Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 13-23 Well Completion Report
Dear Mr. Chatterton'
Enclosed are the well comPletion report and single-shot survey
for DS 13-23. If you have any questions, please call JoAnn
Gruber at 263-4944.
Sincerely,
P. A. VanDusen
District Drilling Engineer
PAV/JG2L51'sm
Enclosures
ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany
APR 0 ? IC B3
0it & GaS Cons. Commission
' ' ' (~' '~,' STATE OF ALASKA 0 I~ I G I N A [
ALASKA UI£ AND GAS CONSERVATION CO,..MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG "
1. Status of Well Cla§sification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED ~[~ SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 82-08
3. Address 8. APl Number
P. 0. Box 360, Anchorage, AK 99510 50- 029-02704
4. Location of well at surface 9. Unit or Lease Name
2586' FNL, 1659' FEL, Sec. 14, T10N, R14E, UN .~ Prudhoe Bay Unit
At Top Producing Interval ILL')'L-/~( tL')N'~ 10. Well Number
N/A IVE21FIED 13-23
At Total Depth '~Sur,~. E 11. Field and Pool
2184' FNL, 2100' FEL, Sec. 14, T10N, R14E, UM _B" .......... E _ Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool
87' RKB ADL 28312
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
01/27/82 N/A 02/06/82I N/A feet MSL N/A
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+-I-VD) 19. Direc, tjona. ISurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost
2851'MD,2700'TVD Surface YES D(-I~on~le- NoEl N/A feetMD 1750' (Approx)
22. Type Electric or Other Logs Run
.
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 94.0# U-40 Surf 118' 30" 300 sx Permafrost C
24. Perforations open to Production (MD+TvD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
N/A N/A
,,,
.
26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
1007' 4500 Sx AS I I I
·
(Plug to surface) .
,
·
,
·
27. N/A PRODUCTION TEST
Date First Production ' Mei[hod Of Operation (Flowing, gas lift, etc.) .
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ]GAS-OILRATIO
TEST pER I.O'D-l~ , '
Flow Tubing Casing Pressure CALCULATED ~1~ OIL-BBL GAS-MCF WATER'~BBL, OIL'GRAVITY-API (corr)
Press. 24-HOUR RATE "K. "'
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
,
... ,,
None
.... ", RECEIVED
APR 0 Y i983
Alaska 0il & Gas Cons. Commissio~
Anch0rag~
·
,.,
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
GRU2/WC30
29.
NAME
N/A
GEOLOGIC MARKERS
MEAS. DEPTH
UE VERT. DEPTH
30.
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
N/A
31. LIST OF ATTACHMENTS
Drilling History, Single-shot Survey (2 copies)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Title
Area Drilling Engr.
Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not'otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (G L) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
· "~ Water in~
cores ~:ak, en, indicai:e "none".
Form 0-407
,
- -x-.~_~..-.--.:~-?,-~.?~: ~.s., ,-~,..: ~ ~,-"-,,,-~,,~,':,~.',,-,-,:'~.,'~A;~:~.-:-~..~,~'4.-~~~'-'''''~''?-'''?~'~7~''~ *:'~"'"'~ ..... ...... ..........
13-23
Drilling History
NU 20" Hydril & diverter. Spudded well @ 0740 hrs, 01/27/82. Drld 17-1/2"
,,
hole to 2851'. Circ. and conditioned hole for 13-3/8" csg. Attempted to
wash and ream bridge @ 2658'. Pipe backlashed; backed drill pipe out 384'
below rotary table. Attempted to screw back in - unsuccessful. TOH. TIH
w/fishing assembly. Ran DIL/CCL/SP/GR; top of fish @ 594' (Logger's depth).
RIH w/fishing assembly and fished. (Fish = 17-1/2" bit, X-O, 17-1/2" N.B.
Stab, 17-1/2" Stab, L.C., 1-8" monel, 17-1/2" Stab, orienting Sub, 3-8"
monels, 11-8" steel DCs, 17-1/2" Stab, 8" Jarco jars, X-O, 51 jts HWDP and 7
jts DP.) Unable to recover. POH. TIH w/open-ended 2-7/8" tbg to 1007'.
Pumped 4500 sx AS III cmt. TOH. ND 20" Hydril & diverter. Secured well
and released rig @ 1600 hrs, 02/06/82.
JG:sm
04/04/83
GRU2/DH22
ECEIVE
APR 0 ? 1§83
Al~sk~ Oit & Gas Cons~Gommi$$[o~'
Anchorage
Anchorage, Alaska 99510
Telephone '~' ~ ',277 5637
December 3, 1982
RE: ARCO Directional Surveys
~D.S., 1-21 10-22-82
~D~.'S. 6-24 10-22-82
f'D.S. 7-15 10-28-82
.~D. S. 12-4A 11-15-82
-~D.S. 12-7A 11-15-82
~D.S. 12-8B 11-15-82
/D.S. 12-14 '11-15-82
-~D.S. 13-14 11-15-82
fD.S. 13-15 11-22-82
-J~.S. 13-16 11-15-82
~D.S. 13-17 11-15-82
~D.S. 13-18 11-15-82
.$,,~1',3'23 11-15-82
.S. 13'23A 11-22-82
/D.S. 13-24 11-15-82
~q~.S. 13-25 11-15-82
~d).S. 13-26 11-15-82
Single Shot
Single Shot
Single Shot
Single Shot
Single Shot
Single Shot
Single-Shot
Single Shot
Single Shot
Single Shot
Single Shot
Si ngl e Shot
Single Shot
Single Shot
Single Shot
Single Shot
Single Shot
' J.S. 13~30 11-15-82 Single Shot
/D,S. ~Y3-32 11-15-82 Single Shot
X//F~'~' '13-34'~ 11-15-82 Single Shot
...~x/ PleaSe sign and return the', attached copy as receipt of data.
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/W
E/~J
E/W
E/W
Bec'ky Benedi ct
AFA --403
Trans. #638
DISTRIBUTION
NORTH GEOLOGY
R & D
DRILLING
PHILLIPS
SOHIO
MARATHON
CHEVRON
GETTY ~,~sk~ 0~1 & ~k~cbo~e
D&M
STATE OF ALASKA
DALLAS
ARCO Ala~ka. inc. is a Subsi4iafy of AtlantlcRichfteldCompan¥
Eastman
Whipstock
A PETROLANE COMPANY
REPORT
of
SUB-SURFACE
DIRECTIONAL
SURVEY
ARCO ALASKA, INC.
COMPANY
DS 13r Well Number: 23
WELL NAME
Prudhoe Bay, North Slope, Alaska
LOCATION
JOB NUMBER
TYPE OF SURVEY
Directional Single Shot
~! E C E ~ V E DDATE
DEC 0 ? ]982
Alaska Oil & Gas Cons. Commis;ic,,1
Anchora[;o
SURVEY BY
American Directional Drilling
(G. Thibodeaux)
OFFICE
ARF:O ALASKA, I
DS 13., WELL NA: Z.z: [.:,.:,
PRLIDHOE BAY, NORTH .SLL-~F'E, ALASKA
D'.'~:°.::., 0-2781 MD~ DRILLER: G THIBODEAUX
( AMER I CAN D I RECT I ONAL [iR ILL I NG )
VERTICAL .::,E _.T I ON CALCULATED ~IN PLANE OF F'ROPO.SAL: -: .... '
DIRECTION: N 50 PEG. !;3 MIN.
REE:ORD OF SURVEY
RADIUS OF CURVATURE METHC,[I
ARCri ALASKA, INC.
DS 1 :=.: ~ WEEI_L NFl: 2:]: D?'-'::=:
F:'RLIDHC~E BAY, NOIR'TH SLOF'E., AL. ASEA
COHPUI"A]"!OJq PA(3E NO.
¢
(AMERICAN DII~ECTICINAL DRILLIlXlG) TIME DATE
14..' 5/=.: 28 15-NOV-8'2
'I'RI_IE_
.......... :._IB.:,EA R E C T A N O U L A R C L Fi S LI R E DOGLEC';
MFA'.:;I IREI'~ i)R IFT DR IFT F:F, IF;".:;E VFRT I CALVERT I C:AL '---t ' '-' _
I)EF"TH ANGLE DIRECTION LENGTH I]EPTI~I SECTION- TVD C O 0 R D I N A T E ..E; DI.'S;TANCE DIRECTION :':;EVER I ]'Y
F:'EEI' D M D M FEET FEET FEET FEEl' FEET FEET D I'1 I]G/1OOF]'
0. 0 0 0 0 0. 0.00 0. O0 -87.00 O. 00 0.00 O. O0 0 0 0.. 00
9F~C) 0 (-! C) 0 9~/I c~F;('l ClCI Fl 00 """ 0 00 (') 00 0.00 0~ ("iCI
.................... o6.:,. 00 , _. 0 0 . .
1007. i 15 N 60 0 W 5'7. 1007.00 0.61 ?~20.00 0.:31 N 0.54 W 0.62 N E.O 0 W 2. 1'?
1068. 2 15 N 5i 0 W 61. 1067.?~7 2.47 '~80.S/7 1.36 N 2.07 W 2.48 N 56 38 H 1.70
1168. 4 0 N ~':' A H 100 11A7 °1 7 9? 1 "-'" 81 4.7A N 34 W 7 '~':, ~':'
............._, 0,:,0. _ 6. . ...~. N ..... 6 N 1 . ~, ._,:'
~78 5 A N 5~ A W :::0 1197,7~ 10 27 1110 72 6 17 N 8 "':'
.............. ~. W 10 oo N ~:;':' 5 .
.~ ..... W :3:37
:30 1227 5o 1 ':' 13 1140. :., ,=, .-
,.,o 7 c,O N 10.5g 5'-'
. ._ ~ W lc:. 1~ N ._.:, 37 W 3 47
47 127.1,30 1':" 24 1187 -'c .... .:, W 1,_ ..... N 44 W .:,. 19
. ,: .... :,) 11 05 N 14 ~;~' o ~,~ 52
31 l:::(')S 12 ':'1 51 1218 1° 1':' 74 N 16 5~
.... , W 21 M1 N F;o 18 W 5. 16
0 1334 Sy7 24 F:O 1247 S/-/ 16 oo N 17.iT,'? W 24.33 N 4'7 41 W 1.'74
1228,, - ./:.0 N 57 0 W
1 ..'7._ 6 '3C) hi 4.4. C)
1:30,/=,. 6 0 N :30 0 W
1:336,, 5 30 hi 27 0 W
14.!5.']:. 8 0 hi 5 0 E
]575. 10:30 N 25 0 W
1666. 12 0 N 43 0 W
1788,. 16 3C) hi 54. C) W
1 '.:.'>1:':i:. 17 30 N 54 0 W
117. 1451.15
122 1571 ._~
91. 1660~80
1'22. 1779.02
125. 1898.55
36.14 N :34 43 W
54.35 N 26 8 W
71.~1 N 28 4. W
100.54 N 34 2 W
135.47 N 3~ 17 W
3,78
4.38
4.17
4., '2:':'}
0,80
202./=,. 18:30 N 51 C) W
..- 1'~':), .. ~ ~._..':"=, :]:r~. N 50 o. W
23:3:3, 2:3:30 N 50 0 W
'"-4:3 ?. :34. 4'-.:, hi .:,'-'L) ('). W
~654. 3'? (:) N 5(:) 0 W
11:3. 2006.02
15:3. 2148, 81
154, 2287, 18
156, 2419, 'F~5
165, 255!. 71
167.87 1919.02
222,69 2061.81
290,17 2200.18
371 '~ oo-~o ,-,=
470.92 2464..~1
1,-:.. (_)._ N 113.'='= .
._,._, W 169.65 N 4- 2: 1 W 1 21
160. '-}'-':'. ~. N 1'=;F4._ -_. :34 W 224 . (')1. N 44 ._,'= W 3.2::::
204. :3C) N '---.'07.54 W 291.22 N 4.5 27 W 2:, 2.5
25/=..85 N 27(). 17 W 372.78 N 4.6 27 W 4.C)1
32. 0.4 :=: N :=: 4. 6. ()_ C) W 471 .62 hi 4. 7 12 W .-'='. ':;._,,:,'""
s-'->','::l 4, A F) N 4"..-~ (') W 127 ";'/-,4'=.~ 91 '-"'=1 /.:,';.-~ '-';' .~; /-, ";' 91 '-'-'-' '---~4 40'7 4:3 W 552:34. ..
............................. :,7~.. N . . N 4'7:32 W (") 'F-':3
hi 4-7 IFIEG.'E.-: :31 H INS 49 "~'-r"-'
;:,E _..:, W
I:;' '"'-
._,._,.~:. :34 FEE'/
DS 13, WELL NO,, 23 ~"""
" D.=,.=, ( AMER I CAN B I RECT I ONAL DR ILL I NG )
.~,,~.~ ................................. i-. --~ ~ -- iT'..' '
PRUDHOE BAY, NORTH .=~L[~ F E..:~. ....... ~.~A-;,~;.A
"'"' .-.~ .... 1 F1D, ERILLER: G THIBOBEAUX
~1..-:,.=, ~ ¢) ""-/'-'" !' ' '
RECORD OF SURVEY
-
:> ~) ;20 RADIUS OF r:IIRVATi IRE METHOD
.............. :~ p_~ ..~ ................................................................................ %_.% ..... - ..... -
ARC:Fl ALA.:,P...A, .~ !
·
NU- ..'J'~ h
[.:, i~,~ WEL'L ~-:,~
. - ,
FRUFI...IoE BA~, NoR]'~ !~;'L°PE.,, ALASI<A
C:OMF'UTAT I Oj%! PAGE NO. 1
(AMERICAN DIRECTIONAL DRILLING) TIME DATE - 14: ~ "~s 1 ,_,-i~ v-~=~
.........................................................................................................................................................- ;FRLE;Fi ..............................................................................................................................................................................................................................................................................
f'", "~'! e. · "" DOGLEG
MEASURED DR IF:'T £1-,,IFT COUR::.:E VERTICAL VERTICAL :=,JB;=,EA R E C T A N G U L A R C L Cf .:, U R E
DEF'TH ANGLE DIRECTInN LENI]TH DEPTH .=,bL. FION TVD C IT; 0 R D I N A T E .:, DISTAI',tCE' DIRE..TION SEVERIT
'--FEET n M D M FEET FEET ...... FEET ........... FEET -'FEET ................. FEET D M-' DG/IOOF
O. 0 0 0 0 0. O. O0 0 ,, O0 . '87. O0 0. DO O. O0 0. O0 ,:.}(] 0,, O0
'.:.~.'-~('i ..... 0 .... 0 ............. 0 O' ............. 950; ............. 950'","(~ ................ (.)' ......... 0o' ............ ~" '"-'c./_-..:, ."0 rj ..................... o. oo ............o':'0,.'~. . ' ..... : ....... o . or).. " oc). .... ti. ,' no. ....
~-- ..~'~0 00 0 °1 N 0 54 W 0./:,]~ N 60 0 W 1
100'7. i 1 DS. hi 60 c). W .:, 7 . 1007. O0 O. 61 '= '~ . ..-, . '- -...":' '--'./.
-/. ,-, --:, ~; ~'-"-; 90¢) 2' 4::: =t~ ""'""
1 U ':,,:,, ~ :I ,. N ._ I 0 !,4 6.1, 1067, S.,'7 2, 4. 7 ....... , 97 :1 . c,._,/._, N .'"", 07 W ., N ._, ?:, .-',,:, 14 1 .70
................ c¢'''~ ................ '~'"" ~" .................. 1 · 7._
1168. 4 0 N ...,:."5'-':" 0 14 100. "]. :!./:,7. ,'='1 ...... 7.; ~ 10,:,00 ,=,~ 4';'76'-/',1 /.', "~3 4- "W ....... ~ ............ 7;'".:.'¢3 ' N R?,"'6 'H ................. ~'
' ~'"" 5 ";:i,,'l () ,-, ) ~ ,~, c,..:, N W ,:,
~ ,:,. . 0 N ... W ,:,C, 11 $~7. '72 10. ":"7 1110. 72' /.':,. 17 N ¢,....:,. W 10. 28 5'3 5 '". 37
~4. 7''=;'R ""( ~"' I
1"':"":":' ./.',0 N !5,.,7 0 H .... '" 1'""'
· .:,U 1'"'"" .,..,Y N _l ..t.~, N :37 W ":'
,:, 1.3 I 14 f') '"":';c" .:, =;--,
· .,.:, '7 ,:,)N tO
'"' '=.; '"" "'" ._._-, W 1 ,_. hl 4.4 W -
1....7._ 6 30 N 4.4, () W 4.7 1274.F:0 :I.~'~~ .~.4, :!.1,=,7:30 11 Or4 N 14 =~'" o '.':,':.i ...%'-.'.:. '"'...,
51 N .-0 I W 16
1 ......... o 06,. 6, () Ix) ::~ c) ¢') W :31 ~ 1305 12 21 51 1218 1:7 1 .':' ....... 74 N 1/:, =,.:, = W 21 ~ ~ ;:~ ~':
i n ~ ._l i
..........................j c, ..:.,/. r.:;~ :~I 0 N ~."'" -~ 0 W '~.-', ........... 0. ~ ..:,'-' ._, '~' 4 ...... · ,2.,.y 7 ................ '-"~. ~,, ;"~._, 0 ................. ~ .,::.~'" ....... ~ 7,, '-::'~'~ ' ..... ~ ~,..2,"'*'
.,..? .., ..i tm ,..
?../- * . !: . .
~ . - .. ..-~, ,. ,_. ,,,_.... -- ~ ~...
~'-' c' '= 0 ' ";' '?' '='- ,=. - .-, --::,. ..... · ,.,':,..- ,= ..,c/ ' :' .':-,', 78
14 .... .:,. 0 N E 117,,".,:4~' 14.'--,1,1~.,,., · _ ..:,~. ,=,0,.,? .~1..,64,.1.-, .~ ,.7(2 N .~U.SR W :'::/',, 14 N 34 43 W
1._,7 ..... 10. 2¢~_. N .~:. ._.-, Pi ' .~.~,~;';~;~' .~.~ ~!~..,¢?~,~!,../,~.c'.,,~}'=:c:~;~' .-.~ ~'~:,:i~=; .' '.zH= .... DO,.'~,~;~-
1/'.66, 1 ":' 0 N 4:3 0 W :-1, ~' 1660,, c00 ~ 6,- .., ,..,':-;-; 15 Z._,, .=,U 6.:,. ,-.~,' N ~',. .... ,.:,. ~"~
I ""-' .=:(. N ._,4 0 W 122;:~'~i.:.._~.t7~9..,02., ~; 1.'.. 1~.6.~"2.'~. ()~ !/ :=::3, .3~,: N~i~ili;i,i]~6, ='-' Wi00,5/1. '""- . .,..
............ i- ~.-,,'l'~ ............. ~ 9-- ,.:,. ,=, -- ., .-,,= '%~. ~--;~i ., ~,~;D,,~¢ ,~¢=:,~.~'~.~,.i~;,;? ~iS~.A;~..,::,=,~ "~.~ ~:~'~, - 8,~, W 1'~-._'~..., .- ..... 47; ..... N R9 ...... 1 S'/ ........ W 0. '-' -
.,....,...,. .,...:,0 N ..4. 0 W .~.~..~..~,-~,=,.--~--, .;_"~z;. ~,=,.,.,=,~,._..-, .,. .... ~-,,,-,v ~,~ ,- ..... ' = - · ·
· ' .~..~ N 4.2 I W 1,21
...... 0.. N 1 !
.', ~',k '~.,/. ~, "' . .
.~,..,.,:.. _,, I c, .'::o N Pi 1 0 W 113 .~006 02 1/_-,7.87 1S.,' 1 '.;], 02 126,"
:e;"., ~'c,, .................. ~"-"-'.30 N ~. o. 0 W 1 ..,~':'-',:,. ~"-' 14:~'*. :D' 1 ~=~':'":"-':', 6";,' -2'~')?%"i'L":~ 1'1 60 . ':.-/2 N 1 ..... .-,s,.,..] 84 W .,:;,~4.01 N ,,,,-..+._, w .... , ..-,_,
.d~.l. /.'. ,, .¢.;.'.."., -
· ,.'.. _-,._-,"-',:, ,, oo~,., 30' N ._,C 0 W 1.-=,4. zz:,,,, , 1,=,. .,,:~'¢,"'t:').'... 17 =='--.,"-,r,o... ,... 1 ,=,'-' z,:J, 4 ..... .3:0-N zJ, 7't"' ,54. !,4 29 !.~n.-., N 4..5 .,,.'-.'7 W '"'..:, , ..":'"=,._.
..... --' ' ':'*~ N 270, 17 N :372,7,'-=: N 4.6 27 H 4. 01
--",,.~ ~,c/,.,:, .... .:,4'~ 4..5 t",.I .50 O' N 1.:,6,~ 2417, 95 37:!. . '::'":?.....;, ~.~3.~.'??.:,_ 256 , ,_,.,. ·
.......... ........... ........... n. ...... c ......... .......... ............... i ............. ' ...... ...... .................. ,.-:.-., n ,, 4'-;,=, ................... N '-'..-,4.6. Oo: ..................................... H 471.6 :;' ........................... N 4.7 W 2. '""'":"._,.::,
·
· ":, ~/. ZL'r; ~ ?; ~ ~, ~ t 'T., "~' '"" "~"--" W 3
2781. 4o 0 .N 49 0 W 1,.-7. $/I ,/..-,'~ '-.-/1 .:,7~. '74 N 407 4:3 W.J=='-"._,~ :34. N 47 ,.,,~
. d~[*--I -r ..- ~ ,~1 . ii · ...............
_ ....................................................
....................................
- '" ::,EC.::, H
FIN~'L CLOSURE -' DIREC:TICIN: N 47 DEGS 31 MINo 49 ~'-"='
....................... D I .:,'-"FA Nr':E' .... :' .......... ~ ~:'-"..,._ 4. ............ :34. FEET
ALASKA.
i
~.PTH 2781
· i
STATE OF ALASKA
'%' ALARKA("-~ ,,.._ .. AND GAS CONSERVATION C(~F- .MISSION__
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well E~ Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 82- 08
3. Address 8. APl Number
P. O. Box 360, Anchorage, Alaska 99510 50- 029-02704
4. Location of Well
at surface
2586' FNL, 1659' FEL, Sec. 14, T10N, R14E, UM
5. Elevation in feet (indicate KB. DF etc.) I 6.
87' RKB' L~LDe~.~r~(~n a nd Serial N °'
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
13-23
11. Field and Pool
Prud~oe Bay Field
Prud~oe Oil Pool
January 82
For the Month of ,19__
t12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well @ 0600 hrs, 1/27/82. Drld 17~." hole to 1983', as of 1/31/82.
13. Casing or liner run and quantities of cement, results of pressure tests
20" 9~# H-40 conductor to 118'. Cemented w/300 sx Permafrost cmt.
14. Coring resume and brief description
N/A
15. Logs run and depth where run
None To Date.
,~1 6. DST data, perforating data, shows of H2S, miscellaneous data
N/A
-17. I hereby certify th'at the foregoing is true and correct to the best of my knowledge.
i:SIGNED TITLE_ A¢~.~ Drilling Engineer DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplibate
Rev. 7-1-80
Suggested form to be inserted in each "Active" well folder to d~.eck
for timely compliance with our regulations.
. Operator, Well Nam~ and Number
Reports and Materials to be received by: ~- ~ ~--~
Date
Required Date Received R.emarks
·
·
·
Completion Report Yes'
.
·
~ - ~ i , , , · ,= ,, ,
·
·
Core Chips ·
., ~/~/~ . , ~ ,,
, .,
m, , , , , , , -- ,' '"
InclinatZon Survey .~~
!
Directional Survey y,~_~p/
Drill St~n Test .Reports ffd.~
, , , ,
,
Production Test Report's (,~ff.~.~.y,~,;. _
ARCO Alaska, Inc. (~'
Post Office B0~ 360
Anchorage, Alaska 99510
Telephone 907 277 5637
March 9, 1982
Mr. C. V. Chatterton
Commi ss ioner
State of Alaska
Alaska Oil & Gas Conservation
Commi s s i on
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: "POLESET" Conductor Data
Dear Mr. Chatterton:
As stated in our permits to drill, ARCO Alaska, Inc., would furnish
you with survey data on conductors cemented with poleset material.
The following summarizes the data compiled since the initial use of
poleset.
To date, seven conductors have been foamed in place using poleset
material. These conductors are at Drill Sites 2-19, 13-17, 13-23,
14-30, 15-1, 15-2, and 15-13. Four have been successfully drilled
and completed at Drill Sites 14-30, 15-1, 15-2, and 15-13. Drill
Site 13-23 was abandoned because of an unrelated fishing job.
Drill site 2-19 is being drilled and Drill Site 13-17 is scheduled
to be drilled next month.
All of the four wells completed or near completion have been
surveyed throughout the process of drilling and cementing the
13-3/8" surface casing. The total conductor slippage (downward)
for each well is:
Well Total Slippage Comment
3-5/16" Abandoned.
- 3/8" None.
DS 15-13 1/8" None.
DS 14-30 25-7/8" Conductor slipped 24-3/4"
while landing 13-3/8".
DS 15-2 2" None.
It should be noted that in the past slippage has occurred with
conductors cemented in place. The conductor on DS 15-12 slipped 3"
when landin'g" 13-3/8" casing and 5" when landing 9-5/8" casing. The
conductor on DS 13-10 slipped 12" while landing and cementing
13-3/8" casing.
MAR 1 ? 1982
Alaska Oil & Gas Cons. Commission
,,..co A~aska, ~nc. ~s a Subs~,~rv of At~.ticmo.fie~Com.~,~V · Altchorage
Mr. C. V. Chatterton
March 9, 1982
Page 2
In any instance of noticeable conductor slippage, the conductor is
either Chained or braced to prevent further slippage.
Conductor slippage is not (and will not be) a problem at Prudhoe
Bay. Using poleset has proved both economically and structurally
successful and we are confident that it will continue to be such.
Attached is an example of survey data taken on Drill Sites 15-1,
15-13, 13-23, and 14-30.
Sincerely,
ARCO Alaska, Inc.
M. A. Major
Area Drilling Engineer
North Slope District Drilling
MAM:KJG/hr 1
Attachment
GRI1/B6/7
P.9.7.3
RE£EI E )
MAR
Oil & Gas Cons. Comm~sio~
D;~
&Z ,~'V'.
_
45. (.2.0
.....
40. ~z
DE S*G~ E O
p. S. I$/2S
WOttDUmTOt% dd~ ~ Ima-t~6m -
p.. gu.Baa/./..
' D. FIZ. U~I
~AR 1 ? 1982
Oil & Gas Cons, Commission
~,nchorage
·
............ :F .... I III i I _ L I -
~ATA
_
~... 5:'~o ~.,'4 48. & Z
..
·
' ~:~0 P~W +6.(,Z'
I, 500 /
u q :30 Pt4 .'lb.
,/,~g>6:>/
"' q :50 AM ~8 . ~2
~ I :SO ?~ 4bX,3
,9:..9,0 PM
4qb5 '
2, I00 '
" ~:~0 p/q .qb.
~' 9 :.%9 PM 4~. bz6
..
Z~ l/&t I:$o Xzf '¥b.&25 .
-- .
2, B6,0'
RE£EIYEI '-
MAR i 7 1982 ·
Al~Sk~- 0il & Gas Cons, Commission
Anchorage o
..
RECEIVE'I)"
MAR 1 ? ]982
,,.,
·
o, ~ ~s c~.s.
~cho~,~ . I
ARCO-&laska¢lnc.
~Post Office B(~Ir ~0
Anchorage, Al~,~a 995 i 0
Telephone '907 277 5637
February 22, 1982
Mr. C. V. Chatterton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject- State Reports
Dear Sir'
Enclosed please find Well Completion Reports for the following
drill sites'
11-6, 12-4A, 13-19, 14-9A, 14-26, 15-15,
lA-12, lA-13, and B-11GI.
Also included are Monthly Reports for January on drill sites'
13-20,~14-30, 15-1, and lA-14.
Sincere ly,
P. A. VanDusen
District Drilling F, ngineer
Enclosures
PAV/GLA' sms
ARCO Alaska. Inc. is a Subs~di.ry of A[lanticRichfieldCompany
DS 13-23
Drilling History
NU 20" Diverter.
Spudded well @ 0600 hrs, 1/27/82.
Drld 17½" hole to 1983' as of 1/31/82
RECEIVED:
F E B 2 L, ~.982
A!3ska 0il & Gas Cons. Commissioi~
Anchorage
ALASKA ~LAND GAS CONSERVATION CO~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL
2. Name of Operator
COMPLETED WELL []
7. Permit No.
OTHER []
ARCO Alaska, Inc.
3. Address
P.O. Box 360 Anchorage, Alaska 99510
4. Location of Well
2586' FNL, 1659' FEL, Sec 14, TiON, R14E, Um (Surf)
5. Elevation in feet (indicate KB, DF, etc.)
-- 87' RKB
12.
82-08
8. APl Number
50- 029-02704
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
DS 13-23
11. Field and Pool
Prudhoe Bay Field
6. Lease Designation and Serial No. Prudhoe 0i 1 Pool
ADL 28312
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) - (Submit in Duplicate)
Perforate [] Alter Casing. [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment [~X
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Subject well was directionally drilled to a TD of 2851' MD (2700' TVD). Prior to
running 13 3/8" casing, the drilling string backed off leaving 2257' of drilling
assemblY in the hole, top at 584', bottom at 2841'. After several unsuccessful days
fishing, verbal approval was obtained from Mr. Wondzell, February 4, to abandon the
wellbore. Cemented surface hole 1007' to surface with 4500 sx Arcticset III, total
volume 1025 bbls. CIP @ 0300 2/6/82. Bradenhead will be cut off, a plate welded on,
and a standard abandonment monument erected.
RECEIVED
FEB 0 9 ]982
Alaska Oil & Gas Cons. Comnlissi
Anchorage
14. I hereby certify._th.~.l;, the foj;,egoing is true and correct to the best of my knowledge.
Signed ' .- "" ~' " ~ ~ -- - Title
The space below for C, ommission use
Date
Conditions of Approval, if any:
Approved by
ORIG~TtAI. $1GIIEB
BY :.~?,E C. ,SMITfl
8¥ Order of
COMMISSION[R the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
January 21, 1952
Mr. Charles lt. ]toss
Senior Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 360
Anchorat~e, Alaska 99510
Prudhoe Bay Unit DS 13-23
ARCO Alaska, Inc.
Pemit No. 82-8
Sur. Loc. 2586tFt/L, 1659'rEt, Sec 14, T10N, RI4E, ~.
Bottomhole Loe~ 3026'FSL, 3182'FBL, Sec 10, T10N, RI4E,
Dear ~. Ross:
Enclosed is the approved application for permit to drill the
above referenced well-
Well samples and a mud log are not required. A continuous
directional survey is ,required as per 20. AAC 25.050(b)(5). If
available, a tape containing'the digitized log inforraation
shall be submitted on all logS: for copying except experimental
logs, velocity surveys and dilm~eter surveys,
Many rivers in Alaska and their drainage systems have been
classified as impor, tant fo~ the spawnin~ or ~i~ration of
anadromous'~ftsh. Operations in. these areas are subject to
AS 16.05.870 and the regulations promulgated thereunder
(Title 5, AlaSka Administrative Code). Prior to eommenein~
o~erattons you may be contacted by the Habitat Coordinator's
Offiee, iDepartment of Fish and Game
.
Pol lUtion'~of any waters of the State is prohibited by AS 46,
Chapter 3, Article ? and the re~lations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter ?0) and by the
Federal Water Pollution control Act, as amended. Prior to
eommenctn~ operatiOns you w~y be contacted by a representative
of the Department of Environmental Conservation.
Prudhoe Bay Uni, · 13-2:3
--2--¸
lanuary i~l. 1982
To aid us in scheduling field work. we would appreciate your
notifyint~ this office within 48 hours after the well is spudded.
We would also like to be notified so that a representative of
'the Coha~ission may be present to witness testing of blowout
preventer equipment before surface oasin~ shoe is drilled.
In the event of suspension or abandonment, please t~ive this
office adequate advance notification so that we may have a
wi tness present,
Ver~y truly yours,
Chat t
Chairman of BY ORDER OF THt!
Alaska Oil and Gas Conserv:at ion ~ission
~nc I o sure
Department of Fish &: Game, itabitat Section w/o anal.
· Depart.ment of Environmental Conservation w/o anal,
CVC~be
ARCO Alaska, Inc.
Post OfficeB~,, 360
Anchorage, Alaska 99510
Telephone 907 277 5637
January 13, 1982
Mr. Hoyle Hamilton
State of Alagka
Alaska Oil & Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Subject:~S13r231Permit to Drill
Dear Sir:
Please refer to our letter of December 28, 1981 requesting a
Permit to Drill for the subject well. Confirming myJanuary 8
telecon withMr. Wondzell, there are no wells within 200' of DS
13-23.
C. E..Ross
Sr. Drilling Engineer
cc:CER:kh
JAN 1 8 1982
0it & Gas Cons. Commission
/~chorage
ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany
ARCO Alaska, Inc.['I
Post Office I~ 360
Anchorage, Alaska 99510
Telephone 907 277 5637
December 28, 1981
Mr. Hoyle Hamilton
State of Alaska
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: DS 13-23 Permit to Drill
Dear Sir'
Enclosed please find our application for Permit to Drill DS 13-23
and the re~.uired $100 filing.~fee. Attachments to the application
include an'~'~s-built drawing,~.a plat ~.etailing the section and
plan views of the proposed wellbore,~ proximity plat showing the
subject wellbore's position to the nearest well drilled, and a
sketch and description of the BOP equipment and testing procedure,
including anticipated pressures. A surface hole diverter system
will be used on this well. Polyset, polyurethane foam will be
used to Cement the surface conductor. A complete description is
attached'.
As we anticipated spudding this well on or around January 15, 1982,
your prompt review of this application would be greatly appreciated.
Very truly yours,
~~__.n~j/,Eng i neer
CER:ltc
Attachments
RECEIVED
DEC2 9 1981
Nes~ 0~t & Gas Cons. Commission
Nmhorage
ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
PERMIT TO DRILL
20 AAC 25.0O5
la. Type of work. DRILL [] lb. Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC []
REDRILL [] DEVELOPMENT OIL [] SINGLE ZONE []
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2. Name of operator
ARCO Alaska, Inc.
3. Address
P.O. Box 360, Anchorage, Alaska 99510
.__
4. Location of well at surface 9. Unit or lease name
2586'FNL,' 1659'FEL, Sec. 14, T10N, RI4E, UM Prudhoe Bay Unit
At top of proposed producing interval 10. Well number
2572'FSL, 2703'FEL, Sec. lO, TION, RI4E, UM DS 13-23
At total depth 11. Field and pool
3026'FSL, 3283'FEL, Sec. 10, TION, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Prudhoe 0i 1 Pool
87' RKBI ADL 28312
12. Bond irff.ormation (see 30 AAC 25.025)
Type Statewide Surety and/or number Fed, Ins, Co. #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
NE Deadhorse, AK 6 re,es 2703 feet well 1812 feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
1401 9'MD, 9468' TVD feet 2560 1/15/82
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3799 psig@ .Surface ' '
KICK OFF POINT_+1900feet. MAXIMUM HOLE ANGLE 55°I (see 20 AAC 25.035 (c) (2) 4599 psig@ _C)g~_~ ft. TD (TVD)
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
30 20 94 H-40 Welded 86 35 I 35 121 ~ 121 Poleset *
17½ 13-3/8 72 H-80 Butt 26'16 34 ~' 34 2660~
i I2660 2300sx Fondu & 400sx
12½ 9-5/8 47 L-80 Butt 12,709 33 ~ 33 12,7091 8713 Stg 1 - 250sx Class "~
S00-95 Butt ~ i S tg 2 - 300sx PF 1
8½ 7 29 L-80 Butt 1453 12,403 ~, 8540 14,019~ 9468 400sx ClasS '"G"'
,
22. Describe proposed program:
ARCO Alaska, Inc. proposed to directionally drill this well to 14,419'MD (9468'TVD) to
'produce the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8"
5000 psi RSRRA BOP stack will be installed and tested to 5000 psi. The BOP equipment
will be pressure tested each week and operationally tested each trip. A string of 5½"
!7#, L-80 tubing, packer and necessary provisions for subsurface safety equipment will
be run. A non-freezing fluid will be left in all uncemented annuli within the perma-
frost interval. The packer will be set above the Sadlerochit. A separate Sundry Notice
will be submitted when the well is to be perforated. ~EI, VED
· Additional '~escrip~n.-,., , ,- -~ -of Poleset attached. DEC2 9 198t
//J~ /' / //' ~,~' Alaska Oil & Gas Cons. Commissio,/
SIGNEE~//J~,~_ ~ TIT'LESr. Drilling Engir~]~rage DATE
The spa m~on use
CONDITIONS OF APPROVAL
i
Samples required Mud Icg required Directional Survey required APl number
[]YES [~O []YES [~.O [~YES []NO 50_ ~ 7-. ~ ~~
Permit number -- Approval date '
<%¢,,- ~q 01/31/$3 [ SEE COVER LETTER FOR OTHER REQUIREMENTS
,
APPROVED BY ,COMMISSIONER DATE ,],~rli]~l~d' 21~
by order of the Commission
Form 10-401 Submit in triplicate
Rev. 7-1-80
~d) Z/Od)
0 ~-o
II
12
WE",~T
PROI'R~CTE'D
14, TIO. N
O.$. 13 DRILL POINT LOCRTIOHS
1'; .... 17
LRT= 70 13
LONG=I4$ 3e
Y=~,~32,603.~
X= 6S6,$6~.~Z
13/23
LRT= 70 1'3 16.247
LONG=148 3e
Y=5,932,720. . 07
X= 655,538.17
NOTE:
1.
.
SP COOR.OINRTES FIRE
RLIIt.SI(IR ZONE 4
DISTRNCE$ RRE SURFRCE
RECElYED
DEC2 9 1981
Alaska Oil & Gas Cons. Commission
Anchorage
II I iii II II III IIII I __ II I II ~ III
D~ILL ~IT~ 13, WE'LL'5 17 ~ 25 A'5-'STAKDD
' "" '""' '" o i~,"~;;' ,~),'%, .....
GaS Compa
ARCO. Oil and. ny
NORTH ALASKA DISTRICT. PRUOHOE BAY Nu
II I I II I I I IIII IIII I I IIIII __
SURFACE DiVERTER SYSTEM
L.
5.-RIG DRILLING RISER
6. ].0" LINES TO SUMP
ANNULAR
PREVE~;TER
)
BLIND RAMS
PIPE RAMS
SPOOL
PIPE RAMS
13-5/8" BOP STACK DIAGRAM
Accumulator Capacity Test
1. Check and fill accumulator reservoir to proper
level with hydraulic fluid.
2. Assure that accumulator pressure is 3000 psi
with 1500 psi downstream of the regulator.
3. Observe time, then close all units simultane-
ously and record the time and pressure remaining
after all units are closed with charging pump
off.
4. Record on IADC report. (The acceptable lower
limit is 45 seconds closing time and 1200
psi remaining pressure.
13-5/8" BOP Stack Test
1. Fill BOP stack and manifold with a non-freezing
liquid.
2. Check that all hold down screws are fully
retracted. Mark running joint with predeter-
mined plug seating depth. Run test plug on
drill pipe and seat in wellhead. Run in lock
down screws.
3. Close annular preventer and chokes and bypass
valves on manifold.
4. In each of the following tests, first hold
a 250 psi low pressure test for a minimum of
3 minutes, then test at the high pressure.
5. Increase presure to 3000 psi and hold for a
minimum of 3 minutes. Bleed pressure to zero.
6. Open annular preventer and close top set of
pipe rams. Increase pressure to 5000 psi
and ~old for at least 3 minutes· Bleed pres-
sure to zero.
7. Close valves directly upstream of chokes and
open chokes. Increase pressure to 5000 psi
& hold for at least 3 minutes. Bleed pressure
to zero.
8. Open top set of pipe rams then close bottom set
of pipe rams. Increase pressure to 5000 psi
below the bottom set of pipe rams and hold for
at least 3 minutes.
· 9. Test remaining untested manifold valves (if
any) with 5000 psi upstream 'of valve and zero
pressure downstream.
10. Bleed pressure to ze6o. Open bottom set of pipe
rams.
11. Back off running joint and pull out of hole.
Close blind rams and test to 5000 psi for at
least 3 minutes.
12. Bleed pressure off all equipment. Open blind
rams. Make sure manifold and lines are full of
non-freezing liquid and all valves are set in
drilling position.
13. Test standpipe valves to 5000 psi.
14.
15.
16.
17.
Test Kelly cocks and inside BOP to 5000 psi wi~l~
Koomey pump.
Check operation of Degasser.
Record test information on blowout preventerS..
test form. Sign and send to Drilling Super-
V1sor.
Perform complete BOPE test once a week and
functionally operate BOPE daily.
Rev.
Poleset Backfill Cement
DESCRIPTION'
Poleset is a high density modified polyurethane foam developed for backfilling
wood, concrete and steel poles and pilings. The 2:1 ratio formula was developed
especially for application in extremely cold climates and also in soil with high
moisture content. When mixed together an exothermic reaction occurs causing the
two chemicals to foam, expand 13 to 15 times in volume and bond with the pole
or conductor (depending on application) regardless of the material. The resulting
foam will exhibit the following characteristics:
Mechanical Properti es:
Compressive Strength
Tensile Strength
Minimum Shear Strength
Denisty (foam)
75-100 psi
30 psi
38 psi
7.2 lb/ft3
N~)TE' The above can be varied per specification requirements.
Thermal Conductivity.
Temperature Range:
BTU
K = .27 HR FtOF
Upper = 225OF
-Lower: -300OF
Quantity Per Typical Conductor-
30" Hole - 20" dia. Conductor .- 80' deep.
~,7~- 3
:~.-4984-ft /ft x 80' :-L-~/~ft3
272 ft3 X 7.2 lb/ft3 = 1960#.
1960# ( 9.7 lb/gal = 202 gal.
202 gal ( 42 gal/bbl = 4.8 bbl.
4.8 bbl unexpanded foam will completely cement conductor in place.
'SUBJECT:
OBJECTIVE:
DS 2-19 conductor cementing with Poleset (a Polyurethance system).
I CEIV o.
1. Improved freeze - thaw protection. ~)KLC2 9198]
2. Improved back fill bonding between conductor and forma~a~.Oil&GasOons, coFaral$$ion
Anchorage
3. Improved reliability of conductor ~nst~ll~t~on during surfece
hole drilling.
e
Simplified cementing coupled with decreased conductor cementing
cost.
INSTALLATI ON'
1. Drill standard size conductor hole.
2. Make up standard size (diameter & length) conductor pipe.
e
Cement in place with Poleset through hose or pipe down side of
conductor or drop Poleset from surface.
e
Bring Poleset up to within two feet of cellar floor. Back fill
with Redi mix to cellar floor.
TESTING- (tenative program)
·
Shoot elevation as follows-
a. After weld-on-head is installed.
b. Just before installing diverter.
c. After installing diverter and just before spudding.
d. Every four hours during spudding, landing 13-3/8" casing and
until 24 hours after cementing 13-3/8" casing or longer if
there is noticable movement.
e
Make appropriate observations during Poleset placement and during.
drilling operation.
CONTINGENCY PLAN'
·
Should the cementing of the conductor with Poleset prior to spudding
be deemed unsatisfactory, the test. will be canceled and a new con-
ductor set adjacent to the test wil'l be set using standard setting
and cementing methods and materials.
·
Provisions will be made to loosely (initially with l' of slack in
chains or cables) tie the conductor to the rig's sub during spudding
operation. Should conductor fail during spudding, it should be
secured to the subbase and surface hole completed as soon as possible.
RECEIVED
DEC2 9 1981
Al~s~ Oil A Gas Cons, Commission
tmchorag~
CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
(1) Fee
(3) Admin ~~,, / ~""~ ~.~
(ythru 11)
(4) Casg ~~ Ih~/8~
(12 thru 20)
(5)
(6) Add:
Company
Lease & Well No. ~r~AO~
.9°
10.
11.
1. Is the permit fee attached .........................................
YES NO
2. Is well to be located in a defined pool .............................
3. Is well located proper distance from property line ........ [ ....
4. Is Well located proper distance from other wells ..11 . .[1 .....
5. Is sufficient undedicated acreage .available in this pool ............ ~. ~
6. Is well to be deviated and is well bore plat included ..... 4 ....
7. Is operator the only affeCted party ................ ~ 1[i i ii [ i' '1 i[-.~ //~L
8. Can permit be approved before ten-day wait "i ........ !1 '
Does operator have a bond in force . ................
Is a conservation order needed ........... , .......... ~'~
Is administrative approval needed ................... ·.
12.
13.
14.
15.
16.
17.
18.
19.
20.
2I.
22.
23.
24.
REMARKS
Is conductor string provided -
Is enough cement used to circulate on conductor and surface .....
Will cement tie in surface and intermediate or production str~'~ ..
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones .......................
Will all casing give adequate safety in collapse, tension and burst.
Is this well to be kicked off from an existing wellbore .............
Is old 'wellbore abandonment procedure included on ~0-403 ............
Is adequate well bore separation proposed ...........................
Is a diverter system required .......................................
Are necessary diagrams of diverter and BOP equipment attached .......
Does BOPE have sufficient pressure rating - Test to ~ooo psig .
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
25. Additional requirements ............................................. ~
,,
Additional' Remarks:
Geology: Engineering:
WVA~ JK~RAD ~
JAL ~ ' -
rev: 03/10/81
INIT IAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
·