19 34.29 34.20 0.09 5975.00 39.54 39.35 0.20 34.19 34...11 0.08 6000.00 39.67 39.48 0.19 34.17 34.09 0.08 6025.00 39.79 39.59 0.20 34.10 34.02 0.07 6050.00 39.63 39.44 0.20 34.17 34.11 0.06 6075.00 39.63 39.43 0.20 34.10 34.03 0.07 6100.00 39.77 39.56 0.20 34.03 33.97 0.06 6125.00 39.80 39.60 0.20 33.95 33.91 0.04 6150.00 39.84 39.65 0.20 33.96 33.91 0.05 6175.00 39.89 39.69 0.21 33.88 33.85 0.03 6200.00 39.91 39.70 0.21 33.84 33.81 0.03 6225.00 40.09 39.89 0.20 33.73 33.72 0.02 6250.00 40.02 39.79 0.23 33.73 33.71 0.02 6275.00 40.13 39.88 0.24 33.80 33.74 0.06 6300.00 39.86 39.68 0.19 33.72 33.68 0.03 6325.00 39.72 39.48 0.24 33.71 33.67 0.03 SURV-Q167 (OPS SUR-MA-003) 19`h Nov 03 /Rev 15 Page 5 of SO AK0608G_333 Survey QC - RGS-CT pecification Sheet .~~ o3~u.uu .iy.y~i 39.69 0.24 33.66 33.60 0 06 6375.00 40.45 40.19 0.26 33.70 33.69 . 0 01 6400.00 40.71 40.47 0.24 33.55 33.49 . 0 06 6425.00 40.96 40.70 0.26 33.37 33.29 . 0.08 6450.00 41.06 40.85 0.21 33.41 33.37 0 04 6475.00 40.89 40.66 0.22 33.41 33.32 . 0 09 6500.00 40.93 40.69 0.24 33.35 33.29 . 0 05 6525.00 41.11 40.89 0.22 33.35 33 28 . 0 07 6550.00 41.31 41.07 0.24 33.35 . 33.31 . 0.04 6575.00 41.33 41.10 0.23 33.35 33.26 0 09 6600.00 41.24 41.02 0.22 33.48 33.41 . 0 07 6625.00 41.47 41.22 0.24 33.49 33.42 . 0 08 6650.00 41.45 41.26 0.20 33.55 33.47 . 0 09 6675.00 41.48 41.28 0.20 33.41 33.33 . 0.08 6700.00 41.42 41.18 0.24 33.44 33.33 0 10 6725.00 41.70 41.47 0.23 33.53 33.44 . 0 09 6750.00 41.95 41.75 0.20 33.41 33.30 . 0 11 6775.00 41.70 41.51 0.20 33.49 33.38 . 0 11 6800.00 41.50 41.32 0.18 33.56 33.43 . 0.13 6825.00 41.67 41.43 0.24 33.46 33.36 0 09 6850.00 41.89 41.65 0.24 33.55 33.42 . 0 14 6875.00 41.83 41.64 0.19 33.50 33.35 . 0 14 6900.00 41.70 41.47 0.23 33.61 33.47 . 0 14 6925.00 41.43 41.22 0.21 33.66 33.53 . 0.14 6950.00 41.46 41.25 0.20 33.70 33.58 0.11 6975.00 41.50 41.27 0.24 33.73 33.60 0.14 7000.00 41.32 41.13 0.19 33.68 33.61 0.07 7025.00 41.33 41.12 0.21 33.66 33.60 0.06 7050.00 41.25 41.03 0.23 33.73 33.60 0.13 7075.00 41.33 41.12 0.22 33.75 33.63 0.11 7100.00 41.31 41.12 0.19 33.79 33.66 0.13 7125.00 41.12 40.89 0.23 33.79 33.67 0.12 7150.00 40.93 40.78 0.15 33.72 33.59 0.14 7175.00 41.08 40.83 0.24 33.78 33.65 0.13 7200.00 41.02 40.78 0.24 33.76 33.68 0.08 7225.00 41.06 40.90 0.17 33.82 33.67 0.14 7250.00 41.02 40.80 0.22 33.79 33.69 0.11 7275.00 40.90 40.66 0.25 33.81 33.71 0.11 7300.00 41.01 40.78 0.23 33.90 33.75 0.14 7325.00 41.03 40.79 0.24 33.85 33.71 0.15 7350.00 40.90 40.68 0.21 33.82 33.72 0.10 7375.00 41.12 40.83 0.28 33.82 33.61 0.20 7400.00 41.34 41.07 0.26 33.63 33.55 0.07 7425.00 41.39 41.16 0.23 33.38 33.27 0.11 7450.00 41.67 41.43 0.25 33.40 33.27 0.14 SURV-Q367 (OPS SU R-MA-003) 19th Nov 03 /Rev iS Page 6 of 30 AK0608G 133 Survey QC - RGS-CT pecification Sheet i4i5.uu 41.91 41.64 0.27 33.26 33.17 0 09 7500.00 42.04 41.81 0.23 33.15 33.01 . 0 14 7525.00 42.31 42.05 0.26 33.18 33.03 . 0 15 7550.00 42.27 42.02 0.25 33.12 33.00 . 0.13 7575.00 42.55 42.32 0.23 33.21 33.12 0 09 7600.00 42.86 42.60 0.26 33.10 32.94 . 0 16 7625.00 42.91 42.65 0.25 33.02 32.90 . 0 12 7650.00 43.01 42.78 0.22 33.07 32.93 . 0 14 7675.00 43.40 43.12 0.28 33.08 32.95 . 0.13 7700.00 43.40 43.17 0.24 33.03 32.92 0 11 7725.00 43.59 43.36 0.24 33.02 32.94 . 0 08 7750.00 43.74 43.46 0.28 33.08 32.94 . 0 14 7775.00 43.83 43.62 0.21 33.08 32.97 . 0 11 7800.00 44.02 43.81 0.21 33.07 32.91 . 0.16 7825.00 44.01 43.77 0.24 33.14 32.98 0 16 7850.00 43.95 43.74 0.21 33.24 33.07 . 0 18 7875.00 44.08 43.88 0.20 33.47 33.31 . 0 17 7900.00 44.03 43.82 0.21 33.60 33.40 . 0 20 7925.00 43.92 43.74 0.18 33.92 33.78 . 0.14 7950.00 44.06 43.83 0.23 34.09 33.90 0 19 7975.00 44.05 43.81 0.25 34.37 34.14 . 0 23 8000.00 44.17 43.98 0.20 34.51 34.34 . 0 17 8025.00 44.50 44.26 0.24 34.64 34.45 . 0 19 8050.00 44.85 44.58 0.27 34.69 34.53 . 0.16 8075.00 45.31 45.07 0.24 34.74 34.53 0 21 8100.00 45.95 45.68 0.26 34.80 34.61 . 0 19 8125.00 46.48 46.13 0.34 34.96 34.70 . 0 25 8150.00 47.48 47.23 0.24 35.01 34.82 . 0 19 8175.00 48.41 48.08 0.32 35.09 34.88 . 0.21 8200.00 49.20 48.86 0.34 35.09 34.82 0 27 8225.00 50.18 49.95 0.24 35.08 34.85 . 0.23 8250.00 50.94 50.65 0.29 35.03 34.85 0 19 8275.00 51.67 51.43 0.23 35.12 34.89 . 0.23 8300.00 52.44 52.21 0.24 35.15 34.90 0.25 8325.00 53.08 52.78 0.30 35.22 34.97 0.25 8350.00 53.73 53.50 0.23 35.18 34.89 0.29 8375.00 54.58 54.32 0.26 35.26 35.02 0.25 8400.00 55.26 54.98 0.28 35.23 34.97 0.26 8425.00 56.06 55.85 0.22 35.23 34.98 0.25 8450.00 57.04 56.76 0.28 35.16 34.89 0.27 8475.00 57.88 57.60 0.28 35.24 34.98 0.26 8500.00 58.53 58.32 0.21 35.33 35.00 0.32 8525.00 59.37 59.10 0.27 35.18 34.91 0.27 8550.00 59.87 59.64 0.23 35.26 34.94 0.33 8575.00 60.55 60.36 0.19 35.35 35.05 0.30 SURV-Q367 (OPS SUR-MA-003) 19`h Nov 03 /Rev 15 Page 7 of 10 AK0608G_333 Survey QC - RGS-CT pecification Sheet ~- ~.~ 8600.00 61.05 60.84 0.20 35.24 34.94 0.30 8625.00 60.98 60.83 0.15 35.09 34.79 0.30 8650.00 60.90 60.75 0.15 35.05 34.78 0 27 8675.00 60.75 60.61 0.15 35.11 34.78 . 0.33 8700.00 60.49 60.37 0.11 35.11 34.82 0.29 8725.00 60.43 60.26 0.16 35.00 34.70 0.30 8750.00 60.14 59.98 0.16 34.97 34.65 0.32 8775.00 59.87 59.76 0.11 35.01 34.70 0 32 8800.00 59.77 59.64 0.14 35.06 34.72 . 0.34 8825.00 59.66 59.51 0.16 35.14 34.84 0.30 8850.00 59.41 59.34 0.08 35.12 34.83 0.29 8875.00 59.36 59.19 0.17 35.05 34.76 0.29 8900.00 58.98 58.87 0.11 34.96 34.65 0.31 8925.00 58.06 58.02 0.04 35.19 34.85 0.34 8950.00 56.63 56.61 0.02 35.43 35.13 0.31 8975.00 55.37 55.29 0.08 35.56 35.27 0.29 9000.00 54.23 54.11 0.12 35.33 35.05 0.28 9025.00 53.29 53.18 0.11 35.05 34.73 0.32 9050.00 52.45 52.42 0.04 35.26 34.92 0.35 9075.00 51.06 51.01 0.04 35.57 35.17 0.40 9100.00 49.50 49.42 0.08 35.75 35.44 0.30 9125.00 48.14 48.09 0.05 35.96 35.65 0.31 9150.00 47.44 47.32 0.12 36.27 36.04 0.23 9175.00 47.09 46.93 0.16 36.18 36.00 0.18 9200.00 46.79 46.68 0.11 35.88 35.66 0.22 9225.00 46.83 46.63 0.20 35.92 35.68 0.24 9250.00 46.85 46.66 0.19 35.86 35.64 0.23 9275.00 46.93 46.74 0.19 35.84 35.61 0.22 9300.00 46.93 46.76 0.18 35.67 35.52 0.15 9325.00 46.88 46.70 0.18 35.68 35.40 0.28 9350.00 46.70 46.50 0.20 35.84 35.66 0.18 9375.00 46.77 46.57 0.19 35.76 35.55 0.20 9400.00 46.49 46.31 0.19 35.85 35.61 0.24 9425.00 46.23 46.06 0.17 35.68 35.42 0.26 9450.00 46.21 46.00 0.21 35.74 35.51 0.22 9475.00 46.08 45.88 0.20 35.58 35.41 0.18 9500.00 46.11 45.91 0.20 35.38 35.12 0.26 9525.00 46.21 45.99 0.22 35.28 35.06 0.22 9550.00 46.01 45.82 0.20 35.35 35.14 0.21 9575.00 46.11 45.92 0.20 35.34 35.13 0.21 9600.00 45.86 45.65 0.21 35.11. 34.92 0.19 9625.00 45.33 45.17 0.16 34.84 34.65 0.19 9650.00 44.34 44.15 0.20 34.90 34.73 0.17 9675.00 43.42 43.20 0.22 35.05 34.88 0.18 9700.00 42.87 42.62 0.25 35.13 35.02 0.10 SURV-Q167 (OPS 5UR-MA-003) 19v' Nov 03 /Rev 15 Page 8 of 10 AK0608G 133 Survey QC - RGS-CT Specification Sheet / 7/~5.uu 42.85 42.61 0.24 34.69 34.57 0 13 9750.00 42.66 42.41 0.26 34.92 34.70 . 0 22 9775.00 42.67 42.42 0.25 35.05 34.92 . 0 12 9800.00 42.64 42.37 0.26 34.63 34.50 . 0.13 9825.00 42.62 42.35 0.27 34.44 34.31 0 12 9850.00 42.67 42.44 0.23 34.11 33.97 . 0 14 9875.00 42.57 42.34 0.24 34.16 33.99 . 0 17 9900.00 42.46 42.22 0.24 34.15 34.02 . 0 13 9925.00 42.53 42.28 0.24 34.22 34.05 . 0.16 9950.00 42.56 42.32 0.24 34.28 34.11 0 17 9975.00 42.34 42.08 0.26 34.38 34.23 . 0 15 10000.00. 42.55 42.33 0.22 34.26 34.17 . 0 09 10025.00 42.46 42.20 0.26 34.54 34.34 . 0 20 10050.00 42.31 42.08 0.23 34.78 34.61 . 0.18 10075.00 42.48 42.24 0.24 34.99 34.85 0 14 10100.00 42.42 42.16 0.26 34.95 34.84 . .0 11 10125.00 42.39 42.17 0.22 34.93 34.69 . 0 24 10150.00 42.40 42.13 0.27 35.44 35.24 . 0 20 10175.00 42.45 42.17 0.28 35.31 35.20 . 0.11 10200.00 42.55 42.34 0.21 35.01 34.90 0 11 10225.00 42.37 42.14 0.22 35.38 35.21 . 0 17 10250.00 42.53 42.25 0.28 35.26 34.94 . 0 32 10275.00 42.09 42.06 0.02 35.14 34.73 . 0 41 10300.00 42.11 42.10 0.00 35.48 35.08 . 0.40 10325.00 42.14 42.13 0.01 35.51 35.12 0.40 10350.00 42.05 42.00 0.05 35.50 35.16 0.34 10375.00 42.02 41.77 0.26 35.66 35.33 0.32 10400.00 41.91 41.90 0.01 35.79 35.48 0.30 10425.00 41.63 41.61 0.02 35.84 35.51 0.33 10450.00 41.70 41.64 0.06 35.96 35.63 0.33 10475.00 41.70 41.66 0.04 35.88 35.57 0.31 10500.00 41.51 41.50 0.01 35.87 35.53 0.34 10525.00 41.48 41.44 0.04 36.26 35.92 0.34 10550.00 41.40 41.38 0.03 36.54 36.21 0.33 10575.00 41.25 41.22 0.03 36.72 36.39 0.32 10600.00 41.26 41.21 0.05 36.97 36.63 0.34 10625.00 41.13 41.12 0.01 37.04 36.74 0.31 10650.00 41.05 41.01 0.05 36.97 36.68 0.29 10675.00 40.68 40.69 -0.01 37.06 36.67 0.38 10700.00 40.36 40.35 0.01 37.24 36.91 0.33 10725.00 40.11 40.11 0.00 37.44 37.11 0.33 10750.00 39.75 39.75 0.00 37.49 37.16 0.33 10775.00 39.68 39.63 0.05 37.43 37.09 0.35 10800.00 39.65 39.56 0.10 37.96 37.66 0.30 10825.00 39.11 39.14 -0.02 39.05 38.57 0.48 SURV-Q367 (OPS SU R-MA-003) 19th Nov 03 /Rev 1S Page 9 of 10 AK0608G 133 r Survey QC - RGS-CT Specification Sheet luu~u.uu 38.33 38.40 -0.07 40.48 39.97 0 52 10875.00 37.55 37.60 -0.06 41.77 41 31 . 0 47 10900.00 37.25 37.20 0.05 42.19 . 41.85 . 0 34 10925.00 36.95 36.99 -0.04 41.91 41.63 . 0.28 10950.00 36.74 36.74 0.00 41.65 41.38 0 28 10975.00 36.23 36.27 -0.04 41.60 41.28 . 0 32 11000.00 35.82 35.81 0.01 41.53 41.22 . 0 31 11025.00 35.43 35.44 -0.01 41.42 41.12 . 0 30 11050.00 34.99 35.01 -0.02 41.37 41.06 . 0.32 11075.00 34.79 34.78 0.01 41.35 40.99 0 36 11100,00 34.46 34.49 -0.03 41.23 40.92 . 0 31 11125.00 34.40 34.34 0.06 41.21 40.88 . 0 33 11150.00 34.01 34.01 0.01 41.13 40.83 . 0 30 11175.00 33.91 33.85 0.05 40.97 40.69 . 0.29 11200.00 33.55 33.53 0.01 41.01 40.72 0 30 11225.00 33.17 33.20 -0.03 40.78 40.48 . 0 29 11250.00 32.94 33.00 -0.05 40.63 40.30 . 0 34 11275.00 32.59 32.63 -0.04 40.29 39.97 . 0 32 11300.00 32.17 -32.23 -0.05 40.21 39.82 . 0.39 11325.00 31.91 31.99 -0.08 40.05 39.70 0 34 11350.00 31.49 31.55 -0.05 39.93 39.60 . 0 33 11375.00 31.39 31.43 -0.04 39.57 39.26 . 0 31 11400.00 31.07 31.14 -0.08 39.49 39.15 . 0 34 11425.00 30.85 30.87 -0.02 39.35 38.99 . 0.36 11450.00 30.61 30.66 -0.05 39.30 38.91 0 39 11475.00 30.54 30.57 -0.03 39.14 38.81 . 0.33 11500.00 30.31 30.32 -0.01 39.06 38.69 0 37 .11525.00 30.20 30.29 -0.09 38.85 38.53 . 0 32 11550.00 30.05 30.07 -0.02 38.72 38.35 . 0.37 11575.00 29.90 29.87 0.02 38.64 38.24 0.40 Average 0.1521 0.1229 Standard Deviation 0.1130 0.1777 Tolerance for both the Average and the Standard Casing 0.3~ Casing 0.5~ Deviation Drill i e 0.3~ Drill i e 0 75 * Tnrlinnt•inn ~...1 n-.:......rte . _ ___ _.._ .._....__.........',.....~.... w ~wnc ucNu~~ as ~n~wn. SURV-Q367 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page SO of SO AKO608G 133 • • ALL L _ ~`~AII~v~l1/TT~4L `~. ,_ ProActive Diagnostic Services, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 ~{~.~~~~ MAY ~ 200 RE : Cased Hole/Open Hole/Mechanical Logs and/arTubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn:: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax. (907) 245-8952 i~~ -a~ 3 (p~~S~o 1) Gradient Survey 01-May-08 J-13 2) Signed Print Name: ~~ ' R.~! / 1 l~.l~t.~ jl-~-e-, 1 Color Log / E~ 50-029-20497-00 Date PROACTNE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: .~s~~s:~s€~a~~Cet~3'Sa~r9'sea~~~6oq.L3~a WEBSITE:~+v*u,r7se~439~<<an+~.~~ads C:tDocuments and SetlingstOwner\Desktop\Trmismit_BP.doc ,.. STATE OF ALASKA ~~ ~~ ALA OIL AND GAS CONSERVATION COMf~ION REPORT OF SUNDRY WELL OPERATIONS ,~,>,~ ~ 5 2008 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ ~11~ l~='S (_;,~~;g, ommf Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time xtension ~C(lui uy+r Change Approved Program ~ Operat. Shutdown Perforate Q Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~' Exploratory {~'i iso-os3o 3. Address: P.O. Box 196612 Stratigraphic ! Service ~'. 6. API Number. Anchorage, AK 99519-6612 50-029-20497-00-00 7. KB Elevation (ft): 9. Well Name and Number: 69.1 KB ~ PBU J-13 , 8. Property Designation: 10. Field/Pool(s): ADLO-028281 ~ PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 11800 ~ feet Plugs (measured) None true vertical 9465.19 ~ feet Junk (measured) 11646 Effective Depth measured 11749 feet true vertical 9419 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470 Production 10754 9-5/8" 47# N-80 26 - 10780 26 - 8607.7 6870 4760 Liner 1530 7" 29# L-80 10265 - 11795 8220.17 - 9460.8 8160 7020 Surface 2641 13-3/8" 72# L-80 29 - 2670 26 - 2653 4930 2670 ~(~~~I~E® MAY ~ 200'8 Perforation depth: Measured depth: SEE ATTACHMENT - _ _ _ _ True Vertical depth: _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 10226 - 10333 7" 26# L-80 SURFACE - 10226 Packers and SSSV (type and measured depth) 9-5/8" DV Packer 2603 7" Guiberson Polar Packer 10226 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~' ~,~~ ~ ~ ~~0~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 702 27890 606 2049 Subsequent to operation: SHUT-IN 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory ~ Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas WAG ~' GINJ WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 4/14/2008 Form 10-404 Revised 04/2006 ~ y ~~~ ~ Submit Original Only lion J-13 180-0830 PERF ATTCHMENT MDT MDB NDt TVDB 3/26/1981 4/20/1981 5/2/1981 12/30/1988 1/16/1989 8/18/1990 8/23/1990 8/16/2007 8/17/2007 9/2/2007 4/8/2008 11,146 11,168 8,903.00 8,921.00 PER RPF SQZ SQZ SQZ SQZ RPF 11,178 11,198 8,929.00 8,946.00 PER RPF SQZ SQZ SQZ SQZ RPF 11,208 11,238 8,954.00 8,988.00 PER RPF SQZ SQZ SQZ SQZ RPF 11,248 11,278 8,988.00 9,013.00 PER RPF SQZ SQZ SQZ SQZ RPF 11,293 11,308 9,026.00 9,039.00 RPF RPF 11,293 11,310 9,026.00 9,040.00 APF SQZ RPF SQZ SQZ 11,308 11,310 9,039.00 9,040.00 SOZ AB ABANDO NED PER PERF APf ADD PERF RPF REPERF _ BPP BRIDGE PLUG PU LLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOV ED FCO FILL CLEAN OUT SPS SAND PLUG SET ~ FIL FILL SOF SQUEEZE FAILED _ MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE M1S MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO _ STRADDLE PACK, OPEN OH OPEN HOLE • • • J-13 DESCRIPTION OF WORD COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTiVfTYDATE~ ;: .:, SUMMARY .:: _. ... 4/3/2008' Service swab for Pre S/L 4/6/2008 TII/0= 350/20/0. Temp= SI. tubing & lA PLs (pre-N2 lift). A/L disconnected. Tl3G FL ®1830' (46 bbls). IA 6'L @ surface. 4/6l2008:CTU #9; 1.50" Cail. Job Scope: N2 Lift. MiRU. Pump 1.0" ball for drift of coil. Perform BOP test. RIH with 1.75" JSN. Begin lifting at 3000' ctmd with 750 scf/min N2. Increase rate to 1000scf/min and park coil at 4500' ctmd. Incrementally deepen lift point to 6200' ctmd as well production slugs; park coil at this depth and lift well at 1000 sc#/min N2 rate. Continued on WSR 04/07/08. 4/7/2008~CTU #9 w/ 1.5" OD CT. N2 lift, continued from WSR 04106108. Continue unloading well at 1000 scf/min N2 rate from 6200' ctmd. Well returns the liquids from above our nozzle in a slug, then cycles gas at 1:1 with our nitrogen injection rate. Incrementally deepen lift point to 9800' ctmd; well unloads the wellbore liquids above our nozzle, then cycles gas 1:1 with our nitrogen injection rate. Slowly RIH to 11400' while pumping 1000scf/min N2. Reciprocate between 11400' ctrnd and 9800' c#md while pumping 1000scf/min N2. Wellbare liquids unloaded, no additional contribution from reservoir noted. Discuss plan forward with town engineer. At#empt injectivity test with N2. :Continued on WSR 04/08/08. 4/8/2008`CTU #9 w/ i.5" OD CT. N2 lift, continued from WSR 04107/08. Continue :injectivity test with N2 - no injectivity achieved. Perform MIT-T to 3000 psi with N2 against perforations. MIT-T with N2 passed to 3000 psi, losing $ psi in first fifteen minute interval and $ psi in second fifteen minute interval for a total loss of 16 psi in 30 minutes. Bleed WHP to 1600 psi and pull to surface. MU and RIH with SLB GR/CCL memory logging tool for perforation correlation log. Log .interval 11451' to 11100' ctmd. Paint coil flag. Continue logging to 10900' ctmd. POOH. Confirm good data. MU 3.50" PJ Omega per€orating gun. RIH to flag depth. Correct to top shot at coil flag. RIH to perforating depth. Re-. perforate 11293' - 11308' with 3.50" OD 6 SPF 3506 PJ Omega 72 deg .'phasing (ref: SWS BRCS 09/28/80). No chancre in WHP upon firing pun. `Continued on WSR 04/09/08. 4/9/2008 CTU #9 w/ 1.5" OD CT. Pert, continued from WSR 04!08/08. RIH with spent perf gun to 11430'. Attempt to infect into well Aumpinp 60/40 methanol/water down tail tubing - no injection achieved. MIT-T passed to 2400 psi, with an equivalen# bottom-hole pressure of 4200 psi (see job log for details ofi test). Try to drop spent perf gun on bottom as per program: Attempt to disconnect at lower Baker disconnect. Unsuccessful disconnecting from lower Baker disconnect. Attempt to disconnect at upper Baker disconnect. Unsuccessful ~~disconnecting from ugoer Baker disconnect. :POOH. OOH, Cycle swab from 100' etmd. Secure well. Tag injector stuffing box with coiled tubing connector. Break lubricator and trolley up with injector. 'Obserue what appears to 3.50" perf gun in BOP's. Perf gun static while picking up with injector. Suspect disconnected BHA. Call for man basket and SW S handling equipment. Break lubricator above 8' section and observe uppermost • • disconnect parted, with remainder of toolstring below upper disconnect resting an the swab valve. Recover entire perforating BHA. Recover all balls pumped :during perforating and disconnect operations. Confirm all shots fired with no evidence of a low-order detona#ion, Gap well with 10 bbls 60/40 methanoUwater. Begin RD CTU #9. Job complete. FLUIDS PUMPED BBLS 249 60/40 METH 5 1 % KCL 254 TOTAL I STATE OF ALASKA - ALAS A OIL AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS D D 0< .. 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development Stratigraphic P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 69.1 KB 8. Property Designation: ADLO-028281 , 11. Present Well Condition Summary: Total Depth measured 11800 ,- feet true vertical 9465.19 feet Effective Depth measured 11749 feet true vertical 9419 feet Casing Length Size MD Conductor 80 20" 91.5# H-40 28 - 1 08 Production 10754 9-5/8" 47# N-80 26 - 10780 Liner 1530 7" 29# L -80 10265 - 11795 Surface 2641 13-3/8" 72# L-80 29 - 2670 Perforation depth: Measured depth: 11293' - 11308' True Vertical depth: 9026' - 9039' - - ~ RECEIVt::U ~.¿)? SEP 0 7 2007 ion Stimulate D Other D Waiver D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: .^,Rc ;¡graQII Exploratory Service 180-0830 <' 6. API Number: 50-029-20497-00-00 ~ 9. Well Name and Number: PBU J-13 / 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Plugs (measured) None Junk (measured) 11646' - 11600' TVD 28 - 1 08 26 - 8607.7 8220.17 - 9460.8 26 - 2653 Burst 1490 6870 8160 4930 Collapse 470 4760 7020 2670 ~~NED SEP 2 7 2001 - - 4-1/2" 12.6# L-80 7" 26# L -80 9-5/8" DV Packer 7" Guiberson Polar Packer o o 10226 - 10333 Surface 1022'6"'"'''''' 2603 10226 o o .,..",¡Ji.. Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 27890 606 0 o 0 0 15. Well Class after Droposed work: Exploratory Development ~ 16. Well Status after proposed work: Oil ~ Gas WAG Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 702 Shut-in x 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Tubing pressure 2049 o Service W INJ WDSPL Sundry Number or N/A if C.O. Exempt: N/A Title Data Management Engineer Signature . Date 9/5/2007 SEP ,2 5 2007 '\ \)1-4, su~n~7{t7 .. . . J-13 DESCRITION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/31/2007 *** WELL SHUT IN PRIOR TO ARRIVAL ***(post sqz / pre_perf) DRIFTED W/2 7/8" X 11' DUMMY GUN, TEL & SAMPLE BAILER 11 ,618'ELM (TARGET DEPTH 11 ,308'MD) - SAMPLE OF FILL RECOVERED (APPEARED TO BE FORMATION SAND). *** TURN WELL OVER TO DSO - LEFT WELL SHUT IN*** ***WELL IN ARRIV AL*** INITIAL T/I/O = 600/0/0 PERFORATED FROM 11,293' TO 11,308' W/ 2-7/8" HSD POWER OMEGA HMX CHARGES, 6 SPF. NOT TAGGED. FINAL T/I/O = 500/0/ SHUT IN UPON DEPARTURE. ***JOB COMPLETE*** FLUIDS PUMPED BBLS I 1 DI ESEL 1 TOTAL · STATE OF ALASKA _ ALASKA Oil AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS o o o < 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 69.1 KB 8. Property Designation: ADLO-028281 - 11. Present Well Condition Summary: Total Depth measured 11800 true vertical 9465.19 Effective Depth measured 11749 true vertical 9419 Casing Conductor Production Liner Surface Length 80 10754 1530 2641 Size 20" 91.5# H-40 9-5/8" 47# N-80 7" 29# L-80 13-3/8" 72# L-80 Perforation depth: Measured depth: All perfs sQueezed - True Vertical depth: ...:... Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 702 Shut-in x ~ ~ ,-o;Z Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development P . Stratigraphic Stimulate 0 Other 0 ACID TREATMENT WaiverD Time Extension 0 CEMENT SQUEEZE Re-enter Suspended Well 0 5. Permit to Drill Number: 180-0830 Exploratory Service 6. API Number: 50-029-20497-00-00 - 9. Well Name and Number: PBU J-13 ... feet feet 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool -. ::Þ õ) <n :0:"' Q) S? ;0 m (') m <: m o Plugs (measured) Junk (measured) None 11646' - 11600' J> c CJ) b:) CX1 C2P :t>Ci) :::I Q) g.CI) o n .... 0 Q) :::I ~ CI) f'-) p:?lIa~ 347c¡---.J 34760 ¡;;' !!! 7020 o :::12670 feet feet MD 28 - 108 26 - 10780 10265 - 11795 29 - 2670 TVD 28 - 1 08 26 - 8607.7 8220.17 - 9460.8 26 - 2653 Bu rst 1490 ....~D 8160 4930 ./ S~ANNED SEP 112007 - 4-1/2" 12.6# L-80 7" 26# L -80 9-5/8" DV Packer 7" Guiberson Polar Packer o o 10226 - 10333 Surface 10226' 2603 10226"" o o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 27890 606 0 o 0 0 15. Well Class after Proposed work: Exploratory Development 16. Well Status after proposed work: Oil P Gas WAG Tubing pressure 2049 o Service WDSPl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. WINJ Contact Chris Zamora Form 10-404 Revised 04/2006 0 R Title Petrouem Engineer Phone 564-4138 Date 8/27/2007 SEP 1 0 20D7 Submit Original Only ". . . . . J-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/15/2007 # 9 w/1.75" (Cement availability of Equipment. On Location, Waiting for Rig up and CTU # 9, Begin continued on 08/17/07 WSR. 8/16/2007 Heat uprights (CTU Prep) Circulated 3 UR's of 1%KCL to increase temperature to 180*F. CTU# 9 w/1. 75" (squeeze}, Continue from 08/16/07 WSR. Complete rig up. PT surface equipment. Rig up Cement pumper. Kill well down backside with 650 bbls 1% KCL. Acidize perforations with 50 bbls 12% HCL and 50 bbls 9:1 MUD acid. Batch mix 60 bbls LARC cement. Lay in cement from flag. Close choke/creep coil @ 11080'. Get 500 psi bump. Crack choke, lay in reaming cement. Estimated 4.4 bbls behind pipe. From safety, bump to 1500 psi for 10 min's, 2100 psi for 10 min's and 2300 pSI (2500 DP @ perfs) for 40 min's. Held pressure good @ all steps. Drop ball. Contiminate from 10,000'-11669' w/ bio, reducing rate to 1 bpm across perfs. Make 3 down/2 up passes. Begin chase out @ 80%. Continued on 08/18/07 8/18/2007 CTU # 9, from 08/17/07 out @ 80%, making slow repeats across jewelry. Freeze protect tbg from 2000' w/ water/meth. Trap 900 psi WHP. BOP's. Recover ball. RDMO. ***** Job Complete**** FLUIDS PUMPED BBLS 657 1 % KCL 244 1% KCL W/XS 150 1.5# BIO 400 01 ESEL 45 FRESH WATER 60 LARC CEMENT 100 3% NH4CL 50 12% HCL 50 9:1 MUD ACID 1756 TOTAL . . FRANK H. MURKOWSKI, GOVERNOR AJiASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501·3539 PHONE (907) 279-1433 FAX (907) 276-7542 Chris Zamora Pad Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, J-13 Sundry Number: 306-342 ~C!\\\\~~~fV ""." 'ô 'lnn\ó, "'i\ ;> c.,..·.,;;vlj (y .J;.. Dear Mr. Zamora: Enclosed is the approved Application for Sundry Approval relating to~e above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Ch DATED this It) day of October, 2006 Encl. 15ó-()'63 + J\~v\\~ 6f1 ID{to!DÞ "0 loll.}/o(; I "I-Vl-~~o¡'o fl.-DOle, . STATE OF ALASKA _ 0 CT 0 4 2006 ALASKA OIL AND GAS CONSERVATION COMMIŠ-N APPLICATION FOR SUNDRY APPROvAfska Oil & Gas Cons. Commission Anchorage Abandon Alter casing D Change approved program D 2. Operator Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 1. Type of Request: Suspend Repair well 0 Pull Tubing D 20 AAC 25.280 Operational shutdown Plug Perforations D Perforate New Pool D 4. Current Well Class: Development ø 180-0830 ./ Waiver Stimulate D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: Other Exploratory 0 Stratigraphic 0 / Service 0 6. API Number: 50-029-20497-00-00 ./ Anchorage, AK 99519-6612 7. KB Elevation (It): Descriotive Summaryof Proposal ø Detailed Operations Program 0 BOP Sketch 0 14. Estimated Date for 8. Property Designation: ADLO-028281 11. Total Depth MD (It): 11800 Casing Conductor Surface Production Liner Perforation Depth MD (It): 11293' - 11310' / Packers and SSSV Type: 12. Attachments: Commencing Operations: 16. Verbal Approval: Commission Representative: 9. Well Name and Number: 69.1 KB J-13 / Total Depth TVD (It): 9465.19 10. FieldlPools(s): PRUDHOE BAY Field / PRUDHOE OIL Pool PRESENT WELL CONDITION SUMMARY Effective Depth MD (It): Effective Depth TVD (It): Plugs (measured): 11749' 9419' None Junk (measured): 11646 Collapse 470 2670 4760 7020 Length Size TVD Burst 80' 20" 91.5# H-40 2S' 108' 28' 108' 1490 2641' 13-3/8" 72# L·80 29' 2670' 29' 2653' 4930 10750' 9-5/8" 47# L-80 30' 10780' 30' 8607' 6870 1531' 7" 29# L-80 10264' 11795' 8219' 9461' 8160 Perforation Depth TVD (It): 9026' - 9040' Tubing Grade: L·80 L-80 Tubing MD (It): 31' - 10226' / 10226' - 10333' Tubing Size: 7" 26# 4-1/2" 12.6# 9-5/S" DV Packer 7" Guiberson Polar Packer Packers and SSSV MD (It): 2603' 10226' o 0 o 0 13. Well Class alter proposed work: Exploratory 0 Development ø / / Service 0 1 /1 2006 15. Well Status alter proposed work: Oil ø Gas 0 Plugged 0 WAG 0 GINJ 0 WINJ 0 Abandoned 0 WDSPL 0 Date: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Na Title Contact Chris Zamora Pad Engineer Phone 564-4138 Date COMMISSION USE ONLY 10/2/2006 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity D BOP Test Œ(' Mechanical Integrity Test D Location Clearance D Other: T ~<;. t 80 r E to ?,':) 00 rCA.5· Subsequent Form Required: Approved by: Form 10-403 Revised 11/2004 RBDMS 8Ft 0 CT I ] 2006 APPROVED BY THE COMMISSION Date: If).. /ð ' ().b NER ¡\li~ Submit in Duplicate . . . bp To: C. Olsen I J. Bixby Well Operations Supervisor Date: September 13, 2006 From: Chris Zamora J-Pad Engineer Doug Cismoski Wells Engineer Bryan McLellan Wells Engineer Subject: J-13 Scab Liner PBJPDWL 13-N Est. Cost: $375M Est. lOR: 675 bopd Please run a scab liner in 1-13 as per the attached program. 1. S D&T 2. C Sandback wi 1.75" CT (see attached) 3. S D&T sandback top and dump bail cement cap 4. F Liquid pack lA. 5. 0 RU work platform. BOP test. 6. C Run 980' 3.5" chrome scab liner with 2.375" CT 7. F Pressure test liner/lap 8. C Drill out shoe track, reperforate, FCO and N2lift with 1.75" CT 9. EP Reperforate 11,293' - 11,310' MD (if required) Current Status: Last Test Deviation: Last TO Tag: Last Well Op: Min. Restriction: Latest H2S value: SI due to high GOR 05/30/06: 1,455 BPD; 2,718 BWPD; 58, 357 MCFPD; 40,12 GOR, 65% WC 43° @ the perfs. Max. dev. is 61 ° @ 8,600' MD 04/30/06: Tagged PBTD at 11,653' corr. MD with bailer (343' rat hole) 05/09/06: PPROF (Gas Entry Survey) found major gas jet @ 11,146' MD (corr.) 3.725" @ 10,300' MD (XN Nipple) 10 ppm (est. based on offset) The objective of this program is to run a scab liner for gas shut off. The well has a long history of failed squeezes, so the scab liner is a better long-term solution. The cement job was designed to leave the top of cement 138' below the production casing shoe to for a future big bore coil sidetrack. A liner top packer can be run if cement is lost to formation causing the top / of cement to come in low to design. The leaking squeeze perfs were originally squeezed in 1989 and again in 1990. PPROF run in 1991 showed the squeeze holding. In 1992, gas production began to increase, which was the first indication that the squeeze was leaking. The leaky squeeze was confirmed by a 1994 PPROF. The squeeze further broke down after N2lift and large drawdown were applied to put well back on production post-packer squeeze in late 2004. cc w/a: Well File D. Cismoski B. McLellan cc w/o: 10/2/2006 . . J -13 Scab Liner Program Prepared By: Chris Zamora Phone#: 564-4138(w), 336-1974(h), 952-6699(c) JOB PLANNING DETAILS: Perforations: Leaking squeeze perf @ 11,146' MD. Squeezed perfs: 11,146' -11,168'; 11,178' -11,198'; 11,208' -11,238'; 11,248' - 11,278' Open perfs: 11,293' - 11,310' Perf Deviation: 430 Gas Lift Design: No Gas Lift Mandrels TD Tag History: 04/30/06: D&T tagged @ 11,653' MD (corrected from 11,625' SLM) 11/27/05: SBHP survey tagged TD @ 11,645' SLM 08/02/04: D&T tagged @ 11,642' SLM Injectivity: To be obtained post-sandback Volume to top perf: 423 bbls (tubing = 393, liner to top perf = 30) Scab Liner Specs: -942 feet of 3-1/2" STL 13Cr-80 (Calculated 11,280' - 10,338') (32 jts, Landing Collar, Float Collar, Tapered Float Shoe, and pup joints) Space out liner so float shoe is 5 feet above sandback top. Caution: Well schematic revised to adjust annotated ELMD TT measurement to 10,338'. Reference log is Camco Gas Entry Survey / Jewelry Log from 10/06/91 Cement Calcs: 5' of 7" shoe track (5*.0371) = 0.2 bbls 3-1/2" x 7" annulus from 10,950' - 11,285' (335*.0252) = 8.4 bbls TOTAL = 8.5 bbls (cement top with 8.5 bbls pumped ~ 10,948') Coil String Weight: Dry tagged 11,600' and found 21k lb. weight check at the conclusion of packer squeeze milling operations with 1.75" coil. With well and coil fluid packed. (10/07/05) Pulled up at 10,201' and found 36k lb. weight check with tubing and 2-3/8"coil fluid packed during packer squeeze preparation work. (9/27/05) Coil Volume: At 10,305'- 1.75" Coil: 23.5 bbls 2.375" Coil: 45.2 bbls (0.00228 bbl/ft) (0.004387 bbl/ft) 101212006 2 . . Hydrostatics: Diesel 3080 psi 2%KCl 3872 psi Fracturing Pressure: 5280 psi (assume 0.6 psi/ft) Static: 11127/05: SBHP - 3181 psi @ 8800' TVDSS, SBHT = 1990 F, SI = 5.5 days Comments: Jewelry depths on well schematic do not agree with ELMD from 10/06/91 Jewelry Log. For example, end of tubing is listed as 10,333' on schematic and the log shows it located at The leaking squeeze perfs were originally squeezed in 1989 and again in 1990. PPROF run in 1991 showed the squeeze holding. In 1992, gas production began to increase, which was the first indication that the squeeze was leaking. The leaky squeeze was confirmed by a 1994 PPROF. The squeeze further broke down after N2 lift and large drawdown were applied to put well back on production post-packer squeeze in late 2004. The risk assessment from previous jointed pipe operations with the wellwork platform is attached FYI. Also please refer to the attached references: CTD Liner Running and Cementing Recommended Practice ADW RP for handling and running 13 chrome plus latest pipe dope recommendation. NOTE that operations with the well work platform have been plagued bv delays and high RU costs associated with liquid packing the IA after the RU, leaking tree valves, BOPE test failures, etc. Please attempt to progress the well preparation as far as possible prior to commencing CT operations. Lab testing should be performed on the cement slurry as per Attachment A. Note that a "squeeze slurry" is recommended in order to build additional filter cake in the perf tunnels and voids. 10/2/2006 3 . . 1. RU SL. Drift the tubing and troubleshoot any obstructions encountered. Run XN locator and tag a corrected PBTD. (This will confirm that the no-go is adequate for hanging off the scab liner). Refer to the 6-0ct-1991 Gas Entry Survey and Jewelry Log. The XN ELMD is 10,305' 2. Perform TIFL to insure packer squeeze is still holding. Insure the IA is bled down in order to prevent gas communication to the tubing during the job. The objective is to minimize gas in the tubing that may lead to out-of-balance well conditions, and this is very important. 3. RU CT. MU big hole nozzle and stingers as necessary (minimum ID in the well is 3.725"). 4. Bullhead kill with 250 bbls 2% KCL followed by 350 bbls of diesel (1.5 tubing volumes) at maximum rate. Do not exceed frac pressure of 1400 psi WHP. Cap with diesel to put the well on balance. This should be done with care to strike delicate balance: the well should not be on a screaming vacuum and gas needs to be kept out of the wellbore. 5. RIH and tag PBTD for depth controL 6. Sand back with 20/40 carbolite to 11,285' MD +/- 5' while taking returns. The theoretical volume (bulk density = 13.3 ppg) is 7637 Ibs. Carbolite is recommended due to improved settling at higher hole angles. Multiple attempts may be required depending on the void behind pipe. ultiple batches are recommended for accurate sand placement. Take returns while laying in the and to minimize losses to the formation. Pump at a rate sufficient to prevent free-fall. Allow ufficient settling time between stages. Close the choke and isolate the reel to tag. lease note the actual volume of sand/carbolite used in the WSR summary. 7. When sandback is placed, pull up to -11,250 and pump into the well with 2% KCL at maximum rate or a maximum WHP of 2000 psi. This will confirm that the sand top won't move during subsequent pumping operations. 8. Dry tag the sand top to verify that it hasn't moved. 9. POOH, taking care not to underbalance the well. RDMO. 10. RU SL and determine the corrected top of the sand plug. Dump bail 4 gallons ofLARC (a ~2.5 ft. cement cap) to minimize cement infiltration into the sandback during scab liner cementing work. 101212006 4 . . 11. Bleed the IA and liquid pack. Safe out the flowline and gas lift supply line. Service the tree. 12. Remove well house. MIRU the well work platform (WWP). Rig up BOPE. Space out the top of the stack to the WWP floor level. Function test and PT the BOPE prior to commencing CT operations if possible. /' 13. Handling equipment should include: · Lifting nubbins for 3-1/2" ST-L · Bowl and slips for 3-1/2" ST-L · Dog collars · Stabbing guides · Power tongs (provided by GBR) · A TIW stab-in valve crossed over to a 3-1/2" ST-L pin looking down. This valve must be in the open position and within easy access on the WWP floor at all times. · Slings, shackles, etc. (Slings to be inspected and certified). 14. Prepare the scab liner to be set from 1 0,305' (deployment sleeve no-go depth) to 11,280' (assuming a sand top of 11,285'). The total length should be adjusted as necessary to place the shoe 5' above the sand top. Note: Depths referenced above are ELMD from jewelry surveys and perforating records. The well schematic depth reference to the jewelry locations are different. 00 3.500" ID 2.972" LENGTH 1.71 ' 3-112" ST-L Baker "bull nose" drillable float shoe. The float shoe will be drilled out with a 2.8" mill. 3-112" ST-L Baker Drillable Float Collar wi Dual Checks 3-112" ST-L Baker Drillable Landing Collar 3-112" 8.81# ST-L l3Cr tubing and pup joints 3-112" 9.3# Otis X Nipple 3-112" Pup Joint - 8.81# ST-L l3Cr 3-112" Pup Joint - 8.81# ST-L 13Cr 3-112" Baker liner chrome deployment sleeve with: 4" as profile, 3.78" OD fluted no-go and 3.5" STL pin. Note: The deployment sleeve will arrive on location with the liner running tool(CTLRT), hydraulic disconnect (1-5/16" ball), and the lower half of the swivel latched in. The CTLRTwill have a 5/8" shearable ball seat with catcher sub and a wiper plug for 3.5" liner. 3.500" 3.500" 3.500" 3.500" 3.500" 3.500" 3.700" 2.972" 2.972" 2.992" 2.813" 2.992" 2.992" 3.000" 1.05' 1.05' -954' 1.06' 9.90' 3.90' 5.78' · Pre-load the 3-1/2" pipe in the pipe rack prior to commencing CT operations. Tally and number the joints. MU liner lifting nubbins with 24" pipe wrench and back-up. · Note all 00, ID and lengths on the tubing tally. · Ensure the BHA has no square shoulders "looking down" or "looking up" in the event that has to be pulled back OOH. · Rabbit all of the BHA components with a 2.8" drift. 10/2/2006 5 . . 15. MIRU 2.375" CT. Conduct safety meeting and review risk assessment. 16. MU dart catcher. Pig the CT with a cement wiper dart in order to verify that it won't hang up and to get a precise measurement of the coil volume. Compare all flowmeters. Recover and check the condition of the dart. 17. MU BHA consisting of a ctc, check and 3" nozzle. RIH tag cement top and pull up to -10,350' MD. 18. Bullhead kill with 200 bbls 2% KCL followed by 400 bbls of diesel (1.5 tubing volumes) at maximum rate. Pump 20 bbl2% KCI down coil at 1 BPM. This should lower BHP (to pressure similar to cementing pressures) and provide for expansion of any gas that is trapped behind the tailpipe and under the packer. This is important because expansion of trapped gas during cementing operations (see step 34) will interfere with our ability to monitor returns. RIH to 10,280' and lay in 20 bbls of 150,000 LSRV flo-pro (-8.7 ppg) 1: 1 while taking returns. Displace flo-pro with KCI. Watch for perf lock up. Lock up is desired because it will help to ensure the cement top is brought above the leaking squeeze perf. Do not exceed 1200 psi WHP (frac pressure). POH to kill well. Pump diesel (30 bbl) down backside to make up for coil displacement. Pump additional diesel as necessary if the well is on a screaming vacuum. 19. MU CTC, x-over and the upper half of the Baker swivel. Pull test and pressure test same. 20. RU GBR casing crew. Prior to commencing jointed pipe operations conduct a drill for closing in the well and stabbing the TIW valve. Ensure personnel assignments are well understood. Conduct a thorough review of crane operations. (Refer to the attached risk assessment for patch deployment). Note: If the well starts to flow while running the tubing, then close the slips and annular preventer. Stab the TIW valve and re-kill the well. 21. Check the well and verify it's still dead. 22. MU the scab liner as described in step #14 and reference Attachment A for schematic. Use stabbing guides. Use Bakerlock on the float equipment, bottom 6 joints of tubing, and the deployment sleeve (please verify that it's compatible with chrome connections). Fill the liner with diesel while running it. Use a dog collar on every joint of liner and any assembly that does not have a slip recess. Special handling is required for chrome. Refer to ADW RP for Handling and Running 13 Chrome. Note the recommended thread compound for 13Cr is "Jet Lube Seal Guard" from Unique. The RP is outdated for the thread compound specification. 101212006 6 . Field make-up torques for ST-L connections are typically higher than the "book value" given by the manufacturer. Field torque values may vary with block alignment, ambient temperature and tong calibrations. A simple procedure to achieve good ST-L connection make up is as follows: 3-1/2" ST-L: a. Make up ST-L connection with 48" hand wrenches to shoulder "contact". (Contact means just enough make up that a .001 or .002 feeler gauge cannot be inserted, but no tighter). b. Scribe a vertical line across the connection with a medium tip magic marker (1/8"). c. Use hydraulic tongs and go to book value of make up torque. Observe the amount of make up indicated by movement of the marker line. You will probably not see any movement with only the book value of torque applied. d. Increase torque until 1 0 to 20 degrees of rotation is observed at the marker line. This will be the proper make up torque for your tongs. 30 degree of rotation from "contact" will over torque the joint. Less than 10 degrees movement will be under torqued. e. Inspect box to confirm no swelling. If swelling is observed lay the joints down and try again with slightly less rotation. f Repeat two to three times to confirm repeatable torque numbers. g. Use field determined torque value for the remainder of liner job. The recommended book values (ft-lbs) are: · 2-3/8",4.7# ST-L · 2-7/8", 6.5# ST-L · 3-1I2",9.3#ST-L 500 min 800 min 1400 min 700 max 1000 max 1800 max 23. RIH with scab liner, and running tool assembly on 2.375" coil workstring. 24. Displace diesel (or MeOH) from the coil in order to avoid mixing with Flo-Pro. Pump two coil volumes of KCI at maximum rate in order to warm the coil prior to engaging. MU the swivel and pull test the CTLRT as per Baker recommendations. 25. RIH at 100 fpm, circulating filtered KCI at minimum rate. Slow across all jewelry. Hold positive WHP and take returns if possible. 26. Lightly tag the XN at 10,305' ELMD. Verify up and down weights prior to releasing from the liner. 27. Pull to the ball drop position. Drop the ball and displace with KCI as directed. Tag the XN and pull up until full string weight is observed (i.e. no stack out). Slow the pump rate prior to seating the ball. Pressure to 2000 psi to release the liner running tool. PU the CT and note string weight to verify the running tool has released. DO NOT PULL UP MORE THAN 4'. If pull up more than 4' running tool/wiper plug assembly will pull out of polished bore. Stack lOK# down and pressure up to 2888 psi to shear out ball seat. 28. Pump 120 bbls of filtered KCI at max rate and monitor the returns. 3 times the 7" liner volume over the perforated interval. This volume will ensure excess Flo- Pro is swept from the areas we will be cementing and avoid cement contamination. 10/2/2006 7 · , 29. RU cementers and mix 8.5 bbls pumpable of Class G latex cement (LARC) as per Attachment B. Note that a "squeeze slurry" fluid loss is recommended in order to build additional filter cake in the perf tunnels. The calculated cement top is approximately 10,950. Cement top will still be 110+ ft. above leak squeeze perfs if there is 25% loss to formation.. Place a field mix sample of cement in UCA at 170°F. Cement QC should include fluid loss, slurry density, slurry temperature, slurry rheology, and filter cake thickness and quality. Compare to design parameters. 30. Pump 8.5 bbls ofLARC (Attachment B), staging off the micro-motion meter and measuring out of the displacement tank. Load the CT wiper dart (Pee Wee) after 8.5 bbls of cement are pumped into the coil and launch the dart. Confirm that the Pee Wee dart has launched. Flush any cement remaining out of the surface lines. Continue displacing the cement at maximum rate with KCI. 31. Note when cement reaches the liner shoe. Closely monitor returns to track the TOC behind the liner. With no cement lost behind pipe the TOC should be -10,850' . A worst case maximum of25% lost to the formation will leave the cement top at -11,030'. 32. Slow the displacement as per Baker recommendations to latch the Pee Wee dart in the liner wiper plug. After latch up, continue to pressure to shear the liner wiper plug at -2972 psi. Note: If latch up is not seen, stop displacement at no more than the total combined displacement (coil + liner) calculated to the liner landing collar. Resume maximum displacement rate even if latch up is not noted. 33. After latching and shearing the dart, resume displacement at maximum rate possible. Adjust the displacement volume to the float collar once latch up and release is noted. Slow pumps to 0.5 BPM no more than 1 bbl before the planned plug bump. If the plug does not bump. do not overdisplace. 34. The liner wiper plug will latch in the Baker landing collar and provide a two-way check. Bump the plug to -1000 psi. Bleed off CT pressure to confirm that floats are holding. Trap -500 psi on the CT. 35. Monitor pressures after pumps have shutdown to confirm that the float checks are holding. 36. Pull out of the polished bore in the deployment sleeve. 37. Circulate at the liner top to clear any excess cement. (The total scab liner annulus volume is 24 bbls, so it's unlikely that any cement will be displaced above the deployment sleeve). Monitor the return rate and verify 1: 1 returns. POOH at 80% while pumping at maximum rate. Note if any cement returns are seen at surface. LD the CTLRT BHA. 10/2/2006 8 · 38. Freeze protect the well, taking care to leave the well liquid packed and overbalanced 500 - 1000 psi. RDMO. 10/2/2006 9 . . 39. WOC for at least 24 hours. Prior to pressure testing confirm approximately 2000 psi compressive strength form the UCA. Pressure test the liner/lap to 2000 psi. Report any leakoff. If the pressure test fails a separate program will be prepared for a liner lap squeeze or liner top packer. 40. RU 1.75" CT and MU MHA, 2-1/8" motor and 2.8" mill. Confirm the burst pressure on the rupture disk and confirm that mag particle inspections are current on the BHA. RIH. Be alert to cement stringers in the liner. Dress off same. Mill out the shoe track with slick water and Hi- Vis sweeps. Back ream as necessary to dress of the shoe. Please note the following factors can contribute to train wrecks while milling cement plugs. o Bit design. An aggressive bit can lead to large cuttings. o High ROP. High ROP can result in larger cuttings and/or poor hole cleaning. North Sea CT operations have recommended a maximum ROP of 25 feet/hour. o Poor hole cleaning. Pump frequent hi-vis sweeps combined with short trips to agitate and suspend the cuttings. Partkularly important due to 7" tubing. o Time of day. Problems often occur at -2:00 am. o Static fluids and coil. Avoid shutting down the pumps and avoid stationary pipe while on bottom. 41. Continue drilling through the cement and sand/cement interface. Monitor the returns and employee high viscosity sweeps as necessary to lift cuttings. 42. Once through the sand/cement interface, drop ball and increase pump rate to mitigate cutting falling back and sticking pipe. POOH. 43. RIH with nozzle for nitrogenized cleanout. Take small bites and chase up the hole. Clean out some rat hole below the bottom perf (i.e. 11,330') if possible. Rat hole provides contingency for dropping guns. Theoretical swell on the Omega guns leaves a 0.03" tolerance for pulling back through the 3.5" X Nipple. 44. Reperf 11,293' - 11,310' per attached perf form. 45. N2 lift to POP. RDMO. 46. Return the well to production and test. 101212006 10 ATTACHMENT A Well: 3,700" 3.000" TBD ~t500" 2,972" 3.500" 2,972" 3.700" 2,812" 3.500" 2.972" 3.500" 1.810" 3.500" 2J372" 2,912" . . BAKER THR.U-TUBING 5.18' I 3.90' .. t 9..90' 1.06' ,. Date: Co. Man: .~ I:>eployment Sle$vè 3.700" X 3.00" 4" "as" Profi!o wlfluted N·o-Go Pup Joint 3 1/2:" $1t.. Pu.p Joint 3112" STt.. OTIS"X" 2...81'" Mln 10 3 112" SIt.. liner SOT Landiiìg Collar 3 1/2." STl aOT FI,oat Collar 3 112" STL 11301' 1.11' Taperød Float Shoe 31/2" Son fi 1"1!"'~P~g il fI1Sí'UI" LiltctI 1.50" 3,.50" 1,50" 3.50"'- 1.5 Coil Connectør x..ovør Swivel 3.6 125" HydrauUc Diis¢on!'IiØct 1 5116" EliaU Seat 1,50" CTL.RT 2000 PSI Réil!aSé 4,00' 51S" BaU$eat 2'888 PSI Rèll'Hl1té liner Wiper Plug 2972 PSI Retease Tho equipment JengU¡s.. QQ's. ;#1<1 IV'$¡ M this. pflgë are fOf linéf Ùllly PutpØ$þ, Qime-n$.lonal drawing for Saker aHA Is Qn ,ffle.. The equipment 1$ s'ét up to u$ß' tllé fol/Qwlngopør<tìt<m,ðl pre$1$ure$: 1. CTLRT RÐJÐ'ltSÐ Z()(J()psl 2. 8<íJ1 8Ð:tt shear Out 2888P$1 3, S:hø.,r LlnÐ-f WipeI' Plug 297~P$J 4.90' Tø Pttll Smtf fl'Qm f>ep Sleé\''$ 7.20' 1'0 Pull LWP f'l'Qm f>ep SJe.(!v'$ 10/2/2006 Il . . ATTACHMENT B BP CEMENT DESIGN FORM Date: Julv 27. 2006 Cement Type BHST BHCT Pump able Volume: LARC 199°F 170°F 8.5 bbls Well:..J:11.. Submitted By: Chris Zamora 4-5 hours 0.80 inches 0.75-1.00 inches 65 cc 50-80 cc incl. 2 hr surface Ius 2-3 hrs Firm cake Firm cake API, cd30 min. at BHCT API, cd30 min at BHCT The slurrv should have no free water. MINUTES TEMPERA TURE/PRESSURE 0-120 90°F @ Atmospheric Pressure 120-150 Increase pressure to 4000 psi. Increase temperature to 170°F. 150-180 Gradually increase pressure to 5000 psi. 180-210 Hold Temp & Press @ 170°F & 5000 psi. 21O-End of Test Decrease pressure to 4000 psi and hold 4000 through- out the remainder of the test. Increase temp by 15°/hr to a BHST of 199°F (if reached) until End of Test. Results: Please submit results to Company Man. Date of Test: Service Co. Engineer: Lab Filter cake (thickness, in): Description: Soft, Med., Firm?: Lab API Fluid Loss: Thickening Time (hrs): Slurry Density(1b/gal): 101212006 12 . ATTACHMENT C GAS ENTRY LOG . 101212006 ---,..,.". w~u -""""'<..,.,..---- ,,,,,,,,,,,,,,.,.,..,,.,,,,,,,.,-.- _.............. 13 . . ATTACHMENT D fiLE 'COPY ScblulBlIergl' RESERVOIR SATURATION SIGMA MODE SEPTEMBER 2001 J tl z () ~ ~ F r:> "...- u; ioD tr tu *'5 0 êJ "".,J ..J Z n fj ([I :..:' "", t;¡ ';0) W tr /in fh u.. (ú c ,;..... ç <) 1t 8: T I: :t;:, it $ 65f.1 StilL .& atW Vie, 1>.1 SURfACE EhS"'¡ i(.E G.L ::r= 1:~;~;;n~~rtCn1 Dðwm Log M(~-:as¡Jtø,::j f:-föe MS;L fU<.P, £ "" (:.11 {/8'( t"1 .abO'i,'B Perm. Datul!''j ;r';)fF, RKß þ/"í 80f 0; N<:>. ~'()-();2B.. Z)4P 7 >I);) t:Lc'-rtQ-N ~: lOì.?iNS'i-.¡:r;¡ nN F;l\~K.;E 13, "1C,;Q.;:·n Typ~?. I . "11;:¡77()f~, j j 1 {,:~:>:' '. FINAL, ~~¥nity D~fl5tty Fluid l€"'BI DL ~1¡::c Fr9r-' Tq F~-c,rn In ~'9lbrn.;tt lA)(ì IO~:J it Weigh! G,,,rJn 11 1'95 ~ 1irrt{ ~~ OC . Lxx;ø:HtiD £:1%.\' 10/2/2006 14 101212006 . . 15 . . ~ PERFORATING PROCEDURE Ver 1.2, Rev 10/21/01 Well: Date: J-13 .............................................. 7/27/06 API #: 50-029-20497-00 .............................................. Prod Engr g~.~~~.?~!!.'.?~~......... Office Ph: Home Ph: CelUPager: 907-564-4138 ........................................................ 907-336-1974 ...............h....................................... 907-952-6699 ................................. Cost Est: CC or AFE: ...............~.?~~!~~~............... PBJPDWL13-N .............................................. ......................................................., WBL Entries ........~g~.................!y.P..~...........~?~~.!?~~~~p.~~?~........................................................................................................ L.....~!.~.......L...........~.............lº.~I.~!!b..I2~!!.'.~y..~.~~..........................................................................................h) 1.:::::::~::~:::::::L::::::::::~:::::::::::::l::::~::~::::::':~::~::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::! I Attachment: Heference log with proposed perfs annotated, 5'/100' scale Reference Log Tie in Log Log: BHCS/GR RST Date: '9i2'åï1"9SÖ'" ·"9i6i2·6ö(h Company: :!¥.~º::::::::::::: :::::::~ür::::: Depths (from-to) Depths (from-to) Feet .....~.:L.?~~.'..... - ...J.!.,.~W.. ...~.1.:g~.~:... ...J~.,.~~.º:... 17 Well Obiectives and Perforatina Notes: Heperf 17' Add 0 to the tie-in lo~iiëiï)ë·öï'¡·"''''''''''h.''' depth with the reference log. feet SPF 6 Orient. Random .......................... Phasing 60° .·.......·........u....u.......... Zone AdlRe/lperf ...?ç.............B~.P.~r!........... ....~..................' ..................... ..................... ...................... .......................... .................................... ............................................, .......................' ..................... ..................... ...................... .......................... .................................... ............................................. .......................' ..................... ..................... ...................... .......................... .................................... ............................................, ........................ ..................... ..................... ...................... .......................... .................................... ............................................. ........................ ..................... ..................... ...................... .......................... .................................... ............................................. ........................ ..................... ..................... ...................... .......................... .................................... ............................................. Requested Gun Size: 2-m" HSO ...................... Charge: .?~º~.E.'!..Q.0:.~fI~, HMX Is Drawdown Necessary/Desired/Unnecessary During Perforating Preferred Amount of Drawdown/Suggestions to Achieve Drawdown .\J.I).I).~.~.~~.~.':I.~........................................................................................................ ..........................................................................u................................................... Last Tag: ..........))!~!?~. ft MD on 4/30/2006 Est Res. Pres. @ ...................... ........1.1...).22....... MD is 3181 psi .....................~.............. Perforation Summary API#: 50-029-20497-00 Prod Engr: Summary Dist Town: ..................... Anch Prod Engr P.D. Center Well: Date: J-13 ><...~~''^'~~''''''"." ><~- ......................................... PBTD General Comments: Balance O/B/U O/B/U O/B/U O/B/U O/B/U O/B/U O/B/U Depths Based on Ref Log Gun Dia. Orient. SPF Phasing Zone Adperf/Reperf nH~ """".... ~.. "-nn'" eo""".....o, 831303 Detail Code: 335-070-770 ......······......·..···O¡:¡LG"ïCOMP'LETlON 1 PERF ...................... ..................................................... ............................ 10/2/2006 16 . . . ~ . Hazid will be finalized by Wells Group on Slope Risk Assessment Liner Deployment / Event Consequence Risk Remediation Slips, trips and falls Personal injury High Watch out for surface lines. Use hand rails, watch footing on steps. If done in winter months, sand the location prior to rig up, use nut plug or sand after rig up to ensure steps and walkways are properly covered. If the WWP has been set on herculìte, lay plywood on walkways if possible to reduce the exposed slick surface. Weather conditions Personal injury Low Use face masks, buddy system, and breaks to warm up. Work platform will be kept warm by heating system. Air heaters strateqicallv placed if required. BOP Testing Spills, Low WWP personnel to assist and be miscommunication familiar with BOP testing. Good radio communication is a must. Personnel injury - using Ensure that test joints are proper test subs for PT. size and have a large OD bottom sub to keep the test joint from shooting out the stack under pressure. Well Control (flow) Loss of control Low Well is loaded with a fiscous pill over the perfs and kìll weight fluid. Fluid level will be visually monitored, tbg filled at regular intervals. BOP stack is dressed for 3-1/2" and 2-3/8" pipe plus two sets of blind shears. In addition there will be an annular (bag) preventor. The BOP control panel will be operable from the floor with a remote panel in the coil operator cab. Ensure that well control falls within Drilling and Wells Policy, or proper dispensations have been prepared. Exposure of personnel Personal injury High Making connections will be done on platform to injury by personnel familiar with while picking up pipe. operation using power tongs and back up tongs. Wire/cable slings need to be certified before being used for tongs. If top of BOPs above platform floor, personnel will be using tongs while working on scaffolding which increases the risk of injury. Liner wìll be picked up in singles from the tubing fingers. The workinq floor will be cleared 10/2/2006 17 . . , of non-essential oersonnel, Open wellbore while Spill, loss of control Medium Same as above layinq down liner Liner slipping downhole Possible injury, fishing Medium Use collar safety clamp after being landed in job/loss of well slips Elevators improperly Possibly drop liner as Low Verify elevators are correctly sized sized for liner above for pipe. Nubbins have been checked and verified. Use slip tvpe elevators. Open work floor over Injury to personnel by Low Floor has opening that allows wellhead falling through opening lubricator to penetrate above floor. Insure that slip bowl will set in top of lubricator or BOP. Risk increases if BOP's above floor. Length of liner joints are Can't fully pick up with Medium Trolley back and place injector on greater than normal perf crane below coil T-Bar. deck before pulling liner. Quns. Spill from liner while Fluid from inside or High Tray underneath tubing rack area. pulling/standing back outside of pipe drips onto Spill dikes around wellhead and pipe ground while cellar. líftinq/movinq liner Setting slips around liner Personnel injury, Medium Experienced personnel on tongs. possibly drop liner Use safety collar and properly sized handlina tools. Injector over work area Personnel injury, Low Minimize number of personnel in equipment damage area. Discuss job procedure in detail before initiating work to minimize exposure time. Crane Lifts (Picking up Personnel injury, Medium Clear area of non-essential liner) equipment damage personnel. Use tag lines if possible. Do not get below suspended loads. Use spotter to assist crane operator. " 101212006 18 . . J-13 Proposed Scab Liner 13-3/8" CSG, 72#, L-80, JD= 12.347" I 2tJ77'-/7" sssv I.ANIJING N1P I 2603' H 9-5/8" DV A<R I . Minimum ID = 3.725" @ 10300' 4-1/2" oris XN NIPPLE 7" TBG, 26#, L-80, .0383 bpf, ID ';6.276" I TOP OF 4-1/2" LNR I 10269' 4-1/2" OTIS X NIP, ID = 3.813" 14-1/2" TBG, 12.6#, L-80, ..01S2 bpf, 10 = 3.958" I 10333' 10300' -14-1/2" OTIS XN NIP, Ð = 3.725" I 10333' -14-1/2" TUBING TAIL I 10340' H EJ..MDTTLOGGID101(j6/91 9-5/8" eSG, 47#, N-80, ID = 8.681" I 10780' 3-1/8" 3-1/8" 3-1/8" 3-1/8" 3-3/8" PERFORA TION SUMMARY REF LOG: SHeS ON 09/28/80 ANGLEATTOPPERF: 34@ 11146' Note: Refer to Production DB for historical perf data SPF INTERVAL Opn/S z DATE 4 11146 - 11168 S 03/26/81 4 11178 - 11198 S 03/26/81 4 11208 - 11238 S 05/02/81 4 11248-11278 S 05/02/81 4 11293-11310 0 01116/89 3112" STllNR, 93#. í 3Cr-SO 7" lNR, 29#, L-80, .0371 bpf, ID= 6.184" DA TE REV BY COMMENTS PRUDHOE BA Y UNIT WELL: J-13 PERMIT No: 'í 800830 API No: 50-029-20497-00 SEC9, T11N, R13E EIP EXpl!)tatlon (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well MPC-41 MPG-05 MPL-33 P-06A OS 02-25 u.~. 09-10 B-20 Y-25 PSI-10 P-26 02-14A F-12 04-35 t 5-09A 15·09A 5·09A " J-13 D.S. 09-29 BP Exploration (Alaska) Inc, Petrotechnical Data Center LR2-1 900 E, Benson Blvd, Anchorage, Alaska 99508 Date Delivered: Job# 10889195 10715440 11058514 11132061 10987525 11058237 10980591 10928605 10715447 10928634 11075901 NA 10889172 10889183 NA 10919942 10877750 10980596 ~NED OCT 3 12005 Log Description SBH SURVEY MPSP INJECTION PROFILE INJECTION PROFILE LDL INJECTION PROFILE INJECTION PROFILE t>o--~\,\~~ ~ LDL MEM PPROF W/DEFT MPSP IPROF & WARMABACK MEM PPROF W/DEFT MEM PPROF & IPROF LDL SBHP SURVEY OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE LDL PPROF WIDEFT c O&-~ÌJ- Date 12/24/04 11/09/04 06/03/05 10/12/05 06/24/05 08/16/05 08/05/05 11/20/04 01/01/05 06/02/05 07/09/05 06/03/05 10/10/04 11/04/04 02/02/05 02/13/05 06/29/04 08/10/05 NO. 3503 10/18/05 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Color CD ----- -~ Alaska Data & Consulting Services 2525 Gambell Street. Suite 40 Anchorage, AK 99503- 8 ATTN: Beth Received by: r - I' ð~i\rd, ~.~:~--.:A.'i.:tifi;-_§'>_.~.' "-~O r'fJU'-~ 7':~~~-~~~!r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION EIVED 1.0perationsPerlormed: REPORT OF SUNDRY WELL OPERATIONSOCT 2 $ 2004 AbandonD RepairWellŒ) PluÇJ PerforationsD Stimulate D III. ¡ Otherij . .KlaS¡Œ ~U . Ja......~.",..... .. Commissior Alter Casing 0 Pull TubingO Perforate New Pool 0 WalverD Time Extension " m:;hor~ge Change Approved ProgramD Operation Shutdown 0 Perforate 0 Re-enter Suspended Well 0 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 4. Current Well Class: Development [&] 69.10 8. Property Designation: ADL-0028281 11. Present Well Condition Summary: Stratigraphic 0 9. Well Name and Number: J-13 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Exploratory 0 Service 0 5. Permit to Drill Number: 180-0830 6. API Number 50-029-20497-00-00 Total Depth measured 11800 feet true vertical 9465.2 feet Effective Depth measured 11749 feet true vertical 9420.4 feet Plugs (measured) Junk (measured) None 11646,11624 Casing Conductor Liner Production Surface Length 80 1530 10754 2643 Size 20" 91.5# H-40 7" 29# L-80 9-5/8" 47# N-80 13-3/8" 72# L-80 MD TVD 28 108 28.0 108.0 10265 - 11795 8220.2 - 9460.8 26 - 10780 26.0 - 8607.7 27 - 2670 27.0 - 2653.1 Burst 1490 8160 6870 4930 Collapse 470 7020 4760 2670 Perforation deDth: Measured depth: 11293 -11310 True vertical depth: 9025.95 - 9040.38 Tubing ( size, grade, and measured depth): 7" 26# IJ-45 4-1/2" 12.6# L-80 @ 24 @ 10226 10226SCANNED NOV () 3 2004 10333 Packers & SSSV (type & measured depth): 7" Guiberson Polar Packer 9-5/8" DV Packer @ 10226 @ 2603 12. Stimulation or cement squeeze summary: Intervals treated (measured): 10140 -10282 Treatment descriptions including volumes used and final pressure: 8.5 Bbls 15.8 ppg Class G Cement @ 180 psig Representative Dailv Averaqe Production or Injection Data Gas-Mef Water-Bbl Casing Pressure 11 1392 150 17.1 2568 600 13 Prior to well operation: Subsequent to operation: Oil-Bbl 717 1224 Tubing Pressure 1142 205 14. Attachments: Copies of Logs and Surveys run - Daily Report of Well Operations - ! 15. Well Class after proposed work: Exploratory D 16. Well Status after proposed work: Oil[!] GasD DevelopmentŒ] Service D Signature Garry Catron Garry Catron }:fa! c~ WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: NIA 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Title Production Technical Assistant Phone 564-4657 Date 10/18/04 (") 1 ~ <..J \G\~JAL ,BfL OCT 2 7 20D4 Form 10-404 Revised 4/2004 \. J-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 09/12/04 ATTEMPTED TO LOAD TUBING WITH 2°/0 KCL AND CRUDE FOR SETTING PLUG AND CEMENT SQZ. TUBING PRESSURED UP TO 3000 PSI SOON AFTER PUMPING AT 2.0 BPM AND IA PRESSURE FOLLOWED. ONLY PUT AWAY 60 BBLS OF KCL AND THEN FREEZE PROTECTED. PUMP RATES DOWN TUBING AT 2500 PSI AT 0.5BPM WITH IA PRESSURE AT 2950 PSI WHILE FREEZE PROTECTING.. . 09/21/04 SET HES FASDRILL PLUG AT 102581, SHOT TUBING PUNCH FROM 101931-101981 09/30104 TIIIO = 0+10+/170, TEMP = SI. IA FL PRE-MITIA. IA FL NEAR SURFACE. 10102/04 T/I/O=010/160 JOB IN PROGRESS, CONTINUED TO 10-3-04 WRS 10103/04 JOB CONTINUED FROM 10-2-04 WRS. T/I/O=010/160 (MIT IA 3000 PSI) PASS. LOADED IA WITH 7 BBLS CRUDE, 1 ST MIT PASSED WITH A LOSS OF 120 PSI 1 ST 15 MIN. AND A LOSS OF 60 PSI 2ND 15 MIN. ßLED IA BACK TO 0, WELL W AS TAGGED AND DSO NOTIFIED. FWP=010/160 10104/04 CTU#5, MILL CMT; MIRU. RIH WIWFD 2-7/8" MOTOR AND 6" REEVES UNDERREAMER. MILL HARD CEMENT FROM 101161 TO 102151 CTMD (XO TO 41/21l POOH CIRCULATING BOTTOMS UP. CONT ON WSR 10105/04... 10105/04 CTU #5, MILL CMT; CONT FROM WSR 10104/04... POOH CIRCULATING BOTTOMS UP. PERFORM MITIA TO 3000 PSIG - FAILED DUE TO THERMAL COOLING. RBIH WITH 27/8" PDM WI 3.60" 5-BLADE JUNK MILL. PERFORM MIT-T TO 2500 PSIG - PASSED. MILL CEMENT FROM 102101 TO 102391 CTMD. MILL HES FASDRILL PLUG AND PUSH TO 10258 CTMD. APPEAR TO BE SPINNING ON TOP OF PLUG. PUMP FLO-PRO PILL AND CHASE OUT OF HOLE. BREAK DOWN TOOLS AND SET LUBRICATOR DOWN ON BACK DECK. 10106/04 CTU#5: MILL CEMENT/N2 LIFT. «<CONTINUED FROM 10/5/04»> STAND BY FOR NORTHSTAR SAFETY STAND DOWN. 10/07/04 CTU#5 MILL: END WEATHER STANDBY. RIH WI 3.625" JUNK MILL, MTR, UID JARS. LIGHT TAG @ 10217'. VERY LITTLE MOTOR WORK, ONE STALL, THEN CLEANLY PASS THROUGH TT. RIH DRY TO 116001. PUMP 20 BBL FLOPRO SWEEP, CHASE OUT @ 80%. MUIRIH WI 3" JSN, PUMPING N2 @ 600 SCFIM, TAKING RETURNS TO LP. BEGIN LIFTING FROM 30001. CONTINUED ON 10108/04 WSR. 10/07/04 CTU#5 MILL: END WEATHER STANDBY. RIH WI 3.625" JUNK MILL, MTR, UID JARS. LIGHT TAG @ 102171. VERY LITTLE MOTOR WORK, ONE STALL, THEN CLEANLY PASS THROUGH TT. RIH DRY TO 116001. PUMP 20 BBL FLOPR 10108/04 CONTINUED FROM 10107/04 WSR. N2 LIFT @ 600 SCFIM FROM 30001, 4400',5700', 6400',7100',78001. REFILL N2. N2 LIFT @ 1100 SCFIM FROM 76001,8200.,87001. WELL APPEARS TO BE KICKING OFF. POOH. COMPLETE BOP TEST. RDMO. WELL LEFT FLOWING. BBLS 10 60 1300 3 368 90 60 8.5 FLUIDS PUMPED Methanal 20/0 KCL Crude Diesel 60/40 Methanal Fresh Water Inhibited water 1 % KCL Class G 15.8 ppg Cement Page 1 2179 XS 1% KCL 208 FloPro 765 Xtra Slick 5051.5 TOTAL J-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS Page 2 ¡"TREE'=" 6" CAMERON WELLHEAD = FMC ÁCTüÁfÔR; . .. 6,iÓfiá «««"u,u~..n<"« u"",. '."'U"""'''' . . """"" u ,..n«"""",." KB. ELEV = 69.07' BF~Eï.Ði .;,;.m "41:'87; ì{op,;",...,..m.w"""w,..m,.. '2300; Max Angle = 61 @ 8600' 5atum"¡v15,,;,w..~"m""1>1T515;' Datüi1ïwÖ;;;aäö(j' ss J-13 SAFETY NOTES: 8 . 2077' l-i 7" SSSV LANDING NIP I r 13-3/8" CSG, 72#, L-80, D= 12.347" H 2670' J Minimum ID = 3.725" @ 10300' 4-1/2" OTIS XN NIPPLE I 7" TBG, 26#, L-80, .0383 bpf, ID = 6.276" l-i I TOP OF 4-1/2" LNR l-i I TOP OF 7" LNR l-i 10226' I 10226' I 10265' I ! 14-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" l-i 10333' I 1-1 2603' l-i 9-5/8" DV PKR I r 1 1 10080' l-i TOC (PKR SQZ 09/28/04) I 110193'-10198' I-iTBG PUNCH (09/21/04) I 1 10203' l-i TOP OF PBR I I 10226' l-i 9-5/8" x 7" GUIB. POLAR PKR I I 10226' l-i 7" x 4-1/2" XO I \ I .. I j t 1 10269' I I 1 1-i4-1/2" OTIS X NIP, ID = 3.813" I 1-i4-1/2" OTIS XN NIP, ID = 3.725" I 1-i4-1/2" TUBING TAIL I l-i ELMD TT LOGGED 10/06/91 I 10300' 10333' 10340' 9-5/8" CSG, 47#, N-80, ID = 8.681" l-i 10780' ~ ÆRFORA TION SUMMARY REF LOG: BHCS ON 09/28/80 ANGLE AT TOP PERF: 33 @ 11146' Note: Refer to Production DB for historical perf data SIZ E SPF INTERV A L Opn/Sqz DA TE 3-1/8" 4 11146 - 11168 S 03/26/81 3-1/8" 4 11178-11198 S 03/26/81 3~1/8" 4 11208-11238 S 05/02/81 3-1/8" 4 11248-11278 S 05/02/81 3-3/8" 4 11293 - 11310 0 01/16/89 I PSTD l-i 11749' I 7"LNR,29#,L-80,.0371bpf,ID=6.184" l-i 11795' DATE 09/80 07/18/01 11/01/01 08/04/04 10/16/04 REV BY DA TE REV BY COMMENTS PRUDHOE BAY UNIT WELL: J-13 ÆRMIT No: 1800830 API No: 50-029-20497-00 SEC9, T11N, R13E COMMENTS ORIGINAL COM PLETION RNlTP CORRECTIONS WBITP SURF LOC CORRECTION MDC/TLP IBP, FISH NECK DBMTLH FASDRILL PLUGITBG PUNCH .,. I 11047' l-i MARKER JOINT I ~ 11600' CTM H HES FASDRILL MILLBJ/PUSHED TO 8TM (10/07/04) 1 -, 1 11646' H 27' PERF GUN - 03/26/811 ~ BP Exploration (Alaska) LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 21 November 1994 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1DIFL/GR FINAL BL+RF 1 BHC/GR FINAL BL+RF 1 CN/GR FINAL BL+RF 1 SSTVD FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 1187.03 1341.01 6010.06 6063.01 6299.03 6301.00 Please sign and return to: At~s Wireline Ser~ 5600~.Street / ~ Suite 2~kl / ~ Received by: , ~o ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 14 July 1994 RE: Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL J-13 (22-03-11-13) N-01 (13-08-11-13) E-!3 (01-11-13) N-06 DESCRIPTION cN/GR L~WG TAPE+L~ST /~CN/~R L~W~ TAP~+L~ST · ~c~/~R LDW~ TAP~+L~ST /~C~/GR ~D~ TAP~+L~ST / CN/GR LDWG TAPE+LIST ECC No. Run ~ 1 1187.02 Run # 1 5650.07 Run ~ 1 4060.03 Run # 1 5955.01 Run # 1 6224.00 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Please s i~n and return to: Petrotechnical Data Center BP Exploration (Alaska) Inc 900 East Benson Boulevard Anchorage, Alaska 99508 Received by Date Date: ~J. ease sign and return to: Petrotechnical Data ~ tar BP Exploration (Alaska/ 900 East Benson Boulevard Anchorage, Alaska 99~08 Received by Dste ALAS '~ N COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 7 July 1994 RE: Transmittal of Data Sent by: ATLAS WIRELINE Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. 5-5 \ z-27 ,,~ PDK/GR FINAL BL 1 PDK/GR FINAL RF Run # 1 4269.01 Run # 1 ~D--%~ x-07 (43-08-10-:4) o 1/~LS FINAL BL ! PLS FINAL RF lzPLS/GLS FINAL BL PLS/GLS FINAL RF Run # 1 Run # 1 Run # 1 Run # 1 4046.04 PDK/GR FINAL BL PDK/GR FIN~ RF Run # 1 Run # ! 4!46.01 /~ SBT/GR FINAL BL 1 SBT/GR FINAL RF Run # 1 Run # 1 6229.00 /~ CN/GR FINAL BL 1 CN/GR FINAL RF Run # 1 Run # 1 1187.O2 %%-~%J~. Z-14 (44-18-11-13) 1 CN/GR FINAL BL CN/GR FINAL RF Run # 1 Run # 1 6012.O1 ~-COLLAR LOG FINAL BL COLLAR LOG FINAL RF Run # 1 Run # 1 1991.02 Please sign and return to: Atlas Wire!ine Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: BP EXPtORATION BP ~XDIOratmn (Alasl<a) Inc. 900 Eas~ Benson Boulevard PO. Box 196612 Anchorage. Alaska 99519-6612 (~37) 561-5111 DATE: 10/24/91 T~ 82948 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 09/22/91 10/05/91 08/22/91 09/25/91 10/01/91 09/25/91 ~fg?-09/ CCL 09/21/91 ~-/~£S-!8~ GAS LIFT SURVEY 08/30/91 ~]-~Y-16/ PROD-F 10/04/91 3,.1~ A-16/ INJ 09/01/91 ~-q~ E-13~-~- PROD-F 09/24/91 ~'~$~S-07/ GAS LIFT SURVEY 09/22/91 TEMP 10/05/91 ~1 LEAK DET 09/29/91 %1 PITS 09/22/91 ~1 LEAK DET 10/04/91 #1 GAS LIFT SURVEY 09/26/91 ~1 LEAK DET 09/27/91 SPINNER 10/02/91 SPINNER 10/03/91 INJ 09/30/91 INJ 10/01/91 INJ 10/07/91 INJ 10/06/91 TEMP 10/07/91 INJ 10/06/91 PITS 09/27/91 INJ 09/28/91 INJ 10/01/91 CCL 10/02/91 LEAK DET 10/03/91 JEWELRY 5 " ~,-~ J-13 ~ GAS ENTRY, JEWELRY 5 " / ~9 W-07 ~ JEWELRY ~ __.___. 5 " 9047.00-10650.00 CAMCO 5 " 13950.00-14512.00 CAMCO 5 " 12101.00-13175.00 CAMCO 5 " 9070.00- 9621.00 CAMCO 5 " 8869.00-10162.00 CAMCO 5 8780.00- 9331.00 CAMCO 5 14200.00-14987.00 CAMCO 5 " 1800.00- 4550.00 CAMCO 2/5" 9000.00- 9405.00 CAMCO 5 " 10470.00-10900.00 CAMCO 5 10900.00-11290.00 CAMCO 5 " 375.00-11191.00 CAMCO 2/5" 8800.00- 9812.00 CAMCO -5 7400.00- 7600.00 CAMCO 5 " 9100.00- 9547.00 CAMCO 5 " 9770.00-10150.00 CAMCO 5 100.00- 8550.00 CAMCO 2 " 170.00-11350.00 CAMCO 2 " 9000.00- 9230.00 CAMCO 5 " 12500.00-13125.00 CAMCO 5 " 9150.00- 9520.00 CAMCO 5 " 9050.00- 9385.00 CAMCO 5 " 9650.00-10078.00 CAMCO 5 " 9050.00- 9400.00 CAMCO 5 " 8300.00- 9116.00 CAMCO 5 " 9100.00- 9430.00 CAMCO 5 " 9450.00- 9734.00 CAMCO 5 " 12000.00-12650.00 CAMCO 5 " 10750.00-11297.00 CAMCO 5 " 9350 00- 9650 08/30/91 ~1 10800.00-ill50.0,~MCO 10/06/91 #1 10/05/91 GAS ENTRY S " S " 900~ -!0143.00 C.~MCO 9300.00- 9800.00 CA/~-CO informataon Control Well Records Adrian J. Martin STATE OF ALASKA ( A~' .(A OIL AND GAS CONSERVATION REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Repair well 5. Type of Well: Development Exploratory S~'~graphic 1. Operations performed: Operation shutdown Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1049' SNL, 803' WEI., SEG. 09, Tl lN, R13E, UPM RE([EIVED At top of productive interval 1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM At effective depth NOV - 6 1990 1361' SNL, 2602' WEL, SEC. 03, T11N, RI3E, UPI Alas!~.0iJ & ~as Cons, .Q~~ At total depth 1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM ' ~lt(~ll~ " 11800feet Plugs (measured) BKB 9464 feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured 11749feet true vertical BKB 9420feet Perforate Other X 6. Datum elevation (DF or KB) KBE. 69.07 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J- 13 (22-03-11-13) 9. Permit number/approval number 8O-83 / 90-619 10. APl number 50- O29-2O497 11. Field/Pool Prudhoe Oil Pool Junk (measured) fill at 11706' MD (01/89) True vertical depth BKB 137 267O 8607 10264-11795 8218-9460 Sqzd: 11146'-11168', 11178'-11198', 11208'-11238', 1'1248'-11278' Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 12 c.y. 137 Surface 2643 13 3/8 3720 c.f. 2670 Intermediate 10753 9 5/8 1665 c.f. 10780 Production -- Liner 1531 7 427c. f. Perforation depth: measured 11293'-11310' true vertical subsea 8957'-8971' Tubing (size, grade, and measured depth) 7"L-80 to 10226'with 4 1/2"tailpipe to 10333' Packers and SSSV (type and measured depth) 9 5/8' Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077' See Attachment 13. Stimulation or cement squeeze summary Intervals treated (measured) 14. Treatment description including volumes used and final pressure Tubing Pressure Rec)resentative Daily Averaae Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 2348 1031 Service Date Prior to well operation 2220 14638 46 Subsequent to operation 4520 7746 540 15. Attachments ~ 16. Status of well classification as: Copies of Logs and Surveys run I Daily RePOrt of Well Operations X Oil X Gas Suspended 17. I hereby.~,,~ '.~y. th.~t the~,~lO~ t~ue and correct to the best of my knowledge. Signed /L,~ ~ [~ ~ Title Supervleer Gravity Drainage -'orm 10-404 Rev 06/15f(88 ~ SUBMIT IN DUPLICATE WELL J-13 (22-03-11-13~ PBU COILED TUBING SQUEEZE OPERATION We perforated the following additional intervals dudng a squeeze on August 18, 1990: 11293'- 11310' MD BKB Jetted across perfs at 2.0 bpm. Reversed cleaned. Injection test at 0.5 bpm at 2500 psi. Reversed in N2 for 1500 psi. Underbalanced (5000' MD) when bled to flowline pressure. Shut in wellhead pressure at 2000 psi. Tested well and put on production. mr:l 0/27/90 BP EXPLORATION BP Exploration (Alasl(a) Inc. 900 East Benson Boulevarcl PO. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :09/04/90 T#:81631 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-29 Completion 08/24/90 #1 9800-10160 Sch 5" J-13 Completion 08123/90 #1 11000-11400 Sch 5" Q-06 Completion 08/24/90 #1 11000-11368 Sch 5" S-19 Prod-F 08/28/90 #1 9500-9957 Sch 5" U-06 Perf 08/28/90 #1 8300-9265 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVC31R ~.~'T-~¥E oF ALASK~ ARCHIVES -S E p - 7 0 1990 ,'Uaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploratton (Alaska} Inc. 900 East Benson Boulevard PO. Box 196612 Ancl3orage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :08/15/90 T#:81493 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-27 INJ 07/27/90 #1 8750-9305 Camco 5" A-30 Pump-ln/Temp/FM 07/29/90 #1 10600-11077 Camco 5" E-10 GR/CCL 07/26/90 #1 11400-11739 Camco 5" J-13 GAS ENTRY 07/27/90 #1 11000-11400 Camco 5" M-23 PROD-F 08/01/90 #1 9350-9760 Camco 5" W-06 LEAK DET 07/31/90 #1 3300-8198 Camco 5" X-15 P ROD-F 07/31/90 #1 9350-9950 Camco 5" Y-16 PITS 07/22/90 #1 8950-9422 Camco 5" Y-16 PROD-F 07/22/90 #1 8900-9422 Camco 5" Y-17 Pump-in/Temp/FM 07/24/90 #1 10100-10430 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RECEIVED 1. Type of Request: 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1049' SNL, 803' WEI., SEC. 09, T11N, R13E, UPM At top of productive interval 1640' SNI., 2915' WEL, SEC. 03, T11N, R13E, UPM At effective depth 1361' SNL, 2602' WEL, SEC. 03, T11N, R13E, UPI At total depth 1338'SNL, 2601'WEL, SEC. 03, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11800 feet true vertical BKB 9464 feet L STATE OF ALASKA A ,.,KA OIL AND GAS CONSERVATION COMMI APPLICATION FOR SUNDRY APPROVAI r , . . "' ~ ~ u ~ !~i ~ LI Abandon ~ Suspend ~ OperaDon Shutdown __ Re-enter suspended well~ Alter caang ~ Repar well~ Plugging __ Time extensmn __ SDmulate Change approved program ~ Pull tubing ~ Vanence ~ Perforate ~ OIh---~ X 5. Type of Well: Development Exploramry Stra§graphmc 6. Datum elevation (DF or KB) KBE = 69.07 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J-13 (22-03-11-13) 9. Permit number 80-83 10. APl number 50- 029-20497 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 11749 feet true vertical BKB 9420 feet Plugs (measured) Casing Length Structural -- Conductor 110 Surface 2643 Intermediate 10753 Production -- Liner 1531 Perforation depth: measured Junk (measured) fill at 11706'MD (01/89) 11293'-11310' Size Cemented Measured depth True vertical depth BKB 20 x 30 12 c.y. 137 137 13 3/8 3720 c.f. 2670 2670 9 5/8 1665 c.f. 10780 8607 true vertical subsea 8957'-8971' 10264-11795 8218-9460 Sqzd: 11146'-11168', 11178'-11198', 11208'-11238', 11248'-11278' 7 427c. f. Tubing (size, grade, and measured depth) 7" L-80 to 10226' with 4 1/2" tailpipe to 10333' Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077' 13. Attachments Description summary of proposal X Detailed operations program ~ BOP s,,~to~~ IVEE 15. Status of well classification as: AUG o 919 0 Suspend, ~ ~ ~asl<a Oil & Gas Cons, 14. Estimated date for commencing operation July~August 1990 16. If proposal was verbally approved Oil X Gas ~ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~~~ ~~~ ~'t./$,~t~/~l~Title Supervisor Gravi~/ Drainage FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test ~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~co~ ORIGINAL SIGNED BY LSL'NI~- C. fiMrTl-I /ADproval No. SUBMIT IN TRIPLICATE Approved by order of the Commission Form 10-403 Rev 06/15/88 INJECTOR PAC:< OFF BOP STACK CONNECTION Q UiCI,( UNION .... F BUND SHEARS FBUND i.... WHP ;SENSOR FPIPE SUP;S l FLANGED CONNECTION SWAB VALVE TYPICAL CTU STACK RECEIVED AUG o 9 · 'Uas/a.0il & Gas Cons. Commission Anchora~ FORM 1481 5/I0,/8g , WELL J-13 CTU CEMENT SQUEEZE PROPOSAL A coiled tubing cement squeeze of existing pedorations is proposed as follows: 1. Perform pre-workover acid perforation wash. 2. Rig up CTU and support equipment and pressure test BOPs to 4000 psi. 3. Pump cement and squeeze existing perforations. 4. Reverse out cement after the squeeze is obtained. Wait overnight, then test squeeze by performing an inflow test. If squeeze fails, immediately resqueeze. 5. If squeeze is successful, pedorate the following interval (ref:9-28-80 BHCS): 11293' - 11310' MDBKB 6. Return the well to production and test. 7. If the well will not return to production and/or sustain production, a perforation acid wash may be performed. BP EXPLORATION BP ExDloration (AlasKa) Inc. 900 East Benson Boulevarcl PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 05/30/90 EXXON T# 81193 PHILLIPS STATE OF ALASKA ARVHIVES SYSTEM T~,.De & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-~,H. 5. C-12 CH/CNT-D SCH#73881 C-21 CH/CNT-D SCH#73868 C-22 CH/CNT-D SCH#73869 J-13 CH/CNT-D SCH#73871 J-26 :-CH/CNT-D SCH#73874 05/14/90 1600bp~ 05/15190 1600bp~ 05/16/90 1600bp~ 05/17/90 1600bpI 05/17/90 1600bp~ #4 11096-11979 4 passes AP1#50-029-20387 #1 8489-9217 4 passes AP1#50-029-20753 #1 9292-10110.5 4 passes APi#50-029-20758 · TP#0706a ~'~..~J(-~/~/ #1 10779-11726.5 TP#07069 4 passes AP1#50-029-20497 #1 9812.5--10651.5 TP#07070 4 passes AP!#50-029-21734 Z-14 CH/CNT-D 05/16190 SCH#73872 1600bp~ #1 4 passes 9592-10251.5 TP#0707~j. AP!#50-029-21844 /'//~ .-~ Z-20 CH/CNT-D 05/16190 SCH#73873 1600bp~ #1 4 passes 10586.5-11568 TP#07072 AP!#50-029-21859 ~/_/Y'~-~ / ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. Dietz/S. McCurry Alaska Oil & Gas Cons. Commission Anchorage BP Exploral~on (AlasKa) Inc. 900 East Benson Boulevarcl PO Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 05/23/90 T#:81206 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINA[.:~ Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-21 CNL 05/15/90 #1 8500-9189 SCH 5" C-22 CNL 05/16/90 #1 9300-10088 SCH 5" J-13 CNL 05/17/90 #1 10800-11699 SCH 5" J-26 CNL 05/,17/90 #1 9820-10627 SCH 5" Z-14 CNL 05/16/90 #1 9600-10235 SCH 5" Z-20 CNL 05/16/90 #1 10650-11526 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION May 26, 1989 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well J-13 (22-03-11-13) PBU Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, ~;grogdLct ion Engineering JAM: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File " STATE OF ALASKA I~ ..,KA OIL AND GAS CONSERVATION COMM ,.,,,.,tN REPORT OF SUNDRY WELL OPERATIONS Stimulate Alter casing Plugging Repair well 5. Type of Well: Development X Exploratory Stratigraph~c i. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1049' SNL, 803' WEL, SEC. 09, T11N, RI3E, UPM At top of productive Interval 1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM At effective depth 1372' $NI., 2650' WEL, SEC. 03, T11N, R13E, UPM At total depth 1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11800feet true vertical BKB 9464 feet Perforate Other 6. X Datum elevation (DF or KB) KBE ,, 69.07 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J- 13 (22-03-11-13) 9. Permit number/approval number 80-83 / 8-946 10. APl number 50- O29-20497 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 11706feet true vertical BKB 9382feet Junk (measured) fi#at 11706'MD (01/89) Casing Length Structural -- Conductor 110 Surface 2643 Intermediate 10753 Production -- Liner 1531 Perforation depth: measured Size Cemented Measured depth 20 x 30 12 c.y. 137 13 3/8 3720 c.f. 2670 9 5/8 1665 c.f. 10780 11293.-11310' true vertical subsea 8957'-8971' 7 427c. f. True vertical depth BKB 137 267O 8607 10264-11795 8218-9460 Sqzd: 11146'-11168', 11178.-11198', 11208.-11238', 11246'-11278' Tubing (size, grade, and measured depth) 7" L-80 to 10226' with 4 1/2" tailpipe to 103,33' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. 9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077' ~I~,, '~,_ 'L~ ri_ i !~ ~" , . Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2220 14638 46 0 2348 Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 1590 1106 321 16. Status of wellclassEication as: Oil x Gas Suspended 0 167 Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ /'/~. ~ Title Manager Production Engineering Form 10/~ Rev 06/15/88 ~/(./ SUBMIT IN DUPLICATE WELL .I-13 (22-03-11.13] PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as detailed below: 12/19/88 Performed perforation mud acid treatment with ballsealers; flowed well. 12/29/88 Rigged up coiled tubing unit and pressure tested to 4000 psi. Cleaned out wellbore. 12/30-31/88 Cement squeezed all existing perforations. Reversed out cement. 1/14/89 1/16/89 1/17/89 Pressure tested squeeze. Rigged up Dresser Atlas and perforated the following additional interval using 3 3/8" Jumbojet guns at 4 spf: 11293' - 11310' MD BKB All initial perforations were left squeezed. Attempted to return well to production; would not flow. Nitrogen lifted well; returned well to production and tested. 5/22/89 Standa,d Alaska Productmn Company 900 Eas! Ben$on ~ule~ P O ~. 19~12 Anchorage A~sko ~519-~1~ (907) 564-5111 INDEXED HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL STAND/~RD ALASKA PRODUCTION Date: 01-20-89 TI: 79754 PHILLIPS STATE OF ALASKA GEOSC IENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: j-i3 CL 01-16-89 #1 11000-11470 Atlas 5" ~_ ~ Alaska Oil & ~s C~,~?, Commission Received Date A un,, of she or,g,nal Slondord Od Company Faunded ,n Cleveland. Oh,o ,n 1870 Shirley R. McCurry INFORMATION CONTROL Well Records LR2-1 · Standard Alaska ~ t Product,on Company %~ 900 East Benson Boulevdt~. PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION December 12, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well J-13 (22-03-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. Yours very truly, JAB: JAM Enclosures (9) cc: L. Burke (MB12-1) J-13 Well File oduction Engineering A umt of the or,g:nal Standard O,I Company Founded ,n Cleveland, Oh,o, ,n 1870 STATE OF ALASKA SKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend ~ Operal~on Shutdown ~ Re-enter suspended well__ Alter camng ~ Repair well ~ Plugging ~ Time extenaon ~ Stimulate ~ Change approved program ~ Pull tubing ~ Vanance~ Perforate~ Olher X 5. Type of Well: Development X Exploratory Str~graphic Service 6. Datum elevation (DF or KB) KBE = 69.07 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number J- 13 (22-03-11-13) 9. Permit number 80-83 10. APl number 50- 029-20497 11. Field/Pool Prudhoe Oil Pool 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1049' SNL, 803' WEL, SEC. 09, T11N, R13E, UPM At top of productive interval 1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM At effective depth 1384' SNL, 2639' WEL, SEC. 03, T11N, R13E, UPM At total depth 1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11800 feet Plugs (measured) true vertical BKB 9464 feet Effective depth: measured 11675 feet true vertical BKB 9354 feet Junk (measured) fill at 11675'MD (09/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 12 c.y. 137 Surface 2643 13 3/8 3720 c.f. 2670 Intermediate 10753 9 5/8 1665 c.f. 10780 Production -- Liner 1531 7 427 c.f. 10264-11795 Perforation depth: measured 11146'-11168', 11178'-11198', 11208'-11238', 11248'-11278' true vertical subsea 8902' - 9012' (four intervals) Tubing (size, grade, and measured depth) 7; L-80 to 10226' with 4 1/2" tailpipe to 10333' True vertical depth BKB 137 2670 8607 8218-9460 Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation December 1988 16. If proposal was verbally approved Oil X Gas__ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed~//,/~/~-~ ~/~.F~ Title Manager Production En~7ineering /'/. ' - ~/(.,/ FOR COMMISSION USE ONLY Con~t~ns of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test~ 15. Status of well classification as: Suspended Approved by order of the Commission Form 10-403 Rev 06/15/88 /2- I Approval No. ~'~:~ Subsequent form required Copy Returned - ORIGINAL SIGNED BY /~,~ .._./~/,., .- ~ ~. LONNIE C. SMITH ucm~;~,oner Date / SUBMIT IN TRIPLICATE J-13 NRWO PROCEDURE 1) Perform Tubing Acid Wash. 2) Flow well back. 3) Perform perforation breakdown with ballsealers. 4) Flow well back. 5) Install/Perform IUD. 6) RU CTU and pressure test to 4000 psi. 7) Reverse out sump fluids to about 11685 or hard fill. 8) Fluid pack the wellbore with PW. 9) Pump Cement with surfactant/mutual solvent preflush. 10) Perform cement squeeze. 11) Contaminate cement in the wellbore. 12) Reverse out contaminated cement and replace with clean PW. 13) WOC. 14) Add perforations as follows: 11,293'-11,310' MD (reference BHCS 9/28/80). 15) POP and test. Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Of'~ Blind Rams Cutter Rams 2' Chlcksan (Kill LI-~e) Slips Pipe Rams Pump-In Sub W ell Head Swab Val~e "~'L..-' (Circulate/Returns) SIondo,d AIQq. I. ,o { PO BOa, 19661~P A,whc~ocje AIo,,Lo 99519 ~1~ (gO/! ~6.4 ~ I I I TO: HOUSTON ARCO CHEVRON E~XON TEXACO MOBIL PHILLIPS STATE OF ALASKA ARCHIVES I NOEXED ..i._._I S-i'ANDARD ALASKA PRODUCTION Date: I0/10/88 T;: 79398 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt signing a copy of this letter and returning It to this office: C-18 D-07 P-13 E-08 F-01 G-01 G-07 H-28 J-13 K-03 K-09 N-0I N-02 M-05 M-16 R-10 U-04 U-05 V-19 Z-14 Z-15 Static 09/24/88 GO Static 09 / 24 / 88 GO Static Gradient 09 / 25 / 88 Otis Static Gradient 09/25/88 Otis Static Gradient 09/25/88 Camco ~c 09/26/88 GO Static Gradient 09/24/88 Camco Static Gradient 09/24/88 Camco Static 09/25/88 GO Static Gradient 09 / 22 / 88 Camco Static Gradient 09 / 28 / 88 Camco Static Gradient 09/22/88 Camco Static Gradient 10/03/88 Camco Static Gradient 10/02/88 Camco StSc Gradient 09/30/88 Camco Flowing Gradient 10/03/88 Camco Stair Gradient 09/28/88 Camco Static Gradient I 0 / 02 / 88 Camco StSc Gradient 10/02/88 Camco Static Gradient 09/30/88 Camco Initi~ Static Gradient 09/30/88 Sta~c Gradient 09/29/88 Camco Ot~ Race i ved ,,,,,, o,, c~.~., Nlchorage Jennifer Dietz INFORMAT I ON CONTROL Wel I Records I. R2-1 S~ando,d Alaska P.O. Box 196612 An~ho~oge. Alosho 99519-6612 (9O7) 564-5 ! ! ! DAIJ.~S ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD ALASKA PRODUCTION Da'f'e: 06/05/87 · ri: 77952 REFERENCE: SAPC CASED HOLE FINAL LOGS The roi lowing material Is being submitted herewith. Please acknowledge receipt by slgnlng a copy of thls letter and reYurnlng IY to this office= B-9 B-16 C-26 F-5 F-27 H-3 J-5 J-13 J-13 J-23 J-23 N-3 N-3 N-7 R-6 S-6 Race i ved Date Injection Profile 05/20/87 #1 9800-10058 Camco 5" Collar Log 05/19/87 #1 9900-10250 GO 5" DFT 05/11/87 #1 10500-11760 GO 5" Production Profile 05/17/87 #1 11100-11350 Camco 5" CBT 11/06/86 #1 9200-10620 Sch 5" Cont. Flow Survey 05/11/87 #1 9850-10137 GO 5" Cont. Flow Survey 05/17/87 #1 9950-10260 GO 5" Borehole Audio Tracer Survey 05/03/87 #1 2000-11600 GO 2" DFT 05/03/87 #2 Surf-il609.5 GO 2" Borehole Audio Tracer Survey 05/05/87 #1 1000-9800 GO 5" Temp. 05/05/87 #1 39-9800 GO 2" DFT 05/12/87 #1 11100-11700 GO 5" GR 05/12/87 #I 9100-11700 GO 5" Caliper 05/07/87 #1 10100-10571 GO 5" Injection Profile 05/14-15/87 #1 9900-10350 Camco 5" Cont. Flow Survey 05/10/87 #1 9950~10650 GO 5" // /~x~ a Oil & Gas Cons. Commission ' Victor±a Aldr±dge I NFORNAT I ON CONTROL Ne I I Records LR2- I A umt of the o~'~nol Standard Od Compony Founded ,n Clevelond Ohm ,n 1870 Standard Alaska ( P~oduchon Company 900 East Ben~o,, Roulevo,d PC) 6o, 196612 A,~¢horo~je Ah~k~ 99519 661 ~ DALLAS ARCO CHEVRON EXXON TEXACO D.-te: TO: MOBIL Ti: PHILLIPS STATE OF ALASKA GEOSC IENCES INDEXE0 STANDARD ALASKA PRODUCTION 05/11/87 77880 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning If to this office= B-16 D-3 G-4 $-13 R-26A Tubing Puncher 05/01/87 #1 8400-9110 Sch ~' Perf. Record 04/30/87 #1 10200~10645 Sch 5" Completion Record 04/26/87 #1 10100-10298 Sch 5" Temp/GR 04/29/87 #1 0-11685 Sch 2" Perf. Record 05/04/87 #2 9000-9601 Sch 5" §87 Rece i ved uu,,, .......... Victoria Aldr idge Anchorage i NF~T I ON C~TR~ a~ ....... Wel I Records LR2-1 A ii e o ol 51 j Founded m (le.eln~*,o ,,, 18~0 SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON GETTY ~o SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE {9071 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 9-22-84 CC#: 75755 REFERENCE S0~~__ASE____~D HO___LE F, TRAL LOGS /The following mater~al is being submitted herewith. Please acknowledge receipt by signing a ycopy of this letter and returning ~t to this office -- B-17 ~' THERMAL MULTIGATE DECAY 7-23-84 #1 10250-11250 D-18~ THERMAL MULTIGATE DECAY 6-23-84 ~1 10550-11323 J-13V Thermal Multigate Decay ' 6-23-84 #1 10800-11710 R-19 Thermal Multigate Decay 7-23-84 ~1 9450-10252 S-5 ~ THERMAL MULTIGATE DECAY 6-26-84 #1 10000-10685 S-13,~ Thermal Multigate Decay 6-26-84 #1 10750-11380 Welex Welex Welex Welex Welex Welex 5" 5" 5" 5" 5" (4/82) RECEIVED DATE ~ ~, ~ ~eve-opmenc ~eozogy 19 ,~ ~- Well Records SOHIO ALASKA PETROLEUM COMPANY SFO ARCO EXXON TO PHILLIPS CENTRAL FILES (CC#' s-Transmittal Onl7 INDEXED 3111"C"STREE~ ANCHORAGE. ALASKA TELEPHONEI907i265-O000 MAIL POUCH6-612 ANCHORAGE. ALASKA 99502 Date: 9-5-84 CC#: 75699 REFERENCE SOHIO MAGNETIC LIS TAPES & LISTINGS The following material is beIng submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office'-- SFO/UNIT/STATE: *J-11 TDT-LIS w/ Listing 7-12-84 ~1 C.H. Sch~69430 *J-13 TDT-EDIT w/ Listing 7-13-84 #2 C.H. Sch#69410 *M-16 TDT-EDIT w/ Listing 7-7-84 #2 C.H. Sch#69406 TAPE POS.f 03155 03163 03158 (4/82) *SFO & EXXON: An Asterisk.(*) next to a listing abo~e means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this ~' ~' ~- ', , ''  ~' ~ Develo~ent Geolosy DATE ' ' ~S Well Records SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO SFO/UNIT/STATE: GETTY (-Marathon) HOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) Date: 8-30-84 CC#: 75680 REFERENCE. RI__~O CASE~_D HO_~___LE__ FINAL LOGS e following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- J-il J-12 J-13 R-12 S-15 R-13 CNL TDT-M TDT-M TDT-M TDT-M TDT-M Compl. Rec. Compl. Rec. Compl. Rec. GCT Gyro Well GCT Gyro Well Perf. Record 7-18-84 #2 11000-11896 Sch 5" 7-4-84 #1 11250-11872 Sch 5" 6-26-84 #1 8850-9265 - - Sch .~ ~" ..... 7-12-84 #1 10100-10970 Sch 5" 7-14-84 #1 9150-10172 Sch 5" 7-13-84 #2 10800-11717 Sch 5" 7-7-84 # 2 10750-11630 Sch 5" 7-9-84 %0 9590 Sch 5" 7-18-84 %I 10822-10851 Sch 5" 7-19-84 #1 11022r110__60 ....... Sc.h__ 5" 7-5-84 #1 9950-10879 Sch 5" 7-4-84 #1 - - -11846 Sch - 6-26-84 #1 - - -9294 Sch - 7-22-84 #1 8700-10108 Sch 5" (4/82) RECEIVED DATE ...... -,,, ~u,io. ~-.u~.~sl0rl Carolyn Bishop Anchorage Development Geology ~9 Well Records *F-3 %/ F-9~ J_13w' ,R-17'~ (~ SOHIO ALASKA PETROLEUM COMPANY SON IO RESTR] C ED - ' ARCO , ~o EXXON PHILLIPS SFO REFERENCE: 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL. POUCH 6-612 ANCHORAGE, ALASKA 9950:2 Date: 1/27/82 # 1346 ' SOHIO MAGNETIC LIS TAPES & LISTINGS ........ The following material ~s being submitted herew,th Please acknowledge receipt by signing a copy of thins letter and returning mt to this ofhce:-- (Sch) CH-CNL #62453 12/28/81 #1 (Sch) CH-CNL #62451 12/29/81 #1 (Sch) CH-CNL #62452 12/28/81 #7 (Dres) CH-CN/MS ECC#1186 12/22/81 #-- (Dres) CH-CN/MS ECC#1187 12/21/81 #-- (Sch) OH-DIL/BHC/FDC/CNL #62456 1/1/82 #1&~ Carol/~ri~e ~r De ve 1 ~ ~ ,~ ~'~ e o 1 ogy Well ~Srds HQ 4-5 ( SOHIO RESTRICTED SOHIO ALASKA PETROLEUM COMPANY ARCO - __ - TO SFO/UNIT/STATE: ~ - (-Marathon) ,., ~oAE T~r~ns,m,,it~,ta, i O,nlv, ~ 311 1 "C" STREET ANCHORAGE, ALASKA TELEPHONE 1907) 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 9950:2 Date: 1/15/82 ~ 1326 REFERENCE SOHIO FINAL DAT~ followIng material ~s being submitted herewIth. Please acknowledge receipt by signing a copy of th~s letter and returning it to this office:-- SFO/UNIT/STATE: (-Marathon) FINAL CASED HOLE LOGS G-5 J-13 Spinner (Otis) 12/24/81 #1 CNLog/GR/MS (Dres) 12/21/81 #1 5{I 5" ~nt Geology ~,':~ ~~o rd s SOHIO ALASKA PETROLEUM COMPANY SOH IO COIIFIDENTIAL 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE {907) 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 ARCO TO EXXON Date: 9/10/81 # 1043 PHILLIPS SFO REFERENCE /SOHIO MAGNETIC LIS TAPES i The following matermal is being submitted herew,th Please acknowledge receipt by sigmng a , ~ copy of this letter and returmng it to this office'-- :,/SF0/.A?P-.~f~ j Computerized tapes ~ ' ~13' Ma~Lis~er) ,r ~,.,e.V..~ ,~ 30/01 #1 ,' __~* B- 14 " ' swer) #62057 7 30/8 ,-. SFO/AE ' Magnetic LIS Tape & Listing #62057 7/30/81 #1 " " " " #62136 8/22/81 #2 " " " " (Final) #62132 6/7/81 #5 " " " ," (Final) #62131 8/22/81 #1 " " " " ¢/62135 8/25/81 #2 SOHIO ALASKA PETROLEUM COMPANY SOH I 0 CO 'IF I DENT I AL 3111 'C S'[REET AI',ICHORAGE, ALASKA TELEPHOr,;E (907) 265 0000 MAIL POUCH 5 612 ANCHORAGE. ALASKA 99502 ~o STATE Date: 8/27/81 ~ 1015 C REFERENCE f~ SOHIO MAGNETIC LIS TAPE The following matenal ts being submated herewith Please acknowledge rece,pt by s~gn~ng a copy ofthtsletterandreturn~nglttoth~sofhce:-- N-13 '~' Corrected LIS Tape & Listing N-11 LIS Tape & Listing N-14 LIS Tape & Listing(Corrected) F-7 / LIS Tape & Listing Y-10,' LIS Tape & Listing G-13i LIS Tape & Listing Kuparu~ St.22-11-12 LIS Tape & Listing D-15~ LIS Tape & Li~ting R-9 LIS Tape & Listing Y-12j LIS Tape & Listing J-13' LIS Tape & Listing F-2 LIS Tape & Listing M-12 LIS Tape & Listzng H-16't' LIS Tape &,Eistzng #61732 6/18/81 #2 #61776 5/9/81 #62007 7/7/81 Hi #62036 7/21/81 #4 #62042 7/18/81 #1 #62043 7/23/81 #1 #62045 7/26/81 #1 #62051 6/27/81 #2 ~' #62052 7/24/81 #i #62055 7/25/81 #2 #62056 7/30/81 #1 ' ~62060 8/1/8] #1 #62071 7/31/81 #1 #62075 7/19/81 #1 S0H I O CO[ :l- I DE[iT I AL SOHIO ALASKA PETROLEUM COMPANY 3111 C S1REET * ANCHORAGE ALASKA ARCO --- ~vrc~o iLLEPHO;JE (907) 265-0000 ~ . -- ~'.IAIL POUCH 6 612 ANCHORAGE. ALASKA 99502 St.~,~: · -- TO SFO/UNIT/SIATE~:~I __ ' ' -- Date: 8/21/81 P~ll,p~ ..... - -' (-Maratbon) ~oAE _ . ...._ #1000 F REFERENCE hlheSOHIO FINAL DATA CAsed hole final data follow,ag material,s being subm~ttedherew~th Please acknowledge receipt by s~gn~ng a copy of th~s letter and returning ~t to th~s office -- f- B-14 D-3 / F-2 F-7 J-13 v,/ TDT-H (Sch) 7/30/81 [Il Sp~nner (Camco) 7/7/81 TDT-M (Sch) 8/1/81 TDT-M (Sch) 7/21/81 [/4 TDT-M (Sch) 7/30/81 ~/1 EPL (Sch) 8/3/81 [/2 (Sch) 7/21/81 [/1 (Sch) 7/19/81 Kuparuk St.)TDT~M 22-11-12~/)EPL 5~ 5" 5" 5" 5" 5" 5" 5" / i( F. C F:{V E D SOH I 0 'CONF I DENT ! AL SOHIO ALASKA PETROLEUM COMPANY TO SFO/UNIT / STATE ~ ........ - p~.,p, ...... - TELEPHONE 19 MAIL POL ANCHORAGE, co~,~,m~F - I ~C-'~ ~ ~ STZT ~-'C Date:6/18~81 ~ ~ REFERENCE SOHIO FINAL DATA The folio.wing material is being subm,tted herew,th Please acknowledge receipt by signing a copy of thIs letter and' returnmng it to this ofhce:- SFO/UNIT/STATE (-Marathon): PRESSURE SURVEY DATA ~/~.~1~ Bottom Hole Pressure Data Form & Survey ~ II !1 II !1 I! II (Otis) 6/10/81 (Camco) 5/22/81 RECEIVED ('.._/ ,,~' - -- Carol Krieter DATE 19 c~/ Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3'111 "C" STREET A,",CHORAG E, ALASKA TELEPHONE (907) 265 0000 MAlL POUCH 6-612 ANCHORAGE, ALASKA 99502 June 10, 1981 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Wells J-12 and J-13 Enclosed,' in duplicate, are the following forms for the above- named wells: 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notices and Reports on Wells; e Form 10-404, Monthly Report of Drilling & Workover Operations. GJP:JLH: ja Attachments Yours very truly, G. J. Plisga District Field Engineer cc: Well File #17 S. R. Bundy A. E. Leske Geology RECEIVED JUN 1 1 1981 Al3ska Oil & Gas Cons. Commission Anchorage ~ STATE Of ALASKA ALASKA ._ AND GAS CONSERVATION C MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Class~f~cat,on of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number Sohio Alaska Petroleum ~y 80-83 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20497 4 Location of well at surface 9 Umt or Lease Name 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM Prudhoe Bay Unit At Top Producing Interval 10 Well Number 1634' SNL, 2808' WEL, Sec. 3, TllN, R13E, UPM J-13 (22-03-11-13) At Total Depth ' 11 Field and Pool 1338' SNL, 2601' WEL, Sec. 3, TllN, R13E, UPM Prudhoe Bay 5 Elevat,o. ,n feet (,nd,cate KB. DF. etc ) I 6 Lease Des,gnat,on and Set,al No Prudhoe Oil Pool KBE = 69.07' AMSLI ADL 28281 12 Date Spudded 13 DateT D Reached 14 Date Comp.Susp orAband 15 Water Depth. ~f offshore 116 No of Complet,ons 9/7/80 9/27/80 3/26/81 feet MSLI one 17 Total Depth(MD+TVS)18PIugBackDepth(MD+TVD)19 Directional Survey I 20 Depth where SSSV sot I 21 Thickness of Permafrost 11800 'MD 9464 'TVD 11749'MD 9419'TVD YES [~ NO [] 2077 feet MD 2085' 22 Type Electric or Other Log~ Run DIL/GR, DIL/'L_L8/SP/GR, BHCS/GR, FDC/CNL/Cal/GR, CBL/VDL/GR/CCL 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE ITOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED , 20"x30" Insulated Conducto;$urface 110' 36" 12 eu.vds. 13 3/8" 72~ L-80 Surface 2670' 17 1/2" 3720 cu.ft. Arc~_i~_ 9 5/8" 47~ T~-80 .qurf~.~_ ]~780' 12 1/4" 1535 cu.ft. Class G;130cu.ft.Arcticset 7" 299 L-80 10264' 11795' 8 1~2" 427 cu.ft. Class G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, s~ze and number) MD TVD SIZE DEPTH SET (MD) PACKER SET (MD) Prudhoe Oil Pool - Top: 1114---6 ' 8902 ' 7"/4 1/2" 10333 ' 10226 ' Bottom: 11278' 9012' * 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC :[1146-11168 'BKB 0.5"@6spf (Ref.BHCS/GR, 9/28/80 IDEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED :11178-'11198 'BKB ,, ,, ( ,, ) 11208-11238,BKB ,, ,, ( ,, ) :[1248-11278'BKB ,, . ( ,, ) * Perforated @ 2spf increments in continuous operatio.n 27 PRODUCTION TEST Date F~rst Production Method of Operation (Flowing, gas I~ft, etc ) 3/26/81 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 24-HOUR RATE I~ 28 CORE DATA Brief description of I~thology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps None,/,,~, Form 10-407 Submit m duphcate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 30 GEOLOGIC MARKERS FORMATION TESTS NAME Include ~nterval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUEVERT. DEPTH GOR, and t~rne of each phase BKB Subsea Sag River SST 10874 ' ', 8611 ' Shublik 10927' 8653' Ivishak 11025 ' 8733' 31 LIST OF ATTACHMENTS None 32 I hereby certify that the foregoing ~s true and correct to the best of my knowledge S,gned ~_~_'J~ -~'~"F T,tle District Field Date /~ ~b /~, G. JT-Plisg~- Engineer - / - / ' INSTRUCTIONS General' This form is designed for submitting a complete and correct well..completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water ~njection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ co.mbustion. Item 5 Indicate which elevation is used as reference (where not otherwise shown) for depth measurements g~ven i~ other spaces on th~s form and in any attachments. Item 16 and 24' If th~s well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. ~ - . ~g, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- . STATE OF ALASKA (~' ALASKA .~ AND GAS CONSERVATION C ~IISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELLX] OTHER [] 2 Name of Operator Sohio Alaska Petroleum Company 3 Address Pouch 6-612, Anchorage, Alaska 99502 4 Location of Well At surface: 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM 5. Elevation in feet (~nd~cate KB, DF, etc ) KBE = 69.07' AM~L 12 Lease Des,gnat,on and Serial No AD]', 2R2R] 7 Permit No 80-83 8 APl Number SO- 029--20497 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number J-13 (22-03-11-13) 11 F~eld and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF: (Submit ~n Triplicate) (Submit ~n Duplicate) Perforate [] Alter Casing [] ~ Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following intervals were perforated March 26, 1981, using Dresser Atlas 3 1/8" Jumbo Jet carrier guns at 6 spf: 11146' - 11t68' BKB (Ref. BHCS/GR, 9/28/80) 11178' - 11198' BKB ( " ) 11208' - 11238' BKB ( " ) 11248' - 11278' BKB ( " ) An SSSVwas set and tested in the ball valve nipple ca. 2000'. RECEIVED ~aska 0il & Gas Cons. C01r~mja~,t0~ Anchorage 14 I hereby certIfy that the foregoing ~s true and correct to the best of my knowledge S,gned~ T,tle District Field Engineer The space below for Commission use Go J. Plisga Date Conditions of Approval, if any By Order of Approved by, COMMISSIONER the Commission Date Form 10-403 Rev 7-1-80 Submit "IntentIons" ,n Triplicate and "Subsequent Reports" ~rt Duphcate STATE Or: ALASKA ALASKA { _ AND GAS CONSERVATION C(]~" MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Drdl,ng well Workover operatton [] 2 Name of operator Sohio Alaska Petroleum Ccmpany 3 Address Pouch 6-612, Anchorage, Alaska 99502 4 Location of Well at surface 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM 5 Elevation ~n feet (~nd~cate KB, DF, etc ) KBE = 69.07' AMSL 6 Lease Designation and Serial No ADL 28281 7 Permtt No 80-83 8 APl Number 50- 029-20497 9 Umt or Lease Name Prudhoe Bay Unit 10 Well No J-13 (22-03-11-13) 11 F,eld and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of June ,19 81 12 Depth at end of month, footage drdled, hsh~ng jobs, d~rect~onal drdl~ng problems, spud date, remarks 13 Casing or liner run and quantities of cement, results of pressur9 tests 14 Coring resume and brief description 15 Logs run and depth where run 1 6 DST data, perforating data, shows of H2S, m~scellaneous data See attachment. I~ECEI VED JUN1 1 1981 Alaska Oil & 8as Cons. Al~Chora~ C°m~i$$io~ 17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge SIGNED --.- _ _ T~TLEDistrict Field Engineer DATE I NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be fded tn c~uuphcate w~th the Alaska Od and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise d~rected Form 10-404 Rev 7-1-80 Submtt m duphcate PERFORATING DATA - Well J-13 March 12, 1981: Pressure tested tubing and inner annulus. March 26, 1981: Rigged up Dresser Atlas and perforated the following intervals using 3 1/8" Jumbo Jet carrier guns at 6 spf: 11146' - 11168' BKB (Ref. BHCS/GR, 9/28/80) 11178' - 11198' BKB ( " ) 11208' - 11238' BKB ( " ) 11248' - 11278' BKB ( " ) Put well on production. June 6, 1981: Shut well in to prepare for static pressure survey. June 8, 1981: Ran static pressure/temperature survey at 8800' TVDss. June 9, 1981: Set and tested SSSV in ball valve nipple ca. 2000'. Well on production. RECEIVED JU~ 1 1 1,981 · as/~ 0;1 & Gas Cons. Co~nrniss/o~ AnChorage SOHIO IDENT]AL SOHIO ALASKA PETROLEUM COMPANY ARCO 31 11 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-OOOO MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 To SFO/UNIT/STATE:~ ..... -- Date: 5/19/81 # 806 _ _ £ i. I i iii i o __ I ! Il_ -- I REFERENCE - ~ SOHIO FINAL DATA // The follow,ng material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- _ SFO/UNIT/STATE: CASED HOLE 'FINALS: (-Marathon) ' A-9 ACBL/VDL 4/27/81 H-2 Spinner 4/26/81 H.-2 TDT-M 4/24/81 J-13 Spinner 4/20/81 N-1 Spinner 4/25/81 #1 5" #1 5" #3 5" #-- 5" #1 5" DATE Alaska Oil & Gas Cons. Commission Anchorage Carol Krieter Development Geol.ogy Well Records SOHIO ALASKA PETROLEUM COMPANY December 16, 1980 I I co~iE~ I -I COM~L_l 3;11 "C" STRE~ET I RES ENG AHCHORAGE., AL~'I~A] ENq~ /-,NCHO P AG E, I ~ GEbL% Z.,._ J ST~.T TEC "~l STAT TEC CONFER: FILF: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton RE: Wells Y-3, J-13, X-10, X-Ii, X-12, X-13 Gentlemen: Enclosed, in triplicate, are Forms 10-403, Sundry Notices and Reports on Wells, for the above-referenced wells. These notices contain our proposals to perforate the wells. G~. js very truly, k~ Distr ict-Pield Engineer G/P:~: ja Enclosures RECEIVED cc: Well File #17 S. R. Bundy A. E. Leske DE,., ! 9 ]980 Alaska 0il & 6as Cons. 6ommissior~ Anchorage STATE OF ALASKA ALASK/~' ~L AND GAS CONSERVATION C( MMISSION SUNDRY hO¥1CE$ AND REPORTS ON W' LLS DRILLING WELL COMPLETED WELL [] OTHER [] 2 Name o~ Opera~or Sohio Alaska Petroleum ~ny 3 Address :Pouch 6-612, Anchoraqe, Alaska 4 Local,on of Well 99502 At surface: 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM 5 Elevation ~n feet (,nd~cate KB. DF. etc.) KBE = 69.b7' AMSL Lease Des,gnatlon and Serial No 12 ADL 28281 7 Pe,m~t No 80-83 8 API Number so- 029-20497 9 Umt Or Lease Name Prudhoe Bay Unit 10 Well Number J-13 (22-03-11-13) 11 F,eld and Pool Pr udhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not.e. Report. or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF: (Submit in Trlphcate) (Subm,t m Duplicate) Perforate [~ Alter Casing [] ~ Perforat,ons [] Altering Cas,ng [] Stimulate [] Abandon [] St im ulat ion [] Abandonment [] Repa,r Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple complet,ons on Form 10-407 w,th a submitted Form 10-407 for each completion.) 13 Describe Proposed or Completed Operations (Clearly state all pert,nent details and g~ve pert,nent dates, mcludmg est,mated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following intervals will be perforated during January/February, 1981, using GO Int'l. 3 1/8" carrier guns at 4 spf: 11146' - 11168' BKB (Ref. BHCS/GR, 9/28/80) 11178' - 11198' BKB ( " ) 11208' - 11238' BKB ( " ) 11248' - 11278' BKB ( " ) An SSSV will be set and tested in the ball valve nipple ca. 2000'. RECEIVED Alaska 0~1 & G2s C0q3, Comm~ssi0n reby~ ~ Apchoragc 14 I he f ~s true a~d correct to the best of my knowledge S,gn~ ~~~ ~ ~ T,tle District Field ~gineer The s c~belo~ fo]~Co m,sslon use GOJ. Plisga Cond s of App, uv~,, ,f any. Form 10-403 Rev. 7-1-80 By Order of Approved by COMMISSIONER the Comm,ss,on . Date Approved Copy ~.etdrned Date / 2--//?~'/~ Submmt "lnten~ons"'~n Tr,phcate and "Subsequent Reports" ~13 Duplicate SOHIO PETROLEUM COMPANY 3~ "c~j~:. Division of Sohio Natural Resources Company ANCHOR;GEJ SOHIO-BP ALASKA PRODUCTION DIVlSi ~ MAIL: POU~?_ s~o/~z~/st~/ ~ ~ z0/8/80 ~]]~ ~ (10/~/80 State) ~o ~ REFERENCE: SOHIO OPEN HOLE FINAL DATA (~The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 'O/UNIT/STATE: J-13 DIL/SFL 9/23/80 & 9/28/80 ¢t1&2 J-13 BHCS 9/28/80 ¢12 J-13 FDC/CNL 9/29/80 ¢~2 3-13 FDC 9/29/80 #2 2" & 5" 2" & 5" 2" & 5" 2" & 5" ,TATE ONLY: J-13 J-13 .~..J-13 Sidewall Summary Sheet Magnetic Single Shot Survey Gyroscopic Survey lO/7/80 lo/b/80 Carol Krieter Well Records DATE 19 Recli-Kwtk, Quality Litho SOHIO ALASKA PETROLEUM COMPANY October 23, 1980 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well J-13 (22-03-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations for the above-named well for the month of October, 1980. WRH:ja Enclosures cc: Well File #17 Yours very truly, Acting District Drilling Engineer " STATE OF ALASKA ALASK_~ 'L AND GAS CONSERVATION CC. IMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1 Drdl~ng well [] Workover operation [] 2 Name of operator 7. Permit No. Sohio Alaska Petroleum Company 80-83 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20497 4 Location of Well 9 Umt or Lease Name at surface Prudhoe Bay Unit 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM* 10WellNo J-13 (22-03-11-13) 11 Field and Pool *Corrected Prudhoe Bay, 5 Elevation ~n feet (~nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No Prudhoe Oil Pool KBE = 69.07' AMSLI ADL 28281 For the Month of. October , 19 80 12 Depth at end of month, footage drdled, hshmg jobs, d.rect~onal drdl~ng problems, spud date, remarks Directionally drilled 8 1/2" hole to 11800'. Ran open hole logs and took 62 sidewall samples. 13 Casing or I~ner run and quant~tms of cement, results of pressur9 tests Ran 38 jts. 7" 29# L-80 Buttress casing to 11795'. Cemented with 427 cu.ft. Class G cement. Cleaned out to 11749', tested casing to 3000 psi, okay. Changed well over to NaC1, ran CBL. Ran 264 jts. 7" 26# L-80 IPC tubing with 3 jts. 4 1/2" CS Hydril tailpipe. Landed tailpipe at 10333' with ball valve at 2077'· 14 Coring resume and brief description Sidewall samples taken· Report will be forwarded on well completion. 15 Logs run and depth where run CBL/VDL/GR/CCL at 11800' 1 6 DST data, perforating data, shows of H2S, m~scellaneous data Installed and tested tree· Displaced tubing to diesel, set packer at 10226'. Tested tubing to 3500 psi, okay. Released rig at 0800 hours, 10/4/80· 17 I hereby certIfy tha he rue anO correct to the best of my knowledge D~.~ i~/~ Acting District I SIGNE ,7 ~o · u;,,~- TITLE Drilling Engineer DATE fl · ,.i.~, e 4. a,,..,.1 , ,-.,,..,. .... NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be fded ~n duphcate w~th the Alaska Od and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise d~rected Form 10404 Submit ~n duplicate Rev 7-1-80 WELL: J-13 pg 1. DEPTH 11450' 11420' 11405' 11400' 11385' 11380' 11350' 11340' t1335' [1330' 11325' I1320' 11275' [1250' [1210' t1165' t1135' t1095' t1040' 11035' 11030' 11025' 10930' 10925' 10920' 10905' 10885' 10880' 10875' 10870' 11685' 11657' 11437' 11615' 11605' 11563' 11541' 11527' 11506' 11473' 11430' 11420' 11380' 11325' 11300' [1250' t1230' ~1210' [1184' [1147' tll14' t1077' t1062' 11035' 11017' 10984' 10958' 10931' 10904' 10870' SIDEWALL CORE REPORT RECOVERY ~o ~o ~o ~o No ~o ~o ~o ~o ~o ~o LITHOLOGY SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS Shale SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS Shale SS SS SS Shale WELL: J-13 pg. 2 SIDEWALL CORE REPORT DEPTH 11715' 11696' 11650' 11628' 11607' 11584' 11554' 11516' 11492' 11464' 11456' 11415' 11370' 11316' 11296' 11284' 11262' 11231' 11212' 11195' 11175' 11155' 11105 ' 11086 ' 11046 ' 11005' 10976' 10915' 10894' 10858' RECOVERY Yes Yes Yes Yes Yes Yes No No Yes No Yes Yes No Yes Yes No No No No Yes Yes No Yes Yes No Yes Yes No Yes LITHOLOGY Shale Shale SS SS SS SS SS SS SS SS SS SS SS SS SS SS Siltstone SS Shale SOHIO ALASKA PETROLEUM COMPANY October 23, 1980 MAIL. POUC~I ~6-~1g ~_g~ I ANCHORAGE, AL~ CONFIDEN~ Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well J-13 (22-03-11-13) Enclosed, in duplicate, is Form 10-407, Completion Report, for the above-named well together with the Well History, Well Logs, Directional Surveys, and Sidewall Core Data Sheet. This well has been suspended pending perforating operations. WRH: ja Enclosures cc: Well File #17 Geology Yours very truly, Acting District Drilling Engineer ,., STATE OF ALASKA (' ALAsK .; AND GAS CONSERVATION C MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Serv,ce Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number Sohio Alaska Petroleum Company 80-83 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20497 4 Location of well at surface 9 Umt or Lease Name 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM* Prudhoe Bay Unit At Top Producing Interval 1 1705' SNL, 2927' WEL, Sec. 3, TllN, R13E, UPM J-13 !(22-03-11-13) At Total Depth il F~eld and Pool 1338' SNL, 2601' WEL, Sec. 3, TZ1N, R13E, UPM *Corrected Prudhoe Bay,Prudhoe Oil Pc.( 5 Elevat~on;t~e~t (md,cate KB, DF, etc ) ~ 6 Lease Des~gnat,on and Ser,al No KBE =--(69/67'AMSL:BF=41.87 'AMS~ ADL 28281 12 Date Spuddedk"/ 13 Date T D Reached 14 Date Comp, Susp or Aband 15 Water Depth, if offshore 116 No of Completions 9/7/80 9/27/80 10/4/80 feet MSL 17 Total Depth (MD+TVD) 18 Plug Back Septh (MD+TVS)19 $1rectlonalSurvey I 20 Depth where SSSV sot I 21 Thickness of Permafrost ll800'MD 9464'TVD 11749'MD 9419'TVD YES~ NO[] 2077 feetMD 2085' 22 Type Electric or Other Logs Run DIL/GR, DIL/LLB/SP/GR, BHCS/GR, FDC/CNL/Cal/GR, CBL/VDL/GR/CCL 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"x30" Insulate~ Conductc,r Surf. 110' 36" 12 cu.yds. Arcticse' concrete 13 3/8" 72~ L-80 Surface 2670' 17 1/2" 3720 cu.ft. Arctics,~t II 9 5/8" 47~ L-80 Surface 10780' 12. 1/4" 1535 cu.ft. Class G 130 cu.ft. Arctics 7" 29# L-80 10264' 11795' 8 1/2" 427 cu.ft. Class G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD ~nterval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7"/4 1/2" 10333' 10226' None 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27 PRQDUCTION TEST Date F~rst Production Method of Operation (Flowing, gas I~ft, etc ) Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF. WATER-BBL OIL GRAVITY-APl (corr) Press 24-HOUR RATE 28 COP E DATA Br~efdescr~pt~onofl~thology, poros~ty, fractures, apparent d~ps and presence of o~l, gasorwater Subm~tcorech~ps See attached sheet. ,,, .ol t I Form 10-407 Submit in duphcate Rev 7-1-80 CONTINUED ON REVERSE SIDE { ~,, 29 30 GEOLOGIC MARKERS FORMATION TESTS NAME Include ~nterval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUEVERT DEPTH GOR, and t,me of each phase BKB Subsea Sag River SST. 10874' 8611' Shublik 10927' 8653' Ivishak 11025' 8733' 31 LIST OF ATTACHMENTS Well History, Well Logs, Directional Surveys, Sidewall Core Data Sheet ... 32 I hereby certify that ~ Is true and correct to the best of my knowledge __~'~~ Acting'District S,gned T,tle Drilling Enqineer Date / INSTRUCTIONS General' This form is designed for submitting a complete a~d correct well completion report and log on all types of lands and leases in Alaska. Item 1 Classification of Service Wells: Gas injection, water ~nject~on, steam injection, air injection, salt ,water disposal, water supply for ~njection, observation, injection for inositu combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachn~ents. Item 16 and 24. If th~s well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of th~ cem~ntin9 tool WELL J-13 (22-03-11-13) WELL HISTORY September, 1980 Spudded well at 1200 hours, September 7, 1980. Drilled 17 1/2" hole to 2686'. Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2668'. Cemented with 3720 cu.ft. Arcticset II cement. Installed and tested BOPE. Drilled out to 2670'. Ran leak-off test to 0.64 psi/ft, gradient. Directionally drilled 12 1/4" hole to 10786'. Ran open hole logs. Ran 276 jts. 9 5/8" 47# L-80 Buttress casing to 10780'. Cemented in two stages: First stage with 1535 cu.ft. Class G cement; second stage through D.V. packer at 2603' with 130 cu.ft. Arcticset I cement preceded by Arctic Pack. Cleaned out to 10737', tested casing to 3000 psi, okay. Drilled out to 10810'. Performed formation competency test to 0.7 psi/ft. gradient. October, 1980 Directionally drilled 8 1/2" hole to 11__!_~'. Ran open hole logs and sidewall cores. Ran 38 jts. 7" 29# L-80 Buttress casing to 11795'. Cemented with 427 cu.ft. Class G cement. Cleaned out to 11749', tested casing to 3000 psi, okay. Changed well over to 9.6 ppg. Nacl. Ran CBL. Ran 264 jts. 7" 26# L-80 IPC tubing with 3 jts. 4 1/2" CS Hydril tailpipe. Landed tailpipe at 10333' with ball valve at 2077'. Installed and tested tree. Displaced tubing to diesel, set packer at 10226'. Tested tubing to 3500 psi, okay. Released rig at 0800 hours, October 4, 1980. GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY PAl') COMPANY WELL NAME II]] II LOCATi~-N~ AL-9-80-D-26 Single Shot 10-7-80 JOB NUMBER TYPE SURVEY DATE Kent Asa.v NAME Engineer TIT'LE' ......... ' -~ Si'GNATURE - DEPTH INTERVAL 1986 11,800 FROM TO 9-7-80 DATES SURVEY WAS TAKEN FROM 9-28-80 TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, all copies of the survey report will be forwarded to you on written request. All surveys are kept in a locked file and are held in strictest confidence. AdditIonal copies of your survey report can be made from the original by any blueprint company. ¢C~DLETIO-N REi~6RT .................................. :3 OCT 80-' SOHIO ALASKA PETROLEU~ WELL J-13 MAGNETIC S[NGLE ~OT SURVEY K B ELEV 69.07 RA01~S OF CURVATURE ~T~'-'OF ~O~PUTATION C~PUTED F~ GLDD BY FM LINDSEY & ASSOC RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY ! B M ELECTRONIC COMPUTER ....... T-RUE ...................................... OOG-EEG MEAS. DRIFT VERTICAL SUe DRIFT TOTAL COORDINATES C L 0 ,.% U R E $ SEVERITY DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/IOOFT 0 0 0 0.00 -69.07 N O.OOE 0.00 S 0,00 ~ 0.00 S 0 0 0 ~ 0*000 ASSUMED VERTICAL TO 1986. 1986 0 0-' 1986.00--1916.gT--N-O%OOE" G~OO--S .... ~.OO W ...... O~OG 2066 3 O 2065.96 1996.89 Na0eOOE 1.92 N 0.70 E 2.05 N 20 0 0 E 3.752 2128 5 0 2127.80 2058073 N3OeOOE 5.46 N 3.17 E 6.32 N 30 10 2190 6 45 218gb~8- 2120.4[- NITeOOE'- -11.27'-R ...... ~70-E ..... 12~63-N26 50 2253 9 0 2251,88 2182.81 N17.00E 19-52 N 8.22 E 21,18 N 2365 12 30 2361,90 2292.83 N22,00E 39-21N 15,19 E 42,05 N 21 2467 16 ~0 2&6'eTa. .... 239[~67 N29.OOE ~-61.85 N .... 2~.-99'-~ ..... 67.0? 2560 18 30 2549.55 2480.48 N29.OOE 85.97 N 39.36 E 94.55 N 24 36 12 E 2.688 2731 23 0 2709.42 2640.35 N33.00E 137.87 N 70.55 E 154.88 N 27 5 59 E 2.656 2~25 ~5 15 2795.20~ -2726*I3 ~2B.OOE--170,9T N .... 90'~0~"-E ..... 2917 27 15 2877.71 2808.64 N31.00E 3011 30 0 2960.21 2891.14 N31.OOE 3135 31 15 3066.92 2997.85 N31,00E 3259 33 0 3171.93 3102,86 N31.00E 3383 36 0 3274.11 3205.04 N30e0OE 3506 38 45 3371.84 3302.77 N29.0OE 3660 41 30 3489,59 3420,52 N28-00E 3719 43 0 3533.26 3464,19 N28.00E 394~ 44 0 3700. Oq 3631.02 N28iOOE ~476 42 45 4083.15 ~O1~.08 NZg.0OE 1061.20 N ~870 ~1 15 ~375.9~ ~306.87 N32.00E 1288.33 N 206.38 N 110-08 E 233.90 N 28 4 30 E 2.279 244.97 N 133.27 E 278.88 N 28 ~2 50 E 2.926 299.12 ~ I65;80 E - -3~2.00 N 29 O- 0 E .... 1.008 355.6~ N 199.76 E ~07.90 N 29 19 24 E 1.411 416.1~ N 235.40 E 478.11N 29 29 ~6 E 2.435 481.I2-N .... 272~17 E '- 552.77 N'29 29 48-E-- 2.258 568.33 N 319.52 E 603.36 N 338,14 E 743.Iq N- -~I2.qT- E 585.16 E 718.95 E 651.99 N 29 20 41E 691.65 N 29 16 4 E 849.94 N 29 I 54 E 1211.8½ N 28 52 22 E 1q75.36 N 29 9 48 E 1.808 2.542 0-435 0*253 0.50~ SECT "'~ D l STAN,,,E 0.00 1.99 6-31 20.8~ 41.08 93.42 ~32.86 277.85 406.83 ~76.96 650.30 689.79 1207.9~ la71,18 SOH[O WELL J-t3 SINGLE SHOT SURVEY 3 OCT 80 ................ ' RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B N ELECTRONIC COHPUTER - t TRUE DEPTH ANGLE DEPTH O tq SUB' DRIFT- TOTAL COORDINATES C L 0 S U R E S SEA DIREC DI STANCE ANGLE DEG. D M $ 5186 /sO 0 46!5.77 4546J70 N~IeOOE X463o75 N 5590 ~9 0 4927e9,0 4858.43 N33eOOE 168Xo67 N 826.45 E 962*61 E 1937069 N 29 47 1~ E DOG LEG SEVERITY DEG/IOOFT 0.417 00316 0.~59 0.177 0.449 7113 41 1~ 608.4,~0 601~.4~ N~4eOOE 2500,Z~ N ~9,~1E 292~,72 N 31 17 14 E 0.167 7306 ~1 0 6229,88 6160,81 N3~eOOE 2606-10 N 1589.~7 E 3052057 N 7927 ~ 0 b6Bb,7~ 6617,6~ N~,OOE 2957.73 N 1820,0~ E 3~72,~6 N ]1 36 22 E 0.~31 ~320 ~2 0 69~9~51 b~0,~ N}6,00E ]196,77 N 19870~ E ~76~.19 N }1 52 8 E 2.060 SECTIOa ~ISTANCE 1676080 193306~ 2132.19 2367.94 2560048 2b61.20 - 2923069 3050.52 3471.02 3762072 --Bsog'-'~--~S~~'V~J~ ..... b~0,~9--~:~7.OOE--'3320~Z~'-~~'~-~~'91?~29-N 32 3 -1E - 2,5~0 -- 3916,O8--- 871~ 58 45 716809~ 7099088 N37.OOE 3458068 N 2183011E 4090004 N 32 13 36 £ 00976 4089.12 8839 58 4~ 7233090 71tldi.,73 N37,OOE 3544002 N 22470k2 E 4196055 N 32 22 50 E 0.000 4195.78 '--89T~-'~5---0---T3Og'iI~--T2~O-~2~I~5~0OI:---3637,-S0 ~---211-5-s~-E----~311.87 fl-32 28 39 E 20886 -- ~t1.2~--- 9081 50 45 737109~ 7~02088 N35.OOE 3705041N 2362089 E 4394069 N 32 31 30 E ~0087 4394.09 9926 42 ZS 796~0~2 789~00S N3~.OOE 4202027 N 2707076 E 4999.10 N 32 47 45 E 00732 499B075 106~1 lO ~0 8179~10 8110~0~ N37.OOE ~81,78 N ~973e~6 E 5~6ZeOT N 3~ 58 ~7 i 0,6~ 5~61,87 :1173~ ~9 0 9390,I~ ~3~1.~5 N)8.00E 5083.~3 N 3358e3~ E 609~,50 N 33 ~7 3 i 1,03~ 6092,~0 'THE FOLLOWING INFORNATION IS EXTRAPOLATED TO TD '11800 29- -0 .... 9&-iFg;Hg-'-qifSO;-SZ~N38.OOE -5109,31 R '-~378~62-'~ ...... 6125037 N 35-28 31 E 0.000 612~.-S7- - i 'BOTTOM HOLE CLOSURE 6125037 FEET AT N 33 28 31E $(1~410 WELL ,,/"1} ........ SINO..LE SHOT INTERPOLATED TRUE VERTICAL DEPTHSt COORDINATES AND CLOSURES FOR GIVEN DEPTHS OCT 8O ........................... TRUE .......................... CODE MEASURED VERTICAL TOTAL COORD ! NATES NAME DEPTH DEPTH C L O $ U R E SUB STANCE ANGLE SEA ...... D- M-*S .............. TD -' .,sol41 o' ~ELL SINGLE 'SH~S~~- ' OCT 80 ................... qEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTHe TRUE MEASURED"- - VERTICAL--SUB----- HD.:.TVD ...... VERTIC.~'~L-- DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 469 569 669 769 869 969 1069 1169 1269 1369 1469 1569 1669 1769 169 169. 100 0 0 269 269· 200 0 0 369 ............. 369· .......... ]O(Y .......... 0 469· 400 0 569* 500 0 0 6'6-9· --- 600 ....... 0 ................ 0 769· 700 0 0 869· 800 0 0 969, .... 9 OD-- .......... 0 ...................... 0 0·00 S 0,00 0·00 S OeO0 W .... 0,;00 $ ........ 0.0'0--'1~ 0,00 S 0.00 W 0,00 $ 0.00 W 0.-00 $-- 0~00 W 0,00 $ 0·00 O. O0 S 0·00 0.00 & 0,00 W 0.00 S 0.00 W 0,00 $ ....... O~O0* If 0,00 S 0.00 ¥ 0·00 $ 0,00 "' O, 00- S -- - 0 · 00 -W 0,00 S 0,00 W 0.00 S 0.00 W 1069, 1000 0 0 1169- I100 0 0 I269 g----1200 O* O 1369. 1300 0 0 1469, 1400 0 0 ...... 1569~ ...... 1-500-- ........ 0 .... 13 1669· 1600 0 0 1769, 1700 0 O 1869 1969 2069 2169 2270 2372 2476 2581 2687 2796 2907 3021 3137 3255 3377 3633 3768 1969. 1900 0 0 2069* 2000 0 0 2169;'- 2100 2269· 2200 1 2369· 2300 3 2469, - 2400 2569· 2500 11 5 2669° 2600 18 7 0·00 S 0-00 ~ 2*05 N 0,80 E .... 9a05 N ....... e-~90- E 22.14 N 9,04 E 40.62 N 15.77 E .... 63.95 N 27e16- E ...... 91.76 N 42,60 E 123e71 N 61.59 E 2769· 2700 27 2869· 2800 38 2969· 2900 52 3060° 3000 * 68 3169, 3100 86 3269- 3200 107 3~69, 3300 ..... 1~3-- 3469, 3400 163 3569, 3500 198 9 ............ I60-28 N 11 14 16 1.8 21 3O 202,46 N 249°27 N ~' 300-0I N 353.78 N 412,99 N --84,15 E ..... 107-75 E 135,8~ E 166,'~4 E ........... 198·64 E 233·~8 E ~78e9~ N ' --ZTOe96 E ....... 552.63 N 311.13 E 632e92 N 353·86 E SINGLE SHOT SURV£'~ MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, OCT 80 MEASURED - DEPTH TRUE VERTICAL SUB MD-TVD -'-DEPT~--SE-A-DXFFERENCE .... VERTICAL CORRECTION-------TOTAL COORDINATES-- -3906 ......... '36-69'~ ..... 3600- '- 236 4045 3769. 3700 275 4183 3869. 3800 313 43:20 396"'9,-- -3-qO'O-- -- ~57 ~069. ~000 387 ~593 4169. 4100 423 '~72 7 ............. ~26x~;- ....... ~200 ~ ' 457 4861 4369. 4300 491 4993 4469. 4400 523 5125 5255 4669. 4600 586 5385 4769. 4.700 ..... 38 ..... 716.82 39 801.67 38 885.54 37--' 968.25' 37 10~9.81 36 1129.83 34 --- I207- 63 34 1283.21 32 1357.14 31 I$01.63 29 1372.48 5643 4969. 4900 674 5773 5069. 5000 703 ........ 5902 ......... 516q~ .... 5100--733 6033 5269, 5200 763 6163 5369. 5300 794 -- 62q4' ....... 5q69. -5qO0'- - 825 6426 5569. 5500 856 6558 5669. 5600 889 -- 6692 .... 57-69' .... 5700 -' ~22 6825 5869. 5800 956 6959 5969. 5900 989 7092 6069. 6000 I023 7225 6169. 6100 1056 7358 6269. 6200 1088 7~92 6369. 6300 1122 7627 6469, 6400 1158 7764, 6569. 6500 1194 7902 6669, 6600 1233 8044 6769. 6700 1275 8193 6869. 6800 1324 8352 6069. 6900 1382 8526 7069, 7000 1457 29 29 3~ 30 31 31 34 33 34 33 32 36 36 39 42 49 58 75 1709,60 1777.73 18'~-7T- 1912082 1980.90 -2050,06 2120.89 2193.11 .... 2267k35- 2341,58 241.5.84 2~88~76 2.561 · 59 2634079 .... 2709- 52 2785.90 286~e 30 .... 294303~' 3026.24 3117,03 ..... 3217030 3331059 N --398-.~'7- E'-- N 443,71 E N 488089 E 1~ ---- N 578,8~ E N 623089 E ~' - N 71~-7.~ E N 761.6Z E 849, 36 893.0S 980.93 1027011 1123,81 1172032 1269,~1 1317,21 1413084 E 1462089 E 15II. 67'-E--- ...... 1560,33 1608.11 E -1696.6~- E 1706,24 E 1757.65 1810.3'6 E 1866.81 E ].930e33 E 2002,~J9 E 2087,34 E SOHIO ~E;~'L J-i3 INGLE SHOT SURVEY OCT 8O' HEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. TRUE MEASURED *VERTICAL SUB" MD~TVD ...... VERTICAL ........... DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 8714 7169. 7100 1545 88 8905 7269, 7200 1635 90 9076 7569; ...... 7300--1707 ............ 7Z 9230 7469. 7400 1760 9~76 7569. 7500 1807 47 9662 7769. 7700 1893 41 9801 7869. 7800 1931 38 9937 .... 7969. -~- 7900 -I967 10072 8069. 8000 2002 10207 8169. 8XO0 2037 10342 826qg---8200--2072 10475 8369. 8300 2105 33 10608 8469. 8400 2138 33 10738 '--8569.--°8500 .... 2168 ......... 30 10866 8669. 8600 2197 29 10992 8769. 8700 2223 26 11116 8869, .... 8800-- 2246 11238 8969. 8900 2268 22 11358 9069, 9000 2288 20 I1476 916q. 9100- 2306 11592 9269, 9200 2323 17 11707 9369. 9300 2338 15 3458.68 N 2183.11E 3589.12 N 2280.8] E 3702.23-N- - 2360i66'E ........... 3798.12 N 2427.80 E ~885.42 N 2488e93 E ~971*19 N 2548.9? E 4053.41N 2605.~ E 4132.51N 2659.~1E 4208,XS-N --2711-&90-'E-'- 428~,79 N 2763~7X E 4~7.75 N 2815,01E · 432.65 N"**-'*286~egOE-~- 4505.15 N 2916,98 E 4574.92 N 2968.30 E 4641,85 R~-3018*.SX E ............ 4705.67 N 3067,17 E 4766.49 N 3113,46 E ~.824,75 N ....... 3t57,98- E .................. 4879,97 N 3200,~7 E 4932e44 N 3240-83 E 4982.25 N 5029,2~ N 331~,99 E 5074,05 N 3351,0~ E $OH ! 0 WEkV~"-_! 3 ' SINGLE SHOT SURVE'~'~ OCT 80 INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTHe TRUE HEASURED VERT ! CAL SUB DEPTH - -- DEPTH .... SEA TOTAL 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 1000 I000. 930, 0-00 29.50, 2881. 240.28 N 130.45 E 3736- 3667, 774.38 N 429,11 E ~4474g .... 4~04 ~ ............ 1360.8~'F--- ~3~ 5243, . 5174, 5999. 5930, 6738'* ..... 7322,. 7253, 8015. 7946. 8775-. .... 8706. 1895.62 N 1111.¢6 E 2438,29 N 1477,84 E 3000; 24i- -R*- - ! 848'92 - E- ..... 3652.,85 N 2326.08 E 4243-08 N 2736,23 E HORIZONTAL VIEW SOHIO ALASKA PETROLEUM WELL d- I$ RADIUS OF CURVATURE MAGNETIC SINGLE- SHOT SCALE I"" IOOO' OCT. 6, 1980 g'tO0, TVD = 9450' TMD& 11,800' 1~,,.~. °E~,T.S s.°W, ARE TVD- , - r j-sun d A Fouch~ President Mr. Gary Plisga Sohio Alaska Petroleum Company 3111 C. Street Anchorage, AK 99503 Oc.tobe~ 7, 1980 Re: Our Boss Gyroscopic Survey Job No. Boss-16674 Well-J-13 (SEC9 Tll R12E) Prudhoe Bay Field North Slope, Alaska Date of Survey: October 6, 1980 Operator: Mike Gary Dear Mr. Plisga' Please find enclosed the "Original" and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you fog giving us this opportunity to be of service. KB/kc Enclosures Yours very truly SPERRY-SUN, INC. Ke/n Broussard .......... ~-~'~-fSUN WELL S,.,¢VEYING ANCHORAGE, ALASKA SOHIO ALASKA d-j= ., (SEC9 T11N R1BE) ~'6~-b'TATION DATE PRUBHOF [:AY OCTOBER 7~ 1980 COMPANY PAGE DATE OF SURVEY OCTOPER 6, BOSS GYROSCOPIC SURVEY ,JOB NUMBER BOSS-1667~ K E LL.Y__~_U_S_.U_LN_O__E_L_E V, ,, = 69__,_0_7 F T, OPERATOR-MIKE GARY ................. T_RUE .................. S.U~.- SE A_ ..... COURSE ........ COURSE MEASURED VERTIC/~L VERTICAL INCLINATION DIRECTION DEPTH DEPTH DFPTH DEG MIN DEGREES O o 6. SEVERITY DEG/iOD T~O .T_AA L_ RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERTICAL SECTION ]00 200 300 4OO 5OO 600 700 800 9OO 1000 1100 t2oo 1300 1 oo 1500 1600 ]700 1800 1900 2ooo 2100 7200 2300 2~00 2500 2600 _ 2700 2800 2~00 o.oo -gs.o - o o 100.00 30.q3 0 28 199.99 ..... 1%0.o2 ......... 0 .... 58 29g.97 250.90 0 59 399.96 330.~9 0 55 599.94 b30.FI7 0 52 6,99.93 630.g6 0 50 799,92 t~99.q2 830,8b 0 19 999.~1 930.~4 0 21 N O. 0 E 0.00 S 29.39 W S 25.60 S 24.10 E .02 S 11. 0 E .23 S 25. 0 C . .,30 S 26.19 E ,18 S qS. 0 E .28 S ~5.50 ~' .~6 S 53.30 E .05 0.00 0,00 · 36 S ,20 W 1.q9 $ ..... ..0__6 W 3.05 S .63 E 4.64 S 1.14 E 7.23 S 2.15 E R.-,'+4 S . 3.00 E 9.78 S 4.72 E 10.16 S 5.17 E 0.00 -.41 -1.P'~ '2' .~ -3.16 . '~.70 -5.20 -5.32 -5.38 1099.91 ....... 1_o5p .8 + .s ........ s_3._P .69 w ~199. c! 11~0.R~ 0 ~ N 2~,29 ~ ] 299.91 1230.~q 0 19 S 1.10 E 15~° °l 1330.84 0 13 ~ ql. .... . ............................ o 60 W lqqg.ql 1430.84 0 19 N 8q.70 W 15qq-~l 1530,8A 0 q2 S 0,10 E 1799.90 17~0,8~ 0 25 S 50,50 E lSgq.gC 1R30.85 0 22 S 82,59 E 1999.8R ...... ~3.p,21 ......... 1 23 .........~ 42,79 E 2099.77 2030.70 3 57 N 33.29 E 2199,3~ 2130.27 6 33 N 13.89 E ,2_2~8,.~}.~ ...... ,¢2~?._23 ..... 9 56 N 22,39 E 23q6,27 2327.20 ~'~ 8 N 25,7'9- E 2~92,90 2q23.R3 16 36 N 30.60 E 25¢7,75 ...... 2~_~ ....... 20~1.7 ....... ~_.3.~.,20 E 2680,90 2611,~5 22 19 N 31,60 E 2772,61 2703,5~ 2~ 35 N 32,59 E 2~62,77 .. ~Z~3~_~O .... ~.~__.37 N 51.89 E 2951.0~ 28R1.97 29 25 N 30,89 6 .36 .09 .37 ,22 .26 .RO 10.38 S 10.38 S 10.62 S 11.05 S 11.18 S 11.76 S 12.61S g.38 5.33 5.32 5.19 -5.47 -5.67 q.78 E ~.50 E /~ · ~+ 7 E -6,~3 -7,07 -7.79 .2q .53 1.22 2.58 3.11 3.59 3.27 3.68 3.68 2.05 2.29 2.06 2.83 13.15 S 13.~8 S 12.63 S 8.85 S · q4 S 13.08 N 31.50 N 53.85 N 80.99 N 112.00 N 1~5.71 N 1R2.26 N 222.37 N q.61 E 5.11 E 6.26 E 8.98 E 12.2q E 16.°0 E 25.1A E 37.37 E 53.63 72,57 E 95.73 E 116.7~ F lql.2q E -6.78 -2.12 6,65 20.~0 qO.06 65.5q 97.11 133.38 173.13 216.30 263.I9 ................................. AP~'R~YJSU'N-WEL-[-N..,~VF~YING COMPANY ANCHORAGE, ALASKA SOHIO ALASKA PFTROLEUM COMPANY d-l$ '¢sEcg--TllN R]3E) ......................................... ~b~FCtJYATION DATE PRUDHOE 6~Y OCTOBER 7~ 1980 ALASKA TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL DATE OF SURVEY OCTODER JOB NUMBER BOSS-16674 KELLY BUSHING ELEV. : 6, 1980 69,07 FT. DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST ~[RTIC~L SECTION ~200 3123.06 $053,99 31 46 N $1.70 E 1,04 $09,27 N 3~00 3207 30 3138 23 ~3 24 N 31 50 E 1.64 ~55.15 N S4'~0' ' 328~.33 3220;~ ....... $6 21 N'-$~.10 E 3.06 ~0~.2'8 N 3500 3368.76 3299.6~ 38 26 N 29.79 E 2.09 ~56.90 N 3600 3a45,a9 $376,82 ~0 35 N 29,89 F 2,22 512,55 N 5700 3520,73 3~51,~6 ~2 29 N 29, 0 E 1.90 570,37 N 3800 3593,~2 3524.75 4Z 34 N 28.79 E 1,10 630,11 N . 19~,62 E 565.00 222.8~ E 252.09 E 282,~1 E 536,30 313,58 E 599.62 345.67 E 665.57 37~.65 E 733.43 3900 3666,06 3596.99 43 54 4000 3738,32 3664.$1 ~3 27 '4100 3810.94 3741.47 43 31 4200 3883.62 3814.55 43 14 400 q030.97 3961. 500 q105.21 a036. 700 4254.35 4185. PO0 4329,56 q260. 0oo ~81.15 ~1~. 90 ~2 12 14 ql 5~ 61 ......... 41'~--q~9 28 ~1 32 ~9 qO 5~ 08 40 28 ~00 4557.3~ ~88.27 ~0 300 4710.92 4641.85 39 26 N 32 qO0 4788.30 ~71o.23 39 9 N 33 500 ..... 4~65.°3 479~'.86 ...... 36 0 N 3q 600 Agq3,77 q~74.70 38 45 N 3~ 700 5021,68 q952,61 58 53 N 3~ PO0 5099.27 5030,20 39 20 N 35 900 5176.~ 5107.37 39 37 N 35 N 28.50 E .39 690,79 N N 28.70 E .48 75i.~3 N N 28. 0 E .49 811.99 N N 28.60 E .50 872.~7 N N 29.89 E 1.25 95T~74 N N 29,79 E ,16 ggO,lO N N 30.29 E .45 1048.09 N N 30, 0 E .~2 110'5-~'~]~-i~' N 50.50 E .43 it63.25 N N 31.89 E 1.12 1219.63 N N 30'.-~-g E ,68 12~'~'-~ N N 32, 0 E ,77 1550,95 N N 32. 9 E .22 i385.8~ N ~11.80 E 802.17 444.86 E 870.81 477.54 E 939.18 510,10 E lO07.ql ~4~.-79--E 576,78 E 1142,03 610.32 E 1208.7~ 677.55 E 1341.59 711.49 E 1407.35 779,50 E 1537. 813,87 E 1602.25 .40 E · 0 .20 ,qO .90 ......... 8'~'~'. 20 "' E ........... 16~g-i~SP- 882,47 E 1730.24 916.78 E 1793.54 951.67 E 987.04 E 1919.33 1022,68 E 1982,02 1058.82 E 2045.1f · 0 E .40 1494.04 E .38 1547.28 E ,77'' ' 1~49"i79 E ,29 1651.65 E ,3~ 1703,21 E ,46 1754.93 · 7O E · 50 E · 53 1806,80 · 13 1858,66 .79 E 19 1095,62 E 2108,70 N 1132.75 E 2172.48 N ' 1169.'9-~ ..... E ..... SOHIO_ ALASKA. pETROLEUF~. J-13 (SEC9 Ti1N R1 PRUDHOE PX~Y ALASK~ MEASURED VE. DEPTH COMPANY SPERRY-SUN WFLL . /,VEYING COMPANY ANCHORAGE, ALASKA c-O~-PU~'A T 16DI D A T E OCTOBER 7, 1980 PAGF ,; · OA_T.~_OF SU.R.V_E_Y__.OC. TOBEF._. 6,,1, _I980_ ,BOSS GYROSCOPIC SURVEY JOB NUMBER BOSS-16674 _K. E LLY__EU_S ~]1N_G_E LE_V_, =__6_?_. 0 ?_ F T. OPERATOR-MIKE GARY .T R U [ _SJJ B - S E' A ..... RTICAL- ..... VERTICAL INC EPTt~ DEPTH D ~.COURSE ......... LINATION BI [G MIN D OUR SE RECTION SEVERITY EGREE? DES/lO0 T OLA_ k_ RECTANGULAR COORDINATES VERTICAL NORTH/SOUTH EAST/WEST SECT ION 6200 6300 6400 6500 6600 6700 6~00 6900 7000 7100 7200 7300 7400 7500 5484,29 5~ 55~0,75 5~ 5636.52 55 5712.02 5642.95 57~7.12 5718.05 5~62.00 5792.95 5936.83 5867.76 6011.~8.6~ 5942.7~ ......... 6087.17 6018.10 6162.60 6093,53 6238.12 6169.11 6313.61 6244.54 ~388.37 6319.30 ! 760 770 7~0 790 7~5 800 P, 05 HiO 815 0 6462,25 6343,18 42 43 N 0 6535.36 6466,29 43 19 N 0 6607.80 6538.73 43 49 N 0 6679,86 6610.79 ~3 58 DJ 0 ¢,715.90 6646.~,5 43 A7 N 0 6751.8~ 6682.77 q~ 17 N 0 6787.40 6718.33 45 I N 0 ...... 682~;4'0- 6753,33 "'--46 ...... 7 N 0 6856,57 6787,50 ~7 3~ N 35.40 E 35.29 E 35. 0 E 35.50 F 34.59 ! 34, 9 E 34.79 E 35:..2.9 34.90 E 35. 0 E 35. 9 E 34,79 34,29 E 3q,40 E 34,20 E 34 · 5O E 35. ~ E 36, 0 35.79 F 36. 0 36. 9 E 36.29 E P2OO ~250 8300 8350 ~400 8450 86O 6652.2 688;.17 52 38 N 37.59 6082.08 7010.~5 7038.~2 A5OO 7064.79 0 7114,9b 6913.01 6941.7P 6969.35 6995.72 7045.~8 .39 1962.44 N 1207.12 E 2300.15 .28 2014.59 N 1244.11 E 2364.08 __1,08 2067,35_._N ........ 1.2A$,~! .... E ........ · 23 2120.87 N 1318.45 E 2493. · 44 2174.42 N 1356,30 F 2559,36 _~7~. . 8~_8~4..._._7~N_ ._ L~.21_E ..... 2625,38 · 33 2283.20 N 1431.61 E 2691.66 .47 2337.89 N 1469.13 E 2757.99 · 51 2392.01 N 1~0J~_1~~~824.10 .28 .15 .12 .87 .72 .61 .55 1.29 1.02 1.fig 2.22 3.03 3.93 24A5.84 N 1544.g3 E 2889.89 2A99,65 N 1582.54 E 2955.54 2553.~ ~ ~ __16~09~ 5 F ~0_21_.02 2607.07 N 1657.76 E 3086.67 2661,77 N 1695.41E 3153.0A 27]7,40 N 1753.44 E 3~0.46 3.47 2.~3 5A .... } ..... N 36.79 .E~ __~.].8 ............ 3.~55~.2p_~_____ 55 40 N 35,90 E 3.56 3188.13 N 57 24 N 36.29 E 3.50 3221.83 N 58 55 N 36.40 E 3.04 3256.04 N 60 51 N 35.70 C 2,03 3325.97 N 2773.77 N ]771.A9 E 3288.6g 2830.68 N 1810.78 E 3357.62 2887.61 N 1850,35 E 3426.96_ 2915,81 N 1870,51 5 3461.~ 2943.97 N 1890,89 E 3496, 2972.~ N 1911.49 E 3531.51 3001,31 N 1932.51 E 3567.20 3030.76 N 1954.06 E 3603.69 3060.95 N 1976.32 F 3641.19 30ql.88 N 1999.34 E 3679.73 3123.25 N 2023.15 E 3719.08 ~93_7__.__~_0___E. 3_75 9 . 16 2071.63 E 3800.03 2096.21 E 3841.73 2121.38 E 3g84.19 2172.28 F 3970.67 SOHIO ALAFKA PETROLEUM COMPANY J-13 (SEC? TliN'Ri~E) ...... PRUDHOE bAY ALASKA $1SEpRY-SUN WFLL-'SUPVEYING COMPANY ANCHORAGE, ALASKA COMPUT A T I o K'-[TA'T E OCTOBER 7, 1980 -'-PAOE. '4 DATE OF SURVEY OCTOBER 6, ]980 --F~O~S' 'CYR'OSCO~IC-'SURV~¥ JOR NUMBER ROSS-16674 KELLY RUSHING ELEV, : 69,07 FT, 'O-F~ ¢, R~A'Y 0 D-zHT~-'~-~-R Y F~E A'SU DEPTH RED TRUE SUB-SEA COURSF V~RTICAL ..... VERTICAL ..... INCLINATION DEPTH DEPTH DE'G COURSE I RE C'i' I ON DEGREES DOG-LE'G TOTSL DEG/iO0 NORTH/SOUTH OP,-D'I N A~F E'S-~V F DT I C A L EAST/WEST SECTION 8800 7214,10 7145.0~ 8900 7265,68 7196.61 H950 7292. HH .... :7225, al 9000 7321 · 87 7252,80 9050 7352 · 36 72 A3 · 2r; 9150 7418.1~ 13Ag. OF, 9200 7A52,35 7~3,28 ~00 75P9,89 7520,R2 9500 7659.25 7590,18 9600 772~,21 7C60,1A 9700 7~01.25 77¢2.1R gRO0 787q.95 7805.88 9900 79~8,8~ 78~¢,7~ ~0000 8022,88 7953.81 lOlO0 8097, O~ RO2?.m4 10200 .... 817~,I1- 8102,04 10300 H245,19 8176.12 iOA O0 8319.59 8250,52 10500 P3 10~00 10700 P5 ~oHoo .....~¢62~.¢D ....... ~5~-,~ ......... 59 ....... ~ N 10~00 8700.99 8631,92 37 0 ~000 ......eT~t.G7 H7~2.60 11200 ~g46.GA 8877.57 33 15 N 11300 9030,88 8961,81 31 5A N 66-'-2~ ..... ~736, 0 E 59 33 N 36,40 E 5~ 20 N 36.20 E 55 ...... A'3 ..... ~-~gi-7"~ E 53 24 N 36.20 E 51 26 hi 36.59 E A.'5~ ..... 7315.~ ...... ~F~-'-28 ...... ~' 37.59 F 47 1 N 37.59 E 46 37 N 37.A0 E 4~ 42 N 36.59 E q6 10 N 38.20 [ ~5 59 N 36.70 E A2 36 N 36.40 E 42 25 N 36.59 E ~2 13 N 36.29 42 5 N 36,59 ~2 ...... i6 ....... N-3~;V6 ~2 7 N 37.29 41 43 N 37.29 · 57 3396.59 N · 86 3466.45 N 1.23 3535.~9 N 5.3fl 3569.20 N 4.74 3G01.94 N 3.97 3633.83 N 6.11 3664,36 N 2,90 3693.69 N.. · 87 3722,6! N 1.27 3R38,26 N 1.10 3895.A4 N 2223,31 E 227q,A3 E Aiqq,32 2325,1~ --23~0.09 E 4P-71,8~ 237~.32 E ~312,60 2397.83 [ 4352,20 2'~'O.~i'"E A390.Ab 2443.A9 E A427.~2 2465.69 E 4463,R4 2553.~6 F 4608,ql 2597.26 E h6RO.87 26-E3'~F.~l E ~752,2~ 2680,76 E ~821,62 2720,97 E ~8~9.17 2801,17 E 5023,72 .83 1.05 2.60 4008.80 N · 23 4063.13 N · 1-'~----'~-i'i-T71 ~--N · 27 4171,23 N · 25 ~225.22 N 2841.05 E 5090.R1 .28 --~ 2 ~-T. 0-2- N'----iFE~-i-;~'3--E51-5 ?. ~- · 31 4332.60 N 2921.75 E 5225.b., · 40 ~385,7~ N 2962.23 E 5291,R0 ~90,29 N 30~3,76 E 5~2~.1~ 4540.°6 N 308A.72 E 5~89.19 ~ o";"¢ 9 E 43,70 E 43.20 E 43. 9 42.59 ~1,50 1.57 2.73 1.61 q6L55.49 N 5166.98 E 5613. q678.37 N 3207.61 E 5672. N 40.79 .92 1.28 1.4~ 4720.17 N 3246.R0 E 5728. 4761.03 N 3284.70 E 5784. ~801.02 N 3320,79 E 5837. 1.06 4840.29 N" 3'~)5.12 E 5~-~-9. 90 10 5~ SOHIO /~L/.,'~-kA PETPr)I_EU'~ d-13 (SE(_'' TllN Rl.~E) PRU[;HOE {',AY ALASKA C 0 M P A N Y TRUE SUP-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DFPTH 11500 9202:2~' 9l.',3.22 11600 9288.9.5 o219.~tR ] 1 ZOO .q376,31 9307.24 iiRO0 9q64,15 9595.08 HORIZONTAL DISPLACEMENT = THE CALCULATION PROCEDURES ARF SPEqRY-SUN WELL SURVEYING COMPANY ANCF!ORAGE, ALASKA COMPU~TATION DATE OCTOBER 79 1980 PAGE D.A_T.F.._ _0 F __S U R V E X_ 0 C~ LO [I_E.R~__6.,__ 1 9 ~ 0 BOSS GYROSCOPIC SURVEY JOB NUMBER BOSS-1667A KELLY._.E~U_$~I.NG_EL[V_~ : 6~_, 07_ ET · OPERATOR-MIKE G&RY COURSE COUR%E DO~-LEG INCLINATION DIRFCTION SEVERITY PECTANGULAR COORDINATES VERTICAL DE6 MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 2°. 40 N AO,20 F ,53 4917,03 N 3~20,43 E 59R9,69 28 32 N 3q.40_ [ 1..,.lg__~OEq,qO._N ........ 3_~5~_~7 E 6038,~ 28 32 N 39,40 E 0,00 4991,33 N 3481,91 E 60$5,~ 60 .P, 5 · 81 F E E T A_T._ DJ Q_R T~H_t.._=3 ,4 _0~ .F__G_, 5_3._~N.._E A S.T_ A_ T_M~ D_~= 1.1_8._Q_O_. BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. SOHIO ALA,' KA PETROLFUM COM~ d-IS (St-C9 TllN R13E) PRUDHOE t AY ALASKA SPERRY-~SUN W['LL ADtCHO P COMPU 1 OCTOFL' bURVEYING COHPANY PAGE: ,~ ~ ^ SKA ATE 1980 DATE OF SURVEY OCTOPER 6, 1'~80 JOB NUMBER BOSS-16674 KELLY BUSHING ELEV, OPERATOR-MIKE GARY = 69,07 FT, INTERPOLATED VALUES FOR KVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASURED VFRTICAL VERTICAL RECTANGULAR COOF~DINAT DE P T H D E~ T H ....... ~ ~"P-T H ...... N'~DP T H / S 6U 1-'H ..... i[ A S T/WE ES MD-TVD ST DIFFERENCE VERTICAL CORRECTION o o.oo -(,,q.o7 o.oo 1-000 .... 6-~9- 9i .........-"~ 30'. 84 ............10.16 POOD ~v99.a8 193o.~1 ~.G~ s 3000 2951.0A 2~G1.97 222,~7 N 5000 AASl.15 A412.08 l~O.g5 6nO0 525~.46 51SA.~9 1 ~58.66 7000 6011.B6 5942.79 2392.01 ~000 67St.H4 6682.77 294~.97 N 9000 '~21., .H7 7252.80 ~601.9a N 11000 H781,67 8712,60 ~678,37 llPO0 9464.15 93~5.0F~ q991.33 N 0.00 0.00 5.17 E .On .Og 6,26 E .12 .03 141,24 E 48.96 fiR.R4 444.86 779,50 1132,75 F 261,6P 212,66 E 518,85 .257,23 E 746,5~ 227,69 1507.10 1890,89 2374.32 2801.17 5207.61 3q81.91 E 989.1~ 2~1.59 E 1248.16 260.03 E 1678.13 429.97 E '~77.1~ ---~-9"~,~ E 2218.33 241.21 E 23s5.A5 117.5~ THE CALCULATION F'ROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. SPEP RY-~'UN SOHIO ALASKA P[ IROLEUM CO~'PA~I- J-13 (SECu T11N R13E) PRUOHO[ bAY ALASKA INTERPOLATFD VALUES FOR &NCHORAGE, ALASKA C 0 ~ P U :l' & T'-I ~-N-'B/{~?~ OCTOBER 7, I 9RO JOB NUMBER BOSS-16674 KELLy BUSHING .~LE.V, = 69~,07 FT. OPERATOR-MIKE GARY EVEN_~IOO_FEET OF ~uAr_~EA_O_EP_TU TRU MEASURED VERTI ['CPTH ~ DEPT 0 O. 69 69. 169 169, 469 ......... b69 569. 66~ 669. 769 769. 869 869. 969 969, 1069 1069, 1160 1169, 126q 1269 · 1~69 1469 1A69. 1569 1569. 1669 1669, ..... 1769 _~ 1769. E SUB-SEA CAL VERTICAL H DEFTH TOTAl_ RECTANGULAR ~ _C~OORDINATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE V E R T .I C_A_.L CORRECTION O0 -69.07 O7 0.00 07 100.00 07 200.00 07 300,00 07 400.00 OZ .........500.00 07 600.00 07 700,00 07 POO.O0 07 900,00 07 1000.00 07 1100,00 07 1200.00 07 1300.00 07 1400.00 07 1~,00,00 07 1600,00 07 1700.00 0,00 0,00 .lq S .08 W 1.01 F .27 W ......... 2.57 S ............ A.15 $ 1,0~ E 5.65 S 1.39 E ........... 6,.81 S ................. 1.,~4 E ~.12 g 2.68 E ~,08 S 3,71 F 9.65 ~ 4.59 E 10.05 S 5.02 E 10.56 ~ ~ 5.~0 E O,O0 .00 ,01 _,3_~ .... ,0~ ,05 .0_6 .07 ,Oa ,0~ ,09 .00 .01 __01 ,01 ,01 ,3.! ,01 ,01 .01 .00 ,00 lO.A5 S 5.31 E 10.96 S 5.27 E 11.38 S 4,50 E 12,~6 S q,q9 E .... 12.97 S .......... 4.51 E .09 .09 ,0'~ .10 .10 .00 .00 .00 ,_0.0 ,00 .01 ,00 SO~IIO PRUDHOF [,AY ALASKA $ L L'_,K A PFTP OL[L'PI Ti1N Ri3~ ) INTERPOLATED SPFF,,'RY-$UN WLLt.' ~.,-F~-F'~-'~G ~ N C H r~' "', '~-; K A ~OMPU t ~ ~ ~. ~.,i uA I E OCTOBER 7, I980 COMPANY PAGE' DATE CURVFY OCTOBER 6, 1980 JOB NUMBER BOSS-1667~ KELLY BUSHING FLEV, : 69,07 OPERATOR-MIKE GARY VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MFASURED VERTICAL VERTICAL D~PTH DE~ .............. ~EPTH 1Boq 1B69 07 1~00 O0 196~ 1969.07 1900.00 20 .07 2000.00 P1Gg.07 00.00 2270 226~';0'~ ...... 2200.00 2572 2569.07 2500.00 24~$ 2469~0~ ....... _ 2560 2569.07 2500. O0 2687 2~69,07 2600,00 2796 2769,07 2700.00 2907 2~69,07 2~00,00 5020 2~6q. 07 2n00. RO 3136 3069.07 50 O0.00 3254 316~.U7 3100.00 3574 3269.07 3200.00 3500 3369.07 3~00.00 3630 3~69.(37 3400.00 5765 ~569,07 5500,00 TOTAL RECTANGULAR COORDINATES NbRTH/SOUTH MD-TVD EASI/WEST DIFFERENCE' VERTICAL CORRECTION 13.46 S q,91 15.18 S 5,75 10.42 g 7.93 E 3.5A S 11.35 E 8.59~ 15.1~ E 25,79 N 22.53 E A7.~8 N 33.92 E 75.20 ~' 50.13 E 107,~6 N 70.02 E ~A.3A N 92.8~ F fB~.98'N 11H.47 E 231.10 N 146.47 E 281.08 N 177.19 E 3~3';-73'N 209.70 F 591.59 DJ 244.69 A57.11N 28P.53 E hOg.aa N 367.31 E 693,34 N 413.19 E .10 .11 .18 1.30 3.06 6.12 11.06 18.14 27.03 51.~3 67.57 .00 .01 .07 .31 .82 1.75 ~.06 4,94 7.08 8.89 85.18 105.91 131.33 161.~6 10.96 13.64 15.94 17.61 20.73 25.42 5o~ 13 196.77 235.11 35.31 38.34 SPERRY-SUN WFLL . _dVEYING L ArJCtlORaG[, ALASKA SO~tIO ALA,S~,A I-'FTROLFLiI~ COF'~ ANY d-13 (SEC9 T11N R1 3F_) COY, F.U PRUDHOF I~AY OCTOPF COMPANY JOB NUMBER BOSS- P/~GE 9 ALASKA .... .K,. E L LY__ P U_S__H_I._b G._._E_L..E V OPERATOR-MIKE GARY : 69.07 FT. INTERPOLATED VALUES FOR EVEN_iO.O_FEET OF SUB-SEA DEP~_~ .... MEASURED DEPTH'~ 4180 4316 45R5 4719 ~a52 5115 5245 5375 550A 5652 5760 6020 6150 6280 6410 TRUE .~'UP-SFA TOTAL VERTICAL .... VERTICAL ...BEC~ANGIJLAR~. CQQ~.~NATE£ MD-T.~D [,EPTH DEPTH NORTlt/$OUTH EAST/WEST DIFFERENCE 576.9.07 37 5HF9.07 3H .,g69.07 ~ 069.0_7 ........... ~_o A169.07 41 4269.07 4364,07 4569,07 4~69,07 46 4769.07 47 4~64.07 4t) 69.07 49 5069.07 5169.07 51 5269.n7 52 556q.07 53 5469.07 54 5569,07 55 VE.R_T_!CA_L CORRECTION 00, 00, 00. Of) . 00. 00. 00. 00. 00. 00. 00. ~0. 00. [lO. 00. 00. 00. O0 776.94 N O0 860,q6 N fin 941.29 N OD 1020,04 N O0 1097.58 N O0 1174.49 N O0 124R.71 N On 1322.20 N O0 1394.25 N O0 146~.98 N O0 1534.14 N O0 1~01,9[l ~I OD 1668.A0 N O0 ]75A,65 hJ O0 1P01.84 N O0 1~69.1~ IJ OD 1936.5P N O0 200~.~1 N O0 207~.2l ~ 458.82 E 505.55 E 5~P.7~ E 593.96 E 273.21 38.10 310.96 37.76 347.2~ 36.32 382.34 35.0~ A16.69 5~.35 450.59 33.90 %83.2o _._3_~ o 515.05 31.~5 639,10 E 683,97 E J29.51 E 774,04 E 819.15 E 863.90 E 90[{,25 E 953.10 E 998,5! E 1044,62 E 1092,06 E 1140,25 E ,118R.57 E 1236,83 E 1285.19 E 546.30 31.25 576.70 30.a! - _ -- 606.12 29.~2 634.9~ 28.85 663,37 28.39 691.88 2R.51 721.36 29.48 75l_~.2_0__ .......... 2~SA 781.01 2~.80 ~11.18 30.17 8417.?_g ......... 30.72 SISFRRY £UN WELL /~NCt-IORAGE, AL ASK/~, SOHIO ALASKA PETROLEUM CONIPANY d-13 (SEC9 TllN R1 3E) PPUDHOE PAY ALASKA C OM'~ U T-A l' OCTOBER 7, 1980 COMPANY PAGE. 10 DATE OF SURVEY OCTOBER 6, 1980 ,JOB NUMBER DOSS-1667~+ KELLY BUSHING E'LFV. OP~FFA-Y O'R-=H-It~F-d A-R Y = 69.07 FT. INTERPOLATED VALUES FOR FVFN IO0 FFET OF SUB-SEA DEPTH TRUE_ F:LJB-SEA TOTAL MFASURED VE,RTICAL VERTICAL RECTANGULAR COO DEPTH- E FPTH .............. b~pTt~ ..... NO¢~ITH/SOU'I='t-i ...... RDINATE'$ MD-TVD VERTICAL F~-T-£~ Y~ D FFFFP,TNC'~ CRDI~ ~ F. CT tON 667.5 576n, 07 570 6809 5H69,07 580 6c) 4 5 5c'69,07 590 707.5 6C, 69,07 600 720H 6169,07 610 7340 6269.07 620 7474. 6369.07 630 7609 ~A69,07 640 0,00 2143.91 N 133~.59 E 0.00 .......... 2~i5.33' N 1385.1~ E O.O0 2288.38 N 1435,12 E fi. O0 2361.36 N 1485.~6 E 0.00 2432.90 N 153%,90 E 0.00 2504.2~ k' 158~,.76 E 0.00 2575,13 N 1635.51E 0.00 26A7.40 N 1685.61 E 0.00 2722,60 N 1737,00 E 7746 656a.07 6500.00 2gO0,Oq N 1785,79 E 8024 6769,07 6700 O0 2957.65 N 1900,76 E ~.1~) .... G~6~.07 6F~oo.no 304~.q9 N 1~6~.25 F 8327 69Ag,~'~ ....... 6900,-00 ............ ~i~'~V~'N .... ~56,70 E 8508 7069.07 7(100.00 3261.75 N 2125.60 E ~7~0 71~.07 7]00.00 3~0~.75 N ~22P.51 F R906 ...... 726~o'0f ........ ?200-,00 ............. 3-5~9';'R3-~ ..... 232~t.3~ E 9076 7369,07 7300,00 3650,10 N 2~10,03 ~ ~224 _~46.~.~ ........ ~..0O .... 37~6,67 N 2476.4~ E 873.95 32.06 9AO.3R 33.55 97~.0l 33.6~ 1006.91 32.~0 1039,~9 . 32.58 1071.7R 32.29 1104.95 33.17 1140.21 35,26 1177.29 ~7.08 1255,04 39.11 1299,56 44.52 1A39.22 80.36 154~.1t lol.S9 lg~ ?.3o '~Fff9 1707,25 69.95 1755,28 48,03 SOHIO ALr~St<A PLTROLEUM J-13 (SEC9 T11N R13E) PRU[)HOE F~/~Y ALASKA C 0 M P A N Y SPEFRY'SUN WELL SURVEYING COf'~PANY ANCHORAGE, ALASKA OCTOBER 7, 1980 PAGE'11 ,JOB NUMBER B0SS-1667~ K E_L_L Y_..R U ~H_I_N_G_[L~_V_,_~ .-- .... 6.9_,0 7_F T, OPE. RATOR-MIKE G/~RY t ........ I.N!ERF'OLATED VALUE TRUE SUB-SEA TOTAL M. FASURED _ VERTI_C. AL ..... yF.R. TICAL. ~ . RECTANQ.ULA. R_ ..... C_C)_O_R.D!_NAT.[_$_ M_D_-_'LV__D~ ...... DEPTH DEPTH DEPT~ NORTH/SOUTH EAST/WEST DIFFERENCE YE.RTICAL__ CORRECTION a$6° 7~'6r~., . o07 7cOO,fl0 9514 7F 69,07 76U0. O0 9655 7769,07 7700, 00 9792 7~69.07 7H 00. O0 9927 7969,07 7900,00 10062 8069,07 ~000,00 10197 P 169._0.~ ...... 8100.00 10332 2269,07 8200.D0 10466 5369.07 ~300.00 10599 8469.07 B400,O0 10751 r569.07 RbO0.O0 10R59 ~669,07 8600,00 lOqSa H76m,O7 8700, O0 ]'liO~ ~'~ F~6~.07 PPO0.O0 11226 r~a69.07 8400.00 1134~ 0069,07 9000,00 11461 '916~,07 9100,00 11577 92~9,07 9200,0P 1_1~91 .... "9569,0 7 9~00,00 3~21 · 2 I__N 3003.60 N 260., 3984.46 N 2662 .__A_~59,H1N 2717 q1~1,91 N 4~04,~ · 96 .~2Z~_.5~ N ....... 2880.12 ~49.78 N 2934.R3 4420.74 N 2989.01 q490.11 N 304Z.61 4556,62 N 3097,40 4617.66 N 520].~8 524~.$6 ~294.66 ~556.52 3375.68 3~13,12 3~49.07 4671,83 N 4722.90 N 4771.85 DI 4818,~2 N ~86~,20 N A908,38 N 4451,35 N · 05 F · 34 F · 85 E · 76 E 2772,16 E 2826,00 E 1845.07 44.20 1R86, TR 41,72 1~_~_6 ........ 3_6.~1~ 1958.24 35,29 1993.28 2063.i3 34.95 2097.i8 34.05 2130.58 33.q0 2162,18 31,60 2190,7~ 28,57 2215,~7 24.73 .... 22~7,5~ 22,07 2257,75 20,21 2275.g0 1R.15 2292.49 16,59 2308,05 15,56 2322.6~ 14,63 .................... ,~PERRY--~UN WELL SuF,-V'EYIN6 ANCItORAOE, ALASKA CC)MPUYT~TI o~ OCTOBER 7, SOHIO ALAgK/~ t'ETROLFI~H COMPANY d-15 (SEC9 TllK' P1 PRUDHOE dAY ALASKA COMPANY PAGE-12 DATE OF SURVEY OCTOBER 6, 1980 JOB NUMBER BOSS-1GGTA KELLY BUSHING ELEV. = 69.07 O-~E ~-A-T O-F--M'! 19eo · FT, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH MEASURED DEPTH 11800 TRUE SUg-SFA VERTICAL VERTICAL DEPTH TOTAL RECTANGULAR COORDINATES NORTH/~OUTH .... EAST/WEST MD-TVD O I F F E R E N-c-~' 9464.15 9395,08 4°91.33 N 3481.91 E 2335.85 VERTICAL C6FRFCY-z ON 13.16 T hE CALCULATION PROCEDURES USE A LINEAR THE ~'EARFST 20 FOOT ~F) (FROM R/~DIUS INTERPOLATION PETWFEN OF CURV/~TUR[) POINTS , ' } ~ , I t ' ~ ~ i ~ , ~ I S~~,,~d Date' ~ ' ~ t tI~ ~ i ~ Iii, ., ~, I .... ~ j -' .... -.~- ~ ..---~-[ · ' ,, i ~ ~ i ' I ' i ,, , ~ , ' q ..... , ' I i .... ', ~ ' ' . ~ ~ ' , ' ~ i I [ ' ----~ ...... ,, Check Form for timely compliance with our regulations. Operator, Well Name and Number Reports and Materials to be received by: //-3- Date Completion Report Well History Samples Mud Log Core Chips Core Description Registered Survey Plat Inclination Survey Directional Survey Drill Stem Test Reports Production Test Reports Logs Run Digitized Log Data Required Date Received Yes Yes Remarks Yes CURVE DATA LOCATED IN THE APPENDIX SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 SOHIO--BP ALASKA PRODUCTION DIVISION ARCO TO: EXXON PHILLIPS REFERENCE' SOHIO LIS TAPES ~~The following material is being submitted herewith. Please acknowledge receipt by sig copy of this letter and returning it to this office:-- MAIL: POUCH 6-612 ANCHORAGI .0, ' , ~ RES ENG,/~ lOllel8~ ~ -~~ 4 ENG ~ ~ 1 ~E~ - i 3 ~EO~ ~STXY-~ J~TAT ?~ .... I" CoN-FE~: J-13 LIS Tape 9/28/80 #1&2 t/61030 Carol Kriet~~' Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265~000 MAIL' POUCH 6-612 ANCHORAGE, ALASKA 99502 October 7, 1980 CONFIDENTIAL Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well J-13 (22-03-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of September, 1980. Al_~.~soe~clo~e~..are__/h~ee copies of the survey plat showing revised ...... surface location. ~.......__ ~ , , ,. . , Yours very truly, District Drilling Engineer RHR:ja Enclosures cc: Well File 917 Form No' 10-404 REV. 3-1-70 ( ~r f SUBMIT IN DUPLICATE ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE 50-029-20497 6. LEASE DESIGNATION AND SERIAL NO. ADL 28281 Sohio Alaska Petroleum Company Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, Alaska 99502 J-13 (22-03-11-13) 4. LOCATION OF WELL At surface: 1048' SNL, 804' WEL, Sec. 9, TllN, R13E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Ba¥~ Prudhoe Oil Pool 11 SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 3, TllN, R13E, UPM 12. PERMIT NO. 80-83 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. September, 1980 Spudded well at 1200 hours, September 7, 1980. Drilled 17 1/2" hole to 2686'. Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2668'. Cemented with 3720 cu.ft. Arcticset II cement. Installed and tested DOPE. Drilled out to 2670', ran leak-off test to 0.64 psi/ft, gradient. Directionally drilled 12 1/4" hole to 10786'. Ran open hole logs. Ran 276 jts. 9 5/8" 47# L-80 Buttress casing to 10780'. Cemented in two stages: First stage with 1535 cu.ft. Class G cement; second stage through D.V. packer at 2603' with 130 cu.ft. Arcticset I cement preceded by Arctic Pack. Cleaned out to 10737', tested casing to 3000 psi, okay. Drilled out to 10810'. Performed formation competency test to 0.7 psi/ft. gradient. 14. , hereby ce~ th~at~ tr~ue and ~ect SIGNED %~ %~x.~% ~a ~ TiTLEDistriot Drilling Enginee~ATE LO · ~ ~ ' ~ ._ .__ _ NOTE--Report on th~ ~rm is required for each cal~dar month, regardle~ o( the ~atus o~ operations, and mu~ be filed m duplicate with the oil and gas conservation committ~ by the 15th o~ the succe~ing month,unl~ otherwise dir~t~, IO I zo ~o 40 5 ..... (Refuel) , ,( 2O 50"' ~ 40 _ · 005' ~ ( Actual ) I0 20 ~ 3BI' , '~1 ' 2280' d-13 (Propostd) (Actual} -- - d - 12 f(Propotld ) ~ -! ' ~~- .... ,.,o.o..) -~-.~' . , Lot. = 70°19'$7.82' , ~. Lon~148o~O'08 98" Y= 5~970,605 !1 CERTIFICATE OF SURVEYOR I hereby cerlify that lam properly registered to practice land surveying in the S1ate of Alaska and 1hal this plol represenls o Iocolion survey of lhe wellpod shown and fha wells thereon. This survey wosmode by me or under my supervision end oil dimensions end other deloils ore correct, Bollom hole locations are furnished by others. Dale Surveyor NOTE: All bottom holes ore 8800' sub sea. PAD DETAIL SCALE' I"= 300' PORTION T. II N., R.13 E. SCALE-I": I/Z MILE PAD "J" EXTENSION Located in REVISED SURFACE LOCATIONS J-Ia, J-Il, J-Il:, J-IS LAB 8/4 /BO ADDED PROPOSED BOTTOM HOLE J-IS CJR &/lB/BO REVISED PROPOS£D BOTTOM HOLE: J - I! FROM 680' TOESO' SNL, FROM 50' TO75'W£L PJR REVISED PROPOSED BOTTOM HOLE J~-12 FROM 780' TO BO0' WEL PJR 1/21/80 · I I L I I II I " I I I ~ NE I/4 P~:) rRA~TtD S&.C_9_~TII~Nj ~,_~ E_j_U_.MIAT MEmO,AN ALASKA Surveyed for ::SOHIO PETROLEUM COMPANY _ .,. Surveyed by F.M. LINDSEY Bi ASSOC. LAND 8 HYDROGRAPHIC SURVEYORS 2502 West Northern LIght~ Boulevard ~ox 4-081 Anchorage ' AIosko i i i i i i i i i ii i i i1 ALASKA OIL AND GAS CONSERVATION COMMISSION Thru: Hoyle H. Hamilton /~~ Chairman/Commi s s io ~. Lonnie C. Smith '/ Commisaioner Doug Amos ~/~'~~ Petroleum Inspector October 2, 1980 Witness Retest of wavied BOPE test on Sohio ' s J-13 Well, Sec. 9, TllN, R13E, UM. Permit No. 80-83 on Nabors Rig 18E. Thursday Sept~r..25,..1980~ After testing the BOPE at Brinker- hoff Rig I I traveled to Nabors Rig 18E to witness the BOPE test. The test commenced at 12t30 pm and was concluded at 5530 pm. I filled out an AOGCC BOPE Test Report, it along with a copy of the operators BOPE report, for the test waived on September 9, 1980, are attached. In summary, I witnessed the BOPE test on Sohio's J-13 well on Nabora Rig 18E. I filled out an AOGCC BOPE teat report, it along with a copy of the operators BOPE report for the test waived on September 12, 1980, are attached. DA=mm o~s 4/8.0 Inspector STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Da te ",~'PT- "~.5,,,/,.,~,~ Well ..3-/..5 Operator ,,,~O1-¢/¢ Well Location: Sec ~ T II~ Drilling Contractor Location, General Well Sign General Housekeeping Reserve pit Rig 0~" BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Test Results: Failures Test Pres sure '2 5~2o0 Representative Pe rmlt # e~Sfaslng Se~ ~ /~~ ~ ft. ~zg # ]~ Re~resentatiw. ~/~-& ACCUMULATOR SYSTEM Full Charge Pressure ~(D~ psig Pressure After Closure /~P~ psig 200 psig Above Precharge Attained: min /~ sec Full Charge Pressure Attained: ~ min /~sec N2 2/~5~ ~;1'/5~ '"~l.,,~j ~/~5 psig ~ Controls: Master ~/C Remote ~P~ Blinds switch cover ~ Kelly and Floor Safety Valves Upper Kelly. ~/~ Test Pressure Lower Kelly'B'~ Test Pressure Ball Type ~f Test Pressure Inside BOP ~ Test Pressure Choke Manifold ~ Test Pressure No. Valves /~ No. flanges Ad~ ustable Chokes Hydrauzcally operated choke / ~ Test Time ~ hrs .... ~ Repair or Replacement of failed equipment to be made within days and Inspector/Commission office notzfied. Dis tribut~on orig. - AO&GCC cc - Operator cc - Supervisor Inspector , (' DATE c)_/2_-- BP ALASKA INC. 30P EQUIPMENT TEST RER R~G . , /~'~-- WELL ~-,,L~ TEST FLUID [~1'~'~ ! ACCUMULATOR VOLUME / ~0 ~.~ ] TEST TYPE: ~WEEKLY ~FLANGE UP D C~Ne SET , LAST CASIN~: ~."AT ~?~ . PRESSURE ~ PERFORMANCE TESTS~ IMANUFACTURER AND TYPE, SIZE OF RAMS, ETC. BOP STACK-- LIST ALL ITEMS TOP TO BOTTOM, · , ACCUMULATOR ACCUMULATOR ONLY TEST TEST 8~ PUMPS. . . CLOSI NG CLOS I N G RECHARGE UNIT PRESSURE T I ME TI ME T I ME TI ME ANNULAR -m..,.~oO ,, /,~'" ,~;~,. .,~.") .5~c , BLIND RAM ~0 ~ " , , , PIPE RAM, ,~Oc3 ~" ~ _~,,~ ~ ~C¢ ~,,~r CHOKE MANIE ~o~ ~~ ~]~e TEST TOOL: ~UG, ~CUP~ ~PACKER~.-~'~, KELLY COCK ~ I ~~ , .~ ~;~ CASING TESTED: ~,~-~ FT. TO ~o .PSI KELLY VALVE ~2" ,~0 .~ ~, ACCUMULATOR RECHARGE:,=~.r~ PSI BEFORE TE ' ' ./,~ PSI AFTER CLOSING ALL BO1 INSIDE BOP. '/~[~.l~-~e~ MIN. RECHARGE TIME. KELLY HOSE ~oO ,~ ,, BOP DRILL SEC. STAND pIpE ~o0 ~ ,, TRIP DRILL SEC. . . NITROGEN PRECHARGE: I. CHOKE LINE ~~o ~ ') ~ ~ 5. 6.~ 7. , 8. KILL LINE ' ~~ ~ ' 9 .... I0. I1. 12. 15 .... ,, , , , , , 14 15. ~16 EQ )UIPMENT CHECKLIST YES] NO CIRCULATING HEAD ON FLOOR '~ INSIDE BOP ON 'FLOOR 8t SUBS KELLY VALVES ON FLOOR a SUBS. X s ^.E V^,VE PVT SY~TEM OPERATING ~,,~ FLoW'SENsOR oPERATING X , STROKE COUNTER OPERATING ,,.'~,~/'. TRIP TANK LOCKING SCREWS ON BOP 8~ ALL VALVES OPERATE EASILY. REMOTE STATION oPERATING BOP HANDWHEELS INSTALLED '" GAS SNIFFER OPERATING BARITE ON HAND ~,'~ ~ ,, SACKS GEL ON HAND, 2 ~''~ , SACKS WATER ON HAND ~b-:~) BBL SURFACE MUD VOLUME <XgPE~ BBL HYDRAULIC OIL ON HAND ~.'~' , DRUMS NITROGEN BACKUP SYS ~ NO. OF BOTTLES HOOKED UP~ AT NITROGEN PRESSURE. MALFUNCTIONS 81 COMMENTS (ITEMIZE ALL LEAKS, MALFUNCTIONS, MISSING EQUIPMENT, ETC., AND ACTION TAKEN.) §'P SUPERVISOR: -~ July 31, 1980 Mr. R. S. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-613 Anchorage, Alaska 99502 Re, Prudhoe Bay Unit J-X:3 Sohio Alaska Petroleum Company, l)ern.tt Nc). 80-83 Bmr. Loc. l 6S0'SNL, 804'WEL, Sec. 9, Ti. IAq, R.t3E, UPM. Bottmuhole LQG. s 1710'$#L, 2280'EWL, Sec. 3, 711N, R13E, UPH. Dear Enclosed is the approved application for permit to drill the above referenced well. well samples, core chips and a mud log are not required. A directional lurveYliS required, l£ available, a tape contain-. ing the d~gitized og information on all logs shall Be sub hatted £or copying except experJ3nental logs, velocity surveys and dipmeter surveys. Many ravers An Alaska and their drainage systems have been class~£ied as important for the spawning o~ migration of aaadromous £Aeh. Operations An these areas are subject to AS X6.50.870 and the regulations promulgated thereunder (Title Alaska Administrative Code). Prior to commencing operations yOU may be contacted by the Habitat CooEdinator's office, Department of Fish and Game. Pollution of any raters of the State is prohibited by As 46, Chapter 3, Article 7 and the regulations promulgated thereunde~ (Title 18, Alaska Administrative Code, Chapter 70) and ~y the Federal Water Pollution Control Act, as amended. Prior to Nr. R. H. Reiley Prudhoe Bay Unit J-13 -2- July 31, 1980 co~encing operations you may be contacted by a representative of the Department of Environ~ental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to dril 1. To aid us in scheduling field work, we would appreciate your notifying this office within 48 'hours after the well is s~udded. We would also like to be notified so that a repre- sentative of the cosmission may be present to witness testing ~of blowout preventer equip~ent before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a wi,~ms p~t~. Very truly yours, ~Ham i 1 ton Chairman of BY OROT. a Oa TH: CO~IMISSION Alaska Oil & Gas Conservation Commission Enclosure cc~ Department of Fish & Game, Habitat Section w/o encl. Department of Rnvironmental Conservation w/o/encl. Department of Labor~ Supervisor, Labor Law Compliance Division w/o encl. SOHIO ALASKA PETROLEUM COMPANY July 23, 1980 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL. POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attention: Mr. H. H. Hamilton Gentlemen: Well J-13 (22-03-11-13) Enclosed are the following documents, in triplicate, along with our check for $100.00 to cover the permit filing fee. 1. Application for Permit to Drill; 2. Proposed Drilling Program Outline; 3. Surveyor's Plat shc~ing well location; 4. Blowout Prevention Equipment Diagram; 5. Pad Map showing well course. Very truly yours, SOHIO ALASKA PETRO~ CC~4PANY District Drilling Engineer Enclosures cc: Well File #17 (' PROPOSED DRILLING AND CCMPLETION PROGRAM Wm--.T. J-13 (22-3-11-13) Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 12 cu.yds, concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Arcticset II cement. Blc~out Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer frcm 13 3/8" casing point to T.D. Maximum possible bottc~ hole pressure is 4390 psi at 8800' TVDss (based on original reservoir pressure). Maximum possible surface pressure is 3330 psi based on a gas column to surface frcm 8600' TVDss and an oil column to 8800' TVD. Directionally drill 12 1/4" hole to 8585' TVD. Run 9 5/8" 47# L-80 Buttress casing to 8585' TVD and cement first stage with 1540 cu. ft. cement. Cement second stage through D.V. packer collar at 2600'+ with 130 cu. ft. Arcticset I cement. 9 5/8" casing will be hung at surfa, ce~ the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9385' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 310 cu. ft. Class G ~t with 18% salt. Run 7" tubing with a production packer assembly at 7980'+ TVD. A subsurface safety valve with dual control lines will be placed at 2100'+. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follc~. Form 10-401 REV. 1-1-71 la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN T~ (Oth~ msUuct]ono ,,n reverse s, de) PERMIT TO DRILL OR DEEPEN DRILL ~] DEEPEN l--'] b. TYPE OF WELL WELL WELL OTHER Z NAME OF OPERATOR Sohio Alaska Petroleum Company SINGLE MULTIPLE 3 ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4 LOCATION OF WELL Atsurface 650' SNL, 804' WEL, Sec. 9, TllN, R13E, UPM At proposed ~od zone 1710' SNL, 2280' EWL, Sec. 3, TllN, R13E, UPM 13 DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* ] 0 m~ ] P_.~ NW of Deadhorse 14. BOND INFORMATION TYPE Blanket Surety and/or No. American Insurance Co. 3348616 API #50-029-20497 6 LEASE DESIGNAI~ON AND SERIAL NO ADL 28281 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 uNrr FARM OR LEASE NAME Prudhoe Bay Unit 9 WELL NO J-13 (22-03-11-13) 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11 SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 3, TllN, R13E, UPM 12. Amount $500,000.00 15. DISTANCE FROM PROPOSED * LOCAIION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest dng, umt, ff any) 1710' south of ADL 28278 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT 2175' north of Well J-5 16 No OF ACRES IN LEASE 2560 19 PROPOSED DErrtt l1707'MD 9385'TVD 1 ? NO.ACRES ASSIGNED TO THIS WELL 160 20 ROTARY OR CABLE TOOLS :icsetI 21. ELEVATIONS (Show whether DF, RT, CR, etc ) 22 APPROX, DATE WORK WILL START ~-- ~ = 65' AMSL August 20, 1980 23 PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE MDSE~ING DE~V~ Quantity of cement 36" 20"x30" [nsulated Cor~uctor 110' 110' 12 cu.yds. Arcticsetconcrete 17%" 13 3/8" 72~ L-80 2670' 2670' 3720 cu. ft. Arcticset II 12~" 9 5/8" 47# L-80 10562' 8585' 1540 cu. ft. ClassG;130cu.ft. Arcti R~" 7" 29# L-80 11707' 9385' 310 cu. ft. Class G w/18% salt See attached proposed drilling program outline. RECEIVED JUL B $1,9 0 Alaska 0il & Gas Co,~. Anchorage IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal Is to deepen g~ve data on present producUve zone and proposed _. new productive zone. If proposal Is to drill or deepen dtrect~onally, g~ve pertment data on subsurface locations and measured and true EFt: ver~cal depths. G~ve blowout preventer program. 'd~ 24. I hereby c~ean District SIGNED.~ DATE 7 '- ~ ~ ~'-~ ~ TrrLE Drilling Engineer Ri H- ~-~- ~- -~'I ' - - ~DITIONS OF APPROVAL, IF ANY ~P.I. NUMERICAL CODE (This space for State office use)  SAMPLES AND CORE CHIPS REQUIRED MUD LOG OTHER REQUIREMENTS [ D ES DIRECTIONAL SURVEY REQUIRED  [] NO PERMrr N O ~ O. ~ ~ APPROVAL DATE C§,V, SSiON*s.. o. R...,,. S d. DATE 07/31/80 02 20 30 d-8 -- (Actual) (Pro~oted) J-9 Actual 20 :50 40 o____~ J-? -~t (Actual ~ 3005' v d - 6 (Actual) d -12 .~_~. ( Propoled ) (~ _ , -- - ' , ,, 104' d-6 Lat = 70°19'$7 82" Long. = 148050'08 96" 9 X= 64:5,547 _ Y: 5,970,605 16 t I0 20 2280' -- i j_ I$ ( PrOpOlad ) ~ (Propo.ad) PAD DETAIL SCALE I"= 300' PORTION T. II N., R.13 E. 15 i SCALE I"= I/2 MILE CERTIFICATE OF SURVEYOR ! hereby certify that lam properly registered to practice land surveymg in the State of Alaska and that this plot represents o location survey of the wellpad shown and the wel~ thereon. This survey was made by me or under my supervisJor~.L and all dimensions and other details are correct. Bottom hole locations are furnished by others. JUL Date NOTE All bottom holes are 8800' sub sea PAD "J" EXTENSION Located ~n NE I/4 PROTRACTED SEC 9 UMIAT MERIDIAN Surveyed for SOHIO PETROLEUM COMPANY Surveyed by F.M. LINDSEY 6 ASSOC. ADDED PROPOSED BOTTOM HOLE J-l:5 CJR 6/iB/BO LAND 6 HYDROGRAPHIC SURVEYORS REVISED PROPOSED BOTTOM HOLE J-Il FROM 680' TO650'SNL, FROMSO' TO75'WEL PJR 1/51 2502 West Northern L~ght$ Boulevard Box 4~081 REVISED PROPOSED BOTTOM HOLE J-IA FROM 780' TO 800' WEL PJR 1/21/80 Anchoroge Aloska B.O. F,'-"~S TA C K CONFIGUF~TION 13 5/8" TRIPLE RAM STACK 5000 PS1 WP DRILLING ANNULAR PREVENTER Z" KILL LINE CHECK GATE GATE J I I PIPE RAMS I I BLIND RAMS DRILLING SPOOL CHOKE LINE l__ . GATE HYDR. ASST. GATE .1 PIPE RAMS 1 TVD 4756 4684 TVD 4615 TVD4545 TVD44?q ,4285 4:~15 / TVD 4054 ~ TVD 4608 TVD 474i ~ T VD 4676 )TVD4610 i ~TVD 4545 I )TVD 428~ TVD 4191 I ~TVD 42151 I TVD 411 TVD 414~ I I TV05987 J TV0394~ + + 58:'5 TVD $858 TVD 377~. :5738 TVD T¥D 3781] 1 ~1~05660 TVD ~VD 3"4~T~ 329, TVD 3~6~T~ 3200+ ~d-7 TVD 4084 ~~TVD4004 TVO 3959~ '~..D ~9Z2 TVD ~871 ~V~ 56~8 + TVD 3780'~ TVO 3687~T~D$66~ TVD 3592 TVO$592~b.~Z~,572 450' lO0' $50' · CHECK LIST FOR NBW WELL PERMITS Item Approve Date (1) Fee ~/~J~- ?-~L~-f0 1. 2. 3. (2) Loc. ~/~ Q-%~0 4. /~ ~ 5. (3) kgmin ~~ Lease &Well No. Remarks O~mpany Yes No Is the permit fee attached ......................................... ~- Is well to be located in a defined pool ............................ .~/~ __ Is a registered survey plat attached .............................. -/~-~ well located proper distance frcm property line ................. :~ Is Is well located proper distance frcm other wells .................... /~. undedicated acreage available in this pool ............ 6. Is sufficient 7. Is well to be deviated .............................................. 8. Is operator the only affected party ................................. 9. Can permit be approved before ten-day wait .......................... ~ __ 10. Does operator have a bond ~ force .................................. 11. Is a conservation order needed ...................................... 12. Is administrative approval needed ................................... 13. Is conductor string provided ........................................ 14. Is enough cement used to circulate on conductor and surface ........ 15. Will cement tie in surface and intermediate or production strings ..~ 16. Will cement cover all known productive horizons .................... 17. Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst.~ 18. have sufficient pressure rating - Test to _~2~2o psig 19. Does BOPE J -13 Approval Reccmmended: Additional Requirements: ~~ ~/d~/~g///~//, .~ ~-~f-/~ / J~3 ~ Co'Is,,,-/ Geology: Enginee.rin9: HWK LCSd~ BEW <~ JAL rev: 03/05/80 Well Histo~ File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Company SOHIO LIBRARY TAPE CURVE SPECIFICATIONS PETROLEUM COMPANY Well J-13 Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 12-21-81 Curve Name (Abbrev.) Standard Curve Name Logs Used GR1 CCL1 LSN1 SSN1 Gamma Ray Casi~.g Collar.Locator Long ppaced Short Spaced Compensated Neutron CN1 GR2 t' Gamma Ray CCL2 I Qasing Collar Locator LSN2 . Long Spaced SSN2 Short Spaced Compensated Neutron CN-Mult ispaced GR3 Gamma Ray CCL3 Casing Collar Locator LSN3 Long Spaced SSN3 Short Spaced CN3 Compensated Neutron Scale 0-100, 100-200 0-10 0-1250 0-I000 60-0 0-100, 100-200 0-10 0-1250 0-1000 60-0 0-100, 100-200 0-!0 0-1250 0-1000 6O-O S__/3HTO AL~,.c:;_K.&. PETRfll F_II~ 3-1_3 1-5 £~RVER ~ ............... DR[ CN! CCL~_ ~ St,Il ~_ fit~p CN2 £C~ 2 LSN~ S.C;l~!:p r.F~X £N3 CE! 3 L.RN3 R.e-,N3 ~OP1 108flO.Q~.J--3-O-11715:O0 ~-~AF!PLES pFR RECORD PAGE OH-!O-A~A~ETROLE!!~ ~!~ --~EPTH _GR! CC~.! CN! ~Sr,!! ~T ....... API · AP! ~.___73 ~. 5 0,80 5!=0 96!:~ ~07 ~- 5 78 = ~-~.0 :-~ .... ~: 0 ~,~+9~=9 !87=! 10R22 0 90 q 10~2~ 0 88 2 0 i~ ~!9 8 Pll ? ..,o 87~s 0.80 56~! ~-gq.n ~x~j ~~o.R n.o ~.~ LO~28~Q ~9,0 0.80 5~,0 18q~ ~~ ~7 ~R d~O 97,0 ~,0 8~ O~8n ~4 P02.~ ~09.7 87.~ O~R O.O 105.5 PAGE 2 DH_IXI~.6LA~KA PETROLFII'~ ~[]F_P__I_H_ GR! CCL! CN~ m .SN1 RP-,N1 GR..'?_ CCL~ CN:~ LSN:) .~N2 _~ FT .... AP_T ~ ~P_I .~ PAGE ~.Q ~AL~S K A -!3 __~_._T._~__._. OR1 ££L1 CN1 I SN!. S~N1 GR2 _CCL.2.. CN2 LSN2 ~SN2 FT' ..... /~J~_I ~. A P ]' ~ 10922 0 PAGE DEPTH GR! Cci ! CN1 IS_N1 SSN1 GR2 CCL2 CN2 LSN~ SSN2 _ _IrT a,P! ~ AP_T ~ PAGE QH.[O'ALASKA P~TNOLFIJM __ DEPTH GR1 C£L! CN! I SN! ggN~ GR2 ~£L2_ CN2 LSN2 ~SN~ __ FT____APT ~ ........ AP~_ ~ 110.O_Q..,_Q_ ...... D1._.q n_.sn g_-7 I n_l.p=P _ c~1.9_.5 76-_7 ~. NIJ!V~RE.R ___ I 18'7._ on PAGE O-H!O ALASKA PFTROLFUM ~T _ ~PT ~ APT 0 85 7 PAGE OHIO 'ALAgK4 PETROLE~ PAGE .5. __D_EP_T H GR3 C C L.'5 CN3 I SN~ PAGE q, OI=LID-~_~4J_A~ A __ DEPTH GR3 Cci ___F_T _._APT_ ~ APl'_ PAGE ~__E.T_ ....... ~ P T ~ A P 1' CONHBDffiAL LVP 010,H02 VERZFICATXON bISTZNG P'AGB I ** RBg~ HBADER DATE Ig4/09/ ORIGIN ; REEL NAME { CONTINUATION PREVIOUS REEL COMMENTS : ~* TAPE HEADER *e SERVICE NAME IED~T DATE 84/09/ 2 ORIGI~ 10000 TAPE NAME 19410 CONTINUATION # $01 PREVIOUS TAPE ~ COMMENTS I EOF ** FTbE HEADER FILE NAME IED~T ,001 SERVICE NAME VERSION # DATE ~ ~AXIMUM I,ENGT~ [ 1024 FILE TYPE PR~V)OUS riLE ** INFORMATION RECORDS ** MNEM CONTENTS CN { SOHXO A6A~A PETROLEUM COMPANY FN { PRUDHOE BAY RANG{ TOWN{ I~N SECT! 9 COLIN{ N.SbOPE STAT{ ALASKA CTR¥! USA ~m ~ ~m~ m~ ~m~ 000 000 030 O65 ooo O0 000 0 065 000 000 004 065 000 000 004 065 000 000 00:~2 065 000 000 008 065 ~00 0~0 0:06 065 O0 0 0 003 065 V bVP OI0,H02 VERIFICATION LISTING PAGE 2 SCHLUMBERGER ~ ALASKA COMPUTING CENTER COMPANY ~ &OHIO ALASKA PE?RObEU~ COMPANY rI£bO = PRUDHOE BAY COUNTY = NORTH SLOPE BOROUGH STATE = ALASKA dOB ~UMBER AT ACCI 6941,0 RUN #2'HDATEH~ hOG,EOf 13..JUL-1~4 LDP ~ CAS/NG ~ 13.375" SURFACE TO ~6 0[ CASING 9.625" SURFACB ?0 ! ?_:0 CASING - 7.000" SURFACE TO 10269 TYPE FLUID · CRUDE OZb FLUID bEVEl, = FLOWING ********************************************************************************* · L~ I'I[, I l -I1 e I;.] iii_: [;.] i~ V bVP 0t0,H02 VERIFZCA?~ON bZS?ZNG PAGE 3 ~NTRY BbOCK$ TYPE SIZE 2 4 8 4 9 4 0 REPR CODE £NTR¥ 66 1 73 60 65 o~,, ~. ooooo oo o o , ,'6, ooo.oooo.ooo ZER GAPI O0 310 O1 0 0 4 1 68 00000000000000 oooooooooooooo F,SIG PS! CU O0 400 ?RAT PSi O0 420 GR PSI GAP1 O0 310 BACK PS! CPS 00 390 FBAC PSi CPS O0 39~ NTD~ PS 1 CPS O0 390 ~TDT PSi CPS O0 391 SIGH P32 CU O0 400 FSZG PS2 ~U O0 400 TRAT P&2 00 420 ~R PS2 GAP1 O0 310 BACK P&2 ePS O0 390 FBAC P&2 CPS O0 391 "TOT PS2 CPS 00 390 30 P&5 cPGAPI O0 3109 BACK P~5 CP&S O0 00 oi o 0 o°I o t? 0 o0 0 O0 0 o o ol o 0 oOO o 0 o~ °o O1 Ol Ol 0 O0 O! ol Ol 0 Oi 0 0 0 o 0 0 0 0 oo :. 0 0 O0 ? 0 0 0 0 0 4 4 4 4 4 4 i 68 00000000000000 68 00000000000000 68 00000000000000 ~ 6800000000000'000 I 68 00000000000000 I 68 00000000000000 68 00000:000000000 i 68 00000000000000 68 0000000000000'0 i 68 00000000000000 ,t, 68 0000000:OOOOO0:~ 1 68 00000000000000 i6,8 O0000:O0000000'.O ~oooooooooooooo i~:=~ oooooo.oooooo oooooooooooooo ~ oooooooooooooo ! 68 00000000000000 i~ 68 0:0000'000000000 68 00000000000000 O'OOO00000OO000 i~ 00000000000000 I68 00000000000000 ,~, oooooooooooooo t~'~ °°oooooooooooooo° o. oo o oooo~oo i~ oooooooooooooo oooooooooooooo 1~ OOooooooooooooooO ooo,:oo.ooo I~:~ oooooooooooOOOoooooooooooooo 68 00000000000000 ~ 68 00000000000000 I ~ ooooooooooo=ooo bVP 010.H02 VER[F[CA?[ON b~STING PAGE NTDT P$5 CPS O0 390 FTDT PS5 CPS O0 39! O0 0 0 4 O0 0 0 4 DEPT NTDT TEAT ~TDT ?RAT NTDT TROT ~T~T 109~ 4 159~ 120~ 1387 0000 ~R 3906 GR 0000 FTDT 322 3555 GR 43 0000 FTOT 285 4766 GR 50 0000 FTDT 452 5313 GE 59 0000 FTDT 77 0 2500 SXGM 41 9375 BACK 0000 SXG~ 3750 BACK 7 $IGM ,~000 SXGM 938 BACK O0 SIO~ 5000 DEPT TRAT NTDT TRAT NTDT TRAT ?RAT NTDT TRAT ~TDT 1170~.0000 G~ ,3242 OR 167~ 0000 .4219 1635 0000 FTDT 4 2930 OR 1540 0000 FTDT 4 5273 QR 1673 0000 FTDT 9 2 49! 52 464 56 455 0938 5ZGM .9687 BACK 7500 SXGM 0000 BACK 7500 SXGM ,5938 BACK 0000 SIGM .4063 BACK ~00 SIC~ 50 BACK 2500 DEPT TRAT NTDT TRAT NTDT TRAT NTDT TRAT NTDT TRAT NTDT 1160~00 GR 39~ GR 996,5000 FTDT 926 0 FTDT 2'8359 OR '0000 FTDT 1010~5000 FTDT os:] sza. BACK 25 BACK 434,?~00 TRAT NTDT ?RAT NTDT TRAT NTDT TRAT TRAT NTDT · OR 78~.~00 FTDT 45 OR '0000 FTDT 58~'5723 OR 5:0000 FTDT 892.5957 QR 85~.~000 FTDT · 246 GR R09,5000 FTDT i 9,4688 SXGM 2,453i BACK 393,7500 SXGM _32,~062 BACK 311,2500 $IGM 33,~938 BACK 424,2500 SZGM 37,8125 BACK 410,2500 SZGM _{?.7813 BACK 377.7500 68 00000000000000 68 000000.00000000 48,5625 FSIG 392,00100 FBAC 50,5938 FSIG 1478;0000 FBAC 52.1875 FSlG 2{%6;0000 rBAC 49,2500 FS~ 54,0000 FS~G 2~40e0000 FBAC 56,5313 FSlG 447,2500 rs~c 54.9687 53.5938 1993'0000 FBAC 55'4063 PSIG X~53'0000 FBAC 55,9375 2~90;0000 rBAC 24,57~[ FSZG 23,9375 FSZG i~3~O00O FBAC '27.9906 rSZG 1916;~.0:000 FBAC 25,t250 r$~G 2'Ot?iOOO0 FBAC 24,9687 FS~G 2{66,0000 FBAC 46 8750 %25 62;$0 42 6250 349 2500 49 0938 5625 395 7500 47 3438 .5 $4 0 O00 52 6875 * 50 328; ~5:90 50,9062 41.4' 0'000 51,5938 420'0000 52,6250 5 % 3. S000 93?5 7500 6125 347 250.0 20 953i 360 2500 19 62S0 384 OO0O 20 0156 436 7500 $OOG 21,1719 3~ :S:O004063 22,2187 3~7' ~500 22,4531 bVP 010,H02 VERIFICATION blS?ING PAGE DEPT ?RRT ~? 108{ ?RAT N?~T 107~ NTDT 991 ~TDT ~052 ~TDT 1097 11400 0000 GR 2 5410 gR 13 0000 F?DT ~430 GR 15 oooo rTOT 521 O0 rTDT 5352 ~R 22 0000 rTDT 513 5879 GR 24 0000 rTDT 510 2344 SIG~ 3906 BACK 0000 5iG~ 2891 BACK 5000 SlG~ q813 BACK 2500 SIGM 3125 BACK 0000 SIGM 9062 BACK 0000 OEPT 1130~ TRRT NTDT 949 TRAT 2 NTDT 970 TART 2 NTDT TRAT NTDT 965 TART 2 NTDT 820 0000 GR 8 1582 GR 11 0000 FTDT 544 2012 GR 15 5000 rTDT 540 2168 GR 2~ 5000 FTDT 55~ 1816 GR 22, 0000 PTDT 54~, 0781 GR 0000 FTDT 499 75 BACK 50OO SIGN 2578 BACK o000 8281 BACK ,0000 STGM 250 BACK 000 7500 DEPT 1120~ TRAT NTnT 1414 TRAT 2 ~TDT 138~ TRAT NTDT 127; TRAT NTDT 1477 TRAT 2 NTDT 1465 0000 OR 4570 OR 0000 FTDT 4902 OR 0000 FTDT rTDT 5254 GR 0000 PTDT 2324 GR 0000 rTDT 3,781 SIGN 5,531~ BA:C~ 704,000 SXGM 675.0000 SZGM 27 ~939 BACK oooo 1 5000 SIGN 7~5 7500 BACK 784 0000 DEPT 1110~ TRAT ~TDT 156; TRAT MTDT 1568 TRAT 2 NTDT 144~ TRAT NTDT 150~ TRAT NTDT 166~ O0 Gfl 0000 G~PI 6035 0000 PTDT 5098 GR 0000 rTDT 6094 OR 0000 rTDT 0000 t l,6016 SiGN ?,0781 BACK 717,0000 24,5156 BACK 737,0000 SIGN 29.4844 BACK 703,50 SIGM ,6563 BACK 76~,~000 OEPT TRAT NTDT TRAT NTDT ?RAT 7266 GR 77,6875 SiGN 93,~X25 BACK 753,5000 SIG~ 97,~7S0 BACK 793,5000 SIGN ~0~250 BACK !7 t~76 16 1949 17 2:056 16 2242 8125 FSIG 0000 6563 0000 r8AC 62~0 FSZG 0000 FBAC 7500 FS~G FBAC 14 1359 ! 2362~ 6641 000o 7734 r$IG OOOO 8047 oo00 1562 rSZG 000FBAC 734 FSIG 0000 19,2656 18,9844 r$IG 197t~00~0 FBAC 18.5469 FSIG 21%0,;00~0 FBAC 20,25'00 20,2187 r~iG 234~*0000 rBAC OOPO FSAC 17.4531 1925;0:000 FSAC 17,7813 -2~76.0000 rBAC 16.9531 PSZG 2Ii4,0000 FBAC 17,5156 PS~G 2326*0000 '17,2500 FSIG 1909~0000 FBA:C 1'7.4688 2S26~0000 FBAC 17;7i88 2~92,0000 200,0000 15,6875 3t4;5'000 14,3750 324'7500 15,5938 401,5.000 14,92!9 420,2500 12 0078 210 6250 Il 6172 274 75100 12 1172 335 2500 !2 140b 351S~O0 11 7734 405:,25,00 !6,3750 441,250' 32,?5:00 14,0703 !4,2i09 396~-25'0i0 i3.9453 482~5:000 5i4,60i6 83,0000 i4,2i09 32,0000 LVP 010.H02 V£RIFICATION LISTING PAGE 6 NTDT TRAT NTDT TRAT NTDT 059 0000 FTDT ! 8027 GR ~7 0000 FTDT I]2 7~93 ~R 734 0000 FTDT 74~,0000 SIGN 10,$125 BACK 7 ,: ooo 5~.0000 DEPT 10900 TRAT 3 NTDT 1788 TRAT 3 ~TDT 180~ TRAT NTDT 180~ TRAT NTDT 1o4; TRAT NTDT 1721 0000 FTDT 2676 OR 0000 FTDT 2656 GR 000 FTDT 207 GR  000 rT~T 266 GR 0000 FTDT 28 4531 SZGH 36 103750 BACK 000 715 43 694 53 692 56 687 SIGM BACK 0000 SIGN ,6875 BACK, 25 BACK 5000 DEPT 10860 TRAT 4 NTDT 182~ TRAT NTDT 1969 TRAT 4 NTDT 2031 TRAT 4 NTDT 1975 TRAT 4 NTDT 1869 0000 GR 4805 GR 0000 ~IDT 5078 0000 FTDT 3516 GR 0000 FTDT 6328 GR o000 FTDT 4688 GR 0000 rTDT 3 531 568 60 ¢0 ? SIGR 50 BACK 5000 SIGM 0000 BACK 0000 SIGM 6875 ~ACK 5000 5000 ~ACK 0000 SIGA ~750 BACK 0000 *$ FILE TRAILER rILE NAME {EDTT ,001 SERVICE NAME VERSION # DATE MAXIMU~ LENGTH I 1024 rILE TYPE NEXT rILE NAME EOF ********** ** TAPE TRAILER SERVICE NAME IEDIT DATE 184/09/ 2 ORIGIN 30000 TAPE NAME 19410 CONTINUATION # 101 NEXT TAPE NAME { COMMENTS { REEL TRAILER 18.7188 F$IG 2a 14' 0000 teAC 16,3906 FSIG 2 $ 3~ 8., 0 O00r B AC 24,6094 F$IG 1879.0000 teac 24,i562 FSiG 2~40,0000 24.3750 F$iG 2250:';0~00 25,5156 F$iG 2418.'00~0 FBAC 25,3906 · 24t4'0000 FBAC 37.1562 1907'0000 36,5313 2190~00~0 35,8437 F$IG 2394,0000 FaAC 37,5313 rSIG ,,oooo ,7188 FSiG 2S~2;0000 FBAC 14,1641 63~,5000 14,1094 689,0000 21 3906 435 21 3438 4970000 4844 2~ '52550.00 2! 5'9:0000 586 0000 36 ~0313 568 ,SO00 37,0313 60~i:0~00 37 4698 'II o,o.:o 659-~000 LVP 010,H02 VERIFICATION LISTING PA.G~ SERVICE NAME {EDIT DATE IR4t091 2 ORIGIN { REEb NAMF S CONTINUATION # :01 NgXT REEL NAMg : COMMENTS : v ~mmmmmmmmmmmmmmmmmmmm~ bls TAPE VERIFICATION LISTING bVP 009.H03 VERIFICATION LISTING PA~E ** REEL HEADER SERVICE NAME :$ERVIC DATE :81/08/ 8 ORIGIN : REEL NAM~ IREEL ID CONTINOATION # :01 PREVIOUS REEL COMMENTS :~EEL COMMENTS ** TAPE PEADER ** SERVICE ~AME :SERVIC DATE :81/08/ 8 ORIGIN :F$1A TAPE NAME : CONTINUATION # :0~ PREVIOUS TAPE : COMMENTS :TAPE COMMENTS EOF ** FILE HEADER FILL NA~R :SERVIC.O01 SERVICE NAME : VERSION # DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE : ** INFORMATION RECORDS MNEM CONTENTS CN : SOHIO ALASKA PETROLEUM COMPANY WN : J-~3. 9'~ N-13E FN : PRUDHO[ BA~ RANG: ~ANGE TOWN: TOWNSHIP SECT: SECTION COUN: ~ORTH SLOPE STAT: ALASKA CTRY: USA MNEM CONTENTS PRES: NEDIT4F ** RECORD TYPE 047 ** RECORD TYPE 047 UNIT TYPE CATE SIZE CODE 000 000 030 065 000 000 018 065 000 000 012 065 000 000 005 065 000 000 008 065 000 000 007 065 000 000 012 065 000 000 006 065 000 000 004 065 UNIT TYPE CATE SIZE CODE 000 000 007 065 LVP 009.b03 VERIFICATION LISTING PAGE RECORD TYPE 047 JOB 10707,62056 TDT RUN #1, 30'jUL'8! BTM. LOG INTERVAL TOP LOG INTERVAL TYPE FLUID IN HOLE CASING SIZE CASING SIZE 11732 10750 OIL 7 IN. 9.625 IN. SURF. TO 10264 SURF. TO 10780 ** DATA FORMAT RECORD ENTRY BLf]CKS TYPE SIZE REPR CODE ENTRY 4 8 4 73 6O 9 4 65 .lIN 0 1 66 0 DATUM SPECIFICATION BLOCKS MNE~ SERVICB SERVICE UNIT API APl AP1 APl FILE SIZE PROCESS SAMPLE REPR ID ORDER # LOG TYPE CLASS ~OD NO. LEVEL CODE DEPT FT 0 0 0 0 0 4 0 1 68 SIGM TDT CO 0 40 1 0 0 4 0 i 68 FSIG TDT 0 0 0 0 0 4 0 ! 68 TRAT TDT 0 42 1 0 0 4 0 ! 68 NTDI TDT CPS 0 0 0 0 0 4 0 1 68 bVP 009.H03 VERIFICATION 6ISTING PAGE 3 FTDT ?D? CPS 0 0 0 0 0 GR TDT GAPI 0 31 32 0 0 BACF TD? CPS 0 0 0 0 0 FBAC TDT CPS 0 0 0 0 0 GSF T~ 0 0 0 0 0 ** D DEPT NTDI FBAC DEPT NTD'I FBAC DEP~ NTD~ FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTD~ ATA *~ 11750. -999, -999. 11700. 512. 60, 11600. 378, 39. 11500. 336. 44. 11400, 371, 46. 11300, 346, 63, 11200, 405. 74. 11100. 562. 80, 11000, 7 10900. 584. 121. 10800, 734. 113, ~0743. 686. 50 25 25 O0 5O 56 O0 75 40 00 00 34 00 75 25 O0 25 03 O0 25 62 O0 50 31 00 00 O0 37 00 50 18 5o SIGM FTDT FTDT SIGM FTDT GSF S1GM FTDT 8IGM FTDT GSF FTDT GSF SIGM FTDf GSF FTDT GSF SIG~ FTDT GSF SIGM FTDT GSF 8IGB FTDT GSF SIGM FTDT -999,250 -999.250 '999,250 47,188 145.750 1.000 21,219 181,125 1.731 21.688 130,000 1.731 17.328 188.625 1.731 13.719 176.875 1.731 17.922 217,625 1.731 1b.531 257.~50 1. 31 15.484 220.250 1,731 23.578 229.750 1,000 35.781 226.250 1,000 35.750 186,875 FSIG GR FSIG GR F$IG F$IG GR F$IG GR FSIG GR FSIG GR FSIG GR F$IG GR FSIG FSIG GR F$IG GR -11,727 -999.250 40.03i 48,156 17.2~0 18.844 18.672 29.109 14.672 11.188 11.898 8,602 14,445 20.891 13.836 20.156 12.820 79.375 21.359 34,344 3t.172 62.375 'ao.828 TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BAC~ TRAT BACK TRAT BACK TRAT BACK I 68 1 68 1 68 -999.250 -999.250 3.254 130.625 2,545 177.750 3 252 2.465 253.000 2.240 298.250 2.359 329.750 2,625 357.750 1,704 379,750 3,240 424,250 4.305 415.250 4,563 410,000 VERIFICATION LISTING FBAC 106.625 GSF 1.000 ** FILE TRAILER FILE NAME :SERVIC.O01 SERVICF NAME : VERSION # DATE : MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILF NAME PAGE ,~ FILE HEADER FILE NAME :SERVIC.O02 SERVICE NA~E : VERSION ~ : DATE : NAXIMUM LENGTH : 1024 FILg TYPE PRE¥IOU& FILE ** INFORMATION RECORDS MNE~ CONTENTS PRES: ~iEDIT4F ** RECORD TYPE 047 ** RECORD TYPE 047 ** ** RECORD TYPE 047 UNIT TYPE CATE SIZE CODE 000 000 007 065 ** DATA FORMAT RECORD ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 4 1 66 ~ 4 73 60 9 4 65 .liN 0 1 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT ~PI API APl APl FILE SIZE PROCESS SAMPDE REPR LOG TYP~ CLASS MOD N~. ~EVEL CO~E ID ORD~R~ F~ 4 0 1 6 CU DEPT 0 0 0 0 SlGM 'rOT 0 40 1 0 0 4 FMIG TD'r 0 0 0 0 0 4 TRAT TOT 0 42 1 0 0 4 NTD~ TDT CPS 0 0 0 0 0 4 FTDT TDT CPS 0 0 ~ 0 0 4 68 68 68 ~8 VERIFICATION BACK TDT CPS FBAC TDT CPS 5ISTING PA~ i 68 I 68 1 68 ** OATA ** DEPT NTDT FBAC 11751 -999 -999 DEPT NTDT FBAC 11700 547 77 DEPT NTDT FBAC 11600 403 117 DEPT NTDT FBAC 11500 305 108 DEPT NTDT FBAC 11400 413 82 DEPT NTDT FBAC 11300 334 80 DEPT NTOT FBAC 11200 401 86 DEPT NTDI FBAC 11100 530 89 DEPT NTDT FBAC 11000 347 107 DEPT NTDT FBAC 10900 590 132 DEPT NTDT FBAC 10800 762 122 DEPT NTDT FBAC 10746 706 166 ,500 ,250 ,250 ,000 ,000 .875 ,000 .250 .000 000 50O 875 000 000 688 000 750 312 000 000 938 000 500 625 000 500 ~25 000 000 875 000 000 875 bO0 500 625 FTD FTO GSF SIG FTD SIG FTO $IGM FTDT $IGM FTOT GSF FTDT FTDT GSF SIGN FTOI GSF SIGN FTDT GSF SIGM FTDT SIG~ FTD~ GSF -999, =999. -999. 50. 141. O. 21. 170, 1. 20, 139. 1, 17. 200. 1. 13, 180. 1. i7. 203. 1. 16. 264. 1. 15, 232. 1. 23. 233. 1. 35. 234. 1. 36. 177. 1. 250 250 250 031 625 577 797 000 73i 484 500 731 578 500 731 281 625 731 813 750 731 328 250 731 695 375 731 031 250 000 625 625 000 125 000 000 FSIG GR F$IG GR FSIG GR FSIG GR F$IG GR F$IG FSlG GR FSIG GR FSlG GR F$IG GR FSlG GR FSIG GR -999,250 56,406 41.625 53.281 18.875 34.312 16.359 38.291 14,461 22.734 11,211 21.672 13.914 33,281 13.641 32.969 12.492 97,750 18,953 51,156 32.531 7b.6~8 37.250 57.791 TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK 214.250 -999.250 3 576 374:750 2,027 412.750 3.207 401.750 2,211 403,250 2.023 416.000 2.113 429,250 2,447 440,750 1.662 458.000 3 053 492:750 4.453 5.375 468,000 LVP 00g. H03 VERIFICATION LISTING PAGE 6 ** FILE TRAILER FILE NAME :SERVIC,O02 SERVICE NAME : VERSION # DATE : MAX1MUM LENGTH : 102~ FILE TYPE NEXT FILE NA~E : EOF ** FILE HEADER FILE 'gAME :SERVIC.O03 SERVICE NAME VERSION # DATE : MAXIMU~ LENGTH : 1024 FILE TYPE PREVIOUS FILE ** INFORMATION RECORDS MNEM CONTENTS PRES: NEDIT4F RECORD TYPE 047 ~ RECORD TYPE 047 *~ RECORD TYP~ 047 ** UNIT TYPE CATE SIZE CODE 000 000 007 065 ~* DATA FORMAT RECORD ENTRY TYPE SIZE REPR CODE E~TRY 4 ~ 4 73 60 9 4 65 .lin 0 ! 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT APl API APl APl FILE SIZE PROCESS SAMPLE REPR ID ORDER # bOG TYPE CLASS MOD NO, LEVEL CODE DEPT SIGH TOT FSlG TDT TRAI TDT NTDT TDT FTDT TOT ~R TUT BACK TOT FT CU CPS CPS GAPI CPS 0 0 0 0 0 4 0 4O 1 0 0 4 0 0 0 0 0 4 0 42 1 0 0 4 0 0 0 0 0 4 0 0 0 0 0 4 0 31 32 0 0 4 .o .o o_ _o 9 4 68 6,8 68 68 68 68 68 LVP 009.H03 GSF TDT VERIFICATION LISTING PA~ 1 68 ** DATA DEPT NTDI FBAC DEPT NTDT FBAC DEPI NTD1 FBAC DEPT NTDI DEPT NTDT FBAC DEP% NTDT FBAC DEPT NTDT FBAC DEPT NTDT FBAC DEPT NTDI FBAC DEPT NTDT FBAC DEPT NTDI FBAC DEPI NTDT FBAC 11751.000 -999.250 -999.250 11700.000 554.000 119,375 11600,000 442.000 111.43~ 11500,000 328,000 82,000 11~00.000 454.250 90.375 11300,000 396.75O 91.938 11200,000 404,750 96.438 11100.000 569,500 179.625 11000.000 38b.000 113,063 10900,000 600.000 138.625 10800.000 735.500 263.000 10745,500 686.500 122,938 SIGN FTDT GSF SIGN GSF SIGN FTDT GSF SIGN FTDT GSF SIGN FTDT GSF SiGN FTDT GSF SIGN SIGN FTDT FTDT GSF SIGN FTDT GSF SIGN FTOT FTDT -999 .-999 999 46 134 1 21 176 1 21 154 1 18 194 I 194 1 18 205 1 16 261 1 15 245 1 22 226 1 37 224 1 35 191 1 .250 25O :250 .500 .500 .000 .516 .000 .731 .016 .125 .731 ,063 .500 .731 .555 .500 .731 .203 .375 ,731 ,609 .750 .731 .445 ,375 .731 .609 .625 ,000 .312 .875 ,000 .969 .000 .000 FSIG GR FSIG GR FSIG GR FSIG GR FSIG FSIG GR F$IG GR FSIG GR FSIG GR FSIG GR FSlG GR F$IG GR -999,250 -999.2~0 40,656 63,438 16.672 43.000 18.813 50.5tl 16.516 32,156 11.234 32,813 13.813 43.688 14.352 46.625 13,094 103.875 18.875 56,750 40.781 85.625 30.156 74.375 TRAT BACK TRAY BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK BACK TRAT BACK -999.250 -999.250 3.053 443.250 2.590 446,250 2.818 436.250 2,465 437.750 2.188 446.250 2 088 450:750 2.686 487.750 1.728 474.500 3.104 510.250 4,477 527,500 4.488 483,000 LVP 009.H03 VERIFICATION LISTING FILE NAME :SEBVIC.O03 SERVICE NAME : VERSION # : DAT~ : ~AXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME : ** FILE H~ADER FILE NAME :SERVIC,O04 SERVICE NAME VERSIO'~ # DATE : MAXIMUM LENGTH : 1024 FILE TYPE PREVIOUS FILE ** INFORMATION RECORD& MN~M CONTFNTS PRES: NEDIT4F RECORD TYPE 047 ** RECORD TYPE 047 ** RECORD TYPE 047 ** UNIT TYPE CATE SIZE CODE 000 000 007 065 ** DATA FORMAT RECORD ENTRY ~50CKS TYPE SIZ~ REPR CODE ENTRY 8 4 73 60 9 4 S5 .lin 0 1 66 0 DATUM SPECIFICATION BLOCKS MNE~ SERVICE SERVIC~ UNI1 API APl AP1 API FILE SIZE PROCESS SAMPLE REPR ID ORDER # LOG TYPE CLASS MOD NO. LEVEL CODE DEPT FT O 0 0 0 O 4 SIGM TUT CU 0 40 I 0 0 4 FSIG TOT 0 0 0 0 0 4 TRAT TDT 0 42 ! 0 0 4 NTDT TOT CPS 0 0 0 0 0 4 FTDT TDT CPS 0 0 0 0 0 4 GR TOT GAPI 0 31 32 0 0 4 BACK YDT CPS 0 0 0 0 0 4 FBAC TDT CPS 0 0 0 0 0 4 68 68 68 68 68 68 68 68 8_ LVP 009.H03 VERIFICATION LISTING p~ 9 DATA DEPT 11751.000 $IGM -999 NTDI' -999.250 FTDT -999 FBAC -999.250 GMF -999 DEPT 11700.000 SIGH 45 NTDT 491.750 FTDT 115 FBAC 133,500 ~$F 1 DEPT 11600.000 SlGM 21 NTDT 406,750 FTD~ 166 FBAC 97,250 GSF DEPT 11500.000 ~IGM 20 NTDT 313,250 FTDT 146 FBAC 81,750 GSF DEPT 11400.000 SIGM 17 NTDT 401,500 FTDT 175 FBAC 67.625 GSF DEPT 11300,000 SIGM 13 NTDI 328 250 FTDI 175 FBAC. 82:250 GSF 1 DEPT 11200,000 SIGH 17 NTDT 407,750 FTDT 220 FBAC 97,000 GSF 1 DEPI 11100,000 SIGH 16 NTDI 576,000 FTDT 250 FBAC 94,063 GSF DEPI 11000.000 SIGH 15 NTDT 377,250 FTDT 252 FBAC 112,063 GSF DEPT 10900,000 SlGM 23 NTDT 554.500 FTDT 227 FBAC 134,750 GSF 1 DEPI 10800,000 SIGH 35 NTDI 765,500 FTDT 214 FBAC 119,875 GSF DEPT 10746,000 SIGH 35 NTDT 665.500 FTDI 190 FBAC 116.000 GSF ** FIbE TRAIbER FILE N~ME :SERVIC,O04 SERVlCF ~.,'E .250 .250 .250 .219 .000 .000 .813 .250 .731 .547 .625 .731 .219 .375 .731 .523 .875 .731 .688 ,875 .731 ,406 .875 .731 .180 .125 .73I .047 ,750 ,000 ,875 ,750 .000 .500 ,500 .000 FSIG FSIG GR FSIG GR FSIG GR F$IG GR FSIG GR FSIG GR FSIG GR FSlG GR FSlG GR FSlG GR FSlG GR 4.039 -999,250 32.250 67,500 19.156 46.125 15.914 51.219 14.422 35.5~I 11.180 32,469 13.578 47,375 13,758 48,375 13.102 116.375 20,141 65,688 31.297 86,063 .31.828 72,50O TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK -999.250 -999,250 2.867 338,500 1.905 356.500 2,908 348,000 2 244 7 :5oo 2.139 396,750 2.387 412.500 2.551 428,000 1,650 449,250 3.150 483.750 4,359 471.750 4,652 460,500 1 LVP 009.~03 VERIFICAIiON L~STING PAGE VERSION $ : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME : ** fILE HEADER ** FILE NA~E :SERVIC,O05 SERVICE NAME : VERSION ~ : DATE : MAXIMU~ £ENGTH ~ 1024 FILE TYPf : PREVIOUS FILE : ** INFORMATION RECORDS ** MNEM CONTFNT~ mmmm mmmmmmmm PRES: NEDIT4F ** RECORD TYPE 047 ** RECORD TYPE 047 ** RECORD TYPE 047 ** UNIT TYPE CATE SIZE CODE 000 000 O07 065 DATA f'ORMAT RECORD ** ENTRY 5LOCKS TYPE SIZE REPR CODE ENTRY 4 ~ 66 1 ~ 4 73 60 9 4 65 ,lin 0 ~ 66 0 DATUM SPECIFICATION BLOCKS MNE~ SFRVICE SERVICE UNIT API API APl AP~ FILE SIZE PROCESS SAMPLE R~PR ID ORDER # LOG TYPE CLASS MOD NO. bEVEL CODE DEPT FT 0 0 0 0 0 4 SIG~ TOT CU 0 40 1 0 0 4 FSIG TOT 0 0 0 0 0 4 TRAT TOT 0 42 1 0 0 4 NTDT ~DT CPS 0 0 0 0 0 4 FTD2 TDT CPS 0 0 0 0 0 4 GR TDT GAPI 0 ~1 ~2 0 0 4 BAC~ TOT CPS 0 0 0 0 0 4 FBAC ~DT CPS 0 0 0 0 0 4 ~SF TOT 0 0 0 0 0 4 68 68 68 68 68 68 68 68 LVP 009.H03 VEPIFICATION LISTING DEPT 11755,000 SIGH NTD~ -999.250 FTDT FBAC -999,250 GSF DEPI 11700,000 NTDT 492.250 FTDT FBAC 148.125 DEPT 11bO0,OOO S1GM NTDT 400,000 FTDT FBAC 106.188 GSF DEPT 11500.000 SIGM NTDI 365.500 FTDT FBAC 134.500 DEPT 11400.000 NTDT 416.750 FTOT FBAC 100.312 DEPT 11300.000 SIGH NTB? 342,000 FTDT FBAC 90.063 GSF DEPT li200.000 SIGH NTDt 423 500 FTDT FBAC 103:375 GSF DEPT 11100.000 SIGH NTDT 577.000 FTOT FBAC 134.000 DEPT 11000.000 SIGh NTDT 420.500 FTDT FBAC 114.250 GSF DEPT 10900.000 SIGH NTDT 595,500 FIDT FBAC 136.750 GSF DEPT 10800,000 SIGH NTDT 728.000 FTDT FBAC 124.813 GSF DEPT 10746.500 SIGH NTDI 699.000 FTDT FBAC 1i6.188 GSF ** FILE TRAILER FILE NA~E ~SERVIC.O05 SERVICF ~AME VERSION ~ : DATE : -999.250 -999.250 '999.250 45.219 126.375 1.000 21.750 168.250 1.73! 22.469 152.250 1.73! 17.641 205 13.742 167.125 1.73~ 17.734 201.250 1.731 16.438 259.250 1.731 15.656 2~6.500 ~.73! 23.109 219.125 1,000 36.063 224.375 1.000 202.750 1.000 FSIG GR F$IG GR FSIG GR FSlG GR FSIG GR FSIG GR FSIG F$IG GR F$IG GR FSIG GR FSIG GR 5.789 -999,250 42,469 67,563 17.281 52.094 19.625 14.438 36.9~8 11,250 40.594 13.8~0 49.688 t4.563 55.000 13,242 120.OO0 18.875 68.438 31.844 93.500 30.734 89.938 TRAT BACK TRAT BACK TRAT BACK TRAT bACK TRAT BACK TRAT BACK TRAT BACE TRAT BACK TRAT BACK TRAT BACK TRAT BACK TRAT BACK -999.250 -999.250 3.156 410.000 2.871 407.750 421,250 2.258 427.250 2.189 438.250 2.086 450.250 2.641 470,750 1.659 477.500 3.148 503.750 4.371 489.000 4.594 475.000 LVP 009.M03 VERIFICATION LISTING PAGE ~2 MAXIMUF LENGTH : 1024 FILE TYPE : NEXT FILE NAME : ** TAPE TRAIL~ ** SERVICE NAME :SkRVIC DATk :~1/08/ 8 ORIGIN TAPE NAME CONTINUATION # :01 NEXT TAPE NA~E COMMENTS :TAPE COMHEMTS ** REEL TRAILER ** SERVICE NAME :SER¥IC DATE :81108/ 8 ORIGIN : REEL NAME :REEL ID CONTINUATION # :01 NEX% REEL N~E COMMENTS :REEk COMMENTS ,~*****~** EOF DATA 1,< F.C UkD,S I~F. NGI'tt ti}, LAST l~Ctmo: 518 F Ik, b. IRA/[,ER I,ENG'I'Id: ~2 B~Tk$ t' [l,E NAME: kDl'l .001 ~AXIMUM PHYSICAL PLCURD LENGTH: NkXT tILE. NAME: 1024 BYTES TAPE 'rRAILEP L}.,NGI'lt: I ~2 B~/TES TAPE, NAgE: blOt(} DATE: 80/10/ 5EI~V ICE NAME: EDIT tAFF, CONTINUATION NUP~BE~: Ol NkXT 1APE NAME: CtJ~ME, N~5: UNIQUE WELL IDENTIfiCATION NUMBER 1S 50-029-20497 DE. PTH tlO0.O00 ~000. O00 2900.000 28OO. O00 2700.000 aNLMUNIC GR NPHI SP NPHi FCNL SP G~ NPHI FCNL 8P GR NPH 1 1~ CNI., SP 614 NPHi [,CNL VALUE -75.250 79.125 -999.250-999.250 -92.b88 75.500 -999.25O-999.250 -114.81] 5~.125 -999.250-999.250 -110.500 42.719 -999.250-999.250 -91.875 75.500 -999.250-990.250 -999.250 45.125 -999.250-999.250 EMUNIC ILD GR RHOB 1LD GR RH£]B 1LD GR G~ 1 LD GR RH(]B GR I hD GR GR RHLJB VALUE 2.996 -999.250 -999.250 -999.25o }.18t -999.250 -999.250 -999.250 1.788 -999.250 -999.250 -999.250 2.760 -999.250 -999.250 -999.250 5.705 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 MN ~.MUNIC IbM CAbi NRAT DT IbM CALk NI~AT DT CALl NRAT DT ILM CALl NRAT CALl i4RAI CALl NRAT DT VALUE 2.877 -999.250 -999.250 -999.250 3.314 -999.250 -999.250 =999.250 2.045 -999.250 -999.250 -999.250 3.070 -999.250 -999.250 -999.250 3.391 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 MNeMONiC bhSU DRHU NCN~ DRHU NCNL DRHU NCNL LLSU DRHO NCNb LLSU DRHU NCNb LL8U DRHO NCNL VAbUE 1.971 -999.250 -999.250 3.240 -999./50 -999.250 2.230 -999.250 -999.250 3.705 -999.250 -999.250 2.783 -999.250 -999.250 -999.250 -999.250 -999.250 4200.000 4100.000 4000. O00 39O0. 000 3800.000 3700.000 3600.000 3500.000 5400.000 3300.000 3200.000 NNLM(JNIC SP GR NPHI ~CNL SP NPM] ~ CNb NPHi at-'HI 1' C~L SP GR SP NPHI ~CNb GR NPHi FCNL SP NPHi FCNb SP GR NPtll fCNL SP NPHI FCNL SP GR NPNI fCNL VAL -104 5o -999-999 -88 -999 -999 -140. -999. -999. -82. -999, -999. -90. 70. -999.-999. -132. 54. -q9g.-999. -lOb. bi. -999.-999. -143. 43. -q99.-999. -88. 79. -999.-999. -129. -999. -999. -82. 65. -999.-999. UP. .8 .8 .5 .2 .2 1) 63 5 0 50 75 50 50 50 19 50 50 25 50 5O 38 O0 50 50 O 0 5O 5O 75 31 50 50 5O b9 50 50 0 0 50 50 25 75 5O 5O 38 13 50 50 Mm~MUNIC I hD RHOB GR ILO GR [-{HOB GP IL!.) GP I~HUN GR 1 LD RHOB GR lCD GR GR iLD GR RHUB GR ILL) GR RHOB GR ILO GR RHUB G~ ILD GR RHtJI~ GR 1LO GR RHL}O GR ILO GR RHUB GR VAbU 0 -999. -999. -999. -999. -999. -999. . -999. -999. -999. 0 -999. -999. -999. 0 -999. -999. -999. -999 -999 -999 0 -999. -999. -999. . -999. -999. -999. . -999. -999. -999. -999. -999. -999. . -999. -999. -999. 793 250 250 250 035 250 250 250 100 25O 25O 25O 178 250 250 250 336 250 250 250 031 250 25O 25O 617 250 250 250 248 250 250 250 504 250 250 250 262 25O 25O 25O 082 250 250 250 MNLMUNiC CALl N~AI DT CALl NRAT UT IbM CALl NRAT DI CALl NRA1 ut CALl NRAT D1 CALk NRAI lbl~ CALk NRAT DT IbM CALl DT CALl NRAI DT CALL NRA~ UT IbM CALl NRAT DT VALU -999. -999. -999. 0 -999. -999. -999, 0 -999. -999. -999. . -999. -999. -999. I -999. -999. -999. . -999. -999. -999. . -999. -999, -999. 0 -999. -999. -999. 0 -999. -999. -999. . -999. -999. -999. . -999. -999. -999. 180 ~5o ~50 000 250 250 250 479 25O 25O 25O 758 250 250 250 586 250 25O 25O 365 250 250 250 O59 25O 25O 25O 498 25O 25O 25O 234 250 250 250 568 250 250 250 O55 25O 250 25O MNkMONIC bb8U DRILL) NCNb Lb8U DRHU NCNb bbSU DRHu NCNb LL8O DRHU NCNb bbSU DRHU NCNb LLSO DRHU NCNb bbSU DRHU NCNb bb8O DRHO NCNb bbSU DRHU NCNb bbSU DRHU NCNb bbSU DRHU NCNb VALUE ~.bO9 -999.250 -999,250 4.469 -999.2b0 -999.250 o.010 -999.250 -999.250 4.555 -999.250 -999.250 5.422 -999.250 -9~9.250 ~.215 -999.250 -999.250 5.457 -999.250 -999.250 5.141 -999.250 -999.250 4.551 -999.250 -999.250 4.711 -999.250 -999.250 3.299 -999.250 -999.250 DLf'I'H 5 '100. 000 20O. 000 51 O0. 000 5000.000 4900.000 4800.000 4700·000 ~600.000 4500,000 4400.000 4300.000 3P NPH1 FCNb NPHI ~CNL NPHI FCNL 8P NPHI ,Si-" GP, NPHI ~CNL SP NPMI fCNL SP GR NPHi fCNL SP NPH] ~CNL bP NPHI ~CNI., SP GR NPH] FCNL NPnl fCNL VALU 80. -999. -999. 4t. -999. -999. -117. 58. -999.-999. -87. 68. -999.-999. -101. 53. -999.-999. -131. -999. -999. -139. 37. -999.-999. -129. 43. -999.-999. -136. ]9. -999.-999. -147. 32. -999.-999· -149. 10. -999.-999. 000 313 250 250 000 438 250 250 000 250 250 250 875 875 250 250 b25 813 250 25O 500 125 250 250 125 750 250 250 750 844 250 250 875 625 250 250 875 656 250 250 025 906 250 250 MNf, M{JNiC GR GR G~ GR I i~O GR RHOB IbD GR ILD GR ILD GR GR GR GR GR 1 LD GR GR i6D GR RHtJB GR 1LD RI-IL) B GR ;/Ab[.] i -999 -999 -999 . -999. -999. -999. . -999. -999. -999. · -999. -999. -999. 10. -999. -999. -999. · -999. -999. -999. · -999. -999. -qgg. . -999. -999. -999. · -999. -999. -999. · -999. -999. -999. . -999. -999. -999. 438 250 250 250 188 250 250 250 879 250 250 250 289 250 250 250 000 250 250 250 430 250 250 25O 109 250 250 250 b37 250 250 250 047 250 25O 25O 230 250 250 250 57O 250 25O 25O MNbMUNIC ibm CALl h~Al' DT IbM CALl 16~ CALl NF<Ai ibm CAbi NRA1 IbM CALl NRAI DT CALl NRAT IbM CALk NRAI D~ IbM CALl NRAT 1bM CALl NRAI iLM CALk NRA1 DT IbM CALl N RAI DT VAbUL 4.055 -999.250 -999.250 -999.250 3.795 -999.250 -999.250 -999.250 3.1bO -999.250 -999.250 -999.250 4.227 -999.250 -999.250 -999.Z50 9.b5b -999.250 -999.250 -999.250 2.674 -999.250 -999.250 -999.250 3.398 -999.250 -999.250 -999.250 3.939 -999.250 -999.250 -999.250 3.0Lb -999.250 -999.250 -999.250 3.758 -999.250 -999.250 -999.250 2.813 -999.250 -999.250 -999.250 MNEMUNIC 668U DRHU NCNb 6bBU DRHU NCNb bbBU DRHU NCNb bbBU DRHO NCNb 6680 DRHO NCNb LUBU DRHU NCNb bhBU DRHO NCNb LLBU DRHU NCNb 6680 DRHO NCNb LLBU DRHO NCNb 66BU DRHO NCNb VAbUb 3.514 -999.250 -999.250 2·820 -999.250 -999.250 4.523 -999.250 -99~.250 3.140 -999.250 -999.250 13.011 -999.250 -999.250 3.418 -999.250 -999.250 0.020 -999.250 -999.250 5.809 -999.250 -999.250 4.51b -999.250 -999.250 7.082 -999.250 -999.250 5.313 -999.250 -999.250 0 ¢00. 000 630u.000 e200.O00 6100.000 6000.000 6800.000 57U0.000 5600.000 55O0.0O0 5400.000 MNLMI}N lC 6P GR Ni'MI NPHI ~CNb SP GR ~ CNL G~ NPIt I }, CNL SP NPHI ~CNb 8P G~ NPHI PCNL GR NPHI kCNb SP GR NPHI PCNL G~ NPHI PCNL SP GR NPHI kChL ~P VALUE -77.b25 90.750 -999.250-999.250 -141.000 45.125 -999.250-999.250 -9).750 77.188 -999.250-999.250 -147.250 45.594 -999.250-999.250 -]15.438 57.250 -999.250-999.250 -156.250 39.625 -999.250-999.250 -154.250 ~1.781 -999.250-~99.250 -68.750 67.188 -999.250-999.250 -128.750 43.500 -999.250-999.250 -75.125 72.688 -999.250-999.250 -111.063 ~2.06~ -999.250-999.250 MNb~MUN lC lhD i~HLIB RHOB lED lED GR G~ G~ GR RH(JB GR GR RHUB GR ILL GB GR GR RHL)B GR GR VALU~ -999.250 -999.250 -999.250 2.250 -999.250 -999.250 -999.250 3.945 -999.250 -999.250 -999.250 1.703 -999.250 -999.250 -999.250 2.740 -999.250 -999.250 -999.250 1.002 -999.250 -999.250 -999.250 1.bOb -999.250 -999.250 -99q.250 3.773 -999.250 -999.250 -999.250 1.583 -999.250 -999.250 -999.250 2.990 -999.250 -999.250 -999.250 3.355 -999.250 -999.250 -999.250 MNkMUNIC IbM CALl IbM CALl NRA'I IbM CALl NRAI DT CALl NRAI DI' IbM CALl NRAT DT CALl NRAI IbM CALl NRAI OT CALl NRAI ibm CALl DT CALl NRAI' DT IbM CALl N b',AT DT VAL, U~s -999.250 -999.250 -999.250 2.965 -999.250 -999,250 -999.250 3.783 -999.250 -999.250 -999.250 2.025 -999.250 -999.250 -999.250 2.96~ -999.250 -999.250 -999.250 1.264 -999.250 -999.250 -999.250 1.985 -999.250 -999.250 -999.250 3.863 -999.250 -999.250 -999.250 1.885 -999.250 -999.250 -999.250 2.980 -999.250 -999.250 -999.250 3.430 -999.250 -999.250 -999.250 MNEMUNIC bbBd DI~HO NCNb LLBU DRHU NCNb bbSU DRHU NCNb hhSU DRHU NCNb hhSO DRHU NCNb bbSU DRHO NCNb bbSU DRHU NCnb bbSU DRHO NCNb DRHO NCNb bbSO DRHU NCNb LbSU DRHU NCNb VALUE -999.250 10.656 -9~9.250 -999.250 2.867 -999.250 -999.250 0.762 -999.250 -999.250 5.324 -999.250 -999.250 q.969 -999.250 -999.250 6.367 -999.250 -999.250 2.783 -999.250 -999.250 3.92~ -999.250 -999.2b0 2.40] -999.250 -999.250 3.914 -999.Z50 -999.250 v [) E,P'I H 7500.000 7100.000 7200.000 7100.000 7000. 000 6900.000 ~B00o000 6700.000 6600.000 6%00.000 MN~MUNiC GB NPHI ~CNL SP NPH[ i' CNJ, 6P NPHI SP GR NPH1 J. C~L NPH1 PCNb NPHI ~CNL SP NPtil SP G~ NPHI [~CNL SI-' (,JR NPI~ I 8P GP NPHI ~CNh VAbU =bU. 103. -999. -999. -52. 89. -999.-999. -50. 96. -999.-999. -48. 91. -g99.-999. -50. 77. -99q.-999. -54. ~1. -999.-999. -54. 90. -999.-999. -49. 102. -999. -999. -51. -999. -g9g. -69. -999. -999. -84. 54. -999.-999. 750 125 250 250 531 000 250 250 125 250 250 25O 25O 25O 25O 250 688 250 250 125 375 250 250 000 500 250 250 719 250 250 250 125 813 250 250 500 031 250 250 000 375 250 250 btNkMUN1C ILD 1Lb RH{JB GR ILD GR GR GR HHOB ILD GR GR GR }{HOB GR /LO GR GR ILD GR GR ILD GR GR ILD GR RHUB GR VALU -999. -999. -999. -999. -999. -999. -999. -999. -999. · -999. -999. -999. · -999. -999. -999. -999. -999. -999. -999. -999. -999. . -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. 977 250 250 25O gl0 250 250 250 401 250 250 25O 070 250 250 250 871 250 25O 25O 406 250 250 25O 813 250 25O 250 273 250 250 250 133 250 250 250 5OO 25O 25O 25O 008 250 250 250 MNbMUNIC CALl NRAI CALl ILM CAI: i IbM CALl NRAT CALl NRAI IbM CALl NRAI' CALl NRAT Ol CALl DT CALl NHA£ IbM CALl NRAI D1 i LM CALl NRAi DT VAbU t -999. -999. -999. ° -999. -999. -999. ° -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. -999. . -999. -999. -999. . -999. -999. -999. -999. -999. -999. . -999. -999. -999. . -999. -999. -999. 250 250 250 8bl 250 250 250 391 250 250 250 037 250 25O 250 098 250 250 250 238 250 250 250 797 250 250 250 160 250 250 250 932 250 250 250 6]9 250 250 250 082 250 250 250 MNEMONIC bbSU DRtiO NCNb bbSU DRHU NCNb LLSU DRHO NCNb LLSU DRHU NCNb L68U DRHO NCNb UHHU NCNb bbSU DRHU NCNb 6USU DRHU NCND bhSU DRHO NCN~ hb8U DRHU NCNb bbBU DRHO NCNb VAbU~ -999.250 -999.250 3.012 -999.Z50 =999.250 2.048 =999.250 -999.250 2.244 -999.250 -999.250 4.14b -999.250 -999.250 4.580 -999.250 -999.250 3.010 -999.250 -999.250 3.842 -999.250 -999.250 2.924 -999.250 -999.250 2.949 -999.250 -999.250 3.154 -999.250 -999.250 DI: PI'Id 86(}0,000 850U,000 8400,0u0 8]00.000 ~200.000 a ~ 90. 000 8000,O00 ?900.000 ?800.000 7700.000 lb00,000 M N L~,~ LJN lC Git 5P GH NPH1 SP GH NPH 1 NPH I 8P NPHi I'CNL G~ NPHi i' ('NC SP t~CNL 8P NPHI ["CNG SP GH NPal fCNL ~P NPHI f CNI~ NPMI VALUr. 2o4,B15 -999.250 -999.250 -56.125 170.250 -999.250 -999.250 -53.500 115.68H -999.25O -999.250 -41.250 109.188 -999.250 -999.250 -54.000 145.125 -999.250 -999.250 -49.000 172.500 -999.250 -999.250 -41.625 189.750 -999.250 -999.250 -41.125 ltl.000 -999.250 -999.250 -42.875 165.125 -999.250 -999.250 -43.375 85.025 -999.250-999.250 -48.875 134.250 -999.250 -999.250 M Iq LMONiC ILD HHUB Gl-, ILl) GR RHOB GH 1Lb ILO ILD GR RH(JB lCD ILD GR RHUB 1 LD GH }{HUB lCD GR GR ILD RHOB ILD GR VAb 5 -999 -999 -999 5 -999 -999 -999 7 -999 -999 -999 -999 -999 -999 5 -999 -999 -999 3 -999 -999 -999 2 -999 -999 -999 1 -999 -999 -999 1 -999 -999 -999 2 -999 -999 -999 4 -999 -999 -999 UE .645 .250 .250 .250 .029 .250 .250 .250 .441 .250 .250 .250 .779 .25O .25O .250 .852 .250 .250 .250 .529 .250 .250 .250 .053 .250 .250 .250 .432 .250 .250 .250 .553 .250 .250 .250 .527 .250 .250 .250 .199 .250 .250 .250 MN LMUNiC ibm CALl ibm CALi NRAT UT IbM CALl Ol IbM CALl D[ IbM CALl DT IbM CALl NRAI Ul IbM CALl NHAI DT ILM CALl NRA~ UT IbM CALl DT CALl UT CALl NRAI DI' VAhUL 5.477 -999.25o -999.250 -999.250 5.516 -999.250 -999.250 -999.250 7.254 -999.250 -999.250 -999.250 3.723 -999.250 -999.250 -999.250 5.824 -999.250 -999.250 -999.250 3.561 -999.250 -999.250 -999.250 2.061 -999.250 -999.250 -999.250 1.594 -999.250 -999.250 -999.250 1.634 -999.250 -999.250 -999.250 2.598 -999.250 -999.250 -999.250 4.137 -999.250 -999.250 -999.250 MNEMONIC 66BU DRLIO NCNb 6LSU DRHO NCNb 66Bu DRHU NCNb LLSU ORHu NCNb bLBU DRHO NCNb 6680 DRHU NCNb bbBU DRHO NCNb 6680 NCNb 66BU DRHO NCNb 6680 DRHU NCNb 66BU DRHU NCNb VAbU~ ~.2bb -999.260 -999.250 5.508 -999.d50 -999.250 9.055 -999.250 -9~9.250 3.830 -999.250 -999.250 5.184 -999.250 -999.250 3.70b -999.250 -999.250 1.849 -999.250 -999.250 1.225 -999.250 -999.250 1.299 -999.250 -999.25U 1.7o3 -999.250 -999.250 3.525 -999.250 -999.250 9700. 000 96O0. 000 9500.000 q 400. 000 930O. O00 9200.000 91 O0. 000 9000. 000 8900.000 8800.000 8700.000 MNisMUN lC SP G~ NPH1 ,BP NPH.] i. CNL 8P G~ NPHI t'CNL 6P NPH i 8P GR SF GP NPHI FCNL NI-'H1 ['CNL SP GR ~CNL ~P GP NPHI ~.CNL 8P NPHI FCNL VAL UE -43.3 85.1 -999.2-999.2 75 88 50 50 -48.000 78.813 -999.250-999.250 -42 9~ -999-999 -41 9] -999-999 -39 104 -999 -999 -37. 105. -999. -999. -41. 107. -999. -999. -47. 101. -999. -999. -50. 173. -999. -999. -45. 163. -999. -999. -45. 177. -999· -999. .25(.) .375 .250 .250 .025 .563 .250 .250 .406 .125 .250 .250 75 25 50 50 50 88 50 50 94 75 50 50 25 50 50 50 O0 50 5O 50 50 50 50 50 ILD G~ GR 1LO Gk BHUB 1 LD ILD GR }{HOB GR ILD GR GR ILD RHOB OR ILD GR RHUB ILD GR RHOB ILD GR RHOB ILD RHOB GR 1LD GP RHOB GR VALU -999. -999. -999, . -999. -999. -999. · -999. -999. -999. . -999. -999. -999. I . -999. -999. -999. · -999. -999. -999. I · -999. -999. -999. . -999. -999. -999. 0 -999. -999. -999. 0 -999. -999. -999. o -999. -999. -999. 059 25O 250 250 998 25O 25O 25O 512 250 250 250 308 250 250 250 264 25O 25O 250 500 250 250 25O 460 250 25O 250 990 25O 250 25O 414 25O 250 25O 486 250 250 250 262 250 250 25O MNkMUN lC CALl NRA'i D1 IbM CALl NRA7 UT CALk NRA'I Df CALl NRAI ibm CALl NRAf DT CALl 1LM CALl N~AT CALl NRAI uT ILM CALl NRAI DT CALl N R A 1 ILM CALl NRA~I uT VALUL 3.111 -999.250 -999.250 -999.250 3.018 -999.250 -999.250 -999.250 1.558 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 1.341 -999.250 -999.250 -999.250 1.571 -999.250 -999.250 -999.250 1.502 -999.250 -999.250 -999.250 2.984 -999.250 -999.250 -999.250 4.734 -999.250 -999.250 -999.250 2.525 -999.250 -999.250 -999.250 4.129 -999.250 -999.250 -999.250 MNEMUNIC i.,hSU DRHU NCNb bLeU DRHO NCNb bhSU DRHU NCNb LLeU DRHU NCNb LLSU DRHU NCNb LLSU DRHU NCNb bbSU DRHU NCN6 bhSU DRHO NCNb bL8U DRHU NCNb bleu DRHU NCNb DRHU VA6Uk 2.492 -999.250 -9~9·250 2.J05 -999.250 -999.250 1.127 -999.250 -999.250 1.029 -999.250 -999.250 1.063 -999.250 -999.250 1.221 -999.250 -999.250 1.110 -999.250 -999.250 2.213 -999.250 -999.250 4.031 -999.250 -999.250 1.100 -999.250 -999.250 2.980 -999.250 -999.250 DLP1 H 0800. 000 IO700.000 10h00o000 10500.o00 10~00.000 10:~00.000 10700.000 10100,000 10000.000 9900.000 9800.000 MN LblUN 1C SP Git NPHi PCNL SP {JR N PH 1 bCNb 6P NPH I FCNL SP NPHI ~CNL bP NPHI FCNL SP NPHI ~CNL ~P GR NPNI FCNL SF Gh NPHI 8P GR FCNL 8P NPHI ~CNL, SP NFH I F CNh VALUE -10.313 10b.4S8 ~2.129 ~96.000 -28.315 109.750 -999.250 -999.250 -2b.875 128.000 -999.250 -999.250 -22.625 124.875 -999.250 -999.250 -28.375 93.188 -999.250-999.250 -31.750 105.813 -999.250 -999.250 -35.000 86.750 -999.250-999.25o -31.750 113.750 -999.250 -999.250 -]2.]75 119.000 -999.250 -999.250 -]3.375 105.250 -999.250 -999.250 -39.875 8J.250 -999.250-999.250 MN EMUN1C lCD RHUB RHUB GR lCD GR RHOB G~ lCD RHUB lCD lCD GR ILD RHOB GE GE ILD RHOB GR GR VA6 I 97 2 91 1 -999 -999 -999 1 -999 :999 999 1 -99g -999 -999 2 -999 -999 -999 2 -999 -999 -999 2 -999 -999 -999 -999 -999 -999 1 -999 -999 -999 ! -999 -999 -999 2 -999 -999 -999 tie .520 .000 .514 .438 .727 .250 .250 .250 .723 .250 25O '250 .416 .250 .250 .250 .779 .250 .250 .250 .559 .250 .250 .250 .725 .250 .250 .250 .497 .250 .250 .250 .467 .250 .250 .250 .655 .250 .250 .250 .604 .250 .250 .250 MN LMON 1C IbM CALl N IR A T DI' IBM CALl NRA*I DT IbM CALl DT CALl NRAT CALl NRA1 ILM CALl NRAT PT CALI NRA1 PT IbM CALl NRA/ {31 ibm CALl NRAI {31 IbM CALl NRAT iBM CALI NRA~I VAbOk 1.585 10.898 3.346 101./50 1.845 -999.250 -999.250 -999.250 1.818 -999.250 -999.250 -999.250 1.451 -999.250 -999.250 -999.250 2.861 -999.250 -999.250 -999.250 2.014 -999.250 -999.250 -999.250 2.793 -999.250 -999,250 -999.250 1.558 -999,250 -999.250 -999.250 1.541 -999.250 -999.250 -999.250 1.112 -999.250 -999.250 -999.250 2.645 -999.250 -999,250 -999.250 MNEMONIC 66BU DRHU NCNb 6hBO DRHU NCNb bBBU DRHO NCNb 6bBO DRHU NCN6 6680 DRHO NCNB 66BU DRHU NCNb 6680 DRHU NCNb 6bBO DRHU NCNb hhBO DRHO NCNb bbBO ORHU NCNb 6680 NCNb VAbU~ 2.939 0.000 1850.O00 2.055 -999.250 -999.250 1.131 -9~9.250 -999.250 1.320 -999.250 -999.250 2.510 -999.250 -99~.250 2.033 -999.250 -999.250 2.199 -999.250 -999.250 1.325 -999.250 -999.250 1.313 -999.250 -999.2b0 1.449 -999.250 -999.250 2.053 -999.250 -999.250 1 I 80~. 000 11 ~00. 000 1 ! 700.000 1)600.000 11500.000 11~00.000 1 I 300. 000 112OO.000 11100.000 11000.000 10900.000 MN l~tqtJ N lC SP GP, NPH 1 8P NPHI b CNIJ ,SP Gk 6P NPHI FCNt. GR NPHI SP G~ NPHI ? C Nb GR NPH1 $P NPHI t' C N b GP NPHI i. CNI, 8P NPHI F CNI, 8P NPH1 ['CNb VAL -3O 114 761 114 29 /bi -29 109 21 790 -80 18 1211 -bO 64 21 1251 -111 17 20 lo29 -107 20 16 1948 -14 20 8 2954 -95 2] 21 1321 -~t lb9 4 4200 -7] 51 22 1197 .875 .31~ .398 .500 ,2~4 ,513 .500 .125 .625 .539 ,500 .563 .65b .799 .000 .250 ,438 ,924 ,000 .406 .020 .000 .06~ .391 ,064 ,000 .b25 ,922 .691 .000 .000 .281 .045 .000 .344 .125 .541 .000 .25u .188 .55q .000 MN bMONIC ILD RHUB GR lied GR RHUB bP, ILD GR RMUB GR I LD GA 1LD GA GE 1LD GR RH(JB Gl.< ILD GR GR RHDB ILD GE GR ILD ~HOB GP RHUB OR VAL 2 110 2 101 2 110 2 101 104 2 108 40 2 44 64 2 57 2 16 2 14 UL .965 .438 .420 .938 .965 .438 .481 .938 .654 .625 .559 .813 .0]9 .375 .438 .625 .965 .750 .541 .56t .605 .484 .268 .125 34.250 19.]59 2.~09 17.516 40 26 21 29 lq 2 2i 64 152 2 163 15 48 2 46 .063 .422 .480 .125 .125 .766 .246 .250 .000 .875 .578 .125 .680 .063 .29] .75O NNLMUNiC CALl NRA'I UT ILM CALl NBAT bl CALl NRAI UT ILN CALl NRAI Ib~ CALl NI~AI DT IBM CALl NRAI CALl N RA'I ILM CALl NRAT UT CALl NRA [' ibm CALl NRAI DT ibm CALl NRA~ UT VAbUL 2.912 2.689 2.87'/ 90.563 2.918 6.506 2,877 90.56~ 3.768 9.188 2.910 85.750 3.266 8.547 2.275 89.375 4.277 ~.578 2.486 79.750 2.959 8.422 2.]46 89.750 25.703 8.516 2.086 88.000 29.797 8.633 1 72.56] 20.375 8.641 2.434 95.150 61.031 9.875 1.424 57.188 8.977 2.501 93.000 MNNMUNIC bbSO DRHU NCNb bbSO NCNb bhSO DRHO NCNb bbSO DRHU NCNb bbSO DRHU NCNb bhSO DRHU NCNb bb8U DRHU NCNb bbBO DRHU NCNb bbBU DRHO NCNb bbSU DRHU NCNb DRHU NCNb ~.000 0.011 2294.000 3.982 0.045 2294.000 5,398 0.066 2390,000 9.781 0.020 ]064.000 10.172 0.035 3182.000 11.047 0,003 ]94B.000 44,7Ul 0,003 4360.000 90.563 0.00O 4936.000 36.8~4 0.005 3380.000 274.250 -0.017 b108.000 zl.7~ 0.006 317o.000 DAqU~ 6PkCIflCATIUN ~k, iJC~,5: I;IA~41~. IUtJL UNI'f hPI AP1 AP1 APl [;1Lb SIZE SAM HI, It' PROCESS INDICATLiRS USk,R DkFINI:D OUIPUT AIeRA~f OUTPUT 8P Al 2 UUTPU r I LD Al zt OUYPt~T I b~ a'l 4 OOIPUT LLSU A'[ 5 OUTPUT Gh A~ 7 O~TPUT CALl AT ~ OUTPUT DRHU AT 9 OUTPt;'[' NPHI A'I 10 UU~PUI ktlUB AT 11 UUTPIIT NPA'I A~ 12 UUTPIJT NCNb AI' lJ OU ~Pi~T ~CNL Al 1~ OU'r['UT (;~ A~ 15 OUTPUT PT A'I 16 DAIA ['tI~NA.I. bPI".CJI"ICAIIIJN LflIRY BLUCk.S: 0 IR L 1-' CODL 0 l~l~ VEH~IUh ~5.HO1 1~/03/26 5CHDUMBEI4GLi< COMPUTING 10707,61010 1-', P_, L h HEADER PALL: 80/10/ FAPL MEADbP LENGIIq: 132 OYTF,$ I'APE NAME: 61.030 UAl'E: 80/101 b SLRV ICL NAM?.: EDIT TAPE CONTINUATION NUMDkh: 01 PRLVIOU5 ~APL NAME: COMMENI'S: UN LOUL WELL iDLNTI~tCAI~ION NUMBER i6 50-0Z9-20497 TA~L COMMENTS CSNG DHILL~B 9.629~47 D~/~I'I' SIZE ~.5/~LUID GEL-P[JL~/D~NS 9.5/ VISC ]5/PH 9/~LUID bSS 5.8 MI/~M8 3.52~68 DF/RMC 2./4062 D~/ F 1EL MLADER B ILL NAME: LDII .001 MAXIMUM PHYSICAL RLCUHD LENGTH: 1024 BYIE$ FRLVIUU5 FILL NAME: ~ lbL COMMENTS bL-Btl FROM BUTTUM ()~ HULk UP TO 107bO, AND SF'LU TtJ ~OP O~ HOLE COME'ANY : St) HlO AhASKA PL'lle(}. WLLi, : J- 13 Flkbll : PRUDHUL ~A~ HANGL : 13L TOWNSH IF : 1 I N 6LC I'tUN : 9 COUNTY : N. 8b{~Pk, SI'ATk~ : ALASKA DLNStFY : 800. 11 000000 7777777777 11 000000 7777777777 1111 00 00 77 1111 O0 O0 77 11 O0 0000 77 11 O0 0000 77 11 O0 O0 00 77 11 O0 O0 O0 77 11 0000 O0 77 11 0000 00 77 11 O0 00 77 11 O0 O0 77 111111 000000 77 llllll 000000 77 000000 000000 O0 O0 oO OO O0 OOO0 00 0000 O0 O0 O0 o0 OO O0 0000 O0 0000 O0 O0 O0 O0 O0 o00000 000000 7777777777 777777t777 77 77 77 77 77 77 77 77 77 77 ~7 77 b06066 11 000000 660666 11 000000 6o 1111 O0 O0 66 1111 O0 O0 66 11 O0 0000 66 11 O0 0000 ObbbbOb~ 1.1 O0 O0 O0 666bbbb6 11 O0 O0 O0 66 66 1l 0000 O0 66 66 11 O00O 00 66 66 11 00 O0 66 66 11 O0 O0 bbbbb6 llllll O0000O 6066~6 111111 000000 333333 333333 33 33 33 33 33 33 33 33 33 33 33 33 33 33 333333 333333 000000 000000 00 00 00 00 00 0000 O0 0000 00 00 00 00 00 00 0000 00 00OO O0 00 00 00 00 000000 000000 SSSS S S SSS S S SSSS ~~ 1., PPPP RRRR U U DDDD F b P P R ~ U U D D F I, P P ~ R U U D D ~ I., - .... PPPP RRRR U O D D ~ L P R ~ O U D D F L P ~ ~ U O O D ~ LLLLL P R ~ UUUUtJ DDDD H H O 0 E H B UOO ~EEEE qSTART* *STARt * MON l 'rt)R USER PCAb [10707,b1030] dro6 SHiP bwS KLIOE40 8EP-80. *SIAl-if* _ UShR PCAI, [10701,61030] dUB 8w8 1',1,101:,40 SEP-SO. ,STAIeT* SHiP SEQ. 7666 DATE 07-uC1'-80 7666 DA'£h 07-UCT-80 17:24:44 17:24:44 Illl IIII 11 Ii I1 II 1I 11 1i i1 II iii1 11 II II II PPPPPPPP PPPPPPPP PP PP PP PP PP PP PPPPPPPP PPPP~PPP PP PP PP PP T~T1 TTT! rTTT ] '1 UUUUUU '1 T 1"i '1 'l UiItltjlJl.I TT (J(j U(J I T tJ[~ 3'[' oEJ ]', ]', {J[j I'T [JO I'T Ob 'I T U(J bO TI' rio Df.J '1 T LIU L,ILJ T [' (]0 (}{J I'T UlJ L}LJ(J{J I'T {_)OOOI.}ll *STARI* USER PCAL [10701,b1030J dob SHiP SEO. 76{)6 DAT~ 07-UCT-80 MLJNJFIJR SwS KLlOh40 SEP-80. *START* ~lbk: DS~HISHIP 1(J<255>[10707 010301 CRhAIED: 06-UCT-80 03101:33 ~RINTE6: 07-(~CT-UO 1~:25:0b /6PACING:I /DIMIT:135 /FORMS:NURMA5 17:24:44 PC'CC '.['HANKS SttIPP]NG I NSTF'UCllONfi 15SUED t~-OCT-80 ¢)3: 01 !~ SE 1~ PCC'C 111III 1iiii1 II 1! 1I 11 I1 I1 ii 1I 1111II Illiii 000000 OUO000 ~4 44 000000 OUO()O0 q4 44 O0 O0 O0 O0 44 44 O0 O0 O0 O0 44 44 00 uO00 00 0000 44 44 00 0000 O0 0000 q4 44 O0 O0 OO 00 OO O0 4q444444 O0 OD O0 ~0 O0 O0 ~4444~44 0000 OO 000~ O0 44 0000 O0 0000 o0 44 O0 O0 O0 O0 44 O0 O0 O0 O0 44 000000 0o0000 44 000000 000000 44 44 44 ,$IARI, USER PCA6 [10701,b1030] dub SHiP bEO. PH1N'rED: 07 IIC3 80 17:25:15 /SPACING:I /blMlr:l ~5 /~ORMS:NORMAL 7666 PAIL 07-UCT-80 07-UC 1~-80 17:18:13 17:24:44 4:4: 41:4c 4:~4~4: 4:4:4:4:4:~ 4:~4:4: 4: 4:4: 4:4: 4: 4: 4: 4:4:4:4: ALASKA COlilPUTING CENTER CO#PANY NAME : BP EXPLORATION WELL NAME : J-~-l! CZZ-03-11-13) FIELO NAME : PRUDHOE BAY 80ROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-20497 REFERENCE NO : 73871 LIS TAPE VERIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER 29-MAY-1990 13:12 **** REEL HEADER SERVICE NA#E : EDIT DATE : 90/05/29 ORIGIN : FLIC REEL NAME : 73871 CONTINUATION ~ : PREVIOUS REEL COMMENT :BPt PRUDHOE BAY~ J-13 (22-03-11-13)~ AP! ~50-029-20497 ~,~ TAPE HEADER **~ SERVICE NAME : EDIT DATE : 90/05/29 ORIGIN : FLIC TAPE NAME : 73871 CONTINUATION t : 1 PREVIOUS TAPE : COMMENT :BPt PRUDHOE BAY, J-13 C22-03-11-13), API ~50-029-20497 ~ FILE HEADER FILE NAME : EDIT o001 SERVICE : FLIC VERSION : 001A04 DATE : 90/05/29 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE PAGE: SCHLUMBERGER gELL SERVICES COMPANY NAME: BP EXPLORATION #ELL: J-13 (22-03-11-13) FIELD: PRUDHOE BAY BOROUGH: NORTH SLOPE STATE: ALASKA API NUMBER: 50-029-20497 LOCATION: 1048e SNL & 804" gEL SECTION: 9 TOWNSHIP:* 11N RANGE: 13E PERMANENT DATUM: MSL ELEVATION: 0 LIS TAPE VERIFICATION LISTING SCHLUMBERGER ALASKA CO#PUTING CENTER 29-.MAY-1990 13:12 LOG MEASURED FROM KB 65 ABOVE PERMANENT DATUH ELEVATIONS KB: 65 DF: 64 GL: 37-7 DATE LOGGED: RUN NUMBER: TO DRILLER: TO LOGGER: 1T-MAY-1990 1 11704 11702 CASING 1: CASING 2: TUBING: TAILPIPE: 5/8" 47 LB a DRILLER DEPTH OF 0 TO 10780 29 LB a DRILLER DEPTH OF 10265 TO 11795 26 LB a DRILLER DEPTH OF 0 TO 10226 1/2= 12o6 LB ~ DRILLER DEPTH OF 10226 TO 10333 BIT SIZE 1: 12 1/4' BIT SIZE 2: 8 1/2N TYPE FLUID IN HOLE: PRODUCED FLUIDS TIME LOGGER ON BOTTOM: 09:30 17-HAY LOGGING DISTRICT: 4615 LOGGING ENGINEER: JOHNSON #ITNESS: HHITLO~ TOOL NUMBERS: CNC-DA-101 CAL-UB-299 ATC-CB-1152 ATH-AA-374 FIELD REMARKS: TIED INTO BHCS DATEO 9/28/80 HELL SHUT IN AT 0100 5/17/90 SIHHP= 2450 PSIG RAN A 2.5= CNT ON LIMESTONE MATRIX DATE JOB STARTEO: 26-MAY-90 JOB REFERENCE NO: 73871 LOP/AHA: KOHRING PAGE: FILE - EDIToO01 BP EXPLORATION PRUDHOE BAY J-13 (22-03-11-13) 50-029-20497 DATA SAHPLEO EVERY -o5000 FEET LIS TAPE VERIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER Z9-MAY-1990 13:12 PAGE: DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NAME NPHI.HLA HODGES-LEYMANN AVERAGED NPH! CNT-A/D/H .PS1 COMPENSATED NEUTRON CNT-A/D/H .P$2 COMPENSATED NEUTRON CNT-A/O/H oPS3 COMPENSATEO NEUTRON CNT-A/O/H oPS4 COMPENSATEO NEUTRON 11699t TO 10794t 11699~ TO 10794* 11699e TO 10T93e 11699~ TO 10T80~ 11699~ TO 10T95~ TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION COMPANY NAME FN P RUDHOE BAY WN ,I-13 C22-03-11-13) APIN 50-029-,?.0497 FL 1048e SNL & 804e gEL SECT 9 TOHN 11N RANG 13E COUN NORTH SLOPE STAT ALASKA NATI USA I/ITN MHITL01/ SON 350061 PDAT MSL EPO FT 0 o LMF KB APD FT 65. EKB FT 65 o EOF FT 64° EGL FT 37°7 TOD FT 11704° BLI FT 116990 TL! FT 10800. TLAB 09:30 1T-NAY FI ELD NAME NELL NAME API SERIAL NUMBER FIELD LOCATION SECTION TOHNSHIP RANGE COUNTY STATE OR PROVINCE NATION gXTNES~e NAME SERVICE ORDER NUMBER PERMANENT OATUM LOG MEASURED FROM BOTTOM LOG INTERVAL TOP LOG INTERVAL TIME LOGGER AT BOTTOM TABLE TYPE : CURV DEFX DEPT DEPTH CHANNEL NAME NPHZ NEUTRON POROSITY NPHX NEUTRON POROSITY TNRA CALIBRATED THERMAL NEUTRON RATIO LIS TAPE VERIFICATION LISTING 29-1qa1'-1990 13.'12 SCHLUMBERGER ALASKA COMPUTING CENTER DEFI RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR GAMMA RaY TENS TENSION CCL CCL AMPLITUOE NPH! NEUTRON POROSITY TNRA CALIBRATEO THERMAL NEUTRON RATIO RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR GAMMA RAY TENS TENSION CCL COL AMPLITUOE NPH! NEUTRON POROSITY TNRA CALIBRATED THERMAL NEUTRON RATIO RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR GAMMA RAY TENS TENSION CCL CCL AMPLITUOE NPH! NEUTRON POROSITY TNRA CALZBRATEO THERMAL NEUTRON RATIO RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR GAPINA RAY TENS TENSION CCL CCL AMPLITUDE PAGE: DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ~ TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 152 4 66 1 5 66 6 73 · 65 8 68 0o5 LIS TAPE VERIFICATZON LISTING SCHLUMgERGER ALASKA CONPUTZNG CENTER 29-MAY-1990 13:12 PAGE: TYPE REPR CODE VALUE 9 65 FT 11 66 6 12 68 13 66 0 14 65 FT 15 66 68 16 66 ! 0 66 0 · ~ SET TYPE - CNAN ~ NAME SERV UNIT SERVZCE AP! AP! APX AP! FILE NUMB NUMB SZZE REPR PROCESS ID ORDER e LOG TYPE CLASS NOD NUMB SAMP ELEM CODE CHEX) TENS PSZ LB 350061 41 CCL PSZ V 350061 42 NPH! PS3 PU 350061 TNRA PS3 350061 42 RCNT PS3 CPS 350061 ,Z RCFT PS3 CPS 350061 ,2 CNTC PS3 CPS 350061 42 CFTC PS3 CPS 350061 42 OR PS3 OAP[ 350061 42 TENS PS3 LB 350061 CCL PS3 V 350061 NPH! PS, PU 350061 TNRA PS, 350061 000 O0 0 I I I 4 68 0000000000 000 O0 0 I I I 4 68 0000000000 890 O0 0 1 I I ¢ 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 Ol 0 1 1 I ~ 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 O00OO00000 310 01 0 I I I 4 68 0000000000 635 21 0 I 1 I 4 68 0000000000 150 01 0 1 I I 4 68 0000000000 890 O0 0 I I I 4 68 0000000000 420 O! 0 I I I 4 68 0000000000 420 '01 0 I I I ¢ 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 310 01 0 I I I 4 68 0000000000 635 21 0 I I I 4 68 0000000000 150 01 0 I I I 4 68 0000000000 890 O0 0 I I I 4 68 O000OO0000 420 01 0 I I I ~ 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 O1 0 I I 1 4 68 0000000000 310 01 0 I I I 4 68 0000000000 635 21 0 I I I 4 68 0000000000 150 01 0 I I I 4 68 0000000000 890 O0 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 01 0 I I I 4 68 0000000000 420 Ol 0 1 1 I 4 68 0000000'000 310 01 0 I I I ~ 68 0000000000 635 21 0 I I I 4 68 0000000000 LIS TAPE VERIFICATION LISTING 29-NAY-1990 13:12 SCHLUMBERGER ALASKA COHPUTING CENTER NAME SERV UNIT SERVICE AP! AP! API AP! FILE NU#B NURB SIZE REPR PROCESS ID ORDER ~t LOG TYPE CLASS HOD NUNB SANP ELEH CODE CHEX) CCL PS~ V 350061 42 150 01 0 I I I 4 68 0000000000 PAGE: DATA DEPT. 11726.500 NPHI.HLA 24.561 NPHIoPS1 -999.250 TNRA.PS1 RCNT.PS1 -999.250 RCFT.PS1 -999.250 CNTC.PS1 -999.250 CFTC.PS1 GR.PS1 -999.250 TENS.PS1 -999.250 CCL.PS1 -999.250 NPHIoPS2 TNRAoP52 -999.250 RCNT.PS2 -999.250 RCFToPS2 -999.250 CNTC.PSZ CFTC.PS2 -999.250 GR.PSZ -999.250 TENS.PS2 -999.250 CCL. PS2 NPHZ.PS3 -999.250 TNRA.PS3 -999.250 RCNT. P$3 -999.250 RCFToPS3 CNTC.PS3 -999.250 CFTC.PS3 -999.250 GR.PS3 -999-250 TENS.PS3 CCL.PS3 -999.250 NPHI.PS4 -9990250 TNRAoPS~ -999.250 RCNT.PS~ RCFToPS~ -999.250 CNTC.PS4 -999.250 CFTC.PS~ -9990250 GR.PS~ TENS.PS4 -999.250 CCL.PS4 -999.250 DEPT. 11700.000 NPHI.HLA 31.055 NPHI.PS1 32.99~ TNRA.PS1 RCNT.PS1 2A5~.79~ RCFT.PS1 ~61o395 CHTC.PS1 25~3.0A8 CFTCoPS1 GR.PS1 38.781 TENS.PS1 1280.000 CCL.P$1 0.000 NPHI.PS2 TNRA.PS2 5.753 RCNT.P$2 2500.465 RCFToPS2 409.506 CNTC.P$2 CFTC.PS2 443.340 GRoPS2 31.781 TENS.PS2 1305.000 CCL.PSZ NPHZ.PS3 30.660 TNRA.PS3 5.572 RCNT.PS3 2454.545 RCFT.PS3 CNTC.PS3 2495.109 CFTC.PS3 446.253 GR.PS3 38.438 TENSoPS3 CCLoPS3 0.000 NPHI.PS4 28.33~ TNRA.PS4 5.305 RCNToPS~ RCFT.PS~ 462.874 CNTC.PS4 2561.880 CFTC.PS4 4780495 GR.PS~ TENS.PS& 1325.000 CCL.PS& 0o000 DEPT. 11600.000 NPHZoHLA 2A.316 NPHI.PS1 23.456 TNRA. PS1 RCNT.P$1 3214.88& RCFT. P$1 7280625 CHTC.PS1 3341.404 CFTCoPS1 GR.PS1 32.969 TENS.PS1 1255.000 CCL. P$1 0.000 NPHI.PS2 TNRA.PSZ ~.910 RCNT.PSZ 32420424 RCFT. PSZ 684.651 C#TC.PSZ CFTC.PS2 674.28~ GR.P$2 40.625 TENS.PSI I245.000 CCL.PS2 NPHI.PS3 23.048 TNRAoP$3 ~.677 RCNT.PS3 3181.818 RCFT.PS3 CNTC.PS3 3298.183 CFTC.PS3 703.055 GR. PS3 32.000 TENS.PS3 CCL.PS3 0.000 NPHI.PS~ 25.913 TNRA.PSA 5.022 RCNT.PS~ RCFT. PS~ 696.970 CNTC.P$4 3392o10~ CFTC.PS~ 671.325 OR.PS4 TENS.P$~ 1325.000 CCL.PS~ 0.000 DEPT. 11500.000 NPHI.HLA 25.391 NPHI.PS1 25.240 TNRA.PS1 RCNT.PS1 3332.023 RCFT.PS1 672.673 CNTC.PS1 34340283 CFTC.PS1 GR.P$1 35.031 TEN$.P~I 1295.000 CCL.PS1 0.000 NPHZ.PS2 TNRA.PS2 5.035 RCNT.PaZ 33630636 RCFT. P$Z 699.535 CNTCoPSZ CFTC.PSI 684.175 GR.PS2 41.938 TENSoP$Z 1290.000 CCLoP$2 NPHZ.P$3 25.452 TNRA.PS3 4.967 RCNT.PS3 3214.88~ RCFT.PS3 CNTC.PS3 3423.565 CFTC.PS3 684.800 GR.PS3 37.969 TENS.PS3 CCL.PS3 0.000 NPHI.PS4 24.979 TNRAoPS4 4.910 RCNT.PS~ RCFT.PS~ 681.818 CNTC.PS4 3465.648 CFTC.PS~ 697.509 GR.P$~ TENS.P$~ 1310.000 CCL.PS4 0.000 -999.250 -999.250 -9990250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 5.830 438.280 32.305 2528.TZ0 00000 446.512 1285.000 2422.812 41.84¢ 4.727 701.324 24~.973 3331.977 0.000 727.273 1240.000 3270.97~ 4,3.000 4.942 687.335 26.022 3466.874 0.000 713.755 1270.000 3393.939 37.656 LIS T~.PE VERIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER DEPT. 11400.000 NPHZ.HLA RCNT.P$Z 3597.587 RCFT.PS1 GR.P$1 16.094 TENS.PS1 TNRA.PSZ 40638 RCNToPS2 CFTC.PS2 817.647 GR.PS2 NPHXoPS3 14.369 TNRA.PS3 CNTCoP$3 3797.199 CFTC.PS3 CCL.PS3 0o000 NPHX.PS4 RCFT.PS4 833.173 CNTC.P$4 TENS.PS4 1355.000 CCL.PS4 DEPT. 11300°000 NPHZ.HLA RCNT.P$1 4432.220 RCFT.PS1 GR.PS1 23.391 TENS.PS1 TNRA.PS2 4.043 RCNT.PS2 CFTCoPSZ 1177.171 GR.PS2 NPHZoP$3 17.944 TNRAoP$3 CNTC.PS3 4902.279 CFTCoPS3 CCL.PS3 00000 NPHZ.PS4 RCFT.PS4 1095.468 CNTC.PS4 TENS.PS4 1350.000 CCL.PS4 DEPT. 11200.000 NPHZ.HLA RCNToP$1 4306.483 RCFT.PS1 GR.PS1 ZT.T03 TENSoPS1 TNRAoPSZ 4.121 RCNT.PS2 CFTC.P$Z 1255.219 GR.PSZ NPHZ.P$3 20.016 TNRA. PS3 CNTC.PS3 4945.730 CFTC.PS3 CCL.PS3 0.000 NPHX.PS4 RCFT.PS4 1196.970 CNTC.PS4 TENS.PS4 11500000 CCL.P$4 DEPT. 11100.000 NPHZ.HLA RCNT.PS1 4562.438 RCFT.PS1 GR.PS1 15.422 TENS.PS1 TNRA.PS2 4.816 RCNT.PS2 CFTC.PS2 984.336 GR.PS2 NPH/.PS3 26.182 TNRAoPS3 CNTC.PS3 4646.171 CFTC.PS3 CCL.PS3 0.000 NPHZ.PS4 RCFT.PS4 1033.751 CNTC.P$4 TENS.PS4 1265.000 CCL.PS4 DEPT. 11000.000 NPHZ.HLA RCNT.P$1 5Z16.451 RCFToPS1 GR.PS1 90.375 TENS.PS1 TNRA.PSZ 30132 RCNT.PS2 CFTC.PSZ 1768.480 GR.PSZ NPHXoP$3 11.573 TNRA.P$3 CNTC.PS3 5551.484 CFTC.PS3 CCL.PS3 0.000 NPHZ.PS4 RCFT.PS4 1728.062 CNTC.PS4 TENS.PS4 1290.000 CCL.PS4 29-#AY-1990 13:12 22.803 NPHZ.PS1 849.557 CNTC.PS1 1335.000 CCL.PS1 3610.415 RCFT.PS2 13.641 TENS.PS2 40837 RCNT. PS3 792.622 GR.PS3 22.754 TNRA.PS4 3805.795 CFTC.PS4 0.000 18.750 NPHZ.PS1 1100.197 CNTC.PSI 1290.000 CCL.PS1 4526.522 RCFToPS2 22. 813 TENS.PS2 4.034 RCNT.PS3 1161.795 GR.PS3 19.916 TNRA. PS4 4889.508 CFTC.PS4 0.000 19.481 NPHZoPS1 1210.216 CNTCoPS1 1190.000 CCL.PS1 42:60°260 RCFT.PSZ 17.219 TENS.PSZ 4.300 RCNT.PS3 1244.208 GR.PS3 20.389 TNRA.PS4 /1,985.180 CFTC.PS4 O.OO0 24.414 NPHZ.PS1 958.743 CNTC.PS1 1235.000 CCLoPS1 4.337.917 RCFT.PS2 180188 TENS.PS2 5.054 RCNT.PS3 934,.008 GR.PS3 22.391 TNRA.PS4 4667.649 CFTC.PS4 0.000 11.475 NPHZ.PS1 1681.729 CNTC.PS1 1250.000 CCL.P$1 5184.185 RCFT.P$2 90.875 TENS.PS2 30173 RCNT. PS3 1747-265 GRoPS3 110671 TNRA.PS4 5413.111 CFTC.PS4 00000 22.880 37830569 0.000 816.617 1260.000 3672.131 17.094 4.641 822.832 19.166 4784.953 0.000 1249.759 1295.000 4636.363 13.119 4*.287 1105.563 19.076 5002.898 0.000 124.2.871 1300.000 ¢424.242 27.719 4.347 1296o096 24.946 4*643.305 0.000 1021.611 1270.000 43810870 180156 4*0596 1015.091 11.427 5641 °228 0o000 1699.115 1280.000 5338.4T6 80.063 3.187 1711.042 TNRa. PS]. CFTC-PS1 NPHX.PS2 CNTC. PS Z CCL.P$2 RCFT.PS3 TENS.PS3 RCNT. PS4 GR. PS4 TNRA.PS1 CFTC.PS1 NPHX.PS2 CNTC.PS2 CCLoPS2 RCFT. PS3 TENS.PS3 RCNToPS4 GR.PS4 TNRA.PS1 CFTC.PS1 NPHX.PS2 CNTC.PSZ CCLoPS2 RCFT.PS3 TENS.PS3 RCNT.PS4 GR.PS4 TNRA.PS1 CFTC.PS1 NPHI.PS2 CNTC.PSZ CCL.PS2 RCFToPS3 TENS.PS3 RCNToPS4 TNRA.PS1 CFTC.PS1 NPHX.PSZ CNTC.PS2 CCLoPSZ RCFT.PS3 TENSoPS3 RCNToPS4 GR.PS4* PAGE: 4°656 817.515 22.728 3818.685 0.000 771.456 1295.000 3548.698 17.625 4.192 1112.74.5 18,007 484.1.554 00000 1180.700 1300.000 ¢84*8.4*84 25.234 4.180 1309.033 18.610 4769.036 0.000 1218.901 1255.000 4666.666 30.781 4..907 957.528 24.194 4654.201 0.000 956.606 1275.000 4424.24*2 20.188 3.153 17560951 11.180 5557.960 0.000 1712.633 1270.000 4*999.035 90.375 LIS TAPE VERIFICATION LISTING SCHLUM6ERGER ALASKA COMPUTING CENTER DEPT. 10900.000 NPHZ.HL& RCNT.P$1 3897.839 RCFToPS1 GRoPS1 33.625 TENS.PS1 TNRA.PSZ 4.925 RCNT.PS2 CFTC.PS2 812.625 GR.PS2 NPHI.PS3 26.358 TNRA.P$3 CNTCoPS3 40030928 CFTC.PS3 CCLoPS3 0.000 NPHI.PS4 RCFT.PS~ 817.743 CNTC.PS4 TENS. PS4 1240.000 CCL.PS4 DEPT. 108000000 NPH! HLA RCNT.PS1 2501.002 RCFT:PS1 OR.PS1 60.594 TENS.PS1 TNRAoPS2 6.622 RCNT.P$2 CFTC.PSI 379.782 GR.PSZ NPHZoPS3 41.987 TNRAoPS3 CNTC.PS3 25610678 CFTC.PS3 CCL.PS3 O.O00 NPHIoPS4 RCFT.PS~ 339.768 CNTC.PS4 TENS.PS4 1225.000 CCLoPS4 DEPT. 107790000 NPHI.HL& RCNToPS1 -999.250 RCFToPS1 GRoP$1 -999.250 TENS.PS1 T~RA.PS2 -999.250 RCHToPS2 CFTC.PSI -999.250 GRoPS2 NPHI.PS3 -999.250 TNRAoPS3 CNTC.PS3 -999.250 CFTC PS3 CCL.PS3 -999.250 NPHI~PS4 RCFToPS~ -999.250 CNTCoPS4 TENS.PS~ -999.250 CCLoPS4 END OF OATA ~ ttt~ FILE FILE NA#E SERVICE VERSION DATE MAX REC SIZE FILE TYPE LAST FILE TRAILER ~*~* : EDIT .001 : FLIC : 001A04 : 90/05/29 : 1024 : LO : 29-HAY-1990 13:12 26.270 NPHZ.PS1 769°539 CNTC.PS1 1245.000 CCL.PS1 3907.908 RCFToPS2 32.656 TEMS. PS2 5.074 RCNT.PS3 797.037 GR.PS3 26.026 TNRA. PS4 3942.793 CFTCoPS4 0.000 42.920 NPHIoPS1 400.400 CNTC. PS1 12100000 CCL. PS1 2466.466 RCFT.PS2 67.625 TENS.PS2 6.624 RCNT. PS3 386.064 GR. PS3 ~40029 TNRA.PS4 2523.792 CFTC.PS4 0.000 0.000 NPHZ. PS1 -999.250 CNTC.PS1 -999.250 CCLoPS1 -999.250 RCFT.PS2 -999.250 TENS.PS2 -999.250 RC~tT.PS3 -999.250 GR.PS3 -999.250 TNRAoPS4 -999.250 CFTC.PS4 -999.250 27.875 3996.444 0o000 865.731 1255.000 3897.839 35.688 5.035 792.069 43°865 2554°784 0-000 368.737 12100000 2468.660 62.344 6.796 375.771 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999o250 -999.250 TNRA.PS1 CFTC.PS1 NPHZ.PS2 CNTC.PS2 CCL.PS2 RCFToPS3 TENS. PS3 RCNToPS~ GR.PS4 TNRA. PS1 CFTC.PS1 NPHIoPS2 CNTC.PSZ CCL. PS2 RCFToPS3 TENS.PS3 RCNT.PS4 GR.PS4 TNRA.PS1 CFTC.PS1 NPHI. PS2 CNTCoPS2 CCLoPS2 RCFT.PS3 TENS.PS3 RC#T.PS~ GR.PS& PAGE: 5.252 775.785 25.102 4039.329 0.000 848.602 1235.000 3775.811 340313 6.781 374o629 41.953 2561.447 0.000 3540870 1245o000 23570563 62.344 -999.250 -999.250 -999.250 -999.250 -999.250 -999o250 -999.250 -999.250 -999.250 LIS TAPE VERIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER 29--MAY-1990 13:12 PAGE: ~ TAPE TRAILER ~ SERVICE NAHE : EDIT DATE : 90/05/Z9 ORIGIN : FLIC TAPE NAME : 73871 CONTINUATION t : 1 PREVIOUS TAPE : COMMENT :BPt PRUDHOE BaT, d-13 ¢22-03-11-13), API #S0-029-20497 · *~ REEL TRAILER SERVICE NAME : EDIT DATE : 90/05/29 ORIGIN : FLIC REEL NAME : 73871 CONTINUATION ~ : PREVIOUS REEL COMMENT : BP, PRUDHDE BAYt J-13 C22-03-11-13)~ API #50-029-20497 J- 13 ~ ~ PRUDHOE B/~Y %~ ~'~ ~ /'\ /\ WESTERN ATLAS Atlas Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING J- 13 (22-03-11-13) 500292049700 BP EXPLORATION (ALASKA) ATLAS WIRELINE SERVICES 08-JUL-94 1187.02 L. KOENN R. MAYS INC. 9 liN 13E 650 804 69.07 64.00 37.70 OPEN HOLE BIT SIZE (IN) CASING SIZE (IN) 9.625 7.000 7.000 4.500 DRILLERS DEPTH (FT) 10780.0 11795.0 10226.0 10333.0 CASING WEIGHT 47.00 29.00 26.00 12.60 (LB/FT) CURVE SHIFT DATA - ALL PASSES TO STANDARD BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 07-SEP-80 SWS BASELINE DEPTH 10867.5 10868.5 10869.0 10887.0 10887.5 10919.0 10920.0 10932.0 10944.0 10949.0 10956.5 10961.5 GRCH 10866.0 10867.0 10868.0 10886.0 10887.0 10918.5 10919.0 10931.0 10943.5 10948.5 10955.5 10960.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 10975.0 10985.0 10986.0 10987.0 10987.5 10989.0 10990.0 10990.5 10991.0 10992.5 10993.5 11003.0 11004.0 11007.5 11008.0 11009.5 11012.5 11031.0 11038.5 11039.5 11048.5 11049.0 11067.0 11068.5 11069.5 11078.0 11121.5 11127.0 11128.0 11142.0 11351.5 11359.0 11364.0 11371.5 11372.0 $ REMARKS: 10974.5 10984.5 10985.0 10986.0 10987.0 10988.5 10989.0 10989.5 10990.5 10992.0 10992.5 11002.0 11003.5 11007.0 11008.0 11009.5 11011.5 11030.0 11040.0 11041.0 11049.0 11050.0 11067.0 11068.5 11069.0 11077.5 11119.5 11125.0 11125.5 11139.5 11351.5 11359.0 11363.5 11371.0 11371.5 CN/GR Cased Hole. LOG TIED TO SONIC DATED 28-SEP-80. CN LOGGING PARMS: LIMESTONE MATRIX CHISM OFF CALIPER CORRECTION = 10.625 CASING CORRECTIONS OFF SALINITY = 0 PPM SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A . OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH 10830.0 10842.0 BASELINE DEPTH NPHI 10825.0 10825.0 10866.0 10865.5 10874.0 10873.0 10926.0 10924.5 10945.0 10944.5 10949.5 10949.0 10985.5 10987.5 10986.5 10988.5 10987.5 10989.0 10988.5 10989.5 10990.0 10991.0 11008.5 11009.0 11012.0 11011.0 11014.5 11013.5 11015.0 11014.5 11016.5 11016.0 11030.0 11027.5 11047.5 11046.0 11048.5 11047.0 11067.5 11067.0 11068.0 11067.5 11071.5 11070.5 11078.0 11077.0 11130.5 11128.0 11133.5 11131.0 11134.5 11131.5 11135.5 11132.5 11351.5 11351.5 11359.0 11359.0 11364.0 11363.5 11371.5 11371.0 11372.0 11371.5 $ STOP DEPTH 11439.0 11447.0 (MEASURED DEPTH) REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. in separate files. / ? ?MATCH lB. OUT $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 31 Tape File Start Depth = 11457.000000 Tape File End Depth = 10825.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7591 datums Tape Subfile: 2 214 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 10837.5 10847.0 10861.5 10867.5 10867.0 10876.0 10877.0 10884.5 10885.0 10884.5 10885.5 10885.5 10886.0 10886.5 10886.5 10887.0 10887.5 10887.5 10888.5 10888.5 10889.0 10889.5 10889.5 10890.0 10896.0 10910.5 10918.0 10918.0 10919.0 10918.5 10919.5 10919.5 10920.0 10920.0 10921.0 10920.5 10931.5 10932.0 10931.5 10933.5 10934.5 10935.0 10936.0 10936.0 10936.5 10937.0 10937.5 10942.5 10943.5 10943.0 10944.0 10943.5 10944.5 10944.5 10949.5 10955.5 10958.5 10964.0 10967.0 START DEPTH STOP DEPTH 10833.0 11439.0 10845.0 11447.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10840.0 10849.5 10861.5 10876.0 10876.5 10884.0 10884.5 10896.0 10910.0 10921.0 10930.5 10942.5 10949.5 10956.0 10960.0 10965.5 10968.5 10968.0 10969.0 10969.5 10980.5 10986.5 10987.0 10987.5 10988.0 10989.5 10994.0 10996.5 10997.0 10997.5 10998.5 11003.0 11003.5 11004.0 11008.5 11010.5 11011.0 11012.0 11013.0 11014.0 11023.0 11024.0 11025.5 11026.5 11027.5 11029.0 11029.5 11030.0 11031.0 11032.0 11034.5 11035.0 11040.5 11042.5 11048.0 11055.5 11059.5 11067.0 11068.0 11072.5 11078.0 11079.0 11080.0 11080.5 11083.0 11084.0 11084.5 11086.0 11087.0 11088.0 11089.0 11090.0 11091.5 11092.5 11116.0 11117.0 11117.5 10986.5 10987.0 11002.5 11003.5 11010.5 11011.5 11030.5 11036.0 11041.5 11056.0 11067.5 11068.0 11078.0 10969.0 10970.0 10971.0 10983.0 10989.5 10990.0 10991.5 10995.5 10998.0 10999.0 10999.5 11000.0 11004.5 11005.0 11009.5 11011.5 11012.5 11013.0 11013.5 11022.5 11023.0 11024.5 11025.0 11026.0 11026.5 11027.0 11028.0 11030.0 11033.5 11041.5 11047.5 11059.0 11071.5 11078.0 11080.0 11080.5 11082.5 11083.5 11084.5 11086.0 11086.5 11087.5 11088.0 11088.5 11090.0 11090.5 11113.5 11114.5 11115.5 11120.0 11120.5 11121.5 11134.5 11135.5 11138.0 11138.5 11139.5 11140.0 11140.5 11141.0 11141.5 11146.5 11169.0 11178.0 11179.5 11180.5 11183.5 11198.0 11207.0 11208.0 11236.5 11257.0 11258.5 11259.0 11259.5 11260.0 11269.0 11282.0 11284.0 11287.5 11288.0 11289.0 11289.5 11290.5 11291.0 11292.5 11293.5 11294.5 11301.5 11307.5 11312.5 11316.5 11329.0 11333.0 11338.5 11341.0 11341.5 11342.0 11343.0 11345.0 11351.0 11352.0 11372.5 11376.0 11376.5 11397.5 11398.0 11420.0 11420.5 11118.5 11119.0 11119.5 11136.0 11138.0 11138.5 11139.5 11196.5 11206.5 11313.5 11317.5 11329.5 11351.5 11352.0 11372.5 11375.0 11375.5 11397.0 11397.5 11420.0 11420.5 11132.5 11133.0 11136.0 11136.5 11137.5 11144.0 11167.0 11176.0 11177.0 11177.5 11181.5 11205.0 11235.5 11256.0 11258.0 11258.5 11259.0 11259.5 11268.5 11281.0 11283.0 11288.5 11289.0 11289.5 11290.0 11290.5 11291.5 11293.0 11293.5 11294.5 11303.0 11307.0 11333.0 11338.0 11340.5 11341.5 11342.0 11342.5 11344.5 11421.0 11428.0 11428.5 11429.0 11431.0 11433.5 11441.5 11442.5 11443.0 11445.0 11445.5 $ REMARKS: 11421.5 11428.5 11429.0 11429.5 11431.5 11433.5 11442.5 11443.0 11441.5 11445.0 11445.5 PASS 2. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH2A. OUT / ??MATCH2B. OUT $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 31 Tape File Start Depth = 11457.000000 Tape File End Depth = 10825.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7591 datums Tape Subfile: 3 233 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH 10833.0 10845.0 BASELINE DEPTH GRCH 10837.5 10847.0 10855.0 10854.5 10861.0 10872.0 10872.5 10873.5 10874.5 10888.5 10888.0 10892.5 10918.5 10917.5 10919.0 10918.0 10920.0 10919.5 10925.5 10926.0 10926.5 10930.0 10930.5 10931.0 10932.5 10932.0 10941.5 10943.0 10943.0 10948.0 10948.5 10953.5 10956.0 10957.0 10979.5 10980.0 10987.0 10987.0 10988.0 10987.5 10989.5 10991.5 10991.0 10992.0 10993.0 10992.0 11000.5 11000.5 11008.0 11008.0 STOP DEPTH 11439.0 11447.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10840.0 10849.5 10861.0 10872.0 10873.0 10874.0 10874.5 10892.5 10924.0 10924.5 10925.5 10929.0 10930.0 10930.5 10941.5 10948.0 10949.0 10954.0 10957.0 10958.0 10981.0 10982.0 10991.5 10993.5 10994.0 11008.5 11010.0 11010.5 11011.0 11012.0 11013.0 11014.0 11015.0 11024.0 11025.0 11027.0 11028.0 11029.5 11032.0 11037.5 11039.0 11039.5 11040.0 11040.5 11047.5 11052.0 11053.0 11054.0 11058.5 11064.5 11066.5 11070.5 11076.5 11077.0 11078.5 11082.5 11084.5 11085.5 11088.0 11089.0 11117.0 11118.0 11118.5 11125.0 11126.5 11127.5 11133.0 11136.5 11137.0 11137.5 11141.0 11144.0 11146.0 11147.0 11150.5 11156.5 11157.0 11160.5 11161.5 11162.5 11166.0 11170.5 11171.5 11172.0 11178.0 11009.0 11010.5 11011.0 11013.0 11013.5 11031.5 11040.0 11041.0 11066.5 11078.5 11123.5 11125.0 11125.5 11134.5 11135.5 11136.0 11138.5 11141.5 11148.5 11155.5 11156.0 11160.0 11009.5 11011.0 11012.5 11013.0 11014.0 11014.5 11023.5 11024.0 11026.0 11026.5 11027.5 11035.5 11038.0 11039.0 11047.5 11052.0 11052.5 11053.5 11058.5 11064.5 11070.0 11076.0 11077.0 11078.5 11083.0 11085.0 11085.5 11088.0 11088.5 11116.5 11117.0 11117.5 11130.5 11143.5 11144.0 11158.5 11160.5 11164.5 11169.0 11169.5 11170.5 11176.5 11178.5 11179.5 11184.5 11187.5 11206.0 11207.0 11237.0 11237.5 11254.5 11255.0 11256.0 11257.5 11266.5 11284.0 11284.5 11316.0 11340.5 11341.0 11341.5 11343.5 11344.0 11351.0 11351.5 11352.5 11354.5 11355.0 11356.0 11357.0 11357.5 11365.5 11372.5 11415.5 11416.0 11418.0 11430.5 11433.5 11441.5 11442.5 11443.0 11445.0 11445.5 $ REMARKS: 11282.5 11318.0 11352.0 11352.5 11353.0 11355.0 11356.0 11357.0 11357.5 11358.0 11365.5 11372.5 11417.5 11418.0 11418.5 11431.0 11433.5 11442.5 11443.0 PASS 3. FUCT, NUCT, 11177.5 11178.5 11182.0 11185.0 11204.0 11205.0 11237.0 11237.5 11254.0 11254.5 11255.0 11256.5 11266.0 11283.5 11284.5 11340.5 11341.0 11341.5 11343.5 11344.5 11441.5 11445.0 11445.5 & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH3A . OUT / ??MATCH3B. OUT $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 31 Tape File Start Depth = 11457.000000 Tape File End Depth = 10825.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15182 datums Tape Subfile: 4 203 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-L 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 26 Tape File Start Depth = 11457.000000 Tape File End Depth = 10825.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13917 datums Tape Subfile: 5 49 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10825.0 2418 10837.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11441.5 11450.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 23-JUN-94 FSYS REV. J001 VER. 1.1 1708 23-JUN-94 11650.0 11453.0 10850.0 11450.0 900.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323NA 0.000 11795.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 1. $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-L 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 101 Tape File Start Depth = 11450.000000 Tape File End Depth = 10825.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 40193 datums Tape Subfile: 6 Minimum record length: Maximum record length: 176 records... 46 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10832.0 2418 10840.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11441.5 11450.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 23-JUN-94 FSYS REV. J001 VER. 1.1 1752 23-JUN-94 11650.0 11453.0 10850.0 11450.0 900.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323NA 0.000 11795.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 2. $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-L 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 99 Tape File Start Depth = 11450.000000 Tape File End Depth = 10832.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 38648 datums Tape Subfile: 7 Minimum record length: Maximum record length: 174 records... 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10832.0 2418 10840.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM GR CN CCL $ PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON CASING COLLAR LOC. BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): STOP DEPTH 11441.5 11450.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 23-JUN-94 FSYS REV. JO01 VER. 1.1 1837 23-JUN-94 11650.0 11453.0 10850.0 11450.0 900.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323NA 0.O00 11795.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 3. $ CN : BP EXPLORATION WN : J - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-L 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# O) 1006 BYTES * Total Data Records: 99 Tape File Start Depth = 11450.000000 Tape File End Depth = 10832.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 64924 datums Tape Subfile: 8 Minimum record length: Maximum record length: 174 records... 62 bytes 1006 bytes Tape Subfile 9 is type: LIS 01 **** REEL TRAILER **** 94/ 7/11 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 11 JLY 94 11:32a Elapsed execution time = 7.64 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... RECEIVED JUL ~ 1%99B Alaska Oil & Gas Cons. Commission Anchorage COMPANY NAME : BP EXPLORATION WELL NAME : J- 13 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292049700 REFERENCE NO : 98371 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: **** REEL HEADER **** SERVICE NA~E : EDIT DATE : 98/07/21 ORIGIN : FLIC REEL NAME : 98371 CONTINUATION # : PREVIOUS REEL : COM~fEN~f · BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/07/21 ORIGIN : FLIC TAPE NAME : 98371 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: J-13 API NUMBER: 500292049700 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 21-JUL-98 JOB NUMBER: 98371 LOGGING ENGINEER: J. SPENCER OPERATOR WITNESS: M. KISSINGER SURFACE LOCATION SECTI ON: 9 TOWNSHIP: 1 iN RANGE: 13E FNL: 650 FSL. FEL: 804 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 69.10 DERRICK FLOOR: GROUND LEVEL: 37.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) .............................................. 1ST STRING 8. 500 7. 000 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN ArGMBF~ : PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH .............. 88888.0 11318.5 11292.0 11267.0 11231.0 11201.5 11190.5 11177.0 11172.5 11172.0 11148.5 11144.0 11136.0 11128.5 11125.5 11123.5 11116.0 11073.0 11071.5 11069.0 11053.0 11036.0 11035 5 11025 0 11020 5 11017 5 11003 5 10995 0 10981.5 10977.0 10975.0 10966.0 10960.5 10957.5 10943.0 10925.5 10924.0 10880.5 10875.5 10873.0 1O855.0 10832.5 10813.0 100.0 $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.5 88889.5 11320.0 11320.0 11292.0 11292.0 11266.0 11266.0 11233.0 11233.0 11203.5 11203.5 11193.0 11193.0 11179.5 11175.5 11175.5 11151.5 11151.5 11146.0 11146.0 11137.5 11137.5 11131.0 11131.0 11128.0 11128.0 11126.0 11126.0 11116.5 11116.5 11073.0 11069.0 11053.0 11035.0 11026.0 11022.0 11018.5 11004.0 10996.0 10982.5 10978.0 10975.0 10967.0 10962.0 10958.5 10944.0 10926.5 10881.5 10877.0 10874.5 10855.0 10834.0 10815.0 102.0 11073.0 11069.0 11053.0 11035.0 11026.0 11022.0 11018.5 11004.0 10996.0 10982.5 10978.0 10975.0 10967.0 10962.0 10958.5 10944.0 10926.5 10881.5 10877.0 10874.5 10855.0 10834.0 10815.0 102.0 PAGE: LIS Tape Verification L~st~ng Schlumberger Alaska Computlng Center 24-JUL-1998 15:13 CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION WELL J-13 ON 8-APR-98. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CNTD PASS #1 GRCH TO THE BASELINE GAM~A RAY PROVIDED BY THE CLIENT (GR.BCS) ; AND CNTD PASS #1 NPHI TO GR.BCS. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE · 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth sh~fted and cl~pped curves for each pass ~n separate f~les. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 11323.0 10808.0 CNTD 11347.0 10808.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. REF~%RKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX) DEPT FT 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1187892 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11348. 500 NPHI. CNTD 32. 389 NRAT. CNTD 5. 019 CRAT. CNTD NCNT. CNTD 3160. 896 FCNT. CNTD 629. 726 CFTC. CNTD 622. 905 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1662. 000 CCL. CNTD O . 000 DEPT. 10810.000 NPHI. CNTD 46.221 NRAT CNTD 5.903 CRAT. CNTD NCNT. CNTD 1890.836 FCNT. CNTD 320.320 CFTC. CNTD 316.851 CNTC. CNTD GRCH. CNTD 60.037 TENS. CNTD 1543.000 CCL.CNTD 0.000 5.330 3331.432 6. 891 1968. 948 LIS Tape Verification Llst~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth sh~fted and cl~pped curves for each pass ~n separate f~les. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 11323 0 10754.0 CNTD 11347.0 10754.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH CNTD ............................ 88888.0 88889.5 88890.0 11333.0 11335.0 11324 0 11326.0 11318.5 11320.0 11315.5 11316.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 11309.0 11311.0 11302.0 11302.0 11279.5 11280.5 11266.5 11265.5 11259.5 11259.0 11260.0 11259.0 11246.0 11247.5 11242.0 11242.0 11235.0 11236.5 11234.0 11236.0 11231.0 11233.0 11220.5 11223.5 11218.5 11220.5 11210.5 11213.0 11203.0 11205.5 11201.0 11203.5 11193.5 11196.0 11183.5 11187.0 11172.0 11175.5 11171.0 11174.5 11159.5 11163.5 11150.5 11153.5 11145.5 11148.5 11143.5 11146.0 11135.5 11138.0 11132.5 11134.5 11128.5 11132.0 11128.0 11132.0 11123.5 11125.5 11116.0 11116.5 11072.5 11073.0 11071.5 11073.0 11065.5 11065.5 11060.0 11060.0 11048.5 11048.5 11036.0 11035.0 11035.0 11035.0 11025.0 11026.0 11017.5 11019.0 11006.0 11006.5 11005.5 11006.5 11003.5 11004.5 10996.5 10997.5 10992.0 10993.0 10990.5 10992.5 10985.0 10986.0 10982.0 10983.0 10976.5 10978.0 10975.0 10975.5 10969.0 10969.0 10968.5 10969.5 10962.5 10964.5 10961.5 10962.0 10957.5 10958.5 10957.0 10957.0 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 10949.0 10950.5 10943.0 10944.5 10942.0 10943.0 10933.0 10934.0 10925.5 10926.5 10923.5 10927.0 10919.5 10921.0 10901.0 10901.5 10888.0 10889.0 10882.0 10883.5 10880.5 10881.5 10873.0 10874.5 10869.5 10871.0 10866.0 10866.0 10862.0 10863.0 10859.0 10859.0 10853.0 10853.0 10846.5 10847.0 10832.0 10834.5 10829.5 10830.0 10818.0 10819.5 100.0 101.5 100.5 $ REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CNTD PASS #2 GRCH TO CNTD PASS #1 GRCH; AND CNTD PASS #2 NPHI TO CNTD PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE. TYPE REPR CODE VALUE .............................. 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 FCNTCNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1187892 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 11349.000 NPHI.CNTD 28.751 NRAT. CNTD 4.759 CRAT CNTD NCNT. CNTD 3049.197 FCNT. CNTD 640.674 CFTC. CNTD 633.735 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1645.000 CCL.CNTD 0.000 DEPT. 10754.500 NPHI.CNTD 50.750 NRAT. CNTD 6.752 CRAT. CNTD NCNT. CNTD 1854.584 FCNT. CNTD 274.678 CFTC. CNTD 271.703 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1552.000 CCL.CNTD 0.000 4.892 3292 834 7.410 2036. 966 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: **** FILE HEADER **** FILE NAFIE : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11323.0 10802.0 CNTD 11347.0 10802.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 11338.5 11325.5 11318.5 11313.0 11308.0 11301.5 11292.5 11278.5 11260.0 11251.0 11239.5 11235.5 11230.0 11221.0 11210.5 11203.0 11201.5 11193.5 11190.5 11187.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. 88889.5 88889.0 11339.5 11326.5 11320.0 11292.0 11203.5 11193.0 11313.5 11308.0 11302.0 11279.5 11260.0 11251.5 11241.0 11236.5 11233.0 11223.0 11213.0 11206.0 11196 0 11194.0 11190.0 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 10 11172.5 11175.5 11171.5 11175.0 11149.0 11151.5 11145.5 11148.5 11143.5 11146.0 11133.5 11136.0 11129.0 11131.5 11128.0 11131.5 11125.0 11128.0 11122.5 11125.0 11116.0 11116.5 11114.5 11115.5 11092.0 11093.5 11078.5 11080.5 11073.0 11073.0 11071.5 11073.0 11060.0 11060.0 11041.5 11042.0 11036.0 11035.0 11035.5 11035.0 11025.0 11026.0 11018.0 11019.5 11006.0 11006.5 10996.5 10997.5 10992.0 10993 0 10985.0 10986.0 10983.0 10984.0 10982.0 10983.0 10976.0 10978.0 10974.5 10975.0 10968.5 10969.5 10961.0 10962.5 10953.0 10953.5 10949.0 10950.0 10943.5 10944.5 10933.0 10934.5 10925.5 10926.5 10924.5 10927.0 10897.5 10901.0 10888.0 10889.0 10882.0 10883.5 10880.5 10882.0 10875.5 10877.0 10873.5 10874.5 10870.0 10871.5 10861.5 10863.0 10856.0 10855.0 10852.0 10853.0 10838.0 10840.0 10833.0 10834.5 10830.0 10830.5 10829.5 10832.0 10817.5 10820.0 10816.0 10817.5 100.0 101.5 100.5 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 11 REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CNTD PASS #3 GRCH TO CNTD PASS #1GRCH; AND CNTD PASS #3 NPHI TO CNTD PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1187892 O0 000 O0 0 3 I 1 4 68 0000000000 NRAT CNTD 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1187892 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 12 ** DATA ** DEPT. 11348.000 NPHI.CNTD 30.471 NRAT. CNTD 4.856 CRAT. CNTD NCNT. CNTD 3193.133 FCNT. CNTD 657.534 CFTC. CNTD 650.412 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1633.000 CCL. CNTD 0.000 DEPT. 10802.500 NPHI. CNTD 44.529 NRAT. CNTD 5.797 CRAT. CNTD NCNT. CNTD 1990.349 FCNT. CNTD 343.348 CFTC. CNTD 339.629 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1527.000 CCL.CNTD 0.000 5.101 3359. 677 6. 698 2073.199 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCR~ENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... CNTD 1, 2, 3, $ REMARKS: THE ARITHPIETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS Tape Verification Llst~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 13 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 FCNTCNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1187892 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11348.500 NPHI.CNAV -999.250 NRAT. CNAV -999 250 CRAT. CNAV NCNT. CNAV -999.250 FCNToCNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD -999.250 TENS.CNTD 1662.000 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 14 DEPT. 1081 O. 000 NPHI. CNAV 45. 672 NRAT. CNAV NCNT. CNAV 1912. 269 FCNT. CNAV 316. 623 CFTC. CNAV GRCH. CNTD 60. 037 TENS. CNTD 1543. 000 6. 040 CRAT. CNAV 313.193 CNTC. CNAV 6. 828 2023. 602 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last f~le PASS NUMBER: 1 DEPTH INCR~ENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH CNTD 11360.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH .......... 10807.5 08-APR-98 8C0-609 1626 08-APR-98 11655.0 0.0 10750.0 11351.0 1800.0 NO LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15.13 PAGE: 15 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAM~A RAY CNTD COMP. NEUTRON $ TOOL NUMBER ........... CGRS-A CNT- D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN). DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 11795.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REF~ARKS: TIED INTO SWS BHCS DATED 9/28/80. LOGGED ON SANDSTONE MATRIX. DID NOT TAG TD. SHUT IN WHP = 1900 PSI WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING. FIELD PICK GOC @ 11293' FID. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 16 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) O0 000 O0 0 5 1 1 4 68 0000000000 DEPT FT 1187892 NPHI PS1 PU 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 RCNTPS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1187892 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11360.000 NPHI.PS1 23.640 RTNR.PS1 4.000 TNRA.PS1 RCNT. PS1 4129.032 RCFT. PS1 1032.258 CNTC. PS1 4329.853 CFTC. PSI GR.PS1 0.000 TENS.PSI 834.000 CCL.PS1 0.010 DEPT. 10807.000 NPHI.PS1 44.898 RTNR.PS1 6.235 TNRA.PS1 RCNT. PS1 1827.671 RCFT. PS1 293.130 CNTC. PS1 1968.948 CFTC. PSI GR.PS1 62.784 TENS.PSi 1535.000 CCL.PS1 -999.250 4.240 1021.077 6.740 289.955 LIS Tape Verification Listing Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 17 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass ~n separate f~les; raw background pass in last file PASS NUMBER: 2 DEPTH INCR~ENT: 0.5000 FILE SO?4FzARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11362.0 10752.0 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... 08-APR-98 8C0-609 1626 08-APR-98 11655.0 0.0 10750.0 11351.0 1800.0 NO TOOL NUMBER ........... LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 18 GR GAMMA RAY CNTD COMP. NEUTRON $ CGRS-A CNT- D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 8.500 11795.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) · 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): RE~RKS: TIED INTO SWS BHCS DATED 9/28/80. LOGGED ON SANDSTONE MATRIX. DID NOT TAG TD. SHUT IN WHP = 1900 PSI WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING. FIELD PICK GOC @ 11293' MD. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 19 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ....................................................................................... DEPT FT 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1187892 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11362.000 NPHI.PS2 23.640 RTNR.PS2 4.000 TNRA.PS2 RCNT. PS2 3764.706 RCFT. PS2 941.177 CNTC. PS2 3947.806 CFTC. PS2 GR.PS2 0.000 TENS. PS2 779.000 CCL. PS2 -0.019 DEPT. 10751.500 NPHI.PS2 48.195 RTNR.PS2 7.054 TNRA.PS2 RCNT. PS2 2021.750 RCFT. PS2 286.617 CNTC. PS2 2128.278 CFTC. PS2 GR.PS2 49.675 TENS. PS2 1468.000 CCL.PS2 -999.250 4.240 930. 982 7.117 283.513 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE. 20 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER 7 RAW CURVES Curves and log header data for each pass ~n separate f~les; raw background pass ~n last f~le PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SU~FiARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 11362.5 10801 . 0 CNTD LOG HEADER DATA DATE LOGGED: 08-APR-98 SOFTWARE VERSION: 8C0- 609 TIME LOGGER ON BOTTOM: 1626 08-APR-98 TD DRILLER (FT) : 11655.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT): 10750.0 BOTTOM LOG INTERVAL (FT) : 11351.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... TOOL NUMBER ........... LIS Tape Verlf~catxon L~st~ng Schlumberger Alaska Computlng Center 24-JUL-1998 15:13 PAGE: 21 GR GAMMA RAY CNTD COMP. ITEUTRON $ CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) . DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 8.500 11795.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) .. SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: TIED INTO SWS BHCS DATED 9/28/80. LOGGED ON SANDSTONE MATRIX. DID NOT TAG TD. SHUT IN WHP = 1900 PSI WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING. FIELD PICK GOC ® 11293' FID. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification L~st~ng Schlumberger Alaska Computlng Center 24-JUL-1998 15:13 PAGE: 22 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ....................................................................................... DEPT FT 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1187892 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11362.500 NPHI.PS3 67259.000 RTNR.PS3 -999.250 TNRA.PS3 RCNT. PS3 3878.788 RCFT. PS3 0.000 CNTC. PS3 4067.437 CFTC. PS3 GR.PS3 0.000 TENS.PS3 821.000 CCL.PS3 0.010 DEPT. 10800.500 NPHI.PS3 45.487 RTNR.PS3 6.558 TNRA.PS3 RCNT. PS3 1990.349 RCFT. PS3 303.477 CNTC. PS3 2066.002 CFTC. PS3 GR.PS3 68.267 TENS.PS3 1484.000 CCL.PS3 -999.250 -1059.323 0.000 6.807 300.190 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 24-JUL-1998 15:13 PAGE: 23 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE . 98/07/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/07/21 ORIGIN : FLIC TAPE NAME : 98371 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/07/21 ORIGIN : FLIC REEL NAME : 98371 CONTINUATION # : PREVIOUS REEL : COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 * ALASKA COMPUTING CENTER * . ****************************** . ............................ . ....... SCHLUMBERGER ....... . ............................ . ****************************** RECEiVeu ]99 ' COMPANY NAME : BP EXPLORATION WELL NAME : J-13 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292049700 REFERENCE NO : 97195 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/05/20 ORIGIN · FLIC REEL NAblE : 97195 CONTINUATION # : PREVIOUS REEL : COI~4~NT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/05/20 ORIGIN FLIC TAPE NAME : 97195 CONTINUATION # 1 PREVIOUS TAPE : COM~IENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: J-13 API NUMBER. 500292049700 OPERATOR: BP EXPLORATION LOGGING COMPANY. SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 20-MAY-97 JOB NUMBER: 97195 LOGGING ENGINEER. S.DECKERT OPERATOR WITNESS: K. BARDWELL SURFACE LOCATION SECTION: 9 TOWNSHIP: lin RANGE: 13E FNL: 650 FSL: FEL: 804 FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: 65.00 DERRICK FLOOR: 64.00 GROUND LEVEL: 37.70 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) .............................................. 9.625 10780.0 47.00 7.000 10226.0 26.00 7.000 11795.0 29.00 4.500 10333.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15.56 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 7-SEPT-80 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH NPHI ............................ 88888.0 88889.5 88889.5 11411.5 11413.0 11413.0 11387.0 11388.0 11388.0 11366.0 11367.0 11367.0 11364.0 11365.5 11365.5 11360.5 11361.5 11361.5 11357.5 11359.0 11359.0 11356.0 11357.0 11357.0 11338.5 11340.0 11340.0 11317.0 11320.0 11320.0 11298.0 11301.0 11301.0 11262.0 11265.5 11265.5 11245.0 11248.5 11248.5 11228.5 11233.0 11233.0 11200.0 11203.0 11203.0 11189.5 11192.5 11192.5 11185.0 11189.0 11189.0 11175.0 11179.0 11179.0 11142.5 11146.0 11141.0 11146.0 11134.0 11137.0 11137.0 11127.0 11131.0 11131.0 11122.5 11126.0 11126.0 11101.5 11103.0 11103.0 11081.0 11082.5 11082.5 11071.5 11073.0 11073.0 11068 0 11069.0 11069.0 11052.0 11053.0 11053 0 11035.0 11035.0 11035.0 11023.5 11026.0 11026.0 11019 5 11022.0 11022.0 11016.0 11018.0 11018.0 11008.0 11010.0 11010.0 11002.5 11004.0 11004.0 10996.0 10998.0 10998.0 10994.0 10996.0 10996.0 10980.5 10982.5 10982.5 10976.5 10978.0 10978.0 10971.0 10972.5 10972.5 10967.0 10968.5 10968.5 10959.0 10962.0 10962.0 10956.0 10958.5 10958.5 10955.0 10956.5 10956.5 10944.0 10946.0 10946.0 10940.0 10942.0 10942.0 PAGE: LIS Tape VerlfIcatlon Listing Schlumberger Alaska Computing Center 20-MAY-1997 15.56 10937.0 10939.0 10939.0 10936.0 10936.0 10936.0 10929.0 10929.5 10929.5 10924.0 10926.0 10926.0 10902.0 10905.5 10905.5 10901.0 10904.0 10904.0 10886.0 10888.0 10888.0 10877.0 10879.0 10879.0 10874.0 10877.0 10871.5 10874 0 10874.0 10865.5 10866.5 10865.0 10866.5 10857.5 10858.0 10858.0 10855.0 10855.0 10855.0 10838.5 10840.5 10840.5 10832.0 10834.0 10834.0 10824.0 10826.5 10826.5 10816.5 10819.0 10819.0 10812.5 10815 0 10815.0 10808.0 10811.0 10811 . 0 100.0 103.0 103.0 $ REMARKS: CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION'S J-13 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #1 GRCH TO GR.BCS; AND PASS #1 NPHI TO GR BCS. ALL OHTER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE 97/05/20 MAX REC SIZE · 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth sh~fted and clipped curves for each pass in separate f~les. PASS NUMBER: 1 DEPTH INCRE~IENT: 0 5000 FILE SUMFIARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 11421.0 10795.0 CNTD 11445.0 10795.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. REMARKS: THIS FILE CONTAINS CNTD PASS #1. THERE WERE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 .............................. ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 488059 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-L 488059 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 488059 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 488059 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000 FCNTCNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELM CODE (HEX) CFTC CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 488059 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 488059 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 488059 O0 000 O0 0 1 1 1 4 68 0000000000 ....................................................................................... ** DATA ** DEPT. 11446.500 NPHI. CNTD 30.437 NRAT. CNTD 5.097 CRAT. CNTD NCNT. CNTD 3174.935 FCNT. CNTD 607.843 CFTC. CNTD 591.001 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1335.000 CCL.CNTD 0.000 DEPT. 10798.000 NPHI CNTD 41.381 NRAT. CNTD 6.375 CRAT. CNTD NCNT. CNTD 1958.429 FCNT. CNTD 301.531 CFTC. CNTD 314.746 CNTC. CNTD GRCH. CNTD 53.031 TENS. CNTD 1380.000 CCL.CNTD 0.000 5.546 3287.768 6.579 2016.154 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate f~les PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 LIS Tape Verlflcatlon L~st~ng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11421.0 10798.0 CNTD 11445.0 10798.0 $ CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH CNTD ............................ 88888.0 88889.5 88890.5 11440.5 11443.0 11437.0 11438.5 11418.0 11420.0 11409.5 11411.0 11409.0 11409.0 11402.5 11404.0 11401.0 11402.5 11385.5 11387.0 11384.5 11385.5 11371.5 11373.5 11366.5 11367.5 11366.0 11367.0 11360.5 11362.0 11356.0 11357 0 11355.5 11357.0 11352.0 11353.0 11349.0 11350.5 11346.0 11347.5 11337 5 11339.0 11323 0 11325.5 11316.5 11320.0 11309.0 11312.0 11305.5 11309.0 11301.5 11304.5 11298.5 11301.5 11296.5 11301.0 11292.5 11296.0 11279.0 11282.0 11270 0 11273.5 11258.0 11261.5 11245.0 11249.0 11229.5 11234.0 11215.0 11219.5 11210.0 11213.5 11202.0 11205.0 11200.0 11203.0 11182.5 11186.5 11178.0 11182.5 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15'56 PAGE. 11175.0 11178.5 11171.0 11175.5 11166.0 11170.0 11158.5 11163.5 11151.0 11156.0 11147.0 11152.5 11144.5 11149.0 11142.0 11146.0 11141.0 11146.0 11134.0 11137.5 11132.0 11135.5 11131.5 11135.0 11126.5 11131.0 11124.5 11128.5 11128.5 11123.0 11126.5 11122.5 11126.0 11118.0 11122.0 11115.5 11119.5 11110.5 11113 0 11109.0 11112.0 11105.5 11102.5 11094.5 11095.5 11072.0 11073.0 11071.5 11073.5 11068.0 11069.0 11065.5 11066 5 11059.5 11060.5 11052.5 11053.0 11035.5 11035.0 11034.5 11035.0 11023.5 11026.0 11024.0 11021.0 11019.5 11022.0 11017.0 11019.5 11016.0 11018.5 11005.0 11007.0 11002.5 11004.5 10996.5 10998.5 10996.0 10998.5 10993.5 10996.0 10991.0 10993.0 10989.0 10991.5 10983.5 10986.0 10982.0 10984.5 10980.5 10983.0 10976.0 10978 0 10973.0 10975.0 10971.0 10973.0 10968.0 10970 0 10967.0 10969.0 10966.5 10968.5 10964.0 10966.5 10962.0 10965.0 10960.0 10962.0 10955.5 10957 5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 10949.0 10951.0 10946.0 10948.0 10944.5 10946.5 10943.5 10946.0 10939.5 10942.5 10935.0 10936.0 10924.0 10926.0 10926.0 10919.0 10921.5 10918.0 10919.5 10907.5 10912.5 10905.0 10909.0 10903.5 10905.5 10899.0 10902.5 10895 0 10898.0 10894.0 10897.0 10889.0 10892.5 10886.0 10889.0 10881.5 10883.5 10876.0 10878.5 10872.0 10874.5 10870.0 10872.5 10864.5 10866.0 10866.0 10862.0 10863.5 10861.5 10863.0 10859.0 10859.5 10856.0 10858.0 10856.5 10854.5 10855.0 10838.5 10840.5 10840.5 10831.5 10834.0 10831.0 10834.0 10822.5 10824.5 10815.5 10818.0 10813.0 10816.5 10808.0 10813.5 10804.0 10807.5 100.0 102.5 103.5 $ REM_ARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1GRCH; AND PASS #2 NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 488059 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-L 488059 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 488059 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 488059 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 488059 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 488059 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 488059 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 11447.500 NPHI.CNTD 26 240 NRAT. CNTD 4.703 CRAT CNTD NCNT. CNTD 3214.780 FCNT. CNTD 671.202 CFTC. CNTD 663.426 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1330 000 CCL.CNTD 0.000 DEPT 10800 500 NPHI.CNTD -999 250 NRAT. CNTD -999 250 CRAT CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC CNTD GRCH. CNTD 57.313 TENS. CNTD -999.250 CCL.CNTD -999.250 5.060 3376.146 -999.250 -999.250 LIS Tape Verification L~Stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 10 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 3 EDITED CURVES Depth sh~fted and cl~pped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11421.0 10798.0 CNTD 11445.0 10798.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH CNTD ............................ 88888.0 88887.5 88890.5 11440.5 11443.0 11433.5 11434.0 11430.0 11430.0 11427.0 11429.0 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15.56 PAGE: 11 11418.5 11414.5 11413.0 11410.5 11409.0 11403.0 11395.0 11390.0 11386 5 11385 0 11383 5 11377 0 11370 5 11367 0 11366.0 11365.5 11363.0 11361.0 11357.0 11356.0 11346.5 11338.0 11334.5 11325.5 11324 5 11317.0 11309.5 11307.0 11306.0 11298.5 11296.0 11293.5 11258.5 11245.5 11244.5 11237.5 11234.0 11229.5 11225.0 11219.0 11218.5 11215.5 11210.5 11210.0 11207.5 11202.5 11200.5 11196.5 11189.5 11186.0 11177.0 11167.0 11159.0 11150.5 11143.0 11418.0 11411.5 11403.5 11391.0 11385.5 11378.0 11367.0 11362.0 11357.5 11337.0 11327.5 11320.0 11309.0 11297.5 11261.5 11247.5 11239.5 11233.0 11229.0 11221.0 11213.5 11211.5 11203.0 11192.5 11179.5 11156.0 11146.0 11416.0 11414.0 11409.0 11396.0 11386.5 11384.0 11372.0 11367.5 11366.0 11364.0 11357.0 11347.5 11339.5 11325.5 11312.0 11310.0 11301.5 11296.0 11261.5 11249.0 11238.0 11221.0 11219.0 11213.5 11205.0 11199.0 11190.0 11180.5 11171.0 11163.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 12 11141.5 11139.5 11138.5 11134.0 11132.0 11125.0 11123.0 11115.0 11110.5 11110.0 11106.5 11104.5 11102.0 11083.0 11081.5 11072.0 11069.0 11068.5 11060.0 11057.5 11052.5 11052.0 11035.5 11035.0 11024.0 11022.5 11020.0 11017.5 11017.0 11013.5 11005.5 11003.0 10997.0 10996.5 10995.5 10993.5 10991.5 10989.0 10984.5 10981.0 10976.5 10973.5 10972.0 10970.0 10967.5 10962.0 10957.0 10956.5 10952 5 10949 5 10945 5 10942 5 10942 0 10939 5 10939.0 11137.0 11126.5 11103.5 11082.5 11073.0 11069.0 11053.0 11035.0 11026.0 11022.0 11018.5 11004.5 10998.5 10997.5 10996.0 10991.0 10983.0 10978.0 10973.5 10958.5 10944.0 10941.5 11146.0 11144.0 11143.0 11135.0 11128.5 11126.0 11116.0 11113.0 11111.5 11107.5 11105.5 11083.5 11073.5 11069.5 11061.0 11058.0 11052.5 11035.5 11024.5 11022.5 11019.5 11015.0 11007.0 10998.5 10993 5 10986 5 10975 0 10971.0 10968.5 10965.0 10957.5 10954.0 10950.5 10947.5 10944.5 10941.5 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 10935.5 10924.5 10918.0 10909.5 10909.0 10902.5 10899.5 10891 0 10889 0 10882 0 10879 5 10878 0 10875 0 10872 0 10870 5 10865 0 10864.5 10862.0 10859.0 10857.0 10853.0 10852.5 10848.5 10845.5 10839.0 10838.5 10831.0 10830.5 10825.5 10821.5 10817.5 10816.0 10812.0 10804.0 10802.5 10799.0 100.0 $ 10936.0 10926.0 10919.5 10910.5 10906.0 10902.5 10891.0 10881.5 10880.0 10877.0 10874.5 10866.5 10863 5 10855.0 10840 5 10834.0 10826.5 10818.5 10815.0 10807 0 104.5 10926.5 10912.0 10892.5 10883.5 10872.5 10866.0 10859.5 10856.5 10853.5 10849.5 10845.0 10840.5 10832.5 10828.5 10821.5 10808.5 10804.0 105.0 REM_ARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3 NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA PAGE: 13 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 .............................. ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) ....................................................................................... DEPT FT 488059 O0 000 O0 0 3 1 I 4 68 0000000000 NPHI CNTD PU-L 488059 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 488059 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 488059 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 488059 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 488059 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 488059 O0 000 O0 0 3 1 1 4 68 0000000000 14 ** DATA ** DEPT. 11447. 500 NPHI CNTD 28. 419 NRAT. CNTD 5. 077 CRAT. CNTD NCNT. CNTD 3150.259 FCNT. CNTD 646. 632 CFTC. CNTD 635. 748 CNTC. CNTD GRCH. CNTD - 999. 250 TENS. CNTD 1505. 000 CCL. CNTD O . 000 DEPT. 10802.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH CNTD 55.406 TENS CNTD -999 250 CCL.CNTD -999.250 5.315 3406.595 -999 250 -999.250 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 15 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, 3, CNTD REMARKS: THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 16 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 488059 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-L 488059 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 488059 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 488059 O0 000 O0 0 4 1 1 4 68 0000000000 NCNTCNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000 FCNTCNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 488059 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 488059 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT 11446.500 NPHI. CNAV 29 176 NRAT. CNAV 5.057 CRAT. CNAV NCNT CNAV 3178.222 FCNT. CNAV 639.365 CFTC. CNAV 619.534 CNTC. CNAV GRCH CNTD -999.250 TENS. CNTD 1335.000 DEPT 10798.000 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH CNTD 53.031 TENS. CNTD 1380.000 5. 402 3336. 925 -999.250 - 999. 250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 17 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NI]MBER 5 RAW CURVES Curves and log header data for each pass in separate fxles; raw background pass in last f~le PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 11454.5 10793.0 CNTD LOG HEADER DATA DATE LOGGED: 24 -APR- 97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 957 24-APR-97 TD DRILLER (FT) : 11650.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT) : 10800.0 BOTTOM LOG INTERVAL (FT) . 11447.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER .................................... GR GAM~A RAY CGRS 860 CCL COLLAR LOCATOR CPLC 831 CNTD COMP. NEUTRON CNTD 101 $ BOREHOLE AND CASING DATA LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 18 OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 10780.0 BOREHOLE CONDITIONS FLUID TYPE .. FLUID DENSITY (LB/G): SURFACE T~4PERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS 9-28-80 LIMESTONE MATRIX DID NOT TAG TD. WELL SHUT IN ®0730 4-24-97. SHUT IN WHP 1650. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 LIS Tape Verification L~stlng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 TYPE REPR CODE VALUE .............................. 1 4 66 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 488059 O0 000 O0 0 5 1 1 4 NPHI PS1 PU 488059 O0 000 O0 0 5 1 1 4 RTNR PS1 488059 O0 000 O0 0 5 1 1 4 TNRA PS1 488059 O0 000 O0 0 5 1 1 4 RCNTPS1 CPS 488059 O0 000 O0 0 5 1 1 4 RCFT PS1 CPS 488059 O0 000 O0 0 5 1 1 4 CNTC PS1 CPS 488059 O0 000 O0 0 5 1 1 4 CFTC PS1 CPS 488059 O0 000 O0 0 5 1 1 4 GR PS1 GAPI 488059 O0 000 O0 0 5 1 1 4 TENS PS1 LB 488059 O0 000 O0 0 5 1 1 4 CCL PS1 V 488059 O0 000 O0 0 5 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 PAGE: 19 ** DATA ** DEPT 11454.500 NPHI.PS1 27.464 RTNR.PS1 RCNT. PS1 3053 003 RCFT. PS1 621.908 CNTC. PS1 GR.PS1 13.172 TENS. PSi 885.000 CCL.PS1 DEPT. 10793.000 NPHI.PS1 42.363 RTNR.PS1 RCNT. PS1 1995.381 RCFT. PS1 320.377 CNTC. PS1 GR.PS1 48.219 TENS. PSi 1375.000 CCL.PS1 4. 909 TNRA. PS1 3201 . 489 CFTC. PS1 O. 026 6.118 TNRA.PS1 2068.625 CFTC. PSi 0.000 5.204 615.172 6.652 314.868 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE. 20 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFIE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate f~les; raw background pass in last f~le PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMFIARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 11458 0 10796.0 CNTD LOG HEADER DATA DATE LOGGED: 24 -APR- 97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 957 24-APR-97 TD DRILLER (FT) : 11650.0 TD LOGGER (FT) · O. 0 TOP LOG INTERVAL (FT) : 10800.0 BOTTOM LOG INTERVAL (FT) : 11447.0 LOGGING SPEED (FPHR). 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAM~L~ RAY CGRS 860 CCL COLLAR LOCATOR CPLC 831 CNTD COMP. NEUTRON CNTD 10I $ BOREHOLE AND CASING DATA LIS Tape Verification Llst~ng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE. 21 OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 10780.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS). 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS 9-28-80 LIMESTONE MATRIX DID NOT TAG TD. WELL SHUT IN @0730 4-24-97. SHUT IN WHP 1650. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 LIS Tape Verification Listing Schlumberger Alaska Computang Center 20-MAY-1997 15:56 PAGE: 22 TYPE REPR CODE VALUE .............................. 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 .............................. ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ....................................................................................... DEPT FT 488059 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 488059 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 488059 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 488059 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 488059 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 488059 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 488059 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11458 000 NPHI. PS2 27.756 RTNR.PS2 4.941 TNRA.PS2 RCNT. PS2 3166.078 RCFT. PS2 640.754 CNTC. PS2 3320.063 CFTC PS2 GR.PS2 21.078 TENS.PS2 905.000 CCL.PS2 0.021 DEPT. 10796.000 NPHI.PS2 47.242 RTNR.PS2 7.000 TNRA.PS2 RCNT. PS2 2061.135 RCFT. PS2 314.754 CNTC. PS2 2212.015 CFTC. PS2 GR.PS2 51.969 TENS.PS2 1350.000 CCL.PS2 0.000 5.238 633.813 7. 097 317. 029 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-MAY-1997 15.56 PAGE: 23 **** FILE TRAILER **** FILE NAME . EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files, raw background pass in last file PASS NUMBER. 3 DEPTH INCREF~ENT: 0.5000 FILE SUM~b~RY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 11456.5 10796.0 CNTD LOG HEADER DATA DATE LOGGED: 24 -APR- 97 SOFTWARE VERSION: CP 42.2 TIME LOGGER ON BOTTOM: 957 24-APR-97 TD DRILLER (FT) · 11650.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT) : 10800.0 BOTTOM LOG INTERVAL (FT) : 11447.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER .................................... GR GAMMA RAY CGRS 860 CCL COLLAR LOCATOR CPLC 831 CNTD COMP. NEUTRON CNTD 101 $ BOREHOLE AND CASING DATA LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 PAGE: 24 OPEN HOLE BIT SIZE (IN) DRILLRRS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 10780.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS 9-28-80 LIMESTONE MATRIX DID NOT TAG TD. WELL SHUT IN ®0730 4-24-97. SHUT IN WHP 1650. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center 20-MAY-1997 15:56 TYPE REPR CODE VALUE .............................. 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX) ....................................................................................... DEPT FT 488059 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 488059 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 488059 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 488059 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 488059 O0 000 O0 0 ? 1 1 4 68 0000000000 RCFT PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 488059 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 488059 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 488059 O0 000 O0 0 7 1 1 4 68 0000000000 ....................................................................................... PAGE: 25 ** DATA ** DEPT. 11456.500 NPHI.PS3 31.099 RTNR.PS3 5.290 TNRA.PS3 RCNT. PS3 3215.686 RCFT. PS3 607.843 CNTC. PS3 3372 084 CFTC. PS3 GR.PS3 17.000 TENS.PS3 1095.000 CCL.PS3 0 035 5.608 601.259 ** END OF DATA ** LIS Tape Verification L~st~ng Schlumberger Alaska Computing Center **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 20-MAY-1997 15:56 PAGE: 26 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/05/20 ORIGIN : FLIC TAPE NAME : 97195 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/05/20 ORIGIN : FLIC REEL NAME : 97195 CONTINUATION # · PREVIOUS REEL : COF~4ENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00