Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout180-085PLUGGIN &
State of Alaska mms~ OZL ~ ~U co-s~v~zo~ co~ussZo~
Memorandum To File: APi No.
Well Name
Operator
Review the well file, and comment on' pluq~ing, well head
status, an.d lowcat~on slearance .-,p~vi~e loc. clear, code.
Well head ¢~: off:
Marker post or plate:
Location Cle~
Conclusions
Code
Signed
STATE OF ALASKA
ALA'~ OIL AND GAS CONSERVATION ~.,,JMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. StatUs of Well ' ' Classification of Service Well ....
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 80-85 96-046
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20498
4. Location of well at surface"" --~"~
9. Unit or Lease Name
2486' SNL, 450' EWL, SEC. 22, T10N, R15E Prudhoe Bay Unit
At top of productive interval 10. Well Number
1753' SNL, 1040' WEL, SEC. 28, T10N, R15E 17-04
At total depth 11. F~eld and peel
2176' SNL, 1351' WEL, SEC. 28, T10N, R15E ... Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 1'6. Lease Designation and Serial No. Pool
RKB = 70'I ADL 028334
12' Date Spudded08/28/80 113' DaIeT'D' Reached 114' DateC°mp"Susp"°rAband'115'waterdepth' 'f°ffsh°re 116' N°' °fc°mpleti°ns09/30/80 03/05/96 . N/A MSLI Zero
17. Total DePth (MD+TVD)118. Plug Back Depth (MD+TVD)~19. Directional SUrveY l20. Depth where SSSV set ~1. Thickness of permafrosl
11955 9653 F'~ 1!91.0.... 9618 FT] []y.es ...... ~..N° I N/A MoI 1900'(Approx.)
22. Type 'i=lectric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL, Gyro
23. ' .......... C.A.SING, LINER AND CEMENTING REcoRD .... ' ....
"CASING "sETTING DEPTH HOLE
SIZE VV'r. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" '" 94# ' H-40 Surface 110' 32" 390 sx Amti'c Set II ......
13-3/8" 72# L-80 Surface 2606' 17-1/2" 1975 sx Fondu, 400 sx Permafrost II
9-5/8" 47# L-80/S0095 Surface'l 10680,' "1'2'.1/4,, ;800 sx ClaS~"~G', 300 sx Pe'~;mafrost ,C, ...
7" 29# N-80 10360' 11950' 8-1/2" 550 sx Class'G'
, , , , , , ...... ,, , , .....
24. PerforatiOns open to Production '(MD+TVD of'ToP and Bottom 25. ' ....... TUBING RECORD ....
..........
and ~nterval, size and number) .... SI'ZE DEPTH SET (MD) PACKER SET (MD)
None .........N/A 10321'
MD TVD MD TVD
,
26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
' ...... 1"08'7'9; ......... P&A,' 18 Bbls Class 'G', Sqzd at 2000 psi
7900' Kickoff Plug, 83 Bbls 'G', Sqzd at 1000 psi
7734' ' .... 2nd K/O Plug, 45 Bbls 'G"i Sqzd at 1 i00 p~i '"
27. PRODUCTION TEST
~Date First ProductiOn IMethod of Operation (Flowmg, gas hft, etc.)
Not On Production I. N/A
Date of Test Hours Tested" ' PRODUCTION F~R OIL-BBL .... GAS-MCF ' ' ' WATER-BBL CHOKE SIZE I GAS-OIL RA'rlo
TEST PERIOD I~
I
Fiew Tubing Casing Pressure 3ALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (CORR)
Press. 24-HOUR RATE
28.
Geologic-jr'Ma~ ,s '' 30. '~/' Formation Tests
29.
.... Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name Depth Depth and gravity, GOR, and time of each phase.
, ,
Top Sadlerochit 11136' 9026'
Base Sadlerochit 11882' 9596'
131. List o~'Attachments ..................
Summary of Dady Drilling Reports
132. I hereby cerbfy that the foregoing is true and correct to the best of my knowledge
Signed
.... Date ~/, .'/~
............. T.r./aord~ r~.-! --/ ,--.~. - Title Senior Drilling Engineer
~ ' Prepared By Name/NUmber Terrie Hul~ble, 564-4628
..............
INSTRUCTIONS
GENERAL: Th~s form Is designed for submitting a complete and correct well completion report and log on all types of lands and
leases ~n Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-sltu combustion.
ITEM B.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given ~n other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one ~nterval (mulbple completion), so state in item
16, and in item 24 show the producing intervals for only the ~nterval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
17-4
DESCRIPTION OF WORK COMPLETED
PRE-RIG SIDETRACK CEMENT PLUG & ABANDONMENT
3/5/96:
Performed Cement Plugback in preparation for Rig Sidetrack Drilling as follows:
MIRU CTU & PT equipment. RIH w/CT nozzle & jetted 335 bbls Hot Crude through the tubing to
remove asphaltenes. POOH w/nozzle & swapped to cementing nozzle. RIH w/nozzle loading the
well w/Hot Seawater. Tagged PBTD at 11167' MD then PU & pumped 18 bbls of 15.8 ppg Class G
cement across the open perforation intervals located at:
11019 - 11043' MD (Sag)
11140 - 11160' MD (Z4)
Ref. Log: BHCS 9/30/80.
Attained a maximum squeeze pressure of 2000 psi & placed a total of 8 bbls of cement behind pipe.
Held 1000 psi final pressure. POOH w/CT leaving an estimated cement top at 10879' MD. RD.
319/96:
RIH w/jet cutter & cut the 3-1/2" tubing at 10242' MD. POOH w/cutter.
Left the well w/cut tubing and the lower wellbore plugged & abandoned for Rig Sidetracking.
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX ! ARCO
Well Name: 17-04A Rig Name: Nabors 2ES AFE: 4J0319
17-04AL1
Accept Date: 03/19/96 Spud Date: 03127/96 Release Date: 05]01/96
Mar 19 1996 (1)
Rig moved 100 %. Rigged up Drillfloor / Derrick.
Mar 20 1996 (2)
Held safety meeting. Rigged up High pressure lines. Rigged up Lubricator,
Removed Hanger plug. Held safety meeting. Held drill (Fire). Removed Hanger
plug. Freeze protect well - 120 bbl of Diesel. Removed Xmas tree. Rigged up BOP
stack. Tested BOP stack. Held safety meeting. Held drill (Fire). Tested BOP stack,
Installed Accessories. Tested BOP stack. Repaired Top ram.
Mar 21 1996 (3)
Tested BOP stack. Removed Tubing hanger. Circulated at 10250 ft. Laid down
Tubing of 11250 ft. Held safety meeting. Laid down Tubing of 11250 ft. Rigged up
Kelly. Laid down Tubing of 11250 ft. Held safety meeting. Rigged down Tubing
handling equipment. Tested Blind ram. Installed Wear bushing. Rigged up
subsurface equipment - Cement retainer. Ran Drillpipe to 8245 ft (4.5 in OD).
Mar 22 1996 (4)
Ran Drillpipe to 8245 ft (4.5 in OD). Set packer at 8245 ft with 0 psi. Tested Cement
retainer- Via annulus and string. Circulated at 8245 ft. Held safety meeting. Pulled
Drillpipe in stands to 0 ft. Made up BHA no. 2. R.I.H. to 8011 ft. Milled Casing at
8011 ft. Held safety meeting. Milled Casing at 8046 ft.
Mar 23 1996 (5)
Milled Casing at 8061 ft. Circulated at 8061 ft. Pulled out of hole to 682 ft. Held
safety meeting. Pulled BHA. Ran Drillpipe in stands to 7966 ft. Washed to 8161 ft.
Circulated at 8161 ft. Held safety meeting. Tested High pressure lines. Mixed and
pumped slurry- 38 bbl. Displaced slurry - 133 bbl. Pulled Drillpipe in stands to
7026 ft. Held 1000 psi pressure on 7.5 bbl squeezed cement. Held safety meeting.
Serviced Block line. Pulled Drillpipe in stands to 0 ft. Removed Wear bushing. Tested
All functions.
RECEIVED
Operations Summary for('
· ~/'-04A & 17-04AL1
· i
Mar 24 1996 (6)
Tested All functions. Rigged down High pressure lines. Installed Wear bushinq.
Made up BHA no. 3. Held safety meeting. R.I.H. to 7922 ft. Held drill (Kick (well k~il)).
Backreamed to 8000 ft. Circulated at 8000 ft. Tested Casing - Via string. Pulled out
of hole to 834 ft. Held safety meeting. Pulled BHA. Ran Ddllpipe in stands to 7966 ft.
Batch mixed slurry - 45 bbl. Held safety meeting. Mixed and pumped slurry - 45 bbl.
Mar 25 1996 (7)
Pulled Drillpipe in stands to 6745 ft. Circulated at 6745 ft. Held 1000 psi pressure
on 17.5 bbl squeezed cement. Pulled Drillpipe in stands to 0 ft. Held safety meeting,
Made up BHA no. 4. R.I.H. to 7676 ft. Drilled cement to 7751 ft. Circulated at 7751
ft. Tested Casing - Via string, Drilled cement to 7900 ft. Circulated at 7900 ft. Pulled
out of hole to 7427 ft. Held safety meeting. Serviced Block line. Pulled out of hole to
673 ft. Pulled BHA. Made up BHA no. 5. R.I.H. to 7700 ft.
Mar 26 1996 (8)
R.I.H. to 7700 ft. Milled Casing at 7745 ft. Circulated at 7745 ft. Pulled out of hole to
678 ft. Pulled BHA. Pulled Drillpipe in stands to 1000 ft. Held safety meeting. Ran
Drillpipe in stands to 7845 ft. Washed to 7845 ft.
Mar 27 1996 (9)
Pulled Drillpipe in stands to 6435 ft. Held 1100 psi pressure on 7.4 bbl squeezed
cement. Pulled Drillpipe in stands to 0 ft. Serviced BOP stack. Held safety meeting.
Made up BHA no. 6 , R.I,H. to 6403 ft. Serviced Block line. R.I.H, to 7648 ft. Drilled
cement to 7722 ft. Held safety meeting. Drilled cement to 7734 ft. Drilled to 7788 ft.
Mar 28 1996 (10)
Drilled to 8196 ft. Held safety meeting. Circulated at 8196 ft. Pulled out of hole to
7000 ft. Held safety meeting. Pulled out of hole_~to 835 ft, Pulled BHA. Made up BHA
no. 7. R.I.H. to 4000 ft.
Mar 29 1996 (11)
R.I.H. to 8196 ft. Took MWD survey at 8171 ft. Drilled to 8759 ft. Held safety meeting.
Circulated at 8759 ft. Pulled out of hole to 7700 ft. Repaired Shaker discharge line.
R.I.H. to 8759 ft. Drilled to 8840 ft.
Mar 30 1996 (12)
Drilled to 9180 ft. Held safety meeting. Drilled to 9747 ft. Circulated at 9747 ft. Held
safety meeting. Drilled to 9908 ft.
RECEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ~ Suspend Operabon Shutdown ~ Re-enter suspended well .
Alter casing ~ Repair well Plugging x Time extension ~ Sbmul~te
Change approved program Pull tubing ~" Variance ~ Pedorate ~ Other
.. Plug Back for S~detrack
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2486' FNL, 450' FWL, Section 22, TION, R15E, UM
At top of productive interval
1753' FNL, 1040' FEL, Section 28, TION, R15E, UM
At effective depth
2176' FNL, 1351' FEL, Section 28, TION, R15E, UM
At total depth
2176' FNL, 1351' FEL, Section 28, T1 ON, R 15E, UM
12. Present well condition summary
Total depth:
5. Type of Well:
Development
Exploratory
Strahgraphlc
Sennce
ORIGINAL
6. Datum elevation (DF or KB)
KB = 70 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
DS 17-4
9. Permit number
80-85
10. APl number
50- 029-20498
11.
Field/Pool
Prudhoe Bay Field/Oil Pool
measured 11955 feet Plugs (measured) Fill at 11004' MD (6/94)
true vertical 9653 feet
Effective depth: measured 11004 feet Junk (measured)
true vertical 8922 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 80' 20" 390 sx ASII 110' 110'
Surface 2567' 13-3/8" 1975 sx Fondu & 400 sx PFII 2606' 2606'
Intermediate 10644' 9-5/8" 8oo sx cl 'G' & 300 sx PF C 10680' 8685'
Production
10360'- 119~ ~'~ ~" '~ ~ V ~4 9650'
Liner 1528' 7' 550 sx Cl 'G'
Perforation depth: measured 11019-11043', 11140'-11160'
t,~AR 0 4 1oj96
true vertical 8934'-8958', 902959044,
AJaska Oi~ & C~.='~s Co,qs. Ccmmiss~
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT at 40'MD; 3-1/2", 9.3#, L-80, PCT at 104(]9' MD
Packers and SSSV (type and measured depth) 9-5/8" Baker 'SAB' pkr at 10321'; 3-1/2" Camco ~RDP' SSSV at 2211' MD
13. Attachments Descnption summary of proposal x Detailed operations program
BOP sketch
14. Estimated date for commencing operation
March 1, 1996
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas~
Suspended~
Service
17. J hereby ~f~ that the f%~g~g~'~gJe and correct to the best of my knowledge.
, Si~lned /~_(,,,/,/~~~, Title Sen/or Drillin~ En~Tineer
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ,,-'- Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10-
~)rJglnal Signed By
· ii
Date
I Approva,
Approved. Copy
BP EXPLORATION
ARCO Alaska, Inc.
To: ,NDGCC Anchorage
Date: March 1, 1996
From: Z. Runje BPX - MB 8-1
SubJect: Well DS 17-4 Sundry ~
Pre-Rig Work: Notify AOGCC prior to commencing with plug-back operations.
1. R/U slick line and RIH to 2211' MD and lock open TRSSSV. POOH with shck hne.
2. R/U CTU and RIH to ~ 5684' and clear hydrates obstruction. POOH with CTU.
,
R/U cement unit & establish an ~nject~on rate. Bullhead cement and squeeze perforations at 11019' -
11160' MD. Displace to leave the top of cement ~ns~de of 7" liner at no lower then 10919' MD. Pressure
test as per AOGCC requirements. ( Total volume of cement should be: 8 bbls ( 7" liner~ 5 bbls will be
squeezed away for the total volume of 13 bbls )
NOTE#l: The objective here ~s the following:
a.
To fill 7" liner up to 100' above the top of perfs.
To squeeze away 5 bbls of slurry
.
R/U E-I.__.._.~ine, tag cmt plug, verify atleast 10919' MD. Pick up and cut 3-1/2" tbg ~ 10250' MD.
Freeze protect the top 2200' MD of inner annulus and tbg with d~esel. Bleed off any pressure from tubing
and inner / outer annuh.
6. Set BPV & test from below to 1000 psi. Secure well.
7. Remove the well house and flowhnes. If necessary, level the pad and d~g out the cellar.
Alaska 0il & ~.-:,.~ Cons. commissio~
We1'1: 17 - 04
Spud DaCe.. 08/28/80
Original RKBE: 70'
Top of Formation: 11137'
Annular Flu/d: Diesel/SW
Reference Log: B~CS
API#: 50-029-20498-00
C~letion.- 03/19/88
Hanger Type: FMC Gen III
Max Ho]e Angle: 57° 9 MD: 9300'
Date:09/30/80 Tie In:
Status: Workover
Hanger: 27'
Angle @ TS:38°
Angle ~ //):38°
Date: 00/00/00
ALL DEPTHS A~B RKB DRILLIN(~ MD TO TOP OF EOUIPMENT EXCEPT WHER~ NOTED.
J
DC_
Jeweler
~1 Depth
I 40'
2 2211'
~2 3 10306'
4 10321'
5 10396'
6 10408'
7 10409'
10372'
9
10
J-$
~6,7
C~2 - t~%o9
J-9,10,11
0-3
11
(,7)
Crossovt~ 4-1/2' x 3-1/2'
3-1/2' Baknr ~ ~~?
3-1/2' Ot~ ~ Ni~le ~2.75'
3-1/2' ~ ~~C ~
3-1/2' ~ Tat1
~ ~ T~I (~ 02/17/89)
F~= ~-~-20-~ 3/8' (~sC 02/18/94)
FI~= ~P ~ ~ 11130' Fell ~ hole; W/~d
(SeC 02/16/94)
~= ~-R-20 (~sC 05/10/89)
Ilia ID: 3-1/3" Otil XN II:I,M~I. :1:D-3.75"
I 13-3/8' 72t L-80 0' 2606' Casing
2 9-5/8' 479 L-80 0' 10680' Casing
3 7 · 299 L-80 10360' 11950' Liner
4-1/2' 12.69 L-80 0' 40' Tubing-PC
3-1/2' 9.3# L-80 40' 10409' Tubing-PC
esi Lift
~D TVD
3020' (3020'
5062' (5014'
7196' (6511'
7937' (7006
8310' (7253'
8688' (7498'
9130' (7766'
9574' (8007'
10194' (8362')
Port TI~O Dst®
1/4' 1838 02/18/94
1/4' 1828 02/18/94
3/8'
01LTF 02/18/94
02110/94
Per£oration Data (ELM DEPTHS) (P)
Interval Zone FT SPF
1 11019-11023 SAG 4 4
11023-11028 SAG 5 8
11028-11033 SAG 5 12
11033-11039 SAG 6 8
11039-11043 SAG 4 4
11140-11160 4 20 3/4
m.
fll~¢ 05/07/89~ SAO 03/17~94
Datum
8700' SS=10802' MD
8800' SS=10937' MD
PBTD=11910'
TD=11955'
02/17/89 APERF
02/17/89 ~PERF
02/17/89 RP~RF
02/17/89 RP~RF
05/21/82 ZPERF
09/08/89 APERF
Revi.ton Date: 03/19/94
Reasc~: GLV 1,2,4; IBP/FISH/FRAC
Previous Reason: 02/12/94
600 W. Intem~flMKII AIR)od Road
AJ~horacje. AK 99618-1199
ATTN: Sherde
NO. 8872
Company: Alaska OII & Gc~ Corm Oomm , Afln: Larry Grant
I 3001 Poroupine Drive
Anohorage, AK 99601
8/19/94
field: Pmdhoe Bay
Well Log Deecflption BL RR Sepia RF Sepia Mylar
D:S~.'1-24A IPERF RECORD (7.29J94~)' _ ,, 1 .... 1 .,
.D.S. 3-16 ..... PERF RECORD (7-,29-..94) 1 1
:DIS. 3-16 ,,, INJEC? P,ROFILE (7-30-94). 1 1
D.S. 12',17 PROD PROFILE (7-28-94) ..... 1 1
~D:S. 15-~5 PERF RECORD(7-31.94) .... 1 1
!~).S. 1~-,~ .... PROD PROFILE (7-2994I] ........ 1 1
~.. 1'30 "' PERF REC~,RD (7.-.29-94) . , , 1 1 .....
Os., .... 12-2, , , PERF REOO ,R~).. ~7.-)0-94~) , 1 1
~D.S. 12-32 pROD PROfiLE ~'7-28-94) , ,,
~. 15-36 G~R~ooL JEWELRY ~-31.9~ ........
Z).~.' 16.c-,~ ' p~:RF RECORD (7-3 !-94) ..
D,,~. 16~9A' ' '. ...... HI,~H RATE INJE¢ PROFILE (7-.~1-94), . ,
SIGNED:
Please sign and return one copy of thi~ transmittal to Sherrle at the above addreM. Thank you.
ARCO Alaska, Inc('
Post Office t~ux 100360
Anchorage Alaska 99510-0360
Telephone 907 276 1215
July 21, 1994
Ms. Joan Miller
Alaska Oil and Gas Conservation
Commission
300 ! Porcupine Drive
Anchorage, AK 99501
Re: Well 17-04 Approval Cancellations
Dear Ms. Miller:
Per our phone conversation of 7/15/94, please cancel the following
work Approvals:
(1) Permit To Drill - for Rig Sidetracking a new 17-04A wellboro//__~'"~-
(Dated 2/93; Approval # 92-150), and 't ~-*-/~'~ .
(2) wellbore (Dated 1/93~p/)rova] ~. of
Application Sundry -~0r_the Pre-S_'dl.d.~track Plugback 17-04~
Plans to Sidetrack Well 17-04 have been canceled. A successful
Hydraulic Refracture Treatment of the Sag River was performed
2/17/94 as an alternative to the Sidetrack. The well is currently
producing at about 800 BOPD, 60% Watercut, & 800 GOR. A Report
Sundry for the Fracture Treatment has been fried with AOGCC.
Sincerely,
/~~n ~. Peirce ---
Engineering Aide
JWP/013
cc. ~/'~. L. Cawvey - (ARCO) - ATO- 1520
CD. A. Cismoski- (ARCO) - ATO- 1509
M. Sloan - {BPX) - Drilling Dept.
RECEIVED
JL/L 2 5 1994
aaska O~l & Gas Cons. Commission
Anchorsge
STATE OF ALASKA
ALASKA( ~ AND GAS CONSERVATION CO(' ~llSSION
REPORT OF SUNDRY WELL OPERATIONS
' i. Operations performed: Operation shutdown Stimulate X Plugging Perforate
Pull ruing Alter casing
2. Name of Operator
ARCO Alaska~ Inc. .
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
, ~ ,
4. Location of well at surface
2486' FNL, 450' FWL, Sec. 22, T1 ON, R15E, UM
At top of productive interval
1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM
At effective depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
At total depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
12. Present well condition summary
Repair well Olher
5. Type of Well
Development
Exl~oram~y
Stral]graph~c
JUL 1 1 199¢
Alaska 0il & {;las Con& Commission
~om~o
Total depth: measured 11955 feet
true vertical 9653 feet
Effective depth: measured 11004 feet
true vertical 8922 feet
6. Datum of elevaii°n(DF or KB)
70' RKB
·
7. Unit or Property
Prudhoe Bay Unit
feet
8. Well number
17-4
91 'Permit number/apprOval number
8O-85
10. APl number
50 - 029-20498
11. Field/Pool
Prudhoe Bay Oil Pool
Plugs(measured) Fill @ 11004' MD (6/29/94)
ORiGiNAL
Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 300 sx AS II 110' 110'
Sudace 2567' 13-3/8" 1975 sx Fondu & 400 sx PF II 2606' 2606'
Production 10644' 9-5/8" 800 sx Cl G & 300 sx PFC 10680' 8685'
Liner 1528' 7" 550 sx Cl G 10360-11950' 8474-9650'
Perforation depth: measured 11019-11043'; 11140-11160'
true vertical 8934-8958'; 9029-9044'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PCT @ 10409' MD
Packers and SSSV (type and measured depth) 9-5/8" Baker SAB pkr @ 10321'; 3-1/2" Camco TRDP SSSV @ 2211' MD
13, Stimulation or Cement squeeze summary '
Intervals treated(measured) See Attached
Treatment description including volumes used and final pressure
14. ReDresentative 13~ilv Awr~ ~ ~. prr,~l, ,r~inn n, I~,; ; r, ·
17-04
DESCRIPTION OF WORK COMPLETED
REFRACTURE TREATMENT OF SAG RIVER
2110/94'
RIH & tagged PBTD at 11573' MD.
2/11/94:
MIRU CTU & PT equipment. RIH w/CT & pumped Gelled Sand Slurry, containing 7400 lbs of 20/40
mesh sand, to spot a sand plug over the lower perforation interval located at:
11140 - 11160' MD (Z4)
Ref. Log: BHCS 9/30/80.
POOH w/CT leaving sand back job incomplete due to mechanical problems. Left sand plug top at
11481' MD. Rigged down.
2/12/94:
MIRU & PT equipment. RIH & tagged the sand plug top at 11359' MD. Loaded the wellbore
w/Seawater, then ran & set an Inflatable Bridge Plug in the 7" liner at 11130' MD (element).
POOH. Rigged down.
2/13/94:
MIRU CTU & PT equipment. RIH w/CT & pumped gelled sand slurry containing 1700 lbs of 20/40
mesh sand on top of the Bridge Plug, to raise the top of the sand plug to 11055' MD. Made final top of
sand plug tag at 11070' MD. POOH w/CT. Rigged down.
2/16/94:
RIH & tagged the top of the sand plug at 11063' MD.
2/17/94'
MIRU & PT equipment to 9000 psi. Pumped a Hydraulic Refracture Treatment using 16/20 mesh
proppant, through the top pedorations located above the sand plug at:
11019 - 11043' MD (Sag)
Ref. Log: BHCS 9/30/80.
Pumped 200 bbls 20# Pre Pad Gel @ 35 bpm, followed by Shutdown. ISIP @ 2233.
Resumed pumping Data Frac consisting of 300 bbls 50# Crosslinked Gel @ 35 bpm, followed by 109
bbls Flush @ 35 bpm, followed by Shutdown. ISIP @ 2526 psi.
Resumed pumping the Fracture Treatment consisting of 950 bbls 40# Crosslinked Gelled Pad @ 30
bpm, followed by 655 bbls Slurry w/proppant concentrations @ 1 - 6 ppg, followed by 108 bbls
Flush, followed by Shutdown.
Placed a total of 81,800 lbs of proppant into the formation. Rigged down.
ARCO Aluka, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 7-20-93
REFERENCE: ARCO CASED HOLE FINALS
1-28 3~'~ %-18-93
3-25A ~]'~3 6-17-93
3-31 f~-?z 6-16-93
3-32 ~ ~/-/~? 6-15-93
3-33 t ~- ~o 6-16-93
4-8 ?~-,o 6-11-93
5-14 ??-J3 6-12-93
6-22A ~ I.~6-6-93
6-22A ' -6-10-93
7-25 ~-Y [. 6-6-93
9-44 f ~ -~ z~6.6.93
11-18 f~-~z6-7-93
14-6 ~'f~- ~6-8-93
14-8 7~-/,? 6-10-93
14-13 ~t~]016-13-93
14-15 ;F~ 6-8-93
16-4A tz-I¢, 6-9-93
16-17 ~ff- zz'6-14-93
16-31 ~ ~,-~ [ 6-7-93
17-4 ~~ 6-14-93
AGI-5 ~-~'-6-13-93
AGI-6 ?~-o~ 6-14-93
AGI-7 · _6-8-93
AGI-7 } {~'r!6-15-93
AGI-7 6-17-93
Prod Profile Run 1, 5" Sch
Completion Record Run 1, 5" Sch
Plug Setting Record R-_n 1, 5" Sch
Plug Setting Record R-- 1, 5" Sch
Plug Setting Record Run 1, 5" Sch
Per/Record R.~ 1, 5" Sch
TBG Cutter Record Run 1, 5" Sch
Leak Detect R~m I 2" Sch
Leak Detect Run 1, 5" Sch
Per/Record Run 1, 5" Sch
Per/Record Run 1, 5" Sch
Production Log Run 1, 5" Sch
PITS/Leak Detect Ru_- 1, 5" Sch
Leak Detect Run 1, 2'&5'* Sch
Inj Profile R-n 1, 5" Sch
Completion Record R-n 1, 5" Sch
Prod Profile Run 1, 1'&5' Sch
Gas Lift Run 1, 2"&5" Sch
Per/Record R-- 1, 5" Sch
Production Log R-_~ 1, 5" Sch
Completion Record Run 1, 5" Sch
Completion Record Run 1, 5" Sch
GR/CCL Run 1, 5" Sch
Completion Record Run 1, 5" Sch
Per/Record Run 1, 5" Sch
GR/(XX, Run 1, 5" Sch
1, 5"
AGI-8 ~3-33,,6-9-93
AGI-9 ~.~ 6-9-93
6-17-93
CA//CCL Run 1, 5" Sch
AGI- ~ Per/Record R;;- Sch
return receipt
RECEIVED B'
Have A Nice
Sonya Wallace
ATO-1529
# CENTRAL FILES
# CHEVRON
#BPX
# STATE OF ALASKA
The correct A~# for 3-32 is 50-029-21141-00.
ARCO Alaska, Inc.
P.O.Boz 100360
Anchorage, Alaska 99510
DATE: 3-15-93
REFERENCE:
ARCO CASED HOLE FINALS
~-58T 12-1-92 DSN Run 1,
(~'71o~ ~0_~_/3~ 12-14-92 In# Profile Rim 1,
12-29~2 In# Profile Run 1,
5-2-92 TMD Rim 1,
12-13~92 Prod Proffie Run 1.
-25 12.13-92 Prod Profile lhm 1,
~ 1-17-93 Set Baker mP/CCL Run 1.
14-5A 1-7-93 Prod Profile lh_m 1,
~14-11 11-23-92 Gas Lift Run 1,
17-4 12-12-92 Temperature Rim 1, fY'
Camco
Camco
Camco
Camco
Please sign and return the attached copy as receipt of data.
Have A Nice Day!
Sonya Wallace
ATO- 1529
APPROVED__~___
Trans# 93032
# CENTRAL FILES
# CHEVRON
D&M
# LUCILLE JOHNSTON
# EXXON
MARATHON
# MOBIL
# PHILLIPS
PB WELL ~
R&D
# BPX
# STATE OF ALASKA
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS ,JN
APPLICATION FOR SUNDRY APPROV
1. Type of Request: Abandon x Suspend ~ Operaaon Shutdown ~ Re-enter suspended well . ~
Alter casing ~ Repar well Pluggmng x Time exten~on Samulate /
Change approved program ~ ----~11 tubing ~ Vanance ~ P~a~e ~ ~ x~'.P~. ~back for Redrill
2. Name of Operator ~ 5. Type of Well: 6. Datum elevation -(~F~ KB)
ARCO Alaska, Inc. I Dev~opment x ~ K~ ,- 70 feet
Exploratory ~.
3. Address Sa'al~graph~c 7. Unit or Property name
P. O. Box 196612, Anchorage, Alaska 99519-6612 Ser~ce Prudhoe Bay Unit
4. Location of well at surface 8. Well number
2486' FNL, 450' FWL, Section 22, TION, R15E, UM DS 17-4
At top of productive interval 9. Permit number
1753' FNL, 1040' FEL, Section 28, TION, R15E, UM 80-85
At effective depth 101 APl number
2176' FNL, 1351' FEL, Section 28, TION, R15E, UM 50- 029-20498
At total depth 11. Field/Pool
2176' FNL, 1351' FEL, Section 28, TI ON, R15E, UM Prudhoe Bay Field~Oil Pool
12. Present well condition summary
Total depth: measured 11955 feet Plugs (measured)
true vertical 9653 feet
Effective depth: measured 11910 feet Junk (measured)
true vertical 9618 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
80' 20" 390 sx ASII 110' 110'
2567' 13-3/8" 1975 sx Fondu & 400 sx PFII 2606' 2606'
10644' 9-5/8" 800sxCl'G'&3OOsxPFC 10680' 8685'
1528' 7" 550 SX CI ~'
measured 11019-11043', 11140'-11160'
true vertical 8934'-8958', 9029'-9044'
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 @ 10409'
DEC 2 2 1992
Alaska Oil & Gas Cons. uummission
Anchorage
Packers and SSSV (type and measured depth) 9-5/8" Baker 'SAB' pkr @ 10321 ? 3-1/2" Camco 'TRDP' SSS V @ 2211'
r
13. Attachments Description summary of proposal x Detailed operations program
BOP sketch _z__
14. Estimated date for commencing operation
February 1, 1993
16. If proposal was verbally approved
15. Status of well classification as:
Oil x Gas
Suspended
for 17-4A REDRILL
Procedure Outline: (Refer to attached wellbore schematic)
1. Notify an AOGCC representative pdor to commencing operations.
.
Rig up coiled tubing unit. RIH circulating seawater to kill the well. RIH to current
PBTD of 11,614' MD (9/89 TD tag). Lay a cement plug from this PBTD leaving the
top of the cement plug at 10,910' MD (100' above the top perforation) or higher.
3. RU slickline unit. RIH and confirm cement top at least 100' above top perforations.
Note' Tag to be witnessed by AOGCC representative.
4. RU E-line and make a tubing cut at +/-8700' MD.
,
Circulate well over to seawater removing all hydrocarbons from the wellbore and
freeze protect tubing and annulus to 2000'.
6. Bleed tubing, inner annulus, and outer annulus to 0 psi.
7~
.
.
10.
Set 4-1/2" BPV. Remove the well house and flowlines. Level the pad and dig out
the cellar. Prepare pad for RWO.
MIRU workover rig. Pull 4-1/2"/3-1/2" tubing.
RIH and set a 9-5/8" bridge plug at 8,580' MD. ~
· ~
After milling a section out of the 9-5/8" casing from 83~0' - 8380' MD, a kick-off
plug will be set with the base of the kick-off plug to be +/- 8480' MD.
Note: This is consistant with the plugback waiver memo 4/15/92 granted for the
Prudhoe Bay field sidetracks and redrills.
RECEIVED
DEC 2 2 1992
Alaska Oil & Gas Cons. Comrmss'~,
Anchorage
BASED ON
ENGINEER~~ EP.-?'.~o,J DEPT. APP'VL
ENGINEERING DATA
BUISN~ETIAFE NO.
DATE ~ FILE NO.
SHEET NO.~ OF~
' 'I
RECEIVEC
/
/// / / / /
__.......--.-----
/1II/
/
/ ///
1111
DEC 2 2 1992
Alaska Oil & ~as Cons. Commiss..
Anchorage
DOYON 16
13 5/8" 5,000 psi Stack
10.15
4.5
5.02
1.02
1.80
2.35
0.25
GROUND
I I"% Ir'"'l
"' RKB ~
J
I I
HYDRIL
~FLO
Variable 3.5"x 6" Pipe Ram
12.40
Variable 4.5"x 7L" Pipe Ram
MUD
CROSS
R
15.40
17.60
Blind Ram
TBG
SPOOL
SPOOL
20.70
24.85
25.10
RECF. IVE ?
STATE OF ALASKA
' ALASKA/' ._A. ND GAS CONSERVATION CC(' /llSSION
' REPORT L,r- SUNDRY WELL OPERATIONS
1. Operations performed: Operat=n shutdown Stimulate X Plugging Perforate X
2. Name of Operator
Pull ruling
,..._ Alter casing .--.-, Repair well
ARCO A~ Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
3061' FNL, 1104' FWL, Sec. 22, T10N, R15E, UM
At top of productive interval
2555' FNL, 1973' FEL, Sec. 15, T10N, R15E, UM
At effective depth
2433' FNL, 1863' FEL, Sec. 15, T10N, R15E, UM
At total depth
2409' FNL, 1841' FEL, Sec. 15, T10N, R15E, UM
12. Present well condition summary
~Well
Development X~
Exploratory
Stral]graph~c
J. Serwce
Total depth:
measured 12137 feet
true vertical 9182 feet
o~ x__
6. Datum of elevation(DF or KB)
feet
71 RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
17-14
9. Permit number/approval number
84-166
10. APl number
50 - 029-21190
,,
11. Field/Pool
Prudhoe Bay Oil Pool
Plugs(measured) 11896' MD; 8974' TVD
Effective depth: measured 11896 feet
true vertical 8974 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1870# Poleset 110' 110'
Surface 2463' 13-3/8" 2000 sx CS III & 400 sx CS II 2497' 2497'
Production 11520' 9-5/8" 550 sx Cl 'G' & 300 sx CS I 11554' 8672'
Liner 821' 7" 364 sx Cl 'G' 11285-12106, 8435-9155'
Perforation depth: measured 11640-11662'; 11747-11780'; 11780-11820'; 11830-11870'; 11870-11887';[isolated
below bddge plug: 11922-11936'; 11939-11943'; 11971-11981 ']
true vertical 8751-8770'; 8845-8874'; 8874-8908'; 8917-8952'; 8952-8966' [isolated below bridge plug;
8996-9009'; 9011-9015'; 9039-9047']
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 11277' MD; 4-1/2", 12.6#, L-80, PCT tail @ 11375'
MD
Packers and SSSV (type and measured depth) Baker FB-1 packer @ 11257' MD; 5-1/2", Camco -
13. Stimulation or cement squeeze summary Ba~
Intervals treated(measured) See attached
APR u 9 ]9,91
: Treatment description including volumes used and final pressure A[as~(a Oil & Gas Cons. C0mm_issI~
14."-'~--~'~ ~Q.,~.,~.~:~tive r)ailv Avc, r~ ~ Prnrh~r, tinn nr Ini,-.,t..~,~ r,, + =~'~-~'=~~'"'
DS 17-14
DESCRIPTION OF WORK COMPLETED
FRACTURE TREATMENT OF SAG RIVER & ZONE 4
12/10/90:
MIRU & PT equipment to 4000 psi.
at 11,896' MD (top of plug), to isolate pedorations below plug at:
11922 - 11936' MD (Z3)
11939 - 11943' MD (Z3)
11971 - 11981' MD (Z3)
RIH w/CT mounted Inflatable Bridge Plug & set
POOH. RD. Flowed well.
Ref. Log: LSS 12/21/84.
I 2/1 3/90:
RIH w/dump bailer & dumped 5' of 20/40 sand on top of bridge plug.
Ref. Log: LSS 12/21/84.
I 2/27/90:
Reperforated:
11780 - 11820' MD (Z4)
11830 - 11870' MD (Z4)
I/6/9 1:
MIRU & PT equipment to 7500 psi.
perforations above the bridge plug at:
Pumped:
11640 - 11662' MD (Sag)
11747 - 11780' MD (Z4)
11780 - 11820' MD (Z4)
11830 - 11870' MD (Z4)
11870 - 11887' MD (Z4)
POOH. RD.
Pumped a Propped Fracture Treatment through
Ref. Log: LSS 12/21/84.
a) 300 bbls Pre Pad, @ 50 bpm & 4500 psi, followed by
b) Shutdown. ISIP @ 1420.
Resumed
pumping:
c) 4850 bbls Pad, @ 50 bpm & 4750 psi, followed by
d) 1830 bbls Slurry, at 2 - 12 ppg proppant concentrations, followed by
e) 270 bbls Flush, followed by
f) Shutdown. ISIP @ 2600.
Placed a total of 340,360 lbs of proppant into the formation.
1/11/91 - 3/3/91:
Performed proppant fill cleanouts & intermittently flowed well.
3/22/91 .'
Pumped a scale inhibition treatment.
Rigged down.
Returned well to fulltime prorll,~tinn ~ nht'-in,,~l ,-,,,,~=4 ,.,,,11,,,
ARCO ALASKA, INC.
F'~O. BOX 100360 i
ANCHORAGE, ALASKA 995t
DATE tt-27-89
REFERENCE' ARCO CASED HOLE FINRL£
~-34 ~0-t4-89
~-2e ~0-25-89
/'~-27 8-26-8?
fS-i ti-9-89
~ 5-27 ~-4-89
co-J ~-2-89
-?A t0-25-89
~?-~? t8-25-89
~?-2~
~7-30 t~-5'-89
7-33 ~-~-8~
~ 9-~ ~ 0-27-89
· 9-t ~ ~ 0-28-89
~-28
. 9-38
~- ~-~ ~0-27-8~
~,~2-~
PRODUCTION PROFILE
GAMMA D~N
F'ERF RECORD
COLLARzPERF/PACKER
CBT
FM FEMF'
PRODUCTION PROFILE
PRODUCFION PROFILE
PRODUCTION PROFILE
PRODUCTION PROFILE
INJECTION PROFILE
F'IT~
PITS
PITS
INJECTION F'ROFILE/IE~F'
F'RODUCTION F'ROFiLE
LEAK DETECTION
TEMP/GR
PERF RECORD
F'ERF RECORD
F'RODUCTION PROFiLE/LEAK DET.
LEAK DETECTION
CCL/TEMP
iNJECTIUN F'ROFILE
COLLAR/PERF
FUBiNG CUTTER
TEMF'
CNL
PERF RECORD
RUN
RUN
RUN
RUN i,
RUN
RUN
RUN
RUN t,
RUN i,
RU~ i,
RUN t,
RUN
PUN
NUN i,
RUN t,
KUN
RUN t,
RUN l,
RUN i,
RUN i,
RUN t,
RUN i,
RUN t,
RUN t,
RUN
NUN
RUN 1,
RUN i,
RUN 1,
PLEASE SIGN AND RETUjRN THE A'FTACHED
RECEIVED BY .
HAVE A NICE DAY!
NOV 01989
SALLY HOFFECKER
A T O- i 5 2 9 Alaska 0il & Gas Cons. Commissioa
Anchorage
COPY AS RECEIF'F OF DATA.
5'
5"
5"
5'
5'
5'
:?'&5 ·
""&5"
5"
5"
2"&5"
5"
5'
2"&5"
2"&5"
5"
5"
5"
2"
5'
5"
CAt~Cu
HL,£
HL£
AiLRS
'2.'C1-1
bA~CO
CAMCO
CA;lC(]
CAt'~CO
CAMCt]
CA t'l'--
Hi;cZ
l-IR2
HI'(:,.,'
CA~CO
CANCO
CA,CO
CAMCO
SCH
CAMuO
CAMCO
[,At~CO
CA~'~O
ATLAZ
A ~I_AZ
CAMCO
HLZ
DT~TRTRIITI'FIN
ARCO ALASKA, INC.
F'.O. BOX i00360
ANCHORAGE, ALASKA
DATE'
REFERENCE'
ARCO CASED HOLE FINALS
t-4
t -6 t 0-22-89
~-6 t,D-2~ -89
~ -~ 6 t ~-~ 6-89
t -~ 7 ~ ~-~ 9-89
I -23 J ~-2~-89
1 -2~ t e-t 4-89
2-~ J e-~ 8-89
2-t 2 t e.-J ~-89
~ ~5 J e-25-89
4--s2 I e-2~-8~
~4-52 ~ e-25-89
~7- ~ 3 I ¢- ~ 6-89
9-5 J ~-~ ~-89
9-~6 ~8-t ~-89
~ ~-~ 2 I 8-7--89
t t -t 5 t 8-t 3-89
~ 4-23 ~ 8-~ 4-89
~ 6-~ J ~ ~-J 3-89
~ 6-2~ ~ ~-4-89
t 7-4 t 8-~ 4-89
~ 8-J 6 9-~ 8-89
PI_EASE SIGN AND
PRODUCTION PROFILE
CNL-GR
F'DK-t 80/GR/CCL
PRODUCTION PROFILE
PERF RECORD
CNL-GR
PRODUCTION PROFILE
PRODUCTION PROFILE
F'RODUCIION F'ROFILE
CNL
I'EMP SURVEY
CNL-GR
CNL-GR
F'DK-I (~¢/GR/CCL
F'RODUCTiON F'ROFILE
PRODUCTION PROFILE
INJECTION F'ROFILE
F'RODUCf'iON PROFiI_E
TEMP
COMF'LETION RECORD
LEAK DETECTION
TEMF'
PRODUCTION F'ROFILE
PITS
-
RETURN THE ATTACHED
RUN t, 5"
RUN ~, 5"
RUN l, 5"
RUN i, 5"
RUN ~, 5"
RUN i, 5"
RUN 1, 5"
RUN t, 5"
RUN t , 5"
RUN 2,
RUN t,
RUN t, 5"
RUN t, 5'
RUN t,
kUN i, 5"
RUN i,
RUN i, 5"
RUN i,
RUN 1, 2"&5"
RUN
RUN t, 2"
RUN t, 5"
RUN t, 5"
RUN
COF'Y AS RECEIF'T OF' DAIA.
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-~529
CAMCO
AFLA~
ATLA.~
CAMCO
SCH
ATLA.2
CAMCO
CAMCO
CA,cO
~CH
CAMCO
Al'LAY
ATLAS
Af'LA~
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
SCH
CAMCO
CAMCO
CAMCO
CAMCO
DISTRIBUTION
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORATION
EXXON
MARA1HON
MOBIL
* TEIE CORRECI'ED AP]:$ FOR 2-25
** THE C[tRRF~CTFT1 AF'r$ FOR i4-?
PHILLIPS
F'B WELL FILES
R & D
p
B X
S~lATE OF ALASKA
TEXACO
(...,,/ Alns Oil & Cons. Commi i.n
ARCO Alaska, Inc.~
Prudhoe Bay .--n=,..~eering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
August 8, 1989
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 17-4 Approval No. 8-364
Dear Mr. Chatterton:
Attached is the Report of Sundry Well Operations detailing work performed on the
above-referenced well.
Sincerely,
D. F. Scheve
DFS/RAC/jp
Attachment
cc: J.S. Dietz, BP
J. Gruber, ATO-1478
PI(DS 17-4) Wl-3
RECEIVED
~\~aska 0ii & Gas Cons. CommissToti
Anchorage
I
" ALASK.~ STATE OF ALASKA
\ND GAS CONSERVATION C{r ~SION
REPORT ur SUNDRY WELL OPEhATIONS
1. Operations performed: Operation shutdown .--. Stimulate X Pluggmng Perforate
2 Name of Operator
Pull tubing ~
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
Alter casing ~ Repmr well
~Well
Development ~
1 Exploratory ..--.
Straagraph.:: .----
2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM
At top of produchve interval
1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM
At effective depth
At total depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
12. Present well condition summary
Total depth: measured 11955 feet
true vertical 9654 feet
Effective depth: measured 11019 feet
true vertical 8934 feet
Casing Length Size
Conductor 110' 20"
Sudace 2536' 13-3/8"
Production 10610' 9-5/8"
Liner 1590' 7"
Plugs(measured)
Other
6. Datum of elevabon(DF or KB)
70 RKB
7 Unit or Property
Prudhoe Bay Unit
8. Well number
17-4
9. Permit number/approval number
80-85/8-364
10. APl number
50 - 029-20498
11 Field/Pool
Prudhoe Bay Oil Pool
feet
Junk(measured)
Cemented Measured depth True vertical depth
300 SX Permafrost 110' 110'
1975 sx Fondu & 400 sx 2606' 2606'
Permafrost
500 sx Class G 10680' 8685'
550 sx Class G 11950' 9650'
Perforation depth: measured 11019-11023'; 11023-11028'; 11028-11033'; 11033-11039'; 11039-11043'
true vertical 8934-8937'; 8937-8941'; 8941-8945'; 8945-8950'; 8950-8953'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PC tail @ 10409' MD
Packers and SSRV (tvn~ and m.--. ,,r .~ , ., , n , ,-,-
(
DS 17-4 Sag River Fracture Treatment
Post Job Summary
Sequence of Events:
1. Rig up Halliburton for frac on 2/24/89.
2. Pressure tubing by casing annulus to 3000 psig.
3. Pump formation breakdown stage to the Sag River formation perfs 11019'-
11043' MD'(referenced to BHCS log dated 9/30/80). Pump rate 17 bpm at 5300
psig:
20 bbl of 50% xylene and 50% diesel with 10% Musol A
111 bbl slickwater
Shutdown for ISIP.
4. Pump 90 bbl slickwater pump-in/shut-in stage at 20 bpm and 6000 psig. Shut
down for ISIP. Perf friction too high. Decided to pump acid breakdown.
5. Pump acid breakdown treatment at 10 to 12 bpm at 4400 to 4600 psig consisting
of:
12 bbl xylene
48 bbl 12% HCl with ballsealers
48 bbl 6% HCI-1 1/2% Mud Acid with ballsealers
120 bbl 2% NH4CI Water
6. Pump 80 bbl slickwater pump-in/shut-in stage at 20 bpm and 5600 psig.
Shutdown for ISIP. Perf friction still too high, fracture cancelled.
7. Rig up ARCO pump truck on 5/4/89. Pump injectivity test with 150 bbl
methanol/water at up to 7.6 bpm and 3450 psig.
.
10.
11.
12.
13.
14.
15.
Rig up BJ Titan on 5/7/89 for second frac attempt. Pressure annulus to 3000
psig.
Pump 20 bbl of 50% xylene and 50% diesel with 10% Musol A at 5 bpm and 2600
psig.
Pump 116 bbl slickwater formation breakdown stage. Pump rate 20 bpm at 5400
Shutdown for ISIP.
Pump 73 bbl slickwater pump-in/shut-in stage at 20 bpm and 4900 psig.
Pump propped fracture treatment at 20 to 23 bpm and pressures ranging from
4300 to 5200 psig. Pumped 253 bbl of pad, 114 bbl of slurry with proppant
concentrations of 1 to 11 ppg, and 49 bbl of flush.
RDMO BJ Titan.
MIRU slickline unit on 5/8/89 and changeout dummy valves for gas lift valves.
MIRU coil tubing unit and cleanout proppant on 5/20/89.
ARCO Alaska, In4
Prudhoe BI~, .~ngineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
July 11, 1989
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 17-4 Permit No. 80-85
Dear Mr. Chatterton:
Attached is the Application for Sundry Approval detailing work to be
performed on the above-referenced well.
Very truly yours,
D. F. Scheve
DFS/MJF/nmh
Attachment
cc: T.B. Gray, BP Exploration
J. Gruber- ATO 1478
PI(DS 17-4)W1-3
RECEIVED
JUL 1 8
Alaska Oil & Gas Cons.
Anchorage
STATE OF ALASKA
ALASK( ~ILAND GAS CONSERVATION (3( IMISSION
APPLICA rlON FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ... d Operalmn shutdown , , Re-enter suspended well ......
Alter camng Repmr well Plugging . T~me extenmon S1]mulate
Change approved program Pull tubing Vanance Perfor----~te X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Strat~jraph~c
Ser~ce
Other
6. Datum of elevation(DF or KB)
70 feet
7. Unit or Property
Prudhoe Bay Unit
4. Location of well at surface
2486' FNL, 450' FWL, Sec. 22, T10N, R15N, UM
At top of productive interval
1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM
At effective depth
At total depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
8. Well number
DS 17-4
9. Permit number
80-85
10. APl number
50 - 029-20498
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
11955 feet Plugs(measured)
9654 feet
Effective depth: measured 11019 feet
true vertical 8934 feet Junk(measured)
Casing Length Size Cemented
Conductor 110' 20" 300 sx Permafrost
Sudace 2606' 13-3/8" 1975 sx Fondu & 400 sx Permafrost II
Production 10680' 9-5/8" 500 sx Class G
Liner 1590' 7" 550 sx Class G
Measured depth Trueve~icalde~h
110' 110'
2606' 2606'
10680' 8678'
10360'-11950' 8493'-9650'
Perforation depth: measured 11019'-11024', 11024'-11029', 11029'-11039'
true vertical 8934'-8948.8' (3 intervals)
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, PC tubing to 10409' MD
RECEIVED
LIUL ! 8 ]989
Alaska 0il & Gas Cons. Comm[ssi0n
Anchorage
Packers and SSSV (type and measured depth) Baker SAB Packer @ 10321' MD; Camco TRDP-1A-SSA SSSV @ 2211' MD
13. Attachments
Description summary of proposal X Detailed operations program BOP sketch X~
14. Estimated date for commencing operation
July, 1989
16. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
.S.i~ned 2~'/,~ ~) .~ ~ Title Operations Engineering Manager
FOR COMMISSION u~: ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10-
O'RIGINAL SIGNED BY
I i'"T&ll~llr''' ~
15. Status of well classification as:
Suspended
IAppr°val N°' ¢ -- ~:~~
Approved Copy
R~eturne~
Drill Site 17-4
ARCO Alaska, Inc. proposes to perforate at selective intervals within the
Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be
flowed for clean-up. All wireline work will be done through a 5000 psi
WOP/BOP/Lubricator, tested to 1.2 times the maximum expected surface
pressure.
The well is currently SI. Produced fluids will be in the wellbore during
perforating operations. These reperforations are in the Ivishak Zone.
Expected static bottom hole pressuer: 3850 psi.
Perforation Interval (Ivishak)
BHCS Depth ('MD) Depth ('SS)
11140-11160 8960-8975
Alaska 0il & Gas Cons. Comrn'~ss~on
1. 5000 PSI 7" W[LLH[.,AD CONNECTOR IrLAt~GE
2. 5000 PSI WIRI[LIN£ RAMS (VARIABL[ $1Z£)
3. 5000 PSI 4 1/6" LUBRICATOR
4. 5000 PS~ 4 1/6" FLOW TUB[ PACK-OFF
I,I ! REL ! NE Bop, EOUI, PHEN?
ARCO Alaska, Inc.(
Prudhoe Ba~)._ngineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
ORIGI
June 28, 1989
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 17-4 Approval No. 8-'SC~
Dear Mr. Chatterton:
Attached is the Report of Sundry Well Operations detailing work performed on the
above-referenced well.
Very truly yours,
D. F. Scheve
DFS/DRR/jp
Attachment
CC:
T. B. Gray, BP
J. Gruber, ATO-1478
PI(DS 17-4) W1-3
RECEIVED
JUL-3 1989
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc ,s a Subs,d;ary of Atlant,cR,chheldCompany AR3B--6132-C
STATE Of ALASKA
ALASK~ LAND GAS CONSERVATION C~ MISSION
REPORTUF SUNDRY WELL OP'I:RATIONS
1. Operations performed:
Operation shutdown Sttmulate X Plugging Perforate
Pull tubing Alter camng Repmr well Olher
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM
At top of productive interval
1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM
At effective depth
At total depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
12. Present well condition summary
Total depth: measured
true vertical
5. Type of Well
Development
Exploratory
Stra~graph~c
11955 feet Plugs(measured)
9654 feet
x
6. Datum of elevation(DF or KB)
70 RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
17-4
9. Permit number/approval number
80-85/8-369- ~ ~
10. APl number
50 - 029-20498
11. Field/Pool
: Prudhoe Bay Oil Pool
feet
Effective depth: measured 11910 feet
true vertical 9618 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 110' 20" 390 sx AS II 110' 110'
Surface 2536' 13-3/8" 1975 sx Fondu & 2606' 2606'
400 sx Permafrost II
Production 10610' 9-5/8" 800 sx Cl 'G' & 300 sx PFC 10680' 88685'
Liner 1590' 7" 550 sx CI 'G' 11950' 9650'
Perforation depth: measured 11019-11023'; 11023-11028'; 11028-11033'; 11033-11039'; 11039-11043'
true vertical 8934-8937'; 8937-8941'; 8941-8945'; 8945-8950'; 8950-8953'
Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PCT tail @ 10409' MD
Packers and SSSV (type and measured depth) Baker SAB packer # 10321' MD; Camco TRDP-1A-SSA SSSV @ 2211' MD
13. Stimulation or cement squeeze summary R L. ~ C E IV E i~r~l
Intervals treated(measured) See attached
Treatment description including volumes used and final pressure J U L - 1989
14. Representative Paily Avem, ge Production or Injection I~d~ka -'
OiI-Bbl Gas-Md Water-Bbl - Casing Pressu~C~J'lch°rag~'ubing Pressure
Prior to well operation
Subsequent to operation
o 0 0
0 0 o
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil ~ Gas w Suspended .__ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed 24:~~)2~ Title Operations Engineering Manager
Form 10-404 Rev 06/15/88
078 D. R. Reimers, 265-6205
SUBMIT IN DUPLICATE
( (
17-4 SAG RIVER FRACTURE TREATMENT
DE$1~RIPTION OF I~QNDI, II~TED WORK
Arco Alaska Inc. conducted a sand propped hydraulic fracture
treatment on well 17-4 The treatment was initiated with a small
prepad to breakdown the interval and to determine fracture
properties. The main fracture treatment consisted of pumping a 250
Bbl. pad followed with the sand slurry. An outline of conducted
work is included as follows:
May 7, 1989
1.)
Rigged up B. J. Titan pump equipment and sand transport.
Gelled fracture fluid on location. Installed tree saver. Pressure
tested surface lines to 6500 psi. Maintained 3000 psi on 3 1/2"
by 9 5/8" annulus during fracture treatment.
2.) Pumped prepad breakdown treatment as follows:
20 Bbls. 50/50 Diesel/Xylene with 10% mutual solvent
116 Bbls. 10 lb. gelled water.
The prepad treatment was pumped at an average rate of 20
BPM at an injection pressure of 5500 psi. Used to determine
fracture closure pressure, perforation friction and fracture
gradient.
3.)
The sand propped fracture treatment consisted of the
following:
252 Bbls. 40 lb gelled water with 40 lbs/1000 gal oil
soluble resin (fluid loss additive)
109 Bbls. 40 lb. gelled water.with 16-20 Carbolite sand
ramping from 2 ppg to 10 ppg.
48 Bbls. Diesel flush
The treatment had been designed to pump a total of 29,600 lbs
of proppant. During the treatment a sand screen out at the tub
on the blender occurred. A total of 22,000 lbs of sand was
pumped however only 5300 lbs was placed through the
perforations before the treatment screened out.
RECEIVED
J U L - 3 1989
Alaska 0il & Gas Cons. Gommissio~
DATE' 2-23-89
REFEPENCE'
ARCO CASED HOLE FINALS
3-30 2-3-89 COLLAR,-' F'ERF
t -1 ;5 '~-! 7-89 COLLMF/PEN,~
2-5TM 2-'1 8-89 CBT
2-3T:' 2-i 8-89 CE i'
7-4 2-'i 7-8':;' COLLARz PERF
8-o, ,.'~-1 ,.."~-89 PERF RECOF'D
8-23 2-i 7-8° CBT
8-25 2-1 7-89 CET
8-25 2-1 7-89 GN-CCL
PLEASE
N AND RETURN THE ATTACHED CUF'Y A
RUN I, 5"
RU~ i, 5"
RUN '1, 5"
PUN i,
'II "
R_N 1, _
RUN 'i , 5"
RUN
Pud t , 5"
RUN 1 , 5"
ECEIF'[ OF DAFA.
A I-IAi
5 CI--t
$ C H
~ CH
RECE].VED B'~
HAVE A NICE DAY'
ZALL_Y HOFFECKEP
ATO-t 529
TRAN£
APF'RO ED
DI$1RIBUTION
CENTRAL FILES
CHEVRON
D&M
EXTENSION EXPLORATION
EXXON
~ARATHON
MOBIL
¢- PHILLIPS
PB WELL FILES
R & D
~ SAPC
· ¢ $IAYE OF ALAS'KA
~-"- I'E:XACO
J
ARCO Alaska, Inc. [,
Prudhoe Bay Engineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
November 4, 1988
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Comission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
RE: DS 17-4 Permit Number: 80-85
Enclosed is the Application for Sundry Notice detailing work to be performed on
the above-referenced well.
Very truly yours,
D. F. Scheve
DFS/JYJ:sd
Enclosures
cc: Standard Alaska Production Company
JoAnn Gruber, ATO 1478
File PI(DS17-4)W1-3
RECEIVED
NOV u 8 1988
Alaska 0il & Gas Cons. Commission
~,nch0rage
ARCO Alaska, Inc ,s a Subsidiary of AtlanhcR~chf,eldCompany AR3B--6132-C~
(° STATE OF ALASKA (
ALASK~ OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend Operation shutdown
Alter casing Repair well Plugging
Change approved program ~Pull tubing
Re-enter suspended well
Time extension Stimulate
Variance Perforate x Other
2 Name of Operator
ARCO Alaska. Inc.
3. Address
P.O. BOX 100360 Anch, AK 99510
5. Type of Well:
Development _x_
Exploratory
Stratigraphic
Service
.
Location of well at surface
2486'FNL, 450'FWL, Sec. 22, T10N, R15E, UM
At top ot procluctwe interval
1753'FNL, 1040'FEL, Sec. 28, T10N, R15E, UM
At ettect~ve 0eptl~
At total depth
__2176'FNL, 1351'FEL. Sec. 28. T10N. R15E. UM
6. Datum elevation (DF or KB)
70
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
DS 17-4
9.--Permit number
i 80-85__
110. APl number
50-029-204908
11. Field/Pool
Prudhoe Bay Oil Pool.
feet
12.
Present well condition summary:
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
1 1 955 feet Plugs (meaf ~red)
true vertical 9654 feet
measured 1 1 01 9 feet Junk (measured)
true vertical 8934 feet
Length Size Cemented
RECEIVED
Production
L~ner
0il & Gas Cons. Commission
'~~~ ,, True vertical depth
110' 20" 300 sx Permafrost 110' 110'
2606' 13-3/8" 1975 sx Fondu & 2606' 2606'
400 sx Permafrost II
10680' 9-5/8" 500 Sx Class G 10680' 86857'
1590' 7" 550 Sx Class G 11950' 9650'
Perforation depth: measured 11019'°11024', 11024'-11029', 11029'-11039'
true vertical 8934'-8948.8' (3 intervals)
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, PC tubing to 10409'MD
Packers and SSSV (type and measured depth) Baker SAB Packer @ 10321'MD; CamcoTRDP-1A-SSA SSSV @ 2211'MD
13 Attachments: Description summary of proposal x Detailed operations program
BOP sketch x
14. Estimated date for commencing operation
N0vemberl 988
16 If proposal was verbally approved
Name of approver
Date approved
15.
Status of well classification as:
Oil x Gas__ Suspended__
Service
17 I hereb~y certify that the foregoing is true and correct to the best of my knowledge.
, S' g n e d ~,~J,,,~~--/¢-"'~~ Title Operations Engr. Manager Date 7~,/~'~7I
CONDITIONS OF APPROVAL: Notify Commission so representative may witness IApproval
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subs~e, que~nt/,4~m~, required 10-~
Approved by order of the Commissioner, ~~(.~~Q~//~~mmissio nor Datel//~'~ /
-- ' / / SUBMIT iN~RIPL/ICATE
Form 10-403 Rev 06/15/88 Approved Oopy ~/'
Retu rned/~ ,,~
2
1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE
2. 5000 PSI WIRELIN£ RAMS (VARIABLE SIZE)
3. 5000 PSI 4 1/6" LUBRICATOR
4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF
Gas Cons. Comm'xssion
Rnchorage
H ! REL ] NE BOP EOU ] PMENT
I
Drill Site 17-4
ARCO Alaska In.
.the Salerochit .e~c__~Pro. Poses to
will be ,,- .-,,~no of ~ .... reperf ... .
.. ,..._ ,owed for ..,--r'ruOhoe Ba .~r Selective i .
a ouO0 "si "'- ~.-~uan-u,., _.. Y Unit U.-- ntervals .......
exPected"sur~/BOP/Lubri~;to~l{ Wirelin; wo~n P..erforating, t~
ace press.-- ~, rested t- - ~ Will be d--- ~ Well
ute. u '~.2 times ~k.. une through
'"~ maximum
The Well is CUrrently SI PrOduce
during Perforatin ..
River ZOnes :..g_ Opratlons. .r,._d fluids Will be in t
· '-:xpected ~t~,,;.. ,_ ,!~ese reperfora,i,,.._ he Wellbor~
-'""~; oOttom hole nre.._"~"u are in the
Perforation Interval (Sag River) ~' ~ure: 4100 "s'
8HCS
Depth /J I
('MD)
Depth
1~0~9-11039 ~'SS)
8864-8880
RECEIVED
NOV U 8, 1988
Ahska Oil & Gas Cons. Commission
Anchorage
F',O, BOX JO0360
ANCHORAGE, ALA,~'K A
DATE: 9-30-88
REFERENCE' ARCO CASED HOLE FINALS
J-8 9-J0-88 INJEC!ION f-'ROF1LE
?-JO 9-26-88 F'ERF RECORD
.~--22 9-2-7-88 AMENDMEN¥ lO ACBL OF 5--J8--82
~'-22 9-2J-88 PFC
~-t ~--1-88 F'ROI)LJCllON F'ROFILE
3-4 ~-3-88 INJECTION F'ROF ILE
3'"2~ ~-'2- 88 PF(OI)UC ~ ION F'F(OF'iLE
S-22 ~'-1-88 PRODUCYION PROFILE
J-27 ~-2-88 F'RODUCIION PROF1LE
5-'~ ~'-~-88 PRODUClION PROFILE
5-5 ~'-~-'88 F"F;:OI)UCTION PRL)~ 1LE
6-t4 ~-4-88 F'llg
7- J 3 ~--23-88 COLL. AR/PER~.
~.-~ ~-~-88 I-'KUDOC[ION F'RO~iLE
JS-.~ ~-5-88 ~'ROI)UCllON PROF1L. E--POS'I-~ilM,
J 5---J ~A ~-2J -88 VER'FIL. OG
J 5--J OA 9--2J -88 HAGNELUG
iS--J2 ~--J4-88 PRODUCllUN i:'H:UF1LE
J 5-.J 5 ~-.~-.88 f'ROQUC1 ION F'ROl.. 1~ E.
J 5-J ~ ~.-2~.-88 COMF:'LEI iON RECORD
J 5-25 ~ .-.23-88 COLLAR
J 6-4 9-2-88 GAMMA RAY
J6-..J2 ~--5-88 Pi'(tJUUt'llbN ~"h'U~ ILL
t 7-4 9"10-88 F'I F~
t8-t ~'t 1-'88 F"I 1 ~'
I'I..EA,S;E SrGN AND I::EII..JRN I'F ~1 II-'-'Y AS RECE.[I.:'IF L)F
RECF. i VIE. I) BY ................................. OGT-..ui-IB88
HAVE A NICE DAY!
~.'AL.I.. ~' HC)FF ECKER
AFO-J 5,.?
Oil & Gas Guns. Cummission
, , ^nchomge
If RAN,.
APPROYED ...........
D.[L911< J. L'~ILJ I fUN
RUN t , 5"
RUN J , 5"
RUN J , 5"
RUN ~ , 5"
RUN t, 5 ·
RUN J, 5"
RIJN J, 5"
RUN t , 5"
RIJN J, 5"
RUN t, 5"
RUN t, 5"
RUN i, 5'
RUN 2,
RUN t, 5"
NUN t, 5"
RUN t , 5"
NUN t, 5"
RLJN i, 5"
RUN
RUN i, 5"
RIJN t , 5"
h:LjH t,.,
HIJN t, 5"
RUN i, 5"
DATA,
CAMCO
$CH ~
ATLA$~
All_A,g....
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
AIL. A~
CAMCO
CAMCO
AIl_AS
AI'LA~
CAMCO
CAMCO
$C1~
ATLA~
(]AMC()
CAMCO
CAMCO
~ CENlRAL FILES
.~ CHEVRON
l) & M
· "',,. EXI'.I:-":N$1ON EXI-'L. ORAI'ION
~: F. XXON
MAF,,'ATHON
'"' MOB I L.
· ,.'" PI. II LL.LI"3'
F'B WELl_ F ILIE$
R & I)
'"',.SAP[:
~' .S'TArE. OF AL ASKA
~ IEXACO
ARCO ALASKA, INC.
P.O. BOX
ANCHORAGE, ALASKA
995~
DATE: 9-25-88
REFERENCE:
ARCO PRESSURE DATA
it-t5 ?-J-88
ii-t5 9-7-88
tt-24 8-28-88
ii-25 8-5-88
ti-2? 8-t?-88
t7-4 9-i0-88
BHP--STATIC GRADIENT
BHP--$TATIC GRADIENT
BHP--£FATIC GRADIENT
BHF'--PBU
BHF'--F'BU
BHF'--$TAFIC GRADIENT
F'LEAZE 5'IGN AND F(EYURN [FIE AI'I'ACHE~J COPY AZ RECEIF'I' OF
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-t529
TRANS ~88580
APPROVED
DIS[RIBUTION
CAMCO
CAMCO
CAMCO
OTIS
OTIS
CA~CO
DA[A~
CENTRAL FILES ~ P
~ F'HILLI S
CHEVRON F'B WELL I-ILE$
D&M ~ R&D
EXTENSION EXPLORA¥ION ~
~ SAF'C
EXXON ~
~ STATE OF ALASKA
MARATHON ~'~ TEXACO
MOBIL
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Class,f,cat,on of Serv,ce Well
OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc. 80-85
3 Address 8 APl Number
P. 0. Box 100360, Anchor`age, AK 99510 50- 029-20498
4 Location of well at surface 9 Un,t or Lease Name
2486' FNL, 450' FWL, 5ec.22, T10N, R15E, UM Pr,udhoe Bay Unit
At Top Producing Interval 10 Well Number
1753' FNL, 1040' FEL, $ec.28, T10N, R15E, UM 17-4
At Total Depth 11 F~eld and Pool
2176' FNL~ 1351' FEL~ 5ec,28~ T10N~ R15E, UM Prudhoe Bay Field
5 Elevation m feet (mdmate KB, DF, etc ) I 6 Lease Designation and Serial No Prudhoe Bay 0i ] Pool
RKB 70' I ADL 28334
12. Date Spudded 13. Date T.D Reached 14 Date Comp, Susp or Aband 115 Water Depth, ~f offshore 116 No of Completions
8/28/80 9/30/80 10/12/80* I N/^ feet MSLI 1
17TotalDepth(MD+TVD) 18 Plug Back Depth (MD+TVD)19 Directional Survey I 20 Depth where SSSV set 121 Thickness of Permafrost
l1955'MD/9653'TVD l1910'MD/9618'TVD YES [~] NO [] 2211" feet MD 1900' (approx~
22 Type Electrm or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/CAL. GR/CBL. GR/CNL/CCL; Gyro
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 9/~# H-/~O .~,,rf 1113' 32" -~90 Sx AS
13-~/8" 72# L-RO S,,rf ~nR, !7-!/2" !975 s× Fond,_'
9-5/8" /~7# I.-~o/.~nnqR S,,rf ln~Rn, !2-!/4" 800 sx C!ass C ~ ~00 :.' PFC
7" 29# N-80 10.~¢,0' 119~O' R-1/2" RRB ~x ~r.~-
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Per,for,ated w/4 spf 3-1/2" 10409' 10321 '
11023 ' -11043 ' MD/8943 ' -8958' TVD
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
....
27 PRODUCTION TEST
Date F~rst Production Method of Operation (Flowing, gas I~ft, etc )
N/A
Date of Test I Hours Tested PRODUCTION FOR Oi L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD e
Flow Tubing Casing Pressure 'cALcULATED.~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE "~
28 CORE DATA , ,
Brief description of hthology, porosity, fractures, apparent d~ps and presence of mi, gas or water Sub .
* NOTE: Perforated well 5/21/82. Wor'kover, was perfor,med 3/19/88.
(Dani) WC5/003 JL!', '" '
Form 10-407
Rev 7-1-80 CONTINUED ON REVERSE SIDE ,.~ .~.... ~
29 3O
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUE VERT DEPTH GOR, and t~rne of each phase
Top Sadl eroch~ t 11,136' 9026' N/A
Base Sadl eroch~ t 11,882' 9596'
31 LIST OF ATTACHMENTS
None
32 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
INSTRUCTIONS
General: This form ~s designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1 Classification of Serwce Wells Gas ~njectlon, water injection, steam ~nject~on, a~r ~nject~on, salt
water d~sposal, water supply for injection, observation, injection for in-sltu combustion.
Item 5 Indicate which elevation ~s used as reference (where not otherwlse shown) fordeptk measurements
g~ven ~n other spaces on th~s form and ~n any attachments
Item 16 and 24 If th~s well ~s completed for separate production from more than one ~nterval (multiple
completion), so state in ~tem 16, and ~n ~tem 24 show the producing intervals for only the ~nterval reported
~n ~tem 27. Submit a separate form for each additional ~nterval to be separately produced, showing the
data pertinent to such ~nterval
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for th~s well should show the details of any multiple stage cement-
in~ and the location of-the cementing tool.
ARCO Alaska, Inc. [
Prudhoe Bay Eng~neemng
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
May 3, 1988
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 17-4 Permit No. 80-85
Dear Mr. Chatterton:
Attached is the Application for Sundry Approval
performed on the above-referenced well.
Very truly yours,
detailing work to be
D. F. Scheve
DFS/RAC/jp
Attachment
cc: Standard Alaska Production Company
J. Gruber, AT0-1478
Pi(DS 17-4)W1-3
ARCO Alaska, Inc ~s a Subsidiary of AtlanhcR~chfleldCompany AR3B--6132-C
K(', STATE OF ALASKA
ALAS . OIL AND GAS CONSERVATION COMI~ 31ON
APPLICATION FOR SUNDRY APPROVALS
I Type of Request. Abandon - Suspend -- Operahon Shutdown - Re-enter suspended well -- Alter casing -
T~me extenmon ~ Change approved program ~ Plugging [] Shmulate )~ Pull tubing ~ Amend order ~ Perforate ~ Other
2. Name of Operator
ARCO Alagkm. Inc.
3 Address
P.O. Box 100360~ Anchoraget AK 99510
4 Locahon of well at surface
2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM
Attop ofproductive~nterval
1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM
Ateffective depth
At total depth
2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM
11 Present well condition summary
Total depth' measured 11955 feet
true vertical 9654 feet
Plugs (measured)
5. Datum elevahon (DF or KB)
7D' RwB
6 Unit or Property name
Prudhoe Bay Unit
7. Well number
DS 17-4
feet
8 Permit number
Rn-R~
9. APl number
50--
10 Pool
Prudhoe Bay Oil Pool
Effechve depth' measured 11019
At top perf true vertical 8934
Casing Length Size Cemented Measured depth True Vertical depth
Conductor 110 ' 20" 300 sx Permafrost 110 ' 110'
Surface 2606' 13-3/8" 1975 sx Fondu & 2606' 2606'
400 sx Permafrost II
Production 10680' 9-5/8" 500 sx Class G 10680' 8685'
Liner 1590' 7" 550 sx Class G 11950' 9650'
feet
feet
Junk (measured)
Perforation depth measured
11019-11024' 11024-11029' 11029-11039'
true vertical
8934-8949.8' ,(3 i.ntervals) ....
Tubing (s~ze, graoe an(] measureo oepzn]
3~"= , 9.3#,L-80, PC tubing to 10409' MD
Packers and SSSV (type and measured depth)
~ake= SA~ ~ac~e~ ¢ [032~~ ~ Camc~
12 Attachments Descnpbon summary of proposal
13 Estimated date for commencing operation
May 1988
14. If proposal was verbally approved
Name of approver
Date approved
15, I hereby/~ert,fy~/.e.~..~that.~~the ~true and correct to the best of my knowledge
Commission Use Only
Cond~hons of approval Notify commission so representative may witness I Approval No.
[] Plug integr,ty [] BOP Test [] Locat,on clearanceI
-~p.oroved Copy
....... by order of
Approved by Commissioner the commission Date
Form 10-403 Rev 12-1-85 -- 263-4538 ~ Su~)m,)~(in tr~pl,cate
WELLS2/108 R A sen,
Drill Site 17-4
Proposed Hydraulic Fracture Treatment
ARCO Alaska Inc. proposes the following hydraulic fracture procedure.
1. Replace gas lift valves with dummy valves.
2. Load annulus with fluid.
3. MIRU fracturing service company
4. Pressure annulus to 2500 psig.
5. Pump propped fracture treatment for Sag River zone from 11019' to 11039'
using gelled water and Carbolite proppant.
a. 200 bbl Pad
b. 120 bbl Slurry at 3-14 PPG
c. 111 bbl Flush
6. RDMO fracturing service company.
7. MIRU slickline unit and tag fill.
8. If fill is below perfs, MIRU conductor line unit and run temperature log to
determine fracture height.
9. Cleanout with CTU if needed.
1 0. Flow well to obtain post frac flowrate.
4
:3
1. 5000 PSI ?" WELLHEAD CONN£CIOR FLANGE
2. 5000 PSI WIR[LINE RAU$ (VARIABLE SIZE)
3. 5000 PS~ 4 1/6" LUBRICATOR
4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF
2
H]REL]NE BOP EOUIPMENT
11 I
6
,5
4
2
1. ~;~000PSI ?" W[LLH[.AD CONNECTOR FLANGE
2. 5000 PSI 4 1/16" PIPE RAMS
3. 5000 PSI 4 1/6" HYDRAULIC SLIPS
4. 5000 PSI 4 1/6" SHEAR RAMS
5. 5000 PSI 4 1/6" BLIND RAMS
6. 5000 PSI 4 1/16" STUFFING BOX
C01. LED TUBI. Nt3 UNIT BOP EQUIPMENT
REPORT OF SUNDRY WELL OPERATIONS
1 Operations performed: Operation shutdown ~ Stimulate ~. Plugging ~ Perforate ~ Pull tub~ngX~
Alter Casing ~ Other ~ WORKOVER
2. Name of Operator
ARCO Alaska. Inc.
3 Address
P.O. Box 100360, Anchorage, AK
99510-0360
4 Locahon of well at surface
2486' FNL, 450' FWL, 50c.22, TION, R15E, UN
At top of productive ~nterval
1753' FNL, 1040' FEL, 50c.28, TION, R15E, UN
At effective depth
2176' FNL, 1351' FEL, Sec.28, TION, E15E, UN
At total depth
2176' FNL~ 1351' FEL~ 50c.28~ TION~ E15E~ UM
11. Present well condition summary
Total depth: measured 11955'MD
true vertical 9653 'TVD
Effechve depth: measured 11910 'MD
true verhcal 9618 ' TVD
Casing
Conductor
Surface
Intermediate
Liner
Length Size
80 ' 20"
2606' 13-3/8"
10680' 9-5/8"
1590' 7"
Perforahon depth' measured
11023' -11043'
12.
13.
true vertical 8943'-8958'
Tubing (size, grade and measured depth)
3-1/2", L-80, tbg w/tail @ 10409'
Packers and SSSV (type and measured depth)
5AB pkr ~ 10321' & TRDP-1A-SSA $SSV (~ 2211'
Stimulation or cement squeeze summary
N/A
feet
feet
feet
feet
5. Datum elevahon (DF or KB)
RK~ ?0'
6. Umt or Property name
Prudhoe Bay Unit
7 Well number
8 Approval number
~-107
9 APl number
50-- o29-20~9~
10. Pool
Prudhoe Bay 0il Pool
Intervals treated (measured)
Plugs (measured) None
Junk (measured) None
Feet
Treatment descriphon including volumes used and final pressure
N/A
Prior to well operation
Subsequent to operation
14. Attachments
Cemented Measured depth True Vertical depth
390 sx AS II 1lO'MD 110'TVD
1975 sx Fondu & 2606'ND 2606'TVD
400 sx PF II
800 sx Class C & 10680'MD 8678'TVD
300 sx PFC
550 sx Class G 10360'-11950'MD 8493'-9648'TVD
Alaska Oil & Gas Cons. C0mmissie~
Cop~es of Logs and Surveys Run []
(Workover Well History)
Dmly Report of Well Operations X3
15. I hereby certify that the foregoing ~s true and correct to the best of my knowledge
Form 10-404 Rev. 12-1-85 ~_~
Title Associ ate Engineer
(Dani) SW03/63
Date 4-7-Z~
Submit ~n Duplicate/
Tubing Pressure
RECEIVED
Representative Dmly Average Production or Infection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
ARCO O!i and Gas Company
Daily Well History-Final Report
InltrUCllOnl Prepare and submit the "Final Reflert" on the hrst Wednesday after allowable has been assigned or well :a Plugged, Abandoned, or Sold
"Final Report" should be submitted al~o when operations ere suspended for an mdeflnde or apprectable length of time On workovers when an official test is not
required upon completmn, report completion and representative test data m blocks prowded The "Final Report" form may be used for reporting the entire
operation H space ~s avmiable
I Accountmg cost center code
O~stnct [ eta
ARCO Alaska, ThC. ._.
F~eld [Well no
PRUDHOE BAY FIELD DS 17-4
Auth or W O no
AS1975
Operator
ARCO
Spudded or W O begun
ACCEPT
Date and depth
as of 800 a m
03/19/88
TD:
PB:l1910
SUPV:JS/JH
I County or Parish
NORTH SLOPE - PRUDHOE BAY
Lease or Unit
ADL: 28334
T~tla
WORKOVER
API: 50-029-20498
ARCoWI
22.0000
Date 03/07/88
Complete record for each day reported
WESTWARD RIG 1
Iotal number of wells (achve or ~nachve) on th~s
Dst center prior to plugging and ~
bandonment of thru well
I
our I Prior status ~f a W O
I
0700
RELEASED RIG MW: 8.5 SEAWATER
SERVICED RIG. RIH WITH 3-1/2" COMPLETION ASSY WITH TAIL @
10409', SSSV @ 2211', PKR @ 10321'. LANDED TUBING. TESTED
HANGER AND CONTROL LINES TO 5000 PSI. SET BPV. ND BOPE.
NU TREE & TESTED TO 5000 PSI. PULLED TEST PLUG. SPOTTED
DIESEL CAP IN WELL. DROPPED BALL AND TESTED TUBING TO 3000
PSI AND BACKSIDE TO 2500 PSI. SHEARED SOS WITH 4100 PSI.
SET BPV. SECURED WELL AND RELEASED RIG @ 0500 HRS, 3/19/88.
DAILY:S258,994 CUM:$716,990 ETD:S716,990 EFC:$613,000
Old TD
Released rig
Classd~cations (od, gas, etc )
Producing method
Potenhal test data
New TO
Date
PB Depth
K~nd of ng
Type completion (single, dual, etc )
Official reservoir name(s)
Well no Date Reservoir Producing Interval Od or gas Test time Production
Oil on test Gas aa,
Pump s~ze, SPM X length Choke s~ze T P C P Water % GOR Gravity Allowable Eflec
corrected
The above is correct
Date IT~tle
For form preparat,op//and-dlstrlbuhon'
see Procedures Maifl~al, Sechon 10
Dnlhng, Pages 86 l~d 87
ASSOCIATE ENGINEER
AR3B-459-3-C
Number ell daily well h~story forms consecutively
as they are prepared for each well
DIvlM0~ of Atl~ntlc~'~"~4C.~ml~flY
(
ARCO Oil and Gas Company
Daily Well History--Interim
IltStl~cliolte This form ~s used during drllhng or workover operations If testing, coring or perforating show formation name in describing work performed
Number all drill stem tests sequentially Attach descnpt,on of all cores Work performed by Producing Section wdl be reported on 'lnilrlm" sheets until final
completion Report offlcml or representative test on 'Flail" form 1) Submit "lltteri~t" sheets when filled out but not less frequently than even/30 days, or (2)
on Wednesday of the week m which oll Strlrig is set Submit weekly for workovem and following setting of Oll string until completion
District
Field
ARCO Alaska, Inc.
PRUDHOE BAY FIELD
ICounty or Parish
NORTH SLOPE - PRUDHOE BAY
Lease or Umt
ADL: 28334
State
T~R 17-~~ IWell
no
Date and depth
as of 800 am
03/15/88 (
TD:
PB:ll910
SUPV:RS/DL
03/16/88 (
TD:
PB:11910
SUPV:RS/DL
03/17/88
TD:
PB:ll910
SUPV:JS/JH
03/18/88 ( 11
TD:
PB:11910
SUPV:JS/JH
Complete record for each day while drilling or workover m progress
WESTWARD RIG 1
#1. MU FTA #2. TIH.
DAILY:S28,546 CUM:$313,769 ETD:S313,769 EFC:$613,000
RIH WITH PACKER MILL MW: 8.5 SEAWATER
FINISHED RIH WITH SPEAR. ENGAGED FISH. JARRED TO SET
PACKER. POH. RIH WITH BAKER PACKER MILL. MILLED 2'. POH.
RIH WITH NEW MILL.
DAILY:S28,546 CUM:$342,315 ETD:S342,315 EFC:$613,000
TOH WITH FISH (PKR) MW: 8.5 SEAWATER
CONTINUED TIH WITH SHOE. MILLED PACKER 8'. PACKER CAME
FREE. CIRCULATED & MIXED 40 BBLS HI-VIS SWEEP. PUMPED
SWEEP. TOH WITH SHOE. TIH WITH SPEAR. PUSHED PACKER TO THE
TOP OF THE LINER. SPEARED IN. TOH SLOWLY WITH THE FISH.
DAILY:S29,089 CUM.$371,404 ETD:S371,404 EFC:$613,000
POOH LDDP MW: 8.5 SEAWATER
POOH WITH FISH. LD PACKER, TAILPIPE AND FTA #5. LOAD PIPE.
TIH WITH 3-1/2" DP AND 9-5/8" SCRAPPER. CIRCULATE XYLENE TO
DISSOLVE ASPHALTENES LET SOAK. REVERSE OUT. POOH LD 3-1/2"
DP.
DAILY:S54,222 CUM:$425,626 ETD:S425,626 EFC:$613,000
GIH WITH COMPLETION MW: 8.5 SEAWATER
SERVICE RIG. POOH LDDP. RU CAMCO. MAKE 4 GR/JB RUNS. RU AND
RIH WITH 3-1/2" AB MOD COMPLETION.
DAILY:S32,370 CUM:$457,996 ETD:S457,996 EFC:$613,000
AP9 1 ~
' 2,?,i.e.
The above ~s correct
S~gnature % button
For form preparation and <:~l~tr~
see Procedures Manual Sl~q't~on 10
Dnihng, Pages 86 and
IOate IT~tle
J-3o
ASSOCIATE ENGINEER
AR3B-459-2-B
Number all dally well history forms consecutively
as they are prepared for each well
ARCO OIFmld Gal Company
Welt Hlltollr- InitlM Report - Dally
IlmblmtImie: Prepare and mJbmlt the "hdtlll Re~ml" (m the flint Wednesday ~fler · well la spudded or worKover oporltions ere i~IUle(L
Dilly wow W to aeudding Ih(wld he summarized on the form giving inclusive date. only
District
ARCO Alaska, Inc.
Field
PRUDHOE BAY FIELD
Auth or W 0 no
AS1975
ICo~nty parish of borough
NORTH SLOPE - PRUDHOE BAY
Leale or Unit
ADL: 28334
Title WORKOVER
DS 17-4
/Vell no
API: 50-029-20498
Oporator
ARCO
Spudded or W 0 begun ID&Se IHour
ACCEPT 03/07/88
Date and depth
aa of 800 em
03/08/88 (
TD:11955
PB:11910
SUPV:JH
03/09/88 (
TD:
PB:11910
SUPV:JH
03/10/88 (
TD:
PB:11910
SUPV:RS/DL
03/11/88 (
TD:
PB:11910
SUPV:RS/DL
03/12/88 (
TD:
PB:l1910
SUPV:RS/DL
03/13/88 (
TD:
PB:11910
SUPV:RS/DL
03/14/88 (
TD:
PB:ll910
SUPV:RS/DL
The above IS correct
Signature
For form preparation ap/ii d~stnbutlon
see Procedures Manu~/Secbon 10,
Drllllflg, Pages 86 ano'~e7
0700 fIRS
Complete record for each Day reported
WESTWARD RIG i
IARCO w i
22.0000
Prior status ,f a W O
POOH WITH TUBING MW: 8.6 SEAWATER
ACCEPT RIG @ 0700 HRS 3/7/88. KILL WELL WITH 8.6 PPG
SEAWATER. SET BPV. ND FMC 5-1/2" GEN II TREE. NU AND TEST
BOPS. POOH LD 4-1/2" 12.6% TUBING.
DAILY:S53,877 CUM:$53,877 ETD:S53,887 EFC:$612,990
GIH PU 3 1/2" DP MW: 8.6 SEAWATER
POOH LD 4-1/2" TUBING. TEST RAMS TO 5000 PSI. SET WEAR
BUSHING. PU FTA #1. SLIP AND CUT DRILLING LINE. GIH PU 3-
1/2" DP.
DAILY:S29,050 CUM:$82,927 ETD:S82,927 EFC:$613,000
TOOH WITH FTA 92 MW: 8.6 SEAWATER
TIH WITH FTA #1. BREAK CIRCULATION. TAG FISH @ 10266'. WORK
OVERSHOT OVER FISH . ROTATE K-ANCHOR FREE. TOOH WIH FTA 91.
LD PBR BARREL AND FTA #1. PU FTA ~2. BREAK CIRCULATION.
ENGAGE PACKER. MILL. MONITOR WELL 15 MINUTES. TOOH WITH FTA
#2 SLOW -FISH HANGING UP.
DAILY:S29,450 CUM:$112,377 ETD:S112,377 EFC:$613,000
CLEANOUT 9-5/8" CASING MW: 8.5 SEAWATER
POOH WITH MILLED PACKER. PU HOWCO BRIDGE PLUG. JUNK IN HOLE.
POOH. RIH WITH MILL AND CASING SCRAPER TO CLEAN OUT JUNK.
DAILY:S43,872 COM:$156,249 ETD:S156,249 EFC:$613,000
MU 7" CLEANOUT BHA MW: 8.5 SEAWATER
FINISH RIH WITH 8-1/2" CLEAN OUT ASSEMBLY. POOH. PU 8-1/2"
BRIDGE PLUG. RIH AND SET @ 10300'. TEST CASING TO 2500 PSI
FOR 30 MIN. OK. HANG OFF DP. ND BOPS AND TUBING SPOOL.
CHANGE OUT TUBING SPOOL AND PACKOFF. POOH WITH BRIDGE PLUG.
LD 6-1/2" BHA.
DAILY:S85,325 CUM:$241,574 ETD:S241,574 EFC:$613,000
TIH WITH PKR AND TAIL PIP MW: 8.5 SEAWATER
PU NEW BHA AND DC'S. RIH WITH 3-1/2" DP TO 11365'. CBU. MIX
AND PUMP 50 BBL HEC SWEEP AND DISPLACE WELL WITH TREATED
SEAWATER. LD 26 JTS OF DP AND POOH STANDING DP IN DERRICK.
LD BHA. RIG FLOOR TO RUN PACKER ASSEMBLY. MU BAKER 9-5/8" DB
PERM PACKER AND 3-1/2" TAIL PIPE ASSEMBLY. TIH.
DAILY:S43,649 CUM:$285,223 ETD:S285,223 EFC:$613,000
TIH WITH FTA ~2 MW: 8.5 SEAWATER
TIH WITH PACKER ASSEMBLY TO 9631'. ATTEMPT TO WORK PACKER
THROUGH 9631'. POOH WITH 3-1/2" DP AND BAKER RUNNING TOOL.
NO PACKER. STRAP AND MU FTA #1/ TIH WITH SPEAR. TAG FISH @
9635'. SPEAR FISH. WORKED DOWN TO 9646'. TRY TO WORK FREE.
fiP~AR R~T.~a~n a~n ~T.n ~nT ~ T~ ~T~_ ~nn~ WT~ ~a
l Date [ ~tle
~-,~0-8~ ASSOCIATE ENGI~
AR3B-459-1-D
INumberall daily well history forms consecutively no
as they are prepared for each well I iPage
I
05/0S/87 07:o8 P 1
STATE OF AI,ASKA
ALASKA (.)l l, & GAS CONSF',RVA'rlON
B,O,P,E, lusFec~ion Report
wei _,, D / 7 -
Location: Sec,_._'
Loe-a~ion, Sen~ral:__~ ._.yell
General llousekeeping ~o~.. Rig..
m~d.___S. ,rs ~
Pi~ Gauge
Flow Monitor
,
,
Ga~ De~ec~or~
,
Visual
,,,, ....... ., ....
,
.
Annular Preven~e~_ ..... _ ....
Pipe ~ams .... . ....
Blind Rams__ ...... _
Choke Line Valves_.._ ....
t{.C.E. Valve ....
Kill Line Valves
Check Valve
Audio .......
Test Pressure
--
..........
,..
, , ...
, 11 .~,,- -
Test Results: Fallures_,,..::-... . ...
Repair o~ ReplacemenC'o~ £ailed equipment ~o be made
Co~ission o~ice notified.
ACCUMULATOR SYST~I , '
Full Charge Pressur~_~O.~O ...... p$i$ ....... . ......
Pump ~nc~. elos. p~ez. 200 p~g_.,
Full Cborge Pressur~ Attained:_.
N 2....~ ~,gy. 7 4~ . :_8 ~.~ _:..~ = ---
Con~rol~: Haster ~/ ,- ........- ' ,----
Remo~e / ~linds switch
.... ~ ' ; ......
Uppe~ Ke~l~, ~/ ~esE Fre~sur~
Lower Kc~!y. _~~fcsL Pre~nura~ .~~
Inside BOP__fi/ Test Pressure
Cholc¢ lianifold~%est Pressure
No. Valves __/~
No. flanges 3~ ....... -- '-,--
Adjustable Chokes__ /_ ,-
I!yd r ~.~,c all~e r a t ed choke
days ~nd
,, - ~ ~,i
o=i~, ~' AO&GCC
' cc '- Opera,or
cc - Supervisor
TOTRL P,
-.
, .
·
·
,,
·
·
,
(, STATE OF ALASKA Ji
ALA ., OIL AND GAS CONSERVATION CO ,~SION
APPLICATION FOR SUNDRY APPROVALS
1 Type of Request: Abandon ~_ Suspend ~1 Operahon Shutdown ~_ Re-enter suspended well m Alter casing r-
Time extension ~ Change approved program ~ Plugging ~ Stimulate .~ Pull tubing ~Y~ Amend order ~_ Perforate ._ Other
2. Name of Operator 5.
ARCO Alaskaa Inc. R
3. Address 6.
P. 0. Box 100360, Anchorage, AK 99510-0360 p
4. Locabon of well at surface 7.
2486' FNL, 450' FWL, Sec.22, TION, R15E, UM 1
At top of productive interval 8.
Datum elevation (DF or KB)
KB 70'
Umt or Property name
rudhoe Bay Unit
Well number
7-4
Permit number
1753' FNL, 1040'
At effective depth
2176' FNL, 1351 '
At total depth
2176' FNL, 1351'
FEL, 5ec.28, TION, R15E, UM
FEL, 5ec.28, TION, R15E, UM
FEL~ Sec.28~ TION~ R15E~ UM
11. Present well cond~hon summary
Total depth: measured
true vertical
9. APl number
50-- 029-2049~
10. Pool
Prudhoe Bay Oil Pool
11955 ' MD feet
9653 'TVD feet
Plugs (measured)
None
Effechve depth: measured 11 91 0 ' MD
true vertical
961 8 ' TVD
Casing Length Size
Conductor 80 ' 20"
Surface 2606 ' 1 3-3/8"
I ntermedi ate 1 0680 ' 9- 5/8"
Liner 1 590 ' 7"
feet
feet
Junk(measured)
None
Cemented Measured depth
300 sx Permafrost llO'MD
1975 sx Fondu & 2606'MD
400 sx Permafrost II
500 sx Class G 10680'MD
550 sx Class G 10360'-11950'MD
True Vertical depth
110'TVD
2606'TVD
8678'TVD
8493'-9648'TVD
Perforation depth: measured 11 023 ' 11 043 '
true vertical 8943 ' -8958,
Tubing (s~ze, grade and measured depth)
4-1/2", 12.6#, N-80 @ 10303'
Packers and SSSV (type and measured depth)
Baker SAB nkr (~ 102R7'_ C. amr, n laRI3p-'~-R=I.c~ ~/ ~ 91~1'
12.Attachments
RECEIVED
Alaska Oil & Gas Cons.
Anchorage
Description summary of proposal ~;[ Detailed operations program [] BOP sketch,~
13. Estimated date for commencing operation
March 7, 1988
14 If proposal was verbally approved
Name of approver
Date approved
15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
Signed 4)/~~ .,~J.z~.JL~' Title A§~Q~;i Qte Engi ne~.r Date
Commission Use Only (JC) 5A3/53
Conditions of approval Notify commission so representative may witnessI Approva,
[] Plug integrity [] BOP Test [] Locabon clearanceI
ORIGIN~[ S~qNED BY
Approved by I,,ma~m C. S.~!T,u,
Form 10-403 Rev 12-1-85
Apl3,0ved Copy
Returned
'~-~-~~ Commissioner
by order of
the commission Date
feet
Submit ~n triplicate
PBU DS 17-4
PRELIMINARY WORKOVER PLAN
1) MIRU WWI.
2) ND tree. NU and test BOPE. Pull BPV.
3) Pull and LD tubing, PBR seal assembly.
4) PU drillpipe. RIH and retrieve PBR and anchor.
5) RIH and burn over packer. Retrieve same. Spot pill if fluid loss is
unmanageable.
6) RIH to PBTD. Circulate hole clean. POOH and LD drillpipe.
7) RIH with 3-1/2" tubing, GLMs and packer assembly.
8) Land tubing. Set packer. Test tubing to 3000 psi. Test packer to
3000 psi. Shear PBR.
9) Set BPV. ND BOPE. NU and test tree. Shear pump out sub.
10) Release rig.
Anticipated bottomhole pressure: 3860 psi
Workover fluid: 8.5 ppg seawater
RECEIVED
,F E B 2 ~ !~88
Alaska Oil & Gas Cons. Commission3
Anchorage
DCS/5a
2/23/88
(
ANNULAR
PREVENTER
§
PIPE RAHS
5
BLIND RAHS
TUBING
HEAD
;5
1 13-3/8" CASING HEAD
2 9-5/8" CASING HEAD
3 5000 PSI TIJBING HEAD
4 13-5/8" - 5000 PSI BLIND RAMS
5 13-5/8" - 5000 PSi PIPE PAMS
6 13-5/8" - 5000 PSI ANNULAR
ACCUMULATOR CAPACITY TEST
I CHECK AND FILL ACCUMULATOP RESERVOIR TO PROPER LEVEL
'WITH HYDRAULIC FLUID
2 ASSURE THAT ACCUMULATOP PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGi,~IG PUMP OFF
4 RECORD ON THE IADC PEPORT THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE
BOP STACK TEST
1 FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL
2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
~N WELLHEAD RUN tN LOCK-DOWN 5CREW5 IN HEAD.
3 CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD
4 TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSl AND HOLD FOR i0 MINUTES
BLEED TO ZERO PSI
6 OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE PAMS
~ INCREASE PRESSURE TO 5O.JC, sS: A~D HOLD FOR I0 MINUTES.
8 CLOSE VALVES DIRECTL~ dPSTREAM OF CHOKES BLEED DOWNSTREAr
PRESSURE TO ZERO PSi Tq TEST V~L'/ES TESTPEMAINING L,,~TE~ED
MANIFOLD VALVES. iF ANY WiTM 5(200 PSI UPSTqEAM OF VALVE AND
WITH ZEPO PSI DOWNST~'EAt~ ~,~ ~=~, ~vcT¢~ TO ZERO PSI
g OPEN PiPE PAtd$ 5A,? OFF P~JNN~H~ dY AND PULL OUT OF HOLE
CLOSE ~LI~D - ' '" AhD ~¢ ~ ~-' ~'~ "* . , ~,~'~ ,~ BLE~
~ ~r ~c, . ~c, .~,,'::'0 P ~! FOR ~ 0 ~,,,q~c
TO ZERO
t0 OPEN BLiNDPAMS AND PECOYEP TEST PLUG MAKESUPE MANIFOLD
LINES ARE ~ULL OF ARCTIC DIEb~L AND ALL v~vc~ APE SET IN THE
DPlLLtNG POSITION
t 1 TEST STANDPIPE ~ALVES TO 5000 PSI
12 TEST KELLY COCk S AND ~NSiDE BOP ~0 5000 PSt W',TH KOOMEY PUMP
13 ~ECORD ~'-
, , _3T !NFORMATIOt.~ ,?t.; ~uCWOUT PREVENTER TEST FO~M
AND SEND TO DRILLING SUPERV~SOP
'4, PERFORM COMPLETE BOPF_ ~"-~o~ ONCE A WEEK AND F~JNCT!ONALLY
OPERATE BOPE DALLY
dG NOVEMBER 21.
Post Ofhce Box 360
Anchorage. Ala'.ka~.¢ 99510
Telephone 90(' 7 5637
July 19, 1982
Reference: ARCO CASED HOLE FINAL LOGS
D.S.14-17 5/23/82
D.S.15-5 5/19/82
D.S.17-4 5/23/82
D.S.17-4 5/22/82
D.S.17-4 5/2/382
D.S.18-1 6/21/82
D.S.13-22 6/11/82
D.S.2-22 6/12/82
D.S.2-22 6/13/82
CNL Run 1 5"
CNL Run 1 5"
EPL Run 1 5"
CCL & Perf Record Run 1 5"
CCL for Gas Lift }~nd. Run 1 2"
Diff Temp Log Run 1 5"
ACBL/VDL/GR Run 1 5"
Caliper Log Run 1 5"
Gamma Ray Collar Log Run 2 5"
Please sign and return the attached copy as receipt of data.
Mary F. Kellis
North Engineering
Transmittal # 278
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
PHILLIPS
SOHIO
MARATHON
CHEVRON
EXXON
MOBIL
GETTY
D&M
GEOLOGY
STATE OF' ALASKA'
ARCO Alaska, Inc.~r['
Post Ofhce btox 360
Anchorage Alaska 99510
Telephone S07 277 5637
June 17, 1982
Mr. C. D. Chat Chatterton
Alaska Oil and Gas
Conservati on Commi ssi on
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Re: D.S. 4-11 Permit No. 78-6
D.S. 16-12 Permit No. 81-26
Permit No. 80-85
D.S. 16-4 Permit No. 81-20
Enclosed are our Sundry Notices detailing the work
done on the above-mentioned wells.
Very truly yours,
D. F. Scheve
Regional Engineer
DFS' TKKW.ml c
Enclosures
Distribution: Sohio Petroleum Co.
Oil & Gas Cons
Anchorap'~
STATE OF ALASKA L~.
ALASKA (.,_ AND GAS CONSERVATION C v, MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator 7 Permit No
ARCO Alaska, Inc. 80-85
3 Address 8 APl Number
P,O, Box 360 Anchorage, AK 99510 50- 029-20498
4 Location of Well
2486'FNL, 450'FWL, Sec 22, T10N, R15E, UN (surf)
1753'FNL, 1040'FEL, Sec 28, T10N, R15E, UM (top producing interval)
2176'FNL, 1351'FEL, Sec 28, T10N, R15E, UM (TD)
5 Elevat,on ~n feet (,nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No
RKB 70' I ADL 28334
12
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
D.S. 17-4
11 F~eld and Pool
Prudhoe Bay
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF
(Submit m Tr~phcate) (Submit m Duplicate)
Perforate [] Alter Casing [] Perforations ~( Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludmg estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
Rigged up slickline unit 5/21/82. Ran 3-1/2" gauge ring. Swabbed
well to 1600'+. Rigged down slickline unit. Tested tubing and
annulus. Tested tree. Rigged up perforating equipment, wireline
BOP, and lubricator. Tested equipment, Perforated 11033-43'MD.
Wet gun. Perforated 11023-33'MD with 4spf. Opened well to surge
tank. No flow. Perforated 11028-43'MD with 4spf. No flow to
surface. Ran Packer Flowmeter-Fluid Analyzer log. Could not
detect flow down hole. Rigged down equipment 5-23-82. Secured
well and suspended test.
JUN 2
Alaska Oil & (]as Cons. Co~;~nliss~o
/~,nchora,~e
14 I hereby certify that the foregmng ~s true and correct to the best of my knowledge
The space below for Comm~sston use
Engineer
Date
Conditions of Approval, if any
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" ~n Duplmate
ARCO Alaska, Inc.
Post Ofhce 13o 0
Anchorage, AlasKa 99510
Telephone 907 277 5637
June 17, 1982
Mr. C. D. Chat Chatterton
Alaska Oil and Gas
Conservati on Commi ssi on
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Re: D.S. 4-11 Permit No. 78-6
D.S. 16-12 Permit No. 81-26
, D.S. 17-4'~ Permit No. 80-85
D.S. 16-4 Permit No. 81-20
Enclosed are Completion Reports for work done on
the above-mentioned wells.
Very truly yours,
D. F. Scheve
Regional Engineer
DFS: TKKW :ml c
Enclosures
Distribution: Sohio Petroleum Co.
t £ £1V D
JUN 2 81982
Alaska Oil & Gas Cons. Comm~:~,~,
STATE OF ALASKA ~
ALASK/~I ~ AND GAS CONSERVATION C MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Class.f~cat~on of Serwce Well
OIL[] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc. 80-85
3 Address 8 APl Number
P.O. Box 360 Anchorage, Alaska 99510 50- 029-20498
4 Location of well at surface 9 Unit or Lease Name
2486' FNL, 450' FWL, Sec 22, T10N, R15E, UM Prudhoe Bay
At Top Producing Interval 10 Well Number
1753' FNL, 1040' FEI:, Sec 28, T10N, R15E, UM D.S. 17-4
At Total Depth 11 F~eld and Pool
2176' FNL, 1351' FEL, Sec 28, T10N, R15W., UM Prudhoe Bay
5 Elevation m feet (.nd~cate KB, DF, etc ) 6 Lease Designation and SerIal No
RKB 70' AFL 28334
12 Date Spudded 13 DateT D Reached 14 Date Comp,Susp or Aband 15 Water Depth, ~f offshore 116 No of Complet,ons
8/28/80 9/30/80 10/12/80 NA feetMSLI single
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 DlrectlonalSurvey i 20 Depth where SSSV set I 21 Thlckness of Permafrost
11955 'MD 11910 'MD YES~ NO []I ~, feet MD
22 Type Electric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSlZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 94~ H-40 110' 32" 300SX Permafrost to surface
13-3/8" 72~ L-80 2606' 17-1/2' 1975sx Fondu & 400sx Permfr. II
9-5/8" 47# SOO-95 10,680' 12-1/4' 500sx Class G cmt
L-80
7" 10360' 11950' 8-1/2" 550sx cmt Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
~nterval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 10319' 10284 '
11023'-11028'MD 4spf ~'-- ,.~"
11028 '-11033 'MD 8spf 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
11033 ' -11043 'MD 4spf DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED
8943'-8958' TVD
27 PRODUCTION TEST
Date F~rst Production Method of Operation (Flowtng, gas I~ft, etc )
NA
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO
TEST PERIOD ~
FIowTubmg CasmgPressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press 24-HOUR RATE
28 CORE DATA
Brief descr~pt,on of I~thology, porosity, fractures, apparent d~ps and presence of o~l, gas or water Submit core ch~ps
Form 10-407 Submit ~n duplicate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
29 ~ 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all flu,ds recovered and gravity,
MEAS. DEPTH TRUEVERT DEPTH GOR, and time of each phase
r. Sadlerochit 11,136' 9026'
~. Sadlerochit 11,882' 9596'
31 LIST OF ATTACHMENTS
32 I hereby certify that the foregoing Is true and correct to the best of my knowledge
Signed _,,..~,,.~-,_ -_ / T,tleReg. Engineer Date
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
ail types of lands and leases in Alaska. '
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on th~s form and in any attachments. ~
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
,
· iii
Post Office Box 360
Anchorage, Al~aska 99510
Telephone 9( '77 5637
June 9, 1982
Reference: ARCO Pressure Data
D.S.17-4 5/23/82
Pressure Survey
ase sign and return the attached copy as receipt of data.
Mary F. Kellis
North Engineering
Transmittal # 220
DISTRIBUTION
NORTH GEOLOGY EXXON
R&D MOBIL
DRILLING GETTY
PHILLIPS D&M
SOHIO" GEOLOGY
Mm T ON
CHEVRON
ARCO Alaska. Inc is a subsidiary of AtlanticRichfleldCompany
A!ask3 0~1 & Gas Cons.
ARCO Alaska, Inc.
North SIoF~ strfct
Post Ofhce =ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Jerry A Rochon
D~strlct Operabons Engineer
April 30, 1981
Mr. Hoyle Hamilton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Subject: D.S. 17-1 Permit No. 80-55
D.S. 17-2 Permit No. 80-70
D.S. 17-3 Permit No. 80-77
D.S. 17-4 Permit No. 80-85
D.S. 17-5 Permit No. 80-96
D.S. 17-6 Permit No. 80-132
Enclosed are our Sundry Notices detailing the work to be done on
the above mentioned wells.
Very truly yours, ~
J. ~A. Rochon
District Operations Engineer
JAR/HFB/kam
Enclosures
RECEIVED
MAY-6 1,981
Alaska 0;1 & Gas Cops. Commission
Anchorage
ARCO Alaska, Inc Is a subsidiary of AllantlcRichf~eldCompany
A(._~ STATE OF ALASKA ~j
ALASK .IL AND GAS CONSERVATION C ~IMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL
OTHER []
2 Name of Operator 7 Permit No
ARCO Alaska 80-85
3 Address 8 APl Number
?. O. Sox 360 Anchora§e, AK. 99510 50- 029-20498
4 Location of Well
2486' FNL, 450' FWL Sec. 22, T10N R15E, UM
5 Elevation in feet (~ndlcate KB, DF, etc )
70' RKB
6 Lease Demgnat~on and Semal No
ADL 28334
9 umt or Lease Name
Prudhoe Bay Unit
10 Well Number
p.S. 17-4
11. F~eld and Pool
Prudhoe Bay Field
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit m Tnphcate) (Submit m Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repmr Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w,th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
ARCO Alaska proposes to perforate the Sag River Sand for the purpose of flow testing
and collecting reservoir fluid samples. After perforating and testing the Sag River
Sand, production perforations will be added in the Sadlerochit. The actual perforated
intervals will be given on the subsequent report. All wireline operations will be
run through a5000psi WP BOP/Lubricator, which will be tested to working pressure.
Upon completion of the perforating operation, a SSSV will be installed.
Subsequer, t Work Iteporte/t
on Form No¢~ Dated
MAY - 6 I58t
Alaska 0il & Gas Cops. C0mmJssi0r~
Anchorage
14 I hereby ~[~that t~ correct to the best of my knowledge
Signed //~, T,tle District Operations Engineer Date
Thee spac~e ~ fo__~r Co___m__m_,ss,___on use
Cond~t~onsN5f Approval, ~f any Approved opy
4/30/81
Approved by
ORIGIH,~I. SIr't'4''"
BY LO~,~NIE C. S[~ttTIt
Returned
By Order of
COMMISSIONER the Commmslon
Date
Form 10-403
Rev 7-1-80
Submit "Intentions" in Tmphcate
and "Subsequent Reports" in Duphcate
ARCO Od and Gas Company
North Ala~ DIstrict
Post Off,G_ _,ox 360
Anchorage, Alaska 99.510
Telephone 907 277 5637
Jerry A Rochon
Dmtmct Oporahons Engineer
December 23, 1980
Reference: ARCO Cased Hole Final_t,
D.S. 2-2 10/30/80
D.S. 2-9 11/12/80
D.S. 2-14 11/10/80
D.S. 6Z10 12/15/80
D.S. 6-15 11/22/80
D.S. 14-4 8/23/80
D.S. 14-8 4/22/80
~"~'~ 17-4 ~ 11/12/80
D.S. 17-4 11/12/80
D.5, 17-4 11/i2/80
(
collar log Run 1 5"
collar log Run 1 5"
caliper log Run 1 5"
continuous flow survey Run 1
audio tracer survey
11
continuous flow survey Run 1 5'~ ,_
continuous flow survey Run 1 5"
audio tracer survey Run 1 5"
diff temp log/audio survey/static run Run 1 2"
'~Please sign and return the attached copy as receipt of data.
Mary Kellis
North Engineering
Transmittal #927
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
ENG. MANAGER
D&M
GEOLOGY
STATE OF ALASKA
EXXON
MOBIL
GETTY
SOHIO 1980
MARATHON
Alaska 011 8, Gas Cons, C0mmlssiorJ
CHEVRON knch0rag~
ARCO O~1 and Gas Company as a D~ws~on o! AtlanhcR~chfmldCompany
ARCO Oil and Gas/~" ,mpany
North Slope& ,tnct
Post Ofhce Box 360
Anchorage. Alaska 99510
Telephone 907 277 5637
November 26, 1980
Mr. Hoyle Hamilton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: DS 17-4 Permit #80-85
DS 5-2 Permit #74-36
DS 2-4 Permit #70-17
DS 17-5 Permit #80-96
DS 1 5-10 Permit #80-88
DS 15-21 Permit #80-91
DS 14-9 Permit #80-89
CONFER:
i FILF:
,, ,
Kuparuk
E-7 Permit #80-80
D-6 Permit #79-96
D-7 Permit #79-112
D-5 Permit #79-95
E-4 Permit #80-57
E-8 Permit #80-81
D-3 Permit #79-84
ICO~
COMM
COMM _
! RcS ENG
"" i 2 CNG-'-'._J__ ,
I 4 FNG
~ 1 GFOL
I 2
I 3 oEq ,'f
I ST^T _J
lt)J STAT TEC
'-j
Dear Sir:
Enclosed please find:
1. A completion report, drilling history and a gyroscopic
multishot survey for wells; DS 17-4, E-7, D-6, D-7 &
E-8.
2. A Sundry Notice of subsequent report for wells; DS 5-2,
DS 2-4, D-3, D-5 & E-4. (An updated Completion Report
will be filed, for D-3, D-5 & E-4 as soon as produc-
tion test data becomes available.)
3. A monthly report of drilling for wells; DS 17-5, DS 15-10,
DS 15-21, DS 14-9,.E-8 & D-7.
Very truly yours~ ,
~, P. A. VanDusen
District Drilling Engineer
PAV:sp
Enclosures ,",
Alaska 0,I ,~, ?c Co/)]
/440/,Or a~
ARCO Oil and Gas Company ,s a D~wsmn of AtlanlicRIchheldCompany
Form 13--7
STATE OF ALASKA (See other in-
structions on
reverse side)
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
WELLI I DRYO Other
b TYPE OF COMPLETION
NEW WORK F'-I D~EP- I---I PLUG DIFF
WELLr--~ OVER I I EN I I BACKF] RESER r'-] Other
2 NAME OF OPERATOR
Atlantic Richfield Company
3 ADDRESS OF OPERATOR
P.O. Box 360, Anchorage, Alaska 99510
4 LOCATION OF WELL (Report location clearly and m accordance with any State requirements)*
At surface
2486' FNL, 450' FWL, Sec 22 TION R15E UM
At top prod ~nterval reported below ' ' '
1753' FNL, 1040' FEL, Sec 28, T10N, R15E, UN
At total depth (projected)
2176' FNL, 1351' FEL, Sec 28, TION, R15E, UM
13 DATE SPUDDED8/28/80 114DATE T D9/30/80REACHED 115 DATE COMP, SUSP, OR ABAND10/12/80
18 TOTAL DEPTH MD&TVD 119 PLUG BACK MD&TVDI20 IF MULTIPLECOMPL,
~;~11955' M~ ¢/~E~IT~TM11910' MDI .OWMANY* single
22 PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)*
Top Sadl erochi t 11,136' MD 9026' TVD
Base Sadlerochit 11,882' MD 9596' TVD
5 APl NUMERICAL CODE
50-029-20498
6 LEASE DESIGNATION AND SERIAL NO
ADL 28334
7 IF INDIAN, ALLOTTEE OR TRIBE NAME
8 UNIT, FARM OR LEASE NAME
i P
rudhoe Bay Unit
(' DS 17-4../
10 ~~OOL, OR WILDCAT
Prudhoe Bay Field/Prudhoe
SEC.T.R.M,(BOTTOMHOLE 0il Pool
OBJECTIVE)
Sec 28, TION, R15E, UM
12 PERMIT NO
80-85
21 ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS
all
23 WAS DIRECTIONAL
SURVEY MADE
yes
24 TYPE ELECTRIC AND OTHER LOGS RUN
DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL
25
CASING SIZE I WEIGHT, LB/FT
20" ! 94#
13-3/8" 72#
9-5/8" 47#
26
i GRADE I DEPTH SET (MD) I HOLE SIZE
H-40 I llO'1 32"
L-80 I 2606' 17½"
S00-95 1 106: RO' 12~"
LINER RECORD
CASING RECORD (Report all strings set In well)
I CEMENTING RECORD / AMOUNT PULLED
300 sx Permafrost to surface
1975 sx Fondu and 400 sx [~ermafrost II
500 sx Class G cmt ~
27 TUBING RECORD
SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
550 -- 4½ 10319 10284
TOP (MD) BOTTOM (MD) SACKS CEMENT*
SIZE
10360' 11950'
28 PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
n/a
29 ACID, SHOT, FRACTURE, CEME~NT,,.SQ...UE~E .ZE.,.ET__C-
DEPTH INTERVAL (MD) AMOUNT AN~I~ ~1: ~I'~I'L~R[~L USED
n/a
3O PRODUCTION
DATE FIRST PRODUCTION IPRODUCTION METHOD (Flowing, gas hft, pumping--size and type of pumD)
n/a
I
PRESS 24-HOUR RATE
lOlL
WATER--BBL
GRAVITY-APl (CORR)
31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc ) 1TEST WITNESSED BY
I
32 LIST OF ATTACHMENTS
Drilling history a~d G)//Coscopic survey
33 ~herebycert~fy~t~f~re~ng~n~ttac~i~$inf~rm]at~nisc~np~eteandc~rrectasdetermmnedfr~ma~ava~ab~erec~rdsTITLE DATE //~.
S,aNED~'f4~~/~'~~,,~,. J District Drilling Engineer
rr~
*(See Instructions and Spaces for Additional Data on Reverse Side)
INSTRUCTIONS
General' Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of
lands and leases ~n Alaska
Item: 16: Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements g~ven ~n
other spaces on th~s form and ~n any attachments.
Items 20, and 22: If this well ~s completed for separate production from more than one ~nterval zone (multiple com-
pletion), so state ~n ~tem 20, and in ~tem 22 show the producing ~nterval, or ~ntervals, top(s), bottom(s) and name(s)
(~f any) for only the ~nterval reported in ~tem 30. Submit a separate report (page) on th~s form, adequately ident~hed,
for each additional ~nterval to be separately produced, showing the additional data pertinent to such ~nterval
Item 26: "Sacks Cement" Attached supplemental records for th~s well should show the detmls of any multiple stage
cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on th~s form for each ~nterval to be separately produced (See ~nstruct~on
for items 20 and 22 above)
1ARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS,
WATER AND MUD 35 GEOLOGIC MARKERS
NAME
MEAS. DEPTH TRUEVERT DEPT
)NE
Top Sadlerochit ll ,136' 9026'
~ase Sadlerochit 11,882' 9596'
CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER
NE
DRILLING HISTORY
DS 17-4
API NO. 50-029-20498 Permit No. 80-85
Spudded well at 1430 hrs, 8/28/80. Drld 17½" hole to 2620'. Ran
13-3/8" 72# L-80 csg and landed at 2606'. Cmtd csg w/1975 sx
Fondu + 400 sx Permafrost II to surface. Set packoff, NU BOPE
and test same. Clean out 13-3/8" csg and drill 10' new 12¼" hole.
Tested formation w/12.5 ppg EMW. Drld and surveyed 12¼" directional
hole to 10820' w/no problems. Log w/DIL/SP/BHCS/GR 10801-7000'.
Condition tight hole. Ran 9-5/8" 47# L-80/S00-95 csg and landed at
10680'. Cmtd csg w/500 sxs Class G cmt. Set packoff and tstd
w/5000 psi. Clean out dsg and drill ~" hole to 10690'. Attempt
pressure test formation. Squeeze cmtd 9-5/8" shoe w/300 sxs Class
G cmt. Drill out csg and pressure tested formation to 12.5 ppg
EMW. Drld 8½" hole to 11955'. Log w/DIL/SP/BHCS/GR and FDC/CNL/
GR/CAL. Ran and cmtd 7" liner w/shoe at 11950', top at 10360'.
Cmtd w/550 sx Class G cmt. Clean out liner to 11910' PBTD. Dis-
place well w/NaC1 wtr. Artic Pak 13-3/8" x 9-5/8" annulus. Ran
GR/CNL/CCL and GR/CBL/CCL logs. Ran 4½" tbg and completion assy
w/tailpipe at 10302'. Displace well w/diesel and attempt set pkr.
PBR assy sheared and pkr-tailpipe fell 17' down hole. Restring
into PBR and set pkr. Tested tbg and annulus, ok. Set BPV. ND
BOPE, NU tree and test w/5000 psi. Close tbg sliding sleeve. Rig
lines and begin long term tubing test. Rig released at 2400 hrs,
10/12/80.
Eastman
A PETROLANE COMt~NY
REPORT
of
SUB-SURFACE
DIRECTIONAL
SURVEY
Arco 0il & Gas
COMPANY
D.S. 17; Well No:
WELL NAME
Prudhoe Bay, North Slope, Alaska
LOCATI ON
JOB NUMBER
A880D0479
TYPE OF SURVEY
Directional Single Shot
DATE
9/13/80
SURVEY BY
Jerry Cook
' ~'~" OFFICE
....... ,~ "~Alaska
~I:(CO OIL ANI; GAS
~S 17, WELt. NO.* 4 OSS/MHS/DSS
:'RUD~IOE BAY, NORTH SLOPE, ALASKA
JOB NO~ASOr~0479
COMPUTAI'iON .
lIME r~AI'E
1S:51 ;41 22-0CT-80
-F'AGE NO. 1
...... ]'RUE
qEASURED 0RIF'T DRIFT COURSE; VERTICAL VERTICAl. SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG
DEF'T~I ANGLE DIRECTr~ON LENGTH DEPI'H SECTION TV[; C 0 0 R D I N A T E S DZSI'ANCE 0IRECTION SEVERIIY
FEET D M D F EEl' FEEl' FEE1 FEEl' FEET FEEl' D H DG/iOOF T
O. 0 0 0 O. 0.00 0.00 -70.00 0.00 0.00 0.00 0 0 0.00
479. 0 15 S 8 W 479. 479.00 ~ 1.00 409.00 1.0~ S 0.14 W 1.04 S 8 0 W 0.05
907. 0 15 S ~5 W 428. 906.99 2.85 8~6.99 2.75 S 0.82 W 2.87 S 16 ~9 W 0.0~
1516. 0 45 S 52 E 609. 1515.97 6.95 1445.97 7.52 S 0.11 W 7.52 S 0 51 W 0.1~
2620. 0 45 S 54 E 1104. 2619.87 10.~8 2549.87 16.21 S 11.4~ E 19.84 S ~5 11 E 0.00
2705· ~ ~0 S 27 E 85. 2704.86 11.11 26~4.86 17.47 S 12.50 E 21.49 S 55
tIE IN POINT FOR SDC HMS
2772. 0 0 0 67. ~.~771.85 11.67 2701.85 18.25 S 12.90 E ~.o~ ~5 S ~5 15 E ..~ 24
2865. 0 ~0 S 29 E 9~. 2864.85 11.92 2794.85 18.61S 13.10 E 22.76 S ~5 ? E 0.54
-9¢U.~ ~- I 0 S ~9 E 9~0 2957.84 12.57 2887.84 19.62 S 1~.78 E 2~.97 S 55 5 E 0.55
5051. 0 45 S 24 E 9~, , ~050.8~ 1~+~9 ? 2980,8~" 20.82 S 14,52 E 25,~8 S ~4 5~ E 0.~6
~144. 0 45 S 9 E 9~. ~14~.82 14+~2 ~07~.82 21~99 S 14.86 E 26.54 S 54 ~ E 0.21
~2~7. 0 0 0 93. ~2~6+82 14.84 ~166.82 22.5~ S 14.~6 E 27.09 S ~ ~1 E 0.81
~50. 0 50 S 11 W 9~. ~29082 15.2~ ~"~59.82~ ~.99 S 14·88 E ~7.~8 S ~2 55 E 0.54
$42~. 0 45 S 24 W 9~· ~422.81 16.24 ~552.81 2~.95 S 14.b8 E 28.04 S $1 19 E 0.~1
~516. 0 45 S 26 W 9~. ~515.80 17.46 ~445.80 ~' . '2
~.0~ S 14 06 E 8.7~ S 29 18 E 0.0~
~6090 0 45 S 26 W
~702~ I 45 S 29 W
~795. 2 0 S 29 W
~888. 4 0 S ~1W
~981. 5 ;0 S ~6 W
9~. ~608.80 18.67 ~5~8.80 26.1~.S 1~.5~ E 29.44 S 27 21 E 0.00
9~. ~701.77 20.69 ~6~1.77 27.95 S 12.59 E ~0.65 S 24 15 E
9S. S794.72 2S.72 S724.72 S0.61 S 11.11 E S2.57 S 19 57 E
9S. S887.59 28.56 S817.59 S4,82 S 8.68 E S5.89 S 14 0 E 2·15
9S. S980.27 S6.1S S910.27 41.24 S 4·4S E 41.48 S 6 8 E 1.67
4074. 6 45 S 21W
4167. 8 0 S 20 W
4260· 10 0 S 20 W
4S5S. 12 0 S 2S W
4446~~ 14 0 S 20 W
9S. 4072.74 45.99 4002.74 49.94 S 0.29 W 49·94 S 0 20 W 2.17
9S. 4164.96 57.91 4094.96 61.12 S 4.47 W 61.':28 S 4 11 W 1.S5
9S 4°~ -'
· ~.6 82 /2.4S 4186.82 74.79 S 9·45 W 75.S8 S 7 1~ W 9.1
9S. 4S48.10 90.17 4278.10 91.S0 S 15.95 W 92·68 S 9 5b W 2.24
9~0 44S8.71 111.07 4S68.71 110.76 S 2S.61 W 11S.25 S 12 2 W 2.27
45~9. 1~, ~ S0 S 19 W
46-S2s~ 17 15 S 1S W
4725. 19 45 S 14 W
9S. 4528.65 1S4070 4458.65 1SS.08 S S1.52 W 156.76 S 13 19 W 1.64
9S. 4617.87 160.69 4547.87 158.27 S S8.74 W 162.94 S 1S 45 W '2.61
9S. 4706.06 189.77 46S6.06 186.96 S 45.6S W 192.45 S IS 4~ W 2.71
IRCO OIL AND GAS
Jo., 17, WELL NO; 4 DS
· ';(UDHOE BAY, NORTH SLOPE, ALASKA
JOB NO;ABOD0479
COMPUTATION-
TIME DATE
13;51;41 22-0CT-80
'F'AGE NO, 2
TRUE:
4EASURED DRIFT DRIFI' COURSE VE-'RTICAL VERTICAL SUBSEA R E C T A N 6 U L A R C L 0 S U R E DOGLEG
DEPTH ANGLE DIRECT£ON LENGTFI DEF'TH SECTION TV[; C 0 0 R D I N A I E S DiS FANCE DIRECTION SEVERI1
FEET D M D FEET FEET FEET FEET FEET FEET D M DG/100F
4818. 21 30 S 14 W
4911, 23 30 S 15 W
5004, 26 0 S 18 W
5097, 28 0 S 12 W
5190. 30 0 S 19 W
5283. 32 30 S 16 W
5376, 35 0 S 19 W
5469. 36 30 S 16 W
5562, ~9 0 S 16 W
5655, 41 30 S 16 W
, , , , , 55 225
93 4793 09 222 10 4723 09 218 75 S 53, W ,21 S 13 45 W 1,88
9S. 4879,01 257,27 4809,01 253,20 S 62,46 W 260,79 S 1~ 51W 2,19
93. 4963,46
93, 5046,32 337,68 4976.32 331,29 S 84,44 W 341,88 S 14 18 W 3.65
93, 5127,66 382,33 5057,66 374.70 S 96,48 W 386,9~ S 14 26 W 4.23
~'~ 16 430,~2 51~7,16 420.71S 110,99 W 435,10 S 14 47 W
93. ~07,
93. 5284,48 481.71 5214,48 469.98 S 126,52 W 486,71 S 15 4 W
93, 5359,95 535,70 5289,95 521,79 S 142.86 W 540,99 S 15 19 W 2,48
93. 5433,48 592,24 5~63048 576,52 S 158.55 W 5~7,92 S 15 23 W 2,69
93, 5504,45 651,84 5434.45 6~4.27 S 1/5,11W 658,00 S 15 26 W
5748. 45 0 S 12 W
5841, 47 30 S 19 W
5934, 50 0 S 16 W
6027, 49 30 S 16 W
6120, 50 0 S 13 W
93, ~o72,18 714,70 5502018 696,08 S
93, 5636,49 781,°0 ~ 5566 49 ' 760,77
93, 5697,80 850,77 5627,80~' 827,44 S
93, 5757,89 921,17~ 5687,89 ~ 895,67 S
, ~ ='7 98 964 38
93 5817,98 991,31 ~:.u 47, ._
190.52 W 721,68 S 15 18 W
208.46 W 788,82 S 15 19 W
229,49 W 858,68 S 15 30 W
249,05 W 929,65 S 15 32 W
266.82 W 1000,61 S 15 28 W
4,78
6.06
3,62
0.54
2,52
6213, 49 0 S 15 W
6306, 50 0 S 16 W
6399, 49 30 S 16 W
6492, 48 45 S 19 W
6585, 49 0 S 15 W
93, 5878,38 1061,10 5808,38 1033,00 S
93. 5938.78 1131,16 5868,78 1101,1~ S
93, 5998,87 1201,57 5928,87 1169,3~ S
93, 6059,73 1271,52 5989,73 1236.43~.S
93, 6120,89" 1341,14 6050,89 1303,40 S
283,93 W 1071,30 S 15 22 W
302,82 W 1142,02 S 15 2~ W
322,39 W 1213,00 S 15 25 W
343,53 W 1285,26 S 15 32 W
364,01 W 1553,28 S 1.5 36 W
1,96
1,35
0,54
2,57
3~
6678, 49 45 S 16 W
6771, 48 0 S 17 W
6864, 48 30 S 19 W
6957, 49 0 S 19 W
7050, 48 15 S 18 W
93, 6181,44 1411,08 6111,44 1371,42 S
93, 6242,61 1480,64 6172,61 1438,59 S
93. 6304,53 1549.72 6234,53 1504.57 S
93. 6365,85 1619,45 6295,85 1570.68 S
93, 6427,32 1688.99 6357,32 1636,86 S
382.87 W 1423,86 S 15 36 W
402,77 W 1493,91 S 15 38 W
424.21W 1563,23 S 15 45 W
446.97 W 163~.04 S 15 53 W
469,11W 1702,76 S 16 0 W
1.15
2,05
1.69
0.54
1,14
7143, 48 0 S 19 W
- 7236¢-'~ 47 30 S 12 W
7329, 47 30 S 11W
'7422, 48 0 S 12 W
752'5, 47 30 S 11W
93, 6489,40 1757,99 6419,40 1702.53 S
93, 6551,93 1826,16 6481.93 1768,83 S
93, 6614.76 1893,28 6544,76 1836.02 S
93, 6677.29 1960.67 6607.29 1903,47 S
93. 6739.82 2028.06 6669.82 1970.93 S
491,09 W 1771,94 S 16 5 W
509,47 W 1840,74 S 16 4 W
523,14 W 1909,09 S 15 54 W
536,87 W 1977,74 S 15 45 W
5~0,59 W 2046,~9 S 15 36 W
0.84
5.60
0.79
0.96
0.96
~RCO OIL AND GAS
'iS 17, WFLL NO: 4 DSS/MMS/DSS
· 'RUDHOE BAY, NORTH SLOPE, ALASKA
JOB NO;ASOD0479
COMF'UTATION -
T I ME [iA T E
13; 51 .' 41 22-0CT-'.80
'PAGE NO, 3
..... TRUE
tEASLJRElq I)RIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG
DEPTH ANGLE [ilRECI'ION LENGTH OEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE OIRECTION SEVERII'Y
FEET r_; M I) FE'ET FEET FEET FEET FEET FEE F 0 M r~G/iOOF l
7608, 48 0 S 11W
7701. 47 0 S 10 W
7794, 47 0 S 24 W
7887, 48 0 S 21 W
7980. 48 0 S 21 W
8073, 48 0 S 17 W
8166, 48 0 S 17 W
8259, 49 0 S 17 W
8352. 49 0 S 13 W
8445,' 49 30 S 1~ W
6802,35 2095,33 6732,35 2038,51 S
6865,18 2162,19 6795,18 2105,93 S
6~28,61 222~.63 6858,61 2170,81 S
69~1,44 22~8,18 6921,44 2234,15 S
7053,67 2~67,24 6983,67 22~8.67 S
93. 7115,89 2436,15 7045,8~ 2364.01S
93. 7178.12 2504,84 7108,12 2430,10 S
93, 7239,75 2574,08 7169,75 2496,71S
93, 7300,76 2643.52 7230,76 2564,4~ S
93, 7361,47 2713,37 7291o47 2632,18 S
563,73 W 2115.02 S 15 28 W 0,54
576.22 W 2185,34 S 15 18 W 1,34
596,06 W 2251,16 S 15 21 W 11,00
622.30 W 2319,20 S 15 34 W 2.61
647.06 W 2588,01 S 15 43 W 0.00
669,56 W 2457,00 S 15 49 W
689,77 W 2526.09 S 15 51 W
710,13 W 25~5,73 S 15 53 W
728,29 W 2665,90 S 15 51W
747,70 W 2736,32 S 15 51W
J"'~O
0.00
1.08
3.25
4.92
8538. 49 30 S 26 W
8631, 50 SO S 18 W
8724. 50 30 S 19 W
8817. 51 0 S 16 W
8~10, 52 0 S 17 W
7421,86 2784,04 7351.,86 2697,48 S
7481.64 ~855,21 7411,64 ~ 276~o48 S
7540.80 2926,72 7470,80 2831,53 S
7599,64 2998,~6 7529,64 2900,21 S
7657,53 3070.6~ 7587,5~ 2969.99 S
774,75 W 2806,53 S 16 i W
801,41 W 2877,34 S 16 ]0 W
824,18 W 2949,04 S 16 14 W
845,84 W 3021,0~ S 16 ~6 W
866,51W 3093,81 S 16 16 W
5.72
6.67
0.83
2.56
1.37
9003. 53 $0 S 16 W
9096, 55 30 S 16 W
9189, 57 0 S 20 W
9282, 57 15 S 22 W
9~75, 57 0 S 23 W
7713.82 3144.14 7643.82 ~040.97 S
7767,83 3219,24 7697,83 3113.7~ S
7819.49 3296.22 7749.49 3187.27 S
7869.97 3374.25 7799.97 3260,18',S
7920.46 ~ 3452.35 7850.46 ~$32.34 S
887.53 W 3167,84 S 16 16 W
.. 55 S 16 16 W
908.40 W 3'~43.
932.29 W 3320,82 S 16 18 W
960,28 W 3398,66 S 16 25 W
9~0,17 W 3476,33 S 16 33 W
1.83
2.15
3.92
1.83
9468. 57 30 S 22 W
9561, 57 15 S 17 W
9654, 57 30 S 13 W
9747, 56 0 S 15 W
9840, 56 30 S 16 W
7970,77 3530,55 7900,77 3404.60 S 1020.10 W 3554,14 S 16 41 W
8020,91 3608,69 7950,91 3478,41 S 1046,24 W 3632,35 S 16 44 W
8071.05 3686,19 8001,05 3554,0& S 1066,51 W 3710,63 S J6 42 W
8122,04 3762,94 8052,04 3629,52 S 1085,312 W 3788,~1 S 16 39 W
8173.71 $839.55 8103.71 3704.03 S 1105.99 W 3865,62 S 16 38 W
1.05
4.54
3.63
2.42
1.04
9933. oo 0 S 16 W
~-~-
10026. a~ 0 S 15 W
10051, 54 0 S 14 W
93, 8226,04 5915.80 8156.04 3/77.92 S 1127.17 W 3942,49 S 16 37 W
93, 8279,39 3991,28 8209,39 3851,33 S 1147.53 W 4018,66 S 16 $6 W
25. 8293.90 4011.39 8223.90 3871.04 S 1152.63 W 4038.99 S 16 35 W
1.61
0.88
5.16
I'IE--IN~"F'OINT FROM SDC MMS TO E/W DSS
· ~F¢CO OIL AND GAS
I~S 17, WELL NO: 4 DSS/MMS/f_~SS
r:'RUDHOE BAY, NORTH SLOPE, ALASKA
JOB NO:ABOD0479
COMPUTATION ~ ' 'PAGE NOo
TIME DAI'E
13:51:41 22-0CT-80
~ ~ TRUE
'IEASURED 'DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N 6 U L A R C L 0 S U R E DOGLEG
DEPTH ANGLE OIRECTION LENGTH DEF'TH SECTION I'VD C 0 0 R D I N A T E S [;ISTANCE DIRECTION SEVERIT1
FEET D H D FEET FEET FEET FEET FEET FEET D f4 DG/iOOF]
10235, 49 30 S 23 W
10260, 48 0 S 24 W
10324, 47 0 S 26 W
10386. 48 0 S 27 W
.[0552. 49 15 S 27 W
184, 8407.79 4155.20 8337,79 4007°89 S 1198.42 W 4183,23 S 16 39 W
25, 8424,27 4174,00 8354,27 4025,13 S 1205,91 W 4201,89 S 16 41 W
64. 8467.51 4221,16 8397,51 4067.89 S 1225.85 W 4248,58 S 16 46 W
62. 8509,40 4266.80 8439.40 4108.80 S 1246.25 W 4293,64 S 16 52 W
166, 8619,12 4391,10 8549.12 4219,79 S 1302.80 W 4416,32 S 17 9 W
4.55
2,78
2.00
0,75
10810, 47 45 S 31 W
11061. 39 15 S 40 W
11164, 37 0 S 42 W
11288, 39 30 S 41 W
.[1581, 40 15 S 39 W
258, 8790,07 4583,33 8720,07 4388,75 S 1396,46 W 4605.56 S 17 39 W
251, 8971.97 4751,86 8901,97 ~ 4529,14 S -1496,60 W 4770.00 S 18 17 W
103. 9052.99 4812,43 8982,99 4577.12 S 1538.31 W 4828,71 S 18 35 W
124. 9150,36 4885,35 9080,36 46~4.61 S 1589,18 W 4899.50 S 18 56 W
293. 9375.22 5065,24 9305,22 4778,51 S 1709.91 W 5075,2~ S 19 41 W
~o
4.18
2.49
2.08
0,51
-FINAL CLOSURE - DIRECTION~
[~ISI'ANCE;
'\
;;; Eastm. an
Wh,ps toc k
P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 34~4617
TWX 910-881-5066~Cable: EASTCO
October 22, 1980
Arco 0il & Gas
P. 0. Box 1479
Anchorage, Alaska 99510
Well Number: D.S. 17, Well No: 4
Location: Prudhoe Bay, North Slope, Alaska
Type of Survey: Directional Single Shot
Date: September 13, 1980
Method of Computation: Radius of Curvature
Surveyor: Jerry Cook
Job Number: A880D0479 j
ATTN: Bob Hines
Dear Mr. Hines,
I am enclosing the original and one copy of the
Directional Single Shot Survey run on the above men-
tioned well.
We wish to take this opportunity to thank you
for calling on our services and trust that we may
continue to serve you in the future.
Sincerely,
~is :r~i~a~erations Manager
cc: file
enc.
JT/cfw
D~rect~onal Dnllers/Sul:~urface Surveyors/Instrument & Tool Rentals/Sales/Worldwide
ARCO OIL. AND GAS
DS 17, WELL NO; 4 DSS/h~4S/DSS .JOB N[J;A800047¥
PRUDHOE BAY, NORTH SLOPE, ALAS~{A
DSS, 0-.2705 MD, DRILL.ER;
I~MS, '2772-10051 hD, SURVEY BY SDC, DATE RUN; 13-SEP-80
DSS, 10235-11581 h[~, DRILLER; .J CO01~
VERTICAL SECTION CALCULAI'ED IN F'L. ANE'O~.. F'RO'F'OSAI~ > ~,.~i~~' ,.~
DIRECTION; S 2~,, DEE;° 17 MINo I,,.!
RECORD OF' SURVE;Y
RADIUS OF CURVAYURE i~'iEI'HOD
-- ",/'~' I, .... J ' ~ ' -t------~, ' '!' ~ ~,-e-.. - 'l.i _ ,~---~-I ..... ' ~--~--~"
~ ..... RCO OIL-- GnS .... -t ....... ............. ..... , -- -HORiZON ROJECTi iN'-
_:'~ ...... ~RUDH~OE--BRY~-~ORTH :SLOpE~--- RLRS~_~_- [-- -:~.~-:-~'-:. .,:~~~:I~_IC[ I~R: ]:VD :7'--r~
.... ..... ..... ...... ....... ..........
__.~ ....................................... ,. ........................... ~.~-
-~ ~ ',~~~_~HIP ~ -~-I' i ..... ~_~_~$~ ..... ~ ...... ~ ...... ~ ................ ~-~-.-~-~+~ ~ ~
i ~ I , 1- ~ , ~ , , ~ , , ,
....... ~_~ .......... ~_~_~_ . ~ ~ _~_~.~ __;_L. ; ~ ~ I
_~_, . ~[_~ ...... ]__.~+ --~--~ ............. ~ .......... ~-~-~--~-t'4-~ '-'- '' ' ..... '! ~'. :.~ ~
", , ~ ~ ,"i~ , ~ '', ~ i ~ ~ ~' ' ' ~ , .... 'L.-~- ~-~ ....... +-~-~ .... ~-, .............. ~ ........ ~: -~
-.-~ ~ ~ ~. ~ , ~~-~~-~-~--~--~- ........... ~ -~--~ ...... ~--~-= --~--~ ~ .... --- ~ ..... ~ ........ ,-~+-~---~-~ ~ ~ ;-~
~-L.-~-~-] ~ ~ : ~ i--~-~-~.-~-~ ..... ~ ........ ~ ....... ~-~ ~--~-~ .... ~-~i ..... ~ ..... ~ ......... --~ ....... ~ ~ I ~ ' I
-4-~-.-~--~.p-~-~-~ .... ~ ..... k-~-~-~---~-~-~-~--~-~-~ .... ~-~-'=~ ~ ' ' ' ' : - ' ' : ' ' ' .....
~ , , , ~ ~ ~ ', ~ ; , , , f,'~ . ' ' ~ . _ ', , ,, ~ ~ I [ , I ',,~ '
---~ ...... , ........ I ~-~--~--,-, ~-~ ....... I ............... ,,
__: , ,; : ~--: , , ,~. ~-~ ~ ~ ....... ~~_~.__~_~, ~-~- ......... ~__ ~.-~---~ ......... , . -
~--~ .................. ~ -~-~-~.~--~-.~ ................ ~- ~ .~-=---~,~i~! a ..... ~-~-~-,-.--.. ........ L~--~ ..... ,--~-~ ~-
. , ., , , ...... , , , , ,, ~ .,. , ,, ;, ; ; 4,.8_ , n ,, , , , .
. , . : , ,,, , , , , , ' , ~ , , , ~ I I ~ ~, I i ~ ~ ~ --: : : · ' ~ ' ~ -'.'"~ ~ :
--~. I I i j_ ~-~.._-~--~ ~-~-J', i ! -- ~-~-~--~;--~-.- / .' ~' ' ~ ~~ ~-~. ~-~.~ - ~, ~ ~ ~-~- M~ ~- ~--~-- ,// I t .' l
- I i ~ i J i ~ ~ . , ~ , , i :' ', ~ ~ ~ ' ' I I , , I ~ '. i ~ . I ' ~ ~ , . ~ , ~ , ~ ; I ._ '. I , ', !~ I
~.--; ~Ii ~-9-~-~, ; ~F~;-,~-~ .... ~--%--~ ' ' .... '' '
.......... ~ .... ,-..~OMI .... ~ ...... ~-¢ ...... ~ ......... ~-~,--, · . I .
..... ~ ~--~w4--~-~[- - ~-~ ....... ~ ........ t-~ ...... -~r~ .... ~-r ~ -~ ; i T-
H-p-~9~--~-?--r-=-~ .... ~_~._~ ....... ~ ..... ~¢ ....... , ~ ~ . , .....
~ , · ' I ~ ' "'*"'~ ~ : ' · i t : i t . , ! j . , , , ; , , :~,, ~ , . , , , , J ; , : ~
-i t l -.. ~ -~ i~- I -~4: ~-~~ ........ ~ ~ q ? ~;~a~-~= .... ~-;~-~~ ~ : ;-~-~ ~
I i i ~ I ! ~ : '. ~ ! [ ~ i ~ : [ i I ~ ~ I I [ ~ , ~ ~ ~ ~ ' i I. ,, ~ ' t' ~ ~ ~ , ~ '
~ ', '. ~'~--'- ~- ' : ~ .... . ' , , ', ; ~T~--'~ ' ' ~ ~--~r .... ~ ~ ; ~ ., '-f I ~ ~, ,' r~ ; ~ i
· ~ ; i ' ~ ~ I t , I ; ! t , ~ I . · ' , i , ~ , , : , . ~ r ' ~ , I ~ , -- , , , , '
- --~ -~ -r ..... ~~--r--~-- ~-~- --~--~ .... ~- ~--t ......... ~ ....... ~ 1 ....... . -~.~ --k_~ -,-- ,-~ .... ~-~ ..... k ~ ..... 7--~ ..... ~ --I 'I ...... ~ :-
~ , ~ I i ' ~ ' , ~ , ~ . ~ j / ~ · , * ', ~ , ~ i , ~ i I
, . I ' ; ' ~ ' ~ ' · ' / ' , ~ , ' ~ , ' I
' ' ~ ' I ~ ' ~ / ~ , / ~ , , j ,
' ; ; ~ '" ' ' ~ /' -' ', ' ~} ..... ~ · ' ' , , ' , ' ' , ........
', , ' . ' ' I ~ ~ , I ' , ' , , i ~ ,
~-~-~ ..... ~-~ ..... ~F~ ~ -~ ...... ~ ......... ~ .............. ~ - +~-.-~ ~-~-I- --~.~-~- ~-~ -~- -~ ....... *- ~ -~ ..... t-~-~ -m '
---~-= ...... ~ ..... ~'~:--:-~-+-t .......... ~ ....... ~ ............ ~ ~, .... ~ ...... ~--~-~ ............. ~-~ ......... ~ + ....... =--~--
~ ' ' ' ' ~ ' t , , , ' i , ,
' ' ' ~ ~ ........ ~., ~ ' .' ~" ~ ' : .... I ' , .~' ' ~ ' ~ ...... ~ '. ~' ~ ~ : ~ ' ' : : ~ ; - ~ ' ~
.... ~. ~ --~-~~-~ ~ ...... ~ .... =~_~.~ ._.~ .... /____~. _; .......... ~_ ~-~ ~ .... ~_~&_~ ._~ ..... ~_~. ~ _ ~ ....... ~ _
._ , ' ~ I ~~ , I I ~ B , I I I_~ ~ _ ~, ~ , j ~~ , , ~ ~ , , , r ; , , ' ' i ' , _
- ! ; i i ' ; ~ I i '' : '' !~ :ii:1';I''/'''/1 r, ' f/ : I'' ' 'ii! " .... iii ' : ; : i : i~ ' : ' ~'
- ~-~ ..... ~--.~--~--~m ...... 4-., ~ ~ ', ..... 4_L-_~ .... ~-~40 --' . 4-~-~ .... :_ '_~ ..... ~_=._~._L_~ ..... L_; .... ~;- '.-i .-~- -~
~!- ~- ~,=-~--~-~ ......... ---~.~ .... ~ ........ ~ ....... /-:': .... ~-+-I ........ ~ ........ - ...... ~ -~ ........ ~.-. ...... , ........ ,~ - -~--
- ' t , . ' ' ~ ' 'l ' . . _ ~ , ~ . ~ , i ~ : ~ , i . , , . , , , i , , , 4 ~ I '
-.~-~ .... ~ ....... - ....... ; ! -~-I~., ~,~/ ..... ~~-~-~ . !. ~- . , ~. ~ ! ~ , t
--~ ,,. .... ~ ....... ~-~~-~--~---,~---k--~78~,-~ ~-~ .......... i ........... ~+~ ........ ~-~ ~ ~ ~
-..--~ .... ~-~-~ ..... ~ ............... ~-~-. ....................... i/~;'- -]- ~ ...... ~- ~ .............. ,-., ............... ,--+- ~---.+ .......... ,-.-~ ........ ?-.
; ' , ~ ~ ' ' , tt' . ~ .... I~ ,, , ' , , ' , , , , '
~ ~-~--~-~-~ .......... * ~ ~ .......... ~ ~- ,- !~ ~+-~ ...... ~~ .......... ~ -~---~ ..... ~-~--~- 4- ~-~- ~ ~-~-4~ · - ~.- - ~ ~-~-- ~ ~ ..........
- ' ' -~-~ ~ ...... ~-: .... 4-; i., ~-.~t-.~ ..... ~ .... ~ ......... ~-.-~--~--;---~;-.~ .... ;--~~-/-~= .... ;--~ ~
. : ' ~ ~ ...... I. I : ....... : , . :. , i , ; ', . ,
-~ , ~ ..... i ............ : ....
-~-F~--~-~ ~-: ................. ~--;-4 ..... = ....... t: .... ~ ........ : ........... ~- --;-~+ -~ ......... =~ ..... :-- : ,-~-~ .......... ~--
. i ~ ' ~ : ~L . : i ~ ~ ~ ~ ~ ~ I : i ~ : , ' ,
................................. ~ .... ~ ........ / .... ~- ....... ~ ......... ~ ...... ~ ............................
--,. ' . , ., j~_ 1_ ' ~' ' , ' , ,
~ * , , · , . . . ~ , ~ ~ . , . ~ ,. ~ ~ ,, ~ , ~ , ,, ~ .... , ......
, t , ~ ' ' I , ' ', ' , I ' ' ~ ', ;
.... ' 4_!__~ .... i_ , ~ ' 4 f , / _ I. ~ , ; ' ~ , -- ...... !
i ~ J ; .... [ '~-% ......... % .... %-,--r- ~ ..... ~ .............................. r F ........ T-i--~- ....... ~ ....... ~ ................. - ........
~ Z.~; ' ' ' ' ' , ......... ~ ..........
r - ~ ~ .................. :__~ ._~ ...... ~._.; . _~__~_~ _+~ ~,
~ , ~ ,- ,,-~,, ~ , . I ,III I~rl II1 I I I I t ri
' ....... ~ ~ ' ~.. ~ ....i . "' , i-~.T~ -~-~'~~ .... , F t-t~= ..... I 't'-i ~ 1 .......... ~ ~ I ' i ~ .~ ~ ,~
..... ~ J ' ' ' ,i ~ , ' ' ~ ~ - , .........
~_ ._~._~_~__ ~_..~, ~ .... ~_ ~ ~ , ~.~ , _ ~ ~_ . _ i _ _~ ' , ' J ~ ~ t . ·
~ ; r ' -- , ~ ..... , -'-~ '-*-~; .... r~t ...... TT-I ........ - i : -'- r~'T-~' -i'q-"l-~-' ~'~
ISTDSS
.5469
Eastman/.
~ Whipstock l
A PETROLANE COMPANY
REPORT
of
SUB-SURFACE
DIREC TiONA L
SURVEY
Arco 0il & Gas
COMPANY
17, ,Well No: 4
WELL NAME
Prudhoe Bay, North Slope, Alaska
LOCATI ON
JOB NUMBER
TYPE OF SURVEY
DATE
i A1080G0079 r~r~ ~,~r,,'~-'' ,',, '
Eastman
Whip s t qc c k
(
P O. Box 4-19?O/Anchorage, Alaska 99509/(907) 349-4617
TWX 910-881-5066/Cable: EASTCO
November 14, 1980
Arco 0il & Gas
P.0. Box 1479
Anchorage, Alaska 99510
Well Number: D.S. 17, Well No: 4
Location: Prudhoe Bay, North Slope, Alaska
Type of Survey: Gyro Multi Shot
Date: October 28, 1980
Method of Computation: Radius of Curvature
Surveyor: David Pef£erkorn
Job Number: A1080G0079
ATTN: Bob Hines
Dear Mr. Hines,
I am enclosing the original and one copy of the
Gyro Multi Shot Survey run on the above mentioned
w~ll.
We wish to take this opportunity to thank you
for calling on our services and trust that we may
continue to serve you in the future.
Sincerely,
Gene Rutland
District Surveyor
Alaska District
cc: file
eno.
GR/cfw
D~rect~onal Dnllers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide
OIL ANB GAS .............
17~ WLI. L NO: 4 GMS JOB NO; AJOSOGO07?
10[' BAY, NOR7~I SLOPE~ ~LDSNA
~ 00- 11800 MD ~ SURVEYOR ~ D. F'gFFERKORN DATE RUN: 28-0CT--80
~G AZ~ NO~ 11~0, 12 DEG A/U NO~ 78V~ GYRO NO: ~06, 27~
I~A NO~ J186, JOe5
I,:¥]C,]L ':,[Cflt.~N CALCUI_ATED IN F'tANE OF F'ROF'OSAL
DIRECTION: S 23 BEG, 17 MINo W
RECORD OF SURVEY
RAB1US OF CURVATURE METHOD
AND GAS ,
L'L.L NO¢ 4 GMS
BAY, NORTH ,:.LLFE, ALASKA
,JOB
COMF'UTATION
TIME ---'-- DATE .....
14;50;09 14-NOV-80
F'ADE NO · ·
TRUE -- _
i~r(IF'T DRIFT COURSE] VERTICAL VERTICAL SUBSEA R E C T A N O U L A R C L 0 S U R E DOGL[
ANALE DIRECTION LENGT;~ BEF'.I'~; SEC]ION TVD C 0 0 R D I N A T E S DISTAUCE B]REC]]ON SEVER]
I~ M D F£ET FEET FEET FEET FEET FEET D H I;G/100
0 0 0 O, 0.00 0.00 -70.00 0.00 0.00 0.00 0 0 0.0~'
0 0 0 100. 100,00 0.00 30.00 0.00 0.00 0.00 0 0
0 Jr', S 16 E 100. 200.00 0·17 130.00 0.2J S 0.06 E 0.22 S 16 0 E
0 J~,, S -'"., W 100. SO0.O0 n.~6~ "~30+00 O.~
..... ,~ S O.J4 W 0.56 S 14 J$ W 0,3c
0 0 0 100. 400.09 0.68 S30·00 0.59 S ~' 0·~5 W 0.69 S 30 30 W
0 15 N 32 E 100· 500.00 0·47 430.00 0·41S 0·23 W 0,47 S 29 49 W
() 15 N 50 E J. O0. 600.00 0 05 ~'~ 0
- · ,,o0 O0 0.08 S 0.05 E 0.10 S $1 46 E 0o0~
0 ~0 S 55 E [00. 699.99 -0.21 629.99 0.05 S 0.66 E 0.66 S 85 15 E 0.5(
0 ~5 S 4 E 100. 799.99 O·J7 779.99_. O.6J S 0·97 E 1.1~, S 58
0 15 S 24 W JO0. 899.99 0·59 829.99 1.03 S 0·90 E 1.~7 S 40 59
0 0
'~0 S 59 E
7,0 S 33 L'
-,(~ ,,¢' 70 E
100. 999.99
100· 1099.99
100· JJ99·99
100· J299098
100. 1399.98
0·" 929
ol ·99
0·87 1029.99
1,]8 1129.99
1,40 1229·98
1,57 1329.98
1.23 '~
o 0·81 E 1.47 S S3 J9 ~ 0·°~
1.46 S J.18 E 1.88 S 39 6 I'; 0.5~'
2.06 S 1.81 E 2.74 S 4J 17 F 0.2.
2,59 S .":'.48 E 3.,,58 S 43 43 [' 0.3,
3.17 S 3.7,9 [_' 4.64 S 46 54 r. 0.3,
0 SO S .'-';9 £'
0 SO S 88 E
0 15 S 32
0 30 S 57 E
0 45 N 46 E
2 0 N 27 E
I 45 N 19 E
I 0 N SO E
1 0 N 48 E
0 45 N 78 E
0 -1.5 S 73 E
I 0 S 62 E
J 0 ~ 4~ E
0 45 S 25 E
045 S ]7 E
100. 1499.97
100. [599.97
[00. 1699.96
100. 1799.96
100. J899.96
100. 1999·95
100. 2099·87
100. 2J99.U4
100. 2299.83
100. 2399.82
100. 2499."
o 1
~00. 2599.80
100. 3699.78
J00. 2799.77
100, 2899·76
1,85 1429.97
i · 75 1,~.-9.9'7
I · 82 :16 '29 · 96
2.07 1729o96
_,_, 1 ~.,. , .96
- O. 74 1929. oS
-4.02 2029~87
- 6.41 2129.84
-- 8.08 2?.29 · 83
--9 · .24 o-~'~o 82
-9.70 2429.81
-9.73 2529·80-
-'9.~0 ~'o 78
'-~·48 . ~729.77
-7·54 2829·76
;5.84 c.; 4.:'!5 E '::" 73 S 47 5--' L o.''~
4.09 S ~' 07 E 6o51 S ~'~1 e E 0."'
4,40 S 5.62 E 7.14 S 51 gA E- 0o4f
4.87 S 6,07 E 7.78 S 51 19 E 0.2'
4.77 S -- 7.08 E~ 8.54 S 56 2 E O.Ew~
2.85 S 8.50 E 8.97 S 7] 29 E' J.3~
0·16 N 9·78 E 9.78 N 89 2 [:. 0.3,
2.34 N 10.77 E 11.02 N 77 44 E 0.7c
3.69 N 1].87 E 12.45 N 72 42 E 0.3~
4.38 N J3.21E 13.92 N 71 40 IZ 0.5
4.~2 N :1,4·~'0,~ E 15.13 N 73 24 E O,'~'
3,74 N ]5.91 E-- 16,55 N 76 46 E
Z,68 N 17.29 E 17.50 N 81 lJ E O,S
1,42 N 18,J. 4 E 18,20 N 85 31 E 0,3-
0,20 N 18~61 E- 18,61 N 89 2J E 0~1~
l AND GAS
WFLI. NOI 4 GMS
BAY, NORTti SLOPE,
ALASKA
D IIR [F"~ ORIFT COURSE-"
ANGLE I~IRECTION LENGIH
I; M D FISET
TRLIE
VERTICAL
DEPTH
F [: F T
0 30 S 34 E 100.
0 ?~0 S .43 E 100,
0 :<0 S 49 E 100.
,-' ,> I.- ] O0.
0 30 S 30 E lo0.
2999.75
S099.75
S199.75
3299.74
~399.74
3499.74
~:~.~
~,,~.73
'379V.69
3899.53
6
0 S 29 W 100.
15 S 24 W 100.
0 '-; 2] Y I00.
lt', ':. ,:0 U 100o
:499° 14
4098,,47
4197.46
4295~90
439S. ~: ~
JrI
19 0
2] 45
2J~ 45
S ]o W
S 14 W
S 12 W I00.
e 1o W 100.
S J4 W 100.
4'190. S9
4586.51
4681 . 61
4775.35
26 15
27 SO
31 ['--
.j
37. 0
J6 0
S [4 W J 00.
S 11 W 100.
S 13 W 100.
S 12 W 100.
S 12 W 1 00.
495° ~ 9
5047.38
· .... ] ]~4.5:1
~'~ '" 2'0
,..301.60
42 0
4 5 0
47 45
50 0
S 11 114 JO0.
S II W 100.
E~ 11 W J. OO,
S 10 W lO0.
S 9 W 100.
.,o81.19
5457.50
5599.02
5664.79
JOB NO~
VERT] CAI.
SEC'f I ON
I"EET
-6~I~3
-6.41
--6.10
~ 78
= 36
-4.78
--4.09
-3.27
--0.66
4.99
13.67
S9.32
56.88
78,47
1-~0.59
J60.99
195.13
233.18
274.88
319.'~8
367.37
419.61
475.15
534.40
597.52
664.77
735.36
808.51
A1080G0079
SUBSEA
T V D
FE'ET
2929.75
30'29.75
$129.75
3£'29~74
3329.74
3429.74
K529.73
3629.73
37'29.69
3829.53
3929.14
4028,47
4127.46
4~-5.90
4420.39
4 6.51
51
4611.61
4705.35
4797.56
4888.19
4977.38
5064.51
5149.20
523J.60
5311 . 19
"': ~ q-" 50
5460.03
5529.02
-.' ~"~. 79
R E C T A N
C 0 0 R P [
FEET
0.78 S
J.,46 S
2..07 S
~..59 S
'~ :!.7 ..g
3.96 S
4. S
8.1
o.6'7 S
8.11
13o16 S
20.82 S
S1.14 S
44.20 S
60~,56 S
81 o 06 c
104.54 8
130.96 S
161.06 '-'
19'5.1~ S
'"~3'~ 79 S
273.80 S
317.92 S
365.89 S
417.80 S
473.20 S
532.51 S
595.93 S
663.49 S
734,66 S
808.94 S
COMF'UTATION PAGE NO. ~
TIME -' DATE ·
14:50~09 14-NOV-80
G L; L A R C L 0 S U R E DOG[
N A T E S DISTANCE DI'RECIlON SFVFRI'
FEEl II M DG/J OOF
19.08 E 19.09 'S ~7 40 E 0.3l
19.62 E 19.67 S 85 44 C 0.08
20.25 E 20.35 S 84 10 F 0.05
~.0.63 E 20.5'0 S c:~
~,,. 1 E 0.29
20.93 [: "~1.17 n ~ ,~,
....... IS 0.25
21.2~0 E 21.66 S 79 "7 E 0.,,9
21.52 E 22,05 S /7 24 E 0. t0
'1.46 E ~"~.20 o /5 ~ K 0.-~
20.53 E 22.07 S 68 26 [- 2.01
17,95 E 22~26 S bS 45 E ~,50
18.->~ W 106.'11 "'
~- o . .,~ W 1.25
26.05 W 133.52 S Jl J5 W '2.43
S3.00 W ]64.-11 S 11 35 [4 2.09
40.~'4 W 199.22 S
48.93 W 237.88 S 11 52 W 2
59.16 W 280.ll S 12 12 W 2.50
68.94 W 325.31 S £2 14 W 1.84
79.14 W 374.35 S 12 J'2 W 3.88
90.64 W 427.,.,,_ S 1° 14 W 1.83
102.42 11.J 484.16 S 12 [3 110 3.00
114.49 W 544.68 S 1.2 0 W '2.57
126.81 W 609.27 S 12 1 W 3.5;0
139.95 11¢ 678.09 <~ I.l S=
· ~., W 3.00
153.14 W 750.45 S 11 46 114 2.84
165.57 114 825.71 S 11 34 W 2.37
AND GAS
-]I.L NO~ 4 GMS
~AY, NORTFI St OPE,
ALASKA
l~RIf-T DRli-T COIIRSE
Af~C.I_[' D]REC1]flN LENG]II
IJ M D FEE~
It: 15 S lv W 100.
-8 0 S 18 W 100.
7 45 S 1,.. ~ W 1
/ J5 S lA W ]00.
(.', 0 S ]9 W 100.
8 0 S 2] W 100.
8 0 S 17 W JO0.
9 0 S :19 W JO0.
0 0 S :19 W ~00.
9 15 S 18 W 100.
9 ,30 S :16 W 1000
0 0 S 11,' W 100.
o o 8 12 W :1.00.
0 45 S 11 W 100.
:' 0 S :1 9 W 100,
TRUE
VERT]'CAL
]~EF'4
FE[.T
5729.23
L-
..7~'4. J 8
58~9. ] o
,..:,c;c.. I 8
~,u",53 · J.~-.
6118.73
6184 · 34
6249,94
6315.22
6380.66
~4~ 08
65]3.34
4~.-'?.44
oo46.03
o712,62
677~.37
~846,44
6914,00
6981.40
7048.31
7115,22
F~
7] ~..1 9
72-16.43
7311,21
7376.32
7440.93
750.5,21
7631.41
JOB NO ~
VEPTICAL
,:.EL,] InN
FEE ¥
882 ~ 44
1031. ] 3
11F)':
1181 ~ 68
1 "~: ~' 9'3
J 331 +70
t 406 · 28
] 400 · ' ~:
0 ~
1555,42
1630.40
:1.704.89
:1779..,._.
] 854 · 41
1928~85
2003.29
215J,13
2224.18
2297.67
2371.86
2445,95
o ~ -) n S 2
.~_~' * ~
2596.35
2672.27
2747.70
2823.56
28?9.33
2974.73
A1080G0079
COHF'UTATION F'AGE NO. 3 '
TI~E DATE
14:50:09 14-NOV-OO
S U T:o" E A
i vo
FEET
(.~, ....,.I · + ~
5724. ] 8
~,o.,3,73
5918,18
~7C. ~,,
6048 · 7~
61] 4.34
6179.94
6310.66
6377.08
6443.34
6509.44
6642.62
6709.$7
o776.44
6844.00
6911.40
6978.31
704,. · oo
7111,49
7] 76,43
7241,2]
7306.32
7370.93
74~o,21
7498,98
7561
R E C ] A N G IJ L A R C L 0 S U R E DOGLEG
C 0 0 R D ]' N A T E S DISTANCE I~]l<r CllON SEVERIT~
FE[-'T F'E Ii1 D ft DG/I OOf~
884.56 S J. 76.87 W 902,07 S 11 J8 W 0,,~,~0
959,43 S 190.07 W 978.08 S I1 J2 W 3.08
1033.67 S 206.53 W ]054.]0 S lJ [O I.J 0.91
1108.04 "'
...... ~.70 W 1:130 39 S J 1 "5 W 0.00
11o~-:'-'"'.22 S 242.]9 W ]206.78 S I
1255,67 S 261.87 W :1282.69 S 1]
1328.40 S ,,.~-_°°°.04 W 13'~8.01,.. S ]1 59 W 0.75,.
1401.46 S 300.94 W 1433,40 S J2 7 W 2.26
]474.84 ,g 3:1° ''-' /,-'
,_.., W 1508.85 S ]o ]1 W O.~'=
]548.3.5 o"' S36.88 W 1584.,_. ~'7 S !..':> ~6 W 0.50
1621.02 S 357.72 W 1660.02 S 12 27 W 3.12
1691.90 S 38:1,44 W 1754.37 S :12 42 W ].06
]762.72 S 405.82 W 1808.83 5 12 58 I.) ].00
183,¥.67 '3 430.25 W 1883.47 S 13 I' Id 0.75
1903+99 S 455, 15 I,,J 195v,,:,4 ~, 17 /-' ;,I -,-'t,
"" . q J3 40 W 0.75
'1974.32 S 4o0.06 W 2031,,L;5 _
2044,"-' o - . --
9~ ~' 503 68 W o106,05 S J3 '.,0 W 0.79
°116.04 S 524..., W °180 ]3 S ]3 ~;6 W .24
°1R7.09 S o44.45 W °~53 83 S ]3 59 W 0 8~
2257. =;-' ·
..~ S 566.o6 W
2,7-~-~ 36 S 592 O0 W °401 49 S 14 16 W ] '19
,,_ ,,~,_ .* . . *,. . '
2397.61 S 616.27 W 2475,55 S 14 25 W 2,97
2468.84 S 639.41 W 2550.30 S 14 ~] W 1.80
~.40 73 S A64 ]7 W °626.]] S 1.4 39 W I O0
26]2.98 S 688.34 W 2702.12 S J4 45 W 1.07
2685,.,6 S 7]0.53 W ..777,96 S 14 49 W 1,54
2758.54 S 732,84 W 2854.22 S ]4 53 W 1.61
2832.50 S 752.66 W 2930,79 S 1.4 53 W 4.60
°907.98 S ~¢n 01 W 3007.68 S 14 48 W I 08
2983.37 S 788.22 W 3085,7-I S 14 48 W 6,37
"_'. A Y ~ NORI'H
GMS JOB NO:
SLOPE, ALASKA
I~PJ'FI
A N G L L'
TRUE
I~R]FT COURSE VERTICAL VERTICAL
r~IRL-CTION LENGT~I i;EP'~ I I SECTION
B FEET F"L:["I' FEET
54
57
0
0
0
1 5
15
S ] 8 L,I ] 00. 7691.58 313] ,56
S 15 W 100. 7748.94 '~°1"'."'"
,o04
S 13 W 100. ~' .]3 3295.].8
S It' {,,I i00, -'~'=-,4.>
o . / o.,~ = 3378,06
S 17 W I00. 791~'~51 3461 +48
,57
57
i- -
,J 7
,~,5
0
0
0
15
S ].7 W 100. 79c)4.80 3544.96
· ]'~ 6.,:
S l~A W 1.00. 8021.26 ' "'8 ,.3
S !8 14 100. 8075.72 371]
S 17 W ln0~. . 8130.73 3794.~,7
S 21 W ]00. 8187~01 3877.08
100 8244.19 3959.11
1 00. 8302.79 4040.1 0
100. 8o6=...,4 411v.7]
100. 8477.'''=. ._. -I191.03,
0
0
0
15
..,° 31 W 100. .... ,-,.'-'=o6. '-'3. 4339 .1"'~.
S ;.'42 W ]00. 8651.]8 4414.,,'~,
S 3] W 1000 ,~oo 5 8
,~ o,.., ...,. = 7 44 7, ,18
S S7 W 100. RYoo.,..O 4557.68
S 37 W 100. 884] .48 4624.08
~ 7 45
~7 45
,0 45
2 45
] 15
S ~0 W 100. 8o18.63 4685.44
S 40 W JO0. 8997.70 4744.07
S 39 W 100 90?5 13 4804 ~-
S 39 W 100. 9]-19.73 4868.91
S S2 W ~00. 9224.04 4934.27
0 30
0 0
7 0
8 0
S 37 W 100. 9299.65 4998.44
S 36 W 100. 9375.98 5061.34
5 37 W 100. 9453,14 5123,26
S 35 W 100. 953].40 5183.98
lO TD
A1080G0079
COMPUTATION f'AGF t,{O. 4'
TIME DATE
14~50:09 14-NOV-80
SUBSEA
FEET
7621 .=-Ooo
7678.94
7734. ]. 3
7788.42
-]0 ;~ .> .il
7896.80
7(/'51.26
8005.72
oOc, O. 7~,
8117.01.
8J 74.19
Ro-~o 79
°° $:'N ..,4
8363.2.5
0451. ~ 2
8496.23
o,~] ~ ~ ]8
'~a.>8.57
869'8.50
07, ~ · 48
8848.63
8927.70
9005.13
9079.73
9154.04
9229.65
9305.98
9383.14
9461.40
R E C T A N G ii L A R
C 0 0 R 0 t N A T E S
FEET
C I_ 0 S U R E DOGLEG
DISTANCE I~]I'<[.CTION SEVERiT,
FL E1 D M DG ," 100F'
3059.11 S '"'
o13.56 W 3z=._.44
3:{37.64._.c' 836.''''-~o~. W 3'>47.31
321. 8.54 S o....)'"'~',, o9, i,d 3330.6:3
3300.03 S 877.3] W 34J4.65
3380.87 8 900.49 W $490.74
3461.J8 S 925.04 W 3582.66
3541.59 S 948.86 W 3666.50
3621.79 S 973.38 W 3750.31
3701.43 S 998.49 W 3833.74
3779.57 S ~025.40 W 39J6020
3nc'-~ 36 S J056 79 W 3997 58
3928,79 S 1091.03 W 4077.47
3997 8'> S 11 .97 W 4].53.63
406'~.78~. S 1161.51 W 4225°
~1..~6 · Ac) ._el ] ] 97.65. bi 4 ._ .,., .,o. c,~,.
439J .3°,_, "'> 1°37. .30W 4370. I'~,
4256.21 S 12:77.03 W 4443.66
4319.]9 S 1315.63 W 4515.]2
4378,42 S 1355.58 W 4383o47
4433.00 S 1396.71 W 4647
4482.77 S 1436.~0 W 4707.25
4529.67 S 1.475.65 W 4763.97
4578 4R S l= ] 5
_ o ..09 W 48~.> 9]
4630.23 S [=~7.79
~., W 4885.°'
46U4~67 S ]596.62 W 4949°28
4738.b8 S J633.68 W 5012.29
4790.52 S 1672.11W 5073.96
4841.65 S 1709.94 W 5134.75
4892.01S 1746.53 W 5194.43
"2° J5
3.17
],94
J .70
I .68
0.2b
0,84
3.45
S 15 20 W
S 15 3J W
S I 5 45 tO
5 15 '-'_,/
S lc., JJ
2.47
.~.. ~_.
-~ + C.',.1
'~.° .57
S LA 27 W
S 16 42 W
S ]6 56 W
S 1.7 12 tO
..9 W
S 17 .>'
1 .46
1.26
2.85
S 17 46 W
S ]8 3 W
S J8 19 W
S ]8 36 W
S ! 8 49 W
3.99
0.00
3.07
2.00
4.92
S 19 J W
S 19 14 W
S L9 Z7 W
S 19 59 W
3.36
0.82
1.19
1.60
_ ANO GAS
.JE'LL NO~ 4 Gt'iS
BAY, NORT~I SLOPE, ALASKA
JOD NO; AlOSOGO079
COMPUTATION I-"A G E NO. ~.
TiME - DATE '.
J 4150109 14-NOV-80
TRUE
- I;RIFT DRIF-T COLIR~E L.~ERTICAL VERTICAl_ SUDSEA R E C T A N G U L A R C L 0 S LI R E DOGLEG
ANGI [7 DIRECTION LENGTH . DE-F'IH SECIlON lrVD C 0 0 R D I N A T I_' S DISTANCE DIRECTION SFVERIT,
D ~ D FEET FEET I'E['l' FEET FEET FEFT D ~ DG/1OOFt
,78 0 S 35 W
10~, 9610,99 5244,87 9540,99 494°,95.. S 1~8°, .,PO W 5254, ,.J2 S 19 50 W 0,,~0..
A~I~ 11955 MD ARK_ F'ROJ[[CTFD SURVEY STATION. S
>o 0 S 35 W
38 0 S 35 W
9, o610,08, 5"50,.°9..:_ ._ 0548.08 4947,49 5; 1/o,.,38, W 5259.77 S 19 51. u
4='o . g'65,7(. . ,., ,04 ~',277. "t:P_ , . o~--.o=, ,.,,.....,, 54 45'70,18 S J. 801 ~27 W 5")86,5°... ._ S 1o. 55 W
0 · O0
i. ['10SLJRE -- DIRECTIONI
DIS1ANCE I
S ~9 DF. GS 55 HINS W
~'~ 286.,
.,... F'F ET
i-1RCO OIL FIND GAS I,~ ~--]
''DS 17, .WELL NO: 4 GIXS ' i ,
'-- - FRUDHOE B~Y, N~RTH SLOPE, RLRSKFI ,
T------- ...............
EASTMAN NHIFSTOCK. INC.
SURFACE LOCATION: 2486 FT SOUTH!
450 FT ERST
S~CT~ON, ~
' T 1 ON', R 1SE,:UH_- _.'--~ ........._'-J .....
--~ .... ] -'--i-,
'
HOR I ZONTF]E-- P, ROJECTTON---
SCFILE 'l IN. ',= 500 FEET
_ DERTH__I ND I CRTOR:_ IVD.
1
1
t . - _
8918) )
I
~/~ DEPTH I1955 HD. 9553.54 TVD '
9518(~'.~ SOUTH 4970.18 NEST 1801.25
-i---CLOSURE 5288o5t-S 19 55-17--N
I --- I --~
~'%RCO O]'L AigD GAS ....................................................
IJC~ LT, WELL NO: 4 GMS JOB NO: AlOOOGO079
I"RLI[IIIOE BAY, NORTH SLOPE~ ~[.ASNA
,/,,c, 100-11000 HD, SURVEYOR: D F'EFFERI%ORN [I~TE RUN: 28--0CT-80
~0, I~r.G A/U NO: 1110, ]?~ IiEG ~/U NO: 7o9',~ , GYRO NO: ~0~, 271
CAf,II'_F<A NO: 1186, 10~5
RECuRi.~ OF' ]NT[]RF'OI_A]ED SURVEY'
I)S 17, WFL! NO: 4 GMS '-
F'RUI~IIO[ BAY~ NORIH SLOPE, AI_ASKA
.................. .JOB NO; A1080GO079 ................
TRUE SLiBSE'A
M _FF]SUI..'I' I~ VI .l(l I'CAL MII-TVD VFR ¥ICAI.
I'~£ f' T II DEF'I FI I; IFF DEF'TI-I
FLF- 'r FEE'T FEE 1' FE'E'T
i J ! '~.4. O0 90°5,57 al] O. 4 89.....J. _ 7
[ I O0''~. , O0 9596,02 .....~-~o z.,.,,.,, 0 9526,02
R E C 1' A N G I; L_ A
C 0 0 I',: I) I N A T E S
FEET
4547.24 S 1490.]4 W
4933,37 S J775o49 W
TIHE ...... DATE
14:48~27 14-NOV-80
C L 0 S U R E
DISTANCE DIR[CT]ON
F E- E T fi ~I
4785,18 S 18 9 W
5243.]3 S 19 48 W
VE-RT TCAI_
TI-I;] CIxNES
Check Form
for timely compliance w~th our regulations.
Operator, Wel 1 Name and Number
Reports and Materials to be received by: //-- /
Date
Completion Report
Well History
Samples
Mud Log
Required
Yes
Yes
Date Received
Core Chips
Core Description
Registered Survey Plat
Inclination Survey
Directional Survey
Drill Stem Test Reports
Production Test Reports
Logs Run
Digitized Log Data
Remarks
Yes
CURVE DATA
LOCATED IN
THE
APPENDIX
December 1, 1980
Mr. P. A. Van Dusen
District Drilling Engineer
Arco 0il and Gas Comapny
P.O. Box 360
Anchorage, Alaska 99510
Re ..
P.B.U. DS 2-1T .
ca 3
Kuparuk ~,
Kuparuk D-7
Kuparuk E-7
Kuparuk E-8 ,
We have checked our files and do not find Completion Reports
(form 10-407) on the subject wells, l{e understand the report
on P.B.U. DS 2-17 was waiting for a final directional survey to
be received. Available information indicates the other wells
have been drilled and were completed as unperforated oil wells
during October, 1980.
Please check your transmittals to confirm that the forms have
been sent. If they have not, send the appropriate 10-407 forms
at this time. Please let us know if it is necessary to delay
the final reports until receipt of directional surveys on any
of the welIs.
Sincerely,
,
John A. Levorsen
Petroleum Geologist
JAL: mm
ARCO Oil and Ga~ '~mpany
North Alas~ .Jmstrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Jerry A. Rochon
Dmstnct Operations Engineer
November 20, 1980
Reference: ARCO Directional Surveys
D.S. 17-b, 10/28/80 Multi-Shot
I
CONFER:
,'FILF:
~Pl~ase sign and return the attached copy as receipt of data.
Mary Kellis
North Engineering
Transmittal #830
DISTRIBUTION
NORTH GEOLOGY EXXON
R&D MOBIL
DRILLING GETTY
ENG. MANAGER PHILLIPS
D&M SOHIO
GEOLOGY MARATHON
STATE OF ALASKA CHEVRON
RECEIVED
NOV ?. 5 1980
Alaska 0Il 8, I)mm Cons. Commission
Anchorage
ARCO Otl and Gas Company is a Divms,on of AllanhcR,chheldComp,~ny
ARCO Oil and Gal~ Company
Norlh Ala~. D~stnct
Post Office Box 360
Anchorage, Alaska ej9510
Telephone 907 277 5637
Jerry A. Rochon
District Operahons Engineer
November 19, 1980
Reference: ARCO Magnetic Tapes
D.S. 3-6
1 ENG
I 2- E~NG
3 6NG
~ O~OL--
3 GEOL /
STAT TEC
--
STAT TEC
[CO~FER:
FILF:
11/3/80 Tape #File 1 NLLG (Pass t-3)File 2 (Pass 4-5) 9250-9950
D.S. 4-14 11/11/80 TapE#/ON/MS 8600-9290
D.S. 7-14 11/2/80 Tape# CNL/MSN 10000-10980
p.s. 14-5 lO/3O/8O
10/29/80
Tape# C/O 8680-9350
Tape# CN/~L$ 10200-11900
~Please sign and return the attached copy as receipt of data.
Mary F. Kellis
North Engineering
Transmittal #827
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
ENG. MANAGER
D&M
GEOLOGY
STATE OF ALASKA
EXXON
MOBIL
GE
TTY
SOHIO
~THON
CHEV~0N
ARCO Od and Gas Company ~s a O~ws~on of AtlanhcR,chf~eldCompany
ARCO Od and Gas Company
Norih Alas~ istrict
Post Ofhce ,.,ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Jerry A. Rochon
D~stnct Operations Engineer
October 31, 1980
Reference: ARCO Cased Hole Finals
D.S. 2-17 9/9/80 CNL Run 1
0/6/80 CBL Run 1
D.S. 2-17 9/9/80 Collar Log Run 1
D.S. 5-6 10/14/80 Spinner Run 2
D.S. 14-2 9/27/80 CNL Run 2
ti
2" & 5"
5"
- _
I 4
'~---I 1 GEOL
__1_.3 GEOt. '
__l _STAT TE~--
J STAT :I'EC--
j-
CONFER:
rll F:
D.S. 17-4 10/6/80 CNL Run 1 5"
e sign and return the attached copy as receipt of data
Mary F. Kellis
North Engineering
TRANSMITTAL #769
DISTRIBUTION
NORTH GEOLOGY EXXON
R&D MOBIL
DRILLING GETTY
ENG. MANAGER PHILLIPS
D&M SOHIO
GEOLOGY MARATHON
STATE OF ALAS~ CHEVRON
E
r ov 6 -1 a9
Alaska 0il & gas Cons. Commission
Anchorage
ARCO Od and Gas Company is a D~wslon of Allanl~cRichl~eldCompany
ARCO Oil and Gas Company
North Alas~ ~istr~ct
Post Office ',.,ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Jerry A. Rochon
Distrtct Operations Engineer
October 21, 1980
Reference: ARCO Magnetic Tapes
D.S. 17-4 Tape #61032 Run 2 9/30/80
~~Please sign and returnthe attached copy as receipt of data.
Mary Kellis
North Engineering
TRANAMITTAL #735
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
ENG. MANAGER
D&M
GEOLOGY
STATE OF ALASKA
EXXON
MOBIL
GETTY
PHILLIPS
SOHIO
MARATHON
CHEVRON
ARCO OH and Gas Company ~s a Oivls~on of AtlanhcRichf~eldCompany
ARCO Oil and Gas Company
North Alas( ]mtrlct
Post Ofhce"_ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Jerry A. Rochon
Distr~ct Operations Engineer
October 14, 1980
Reference: ARCO Open Hole Finals
lO/2/8o FI~C
p.s. 11-1~ ~_nl 5[
D.S. 11-14 10/2/80//~~~~un I & 2(same log) 2" & 5"
D.~~ 10/~80 Cyberlook R~ 1 5"
D.S. 17-4 9/30/80 FDC R~ 1
D.S. 17-4 9/30/80 FDC/CNL
D.S. 17-4
D.S 17-4
.S 17-4
9/30/80 DIL/L
9/30/80 BHCS
9/30/80 RFT
11
Runl
Run 1 & 2(same log) 2" & 5"
Run 1 & 2(same log) 2" & 5"
Run 1 5"
Please sign and return the attached copy as receipt of data.
Mary Kellis
North Engineering
TRANSMITTAL #696
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
ENG. MANAGER
D&M
GEOLOGY
STATE OF ALASKA
EXXON
SOHIO
~THON
ARCO OH and Gas Company ;s a O,v;s~on of Atl3nt~cR~chf~eldCompany
ARCO Oil and G( mpany
Alaska f3~t~cl
Po~t Othce Bo;..,~a
Anchorarje Alasi. a' .,.~,l~l
Telephone 90[ 2~; ,~J,
October 7, 1980
Mr. Hoyle Hamilton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject' Kuparuk D-6 (Permit No. 79-96)
Kuparuk E-7 (Permit No. 80-80)
(Permit No. 80-73)
(Permit No. 80-85)
Dear Sir'
Enclosed please find our Monthly Reports of Drilling
Operations for the subject wells.
Very truly yours,
P. A. VanDusen
District Drilling Engineer
PAV'sp
Enclosures
Form No P-4
REV 3-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-20498
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28334
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Atlantic Richfield Company Prudhoe Bay unit
3. ADDRESS OF OPERATOR
P.O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
2486' FNL, 450' FWL, Sec 22, TION, R15E, UM
9. WELL NO.
DS 17-4
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay .Field/ Prudhoe Oil
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec 28, TION, R15E, UM
12. PERMIT NO.
80-85
Po(
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Report of Operations for September, 1980.
As of 8/31/80, drlg 12¼" hole below 2630'.
Drill 12¼" directional hole to 10820'. Log w/DIL/SP/,BHCS/GR 10801'-7000'.
Condition tight hole and raise mud weight. Ran 9-5/8' csg and land w/shoe
@ 10680'. Cmtd csg w/500 sx Class G cmt. Set and tstd 9-5/8" packoff
w/5000 psi, ok. Drld out csg w/~" bit, wash and ream to 10690'. Attempt
perform leak off test and establish circulation in 9-5/8" x 13-3/8" annulus.
Set 9-5/8" cmt retainer and squeeze cmtd 9-5/8" shoe w/300 sx Class G cmt.
WOC, drilled up retainer and clean out 9-5/8" csg. Tstd formation to 12.5
ppg EMW. Drill and survey 8½" directional hole to 11955'.
As of 9/30/80, prepare to run OH logs.
14. SiGNED! heteby~th/· ~ ~' ~n'g-'s c~o~ec~t TiTLEDistrict Drilling Eng. DATE 0~'/'0~/~ ~ /q~O
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
#
ARCO Oil and Ga~ mpany
Alaska D~stnct
Post Ofhce Box 360
Anchorage Alaska 99510
Telephone 907 277 5637
September 25, 1980
Hoyl e Hamil ton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject- Drill Site 17-4
Dear Sir-
We appreciate the effort your group put forth in obtaining
the exception required for the original DS 17-4 plan.
Unfortunately, economic reasons require us to complete the
well in the standard manner.
Attached is a Sundry Notice outlining the completion plan
now proposed for DS 17-4. If there are any further
questions, please contact me at 263-4270.
Very truly yours,
P. A. VanDusen
District Drilling Engineer
PVD;SP
Attachments
ARCO 0;1 and Gas Comga~a¥ is: ?,~w~,c,q c,f AHanl~cR,cn;i~IdCoror~a~,v
Form 1'0~403
REV. 1-10-73
Submit "1 ntentlons" In Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS OI~,V~!~L.S.
(Do not use this form for proposals to drill or to
Use "APPLICATION FOR PERMIT---~' for such
O,L I--XI GAS'I'--!
WELLt I WELL I--J OTHER
2. NAME OF OPERATOR
Atlantic Richfield Company tl~.~
3. ADDRESS OF OPERATOR
P.O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
Atsu.ace 2486'S & 450'E of NW cr Sec 22. T10N. R15E. UPl
BHL' 1320'S & 1320'W of NE cr Sec 28. T10N. R15E. UM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
Pad Level - 30' RKB 70'
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20498
6. LEASE DESIGNATION AND SERIAL NO.
APL 28334
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
DS 17-4 (xx-28-10-15)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field/Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec 28, TION, R15E, UM
12. PERMIT NO.
80-85
)orr, or Other Data
NOTICE OF INTENTION TO;
TEST WATER SHUT-OFF L- PULL OR ALTER CASING
FRACTURE TREAT ~ MULTIPLE COMPLETE
SHOOT OR AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF:
FRACTURE TREATMENT ALTER lNG CAS lNG
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE~ Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Atlantic Richfield Company applied for and received an exception to Conservation Order No.
145 Rule 3(f), for DS 17-4, permit No. 80-85. For economic reasons, Atlantic Richfield
now proposes to comply with C.O. No. 145 and complete the well in the following manner.
The drilling and casing of the surface hole was the same as originally permitted.
A 12¼" hole was drilled to 10820' and a string of 9-5/8", 47# L-80 & S00-95 casing
was run to 10680'. It was cemented with 500sx of Class "G" cement.
An 8½" hole will be drilled to 11818' and open hole logs will be run up to the 9-5/8"
shoe. A 7" 29# L-80 liner will be set and cemented with + 175sx Class "G" cement.
A string of 5½", 17# L-80 tubing, packer, and necessary provisions for subsurface
safety equipment will be run.
The packer will be set above the Sadlerochit. A non-freezing liquid will be left
in all uncemented annuli within the permafrost interval. Selected intervals within the
Sadlerochit interval will be perforated and reported on subsequent report. 5000 psi WP
wireline lubricator, tested to working pressure, will be utilized with all wireline
work. Well will be flowed to prod~L~tion facilities during perforating and testing. The
downhole safety valve will be instaTled and tested upon conclusion of job.
Subsequent Work Reported
on Form No ------- Dated -..].-.ff...~
16. I hereby certifY that t~~correct
__
(This space for State )
~~ Copy
Returned
~ Imtructions On Reve~ Side //~///~
ARCO 011 and Gast -~mpany
I
-t I
September 24, 1980
Mr. Hoyle Hamilton
State of Alaska
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject- As-Built Survey Plats
Dear Sir' P~ B~ t7-8
In an effort to insure that your files are complete, we have attached
copies of our well location as-built survey plats for all wells
permitted thus far in 1980, excluding those included in our original
drilling permit applications.
Very truly yours,
P. A. VanDusen
District Drilling Engineer
PAV/JBK/jh
Attachments
16 1
T Io¢, gl~¢, d.M- '~
I I HEREBY CERTIFY THAT I AH
PROPERLY REClSTEREb ANB LICENSEB
TO PRAOTICE LAND SURVEYIN6
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS AN AS-
D.S. ~7 - 60~DUCTORS ~ THRU 6 BUILT SURVEY ~ADE BY HE, AND
THAT ALL B I~ENSIONS AND OTHER
AS-BUILT LOCATIONS DETAILS ARE CORRECT, AS OF:
STATE PLANE LAT S LON6
1. Y = 5927794.394 4. Y = 5928144.192
X = 708786.754 X = 708702. 546
LAT = 70°12'21.846'' LAT = 70°12'25.308'' ~~
LONG = 148°18'59.678'' LONG = 148°19'01.841'' ~.- ~ '..~
2. Y = 5927910. ~6 S. Y = 5928~6o.936 ~*~49~~
LAT = 70°'2'22.~5'' LAT = 70°]2'26.~6~''
LONG = 148o19'00. 94" LONG = 148°19'02.574''
3. Y = 5928027.297 6. Y = 5928376.895
X = 708730.871 X = 708645.462
LAT = 70o12'24.]5]" LAT = 70°12' 27.6~1~
LONG = 148°19'01.113" LONG = 148°19'03.331''
II L III I I~ IIlI [ ii illin i iii iii iii II II1~1 II I I I
oUcTo~ TH~U &
O.~.-17, coM ~ I ~-~Ui~T ~O~TIO ~
,,,, ,,,,,,-~ , ............. ~ ......
lanticRichfieldCompany DATE: DRAWING
NORTH AMERICAN PRODUCING DIVISION A.,..~
ALASKA DISTRICT- PRUDHOE BAY
II i ii I I III I I iii i i ill ...................... I1~11 '1
ARCO Oil and Ga~ ~ ompany
Alaska O=s[ ,
Post Ofhce Box ?,60
Anchorage. Alaska 99510
Telephone 907 2/'7 5637
September 9, 1980
Mr. Hoyl e Hamil ton
State of Alaska
Alaska Oil & Gas
Conservation Commission
3001 Porcupine Dr.
Anchorage, AK 99501
cl
--J 3 GEOL ' I
J STAT T~C
_~[STA_ T_T_EE t
j_FILF'~ ........
Subject: DS___l_l~4 ' (Permit no. 80-73)
~~7-4~ (Permit no. 80-85) ~
Kuparuk U-2 (Permit no. 79-111)
Kuparuk E-6 (Permit no. 80-78)
Dear Sir'
Enclosed please find our Monthly Reports of Drilling Operations
for the subject wells.
Very truly yours,
P. A. VanDusen
District Drilling Engineer
PAV/sp
Enclosures
ARCO OH and Gas Company ,~ m D v~SIO=~ of A ian'lcR,chtieldCo~';~pany
Fpnn No 10404
REV. 3-1-70
( ~ SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
I
OIL ~] GAS ~] OTHER
WELL WELL
2. NAME OF OPERATOR
Atlantic Richfield Co.
3 ADDRESS OF OPERATOR
P.O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
2486' FNL, 450' FWL, Sec. 22, TION, R15E, U.M.
5. AP! NUMERICAL CODE
50-029-20498
6. LEASE DESIGNATION AND SERIAL NO
ADL 28334
7 IF INDIAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO
DS17-4
-~. FIELD AND POOL, OR WILDCAT P-ff~7~6-B'ay
Field Prudhoe Oil Pool
11 SEC. T R M. (BOTTOM HOLE
OBJECTIVE)
Sec. 28, TION, R15E, U.M.
12. PERMIT NO.
80-85
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Report of Operations for August, 1980
Spudded well @ 1430 hours, 8/28/80_. Drld 17½" hole to 2620'. Ran 13 3/8" 72#
csg and la~-a-e~-a't 2-605'. Cmtd csg w/2225 sx. Fondu cmt followed by 400 sx.
Permafrost II cmt. Install 13 3/8" packoff and test w/2OOOpsi. NU 13 5/8~'
BOP stack and test same. Drld out, 13 3/8" csg w/12¼" bit and drill 12¼" hole
to 2630~. Run formation leak-off test to 12.5ppg EMW.
As of 8/31/80, drlg 12¼" hole below 2630'.
14 I hereby ~~c°rrect
SIGNED ~~g~~ii~~~~TiTLE. Distr~ct DrilliB ~__~q.~_,~, DATES~ii~'~' ~' ]] ]~ll}~}
mOT£-Report on this form is requ,rad for each calendar month, re§ardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeed,ng month,unless otherwise directed.
Ho~le H. Hmniltc~
To wi~ B.O.P.E. Teet
Well No. 17-4, A~00, Sec.
i8~10N-R15E ~4. Permit
No. 80-85.
O&G #4
4/80
¢
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Inspector ~.~.A ,~//~ //~/~
Operator ~ ~'/' ~
Well / 7 ' .~
Location: Sec 2 ~/ T/o~3R ]~-FUM
Drilling Contractor ~'~
Well / 7 -- ~
Representatzve /f~/2
Rig #
Permit # ~ d - ~5--
/~Caszng Set @ ~O~~ ft.
~ Repre sentat iv~-,7/Y~ R~d~ .z~Ff)/
Location, General
Well Sign
General Housekeeping
Reserve pit
Kig
BOPE Stack
Test Pressure
ACCUMULATOR SYSTEM
Full Charge Pressure... ~ ~ ~9 ~ ps~g
Pressure After Closure ./~ ~ psig
200 psig Above Precharge Attained:-
Full Charge Pressure Attazned: ~--
N2 A/~, 2 ~ 6D, ,~Z~), .~.20~,,~;~psig
Controls: Master ~/~
Remote ~/~ Blinds switch coverD/~
Kelly and Floor Safety Valves
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Z"O00
Upper Kelly
Lower Kelly
Ball Type
Inside BOP
¢
Choke Manifold
No. Valves
NO. flanges ~,~
Test' Pressure
Test Pressure ....
Test Pressure
Test Pressure
Test Pressure._~-'~ ~ ~
Adjustable Chokes
Hydrauically operated choke_ /
Test Results: Failures
Test Time ~ hrs.
Repair or Replacement of failed equipment to be made within
Inspector/Commission office notified.
------days and
__min. ~ sec
min -- sec
Distribution
orig. - AO&GCC
cc - Operator
cc - Supervisor
Inspector ' '
August 18, 1980
I~. P. A. VanDu~en
District Drilling Sngineer
ARCO Oil and (ho Company
P. O. Box 360
Anchorage, Alaska 99510
Prmlhoe Bay Unit D8 17-4
Atlantic R~ch£ield Company
Peru~t No. 80-85
SUE. Loc. s 248~*Sw 450'E o£ iqW or Sec
Bottomhole ~.i ~320'S, 2320'U o~ NB or Sec 28, TI0H,
Dear ar. VanDusenz
Bncloaed ~s the approved applioat~on for permit to dr~ll the
above re£erenced ~11. '
This approval ts conditioned on your application for exception
to Rule 3(£) o£ Conserv&tloa Order No. 145. I£ this exception
is not granted the completion o~ th~s wall will have to con,cnn
to the re~er'enced conservation order.
Well samples, core ch~ps and a mud log are not required. A
d~rec~onal survey ~s requAred. If available, a tape contain-
ing the d£gitized log in£ozlaat~on shall be submitted on all
loqs for oopyin9 except experi~ental logs, velocity surveys
and dipmeter surveys.
Many rivers in Alaska and their drainage systems have been
class£££ed as important £or the spawning or migrat~on o~
anadromous f~sh. Operations ~n these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title
Alaska Ad~tnistrative Code). Prior to commenc£ng operations
you nay be contacted by the Habitat Coord~nator*s off,ce,
Departnent o£ Fish and Game.
Mr. P. A. VanDusen
Prudhoe Bay Unit DS 17-4
-2-
August 18, 1980
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article ? and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
commencing operations you may be contacted by a representative
of the Department of Environmental Conservation.
Pursuant to AS $8.40, Local Hire Under State Leases, the Alaska
Department of Labor is being notified of the issuance of this
~x~it to drill.
To aid us in scheduling fieldwork, we would appreciate your
not/lying this office within 48 hour8 after the well is
spudded. #e would also like to be notified so that a repre-
sentative of the commission may be present to witness testing
o~bleieo~t p~oven~ equipment before surface casing shoe is
drilled.
In the event of suspension or abando~nt, please give this
office adequate advance notification so that we may have a
witne.ss present.
Ver~ truly yours,
Hamilton
Chairman of ~Y Oag:a O~ TH~ ~'~'"~ ~
Alaska Oil & Gas Conservation Commission
Enclosure
o.c: Oepa~nt of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o/anti.
Department of Laborr Supervisor, Labor Law Compliance
Division W/O encl.
ARCO Oil and Gas (~
oany
Alaska D~st n~N
Post Office Box 360
Anchorage. Alaska 99510
Telephone 907 277 5637
August 8, 1980
Hoyl e Hami 1 ton
State of Alaska
Alaska Oil & Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re' DS. 17-4 Permit to Drill, Rule 3(f) of Conservation Order #145.
Dear Mr. Hamilton'
Enclosed is a Permit to Drill outlining our plans for drilling
and completing DS. 17-4 with an 9pen-hole typ~ co...m.p]e, ti_o_n_.
This type of completion was selected to improve oil production
in DS. 17-4.
~_~An exception to Rule 3(f) of Conservation Order #145 requiring
drilled hydrocarbon zones to be cemented behind pipe is request-
ed so that we may evaluate this type of completion.
Included also are the $100.00 filing fees and the required survey
plats.
Very truly yours~
P. A. VanDusen
District Drilling Engineer
PAV/TK:ruo
ARCO
Form 10-401
REV. 9-1-78
STATE OF ALASKA
SUBMIT IN TRII~ fE
(Other lnstructl6q on
reverse rode)
ALASKA el L AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL OR DEEPEN
la TYPE OF WORK
DRILL ~-~
b TYPE OF WELL
OIL GAS
DEEPEN []]
SINGLE MULTIPLE
OTHER ZONE [] ZONE
Atlantic Richfield Company
3 ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4 LOCATION OF WELL At surface
2486' S, 450'E of NW cr Sec 22, TION, R15E, UM
At proposed prod zone
1320'S, 1320'W of NE cr Sec 28, TION, R15E, UM
API # 50-029-20498
6 LEASE DESIGNATION AND SERIAL NO
ADL 28334
7 IF INDIAN, ALLOTTEE OR TRIBE NAME
8 UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9 WELL NO
DS 17-4 (xx-28-10-15)...
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field-Prudhoe Oil
11 SEC, T, R, M, (BOTTOM .D 0 01
HOLE OBJECTIVE)
Sec. 28, TION, RISE, UM
13 DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12
5 Mil es NE of Deadhorse, Alaska
14 BOND INFORMATION
~EStatewide Surety and/or No Federal Amount 100,000
15. DISTANCE FROM PROPOSED * 17 NO ACRES ASSIGNED
LOCATION TO NEAREST TO THIS WELL
PROPERTY OR LEASE LINE, FT
(Also to nearest dng, um,, ff any) 1320 160
20 ROTARY OR CABLE TOOLS
18 DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT
4759'
21 ELEVATIONS (Show whether DF, RT, CR, ctc)
Pad Level - 30' RKB-70
Insurance Co # 8011-38-40
16 No OF ACRES IN LEASE
2560
19 PROPOSED DEPTH
ll,838'M.D.
Re ta ry
22 APPROX DATE WORK WILL START
9/4/80
23 PROPOSED CASING AND CEMENTING PROGRAM
,,
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quanmy of cement
32" 20" 941b. H-40 80' ZSO sx Permafrost II to surT.
"17-1/2',', 13-3/8" 72Lb. L-B0 Z/OO' Circ. to sUrf. (approx. 2500 sx}!
'1'2-1/4 9-5/8" 471b. S-95 10,930' +__500 sacks (Circ to +_. 500 above
,ndu
Sag
River)
See Attached Page
1980
IN ABOVE S~ACE DESCRIBE PROPOSED PROGRAM If proposal IS to deepen g~ve data on present productive zone and proposed
new produc~e zone. If propel Is to ~ or deepen ~ectlon~y, ~ve pertinent data on subs~face locations ~d measured ~d ~ue
~tl~ d~s. Give blowout preventer pro. am ,,
24 I hereby ~that ~e Fbr~lng ~s ~ and Correc~ _ ~ / , ~ __ ~
(Tl~s space for State office use)
CONDITIONS OF APPROVAL, IF ANY
SAMPLES AND CORE CHIPS REQUIRED I MUD LOG
[] YES ~ NO [ [] YES XNO
DIRECTIONAL SURVEY REQUIRED
RYES [] NO
OTHER REQUIREMENTS
A P I NUMERICAL CODE
~-o- ~ zq-
PERMIT NO. gO --,¢~'_ _ APPROVAL DATE
APPROVEDBY ~~~ TITLE
~i' ~:,~.~ 0 I"[ O~,P.~]SSION *See Instruction On Reverse Side
Au_crust 18~ 1980
Date
OR/18/R~ O
Permit to Drill Proposed Program
Atlantic Rij_'tJlY]eld Company proposes to.Airectionally drill this well to
11,818'M.D.,~ to produce the Sa(~rochit. 12-1/4" hole will be drill-
ed to 10,896'H.D., 8930's.s. (estimate~op of the Sadlerochit). An 8-1/2" hole
will be drilled to 11,818'M.D.,~~s.s. (estimated T.D.). Open hole logs
- - · + I
will be run from T.D. to shoe of surface casing at _2700 M.D., 2630 S.S. A
cement plug will be set to 10,758'M.D., 8830's.s. The 12-1/4" hole will dressed
to the top of the Sadlerochit, and 9-5/8" 47# L-80 & S00-95 casing will be set
at 10,896'__M._._D_._, 8930'ss. The casing will be cemented with +500 sacks cement to
+500' above the Sag Ri~v_elk. Below the 9-5/8" casing shoe, an 8-1/2" hole will be
~rilled t,o, +10,951~~s.s. The 8-1/2" hole will be opened to 14". The base
of the 14 ~ole will-be + 40 below the 9-5/8" casing shoe.¢ A 13-5/8" 5000 psi
RSRRA BOP stack will be u-sed. It will be pressure tested each week and operationally
tested each trip. A string of 5-1/2" 17# L-80 tubing, packer, and necessary pro-
visions for subsurface safety equipment will be run. The packer will be set above
the Sadlerochit. A nonfreezing liquid will be left in all uncemented annuli within
the permafrost interval. A 5000 psi WP wireline lubricator, tested to working pre-
ssure, will be utilized with all wireline work. The downhole safety valve will
be installed and tested upon conclusion of job. Based on data from other wells
drilled into the Sadlerochit, the maximum bottom hole pressure to be encountered
is 4669 psi. If a gas bubble at bottom hole temperature and pressure were to
rise without expanding but cooling to 80OF, it would exert 3820 psi on the BOP
equipment. The 13-5/8" 5000 psi RSRRA BOP stack will be tested to ~000 psi.
· ~ 16115
I ! HEREBY CERTI~~T
PROPERLY REGISTERED- AND LICENSED
TO PRACTICE LAND SURVEYING
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS AN AS-
D.S. ]7 - CONDUCTORS ] THRU 6 BUILT SURVEY HADE BY ~E, AND
THAT ALL DIHENSIONS AND OTHER
AS-BUILT LOCATIONS DETAILS ARE CORRECT, AS 0F'
DATE
STATE PLANE LAT & LONG
Y = 592779~.39~ ~. Y = 59281~.192
X = 708786.75~ X = 708702.5~6
LAT = 70°12'21.846' LAT = 70o12'25.308''
LONG = 148°18'59.678'' LONG = 148°19'01.841''
2. Y = 5927910.446 5. Y : 5928260.936
X = 708758. 898 X = 708674. 050
LAT = 70°12'22 995" LAT = 70°12'26 464"
LONG = 148o19'00.394" LONG = 148°19'02.574''
3. Y = 5928027.297 6 Y = 5928376. 895
X = 708730.871 X = 708645.462
LAT = 70°12'24.151'' LAT = 70o12' 27.611~
LONG = 148°19'01.113" LONG = 148o19' 03.331"
ii I I I I II
I II Ill II II II II
AIlanlicRichfieldCompan~ ~ DATE: DRAWING No:
NORTH AMERICAN PRODUCING DIVISION
ALASKA DISTRICT- PRUDHOE BAY
I I II I
ARCO OIL AND GAS t , , , ~
j U- :), ~,L I., NELL IqU;
PRUDHOE BAY, NORTH SLOPE,, ALASKA J
-,~-~ ....
_ _ u .........
~ , , ~ ,, , , ,
- -:--~nnn :" :' ' [ 1 - I - , / ,
::':::::~: ::: :::::::::::::::::::::
]~ :L~TT: ~:L~:_~_]L~VB~37~ O- ~=3700~ DEP=O ~ ........ ~ - /~ - :'. -'-::: ~
........ ~ ..... 0~ ........ ~ ..... ~ .....
..................
:-:. ::::::
,
_. _:~:': :-:: :--:::- ~o ~ ::' ~ooo ~ .... :moo ~ ,ooo- . ~mo - moo
-~-~ r-- ~ :~- -~-~ t- '~.Z:~- ~ ..... ~ .... ~ ......
4-, :~t *~. .:-~. r ~ ! :' ::~-i
13-5/8" buP STACK DIAGRAM
PREVENTOR
le
e
Accumulator Capacity Test
Check and fill accumulator reservoir to proper
level with hydraulic fluid.
Assure that accumulator pressure is 3000 psi
with 1500 psi downstream of the regulator.
BLIND RRHS
e
Observe time,then close all units simultaneously
and record the time and pressure remaining after
all units are closed with charging pump off.
e
Record on IADC report. (The acceptable lower
limit is 45 seconds closing time and 1100 psi
remaining pressure.)
PIPE RRHS
' 13-5/8" BOP STACK TEST
Fill BOP stack and manifold with non-freezing
fluid.
DRILLING
SPOOL
e
Check that all hold down screws are fully
retracted. Predetermine depth plug will seat &
mark running joint. Run test plug on drill pipe
and seat in wellhead. Run in lock down screws
i n head.
PIPE RRMS
e
Close annular preventer and chokes and bypass
valves on manifold.
Test all components to 250 psi and hold for 10
minutes.
Increase pressure to 3000 psi and hold for 10
minutes. Bleed pressure to 0 psi.
Close top set of pipe rams and open annular
preventer.
Increase pressure to 5000 psi and hold for 10
minutes. Bleed pressure to 0 psi.
Close bottom set of pipe rams and valves
directly upstream of chokes, then open top set
of pipe rams and chokes. Increase pressure to
5000 psi and hold for 10 minutes.
Test remaining untested manifold valves (if any)
with 5000 psi upstream of valve and zero pressure
downstream.
10. Back off running joint and pull out of hole.
Close blind rams and test to 5000 psi for 10 mir,.
11. Bleed pressure off all equipment open bottom
preventer. Make sure manifold & lines are full
of non-freezing fluid and all valves are set
in drilling position.
12. Test standpipe valves to 5000 psi.
13. Test Kelly cocks and inside BOP to 5000 psi
with Koomey pump.
14. Check operation of De Gasser.
15. Record test information on Blowout preventer
test form. Sign and send to Drilling Supervisor.
16. Perform complete BOPE test once a week and
functional operate BOPE daily.
-18-
' CHECK LIST FOR NEW WELL PERMITS Company
Item .Approve Date Yes No
(1) Fee ;4&oRr ~-/J-$=a.~;~, 1. Is the permit fee attached ..........................................
2. Is w~ll to be located in a defined pool .............................
Lease & Well No. ~-/e_)
Remarks
3. Is a registered survey plat attached ................................ /~j~ .
(2) Loc. ~_~3~'
4. Is well located proper distance frcm property line ..................
5. Is well located proper distance frcm other wells ....................
6. Is sufficient undedicated acreage available in this pool ............
7. Is well to be deviated ..............................................
8. Is operator the only affected party ................................. /~oC .
9. Can permit be approved before ten-day wait .......................... /~0~' __
(3) kSmin.
( 4 ) Ca. sg.
(5)BOPE ~.~.~
12. Is administrative approval needed ...................................
.,,
13. Is conductor string provided ........................................ ~
14. Is enough cement used to circulate on conductor and surface ......... ~
· 15. Will cement tie in surface and ineermediate or production strings ...
~16. Will cement cover all known productive horizons .....................
17. Will surface casing protoct fresh 7rater zones ....................... ~
18. Will all casing give adequate safety in collapse, tension and burst.. ~
·
19e Does BOPE have sufficient pressure rating - Test to O'-oo~ psig · e ~
Approval Reccmmended:
Additional Requirements:
10. Does operator have a bond in force
11. Is a conservation order needed ....................................
Geology: Engineering:
HWK ~ LCS BEW
JAL
rev: 03/05/80
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
LIBRARY TAPE
CURVE SPECIFICATIONS
Company
Arco Oil & Gas Co.
Well DS 17-4
Field Prudhoe Bay
County,State
North Slope, Alaska
Date 10-29-80
Curve Name
(Abbreviated) Standard Curve Name Logs Used Scale
GR G,amma Ray _ ,. 'CN/MS ~ , 0-100
SSN Short Space Neutron , CN/MS 0-2000
LSN Long Space Neutron .,. CNZMS 0-2000
NEU N. eutron ..... CN/MS 60-0
.,
...
PAGE 1 ARCO OIL & GAS-- .... 9.S. 17-4
DRF~DHOF.BAY ..... NORTq SLO~E,ALa$<A WLAC 6490
DATA EVERY 1 SadDLES
_ _
.... t.O Lo&,_O__O_ ..... 9_..~_,~__9 ...... ~0_~54 __. 7_U~7_ ........ ~.&~9_7: ............................................................
___tO LQO~._5._O_ __ !_02,78 .... _8_77_. ~e .... 7~_9_.,.0_~ ..... ~.6,_r~_~ ......................................................................................
..... _~_0!_0_! ,_ 0.0.. ~ 0 t_~6 _9 _ _~._9_Ltt_ ........ 7E~5__9_ .... ~6_~ 8 ? ................................................
..... ~ _0!_.O_L 5_0 ! 0 ~, _98.. ¢_9_.~.~5_5 ....... 7.1._~_,__25 .... :t6~..6! .....................................................................................
1 ~_t._O 2 ,_ _o_Q
..... _1_._o!_0_~_.~._~_0 ....... ~...0_$.,_~_5 .... .6.9..7.~2__2_ ...... 7_0__9....~03 :S&,_l~ ..........................................
.... ¢__t_o_~.,_~__Q ..... i_o_~.,_~_ ....... ~. ~ ~ ..... ~_o!~s.? .... ~..~ ..............................................................................................................
.......... ~...._o__~__Q~_.,.~..~ ....... ...t.._~.~...,_~! ....... ..~.~.,..~ ..... ?~_o__,.~_s .......... ~...~_~.~ .........
........ :...O_~_O__~.__Q.O ...... :~_!.,_'.+_.~ .......... ~!7...J.__*_ ........ ~!_0.,_2_5_ ........... ~Z~Z_5 ...................... _:.i_i.:. :_..: :..:_ 2:1:i~i_'__.:..i_::::::::::::::::::::::::::::::::::::::::::::::::::::
J 0_1.0_.~.,..?0. lO7
....... tO_to_?...,_._O.._O .......... t0_6_,__2_o ........ 7_Q_O...,_8_~ ........... 7..o_% 15 ....... !5,__.~_4 ...........................
....... .~_.o.~.o_.~..,...~..o ............... ~..~!,..~..~ ........ 6~.,.~.~ ..... :..._u,,.?~ .............. ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
10107.00 ~00o10 688~67
......... ~_.~.!O_7_,_~..0_ ....................
j OtlO,O0 102.42 674,02 713~9~ 33.87
lOllt,O0 9~.2~ 66~,26 710.25 ~5,00
~0112.00 90.
10113,00
1011~.00 97.1!
10115.00 97
1011~.00 94
10117,00 89.~5 6q. 2.29 687.06 35,30
~Olla,OO 86.55
101!o.00 94.~6 638.62 677.P_9 39.2§
~,,0120. O0 9P.65 ~2,52 655.~2 ~9.21
10121.00 87.65 6 ~,~ 08 652.88 38.92
..... ]O12X.O0 8~L~O ~4~%9 679.74 3§°63
~ 012~.00 8~.1l S78 91 705
... '~ 012~.00 87. t41 702t10 715~1~ 33,50
..............................................................................................................................................................................
.............................................................................................................................................................................................................
!
mAGE
mRI'IDHOf · B
3AT/~
~RCO OIL & GAS ...... g.S. 17-~
AY ..... KIORTq SLO~E,AL~S4A HL~C
Y I
1012_7_,_5
...... 1__0__1..28,0._0_
G R_ ........ SS_~ ............ LS.N_ .......... ~lEiJ
8_7_,_~.1 .... 7_0_.0_.~ ..... Z22 _- 4. 6, ........ ._33_.21
8&,?_? ~695,~55 __751_._01__ .... 33 ~ 8
_ $_Z_L0.) . 6..9__~,_1._! ..... 72._9_..._7___~ ....... 3 {4 . 5E
_8__~ ,P.. 3_ 68_~_,8 ~ _..7.~,_6_,__1_2. ...... 55,6.6
1015'~,50 7'~,98 705,76' 7t1.~7
1 013~.50 GG.~I 691~ 1 691~ 38.70
I 01~,50 67,51 667,92 678.52 35,~1
1 0136.50 90.,"52 639.8~ 68~.62 36.~7
10137.50 80
lO13a.5o 78.
10139,50 85.
101~0.50 88,
10141.50 89.
I 01U~9.50 89..36 696.00 705. :57 37.68
101~.50 91.n7 70~.5~ 706.59 36.65
101~.50 90.32 725.29 7~.90
I 0 lq.r-, . 50 89.24. 726.51 751.76, 32.18
10147.50 97.53 711,87 751,76 32.26
101~.~.50 95,83 693.55 7~1.99 31,89
.............. ........................... ::::::::::::::::::::::: .............. :~::~:~::; ~..::5:::::::::~:::::::~::~ ~JS:~ :~.. J~._ ~ ::..;:.~.~..~
................... ~, ..................................................................................................... ~,, .................................................. ::~=...: ................. ~.......:__:~ .................... :.~::._..~.~,.:.~:~.z..~t _ ;~::~s ~.~.~;~ ................ ~J~,,~ .J~:~L~..~:~
......... .t.O.!..~_.O._,..~.q ............ !.~.5.~76 ............. 6A~_,_.~.! ........ 7_~.!,,.~.% ........... ~.~..S_~_
=A'GE ~ ARCO OIL ~ GAS ......
=,R,IDH3~',BAY ..... ~IO~TH SLOPE,ALaSKA
DATA ~I~RY 1
17-~
HLAC 6~BO
101~1,00 91,31 ~52~...0.5 72~12
101~2 O0 ) 70 6~.7 1_.7 70~+ 15 35
1~ 016'~ O0
ln16~.oo 90
10165,00 97.1
0 0 9
1 0169,00 95,95 6~0~0~ 710~5
10170.00 9~.97 62 ~.j 5 ~ 701~71 31.~5 ..........................
~_~7~, 00 ~9,73 6~3~1 66~5B 3~20
I O17A,O0 9~.~g 650,..83 ~67,53
:~Ar~E ~. ARCO OIL & GAS ......
:>FtltgH'F~F 'BAY ..... NORTH SLO:>E,
3&TA E"vFRY 1. SA,~LES
17-~
~LAC GNBO
1 0 l. Rq.. 50 99.98 58,7.35 G~9.22 36.32:
I nls~.~O 98, ~.5 5~7.3~ 6~8.00 3G,~3
1 018~,50 96.19 587.35 6~.3~ 37.G~
10188.50 9P.1
10189.50 8G
10190.50 76.0
101.9:1.50
10192.50
1Olgz.~¢ 82.52 A03o~2 68~.6~ 32.33
10194.50 83.38 GO~.~ 697.06 35,t5
91.07 6,02.00 6,60.21
T~'~''' ~"' ~'~ ~;~' ..~.~'~ ~?~ ~~'~
8~.11 5R3,G9 661 ~3
........................................................ ]}?:y~'~;;?
1111
1111
11
11
11
11
It
11
11
11
111111
111111
00 00
O0 O0
O 0 0000
06 0000
O0 ~)0 O0
OfiO0
00 00 00
O0 O0
O0 O0
0(90000
000000
77
77
77
77
77
77
71
77
ll
71
77
77
Do0000
000000
O0 O0
O0 O0
o0 o000
O0 0000
O0 OD OO
O0 O0 O0
OOu0
0000 O0
O0 O0
O0 O0
OOO000
000000
7777
77
77
7i
17
77
77
77
77
77
77
77
77
1111
1111
~ 1!
bt6bbbbb 11
(bbbbOb6 1~
hb b6 11
bb Ob 11
ho bb 11
66 Ob 11
o6b~bb 111111
~obbb66 111111
·
0000OO
000000
O0 O0
00 OD
O0
O0 0000
O0 O0 OD
O0 O0 O0
0000 OD
0000 O0
O0 O0
O0 O0
OOOOO0
000000
333~3]
33
33
33 ~
222222
222222
22 22
22 22
22
22
22
22
22
22
22
22
2222222222
2222222222
cccc ~ k-®%
C k ~ Y
C k ~
C ~
C ~, ~ ~
C K ~
CCC¢ ~ ~
Y ¥
*S3A?T* USER I-'CAL
MUN[[IJ~ f:,WS KLIOk4(;
*SI AH'I* USEI~ PCAL
Fi.- PP
P
P
i-'FPP
P
F
[tO707,b1032]
Ski'-UO. *~TARI*
I]0707,01032J
['ART*
P RP, I~ b O DDI)D
D D U Ij D
~ R U b D
kRRi~ b U O
P ~. U U D
~ D U lj P
k ~ UUUbU DDDD
O tJb
job
SHIP
H H UO0 EEEEE
D H H O O E
D H H O O E
D nHHHH O O EEEE
O H H U O L
O H H b 0 E
H H 000 EEEEL
4127 DATE IO-UCT-80 08:14:3b
4127 DATE 10-UCT-80 08:14:3b
1111
I1[1
I1
ti
II
11
1I
I1
llI[
IlIl
FPPPPPPP
PPPPPPPP
PP
PP
PP
PPPPPFPP
PPPPPPPP
P~
PP
PP
PP
PP
PP
PP
PP
PP
PP
TTT'I 1. r ['q I l
'ITTI 'r I 1'l 'I i
'r I (;U UU
[' T [j 0 O 0
T [ fib OtJ
T P O0 (~t~
F ~ O0
rl' OC (JCl
Y f tJ [ t.j U
I I (JO
r T bOOUt~tJ
T/ gbOtjll(I
4127
IO-(ICT-80
DATE IO-UCT-80 08:14:3~
07:t2:03
15:10
C~¥
PCCC
PCCC
THA~tV 5 ....
VV VV k~ ~ kk
VV VV EE HR Rk
VV VV GE ~h RH
VV VV EEEE~,kkh ~RPH~
VV VV LEEEEEEE ~PR~H~H
VV VV EE H~ PP
VV VV ER ~h ~R
VV VV ~,F ~ ~F
VV VV gE PP HP
VV EE~E~kLEb~ ~H RR
VV EEE~EEEEEE ~P ~R
II1111
111111
I1
11
11
II
11
11
11
1I
1I
111111
111Ill
YY
YY
YY
YY
YY
YY
xY
YX
O000Oo 0o0000 44 44
000000 oO000O 44 44
Ou O0 O0 O0 44 44
O0 ou O0 Ou 44 44
O0 o0~0 O0 0o0o 44 44
O0 oOOO O0 o000 44 44
O0 Or) O0 ~)0 O0 O0 44444~4444
O0 O0 O0 O0 O0 O0 4444444444
0000 00 nO00 O0 44
0000 Ou 0000 O0 44
O0 gu On O0 4~
O0 uO O0 Ob 44
000000 OOOOOO 44
OOOOO0 000000 44
4127 l)Alk 10-0CT-80 08:14:3b
IO-OCT-WO OR:Oo:2g
V
SCHLUMBERGER COMPUTING CLNTL~
10707,61032
TAPE
DATE: 80/10/ 4
i APE,
TAPE t'~ ANL: 61032 1.) A ~l'L: 80/10/
~LEv1. CF NAN,': LDI'[
TAPE C[]N~[1NUATlfJN N[JM~LH: O1
CASll':(, IJNII, LER 9ot~25010080/RI'I SIZE 8.5/I-~UID TYPE IaZGNO,.SULFONATL/
L~LNb lO.?/Vl~C 41oO/PH ll.5/~I. UID LUS~ 4.2 Mh/RM
~M~ 1.02@60 ~/RHC 1.58~e0 I~/NAX RLC ~MP 193
IL'AI~EN I~PlJ[~ RIJN#2 D1L IL, i.~GGt':D JOSLP~O
TH[. ,SPLU CUHVE IS ACrUALL¥ A LL-,8 ABOVE 10795o
F l. bE` ~t[~ ADEP
i,1-. N(;'I Id: 62 bXTEb
[bE I'}ANL: LDII .001
b'~AXlt,~U~ PHYSICAL RLCtJRD LfiNGTtd:
PREVIL'llE ~'ILt: NAME:
1024
w~.l,I, ,'-,ILL IN?LiHMA"IIO~'~ I~LCEED
I,E`NGI ti: 168
w ~'.I,L:
RANGE:
l'()w ~,1:
5F C I It~:
ARCO
LRI LL~S I I'L 17-4
P [,'llD H(] E BA~
15L
1ON
5~. SLOP E
~LAS~A
0
SIZE
1
CODE
0
,)AIIJlv, ~PFC1F I. CAIlOa bL,(,CKS:
¥ JC 11J£JIL~ SV~PD~
ILL) jilL
&~LU
(, F C N L
CALl CNL
Db HO F DC
NPBI CNb
N ~, A'l CNL
NCt~L CNL
F('NL CNb
D~[
t~NiIS AFl APt AP1 APt Flhg# 81Zt gxP
Fl 0 0 0 0 0 4 0
~ V ? i O, 0 0 ~ 0
UHNN 1 12 46 0 0 q 0
UM~ 7 12 44 O 0 q 0
OHM~ 7 22 1 0 0 q 0
GAPI 42 31 32 0 U 4 0
ia 42 28 1 0 0 ~ 0
G/( J 42 44 0 0 0 4 0
G/C J 42 35 I 0 0 4 0
C/C q2 42 1 0 0 4 0
CPb 42 ~4 92 0 0 4 0
CPS 42 34 9] 0 0 4 0
GAPI eO 31 32 0 0 4 0
IJS/F ~0 52 32 0 0 4 0
PROC SA~ RI~P DEPT
0 1 08 0
0 1 b8 0
0 1 b8 0
0 1 68 0
0 I 08 0
0 1 68 0
0 1 b8 0
0 1 6~ 0
0 1 58 0
0 I b8 0
0 I 68 0
0 I 68 0
0 1 68 0
0 1 68 0
0 1 b8 0
119t~5.000
119O0.000
I ! 70C. 000
1 160U.¢)00
11500. 000
t I lO0. 000
ll~uO.O00
l~2u0.u00
11100.000
11090.000
8P
C ~
aP
SP
G P,
G P,
GI~
SP
G},
SP
GF
IeHOB
bP
G~
GP,
GF
VALIIE
-46.q38
40.438
2.b49
92.188
-50.313
40.438
2.549
99.438
-8] .6e~
Z].891
2.4~4
22.484
27.70~
2.271
2~.875
-78.875
]1.~2~
2.256
25.328
-71.56J
21.734
2.30~
21.~1~
-59.219
27.797
2.252
23.578
-57.063
34.0]1
2.3%2
27.219
-24.984
78.625
2.555
85.125
-29.188
75.4j8
2.570
-10.3o5
91.063
2.0R2
78.438
NbEMONIC
ILD
CALl
NRAI
DT
ILD
CALl
NNAT
DT
iLt)
CALl
N~A~
DT
ILD
CALl
NRA/
DT
lED
CALl
DT
ILD
CALl
NMAT
DT
CALl
NRAI
DI
CALl
NRAT
OT
JLD
CALl
OT
ILD
CALI
NRA'I
DT
ILD
CALl
NRAT
DT
VALUE
5.504
7.355
2.391
79.188
4.828
1.]55
2.~91
78.56~
2.795
8.539
2.297
69.188
1.271
8.)75
2.563
9~.J75
1.673
8.406
2.533
89.750
2.061
8.430
2.352
88.750
1.947
7.781
2.{91
89.750
2.658
9.008
2.660
q2.750
7.973
7.598
2.305
8].188
98.938
10.164
1.~26
57.594
1.827
15.695
4.082
99.503
MNbMONIC
DRHU
NCNL
NCNb
ILM
DMHU
ibm
DRHU
NCNb
1LM
DI~H[J
i~C NL
IbM
NCNL
IL~
NCNL
iLM
NCNL
DRHO
NCNL
DRHU
NCNL
iLM
DBHO
NCNb
VAhUE
4.914
0.280
3566.000
4.734
0.280
3566.000
2.977
-0.0i7
3510.000
1.395
-0.016
3180.000
1.724
-0.010
3]18.000
2.217
-0.003
3526.000
2.070
0.0]8
3258.000
2.781
O.Olo
3074.000
8.570
0.098
3148.000
79.500
0.016
4868.000
1.80i
0.012
1531.000
MNEMONIC
8FI,U
NPH1
FC NL
SFLU
mPHl
FCNL
SFbU
NPHI
I~CNL
SFbU
NPHI
FCNL
8FLU
NPHI
FCNL
SFbU
NPHI
FCNb
SFLU
NPHI
FCNL
SFLU
NPttl
FCNL
SFLU
NPHI
~ CNL
SFLU
NPHI
FCNL
SFLU
NPHI
FCNL
VALUE
5.242
26.025
1528.000
5.005
26.025
1528.000
7.855
23.291
1588.000
2.31~
27.490
1272.000
2.168
27.002
1335.000
2.893
24.208
1539.000
2.781
25.635
1395.000
3.986
28.174
1211.000
10.188
24.512
1477.000
420.250
6.738
4092.000
2.207
48.340
400.750
I) ~ P
10900
tORO0.000
1 .q7 t)o. 000
t0600.O00
10%t)U.
10~,0o.000
10 ~}()0. o00
10200.000
10000.000
qq(}o. ()00
Si-
P, hUb
GP
bi.-'
DItiJB
Gl-,'
8~
GR
GP
p
SP
G t~
SP
GP
G~
SP
GR
GP
VALUL
-10.2o3
102.750
2.457
89.56~
-11.3t~
2.4~1
9J.56~
-166.000
09.063
2.482
109.06]
-160.500
-999.2~O
-999.250
171.875
-15t.750
-999.250
-999.25O
183.500
-162.875
-999.250
-999.250
16~.250
-192.000
-999.250
-999.250
115.1~8
-175.250
-g99.250
-999.250
158.000
-191.125
-999.250
-999.250
197.125
-188.750
-999.250
-999.250
133.~75
-999.250
-999.250
175.75o
Nhk MUM lC
ILD
CALl
NRA%
CALl
NRAI
DT
1 L D
CALl
DT
ILO
CALl
NRAT
bT
CALl
NRAT
DT
1LD
CALl
DT
iLO
CALl
NRAI
OT
ILD
CALl
NRA'[
DT
ILD
CALl
DI
ILO
CALl
NRAT
DT
ILD
CALk
NAAT
DT
VAbtlr~
2.~75
15.031
~.~54
114.563
2.174
11.484
3.492
95.188
2.56]
15.56]
4.i45
97.~75
3.232
-999.250
-999.250
100.1~8
5.527
-999,250
-999,250
81.750
],075
-999.250
-999.250
98.750
5.756
-999.250
-999.250
79.O00
2.845
-999.250
-999.250
99.t75
~.920
-999.250
-999.250
90.563
4.230
-999.250
-999.250
7h.OO0
2.582
-999.250
-9q9.250
92,750
MNEMON1C
ibm
Dkh0
NCNL
ILM
~CNL
DAHO
URHO
NCNL
ILM
DRHO
NCNL
v~C N b
ILM
Df~HO
NCNL
NCNL
ILM
NCNL
ILM
N C N b
ILM
DRHO
NCNL
VALUE
2.281
O.077
1787.ooo
2.164
-0.000
1930.000
2.665
0.0t2
1560.000
].016
-999.250
-999,250
5.4]0
-999.250
-999.250
3.146
-999.250
-999.250
5.344
-999.250
-999.250
2.922
-999.250
-999.250
3.820
-999.250
-q99.250
3.88]
-999.250
-999.250
2.615
-999.250
-999.250
8fbO
NPH1
~ CNL
SFhO
NPHi
SFLU
NPHI
FCNL
NPHI
FCNL
NPHI
~CNL
8FbU
NPHI
FCNL
SFL0
NPHI
FCNL
SFLU
NPHI
NPHI
FCND
SFL, U
NPHI
FCNL
SFLU
NPHI
FCNL
VALUk
2,561
510.750
2.236
39,111
525.500
2.914
45.875
402.250
3.979
-99925.000
-999.250
b.816
-999.250
-999.250
4.445
-999.250
-999.250
8.078
-999.250
-999.250
].719
-999.250
-999.250
4.395
-999.250
-999.250
6.b05
-999.250
-999.250
3.326
-999.250
-999.250
q7uu. O00
9o0(). ~)00
95(,)0. 000
94(:0.000
9 ]00. 000
000
9100.OO0
'4()00. 000
8900.O00
8800.000
GP,
HH(}B
GR
GR
H H tJ b
Gh
SP
GH
f,, FItJ B
bP
GR
GR
SP
G~
bP
G~
GR
SP
GH
GF
-190.125
-999,250
-999.250
192.250
-194.000
-999.250
-999.250
172.375
-194.25(J
-999.250
-999,250
96.938
-196.875
-999.250
-999.250
95.563
-190.500
-999.250
-999.250
90.188
-192.750
-999.250
-999.25o
95.1q8
-1~e.125
-999.25o
-999.25,)
98.375
-18b.250
-999.25()
-999.250
lOl.ObJ
-189.OO0
-999.250
-999.25O
74.813
-189.125
-999.250
=999.250
86.000
-191.000
-999.250
-999.250
92.b25
CALL
DT
CAbI
NRA~
bT
ILO
CALl
NRAI
DT
ILD
CALl
NRAT
DT
IbD
CALl
NRAT
DT
ILO
CALl
NRA1
OT
ILD
CALl
NRAT
DT
CALl
NRAT
DT
iLD
CALl
NRAT
DT
1LD
CALl
NRAT
DT
1LD
CALl
NRAT
DT
VALI}K
2.281
-999.250
-999.250
91,750
2,O06
-999.250
-999.250
102.188
2.256
-999.250
-999.250
86.503
2.885
-999.250
-999.250
83.750
2.582
-999.250
-9qq.250
86.000
2.844
-999.250
-999.250
84.375
2.794
-999.250
-999,250
84.750
2.320
-999.250
-999.250
88.750
2.063
-999.250
-999.250
85.000
2.018
-999.250
-999.250
93.503
2.096
-999.250
-ggg,250
90,{75
DRHO
NCNb
DRHU
NCNB
1LM
DRHO
NCNb
DRHO
NCNL
i LN
DRHU
N C N L
DRHO
NCNb
DRHU
NCNL
DRHU
NCNL
u~HO
NCNb
DRHU
NCNb
DRHU
NCNL
VALUE
2.139
-999.~50
-999.250
2.090
-999.250
-999.250
2.223
-999.250
-999.250
2,904
-999.250
-999.250
2.621
-999.250
-999.250
2.863
-999.250
-999.250
2.740
-999.250
-999.250
2.230
-999.250
-999.250
2.066
-999.250
-999.250
2.020
-999.250
-999.250
2.107
-999.250
-999.250
MNkMONIC
NPHI
BCNb
NPHI
FCNL
8P bO
NPH1
~CNL
SFLU
NPHI
FCNb
SFbU
NPHI
FCNL
8FLU
NPHI
FCNL
NPHI
FCNL
SFBU
NPHI
FCNb
SFLU
NPHi
FCNL
SFLU
NPHi
FCNL
SFLU
NPH1
FCNL
VALUE
2.855
-999 .~50
-999.250
2.541
-999.250
-999.250
2.O31
-999.250
-999.250
3.014
-999.250
-999.250
2.842
-999.250
-999.250
2,914
-999.250
-999.250
2.992
-999.250
-999,250
2.742
-999.250
-999.250
2.402
-999.250
-999.250
2,154
-999.250
-999.250
2.342
-999.250
-999.250
D L ~ '! H
P,
B%¢~0.00U
8 ~00. 000
~ :JOt}. 000
A 100. o00
800U.
7900. 000
7800. 000
7 700. 000
lw f,~ k, M I j 1,~ ].C
GR
bP
GI~
GR
SP
GR
GR
SP
G~
bP
GP
GR
SP
.RHtIB
Gl,',
S P
GF
GI~
J,,H {J IJ
-18B.875
-99§.250
-~99.25o
92.813
-181.125
-999.250
-999.250
97.938
- 18 z. 000
-999.250
-999. 250
-177.875
-999.250
-999.250
129.500
-183.000
-999.250
-999.250
131.875
-180.375
-999.250
-999.250
105.125
-18~.125
-999.25o
-999.250
92.938
-181.375
-999.250
-999.250
-1~1.250
-q99.250
-999.250
117.188
-195.000
-999.250
-999,250
8J.125
-195.250
-999.Z50
-999.250
t,) N
I~MON lC
CALl
UT
ILD
CALl
NRAT
IbD
CALl
NRAi
ILD
CALl
NRAT
ILD
CALl
N~AT
DT
ILD
CALl
NRAI
D~
iLL
CALl
NRA%
DT
ILD
CALl
NRAT
UT
ILD
CALl
NRAT
DT
ILD
CALl
NRAT
PT
[ LD
CALl
NRAI
DT
VALUE
2.{07
-999.250
-999.250
91.t88
2.484
-999,250
-999.250
9O.O00
2.598
-999.250
-999.250
91.375
2.4bl
-999.250
-999.250
77.~75
3.123
-999.250
-999.250
92.750
3.398
-999.250
-999.250
gE.Lb]
-999.250
-999.250
93,750
3.596
-999.250
-999.250
90.000
4.113
-999.250
-999.250
88.t75
3.957
-999.250
-999.250
8~.375
-999.250
-999.250
92.50]
MNkMONiC
ILM
DRHU
NC NL
.ILM
UHHO
NCNL
iLM
NCNL
NCNL
iLM
NCNL
iLM
NCNL
ibm
DRHu
NCNb
ILM
DRHO
NC N b
ILM
URHU
NCNL
DRHO
NCNL
DRHO
NCNb
VAbUE
2.318
-999.250
-999.250
2.512
-999.250
-999.250
2.586
-999.250
-999.250
2,420
-999.250
-9~9.250
2.990
-999.250
-999.250
3.377
-999.250
-999,250
2.535
-999.250
-999.250
3.500
-999.250
-999.250
3.973
-999.250
-999.250
3.949
-999.250
-999.250
].482
-999.250
-999.250
NNLMUNIC
SFLU
NPHI
FCNL
8FLU
NPHI
~CNL
SFbU
NPHi
~CN6
SFLU
NPHI
~CNL
SFbU
NPHI
fCNL
SFLU
NPHI
~CN6
SFLU
NPHi
FCN6
SFLU
NPHI
FCNL
SFLU
NPHi
FCNL
SfLU
NPHI
FCN6
SFLU
NPHI
FCNL
VALUE
2.568
-999 .~50
-999.250
2.709
-999.250
-999.250
2.879
-999.250
-999.250
4.009
-999.250
-999.250
3.305
-999.250
-999.250
3.889
-999.250
-999.250
2.508
-999.250
-999.250
3.099
-999.250
-999.250
4.000
-999.250
-999.250
3.703
-999.250
-999.250
3.643
-999.250
-999.250
? riO0 o o00
75u 0.
7 q-U(,. 000
7300.00O
12 U 0. (.) t) 0
7 ! OO, 00()
70L, 0.000
o900.000
(-'80U. 000
6700. (')00
(~6(,0. 000
S P
G
G~
5P
RH(.JI5
GR
GP,
PHIJb
G R
SI-'
GR
,.51--
G}~
,,51,'
GR
Htt(JD
YAL
-22l
-999
-999
83
-243
-999
51
-233
-999
-999
-241
-999
-999
58
-207
-999
-999
91
-210
-999
-999
78
-233
-999
-999
-226
-999
-Egg
13
-217
-999
-999
-208
-999
-999
-2%3
-999
-999
b3
U f,
.500
.
.250
.25(~
.75o
.250
.250
.906
.75{/
.250
.250
.65(~
.750
.250
.250
.000
.25O
.250
.813
.875
.250
.250
.b25
.00()
.25<)
.25<;
.375
.500
· 25o
.250
.93,
.
.250
.250
.75O
.750
.25(}
.25o
.750
.00o
.250
.25O
.531
CALl
NRA'I
DT
ILD
CALl
NRA1
DT
CALl
NJ<Al
DT
ILO
CALl
NRAT
UT
ELD
CALi
NRAT
DT
lED
CALl
NRAI
DT
ILD
CAI,,
NRAT
DT
ILD
CALl
N~AT
DT
ILL)
ChbI
NP,,A T
DT
LED
CAI, i
NRAT
DT
ILD
CALl
r~RA r
VAL
4
-999
-999
2
-999
-999
90
Uk
.059
.250
.250
.750
.998
.250
.25n
.150
3.092
-999.250
-999.250
93.000
-999.
-999o
g~.
-999.
-999.
93.
-999.
-999.
92.
-999.
-999.
95.
3~
-999.
-999.
88.
-999.
-999.
94.
.
-99q.
-999.
97.
.
-999.
-999.
91.
025
250
250
188
270
250
250
{75
736
250
250
750
600
250
250
J75
178
250
250
75O
842
250
25O
449
250
250
188
002
250
250
000
DRHO
NCNL
NCNL
IhM
DRHO
NCNL
NCNL
ILM
DRHO
NCNL
iLM
DBHO
NCNL
DRHO
NCNL
ILM
NCNL
DRHO
NCNL
ILM
DRHO
NCNL
UR}tO
NCNL
VALUE
~.602
-999.250
-999.250
].b39
-999.250
-999.250
3.592
-999.250
-999.250
3.670
-999.250
-999.250
4.102
-999.250
-999.250
3.b82
-999.250
-999.250
3.973
-999.250
-999.250
3.713
-999.250
-999.250
4.409
-999.250
-999.250
2.008
-999.250
-999.250
2.734
-999.250
-999.250
MNEMONIC
NPHi
FCNL
SFbU
NPHI
FCNL
SFLU
NPHI
SFLU
NPH1
FCNL
SFLU
NPHI
FCNb
SFhU
mPHI
FCNL
SFLU
NPHI
FCNL
SFLU
NPHI
FCNL
SFLU
NPHI
ECNL
SFbU
NPHi
FCNL
SFLU
NPHi
FCNL
VALUL
5.070
-999.250
-999.250
b.b7b
-999.250
-999.250
5.730
-999.250
-999.250
5.773
-999.250
-999.250
3.896
-999.250
-999.250
3.740
-999.250
-999.250
5.551
-999.250
-999.250
0.078
-999.250
-999.250
5.20~
-999.250
-999.250
~.012
-999.250
-999.250
7.563
-999.250
-999.250
6%O0.000
64O0. 000
6 {t.,O. 000
6200.000
~ 1 oD. 000
~000.000
590(}o000
57(~0.000
5600.000
5500. 000
GH
Gl-'
G~
}~ tltJ b
HH[.)~
HHUP,
SP
Gl-'
RHIJb
}IHiJt5
VA[ BE
-242.0
-999.2
-999.2
68.1
-999.2
-q99.2
59.9
-259
-999
-999
58
-267
-999
-999
-2u2
-999
-q9q
-208
-999
-999
-229
-q99
-999
70
-270
-999
-999
52
-222
-999
-999
85
-299
-999
-999
-24q
-999
-999
66
O0
50
50
2~
O0
50
~8
· 50o
.250
. 25,3
.031
.000
· 250
.250
· 500
.875
· 25o
.250
.~25
.25O
.250
.409
.5o0
.250
.250
.81 t
.250
· 25O
.250
.50o
.250
.25o
.000
.O00
.250
.250
.5q4
.25()
.25,3
.31t
MNEMLJNIC
lbD
CALI
1LO
CALl
NRAT
i LD
CALl
mRAI
OT
IIJD
CALl
NRAT
DI
lbo
CAI~I
NRAI'
DT
ILO
CAb 1
NRAT
DT
II-D
CALl
DT
lbD
CALl
NRAT
DS[
CAbI
NMAI
DT
iLD
CALl
NHAT
DT
ILO
CALl
N?AT
DT
VALUE
2.811
-9~9.250
-~99.250
90.~75
2.234
-999.250
-999.250
101.563
1.757
-999.250
-999.250
96.]75
1.~09
-999.250
-999.250
99.750
2.602
-999.250
-999.250
95.000
2.428
-999.250
-999.250
105.563
t.095
-999.250
-999.250
102.188
2.783
-999.250
-999.250
11~.000
J.477
-999.250
-999.250
105.000
1.140
-999.250
-999.250
109.188
j.102
-999.250
-999.250
107.503
MNEMONIC
DRHO
NCNb
ibm
NCNL
I. LM
~CNL
ILM
NCNb
IbM
DRHO
mCNL
DRHU
NCNb
IbM
DRhO
NCNb
ILM
DI~HO
N C N b
ORHO
NCNL
ILs
~CNb
DRHO
NCNb
VALUE
-999.~50
-999.2.50
2.879
-999.250
-999.250
2.414
-999.250
-999.250
1.070
-999.250
-999.250
~.514
-999.250
-999.250
3.186
-999.250
-999.250
3.447
-999.250
-999.250
2.990
-999.250
-999.250
3.238
-999.250
-999.250
1.486
-999.250
-999.250
3.342
-999.250
-999.250
MNEMONIC
S~ bO
NPHi
~ CNL
SFLU
NPHI
FCNL
SFbU
NPHI
FCNL
SFbU
NPHI
SFLU
NPH1
FCNL
SFLO
NPHi
~CNL
SFLU
NPHI
FCNL
SFLU
NPHI
~CNL
SFLU
NPHI
FCNL
SFbO
NPHi
FCNL
SFLU
NPHI
FCNL
VALUE
7.535
-999,250
-999.250
6.008
-999.250
-999.250
8.195
-999.250
-999.250
5.297
-999.250
-999.250
6.633
-999.2b0
-999.250
6.168
-999.250
-999.250
3.480
-999.250
-999.250
4.023
-999.250
-999.250
3.240
-999.250
-999.250
4.913
-999.250
-999.250
4.330
-999.250
-999.250
5 '4 ()(I.
200. 000
49O0. 000
4~00.000
4700.000
4 ~ 00.000
4500.000
'44 U 0.000
~P
Gl-,
Gk
Bhl]t3
GP
GR
PHtJB
DP
GI~
5F
RHUB
GP
SP
VALOE,
-241.0u0
-999.250
-999.25o
57.875
-Z43.250
-q99.250
-999.250
83.188
-292.50~
-999.250
-q99.25t}
4~.150
'250.5UO
-999.250
'999.250
58.969
-263.000
-999.250
-999.250
53.188
-247.250
-999.250
-999.250
]3.65~
-231.150
-q99.250
-999.25U
-lo4.000
-999.250
-999.250
8~.875
-182.125
-999.250
-999.250
64.375
-16).7b0
-999.250
-999.250
RO.bR8
-187.000
-999.250
-999.25u
54.875
ILD
CALl
NBAI
DT
CALl
NPAT
DT
iLi)
CALl
NRAI
DT
1LD
CAbi
NRAI
Dr
ILD
CALl
NI~AT
DI
ILD
CALl
NRAY
DT
ILD
CALl
VT
ILD
CALl
NRAT
ILD
DT
ILD
CALk
NRA 'r
DT
ILD
CALl
NHAT
VALUE
-999.250
-999.250
1)2.{75
3.422
-999.250
-99g.250
104.56~
1.522
-999.250
-999.250
115.000
].410
-999.250
-99q.250
104.750
1.929
-999.250
-999.250
106.750
1.705
-999.250
-999.250
108.~75
1.867
-99q.250
-999.250
11~.000
4.367
-999.250
-999.250
107.{75
).t58
-999.250
-999.250
110.000
4.039
-999.250
-999.250
11b.563
4.664
-999.250
-999.250
10~.000
M|~I~ M(JN lC
I. CNL
NCNL
IL~
DRttO
~'~C N L
NCNL
DRHO
NCNL
IL~
DRHU
NCNL
1
DNHU
NCNL
DRHO
NCNL
DRHO
NCNL
D~HO
NCNL
DRHO
nCNL
VALUE
5.301
-999.250
-999.250
3.781
-999.250
-999.250
2.02~
-999.250
-999.250
3.768
-999.250
-999.250
2.324
-999.250
=999.250
2.033
-999.250
-999.250
2.309
-999.250
-999.250
4.035
-999.250
-999.250
3.725
-999.250
-999.250
4.297
-999.250
-999.250
5.~67
-999.250
-999.250
MNEMONIC
SFLU
NPHI
FC NL
SFLU
NPfli
FCNL
SFbU
NPHI
~'CNL
SFLU
NPHI
FCNL
SFLU
NPHI
t;CNL
SFhU
NPHi
FCNL
NPHI
FCNL
NPHI
FCNL
SFLU
NPHi
NPHI
FCNL
SFLU
NPHI
FCNL
VALU~
11.594
-999.250
-999.250
4.738
-999.250
-999.250
4.945
-999.250
-999.250
5.418
-999.250
-999.250
4.80)
-999.250
-999.250
4.056
-999.250
-999.250
b.027
-999.250
-999.250
4.72J
-999.250
-999.250
6.277
-999.250
-999.250
5.340
-999.250
-999.250
8.039
-999.250
-999.250
-I tUU. t~OC>
4200.000
4000. nO0
~q(~O. 000
~ 700.0 (')0
~00. 000
~%OU. 000
400. 000
~ JOo. OuO
G R
Ga
GP
G P
GP
SP
SF'
RH~IB
5P
(JR
RHuB
~P
VAL
-lbl
=gE9
-Egg
-18U
-999
-999
54
-158
-999
=999
79
-109
-q99
-999
18
-167
-999
-999
76
UE
·250
· 25o
· 000
.000
.250
·250
.969
· 750
.250
· 25o
.81~
.125
· 25o
.250
.3t5
.250
· ?5O
· 250
-167.500
-999.250
-999.250
76.81~
-lbO.
-999.
-999.
8J.
-194.
-999.
-999.
54.
-159.
-999.
-999.
85.
-lbO.
-999.
-999.
77.
-173.
-999.
-999.
66.
525
25o
81J
500
250
25O
~.~4
250
125
250
250
313
5o0
25O
250
MNE~iUNIC
LLU
CALl
CAhi
DT
iLL
CALl
NHAT
UT
ILL
CALl
N~AY
DT
Ibb
CALl
NRAr
DT
ILD
CALl
NRAT
lbO
CALl
NRAT
DT
iLD
CALl
NRAT
DT
1LD
CALl
D'I
ILL
CALl
NHAT
DT
ILD
CALl
NRAr
DT
VAhUk
5.617
-999.250
-999.250
126.000
4.871
-999.250
-999.250
5.797
-999.250
-999.250
128.500
7.254
-999.250
-999.250
111.000
6.47J
-999.250
-q99.250
122.188
7.617
-999.250
-999.250
117.o00
5.547
-999.250
-999.250
1J4.750
-999.250
-999.250
13].000
4.727
-999.250
-999.250
1~].125
3.2o4
-999.250
-999.250
1~0.~75
2·535
-999.250
-999.250
137.500
~L~
DRHG
NCNb
DRHU
NCNL
DRHU
NCNL
iLM
DRHU
NCNb
IL~
DRHG
NCNL
IbM
DHHU
NCNb
NCNb
1 LN
DRHU
NCNb
1L~
D~HO
NCNb
DHHO
~CNb
NC~L
VALUE
5.090
-999.250
-999.250
5.590
-999.250
-999.250
5·438
-999.250
-999.250
7.145
-q99.250
-999.250
6.523
=999.250
-999.250
7.406
-999.250
-999.250
5.191
-999.250
-999.250
4.531
-999.250
-999.250
4.785
-999.250
-999.250
J.313
-999.250
-999.250
2·717
-999.250
-999.250
MNEMONIC
SFLU
NPHI
FCNL
SFbU
NPM1
FCNb
SFbU
NPHI
fCNL
NPHI
FCNL
SFbO
NPH1
FCNL
~FbU
NPHi
fCNb
SFLU
NPHI
~CNL
8FLU
NPHI
FCNL
8FbU
NP H I
FCNL
8FLU
NPHI
FCNb
SFbU
NPHI
VALUk
5.234
-999.250
-999.250
4.590
-999.250
-999.250
5.9~5
-999.250
-999·250
7·957
-999.250
-999.250
o.90b
-999.250
-999.250
7·88'7
-999.250
-999.250
5.613
-999.250
-999.250
7.074
-999.250
-999.250
5.920
-999.250
-999.250
4.281
-999.250
-999.250
4.508
-999.250
-999.250
30o0.000
2900.000
2~00.
270~.000
2eOo. 006
25e 1. 000
VALUk
-184.875
-999. zSO
-999.250
-196.375
-q99.250
-999.250
42.~75
-189.b25
-999.250
-999.25{)
57.750
-198.875
-999.250
-999.250
34.156
-14~.250
-999,250
-999.250
83.000
-181.500
-999.250
-999.250
59.969
-54.81 ]
-999.250
-999.250
39.750
-954.250
-999.25u
-999.250
-g99.25~;
~NEMLJN lC
1bi)
CALX
NRAI
DT
igD
CALl
NRAT
DT
CALl
NRA~
DT
iLD
CALl
NRAT
1LD
CALl
NRAI
DT
CALl
NRAT
D1
ILD
CAhl
NRAT
CALl
NRAT
DT
2
-99g
-999
1
-999
-999
2
-999
-999
137
4
-999
-999
2
-999
-999
134
-ggg
-999
2000
-999
-999
100
-999
-999
-ggg
-999
.250
.250
.125
.252
.250
.250
.000
.250
.250
.75O
.250
.250
.250
.465
.250
.250
.125
.~58
.250
,250
.000
.000
.250
.250
.563
.250
.250
.250
.250
DRHO
~CNL
DR HO
[~CNL
1LH
DRHO
NCNL
iLM
NCNL
ILM
D~HO
~CNL
D~HU
NCNL
U~HO
NCNk
DRHO
NCNL
VALUE
2.555
-999.250
-999.250
1.416
-999.250
-999.250
2.365
-999.250
-999.250
4.355
-999,250
-999.250
2.295
-999.250
-999.250
2.051
-999.250
-999.250
2000.000
-999,250
-999.250
-999.250
-999.~50
-999.250
MN£MONIC
SFbU
NPH1
fCmL
SFLU
NPHI
FCNL
Sf'LU
NPHI
fCNb
SfbU
iqPHI
FCNb
SFLU
NPHI
FCNL
SFLU
NPH1
FCNL
S~LO
NPHi
FCNb
S~LU
NPHI
fCNL
VALUk
4.551
-999.250
-999.250
2.420
-999.250
-999.250
4.33b
-999.250
-999.250
6.37~
-999.250
-999.250
3.223
-999.250
-999.250
3.758
-999.250
-999.250
1.021
-999.250
-999.250
-999.250
-999.250
-999.250
1024
01
TAPI'. NAMP.,: ~ 10 J2
bF F, V1CL NA~AE: .H l~ ['I
IAPC, CUNIlNUATIiJN
hi'X1 IAPE
('t~MM~
HO/lO/ 4