Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout180-085PLUGGIN & State of Alaska mms~ OZL ~ ~U co-s~v~zo~ co~ussZo~ Memorandum To File: APi No. Well Name Operator Review the well file, and comment on' pluq~ing, well head status, an.d lowcat~on slearance .-,p~vi~e loc. clear, code. Well head ¢~: off: Marker post or plate: Location Cle~ Conclusions Code Signed STATE OF ALASKA ALA'~ OIL AND GAS CONSERVATION ~.,,JMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. StatUs of Well ' ' Classification of Service Well .... [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 80-85 96-046 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20498 4. Location of well at surface"" --~"~  9. Unit or Lease Name 2486' SNL, 450' EWL, SEC. 22, T10N, R15E Prudhoe Bay Unit At top of productive interval 10. Well Number 1753' SNL, 1040' WEL, SEC. 28, T10N, R15E 17-04 At total depth 11. F~eld and peel 2176' SNL, 1351' WEL, SEC. 28, T10N, R15E ... Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 1'6. Lease Designation and Serial No. Pool RKB = 70'I ADL 028334 12' Date Spudded08/28/80 113' DaIeT'D' Reached 114' DateC°mp"Susp"°rAband'115'waterdepth' 'f°ffsh°re 116' N°' °fc°mpleti°ns09/30/80 03/05/96 . N/A MSLI Zero 17. Total DePth (MD+TVD)118. Plug Back Depth (MD+TVD)~19. Directional SUrveY l20. Depth where SSSV set ~1. Thickness of permafrosl 11955 9653 F'~ 1!91.0.... 9618 FT] []y.es ...... ~..N° I N/A MoI 1900'(Approx.) 22. Type 'i=lectric or Other Logs Run DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL, Gyro 23. ' .......... C.A.SING, LINER AND CEMENTING REcoRD .... ' .... "CASING "sETTING DEPTH HOLE SIZE VV'r. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" '" 94# ' H-40 Surface 110' 32" 390 sx Amti'c Set II ...... 13-3/8" 72# L-80 Surface 2606' 17-1/2" 1975 sx Fondu, 400 sx Permafrost II 9-5/8" 47# L-80/S0095 Surface'l 10680,' "1'2'.1/4,, ;800 sx ClaS~"~G', 300 sx Pe'~;mafrost ,C, ... 7" 29# N-80 10360' 11950' 8-1/2" 550 sx Class'G' , , , , , , ...... ,, , , ..... 24. PerforatiOns open to Production '(MD+TVD of'ToP and Bottom 25. ' ....... TUBING RECORD .... .......... and ~nterval, size and number) .... SI'ZE DEPTH SET (MD) PACKER SET (MD) None .........N/A 10321' MD TVD MD TVD , 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. , DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ' ...... 1"08'7'9; ......... P&A,' 18 Bbls Class 'G', Sqzd at 2000 psi 7900' Kickoff Plug, 83 Bbls 'G', Sqzd at 1000 psi 7734' ' .... 2nd K/O Plug, 45 Bbls 'G"i Sqzd at 1 i00 p~i '" 27. PRODUCTION TEST ~Date First ProductiOn IMethod of Operation (Flowmg, gas hft, etc.) Not On Production I. N/A Date of Test Hours Tested" ' PRODUCTION F~R OIL-BBL .... GAS-MCF ' ' ' WATER-BBL CHOKE SIZE I GAS-OIL RA'rlo TEST PERIOD I~ I Fiew Tubing Casing Pressure 3ALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE 28. Geologic-jr'Ma~ ,s '' 30. '~/' Formation Tests 29. .... Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. , , Top Sadlerochit 11136' 9026' Base Sadlerochit 11882' 9596' 131. List o~'Attachments .................. Summary of Dady Drilling Reports 132. I hereby cerbfy that the foregoing is true and correct to the best of my knowledge Signed .... Date ~/, .'/~ ............. T.r./aord~ r~.-! --/ ,--.~. - Title Senior Drilling Engineer ~ ' Prepared By Name/NUmber Terrie Hul~ble, 564-4628 .............. INSTRUCTIONS GENERAL: Th~s form Is designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-sltu combustion. ITEM B.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given ~n other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one ~nterval (mulbple completion), so state in item 16, and in item 24 show the producing intervals for only the ~nterval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. 17-4 DESCRIPTION OF WORK COMPLETED PRE-RIG SIDETRACK CEMENT PLUG & ABANDONMENT 3/5/96: Performed Cement Plugback in preparation for Rig Sidetrack Drilling as follows: MIRU CTU & PT equipment. RIH w/CT nozzle & jetted 335 bbls Hot Crude through the tubing to remove asphaltenes. POOH w/nozzle & swapped to cementing nozzle. RIH w/nozzle loading the well w/Hot Seawater. Tagged PBTD at 11167' MD then PU & pumped 18 bbls of 15.8 ppg Class G cement across the open perforation intervals located at: 11019 - 11043' MD (Sag) 11140 - 11160' MD (Z4) Ref. Log: BHCS 9/30/80. Attained a maximum squeeze pressure of 2000 psi & placed a total of 8 bbls of cement behind pipe. Held 1000 psi final pressure. POOH w/CT leaving an estimated cement top at 10879' MD. RD. 319/96: RIH w/jet cutter & cut the 3-1/2" tubing at 10242' MD. POOH w/cutter. Left the well w/cut tubing and the lower wellbore plugged & abandoned for Rig Sidetracking. SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX ! ARCO Well Name: 17-04A Rig Name: Nabors 2ES AFE: 4J0319 17-04AL1 Accept Date: 03/19/96 Spud Date: 03127/96 Release Date: 05]01/96 Mar 19 1996 (1) Rig moved 100 %. Rigged up Drillfloor / Derrick. Mar 20 1996 (2) Held safety meeting. Rigged up High pressure lines. Rigged up Lubricator, Removed Hanger plug. Held safety meeting. Held drill (Fire). Removed Hanger plug. Freeze protect well - 120 bbl of Diesel. Removed Xmas tree. Rigged up BOP stack. Tested BOP stack. Held safety meeting. Held drill (Fire). Tested BOP stack, Installed Accessories. Tested BOP stack. Repaired Top ram. Mar 21 1996 (3) Tested BOP stack. Removed Tubing hanger. Circulated at 10250 ft. Laid down Tubing of 11250 ft. Held safety meeting. Laid down Tubing of 11250 ft. Rigged up Kelly. Laid down Tubing of 11250 ft. Held safety meeting. Rigged down Tubing handling equipment. Tested Blind ram. Installed Wear bushing. Rigged up subsurface equipment - Cement retainer. Ran Drillpipe to 8245 ft (4.5 in OD). Mar 22 1996 (4) Ran Drillpipe to 8245 ft (4.5 in OD). Set packer at 8245 ft with 0 psi. Tested Cement retainer- Via annulus and string. Circulated at 8245 ft. Held safety meeting. Pulled Drillpipe in stands to 0 ft. Made up BHA no. 2. R.I.H. to 8011 ft. Milled Casing at 8011 ft. Held safety meeting. Milled Casing at 8046 ft. Mar 23 1996 (5) Milled Casing at 8061 ft. Circulated at 8061 ft. Pulled out of hole to 682 ft. Held safety meeting. Pulled BHA. Ran Drillpipe in stands to 7966 ft. Washed to 8161 ft. Circulated at 8161 ft. Held safety meeting. Tested High pressure lines. Mixed and pumped slurry- 38 bbl. Displaced slurry - 133 bbl. Pulled Drillpipe in stands to 7026 ft. Held 1000 psi pressure on 7.5 bbl squeezed cement. Held safety meeting. Serviced Block line. Pulled Drillpipe in stands to 0 ft. Removed Wear bushing. Tested All functions. RECEIVED Operations Summary for(' · ~/'-04A & 17-04AL1 · i Mar 24 1996 (6) Tested All functions. Rigged down High pressure lines. Installed Wear bushinq. Made up BHA no. 3. Held safety meeting. R.I.H. to 7922 ft. Held drill (Kick (well k~il)). Backreamed to 8000 ft. Circulated at 8000 ft. Tested Casing - Via string. Pulled out of hole to 834 ft. Held safety meeting. Pulled BHA. Ran Ddllpipe in stands to 7966 ft. Batch mixed slurry - 45 bbl. Held safety meeting. Mixed and pumped slurry - 45 bbl. Mar 25 1996 (7) Pulled Drillpipe in stands to 6745 ft. Circulated at 6745 ft. Held 1000 psi pressure on 17.5 bbl squeezed cement. Pulled Drillpipe in stands to 0 ft. Held safety meeting, Made up BHA no. 4. R.I.H. to 7676 ft. Drilled cement to 7751 ft. Circulated at 7751 ft. Tested Casing - Via string, Drilled cement to 7900 ft. Circulated at 7900 ft. Pulled out of hole to 7427 ft. Held safety meeting. Serviced Block line. Pulled out of hole to 673 ft. Pulled BHA. Made up BHA no. 5. R.I.H. to 7700 ft. Mar 26 1996 (8) R.I.H. to 7700 ft. Milled Casing at 7745 ft. Circulated at 7745 ft. Pulled out of hole to 678 ft. Pulled BHA. Pulled Drillpipe in stands to 1000 ft. Held safety meeting. Ran Drillpipe in stands to 7845 ft. Washed to 7845 ft. Mar 27 1996 (9) Pulled Drillpipe in stands to 6435 ft. Held 1100 psi pressure on 7.4 bbl squeezed cement. Pulled Drillpipe in stands to 0 ft. Serviced BOP stack. Held safety meeting. Made up BHA no. 6 , R.I,H. to 6403 ft. Serviced Block line. R.I.H, to 7648 ft. Drilled cement to 7722 ft. Held safety meeting. Drilled cement to 7734 ft. Drilled to 7788 ft. Mar 28 1996 (10) Drilled to 8196 ft. Held safety meeting. Circulated at 8196 ft. Pulled out of hole to 7000 ft. Held safety meeting. Pulled out of hole_~to 835 ft, Pulled BHA. Made up BHA no. 7. R.I.H. to 4000 ft. Mar 29 1996 (11) R.I.H. to 8196 ft. Took MWD survey at 8171 ft. Drilled to 8759 ft. Held safety meeting. Circulated at 8759 ft. Pulled out of hole to 7700 ft. Repaired Shaker discharge line. R.I.H. to 8759 ft. Drilled to 8840 ft. Mar 30 1996 (12) Drilled to 9180 ft. Held safety meeting. Drilled to 9747 ft. Circulated at 9747 ft. Held safety meeting. Drilled to 9908 ft. RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend Operabon Shutdown ~ Re-enter suspended well . Alter casing ~ Repair well Plugging x Time extension ~ Sbmul~te Change approved program Pull tubing ~" Variance ~ Pedorate ~ Other .. Plug Back for S~detrack 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2486' FNL, 450' FWL, Section 22, TION, R15E, UM At top of productive interval 1753' FNL, 1040' FEL, Section 28, TION, R15E, UM At effective depth 2176' FNL, 1351' FEL, Section 28, TION, R15E, UM At total depth 2176' FNL, 1351' FEL, Section 28, T1 ON, R 15E, UM 12. Present well condition summary Total depth: 5. Type of Well: Development Exploratory Strahgraphlc Sennce ORIGINAL 6. Datum elevation (DF or KB) KB = 70 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 17-4 9. Permit number 80-85 10. APl number 50- 029-20498 11. Field/Pool Prudhoe Bay Field/Oil Pool measured 11955 feet Plugs (measured) Fill at 11004' MD (6/94) true vertical 9653 feet Effective depth: measured 11004 feet Junk (measured) true vertical 8922 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 20" 390 sx ASII 110' 110' Surface 2567' 13-3/8" 1975 sx Fondu & 400 sx PFII 2606' 2606' Intermediate 10644' 9-5/8" 8oo sx cl 'G' & 300 sx PF C 10680' 8685' Production 10360'- 119~ ~'~ ~" '~ ~ V ~4 9650' Liner 1528' 7' 550 sx Cl 'G' Perforation depth: measured 11019-11043', 11140'-11160' t,~AR 0 4 1oj96 true vertical 8934'-8958', 902959044, AJaska Oi~ & C~.='~s Co,qs. Ccmmiss~ Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT at 40'MD; 3-1/2", 9.3#, L-80, PCT at 104(]9' MD Packers and SSSV (type and measured depth) 9-5/8" Baker 'SAB' pkr at 10321'; 3-1/2" Camco ~RDP' SSSV at 2211' MD 13. Attachments Descnption summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation March 1, 1996 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas~ Suspended~ Service 17. J hereby ~f~ that the f%~g~g~'~gJe and correct to the best of my knowledge. , Si~lned /~_(,,,/,/~~~, Title Sen/or Drillin~ En~Tineer FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ,,-'- Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~)rJglnal Signed By · ii Date I Approva, Approved. Copy BP EXPLORATION ARCO Alaska, Inc. To: ,NDGCC Anchorage Date: March 1, 1996 From: Z. Runje BPX - MB 8-1 SubJect: Well DS 17-4 Sundry ~ Pre-Rig Work: Notify AOGCC prior to commencing with plug-back operations. 1. R/U slick line and RIH to 2211' MD and lock open TRSSSV. POOH with shck hne. 2. R/U CTU and RIH to ~ 5684' and clear hydrates obstruction. POOH with CTU. , R/U cement unit & establish an ~nject~on rate. Bullhead cement and squeeze perforations at 11019' - 11160' MD. Displace to leave the top of cement ~ns~de of 7" liner at no lower then 10919' MD. Pressure test as per AOGCC requirements. ( Total volume of cement should be: 8 bbls ( 7" liner~ 5 bbls will be squeezed away for the total volume of 13 bbls ) NOTE#l: The objective here ~s the following: a. To fill 7" liner up to 100' above the top of perfs. To squeeze away 5 bbls of slurry . R/U E-I.__.._.~ine, tag cmt plug, verify atleast 10919' MD. Pick up and cut 3-1/2" tbg ~ 10250' MD. Freeze protect the top 2200' MD of inner annulus and tbg with d~esel. Bleed off any pressure from tubing and inner / outer annuh. 6. Set BPV & test from below to 1000 psi. Secure well. 7. Remove the well house and flowhnes. If necessary, level the pad and d~g out the cellar. Alaska 0il & ~.-:,.~ Cons. commissio~ We1'1: 17 - 04 Spud DaCe.. 08/28/80 Original RKBE: 70' Top of Formation: 11137' Annular Flu/d: Diesel/SW Reference Log: B~CS API#: 50-029-20498-00 C~letion.- 03/19/88 Hanger Type: FMC Gen III Max Ho]e Angle: 57° 9 MD: 9300' Date:09/30/80 Tie In: Status: Workover Hanger: 27' Angle @ TS:38° Angle ~ //):38° Date: 00/00/00 ALL DEPTHS A~B RKB DRILLIN(~ MD TO TOP OF EOUIPMENT EXCEPT WHER~ NOTED. J DC_ Jeweler ~1 Depth I 40' 2 2211' ~2 3 10306' 4 10321' 5 10396' 6 10408' 7 10409' 10372' 9 10 J-$ ~6,7 C~2 - t~%o9 J-9,10,11 0-3 11 (,7) Crossovt~ 4-1/2' x 3-1/2' 3-1/2' Baknr ~ ~~? 3-1/2' Ot~ ~ Ni~le ~2.75' 3-1/2' ~ ~~C ~ 3-1/2' ~ Tat1 ~ ~ T~I (~ 02/17/89) F~= ~-~-20-~ 3/8' (~sC 02/18/94) FI~= ~P ~ ~ 11130' Fell ~ hole; W/~d (SeC 02/16/94) ~= ~-R-20 (~sC 05/10/89) Ilia ID: 3-1/3" Otil XN II:I,M~I. :1:D-3.75" I 13-3/8' 72t L-80 0' 2606' Casing 2 9-5/8' 479 L-80 0' 10680' Casing 3 7 · 299 L-80 10360' 11950' Liner 4-1/2' 12.69 L-80 0' 40' Tubing-PC 3-1/2' 9.3# L-80 40' 10409' Tubing-PC esi Lift ~D TVD 3020' (3020' 5062' (5014' 7196' (6511' 7937' (7006 8310' (7253' 8688' (7498' 9130' (7766' 9574' (8007' 10194' (8362') Port TI~O Dst® 1/4' 1838 02/18/94 1/4' 1828 02/18/94 3/8' 01LTF 02/18/94 02110/94 Per£oration Data (ELM DEPTHS) (P) Interval Zone FT SPF 1 11019-11023 SAG 4 4 11023-11028 SAG 5 8 11028-11033 SAG 5 12 11033-11039 SAG 6 8 11039-11043 SAG 4 4 11140-11160 4 20 3/4 m. fll~¢ 05/07/89~ SAO 03/17~94 Datum 8700' SS=10802' MD 8800' SS=10937' MD PBTD=11910' TD=11955' 02/17/89 APERF 02/17/89 ~PERF 02/17/89 RP~RF 02/17/89 RP~RF 05/21/82 ZPERF 09/08/89 APERF Revi.ton Date: 03/19/94 Reasc~: GLV 1,2,4; IBP/FISH/FRAC Previous Reason: 02/12/94 600 W. Intem~flMKII AIR)od Road AJ~horacje. AK 99618-1199 ATTN: Sherde NO. 8872 Company: Alaska OII & Gc~ Corm Oomm , Afln: Larry Grant I 3001 Poroupine Drive Anohorage, AK 99601 8/19/94 field: Pmdhoe Bay Well Log Deecflption BL RR Sepia RF Sepia Mylar D:S~.'1-24A IPERF RECORD (7.29J94~)' _ ,, 1 .... 1 ., .D.S. 3-16 ..... PERF RECORD (7-,29-..94) 1 1 :DIS. 3-16 ,,, INJEC? P,ROFILE (7-30-94). 1 1 D.S. 12',17 PROD PROFILE (7-28-94) ..... 1 1 ~D:S. 15-~5 PERF RECORD(7-31.94) .... 1 1 !~).S. 1~-,~ .... PROD PROFILE (7-2994I] ........ 1 1 ~.. 1'30 "' PERF REC~,RD (7.-.29-94) . , , 1 1 ..... Os., .... 12-2, , , PERF REOO ,R~).. ~7.-)0-94~) , 1 1 ~D.S. 12-32 pROD PROfiLE ~'7-28-94) , ,, ~. 15-36 G~R~ooL JEWELRY ~-31.9~ ........ Z).~.' 16.c-,~ ' p~:RF RECORD (7-3 !-94) .. D,,~. 16~9A' ' '. ...... HI,~H RATE INJE¢ PROFILE (7-.~1-94), . , SIGNED: Please sign and return one copy of thi~ transmittal to Sherrle at the above addreM. Thank you. ARCO Alaska, Inc(' Post Office t~ux 100360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 July 21, 1994 Ms. Joan Miller Alaska Oil and Gas Conservation Commission 300 ! Porcupine Drive Anchorage, AK 99501 Re: Well 17-04 Approval Cancellations Dear Ms. Miller: Per our phone conversation of 7/15/94, please cancel the following work Approvals: (1) Permit To Drill - for Rig Sidetracking a new 17-04A wellboro//__~'"~- (Dated 2/93; Approval # 92-150), and 't ~-*-/~'~ . (2) wellbore (Dated 1/93~p/)rova] ~. of Application Sundry -~0r_the Pre-S_'dl.d.~track Plugback 17-04~ Plans to Sidetrack Well 17-04 have been canceled. A successful Hydraulic Refracture Treatment of the Sag River was performed 2/17/94 as an alternative to the Sidetrack. The well is currently producing at about 800 BOPD, 60% Watercut, & 800 GOR. A Report Sundry for the Fracture Treatment has been fried with AOGCC. Sincerely, /~~n ~. Peirce --- Engineering Aide JWP/013 cc. ~/'~. L. Cawvey - (ARCO) - ATO- 1520 CD. A. Cismoski- (ARCO) - ATO- 1509 M. Sloan - {BPX) - Drilling Dept. RECEIVED JL/L 2 5 1994 aaska O~l & Gas Cons. Commission Anchorsge STATE OF ALASKA ALASKA( ~ AND GAS CONSERVATION CO(' ~llSSION REPORT OF SUNDRY WELL OPERATIONS ' i. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull ruing Alter casing 2. Name of Operator ARCO Alaska~ Inc. . 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 , ~ , 4. Location of well at surface 2486' FNL, 450' FWL, Sec. 22, T1 ON, R15E, UM At top of productive interval 1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM At effective depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM At total depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM 12. Present well condition summary Repair well Olher 5. Type of Well Development Exl~oram~y Stral]graph~c JUL 1 1 199¢ Alaska 0il & {;las Con& Commission ~om~o Total depth: measured 11955 feet true vertical 9653 feet Effective depth: measured 11004 feet true vertical 8922 feet 6. Datum of elevaii°n(DF or KB) 70' RKB · 7. Unit or Property Prudhoe Bay Unit feet 8. Well number 17-4 91 'Permit number/apprOval number 8O-85 10. APl number 50 - 029-20498 11. Field/Pool Prudhoe Bay Oil Pool Plugs(measured) Fill @ 11004' MD (6/29/94) ORiGiNAL Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx AS II 110' 110' Sudace 2567' 13-3/8" 1975 sx Fondu & 400 sx PF II 2606' 2606' Production 10644' 9-5/8" 800 sx Cl G & 300 sx PFC 10680' 8685' Liner 1528' 7" 550 sx Cl G 10360-11950' 8474-9650' Perforation depth: measured 11019-11043'; 11140-11160' true vertical 8934-8958'; 9029-9044' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PCT @ 10409' MD Packers and SSSV (type and measured depth) 9-5/8" Baker SAB pkr @ 10321'; 3-1/2" Camco TRDP SSSV @ 2211' MD 13, Stimulation or Cement squeeze summary ' Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. ReDresentative 13~ilv Awr~ ~ ~. prr,~l, ,r~inn n, I~,; ; r, · 17-04 DESCRIPTION OF WORK COMPLETED REFRACTURE TREATMENT OF SAG RIVER 2110/94' RIH & tagged PBTD at 11573' MD. 2/11/94: MIRU CTU & PT equipment. RIH w/CT & pumped Gelled Sand Slurry, containing 7400 lbs of 20/40 mesh sand, to spot a sand plug over the lower perforation interval located at: 11140 - 11160' MD (Z4) Ref. Log: BHCS 9/30/80. POOH w/CT leaving sand back job incomplete due to mechanical problems. Left sand plug top at 11481' MD. Rigged down. 2/12/94: MIRU & PT equipment. RIH & tagged the sand plug top at 11359' MD. Loaded the wellbore w/Seawater, then ran & set an Inflatable Bridge Plug in the 7" liner at 11130' MD (element). POOH. Rigged down. 2/13/94: MIRU CTU & PT equipment. RIH w/CT & pumped gelled sand slurry containing 1700 lbs of 20/40 mesh sand on top of the Bridge Plug, to raise the top of the sand plug to 11055' MD. Made final top of sand plug tag at 11070' MD. POOH w/CT. Rigged down. 2/16/94: RIH & tagged the top of the sand plug at 11063' MD. 2/17/94' MIRU & PT equipment to 9000 psi. Pumped a Hydraulic Refracture Treatment using 16/20 mesh proppant, through the top pedorations located above the sand plug at: 11019 - 11043' MD (Sag) Ref. Log: BHCS 9/30/80. Pumped 200 bbls 20# Pre Pad Gel @ 35 bpm, followed by Shutdown. ISIP @ 2233. Resumed pumping Data Frac consisting of 300 bbls 50# Crosslinked Gel @ 35 bpm, followed by 109 bbls Flush @ 35 bpm, followed by Shutdown. ISIP @ 2526 psi. Resumed pumping the Fracture Treatment consisting of 950 bbls 40# Crosslinked Gelled Pad @ 30 bpm, followed by 655 bbls Slurry w/proppant concentrations @ 1 - 6 ppg, followed by 108 bbls Flush, followed by Shutdown. Placed a total of 81,800 lbs of proppant into the formation. Rigged down. ARCO Aluka, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-20-93 REFERENCE: ARCO CASED HOLE FINALS 1-28 3~'~ %-18-93 3-25A ~]'~3 6-17-93 3-31 f~-?z 6-16-93 3-32 ~ ~/-/~? 6-15-93 3-33 t ~- ~o 6-16-93 4-8 ?~-,o 6-11-93 5-14 ??-J3 6-12-93 6-22A ~ I.~6-6-93 6-22A ' -6-10-93 7-25 ~-Y [. 6-6-93 9-44 f ~ -~ z~6.6.93 11-18 f~-~z6-7-93 14-6 ~'f~- ~6-8-93 14-8 7~-/,? 6-10-93 14-13 ~t~]016-13-93 14-15 ;F~ 6-8-93 16-4A tz-I¢, 6-9-93 16-17 ~ff- zz'6-14-93 16-31 ~ ~,-~ [ 6-7-93 17-4 ~~ 6-14-93 AGI-5 ~-~'-6-13-93 AGI-6 ?~-o~ 6-14-93 AGI-7 · _6-8-93 AGI-7 } {~'r!6-15-93 AGI-7 6-17-93 Prod Profile Run 1, 5" Sch Completion Record Run 1, 5" Sch Plug Setting Record R-_n 1, 5" Sch Plug Setting Record R-- 1, 5" Sch Plug Setting Record Run 1, 5" Sch Per/Record R.~ 1, 5" Sch TBG Cutter Record Run 1, 5" Sch Leak Detect R~m I 2" Sch Leak Detect Run 1, 5" Sch Per/Record Run 1, 5" Sch Per/Record Run 1, 5" Sch Production Log Run 1, 5" Sch PITS/Leak Detect Ru_- 1, 5" Sch Leak Detect Run 1, 2'&5'* Sch Inj Profile R-n 1, 5" Sch Completion Record R-n 1, 5" Sch Prod Profile Run 1, 1'&5' Sch Gas Lift Run 1, 2"&5" Sch Per/Record R-- 1, 5" Sch Production Log R-_~ 1, 5" Sch Completion Record Run 1, 5" Sch Completion Record Run 1, 5" Sch GR/CCL Run 1, 5" Sch Completion Record Run 1, 5" Sch Per/Record Run 1, 5" Sch GR/(XX, Run 1, 5" Sch 1, 5" AGI-8 ~3-33,,6-9-93 AGI-9 ~.~ 6-9-93 6-17-93  CA//CCL Run 1, 5" Sch AGI- ~ Per/Record R;;- Sch return receipt RECEIVED B' Have A Nice Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON #BPX # STATE OF ALASKA The correct A~# for 3-32 is 50-029-21141-00. ARCO Alaska, Inc. P.O.Boz 100360 Anchorage, Alaska 99510 DATE: 3-15-93 REFERENCE: ARCO CASED HOLE FINALS ~-58T 12-1-92 DSN Run 1, (~'71o~ ~0_~_/3~ 12-14-92 In# Profile Rim 1, 12-29~2 In# Profile Run 1, 5-2-92 TMD Rim 1, 12-13~92 Prod Proffie Run 1. -25 12.13-92 Prod Profile lhm 1, ~ 1-17-93 Set Baker mP/CCL Run 1. 14-5A 1-7-93 Prod Profile lh_m 1, ~14-11 11-23-92 Gas Lift Run 1, 17-4 12-12-92 Temperature Rim 1, fY' Camco Camco Camco Camco Please sign and return the attached copy as receipt of data. Have A Nice Day! Sonya Wallace ATO- 1529 APPROVED__~___ Trans# 93032 # CENTRAL FILES # CHEVRON D&M # LUCILLE JOHNSTON # EXXON MARATHON # MOBIL # PHILLIPS PB WELL ~ R&D # BPX # STATE OF ALASKA STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS ,JN APPLICATION FOR SUNDRY APPROV 1. Type of Request: Abandon x Suspend ~ Operaaon Shutdown ~ Re-enter suspended well . ~ Alter casing ~ Repar well Pluggmng x Time exten~on Samulate / Change approved program ~ ----~11 tubing ~ Vanance ~ P~a~e ~ ~ x~'.P~. ~back for Redrill 2. Name of Operator ~ 5. Type of Well: 6. Datum elevation -(~F~ KB) ARCO Alaska, Inc. I Dev~opment x ~ K~ ,- 70 feet Exploratory ~. 3. Address Sa'al~graph~c 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Ser~ce Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2486' FNL, 450' FWL, Section 22, TION, R15E, UM DS 17-4 At top of productive interval 9. Permit number 1753' FNL, 1040' FEL, Section 28, TION, R15E, UM 80-85 At effective depth 101 APl number 2176' FNL, 1351' FEL, Section 28, TION, R15E, UM 50- 029-20498 At total depth 11. Field/Pool 2176' FNL, 1351' FEL, Section 28, TI ON, R15E, UM Prudhoe Bay Field~Oil Pool 12. Present well condition summary Total depth: measured 11955 feet Plugs (measured) true vertical 9653 feet Effective depth: measured 11910 feet Junk (measured) true vertical 9618 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth 80' 20" 390 sx ASII 110' 110' 2567' 13-3/8" 1975 sx Fondu & 400 sx PFII 2606' 2606' 10644' 9-5/8" 800sxCl'G'&3OOsxPFC 10680' 8685' 1528' 7" 550 SX CI ~' measured 11019-11043', 11140'-11160' true vertical 8934'-8958', 9029'-9044' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 @ 10409' DEC 2 2 1992 Alaska Oil & Gas Cons. uummission Anchorage Packers and SSSV (type and measured depth) 9-5/8" Baker 'SAB' pkr @ 10321 ? 3-1/2" Camco 'TRDP' SSS V @ 2211' r 13. Attachments Description summary of proposal x Detailed operations program BOP sketch _z__ 14. Estimated date for commencing operation February 1, 1993 16. If proposal was verbally approved 15. Status of well classification as: Oil x Gas Suspended for 17-4A REDRILL Procedure Outline: (Refer to attached wellbore schematic) 1. Notify an AOGCC representative pdor to commencing operations. . Rig up coiled tubing unit. RIH circulating seawater to kill the well. RIH to current PBTD of 11,614' MD (9/89 TD tag). Lay a cement plug from this PBTD leaving the top of the cement plug at 10,910' MD (100' above the top perforation) or higher. 3. RU slickline unit. RIH and confirm cement top at least 100' above top perforations. Note' Tag to be witnessed by AOGCC representative. 4. RU E-line and make a tubing cut at +/-8700' MD. , Circulate well over to seawater removing all hydrocarbons from the wellbore and freeze protect tubing and annulus to 2000'. 6. Bleed tubing, inner annulus, and outer annulus to 0 psi. 7~ . . 10. Set 4-1/2" BPV. Remove the well house and flowlines. Level the pad and dig out the cellar. Prepare pad for RWO. MIRU workover rig. Pull 4-1/2"/3-1/2" tubing. RIH and set a 9-5/8" bridge plug at 8,580' MD. ~ · ~ After milling a section out of the 9-5/8" casing from 83~0' - 8380' MD, a kick-off plug will be set with the base of the kick-off plug to be +/- 8480' MD. Note: This is consistant with the plugback waiver memo 4/15/92 granted for the Prudhoe Bay field sidetracks and redrills. RECEIVED DEC 2 2 1992 Alaska Oil & Gas Cons. Comrmss'~, Anchorage BASED ON ENGINEER~~ EP.-?'.~o,J DEPT. APP'VL ENGINEERING DATA BUISN~ETIAFE NO. DATE ~ FILE NO. SHEET NO.~ OF~ ' 'I RECEIVEC / /// / / / / __.......--.----- /1II/ / / /// 1111 DEC 2 2 1992 Alaska Oil & ~as Cons. Commiss.. Anchorage DOYON 16 13 5/8" 5,000 psi Stack 10.15 4.5 5.02 1.02 1.80 2.35 0.25 GROUND I I"% Ir'"'l "' RKB ~ J I I HYDRIL ~FLO Variable 3.5"x 6" Pipe Ram 12.40 Variable 4.5"x 7L" Pipe Ram MUD CROSS R 15.40 17.60 Blind Ram TBG SPOOL SPOOL 20.70 24.85 25.10 RECF. IVE ? STATE OF ALASKA ' ALASKA/' ._A. ND GAS CONSERVATION CC(' /llSSION ' REPORT L,r- SUNDRY WELL OPERATIONS 1. Operations performed: Operat=n shutdown Stimulate X Plugging Perforate X 2. Name of Operator Pull ruling ,..._ Alter casing .--.-, Repair well ARCO A~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 3061' FNL, 1104' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 2555' FNL, 1973' FEL, Sec. 15, T10N, R15E, UM At effective depth 2433' FNL, 1863' FEL, Sec. 15, T10N, R15E, UM At total depth 2409' FNL, 1841' FEL, Sec. 15, T10N, R15E, UM 12. Present well condition summary ~Well Development X~ Exploratory Stral]graph~c J. Serwce Total depth: measured 12137 feet true vertical 9182 feet o~ x__ 6. Datum of elevation(DF or KB) feet 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-14 9. Permit number/approval number 84-166 10. APl number 50 - 029-21190 ,, 11. Field/Pool Prudhoe Bay Oil Pool Plugs(measured) 11896' MD; 8974' TVD Effective depth: measured 11896 feet true vertical 8974 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1870# Poleset 110' 110' Surface 2463' 13-3/8" 2000 sx CS III & 400 sx CS II 2497' 2497' Production 11520' 9-5/8" 550 sx Cl 'G' & 300 sx CS I 11554' 8672' Liner 821' 7" 364 sx Cl 'G' 11285-12106, 8435-9155' Perforation depth: measured 11640-11662'; 11747-11780'; 11780-11820'; 11830-11870'; 11870-11887';[isolated below bddge plug: 11922-11936'; 11939-11943'; 11971-11981 '] true vertical 8751-8770'; 8845-8874'; 8874-8908'; 8917-8952'; 8952-8966' [isolated below bridge plug; 8996-9009'; 9011-9015'; 9039-9047'] Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 11277' MD; 4-1/2", 12.6#, L-80, PCT tail @ 11375' MD Packers and SSSV (type and measured depth) Baker FB-1 packer @ 11257' MD; 5-1/2", Camco - 13. Stimulation or cement squeeze summary Ba~ Intervals treated(measured) See attached APR u 9 ]9,91 : Treatment description including volumes used and final pressure A[as~(a Oil & Gas Cons. C0mm_issI~ 14."-'~--~'~ ~Q.,~.,~.~:~tive r)ailv Avc, r~ ~ Prnrh~r, tinn nr Ini,-.,t..~,~ r,, + =~'~-~'=~~'"' DS 17-14 DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF SAG RIVER & ZONE 4 12/10/90: MIRU & PT equipment to 4000 psi. at 11,896' MD (top of plug), to isolate pedorations below plug at: 11922 - 11936' MD (Z3) 11939 - 11943' MD (Z3) 11971 - 11981' MD (Z3) RIH w/CT mounted Inflatable Bridge Plug & set POOH. RD. Flowed well. Ref. Log: LSS 12/21/84. I 2/1 3/90: RIH w/dump bailer & dumped 5' of 20/40 sand on top of bridge plug. Ref. Log: LSS 12/21/84. I 2/27/90: Reperforated: 11780 - 11820' MD (Z4) 11830 - 11870' MD (Z4) I/6/9 1: MIRU & PT equipment to 7500 psi. perforations above the bridge plug at: Pumped: 11640 - 11662' MD (Sag) 11747 - 11780' MD (Z4) 11780 - 11820' MD (Z4) 11830 - 11870' MD (Z4) 11870 - 11887' MD (Z4) POOH. RD. Pumped a Propped Fracture Treatment through Ref. Log: LSS 12/21/84. a) 300 bbls Pre Pad, @ 50 bpm & 4500 psi, followed by b) Shutdown. ISIP @ 1420. Resumed pumping: c) 4850 bbls Pad, @ 50 bpm & 4750 psi, followed by d) 1830 bbls Slurry, at 2 - 12 ppg proppant concentrations, followed by e) 270 bbls Flush, followed by f) Shutdown. ISIP @ 2600. Placed a total of 340,360 lbs of proppant into the formation. 1/11/91 - 3/3/91: Performed proppant fill cleanouts & intermittently flowed well. 3/22/91 .' Pumped a scale inhibition treatment. Rigged down. Returned well to fulltime prorll,~tinn ~ nht'-in,,~l ,-,,,,~=4 ,.,,,11,,, ARCO ALASKA, INC. F'~O. BOX 100360 i ANCHORAGE, ALASKA 995t DATE tt-27-89 REFERENCE' ARCO CASED HOLE FINRL£ ~-34 ~0-t4-89 ~-2e ~0-25-89 /'~-27 8-26-8? fS-i ti-9-89 ~ 5-27 ~-4-89 co-J ~-2-89 -?A t0-25-89 ~?-~? t8-25-89 ~?-2~ ~7-30 t~-5'-89 7-33 ~-~-8~ ~ 9-~ ~ 0-27-89 · 9-t ~ ~ 0-28-89 ~-28 . 9-38 ~- ~-~ ~0-27-8~ ~,~2-~ PRODUCTION PROFILE GAMMA D~N F'ERF RECORD COLLARzPERF/PACKER CBT FM FEMF' PRODUCTION PROFILE PRODUCFION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE INJECTION PROFILE F'IT~ PITS PITS INJECTION F'ROFILE/IE~F' F'RODUCTION F'ROFiLE LEAK DETECTION TEMP/GR PERF RECORD F'ERF RECORD F'RODUCTION PROFiLE/LEAK DET. LEAK DETECTION CCL/TEMP iNJECTIUN F'ROFILE COLLAR/PERF FUBiNG CUTTER TEMF' CNL PERF RECORD RUN RUN RUN RUN i, RUN RUN RUN RUN t, RUN i, RU~ i, RUN t, RUN PUN NUN i, RUN t, KUN RUN t, RUN l, RUN i, RUN i, RUN t, RUN i, RUN t, RUN t, RUN NUN RUN 1, RUN i, RUN 1, PLEASE SIGN AND RETUjRN THE A'FTACHED RECEIVED BY . HAVE A NICE DAY! NOV 01989 SALLY HOFFECKER A T O- i 5 2 9 Alaska 0il & Gas Cons. Commissioa Anchorage COPY AS RECEIF'F OF DATA. 5' 5" 5" 5' 5' 5' :?'&5 · ""&5" 5" 5" 2"&5" 5" 5' 2"&5" 2"&5" 5" 5" 5" 2" 5' 5" CAt~Cu HL,£ HL£ AiLRS '2.'C1-1 bA~CO CAMCO CA;lC(] CAt'~CO CAMCt] CA t'l'-- Hi;cZ l-IR2 HI'(:,.,' CA~CO CANCO CA,CO CAMCO SCH CAMuO CAMCO [,At~CO CA~'~O ATLAZ A ~I_AZ CAMCO HLZ DT~TRTRIITI'FIN ARCO ALASKA, INC. F'.O. BOX i00360 ANCHORAGE, ALASKA DATE' REFERENCE' ARCO CASED HOLE FINALS t-4 t -6 t 0-22-89 ~-6 t,D-2~ -89 ~ -~ 6 t ~-~ 6-89 t -~ 7 ~ ~-~ 9-89 I -23 J ~-2~-89 1 -2~ t e-t 4-89 2-~ J e-~ 8-89 2-t 2 t e.-J ~-89 ~ ~5 J e-25-89 4--s2 I e-2~-8~ ~4-52 ~ e-25-89 ~7- ~ 3 I ¢- ~ 6-89 9-5 J ~-~ ~-89 9-~6 ~8-t ~-89 ~ ~-~ 2 I 8-7--89 t t -t 5 t 8-t 3-89 ~ 4-23 ~ 8-~ 4-89 ~ 6-~ J ~ ~-J 3-89 ~ 6-2~ ~ ~-4-89 t 7-4 t 8-~ 4-89 ~ 8-J 6 9-~ 8-89 PI_EASE SIGN AND PRODUCTION PROFILE CNL-GR F'DK-t 80/GR/CCL PRODUCTION PROFILE PERF RECORD CNL-GR PRODUCTION PROFILE PRODUCTION PROFILE F'RODUCIION F'ROFILE CNL I'EMP SURVEY CNL-GR CNL-GR F'DK-I (~¢/GR/CCL F'RODUCTiON F'ROFILE PRODUCTION PROFILE INJECTION F'ROFILE F'RODUCf'iON PROFiI_E TEMP COMF'LETION RECORD LEAK DETECTION TEMF' PRODUCTION F'ROFILE PITS - RETURN THE ATTACHED RUN t, 5" RUN ~, 5" RUN l, 5" RUN i, 5" RUN ~, 5" RUN i, 5" RUN 1, 5" RUN t, 5" RUN t , 5" RUN 2, RUN t, RUN t, 5" RUN t, 5' RUN t, kUN i, 5" RUN i, RUN i, 5" RUN i, RUN 1, 2"&5" RUN RUN t, 2" RUN t, 5" RUN t, 5" RUN COF'Y AS RECEIF'T OF' DAIA. RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-~529 CAMCO AFLA~ ATLA.~ CAMCO SCH ATLA.2 CAMCO CAMCO CA,cO ~CH CAMCO Al'LAY ATLAS Af'LA~ CAMCO CAMCO CAMCO CAMCO CAMCO SCH CAMCO CAMCO CAMCO CAMCO DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARA1HON MOBIL * TEIE CORRECI'ED AP]:$ FOR 2-25 ** THE C[tRRF~CTFT1 AF'r$ FOR i4-? PHILLIPS F'B WELL FILES R & D p B X S~lATE OF ALASKA TEXACO (...,,/ Alns Oil & Cons. Commi i.n ARCO Alaska, Inc.~ Prudhoe Bay .--n=,..~eering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 8, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-4 Approval No. 8-364 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/RAC/jp Attachment cc: J.S. Dietz, BP J. Gruber, ATO-1478 PI(DS 17-4) Wl-3 RECEIVED ~\~aska 0ii & Gas Cons. CommissToti Anchorage I " ALASK.~ STATE OF ALASKA \ND GAS CONSERVATION C{r ~SION REPORT ur SUNDRY WELL OPEhATIONS 1. Operations performed: Operation shutdown .--. Stimulate X Pluggmng Perforate 2 Name of Operator Pull tubing ~ ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface Alter casing ~ Repmr well ~Well Development ~ 1 Exploratory ..--. Straagraph.:: .---- 2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM At top of produchve interval 1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM At effective depth At total depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM 12. Present well condition summary Total depth: measured 11955 feet true vertical 9654 feet Effective depth: measured 11019 feet true vertical 8934 feet Casing Length Size Conductor 110' 20" Sudace 2536' 13-3/8" Production 10610' 9-5/8" Liner 1590' 7" Plugs(measured) Other 6. Datum of elevabon(DF or KB) 70 RKB 7 Unit or Property Prudhoe Bay Unit 8. Well number 17-4 9. Permit number/approval number 80-85/8-364 10. APl number 50 - 029-20498 11 Field/Pool Prudhoe Bay Oil Pool feet Junk(measured) Cemented Measured depth True vertical depth 300 SX Permafrost 110' 110' 1975 sx Fondu & 400 sx 2606' 2606' Permafrost 500 sx Class G 10680' 8685' 550 sx Class G 11950' 9650' Perforation depth: measured 11019-11023'; 11023-11028'; 11028-11033'; 11033-11039'; 11039-11043' true vertical 8934-8937'; 8937-8941'; 8941-8945'; 8945-8950'; 8950-8953' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PC tail @ 10409' MD Packers and SSRV (tvn~ and m.--. ,,r .~ , ., , n , ,-,- ( DS 17-4 Sag River Fracture Treatment Post Job Summary Sequence of Events: 1. Rig up Halliburton for frac on 2/24/89. 2. Pressure tubing by casing annulus to 3000 psig. 3. Pump formation breakdown stage to the Sag River formation perfs 11019'- 11043' MD'(referenced to BHCS log dated 9/30/80). Pump rate 17 bpm at 5300 psig: 20 bbl of 50% xylene and 50% diesel with 10% Musol A 111 bbl slickwater Shutdown for ISIP. 4. Pump 90 bbl slickwater pump-in/shut-in stage at 20 bpm and 6000 psig. Shut down for ISIP. Perf friction too high. Decided to pump acid breakdown. 5. Pump acid breakdown treatment at 10 to 12 bpm at 4400 to 4600 psig consisting of: 12 bbl xylene 48 bbl 12% HCl with ballsealers 48 bbl 6% HCI-1 1/2% Mud Acid with ballsealers 120 bbl 2% NH4CI Water 6. Pump 80 bbl slickwater pump-in/shut-in stage at 20 bpm and 5600 psig. Shutdown for ISIP. Perf friction still too high, fracture cancelled. 7. Rig up ARCO pump truck on 5/4/89. Pump injectivity test with 150 bbl methanol/water at up to 7.6 bpm and 3450 psig. . 10. 11. 12. 13. 14. 15. Rig up BJ Titan on 5/7/89 for second frac attempt. Pressure annulus to 3000 psig. Pump 20 bbl of 50% xylene and 50% diesel with 10% Musol A at 5 bpm and 2600 psig. Pump 116 bbl slickwater formation breakdown stage. Pump rate 20 bpm at 5400 Shutdown for ISIP. Pump 73 bbl slickwater pump-in/shut-in stage at 20 bpm and 4900 psig. Pump propped fracture treatment at 20 to 23 bpm and pressures ranging from 4300 to 5200 psig. Pumped 253 bbl of pad, 114 bbl of slurry with proppant concentrations of 1 to 11 ppg, and 49 bbl of flush. RDMO BJ Titan. MIRU slickline unit on 5/8/89 and changeout dummy valves for gas lift valves. MIRU coil tubing unit and cleanout proppant on 5/20/89. ARCO Alaska, In4 Prudhoe BI~, .~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager July 11, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-4 Permit No. 80-85 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/MJF/nmh Attachment cc: T.B. Gray, BP Exploration J. Gruber- ATO 1478 PI(DS 17-4)W1-3 RECEIVED JUL 1 8 Alaska Oil & Gas Cons. Anchorage STATE OF ALASKA ALASK( ~ILAND GAS CONSERVATION (3( IMISSION APPLICA rlON FOR SUNDRY APPROVALS 1. Type of Request: Abandon ... d Operalmn shutdown , , Re-enter suspended well ...... Alter camng Repmr well Plugging . T~me extenmon S1]mulate Change approved program Pull tubing Vanance Perfor----~te X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Strat~jraph~c Ser~ce Other 6. Datum of elevation(DF or KB) 70 feet 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 2486' FNL, 450' FWL, Sec. 22, T10N, R15N, UM At top of productive interval 1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM At effective depth At total depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM 8. Well number DS 17-4 9. Permit number 80-85 10. APl number 50 - 029-20498 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11955 feet Plugs(measured) 9654 feet Effective depth: measured 11019 feet true vertical 8934 feet Junk(measured) Casing Length Size Cemented Conductor 110' 20" 300 sx Permafrost Sudace 2606' 13-3/8" 1975 sx Fondu & 400 sx Permafrost II Production 10680' 9-5/8" 500 sx Class G Liner 1590' 7" 550 sx Class G Measured depth Trueve~icalde~h 110' 110' 2606' 2606' 10680' 8678' 10360'-11950' 8493'-9650' Perforation depth: measured 11019'-11024', 11024'-11029', 11029'-11039' true vertical 8934'-8948.8' (3 intervals) Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, PC tubing to 10409' MD RECEIVED LIUL ! 8 ]989 Alaska 0il & Gas Cons. Comm[ssi0n Anchorage Packers and SSSV (type and measured depth) Baker SAB Packer @ 10321' MD; Camco TRDP-1A-SSA SSSV @ 2211' MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X~ 14. Estimated date for commencing operation July, 1989 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. .S.i~ned 2~'/,~ ~) .~ ~ Title Operations Engineering Manager FOR COMMISSION u~: ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- O'RIGINAL SIGNED BY I i'"T&ll~llr''' ~ 15. Status of well classification as: Suspended IAppr°val N°' ¢ -- ~:~~ Approved Copy R~eturne~ Drill Site 17-4 ARCO Alaska, Inc. proposes to perforate at selective intervals within the Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be flowed for clean-up. All wireline work will be done through a 5000 psi WOP/BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The well is currently SI. Produced fluids will be in the wellbore during perforating operations. These reperforations are in the Ivishak Zone. Expected static bottom hole pressuer: 3850 psi. Perforation Interval (Ivishak) BHCS Depth ('MD) Depth ('SS) 11140-11160 8960-8975 Alaska 0il & Gas Cons. Comrn'~ss~on 1. 5000 PSI 7" W[LLH[.,AD CONNECTOR IrLAt~GE 2. 5000 PSI WIRI[LIN£ RAMS (VARIABL[ $1Z£) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PS~ 4 1/6" FLOW TUB[ PACK-OFF I,I ! REL ! NE Bop, EOUI, PHEN? ARCO Alaska, Inc.( Prudhoe Ba~)._ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager ORIGI June 28, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-4 Approval No. 8-'SC~ Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DRR/jp Attachment CC: T. B. Gray, BP J. Gruber, ATO-1478 PI(DS 17-4) W1-3 RECEIVED JUL-3 1989 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc ,s a Subs,d;ary of Atlant,cR,chheldCompany AR3B--6132-C STATE Of ALASKA ALASK~ LAND GAS CONSERVATION C~ MISSION REPORTUF SUNDRY WELL OP'I:RATIONS 1. Operations performed: Operation shutdown Sttmulate X Plugging Perforate Pull tubing Alter camng Repmr well Olher 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM At effective depth At total depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM 12. Present well condition summary Total depth: measured true vertical 5. Type of Well Development Exploratory Stra~graph~c 11955 feet Plugs(measured) 9654 feet x 6. Datum of elevation(DF or KB) 70 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-4 9. Permit number/approval number 80-85/8-369- ~ ~ 10. APl number 50 - 029-20498 11. Field/Pool : Prudhoe Bay Oil Pool feet Effective depth: measured 11910 feet true vertical 9618 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 390 sx AS II 110' 110' Surface 2536' 13-3/8" 1975 sx Fondu & 2606' 2606' 400 sx Permafrost II Production 10610' 9-5/8" 800 sx Cl 'G' & 300 sx PFC 10680' 88685' Liner 1590' 7" 550 sx CI 'G' 11950' 9650' Perforation depth: measured 11019-11023'; 11023-11028'; 11028-11033'; 11033-11039'; 11039-11043' true vertical 8934-8937'; 8937-8941'; 8941-8945'; 8945-8950'; 8950-8953' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 40' MD; 3-1/2", 9.3#, L-80, PCT tail @ 10409' MD Packers and SSSV (type and measured depth) Baker SAB packer # 10321' MD; Camco TRDP-1A-SSA SSSV @ 2211' MD 13. Stimulation or cement squeeze summary R L. ~ C E IV E i~r~l Intervals treated(measured) See attached Treatment description including volumes used and final pressure J U L - 1989 14. Representative Paily Avem, ge Production or Injection I~d~ka -' OiI-Bbl Gas-Md Water-Bbl - Casing Pressu~C~J'lch°rag~'ubing Pressure Prior to well operation Subsequent to operation o 0 0 0 0 o 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil ~ Gas w Suspended .__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 24:~~)2~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 078 D. R. Reimers, 265-6205 SUBMIT IN DUPLICATE ( ( 17-4 SAG RIVER FRACTURE TREATMENT DE$1~RIPTION OF I~QNDI, II~TED WORK Arco Alaska Inc. conducted a sand propped hydraulic fracture treatment on well 17-4 The treatment was initiated with a small prepad to breakdown the interval and to determine fracture properties. The main fracture treatment consisted of pumping a 250 Bbl. pad followed with the sand slurry. An outline of conducted work is included as follows: May 7, 1989 1.) Rigged up B. J. Titan pump equipment and sand transport. Gelled fracture fluid on location. Installed tree saver. Pressure tested surface lines to 6500 psi. Maintained 3000 psi on 3 1/2" by 9 5/8" annulus during fracture treatment. 2.) Pumped prepad breakdown treatment as follows: 20 Bbls. 50/50 Diesel/Xylene with 10% mutual solvent 116 Bbls. 10 lb. gelled water. The prepad treatment was pumped at an average rate of 20 BPM at an injection pressure of 5500 psi. Used to determine fracture closure pressure, perforation friction and fracture gradient. 3.) The sand propped fracture treatment consisted of the following: 252 Bbls. 40 lb gelled water with 40 lbs/1000 gal oil soluble resin (fluid loss additive) 109 Bbls. 40 lb. gelled water.with 16-20 Carbolite sand ramping from 2 ppg to 10 ppg. 48 Bbls. Diesel flush The treatment had been designed to pump a total of 29,600 lbs of proppant. During the treatment a sand screen out at the tub on the blender occurred. A total of 22,000 lbs of sand was pumped however only 5300 lbs was placed through the perforations before the treatment screened out. RECEIVED J U L - 3 1989 Alaska 0il & Gas Cons. Gommissio~ DATE' 2-23-89 REFEPENCE' ARCO CASED HOLE FINALS 3-30 2-3-89 COLLAR,-' F'ERF t -1 ;5 '~-! 7-89 COLLMF/PEN,~ 2-5TM 2-'1 8-89 CBT 2-3T:' 2-i 8-89 CE i' 7-4 2-'i 7-8':;' COLLARz PERF 8-o, ,.'~-1 ,.."~-89 PERF RECOF'D 8-23 2-i 7-8° CBT 8-25 2-1 7-89 CET 8-25 2-1 7-89 GN-CCL PLEASE N AND RETURN THE ATTACHED CUF'Y A RUN I, 5" RU~ i, 5" RUN '1, 5" PUN i, 'II " R_N 1, _ RUN 'i , 5" RUN Pud t , 5" RUN 1 , 5" ECEIF'[ OF DAFA. A I-IAi 5 CI--t $ C H ~ CH RECE].VED B'~ HAVE A NICE DAY' ZALL_Y HOFFECKEP ATO-t 529 TRAN£ APF'RO ED DI$1RIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON ~ARATHON MOBIL ¢- PHILLIPS PB WELL FILES R & D ~ SAPC · ¢ $IAYE OF ALAS'KA ~-"- I'E:XACO J ARCO Alaska, Inc. [, Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager November 4, 1988 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Comission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: RE: DS 17-4 Permit Number: 80-85 Enclosed is the Application for Sundry Notice detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JYJ:sd Enclosures cc: Standard Alaska Production Company JoAnn Gruber, ATO 1478 File PI(DS17-4)W1-3 RECEIVED NOV u 8 1988 Alaska 0il & Gas Cons. Commission ~,nch0rage ARCO Alaska, Inc ,s a Subsidiary of AtlanhcR~chf,eldCompany AR3B--6132-C~ (° STATE OF ALASKA ( ALASK~ OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend Operation shutdown Alter casing Repair well Plugging Change approved program ~Pull tubing Re-enter suspended well Time extension Stimulate Variance Perforate x Other 2 Name of Operator ARCO Alaska. Inc. 3. Address P.O. BOX 100360 Anch, AK 99510 5. Type of Well: Development _x_ Exploratory Stratigraphic Service . Location of well at surface 2486'FNL, 450'FWL, Sec. 22, T10N, R15E, UM At top ot procluctwe interval 1753'FNL, 1040'FEL, Sec. 28, T10N, R15E, UM At ettect~ve 0eptl~ At total depth __2176'FNL, 1351'FEL. Sec. 28. T10N. R15E. UM 6. Datum elevation (DF or KB) 70 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 17-4 9.--Permit number i 80-85__ 110. APl number 50-029-204908 11. Field/Pool Prudhoe Bay Oil Pool. feet 12. Present well condition summary: Total depth: measured Effective depth: Casing Structural Conductor Surface 1 1 955 feet Plugs (meaf ~red) true vertical 9654 feet measured 1 1 01 9 feet Junk (measured) true vertical 8934 feet Length Size Cemented RECEIVED Production L~ner 0il & Gas Cons. Commission '~~~ ,, True vertical depth 110' 20" 300 sx Permafrost 110' 110' 2606' 13-3/8" 1975 sx Fondu & 2606' 2606' 400 sx Permafrost II 10680' 9-5/8" 500 Sx Class G 10680' 86857' 1590' 7" 550 Sx Class G 11950' 9650' Perforation depth: measured 11019'°11024', 11024'-11029', 11029'-11039' true vertical 8934'-8948.8' (3 intervals) Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, PC tubing to 10409'MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 10321'MD; CamcoTRDP-1A-SSA SSSV @ 2211'MD 13 Attachments: Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation N0vemberl 988 16 If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas__ Suspended__ Service 17 I hereb~y certify that the foregoing is true and correct to the best of my knowledge. , S' g n e d ~,~J,,,~~--/¢-"'~~ Title Operations Engr. Manager Date 7~,/~'~7I CONDITIONS OF APPROVAL: Notify Commission so representative may witness IApproval Plug integrity BOP Test Location clearance Mechanical Integrity Test Subs~e, que~nt/,4~m~, required 10-~ Approved by order of the Commissioner, ~~(.~~Q~//~~mmissio nor Datel//~'~ / -- ' / / SUBMIT iN~RIPL/ICATE Form 10-403 Rev 06/15/88 Approved Oopy ~/' Retu rned/~ ,,~ 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELIN£ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF Gas Cons. Comm'xssion Rnchorage H ! REL ] NE BOP EOU ] PMENT I Drill Site 17-4 ARCO Alaska In. .the Salerochit .e~c__~Pro. Poses to will be ,,- .-,,~no of ~ .... reperf ... . .. ,..._ ,owed for ..,--r'ruOhoe Ba .~r Selective i . a ouO0 "si "'- ~.-~uan-u,., _.. Y Unit U.-- ntervals ....... exPected"sur~/BOP/Lubri~;to~l{ Wirelin; wo~n P..erforating, t~ ace press.-- ~, rested t- - ~ Will be d--- ~ Well ute. u '~.2 times ~k.. une through '"~ maximum The Well is CUrrently SI PrOduce during Perforatin .. River ZOnes :..g_ Opratlons. .r,._d fluids Will be in t · '-:xpected ~t~,,;.. ,_ ,!~ese reperfora,i,,.._ he Wellbor~ -'""~; oOttom hole nre.._"~"u are in the Perforation Interval (Sag River) ~' ~ure: 4100 "s' 8HCS Depth /J I ('MD) Depth 1~0~9-11039 ~'SS) 8864-8880 RECEIVED NOV U 8, 1988 Ahska Oil & Gas Cons. Commission Anchorage F',O, BOX JO0360 ANCHORAGE, ALA,~'K A DATE: 9-30-88 REFERENCE' ARCO CASED HOLE FINALS J-8 9-J0-88 INJEC!ION f-'ROF1LE ?-JO 9-26-88 F'ERF RECORD .~--22 9-2-7-88 AMENDMEN¥ lO ACBL OF 5--J8--82 ~'-22 9-2J-88 PFC ~-t ~--1-88 F'ROI)LJCllON F'ROFILE 3-4 ~-3-88 INJECTION F'ROF ILE 3'"2~ ~-'2- 88 PF(OI)UC ~ ION F'F(OF'iLE S-22 ~'-1-88 PRODUCYION PROFILE J-27 ~-2-88 F'RODUCIION PROF1LE 5-'~ ~'-~-88 PRODUClION PROFILE 5-5 ~'-~-'88 F"F;:OI)UCTION PRL)~ 1LE 6-t4 ~-4-88 F'llg 7- J 3 ~--23-88 COLL. AR/PER~. ~.-~ ~-~-88 I-'KUDOC[ION F'RO~iLE JS-.~ ~-5-88 ~'ROI)UCllON PROF1L. E--POS'I-~ilM, J 5---J ~A ~-2J -88 VER'FIL. OG J 5--J OA 9--2J -88 HAGNELUG iS--J2 ~--J4-88 PRODUCllUN i:'H:UF1LE J 5-.J 5 ~-.~-.88 f'ROQUC1 ION F'ROl.. 1~ E. J 5-J ~ ~.-2~.-88 COMF:'LEI iON RECORD J 5-25 ~ .-.23-88 COLLAR J 6-4 9-2-88 GAMMA RAY J6-..J2 ~--5-88 Pi'(tJUUt'llbN ~"h'U~ ILL t 7-4 9"10-88 F'I F~ t8-t ~'t 1-'88 F"I 1 ~' I'I..EA,S;E SrGN AND I::EII..JRN I'F ~1 II-'-'Y AS RECE.[I.:'IF L)F RECF. i VIE. I) BY ................................. OGT-..ui-IB88 HAVE A NICE DAY! ~.'AL.I.. ~' HC)FF ECKER AFO-J 5,.? Oil & Gas Guns. Cummission , , ^nchomge If RAN,. APPROYED ........... D.[L911< J. L'~ILJ I fUN RUN t , 5" RUN J , 5" RUN J , 5" RUN ~ , 5" RUN t, 5 · RUN J, 5" RIJN J, 5" RUN t , 5" RIJN J, 5" RUN t, 5" RUN t, 5" RUN i, 5' RUN 2, RUN t, 5" NUN t, 5" RUN t , 5" NUN t, 5" RLJN i, 5" RUN RUN i, 5" RIJN t , 5" h:LjH t,., HIJN t, 5" RUN i, 5" DATA, CAMCO $CH ~ ATLA$~ All_A,g.... CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO AIL. A~ CAMCO CAMCO AIl_AS AI'LA~ CAMCO CAMCO $C1~ ATLA~ (]AMC() CAMCO CAMCO ~ CENlRAL FILES .~ CHEVRON l) & M · "',,. EXI'.I:-":N$1ON EXI-'L. ORAI'ION ~: F. XXON MAF,,'ATHON '"' MOB I L. · ,.'" PI. II LL.LI"3' F'B WELl_ F ILIE$ R & I) '"',.SAP[: ~' .S'TArE. OF AL ASKA ~ IEXACO ARCO ALASKA, INC. P.O. BOX ANCHORAGE, ALASKA 995~ DATE: 9-25-88 REFERENCE: ARCO PRESSURE DATA it-t5 ?-J-88 ii-t5 9-7-88 tt-24 8-28-88 ii-25 8-5-88 ti-2? 8-t?-88 t7-4 9-i0-88 BHP--STATIC GRADIENT BHP--$TATIC GRADIENT BHP--£FATIC GRADIENT BHF'--PBU BHF'--F'BU BHF'--$TAFIC GRADIENT F'LEAZE 5'IGN AND F(EYURN [FIE AI'I'ACHE~J COPY AZ RECEIF'I' OF HAVE A NICE DAY! SALLY HOFFECKER AT0-t529 TRANS ~88580 APPROVED DIS[RIBUTION CAMCO CAMCO CAMCO OTIS OTIS CA~CO DA[A~ CENTRAL FILES ~ P ~ F'HILLI S CHEVRON F'B WELL I-ILE$ D&M ~ R&D EXTENSION EXPLORA¥ION ~ ~ SAF'C EXXON ~ ~ STATE OF ALASKA MARATHON ~'~ TEXACO MOBIL WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Class,f,cat,on of Serv,ce Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number ARCO Alaska, Inc. 80-85 3 Address 8 APl Number P. 0. Box 100360, Anchor`age, AK 99510 50- 029-20498 4 Location of well at surface 9 Un,t or Lease Name 2486' FNL, 450' FWL, 5ec.22, T10N, R15E, UM Pr,udhoe Bay Unit At Top Producing Interval 10 Well Number 1753' FNL, 1040' FEL, $ec.28, T10N, R15E, UM 17-4 At Total Depth 11 F~eld and Pool 2176' FNL~ 1351' FEL~ 5ec,28~ T10N~ R15E, UM Prudhoe Bay Field 5 Elevation m feet (mdmate KB, DF, etc ) I 6 Lease Designation and Serial No Prudhoe Bay 0i ] Pool RKB 70' I ADL 28334 12. Date Spudded 13. Date T.D Reached 14 Date Comp, Susp or Aband 115 Water Depth, ~f offshore 116 No of Completions 8/28/80 9/30/80 10/12/80* I N/^ feet MSLI 1 17TotalDepth(MD+TVD) 18 Plug Back Depth (MD+TVD)19 Directional Survey I 20 Depth where SSSV set 121 Thickness of Permafrost l1955'MD/9653'TVD l1910'MD/9618'TVD YES [~] NO [] 2211" feet MD 1900' (approx~ 22 Type Electrm or Other Logs Run D IL/SP/BHCS/GR, FDC/CNL/GR/CAL. GR/CBL. GR/CNL/CCL; Gyro 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 9/~# H-/~O .~,,rf 1113' 32" -~90 Sx AS 13-~/8" 72# L-RO S,,rf ~nR, !7-!/2" !975 s× Fond,_' 9-5/8" /~7# I.-~o/.~nnqR S,,rf ln~Rn, !2-!/4" 800 sx C!ass C ~ ~00 :.' PFC 7" 29# N-80 10.~¢,0' 119~O' R-1/2" RRB ~x ~r.~- 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) Per,for,ated w/4 spf 3-1/2" 10409' 10321 ' 11023 ' -11043 ' MD/8943 ' -8958' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A .... 27 PRODUCTION TEST Date F~rst Production Method of Operation (Flowing, gas I~ft, etc ) N/A Date of Test I Hours Tested PRODUCTION FOR Oi L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD e Flow Tubing Casing Pressure 'cALcULATED.~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE "~ 28 CORE DATA , , Brief description of hthology, porosity, fractures, apparent d~ps and presence of mi, gas or water Sub . * NOTE: Perforated well 5/21/82. Wor'kover, was perfor,med 3/19/88. (Dani) WC5/003 JL!', '" ' Form 10-407 Rev 7-1-80 CONTINUED ON REVERSE SIDE ,.~ .~.... ~ 29 3O GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUE VERT DEPTH GOR, and t~rne of each phase Top Sadl eroch~ t 11,136' 9026' N/A Base Sadl eroch~ t 11,882' 9596' 31 LIST OF ATTACHMENTS None 32 I hereby certify that the foregoing ~s true and correct to the best of my knowledge INSTRUCTIONS General: This form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1 Classification of Serwce Wells Gas ~njectlon, water injection, steam ~nject~on, a~r ~nject~on, salt water d~sposal, water supply for injection, observation, injection for in-sltu combustion. Item 5 Indicate which elevation ~s used as reference (where not otherwlse shown) fordeptk measurements g~ven ~n other spaces on th~s form and ~n any attachments Item 16 and 24 If th~s well ~s completed for separate production from more than one ~nterval (multiple completion), so state in ~tem 16, and ~n ~tem 24 show the producing intervals for only the ~nterval reported ~n ~tem 27. Submit a separate form for each additional ~nterval to be separately produced, showing the data pertinent to such ~nterval Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for th~s well should show the details of any multiple stage cement- in~ and the location of-the cementing tool. ARCO Alaska, Inc. [ Prudhoe Bay Eng~neemng Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager May 3, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-4 Permit No. 80-85 Dear Mr. Chatterton: Attached is the Application for Sundry Approval performed on the above-referenced well. Very truly yours, detailing work to be D. F. Scheve DFS/RAC/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 17-4)W1-3 ARCO Alaska, Inc ~s a Subsidiary of AtlanhcR~chfleldCompany AR3B--6132-C K(', STATE OF ALASKA ALAS . OIL AND GAS CONSERVATION COMI~ 31ON APPLICATION FOR SUNDRY APPROVALS I Type of Request. Abandon - Suspend -- Operahon Shutdown - Re-enter suspended well -- Alter casing - T~me extenmon ~ Change approved program ~ Plugging [] Shmulate )~ Pull tubing ~ Amend order ~ Perforate ~ Other 2. Name of Operator ARCO Alagkm. Inc. 3 Address P.O. Box 100360~ Anchoraget AK 99510 4 Locahon of well at surface 2486' FNL, 450' FWL, Sec. 22, T10N, R15E, UM Attop ofproductive~nterval 1753' FNL, 1040' FEL, Sec. 28, T10N, R15E, UM Ateffective depth At total depth 2176' FNL, 1351' FEL, Sec. 28, T10N, R15E, UM 11 Present well condition summary Total depth' measured 11955 feet true vertical 9654 feet Plugs (measured) 5. Datum elevahon (DF or KB) 7D' RwB 6 Unit or Property name Prudhoe Bay Unit 7. Well number DS 17-4 feet 8 Permit number Rn-R~ 9. APl number 50-- 10 Pool Prudhoe Bay Oil Pool Effechve depth' measured 11019 At top perf true vertical 8934 Casing Length Size Cemented Measured depth True Vertical depth Conductor 110 ' 20" 300 sx Permafrost 110 ' 110' Surface 2606' 13-3/8" 1975 sx Fondu & 2606' 2606' 400 sx Permafrost II Production 10680' 9-5/8" 500 sx Class G 10680' 8685' Liner 1590' 7" 550 sx Class G 11950' 9650' feet feet Junk (measured) Perforation depth measured 11019-11024' 11024-11029' 11029-11039' true vertical 8934-8949.8' ,(3 i.ntervals) .... Tubing (s~ze, graoe an(] measureo oepzn] 3~"= , 9.3#,L-80, PC tubing to 10409' MD Packers and SSSV (type and measured depth) ~ake= SA~ ~ac~e~ ¢ [032~~ ~ Camc~ 12 Attachments Descnpbon summary of proposal 13 Estimated date for commencing operation May 1988 14. If proposal was verbally approved Name of approver Date approved 15, I hereby/~ert,fy~/.e.~..~that.~~the ~true and correct to the best of my knowledge Commission Use Only Cond~hons of approval Notify commission so representative may witness I Approval No. [] Plug integr,ty [] BOP Test [] Locat,on clearanceI -~p.oroved Copy ....... by order of Approved by Commissioner the commission Date Form 10-403 Rev 12-1-85 -- 263-4538 ~ Su~)m,)~(in tr~pl,cate WELLS2/108 R A sen, Drill Site 17-4 Proposed Hydraulic Fracture Treatment ARCO Alaska Inc. proposes the following hydraulic fracture procedure. 1. Replace gas lift valves with dummy valves. 2. Load annulus with fluid. 3. MIRU fracturing service company 4. Pressure annulus to 2500 psig. 5. Pump propped fracture treatment for Sag River zone from 11019' to 11039' using gelled water and Carbolite proppant. a. 200 bbl Pad b. 120 bbl Slurry at 3-14 PPG c. 111 bbl Flush 6. RDMO fracturing service company. 7. MIRU slickline unit and tag fill. 8. If fill is below perfs, MIRU conductor line unit and run temperature log to determine fracture height. 9. Cleanout with CTU if needed. 1 0. Flow well to obtain post frac flowrate. 4 :3 1. 5000 PSI ?" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIR[LINE RAU$ (VARIABLE SIZE) 3. 5000 PS~ 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF 2 H]REL]NE BOP EOUIPMENT 11 I 6 ,5 4 2 1. ~;~000PSI ?" W[LLH[.AD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX C01. LED TUBI. Nt3 UNIT BOP EQUIPMENT REPORT OF SUNDRY WELL OPERATIONS 1 Operations performed: Operation shutdown ~ Stimulate ~. Plugging ~ Perforate ~ Pull tub~ngX~ Alter Casing ~ Other ~ WORKOVER 2. Name of Operator ARCO Alaska. Inc. 3 Address P.O. Box 100360, Anchorage, AK 99510-0360 4 Locahon of well at surface 2486' FNL, 450' FWL, 50c.22, TION, R15E, UN At top of productive ~nterval 1753' FNL, 1040' FEL, 50c.28, TION, R15E, UN At effective depth 2176' FNL, 1351' FEL, Sec.28, TION, E15E, UN At total depth 2176' FNL~ 1351' FEL~ 50c.28~ TION~ E15E~ UM 11. Present well condition summary Total depth: measured 11955'MD true vertical 9653 'TVD Effechve depth: measured 11910 'MD true verhcal 9618 ' TVD Casing Conductor Surface Intermediate Liner Length Size 80 ' 20" 2606' 13-3/8" 10680' 9-5/8" 1590' 7" Perforahon depth' measured 11023' -11043' 12. 13. true vertical 8943'-8958' Tubing (size, grade and measured depth) 3-1/2", L-80, tbg w/tail @ 10409' Packers and SSSV (type and measured depth) 5AB pkr ~ 10321' & TRDP-1A-SSA $SSV (~ 2211' Stimulation or cement squeeze summary N/A feet feet feet feet 5. Datum elevahon (DF or KB) RK~ ?0' 6. Umt or Property name Prudhoe Bay Unit 7 Well number 8 Approval number ~-107 9 APl number 50-- o29-20~9~ 10. Pool Prudhoe Bay 0il Pool Intervals treated (measured) Plugs (measured) None Junk (measured) None Feet Treatment descriphon including volumes used and final pressure N/A Prior to well operation Subsequent to operation 14. Attachments Cemented Measured depth True Vertical depth 390 sx AS II 1lO'MD 110'TVD 1975 sx Fondu & 2606'ND 2606'TVD 400 sx PF II 800 sx Class C & 10680'MD 8678'TVD 300 sx PFC 550 sx Class G 10360'-11950'MD 8493'-9648'TVD Alaska Oil & Gas Cons. C0mmissie~ Cop~es of Logs and Surveys Run [] (Workover Well History) Dmly Report of Well Operations X3 15. I hereby certify that the foregoing ~s true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 ~_~ Title Associ ate Engineer (Dani) SW03/63 Date 4-7-Z~ Submit ~n Duplicate/ Tubing Pressure RECEIVED Representative Dmly Average Production or Infection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure ARCO O!i and Gas Company Daily Well History-Final Report InltrUCllOnl Prepare and submit the "Final Reflert" on the hrst Wednesday after allowable has been assigned or well :a Plugged, Abandoned, or Sold "Final Report" should be submitted al~o when operations ere suspended for an mdeflnde or apprectable length of time On workovers when an official test is not required upon completmn, report completion and representative test data m blocks prowded The "Final Report" form may be used for reporting the entire operation H space ~s avmiable I Accountmg cost center code O~stnct [ eta ARCO Alaska, ThC. ._. F~eld [Well no PRUDHOE BAY FIELD DS 17-4 Auth or W O no AS1975 Operator ARCO Spudded or W O begun ACCEPT Date and depth as of 800 a m 03/19/88 TD: PB:l1910 SUPV:JS/JH I County or Parish NORTH SLOPE - PRUDHOE BAY Lease or Unit ADL: 28334 T~tla WORKOVER API: 50-029-20498 ARCoWI 22.0000 Date 03/07/88 Complete record for each day reported WESTWARD RIG 1 Iotal number of wells (achve or ~nachve) on th~s Dst center prior to plugging and ~ bandonment of thru well I our I Prior status ~f a W O I 0700 RELEASED RIG MW: 8.5 SEAWATER SERVICED RIG. RIH WITH 3-1/2" COMPLETION ASSY WITH TAIL @ 10409', SSSV @ 2211', PKR @ 10321'. LANDED TUBING. TESTED HANGER AND CONTROL LINES TO 5000 PSI. SET BPV. ND BOPE. NU TREE & TESTED TO 5000 PSI. PULLED TEST PLUG. SPOTTED DIESEL CAP IN WELL. DROPPED BALL AND TESTED TUBING TO 3000 PSI AND BACKSIDE TO 2500 PSI. SHEARED SOS WITH 4100 PSI. SET BPV. SECURED WELL AND RELEASED RIG @ 0500 HRS, 3/19/88. DAILY:S258,994 CUM:$716,990 ETD:S716,990 EFC:$613,000 Old TD Released rig Classd~cations (od, gas, etc ) Producing method Potenhal test data New TO Date PB Depth K~nd of ng Type completion (single, dual, etc ) Official reservoir name(s) Well no Date Reservoir Producing Interval Od or gas Test time Production Oil on test Gas aa, Pump s~ze, SPM X length Choke s~ze T P C P Water % GOR Gravity Allowable Eflec corrected The above is correct Date IT~tle For form preparat,op//and-dlstrlbuhon' see Procedures Maifl~al, Sechon 10 Dnlhng, Pages 86 l~d 87 ASSOCIATE ENGINEER AR3B-459-3-C Number ell daily well h~story forms consecutively as they are prepared for each well DIvlM0~ of Atl~ntlc~'~"~4C.~ml~flY ( ARCO Oil and Gas Company Daily Well History--Interim IltStl~cliolte This form ~s used during drllhng or workover operations If testing, coring or perforating show formation name in describing work performed Number all drill stem tests sequentially Attach descnpt,on of all cores Work performed by Producing Section wdl be reported on 'lnilrlm" sheets until final completion Report offlcml or representative test on 'Flail" form 1) Submit "lltteri~t" sheets when filled out but not less frequently than even/30 days, or (2) on Wednesday of the week m which oll Strlrig is set Submit weekly for workovem and following setting of Oll string until completion District Field ARCO Alaska, Inc. PRUDHOE BAY FIELD ICounty or Parish NORTH SLOPE - PRUDHOE BAY Lease or Umt ADL: 28334 State T~R 17-~~ IWell no Date and depth as of 800 am 03/15/88 ( TD: PB:ll910 SUPV:RS/DL 03/16/88 ( TD: PB:11910 SUPV:RS/DL 03/17/88 TD: PB:ll910 SUPV:JS/JH 03/18/88 ( 11 TD: PB:11910 SUPV:JS/JH Complete record for each day while drilling or workover m progress WESTWARD RIG 1 #1. MU FTA #2. TIH. DAILY:S28,546 CUM:$313,769 ETD:S313,769 EFC:$613,000 RIH WITH PACKER MILL MW: 8.5 SEAWATER FINISHED RIH WITH SPEAR. ENGAGED FISH. JARRED TO SET PACKER. POH. RIH WITH BAKER PACKER MILL. MILLED 2'. POH. RIH WITH NEW MILL. DAILY:S28,546 CUM:$342,315 ETD:S342,315 EFC:$613,000 TOH WITH FISH (PKR) MW: 8.5 SEAWATER CONTINUED TIH WITH SHOE. MILLED PACKER 8'. PACKER CAME FREE. CIRCULATED & MIXED 40 BBLS HI-VIS SWEEP. PUMPED SWEEP. TOH WITH SHOE. TIH WITH SPEAR. PUSHED PACKER TO THE TOP OF THE LINER. SPEARED IN. TOH SLOWLY WITH THE FISH. DAILY:S29,089 CUM.$371,404 ETD:S371,404 EFC:$613,000 POOH LDDP MW: 8.5 SEAWATER POOH WITH FISH. LD PACKER, TAILPIPE AND FTA #5. LOAD PIPE. TIH WITH 3-1/2" DP AND 9-5/8" SCRAPPER. CIRCULATE XYLENE TO DISSOLVE ASPHALTENES LET SOAK. REVERSE OUT. POOH LD 3-1/2" DP. DAILY:S54,222 CUM:$425,626 ETD:S425,626 EFC:$613,000 GIH WITH COMPLETION MW: 8.5 SEAWATER SERVICE RIG. POOH LDDP. RU CAMCO. MAKE 4 GR/JB RUNS. RU AND RIH WITH 3-1/2" AB MOD COMPLETION. DAILY:S32,370 CUM:$457,996 ETD:S457,996 EFC:$613,000 AP9 1 ~ ' 2,?,i.e. The above ~s correct S~gnature % button For form preparation and <:~l~tr~ see Procedures Manual Sl~q't~on 10 Dnihng, Pages 86 and IOate IT~tle J-3o ASSOCIATE ENGINEER AR3B-459-2-B Number all dally well history forms consecutively as they are prepared for each well ARCO OIFmld Gal Company Welt Hlltollr- InitlM Report - Dally IlmblmtImie: Prepare and mJbmlt the "hdtlll Re~ml" (m the flint Wednesday ~fler · well la spudded or worKover oporltions ere i~IUle(L Dilly wow W to aeudding Ih(wld he summarized on the form giving inclusive date. only District ARCO Alaska, Inc. Field PRUDHOE BAY FIELD Auth or W 0 no AS1975 ICo~nty parish of borough NORTH SLOPE - PRUDHOE BAY Leale or Unit ADL: 28334 Title WORKOVER DS 17-4 /Vell no API: 50-029-20498 Oporator ARCO Spudded or W 0 begun ID&Se IHour ACCEPT 03/07/88 Date and depth aa of 800 em 03/08/88 ( TD:11955 PB:11910 SUPV:JH 03/09/88 ( TD: PB:11910 SUPV:JH 03/10/88 ( TD: PB:11910 SUPV:RS/DL 03/11/88 ( TD: PB:11910 SUPV:RS/DL 03/12/88 ( TD: PB:l1910 SUPV:RS/DL 03/13/88 ( TD: PB:11910 SUPV:RS/DL 03/14/88 ( TD: PB:ll910 SUPV:RS/DL The above IS correct Signature For form preparation ap/ii d~stnbutlon see Procedures Manu~/Secbon 10, Drllllflg, Pages 86 ano'~e7 0700 fIRS Complete record for each Day reported WESTWARD RIG i IARCO w i 22.0000 Prior status ,f a W O POOH WITH TUBING MW: 8.6 SEAWATER ACCEPT RIG @ 0700 HRS 3/7/88. KILL WELL WITH 8.6 PPG SEAWATER. SET BPV. ND FMC 5-1/2" GEN II TREE. NU AND TEST BOPS. POOH LD 4-1/2" 12.6% TUBING. DAILY:S53,877 CUM:$53,877 ETD:S53,887 EFC:$612,990 GIH PU 3 1/2" DP MW: 8.6 SEAWATER POOH LD 4-1/2" TUBING. TEST RAMS TO 5000 PSI. SET WEAR BUSHING. PU FTA #1. SLIP AND CUT DRILLING LINE. GIH PU 3- 1/2" DP. DAILY:S29,050 CUM:$82,927 ETD:S82,927 EFC:$613,000 TOOH WITH FTA 92 MW: 8.6 SEAWATER TIH WITH FTA #1. BREAK CIRCULATION. TAG FISH @ 10266'. WORK OVERSHOT OVER FISH . ROTATE K-ANCHOR FREE. TOOH WIH FTA 91. LD PBR BARREL AND FTA #1. PU FTA ~2. BREAK CIRCULATION. ENGAGE PACKER. MILL. MONITOR WELL 15 MINUTES. TOOH WITH FTA #2 SLOW -FISH HANGING UP. DAILY:S29,450 CUM:$112,377 ETD:S112,377 EFC:$613,000 CLEANOUT 9-5/8" CASING MW: 8.5 SEAWATER POOH WITH MILLED PACKER. PU HOWCO BRIDGE PLUG. JUNK IN HOLE. POOH. RIH WITH MILL AND CASING SCRAPER TO CLEAN OUT JUNK. DAILY:S43,872 COM:$156,249 ETD:S156,249 EFC:$613,000 MU 7" CLEANOUT BHA MW: 8.5 SEAWATER FINISH RIH WITH 8-1/2" CLEAN OUT ASSEMBLY. POOH. PU 8-1/2" BRIDGE PLUG. RIH AND SET @ 10300'. TEST CASING TO 2500 PSI FOR 30 MIN. OK. HANG OFF DP. ND BOPS AND TUBING SPOOL. CHANGE OUT TUBING SPOOL AND PACKOFF. POOH WITH BRIDGE PLUG. LD 6-1/2" BHA. DAILY:S85,325 CUM:$241,574 ETD:S241,574 EFC:$613,000 TIH WITH PKR AND TAIL PIP MW: 8.5 SEAWATER PU NEW BHA AND DC'S. RIH WITH 3-1/2" DP TO 11365'. CBU. MIX AND PUMP 50 BBL HEC SWEEP AND DISPLACE WELL WITH TREATED SEAWATER. LD 26 JTS OF DP AND POOH STANDING DP IN DERRICK. LD BHA. RIG FLOOR TO RUN PACKER ASSEMBLY. MU BAKER 9-5/8" DB PERM PACKER AND 3-1/2" TAIL PIPE ASSEMBLY. TIH. DAILY:S43,649 CUM:$285,223 ETD:S285,223 EFC:$613,000 TIH WITH FTA ~2 MW: 8.5 SEAWATER TIH WITH PACKER ASSEMBLY TO 9631'. ATTEMPT TO WORK PACKER THROUGH 9631'. POOH WITH 3-1/2" DP AND BAKER RUNNING TOOL. NO PACKER. STRAP AND MU FTA #1/ TIH WITH SPEAR. TAG FISH @ 9635'. SPEAR FISH. WORKED DOWN TO 9646'. TRY TO WORK FREE. fiP~AR R~T.~a~n a~n ~T.n ~nT ~ T~ ~T~_ ~nn~ WT~ ~a l Date [ ~tle ~-,~0-8~ ASSOCIATE ENGI~ AR3B-459-1-D INumberall daily well history forms consecutively no as they are prepared for each well I iPage I 05/0S/87 07:o8 P 1 STATE OF AI,ASKA ALASKA (.)l l, & GAS CONSF',RVA'rlON B,O,P,E, lusFec~ion Report wei _,, D / 7 - Location: Sec,_._' Loe-a~ion, Sen~ral:__~ ._.yell General llousekeeping ~o~.. Rig.. m~d.___S. ,rs ~ Pi~ Gauge Flow Monitor , , Ga~ De~ec~or~ , Visual ,,,, ....... ., .... , . Annular Preven~e~_ ..... _ .... Pipe ~ams .... . .... Blind Rams__ ...... _ Choke Line Valves_.._ .... t{.C.E. Valve .... Kill Line Valves Check Valve Audio ....... Test Pressure -- .......... ,.. , , ... , 11 .~,,- - Test Results: Fallures_,,..::-... . ... Repair o~ ReplacemenC'o~ £ailed equipment ~o be made Co~ission o~ice notified. ACCUMULATOR SYST~I , ' Full Charge Pressur~_~O.~O ...... p$i$ ....... . ...... Pump ~nc~. elos. p~ez. 200 p~g_., Full Cborge Pressur~ Attained:_. N 2....~ ~,gy. 7 4~ . :_8 ~.~ _:..~ = --- Con~rol~: Haster ~/ ,- ........- ' ,---- Remo~e / ~linds switch .... ~ ' ; ...... Uppe~ Ke~l~, ~/ ~esE Fre~sur~ Lower Kc~!y. _~~fcsL Pre~nura~ .~~ Inside BOP__fi/ Test Pressure Cholc¢ lianifold~%est Pressure No. Valves __/~ No. flanges 3~ ....... -- '-,-- Adjustable Chokes__ /_ ,- I!yd r ~.~,c all~e r a t ed choke days ~nd ,, - ~ ~,i o=i~, ~' AO&GCC ' cc '- Opera,or cc - Supervisor TOTRL P, -. , . · · ,, · · , (, STATE OF ALASKA Ji ALA ., OIL AND GAS CONSERVATION CO ,~SION APPLICATION FOR SUNDRY APPROVALS 1 Type of Request: Abandon ~_ Suspend ~1 Operahon Shutdown ~_ Re-enter suspended well m Alter casing r- Time extension ~ Change approved program ~ Plugging ~ Stimulate .~ Pull tubing ~Y~ Amend order ~_ Perforate ._ Other 2. Name of Operator 5. ARCO Alaskaa Inc. R 3. Address 6. P. 0. Box 100360, Anchorage, AK 99510-0360 p 4. Locabon of well at surface 7. 2486' FNL, 450' FWL, Sec.22, TION, R15E, UM 1 At top of productive interval 8. Datum elevation (DF or KB) KB 70' Umt or Property name rudhoe Bay Unit Well number 7-4 Permit number 1753' FNL, 1040' At effective depth 2176' FNL, 1351 ' At total depth 2176' FNL, 1351' FEL, 5ec.28, TION, R15E, UM FEL, 5ec.28, TION, R15E, UM FEL~ Sec.28~ TION~ R15E~ UM 11. Present well cond~hon summary Total depth: measured true vertical 9. APl number 50-- 029-2049~ 10. Pool Prudhoe Bay Oil Pool 11955 ' MD feet 9653 'TVD feet Plugs (measured) None Effechve depth: measured 11 91 0 ' MD true vertical 961 8 ' TVD Casing Length Size Conductor 80 ' 20" Surface 2606 ' 1 3-3/8" I ntermedi ate 1 0680 ' 9- 5/8" Liner 1 590 ' 7" feet feet Junk(measured) None Cemented Measured depth 300 sx Permafrost llO'MD 1975 sx Fondu & 2606'MD 400 sx Permafrost II 500 sx Class G 10680'MD 550 sx Class G 10360'-11950'MD True Vertical depth 110'TVD 2606'TVD 8678'TVD 8493'-9648'TVD Perforation depth: measured 11 023 ' 11 043 ' true vertical 8943 ' -8958, Tubing (s~ze, grade and measured depth) 4-1/2", 12.6#, N-80 @ 10303' Packers and SSSV (type and measured depth) Baker SAB nkr (~ 102R7'_ C. amr, n laRI3p-'~-R=I.c~ ~/ ~ 91~1' 12.Attachments RECEIVED Alaska Oil & Gas Cons. Anchorage Description summary of proposal ~;[ Detailed operations program [] BOP sketch,~ 13. Estimated date for commencing operation March 7, 1988 14 If proposal was verbally approved Name of approver Date approved 15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge Signed 4)/~~ .,~J.z~.JL~' Title A§~Q~;i Qte Engi ne~.r Date Commission Use Only (JC) 5A3/53 Conditions of approval Notify commission so representative may witnessI Approva, [] Plug integrity [] BOP Test [] Locabon clearanceI ORIGIN~[ S~qNED BY Approved by I,,ma~m C. S.~!T,u, Form 10-403 Rev 12-1-85 Apl3,0ved Copy Returned '~-~-~~ Commissioner by order of the commission Date feet Submit ~n triplicate PBU DS 17-4 PRELIMINARY WORKOVER PLAN 1) MIRU WWI. 2) ND tree. NU and test BOPE. Pull BPV. 3) Pull and LD tubing, PBR seal assembly. 4) PU drillpipe. RIH and retrieve PBR and anchor. 5) RIH and burn over packer. Retrieve same. Spot pill if fluid loss is unmanageable. 6) RIH to PBTD. Circulate hole clean. POOH and LD drillpipe. 7) RIH with 3-1/2" tubing, GLMs and packer assembly. 8) Land tubing. Set packer. Test tubing to 3000 psi. Test packer to 3000 psi. Shear PBR. 9) Set BPV. ND BOPE. NU and test tree. Shear pump out sub. 10) Release rig. Anticipated bottomhole pressure: 3860 psi Workover fluid: 8.5 ppg seawater RECEIVED ,F E B 2 ~ !~88 Alaska Oil & Gas Cons. Commission3 Anchorage DCS/5a 2/23/88 ( ANNULAR PREVENTER § PIPE RAHS 5 BLIND RAHS TUBING HEAD ;5 1 13-3/8" CASING HEAD 2 9-5/8" CASING HEAD 3 5000 PSI TIJBING HEAD 4 13-5/8" - 5000 PSI BLIND RAMS 5 13-5/8" - 5000 PSi PIPE PAMS 6 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST I CHECK AND FILL ACCUMULATOP RESERVOIR TO PROPER LEVEL 'WITH HYDRAULIC FLUID 2 ASSURE THAT ACCUMULATOP PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGi,~IG PUMP OFF 4 RECORD ON THE IADC PEPORT THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE BOP STACK TEST 1 FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL 2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT ~N WELLHEAD RUN tN LOCK-DOWN 5CREW5 IN HEAD. 3 CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD 4 TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSl AND HOLD FOR i0 MINUTES BLEED TO ZERO PSI 6 OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE PAMS ~ INCREASE PRESSURE TO 5O.JC, sS: A~D HOLD FOR I0 MINUTES. 8 CLOSE VALVES DIRECTL~ dPSTREAM OF CHOKES BLEED DOWNSTREAr PRESSURE TO ZERO PSi Tq TEST V~L'/ES TESTPEMAINING L,,~TE~ED MANIFOLD VALVES. iF ANY WiTM 5(200 PSI UPSTqEAM OF VALVE AND WITH ZEPO PSI DOWNST~'EAt~ ~,~ ~=~, ~vcT¢~ TO ZERO PSI g OPEN PiPE PAtd$ 5A,? OFF P~JNN~H~ dY AND PULL OUT OF HOLE CLOSE ~LI~D - ' '" AhD ~¢ ~ ~-' ~'~ "* . , ~,~'~ ,~ BLE~ ~ ~r ~c, . ~c, .~,,'::'0 P ~! FOR ~ 0 ~,,,q~c TO ZERO t0 OPEN BLiNDPAMS AND PECOYEP TEST PLUG MAKESUPE MANIFOLD LINES ARE ~ULL OF ARCTIC DIEb~L AND ALL v~vc~ APE SET IN THE DPlLLtNG POSITION t 1 TEST STANDPIPE ~ALVES TO 5000 PSI 12 TEST KELLY COCk S AND ~NSiDE BOP ~0 5000 PSt W',TH KOOMEY PUMP 13 ~ECORD ~'- , , _3T !NFORMATIOt.~ ,?t.; ~uCWOUT PREVENTER TEST FO~M AND SEND TO DRILLING SUPERV~SOP '4, PERFORM COMPLETE BOPF_ ~"-~o~ ONCE A WEEK AND F~JNCT!ONALLY OPERATE BOPE DALLY dG NOVEMBER 21. Post Ofhce Box 360 Anchorage. Ala'.ka~.¢ 99510 Telephone 90(' 7 5637 July 19, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.14-17 5/23/82 D.S.15-5 5/19/82 D.S.17-4 5/23/82 D.S.17-4 5/22/82 D.S.17-4 5/2/382 D.S.18-1 6/21/82 D.S.13-22 6/11/82 D.S.2-22 6/12/82 D.S.2-22 6/13/82 CNL Run 1 5" CNL Run 1 5" EPL Run 1 5" CCL & Perf Record Run 1 5" CCL for Gas Lift }~nd. Run 1 2" Diff Temp Log Run 1 5" ACBL/VDL/GR Run 1 5" Caliper Log Run 1 5" Gamma Ray Collar Log Run 2 5" Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 278 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY STATE OF' ALASKA' ARCO Alaska, Inc.~r[' Post Ofhce btox 360 Anchorage Alaska 99510 Telephone S07 277 5637 June 17, 1982 Mr. C. D. Chat Chatterton Alaska Oil and Gas Conservati on Commi ssi on 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: D.S. 4-11 Permit No. 78-6 D.S. 16-12 Permit No. 81-26 Permit No. 80-85 D.S. 16-4 Permit No. 81-20 Enclosed are our Sundry Notices detailing the work done on the above-mentioned wells. Very truly yours, D. F. Scheve Regional Engineer DFS' TKKW.ml c Enclosures Distribution: Sohio Petroleum Co. Oil & Gas Cons Anchorap'~ STATE OF ALASKA L~. ALASKA (.,_ AND GAS CONSERVATION C v, MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL [] OTHER [] 2 Name of Operator 7 Permit No ARCO Alaska, Inc. 80-85 3 Address 8 APl Number P,O, Box 360 Anchorage, AK 99510 50- 029-20498 4 Location of Well 2486'FNL, 450'FWL, Sec 22, T10N, R15E, UN (surf) 1753'FNL, 1040'FEL, Sec 28, T10N, R15E, UM (top producing interval) 2176'FNL, 1351'FEL, Sec 28, T10N, R15E, UM (TD) 5 Elevat,on ~n feet (,nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No RKB 70' I ADL 28334 12 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number D.S. 17-4 11 F~eld and Pool Prudhoe Bay Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF (Submit m Tr~phcate) (Submit m Duplicate) Perforate [] Alter Casing [] Perforations ~( Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludmg estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) Rigged up slickline unit 5/21/82. Ran 3-1/2" gauge ring. Swabbed well to 1600'+. Rigged down slickline unit. Tested tubing and annulus. Tested tree. Rigged up perforating equipment, wireline BOP, and lubricator. Tested equipment, Perforated 11033-43'MD. Wet gun. Perforated 11023-33'MD with 4spf. Opened well to surge tank. No flow. Perforated 11028-43'MD with 4spf. No flow to surface. Ran Packer Flowmeter-Fluid Analyzer log. Could not detect flow down hole. Rigged down equipment 5-23-82. Secured well and suspended test. JUN 2 Alaska Oil & (]as Cons. Co~;~nliss~o /~,nchora,~e 14 I hereby certify that the foregmng ~s true and correct to the best of my knowledge The space below for Comm~sston use Engineer Date Conditions of Approval, if any By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" ~n Duplmate ARCO Alaska, Inc. Post Ofhce 13o 0 Anchorage, AlasKa 99510 Telephone 907 277 5637 June 17, 1982 Mr. C. D. Chat Chatterton Alaska Oil and Gas Conservati on Commi ssi on 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: D.S. 4-11 Permit No. 78-6 D.S. 16-12 Permit No. 81-26 , D.S. 17-4'~ Permit No. 80-85 D.S. 16-4 Permit No. 81-20 Enclosed are Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve Regional Engineer DFS: TKKW :ml c Enclosures Distribution: Sohio Petroleum Co. t £ £1V D JUN 2 81982 Alaska Oil & Gas Cons. Comm~:~,~, STATE OF ALASKA ~ ALASK/~I ~ AND GAS CONSERVATION C MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Class.f~cat~on of Serwce Well OIL[] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number ARCO Alaska, Inc. 80-85 3 Address 8 APl Number P.O. Box 360 Anchorage, Alaska 99510 50- 029-20498 4 Location of well at surface 9 Unit or Lease Name 2486' FNL, 450' FWL, Sec 22, T10N, R15E, UM Prudhoe Bay At Top Producing Interval 10 Well Number 1753' FNL, 1040' FEI:, Sec 28, T10N, R15E, UM D.S. 17-4 At Total Depth 11 F~eld and Pool 2176' FNL, 1351' FEL, Sec 28, T10N, R15W., UM Prudhoe Bay 5 Elevation m feet (.nd~cate KB, DF, etc ) 6 Lease Designation and SerIal No RKB 70' AFL 28334 12 Date Spudded 13 DateT D Reached 14 Date Comp,Susp or Aband 15 Water Depth, ~f offshore 116 No of Complet,ons 8/28/80 9/30/80 10/12/80 NA feetMSLI single 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 DlrectlonalSurvey i 20 Depth where SSSV set I 21 Thlckness of Permafrost 11955 'MD 11910 'MD YES~ NO []I ~, feet MD 22 Type Electric or Other Logs Run DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94~ H-40 110' 32" 300SX Permafrost to surface 13-3/8" 72~ L-80 2606' 17-1/2' 1975sx Fondu & 400sx Permfr. II 9-5/8" 47# SOO-95 10,680' 12-1/4' 500sx Class G cmt L-80 7" 10360' 11950' 8-1/2" 550sx cmt Class G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD ~nterval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 10319' 10284 ' 11023'-11028'MD 4spf ~'-- ,.~" 11028 '-11033 'MD 8spf 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC 11033 ' -11043 'MD 4spf DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED 8943'-8958' TVD 27 PRODUCTION TEST Date F~rst Production Method of Operation (Flowtng, gas I~ft, etc ) NA Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO TEST PERIOD ~ FIowTubmg CasmgPressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 24-HOUR RATE 28 CORE DATA Brief descr~pt,on of I~thology, porosity, fractures, apparent d~ps and presence of o~l, gas or water Submit core ch~ps Form 10-407 Submit ~n duplicate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 ~ 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all flu,ds recovered and gravity, MEAS. DEPTH TRUEVERT DEPTH GOR, and time of each phase r. Sadlerochit 11,136' 9026' ~. Sadlerochit 11,882' 9596' 31 LIST OF ATTACHMENTS 32 I hereby certify that the foregoing Is true and correct to the best of my knowledge Signed _,,..~,,.~-,_ -_ / T,tleReg. Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on ail types of lands and leases in Alaska. ' Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on th~s form and in any attachments. ~ Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. , · iii Post Office Box 360 Anchorage, Al~aska 99510 Telephone 9( '77 5637 June 9, 1982 Reference: ARCO Pressure Data D.S.17-4 5/23/82 Pressure Survey ase sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 220 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO" GEOLOGY Mm T ON CHEVRON ARCO Alaska. Inc is a subsidiary of AtlanticRichfleldCompany A!ask3 0~1 & Gas Cons. ARCO Alaska, Inc. North SIoF~ strfct Post Ofhce =ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A Rochon D~strlct Operabons Engineer April 30, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: D.S. 17-1 Permit No. 80-55 D.S. 17-2 Permit No. 80-70 D.S. 17-3 Permit No. 80-77 D.S. 17-4 Permit No. 80-85 D.S. 17-5 Permit No. 80-96 D.S. 17-6 Permit No. 80-132 Enclosed are our Sundry Notices detailing the work to be done on the above mentioned wells. Very truly yours, ~ J. ~A. Rochon District Operations Engineer JAR/HFB/kam Enclosures RECEIVED MAY-6 1,981 Alaska 0;1 & Gas Cops. Commission Anchorage ARCO Alaska, Inc Is a subsidiary of AllantlcRichf~eldCompany A(._~ STATE OF ALASKA ~j ALASK .IL AND GAS CONSERVATION C ~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL OTHER [] 2 Name of Operator 7 Permit No ARCO Alaska 80-85 3 Address 8 APl Number ?. O. Sox 360 Anchora§e, AK. 99510 50- 029-20498 4 Location of Well 2486' FNL, 450' FWL Sec. 22, T10N R15E, UM 5 Elevation in feet (~ndlcate KB, DF, etc ) 70' RKB 6 Lease Demgnat~on and Semal No ADL 28334 9 umt or Lease Name Prudhoe Bay Unit 10 Well Number p.S. 17-4 11. F~eld and Pool Prudhoe Bay Field Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF: (Submit m Tnphcate) (Submit m Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repmr Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w,th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) ARCO Alaska proposes to perforate the Sag River Sand for the purpose of flow testing and collecting reservoir fluid samples. After perforating and testing the Sag River Sand, production perforations will be added in the Sadlerochit. The actual perforated intervals will be given on the subsequent report. All wireline operations will be run through a5000psi WP BOP/Lubricator, which will be tested to working pressure. Upon completion of the perforating operation, a SSSV will be installed. Subsequer, t Work Iteporte/t on Form No¢~ Dated MAY - 6 I58t Alaska 0il & Gas Cops. C0mmJssi0r~ Anchorage 14 I hereby ~[~that t~ correct to the best of my knowledge Signed //~, T,tle District Operations Engineer Date Thee spac~e ~ fo__~r Co___m__m_,ss,___on use Cond~t~onsN5f Approval, ~f any Approved opy 4/30/81 Approved by ORIGIH,~I. SIr't'4''" BY LO~,~NIE C. S[~ttTIt Returned By Order of COMMISSIONER the Commmslon Date Form 10-403 Rev 7-1-80 Submit "Intentions" in Tmphcate and "Subsequent Reports" in Duphcate ARCO Od and Gas Company North Ala~ DIstrict Post Off,G_ _,ox 360 Anchorage, Alaska 99.510 Telephone 907 277 5637 Jerry A Rochon Dmtmct Oporahons Engineer December 23, 1980 Reference: ARCO Cased Hole Final_t, D.S. 2-2 10/30/80 D.S. 2-9 11/12/80 D.S. 2-14 11/10/80 D.S. 6Z10 12/15/80 D.S. 6-15 11/22/80 D.S. 14-4 8/23/80 D.S. 14-8 4/22/80 ~"~'~ 17-4 ~ 11/12/80 D.S. 17-4 11/12/80 D.5, 17-4 11/i2/80 ( collar log Run 1 5" collar log Run 1 5" caliper log Run 1 5" continuous flow survey Run 1 audio tracer survey 11 continuous flow survey Run 1 5'~ ,_ continuous flow survey Run 1 5" audio tracer survey Run 1 5" diff temp log/audio survey/static run Run 1 2" '~Please sign and return the attached copy as receipt of data. Mary Kellis North Engineering Transmittal #927 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY SOHIO 1980 MARATHON Alaska 011 8, Gas Cons, C0mmlssiorJ CHEVRON knch0rag~ ARCO O~1 and Gas Company as a D~ws~on o! AtlanhcR~chfmldCompany ARCO Oil and Gas/~" ,mpany North Slope& ,tnct Post Ofhce Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 November 26, 1980 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 17-4 Permit #80-85 DS 5-2 Permit #74-36 DS 2-4 Permit #70-17 DS 17-5 Permit #80-96 DS 1 5-10 Permit #80-88 DS 15-21 Permit #80-91 DS 14-9 Permit #80-89 CONFER: i FILF: ,, , Kuparuk E-7 Permit #80-80 D-6 Permit #79-96 D-7 Permit #79-112 D-5 Permit #79-95 E-4 Permit #80-57 E-8 Permit #80-81 D-3 Permit #79-84 ICO~ COMM COMM _ ! RcS ENG "" i 2 CNG-'-'._J__ , I 4 FNG ~ 1 GFOL I 2 I 3 oEq ,'f I ST^T _J lt)J STAT TEC '-j Dear Sir: Enclosed please find: 1. A completion report, drilling history and a gyroscopic multishot survey for wells; DS 17-4, E-7, D-6, D-7 & E-8. 2. A Sundry Notice of subsequent report for wells; DS 5-2, DS 2-4, D-3, D-5 & E-4. (An updated Completion Report will be filed, for D-3, D-5 & E-4 as soon as produc- tion test data becomes available.) 3. A monthly report of drilling for wells; DS 17-5, DS 15-10, DS 15-21, DS 14-9,.E-8 & D-7. Very truly yours~ , ~, P. A. VanDusen District Drilling Engineer PAV:sp Enclosures ,", Alaska 0,I ,~, ?c Co/)] /440/,Or a~ ARCO Oil and Gas Company ,s a D~wsmn of AtlanlicRIchheldCompany Form 13--7 STATE OF ALASKA (See other in- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* WELLI I DRYO Other b TYPE OF COMPLETION NEW WORK F'-I D~EP- I---I PLUG DIFF WELLr--~ OVER I I EN I I BACKF] RESER r'-] Other 2 NAME OF OPERATOR Atlantic Richfield Company 3 ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Alaska 99510 4 LOCATION OF WELL (Report location clearly and m accordance with any State requirements)* At surface 2486' FNL, 450' FWL, Sec 22 TION R15E UM At top prod ~nterval reported below ' ' ' 1753' FNL, 1040' FEL, Sec 28, T10N, R15E, UN At total depth (projected) 2176' FNL, 1351' FEL, Sec 28, TION, R15E, UM 13 DATE SPUDDED8/28/80 114DATE T D9/30/80REACHED 115 DATE COMP, SUSP, OR ABAND10/12/80 18 TOTAL DEPTH MD&TVD 119 PLUG BACK MD&TVDI20 IF MULTIPLECOMPL, ~;~11955' M~ ¢/~E~IT~TM11910' MDI .OWMANY* single 22 PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* Top Sadl erochi t 11,136' MD 9026' TVD Base Sadlerochit 11,882' MD 9596' TVD 5 APl NUMERICAL CODE 50-029-20498 6 LEASE DESIGNATION AND SERIAL NO ADL 28334 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT, FARM OR LEASE NAME i P rudhoe Bay Unit (' DS 17-4../ 10 ~~OOL, OR WILDCAT Prudhoe Bay Field/Prudhoe SEC.T.R.M,(BOTTOMHOLE 0il Pool OBJECTIVE) Sec 28, TION, R15E, UM 12 PERMIT NO 80-85 21 ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS all 23 WAS DIRECTIONAL SURVEY MADE yes 24 TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, GR/CBL, GR/CNL/CCL 25 CASING SIZE I WEIGHT, LB/FT 20" ! 94# 13-3/8" 72# 9-5/8" 47# 26 i GRADE I DEPTH SET (MD) I HOLE SIZE H-40 I llO'1 32" L-80 I 2606' 17½" S00-95 1 106: RO' 12~" LINER RECORD CASING RECORD (Report all strings set In well) I CEMENTING RECORD / AMOUNT PULLED 300 sx Permafrost to surface 1975 sx Fondu and 400 sx [~ermafrost II 500 sx Class G cmt ~ 27 TUBING RECORD SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 550 -- 4½ 10319 10284 TOP (MD) BOTTOM (MD) SACKS CEMENT* SIZE 10360' 11950' 28 PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) n/a 29 ACID, SHOT, FRACTURE, CEME~NT,,.SQ...UE~E .ZE.,.ET__C- DEPTH INTERVAL (MD) AMOUNT AN~I~ ~1: ~I'~I'L~R[~L USED n/a 3O PRODUCTION DATE FIRST PRODUCTION IPRODUCTION METHOD (Flowing, gas hft, pumping--size and type of pumD) n/a I PRESS 24-HOUR RATE lOlL WATER--BBL GRAVITY-APl (CORR) 31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc ) 1TEST WITNESSED BY I 32 LIST OF ATTACHMENTS Drilling history a~d G)//Coscopic survey 33 ~herebycert~fy~t~f~re~ng~n~ttac~i~$inf~rm]at~nisc~np~eteandc~rrectasdetermmnedfr~ma~ava~ab~erec~rdsTITLE DATE //~. S,aNED~'f4~~/~'~~,,~,. J District Drilling Engineer rr~ *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General' Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska Item: 16: Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements g~ven ~n other spaces on th~s form and ~n any attachments. Items 20, and 22: If this well ~s completed for separate production from more than one ~nterval zone (multiple com- pletion), so state ~n ~tem 20, and in ~tem 22 show the producing ~nterval, or ~ntervals, top(s), bottom(s) and name(s) (~f any) for only the ~nterval reported in ~tem 30. Submit a separate report (page) on th~s form, adequately ident~hed, for each additional ~nterval to be separately produced, showing the additional data pertinent to such ~nterval Item 26: "Sacks Cement" Attached supplemental records for th~s well should show the detmls of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on th~s form for each ~nterval to be separately produced (See ~nstruct~on for items 20 and 22 above) 1ARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35 GEOLOGIC MARKERS NAME MEAS. DEPTH TRUEVERT DEPT )NE Top Sadlerochit ll ,136' 9026' ~ase Sadlerochit 11,882' 9596' CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER NE DRILLING HISTORY DS 17-4 API NO. 50-029-20498 Permit No. 80-85 Spudded well at 1430 hrs, 8/28/80. Drld 17½" hole to 2620'. Ran 13-3/8" 72# L-80 csg and landed at 2606'. Cmtd csg w/1975 sx Fondu + 400 sx Permafrost II to surface. Set packoff, NU BOPE and test same. Clean out 13-3/8" csg and drill 10' new 12¼" hole. Tested formation w/12.5 ppg EMW. Drld and surveyed 12¼" directional hole to 10820' w/no problems. Log w/DIL/SP/BHCS/GR 10801-7000'. Condition tight hole. Ran 9-5/8" 47# L-80/S00-95 csg and landed at 10680'. Cmtd csg w/500 sxs Class G cmt. Set packoff and tstd w/5000 psi. Clean out dsg and drill ~" hole to 10690'. Attempt pressure test formation. Squeeze cmtd 9-5/8" shoe w/300 sxs Class G cmt. Drill out csg and pressure tested formation to 12.5 ppg EMW. Drld 8½" hole to 11955'. Log w/DIL/SP/BHCS/GR and FDC/CNL/ GR/CAL. Ran and cmtd 7" liner w/shoe at 11950', top at 10360'. Cmtd w/550 sx Class G cmt. Clean out liner to 11910' PBTD. Dis- place well w/NaC1 wtr. Artic Pak 13-3/8" x 9-5/8" annulus. Ran GR/CNL/CCL and GR/CBL/CCL logs. Ran 4½" tbg and completion assy w/tailpipe at 10302'. Displace well w/diesel and attempt set pkr. PBR assy sheared and pkr-tailpipe fell 17' down hole. Restring into PBR and set pkr. Tested tbg and annulus, ok. Set BPV. ND BOPE, NU tree and test w/5000 psi. Close tbg sliding sleeve. Rig lines and begin long term tubing test. Rig released at 2400 hrs, 10/12/80. Eastman A PETROLANE COMt~NY REPORT of SUB-SURFACE DIRECTIONAL SURVEY Arco 0il & Gas COMPANY D.S. 17; Well No: WELL NAME Prudhoe Bay, North Slope, Alaska LOCATI ON JOB NUMBER A880D0479 TYPE OF SURVEY Directional Single Shot DATE 9/13/80 SURVEY BY Jerry Cook ' ~'~" OFFICE ....... ,~ "~Alaska ~I:(CO OIL ANI; GAS ~S 17, WELt. NO.* 4 OSS/MHS/DSS :'RUD~IOE BAY, NORTH SLOPE, ALASKA JOB NO~ASOr~0479 COMPUTAI'iON . lIME r~AI'E 1S:51 ;41 22-0CT-80 -F'AGE NO. 1 ...... ]'RUE qEASURED 0RIF'T DRIFT COURSE; VERTICAL VERTICAl. SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG DEF'T~I ANGLE DIRECTr~ON LENGTH DEPI'H SECTION TV[; C 0 0 R D I N A T E S DZSI'ANCE 0IRECTION SEVERIIY FEET D M D F EEl' FEEl' FEE1 FEEl' FEET FEEl' D H DG/iOOF T O. 0 0 0 O. 0.00 0.00 -70.00 0.00 0.00 0.00 0 0 0.00 479. 0 15 S 8 W 479. 479.00 ~ 1.00 409.00 1.0~ S 0.14 W 1.04 S 8 0 W 0.05 907. 0 15 S ~5 W 428. 906.99 2.85 8~6.99 2.75 S 0.82 W 2.87 S 16 ~9 W 0.0~ 1516. 0 45 S 52 E 609. 1515.97 6.95 1445.97 7.52 S 0.11 W 7.52 S 0 51 W 0.1~ 2620. 0 45 S 54 E 1104. 2619.87 10.~8 2549.87 16.21 S 11.4~ E 19.84 S ~5 11 E 0.00 2705· ~ ~0 S 27 E 85. 2704.86 11.11 26~4.86 17.47 S 12.50 E 21.49 S 55 tIE IN POINT FOR SDC HMS 2772. 0 0 0 67. ~.~771.85 11.67 2701.85 18.25 S 12.90 E ~.o~ ~5 S ~5 15 E ..~ 24 2865. 0 ~0 S 29 E 9~. 2864.85 11.92 2794.85 18.61S 13.10 E 22.76 S ~5 ? E 0.54 -9¢U.~ ~- I 0 S ~9 E 9~0 2957.84 12.57 2887.84 19.62 S 1~.78 E 2~.97 S 55 5 E 0.55 5051. 0 45 S 24 E 9~, , ~050.8~ 1~+~9 ? 2980,8~" 20.82 S 14,52 E 25,~8 S ~4 5~ E 0.~6 ~144. 0 45 S 9 E 9~. ~14~.82 14+~2 ~07~.82 21~99 S 14.86 E 26.54 S 54 ~ E 0.21 ~2~7. 0 0 0 93. ~2~6+82 14.84 ~166.82 22.5~ S 14.~6 E 27.09 S ~ ~1 E 0.81 ~50. 0 50 S 11 W 9~. ~29082 15.2~ ~"~59.82~ ~.99 S 14·88 E ~7.~8 S ~2 55 E 0.54 $42~. 0 45 S 24 W 9~· ~422.81 16.24 ~552.81 2~.95 S 14.b8 E 28.04 S $1 19 E 0.~1 ~516. 0 45 S 26 W 9~. ~515.80 17.46 ~445.80 ~' . '2 ~.0~ S 14 06 E 8.7~ S 29 18 E 0.0~ ~6090 0 45 S 26 W ~702~ I 45 S 29 W ~795. 2 0 S 29 W ~888. 4 0 S ~1W ~981. 5 ;0 S ~6 W 9~. ~608.80 18.67 ~5~8.80 26.1~.S 1~.5~ E 29.44 S 27 21 E 0.00 9~. ~701.77 20.69 ~6~1.77 27.95 S 12.59 E ~0.65 S 24 15 E 9S. S794.72 2S.72 S724.72 S0.61 S 11.11 E S2.57 S 19 57 E 9S. S887.59 28.56 S817.59 S4,82 S 8.68 E S5.89 S 14 0 E 2·15 9S. S980.27 S6.1S S910.27 41.24 S 4·4S E 41.48 S 6 8 E 1.67 4074. 6 45 S 21W 4167. 8 0 S 20 W 4260· 10 0 S 20 W 4S5S. 12 0 S 2S W 4446~~ 14 0 S 20 W 9S. 4072.74 45.99 4002.74 49.94 S 0.29 W 49·94 S 0 20 W 2.17 9S. 4164.96 57.91 4094.96 61.12 S 4.47 W 61.':28 S 4 11 W 1.S5 9S 4°~ -' · ~.6 82 /2.4S 4186.82 74.79 S 9·45 W 75.S8 S 7 1~ W 9.1 9S. 4S48.10 90.17 4278.10 91.S0 S 15.95 W 92·68 S 9 5b W 2.24 9~0 44S8.71 111.07 4S68.71 110.76 S 2S.61 W 11S.25 S 12 2 W 2.27 45~9. 1~, ~ S0 S 19 W 46-S2s~ 17 15 S 1S W 4725. 19 45 S 14 W 9S. 4528.65 1S4070 4458.65 1SS.08 S S1.52 W 156.76 S 13 19 W 1.64 9S. 4617.87 160.69 4547.87 158.27 S S8.74 W 162.94 S 1S 45 W '2.61 9S. 4706.06 189.77 46S6.06 186.96 S 45.6S W 192.45 S IS 4~ W 2.71 IRCO OIL AND GAS Jo., 17, WELL NO; 4 DS · ';(UDHOE BAY, NORTH SLOPE, ALASKA JOB NO;ABOD0479 COMPUTATION- TIME DATE 13;51;41 22-0CT-80 'F'AGE NO, 2 TRUE: 4EASURED DRIFT DRIFI' COURSE VE-'RTICAL VERTICAL SUBSEA R E C T A N 6 U L A R C L 0 S U R E DOGLEG DEPTH ANGLE DIRECT£ON LENGTFI DEF'TH SECTION TV[; C 0 0 R D I N A I E S DiS FANCE DIRECTION SEVERI1 FEET D M D FEET FEET FEET FEET FEET FEET D M DG/100F 4818. 21 30 S 14 W 4911, 23 30 S 15 W 5004, 26 0 S 18 W 5097, 28 0 S 12 W 5190. 30 0 S 19 W 5283. 32 30 S 16 W 5376, 35 0 S 19 W 5469. 36 30 S 16 W 5562, ~9 0 S 16 W 5655, 41 30 S 16 W , , , , , 55 225 93 4793 09 222 10 4723 09 218 75 S 53, W ,21 S 13 45 W 1,88 9S. 4879,01 257,27 4809,01 253,20 S 62,46 W 260,79 S 1~ 51W 2,19 93. 4963,46 93, 5046,32 337,68 4976.32 331,29 S 84,44 W 341,88 S 14 18 W 3.65 93, 5127,66 382,33 5057,66 374.70 S 96,48 W 386,9~ S 14 26 W 4.23 ~'~ 16 430,~2 51~7,16 420.71S 110,99 W 435,10 S 14 47 W 93. ~07, 93. 5284,48 481.71 5214,48 469.98 S 126,52 W 486,71 S 15 4 W 93, 5359,95 535,70 5289,95 521,79 S 142.86 W 540,99 S 15 19 W 2,48 93. 5433,48 592,24 5~63048 576,52 S 158.55 W 5~7,92 S 15 23 W 2,69 93, 5504,45 651,84 5434.45 6~4.27 S 1/5,11W 658,00 S 15 26 W 5748. 45 0 S 12 W 5841, 47 30 S 19 W 5934, 50 0 S 16 W 6027, 49 30 S 16 W 6120, 50 0 S 13 W 93, ~o72,18 714,70 5502018 696,08 S 93, 5636,49 781,°0 ~ 5566 49 ' 760,77 93, 5697,80 850,77 5627,80~' 827,44 S 93, 5757,89 921,17~ 5687,89 ~ 895,67 S , ~ ='7 98 964 38 93 5817,98 991,31 ~:.u 47, ._ 190.52 W 721,68 S 15 18 W 208.46 W 788,82 S 15 19 W 229,49 W 858,68 S 15 30 W 249,05 W 929,65 S 15 32 W 266.82 W 1000,61 S 15 28 W 4,78 6.06 3,62 0.54 2,52 6213, 49 0 S 15 W 6306, 50 0 S 16 W 6399, 49 30 S 16 W 6492, 48 45 S 19 W 6585, 49 0 S 15 W 93, 5878,38 1061,10 5808,38 1033,00 S 93. 5938.78 1131,16 5868,78 1101,1~ S 93, 5998,87 1201,57 5928,87 1169,3~ S 93, 6059,73 1271,52 5989,73 1236.43~.S 93, 6120,89" 1341,14 6050,89 1303,40 S 283,93 W 1071,30 S 15 22 W 302,82 W 1142,02 S 15 2~ W 322,39 W 1213,00 S 15 25 W 343,53 W 1285,26 S 15 32 W 364,01 W 1553,28 S 1.5 36 W 1,96 1,35 0,54 2,57 3~ 6678, 49 45 S 16 W 6771, 48 0 S 17 W 6864, 48 30 S 19 W 6957, 49 0 S 19 W 7050, 48 15 S 18 W 93, 6181,44 1411,08 6111,44 1371,42 S 93, 6242,61 1480,64 6172,61 1438,59 S 93. 6304,53 1549.72 6234,53 1504.57 S 93. 6365,85 1619,45 6295,85 1570.68 S 93, 6427,32 1688.99 6357,32 1636,86 S 382.87 W 1423,86 S 15 36 W 402,77 W 1493,91 S 15 38 W 424.21W 1563,23 S 15 45 W 446.97 W 163~.04 S 15 53 W 469,11W 1702,76 S 16 0 W 1.15 2,05 1.69 0.54 1,14 7143, 48 0 S 19 W - 7236¢-'~ 47 30 S 12 W 7329, 47 30 S 11W '7422, 48 0 S 12 W 752'5, 47 30 S 11W 93, 6489,40 1757,99 6419,40 1702.53 S 93, 6551,93 1826,16 6481.93 1768,83 S 93, 6614.76 1893,28 6544,76 1836.02 S 93, 6677.29 1960.67 6607.29 1903,47 S 93. 6739.82 2028.06 6669.82 1970.93 S 491,09 W 1771,94 S 16 5 W 509,47 W 1840,74 S 16 4 W 523,14 W 1909,09 S 15 54 W 536,87 W 1977,74 S 15 45 W 5~0,59 W 2046,~9 S 15 36 W 0.84 5.60 0.79 0.96 0.96 ~RCO OIL AND GAS 'iS 17, WFLL NO: 4 DSS/MMS/DSS · 'RUDHOE BAY, NORTH SLOPE, ALASKA JOB NO;ASOD0479 COMF'UTATION - T I ME [iA T E 13; 51 .' 41 22-0CT-'.80 'PAGE NO, 3 ..... TRUE tEASLJRElq I)RIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG DEPTH ANGLE [ilRECI'ION LENGTH OEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE OIRECTION SEVERII'Y FEET r_; M I) FE'ET FEET FEET FEET FEET FEE F 0 M r~G/iOOF l 7608, 48 0 S 11W 7701. 47 0 S 10 W 7794, 47 0 S 24 W 7887, 48 0 S 21 W 7980. 48 0 S 21 W 8073, 48 0 S 17 W 8166, 48 0 S 17 W 8259, 49 0 S 17 W 8352. 49 0 S 13 W 8445,' 49 30 S 1~ W 6802,35 2095,33 6732,35 2038,51 S 6865,18 2162,19 6795,18 2105,93 S 6~28,61 222~.63 6858,61 2170,81 S 69~1,44 22~8,18 6921,44 2234,15 S 7053,67 2~67,24 6983,67 22~8.67 S 93. 7115,89 2436,15 7045,8~ 2364.01S 93. 7178.12 2504,84 7108,12 2430,10 S 93, 7239,75 2574,08 7169,75 2496,71S 93, 7300,76 2643.52 7230,76 2564,4~ S 93, 7361,47 2713,37 7291o47 2632,18 S 563,73 W 2115.02 S 15 28 W 0,54 576.22 W 2185,34 S 15 18 W 1,34 596,06 W 2251,16 S 15 21 W 11,00 622.30 W 2319,20 S 15 34 W 2.61 647.06 W 2588,01 S 15 43 W 0.00 669,56 W 2457,00 S 15 49 W 689,77 W 2526.09 S 15 51 W 710,13 W 25~5,73 S 15 53 W 728,29 W 2665,90 S 15 51W 747,70 W 2736,32 S 15 51W J"'~O 0.00 1.08 3.25 4.92 8538. 49 30 S 26 W 8631, 50 SO S 18 W 8724. 50 30 S 19 W 8817. 51 0 S 16 W 8~10, 52 0 S 17 W 7421,86 2784,04 7351.,86 2697,48 S 7481.64 ~855,21 7411,64 ~ 276~o48 S 7540.80 2926,72 7470,80 2831,53 S 7599,64 2998,~6 7529,64 2900,21 S 7657,53 3070.6~ 7587,5~ 2969.99 S 774,75 W 2806,53 S 16 i W 801,41 W 2877,34 S 16 ]0 W 824,18 W 2949,04 S 16 14 W 845,84 W 3021,0~ S 16 ~6 W 866,51W 3093,81 S 16 16 W 5.72 6.67 0.83 2.56 1.37 9003. 53 $0 S 16 W 9096, 55 30 S 16 W 9189, 57 0 S 20 W 9282, 57 15 S 22 W 9~75, 57 0 S 23 W 7713.82 3144.14 7643.82 ~040.97 S 7767,83 3219,24 7697,83 3113.7~ S 7819.49 3296.22 7749.49 3187.27 S 7869.97 3374.25 7799.97 3260,18',S 7920.46 ~ 3452.35 7850.46 ~$32.34 S 887.53 W 3167,84 S 16 16 W .. 55 S 16 16 W 908.40 W 3'~43. 932.29 W 3320,82 S 16 18 W 960,28 W 3398,66 S 16 25 W 9~0,17 W 3476,33 S 16 33 W 1.83 2.15 3.92 1.83 9468. 57 30 S 22 W 9561, 57 15 S 17 W 9654, 57 30 S 13 W 9747, 56 0 S 15 W 9840, 56 30 S 16 W 7970,77 3530,55 7900,77 3404.60 S 1020.10 W 3554,14 S 16 41 W 8020,91 3608,69 7950,91 3478,41 S 1046,24 W 3632,35 S 16 44 W 8071.05 3686,19 8001,05 3554,0& S 1066,51 W 3710,63 S J6 42 W 8122,04 3762,94 8052,04 3629,52 S 1085,312 W 3788,~1 S 16 39 W 8173.71 $839.55 8103.71 3704.03 S 1105.99 W 3865,62 S 16 38 W 1.05 4.54 3.63 2.42 1.04 9933. oo 0 S 16 W ~-~- 10026. a~ 0 S 15 W 10051, 54 0 S 14 W 93, 8226,04 5915.80 8156.04 3/77.92 S 1127.17 W 3942,49 S 16 37 W 93, 8279,39 3991,28 8209,39 3851,33 S 1147.53 W 4018,66 S 16 $6 W 25. 8293.90 4011.39 8223.90 3871.04 S 1152.63 W 4038.99 S 16 35 W 1.61 0.88 5.16 I'IE--IN~"F'OINT FROM SDC MMS TO E/W DSS · ~F¢CO OIL AND GAS I~S 17, WELL NO: 4 DSS/MMS/f_~SS r:'RUDHOE BAY, NORTH SLOPE, ALASKA JOB NO:ABOD0479 COMPUTATION ~ ' 'PAGE NOo TIME DAI'E 13:51:41 22-0CT-80 ~ ~ TRUE 'IEASURED 'DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N 6 U L A R C L 0 S U R E DOGLEG DEPTH ANGLE OIRECTION LENGTH DEF'TH SECTION I'VD C 0 0 R D I N A T E S [;ISTANCE DIRECTION SEVERIT1 FEET D H D FEET FEET FEET FEET FEET FEET D f4 DG/iOOF] 10235, 49 30 S 23 W 10260, 48 0 S 24 W 10324, 47 0 S 26 W 10386. 48 0 S 27 W .[0552. 49 15 S 27 W 184, 8407.79 4155.20 8337,79 4007°89 S 1198.42 W 4183,23 S 16 39 W 25, 8424,27 4174,00 8354,27 4025,13 S 1205,91 W 4201,89 S 16 41 W 64. 8467.51 4221,16 8397,51 4067.89 S 1225.85 W 4248,58 S 16 46 W 62. 8509,40 4266.80 8439.40 4108.80 S 1246.25 W 4293,64 S 16 52 W 166, 8619,12 4391,10 8549.12 4219,79 S 1302.80 W 4416,32 S 17 9 W 4.55 2,78 2.00 0,75 10810, 47 45 S 31 W 11061. 39 15 S 40 W 11164, 37 0 S 42 W 11288, 39 30 S 41 W .[1581, 40 15 S 39 W 258, 8790,07 4583,33 8720,07 4388,75 S 1396,46 W 4605.56 S 17 39 W 251, 8971.97 4751,86 8901,97 ~ 4529,14 S -1496,60 W 4770.00 S 18 17 W 103. 9052.99 4812,43 8982,99 4577.12 S 1538.31 W 4828,71 S 18 35 W 124. 9150,36 4885,35 9080,36 46~4.61 S 1589,18 W 4899.50 S 18 56 W 293. 9375.22 5065,24 9305,22 4778,51 S 1709.91 W 5075,2~ S 19 41 W ~o 4.18 2.49 2.08 0,51 -FINAL CLOSURE - DIRECTION~ [~ISI'ANCE; '\ ;;; Eastm. an Wh,ps toc k P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 34~4617 TWX 910-881-5066~Cable: EASTCO October 22, 1980 Arco 0il & Gas P. 0. Box 1479 Anchorage, Alaska 99510 Well Number: D.S. 17, Well No: 4 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Directional Single Shot Date: September 13, 1980 Method of Computation: Radius of Curvature Surveyor: Jerry Cook Job Number: A880D0479 j ATTN: Bob Hines Dear Mr. Hines, I am enclosing the original and one copy of the Directional Single Shot Survey run on the above men- tioned well. We wish to take this opportunity to thank you for calling on our services and trust that we may continue to serve you in the future. Sincerely, ~is :r~i~a~erations Manager cc: file enc. JT/cfw D~rect~onal Dnllers/Sul:~urface Surveyors/Instrument & Tool Rentals/Sales/Worldwide ARCO OIL. AND GAS DS 17, WELL NO; 4 DSS/h~4S/DSS .JOB N[J;A800047¥ PRUDHOE BAY, NORTH SLOPE, ALAS~{A DSS, 0-.2705 MD, DRILL.ER; I~MS, '2772-10051 hD, SURVEY BY SDC, DATE RUN; 13-SEP-80 DSS, 10235-11581 h[~, DRILLER; .J CO01~ VERTICAL SECTION CALCULAI'ED IN F'L. ANE'O~.. F'RO'F'OSAI~ > ~,.~i~~' ,.~ DIRECTION; S 2~,, DEE;° 17 MINo I,,.! RECORD OF' SURVE;Y RADIUS OF CURVAYURE i~'iEI'HOD -- ",/'~' I, .... J ' ~ ' -t------~, ' '!' ~ ~,-e-.. - 'l.i _ ,~---~-I ..... ' ~--~--~" ~ ..... RCO OIL-- GnS .... -t ....... ............. ..... , -- -HORiZON ROJECTi iN'- _:'~ ...... ~RUDH~OE--BRY~-~ORTH :SLOpE~--- RLRS~_~_- [-- -:~.~-:-~'-:. .,:~~~:I~_IC[ I~R: ]:VD :7'--r~ .... ..... ..... ...... ....... .......... __.~ ....................................... ,. ........................... ~.~- -~ ~ ',~~~_~HIP ~ -~-I' i ..... ~_~_~$~ ..... ~ ...... ~ ...... ~ ................ ~-~-.-~-~+~ ~ ~ i ~ I , 1- ~ , ~ , , ~ , , , ....... ~_~ .......... ~_~_~_ . ~ ~ _~_~.~ __;_L. ; ~ ~ I _~_, . ~[_~ ...... ]__.~+ --~--~ ............. ~ .......... ~-~-~--~-t'4-~ '-'- '' ' ..... '! ~'. :.~ ~ ", , ~ ~ ,"i~ , ~ '', ~ i ~ ~ ~' ' ' ~ , .... 'L.-~- ~-~ ....... +-~-~ .... ~-, .............. ~ ........ ~: -~ -.-~ ~ ~ ~. ~ , ~~-~~-~-~--~--~- ........... ~ -~--~ ...... ~--~-= --~--~ ~ .... --- ~ ..... ~ ........ ,-~+-~---~-~ ~ ~ ;-~ ~-L.-~-~-] ~ ~ : ~ i--~-~-~.-~-~ ..... ~ ........ ~ ....... ~-~ ~--~-~ .... ~-~i ..... ~ ..... ~ ......... --~ ....... ~ ~ I ~ ' I -4-~-.-~--~.p-~-~-~ .... ~ ..... k-~-~-~---~-~-~-~--~-~-~ .... ~-~-'=~ ~ ' ' ' ' : - ' ' : ' ' ' ..... ~ , , , ~ ~ ~ ', ~ ; , , , f,'~ . ' ' ~ . _ ', , ,, ~ ~ I [ , I ',,~ ' ---~ ...... , ........ I ~-~--~--,-, ~-~ ....... I ............... ,, __: , ,; : ~--: , , ,~. ~-~ ~ ~ ....... ~~_~.__~_~, ~-~- ......... ~__ ~.-~---~ ......... , . - ~--~ .................. ~ -~-~-~.~--~-.~ ................ ~- ~ .~-=---~,~i~! a ..... ~-~-~-,-.--.. ........ L~--~ ..... ,--~-~ ~- . , ., , , ...... , , , , ,, ~ .,. , ,, ;, ; ; 4,.8_ , n ,, , , , . . , . : , ,,, , , , , , ' , ~ , , , ~ I I ~ ~, I i ~ ~ ~ --: : : · ' ~ ' ~ -'.'"~ ~ : --~. I I i j_ ~-~.._-~--~ ~-~-J', i ! -- ~-~-~--~;--~-.- / .' ~' ' ~ ~~ ~-~. ~-~.~ - ~, ~ ~ ~-~- M~ ~- ~--~-- ,// I t .' l - I i ~ i J i ~ ~ . , ~ , , i :' ', ~ ~ ~ ' ' I I , , I ~ '. i ~ . I ' ~ ~ , . ~ , ~ , ~ ; I ._ '. I , ', !~ I ~.--; ~Ii ~-9-~-~, ; ~F~;-,~-~ .... ~--%--~ ' ' .... '' ' .......... ~ .... ,-..~OMI .... ~ ...... ~-¢ ...... ~ ......... ~-~,--, · . I . ..... ~ ~--~w4--~-~[- - ~-~ ....... ~ ........ t-~ ...... -~r~ .... ~-r ~ -~ ; i T- H-p-~9~--~-?--r-=-~ .... ~_~._~ ....... ~ ..... ~¢ ....... , ~ ~ . , ..... ~ , · ' I ~ ' "'*"'~ ~ : ' · i t : i t . , ! j . , , , ; , , :~,, ~ , . , , , , J ; , : ~ -i t l -.. ~ -~ i~- I -~4: ~-~~ ........ ~ ~ q ? ~;~a~-~= .... ~-;~-~~ ~ : ;-~-~ ~ I i i ~ I ! ~ : '. ~ ! [ ~ i ~ : [ i I ~ ~ I I [ ~ , ~ ~ ~ ~ ' i I. ,, ~ ' t' ~ ~ ~ , ~ ' ~ ', '. ~'~--'- ~- ' : ~ .... . ' , , ', ; ~T~--'~ ' ' ~ ~--~r .... ~ ~ ; ~ ., '-f I ~ ~, ,' r~ ; ~ i · ~ ; i ' ~ ~ I t , I ; ! t , ~ I . · ' , i , ~ , , : , . ~ r ' ~ , I ~ , -- , , , , ' - --~ -~ -r ..... ~~--r--~-- ~-~- --~--~ .... ~- ~--t ......... ~ ....... ~ 1 ....... . -~.~ --k_~ -,-- ,-~ .... ~-~ ..... k ~ ..... 7--~ ..... ~ --I 'I ...... ~ :- ~ , ~ I i ' ~ ' , ~ , ~ . ~ j / ~ · , * ', ~ , ~ i , ~ i I , . I ' ; ' ~ ' ~ ' · ' / ' , ~ , ' ~ , ' I ' ' ~ ' I ~ ' ~ / ~ , / ~ , , j , ' ; ; ~ '" ' ' ~ /' -' ', ' ~} ..... ~ · ' ' , , ' , ' ' , ........ ', , ' . ' ' I ~ ~ , I ' , ' , , i ~ , ~-~-~ ..... ~-~ ..... ~F~ ~ -~ ...... ~ ......... ~ .............. ~ - +~-.-~ ~-~-I- --~.~-~- ~-~ -~- -~ ....... *- ~ -~ ..... t-~-~ -m ' ---~-= ...... ~ ..... ~'~:--:-~-+-t .......... ~ ....... ~ ............ ~ ~, .... ~ ...... ~--~-~ ............. ~-~ ......... ~ + ....... =--~-- ~ ' ' ' ' ~ ' t , , , ' i , , ' ' ' ~ ~ ........ ~., ~ ' .' ~" ~ ' : .... I ' , .~' ' ~ ' ~ ...... ~ '. ~' ~ ~ : ~ ' ' : : ~ ; - ~ ' ~ .... ~. ~ --~-~~-~ ~ ...... ~ .... =~_~.~ ._.~ .... /____~. _; .......... ~_ ~-~ ~ .... ~_~&_~ ._~ ..... ~_~. ~ _ ~ ....... ~ _ ._ , ' ~ I ~~ , I I ~ B , I I I_~ ~ _ ~, ~ , j ~~ , , ~ ~ , , , r ; , , ' ' i ' , _ - ! ; i i ' ; ~ I i '' : '' !~ :ii:1';I''/'''/1 r, ' f/ : I'' ' 'ii! " .... iii ' : ; : i : i~ ' : ' ~' - ~-~ ..... ~--.~--~--~m ...... 4-., ~ ~ ', ..... 4_L-_~ .... ~-~40 --' . 4-~-~ .... :_ '_~ ..... ~_=._~._L_~ ..... L_; .... ~;- '.-i .-~- -~ ~!- ~- ~,=-~--~-~ ......... ---~.~ .... ~ ........ ~ ....... /-:': .... ~-+-I ........ ~ ........ - ...... ~ -~ ........ ~.-. ...... , ........ ,~ - -~-- - ' t , . ' ' ~ ' 'l ' . . _ ~ , ~ . ~ , i ~ : ~ , i . , , . , , , i , , , 4 ~ I ' -.~-~ .... ~ ....... - ....... ; ! -~-I~., ~,~/ ..... ~~-~-~ . !. ~- . , ~. ~ ! ~ , t --~ ,,. .... ~ ....... ~-~~-~--~---,~---k--~78~,-~ ~-~ .......... i ........... ~+~ ........ ~-~ ~ ~ ~ -..--~ .... ~-~-~ ..... ~ ............... ~-~-. ....................... i/~;'- -]- ~ ...... ~- ~ .............. ,-., ............... ,--+- ~---.+ .......... ,-.-~ ........ ?-. ; ' , ~ ~ ' ' , tt' . ~ .... I~ ,, , ' , , ' , , , , ' ~ ~-~--~-~-~ .......... * ~ ~ .......... ~ ~- ,- !~ ~+-~ ...... ~~ .......... ~ -~---~ ..... ~-~--~- 4- ~-~- ~ ~-~-4~ · - ~.- - ~ ~-~-- ~ ~ .......... - ' ' -~-~ ~ ...... ~-: .... 4-; i., ~-.~t-.~ ..... ~ .... ~ ......... ~-.-~--~--;---~;-.~ .... ;--~~-/-~= .... ;--~ ~ . : ' ~ ~ ...... I. I : ....... : , . :. , i , ; ', . , -~ , ~ ..... i ............ : .... -~-F~--~-~ ~-: ................. ~--;-4 ..... = ....... t: .... ~ ........ : ........... ~- --;-~+ -~ ......... =~ ..... :-- : ,-~-~ .......... ~-- . i ~ ' ~ : ~L . : i ~ ~ ~ ~ ~ ~ I : i ~ : , ' , ................................. ~ .... ~ ........ / .... ~- ....... ~ ......... ~ ...... ~ ............................ --,. ' . , ., j~_ 1_ ' ~' ' , ' , , ~ * , , · , . . . ~ , ~ ~ . , . ~ ,. ~ ~ ,, ~ , ~ , ,, ~ .... , ...... , t , ~ ' ' I , ' ', ' , I ' ' ~ ', ; .... ' 4_!__~ .... i_ , ~ ' 4 f , / _ I. ~ , ; ' ~ , -- ...... ! i ~ J ; .... [ '~-% ......... % .... %-,--r- ~ ..... ~ .............................. r F ........ T-i--~- ....... ~ ....... ~ ................. - ........ ~ Z.~; ' ' ' ' ' , ......... ~ .......... r - ~ ~ .................. :__~ ._~ ...... ~._.; . _~__~_~ _+~ ~, ~ , ~ ,- ,,-~,, ~ , . I ,III I~rl II1 I I I I t ri ' ....... ~ ~ ' ~.. ~ ....i . "' , i-~.T~ -~-~'~~ .... , F t-t~= ..... I 't'-i ~ 1 .......... ~ ~ I ' i ~ .~ ~ ,~  ..... ~ J ' ' ' ,i ~ , ' ' ~ ~ - , ......... ~_ ._~._~_~__ ~_..~, ~ .... ~_ ~ ~ , ~.~ , _ ~ ~_ . _ i _ _~ ' , ' J ~ ~ t . · ~ ; r ' -- , ~ ..... , -'-~ '-*-~; .... r~t ...... TT-I ........ - i : -'- r~'T-~' -i'q-"l-~-' ~'~ ISTDSS .5469 Eastman/. ~ Whipstock l A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TiONA L SURVEY Arco 0il & Gas COMPANY 17, ,Well No: 4 WELL NAME Prudhoe Bay, North Slope, Alaska LOCATI ON JOB NUMBER TYPE OF SURVEY DATE i A1080G0079 r~r~ ~,~r,,'~-'' ,',, ' Eastman Whip s t qc c k ( P O. Box 4-19?O/Anchorage, Alaska 99509/(907) 349-4617 TWX 910-881-5066/Cable: EASTCO November 14, 1980 Arco 0il & Gas P.0. Box 1479 Anchorage, Alaska 99510 Well Number: D.S. 17, Well No: 4 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Gyro Multi Shot Date: October 28, 1980 Method of Computation: Radius of Curvature Surveyor: David Pef£erkorn Job Number: A1080G0079 ATTN: Bob Hines Dear Mr. Hines, I am enclosing the original and one copy of the Gyro Multi Shot Survey run on the above mentioned w~ll. We wish to take this opportunity to thank you for calling on our services and trust that we may continue to serve you in the future. Sincerely, Gene Rutland District Surveyor Alaska District cc: file eno. GR/cfw D~rect~onal Dnllers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide OIL ANB GAS ............. 17~ WLI. L NO: 4 GMS JOB NO; AJOSOGO07? 10[' BAY, NOR7~I SLOPE~ ~LDSNA ~ 00- 11800 MD ~ SURVEYOR ~ D. F'gFFERKORN DATE RUN: 28-0CT--80 ~G AZ~ NO~ 11~0, 12 DEG A/U NO~ 78V~ GYRO NO: ~06, 27~ I~A NO~ J186, JOe5 I,:¥]C,]L ':,[Cflt.~N CALCUI_ATED IN F'tANE OF F'ROF'OSAL DIRECTION: S 23 BEG, 17 MINo W RECORD OF SURVEY RAB1US OF CURVATURE METHOD AND GAS , L'L.L NO¢ 4 GMS BAY, NORTH ,:.LLFE, ALASKA ,JOB COMF'UTATION TIME ---'-- DATE ..... 14;50;09 14-NOV-80 F'ADE NO · · TRUE -- _ i~r(IF'T DRIFT COURSE] VERTICAL VERTICAL SUBSEA R E C T A N O U L A R C L 0 S U R E DOGL[ ANALE DIRECTION LENGT;~ BEF'.I'~; SEC]ION TVD C 0 0 R D I N A T E S DISTAUCE B]REC]]ON SEVER] I~ M D F£ET FEET FEET FEET FEET FEET D H I;G/100 0 0 0 O, 0.00 0.00 -70.00 0.00 0.00 0.00 0 0 0.0~' 0 0 0 100. 100,00 0.00 30.00 0.00 0.00 0.00 0 0 0 Jr', S 16 E 100. 200.00 0·17 130.00 0.2J S 0.06 E 0.22 S 16 0 E 0 J~,, S -'"., W 100. SO0.O0 n.~6~ "~30+00 O.~ ..... ,~ S O.J4 W 0.56 S 14 J$ W 0,3c 0 0 0 100. 400.09 0.68 S30·00 0.59 S ~' 0·~5 W 0.69 S 30 30 W 0 15 N 32 E 100· 500.00 0·47 430.00 0·41S 0·23 W 0,47 S 29 49 W () 15 N 50 E J. O0. 600.00 0 05 ~'~ 0 - · ,,o0 O0 0.08 S 0.05 E 0.10 S $1 46 E 0o0~ 0 ~0 S 55 E [00. 699.99 -0.21 629.99 0.05 S 0.66 E 0.66 S 85 15 E 0.5( 0 ~5 S 4 E 100. 799.99 O·J7 779.99_. O.6J S 0·97 E 1.1~, S 58 0 15 S 24 W JO0. 899.99 0·59 829.99 1.03 S 0·90 E 1.~7 S 40 59 0 0 '~0 S 59 E 7,0 S 33 L' -,(~ ,,¢' 70 E 100. 999.99 100· 1099.99 100· JJ99·99 100· J299098 100. 1399.98 0·" 929 ol ·99 0·87 1029.99 1,]8 1129.99 1,40 1229·98 1,57 1329.98 1.23 '~ o 0·81 E 1.47 S S3 J9 ~ 0·°~ 1.46 S J.18 E 1.88 S 39 6 I'; 0.5~' 2.06 S 1.81 E 2.74 S 4J 17 F 0.2. 2,59 S .":'.48 E 3.,,58 S 43 43 [' 0.3, 3.17 S 3.7,9 [_' 4.64 S 46 54 r. 0.3, 0 SO S .'-';9 £' 0 SO S 88 E 0 15 S 32 0 30 S 57 E 0 45 N 46 E 2 0 N 27 E I 45 N 19 E I 0 N SO E 1 0 N 48 E 0 45 N 78 E 0 -1.5 S 73 E I 0 S 62 E J 0 ~ 4~ E 0 45 S 25 E 045 S ]7 E 100. 1499.97 100. [599.97 [00. 1699.96 100. 1799.96 100. J899.96 100. 1999·95 100. 2099·87 100. 2J99.U4 100. 2299.83 100. 2399.82 100. 2499." o 1 ~00. 2599.80 100. 3699.78 J00. 2799.77 100, 2899·76 1,85 1429.97 i · 75 1,~.-9.9'7 I · 82 :16 '29 · 96 2.07 1729o96 _,_, 1 ~.,. , .96 - O. 74 1929. oS -4.02 2029~87 - 6.41 2129.84 -- 8.08 2?.29 · 83 --9 · .24 o-~'~o 82 -9.70 2429.81 -9.73 2529·80- -'9.~0 ~'o 78 '-~·48 . ~729.77 -7·54 2829·76 ;5.84 c.; 4.:'!5 E '::" 73 S 47 5--' L o.''~ 4.09 S ~' 07 E 6o51 S ~'~1 e E 0."' 4,40 S 5.62 E 7.14 S 51 gA E- 0o4f 4.87 S 6,07 E 7.78 S 51 19 E 0.2' 4.77 S -- 7.08 E~ 8.54 S 56 2 E O.Ew~ 2.85 S 8.50 E 8.97 S 7] 29 E' J.3~ 0·16 N 9·78 E 9.78 N 89 2 [:. 0.3, 2.34 N 10.77 E 11.02 N 77 44 E 0.7c 3.69 N 1].87 E 12.45 N 72 42 E 0.3~ 4.38 N J3.21E 13.92 N 71 40 IZ 0.5 4.~2 N :1,4·~'0,~ E 15.13 N 73 24 E O,'~' 3,74 N ]5.91 E-- 16,55 N 76 46 E Z,68 N 17.29 E 17.50 N 81 lJ E O,S 1,42 N 18,J. 4 E 18,20 N 85 31 E 0,3- 0,20 N 18~61 E- 18,61 N 89 2J E 0~1~ l AND GAS WFLI. NOI 4 GMS BAY, NORTti SLOPE, ALASKA D IIR [F"~ ORIFT COURSE-" ANGLE I~IRECTION LENGIH I; M D FISET TRLIE VERTICAL DEPTH F [: F T 0 30 S 34 E 100. 0 ?~0 S .43 E 100, 0 :<0 S 49 E 100. ,-' ,> I.- ] O0. 0 30 S 30 E lo0. 2999.75 S099.75 S199.75 3299.74 ~399.74 3499.74 ~:~.~ ~,,~.73 '379V.69 3899.53 6 0 S 29 W 100. 15 S 24 W 100. 0 '-; 2] Y I00. lt', ':. ,:0 U 100o :499° 14 4098,,47 4197.46 4295~90 439S. ~: ~ JrI 19 0 2] 45 2J~ 45 S ]o W S 14 W S 12 W I00. e 1o W 100. S J4 W 100. 4'190. S9 4586.51 4681 . 61 4775.35 26 15 27 SO 31 ['-- .j 37. 0 J6 0 S [4 W J 00. S 11 W 100. S 13 W 100. S 12 W 100. S 12 W 1 00. 495° ~ 9 5047.38 · .... ] ]~4.5:1 ~'~ '" 2'0 ,..301.60 42 0 4 5 0 47 45 50 0 S 11 114 JO0. S II W 100. E~ 11 W J. OO, S 10 W lO0. S 9 W 100. .,o81.19 5457.50 5599.02 5664.79 JOB NO~ VERT] CAI. SEC'f I ON I"EET -6~I~3 -6.41 --6.10 ~ 78 = 36 -4.78 --4.09 -3.27 --0.66 4.99 13.67 S9.32 56.88 78,47 1-~0.59 J60.99 195.13 233.18 274.88 319.'~8 367.37 419.61 475.15 534.40 597.52 664.77 735.36 808.51 A1080G0079 SUBSEA T V D FE'ET 2929.75 30'29.75 $129.75 3£'29~74 3329.74 3429.74 K529.73 3629.73 37'29.69 3829.53 3929.14 4028,47 4127.46 4~-5.90 4420.39 4 6.51 51 4611.61 4705.35 4797.56 4888.19 4977.38 5064.51 5149.20 523J.60 5311 . 19 "': ~ q-" 50 5460.03 5529.02 -.' ~"~. 79 R E C T A N C 0 0 R P [ FEET 0.78 S J.,46 S 2..07 S ~..59 S '~ :!.7 ..g 3.96 S 4. S 8.1 o.6'7 S 8.11 13o16 S 20.82 S S1.14 S 44.20 S 60~,56 S 81 o 06 c 104.54 8 130.96 S 161.06 '-' 19'5.1~ S '"~3'~ 79 S 273.80 S 317.92 S 365.89 S 417.80 S 473.20 S 532.51 S 595.93 S 663.49 S 734,66 S 808.94 S COMF'UTATION PAGE NO. ~ TIME -' DATE · 14:50~09 14-NOV-80 G L; L A R C L 0 S U R E DOG[ N A T E S DISTANCE DI'RECIlON SFVFRI' FEEl II M DG/J OOF 19.08 E 19.09 'S ~7 40 E 0.3l 19.62 E 19.67 S 85 44 C 0.08 20.25 E 20.35 S 84 10 F 0.05 ~.0.63 E 20.5'0 S c:~ ~,,. 1 E 0.29 20.93 [: "~1.17 n ~ ,~, ....... IS 0.25 21.2~0 E 21.66 S 79 "7 E 0.,,9 21.52 E 22,05 S /7 24 E 0. t0 '1.46 E ~"~.20 o /5 ~ K 0.-~ 20.53 E 22.07 S 68 26 [- 2.01 17,95 E 22~26 S bS 45 E ~,50 18.->~ W 106.'11 "' ~- o . .,~ W 1.25 26.05 W 133.52 S Jl J5 W '2.43 S3.00 W ]64.-11 S 11 35 [4 2.09 40.~'4 W 199.22 S 48.93 W 237.88 S 11 52 W 2 59.16 W 280.ll S 12 12 W 2.50 68.94 W 325.31 S £2 14 W 1.84 79.14 W 374.35 S 12 J'2 W 3.88 90.64 W 427.,.,,_ S 1° 14 W 1.83 102.42 11.J 484.16 S 12 [3 110 3.00 114.49 W 544.68 S 1.2 0 W '2.57 126.81 W 609.27 S 12 1 W 3.5;0 139.95 11¢ 678.09 <~ I.l S= · ~., W 3.00 153.14 W 750.45 S 11 46 114 2.84 165.57 114 825.71 S 11 34 W 2.37 AND GAS -]I.L NO~ 4 GMS ~AY, NORTFI St OPE, ALASKA l~RIf-T DRli-T COIIRSE Af~C.I_[' D]REC1]flN LENG]II IJ M D FEE~ It: 15 S lv W 100. -8 0 S 18 W 100. 7 45 S 1,.. ~ W 1 / J5 S lA W ]00. (.', 0 S ]9 W 100. 8 0 S 2] W 100. 8 0 S 17 W JO0. 9 0 S :19 W JO0. 0 0 S :19 W ~00. 9 15 S 18 W 100. 9 ,30 S :16 W 1000 0 0 S 11,' W 100. o o 8 12 W :1.00. 0 45 S 11 W 100. :' 0 S :1 9 W 100, TRUE VERT]'CAL ]~EF'4 FE[.T 5729.23 L- ..7~'4. J 8 58~9. ] o ,..:,c;c.. I 8 ~,u",53 · J.~-. 6118.73 6184 · 34 6249,94 6315.22 6380.66 ~4~ 08 65]3.34 4~.-'?.44 oo46.03 o712,62 677~.37 ~846,44 6914,00 6981.40 7048.31 7115,22 F~ 7] ~..1 9 72-16.43 7311,21 7376.32 7440.93 750.5,21 7631.41 JOB NO ~ VEPTICAL ,:.EL,] InN FEE ¥ 882 ~ 44 1031. ] 3 11F)': 1181 ~ 68 1 "~: ~' 9'3 J 331 +70 t 406 · 28 ] 400 · ' ~: 0 ~ 1555,42 1630.40 :1.704.89 :1779..,._. ] 854 · 41 1928~85 2003.29 215J,13 2224.18 2297.67 2371.86 2445,95 o ~ -) n S 2 .~_~' * ~ 2596.35 2672.27 2747.70 2823.56 28?9.33 2974.73 A1080G0079 COHF'UTATION F'AGE NO. 3 ' TI~E DATE 14:50:09 14-NOV-OO S U T:o" E A i vo FEET (.~, ....,.I · + ~ 5724. ] 8 ~,o.,3,73 5918,18 ~7C. ~,, 6048 · 7~ 61] 4.34 6179.94 6310.66 6377.08 6443.34 6509.44 6642.62 6709.$7 o776.44 6844.00 6911.40 6978.31 704,. · oo 7111,49 7] 76,43 7241,2] 7306.32 7370.93 74~o,21 7498,98 7561 R E C ] A N G IJ L A R C L 0 S U R E DOGLEG C 0 0 R D ]' N A T E S DISTANCE I~]l<r CllON SEVERIT~ FE[-'T F'E Ii1 D ft DG/I OOf~ 884.56 S J. 76.87 W 902,07 S 11 J8 W 0,,~,~0 959,43 S 190.07 W 978.08 S I1 J2 W 3.08 1033.67 S 206.53 W ]054.]0 S lJ [O I.J 0.91 1108.04 "' ...... ~.70 W 1:130 39 S J 1 "5 W 0.00 11o~-:'-'"'.22 S 242.]9 W ]206.78 S I 1255,67 S 261.87 W :1282.69 S 1] 1328.40 S ,,.~-_°°°.04 W 13'~8.01,.. S ]1 59 W 0.75,. 1401.46 S 300.94 W 1433,40 S J2 7 W 2.26 ]474.84 ,g 3:1° ''-' /,-' ,_.., W 1508.85 S ]o ]1 W O.~'= ]548.3.5 o"' S36.88 W 1584.,_. ~'7 S !..':> ~6 W 0.50 1621.02 S 357.72 W 1660.02 S 12 27 W 3.12 1691.90 S 38:1,44 W 1754.37 S :12 42 W ].06 ]762.72 S 405.82 W 1808.83 5 12 58 I.) ].00 183,¥.67 '3 430.25 W 1883.47 S 13 I' Id 0.75 1903+99 S 455, 15 I,,J 195v,,:,4 ~, 17 /-' ;,I -,-'t, "" . q J3 40 W 0.75 '1974.32 S 4o0.06 W 2031,,L;5 _ 2044,"-' o - . -- 9~ ~' 503 68 W o106,05 S J3 '.,0 W 0.79 °116.04 S 524..., W °180 ]3 S ]3 ~;6 W .24 °1R7.09 S o44.45 W °~53 83 S ]3 59 W 0 8~ 2257. =;-' · ..~ S 566.o6 W 2,7-~-~ 36 S 592 O0 W °401 49 S 14 16 W ] '19 ,,_ ,,~,_ .* . . *,. . ' 2397.61 S 616.27 W 2475,55 S 14 25 W 2,97 2468.84 S 639.41 W 2550.30 S 14 ~] W 1.80 ~.40 73 S A64 ]7 W °626.]] S 1.4 39 W I O0 26]2.98 S 688.34 W 2702.12 S J4 45 W 1.07 2685,.,6 S 7]0.53 W ..777,96 S 14 49 W 1,54 2758.54 S 732,84 W 2854.22 S ]4 53 W 1.61 2832.50 S 752.66 W 2930,79 S 1.4 53 W 4.60 °907.98 S ~¢n 01 W 3007.68 S 14 48 W I 08 2983.37 S 788.22 W 3085,7-I S 14 48 W 6,37 "_'. A Y ~ NORI'H GMS JOB NO: SLOPE, ALASKA I~PJ'FI A N G L L' TRUE I~R]FT COURSE VERTICAL VERTICAL r~IRL-CTION LENGT~I i;EP'~ I I SECTION B FEET F"L:["I' FEET 54 57 0 0 0 1 5 15 S ] 8 L,I ] 00. 7691.58 313] ,56 S 15 W 100. 7748.94 '~°1"'."'" ,o04 S 13 W 100. ~' .]3 3295.].8 S It' {,,I i00, -'~'=-,4.> o . / o.,~ = 3378,06 S 17 W I00. 791~'~51 3461 +48 ,57 57 i- - ,J 7 ,~,5 0 0 0 15 S ].7 W 100. 79c)4.80 3544.96 · ]'~ 6.,: S l~A W 1.00. 8021.26 ' "'8 ,.3 S !8 14 100. 8075.72 371] S 17 W ln0~. . 8130.73 3794.~,7 S 21 W ]00. 8187~01 3877.08 100 8244.19 3959.11 1 00. 8302.79 4040.1 0 100. 8o6=...,4 411v.7] 100. 8477.'''=. ._. -I191.03, 0 0 0 15 ..,° 31 W 100. .... ,-,.'-'=o6. '-'3. 4339 .1"'~. S ;.'42 W ]00. 8651.]8 4414.,,'~, S 3] W 1000 ,~oo 5 8 ,~ o,.., ...,. = 7 44 7, ,18 S S7 W 100. RYoo.,..O 4557.68 S 37 W 100. 884] .48 4624.08 ~ 7 45 ~7 45 ,0 45 2 45 ] 15 S ~0 W 100. 8o18.63 4685.44 S 40 W JO0. 8997.70 4744.07 S 39 W 100 90?5 13 4804 ~- S 39 W 100. 9]-19.73 4868.91 S S2 W ~00. 9224.04 4934.27 0 30 0 0 7 0 8 0 S 37 W 100. 9299.65 4998.44 S 36 W 100. 9375.98 5061.34 5 37 W 100. 9453,14 5123,26 S 35 W 100. 953].40 5183.98 lO TD A1080G0079 COMPUTATION f'AGF t,{O. 4' TIME DATE 14~50:09 14-NOV-80 SUBSEA FEET 7621 .=-Ooo 7678.94 7734. ]. 3 7788.42 -]0 ;~ .> .il 7896.80 7(/'51.26 8005.72 oOc, O. 7~, 8117.01. 8J 74.19 Ro-~o 79 °° $:'N ..,4 8363.2.5 0451. ~ 2 8496.23 o,~] ~ ~ ]8 '~a.>8.57 869'8.50 07, ~ · 48 8848.63 8927.70 9005.13 9079.73 9154.04 9229.65 9305.98 9383.14 9461.40 R E C T A N G ii L A R C 0 0 R 0 t N A T E S FEET C I_ 0 S U R E DOGLEG DISTANCE I~]I'<[.CTION SEVERiT, FL E1 D M DG ," 100F' 3059.11 S '"' o13.56 W 3z=._.44 3:{37.64._.c' 836.''''-~o~. W 3'>47.31 321. 8.54 S o....)'"'~',, o9, i,d 3330.6:3 3300.03 S 877.3] W 34J4.65 3380.87 8 900.49 W $490.74 3461.J8 S 925.04 W 3582.66 3541.59 S 948.86 W 3666.50 3621.79 S 973.38 W 3750.31 3701.43 S 998.49 W 3833.74 3779.57 S ~025.40 W 39J6020 3nc'-~ 36 S J056 79 W 3997 58 3928,79 S 1091.03 W 4077.47 3997 8'> S 11 .97 W 4].53.63 406'~.78~. S 1161.51 W 4225° ~1..~6 · Ac) ._el ] ] 97.65. bi 4 ._ .,., .,o. c,~,. 439J .3°,_, "'> 1°37. .30W 4370. I'~, 4256.21 S 12:77.03 W 4443.66 4319.]9 S 1315.63 W 4515.]2 4378,42 S 1355.58 W 4383o47 4433.00 S 1396.71 W 4647 4482.77 S 1436.~0 W 4707.25 4529.67 S 1.475.65 W 4763.97 4578 4R S l= ] 5 _ o ..09 W 48~.> 9] 4630.23 S [=~7.79 ~., W 4885.°' 46U4~67 S ]596.62 W 4949°28 4738.b8 S J633.68 W 5012.29 4790.52 S 1672.11W 5073.96 4841.65 S 1709.94 W 5134.75 4892.01S 1746.53 W 5194.43 "2° J5 3.17 ],94 J .70 I .68 0.2b 0,84 3.45 S 15 20 W S 15 3J W S I 5 45 tO 5 15 '-'_,/ S lc., JJ 2.47 .~.. ~_. -~ + C.',.1 '~.° .57 S LA 27 W S 16 42 W S ]6 56 W S 1.7 12 tO ..9 W S 17 .>' 1 .46 1.26 2.85 S 17 46 W S ]8 3 W S J8 19 W S ]8 36 W S ! 8 49 W 3.99 0.00 3.07 2.00 4.92 S 19 J W S 19 14 W S L9 Z7 W S 19 59 W 3.36 0.82 1.19 1.60 _ ANO GAS .JE'LL NO~ 4 Gt'iS BAY, NORT~I SLOPE, ALASKA JOD NO; AlOSOGO079 COMPUTATION I-"A G E NO. ~. TiME - DATE '. J 4150109 14-NOV-80 TRUE - I;RIFT DRIF-T COLIR~E L.~ERTICAL VERTICAl_ SUDSEA R E C T A N G U L A R C L 0 S LI R E DOGLEG ANGI [7 DIRECTION LENGTH . DE-F'IH SECIlON lrVD C 0 0 R D I N A T I_' S DISTANCE DIRECTION SFVERIT, D ~ D FEET FEET I'E['l' FEET FEET FEFT D ~ DG/1OOFt ,78 0 S 35 W 10~, 9610,99 5244,87 9540,99 494°,95.. S 1~8°, .,PO W 5254, ,.J2 S 19 50 W 0,,~0.. A~I~ 11955 MD ARK_ F'ROJ[[CTFD SURVEY STATION. S >o 0 S 35 W 38 0 S 35 W 9, o610,08, 5"50,.°9..:_ ._ 0548.08 4947,49 5; 1/o,.,38, W 5259.77 S 19 51. u 4='o . g'65,7(. . ,., ,04 ~',277. "t:P_ , . o~--.o=, ,.,,.....,, 54 45'70,18 S J. 801 ~27 W 5")86,5°... ._ S 1o. 55 W 0 · O0 i. ['10SLJRE -- DIRECTIONI DIS1ANCE I S ~9 DF. GS 55 HINS W ~'~ 286., .,... F'F ET i-1RCO OIL FIND GAS I,~ ~--] ''DS 17, .WELL NO: 4 GIXS ' i , '-- - FRUDHOE B~Y, N~RTH SLOPE, RLRSKFI , T------- ............... EASTMAN NHIFSTOCK. INC. SURFACE LOCATION: 2486 FT SOUTH! 450 FT ERST S~CT~ON, ~ ' T 1 ON', R 1SE,:UH_- _.'--~ ........._'-J ..... --~ .... ] -'--i-, ' HOR I ZONTF]E-- P, ROJECTTON--- SCFILE 'l IN. ',= 500 FEET _ DERTH__I ND I CRTOR:_ IVD. 1 1 t . - _ 8918) ) I ~/~ DEPTH I1955 HD. 9553.54 TVD ' 9518(~'.~ SOUTH 4970.18 NEST 1801.25 -i---CLOSURE 5288o5t-S 19 55-17--N I --- I --~ ~'%RCO O]'L AigD GAS .................................................... IJC~ LT, WELL NO: 4 GMS JOB NO: AlOOOGO079 I"RLI[IIIOE BAY, NORTH SLOPE~ ~[.ASNA ,/,,c, 100-11000 HD, SURVEYOR: D F'EFFERI%ORN [I~TE RUN: 28--0CT-80 ~0, I~r.G A/U NO: 1110, ]?~ IiEG ~/U NO: 7o9',~ , GYRO NO: ~0~, 271 CAf,II'_F<A NO: 1186, 10~5 RECuRi.~ OF' ]NT[]RF'OI_A]ED SURVEY' I)S 17, WFL! NO: 4 GMS '- F'RUI~IIO[ BAY~ NORIH SLOPE, AI_ASKA .................. .JOB NO; A1080GO079 ................ TRUE SLiBSE'A M _FF]SUI..'I' I~ VI .l(l I'CAL MII-TVD VFR ¥ICAI. I'~£ f' T II DEF'I FI I; IFF DEF'TI-I FLF- 'r FEE'T FEE 1' FE'E'T i J ! '~.4. O0 90°5,57 al] O. 4 89.....J. _ 7 [ I O0''~. , O0 9596,02 .....~-~o z.,.,,.,, 0 9526,02 R E C 1' A N G I; L_ A C 0 0 I',: I) I N A T E S FEET 4547.24 S 1490.]4 W 4933,37 S J775o49 W TIHE ...... DATE 14:48~27 14-NOV-80 C L 0 S U R E DISTANCE DIR[CT]ON F E- E T fi ~I 4785,18 S 18 9 W 5243.]3 S 19 48 W VE-RT TCAI_ TI-I;] CIxNES Check Form for timely compliance w~th our regulations. Operator, Wel 1 Name and Number Reports and Materials to be received by: //-- / Date Completion Report Well History Samples Mud Log Required Yes Yes Date Received Core Chips Core Description Registered Survey Plat Inclination Survey Directional Survey Drill Stem Test Reports Production Test Reports Logs Run Digitized Log Data Remarks Yes CURVE DATA LOCATED IN THE APPENDIX December 1, 1980 Mr. P. A. Van Dusen District Drilling Engineer Arco 0il and Gas Comapny P.O. Box 360 Anchorage, Alaska 99510 Re .. P.B.U. DS 2-1T . ca 3 Kuparuk ~, Kuparuk D-7 Kuparuk E-7 Kuparuk E-8 , We have checked our files and do not find Completion Reports (form 10-407) on the subject wells, l{e understand the report on P.B.U. DS 2-17 was waiting for a final directional survey to be received. Available information indicates the other wells have been drilled and were completed as unperforated oil wells during October, 1980. Please check your transmittals to confirm that the forms have been sent. If they have not, send the appropriate 10-407 forms at this time. Please let us know if it is necessary to delay the final reports until receipt of directional surveys on any of the welIs. Sincerely, , John A. Levorsen Petroleum Geologist JAL: mm ARCO Oil and Ga~ '~mpany North Alas~ .Jmstrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon Dmstnct Operations Engineer November 20, 1980 Reference: ARCO Directional Surveys D.S. 17-b, 10/28/80 Multi-Shot I CONFER: ,'FILF: ~Pl~ase sign and return the attached copy as receipt of data. Mary Kellis North Engineering Transmittal #830 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON RECEIVED NOV ?. 5 1980 Alaska 0Il 8, I)mm Cons. Commission Anchorage ARCO Otl and Gas Company is a Divms,on of AllanhcR,chheldComp,~ny ARCO Oil and Gal~ Company Norlh Ala~. D~stnct Post Office Box 360 Anchorage, Alaska ej9510 Telephone 907 277 5637 Jerry A. Rochon District Operahons Engineer November 19, 1980 Reference: ARCO Magnetic Tapes D.S. 3-6 1 ENG I 2- E~NG 3 6NG ~ O~OL-- 3 GEOL / STAT TEC -- STAT TEC [CO~FER: FILF: 11/3/80 Tape #File 1 NLLG (Pass t-3)File 2 (Pass 4-5) 9250-9950 D.S. 4-14 11/11/80 TapE#/ON/MS 8600-9290 D.S. 7-14 11/2/80 Tape# CNL/MSN 10000-10980 p.s. 14-5 lO/3O/8O 10/29/80 Tape# C/O 8680-9350 Tape# CN/~L$ 10200-11900 ~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #827 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GE TTY SOHIO ~THON CHEV~0N ARCO Od and Gas Company ~s a O~ws~on of AtlanhcR,chf~eldCompany ARCO Od and Gas Company Norih Alas~ istrict Post Ofhce ,.,ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon D~stnct Operations Engineer October 31, 1980 Reference: ARCO Cased Hole Finals D.S. 2-17 9/9/80 CNL Run 1 0/6/80 CBL Run 1 D.S. 2-17 9/9/80 Collar Log Run 1 D.S. 5-6 10/14/80 Spinner Run 2 D.S. 14-2 9/27/80 CNL Run 2 ti 2" & 5" 5" - _ I 4 '~---I 1 GEOL __1_.3 GEOt. ' __l _STAT TE~-- J STAT :I'EC-- j- CONFER: rll F: D.S. 17-4 10/6/80 CNL Run 1 5" e sign and return the attached copy as receipt of data Mary F. Kellis North Engineering TRANSMITTAL #769 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALAS~ CHEVRON E r ov 6 -1 a9 Alaska 0il & gas Cons. Commission Anchorage ARCO Od and Gas Company is a D~wslon of Allanl~cRichl~eldCompany ARCO Oil and Gas Company North Alas~ ~istr~ct Post Office ',.,ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon Distrtct Operations Engineer October 21, 1980 Reference: ARCO Magnetic Tapes D.S. 17-4 Tape #61032 Run 2 9/30/80 ~~Please sign and returnthe attached copy as receipt of data. Mary Kellis North Engineering TRANAMITTAL #735 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO OH and Gas Company ~s a Oivls~on of AtlanhcRichf~eldCompany ARCO Oil and Gas Company North Alas( ]mtrlct Post Ofhce"_ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon Distr~ct Operations Engineer October 14, 1980 Reference: ARCO Open Hole Finals lO/2/8o FI~C p.s. 11-1~ ~_nl 5[ D.S. 11-14 10/2/80//~~~~un I & 2(same log) 2" & 5" D.~~ 10/~80 Cyberlook R~ 1 5" D.S. 17-4 9/30/80 FDC R~ 1 D.S. 17-4 9/30/80 FDC/CNL D.S. 17-4 D.S 17-4 .S 17-4 9/30/80 DIL/L 9/30/80 BHCS 9/30/80 RFT 11 Runl Run 1 & 2(same log) 2" & 5" Run 1 & 2(same log) 2" & 5" Run 1 5" Please sign and return the attached copy as receipt of data. Mary Kellis North Engineering TRANSMITTAL #696 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON SOHIO ~THON ARCO OH and Gas Company ;s a O,v;s~on of Atl3nt~cR~chf~eldCompany ARCO Oil and G( mpany Alaska f3~t~cl Po~t Othce Bo;..,~a Anchorarje Alasi. a' .,.~,l~l Telephone 90[ 2~; ,~J, October 7, 1980 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' Kuparuk D-6 (Permit No. 79-96) Kuparuk E-7 (Permit No. 80-80) (Permit No. 80-73) (Permit No. 80-85) Dear Sir' Enclosed please find our Monthly Reports of Drilling Operations for the subject wells. Very truly yours, P. A. VanDusen District Drilling Engineer PAV'sp Enclosures Form No P-4 REV 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20498 6. LEASE DESIGNATION AND SERIAL NO. ADL 28334 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Atlantic Richfield Company Prudhoe Bay unit 3. ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL 2486' FNL, 450' FWL, Sec 22, TION, R15E, UM 9. WELL NO. DS 17-4 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay .Field/ Prudhoe Oil 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec 28, TION, R15E, UM 12. PERMIT NO. 80-85 Po( 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Report of Operations for September, 1980. As of 8/31/80, drlg 12¼" hole below 2630'. Drill 12¼" directional hole to 10820'. Log w/DIL/SP/,BHCS/GR 10801'-7000'. Condition tight hole and raise mud weight. Ran 9-5/8' csg and land w/shoe @ 10680'. Cmtd csg w/500 sx Class G cmt. Set and tstd 9-5/8" packoff w/5000 psi, ok. Drld out csg w/~" bit, wash and ream to 10690'. Attempt perform leak off test and establish circulation in 9-5/8" x 13-3/8" annulus. Set 9-5/8" cmt retainer and squeeze cmtd 9-5/8" shoe w/300 sx Class G cmt. WOC, drilled up retainer and clean out 9-5/8" csg. Tstd formation to 12.5 ppg EMW. Drill and survey 8½" directional hole to 11955'. As of 9/30/80, prepare to run OH logs. 14. SiGNED! heteby~th/· ~ ~' ~n'g-'s c~o~ec~t TiTLEDistrict Drilling Eng. DATE 0~'/'0~/~ ~ /q~O NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. # ARCO Oil and Ga~ mpany Alaska D~stnct Post Ofhce Box 360 Anchorage Alaska 99510 Telephone 907 277 5637 September 25, 1980 Hoyl e Hamil ton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject- Drill Site 17-4 Dear Sir- We appreciate the effort your group put forth in obtaining the exception required for the original DS 17-4 plan. Unfortunately, economic reasons require us to complete the well in the standard manner. Attached is a Sundry Notice outlining the completion plan now proposed for DS 17-4. If there are any further questions, please contact me at 263-4270. Very truly yours, P. A. VanDusen District Drilling Engineer PVD;SP Attachments ARCO 0;1 and Gas Comga~a¥ is: ?,~w~,c,q c,f AHanl~cR,cn;i~IdCoror~a~,v Form 1'0~403 REV. 1-10-73 Submit "1 ntentlons" In Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS OI~,V~!~L.S. (Do not use this form for proposals to drill or to Use "APPLICATION FOR PERMIT---~' for such O,L I--XI GAS'I'--! WELLt I WELL I--J OTHER 2. NAME OF OPERATOR Atlantic Richfield Company tl~.~ 3. ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL Atsu.ace 2486'S & 450'E of NW cr Sec 22. T10N. R15E. UPl BHL' 1320'S & 1320'W of NE cr Sec 28. T10N. R15E. UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) Pad Level - 30' RKB 70' 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20498 6. LEASE DESIGNATION AND SERIAL NO. APL 28334 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 17-4 (xx-28-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field/Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 28, TION, R15E, UM 12. PERMIT NO. 80-85 )orr, or Other Data NOTICE OF INTENTION TO; TEST WATER SHUT-OFF L- PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR AClDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTER lNG CAS lNG SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE~ Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield Company applied for and received an exception to Conservation Order No. 145 Rule 3(f), for DS 17-4, permit No. 80-85. For economic reasons, Atlantic Richfield now proposes to comply with C.O. No. 145 and complete the well in the following manner. The drilling and casing of the surface hole was the same as originally permitted. A 12¼" hole was drilled to 10820' and a string of 9-5/8", 47# L-80 & S00-95 casing was run to 10680'. It was cemented with 500sx of Class "G" cement. An 8½" hole will be drilled to 11818' and open hole logs will be run up to the 9-5/8" shoe. A 7" 29# L-80 liner will be set and cemented with + 175sx Class "G" cement. A string of 5½", 17# L-80 tubing, packer, and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing liquid will be left in all uncemented annuli within the permafrost interval. Selected intervals within the Sadlerochit interval will be perforated and reported on subsequent report. 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. Well will be flowed to prod~L~tion facilities during perforating and testing. The downhole safety valve will be instaTled and tested upon conclusion of job. Subsequent Work Reported on Form No ------- Dated -..].-.ff...~ 16. I hereby certifY that t~~correct __ (This space for State ) ~~ Copy Returned ~ Imtructions On Reve~ Side //~///~ ARCO 011 and Gast -~mpany I -t I September 24, 1980 Mr. Hoyle Hamilton State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject- As-Built Survey Plats Dear Sir' P~ B~ t7-8 In an effort to insure that your files are complete, we have attached copies of our well location as-built survey plats for all wells permitted thus far in 1980, excluding those included in our original drilling permit applications. Very truly yours, P. A. VanDusen District Drilling Engineer PAV/JBK/jh Attachments 16 1 T Io¢, gl~¢, d.M- '~ I I HEREBY CERTIFY THAT I AH PROPERLY REClSTEREb ANB LICENSEB TO PRAOTICE LAND SURVEYIN6 THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS AN AS- D.S. ~7 - 60~DUCTORS ~ THRU 6 BUILT SURVEY ~ADE BY HE, AND THAT ALL B I~ENSIONS AND OTHER AS-BUILT LOCATIONS DETAILS ARE CORRECT, AS OF: STATE PLANE LAT S LON6 1. Y = 5927794.394 4. Y = 5928144.192 X = 708786.754 X = 708702. 546 LAT = 70°12'21.846'' LAT = 70°12'25.308'' ~~ LONG = 148°18'59.678'' LONG = 148°19'01.841'' ~.- ~ '..~ 2. Y = 5927910. ~6 S. Y = 5928~6o.936 ~*~49~~ LAT = 70°'2'22.~5'' LAT = 70°]2'26.~6~'' LONG = 148o19'00. 94" LONG = 148°19'02.574'' 3. Y = 5928027.297 6. Y = 5928376.895 X = 708730.871 X = 708645.462 LAT = 70o12'24.]5]" LAT = 70°12' 27.6~1~ LONG = 148°19'01.113" LONG = 148°19'03.331'' II L III I I~ IIlI [ ii illin i iii iii iii II II1~1 II I I I oUcTo~ TH~U & O.~.-17, coM ~ I ~-~Ui~T ~O~TIO ~ ,,,, ,,,,,,-~ , ............. ~ ...... lanticRichfieldCompany DATE: DRAWING NORTH AMERICAN PRODUCING DIVISION A.,..~ ALASKA DISTRICT- PRUDHOE BAY II i ii I I III I I iii i i ill ...................... I1~11 '1 ARCO Oil and Ga~ ~ ompany Alaska O=s[ , Post Ofhce Box ?,60 Anchorage. Alaska 99510 Telephone 907 2/'7 5637 September 9, 1980 Mr. Hoyl e Hamil ton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 cl --J 3 GEOL ' I J STAT T~C _~[STA_ T_T_EE t j_FILF'~ ........ Subject: DS___l_l~4 ' (Permit no. 80-73) ~~7-4~ (Permit no. 80-85) ~ Kuparuk U-2 (Permit no. 79-111) Kuparuk E-6 (Permit no. 80-78) Dear Sir' Enclosed please find our Monthly Reports of Drilling Operations for the subject wells. Very truly yours, P. A. VanDusen District Drilling Engineer PAV/sp Enclosures ARCO OH and Gas Company ,~ m D v~SIO=~ of A ian'lcR,chtieldCo~';~pany Fpnn No 10404 REV. 3-1-70 ( ~ SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS I OIL ~] GAS ~] OTHER WELL WELL 2. NAME OF OPERATOR Atlantic Richfield Co. 3 ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL 2486' FNL, 450' FWL, Sec. 22, TION, R15E, U.M. 5. AP! NUMERICAL CODE 50-029-20498 6. LEASE DESIGNATION AND SERIAL NO ADL 28334 7 IF INDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO DS17-4 -~. FIELD AND POOL, OR WILDCAT P-ff~7~6-B'ay Field Prudhoe Oil Pool 11 SEC. T R M. (BOTTOM HOLE OBJECTIVE) Sec. 28, TION, R15E, U.M. 12. PERMIT NO. 80-85 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Report of Operations for August, 1980 Spudded well @ 1430 hours, 8/28/80_. Drld 17½" hole to 2620'. Ran 13 3/8" 72# csg and la~-a-e~-a't 2-605'. Cmtd csg w/2225 sx. Fondu cmt followed by 400 sx. Permafrost II cmt. Install 13 3/8" packoff and test w/2OOOpsi. NU 13 5/8~' BOP stack and test same. Drld out, 13 3/8" csg w/12¼" bit and drill 12¼" hole to 2630~. Run formation leak-off test to 12.5ppg EMW. As of 8/31/80, drlg 12¼" hole below 2630'. 14 I hereby ~~c°rrect SIGNED ~~g~~ii~~~~TiTLE. Distr~ct DrilliB ~__~q.~_,~, DATES~ii~'~' ~' ]] ]~ll}~} mOT£-Report on this form is requ,rad for each calendar month, re§ardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeed,ng month,unless otherwise directed. Ho~le H. Hmniltc~ To wi~ B.O.P.E. Teet Well No. 17-4, A~00, Sec. i8~10N-R15E ~4. Permit No. 80-85. O&G #4 4/80 ¢ STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Inspector ~.~.A ,~//~ //~/~ Operator ~ ~'/' ~ Well / 7 ' .~ Location: Sec 2 ~/ T/o~3R ]~-FUM Drilling Contractor ~'~ Well / 7 -- ~ Representatzve /f~/2 Rig # Permit # ~ d - ~5-- /~Caszng Set @ ~O~~ ft. ~ Repre sentat iv~-,7/Y~ R~d~ .z~Ff)/ Location, General Well Sign General Housekeeping Reserve pit Kig BOPE Stack Test Pressure ACCUMULATOR SYSTEM Full Charge Pressure... ~ ~ ~9 ~ ps~g Pressure After Closure ./~ ~ psig 200 psig Above Precharge Attained:- Full Charge Pressure Attazned: ~-- N2 A/~, 2 ~ 6D, ,~Z~), .~.20~,,~;~psig Controls: Master ~/~ Remote ~/~ Blinds switch coverD/~ Kelly and Floor Safety Valves Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Z"O00 Upper Kelly Lower Kelly Ball Type Inside BOP ¢ Choke Manifold No. Valves NO. flanges ~,~ Test' Pressure Test Pressure .... Test Pressure Test Pressure Test Pressure._~-'~ ~ ~ Adjustable Chokes Hydrauically operated choke_ / Test Results: Failures Test Time ~ hrs. Repair or Replacement of failed equipment to be made within Inspector/Commission office notified. ------days and __min. ~ sec min -- sec Distribution orig. - AO&GCC cc - Operator cc - Supervisor Inspector ' ' August 18, 1980 I~. P. A. VanDu~en District Drilling Sngineer ARCO Oil and (ho Company P. O. Box 360 Anchorage, Alaska 99510 Prmlhoe Bay Unit D8 17-4 Atlantic R~ch£ield Company Peru~t No. 80-85 SUE. Loc. s 248~*Sw 450'E o£ iqW or Sec Bottomhole ~.i ~320'S, 2320'U o~ NB or Sec 28, TI0H, Dear ar. VanDusenz Bncloaed ~s the approved applioat~on for permit to dr~ll the above re£erenced ~11. ' This approval ts conditioned on your application for exception to Rule 3(£) o£ Conserv&tloa Order No. 145. I£ this exception is not granted the completion o~ th~s wall will have to con,cnn to the re~er'enced conservation order. Well samples, core ch~ps and a mud log are not required. A d~rec~onal survey ~s requAred. If available, a tape contain- ing the d£gitized log in£ozlaat~on shall be submitted on all loqs for oopyin9 except experi~ental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been class£££ed as important £or the spawning or migrat~on o~ anadromous f~sh. Operations ~n these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title Alaska Ad~tnistrative Code). Prior to commenc£ng operations you nay be contacted by the Habitat Coord~nator*s off,ce, Departnent o£ Fish and Game. Mr. P. A. VanDusen Prudhoe Bay Unit DS 17-4 -2- August 18, 1980 Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article ? and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS $8.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this ~x~it to drill. To aid us in scheduling fieldwork, we would appreciate your not/lying this office within 48 hour8 after the well is spudded. #e would also like to be notified so that a repre- sentative of the commission may be present to witness testing o~bleieo~t p~oven~ equipment before surface casing shoe is drilled. In the event of suspension or abando~nt, please give this office adequate advance notification so that we may have a witne.ss present. Ver~ truly yours, Hamilton Chairman of ~Y Oag:a O~ TH~ ~'~'"~ ~ Alaska Oil & Gas Conservation Commission Enclosure o.c: Oepa~nt of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o/anti. Department of Laborr Supervisor, Labor Law Compliance Division W/O encl. ARCO Oil and Gas (~ oany Alaska D~st n~N Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 August 8, 1980 Hoyl e Hami 1 ton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS. 17-4 Permit to Drill, Rule 3(f) of Conservation Order #145. Dear Mr. Hamilton' Enclosed is a Permit to Drill outlining our plans for drilling and completing DS. 17-4 with an 9pen-hole typ~ co...m.p]e, ti_o_n_. This type of completion was selected to improve oil production in DS. 17-4. ~_~An exception to Rule 3(f) of Conservation Order #145 requiring drilled hydrocarbon zones to be cemented behind pipe is request- ed so that we may evaluate this type of completion. Included also are the $100.00 filing fees and the required survey plats. Very truly yours~ P. A. VanDusen District Drilling Engineer PAV/TK:ruo ARCO Form 10-401 REV. 9-1-78 STATE OF ALASKA SUBMIT IN TRII~ fE (Other lnstructl6q on reverse rode) ALASKA el L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL OR DEEPEN la TYPE OF WORK DRILL ~-~ b TYPE OF WELL OIL GAS DEEPEN []] SINGLE MULTIPLE OTHER ZONE [] ZONE Atlantic Richfield Company 3 ADDRESS OF OPERATOR P. O. Box 360, Anchorage, Alaska 99510 4 LOCATION OF WELL At surface 2486' S, 450'E of NW cr Sec 22, TION, R15E, UM At proposed prod zone 1320'S, 1320'W of NE cr Sec 28, TION, R15E, UM API # 50-029-20498 6 LEASE DESIGNATION AND SERIAL NO ADL 28334 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9 WELL NO DS 17-4 (xx-28-10-15)... 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe Oil 11 SEC, T, R, M, (BOTTOM .D 0 01 HOLE OBJECTIVE) Sec. 28, TION, RISE, UM 13 DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12 5 Mil es NE of Deadhorse, Alaska 14 BOND INFORMATION ~EStatewide Surety and/or No Federal Amount 100,000 15. DISTANCE FROM PROPOSED * 17 NO ACRES ASSIGNED LOCATION TO NEAREST TO THIS WELL PROPERTY OR LEASE LINE, FT (Also to nearest dng, um,, ff any) 1320 160 20 ROTARY OR CABLE TOOLS 18 DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT 4759' 21 ELEVATIONS (Show whether DF, RT, CR, ctc) Pad Level - 30' RKB-70 Insurance Co # 8011-38-40 16 No OF ACRES IN LEASE 2560 19 PROPOSED DEPTH ll,838'M.D. Re ta ry 22 APPROX DATE WORK WILL START 9/4/80 23 PROPOSED CASING AND CEMENTING PROGRAM ,, SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quanmy of cement 32" 20" 941b. H-40 80' ZSO sx Permafrost II to surT. "17-1/2',', 13-3/8" 72Lb. L-B0 Z/OO' Circ. to sUrf. (approx. 2500 sx}! '1'2-1/4 9-5/8" 471b. S-95 10,930' +__500 sacks (Circ to +_. 500 above ,ndu Sag River) See Attached Page 1980 IN ABOVE S~ACE DESCRIBE PROPOSED PROGRAM If proposal IS to deepen g~ve data on present productive zone and proposed new produc~e zone. If propel Is to ~ or deepen ~ectlon~y, ~ve pertinent data on subs~face locations ~d measured ~d ~ue ~tl~ d~s. Give blowout preventer pro. am ,, 24 I hereby ~that ~e Fbr~lng ~s ~ and Correc~ _ ~ / , ~ __ ~ (Tl~s space for State office use) CONDITIONS OF APPROVAL, IF ANY SAMPLES AND CORE CHIPS REQUIRED I MUD LOG [] YES ~ NO [ [] YES XNO DIRECTIONAL SURVEY REQUIRED RYES [] NO OTHER REQUIREMENTS A P I NUMERICAL CODE ~-o- ~ zq- PERMIT NO. gO --,¢~'_ _ APPROVAL DATE APPROVEDBY ~~~ TITLE ~i' ~:,~.~ 0 I"[ O~,P.~]SSION *See Instruction On Reverse Side Au_crust 18~ 1980 Date OR/18/R~ O Permit to Drill Proposed Program Atlantic Rij_'tJlY]eld Company proposes to.Airectionally drill this well to 11,818'M.D.,~ to produce the Sa(~rochit. 12-1/4" hole will be drill- ed to 10,896'H.D., 8930's.s. (estimate~op of the Sadlerochit). An 8-1/2" hole will be drilled to 11,818'M.D.,~~s.s. (estimated T.D.). Open hole logs - - · + I will be run from T.D. to shoe of surface casing at _2700 M.D., 2630 S.S. A cement plug will be set to 10,758'M.D., 8830's.s. The 12-1/4" hole will dressed to the top of the Sadlerochit, and 9-5/8" 47# L-80 & S00-95 casing will be set at 10,896'__M._._D_._, 8930'ss. The casing will be cemented with +500 sacks cement to +500' above the Sag Ri~v_elk. Below the 9-5/8" casing shoe, an 8-1/2" hole will be ~rilled t,o, +10,951~~s.s. The 8-1/2" hole will be opened to 14". The base of the 14 ~ole will-be + 40 below the 9-5/8" casing shoe.¢ A 13-5/8" 5000 psi RSRRA BOP stack will be u-sed. It will be pressure tested each week and operationally tested each trip. A string of 5-1/2" 17# L-80 tubing, packer, and necessary pro- visions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A nonfreezing liquid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator, tested to working pre- ssure, will be utilized with all wireline work. The downhole safety valve will be installed and tested upon conclusion of job. Based on data from other wells drilled into the Sadlerochit, the maximum bottom hole pressure to be encountered is 4669 psi. If a gas bubble at bottom hole temperature and pressure were to rise without expanding but cooling to 80OF, it would exert 3820 psi on the BOP equipment. The 13-5/8" 5000 psi RSRRA BOP stack will be tested to ~000 psi. · ~ 16115 I ! HEREBY CERTI~~T PROPERLY REGISTERED- AND LICENSED TO PRACTICE LAND SURVEYING THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS AN AS- D.S. ]7 - CONDUCTORS ] THRU 6 BUILT SURVEY HADE BY ~E, AND THAT ALL DIHENSIONS AND OTHER AS-BUILT LOCATIONS DETAILS ARE CORRECT, AS 0F' DATE STATE PLANE LAT & LONG Y = 592779~.39~ ~. Y = 59281~.192 X = 708786.75~ X = 708702.5~6 LAT = 70°12'21.846' LAT = 70o12'25.308'' LONG = 148°18'59.678'' LONG = 148°19'01.841'' 2. Y = 5927910.446 5. Y : 5928260.936 X = 708758. 898 X = 708674. 050 LAT = 70°12'22 995" LAT = 70°12'26 464" LONG = 148o19'00.394" LONG = 148°19'02.574'' 3. Y = 5928027.297 6 Y = 5928376. 895 X = 708730.871 X = 708645.462 LAT = 70°12'24.151'' LAT = 70o12' 27.611~ LONG = 148°19'01.113" LONG = 148o19' 03.331" ii I I I I II I II Ill II II II II AIlanlicRichfieldCompan~ ~ DATE: DRAWING No: NORTH AMERICAN PRODUCING DIVISION ALASKA DISTRICT- PRUDHOE BAY I I II I ARCO OIL AND GAS t , , , ~ j U- :), ~,L I., NELL IqU; PRUDHOE BAY, NORTH SLOPE,, ALASKA J -,~-~ .... _ _ u ......... ~ , , ~ ,, , , , - -:--~nnn :" :' ' [ 1 - I - , / , ::':::::~: ::: ::::::::::::::::::::: ]~ :L~TT: ~:L~:_~_]L~VB~37~ O- ~=3700~ DEP=O ~ ........ ~ - /~ - :'. -'-::: ~ ........ ~ ..... 0~ ........ ~ ..... ~ ..... .................. :-:. :::::: , _. _:~:': :-:: :--:::- ~o ~ ::' ~ooo ~ .... :moo ~ ,ooo- . ~mo - moo -~-~ r-- ~ :~- -~-~ t- '~.Z:~- ~ ..... ~ .... ~ ...... 4-, :~t *~. .:-~. r ~ ! :' ::~-i 13-5/8" buP STACK DIAGRAM PREVENTOR le e Accumulator Capacity Test Check and fill accumulator reservoir to proper level with hydraulic fluid. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. BLIND RRHS e Observe time,then close all units simultaneously and record the time and pressure remaining after all units are closed with charging pump off. e Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1100 psi remaining pressure.) PIPE RRHS ' 13-5/8" BOP STACK TEST Fill BOP stack and manifold with non-freezing fluid. DRILLING SPOOL e Check that all hold down screws are fully retracted. Predetermine depth plug will seat & mark running joint. Run test plug on drill pipe and seat in wellhead. Run in lock down screws i n head. PIPE RRMS e Close annular preventer and chokes and bypass valves on manifold. Test all components to 250 psi and hold for 10 minutes. Increase pressure to 3000 psi and hold for 10 minutes. Bleed pressure to 0 psi. Close top set of pipe rams and open annular preventer. Increase pressure to 5000 psi and hold for 10 minutes. Bleed pressure to 0 psi. Close bottom set of pipe rams and valves directly upstream of chokes, then open top set of pipe rams and chokes. Increase pressure to 5000 psi and hold for 10 minutes. Test remaining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. 10. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for 10 mir,. 11. Bleed pressure off all equipment open bottom preventer. Make sure manifold & lines are full of non-freezing fluid and all valves are set in drilling position. 12. Test standpipe valves to 5000 psi. 13. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 14. Check operation of De Gasser. 15. Record test information on Blowout preventer test form. Sign and send to Drilling Supervisor. 16. Perform complete BOPE test once a week and functional operate BOPE daily. -18- ' CHECK LIST FOR NEW WELL PERMITS Company Item .Approve Date Yes No (1) Fee ;4&oRr ~-/J-$=a.~;~, 1. Is the permit fee attached .......................................... 2. Is w~ll to be located in a defined pool ............................. Lease & Well No. ~-/e_) Remarks 3. Is a registered survey plat attached ................................ /~j~ . (2) Loc. ~_~3~' 4. Is well located proper distance frcm property line .................. 5. Is well located proper distance frcm other wells .................... 6. Is sufficient undedicated acreage available in this pool ............ 7. Is well to be deviated .............................................. 8. Is operator the only affected party ................................. /~oC . 9. Can permit be approved before ten-day wait .......................... /~0~' __ (3) kSmin. ( 4 ) Ca. sg. (5)BOPE ~.~.~ 12. Is administrative approval needed ................................... .,, 13. Is conductor string provided ........................................ ~ 14. Is enough cement used to circulate on conductor and surface ......... ~ · 15. Will cement tie in surface and ineermediate or production strings ... ~16. Will cement cover all known productive horizons ..................... 17. Will surface casing protoct fresh 7rater zones ....................... ~ 18. Will all casing give adequate safety in collapse, tension and burst.. ~ · 19e Does BOPE have sufficient pressure rating - Test to O'-oo~ psig · e ~ Approval Reccmmended: Additional Requirements: 10. Does operator have a bond in force 11. Is a conservation order needed .................................... Geology: Engineering: HWK ~ LCS BEW JAL rev: 03/05/80 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. LIBRARY TAPE CURVE SPECIFICATIONS Company Arco Oil & Gas Co. Well DS 17-4 Field Prudhoe Bay County,State North Slope, Alaska Date 10-29-80 Curve Name (Abbreviated) Standard Curve Name Logs Used Scale GR G,amma Ray _ ,. 'CN/MS ~ , 0-100 SSN Short Space Neutron , CN/MS 0-2000 LSN Long Space Neutron .,. CNZMS 0-2000 NEU N. eutron ..... CN/MS 60-0 ., ... PAGE 1 ARCO OIL & GAS-- .... 9.S. 17-4 DRF~DHOF.BAY ..... NORTq SLO~E,ALa$<A WLAC 6490 DATA EVERY 1 SadDLES _ _ .... t.O Lo&,_O__O_ ..... 9_..~_,~__9 ...... ~0_~54 __. 7_U~7_ ........ ~.&~9_7: ............................................................ ___tO LQO~._5._O_ __ !_02,78 .... _8_77_. ~e .... 7~_9_.,.0_~ ..... ~.6,_r~_~ ...................................................................................... ..... _~_0!_0_! ,_ 0.0.. ~ 0 t_~6 _9 _ _~._9_Ltt_ ........ 7E~5__9_ .... ~6_~ 8 ? ................................................ ..... ~ _0!_.O_L 5_0 ! 0 ~, _98.. ¢_9_.~.~5_5 ....... 7.1._~_,__25 .... :t6~..6! ..................................................................................... 1 ~_t._O 2 ,_ _o_Q ..... _1_._o!_0_~_.~._~_0 ....... ~...0_$.,_~_5 .... .6.9..7.~2__2_ ...... 7_0__9....~03 :S&,_l~ .......................................... .... ¢__t_o_~.,_~__Q ..... i_o_~.,_~_ ....... ~. ~ ~ ..... ~_o!~s.? .... ~..~ .............................................................................................................. .......... ~...._o__~__Q~_.,.~..~ ....... ...t.._~.~...,_~! ....... ..~.~.,..~ ..... ?~_o__,.~_s .......... ~...~_~.~ ......... ........ :...O_~_O__~.__Q.O ...... :~_!.,_'.+_.~ .......... ~!7...J.__*_ ........ ~!_0.,_2_5_ ........... ~Z~Z_5 ...................... _:.i_i.:. :_..: :..:_ 2:1:i~i_'__.:..i_:::::::::::::::::::::::::::::::::::::::::::::::::::: J 0_1.0_.~.,..?0. lO7 ....... tO_to_?...,_._O.._O .......... t0_6_,__2_o ........ 7_Q_O...,_8_~ ........... 7..o_% 15 ....... !5,__.~_4 ........................... ....... .~_.o.~.o_.~..,...~..o ............... ~..~!,..~..~ ........ 6~.,.~.~ ..... :..._u,,.?~ .............. :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 10107.00 ~00o10 688~67 ......... ~_.~.!O_7_,_~..0_ .................... j OtlO,O0 102.42 674,02 713~9~ 33.87 lOllt,O0 9~.2~ 66~,26 710.25 ~5,00 ~0112.00 90. 10113,00 1011~.00 97.1! 10115.00 97 1011~.00 94 10117,00 89.~5 6q. 2.29 687.06 35,30 ~Olla,OO 86.55 101!o.00 94.~6 638.62 677.P_9 39.2§ ~,,0120. O0 9P.65 ~2,52 655.~2 ~9.21 10121.00 87.65 6 ~,~ 08 652.88 38.92 ..... ]O12X.O0 8~L~O ~4~%9 679.74 3§°63 ~ 012~.00 8~.1l S78 91 705 ... '~ 012~.00 87. t41 702t10 715~1~ 33,50 .............................................................................................................................................................................. ............................................................................................................................................................................................................. ! mAGE mRI'IDHOf · B 3AT/~ ~RCO OIL & GAS ...... g.S. 17-~ AY ..... KIORTq SLO~E,AL~S4A HL~C Y I 1012_7_,_5 ...... 1__0__1..28,0._0_ G R_ ........ SS_~ ............ LS.N_ .......... ~lEiJ 8_7_,_~.1 .... 7_0_.0_.~ ..... Z22 _- 4. 6, ........ ._33_.21 8&,?_? ~695,~55 __751_._01__ .... 33 ~ 8 _ $_Z_L0.) . 6..9__~,_1._! ..... 72._9_..._7___~ ....... 3 {4 . 5E _8__~ ,P.. 3_ 68_~_,8 ~ _..7.~,_6_,__1_2. ...... 55,6.6 1015'~,50 7'~,98 705,76' 7t1.~7 1 013~.50 GG.~I 691~ 1 691~ 38.70 I 01~,50 67,51 667,92 678.52 35,~1 1 0136.50 90.,"52 639.8~ 68~.62 36.~7 10137.50 80 lO13a.5o 78. 10139,50 85. 101~0.50 88, 10141.50 89. I 01U~9.50 89..36 696.00 705. :57 37.68 101~.50 91.n7 70~.5~ 706.59 36.65 101~.50 90.32 725.29 7~.90 I 0 lq.r-, . 50 89.24. 726.51 751.76, 32.18 10147.50 97.53 711,87 751,76 32.26 101~.~.50 95,83 693.55 7~1.99 31,89 .............. ........................... ::::::::::::::::::::::: .............. :~::~:~::; ~..::5:::::::::~:::::::~::~ ~JS:~ :~.. J~._ ~ ::..;:.~.~..~ ................... ~, ..................................................................................................... ~,, .................................................. ::~=...: ................. ~.......:__:~ .................... :.~::._..~.~,.:.~:~.z..~t _ ;~::~s ~.~.~;~ ................ ~J~,,~ .J~:~L~..~:~ ......... .t.O.!..~_.O._,..~.q ............ !.~.5.~76 ............. 6A~_,_.~.! ........ 7_~.!,,.~.% ........... ~.~..S_~_ =A'GE ~ ARCO OIL ~ GAS ...... =,R,IDH3~',BAY ..... ~IO~TH SLOPE,ALaSKA DATA ~I~RY 1 17-~ HLAC 6~BO 101~1,00 91,31 ~52~...0.5 72~12 101~2 O0 ) 70 6~.7 1_.7 70~+ 15 35 1~ 016'~ O0 ln16~.oo 90 10165,00 97.1 0 0 9 1 0169,00 95,95 6~0~0~ 710~5 10170.00 9~.97 62 ~.j 5 ~ 701~71 31.~5 .......................... ~_~7~, 00 ~9,73 6~3~1 66~5B 3~20 I O17A,O0 9~.~g 650,..83 ~67,53 :~Ar~E ~. ARCO OIL & GAS ...... :>FtltgH'F~F 'BAY ..... NORTH SLO:>E, 3&TA E"vFRY 1. SA,~LES 17-~ ~LAC GNBO 1 0 l. Rq.. 50 99.98 58,7.35 G~9.22 36.32: I nls~.~O 98, ~.5 5~7.3~ 6~8.00 3G,~3 1 018~,50 96.19 587.35 6~.3~ 37.G~ 10188.50 9P.1 10189.50 8G 10190.50 76.0 101.9:1.50 10192.50 1Olgz.~¢ 82.52 A03o~2 68~.6~ 32.33 10194.50 83.38 GO~.~ 697.06 35,t5 91.07 6,02.00 6,60.21 T~'~''' ~"' ~'~ ~;~' ..~.~'~ ~?~ ~~'~ 8~.11 5R3,G9 661 ~3 ........................................................ ]}?:y~'~;;? 1111 1111 11 11 11 11 It 11 11 11 111111 111111 00 00 O0 O0 O 0 0000 06 0000 O0 ~)0 O0 OfiO0 00 00 00 O0 O0 O0 O0 0(90000 000000 77 77 77 77 77 77 71 77 ll 71 77 77 Do0000 000000 O0 O0 O0 O0 o0 o000 O0 0000 O0 OD OO O0 O0 O0 OOu0 0000 O0 O0 O0 O0 O0 OOO000 000000 7777 77 77 7i 17 77 77 77 77 77 77 77 77 1111 1111 ~ 1! bt6bbbbb 11 (bbbbOb6 1~ hb b6 11 bb Ob 11 ho bb 11 66 Ob 11 o6b~bb 111111 ~obbb66 111111 · 0000OO 000000 O0 O0 00 OD O0 O0 0000 O0 O0 OD O0 O0 O0 0000 OD 0000 O0 O0 O0 O0 O0 OOOOO0 000000 333~3] 33 33 33 ~ 222222 222222 22 22 22 22 22 22 22 22 22 22 22 22 2222222222 2222222222 cccc ~ k-®% C k ~ Y C k ~ C ~ C ~, ~ ~ C K ~ CCC¢ ~ ~ Y ¥ *S3A?T* USER I-'CAL MUN[[IJ~ f:,WS KLIOk4(; *SI AH'I* USEI~ PCAL Fi.- PP P P i-'FPP P F [tO707,b1032] Ski'-UO. *~TARI* I]0707,01032J ['ART* P RP, I~ b O DDI)D D D U Ij D ~ R U b D kRRi~ b U O P ~. U U D ~ D U lj P k ~ UUUbU DDDD O tJb job SHIP H H UO0 EEEEE D H H O O E D H H O O E D nHHHH O O EEEE O H H U O L O H H b 0 E H H 000 EEEEL 4127 DATE IO-UCT-80 08:14:3b 4127 DATE 10-UCT-80 08:14:3b 1111 I1[1 I1 ti II 11 1I I1 llI[ IlIl FPPPPPPP PPPPPPPP PP PP PP PPPPPFPP PPPPPPPP P~ PP PP PP PP PP PP PP PP PP TTT'I 1. r ['q I l 'ITTI 'r I 1'l 'I i 'r I (;U UU [' T [j 0 O 0 T [ fib OtJ T P O0 (~t~ F ~ O0 rl' OC (JCl Y f tJ [ t.j U I I (JO r T bOOUt~tJ T/ gbOtjll(I 4127 IO-(ICT-80 DATE IO-UCT-80 08:14:3~ 07:t2:03 15:10 C~¥ PCCC PCCC THA~tV 5 .... VV VV k~ ~ kk VV VV EE HR Rk VV VV GE ~h RH VV VV EEEE~,kkh ~RPH~ VV VV LEEEEEEE ~PR~H~H VV VV EE H~ PP VV VV ER ~h ~R VV VV ~,F ~ ~F VV VV gE PP HP VV EE~E~kLEb~ ~H RR VV EEE~EEEEEE ~P ~R II1111 111111 I1 11 11 II 11 11 11 1I 1I 111111 111Ill YY YY YY YY YY YY xY YX O000Oo 0o0000 44 44 000000 oO000O 44 44 Ou O0 O0 O0 44 44 O0 ou O0 Ou 44 44 O0 o0~0 O0 0o0o 44 44 O0 oOOO O0 o000 44 44 O0 Or) O0 ~)0 O0 O0 44444~4444 O0 O0 O0 O0 O0 O0 4444444444 0000 00 nO00 O0 44 0000 Ou 0000 O0 44 O0 gu On O0 4~ O0 uO O0 Ob 44 000000 OOOOOO 44 OOOOO0 000000 44 4127 l)Alk 10-0CT-80 08:14:3b IO-OCT-WO OR:Oo:2g V SCHLUMBERGER COMPUTING CLNTL~ 10707,61032 TAPE DATE: 80/10/ 4 i APE, TAPE t'~ ANL: 61032 1.) A ~l'L: 80/10/ ~LEv1. CF NAN,': LDI'[ TAPE C[]N~[1NUATlfJN N[JM~LH: O1 CASll':(, IJNII, LER 9ot~25010080/RI'I SIZE 8.5/I-~UID TYPE IaZGNO,.SULFONATL/ L~LNb lO.?/Vl~C 41oO/PH ll.5/~I. UID LUS~ 4.2 Mh/RM ~M~ 1.02@60 ~/RHC 1.58~e0 I~/NAX RLC ~MP 193 IL'AI~EN I~PlJ[~ RIJN#2 D1L IL, i.~GGt':D JOSLP~O TH[. ,SPLU CUHVE IS ACrUALL¥ A LL-,8 ABOVE 10795o F l. bE` ~t[~ ADEP i,1-. N(;'I Id: 62 bXTEb [bE I'}ANL: LDII .001 b'~AXlt,~U~ PHYSICAL RLCtJRD LfiNGTtd: PREVIL'llE ~'ILt: NAME: 1024 w~.l,I, ,'-,ILL IN?LiHMA"IIO~'~ I~LCEED I,E`NGI ti: 168 w ~'.I,L: RANGE: l'()w ~,1: 5F C I It~: ARCO LRI LL~S I I'L 17-4 P [,'llD H(] E BA~ 15L 1ON 5~. SLOP E ~LAS~A 0 SIZE 1 CODE 0 ,)AIIJlv, ~PFC1F I. CAIlOa bL,(,CKS: ¥ JC 11J£JIL~ SV~PD~ ILL) jilL &~LU (, F C N L CALl CNL Db HO F DC NPBI CNb N ~, A'l CNL NCt~L CNL F('NL CNb D~[ t~NiIS AFl APt AP1 APt Flhg# 81Zt gxP Fl 0 0 0 0 0 4 0 ~ V ? i O, 0 0 ~ 0 UHNN 1 12 46 0 0 q 0 UM~ 7 12 44 O 0 q 0 OHM~ 7 22 1 0 0 q 0 GAPI 42 31 32 0 U 4 0 ia 42 28 1 0 0 ~ 0 G/( J 42 44 0 0 0 4 0 G/C J 42 35 I 0 0 4 0 C/C q2 42 1 0 0 4 0 CPb 42 ~4 92 0 0 4 0 CPS 42 34 9] 0 0 4 0 GAPI eO 31 32 0 0 4 0 IJS/F ~0 52 32 0 0 4 0 PROC SA~ RI~P DEPT 0 1 08 0 0 1 b8 0 0 1 b8 0 0 1 68 0 0 I 08 0 0 1 68 0 0 1 b8 0 0 1 6~ 0 0 1 58 0 0 I b8 0 0 I 68 0 0 I 68 0 0 1 68 0 0 1 68 0 0 1 b8 0 119t~5.000 119O0.000 I ! 70C. 000 1 160U.¢)00 11500. 000 t I lO0. 000 ll~uO.O00 l~2u0.u00 11100.000 11090.000 8P C ~ aP SP G P, G P, GI~ SP G}, SP GF IeHOB bP G~ GP, GF VALIIE -46.q38 40.438 2.b49 92.188 -50.313 40.438 2.549 99.438 -8] .6e~ Z].891 2.4~4 22.484 27.70~ 2.271 2~.875 -78.875 ]1.~2~ 2.256 25.328 -71.56J 21.734 2.30~ 21.~1~ -59.219 27.797 2.252 23.578 -57.063 34.0]1 2.3%2 27.219 -24.984 78.625 2.555 85.125 -29.188 75.4j8 2.570 -10.3o5 91.063 2.0R2 78.438 NbEMONIC ILD CALl NRAI DT ILD CALl NNAT DT iLt) CALl N~A~ DT ILD CALl NRA/ DT lED CALl DT ILD CALl NMAT DT CALl NRAI DI CALl NRAT OT JLD CALl OT ILD CALI NRA'I DT ILD CALl NRAT DT VALUE 5.504 7.355 2.391 79.188 4.828 1.]55 2.~91 78.56~ 2.795 8.539 2.297 69.188 1.271 8.)75 2.563 9~.J75 1.673 8.406 2.533 89.750 2.061 8.430 2.352 88.750 1.947 7.781 2.{91 89.750 2.658 9.008 2.660 q2.750 7.973 7.598 2.305 8].188 98.938 10.164 1.~26 57.594 1.827 15.695 4.082 99.503 MNbMONIC DRHU NCNL NCNb ILM DMHU ibm DRHU NCNb 1LM DI~H[J i~C NL IbM NCNL IL~ NCNL iLM NCNL DRHO NCNL DRHU NCNL iLM DBHO NCNb VAhUE 4.914 0.280 3566.000 4.734 0.280 3566.000 2.977 -0.0i7 3510.000 1.395 -0.016 3180.000 1.724 -0.010 3]18.000 2.217 -0.003 3526.000 2.070 0.0]8 3258.000 2.781 O.Olo 3074.000 8.570 0.098 3148.000 79.500 0.016 4868.000 1.80i 0.012 1531.000 MNEMONIC 8FI,U NPH1 FC NL SFLU mPHl FCNL SFbU NPHI I~CNL SFbU NPHI FCNL 8FLU NPHI FCNL SFbU NPHI FCNb SFLU NPHI FCNL SFLU NPttl FCNL SFLU NPHI ~ CNL SFLU NPHI FCNL SFLU NPHI FCNL VALUE 5.242 26.025 1528.000 5.005 26.025 1528.000 7.855 23.291 1588.000 2.31~ 27.490 1272.000 2.168 27.002 1335.000 2.893 24.208 1539.000 2.781 25.635 1395.000 3.986 28.174 1211.000 10.188 24.512 1477.000 420.250 6.738 4092.000 2.207 48.340 400.750 I) ~ P 10900 tORO0.000 1 .q7 t)o. 000 t0600.O00 10%t)U. 10~,0o.000 10 ~}()0. o00 10200.000 10000.000 qq(}o. ()00 Si- P, hUb GP bi.-' DItiJB Gl-,' 8~ GR GP p SP G t~ SP GP G~ SP GR GP VALUL -10.2o3 102.750 2.457 89.56~ -11.3t~ 2.4~1 9J.56~ -166.000 09.063 2.482 109.06] -160.500 -999.2~O -999.250 171.875 -15t.750 -999.250 -999.25O 183.500 -162.875 -999.250 -999.250 16~.250 -192.000 -999.250 -999.250 115.1~8 -175.250 -g99.250 -999.250 158.000 -191.125 -999.250 -999.250 197.125 -188.750 -999.250 -999.250 133.~75 -999.250 -999.250 175.75o Nhk MUM lC ILD CALl NRA% CALl NRAI DT 1 L D CALl DT ILO CALl NRAT bT CALl NRAT DT 1LD CALl DT iLO CALl NRAI OT ILD CALl NRA'[ DT ILD CALl DI ILO CALl NRAT DT ILD CALk NAAT DT VAbtlr~ 2.~75 15.031 ~.~54 114.563 2.174 11.484 3.492 95.188 2.56] 15.56] 4.i45 97.~75 3.232 -999.250 -999.250 100.1~8 5.527 -999,250 -999,250 81.750 ],075 -999.250 -999.250 98.750 5.756 -999.250 -999.250 79.O00 2.845 -999.250 -999.250 99.t75 ~.920 -999.250 -999.250 90.563 4.230 -999.250 -999.250 7h.OO0 2.582 -999.250 -9q9.250 92,750 MNEMON1C ibm Dkh0 NCNL ILM ~CNL DAHO URHO NCNL ILM DRHO NCNL v~C N b ILM Df~HO NCNL NCNL ILM NCNL ILM N C N b ILM DRHO NCNL VALUE 2.281 O.077 1787.ooo 2.164 -0.000 1930.000 2.665 0.0t2 1560.000 ].016 -999.250 -999,250 5.4]0 -999.250 -999.250 3.146 -999.250 -999.250 5.344 -999.250 -999.250 2.922 -999.250 -999.250 3.820 -999.250 -q99.250 3.88] -999.250 -999.250 2.615 -999.250 -999.250 8fbO NPH1 ~ CNL SFhO NPHi SFLU NPHI FCNL NPHI FCNL NPHI ~CNL 8FbU NPHI FCNL SFL0 NPHI FCNL SFLU NPHI NPHI FCND SFL, U NPHI FCNL SFLU NPHI FCNL VALUk 2,561 510.750 2.236 39,111 525.500 2.914 45.875 402.250 3.979 -99925.000 -999.250 b.816 -999.250 -999.250 4.445 -999.250 -999.250 8.078 -999.250 -999.250 ].719 -999.250 -999.250 4.395 -999.250 -999.250 6.b05 -999.250 -999.250 3.326 -999.250 -999.250 q7uu. O00 9o0(). ~)00 95(,)0. 000 94(:0.000 9 ]00. 000 000 9100.OO0 '4()00. 000 8900.O00 8800.000 GP, HH(}B GR GR H H tJ b Gh SP GH f,, FItJ B bP GR GR SP G~ bP G~ GR SP GH GF -190.125 -999,250 -999.250 192.250 -194.000 -999.250 -999.250 172.375 -194.25(J -999.250 -999,250 96.938 -196.875 -999.250 -999.250 95.563 -190.500 -999.250 -999.250 90.188 -192.750 -999.250 -999.25o 95.1q8 -1~e.125 -999.25o -999.25,) 98.375 -18b.250 -999.25() -999.250 lOl.ObJ -189.OO0 -999.250 -999.25O 74.813 -189.125 -999.250 =999.250 86.000 -191.000 -999.250 -999.250 92.b25 CALL DT CAbI NRA~ bT ILO CALl NRAI DT ILD CALl NRAT DT IbD CALl NRAT DT ILO CALl NRA1 OT ILD CALl NRAT DT CALl NRAT DT iLD CALl NRAT DT 1LD CALl NRAT DT 1LD CALl NRAT DT VALI}K 2.281 -999.250 -999.250 91,750 2,O06 -999.250 -999.250 102.188 2.256 -999.250 -999.250 86.503 2.885 -999.250 -999.250 83.750 2.582 -999.250 -9qq.250 86.000 2.844 -999.250 -999.250 84.375 2.794 -999.250 -999,250 84.750 2.320 -999.250 -999.250 88.750 2.063 -999.250 -999.250 85.000 2.018 -999.250 -999.250 93.503 2.096 -999.250 -ggg,250 90,{75 DRHO NCNb DRHU NCNB 1LM DRHO NCNb DRHO NCNL i LN DRHU N C N L DRHO NCNb DRHU NCNL DRHU NCNL u~HO NCNb DRHU NCNb DRHU NCNL VALUE 2.139 -999.~50 -999.250 2.090 -999.250 -999.250 2.223 -999.250 -999.250 2,904 -999.250 -999.250 2.621 -999.250 -999.250 2.863 -999.250 -999.250 2.740 -999.250 -999.250 2.230 -999.250 -999.250 2.066 -999.250 -999.250 2.020 -999.250 -999.250 2.107 -999.250 -999.250 MNkMONIC NPHI BCNb NPHI FCNL 8P bO NPH1 ~CNL SFLU NPHI FCNb SFbU NPHI FCNL 8FLU NPHI FCNL NPHI FCNL SFBU NPHI FCNb SFLU NPHi FCNL SFLU NPHi FCNL SFLU NPH1 FCNL VALUE 2.855 -999 .~50 -999.250 2.541 -999.250 -999.250 2.O31 -999.250 -999.250 3.014 -999.250 -999.250 2.842 -999.250 -999.250 2,914 -999.250 -999.250 2.992 -999.250 -999,250 2.742 -999.250 -999.250 2.402 -999.250 -999.250 2,154 -999.250 -999.250 2.342 -999.250 -999.250 D L ~ '! H P, B%¢~0.00U 8 ~00. 000 ~ :JOt}. 000 A 100. o00 800U. 7900. 000 7800. 000 7 700. 000 lw f,~ k, M I j 1,~ ].C GR bP GI~ GR SP GR GR SP G~ bP GP GR SP .RHtIB Gl,', S P GF GI~ J,,H {J IJ -18B.875 -99§.250 -~99.25o 92.813 -181.125 -999.250 -999.250 97.938 - 18 z. 000 -999.250 -999. 250 -177.875 -999.250 -999.250 129.500 -183.000 -999.250 -999.250 131.875 -180.375 -999.250 -999.250 105.125 -18~.125 -999.25o -999.250 92.938 -181.375 -999.250 -999.250 -1~1.250 -q99.250 -999.250 117.188 -195.000 -999.250 -999,250 8J.125 -195.250 -999.Z50 -999.250 t,) N I~MON lC CALl UT ILD CALl NRAT IbD CALl NRAi ILD CALl NRAT ILD CALl N~AT DT ILD CALl NRAI D~ iLL CALl NRA% DT ILD CALl NRAT UT ILD CALl NRAT DT ILD CALl NRAT PT [ LD CALl NRAI DT VALUE 2.{07 -999.250 -999.250 91.t88 2.484 -999,250 -999.250 9O.O00 2.598 -999.250 -999.250 91.375 2.4bl -999.250 -999.250 77.~75 3.123 -999.250 -999.250 92.750 3.398 -999.250 -999.250 gE.Lb] -999.250 -999.250 93,750 3.596 -999.250 -999.250 90.000 4.113 -999.250 -999.250 88.t75 3.957 -999.250 -999.250 8~.375 -999.250 -999.250 92.50] MNkMONiC ILM DRHU NC NL .ILM UHHO NCNL iLM NCNL NCNL iLM NCNL iLM NCNL ibm DRHu NCNb ILM DRHO NC N b ILM URHU NCNL DRHO NCNL DRHO NCNb VAbUE 2.318 -999.250 -999.250 2.512 -999.250 -999.250 2.586 -999.250 -999.250 2,420 -999.250 -9~9.250 2.990 -999.250 -999.250 3.377 -999.250 -999,250 2.535 -999.250 -999.250 3.500 -999.250 -999.250 3.973 -999.250 -999.250 3.949 -999.250 -999.250 ].482 -999.250 -999.250 NNLMUNIC SFLU NPHI FCNL 8FLU NPHI ~CNL SFbU NPHi ~CN6 SFLU NPHI ~CNL SFbU NPHI fCNL SFLU NPHI ~CN6 SFLU NPHi FCN6 SFLU NPHI FCNL SFLU NPHi FCNL SfLU NPHI FCN6 SFLU NPHI FCNL VALUE 2.568 -999 .~50 -999.250 2.709 -999.250 -999.250 2.879 -999.250 -999.250 4.009 -999.250 -999.250 3.305 -999.250 -999.250 3.889 -999.250 -999.250 2.508 -999.250 -999.250 3.099 -999.250 -999.250 4.000 -999.250 -999.250 3.703 -999.250 -999.250 3.643 -999.250 -999.250 ? riO0 o o00 75u 0. 7 q-U(,. 000 7300.00O 12 U 0. (.) t) 0 7 ! OO, 00() 70L, 0.000 o900.000 (-'80U. 000 6700. (')00 (~6(,0. 000 S P G G~ 5P RH(.JI5 GR GP, PHIJb G R SI-' GR ,.51-- G}~ ,,51,' GR Htt(JD YAL -22l -999 -999 83 -243 -999 51 -233 -999 -999 -241 -999 -999 58 -207 -999 -999 91 -210 -999 -999 78 -233 -999 -999 -226 -999 -Egg 13 -217 -999 -999 -208 -999 -999 -2%3 -999 -999 b3 U f, .500 . .250 .25(~ .75o .250 .250 .906 .75{/ .250 .250 .65(~ .750 .250 .250 .000 .25O .250 .813 .875 .250 .250 .b25 .00() .25<) .25<; .375 .500 · 25o .250 .93, . .250 .250 .75O .750 .25(} .25o .750 .00o .250 .25O .531 CALl NRA'I DT ILD CALl NRA1 DT CALl NJ<Al DT ILO CALl NRAT UT ELD CALi NRAT DT lED CALl NRAI DT ILD CAI,, NRAT DT ILD CALl N~AT DT ILL) ChbI NP,,A T DT LED CAI, i NRAT DT ILD CALl r~RA r VAL 4 -999 -999 2 -999 -999 90 Uk .059 .250 .250 .750 .998 .250 .25n .150 3.092 -999.250 -999.250 93.000 -999. -999o g~. -999. -999. 93. -999. -999. 92. -999. -999. 95. 3~ -999. -999. 88. -999. -999. 94. . -99q. -999. 97. . -999. -999. 91. 025 250 250 188 270 250 250 {75 736 250 250 750 600 250 250 J75 178 250 250 75O 842 250 25O 449 250 250 188 002 250 250 000 DRHO NCNL NCNL IhM DRHO NCNL NCNL ILM DRHO NCNL iLM DBHO NCNL DRHO NCNL ILM NCNL DRHO NCNL ILM DRHO NCNL UR}tO NCNL VALUE ~.602 -999.250 -999.250 ].b39 -999.250 -999.250 3.592 -999.250 -999.250 3.670 -999.250 -999.250 4.102 -999.250 -999.250 3.b82 -999.250 -999.250 3.973 -999.250 -999.250 3.713 -999.250 -999.250 4.409 -999.250 -999.250 2.008 -999.250 -999.250 2.734 -999.250 -999.250 MNEMONIC NPHi FCNL SFbU NPHI FCNL SFLU NPHI SFLU NPH1 FCNL SFLU NPHI FCNb SFhU mPHI FCNL SFLU NPHI FCNL SFLU NPHI FCNL SFLU NPHI ECNL SFbU NPHi FCNL SFLU NPHi FCNL VALUL 5.070 -999.250 -999.250 b.b7b -999.250 -999.250 5.730 -999.250 -999.250 5.773 -999.250 -999.250 3.896 -999.250 -999.250 3.740 -999.250 -999.250 5.551 -999.250 -999.250 0.078 -999.250 -999.250 5.20~ -999.250 -999.250 ~.012 -999.250 -999.250 7.563 -999.250 -999.250 6%O0.000 64O0. 000 6 {t.,O. 000 6200.000 ~ 1 oD. 000 ~000.000 590(}o000 57(~0.000 5600.000 5500. 000 GH Gl-' G~ }~ tltJ b HH[.)~ HHUP, SP Gl-' RHIJb }IHiJt5 VA[ BE -242.0 -999.2 -999.2 68.1 -999.2 -q99.2 59.9 -259 -999 -999 58 -267 -999 -999 -2u2 -999 -q9q -208 -999 -999 -229 -q99 -999 70 -270 -999 -999 52 -222 -999 -999 85 -299 -999 -999 -24q -999 -999 66 O0 50 50 2~ O0 50 ~8 · 50o .250 . 25,3 .031 .000 · 250 .250 · 500 .875 · 25o .250 .~25 .25O .250 .409 .5o0 .250 .250 .81 t .250 · 25O .250 .50o .250 .25o .000 .O00 .250 .250 .5q4 .25() .25,3 .31t MNEMLJNIC lbD CALI 1LO CALl NRAT i LD CALl mRAI OT IIJD CALl NRAT DI lbo CAI~I NRAI' DT ILO CAb 1 NRAT DT II-D CALl DT lbD CALl NRAT DS[ CAbI NMAI DT iLD CALl NHAT DT ILO CALl N?AT DT VALUE 2.811 -9~9.250 -~99.250 90.~75 2.234 -999.250 -999.250 101.563 1.757 -999.250 -999.250 96.]75 1.~09 -999.250 -999.250 99.750 2.602 -999.250 -999.250 95.000 2.428 -999.250 -999.250 105.563 t.095 -999.250 -999.250 102.188 2.783 -999.250 -999.250 11~.000 J.477 -999.250 -999.250 105.000 1.140 -999.250 -999.250 109.188 j.102 -999.250 -999.250 107.503 MNEMONIC DRHO NCNb ibm NCNL I. LM ~CNL ILM NCNb IbM DRHO mCNL DRHU NCNb IbM DRhO NCNb ILM DI~HO N C N b ORHO NCNL ILs ~CNb DRHO NCNb VALUE -999.~50 -999.2.50 2.879 -999.250 -999.250 2.414 -999.250 -999.250 1.070 -999.250 -999.250 ~.514 -999.250 -999.250 3.186 -999.250 -999.250 3.447 -999.250 -999.250 2.990 -999.250 -999.250 3.238 -999.250 -999.250 1.486 -999.250 -999.250 3.342 -999.250 -999.250 MNEMONIC S~ bO NPHi ~ CNL SFLU NPHI FCNL SFbU NPHI FCNL SFbU NPHI SFLU NPH1 FCNL SFLO NPHi ~CNL SFLU NPHI FCNL SFLU NPHI ~CNL SFLU NPHI FCNL SFbO NPHi FCNL SFLU NPHI FCNL VALUE 7.535 -999,250 -999.250 6.008 -999.250 -999.250 8.195 -999.250 -999.250 5.297 -999.250 -999.250 6.633 -999.2b0 -999.250 6.168 -999.250 -999.250 3.480 -999.250 -999.250 4.023 -999.250 -999.250 3.240 -999.250 -999.250 4.913 -999.250 -999.250 4.330 -999.250 -999.250 5 '4 ()(I. 200. 000 49O0. 000 4~00.000 4700.000 4 ~ 00.000 4500.000 '44 U 0.000 ~P Gl-, Gk Bhl]t3 GP GR PHtJB DP GI~ 5F RHUB GP SP VALOE, -241.0u0 -999.250 -999.25o 57.875 -Z43.250 -q99.250 -999.250 83.188 -292.50~ -999.250 -q99.25t} 4~.150 '250.5UO -999.250 '999.250 58.969 -263.000 -999.250 -999.250 53.188 -247.250 -999.250 -999.250 ]3.65~ -231.150 -q99.250 -999.25U -lo4.000 -999.250 -999.250 8~.875 -182.125 -999.250 -999.250 64.375 -16).7b0 -999.250 -999.250 RO.bR8 -187.000 -999.250 -999.25u 54.875 ILD CALl NBAI DT CALl NPAT DT iLi) CALl NRAI DT 1LD CAbi NRAI Dr ILD CALl NI~AT DI ILD CALl NRAY DT ILD CALl VT ILD CALl NRAT ILD DT ILD CALk NRA 'r DT ILD CALl NHAT VALUE -999.250 -999.250 1)2.{75 3.422 -999.250 -99g.250 104.56~ 1.522 -999.250 -999.250 115.000 ].410 -999.250 -99q.250 104.750 1.929 -999.250 -999.250 106.750 1.705 -999.250 -999.250 108.~75 1.867 -99q.250 -999.250 11~.000 4.367 -999.250 -999.250 107.{75 ).t58 -999.250 -999.250 110.000 4.039 -999.250 -999.250 11b.563 4.664 -999.250 -999.250 10~.000 M|~I~ M(JN lC I. CNL NCNL IL~ DRttO ~'~C N L NCNL DRHO NCNL IL~ DRHU NCNL 1 DNHU NCNL DRHO NCNL DRHO NCNL D~HO NCNL DRHO nCNL VALUE 5.301 -999.250 -999.250 3.781 -999.250 -999.250 2.02~ -999.250 -999.250 3.768 -999.250 -999.250 2.324 -999.250 =999.250 2.033 -999.250 -999.250 2.309 -999.250 -999.250 4.035 -999.250 -999.250 3.725 -999.250 -999.250 4.297 -999.250 -999.250 5.~67 -999.250 -999.250 MNEMONIC SFLU NPHI FC NL SFLU NPfli FCNL SFbU NPHI ~'CNL SFLU NPHI FCNL SFLU NPHI t;CNL SFhU NPHi FCNL NPHI FCNL NPHI FCNL SFLU NPHi NPHI FCNL SFLU NPHI FCNL VALU~ 11.594 -999.250 -999.250 4.738 -999.250 -999.250 4.945 -999.250 -999.250 5.418 -999.250 -999.250 4.80) -999.250 -999.250 4.056 -999.250 -999.250 b.027 -999.250 -999.250 4.72J -999.250 -999.250 6.277 -999.250 -999.250 5.340 -999.250 -999.250 8.039 -999.250 -999.250 -I tUU. t~OC> 4200.000 4000. nO0 ~q(~O. 000 ~ 700.0 (')0 ~00. 000 ~%OU. 000 400. 000 ~ JOo. OuO G R Ga GP G P GP SP SF' RH~IB 5P (JR RHuB ~P VAL -lbl =gE9 -Egg -18U -999 -999 54 -158 -999 =999 79 -109 -q99 -999 18 -167 -999 -999 76 UE ·250 · 25o · 000 .000 .250 ·250 .969 · 750 .250 · 25o .81~ .125 · 25o .250 .3t5 .250 · ?5O · 250 -167.500 -999.250 -999.250 76.81~ -lbO. -999. -999. 8J. -194. -999. -999. 54. -159. -999. -999. 85. -lbO. -999. -999. 77. -173. -999. -999. 66. 525 25o 81J 500 250 25O ~.~4 250 125 250 250 313 5o0 25O 250 MNE~iUNIC LLU CALl CAhi DT iLL CALl NHAT UT ILL CALl N~AY DT Ibb CALl NRAr DT ILD CALl NRAT lbO CALl NRAT DT iLD CALl NRAT DT 1LD CALl D'I ILL CALl NHAT DT ILD CALl NRAr DT VAhUk 5.617 -999.250 -999.250 126.000 4.871 -999.250 -999.250 5.797 -999.250 -999.250 128.500 7.254 -999.250 -999.250 111.000 6.47J -999.250 -q99.250 122.188 7.617 -999.250 -999.250 117.o00 5.547 -999.250 -999.250 1J4.750 -999.250 -999.250 13].000 4.727 -999.250 -999.250 1~].125 3.2o4 -999.250 -999.250 1~0.~75 2·535 -999.250 -999.250 137.500 ~L~ DRHG NCNb DRHU NCNL DRHU NCNL iLM DRHU NCNb IL~ DRHG NCNL IbM DHHU NCNb NCNb 1 LN DRHU NCNb 1L~ D~HO NCNb DHHO ~CNb NC~L VALUE 5.090 -999.250 -999.250 5.590 -999.250 -999.250 5·438 -999.250 -999.250 7.145 -q99.250 -999.250 6.523 =999.250 -999.250 7.406 -999.250 -999.250 5.191 -999.250 -999.250 4.531 -999.250 -999.250 4.785 -999.250 -999.250 J.313 -999.250 -999.250 2·717 -999.250 -999.250 MNEMONIC SFLU NPHI FCNL SFbU NPM1 FCNb SFbU NPHI fCNL NPHI FCNL SFbO NPH1 FCNL ~FbU NPHi fCNb SFLU NPHI ~CNL 8FLU NPHI FCNL 8FbU NP H I FCNL 8FLU NPHI FCNb SFbU NPHI VALUk 5.234 -999.250 -999.250 4.590 -999.250 -999.250 5.9~5 -999.250 -999·250 7·957 -999.250 -999.250 o.90b -999.250 -999.250 7·88'7 -999.250 -999.250 5.613 -999.250 -999.250 7.074 -999.250 -999.250 5.920 -999.250 -999.250 4.281 -999.250 -999.250 4.508 -999.250 -999.250 30o0.000 2900.000 2~00. 270~.000 2eOo. 006 25e 1. 000 VALUk -184.875 -999. zSO -999.250 -196.375 -q99.250 -999.250 42.~75 -189.b25 -999.250 -999.25{) 57.750 -198.875 -999.250 -999.250 34.156 -14~.250 -999,250 -999.250 83.000 -181.500 -999.250 -999.250 59.969 -54.81 ] -999.250 -999.250 39.750 -954.250 -999.25u -999.250 -g99.25~; ~NEMLJN lC 1bi) CALX NRAI DT igD CALl NRAT DT CALl NRA~ DT iLD CALl NRAT 1LD CALl NRAI DT CALl NRAT D1 ILD CAhl NRAT CALl NRAT DT 2 -99g -999 1 -999 -999 2 -999 -999 137 4 -999 -999 2 -999 -999 134 -ggg -999 2000 -999 -999 100 -999 -999 -ggg -999 .250 .250 .125 .252 .250 .250 .000 .250 .250 .75O .250 .250 .250 .465 .250 .250 .125 .~58 .250 ,250 .000 .000 .250 .250 .563 .250 .250 .250 .250 DRHO ~CNL DR HO [~CNL 1LH DRHO NCNL iLM NCNL ILM D~HO ~CNL D~HU NCNL U~HO NCNk DRHO NCNL VALUE 2.555 -999.250 -999.250 1.416 -999.250 -999.250 2.365 -999.250 -999.250 4.355 -999,250 -999.250 2.295 -999.250 -999.250 2.051 -999.250 -999.250 2000.000 -999,250 -999.250 -999.250 -999.~50 -999.250 MN£MONIC SFbU NPH1 fCmL SFLU NPHI FCNL Sf'LU NPHI fCNb SfbU iqPHI FCNb SFLU NPHI FCNL SFLU NPH1 FCNL S~LO NPHi FCNb S~LU NPHI fCNL VALUk 4.551 -999.250 -999.250 2.420 -999.250 -999.250 4.33b -999.250 -999.250 6.37~ -999.250 -999.250 3.223 -999.250 -999.250 3.758 -999.250 -999.250 1.021 -999.250 -999.250 -999.250 -999.250 -999.250 1024 01 TAPI'. NAMP.,: ~ 10 J2 bF F, V1CL NA~AE: .H l~ ['I IAPC, CUNIlNUATIiJN hi'X1 IAPE ('t~MM~ HO/lO/ 4