Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout180-083• STATE OF ALASKA •
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended
zaAACZS.~os zoAACZS.~~o
^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1 b. Well Class:
®Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., o ba ..
6/28/2010 12. Permit to Drill Number:
180-083 310-106
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded:
09/07/1980 13. API Number:
50-029-20497-00-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached:
09/27/1980 14. Well Name and Number:
PBU J-13
FEL, SEC. 09, T11 N, R13E, UM
1049
FNL, 803
Top of Productive Horizon:
3739' FSL, 2323' FWL, SEC. 03, T11 N, R13E, UM g. KB (ft above MSL): 69.1'
GL (tt above MSL): 40.27'
15. Field /Pool s
()~
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
4048' FSL, 2583' FWL, SEC. 03, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD):
9609' 7723' Oil Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 643555 y- 5970304 Zone- ASP4 10. Total Depth (MD+TVD):
11800' 9447' 16. Property Designation:
ADL 028281
TPI: x- 646578 y- 5975153 Zone- ASP4
Total Depth: x- 646832 Y- 5975466 Zone- ASP4 11 • SSSV Depth (MD+TVD):
N/A 17. Land Use Permit:
f P
f
t
TVD
Thi
k
18. Directional Survey: ^ Yes ®No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore:
N/A ft MSL erma
ros
(
):
ness o
20.
c
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
DIL / GR, DIL / LL8 / SP / GR, BHCS / GR, FDC / CNL /CAL / GR, CBL / VDL / GR / CCL 22. Re-DrilULateral Top Window MD/TVD:
N/A
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
" 3 " Insulated n u r rface 110' S rf 110' 6" 12 cu Arctics
/ " 72# 2 2 Ar i I
9-5/ " 47# L-80 urface 10780' rf 8592' 12-1/4" 1535 c ft 'G' 1 0 ft A I & 707 cu 'G'
7" 29# L-80 1 264' 1179 ' 2 443' 8-1/ " 427 las '
24. Open to production or injection? ^ Yes ®No 25. TuewG RECORD
If Yes, list each interval open
Perforation Size and Number):
MD+TVD
f T
& Bottom SIZE DEPTH SET MD PACKER SET MD / TVD
;
(
o
op 7", 26# x 4-1/2", 12.6#, L-80 10333' 10226' / 8176'
MD TVD MD TVD Cut at 9800'
26. ACID, FRACTURE,. CEMENT SQUEEZE, ETC:
DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED
" ,;, f, ~ ~
;~ I . ~,
* ,
•
~" - 9852' P&A w/ 45 6bls Class'G' '
_
. 9639' Set EZSV (to cut 9-5/8" casing at 1751') ,
9593' Set Whipstock (Top of Window at 9609') .
27. PRODU CTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: Production For
Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Calculated
24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
28. CORE DATA Conventi onal Core(s) Acqui red? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and res n of water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory an~j i~ a 250.071.
n '
None ~~~ ~ ,~~, ~~1~~
~~
RBOMS ,~J~, ~ 9 ~Illtsk~ ~ $~ Gas Cis. Ctxnmission
Form 10-407 Revised 12/2009 CONTINUED ON REVERSE ~ 5uomlt unglnal unly
29. GEOLOGIC MARKERS (List all formations and ma ncountered): 30. NATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Sag River 10874' 8665' None
Shublik 10927' 8707'
Ivishak 11025' 8786'
Formation at Total Depth (Name):
31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~
~
J/~
~~~
Signed: Terrie Hubble Title: Drilling Technologist Date:
/ v
PBU J-13 180-083 310-106 Prepared By Name/IVumber. Terrie Hubble, 564-4628
Well Number Permit No. /Approval No. Drilling Engineer: Jacob Thompson, 564-5579
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 12/2009 Submit Original Only
•
J-13, Well History (Pre Rig Sidetrack)
Date Summary
4/26/2010 T/I/O=SSV/50/0+, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS), pre RST.
PPPOT-T: Stung into test port (0+ psi), bled to 0 psi. Function LDS, 4 LDS stuck (flagged) all the rest
moved freely (2.5 "). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost
100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi.
PPPOT-IC: Stung into test port (50 psi), bled to 0 psi. Function LDS, all moved freely (2.5 "). Pumped
through void, good returns. Pressured void to 3500 psi for 30 min test, lost 0 psi in 30 min (PASS). Bled
void to 0 psi.
4/28/2010 WELL SHUT IN ON ARRIVAL. PULL PRONG (1-3/8" F.NECK, 1.50" BODY, 84.5" OAL) IN 2-7/8" PLUG
BODY C~3 10,297 SLM. RIH TO PULL PLUG BODY ~ 10300 SLM.
4/29/2010 MADE SEVERAL ATTEMPTS TO PULL NIP. REDUCER AT 10300' MD (unsuccessful). RAN 2 7/8" GS
TO LATCH P-PLUG BODY (unsuccessful). RAN 1-1/2" PUMP BAILER TO 10293' SLM (recovered
plastic coated tubing). STANDBY FOR HIGH WINDS.
5/3/2010 ARRIVE ON LOCACTION, WELL S/I. MADE SEVERAL RUNS WITH 10'- 2.25" PUMP BAILER W/
SNORKEL BOTTOM. RAN KJ, 2.24" CENT., 2 7/8" GS (unable to latch). RAN 10'- 1.75" PUMP BAILER
WITH MULE SHOE FLAPPER.
5/4/2010 MADE TWO RUNS WITH KJ, 5'- 2.25" PUMP BAILER WITH SNORKEL BOTTOM. PULL 2 7/8" PX
PLUG BODY FROM 10292' SLM (10300' MD). PULL 4 1/2" x 2 7/8" NIPPLE REDUCER FROM 10291'
SLM (10300' MD). LOCATE TUBING TAIL AT 10323' SLM (10340' ELMD) + 17' CORRECTION. TAG
TD AT 11576' SLM + 17' CORRECTION = 11593' ELMD. WELL LEFT S/I ON DEPARTURE, PAD OP
NOTIFIED OF VALVE POSITIONS.
5/8/2010 T/I/0=0/0/0 (Infectivity Test for P&A) Pump 10 bbl neet meth spear down TBG followed by 1 %KCL at
Max rate not to exceed 3000 Psi.
5/9/2010 Continue pumping 1%KCL down TBG Max Rate C«~ 3000 Psi. Rate. Pump rate gradually came up from 1
bpm C~ 3000 Psi to 5 bpm C~! 430 bbls away C~ 2650 Psi. Went to 5.5 bpm C~ 475 bbls away and 2550
Psi. Pumped remaining 1% KCL ~ 5.5 bpm for a total of 855 bbls away. Pumped 5 bbls neet meth
down TBG. Standby for fluid support. Pump 100 bbls dead crude followed by 5 bbls diesel down TBG to
freeze protect. RDMO. Standby to monitor pressures and fluid in cellar. FW HP= 0/80/0 Operator
notified of valve postions. Performed H2S table top drill. Discussed emergency procedures.
5/16/2010 T/I/O =Vac/170/0. Temp = SI. T, IA & OA FL's (Pre FB). No flowline or AL. TBG FL & OA FL near
surface. IA FL C~3 surface.
5/19/2010 Fullbore P&A. MIRU SLB cementers. Fli i ack wall with 550 bbls 1 %KCL and P&A with 45 bbls 15.8
ppg "G" cement. Displace cement with diesel. Estimated TOC - 10 091'. _RDMO. Left 1000 psi on well.
DHD to monitior Tubing psi., tanks released and Valve Shop notified to service tree. Job Complete.
5/20/2010 WELL S/I ON ARRIVAL. TAGGED TOC C~ 9,852' SLM W/ 3.50" CENT, 3.00" S-BLR (Sample of
cement). DRIFT TO TUBING HANGER W/ 6.335" DUMMY BPV (Good ring on drift bottom). DRIFT
TUBING TO 9,835' SLM (Target 9,800') W/ 5.76" CENT (No issues). CURRENTLY POOH W/ 5.76"
CENT.
5/21/2010 PERFORMED SUCCESSFUL MIT-T TO 2500 PSI W/ TRI-PLEX (See data tab #6). WELL S/I ON
DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS.
5/21/2010 WELL SI ON ARRIVAL. INITIAL T/I/O = 1000/500/0 SPOT IN AND RIG UP ELINE.
5/22/2010 CUT TUBING AT 9800' WITH OWEN 5.5" EXPLOSIVE CUTTER. H2S MAN DOWN DRILL WITH
CREW AND WELLSITE LEADER. FINAL T/I/O = 650/600/0 JOB COMPLETE. WELL LEFT SI.
Page 1 of 2
•
J-13, Well History (Pre Rig Sidetrack)
Date Summary
5/23/2010 T/I/0= 600/600/20 Temp= S/I Circ-Out, CMIT-TxIA PASSED to 3500 psi (Pre CTD) Pumped 5 bbl
Neat meth spear followed by 729 bbls 110°F 1 % KCL down the IA, through the jet-cut C~ 9800', up Tbg
taking returns to J-08 Flowline. Pumped 160 bbl Diesel freeze protect into IA. U-tubed freeze protect into
Tubing for 1 hour. CMIT-TxIA: Pressured up TxIA w/ 6.5 bbls diesel. TxIA lost 80/80 psi in 1st 15 mins
and 40/40 psi in 2nd 15 mins for a total loss of 120/120 psi in 30 min test. Final W HPs 0/0/0
5/24/2010 T/I/0=0/VAC/0, Temp=Sl. Remove and replace 4 stuck LDS.
4 stuck LDS on TBG head (flagged). Stung into TBG hanger test void (0+ psi), bled to 0 psi. Verify 0 psi
on TBG & IA. Freed up 3 of 4 stuck LDS, replaced with new assemblys. The LDS that is still stuck is
above the IA valve. Will need to swap IA valve to other side of tubing head for drill clearance.
5/25/2010 T/I/O=0/VAC/0, Temp=S1 Attempt to remove stuck LDS
RU 1 HP BT onto THA test void 0 psi. 1 LDS "Standard" stuck, attempted to remove flats broke. W IE
notified of condition of well. WIE instructed to wrap up job FMC JIT will have service cut nose off LDS
under Rig.
Page 2 of 2
•
North America -ALASKA - BP Page 1 °~ 2
Operation Summary Report
Common Well Name: J-13 AFE No
Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 ~ End Date: X3-OOV33-C (635,950.00 )
I
I
_ _
_{
Project: Prudhoe Bay Site: PB J Pad i
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
6/2/2010 07:00 - 12:00 5.00 MOB N WAIT PRE MOVE DOYON 141 OFF OF WELL # W-01 A.
STAGE ON W-PAD TO PERFORM GENERAL
MAINTENANCE WHILE WAITING ON HIGH WATER
AT THE KUPARUK RIVER.
12:00 - 21:00 9.00 MOB N WAIT PRE i PERFORM GENERAL MAINTENANCE WHILE
WAITING ON HIGH WATER AT THE KUPARUK
RIVER.
-
21:00 - 00:00 (
3.00 ~
MOB ----
P - -
PRE
CHECK SIX TRAINING FOR BOTH DRILLING
I CREWS. _ _
6/3/2010 00:00 - 03:00 3.00 MOB P PRE CHECK5IX TRAINING BOTH CREWS.
03:00 - 06:00 3.00 MOB N WAIT PRE WAIT ON BRIDGE ACCESS ACROSS KUPARUK
RIVER. PERFORM GENERAL MAINTENANCE AND
CLEAN RIG.
06:00 - 00:00 18.00 MOB N _
WAIT PRE WAIT ON-BRIDGE ACCESS ACROSS KUPARUK
RIVER. PERFORM PREVENTIVE MAINTENANCE
I I PER DOYON MP2 SCHEDULE, HOUSEKEEPING,
CLEANING PARTS VANS, SDPOT AND RIG UP
ENVIROVAC, REPLACED PIPE SHED DOOR LIFT
CABLES, REPAIR ACCUMULATOR AIR PUMP,
REPAIR HYDRUALIC LEAKS ON ACCUMULATOR,
REPLACED BLADDERS IN THREE
ACCUMULATOR BOTTLES, REPAIR LEAK ON
ACCUMULATOR AIR PUMP AND TEST
ACCUMULATOR POP-OFF TO 3,500-PSI.
6/4/2010 00:00 - 06:00 6.00 MOB N WAIT ' PRE CONTINUE WAITING FOR KUPARUK RIVER
BRIDGE ACCESS TO MOVE RIG TO J-13A.
CONTINUED WORKING ON GENERAL RIG
MAINTENANCE AND HOUSEKEEPING.
06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER
BRIDGE ACCESS TO MOVE RIG TO J-13A.
I CONTINUED WORKING ON GENERAL RIG
MAINTENANCE AND HOUSEKEEPING.
6/5/2010 00:00 - 06:00 6.00 MOB N WAIT _ PRE CONTINUE WAITING FOR KUPARUK RIVER
BRIDGE ACCESS TO MOVE RIG TO J-13A.
CONTINUED WORKING ON GENERAL RIG
MAINTENANCE AND HOUSEKEEPING. __
06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER
BRIDGE ACCESS TO MOVE RIG TO J-13A.
i CONTINUED WORKING ON GENERAL RIG
MAINTENANCE AND HOUSEKEEPING. SPOTTED
,SUB AND RIG COMPLEXES TOGETHER ON
SOUTHEAST CORNER OF W PAD.
RECONNECTED SERVICE LINES AND POWERED
~ UP RIG. REMOVED DOUBLE FLANGE 13-5/8"
-~ I
- SPACER SPOOL FROM BOP STACK.
Printed 7/1/2010 11:32:45AM
•
North America -ALASKA - BP Page 2 of ='
Operation Summary Report
Common Well Name: J-13 AFE No
Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 End Date: X3-OOV33-C (635,950.00 )
__ _
Project: Prudhoe Bay Site: PB J Pad i
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
__
6/6/2010 00:00 - 00:00 24.00 _
MOB N WAIT PRE -CONTINUE WAITING FOR KUPARUK RIVER
BRIDGE ACCESS TO MOVE RIG TO J-13A.
CONTINUED WORKING ON GENERAL RIG
i MAINTENANCE AND HOUSEKEEPING. WORK ON
~ ~ DERRICK MAINTENANCE AND REPAIRS PER BILL
HOPKINS AUDIT. WSL - HEFLEY: VISUALLY
INSPECTED AND VERIFIED INTEGRITY OF
ANNULAR PREVENTER ELASTOMER
CLOSING/SEALING ELEMENT. NO VISIBLE
~ TEARS OR MISSING MATERIAL OBSERVED
FROM ELEMENT.
INSPECTED LINERS, SWABS, VALVES AND
SEATS IN MUD PUMPS #1 & #2. NO FAILURES
OR EXCESSIVE WEAR IN ANY COMPONENTS.
_-_-.
6/20/2010 ___
06:00 - 18:00
12.00
MOB
P
PRE
JACK UP BOILER,'MOTOR ROOM, PUMP, AND
~ PITS, COMPLEX AND HOOK UP TO PEAK SOWS.
~
~
- MOVE FROM W-PAD TO J-13A. HOOK UP TO
~ THE SUB COMPLEX AND MOVE FROM W-PAD TO
I i J-13A: SPOT BASE OVER WELL AND LAY
MATS AND SPOT COMPLEXES. LOWER AND
SECURE ALL STAIRWAYS. HOOK UP SERVICE
LINES BETWEEN ALL COMPLEXES. PRESSURE
ON THE WELL WHEN MOVING OVER WAS 0 PSI
i
~ ON THE OA AND IA.
- ~-----
18:00 - 00:00 6.00 MOB P PRE -RIG ACCEPTED @ 18:00 ON 6/2 012 0 1 0
SPOTTED OPEN TOP BLEED TANK AND
HARDLINED INTO WELLHEAD. PRESSURE TEST
TUBING X INNER ANNULUS TO 2000 PSI FOR 10
MINUTES. NO PRESSURE BLED OFF DURING
TEST. GOOD TEST. OA AND IA 0 PSI WHEN
MOVED ONTO WELL.
6/21/2010 00:00 - 03:30 3.50 MOB P PRE TAKE ON HEATED 8.5 PPG SODIUM CHLORIDE
INTO THE PITS. RIG UP ALL THE CIRCULATING
LINES IN THE CELLAR. PRESSURE TEST THE
HARDLINE TO 3500 PSI. GOOD TEST.
Printed 7/1/2010 11:32:45AM
•
North America -ALASKA - BP Page 1 ~
Operation Summary Report
___-
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
__
6/21/2010 03:30 - 04:30 1.00 DHB P DECOMP RIG UP AND PRESSURE TEST LUBRICATOR TO
500 PSI. GOOD TEST. PULL THE BPV FROM THE
WELLHEAD AND RIG DOWN THE BPV.
04:30 - 05:00 0.50 CLEAN P DECOMP PRIME UP THE MUD PUMPS AND CIRCULATE
THROUGH THE LINES TO VERIFY ALL LINES AND
CONNECTIONS ARE HOLDING.
-
----- 05:00 - 09:45 -
4.75 ~ -
CLEAN P DECOMP RIG UP AND REVERSE CIRCULATE 8.5 PPG
~ ( SODIUM CHLORIDE AT 3 BPM WITH 500 PSI FOR
~ i 1p5 BBLS UNTIL THE RETURNS WERE DIESEL
FREE. SHUT DOWN AND SWAP OVER TO PUMP
THE IONG''.WAY. CIRCULATE 40 BBLS
FOLLOWED BY THE 35 BBLS SAFE SURF PILL.
PUMPED A TOTAL DF 730 BBLS THE LONG WAY
TAKING RETURNS TO THE OPEN TOP TANK.
I PUMPED AT3 BPM WTIH 200 PSI, 4 BPM WITH
400 PSI, 5 BPM WITH 600 PSI, AND 6 BPM 900 PSI
FCP:
09:45 - 10:15 0.50 CLEAN P DECOMP BLOW DOWN AND RIG DOWN THE CIRCULATING
LINES. OA = 0 PSI
10:15 - 11:00 0.75 ; DHB ' P DECOMP RIG UP AND DRY ROD IN THE TWC.
11:00 - 12:30 1.50 DHB N SFAL DECOMP RIG UP TEST EQUIPMENT TO TEST THE TWC.
ATTEMPT TO TEST THE TWC FROM THE TOP 3
TIMES. ATTEMPTS FAILED. FLANGE BETWEEN
MASTER AND SWAB VAVLE LEAKING. BLED
OFF PRESSURE AND HAMMERED UP THE
FLANGES.
12:30 - 13:30 1.00 DHB. ` P DECOMP TEST THE TWC FROM THE BOTTOM TO 2000 PSI
FOR 30 MINUTES. GOOD TEST. LOST 50 PSI IN
FIRST 15 MINUTES AND 15 PSI IN SECOND 15
MINUTES. ____
1 13:30 - 15:00 1.50 DHB P DECOMP TEST THE TWC FROM THE TOP TO 3500 PSI FOR
10 MINUTES. GOOD TEST. LOST 30 PSI IN FIRST
5 MINUTES AND 10 PSI IN SECOND 5 MINUTES.
15:00 - 16:00 1.00 ~ DHB P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING
HOSES. CLEAR CELLAR TO NIPPLE DOWN THE
TREE.
16:00 - 16:30 0.50 _
WHSUR P DECOMP RIG UP AND PREPARE TO NIPPLE DOWN THE
TREE AND ADAPTER FLANGE.
16:30 - 18:45 2.25 WHSUR P DECOMP NIPPLE DOWN TREE AND ADAPTER FLANGE.
ADAPTER FLANGE SIEZED UP. HOLD HAZARD
ASSESSMENT FOR BREAKING ADAPTER
FLANGE LOOSE. WRAP ADAPTER FLANGE AND
STEAM. HOOK UP TOP DRIVE ELEVATORS AND
SLING TO HOLD TREE. USE 2 PORTA POWER
HYDRAULIC JACKS TO BREAK ADAPTER
FLANGE FREE. FMC FIXED THE BROKEN LDS
THAT WAS RECOGNIZED PRE-RIG. TEST FITTED
THE TUBING HANGER CROSS-OVER SCREWED
IN 5.75 TURNS.
Printed 7/1/2010 11:33:19AM
North America -ALASKA - BP ~'~ ~~ 2 ~'
Operation Summary Report
__
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations
(hr) (ft) _
_
18:45 - 19:15 0.50 WHSUR P DECOMP REMOVE THE TREE AND ADAPTER FLANGE
FROM THE CELLAR.
19:15 - 23:00 3.75 BOPSUR P DECOMP NIPPLE UP BOP STACK WITH 3' SPACER SPOOL.
BOP CONFIGURATION IS AS FOLLOWS:
- 13-5/8" ANNULAR
- 7" FIXED RAMS
- BLIND SHEAR RAMS
I =2-7/8"'X 5" VBRS
23:00 - 00:00 , 1.00 BOPSUR i P DECOMP BODY TEST THE BOP EQUIPMENT TO 250 PSI
j ~ LOW AND 3500 PSI HIGH. HAD LEAK IN THE
FLANGE BETWEEN HCR AND MANUAL CHOKE,
ALSO CHOKE 10 AND 11 HAD MINOR LEAKS.
BLED OFF PRESSURE AND TIGHTENED UP.
----
6/22/2010
00:00 - 01:00
1.00
BOPSUR
P
DECOMP
BODY TEST7HE BOP EQUIPMENT AND CHOKE
I ~ MANIFOLD TO 250 PSI LOW AND 3500 PSI HIGH
1 I FOR 5 CHARTED MINUTES EACH. GOOD TEST.
1 --- --
01:00 - 09:30
8.50 -
BOPSUR
P -
DECOMP
TEST ROPE TO 250 PSI LOW AND 3,500 PSI
HIGH: HOLD EACH TEST FOR 5 MINUTES ON THE
CHART. TEST ANNULAR WITH 4"TEST JOINT.
~ ~ TEST UPPER 7" RAMS WITH 7" TEST JOINT AND
LOWER 2-7/8" X 5" VBRS WITH 4" TEST JOINT.
j TEST UPPER 7" RAMS, LOWER 2-7/8" X 5" VBRS,
I BLIND SHEAR, ANNULAR, CHOKE MANIFOLD
I VALVES, MANUAL KILL AND CHOKE LINE
VALVES, HCR KILL AND CHOKE LINE VALVES,
FLOOR VALVES, UPPER AND LOWER IBOP
VALVES ON TOP DRIVE.
-PERFORM ACCUMLATOR TEST.
I
i -ISSUES WITH THE MANUAL CHOKE AND SUPER
I CHOKE BEING LOOKED AT BY THE MECHANIC.
-CHANGING OUT THE KILL LINE HOSE.
- AOGCC WITNESS OF TEST BY CHUCK
i SCHEVE.
-TEST WAS WITNESSED BY BP WSL CHRIS
KOBUCK AND DOYON TOURPUSHER JOHN
PIPER.
-TESTED H2S AND LEL ALARMS.
09:30 - 12:00 2.50 WHSUR P DECOMP R/U DUTCH RISER, R/U DSM LUBRICATOR AND
TEST TO 500 PSI.
-PULL TWC. WELL STATIC.
~ -R/D AND UD DSM LUBRICATOR.
12:00 - 12:30 0.50 WHSUR P i - DECOMP UD DUTCH RISER
12:30 - 13:00 j 0.50 PULL ~ P ~ DECOMP R/U CASING TONGS AND SCHLUMBERGER
CONTROL LINE SPOOLING UNIT.
13:00 - 14:00 1.00 PULL P ~ _ I DECOMP M/U LANDING JOINT WITH IJ4S XO AND SCREW
INTO TUBING HANGER. 6-1/2 TURNS. BACK OUT
LOCK DOWN SCREWS.
14:00 - 14:30 0.50 PULL P DECOMP PULL HANGER TO RIG FLOOR. HANGER CAME
OFF SEAT AT 210K, TUBING CAME FREE AT
305K. UP WEIGHT 275K.
14:30 - 15:30 1.00 PULL P DECOMP CIRCULATE BOTTOMS UP AT 6 BPM WITH 1,500
PSI. NO GAS OR CUTTINGS AT BOTTOMS UP.
Printed 7/1/2010 11:33:19AM
r~
North America -ALASKA - BP P~Qe ~ ~'
Operation Summary Report
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.tft (above Mean Sea level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
15:30 - 19:15 3.75 PULL P DECOMP UD TUBING HANGER, POOH LAYING DOWN 7",
IJ4S, L-80 TUBING. RECOVERED 53 JTS. WITH
CONTROL LINE. 26 CLAMPS AND 2 STAINLESS
STEEL BANDS AND 1 SSSV. PULLED 270K TO
UNSEAT THE TUBING HANGER.
19:15 - 20:15 1.00 PULL P DECOMP RIG DOWN CONTROL LINE SPOOLER, CLEAN
THE FLOOR OF ANY UN-NEEDED TOOLS AND
INSTALL A STRIPPING RUBBER.
20:15 - 00:00 3.75 PULL P __ DECOMP CONTINUE POOH LAYING DOWN 7", IJ4S, L-80
TUBING. TOTAL OF 149 JTS.
6/23/2010 ___
00:00 - 04:00 4.00 _
PULL P DECOMP CONTINUE POOH U~YING DOWN 7", IJ4S, L-80
TUBING: 'TOTAL OF 257 JOINTS AND 1 CUT
JOINT (18.73') WITH AVERAGE BREAK OUT OF
~ 30K FT/LBS: PIPE WAS IN VERY GOOD
CONDITION WITH:NO VISUAL CORROSION OR
PARAFIN: _ _
04:00 - 05:00 _
1.00 PULL P DECOMP CLEAR AND CLEAN THE RIG FLOOR OF ALL
CASING EQUIPMENT AND DEBRIS ON THE
FLOOR.
-
------ 05:00 - 07:30 I -
2.50 BOPSUR P DECOMP CHANGE OUT UPPER RAMS TO 3-1/2" X 6"
~ ~ VBRS.
-TEST RAMS TO 250 PSI LOW AND 3,500 PSI
HIGH.
-HOLD EACH TEST FOR 5 MINUTES ON THE
CHART. GOOD TEST.
-
-- ------ -
07:30 - 09:00 1.50 BOPSUR P DECOMP SLIP AND CUT 72' OF DRILLING LINE.
-SERVICE TOP_DRIVE _ _
09:00 - 10:30 ( 1.50 EVAL P - DECOMP PJSM WITH ALL PERSONNEL INVOLVED.
- _ ~
- -{
-- ~ _ -SPOT AND R/U SCHLUMBERGER E-LINE UNIT.
-
10:30 - 15:45 ~ 5.25 EVAL P ~ DECOMP RIH WITH 8.5" GAUGE RING AND JUNK BASKET.
-TAG UP AT 2,606'. (DV COLLAR ON 9-5/8" CSG
TALLY)
-POOH WITH GAUGE RING.
-RECOVERED 2 PIECES OF ENCAPSULATION IN
JUNK BASKET.
-REPLACE GAUGE RING WITH 8.3" OD RING.
-RIH, WENT THROUGH DV WITHOUT PROBLEMS.
RIH TO 9,800' STARTED TAKING WEIGHT,
PULLED TIGHT WHEN STARTING OFF BOTTOM.
-RECOVERED 1-1/2 GALLONS OF
ENCAPSULATION. _
15:45 - 16:00 0.25 EVAL P _ DECOMP CHANGE OUT E-LINE TOOL TO USIT LOGGING
TOOL.
16:00 - 18:45 2.75 EVAL P _ DECOMP RIH WITH USIT LOGGING TOOL TO 3000'. TOOL
WAS HAVING TELEMETRY ISSUES.
18:45 - 19:15 0.50 EVAL N DFAL 3,000.0 DECOMP POOH WTIH USIT LOGGING TOOL AND
LAYDOWN THE USIT TOOL. __
19:15 - 22:00 _
2.75 EVAL N DFAL 3,000.0 DECOMP CHANGE OUT USIT LOGGING TOOL AND RUN
BACK IN THE HOLE TO 3000'.
~
22:00 - 00:00 2.00 EVAL P DECOMP LOG FROM 3000' TO SURFACE WITH THE FIRST
PASS OF THE USIT LOG.
6/24/2010 00:00 - 01:30 _
1.50 EVAL P __
DECOMP RUN SECOND PASS FROM 2600' TO 1700' TO
VERIFY CEMENT TOP.
Printed 7/1/2010 11:33:19AM
~~
North America -ALASKA - BP Page 4 rsP42'
Operation Summary Report
_ - ___ _ -
Common Well Name: J-13 ' AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 ~ End Date: X3-OOV33-C (3,373,960.00 )
I
_
_
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date ~ From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations
(hr) (ft) ____
__ __ 01:30 - 03:00 1.50 EVAL P DECOMP RIG DOWN USIT TOOLS AND RIG UP TO RUN
9-5/8" EZSV. _
03:00 - 05:00 2.00 EVAL P DECOMP RUN IN THE HOLE ON E-LINE WITH 9-5/8" EZSV
A D SET AT 9639'.
05:00 - 06:30 1.50 EVAL P _ DECOMP POOH WITH E-LINE.
06:30 - 07:30 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E-LINE.
07:30 - 09:15 1.75 CLEAN P DECOMP PICK UP AND MAKE UP BAKER 9-5/8" CASING
CUTTER.
09:15 - 10:45 1.50 PULL P DECOMP SINGLE IN THE HOLE ON 4" DRILLPIPE TO 1730'.
~ BREAK`CIRCULATION AT 5 BPM WITH 500 PSI.
CONTINUE''IN THE:HOLE TO 1760'.
10:45 - 11:15 0.50 PULL P DECOMP LOCATE THE COLLAR @ 1741' AND RIH TO
1751' AND SET ON DEPTH TO CUT THE CASING.
11:15 - 12:00 0.75 PULL P DECOMP ~ RIG UP AND SPOT LRS, RIG UP THE CEMENT LINE
~ TO THE STAND PIPE.
12:00 - 13:30 1.50 PULL P DECOMP CUT9-5/8" CASING 1751'. ROTATE AT 60
RPM, 1 K fREE TQ AND 4-6K CUTTING TQ AT 6
BPM WITH 900 PSI.
13:30 - 15:00 1.50 PULL P DECOMP PUMP AND SPOT 18 BBLS OF 120 DEG DIESEL
INTO THE DRILLPIPE, CLOSE THE BAG AND
CONTINUE TO PUMP 82 BBLS OF HEATED DIESEL
AT 1.5 BPM WITH 350 PSI OUT THROUGH THE
CUT INTO THE OA TAKING THE RETURNS OUT
~ TO THE OPEN TOP TANK. ALSO HAD SMALL
~ AMOUNT OF RETURNS THROUGH THE FLUTES.
FOLLOWED BY 20 BBLS OF 9.8 PPG HEATED
BRINE AT 6 BPM WITH 800 PSI.
15:00 - 16:00 1.00 PULL P _ DECOMP ALLOW DIESEL TO SOAK ON THE OA TO HELP
BREAK UP THE ARCTIC PACK.
16:00 - 17:30 1.50 PULL P DECOMP BEGIN DISPLACING OA TO THE OPEN TOP TANK
WITH 270 BBLS OF HEATED 9.8 PPG BRINE
FOLLOWED BY 35 BBLS OF ASAFE-SURF-0
SWEEP CHASED BY 175 BBLS OF 8.5 PPG
SEAWATER. ALL FLUIDS PUMPED STARTING AT
1.5 BPM WITH 350 PSI STAGED UP TO 6 BPM
WITH 1000 PSI.
17:30 - 17:45
I 0.25 PULL P DECOMP FLOW CHECK THE WELL. STATIC.
_ _ _
17:45 - 19:30
1.75 _
PULL
P ~
DECOMP
POOH AND LAYDOWN THE CASING CUTTER.
~ 19:30 - 20:00 0.50 PULL P DECOMP AAR WITH RIG CREW AND BAKER FISHING
_ HAND.
20:00 - 20:30 0.50 PULL _
P DECOMP PICK UP AND MAKE UP THE 9-5/8" CASING
SPEAR.
20:30 - 23:00 2.50 PULL P DECOMP PICK UP AND RIG UP THE 9-5/8" CASING
EQUIPMENT.
23:00 - 00:00 1.00 PULL P DECOMP SPEAR INTO THE 9-5/8" HANGER AND PICKUP
15K TO CONFIRM LATCH. HAVE FMC BOLDS.
6/25/2010 i 00:00 - 01:30 1.50 CLEAN P DECOMP BREAK FREE 9-5/8" HANGER AND PACK OFF
FREE AT 140K. PULL TO FLOOR AND BREAK
OUT THE SPEAR. LAY DOWN THE PACK-OFF
i AND HANGER.
Printed 7/1/2010 11:33:19AM
•
North America -ALASKA - BP ~aa~ s oil
Operation Summary Report
-- _ -----
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI: _
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To ~ Hrs Task ~ Code NPT NPT Depth ~ Phase Description of Operations
(hr) (ft)
______ 01:30 - 03:00 ~ _
1.50 CLEAN P DECOMP SCREW IN CROSS OVER AND MAKE UP TO THE
~ TOP DRIVE. CIRCULATE AND RECIPROCATE
9-5/8" CASING OVERBOARDING THE RETURNS
TO THE ROCKWASHER. SAW SIGNIFICANT
AMOUNT OF ARCTIC PACK FOR FIRST 30 BBLS,
THEN IT DIED OFF. CIRCULATED A BOTTOMS UP
(130 BBLS) STARTING AT 3 BPM WITH 120 PSI
STAGING UP TO 8 BPM WITH 120 PSI.
03:00 - 07:00 4.00 CLEAN P DECOMP BEGIN BREAKING OUT AND LAYING DOWN THE
9-5/8" N-80 47# BTC CASING. RECOVERED 44
~ JOINTS OF CASING PLUS 10.23' CUT JOINT OF
~ ' CASING.. _
07:00 - 08:00 ~ 1.00 _
CLEAN P _
_ DECOMP R/D CASING HANDLING EQUIPMENT.
~ -CLEAR AND CLEAN RIG FLOOR.
08:00 - 09:00 1.00 CLEAN P DECOMP BRING BHA TO RIG FLOOR AND BEGIN TO M/U
9-5/8".DRESS-OFF BHA.
09:00 - 10:00 1.00 CLEAN P bECOMF HOLD MEETING WITH CREW, ROTARY DRILLING
MANAGER'MIKE SCHULTZ AND FIELD
SUPERINTENDENT ALAN MADSEN. DISCUSS
WELL CONTROL.
10:00 - 11:00 1.00 - CLEAN ' P DECOMP; M/U 9-5/8"DRESS-OFF BHA. BHA = 9-5/8"
DRESS-OFF SHOE, WASHPIPE EXT, 9-5/8"
DRESS-OFF MILL(INSIDE WASHPIPE), 11-3/4"
WASHOVER BOOT BASKET, DOUBLE PIN SUB,
13-3/8" SCRAPER, BIT SUB, XO, FLOAT SUB,
BUMPER SUB, (9) 6-3/4" DC'S, XO. TOTAL BHA
LENGHT = 313.32'
11:00 - 12:00 1.00 CLEAN - P DECOMP RIH WITH DRESS-OFF BHA ON 4" XT-39
DRILLPIPE FROM THE DERRICK FROM 313' TO
87T
12:00 - 12:30 0.50 CLEAN P DECOMP CIRCULATE AND RECIPROCATE AT 877'
PUMPING AT 9 BPM WITH 400 PSI ICP AND
DECREASED TO 5 BPM WITH 200 PSI TO KEEP
ARCTIC PACK IN THE RETURNS.
12:30 - 12:45 0.25 CLEAN P DECOMP FLOW CHECK THE WELL. STATIC.
12:45 - 13:00 0.25 CLEAN P DECOMP RIH TO 1751' WITH DRESS OFF ASSEMBLY.
~ 13:00 - 13:45 0.75 CLEAN P DECOMP DRESS OFF STUMP AT 80 RPM WTIH TO 2-8K
PUMPING AT 3 BPM. SHUT DOWN PUMPS AND
WORKED OVER THE STUMP 3 TIMES WITH NO
ISSUES. TURNED THE PUMPS BACK ON AND
WORKED OVER THE STUMP 3 MORE TIMES WITH
NO ISSUES.
13:45 - 14:30 0.75 __
CLEAN P DECOMP PUMP 50 BBL SAFE-SURF-O SURFACE TO
SURFACE AT 8 BPM WITH 220 PSI.
14:30 - 15:30 1.00 CLEAN P DECOMP POOH FROM 1752' TO 313'.
15:30 - 17:30 2.00 CLEAN P DECOMP RACK BACK 6.75" DC'S IN DERRICK. LAYDOWN
_ DRESS OFF ASSEMBLY.
17:30 - 18:00 0.50 CLEAN P DECOMP CLEAN AND CLEAR THE RIG FLOOR.
18:00 - 19:00 1.00 CASING P TIEB1 RIG UP TO RUN 9-5/8" CASING.
19:00 - 19:30 0.50 CASING P TIE61 PJSM WITH ALL RIG HANDS AND SERVICE
HANDS.
Printed 7/1/2010 11:33:19AM
North America -ALASKA - BP Page 6 cli~-
Operation Summary Report
_---
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task i Code NPT NPT Depth Phase Description of Operations
(hr) ~ (ft)
_ _
19:30 - 23:00 3.50 CASING __
P ___ TIEB1 RIH WITH 44 JTS. OF 9-5/8" L-80 47# HYD. 563
TORQUED UP TO 15,800 FT/LBS. PICK UP AND
SLACK OFF WT. 105K.
23:00 - 23:30 0.50 CASING P TIEB1 ENGAGE THE STUMP @ 1752'. SET DOWN SOK
PICK UP TO 250K TO ENSURE GRAPPLE IS SET.
23:30 - 00:00 0.50 CASING _
P TIE61 RIG DOWN CASING TONGS AND EQUIPMENT.
6/26/2010 00:00 - 01:00 1.00 CASING P TIE61 RIG UP LONG BAILS AND CEMENT EQUIPMENT.
01:00 - 02:00 1.00 CASING P TIE61 PULL 205K ON STRING, PRESSURE TEST THE
I ~ CASING. TO 1000 PSI FOR 10 CHARTED
~ MINUTES. GOOD TEST. INFLATE ECP AT 1600
PSI AND STAGE UP TO 2000 PSI TO CLOSE.
TEST AT 2000 PSI FOR 10 MINUTES CHARTED.
GOOD TEST: BLEED TO 0 AND THEN PRESSURE
UP TO 2900 PSI`TO OPEN THE HES ES
CEMENTER. OBSERVE PRESSURE DROP TO 100
PSI'AND FEEL`SHIFTING OF PIPE WHEN ES
CEMENTER OPENED. _
02:00 - 04:30 2.50 CEMT N' FLUD TIE61 CIRCULATE @ 4 BPM WITH 120 PSI. WAITING
ON CH2MHILL TRUCKS FOR CEMENT JOB.
------
04:30 - 05:00 0.50.. ~ CEMT P TIE61 4 HOLD PJSM WITH SCHLUMBERGER,
~ HALLIBURTON, BAKER, RIG HANDS, TRUCK
j ~ PUSHER, MUD ENGINEER, TOURPUSHER, AND BP
f WSL ABOUT UPCOMING CEMENT JOB.
05:00 - 07:00 2.00 _ __
CEMT P TIE61 PUMP 5 BBLS OF 8.5 PPG SEAWATER TO FILL
THE LINES. SHUT DOWN AND PRESSURE TEST
TO 3500 PSI. GOOD TEST. PUMP 126 BBLS (605
SX) OF 15.8 CLASS G NEAT CEMENT WITH GAS
BLOK WITH A 1.17 CU.FT/SK. SHUT DOWN
DROP ES CEMENTER CLOSING PLUG. DISPLACE
AT 5.2 BPM WITH 300 PSI UNTIL PLUG IS
CAUGHT THEN PRESSURE WENT UP TO 403 ICP
~ AND 1099 FCP. CEMENT AT SURFACE WITH 106
BBLS AWAY SLOW THE PUMPS TO 2.1 BPM.
CHOKING 400 PSI BACK PRESSURE TO
SQUEEZE 10 BBLS OF CEMENT INTO THE 13-3/8"
CASING LEAK AT 4' 3"BELOW SURFACE.
~ STARTED SEEING RETURNS THROUGH THE
~ FLUTES INTO THE CELLAR WITH 8 BBLS
SQUEEZED AWAY. AT 10 BBLS SQUEEZED
OPEN UP CHOKE AND CONTINUE DISPLACING AT
2 BPM WITH 800 PSI. BUMP ES CEMENTER
CLOSING PLUG AT 12
POSITIVE INDICATION OF ES CEMENTER CLOSED
AT THE RIG FLOOR AND PRESSURE SPIKE TO
2100 PSI. BRING PRESSURE UP TO 2500 PSI
AND TEST CASING FOR 10 MINUTES CHARTED.
BLEED OFF PRESSURE AND CHECK THE
FLOATS. FLOATS HELD. TOTAL OF 10 BBLS
CEMENT SQUEEZED AWAY AND 11 BBLS OF
CEMENT AT SURFACE.
07:00 - 07:30 0.50 CEMT P DECOMP FLUSH BOP STACK AND LINES WITH CITRIC
ACID PILL.
Printed 7/1/2010 11:33:19AM
Common Well Name: J-13
Event Type: RE-ENTER- ONSHORE (RON)
Project: Prudhoe Bay
Rig Name/No.: DOYON 141
Rig Contractor: DOYON DRILLING INC.
Active Datum: J-13 @69.1ft (above Mean Sea Level
Date From - To Hrs
07:30 - 08:00 0.50
08:00 - 09:30 1.50
09:30 - 11:30 2.00
11:30 - 13:00 1.50
13:00 - 14:00 1.00
14:00 - 15:30 1.50
15:30 - 16:30 1.00
16:30 - 17:15 0.75
17:15 - 17:45 0.50
17:45 - 19:00 1.25
19:00 - 20:30 1.50
20:30 - 22:30 ( 2.00
" North America -ALASKA - BP
Operation Summary Report
Start Date: 6/20/2010 End Date:
Site: PB J Pad
Spud Date/Time:
Page 7 o1~~
AFE No
X3-OOV33-C (3,373,960.00 )
Rig Release:
UWI:
Task Code NPT NPT Depth Phase Description of Operations
(ft)
CEMT P DECOMP RIG DOWN CEMENTING LINES AND CEMENTING
HEAD.
BOPSUR P DECOMP NIPPLE DOWN 13-5/8" BOP STACK AND LIFT UP
TO SET SLIPS AND CUT CASING.
WHSUR P DECOMP INTSALL FMC 9-5/8" EMERGENCY SLIPS AND
SET WITH 100K
-,- -
WHSUR P i DECOMP PULL BELL NIPPLE AND INSTALL BOOT
PROTECTOR. SET BACK BOP STACK AND
__ ___ REMOVE TUBING SPOOL.
WHSUR P DECOMP INSTALL FMC 9-5/8" PACK-OFF AND RUN IN
LOCK DOWN SCREWS.
WHSUR P DECOMP INSTALL FMC 13-5l8", 5K,TUBING SPOOL SFRT
9-5/8" PACK-OFF TO 3,800'PSI FOR 30 MINUTES.
_ GOOD TEST.
BOPSUR P DECOMP NIPPLE UP 13-5/8'' BOP STACK, CUT 4" OFF OF
THE RISER.
BOPSUR P DECOMP BODY TEST THE BOP'S 3.5" X 6" RAMS, HCR
CHOKE, AND KILL LINE TO 250 PSI LOW / 3500
PSI HIGH FOR 5 MINUTES EACH TEST CHARTED.
GOOD TEST.
CLEAN P DECOMP' PICK UP CEMENT DRILL OUT BHA UP THE
BEAVER SLIDE.
CLEAN. P DECOMP PICK UP AND MAKE UP CEMENT DRILL OUT BHA
TO 316'.
CLEAN P_ DECOMP RIH FROM 316' TO 1688' ON 4"DRILL PIPE.
T~t;r_ED UP ON GEMENTAT 1fi88'_
CLEAN- P DECOMP TAGGED UP ON CEMENT AT 1688' AND DRILL
OUT SHOE TRACK TO 1710'. -80 RPM WITH 2K
TO
-8 BPM WITH 400 PSI. 15-20K WOB.
-UP WT. 76K /ROT WT. 77K /DOWN WT. 77K.
22:30 - 22:45 0.25 _
CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 12 BPM WITH 800
PSI WHILE ROTATING AND RECIPROCATING THE
_ PIPE.
22:45 - 00:00 1.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE WITH 4"
DRILLPIPE FROM 1728' TO 3137'.
6/27/2010 00:00 - 05:15 5.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE FROM 3137'
TO 9627'. WASHED DOWN FROM 9627' TO
9631'. TAGGED EZSV AT 9631'. PUMPED AT 3
~ _ BPM WITH 150 PSI.
05:15 - 07:00 1.75 ~ CLEAN P _ DECOMP CIRCULATE A HI-VIS SWEEP SURFACE TO
~, SURFACE. PUMP AT 380 GPM WITH 1,200 PSI
07:00 - 11:30 -
4.50 I _
CLEAN P DECOMP POOH STANDING BACK 4" XT-39 DRILLPIPE IN
~ DERRICK FROM 9,631' TO 225'. MAINTAIN
CONTINIOUS HOLEFILL. HOLE TOOK CORRECT
VOLUME
11:30 - 13:00 1.50 CLEAN P DECOMP STAND BACK 6-3/4" DRILL COLLARS. BREAK
OUT AND L/D BHA.
13:00 - 13:30 0.50 CLEAN _
P DECOMP CLEAR AND CLEAN RIG FLOOR.
13:30 - 14:30 1.00 CLEAN P DECOMP CLOSE BLIND/SHEAR RAMS AND TEST 9-5/8"
CASING TO 3 500 PSI FOR 30 MINUTES ON THE
CHART. GOOD TEST
Printed 7/1/2010 11:33:19AM
r~
•
North America -ALASKA - BP Page ~ ate'
Operation Summary Report
Common Well Name: J-13 i AFE No
Event Type: RE-ENTER- ONSHORE (RON) i Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
14:30 - 15:00 0.50 WHSUR P DECOMP M/U FMC RUNNING TOOL AND PULL WEAR
BUSHING.
1 - _
15:00 - 19:45 4.75 BOPSUR P DECOMP R/U TEST ASSEMBLIES, FILL BOP STACK WITH
WATER AND PURGE AIR FROM SYSTEM.TEST
BOPE TO 250 PSI LOW AND 3,500 PSI HIGH.
HOLD EACH TEST FOR 5 MINUTES ON THE
CHART. TEST ANNULAR WITH 4" AND 4-1/2"
TEST JOINTS. TEST UPPER 3-1/2" X 6" RAMS
~ i WITH 4 AND 4-1/2" TEST JOINT AND LOWER
2-7/8" X 5"VBRS WITH 4" AND 4-1/2" TEST
JOINTS:
TEST UPPER 3-1/2"X 6"VBRS, LOWER 2-7/8" X
5" VBRS, BLIND SHEAR, ANNULAR, CHOKE
MANIFOLD,VALVES, MANUAL KILL AND CHOKE
LINE VALVES, HCR KILL AND CHOKE LINE
VALVES, FLOOR_VALVES, UPPER AND LOWER
IBOP VALVES ON TOP DRIVE.
-PERFORM ACCUMLATORTEST.
- AOGCC WAIVED WITNESS OF TEST BY BOB
NOBLE.
- -.TEST WAS WITNESSED BY BP WSIS BILL
BURSON AND CHRIS KOBUCK AND DOYON
TOOLPUSHERS CHARLIE HUNTINGTON AND ERIC
RODLAND.
-TESTED H2S AND LEL ALARMS.
____
19:45 - 20:15 0.50 BOPSUR P DECOMP INSTALL THE WEAR RING.
20:15 - 20:30 0.25 BOPSUR P DECOMP AAR ON BOP TESTING WITH RIG CREW.
20:30 - 22:30 2.00 STWHIP P WEXIT PICK UP AND MAKE UP WHIPSTOCK BHA.
22:30 - 23:00 0.50 STWHIP P WEXIT RIH TO 471'.
23:00 - 00:00 1.00 STWHIP N DEAL WEXIT SHALLOW TEST MWD WITH 450 GPM AND
500-800 PSI. MWD TOOL FAILURE.
6/28/2010 _
11:00 - 12:00 ___
1.00 STWHIP _
P ___ WEXIT M/U TOP DRIVE AND ORIENT WHIP STOCK, P/U
WEIGHT 210K, S/O WEIGHT 125K, 500 GPM WITH
2,400 PSI. ORIENT WHIPSTOCK TO 64 DEGREE.
SET DOWN ON TOP OF EZSV AT 9,631', SET
DOWN 25K WEIGHT AND THEN P/U 35K OVER.
SHEAR PIN IN WHIPSTOCK, HAD TO WORK PIN
I TO SHEAR IT. SHEARED WITH 58K DOWN.
_-~ _ _ t
00:00 - 03:00 I 3.00 STWHIP N DFAL WEXIT TROUBLE SHOOT MWD ISSUES. DIRECTIONAL
~ PULSER NOT BEING DETECTED. CHANGED OUT
I ENTIRE TOOL AND SHALLOW TESTED AGAIN.
TOOL PASSED SHALLOW TEST.
03:00 - 11:00 8.00 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA ON STANDS OF 4"
DRILL PIPE TO 9,593'
12:00 - 14:00 2.00 STWHIP P WEXIT PJSM WITH ALL PERSONNEL. DISPLACE WELL
FROM SEAWATER TO 10.5 PPG LSND AT 380
GPM WITH 2,200 PSI.
-ESTABLISH SLOW PUMP RATES
-MUD PUMP #1 30 SPM AT 550 PSI
-MUD PUMP #2 30 SPM AT 590 PSI
MUD WT. IN AND OUT 10.5 PPG
~oP
~3P~
Printed 7/1/2010 ~11:33:19AM
J'~3A
r1
North America -ALASKA - BP Page 9 ofd.
Operation Summary Report
Common Well Name: J-13 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/20/2010 End Date: X3-OOV33-C (3,373,960.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig Name/No.: DOYON 141 Spud Date/Time: Rig Release:
Rig Contractor: DOYON DRILLING INC. UWI:
Active Datum: J-13 @69.1ft (above Mean Sea Level)
Date ! From - To Hrs Task Code ! NPT NPT Depth i Phase Description of Operations
(hr) (ft)
14:00 - 00:00 10.00 STWHIP P WEXIT MILL WINDOW FROM 9 609' TO 9626'. 80 RPM
WITH 5K TO. ROT WT. 150 K PUMPING AT 12
BPM WITH 3250 PSI. TOP OF WINDOW AT 9609'
AND BOTTOM OF WINDOW AT 9626'. MILL
AHEAD IN FORMATION TO 9640'.
__
6/29/2010 __
03:15 - 07:00 3.75 STWHIP P WEXIT PULL 5 STANDS AND FLOW CHECK. WELL
STATIC. PUMP DRY JOB AND POOH RACKING
BACK 4" DRILLPIPE.
CALCULATED HOLE FILL 52.4 BBLS, ACTUAL
HOLE FILL 55.5 BBLS
00:00 - 00:30 0.50 ____
STWHIP P WEXIT CONTINUE TO MILL FROM 9640' TO 9651'.
-10 BPM WITH'2300 PSI
j - 100 RPM WITH SK TO, 20 25K WOB
_
00:30 - 02:00 _
1.50 STWHIP P i WEXIT CIRCUU~TE AND RECIPROCATE THROUGH THE
WINDOW WHILE PUMPING AT 12 BPM WITH 2300
PSL PUMP 35,BBL HI-VIS SWEEP FOLLOWED BY
! ~ 880 BBLS. SAW MINIMAL AMOUNTS OF METAL
SHAVINGS COME ACROSS THE SHAKERS.
TOTAL OF APPROX. 226 LBS OF METAL
- CUTTING BACK TO SURFACE DURING MILLING
OPERATIONS AND CIRCULATION. TURN OFF
THE PUMPS AND WORK THROUGH THE WINDOW
3 TIMES WITH NO DRAG SEEN.
02:00 - 02:15 0.25 j STWHIP P _ WEXIT PULL UP INTO THE SHOE AND ESTABLISH SPR'S
AT 9607.
- PUMP #1: 15 SPM WITH 420 PSI AND 20 SPM
WITH 440 PSI.
-PUMP #2: 15 SPM WITH 410 PSI AND 20 SPM
WITH 440 PSI.
MUD WT IN AND OUT 10.5 PPG
__ 02:15 - 02:30 0.25 STWHIP _
P WEXIT RIG UP TO PERFORM F.I.T. TO 12.5 EMW.
02:30 - 03:00 0.50 STWHIP P WEXIT PERFORM F.I.T. TO 12.5 EMW. 10.5 PPG MUD IN
THE HOLE AND 810 PSI SURFACE PRESSURE.
HELD FOR 10 MINUTES AND 0-PSI BLED OFF
DURING TEST.
_ 03:00 - 03:15 0.25 _
STWHIP P WEXIT RIG DOWN AND PREPARE TO POOH.
07:00 - 10:00 3.00 STWHIP P WEXIT MONITOR WELL AT BHA, WELL STATIC.
-L/D DRILL COLLARS AND MWD TOOL
-UD MILL ASSEMBLY, STARTER MILL WAS 1/4"
UNDER GAUGE, LOWER AND UPPER STRING
MILLS WERE IN GAUGE.
10:00 - 10:30 0.50 ~ _
STWHIP P WEXIT CLEAR WHIPSTOCK MILLING BHA FROM RIG
FLOOR.
10:30 - 12:00 1.50 STWHIP P WEXIT PULL WEAR BUSHING, M/U STACK WASHING
TOOL AND FLUSH BOP STACK AND WELLHEAD,
-CLEAN OUT FROM UNDERNEATH SHAKERS
AND CLEAN POSSUM BELLY.
__ 12:00 - 12:30 0.50 ___
STWHIP P I _
WEXIT INSTALL WEAR BUSHING.
Printed 7/1/2010 11:33:19AM
TRFE `- 6" CAMERON
WELLHEAD = FMC
ACTUATOR = 6" OTIS
KB. ELEV = _..._ _
69.07'
BF. ELEV - 41.87
KOP = 2300'
Max Angle = 61° @ 8598'
Datum MD = 11043'
Datum TV D = 8800' SS
_~,'.,
J -13A
9-5/8" CSG PATCH, 47#, HYD563, ID = 8.681"
13-3/8" CSG, 72#, L-80, ID = 12.347"
I 1754' 1
Minimum ID = 3.725" @ 10615'
4-1 /2 XN NIPPLE
SAFETY NOT HROME TBG &LNR
1708' ~ HES CEMENTER
2190' 4-1/2" X NIP, 9CR, ID = 3.813"
260 9-5/8" DV PKR
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3957 3705 44 MMG DCK RKP 0 07/09/10
3 6849 5891 42 MMG DMY RK 0 07/09/10
2 9164 7417 47 MMG DMY RK 0 07/09/10
1 10445 8339 42 KBG-2 DMY BK 0 07/09/10
9463' ~ 9-5/8"x7" ZXPN LTP w /RS PROFILE ID = 6.19"
9479' 9-5/8"x7" BKR HMC LNR HGR, ID = 6.18"
9-5/8" CSG MILLOUT WINDOW (J-13A): 9609' -'
9-5/8" CSG, 47#, N-80, ID = 8.681"
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOP PERF: ° @ '
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
4-1/2" TBG, 12.6#, 13CR80, ..0152 bpf, ID = 3.958"
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184"
I 10771' I
PBTD
4-1/2" LNR, 12.6#, 13CR80, ..0152 bpf, ID = 3.958"
-14-1 /2" HES X NIP, ID = 3.813"
09' 7" x 4-1/2" HES TNT 13CR PKR,
ID = 3.856"
10544' 4-1/2" HES X NIP, ID = 3.813"
10615' 4-1/2" HES XN NIP, ID = 3.725"
10620' 7"x4-1/2" HRD-E ZXPN LTP
w /GS PROFILE, ID = 4.18"
10637' 7"x4-1/2" BKR FLIX
LOCK LNR HGR, ID = 4.34'
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/80 ORIGINAL COMPLETION
07/10/10 D141 SIDETRACK (J-13A)
07/15/10 SV DRLG HO CORRECTIONS
PRUDHOE BAY UNff
WELL: J-13A
PERMff No: 2100510
API No: 50-029-20497-01
SEC 9, T11 N, R13E
BP F~cploration (Alaska)
os/3ato
$ChlUlilbBl'~~I'
Alaska Data & Consulting Services
2525 Gambell Street, Suke 400
Anchorage, AK 99503-2938
ATTN: Beth
Well Job #
N0.5553
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Log Description Date BL Calor CD
J-13
K-O66
PWDW3-1 6148-00109
BCUE-00027
BCRC-00027 USIT
MEM PROD PROFILE ~_ ~
RST WFL .> ~1'` /` ~ 06/23/10
06/14/10
06/22/10
/
1 1 1
1
1
1-11/SN-04 8148-00107 LDL ~ - 06/12/10 1 1
3-01/N-29 BD88-00021 MEM INJ. R FILE 06/13/10 1 1
15-168
15-166PB1 10AKA0047
t0AKA0047 OH MWDlLWD EDIT
OH MWD/LWD EDIT 04/04/10
04/01/10 2
2 1
1
03-22 BSJN•00047 RST .- 03/30/10 1 1
G-30C AZ2F-00038 MCNL 04/22/10 1 1
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
~~
Alaska Data 8 Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
. TSB ~' ^ ~!;
~.~~.1~~
~` ,j
~` ,...
~ A Q
-
J-13A Change in Verbiage • • Page 1 of 2
Schwartz, Guy L (DOA)
From: Schwartz, Guy L (DOA)
Sent: Thursday, June 03, 2010 3:59 PM
To: 'Thompson, Jacob'
Cc: DOA AOGCC Prudhoe Bay
~.~..
Subject: RE: J-13A (PTD 210-051 and PTD 1r 'BOP variences for Sidetrack well.
Jacob,
The delay in LPRs' testing is approved ... you have it actually inserted after Step 7, I believe you want it right
after step 5 (pulling the 7" tubing) .
Regarding the request to forego C/O to 9 5/8" BOP rams... your argument to not swap rams has merit. With a
shallow 13 3/8" surface casing leak the rams become essentially diverters. You will have two tested barriers
down-hole to isolate from the reservoir already. 1) Cement plug over perfs that is pressure tested... 2) 9 5/8"
EZSV at 9640' and which will be tested to 3500 psi
I will replace the page 8 and 9 (Operations Summary) of the wellplan with the version attached.
Regards,
~; ~Rr
a~ `~~
Guy Schwartz
Senior Petroleum Engineer
AOGCC
793-1226 {office)
444-3433 (cell)
From: Thompson, Jacob [mailto:Jacob.Thompson@BP.com]
Sent: Thursday, June 03, 2010 7:44 AM
To: Schwartz, Guy L (DOA)
Cc: Egbejimba, Uchenna J
Subject: J-13A Change in Verbiage
Guy,
Could you please approve of the change in verbiage to step 5 of the operational summary for J-13A. (requesting
delayed testing of the LPRs) Atso we do not plan on changing out to 9-518" rams prior to pulling our 9-5/8" CSG,
so step 11 will not be done. This step is eliminated because there is a surface CSG leak in the 13-3/8" 4'-3" from
surface. There are two tested barriers in the well at this time and the rams don't buy us any assurance because a
well control incident would leak out of the surface CSG. Please give me a call if you have any question.
«J-13A Draft Permit to drill Revision.doc»
Jacob Thompson
6/3/2010
J-13A Change in Verbiage
GPB Rotory Drilling
Cell: (907J 8544377
Dice: (907J 5645579
Page 2 of 2
6/3/20 i 0
u
Greg Hobbs
Engineering Team Leader 2
BP Exploration (Alaska), Inc. ~~~~~'`-='- ~Pti ~ ~ ~~)~~
P.O. Box 196612 ~b
Anchoragc, AK 99519-GG 12 ~'
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-13
Sundry Number: 310-106
Dear Mr. Hobbs:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
rehearing. A request for rehearing is considered timely if it is received by 4:30
PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend. A person may not appeal a
Commission decision to Superior Court unless rehearing has been requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
D~
DATED this ~ day of April, 2010.
Encl.
(~ ~ STATE OF ALASKA
~~a~ ALASK~L AND GAS CONSERVATION COMMIS~I
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
RECEIVE,
APR 0 7 2010~pp
1. Type of Request:
~
^ Abandon ®Plug for Redrill ' ^ Perforate New Pool ^ Repair Well ^ Change Appro
~
~+
^ Suspend ^ Plug Perforations ^ Perforate ^ ull Tubing ^ Time Extension
^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate L10 Alter Casing ^ Other
H.
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 180-083
3. Address: ^ Service ^ Stratigraphic 6. API Number.
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20497-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU .1-13
Spacing Exception Required? ^ Yes ®NO
9. Property Designation: 10. Field !Pool(s):
ADL 028281 - Prudhoe Bay Field / Prudhoe Bay Oil Pool
11- PRESENT'WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11800' - 9447'- 11669' 9332' 10300' 11600'
Casin Len Size MD ND Burst Golla
Structural
Conductor 1 11 1
Surface 267 ' 1 - / " 67 ' 2 4 70
Intermediate 107 0' - / " 1 78 ' 9 ' 870 7
Production
Liner 1531' 7" 10 ' - 117 8 4' - 44 ' 7 2
Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
11283' - 11308' 9000' - 9021' 7", 26# x 4-1/2", 12.6# L-80 10333'
Packers and SSSV Type: 9-5/8" x 7" Guib. Polar Packer Packers and SSSV 10226' / 8176'
MD (ft) and ND (ft):
12. Attachments: 13. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory Development ^ Service
^ Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: April 20, 2010 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned
16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ~ 1 Plugged ^ SPLUG
Commission Representative: SL/S~ /
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Jacob Thom son 564-5579
Printed Name Greg Ho r' Title Engineering Team Leader
Prepared ey Name/Number:
Signature Phone 564-4191 Date ®~ Terrie Hubble, 564-4628
Commission Uss Onl
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 ~ O " / O ~J
^ Plug Integrity Ia'AOP Test ^ Mechanical Integrity Test ^ Location Clearance
~ 3soo ps` BoP Ts ~
_
Other: L
,o SL Ahrt u. f'4r Q$ T ~+~
~ZSf~a
/
Subsequent Form Required: 1 ~ . 4/ Q
APPROVED BY ~ / t~
~
Approved By: COMMISSIONER THE COMMISSION Date
`
Form 10-403~Rev~s~d i~2/2009
~o~us a~ o~ Boa R I G ~ ~ A L ~~ ~'.~,o
/~~ t/~~ a
Submit In Duplicate
J-13
Well Type: Producer
Current Status: The well is currently shut-in.
MIT - IA Passed to 3000 psi 11/06/09
MIT - OA Failed 03/21/10
•
Request: Approval is requested for the P&A of PBU well J-13. J-13 has a surface casing leak at 4'3",
classifying it as a "Not Operable". Additionally, past wellwork has likely damaged the perforation interval
rendering it non productive. The well is completed with 7" tubing and has no gas lift mandrels for kicking
off purposes. Without GLV's we are unable to kick off and sustain flow thru the 7" tubing.
13
Scope of Work: The sidetrack plan for(an Ivishak Z2 producer) includes the following during pre-
rig operations: laying cement across the perforations, cutting the 7" tubing 200' below the planned
whipstock exit. The exit will be from the 9-5/8" casing at approximately 9596' with an 8.5" milling
assembly. The 8.5" hole will be drilled from to the top of the Sag River where a 7" will be run to 150'
inside the 9-5/8" casing. The 7" liner will be fully cemented. The production hole will be drilled with a 6"
BHA. The well will run through the Ivishak formation. The production liner will be 4-1/2" L-80 and fully
cemented. Tubing will be 4-1/2" 13Cr, tied into the top of the production liner.
MASP: 2403 psi i
Estimated Start Date: 04/20/2010 ~ y ~, iv
Drilling Engineer: Jacob Thompson, 564-5579
•
J-13A
Operations Summary
Pre-Riq Operations:
1. F Pressure Test (to verify Abandonment 8< Barriers)
Note: 13-3/8" surface casing has a leak 4' 3" from surface
MIT-IA to 3,000psi Passed
11 /6/2009
MIT-T tp 3000 psi Passed
5/20/2009
PPPOT-T to S,000psi
PPPOT-IC to 5,000psi
Function test casing and tubing LDS. Back out to ensure full movement as the 9
5/8" will be cut and pulled
2. S Pull SSSV
3. S Pull 2-7/8" PXN plug & nipple reducer @ 10300, Drift Tubing to 10300'
RU Coil Unit, RIH and Tag PBTD (Fish @ ~966~. Begin laying in 15.8 Class G cement
1 for 1 !/,G~o'
1267' of 7" 29# w/ capacity of .0371 bbls/ft = 47.1 bbls of cement ~
5. C 107' of 4-1/2" w/ capacity of .0152 = 1.6 bbls of cement ~
20' of 7" 26#w/ capacity of .0383 = 5.6 bbls of cement ~
Desired Top of cement 10080' w/ BOC of-~96~6L; a total of 54.3 bbls pumped.
6. S Drift tubing, tag TOC ~~~ ~ °O
7. F Pressure Test Tubing to 3500 psi
8. E RIH and jet cut tubing @9800'
9. O Circulate the well to seawater. Freeze-protect the IA and tubing with diesel to 2,200'.
10. O Bleed all pressures to zero. Set BPV. Secure well.
11. O Remove the well house. If necessary, level the pad. Install impermeable cellar liner
Riq Operations:
1. MI / RU rig
2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater.
3. Set and test TWC to 1,000 psi from above and below.
4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull
TWC.
5. R/U & pull 7" tubing from the cut depth at 9800' MD.
6. R/U & Run 9-5/8" casing scraper to 9750'
7. RU E-line and RIH w USIT (in corrosion mode)/CCL to 9800' and log to surface to determine TOC.
8. RIH with HES EZSV bridge plug on E-line and set at 9640' MD, as required to avoid cutting a casing .
collar while milling the window. Test CSG to 3,500 psi. POOH.
9. RIH w/ 9-5/8" Tubing Punch. Punch holes above stage collar at 2603'and test for circulation. TOC '
estimated at 2200'.
10. MU a Baker 9 $/8" multi-string cutting assembly. RIH picking up DP to planned cut depth above the DV
PKR and below the TBG punch. Cut the 9 5/e" casing per Baker representative instructions and as
determined from USIT log. Spot a pill of hot diesel for 30-60 minutes at cut, then pump 40 bbl of
Safe-Surf-O mixed in fresh water, followed by heated brine (2.5 volumes) to remove Arctic Pack.
POOH, L/D assembly.
11. Change out to 9 5/8" rams, and test rams.
12. BOLDS, RU/MU casing spear assembly, and unseat the 9 5/s'. Circulate the annulus. Pull the 9 5/s"
casing from the cut.
13. RIH, clean-out the 13'/8" casing, and the 9 5/8" casing stub, dress off the 9 g/a" casing stub for easier
access throughout the intermediate section.
14. Run new gas-tight 9-5/8" 47# TCII w/patch, ECP, and ES-cementer, land patch, pull 100K over string
wt and maintain, inflate & close ECP, open cementer and pump OA full of latex cement. Once the
cement at surface, SI returns and squeeze cement thru SC leak and into lined cellar until plenty of
clean cement returned into cellar
15. Split stack below tubing spool, install emergency slips and primary pack-off, slack off the 100K
hanging wt, Wachs cut the 9-5/8"
16. NU new tubing spool w/secondary pack-off, test pack-offs, test all breaks
17. WOC. Drill out ES Cementer and cleanout to cement retainer. PT casing and POH.
18. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. '
19. P/U and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whipstock and set on
EZSV bridge plug. Shear off of whip stock.
20. Displace the well to +/-10 ppg LSND based milling fluid. Completely displace the well prior to
3!0 ~ 1 UG
21. Mill window in 9 5/e' casing plus approximately 20' beyond middle of window. Circulate well bore
clean.
22. Pull up into 9 5/e" casing and perform LOT. POOH.
23. M/U 8-'/2" GR/RES/PWD/MWD assembly. RIH, kick off and drill the 8-%2° intermediate section with
LSND drilling fluid.
24. Drill ahead to the 7" csg point at top of the Sag River, as per the directional plan. Casing point is
estimated at 10763'. Circulate the well clean, short trip as needed. POH.
25. MU and run 7", 29#, L-80, intermediate liner. Circulate and condition the hole.
26. Cement the entire 7" liner. Test floats on bump. ~
27. Test the liner and 9-5/8" casing to 3,500 psi for 30 charted minutes.
28. M/U the first 6-%a' Dir/GR/Res/Neu/Den assembly with an insert bit. Pick Up DP as necessary.
29. RIH, Drill out of cement and 7" liner float equipment.
30. Displace to 8.4 ppg Flo Pro Fluid.
31. Continue drilling out the 7" shoe plus ~20' new formation, pull up into the shoe and perform a FIT.
32. Drill the 6-'/8' production interval as per directional plan to estimated TD of 11541'.
33. POOH. UD BHA.
34. MU and RIH to bottom with 4 '/", 12.6#, 13Cr liner. This will include 150' liner lap inside the 7" Casing
35. Cement the liner.
36. Set liner top packer and displace well to clean seawater above the liner top. A pert pill will be left in
the 4-'/2" liner.
37. POOH, L/D LRT.
38. Pressure test casing and liner to 3,500 psi for 30 minutes. "'~
39. R/U and run a 4-'/2", 12.6#, 13Cr, VamTop tubing completion, stinging into the 4-'/" liner tie back
sleeve.
40. Space out and make up tubing hanger per FMC Rep.
41. Land the tubing hanger, and run in lock down screws.
42. Circulate Corrosion Inhibitor.
43. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30
minutes. Record each test.
44. Shear Circulating Valve
45. Set a TWC and test to 1,000 psi from below and above to 4000 psi. ,
46. Nipple down1 the BOPE. Nipple up the tree and test to 5,000 psi.
47. Pull TWC. Freeze protect the well to 2,200' TVD. Set BPV and Secure the well.
48. RD and Move Off.
Post-Rip Operations:
1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer.
2. Replace the DCK shear valve with a dummy GLV.
3. Install well house and instrumentation.
4. Modify S- Riser As Needed
5. Perforate well
~ i F.,'
TREE= 8" CAMERON
WELLHEAD= FMC
ACTUATOR = 6" OTIS
KB. ELEV - 69.07
BF. ELEV - 41.87
KOP = 2300'
Max Angle = 61 @ 8600'
Datum MD = 11105'
Datum TV D = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347"
Minimum ID = 2.313" @ 10300'
2-7/8" XN NIPPLE REDUCER
7" TBG, 26#, L-80, .0383 bpf, ID = 6.276"
TOP OF 7" LNR
J-13 ~'
V
4-1/2" OTIS X NIP, ID = 3.813"
10300' -14-1/2" OTIS XN NIP, ID = 3.725"
~4-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" I
9-5/8" CSG, 47#, N-80, ID = 8.681"
PERFORATION SUMMARY
REF LOG: BHCS ON 09/28/80
ANGLE AT TOP PERF: 32° @ 11283'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-1/8" 4 11146 - 11168 S 03/26/81
3-1/8" 4 11178 - 11198 S 03/26/81
3-1/8" 4 11208 - 11238 S 05/02/81
3-1/8" 4 11248 - 11278 S 05/02/81
2-7/8" 6 11283-11293 O 02/22/09
3-1/2" 6 11293 - 11308 O 04/08/08
2-7/8" 6 11293 - 11308 O 09/02/07
3-3/8" 4 11293 - 11310 S 08/18/07
PBTD
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184"
2077' ~-~7" OTIS RPB SSSV LANDING NIP, ID=5.963"
9-5/8" DV PKR
10080' I-'iTOC (PKR SOZ 09/28/04) I
)193'-10198' TBG PUNCH (09/21/04)
10203' TOP OF PBR
10226' 9-5/8" X 7" GUIB. POLAR PKR
10226' 7" X 4-1/2" XO, ID = 3.958"
10300' 4-1/2" X 2-7/8" NIP REDUCER, ID = 2.313"
10300' 2-7/8" PXN PLUG (05/20/09)
10333' 4-1/2" TUBING TAIL, ID = 3.958"
10340' ELMD TT LOGGED 10/06/91
11047' ~~ MARKER JOINT
11600' CTM ~ FISH - HES FASDRILL MILLED &
PUSHED TO BOTTOM (10/07/04)
11646' FISH- 27' PERF GUN (03/26/81)
11669' TOP OF CEMENT (08/18/07)
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/80 ORIGINAL COMPLETION 08/18/07 MCZ/PJC CMTSOZ
07/18/01 RNITP CORRECTIONS 09/03/07 TEL/PJC PERFORATION
11/01/01 WB/TP SURFLOCCORRECTION 04/18/08 RMITLH RE-PERF
08/04/04 MDC/TLP IBP, FISH NECK 03/03/09 MV/SV ADPERF (02/22/09)
10/18/04 DBM/TLH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET NIP RED w /PXN PLUG (05/2
05/29/06 CO/DTM PERF CORRECTIONS (6/13/04)
PRUDHOE BAY UNff
WELL: J-13
PERMIT No: 1800830
API No: 50-029-20497-00
SEC 9, T11N, R13E
BP Exploration (Alaska)
TREE = 6" CAMERON
WELLHEAD = FMC
ACTUATOR = 6" OT1S
KB.,ELEV = 69.07'
BF. ELEV = 41.8T
KOP= 2300'
Max Angle = 61 @ 8600'
Datum MD = 11105'
Datum TVD = 8800' SS
J-1i PRE-RIG
2077' ~~ 7" OTIS RPB SSSV LANDING NIP, ID=5.963"
2603' I~ 9-5/8" DV PKR
13-3/8" CSG, 72#, L-80, ID = 12.347" 11 2670,
9800' TBG CuT -
Minimum ID = 2.313" @ 10300'
2-7/8" XN NIPPLE REDUCER
7" TBG, 26#, L-80, .0383 bpf, ID = 6.276"
TOP OF 7" LNR
I4-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" I
9-5/8" CSG, 47#, N-80, ID = 8.681"
PERFORATION SUMMARY
REF LOG: BHCS ON 09/28/80
ANGLE AT TOP PERF: 32° @ 11283'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-118" 4 11146 - 11168 S 03/26/81
3-1/8" 4 11178 - 11198 S 03/26/81
3-118" 4 11208 - 11238 S 05/02/81
3-1/8" 4 11248 - 11278 S 05/02/81
2-718" 6 11283 - 11293 O 02/22109
3-1/2" 6 11293 - 11308 O 04/08/08
2-7/8" 6 11293 - 11308 O 09/02/07
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184"
10300' --~ 4-1 /2" OTIS XN NIP, ID = 3.725"
0080' -I TOC ~
0080' TOC (PKR SOZ 09/28/04)
193'-10198' TBG PUNCH (09/21/04)
0203' TOP OF PBR
i 10300' I-I4-1/2" X 2-7/8" NIP REDUCER, ID = 2.313"
10300' PULL 2-7/s° PXN PLUG
10333' 4-1/2" TUBING TAIL, ID = 3.958"
10340' ELMD TT LOGGED 10/06/91
10269' I-I 4-1 /2" OTIS X NIP, ID = 3.813"
MA RKER JOINT
11600' CTM FISH - HES FASDRILL MILL® &
~
~
PUSHED TO BOTTOM (10107/04)
11646' FISH- 27' PERF GUN (03/26!81)
11669' TOP OF CEMENT (08/18/07)
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/80 ORIGINAL COMPLETION 08/18/07 MCZ/PJC CMTSOZ
07/18/01 RN/TP CORRECTIONS 09/03/07 TEUPJC PERFORATION
11/01/01 WBlTP SURF LOC CORRECTION 04!18/08 RMITLH REP82F
08/04104 MDCIfLP IBP, FISH NECK 03/03/09 MV/SV ADP~2F (02/22/09)
10!16104 DBMITLH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET NIP RED w /PXN PLUG (05/2
05!29/06 CO/DTM PERF CORRECTIONS (6/13/04)
PRUDHOE BAY UNff
WE1L: J-13
PERMff No: 1800830
API No: 50-029-20497-00
SEC 9, T11 N, R13E
BP Exploration (Alaska)
0226' I~ 7" X 4-1 /2" XO, ID = 3.958"
0226' I---I 9-5/8" X 7" GUIB. POLAR PKR
TREE= 6 CAMERON
Wf1LHEAD,= FMC
_
ACTUATOR = .,..
6" OTIS
KB. aEV = 69.07'
BF. ELEV = 41.87
KOP = 2300'
Max Angle = 61 ~ 8600'
Datum MD = 11105'
Datum TVD = 8800' SS
~ J-13A S''~
' Proposed Draft
2100' 4-112" X N~, ID = 3.813"
2503' 9-5/8" DV PKR
13-3/8" CSG, 72~, L-80, ~ =12.34T 2670'
ST MD TVD DEV TYPE VLV LATCH
5 TBD TBD 4.5" x 1.5"
4 TBD TBD 4.5" x 1.5"
3 T8D TBD 4.5" x 1.5"
2 TBD TBD 4.5" x 1.5"
1 TBD TBD 4.5" x 1.5'
~.
9-5/8" CSG, 476, N-80
9800' -.~~
T TBG, 266, L-80 Cut
T LNR, 296, L-80, .0371 bpf, ~ = 6.184°
TOP OF T LNR 9450'-~
10513'
10543'
10573'
10993'
10673' 1076
TOP OF 41/2" LNR
4-1 i2" OTIS X , ID = 3.813"
4-1/2" 41 /2" X T Packer
41 /2" OTIS X, ~ = 3.813"
4-1 /2" OTIS XN O = 3.725'
3~ T 29" I-80 BTC Liner
11541'
41/2" 12.6# 13Cr VamTop Liner
PRUDHOE BAY UNfT
WELL: J-13
PERMtT No: 1800830
API No: 50-029-20497-00
SEC 9, T11 N, R13E
GATE REV BY CONN~(TS DATE REV BY COMMENTS
69/80 ORIGINAL COM PLETK)N 08/187 MCZ/P.K; CMT SOZ
07/18/01 RN/TP CORRECTIONS 09/03/07 T~/PJC P92FORATION
11m1/Ot WB/TP SURF LOC CORRECTION 04/18/08 RM/TLH RE-PH2F
08/04/04 MDC/TLP ~P, F1SH NECK 03103!09 MV/SV ADPERF (02P12~9)
10/16/44 DBMI7LH FASDRILL PLUG/TBG PUNCH 05/29/09 ?/PJC SET 1~ REDw/ PXN PLUG (0512
05/29/06 CO/DTM PERF CORRECTbNS (6/13/04) 11/18/09 DJ Proposed Sidetrack
D/09)
BP 6[pbration (Alaska)
I~
STATE OF ALASKA ~~~~
` ALAS~OIL AND GAS CONSERVATION COMMON
` REPORT OF SUNDRY WELL OPERATIONS ~,,
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Other
Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Tit~Extensio
^
.r-;
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ ~ Re-enter Suspesr~ ell
2. Operator BP Exploration (Alaska), inc. 4. Current Well Class: 5. Permit to Dnl ~ber: ' > ~~
Name: Development ~ Exploratory A '~~~ ~ ,
3. Address: P.O. Box 196612
Anchora
e
AK 99519-6612 Stratigraphic ~ Service ~ 6. API Number: /~~ ~U~~`
S
g
, 50-029-20497-00-00-
S7~
7. KB Elevation (ft): 9. Well Name and Number:
69.1 KB - PBU J-13.
8. Property Designation: 10. Field/Pool(s):
ADLO-028281 - PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 11800 - feet Plugs (measured) None
true vertical 9465 - feet Junk (measured) 11646
~s;.~
Effective Depth measured 11749 feet ' ' ~ ~~~' ~~~r~ ~~t r'
~U~~~
true vertical 9419 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470
Production 10754 9-5/8" 47# N-80 26 - 10780 26 - 8607.7 6870 4760
Liner 1530 7" 29# L-80 10265 - 11795 8220 - 9461 8160 7020
Surface 2641 13-3/8" 72# L-80 29 - 2670 29 - 2653 4930 2670
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 10226 - 10333
7" 26# L-80 SURFACE - 10226
Packers and SSSV (type and measured depth) 9-5/8" DV Packer 2603
7" Guiberson Polar Packer 10226
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: si
Subsequent to operation:
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ~' - Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ~ Gas WAG GINJ ~ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Prebl Title Data Management Engineer
Signature Phone 564-4944 Date 2/24/2009
Form 10-404 Revi ed 04/2006 %~ .R '~, MQ~ ~ ~ ~7Q~ ~~( Submit Original Only
~~
J-13
180-083
PERF ATTACHMENT
•
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd De th Base
J-13 3/26181 PER 11,146. 11,168. 8,885.47 8,903.72
J-13 3/26181 PER 11,178. 11,198. 8,912.01 8,928.65
J-13 3/26/81 PER 11,208. 11,238. 8,936.99 8,962.09
J-13 3126181 PER 11,248. 11,278. 8,970.48 8,995.7
J-13 4/20/81 RPF 11,146. 11,168. 8,885.47 8,903.72
J-13 4/20/81 RPF 11,178. 11,198. 8,912.01 8,928.65
J-13 4120/81 RPF 11,208. 11,238. 8,936.99 8,962.09
J-13 4120181 RPF 11,248. 11,278. 8,970.48 8,995.7
J-13 512181 RPF 11,146. 11,168. 8,885.47 8,903.72
J-13 5/2/81 RPF 11,178. 11,198. 8,912.01 8,928.65
J-13 5/2/81 RPF 11,208. 11,238. 8,936.99 8,962.09
J-13 5/2/81 RPF 11,248. 11,278. 8,970.48 8,995.7
J-13 12/30/88 SQZ 11,146. 11,168. 8,885.47 8,903.72
J-13 12/30/88 SQZ 11,178. 11,198. 8,912.01 8,928.65
J-13 12/30/88 SQZ 11,208. 11,238. 8,936.99 8,962.09
J-13 12130188 SQZ 11,248. 11,278. 8,970.48 8,995.7
J-13 1116189 APF 11,293. 11,310. 9,008.36 9,022.76
J-13 8118/90 SQZ 11,146. 11,168. 8,885.47 8,903.72
J-13 8/18/90 SQZ 11,178. 11,198. 8,912.01 8,928.65
J-13 8/18/90 SQZ 11,208. 11,238. 8,936.99 8,962.09
J-13 8/18/90 SQZ 11,248. 11,278. 8,970.48 8,995.7
J-13 8/18/90 SQZ 11,293. 11,310. 9,008.36 9,022.76
J-13 8/23/90 RPF 11,293. 11,310. 9,008.36 9,022.76
J-13 8/17/07 SQZ 1. 11,310. 1. 9,022.76
J-13 9/2/07 RPF 11,293. 11,308. 9,008.36 9,021.06
J-13 4/8/08 RPF 11,293. 11,308. 9,008.36 9,021.06
J-13 2/22/09 APF 11,283. 11,293. 8,999.92 9,008.36
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
ACTIVITYDATE SUMMARY
2/21/2009 ***ADPERF"**
( WELL SHUT IN ON ARRIVAL
INITIAL T/I/O = 140/200/0 ;
E 'PROGRAM CHANGED TO 2 7/8" PJ OMEGA HSD, 6 SPF, 60 DEG PHASING
***JOB CONTINUED ON 22-FEB-09***
J-13
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
2/22/2009'
"""CONTINUED FROM 21-FEB-2009""" ADPERF
INITIAL T/I/O = 140/200/0
PERFORATED 11283'-11293' WITH 2 7/8" PJ OMEGA HSD, 6 SPF, 60 DEG
PHASING.
CHARGE DATA: PENE 36", EH 0.34", 16 GMS.
CORRELATED TO SWS DIL LOG DATED 28 SEPT 1980.
FINAL T/I/O = 100/200/0
"**JOB COMPLETE"**
FLUIDS PUMPED
BBLS
1 diesel
1 Total
~L
._ p ~ TR~4f Ill1/If 7~1'AL
;~----
---
ProActive Diagnostic Services, Inc.
To: ALIGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
RE : Cased Hofe/Open Hole/Mechanical Logs and/or Tubing Inspection[Caliper/ MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
BP Exploration (Alaska], Inc.
Petrotechnical Data Center
Attn: Joe I~astufka
LR2-1
900 Benson Blvd.
Anchorage, Alaska 99508
and
i,~, ~~. ~ ~~, d~ i~ ~°'~~ .. kit tE%
w~`i.aa'LU'~.)GL'Lo~. ~`Fa7.~~ s ~!, t.l3Eic1
ProActive Diagnostic Services, Inc.
Attn: Robert A. Richey `~ ~-~~
130 West International Airport Road 1 ~p-p~ 3
Suite C / ~S~/~o
Anchorage, AK 99518 ~~~~,,~~, . ~,
Fax: (907] 245.8952
1) Coil Flag 16-Nov-08 J-13 EDE 50-029-20497-00
2) Coil Flag 20-Nov-08 J-13 FEE F .~ ;, , ~b 7-00
~z
_ -~~~ .
Signed . Date - ~~ ~~~
Print Name: v.
PROACTNE DIAGNOSTIC SERVICES, k~IC., 130 W. INTERNATIONAL AIRPORT Im SUfrE C, ANCHORAGE, AK 98518
PHONE: (907)245-8951 Fax: (907)245-88952
E-MAIL: ~dsan~faorageCa?reaera,orvlaa.~®an WEBSiTE:I,v~dv~nr.rraorylc~~.~~~
C:1Documerts and Semngs\Ownec\DesktapllYansmit BP.docx
•
gyr data
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N.
Houston, Texas 77043
713/461-3146
Fax: 713/461-0920
October 10, 2008
State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Re: J-Pad, Well #J-13
Prudhoe Bay, Alaska
•
0~3
\c~b
Enclosed, please find two (2) copies, and one {1) disk of the completed survey
for the above referenced well.
We would like to take this opportunity to thank you for using Gyrodata, and we
look forward to serving you in the future.
Sincerely,
~r~° ~"
~~`
Rob oup
North American Regional Manager
RS:kI
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gy data
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N.
Houston, Texas 77043
713/461-3146
Fax: 713/461-0920
SURVEY REPORT
BP
J-Pad #J-13
Wellhead
Prudhoe Bay, AK
AK0608G_133
20 Jun 2008
•
Serving the Worldwide Energy Industry with Precision Survey Instrumentation ( Q o _ O ~~
A Gyrodata Directional Survey
for
B.P. EXPLORATION (ALASKA) INC
Lease: J-PAD Well: J-13,
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
Run Date: 20 Jun 2008
Surveyor: Steve Thompson
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.326370 deg. N Longitude: 148.835630 deg. W
Azimuth Correction:
Gyro: Bearings are Relative to True North
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Well Head Location
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH .BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E
-------------------------------------------------------------------------------------------------------------------------------------------------------------
0 - 11577.28 FT. RATE CONTINUOUS MULTISHOT SURVEY
ALL MEASURED DEPTHS ARE REFERENCED TO ORIGINAL R.K.B. OF 69.07 FT. AMSL AND A BASE FLANGE OF 41.87 FT. AMSL
100.00 0.48 241.27 S 61 16 W 0.12 100.00 0.4 241.3 0.20 S 0.37W
200.00 0.50 157.00 S 23 0 E 0.16 200.00 1.0 215.3 0.81 S O.S7W
300.00 0.61 193.78 S 13 47 W 0.09 299.99 1.8 197.0 1.72 S 0.53W
400.00 0.37 177.46 S 2 33 E 0.07 399.99 2.6 194.0 2.56 S 0.64W
500.00 0.89 165.51 S 14 29 E 0.13 499.98 3.7 186.8 3.64 S 0.43W
600.00 0.47 175.70 S 4 18 E 0.11 599.97 4.8 182.5 4.80 S 0.21 W
700.00 0.34 143.84 S 36 9 E 0.06 699.97 5.5 180.0 5.45 S O.OOW
800.00 O.S2 149.34 S 30 39 E 0.05 799.97 6.1 176.2 6.07 S 0.40 E
900.00 0.24 160.56 S 19 27 E 0.07 899.97 6.7 174.0 6.66 S 0.70 E
1000.00 0.48 114.49 S 65. 3.1 E .0.09 999.97 7.1 170.7 7.04 S 1.15 E
1100.00 0.36 353.05 N 6 S7 W 0.19 1099.96 7.1 167.7 6.90 S 1.50 E
1200.00 0.37 322.13 N 37 S2 W 0.05 1199.96 6.5 168.7 6.33 S 1.26 E
1300.00 0.41 26.97 N 26 S8 E 0.10 1299.96 S.9 168.0 5.75 S 1.22 E
1400.00 0.43 12.06 N 12 3 E 0.03 1399.96 5.3 163.9 -5.07 S 1.46 E
1500.00 0.39 345.78 N 14 13 W O.OS 1499.95 4.6 161.5 4.37 S 1.46 E
1600.00 0.09 134.60 S 45 24 E 0.12 1599.95 4.3 160.7 4.10 S 1.43 E
1700.00 0.38 289.08 N 70 SSW 0.12 1699.95 4.2 163.8 4.05 S 1.17 E
•
2
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
1800.00 0.38 186.40 S 6 24 W 0.15 1799.95 4.3 169.1 4.27 S 0.82 E
1900.00 0.40 156.50 S 23 30 E 0.05 1899.95 5.0 169.3 4.92 S 0.93 E
2000.00 1.76 57.55 N 57 33 E 0.47 1999.93 5.0 151.9 4.42 S 2.36 E
2100.00 4.41 24.49 N 24 30 E 0.77 2099.79 5.3 91.0 0.10 S 5.25 E
2200.00 7.08 10.07 N 10 4 E 0.75 2199.28 12.4 39.9 9.48 N 7.92 E
2300.00 10.43 17.91 N 17 55 E 0.89 2298.10 26.9 26.0 24.17 N 11.79 E
2400.00 13.60 24.67 N 24 40 E 0.86 2395.91 47.6 24.1 43.47 N 19.48 E
2425.00 14.65 25.95 N 25 57 E 1.09 2420.15 53.7 24.3 48.98 N 22.09 E
2450.00 15.59 27.15 N 27 9 E 1.00 2444.28 60.2 24.5 54.81 N 25.01 E
2475.00 16.13 27.79 N 27 47 E 0.56 2468.33 67.1 24.8 60.88 N 28.16 E
2500.00 16.87 28.20 N 28 12 E 0.75 2492.30 74.2 25.1 67.14 N 31.49 E
2525.00 17.69 28.76 N 28 45 E 0.84 2516.17 81.6 25.4 73.67 N 35.03 E
2550.00 18.28 28.94 N 28 56 E 0.60 2539.95. 89.3 25.7 80.43 N 38.76 E
2575.00 19.25 29.06 N 29 4 E 0.97 2563...62 97.3 26.0 87.47 N 42.66 E
2600.00 20.58 29.53 N 29 32 E 1.34 '' 2587.13 '105.8 26.3 94.89 N 46.83 E
2625.00 21.49 29.68 N 29 41 E 0.91 2610.46 114.8 26.5 102.70 N 51.26 E
2650.00 22.14 29.74 N 29 44 E 0.64 2633.67 124.1 26.8 110.76 N 55.86 E
2675.00 22.47 29.75 N 29 45 E 0.34 2656.80 133.5 27.0 119.00 N 60.57 E
2700.00 22.67 29.79 N 29 47 E 0.20 2679.88 143.1 27.2 127.33 N 65.33 E
2725.00 22.95 30.03 N 30 2 E 0.30 2702.93 152.8 27.3 135.73 N 70.17 E
2750.00 23.26 30.63 N 30 38 E 0.39 2725.92 162.6 27.5 144.20 N 75.12 E
2775.00 23.77 31.07. N 31 4 E 0.54 2748.85 172.6 27.7 152.76 N 80.24 E
•
3
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
2800.00 24.77 30.88 N 30 53 E 1.01 2771.64 182.8 27.9 161.57 N 85.53 E
2825.00 25.31 30.91 N 30 55 E 0.54 2794.29 193.4 28.1 170.65 N 90.96 E
2850.00 25.72 30.85 N 30 51 E 0.41 2816.85 204.1 28.2 179.89 N 96.49 E
2875.00 26.25 30.86 N 30 52 E 0.53 2839.32 215.1 28.3 189.30 N 102.10 E
2900.00 26.82 30.65 N 30 39 E 0.57 2861.69 226.2 28.5 198.90 N 107.82 E
2925.00 27.44 30.38 N 30 23 E 0.64 2883.94 237.6 28.6 208.72 N 113.60 E
2950.00 28.18 30.15 N 30 9 E 0.74 2906.05 249.3 28.6 218.79 N 119.48 E
2975.00 28.88 30.08 N 30 5 E 0.71 2928.02 261.2 28.7 229.12 N 125.47 E
3000.00 29.56 30.29 N 30 17 E 0.68 2949.84 273.4 28.8 239.67 N 131.61 E
3025.00 29.99 30.20 N 30 12 E 0.44 2971.53 285.8 28.8 250.39 N 137.86 E
3050.00 30.33 30.26 N 30 16 E 0.34 2993.15 298.4 28.9 261.25 N 144.19 E
3075.00 30.65 30.28 N 30 17 E 0.31 3014.69 311.1 29.0. 272.20 N 150.58 E
3100.00 30.89 30.41 N 30 24 E 0.25 3036.17 323.9 29.0 283.24 N 157.04 E
3125.00 31.10 30.52 N 30 31 E 0.21.... 3057.60 336.7 29..1 294.34 N 163.57 E
3150.00 31.41 30.52 N 30 31 E 0.31 307898 349.7 29.1 305.51 N 170.15 E
3175.00 31.71 30.46 N 30 28 E 0.30 3100.28 362.8 29.2 316.78 N .176.79 E
3200.00 32.03 30.34 N 30 20 E 0.33 3121.51 376.0 29.2 328.17 N 183.47 E
3225.00 32.45 30.13 N 30 8 E 0.43 3142.66 389.3 29.2 339.69 N 190.19 E
3250.00 32.76 30.15 N 30 9 E 0.31 3163.72 402.8 29.3 351.34 N 196.95 E
3275.00 33.18 30.01 N 30 1 E 0.43 3184.69 416.4 29.3 363.11 N 203.77 E
3300.00 33.60 30.01 N 30 1 E 0.42 3205.56 430.1 29.3 375.03 N 210.65 E
•
4
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
3325.00 34.29 29.74 N 29 44 E 0.70 3226.30 444.1 29.3 387.13 N 217.60 E
3350.00 35.33 29.35 N 29 21 E 1.06 3246.83 458.4 29.3 399.55 N 224.64 E
3375.00 35.97 29.10 N 29 6 E 0.66 3267.14 472.9 29.3 412.26 N 231.75 E
3400.00 36.56 28.86 N 28 52 E 0.60 3287.30 487.7 29.3 425.20 N 238.92 E
3425.00 37.14 28.76 N 28 45 E 0.59 3307.31 502.7 29.3 438.34 N 246.14 E
3450.00 37.57 28.71 N 28 43 E 0.43 3327.18 517.9 29.3 451.64 N 253.44 E
3475.00 38.02 28.63 N 28 38 E 0.45 3346.93 533.2 29.3 465.08 N 260.79 E
.3500.00 38.53 28.59 N 28 35 E 0.51 3366.56 548.7 29.3 478.67 N 268.20 E
3525.00 39.08 28.52 N 28 31 E 0.56 3386.04 564.4 29.2 492.44 N 275.69 E
3550.00 39.69 28.41 N 28 25 E 0.60 3405.36 580.2 29.2 506.38 N 283.25 E
3575.00 40.26 28.18 N 28 11 E O.S9 3424.52 596.3 29.2 520.52 N 290.87 E
3600.00 40.72 28.03 N 28 2 E 0.47 3443.54 612.5 29.2 534.84 N 298.51 E
3625.00 41.15 27.98 N 27 59 ' E 0.43 3462.42 628.9 29.1 549.30 N 306.20 E
3650.00 41.59 28.00 N 28 0 E 0.44 3481.18 645.4 29.1 563.89 N 313.96 E
3675.00 42.11 28.05 N 28 3 E 0.52 3499.80 662.1 ..29.1 578.62 N 321.80 E
3700.00 42.63 28.02 N 28 1 E 0.52 3518.27 678.9 29.1 593.49 N 329.72 E
3725.00 43.03 27.99 N 28 0 E 0.40 3536.61 695.9 29.0 608.50 N 337.70 E
3750.00 43.49 27.9T N 27 55 E 0.46 3554.81 713.1 29.0 623.63 N 345.73 E
3775.00 43.83 27.98 N 27 59 E 0.35 3572.90 730.3 29.0 638.88 N 353.82 E
3800.00 43.65 27.78 N 27 47 E 0.23 3590.96 747.6 29.0 654.16 N 361.90 E
3825.00 43.77 27.74 N 27 44 E 0.13 3609.03 764.9 28.9 669.44 N 369.95 E
3850.00 43.91 27.76 N 27 46 E 0.15 3627.06 782.2 28.9 684.77 N 378.01 E
•
•
5
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. deg. min.
DOGLEG VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
3875.00 44.02 27.81 N 27 49 E 0.12 3645.06 799.5 28.9 700.12 N 386.10 E
3900.00 43.95 27.76 N 27 45 E 0.08 3663.04 816.9 28.9 715.48 N 394.19 E
3925.00 43.75 27.69 N 27 41 E 0.21 3681.07 834.2 28.8 730.81 N 402.25 E
3950.00 43.70 27.65 N 27 39 E 0.06 3699.14 851.5 28.8 746.12 N 410.27 E
3975.00 43.63 27.71 N 27 43 E 0.08 3717.23 868.7 28.8 761.40 N 418.29 E
4000.00 43.58 27.66 N 27 39 E 0.07 3735.33 886.0 28.8 776.67 N 426.30 E
4025.00 43.62 27.71 N 27 42 E 0.05 3753.44 903.2 28.7 791.94 N 434.31 E
4050.00 43.33 27.69 N 27 41 E 0.28 3771.58 920.4 28.7 807.17 N 442.30 E
4075.00 43.28 27.66 N 27 39 E 0.06 3789.77 937.6 28.7 822.35 N 450.27 E
4100.00 43.51 27.69 N 27 42 E 0.23 3807.93 954.7 28.7 837.56 N 458.25 E
4125.00 43.70 27.60 N 27 36 E 0.21 3826.04 972.0 28.7 852.84 N 466.25 E
4150.00 43.64 27.66 N 27 40 E 0.08 3844.12 989.2 28.6 868.13 N 474.25 E
4175.00 43.46 27.72 N 27 43 E 0.18 3862.24 1006.4 28.6 883.38 N 482.26 E
4200.00 43.29 27.73 N 27 44 E 0.17 3.880.41 1023.6 28.6. 898.58 N 490.25 E
4225.00 43.16 27.88 N 27 53 E O.1G 3898.63 1040.7 28.6 913.73 N 498.23 E
4250.00 42.88 28.14 N 28 8 E 0.33 3916.91 1057.8 28.6 928.78 N 506.24 E
4275.00 42.63 28.47 N 28 28 E 0.34 3935.26 1074.8 28.6 943.73 N 514.29 E
4300.00 42.57 28.55 N 28 33 E 0.08 3953.67 1091.7 28.6 958.60 N 522.36 E
4325.00 42.43 28.73 N 28 44 E 0.18 3972.10 1108.6 28.6 973.42 N 530.46 E
4350.00 42.49 28.74 N 28 44 E 0.06 3990.54 1125.4 28.6 988.22 N 538.57 E
4375.00 42.50 28.67 N 28 40 E 0.05 4008.98 1142.3 28.6 1003.03 N 546.68 E
4400.00 42.38 28.92 N 28 55 E 0.21 4027.42 1159.2 28.6 1017.82 N 554.81 E
A Gyrodata Directional Survey
•
6
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. .deg. min.
DOGLEG VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
4425.00 42.05 29.00 N 29 0 E 0.33 4045.94 1176.0 28.6 1032.51 N 562.94 E
4450.00 42.24 28.98 N 28 59 E 0.18 4064.48 1192.8 28.6 1047.19 N 571.07 E
4475.00 42.38 29.01 N 29 1 E 0.15 4082.97 1209.6 28.6 1061.90 N 579.23 E
4500.00 42.02 29.09 N 29 5 E 0.37 4101.49 1226.4 28.6 1076.58 N 587.39 E
4525.00 41.99 29.10 N 29 6 E 0.03 4120.06 1243.1 28.6 1091.20 N 595.52 E
4550.00 42.02 29.08 N 29 5 E 0.03 4138.64 1259.9 28.6 1105.82 N 603.66 E
4575.00 42.16 29.14 N 29 8 E 0.14 4157.19 1276.6 28.6 1120.46 N 611.81 E
4600.00 41.95 29.06 N 29 4 E 0.22 4175.76 1293.4 28.6 1135.09 N 619.95 E
4625.00 41.82 29,07 N 29 4 E 0.13 4194.37 1310.0 28.6 1149.68 N 628.06 E
4650.00 41.68 29.21 N 29 13 E 0.17 4213.02 1326.7 28.7 1164.22 N 636.16 E
4675.00 41.76 29.22 N 29 13 E 0.08 4231.68 1343.3 28.7 1178.74 N 644.29 E
4700.00 41.73 29.36 N 29 22 E 0.10 4250.33 1360.0 28.7 1193.26 N 652.43 E
4725.00 41.49 29.54 N 29 32 E 0.26 4269.03 1376.6 28.7 1207.72 N 660.59 E
4750.00 41.46 29.9.1 N 29 55 E 0.25 4287.76 1393.1 28.7 1222.10 N 668.80 E
4775.00 41.17 30:22 N 30 13 E 0.35 4306.53 1409.6 28.7 1236.38 N 677.07 E
4800.00 41.09 30.44 N 30 27 E 0.17 4325.36 1426.1 28.7 1250.58 N 685.38 E
4825.00 40.98 30.60 N 30 36 E 0.15 4344.22 1442.5 28.7 1264.71 N 693.71 E
4850.00 40.72 30.72 N 30 43 E 0.27 4363.13 1458.8 28.8 1278.78 N 702.05 E
4875.00 40.70 30.73 N 30 44 E 0.03 4382.08 1475.1 28.8 1292.80 N 710.38 E
4900.00 40.72 30.86 N 30 51 E 0.09 4401.03 1491.4 28.8 1306.80 N 718.73 E
4925.00 40.64 30.92 N 30 55 E 0.09 4419.99 1507.7 28.8 1320.79 N 727.09 E
A Gyrodata Directional Survey
•
7
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
4950.00 40.56 30.87 N 30 52 E 0.08 4438.97 1524.0 28.9 1334.75 N 735.45 E
4975.00 40.66 30.99 N 31 0 E 0.13 4457.95 1540.2 28.9 1348.71 N 743.81 E
5000.00 40.58 31.00 N 31 0 E 0.09 4476.93 1556.5 28.9 1362.66 N 752.19 E
5025.00 40.56 30.98 N 30 59 E 0.02 4495.92 1572.7 28.9 1376.60 N 760.56 E
5050.00 40.54 31.03 N 31 2 E 0.04 4514.92 1589.0 28.9 1390.53 N 768.94 E
5075.00 40.36 30.96 N 30 58 E 0.18 4533.94 1605.2 29.0 1404.43 N 777.29 E
5100.00 40.37 31.13 N 31 8 E 0.11 4552.99 1621.4 29.0 1418.30 N 785.64 E
5125.00 40.40 31.23 N 31 14 E 0.07 4572.03 1637.5 29.0 1432.16 N 794.03 E
5150.00 40.33 31.16 N 3I 9 E 0.09 4591.08 1653.7 29.0 1446.01 N 802.41 E
5175.00 40.25 31.22 N 31 13 E - 0.09 4610.15 1669.9 29.0 1459.84 N 810.78 E
5200.00 39.89 31.21 N 31 12 E 0.36. 4629.28 1686.0 29.1 1473.61 N 819.12 E
5225.00 40.03 31.27 N 31 16 E 0.1.4 4648.44 1702.0 29.1 1487.34 N 827.45 E
5250.00 40.07 3 L25 N 31 15 E 0.04 4667.58 1'718.1 29.1 1501.09 N 835.80 E
5275.00 39.95 31.19 N 31 11 E 0.1;3 4686.73 1734.1 29.1 1514.83 N 844.13 E
5300.00 39.58 31.26 N _31 16 E 0.37 4705.94 1.750.1 29.1. 1528.50 N 852.42 E
5325.00 39.51 31.32 N 31 19 E 0.08 4725.22 1766.0 29.2 1542.11 N 860.69 E
5350.00 39.37 31.38 N 31 23 E 0.15 4744.53 1781.9 29.2 1555.67 N 868.95 E
5375.00 39.37 31.58 N 31 35 E 0.13 4763.85 1797.8 29.2 1569.20 N .877.23 E
5400.00 39.20 31.90 N 31 54 E 0.26 4783.21 1813.6 29.2 1582.66 N 885.56 E
5425.00 39.33 32.07 N 32 4 E 0.18 4802.56 1829.4 29.3 1596.08 N 893.94 E
5450.00 39.47 32.05 N 32 3 E 0.13 4821.88 .1845.2 29.3 1609.53 N 902.36 E
5475.00 39.24 32.23 N 32 14 E 0.25 4841.21 1861.1 29.3 1622.95 N 910.79 E
~~
•
8
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
5500.00 39.14 32.23 N 32 14 E 0.10 4860.59 1876.8 29.3 1636.31 N 919.22 E
5525.00 39.24 32.47 N 32 28 E 0.18 4879.96 1892.6 29.4 1649.66 N 927.67 E
5550.00 39.13 32.47 N 32 28 E 0.11 4899.34 1908.4 29.4 1662.98 N 936.15 E
5575.00 38.96 32.81 N 32 48 E 0.27 4918.76 1924.1 29.4 1676.25 N 944.65 E
5600.00 38.82 33.22 N 33 13 E 0.29 4938.21 1939.8 29.4 1689.41 N 953.20 E
5625.00 38.81 33.79 N 33 47 E 0.36 4957.69 1955.4 29.5 1702.48 N 961.85 E
5650.00 38.93 34.14 N 34 9 E 0.26 4977.16 1971.0 29.5 1715.49 N 970.61 E
5675.00 38.93 34.14 N 34 9 E 0.00 4996.61 1986.7 29.5 1728.49 N 979.43 E
5700.00 38.93 34.15 N 34 9 E 0.01 5016.05 2002.4 29.6 1741.49 N 988.25 E
5725.00 38.94 34.21 N 34 13 E 0.04 5035.50 2018.0 29.6 1754.49 N 997.07 E
5750.00 39.14 34.22 N 34 13 E 0.20. 5054.92 2033.7 29.6 1767.51 N 1005.93 E
5775.00 39.37 34.26 N 34 16 E 0.24 5074.28 2049.5 29.7 1780.59 N 1014.83 E
5800.00 39.45 34.19 N 34 12 E 0.09 5093.59 2065.3 29.7 1793.71 N 1023.76 E
5825.00 39.29 34.26 N 34 15 E 0.17 5112.92 2081..1.. 29.7. 1806.82 N 1032.68 E
5850.00 39.48 34.30 N 34 I8 E 0.19 5132.24 2096.9 29.8 1819.93 N 1041.61 E
.5875.00 39.66 34.37 N 34 22 E 0.19 5151.51 2112.8 29.8 1833.08 N 1050.59 E
5900.00 39.74 34.35 N 34 21 E 0.07 5170.75 2128.7 29.9 1846.26 N 1059.61 E
5925.00 39.74 34.29 N 34 18 E 0.04 5189.97 2144.7 29.9 1859.46 N 1068.62 E
5950.00 39.71 34.29 N 34 18 E 0.03 5209.20 2160.6 29.9 1872.66 N 1077.62 E
5975.00 39.54 34.19 N 34 11 E 0.18 5228.45 2176.5 29.9 1885.84 N 1086.59 E
6000.00 39.67 34.17 N 34 10 E 0.13 5247.71 2192.4 30.0 1899.03 N 1095.55 E
6025.00 39.79 34.10 N 34 6 E 0.12 5266.94 2208.3 30.0 1912.26 N 1104.51 E
r1
U
n
9
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
6050.00 39.63 34.17 N 34 10 E 0.16 5286.17 2224.3 30.0 1925.48 N 1113.47 E
6075.00 39.63 34,10 N 34 6 E 0.05 5305.43 2240.2 30.1 1938.68 N 1122.42 E
6100.00 39.77 34.03 N 34 2 E 0.15 5324.66 2256.1 30.1 1951.90 N 1131.37 E
6125.00 39.80 33.95 N 33 57 E 0.07 5343.87 2272.0 30.1 1965.17 N 1140.31 E
6150.00 39.84 33.96 N 33 58 E 0.04 5363.07 2288.0 30.2 1978.45 N 1149.25 E
6175.00 39.89 33.88 N 33 53 E 0.07 5382.26 2304.0 30.2 1991.75 N 1158.20 E
6200.00 39.91 33.84 N 33 50 E 0.03 5401.44 2320.0 30.2 2005.06 N 1167.13 E
6225.00 40.09 33.73 N 33 44 E 0.19 5420.59 2336.1 30.2 2018.42 N 1176.07 E
6250.00 40.02 .33.73 N 33 44 E 0.07 5439.73 2352.1 ;30.3 2031.80 N 1185.00 E
6275.00 40.13 33.80 N 33 48 E 0.12 5458.86 2368.2 30.3 2045.18 N 1193.95 E
6300.00 39.86 33.72 N 33 43 E 0.27 5478.01 2384.2 30.3 2058.54 N 1202.88 E
6325.00 39.72 33.71 N 33 42 E 0.14 5497.22 2400.2 3'0.3 2071.85 N 1211.76 E
6350.00 39.93 33.66 N 33 40 E 0.21 5516.42 2416.2 30.3 2085.17 N 1220.64 E
6375.00 40.45. .33.70 N 33 42 E 0.52 5535.52 2432.3 30.4 2098.60 N 1229.58 E
6400.00 40.71 33.55 N 33 33 E 0.28 5554.50 2448.5 30.4 2112.14 N 1238.59 E
6425.00 40.96 33.37 N 33 22 E 0.27 5573.42 2464.8 30.4 2125.78 N 1247.60 E
6450.00 41.06 33.41 N 33 25 E 0.11 5592.28 2481.2 30.4 2139.47 N 1256.63 E
6475.00 40.89 33.41 N 33 25 E 0.17 5611.16 2497.6 30.4 2153.16 N 1265.66 E
6500.00 40.93 33.35 N 33 21 E 0.06 5630.05 2513.9 30.5 2166.83 N 1274.66 E
6525.00 41.11 33.35 N 33 21 E 0.18 5648.91 2530.3 30.5 2180.54 N 1283.68 E
6550.00 41.31 33.35 N 33 21 E 0.20 5667.72 2546.8 30.5 2194.30 N 1292.74 E
•
•
10
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
6575.00 41.33 33.35 N 33 21 E 0.02 5686.50 2563.3 30.5 2208.08 N 1301.81 E
6600.00 41.24 33.48 N 33 29 E 0.12 5705.28 2579.7 30.5 2221.85 N 1310.90 E
6625.00 41.47 33.49 N 33 30 E 0.22 5724.05 2596.2 30.6 2235.63 N 1320.01 E
6650.00 41.45 33.55 N 33 33 E 0.04 5742.78 2612.8 30.6 2249.43 N 1329.15 E
6675.00 41.48 33.41 N 33 25 E 0.10 5761.52 2629.3 30.6 2263.23 N 1338.29 E
6700.00 41.42 33.44 N 33 26 E 0.07 5780.26 2645.8 30.6 2277.04 N 1347.40 E
6725.00 41.70 33.53 N 33 32 E 0.29 5798.96 2662.4 30.6 2290.88 N 1356.55 E
6750.00 41.95 33.41 N 33 25 E 0.26 5817.59 2679.0 30.6 2304.78 N 1365.75 E
6775.00 41.70 33.49 N 33 30 E 0.25 5836.22 2695.7 30.7 2318.69 N 1374.94 E
6800.00 41.50 33.56 N 33 33 E 0.20 5854.92 2712.3 30.7 2332.53 N 1384.10 E
6825.00 41.67 33.46 N 33 27 E 0.18 5873.62 2728.8 30.7 2346.36 N 1393.26 E
6850.00 41.89 33.55 N 33 33 E 0.23 5892.26 2745.5 30.7 2360.25 N 1402.46 E
6875.00 41.83 33.50 N 33 30 E 0.08 5910.88 2762.1 30.7 2374.16 N 1411.67 E
6900.00 41.70 33.61 N 33 37 E 0.15 5929.53 2778.8 30.8 2388.04 N 1420.88 E
6925.00 41.43 33.66. N 33 40 E 0..27 .5948.23 2795.3. 30.8 2401.85 N 1430.07 E
6950.00 41.46 33.70 N 33 42 E 0.03 5966.97 2811.9 30.8 2415.62 N 1439.24 E
6975.00 41.50 33.73 N 33 44 E 0.05 5985.70 2828.4 30.8 2429.39 N 1448.43 E
7000.00 41.32 33.68 N 33 41 E 0.19 6004.45 2844.9 30.8 2443.15 N 1457.61 E
7025.00 41.33 33.66 N 33 39 E 0.02 6023.23 2861.4 30.8 2456.89 N 1466.76 E
7050.00 41.25 33.73 N 33 44 E 0.09 6042.01 2877.9 30.9 2470.61 N 1475.91 E
7075.00 41.33 33.75 N 33 45 E 0.08 6060.79 2894.4 30.9 2484.33 N 1485.07 E
7100.00 41.31 33.79 N 33 48 E 0.04 6079.57 2910.9 30.9 2498.06 N 1494.25 E
•
11
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. deg. min.
DOGLEG VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
7125.00 41.12 33.79 N 33 47 E 0.19 6098.38 2927.3 30.9 2511.74 N 1503.41 E
7150.00 40.93 33.72 N 33 43 E 0.19 6117.24 2943.7 30.9 2525.39 N 1512.53 E
7175.00 41.08 33.78 N 33 47 E 0.15 6136.10 2960.1 30.9 2539.03 N 1521.64 E
7200.00 41.02 33.76 N 33 46 E 0.06 6154.96 2976.5 30.9 2552.67 N 1530.77 E
7225.00 41.06 33.82 N 33 49 E 0.06 6173.81 2992.9 31.0 2566.31 N 1539.90 E
7250.00 41.02 33.79 N 33 48 E 0.05 6192.67 3009.3 31.0 2579.96 N 1549.03 E
7275.00 40.90 33.81 N 33 49 E 0.12 6211.55 3025.6 31.0 2593.57 N 1558.15 E
7300.00 41.01 33.90 N 33 54 E 0.12 6230.43 3042.0 31.0 2607.18 N 1567.28 E
7325.00 41.03 33.85 N 33 51 E 0.04 6249.29 3058.4 31.0 2620.80 N 1576.42 E
7350.00 40.90 33.82 N 33 49 E 0.13 6268.17 3074.8 31.0 2634.42 N 1585.55 E
7375.00 41.12 33.82 N 33 49 E 0.22 6287.03 3091.1 31.1 2648.05 N 1594.68 E
7400.00 41.34 33.63 N 33 38 E 0.25 6305.84 3107.6 31.1 2661.75 N 1603.83 E
7425.00 41.39 33.38 N 33 23 E 0.17 6324.60 3124.1 31.1 2675.53 N 1612.94 E
7450.00 41.67 33.40. N 33 24 E 0.28. 6343.31. 3140.7. 31.1 2689.37 N 1622.07 E
7475.00 41.91 33.26 N 33 16 E 0.26 6361.95 3157.3 31.1 2703.29 N 1631.22 E
7500.00 42.04 33.15 N 33 9 E 0.15 6380.54 3174.0 31.1 2717.28 N 1640.38 E
7525.00 42.31 33.18 N 33 11 E 0.27 6399.07 3190.8 31.1 2731.33 N 1649.56 E
7550.00 42.27 33.12 N 33 7 E 0.06 6417.56 3207.6 31.1 2745.41 N .1658.76 E
7575.00 42.55 33.21 N 33 13 E 0.29 6436.02 3224.5 31.2 2759.52 N 1667.98 E
7600.00 42.86 33.10 N 33 6 E 0.32 6454.39 3241.4 31.2 2773.72 N 1677.25 E
7625.00 42.91 33.02 N 33 1 E 0.07 6472.71 3258.4 31.2 2787.97 N 1686.53 E
7650.00 43.01 33.07 N 33 4 E 0.10 6491.01 3275.4 31.2 2802.25 N 1695.82 E
A Gyrodata Directional Survey
•
•
12
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
7675.00 43.40 33.08 N 33 5 E 0.39 6509.23 3292.5 31.2 2816.60 N 1705.16 E
7700.00 43.40 33.03 N 33 2 E 0.04 6527.40 3309.7 31.2 2830.99 N 1714.53 E
7725.00 43.59 33.02 N 33 1 E 0.19 6545.53 3326.9 31.2 2845.42 N 1723.91 E
7750.00 43.74 33.08 N 33 5 E 0.16 6563.62 3344.2 31.2 2859.89 N 1733.33 E
7775.00 43.83 33.08 N 33 5 E 0.08 6581.66 3361.4 31.2 2874.38 N 1742.77 E
7800.00 44.02 33.07 N 33 4 E 0.19 6599.67 3378.8 31.2 2888.92 N 1752.23 E
7825.00 44.01 33.14 N 33 8 E 0.05 6617.65 3396.1 31.2 2903.47 N 1761.72 E
7850.00 43.95 33.24 N 33 15 E 0.10 6635.64 3413.5 31.3 2917.99 N 1771.22 E
7875.00 44.08 33.47.. N 33 28 E 0.21 6653.62 :3430.9 31.3 2932.50 N 1780.78 E
7900.00 44.03 33.60 N 33 36 E 0.10 6671.59 3448.2 313 2946.99 N 1790.38 E
7925.00 43.92 33.92 N 33 55 E 0.25. 6689.58 3465.6 31.3 2961.42 N 1800.03 E
7950.00 44.06 34.09 N 34 5 E 0.18 6707.57 3482.9 31.3 2975.82 N 1809.74 E
7975.00 44.05 34.37 N 34 22 E 0.1`9 6725.53 3500.3 31.3 2990.19 N 1819.51 E
8000.00 44.17 34.51 N 34 30 E 0.16 6743.48 3517.6 31.3 3004.54 N 1829.36 E
8025.00 44.50 34.64 N 34 38 E 033 6761.36 3535.1 31.4 3018.93 N 1839.27 E
8050.00 44.85 34.69 N 34 42 E 0.35 6779.14 3552.6 31.4 3033.39 N 1849.27 E
8075.00 45.31 34.74 N 34 44 E 0.46 6796.80 3570.3 31.4 3047.94 N 1859.35 E
8100.00 45.95 34.80 N 34 48 E 0.64 6814.28 3588.1 31.4 3062.61 N 1869.54 E
8125.00 46.48 34.96 N 34 57 E 0.54 6831.58 3606.2 31.4 3077.42 N 1879.86 E
8150.00 47.48 35.01 N 35 0 E 1.00 6848.64 3624.4 31.4 3092.39 N 1890.34 E
8175.00 48.41 35.09 N 35 5 E 0.94 6865.38 3642.9 31.5 3107.59 N 1901.00 E
•
•
13
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
8200.00 49.20 35.09 N 35 5 E 0.79 6881.85 3661.7 31.5 3122.98 N 1911.81 E
8225.00 50.18 35.08 N 35 5 E 0.99 6898.02 3680.7 31.5 3138.58 N 1922.77 E
8250.00 50.94 35.03 N 35 2 E 0.76 6913.90 3700.0 31.5 3154.39 N 1933.86 E
8275.00 51.67 35.12 N 35 7 E 0.73 6929.53 3719.5 31.5 3170.36 N 1945.07 E
8300.00 52.44 35.15 N 35 9 E 0.78 6944.90 3739.1 31.5 3186.48 N 1956.42 E
8325.00 53.08 35.22 N 35 13 E 0.64 6960.03 3759.0 31.6 3202.75 N 1967.89 E
8350.00 53.73 35.18 N 35 11 E 0.65 6974.93 3779.0 31.6 3219.15 N 1979.46 E
8375.00 54.58 35.26 N 35 16 E 0.85 6989.57 3799.3 31.6 3235.70 N 1991.14 E
8400.00 55.26 35.23 N 35 14 E 0.68 7003.94 3819.7 31.6 3252.41 N 2002.95 E
8425.00 56.06 35.23- N 35 14 E 0.80 7018.04 3840.3 31.6 3269.27 N 2014.86 E
8450.00 57.04 35.16 N 35 9 E 0.98 7031.82 3861.1 31.7 3286.32 N 2026.88 E
8475.00 57.88 35.24 N 35 15 E 0.84 7045.27. 3882.1 31.7 3303.54 N 2039.03 E
8500.00 58.53 35.33 N 35 20 E 0.65 7058.44' 3903.3 31.7. 3320.89 N 2051.31 E
8525.00 59.37 35.18 N 35 11 E 0.85 7071.33 3924.7 31.7 3338.38 N 2063.67 E
8550.00 59.87 35.26 _N 35 16 E 0.51 7083.98 3946.3 31.7. 3355.99N 2076.11 E
8575.00 60.55 35.35 N 35 21 E 0.68 7096.40 3967.9 31.8 3373.70 N 2088.65 E
8600.00 61.05 35.24 N 35 15 E 0.50 7108.59 3989.7 31.8 3391.51 N 2101.26 E
8625.00 60.98 35.09 N 35 5 E 0.15 7120.71 4011.5 31.8 3409.39 N 2113.85 E
8650.00 60.90 35.05 N 35 3 E 0.09 7132.85 4033.3 31.8 3427.27 N 2126.41 E
8675.00 60.75 35.11 N 35 7 E 0.15 7145.04 4055.1 31.8 3445.14 N 2138.95 E
8700.00 60.49 35.11 N 35 6 E 0.27 7157.30 4076.9 31.9 3462.96 N 2151.48 E
8725.00 60.43 35.00 N 35 0 E 0.11 7169.63 4098.6 31.9 3480.76 N 2163.97 E
•
.,
14
B.P. Exploration (Alaska) Inc
Lease: J-PAD We11: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. deg. min.
DOGLEG VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
8750.00 60.14 34.97 N 34 58 E 0.29 7182.03 4120.3 31.9 3498.55 N 2176
42 E
8775.00 59.87 35.01 N 35 1 E 0.27 7194.53 4141.9 31.9 3516.29 N .
2188.84 E
8800.00 59.77 35.06 N 35 3 E 0.10 7207.09 4163.5 31.9 3533.98 N 2201.25 E
8825.00 59.66 35.14 N 35 8 E 0.13 7219.70 4185.0 31.9 3551.64 N 2213
66 E
8850.00 59.41 35.12 N 35 7 E 0.25 7232.37 4206.5 32.0 3569.27 N .
2226.06 E
8875.00 59.36 35.05 N 35 3 E 0.08 7245.10 4228.0 32.0 3586.88 N 2238.42 E
8900.00 58.98 34.96 N 34 57 E 0.39 7257.92 4249.5 32.0 3604.46 N 2250
74 E
8925.00 58.06 35.19 N 35 11 E 0.94 7270.97 4270.8 32.0 3621.91 N .
2262.99 E
8950.00 56.63 35.43 N 35 26 E 1,44 7284.46 4291.8 32.0 3639.08 N 2275.16 E
8975.00 55.37 35.56 N 35 34 E 1.27 7298.44 4312.5 32.0 3655.96 N 2287.19 E
9000.00 54.23 35.33 N 35 20 E 1.15' 7312.85 4332.8 32.0 3672.60 N 2299.04 E
9025.00 53.29 35.05 N 35 3 E 0.97 7327.63 4353.0 32.1 3689.08 N 2310.66 E
9050.00 52.45 35.26 N 35 16 E 0.85 7342.72 4372.9 32.1 3705.37 N 2322.14 E
9075.00 51.06 35.57 N 35 34 E 1.42. 73.58.20 4392.5 32.1 3721.38 N 2333.51 E
9100.00 49.50 35.75 N 35" 45 E 1.56 7374.17 4411.7 32.1 3737.00N 2344.72 E
9125.00 48.14 35.96 N 35 58 E 1.37 7390.63 4430.5 32.1 3752.25 N 2355.74 E
9150.00 47.44 36.27 N 36 16 E 0.74 7407.43 4448.9 32.1 3767.21 N 2366.66 E
9175.00 47.09 36.18 N 36 11 E 0.35 7424.39 4467.2 32.2 3782.02 N 2377.51 E
9200.00 46.79 35.88 N 35 53 E 0.38 7441.46 4485.5 32.2 3796.79 N 2388.26 E
9225.00 46.83 35.92 N 35 55 E 0.05 7458.57 4503.7 32.2 3811.55 N 2398.94 E
9250.00 46.85 35.86 N 35 52 E 0.05 7475.67 4521.8 32.2 3826.33 N 2409.63 E
9275.00 46.93 35.84 N 35 50 E 0.08 7492.76 4540.1 32.2 3841.12 N 2420.32 E
A Gyrodata Directional Survey
•
L~
15
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
9300.00 46.93 35.67 N 35 40 E 0.12 7509.83. 4558.3 32.2 3855.94 N 2430.99 E
9325.00 46.88 35.68 N 35 41 E 0.06 7526.91 4576.5 32.2 3870.77 N 2441
64 E
9350.00 46.70 35.84 N 35 50 E 0.21 7544.03 4594.7 32.3 3885.56 N .
2452
29 E
.9375.00 46.77 35.76 N 35 45 E 0.09 7561.16 4612.9 32.3 3900.32 N .
2462
94 E
9400.00 46.49 35.85 N 35 51 E 0.29 7578.33 4631.0 32.3 3915.06 N .
2473
57 E
9425.00 46.23 35.68 N 35 41 E 0.29 7595.58 4649.1 32.3 3929.74 N .
2484.14 E
9450.00 46.21 35.74 N 35 44 E 0.04 7612.88 4667.1 32.3 3944.40 N 2494
68 E
9475.00 46.08 35.58 N 35 35 E 0.17 7630.20 4685.1 32.3 3959.05 N .
2505
18 E
95.00.00 46.11 35.38 N 35 23 E 0.15 7647.54 4703.1 32.3 3973.72 N .
2515
64 E
9525.00 46.21 35.28 N 35 T7 E 0.12 7664.86 4721.1 32.3 3988.43 N .
2526
07 E
9550.00 46.01 35.35 N 35 21 E 0.20 7682.19 4739.1 32.4. 4003.13 N .
2536.48 E
9575.00 46.11 35.34 N 35 20 E 0.10 7699.53 4757.0 32.4 4017.81 N 2546
90 E
9600.00 45.86 35.11 N 35 7 E 0.30 7716.90 4775.0 32.4 4032.50 N .
2557
27 E
9625.00 45.33 34.84 N 34 50 E 0.57 7734.40 4792.8 32.4 4047.13 N .
2567
51 E
9650.00 44.34 - 34.90 N 34 54 E 0.99 7752.12 4810.5 32.4 4061.60 N .
2577
58 E
9675.00 43.42 35.05 N 35 3 E 0.93 7770.14 4827.8 32.4 4075.80 N .
2587.52 E
9700.00 42.87 35.13 N 35 8 E 0.56 7788.38 4844.8 32.4 4089.79 N 2597
35 E
9725.00 42.85 34.69 N 34 42 E 0.29 7806.71 4861.8 32.4 4103.73 N .
2607
08 E
9750.00 42.66 34.92 N 34 55 E 0.24 7825.07 4878.8 32.4 4117.67 N .
2616
77 E
9775.00 42.67 35.05 N 35 3 E 0.09 7843.45 4895.7 32.4 4131.55 N .
2626
48 E
9800.00 42.64 34.63 N 34 38 E 0.28 7861.84 4912.6 32.5 4145.45 N .
2636.16 E
•
16
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. deg. min.
DOGLEG VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
•
9825.00 42.62 34.44
9850.00 42.67 34.11
9875.00 42.57 34.16
9900.00 42.46 34.15
9925.00 42.53 34.22
9950.00 42.56 34.28
9975.00 42.34 34.38
10000.00 42.55 34.26
10025.00 42.46 34.54
10050.00 42.31 34.78
10075.00 42.48 34.99
10100.00 42.42 34.95
10125.00 42.39 34.93
10150.00 42.40 35.44
10175.00 42.45 3 5.31
10200.00 42.55 35.01
10225.00 42.37 35.38
10250.00 42.53 35.26
10275.00 42.09 35.14
10300.00 42.11 35.48
10325.00 42.14 35.51
10350.00 42.05 35.50
N 34 26 E 0.13 7880.23 4929.6 32.5 4159.40 N 2645.75 E
N 34 6 E 0.23 7898.62 4946.5 32.5 4173.39 N 2655.29 E
N 34 10 E 0.10 7917.02 4963.4 32.5 4187.41 N 2664.79 E
N 34 9 E 0.11 7935.44 4980.3 32.5 4201.39 N 2674.28 E
N 34 13 E 0.08 7953.88 4997.2 32.5 4215.36 N 2683.77 E
N 34 17 E 0.05 7972.29 5014.1 32.5 4229.33 N 2693.28 E
N 34 23 E 0.23 7990.74 5030.9 32.5 4243.26 N 2702.80 E
N 34 16 E 0.22 8009.19 5047.8 32.5 4257.20 N 2712.31 E
N 34 33 E 0.21 8027:62 5064.7 32.5 4271.14 N 2721.85 E
N 34 47 E 0.22 - 8046.08 5081.5 32.5. 4285.00 N 2731.44 E
N 34 59 E 0.21 8064.55 5098.4 32.5 4298.83 N 2741.08 E
N 34 57 E 0.06 8082.99. 5115.2 32.5 4312.65 N 2750.75 E
N 34 56 E 0.04 $101.45 5132.1 32.5 4326.47 N 2760.40 E
N 35 26 E 0.34 8119.92 5148.9 32.5 4340.25 N 2770.12 E
N 35 19 E 0.10 8138.37 5165.8 32.6 43.54.00 N 2779.88 E
N 35 0 E 0.23 8156.80 5182.6 32.6 4367.81 N 2789:61 E
N 35 23 E 0.31 8175.24 5199.5 32.6 4381.60 N 2799.33 E
N 35 15 E 0.18 8193.69 5216.3 32.6 4395.37 N 2809.09 E
N 35 8 E 0.45 8212.18 5233.2 32.6 4409.12 N 2818.79 E
N 35 29 E 0.23 8230.73 5249.9 32.6 4422.80 N 2828.48 E
N 35 31 E 0.04 8249.27 5266.6 32.6 4436.45 N 2838.21 E
N 35 30 E 0.09 8267.83 5283.4 32.6 4450.09 N 2847.95 E
•
17
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH ~ BEARING
feet deg. deg. deg. min.
DOGLEG .VERTICAL CLOSURE HORIZONTAL
SEVERITY DEPTH DIST. AZIMUTH COORDINATES
deg./ feet feet deg. feet
25 ft.
10375.00 42.02 35.66 N 35 39 E 0.11 8286.39 5300.1 32.6 4463.71 N 2857.68 E
10400.00 41.91 35.79 N 35 47 E 0.14 8304.98 5316.8 32.6 4477.28 N 2867.45 E
10425.00 41.63 35.84 N 35 50 E 0.28 8323.63 5333.4 32.6 4490.78 N 2877.19 E
10450.00 41.70 35.96 N 35 57 E 0.11 8342.30 5350.0 32.7 4504.25 N 2886.94 E
10475.00 41.70 35.88 N 35 53 E 0.05 8360.97 5366.6 32.7 4517.72 N 2896.69 E
10500.00 41.51 35.87 N 35 52 E 0.19 8379.66 5383.2 32.7 4531.17 N 2906.42 E
10525.00 41.48 36.26 N 36 16 E 0.26 8398.38 5399.7 32.7 4544.56 N 2916.17 E
10550.00 41.40 36.54 N 36 32 E 0.20 8417.12 5416.2 32.7 4557.88 N 2925.99 E
10575.00 41.25 36.72 N 36 43 E 0.19 8435.90 5432.7 32.7 4571.12 N 2935.84 E
10600.00 41.26 36.97 N 36 58 E 0.17 8454.69 5449.2 32.7 4584.32 N 2945.73 E
10625.00 41.13 37.04 N 37 3 E 0.14 8473.51 5465.6 32
7 4597
47 N 2955
64 E
10650.00 41.05 36.97 N 36 58 E 0.09 8492.35 5482.0 .
32.7 .
4610.59 N .
2965.53 E
10675.00 40.68 37.06 N 37 3 E ` 0.38 8511.25 5498.3 32.8 4623.65 N 2975.37 E
10700.00 40.36 37.24. N 37 14 E 0.34. 8530.26. 5514.5 32.8 4636.60 N 2985.18 E
10725.00 40.11 37.44 N 37 26 E 0.28 854934 5530.6 32.8 4649.44 N 2994.98 E
10750.00 39.75 37.49 N 37 29 E 0.36 8568.51 5546.6 32.8 4662.18 N 3004.74 E
10775.00 39.68 37.43 N 37 26 E 0.08 8587.74 5562.5 32.8 4674.86 N 3014.45 E
10800.00. 39.65 37.96 N 37 57 E 0.33 8606.99 5578.4 32.8 4687.48 N 3024.21 E
10825.00 39.11 39.05 N 39 3 E 0.88 8626.31 5594.2 32.8 4699.90 N 3034.08 E
10850.00 38.33 40.48 N 40 29 E 1.19 8645.81 5609.7 32.9 4711.92 N 3044.09 E
10875.00 37.55 41.77 N 41 46 E 1.1 l 8665.53 5624.9 32.9 4723.49 N 3054.19 E
10900.00 37.25 42.19 N 42 11 E 0.39 8685.39 5639.9 32.9 4734.78 N 3064.35 E
A Gyrodata Directional Survey
r~
18
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
10925.00 36.95 41.91 N 41 55 E 0.34 8705.33 5654.8 32.9 4745.98 N 3074.45 E
10950.00 36.74 41.65 N 41 39 E 0.26 8725.34 5669.6 33.0 4757.16 N 3084
44 E
10975.00 36.23 41.60 N 41 36 E 0.51 8745.44 5684.3 33.0 4768.27 N .
3094
31 E
11000.00 35.82 41.53 N 41 32 E 0.41 8765.66 5698.8 33.0 4779.27 N .
3104
07 E
11025.00 35.43 41.42 N 41 25 E 0.39 8785.98 5713.2 33.0 4790.18 N .
3113
71 E
11050.00 34.99 41.37 N 41 22 E 0.44 8806.40 5727.5 33.0 4800.99 N .
3123.25 E
11075.00 34.79 41.35 N 41 21 E 0.20 8826.91 5741.6 33.1 4811.73 N 3132
70 E
11100.00 34.46 41.23 N 41 14 E 0.34 8847.48 5755.7 - 33.1 4822.40 N .
3142
07 E
11125.00 34.40 .41.21 N 41 13 E 0:.06 8868.10 .5769:7 33.1 4833.03 N .
3151
38 E
11150.00 34.01 41.13 N 41 8 E 0.39 8888.78 5783.6 33.1 4843.61 N .
3160
63 E
11175.00 33.91 40.97 N 40 58 E 0.14 8909.52 5797.4 33.1 4854.14 N .
3169.81 E
11200.00 33.55 41.01 N 41 l E 0.36 8930.31 5811.2 33.2 4864.62 N 3178
91 E
11225.00 33.17 40.78 N 40 47 E 0.40 8951.19 5824.8 33.2 4875.01 N .
3187
91 E
11250.00 32.94 40.63 N 40 38 E 0.24 8972.14. 5838.3 33.2 4885.35 N .
3196
80 E
11275.00 32.59 40.29 N 40 17 E 0.40 8993.17 5851.8 33.2 4895.64 N .
3205
58 E
11300.00 32.17 40.21 N 40 12 E 0.42 9014.28 5865.0 33.2 4905.86 N .
3214.23 E
11325.00 31.91 40.05 N 40 3 E 0.28 9035.47 5878.2 33.2 4916.00 N 3222
78 E
11350.00 31.49 39.93 N 39 56 E 0.42 9056.74 5891.3 33.3 4926.07 N .
3231
23 E
11375.00 31.39 39.57 N 39 34 E 0.22 9078.07 5904.2 33.3 4936.09 N .
3239.56 E
11400.00 31.07 39.49 N 39 29 E 0.33 9099.45 5917.1 33.3 4946.09 N 3247
81 E
11425.00 30.85 39.35 N 39 21 E 0.23 9120.88 5929.9 33.3 4956.03 N .
3255.98 E
19
A Gyrodata Directional Survey
B.P. Exploration (Alaska) Inc
Lease: J-PAD Well: J-13
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK0608G 133
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH B EARING SEVERITY DEPTH DIST. AZIMUTH COOR DINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
25 ft.
11450.00 30.61 39.30 N 39 18 E 0.24 9142.37 5942.6 33.3 4965.91 N 3264.08 E
11475.00 30.54 39.14 N 39 9 E 0.11 9163.90 5955.2 33.3 4975.76 N 3272.12 E
11500.00 30.31 39.06 N 39 4 E 0.23 9185.46 5967.8 33.3 4985.58 N 3280.10 E
11525.00 30.20 38.85 N 38 51 E 0.15 9207.05 5980.4 33.4 4995.38 N 3288.02 E
11550.00 30.05 38.72 N 38 43 E 0.17 9228.67 5992.9 33.4 5005.16 N 3295.88 E
11575.00 29.90 38.64 N 38 38 E 0.16 9250.33 6005.3 33.4 5014.91 N 3303.69 E
11577.28 29.93 38.65 N 38 39 E 0.34 9252.31 6006.4 33.4 5015.80 N 3304.40 E
Final Station Closure: Distance: 6006.44 ft Az: 33.38 deg.
20
B.P. Exploration (Alaska) Inc Interp Inrun
-Well: J-PAD J-13 Gyrodata
Location: Wellhead, Prudhoe Bay, Alaska nun~nQr_ , ~~ r,~cTnir-rT~~~
500
450
400
350(
300(
.-.
w
C~
z
= 250(
O
z
2000
1500
1000
500
0
•
C:
FASTING (ft)
B.P. Exploration (Alaska} Inc
-Well: J-PAD J-13
Location: Wellhead, Prudhoe Bay, Alaska
5.0
4.!
4.(
3.~
w
N
~ 3.C
a~
-v
.~
w 2.5
w
C7
~ 2.0
C~
O
1.5
1.0
0.5
0.0
Interp Inrun
Gyrodata
AK0608G 133 DEFTNiTTVF
B OM HC
M :11577.
•
•
-~~~ --~~~ ~~~~ ~~~~ ~~~~ ~~~~ i~w rsuuu yuuu 10000 11000 12000 13000
MEASURED DEPTH (ft)
B.P. Exploration (Alaska) Inc
Well: )-PAD )-13
Interp Inrun
Gyrodata
AK0608G 133 DEFINITIVE
6(
5~
5(
4~
4C
z
~ 35
H
z
v 30
z
25
20
15
10
5
0
TED
•
•
y~~~ ~~~~ ~~~~ ~rvvv ~uvu ouuu iuuu tsuuu y000 10000 11000 12000 13000
MEASURED DEPTH (ft)
N
Q
B.P. Exploration (Alaska) Inc
Weil: J-PAD J-13
Location: Wellhead. Prudhoe Bav. Alaska
40
20
0
340
320
300.
280,
260,
240.
220.
200.
180.
160.
140.
120.
100.
Interp Inrun
Gyrodata
AK0608G_133 DEFINITIVE
0~-
o-I-
`O-I-
0
0
D~
rTOM H LE
;ATE D
11577. 8
~ luuv cuvu suvu ~+uuu buuu buuu ~uUU tfUUU 9000 10000 11000 12000 13000
MEASURED DEPTH (ft)
•
Survey QC - RGS-CT Acceptance Sheet
~..~.~..
FIELD AND SIIRVFV rNFnRMerrnN
Operator BP EXPLORATION (ALASKA) INC
Fieid~/ Platform
Weli Number ] -PAD J - 13
Survey section From 2383.00 ft. to 11551.00 ft.
Date 9/ 11/ 2008
Gyrodata Job No AK0608G_133
Gyrodata Surveyors Steve Thompson
]ob Objective High Accuracy Gyro Survey
SURVEY PFR FnRMeN(^F
In Spec'
QC Parameter Yes/No/NA Possible Actions
Operational temperature within
Yes Contact Duty Engineer to discuss options:
1. Recalibrate tool to higher temperature
specification 2. Resurvey with backup tool
3. Resurvey 'Hot' section at higher speed
Roll test data within specification Contact Duty Engineer to discuss options:
Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey
2. Resurve with backu tool
Continuous initialisation within Take new initialisation, after three failures:
specification Yes 1. Contact Duty Engineer or,
2. Resurve with backu tool.
Toolface rate within specification
Yes Contact Duty Engineer to discuss options:
Resurvey section from previous bias check
Investi ate and comment if effects are ne li ible
Contact Duty Engineer to discuss options:
-Drift tunes within specification Yes 1. Reprocess with different software settings
2. Resurve with backu tool
Inrun/Outrun comparison within Contact Duty Engineer to discuss options.
specification Yes Resurvey is usually not required if either Inrun or outrun
meet all other C arameters
Depth control within specification Yes Contact Duty Engineer to discuss options.
Action taken:
Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey.
SURVEY ACCEPTED Gyrodata Representative
Client's Representative
SURV-Q366 (OPS SUR-MA-003) 13~" Nov 03 /Revision 12 Page 1 of 1 AK0608G_133
Survey QC - RGS-CT Analysis Sheet
~~
SURVEY QUALITY CONTROL -DATA ANALYSIS
REFERENCE cVCTRnac
Grid S stem Grid Correction 0.00
Azimuth reference: Grid True North TRUE NORTH
Vertical reference: RKB MSL Other If other ive details
TIE ON Dere
De th
Northin s 0.00
0.00 Inclination
Eastin s 0.00
0.00 Azimuth
Latitude 0.00 TVD 0.00
70
3264
Az. Ref: Grid/True Grid Corrected Y N? .
Descri tion
CALIBRATION
Tool Number 6051 Calibration Date 29 Mar 2008
OPERATING TEMPERA
1
INITIALISATION
- Withi
De th A rox 2400.03 No of stns 9 Sec' -Min No. - 6
Azimuth Mean 24.25 Std deviation 0.03 Sec' - Azi SD 0
2°
Inclination Mean 13.53 Std deviation 0.00 .
Sec' -Inc SD 0
1°
Earth Horizontal Rate Mean Abs meas-theor 0.01 Std deviation 0.01 .
Sec' -See 167
DRIFT TUNE
Residual x ro bias Mean -0.000 Std dev' 0.004 Sec's -Mean and SD - 0.333° hr
Residual ro bias Mean 0.000 Std dev' 0.009 Spec's -Mean and SD - 0.333°/hr
TOOLFACE RATE
Maximum toolface rate 16.13 Sec' - 400 sec
IN/OUT CONIPeRTGAN le77' lu in re rnir~ ~~ roe
Inclination Difference Mean 0.15 Std dev' 0.11 Sec's -Casin 0.3° Drill i e 0.3°
Azimuth Difference Mean 0.12 Std dev' 0.18 Sec's -Casin 0.5° Drill i e 0.75°
Lateral Diver ence/1000 1.85 Sec - 5.0 1000
Vertical Diver ence 1000 1.52 Sec' - 2.0/1000
DEPTH Cf1NTRA1
Wireline Com an Schlumber er Line a 15 32 Encoder SF Schlumber er
Max De th TD 11577.3 CCL Corrected Yes
Zero De th Ri u RKB Rezero De th 6
Given u 'oint de th 10193 Measured PJ 10189
Strech cor. At TD divided b TD 1000 .77 Sec' - 1.5 1000
Dif. Between ri u and rezero de the divided b TD 1000
Dif. Between iven and meas de th divided b meas 1000 .51
.35 Sec' - 2.0/1000
Sec' - 2.0 1000
SURV-Q365 (OPS SUR-MA-010) 22n° lan 2004 /Revision 20 Page 1 of 1 AK0608G_133
Survey QC - RGS-CT~pecification Sheet
SURVEY QUALITY CONTROL -SPECIFICATION DATA
INITIALISATION
Gyro Compass
Reading /Station
Raw Inclination
Raw Azimuth
Abs (ERMeas-ERrl,eo)
28 13.53 24.55 0.0448
29 13.53
24.47
0.0501
30 13.53 24.55 0.0419
31 13.53 24.54 0.0293
32 13.53 24.54 0.0567
33 13.53 24.53
0.0617
34 13.53 24.57 0.0753
35 13.53
24.50
0.0657
36 13.53
24.53
0.0796
Average 13.53 24.53
0.0561
Tolerance on Average* 0.0851
Standard Deviation 0.00 0.03 0.0154
Tolerance on St. Dev.** 0.1~ 0.2~ 0.0428
Advanced Initialisation Azimuth
Advanced Initialisation Standard Deviation Tolerance = TBA
* Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * J[(COSA*Sint*0.1)Z+0.Ort2] o/hr
** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/CosI) *J((cosA*SinI*0.1)~+(0.08z/(n-1))] o/hr
DRTFT TI INFC
Drift Tune
Number Ending
Time Ending
Depth Ending
Inclination Ending
Azimuth
Residual Gx Bias
Residual Gy Bias
Start End Start End
1 1503.39 4291.03 42.73 28.59 0.000 0.001 0.001 0.005
2 1457.59 6178.75 40.09 33.79 -0.002 0.003 -0.005 0.010
3 1184.53 7662.12 43.43 33.05 -0.003 0.004 -0.005 0.009
4 1518.37 9562.62 45.74 34,98 -0.005 0.004 -0.012 0.017
5 1670.03 11551.03 29.85 38.65 0.001 0.003 0.000 -0.002
6 638.42 11509.98 29.90 38.22 -0.000 0.001 -0.001 -0.001
7 1457.67 9557.62 45.43 34.72 0.001 0.002 0.000 -0.001
8 1336.32 7664.84 43.27 32.99 0.005 -0.006 0.012 -0.014
9 1123.93 6171.01 39.88 33.72 0.003 -0.005 0.009 -0.010
10 1397.06 4277.55 42.27 28.69 0.003 -0.006 0.009 -0.010
11 1336.28 2383.19 13.78 25.89 -0.000 -0.005 0.001 -0.002
Average 0.000 -0.000 0.001 0.000
Standard Deviation 0.003 0.004 0.007 0.009
Tolerance for both the Average and the Standard Deviation 0.033/hr 0.033/hr 0.033/hr 0.033/hr
INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON
Depth Corrected Inclination Corrected Azimuth
Inrun * Outrun * Difference Inrun * Outrun * Difference
100.00 0.48 0.04 0.44 241.27 358.10 -116.83
SURV-Q367 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 1 of SO AK0608G 133
Survey QC - RGS-CT pecification Sheet
200.00 0.50 0.08 0.42 157.00 356.20 160.80
300.00 0.61 0.37 0.24 193.78 285.37 -91.59
400.00 0.37 0.70 -0.33 177.46 201.43 -23.97
500.00 0.89 0.71 0.18 165.51 183.80 -18.29
600.00 0.47 0.66 -0.18 175.70 178.31 -2.61
700.00 0.34 0.66 -0.33 143.84 148.13 -4.29
800.00 0.52 0.68 -0.17 149.34 113.65 35.69
900.00 0.24 0.55 -0.31 160.56 80.62 79.94
1000.00 0.48 0.39 0.09 114.49 47.84 66.65
1100.00 0.36 0.34 0.02 353.05 72.26 -79.21
1200.00 0.37 0.31 0.06 322.13 105.67 -143.54
1300.00 0.41 0.37 0.04 26.97 35.22. -8.25
1400.00 0.43 0.43 0.00 12.06 311.08 60.97
1500.00 0.39 0.44 -0.06 345.78 267.92 77.86
1600.00 0.09 0.45 -0.36 134.60 229.60 -95.00
1700.00 0.38 0.41 -0.04 289.08 222.53 66.54
1800.00 0.38 0.37 0.01 186.40 218.90 -32.50
1900.00 0.40 0.99 -0.58 156.50 142.48 14.02
2000.00 1.76 1.66 0.09 57.55 58.64 -1.09
2100.00 4.41 4.36 0.05 24.49 33.34 -8.84
2200.00 7.08 7.26 -0.18 10.07 13.77 -3.70
2300.00 10.43 10.42 0.01 17.91 18.48 -0.57
2400.00 13.60 13.60 -0.01 24.67 25.38 -0.71
2425.00 14.65 14.56 0.09 25.95 26.83 -0.88
2450.00 15.59 15.48 0.11 27.15 27.89 -0.74
2475.00 16.13 16.03 0.10 27.79 28.40 -0.61
2500.00 16.87 16.77 0.10 28.20 28.85 -0.65
2525.00 17.69 17.60 0.09 28.76 29.34 -0.59
2550.00 18.28 18.22 0.06 28.94 29.48 -0.55
2575.00 19.25 19.22 0.03 29.06 29.56 -0.50
2600.00 20.58 20.60 -0.02 29.53 29.99 -0.46
2625.00 21.49 21.40 0.09 29.68 30.10 -0.42
2650.00 22.14 21.99 0.14 29.74 30.02 -0.28
2675.00 22.47 22.31 0.16 29.75 30.06 -0.31
2700.00 22.67 22.51 0.15 29.79 30.12 -0.33
2725.00 22.95 22.79 0.16 30.03 30.45 -0.41
2750.00 23.26 23.12 0.14 30.63 31.02 -0.39
2775.00 23.77 23.68 0.09 31.07 31.37 -0.29
2800.00 24.77 24.68 0.09 30.88 31.19 -0.30
2825.00 25.31 25.20 0.12 30.91 31.12 -0.21
2850.00 25.72 25.61 0.11 30.85 31.08 -0.23
2875.00 26.25 26.12 0.13 30.86 31.06 -0.20
2900.00 26.82 26.71 0.11 30.65 30.84 -0.19
2925.00 27.44 27.33 0.12 30.38 30.54 -0.17
2950.00 28.18 28.09 0.08 30.15 30.28 -0.13
SURV-Q367 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page 2 of 10 AK0608G_133
Survey QC - RGS-CT pecification Sheet
~~
Lyl5.00 28.88 28.79 0.09 30.08 30.19 -0
11
3000.00 29.56 29.43 0.13 30.29 30.45 .
-0
16
3025.00 29.99 29.85 0.14 30.20 30.38 .
-0
19
3050.00 30.33 30.17 0.17 30.26 30.44 .
-0.17
3075.00 30.65 30.50 0.15 30.28 30.39 -0.12
3100.00 30.89 30.74 0.15 30.41 30.47 -0
07
3125.00 31.10 30.92 0.17 30.52 30.65 .
-0
13
3150.00 31.41 31.25 0.16 30.52 30.66 .
-0.14
3175.00 31.71 31.55 0.16 30.46 30.56 -0.10
3200.00 32.03 31.88 0.15 30.34 30.43 -0.09
3225.00 32.45 32.29 0.16 30.13 30.22 -0
09
3250.00 32.76 32.61 0.15 30.15 30.22 .
-0
07
3275.00 33.18 33.02 0.16 30.01 30.06 .
-0
05
3300.00 33.60 33.48 0.12 30.01 30.06 .
-0.05
3325.00 34.29 34.20 0.09 29.74 29.76 -0.02
3350.00 35.33 35.24 0.09 29.35 29.33 0.02
3375.00 35.97 35.86 0.11 29.10 29.09 0.02
3400.00 36.56 36.44 0.11 28.86 28.84 0.02
3425.00 37.14 37.00 0.14 28.76 28.75 0.01
3450.00 37.57 37.45 0.12 28.71 28.74 -0.03
3475.00 38.02 37.90 0.12 28.63 28.66 -0.02
3500.00 38.53 38.42 0.11 28.59 28.61 -0.02
3525.00 39.08 38.96 0.13 28.52 28.49 0.03
3550.00 39.69 39.60 0.09 28.41 28.32 0.09
3575.00 40.26 40.13 0.13 28.18 28.14 0.04
3600.00 40.72 40.58 0.14 28.03 28.03 -0.01
3625.00 41.15 41.05 0.10 27.98 27.95 0.03
3650.00 41.59 41.47 0.12 28.00 27.98 0.03
3675.00 42.11 42.02 0.10 28.05 28.03 0.03
3700.00 42.63 42.49 0.14 28.02 27.98 0.04
3725.00 43.03 42.90 0.13 27.99 27.96 0.03
3750.00 43.49 43.37 0.12 27.91 27.91 -0.00
3775.00 43.83 43.68 0.16 27.98 27.94 0.04
3800.00 43.65 43.49 0.15 27.78 27.73 0.05
3825.00 43.77 43.60 0.17 27.74 27.71 0.03
3850.00 43.91 43.76 0.16 27.76 27.71 0.06
3875.00 44.02 43.83 0.20 27.81 27.75 0.06
3900.00 43.95 43.75 0.19 27.76 27.73 0.03
3925.00 43.75 43.60 0.15 27.69 27.63 0.06
3950.00 43.70 43.48 0.22 27.65 27.63 0.02
3975.00 43.63 43.46 0.18 27.71 27.68 0.03
4000.00 43.58 43.41 0.17 27.66 27.61 0.04
4025.00 43.62 43.39 0.22 27.71 27.66 0.04
4050.00 43.33 43.13 0.20 27.69 27.65 0.04
4075.00 43.28 43.10 0.18 27.66 27.62 0.04
SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 3 of 30 AK0608G 133
Survey QC - RGS-CT~pecification Sheet
4100.00 43.51 43.36 0.15 27.69 27.66 0
03
4125.00 43.70 43.53 0.17 27.60 27
61 .
-0
01
4150.00 43.64 43.44 0.20 27.66 .
27.62 .
0
04
4175.00 43.46 43.26 0.20 27.72 27.66 .
0.06
4200.00 43.29 43.11 0.17 27.73 27.69 0
04
4225.00 43.16 42.93 0.23 27.88 27.87 .
0
01
4250.00 42.88 42.67 0.22 28.14 28.14 .
-0
00
4275.00 42.63 42.45 0.18 28.47 28.45 .
0
02
4300.00 42.57 42.35 0.22 28.55 28.54 .
0.01
4325.00 42.43 42.22 0.22 28.73 28.69 0
04
4350.00 42.49 42.30 0.19 28.74 28.69 .
0
04
4375.00 42.50 42.26 0.24 28.67 28.59 .
0
08
4400.00 42.38 42.17 0.21 28.92 28.88 .
0
04
4425.00 42.05 41.86 0.19 29.00 28.99 .
0.01
4450.00 42.24 42.03 0.21 28.98 28.93 0
05
4475.00 42.38 42.17 0.21 29.01 28.94 .
0
07
4500.00 42.02 41.77 0.24 29.09 29.02 .
0
07
4525.00 41.99 41.80 0.20 29.10 29.05 .
0
06
4550.00 42.02 41.84 0.18 29.08 29.01 .
0.07
4575.00 42.16 41.92 0.24 29.14 29.08 0
06
4600.00 41.95 41.72 0.23 29.06 28.97 .
0
09
4625.00 41.82 41.62 0.20 29.07 28.99 .
0
07
4650.00 41.68 41.46 0.22 29.21 29.07 .
0
14
4675.00 41.76 41.57 0.19 29.22 29.15 .
0.07
4700.00 41.73 41.49 0.23 29.36 29.32 0
05
4725.00 41.49 41.27 0.22 29.54 29.47 .
0
07
4750.00 41.46 41.26 0.20 29.91 29.86 .
O
dS
4775.00 41.17 40.96 0.21 30.22 30.16 .
0
05
4800.00 41.09 40.87 0.21 30.44 30.37 .
0.07
4825.00 40.98 40.76 0.22 30.60 30.50 0
11
4850.00 40.72 40.54 0.18 30.72 30.64 .
0
08
4875.00 40.70 40.46 0.24 30.73 30.61 .
0
12
4900.00 40.72 40.54 0.18 30.86 30.76 .
0.10
4925.00 40.64 40.40 0.24 30.92 30.80 0.12
4950.00 40.56 40.36 0.20 30.87 30.83 0
05
4975.00 40.66 40.49 0.17 30.99 30.87 .
0
13
5000.00 40.58 40.35 0.22 31.00 30.87 .
0.13
5025.00 40.56 40.37 0.20 30.98 30.89 0.09
5050.00 40.54 40.34 0.20 31.03 30.88 0.15
5075.00 40.36 40.15 0.21 30.96 30.82 0.14
5100.00 40.37 40.18 0.19 31.13 31.02 0.11
5125.00 40.40 40.24 0.16 31.23 31.11 0.12
5150.00 40.33 40.13 0.20 31.16 31.01 0.15
5175.00 40.25 40.03 0.23 31.22 31.11 0.11
5200.00 39.89 39.70 0.20 31.21 31.08 0.13
SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 4 of 30 AK0608G 133
Survey QC - RGS-CT Specification Sheet
_~
5225.00 40.03 39.86 0.16 31.27 31.14 0.13
5250.00 40.07 39.87 0.20 31.25 31.15 0.10
5275.00 39.95 39.74 0.21 31.19 31.07 0.11
5300.00 39.58 39.38 0.21 31.26 31.14 0.12
5325.00 39.51 39.34 0.18 31.32 31.20 0.12
5350.00 39.37 39.18 0.19 31.38 31.28 0.11
5375.00 39.37 39.18 0.19 31.58 31.46 0.12
5400.00 39.20 39.02 0.18 31.90 31.79 0.11
5425.00 39.33 39.19 0.15 32.07 31.97 0.10.
5450.00 39.47 39.26 0.21 32.05 31.93 0.12
5475.00 39.24 39.06 0.18 32.23 32.12 0.11
5500.00 39.14 38.96 0.19 32.23 32.15 0.08
5525.00 39.24 39.03 0.21 32.47 32.36 0.12
5550.00 39.13 38.95 0.18 32.47 32.35 0.12
5575.00 38.96 38.74 0.22 32.81 32.73 0.07
5600.00 38.82 38.64 0.19 33.22 33.10 0.12
5625.00 38.81 38.61 0.20 33.79 33.70 0.09
5650.00 38.93 38.73 0.20 34.14 34.02 0.12
5675.00 38.93 38.74 0.19 34.14 34.05 0.10
5700.00 38.93 38.74 0.19 34.15 34.06 0.09
5725.00 38.94 38.74 0.20 34.21 34.13 0.07
5750.00 39.14 38.96 0.18 34.22 34.12 0.10
5775.00 39.37 39.20 0.18 34.26 34.17 0.09
5800.00 39.45 39.25 0.20 34.19 34.12 0.07
5825.00 39.29 39.10 0.19 34.26 34.14 0.12
5850.00 39.48 39.28 0.19 34.30 34.22 0.08
5875.00 39.66 39.47 0.20 34.37 34.29 0.08
5900.00 39.74 39.55 0.19 34.35 34.27 0.08
5925.00 39.74 39.54 0.20 34.29 34.22 0.07
5950.00 39.71 39.52 0.19 34.29 34.20 0.09
5975.00 39.54 39.35 0.20 34.19 34...11 0.08
6000.00 39.67 39.48 0.19 34.17 34.09 0.08
6025.00 39.79 39.59 0.20 34.10 34.02 0.07
6050.00 39.63 39.44 0.20 34.17 34.11 0.06
6075.00 39.63 39.43 0.20 34.10 34.03 0.07
6100.00 39.77 39.56 0.20 34.03 33.97 0.06
6125.00 39.80 39.60 0.20 33.95 33.91 0.04
6150.00 39.84 39.65 0.20 33.96 33.91 0.05
6175.00 39.89 39.69 0.21 33.88 33.85 0.03
6200.00 39.91 39.70 0.21 33.84 33.81 0.03
6225.00 40.09 39.89 0.20 33.73 33.72 0.02
6250.00 40.02 39.79 0.23 33.73 33.71 0.02
6275.00 40.13 39.88 0.24 33.80 33.74 0.06
6300.00 39.86 39.68 0.19 33.72 33.68 0.03
6325.00 39.72 39.48 0.24 33.71 33.67 0.03
SURV-Q167 (OPS SUR-MA-003) 19`h Nov 03 /Rev 15 Page 5 of SO AK0608G_333
Survey QC - RGS-CT pecification Sheet
.~~
o3~u.uu .iy.y~i 39.69 0.24 33.66 33.60 0
06
6375.00 40.45 40.19 0.26 33.70 33.69 .
0
01
6400.00 40.71 40.47 0.24 33.55 33.49 .
0
06
6425.00 40.96 40.70 0.26 33.37 33.29 .
0.08
6450.00 41.06 40.85 0.21 33.41 33.37 0
04
6475.00 40.89 40.66 0.22 33.41 33.32 .
0
09
6500.00 40.93 40.69 0.24 33.35 33.29 .
0
05
6525.00 41.11 40.89 0.22 33.35 33
28 .
0
07
6550.00 41.31 41.07 0.24 33.35 .
33.31 .
0.04
6575.00 41.33 41.10 0.23 33.35 33.26 0
09
6600.00 41.24 41.02 0.22 33.48 33.41 .
0
07
6625.00 41.47 41.22 0.24 33.49 33.42 .
0
08
6650.00 41.45 41.26 0.20 33.55 33.47 .
0
09
6675.00 41.48 41.28 0.20 33.41 33.33 .
0.08
6700.00 41.42 41.18 0.24 33.44 33.33 0
10
6725.00 41.70 41.47 0.23 33.53 33.44 .
0
09
6750.00 41.95 41.75 0.20 33.41 33.30 .
0
11
6775.00 41.70 41.51 0.20 33.49 33.38 .
0
11
6800.00 41.50 41.32 0.18 33.56 33.43 .
0.13
6825.00 41.67 41.43 0.24 33.46 33.36 0
09
6850.00 41.89 41.65 0.24 33.55 33.42 .
0
14
6875.00 41.83 41.64 0.19 33.50 33.35 .
0
14
6900.00 41.70 41.47 0.23 33.61 33.47 .
0
14
6925.00 41.43 41.22 0.21 33.66 33.53 .
0.14
6950.00 41.46 41.25 0.20 33.70 33.58 0.11
6975.00 41.50 41.27 0.24 33.73 33.60 0.14
7000.00 41.32 41.13 0.19 33.68 33.61 0.07
7025.00 41.33 41.12 0.21 33.66 33.60 0.06
7050.00 41.25 41.03 0.23 33.73 33.60 0.13
7075.00 41.33 41.12 0.22 33.75 33.63 0.11
7100.00 41.31 41.12 0.19 33.79 33.66 0.13
7125.00 41.12 40.89 0.23 33.79 33.67 0.12
7150.00 40.93 40.78 0.15 33.72 33.59 0.14
7175.00 41.08 40.83 0.24 33.78 33.65 0.13
7200.00 41.02 40.78 0.24 33.76 33.68 0.08
7225.00 41.06 40.90 0.17 33.82 33.67 0.14
7250.00 41.02 40.80 0.22 33.79 33.69 0.11
7275.00 40.90 40.66 0.25 33.81 33.71 0.11
7300.00 41.01 40.78 0.23 33.90 33.75 0.14
7325.00 41.03 40.79 0.24 33.85 33.71 0.15
7350.00 40.90 40.68 0.21 33.82 33.72 0.10
7375.00 41.12 40.83 0.28 33.82 33.61 0.20
7400.00 41.34 41.07 0.26 33.63 33.55 0.07
7425.00 41.39 41.16 0.23 33.38 33.27 0.11
7450.00 41.67 41.43 0.25 33.40 33.27 0.14
SURV-Q367 (OPS SU R-MA-003) 19th Nov 03 /Rev iS Page 6 of 30 AK0608G 133
Survey QC - RGS-CT pecification Sheet
i4i5.uu 41.91 41.64 0.27 33.26 33.17 0
09
7500.00 42.04 41.81 0.23 33.15 33.01 .
0
14
7525.00 42.31 42.05 0.26 33.18 33.03 .
0
15
7550.00 42.27 42.02 0.25 33.12 33.00 .
0.13
7575.00 42.55 42.32 0.23 33.21 33.12 0
09
7600.00 42.86 42.60 0.26 33.10 32.94 .
0
16
7625.00 42.91 42.65 0.25 33.02 32.90 .
0
12
7650.00 43.01 42.78 0.22 33.07 32.93 .
0
14
7675.00 43.40 43.12 0.28 33.08 32.95 .
0.13
7700.00 43.40 43.17 0.24 33.03 32.92 0
11
7725.00 43.59 43.36 0.24 33.02 32.94 .
0
08
7750.00 43.74 43.46 0.28 33.08 32.94 .
0
14
7775.00 43.83 43.62 0.21 33.08 32.97 .
0
11
7800.00 44.02 43.81 0.21 33.07 32.91 .
0.16
7825.00 44.01 43.77 0.24 33.14 32.98 0
16
7850.00 43.95 43.74 0.21 33.24 33.07 .
0
18
7875.00 44.08 43.88 0.20 33.47 33.31 .
0
17
7900.00 44.03 43.82 0.21 33.60 33.40 .
0
20
7925.00 43.92 43.74 0.18 33.92 33.78 .
0.14
7950.00 44.06 43.83 0.23 34.09 33.90 0
19
7975.00 44.05 43.81 0.25 34.37 34.14 .
0
23
8000.00 44.17 43.98 0.20 34.51 34.34 .
0
17
8025.00 44.50 44.26 0.24 34.64 34.45 .
0
19
8050.00 44.85 44.58 0.27 34.69 34.53 .
0.16
8075.00 45.31 45.07 0.24 34.74 34.53 0
21
8100.00 45.95 45.68 0.26 34.80 34.61 .
0
19
8125.00 46.48 46.13 0.34 34.96 34.70 .
0
25
8150.00 47.48 47.23 0.24 35.01 34.82 .
0
19
8175.00 48.41 48.08 0.32 35.09 34.88 .
0.21
8200.00 49.20 48.86 0.34 35.09 34.82 0
27
8225.00 50.18 49.95 0.24 35.08 34.85 .
0.23
8250.00 50.94 50.65 0.29 35.03 34.85 0
19
8275.00 51.67 51.43 0.23 35.12 34.89 .
0.23
8300.00 52.44 52.21 0.24 35.15 34.90 0.25
8325.00 53.08 52.78 0.30 35.22 34.97 0.25
8350.00 53.73 53.50 0.23 35.18 34.89 0.29
8375.00 54.58 54.32 0.26 35.26 35.02 0.25
8400.00 55.26 54.98 0.28 35.23 34.97 0.26
8425.00 56.06 55.85 0.22 35.23 34.98 0.25
8450.00 57.04 56.76 0.28 35.16 34.89 0.27
8475.00 57.88 57.60 0.28 35.24 34.98 0.26
8500.00 58.53 58.32 0.21 35.33 35.00 0.32
8525.00 59.37 59.10 0.27 35.18 34.91 0.27
8550.00 59.87 59.64 0.23 35.26 34.94 0.33
8575.00 60.55 60.36 0.19 35.35 35.05 0.30
SURV-Q367 (OPS SUR-MA-003) 19`h Nov 03 /Rev 15 Page 7 of 10 AK0608G_333
Survey QC - RGS-CT pecification Sheet ~-
~.~
8600.00 61.05 60.84 0.20 35.24 34.94 0.30
8625.00 60.98 60.83 0.15 35.09 34.79 0.30
8650.00 60.90 60.75 0.15 35.05 34.78 0
27
8675.00 60.75 60.61 0.15 35.11 34.78 .
0.33
8700.00 60.49 60.37 0.11 35.11 34.82 0.29
8725.00 60.43 60.26 0.16 35.00 34.70 0.30
8750.00 60.14 59.98 0.16 34.97 34.65 0.32
8775.00 59.87 59.76 0.11 35.01 34.70 0
32
8800.00 59.77 59.64 0.14 35.06 34.72 .
0.34
8825.00 59.66 59.51 0.16 35.14 34.84 0.30
8850.00 59.41 59.34 0.08 35.12 34.83 0.29
8875.00 59.36 59.19 0.17 35.05 34.76 0.29
8900.00 58.98 58.87 0.11 34.96 34.65 0.31
8925.00 58.06 58.02 0.04 35.19 34.85 0.34
8950.00 56.63 56.61 0.02 35.43 35.13 0.31
8975.00 55.37 55.29 0.08 35.56 35.27 0.29
9000.00 54.23 54.11 0.12 35.33 35.05 0.28
9025.00 53.29 53.18 0.11 35.05 34.73 0.32
9050.00 52.45 52.42 0.04 35.26 34.92 0.35
9075.00 51.06 51.01 0.04 35.57 35.17 0.40
9100.00 49.50 49.42 0.08 35.75 35.44 0.30
9125.00 48.14 48.09 0.05 35.96 35.65 0.31
9150.00 47.44 47.32 0.12 36.27 36.04 0.23
9175.00 47.09 46.93 0.16 36.18 36.00 0.18
9200.00 46.79 46.68 0.11 35.88 35.66 0.22
9225.00 46.83 46.63 0.20 35.92 35.68 0.24
9250.00 46.85 46.66 0.19 35.86 35.64 0.23
9275.00 46.93 46.74 0.19 35.84 35.61 0.22
9300.00 46.93 46.76 0.18 35.67 35.52 0.15
9325.00 46.88 46.70 0.18 35.68 35.40 0.28
9350.00 46.70 46.50 0.20 35.84 35.66 0.18
9375.00 46.77 46.57 0.19 35.76 35.55 0.20
9400.00 46.49 46.31 0.19 35.85 35.61 0.24
9425.00 46.23 46.06 0.17 35.68 35.42 0.26
9450.00 46.21 46.00 0.21 35.74 35.51 0.22
9475.00 46.08 45.88 0.20 35.58 35.41 0.18
9500.00 46.11 45.91 0.20 35.38 35.12 0.26
9525.00 46.21 45.99 0.22 35.28 35.06 0.22
9550.00 46.01 45.82 0.20 35.35 35.14 0.21
9575.00 46.11 45.92 0.20 35.34 35.13 0.21
9600.00 45.86 45.65 0.21 35.11. 34.92 0.19
9625.00 45.33 45.17 0.16 34.84 34.65 0.19
9650.00 44.34 44.15 0.20 34.90 34.73 0.17
9675.00 43.42 43.20 0.22 35.05 34.88 0.18
9700.00 42.87 42.62 0.25 35.13 35.02 0.10
SURV-Q167 (OPS 5UR-MA-003) 19v' Nov 03 /Rev 15 Page 8 of 10 AK0608G 133
Survey QC - RGS-CT Specification Sheet /
7/~5.uu 42.85 42.61 0.24 34.69 34.57 0
13
9750.00 42.66 42.41 0.26 34.92 34.70 .
0
22
9775.00 42.67 42.42 0.25 35.05 34.92 .
0
12
9800.00 42.64 42.37 0.26 34.63 34.50 .
0.13
9825.00 42.62 42.35 0.27 34.44 34.31 0
12
9850.00 42.67 42.44 0.23 34.11 33.97 .
0
14
9875.00 42.57 42.34 0.24 34.16 33.99 .
0
17
9900.00 42.46 42.22 0.24 34.15 34.02 .
0
13
9925.00 42.53 42.28 0.24 34.22 34.05 .
0.16
9950.00 42.56 42.32 0.24 34.28 34.11 0
17
9975.00 42.34 42.08 0.26 34.38 34.23 .
0
15
10000.00. 42.55 42.33 0.22 34.26 34.17 .
0
09
10025.00 42.46 42.20 0.26 34.54 34.34 .
0
20
10050.00 42.31 42.08 0.23 34.78 34.61 .
0.18
10075.00 42.48 42.24 0.24 34.99 34.85 0
14
10100.00 42.42 42.16 0.26 34.95 34.84 .
.0
11
10125.00 42.39 42.17 0.22 34.93 34.69 .
0
24
10150.00 42.40 42.13 0.27 35.44 35.24 .
0
20
10175.00 42.45 42.17 0.28 35.31 35.20 .
0.11
10200.00 42.55 42.34 0.21 35.01 34.90 0
11
10225.00 42.37 42.14 0.22 35.38 35.21 .
0
17
10250.00 42.53 42.25 0.28 35.26 34.94 .
0
32
10275.00 42.09 42.06 0.02 35.14 34.73 .
0
41
10300.00 42.11 42.10 0.00 35.48 35.08 .
0.40
10325.00 42.14 42.13 0.01 35.51 35.12 0.40
10350.00 42.05 42.00 0.05 35.50 35.16 0.34
10375.00 42.02 41.77 0.26 35.66 35.33 0.32
10400.00 41.91 41.90 0.01 35.79 35.48 0.30
10425.00 41.63 41.61 0.02 35.84 35.51 0.33
10450.00 41.70 41.64 0.06 35.96 35.63 0.33
10475.00 41.70 41.66 0.04 35.88 35.57 0.31
10500.00 41.51 41.50 0.01 35.87 35.53 0.34
10525.00 41.48 41.44 0.04 36.26 35.92 0.34
10550.00 41.40 41.38 0.03 36.54 36.21 0.33
10575.00 41.25 41.22 0.03 36.72 36.39 0.32
10600.00 41.26 41.21 0.05 36.97 36.63 0.34
10625.00 41.13 41.12 0.01 37.04 36.74 0.31
10650.00 41.05 41.01 0.05 36.97 36.68 0.29
10675.00 40.68 40.69 -0.01 37.06 36.67 0.38
10700.00 40.36 40.35 0.01 37.24 36.91 0.33
10725.00 40.11 40.11 0.00 37.44 37.11 0.33
10750.00 39.75 39.75 0.00 37.49 37.16 0.33
10775.00 39.68 39.63 0.05 37.43 37.09 0.35
10800.00 39.65 39.56 0.10 37.96 37.66 0.30
10825.00 39.11 39.14 -0.02 39.05 38.57 0.48
SURV-Q367 (OPS SU R-MA-003) 19th Nov 03 /Rev 1S Page 9 of 10 AK0608G 133
r
Survey QC - RGS-CT Specification Sheet
luu~u.uu 38.33 38.40 -0.07 40.48 39.97 0
52
10875.00 37.55 37.60 -0.06 41.77 41
31 .
0
47
10900.00 37.25 37.20 0.05 42.19 .
41.85 .
0
34
10925.00 36.95 36.99 -0.04 41.91 41.63 .
0.28
10950.00 36.74 36.74 0.00 41.65 41.38 0
28
10975.00 36.23 36.27 -0.04 41.60 41.28 .
0
32
11000.00 35.82 35.81 0.01 41.53 41.22 .
0
31
11025.00 35.43 35.44 -0.01 41.42 41.12 .
0
30
11050.00 34.99 35.01 -0.02 41.37 41.06 .
0.32
11075.00 34.79 34.78 0.01 41.35 40.99 0
36
11100,00 34.46 34.49 -0.03 41.23 40.92 .
0
31
11125.00 34.40 34.34 0.06 41.21 40.88 .
0
33
11150.00 34.01 34.01 0.01 41.13 40.83 .
0
30
11175.00 33.91 33.85 0.05 40.97 40.69 .
0.29
11200.00 33.55 33.53 0.01 41.01 40.72 0
30
11225.00 33.17 33.20 -0.03 40.78 40.48 .
0
29
11250.00 32.94 33.00 -0.05 40.63 40.30 .
0
34
11275.00 32.59 32.63 -0.04 40.29 39.97 .
0
32
11300.00 32.17 -32.23 -0.05 40.21 39.82 .
0.39
11325.00 31.91 31.99 -0.08 40.05 39.70 0
34
11350.00 31.49 31.55 -0.05 39.93 39.60 .
0
33
11375.00 31.39 31.43 -0.04 39.57 39.26 .
0
31
11400.00 31.07 31.14 -0.08 39.49 39.15 .
0
34
11425.00 30.85 30.87 -0.02 39.35 38.99 .
0.36
11450.00 30.61 30.66 -0.05 39.30 38.91 0
39
11475.00 30.54 30.57 -0.03 39.14 38.81 .
0.33
11500.00 30.31 30.32 -0.01 39.06 38.69 0
37
.11525.00 30.20 30.29 -0.09 38.85 38.53 .
0
32
11550.00 30.05 30.07 -0.02 38.72 38.35 .
0.37
11575.00 29.90 29.87 0.02 38.64 38.24 0.40
Average 0.1521 0.1229
Standard Deviation 0.1130 0.1777
Tolerance for both the Average and the Standard Casing 0.3~ Casing 0.5~
Deviation Drill i e 0.3~ Drill i e 0
75
* Tnrlinnt•inn ~...1 n-.:......rte .
_ ___ _.._ .._....__.........',.....~.... w ~wnc ucNu~~ as ~n~wn.
SURV-Q367 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page SO of SO AKO608G 133
• •
ALL L
_ ~`~AII~v~l1/TT~4L
`~. ,_
ProActive Diagnostic Services, Inc.
To: AOGCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 793-1225
~{~.~~~~ MAY ~ 200
RE : Cased Hole/Open Hole/Mechanical Logs and/arTubing Inspection(Caliper/ MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning
a signed copy of this transmittal letter to the following
BP Exploration (Alaska), Inc.
Petrotechnical Data Center
Attn: Joe Lastufka
LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
and
ProActive Diagnostic Services, Inc.
Attn:: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax. (907) 245-8952
i~~ -a~ 3
(p~~S~o
1) Gradient Survey 01-May-08 J-13
2)
Signed
Print Name: ~~ ' R.~! / 1 l~.l~t.~ jl-~-e-,
1 Color Log / E~ 50-029-20497-00
Date
PROACTNE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAX: (907)245-88952
E-MAIL: .~s~~s:~s€~a~~Cet~3'Sa~r9'sea~~~6oq.L3~a WEBSITE:~+v*u,r7se~439~<<an+~.~~ads
C:tDocuments and SetlingstOwner\Desktop\Trmismit_BP.doc
,.. STATE OF ALASKA ~~ ~~
ALA OIL AND GAS CONSERVATION COMf~ION
REPORT OF SUNDRY WELL OPERATIONS
,~,>,~ ~ 5 2008
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ ~11~ l~='S (_;,~~;g, ommf
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time xtension
~C(lui uy+r
Change Approved Program ~ Operat. Shutdown Perforate Q Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~' Exploratory {~'i iso-os3o
3. Address: P.O. Box 196612 Stratigraphic ! Service ~'. 6. API Number.
Anchorage, AK 99519-6612 50-029-20497-00-00
7. KB Elevation (ft): 9. Well Name and Number:
69.1 KB ~ PBU J-13 ,
8. Property Designation: 10. Field/Pool(s):
ADLO-028281 ~ PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 11800 ~ feet Plugs (measured) None
true vertical 9465.19 ~ feet Junk (measured) 11646
Effective Depth measured 11749 feet
true vertical 9419 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 28 - 108 28 - 108 1490 470
Production 10754 9-5/8" 47# N-80 26 - 10780 26 - 8607.7 6870 4760
Liner 1530 7" 29# L-80 10265 - 11795 8220.17 - 9460.8 8160 7020
Surface 2641 13-3/8" 72# L-80 29 - 2670 26 - 2653 4930 2670
~(~~~I~E® MAY ~ 200'8
Perforation depth: Measured depth: SEE ATTACHMENT - _ _ _ _
True Vertical depth: _ _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 10226 - 10333
7" 26# L-80 SURFACE - 10226
Packers and SSSV (type and measured depth) 9-5/8" DV Packer 2603
7" Guiberson Polar Packer 10226
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured): ~' ~,~~ ~ ~ ~~0~
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 702 27890 606 2049
Subsequent to operation: SHUT-IN
14. Attachments: 15. Well Class after proposed work'
Copies of Logs and Surveys Run Exploratory ~ Development ~ Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil Gas WAG ~' GINJ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Prebl Title Data Management Engineer
Signature Phone 564-4944 Date 4/14/2008
Form 10-404 Revised 04/2006 ~ y ~~~ ~ Submit Original Only
lion
J-13
180-0830
PERF ATTCHMENT
MDT MDB NDt TVDB 3/26/1981 4/20/1981 5/2/1981 12/30/1988 1/16/1989 8/18/1990 8/23/1990 8/16/2007 8/17/2007 9/2/2007 4/8/2008
11,146 11,168 8,903.00 8,921.00 PER RPF SQZ SQZ SQZ SQZ
RPF
11,178 11,198 8,929.00 8,946.00 PER RPF SQZ SQZ SQZ SQZ
RPF
11,208 11,238 8,954.00 8,988.00 PER RPF SQZ SQZ SQZ SQZ
RPF
11,248 11,278 8,988.00 9,013.00 PER RPF SQZ SQZ SQZ SQZ
RPF
11,293 11,308 9,026.00 9,039.00 RPF RPF
11,293 11,310 9,026.00 9,040.00 APF SQZ RPF SQZ SQZ
11,308 11,310 9,039.00 9,040.00 SOZ
AB ABANDO NED PER PERF
APf
ADD PERF
RPF
REPERF _
BPP BRIDGE PLUG PU LLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOV ED
FCO FILL CLEAN OUT SPS SAND PLUG SET ~
FIL
FILL
SOF
SQUEEZE FAILED _
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
M1S MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK
MECHANICAL LEAK
STO _
STRADDLE PACK, OPEN
OH OPEN HOLE
•
•
•
J-13
DESCRIPTION OF WORD COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTiVfTYDATE~ ;: .:, SUMMARY .::
_. ...
4/3/2008' Service swab for Pre S/L
4/6/2008 TII/0= 350/20/0. Temp= SI. tubing & lA PLs (pre-N2 lift). A/L disconnected.
Tl3G FL ®1830' (46 bbls). IA 6'L @ surface.
4/6l2008:CTU #9; 1.50" Cail. Job Scope: N2 Lift. MiRU. Pump 1.0" ball for drift of coil.
Perform BOP test. RIH with 1.75" JSN. Begin lifting at 3000' ctmd with 750
scf/min N2. Increase rate to 1000scf/min and park coil at 4500' ctmd.
Incrementally deepen lift point to 6200' ctmd as well production slugs; park coil
at this depth and lift well at 1000 sc#/min N2 rate. Continued on WSR 04/07/08.
4/7/2008~CTU #9 w/ 1.5" OD CT. N2 lift, continued from WSR 04106108. Continue
unloading well at 1000 scf/min N2 rate from 6200' ctmd. Well returns the
liquids from above our nozzle in a slug, then cycles gas at 1:1 with our nitrogen
injection rate. Incrementally deepen lift point to 9800' ctmd; well unloads the
wellbore liquids above our nozzle, then cycles gas 1:1 with our nitrogen
injection rate. Slowly RIH to 11400' while pumping 1000scf/min N2.
Reciprocate between 11400' ctrnd and 9800' c#md while pumping 1000scf/min
N2. Wellbare liquids unloaded, no additional contribution from reservoir noted.
Discuss plan forward with town engineer. At#empt injectivity test with N2.
:Continued on WSR 04/08/08.
4/8/2008`CTU #9 w/ i.5" OD CT. N2 lift, continued from WSR 04107/08. Continue
:injectivity test with N2 - no injectivity achieved. Perform MIT-T to 3000 psi with
N2 against perforations. MIT-T with N2 passed to 3000 psi, losing $ psi in first
fifteen minute interval and $ psi in second fifteen minute interval for a total loss
of 16 psi in 30 minutes. Bleed WHP to 1600 psi and pull to surface. MU and
RIH with SLB GR/CCL memory logging tool for perforation correlation log. Log
.interval 11451' to 11100' ctmd. Paint coil flag. Continue logging to 10900'
ctmd. POOH. Confirm good data. MU 3.50" PJ Omega per€orating gun. RIH
to flag depth. Correct to top shot at coil flag. RIH to perforating depth. Re-.
perforate 11293' - 11308' with 3.50" OD 6 SPF 3506 PJ Omega 72 deg
.'phasing (ref: SWS BRCS 09/28/80). No chancre in WHP upon firing pun.
`Continued on WSR 04/09/08.
4/9/2008 CTU #9 w/ 1.5" OD CT. Pert, continued from WSR 04!08/08. RIH with spent
perf gun to 11430'. Attempt to infect into well Aumpinp 60/40 methanol/water
down tail tubing - no injection achieved. MIT-T passed to 2400 psi, with an
equivalen# bottom-hole pressure of 4200 psi (see job log for details ofi test).
Try to drop spent perf gun on bottom as per program: Attempt to disconnect at
lower Baker disconnect. Unsuccessful disconnecting from lower Baker
disconnect. Attempt to disconnect at upper Baker disconnect. Unsuccessful
~~disconnecting from ugoer Baker disconnect.
:POOH. OOH, Cycle swab from 100' etmd. Secure well. Tag injector stuffing
box with coiled tubing connector. Break lubricator and trolley up with injector.
'Obserue what appears to 3.50" perf gun in BOP's. Perf gun static while picking
up with injector. Suspect disconnected BHA. Call for man basket and SW S
handling equipment. Break lubricator above 8' section and observe uppermost
• •
disconnect parted, with remainder of toolstring below upper disconnect resting
an the swab valve. Recover entire perforating BHA. Recover all balls pumped
:during perforating and disconnect operations. Confirm all shots fired with no
evidence of a low-order detona#ion, Gap well with 10 bbls 60/40
methanoUwater. Begin RD CTU #9. Job complete.
FLUIDS PUMPED
BBLS
249 60/40 METH
5 1 % KCL
254 TOTAL
I STATE OF ALASKA -
ALAS A OIL AND GAS CONSERVATION COM~ION
REPORT OF SUNDRY WELL OPERATIONS
D
D
0<
..
1. Operations Abandon D Repair Well D
Performed: Alter Casing D Pull Tubing D
Change Approved Program D Operat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development
Stratigraphic
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
3. Address:
69.1 KB
8. Property Designation:
ADLO-028281 ,
11. Present Well Condition Summary:
Total Depth measured 11800 ,- feet
true vertical 9465.19 feet
Effective Depth measured 11749 feet
true vertical 9419 feet
Casing Length Size MD
Conductor 80 20" 91.5# H-40 28 - 1 08
Production 10754 9-5/8" 47# N-80 26 - 10780
Liner 1530 7" 29# L -80 10265 - 11795
Surface 2641 13-3/8" 72# L-80 29 - 2670
Perforation depth:
Measured depth: 11293' - 11308'
True Vertical depth: 9026' - 9039'
-
-
~ RECEIVt::U
~.¿)?
SEP 0 7 2007
ion
Stimulate D Other D
Waiver D Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
.^,Rc;¡graQII
Exploratory
Service
180-0830 <'
6. API Number:
50-029-20497-00-00 ~
9. Well Name and Number:
PBU J-13 /
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool
Plugs (measured) None
Junk (measured) 11646' - 11600'
TVD
28 - 1 08
26 - 8607.7
8220.17 - 9460.8
26 - 2653
Burst
1490
6870
8160
4930
Collapse
470
4760
7020
2670
~~NED SEP 2 7 2001
-
-
4-1/2" 12.6# L-80
7" 26# L -80
9-5/8" DV Packer
7" Guiberson Polar Packer
o
o
10226 - 10333
Surface 1022'6"'"''''''
2603
10226
o
o
.,..",¡Ji..
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
27890 606 0
o 0 0
15. Well Class after Droposed work:
Exploratory Development ~
16. Well Status after proposed work:
Oil ~ Gas WAG
Tubing: (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
702
Shut-in
x
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Gary Preble
Tubing pressure
2049
o
Service
W INJ WDSPL
Sundry Number or N/A if C.O. Exempt:
N/A
Title Data Management Engineer
Signature .
Date 9/5/2007
SEP ,2 5 2007
'\ \)1-4,
su~n~7{t7
..
.
.
J-13
DESCRITION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
8/31/2007 *** WELL SHUT IN PRIOR TO ARRIVAL ***(post sqz / pre_perf)
DRIFTED W/2 7/8" X 11' DUMMY GUN, TEL & SAMPLE BAILER
11 ,618'ELM (TARGET DEPTH 11 ,308'MD) - SAMPLE OF FILL
RECOVERED (APPEARED TO BE FORMATION SAND).
*** TURN WELL OVER TO DSO - LEFT WELL SHUT IN***
***WELL IN ARRIV AL***
INITIAL T/I/O = 600/0/0
PERFORATED FROM 11,293' TO 11,308' W/ 2-7/8" HSD POWER
OMEGA HMX CHARGES, 6 SPF.
NOT TAGGED. FINAL T/I/O = 500/0/
SHUT IN UPON DEPARTURE.
***JOB COMPLETE***
FLUIDS PUMPED
BBLS I
1 DI ESEL
1 TOTAL
· STATE OF ALASKA _
ALASKA Oil AND GAS CONSERVATION COM~ION
REPORT OF SUNDRY WELL OPERATIONS
o
o
o
<
1. Operations Abandon 0 Repair Well 0
Performed: Alter Casing 0 Pull Tubing 0
Change Approved Program 0 Operat. Shutdown 0
2. Operator BP Exploration (Alaska), Inc.
Name:
3. Address:
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
69.1 KB
8. Property Designation:
ADLO-028281 -
11. Present Well Condition Summary:
Total Depth
measured 11800
true vertical 9465.19
Effective Depth
measured 11749
true vertical 9419
Casing
Conductor
Production
Liner
Surface
Length
80
10754
1530
2641
Size
20" 91.5# H-40
9-5/8" 47# N-80
7" 29# L-80
13-3/8" 72# L-80
Perforation depth:
Measured depth: All perfs sQueezed -
True Vertical depth: ...:...
Tubing: (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
702
Shut-in
x
~
~ ,-o;Z
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development P .
Stratigraphic
Stimulate 0 Other 0 ACID TREATMENT
WaiverD Time Extension 0 CEMENT SQUEEZE
Re-enter Suspended Well 0
5. Permit to Drill Number:
180-0830
Exploratory
Service
6. API Number:
50-029-20497-00-00 -
9. Well Name and Number:
PBU J-13 ...
feet
feet
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool -.
::Þ
õ)
<n
:0:"'
Q)
S?
;0
m
(')
m
<:
m
o
Plugs (measured)
Junk (measured)
None
11646' - 11600'
J>
c
CJ)
b:)
CX1
C2P
:t>Ci)
:::I Q)
g.CI)
o n
.... 0
Q) :::I
~ CI) f'-)
p:?lIa~
347c¡---.J
34760
¡;;'
!!! 7020
o
:::12670
feet
feet
MD
28 - 108
26 - 10780
10265 - 11795
29 - 2670
TVD
28 - 1 08
26 - 8607.7
8220.17 - 9460.8
26 - 2653
Bu rst
1490
....~D
8160
4930
./
S~ANNED SEP 112007
-
4-1/2" 12.6# L-80
7" 26# L -80
9-5/8" DV Packer
7" Guiberson Polar Packer
o
o
10226 - 10333
Surface 10226'
2603
10226""
o
o
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casing Pressure
27890 606 0
o 0 0
15. Well Class after Proposed work:
Exploratory Development
16. Well Status after proposed work:
Oil P Gas WAG
Tubing pressure
2049
o
Service
WDSPl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
WINJ
Contact Chris Zamora
Form 10-404 Revised 04/2006 0 R
Title Petrouem Engineer
Phone 564-4138
Date 8/27/2007
SEP 1 0 20D7
Submit Original Only
".
. .
.
.
J-13
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
8/15/2007 # 9 w/1.75" (Cement
availability of Equipment.
On Location, Waiting for Rig up and
CTU # 9, Begin continued on 08/17/07 WSR.
8/16/2007 Heat uprights (CTU Prep) Circulated 3 UR's of 1%KCL to increase temperature to
180*F.
CTU# 9 w/1. 75" (squeeze}, Continue from 08/16/07 WSR. Complete rig up. PT
surface equipment. Rig up Cement pumper. Kill well down backside with 650 bbls
1% KCL. Acidize perforations with 50 bbls 12% HCL and 50 bbls 9:1 MUD acid.
Batch mix 60 bbls LARC cement. Lay in cement from flag. Close choke/creep coil
@ 11080'. Get 500 psi bump. Crack choke, lay in reaming cement. Estimated 4.4
bbls behind pipe. From safety, bump to 1500 psi for 10 min's, 2100 psi for 10 min's
and 2300 pSI (2500 DP @ perfs) for 40 min's. Held pressure good @ all steps.
Drop ball. Contiminate from 10,000'-11669' w/ bio, reducing rate to 1 bpm across
perfs. Make 3 down/2 up passes. Begin chase out @ 80%. Continued on 08/18/07
8/18/2007 CTU # 9, from 08/17/07 out @ 80%, making slow repeats
across jewelry. Freeze protect tbg from 2000' w/ water/meth. Trap 900 psi WHP.
BOP's. Recover ball. RDMO. ***** Job Complete****
FLUIDS PUMPED
BBLS
657 1 % KCL
244 1% KCL W/XS
150 1.5# BIO
400 01 ESEL
45 FRESH WATER
60 LARC CEMENT
100 3% NH4CL
50 12% HCL
50 9:1 MUD ACID
1756 TOTAL
.
.
FRANK H. MURKOWSKI, GOVERNOR
AJiASIiA OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE. ALASKA 99501·3539
PHONE (907) 279-1433
FAX (907) 276-7542
Chris Zamora
Pad Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, J-13
Sundry Number: 306-342
~C!\\\\~~~fV
""." 'ô 'lnn\ó,
"'i\ ;> c.,..·.,;;vlj
(y .J;..
Dear Mr. Zamora:
Enclosed is the approved Application for Sundry Approval relating to~e
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Ch
DATED this It) day of October, 2006
Encl.
15ó-()'63
+ J\~v\\~
6f1 ID{to!DÞ "0 loll.}/o(; I "I-Vl-~~o¡'o fl.-DOle,
. STATE OF ALASKA _ 0 CT 0 4 2006
ALASKA OIL AND GAS CONSERVATION COMMIŠ-N
APPLICATION FOR SUNDRY APPROvAfska Oil & Gas Cons. Commission
Anchorage
Abandon
Alter casing D
Change approved program D
2. Operator Name:
BP Exploration (Alaska), Inc.
3. Address: P.O. Box 196612
1. Type of Request:
Suspend
Repair well 0
Pull Tubing D
20 AAC 25.280
Operational shutdown
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Development ø
180-0830 ./
Waiver
Stimulate D Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Number:
Other
Exploratory 0
Stratigraphic 0
/ Service 0 6. API Number:
50-029-20497-00-00 ./
Anchorage, AK 99519-6612
7. KB Elevation (It):
Descriotive Summaryof Proposal ø
Detailed Operations Program 0 BOP Sketch 0
14. Estimated Date for
8. Property Designation:
ADLO-028281
11.
Total Depth MD (It):
11800
Casing
Conductor
Surface
Production
Liner
Perforation Depth MD (It):
11293' - 11310' /
Packers and SSSV Type:
12. Attachments:
Commencing Operations:
16. Verbal Approval:
Commission Representative:
9. Well Name and Number:
69.1 KB
J-13 /
Total Depth TVD (It):
9465.19
10. FieldlPools(s):
PRUDHOE BAY Field / PRUDHOE OIL Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (It): Effective Depth TVD (It): Plugs (measured):
11749' 9419' None
Junk (measured):
11646
Collapse
470
2670
4760
7020
Length Size TVD Burst
80' 20" 91.5# H-40 2S' 108' 28' 108' 1490
2641' 13-3/8" 72# L·80 29' 2670' 29' 2653' 4930
10750' 9-5/8" 47# L-80 30' 10780' 30' 8607' 6870
1531' 7" 29# L-80 10264' 11795' 8219' 9461' 8160
Perforation Depth TVD (It):
9026' - 9040'
Tubing Grade:
L·80
L-80
Tubing MD (It):
31' - 10226' /
10226' - 10333'
Tubing Size:
7" 26#
4-1/2" 12.6#
9-5/S" DV Packer
7" Guiberson Polar Packer
Packers and SSSV MD (It): 2603'
10226'
o 0
o 0
13. Well Class alter proposed work:
Exploratory 0 Development ø
/
/
Service 0
1 /1 2006
15. Well Status alter proposed work:
Oil ø Gas 0 Plugged 0
WAG 0 GINJ 0 WINJ 0
Abandoned 0
WDSPL 0
Date:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Na Title
Contact
Chris Zamora
Pad Engineer
Phone 564-4138 Date
COMMISSION USE ONLY
10/2/2006
Conditions of approval: Notify Commission so that a representative may witness
Sundry Number:
Plug Integrity D
BOP Test Œ('
Mechanical Integrity Test D
Location Clearance D
Other: T ~<;. t 80 r E to ?,':) 00 rCA.5·
Subsequent Form Required:
Approved by:
Form 10-403 Revised 11/2004
RBDMS 8Ft 0 CT I ] 2006
APPROVED BY
THE COMMISSION
Date: If).. /ð ' ().b
NER
¡\li~
Submit in Duplicate
.
.
.
bp
To:
C. Olsen I J. Bixby
Well Operations Supervisor
Date: September 13, 2006
From:
Chris Zamora
J-Pad Engineer
Doug Cismoski
Wells Engineer
Bryan McLellan
Wells Engineer
Subject: J-13 Scab Liner
PBJPDWL 13-N
Est. Cost: $375M
Est. lOR: 675 bopd
Please run a scab liner in 1-13 as per the attached program.
1. S D&T
2. C Sandback wi 1.75" CT (see attached)
3. S D&T sandback top and dump bail cement cap
4. F Liquid pack lA.
5. 0 RU work platform. BOP test.
6. C Run 980' 3.5" chrome scab liner with 2.375" CT
7. F Pressure test liner/lap
8. C Drill out shoe track, reperforate, FCO and N2lift with 1.75" CT
9. EP Reperforate 11,293' - 11,310' MD (if required)
Current Status:
Last Test
Deviation:
Last TO Tag:
Last Well Op:
Min. Restriction:
Latest H2S value:
SI due to high GOR
05/30/06: 1,455 BPD; 2,718 BWPD; 58, 357 MCFPD; 40,12 GOR, 65% WC
43° @ the perfs. Max. dev. is 61 ° @ 8,600' MD
04/30/06: Tagged PBTD at 11,653' corr. MD with bailer (343' rat hole)
05/09/06: PPROF (Gas Entry Survey) found major gas jet @ 11,146' MD (corr.)
3.725" @ 10,300' MD (XN Nipple)
10 ppm (est. based on offset)
The objective of this program is to run a scab liner for gas shut off. The well has a long history of failed
squeezes, so the scab liner is a better long-term solution.
The cement job was designed to leave the top of cement 138' below the production casing shoe to for a
future big bore coil sidetrack. A liner top packer can be run if cement is lost to formation causing the top /
of cement to come in low to design.
The leaking squeeze perfs were originally squeezed in 1989 and again in 1990. PPROF run in 1991
showed the squeeze holding. In 1992, gas production began to increase, which was the first indication that
the squeeze was leaking. The leaky squeeze was confirmed by a 1994 PPROF. The squeeze further broke
down after N2lift and large drawdown were applied to put well back on production post-packer squeeze in
late 2004.
cc w/a:
Well File
D. Cismoski
B. McLellan
cc w/o:
10/2/2006
.
.
J -13 Scab Liner Program
Prepared By: Chris Zamora
Phone#: 564-4138(w), 336-1974(h), 952-6699(c)
JOB PLANNING DETAILS:
Perforations: Leaking squeeze perf @ 11,146' MD.
Squeezed perfs: 11,146' -11,168'; 11,178' -11,198'; 11,208' -11,238';
11,248' - 11,278'
Open perfs: 11,293' - 11,310'
Perf Deviation: 430
Gas Lift Design: No Gas Lift Mandrels
TD Tag History: 04/30/06: D&T tagged @ 11,653' MD (corrected from 11,625' SLM)
11/27/05: SBHP survey tagged TD @ 11,645' SLM
08/02/04: D&T tagged @ 11,642' SLM
Injectivity: To be obtained post-sandback
Volume to top perf: 423 bbls (tubing = 393, liner to top perf = 30)
Scab Liner Specs: -942 feet of 3-1/2" STL 13Cr-80 (Calculated 11,280' - 10,338')
(32 jts, Landing Collar, Float Collar, Tapered Float Shoe, and pup joints)
Space out liner so float shoe is 5 feet above sandback top.
Caution: Well schematic revised to adjust annotated ELMD TT measurement
to 10,338'. Reference log is Camco Gas Entry Survey / Jewelry Log from
10/06/91
Cement Calcs: 5' of 7" shoe track (5*.0371) = 0.2 bbls
3-1/2" x 7" annulus from 10,950' - 11,285' (335*.0252) = 8.4 bbls
TOTAL = 8.5 bbls
(cement top with 8.5 bbls pumped ~ 10,948')
Coil String Weight: Dry tagged 11,600' and found 21k lb. weight check at the conclusion of
packer squeeze milling operations with 1.75" coil. With well and coil fluid
packed. (10/07/05)
Pulled up at 10,201' and found 36k lb. weight check with tubing and
2-3/8"coil fluid packed during packer squeeze preparation work. (9/27/05)
Coil Volume:
At 10,305'-
1.75" Coil: 23.5 bbls
2.375" Coil: 45.2 bbls
(0.00228 bbl/ft)
(0.004387 bbl/ft)
101212006
2
.
.
Hydrostatics:
Diesel 3080 psi
2%KCl 3872 psi
Fracturing Pressure: 5280 psi (assume 0.6 psi/ft)
Static: 11127/05: SBHP - 3181 psi @ 8800' TVDSS, SBHT = 1990 F, SI = 5.5 days
Comments: Jewelry depths on well schematic do not agree with ELMD from 10/06/91
Jewelry Log. For example, end of tubing is listed as 10,333' on schematic
and the log shows it located at
The leaking squeeze perfs were originally squeezed in 1989 and again in
1990. PPROF run in 1991 showed the squeeze holding. In 1992, gas
production began to increase, which was the first indication that the squeeze
was leaking. The leaky squeeze was confirmed by a 1994 PPROF. The
squeeze further broke down after N2 lift and large drawdown were applied to
put well back on production post-packer squeeze in late 2004.
The risk assessment from previous jointed pipe operations with the wellwork platform is attached
FYI. Also please refer to the attached references:
CTD Liner Running and Cementing Recommended Practice
ADW RP for handling and running 13 chrome plus latest pipe dope recommendation.
NOTE that operations with the well work platform have been plagued bv delays and high RU costs
associated with liquid packing the IA after the RU, leaking tree valves, BOPE test failures, etc.
Please attempt to progress the well preparation as far as possible prior to commencing CT
operations.
Lab testing should be performed on the cement slurry as per Attachment A. Note that a "squeeze
slurry" is recommended in order to build additional filter cake in the perf tunnels and voids.
10/2/2006
3
.
.
1. RU SL. Drift the tubing and troubleshoot any obstructions encountered. Run XN locator and tag
a corrected PBTD. (This will confirm that the no-go is adequate for hanging off the scab liner).
Refer to the 6-0ct-1991 Gas Entry Survey and Jewelry Log. The XN ELMD is 10,305'
2. Perform TIFL to insure packer squeeze is still holding. Insure the IA is bled down in order to
prevent gas communication to the tubing during the job. The objective is to minimize gas in the
tubing that may lead to out-of-balance well conditions, and this is very important.
3. RU CT. MU big hole nozzle and stingers as necessary (minimum ID in the well is 3.725").
4. Bullhead kill with 250 bbls 2% KCL followed by 350 bbls of diesel (1.5 tubing volumes) at
maximum rate. Do not exceed frac pressure of 1400 psi WHP. Cap with diesel to put the well
on balance. This should be done with care to strike delicate balance: the well should not be on a
screaming vacuum and gas needs to be kept out of the wellbore.
5. RIH and tag PBTD for depth controL
6. Sand back with 20/40 carbolite to 11,285' MD +/- 5' while taking returns. The theoretical
volume (bulk density = 13.3 ppg) is 7637 Ibs. Carbolite is recommended due to improved
settling at higher hole angles. Multiple attempts may be required depending on the void behind
pipe.
ultiple batches are recommended for accurate sand placement. Take returns while laying in the
and to minimize losses to the formation. Pump at a rate sufficient to prevent free-fall. Allow
ufficient settling time between stages. Close the choke and isolate the reel to tag.
lease note the actual volume of sand/carbolite used in the WSR summary.
7. When sandback is placed, pull up to -11,250 and pump into the well with 2% KCL at maximum
rate or a maximum WHP of 2000 psi. This will confirm that the sand top won't move during
subsequent pumping operations.
8. Dry tag the sand top to verify that it hasn't moved.
9. POOH, taking care not to underbalance the well. RDMO.
10. RU SL and determine the corrected top of the sand plug. Dump bail 4 gallons ofLARC (a ~2.5
ft. cement cap) to minimize cement infiltration into the sandback during scab liner cementing work.
101212006
4
.
.
11. Bleed the IA and liquid pack. Safe out the flowline and gas lift supply line. Service the tree.
12. Remove well house. MIRU the well work platform (WWP). Rig up BOPE. Space out the top of
the stack to the WWP floor level. Function test and PT the BOPE prior to commencing CT
operations if possible.
/'
13. Handling equipment should include:
· Lifting nubbins for 3-1/2" ST-L
· Bowl and slips for 3-1/2" ST-L
· Dog collars
· Stabbing guides
· Power tongs (provided by GBR)
· A TIW stab-in valve crossed over to a 3-1/2" ST-L pin looking down. This valve must be in
the open position and within easy access on the WWP floor at all times.
· Slings, shackles, etc. (Slings to be inspected and certified).
14. Prepare the scab liner to be set from 1 0,305' (deployment sleeve no-go depth) to 11,280'
(assuming a sand top of 11,285'). The total length should be adjusted as necessary to place the
shoe 5' above the sand top.
Note: Depths referenced above are ELMD from jewelry surveys and perforating records. The
well schematic depth reference to the jewelry locations are different.
00
3.500"
ID
2.972"
LENGTH
1.71 '
3-112" ST-L Baker "bull nose" drillable float shoe. The float shoe will
be drilled out with a 2.8" mill.
3-112" ST-L Baker Drillable Float Collar wi Dual Checks
3-112" ST-L Baker Drillable Landing Collar
3-112" 8.81# ST-L l3Cr tubing and pup joints
3-112" 9.3# Otis X Nipple
3-112" Pup Joint - 8.81# ST-L l3Cr
3-112" Pup Joint - 8.81# ST-L 13Cr
3-112" Baker liner chrome deployment sleeve with:
4" as profile, 3.78" OD fluted no-go and 3.5" STL pin.
Note: The deployment sleeve will arrive on location with the liner running tool(CTLRT), hydraulic
disconnect (1-5/16" ball), and the lower half of the swivel latched in. The CTLRTwill have a 5/8"
shearable ball seat with catcher sub and a wiper plug for 3.5" liner.
3.500"
3.500"
3.500"
3.500"
3.500"
3.500"
3.700"
2.972"
2.972"
2.992"
2.813"
2.992"
2.992"
3.000"
1.05'
1.05'
-954'
1.06'
9.90'
3.90'
5.78'
· Pre-load the 3-1/2" pipe in the pipe rack prior to commencing CT operations. Tally and
number the joints. MU liner lifting nubbins with 24" pipe wrench and back-up.
· Note all 00, ID and lengths on the tubing tally.
· Ensure the BHA has no square shoulders "looking down" or "looking up" in the event that
has to be pulled back OOH.
· Rabbit all of the BHA components with a 2.8" drift.
10/2/2006
5
.
.
15. MIRU 2.375" CT. Conduct safety meeting and review risk assessment.
16. MU dart catcher. Pig the CT with a cement wiper dart in order to verify that it won't hang up
and to get a precise measurement of the coil volume. Compare all flowmeters. Recover and
check the condition of the dart.
17. MU BHA consisting of a ctc, check and 3" nozzle. RIH tag cement top and pull up to -10,350'
MD.
18. Bullhead kill with 200 bbls 2% KCL followed by 400 bbls of diesel (1.5 tubing volumes) at
maximum rate.
Pump 20 bbl2% KCI down coil at 1 BPM. This should lower BHP (to pressure similar to
cementing pressures) and provide for expansion of any gas that is trapped behind the tailpipe and
under the packer. This is important because expansion of trapped gas during cementing
operations (see step 34) will interfere with our ability to monitor returns.
RIH to 10,280' and lay in 20 bbls of 150,000 LSRV flo-pro (-8.7 ppg) 1: 1 while taking returns.
Displace flo-pro with KCI. Watch for perf lock up. Lock up is desired because it will help to
ensure the cement top is brought above the leaking squeeze perf. Do not exceed 1200 psi WHP
(frac pressure).
POH to kill well. Pump diesel (30 bbl) down backside to make up for coil displacement. Pump
additional diesel as necessary if the well is on a screaming vacuum.
19. MU CTC, x-over and the upper half of the Baker swivel. Pull test and pressure test same.
20. RU GBR casing crew. Prior to commencing jointed pipe operations conduct a drill for closing in
the well and stabbing the TIW valve. Ensure personnel assignments are well understood.
Conduct a thorough review of crane operations. (Refer to the attached risk assessment for patch
deployment).
Note: If the well starts to flow while running the tubing, then close the slips and annular
preventer. Stab the TIW valve and re-kill the well.
21. Check the well and verify it's still dead.
22. MU the scab liner as described in step #14 and reference Attachment A for schematic. Use
stabbing guides. Use Bakerlock on the float equipment, bottom 6 joints of tubing, and the
deployment sleeve (please verify that it's compatible with chrome connections). Fill the liner
with diesel while running it.
Use a dog collar on every joint of liner and any assembly that does not have a slip recess.
Special handling is required for chrome. Refer to ADW RP for Handling and Running 13 Chrome.
Note the recommended thread compound for 13Cr is "Jet Lube Seal Guard" from Unique. The RP
is outdated for the thread compound specification.
101212006
6
.
Field make-up torques for ST-L connections are typically higher than the "book value" given by the
manufacturer. Field torque values may vary with block alignment, ambient temperature and tong
calibrations. A simple procedure to achieve good ST-L connection make up is as follows:
3-1/2" ST-L:
a. Make up ST-L connection with 48" hand wrenches to shoulder "contact". (Contact
means just enough make up that a .001 or .002 feeler gauge cannot be inserted, but no
tighter).
b. Scribe a vertical line across the connection with a medium tip magic marker (1/8").
c. Use hydraulic tongs and go to book value of make up torque. Observe the amount of
make up indicated by movement of the marker line. You will probably not see any
movement with only the book value of torque applied.
d. Increase torque until 1 0 to 20 degrees of rotation is observed at the marker line. This
will be the proper make up torque for your tongs. 30 degree of rotation from "contact"
will over torque the joint. Less than 10 degrees movement will be under torqued.
e. Inspect box to confirm no swelling. If swelling is observed lay the joints down and try
again with slightly less rotation.
f Repeat two to three times to confirm repeatable torque numbers.
g. Use field determined torque value for the remainder of liner job.
The recommended book values (ft-lbs) are:
· 2-3/8",4.7# ST-L
· 2-7/8", 6.5# ST-L
· 3-1I2",9.3#ST-L
500 min
800 min
1400 min
700 max
1000 max
1800 max
23. RIH with scab liner, and running tool assembly on 2.375" coil workstring.
24. Displace diesel (or MeOH) from the coil in order to avoid mixing with Flo-Pro. Pump two coil
volumes of KCI at maximum rate in order to warm the coil prior to engaging. MU the swivel
and pull test the CTLRT as per Baker recommendations.
25. RIH at 100 fpm, circulating filtered KCI at minimum rate. Slow across all jewelry. Hold
positive WHP and take returns if possible.
26. Lightly tag the XN at 10,305' ELMD. Verify up and down weights prior to releasing from the
liner.
27. Pull to the ball drop position. Drop the ball and displace with KCI as directed. Tag the XN and
pull up until full string weight is observed (i.e. no stack out). Slow the pump rate prior to seating
the ball. Pressure to 2000 psi to release the liner running tool. PU the CT and note string weight
to verify the running tool has released. DO NOT PULL UP MORE THAN 4'. If pull up more
than 4' running tool/wiper plug assembly will pull out of polished bore. Stack lOK# down and
pressure up to 2888 psi to shear out ball seat.
28. Pump 120 bbls of filtered KCI at max rate and monitor the returns.
3 times the 7" liner volume over the perforated interval. This volume will ensure excess Flo-
Pro is swept from the areas we will be cementing and avoid cement contamination.
10/2/2006
7
·
,
29. RU cementers and mix 8.5 bbls pumpable of Class G latex cement (LARC) as per
Attachment B.
Note that a "squeeze slurry" fluid loss is recommended in order to build additional filter
cake in the perf tunnels.
The calculated cement top is approximately 10,950. Cement top will still be 110+ ft. above
leak squeeze perfs if there is 25% loss to formation..
Place a field mix sample of cement in UCA at 170°F. Cement QC should include fluid loss,
slurry density, slurry temperature, slurry rheology, and filter cake thickness and quality.
Compare to design parameters.
30. Pump 8.5 bbls ofLARC (Attachment B), staging off the micro-motion meter and measuring out
of the displacement tank. Load the CT wiper dart (Pee Wee) after 8.5 bbls of cement are
pumped into the coil and launch the dart. Confirm that the Pee Wee dart has launched. Flush
any cement remaining out of the surface lines. Continue displacing the cement at maximum rate
with KCI.
31. Note when cement reaches the liner shoe. Closely monitor returns to track the TOC behind the
liner. With no cement lost behind pipe the TOC should be -10,850' .
A worst case maximum of25% lost to the formation will leave the cement top at -11,030'.
32. Slow the displacement as per Baker recommendations to latch the Pee Wee dart in the liner
wiper plug. After latch up, continue to pressure to shear the liner wiper plug at -2972 psi.
Note: If latch up is not seen, stop displacement at no more than the total combined displacement
(coil + liner) calculated to the liner landing collar. Resume maximum displacement rate even if
latch up is not noted.
33. After latching and shearing the dart, resume displacement at maximum rate possible. Adjust the
displacement volume to the float collar once latch up and release is noted. Slow pumps to 0.5
BPM no more than 1 bbl before the planned plug bump. If the plug does not bump. do not
overdisplace.
34. The liner wiper plug will latch in the Baker landing collar and provide a two-way check. Bump
the plug to -1000 psi. Bleed off CT pressure to confirm that floats are holding. Trap -500 psi
on the CT.
35. Monitor pressures after pumps have shutdown to confirm that the float checks are holding.
36. Pull out of the polished bore in the deployment sleeve.
37. Circulate at the liner top to clear any excess cement. (The total scab liner annulus volume is 24
bbls, so it's unlikely that any cement will be displaced above the deployment sleeve). Monitor
the return rate and verify 1: 1 returns. POOH at 80% while pumping at maximum rate. Note if
any cement returns are seen at surface. LD the CTLRT BHA.
10/2/2006
8
·
38. Freeze protect the well, taking care to leave the well liquid packed and overbalanced 500 - 1000
psi. RDMO.
10/2/2006
9
.
.
39. WOC for at least 24 hours. Prior to pressure testing confirm approximately 2000 psi
compressive strength form the UCA. Pressure test the liner/lap to 2000 psi. Report any leakoff.
If the pressure test fails a separate program will be prepared for a liner lap squeeze or liner top
packer.
40. RU 1.75" CT and MU MHA, 2-1/8" motor and 2.8" mill. Confirm the burst pressure on the
rupture disk and confirm that mag particle inspections are current on the BHA. RIH. Be alert to
cement stringers in the liner. Dress off same. Mill out the shoe track with slick water and Hi-
Vis sweeps. Back ream as necessary to dress of the shoe.
Please note the following factors can contribute to train wrecks while milling cement plugs.
o Bit design. An aggressive bit can lead to large cuttings.
o High ROP. High ROP can result in larger cuttings and/or poor hole cleaning. North
Sea CT operations have recommended a maximum ROP of 25 feet/hour.
o Poor hole cleaning. Pump frequent hi-vis sweeps combined with short trips to
agitate and suspend the cuttings. Partkularly important due to 7" tubing.
o Time of day. Problems often occur at -2:00 am.
o Static fluids and coil. Avoid shutting down the pumps and avoid stationary pipe
while on bottom.
41. Continue drilling through the cement and sand/cement interface. Monitor the returns and
employee high viscosity sweeps as necessary to lift cuttings.
42. Once through the sand/cement interface, drop ball and increase pump rate to mitigate cutting
falling back and sticking pipe. POOH.
43. RIH with nozzle for nitrogenized cleanout. Take small bites and chase up the hole. Clean out
some rat hole below the bottom perf (i.e. 11,330') if possible. Rat hole provides contingency for
dropping guns. Theoretical swell on the Omega guns leaves a 0.03" tolerance for pulling back
through the 3.5" X Nipple.
44. Reperf 11,293' - 11,310' per attached perf form.
45. N2 lift to POP. RDMO.
46. Return the well to production and test.
101212006
10
ATTACHMENT A
Well:
3,700"
3.000"
TBD
~t500"
2,972"
3.500"
2,972"
3.700"
2,812"
3.500"
2.972"
3.500"
1.810"
3.500"
2J372"
2,912"
.
.
BAKER THR.U-TUBING
5.18'
I
3.90'
..
t
9..90'
1.06'
,.
Date:
Co. Man:
.~
I:>eployment Sle$vè
3.700" X 3.00"
4" "as" Profi!o
wlfluted N·o-Go
Pup Joint
3 1/2:" $1t..
Pu.p Joint
3112" STt..
OTIS"X"
2...81'" Mln 10
3 112" SIt.. liner
SOT Landiiìg Collar
3 1/2." STl
aOT FI,oat Collar
3 112" STL
11301'
1.11'
Taperød Float Shoe
31/2" Son
fi 1"1!"'~P~g
il fI1Sí'UI" LiltctI
1.50"
3,.50"
1,50"
3.50"'-
1.5
Coil Connectør
x..ovør
Swivel
3.6
125"
HydrauUc Diis¢on!'IiØct
1 5116" EliaU Seat
1,50"
CTL.RT
2000 PSI Réil!aSé
4,00'
51S" BaU$eat
2'888 PSI Rèll'Hl1té
liner Wiper Plug
2972 PSI Retease
Tho equipment JengU¡s.. QQ's. ;#1<1 IV'$¡ M
this. pflgë are fOf linéf Ùllly PutpØ$þ,
Qime-n$.lonal drawing for Saker aHA Is Qn
,ffle.. The equipment 1$ s'ét up to u$ß' tllé
fol/Qwlngopør<tìt<m,ðl pre$1$ure$:
1. CTLRT RÐJÐ'ltSÐ Z()(J()psl
2. 8<íJ1 8Ð:tt shear Out 2888P$1
3, S:hø.,r LlnÐ-f WipeI' Plug 297~P$J
4.90' Tø Pttll Smtf fl'Qm f>ep Sleé\''$
7.20' 1'0 Pull LWP f'l'Qm f>ep SJe.(!v'$
10/2/2006
Il
.
.
ATTACHMENT B
BP CEMENT DESIGN FORM
Date: Julv 27. 2006
Cement Type
BHST
BHCT
Pump able Volume:
LARC
199°F
170°F
8.5 bbls
Well:..J:11..
Submitted By: Chris Zamora
4-5 hours
0.80 inches
0.75-1.00 inches
65 cc
50-80 cc
incl. 2 hr surface Ius 2-3 hrs
Firm cake
Firm cake
API, cd30 min. at BHCT
API, cd30 min at BHCT
The slurrv should have no free water.
MINUTES
TEMPERA TURE/PRESSURE
0-120
90°F @ Atmospheric Pressure
120-150
Increase pressure to 4000 psi. Increase
temperature to 170°F.
150-180
Gradually increase pressure to 5000 psi.
180-210
Hold Temp & Press @ 170°F & 5000 psi.
21O-End of Test
Decrease pressure to 4000 psi and hold 4000 through-
out the remainder of the test. Increase temp by 15°/hr to
a BHST of 199°F (if reached) until End of Test.
Results: Please submit results to Company Man.
Date of Test:
Service Co. Engineer:
Lab Filter cake (thickness, in):
Description: Soft, Med., Firm?:
Lab API Fluid Loss:
Thickening Time (hrs):
Slurry Density(1b/gal):
101212006
12
.
ATTACHMENT C
GAS ENTRY LOG
.
101212006
---,..,.".
w~u
-""""'<..,.,..----
,,,,,,,,,,,,,,.,.,..,,.,,,,,,,.,-.-
_..............
13
.
.
ATTACHMENT D
fiLE 'COPY
ScblulBlIergl'
RESERVOIR SATURATION
SIGMA MODE
SEPTEMBER 2001
J
tl z
()
~ ~ F
r:> "...-
u; ioD tr
tu *'5 0
êJ "".,J ..J
Z n
fj ([I :..:'
"", t;¡ ';0) W
tr /in fh
u.. (ú
c ,;.....
ç <)
1t 8:
T I: :t;:,
it $
65f.1 StilL .& atW Vie,
1>.1 SURfACE
EhS"'¡
i(.E
G.L
::r=
1:~;~;;n~~rtCn1 Dðwm
Log M(~-:as¡Jtø,::j f:-föe
MS;L
fU<.P,
£"" (:.11
{/8'( t"1 .abO'i,'B Perm. Datul!''j
;r';)fF, RKß
þ/"í 80f 0; N<:>.
~'()-();2B.. Z)4P 7 >I);)
t:Lc'-rtQ-N
~:
lOì.?iNS'i-.¡:r;¡
nN
F;l\~K.;E
13,
"1C,;Q.;:·n
Typ~?.
I
. "11;:¡77()f~,
j
j
1
{,:~:>:' '.
FINAL,
~~¥nity
D~fl5tty
Fluid l€"'BI
DL ~1¡::c
Fr9r-'
Tq
F~-c,rn
In
~'9lbrn.;tt
lA)(ì
IO~:J it
Weigh!
G,,,rJn
11 1'95 ~
1irrt{
~~ OC
. Lxx;ø:HtiD
£:1%.\'
10/2/2006
14
101212006
.
.
15
.
.
~
PERFORATING PROCEDURE
Ver 1.2, Rev 10/21/01
Well:
Date:
J-13
..............................................
7/27/06
API #: 50-029-20497-00
..............................................
Prod Engr g~.~~~.?~!!.'.?~~.........
Office Ph:
Home Ph:
CelUPager:
907-564-4138
........................................................
907-336-1974
...............h.......................................
907-952-6699
.................................
Cost Est:
CC or AFE:
...............~.?~~!~~~...............
PBJPDWL13-N
..............................................
.......................................................,
WBL Entries
........~g~.................!y.P..~...........~?~~.!?~~~~p.~~?~........................................................................................................
L.....~!.~.......L...........~.............lº.~I.~!!b..I2~!!.'.~y..~.~~..........................................................................................h)
1.:::::::~::~:::::::L::::::::::~:::::::::::::l::::~::~::::::':~::~::::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::!
I
Attachment: Heference log with proposed perfs annotated, 5'/100' scale
Reference Log Tie in Log
Log: BHCS/GR RST
Date: '9i2'åï1"9SÖ'" ·"9i6i2·6ö(h
Company: :!¥.~º::::::::::::: :::::::~ür:::::
Depths (from-to) Depths (from-to) Feet
.....~.:L.?~~.'..... - ...J.!.,.~W.. ...~.1.:g~.~:... ...J~.,.~~.º:... 17
Well Obiectives and Perforatina Notes:
Heperf 17'
Add 0
to the tie-in lo~iiëiï)ë·öï'¡·"''''''''''h.'''
depth with the reference log.
feet
SPF
6
Orient.
Random
..........................
Phasing
60°
.·.......·........u....u..........
Zone AdlRe/lperf
...?ç.............B~.P.~r!...........
....~..................' ..................... ..................... ......................
..........................
.................................... ............................................,
.......................' ..................... ..................... ......................
..........................
.................................... .............................................
.......................' ..................... ..................... ......................
..........................
.................................... ............................................,
........................ ..................... ..................... ......................
..........................
.................................... .............................................
........................ ..................... ..................... ......................
..........................
.................................... .............................................
........................ ..................... ..................... ......................
..........................
.................................... .............................................
Requested Gun Size:
2-m" HSO
......................
Charge:
.?~º~.E.'!..Q.0:.~fI~, HMX
Is Drawdown Necessary/Desired/Unnecessary During Perforating
Preferred Amount of Drawdown/Suggestions to Achieve Drawdown
.\J.I).I).~.~.~~.~.':I.~........................................................................................................
..........................................................................u...................................................
Last Tag:
..........))!~!?~. ft MD on
4/30/2006 Est Res. Pres. @
......................
........1.1...).22....... MD is
3181
psi
.....................~..............
Perforation Summary
API#:
50-029-20497-00
Prod Engr:
Summary Dist
Town:
..................... Anch Prod Engr
P.D. Center
Well:
Date:
J-13
><...~~''^'~~''''''"." ><~-
.........................................
PBTD
General Comments:
Balance
O/B/U
O/B/U
O/B/U
O/B/U
O/B/U
O/B/U
O/B/U
Depths
Based on Ref Log
Gun Dia. Orient. SPF
Phasing
Zone
Adperf/Reperf
nH~ """".... ~.. "-nn'" eo""".....o,
831303 Detail Code: 335-070-770
......······......·..···O¡:¡LG"ïCOMP'LETlON 1 PERF ......................
..................................................... ............................
10/2/2006
16
.
.
. ~
.
Hazid will be finalized by Wells Group on Slope
Risk Assessment
Liner Deployment
/
Event Consequence Risk Remediation
Slips, trips and falls Personal injury High Watch out for surface lines. Use
hand rails, watch footing on steps.
If done in winter months, sand the
location prior to rig up, use nut
plug or sand after rig up to ensure
steps and walkways are properly
covered. If the WWP has been
set on herculìte, lay plywood on
walkways if possible to reduce the
exposed slick surface.
Weather conditions Personal injury Low Use face masks, buddy system,
and breaks to warm up. Work
platform will be kept warm by
heating system. Air heaters
strateqicallv placed if required.
BOP Testing Spills, Low WWP personnel to assist and be
miscommunication familiar with BOP testing. Good
radio communication is a must.
Personnel injury - using Ensure that test joints are proper
test subs for PT. size and have a large OD bottom
sub to keep the test joint from
shooting out the stack under
pressure.
Well Control (flow) Loss of control Low Well is loaded with a fiscous pill
over the perfs and kìll weight fluid.
Fluid level will be visually
monitored, tbg filled at regular
intervals. BOP stack is dressed for
3-1/2" and 2-3/8" pipe plus two
sets of blind shears. In addition
there will be an annular (bag)
preventor. The BOP control panel
will be operable from the floor with
a remote panel in the coil operator
cab. Ensure that well control falls
within Drilling and Wells Policy, or
proper dispensations have been
prepared.
Exposure of personnel Personal injury High Making connections will be done
on platform to injury by personnel familiar with
while picking up pipe. operation using power tongs and
back up tongs. Wire/cable slings
need to be certified before
being used for tongs. If top of
BOPs above platform floor,
personnel will be using tongs
while working on scaffolding
which increases the risk of
injury. Liner wìll be picked up in
singles from the tubing fingers.
The workinq floor will be cleared
10/2/2006
17
.
. ,
of non-essential oersonnel,
Open wellbore while Spill, loss of control Medium Same as above
layinq down liner
Liner slipping downhole Possible injury, fishing Medium Use collar safety clamp
after being landed in job/loss of well
slips
Elevators improperly Possibly drop liner as Low Verify elevators are correctly sized
sized for liner above for pipe. Nubbins have been
checked and verified. Use slip
tvpe elevators.
Open work floor over Injury to personnel by Low Floor has opening that allows
wellhead falling through opening lubricator to penetrate above floor.
Insure that slip bowl will set in top
of lubricator or BOP. Risk
increases if BOP's above floor.
Length of liner joints are Can't fully pick up with Medium Trolley back and place injector on
greater than normal perf crane below coil T-Bar. deck before pulling liner.
Quns.
Spill from liner while Fluid from inside or High Tray underneath tubing rack area.
pulling/standing back outside of pipe drips onto Spill dikes around wellhead and
pipe ground while cellar.
líftinq/movinq liner
Setting slips around liner Personnel injury, Medium Experienced personnel on tongs.
possibly drop liner Use safety collar and properly
sized handlina tools.
Injector over work area Personnel injury, Low Minimize number of personnel in
equipment damage area. Discuss job procedure in
detail before initiating work to
minimize exposure time.
Crane Lifts (Picking up Personnel injury, Medium Clear area of non-essential
liner) equipment damage personnel. Use tag lines if
possible. Do not get below
suspended loads. Use spotter to
assist crane operator.
"
101212006
18
.
.
J-13 Proposed Scab Liner
13-3/8" CSG, 72#, L-80, JD= 12.347" I
2tJ77'-/7" sssv I.ANIJING N1P I
2603' H 9-5/8" DV A<R I
.
Minimum ID = 3.725" @ 10300'
4-1/2" oris XN NIPPLE
7" TBG, 26#, L-80, .0383 bpf, ID ';6.276"
I TOP OF 4-1/2" LNR I
10269'
4-1/2" OTIS X NIP, ID = 3.813"
14-1/2" TBG, 12.6#, L-80, ..01S2 bpf, 10 = 3.958" I
10333'
10300' -14-1/2" OTIS XN NIP, Ð = 3.725" I
10333' -14-1/2" TUBING TAIL I
10340' H EJ..MDTTLOGGID101(j6/91
9-5/8" eSG, 47#, N-80, ID = 8.681" I
10780'
3-1/8"
3-1/8"
3-1/8"
3-1/8"
3-3/8"
PERFORA TION SUMMARY
REF LOG: SHeS ON 09/28/80
ANGLEATTOPPERF: 34@ 11146'
Note: Refer to Production DB for historical perf data
SPF INTERVAL Opn/S z DATE
4 11146 - 11168 S 03/26/81
4 11178 - 11198 S 03/26/81
4 11208 - 11238 S 05/02/81
4 11248-11278 S 05/02/81
4 11293-11310 0 01116/89
3112" STllNR, 93#. í 3Cr-SO
7" lNR, 29#, L-80, .0371 bpf, ID= 6.184"
DA TE REV BY
COMMENTS
PRUDHOE BA Y UNIT
WELL: J-13
PERMIT No: 'í 800830
API No: 50-029-20497-00
SEC9, T11N, R13E
EIP EXpl!)tatlon (Alaska)
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
MPC-41
MPG-05
MPL-33
P-06A
OS 02-25
u.~. 09-10
B-20
Y-25
PSI-10
P-26
02-14A
F-12
04-35
t 5-09A
15·09A
5·09A
" J-13
D.S. 09-29
BP Exploration (Alaska) Inc,
Petrotechnical Data Center LR2-1
900 E, Benson Blvd,
Anchorage, Alaska 99508
Date Delivered:
Job#
10889195
10715440
11058514
11132061
10987525
11058237
10980591
10928605
10715447
10928634
11075901
NA
10889172
10889183
NA
10919942
10877750
10980596
~NED OCT 3 12005
Log Description
SBH SURVEY
MPSP INJECTION PROFILE
INJECTION PROFILE
LDL
INJECTION PROFILE
INJECTION PROFILE t>o--~\,\~~ ~
LDL
MEM PPROF W/DEFT
MPSP IPROF & WARMABACK
MEM PPROF W/DEFT
MEM PPROF & IPROF
LDL
SBHP SURVEY
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
LDL
PPROF WIDEFT
c
O&-~ÌJ-
Date
12/24/04
11/09/04
06/03/05
10/12/05
06/24/05
08/16/05
08/05/05
11/20/04
01/01/05
06/02/05
07/09/05
06/03/05
10/10/04
11/04/04
02/02/05
02/13/05
06/29/04
08/10/05
NO. 3503
10/18/05
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
CD
-----
-~
Alaska Data & Consulting Services
2525 Gambell Street. Suite 40
Anchorage, AK 99503- 8
ATTN: Beth
Received by:
r - I'
ð~i\rd,
~.~:~--.:A.'i.:tifi;-_§'>_.~.' "-~O
r'fJU'-~ 7':~~~-~~~!r
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION EIVED
1.0perationsPerlormed: REPORT OF SUNDRY WELL OPERATIONSOCT 2 $ 2004
AbandonD RepairWellŒ) PluÇJ PerforationsD Stimulate D III. ¡ Otherij
. .KlaS¡Œ ~U . Ja......~.",..... .. Commissior
Alter Casing 0 Pull TubingO Perforate New Pool 0 WalverD Time Extension "
m:;hor~ge
Change Approved ProgramD Operation Shutdown 0 Perforate 0 Re-enter Suspended Well 0
2. Operator BP Exploration (Alaska), Inc.
Name:
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
4. Current Well Class:
Development [&]
69.10
8. Property Designation:
ADL-0028281
11. Present Well Condition Summary:
Stratigraphic 0
9. Well Name and Number:
J-13
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
Exploratory 0
Service 0
5. Permit to Drill Number:
180-0830
6. API Number
50-029-20497-00-00
Total Depth
measured 11800 feet
true vertical 9465.2 feet
Effective Depth
measured 11749 feet
true vertical 9420.4 feet
Plugs (measured)
Junk (measured)
None
11646,11624
Casing
Conductor
Liner
Production
Surface
Length
80
1530
10754
2643
Size
20" 91.5# H-40
7" 29# L-80
9-5/8" 47# N-80
13-3/8" 72# L-80
MD TVD
28 108 28.0 108.0
10265 - 11795 8220.2 - 9460.8
26 - 10780 26.0 - 8607.7
27 - 2670 27.0 - 2653.1
Burst
1490
8160
6870
4930
Collapse
470
7020
4760
2670
Perforation deDth:
Measured depth: 11293 -11310
True vertical depth: 9025.95 - 9040.38
Tubing ( size, grade, and measured depth): 7" 26# IJ-45
4-1/2" 12.6# L-80
@ 24
@ 10226
10226SCANNED NOV () 3 2004
10333
Packers & SSSV (type & measured depth):
7" Guiberson Polar Packer
9-5/8" DV Packer
@ 10226
@ 2603
12. Stimulation or cement squeeze summary:
Intervals treated (measured): 10140 -10282
Treatment descriptions including volumes used and final pressure: 8.5 Bbls 15.8 ppg Class G Cement @ 180 psig
Representative Dailv Averaqe Production or Injection Data
Gas-Mef Water-Bbl Casing Pressure
11 1392 150
17.1 2568 600
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
717
1224
Tubing Pressure
1142
205
14. Attachments:
Copies of Logs and Surveys run -
Daily Report of Well Operations - !
15. Well Class after proposed work:
Exploratory D
16. Well Status after proposed work:
Oil[!] GasD
DevelopmentŒ]
Service D
Signature
Garry Catron
Garry Catron
}:fa! c~
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
NIA
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact
Printed Name
Title
Production Technical Assistant
Phone 564-4657
Date
10/18/04
(")
1 ~
<..J
\G\~JAL
,BfL
OCT 2 7 20D4
Form 10-404 Revised 4/2004
\.
J-13
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
09/12/04 ATTEMPTED TO LOAD TUBING WITH 2°/0 KCL AND CRUDE FOR SETTING PLUG AND
CEMENT SQZ. TUBING PRESSURED UP TO 3000 PSI SOON AFTER PUMPING AT 2.0
BPM AND IA PRESSURE FOLLOWED. ONLY PUT AWAY 60 BBLS OF KCL AND THEN
FREEZE PROTECTED. PUMP RATES DOWN TUBING AT 2500 PSI AT 0.5BPM WITH IA
PRESSURE AT 2950 PSI WHILE FREEZE PROTECTING.. .
09/21/04 SET HES FASDRILL PLUG AT 102581, SHOT TUBING PUNCH FROM 101931-101981
09/30104 TIIIO = 0+10+/170, TEMP = SI. IA FL PRE-MITIA. IA FL NEAR SURFACE.
10102/04 T/I/O=010/160 JOB IN PROGRESS, CONTINUED TO 10-3-04 WRS
10103/04 JOB CONTINUED FROM 10-2-04 WRS. T/I/O=010/160 (MIT IA 3000 PSI) PASS. LOADED
IA WITH 7 BBLS CRUDE, 1 ST MIT PASSED WITH A LOSS OF 120 PSI 1 ST 15 MIN. AND A
LOSS OF 60 PSI 2ND 15 MIN. ßLED IA BACK TO 0, WELL W AS TAGGED AND DSO
NOTIFIED. FWP=010/160
10104/04 CTU#5, MILL CMT; MIRU. RIH WIWFD 2-7/8" MOTOR AND 6" REEVES
UNDERREAMER. MILL HARD CEMENT FROM 101161 TO 102151 CTMD (XO TO 41/21l
POOH CIRCULATING BOTTOMS UP. CONT ON WSR 10105/04...
10105/04 CTU #5, MILL CMT; CONT FROM WSR 10104/04... POOH CIRCULATING BOTTOMS
UP. PERFORM MITIA TO 3000 PSIG - FAILED DUE TO THERMAL COOLING. RBIH WITH
27/8" PDM WI 3.60" 5-BLADE JUNK MILL. PERFORM MIT-T TO 2500 PSIG - PASSED.
MILL CEMENT FROM 102101 TO 102391 CTMD. MILL HES FASDRILL PLUG AND PUSH
TO 10258 CTMD. APPEAR TO BE SPINNING ON TOP OF PLUG. PUMP FLO-PRO PILL
AND CHASE OUT OF HOLE. BREAK DOWN TOOLS AND SET LUBRICATOR DOWN ON
BACK DECK.
10106/04 CTU#5: MILL CEMENT/N2 LIFT. «<CONTINUED FROM 10/5/04»> STAND BY FOR
NORTHSTAR SAFETY STAND DOWN.
10/07/04 CTU#5 MILL: END WEATHER STANDBY. RIH WI 3.625" JUNK MILL, MTR, UID JARS.
LIGHT TAG @ 10217'. VERY LITTLE MOTOR WORK, ONE STALL, THEN CLEANLY PASS
THROUGH TT. RIH DRY TO 116001. PUMP 20 BBL FLOPRO SWEEP, CHASE OUT @
80%. MUIRIH WI 3" JSN, PUMPING N2 @ 600 SCFIM, TAKING RETURNS TO LP.
BEGIN LIFTING FROM 30001. CONTINUED ON 10108/04 WSR.
10/07/04 CTU#5 MILL: END WEATHER STANDBY. RIH WI 3.625" JUNK MILL, MTR, UID JARS.
LIGHT TAG @ 102171. VERY LITTLE MOTOR WORK, ONE STALL, THEN CLEANLY PASS
THROUGH TT. RIH DRY TO 116001. PUMP 20 BBL FLOPR
10108/04 CONTINUED FROM 10107/04 WSR. N2 LIFT @ 600 SCFIM FROM 30001, 4400',5700',
6400',7100',78001. REFILL N2. N2 LIFT @ 1100 SCFIM FROM 76001,8200.,87001. WELL
APPEARS TO BE KICKING OFF. POOH. COMPLETE BOP TEST. RDMO. WELL LEFT
FLOWING.
BBLS
10
60
1300
3
368
90
60
8.5
FLUIDS PUMPED
Methanal
20/0 KCL
Crude
Diesel
60/40 Methanal
Fresh Water
Inhibited water 1 % KCL
Class G 15.8 ppg Cement
Page 1
2179 XS 1% KCL
208 FloPro
765 Xtra Slick
5051.5 TOTAL
J-13
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
Page 2
¡"TREE'=" 6" CAMERON
WELLHEAD = FMC
ÁCTüÁfÔR; . .. 6,iÓfiá
«««"u,u~..n<"« u"",. '."'U"""'''' . . """"" u ,..n«"""",."
KB. ELEV = 69.07'
BF~Eï.Ði .;,;.m "41:'87;
ì{op,;",...,..m.w"""w,..m,.. '2300;
Max Angle = 61 @ 8600'
5atum"¡v15,,;,w..~"m""1>1T515;'
Datüi1ïwÖ;;;aäö(j' ss
J-13
SAFETY NOTES:
8
. 2077' l-i 7" SSSV LANDING NIP I
r 13-3/8" CSG, 72#, L-80, D= 12.347" H 2670' J
Minimum ID = 3.725" @ 10300'
4-1/2" OTIS XN NIPPLE
I 7" TBG, 26#, L-80, .0383 bpf, ID = 6.276" l-i
I TOP OF 4-1/2" LNR l-i
I TOP OF 7" LNR l-i
10226' I
10226' I
10265' I
! 14-1/2" TBG, 12.6#, L-80, ..0152 bpf, ID = 3.958" l-i 10333' I
1-1
2603' l-i 9-5/8" DV PKR I
r 1
1 10080' l-i TOC (PKR SQZ 09/28/04) I
110193'-10198' I-iTBG PUNCH (09/21/04) I
1 10203' l-i TOP OF PBR I
I 10226' l-i 9-5/8" x 7" GUIB. POLAR PKR I
I 10226' l-i 7" x 4-1/2" XO I
\
I
..
I
j t
1 10269'
I
I
1
1-i4-1/2" OTIS X NIP, ID = 3.813" I
1-i4-1/2" OTIS XN NIP, ID = 3.725" I
1-i4-1/2" TUBING TAIL I
l-i ELMD TT LOGGED 10/06/91 I
10300'
10333'
10340'
9-5/8" CSG, 47#, N-80, ID = 8.681" l-i 10780' ~
ÆRFORA TION SUMMARY
REF LOG: BHCS ON 09/28/80
ANGLE AT TOP PERF: 33 @ 11146'
Note: Refer to Production DB for historical perf data
SIZ E SPF INTERV A L Opn/Sqz DA TE
3-1/8" 4 11146 - 11168 S 03/26/81
3-1/8" 4 11178-11198 S 03/26/81
3~1/8" 4 11208-11238 S 05/02/81
3-1/8" 4 11248-11278 S 05/02/81
3-3/8" 4 11293 - 11310 0 01/16/89
I PSTD l-i 11749'
I 7"LNR,29#,L-80,.0371bpf,ID=6.184" l-i 11795'
DATE
09/80
07/18/01
11/01/01
08/04/04
10/16/04
REV BY
DA TE REV BY
COMMENTS
PRUDHOE BAY UNIT
WELL: J-13
ÆRMIT No: 1800830
API No: 50-029-20497-00
SEC9, T11N, R13E
COMMENTS
ORIGINAL COM PLETION
RNlTP CORRECTIONS
WBITP SURF LOC CORRECTION
MDC/TLP IBP, FISH NECK
DBMTLH FASDRILL PLUGITBG PUNCH
.,.
I 11047' l-i MARKER JOINT I
~ 11600' CTM H HES FASDRILL MILLBJ/PUSHED TO 8TM (10/07/04) 1
-, 1 11646' H 27' PERF GUN - 03/26/811
~
BP Exploration (Alaska)
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 21 November 1994
RE:
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PLS FINAL BL + RF
1 PLS FINAL BL + RF
1 PFC/PERF FINAL BL+RF
1 PLS FINAL BL + RF
1 PLS FINAL BL + RF
1DIFL/GR FINAL BL+RF
1 BHC/GR FINAL BL+RF
1 CN/GR FINAL BL+RF
1 SSTVD FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
1187.03
1341.01
6010.06
6063.01
6299.03
6301.00
Please sign and return to: At~s Wireline Ser~
5600~.Street / ~
Suite 2~kl / ~
Received by: , ~o
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 14 July 1994
RE: Transmittal of Data
Sent by: ANCHORAGE XPRES
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
J-13 (22-03-11-13)
N-01 (13-08-11-13)
E-!3 (01-11-13)
N-06
DESCRIPTION
cN/GR L~WG TAPE+L~ST
/~CN/~R L~W~ TAP~+L~ST
·
~c~/~R LDW~ TAP~+L~ST
/~C~/GR ~D~ TAP~+L~ST
/ CN/GR LDWG TAPE+LIST
ECC No.
Run ~ 1 1187.02
Run # 1 5650.07
Run ~ 1 4060.03
Run # 1 5955.01
Run # 1 6224.00
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Please s i~n and return to:
Petrotechnical Data Center
BP Exploration (Alaska) Inc
900 East Benson Boulevard
Anchorage, Alaska 99508
Received by
Date
Date:
~J. ease sign and return to:
Petrotechnical Data ~ tar
BP Exploration (Alaska/
900 East Benson Boulevard
Anchorage, Alaska 99~08
Received by
Dste ALAS '~ N COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 7 July 1994
RE:
Transmittal of Data
Sent by: ATLAS WIRELINE
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
ECC No.
5-5 \ z-27
,,~ PDK/GR FINAL BL
1 PDK/GR FINAL RF
Run # 1 4269.01
Run # 1
~D--%~ x-07 (43-08-10-:4)
o 1/~LS FINAL BL
! PLS FINAL RF
lzPLS/GLS FINAL BL
PLS/GLS FINAL RF
Run # 1
Run # 1
Run # 1
Run # 1
4046.04
PDK/GR FINAL BL
PDK/GR FIN~ RF
Run # 1
Run # !
4!46.01
/~ SBT/GR FINAL BL
1 SBT/GR FINAL RF
Run # 1
Run # 1
6229.00
/~ CN/GR FINAL BL
1 CN/GR FINAL RF
Run # 1
Run # 1
1187.O2
%%-~%J~. Z-14 (44-18-11-13)
1 CN/GR FINAL BL
CN/GR FINAL RF
Run # 1
Run # 1
6012.O1
~-COLLAR LOG FINAL BL
COLLAR LOG FINAL RF
Run # 1
Run # 1
1991.02
Please sign and return to: Atlas Wire!ine Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
BP EXPtORATION
BP ~XDIOratmn (Alasl<a) Inc.
900 Eas~ Benson Boulevard
PO. Box 196612
Anchorage. Alaska 99519-6612
(~37) 561-5111
DATE: 10/24/91
T~ 82948
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
09/22/91
10/05/91
08/22/91
09/25/91
10/01/91
09/25/91
~fg?-09/ CCL 09/21/91
~-/~£S-!8~ GAS LIFT SURVEY 08/30/91
~]-~Y-16/ PROD-F 10/04/91
3,.1~ A-16/ INJ 09/01/91
~-q~ E-13~-~- PROD-F 09/24/91
~'~$~S-07/ GAS LIFT SURVEY 09/22/91
TEMP 10/05/91 ~1
LEAK DET 09/29/91 %1
PITS 09/22/91 ~1
LEAK DET 10/04/91 #1
GAS LIFT SURVEY 09/26/91 ~1
LEAK DET 09/27/91
SPINNER 10/02/91
SPINNER 10/03/91
INJ 09/30/91
INJ 10/01/91
INJ 10/07/91
INJ 10/06/91
TEMP 10/07/91
INJ 10/06/91
PITS 09/27/91
INJ 09/28/91
INJ 10/01/91
CCL 10/02/91
LEAK DET 10/03/91
JEWELRY
5 "
~,-~ J-13 ~ GAS ENTRY, JEWELRY
5 "
/
~9 W-07 ~ JEWELRY
~ __.___.
5 "
9047.00-10650.00 CAMCO 5 "
13950.00-14512.00 CAMCO 5 "
12101.00-13175.00 CAMCO 5 "
9070.00- 9621.00 CAMCO 5 "
8869.00-10162.00 CAMCO 5
8780.00- 9331.00 CAMCO 5
14200.00-14987.00 CAMCO 5 "
1800.00- 4550.00 CAMCO 2/5"
9000.00- 9405.00 CAMCO 5 "
10470.00-10900.00 CAMCO 5
10900.00-11290.00 CAMCO 5 "
375.00-11191.00 CAMCO 2/5"
8800.00- 9812.00 CAMCO -5
7400.00- 7600.00 CAMCO 5 "
9100.00- 9547.00 CAMCO 5 "
9770.00-10150.00 CAMCO 5
100.00- 8550.00 CAMCO 2 "
170.00-11350.00 CAMCO 2 "
9000.00- 9230.00 CAMCO 5 "
12500.00-13125.00 CAMCO 5 "
9150.00- 9520.00 CAMCO 5 "
9050.00- 9385.00 CAMCO 5 "
9650.00-10078.00 CAMCO 5 "
9050.00- 9400.00 CAMCO 5 "
8300.00- 9116.00 CAMCO 5 "
9100.00- 9430.00 CAMCO 5 "
9450.00- 9734.00 CAMCO 5 "
12000.00-12650.00 CAMCO 5 "
10750.00-11297.00 CAMCO 5 "
9350 00- 9650
08/30/91 ~1 10800.00-ill50.0,~MCO
10/06/91 #1
10/05/91
GAS ENTRY
S "
S "
900~ -!0143.00 C.~MCO
9300.00- 9800.00 CA/~-CO
informataon Control
Well Records
Adrian J. Martin
STATE OF ALASKA
( A~' .(A OIL AND GAS CONSERVATION
REPORT OF SUNDRY WELL OPERATIONS
Stimulate Plugging
Repair well
5. Type of Well:
Development
Exploratory
S~'~graphic
1. Operations performed: Operation shutdown
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1049' SNL, 803' WEI., SEG. 09, Tl lN, R13E, UPM RE([EIVED
At top of productive interval
1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM
At effective depth NOV - 6 1990
1361' SNL, 2602' WEL, SEC. 03, T11N, RI3E, UPI Alas!~.0iJ & ~as Cons, .Q~~
At total depth
1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM ' ~lt(~ll~ "
11800feet Plugs (measured)
BKB 9464 feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured 11749feet
true vertical BKB 9420feet
Perforate
Other X
6. Datum elevation (DF or KB)
KBE. 69.07 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J- 13 (22-03-11-13)
9. Permit number/approval number
8O-83 / 90-619
10. APl number
50- O29-2O497
11. Field/Pool
Prudhoe Oil Pool
Junk (measured) fill at 11706' MD (01/89)
True vertical depth
BKB
137
267O
8607
10264-11795 8218-9460
Sqzd: 11146'-11168', 11178'-11198',
11208'-11238', 1'1248'-11278'
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 12 c.y. 137
Surface 2643 13 3/8 3720 c.f. 2670
Intermediate 10753 9 5/8 1665 c.f. 10780
Production --
Liner 1531 7 427c. f.
Perforation depth: measured 11293'-11310'
true vertical subsea
8957'-8971'
Tubing (size, grade, and measured depth) 7"L-80 to 10226'with 4 1/2"tailpipe to 10333'
Packers and SSSV (type and measured depth) 9 5/8' Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077'
See Attachment
13. Stimulation or cement squeeze summary
Intervals treated (measured)
14.
Treatment description including volumes used and final pressure
Tubing Pressure
Rec)resentative Daily Averaae Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
2348
1031
Service
Date
Prior to well operation 2220 14638 46
Subsequent to operation 4520 7746 540
15. Attachments ~ 16. Status of well classification as:
Copies of Logs and Surveys run
I
Daily RePOrt of Well Operations X Oil X Gas Suspended
17. I hereby.~,,~ '.~y. th.~t the~,~lO~ t~ue and correct to the best of my knowledge.
Signed /L,~ ~ [~ ~ Title Supervleer Gravity Drainage
-'orm 10-404 Rev 06/15f(88 ~
SUBMIT IN DUPLICATE
WELL J-13 (22-03-11-13~ PBU
COILED TUBING SQUEEZE OPERATION
We perforated the following additional intervals dudng a squeeze on August 18, 1990:
11293'- 11310' MD BKB
Jetted across perfs at 2.0 bpm. Reversed cleaned. Injection test at 0.5 bpm at 2500 psi. Reversed in N2
for 1500 psi. Underbalanced (5000' MD) when bled to flowline pressure. Shut in wellhead pressure at
2000 psi. Tested well and put on production.
mr:l 0/27/90
BP EXPLORATION
BP Exploration (Alasl(a) Inc.
900 East Benson Boulevarcl
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :09/04/90
T#:81631
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
F-29 Completion 08/24/90 #1 9800-10160 Sch 5"
J-13 Completion 08123/90 #1 11000-11400 Sch 5"
Q-06 Completion 08/24/90 #1 11000-11368 Sch 5"
S-19 Prod-F 08/28/90 #1 9500-9957 Sch 5"
U-06 Perf 08/28/90 #1 8300-9265 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVC31R
~.~'T-~¥E oF ALASK~
ARCHIVES
-S E p - 7 0 1990
,'Uaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploratton (Alaska} Inc.
900 East Benson Boulevard
PO. Box 196612
Ancl3orage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :08/15/90
T#:81493
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
A-27 INJ 07/27/90 #1 8750-9305 Camco 5"
A-30 Pump-ln/Temp/FM 07/29/90 #1 10600-11077 Camco 5"
E-10 GR/CCL 07/26/90 #1 11400-11739 Camco 5"
J-13 GAS ENTRY 07/27/90 #1 11000-11400 Camco 5"
M-23 PROD-F 08/01/90 #1 9350-9760 Camco 5"
W-06 LEAK DET 07/31/90 #1 3300-8198 Camco 5"
X-15 P ROD-F 07/31/90 #1 9350-9950 Camco 5"
Y-16 PITS 07/22/90 #1 8950-9422 Camco 5"
Y-16 PROD-F 07/22/90 #1 8900-9422 Camco 5"
Y-17 Pump-in/Temp/FM 07/24/90 #1 10100-10430 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RECEIVED
1. Type of Request:
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1049' SNL, 803' WEI., SEC. 09, T11N, R13E, UPM
At top of productive interval
1640' SNI., 2915' WEL, SEC. 03, T11N, R13E, UPM
At effective depth
1361' SNL, 2602' WEL, SEC. 03, T11N, R13E, UPI
At total depth
1338'SNL, 2601'WEL, SEC. 03, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11800 feet
true vertical BKB 9464 feet
L STATE OF ALASKA
A ,.,KA OIL AND GAS CONSERVATION COMMI
APPLICATION FOR SUNDRY APPROVAI r , . .
"' ~ ~ u ~ !~i ~ LI
Abandon ~ Suspend ~ OperaDon Shutdown __ Re-enter suspended well~
Alter caang ~ Repar well~ Plugging __ Time extensmn __ SDmulate
Change approved program ~ Pull tubing ~ Vanence ~ Perforate ~ OIh---~ X
5. Type of Well:
Development
Exploramry
Stra§graphmc
6. Datum elevation (DF or KB)
KBE = 69.07 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J-13 (22-03-11-13)
9. Permit number
80-83
10. APl number
50- 029-20497
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11749 feet
true vertical BKB 9420 feet
Plugs (measured)
Casing Length
Structural --
Conductor 110
Surface 2643
Intermediate 10753
Production --
Liner 1531
Perforation depth: measured
Junk (measured) fill at 11706'MD (01/89)
11293'-11310'
Size Cemented Measured depth True vertical depth
BKB
20 x 30 12 c.y. 137 137
13 3/8 3720 c.f. 2670 2670
9 5/8 1665 c.f. 10780 8607
true vertical subsea
8957'-8971'
10264-11795 8218-9460
Sqzd: 11146'-11168', 11178'-11198',
11208'-11238', 11248'-11278'
7 427c. f.
Tubing (size, grade, and measured depth) 7" L-80 to 10226' with 4 1/2" tailpipe to 10333'
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077'
13. Attachments Description summary of proposal X
Detailed operations program ~ BOP s,,~to~~
IVEE
15. Status of well classification as:
AUG o 919 0
Suspend, ~ ~
~asl<a Oil & Gas Cons,
14. Estimated date for commencing operation
July~August 1990
16. If proposal was verbally approved Oil X Gas ~
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ,~~~ ~~~ ~'t./$,~t~/~l~Title Supervisor Gravi~/ Drainage
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test ~ Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10- ~co~
ORIGINAL SIGNED BY
LSL'NI~- C. fiMrTl-I
/ADproval No.
SUBMIT IN TRIPLICATE
Approved by order of the Commission
Form 10-403 Rev 06/15/88
INJECTOR
PAC:< OFF
BOP STACK
CONNECTION
Q UiCI,( UNION
.... F BUND SHEARS
FBUND
i.... WHP ;SENSOR
FPIPE SUP;S
l
FLANGED CONNECTION
SWAB VALVE
TYPICAL CTU STACK
RECEIVED
AUG o 9
· 'Uas/a.0il & Gas Cons. Commission
Anchora~
FORM 1481 5/I0,/8g ,
WELL J-13
CTU CEMENT SQUEEZE PROPOSAL
A coiled tubing cement squeeze of existing pedorations is proposed as follows:
1. Perform pre-workover acid perforation wash.
2. Rig up CTU and support equipment and pressure test BOPs to 4000 psi.
3. Pump cement and squeeze existing perforations.
4. Reverse out cement after the squeeze is obtained. Wait overnight, then test squeeze by
performing an inflow test. If squeeze fails, immediately resqueeze.
5. If squeeze is successful, pedorate the following interval (ref:9-28-80 BHCS):
11293' - 11310' MDBKB
6. Return the well to production and test.
7. If the well will not return to production and/or sustain production, a perforation acid wash may
be performed.
BP EXPLORATION
BP ExDloration (AlasKa) Inc.
900 East Benson Boulevarcl
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE: 05/30/90
EXXON T# 81193
PHILLIPS
STATE OF ALASKA
ARVHIVES
SYSTEM T~,.De & Transmittal Only
BP MAGNETIC LIS TAPE & LISTING
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-~,H. 5.
C-12 CH/CNT-D
SCH#73881
C-21 CH/CNT-D
SCH#73868
C-22 CH/CNT-D
SCH#73869
J-13 CH/CNT-D
SCH#73871
J-26 :-CH/CNT-D
SCH#73874
05/14/90
1600bp~
05/15190
1600bp~
05/16/90
1600bp~
05/17/90
1600bpI
05/17/90
1600bp~
#4 11096-11979
4 passes AP1#50-029-20387
#1 8489-9217
4 passes AP1#50-029-20753
#1 9292-10110.5
4 passes APi#50-029-20758
·
TP#0706a ~'~..~J(-~/~/
#1 10779-11726.5 TP#07069
4 passes AP1#50-029-20497
#1 9812.5--10651.5 TP#07070
4 passes AP!#50-029-21734
Z-14
CH/CNT-D 05/16190
SCH#73872 1600bp~
#1
4 passes
9592-10251.5 TP#0707~j.
AP!#50-029-21844 /'//~ .-~
Z-20
CH/CNT-D 05/16190
SCH#73873 1600bp~
#1
4 passes
10586.5-11568 TP#07072
AP!#50-029-21859 ~/_/Y'~-~ /
***ARCHIVES ONLY:
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
Alaska Oil & Gas Cons. Commission
Anchorage
BP Exploral~on (AlasKa) Inc.
900 East Benson Boulevarcl
PO Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 05/23/90
T#:81206
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINA[.:~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
C-21 CNL 05/15/90 #1 8500-9189 SCH 5"
C-22 CNL 05/16/90 #1 9300-10088 SCH 5"
J-13 CNL 05/17/90 #1 10800-11699 SCH 5"
J-26 CNL 05/,17/90 #1 9820-10627 SCH 5"
Z-14 CNL 05/16/90 #1 9600-10235 SCH 5"
Z-20 CNL 05/16/90 #1 10650-11526 SCH 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
May 26, 1989
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well J-13 (22-03-11-13) PBU
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of performing a cement squeeze and reperforation
of the well.
Yours very truly,
~;grogdLct ion Engineering
JAM: JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
" STATE OF ALASKA I~
..,KA OIL AND GAS CONSERVATION COMM ,.,,,.,tN
REPORT OF SUNDRY WELL OPERATIONS
Stimulate
Alter casing
Plugging
Repair well
5. Type of Well:
Development X
Exploratory
Stratigraph~c
i. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1049' SNL, 803' WEL, SEC. 09, T11N, RI3E, UPM
At top of productive Interval
1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM
At effective depth
1372' $NI., 2650' WEL, SEC. 03, T11N, R13E, UPM
At total depth
1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11800feet
true vertical BKB 9464 feet
Perforate
Other
6.
X
Datum elevation (DF or KB)
KBE ,, 69.07 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J- 13 (22-03-11-13)
9. Permit number/approval number
80-83 / 8-946
10. APl number
50- O29-20497
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11706feet
true vertical BKB 9382feet
Junk (measured) fi#at 11706'MD (01/89)
Casing Length
Structural --
Conductor 110
Surface 2643
Intermediate 10753
Production --
Liner 1531
Perforation depth: measured
Size Cemented Measured depth
20 x 30 12 c.y. 137
13 3/8 3720 c.f. 2670
9 5/8 1665 c.f. 10780
11293.-11310'
true vertical subsea
8957'-8971'
7 427c. f.
True vertical depth
BKB
137
267O
8607
10264-11795 8218-9460
Sqzd: 11146'-11168', 11178.-11198',
11208.-11238', 11246'-11278'
Tubing (size, grade, and measured depth) 7" L-80 to 10226' with 4 1/2" tailpipe to 103,33'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077'
~I~,, '~,_ 'L~ ri_ i !~ ~" , .
Representative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 2220 14638 46 0 2348
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
1590 1106 321
16. Status of wellclassEication as:
Oil x Gas Suspended
0 167
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ /'/~. ~ Title Manager Production Engineering
Form 10/~ Rev 06/15/88 ~/(./
SUBMIT IN DUPLICATE
WELL .I-13 (22-03-11.13] PBU
CTU CEMENT SOUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed as detailed below:
12/19/88 Performed perforation mud acid treatment with ballsealers; flowed well.
12/29/88
Rigged up coiled tubing unit and pressure tested to 4000 psi. Cleaned out
wellbore.
12/30-31/88 Cement squeezed all existing perforations. Reversed out cement.
1/14/89
1/16/89
1/17/89
Pressure tested squeeze.
Rigged up Dresser Atlas and perforated the following additional interval using
3 3/8" Jumbojet guns at 4 spf:
11293' - 11310' MD BKB
All initial perforations were left squeezed.
Attempted to return well to production; would not flow.
Nitrogen lifted well; returned well to production and tested.
5/22/89
Standa,d Alaska
Productmn Company
900 Eas! Ben$on ~ule~
P O ~. 19~12
Anchorage A~sko ~519-~1~
(907) 564-5111
INDEXED
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
STAND/~RD
ALASKA PRODUCTION
Date: 01-20-89
TI: 79754
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
RESERVOIR
REFERENCE:
ARCHIVES
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
j-i3
CL 01-16-89 #1 11000-11470 Atlas 5"
~_ ~ Alaska Oil & ~s C~,~?, Commission
Received
Date
A un,, of she or,g,nal Slondord Od Company
Faunded ,n Cleveland. Oh,o ,n 1870
Shirley R. McCurry
INFORMATION CONTROL
Well Records LR2-1
· Standard Alaska ~
t Product,on Company %~
900 East Benson Boulevdt~.
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
December 12, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-13 (22-03-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perform a cement squeeze and reperforation of the
well.
Yours very truly,
JAB: JAM
Enclosures (9)
cc: L. Burke (MB12-1)
J-13 Well File
oduction Engineering
A umt of the or,g:nal Standard O,I Company
Founded ,n Cleveland, Oh,o, ,n 1870
STATE OF ALASKA
SKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon Suspend ~ Operal~on Shutdown ~ Re-enter suspended well__
Alter camng ~ Repair well ~ Plugging ~ Time extenaon ~ Stimulate ~
Change approved program ~ Pull tubing ~ Vanance~ Perforate~ Olher X
5. Type of Well:
Development X
Exploratory
Str~graphic
Service
6. Datum elevation (DF or KB)
KBE = 69.07 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J- 13 (22-03-11-13)
9. Permit number
80-83
10. APl number
50- 029-20497
11. Field/Pool
Prudhoe Oil Pool
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1049' SNL, 803' WEL, SEC. 09, T11N, R13E, UPM
At top of productive interval
1640' SNL, 2915' WEL, SEC. 03, T11N, R13E, UPM
At effective depth
1384' SNL, 2639' WEL, SEC. 03, T11N, R13E, UPM
At total depth
1338' SNL, 2601' WEL, SEC. 03, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11800 feet Plugs (measured)
true vertical BKB 9464 feet
Effective depth: measured 11675 feet
true vertical BKB 9354 feet
Junk (measured) fill at 11675'MD (09/88)
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 12 c.y. 137
Surface 2643 13 3/8 3720 c.f. 2670
Intermediate 10753 9 5/8 1665 c.f. 10780
Production --
Liner 1531 7 427 c.f. 10264-11795
Perforation depth: measured 11146'-11168', 11178'-11198', 11208'-11238', 11248'-11278'
true vertical subsea
8902' - 9012' (four intervals)
Tubing (size, grade, and measured depth) 7; L-80 to 10226' with 4 1/2" tailpipe to 10333'
True vertical depth
BKB
137
2670
8607
8218-9460
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 10226'; 4 1/2" SSSV & insert at 2077'
13. Attachments
Description summary of proposal X Detailed operations program
BOP sketch
14. Estimated date for commencing operation
December 1988
16. If proposal was verbally approved Oil X Gas__
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed~//,/~/~-~ ~/~.F~ Title Manager Production En~7ineering
/'/. ' - ~/(.,/ FOR COMMISSION USE ONLY
Con~t~ns of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test~
15. Status of well classification as:
Suspended
Approved by order of the Commission
Form 10-403 Rev 06/15/88
/2-
I Approval No. ~'~:~
Subsequent form required
Copy
Returned -
ORIGINAL SIGNED BY /~,~ .._./~/,., .- ~ ~.
LONNIE C. SMITH ucm~;~,oner Date /
SUBMIT IN TRIPLICATE
J-13
NRWO PROCEDURE
1) Perform Tubing Acid Wash.
2) Flow well back.
3) Perform perforation breakdown with ballsealers.
4) Flow well back.
5) Install/Perform IUD.
6) RU CTU and pressure test to 4000 psi.
7) Reverse out sump fluids to about 11685 or hard
fill.
8) Fluid pack the wellbore with PW.
9) Pump Cement with surfactant/mutual solvent
preflush.
10) Perform cement squeeze.
11) Contaminate cement in the wellbore.
12) Reverse out contaminated cement and replace with
clean PW.
13) WOC.
14) Add perforations as follows: 11,293'-11,310' MD
(reference BHCS 9/28/80).
15) POP and test.
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Of'~
Blind Rams
Cutter Rams
2' Chlcksan (Kill LI-~e)
Slips
Pipe Rams
Pump-In Sub
W ell Head
Swab Val~e
"~'L..-'
(Circulate/Returns)
SIondo,d AIQq. I. ,o {
PO BOa, 19661~P
A,whc~ocje AIo,,Lo 99519 ~1~
(gO/! ~6.4 ~ I I I
TO:
HOUSTON
ARCO
CHEVRON
E~XON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
I NOEXED
..i._._I
S-i'ANDARD
ALASKA PRODUCTION
Date: I0/10/88
T;: 79398
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt
signing a copy of this letter and returning It to this office:
C-18
D-07
P-13
E-08
F-01
G-01
G-07
H-28
J-13
K-03
K-09
N-0I
N-02
M-05
M-16
R-10
U-04
U-05
V-19
Z-14
Z-15
Static 09/24/88 GO
Static 09 / 24 / 88 GO
Static Gradient 09 / 25 / 88 Otis
Static Gradient 09/25/88 Otis
Static Gradient 09/25/88 Camco
~c 09/26/88 GO
Static Gradient 09/24/88 Camco
Static Gradient 09/24/88 Camco
Static 09/25/88 GO
Static Gradient 09 / 22 / 88 Camco
Static Gradient 09 / 28 / 88 Camco
Static Gradient 09/22/88 Camco
Static Gradient 10/03/88 Camco
Static Gradient 10/02/88 Camco
StSc Gradient 09/30/88 Camco
Flowing Gradient 10/03/88 Camco
Stair Gradient 09/28/88 Camco
Static Gradient I 0 / 02 / 88 Camco
StSc Gradient 10/02/88 Camco
Static Gradient 09/30/88 Camco
Initi~ Static Gradient 09/30/88
Sta~c Gradient 09/29/88 Camco
Ot~
Race i ved
,,,,,, o,, c~.~., Nlchorage
Jennifer Dietz
INFORMAT I ON CONTROL
Wel I Records I. R2-1
S~ando,d Alaska
P.O. Box 196612
An~ho~oge. Alosho 99519-6612
(9O7) 564-5 ! ! !
DAIJ.~S
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Da'f'e: 06/05/87
· ri: 77952
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The roi lowing material Is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of thls letter and reYurnlng IY to this office=
B-9
B-16
C-26
F-5
F-27
H-3
J-5
J-13
J-13
J-23
J-23
N-3
N-3
N-7
R-6
S-6
Race i ved
Date
Injection Profile 05/20/87 #1 9800-10058 Camco 5"
Collar Log 05/19/87 #1 9900-10250 GO 5"
DFT 05/11/87 #1 10500-11760 GO 5"
Production Profile 05/17/87 #1 11100-11350 Camco 5"
CBT 11/06/86 #1 9200-10620 Sch 5"
Cont. Flow Survey 05/11/87 #1 9850-10137 GO 5"
Cont. Flow Survey 05/17/87 #1 9950-10260 GO 5"
Borehole Audio Tracer Survey 05/03/87 #1 2000-11600 GO 2"
DFT 05/03/87 #2 Surf-il609.5 GO 2"
Borehole Audio Tracer Survey 05/05/87 #1 1000-9800 GO 5"
Temp. 05/05/87 #1 39-9800 GO 2"
DFT 05/12/87 #1 11100-11700 GO 5"
GR 05/12/87 #I 9100-11700 GO 5"
Caliper 05/07/87 #1 10100-10571 GO 5"
Injection Profile 05/14-15/87 #1 9900-10350 Camco 5"
Cont. Flow Survey 05/10/87 #1 9950~10650 GO 5"
// /~x~ a Oil & Gas Cons. Commission
'
Victor±a Aldr±dge
I NFORNAT I ON CONTROL
Ne I I Records LR2- I
A umt of the o~'~nol Standard Od Compony
Founded ,n Clevelond Ohm ,n 1870
Standard Alaska (
P~oduchon Company
900 East Ben~o,, Roulevo,d
PC) 6o, 196612
A,~¢horo~je Ah~k~ 99519 661 ~
DALLAS
ARCO
CHEVRON
EXXON
TEXACO D.-te:
TO: MOBIL Ti:
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
INDEXE0
STANDARD
ALASKA PRODUCTION
05/11/87
77880
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning If to this office=
B-16
D-3
G-4
$-13
R-26A
Tubing Puncher 05/01/87 #1 8400-9110 Sch ~'
Perf. Record 04/30/87 #1 10200~10645 Sch 5"
Completion Record 04/26/87 #1 10100-10298 Sch 5"
Temp/GR 04/29/87 #1 0-11685 Sch 2"
Perf. Record 05/04/87 #2 9000-9601 Sch 5"
§87
Rece i ved
uu,,, .......... Victoria Aldr idge
Anchorage i NF~T I ON C~TR~
a~ ....... Wel I Records LR2-1
A ii e o ol 51 j
Founded m (le.eln~*,o ,,, 18~0
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
GETTY
~o SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE (Transmittal Only)
CENTRAL FILES(CC#'s-Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE {9071 265-0000
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 9-22-84
CC#: 75755
REFERENCE
S0~~__ASE____~D HO___LE F, TRAL LOGS
/The following mater~al is being submitted herewith. Please acknowledge receipt by signing a
ycopy of this letter and returning ~t to this office --
B-17 ~' THERMAL MULTIGATE DECAY 7-23-84 #1 10250-11250
D-18~ THERMAL MULTIGATE DECAY 6-23-84 ~1 10550-11323
J-13V Thermal Multigate Decay ' 6-23-84 #1 10800-11710
R-19 Thermal Multigate Decay 7-23-84 ~1 9450-10252
S-5 ~ THERMAL MULTIGATE DECAY 6-26-84 #1 10000-10685
S-13,~ Thermal Multigate Decay 6-26-84 #1 10750-11380
Welex
Welex
Welex
Welex
Welex
Welex
5"
5"
5"
5"
5"
(4/82)
RECEIVED
DATE
~ ~, ~ ~eve-opmenc ~eozogy
19 ,~
~- Well Records
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
EXXON
TO
PHILLIPS
CENTRAL FILES (CC#' s-Transmittal Onl7
INDEXED
3111"C"STREE~
ANCHORAGE. ALASKA
TELEPHONEI907i265-O000
MAIL POUCH6-612
ANCHORAGE. ALASKA 99502
Date: 9-5-84
CC#: 75699
REFERENCE
SOHIO MAGNETIC LIS TAPES & LISTINGS
The following material is beIng submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office'--
SFO/UNIT/STATE:
*J-11 TDT-LIS w/ Listing 7-12-84 ~1 C.H. Sch~69430
*J-13 TDT-EDIT w/ Listing 7-13-84 #2 C.H. Sch#69410
*M-16 TDT-EDIT w/ Listing 7-7-84 #2 C.H. Sch#69406
TAPE POS.f
03155
03163
03158
(4/82)
*SFO & EXXON: An Asterisk.(*) next to a listing abo~e means you should have
received the Tape(s) and Listing(s) directly from the respective service company.
Please confirm this ~' ~' ~- ', , ''
~' ~ Develo~ent Geolosy
DATE ' ' ~S Well Records
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907! 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO SFO/UNIT/STATE: GETTY
(-Marathon) HOBIL
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES (CC#' s-Transmittal Only)
Date: 8-30-84
CC#: 75680
REFERENCE.
RI__~O CASE~_D HO_~___LE__ FINAL LOGS
e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
J-il
J-12
J-13
R-12
S-15
R-13
CNL
TDT-M
TDT-M
TDT-M
TDT-M
TDT-M
Compl. Rec.
Compl. Rec.
Compl. Rec.
GCT Gyro Well
GCT Gyro Well
Perf. Record
7-18-84 #2 11000-11896 Sch 5"
7-4-84 #1 11250-11872 Sch 5"
6-26-84 #1 8850-9265 - - Sch .~ ~" .....
7-12-84 #1 10100-10970 Sch 5"
7-14-84 #1 9150-10172 Sch 5"
7-13-84 #2 10800-11717 Sch 5"
7-7-84 # 2 10750-11630 Sch 5"
7-9-84 %0 9590 Sch 5"
7-18-84 %I 10822-10851 Sch 5"
7-19-84 #1 11022r110__60 ....... Sc.h__ 5"
7-5-84 #1 9950-10879 Sch 5"
7-4-84 #1 - - -11846 Sch -
6-26-84 #1 - - -9294 Sch -
7-22-84 #1 8700-10108 Sch 5"
(4/82)
RECEIVED
DATE
...... -,,, ~u,io. ~-.u~.~sl0rl Carolyn Bishop
Anchorage Development Geology
~9 Well Records
*F-3 %/
F-9~
J_13w'
,R-17'~
(~
SOHIO ALASKA PETROLEUM COMPANY
SON IO RESTR] C ED -
' ARCO ,
~o EXXON
PHILLIPS
SFO
REFERENCE:
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL. POUCH 6-612
ANCHORAGE, ALASKA 9950:2
Date: 1/27/82 # 1346 '
SOHIO MAGNETIC LIS TAPES & LISTINGS ........
The following material ~s being submitted herew,th Please acknowledge receipt by signing a
copy of thins letter and returning mt to this ofhce:--
(Sch) CH-CNL #62453 12/28/81 #1
(Sch) CH-CNL #62451 12/29/81 #1
(Sch) CH-CNL #62452 12/28/81 #7
(Dres) CH-CN/MS ECC#1186 12/22/81 #--
(Dres) CH-CN/MS ECC#1187 12/21/81 #--
(Sch) OH-DIL/BHC/FDC/CNL #62456 1/1/82 #1&~
Carol/~ri~e ~r
De ve 1 ~ ~ ,~ ~'~ e o 1 ogy
Well ~Srds HQ 4-5
(
SOHIO RESTRICTED
SOHIO ALASKA PETROLEUM COMPANY
ARCO - __ -
TO
SFO/UNIT/STATE: ~ -
(-Marathon)
,.,
~oAE T~r~ns,m,,it~,ta, i O,nlv, ~
311 1 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE 1907) 265-0000
MAIL POUCH 6-612
ANCHORAGE, ALASKA 9950:2
Date: 1/15/82 ~ 1326
REFERENCE
SOHIO FINAL DAT~
followIng material ~s being submitted herewIth. Please acknowledge receipt by signing a
copy of th~s letter and returning it to this office:--
SFO/UNIT/STATE: (-Marathon)
FINAL CASED HOLE LOGS
G-5
J-13
Spinner (Otis) 12/24/81 #1
CNLog/GR/MS (Dres) 12/21/81 #1
5{I
5"
~nt Geology
~,':~ ~~o rd s
SOHIO ALASKA PETROLEUM COMPANY
SOH IO COIIFIDENTIAL
31 1 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE {907) 265-0000
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
ARCO
TO EXXON Date: 9/10/81 # 1043
PHILLIPS
SFO
REFERENCE
/SOHIO MAGNETIC LIS TAPES
i The following matermal is being submitted herew,th Please acknowledge receipt by sigmng a
, ~ copy of this letter and returmng it to this office'--
:,/SF0/.A?P-.~f~ j Computerized tapes ~
' ~13' Ma~Lis~er) ,r ~,.,e.V..~ ,~ 30/01 #1
,' __~* B- 14 " ' swer) #62057 7 30/8 ,-.
SFO/AE '
Magnetic LIS Tape & Listing #62057 7/30/81 #1
" " " " #62136 8/22/81 #2
" " " " (Final) #62132 6/7/81 #5
" " " ," (Final) #62131 8/22/81 #1
" " " " ¢/62135 8/25/81 #2
SOHIO ALASKA PETROLEUM COMPANY
SOH I 0 CO 'IF I DENT I AL
3111 'C S'[REET
AI',ICHORAGE, ALASKA
TELEPHOr,;E (907) 265 0000
MAIL POUCH 5 612
ANCHORAGE. ALASKA 99502
~o STATE
Date: 8/27/81 ~ 1015 C
REFERENCE
f~ SOHIO MAGNETIC LIS TAPE
The following matenal ts being submated herewith Please acknowledge rece,pt by s~gn~ng a
copy ofthtsletterandreturn~nglttoth~sofhce:--
N-13 '~' Corrected LIS Tape & Listing
N-11 LIS Tape & Listing
N-14 LIS Tape & Listing(Corrected)
F-7 / LIS Tape & Listing
Y-10,' LIS Tape & Listing
G-13i LIS Tape & Listing
Kuparu~ St.22-11-12 LIS Tape & Listing
D-15~ LIS Tape & Li~ting
R-9 LIS Tape & Listing
Y-12j LIS Tape & Listing
J-13' LIS Tape & Listing
F-2 LIS Tape & Listing
M-12 LIS Tape & Listzng
H-16't' LIS Tape &,Eistzng
#61732 6/18/81 #2
#61776 5/9/81
#62007 7/7/81 Hi
#62036 7/21/81 #4
#62042 7/18/81 #1
#62043 7/23/81 #1
#62045 7/26/81 #1
#62051 6/27/81 #2 ~'
#62052 7/24/81 #i
#62055 7/25/81 #2
#62056 7/30/81 #1 '
~62060 8/1/8] #1
#62071 7/31/81 #1
#62075 7/19/81 #1
S0H I O CO[ :l- I DE[iT I AL
SOHIO ALASKA PETROLEUM COMPANY
3111 C S1REET
* ANCHORAGE ALASKA
ARCO ---
~vrc~o iLLEPHO;JE (907) 265-0000
~ . -- ~'.IAIL POUCH 6 612
ANCHORAGE. ALASKA 99502
St.~,~: · --
TO SFO/UNIT/SIATE~:~I __ ' ' -- Date: 8/21/81
P~ll,p~ ..... - -'
(-Maratbon) ~oAE _ . ...._
#1000 F
REFERENCE
hlheSOHIO FINAL DATA CAsed hole final data
follow,ag material,s being subm~ttedherew~th Please acknowledge receipt by s~gn~ng a
copy of th~s letter and returning ~t to th~s office --
f-
B-14
D-3 /
F-2
F-7
J-13 v,/
TDT-H (Sch) 7/30/81 [Il
Sp~nner (Camco) 7/7/81
TDT-M (Sch) 8/1/81
TDT-M (Sch) 7/21/81 [/4
TDT-M (Sch) 7/30/81 ~/1
EPL (Sch) 8/3/81 [/2
(Sch) 7/21/81 [/1
(Sch) 7/19/81
Kuparuk St.)TDT~M
22-11-12~/)EPL
5~
5"
5"
5"
5"
5"
5"
5"
/
i( F. C F:{V E D
SOH I 0 'CONF I DENT ! AL
SOHIO ALASKA PETROLEUM COMPANY
TO
SFO/UNIT / STATE ~ ........ -
p~.,p, ...... -
TELEPHONE 19
MAIL POL
ANCHORAGE,
co~,~,m~F -
I ~C-'~
~ ~ STZT ~-'C
Date:6/18~81 ~ ~
REFERENCE
SOHIO FINAL DATA
The folio.wing material is being subm,tted herew,th Please acknowledge receipt by signing a
copy of thIs letter and' returnmng it to this ofhce:-
SFO/UNIT/STATE (-Marathon): PRESSURE SURVEY DATA
~/~.~1~ Bottom Hole Pressure Data Form & Survey
~ II !1 II !1 I! II
(Otis) 6/10/81
(Camco) 5/22/81
RECEIVED ('.._/ ,,~' - -- Carol Krieter
DATE 19 c~/ Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3'111 "C" STREET
A,",CHORAG E, ALASKA
TELEPHONE (907) 265 0000
MAlL POUCH 6-612
ANCHORAGE, ALASKA 99502
June 10, 1981
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Wells J-12 and J-13
Enclosed,' in duplicate, are the following forms for the above-
named wells:
1. Form 10-407, Completion Report;
2. Form 10-403, Sundry Notices and Reports on Wells;
e
Form 10-404, Monthly Report of Drilling & Workover Operations.
GJP:JLH: ja
Attachments
Yours very truly,
G. J. Plisga
District Field Engineer
cc: Well File #17
S. R. Bundy
A. E. Leske
Geology
RECEIVED
JUN 1 1 1981
Al3ska Oil & Gas Cons. Commission
Anchorage
~ STATE Of ALASKA
ALASKA ._ AND GAS CONSERVATION C MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Class~f~cat,on of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 Permit Number
Sohio Alaska Petroleum ~y 80-83
3 Address 8 APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20497
4 Location of well at surface 9 Umt or Lease Name
1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM Prudhoe Bay Unit
At Top Producing Interval 10 Well Number
1634' SNL, 2808' WEL, Sec. 3, TllN, R13E, UPM J-13 (22-03-11-13)
At Total Depth ' 11 Field and Pool
1338' SNL, 2601' WEL, Sec. 3, TllN, R13E, UPM Prudhoe Bay
5 Elevat,o. ,n feet (,nd,cate KB. DF. etc ) I 6 Lease Des,gnat,on and Set,al No Prudhoe Oil Pool
KBE = 69.07' AMSLI ADL 28281
12 Date Spudded 13 DateT D Reached 14 Date Comp.Susp orAband 15 Water Depth. ~f offshore 116 No of Complet,ons
9/7/80 9/27/80 3/26/81 feet MSLI one
17 Total Depth(MD+TVS)18PIugBackDepth(MD+TVD)19 Directional Survey I 20 Depth where SSSV sot I 21 Thickness of Permafrost
11800 'MD 9464 'TVD 11749'MD 9419'TVD YES [~ NO [] 2077 feet MD 2085'
22 Type Electric or Other Log~ Run
DIL/GR, DIL/'L_L8/SP/GR, BHCS/GR, FDC/CNL/Cal/GR, CBL/VDL/GR/CCL
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE ITOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
,
20"x30" Insulated Conducto;$urface 110' 36" 12 eu.vds.
13 3/8" 72~ L-80 Surface 2670' 17 1/2" 3720 cu.ft. Arc~_i~_
9 5/8" 47~ T~-80 .qurf~.~_ ]~780' 12 1/4" 1535 cu.ft. Class G;130cu.ft.Arcticset
7" 299 L-80 10264' 11795' 8 1~2" 427 cu.ft. Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, s~ze and number) MD TVD SIZE DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool - Top: 1114---6 ' 8902 ' 7"/4 1/2" 10333 ' 10226 '
Bottom: 11278' 9012'
* 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
:[1146-11168 'BKB 0.5"@6spf (Ref.BHCS/GR, 9/28/80 IDEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
:11178-'11198 'BKB ,, ,, ( ,, )
11208-11238,BKB ,, ,, ( ,, )
:[1248-11278'BKB ,, . ( ,, )
* Perforated @ 2spf increments in continuous operatio.n
27 PRODUCTION TEST
Date F~rst Production Method of Operation (Flowing, gas I~ft, etc )
3/26/81 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press 24-HOUR RATE I~
28 CORE DATA
Brief description of I~thology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps
None,/,,~,
Form 10-407 Submit m duphcate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
29 30
GEOLOGIC MARKERS FORMATION TESTS
NAME Include ~nterval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUEVERT. DEPTH GOR, and t~rne of each phase
BKB Subsea
Sag River SST 10874 ' ', 8611 '
Shublik 10927' 8653'
Ivishak 11025 ' 8733'
31 LIST OF ATTACHMENTS
None
32 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
S,gned ~_~_'J~ -~'~"F T,tle District Field Date /~ ~b /~,
G. JT-Plisg~- Engineer - / - / '
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well..completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water ~njection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ co.mbustion.
Item 5 Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
g~ven i~ other spaces on th~s form and in any attachments.
Item 16 and 24' If th~s well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
~ - . ~g, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
. STATE OF ALASKA (~'
ALASKA .~ AND GAS CONSERVATION C ~IISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELLX]
OTHER []
2 Name of Operator
Sohio Alaska Petroleum Company
3 Address
Pouch 6-612, Anchorage, Alaska
99502
4 Location of Well
At surface:
1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM
5. Elevation in feet (~nd~cate KB, DF, etc )
KBE = 69.07' AM~L
12
Lease Des,gnat,on and Serial No
AD]', 2R2R]
7 Permit No
80-83
8 APl Number
SO- 029--20497
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
J-13 (22-03-11-13)
11 F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit ~n Triplicate) (Submit ~n Duplicate)
Perforate [] Alter Casing [] ~ Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals were perforated March 26, 1981, using Dresser Atlas 3 1/8"
Jumbo Jet carrier guns at 6 spf:
11146' - 11t68' BKB (Ref. BHCS/GR, 9/28/80)
11178' - 11198' BKB ( " )
11208' - 11238' BKB ( " )
11248' - 11278' BKB ( " )
An SSSVwas set and tested in the ball valve nipple ca. 2000'.
RECEIVED
~aska 0il & Gas Cons. C01r~mja~,t0~
Anchorage
14 I hereby certIfy that the foregoing ~s true and correct to the best of my knowledge
S,gned~ T,tle District Field Engineer
The space below for Commission use Go J. Plisga
Date
Conditions of Approval, if any
By Order of
Approved by, COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1-80
Submit "IntentIons" ,n Triplicate
and "Subsequent Reports" ~rt Duphcate
STATE Or: ALASKA
ALASKA { _ AND GAS CONSERVATION C(]~" MISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
Drdl,ng well
Workover operatton []
2 Name of operator
Sohio Alaska Petroleum Ccmpany
3 Address
Pouch 6-612, Anchorage, Alaska
99502
4 Location of Well
at surface
1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM
5 Elevation ~n feet (~nd~cate KB, DF, etc )
KBE = 69.07' AMSL
6 Lease Designation and Serial No
ADL 28281
7 Permtt No
80-83
8 APl Number
50- 029-20497
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well No
J-13 (22-03-11-13)
11 F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of June ,19 81
12 Depth at end of month, footage drdled, hsh~ng jobs, d~rect~onal drdl~ng problems, spud date, remarks
13 Casing or liner run and quantities of cement, results of pressur9 tests
14 Coring resume and brief description
15 Logs run and depth where run
1 6 DST data, perforating data, shows of H2S, m~scellaneous data
See attachment.
I~ECEI VED
JUN1 1 1981
Alaska Oil & 8as Cons.
Al~Chora~ C°m~i$$io~
17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
SIGNED --.- _ _ T~TLEDistrict Field Engineer DATE I
NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be fded tn c~uuphcate w~th the Alaska
Od and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise d~rected
Form 10-404
Rev 7-1-80
Submtt m duphcate
PERFORATING DATA - Well J-13
March 12, 1981:
Pressure tested tubing and inner annulus.
March 26, 1981:
Rigged up Dresser Atlas and perforated the following
intervals using 3 1/8" Jumbo Jet carrier guns at
6 spf:
11146' - 11168' BKB (Ref. BHCS/GR, 9/28/80)
11178' - 11198' BKB ( " )
11208' - 11238' BKB ( " )
11248' - 11278' BKB ( " )
Put well on production.
June 6, 1981:
Shut well in to prepare for static pressure survey.
June 8, 1981:
Ran static pressure/temperature survey at 8800' TVDss.
June 9, 1981:
Set and tested SSSV in ball valve nipple ca. 2000'.
Well on production.
RECEIVED
JU~ 1 1 1,981
· as/~ 0;1 & Gas Cons. Co~nrniss/o~
AnChorage
SOHIO IDENT]AL
SOHIO ALASKA PETROLEUM COMPANY
ARCO
31 11 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-OOOO
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
To SFO/UNIT/STATE:~ ..... -- Date: 5/19/81 # 806
_
_ £ i. I i iii i
o
__
I ! Il_ -- I
REFERENCE
-
~ SOHIO FINAL DATA
// The follow,ng material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
_
SFO/UNIT/STATE: CASED HOLE 'FINALS:
(-Marathon) '
A-9 ACBL/VDL
4/27/81
H-2 Spinner 4/26/81
H.-2 TDT-M 4/24/81
J-13 Spinner 4/20/81
N-1 Spinner 4/25/81
#1 5"
#1 5"
#3 5"
#-- 5"
#1 5"
DATE
Alaska Oil & Gas Cons. Commission
Anchorage
Carol Krieter
Development Geol.ogy
Well Records
SOHIO ALASKA PETROLEUM COMPANY
December 16, 1980
I I co~iE~
I -I COM~L_l
3;11 "C" STRE~ET I RES ENG
AHCHORAGE., AL~'I~A] ENq~
/-,NCHO P AG E,
I ~ GEbL%
Z.,._ J ST~.T TEC
"~l STAT TEC
CONFER:
FILF:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
RE: Wells Y-3, J-13, X-10, X-Ii, X-12, X-13
Gentlemen:
Enclosed, in triplicate, are Forms 10-403, Sundry Notices
and Reports on Wells, for the above-referenced wells. These
notices contain our proposals to perforate the wells.
G~. js very truly,
k~ Distr ict-Pield Engineer
G/P:~: ja
Enclosures
RECEIVED
cc: Well File #17 S. R. Bundy
A. E. Leske
DE,., ! 9 ]980
Alaska 0il & 6as Cons. 6ommissior~
Anchorage
STATE OF ALASKA
ALASK/~' ~L AND GAS CONSERVATION C( MMISSION
SUNDRY hO¥1CE$ AND REPORTS ON W' LLS
DRILLING WELL
COMPLETED WELL []
OTHER []
2 Name o~ Opera~or
Sohio Alaska Petroleum ~ny
3 Address
:Pouch 6-612, Anchoraqe, Alaska
4 Local,on of Well
99502
At surface: 1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM
5 Elevation ~n feet (,nd~cate KB. DF. etc.)
KBE = 69.b7' AMSL
Lease Des,gnatlon and Serial No
12
ADL 28281
7 Pe,m~t No
80-83
8 API Number
so- 029-20497
9 Umt Or Lease Name
Prudhoe Bay Unit
10 Well Number
J-13 (22-03-11-13)
11 F,eld and Pool
Pr udhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not.e. Report. or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit in Trlphcate) (Subm,t m Duplicate)
Perforate [~ Alter Casing [] ~ Perforat,ons [] Altering Cas,ng []
Stimulate [] Abandon [] St im ulat ion [] Abandonment []
Repa,r Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple complet,ons on Form 10-407 w,th a submitted Form 10-407 for each completion.)
13 Describe Proposed or Completed Operations (Clearly state all pert,nent details and g~ve pert,nent dates, mcludmg est,mated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals will be perforated during January/February, 1981, using
GO Int'l. 3 1/8" carrier guns at 4 spf:
11146' - 11168' BKB (Ref. BHCS/GR, 9/28/80)
11178' - 11198' BKB ( " )
11208' - 11238' BKB ( " )
11248' - 11278' BKB ( " )
An SSSV will be set and tested in the ball valve nipple ca. 2000'.
RECEIVED
Alaska 0~1 & G2s C0q3, Comm~ssi0n
reby~ ~ Apchoragc
14 I he f ~s true a~d correct to the best of my knowledge
S,gn~ ~~~ ~ ~ T,tle District Field ~gineer
The s c~belo~ fo]~Co m,sslon use GOJ. Plisga
Cond s of App, uv~,, ,f any.
Form 10-403
Rev. 7-1-80
By Order of
Approved by COMMISSIONER the Comm,ss,on
.
Date
Approved Copy
~.etdrned
Date / 2--//?~'/~
Submmt "lnten~ons"'~n Tr,phcate
and "Subsequent Reports" ~13 Duplicate
SOHIO PETROLEUM COMPANY 3~ "c~j~:.
Division of Sohio Natural Resources Company ANCHOR;GEJ
SOHIO-BP ALASKA PRODUCTION DIVlSi ~ MAIL: POU~?_
s~o/~z~/st~/ ~ ~ z0/8/80
~]]~ ~ (10/~/80 State)
~o ~
REFERENCE:
SOHIO OPEN HOLE FINAL DATA
(~The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
'O/UNIT/STATE:
J-13 DIL/SFL 9/23/80 & 9/28/80 ¢t1&2
J-13 BHCS 9/28/80 ¢12
J-13 FDC/CNL 9/29/80 ¢~2
3-13 FDC 9/29/80 #2
2" & 5"
2" & 5"
2" & 5"
2" & 5"
,TATE ONLY: J-13
J-13
.~..J-13
Sidewall Summary Sheet
Magnetic Single Shot Survey
Gyroscopic Survey
lO/7/80
lo/b/80
Carol Krieter
Well Records
DATE
19
Recli-Kwtk, Quality Litho
SOHIO ALASKA PETROLEUM COMPANY
October 23, 1980
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well J-13 (22-03-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations for the above-named well
for the month of October, 1980.
WRH:ja
Enclosures
cc: Well File #17
Yours very truly,
Acting District Drilling Engineer
" STATE OF ALASKA
ALASK_~ 'L AND GAS CONSERVATION CC. IMISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1 Drdl~ng well [] Workover operation []
2 Name of operator 7. Permit No.
Sohio Alaska Petroleum Company 80-83
3 Address 8 APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20497
4 Location of Well 9 Umt or Lease Name
at surface Prudhoe Bay Unit
1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM* 10WellNo
J-13 (22-03-11-13)
11 Field and Pool
*Corrected Prudhoe Bay,
5 Elevation ~n feet (~nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No Prudhoe Oil Pool
KBE = 69.07' AMSLI ADL 28281
For the Month of. October , 19 80
12 Depth at end of month, footage drdled, hshmg jobs, d.rect~onal drdl~ng problems, spud date, remarks
Directionally drilled 8 1/2" hole to 11800'. Ran open hole logs and took 62 sidewall
samples.
13 Casing or I~ner run and quant~tms of cement, results of pressur9 tests
Ran 38 jts. 7" 29# L-80 Buttress casing to 11795'. Cemented with 427 cu.ft. Class G
cement. Cleaned out to 11749', tested casing to 3000 psi, okay. Changed well over to
NaC1, ran CBL. Ran 264 jts. 7" 26# L-80 IPC tubing with 3 jts. 4 1/2" CS Hydril tailpipe.
Landed tailpipe at 10333' with ball valve at 2077'·
14 Coring resume and brief description
Sidewall samples taken· Report will be forwarded on well completion.
15 Logs run and depth where run
CBL/VDL/GR/CCL at 11800'
1 6 DST data, perforating data, shows of H2S, m~scellaneous data
Installed and tested tree· Displaced tubing to diesel, set packer at 10226'. Tested
tubing to 3500 psi, okay. Released rig at 0800 hours, 10/4/80·
17 I hereby certIfy tha he rue anO correct to the best of my knowledge
D~.~ i~/~ Acting District
I
SIGNE ,7 ~o · u;,,~- TITLE Drilling Engineer DATE
fl · ,.i.~, e 4. a,,..,.1 , ,-.,,..,. ....
NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be fded ~n duphcate w~th the Alaska
Od and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise d~rected
Form 10404 Submit ~n duplicate
Rev 7-1-80
WELL: J-13 pg 1.
DEPTH
11450'
11420'
11405'
11400'
11385'
11380'
11350'
11340'
t1335'
[1330'
11325'
I1320'
11275'
[1250'
[1210'
t1165'
t1135'
t1095'
t1040'
11035'
11030'
11025'
10930'
10925'
10920'
10905'
10885'
10880'
10875'
10870'
11685'
11657'
11437'
11615'
11605'
11563'
11541'
11527'
11506'
11473'
11430'
11420'
11380'
11325'
11300'
[1250'
t1230'
~1210'
[1184'
[1147'
tll14'
t1077'
t1062'
11035'
11017'
10984'
10958'
10931'
10904'
10870'
SIDEWALL CORE REPORT
RECOVERY
~o
~o
~o
~o
No
~o
~o
~o
~o
~o
~o
LITHOLOGY
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
Shale
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
Shale
SS
SS
SS
Shale
WELL: J-13 pg. 2
SIDEWALL CORE REPORT
DEPTH
11715'
11696'
11650'
11628'
11607'
11584'
11554'
11516'
11492'
11464'
11456'
11415'
11370'
11316'
11296'
11284'
11262'
11231'
11212'
11195'
11175'
11155'
11105 '
11086 '
11046 '
11005'
10976'
10915'
10894'
10858'
RECOVERY
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
No
Yes
Yes
No
Yes
Yes
No
No
No
No
Yes
Yes
No
Yes
Yes
No
Yes
Yes
No
Yes
LITHOLOGY
Shale
Shale
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
Siltstone
SS
Shale
SOHIO ALASKA PETROLEUM COMPANY
October 23, 1980
MAIL. POUC~I ~6-~1g ~_g~ I
ANCHORAGE, AL~
CONFIDEN~
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well J-13 (22-03-11-13)
Enclosed, in duplicate, is Form 10-407, Completion Report,
for the above-named well together with the Well History,
Well Logs, Directional Surveys, and Sidewall Core Data
Sheet.
This well has been suspended pending perforating operations.
WRH: ja
Enclosures
cc: Well File #17
Geology
Yours very truly,
Acting District Drilling Engineer
,., STATE OF ALASKA ('
ALAsK .; AND GAS CONSERVATION C MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Serv,ce Well
OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 Permit Number
Sohio Alaska Petroleum Company 80-83
3 Address 8 APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20497
4 Location of well at surface 9 Umt or Lease Name
1049' SNL, 803' WEL, Sec. 9, TllN, R13E, UPM* Prudhoe Bay Unit
At Top Producing Interval 1
1705' SNL, 2927' WEL, Sec. 3, TllN, R13E, UPM J-13 !(22-03-11-13)
At Total Depth il F~eld and Pool
1338' SNL, 2601' WEL, Sec. 3, TZ1N, R13E, UPM *Corrected Prudhoe Bay,Prudhoe Oil Pc.(
5 Elevat~on;t~e~t (md,cate KB, DF, etc ) ~ 6 Lease Des~gnat,on and Ser,al No
KBE =--(69/67'AMSL:BF=41.87 'AMS~ ADL 28281
12 Date Spuddedk"/ 13 Date T D Reached 14 Date Comp, Susp or Aband 15 Water Depth, if offshore 116 No of Completions
9/7/80 9/27/80 10/4/80 feet MSL
17 Total Depth (MD+TVD) 18 Plug Back Septh (MD+TVS)19 $1rectlonalSurvey I 20 Depth where SSSV sot I 21 Thickness of Permafrost
ll800'MD 9464'TVD 11749'MD 9419'TVD YES~ NO[] 2077 feetMD 2085'
22 Type Electric or Other Logs Run
DIL/GR, DIL/LLB/SP/GR, BHCS/GR, FDC/CNL/Cal/GR, CBL/VDL/GR/CCL
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulate~ Conductc,r Surf. 110' 36" 12 cu.yds. Arcticse' concrete
13 3/8" 72~ L-80 Surface 2670' 17 1/2" 3720 cu.ft. Arctics,~t II
9 5/8" 47~ L-80 Surface 10780' 12. 1/4" 1535 cu.ft. Class G 130 cu.ft. Arctics
7" 29# L-80 10264' 11795' 8 1/2" 427 cu.ft. Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
~nterval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD)
7"/4 1/2" 10333' 10226'
None
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
27 PRQDUCTION TEST
Date F~rst Production Method of Operation (Flowing, gas I~ft, etc )
Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF. WATER-BBL OIL GRAVITY-APl (corr)
Press 24-HOUR RATE
28 COP E DATA
Br~efdescr~pt~onofl~thology, poros~ty, fractures, apparent d~ps and presence of o~l, gasorwater Subm~tcorech~ps
See attached sheet.
,,,
.ol
t I
Form 10-407 Submit in duphcate
Rev 7-1-80 CONTINUED ON REVERSE SIDE { ~,,
29 30
GEOLOGIC MARKERS FORMATION TESTS
NAME Include ~nterval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUEVERT DEPTH GOR, and t,me of each phase
BKB Subsea
Sag River SST. 10874' 8611'
Shublik 10927' 8653'
Ivishak 11025' 8733'
31 LIST OF ATTACHMENTS
Well History, Well Logs, Directional Surveys, Sidewall Core Data Sheet ...
32 I hereby certify that ~ Is true and correct to the best of my knowledge
__~'~~ Acting'District
S,gned T,tle Drilling Enqineer Date /
INSTRUCTIONS
General' This form is designed for submitting a complete a~d correct well completion report and log on
all types of lands and leases in Alaska.
Item 1 Classification of Service Wells: Gas injection, water ~nject~on, steam injection, air injection, salt
,water disposal, water supply for ~njection, observation, injection for inositu combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachn~ents.
Item 16 and 24. If th~s well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of th~ cem~ntin9 tool
WELL J-13 (22-03-11-13)
WELL HISTORY
September, 1980
Spudded well at 1200 hours, September 7, 1980. Drilled 17 1/2" hole to 2686'.
Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2668'. Cemented with 3720
cu.ft. Arcticset II cement. Installed and tested BOPE. Drilled out to 2670'.
Ran leak-off test to 0.64 psi/ft, gradient. Directionally drilled 12 1/4" hole
to 10786'. Ran open hole logs. Ran 276 jts. 9 5/8" 47# L-80 Buttress casing
to 10780'. Cemented in two stages: First stage with 1535 cu.ft. Class G cement;
second stage through D.V. packer at 2603' with 130 cu.ft. Arcticset I cement
preceded by Arctic Pack. Cleaned out to 10737', tested casing to 3000 psi, okay.
Drilled out to 10810'. Performed formation competency test to 0.7 psi/ft.
gradient.
October, 1980
Directionally drilled 8 1/2" hole to 11__!_~'. Ran open hole logs and sidewall
cores. Ran 38 jts. 7" 29# L-80 Buttress casing to 11795'. Cemented with 427
cu.ft. Class G cement. Cleaned out to 11749', tested casing to 3000 psi, okay.
Changed well over to 9.6 ppg. Nacl. Ran CBL. Ran 264 jts. 7" 26# L-80 IPC
tubing with 3 jts. 4 1/2" CS Hydril tailpipe. Landed tailpipe at 10333' with
ball valve at 2077'. Installed and tested tree. Displaced tubing to diesel,
set packer at 10226'. Tested tubing to 3500 psi, okay. Released rig at 0800
hours, October 4, 1980.
GREAT LAND DIRECTIONAL DRILLING INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
PAl')
COMPANY
WELL NAME
II]] II
LOCATi~-N~
AL-9-80-D-26
Single Shot 10-7-80
JOB NUMBER
TYPE SURVEY DATE
Kent Asa.v
NAME
Engineer
TIT'LE'
......... ' -~ Si'GNATURE -
DEPTH INTERVAL
1986 11,800
FROM TO
9-7-80
DATES SURVEY WAS TAKEN FROM
9-28-80
TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY
OF YOUR WELL
We have retained a copy of your survey report in our files for your
convenience; however, should you so desire, all copies of the survey report
will be forwarded to you on written request. All surveys are kept in a
locked file and are held in strictest confidence. AdditIonal copies of your
survey report can be made from the original by any blueprint company.
¢C~DLETIO-N REi~6RT .................................. :3 OCT 80-'
SOHIO ALASKA PETROLEU~ WELL J-13
MAGNETIC S[NGLE ~OT SURVEY K B ELEV 69.07
RA01~S OF CURVATURE ~T~'-'OF ~O~PUTATION
C~PUTED F~ GLDD BY FM LINDSEY & ASSOC
RECORD OF SURVEY
ALL CALCULATIONS PERFORMED BY ! B M ELECTRONIC COMPUTER
....... T-RUE ...................................... OOG-EEG
MEAS. DRIFT VERTICAL SUe DRIFT TOTAL COORDINATES C L 0 ,.% U R E $ SEVERITY
DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/IOOFT
0 0 0 0.00 -69.07 N O.OOE 0.00 S 0,00 ~ 0.00 S 0 0 0 ~ 0*000
ASSUMED VERTICAL TO 1986.
1986 0 0-' 1986.00--1916.gT--N-O%OOE" G~OO--S .... ~.OO W ...... O~OG
2066 3 O 2065.96 1996.89 Na0eOOE 1.92 N 0.70 E 2.05 N 20 0 0 E 3.752
2128 5 0 2127.80 2058073 N3OeOOE 5.46 N 3.17 E 6.32 N 30 10
2190 6 45 218gb~8- 2120.4[- NITeOOE'- -11.27'-R ...... ~70-E ..... 12~63-N26 50
2253 9 0 2251,88 2182.81 N17.00E 19-52 N 8.22 E 21,18 N
2365 12 30 2361,90 2292.83 N22,00E 39-21N 15,19 E 42,05 N 21
2467 16 ~0 2&6'eTa. .... 239[~67 N29.OOE ~-61.85 N .... 2~.-99'-~ ..... 67.0?
2560 18 30 2549.55 2480.48 N29.OOE 85.97 N 39.36 E 94.55 N 24 36 12 E 2.688
2731 23 0 2709.42 2640.35 N33.00E 137.87 N 70.55 E 154.88 N 27 5 59 E 2.656
2~25 ~5 15 2795.20~ -2726*I3 ~2B.OOE--170,9T N .... 90'~0~"-E .....
2917 27 15 2877.71 2808.64 N31.00E
3011 30 0 2960.21 2891.14 N31.OOE
3135 31 15 3066.92 2997.85 N31,00E
3259 33 0 3171.93 3102,86 N31.00E
3383 36 0 3274.11 3205.04 N30e0OE
3506 38 45 3371.84 3302.77 N29.0OE
3660 41 30 3489,59 3420,52 N28-00E
3719 43 0 3533.26 3464,19 N28.00E
394~ 44 0 3700. Oq 3631.02 N28iOOE
~476 42 45 4083.15 ~O1~.08 NZg.0OE 1061.20 N
~870 ~1 15 ~375.9~ ~306.87 N32.00E 1288.33 N
206.38 N 110-08 E 233.90 N 28 4 30 E 2.279
244.97 N 133.27 E 278.88 N 28 ~2 50 E 2.926
299.12 ~ I65;80 E - -3~2.00 N 29 O- 0 E .... 1.008
355.6~ N 199.76 E ~07.90 N 29 19 24 E 1.411
416.1~ N 235.40 E 478.11N 29 29 ~6 E 2.435
481.I2-N .... 272~17 E '- 552.77 N'29 29 48-E-- 2.258
568.33 N 319.52 E
603.36 N 338,14 E
743.Iq N- -~I2.qT- E
585.16 E
718.95 E
651.99 N 29 20 41E
691.65 N 29 16 4 E
849.94 N 29 I 54 E
1211.8½ N 28 52 22 E
1q75.36 N 29 9 48 E
1.808
2.542
0-435
0*253
0.50~
SECT "'~
D l STAN,,,E
0.00
1.99
6-31
20.8~
41.08
93.42
~32.86
277.85
406.83
~76.96
650.30
689.79
1207.9~
la71,18
SOH[O WELL J-t3
SINGLE SHOT SURVEY
3 OCT 80
................ ' RECORD OF SURVEY
ALL CALCULATIONS PERFORMED BY I B N ELECTRONIC COHPUTER
- t
TRUE
DEPTH ANGLE DEPTH
O tq
SUB' DRIFT- TOTAL COORDINATES C L 0 S U R E S
SEA DIREC DI STANCE ANGLE
DEG. D M $
5186 /sO 0 46!5.77 4546J70 N~IeOOE X463o75 N
5590 ~9 0 4927e9,0 4858.43 N33eOOE 168Xo67 N
826.45 E
962*61 E
1937069 N 29 47 1~ E
DOG LEG
SEVERITY
DEG/IOOFT
0.417
00316
0.~59
0.177
0.449
7113 41 1~ 608.4,~0 601~.4~ N~4eOOE 2500,Z~ N ~9,~1E 292~,72 N 31 17 14 E 0.167
7306 ~1 0 6229,88 6160,81 N3~eOOE 2606-10 N 1589.~7 E 3052057 N
7927 ~ 0 b6Bb,7~ 6617,6~ N~,OOE 2957.73 N 1820,0~ E 3~72,~6 N ]1 36 22 E 0.~31
~320 ~2 0 69~9~51 b~0,~ N}6,00E ]196,77 N 19870~ E ~76~.19 N }1 52 8 E 2.060
SECTIOa
~ISTANCE
1676080
193306~
2132.19
2367.94
2560048
2b61.20 -
2923069
3050.52
3471.02
3762072
--Bsog'-'~--~S~~'V~J~ ..... b~0,~9--~:~7.OOE--'3320~Z~'-~~'~-~~'91?~29-N 32 3 -1E - 2,5~0 -- 3916,O8---
871~ 58 45 716809~ 7099088 N37.OOE 3458068 N 2183011E 4090004 N 32 13 36 £ 00976 4089.12
8839 58 4~ 7233090 71tldi.,73 N37,OOE 3544002 N 22470k2 E 4196055 N 32 22 50 E 0.000 4195.78
'--89T~-'~5---0---T3Og'iI~--T2~O-~2~I~5~0OI:---3637,-S0 ~---211-5-s~-E----~311.87 fl-32 28 39 E 20886 -- ~t1.2~---
9081 50 45 737109~ 7~02088 N35.OOE 3705041N 2362089 E 4394069 N 32 31 30 E ~0087 4394.09
9926 42 ZS 796~0~2 789~00S N3~.OOE 4202027 N 2707076 E 4999.10 N 32 47 45 E 00732 499B075
106~1 lO ~0 8179~10 8110~0~ N37.OOE ~81,78 N ~973e~6 E 5~6ZeOT N 3~ 58 ~7 i 0,6~ 5~61,87
:1173~ ~9 0 9390,I~ ~3~1.~5 N)8.00E 5083.~3 N 3358e3~ E 609~,50 N 33 ~7 3 i 1,03~ 6092,~0
'THE FOLLOWING INFORNATION IS EXTRAPOLATED TO TD
'11800 29- -0 .... 9&-iFg;Hg-'-qifSO;-SZ~N38.OOE -5109,31 R '-~378~62-'~ ...... 6125037 N 35-28 31 E
0.000 612~.-S7- - i
'BOTTOM HOLE CLOSURE 6125037 FEET AT N 33 28 31E
$(1~410 WELL ,,/"1} ........ SINO..LE SHOT
INTERPOLATED TRUE VERTICAL DEPTHSt COORDINATES AND CLOSURES FOR GIVEN DEPTHS
OCT 8O
........................... TRUE ..........................
CODE MEASURED VERTICAL TOTAL COORD ! NATES
NAME DEPTH DEPTH
C L O $ U R E SUB
STANCE ANGLE SEA
...... D- M-*S ..............
TD -'
.,sol41 o' ~ELL
SINGLE 'SH~S~~- '
OCT 80 ...................
qEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTHe
TRUE
MEASURED"- - VERTICAL--SUB----- HD.:.TVD ...... VERTIC.~'~L--
DEPTH DEPTH SEA DIFFERENCE CORRECTION
TOTAL COORDINATES
469
569
669
769
869
969
1069
1169
1269
1369
1469
1569
1669
1769
169 169. 100 0 0
269 269· 200 0 0
369 ............. 369· .......... ]O(Y .......... 0
469· 400 0
569* 500 0 0
6'6-9· --- 600 ....... 0 ................ 0
769· 700 0 0
869· 800 0 0
969, .... 9 OD-- .......... 0 ...................... 0
0·00 S 0,00
0·00 S OeO0 W
.... 0,;00 $ ........ 0.0'0--'1~
0,00 S 0.00 W
0,00 $ 0.00 W
0.-00 $-- 0~00 W
0,00 $ 0·00
O. O0 S 0·00
0.00 & 0,00 W
0.00 S 0.00 W
0,00 $ ....... O~O0* If
0,00 S 0.00 ¥
0·00 $ 0,00
"' O, 00- S -- - 0 · 00 -W
0,00 S 0,00 W
0.00 S 0.00 W
1069, 1000 0 0
1169- I100 0 0
I269 g----1200 O* O
1369. 1300 0 0
1469, 1400 0 0
...... 1569~ ...... 1-500-- ........ 0 .... 13
1669· 1600 0 0
1769, 1700 0 O
1869
1969
2069
2169
2270
2372
2476
2581
2687
2796
2907
3021
3137
3255
3377
3633
3768
1969. 1900 0 0
2069* 2000 0 0
2169;'- 2100
2269· 2200 1
2369· 2300 3
2469, - 2400
2569· 2500 11 5
2669° 2600 18 7
0·00 S 0-00 ~
2*05 N 0,80 E
.... 9a05 N ....... e-~90- E
22.14 N 9,04 E
40.62 N 15.77 E
.... 63.95 N 27e16- E ......
91.76 N 42,60 E
123e71 N 61.59 E
2769· 2700 27
2869· 2800 38
2969· 2900 52
3060° 3000 * 68
3169, 3100 86
3269- 3200 107
3~69, 3300 ..... 1~3--
3469, 3400 163
3569, 3500 198
9 ............ I60-28 N
11
14
16
1.8
21
3O
202,46 N
249°27 N
~' 300-0I N
353.78 N
412,99 N
--84,15 E .....
107-75 E
135,8~ E
166,'~4 E ...........
198·64 E
233·~8 E
~78e9~ N ' --ZTOe96 E .......
552.63 N 311.13 E
632e92 N 353·86 E
SINGLE SHOT SURV£'~
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH,
OCT 80
MEASURED
- DEPTH
TRUE
VERTICAL SUB MD-TVD
-'-DEPT~--SE-A-DXFFERENCE ....
VERTICAL
CORRECTION-------TOTAL
COORDINATES--
-3906 ......... '36-69'~ ..... 3600- '- 236
4045 3769. 3700 275
4183 3869. 3800 313
43:20 396"'9,-- -3-qO'O-- --
~57 ~069. ~000 387
~593 4169. 4100 423
'~72 7 ............. ~26x~;- ....... ~200 ~ ' 457
4861 4369. 4300 491
4993 4469. 4400 523
5125
5255 4669. 4600 586
5385 4769. 4.700
..... 38 ..... 716.82
39 801.67
38 885.54
37--' 968.25'
37 10~9.81
36 1129.83
34 --- I207- 63
34 1283.21
32 1357.14
31 I$01.63
29 1372.48
5643 4969. 4900 674
5773 5069. 5000 703
........ 5902 ......... 516q~ .... 5100--733
6033 5269, 5200 763
6163 5369. 5300 794
-- 62q4' ....... 5q69. -5qO0'- - 825
6426 5569. 5500 856
6558 5669. 5600 889
-- 6692 .... 57-69' .... 5700 -' ~22
6825 5869. 5800 956
6959 5969. 5900 989
7092 6069. 6000 I023
7225 6169. 6100 1056
7358 6269. 6200 1088
7~92 6369. 6300 1122
7627 6469, 6400 1158
7764, 6569. 6500 1194
7902 6669, 6600 1233
8044 6769. 6700 1275
8193 6869. 6800 1324
8352 6069. 6900 1382
8526 7069, 7000 1457
29
29
3~
30
31
31
34
33
34
33
32
36
36
39
42
49
58
75
1709,60
1777.73
18'~-7T-
1912082
1980.90
-2050,06
2120.89
2193.11
.... 2267k35-
2341,58
241.5.84
2~88~76
2.561 · 59
2634079
.... 2709- 52
2785.90
286~e 30
.... 294303~'
3026.24
3117,03
..... 3217030
3331059
N --398-.~'7- E'--
N 443,71 E
N 488089 E
1~ ----
N 578,8~ E
N 623089 E
~' -
N 71~-7.~ E
N 761.6Z E
849, 36
893.0S
980.93
1027011
1123,81
1172032
1269,~1
1317,21
1413084 E
1462089 E
15II. 67'-E--- ......
1560,33
1608.11 E
-1696.6~- E
1706,24 E
1757.65
1810.3'6 E
1866.81 E
].930e33 E
2002,~J9 E
2087,34 E
SOHIO ~E;~'L J-i3
INGLE SHOT SURVEY
OCT 8O'
HEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH.
TRUE
MEASURED *VERTICAL SUB" MD~TVD ...... VERTICAL ...........
DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES
8714 7169. 7100 1545 88
8905 7269, 7200 1635 90
9076 7569; ...... 7300--1707 ............ 7Z
9230 7469. 7400 1760
9~76 7569. 7500 1807 47
9662 7769. 7700 1893 41
9801 7869. 7800 1931 38
9937 .... 7969. -~- 7900 -I967
10072 8069. 8000 2002
10207 8169. 8XO0 2037
10342 826qg---8200--2072
10475 8369. 8300 2105 33
10608 8469. 8400 2138 33
10738 '--8569.--°8500 .... 2168 ......... 30
10866 8669. 8600 2197 29
10992 8769. 8700 2223 26
11116 8869, .... 8800-- 2246
11238 8969. 8900 2268 22
11358 9069, 9000 2288 20
I1476 916q. 9100- 2306
11592 9269, 9200 2323 17
11707 9369. 9300 2338 15
3458.68 N 2183.11E
3589.12 N 2280.8] E
3702.23-N- - 2360i66'E ...........
3798.12 N 2427.80 E
~885.42 N 2488e93 E
~971*19 N 2548.9? E
4053.41N 2605.~ E
4132.51N 2659.~1E
4208,XS-N --2711-&90-'E-'-
428~,79 N 2763~7X E
4~7.75 N 2815,01E
· 432.65 N"**-'*286~egOE-~-
4505.15 N 2916,98 E
4574.92 N 2968.30 E
4641,85 R~-3018*.SX E ............
4705.67 N 3067,17 E
4766.49 N 3113,46 E
~.824,75 N ....... 3t57,98- E ..................
4879,97 N 3200,~7 E
4932e44 N 3240-83 E
4982.25 N
5029,2~ N 331~,99 E
5074,05 N 3351,0~ E
$OH ! 0 WEkV~"-_! 3
' SINGLE SHOT SURVE'~'~
OCT 80
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTHe
TRUE
HEASURED VERT ! CAL SUB
DEPTH - -- DEPTH .... SEA
TOTAL
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1000
I000. 930, 0-00
29.50, 2881. 240.28 N 130.45 E
3736- 3667, 774.38 N 429,11 E
~4474g .... 4~04 ~ ............ 1360.8~'F--- ~3~
5243, . 5174,
5999. 5930,
6738'* .....
7322,. 7253,
8015. 7946.
8775-. .... 8706.
1895.62 N 1111.¢6 E
2438,29 N 1477,84 E
3000; 24i- -R*- - ! 848'92 - E- .....
3652.,85 N 2326.08 E
4243-08 N 2736,23 E
HORIZONTAL VIEW
SOHIO ALASKA PETROLEUM
WELL d- I$
RADIUS OF CURVATURE
MAGNETIC SINGLE- SHOT
SCALE I"" IOOO'
OCT. 6, 1980
g'tO0,
TVD = 9450'
TMD& 11,800'
1~,,.~. °E~,T.S s.°W,
ARE TVD- , -
r j-sun
d A Fouch~
President
Mr. Gary Plisga
Sohio Alaska Petroleum Company
3111 C. Street
Anchorage, AK 99503
Oc.tobe~ 7, 1980
Re: Our Boss Gyroscopic Survey
Job No. Boss-16674
Well-J-13 (SEC9 Tll R12E)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: October 6, 1980
Operator: Mike Gary
Dear Mr. Plisga'
Please find enclosed the "Original" and sixteen (16) copies of
our Boss Gyroscopic Multishot Directional Survey on the above
well.
Thank you fog giving us this opportunity to be of service.
KB/kc
Enclosures
Yours very truly
SPERRY-SUN, INC.
Ke/n Broussard
.......... ~-~'~-fSUN WELL S,.,¢VEYING
ANCHORAGE, ALASKA
SOHIO ALASKA
d-j=
., (SEC9 T11N R1BE) ~'6~-b'TATION DATE
PRUBHOF [:AY OCTOBER 7~ 1980
COMPANY
PAGE
DATE OF SURVEY OCTOPER 6,
BOSS GYROSCOPIC SURVEY
,JOB NUMBER BOSS-1667~
K E LL.Y__~_U_S_.U_LN_O__E_L_E V, ,, = 69__,_0_7 F T,
OPERATOR-MIKE GARY
................. T_RUE .................. S.U~.- SE A_ ..... COURSE ........ COURSE
MEASURED VERTIC/~L VERTICAL INCLINATION DIRECTION
DEPTH DEPTH DFPTH DEG MIN DEGREES
O o 6.
SEVERITY
DEG/iOD
T~O .T_AA L_
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERTICAL
SECTION
]00
200
300
4OO
5OO
600
700
800
9OO
1000
1100
t2oo
1300
1 oo
1500
1600
]700
1800
1900
2ooo
2100
7200
2300
2~00
2500
2600 _
2700
2800
2~00
o.oo -gs.o - o o
100.00 30.q3 0 28
199.99 ..... 1%0.o2 ......... 0 .... 58
29g.97 250.90 0 59
399.96 330.~9 0 55
599.94 b30.FI7 0 52
6,99.93 630.g6 0 50
799,92
t~99.q2 830,8b 0 19
999.~1 930.~4 0 21
N O. 0 E 0.00
S 29.39 W
S 25.60
S 24.10 E .02
S 11. 0 E .23
S 25. 0 C . .,30
S 26.19 E ,18
S qS. 0 E .28
S ~5.50 ~'
.~6
S 53.30 E .05
0.00 0,00
· 36 S ,20 W
1.q9 $ ..... ..0__6 W
3.05 S .63 E
4.64 S 1.14 E
7.23 S 2.15 E
R.-,'+4 S . 3.00 E
9.78 S 4.72 E
10.16 S 5.17 E
0.00
-.41
-1.P'~
'2' .~
-3.16
.
'~.70
-5.20
-5.32
-5.38
1099.91 ....... 1_o5p .8 + .s ........ s_3._P .69 w
~199. c! 11~0.R~ 0 ~ N 2~,29 ~
] 299.91 1230.~q 0 19 S 1.10 E
15~° °l 1330.84 0 13 ~ ql.
.... . ............................ o 60 W
lqqg.ql 1430.84 0 19 N 8q.70 W
15qq-~l 1530,8A 0 q2 S 0,10 E
1799.90 17~0,8~ 0 25 S 50,50 E
lSgq.gC 1R30.85 0 22 S 82,59 E
1999.8R ...... ~3.p,21 ......... 1 23 .........~ 42,79 E
2099.77 2030.70 3 57 N 33.29 E
2199,3~ 2130.27 6 33 N 13.89 E
,2_2~8,.~}.~ ...... ,¢2~?._23 ..... 9 56 N 22,39 E
23q6,27 2327.20 ~'~ 8 N 25,7'9- E
2~92,90 2q23.R3 16 36 N 30.60 E
25¢7,75 ...... 2~_~ ....... 20~1.7 ....... ~_.3.~.,20 E
2680,90 2611,~5 22 19 N 31,60 E
2772,61 2703,5~ 2~ 35 N 32,59 E
2~62,77 .. ~Z~3~_~O .... ~.~__.37 N 51.89 E
2951.0~ 28R1.97 29 25 N 30,89 6
.36
.09
.37
,22
.26
.RO
10.38 S
10.38 S
10.62 S
11.05 S
11.18 S
11.76 S
12.61S
g.38
5.33
5.32
5.19
-5.47
-5.67
q.78 E
~.50 E
/~ · ~+ 7 E
-6,~3
-7,07
-7.79
.2q
.53
1.22
2.58
3.11
3.59
3.27
3.68
3.68
2.05
2.29
2.06
2.83
13.15 S
13.~8 S
12.63 S
8.85 S
· q4 S
13.08 N
31.50 N
53.85 N
80.99 N
112.00 N
1~5.71 N
1R2.26 N
222.37 N
q.61 E
5.11 E
6.26 E
8.98 E
12.2q E
16.°0 E
25.1A E
37.37 E
53.63
72,57 E
95.73 E
116.7~ F
lql.2q E
-6.78
-2.12
6,65
20.~0
qO.06
65.5q
97.11
133.38
173.13
216.30
263.I9
................................. AP~'R~YJSU'N-WEL-[-N..,~VF~YING COMPANY
ANCHORAGE, ALASKA
SOHIO ALASKA PFTROLEUM COMPANY
d-l$ '¢sEcg--TllN R]3E) ......................................... ~b~FCtJYATION DATE
PRUDHOE 6~Y OCTOBER 7~ 1980
ALASKA
TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL
DATE OF SURVEY OCTODER
JOB NUMBER BOSS-16674
KELLY BUSHING ELEV. :
6, 1980
69,07 FT.
DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST
~[RTIC~L
SECTION
~200 3123.06 $053,99 31 46 N $1.70 E 1,04 $09,27 N
3~00 3207 30 3138 23 ~3 24 N 31 50 E 1.64 ~55.15 N
S4'~0' ' 328~.33 3220;~ ....... $6 21 N'-$~.10 E 3.06 ~0~.2'8 N
3500 3368.76 3299.6~ 38 26 N 29.79 E 2.09 ~56.90 N
3600 3a45,a9 $376,82 ~0 35 N 29,89 F 2,22 512,55 N
5700 3520,73 3~51,~6 ~2 29 N 29, 0 E 1.90 570,37 N
3800 3593,~2 3524.75 4Z 34 N 28.79 E 1,10 630,11 N .
19~,62 E 565.00
222.8~ E
252.09 E
282,~1 E 536,30
313,58 E 599.62
345.67 E 665.57
37~.65 E 733.43
3900 3666,06 3596.99 43 54
4000 3738,32 3664.$1 ~3 27
'4100 3810.94 3741.47 43 31
4200 3883.62 3814.55 43 14
400 q030.97 3961.
500 q105.21 a036.
700 4254.35 4185.
PO0 4329,56 q260.
0oo ~81.15 ~1~.
90 ~2 12
14 ql 5~
61 ......... 41'~--q~9
28 ~1 32
~9 qO 5~
08 40 28
~00 4557.3~ ~88.27 ~0
300 4710.92 4641.85 39 26 N 32
qO0 4788.30 ~71o.23 39 9 N 33
500 ..... 4~65.°3 479~'.86 ...... 36 0 N 3q
600 Agq3,77 q~74.70 38 45 N 3~
700 5021,68 q952,61 58 53 N 3~
PO0 5099.27 5030,20 39 20 N 35
900 5176.~ 5107.37 39 37 N 35
N 28.50 E .39 690,79 N
N 28.70 E .48 75i.~3 N
N 28. 0 E .49 811.99 N
N 28.60 E .50 872.~7 N
N 29.89 E 1.25 95T~74 N
N 29,79 E ,16 ggO,lO N
N 30.29 E .45 1048.09 N
N 30, 0 E .~2 110'5-~'~]~-i~'
N 50.50 E .43 it63.25 N
N 31.89 E 1.12 1219.63 N
N 30'.-~-g E ,68 12~'~'-~ N
N 32, 0 E ,77 1550,95 N
N 32. 9 E .22 i385.8~ N
~11.80 E 802.17
444.86 E 870.81
477.54 E 939.18
510,10 E lO07.ql
~4~.-79--E
576,78 E 1142,03
610.32 E 1208.7~
677.55 E 1341.59
711.49 E 1407.35
779,50 E 1537.
813,87 E 1602.25
.40 E
· 0
.20
,qO
.90
......... 8'~'~'. 20 "' E ........... 16~g-i~SP-
882,47 E 1730.24
916.78 E 1793.54
951.67 E
987.04 E 1919.33
1022,68 E 1982,02
1058.82 E 2045.1f
· 0
E .40 1494.04
E .38 1547.28
E ,77'' ' 1~49"i79
E ,29 1651.65
E ,3~ 1703,21
E ,46 1754.93
· 7O E
· 50 E
· 53 1806,80
· 13 1858,66
.79 E
19 1095,62 E 2108,70
N 1132.75 E 2172.48
N ' 1169.'9-~ ..... E .....
SOHIO_ ALASKA. pETROLEUF~.
J-13 (SEC9 Ti1N R1
PRUDHOE PX~Y
ALASK~
MEASURED VE.
DEPTH
COMPANY
SPERRY-SUN WFLL . /,VEYING COMPANY
ANCHORAGE, ALASKA
c-O~-PU~'A T 16DI D A T E
OCTOBER 7, 1980
PAGF ,;
·
OA_T.~_OF SU.R.V_E_Y__.OC. TOBEF._. 6,,1, _I980_
,BOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-16674
_K. E LLY__EU_S ~]1N_G_E LE_V_, =__6_?_. 0 ?_ F T.
OPERATOR-MIKE GARY
.T R U [ _SJJ B - S E' A .....
RTICAL- ..... VERTICAL INC
EPTt~ DEPTH D
~.COURSE .........
LINATION BI
[G MIN D
OUR SE
RECTION SEVERITY
EGREE? DES/lO0
T OLA_ k_
RECTANGULAR COORDINATES VERTICAL
NORTH/SOUTH EAST/WEST SECT ION
6200
6300
6400
6500
6600
6700
6~00
6900
7000
7100
7200
7300
7400
7500
5484,29 5~
55~0,75 5~
5636.52 55
5712.02 5642.95
57~7.12 5718.05
5~62.00 5792.95
5936.83 5867.76
6011.~8.6~ 5942.7~ .........
6087.17 6018.10
6162.60 6093,53
6238.12 6169.11
6313.61 6244.54
~388.37 6319.30
!
760
770
7~0
790
7~5
800
P, 05
HiO
815
0 6462,25 6343,18 42 43 N
0 6535.36 6466,29 43 19 N
0 6607.80 6538.73 43 49 N
0 6679,86 6610.79 ~3 58 DJ
0 ¢,715.90 6646.~,5 43 A7 N
0 6751.8~ 6682.77 q~ 17 N
0 6787.40 6718.33 45 I N
0 ...... 682~;4'0- 6753,33 "'--46 ...... 7 N
0 6856,57 6787,50 ~7 3~ N
35.40 E
35.29 E
35. 0 E
35.50 F
34.59 !
34, 9 E
34.79 E
35:..2.9
34.90 E
35. 0 E
35. 9 E
34,79
34,29 E
3q,40 E
34,20 E
34 · 5O E
35. ~ E
36, 0
35.79 F
36. 0
36. 9 E
36.29 E
P2OO
~250
8300
8350
~400
8450
86O
6652.2 688;.17 52 38 N 37.59
6082.08
7010.~5
7038.~2
A5OO 7064.79
0 7114,9b
6913.01
6941.7P
6969.35
6995.72
7045.~8
.39 1962.44 N 1207.12 E 2300.15
.28 2014.59 N 1244.11 E 2364.08
__1,08 2067,35_._N ........ 1.2A$,~! .... E ........
· 23 2120.87 N 1318.45 E 2493.
· 44 2174.42 N 1356,30 F 2559,36
_~7~. . 8~_8~4..._._7~N_ ._ L~.21_E ..... 2625,38
· 33 2283.20 N 1431.61 E 2691.66
.47 2337.89 N 1469.13 E 2757.99
· 51 2392.01 N 1~0J~_1~~~824.10
.28
.15
.12
.87
.72
.61
.55
1.29
1.02
1.fig
2.22
3.03
3.93
24A5.84 N 1544.g3 E 2889.89
2A99,65 N 1582.54 E 2955.54
2553.~ ~ ~ __16~09~ 5 F ~0_21_.02
2607.07 N 1657.76 E 3086.67
2661,77 N 1695.41E 3153.0A
27]7,40 N 1753.44 E 3~0.46
3.47
2.~3
5A .... } ..... N 36.79 .E~ __~.].8 ............ 3.~55~.2p_~_____
55 40 N 35,90 E 3.56 3188.13 N
57 24 N 36.29 E 3.50 3221.83 N
58 55 N 36.40 E 3.04 3256.04 N
60 51 N 35.70 C 2,03 3325.97 N
2773.77 N ]771.A9 E 3288.6g
2830.68 N 1810.78 E 3357.62
2887.61 N 1850,35 E 3426.96_
2915,81 N 1870,51 5 3461.~
2943.97 N 1890,89 E 3496,
2972.~ N 1911.49 E 3531.51
3001,31 N 1932.51 E 3567.20
3030.76 N 1954.06 E 3603.69
3060.95 N 1976.32 F 3641.19
30ql.88 N 1999.34 E 3679.73
3123.25 N 2023.15 E 3719.08
~93_7__.__~_0___E. 3_75 9 . 16
2071.63 E 3800.03
2096.21 E 3841.73
2121.38 E 3g84.19
2172.28 F 3970.67
SOHIO ALAFKA PETROLEUM COMPANY
J-13 (SEC? TliN'Ri~E) ......
PRUDHOE bAY
ALASKA
$1SEpRY-SUN WFLL-'SUPVEYING COMPANY
ANCHORAGE, ALASKA
COMPUT A T I o K'-[TA'T E
OCTOBER 7, 1980
-'-PAOE. '4
DATE OF SURVEY OCTOBER 6, ]980
--F~O~S' 'CYR'OSCO~IC-'SURV~¥
JOR NUMBER ROSS-16674
KELLY RUSHING ELEV, : 69,07 FT,
'O-F~ ¢, R~A'Y 0 D-zHT~-'~-~-R Y
F~E A'SU
DEPTH
RED
TRUE SUB-SEA COURSF
V~RTICAL ..... VERTICAL ..... INCLINATION
DEPTH DEPTH DE'G
COURSE
I RE C'i' I ON
DEGREES
DOG-LE'G TOTSL
DEG/iO0 NORTH/SOUTH
OP,-D'I N A~F E'S-~V F DT I C A L
EAST/WEST SECTION
8800 7214,10 7145.0~
8900 7265,68 7196.61
H950 7292. HH .... :7225, al
9000 7321 · 87 7252,80
9050 7352 · 36 72 A3 · 2r;
9150 7418.1~ 13Ag. OF,
9200 7A52,35 7~3,28
~00 75P9,89 7520,R2
9500 7659.25 7590,18
9600 772~,21 7C60,1A
9700 7~01.25 77¢2.1R
gRO0 787q.95 7805.88
9900 79~8,8~ 78~¢,7~
~0000 8022,88 7953.81
lOlO0 8097, O~ RO2?.m4
10200 .... 817~,I1- 8102,04
10300 H245,19 8176.12
iOA O0 8319.59 8250,52
10500 P3
10~00
10700 P5
~oHoo .....~¢62~.¢D ....... ~5~-,~ ......... 59 ....... ~ N
10~00 8700.99 8631,92 37 0
~000 ......eT~t.G7 H7~2.60
11200 ~g46.GA 8877.57 33 15 N
11300 9030,88 8961,81 31 5A N
66-'-2~ ..... ~736, 0 E
59 33 N 36,40 E
5~ 20 N 36.20 E
55 ...... A'3 ..... ~-~gi-7"~ E
53 24 N 36.20 E
51 26 hi 36.59 E
A.'5~ ..... 7315.~ ...... ~F~-'-28 ...... ~' 37.59 F
47 1 N 37.59 E
46 37 N 37.A0 E
4~ 42 N 36.59 E
q6 10 N 38.20 [
~5 59 N 36.70 E
A2 36 N 36.40 E
42 25 N 36.59 E
~2 13 N 36.29
42 5 N 36,59
~2 ...... i6 ....... N-3~;V6
~2 7 N 37.29
41 43 N 37.29
· 57 3396.59 N
· 86 3466.45 N
1.23 3535.~9 N
5.3fl 3569.20 N
4.74 3G01.94 N
3.97 3633.83 N
6.11 3664,36 N
2,90 3693.69 N..
· 87 3722,6! N
1.27 3R38,26 N
1.10 3895.A4 N
2223,31 E
227q,A3 E Aiqq,32
2325,1~
--23~0.09 E 4P-71,8~
237~.32 E ~312,60
2397.83 [ 4352,20
2'~'O.~i'"E A390.Ab
2443.A9 E A427.~2
2465.69 E 4463,R4
2553.~6 F 4608,ql
2597.26 E h6RO.87
26-E3'~F.~l E ~752,2~
2680,76 E ~821,62
2720,97 E ~8~9.17
2801,17 E 5023,72
.83
1.05
2.60 4008.80 N · 23 4063.13 N
· 1-'~----'~-i'i-T71 ~--N
· 27 4171,23 N
· 25 ~225.22 N 2841.05 E 5090.R1
.28 --~ 2 ~-T. 0-2- N'----iFE~-i-;~'3--E51-5 ?. ~-
· 31 4332.60 N 2921.75 E 5225.b.,
· 40 ~385,7~ N 2962.23 E 5291,R0
~90,29 N 30~3,76 E 5~2~.1~
4540.°6 N 308A.72 E 5~89.19
~ o";"¢ 9 E
43,70 E
43.20 E
43. 9
42.59
~1,50
1.57
2.73
1.61
q6L55.49 N 5166.98 E 5613.
q678.37 N 3207.61 E 5672.
N 40.79
.92
1.28
1.4~
4720.17 N 3246.R0 E 5728.
4761.03 N 3284.70 E 5784.
~801.02 N 3320,79 E 5837.
1.06 4840.29 N" 3'~)5.12 E 5~-~-9.
90
10
5~
SOHIO /~L/.,'~-kA PETPr)I_EU'~
d-13 (SE(_'' TllN Rl.~E)
PRU[;HOE {',AY
ALASKA
C 0 M P A N Y
TRUE SUP-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DFPTH
11500 9202:2~' 9l.',3.22
11600 9288.9.5 o219.~tR
] 1 ZOO .q376,31 9307.24
iiRO0 9q64,15 9595.08
HORIZONTAL DISPLACEMENT =
THE CALCULATION PROCEDURES ARF
SPEqRY-SUN WELL SURVEYING COMPANY
ANCF!ORAGE, ALASKA
COMPU~TATION DATE
OCTOBER 79 1980
PAGE
D.A_T.F.._ _0 F __S U R V E X_ 0 C~ LO [I_E.R~__6.,__ 1 9 ~ 0
BOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-1667A
KELLY._.E~U_$~I.NG_EL[V_~ : 6~_, 07_ ET ·
OPERATOR-MIKE G&RY
COURSE COUR%E DO~-LEG
INCLINATION DIRFCTION SEVERITY PECTANGULAR COORDINATES VERTICAL
DE6 MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
2°. 40 N AO,20 F ,53 4917,03 N 3~20,43 E 59R9,69
28 32 N 3q.40_ [ 1..,.lg__~OEq,qO._N ........ 3_~5~_~7 E 6038,~
28 32 N 39,40 E 0,00 4991,33 N 3481,91 E 60$5,~
60 .P, 5 · 81 F E E T A_T._ DJ Q_R T~H_t.._=3 ,4 _0~ .F__G_, 5_3._~N.._E A S.T_ A_ T_M~ D_~= 1.1_8._Q_O_.
BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
SOHIO ALA,' KA PETROLFUM COM~
d-IS (St-C9 TllN R13E)
PRUDHOE t AY
ALASKA
SPERRY-~SUN W['LL
ADtCHO P
COMPU 1
OCTOFL'
bURVEYING COHPANY
PAGE:
,~ ~ ^ SKA
ATE
1980
DATE OF SURVEY OCTOPER 6, 1'~80
JOB NUMBER BOSS-16674
KELLY BUSHING ELEV,
OPERATOR-MIKE GARY
= 69,07 FT,
INTERPOLATED VALUES FOR KVEN 1000 FEET OF MEASURED
DEPTH
TRUE SUB-SEA TOTAL
MEASURED VFRTICAL VERTICAL RECTANGULAR COOF~DINAT
DE P T H D E~ T H ....... ~ ~"P-T H ...... N'~DP T H / S 6U 1-'H ..... i[ A S T/WE
ES MD-TVD
ST DIFFERENCE
VERTICAL
CORRECTION
o o.oo -(,,q.o7 o.oo
1-000 .... 6-~9- 9i .........-"~ 30'. 84 ............10.16
POOD ~v99.a8 193o.~1 ~.G~ s
3000 2951.0A 2~G1.97 222,~7 N
5000 AASl.15 A412.08 l~O.g5
6nO0 525~.46 51SA.~9 1 ~58.66
7000 6011.B6 5942.79 2392.01
~000 67St.H4 6682.77 294~.97 N
9000 '~21., .H7 7252.80 ~601.9a N
11000 H781,67 8712,60 ~678,37
llPO0 9464.15 93~5.0F~ q991.33 N
0.00 0.00
5.17 E .On .Og
6,26 E .12 .03
141,24 E 48.96 fiR.R4
444.86
779,50
1132,75
F 261,6P 212,66
E 518,85 .257,23
E 746,5~ 227,69
1507.10
1890,89
2374.32
2801.17
5207.61
3q81.91
E 989.1~ 2~1.59
E 1248.16 260.03
E 1678.13 429.97
E '~77.1~ ---~-9"~,~
E 2218.33 241.21
E 23s5.A5 117.5~
THE CALCULATION F'ROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
SPEP RY-~'UN
SOHIO ALASKA P[ IROLEUM CO~'PA~I-
J-13 (SECu T11N R13E)
PRUOHO[ bAY
ALASKA
INTERPOLATFD VALUES FOR
&NCHORAGE, ALASKA
C 0 ~ P U :l' & T'-I ~-N-'B/{~?~
OCTOBER 7, I 9RO
JOB NUMBER BOSS-16674
KELLy BUSHING .~LE.V, = 69~,07 FT.
OPERATOR-MIKE GARY
EVEN_~IOO_FEET OF ~uAr_~EA_O_EP_TU
TRU
MEASURED VERTI
['CPTH ~ DEPT
0 O.
69 69.
169 169,
469
......... b69 569.
66~ 669.
769 769.
869 869.
969 969,
1069 1069,
1160 1169,
126q 1269 ·
1~69
1469 1A69.
1569 1569.
1669 1669,
..... 1769 _~ 1769.
E SUB-SEA
CAL VERTICAL
H DEFTH
TOTAl_
RECTANGULAR ~ _C~OORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD
DIFFERENCE
V E R T .I C_A_.L
CORRECTION
O0 -69.07
O7 0.00
07 100.00
07 200.00
07 300,00
07 400.00
OZ .........500.00
07 600.00
07 700,00
07 POO.O0
07 900,00
07 1000.00
07 1100,00
07 1200.00
07 1300.00
07 1400.00
07 1~,00,00
07 1600,00
07 1700.00
0,00 0,00
.lq S .08 W
1.01 F .27 W
......... 2.57 S ............
A.15 $ 1,0~ E
5.65 S 1.39 E
........... 6,.81 S ................. 1.,~4 E
~.12 g 2.68 E
~,08 S 3,71 F
9.65 ~ 4.59 E
10.05 S 5.02 E
10.56 ~ ~ 5.~0 E
O,O0
.00
,01
_,3_~ ....
,0~
,05
.0_6
.07
,Oa
,0~
,09
.00
.01
__01
,01
,01
,3.!
,01
,01
.01
.00
,00
lO.A5 S 5.31 E
10.96 S 5.27 E
11.38 S 4,50 E
12,~6 S q,q9 E
.... 12.97 S .......... 4.51 E
.09
.09
,0'~
.10
.10
.00
.00
.00
,_0.0
,00
.01
,00
SO~IIO
PRUDHOF [,AY
ALASKA
$ L L'_,K A PFTP OL[L'PI
Ti1N Ri3~ )
INTERPOLATED
SPFF,,'RY-$UN WLLt.' ~.,-F~-F'~-'~G
~ N C H r~' "', '~-; K A
~OMPU t ~ ~ ~. ~.,i uA I E
OCTOBER 7, I980
COMPANY
PAGE'
DATE CURVFY OCTOBER 6, 1980
JOB NUMBER BOSS-1667~
KELLY BUSHING FLEV, : 69,07
OPERATOR-MIKE GARY
VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MFASURED VERTICAL VERTICAL
D~PTH DE~ .............. ~EPTH
1Boq 1B69 07 1~00 O0
196~ 1969.07 1900.00
20 .07 2000.00
P1Gg.07 00.00
2270 226~';0'~ ...... 2200.00
2572 2569.07 2500.00
24~$ 2469~0~ .......
_
2560 2569.07 2500. O0
2687 2~69,07 2600,00
2796 2769,07 2700.00
2907 2~69,07 2~00,00
5020 2~6q. 07 2n00. RO
3136 3069.07 50 O0.00
3254 316~.U7 3100.00
3574 3269.07 3200.00
3500 3369.07 3~00.00
3630 3~69.(37 3400.00
5765 ~569,07 5500,00
TOTAL
RECTANGULAR COORDINATES
NbRTH/SOUTH
MD-TVD
EASI/WEST DIFFERENCE'
VERTICAL
CORRECTION
13.46 S q,91
15.18 S 5,75
10.42 g 7.93 E
3.5A S 11.35 E
8.59~ 15.1~ E
25,79 N 22.53 E
A7.~8 N 33.92 E
75.20 ~' 50.13 E
107,~6 N 70.02 E
~A.3A N 92.8~ F
fB~.98'N 11H.47 E
231.10 N 146.47 E
281.08 N 177.19 E
3~3';-73'N 209.70 F
591.59 DJ 244.69
A57.11N 28P.53 E
hOg.aa N 367.31 E
693,34 N 413.19 E
.10
.11
.18
1.30
3.06
6.12
11.06
18.14
27.03
51.~3
67.57
.00
.01
.07
.31
.82
1.75
~.06
4,94
7.08
8.89
85.18
105.91
131.33
161.~6
10.96
13.64
15.94
17.61
20.73
25.42
5o~ 13
196.77
235.11
35.31
38.34
SPERRY-SUN WFLL . _dVEYING
L ArJCtlORaG[, ALASKA
SO~tIO ALA,S~,A I-'FTROLFLiI~ COF'~ ANY
d-13 (SEC9 T11N R1 3F_) COY, F.U
PRUDHOF I~AY OCTOPF
COMPANY
JOB NUMBER BOSS-
P/~GE 9
ALASKA
.... .K,. E L LY__ P U_S__H_I._b G._._E_L..E V
OPERATOR-MIKE GARY
: 69.07 FT.
INTERPOLATED VALUES FOR EVEN_iO.O_FEET OF SUB-SEA DEP~_~ ....
MEASURED
DEPTH'~
4180
4316
45R5
4719
~a52
5115
5245
5375
550A
5652
5760
6020
6150
6280
6410
TRUE .~'UP-SFA TOTAL
VERTICAL .... VERTICAL ...BEC~ANGIJLAR~. CQQ~.~NATE£ MD-T.~D
[,EPTH DEPTH NORTlt/$OUTH EAST/WEST DIFFERENCE
576.9.07 37
5HF9.07 3H
.,g69.07
~ 069.0_7 ........... ~_o
A169.07 41
4269.07
4364,07
4569,07
4~69,07 46
4769.07 47
4~64.07
4t) 69.07 49
5069.07
5169.07 51
5269.n7 52
556q.07 53
5469.07 54
5569,07 55
VE.R_T_!CA_L
CORRECTION
00,
00,
00.
Of) .
00.
00.
00.
00.
00.
00.
00.
~0.
00.
[lO.
00.
00.
00.
O0 776.94 N
O0 860,q6 N
fin 941.29 N
OD 1020,04 N
O0 1097.58 N
O0 1174.49 N
O0 124R.71 N
On 1322.20 N
O0 1394.25 N
O0 146~.98 N
O0 1534.14 N
O0 1~01,9[l ~I
OD 1668.A0 N
O0 ]75A,65 hJ
O0 1P01.84 N
O0 1~69.1~ IJ
OD 1936.5P N
O0 200~.~1 N
O0 207~.2l ~
458.82 E
505.55 E
5~P.7~ E
593.96 E
273.21 38.10
310.96 37.76
347.2~ 36.32
382.34 35.0~
A16.69 5~.35
450.59 33.90
%83.2o _._3_~ o
515.05 31.~5
639,10 E
683,97 E
J29.51 E
774,04 E
819.15 E
863.90 E
90[{,25 E
953.10 E
998,5! E
1044,62 E
1092,06 E
1140,25 E
,118R.57 E
1236,83 E
1285.19 E
546.30 31.25
576.70 30.a!
- _ --
606.12 29.~2
634.9~ 28.85
663,37 28.39
691.88 2R.51
721.36 29.48
75l_~.2_0__ .......... 2~SA
781.01 2~.80
~11.18 30.17
8417.?_g ......... 30.72
SISFRRY £UN WELL
/~NCt-IORAGE, AL ASK/~,
SOHIO ALASKA PETROLEUM CONIPANY
d-13 (SEC9 TllN R1 3E)
PPUDHOE PAY
ALASKA
C OM'~ U T-A l'
OCTOBER 7, 1980
COMPANY
PAGE. 10
DATE OF SURVEY OCTOBER 6, 1980
,JOB NUMBER DOSS-1667~+
KELLY BUSHING E'LFV.
OP~FFA-Y O'R-=H-It~F-d A-R Y
= 69.07 FT.
INTERPOLATED VALUES FOR FVFN IO0 FFET OF SUB-SEA DEPTH
TRUE_ F:LJB-SEA TOTAL
MFASURED VE,RTICAL VERTICAL RECTANGULAR COO
DEPTH- E FPTH .............. b~pTt~ ..... NO¢~ITH/SOU'I='t-i ......
RDINATE'$ MD-TVD VERTICAL
F~-T-£~ Y~ D FFFFP,TNC'~ CRDI~ ~ F. CT tON
667.5 576n, 07 570
6809 5H69,07 580
6c) 4 5 5c'69,07 590
707.5 6C, 69,07 600
720H 6169,07 610
7340 6269.07 620
7474. 6369.07 630
7609 ~A69,07 640
0,00 2143.91 N 133~.59 E
0.00 .......... 2~i5.33' N 1385.1~ E
O.O0 2288.38 N 1435,12 E
fi. O0 2361.36 N 1485.~6 E
0.00 2432.90 N 153%,90 E
0.00 2504.2~ k' 158~,.76 E
0.00 2575,13 N 1635.51E
0.00 26A7.40 N 1685.61 E
0.00 2722,60 N 1737,00 E
7746 656a.07 6500.00 2gO0,Oq N 1785,79 E
8024 6769,07 6700 O0 2957.65 N 1900,76 E
~.1~) .... G~6~.07 6F~oo.no 304~.q9 N 1~6~.25 F
8327 69Ag,~'~ ....... 6900,-00 ............ ~i~'~V~'N .... ~56,70 E
8508 7069.07 7(100.00 3261.75 N 2125.60 E
~7~0 71~.07 7]00.00 3~0~.75 N ~22P.51 F
R906 ...... 726~o'0f ........ ?200-,00 ............. 3-5~9';'R3-~ ..... 232~t.3~ E
9076 7369,07 7300,00 3650,10 N 2~10,03 ~
~224 _~46.~.~ ........ ~..0O .... 37~6,67 N 2476.4~ E
873.95 32.06
9AO.3R 33.55
97~.0l 33.6~
1006.91 32.~0
1039,~9 . 32.58
1071.7R 32.29
1104.95 33.17
1140.21 35,26
1177.29 ~7.08
1255,04 39.11
1299,56 44.52
1A39.22 80.36
154~.1t lol.S9
lg~ ?.3o '~Fff9
1707,25 69.95
1755,28 48,03
SOHIO ALr~St<A PLTROLEUM
J-13 (SEC9 T11N R13E)
PRU[)HOE F~/~Y
ALASKA
C 0 M P A N Y
SPEFRY'SUN WELL SURVEYING COf'~PANY
ANCHORAGE, ALASKA
OCTOBER 7, 1980
PAGE'11
,JOB NUMBER B0SS-1667~
K E_L_L Y_..R U ~H_I_N_G_[L~_V_,_~ .-- .... 6.9_,0 7_F T,
OPE. RATOR-MIKE G/~RY
t
........ I.N!ERF'OLATED VALUE
TRUE SUB-SEA TOTAL
M. FASURED _ VERTI_C. AL ..... yF.R. TICAL. ~ . RECTANQ.ULA. R_ ..... C_C)_O_R.D!_NAT.[_$_ M_D_-_'LV__D~ ......
DEPTH DEPTH DEPT~ NORTH/SOUTH EAST/WEST DIFFERENCE
YE.RTICAL__
CORRECTION
a$6° 7~'6r~., . o07 7cOO,fl0
9514 7F 69,07 76U0. O0
9655 7769,07 7700, 00
9792 7~69.07 7H 00. O0
9927 7969,07 7900,00
10062 8069,07 ~000,00
10197 P 169._0.~ ...... 8100.00
10332 2269,07 8200.D0
10466 5369.07 ~300.00
10599 8469.07 B400,O0
10751 r569.07 RbO0.O0
10R59 ~669,07 8600,00
lOqSa H76m,O7 8700, O0
]'liO~ ~'~ F~6~.07 PPO0.O0
11226 r~a69.07 8400.00
1134~ 0069,07 9000,00
11461 '916~,07 9100,00
11577 92~9,07 9200,0P
1_1~91 .... "9569,0 7 9~00,00
3~21 · 2 I__N
3003.60 N 260.,
3984.46 N 2662
.__A_~59,H1N 2717
q1~1,91 N
4~04,~ · 96
.~2Z~_.5~ N ....... 2880.12
~49.78 N 2934.R3
4420.74 N 2989.01
q490.11 N 304Z.61
4556,62 N 3097,40
4617.66 N
520].~8
524~.$6
~294.66
~556.52
3375.68
3~13,12
3~49.07
4671,83 N
4722.90 N
4771.85 DI
4818,~2 N
~86~,20 N
A908,38 N
4451,35 N
· 05 F
· 34 F
· 85 E
· 76 E
2772,16 E
2826,00 E
1845.07 44.20
1R86, TR 41,72
1~_~_6 ........ 3_6.~1~
1958.24 35,29
1993.28
2063.i3 34.95
2097.i8 34.05
2130.58 33.q0
2162,18 31,60
2190,7~ 28,57
2215,~7 24.73
....
22~7,5~ 22,07
2257,75 20,21
2275.g0 1R.15
2292.49 16,59
2308,05 15,56
2322.6~ 14,63
.................... ,~PERRY--~UN WELL SuF,-V'EYIN6
ANCItORAOE, ALASKA
CC)MPUYT~TI o~
OCTOBER 7,
SOHIO ALAgK/~ t'ETROLFI~H COMPANY
d-15 (SEC9 TllK' P1
PRUDHOE dAY
ALASKA
COMPANY
PAGE-12
DATE OF SURVEY OCTOBER 6,
1980 JOB NUMBER BOSS-1GGTA
KELLY BUSHING ELEV. = 69.07
O-~E ~-A-T O-F--M'!
19eo ·
FT,
INTERPOLATED VALUES FOR
EVEN 100
FEET OF SUB-SEA DEPTH
MEASURED
DEPTH
11800
TRUE SUg-SFA
VERTICAL VERTICAL
DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/~OUTH .... EAST/WEST
MD-TVD
O I F F E R E N-c-~'
9464.15 9395,08 4°91.33 N
3481.91 E 2335.85
VERTICAL
C6FRFCY-z ON
13.16
T hE
CALCULATION PROCEDURES USE A LINEAR
THE ~'EARFST 20 FOOT ~F) (FROM R/~DIUS
INTERPOLATION PETWFEN
OF CURV/~TUR[) POINTS
,
' } ~ , I t ' ~ ~ i ~ , ~ I S~~,,~d Date'
~ ' ~ t tI~ ~ i ~ Iii, ., ~, I .... ~ j
-' ....
-.~- ~ ..---~-[ · ' ,, i ~ ~ i ' I ' i ,, , ~ , ' q .....
, ' I i .... ', ~ ' '
. ~
~ ' , ' ~ i I [ ' ----~ ......
,,
Check Form
for timely compliance with our regulations.
Operator, Well Name and Number
Reports and Materials to be received by: //-3-
Date
Completion Report
Well History
Samples
Mud Log
Core Chips
Core Description
Registered Survey Plat
Inclination Survey
Directional Survey
Drill Stem Test Reports
Production Test Reports
Logs Run
Digitized Log Data
Required Date Received
Yes
Yes
Remarks
Yes
CURVE DATA
LOCATED IN
THE
APPENDIX
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
SOHIO--BP ALASKA PRODUCTION DIVISION
ARCO
TO:
EXXON
PHILLIPS
REFERENCE'
SOHIO LIS TAPES
~~The following material is being submitted herewith. Please acknowledge receipt by sig
copy of this letter and returning it to this office:--
MAIL: POUCH 6-612
ANCHORAGI .0, '
,
~ RES ENG,/~
lOllel8~ ~ -~~
4 ENG
~ ~ 1 ~E~
- i 3 ~EO~
~STXY-~
J~TAT ?~
.... I"
CoN-FE~:
J-13 LIS Tape 9/28/80 #1&2
t/61030
Carol Kriet~~'
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265~000
MAIL' POUCH 6-612
ANCHORAGE, ALASKA 99502
October 7, 1980
CONFIDENTIAL
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well J-13 (22-03-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of September, 1980. Al_~.~soe~clo~e~..are__/h~ee
copies of the survey plat showing revised ...... surface location.
~.......__ ~ , , ,. . ,
Yours very truly,
District Drilling Engineer
RHR:ja
Enclosures
cc: Well File 917
Form No' 10-404
REV. 3-1-70
( ~r f SUBMIT IN DUPLICATE (
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. AP! NUMERICAL CODE
50-029-20497
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28281
Sohio Alaska Petroleum Company Prudhoe Bay Unit
3. ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchorage, Alaska 99502 J-13 (22-03-11-13)
4. LOCATION OF WELL
At surface:
1048' SNL, 804' WEL, Sec. 9, TllN, R13E, UPM
10. FIELD AND POOL, OR WILDCAT
Prudhoe Ba¥~ Prudhoe Oil Pool
11 SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 3, TllN, R13E, UPM
12. PERMIT NO.
80-83
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
September, 1980
Spudded well at 1200 hours, September 7, 1980. Drilled 17 1/2" hole to 2686'.
Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2668'. Cemented with 3720
cu.ft. Arcticset II cement. Installed and tested DOPE. Drilled out to 2670',
ran leak-off test to 0.64 psi/ft, gradient. Directionally drilled 12 1/4" hole
to 10786'. Ran open hole logs. Ran 276 jts. 9 5/8" 47# L-80 Buttress casing
to 10780'. Cemented in two stages: First stage with 1535 cu.ft. Class G cement;
second stage through D.V. packer at 2603' with 130 cu.ft. Arcticset I cement
preceded by Arctic Pack. Cleaned out to 10737', tested casing to 3000 psi, okay.
Drilled out to 10810'. Performed formation competency test to 0.7 psi/ft.
gradient.
14. , hereby ce~ th~at~ tr~ue and ~ect
SIGNED %~ %~x.~% ~a ~ TiTLEDistriot Drilling Enginee~ATE LO · ~ ~ ' ~
._ .__ _
NOTE--Report on th~ ~rm is required for each cal~dar month, regardle~ o( the ~atus o~ operations, and mu~ be filed m duplicate with the
oil and gas conservation committ~ by the 15th o~ the succe~ing month,unl~ otherwise dir~t~,
IO I zo ~o 40
5 ..... (Refuel)
,
,(
2O
50"' ~ 40
_
· 005' ~
( Actual )
I0 20
~ 3BI' , '~1 '
2280'
d-13
(Propostd)
(Actual} -- -
d - 12
f(Propotld )
~ -!
' ~~- .... ,.,o.o..)
-~-.~' . ,
Lot. = 70°19'$7.82' ,
~. Lon~148o~O'08 98"
Y= 5~970,605
!1
CERTIFICATE OF SURVEYOR
I hereby cerlify that lam properly registered to
practice land surveying in the S1ate of Alaska and 1hal this plol
represenls o Iocolion survey of lhe wellpod shown and fha wells
thereon. This survey wosmode by me or under my supervision
end oil dimensions end other deloils ore correct, Bollom hole
locations are furnished by others.
Dale Surveyor
NOTE: All bottom holes ore 8800' sub sea.
PAD DETAIL
SCALE' I"= 300'
PORTION
T. II N., R.13 E.
SCALE-I": I/Z MILE
PAD "J" EXTENSION
Located in
REVISED SURFACE LOCATIONS J-Ia, J-Il, J-Il:, J-IS LAB 8/4 /BO
ADDED PROPOSED BOTTOM HOLE J-IS CJR &/lB/BO
REVISED PROPOS£D BOTTOM HOLE: J - I! FROM 680' TOESO' SNL, FROM 50' TO75'W£L PJR
REVISED PROPOSED BOTTOM HOLE J~-12 FROM 780' TO BO0' WEL PJR 1/21/80
· I I L I I II I " I I I
~
NE I/4 P~:) rRA~TtD S&.C_9_~TII~Nj ~,_~ E_j_U_.MIAT MEmO,AN ALASKA
Surveyed for
::SOHIO PETROLEUM COMPANY
_
.,.
Surveyed by
F.M. LINDSEY Bi ASSOC.
LAND 8 HYDROGRAPHIC SURVEYORS
2502 West Northern LIght~ Boulevard ~ox 4-081
Anchorage ' AIosko
i i i i i i i i i ii i i i1
ALASKA OIL AND GAS CONSERVATION COMMISSION
Thru:
Hoyle H. Hamilton /~~
Chairman/Commi s s io ~.
Lonnie C. Smith '/
Commisaioner
Doug Amos ~/~'~~
Petroleum Inspector
October 2, 1980
Witness Retest of wavied
BOPE test on Sohio ' s
J-13 Well, Sec. 9, TllN,
R13E, UM. Permit No.
80-83 on Nabors Rig 18E.
Thursday Sept~r..25,..1980~ After testing the BOPE at Brinker-
hoff Rig I I traveled to Nabors Rig 18E to witness the BOPE
test. The test commenced at 12t30 pm and was concluded at 5530
pm. I filled out an AOGCC BOPE Test Report, it along with a
copy of the operators BOPE report, for the test waived on
September 9, 1980, are attached.
In summary, I witnessed the BOPE test on Sohio's J-13 well on
Nabora Rig 18E. I filled out an AOGCC BOPE teat report, it
along with a copy of the operators BOPE report for the test
waived on September 12, 1980, are attached.
DA=mm
o~s
4/8.0
Inspector
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Da te ",~'PT- "~.5,,,/,.,~,~
Well ..3-/..5
Operator ,,,~O1-¢/¢
Well
Location: Sec ~ T II~
Drilling Contractor
Location, General
Well Sign
General Housekeeping
Reserve pit
Rig 0~"
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Results: Failures
Test Pres sure
'2 5~2o0
Representative
Pe rmlt #
e~Sfaslng Se~ ~ /~~ ~ ft.
~zg # ]~ Re~resentatiw. ~/~-&
ACCUMULATOR SYSTEM
Full Charge Pressure ~(D~ psig
Pressure After Closure /~P~ psig
200 psig Above Precharge Attained: min /~ sec
Full Charge Pressure Attained: ~ min /~sec
N2 2/~5~ ~;1'/5~ '"~l.,,~j ~/~5 psig ~
Controls: Master ~/C
Remote ~P~ Blinds switch cover ~
Kelly and Floor Safety Valves
Upper Kelly. ~/~ Test Pressure
Lower Kelly'B'~ Test Pressure
Ball Type ~f Test Pressure
Inside BOP ~ Test Pressure
Choke Manifold ~ Test Pressure
No. Valves /~
No. flanges
Ad~ ustable Chokes
Hydrauzcally operated choke
/ ~ Test Time ~ hrs .... ~
Repair or Replacement of failed equipment to be made within days and
Inspector/Commission office notzfied.
Dis tribut~on
orig. - AO&GCC
cc - Operator
cc - Supervisor
Inspector
, ('
DATE
c)_/2_--
BP ALASKA INC.
30P EQUIPMENT TEST RER
R~G . , /~'~--
WELL ~-,,L~
TEST FLUID [~1'~'~ !
ACCUMULATOR VOLUME / ~0 ~.~ ]
TEST TYPE: ~WEEKLY ~FLANGE UP
D C~Ne SET ,
LAST CASIN~: ~."AT ~?~ .
PRESSURE ~ PERFORMANCE TESTS~
IMANUFACTURER AND TYPE, SIZE OF RAMS, ETC.
BOP STACK-- LIST ALL ITEMS TOP TO BOTTOM,
· ,
ACCUMULATOR ACCUMULATOR ONLY
TEST TEST 8~ PUMPS. . .
CLOSI NG CLOS I N G RECHARGE
UNIT PRESSURE T I ME TI ME T I ME TI ME
ANNULAR -m..,.~oO ,, /,~'" ,~;~,. .,~.") .5~c ,
BLIND RAM ~0 ~ "
, , ,
PIPE RAM, ,~Oc3 ~" ~ _~,,~ ~ ~C¢ ~,,~r
CHOKE MANIE ~o~ ~~ ~]~e TEST TOOL: ~UG, ~CUP~ ~PACKER~.-~'~,
KELLY COCK ~ I ~~ , .~ ~;~ CASING TESTED: ~,~-~ FT. TO ~o .PSI
KELLY VALVE ~2" ,~0 .~ ~, ACCUMULATOR RECHARGE:,=~.r~ PSI BEFORE TE
' ' ./,~ PSI AFTER CLOSING ALL BO1
INSIDE BOP. '/~[~.l~-~e~ MIN. RECHARGE TIME.
KELLY HOSE ~oO ,~ ,, BOP DRILL SEC.
STAND pIpE ~o0 ~ ,, TRIP DRILL SEC.
. . NITROGEN PRECHARGE: I.
CHOKE LINE ~~o ~ ') ~ ~ 5. 6.~ 7. , 8.
KILL LINE ' ~~ ~ ' 9 .... I0. I1. 12. 15
.... ,, , , , , ,
14 15. ~16
EQ
)UIPMENT CHECKLIST YES] NO
CIRCULATING HEAD ON FLOOR '~
INSIDE BOP ON 'FLOOR 8t SUBS
KELLY VALVES ON FLOOR a SUBS. X
s ^.E V^,VE
PVT SY~TEM OPERATING ~,,~
FLoW'SENsOR oPERATING X
,
STROKE COUNTER OPERATING ,,.'~,~/'.
TRIP TANK
LOCKING SCREWS ON BOP 8~ ALL VALVES
OPERATE EASILY.
REMOTE STATION oPERATING
BOP HANDWHEELS INSTALLED '"
GAS SNIFFER OPERATING
BARITE ON HAND ~,'~ ~ ,, SACKS
GEL ON HAND, 2 ~''~ , SACKS
WATER ON HAND ~b-:~) BBL
SURFACE MUD VOLUME <XgPE~ BBL
HYDRAULIC OIL ON HAND ~.'~' , DRUMS
NITROGEN BACKUP SYS ~ NO. OF
BOTTLES HOOKED UP~ AT
NITROGEN PRESSURE.
MALFUNCTIONS 81 COMMENTS (ITEMIZE ALL LEAKS, MALFUNCTIONS, MISSING EQUIPMENT, ETC., AND
ACTION TAKEN.)
§'P SUPERVISOR:
-~
July 31, 1980
Mr. R. S. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-613
Anchorage, Alaska 99502
Re, Prudhoe Bay Unit J-X:3
Sohio Alaska Petroleum Company,
l)ern.tt Nc). 80-83
Bmr. Loc. l 6S0'SNL, 804'WEL, Sec. 9, Ti. IAq, R.t3E, UPM.
Bottmuhole LQG. s 1710'$#L, 2280'EWL, Sec. 3, 711N, R13E,
UPH.
Dear
Enclosed is the approved application for permit to drill the
above referenced well.
well samples, core chips and a mud log are not required. A
directional lurveYliS required, l£ available, a tape contain-.
ing the d~gitized og information on all logs shall Be sub
hatted £or copying except experJ3nental logs, velocity surveys
and dipmeter surveys.
Many ravers An Alaska and their drainage systems have been
class~£ied as important for the spawning o~ migration of
aaadromous £Aeh. Operations An these areas are subject to AS
X6.50.870 and the regulations promulgated thereunder (Title
Alaska Administrative Code). Prior to commencing operations
yOU may be contacted by the Habitat CooEdinator's office,
Department of Fish and Game.
Pollution of any raters of the State is prohibited by As 46,
Chapter 3, Article 7 and the regulations promulgated thereunde~
(Title 18, Alaska Administrative Code, Chapter 70) and ~y the
Federal Water Pollution Control Act, as amended. Prior to
Nr. R. H. Reiley
Prudhoe Bay Unit J-13
-2-
July 31, 1980
co~encing operations you may be contacted by a representative
of the Department of Environ~ental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska
Department of Labor is being notified of the issuance of this
permit to dril 1.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 'hours after the well is
s~udded. We would also like to be notified so that a repre-
sentative of the cosmission may be present to witness testing
~of blowout preventer equip~ent before surface casing shoe is
drilled.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
wi,~ms p~t~.
Very truly yours,
~Ham i 1 ton
Chairman of BY OROT. a Oa TH: CO~IMISSION
Alaska Oil & Gas Conservation Commission
Enclosure
cc~ Department of Fish & Game, Habitat Section w/o encl.
Department of Rnvironmental Conservation w/o/encl.
Department of Labor~ Supervisor, Labor Law Compliance
Division w/o encl.
SOHIO ALASKA PETROLEUM COMPANY
July 23, 1980
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL. POUCH 6-612
ANCHORAGE, ALASKA 99502
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Attention: Mr. H. H. Hamilton
Gentlemen:
Well J-13 (22-03-11-13)
Enclosed are the following documents, in triplicate, along
with our check for $100.00 to cover the permit filing fee.
1. Application for Permit to Drill;
2. Proposed Drilling Program Outline;
3. Surveyor's Plat shc~ing well location;
4. Blowout Prevention Equipment Diagram;
5. Pad Map showing well course.
Very truly yours,
SOHIO ALASKA PETRO~ CC~4PANY
District Drilling Engineer
Enclosures
cc: Well File #17
('
PROPOSED DRILLING AND CCMPLETION PROGRAM
Wm--.T. J-13 (22-3-11-13)
Dry bucket 36" hole to 80' below ground level and cement 20" x 30"
insulated conductor to surface using 12 cu.yds, concrete.
Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing
to surface using 3720 cu. ft. Arcticset II cement.
Blc~out Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer frcm 13 3/8" casing point to T.D. Maximum possible
bottc~ hole pressure is 4390 psi at 8800' TVDss (based on original reservoir
pressure). Maximum possible surface pressure is 3330 psi based on a gas
column to surface frcm 8600' TVDss and an oil column to 8800' TVD.
Directionally drill 12 1/4" hole to 8585' TVD. Run 9 5/8" 47# L-80 Buttress
casing to 8585' TVD and cement first stage with 1540 cu. ft. cement. Cement
second stage through D.V. packer collar at 2600'+ with 130 cu. ft. Arcticset
I cement. 9 5/8" casing will be hung at surfa, ce~ the 9 5/8" x 13 3/8"
annulus will be Arctic Packed.
Directionally drill 8 1/2" hole to T.D. at 9385' TVD. Cement 7" liner to
500' inside 9 5/8" casing shoe with 310 cu. ft. Class G ~t with 18% salt.
Run 7" tubing with a production packer assembly at 7980'+ TVD. A subsurface safety
valve with dual control lines will be placed at 2100'+. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed
perforations to be submitted on Sundry Notice to follc~.
Form 10-401
REV. 1-1-71
la. TYPE OF WORK
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN T~
(Oth~ msUuct]ono ,,n
reverse s, de)
PERMIT TO DRILL OR DEEPEN
DRILL ~] DEEPEN l--']
b. TYPE OF WELL
WELL WELL OTHER
Z NAME OF OPERATOR
Sohio Alaska Petroleum Company
SINGLE
MULTIPLE
3 ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4 LOCATION OF WELL
Atsurface 650' SNL, 804' WEL, Sec. 9, TllN, R13E, UPM
At proposed ~od zone
1710' SNL, 2280' EWL, Sec. 3, TllN, R13E, UPM
13 DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
] 0 m~ ] P_.~ NW of Deadhorse
14. BOND INFORMATION
TYPE Blanket Surety and/or No. American Insurance Co.
3348616
API #50-029-20497
6 LEASE DESIGNAI~ON AND SERIAL NO
ADL 28281
7 IF INDIAN, ALLOTTEE OR TRIBE NAME
8 uNrr FARM OR LEASE NAME
Prudhoe Bay Unit
9 WELL NO
J-13 (22-03-11-13)
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
11 SEC., T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 3, TllN, R13E, UPM
12.
Amount $500,000.00
15. DISTANCE FROM PROPOSED *
LOCAIION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also to nearest dng, umt, ff any)
1710' south
of ADL 28278
18. DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT
2175' north of Well J-5
16 No OF ACRES IN LEASE
2560
19 PROPOSED DErrtt
l1707'MD 9385'TVD
1 ? NO.ACRES ASSIGNED
TO THIS WELL
160
20 ROTARY OR CABLE TOOLS
:icsetI
21. ELEVATIONS (Show whether DF, RT, CR, etc ) 22 APPROX, DATE WORK WILL START
~-- ~ = 65' AMSL August 20, 1980
23 PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE MDSE~ING DE~V~ Quantity of cement
36" 20"x30" [nsulated Cor~uctor 110' 110' 12 cu.yds. Arcticsetconcrete
17%" 13 3/8" 72~ L-80 2670' 2670' 3720 cu. ft. Arcticset II
12~" 9 5/8" 47# L-80 10562' 8585' 1540 cu. ft. ClassG;130cu.ft. Arcti
R~" 7" 29# L-80 11707' 9385' 310 cu. ft. Class G w/18% salt
See attached proposed drilling program outline.
RECEIVED
JUL B $1,9 0
Alaska 0il & Gas Co,~.
Anchorage
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal Is to deepen g~ve data on present producUve zone and proposed
_. new productive zone. If proposal Is to drill or deepen dtrect~onally, g~ve pertment data on subsurface locations and measured and true
EFt:
ver~cal depths. G~ve blowout preventer program.
'd~
24. I hereby c~ean District
SIGNED.~ DATE 7 '- ~ ~ ~'-~ ~ TrrLE Drilling Engineer
Ri H- ~-~- ~- -~'I ' - -
~DITIONS OF APPROVAL, IF ANY
~P.I. NUMERICAL CODE
(This space for State office use)
SAMPLES AND CORE CHIPS REQUIRED MUD LOG OTHER REQUIREMENTS
[ D ES
DIRECTIONAL SURVEY REQUIRED
[] NO
PERMrr N O ~
O. ~ ~ APPROVAL DATE
C§,V, SSiON*s.. o. R...,,. S d.
DATE
07/31/80
02
20
30
d-8
-- (Actual)
(Pro~oted)
J-9
Actual
20 :50 40
o____~ J-? -~t
(Actual ~
3005' v
d - 6 (Actual)
d -12 .~_~.
( Propoled ) (~
_ ,
--
- ' , ,, 104'
d-6
Lat = 70°19'$7 82"
Long. = 148050'08 96"
9 X= 64:5,547 _
Y: 5,970,605
16 t
I0 20
2280'
--
i j_ I$
( PrOpOlad )
~ (Propo.ad)
PAD DETAIL
SCALE I"= 300'
PORTION
T. II N., R.13 E.
15 i SCALE I"= I/2 MILE
CERTIFICATE OF SURVEYOR
! hereby certify that lam properly registered to
practice land surveymg in the State of Alaska and that this plot
represents o location survey of the wellpad shown and the wel~
thereon. This survey was made by me or under my supervisJor~.L
and all dimensions and other details are correct. Bottom hole
locations are furnished by others. JUL
Date
NOTE
All bottom holes are 8800' sub sea
PAD "J" EXTENSION
Located ~n
NE I/4 PROTRACTED SEC 9 UMIAT MERIDIAN
Surveyed for
SOHIO PETROLEUM COMPANY
Surveyed by
F.M. LINDSEY 6 ASSOC.
ADDED PROPOSED BOTTOM HOLE J-l:5 CJR 6/iB/BO LAND 6 HYDROGRAPHIC SURVEYORS
REVISED PROPOSED BOTTOM HOLE J-Il FROM 680' TO650'SNL, FROMSO' TO75'WEL PJR 1/51 2502 West Northern L~ght$ Boulevard Box 4~081
REVISED PROPOSED BOTTOM HOLE J-IA FROM 780' TO 800' WEL PJR 1/21/80 Anchoroge Aloska
B.O. F,'-"~S TA C K
CONFIGUF~TION
13 5/8" TRIPLE RAM STACK
5000 PS1 WP
DRILLING
ANNULAR
PREVENTER
Z" KILL LINE
CHECK GATE GATE
J I
I
PIPE RAMS
I I
BLIND RAMS
DRILLING
SPOOL
CHOKE LINE
l__ .
GATE HYDR. ASST.
GATE
.1
PIPE RAMS
1
TVD 4756
4684
TVD 4615
TVD4545
TVD44?q
,4285
4:~15
/
TVD 4054
~ TVD 4608
TVD 474i
~ T VD 4676
)TVD4610 i
~TVD 4545
I
)TVD 428~
TVD 4191
I
~TVD 42151
I
TVD 411 TVD 414~
I
I
TV05987 J
TV0394~
+ +
58:'5 TVD $858
TVD 377~.
:5738
TVD T¥D 3781] 1
~1~05660
TVD
~VD 3"4~T~ 329,
TVD 3~6~T~ 3200+
~d-7
TVD 4084
~~TVD4004
TVO 3959~
'~..D ~9Z2
TVD ~871 ~V~ 56~8
+ TVD 3780'~
TVO 3687~T~D$66~
TVD 3592
TVO$592~b.~Z~,572
450'
lO0'
$50'
· CHECK LIST FOR NBW WELL PERMITS
Item Approve Date
(1) Fee ~/~J~- ?-~L~-f0 1.
2.
3.
(2) Loc. ~/~ Q-%~0 4.
/~ ~ 5.
(3) kgmin ~~
Lease &Well No.
Remarks
O~mpany
Yes No
Is the permit fee attached ......................................... ~-
Is well to be located in a defined pool ............................ .~/~ __
Is a registered survey plat attached .............................. -/~-~
well located proper distance frcm property line ................. :~
Is
Is well located proper distance frcm other wells .................... /~.
undedicated acreage available in this pool ............
6.
Is
sufficient
7. Is well to be deviated ..............................................
8. Is operator the only affected party .................................
9. Can permit be approved before ten-day wait .......................... ~ __
10. Does operator have a bond ~ force ..................................
11. Is a conservation order needed ......................................
12. Is administrative approval needed ...................................
13. Is conductor string provided ........................................
14. Is enough cement used to circulate on conductor and surface ........
15. Will cement tie in surface and intermediate or production strings ..~
16. Will cement cover all known productive horizons ....................
17. Will surface casing protect fresh water zones .......................
Will all casing give adequate safety in collapse, tension and burst.~
18.
have sufficient pressure rating - Test to _~2~2o psig
19.
Does
BOPE
J -13
Approval Reccmmended:
Additional Requirements: ~~ ~/d~/~g///~//, .~ ~-~f-/~ / J~3 ~ Co'Is,,,-/
Geology: Enginee.rin9:
HWK LCSd~ BEW <~
JAL
rev: 03/05/80
Well Histo~ File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Company SOHIO
LIBRARY TAPE
CURVE SPECIFICATIONS
PETROLEUM COMPANY
Well J-13
Field PRUDHOE BAY
County, State N. SLOPE, ALASKA
Date 12-21-81
Curve Name
(Abbrev.) Standard Curve Name
Logs Used
GR1
CCL1
LSN1
SSN1
Gamma Ray
Casi~.g Collar.Locator
Long ppaced
Short Spaced
Compensated Neutron
CN1
GR2 t' Gamma Ray
CCL2 I Qasing Collar Locator
LSN2 . Long Spaced
SSN2 Short Spaced
Compensated Neutron
CN-Mult ispaced
GR3 Gamma Ray
CCL3 Casing Collar Locator
LSN3
Long Spaced
SSN3 Short Spaced
CN3 Compensated Neutron
Scale
0-100, 100-200
0-10
0-1250
0-I000
60-0
0-100, 100-200
0-10
0-1250
0-1000
60-0
0-100, 100-200
0-!0
0-1250
0-1000
6O-O
S__/3HTO AL~,.c:;_K.&. PETRfll F_II~
3-1_3
1-5 £~RVER ~ ...............
DR[ CN! CCL~_ ~ St,Il ~_ fit~p CN2 £C~ 2 LSN~ S.C;l~!:p r.F~X £N3 CE! 3 L.RN3 R.e-,N3
~OP1 108flO.Q~.J--3-O-11715:O0
~-~AF!PLES pFR RECORD
PAGE
OH-!O-A~A~ETROLE!!~
~!~
--~EPTH _GR! CC~.! CN! ~Sr,!!
~T ....... API ·
AP!
~.___73 ~. 5 0,80 5!=0 96!:~ ~07 ~- 5 78 = ~-~.0 :-~ .... ~: 0 ~,~+9~=9 !87=!
10R22 0 90 q
10~2~ 0 88 2 0 i~ ~!9 8 Pll ?
..,o 87~s 0.80 56~! ~-gq.n ~x~j ~~o.R n.o ~.~
LO~28~Q ~9,0 0.80 5~,0 18q~ ~~ ~7 ~R d~O 97,0
~,0 8~ O~8n ~4 P02.~ ~09.7 87.~ O~R O.O 105.5
PAGE 2
DH_IXI~.6LA~KA PETROLFII'~
~[]F_P__I_H_ GR! CCL! CN~ m .SN1 RP-,N1 GR..'?_ CCL~ CN:~ LSN:) .~N2
_~ FT .... AP_T ~ ~P_I .~
PAGE
~.Q ~AL~S K A
-!3
__~_._T._~__._. OR1 ££L1 CN1 I SN!. S~N1 GR2 _CCL.2.. CN2 LSN2 ~SN2
FT' ..... /~J~_I ~. A P ]' ~
10922 0
PAGE
DEPTH GR! Cci ! CN1 IS_N1 SSN1 GR2 CCL2 CN2 LSN~ SSN2
_ _IrT a,P! ~ AP_T ~
PAGE
QH.[O'ALASKA P~TNOLFIJM
__ DEPTH GR1 C£L! CN! I SN! ggN~ GR2 ~£L2_ CN2 LSN2 ~SN~
__ FT____APT ~ ........ AP~_ ~
110.O_Q..,_Q_ ...... D1._.q n_.sn g_-7 I n_l.p=P _ c~1.9_.5 76-_7
~. NIJ!V~RE.R ___ I 18'7._ on
PAGE
O-H!O ALASKA PFTROLFUM
~T _ ~PT ~ APT
0 85 7
PAGE
OHIO 'ALAgK4 PETROLE~
PAGE .5.
__D_EP_T H GR3 C C L.'5
CN3 I SN~
PAGE q,
OI=LID-~_~4J_A~ A
__ DEPTH GR3 Cci
___F_T _._APT_ ~ APl'_
PAGE
~__E.T_ ....... ~ P T ~ A P 1'
CONHBDffiAL
LVP 010,H02 VERZFICATXON bISTZNG P'AGB I
** RBg~ HBADER
DATE Ig4/09/
ORIGIN ;
REEL NAME {
CONTINUATION
PREVIOUS REEL
COMMENTS :
~* TAPE HEADER *e
SERVICE NAME IED~T
DATE 84/09/ 2
ORIGI~ 10000
TAPE NAME 19410
CONTINUATION # $01
PREVIOUS TAPE ~
COMMENTS I
EOF
** FTbE HEADER
FILE NAME IED~T ,001
SERVICE NAME
VERSION #
DATE ~
~AXIMUM I,ENGT~ [ 1024
FILE TYPE
PR~V)OUS riLE
** INFORMATION RECORDS **
MNEM CONTENTS
CN { SOHXO A6A~A PETROLEUM COMPANY
FN { PRUDHOE BAY
RANG{
TOWN{ I~N
SECT! 9
COLIN{ N.SbOPE
STAT{ ALASKA
CTR¥! USA
~m ~ ~m~ m~ ~m~
000 000 030 O65
ooo
O0 000 0 065
000 000 004 065
000 000 004 065
000 000 00:~2 065
000 000 008 065
~00 0~0 0:06 065
O0 0 0 003 065
V
bVP OI0,H02 VERIFICATION LISTING PAGE 2
SCHLUMBERGER ~
ALASKA COMPUTING CENTER
COMPANY ~ &OHIO ALASKA PE?RObEU~ COMPANY
rI£bO = PRUDHOE BAY
COUNTY = NORTH SLOPE BOROUGH
STATE = ALASKA
dOB ~UMBER AT ACCI 6941,0
RUN #2'HDATEH~ hOG,EOf 13..JUL-1~4
LDP ~
CAS/NG ~ 13.375" SURFACE TO ~6 0[
CASING 9.625" SURFACB ?0 ! ?_:0
CASING - 7.000" SURFACE TO 10269
TYPE FLUID · CRUDE OZb
FLUID bEVEl, = FLOWING
*********************************************************************************
· L~ I'I[, I l -I1 e I;.] iii_: [;.] i~ V
bVP 0t0,H02 VERIFZCA?~ON bZS?ZNG PAGE 3
~NTRY BbOCK$
TYPE SIZE
2
4
8 4
9 4
0
REPR CODE £NTR¥
66 1
73 60
65
o~,, ~. ooooo oo o o , ,'6, ooo.oooo.ooo
ZER GAPI O0 310 O1 0 0 4 1 68 00000000000000
oooooooooooooo
F,SIG PS! CU O0 400
?RAT PSi O0 420
GR PSI GAP1 O0 310
BACK PS! CPS 00 390
FBAC PSi CPS O0 39~
NTD~ PS 1 CPS O0 390
~TDT PSi CPS O0 391
SIGH P32 CU O0 400
FSZG PS2 ~U O0 400
TRAT P&2 00 420
~R PS2 GAP1 O0 310
BACK P&2 ePS O0 390
FBAC P&2 CPS O0 391
"TOT PS2 CPS 00 390
30
P&5 cPGAPI O0 3109
BACK P~5 CP&S O0
00
oi o
0
o°I o
t? 0
o0 0
O0
0
o o
ol o
0
oOO o
0
o~ °o
O1
Ol
Ol 0
O0
O!
ol
Ol 0
Oi 0
0
0
o
0
0
0
0
oo :.
0
0
O0 ?
0
0
0
0
0
4
4
4
4
4
4
i 68 00000000000000
68 00000000000000
68 00000000000000
~ 6800000000000'000
I 68 00000000000000
I 68 00000000000000
68 00000:000000000
i 68 00000000000000
68 0000000000000'0
i 68 00000000000000
,t, 68 0000000:OOOOO0:~
1 68 00000000000000
i6,8 O0000:O0000000'.O
~oooooooooooooo
i~:=~ oooooo.oooooo
oooooooooooooo
~ oooooooooooooo
!
68
00000000000000
i~ 68 0:0000'000000000
68 00000000000000
O'OOO00000OO000
i~ 00000000000000
I68 00000000000000
,~, oooooooooooooo
t~'~ °°oooooooooooooo° o. oo o oooo~oo
i~ oooooooooooooo
oooooooooooooo
1~ OOooooooooooooooO ooo,:oo.ooo
I~:~ oooooooooooOOOoooooooooooooo
68 00000000000000
~ 68 00000000000000
I ~ ooooooooooo=ooo
bVP 010.H02 VER[F[CA?[ON b~STING PAGE
NTDT P$5 CPS O0 390
FTDT PS5 CPS O0 39!
O0 0 0 4
O0 0 0 4
DEPT
NTDT
TEAT
~TDT
?RAT
NTDT
TROT
~T~T
109~
4
159~
120~
1387
0000 ~R
3906 GR
0000 FTDT 322
3555 GR 43
0000 FTOT 285
4766 GR 50
0000 FTDT 452
5313 GE 59
0000 FTDT 77
0 2500 SXGM
41 9375 BACK
0000 SXG~
3750 BACK
7 $IGM
,~000 SXGM
938 BACK
O0 SIO~
5000
DEPT
TRAT
NTDT
TRAT
NTDT
TRAT
?RAT
NTDT
TRAT
~TDT
1170~.0000 G~
,3242 OR
167~ 0000
.4219
1635 0000 FTDT
4 2930 OR
1540 0000 FTDT
4 5273 QR
1673 0000 FTDT
9
2
49!
52
464
56
455
0938 5ZGM
.9687 BACK
7500 SXGM
0000 BACK
7500 SXGM
,5938 BACK
0000 SIGM
.4063 BACK
~00 SIC~
50 BACK
2500
DEPT
TRAT
NTDT
TRAT
NTDT
TRAT
NTDT
TRAT
NTDT
TRAT
NTDT
1160~00 GR
39~ GR
996,5000 FTDT
926 0 FTDT
2'8359 OR
'0000 FTDT
1010~5000 FTDT
os:] sza.
BACK
25 BACK
434,?~00
TRAT
NTDT
?RAT
NTDT
TRAT
NTDT
TRAT
TRAT
NTDT
· OR
78~.~00 FTDT
45 OR
'0000 FTDT
58~'5723 OR
5:0000 FTDT
892.5957 QR
85~.~000 FTDT
· 246 GR
R09,5000 FTDT
i 9,4688 SXGM
2,453i BACK
393,7500 SXGM
_32,~062 BACK
311,2500 $IGM
33,~938 BACK
424,2500 SZGM
37,8125 BACK
410,2500 SZGM
_{?.7813 BACK
377.7500
68 00000000000000
68 000000.00000000
48,5625 FSIG
392,00100 FBAC
50,5938 FSIG
1478;0000 FBAC
52.1875 FSlG
2{%6;0000 rBAC
49,2500 FS~
54,0000 FS~G
2~40e0000 FBAC
56,5313 FSlG
447,2500 rs~c
54.9687
53.5938
1993'0000 FBAC
55'4063 PSIG
X~53'0000 FBAC
55,9375
2~90;0000 rBAC
24,57~[ FSZG
23,9375 FSZG
i~3~O00O FBAC
'27.9906 rSZG
1916;~.0:000 FBAC
25,t250 r$~G
2'Ot?iOOO0 FBAC
24,9687 FS~G
2{66,0000 FBAC
46 8750
%25 62;$0
42 6250
349 2500
49 0938
5625
395 7500
47 3438
.5 $4 0 O00
52 6875
* 50
328; ~5:90
50,9062
41.4' 0'000
51,5938
420'0000
52,6250
5 % 3. S000
93?5
7500
6125
347 250.0
20 953i
360 2500
19 62S0
384 OO0O
20 0156
436 7500
$OOG
21,1719
3~ :S:O004063
22,2187
3~7' ~500
22,4531
bVP 010,H02 VERIFICATION blS?ING PAGE
DEPT
?RRT
~? 108{
?RAT
N?~T 107~
NTDT 991
~TDT ~052
~TDT 1097
11400 0000 GR
2 5410 gR
13
0000 F?DT
~430 GR 15
oooo rTOT 521
O0 rTDT
5352 ~R 22
0000 rTDT 513
5879 GR 24
0000 rTDT 510
2344 SIG~
3906 BACK
0000 5iG~
2891 BACK
5000 SlG~
q813 BACK
2500 SIGM
3125 BACK
0000 SIGM
9062 BACK
0000
OEPT 1130~
TRRT
NTDT 949
TRAT 2
NTDT 970
TART 2
NTDT
TRAT
NTDT 965
TART 2
NTDT 820
0000 GR 8
1582 GR 11
0000 FTDT 544
2012 GR 15
5000 rTDT 540
2168 GR 2~
5000 FTDT 55~
1816 GR 22,
0000 PTDT 54~,
0781 GR
0000 FTDT 499
75
BACK
50OO SIGN
2578 BACK
o000
8281 BACK
,0000 STGM
250 BACK
000
7500
DEPT 1120~
TRAT
NTnT 1414
TRAT 2
~TDT 138~
TRAT
NTDT 127;
TRAT
NTDT 1477
TRAT 2
NTDT 1465
0000 OR
4570 OR
0000 FTDT
4902 OR
0000 FTDT
rTDT
5254 GR
0000 PTDT
2324 GR
0000 rTDT
3,781 SIGN
5,531~ BA:C~
704,000 SXGM
675.0000 SZGM
27 ~939 BACK
oooo
1 5000 SIGN
7~5 7500 BACK
784 0000
DEPT 1110~
TRAT
~TDT 156;
TRAT
MTDT 1568
TRAT 2
NTDT 144~
TRAT
NTDT 150~
TRAT
NTDT 166~
O0 Gfl
0000 G~PI
6035
0000 PTDT
5098 GR
0000 rTDT
6094 OR
0000 rTDT
0000
t l,6016 SiGN
?,0781 BACK
717,0000
24,5156 BACK
737,0000 SIGN
29.4844 BACK
703,50 SIGM
,6563 BACK
76~,~000
OEPT
TRAT
NTDT
TRAT
NTDT
?RAT
7266 GR
77,6875 SiGN
93,~X25 BACK
753,5000 SIG~
97,~7S0 BACK
793,5000 SIGN
~0~250 BACK
!7
t~76
16
1949
17
2:056
16
2242
8125 FSIG
0000
6563
0000 r8AC
62~0 FSZG
0000 FBAC
7500 FS~G
FBAC
14
1359
!
2362~
6641
000o
7734 r$IG
OOOO
8047
oo00
1562 rSZG
000FBAC
734 FSIG
0000
19,2656
18,9844 r$IG
197t~00~0 FBAC
18.5469 FSIG
21%0,;00~0 FBAC
20,25'00
20,2187 r~iG
234~*0000 rBAC
OOPO FSAC
17.4531
1925;0:000 FSAC
17,7813
-2~76.0000 rBAC
16.9531 PSZG
2Ii4,0000 FBAC
17,5156 PS~G
2326*0000
'17,2500 FSIG
1909~0000 FBA:C
1'7.4688
2S26~0000 FBAC
17;7i88
2~92,0000
200,0000
15,6875
3t4;5'000
14,3750
324'7500
15,5938
401,5.000
14,92!9
420,2500
12 0078
210 6250
Il 6172
274 75100
12 1172
335 2500
!2 140b
351S~O0
11 7734
405:,25,00
!6,3750
441,250'
32,?5:00
14,0703
!4,2i09
396~-25'0i0
i3.9453
482~5:000
5i4,60i6
83,0000
i4,2i09
32,0000
LVP 010.H02 V£RIFICATION LISTING PAGE 6
NTDT
TRAT
NTDT
TRAT
NTDT
059 0000 FTDT
! 8027 GR
~7 0000 FTDT
I]2 7~93 ~R
734 0000 FTDT
74~,0000 SIGN
10,$125 BACK
7 ,: ooo
5~.0000
DEPT 10900
TRAT 3
NTDT 1788
TRAT 3
~TDT 180~
TRAT
NTDT 180~
TRAT
NTDT 1o4;
TRAT
NTDT 1721
0000 FTDT
2676 OR
0000 FTDT
2656 GR
000 FTDT
207 GR
000 rT~T
266 GR
0000 FTDT
28 4531 SZGH
36 103750 BACK
000
715
43
694
53
692
56
687
SIGM
BACK
0000 SIGN
,6875 BACK,
25 BACK
5000
DEPT 10860
TRAT 4
NTDT 182~
TRAT
NTDT 1969
TRAT 4
NTDT 2031
TRAT 4
NTDT 1975
TRAT 4
NTDT 1869
0000 GR
4805 GR
0000 ~IDT
5078
0000 FTDT
3516 GR
0000 FTDT
6328 GR
o000 FTDT
4688 GR
0000 rTDT
3
531
568
60
¢0
? SIGR
50 BACK
5000 SIGM
0000 BACK
0000 SIGM
6875 ~ACK
5000
5000 ~ACK
0000 SIGA
~750 BACK
0000
*$ FILE TRAILER
rILE NAME {EDTT ,001
SERVICE NAME
VERSION #
DATE
MAXIMU~ LENGTH I 1024
rILE TYPE
NEXT rILE NAME
EOF **********
** TAPE TRAILER
SERVICE NAME IEDIT
DATE 184/09/ 2
ORIGIN 30000
TAPE NAME 19410
CONTINUATION # 101
NEXT TAPE NAME {
COMMENTS {
REEL TRAILER
18.7188 F$IG
2a 14' 0000 teAC
16,3906 FSIG
2 $ 3~ 8., 0 O00r B AC
24,6094 F$IG
1879.0000 teac
24,i562 FSiG
2~40,0000
24.3750 F$iG
2250:';0~00
25,5156 F$iG
2418.'00~0 FBAC
25,3906
· 24t4'0000 FBAC
37.1562
1907'0000
36,5313
2190~00~0
35,8437 F$IG
2394,0000 FaAC
37,5313 rSIG
,,oooo
,7188 FSiG
2S~2;0000 FBAC
14,1641
63~,5000
14,1094
689,0000
21 3906
435
21 3438
4970000
4844
2~
'52550.00
2!
5'9:0000
586 0000
36 ~0313
568 ,SO00
37,0313
60~i:0~00
37 4698
'II o,o.:o
659-~000
LVP 010,H02 VERIFICATION LISTING
PA.G~
SERVICE NAME {EDIT
DATE IR4t091 2
ORIGIN {
REEb NAMF S
CONTINUATION # :01
NgXT REEL NAMg :
COMMENTS :
v
~mmmmmmmmmmmmmmmmmmmm~
bls TAPE
VERIFICATION LISTING
bVP 009.H03 VERIFICATION LISTING
PA~E
** REEL HEADER
SERVICE NAME :$ERVIC
DATE :81/08/ 8
ORIGIN :
REEL NAM~ IREEL ID
CONTINOATION # :01
PREVIOUS REEL
COMMENTS :~EEL COMMENTS
** TAPE PEADER **
SERVICE ~AME :SERVIC
DATE :81/08/ 8
ORIGIN :F$1A
TAPE NAME :
CONTINUATION # :0~
PREVIOUS TAPE :
COMMENTS :TAPE COMMENTS
EOF
** FILE HEADER
FILL NA~R :SERVIC.O01
SERVICE NAME :
VERSION #
DATE :
MAXIMUM LENGTH : 1024
FILE TYPE :
PREVIOUS FILE :
** INFORMATION RECORDS
MNEM CONTENTS
CN : SOHIO ALASKA PETROLEUM COMPANY
WN : J-~3. 9'~ N-13E
FN : PRUDHO[ BA~
RANG: ~ANGE
TOWN: TOWNSHIP
SECT: SECTION
COUN: ~ORTH SLOPE
STAT: ALASKA
CTRY: USA
MNEM CONTENTS
PRES: NEDIT4F
** RECORD TYPE 047
** RECORD TYPE 047
UNIT TYPE CATE SIZE CODE
000 000 030 065
000 000 018 065
000 000 012 065
000 000 005 065
000 000 008 065
000 000 007 065
000 000 012 065
000 000 006 065
000 000 004 065
UNIT TYPE CATE SIZE CODE
000 000 007 065
LVP 009.b03 VERIFICATION LISTING
PAGE
RECORD TYPE 047
JOB 10707,62056
TDT RUN #1, 30'jUL'8!
BTM. LOG INTERVAL
TOP LOG INTERVAL
TYPE FLUID IN HOLE
CASING SIZE
CASING SIZE
11732
10750
OIL
7 IN.
9.625 IN.
SURF. TO 10264
SURF. TO 10780
** DATA FORMAT RECORD
ENTRY BLf]CKS
TYPE SIZE REPR CODE ENTRY
4
8 4 73 6O
9 4 65 .lIN
0 1 66 0
DATUM SPECIFICATION BLOCKS
MNE~ SERVICB SERVICE UNIT API APl AP1 APl FILE SIZE PROCESS SAMPLE REPR
ID ORDER # LOG TYPE CLASS ~OD NO. LEVEL CODE
DEPT FT 0 0 0 0 0 4 0 1 68
SIGM TDT CO 0 40 1 0 0 4 0 i 68
FSIG TDT 0 0 0 0 0 4 0 ! 68
TRAT TDT 0 42 1 0 0 4 0 ! 68
NTDI TDT CPS 0 0 0 0 0 4 0 1 68
bVP 009.H03 VERIFICATION 6ISTING PAGE 3
FTDT ?D? CPS 0 0 0 0 0
GR TDT GAPI 0 31 32 0 0
BACF TD? CPS 0 0 0 0 0
FBAC TDT CPS 0 0 0 0 0
GSF T~ 0 0 0 0 0
** D
DEPT
NTDI
FBAC
DEPT
NTD'I
FBAC
DEP~
NTD~
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTD~
ATA *~
11750.
-999,
-999.
11700.
512.
60,
11600.
378,
39.
11500.
336.
44.
11400,
371,
46.
11300,
346,
63,
11200,
405.
74.
11100.
562.
80,
11000,
7
10900.
584.
121.
10800,
734.
113,
~0743.
686.
50
25
25
O0
5O
56
O0
75
40
00
00
34
00
75
25
O0
25
03
O0
25
62
O0
50
31
00
00
O0
37
00
50
18
5o
SIGM
FTDT
FTDT
SIGM
FTDT
GSF
S1GM
FTDT
8IGM
FTDT
GSF
FTDT
GSF
SIGM
FTDf
GSF
FTDT
GSF
SIG~
FTDT
GSF
SIGM
FTDT
GSF
8IGB
FTDT
GSF
SIGM
FTDT
-999,250
-999.250
'999,250
47,188
145.750
1.000
21,219
181,125
1.731
21.688
130,000
1.731
17.328
188.625
1.731
13.719
176.875
1.731
17.922
217,625
1.731
1b.531
257.~50
1. 31
15.484
220.250
1,731
23.578
229.750
1,000
35.781
226.250
1,000
35.750
186,875
FSIG
GR
FSIG
GR
F$IG
F$IG
GR
F$IG
GR
FSIG
GR
FSIG
GR
FSIG
GR
F$IG
GR
FSIG
FSIG
GR
F$IG
GR
-11,727
-999.250
40.03i
48,156
17.2~0
18.844
18.672
29.109
14.672
11.188
11.898
8,602
14,445
20.891
13.836
20.156
12.820
79.375
21.359
34,344
3t.172
62.375
'ao.828
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BAC~
TRAT
BACK
TRAT
BACK
TRAT
BACK
I 68
1 68
1 68
-999.250
-999.250
3.254
130.625
2,545
177.750
3 252
2.465
253.000
2.240
298.250
2.359
329.750
2,625
357.750
1,704
379,750
3,240
424,250
4.305
415.250
4,563
410,000
VERIFICATION LISTING
FBAC 106.625 GSF
1.000
** FILE TRAILER
FILE NAME :SERVIC.O01
SERVICF NAME :
VERSION #
DATE :
MAXIMUM LENGTH : 1024
FILE TYPE :
NEXT FILF NAME
PAGE
,~ FILE HEADER
FILE NAME :SERVIC.O02
SERVICE NA~E :
VERSION ~ :
DATE :
NAXIMUM LENGTH : 1024
FILg TYPE
PRE¥IOU& FILE
** INFORMATION RECORDS
MNE~ CONTENTS
PRES: ~iEDIT4F
** RECORD TYPE 047
** RECORD TYPE 047 **
** RECORD TYPE 047
UNIT TYPE CATE SIZE CODE
000 000 007 065
** DATA FORMAT RECORD
ENTRY BLOCKS
TYPE SIZE REPR CODE ENTRY
4 1 66
~ 4 73 60
9 4 65 .liN
0 1 66 0
DATUM SPECIFICATION BLOCKS
MNEM SERVICE SERVICE UNIT ~PI API APl APl FILE SIZE PROCESS SAMPDE REPR
LOG TYP~ CLASS MOD N~. ~EVEL CO~E
ID ORD~R~ F~ 4 0 1 6
CU
DEPT 0 0 0 0
SlGM 'rOT 0 40 1 0 0 4
FMIG TD'r 0 0 0 0 0 4
TRAT TOT 0 42 1 0 0 4
NTD~ TDT CPS 0 0 0 0 0 4
FTDT TDT CPS 0 0 ~ 0 0 4
68
68
68
~8
VERIFICATION
BACK TDT CPS
FBAC TDT CPS
5ISTING
PA~
i 68
I 68
1 68
** OATA **
DEPT
NTDT
FBAC
11751
-999
-999
DEPT
NTDT
FBAC
11700
547
77
DEPT
NTDT
FBAC
11600
403
117
DEPT
NTDT
FBAC
11500
305
108
DEPT
NTDT
FBAC
11400
413
82
DEPT
NTDT
FBAC
11300
334
80
DEPT
NTOT
FBAC
11200
401
86
DEPT
NTDI
FBAC
11100
530
89
DEPT
NTDT
FBAC
11000
347
107
DEPT
NTDT
FBAC
10900
590
132
DEPT
NTDT
FBAC
10800
762
122
DEPT
NTDT
FBAC
10746
706
166
,500
,250
,250
,000
,000
.875
,000
.250
.000
000
50O
875
000
000
688
000
750
312
000
000
938
000
500
625
000
500
~25
000
000
875
000
000
875
bO0
500
625
FTD
FTO
GSF
SIG
FTD
SIG
FTO
$IGM
FTDT
$IGM
FTOT
GSF
FTDT
FTDT
GSF
SIGN
FTOI
GSF
SIGN
FTDT
GSF
SIGM
FTDT
SIG~
FTD~
GSF
-999,
=999.
-999.
50.
141.
O.
21.
170,
1.
20,
139.
1,
17.
200.
1.
13,
180.
1.
i7.
203.
1.
16.
264.
1.
15,
232.
1.
23.
233.
1.
35.
234.
1.
36.
177.
1.
250
250
250
031
625
577
797
000
73i
484
500
731
578
500
731
281
625
731
813
750
731
328
250
731
695
375
731
031
250
000
625
625
000
125
000
000
FSIG
GR
F$IG
GR
FSIG
GR
FSIG
GR
F$IG
GR
F$IG
FSlG
GR
FSIG
GR
FSlG
GR
F$IG
GR
FSlG
GR
FSIG
GR
-999,250
56,406
41.625
53.281
18.875
34.312
16.359
38.291
14,461
22.734
11,211
21.672
13.914
33,281
13.641
32.969
12.492
97,750
18,953
51,156
32.531
7b.6~8
37.250
57.791
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
214.250
-999.250
3 576
374:750
2,027
412.750
3.207
401.750
2,211
403,250
2.023
416.000
2.113
429,250
2,447
440,750
1.662
458.000
3 053
492:750
4.453
5.375
468,000
LVP 00g. H03 VERIFICATION LISTING
PAGE 6
** FILE TRAILER
FILE NAME :SERVIC,O02
SERVICE NAME :
VERSION #
DATE :
MAX1MUM LENGTH : 102~
FILE TYPE
NEXT FILE NA~E :
EOF
** FILE HEADER
FILE 'gAME :SERVIC.O03
SERVICE NAME
VERSION #
DATE :
MAXIMU~ LENGTH : 1024
FILE TYPE
PREVIOUS FILE
** INFORMATION RECORDS
MNEM CONTENTS
PRES: NEDIT4F
RECORD TYPE 047 ~
RECORD TYPE 047 *~
RECORD TYP~ 047 **
UNIT TYPE CATE SIZE CODE
000 000 007 065
~* DATA FORMAT RECORD
ENTRY
TYPE SIZE REPR CODE E~TRY
4
~ 4 73 60
9 4 65 .lin
0 ! 66 0
DATUM SPECIFICATION BLOCKS
MNEM SERVICE SERVICE UNIT APl API APl APl FILE SIZE PROCESS SAMPLE REPR
ID ORDER # bOG TYPE CLASS MOD NO, LEVEL CODE
DEPT
SIGH TOT
FSlG TDT
TRAI TDT
NTDT TDT
FTDT TOT
~R TUT
BACK TOT
FT
CU
CPS
CPS
GAPI
CPS
0 0 0 0 0 4
0 4O 1 0 0 4
0 0 0 0 0 4
0 42 1 0 0 4
0 0 0 0 0 4
0 0 0 0 0 4
0 31 32 0 0 4
.o .o o_ _o 9 4
68
6,8
68
68
68
68
68
LVP 009.H03
GSF TDT
VERIFICATION
LISTING
PA~
1 68
** DATA
DEPT
NTDI
FBAC
DEPT
NTDT
FBAC
DEPI
NTD1
FBAC
DEPT
NTDI
DEPT
NTDT
FBAC
DEP%
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDT
FBAC
DEPT
NTDI
FBAC
DEPT
NTDT
FBAC
DEPT
NTDI
FBAC
DEPI
NTDT
FBAC
11751.000
-999.250
-999.250
11700.000
554.000
119,375
11600,000
442.000
111.43~
11500,000
328,000
82,000
11~00.000
454.250
90.375
11300,000
396.75O
91.938
11200,000
404,750
96.438
11100.000
569,500
179.625
11000.000
38b.000
113,063
10900,000
600.000
138.625
10800.000
735.500
263.000
10745,500
686.500
122,938
SIGN
FTDT
GSF
SIGN
GSF
SIGN
FTDT
GSF
SIGN
FTDT
GSF
SIGN
FTDT
GSF
SiGN
FTDT
GSF
SIGN
SIGN
FTDT
FTDT
GSF
SIGN
FTDT
GSF
SIGN
FTOT
FTDT
-999
.-999
999
46
134
1
21
176
1
21
154
1
18
194
I
194
1
18
205
1
16
261
1
15
245
1
22
226
1
37
224
1
35
191
1
.250
25O
:250
.500
.500
.000
.516
.000
.731
.016
.125
.731
,063
.500
.731
.555
.500
.731
.203
.375
,731
,609
.750
.731
.445
,375
.731
.609
.625
,000
.312
.875
,000
.969
.000
.000
FSIG
GR
FSIG
GR
FSIG
GR
FSIG
GR
FSIG
FSIG
GR
F$IG
GR
FSIG
GR
FSIG
GR
FSIG
GR
FSlG
GR
F$IG
GR
-999,250
-999.2~0
40,656
63,438
16.672
43.000
18.813
50.5tl
16.516
32,156
11.234
32,813
13.813
43.688
14.352
46.625
13,094
103.875
18.875
56,750
40.781
85.625
30.156
74.375
TRAT
BACK
TRAY
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
BACK
TRAT
BACK
-999.250
-999.250
3.053
443.250
2.590
446,250
2.818
436.250
2,465
437.750
2.188
446.250
2 088
450:750
2.686
487.750
1.728
474.500
3.104
510.250
4,477
527,500
4.488
483,000
LVP 009.H03 VERIFICATION LISTING
FILE NAME :SEBVIC.O03
SERVICE NAME :
VERSION # :
DAT~ :
~AXIMUM LENGTH : 1024
FILE TYPE :
NEXT FILE NAME :
** FILE H~ADER
FILE NAME :SERVIC,O04
SERVICE NAME
VERSIO'~ #
DATE :
MAXIMUM LENGTH : 1024
FILE TYPE
PREVIOUS FILE
** INFORMATION RECORD&
MN~M CONTFNTS
PRES: NEDIT4F
RECORD TYPE 047 **
RECORD TYPE 047 **
RECORD TYPE 047 **
UNIT TYPE CATE SIZE CODE
000 000 007 065
** DATA FORMAT RECORD
ENTRY ~50CKS
TYPE SIZ~ REPR CODE ENTRY
8 4 73 60
9 4 S5 .lin
0 1 66 0
DATUM SPECIFICATION BLOCKS
MNE~ SERVICE SERVIC~ UNI1 API APl AP1 API FILE SIZE PROCESS SAMPLE REPR
ID ORDER # LOG TYPE CLASS MOD NO. LEVEL CODE
DEPT FT O 0 0 0 O 4
SIGM TUT CU 0 40 I 0 0 4
FSIG TOT 0 0 0 0 0 4
TRAT TDT 0 42 ! 0 0 4
NTDT TOT CPS 0 0 0 0 0 4
FTDT TDT CPS 0 0 0 0 0 4
GR TOT GAPI 0 31 32 0 0 4
BACK YDT CPS 0 0 0 0 0 4
FBAC TDT CPS 0 0 0 0 0 4
68
68
68
68
68
68
68
68
8_
LVP 009.H03 VERIFICATION LISTING
p~ 9
DATA
DEPT 11751.000 $IGM -999
NTDI' -999.250 FTDT -999
FBAC -999.250 GMF -999
DEPT 11700.000 SIGH 45
NTDT 491.750 FTDT 115
FBAC 133,500 ~$F 1
DEPT 11600.000 SlGM 21
NTDT 406,750 FTD~ 166
FBAC 97,250 GSF
DEPT 11500.000 ~IGM 20
NTDT 313,250 FTDT 146
FBAC 81,750 GSF
DEPT 11400.000 SIGM 17
NTDT 401,500 FTDT 175
FBAC 67.625 GSF
DEPT 11300,000 SIGM 13
NTDI 328 250 FTDI 175
FBAC. 82:250 GSF 1
DEPT 11200,000 SIGH 17
NTDT 407,750 FTDT 220
FBAC 97,000 GSF 1
DEPI 11100,000 SIGH 16
NTDI 576,000 FTDT 250
FBAC 94,063 GSF
DEPI 11000.000 SIGH 15
NTDT 377,250 FTDT 252
FBAC 112,063 GSF
DEPT 10900,000 SlGM 23
NTDT 554.500 FTDT 227
FBAC 134,750 GSF 1
DEPI 10800,000 SIGH 35
NTDI 765,500 FTDT 214
FBAC 119,875 GSF
DEPT 10746,000 SIGH 35
NTDT 665.500 FTDI 190
FBAC 116.000 GSF
** FIbE TRAIbER
FILE N~ME :SERVIC,O04
SERVlCF ~.,'E
.250
.250
.250
.219
.000
.000
.813
.250
.731
.547
.625
.731
.219
.375
.731
.523
.875
.731
.688
,875
.731
,406
.875
.731
.180
.125
.73I
.047
,750
,000
,875
,750
.000
.500
,500
.000
FSIG
FSIG
GR
FSIG
GR
FSIG
GR
F$IG
GR
FSIG
GR
FSIG
GR
FSIG
GR
FSlG
GR
FSlG
GR
FSlG
GR
FSlG
GR
4.039
-999,250
32.250
67,500
19.156
46.125
15.914
51.219
14.422
35.5~I
11.180
32,469
13.578
47,375
13,758
48,375
13.102
116.375
20,141
65,688
31.297
86,063
.31.828
72,50O
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
-999.250
-999,250
2.867
338,500
1.905
356.500
2,908
348,000
2 244
7 :5oo
2.139
396,750
2.387
412.500
2.551
428,000
1,650
449,250
3.150
483.750
4,359
471.750
4,652
460,500
1
LVP 009.~03 VERIFICAIiON L~STING
PAGE
VERSION $ :
DATE :
MAXIMUM LENGTH : 1024
FILE TYPE :
NEXT FILE NAME :
** fILE HEADER **
FILE NA~E :SERVIC,O05
SERVICE NAME :
VERSION ~ :
DATE :
MAXIMU~ £ENGTH ~ 1024
FILE TYPf :
PREVIOUS FILE :
** INFORMATION RECORDS **
MNEM CONTFNT~
mmmm mmmmmmmm
PRES: NEDIT4F
** RECORD TYPE 047
** RECORD TYPE 047
** RECORD TYPE 047 **
UNIT TYPE CATE SIZE CODE
000 000 O07 065
DATA f'ORMAT RECORD **
ENTRY 5LOCKS
TYPE SIZE REPR CODE ENTRY
4 ~ 66 1
~ 4 73 60
9 4 65 ,lin
0 ~ 66 0
DATUM SPECIFICATION BLOCKS
MNE~ SFRVICE SERVICE UNIT API API APl AP~ FILE SIZE PROCESS SAMPLE R~PR
ID ORDER # LOG TYPE CLASS MOD NO. bEVEL CODE
DEPT FT 0 0 0 0 0 4
SIG~ TOT CU 0 40 1 0 0 4
FSIG TOT 0 0 0 0 0 4
TRAT TOT 0 42 1 0 0 4
NTDT ~DT CPS 0 0 0 0 0 4
FTD2 TDT CPS 0 0 0 0 0 4
GR TDT GAPI 0 ~1 ~2 0 0 4
BAC~ TOT CPS 0 0 0 0 0 4
FBAC ~DT CPS 0 0 0 0 0 4
~SF TOT 0 0 0 0 0 4
68
68
68
68
68
68
68
68
LVP 009.H03 VEPIFICATION LISTING
DEPT 11755,000 SIGH
NTD~ -999.250 FTDT
FBAC -999,250 GSF
DEPI 11700,000
NTDT 492.250 FTDT
FBAC 148.125
DEPT 11bO0,OOO S1GM
NTDT 400,000 FTDT
FBAC 106.188 GSF
DEPT 11500.000 SIGM
NTDI 365.500 FTDT
FBAC 134.500
DEPT 11400.000
NTDT 416.750 FTOT
FBAC 100.312
DEPT 11300.000 SIGH
NTB? 342,000 FTDT
FBAC 90.063 GSF
DEPT li200.000 SIGH
NTDt 423 500 FTDT
FBAC 103:375 GSF
DEPT 11100.000 SIGH
NTDT 577.000 FTOT
FBAC 134.000
DEPT 11000.000 SIGh
NTDT 420.500 FTDT
FBAC 114.250 GSF
DEPT 10900.000 SIGH
NTDT 595,500 FIDT
FBAC 136.750 GSF
DEPT 10800,000 SIGH
NTDT 728.000 FTDT
FBAC 124.813 GSF
DEPT 10746.500 SIGH
NTDI 699.000 FTDT
FBAC 1i6.188 GSF
** FILE TRAILER
FILE NA~E ~SERVIC.O05
SERVICF ~AME
VERSION ~ :
DATE :
-999.250
-999.250
'999.250
45.219
126.375
1.000
21.750
168.250
1.73!
22.469
152.250
1.73!
17.641
205
13.742
167.125
1.73~
17.734
201.250
1.731
16.438
259.250
1.731
15.656
2~6.500
~.73!
23.109
219.125
1,000
36.063
224.375
1.000
202.750
1.000
FSIG
GR
F$IG
GR
FSIG
GR
FSlG
GR
FSIG
GR
FSIG
GR
FSIG
F$IG
GR
F$IG
GR
FSIG
GR
FSIG
GR
5.789
-999,250
42,469
67,563
17.281
52.094
19.625
14.438
36.9~8
11,250
40.594
13.8~0
49.688
t4.563
55.000
13,242
120.OO0
18.875
68.438
31.844
93.500
30.734
89.938
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
bACK
TRAT
BACK
TRAT
BACK
TRAT
BACE
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
TRAT
BACK
-999.250
-999.250
3.156
410.000
2.871
407.750
421,250
2.258
427.250
2.189
438.250
2.086
450.250
2.641
470,750
1.659
477.500
3.148
503.750
4.371
489.000
4.594
475.000
LVP 009.M03 VERIFICATION LISTING
PAGE ~2
MAXIMUF LENGTH : 1024
FILE TYPE :
NEXT FILE NAME :
** TAPE TRAIL~ **
SERVICE NAME :SkRVIC
DATk :~1/08/ 8
ORIGIN
TAPE NAME
CONTINUATION # :01
NEXT TAPE NA~E
COMMENTS :TAPE COMHEMTS
** REEL TRAILER **
SERVICE NAME :SER¥IC
DATE :81108/ 8
ORIGIN :
REEL NAME :REEL ID
CONTINUATION # :01
NEX% REEL N~E
COMMENTS :REEk COMMENTS
,~*****~** EOF
DATA 1,< F.C UkD,S
I~F. NGI'tt ti}, LAST l~Ctmo: 518
F Ik, b. IRA/[,ER
I,ENG'I'Id: ~2 B~Tk$
t' [l,E NAME: kDl'l .001
~AXIMUM PHYSICAL PLCURD LENGTH:
NkXT tILE. NAME:
1024 BYTES
TAPE 'rRAILEP
L}.,NGI'lt: I ~2 B~/TES
TAPE, NAgE: blOt(} DATE: 80/10/
5EI~V ICE NAME: EDIT
tAFF, CONTINUATION NUP~BE~: Ol
NkXT 1APE NAME:
CtJ~ME, N~5: UNIQUE WELL IDENTIfiCATION NUMBER 1S 50-029-20497
DE. PTH
tlO0.O00
~000. O00
2900.000
28OO. O00
2700.000
aNLMUNIC
GR
NPHI
SP
NPHi
FCNL
SP
G~
NPHI
FCNL
8P
GR
NPH 1
1~ CNI.,
SP
614
NPHi
[,CNL
VALUE
-75.250 79.125
-999.250-999.250
-92.b88 75.500
-999.25O-999.250
-114.81] 5~.125
-999.250-999.250
-110.500 42.719
-999.250-999.250
-91.875 75.500
-999.250-990.250
-999.250 45.125
-999.250-999.250
EMUNIC
ILD
GR
RHOB
1LD
GR
RH£]B
1LD
GR
G~
1 LD
GR
RH(]B
GR
I hD
GR
GR
RHLJB
VALUE
2.996
-999.250
-999.250
-999.25o
}.18t
-999.250
-999.250
-999.250
1.788
-999.250
-999.250
-999.250
2.760
-999.250
-999.250
-999.250
5.705
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
MN
~.MUNIC
IbM
CAbi
NRAT
DT
IbM
CALk
NI~AT
DT
CALl
NRAT
DT
ILM
CALl
NRAT
CALl
i4RAI
CALl
NRAT
DT
VALUE
2.877
-999.250
-999.250
-999.250
3.314
-999.250
-999.250
=999.250
2.045
-999.250
-999.250
-999.250
3.070
-999.250
-999.250
-999.250
3.391
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
MNeMONiC
bhSU
DRHU
NCN~
DRHU
NCNL
DRHU
NCNL
LLSU
DRHO
NCNb
LLSU
DRHU
NCNb
LL8U
DRHO
NCNL
VAbUE
1.971
-999.250
-999.250
3.240
-999./50
-999.250
2.230
-999.250
-999.250
3.705
-999.250
-999.250
2.783
-999.250
-999.250
-999.250
-999.250
-999.250
4200.000
4100.000
4000. O00
39O0. 000
3800.000
3700.000
3600.000
3500.000
5400.000
3300.000
3200.000
NNLM(JNIC
SP
GR
NPHI
~CNL
SP
NPM]
~ CNb
NPHi
at-'HI
1' C~L
SP
GR
SP
NPHI
~CNb
GR
NPHi
FCNL
SP
NPHi
FCNb
SP
GR
NPtll
fCNL
SP
NPHI
FCNL
SP
GR
NPNI
fCNL
VAL
-104 5o
-999-999
-88
-999
-999
-140.
-999.
-999.
-82.
-999,
-999.
-90. 70.
-999.-999.
-132. 54.
-q9g.-999.
-lOb. bi.
-999.-999.
-143. 43.
-q99.-999.
-88. 79.
-999.-999.
-129.
-999.
-999.
-82. 65.
-999.-999.
UP.
.8
.8
.5
.2
.2
1)
63
5 0
50
75
50
50
50
19
50
50
25
50
5O
38
O0
50
50
O 0
5O
5O
75
31
50
50
5O
b9
50
50
0 0
50
50
25
75
5O
5O
38
13
50
50
Mm~MUNIC
I hD
RHOB
GR
ILO
GR
[-{HOB
GP
IL!.)
GP
I~HUN
GR
1 LD
RHOB
GR
lCD
GR
GR
iLD
GR
RHUB
GR
ILL)
GR
RHOB
GR
ILO
GR
RHUB
G~
ILD
GR
RHtJI~
GR
1LO
GR
RHL}O
GR
ILO
GR
RHUB
GR
VAbU
0
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
0
-999.
-999.
-999.
0
-999.
-999.
-999.
-999
-999
-999
0
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
793
250
250
250
035
250
250
250
100
25O
25O
25O
178
250
250
250
336
250
250
250
031
250
25O
25O
617
250
250
250
248
250
250
250
504
250
250
250
262
25O
25O
25O
082
250
250
250
MNLMUNiC
CALl
N~AI
DT
CALl
NRAT
UT
IbM
CALl
NRAT
DI
CALl
NRA1
ut
CALl
NRAT
D1
CALk
NRAI
lbl~
CALk
NRAT
DT
IbM
CALl
DT
CALl
NRAI
DT
CALL
NRA~
UT
IbM
CALl
NRAT
DT
VALU
-999.
-999.
-999.
0
-999.
-999.
-999,
0
-999.
-999.
-999.
.
-999.
-999.
-999.
I
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999,
-999.
0
-999.
-999.
-999.
0
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
180
~5o
~50
000
250
250
250
479
25O
25O
25O
758
250
250
250
586
250
25O
25O
365
250
250
250
O59
25O
25O
25O
498
25O
25O
25O
234
250
250
250
568
250
250
250
O55
25O
250
25O
MNkMONIC
bb8U
DRILL)
NCNb
Lb8U
DRHU
NCNb
bbSU
DRHu
NCNb
LL8O
DRHU
NCNb
bbSU
DRHU
NCNb
LLSO
DRHU
NCNb
bbSU
DRHU
NCNb
bb8O
DRHO
NCNb
bbSU
DRHU
NCNb
bbSU
DRHU
NCNb
bbSU
DRHU
NCNb
VALUE
~.bO9
-999.250
-999,250
4.469
-999.2b0
-999.250
o.010
-999.250
-999.250
4.555
-999.250
-999.250
5.422
-999.250
-9~9.250
~.215
-999.250
-999.250
5.457
-999.250
-999.250
5.141
-999.250
-999.250
4.551
-999.250
-999.250
4.711
-999.250
-999.250
3.299
-999.250
-999.250
DLf'I'H
5 '100. 000
20O. 000
51 O0. 000
5000.000
4900.000
4800.000
4700·000
~600.000
4500,000
4400.000
4300.000
3P
NPH1
FCNb
NPHI
~CNL
NPHI
FCNL
8P
NPHI
,Si-"
GP,
NPHI
~CNL
SP
NPMI
fCNL
SP
GR
NPHi
fCNL
SP
NPH]
~CNL
bP
NPHI
~CNI.,
SP
GR
NPH]
FCNL
NPnl
fCNL
VALU
80.
-999.
-999.
4t.
-999.
-999.
-117. 58.
-999.-999.
-87. 68.
-999.-999.
-101. 53.
-999.-999.
-131.
-999.
-999.
-139. 37.
-999.-999.
-129. 43.
-999.-999.
-136. ]9.
-999.-999.
-147. 32.
-999.-999·
-149. 10.
-999.-999.
000
313
250
250
000
438
250
250
000
250
250
250
875
875
250
250
b25
813
250
25O
500
125
250
250
125
750
250
250
750
844
250
250
875
625
250
250
875
656
250
250
025
906
250
250
MNf, M{JNiC
GR
GR
G~
GR
I i~O
GR
RHOB
IbD
GR
ILD
GR
ILD
GR
GR
GR
GR
GR
1 LD
GR
GR
i6D
GR
RHtJB
GR
1LD
RI-IL) B
GR
;/Ab[.]
i
-999
-999
-999
.
-999.
-999.
-999.
.
-999.
-999.
-999.
·
-999.
-999.
-999.
10.
-999.
-999.
-999.
·
-999.
-999.
-999.
·
-999.
-999.
-qgg.
.
-999.
-999.
-999.
·
-999.
-999.
-999.
·
-999.
-999.
-999.
.
-999.
-999.
-999.
438
250
250
250
188
250
250
250
879
250
250
250
289
250
250
250
000
250
250
250
430
250
250
25O
109
250
250
250
b37
250
250
250
047
250
25O
25O
230
250
250
250
57O
250
25O
25O
MNbMUNIC
ibm
CALl
h~Al'
DT
IbM
CALl
16~
CALl
NF<Ai
ibm
CAbi
NRA1
IbM
CALl
NRAI
DT
CALl
NRAT
IbM
CALk
NRAI
D~
IbM
CALl
NRAT
1bM
CALl
NRAI
iLM
CALk
NRA1
DT
IbM
CALl
N RAI
DT
VAbUL
4.055
-999.250
-999.250
-999.250
3.795
-999.250
-999.250
-999.250
3.1bO
-999.250
-999.250
-999.250
4.227
-999.250
-999.250
-999.Z50
9.b5b
-999.250
-999.250
-999.250
2.674
-999.250
-999.250
-999.250
3.398
-999.250
-999.250
-999.250
3.939
-999.250
-999.250
-999.250
3.0Lb
-999.250
-999.250
-999.250
3.758
-999.250
-999.250
-999.250
2.813
-999.250
-999.250
-999.250
MNEMUNIC
668U
DRHU
NCNb
6bBU
DRHU
NCNb
bbBU
DRHU
NCNb
bbBU
DRHO
NCNb
6680
DRHO
NCNb
LUBU
DRHU
NCNb
bhBU
DRHO
NCNb
LLBU
DRHU
NCNb
6680
DRHO
NCNb
LLBU
DRHO
NCNb
66BU
DRHO
NCNb
VAbUb
3.514
-999.250
-999.250
2·820
-999.250
-999.250
4.523
-999.250
-99~.250
3.140
-999.250
-999.250
13.011
-999.250
-999.250
3.418
-999.250
-999.250
0.020
-999.250
-999.250
5.809
-999.250
-999.250
4.51b
-999.250
-999.250
7.082
-999.250
-999.250
5.313
-999.250
-999.250
0 ¢00. 000
630u.000
e200.O00
6100.000
6000.000
6800.000
57U0.000
5600.000
55O0.0O0
5400.000
MNLMI}N lC
6P
GR
Ni'MI
NPHI
~CNb
SP
GR
~ CNL
G~
NPIt I
}, CNL
SP
NPHI
~CNb
8P
G~
NPHI
PCNL
GR
NPHI
kCNb
SP
GR
NPHI
PCNL
G~
NPHI
PCNL
SP
GR
NPHI
kChL
~P
VALUE
-77.b25 90.750
-999.250-999.250
-141.000 45.125
-999.250-999.250
-9).750 77.188
-999.250-999.250
-147.250 45.594
-999.250-999.250
-]15.438 57.250
-999.250-999.250
-156.250 39.625
-999.250-999.250
-154.250 ~1.781
-999.250-~99.250
-68.750 67.188
-999.250-999.250
-128.750 43.500
-999.250-999.250
-75.125 72.688
-999.250-999.250
-111.063 ~2.06~
-999.250-999.250
MNb~MUN lC
lhD
i~HLIB
RHOB
lED
lED
GR
G~
G~
GR
RH(JB
GR
GR
RHUB
GR
ILL
GB
GR
GR
RHL)B
GR
GR
VALU~
-999.250
-999.250
-999.250
2.250
-999.250
-999.250
-999.250
3.945
-999.250
-999.250
-999.250
1.703
-999.250
-999.250
-999.250
2.740
-999.250
-999.250
-999.250
1.002
-999.250
-999.250
-999.250
1.bOb
-999.250
-999.250
-99q.250
3.773
-999.250
-999.250
-999.250
1.583
-999.250
-999.250
-999.250
2.990
-999.250
-999.250
-999.250
3.355
-999.250
-999.250
-999.250
MNkMUNIC
IbM
CALl
IbM
CALl
NRA'I
IbM
CALl
NRAI
DT
CALl
NRAI
DI'
IbM
CALl
NRAT
DT
CALl
NRAI
IbM
CALl
NRAI
OT
CALl
NRAI
ibm
CALl
DT
CALl
NRAI'
DT
IbM
CALl
N b',AT
DT
VAL, U~s
-999.250
-999.250
-999.250
2.965
-999.250
-999,250
-999.250
3.783
-999.250
-999.250
-999.250
2.025
-999.250
-999.250
-999.250
2.96~
-999.250
-999.250
-999.250
1.264
-999.250
-999.250
-999.250
1.985
-999.250
-999.250
-999.250
3.863
-999.250
-999.250
-999.250
1.885
-999.250
-999.250
-999.250
2.980
-999.250
-999.250
-999.250
3.430
-999.250
-999.250
-999.250
MNEMUNIC
bbBd
DI~HO
NCNb
LLBU
DRHU
NCNb
bbSU
DRHU
NCNb
hhSU
DRHU
NCNb
hhSO
DRHU
NCNb
bbSU
DRHO
NCNb
bbSU
DRHU
NCnb
bbSU
DRHO
NCNb
DRHO
NCNb
bbSO
DRHU
NCNb
LbSU
DRHU
NCNb
VALUE
-999.250
10.656
-9~9.250
-999.250
2.867
-999.250
-999.250
0.762
-999.250
-999.250
5.324
-999.250
-999.250
q.969
-999.250
-999.250
6.367
-999.250
-999.250
2.783
-999.250
-999.250
3.92~
-999.250
-999.2b0
2.40]
-999.250
-999.250
3.914
-999.Z50
-999.250
v
[) E,P'I H
7500.000
7100.000
7200.000
7100.000
7000. 000
6900.000
~B00o000
6700.000
6600.000
6%00.000
MN~MUNiC
GB
NPHI
~CNL
SP
NPH[
i' CNJ,
6P
NPHI
SP
GR
NPH1
J. C~L
NPH1
PCNb
NPHI
~CNL
SP
NPtil
SP
G~
NPHI
[~CNL
SI-'
(,JR
NPI~ I
8P
GP
NPHI
~CNh
VAbU
=bU.
103.
-999.
-999.
-52. 89.
-999.-999.
-50. 96.
-999.-999.
-48. 91.
-g99.-999.
-50. 77.
-99q.-999.
-54. ~1.
-999.-999.
-54. 90.
-999.-999.
-49.
102.
-999.
-999.
-51.
-999.
-g9g.
-69.
-999.
-999.
-84. 54.
-999.-999.
750
125
250
250
531
000
250
250
125
250
250
25O
25O
25O
25O
250
688
250
250
125
375
250
250
000
500
250
250
719
250
250
250
125
813
250
250
500
031
250
250
000
375
250
250
btNkMUN1C
ILD
1Lb
RH{JB
GR
ILD
GR
GR
GR
HHOB
ILD
GR
GR
GR
}{HOB
GR
/LO
GR
GR
ILD
GR
GR
ILD
GR
GR
ILD
GR
RHUB
GR
VALU
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
·
-999.
-999.
-999.
·
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
977
250
250
25O
gl0
250
250
250
401
250
250
25O
070
250
250
250
871
250
25O
25O
406
250
250
25O
813
250
25O
250
273
250
250
250
133
250
250
250
5OO
25O
25O
25O
008
250
250
250
MNbMUNIC
CALl
NRAI
CALl
ILM
CAI: i
IbM
CALl
NRAT
CALl
NRAI
IbM
CALl
NRAI'
CALl
NRAT
Ol
CALl
DT
CALl
NHA£
IbM
CALl
NRAI
D1
i LM
CALl
NRAi
DT
VAbU
t
-999.
-999.
-999.
°
-999.
-999.
-999.
°
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
250
250
250
8bl
250
250
250
391
250
250
250
037
250
25O
250
098
250
250
250
238
250
250
250
797
250
250
250
160
250
250
250
932
250
250
250
6]9
250
250
250
082
250
250
250
MNEMONIC
bbSU
DRtiO
NCNb
bbSU
DRHU
NCNb
LLSU
DRHO
NCNb
LLSU
DRHU
NCNb
L68U
DRHO
NCNb
UHHU
NCNb
bbSU
DRHU
NCNb
6USU
DRHU
NCND
bhSU
DRHO
NCN~
hb8U
DRHU
NCNb
bbBU
DRHO
NCNb
VAbU~
-999.250
-999.250
3.012
-999.Z50
=999.250
2.048
=999.250
-999.250
2.244
-999.250
-999.250
4.14b
-999.250
-999.250
4.580
-999.250
-999.250
3.010
-999.250
-999.250
3.842
-999.250
-999.250
2.924
-999.250
-999.250
2.949
-999.250
-999.250
3.154
-999.250
-999.250
DI: PI'Id
86(}0,000
850U,000
8400,0u0
8]00.000
~200.000
a ~ 90. 000
8000,O00
?900.000
?800.000
7700.000
lb00,000
M N
L~,~ LJN lC
Git
5P
GH
NPH1
SP
GH
NPH 1
NPH I
8P
NPHi
I'CNL
G~
NPHi
i' ('NC
SP
t~CNL
8P
NPHI
["CNG
SP
GH
NPal
fCNL
~P
NPHI
f CNI~
NPMI
VALUr.
2o4,B15
-999.250
-999.250
-56.125
170.250
-999.250
-999.250
-53.500
115.68H
-999.25O
-999.250
-41.250
109.188
-999.250
-999.250
-54.000
145.125
-999.250
-999.250
-49.000
172.500
-999.250
-999.250
-41.625
189.750
-999.250
-999.250
-41.125
ltl.000
-999.250
-999.250
-42.875
165.125
-999.250
-999.250
-43.375 85.025
-999.250-999.250
-48.875
134.250
-999.250
-999.250
M Iq
LMONiC
ILD
HHUB
Gl-,
ILl)
GR
RHOB
GH
1Lb
ILO
ILD
GR
RH(JB
lCD
ILD
GR
RHUB
1 LD
GH
}{HUB
lCD
GR
GR
ILD
RHOB
ILD
GR
VAb
5
-999
-999
-999
5
-999
-999
-999
7
-999
-999
-999
-999
-999
-999
5
-999
-999
-999
3
-999
-999
-999
2
-999
-999
-999
1
-999
-999
-999
1
-999
-999
-999
2
-999
-999
-999
4
-999
-999
-999
UE
.645
.250
.250
.250
.029
.250
.250
.250
.441
.250
.250
.250
.779
.25O
.25O
.250
.852
.250
.250
.250
.529
.250
.250
.250
.053
.250
.250
.250
.432
.250
.250
.250
.553
.250
.250
.250
.527
.250
.250
.250
.199
.250
.250
.250
MN
LMUNiC
ibm
CALl
ibm
CALi
NRAT
UT
IbM
CALl
Ol
IbM
CALl
D[
IbM
CALl
DT
IbM
CALl
NRAI
Ul
IbM
CALl
NHAI
DT
ILM
CALl
NRA~
UT
IbM
CALl
DT
CALl
UT
CALl
NRAI
DI'
VAhUL
5.477
-999.25o
-999.250
-999.250
5.516
-999.250
-999.250
-999.250
7.254
-999.250
-999.250
-999.250
3.723
-999.250
-999.250
-999.250
5.824
-999.250
-999.250
-999.250
3.561
-999.250
-999.250
-999.250
2.061
-999.250
-999.250
-999.250
1.594
-999.250
-999.250
-999.250
1.634
-999.250
-999.250
-999.250
2.598
-999.250
-999.250
-999.250
4.137
-999.250
-999.250
-999.250
MNEMONIC
66BU
DRLIO
NCNb
6LSU
DRHO
NCNb
66Bu
DRHU
NCNb
LLSU
ORHu
NCNb
bLBU
DRHO
NCNb
6680
DRHU
NCNb
bbBU
DRHO
NCNb
6680
NCNb
66BU
DRHO
NCNb
6680
DRHU
NCNb
66BU
DRHU
NCNb
VAbU~
~.2bb
-999.260
-999.250
5.508
-999.d50
-999.250
9.055
-999.250
-9~9.250
3.830
-999.250
-999.250
5.184
-999.250
-999.250
3.70b
-999.250
-999.250
1.849
-999.250
-999.250
1.225
-999.250
-999.250
1.299
-999.250
-999.25U
1.7o3
-999.250
-999.250
3.525
-999.250
-999.250
9700. 000
96O0. 000
9500.000
q 400. 000
930O. O00
9200.000
91 O0. 000
9000. 000
8900.000
8800.000
8700.000
MNisMUN lC
SP
G~
NPH1
,BP
NPH.]
i. CNL
8P
G~
NPHI
t'CNL
6P
NPH i
8P
GR
SF
GP
NPHI
FCNL
NI-'H1
['CNL
SP
GR
~CNL
~P
GP
NPHI
~.CNL
8P
NPHI
FCNL
VAL
UE
-43.3 85.1
-999.2-999.2
75
88
50
50
-48.000 78.813
-999.250-999.250
-42 9~
-999-999
-41 9]
-999-999
-39
104
-999
-999
-37.
105.
-999.
-999.
-41.
107.
-999.
-999.
-47.
101.
-999.
-999.
-50.
173.
-999.
-999.
-45.
163.
-999.
-999.
-45.
177.
-999·
-999.
.25(.)
.375
.250
.250
.025
.563
.250
.250
.406
.125
.250
.250
75
25
50
50
50
88
50
50
94
75
50
50
25
50
50
50
O0
50
5O
50
50
50
50
50
ILD
G~
GR
1LO
Gk
BHUB
1 LD
ILD
GR
}{HOB
GR
ILD
GR
GR
ILD
RHOB
OR
ILD
GR
RHUB
ILD
GR
RHOB
ILD
GR
RHOB
ILD
RHOB
GR
1LD
GP
RHOB
GR
VALU
-999.
-999.
-999,
.
-999.
-999.
-999.
·
-999.
-999.
-999.
.
-999.
-999.
-999.
I .
-999.
-999.
-999.
·
-999.
-999.
-999.
I ·
-999.
-999.
-999.
.
-999.
-999.
-999.
0
-999.
-999.
-999.
0
-999.
-999.
-999.
o
-999.
-999.
-999.
059
25O
250
250
998
25O
25O
25O
512
250
250
250
308
250
250
250
264
25O
25O
250
500
250
250
25O
460
250
25O
250
990
25O
250
25O
414
25O
250
25O
486
250
250
250
262
250
250
25O
MNkMUN lC
CALl
NRA'i
D1
IbM
CALl
NRA7
UT
CALk
NRA'I
Df
CALl
NRAI
ibm
CALl
NRAf
DT
CALl
1LM
CALl
N~AT
CALl
NRAI
uT
ILM
CALl
NRAI
DT
CALl
N R A 1
ILM
CALl
NRA~I
uT
VALUL
3.111
-999.250
-999.250
-999.250
3.018
-999.250
-999.250
-999.250
1.558
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
1.341
-999.250
-999.250
-999.250
1.571
-999.250
-999.250
-999.250
1.502
-999.250
-999.250
-999.250
2.984
-999.250
-999.250
-999.250
4.734
-999.250
-999.250
-999.250
2.525
-999.250
-999.250
-999.250
4.129
-999.250
-999.250
-999.250
MNEMUNIC
i.,hSU
DRHU
NCNb
bLeU
DRHO
NCNb
bhSU
DRHU
NCNb
LLeU
DRHU
NCNb
LLSU
DRHU
NCNb
LLSU
DRHU
NCNb
bbSU
DRHU
NCN6
bhSU
DRHO
NCNb
bL8U
DRHU
NCNb
bleu
DRHU
NCNb
DRHU
VA6Uk
2.492
-999.250
-9~9·250
2.J05
-999.250
-999.250
1.127
-999.250
-999.250
1.029
-999.250
-999.250
1.063
-999.250
-999.250
1.221
-999.250
-999.250
1.110
-999.250
-999.250
2.213
-999.250
-999.250
4.031
-999.250
-999.250
1.100
-999.250
-999.250
2.980
-999.250
-999.250
DLP1 H
0800. 000
IO700.000
10h00o000
10500.o00
10~00.000
10:~00.000
10700.000
10100,000
10000.000
9900.000
9800.000
MN
LblUN 1C
SP
Git
NPHi
PCNL
SP
{JR
N PH 1
bCNb
6P
NPH I
FCNL
SP
NPHI
~CNL
bP
NPHI
FCNL
SP
NPHI
~CNL
~P
GR
NPNI
FCNL
SF
Gh
NPHI
8P
GR
FCNL
8P
NPHI
~CNL,
SP
NFH I
F CNh
VALUE
-10.313
10b.4S8
~2.129
~96.000
-28.315
109.750
-999.250
-999.250
-2b.875
128.000
-999.250
-999.250
-22.625
124.875
-999.250
-999.250
-28.375 93.188
-999.250-999.250
-31.750
105.813
-999.250
-999.250
-35.000 86.750
-999.250-999.25o
-31.750
113.750
-999.250
-999.250
-]2.]75
119.000
-999.250
-999.250
-]3.375
105.250
-999.250
-999.250
-39.875 8J.250
-999.250-999.250
MN
EMUN1C
lCD
RHUB
RHUB
GR
lCD
GR
RHOB
G~
lCD
RHUB
lCD
lCD
GR
ILD
RHOB
GE
GE
ILD
RHOB
GR
GR
VA6
I
97
2
91
1
-999
-999
-999
1
-999
:999
999
1
-99g
-999
-999
2
-999
-999
-999
2
-999
-999
-999
2
-999
-999
-999
-999
-999
-999
1
-999
-999
-999
!
-999
-999
-999
2
-999
-999
-999
tie
.520
.000
.514
.438
.727
.250
.250
.250
.723
.250
25O
'250
.416
.250
.250
.250
.779
.250
.250
.250
.559
.250
.250
.250
.725
.250
.250
.250
.497
.250
.250
.250
.467
.250
.250
.250
.655
.250
.250
.250
.604
.250
.250
.250
MN
LMON 1C
IbM
CALl
N IR A T
DI'
IBM
CALl
NRA*I
DT
IbM
CALl
DT
CALl
NRAT
CALl
NRA1
ILM
CALl
NRAT
PT
CALI
NRA1
PT
IbM
CALl
NRA/
{31
ibm
CALl
NRAI
{31
IbM
CALl
NRAT
iBM
CALI
NRA~I
VAbOk
1.585
10.898
3.346
101./50
1.845
-999.250
-999.250
-999.250
1.818
-999.250
-999.250
-999.250
1.451
-999.250
-999.250
-999.250
2.861
-999.250
-999.250
-999.250
2.014
-999.250
-999.250
-999.250
2.793
-999.250
-999,250
-999.250
1.558
-999,250
-999.250
-999.250
1.541
-999.250
-999.250
-999.250
1.112
-999.250
-999.250
-999.250
2.645
-999.250
-999,250
-999.250
MNEMONIC
66BU
DRHU
NCNb
6hBO
DRHU
NCNb
bBBU
DRHO
NCNb
6bBO
DRHU
NCN6
6680
DRHO
NCNB
66BU
DRHU
NCNb
6680
DRHU
NCNb
6bBO
DRHU
NCNb
hhBO
DRHO
NCNb
bbBO
ORHU
NCNb
6680
NCNb
VAbU~
2.939
0.000
1850.O00
2.055
-999.250
-999.250
1.131
-9~9.250
-999.250
1.320
-999.250
-999.250
2.510
-999.250
-99~.250
2.033
-999.250
-999.250
2.199
-999.250
-999.250
1.325
-999.250
-999.250
1.313
-999.250
-999.2b0
1.449
-999.250
-999.250
2.053
-999.250
-999.250
1 I 80~. 000
11 ~00. 000
1 ! 700.000
1)600.000
11500.000
11~00.000
1 I 300. 000
112OO.000
11100.000
11000.000
10900.000
MN
l~tqtJ N lC
SP
GP,
NPH 1
8P
NPHI
b CNIJ
,SP
Gk
6P
NPHI
FCNt.
GR
NPHI
SP
G~
NPHI
? C Nb
GR
NPH1
$P
NPHI
t' C N b
GP
NPHI
i. CNI,
8P
NPHI
F CNI,
8P
NPH1
['CNb
VAL
-3O
114
761
114
29
/bi
-29
109
21
790
-80
18
1211
-bO
64
21
1251
-111
17
20
lo29
-107
20
16
1948
-14
20
8
2954
-95
2]
21
1321
-~t
lb9
4
4200
-7]
51
22
1197
.875
.31~
.398
.500
,2~4
,513
.500
.125
.625
.539
,500
.563
.65b
.799
.000
.250
,438
,924
,000
.406
.020
.000
.06~
.391
,064
,000
.b25
,922
.691
.000
.000
.281
.045
.000
.344
.125
.541
.000
.25u
.188
.55q
.000
MN
bMONIC
ILD
RHUB
GR
lied
GR
RHUB
bP,
ILD
GR
RMUB
GR
I LD
GA
1LD
GA
GE
1LD
GR
RH(JB
Gl.<
ILD
GR
GR
RHDB
ILD
GE
GR
ILD
~HOB
GP
RHUB
OR
VAL
2
110
2
101
2
110
2
101
104
2
108
40
2
44
64
2
57
2
16
2
14
UL
.965
.438
.420
.938
.965
.438
.481
.938
.654
.625
.559
.813
.0]9
.375
.438
.625
.965
.750
.541
.56t
.605
.484
.268
.125
34.250
19.]59
2.~09
17.516
40
26
21
29
lq
2
2i
64
152
2
163
15
48
2
46
.063
.422
.480
.125
.125
.766
.246
.250
.000
.875
.578
.125
.680
.063
.29]
.75O
NNLMUNiC
CALl
NRA'I
UT
ILM
CALl
NBAT
bl
CALl
NRAI
UT
ILN
CALl
NRAI
Ib~
CALl
NI~AI
DT
IBM
CALl
NRAI
CALl
N RA'I
ILM
CALl
NRAT
UT
CALl
NRA ['
ibm
CALl
NRAI
DT
ibm
CALl
NRA~
UT
VAbUL
2.912
2.689
2.87'/
90.563
2.918
6.506
2,877
90.56~
3.768
9.188
2.910
85.750
3.266
8.547
2.275
89.375
4.277
~.578
2.486
79.750
2.959
8.422
2.]46
89.750
25.703
8.516
2.086
88.000
29.797
8.633
1
72.56]
20.375
8.641
2.434
95.150
61.031
9.875
1.424
57.188
8.977
2.501
93.000
MNNMUNIC
bbSO
DRHU
NCNb
bbSO
NCNb
bhSO
DRHO
NCNb
bbSO
DRHU
NCNb
bbSO
DRHU
NCNb
bhSO
DRHU
NCNb
bb8U
DRHU
NCNb
bbBO
DRHU
NCNb
bbBU
DRHO
NCNb
bbSU
DRHU
NCNb
DRHU
NCNb
~.000
0.011
2294.000
3.982
0.045
2294.000
5,398
0.066
2390,000
9.781
0.020
]064.000
10.172
0.035
3182.000
11.047
0,003
]94B.000
44,7Ul
0,003
4360.000
90.563
0.00O
4936.000
36.8~4
0.005
3380.000
274.250
-0.017
b108.000
zl.7~
0.006
317o.000
DAqU~ 6PkCIflCATIUN ~k, iJC~,5:
I;IA~41~. IUtJL UNI'f hPI AP1 AP1 APl [;1Lb SIZE SAM HI, It' PROCESS INDICATLiRS
USk,R DkFINI:D OUIPUT AIeRA~f
OUTPUT 8P Al 2
UUTPU r I LD Al zt
OUYPt~T I b~ a'l 4
OOIPUT LLSU A'[ 5
OUTPUT Gh A~ 7
O~TPUT CALl AT ~
OUTPUT DRHU AT 9
OUTPt;'[' NPHI A'I 10
UU~PUI ktlUB AT 11
UUTPIIT NPA'I A~ 12
UUTPIJT NCNb AI' lJ
OU ~Pi~T ~CNL Al 1~
OU'r['UT (;~ A~ 15
OUTPUT PT A'I 16
DAIA ['tI~NA.I. bPI".CJI"ICAIIIJN
LflIRY BLUCk.S:
0
IR L 1-' CODL
0
l~l~ VEH~IUh ~5.HO1 1~/03/26
5CHDUMBEI4GLi< COMPUTING
10707,61010
1-', P_, L h HEADER
PALL: 80/10/
FAPL MEADbP
LENGIIq: 132 OYTF,$
I'APE NAME: 61.030 UAl'E: 80/101 b
SLRV ICL NAM?.: EDIT
TAPE CONTINUATION NUMDkh: 01
PRLVIOU5 ~APL NAME:
COMMENI'S: UN LOUL WELL iDLNTI~tCAI~ION NUMBER i6 50-0Z9-20497
TA~L COMMENTS
CSNG DHILL~B 9.629~47 D~/~I'I' SIZE ~.5/~LUID GEL-P[JL~/D~NS 9.5/
VISC ]5/PH 9/~LUID bSS 5.8 MI/~M8 3.52~68 DF/RMC 2./4062 D~/
F 1EL MLADER
B ILL NAME: LDII .001
MAXIMUM PHYSICAL RLCUHD LENGTH: 1024 BYIE$
FRLVIUU5 FILL NAME:
~ lbL COMMENTS
bL-Btl FROM BUTTUM ()~ HULk UP TO 107bO, AND SF'LU TtJ ~OP O~ HOLE
COME'ANY : St) HlO AhASKA PL'lle(}.
WLLi, : J- 13
Flkbll : PRUDHUL ~A~
HANGL : 13L
TOWNSH IF : 1 I N
6LC I'tUN : 9
COUNTY : N. 8b{~Pk,
SI'ATk~ : ALASKA
DLNStFY : 800.
11 000000 7777777777
11 000000 7777777777
1111 00 00 77
1111 O0 O0 77
11 O0 0000 77
11 O0 0000 77
11 O0 O0 00 77
11 O0 O0 O0 77
11 0000 O0 77
11 0000 00 77
11 O0 00 77
11 O0 O0 77
111111 000000 77
llllll 000000 77
000000
000000
O0 O0
oO OO
O0 OOO0
00 0000
O0 O0 O0
o0 OO O0
0000 O0
0000 O0
O0 O0
O0 O0
o00000
000000
7777777777
777777t777
77
77
77
77
77
77
77
77
77
77
~7
77
b06066 11 000000
660666 11 000000
6o 1111 O0 O0
66 1111 O0 O0
66 11 O0 0000
66 11 O0 0000
ObbbbOb~ 1.1 O0 O0 O0
666bbbb6 11 O0 O0 O0
66 66 1l 0000 O0
66 66 11 O00O 00
66 66 11 00 O0
66 66 11 O0 O0
bbbbb6 llllll O0000O
6066~6 111111 000000
333333
333333
33 33
33 33
33
33
33
33
33
33
33 33
33 33
333333
333333
000000
000000
00 00
00 00
00 0000
O0 0000
00 00 00
00 00 00
0000 00
00OO O0
00 00
00 00
000000
000000
SSSS
S
S
SSS
S
S
SSSS
~~ 1., PPPP RRRR U U DDDD
F b P P R ~ U U D D
F I, P P ~ R U U D D
~ I., - .... PPPP RRRR U O D D
~ L P R ~ O U D D
F L P ~ ~ U O O D
~ LLLLL P R ~ UUUUtJ DDDD
H H O 0 E
H B UOO ~EEEE
qSTART*
*STARt *
MON l 'rt)R
USER PCAb [10707,b1030] dro6 SHiP
bwS KLIOE40 8EP-80. *SIAl-if* _
UShR PCAI, [10701,61030] dUB
8w8 1',1,101:,40 SEP-SO. ,STAIeT*
SHiP SEQ.
7666 DATE 07-uC1'-80
7666 DA'£h 07-UCT-80
17:24:44
17:24:44
Illl
IIII
11
Ii
I1
II
1I
11
1i
i1
II
iii1
11
II
II
II
PPPPPPPP
PPPPPPPP
PP PP
PP PP
PP PP
PPPPPPPP
PPPP~PPP
PP
PP
PP
PP
T~T1
TTT!
rTTT ] '1 UUUUUU
'1 T 1"i '1 'l UiItltjlJl.I
TT (J(j U(J
I T tJ[~
3'[' oEJ
]', ]', {J[j
I'T [JO
I'T Ob
'I T U(J bO
TI' rio Df.J
'1 T LIU L,ILJ
T [' (]0 (}{J
I'T UlJ L}LJ(J{J
I'T {_)OOOI.}ll
*STARI* USER PCAL [10701,b1030J dob SHiP SEO. 76{)6 DAT~ 07-UCT-80
MLJNJFIJR SwS KLlOh40 SEP-80. *START*
~lbk: DS~HISHIP 1(J<255>[10707 010301 CRhAIED: 06-UCT-80 03101:33
~RINTE6: 07-(~CT-UO 1~:25:0b
/6PACING:I /DIMIT:135 /FORMS:NURMA5
17:24:44
PC'CC
'.['HANKS
SttIPP]NG I NSTF'UCllONfi
15SUED t~-OCT-80 ¢)3: 01
!~ SE 1~ PCC'C
111III
1iiii1
II
1!
1I
11
I1
I1
ii
1I
1111II
Illiii
000000 OUO000 ~4 44
000000 OUO()O0 q4 44
O0 O0 O0 O0 44 44
O0 O0 O0 O0 44 44
00 uO00 00 0000 44 44
00 0000 O0 0000 q4 44
O0 O0 OO 00 OO O0 4q444444
O0 OD O0 ~0 O0 O0 ~4444~44
0000 OO 000~ O0 44
0000 O0 0000 o0 44
O0 O0 O0 O0 44
O0 O0 O0 O0 44
000000 0o0000 44
000000 000000 44
44
44
,$IARI, USER PCA6 [10701,b1030] dub SHiP bEO.
PH1N'rED: 07 IIC3 80 17:25:15
/SPACING:I /blMlr:l ~5 /~ORMS:NORMAL
7666 PAIL 07-UCT-80
07-UC 1~-80 17:18:13
17:24:44
4:4: 41:4c 4:~4~4: 4:4:4:4:4:~ 4:~4:4: 4: 4:4: 4:4: 4: 4: 4: 4:4:4:4:
ALASKA COlilPUTING CENTER
CO#PANY NAME : BP EXPLORATION
WELL NAME : J-~-l! CZZ-03-11-13)
FIELO NAME : PRUDHOE BAY
80ROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 50-029-20497
REFERENCE NO : 73871
LIS TAPE VERIFICATION LISTING
SCHLUMBERGER ALASKA COMPUTING CENTER
29-MAY-1990 13:12
**** REEL HEADER
SERVICE NA#E : EDIT
DATE : 90/05/29
ORIGIN : FLIC
REEL NAME : 73871
CONTINUATION ~ :
PREVIOUS REEL
COMMENT :BPt PRUDHOE BAY~ J-13 (22-03-11-13)~ AP! ~50-029-20497
~,~ TAPE HEADER **~
SERVICE NAME : EDIT
DATE : 90/05/29
ORIGIN : FLIC
TAPE NAME : 73871
CONTINUATION t : 1
PREVIOUS TAPE :
COMMENT :BPt PRUDHOE BAY, J-13 C22-03-11-13), API ~50-029-20497
~ FILE HEADER
FILE NAME : EDIT o001
SERVICE : FLIC
VERSION : 001A04
DATE : 90/05/29
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
PAGE:
SCHLUMBERGER gELL SERVICES
COMPANY NAME: BP EXPLORATION
#ELL: J-13 (22-03-11-13)
FIELD: PRUDHOE BAY
BOROUGH: NORTH SLOPE
STATE: ALASKA
API NUMBER: 50-029-20497
LOCATION: 1048e SNL & 804" gEL
SECTION: 9 TOWNSHIP:* 11N
RANGE: 13E
PERMANENT DATUM: MSL ELEVATION: 0
LIS TAPE VERIFICATION LISTING
SCHLUMBERGER ALASKA CO#PUTING CENTER
29-.MAY-1990 13:12
LOG MEASURED FROM KB 65 ABOVE PERMANENT DATUH
ELEVATIONS KB: 65 DF: 64 GL: 37-7
DATE LOGGED:
RUN NUMBER:
TO DRILLER:
TO LOGGER:
1T-MAY-1990
1
11704
11702
CASING 1:
CASING 2:
TUBING:
TAILPIPE:
5/8" 47 LB a DRILLER DEPTH OF 0 TO 10780
29 LB a DRILLER DEPTH OF 10265 TO 11795
26 LB a DRILLER DEPTH OF 0 TO 10226
1/2= 12o6 LB ~ DRILLER DEPTH OF 10226 TO 10333
BIT SIZE 1: 12 1/4'
BIT SIZE 2: 8 1/2N
TYPE FLUID IN HOLE: PRODUCED FLUIDS
TIME LOGGER ON BOTTOM: 09:30 17-HAY
LOGGING DISTRICT: 4615
LOGGING ENGINEER: JOHNSON
#ITNESS: HHITLO~
TOOL NUMBERS:
CNC-DA-101
CAL-UB-299
ATC-CB-1152
ATH-AA-374
FIELD REMARKS:
TIED INTO BHCS DATEO 9/28/80
HELL SHUT IN AT 0100 5/17/90
SIHHP= 2450 PSIG
RAN A 2.5= CNT ON LIMESTONE MATRIX
DATE JOB STARTEO: 26-MAY-90
JOB REFERENCE NO: 73871
LOP/AHA: KOHRING
PAGE:
FILE - EDIToO01
BP EXPLORATION
PRUDHOE BAY
J-13 (22-03-11-13)
50-029-20497
DATA SAHPLEO EVERY -o5000 FEET
LIS TAPE VERIFICATION LISTING
SCHLUMBERGER ALASKA COMPUTING CENTER
Z9-MAY-1990 13:12
PAGE:
DATA INCLUDED -
TOOL EXTENSION TOOL
TYPE USED NAME
NPHI.HLA HODGES-LEYMANN AVERAGED NPH!
CNT-A/D/H .PS1 COMPENSATED NEUTRON
CNT-A/D/H .P$2 COMPENSATED NEUTRON
CNT-A/O/H oPS3 COMPENSATEO NEUTRON
CNT-A/O/H oPS4 COMPENSATEO NEUTRON
11699t TO 10794t
11699~ TO 10794*
11699e TO 10T93e
11699~ TO 10T80~
11699~ TO 10T95~
TABLE TYPE : CONS
TUNI VALU DEFI
CN BP EXPLORATION COMPANY NAME
FN P RUDHOE BAY
WN ,I-13 C22-03-11-13)
APIN 50-029-,?.0497
FL 1048e SNL & 804e gEL
SECT 9
TOHN 11N
RANG 13E
COUN NORTH SLOPE
STAT ALASKA
NATI USA
I/ITN MHITL01/
SON 350061
PDAT MSL
EPO FT 0 o
LMF KB
APD FT 65.
EKB FT 65 o
EOF FT 64°
EGL FT 37°7
TOD FT 11704°
BLI FT 116990
TL! FT 10800.
TLAB 09:30 1T-NAY
FI ELD NAME
NELL NAME
API SERIAL NUMBER
FIELD LOCATION
SECTION
TOHNSHIP
RANGE
COUNTY
STATE OR PROVINCE
NATION
gXTNES~e NAME
SERVICE ORDER NUMBER
PERMANENT OATUM
LOG MEASURED FROM
BOTTOM LOG INTERVAL
TOP LOG INTERVAL
TIME LOGGER AT BOTTOM
TABLE TYPE : CURV
DEFX
DEPT DEPTH CHANNEL NAME
NPHZ NEUTRON POROSITY
NPHX NEUTRON POROSITY
TNRA CALIBRATED THERMAL NEUTRON RATIO
LIS TAPE VERIFICATION LISTING 29-1qa1'-1990 13.'12
SCHLUMBERGER ALASKA COMPUTING CENTER
DEFI
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
GR GAMMA RaY
TENS TENSION
CCL CCL AMPLITUOE
NPH! NEUTRON POROSITY
TNRA CALIBRATEO THERMAL NEUTRON RATIO
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
GR GAMMA RAY
TENS TENSION
CCL COL AMPLITUOE
NPH! NEUTRON POROSITY
TNRA CALIBRATED THERMAL NEUTRON RATIO
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
GR GAMMA RAY
TENS TENSION
CCL CCL AMPLITUOE
NPH! NEUTRON POROSITY
TNRA CALZBRATEO THERMAL NEUTRON RATIO
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
GR GAPINA RAY
TENS TENSION
CCL CCL AMPLITUDE
PAGE:
DATA
FORMAT SPECIFICATION RECORD
SET TYPE - 64EB ~
TYPE REPR CODE VALUE
I 66 0
2 66 0
3 73 152
4 66 1
5 66
6 73
· 65
8 68 0o5
LIS TAPE VERIFICATZON LISTING
SCHLUMgERGER ALASKA CONPUTZNG CENTER
29-MAY-1990 13:12
PAGE:
TYPE
REPR CODE VALUE
9 65 FT
11 66 6
12 68
13 66 0
14 65 FT
15 66 68
16 66 !
0 66 0
· ~ SET TYPE - CNAN ~
NAME SERV UNIT SERVZCE AP! AP! APX AP! FILE NUMB NUMB SZZE REPR PROCESS
ID ORDER e LOG TYPE CLASS NOD NUMB SAMP ELEM CODE CHEX)
TENS PSZ LB 350061 41
CCL PSZ V 350061 42
NPH! PS3 PU 350061
TNRA PS3 350061 42
RCNT PS3 CPS 350061 ,Z
RCFT PS3 CPS 350061 ,2
CNTC PS3 CPS 350061 42
CFTC PS3 CPS 350061 42
OR PS3 OAP[ 350061 42
TENS PS3 LB 350061
CCL PS3 V 350061
NPH! PS, PU 350061
TNRA PS, 350061
000 O0 0 I I I 4 68 0000000000
000 O0 0 I I I 4 68 0000000000
890 O0 0 1 I I ¢ 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 Ol 0 1 1 I ~ 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 O00OO00000
310 01 0 I I I 4 68 0000000000
635 21 0 I 1 I 4 68 0000000000
150 01 0 1 I I 4 68 0000000000
890 O0 0 I I I 4 68 0000000000
420 O! 0 I I I 4 68 0000000000
420 '01 0 I I I ¢ 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
310 01 0 I I I 4 68 0000000000
635 21 0 I I I 4 68 0000000000
150 01 0 I I I 4 68 0000000000
890 O0 0 I I I 4 68 O000OO0000
420 01 0 I I I ~ 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 O1 0 I I 1 4 68 0000000000
310 01 0 I I I 4 68 0000000000
635 21 0 I I I 4 68 0000000000
150 01 0 I I I 4 68 0000000000
890 O0 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 01 0 I I I 4 68 0000000000
420 Ol 0 1 1 I 4 68 0000000'000
310 01 0 I I I ~ 68 0000000000
635 21 0 I I I 4 68 0000000000
LIS TAPE VERIFICATION LISTING 29-NAY-1990 13:12
SCHLUMBERGER ALASKA COHPUTING CENTER
NAME SERV UNIT SERVICE AP! AP! API AP! FILE NU#B NURB SIZE REPR PROCESS
ID ORDER ~t LOG TYPE CLASS HOD NUNB SANP ELEH CODE CHEX)
CCL PS~ V 350061 42 150 01 0 I I I 4 68 0000000000
PAGE:
DATA
DEPT. 11726.500 NPHI.HLA 24.561 NPHIoPS1 -999.250 TNRA.PS1
RCNT.PS1 -999.250 RCFT.PS1 -999.250 CNTC.PS1 -999.250 CFTC.PS1
GR.PS1 -999.250 TENS.PS1 -999.250 CCL.PS1 -999.250 NPHIoPS2
TNRAoP52 -999.250 RCNT.PS2 -999.250 RCFToPS2 -999.250 CNTC.PSZ
CFTC.PS2 -999.250 GR.PSZ -999.250 TENS.PS2 -999.250 CCL. PS2
NPHZ.PS3 -999.250 TNRA.PS3 -999.250 RCNT. P$3 -999.250 RCFToPS3
CNTC.PS3 -999.250 CFTC.PS3 -999.250 GR.PS3 -999-250 TENS.PS3
CCL.PS3 -999.250 NPHI.PS4 -9990250 TNRAoPS~ -999.250 RCNT.PS~
RCFToPS~ -999.250 CNTC.PS4 -999.250 CFTC.PS~ -9990250 GR.PS~
TENS.PS4 -999.250 CCL.PS4 -999.250
DEPT. 11700.000 NPHI.HLA 31.055 NPHI.PS1 32.99~ TNRA.PS1
RCNT.PS1 2A5~.79~ RCFT.PS1 ~61o395 CHTC.PS1 25~3.0A8 CFTCoPS1
GR.PS1 38.781 TENS.PS1 1280.000 CCL.P$1 0.000 NPHI.PS2
TNRA.PS2 5.753 RCNT.P$2 2500.465 RCFToPS2 409.506 CNTC.P$2
CFTC.PS2 443.340 GRoPS2 31.781 TENS.PS2 1305.000 CCL.PSZ
NPHZ.PS3 30.660 TNRA.PS3 5.572 RCNT.PS3 2454.545 RCFT.PS3
CNTC.PS3 2495.109 CFTC.PS3 446.253 GR.PS3 38.438 TENSoPS3
CCLoPS3 0.000 NPHI.PS4 28.33~ TNRA.PS4 5.305 RCNToPS~
RCFT.PS~ 462.874 CNTC.PS4 2561.880 CFTC.PS4 4780495 GR.PS~
TENS.PS& 1325.000 CCL.PS& 0o000
DEPT. 11600.000 NPHZoHLA 2A.316 NPHI.PS1 23.456 TNRA. PS1
RCNT.P$1 3214.88& RCFT. P$1 7280625 CHTC.PS1 3341.404 CFTCoPS1
GR.PS1 32.969 TENS.PS1 1255.000 CCL. P$1 0.000 NPHI.PS2
TNRA.PSZ ~.910 RCNT.PSZ 32420424 RCFT. PSZ 684.651 C#TC.PSZ
CFTC.PS2 674.28~ GR.P$2 40.625 TENS.PSI I245.000 CCL.PS2
NPHI.PS3 23.048 TNRAoP$3 ~.677 RCNT.PS3 3181.818 RCFT.PS3
CNTC.PS3 3298.183 CFTC.PS3 703.055 GR. PS3 32.000 TENS.PS3
CCL.PS3 0.000 NPHI.PS~ 25.913 TNRA.PSA 5.022 RCNT.PS~
RCFT. PS~ 696.970 CNTC.P$4 3392o10~ CFTC.PS~ 671.325 OR.PS4
TENS.P$~ 1325.000 CCL.PS~ 0.000
DEPT. 11500.000 NPHI.HLA 25.391 NPHI.PS1 25.240 TNRA.PS1
RCNT.PS1 3332.023 RCFT.PS1 672.673 CNTC.PS1 34340283 CFTC.PS1
GR.P$1 35.031 TEN$.P~I 1295.000 CCL.PS1 0.000 NPHZ.PS2
TNRA.PS2 5.035 RCNT.PaZ 33630636 RCFT. P$Z 699.535 CNTCoPSZ
CFTC.PSI 684.175 GR.PS2 41.938 TENSoP$Z 1290.000 CCLoP$2
NPHZ.P$3 25.452 TNRA.PS3 4.967 RCNT.PS3 3214.88~ RCFT.PS3
CNTC.PS3 3423.565 CFTC.PS3 684.800 GR.PS3 37.969 TENS.PS3
CCL.PS3 0.000 NPHI.PS4 24.979 TNRAoPS4 4.910 RCNT.PS~
RCFT.PS~ 681.818 CNTC.PS4 3465.648 CFTC.PS~ 697.509 GR.P$~
TENS.P$~ 1310.000 CCL.PS4 0.000
-999.250
-999.250
-9990250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
5.830
438.280
32.305
2528.TZ0
00000
446.512
1285.000
2422.812
41.84¢
4.727
701.324
24~.973
3331.977
0.000
727.273
1240.000
3270.97~
4,3.000
4.942
687.335
26.022
3466.874
0.000
713.755
1270.000
3393.939
37.656
LIS T~.PE VERIFICATION LISTING
SCHLUMBERGER ALASKA COMPUTING CENTER
DEPT. 11400.000 NPHZ.HLA
RCNT.P$Z 3597.587 RCFT.PS1
GR.P$1 16.094 TENS.PS1
TNRA.PSZ 40638 RCNToPS2
CFTC.PS2 817.647 GR.PS2
NPHXoPS3 14.369 TNRA.PS3
CNTCoP$3 3797.199 CFTC.PS3
CCL.PS3 0o000 NPHX.PS4
RCFT.PS4 833.173 CNTC.P$4
TENS.PS4 1355.000 CCL.PS4
DEPT. 11300°000 NPHZ.HLA
RCNT.P$1 4432.220 RCFT.PS1
GR.PS1 23.391 TENS.PS1
TNRA.PS2 4.043 RCNT.PS2
CFTCoPSZ 1177.171 GR.PS2
NPHZoP$3 17.944 TNRAoP$3
CNTC.PS3 4902.279 CFTCoPS3
CCL.PS3 00000 NPHZ.PS4
RCFT.PS4 1095.468 CNTC.PS4
TENS.PS4 1350.000 CCL.PS4
DEPT. 11200.000 NPHZ.HLA
RCNToP$1 4306.483 RCFT.PS1
GR.PS1 ZT.T03 TENSoPS1
TNRAoPSZ 4.121 RCNT.PS2
CFTC.P$Z 1255.219 GR.PSZ
NPHZ.P$3 20.016 TNRA. PS3
CNTC.PS3 4945.730 CFTC.PS3
CCL.PS3 0.000 NPHX.PS4
RCFT.PS4 1196.970 CNTC.PS4
TENS.PS4 11500000 CCL.P$4
DEPT. 11100.000 NPHZ.HLA
RCNT.PS1 4562.438 RCFT.PS1
GR.PS1 15.422 TENS.PS1
TNRA.PS2 4.816 RCNT.PS2
CFTC.PS2 984.336 GR.PS2
NPH/.PS3 26.182 TNRAoPS3
CNTC.PS3 4646.171 CFTC.PS3
CCL.PS3 0.000 NPHZ.PS4
RCFT.PS4 1033.751 CNTC.P$4
TENS.PS4 1265.000 CCL.PS4
DEPT. 11000.000 NPHZ.HLA
RCNT.P$1 5Z16.451 RCFToPS1
GR.PS1 90.375 TENS.PS1
TNRA.PSZ 30132 RCNT.PS2
CFTC.PSZ 1768.480 GR.PSZ
NPHXoP$3 11.573 TNRA.P$3
CNTC.PS3 5551.484 CFTC.PS3
CCL.PS3 0.000 NPHZ.PS4
RCFT.PS4 1728.062 CNTC.PS4
TENS.PS4 1290.000 CCL.PS4
29-#AY-1990 13:12
22.803 NPHZ.PS1
849.557 CNTC.PS1
1335.000 CCL.PS1
3610.415 RCFT.PS2
13.641 TENS.PS2
40837 RCNT. PS3
792.622 GR.PS3
22.754 TNRA.PS4
3805.795 CFTC.PS4
0.000
18.750 NPHZ.PS1
1100.197 CNTC.PSI
1290.000 CCL.PS1
4526.522 RCFToPS2
22. 813 TENS.PS2
4.034 RCNT.PS3
1161.795 GR.PS3
19.916 TNRA. PS4
4889.508 CFTC.PS4
0.000
19.481 NPHZoPS1
1210.216 CNTCoPS1
1190.000 CCL.PS1
42:60°260 RCFT.PSZ
17.219 TENS.PSZ
4.300 RCNT.PS3
1244.208 GR.PS3
20.389 TNRA.PS4
/1,985.180 CFTC.PS4
O.OO0
24.414 NPHZ.PS1
958.743 CNTC.PS1
1235.000 CCLoPS1
4.337.917 RCFT.PS2
180188 TENS.PS2
5.054 RCNT.PS3
934,.008 GR.PS3
22.391 TNRA.PS4
4667.649 CFTC.PS4
0.000
11.475 NPHZ.PS1
1681.729 CNTC.PS1
1250.000 CCL.P$1
5184.185 RCFT.P$2
90.875 TENS.PS2
30173 RCNT. PS3
1747-265 GRoPS3
110671 TNRA.PS4
5413.111 CFTC.PS4
00000
22.880
37830569
0.000
816.617
1260.000
3672.131
17.094
4.641
822.832
19.166
4784.953
0.000
1249.759
1295.000
4636.363
13.119
4*.287
1105.563
19.076
5002.898
0.000
124.2.871
1300.000
¢424.242
27.719
4.347
1296o096
24.946
4*643.305
0.000
1021.611
1270.000
43810870
180156
4*0596
1015.091
11.427
5641 °228
0o000
1699.115
1280.000
5338.4T6
80.063
3.187
1711.042
TNRa. PS].
CFTC-PS1
NPHX.PS2
CNTC. PS Z
CCL.P$2
RCFT.PS3
TENS.PS3
RCNT. PS4
GR. PS4
TNRA.PS1
CFTC.PS1
NPHX.PS2
CNTC.PS2
CCLoPS2
RCFT. PS3
TENS.PS3
RCNToPS4
GR.PS4
TNRA.PS1
CFTC.PS1
NPHX.PS2
CNTC.PSZ
CCLoPS2
RCFT.PS3
TENS.PS3
RCNT.PS4
GR.PS4
TNRA.PS1
CFTC.PS1
NPHI.PS2
CNTC.PSZ
CCL.PS2
RCFToPS3
TENS.PS3
RCNToPS4
TNRA.PS1
CFTC.PS1
NPHX.PSZ
CNTC.PS2
CCLoPSZ
RCFT.PS3
TENSoPS3
RCNToPS4
GR.PS4*
PAGE:
4°656
817.515
22.728
3818.685
0.000
771.456
1295.000
3548.698
17.625
4.192
1112.74.5
18,007
484.1.554
00000
1180.700
1300.000
¢84*8.4*84
25.234
4.180
1309.033
18.610
4769.036
0.000
1218.901
1255.000
4666.666
30.781
4..907
957.528
24.194
4654.201
0.000
956.606
1275.000
4424.24*2
20.188
3.153
17560951
11.180
5557.960
0.000
1712.633
1270.000
4*999.035
90.375
LIS TAPE VERIFICATION LISTING
SCHLUM6ERGER ALASKA COMPUTING CENTER
DEPT. 10900.000 NPHZ.HL&
RCNT.P$1 3897.839 RCFToPS1
GRoPS1 33.625 TENS.PS1
TNRA.PSZ 4.925 RCNT.PS2
CFTC.PS2 812.625 GR.PS2
NPHI.PS3 26.358 TNRA.P$3
CNTCoPS3 40030928 CFTC.PS3
CCLoPS3 0.000 NPHI.PS4
RCFT.PS~ 817.743 CNTC.PS4
TENS. PS4 1240.000 CCL.PS4
DEPT. 108000000 NPH! HLA
RCNT.PS1 2501.002 RCFT:PS1
OR.PS1 60.594 TENS.PS1
TNRAoPS2 6.622 RCNT.P$2
CFTC.PSI 379.782 GR.PSZ
NPHZoPS3 41.987 TNRAoPS3
CNTC.PS3 25610678 CFTC.PS3
CCL.PS3 O.O00 NPHIoPS4
RCFT.PS~ 339.768 CNTC.PS4
TENS.PS4 1225.000 CCLoPS4
DEPT. 107790000 NPHI.HL&
RCNToPS1 -999.250 RCFToPS1
GRoP$1 -999.250 TENS.PS1
T~RA.PS2 -999.250 RCHToPS2
CFTC.PSI -999.250 GRoPS2
NPHI.PS3 -999.250 TNRAoPS3
CNTC.PS3 -999.250 CFTC PS3
CCL.PS3 -999.250 NPHI~PS4
RCFToPS~ -999.250 CNTCoPS4
TENS.PS~ -999.250 CCLoPS4
END OF OATA ~
ttt~ FILE
FILE NA#E
SERVICE
VERSION
DATE
MAX REC SIZE
FILE TYPE
LAST FILE
TRAILER ~*~*
: EDIT .001
: FLIC
: 001A04
: 90/05/29
: 1024
: LO
:
29-HAY-1990 13:12
26.270 NPHZ.PS1
769°539 CNTC.PS1
1245.000 CCL.PS1
3907.908 RCFToPS2
32.656 TEMS. PS2
5.074 RCNT.PS3
797.037 GR.PS3
26.026 TNRA. PS4
3942.793 CFTCoPS4
0.000
42.920 NPHIoPS1
400.400 CNTC. PS1
12100000 CCL. PS1
2466.466 RCFT.PS2
67.625 TENS.PS2
6.624 RCNT. PS3
386.064 GR. PS3
~40029 TNRA.PS4
2523.792 CFTC.PS4
0.000
0.000 NPHZ. PS1
-999.250 CNTC.PS1
-999.250 CCLoPS1
-999.250 RCFT.PS2
-999.250 TENS.PS2
-999.250 RC~tT.PS3
-999.250 GR.PS3
-999.250 TNRAoPS4
-999.250 CFTC.PS4
-999.250
27.875
3996.444
0o000
865.731
1255.000
3897.839
35.688
5.035
792.069
43°865
2554°784
0-000
368.737
12100000
2468.660
62.344
6.796
375.771
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999o250
-999.250
TNRA.PS1
CFTC.PS1
NPHZ.PS2
CNTC.PS2
CCL.PS2
RCFToPS3
TENS. PS3
RCNToPS~
GR.PS4
TNRA. PS1
CFTC.PS1
NPHIoPS2
CNTC.PSZ
CCL. PS2
RCFToPS3
TENS.PS3
RCNT.PS4
GR.PS4
TNRA.PS1
CFTC.PS1
NPHI. PS2
CNTCoPS2
CCLoPS2
RCFT.PS3
TENS.PS3
RC#T.PS~
GR.PS&
PAGE:
5.252
775.785
25.102
4039.329
0.000
848.602
1235.000
3775.811
340313
6.781
374o629
41.953
2561.447
0.000
3540870
1245o000
23570563
62.344
-999.250
-999.250
-999.250
-999.250
-999.250
-999o250
-999.250
-999.250
-999.250
LIS TAPE VERIFICATION LISTING
SCHLUMBERGER ALASKA COMPUTING CENTER
29--MAY-1990 13:12
PAGE:
~ TAPE TRAILER ~
SERVICE NAHE : EDIT
DATE : 90/05/Z9
ORIGIN : FLIC
TAPE NAME : 73871
CONTINUATION t : 1
PREVIOUS TAPE :
COMMENT :BPt PRUDHOE BaT, d-13 ¢22-03-11-13), API #S0-029-20497
· *~ REEL TRAILER
SERVICE NAME : EDIT
DATE : 90/05/29
ORIGIN : FLIC
REEL NAME : 73871
CONTINUATION ~ :
PREVIOUS REEL
COMMENT : BP, PRUDHDE BAYt J-13 C22-03-11-13)~ API #50-029-20497
J- 13 ~ ~
PRUDHOE B/~Y %~ ~'~ ~
/'\ /\
WESTERN
ATLAS
Atlas Wireline Services
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
J- 13 (22-03-11-13)
500292049700
BP EXPLORATION (ALASKA)
ATLAS WIRELINE SERVICES
08-JUL-94
1187.02
L. KOENN
R. MAYS
INC.
9
liN
13E
650
804
69.07
64.00
37.70
OPEN HOLE
BIT SIZE (IN)
CASING
SIZE (IN)
9.625
7.000
7.000
4.500
DRILLERS
DEPTH (FT)
10780.0
11795.0
10226.0
10333.0
CASING
WEIGHT
47.00
29.00
26.00
12.60
(LB/FT)
CURVE SHIFT DATA - ALL PASSES TO STANDARD
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BHCS
GR
2
1
07-SEP-80
SWS
BASELINE DEPTH
10867.5
10868.5
10869.0
10887.0
10887.5
10919.0
10920.0
10932.0
10944.0
10949.0
10956.5
10961.5
GRCH
10866.0
10867.0
10868.0
10886.0
10887.0
10918.5
10919.0
10931.0
10943.5
10948.5
10955.5
10960.5
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
10975.0
10985.0
10986.0
10987.0
10987.5
10989.0
10990.0
10990.5
10991.0
10992.5
10993.5
11003.0
11004.0
11007.5
11008.0
11009.5
11012.5
11031.0
11038.5
11039.5
11048.5
11049.0
11067.0
11068.5
11069.5
11078.0
11121.5
11127.0
11128.0
11142.0
11351.5
11359.0
11364.0
11371.5
11372.0
$
REMARKS:
10974.5
10984.5
10985.0
10986.0
10987.0
10988.5
10989.0
10989.5
10990.5
10992.0
10992.5
11002.0
11003.5
11007.0
11008.0
11009.5
11011.5
11030.0
11040.0
11041.0
11049.0
11050.0
11067.0
11068.5
11069.0
11077.5
11119.5
11125.0
11125.5
11139.5
11351.5
11359.0
11363.5
11371.0
11371.5
CN/GR Cased Hole.
LOG TIED TO SONIC DATED 28-SEP-80.
CN LOGGING PARMS:
LIMESTONE MATRIX
CHISM OFF
CALIPER CORRECTION = 10.625
CASING CORRECTIONS OFF
SALINITY = 0 PPM
SHIFT PROCEDURE AS FOLLOWS:
1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE
GAMMA RAY.
2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED"
FIRST PASS GAMMA RAY.
3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS NEUTRON.
/ ? ?MATCH1A . OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each run
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10830.0
10842.0
BASELINE DEPTH NPHI
10825.0 10825.0
10866.0 10865.5
10874.0 10873.0
10926.0 10924.5
10945.0 10944.5
10949.5 10949.0
10985.5 10987.5
10986.5 10988.5
10987.5 10989.0
10988.5 10989.5
10990.0 10991.0
11008.5 11009.0
11012.0 11011.0
11014.5 11013.5
11015.0 11014.5
11016.5 11016.0
11030.0 11027.5
11047.5 11046.0
11048.5 11047.0
11067.5 11067.0
11068.0 11067.5
11071.5 11070.5
11078.0 11077.0
11130.5 11128.0
11133.5 11131.0
11134.5 11131.5
11135.5 11132.5
11351.5 11351.5
11359.0 11359.0
11364.0 11363.5
11371.5 11371.0
11372.0 11371.5
$
STOP DEPTH
11439.0
11447.0
(MEASURED DEPTH)
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
PASS 1.
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
in separate files.
/ ? ?MATCH lB. OUT
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI 4
2 NPHI 2418 68 1 PU-L 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
5 TENS 2418 68 1 LB 4
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 31
Tape File Start Depth = 11457.000000
Tape File End Depth = 10825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7591 datums
Tape Subfile: 2 214 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH GRCH
10837.5
10847.0
10861.5
10867.5 10867.0
10876.0
10877.0
10884.5
10885.0 10884.5
10885.5 10885.5
10886.0 10886.5
10886.5 10887.0
10887.5 10887.5
10888.5 10888.5
10889.0 10889.5
10889.5 10890.0
10896.0
10910.5
10918.0 10918.0
10919.0 10918.5
10919.5 10919.5
10920.0 10920.0
10921.0 10920.5
10931.5
10932.0 10931.5
10933.5 10934.5
10935.0 10936.0
10936.0 10936.5
10937.0 10937.5
10942.5
10943.5 10943.0
10944.0 10943.5
10944.5 10944.5
10949.5
10955.5
10958.5
10964.0
10967.0
START DEPTH STOP DEPTH
10833.0 11439.0
10845.0 11447.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
NPHI
10840.0
10849.5
10861.5
10876.0
10876.5
10884.0
10884.5
10896.0
10910.0
10921.0
10930.5
10942.5
10949.5
10956.0
10960.0
10965.5
10968.5
10968.0
10969.0
10969.5
10980.5
10986.5
10987.0
10987.5
10988.0
10989.5
10994.0
10996.5
10997.0
10997.5
10998.5
11003.0
11003.5
11004.0
11008.5
11010.5
11011.0
11012.0
11013.0
11014.0
11023.0
11024.0
11025.5
11026.5
11027.5
11029.0
11029.5
11030.0
11031.0
11032.0
11034.5
11035.0
11040.5
11042.5
11048.0
11055.5
11059.5
11067.0
11068.0
11072.5
11078.0
11079.0
11080.0
11080.5
11083.0
11084.0
11084.5
11086.0
11087.0
11088.0
11089.0
11090.0
11091.5
11092.5
11116.0
11117.0
11117.5
10986.5
10987.0
11002.5
11003.5
11010.5
11011.5
11030.5
11036.0
11041.5
11056.0
11067.5
11068.0
11078.0
10969.0
10970.0
10971.0
10983.0
10989.5
10990.0
10991.5
10995.5
10998.0
10999.0
10999.5
11000.0
11004.5
11005.0
11009.5
11011.5
11012.5
11013.0
11013.5
11022.5
11023.0
11024.5
11025.0
11026.0
11026.5
11027.0
11028.0
11030.0
11033.5
11041.5
11047.5
11059.0
11071.5
11078.0
11080.0
11080.5
11082.5
11083.5
11084.5
11086.0
11086.5
11087.5
11088.0
11088.5
11090.0
11090.5
11113.5
11114.5
11115.5
11120.0
11120.5
11121.5
11134.5
11135.5
11138.0
11138.5
11139.5
11140.0
11140.5
11141.0
11141.5
11146.5
11169.0
11178.0
11179.5
11180.5
11183.5
11198.0
11207.0
11208.0
11236.5
11257.0
11258.5
11259.0
11259.5
11260.0
11269.0
11282.0
11284.0
11287.5
11288.0
11289.0
11289.5
11290.5
11291.0
11292.5
11293.5
11294.5
11301.5
11307.5
11312.5
11316.5
11329.0
11333.0
11338.5
11341.0
11341.5
11342.0
11343.0
11345.0
11351.0
11352.0
11372.5
11376.0
11376.5
11397.5
11398.0
11420.0
11420.5
11118.5
11119.0
11119.5
11136.0
11138.0
11138.5
11139.5
11196.5
11206.5
11313.5
11317.5
11329.5
11351.5
11352.0
11372.5
11375.0
11375.5
11397.0
11397.5
11420.0
11420.5
11132.5
11133.0
11136.0
11136.5
11137.5
11144.0
11167.0
11176.0
11177.0
11177.5
11181.5
11205.0
11235.5
11256.0
11258.0
11258.5
11259.0
11259.5
11268.5
11281.0
11283.0
11288.5
11289.0
11289.5
11290.0
11290.5
11291.5
11293.0
11293.5
11294.5
11303.0
11307.0
11333.0
11338.0
11340.5
11341.5
11342.0
11342.5
11344.5
11421.0
11428.0
11428.5
11429.0
11431.0
11433.5
11441.5
11442.5
11443.0
11445.0
11445.5
$
REMARKS:
11421.5
11428.5
11429.0
11429.5
11431.5
11433.5
11442.5
11443.0
11441.5
11445.0
11445.5
PASS 2.
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
/ ? ?MATCH2A. OUT
/ ??MATCH2B. OUT
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI 4
2 NPHI 2418 68 1 PU-L 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
5 TENS 2418 68 1 LB 4
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 31
Tape File Start Depth = 11457.000000
Tape File End Depth = 10825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7591 datums
Tape Subfile: 3 233 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10833.0
10845.0
BASELINE DEPTH
GRCH
10837.5
10847.0
10855.0 10854.5
10861.0
10872.0
10872.5
10873.5
10874.5
10888.5 10888.0
10892.5
10918.5 10917.5
10919.0 10918.0
10920.0 10919.5
10925.5
10926.0
10926.5
10930.0
10930.5
10931.0
10932.5 10932.0
10941.5
10943.0 10943.0
10948.0
10948.5
10953.5
10956.0
10957.0
10979.5
10980.0
10987.0 10987.0
10988.0 10987.5
10989.5
10991.5 10991.0
10992.0
10993.0 10992.0
11000.5 11000.5
11008.0 11008.0
STOP DEPTH
11439.0
11447.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
NPHI
10840.0
10849.5
10861.0
10872.0
10873.0
10874.0
10874.5
10892.5
10924.0
10924.5
10925.5
10929.0
10930.0
10930.5
10941.5
10948.0
10949.0
10954.0
10957.0
10958.0
10981.0
10982.0
10991.5
10993.5
10994.0
11008.5
11010.0
11010.5
11011.0
11012.0
11013.0
11014.0
11015.0
11024.0
11025.0
11027.0
11028.0
11029.5
11032.0
11037.5
11039.0
11039.5
11040.0
11040.5
11047.5
11052.0
11053.0
11054.0
11058.5
11064.5
11066.5
11070.5
11076.5
11077.0
11078.5
11082.5
11084.5
11085.5
11088.0
11089.0
11117.0
11118.0
11118.5
11125.0
11126.5
11127.5
11133.0
11136.5
11137.0
11137.5
11141.0
11144.0
11146.0
11147.0
11150.5
11156.5
11157.0
11160.5
11161.5
11162.5
11166.0
11170.5
11171.5
11172.0
11178.0
11009.0
11010.5
11011.0
11013.0
11013.5
11031.5
11040.0
11041.0
11066.5
11078.5
11123.5
11125.0
11125.5
11134.5
11135.5
11136.0
11138.5
11141.5
11148.5
11155.5
11156.0
11160.0
11009.5
11011.0
11012.5
11013.0
11014.0
11014.5
11023.5
11024.0
11026.0
11026.5
11027.5
11035.5
11038.0
11039.0
11047.5
11052.0
11052.5
11053.5
11058.5
11064.5
11070.0
11076.0
11077.0
11078.5
11083.0
11085.0
11085.5
11088.0
11088.5
11116.5
11117.0
11117.5
11130.5
11143.5
11144.0
11158.5
11160.5
11164.5
11169.0
11169.5
11170.5
11176.5
11178.5
11179.5
11184.5
11187.5
11206.0
11207.0
11237.0
11237.5
11254.5
11255.0
11256.0
11257.5
11266.5
11284.0
11284.5
11316.0
11340.5
11341.0
11341.5
11343.5
11344.0
11351.0
11351.5
11352.5
11354.5
11355.0
11356.0
11357.0
11357.5
11365.5
11372.5
11415.5
11416.0
11418.0
11430.5
11433.5
11441.5
11442.5
11443.0
11445.0
11445.5
$
REMARKS:
11282.5
11318.0
11352.0
11352.5
11353.0
11355.0
11356.0
11357.0
11357.5
11358.0
11365.5
11372.5
11417.5
11418.0
11418.5
11431.0
11433.5
11442.5
11443.0
PASS 3.
FUCT, NUCT,
11177.5
11178.5
11182.0
11185.0
11204.0
11205.0
11237.0
11237.5
11254.0
11254.5
11255.0
11256.5
11266.0
11283.5
11284.5
11340.5
11341.0
11341.5
11343.5
11344.5
11441.5
11445.0
11445.5
& TENS WERE SHIFTED WITH NPHI.
/ ? ?MATCH3A . OUT
/ ??MATCH3B. OUT
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI 4
2 NPHI 2418 68 1 PU-L 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
5 TENS 2418 68 1 LB 4
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 31
Tape File Start Depth = 11457.000000
Tape File End Depth = 10825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 15182 datums
Tape Subfile: 4 203 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: 0.5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
GRCH
2418
$
REMARKS:
1, 2, 3
1, 2, 3
AVERAGED PASS.
GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3
PASSES.
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH CNAV 68 1 GAPI 4
2 NPHI CNAV 68 1 PU-L 4
3 FUCT CNAV 68 1 CPS 4
4 NUCT CNAV 68 1 CPS 4
4 35 725 65 1
4 35 725 65 1
4 35 725 65 1
4 35 725 65 1
16
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 26
Tape File Start Depth = 11457.000000
Tape File End Depth = 10825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 13917 datums
Tape Subfile: 5 49 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10825.0
2418 10837.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11441.5
11450.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
0.00
10.625
23-JUN-94
FSYS REV. J001 VER. 1.1
1708 23-JUN-94
11650.0
11453.0
10850.0
11450.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323NA
0.000
11795.0
0.0
PRODUCED FLUIDS
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN) :
0.0
REMARKS: PASS 1.
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-L 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TTEN 2418 68 1 LB 4
9 TEN 2418 68 1 LB 4
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
4 31 402 87 0
4 31 402 87 0
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 101
Tape File Start Depth = 11450.000000
Tape File End Depth = 10825.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 40193 datums
Tape Subfile: 6
Minimum record length:
Maximum record length:
176 records...
46 bytes
1006 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10832.0
2418 10840.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11441.5
11450.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
0.00
10.625
23-JUN-94
FSYS REV. J001 VER. 1.1
1752 23-JUN-94
11650.0
11453.0
10850.0
11450.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323NA
0.000
11795.0
0.0
PRODUCED FLUIDS
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN) :
0.0
REMARKS: PASS 2.
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-L 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TTEN 2418 68 1 LB 4
9 TEN 2418 68 1 LB 4
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
4 31 402 87 0
4 31 402 87 0
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 99
Tape File Start Depth = 11450.000000
Tape File End Depth = 10832.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 38648 datums
Tape Subfile: 7
Minimum record length:
Maximum record length:
174 records...
62 bytes
1006 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10832.0
2418 10840.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM
GR
CN
CCL
$
PULSE CODE MODULATOR
GAMMA RAY
COMPENSATED NEUTRON
CASING COLLAR LOC.
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
STOP DEPTH
11441.5
11450.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
0.00
10.625
23-JUN-94
FSYS REV. JO01 VER. 1.1
1837 23-JUN-94
11650.0
11453.0
10850.0
11450.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323NA
0.O00
11795.0
0.0
PRODUCED FLUIDS
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN) :
0.0
REMARKS: PASS 3.
$
CN : BP EXPLORATION
WN : J - 13
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-L 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TTEN 2418 68 1 LB 4
9 TEN 2418 68 1 LB 4
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
4 31 402 87 0
4 31 402 87 0
36
* DATA RECORD (TYPE# O) 1006 BYTES *
Total Data Records: 99
Tape File Start Depth = 11450.000000
Tape File End Depth = 10832.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 64924 datums
Tape Subfile: 8
Minimum record length:
Maximum record length:
174 records...
62 bytes
1006 bytes
Tape Subfile 9 is type: LIS
01
**** REEL TRAILER ****
94/ 7/11
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 11 JLY 94 11:32a
Elapsed execution time = 7.64 seconds.
SYSTEM RETURN CODE = 0
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER .......
RECEIVED
JUL ~ 1%99B
Alaska Oil & Gas Cons. Commission
Anchorage
COMPANY NAME : BP EXPLORATION
WELL NAME : J- 13
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292049700
REFERENCE NO : 98371
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
**** REEL HEADER ****
SERVICE NA~E : EDIT
DATE : 98/07/21
ORIGIN : FLIC
REEL NAME : 98371
CONTINUATION # :
PREVIOUS REEL :
COM~fEN~f · BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/07/21
ORIGIN : FLIC
TAPE NAME : 98371
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: J-13
API NUMBER: 500292049700
OPERATOR: BP EXPLORATION
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 21-JUL-98
JOB NUMBER: 98371
LOGGING ENGINEER: J. SPENCER
OPERATOR WITNESS: M. KISSINGER
SURFACE LOCATION
SECTI ON: 9
TOWNSHIP: 1 iN
RANGE: 13E
FNL: 650
FSL.
FEL: 804
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 69.10
DERRICK FLOOR:
GROUND LEVEL: 37.70
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
..............................................
1ST STRING 8. 500 7. 000
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN ArGMBF~ :
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
88888.0
11318.5
11292.0
11267.0
11231.0
11201.5
11190.5
11177.0
11172.5
11172.0
11148.5
11144.0
11136.0
11128.5
11125.5
11123.5
11116.0
11073.0
11071.5
11069.0
11053.0
11036.0
11035 5
11025 0
11020 5
11017 5
11003 5
10995 0
10981.5
10977.0
10975.0
10966.0
10960.5
10957.5
10943.0
10925.5
10924.0
10880.5
10875.5
10873.0
1O855.0
10832.5
10813.0
100.0
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
88889.5 88889.5
11320.0 11320.0
11292.0 11292.0
11266.0 11266.0
11233.0 11233.0
11203.5 11203.5
11193.0 11193.0
11179.5
11175.5
11175.5
11151.5 11151.5
11146.0 11146.0
11137.5 11137.5
11131.0 11131.0
11128.0 11128.0
11126.0 11126.0
11116.5 11116.5
11073.0
11069.0
11053.0
11035.0
11026.0
11022.0
11018.5
11004.0
10996.0
10982.5
10978.0
10975.0
10967.0
10962.0
10958.5
10944.0
10926.5
10881.5
10877.0
10874.5
10855.0
10834.0
10815.0
102.0
11073.0
11069.0
11053.0
11035.0
11026.0
11022.0
11018.5
11004.0
10996.0
10982.5
10978.0
10975.0
10967.0
10962.0
10958.5
10944.0
10926.5
10881.5
10877.0
10874.5
10855.0
10834.0
10815.0
102.0
PAGE:
LIS Tape Verification L~st~ng
Schlumberger Alaska Computlng Center
24-JUL-1998 15:13
CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON
BP EXPLORATION WELL J-13 ON 8-APR-98. THE DEPTH SHIFTS
SHOWN ABOVE REFLECT CNTD PASS #1 GRCH TO THE BASELINE
GAM~A RAY PROVIDED BY THE CLIENT (GR.BCS) ; AND CNTD
PASS #1 NPHI TO GR.BCS. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
$
PAGE:
**** FILE HEADER ****
FILE NA~E : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE · 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth sh~fted and cl~pped curves for each pass ~n separate f~les.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 11323.0 10808.0
CNTD 11347.0 10808.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
..............
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
REF~%RKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED
TO THIS DATA.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX)
DEPT FT 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTD PU-S 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNTD 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTD 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNTD CPS 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTD GAPI 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTD LB 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTD V 1187892 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 11348. 500 NPHI. CNTD 32. 389 NRAT. CNTD 5. 019 CRAT. CNTD
NCNT. CNTD 3160. 896 FCNT. CNTD 629. 726 CFTC. CNTD 622. 905 CNTC. CNTD
GRCH. CNTD -999. 250 TENS. CNTD 1662. 000 CCL. CNTD O . 000
DEPT. 10810.000 NPHI. CNTD 46.221 NRAT CNTD 5.903 CRAT. CNTD
NCNT. CNTD 1890.836 FCNT. CNTD 320.320 CFTC. CNTD 316.851 CNTC. CNTD
GRCH. CNTD 60.037 TENS. CNTD 1543.000 CCL.CNTD 0.000
5.330
3331.432
6. 891
1968. 948
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth sh~fted and cl~pped curves for each pass ~n separate f~les.
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 11323 0 10754.0
CNTD 11347.0 10754.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH GRCH CNTD
............................
88888.0 88889.5 88890.0
11333.0 11335.0
11324 0 11326.0
11318.5 11320.0
11315.5 11316.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
11309.0 11311.0
11302.0 11302.0
11279.5 11280.5
11266.5 11265.5
11259.5 11259.0
11260.0
11259.0
11246.0 11247.5
11242.0 11242.0
11235.0 11236.5
11234.0 11236.0
11231.0 11233.0
11220.5 11223.5
11218.5 11220.5
11210.5 11213.0
11203.0 11205.5
11201.0 11203.5
11193.5 11196.0
11183.5 11187.0
11172.0 11175.5
11171.0 11174.5
11159.5 11163.5
11150.5 11153.5
11145.5 11148.5
11143.5 11146.0
11135.5 11138.0
11132.5 11134.5
11128.5 11132.0
11128.0 11132.0
11123.5 11125.5
11116.0 11116.5
11072.5 11073.0
11071.5 11073.0
11065.5 11065.5
11060.0 11060.0
11048.5 11048.5
11036.0 11035.0
11035.0 11035.0
11025.0 11026.0
11017.5 11019.0
11006.0 11006.5
11005.5 11006.5
11003.5 11004.5
10996.5 10997.5
10992.0 10993.0
10990.5 10992.5
10985.0 10986.0
10982.0 10983.0
10976.5 10978.0
10975.0 10975.5
10969.0 10969.0
10968.5 10969.5
10962.5 10964.5
10961.5 10962.0
10957.5 10958.5
10957.0 10957.0
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
10949.0 10950.5
10943.0 10944.5
10942.0 10943.0
10933.0 10934.0
10925.5 10926.5
10923.5 10927.0
10919.5 10921.0
10901.0 10901.5
10888.0 10889.0
10882.0 10883.5
10880.5 10881.5
10873.0 10874.5
10869.5 10871.0
10866.0 10866.0
10862.0 10863.0
10859.0 10859.0
10853.0 10853.0
10846.5 10847.0
10832.0 10834.5
10829.5 10830.0
10818.0 10819.5
100.0 101.5 100.5
$
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT
CNTD PASS #2 GRCH TO CNTD PASS #1 GRCH; AND CNTD PASS
#2 NPHI TO CNTD PASS #1 NPHI. ALL OTHER CNTD CURVES
WERE CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE.
TYPE REPR CODE VALUE
..............................
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAM~ SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTD PU-S 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNTD 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNTD 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
NCNT CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
FCNTCNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNTD CPS 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CNTD GAPI 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CNTD LB 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNTD V 1187892 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 11349.000 NPHI.CNTD 28.751 NRAT. CNTD 4.759 CRAT CNTD
NCNT. CNTD 3049.197 FCNT. CNTD 640.674 CFTC. CNTD 633.735 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1645.000 CCL.CNTD 0.000
DEPT. 10754.500 NPHI.CNTD 50.750 NRAT. CNTD 6.752 CRAT. CNTD
NCNT. CNTD 1854.584 FCNT. CNTD 274.678 CFTC. CNTD 271.703 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1552.000 CCL.CNTD 0.000
4.892
3292 834
7.410
2036. 966
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
**** FILE HEADER ****
FILE NAFIE : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11323.0 10802.0
CNTD 11347.0 10802.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
88888.0
11338.5
11325.5
11318.5
11313.0
11308.0
11301.5
11292.5
11278.5
11260.0
11251.0
11239.5
11235.5
11230.0
11221.0
11210.5
11203.0
11201.5
11193.5
11190.5
11187.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
88889.5 88889.0
11339.5
11326.5
11320.0
11292.0
11203.5
11193.0
11313.5
11308.0
11302.0
11279.5
11260.0
11251.5
11241.0
11236.5
11233.0
11223.0
11213.0
11206.0
11196 0
11194.0
11190.0
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 10
11172.5 11175.5
11171.5 11175.0
11149.0 11151.5
11145.5 11148.5
11143.5 11146.0
11133.5 11136.0
11129.0 11131.5
11128.0 11131.5
11125.0 11128.0
11122.5 11125.0
11116.0 11116.5
11114.5 11115.5
11092.0 11093.5
11078.5 11080.5
11073.0 11073.0
11071.5 11073.0
11060.0 11060.0
11041.5 11042.0
11036.0 11035.0
11035.5 11035.0
11025.0 11026.0
11018.0 11019.5
11006.0 11006.5
10996.5 10997.5
10992.0 10993 0
10985.0 10986.0
10983.0 10984.0
10982.0 10983.0
10976.0 10978.0
10974.5 10975.0
10968.5 10969.5
10961.0 10962.5
10953.0 10953.5
10949.0 10950.0
10943.5 10944.5
10933.0 10934.5
10925.5 10926.5
10924.5 10927.0
10897.5 10901.0
10888.0 10889.0
10882.0 10883.5
10880.5 10882.0
10875.5 10877.0
10873.5 10874.5
10870.0 10871.5
10861.5 10863.0
10856.0 10855.0
10852.0 10853.0
10838.0 10840.0
10833.0 10834.5
10830.0 10830.5
10829.5 10832.0
10817.5 10820.0
10816.0 10817.5
100.0 101.5 100.5
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 11
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVEREFLECT
CNTD PASS #3 GRCH TO CNTD PASS #1GRCH; AND CNTD PASS
#3 NPHI TO CNTD PASS #1 NPHI. ALL OTHER CNTD CURVES
WERE CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 O.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
NPHI CNTD PU-S 1187892 O0 000 O0 0 3 I 1 4 68 0000000000
NRAT CNTD 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNTD 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNTD CPS 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNTD GAPI 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
TENS CNTD LB 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
CCL CNTD V 1187892 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 12
** DATA **
DEPT. 11348.000 NPHI.CNTD 30.471 NRAT. CNTD 4.856 CRAT. CNTD
NCNT. CNTD 3193.133 FCNT. CNTD 657.534 CFTC. CNTD 650.412 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1633.000 CCL. CNTD 0.000
DEPT. 10802.500 NPHI. CNTD 44.529 NRAT. CNTD 5.797 CRAT. CNTD
NCNT. CNTD 1990.349 FCNT. CNTD 343.348 CFTC. CNTD 339.629 CNTC. CNTD
GRCH. CNTD -999.250 TENS.CNTD 1527.000 CCL.CNTD 0.000
5.101
3359. 677
6. 698
2073.199
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCR~ENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
CNTD 1, 2, 3,
$
REMARKS: THE ARITHPIETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 13
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 40
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 25
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
.......................................................................................
DEPT FT 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI CNAV PU-S 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
NRAT CNAV 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
CRAT CNAV 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
NCNT CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
FCNTCNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC CNAV CPS 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH CNTD GAPI 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
TENS CNTD LB 1187892 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 11348.500 NPHI.CNAV -999.250 NRAT. CNAV -999 250 CRAT. CNAV
NCNT. CNAV -999.250 FCNToCNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH. CNTD -999.250 TENS.CNTD 1662.000
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 14
DEPT. 1081 O. 000 NPHI. CNAV 45. 672 NRAT. CNAV
NCNT. CNAV 1912. 269 FCNT. CNAV 316. 623 CFTC. CNAV
GRCH. CNTD 60. 037 TENS. CNTD 1543. 000
6. 040 CRAT. CNAV
313.193 CNTC. CNAV
6. 828
2023. 602
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last f~le
PASS NUMBER: 1
DEPTH INCR~ENT: O. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
CNTD 11360.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
..........
10807.5
08-APR-98
8C0-609
1626 08-APR-98
11655.0
0.0
10750.0
11351.0
1800.0
NO
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15.13
PAGE: 15
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAM~A RAY
CNTD COMP. NEUTRON
$
TOOL NUMBER
...........
CGRS-A
CNT- D
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN).
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
8.500
11795.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REF~ARKS: TIED INTO SWS BHCS DATED 9/28/80.
LOGGED ON SANDSTONE MATRIX.
DID NOT TAG TD.
SHUT IN WHP = 1900 PSI
WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING.
FIELD PICK GOC @ 11293' FID.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 16
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX)
O0 000 O0 0 5 1 1 4 68 0000000000
DEPT FT 1187892
NPHI PS1 PU 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
RTNR PS1 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
TNRA PS1 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
RCNTPS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
RCFT PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
CNTC PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC PS1 CPS 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS1 LB 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
CCL PS1 V 1187892 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 11360.000 NPHI.PS1 23.640 RTNR.PS1 4.000 TNRA.PS1
RCNT. PS1 4129.032 RCFT. PS1 1032.258 CNTC. PS1 4329.853 CFTC. PSI
GR.PS1 0.000 TENS.PSI 834.000 CCL.PS1 0.010
DEPT. 10807.000 NPHI.PS1 44.898 RTNR.PS1 6.235 TNRA.PS1
RCNT. PS1 1827.671 RCFT. PS1 293.130 CNTC. PS1 1968.948 CFTC. PSI
GR.PS1 62.784 TENS.PSi 1535.000 CCL.PS1 -999.250
4.240
1021.077
6.740
289.955
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 17
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass ~n separate f~les; raw background pass in last file
PASS NUMBER: 2
DEPTH INCR~ENT: 0.5000
FILE SO?4FzARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
11362.0 10752.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
08-APR-98
8C0-609
1626 08-APR-98
11655.0
0.0
10750.0
11351.0
1800.0
NO
TOOL NUMBER
...........
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 18
GR GAMMA RAY
CNTD COMP. NEUTRON
$
CGRS-A
CNT- D
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
8.500
11795.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) · 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
RE~RKS: TIED INTO SWS BHCS DATED 9/28/80.
LOGGED ON SANDSTONE MATRIX.
DID NOT TAG TD.
SHUT IN WHP = 1900 PSI
WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING.
FIELD PICK GOC @ 11293' MD.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2.
$
LIS FORMAT DATA
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE: 19
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
DEPT FT 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
NPHI PS2 PU 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
RTNR PS2 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
TNRA PS2 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
RCNTPS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
RCFT PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
CNTC PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
CFTC PS2 CPS 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS2 GAPI 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS2 V 1187892 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 11362.000 NPHI.PS2 23.640 RTNR.PS2 4.000 TNRA.PS2
RCNT. PS2 3764.706 RCFT. PS2 941.177 CNTC. PS2 3947.806 CFTC. PS2
GR.PS2 0.000 TENS. PS2 779.000 CCL. PS2 -0.019
DEPT. 10751.500 NPHI.PS2 48.195 RTNR.PS2 7.054 TNRA.PS2
RCNT. PS2 2021.750 RCFT. PS2 286.617 CNTC. PS2 2128.278 CFTC. PS2
GR.PS2 49.675 TENS. PS2 1468.000 CCL.PS2 -999.250
4.240
930. 982
7.117
283.513
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE. 20
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~BER 7
RAW CURVES
Curves and log header data for each pass ~n separate f~les; raw background pass ~n last f~le
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SU~FiARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
11362.5 10801 . 0
CNTD
LOG HEADER DATA
DATE LOGGED: 08-APR-98
SOFTWARE VERSION: 8C0- 609
TIME LOGGER ON BOTTOM: 1626 08-APR-98
TD DRILLER (FT) : 11655.0
TD LOGGER (FT) : O. 0
TOP LOG INTERVAL (FT): 10750.0
BOTTOM LOG INTERVAL (FT) : 11351.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
TOOL NUMBER
...........
LIS Tape Verlf~catxon L~st~ng
Schlumberger Alaska Computlng Center
24-JUL-1998 15:13
PAGE: 21
GR GAMMA RAY
CNTD COMP. ITEUTRON
$
CGRS-A
CNT-D
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) .
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
8.500
11795.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G) ..
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: TIED INTO SWS BHCS DATED 9/28/80.
LOGGED ON SANDSTONE MATRIX.
DID NOT TAG TD.
SHUT IN WHP = 1900 PSI
WELL WAS SHUT IN ABOUT 15 HRS BEFORE LOGGING.
FIELD PICK GOC ® 11293' FID.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3.
$
LIS FORMAT DATA
LIS Tape Verification L~st~ng
Schlumberger Alaska Computlng Center
24-JUL-1998 15:13
PAGE: 22
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
DEPT FT 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PS3 PU 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
RTNR PS3 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
TNRA PS3 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
RCNT PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
RCFT PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
CNTC PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
CFTC PS3 CPS 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
GR PS3 GAPI 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS3 LB 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
CCL PS3 V 1187892 O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 11362.500 NPHI.PS3 67259.000 RTNR.PS3 -999.250 TNRA.PS3
RCNT. PS3 3878.788 RCFT. PS3 0.000 CNTC. PS3 4067.437 CFTC. PS3
GR.PS3 0.000 TENS.PS3 821.000 CCL.PS3 0.010
DEPT. 10800.500 NPHI.PS3 45.487 RTNR.PS3 6.558 TNRA.PS3
RCNT. PS3 1990.349 RCFT. PS3 303.477 CNTC. PS3 2066.002 CFTC. PS3
GR.PS3 68.267 TENS.PS3 1484.000 CCL.PS3 -999.250
-1059.323
0.000
6.807
300.190
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
24-JUL-1998 15:13
PAGE:
23
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE . 98/07/21
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/07/21
ORIGIN : FLIC
TAPE NAME : 98371
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/07/21
ORIGIN : FLIC
REEL NAME : 98371
CONTINUATION # :
PREVIOUS REEL :
COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
* ALASKA COMPUTING CENTER *
.
******************************
. ............................ .
....... SCHLUMBERGER .......
. ............................ .
******************************
RECEiVeu
]99 '
COMPANY NAME : BP EXPLORATION
WELL NAME : J-13
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292049700
REFERENCE NO : 97195
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/05/20
ORIGIN · FLIC
REEL NAblE : 97195
CONTINUATION # :
PREVIOUS REEL :
COI~4~NT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
PAGE:
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/05/20
ORIGIN FLIC
TAPE NAME : 97195
CONTINUATION # 1
PREVIOUS TAPE :
COM~IENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: J-13
API NUMBER. 500292049700
OPERATOR: BP EXPLORATION
LOGGING COMPANY. SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 20-MAY-97
JOB NUMBER: 97195
LOGGING ENGINEER. S.DECKERT
OPERATOR WITNESS: K. BARDWELL
SURFACE LOCATION
SECTION: 9
TOWNSHIP: lin
RANGE: 13E
FNL: 650
FSL:
FEL: 804
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 65.00
DERRICK FLOOR: 64.00
GROUND LEVEL: 37.70
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
..............................................
9.625 10780.0 47.00
7.000 10226.0 26.00
7.000 11795.0 29.00
4.500 10333.0 12.60
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15.56
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED: 7-SEPT-80
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
.......... EQUIVALENT UNSHIFTED DEPTH ..........
BASELINE DEPTH GRCH NPHI
............................
88888.0 88889.5 88889.5
11411.5 11413.0 11413.0
11387.0 11388.0 11388.0
11366.0 11367.0 11367.0
11364.0 11365.5 11365.5
11360.5 11361.5 11361.5
11357.5 11359.0 11359.0
11356.0 11357.0 11357.0
11338.5 11340.0 11340.0
11317.0 11320.0 11320.0
11298.0 11301.0 11301.0
11262.0 11265.5 11265.5
11245.0 11248.5 11248.5
11228.5 11233.0 11233.0
11200.0 11203.0 11203.0
11189.5 11192.5 11192.5
11185.0 11189.0 11189.0
11175.0 11179.0 11179.0
11142.5 11146.0
11141.0 11146.0
11134.0 11137.0 11137.0
11127.0 11131.0 11131.0
11122.5 11126.0 11126.0
11101.5 11103.0 11103.0
11081.0 11082.5 11082.5
11071.5 11073.0 11073.0
11068 0 11069.0 11069.0
11052.0 11053.0 11053 0
11035.0 11035.0 11035.0
11023.5 11026.0 11026.0
11019 5 11022.0 11022.0
11016.0 11018.0 11018.0
11008.0 11010.0 11010.0
11002.5 11004.0 11004.0
10996.0 10998.0 10998.0
10994.0 10996.0 10996.0
10980.5 10982.5 10982.5
10976.5 10978.0 10978.0
10971.0 10972.5 10972.5
10967.0 10968.5 10968.5
10959.0 10962.0 10962.0
10956.0 10958.5 10958.5
10955.0 10956.5 10956.5
10944.0 10946.0 10946.0
10940.0 10942.0 10942.0
PAGE:
LIS Tape VerlfIcatlon Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15.56
10937.0 10939.0 10939.0
10936.0 10936.0 10936.0
10929.0 10929.5 10929.5
10924.0 10926.0 10926.0
10902.0 10905.5 10905.5
10901.0 10904.0 10904.0
10886.0 10888.0 10888.0
10877.0 10879.0 10879.0
10874.0 10877.0
10871.5 10874 0 10874.0
10865.5 10866.5
10865.0 10866.5
10857.5 10858.0 10858.0
10855.0 10855.0 10855.0
10838.5 10840.5 10840.5
10832.0 10834.0 10834.0
10824.0 10826.5 10826.5
10816.5 10819.0 10819.0
10812.5 10815 0 10815.0
10808.0 10811.0 10811 . 0
100.0 103.0 103.0
$
REMARKS:
CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON
BP EXPLORATION'S J-13 WELL. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #1 GRCH TO GR.BCS; AND PASS #1 NPHI
TO GR BCS. ALL OHTER CNTD CURVES WERE CARRIED WITH THE
NPHI SHIFT.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE 97/05/20
MAX REC SIZE · 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth sh~fted and clipped curves for each pass in separate f~les.
PASS NUMBER: 1
DEPTH INCRE~IENT: 0 5000
FILE SUMFIARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 11421.0 10795.0
CNTD 11445.0 10795.0
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
..............
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
REMARKS: THIS FILE CONTAINS CNTD PASS #1. THERE WERE NO PASS TO
PASS SHIFTS APPLIED TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
..............................
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 488059 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTD PU-L 488059 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNTD 488059 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTD 488059 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000
FCNTCNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELM CODE (HEX)
CFTC CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNTD CPS 488059 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTD GAPI 488059 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTD LB 488059 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTD V 488059 O0 000 O0 0 1 1 1 4 68 0000000000
.......................................................................................
** DATA **
DEPT. 11446.500 NPHI. CNTD 30.437 NRAT. CNTD 5.097 CRAT. CNTD
NCNT. CNTD 3174.935 FCNT. CNTD 607.843 CFTC. CNTD 591.001 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1335.000 CCL.CNTD 0.000
DEPT. 10798.000 NPHI CNTD 41.381 NRAT. CNTD 6.375 CRAT. CNTD
NCNT. CNTD 1958.429 FCNT. CNTD 301.531 CFTC. CNTD 314.746 CNTC. CNTD
GRCH. CNTD 53.031 TENS. CNTD 1380.000 CCL.CNTD 0.000
5.546
3287.768
6.579
2016.154
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate f~les
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
LIS Tape Verlflcatlon L~st~ng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11421.0 10798.0
CNTD 11445.0 10798.0
$
CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH GRCH CNTD
............................
88888.0 88889.5 88890.5
11440.5 11443.0
11437.0 11438.5
11418.0 11420.0
11409.5 11411.0
11409.0 11409.0
11402.5 11404.0
11401.0 11402.5
11385.5 11387.0
11384.5 11385.5
11371.5 11373.5
11366.5 11367.5
11366.0 11367.0
11360.5 11362.0
11356.0 11357 0
11355.5 11357.0
11352.0 11353.0
11349.0 11350.5
11346.0 11347.5
11337 5 11339.0
11323 0 11325.5
11316.5 11320.0
11309.0 11312.0
11305.5 11309.0
11301.5 11304.5
11298.5 11301.5
11296.5 11301.0
11292.5 11296.0
11279.0 11282.0
11270 0 11273.5
11258.0 11261.5
11245.0 11249.0
11229.5 11234.0
11215.0 11219.5
11210.0 11213.5
11202.0 11205.0
11200.0 11203.0
11182.5 11186.5
11178.0 11182.5
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15'56
PAGE.
11175.0 11178.5
11171.0 11175.5
11166.0 11170.0
11158.5 11163.5
11151.0 11156.0
11147.0 11152.5
11144.5 11149.0
11142.0 11146.0
11141.0 11146.0
11134.0 11137.5
11132.0 11135.5
11131.5 11135.0
11126.5 11131.0
11124.5 11128.5 11128.5
11123.0 11126.5
11122.5 11126.0
11118.0 11122.0
11115.5 11119.5
11110.5 11113 0
11109.0 11112.0
11105.5
11102.5
11094.5 11095.5
11072.0 11073.0
11071.5 11073.5
11068.0 11069.0
11065.5 11066 5
11059.5 11060.5
11052.5 11053.0
11035.5
11035.0
11034.5 11035.0
11023.5 11026.0
11024.0
11021.0
11019.5 11022.0
11017.0 11019.5
11016.0 11018.5
11005.0 11007.0
11002.5 11004.5
10996.5 10998.5
10996.0 10998.5
10993.5 10996.0
10991.0 10993.0
10989.0 10991.5
10983.5 10986.0
10982.0 10984.5
10980.5 10983.0
10976.0 10978 0
10973.0 10975.0
10971.0 10973.0
10968.0 10970 0
10967.0 10969.0
10966.5 10968.5
10964.0 10966.5
10962.0 10965.0
10960.0 10962.0
10955.5 10957 5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
10949.0 10951.0
10946.0 10948.0
10944.5 10946.5
10943.5 10946.0
10939.5 10942.5
10935.0 10936.0
10924.0 10926.0 10926.0
10919.0 10921.5
10918.0 10919.5
10907.5 10912.5
10905.0 10909.0
10903.5 10905.5
10899.0 10902.5
10895 0 10898.0
10894.0 10897.0
10889.0 10892.5
10886.0 10889.0
10881.5 10883.5
10876.0 10878.5
10872.0 10874.5
10870.0 10872.5
10864.5 10866.0 10866.0
10862.0 10863.5
10861.5 10863.0
10859.0 10859.5
10856.0 10858.0 10856.5
10854.5 10855.0
10838.5 10840.5 10840.5
10831.5 10834.0
10831.0 10834.0
10822.5 10824.5
10815.5 10818.0
10813.0 10816.5
10808.0 10813.5
10804.0 10807.5
100.0 102.5 103.5
$
REM_ARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #2 GRCH TO PASS #1GRCH; AND PASS #2
NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 488059 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTD PU-L 488059 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNTD 488059 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNTD 488059 O0 000 O0 0 2 1 1 4 68 0000000000
NCNT CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000
FCNT CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNTD CPS 488059 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CNTD GAPI 488059 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CNTD LB 488059 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNTD V 488059 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 11447.500 NPHI.CNTD 26 240 NRAT. CNTD 4.703 CRAT CNTD
NCNT. CNTD 3214.780 FCNT. CNTD 671.202 CFTC. CNTD 663.426 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1330 000 CCL.CNTD 0.000
DEPT 10800 500 NPHI.CNTD -999 250 NRAT. CNTD -999 250 CRAT CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC CNTD
GRCH. CNTD 57.313 TENS. CNTD -999.250 CCL.CNTD -999.250
5.060
3376.146
-999.250
-999.250
LIS Tape Verification L~Stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
10
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUMBER: 3
EDITED CURVES
Depth sh~fted and cl~pped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11421.0 10798.0
CNTD 11445.0 10798.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH GRCH CNTD
............................
88888.0 88887.5 88890.5
11440.5 11443.0
11433.5 11434.0
11430.0 11430.0
11427.0 11429.0
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15.56
PAGE:
11
11418.5
11414.5
11413.0
11410.5
11409.0
11403.0
11395.0
11390.0
11386 5
11385 0
11383 5
11377 0
11370 5
11367 0
11366.0
11365.5
11363.0
11361.0
11357.0
11356.0
11346.5
11338.0
11334.5
11325.5
11324 5
11317.0
11309.5
11307.0
11306.0
11298.5
11296.0
11293.5
11258.5
11245.5
11244.5
11237.5
11234.0
11229.5
11225.0
11219.0
11218.5
11215.5
11210.5
11210.0
11207.5
11202.5
11200.5
11196.5
11189.5
11186.0
11177.0
11167.0
11159.0
11150.5
11143.0
11418.0
11411.5
11403.5
11391.0
11385.5
11378.0
11367.0
11362.0
11357.5
11337.0
11327.5
11320.0
11309.0
11297.5
11261.5
11247.5
11239.5
11233.0
11229.0
11221.0
11213.5
11211.5
11203.0
11192.5
11179.5
11156.0
11146.0
11416.0
11414.0
11409.0
11396.0
11386.5
11384.0
11372.0
11367.5
11366.0
11364.0
11357.0
11347.5
11339.5
11325.5
11312.0
11310.0
11301.5
11296.0
11261.5
11249.0
11238.0
11221.0
11219.0
11213.5
11205.0
11199.0
11190.0
11180.5
11171.0
11163.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
12
11141.5
11139.5
11138.5
11134.0
11132.0
11125.0
11123.0
11115.0
11110.5
11110.0
11106.5
11104.5
11102.0
11083.0
11081.5
11072.0
11069.0
11068.5
11060.0
11057.5
11052.5
11052.0
11035.5
11035.0
11024.0
11022.5
11020.0
11017.5
11017.0
11013.5
11005.5
11003.0
10997.0
10996.5
10995.5
10993.5
10991.5
10989.0
10984.5
10981.0
10976.5
10973.5
10972.0
10970.0
10967.5
10962.0
10957.0
10956.5
10952 5
10949 5
10945 5
10942 5
10942 0
10939 5
10939.0
11137.0
11126.5
11103.5
11082.5
11073.0
11069.0
11053.0
11035.0
11026.0
11022.0
11018.5
11004.5
10998.5
10997.5
10996.0
10991.0
10983.0
10978.0
10973.5
10958.5
10944.0
10941.5
11146.0
11144.0
11143.0
11135.0
11128.5
11126.0
11116.0
11113.0
11111.5
11107.5
11105.5
11083.5
11073.5
11069.5
11061.0
11058.0
11052.5
11035.5
11024.5
11022.5
11019.5
11015.0
11007.0
10998.5
10993 5
10986 5
10975 0
10971.0
10968.5
10965.0
10957.5
10954.0
10950.5
10947.5
10944.5
10941.5
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
10935.5
10924.5
10918.0
10909.5
10909.0
10902.5
10899.5
10891 0
10889 0
10882 0
10879 5
10878 0
10875 0
10872 0
10870 5
10865 0
10864.5
10862.0
10859.0
10857.0
10853.0
10852.5
10848.5
10845.5
10839.0
10838.5
10831.0
10830.5
10825.5
10821.5
10817.5
10816.0
10812.0
10804.0
10802.5
10799.0
100.0
$
10936.0
10926.0
10919.5
10910.5
10906.0
10902.5
10891.0
10881.5
10880.0
10877.0
10874.5
10866.5
10863 5
10855.0
10840 5
10834.0
10826.5
10818.5
10815.0
10807 0
104.5
10926.5
10912.0
10892.5
10883.5
10872.5
10866.0
10859.5
10856.5
10853.5
10849.5
10845.0
10840.5
10832.5
10828.5
10821.5
10808.5
10804.0
105.0
REM_ARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3
NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
PAGE:
13
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 O.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
..............................
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX)
.......................................................................................
DEPT FT 488059 O0 000 O0 0 3 1 I 4 68 0000000000
NPHI CNTD PU-L 488059 O0 000 O0 0 3 1 1 4 68 0000000000
NRAT CNTD 488059 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNTD 488059 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNTD CPS 488059 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNTD GAPI 488059 O0 000 O0 0 3 1 1 4 68 0000000000
TENS CNTD LB 488059 O0 000 O0 0 3 1 1 4 68 0000000000
CCL CNTD V 488059 O0 000 O0 0 3 1 1 4 68 0000000000
14
** DATA **
DEPT. 11447. 500 NPHI CNTD 28. 419 NRAT. CNTD 5. 077 CRAT. CNTD
NCNT. CNTD 3150.259 FCNT. CNTD 646. 632 CFTC. CNTD 635. 748 CNTC. CNTD
GRCH. CNTD - 999. 250 TENS. CNTD 1505. 000 CCL. CNTD O . 000
DEPT. 10802.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH CNTD 55.406 TENS CNTD -999 250 CCL.CNTD -999.250
5.315
3406.595
-999 250
-999.250
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
15
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
1, 2, 3,
CNTD
REMARKS:
THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS FORMAT DATA
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
16
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 40
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 25
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
.......................................................................................
DEPT FT 488059 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI CNAV PU-L 488059 O0 000 O0 0 4 1 1 4 68 0000000000
NRAT CNAV 488059 O0 000 O0 0 4 1 1 4 68 0000000000
CRAT CNAV 488059 O0 000 O0 0 4 1 1 4 68 0000000000
NCNTCNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000
FCNTCNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC CNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC CNAV CPS 488059 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH CNTD GAPI 488059 O0 000 O0 0 4 1 1 4 68 0000000000
TENS CNTD LB 488059 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT 11446.500 NPHI. CNAV 29 176 NRAT. CNAV 5.057 CRAT. CNAV
NCNT CNAV 3178.222 FCNT. CNAV 639.365 CFTC. CNAV 619.534 CNTC. CNAV
GRCH CNTD -999.250 TENS. CNTD 1335.000
DEPT 10798.000 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV
NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH CNTD 53.031 TENS. CNTD 1380.000
5. 402
3336. 925
-999.250
- 999. 250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
17
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NI]MBER 5
RAW CURVES
Curves and log header data for each pass in separate fxles; raw background pass in last f~le
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
11454.5 10793.0
CNTD
LOG HEADER DATA
DATE LOGGED: 24 -APR- 97
SOFTWARE VERSION: CP 42.2
TIME LOGGER ON BOTTOM: 957 24-APR-97
TD DRILLER (FT) : 11650.0
TD LOGGER (FT) : O. 0
TOP LOG INTERVAL (FT) : 10800.0
BOTTOM LOG INTERVAL (FT) . 11447.0
LOGGING SPEED (FPHR): 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
....................................
GR GAM~A RAY CGRS 860
CCL COLLAR LOCATOR CPLC 831
CNTD COMP. NEUTRON CNTD 101
$
BOREHOLE AND CASING DATA
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
18
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
10780.0
BOREHOLE CONDITIONS
FLUID TYPE ..
FLUID DENSITY (LB/G):
SURFACE T~4PERATURE (DEGF) :
BOTTOM HOLE T~PERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG):
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
2.71
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS 9-28-80
LIMESTONE MATRIX
DID NOT TAG TD.
WELL SHUT IN ®0730 4-24-97.
SHUT IN WHP 1650.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
TYPE REPR CODE VALUE
..............................
1
4 66
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 488059 O0 000 O0 0 5 1 1 4
NPHI PS1 PU 488059 O0 000 O0 0 5 1 1 4
RTNR PS1 488059 O0 000 O0 0 5 1 1 4
TNRA PS1 488059 O0 000 O0 0 5 1 1 4
RCNTPS1 CPS 488059 O0 000 O0 0 5 1 1 4
RCFT PS1 CPS 488059 O0 000 O0 0 5 1 1 4
CNTC PS1 CPS 488059 O0 000 O0 0 5 1 1 4
CFTC PS1 CPS 488059 O0 000 O0 0 5 1 1 4
GR PS1 GAPI 488059 O0 000 O0 0 5 1 1 4
TENS PS1 LB 488059 O0 000 O0 0 5 1 1 4
CCL PS1 V 488059 O0 000 O0 0 5 1 1 4
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
PAGE: 19
** DATA **
DEPT 11454.500 NPHI.PS1 27.464 RTNR.PS1
RCNT. PS1 3053 003 RCFT. PS1 621.908 CNTC. PS1
GR.PS1 13.172 TENS. PSi 885.000 CCL.PS1
DEPT. 10793.000 NPHI.PS1 42.363 RTNR.PS1
RCNT. PS1 1995.381 RCFT. PS1 320.377 CNTC. PS1
GR.PS1 48.219 TENS. PSi 1375.000 CCL.PS1
4. 909 TNRA. PS1
3201 . 489 CFTC. PS1
O. 026
6.118 TNRA.PS1
2068.625 CFTC. PSi
0.000
5.204
615.172
6.652
314.868
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE. 20
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAFIE : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass in separate f~les; raw background pass in last f~le
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMFIARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
11458 0 10796.0
CNTD
LOG HEADER DATA
DATE LOGGED: 24 -APR- 97
SOFTWARE VERSION: CP 42.2
TIME LOGGER ON BOTTOM: 957 24-APR-97
TD DRILLER (FT) : 11650.0
TD LOGGER (FT) · O. 0
TOP LOG INTERVAL (FT) : 10800.0
BOTTOM LOG INTERVAL (FT) : 11447.0
LOGGING SPEED (FPHR). 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
GR GAM~L~ RAY CGRS 860
CCL COLLAR LOCATOR CPLC 831
CNTD COMP. NEUTRON CNTD 10I
$
BOREHOLE AND CASING DATA
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE.
21
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
10780.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
2.71
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS). 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS 9-28-80
LIMESTONE MATRIX
DID NOT TAG TD.
WELL SHUT IN @0730 4-24-97.
SHUT IN WHP 1650.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
LIS Tape Verification Listing
Schlumberger Alaska Computang Center
20-MAY-1997 15:56
PAGE:
22
TYPE REPR CODE VALUE
..............................
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
..............................
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
DEPT FT 488059 O0 000 O0 0 6 1 1 4 68 0000000000
NPHI PS2 PU 488059 O0 000 O0 0 6 1 1 4 68 0000000000
RTNR PS2 488059 O0 000 O0 0 6 1 1 4 68 0000000000
TNRA PS2 488059 O0 000 O0 0 6 1 1 4 68 0000000000
RCNTPS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000
RCFT PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000
CNTC PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000
CFTC PS2 CPS 488059 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS2 GAPI 488059 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 488059 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS2 V 488059 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 11458 000 NPHI. PS2 27.756 RTNR.PS2 4.941 TNRA.PS2
RCNT. PS2 3166.078 RCFT. PS2 640.754 CNTC. PS2 3320.063 CFTC PS2
GR.PS2 21.078 TENS.PS2 905.000 CCL.PS2 0.021
DEPT. 10796.000 NPHI.PS2 47.242 RTNR.PS2 7.000 TNRA.PS2
RCNT. PS2 2061.135 RCFT. PS2 314.754 CNTC. PS2 2212.015 CFTC. PS2
GR.PS2 51.969 TENS.PS2 1350.000 CCL.PS2 0.000
5.238
633.813
7. 097
317. 029
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-MAY-1997 15.56
PAGE:
23
**** FILE TRAILER ****
FILE NAME . EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW CURVES
Curves and log header data for each pass in separate files, raw background pass in last file
PASS NUMBER. 3
DEPTH INCREF~ENT: 0.5000
FILE SUM~b~RY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
11456.5 10796.0
CNTD
LOG HEADER DATA
DATE LOGGED: 24 -APR- 97
SOFTWARE VERSION: CP 42.2
TIME LOGGER ON BOTTOM: 957 24-APR-97
TD DRILLER (FT) · 11650.0
TD LOGGER (FT) : O. 0
TOP LOG INTERVAL (FT) : 10800.0
BOTTOM LOG INTERVAL (FT) : 11447.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
....................................
GR GAMMA RAY CGRS 860
CCL COLLAR LOCATOR CPLC 831
CNTD COMP. NEUTRON CNTD 101
$
BOREHOLE AND CASING DATA
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
PAGE:
24
OPEN HOLE BIT SIZE (IN)
DRILLRRS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
10780.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
2.71
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS 9-28-80
LIMESTONE MATRIX
DID NOT TAG TD.
WELL SHUT IN ®0730 4-24-97.
SHUT IN WHP 1650.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
20-MAY-1997 15:56
TYPE REPR CODE VALUE
..............................
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX)
.......................................................................................
DEPT FT 488059 O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PS3 PU 488059 O0 000 O0 0 7 1 1 4 68 0000000000
RTNR PS3 488059 O0 000 O0 0 7 1 1 4 68 0000000000
TNRA PS3 488059 O0 000 O0 0 7 1 1 4 68 0000000000
RCNT PS3 CPS 488059 O0 000 O0 0 ? 1 1 4 68 0000000000
RCFT PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000
CNTC PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000
CFTC PS3 CPS 488059 O0 000 O0 0 7 1 1 4 68 0000000000
GR PS3 GAPI 488059 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS3 LB 488059 O0 000 O0 0 7 1 1 4 68 0000000000
CCL PS3 V 488059 O0 000 O0 0 7 1 1 4 68 0000000000
.......................................................................................
PAGE: 25
** DATA **
DEPT. 11456.500 NPHI.PS3 31.099 RTNR.PS3 5.290 TNRA.PS3
RCNT. PS3 3215.686 RCFT. PS3 607.843 CNTC. PS3 3372 084 CFTC. PS3
GR.PS3 17.000 TENS.PS3 1095.000 CCL.PS3 0 035
5.608
601.259
** END OF DATA **
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/05/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
20-MAY-1997 15:56
PAGE:
26
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/05/20
ORIGIN : FLIC
TAPE NAME : 97195
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/05/20
ORIGIN : FLIC
REEL NAME : 97195
CONTINUATION # ·
PREVIOUS REEL :
COF~4ENT : BP EXPLORATION, PRUDHOE BAY, J-13, API #50-029-20497-00