Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout181-105PLUGG!_~ & LOCATION CLE CE REPORT
State of Alaska
· ALA~ 0IL & GAS CONSERVATION COHMISSION
Review the well file, amd' cc~mmemt on plugging, well head
s Ua~'as~n and location c~.ara~ce - provide ~o~. clear, code.
Well h~ad ca= of~- "
Harker 'pos= or plats:
--
Loca=ion Clearance:
Conclusions: . _
Code
Signed
STATE OF ALASKA
ALAS IL AND GAS CONSERVATION COM ,.,SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 181-105 300-057
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20628-00
'l'
4. Location of well at surface ~; 9. Unit or Lease Name
2079' 3187' SNL, 607' WEL, SEC. 01, T11N, At At top total NSL, of depth productive 2374' EWL, interval SEC. 12, T11N,R12E' R12E, UM UM ' ~: l'~ ~!~lql~ ~~ 10. Prudhoe Bay Unit Well Number
1821' NSL, 2067' EWL, SEC. 12, T11N, R12E, UM M-17
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 52.13' AMSL ADL 028260
12. Date SPudded10110/1981 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband' 115' Water depth' if °fish°re 116' N°' °f C°mpleti°nsl 1/05/1981 4/15/2000 -' N/A MSL Zero
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set121. Thickness of Permafrost
11944 9575 FTI 11529 9185 FTI r"l Yes [] NoI N/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
GR / SP / DIL / BHCS, HDT, FDC / CNL / GR / CAL, CBL / VDL / CCL / GR, Gyro
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" x 30" Insulated Conductor Surface 110' 36" _~60 sx Arctic Set (Approx.)
13-3/8" 72# L-80 Surface 2728' 17-1/2" ¢000 sx Permafrost II
,
9-5/8" 47# L-80 Surface 10946' 12-1/4" 1566 sx Class 'G', 140 sx PF 'C'
7" 26# L-80 10436' 11932' 8-1/2" ¢38 cu ft Class 'G'
,
~ , ,
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) , '
SiZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 6354'- 10450' 10357'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
~ ~'~ 22 2000 10098' P&A with 54 Bbls Class 'G', Sqzd to 1200 psi
5994' Set 9-5/8" Bridge Plug w/Whipstock on Top
27. PRODUOTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO
TEST PERIOD
I
i~low Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
,
... 28.. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ORIGINAL
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered'
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
BKB Subsea
Sag River 11021' 8698'
Shublik 11055' 8725'
Ivishak 11944' 9523'
~ ". '~i '~
,,, ,, ,, ,,, ~ ,,~ ,. ,,,,,~ ,.~,, ,,,,~ ,,,, . ,,~ ~,, ,, ,, ,,,,
31. List of A~achments: Summa~ of Daily Drilling Repo~s
32. I hereby ce~i~ that the foregoing is true and correct to the best of my knowledge
M-17 181-105 000-057
Prepared By Name/Numbec Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM S: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21 .' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Original Well: M-17 Sidetrack Well: M-17A
Field: Prudhoe Bay Field: Prudhoe Bay
AP I: 50-029-20628-00 APl: 50-029-20628-01
Permit: 181-105, 300-057 Permit: 200-032
PRE-RIG WORK FOR SIDETRACKING OPERATION
04/11/00
Miru SWS Unit ¢Y2150. Well currently S/I. RIH. Shot Chemical Cut at 10455 md, above the XN nipple.
POOH. Unsuccessful cut. Rigged up with second Chemical cutter. Shot chemical cutter at 10450 md,
26' below the X nipple. POOH. Validate successful cut. RDMO.
04/12/00
RIH w/3.5" Cent., TTL and S. Bailer. LOC Tail at 10448' SLM + 2' = 10450' ELM. Tag Fish (TD) at
11673' SLM + 2' = 11675' Corrected. Tree Cap o-ring replaced and tree cap pressure tested.
Summary: Ran 3.5" Cent with TEL to corrected TD of 11675' to check the depth of cut off tailpipe that
fell to bottom.
04/15/00
AOGCC notified of pending P&A operation for sidetrack. Miru Dowell CTU #2 and Sqz Unit. Load hole
with 586 bbls SW while RIH. Tagged and corrected depth to top of fish (cut tailpipe) at 11675'. Mixed
and pumped 54 bbls 15.8 class G cement. Layed in cement from 11675'-9984'. Squeezed with 1200
psi (whp stable). Dropped ball and pumped 20 bbls biozan. Circulated out from 9900' at 80%. FP'd
tubing. Trap 1350 psi on well. RD. After one hour, whp = 1350 psi. MO.
04/16~00
MIRU. RIH w/3.00" swage to 10098' SLM. Tag cement plug. POOH. RDMO. Tree Cap o-ring was
replaced and cap was tested w/well PSI to 1500 PSI. Summary: Ran 3.00" swage to top of cement at
10098' WLM.
Miru SWS Unit #2150. Well currently S/I. RIH. Tie-in to gas mandrel. Shot Chemical Cut at 6350' md.
POOH. Validate successful cut. RDMO.
II
Facility PB M Pad
Progress Report
Well M-17A Page 1
Rig Nabors 9ES Date 30 May 00
Date/Time
29 Apr 00
21:00-06:00
21:00-06:00
30 Apr O0 06:00-00:00
06:00-00:00
01 May 00 00:00
00:00-01:30
00:00-01:30
01:30
01:30-06:00
01:30-03:00
03:00
03:00-04:00
04:00
04:00-06:00
06:00-09:30
06:00-07:30
07:30
07:30-08:00
08:00
08:00-09:00
09:00
09:00-09:30
09:30
09:30-13:30
09:30-13:00
13:00
13:00-13:30
13:30
13:30-21:00
13:30-21:00
21:00
Duration
9hr
9hr
18hr
18hr
1-1/2 hr
1-1/2 hr
4,1/2 hr
1-1/2 hr
lhr
2hr
3-1/2 hr
1-1/2 hr
1/2 hr
lhr
1/2 hr
4hr
3-1/2 hr
1/2 hr
7-1/2 hr
7-1/2 hr
Activity
Move rig
Rig moved 40.00 %
RDMO PM-2. At ice road with Sub & Pits @ 0130 hrs.
Commence moving across ice road. Requires one jump.
Move rig (cont...)
Rig moved 100.00 %
At well location - Slot
Move Rig Off Ice Road @ 0800 hours On M Pad @ 1600
hrs. Spot and level Rig. Spot Pits, workshop and
hook up lines. Raise Derrick. RFLI Top Drive.
Fluid system
Fill pits with Seawater
Completed operations
Take on Seawater and clean up rig. Install
Secondary annulus valve and place boards around cellar and
make safe.
Wellhead work
Rigged up Fluid system
Equipment work completed
R/U Hoses to Tree and monitor well pressures.
Tubing=IA=0 psi. OA= 100 psi.
Retrieved Hanger plug
Equipment work completed
R/U DSM and pull BPV.
Circulated at 6336.0 ft
Circulate out Freeze Protect and circulate bottoms
up.
Wellhead work (cont...)
Circulated at 6336.0 ft
Obtained bottoms up (100% annulus volume)
While circulating bottoms up observe increase in
H2S < 10 ppm. Slow rate to 2-3 BPM keeping levels
below 10 ppm until level at zero- surface to surface
strokes.
Installed Hanger plug
Equipment work completed
Install TWC and test from below to 1000 psi- good.
Rigged down Xmas tree
Equipment work completed
Held safety meeting
Completed operations
Conduct Pre-spud Meeting.
BOP/riser operations - BOP stack
Installed BOP stack
Equipment work completed
Inspect Hanger Threads and check lockdown bolts.
Nipple up BOPE.
Tested BOP stack
Suspended test, surface equipment leaked
Conduct body test on BOP. Observe leak from swage
on 3" choke line at BOP connection.
Repair
Repaired Choke line
Equipment work completed
Facility PB M Pad
Progress Report
Well M-17A Page 2
Rig Nabors 9ES Date 30 May 00
Date/Time
21:00-00:30
21:00-00:30
02 May 00 00:30
00:30-01:30
00:30-01:30
01:30
01:30-06:00
01:30-02:30
02:30
02:30-03:30
03:30
03:30-04:30
04:30
04:30-06:00
06:00-18:30
06:00-14:30
14:30
14:30-18:00
'18:00
18:00-18:30
18:30
18:30-06:00
18:30-21:00
21:00
21:00-02:00
03 May 00 02:00
02:00-03:00
03:00
03:00-05:00
05:00
05:00-06:00
06:00-06:30
06:00-06:30
Duration
3-1/2 hr
3-1/2 hr
lhr
lhr
4-1/2 hr
lhr
lhr
lhr
1-1/2 hr
12-1/2 hr
8-1/2 hr
3-1/2 hr
1/2 hr
11-1/2 hr
2-1/2 hr
5hr
1 hr
2 hr
I hr
1/2 hr
1/2 hr
Activity install same.
BOP/riser operations - BOP stack
Tested BOP stack
Pressure test completed successfully - 3500.000 psi
R/U and test BOPE to 250/3500 psi. AOGCC waived
witness.
Wellhead work
Retrieved Hanger plug
Equipment work completed
R/U DSM and pull TWC. Flowcheck- OK.
Pull Gas lift completion, 4-1/2in O.D.
Retrieved Tubing hanger
Equipment work completed
MFLI Landing joint. BOLDS and pull Hanger to
rigfloor. Up weight 105 klbs.
Circulated at 6336.0 ft
Obtained bottoms up (100% annulus volume)
CBU @ 11 BPM/425 psi. Smal amounts of H2S on
bottoms up- 8-10 ppm.
Rigged up Tubing handling equipment
Equipment work completed
L/D Hanger and Landing Joint. R/U Handling
equipment.
Laid down 1000.0 ft of Tubing
POOH laying down tubing.
Pull Gas lift completion, 4-1/2in O.D. (cont...)
Laid down 6336.0 ft of Tubing
Completed operations
POOH and lay down 208 joints 4.1/2" Tubing, 16.90
ft cut off. 2 x GLM's, 1 x SSSV. Tubes in good
condition- small chips out of boxes on last joints
OOH.Clear rigfloor.
Serviced Block line
Line slipped
PJSM. Slip new spool drilline. Inspect draworks.
Calibrate COM.
Serviced Top drive
Equipment work completed
BHA run no. 1
Made up BHA no. 1
BHA no. 1 made up
Load pipe shed while installing wear ring. Load
BI-IA. MFtJ Cleanout assembly..
Singled in drill pipe to 6354.0 ft
At Top of fish: 6354.0 ft
Single in 5" drillpipe. Tag TOF @ 6,354'. Up weight
180 klbs, down 155 klbs Rot 168 klbs.
Circulated at 6354.0 ft
Obtained bottoms up (100% annulus volume)
CBU @ 12 BPM/850 psi. No H2S Observed.
Pulled out of hole to 400.0 ft
Pulled BHA
BHA run no. 1 (cont...) d~ ~ 2 2000
Pulled BHA
Facility
II
PB M Pad
Progress Report
Well M-17A Page 3
Rig Nabors 9ES Date 30 May 00
Date/Time
06:30
06:30-10:00
06:30-10:00
10:00
10:00-11:00
10:00-11:00
11:00
1 I:00-06:00
11:00-12:30
12:30
12:30-17:00
17:00
17:00-18:00
18:00
18:00-19:30
19:30
19:30-05:00
04 May 00 05:00
05:00-06:00
06:00
06:00-06:30
06:00-06:30
06:30
06:30-10:30
06:30-09:00
09:00
09:00-10:30
10:30
10:30-11:30
10:30-11:30
11:30
11:30-06:00
11:30-13:00
13:00
13:00-14:00
Duration
3-1/2 hr
3-1/2 hr
lhr
lhr
19hr
1-1/2 hr
4-1/2 hr
1 hr
1-1/2 hr
9-1/2 hr
1 hr
1/2 hr
1/2 hr
4 hr
2-1/2 hr
1-1/2 hr
1 hr
1 hr
18-1/2 hr
1-1/2 hr
1 hr
Activity
BHA Stood back
Stand back cleanout mills.
Electric wireline work
Conducted electric cable operations
Completed run with Permanent packer from 5994.0 ft to 5994.0 ft
PJSM. RFU and run 9.5/* bridge plug setting same @
5,994' wireline depth correlating to GR log (
11/6/81). 3 ft above collar.
Perform integrity test
Tested Casing
Pressure test completed successfully - 3000.000 psi
Test Casing to 300/3000 psi for 30 minutes. 4.7
bbls pumped/returned.
BHA run no. 2
Made up BI-IA no. 2
BI-IA no. 2 made up
Make Up Whipstock Assembly and orientate same.
R.I.H. to 5950.0 ft
Stopped: To take survey
Functioned downhole tools at 5996.0 ft
Equipment work completed
Up Weight = 175 klbs, down weight=150
Ubs. Orientate Assembly and set same @ 60 degrees RHS, Obser'
anchor shear @ 20 klbs and Mills shear @ 40 klbs.
Circulated at 5996.0 ft
Hole displaced with Water based mud - 100.00 % displaced
Displace well to 9.8 ppg.
Milled Casing at 6009.0 ft
Completed operations
Mill window and 20 ft new hole. Window from 5,973'
to 5,989'. New hole fl 5,989 to 6,009.
Circulated at 6009.0 ft
CBU @ 480 GPM/1200 psi prior to FIT.
Began precautionary measures
Perform integrity test
Performed formation integrity test
Obtained required level of integrity - 12.5 ppg EMW
Perform FIT @ window to 12.5 ppg EMW. 720 psi/1.3
bbls.
BHA run no. 2
Pulled out of hole to 400.0 ft
At BHA
Pulled BHA
BHA Laid out
Pull BHA. Inspect Mills- in gauge.
5in. Drillpipe workstring run
Circulated at 30.0 ft
Hole displaced with Water based mud - 500.00 % displaced
Function BOPE. Flush stack with jetting tool.
BHA mn no. 3
Made up BHA no. 3
BHA no. 3 made up
Make up and orientate Kick off BHA.
Downloaded MWD tool
Facility
PB M Pad
Progress Report
Well M-17A Page 4
Rig Nabors 9ES Date 30 May 00
Date/Time
14:00
14:00-15:00
15:00
15:00-15:30
15:30
15:30-20:30
20:30
20:30-22:00
22:00
22:00-06:00
05 May 00 06:00-06:00
06:00-16:30
16:30
16:30-17:30
17:30
17:30-18:15
18:15
18:15-19:00
19:00
19:00-06:00
19:00-06:00
06 May 00 06:00-03:30
06:00-15:00
15:00
15:00-16:00
16:00
16:00-16:30
16:30
Duration
lhr
1/2 hr
5hr
1-1/2 hr
8hr
24hr
10-1/2 hr
lhr
3/4 hr
3/4 hr
llhr
llhr
21-1/2 hr
9 hr
1 hr
1/2 hr
Activity
Completed operations
Install Nuclear Sources into LWD tools.
Serviced Drillfloor / Derrick
Equipment work completed
Inspect all rigfloor cables, manfiders and stabbing
board.
Made up BHA no. 3
B HA no. 3 made up
R.I.H. to 5950.0 ft
At Window: 5950.0 ft
Washed to 6009.0 ft
On bottom
Orientate assembly and with pumps off run past
ramp. Wash/ream to bottom.
Drilled to 6375.0 ft
Sidetrack well and drill ahead 8.1/2" hole to
6,375'. No drag, no losses.
BHA run no. 3 (cont...)
Drilled to 7012.0 ft
Started scheduled wiper trip: due to Footage drilled
Directionally Drill 8.1/2" hole. Some drag on
connection. Pump hi-vis sweeps every 4 hours or 300 ft-
whichever sooner- hole cleans up. No losses.
CircUlated at 7012.0 ft
Hole swept with slug - 100.00 % hole volume
Sweep hole clean while rotating pipe @ 80 RPM.
Pulled out of hole to 5974.0 ft
At top of check trip interval
POOH- Hole clean. Some drag ( 15 klbs) pulling BHA
thru window.
R.I.H. to 7012.0 ft
On bottom
RIH- no problems. Wash down last stand -
precautionary.
Drilled to 7735.0 ft
Directionally Drill 8.1/2" hole f/7012' to 7735'
pumping sweeps every 4 hrs/300 ft. No drag/No
losses.
Drilled to 7735.0 ft
Continue drilling from 7735' pumping sweeps every
300'. Sweeps effective, however no excess loading
or drag.
BHA run no. 3 (cont...)
Drilled to 8237.0 ft (cont...)
Continue drilling from 7735' pumping sweeps every
300'. Sweeps effective, however no excess loading
or drag.
Reached planned end of run - Maximum hours on bit
Circulated at 8237.0 ft
CBU, rotating & reciprocating pipe with sweep.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 6828.0 ft
light drag (15K).
Began precautionary measures
A a_ ka ared
rvices
rilling
To:
From:
Subject:
Reference:
BP Exploration / ARCO Alaska Inc.
Blair Wondzell - AOGCC Date: March 1, 2000
William Isaacson
M-17 Application for Sundry Permit - P&A for Sidetrack Operations
APl #50-029-20628
Well M-17 is currently shut-in due to high watercut and is believed to be in communication with a nearby
conductive fault. The well is planned to be sidetracked to a new bottom hole location as a vertical producer
targeting an oil accumulation in western U-pad. The sidetrack is currently scheduled for Nabors 7ES
beginning around April 1st. The pre-rig work for this sidetrack is planned to begin as soon,a~ ~~~
Application for Sundry is approved. ~?:'~~ ~ ~, :~~i.-" i~ ~' ~ ~?~ ~.
Pre-Riq Work:
* Notify the field AOGCC representative with intent to plug and aban~arage
1. RU E-line. Cut the 4Y~" L-80 tubing tail immediately above Magna Range BP set in the first full joint of
tubing above the wireline entry guide. Allow tubing tail to fall to top of fill (fill last tagged at 11,710' ELM).
NOTE: The type of cutter to be used is at the discretion of the Wells Group.
2. RU slickline and drift / tag as required to verify tubing tail has dropped and to determine approximate top
of fill for upcoming cement P&A.
3. RIH with CTU and perform a cement P&A using 15.8 ppg class 'G' cement with adequate cement
volume to fill the 7" liner from top of fill / junk to a minimum of 100' above the top perforation at 11,011'
MD, plus squeeze 5 bbls to the perforations. Estimated minimum cement volume needed is 36 barrels
and aggregate can be used as required to aid in plugging perfs.
NOTE: Top of cement must be at a minimum of 10,911' for AOGCC compliance. Top Of cement
may extend up and into the tubing tail as long as it does not interfere with the upcoming tubing
cutting operations. ~P\~ ~,,
4. Rig up slickline, tag and document top of cement and drift tubing for upcoming tubing cut.
5. Liquid pack the 9-5/8" x 4-1/2" annulus to surface. Test the integrity of the cement plug and 9-5/8"
casing by simultaneously pressure testing both the tubing and 9-5/8" annulus to 3000 psi for 30 minutes
(tubing has a GLV stuck in GLM #1 at 9828'). Increase tubing pressure prior to the 9-5/8" annulus
to avoid possibility of tubing collapse.
NOTE: This step should be done prior to the tubing cut to allow additional trouble-shooting if
either the cement plug or 9-5/8" casing is leaking.
6. RU E-line. Cut the 4 ½" L-80 tubing at approximately 6200' MD using a chemical cutter. This cut will
not be fished, however avoid cutting a tubing collar. Displace the well to clean seawater by
circulating down tubing through the tubing cut. Continue to circulate until clean seawater returns to
surface. Freeze protect top 2200' MD with diesel.
7. Test the McEvoy 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes.
8. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000
psi. Secure well.
9. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation
cost on the handover form.
Ri.q Operations:
1. MIRU Nabors 7ES.
2. Circulate out freeze protection and displace well to seawater. Set TWC.
3. Nipple down tree. Nipple up and test BOPE.
4. Pull and lay down 4-1/2" tubing from E-line cut and above.
5. RU E-line and make GR/JB run to top of tubing cut. Set BP on E-line at -5894' MD (set as needed to
avoid cutting casing collar).
6. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock as desired and set on
tubing stub. Mill window in 9-5/8" casing at -5870' MD. POOH.
7. Kick-off and drill the 8-1/2" intermediate section to Top Sag @ +_12,917' MD (8838' TVD).
8. Run and cement a 7", 26# intermediate drilling liner.
9. Make up and RIH with a 6-1/8" directional assembly to the landing collar.
10. Test the 9-5/8" casing and 7" liner from the landing collar to surface to 3000 psi for 30 minutes.
11. Drill the 6-1/8" production section as per directional plan to an estimated TD of 13,316' MD (9087' TVD).
12. Run and cement a 4 Y2", 12.6# solid production liner throughout the 6-1/8" wellbore.
13. Test the 4-1/2", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 3000 psi for 30 minutes.
Displace well to clean seawater above liner top. POOH LD DP.
14. Run 4-1/2", 12.6# 13Cr-80 New Vam completion tying into the 4-1/2" liner top.
15. Set packer and test the tubing to 3500 psi and annulus to 3000 psi for 30 minutes.
16. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
17. Freeze protect the well to -2200' and secure the well.
18. Rig down and move off.
Estimated Pre-rig Start Date: 03/15/00
Estimated Spud Date: 04/01/00
William Isaacson
Operations Drilling Engineer
564-5521
STATE OF ALASKA ~,.'i
ALA . OIL AND GAS CONSERVATION C ~ilSSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon. [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface ,/' ,/ ,/'
3187' SNL, 607' WEL, SEC. 01, T11N, R12E, UM
At top of productive interval
2079' NSL, 2374' EWL, SEC. 12, T11N, R12E, UM
At effective depth
1911' NSL, 2176' EWL, SEC. 12, T11N, R12E, UM
At total depth
1821' NSL, 2067' EWL, SEC. 12, T11N, R12E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 52.13' AMSL
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
M-17
9. Permit Number
10. APl Number
50- 029-20628-00~
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
11944 feet
9575 feet'/
11529 feet
9185 feet
Plugs (measured)
Junk (measured)
Bridge Plug at 10486' (09/92)
FiI, at 11529I (04/89)0RIGIN~L
Length Size Cemented M D TVD
110' 20" x 30" 260 sx Arctic Set (Approx.) 110' 110'
2699' 13-3/8" 4000 sx Permafrost II 2728' 2700'
10920' 9-5/8" 1566 sx Class 'g', 140 sx PF 'C' 10946' 8691'
1496' 7" 365 sx Class 'G' 10436' - 11932' 8308' - 9563'
Perforation depth: measured
11011' - 11054 (Sag River)
11160' - 11180', 11188' - 11226', 11236' - 11280' (Ivishak)
ED
true vertical subsea 8691' - 8725' (Sag River)
8863' - 8964' (Three Ivishak Intervals)
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10357' with 4-1/2" tailpipe to 1052D~'~?~.~. ~';'~,,,~ ~2,~ u~o,'~'*~"'"' C~,~$~v~
Anchorage
Packers and SSSV (type and measured depth) 9-5/8" BeT PBR packer at 10357'; 4-1/2" SSSV LN at 2093'
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch
14. Estimated date for commencing operati°~,, 115. Status of well classifications as:
March 9, 2000 '~'~, I ..........
, '- ! Eg u, U ~as U ~uspenaea
16. If proposal was verbally approved J
Service
!
Name of approver ,~f Date Approved J
contact Engineer Name/Number: Bi//Is??cson, 564'5521 Prepared By Name/Number: Terrie Hubble; 564'4628
17. I hereby certify thaLthe forg~jding is true a,l~ correct to the best of my knowledge
Signed .... ~ ~ _/~,,/ ,/(/~ Title Senior Drilling Engineer Date ~. ? ~(.-)
Conditions of Approval: Notify Commiss[~ so representative may witness Approval No~ ~) -,"~)..~ %,
Plug integrity m~. BOP Test ~ Location clearance ,,,
Mechanical Integrity Test~ Subsequent form required lo-
ORIGINAL SIGN'ED BY ~ "~.~a~'O,~.- Commissioner
Approved by order of the Commission Robe. t ~d Chdstcnson
Form 10-403 Rev. 06/15/88 '" .,,~"~ ~,-~" Submit In Triplicate
( M-17 Current Status t
WELLHEAD: McELVOY BF. ELEV = 28.08
ACTUATOR:
SSSV LANDING NIPPLE I 2093
13-3/8", 72 #/ft, ~ OTIS BVN (4.562" ID)
· .T.S _ !
I I ~ i~ eAS UFT MANDRELS
I
2726
,~ it' ~AMC:.f3 W/RI<' I AT. H3
·
17 3042 2991
KOP:1600' i ~6. 5630 4877
MAX ANGLE:46 @ I 5 7144 5936
5880' ~ I 4 18o65 6594
It 3 ;8708 7065
2 19270 7465
4-1/2", 12.6#/ft, L- I 9828 ! 7866
,80,AB MOD BUTT
'IPC TUB. I
I CAPACITY: 0.0152 BBL/FT ; ~ "'
NLS MAGNA-RANGE BRIDGE PLUG ( 3.75 "MIN. ID)
SET AT 10486' ELMD IN TBG TAIL ~
ON 9-09-92 ( 5' ABOVE TBG TAIL )J~ , .....
[~ -- 9-5/8" PACKER I 10357
4 1/2", 12.6 #/fi, k-80
lOP
OF
I
~0434
!
!
711 II
UNER I I 4-1/2""XN"N~PPLEI
(OTIS) (3.725" ~D) ~ 10481
' ' 4-1/2" TBG TA~L~1 ~ 05~ 9 /
l
k-80, BTRS
MARKER JOINT I 11161 ]
PERFORATION SUMMARY
REF: LOG:
SIZE SPF I INTERVAL £'PEN/SQZ'D
3-3/8 6 11011-11054 open(4-28-89)
2-7/8 4 11160-11180 open(6-1-86)
2-7/8 4 11188-11226 open(6-1-86)
2-7/8 4 11236-11280 open(6-1-86) _------
7" 26 #/ft, L-80, BTRS ~ --
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
COMPLETION WELL:
8/16/91 REVISED APl NO: 50-029-
SEC I TN ; RGE
9-09-92 G.M. SET BRIDGE PLUG IN TBG TAIL
3-1-99 RWL REVISED TO PC BP Exploration (Alaska)
i iiii i
GAS LIFT MANDRELS
I'~AMC:.f') W/RI( I AT~H~
7 3042 2991
6 5630 4877
5 7144 5936
4 8065 6594
3 8708 7065
2 9270 7465
1 9828 7866
,,,
TREE: McELVOY
WELLHEAD: McELVOY
ACTUATOR:
13-3/8", 72 #/ft,
L-80, BTRS
FOC
Cut 4-1/2" Tubing at -6,200' MD
J4-1/2", 12.6#/ft,L-
80,AB MOD BUTT
'IPC TUB.
CAPACITY: 0.0152 BBL/FT
TOPOF I10434
7"
LINER
9-5/8", 47#/ft, [10945
L-80, BTRS
PERFORATION SUMMARY
REF: LOG:
INTERVAL
11011-11054
11160-11180
11188-11226
11236-11280
PEN/SQZ'D
open(4-28-89)
open(6-1-86)
open(6-1-86)
open(6-1-86)
Proposed
Pre-R
KB. ELEV = 52.13
BF. ELEV = 28.08
SSSV LANDING NIPPLE i
OTIS BVN (4.562" ID) 2093
GAS LIFT MANDRELS
~.AM~.C) WIRY I AT~..H)
KI~ f~Ar3l~l~'~ "rwr3e¢i
7 3042 2991
6 5630 48~
5 71~ 5936
4 8065 6594
3 8708 7065
2 9270 7465
1 9828 7866
SLIDING SLEEVE 110302
( 3.75 "MIN. ID)
9-5/8" PACKER 1103571
4 1/2", 12.6 #/ft, L-80
TAILPIPE
OTIS (3.813" ID)
4-1/2" "XN"NIPPLE
(OTIS) ( 3.725" ID)
4-1/2" TBG TAIL
(ELMD)
10481
10519
10491
Minimum Top of Cement at -10,911' MD
Tubing Tail with Magna Range BP cut and
to top of fill.
Top of Fill tagged at -11,710' MD (9/2/92)
PBTD 111889 I~
7" 26 #/ft, L-80, BTRS ~ ~
DATE REV. BY
I
8/16/91 I
9-09-92 I G.M
3-1-00 WSI
COMMENTS
COMPLETION
REVISED
SET BRIDGE PLUG IN TBG TAIL
Proposed Pre-Rig Work
PRUDHOE BAY UNIT
WELL:
APl NO: 50-029-20628
SEC ~TN ~RGE
BP Exploration (Alaska)
M-17A Proposed Completion
WELLHEAD: 13 5/8"- 5M McEvoy SSH
4-1/2" 'X' Landing Nipple with 3.813' seal bore.
Cellar Elevation = 26.74'
Base Flange = 28.08'
Nabors 7ES RKB = 56.74'
13-3/8", 72 #/ft, L80, BTC I' 2726'
Window Milled from Whipstock
Top of Window at +/-5870' MD
Bridge Plug set at +/-5894' MD
J +/-5720' I BAKER 7" x 9-5/8' Tie Back Sleeve
ZXP Liner Top Packer
'HMC, Hydraulic Liner Hanger
4-1/2" 12.6# 13Cr-80, New VamTubing with G LM's
GAS LIFT MANDRELS
IVD Size Valve Type
1 TBD 1-1/2" RP Shear
2 " 1 - 1/2" D V
3 " 1" DV
4 " 1" DV
5 " 1" DV.
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
7" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve.
,~ +/-12~770' J BAKER 5" x 7" Tie Back Sleeve
ZXP Liner Top Packer
'HMC' Hydraulic Liner Hanger
9-5/8", 47 #/ft, LB0, BTC
J +/-12,917' J
7", 26 #/ft, L-80, BTC-Mod
4-1/2" 12.6 #/ft, L-80, BTC-Mod
Plug Back Depth
I+F13,316' I
1+~13,270' I
Date Rev By Comments
..... PRUDHOE BAY UNIT
03/01/00 WSI Proposed Completion WELL: M-17A
APl NO: 50-029-20628-01
Shared Services Drilling
II I I
A'D!;~,,A OIL AND GAS CONSERVATION COMMISS.,,,, ;;~' (./'~
REPORT OF SUNDRY WELL OPERATIONS
× P r--(~'
1. Operations performed: Operation shutdown Stimulate Plugging erfo ate .....
Pull tubing Alter casing ..... Repair well Other
6. Datum elevation (DF or KB) <
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3187' SNL, 607' WEL, SEC. 01, T11N, R12E, UPM
At top of productive interval
2079' NSL, 2374' EWL, SEC. 12, T11N, R12E, UPM
At effective depth
1911'NSL, 2176' EWL, SEC. 12, T11N, R12E, UPM
At total depth
1821' NSL, 2067' EWL, SEC. 12, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 11944 feet
true vertical BKB 9575 feet
5. Type of Well:
Development X KBE = 52.13 AMSL feet
Exploratory
Stratigraphic .... 7. Unit or Property name
Service Prudhoe Bay Unit
8. Well number
M-17 (23-12-11-12) PBU
9. Permit number/approval number
o
81-~/ ~ ~
10. APl number°~ '
50- 029-20628
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11529 feet
true vertical BKB 9185 feet
Junk (measured) fill at 11529' MD (04/89)
Casing Length Size
Structural --
Conductor 100 20x30
Surface 2704 13 3/8
Intermediate 10922 9 5/8
Production --
Liner 1496 7
Perforation depth:
Cemented Measured depth True vertical depth
BKB
8 c.y. 134 134
3804 c.f. 2728 2700
1930 c. f. 10946 8691
438 c.f. 10436-11932 8308-9563
measured 11011'-11054' (Sag R)
11160'- 11180', 11188'-11226', 11236'-11280' (Ivishak)
true vertical subsea 8691'-8725' (Sag R)
8863' - 8964' (three Ivishak intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10357' with 4 1/2" tailpipe to 10518'
Packers and SSSV (type and measured depth) 9 5/8" BOT PBR/pkr. at 10357'; 4 1/2" SSSV at 2092'
D ~'/"1~ !~/~ ~
13. Stimulation or cement squeeze summary See Attachment
I\L~LI V LLJ
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Reoresentative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas__ Suspended ,,
17. I hereby certify that the foregoi, p,g is true and correct to the best of my knowledge.
Signed . Title Senior Technical Assistant I
Form 10-40z[ Rev 06/15/88 T
Service,
Tubing Pressure
Date ,~//~//~;' ]
SUBMIT IN D,U'PLIfDATE ~F;
5117/92
WELL M-17(23-12-11-12)
ACID Stimulation,Operation
Performed a HCL using the following fluids below:
300 bbls SeaWater
17.8 bbls 15% HCL ACID with 3 gal A260, 4 gal w-54, 15 lbs 158
13 bbls METHANOL
fjh
5/11/93
6 1 I 1995
Gas Cons,
Anchorag~
TO:
THRU:
M E M ORA
~SKA OI
Lonnie C. Sm~~
Commissioner~ / ~
stale of Alaska
GAS CONSERVATION COMMISSION
~DATE: May 16, 1991
HH516-5
FILE NO:
TELEPHONE NO:
SUBJECT:
RIG/BOPE Inspection
BPX PBU M-17
Prudhoe oil Pool
FROM:
Harold R. Hawkins
Petroleum Inspector
Saturday MaY 1.1 1991: I performed a RIG/BOPE inspection on
Nabors rig 3-S on 3/28/91. I found several infractions and
this was a follow up. Ail the infractions I could find were
corrected except for one. The fire guard to put on the
control lines has not been performed yet, but is on
location.
In summary: The RIG/BOPE inspection was satisfactorily
performed with the exception of the fire guard material to
go on the control lines. Richard Larken, the toolpusher,
said this would be performed by next rig move.
02-00lA (Rev. 6/89)
20/11/MEMO 1. PM3
STATE OF ALASKA
ALASKA 01L AND GAS C0NSERVAT i ON COMM I SSI ON
DOPE Walk-Thru Inspection Report
. UlC
OPERATION:.. grlg Wkvr 'P//ermit# /-~///~1- DATE: ~'"////,~/
Location:Se~'Z~ T/.~/ R/,~zC U / Well name ~=7~_ '
Drlg contr ~A ~ ~ ~,~ Rig~ ~ -~ Representative ~]~/~ ~]()~ .
Location (gen'l) ~/f~ Well sign ~/~
i N ~O~PL I ANCE ~ I N CO~PL I ANCE ~
~es n~ ntb A. DIVERTER ~es n~ gl8
( ) (~) line sz & length 1~. ~) ( ) ( ) f~e~11
( ) ( ) b~fu~a~ed & d~n ~ind 1~. ~) ( ) ( ) aond~on (le~ks~ hoses~ e~o)
1. ( )
3.()
~.()
S.()
6.()
7.()
~- (X)
3. (×)
7. (~)
8. (X)
9. (~)
10. (/~
11. (X)
12. (X)
~3.
.)~ls. ( )
(y,)
3. (X)
s. (×)
6. (~
7.(~
8.(X)
9.
()
()
()
()
( ) 90° targeted turns
( ) vlvs: auto & simultaneous
( ) annul ar pack-off
( ) condition
B. BOP STACK
( ) ( ) wellhead flg wkg press
( ) ( ) stack wkg press
( ) ( ) annular preventer
( ) ( ) pipe rams
( ) ( ) blind rams
( ) ( ) stack anchored
( ) ( ) chke/kill line sz .
( ) ( ) 90° turns targeted (chke & kill ln)
( ) ( ) HCR vlvs (chke & kill)
( ) ( ) manual vlvs (chke & kill)
( ) ( ) connections (flgd, whd, clmpd)
( ) ( ) drl spool
( ) ( ) flow nipple
( ) ( ) flow monitor
control lines fire prOtected
C. CLOSING UNITS
wkg press
( ) ( ) fluid level
( ) ( ) oprtg press
( ) ( ) press gauges
( ) ( ) sufficient vlvs
( ) ( ) regulator bypass
( ) ( ) 4-way vlvs (actuators)
( ) ( ) blind handle cover
( ) ( ) driller control panel
1.(k) ()
2.(X) ()
3.(X) ()
4.() ()
5.~) ()
6. O0 ()
7. (X) ( )
8. (X) ( )
1. (~) ( )
2. (~) ( )
3. (X) ( )
4.(k) ()
5.() ()
6. (~) ()
D. MUD SYSTEM
( ) pit level floats installed
( ) flow rate sensors
( ) mud gas separator
00 degasser
( ) separator bypass
( ) gas sensor
( ) chke In conn
( ) trip tank
E. RIG FLOOR
( ) kelly cocks (upper~lower,IBOP)
( ) floor vlvs (dart vlv, ball vlv)
( ) kelly & floor vlv wrenches
( ) driller's console (flow monitor~
flow rate indicator, pit level
indicatorss gauges)
(~(~ kill sheet up-to-date
( ) gas ~etection monitors
(H S & methane)
7. ~V~) ( ) ( ) hydr chke panel
8. (~,) ( ) ( ) chke manifold
F. MISC EQUIPMENT
1. 0~) ( ) ( ) flare/vent line
2. 0[) ( ) ( ) 90° turns targeted
3.~)) ()
4. ()
s.. O()
6. (y,) ()
(dwn strm choke lns)
( ) reserve pit tankage
( ) personnel protective equip avail
( ) all drl site suprvs trained
2for procedures
( ) H S probes
10. (~x! ( ) ( ) remote control panel 7. (~) ( ) ( ) rig housekeeping
Da:e of last BOP inspection: ' Date of las~ BOP
Non-compliances no~ corrected & why= ~ ~~ A~~~7~ ~[~EJ~r~/JJ(~~ ~l~ ~~/~
BOP ~es~ & results properly entered on da~l~ ~eco~d? ~-~ K~11 shee~ current?
/ ·
C.0013 (rev 03/29/91)
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :10/10/90
T#:81737
FROM: Information Control
Well Records LR2-1
SUBJECT: BP CASED HOLE FINALS
·:
·
·
Enclosed is your copy of the material listed below. If you have any qUestions, please contact BP
Well Records at (907) 564-4445.
M-17 TDT-P-Borax Log 10/06/90 #1 10850-11504 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
OCT 1 9 1990
AI~ 0tl & (~as Co~s. Commissi~
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 10/23/89
Transmittal: 80517
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS'
Enclosed is your copy of the mater, iai listed below. If you have any
questions, please contact BP Well Ree6rds at (907) 564-4445.
M-17 PROD-F 10/16/89 $1 10900-11440 SCH 5"
R-10 COMP 10/17/89 #1 9350-10830 SCH 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
ARCHIVES
BP EXPLORATION
To: Distribution
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: 10/23/89
Transmittal: 80515
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
A-14 TEMP 10/05/89 91 500-8940 Camco
C-19 FM/TEMP 10/07/89 91 11100-11450 Camco
C-31 FM/TEMP 10/06/89 41 11400-11665 Camco
J-02 PROD 10/06/89 41 9900-10210 Camco
J-07 PITS 10/04/89 41 11150-11450 Camco
J-15 PROD/TEMP 10/06/89 ~1 11000-11580 Camco
M-12 MISC GAS 10/05/89 ~1 9750-10000 Camco
M-17 GAS LIFT 10/06/89 91 SURFACE-9370 Camco 1"/5"
R-10 LEAK DET. 09/30/89 91 180-9'650 Camco 2"/5"
X-01 PROD 10/03/89 41 7850-9350 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
RESERVOIR
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc. -
900 East Benson Boulevard
P.O. Box 196612 -
Anct~orage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 10/20/89
Transmittal: 80513
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
,_
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
G-06 CCL 10/17/89 %1' 8050-9601 Atlas 5"
B-24 CCL/PERF 10/14/89 %1 9700-10670 Sch
M-I7 PRES/TEMP 10/13/89 %1 30-11460 Sch 1"/5"
R-10 LEAK DET. 10/13/89 ~1 10--10600 Sch
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
ARCHIVES
Gas {30ns.
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
From:
Subject:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL LOGS
Date: 08-AUG-89
Transmittal: 80242
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907)564-4445.
G-14 TEMP 06/08/89 91 9250-9700 ELS
M-17 TEMP/SPIN 05/09/89 91 10900-11400 HLS 5"
G-14 SPINNER 06/08/89 ~1 9250-9702 HLS
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
o
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
June 9, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
B. J. Policky
Supervisor Waterflood & ~4iscible Flood
BJP:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
RECEIVED
Alaska 0il & Gas Cons. Commission
Anchorage
1. Operations performed: Operation shutdown
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3187' SNL, 607' WEL, SEC. 01, T11N, R12E, UPM
At top of productive interval
2079' NSL, 2374'EWL, SEC. 12, T11N, R12E, UPM
At effective depth
1911'NSL, 2176'EWL, SEC. 12, T11N, R12E, UPM
At total depth
1821' NSL, 2067, EWL, SEC. 12, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 11944 feet
true vertical BKB 9575feet
STATE OF ALASKA
KA OIL AND GAS CONSERVATION COM N
REPORT OF SUNDRY WELL OPERATIONS
Stimulate Plugging
Repair well
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
Perforate X
Other
6. Datum elevation (DF or KB)
KBE = 52.13 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
M-17 (23-12-11-12) PBU
9. Permit number/approval number
81-150/9-090
10. APl number
5O- O29-20628
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11529feet
true vertical BKB 9185'feet
Junk (measured) fill at 11529' MD (04/89)
Casing Length Size
Structural --
Conductor 100 20x30
Surface 2704 13 3/8
Intermediate 10922 9 5/8
Production --
Liner 1496 7
Perforation depth:
Tubing (size, grade, and measured depth)
Cemented Measured depth
8 c.y. 134
3804 c.f. 2728
1930 c.f. 10946
438 c.f. 10436-11932
measured 11011'-11054' (1S1%~,!
11160'-11180', 11226', 11236'-11280' (Ivishak)
true vertical subsea 8691'-8725' (Sag R)
8863'. 8964' (three IVishak ~ntervals)
4 1/2" L-80 to 10357' with 4 1/2" tailpipe to 10518'
True vertical depth
BKB
134
270O
8691
8308-9563
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
95/8"BOTPBR/pkr. at 10357~ 4 1/2"SSSVat209~ E ~ E ~ V E D
! 3
& Gas Cons. Commission
Anchorage
14.
Reoresentative Daily Average Production or In!ection Dat~
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 240 145 1273 1479
256
Subsequent to operation
2640 7831 3183 1753
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas Suspended
17. I hereby ce~,~/that th~r~/g/~ tr~ and correct to the best of my knowledge.
Signed
Form 10-404 Rev 06/'1'5/88
Service
Title Supervisor Watedlood/Miscible Flood
338
SUBMIT IN DUPLICATE
WELL M-17 (23-12-11-12~ PBU
ADDtL. PERFORATION OPERATIONS
The following Sag R. interval was perforated April 18, 1989 using Dresser Atlas 3 3/8"
carrier guns at 6 spf:
11011' - 11054' MD BKB (Ref. BHCS, 11/6/81)
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to prodction immediately following perforating operations, then tested.
jm
5/11/89
RECEtVED
Alaska 011 g Gas Cons. Commission
Anchorage
BP EXPLORATION
ROUSTON
ARCO
CHEVRON
EXXON
TEXA~0
MOBIL
PHILLIPS
STATE 0FALAS~
GEOSCIMNCES
RESERVOIR
,,,
,.
REFERENCE: ARC'S~'V'~S
·
BP'CASED MOLE FINAL LOGS
BP Exploration (Alaska) In=
900 East Benson Bouleva~l
RO. Box 196612
Anchom§e. Alaska 99519~612
(907) 561-5111
Da,e:, 05-02-89
td: 80024
The roi lowing material ls being submitted herewith. PleaSe acknowledge receipt by
signing a copy of this letter and returning It to this office:
F-02 CCL 04-29-89 #i 84.50-10769 Atlas 5"
M-17 ~CL 04-28-89 #1 10900-11300 Atlas 5"'
X-12 CCL 04-27-89 #1 8900-9631 Atlas 5"
Received Shirley R. McCurry
· I NFORMAT i ON CON~
Date
Wei i Records L~-I
BP EXPLORATION
EOUSTON
ARCO
EX~0N
'TO:
MOBIL
PHILLIS
~TATE
ARCHIVES
I NOEXED
BP ExplomMon (Alaska) Inc.
900 East Sanson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(~)7) 561-5111
Date:
04-26-89
80011
T~:
, ,,
REFERENCE:
BP FINAL DATA - PRESSURE SURVL~ DATA
The following material Is being submi,~'ed herewith. Please acknowledge receipt by
signing a copy of this .let~rer and ret~'ning It to this office:
B-23 S~atic Gradient 04-20-89 Camco
D-17 Static Gradient 04-18-89 Camco
D-26 Static Gradient 04-22?89 Camco
E-03 Static Gradient 04-16-89 Camco
F-Il Static Gradient 04-20-89 Camco
H-24 Flowing Gradient 04-19-89 Camco
K-05 Static Gradient 04-18-89 Camco
M-17 Static. Gradient 04-20-89 Camco
S-18 : Static Gradient 04-16-89 Camco
X-19 Static Gradient 04-20-89 Camco
Z-25 Static Gradient 04-16-89 Camco
Z-31 Static Gradient 04-21-89 Camco
Received
Date
Shirley R. McCurry
I NFORMAT ~ ON CONTROL
We I I Records LR2-1
BP EXPLORATION
March 20, 1989
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO, Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of stimulating the well.
Yours very truly,
J. A. Bragg
Manager Production Engineering
JAB:JAM
Enclosures (4)
cc:
L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
REC IV, ED
STATE OF ALASKA
· KA OIL AND GAS CONSERVATION COMMI N
REPORT OF SUNDRY WELL OPERATIONS
Stimulate x Plugging._. Perforate
...... Repair well
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
1. Operations performed: Operation shutdown
Pull tubing Alter casing ...
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3187' SNL, 607' WEL, SEC. 01, T11N, R12E, UPM
At top of productive interval
2079'NS1., 2374' EWL, SEC. 12, T11N, R12E, UPM
At effective depth
1857' NSL, 2109' EWL, SEC. 12, T11N, R12E, UPM
At total depth
1821'NSL, 2067' EWL, SEC. 12, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 11944feet
true vertical BKB 9575feet
Other
6. Datum elevation (DF or ~'B)
KBE = 52.13 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
M-17 (23-12.11-12) PBU
9. Permit number/approval number
81-150/7.337
10. APl number
50- 029-20628
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11762feet
true vertical BKB 9402feet
Junk (measured) fill at 11762' WLM (08/88)
Casing Length Size
Structural --
Conductor 100 20x30
Surface 2704 13 3/8
Intermediate 10922 9 5/8
Production --
Liner 1496
Perforation depth: measured
Cemented Measured depth
8 c.y. 134
3804 Cof. 2728
1930 c.f. 10946
7 438c. f.
11160'-11180°, 11188'-11226', 11236'-11280'
10436-11932
True vertical depth
BKB
134
270O
8691
8308-9563
true vertical subsea
8863' - 8964' (three intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10357' with 4 1/2" taiipipe to 10518'
Packers and SSSV (type and measured depth) 95/8"BOTPBR/pkr. at 10357~ 4 1/2" SSS V at 2092'
13. Stimulation or cement squeeze summary
14.
see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Reoresentative Daily Averaae Production or Iniection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 160 92
Subsequent~operation
238 1418 250
Form 10-40,4' Rev 06/15/88
240 145 1273 1479 256
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas . Suspended Service
17. I hereby ce~ify t~at the fo.~ing i~ true and correct to the best of my knowledge.
Signed Title Manager Production En~ineering. Date
/SUBMIT IN DUPLICATE
WELL M.17 (23.12.11.12~ PBU
STIMULATION OPERATIONS
A half-strength mud acid wash was performed March 9, 1989, on the following
perforated intervals in Well M-17.
11160' - 11180' MD BKB
11188' - 11226' MD BKB
11236' - 11280' MD BKB
Thc trcatmcnt was bullhcadcd as follows:'
a)
b)
c)
d)
120 bbls. 115% HCI/10% xylcne
31515 bbls. 6% HC1 - 1.15% HF
120 bbls. 2% NH4CI brine
120 bbls. 2% NH4CI brine w/mutual solvent
The well was returned immediately to production and tested.
jm
3/17/89
Standard Alaska
Production Company ~
900 East Benson Bou eva~
P.O. Box 196612
Anchorage, Alaska '99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
January 30, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
BJP:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
Yours very truly,
B. J. F~licky, S~pervisor
/
Waterflood & Miscible Flood
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
1. Type of Request:
A~L~ STATE OF ALASKA ~i,
,..,KA OIL AND GAS CONSERVATION COMMI .~N
APPLICATION FOR SUNDRY APPROVALS
Abandon Suspend Operation Shutdown ~ Re-enter suspended well
Alter casing"' Repair well~ Plugging Time extension ~ Stimulate
Change approved program Pull tubing Variance ~ Perforate .,, X, Other .
5. Type of Well:
Development x
Exploratory ~
Stratigraphic ~
Service
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519.6612
4. Location of well at surface
3187' SNL, 607' WEL, SEC. 01, T11N, R12E, UPM
At top of productive interval
2079' NSL, 2374' EWL, SEC. 12, T11N, R12E, UPM
At effective depth
1857' NSL, 2109' EWL, SEC. 12, T11N, R12E, UPM
At total depth
1821' NSL, 2067' EWL, SEC. 12, T11N, R12E, UPM
12. Present well condition summary
Total depth: measured 11944 feet
true vertiCal BKB 9575 feet
6. Datum elevation (DF or KB)
KBE = 52.13 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
M-17 (23-12-11-12) PBU
9. Permit number
81-150
10. APInumber
50- 029-20628
11. Field/Pool
PrudhoeOilPool
Plugs (measured)
Effective depth: measured 11762 feet
true vertical BKB 9402 feet
Junk (measured) fill at 11762' WLM (08/88)
Casing Length Size Cemented Measured depth True vertical depth
Structural -- BKB
Conductor 100 20x30 8 c.y. 134 134
Surface 2704 13 3/8 3804 c.f. 2728 2700
Intermediate 10922 9 5/8 1930 c.f. 10946 8691
Production --
Liner 1496 7 438 c.f. 10436-11932 8308-9563
Perforation depth: measured 11160'-11180', 11188'-11226', 11236'-11280'
true vertical subsea
8863'. 8964' (three intervals)
Tubing (size, grade, and measured depth)
4 1/2" L-80 to 10357' with 4 1/2" tailpipe to 10518'
Packers and SSSV (type and measured depth)
13. Attachments
,:~aska Oil
9 5/8"BOTPKB/pkr. at 103579 4 1/2" SSSVat 2092'
Description summary of proposal ..Z._ Detailed operations program ~ BOP sketch ×
14. Estimated date for commencing operation I
February 1989
16. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
17. I hereby certi~ that the foregoingjs true and correct to the best of my knowledge.
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test ~ Subsequent form required 10- ~ O ~
15. Status of well classification as:
Suspended
Approved by order of the Commission
Form 10-403 Rev 06/15/88
.~:I~rJ~;',~AL SIGNED BY
n v ~.~TT~'rnu '
Commissioner
.Approved Copy
Returned
SUBMIT IN TRIPLICATE
WELL M-1.7 (23-13-11-12~ P]~U
ADD'L. PERFORATION PROPOSAL
We propose to perforate the following Sag R. interval during February 1989:
11011' - 11054' MD BKB (Ref. BHCS, 11/6/81)
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to prodction immediately following perforating operations, then tested.
jm
1/25/89
FLOW TUBES
& PACKOFF
FLOWLINE
--
VALVE
BOWEN
PACKOFF
P,--HAND
PUMP
GREASE SEAL
FLOWTUBE
GREASE LINE
RISER
GREASE
"MANIFOLD
BOP
--.,.--GREASE
RESERVOIR
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
SAPC CASED HOLE FINAL LOGS
INDEXED
b--'rANDARD
ALASKA PRODUCTION
Date: 09/08/88
TI: 79287
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
C-36
D-21
E-18
N-15
M-12
M-14
M-17
M-19
S-06
W-06
W-40
X-10
Prod-F 08/21/88 #1 9650-9900 Camco 5"
FM/Temp 08/11/88 ~1 10900-11323 Camco 5"
Prod-F 08/23/88 #1 10900-11160 Camco 5"
Collar 09/03/88 ~1 9600-10000 Atlas 5"
INJ/Temp 08/23/88 ~1 9800-10250 Camco 5"
Inj/Prof 08/29/88 #1 9900-10600 Camco 5"
Temp 08/24/88 #1 11050-11450 Camco 5"
Collar 09/03/88 ~1 10000-10429 Atlas 5"
Inj/Prof 08/22/88 ~2 9752-10500 Camco 5"
Prod-F 08/26/88 #1 13100-13372 Camco 5"
Collar 08/30/88 #1 9400-10550 Camoc 5"
PITS GR/CCL 08/23/88 #1 9800-11000 Camco 5"
Rece i ved
Well Records LR2-1
.
P~'odu¢ t ion Cc~r, po r~'
P 0 E~o~ 196~i2
INDEXED
DALLAS
ARCO
CHEVRON STANDARD
ALASKA PRODUCT ION
E~XON
TEXACO Oate: 01/06/88
IO: bIOBIL TI: 78391
PHILLIPS
STAT~;!iJOF ALASKA ":,~
. GEOSCIENCES '~
REFERENCE:
.~.
SAPC CASED HOLE FINAL LOGS
The fol.lowlng material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
.
'i
COL/Perf. 11/19/87 #1 10590-10750 GO 5"
CCL/Perf. 11/21/87 #1 .9500-9800 GO, . 5"
CNL/GR 12/28/87 #1 11830-12216 SCH 5"
Spinner/TEMP/Hydro on coil tubing 11/21-22/87 #1 9750-10515 GO
Plug setting & Tubing Puncher Record
CCL/Perf. 11/29/87
Completion Record i2/29/87
X-Y CALIPER 11/26/87
CCL/Perf. 11/19/87
Squeeze Perf. Record 12/23/87
12/30/87 #1 3450-3734 Sch
#1 9600-9832 GO 5"
#1 10765-11972 Sch 5"
#1 10400-11710 GO 5"
#1 9500-9900 GO 5"
#1 11192-12138 SCH 5"
5~!
5"
Rece i ved
Dote
AN 1'2
Alask~ Oil & Gas Cons. Commission
Anchorage
A un..I al the. o,.g. nOI 5tondo,d O.I Co.r. Oonl~
Founded .. Cle-e. lon. d. O~.o, .,, 1870
Victoria Aldridge
INFC)RMATION CONTROL
Well Records LR2-1
Standard Alaska
Production Company (
900 East Benson Boulev~._,
P.O. Box 196612
Anchorage, Alaska 995t9-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTIO.t"xF"'
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to stimulate the well.
Yours very truly,
JAB:JAM
Enclosures (9)
cc: J. L. Haas (MB12-1)
M-17 Well File
~rggProduction Operations
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALA L AND GAS CONSERVATION COM SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
At top of productive interval
3201' SNL, 2374' EWL, Sec. 12, TllN, R12E, UPM
At effective depth
3448' SNL, 2079' EWL, Sec. 12, TllN, R12E, UPM
At total depth
3459' SNL, 2067' EWL, Sec. 12, TllN, R12E, UPM
5. Datum elevation (DF or KB)
KBE = 52.13
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
M-17 (23-12-11-12) PBU
8. Permit number
81-105
9. APl number
50--029-2O628
10. Pool
Prudhoe Oil Pool
feet
11. Present well condition summary
Total depth: measured
true vertical
11944 feet
9575 feet BKB
Effective depth: measured 11889 feet
true vertical 9522 'feet BKB
Plugs (measured)
Junk (measured)
Casing Length Size Cemented
Structural --
Conductor 82" 20"x30" 8 cu.yds.
Surface 2700' 13 3/8" 3804 c.f.
Intermediate 10918' 9 5/8" 1930 c.f.
Production --
Liner 1496' 7" 438 c.f.
Perforation depth: measured
11160' - 11280' (three intervals)
true vertical (ss)
8863' - 8964'
Tubing (size, grade and measured depth)
4 1/2" L-80 to 10357' with 4 1/2"' tailpipe to 10518'
Packers and SSSV (type and measured depth)
9 5/8" DOT PBR/packer at 10357'; 4 1/2" SSSV at 2092'
12.Attachments
Measured depth
110'
2728'
10946 '
10436 ' -11932 '
True Vertical depth
BKB
110 '
2700'
8691'
8308'-9563 '
Description summary of proposal []: Detailed operations program [] BOP sketch []
13. Estimated date for commencing operation
May/June 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ /~~ Title Supervisor Production OperationsDate ~/~'~7
~,~J' Commission Use Only
A.
Bragg
Conditions of approval
Approved by
Notify commission so representative may witness
[] Plug integrity [] BOP Test [] Location clearance
Form 10-403 Rev 12-1-85
IApprOvalNO' 7,. 337
by order of
the commission Date ,,~ '~c,~/
Submit in triplicate
Well M-17 (23-12-11-12) PBU
STIMULATION PROPOSAL
A selective mud acid treatment is proposed for the following perforated
intervals in Well M-17.
11160' - 11180' MD BKB
11188' - 11226' MD BKB
The lower interval (11236' - 11280' MD BKB) will be isolated by placing
an inflatable bridge plug between 11226' and 11236' MD BKB.
The treatment will consist of the followingbeing injected through
coiled tubing:
1450 gal. 15% HC1
2900 gal. 12% HCl - 3% HF
1450 gal. 3% NH4C1 brine
600 gal. 3% NH4C1 brine w/diverter
The well will be retUrned to production immediately following treatment,
then tested.
jm
5/18/87
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off
Blind Rams
~ ! Cutter Rams
( (~..~.~2' Chi~ksan (Kill Line)
(
Slips,
(
Pump-In Sub
Pipe Rams
(Circ ulate/R e turns)
W ell Head
swab Valve
Standard Alaska
Production Company
900 Eost ~en~,on Bouleva~c~
P.O. ~ 19~12
Anchoroge. AIo~ko 995
(~71 564-511 I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 01/06/87
TO: MOBIL TI: 77644
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
A.-16 - Injection Profile/Flowmeter/Temp
A-23 Temp. 10/24/86
A-23 Borehole Audio Tracer 10/24/86
A-23 Borehole Audio Tracer 11/06/86
A-23 DFT 11/06/86 tI1
B-9 Borehol~ Audio Tracer 11/16/86
D-17 CCL/Perf. 11/23/86 #1
D-18 CCL/Perf. 11/23/86 #1
D-26 Spinner 12/07/86 #I
D-27 CCL/Perf. 11/19/86 t~1
D'-28 CCL/Perf.. 11/20/86 J!1-3
E-7 EPL 07/23/86 #1
E-9 CCL/Perf. 11/16/86 #1
E-9 Cont. Flow Survey 11/29/86 #1
E-9 Temp. 11/29/86 #1
G-31 CCL/Perf. 11/10/86 #1
~-15 Collar 12/07/86 #1
H-20 CCL/Perf. 10/25/86 #1-2
M-17 Temp. 11/29/86 #1
M-22 CCL 10/30/86 j/1
P-14 GR/Correlation 11/07/86 #1
T-I' Injection Profile 11/22-23/86 #I
U-3 Injecion Profile 11/29-30/86 ~tl
11/26-27/86 ~1 . 9900-11182 Camco
2700-10100 GO 2"/5"/1"
#1 1000-10600 GO 2"
#1 500-10600 GO 1"
3950-10600 GO 5"
#1 1900-3200 GO 5"
8850-10346 GO 5"
10700-11260 GO 5"
10500-10870 Camco 5"
8650-9690 GO 5"
9500-11110 GO 5"
8350-9457 Sch 5"
10600-10980 GO 5"
10500-10905 GO 5"
10500-10905 GO 5"
6980-9228 GO 5"
0-2500 CAMCO 5"
9050-102 00 GO 5"
11000-11758 GO 5"
9500-10550 GO 5"
10790-11000 GO 5"
10400-10923 CAMCO 5"
9000-9530 CAMCO 5"
Victoria Aidridge
INFORMATION CONTROL
Well Records LR2-1
511
Standa,d Alaska /~
Production Company ~,
900 East 8ansan Boulevoi~
P.O. Bo~ 1966)2
Anchorage. Alaska ~519-66
{~71 ~4-~11 1
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL.
PHILLIPS
sTATE OF ALASKA
GEOSCIENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 11/05/86
TI: 77490
REFERENCE:'
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith.. Please acknowledge receipt by
signing a copy of this letter and returning It to this office: -
D-11 Caliper 10/27/86 #1 29-9510 Camco 5"
G-19 CET 06/27/86 #1 10330-11550 Sch 5"
M-4 Perf. Record 05/25/86 #1 9370-11660 Sch 5"
M-17 Perf. Record 06/01/86 #1 11000-1,1749 Sch 5"
N-7 Packer Depth 05/21/86 #1 9400-10450 Sch 5"
R-12 Perf. Record 06/03/86 #1 10400-10968 Sch 5"
R-23 Perf. DePth Record 05/06/86 #1 11490-11900 Sch 5"
U-12 Perf. Record 05/30/86 #1 10800-11100 Sch 5"
X-5 CET/GR ~' 05/10/86 #1 9468-10700 Sch 5"
Y-20 GCT 06/21/86 #1 Surf-12107 Sch 5"
Y-23 GCT 06/23/86 #1 -8-11566 Sch 5"
Rece I ved
A un,!
found~
~a~ mt & Gas Cons. Corn
-- Anchorage
tondofd C~I Co,npon¥
~*o. ,n 1870
Vict~ Aldridge
INFORHATION CONTROL
Well Records LR2-1
900 Eo~ b,n~n ~
1907') 564-$ I I I
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
_. GEOSCIENCES
INDEXED
STANDARD.
ALASKA PRODUCTION
Date: 08/21/86
TI: 77278
REFERENOE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following maffe~ial Is being submll"ted herevith. Please acknowledge receipt by
signing a copy of ~his lel~ec and returning I~ to this office:
BHPD & Flowing Gradient 07/14/86 Camco
Static Gradient 07/19/86 Camco
Static 07/12/86 GO
Static 07/31/86 Camco
Static 08/02/86 Camco
PBU & BHPD 07/15/86 GO
PBU & BHPD 07/15/86 GO
PBU & BHPD 06/18/86 Camco
Flowing Gradient 06/22/86 Camco
Static 07/21/86 Camco
Flowing Gradient 06/16/86 Camco
Static Gradient 07/27/86 Camco
Static Gradient 07/18/86 Camco
BHPD & PBU 05/14/86 Dresser
Static & Step Rate 07/19/86 GO
Pressure BU 07/22/86 GO
Anchorage
Rece I ved
Da?e
Fo~,,ded .n Cle.,elon(J Oh...~
Victoria Aldridge LR2-1
I NFORHAT I ON CONTROL
We!l Records LR2-1
Standard Alaska
Production Company f
900 East Benson Boulev~.
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
STANDARD
ALASKA PRODUCTION
June 25, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry
Well Operations, for the above-named well. This contains
our subsequent report of performing a cement squeeze and
perforation of the well.
Yours very truly,
JAB: JAM
Enclosures (4)
cc: J. L. Haas, ~12-1
Well Records, LR2-1
M-17 Well File
3.~' A. Bragg, Supervisor
Production Operations
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
:' .... STATE OF ALASKA
',' ALASK _,L AND GAS CONSERVATION COMMI ~ ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ~' Stimulate ~ Plugging ~ Perforate ~ Pull tubing
Alter Casing '~ Other _X
2. Name of Operator 5. Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTION COMPANY KBE = 52.13 Feet
3. Address 6. Unit or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4. Location of well at surface
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
At top of prOductive interval
3201' SNL, 2374' EWL, Sec. 12, TllN, R12E, UPM
At effective depth
3448' SNL, 2079' EWL, Sec. 12, TllN, R12E, UPM
At total depth
3459' SNL, 2067' EWL, Sec. 12, TllN, R12E, UPM
11. Present well condition summary
Total depth: measured
true vertical
11944 feet ,
9575 feet BKB
Plugs (measured)
7. Well number
M-17 (23-12-11-12) PBU
8. Approval number
46
9. APInumber
50-- 029-20628
10. Pool
Prudhoe Oil Pool
Effective depth: measured 11889
true vertical 9522
feet Junk (measured)
feet BKB
Casing Length Size
Structural --
Conductor 82 ' 20"x30"
Surface 2700' 13 3/8"
Intermediate 10918 ' 9 5/8"
Production --
Liner 1496' 7"
Perforation depth: measured
11160' - 11280'
true vertical (subsea)
8863' - 8964'
Cemented
8 cu.yds.
3804 c.f.
1930 c.f.
438 c.f.
(three intervals)
Measured depth'
110'
2728'
10946'
10436'-11932'
Tubing(size, grade and measured depth)
4 1/2" L-80 to 10357' with 4 1/2" tailpipe to 10518'
Packers and SSSV(type and measured depth)
9 5/8" BOT PBR/packer at 10357'; 4 1/2" Camco SSSV at 2092'
True Vertical depth
BKB
110'
2700'
8691'
8308'-9563'
t2.
Stimulation or cement squeeze summary
See attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Final pressure = 2300 psig.
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure ~bing Pressure
200 42 612 1606 198
110 23 337 1543 196
14. Attachments
Daily Report of Well Operations L~ Copies of Logs and Surveys Run
15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~
Form 10-404 Rev. 12-1-85
Title Supervisor Production Operations Date %-~-%%
Submit in Duplicate
Well M-17 (23-12-11-12) PBU
CTU CEMENT SQUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations and a confirmed
cement channel to the OWC was performed as detailed below.
1. Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi.
2. Lay in mud from PBTD to 11305' MD.
3. Pumped in cement and squeezed off perforations and cement channel.
4. Contaminated cement in the wellbore.
5. Reversed out-cement after 24 hours.
6. Rigged downcoiled tubing unit. Rigged up lubricator and tested
to 3500 psi. Reperforated the following intervals using Schlumberger
2 7/8" Hyperdome guns at 4 spf:
11160' - 11180' MD
11188' - 11226' MD
11236' - 11280' MD
7. Put well back on production and tested.
Work was completed on June 1, 1986.
jm
6/4/86
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
GEOSCIENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Oote: 06/09/86
TI: 77106
Page 1 of 2!!
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The follo~ing material Is being suDmltted herewith, please acknowledge receipt by
slgnlng a copy of thls lel~er and returnlng It to this office:
A-1 Static Gradient 05/18/86 Camco
A-5 " " 03/22/86 "
A-31 " "& BDIPD 04/08/86 Otis
A-34A " "&" 04/09/86 Otis
A-35 " "& " 05/17/86 GO
A-35 Pres. BU Survey 05/15/86 GO
B-1 Static Gradient 05/15/86 Otis
B-2 " " 03/i7/86 Camco
B-23 " '" 05/21-22/86 Camco
D-6 " 03/14/86 GO
D-19 " " 03/23/86 Camco
D-19 BHPD & Survey 04/29/86 Otis
D-23 Static. Gradient 05/23/86 Camco
E-1 " " 03/14/86 Camco
F-4 BHP Survey 04/03/86 Otis
F-10 Static Gradient 03/23/86 Camco
F-24 BHP Survey 04/04/86 Otis
H-26 Static Gradient 05/25/86 Camco
H-27 " " 05/25/86 Camco
K-8 Static Survey 03/26/86 GO
M-5 BHP Survey 05/18/86 Otis
M-17 Static Gradient 05/06-07/86 Camco
N-4A " " 03/20/86 Camco
N-20 BHP Survey 04/05/86 Otis
N-20 BHPD & PBU /86
N-22 BHPD
Rece I ved
Date
..,,, o! ,he o,,~.~,,; 5~¢1 ¢),.,~,,,y /
Victor:
I NFORMAT I ON
Wel I Records
'idge
LR2- !
LR2-1
06/09/86
?e. 77104
Page 2 of 2!!
R-23 Flowing Gradient
N-22 BHPD & PBU
S-8 Flowing Gradient
S-10 " "
S-13 " "
X-2 Static Gradient
~ Flowing Gradient
X-9 Static Gradient
X-25 . " "
Y-2 BHP Survey
Y-9 -'~ BHP Survey
05/11/86
05/15/86
03/13/86
05/17/86
03/16/86
05/26/86
03/26/86
05/19186
05/14/86
04/07/86
05/15/86
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Otis
Otis
·
Victoria Aldridge LR2-1
ST/ ND/ RD
AL ASY-,A PRODUCIION
05II1186
oa're:~
'7'/065
REFERENCE:
pteaSe ockn°~iedge receipt by
The {oitOwlng material Is being subml't.ted here,,,t.th.
signing a copy of .this te.t.ter end re.turning I.t .to .this office:
DAL/UNiT / STATE/GEOS: 05/09/86 #1 9200-9732 camco 5"
production profile 04/05/86 ~1 11500-11870 GO 5"
1866 Camco 5"
B-3A Survey 5"
B-5 Cont- Flow 04/12/86 #1 11500-1
Spinner 04/20/86 #_ 11800-12300 otis
B-5 Temp .....Survey 04/09/86 #1 20-2500 CamCO 5"
otis
F-18 5"
H-27' Temp- 04/17/86 ~,~_ 10650-10850 5"
Spinner 05/04/86 #1 11250-11700 CamCO
K-8 Temp-WOPITS 05/6-7/86 ~1 10500-11779 CamCO 5"
camco
M-4 Temp./CCL 5"
M-17 pump-in 04/21/86 ~tl 10200-10450 5"
Spinner 04/06/86 ~!1 9000-9750 GO
N-4A Temp/Collar 05/11/86 ~1 10050-10400 CamCO 5"
Q-1 profile ~1 10300-10870 Camco 5"
S-1 production 03/15/86 ~ 5"
S-2 production profile 04/09/86 #1 20-2500 Camco
U- 10 T emp-
X-14 cont- Flow Survey
· 042/5/86 f~l 11300-11560 GO
A~&sKa 0il & Gas Cons. Commission
%/ictoria Aldr~d~e LK2-1
we~% Reco¢ds LR2-%
Date
Standard Alaska ,~
Production Company ~
900 East Benson Bouleva%,
P,O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
STANDARD
ALASKA PRODUCTION
April 29, 19 86
Alaska Oil & Gas COnservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in tripliCate, is Form 10-403, Application for
Sundry Approvals, for the above-named well. This contains
our proposal to perform a cement squeeze and perforation
of the well.
Yours very truly,
JAB: JAM~
Enclosures (9)
cc: J. L. Haas, FTB12-1
Well Records, LR2-1
M-17 Well File
//. A_. B.ragg, Sup~r~f:/'isor
Production Operations
A unit of the original Standard Oil Company
Founded in Cleveland;,Ohio, in 1870.
STATE Of ALASKA
APPLIO 'I'ION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown C Re-enter suspended well ~ Alter casing ~
Time extension ? Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~ Amend order ~ Perforate ~ Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
At top of productive interval (top Sag Rd SST.)
3201' SNL, 2374' EWL, Sec. 12, TllN, R12E, UPM
At effective depth
3448' SNL, 2079' 'EWL, Sec. 12, TllN, R12E, UPM
At total depth
3459' SNL, 2067' EWL, Sec. 12, TllN, R12E, UPM
5. Datum elevation (DF or KB)
KBE = 52.13 feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
M-17 (23-12-11-12) PBU
8. Permit number
81-105
9. APl number
50--029-20628
10. Pool
Prudhoe Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
11944 feet Plugs (measured)
9575 feet BKB
Effective depth: measured 11889 feet Junk (measured)
true vertical 9522 feet BKB
Casing Length Size Cemented
Structural · -.-
/
Conductor, 82' 20"×30" 8 c.y.
Surface 2700" 13 3/8" 3804 c of.
Intermediate 10918' 9 5/8" 1930 c · f.
Production --
Liner 1496' 7" 438 c.f.
Perforation depth: measured
11160' - 11280' (three intervals)
true vertical (subsea)
8863' - 8964'
Tubing (size, grade and measured depth)
4 1/2" L-80 to 10357' with 4' 1/2" tailpiPe to 10518'
Packers and SSSV (type and measured depth)
9 5/8" BdT PBR/pack~r at 10357'_: 4 1/2" C~mco SSSV at 2092'
12.Attachments
Measured depth
110'
2728'
10946'
10436'-11932'
True Vertical depth
BKB
110'
2700'
8691'
8308'-9563'
APR 0 1986
Alaska O,i & S.?,s Cons.
Description summary of propoSal [~ Detailed operations program Q BOP sketch
13. Estimated date for commencing operation
May, 1986
14. If proposal was verbally approved
Name of approver
Date approved
15.. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Title Supervisor Production Operations Date
. A. Bragg ~ ~;
Commission
Use
Only
Conditions of approval
Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] Location clearance
I
Approved by
Ret,~urn.~d _
,.. by order of
Commissioner the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
Well M-17 State Sundry Notice
A coiled tubing cement squeeze of existing perforations and a
confirmed cement channel to the OWC in Well M-17 is proposed.
After CTU operations, the squeezed perforations will be
reperforated. The work is outlined as follows:
Rig up coiled tubing unit and pressure test BOP' s to
4000 psi.
2. Lay in mud from PBTD to 3~305' MD.
3. Pump in cement and squeeze off perforations and cement
channel.
4. Contaminate cement in the wellbore.
5. Reverse out contaminated cement after 24 hours.
6. Reperforate the following intervals at 4 spf:
l~160 - ll~80' MD BKB
~88 - 1~226' MD BKB
11236 - ~280' MD BKB
7. Put well back on production and test.
SOHIO ALASKA PETROLEUM COMPANY
PAGE ~' OF
PETROLEUM
SUBJECT: ~-Z~"~" ~""'~
PREPARED BY:
APPROVED BY:
ENGINEERING OPERATIONS MANUAL
REVISION NO.
, DATE ~- .~ 7'-~- ,
APR ~
Alaska Oil & Gas Cons.
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO: SFO/UNIT/STATE: TE]OkCO
(-Marathon) MOBIL
PHILLIPS
BPAE
3 ! 11 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 8.~07-85
T#: 76369
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith, e~~ase acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE:
E-4 ~
M-17
R-24 ~
-7 --
Completion Record
Packer Positioning
GR/CCL
Temp ' Log
HP Survey
Temp Log
Completion Record
11-22-84 8296-8660 Sch #1
2-06-85 10506-11100 Sch #1
7-20-85 11000-11400 Camco #1
5-14-85 175-9543 Sch #1
7.-21-85 11000-11500 Camco #1
6-01-85 9200-9572 Sch #1
St! ~
SFO/ARCO ONLY:
R-24
T-1
CBL
CBL
12-17-84 8900-9772 Sch #1 5"
1-07-85 10380-10952 Sch "~1 5"
RECEIVED
DAT[
~v ~' ~ ~'Ca~-~ Perkins LR 2-1
M~- -
Technical Documentation
"'-. ~ .......~.~-i,~ (~ons. ,~mmission Records Management
1:' :qqhm'~ge
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
· o. SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL
PHILLIPS
TATS?
~.
BPAE (Transmittal Only)
INDEXED
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date:
T#:
.7 -30-85
76344
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
A-5
M'17/
R-9 J
R-24 ~
Y-3
7-17-85
7-12-85
7-13-85
7-10-85
7-18-85
7/4-5/85
7/1-3/8'5
7-22-85
Flowing Gradient Camco
Static Gradient Camco
Static Gradient Camco
Flowing Gradient Camco
Static Gradient Camco
Flowing Gradient/BHPD Camco
Flowing Gradient/BHPD Camco
Static Gradient Camco
RECEIVED
DATE
Records Management
............... co. .
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
To~ SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
DHILLIPS
STATE '
BPAE (Transmittal Only)
311 ] "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date:
T~:
3/5/85
76035
REFERENCE:
SOHI~FINAL DATA - PRESSURE SURVEY DATA
.,~e following material is being submitted herewith. Please acknowledge receipt by signing a
L copy of this letter and returning it to this office:--
H-8~
H-17 L./
H- 18 ..~
H-19
H_20'~,/
r-ii'
K- 3.../
K_6~./
K-2A ~
M-17 ~
N. 18 V
R-9 ~
R- 10 ~
S-8~
PBU & BHPD
Flowing Gradient & BHPD
PBU & BHPD
PBU & BHPD
Flowing Gradient & BHPD
Static Gr. adient
Static Gradient
Static Gradient
Static Gradient
Static Gradient
Gradient & BHPD
Flowing Gradient
PBU & BHPD
Static Survey
Static Gradient
PBU & BHPD
PBU & BHPD ~:
1/31-2/2/85 Go
1/30-2/1/85 Camco
2/3/85 & 2/4/85 Go
2/5/85 & 2/6/85 Go
2/2-2/3/85 Camco
2/6/85 Camco
2/8/85 Camco
2/10/85 Camco
2/12/85 Camco
1/4/85 Otis
1/17 & 1/19/85 Camco
1/17-1/18/85 Camco
2/7 & 2/8/85 Go
12/2/84 Go
2/18/85 otis
2/14 & 2/17/85 Go
2/9 & 2/11/85 Go
RECI-:,VED "'~"~'-~'<,~-L .~=.._... ~._,~ Cathy Perkins
' "~ ],..'~;..~~evelopment Geology
' '~ Well Records
OATE .......................
~O'~l-dSStO~
SFO
ARCO
CHEVRON
EXXON
~o SFO/UNIT/STATE' TEXACO
(-.~(ara thon) MOBIL
PHILLIPS
STATE OF AK
BPAE
3~ ~ 1 'C" $1REE~
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
Date:
T~/:
02/06/85
75997
REFERENCE
SO~0~CASED HOLE FINAL LOGS :
co h~ following material is being submitted herew,th. Please acknowledge receipt by signing a
y of this letter and returning it to this otfice:--
M-17 Spinner ,
X-7 Spinner
G-10 Cont. Flow
R-9 Cont. Flow
1./17/85 ~1 11050-11350 Camco 5"
1/3/85 #1 10600-11000 Camco 5"
1/6/85 #1 9600-10000 GO 5"
12/12/84 #! 9050-9500 GO 5"
Victoria Aldr±dge LR2-1
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
December 18, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well M-17 PBU
Enclosed,
Wells, for the above-n~nmed well. This contains
performing a mud acid treatment on this well.
JAB/~/\/p j w
our subsequent
in duplicate, is Form 10-403, Sundry Notices and Reports on
to
James A. Bragg
District Petroleum Engineer (Acting)
Enclosures
cc ·
A. E. Leske
Well File #17
,RECEIVED
a!aska Oil & Gas Cons. ", ' -
CommlssJon
Anc~orage
f ....STATE OF ALASKA (~
ALASKA . AND GAS CONSERVATION C ~IlSSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL E~ OTHER []
2. Name of Operator
Sohio Alaska Petroleum C~mpany
3. Address
P.O. Box 6612, Anchoraqe, Alaska
99502
4. Location of Well
At Surface:
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
·
KBE = 52.13' AMSL
I 6
. Lease Designation and Serial No.
ADL 28260
12.
7. Permit No.
81-105
8. APl Number
50- 029-20628
9. Unit or Lease Name
Prudhoe Bay .Unit
10. Well Number
M-17 (23-12-11-12) PBU
11. Field and Pool
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate}
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation ~] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals .in ~his well were treated with a 200 gal/ft. 6 %/1.5%
HC1/HF trea~t with both an HCl pre-fiushandpost-flush on November 30, 1984.
The treatment was conducted through a bullhead method. The SSSV was removed
prior to the treatment and reset after the job at 2092'.
11160 '-11180 ' BKB (Ref. BHCS/GR, 11-6-81)
11188'-11226' BKB ( " )
11236'-11280' BKB ( " )
RECEIVED
DEC 2 0 198
Alaska 0il & ~s 60~'~s. Commission
'Anchorage
~~~_1. ~hereby certify that the foregoing is true a rect
f/The space below for Commission use
to the best of my knowledge.
D±str±ct Petroleum Engineer
Title
Conditions of APproval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET, .
ANCHORAGE, ALASKA
/
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
October 23, 1984
Alaska Oil & Gas Conservation Cc~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentla~en:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to perfom
matrix stimulations on these wells.
JAB/~~pjw
Enclosures
cc: J. D. Hartz
Well File #17
Yours very truly,
istrict Petroleum Engin (Acting)
RECEIVED
OCT 2 6 ]98.
Alasl(a Oil & Gas Cons. Commission
Anchorage
ALASI("' '¢~ STATE OF ALASKA ~¢
.~._ AND GAS CONS,ERVATION~O~ .... vllSSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELLX3
OTHER []
2. Name of Operator
Sohio Ala~ Petroleum Company
3. Address
P.O. BOX 6612, Anchorage, Alaska 99502
4. Location of Well
At Surface:
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
~qzE = 52.13' AMSL
6. Lea~e Designation and Serial No.
ADL 28260
7. Permit No.
81-105
8. APl Number
50- 029-20628
9. Unit or Lease Name '
Prudhoe Bay Unit
10. Well Number
M-17 (.23-12-11-12) PBU
,
11. Field and Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate ~ Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion,)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals in ~s ~11. will be treated with a 4.0 gal/ft, scale'
inh~itor matrix treatment in November, 1984. The trea~t will be conducted
through a bullhead ~method. The treatment will be preceded by a 2000 gal. EDTA
tubing wash.. The SSSV will be removed prior to the treatment and reset after
the. job at 2092'.
11160 '-111.80 ' BKB (.P~f. BE~/GR,...11-6-81)
11188'-11226' BKB ( ' "'" ' )
11236'-11280' BKB ( " )
RECEIVED
OCT 2 6 ]984
~.~,hs~uent ~¥or~k?~j~orte~ Oil & Gas Cons. Commission
nlehereby certify that the foregoing is true and correct to the best of my knowledge.
The sp below for Commission use
Condit~'o~s of Approval, if any:
Approved Copy
Ret~rnecl / /
9¥ 9AR~Y T. ~gGLE8 By Order of
Approved by COMMISSIONER the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
August 24, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our subsequent to
re-perforating the well.
Yours very truly,
JAB/~PJw
Enclosures
cc: J. D. Hartz
Geology
Well File ~17
A. Bragg
strict Petroleum Engineer (Acting)
AUG2
AlaSka Oil & Gas Cons. commissure1
Anchorage
STATE OF ALASKA
ALASI~' C,~' AND GAS CONSERVATIOI~' 7~'MISSION
SUNDR I TICES AND REPORTS JN WELLS
1. DRILLING WELL I--I
COMPLETED WELL []
OTHER []
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska
99502
4. Location of Well
At Surface:
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 52.13'
6. Lease Designation and Serial No.
ADL 28260
7. Permit No.
81-105
8. APl Number
5o- 029-20628
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-17 (23-12-11-12) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
[]
[]
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals were re-perforated July 26, 1984 using Schlumberger
2 7/8" Hyperdomes at 4 spf. A lubricator was installed and tested to 3500
psi for all well work.
11160'-11180' BKB (Ref. BHCS/GR, 11/6/81)
11188'-11226 ' BKB ( " )
11236'-11280' BKB ( " )
An SSSV was set and tested in the ball valve nipple at 2093'.
Signe~
Th~w for Corn_miss,on use ~/ ~/
"Conditio~i~/of Approval, if any:
RECEIVED
AUG 2 7
Alaska 0il & Gas Cons, C0mmlssion
Anchorage
that the foregoing is true and correct to the best of my knowledge.
Title District Petroleum Engineer
Date
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate'
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
June 22, 19 84
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gentlemen:
Mr. C. V. Chatterton
Well M-17 (23-12-11-12) PBU
Enclosed,
on Wells, for the .above-named well.
re-perforate the well.
in triplicate, is Form 10-403, Sundry Notices and R~ports
This con%ains our proposal to
GJP/~/pjw
Enclosures
cc: J. D, Hartz
Well File ~17
Yours very truly,
~~s~ ~ Dis ~%rict p~g~eer
RECEIVED
JUN 2 7 1994
Alaska 0ii & Gas Cons.
STATE OF ALASKA
ALASKA~ AND GAS CONSERVATION C~' 'MISSION
SUNDRY I JTICES AND REPORT. JN WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator
Sohio ~l~.~_k.a Pet~o!eum cc~ny
3. Address
Pouch 6-612, ~-~)raqe, Ala~'ka
4. Location of Well
99502
At Surfaoe:
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
7. Permit No.
81-105
8. APl Number
s0-029-20628
9. Unit or Lease Name
p~a~ Ba_v Unit
10. Well Number
M-17 (23-12-11-12)
11. Field and Pool
5. Elevation in feet {indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ~ Oil Pool
KRR = 52.13' AMSL I ~D_L 28260
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate ~ Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
{Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals 'will be re-perforated in July, 1984, using Schlumberger
2-7/8" Hyperd~ guns at 4 spf.
A lubricator will be installed and tested to 3500 psi for all well work.
11160'-11180' BKB ~. BHCS/GR, 11/6/81)
11188'-11226' BKB ( " )
11236'-11280 ' BKB ( " )
An SSSV will be set and tested in the ball valve nipple at 2093'.
Subsequent Work Repor~e~
on Form No./~ Dated
RECEIVED
- JUN 2 7 I984
Alaska 0ii & Gas Cons. C0mmJss/0a
Anchorage
1 . I hereby certify that the foregoing is true and correct to the best of my knowledge.
E ~ ~e~J~d . _ _ ~/% TitleDiSt'~iCt ~e~rolet3~ ]]~r!cJ'~
The spaF/~lo~v f°r C0mmissio s
Conditi{~fl's of Approval, if any: ApprOv~
~.tu~
By Order of
Approved by COMMISSIONER the Commission
Date
Submit "Intentions" in T'riplicate
Form 10-403
Rev. 7-1-80
and "Subsequent Reports" in Duplicate
A-11
A-17
A-9
A-10
N-15
· M-17
M-16
E~ll
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
311 I "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907l 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
GETTY
zo: SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES(CC#'s-Transmittal Only)
Date: 9-15-82
Trans.#: 2630
55630
CC#:
RENCE:
SOHIO CASED HOLE FINAL LOGS , '
. .
· .
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter ,and returning it to this office:--
Sch TDT-M #1
Sch TDT-M #1
Sch. TDT-M #1
Sch TDT-M #1
Otis Spinner #1
Sch Completion #1
Record
Sch Completion #2
Record
Sch TDT-M #1
7/31/82 9700-10644 5"
8/2/82 9900-10827 5"
8/1/82 9150-9992 5"
8/3/82 9650-10550 5"
8/27/82 9800-10067 5"
8/9/82 10'2.34-11835 5"
8/4/82 10100-11660 5"
8/6/82 1'0100-10760 5"
12)
RECEIVED
DATE
Anchorage
Karen Mestas
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
September 8, 1982
well M-17 (123-12-11-12)
Enclosed, in duplicate, are the following forms for the above named
well.
1. Form 10-407, Completion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
Y s very trulI,
~Distr~Field E~eer
GJP:JLH:pjs
Enclosures
cc: J. D. Hartz
Geology
Well File 917
"' ("~' STATE OF ALASKA O~"
ALASKA ..... AND GAS CONSERVATION C · .¢IlSS,ON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL k---~ GAS [] SUSPENDED [] . ABANDONED [] .SERVICE []
·
-2. Name of Operator .... 7. Permit Number '
Sohio Alaska Petroleum Company 81-105
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20628
4. Location of well at surface 9. Unit or Lease Name
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM. Prudhoe Bay Unit
10. Well Number
At TopProducing Interval top Sacj Rive~; SSTJ. N,T1
R12~.,
M-17
(23-12-11-12)
3201' SNL, 2374' EWL, Sec. £2,
UPM
At Total Depth 11. Field and Pool
3459' SNL, 2067' EWL, Sec. 12, TllN, R12E, OPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 52.13' AMSL ADL 28260
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
10/10/81 11/5/81 11/13/81 feet MSLt one
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth Where SSSV set 21. Thickness of Permafrost
· 11944'MD 9575'TVD 11889'MD 9522'TVD YES~k NO[] 2093' feetMD 1866'
22. Type Electric or Other Logs Run
GR/SP/DIL/BHCS, HD~ FDC/CNL/GR/CAL, CBL/VDL/CCL/GR, gyroscopic survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSIZ'E WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" x 30"Insulat'e~ Conductcr surfac~.~ 110' ·36'" 8 cu.yds, concrete
13 3/8" 72~ L-80 Surfac,: 2728' 17 1/2" 38'04 cu.ft. Permafr¢st II
9 5/8" 47~ L-80 Sur'fac~ 10946., .12 ..'~1/4 ',: .1800 cu.ft, Class G; ..
130 cu. ft. Permafro.~t C
7'! 26# ~ L-80 10436, 11932' 8 1/2" 438 cu.ft. Class G ~,/18~ salt
24. PerforationsoCento'Prdduction (MD+TVD of Top and Bottom and,. . 25. TUBING RECORD
interval, size and number) . MD i' 'TVD sIZE ' DEPTH SET ('MD) PACKER SET (MD')
Prudhoe Oil Pool top: 11160' 8863' 4 1/2" 10520' 10357'
Bottom: 11280, .8964'. ..
11160' - 11180' BKB (18863' - 8879! .TVI~Ss) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
ll18r8 ' ,- .11.208'. BKB. (8886' - 8903' ,TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
.
11208' -11226' BKB (8903' -8918' TVDss) . ....
11236' -11260' BKB ('8927' -8947' TVDss)
' 11260' - 11280' BKB ('894.7..'. 8964'!~ .TVDss) .... .....
' PROD'UCTI'LNO TEs~ ' ~ :'~"'
27.
Date First Production . Method of Operation (Elow rig, gas lift, etc.) ,,ur- 0 l~," ·
· , ' , . , , - ,~ . '. · : . .. ,,~ 4. ' , :, ., ,'~ . . : ?. · .,.
- August 11, 1982 Flowing ..... , ...... ,~t~,.~n;~ .o ,- .....
Date of Test ! Hours Tested PRODUCTION FOR OIL-SSL GAs-M~F ~/ATER-BBL CHOI~!~IZE !
· . , ,. TEST PERIOD ~ '""C:'3¢'~;1
Flow,:T.ub!ng Casing. Pressure CALCULATED .. OIL-BBL GAS-MCF- .... WATER-BBL OIL GRAVITY-APl (corr)
r'Pre$$,, ~ r ~ ~ · 24-HOUR RATE , , :,
28.
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
,, -
, ".. ¢ .: . .. '" ,: , ,, .
None
·
. ..
,. .";: ¢ ',, ~. ¢i. ~ ;" ' ' ' . ' '
. .
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. : -'30~ ........................
-,
GEOLOGIc MARKERs FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
BKB Subsea
Sag River SST. 11021' 8698'
Shublik 11055 ' 8725 '
.,
.
._
31. LISTOF ~T ' ' ,
ATTACHM/ i S ,
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If ~,...!s well is comPleted for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24~'Show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement:
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
STATE OF ALASKA
ALASKA UlL AND GAS CONSERVATION C MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 81-105
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20628
4. Location of Well
At Surface:
3187' SNL, 607' WEL, Sec.
01, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 52.13' AMSL
6. Lease Designation and Serial No.
ADL 28260
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-17 (23-12-11-12)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations E~ Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interVals were perforated August 11, 1982, using~Schlumberger
2 7/8" Hyperdome guns at 4 spf. A l~bricator was installed and tested to
3500 psi for all well work.
11160' - 11180' BKB (~Ref. BHC$/GR, 11/6/81)
11188' - 11208' BKB ( " )
11208' 11226" BKB (~ " )
11236' - 11260' BKB ( " )
11260' - 11280' BKB ( " )
An SSSV was set and tested in the BVN at 2093'.
CblV£D
$£'p 0 9 i982
~be~a gC ' Title District Field Engineer Date
T' e sw ~for ommissio /
Conditions o I, if anY:
By Order of
Approved by COMMISSIONER the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
' .. ~ f STATE OFALASKA
ALASKA(_ .AND GAS CONSERVATION C~...vlfSSlON
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling well [] Workover operation []
2. Name of operator 7. Permit No.
Sohio Alaska Petroleum Company 81-105
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20628
4. Location of Well -.
atsurface 3187' SNL, 607' WEL, Sec. 01, TllN, R12E, OPM
9. Unit or Lease Name
Prudhoe Bay Unit
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
~RV. = 52.1~q' AM~LI ADL 28260
10. Well No.
M-17 (23-12-11-12)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of August
,19 82
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
1 6. DST data, perforating data, shows of H2S, miscellaneous data
See attachment
SEP 0 9 J,~82
17. I her y t g is true and correct to the best of my knowledge.
NO-I-E--13~ort on th~orm is requirei~ for each calendar month, regardless of the status of operations, and must be ~il0~cl in tduplicate
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404
Rev. 7-1-80
with the Alaska
Submit in duplicate
PERFORATING DATA - Well M-17 (.23-12-11-12)
August 3, 1982
August 9-11, 1982
August 11, 1982
August 16, 1982
August 17,1982
Pressure tested tubing and inner annulus.
Rigged up Schlumberger and perforated the following
intervals using 2 7/8" Hyperdome guns at 4 spf:
11160' - 11180' BKB (Ref. BHCS/GR, 11/6/81)
11188' - 11208' BKB ( " )
11208' - 11226' BKB ( " )
11236' - 11260' BKB ( " )
11260' - 11280' BKB ( " )
Put well on production.
Shut well in to prepare for static pressure survey.
Ran static pressure/temperature survey at 8800' TVDss.
Set and' tested SSSV in ball valve nipple ~a~ 2~093'.
Well onpro~uction.
.~.~ask~ Oil & Gas CODS. ComrnJssio~
SOHIO ALAS PETROLEUM COMPANY
SFO .
ARCO
CHEVRON
EXXON '~.
¢o: SFO/UNIT/STATE:
(-Marathon)
CENTRAL
GETTY
MOBIL
PHILLIPS
STAT~~
BPAE (Transmittal Only)
FILES (CC#'S - Transmittal Only),
3111 "C"STREET
Ar4CHORAG£. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
9/3/'82
Date:
Trans. #: 2 60'3
CC#: 55603
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
he following material is being submitted herewith. Please acknowledge receipt by signing a
Copy of this letter and returning it to this office:--
A-9~//Pressure Survey & BHPD
A-i&" .Pzessure Survey & BHPD
A-14O- / ,, ,,
A-19 / " "
R_8 ,,~/ ,, ,,
X-9 v.,/ ,, ,, ,, ,,
Y-13 " "
Otis 8/13/82
Otis 8/7/82
Otis 8/27/82
Camco 8/16/82
Camco 8/16/82
Camco 8/17/82
Otis 8/15/82
GO 8/22/82
/82)
RECEIVED
DATE
19
A!o.$ka Oil & Gas Cons. Commissian
Anchorago
Victoria Aldr_idg~
Development GeoAogy
Well Records TP1-5
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
July 1,9, 198.2
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V.~Chatterton
WELLS R-8, Y-10, Y-13, A-15, A-18, A-19,
E-10, E-15, E-17, E-18, E-20,
E-21, G-18, M-15, M-16,~!'~i~i!ii!'::
Gentlemen:
Enclosed, in triplicate, is Form 10-403, SundrY Notices and
Reports on Wells, for the above-named wells. This contains
our.proposal to perforate the wells/~
~ ~is~;i'ct~:id Engineer
GJP:JLH:ybr
Enclosures
cc: J.D. Hartz
Geology
Well File #17
STATE OF ALASKA
ALASK ,L AND GAS CONSERVATION C ,MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL
COMPLETED WELL []
OTHER
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 81-105
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20628
4. Location of Well
At surface:
3187' SNL, 607' WEL, Sec. 01, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 52.13' AMSL
6. Lease Designation and Serial No.
ADL 28260
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-17 (23-12-11-12)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil PoOl
12.¸
(Submit in Triplicate)
Perforate ~[] Alter Casing [] - Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals will be perforated during July/August 1982 using Schlumberger
2 7/8" Hyperdome guns at 4 spf.
A lubricator will be installed and tested to 3500 psi on all well work.
11160' - 11180' BKB (Ref. BHCS/GR, 6/11/81)
11208' - 11226' BKB (Ref. BHCS/GR, 6/11/81)
11236' - 11260' BKB (Ref. BHCS/GR, 6/11/81)
*11188' - 11208' BKB (Ref. BHCS/GR, 6/11/81)
*11260' - 11280' BKB (Ref. BHCS/GR, 6/11./81)
An SSSV will be set and tested in the ball valve nipple ca. 2000'.
*These intervals to be perforated only if the others fail to sustain flow.
Subsequent Work Beported
on Form No..! Dated
14. I here rue and cor.rect to the best of my knowledge.
Signed __~' %~ ~,o~ TitleD-[.~tr~ct ¥~eld Engineer
The space b~ for C~mis}ion use G.3. Plisga
Conditions of Approval,11'-~rfy:
Approved by
COMMISSIONER
JUl_
Date
Approved Copy
Retume6
By O rdUe~' ot
the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
Indexed
SOHIO RESTRICTED
SOHIO ALASKA PETROLEUM COMPANY
ARCO
TO:..SFO/UNIT/ST:
LL
~ -- I I I I
ao,~ Transm,i~,t~l Only
~O ___ ! - ' · '
3111"C"STREET
ANCHORAGE, ALASKA
TELEPHONE(907) 265-O000
MAIL:POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 11/30/81
STATE: I~-'~ D-c~}
1209
REFERENCE:
/OHIO FINAL DATA - M'17 OPEN HOLE FINAL DATA
F~e following material is bein~ Submitted herewith. Please acknowledge receipt by signir~g a
copy of this letter and returning it to this office:--
SFO/UNIT/STATE: OPEN HOLE FINALS
M-17 DIL/SFL (Sch) 10-27/81 & 11/6/81 ~/la2
M-17 BHCS " 11/6/81 ~/2
M-17 FDC " 11/6/81 ~2
M-17 FDC/CNL " " 11/6/81 ~/2
2" & 5"
2" & 5"
2" & 5"
2" & 5"
DIRECTIONAL SURVEYS
STATE ONLY:
M-17 Magnetic Single Shot Survey 10/8-26/81
M-17 Gyroscopic Survey
Jobf~ 1081-026B
C~ ~ )1 Kri~er
ev 1,op~ Geo
logy
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
December 11, 1981
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well M-17 (23-12-11-12)
Enclosed, in duplicate, is Form 10-407, Completion Report, for
the above-named well together with the Well History, Well Logs,
and Directional Surveys.
This well has been completed as a non-perforated oil well.
Yours very truly,
RHR:ja
Enclosures
cc: Well File #17
Geology
District Drilling Engineer
DEC 1 1 i98!.
0il & Gas Cons.
' ( ......STATE Of ALASKA (
ALASKA ,.~ AND GAS CONSERVATION C~-.~.,.:,~llSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
'-1. Status of Well . ~ Classification of Service Well
OIL E~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] - '.
2. Name of Operator 7. Permit Number
Sohio Alaska Petro±eum Company ' 81-i05
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20628
'I INS~ 9. Unit or Lease Name
4. Location of well at surface LOCATIO
3187' SNL, 607' W-EL, Sec. 01, TiIN., R12E, UPM ' VERIFIED ~ Prudhoe Bay Unit
At Top Producing Interval top Sag R. SST. ' Surf~ ~./ 10. Well Number
3201' SNL, 2374' EWL, Sec. ±2, T±iN, R±2E, UPM iB.H..~ ."l M-J. 7 (23-12-11-12)
At Total Depth -~ ' -' 11. Field and peel
3459' SNL, 2067' EWL, Sec. 12, TllN, RI2E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
· KBE = 52.13' AMSLI ADL 28260
12. Date Spuddedl0/10/81 13. Date T.D. Reached. L1/5/81 14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns11/13/81 feet MSL one
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
1±944'MD 9575'TVD 11889'MD 9522'TVD YES~ NO[]I 2093' feetMD 1866'
22. Type Electric or Other Logs Run
GR/SP/DIL/BHCS, HDT, FDC/CNL/GR/CAL, CBL/VDL/CCL/GR, gyroscopzc survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulate.~Conduct¢~r Surface ±10' 36" 8 cu.yds, concrete
£3 3/8" 72# L-80 Surface 2'128' 17 1/2" 3804 cu.ft. Permafrost II
9 5/8" 47# L-80 Surface 10946' 12 1/4" 1800 Cu.ft. Class G;
130 cu.ft. Permafrost C
-7" 26# L-80 10436' 11932' 8 1/2" 438 cu.ft. Class G ~/18% salt
24. Perforations Open to Production (MD+TVD of Top and Bottom and .25. TUBING RECORD
.
, interval, size .and number) SIZE DEPTH SET (MD) PACKER SET (MD)
,
4 ±/2" 10520' 10357'
None
,
..
26. ACID, FRACTURE; CEMENT SQUEEZE, ETC.
· : · .. ~ .' , ~. , DEPTH INTERVAL(MD) AMOUNT& KIND OF MATERIAL USED.
,..
, .
r.
27. PRODUCTION TEST
Date ¢i~st Producti~:n I Method of, Operation (F!owing, gas.lift, etc.)
·
Date of Test Hours Tested PRODUCTION FOR el L-BBL GAs-McF WATER-BBL CHOKE SIZE GAs-OIL RATIO
: ' ' rs 4~. . TEST. PERIOD ~
, , , ,
Flow!Tubigg' . Casing Pressure . CALCULATED.a~ .O!L-BBL GAS-MCF 'WAiFER-'BBL OIL GRAVITY-APl (c0rr)
·
Press..' .. ...; .~ 24-HOUR RATE
·
28. CORE DATA
' Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. " '
None ..... ~" .'" , : ".
· -"~" '"' , : · ~ " ~.~ .... ' · DECl1198!
· - Alaska Oil & Gas Cons. Coinm~ss~or~.,
Anchora,{j~
, ,; ~ ,. · . , · , .; , ,~ . , · . ' ., .
.
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
.,
29. '' -. :. 30.
GEOLOGIc MARKERS ~ <i.~!:: !~,"~.~.'~ ! ;~);'~..~
NAME Include interval tested, pressure data, all fluids recovered and graviz¥,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
BED Subsea
Sag River SST. 11021' 8698'
Shublik 11055' 8725'
Ivlshak 11944 ' 9523 '
31. LIST OF ATTACHMENTS
WeAl History, Well Logs, Directional Surveys
32. I hereby certify that tt~e foregoir~g is true and correct to the best of my knowledge
/~ Iz//~, Signed '~_0_"~_, TitleD1St_rlct Drilling Date__
BH ._~ R. H. Reile¥ -~ Engineer
INSTRUCTIONS
General: This .form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for 'injection, observation, injection for in-situ combustion.
.
Item 5' Indicate which eleVation is used as referenCe (where not otherwise Shown) for dept. h measurements
given in other spaces on this form and in any attachments.
I~:em 16 and 24'! If this well is completed for separate prod~iction 1from more than one interval (multiple
Cbmpletion), so state in it~n 16, and in item. 24 show the producing intervals for only ~'h~e interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for ~:his well should show the details of any multiple stage cement':~
ing and the location of the cementing tool.
Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
item 28: If no cores taken, indicate "none"
Form 10-407
WELL M-l? (23-12-11-12)
WELL HISTORY
Spudded well at 2100 hours, October 10, 1981. Drilled 17'1/2" hole to 2728'MD
(2700'TVD). Ran 71 jts. 13 3/8" 72# L-80 Buttress casing to 2728' (2700'TVD).
Cemented with 3720 cu.ft. Permafrost II cement followed by 90 sks top job.
Installed and tested BOPE. Cleaned out to 268b'~ tested casing to 3000 psi,
okay. Drilled out to 2758'~ ran leak-off test to Uobb psi/ft, gradient.
Twisted off at 5758' while directlonaliy drilling 12 1/4" hole. Fished and
recovered entire fish. Resumed directional£y dri£11ng 12 1/4" to ±0952'~
Ran 287 jts. 9 5/8" 47# L-80 Buttress casing to £0946'. Cemented in two
stages: First stage with 1800 cu.ft. Class G cement; second stage through
D.V. packer at 2606' with 130 cu.ft. Permafrost C cement preceded by Arctic
Pack. Cleaned out D.V.; tested casing to 3000 psi, okay. Cleaned out float
equipment and directionally drilled 8 1/2" hole to 11944'. Ran open hole
logs. Ran 37 its. 7" 26# L-80 IJ4S liner to 11932'. Cemented with 438
cu.ft. Class G cement with 18% salt. Cleaned out to £1889', tested casing
to 3000 psi, okay. Changed well over to NaCl; -ran CBL. Ran 339 jts. 4 1/2"
12.6# L-80 A/B mod. Buttress IPC tubing to 10520'. Landed tubing with ball
valve at 2093". Installed and tested tree° Displaced tubing to diesel~ set
packer at 10357'. Tested tubing to 3500 psi, okay. Released rig at 1800
hours, November 13, 1981.
DEC 1 1
& sas Cons.
ContrOlled Drilling Consultants
P.O. BOX 1189 '
PALMER, ALASKA' 99645
PHONE 376-5423
Mr. Brian Rose·
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
October 29, 1981
RE: Magnetic Single Shot Survey ,·
Job No. 1081-026B
Well M-17 (23-12-11-12)
Prudhoe Bay Field .
North Slope, Alaska '
Date of Survey: 10-8-81 to 10-26-81. ..... '
-.
Dear Mr. Rose:
· :
Please find enclosed the "Original" and six (6) copies of our ' ·'
Magnetic Single Shot'SurveY on the above well. Radius of Curvature,,::'
was the method in calculating this survey. The depth interval of,
the survey was 1540 to 10,953. ~,
Thank you for giving us this opportunity to be of service.
Yours very truly, ~
Controlled Drilling'Co. . ants
~es Henderson ' ,'
Directional Supervisor
'DEC/I 1981
011 & 'Sas 'Pons. Comr~
'Anchorage
MAGNETIC SINGLE SHOT 'SURVEY
RADIUS OF CURVATURE HETHOD OF COMPUTATION
~OMpLI_T_F~_~_~OR,_~_DC_ BY~ FM .LIN_D~EY .~ A_~_AOC, . ..:___ ....
RECORD OF SURVEY
28 OCT.
K B ELEV
81 '
,52.13
copy
TRUE ' ' '
~tEAS .-DR !_E_T__VE. AT_/.~ U B .... · ' ..--~ 0 R_iF T. :_ :_ ..:~::i.~ O T A~.~ C O~~ES
DEPTH ANGLE DEPTH SEA DXREC D~STANCE AN~g~ DE~/~OOFT
D M DEG. 'D M 'S
,
~.'., ..... '., _ · ,~.: --- y;.': ,... ,. -,:- , ~ .:'. >.: _. ,/:::::?:....:~.;'::::-: ::::::::::::::::::::::::::::::::::::::::::::::::: .~::.. . . ~ ::~ -4..:-?,,:::~.:,.:.:,: :.; ':.::-~ :. :.?:.: :: :..-..::.:: ...:,, 2~ :.~:.>::~;.:~.::?:~>y~``~:~?~:~:~::~:~:~:y:~?~:~:~.~::~::.:~:~y:~:.:x>~:.::. ?~:.~ ~
......... V ...... ~ .................
..
.
15~0 0 0 ~5~0.00 ~87.87 8 0.00W ':' 0.00 S 0.00'W 0.00 ~. 0 0 0 ~ 0.000 0.00
~719-::~:-:0 '_ 1718,78 ::..-1666,65--. 'S3~,OOW :?.7,~1. S ':.:': 2,6.7 W::'::.:'.:::::':7'~9:'S.t::20::.:, 6':.~2-..W-' :'-...; ~,09~'.:..' j: 7,77::::
2000 9 ~5 1997,88 ~945,~5 822.00W ~5.~0 S ~8.01 W ~9.6~ ~ 27 1 4& W Z,42~ ~9.56
2093-12 0 2089,27 2037,~4 $20.00W 51.31 5 24,~5 W 56,71 ~ 25.~2 35 W 2,958 56,68
23~0 ~5 ~0 2299,9~ 2247,8L S~6,00W .::LOO.~6-S ~0,90 W .' LOS,~7.~.S::22:.. 9::1~ W 0,8~2
"2432 16--0 2~17,'50 2365.~7 ~%5,00W::.':~.88 S ~9,6~ W %~0,90:~S"20::'~7:.:: 1 W 0,822
2668 [7 30 26~3,21 259~,08 5 8.00W ~99,61 S 6~,96 W gO9,00 S [7 [~ ~[ W 0,2~2 207,77
2757 18 30 2727.85 2675.72 S 2.00W 226.99 S 64.35 W 235.94 S 15 49 ~6 W 1.313 233.8~
' 2946 22 15' 2905,19 2853,06 Sll,OOW '::291,78 S 71.60 W :' 300,~4 5'":-13.::~747:19 W:'~-:':~::2,~60
3037 25 0 2988,56 2936,~3 $Z2.00W :.:327.5~ 5 78,87 W 336,88- 5::~3~::32:::~28 W '::' >"- : 3,028 33Z,82
322~ 30 30 3153.79 3101.66 S13.00W 41~.09 S 96.69 W ~24.26 S 13_10 29 W 2.715
33~9 3~ 0 3259.~9 3207.~6 S13-00~ ~78.07 S 111.70 W ~90.95 S 13 9 3 ~ 2.800
3597 42 15 345~,91 3402.78 516,00~ 62~,00 S 151.85 W 6~3.19 S 1~ 39 2Z w - 3,~29
.... RECORD , O!= _.$UELV. E¥ :
.... ! . .{?]: . ' . ' .'..~ :. ~ .- ~, .... - ~'
....................... TRUE .................' ........ -:~-, , ............. ',,; ............................. , DOG __
MEA~, DRIFT VERTICAL ~UB DRIFT TOTAL COORDINATES C L 0 J U R J ~ JEVERITY JECTION
DEPTH ANGLE DEPTH GEA DIREC DI ~TANCE ANGLE DEG/iOOFT D I~TANCE
m_..M n~. , ....... O M ,~$ ..... .._ .
.. . .. :~. -
: ~13~ 45 15 38~2.78 3790.65 5~6.00W '98~.92 5 25~.~9 W' "'ZOl~e29'::~;'S(:'l'~;:30' 50 W '
~906 ~5 %5 ~385.08 ~332.95 516,00W 1510.08 S 405.6~ W 1563.62 5 15 2 10 W
5315 46 0 ~671.11 ~618.98 516.00W 179~,10 5 ~86.22 W 1855,92 5 ~5 il 16 W
....
63~0 ~6 30 5378.35. 5326.22 ':: 5ZT.OOW ,250Z.55 5 699.9~ W ..: :,'2597.63~:'-:5.-'{~5'.;:37 54 W
: 6802 4~ 15 5702,86' 5650,73 $17,OOW 2815,98 5 796,07 W 2926,3~".S?'15"~7'-;"7 W'
~100_~_4~5 5.91&;3. ~ 8.6.4.,~~,_~Q~A~,~3__5 ........... 85 6,8 6__W ~.13~_,~~~.~3~
7597 45 15 6269,28 6217,15 516.00W 3350,31 5 956,2~ W 348~,~0 5 15 55 46 W O,g2~ 3~53,91
8108 ~ 15 6641,40 6589,27 531,OOW 3670,42 5 ~095,42 W 3830,~0 5 16 37 3 W 1,497 3802,97
8938 44 15 7251,50 7199,37 $35,00W .4143,46 $ ~399,7~ W 4~73,5~:~&~:~18;~'39~57 .W 0,48~
~ 9231 44 15 7461,38 7409,25 ' 535,00W 431'0,94 5 1517,01 W 4570 ,07.~'; &'.:.19 7:23 12 'W 0,000 4558,43
10293 ~2 15 8235.00 8%82.87 540.00W ~885.86 5 1962.40 W 5265.23 5 21 52 58 W 0.2~9 5263.19
10893 40 0 8686,93 863~,80 &46,00W 5~74,32 5 223~,39 W 563~,95 5 23 Z9 ~0 W 0,558 563~e93
0,5.59 3.001,90
.O~,_O~.Z ...... 13/+_9_,]'~ .....
0,090
0.183 1836.53
0,000 2.573,31
0 '~+87 ' 2900.00
Q.._O_O0 -.-'- '. 310
THE FOLLOWING INFORMATION IS EXTRAPOLATED TO TD ~
j 1__09.5_3_~ ..... 0___8_7_32..9_0 ..... 8 68_(1,3_? .... .S_/+_6_,J~O~L_ _52._O~l..,.1L_..5__2259.,.L3_W ......... 5.6_7.0_,~.5~~0 _. W .... O_,O_O0____~.S&TJ3.,_.5~.
BOTTOM HOLE CLOSURE 5670,56 FEET AT $ 23 28 40 W
SO~ZO. WELL M-17 .. .... ~
_-_ ~-l-_ _T~N~IHE~TA FOR ~VE~Y_EV_F.N_iO0--F~I~OF~&~EA-4;JEJ~-~= ........ ~'' ........
OCT. 81
MEASURED. 'i:.: ;. VERTICAI.'-;SUB'--.'-MD'TvD ii:!ii~-i.'.il: ~:. VERTICAL
DEPTH". ' :~ :..-- ::.:,;i.i-iDEPTH; '~SEA. DIFFERENCE?i? ::':i"i CORRECTION
152
352
~-~ 452"
652
752
, 852
952
1052
i.__.2_~52 ....
1252
1352
1/+-52
'1652 ·
J,3.52
1853
195/+
~ 205.5,.,
2157
2261
2/+68
2573
152, 100 0 . 0
1852. 1800 0
1952, 1900 1
2052-,----2000 .... 2
2152, 2100 5-
2252, 2200
2452, 2~00 15
2552, 2500 20
26-7-7 ........ -..2652-,-----2600 .......
.
2785 .:.-2752, 2700 30'
2889 ":':'2852, :?~'2800"'":" '36
299_7 .......... -'!i:-295Z,.__'_2900. A/+ ...........
3108 3052, ~000 55
652, 600 0 0
752, 700 0 0
852.~ ......... 800 ~ ..... ~
· 6
:1052, 1000 0 .:'!~:i":, 0
:_l.15Z,: ,. ' !100.-.:.,.,.. - 0 ..... '::~ :..!.:..-:. :-~ ..... O
1252, 1200 0 0
1~52. 1300 0 0
.1A52-,------1~-0.0 0 ............ 0
1652 · -: 1600:-':!~i:::':!:~:~::!:'0 '-!':!i :' ~'~ 0
0
1
3222 3152, 3100 69 1
.______33~.0_ 3Z52., ......... 3200 _a 7 ....... . -= -- --1
~'-= ,3463 3352. 3300 110 2
- 3593 3452. 3400 14.1 3
~iL ,- _A729 ........ _A 5-52.~-...----350 O. 176
3
5
5
5
6
8
1
4.
,
3
35
17.88 S 9.37 W
28.90 S 15,20 W
44..e-25 _~S ......... '. 21 _-~Z-3d_ ..
"' ':" 6/+. 5 2..i s ::.:i~ .~iil;:;iil.i~i~;? 2 ts. 9 6 :',:.: w
88.~7' s !::-':'~::t!i!i:~.';:~i ~'?. 24.:, w
141.60 S 52,06 W
171,39 S 57.77 W
2n~30 ~
358,15 S 85.17 W
412,10 $ 96.~7 W
542e54 S 128e23 W
622,~3 $ 151.11 W
SOHIO. WELL M-17 SINGt. E SHOT'$URVEY
ME~$U~E_I)-DER-TH- AND.-O.Tt~IER_ _I)Ajj~~_F_V_E~.0_EE~T_O.F__S_UB--&F~--DEP.T-EI-: '
28 OCT, 81
MEASURED VERT!CAL SUB MD'TVD VERTICAL
DEPTH :DEPTH SEA DIFFERENCE CORRECTION
................ .~'
TOTAL COORDINATE5
.,, 3867 ~652, 3600 214
~,nn A .3752-~~ ......
~147 · ~'3800
'" 4289 95 · ' ':',~:?:-~' 3900
4574 4152, 4100 42'2
4717 4252, 4200 464
5432 4752. 4700 679 44
5576 4852, 4800 723 44
~ _~ ._i ~.' :'.i!""?:~:'i:'~2~ .'"~'~!'~'i:i'~ ~2o.n '~,~;':!'~!?;?!.:?;!::i;-:-~~-~:' .~_ ~,.5.
6302 5352, 5300 9.49 45 '
6~90 ..... ;.: 556Z, ....... ~5.0_0~33~ ....................... ..
'-:f~:?' 6731 5652, 5600? 1078': ~""':~'" '
~,'~. · .,~ .:
687[ 5700-~'~: [[[8 ~;? ~0
-' .-.:.
7150 5952e 5900 1197 39
7290 605~, 6000 1237
1872,03 S 509,60 W
1971,72 S 538,86 W
2 072~.19--5 ........... 56&,-86_-~
217Z,75 S 599,41 W
2273,33;$ 630,16 W
___L23..73J_91--$
2475,13 $ 691,86 W
2575,23 $ 722,46 W
...263_3_,
2768,43 $ 781,53 W
.: ~.-' 7572
'~ ;'-:':':!ii:~:~ ;..... -'. .' 77! 4
· ,;.:-:/:.: i?--..~ ?.~?"
7988 6552. 6500 1435 36
8122 6652. 6600 1~70 35 '
;;'?: esgo .-:'"-::-~':>68~2,"-.: '."'68oo'/;;~:~"'z~se';::/~:'?'';;':''-''';~':':':~ '-' ;~s5 - .. se~o,'~:,~'s zzes,z~ ~
'::~-"-~ 8526 -- :.:~"6952e.:~:"::',?~:~6900'~:::1573~'??~:::~r?:~''':''.' ' :'35 ::' - '3908,02~ S 1242,17 W
2861,87 S 810,10 W
2.9.5_~,3_.8--& .83.8JSD__W
3048e24 $ 867,04 W
3142,33 $ 895,37 W
31,A-7--~
3333,26>S,.:~:~: 951,33 W
3428,68':'$ " 981,20, W
3601,24 S 1056,10 W
36?8,33 $ 1100,18 W'
SING bE--S HOT--$U R V F..
MEASURED DEPTH AND OTHER DATA FOR?EVERY EVEN 100 FEET OF
SUB SEA DEPTH,
28-0CT, ..... 8't
TRUE
..... : ......... MEASURED
.=_. DEPTH DEPTH SEA DIFFERENCE CORRECT[ON TOTAL. = COORDINATES
" 8800 7152, 7100 16~7 38 406~,50 S 1345e35 W
.- 8939 7252, 7200 [686 39 ~143,96 S 1~00,09 W
/:.:-::.:, 92~8 . . 7~52,~ 7~00...~,L:~765..-~:~:_.~..:?."~:'~ . ~9 ~03,51 S. 1511,8l W
~96 -.:. '-=..~
963~ 7752. 7700 1881 38 ~536.52 S 1681.88 W
9772 7852. 7800 ~919 38 ~611e~6 S ~7~9,6~ W
" 10~50 8352. 8300 2097 34 ~965.60 S 2031,17 W
10584 8452, 8400 2131 34 5030.90 5 2090,45 W
~ 5153.92 ~ 22~0,~5 W
: : DEPTH · : ,,;: :--:i/.'. - -L-'-: DEPTH' ?~:':,/;:::' SEA ""i"' :'-:i':!'TOTALs?:' COORD ~NATE$ :.;:' ;::--;.:-'i"~'..:':.i~'t..:':;.' ?i;!.;~!!:??::rli:.!;';~;~:~!!;:'~!i!:!:'?"' '>'i::';i.':';: ~:./.":: '?:."i:!'''
...... ; -_ .......... : .....:.. ......... ~.:..._: ....~.::....~, .. .. ~ ,;.:,...~ ~::: ....... ;_ -.._-,- ...... ~.~ -~_ :~L~... , ~?.<-;J:~;..'~ :;~::.::_~s~;;~ ~.L,~;,:~:;.:-~., ~L~;.:., :~.: .~ .::..:.. .......... '-.. ': .....
1000 1000, 947, 0,00 S 0,00 W
2000 1997, 194~, ~.~0 S 18.01 W
7000 5844, 5792, 2948,10 $ 836,46 W- ~.-"'
8000 6560e 6508e 360EteO0 $ 1059*90 W ~ ' "'-~'
....... . ........ · ..... -, -..,,r .......... ..~-;.... ...... ., ,.:~,'~.,.~,,.~::~::,.~.~:?~:-;..~:~r~'.:s: :-~:~s~,:~'r;~:.::<~... , .. :... '.- ....;.:?);:!':-.. ~?;,';:'L?~:',...: '. ~-..,.:' '.: ...:'-". ~." .~;...~r.:~h~?..;r;..~f~:.~;~;~:~]~&~:~:j?y~~}j~::.:?~:?~?::t??~4~:~::?~.F~.~~''.;~.t:.'?:~t:~j;?f'':'..':: '".,-' .,' ~. -' ~'
:.:?:.?:r.~??;'_?-..-?::- ?-."h:_:,~:.>1:~?~:4.'~: ::.: :';;-:--';?;:.'.?:?;?-t"?~??~?:??:':?: ':~;::'":".-' .r:?'..;-; ~.:~.:?..:?;:???~;~.~:~::;~?~:~:?:~?..?~:~.::~:r:..L:..~.~;.:..::.:~:~..~.~. ,:~.~: ':.." . .' -
spepp j-sun
Mr. Gary Plisga
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
November 23, 1981
Re: Our Boss Gyroscopic Survey
Job No. Boss-16928
Well No. M-17 (SEC1TllN R12E)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: November 19, 1981
Operator: Tom McGuire
Dear Mr. Plisga:
Please find enclosed the "Original" and seventeen (17) copies of our
Boss Gyroscopic Multishot Directional Survey on the above well.
Thank you for giving us' this opportunity to be of s~rvice..
Yours very truly,
NL ,SPERRY-SUN, INC.
Ken Broussard
District Manager
KB/pr
Enclosures
CO IDENT L
DEC1 ! 1981
Oil & Gas Cons. Commiss~or~
Anchorage
SOHIO ALASKA PETROLEUM, COMPANY . .~_~.: .... ~-. ............. . ....................~O~S 6y~.oSCO>Z¢ ~URVE-Y :
M-IT (SEC 1 TllN R12E) ' CONPUTATION DATE
PRUDHOE BAY NOVERBER 23e 1981 dOB NURBER BOSS-16928
ALASKA KELLY BUSHING ELEV, = 52,13 FT..
MEASUR ED
DEPTH
1200
1300
:':-1'0 O'
.
200
300
500
6 0'0
700
800
900
lOOO
llOO
1500
160.0
1700
1800
19 O0
2000
2100
22 O0
2300
2~C0
25 O0
2.600
2700
28 O0
29 60
3000 2952,83 2900,70 2~ 32
VERTICAL
DEPTH
2672.70 2620.57 18
'2767,30 2715.17 19 32
2860,88 28-98,75 21
S 5,79 W
S 6.60 W 1,3~ 251,50 S 71 -~ W
S 10,39 W 2.5T 286,35 S 76;70 W
258.02
291,80
u 19 s 26.30 E :~-~ ~ .65 3.08 s z.56 w
0 lO N z~6,e9 E~ ~ ,~1 3,23 S
' ~. '.':. :;~'~:~::'.":;.; .?' ;.-.'~'"':~-:'~..--':9....:.E '::~;~:-:'-~:;;;:;:~;;i:-~?~;~::;~;~:;;~::~;:~:;~'::,~:~:3,3 7 S"
:' ' 0 "'. ;' 1 6':'':::~'~::' ..?-' S~':-' 5 ~'.e:~.:- ./.;'. ' .~'L:'.~:;;~:' ~;;' '~;; ~;~:~:..F¢::~:~i;:Q¢~;i?:~.:::~:-:;~ ' ....
.......0~6 ~'-~'S"'"' ....................... ~.89 E~-;~'' ............................ _ '~s 5;02 s
2 20 S 37,60 ~ ~.8~ 7.31 S .9~ ~ 7,02~
~ 13 S ~2.69 ~ 1,9~ ~1.6~ s ~,69 ~ ~2,5~
TRUE SuB'SEA. ::.....
v~,'¥'i~:~L:.~N"-~'EJ."~'A-T-~:'O"N' ...... ¢~E~~E:'A"I"~'~' ....... :"":"A'~"C-TA:NGU L'AR .... ' Co'OR'DiN'A ~E'~ ............. v ER J l CA L
DEPTH DEG HIN DEGREES DEG/IO0 NOR.TH/SOUTH EAST/WEST SECTION
~-~; ~ -. ~y; ~ ,- -' -':o--:.~:-~-~-~.-'.'-- ....... -s~-:'2~'-';.'~:'~'~'~"~'~":'"::~''''' ........... .:~:~.::~.:~::~.e:~..::~::~:~.?:~.~.:.:~..~.?~:~.::~.?.~T;::~:2%~:::..~..;::~?.:.:.~.;:;:~:~..:.~.~.:..:.~.;~.~`d~.:~.~.~.~'~''~:'~':''~'::~:':'''''':'':'''~'':' z. ~
399 99 3~7,86 0 23 S 5,39 W ~ .13 2,15 S 1,06 W 2,~0
s , s
......
~,~';'~'~- ~'4f;"~ ~' i~'" ............ ~~O"':~W:"~":'":~'~':':':';i7~' ................. "~ ...... ':"~'~;-0-~~'''s ............ "'"'"':""'"::'"i'":~'g:~::W:''':'',''''''':'''''''''' .... .....
999,98 9~7.85
~099,9~ ~047.85
~ 1'99' 98 '
1299.98 12~7,85
1399-9'8 ~ 3~7,85
z~9~.97 ~7. s~
1599,92 ~5q7, 79
~699,75 ~6~7,62
1898 *65.::;'~'' ~'~::
2192,~9 21~0.36 1~ 26 S 20,29 W 1.36 8~,~2 S 36,28 W 91',8~
2289.21 2237,08 1~ 58 S 18, O W ,79 108,*0 S ~,60 W 117,08
2,~ z.':~
2577',~3 2525-30 ~7 ' 8 ' :"'<9"~:~ ....
o ~ UM
M-17 (SEC 1 TI1N R12E)
PRUDHDE BAY
.._A_LAS KA
:.
COMPANY
TRUE:,- -"' '--SUB-asEA
MEASURED VERTICAL VERTICAL
DEPTH ' DEPTH DEPTH
:':i ~~!:':::...iiii:ii'::::;~:":i::~!;i.:i!~:i!:.!ii~!:i!.ii~iii!:D'~ATE.' OF" .'SUR:'VEY...":.N. OV£~:MB~:~.!....19q~ ! 981 -
COMPUTATION DATE BOSS GYROSCOPIC SURVEY
NOVEMBER 239 1981 dOB NUMBER BOSS-1&928
.... KELLY BUSHING ELEV, .= 52,13 FT,
- .:.~ ': ::~: :;:. ~.:..~."~..:~:.~:~:~.:."~':.~:::::~:-~:~:.~ ~:: ~ER~AT-OR:~:~'~T:HOM:ASj~:M:~Ui~R:E.::~:.:.:.~L.~'~:
c°u" :'
~NCLINATION D/RECT/ON SEVERITY RECTANGULAR COORDINATES VERTICAL
DEG HIN DEGREES DEG/iO0 NORTH/SOUTH EAST/UEST SECTIOn'
3100
3200
3.300
34 O0
350~
o77.88
31~2."G9
3296.77 3244.6/+
3375,50 3323.37
....
36 26 S 16,3~ W 3,15 521,71 S 133,13 W 528,84
39 40 S 15,69 Wm 3,26 58'0,95 S 150,15 W 589,69
37 O0 35'22' 59/'-'-'- 347.0,':46
3800 3593.70 '::. 3'541,57
~.000 3734.93 3682.80
~1 O0 3805.G2 3753.49
4~ 3875.9& 3~23.83
4300
~508
46 O0
A700
-39~5.06..'-':: 3893.83 · -
~i56.52 4io~.39
4227,10 ~i74.v7
~.3___1.{)_. ~_!,5_~_8.9 U 3-_51 .... 644.60' S 168.17 W 6§!~.9__7_
45 q S 16,10 W ,13 982,98 S 264.82 W 1002,34
q5 31 S lG,19 W
..... · ~7 · i05[.25 S 28~.59 W 1072.5~
.... ~'-': "· - -' -'" ~ ---'~-~ ' -" "-' ' '""'"""'"-'" '~' -"-' '- '"~ ', ..... ,, · -' - · ri ~ -~,, ~ ........ - ~. - ........ -.... .- - .. , , ,.., ....... .. ,- .., ·
45 10 S 16,19 W ,39 1324,93 S 3Gq,~g W 135~,24
45 1 S 16,89 ~ ,52 1392,8.4 S 384.66 W
4800 4297.69 . 42~5.56 45 10 S 16-79 W o16 1460.63 S ~05.20 W 1494.3Q
~ : "':~ ' .: . ': - - ?-:'.:-.~/~. ':'f:;:~:~:: ';:::f~6J{.~ ',' :&:::~f:?~:"':~:~.J;f:~;':'?'~'~:!g~:~:~f:g?,~:.f.:~;; :. ' .:-;.~{-:.::'~:: ."' ':. ~. :-;~'" ;~" · ~"' .'":{?~;? ?;::: .:~;: 7' :". ':..; ': ';: .~,;;?,:{. :~ 'i; .:-;~(~:~.' :i '~.
......... " ~ ............... ~'-'~' '~ ....... ~ ";'"~' .... -~-,~:.-=c~-:'~":':::":':';::';":':":'":'""";':;;";':':;'.:'-..:.,~' ":~' ' ' '~,' .: l, ' · ."..'..'.'.-". -'..:.~..~.'~-. .... :.-.- ..... .- '... ~...,~.....,;,.,..,.. -
5200 4579,31 4527.18
5300 4G49.18 4597.05
5400 · 4718.65 4666,52
:':: 55 0----0~: · 4787' 96::;: ../.:il
5600. :; 48 57- 0:'5~. :
5700 4925"89 .:: ::~'::~:':'~873:~7~. ·
58 O0 4994.62 49~2,49
5900 5063,58 5011,45
6000 5132,42 5080,29
45 23 S 16,29'.W ,32 1732,80 S 486,53 W 1775,31--
45 57 S 17,29 W ,91 1801,28 S 507,21 W 1846,08
46 I S 16,29 W ,72 1870,14 'S 527,99 W .1917,25
46 32 S 17,19 W ,06 2147,37 S 611,50 W 2203,69
q6 15 S 17,29 W .30 2216,5~ S 632*98 W 2275,q3
~6 ~ S Z7,29 W '.~7 2285-79 S 65~,55 U 23~7,28
0 ALASKA PETROLEUM cOMPANY : : ;' :..~:..;:i:' !i~iiDA'TE';OF SUR:VEY;:N'OVEMBER:~lge 19
S0H
PRUDHOE BAY NOVEMBER 23, 1981 dOB NUMBER BOSS'16928
ALASKA KELL~ BUSHING ELEV~ = 52~13
DEPTH DEPTH DEPTH DEG ~IN DEGREES DEG/IO0 NORTH/SOUTH EAST?WEST SECTION
$.00 5q, 07o68 ' 5355.55 46 0 '' '-: S ;'17: '2 9:' "U ' ~ i' " :!;iii: 'Jl'~ i~;":74iO:"25;'";"WJ!""::~:i'""J:::iL' '265~'°70
.................. .... __,~_,. .............. ..,:,....,.:. ..... '""4'5'" ..... : ....... "26~:1,'~9 '~'S'':~: ': :'" .......... 761':;-5'6'"'"U'""'"'~'2Y'
~500 5~77.~2 5~25.2~ ~5 S2 S i7 2e U
~GO0 55~7.61 5qg5.q8 ~5 17 S 17,2g'~ ,25 2699,50 S 782,7~ W 2776.25
6700 56~8.A2 5566.29 ~ 32 S 17,10 ~ ,77. 2766,95 S 803,62 ~ 28~6.~9
~~~ ~~- ~-.~. -...:~.... :: ....... : ..-.~.::~-.::c{.-..:-:<,:...'.. ',.:~.:.:.:.~:-{ '.xl,.:<..' '~':=~' -' ' ':~:.' '-.~:{.::.'-:?.':'~::'~.:):: ' · '":'?'" :' '.:,:.~J<':- '~f~::?:S':'?' [~{:';
....... - ' 7.' ~ .... : ........ ~& .- ..... , ~ · ......... S .:.:17 ,.? ?,. 0~,....~...,:,~,::~,~.,.~.:..~,.~...~,....:::,. ......... ::~...~:.::,:::~.,~.~: .......... ~ ................ .:::,.,..~.:~.,'?:..~. ............... .~..,.:,.-.,.,...?~,?..?~.~::~,::..~.:..,,~..'...~..
:~ ~, :~.: :, ~' '.-; .~: _,. ;~:.,=~A:~ :.',c~ ': T'?::: "-:', ~ ~:;'.~",: '~ ~ ':/,,:':,:' ;;~:~::S ~;:~;~7~:.~:107~:;~;~.~'~;~:;~:;~:~:~:~:?~2;~~:;~?:2900"3 9:' S:~;::~:::~:~:~..~:~:~8~.~::~5~5::~;~::~:;.~;::~;.~::~;~:~;~::~ 2~8 ~ · a ~
70 O0 5833'. 19 "'. :" 57 81, '0'6 .; '~: ~" 19 ~:~:~S:~;~.~;7~;29~.~W~?~:~:~:~:;:~.~;~?;:;~??:~;:;~::~;~??~:~?296~:7~'~15~ S :'::~?:::,:~':??~:/865'~'~217'W~:~:.~? '{ ': 3053,58
7100 590~.q3 5852,~0 q~ ~7 S 17,10 W .q9 305~-18 S 885-96 W 3123-07
7200 5975.3~ 5923.21 ~ 53 S 17, 0 W .11 . 3101.60 S 906,6~ W 3192,89
7300 60~6 15 599~ 02 4~ 56 S ~6,69 ~ ,22 3~69.18 S 927,11 ~ 3262,76
e ~._.~ . .... ............. ~ ..:,. .................. . ...... . ...... .~.::..-:,,.,:,. -,, :~.~:.?.:~,:~:.,~..:,...~. :.- :,' ./. -. -?;:..:...:i,:.~..i ::..~..:..:,..:.i. '.~. .:::t.:.'. .~:~..: ' ::::::::::::::::::::::::::::::::: ' - ~e 7 ~
....
--6327.96 6275,83 q5 9 S 16,60 a ,39 3q~l.e~ S 1007.~3 W
7700
7800
78 50
79 O0
7950
8O. 00
6398.77 63q6.64
643q.62 6582 o ~ c-:-:J
R100 6619,96 6567,83
820§ 66 94,3'q 6642,21
8300 6768,14 6716°01
BqO0 · .68q1'73 ..... '- 6789,60
8500 69146.9q '-' 6'862'81
8600 698'7.32 6935',19
8700 7059,23 7007,10
8800 7130.92 7078.79
RgO0 7202.09 7149.96
9000. 7272,8~'~. .: -:::.72.20;.7!
m
.
qq ql S 16,69 W ,q7 3509,09 S 1027,66 W 3613,19_
q3 qO S 19.50 W 4°39 3542.21 S 1038,q8 W 3647.7(
'4'i .... b'"::U ...... ' .......... :" ................. .......
42 ~5 S ~0,89 ~ .62 '37A7.61 S ~15~,00 ~ ~881,5~
~ 2 S 31,89 W -1~ ~6~0-01 S 1327,97 W 4221.q0
4q 20 S 32.79 ~ ,70 ~098,90 S 1365,28 ~ ~290,56
:.45 1 ;:" S:::~.~3:4::.~50~:'~:~:~:~.~2{::~:~:~:{:~~
M-17 (SEC 1
PRUDHOE BAY
SKA
MEASURED
DEPTH
· ' :- :-': :::: .;'~i:-": /:"i": .' '.~ '-:;-::'i:..':i-i:"!i' ANcHORAG
OH!.. 0 AL'ASK A P ETRoLJ_E:UM.":.;C...OMPA'NY .' .' .::~::~. :~...::"..::'~:~.~: ::::::::::::::::::::::: ,...
TllN R12E) COMPUTATION DATE BOSS 6YROSCOP~C SURVEY
/ NOVEMBER 23e 1981 JOB NUMBER' BOSS-16928
T R U E .::.~.. "~ .:.;:~:.::::...:~...~. U~_~ S__E.~ ~.'.':~?: '. 'couRsE
VERTICAL VERTICAL ~NCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
10000
10100
! 02 O0
I0,300
10500
10500
10600
10700
10800
~ooo
1.1100
11200
~oo -' = ?,, ;s'~"5:!811":~ i:~ :~:i:~.~?:??~ ~ ~+i!:':,, 5 i'~? ~?+,+.~:i:~: ...",,; :z '..:';i"':"C s !~'~;~: ~i~i~.~;~ ~'~'i~ii ~::?...~ ~ ~
9~00 7557.68 7505.55 ~ -39 S 35,89 W .29 ~6.19 S 160~,~9 W ~706,59--
9500 7628,98 7576,85 fi4 22 S 56,29 W -,~0 4502,85 S 16~5,80 W ~775,~3
.~6QO .... ~Q_~_O ...... 76~6~ _..' ...... ~_ ~_7 _~ 3.6~9../~ ,68 ~558,7~' S 1687,23 W ~8~~
97 O0 .::' 7:.~'73 ' ~1.3::~:.:~; ~~ ~~~ ~'~:.:~ 9-i I. 19
~'oo:LT~:~5~:::5°?;~'~:'~:~-:~:'~:.:~;:~:V'~:~'~:~:~?~:~:~'~.?~?'''~:~/-:'.-::'':?~:~ ~.~::~::'-:'~Ta.~
8061.11 8008,98 q3 58 S 38. 0 W .~5 ~833.61 S 1898.~6 W 5182,21
8133.69 8081.56 42 56 S 38,50 W 1.10 4887,63 S 19~1.0q W 52~9.20
82 o7 :zs- ,.:...'? 8i~2:~:~ ? ~ 2.: .. i o;-/C~.:.:'~-~'~:~?e~W~ ~;~e~~9~e~;~i~s~?~~~2~~?~:~; 53 l~
.'~8~1 ~:~1..?.:.:~:~::.8 ~,-:28~ :.:~;... ~:~-" ...i:.~: ..:;?:';~::~'~ :~~:~:~'~:~i.'~87~ 2'~0:~:~'~~?~-: S~o. l~
83 55" 55.~:::::~:;::.?~:?:8 ~ 0'3:','22'-::~:~ .'.:'.-: :-.~ 2:-.'.~'22.::"::::~?~;:?:$':~?~:~'3~?~'~::' :~:"i::8~:~?~::.~5:0:.~'~:~;S0':::~S~... :'~:~5~;:~::.~:~:~;;.::'.;' 5~ 5 · 38
8~29.51 8377.38 ~1 53 S ~O, 0 W .68 5096,16 S 2111,32 W 5510.33.
850~.36 8~52.23 ~1 10 S ~1,50 ~ 1.22 51.~6,39 S 215~,60 ~ 557~,19
8579.97 8.527.84 ~0 3~ S ~2.39 W .8-4 5195.06 S 2i9e.3{ w 5636.8{~
8:7 3 S:"': 3 27/~.:?::;~:~ :.?~?:868::.I?~1~9:::~::.' - ~ 8 · -:~.'::. ~ 2 ~;::?~:~: '~; ~::: ~:~:5~'
8895.95 88~3,82 32 29 S ~9.10 W 3.12 5561,69 S 2377,11 W 5863,65
THE
11300
11500
11500
11600
1 17 O0
11800
11900
1 1955
8981.53 8929., ~0 29
9069.29 9017.16 27 27
915 8-' 9 3:'!i:':. !: ::.i~...::... 9 lO 6..8 0-.. :~-:: .,.
92'50;,25 ..:.:.:.!: 9198' 12: 22:: 53
9 3 $ 3.19 .":.':¥: '...-:-:9_,~_9 i. o 6-"
9~7,71 9385,58
9532,97 9~80,8~ 17 ~2
S $9.89 Id 2.73 5395.29 S 2~+16.q2 W 5910.76
.~_~50,50 W 2,35 5525,95 S 2.$53,21 W 5954,15 ,
S q9.89 ~ 2.70 5523,59 S 2572,86 W 6093,39
957q.89 9522.76 17
CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RAD[US OF CURVATURE METHOD,
S $9.89 W 0.00 5551.81 S 260&.37 W 6133,17
" i :.:i; : ': : ,RNCHO:RAGE"~/ .::' ·
IO A KA PET.ROLEU", cOMP A
.-17 (SEC 1 TllN R12E) "
PRUDHOE BAY NOVEMBER 2~, 1981 UOB NUHBER BOSS-16928
ALASKA KELLY BUSHINS ELEV. = 52.15 FT.~
: : ~ .;;~ .~.. :: . . · :. ~: ~.: ::....: ::....: . .; ~: ::?~ ~;~.'.:':~::~:~'-.~.:~;: ::~-~ :: .::~;:~¥~?:'L4:::: ? :-~.~ ~:.;:~ ~?/.~;?~;;;:~;?;::? r~:;~: ':~:~P ERATOR-THORAS~'~'d?.~;?R~GU:[ R E..
TRUE SUB-SEA TOTAL
MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH :::.:: ::,
1000 999.98 9q7.85 3,08 S 1,56; W ,02 ,02
2000 1997-z+6 191~5,$3 q2,94 S 21..q7 W 2.5q 2,53
~000 2952.8~ 2900.70 32~.87 S 8q.~O
~.~.,.: 5:0 oo:'..:::: ;~: :,:./:~ s~..:5~-:': :~:~.~: ~ s~:~ ;~"0~?:'::::
9~00 7272',8~ 7220,71 ~216,23 S 1.~3.31 W 1727,16 272,50
~z~ .'~- ~57.:~'s9::.:.: 9522.z6:: :.-..
; =::,:::, :-,.~,., ,.;,, ,;, ..-c,..:,,:...~.~,c:-,.:,:.c:. ::... ~.: ..:,,~.:: :...-,~:...:.....:-.;,.:.:'- .' .. -: .. · .,:.. ~ ~..: .- ,:, .. :::::: :,,-. ;- ..:... -. · :G, '., ::,.,: : ..';~"; ::": ' ' :'; ~:'::-: ~: ". -:~:: ~::":" ': ' '~":':~' : '
THE CALCULATION PROCEDURES ARE BASED ON THE USE ~F'THREE DIMENSIONAL RADIUS OF CURVATURE METHOD,
'1
:':. · ..:' ' .... -:i--::':: ..'_' :'-.' :: :'. ::.' '....-; ..::::? :.:':'-..~::A::N ~H:~RA'G-.E:',"ii~:iiA:~i~~ii:i:iii ~i!~!!i::~.i~!~.:i~!!:..~i~!.~i:~i!~.~i:~ii:~i:!~ii~:~ii::~:..~i~:.::?~:!.:::~ii.~i!..~::!~:;~:.~:::.·' . t
P-17 (SEC I TllN R12E) COHPUTATION DATE
PRUDHDE BAY NOVEHBER 23, 1981 dOB NU~BER BOSS-16928
L KA .. ......................... K~LLY BUSHING ELEV. = 52.13 FT.
TRUE SUB-SEA TOTAL
~4EA SUR ED,. VERTICAL VERTICAL RECTANGULAR -COORDINATES HD-TVD VERTICAL
-. D E P T H': .:; ~..:::.:::-'."::::::: D EP T.H~:i.~'?. ::.:;i'i:::~i:i'.'~:.::: !:!!i~:eE'P":Ti~'::i;:'~:~:ii'!iii~i.i:'!i-.N O'RT~H'! $ 0 u T'~';:::.:!:ii!:i::.~;;iEA:.s iT~: i~ ':.:
5~ 52.]~ 0.00 .0~
152 152,13 10'0.00 .58 S ,61 { ,OO .00
~' :- 352--.. ~ ' .,352:'i~:~::::;::::,:3:o.0':'o-.o::::,:'...:.-... ':. '-z'83
I
752 752.13 700,00 3.59 S 1.33 { .01 .00
..... 8_52 ..... 8_5~.,~ ........ ~0~_,.~ .... ~,.33__~. ~ · ~ q ~ , O~ · O O
1
1252 1252.~3 ~200.00 3.23 S ,.
1352 1352.13 1300.00 3,55 S
,,
SOHIO ALASKA PETROLEUM CoHpANY .: ':.'...::.:::~::/~!:!i:~':i:!iii:~!~!::~i~..:~?i;::'!.~!i!;!:i.:~iiil i:~!!:I ::TE~ii~::iO'~:ii!jii:~U:iRV.Ey:j;:i~iNOVENBER:.:i::.'I:9e 1981
? . -.~~T~;..~.:~::.:.DAy.~.:~· .......... :~:~ ........................ .~:.: ............... ..~:.:~..... .......... ........ : ....... ...........
"'17 (SEC I TZiN R12E)
P~UDHOE BAY NOVEHBER 2~ 1981 ~OB'NU~BER BOSS"1~928
ALASKA KELLY BUSHING ELEV. = 52.1~
TRUE SUB-SEA TOTAL
HEASUR ED VERTICAL VERTICAL RECTANGULAR 'COORDINATES HD-TVD VERTICAL
DEP TH: .. ~..':. :? i:: 'DER TH'i:i:!:.:~}~:..i!::!i::~i:ii:::i:i.i!ii::.i:'DEPTHi::i ::~.::i'!i-i :::: NO-~T~H~T:H~!i!:!i:iii:.::ii:~:ii~i~i~:.~:i~i~ilD~:i~~ ~~.
lg5~ 1'952.13 lgO0.O0 35.90 S lB.60
2055 2052.13 2000.00 52.87 S 25.26 ~ 3.57 1.GG
2158 2152.13 2100.00 7~.69 S 32.69 ~ 6.20 . 2.63
· 22 61 ':2252 ,~'l ~ :2 00 W 0~.:: ::.~:: ~: ::~: ~?:g'8~:~'~:: '.-::.~ ~::~::::~:~ ~:~.~-;5~::~ ~.~:~'~4~:':~:::~;;:~:~:.~{~;~:;~;~5~
2~78 2652.i~ 2~00.00 212.57 S ~7.25 ~ 26.21
278~ 2752,13 2700,00 2~6.,15 S 70,82 W 31,77 5.55
.-..::..:
~ ~ '~ o ~o 5 2 ,..1~::. :: ::::~ o.o'o, o o'::. :-:'. :: :.~::::.:.. ~ 72:.e ~ · s-::::::L: :::::e ~.'~::~;~::~:~?~:~::~:~:~:~-~:':~'~?~?:~:"::'~:~::~'
~25 ~52,~ ~oo,oo ~~-~-~;-o~-s~'~o~, ~::b`:~:~:~.:~:.~.:~?~:.:~:~?~:~:~::~:~.:~:7~:~;::~...:.~?~:.:
3345 ~252.13 3200.00 q90.97 S 12~..37 ~ 92.97 19.31
3~69 3352.13 3300.00 562.66 S . ~A4.97 ~ 117.7~ 2~.78
: :: 37q~: :'. 3552:-Z-3-:':::~;-~::-~:~:35"00',:00:~:~: 7..3
:sOHIO-'A KA PETR'OLEUt~ CoMpANY '~:' :':.i:::~::; :i;: i~.;i:.::~ii:;~!i~!:~.:;.{!!!~:i;';~i;!:'~i::~ii i!~iii:i~ili:~.A:~'~:E;:'::O'Fi !/SU"RV~E~;ii~i:i'~Vi'~Hi~:.R;i~..!i. 19e. ~ 1981
M-17 (SEC 1 TllN R12E) COMPUTATION DATE
PRUDHOE BAY NOVEMBER 23, 1981 UOB NUMBER BOSS-16928
L.A__SKA ~EL~Y BUSHING E~EV. = 52,13 FT,
TRUE SUB-SEA TOTAL
_~L[ [~ .UR_ID. ¥..ER T Z C~_L_._ VERTZ CAL RECTANGULAR COORDINATES ~D-TVD VERTZCAL
~165 3852.13 3800.0~ 1027'.9~ S 277,81 W 313,85 ~1.67
~308 3952.13 3900.00 1125.91 S 306.20 W 356.69
...... ~_51 ~0_52_~1~ ~ ~ ~0_0_,_0_0 1.2A.~.,~_l~S ~~__ 399,,.,~ 7 '
I ~5 93 ~15 2:-'.13,~-:::::~:.-::~:'f :~I'0'0 , O 0;:: ':/;~':'~'~::. ;~: ~:'~:13 2'0-., 6 9.::;~":~S'/":':~/~:~::'~:~:~5~ ~ ~2~;~[ ~'~:~: ':~f~
50~ ~52.13 ~00.00 160~75 S ~e.87 ~ 5~7.15 ~2~00
5161 4552.13 qSOO.O0 1706.36 S ~78.80 ~ 609.17 42,02
5883 5~52,1~ 5~00.00 2205~12 S 629~2 W 8~1,~1. ~5~
6028 5152,1~ 5100,00 2~05.~8 S ~60,~8 W 876,63
~1~4 . _5252.13 5200.00 2~07.0'3 S 692.11 ~ 922.3~ ~5.71
· ~ 3 z 9 :. ~:~ ~::'. '. ~.:5 ~s 2 · z 3~.:-. 5 3' o:'o,~:..' o o.:?:~-:;'?~:~::: .'~:':'~0.7~ ~9 ~'~ ~2~5~:~: ~:~:~:;~:-~::..,:~ .....
':.:. ~ ~3 :~.,~:':.,; :..:'5~ 5 2:.:.~: :s:':.::..':'U:;:::;.:~::;~.5~-oo-,.oo: :~:~· :;::?.::::;:;;;;;;~f~:;;::~:::/":~':.~-"O~-.f; 8"~;-::. S;;'~/~:~f';;;; :
'~ -~~ ~:,' .... _.~.~... -.- _ ~...~.~ ..~ .... j _?:.-_: c -... : .... .... .... ,..,....~...,.z..:..,,.:,..-,c ..... ......... ... -.
TRUE SUB-SEA TOTAL
MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
D E P T H ~ . . .:-~iD E.PTH:::..i.i:iii::i~i:~:.l.'.!::'-~::i.:"~! .DE-P TH..:.:.'. ::~N~RT.~Z-~`~:U~i~:~::::~:::~::E~...:`~:~Z~W:E!~:~i:i~::~:Di:[.E~.R!EN::~!E~:~~Q~i:E¢~i~:Q~.
. ,,
G886 5752.13 5700,00 2891.50 S 8~.81 W 11:3~.55 39.~1
T026 5852.13 5800,00 298~.81 S 870.72 W 117~.35 39.80
........... ~ ~'~ .......... ~'*'~ ~'~'- "' ~" --~-~ ,~; ......... ~- ~:" ' "" ' '~"'~ -'- .- ~:': ~. ---:~. -~'-":'~':"'~"":':-':'::" .... ~.~ · ~ ..-'..~. ~.~': ~ .:-': ...:: .-.. · .' ..";"- .-'.-":"~-;-:' · , , ;.~',; ,. ;. ~..~::~.~:~::.~:~:::.::~:~:.::.~.y.~:..~::<~:~:~:~.~:.~:~y:~;.~ :.'.~..: :;.
~ ~ ~ .: ~s 2. ~:~ ..:':::.~ :-.'~ 7oo.:'oo?::.~::~::.:. ~.'~'~?~,~.~ 2--9-~.':'.:'~?s:;~:~.:.~:-;~.-~:a~j::~:~j :..~:~;::~::~::~:~:~.:~:~:~:~F:~"./~:~)
t
~ ~ ~52., ~.'~ ':"::~':~oo.o'o ..:.:-::::?~V.~:'::~-~::~::~:;..s~:.::~:~-~:.~:~:~{:'2~:~.~w~ .:~'~::oo~:~.~:~::~::~.:':.~:~:~:~ ~
86~0 7052,~3 7000.~0 q03~,~8 S Z32q,35 ~ Z~38,00 38,99
8829 7152,13 7100,00 ~116,32 S 137G,5~ ~ 1677,53 39,53
8970 .:-' ..-:. 72 52 * ~-3 ' ':~:'. :.':"~;720 O' *0.0 -~.:~::-: :~:.:~.9~:~5~'.~S:~:~:.:~:~{~:~:~::~}~1~::5~:~g~::.~:~.:~::~5:~:~:~g:~:~:~:~A~:~:"~ ~
-- ' ~..~ ' "~ ~ . .'.... :: -....-...-'.;' -~ :.. ::.,:-:" ::.:--=: :..'~: ..'.:: .:;:':.x.'.v:,<~...,:':-:<.:.:: :.,:: ~:..':,::,:~.:,.~.'.: .:2..'2.2.'..:.:.-;..:'::~'.:-.:': :: .:.: .~.~:.~.~:~ ~..`:~?~:~.?~:~:.:;~`~'~:~.:~:.~:~:.~:~::~:.~ :~. :.:.:.- :.::::.:.:,.~.::::..-'.'.~'.~'..2. :.:::.;:.<.:~/,~";::2<<'..<<'<,;:::':.:.~:,::2::::<:.:'.:'.:<:.::v' .,2': .:'., .... . . ,,
H-17 (SEC 1 TIlN R12E) COHPUTATION DATE
PRUDHOE BAY NOVEHBER 23~ 1981 UOB NUMBER BOSS-16928
ALASKA KELLY BUSHING ELEV. = 52.13
FT.
TRUE SUB'SEA TOTAL
MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES HD-TVD VERTICAL
DE P T H D EP TH- .': '- :'i -~D~P~H::i:~ ..' ."iiii:~':"N~O~TH~ $OU~:~ii:'~':':i.-iii~!ii.~i~EiA:~!~;~i~'~ES:~ii! ~iR~:N i~.R~~i':'Z":~:oiN~i:iil ~'~?. :'~::' .'
,.~.~ ........ z_~ ~. ~"~ ~ so o. o o:' "'-: '~ "~':~'~ '* ~ :~s~'~"?';~i~'~'~:~"~:'~'~:~'~::~:.:~'~/)~:~i~'~;::
9532 7652.1~ .7600.00 ~'521.11 S 1659.21 ~ 1880.27 ~0-19
9671 7752.13 7700-00 ~597.96 S 1716.76 ~ 1918.90 38.63
9809 _7852.13 7800.00 ~673.G~ S 177q.7Z U 1957.05 ·
]0560 8252.[5 8200,00 ~97[.95 S 2008,86 ~ 2[08~50 55,2~
[0~95 8552.[5 8500,00 50~2,25 S 2066,66 ~ 2[~.5,5[ 55~20
10630 8q52.~3 8~00.00 5111.70 S 2~2~.37 W 2~78.26 3~.75
111~7 8852.13 , 8800.00 53~2.87 S 23.55.29 ~ 2295.~2 23.~3
11265 8952.13 8900.00 538~.1~ S 2~03.31 ~ 2313.82 ~8.~0
11380 9052.13 ~000.00 5~20.28 S 2~.33 ~ 2328.53 1~.71
t~-1.7 (SEC 1 TllN RZ2E) COHPUTATION DATE
PRUDHOE BAY NOVEHBER 23~ 1981 dob NUHBER BOSS-16928
.AL.ASEA ........ KELLY BUSHING ELEV, = 52,13 FT,
MEASURED
fDEPTH
11815
11920
ll9qq
TRUE SUB-SEA TOTAL
VERTICAL VERTICAL RECTANGULAR COORB INATES MD-TVD VERTICAL
D EP;TH> .:i.-:.:.: .:..h. ?.i:DEPTH:..:.~N ORTH/SO UTH .... :.~::....-?.
~52,1.3 :- ~:. -9~00, O0 .' .::;.. 5526-56
9552.13' 9500.00 55q7.13 S
957~.89 9522.76 5551.81 S 2606,37 ~ 2369,11 1'13
22-115 - CROSS SECTION - 10 SQUARES TO INCH
Suggested fo~.Tn to 1~3 i~ertcd in eaCh "Active" well folder to d~,eck
for timely complim~ce with our rcx~ulations.
Of)3rator', ~'7cl 1 Name
Reports and Materials to be received by:
Date
Required Date Received Remarks
Cctnpletion Report Yes
.,. ....
7.
.
Core ~scription
.......... ,, , , ,
Registered Su~eY Plat
......... ~., ......
Inclination Su~ey
Drill Stm Test Re. ms
. ~ .... , ~...
..... _ -. , ; ~,~ .
P=~u~&on T~t ~o~res ~g ~ ~, ,
.......
SOHIO ALASKA PETROLEUM COMPANY
SOHIO RESTRICTED
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
" ARCO
MAIL: POUCH 6-61.2
ANCHORAGE, ALASKA 99502
TO: EXXON
Date: 12/7/81 # 1234
PHILLIPS
SFO
REFERENCE:
SOHIO MAGNETIC LIS TAPES. & LISTINGS_
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/AEP/ST:
*A-18 Magnetic LIS Tape & Listing
*E-21 " " " "
11/22/81 ~'/1
11/19/81 ¢/2
OH/CH-DIL/BHC/FDC/CNL (Sch) ~/62331
,
OH-DIL/BHC/FDC/CNL (Sch) ~/62332
*M-17 " " " "
11/6/8'1 ¢/1&2 0H-DIL/BHC/FDC/CNL (Sch)¢/62301
RECEIVED
-. DATE
Alas,ka 0ii we~.l) ~r~ds HQ 4-5
& Gas Cons. 6'omm~s,?,io~
Ar~c.horag~ . ,
ALASKA OIL AND GAS CONSERVATION COMMISSION
Hoyle H. Hamilton
Chairman
Thru: Lonnte C. Smith
Commissioner
Ben LeNorman.
Petroleum Inspector
October 21, 1981
Witness BOPE Tests on
Sohio's M-17
Sec. 1, TllN, R12E, UM
.P~..u.d~. oe, Bay~ Unit
Sat~.rday og...~tober_~9 - I departed my home at 3:30 p.m. for a 4~00
p.m. showup and 5,00 p.m. departure via Wien flight #19 for
Deadhorse arriving at 6:40 p.m. Weather: +21"F, light snow,
light wind.
October 11 - BOPE tests on Sohio's F-18 completed, the
si a separate report.
Monday ~October 1~2- Standing by on DS 912.
October 13 - SSSV's on ARCO's DS 13-3 and 16-11 retested,
the eot a separate report.
Wednesday October 14 - BOPE tests on Sohio's M-17 began at 8:45
a']m'~ and wer'e'-C~pieted at 12,30 p.m. BOPE inspection report is
attached.
I departed Deadhorse at 7:20 p.m. via Wien flight #20 arriving in
Anchorage at 9:00 p.m. and at my home at 9~08 p.m.
In summary, I witnessed successful BOPE tests on Sohio's M-17.
4/81
STATE OF ALAS i. A
ALASKA OI ~ -CAS OONSERVATI(~N CG69~JSSION
B.O.P.E. Inspection Report
Operator C~
Well . /~
Location: Sec / T//A/R/~ M
Representative
Pe rmit #_ ~/-,-
/~Casing Set @ ~ ~ ft.
Drilling C°ntractor~>~/<a~.~z~ Rig ~-~-~---Representative~J/~ ~-~'~m,J_
Location, General O//-
Well Sign ~)/~ _ .
C~neral Housekeeping ~_/~ ....
Reserve pit ~._(~..
Rig ~_/~.
BOPE Stack
Annular Preventer
Blind Rams
Choke Line Valves.__
H.C.R. Valve _
Kill Line Valves --%.
Check Valve
Test Pres sure
ACCUMUIATOR SYSTEM
. Full Charge Pressure__~. ~.~ psig
Pressure After Closure /..~..,~ O psig
Punp incr. clos. pres. 200 psig min~? sec.
Full Charge Pressure Attained: ~ min,~J'sec.
COntrols: ~i~ster _~/~/
R~_e ~/~ Bli~d_..s__~s~i~._ch_covery~-_q-
Kelly and Floor Safety Valves -
Upper Kelly
Lo. er Kelly_
Inside
Choke Manifold
Test Results: Failures- ~D
Repair or Replacement of failed equipment to be made within,.
Inspector/Ccm~.ssion office notified.
Test Pressure__.
Test Pres sure ~-~
Test Pressure
Test Pres sure
.Test Pressure
No. Valves
No. flanges_
~dj ustable Chokes /
Hydrauically operated choke
Test Time' ~4~ hrs ._
days and
Di str ibut ion
-- ,
orig. - AO&GCC
cc - Operator °
o
cc - Supervisor
July 20, 1981
-,
Mr. R. H. Reiley
District Drilling Engineer
SOHIO Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Re~ Prudhoe Bay Unit M-17
SOHIO Alaska Petrolg~,~m~_Company
Permit No. 81-105
Sur. Loc.: 2052'NSL, 606'WEL, Sec 1, TllN, R12E, UPM.
Bottomhole Lo¢.~ 3995'SNL, 3179'WEL, Sec 12, TllN, R12E,
Dear Mr. Reiley~
Enclosed is the approved application for permit to drill the
above referenced well.
Well samples and a mud log are not required. A, directional
survey is required. If available, a tape containing the
digitized lc~ information shall be submitted on all logs for
copying except experimental logs, velocity surveys and dipmeter
surveys°
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations
you may be contacted by the Habi~t COordinator's office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article
(Title i8, Alaska
Federal Water Pollution Control Act, as amended. Prior to
Mr. R, H, Reiley
Prudhoe Bay Unit M-17
-2-
July 20, 1981
commencing operations you may be contacted by a representative
of the Department of Environmental Conservation.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spudded. We would also like to be notified so that a repre-
sentative of the commission may be present to witness testing
of blowout preventer equipment before surface casing shoe is
drilled.
In the event of suspension or abandonment, please give this
of fi .ce adequate advance notification so that we may have a
witness Present.
Very truly yours,
~o¥ ~. ~amiIton
Chairman of
Alaska' Oil &'
Enclosure
cc~ Department of Fish & Game, }~abitat Section w/o eno1.
Department of Environmental Conservation w/o/encl.
SOHIO ALASKA PETROLEUM COMPANY
July 15, 1981
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Alaska Oil & Gas Conservation Con~nission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well M-17 (23-12-11-12)
Enclosed are the following documents, in triplicate, for the
above-named well together with our check for $100.00 to cover
the permit filing fee.
1. Application for Permit to Drill,
2. Proposed Drilling Program Outline,
3. Blowout Prevention Equipment Diagram,
4. Surveyor's plat showing well location,
5. Directional Map.
If you have any questions, please contact either R. H. Reiley at
263-5183 or K. W. Kolthoff at 263-5176~
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
R. H. Reiley
District Drilling Engineer
RECEIVED
JUL 1 6 198I
Alaska Oil & Gas Cons. Commissior~
Anchorag.~
PERMIT TO DRILL
20 AAC 25.005
la. Type of work. DRILL [] lb. Type of well .EXPLORATORY [] SERVICE [] STRATIGRAPHIC []
REDRILL [] DEVELOPMENT OIL ~[] SINGLE ZONE []
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2. Name of operator
Sohio Alaska Petroleum Company;.
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of well at surface 9. Unit or lease name
2052' NSL, 606' WEL, Sec. 01, TllN, R12E, UPM Prudhoe Bay Unit
.I
At top of proposed producing interval 10. Well number
3410' SNL, 2930' WEL, Sec. 12, TllN, R12E, UPM M-17 (23-12-11-12) .
At total depth 11. Field and pool
3995' SNL, 3179' WEL, SeC. 12, TllN, R12E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Prudhoe Oil Pool
Est. KBE = 56'_..AMSLI ADL 28260 ..
12. Bond information (see 20 AAC 25.025)
Type Blanket surety and/or number Sa£eco Tns. 2975387 Amount $200 w000.00
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
NW of Deadhorse 10 miles west of ADL 28282 2930 feet I%TE we~ M_2 .. -2391feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
12195'MD 9690'TVD feet 2469 October 1 , 1981
p's'ig@
t9. If deviated (see 20 AAC 25.050) 120. Anticipated pressures
Surface
KICK OFF POINT 1600 feet. MAXIMUM HOLE ANGLE 43 °l (see 20 AAC 25.035 (c) (2) 4380 psig@ 8800 .ft.]EE[(TVD)-c
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT.`
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
36" 20x30 [nsulat~:d Cond~.ctor 80 Surface 110~1 110 8 cu,yds, concrete
17 1/2 13 3/8 72# L-80 Butt. 2677~ Surface 27071 2680 3720 cu. ft. Permafr°si
12 1/4 9 5/8 479 L-80 Butt. 109~. Surface 10950.. 8785 1650 cu. ft. ClassG
~ I 130 cu. ft. Permafrost
8 1/2 7 29# 5-80 Butt. 17~5 10450 ~, 8420 1219~11''' 9690 340 cu. ft. Class'G
,
22. Describe proposed program: W/18% salt
See attached proposed drilling program outline.
RECEIVED
JUL 1 6 1981 '
Alaska Oil & Gas Cons. Commission
Anchorage
,,
23. I hereby certify that the foregoing is true and correct to the best of my knowledge
~~~ont~use%_~_~ T~TLEDistrict Drilling Enginee~ATE 7- ! _-_ I _
SIGNED
The space below fo R.H.~eiley
0. A..0VA.
Samples required Mud log required I Directional Survey required [ APl number
[]YES ~]O []YES '~NO/ ~-YES []NOI 50- 4~.~- ~-~/--c~;;~
Permit number Approval date
,,, _ ..~/-/o-~"' 07/20/81 I SEE COVER LETTER FOR OTHER REQUIREMENTS
-
APPROVED BY_~__ ,COMMISSIONER DATE July 20, 1981
by order of the Commission
II
Form 10-401 Submit in triplicate
Rev. 7-1-80
PROPOSED DRILLING & COMPLETION PROGRAM
Well M-17 (23-12-11-12)
Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated
conductor to surface using 8 cu.yds, concrete.
Drill 17 1/2" hole to a kick-off point of 1600', directionally drill 17 1/2"
hole to 2707' and cement 13 3/8" 72~ L-80 Buttress casing to surface using
3720 cu. ft. Permafrost II c~ment.
Blowout prevention program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer from 13 3/8" casing point to T.D. Maximum possible
bottom hole pressure is 4390 psi at 8800' TVDss based on original reservoir
pressure. Maximum possible surface pressure is 3330 psi based on a gas
column to surface from 8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12 1/4" hole to 8785' TVD. Run 9 5/8" 47~ L-80 Buttress
casing to 8785'TVD and cement first stage with 1650 cu. ft. Class G cement.
Cement second stage through D.V. packer collar at 2600' with 130 cu. ft.
Permafrost C cement. 9 5/8" casing will be hung at surface; 9 5/8" x 13 3/8"
annulus will be Arctic Packed.
Drill 8 1/2" hole to T.D. at 9690' TVD. C~t 7" liner to 500' inside 9 5/8"
casing shoe with 340 cu. ft. Class G cement with 18% salt.
_Run 4 1/2" 12.6~ L-80 A/B mod. Buttress tubing with 7 gas lift mandrels and
a production packer assembly at18385' TVD. A subsurface safety valve with
dual control lines will be placed at 2000'. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed
perforations to be submitted on Sundry Notice to follow.
JUL 1 6 198J
~t/asJ~a Oil & ~n[~ Cons. Co~rnissio.~
c~omfle
B.O.P.
15
S~TAC K CONFIGURATION
~)~, T,.,.'~ ,~ s~'~',,~
--
5000 PSI WP
DRILLING
,,i
ANNULAR
PREVENTER
PIPE RAMS
BLIND RAMS
KILL LINE
CHECK GATE GATE
DRILLING
SPOOL
PIPE RAMS
4." CHOKE LINE
GATE
HYDR. ASST.
GATE
RECEIVED
03 I M- 6 (Actual)
! I-
R¢i2E ! R.~SE.
I M- 4 (Actual)
48!03' IT. II N.
I
NE Car. o{ Flare Pit I
(Outside..top D~, ~:
~ I~. this survey)
I
i
04
t
t
'--~ ~'-- 282'
~ i M- r
! I L 4140'
I i ! el I "1 '
~ i f i,o47' I .,[.. i
........ T ...................... L .........~ ........................
~ I I
CERTIFICATE OF SURVEYOR
225'--~- ~
CAMP AREA so' 43 / //'/~
--..,
PAD DETAIL
SCALE I" = :500'
PORTION
T. II,12 N., R.12,15 E.
--" SCALE I": !/2 MILE
I hereby certify that I am Properly registered and
licensed to practice land surveying in the State of Alaska and
that this plot represents a location survey' made by me or
under my supervision, and that all dimensions and other
details are correct.
Date
REV. PROPOSED BHL M - 17 6-23-81RJ.R.
REV. BHL M-8 & M-9 FROM PRoPoSED TO ACTUAL. 6- 23- 81~J.R
ADDEDLPROPOSED .BHL M-17. ~.
REV:,PROPOSED BHL M-Ia 2- !:5'- 81 R.D.R
REV. LOC. PROPOSED. M- 9 1~ M- 8 BHL 2 - 10-81 DJ'LO,
ADDED PROPOSED BOTTOM HOLE LOC. M-8, 9 8~ I0 -8-6--80 P.d.R.'
· A~DED ACTUAL BOTTOM HOLE LOC. M-- 6 8~ M- 7 I-8-80 C.d.R,
ADDED PROPOSED BOT¥OM HOLE LOC. M-6 & M-7,8800' SUB SEA 6-6-79 C.d.R.
ADDED ACTUAL 88'20' SUB SEA LOC. M-§ TOP SADLEROCHIT 4-21-76 C.d.R.
PROPOSED 8800' SUB SEA LOCATION M-5 I-19-75 C.F.G..
ACTUAL. 8800' SUB SEA LOCATION M-$ & M-4 10-51-75 C.J,R.
ADDED BOTTOM HOLE LOC. M-4, UPDATED M'-2 8-19-71 A;LJ_.
Located in
E. I/2 PROTRACTED SEC, I,T. II N,~R.12 U¥1AT MERIDIAN; AK
Surveyed for
B.P.ALASKA INC.
d bYI ii
Sbrveye ': '
F M. LIN'DSEY 8~ ASSOC.
LAND 8eHYDROGRAPHIC SURvEYoRs
>.50:;> West Northern Lights B.oulevord Box 4-081.
nchorage A 1osko
2280' TVD @ /NTERS~ION
M-1 3990 ' TVD @ INTERSECTI(/~
2650' TVD
2875' TVD
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No. /~, ~. ~t
ITEM APPROVE DATE
YES NO
REMARKS
(1) Fee
(2) Loc
(3) Admin ~K (9 thru
(4) Casg ~ ?-~7-gt
~12 thru 20)
· {'21 thru 24)
(6) Add:
1. Is the permit fee attached ......................................... ~'
!
2. Is well to be located in a defined pool .............................
3. Is well located proper distance from property line ..................
4. Is well located proper distance from other wells ....................
5. Is sufficient undedicated acreage ~available in this pool ............
6. Is well to be deviated and is well bore plat included ...............
7. Is operator the only affected party .................................
8. Can permit be approved before ten-day wait ..........................
0
10.
11.
12.
13.
14.
15.
16.
17.
'18.
19.
20.
21.
22.
23.
24.
25.
Does operator have a bond in force .................................. ~5
Is a conservation order needed ...................................... ~
Is administrative approval needed ................................... /~
Is Conductor string provided ....................................... .~~
Is enough cement used to circulate on conductor and surface ..... .~~
Will cement tie in surface and intermediate or Production strings
Will cement cover all known productive horizons ................. ..
Will surface casing protect fresh water zones ...........
Will all casing give adequate safety in collapse, tension and burst
Is this well to be kicked off from an existing wellbore ...........
Is old wellbore abandonment procedure included on 10-403 ..........
Is adequate well bore separation proposed ...........................
Is a diverter system required .......................................
Are necessary diagrams of diverter and BOP equipment attached . ..
Does BOPE have sufficient pressure rating- Test to Sooo
Does the choke manifold comply w/AP1 RP-53 (Feb.78) ..................
Additional requirements ............................................. ~
Additional Remarks:
Geology:
HWK ,,
~WA
JAL~
Eng ine~ring:
x
rev: 03/10/81
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO ;iSHORE
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIXi
No special'effort has been made to chronologically
organize this category of information.
,.............-.-----,
bis TAPE
VBRIFIC~TIO~ LISTING
5¥P 009.H05 VERIFICATION LISTING
PAGE
** HEEL HEADER ~*
SERVICE NAME :SERVIC
DATE :81/11/16
ORIGIN :
REEL ~AME :REEL ID
COMMOn, T6 :REEL COMMENTS
*~ TAPE HEADER ~$
SERVICE NA~ :SERVIC
DATE :81/11/16
ORIGIN :1070
TAP~ NA~E :62301
CONTI~UATiON ~ :01
PREVIOUS TAPE :
CO~E~!TS :TAP~ CO~gNTS
** FILE HEADER
FILE NA~E :SERVIC.O01
SERVICE NA~E
VERSlO~ ~
DATE :
MAXI~Uh LENGTH : 1024
FILE TYPE
PREVIOUS FILE
RECORDS
C~ : SOHIO AuA~Ka PEltO
WN : ~-17 (23-12-11-12)
FN : P~UDHOE BAY
RANG: ~2E
SECT:
COU~: NORTH
STAT: ALASKA
CTRY: USA
~NEM C~NTENTS
PRES: DIbO01F
** RECORD
TYPE 047
UNIT TYPE CATE SIZE CODE
00 000 020 065
O0 000 018 065
000 000 OZ2 065
000 000 003 065
00 000 00~ 065
O0 000 001 065
000 000 012 065
000 000 0 06 065
000 000 004 065
J~iT T. XP~ .CAT~ SIZE COOE
000 000
007
O65
5VP 009.H05 VERIFICATION LISTING
RECORD TY~E 0-%7
JOB ~ 10707,62301
BOTYQh LOG iNTERVAL
TOP LOG INTERVA~
CASiDG-~OGG~R
TYP~ ~OLE FLUID
DENSITY
VISCOSITY
FLUID LOSS
RM ~ ~EA$, TEMP.
RMF ~ JgAS. TCMP.
RMC ~ REAM. TEMP.
: 11940 FT.
: 2726 FT.
'- 9.6~5 I2;. ~a 10940 FT.
: 8.50,'-~ IN. ~
= bIGNO-
= 9.40
= 40
= i0.3
= 4:14 C3
=2 0 ~ 76 F
= 2.07 ~ 76 f'
=2.27 ~ 76 F
= .907 ~ 185 F
PAGE
LVP 009.~05 VERIFICATION LISTING PAGE
JOB ~ 10707,62263
COMPANY NA~IE = SOHIO A&ASKA
WELL ~AME = M-17
- PRUDHOE BA~
COUNTY
SECTiOn, : i
TOWNSHIP :
RANGE ~
DIL RUN #1, LOGGED 27-OC~-8!
BOTTOM bOG INTERVAL = 10931
TOP LOG INTERVAL = 2727 FT.
12.25 IN,
CASiNG-LOGGER
BIT SIZE
TYPE hO~E FLUID
DENSITY
ViSCOSiTY
PM
FLUID LOSS
RM ~ ~EA$, TEMP.
RMF @ h£A$, TEMP
R~ ~ 8?iT
LIGNO'
9.9
42 0
4.6 M~
2.87 69 ~
3.92 ~ 69 F
2.95 ~ 69 F
1.~6 ~ 155 F
LVP 009.H05 VERIFICATION LISTING
PAGE 4
TYPE SIZE
OAT U~.~4 SPECIFICATION
MNE~ ~ERVICE SERVICE
ID ORDER #
DEPT
GR
NPhI NUC
GR ~C
CAL~ ~UC
DR~O NUC
NRaT NUC
NC~5 ~UC
FC~L NUC
DT
BbOCKS
UNIY APl APl
bOG TYPE
REPR CODE ENTRY
3 6O
~ ,lin 0
F~ 0 0 O
OHM~ 7 0
0
0
0~ 7 0 0 0
OH~ 7 12 46
0
~v 7 I 0 0
GAPI 7 31 32 0
BU 0 68 2 0
G/C3 0 35 i 0
GAPI o 31 32 0
IN 0 28 3 0
G/C3 0 4~ 0 0
0 ~2 I 0
0 3~ 92 0
0 34 93 0
GAPi 60 ~i 32
APl APl FILE SIZE
CLASS ~OD NO'
4
o oo .
0
0
o° °
0
O0 4 0 1
4 0
°
0 4 0
0 4 0 1
o 4 0
0 4 0
0 4 0
0 4 0
REPR
CODE
68
68
68
~8
DEBT
SP
GR
NCNL
DEBT
SP
NCNb
DEB%
SP
GR
NCNL
DEBT
SP
GR
NCNL
DEBT
1.i93~ o
so°
-999 250
-999~250
i1900,000
~12.b09
139.250
2356.000
i1~00,~00
~66, 38
40,50V
3084.000
11700.000
'82,625
30.547
2680,000
11o00,000
GR
CA ~
FCNL
SFLU
CAbI
FCNL
SFLU
GR
FCNL
SFDU
FCNL
-999. 50
-999,~50
'999,250
'999.250
4.652
84.438
8.430
745.500
~ 484
~3o563
1,28 .000
10.64i
617
111~.000
7.840
PHI
DRHO
DT
Ih~
NPHI
DRHO
DT
NPHI
DT
IL~
DRhO
-999.250
2.375 GR
4 · 129 IhD
27,539 R}iO~
0.090 NhA~~
~2.375 Ga
17.~20 IbD
85 RHOB
0.005 N~AT
8I;375 GR
3.549 II~D
0~057 NRAT
77,750 GR
3.516
-999,250
-999.250
I .875
2.994
2.725
2.854
107,250
3 717
2~377
2.992
2,504
2.22~
28,531
3,219
LVP 009.H05 VERIFICATION LISTING PAGE 5
SP
GR
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
GR
DEPT
SP
GR
NCNL
DEP?
SP
NCNn
OEPT
SP
GR
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
G~
NCNb
-76.312 GA
i8.281 CALl
2730.000 FCNL
11~00.000 SFbU
' 76.500 GB
19.8~4 CALX
2608,000 FCNL
11400.000 SFLU
-73.250 GR
20.656 CALI
3142.000 FCNh
11~00.000 SFLU
86,312 GR
22.625 CALl
2584,000 FCNL
11200.000 SFLU
-94.813 GR
30.297 CaLl
2684.000 FCNL
11100,000 SFLU
-32.063 Gh
7o 435 CA~
2~20~000 FCNL
ooo. ooo
101 8 CALl
i796.000 FCNL
10900.000 SFbO
-19.719 GR
-999.250 CA5i
-999.250 FCNL
10800.000 SF~U
-18.734 GR
-999.250 CALl
-999.250 FCNb
10700 ~00 SF5~
-21:88 GR
-999.250 CALl
-999.250 FCN5
10~00.000 SFbd
.-24,~59 GR
999,250 CALl
-999,250 FCND
29.109 NPHI
8.359 DRHO
1206.000 DT
813 NPHI
1047'.000
8.469
609 NPHI
1395.000 DT
I.453
.750 NPHI
8.633
. DT
933 000
19.547
3~.12 NPHI
9~3.500 DT
22.625
63'031
2.445 ILa
9'1.938 NPHI
10.297 DRHO
517.500 DT
2 189
91.375
9 250
-99:250 DT
2.172
.12 625 NPH~
-999.250 DT
188 NPHI
-999 250 DRHO
3. 170 IbM
999~250 DRHO
-999.250 DT
0.014 NRA~
79.750 GR
i~.979
,434 RHOB
-0,003 NRAT
80.000 'GR
3,291
14.746 ~HOB
0.029 NRAT
72,D63 G
87.750
i5,922
003 NRAT
83.750 GR
10.945 IbP
13,770 R~OB
-0.013 NRAT
68.563 GR
2,195 ILD
I.
o.
i01.188 GR
2,8 ~ ibp
-999,250 RMOB
-9799,250 NkA..'
2.375 GR
:999.250 RHU~
999'250 NRAT
80.750 GR
-99 . 50 RH''
~ 1,000 GR
2.783
'99
9.250 RflO~
-999.250 NRAT
-999.250 Ga
2.371
2,156
20,953
1.718
2.414
3.090
00~
750
7 9
2.494
19.297
18.203
2 ~lb
2:496
30.39I
8,453
2.648
3
64,
2.105
.639
,297
102.625
2,939
-999,250
.344
1,913
-999,250
-999,250
49.625
-999.250
-99 250
2.734
-99 250
-999.250
.~0
LVP 009 H .5
DEPT
SP
DEPT
SP
NCNb
D£PT
SP
NCN~
DEPT
SP
GR
NCNL
DEP~
SP
CNL
DEPT
SP
GR
NCNb
DEPT
SP
NCNb
DEPT
P
NCNL
DEPT
SP
GR
NCNL
DEPT
R
NCNL
Dg~ l~
SP
GR
NCNL
VERIFICATION LISTING
0500 0 0 S~JU
-28:203 GR ,
.-99 .25o CALZ
99~,250 FCNL
0400 000
-30 984
-999 250
-999.250
0~00.000
.28,938
-999,250
'999.250
020O
-28
-999
-999
0100
~27
-999
-999
SFbU
FCNi~
SFbU
CALf
FCNL
000 SFLU
~ ~
0 ~ ~R
250 CALI
250 FC~b
1563 GR
,25 ~A ~
,250 ~CNL
10000,000 SFLU
-31,469 GR
· ,999'250 CALi
'999,250 FC..~
9~00,000 ~bU
'23,73~
.-999,250 CAL~
999.250 FCNL
9800. 000 SFLU
,-,20.51~ GR
'999~250 CALl
'999. 250 FCNL
9!00.000 SFLU
13,~91 GR
99 , 250 FCNL
9600.000 SFLU
.~13,08~ GR
99'250 CALf
'999.250 FCND
· ' ~61 GR
PAGE 6
, D
959 I~M . 2,~B7 fL 2,814_
8~,000 NPHi 999
· 250 RHOB 999.250
-999 250 DRHO 9~9.250 ~RA~ 999.250
'999'.250 DT '999.250 GR '999,250
2.264 IbM 2'633 ILO 2.452
.063 LPHi 999.
'999i250 DRMO '9:99' 50
9 '
'9 9.250 DT '999,250 GR -~ 250
_
I .720 IbM
-99 .250 DRMO
-999.250 DT
I0 t. 438 NP~Z
'99 250 DT
2.771
79,188 NPHI
-999,250 DR~O
-999'250 DT
1.626 ILO 1.540
9 9,250 RHOB 999.25
-99~"250 NRAT -999,2~0
-999"250 GR -999.250
. .
- 50 RHOB 999.250
3.047
81.188
999.250
ILM 3.,2,64 Zl~P 3.201
NPHE -999,2§0 RHOB -999.250
DRMO .-999.250 NRAT .-999,250
DT ' 999. 250 GR' 999,250
2.744 ILM
83 188 NPHI
-999:250 DRHO
-999.250 D~
i.477 IbM
108.312 NPHI
-999.250 D~HO
-999,250 D~i~
3.ii3 Ibp - . 3,027
'999.250 RHOB ,999.250
-999.250 NRAT 999.250
' 9
9 9,250 GR -999,250
·
.
1.479 IbM
.112 875 ,.PHi
999:250 DRHO
'999.250 DT
999'250
i.452 ILD . 1.410
-999 , 250 R~O~ 999 , ~50
-999,250 NRAT -999,250
9 9,250 GR -999,250
·
LVP 009.H05 YERiFICATION
DEPT 9400.000 SFLU
SP -14.977 GR
GR -999.250 CALf
NCN~ -999.250 C~
D~P'i~ ~00.000 Si~C;
SP I5.977 GR
GR 999.250 CALl
NC.~L -999.250 FCNL
DEPT 9200.000 SFLO
SP .-1.7.719 GR
GR 999,250 CA5i
NCML -999,250 FCNL
DEPT 9100.000 SFLO
SP ~16~484 GR
GR -999,250 CALl
NCNb -999.250 FCN~
DEP~ 9000.000 SFSO
~P .'20,031 GR
GR 999~250 CALl
NCNL -999.250 ~C~' ~'L
D£P~ 8900.000
SP -20~141
GR -999,250 CALl
NCNb -999~2S0 FCNL
D£PT ~7~0,000 SFLU
SP .~2i.719 GR
G~ -999,250 ~ALi
NCNb -999. 250 ~'CNL
DEP1' 8600.000 SFBD
P -22.43~ G~
~R -999*250 CALl
NCNb -999.250 FCNL
DEPT 8500.000 SFbU
SP -24.18~ GR
GR -999,25 C~L~
NCNb -999.25~ FCNb
DEPT 8400.000 SFbO
SE -15.~7~ GR
GR -999'25 CALl.
blST1NG
1.541
104.375
-999.250
-999.250
.250
2.357
111 000
-999:250
-999.250
-99~ 250
2.383
109.938
-999.250
-999.250
i0~ o443
,375
-999.250
-999.250
2.137
105.938
-999.250
-999.250
2,295
103.000
-999.250
-999'250
2.586
Ii0" 0
-999,250
-999.250
3.566
178,i25
-999 0
§0
2.074
.9277.250
99.250
DT
PHI
DRHO
DT
RHO
DT
NPHI
DRMO
DT
PHI
DT
IBM
RHO
T
NPHI
DRHO
DT
I LM
DRHO
DT
IbM
DRHO
~PHI
OT
NP~;
D~H~
1.629 ILD
.-999 250
'999:2S0
-999.250 GR
*250
-999.250
999~250 GR
2.348
-999.250
-999.250 NRAT
- ' 9
9 9.250
. 2.924
999.250 RNOB
-999,250 P~RA%
-999.250 GR
2.473 ILD
-999,250 GR
2.5i2 IbD
-999'250 RMOB
50 NRAT
2.176
99.250 NRAT
~5
-999.2 0
2.578 ILD
99~,250 NR
.250 G~
2.740 IbP
.99~,25U
.250 NRAT
-999.250 GR
3, ~44
-999,250 RH00
-999.250 NRAT
-999,250 GR
I.~48
999. 250 NRAT
PAGE
1.5
-99 2
-999 2
3
-99 2
2.3
,999.2
-999.2
2.9
-999.2
-999,~
-999.
2 4
-99 i 2
-9999 2
-999.2
5
-999.2
'999,2
2.I
'999,2
'999'2
'999.2
2.5
'999.2
'99 2
.
-99~.
-99 .
-999.
-999.
-999
-999:
999:
59
5O
5O
5O
97
5O
5O
5O
75
50
50
50
02
50
50
50
51
50
5O
5O
O2
5O
5O
5O
31
5O
5O
50
92
50
50
50
711
250
250
250
439
250
250
250
844
250
25O
NCNb
DEPT
SP
NCNb
DEPT
SP
GR
NCNb
DEPT
SP
C~ IJ
DE?T
SP
GR
NCNb
DEPT
GR
NCNb
P
NCNb
NC~
DEP~
NCNb
DEPT
SP
GR
NCNL
DEPT
GR
NCNb
DEPI
SP
VERIFICATION LISTING
-999.250 FCNL
8300,000 SFb~
-27, i 25 GR
-999,250 CAgI
-999.250 FCND
$200.000 SFLU
.-14.844 GR
999.250 CALf
-999,250 FCNb
Ioo.ooo
~.,17,969 GR
-999.250 CAb1
'999. 250 FCNL
8000.000 SFbU
.-14.328 GR
999,250 CALf
'999,250 FCNL
v. oo.ooo
' 15. 336 G
-999,250 CAL/~
-999~250 FCNL
7800,000 SFbU
. -9.992 GR
~99,250 CALl
-999,250 FCNb
7~00,000 SFb¢
-999.250 CAL~
'999~250 FCNL
7600.000 SFb[)
.-11,57~
~99,25 CALl
'999.250 FCN4
7500000 FLU
:999.25o
999.250 FCNL
7400.000 SFLU
.-19,750
-999,250 FCNL
7 ,000
~ 177~ GR
9 ~.250 DT
~ 3.504 IbM
~94;i25 NPHI
-999.250 DRMO
'999.250 D~
2.89I
.137,~25 NPH~
999, 50
-999,250 DT
PAGE 8
-999.250 GR -999.250
2,789 I~D . 2.748
-999,250 RMOB '999.250
.999,250 NRAT 999,~5
'999~2~0 GR- -999.250
2.086 ILO 1.979
~25 NPMI 999.250 RHOB 999 250
.999,250 DRHO 9_9. ,2 250
999. 250 DT -999.2 250
3.506 IbM 2.312 IhD 2.279
. :9 9.2s0 :999. 50
-999.250 DT 999.250 GR 999.250
·
5.367 IbM . 3.514 ILO 3.~47
.1801i25 NPMI 999,250 RHOB ~999.250
999.250 D~HO -999.250 NRAT .999'250
-9991250 DT '999'250 GR .999;250
-999~ 50 DRH~ -999, 50 NRAT -999.250
250 ~ 999.Z5
-999.250 DT -999, ~R - ~ 0
-
i.874 Ib.~ 2.076 ILD . 2.090
131.$75 MPH~ -999'250 RHOB .999.250
-999'250 DRHO -999.250 NRAT ~999,250
-999,250 DT · -999;250 GR 999.250
2,275 IbM 2.830 IbD . 2,910
9~,063 NPHi 999.250 RHOB .999.250
-999,250 DRHO 29"99'.250 N'RAT .999.250
0 GA 999,2 0
'999.250 DT -99.259 -' ' 5
9~.28~ IbM ~2.~8 ~b0 2. 82
'063 NPHI :999'250 RHOB -999.250
-999.250 DRHO .999'250 NRAT :999.250
'999~250 DT 999~250 GR 999.250
4'.145 IbM
.i12.938 NPHI
999. 250 DRH(]
'999.250 DT
330
4.215 ~LD 4.326
99 .250
9 9.250 OR .9 9.290
3,~08 ILD . 3,588
'999~250 RHOB
999,250
LVP 009.H05 VERIFICATION
NCNb
~99 ,250
99~.250 FCNL
DEPT
SP
NCNb
7200 . 000 Sf~Lt,{
-i4,766 GR
-999~250 CAb%
-999'250 FCNL
DEPT
SP
GR
NCNb
7100.000 Sf'b[~
'16~406 GR
999~250 FCNL
DEPT
SP
GR
7000.000 SFLU
.-17.2~ GR
999.250 CALl
-999,250 FCNL
DEPT
SP
GR
NCNb
6~900,000 Sf'bu
-.18,078 GR
-999,250 CALl
'999.250 FCNb
DEPT
SP
NCNb
b~O0,O00 SFLU
,953 GR
DEPT
SP
NCNb
6 oo
'~20
999
,000 SFbU
.547 GR
250 rCNb
DEPT
6600.000 SFbU
999:250 CALl
-999.250 FCNL
NCNb
6.500.000 SFbU
16, i88 GR
:999,250 CALI
999.250 FCNL
DEPT
SP
GR
NCNb
6400.000 SFDU
-16 813 GR
-999:250 CALf
-999.250 FCNL
DEPT
SP
NCNL
63..00,000 SFLU
'~2I.;672 GR
-999,250 CAbI
'999' 250 FCNL.
DEPT
6200.000
LISTING
~999,
,999.
~,999,
999;
2-979
~0~,
-999.
-999.250 DT
5.340 IbM
105.563 NPM
9,~ 250 DRHO
-999.250 ' ~
3.896 Ib~
93.250 NPHI
'999. 250 DRHO
'999.250 DT
PAGE 9
9~250
9~250
25O
25O
-999,250 GR 999.250
50
2'97:9 IDD 3,088
25O
25O
999,250 ~R 999 250
.742
'250
:999,250
999,250
.188 NPHI 250
-999.250 DRHO 999,250 ~RAT 999 250
'999*250 DT -999.250 OR 999 250
4 023 IbM
.107 063 NFHI
999 250 DRHO
-999.250 DI
8~.082 IbM
'938 NPHX
4.340 IbM
83,375
-999.250 DRHO
-999.250
4, 56 ~
25O
250
.250
'250
-~ -' 250
9 250
999.250 GR 9 250
'~,7025
6g, 63 ~PHi
999 250 D~MO -
999:250 DT -
21.219 IbM
P
NCNL
DEPT
SP
GR
NCNL
DEPT
SP
GR
NCNb
DEPT
SP
G~
NCNL
DEPT
NCN~
DEPT
NCNL
DEPT
SP
DEPT
SP
GR
NCNb
DEPT
SP
NCNb
DEPT
NC~b
009.H05 YERIFICATION
-999 ~ CALl
-999.250 FCNL
6100.000 SFDO
'52.594 GR
'999,250 CALl
-999.250 FCN5
6000.000 SFbU
;250 CALf
-999. 250 FCNb
5.900,000 ~LU
'73,563
'-999.250 CAL. I
'999.250 FCNL
5800.000 SF50
-105.875 GR
'999.250 CALf
'999.250 FCNL
5700.000 SFLU
'131.875 GR
-999,~50 CALI
-999~250 FCNL
5600.000 SFLU
.-67,81 G
'999,25~ R
CALI
-999.250 FCNL
5500,000
-96,688
-999 ~50 CALI
-999:. 50 FCNL
5400.000 SFLU -77.938 Gl{
-999,250 CA&I
-999.250 F~.NL
5300.000 SF~U
-106.438 GR
-99~.20 CALl
-999.2~0 FCNL
5200.000 SFLU -61.250 GR
-999.'250 CALI
-999.250 FCNL
PAGE
:
9
39 2 IL~
70.063 NPHI -999'a36
4.6~0
.250 RHOB -999.250
-999. 250 DT -999. 250 GR 999:2250
999:250 DRHO 999.250 NRA -999. 50
-999.~520 DT - 999.250~' ' GR -999.250
7.105 I~ .~06
52.563 NPRI 990 4[027
- .250 RHO~ -999 250
:999.250 DR~O -999.250 ~RA~ -999 250
' 999,250 DT -999~250 G~ -999. 250
4.367 Ih~ 2.355 ILD I .937
5 ~8 NPHI -999,250 R~OB :999,250
.2 0 DR~O -9~9. 250 NRA~ 999.250
- ' ~ 0 ,
999.28 DT -999 250 GR -999.250
5.836 IbM 2.!93 ILL . ~.782
35.750 NPM): -999~250 RHOB -999.250
-999 50
· 250 NR
.
4.883 IbM 4.5i6 ILL 4.883
9.9,250 RHOB -999.250
. 56,281 gPHI -"9
999.250 NRAT -999,250
'999.~250 DRHO -' ~ ~
-999.Z 05 DT GR -999,250
. ?07 : 7
.250 DRHO
,250 ~RAT -999250
4.543 IL~ 4.516 ILL 4.168
68,188 NPHI -999.250 RHO~ 2999.250
-999.250 DRHO -999.2.50 NRA~ 999.~50
-999.250 DT -999.250 GR -999'250
3.041 Ib~ 4.230 ILD 4.242
. 7~,438 NPhI -999,250 RHOB -999.250
"99~, 250 DRHO -999' 250 NRAT -999. 250
-999'250 ~T -999,250 GR -999.250
lO
LVP 009.H05 VERIFICATION LISTING PAGE
DEPT 5i09.000 SFLO
SP -76.813 GR
GR -999,25
NCNB -999.25~ CALl
FCN/,
DEPT 5000.000 SFLD
SP '75,813 GR
GR -999,250 CALl
NCNB -999,250 FCN5
DEPI 4900,000 SFLO
SP -60.594 GR
GR -999.250 CAB!
NCNB -999.250 FCNL
DEPT 4800
SP -77
GR -999
NCNL -999
~000 $~b,
938
250
25O
DEPT 4:00
SP '79
GR -999
NCNb -999
00 SFEU
63 GR
.ZLO CAb
.250 FCNL.:
DEPT 4600.000 SFL0
$P -91,68~ GR
GR -999~250 CALI
NCNB -999.250 FCN~
DEPT 4500,000
SP ~84.
GR .-999 25
SFLU
GR
CNb
DEPT 4400.000
SP '100'063
GR '999,250
NCNb '999.250
$FLU
FCNL
DEP~ 4300.000 SFLU
SP -i17.875 GR
GR -999 .250 CALI
NCNB -999.250 FCNL
DEPT 4~0,000 SFLU
~25 CALl
~R -99 0
NCNL -999.250 FCNL
DEPT 4100,00~ 8FLb
SP -126'18 GR
GR -999,250 CALl
NCNB -999.250 FCNb
000 NP~I ,999,250 RH
1999.250 DRHG -999.~50 NRAT
999.250 DT '999-250 GR
4.0~3 Ib~
70.813 NPHI
-999.250 DRMO
- 9
9~9.250 DT
3. 848
999.250 RHOB
999 . 250 NRA
- 99 9,250 GR
6~.814 IbM
.813 NPHI
250250 DTDRMO -999: -999250250 GR~RAT
3.424
-999,250
-999.250
-999.250
3.803
-999.250
-999.250
-999.250
250
-999.250
999,250
,2~
NRAT
50~ GR
5.629
:999.&50
999.250 NRAT
-999,250 GR
8.48~ .000
-999.250 DT
D
3.787 Ib
-999~250 RHOB
' ' ~AT
99~.250 ~R
-999.250 GR
75 NPHI
999.250 DRHO
999.250 DT
11.844 ILD
-'9" 50 RHO~
· 9:9,2
'999. 250 NRA':C
-999.250 GR
14.023
. 5~.906 NPMI
999.250
-999.250 DT
. 15.055 Ih[.)
999'250 RHOB
-999.250 NRAT
'999.250 GR
22.344 IbM
50.875 NPMI
999.250 DT
IbM 5.46i
NPMI -999,250 RIiU~
DRMO '-999.250 N~hi
DT -999.250 GR
5.027
999.Z5
.106,438 IbP
999.250 RMOB
9 9,250 N~AT
-999 ' 250 GR
234,625
28.6~! NPHI
-999.250
-999.250 DT
. 4.359
.-999.250
999,~50
-999,250
5,320
-99 250
-999.250
. 3 73b
-999.250
-999. 250
~2.125
'so
999.25
. 14.836
999.250
-999,250
-999~250
6.152
999,250
-999.250
-999.250
-999.250
-999,250
LYP 009.H05 YER£FiCATION 5ZSTING
DEPT 4000.000 SFLO
99 .250 CALl
NCNb -999.250 FCNL
DEPT 3900.000 Sf'LU
SD -120.750 GR
GR -999.250 CAnI
DEPT 3800.000 SFLU
SP '77.125 GR
GR -999,250 CALI
NCNb -999.250 FCNL
DEP~~ 3700.000 SFLO
SP 74.625 GR
GR [99 250 CAi~I
GR 99 .250 CALl
NCNb -999,250 FCNL
DEPT 3500,000 SFLU
SP -76,438 GR
GR .-~99.250 CALl
NCNb 999.250 FCNL
DEPT 3~00.000 SFLU
SP .,i'74'813 GR
GR -~99,250 CALf
NCNb -999.250 FCNL
DEPT 3200.000
P -_i27.312 GR
~R -*'999.2S0 CA!~I
NCNb -999.250 FCNL
DEPT 3100.000 SFLO
SP -108.688 GR
~R -99~.250 CA~
~CNL ,,999 ~ 250 FCNL
DEPT
R
3000.000 SFDU
999.2§0 CALI
71.625 IbM
27.750 ~,PHI
-999'250 DRHO
-999.250 DT
38,844
-999.2~0 HOB
-999,250 NRAT
2' 828 IbM 29,984
'250 RHOB
936 NPHi
250 DRHO 9 9,2
-999, ' ~ ' 9
'999'250 DY '999.2
6.461
7S.500 NPhi
'999.250 DRMO
'999.250 DT
7~,258 IL~
'875 NPHI
:999.250 DRHU
'999.250 DT
8.555
5 ~
Z.375
'999.250
'999.250
7.105
'999.250 GR
999.250 RHOB
ILN 8.109 I~D
DT '999.250 GR
DRH~ '999,~50 N~AY
DT -999. 50 GR
Ih~ 7.816
DT -999.250 GR
250 NPHI
999.250
8.531
~, 25,,
-9939.250
-999.250
6.227 ~h~ 6.086 IbP
84,063 NPMI -999.250 RHOB
-999,250 DRHO -999" 250 NRAT
'999;250 DT -999.250 GR
7.254 IbM
45.688 NPHI
-999.250 DRMO
-999.250 PT
.180 I5~
6 . 906 NPHI
-999.~50 DRHO
-999.250 DT
9.750
55.53~
-999.250 DRMO
5'383 ILD
-~9~.25o G~
5.934
-999~250 RH~B
:999,250 NRAT
999,250 GR
7.~25
46.188
-999 250
-999:250
-999.250
32,34%
-999.2~0
50
999:2250
8.102
-999.250
-999.250
-999.250
7.496
'999.250
~99 250
7.765
2999 50
-999,250
. 8,531
999.250
-999,250
-999,250
7.172
-999.250
-999.250
-999.250
6.~45
999,250
999.250
999~250
4.~91
99g,250
999.250
-999.250
. 5.719
999.250
-999,250
-999.250
6 . 738
-99 250
LVP 009.H05 YERIFICATIO~ LISTING
NCNL -999.2S0 FCNb
9.250 DT
340
-999 250
-999:250
DRHO
DT
DE ~[ 2800.000 8FhO
SP -90,312 GR
GR -999.250 CAbI
NCNL -999.250
3 · '338
. ~ 63
-999.250
D~O
DT
DEP~ 2704.500 SFDU
SP ~64..750 GR
GR '999,250 CALI
NCNb -999.250 FCNL
i,847
41.781
:999.250
.'999.250
I
FILE N~SE :$ER¥IC.O0i
SERVIC~ Na~
DATE :
~AXIhU~ LENGTH : 1024
FILl TYPE
NEXT FILE NAME
-999.250 GR
-999. 50
..999.250
999.250
3.566
-999,250 R~O~,
'999.250 NRAT
-999.250
2000..000 ILD
-999.250 RMOB
-999,250 ~RAT
-999.250 GR
P~GE
-999.250
4.949
-999.250
-999.250
-999.250
4.063
-999, 50
.999.~50
-999.250
2000.000
:999,250
999,250
-999.250
13
SERVICE NAME :SERVIC
DATE :~/11/16
ORIGI~ :107o
TAPE NA~E :62301
CONTINUATION ~ :01
NEX~ TAPE NA~E :
COM~EN~S :TAPE COMMENTS
** REEL TRAILER *~
SERVICE NaME :SERVIC
DATE ~I/11/16
ORIGI~ :
REEL ~A~E ;REEL ID
CONTI~ATI~ # :01
NEXT kEEL NAME :
CO~u~ 'REEL COMMENTS