Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout182-109PLUGGING
& LocATION
'CLEARANCE
REPORT
State of Alaska
:
· ALASKA OIL & ~AS 'CONSERVATION COMMISSION
·
·
·
· ' ' . ': PTD No. BL-o~
· .
Lease
Spud:
.
Note casing size, wt, depth, cmt vol, '&.ProCedure.
.
.
· .
Abnd Date
·
~,~a'" Completed
Review the well file, and.'comment on plugging, well head
status, and location clearance -.provide loc. clear, code.
Plugs:
Well head Cut off:
Marker post or Plate:
Location 'Clearance:
Conclusions:
Code
Si~ned
Date
o,/=/%
"'--" STATE OF ALASKA ?"-"~
ALASKA OIL AND GAS CONSERVATIOI,,, COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED D( SERVICE [] Pluaaed back far redrill
,,
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 82-109
3. Address 8. APl Number
p. 0. Box 196612, Anchorage, Alaska 99519-6612 .50-029-20776
4. Location of well at surface 9. Unit or Lease Name
1184' SNL, 161' WEL, SEC. 24, T11N, R14E 7,O¢,ATIOI~ ~ Prudhoe Bay Unit
At Top Producing Interval i 10. Weft Number
18-3
1314' NSL, 991' WEL, SEC. 24, T11N, R14E ~I
At Total Depth 'i 11. Field and Pool
~ . Prudhoe Bay Field/Prudhoe Bay Pool
1110' NSL, 1072' WEL, SEC. 24, T11N, R14E
,
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 46' ] ADL 28307
I
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ,15. Water Depth, if offshore J16. No. of Completions
7/30/82 8/12/82 1/25/95I IN/A feet MSL Zero
'17. Totat Depth (MD+TVD)9685, MD/8894' mvo 18' Plug Back Depth (MD+TVD)19' Directi°nal SurveY7745' MD/7126' TVD YES [] NO [] 120' Depth whore sSSV setNOne feet MD 11' Thickness °f Permafr°s t1900' (Approx.)
22. Type Electric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/Cai, CNL/GR, CBL, Gyro
23. CASING, UNER AND CEMENTING RECORD
, ,
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 . SurfaCe 110' 30" 2940 # Poleset
13-3/8" 72# L-80 SUrface 2600' 17-1/2" 2400 sx Fondu/400 sx PF 'C'
9-5/8" 47# L-80/S0095 Surface 8918' 12-1/4" 500 sx "G'Y300 sx PF "C"
7" 29# L-80 8587' 9665' 8-1/2" 340 sx Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None None 8536'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
7920'-9622' 241 CU ft Class "G"-squeezed to 3400 psi
7920' EZSV
7745'-7920' 194 cu fi Class "G"-squeezed to 1800 psi
27. PRODUCT]ON TEST
Date First Production JMethod of Operation (Flowing, gas lift, etc.)
Not on Production I N/A
Date of Test Hours Tested 3RODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE IGAS-OIL RATIO
I-EST PERIOD ~
I
Flow Tubing Casing Pressure 3ALCULATED OIL,BBL GAS-MCF iNATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Brief description of lithOlogy, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
MAR 20 1995
Ataska ~Jil & Gas Cons. Commission
Anchora~
,, ,
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sadlerochit 9060' 8309'
GOC 9404' 8630'
Base Sadlerochit 9579' 8794'
RECEIVED
/ AR 2 0
AJaska Oil & Gas Col~s.
31. L!ST OF A'I-I'ACHMENTS AflChora? .......
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~'~~ ~~ ...TitleDril/in_oEn_aineerSuoervisor Date ,,~ "/~' -~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, obServation, injection for in-situ combustion.
item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24 · If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
.WELL: DS 18-3
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
DAILY OPERATIONS
PAGE: i
ACCEPT: 01/17/95 01:30
SPUD:
-RELEASE:
OPERATION:
DRLG RIG: NABORS 2ES
WO/C RIG: NABORS 2ES
01/17/95 ( 1)
TD: 9685
PB: 9622
01/18/95 (2)
TD: 9685
PB: 9622
01/'19/95 ( 3)
TD: 9685
PB: 9622
RIGGING UP TO KILL WELL MW: 0.0
MOVE RIG FROM F-17A TO DS 18-3A. RIG UP ON 18-3A. ACCEPT
RIG FOR OPERATIONS @ 0130 HRS ON 01/17/95. TAKE ON
SEAWATER; HOOK UP TO TREE FOR WELL KILL. BEGIN BLEEDING
ANNULUS PRESSURE; DRY GAS IN IA. RIGGING UP TO PULL BPV
USING DSM LUBRICATOR. RIGGING UP TO TEST 9 5/8" PACKOFF
ASSEMBLY.
RIGGING UP TO PULL BPV MW: 0.0
TEST PACKOFF, OK. PULL BPV-750 ON TUBING. TEST LINES.
BLEED DRY GAS OFF IA. FILL ANNULUS WHILE OBSERVING TUBING
AND PREPARING TO PICK UP IBP. CHANGED GAUGE ON OA. R/U'
ATLAS AND BAKER IBP. PUMPED '120 SEAWATER DOWN TBG.
OBSERVE WELL. RIH W/ IBP AND SET @ 8000' TEST. POH & RD
~ATLAS. SET BPV. ND TREE AND FUNCTION LDO. NU BOPS. TEST
BOPS AGAINST L/J. BOLJAND R/D TESTING EQUIPMENT. R/U DSM
LUBRICATOR TO PULL BPV.
POH W/ 3 1/2" TBG MW: 0.0
FINISH PULLING BPV. R/D LUBRICATOR. R/U HALLIBURTON
SLICKLINEAND LUB. TEST AND RIH W/ BAKER EQUALIZING PRONG.
HAD DIFFICULTY @ SSSV; POH AND LD OIL JARS OUT OF TOOL
STRING. RIH W/ PRONG AND TAG IBP. SHIFT EQUAL SLEEVE ON
IBP; ABLE TO PUMP THROUGH IBP. HAD TO WORK TOOL BACK
THROUGH SSSV W/ DIFFICULTY. R/D SLICKLINE UNIT. MU
LANDING JOINT. BOLDS AND ALIGNMENT PIN. WORK TBG. RU
ATLAS WIRELINE AND RIH W/ JET CUTTER. POSITION TOOLS TO
CUT TBG @ 7934'. POH AND RD ATLAS. HAD TO WORK TOOLS PAST
SSSV W/ RIG PUMP. MU LJ AND PULL HANGER TO FLOOR. PULLED
FREE. LOTS OF OIL IN ANNULUS. LD HGR AND LANDING JOINT.
FREED CIM LINES OVER WINDWALLS TO LARGE SPOOLER ON CAMCO
TRUCK. SPOOL REGULAR LINES ON RIG FLOOR SPOOLER. POH W/ 3
1/2", 9.3, L-80 EUE 8 RD TBG. NORM'ED 1ST 33 JOINTS.
RECEIVED
MAR 20 1995
A.laska 0il & Gas Cons. Commission
Anchom,?
WELL : DS 18-3 ~
OPERATION:
RIG : NABORS 2ES
PAGE: 2
01/20/95 (4)
TD: 9685
PB: 9622
01/21/95 ( 5)
TD: 9685
PB: 9622
01/22/95 (6)
TD: 9685
PB: 9622
JARRING ON TBG AND PBR MW: 0.0
POH W/ 3 1/2" 8RD TBG AND DOUBLE ENCAPSULATED CIM LINE.
SPOOLING LINE OUTSIDE OF RIG ONTO BIG SPOOL. NORM TEST
NEGATIVE ON EARLY JTS. RECOVERED 256 JTS TBG. FLARE ON
CUT JOINT + 4 1/16" AND EVEN. CIM LINE WAS +/- 100' LONGER
THAN TBG, BUT LOOKED LIKE IT HAD BEEN STRECHED AND THEN
PULLED IN TWO. RECOVERED 256 CIM CLAMPS AND 7 SS BANDS.
CLEAR FLOOR AND INSTALL TEST PLUG. TESTED LPR'S, BR'S, AND
SAFETY VALVES. PU FISHING ASSY AND RIH PICKING UP 4 1/2"
DRILL PIPE. BREAK CIRC. TAG TOF @ 7938' DPM. poLISH TOF
AND SWALLOW W/ HOLLOWMILLAND OVERSHOT. GOOD GRAB; BEGIN
JARRING. NO MOVEMENT.
POH W/ BHA #2 MW: 0.0
JARRING ON FISH W/ LOADS UP TO 375K. NO MOVEMENT.
ATTEMPTED RT HAND TURNS TO RELEASE A LATCH; GRAPPLE BROKE
LOOSE. RE-TAGGED FISH TO CONFIRM; COULD NOT GET ANOTHER
BITE. CBU. MONITOR WELL. POH; BRAKES NEEDED ADJUSTING.
SLIP DRILLING LINE; ADJUST BRAKES AND ROLLERS. POH TO BHA.
LD BHA. RECOVERED A 6" PIECE OF CIM LINE. GRAPPLE NOT
BROKEN, BUT TEETH BURNT. MU BHA #2. LD PUMPOUT SUB, JARS,
ACCELERATOR AND PU DOUBLE BOWL AND EXTENSION. RIH; TAG
FISH @ 7938". 'RU HES SLICKLINE AND RIH TO PULL IBP - NO
JOY. RIH W/ LIB SHOWED SCALED AND SAND'ON TOP OF IBP W/
SMALL SIDE IMPRESSION OF TBG . BOTH RUNS MADE IT TO
7960'.R/D HES. GRAB FISH W/ KELLY AND WORK PIPE AFTER 16
RD'S IH TORQUE. GRAPPLES SLIPPED OFF. SET BACK KELLY AND
WORK TORQUE DOWN W/ TONGS. BLIND BACKOFF AFTER 23 RD'S.
LH TORQUE. CIRC. POH W/ BHA #2.
POH W/ BHA #4 MW: 0.0
POH W/.BHA #2. LEFT BOTTOM GUIDE, BOWL AND BUSHING IN
HOLE. BOWL AND EST SUB THAT CAME OUT OF THE HOLE WERE
HALFWAY BACKED OFF. BUILD LEFT HANDED BUSHING FOR
TRI-STATE REVERSING TOOL. MU BHA #3 AND RIH. TAG FISH @
7928'. WORK OVER FISH EASILY. WORK 14 - 23 ROUNDS OF
TORQUE INTO STRING 3 TIMES; GRAPPLE SLIPPED THEN QUIT
BITING. CBU. MONITOR WELL. POH. CHANGE OVERSHOT TO 3
1/4" GRAPPLE AND REPLACE 7 CARBIDE BUTTONS ON REV TOOL.
RIH TO 2280'. SLIP AND CUT DRILLING LINE. WELL HAS
CONTINUED STABLE LOSSES. RIH W. BHA #4. TAGGED FISH @
7938'_ SWALLOW AND GRAB FISH. ATTEMPT TURNS; APPEARS THAT
TOOL IS FREEWHEELING. AND TORQUE IS NOT WORKING ON FISH.
REMOVED WASHPIPE, DROPPED BALL AND RELEASED GRAPPLE. POH
w/ BHA #4.
RECEIVED
At~ska Oil & Gas Cons. Commission
Anchora ~ : ~.
OPERATION:
RIG : NABORS 2~
PAGE: 3
01/23/95 (7)
TD: 9685
PB: 9622
01/24/95 ( 8)
TD: 9685
PB: 9622
01/25/95 (9)
TD: 9685
PB: 9622
RIH W/ EZ DRILL RETAINER MW: 0.0
POH; WET TRIP. HANDLE BHA; SERVICE REVERSING TOOL. HAD TO
REPLACE ALL 12 CARBIDES; INSTALLED.GRAPPLE. RIH.
SWALLOWED AND ENGAGED FISH GOOD BITE. ATTEMPT BACKOFF.
TRIED TO GET BACKOFF 3 TIMES, GRAPPLE WOULD'NT HOLD ANY
MORE. POH. LD REV TOOL AND PU DOUBLE BOWL OVERSHOT, JARS
AND INTENSIFIER. RIH; ENGAGE FISH. JAR TO 375K, NO
MOVEMENT OR PIPE SEPERATION. DISPLACE HIGH SOLIDS PILL
THROUGH FISH WHILE ENGAGED W/ DOUBLE OVERSHOT SEALS.
GETTING RETURNS DURING DISPLACEMENT. CLOSED ANNULAR.
PRESSURE WHILE PUMPING PILL DOWN STRING. PRESS WENT TO
1750 PSI WHEN PILL WAS GOING THROUGH FISH. DISPLACED PILL
TO 7" LINER JUST ABOVE PERFS. POH W/ BHA #6. LD ALL
FISHING TOOLS. HOLE NOT TAKING FLUID ANY MORE, WELL
STABLE. PU HES EZ-DRILL RETAINER AND RIH ON DRILLPIPE.
CUTTING SECTION MW: 0.0
RIH W/ EZSV TO 7920'. BREAK CIRC, SLIP DRLG LINE WHILE
CIRC. CLOSE ANNULAR AND INJ 50 BBLS SEAWATER. SET EZSV @
7920' ESTABLISH INJ RATES. TEST CASING. PUMP 5 BBLS WATER,
TEST LINES. PUMPED 43 BBLS SLURRY AND 10 BBLS WATER BEFORE
SWITCHING TO RIG PUMPS AND DISPLACING CEMENT TO
PERFORATIONS THROUGH TUBING. SAW GOOD INDICATIONS OF
CEMENT BOTH THROUGH TUBING BLOCKAGES AND WHEN CEMENT
REACHED PERFS. UNSTING AND REV CIRCA DRILLPIPE VOLUME.
NO CEMENT RETURNS. DISPLACE WELL TO MILLING FLUID AFTER
PUMPING 20 BBL HIGH VIS SPACER. ROTATED GOOD DISP. POH.
LD EZSV STINGER; PU MILLMASTER AND 15 HWDP. RIH TO 7920'.
TAGGED EZSV @ 7920'. FILLED PIPE @4432' WHILE RIH. SPOT
15 BBLS 18 PPG MUD ON BOTTOM. POH 2 STDS AND BEGIN CUTTING
WINDOW. MILL 9 5/8" WINDOW 7740-7787'.
PICKING UP BHA MW: 0.0
MILLED WINDOW TO 7790'. PUMP 20 BBL KCL WATER SWEEP; POH
TO SHOE AND CBU UNTIL SHAKERS CLEANED UP. POH W/ MILLING
ASSY AND LD MILLMASTER. CLEAR RIG FLOOR. RIH W/ OPEN
ENDED 4 1/2" DRILL PIPE. WASH THROUGH WINDOW TO EZSV @
7920'. PHASE III REQUIRED CONVOY TRAFFIC DELAYED BJ'S
ARRIVAL BY 3-4 HRS HOOK UP BJ AND BATCH MIX. PUMP 5 BBLS
WATER, TEST LINES. CIRC DP VOLUME BEFORE CLOSING ANNULAR
AND BEGINNING SQUEEZE JOB. POH AND LD MULESHOE. PICK UP
JETT SUB AND FLUSH OUT BOP STACK AND WELLHEAD AREA. PULL.
WEAR BUSHING. PULL 9 5/8" PACKOFF. PU MILLED TOOTH BIT
AND STEERABLE BHA W/ SPERRY SUN HAND TO PROVIDE WEIGHT FOR
STORM PACKER.
RECEIVED
MAR 20 1995
Alaska Oil & Gas Cons. Commission
Anchora~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon X Suspend ~ Operation Shutdown __ Re-enter suspended well __
Alter casing __ Repair well Plugging X Time extension Stimulate __
Change approved program X Pull tubing __ Variance Perforate __ Other
Plugback flRedrill,... REV, #1
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KB=46.15 feet
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface 8.
1184' SNL, 161' WEL, Sec. 24, T11N, R14E
At top of productive interval
1314' NSL, 991' WEL, Sec. 24, T11N, R 14E
At effective depth
1129' NSL, 1072' WEL, Sec. 24, T11N, R14E
At total depth
1110' NSL, 1072' WEL, Sec. 24, T11N, R14E
Well number
18-3
9. Permit number
10. APl number
50- 029-2O776 ~
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
9685 feet Plugs (measured)
8894 feet
9622 feet Junk (measured)
8835 feet
ORIGINAL
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented
80' 20" 2940 # Poleset
2554' 13-3/8" 2400 sx Fondu & 400 sx PF
8872' 9-5/8" 500 SX "G" & 300 sx "C"
1078' 7" 340 SX Class "G"
measured 9549'- 9579' (Open)
9520' 9530', 9540'-9549', 9579'-9580' (Squeezed)
true vertical 8767' - 8795' (Open)
8740' - 8749', 8758'- 8767', 8795'- 8796' (Squeezed)
Tubing (size, grade, and measured depth) 3-1/2" L-80 tubing to 8651' MD
Measured depth
True vertical depth
110' 110'
2600' 2600'
8918' 8178'
9665' 8875'
RECEIVED
JAN - 9 1995
Alaska 0il & Gas Cons. Commission
Anchor~_' '~
Packers and SSSV (type and measured depth) BOT 3-H packer @ 8536' MD; 3-1/2" Camco TRDP-1A SSSV @2208' MD
13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch
14. Estimated date for cOmmencing operation
1/10/95
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas~
Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~/~'~ Title Drilling Engineer Supervisor
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so rePre~sentative may witness
Plug integrity ?' BOP Test __ Location clearance __
Mechanical Integrity Test __ SuJ~s.eque~t,[.qrm re, q~red 10- /~(P ~'
urlglnal lgnea uy
David W. Johnston
Approved by order of the Commission
Date //~/'~ ,,~'
/
Approval No.
Approve(~ Copy
, Returned
Commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
BP
EXPLORATION
ARCO Alaska, Inc.
To: AOGCC
From: Zeljko Runje MB 12-1
Prudhoe Bay Drilling
Subject' Plug and Abandonment of Well DS 18-3 ( Revision #1 )
December 29, 1994
1. Move in drilling rig. Test 9-5/8" intermediate casing pack-off if not done during
pre-rig work.
.
Pull BPV. Bullhead @ 100 bbls SW down 3.5" tbg. ( Note: Tbg capacity is @ 75
bbls. Be aware of the pressures because there is a PXN plug stuck inside of
tubing @ 8259' MD. W/L was able to pump @ 3 BPM at 1800 psi at the start and
@ 800 psi at the end of the job.)
3. Install a BPV and test tree plug. ( After ensuring that the well is dead please
remove the production tree )
4. Install BOP's and test to 250/5000 psi. Remove the test plug and BPV.
5. Pull and lay down the 3-1/2" tubing. Records do not indicate that the seal
assembly was/was not sheared. PUW was 87,000# SOW was 77,000# )
6. P/U bridge plug. RIH and set it ~ 200' ( at 8480' ) below proposed 9-5/8 section.
P&A well by using down squeeze method. ( To be witnessed by AOGCC)
a.
Establish injection rate prior to pumping cement
Pump total of 16 bbls of P & A cement
Unsting out of bridge plug and POOH.
The objective of this P & A is:
a,
Squeeze away 5 bbls of cement slurry ( 5 bbls )
Cover up perfs and up to 120' MD above the perfs ( 7.5 bbls )
Will pupm 30% of excess ( 3.5 bbls )
Total of 16 bbls of slurry R EC E IV E D
JAN - 9 1995
Prepared by: ~f/~ /~ i
D rillin~g E nginee rco.~/~erators,
BP Exploration (Alaska), Inc.
Post Office Box 196612
Anchorage, Alaska 99519-6612
Telephone (907) 561-5111
Prudhoe Bay Unit
Alaska Oil & Gas Cons. Commission
Anchor~ ,~
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone (907) 276-1215
ARCO Alsek&,
Well .- 18-03
Spud Date: 7/30/82
Original RKBE: 46'
ToD of Formation: 9060'
Annular Fluid: Diesel/9.6 NaCl
Reference Log: BHCS
Inc. - Pzaldhoe Bay
API #: 50-029-20776-00
Completion: 10/27/87
Hanger Type: McEvoy Gert III
Max Hole Angle: 33° @ MD: 6400'
Date: 8/13/82 Tie In:
Type: PRODUCER
Status: Workover
Hanger: 29'
Angle g TS:22
Angle g TD: 19
Date: 00/00/00
ALL DEPTHS AItE IqKB DRILLING MD TO TOP OF E(}UIPM~NT EXCEPT WHERE NOTED.
Jewelz3f (,3)
J-1
J-2
b,C.1
J-9
G-1
1.1
J-3
J-4
Depth
1 37'
2 2208'
3 8516'
4 8536'
5 8640'
6 8650'
7 8651'
8636'
9 8259'
Description
Crossover 5-1/2" x 3-1/2"
3-1/2" Camco TRDP-1A SSSV Nipple ID:2.812"
3-1/2" BOT PBR Assembly
9-5/8" x 3-1/2" BDT 3-H Packer
3-1/2" Otis XN Nipple ID=2.75"
3-1/2" BOT Shearout Sub
3-1/2" Tubing Tail
ELM Tubing Tail {Logged 05/23/88)
FISH: 2.211" Otis Grapple & Pxn Plug
(Lost 12/16/92)
ID: 3-1/3' Otis ~ Nipple
RECEIVED
JAN - 9 1995
Alaska Oil & Gas Cons. Commission
Anchors:~
Casing and Tubing (C)
Size Weight Grade
1 13-3/8" 724 L-80
2 9-5/8" 474 5-80
3 7' 294 L-80
5-1/2" 174 L-80
3-1/2" 9.64 L-80
Top Bottom Descrimtion
O' 2600' Casing
O' 8918' Casing
8587' 9665' Liner
O' 37' Tubing-PC
37' 8651' Tubing-PC
J-5
J-6,7
C-2
~as hift Information (G)
MD T~D Sin Nan~rsl Valve Type Latch
8289' (7605') 1 OT-LBX TE 02-20R T-2
Sin 1: Double Check valve
Chemical Injection Info~mation (I)
MD TVD Sin Nandrel Valve Type Latch
8406' (7710') 2 CA-K~MG-LTS CA BK BK-2
8460' (7759') 3 CA-K~MG-LTS CA BK BK-2
Port TKO Date
1/2" ORIF 07/20/92
Port
TR0 DaCe
07/22/91
07/22/91
P-1
Perforation Data (ELI(DEP?RS)
Interval Zone FT SFF Date
1 9520- 9530 lB 10 0 06/16/92 SQZ
9540- 9549 lB 9 ~ 06/16/92 SQZ
9549- 9579 lB 30 6 07/03/92 RPERF
9579- 9580 lB 1 0 06/16/92 SQZ
Datum
8600' SS= 9422' MD PBTD=- 9622'
8700' SS= g528' MD TD= 9685'
Revision DaCe: 05131/93 by P?D
Reason: 4D CONVERSI(:A1
Previous ~e~son: 03/06/93
well 18-03
C-3
STATE OF ALASKA (.,J N J N A1
ALASKA-""-"", AND GAS CONSERVATION C¢'~";,IlSSION
REPORT vF SUNDRY WELL OPP_rlATIONS
1. Operations performed:
Operation shutdown Stimulate ~,, Plugging , Perforate X ,,
Pull tubing Alter casing Repair well
Other X~
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
1184' FNL, 161' FEL, Sec. 24, T11N, R14E, UM
At top of productive interval
1314' FSL, 991' FEL, Sec. 24, T11 N, R14E, UM
At effective depth
1129' FSL, 1065' FEL, Sec. 24, T11 N, R14E, UM
At total depth
1110' FSL, 1072' FEL, Sec. 24, T11 N, R14E, UM
X
RECEIVED
AU G - 7
Alaska 0il .& Gas Cons. C0mmi,~si0n
Anch0rag~
6. Datum of elevation(DF or KB)
46' RKB feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
18-3
9. Permit number/approval number
82-109
10. APl number
50 - 029-20776
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 9685 feet
true vertical 8894 feet
Effective depth: measured 9599 feet
true vertical 8813 feet
Casing Length Size
Conductor 80' 20"
Sudace 2554' 13-3/8"
Production 8872' 9-5/8"
Liner 1078' 7"
Plugs(measured)
Junk(measured)
Cemented
2940 # Poleset
2400 sx Fondu & 400 sx PFC
500 sx Class G & 300 sx PFC
340 sx Class G
Measured depth True ve~icaldepth
110' 110'
2600' 2600'
8918' 8178'
9665' 8875'
Perforation depth: measured 9549-9579'
true vertical 8766-8794'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 37' MD; 3-1/2", L-80, 9.6#, PCT tail @ 8651' MD
Packers and SSSV (type and measured depth) BOT 3-H pkr @ 8536' MD; 3-1/2" Camco TRDP-1A-SSA SSSV @ 2208' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See attached.
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
Prior to well operation 601 5201 0 --
Subsequent to operation 1644 6876 0 --
Tubing Pressure
1254
815
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations ,
16. Status of well classification as:
Oil X,, Gas , Suspended, ,
, Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed
Form 10-404 Rev 06/15/88
Title Sr. Area Operations Engineer
863/10 DCR/GSS/KRF cc: SW. JWP
Date ~)/'~//~ ~'""
SUBMIT IN DUPLICATE
18-3
DESCRIPTION OF WORK COMPLETED
CTU CEMENT SQUEEZES FOR GAS SHUTOFF & PACKER STIMULATION
7/30/91:
An Acid Wash & CTU Cement Squeeze were performed for Gas Shutoff as follows:
MIRU CTU & PT equipment to 4400 psi. Loaded wellbore with Seawater & RIH w/CT to reciprocate
an acid wash across the open perforations at:
9553 - 9580' MD (Z1B)
Ref. Log: BHCS 8/13/82.
Pumped 30 bbls 15% HCl w/10% Xylene, followed by 30 bbls 12% HCl - 3% HF, followed by 30
bbls 3% NH4Cl Flush.
Pumped 45 bbls of Acid Resistive cement, & placed 3.5 bbls of cement behind pipe at 3500 psi
maximum squeeze pressure, held for 45 minutes until the packer failed. Contaminated cement
w/biozan & jetted cement from wellbore down to 9602' MD. POOH w/CT. Rigged down.
9/30/91 .'
Ran a Pump In Temperature Survey indicating a resqueeze was required.
6/13192:
Performed a presqueeze fill cleanout down to 9593' MD.
6/16/92:
A CTU Cement Resqueeze was performed for Gas Shutoff as follows:
MIRU CTU & PT equipment. Loaded wellbore with 1% KCl Water w/Scale Inhibitor, & RIH w/CT to
resqueeze the squeezed perforations (listed above).
Pumped 23 bbls of Micro Matrix cement, and placed 11.6 bbls of cement behind pipe at 2400 psi
maximum squeeze pressure. Had continuous pressure breakbacks from 2400 psi to 2100 during the
squeeze. Held 2100 psi squeeze pressure for 15 minutes. Contaminated cement w/biozan & jetted
contaminated cement from wellbore. POOH.w/CT. Rigged down.
7~3~92:
Reperforated:
9549 - 9579' MD (Z1B)
Ref. Log: BHCS 8/13/82.
7110192:
A Selective Packer Stimulation was performed to initiate flow from the well as follows:
MIRU & PT equipment to 4000 psi. Fluid packed the wellbore w/2% NH4Cl water, & RIH w/CT
mounted 2.5" inflatable packer. Set packer at 9535' MD, to isolate the leaky squeezed perforations at
9520 - 9530' MD, from the stimulation fluids. Treated the perforation interval (listed above).
Pumped:
a) 40 bbls of 50/50 Diesel/Xylene @ 1 - 2 bpm, followed by
b) 40 bbls of 15% HCl @ 1 bpm, followed by
c) 21 bbls 6% HCI - 1.5% HF, followed by
d) 40 bbls of 2% NH4CI Water, followed by
e) 70 bbls of 50/50 Diesel/Xylene @ 1 - 2 bpm, followed by
f) 25 bbls of 2% NH4CI Water, followed by
g) Shutdown for soak.
RECEIVED
AUG - ?
Alaska Oil & Gas Cons. CommisSion
Anchorage
During the treatment, 2% NH4Cl Water was injected down the backside @ 1 bpm through the leaking
squeezed perfs, to assist in keeping the stimulation fluids in zone. POOH w/packer. Rigged down.
Returned well to production with nitrogen lift & obtained a valid production test.
ARCO .Al,,q]m, Inc.
P.O.Boz 100360
Anchorage, Aluka 99510
DATE: 9-18-92
REFERENCE: ARCO CASED HOLE FINALS
1-24 8-18-92
8-18-92
8-8-92
8-9-92
8-13-92
8-14-92
8-15-92
11-13 8-17-92
8-14-92
16-28 8-10-92
8-17-92
Prod Profile R.n 1, 5"
Prod Profile Run 1, 5"
Prod Profile (Flexstak) R.n 1, 5"
Prod Profile R-n 1, 5"
GR/CCL/Jewelry R.n 1, 5"
GR/CCL Rim 1, 5"
Prod Profile R-n 1, 5"
Le~k Detect Run 1, 5"
Temp Run 1, 5"
GR/Colll~ Rr~n 1, 5"
Prod Profile R-n 1, 5"
Cttlnco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Please sign and retum_~atta~/~ co~ as receipt of data.
RECEIVED
Have A Nice Da~ t',~ ~- -- ~" -
Sonya Wallace
APPROVED __
AT0-1529
# CENTRAL FILES
# CHEVRON
D&M
# EXTENSION EXPLORATION
# EXXON
MARATHON
# MOBIL
# PHILI3PS
PB WELL ~
R&D
# BPX
# STATE OF ALASKA
TEXACO
ARCO ,Al--,,ka, Inc.
P. 0 .Box 100360
Anchorage, Alaska 99510
DATE: 9-18-92
REFERENCE: ARCO CASED HOLE FINALS
--Zl 6 4-92
~ 5-8-92
6-12-92
14-16 7-2-~2
,,/7.-'~ 6-9-92
6-9-92
4-18-92
~Z~~o? 18-3 7-3-92
Pert' Record Run 1j, 5"
Peri' Record R-- 1, 5"
Peri Record R-n 1, 5"
Peri Record R11n 1, 5"
Peri Record Rim 1, 5"
Peri Record R-n 1, 5"
Peri' Record R-n 1.5"
Peri Record R.n 1, 5"
Peri Record R-- 1.5"
Ple. e sign and return~ at~//~l co~of data.
a,., a.i. ~.~/ R~ C E IV E D
Sonya Wallace 0CT 0 5 i992 API'ROVED__~~__
ATO-1529 Trans# 92208~ - -
Alaska 0il & Gas Cons. Commission
Anchorag~
# CENTRAL ~
# CHEVRON
D&M
# EXTRN610N EXPLORATION
# EXXON
MARATHON
# MOBIL
# PHILLIP~
PB WELL FILES
R&D
# BPX
# STATE OF ALASKA
TEXACO
ANCHOF(AGE, ALASKA
9~'0
DATE' t t-8-9t
REFERENCE: ARCO CASED HOLE FINALS
PROD PROF'ILE
LEAK DETECT
GR/CCL
L.I.ZAK DE'f'FC'F
F'ROD PROFILE
PITS
BRIDGE PL. UG TIE-IN
PROD PROI"-' l I_E
PROD F'ROFILE
PROD PROFILE
PROD F'ROFILE
LEAK DE'FECT
F' ]:TS
Pl..EASE SIGN AND RE/TLJRN TH~4 ATTACHED COPY
HAVE ANI
SONYA WALL. ACE
ATO-t 529
RUN i,
RUN t,
RUN t ,
RUN i,
RUN i ,
RUN t,
RUN t,
RUN t,
RUN i,
RUN t,
RUN i ,
RUN i ,
RUN t,
AS RECEIPT OF DA'FA
'I'RAN; 9
·
i "&5"
....,,
2'
5'
5"
5'
5'
5'
5'
S"
5'
5'
CAMCO
CAbiCO
CAMCO
CAMCO
CAMCO
CAiiCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
·
DISTRIBUTION.
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
F'HII..LIF'S
F'B WELL FILES
R & D
~ BF'X
'"' S'¥AI'E OF ALASKA
.I'EXACO
NOV 1 2 199t
,qla~ka 0ii ?, C-.~s 0OhS" · ·
ARCO ALASKA, INC,
P.O, BOX t00360
ANCHORAGE, ALA~'K A 995'~r%~
"DATE: 9-6-9t
REFERENCE' ARCO CASED HOLE FINALS
t-9- 8-t ?-9t PROD F'ROFILE RUN
2-5- 8-8.-9 t TEMPERATURE RUN
2-26- 8-8-91 PROD PROFILE RUN
~(] ~$-35- 8-3-9 ~ GR-COLLAR RUN
4-2~ 8-J e-gJ F'I 1'~ RUN
, --5- 32- 8-~ e-9~ JEWELRY RUN
~ 7-7A- 8-9-9~ PROD PROFILE RUN
7-~ ~ 8-4-9~ TEMPERATURE RUN
7-2~ 8-'~8-9~ PROD F'ROFILE RUN
7-28' 8- ~ -9 ~ TEMPERATURE RUN
7-2~ 8-3-9~ F'ERF BREAKDOWN/HPFM/TEMP RUN
9-6- 8-2-9~ LEAK DETECT RUN
9-.~ 8-~ 9-9~ F'IT~ RUN
9-~7~ 8-4-9~ INd PROFILE RUN
~-2~ 8-9-9~ INd PROFILE RUN
~-~ 8-4-9~ LEAK DETECT RUN
~ ~-24- 8-4-9~ PIT~/HPFH RUN
~2-3~ 8-~4-9~ LEAK DETECT RUN
~2-8B- 8-9-9~ F'ROD PROFILE RUN
* ~3-3- 8-~-9~ F'ROD PROFILE RUN
~3-~- 8-~-9~ PROD PROFILE RUN
~3-~2- 8-~5-9~ PROD PROFILE RUN
~3-~4- 8--~6-9~ PROD F'ROFILE RUN
~4-23- 8-~-9~ PROD PROFILE RUN
~5-2~ 8-~4-9~ PERF BREAKDOWN TREATMENT RUN
~6-~- 8-~6-9~ INd F'ROFILE RUN
~8-3-- 8-~6-9~ LEAK DETECT RUN
!
5'
5"
5"
5"
5'
5'
5'
5'
5"
t'&5'
5"
5"
5"
5"
5"
5"
5"
5"
5"
2'&5'
5'
5'
5'
5'
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAHCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
PLEASE YI6N AND RETURN THE ATTACHED COPY AS RECEIF'¥ OF DATA
HAVE A NICE DAY!
~'ONYA WALLACE
ATO- t 529
'I'RAN,S'-t. 9t T65"
DISTRIBUTION
~ CENTRAL FILES :~ PHILLIPS'
,.~ CHEVRON PB WELL_ FILES
D & M R & D
~ EXTENSION EXPLORATION ~ ~ BPX
-~ EXXON $ STATE OF ALASKA
MARATHON TEXACO
~ MOBIL
* THE CORRECTED AF'I$ FOR t S-~ IS 50-(D29-.20325,
ARCO ALASKA, INC.
F'.O. BOX iG~360
ANCHORAGE ALASKA
995 t 0
DATE' 3-9-90
REFERENCE' ARCO PRESSURE DATA
3-4 t -6-90
3-J 8 t -6-90
9-J 5 t-~ 5-90
9-~ 9 ~ --~
t t - t 1 -5-90
i t '-i 6 t -5-90
i 2-23 i -7-90
i 2-29 i -i 3-90
13-32 t-7-90
t4-2t t-3-90
i4-36
i 6-i i i -i 3-90
i 8-3 i i -29-89
i 8-9 t t-29-89
t 8-t 6 t t-29-89
i 8-20 i t-29-89
BHF'--STATIC GRADIENT
BHF'--STATIC GRADIENT
BHF'--$TATIC GRADIENT
BHF'--$TATIC GRADIENT
BHF'--$TATIC
BHP--$I'AI'IC
BHP--$TATIC
BHF'--$TATIC GRADIENT
BHP--STATIC
BHP--F'LOWING GRADIENT
BHF'--FLOWING GRADIENT
BHP--STATIC GRADIENT
BHP--$TATIC GRADIENT
BHP--STATIC GRADIENT
BHP--$TATIC GRADIENT
BHP--$TATIC GRADIENT
CAMCO
CAMCO
CAMCO
CAMCO
HRS
HRS
HRS
CAMCO
HRS
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
PLEASE SIGN
RECEIVED BY
AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA.
R£-C-Ei-V-E D
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-i529
MAR 1 4 !990
Alaska Oil & Gas Cons. Goings,'toil
Anchorag~
AF'F'ROVED ~___
I'RANS~ 9(DA,f O5
DISTRIBUTION
CENTRAL FILES -,,-'" ~'HILLIP$
CHEVRON PB WELL F'ILE$
· " D & M -,,-"' R & D
EXTENSION EXPLORATION ~ BPX
~ STAI'E OF ALASKA
~ EXXON ~ ~
MARATHON ~ TEXACO
.~ MOBIL
ARCO AI_A.~I<A, .INC,
F'.O. BOX t86'360
ANCI4OR~:4(.iE, ALASKA 995i (')
..
DATE' 6-2-89
RF_FERE:NCE' ARCO MAGNETIC TAPE(J;) WITH LI~*TING(5;)
4-t'2 5-t 4-89 CNI_/F'IT::¢, RtJN ~ ,JOB:~'73335
.~-2~ 5-i .3-89 CNI_, RUN 3 ,JOB~73332
~;8-3 5-i 5-89 CNL/F'I'F;; R'tJN i JU~.~7,5.5
F't_EASE ~'IGN AND RETURN TI-lIE ATTACHIED COF'Y AS' RECEIPT OF DATA.
;~' C 1-.t
~.' C H
$CH
HAVE A NICE
~'ALLY HOFF'EC APF'ROVED
ATO- ~ 529" Al~tsl4a Oil & Gas Oons. 6ommissiorl 'I'RAN~,',~
Anchorage
DI~'TRIBUTION
CENTRAL FILES (CH) ~ PHILLIP,S'
CHEVRON F'B WELL FILE,S'
D & M R & D
TAMMA$ BROWN (OH) ~-~ BPX
EXXON ~ STAI'E OF ALASKA
MARATHON TEXACO
MOBIl_
ARC(] ALA~'KA, INC.
F'.O. BrJX i0(~360
ANCHORAGE, ALASKA
DATE' 5-i 9-89
REFERENCE' ARCO CASED HOLE FINALS
t-2i 5-i6-89 CNL-GAMMA RUN t, 5'
t4-3 5-f4-89 CNL-GAMMA RUN t, 5"
i4-3 5-14-89 DIFF. TEMP RUN
~4-t2 5-t4-89 CNL/F'I'F$ RUN
i8-S 5-i5-89 CNL-GR/F'IT$ RUN
NGI-3 5-t6-89 COLLAR/F'ERF RUN i, 5'
PI_EASE SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF' DATA.
ATLAS
Al'LAS
ATLAS.'
S C H
£' C H
ATLAS
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-~529
APPROVED ~___
'I'RAN$$ 8~22~
DISTRIBUTION
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
PHILLIPS'
PB WELL FILES
R & D
BPX
STATE OF ALASKA
TEXACO
Anchorage
ARCO ALASKA, INC.
F',O, BOX i00360 ~
ANCIHORAGE, ALASKA 995i0
DATE' 5-9-89
REFERENCE' ARCO CASED HOLE FINAL£
f -8 4- t 6-89
t -24 4-8-89
2-t ~ 4-23-89
2--i 4 4-i 5-89
2.-t ? 2-t 7-89
">-'> 3 4-t 3-89
4-7 4- t 6-89
4-25 4-18-89
9-t 4-t 3-8~
I ~-~ 4--24-8~
~ ~-~ 6 4-i 2-89
~ 2-?A 4..-~ ~-89.
~ ~8 4-2~-8~
~ 2-2~ 4-2~-8~
~ ~-8 4-22-8~
~ ~-2~A 4-2~-8~
~ 4-2 4-~ ~-8~
~4-~8 4-~-8~
~ 6.-~ ~ 4-24-89
~ 7-8 4-~ ?-8~
~8-~ 4-2~-8~
~ 8-7 4-2~-8~
INJECTION F'ROFILE RUN
PRODUCTION PROFILE RUN t, 5'
TEMF' , RUN t , ~'&5'
F'RODUCI' ION PROFILE RUN
SPINNER/TEMF'/FLUID DENS/GR RUN
F'RODUCTION F'ROFILE RUN
PRODUCTION PROFILE RUN t , 5'
SF'INNER/TEMF' RUN i, 5"
LEAK DETECTION RUN i, 2'&s'
PRODUCTION PROFILE RUN
LEAK DETECTION RUN i,
LEAK DEFECTION RUN i, 5'
PRODUCTION F'ROFILE RUN i,
PRODUCTION LOGGING SVCS. RUN t, 5'
GAS LIFT SURVEY RUN i, 2'
TEMP RUN
LEAK DETECTION RUN i,
PRODUCTION PROFILE RUN 1, 5'
MI INJECTION F'ROFILE RUN t, 5'
PRODUCTION PROFILE RUN i.,
PI TS RUN
LEAK DETECTION RUN
INJECTION F'ROFILE/TEMF' MUN i
MULTI-RATE INJECTION PROFILE RUN
F'RODUCTION LOGGING SVCS. RUN t, 5'
F'RODUCTION LOGGING SVCS. RUN t, 5''
PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA
RECEIVED BY _~_-?~_~ ].~ ~j 0
HAVE A NICE DAY~''~ ~'~~~ '~ ~
ATO-i 529 ... &x TRAN~'~ 89f97
. ~ ~-~.' ·
D~I~$~R I BUI' I ON
CENTRAL FILES ~ PHILLIPS
CHEVRON ~ MOBIL
EXTENSION EXPLORATION ~ BPX
EXXON ~
~ STATE OF
MARATHON ~ TEXACO
ALASKA
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
· :% .... ~ ..
[, ~ t'~l_: 0
(]'¥ I S
C A M C 0
CAMCO
CAMCO
CAMUO
CAMCO
ATI_A$
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMUO
AI'I_A~'
* THE CORRECT AF'I~ FOR 2-t2 IS 5¢J-829-'29277.
** THE CORRECT AF'I~ FOR
ARCO Alaska, Inc. ,,,.,,
Prudhoe Bay Engineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
December 2, 1988
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 18-3 Approval No. 8-534
Dear Mr. Chatterton:
Attached is the Report of Sundry Well Operations detailing work per-
formed on the above-referenced well.
Very truly yours,
D. F. Scheve
DFS/DMF/jp
Attachment
cc: Standard Alaska Production Company
J. Gruber, AT0-1478
Pi(DS 18-3)W1-3
RECEIVED
Oil & Gas Cons. C0_m~.issi0r~
WELLS3/60
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
AR3B--6132-C
STATE OF ALASKA
OIL AND GAS CONSERVATION COMb ;ON
REPORI OF SUNDRY WELL OPERATIONS
'~1, operationsPedormed: Operation shutdown .._. Stimulate.__' Plugging~ Perforate ~
Pull tubing .__ Alter casing ~ Repair well _._ Pull tubing
~. Name of Operator ' ' / 5. Type of Well:
_A~CO Alask. a, Inc, j Development ¢/
, Exploratory __
31 Addre~s I Stratigraphic __
?. O. Box 100360, Anchorage, AK 99510 I Service__
4. Location Of well at surface'
1184' FNL, 161' FEL, Sec. '24, TT1N, R14E, UM
At top of productive interval
1314' FSL, 991' FEL, Sec. 24, TllN, R14E, UM
At effective depth
1129; FSL, 1065' FEL, Sec. 24, TllN, R14E, UM
At total depth
1110' FSL, 1072' FEL, Sec. 24, TllN, R14E, UM
i'2. P~es'ent well condition summary
Total depth: measured 9685 feet Plugs (measured)
true vertical 8894 feet
Other
6. Da/~u0m~ elevati0n't~(B (DF'or KB)
feet
7, Unit or P.r. oc)ertv name.
'Prud~Se 3~y ~Jnit
8, Well number
18-3
9. Permit number/approval number
8-534
10. APl number
50-- 029-20776
'
~11. Field/Pool
Prudhoe Bay Oil Pool
Effective depth: measured 9622 feet Junk (measured)
true vertical 8835 feet
Casing ~ngth Size
Surface 80' 20"
Intermediate 2554' 13-3/8"
Production 8872' 9-5/8"
Liner 1078' 7"
Cemen~d Measumdde~h
2940# ?oleset 110'
2400 sx Fondu & 2600'
400 sx PFC
500 sx Class G & 8918'
300 sx PFC
340 sx Class G 9665'
.~ueverticaldepth
il0'
2600'
8178'
8875'
Perforation depth: measured
9553-9580'
true vertical
8770-8795
Tubing (size, grade, and measured depth)
3~", L-80, 9.6#, tbg w/tail @ 8651' MD
Packers and SSSV (type and measured depth)
B0T 3-H pkr @ 8536' & TRDP-1A-SSA
13. Stimulation or cement squeeze summary
14.
Intervals treated (measured)
SSSV @ 2208' MD
Attached
Treatment description including volumes used and final pressure
REEE iV£D
DEC o 7 198i
~,.;o~,~,, 0il & Gas Cons. C0mmissl¢
, . ~ ~nch0rage
Prior to well operation
Representative Daily Average Production or Injection Data
OiI-Bbt Gas-Md Water-Bbl Casing Pressure
2201 17147 0 --
1275. 5266 0 --
16. Status of well classification as:
Oil v/ Gas_ Suspended __
Service
Engineering Manager
~bingPressure
1682
Date
Subsequent to operation
'15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations ~
17.' I hereby certify' that the foregoing is true and correct to the best of my knowledge.
1058
SUBMIT IN DUPLICATE
Signed .,¢~¢¢¢¢ ~)/~~~''''
Form 10-404 Rev06/15/88 WELLS3/60 9,
T~le Operations
M. Fife, 263-4278
8/13/88
8/15/88
8/17/88
9/1/88
DS 18-3
DESCRIPTION OF WORK COMPLETED
CTU CEMENT SQUEEZE FOR GAS SHUT-OFF
Performed mud acid wash as follows:
MIRU CT. PT equipment to 4000 psi.
RIH w/CT and washed perforations from:
9520-9580' MD Ref. Log: BHCS 8/13/82
Pumped treatment as follows:
1. 110 bbls crude
2. 48 bbls 12% HCI/xylene
3. 48 bbls 12%-3% HCI-HF
4. 47 bbls 12% HCI
5. 5 bbls diesel spacer
Displaced CT w/gelled water.
Tag run to 9590- PBTD, (SLM).
Performed CTU cement squeeze as follows:
MIRU CT. PT equipment to 4000 psi.
RIH w/CT fluid packed wellbore w/270 bbls seawater.
Pumped 2 bbls FW followed by 25 bbls cement, squeezing perfs:
9520-9530' MD Ref. Log: BHCS 8/13/82
9540-9580' MD
Held 1600 psig squeeze pressure 1 hour.
Contaminated cement w/70 bbls contaminant. Performed same day cleanout.
Reperforated:
9553-9580' MD Ref. Log: BHCS 8/13/82
Rigged down. Opened well, flowed to tank and attained new capacity.
DMF/00412
ARCO ALASKA, INC.
P.O. BOX tGGJ&G
ANCHORAGE, ALASKA
DATE: 9-9-88
REFERENCE: ARCO CASED HOLE FINAL
2-i 4 8-3~-88
2-t 6 8-3~-88
~3-5 8-22-88
~ 3- ~ 2 8-29-88
~3-25 8-2?-88
4- t 8-3 t -88
4 9 8-t 9--88
4- t ~ 8-22-88
-~5-t 2 8-4-88
5- t 3 8-4-88
~'-&-i 2 8-i 7-88
~'- ?-8 8-t 7-88
?-i 5 8-i 7-88
-~"7-33 9-7-88
9-t3 8-i 8-88
t t-t 5 9-2-88
t 3-t8 8-2t -88
t 4-3 8-26-88
"~t D-i 8-3i-88
~t 5-2 t 8-29-88
'~"t 8-3 9-i-88
18-t7 9-1-8~
COMPLETION RECORD--GAMMA RAY RUN i, 5"
PRODUCTION PROFILE RUN i,
PRODUCTION PROFILE RUN 1, 5"
LEAK DETECTION TEMP RUN t, 2'
FLOWMETER--GAMMA RAY RUN t,
PITS RUN i, 5"
INJECTION PROFILE TEMF' SURVEY RUN
INJECTION PROFILE RUN i,
CONTINUOU£ FI. OW SURVEY RUN i,
CONTINUOUS FLOW S~JRVEY RUN t, 5"
PITS RUN i, 5'
PRODUCTION PROFILE RUN t, 5'
PRODUCTION F'ROFILE RUN i, 5"
COLLAR RUN t, 5'
COLLAR RUN t, 5"
PFC RUN t, 5"
INJECTION PROFILE TEMP SURVEY RUN i, 5"
LEAK DETECTION RUN t, t'&5'
PRODUCTION F'ROFILE RUN t, 5'
CCL--GAMMA RAY RUN t, 5'
COLLAR/F'ERF RUN i, 5'
P~RFORA'¥iNG RECORD 'RUN
'PLEASE SIGN AND RETURN THE ATTACHED COPY AS F~:ECEIF'T OF' DATA.
SCH
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
GEAR
GEAR
CAMCO
CAMCO
CAMCO
ATLAS
CAMCO'
ATLAS
CAMCO
CAMCO
CAMCO
CAMCO
ATLAS
$CH
RECEIVED BY
HAVE A NICE DAY!
£ALLY HOFFECKER
ATO-i529
TRAN$ ~88568 ~
APPROVED .
DISTRIBUTION
~ CENTRAL FILES
'"' CHEVRON
D& M
.~ EXTENSION EXPLORATION
~~ EXXON
MARATHON
~'~ MOBIL
11'
PHILLIPS
PB WELL FILES
R & D
SAF'C
STATE OF ALASKA
TEXACO
Fi A H Fi f'l
f.'i t:~ H f": Fi
[; ,.'.~ H f': ,"'!
lC F' t-"', I:;.'
[: ~':':~ H Fi f'l
[.'. ~'~:, Fi f".' F1
Fl A Fi f'i f'l
f': A ,t.q f--.- Fi
Fi ;.q i'd f".' Fl
ARCO/' lask~', Inc.
l~rudhoe Bay Engineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F, Scheve
Operations Engineering Manager
July 6, 1988
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 18-3 Permit No. 82-109
Dear Mr. Chatterton:
Attached is the Application for Sundry Approval detailing work to be
performed on the above-referenced well.
Very truly yours,
D. F. Scheve
DFS/DMF/jp
Attachment
cc: Standard Alaska Production Company
J. Gruber, AT0-1478
Pi(DS 18-3)W1-3
WELLS2/170
ARCO Alaska, Inc. is a Subsidiary o! AtlanticRi~chlieldCompany
AR3B--6132-C
~. STATE OF ALASKA
' ALASK, . ,.)IL AND GAS CONSERVATION COM~,.,,SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other
2. Name of Operator
ARCO Alaska~ Inc.
3. Address
P. O.. Box 100360, Anchorage, AK 99510
4, Location of well at surface
1184' FNL, 161' FEL, Sec. 24, TllN, R14E, UM
At top of productive interval
1314' FSL, 991' FEL, Sec. 24, TllN, R14E, UM
At effective depth
1129' FSL, 1065' FEL, Sec. 24, TllN, R14E, UM
At total depth
lll0' FSL, 1072' FEL, Sec. 24, TllN, R14E, UM
5. Datum elevation (DF or KB)
46 ' t~B feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
DS 18-3
8. Permit number
82-109
9. APl number
50-- 029-20776
10. Pool
Prudhoe Bay Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
9685 feet
8894 feet
Plugs (measured)
Effective depth:
measured
true vertical
Length
80'
2554'
8872'
Casing
Conductor
Surface
Production
9622
8835
Size
20"
13-3/8"
9-5/8"
7"
feet
'feet
Liner 1078'
Perforation depth: measured
9520-9530'; 9540-9580'
true vertical
8739-8748'; 8757-8795'
Tubing (size, grade and measured depth)
3½", L-80, tbg W/tail @ 8651' MD
Packers and SSSV (type and measured depth)
BOT 3-H pkr @ 8536' & TRDP-1A-SSA SSSV @ 2208' MD
Junk (measured)
Cemented Measured depth
2940# Poleset 110'
2400 sx Fondu & 2600'
400 sx PFC
500 sx Class G & 8918'
300 sx PFC
340 sx Class G 9665'
~ueVerticaldepth
110'
2600'
8178'
8875'
12.Attachments
Description summary of proposal EA Detailed operations program [] BOP sketch
13. Estimated date for commencing operation
June 1988
14. If proposal was verbally'approved
Name of approver
approved
15. , hereby/) certify thAt, c//././/~the_,oreg.oing is true and correct to the best of my knowledge
Signed ~.~~~1 ~,~,- ~ Title Operations Engineering Manager Date
Commission Use Only
Conditions of approval Notify commission so representative may witness ] Approval No.
[] Plug integrity ~ BOP Test [] Location clearance
I
Approved by
,,,,.L~IHAL SIGNED
~Y LONNIE C. SMITH
&pproved Copy
Returne~,,..
Commissioner
Form 10-403 Rev 12-1-85 WELLS2/170 D. M. Fife, 263-4278
by order of
the commission Date /? '"/,:~~
Submit in triplicate
DS 18-3 CTU Cement Squeeze
Project AFE# 797961
Procedure
1. Make a slickline tag run to verify the PBTD. Last PBTD was 9590' MD (ELM) on 5-23-88.
2. If necessary, do a fill cleanout to 9622' MD.
3. Replace chemical injection valve with a dummy valve.
4. RIH with coiled tubing and fluid pack the wellbore with filtered seawater.
5. Pump 25 bbls of cement followed by 2 bbls of water and 50 bbls of contaminant. Hold 1500
psi surface squeeze pressure for 60 minutes. Squeeze off the following perforations:
Zone Perforations SPF
lB 9520-9530 4
lB 9540-9580 4
Zone
lB
8. Test the well.
6. Jet or reverse out the contaminated cement.
7. Perforate as follows:
Perforations
9540-9580
(Ref.: BHCS 8-13-82)
SPF (Ref.' BHCS 8-13-82)
FSD Reperf
9. If the well will not flow, add the contingent perforations as follows:
Zone Perforation~ SPF (Ref.: BHCS 8-13-82)
lB 9520-9530 FSD Reperf
Other Well Information;
Current status: On production.
Expected static bottomhole pressure: 3700 psi. @ 8800' SS
Expected fluid in wellbore at reperforation: seawater.
.5
4
2
C01, LED 1LIBINI3 UNIT
BOP EGU ] Pi~NT
1. 5000 PSI ?" WELLHEAD CONNECTOR F'LAPiG£
2. 5000 PSI 4 1/16" PiPE RAMS
3. ~d)O0 PSI 4 1/6" HYDRAULIC SLIPS
4. 5000 PSI 4 1/6" SHEAR RAMS
5. 5000 PSI 4 1/6" BLIND RAMS
6. 5000 PSI 4 1/16" STUFFING BOX
HIRELINE BOP EOUIPMENT
1. 5000 PSI ?" WELLHE.A~ CONNECIOR FLANGE
2. 5000 PSI WIRELIN£ RAtaS (VARIABLE SIZE)
.3.5000 PSI 4 1/6" LUBRICATOR
4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF
ANCHORAGE~ AI._AgKA
DATE:
RFFERFNC.F..: ARCO EA~ED HOI...E FINAl...
PWDW2-t 4~-6-R7
4-2g t ?-20-R?
5-'10 '~ -6-8F~
9-'2 i t3-R-R7
9-5 ~ ~-~ 3-87
9-~ f t-8-87
9-t 5 9-2R-R7
3-28 '~ -S-88
4-26 t -'7-88
4-35 ~ t-5-87
5-~ t t.0-24-87
i?-'~ i -2-88
8-9 t 2-26-87
CFII...I...AR/PFRFORAT T FIN
C. 131 [. AR/PERFFIRATT. FIN
COI..I...AR/PERFORAT I ON
CA,'~ I NE, ~11TTF'R'
COI...L. AR
COL. k. AR'
COI_I...AR
COt. I.. AR/PF..RFFIK'AT .T ON
C .ri. I...I...AR/PER'FOR. AT .'[ ON
C. 1'3 [. [..AR/PERFORATION
COI._I..AF,'
COL..I.AR
COLl..AR / F'E.. R.F OF.'. A T .T ON
COl.. [..AR
.P.,I.3 I...i,. A R/P .ERF OR. AT .T. ON
ATTACHFD CO~'Y ~
RECEIPT
RI.IN '1 ..5"
RIIN 'i: .5"
RIIN t , =; ·
RI.IN t . .=;"
RI. IN t..'5 ·
RI.IN 'l., 5'
RIIN i: 5 ·
RUN i, 5 ·
RIIN i ~ =; ·
RIJN '~., 5 ·
F,,'LINi, 5 ·
R.I. JNi., .5: ·
RIIN i, .~"
RLIN i., 5 ·
OF DATA.,
ATI.A~
ATIA~
ATI..A~
ATI A~
ATI..A%
ATi. A~
ATI..A~
ATIA~
ATI...A~
ATI...AE
ATI_AE
ATI.~
ATI..A~
ATI...Ag
ATI_.A~
RECEIVED BY
HAVE A NICE DAY'
PEGGY BENNETT
ATO-t52~
DIXTRI~IJTTON~
' Oil & Gas C,,ons,
~ CENTRAl... F .T t,..E.,.~ $ PH T. I...I.. I. P,.~
~. CHEVRON F'R WEI...I..
D & M r-,.,. & D
~ EXTEN,~ION F. XF'I... ORAT.T. ON
_. ~,~-$~ ..... _..,..~..., . .
.,,-'"' EXXON '~'~': ,~TATE-. OF. "Ai..-~,S'KA .
MARATHON ~ ~ TEXACO
,~-~ MOBIl._
/~'~-" STATE OF ALASKA
ALASKA uI.L AND GAS CONSERVATION L;L~MMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
. , ,
1. Status of Well Classification of Service Well
OIL IX GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Al aska, I nc. 82-109
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-20776
4. Location of well at surface 9. Unit or Lease Name
1184' FNL, 161' FEL, 5ec.24, TllN, R14E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1314' FSL, 991' FEL, Sec.24, TllN, R14E, UM 18-3
At Total Depth 11. Field and Pool
1110' FSL, 1072' FEL, Sec.24, TllN, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i I Pool RKB 46' ADL 28307
12. Date Spudded07/30/82 13. Date T.D. Reached08/12/82 i4' Date'C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns08/19/82* N/A feet MSL 1
17. Total Depth (MD+TVD) 18.Piug Back Depth (MD+TVD) 1'9. Directi'o'nal Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
9685'MD, 8894'TVD 9622'MD, 8835'TVD YES [~ NO [] [ 2209' feet MD 1900' (approx)
22. Type Electric or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/Cal, CNL/GR, CBL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
Zg" 91.5# H-40 Surf 110' 30" 2940# Pol eset
13-3/8" 72.0# L-80 Surf 2600' 17-1/2" 2400 sx Fondu & 400 sx PFC
9-5/8" 47.0# L~80 & Surf 8918' 12-1/4" 500 sx Class G & 300 sx PFC
5oo-95
7" 29.0# L-80 8587' 9665' 8-1/2" 340 sx Class G
24. Perforations open to Productior~ (MD+TvD of Top a~d Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Perforated w/4 spf, 90° phasing 3-1/2" 8651' 8536'
9520'-9530'MD 8739' -8748 'TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9540 '-9580'MD 8758 '-8795 'TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing,. gas lift, etc.)
Date of Test Hours Tested' 'PRODUCTION FOR. OH_-BBL GAS-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD I~
I
Flow Tubing Casing 'Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Brief description of l ithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
*Note: Perforated well 12/17/82. Workovers performed 9/16/8b¢~-& 10/28/87.
........
Form 10-407 WC4/24: DAN I Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
GEOLOGIC MARKERS ' FORMATION TESTS °
: ,
·
NAME ~' Include interval tested, pressure data, all fluids recovered and gravity,
.MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
·
Top Sadl erochi t 9060' 8309 ' N/A
G0C 9404 ' 8630 '
Base Sadl erochi t 9579 ' 8794 '
·
. .
,
31. LIST OF ATTACHMENTS
None
32. I hereby certify that the foregoing is true and correct to the best of my 'knowledge
Signed (~ ~j~ / .~/],~_~ TitleAssOci ate Engi neet Date..
//-
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
STATE Of ALASKA
OIL AND GAS CONSERVATION CO .... ,$SlON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing []
Alter Casing [] Other l~ ' W0RK0VER
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.0. Box 100360 Anchorage, AK
99510-0360
.
.
4. Location of well at surface 7.
1184' FNL, 161' FEL, 5ec.24, T11N, R14E, UN
At top of productive interval
1314' FSL, 991' FEL, Sec.24, T11N, R14E, UN
At effective depth
1i29' FSL, 1065' FEL, Sec.24, T11N, RI4E, UN
Datum elevation (DF or KB)
RKB ~r§' Feet
Unit or Property name
Prudhoe Ba;), Unit,
Well number
18-3
8. Approval number
7-~0
9. APl number
50-- 029-~n77~
At total depth
1110' FSL, 1072' FEL, Sec.24~ TllN~ R14E~ UM
11. Present well condition summary
Total depth: measured 9685 'MD feet
true vertical 8894 'TVD feet
Effective depth: measured 9622 'MD feet
true vertical 8835 'TVD feet
10. Pool
Prudhoe Bay Oil Pool
Plugs (measured) None
Junk(measured) None
Casing Length Size
Conductor 80 ' 20"
Surface 2570 ' 13-3/8"
Production 8890' 9-5/8"
Li her 1078 ' 7"
Cemented Measured depth
2940# Pol eset 1lO'MD
2400 sx Fondu & 2600'MD
400 sx PFC
500 sx Class G & 8918'MD
300 sx PFC
340 sx C1 ass G 8587'-9665'MD
True Vertical depth
110 'TVD
2600 'TVD
8178 ' TVD
7874 ' -8875 'TVD
Perforation depth: measured 9520'-9530 'MD' 9540'-9580'MD
true vertical 8739'-8748'TVD, 8758'-8795'TVD
12.
Tubing (size, grade and measured depth)
3-1/2", L-80, tbg w/tail @ 8651'
Packers and SSSV (type and measured depth)
3-H pkr @ 8536' & TRDP-1A-SSA SSSV ~ 2209'
Stimulation or cement squeeze summary
N/A
Intervals treated (measured)
Treatment description including volumes used and final pressure
RECElYEI)
Alaska Oil & Gas Cons. Commission
Anchorage
13.
N/A
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
14. Attachments (Workover Well History)
Daily Report of Well Operations ~_1
Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Form 10-404 Rev. 12-1-85
Title Associate Engineer
Date 11-1~..~7
(Dani) SW03/10
Submit in Duplicate
A CO Oil and Gas Company
Instructio ,s: P ~p~ re ; Id subn'
"Final Rc ~o rt" sh~u1:1 :)e subn
required p,~n :onlpl )t 3n, rep(:
operation if space is available.
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire
Accounting
State
cost center code
Alaska
District ICounty or Parish
Alaska I North Slope Borough
Field ILease or Unit
Prudhoe Bay AD[, #28307
Auth. or W.O. no. Title
I
AS 1762 Recompletion
~4S #1 API 50-029-20776
Well no.
18-3 W/O
Operator I A.R.Co. W.I.
ARCO Alaska, Inc. 21.66%
Spudded or W.O. begun I Date
. Workover 10/25/87
Date and depth Complete record for each day reported
as of 8:00 a.m.
10/24/87
thru
10/26/87
Iotal number of wells (active or inactive) on thts,
est center prior to plugging and
I
bandonment of this well
our I Prlor status If a W.O.
1800 Hrs.
I
7" @ 8587'-9665'
9622' PB~D, RIH w/std'g vlv on S/L
8.5 ppg sea wtr
Circ hole @ 8485'-8483'. Displ well w/sea wtr. PJ) S/L.
Accept rig @ 1800 hfs, 10/25/87. RIH w/std'g vlv.
10/27/87
[0/28/87
10/29/87
7" @ 8587'-9665'
9622' PBTD, RU injection in
8.5 ppg sea wtr
Set std'g vlv. Tst csg & pkr to 2000 psi, POOH w/std'g vlv.
.ND tree, NU & tst BOPE. POOH, LD tbg. Chg out 9-5/8" packoff
& tst to 3500 psi. RU to rn Camco 1/2" injection ln.
7" @ 8587'-9665'
9622' PB~D, RR
8.5 ppg sea wtr w/inhibitor
Tst tree. Tst ann to 2000 psi.
@ 1100 hfs, 10/28/87.
7" @ 8587'-9665'
9622' PBTD, NU tree
8.5 ppg sea wtr
Rn 272 its, 3½", 9.3#, L-80 EUE 8RD AB-Mod tbs w/2209', 3H Pkr
@ 8536', TT @ 8651'. Tst ann to 2000 psi; OK. ND BOPE,
tree.
NO~ ~ 7 19~7
as Co~s.
Displ w/diesel.
Old TD New TD
Released rig Date
1100 Hrs.
Classifications (oil, gas, etc.)
Oil
PB Depth
IKInd of rig
10/28/87
I
Type completion (single, dual, etc.)
Single
Producing method Official reservoir name(s)
Flowing Sadlerochit
Potential test data
9622'
Rotary
Well no. Date Reservoir Producing Interval Oil or gas · Test time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
The above is correct
11 / 12/87 Drilling Supervisor
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87. ~
. STAT20'F ALAS[O~
t~LA$i~\ OIL & CAS CONSERVIJION ¢0MMI%~ION
B,O,P.E. l'ns~ection ~eport
Audio
Cas Detector ? ~:~__ ..........
Blind Ram~ ........ ~_~
Well
/1 / ~e resentaCive ~~~- . ......
ACCUHULAYOR SYSI~i
Full Charg~ Fressure~
Pres, sUre' K{'ter Closure~ ps-ig,
Pump incr, clos. pres, lO0
F~ll Ch~rse Pressure lctai.e~L,' ~ _mi~ ~ sec.
Concrolz~ M~ster ..... ~' _ ............
"
Lo=er KellE_ ~. Tese Pressure
Ball Typ~ ~. ,~es~ P~essure
Insid~ BOP .... ~ ,Tes~ Pressure_
Choke 1,[~nifold ~: ~
Check .Velv~.~.
No. Valves ..... /~__' ................. -__
A,djust~ble Chokes /- ......... ..... :~: -
~'"-'~- STATE OF ALASKA ~-'"'"'
ALA .... OIL AND GAS CONSERVATION CON .... .~SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing ~ Amend order [] Perforate [] Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. Oo Box 100360 Anchorage, AK 9951 0-0360
4. Location of well at surface
1184' FNL, 161' FEL, Sec.24, T11N, R14E, UN
At top of productive interval
1541' FSL, 1228' FEL, Sec.24, T11N, R14E, UN
At effective depth
1323' FSL, 1319' FEL, Sec.24, T11N, R14E, UN
At total depth
1273' FSL, 1340' FEL, Sec.24~ T11N~ R14E~ UN
11. Present well condition summary
Total depth: measured 9685 ' MD feet Plugs (measured)
true vertical 8889 ' TVD feet
5. Datum elevation (DF or KB)
RKB 46 '
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
18-3
8. Permit number
R2 -1 nc)
9. APl number
50-- 029-20776
10. Pool
Prudhoe Bay Oil Pool
None
Effective depth: measured 9.622'MD
true vertical
8834'TVD
Casing Length Size
Conductor 80' 20"
Surface 2570' 13-3/8"
Producti on 81 36' 9-5/8"
Liner 1028'
Perforation depth: measured
7"
feet Junk (measured)
feet
Cemented
None
Poleset
2300 sx Fondu &
400 sx PF
500 sx Class G &
350 sx PF I
400 sx Class G
9520'-9530', 9540'-9580'
Measured depth
1lO'ND
2600 'ND
8872'MD
9600'MD
True Vertical depth
110'TVD
2600'TVD
8200'TVD
8838'TVD
RECEIVED
true vertical
8739' -8748 ' 8758 ' -8795 '
Tubing (size, grade and measured depth)
3-1/2", L-80, 9.6# @ 8635'MD , 5-1/2",26#,11.- 80
·
Packers and SSSV (type and measured depth)
9-5/8" BOT 3-H Dkr (~ 8532'MD. 3-1/2" Camnn TRDP.-TA ~qq%l ~ 9917,
12.Attachments Description summary of proposal ~ Detailed operations ~)r-og'ram []
SEP 2 8 1987
O' - 3034 ,Alaska' Oil & Gas Cons. Commission
Anchorage
BOP sketch
13. Estimated date for commencing operation
October 15, 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~~ jJj~'i,...~ Title Asso~i ~1;~ Engineer
~/ Commission Use Only (SOET) $A2/101
Conditions of approVal
Notify commission so representative may witness
[] Plug integrity [] BOP Test [] Location clearance
ApproVed by
Form 10-403 Rev 12-1-85
IApproval No.
~-,~ p r c ~' ~'-~, . < .'~-~ ~',,
Gommissionor
Date
by order of
the commission Date
feet
7
Submit in triplicate
DS 18-3
PRELINIARY WORKOVER PROCEDURE
1) RU E-line. Perforate the 3-1/2" tubing with circulation charges in the
joint just above the BOT PBR at 8513'.
2) Displace tubing and annul us wi th filtered brine.
3) RU slick unit. Set plug at Otis 3-1/2" XN nipple at 8637'.
4) MIRU workover rig WW #1.
5) Set BPV. ND tree. NU BOP and test.
6) Pull tubing string and LD.
7) Pull and replace 9-5/8" casing packoff.
8) Shut blind ram and test 9-5/8" casing packer to 2200 psi. If
necessary, pick up RTTS to test with.
9) RIH a new 3-1/2" IPC tubing with PBR seal mandrel, treater strings and
SSSV. Sting into PBR barrel. Space out and land 5-1/2" hanger.
10) Set BPV. ND BOP and NU 5-1/2" tree and test.
11) Release rig.
Note: BHP = 3969 psi
Proposed fluid weight = 9 ppg
SA2/IOla
9/25/87
RECEIVED
SEP 2 8 1987
Alaska Oil & Gas Cons. Commission
Anchorage
ANNULAR
PREVENTER
6
PIPE RAHS
5 ·
BLIND RAHS
4
TUBINe
HEAl:)
' 2
1. 13-3/8' CASINO IlIAD
2. 9-$/6' CASINO i~AD
3. .5000 PS1 TUBING HI, AD
4. 13-5/8' - $000 PSI BLIND RAHS
$. 13-5/8' - 5000 PSI PIPE RAFIS
6. 13-5/8' - 5000 PSI ANNULAR
RECEIVED
ACCI~ULATOR_CAPAC I TY TEST
STACK TEST_' ''~
I. FILL BOP STACK ANO HANIFOLO WITH;ARCTIC
CI~CK THAT ALL M~D-DO~ $C1~$ A~[ FULLY f~TRACTED.
PREDETEI~III~ OI~.PTH THAT TEST PLU~ WILL S~AT AND SEAT
IH WELLI'~AD. ~ IN LOCK-DOWN SC~ IN H~AD.
$. CLOe~ ANNULAR Pf:~VENTER ANO CHOKES AND BYPASS VALVES
ON THE I'IANIFOLD.
4. TEST.ALL COtlPON[NTS TO 2~0 PSI AND HOLD FOR I0 HINUTES.
S. INCREASE I:~ESSURE TO 2500 PSI AND HOLD FOR I0 HINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET 0F PIPE RAHS.
7. INCREASE PRESSURE TO $000 PSI AND HOLD FOR 10 HINUTES.
8. CLOSE VALVES DIRECTLY UPSTREArl OF CHOKES. ~LEED DCNVNSTR(
PRESSURE TO ZERO PS1 TO TEST VALVES. TEST REI1AINING UNTESTE
IqANIFOLD VALVES, IF ANY. WITH 5000 PS1LtPSTI::~A/1OF VALVE Ah
WITH ~RO PSI DOWNSTREArl. BLEED SYS TErl TO ~a0 ~Sl.
9. OPEN PIPE RAHS. ~ACKOFF RLINNING ,IT AND ,BULL OUT OF HOLE.
CLOSE BLINO RAHS AND TEST TO 5000 PS1 FOR 10 HINUTES. BLEED
TO ZERO PSI.
10. OPEN BCIND RAHS AND RECOVER TEST PLLI~. HAKE SURE rlANIFOLD
LINES ARE FULL OF ARCTIC DIESLq. AND ALL VALVES ARE SET IN TH~
DRILLING POSITION.
! I. TEST STANDPIPE VALVES TO 5000 PSI.
12. TEST KELLY COCKS AND INSIDE BOP TO $000 PS1 WITH KCX~EY
13. RECC~D TEST INFC~r'IATION ON 8LOWOUT PREVENTER TEST FORrl.
AND SEND TO DRILLING SUPERVISOR,
14. PERFC)Rtl COt'IPLETE BOPE TEST ONCE A wEEK AND FUNCTIONALLY
OPERATE ~,OPE DAILY.
,.
SEP 2 8 1987
Alaska Oil & 6as Cons. Commission
Anchorage
· !
ARCO A
F'·O. Bo× t00:360
Anchorage, A
DATE: June t9, t987
REFERENCE: ARCO Magnetic Tape~ w/listing
~"~t8-.3 5-t8-87 Magtape ~72327 CH CNL Run t
Please .sign and return the attached' copy a.s receipt of data.
$c h
Received By_,
i-IAV[!i ~.:~ ~-; i! :iiil DAY
Rosanne Peek.
I'RAN$ ~873~7
Approved
................. Anch0mge
DISTRIBUTION
Cmnfra l _Fi le,s
Chevron
F'· McF'heeters
Exxon
Mob i l
ARCO Alaska
f'.' ~ 0. Box
A~chorage, A£aska
DATE'. May 28, ~ 987
REFERENCE' ARCO Ca~ed Hole fi)~aL
8-3 5--t8--87 CH CNL Run t , 5" 5'ch
4-32 5-20-87 CET R~i~ t, 5' $ch
I-"'l. ease sign a~nd re~urn ~he at~ac:hed copy as receipt of data,
Received By
HAVE A NICE DAY!
Ro~mn,~e Peek
ATO-t 529
TRANS~ ~87277 ~
ApproYed
Anchorage
DISTRIBUTION
Phi Ltips
PB WeLL Fi les
R & D
$ohio
State of ALaska
Texaco
ARCO Ala~;'ka, Inc
P~O, Box
Anchc~rage, ALaska
[)ATE: Hatch 27,
kEf' ERENCE ' ARCO
3-'t 4 3-t 6-87
4.-4 3-~ 3-'87
4-6 3- ~ 6-8'?
4-t 3 3-t 3-87
4-18 3-- 5-o'?
· :, ..- 23 - 6 ..- 7
7-5 3-8-87
'7--6 3-9-87
7-9 3-6-87
'7 .... t 0 3-8-- 8'7
'7-. J ? 3--J J --8'7
'7 .... ~ 8 3-9--87
J 3-2~ 3--~ 2--8'7
t 4'-4 3-22'"'87
t 8--3 3-1 4-87
t 987
Cased Hol. e Final
Produc¢ion F'rofi Le Run t, 5"
GR/CCL Ru'n t, .5"
Inj. Profi Le Run t, 5"
Inj, F'rofi te Run t, 5'
Pump In 'l'emp. Log Run
Spinner/FLuid Denxity Run t, 5"
Sp inner/FLuid Denxi ty Run
Sp inner Run
Sp i nner/l'emp, Run
Spinner/FLuid Den.s' i fy Run
Sp i nner/l'emp ~ Run
Produc'f ion Profi te RIIn
Sp inner/F' I u i d Dens i t y R ~!~ t , 5 '
In.j.- Profile Run
Temp/Flowmeter/Fluid Density Run i,
I..eak Det-ecf,/Diff.l'emp/Flow, Run t,
Ca i'llC 0
C a m c o
Camco
Ca ~0c o
Camco
C a m c o
Ca mc o
C a m c o
Ca mc o
Ca mc o
Camco
Camco
C a m c o
Camco
Cemc:o
PI. ease .,~ign ar, d return the ,a+~tached ~y as~"eceipt of
Fireceived ~y .................. ~..~ ..... ~[[0'~ ~' ~ ---
HAVE: A NICE DAY~ / .
~ ~aska Oil & Gas Cons. commission
· ,~ ,.. Anchorage
F~ c..= 8 n n e F:' e e k
ATO-t 529
'I" F:,' A N ,'.';' :,~8'71 93 ~
Al:) p rove. d
I) I $ T Fir I B U T I (] N
da~a,
-~ '"' F:'h i I. Iip s
:[: Cen,.ral i:ri Les -..
:,":.C'.hevron PB We I. I. F i les:
D & M I:;: & D
JI. ¢" . ' (.
:.": E x 't' e n.s i o n E x p i. o r a 't i o n -. _~ o I 1 [ .) ....
'11' - . .
,11,
H 8 i" a '~' h o n ..- T e x a c o
;i~ Ho b i L
ARCO AlasKa. Inc.
Post Office Box 100360 ,
Anchorage. Alaska 99510
Telephone 907 276 1215
Date- June 18, 1985
REference: ARCO CH Finals
1-25 Spinner 6-7-85 Run 2 5" Camco
14-35 Spinner 5-30/31-85 i 5". Camco
15-.17 CCL/Spinner 6-6/7-85 I 5" Camco
18~3 Static Temp. 6-5-85 I 5" Camco
/<18~3 Dynamic Temp. 6-3-85 1 5" Camco
Please sign as receipt of data.
Rece i ved by
Pam Lambert
ATO 1429C
·
Trans 166
"~.Gas Cons. . .
Anchora9e Commission
Chevron
Expl. Services
Ex~. Exploration
Exxon
Marathon
Mobil
Phitiip.s
PB Well Files
R & D
Sohio
State of Alaska
Texaco
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage. Alaska 99510
Telephone 907 276 1215
Date: April 23, 1985
Reference: ARCO Pressure
12-26 ~// PBU 4-3-85 DA
16-9 / Gradient Survey
16-14 ~-' Gradient Survey
17-1
17_2
18-3
Gradient Survey
Gradient Survey
Gradient Survey
PBU
Surveys
4-4-85 Camco
4-4-85 Camco
4-6-85 Camco
4-6-85 Camco
4-7-85 Camco
1-9/10-85 DA
Received
Anchorage
Pam Lambert
ATO 1429C
Trans 079
Chevron
~-~& M
Expl. Services
Ext. Exploration
Marathon
Mobil
Mobil E & P
FE~llips
~:-Well Files
.~f&- D~
Seh'io
ARCO Alaska, InC
Post Office Box 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
Date: January 29, 1985
Reference: ARCO CH Finals
~-~fJ'-~-6 Prod. Loggoing Svs.
1-9~ Production Profile
12-19Injection Profile
_--4-14 Spinner
18-3Prod. Logging Svs.
4-4~..~ Spinner
1-9 CNL
15-9'-~epth Determination
~2-22Perf. Record
12-28Perf Record
~-17 EPL
.... 12-27Perf. Record
~4-8 Spinner
4-15 Spinner
~6-3 Spinner
~13-18Spinner
~'6-3 Diff. Temp.
_~-15-9 Collar Log
~2-15 Temp. Survey
12-27-84 #1 DA 5"
1-3-85 #1 Camco 5"
1-2-85 #1 Camco 5"
12-16-84 #1 GO 5"
1-10-85 #1 DA 5"
12-15-84 #1 GO 5"
12-20-84 ~1 GO 5"
11-9-84 ~1 Sch 5"
11-29-84 ~1 Sch 5"
12-3-~4 ~1 Sch 5"
10-4-84 31 Sch 5"
12-1-84 ~1 Sch 5"
12-27-84 #1 GO 5"
12-16-84 ~1 GO 5"
12-21-84 ~1 GO 5"
12-26-84 ~1 GO 5"
12-21-84 #1 GO 5"
12-29-84 ~1 GO 5"
12-24-84 #1 GO 5"
and return tha attached copy as receipt of data.
Received by
Pam lambert
ATO 1'429C
Chevron
D.& M
Exploration Services
Extension Exploration
Texaco
Marathon
Mobile
Mmbile E & P
Phillips
Prudhoe Bay Well Files
R & D
Sohio
State of Alaska
ARCO Alaska, Inc.~ ~
Post Office ~ox 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 15, 1984
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 18-3
Dear Mr. Chatterton:
Enclosed is a Subsequent Sundry Report for the subject well.
you .have any questions, please call me at 263-4944.
Sincerely,
d. Gruber
Associate Engineer
JG/tw
GRU1/L84
Enclosure
If
Alaska Oil & Gas Cons. commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
' " STATEOFALASKA ~'
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WE L LX~]
OTHER []
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 100360, Anchorage, AK 99510
4. Location of Well
Surface: 1184' FNL, 161' FEL, Sec.24, T11N, R14E, UN
5. Elevation in feet (indicate KB, DF, etc.)
RKB 46'
12.
6. Lease Designation and Serial No.
ADL 28307
7. Permit No.
82-109
8. APl Number
50-- 029-2077(;
9. Unit or Lease Name
prudhoe Bray Uni~. _
10. Well Number
18-3
11, Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonmen~ see 20 AAC 25.105-170).
Accepted rig @ 2200 hrs, 09/08/84. Killed well. Set BPV. ND tree. NU BOPE & tstd to 3000 psi - ok. Pulled
tubing. Recovered PBR, packer & tailpipe. RIH w/RTTS; tagged top of liner @ 8595'; tstd csg on backside to
2000 psi - ok. Ran completion assembly w/tail @ 8648', 3-H packer @ 8532' & SSSV @ 2217'. Tstd hanger to
5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Disp tubing w/diesel. Dropped ball & set pkr.
Installed BPV. Secured well & released rig ~ 0200 hrs, 09/16/84.
AlasKa Oil & ~'-,~.~ Cu~',-;. L;cir~p,",isstO~
Anc'aora~e,
Signed14' I hereby~4~_~~certify, that the f, going is true and correct to the beStTitleOf my knowledge.
The space below for Commission use
Area Drilling Engineer
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
R~_v 7-1-RO GRU1/SN79
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Ir, ~
Post Office c~-~x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
September 26, 1984
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 18-3 Recompletion
Dear Mr. Chatterton:
Enclosed is our Well Completion Report and Workover Summary for
DS 18-3.
If you have any questions, please call me at 263-4610.
Si ncerely.,~
T. L. Fithian
Area Drilling Engineer
TLF/tw
JMM/L01
Enclosures
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
~-- STATE OF ALASKA ~
'- -' "~ ALASK; .... -' AND GAS CONSERVATION C _~ ,MISSION ~~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL E~(x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] RECOMpl FTII3N .~,
i2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 82-109 ·
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-20776
4. Location of well at surface 9. Unit or Lease Name
1184' FNL, 161' FEL, Sec.24, TllN, R14E, UN Prudhoe Bay Unit
At Top Producing Interval 1O' Well Number ,
1314' FSL, 991' FEL, Sec.24, TllN, R14E, UM 18-3
,,
At Total Depth 11. Field and Pool
1110' FSL, 1072' FEL, Sec.24, T11N, R14E, UN Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool
46' RKB ADL 28307
,
12. Date Spudded07/30/82 13. Date T.D. Reached08/12/82 14' Date C°mp" Susp' °r Aband' J 15' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns08/19/82 N/A feet MS L 1
17. Total DePth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey ! 20. Depth where SSSV set 21. Thickness of PermafrOst
9685'MD,8894'TVD 9622'MD, 8835'TVD YES [-X NO []I 2223 feet MD 1900' (Approx)
221 Type Electric or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/Cal, CNL/GR, CBL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. !GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD =AMOUNT PULLED
20" 91.5# H-40 Surf 80' 30" 2940# Pol eset
13-3/8" 72.0# L-80 Surf 2600' 17-1/2" 2400 sx Fondu + 400 sx )F "C"
9-5/8" 47.0# L-80 & Surf 8618' 12-1/4" 500 sx Class "G" + 300 ~X PF "C"
S00-95
7" 29.0# L-80 8587': 9665' 8-1/2" 340 sx Class "G"
24. Perforations open to Production {MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
9520' - 9530', w/4 spf, 90° phasing 5-1/2" surf - 3035'
9540' - 9580', w/4 spf, 90° phasing 3-1/2" 3035' - 8648' 853;~'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF' MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production 1 Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested pRODUCTION FOR OIL~BBL GAS-MCF WATER-BBL cHoKE SIZE I GAS-OIL RATIo
TEST PERIOD I~
I
Flow TUbing Casing P;essure CALCULATED 'OIL-BBI~ GAS-MCF WATER-BBL OIL GRAVITY-APl (c0'rr)
Press. 24-HOUR RATE J~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
RECEIVED
OCT o 1 ]984
Alaska Oil a Gas Cons. Commission
Anchorage
FOrm 10-407 Submit in duplicate
Rev, 7-1-80 JHH/WC22 CONTINUED ON REVERSE SIDE
· ~ .'-,. ~-' .,~- ?:i ~-.? ~'i~o'~O~'ic' i~z~,·E'i~: ;~ ~'-'-"- : ' ,; , . ,'" ....
"' 'FORMATION'TESTS '
NAME Include interval tested, pressure data, all fluids recovered and graviW,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sad] erochi 1: 9060' 8309 N/A
GOC 9404' 8630'
Base Sadl erochi t 9579' 8794'
31. LIST OF ATTACHMENTS
Workover Procedure Summary
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
f~~y~ Area Dr,,,,ng Engro
Signed '~'/~ ' Title Date
INSTRUCTIONS
General: This form is designed for submitting a.complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells:. Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed fo.r separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Fnrrn 1 n-~n7
DS 18-3
WORKOVER PROCEDURE
Accept rig @ 2200 hrs, 09/08/84. Attempt to kill well w/9.2 ppg brine.
Well still flowing. Raise brine wt. to 9.3 ppg in pits. Circ. out well to
9.3 ppg brine. Observe well. No flow. ND tree. NU BOP. Stack tested to
only 3000 psi. Replace seals on BOP. Test BOP - ok. RU to pull tbg; pull
free same. Well kick observed. Break off tbg hanger. Stab TIW valve.
Close hydril. Circ. well. Fluid loss occurring @ 20-30 bbl/hr. Pump pill
(50 bbl Bridgesal) to perfs. Circ. bottoms up; loss rate down to +5 BPH.
Level out brine wt. @ 9.3 ppg. POH w/tbg. Change rams in BOP to 3-1/2"
middle, 5-1/2" in top. Seat test plug. Test BOP to 5000 lbs; pull test
plug. RIH, tag PBR; pull 2 stands. Circ. brine and POH slow due to
swabbing. RU & RIH w/HOWCO RTT's to TOL @ 8595'. Test csg to 2000 psi -
ok. POH w/RTTs. RU & RIH w/new completion assy. Land tbg hanger & test to
5000 psi. Tbg tail set @ 8648', packer @ 8532', SSSV @ 2217' ND BOP. NU
tree and test to 5000 psi. Displace tubing vol. w/diesel. 'Drop ball and
set packer. Secure well & RR @ 0200 hrs, 09/16/84.
JMM/13: tw
RECEIVED
OCT 0 1 1984
Alaska 0ii & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. :
Post Office Bv~ 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
September 7, 1984
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ssion
3001 Porcupine Drive
Anchorage, AK. 99501
SUBJECT: DS 18-3
Dear Mr. Chatterton-
Enclosed is a Sundry Notice for the subject well. We propose to
pull and replace the tubing and repair this well as necessary.
Since we ~expect to start this work on September 8, 1984, your
earliest approval will be appreciated. If you have any
questions, please call me at 263-4610.
Sincerely,
T. L. Fithian
Area Drilling Engineer
TLF/JG/tw
GRU1/L28
Enclosures
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
! " STATEOFALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
ARCO Alaska, Inc. 82-109
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-2t
4. Location of Well
1184' FNL, 161' FEL, Sec.24, T11N, R14E, UN
9. Unit or Lease Name
Prudhoe Bay [Jn{~_
10. Well Number
18-3
11. Field and Pool
Prudhoe Bay Field
6. Lease Designation and Serial No. Prudhoe Bay 0i l Pool
ADL 28307
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
5. Elevation in feet (indicate KB, DF, etc.)
RKB 46'
12.
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing J~3 Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc., proposes to pull and replace the tubing string and completion assembly in well 18-3.
Procedure will be as follows:
1. Kill well with NaC1 brine.
2. Pull and lay down tubing and completion assembly.
3. Test 9-5/8" casing and repair as necessary.
4. Run new tubing and completion assembly.
A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. BOP equipment will be tested weekly and
operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the
permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The
subsurface safety valve will be installed and tested upon conclusion of the job.
Estimated Start: September 8, 1984 RECEIVED
~bsequent Work Reported
SEP 0 7
0il & Gas Cons.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~.{ ~. ,~4~'.~,~,_~.~ ~/~t~ ~,/~~ Title Area Drill lng Engi near
The space below for Commission use
Date
Anchorage
,
Conditions of Approval, if any:
tltlGIIIAI. SIGN[Il
LONliilE C. SlllTIi By Order of
Approved by COMMISSIONER the Commission
Approved
Retu~'neel~
Form 10403
....... n GRU1/SN39
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc.
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
June 6, 1984
Reference:
ARCO Cased Hole Finals
D.S. 1-26-~' 5-17-84
D.S. 2-17/~' 5-12-84
D.S. 4-1 5-6-84
D.S. 5-8-' 5-5-84
D.S. 6-18~- 5-22-84
D.S. 9-4~ 5-7-84
D.S. 9-6/ 5-7-84
D.S. 12-17/ 5~14-84
D.S. 12-23f 5-16-84
· ? 5-
D.S. 13-34/ 5 17-84
D.S. 13 98/5-16-84
D.S. 16 13 -20-84
D.S. 17-7/ 5-25-84
D.S. 17-10 5-18-84
D.S. 17-10"~ 5-18-84
D.S. 18-3- 5-14-84
Collar/Perf Log Run 1 5" 'GO
Collar Log to set Casing Patch
Run 1 5" GO
CN/MSN/GR
CN/MSN/GR
CPL/TDT-M w/listing
CN/MSN/GR
CH CNL
CPL/TDT-m w/listing
Run 2 5" DA
Run 1 5" DA
5" Sch
Run 1 5" DA
Run 1 5" GO
5" Sch
X-Y Caliper Log w/Borehole Volume
Run 1 5" GO
CPL/TDT-M w/listing
CH DIL
Collar/Perf Log
Collar/Perf Log
CET Log
CCL/Perf Record
Temperature Log
5" Sch .
Run 12 5" Sch
Run 1 5" GO
Run 1 5" GO
Run 1 5" Sch
Run 1 5" Sch
Run 1 5" GO
/ase and return the attached receipt of data.
sign
copy
as
Be PATRIOTIC! - Hang out your flag on the 14th.
Kelly McFarland
ATO-1429F
Trans. 9231
D ISTRIBUT ION
'Chevron
D&M
Drilling
Exp. Services
Ext. Exploration
Exxon
~tty
Marathon
PhilliPs ':'":'"' .:...::, ':
Prudhoe Bay Well File~
,?
R & D '",~;'o,,?
Carolyn Smith
Sohio
· State of Alaska
I II I
·
C.,OI~lDLIc'-rol~. AS 81JI IT
¥_- ~.o~-4-e.~'
L~.~ 'TO° I"~' 4'T.3~1~"
ERTI~ THAT I AM ~%~'''''''c~n~
I HEREBY O ~,.~.. . ..~
ROPERLY REGISTERED AND ~,~-' ~ '.~_~.
P PRACTICE ~-'~ ~ '~' ~ ' TH '-7 ~
SURVEYING IN THE STATE O -'"'t .... ~
REPRESENTS AN AS-BUILT SURVEY ~ '-. - ~ ~;ccl z ~
MADE BY ME, AND THAT ALE ~. ' ' .'
· 5276-S
DIMENSIONS AND OTHER D~AILS ~?".- ' '"'
ARE CORRECT, AS OF: 5J ~ ~',' '
I III I I I I~ I
ARC()
~-,. ~.,. -
SHE't:
I
0e
!
i
ARCO Alaska, Inc.
Prudhoe Bay Engineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer.
May 26, 1983
Mr. C. V. "Chat" Chatterton
State 9f Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Re:
DS 15-3
DS 15-11
DS 18-1
DS 18-3
DS 18-7
DS 18-10
Permit No. 82-30
Permit No. 81-132
Permit No. 82-80
Permit No. 82-109
Permit No. 82-128
Permit No. 82-143
Enclosed are Completion Reports for work done on the above-
mentioned Wells.
Very truly yOurs,
D. F. Scheve
Regional Engineer
DFS/JCD/cl
Enclosures:
cc: Sohio Petroleum Co.
ARCO Ala~k.~ In¢: il a Sub,,Id~a,y of AflantlcRIchfieldCompany
RECEIVED
JUN- 2 1983
Alaska
Anct~0ra~le
STATE OF ALASKA
'- ' ALASK,~,, ,L AND GAS CONSERVATION C...iMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ....
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 82-109
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20776
4. Location of well at surface 9. Unit or Lease Name
1184' FNL, 161' FEL, Sec. 24, TllN, R14E, UM Prudhoe Bay Unit ...
At Top Producing Interval i0. Well Number
1314' FSL~ 991' FEL, Sec. 24, TllN, R14E, UM 18-3
At Total Depth ~ 1. Field and Po°l
1110' FSL~ 1072' FEL, Sec. 24~ TllN, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) [ 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool
46' RKB[ ADL 28307
12. DateSpudded7/30/82 13. DateT.D. Reached8/12/82 14'DateC°mp"Susp'°rAband' I15' Water Depth' if °f~sh°re 116'N°'°fC°mpleti°ns8/19/82 N/A feetMSL 1
"l'J.'Total Depth (MD+TVD} 18. Plug Back Depth (MD+TVP)19. OirectionalSurvey I 20. Depth where SSSV set i 21.Thickness of Permafrost
9685'MD~ 8894'TVD 9622'MD,8835'TVD YES [Ix NO [] nipple @222~et MD 1900' (approx)
22. Type Electric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/Cal. CNL/GR. CBL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
9~" 01 c,.~. ~-~,n Surf. 80' 30" 27:0 ,~,~ P~o~
lq-3/8" 79 (~d~ T.-RI9 S'2r~. 9600' 17%" 1400sa Fond'_' & ;:O0s.x ~_'erm..afro~t C
(}-K/R- ;,7_~ T,-R~. -qurf. 86!8' 12¼" 50Osz Class G & 390s:. Parm,..afrcst C
7" 9. q.O~ L-ga R~R7~ qRR~' R~,, 340SX C!~__~s G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE' DEPTH SET (MD) PACKER SET (MD)
9520'-9530'MD 4spf h~" 85!:0' 8530~
9540 ' - 9580 ' MD
26. ACID, FRACTURE, CEMENT SQUFEZE, ETC.
,,
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
8739' -8795 'TVD M/A
Ref: BHCS 8/18/82
· .
, ,
27. PRODUCTION TEST
, , ,
Date First Production '1 Met'hod of Operation' (FloWing, gas lift, etc.)
4/20/83[ F1 owing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GA'S-MCF WATER-BBL CHOKE SIZE I'GAS-OIL"RATIO
5/11/83 13.5 TEsT PERIOD.e . 1997. 1020 59 90 6~3
Flow Tubing Casing Pressure CALCULATED -~ OIL-BBL GAS~MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 260 N/A "24-HOUR ~RATEI~ ~ ~'¢~ )~')v~
28. CORE DATA
BriefNo~edeScription of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cor~%chi_ps._~C E I Y L~ D
/Uaska 0it
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sadlerochit 9060' 8309'
G/O Contact 9404' 8630'
Base Sadlerochit 9579' 8794' N/A
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Title R~,ic)l'~q] ~.n~n~r Date
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas 'injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
.Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
ARCO Alaska, Inc. ,~'"'~'~
Post Office BC,~ 360
Anchorage, Alaska 99510
Telephone 907 277 5637
April 14,
Reference:
1983
\
Arco Cased Hole Finals
DoS,
2-11/ 12-2,7'82 c.A.T.
//
13-7 / 3-20-83 ,Spinner Log
13-17 ~ 2-17-83 ~,PL
2-19-83 EPL
Run 1
Run 1
Run 2
5" DA
5" Camco
5" Sch
5" Sch
D.S. 14-9B~ 3-31-83
D.S. 14-18/3-30-83
D.S. 14-29~/?
Spinner 5"
Spinner. 5"
Spinner 5"
Camco
Camco
Camco
D.S. 18-1/-2-16-83
?D;S.: 8 3-28-83
' :': ' 2-.16-83
D.S.
CPL/Volan w/Listing
CPL/prOducibility w/Listing'
CpL/Volan w/Listing
i8-6~/ 2-16-83 CPL/Volan w/Listing 5"
18-7~'/2-17-83 CPL/Volan w/Listing · 5"
18-1~/~ ~-25-83 CPL/Producibility w/Listing
~2-16-83 CPL/Volan w/Listing 5"
se sign 'and return the attached copy as receipt of data.
5" Sch
Sch
5" Sch
Sch
Sch
Sch
Sch
Kelly McFarland
AFA-403
Trans. # 273
DISTRIBUTION
NORTH GEOLOGY
R &D
DRILLING'
PHILLIPS
SOHIO
MARATHON
CHEVRON
.,
· ,
EXXON
MOBIL
GETIY
D&M
STATE OF ALASKA
DALLAS
ARCO'AlaSka, Inc.~
Prudhoe Ba), ~ngineering
Post Office Box 360
Anchorage, Alaska .99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
February 10, 1983
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage,'AK 99501
Dear Mr. Chatterton:
Re:
D.S. -18-1 Permit No. 82~80
D,S~ 18~ ~ Permit No. 82-109
D.S. 18-7 Permit No. 82-128
D.S. 18-10 Permit No. 82-143
Enclosed are "Subsequent" Sundry Notices detailing work done on
-the above-mentioned well.
Very truly yours,
D. F. Scheve
DFS/TKKW/kn
Attachments
cc: Sohio Petroleum
ARCO Aleska, Inc. I~ a Subsidiary of AtlanllcRl~chfleldComp.ny ~/~?~.
" STATE OF ALASKA ~',
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL I~ OTHER []
7. Permit No.
2 ' N ar~t~foO PJ~ ? h°~ k a , Inc. 82-109
8. APl Number
3. Ad~res~. Box 360, Anchorage, Alaska 99510 50- 029-20776
9. Unit or Lease Name
Prudhoe Bay Unit
1314' FSL, 991' FEL, Sec. 24, TllN, R14E, UM
1110' FSL, 1072' FEL, Sec. 24, TllN, R14E, UM
5. Elevation in feet (indicate KB, DF, etc.)
46 ' RKB
6. Lease Designation and Serial No.
ADL 28307
10. Well Number
D.S. 18-3
11. FieldandPool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly stateall pertinent detailsand givepertinentdates, includingestimateddateofstartingany
proposedwork, forAbandonmentsee20AAC25.105-170).
Began perforating operation 12/17/82. Pressure tested tree, casing and wirelin,
perforating equipment. Perforated 9520'-9530' and 9540'-9580' MD (ref: BHC's 8/18/82'
with four shots per foot. The well flowed to a tank to clean up. After perforating th~
well was shut-in for 24 hours and a static pressure survey was run. After the stati
survey the well remained shut-in. The SSSV was run and tested. Installed and teste
the tree cap. Secured well 2/4/83.
RECEIVED
FEB l 4 1983
Alaska 0il & Gas Cons, ~;0mrnissJ0n
Anchorage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ..... . .... _ _ - Title
The space below for Commission use
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, inc.
Post Office B.~.~3'60
Anchorage, /~ "'ka 99510
Telephone 907 277 5637
January 21,
Reference:
1983
Arco Pressure Data
D.S. 12-6 11-21-82
D.S. 18-1 12-17-82
D-S. i8~3 12-19-82
'D.S. 18-7 12-25/26-82
Static Pressure Survey
Static Pressure Survey Data
Static..Pressure Survey
Static Pressure Survey Data
S~atic Pressure Survey
~Static Pressure Survey Data
Static Pressure Survey
Static Pressure Survey Data
Camco~.
Ca/nco
Camco
Camco
se sign and return the attached copy as receipt of data.
Kelly McFariand
AFA-4 03
Trans. # 070
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
PHILLIPS
SOHIO
MARATHON
CHEVRON
STATE OF ALASKA
DALLAS
Post Office Box 360
Anchorage, AI/~ 90510
Telephone 90? ~ 7 5637
January 20,
Reference:
1983
Arco.Cased Hole Finals
D.S. 14-6
D.S. 14-6
D..S. 14-28
D S 18-1
D.S. L8'3
'D.S. 18-7
12-22-82 COmpletion Record Run 1
12-12-82 P.A.L. .. Run 1
12-25-82 Completion Record Run 1
12-15-82 Perforating Record Run 1
12-17-82 Perforating Record Run 1
12-19=82 Completion Record Run 1
5"
5"
5"
5"
5"
SCh
Sch
Sch
Sch
Sch
Sch
/P/lea se
sign and return the attached copy as receipt of data.
Kelly McFarland
AFA-403
· Trans~ # 060
DISTRIBUTION
NORTH GEOLOGY
R & D
DRILLING
PHILLIPS
SOHIO
MARATHON
CHEVRON
EXXON
MOBILE
GETTY
D &'M
STATE OF ALASKA
DALLAS' ~. "/
Anchorage
ARCO Alaska. Inc ~s a Suhs~char¥ of AllanlicRicflf,elclComDanv
ARCO Alaska, Inc.~
.Prudhoe Ba> !~gineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. SCheve
Regional Operations Engineer
December 1, 1982
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Al.aska 99501
Dear Mr. Chatterton:
Re:
D.S. 18-1
D.S. '18~3
D.S. 18-7
D.S. 18-10
Permit No. 82-80
Permit No. 82-109
Permit No. 82-128
Permit No. 82-143
Attached are "Notice of Intention" SundrY Notices for work
proposed On the above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/TKKW/lmi
Attachments
cc: Sohio Petroleum
STATE OF ALASKA
ALASKA _,~L AND GAS CONSERVATION L MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~ OTHER []
2. N a~,~,~0Op~rf ~o~ k a 7. Permit No.
, Inc. 82-109
3 Address 8. APl Number
· P.O. Box 360, Anchorage, AlaSka 99510 50- 029-20776
9. Unit or Lease Name
Prudhoe Bay Unit
4. Location of Well
1184' FNL, 161' FEL, Sec. 24, T11N, R14E, UN
1314' FSL, 991' FEL, Sec. 24, T11N, R14E, UN
1110' FSL, 1072' FEL, Sec. 24, T11N, R14E, UN
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
46' RKB I ADL 28307
12.
10. Well Number
D.S. 18-3
1 1. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
Pool
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate I-~X Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit
Sand in this Prudhoe Bay Unit well. Upon perforating, the well will be flowed to
a tank for clean-up and evaluation. All wireline work will be done through a
5000 psi WP BOP/Lubricator, tested to working pressure. The SSSV will be installed
at the conclusion of the perforating and clean-up operation.
Proposed Perforation Intervals'
Ref'
BHCS 8/13/82
9540-9580' MD
*9520-9530' MD
'9510-9520' MD
mJ~,eeluent Wor~ tlepo~t~ '
'.- Oate(l ~[----~'-'"~
*Perforations to be added if needed for rate.
RECEIVED
on Form .No,
DECO 1 ].982
Alaska 0ii & Gas Cons. Commission
Anchorage
14. I herebyj~rtify that the f,j;~egoing is true and correct to the best of my knowledge.
Signed~,~, .... V .... Title Regional Engineer
The space below for Commission use
Date
Conditions of Approval, if any:
Approved by
BY LOCalE C. SMilil
COMMISSIONER
Approved Copy
Returned
!
By Order of
the Commission
Date
Form 10-403 Submit "Intentions" in Triplicate
..... an~l "Z~llheOt'lllAIq? I~Annrte" in r')llnlic_Rl.p_
ARCO A a, Inc.
pq tllo.ic , 360
Ar~orage, Alaska 99510
Te~phone 007 277 5637
September 30, 1982
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Well Completion Reports
Dear Mr. Chatterton·
EnclOsed are completion reports and gyroscopic surveys for the
fol 1 owing wel 1 s':
DS 13-32
Sincerely,
P. A. Van Dusen
District Drilling Engineer
PAV/JG:sm.
Enclosures
GRU2/L4
· - · , ,r-~ STATE OF ALASKA ~ ~~
ALASKa- ![,,, AND GAS CONSERVATION C , iMISSION
WELL COMPLETIGN.OR RECOMPLETIO EPORT AND LO
1. Status of Well Classification of Service Well
OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of OPerator 7. Permit Number
ARCO Alaska, Inc. ' 82-109
3. Address 8. APl Number
P.O. Box 360, Anchorage, Alaska 99510 5o-i(Y2~-20776
4. Location of Well at surface 9. Unit or Lease Name
1184'FNL 161'FEL, Sec. 24 T11N, R14E UM -Loc~TiO~-'- Prudhoe Bay Unit
, , , VERiFiED .
At Top Producing Interval 10. Well Number
1314'FSL, 991'FEL, Sec. 24, T11N, R14E, UM 'Surf.__~ 18-3
iB.H. ~ .F~ ._ 11. Fieldand Pool
At Total Depth ;,~ ....
1110'FSL, 1072'FEL, Sec. 24, T11N, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.)' I 6. Lease Designation and Serial No.
46'RKBI ADL 28307 Prudhoe Bay 0il 7ool
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
7/30/82 8/12/82 8/19/82I N/A feet MSL 1
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set ] 21. Thickness of Permafrost
9685'MD, 8894'TVD 9622'MD, 8835'T~DwEsI~ NO[-][ nipple@2223aetMDI 1900' (approx)
22. Type Electric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, CNL/GR, CBL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 · Surf 80' 30" 2940 Cf Poleset
13-3/8" 72.0Cf' L-80 Surf 2600' 17-1/2" 2400sx Fondu & 400sK .PermafroSt C
9-5/8"' 47.0# L-80 ~ Surf 8618' 12-1/4" 500sx Class G & 300sx Permafrost C
S00-95
7" 29.0# L-80 8587' 9665' 8-1/2" 340sx Class G
24. Perforations open to production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 8640' 8530'
26. ACID, FRACTURE, CEMENT SQUEEZE, E-ILC.
None DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/A
~/A PRODUCTION TEST
Date First Production ' I Method of Operation (FloWing, gas lift, etc.)
I
Date of Test Hours Tested iPRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATERoBBL OIL GRAVITY-APl (corr)
Press. 24_HOUR.RATEtl~
28. CORE DATA ~'~
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
~-.-~. NasV,~ Oit I~ GaS r,,o~s, comm~smun''-
A~ch0~age
·
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
· . TESTS
GEOLOGIC MARKERS FoRMATI'ON ':
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sadlerochit 9060' 8309'
G/0 Contact 9404' 8630'
Base Sadlerochil 95.79- 8794' N/A
i
31. LIST OF ATTACHMENTS
Drilling History, Gyroscopic Survey (2 copies)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
.,
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is:completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be Separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
DS 18-3
DRILLING HISTORY
NU 20" Hydril & diverter. Spudded well @ 0600 hrs, 07/30/82. Drld 17-1/2" hole
to 2620'. Ran 67 jts 13-3/8" 72#/ft, L-80 BTC csg w/shoe @ 2600'. Cmtd
13-3/8" csg w/2400 sx Fondu & 400 sx Permafrost C. ND 20" Hydril & diverter.
Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi -
ok. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd f.orm to 12.5 ppg
EMW - ok. Drld 12-1/4" hole to 7623'. Mud wt in 10.3 ppg, out 9.8 ppg (gas
cut). Well flowing - no pit gain. Shut well in for 30 min. build up. Bled
off pressure. Attempted to drill ahead while weighting up to 10.5 ppg. Vented
gas thru degasser. Cont circ while wtg up to 10.8 ppg to stop gas cut.
Continued drlg 12-1/4" hole to 8850'. Ran DIL/SP/GR/FDC/CNL f/8600'-2600'.
Reamed 8590'-8850'. Drld to 8925'. Ran 255 jts 9-5/8" 47#/ft L-80/SO0-95, BTC
csg w/shoe @ 8918'. Cmtd 9-5/8" csg w/500 sx Class G. Instld 9-5/8" packoff &
tstd to 5000 psi - ok. Tstd csg to 3000 psi - ok. Drld FC & cmt. Drld FS &
2' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 9685' TD
(08/12/82). Ran DIL/SP/BHCS/GR f/9681' - 8900', FDC/CNL/GR/Cal f/9677'-8900'
cont w/CNL/GR to 8500'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 bbls H20,
300 sx Permafrost C, 131 bbls Arctic Pack. Ran 26 jts 7" 29#/ft, L-80, BTC
liner f/8587'-9665'. Cmtd 7" lnr w/340 sx Class G. Drld cmt to 9622'PBTD.
Tstd lnr lap to 3000 psi - ok. Displaced well to NaC1. Ran CBL f/9614'-8471'.
Ran 4-1/2" completion assy w/tail @ 8640' & pkr @ 8530'. Tstd tbg hanger &
packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Nipple
for SSSV @ 2223'. Secured well & released rig @ 1900 hrs, 08/16/82.
Gyroscopic survey ran 08/19/82.
RECEIVED
OCT l .l ]1982
Alaska Oil & Gas Cons. Ccrnmi~sJon
Anchorage
Eastman/
Whipstock l
A PETROLANE COMPANY
REPORT
of
SUB-SURF,4CE
DIREC TIONA L
SURVEY
Prudhoe Bay, North Slope, ALaska
LOCATION
JOB NUMBER
TYPE OF SURVEY
Directional Single Shot
DATE
30-Jul-82
SURVEY BY
Controlled Drilling Consultants
OFFICF
ARCCI Al_ASEA, INI!:.
DS 18, WELl.. NO | 3 J]lSS (C][IC)
F'RL.I[~HOE BAY, NORTH SLOF'E,
DSS, 0-8727 MIll, DRILL. ER.~ ALTON R. CHAPMAN
DATE RUN: 30-JUL-82
SLJRVEY PROVIDED BY CONTROLI_ED DRILLING CONSULTANTS
UERTICAL. SECTION CAI...CULATE])
RECORD OF SURVEY
RADII.IS OF:' CURVt~I'I.IRE METHOI.I
F;,' C 0 A [.. A S K A, Iil C ·
mS 18, WE:LL NO; 3 J)SS
:'RIJBHOE BAY, NORTH SL. OF'E:.', AI..~SKA
( CDC )
COMPUTATION
TIME [mATE
13;27;42 13-AUG-82
PA'GE t, tO. ' i
TRt.IE
iEASURED DRIFT DRIFT COURSE VERI'ICAI_ VERTICAL SUBSEA R E C T A N G U L. A R C L 0 S U R E DOGLEG
DEPTH ANGLE DIRECTION I..ENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERIT
FEET [m M [m M FEET FEEl' FEET FEET F'EET FEET D M DG/100F
O. 0 0 0 0
2600. 0 0 0 0
.,.~7~73. ,.* 1? S 3 0 W
2918. 8 56 S 8 0 W
.S040. tO 30 S 7 0 W
O. 0.00
2~00. 2600.00
193. °792 90
125. ~:917,15
122. 3037.39
0.00 -46.00
0.00 25.54,00
5,07 2746,9O
17.69 2871 , 15
37.56 2991~ +39
0,00 0.00 0.00 0 0 0.00
O,O0 0,00 0.00 0 0 0.00
5.38 S 0.28 W 5.39 S 3 0 W 1.88
18.52 S 1.55 W 18.59 S 4 47 W 4.60
~8_,93 S 4,23 W 39.16 S 6 12 W 1.29
~1~.,.. 13 1~ S 8 0 W
5284. 17 30 S 6 0 W
3406, '20 12 S 6 0 W
34~8 o,) 3f) R 8 0 W
3589. 22 42 S 1.3 0 W
122. 3156.78
1°°..~.. 3274.40.
122, 3389.85
92, 3475,53
91. 3559.54
61.74 3110.78 63.77 S
92,83 ~228,40 ?~,8~ ~
130.59 3343.85 135.01 S
16~',,.. 84 3429.5~ 168 · 25 S
197,02 ~513,54 ~0~.., ~ S
7.50 W 64.~1,. S 6 43 W '2.°?~
!!,44 W 9~,50 S 6 48 W 3( S
15.56 W 135.91 S 6 34 W ~.~ ~11
19.64 W 16~.40 S 6 ~9 W 2.62
2~,0!.W 204~9 S 7 !9 W 2.12
S680. 23 54 S 14 0 W
S801. 26 30 S 14 0 bi
4269~ 29 18 S :[5 0 W
4790. 30 12 S 15 0 W
5313. 50 30 S 16 0 W
5829. 32 18 S ].9 0 W
589]., J2 42 S 19 0 W
641.8, SS 48 S '21 0 W
6729, 33 24 S 20 0 bi
7127, 33 0 S 20 0 W
'7446. ;.{2 6 S 20 0 W
"".. 8. "),.. 0, ..,':" .').. ,'),,S ,-.. 0 0. W
8102, 2ii) 0 S 19 0 W
8227., ?,6 48 S :;:.':00 W
i?,727~ 24 24 Si; 20 0 bi
521, 4618.48 75 ~
s=' .. ,.60 33 ~"'~
5. 16, ...... ,10, ,,.~'),. 1286 · 38 5464' 22 ' 1 ~) ' ' · ~"
62, 5562 S 55
..... 1 13t?.62 , 1~,51 12~!,82
5')7, 6003,23 1608.,~,.. 5957.23 1563.33
Sll. , 6962,~,. ~.,., 1780.2~. 6216.26 1724.5~..
S9"'o. 65e"., ,,, 30 1997.92 6549.30 1929. ~'::'~ ,..
34.41 W 240.11 S 8 14 W
88 w 291~4.~ 8 9 15 W
70 w 50~.85 s 11 30 w
61W 768.05 S 12 41W
23 W 1032.08 S 13 24 W
1,39
2.15
0.61
0.17
0.11
320.06 W 1300.33 S 14 15 W
330,9! W 13~3,5~ S 14 22 W
429.73 W 1621.32 S 1.5 2'2 W
490.00 W 1792o79 S 15 5;). W
564.53 W 201.0.22 S 16 19 W
0,46
0.65
0.29
0.22
0,10
319. 6864.19 2169.37 6818.19 2090.60 S 623.24 W 2181.52 S 16 36 W
S94. 7184.58 2362.06 7138.58 2271,86 S 689.21 W 2374.10 S 16 53 W
28'2, 74:'~1,2:1. 2498,56 7385.21 2400,73 'S 734,84 W 2510~67 s 17 I w
'-'~'":;=' 24~' S
'l, 2f:;, 7542,19. ~..,~ .... ~.?? 7496.1.? ,.~4.95. S 754.04 W 2568. .14 17 4 W
50C,. 7993.o7 ....... 2771.79 7947,07 ')657.95 S 827.93 W 2783.91 c) 17 18 W
0.56
0.73
1,03
0.48
F I iq A I... C I... 0 E.:; tJ R E -.. D I R Iii; ~".'. 'F I 0 t,~.:
D I S T A N C E;
F; ].7 DEGS .1.8 M.[NS 5 SEC,, W
'2 ? 83° 91 F E; E: T
· e,t,i.IF'f C:H~:~RT"S RELATED' DATA FILE * -'
:~I:('CO AL. ASKA, INC,
';-'.'!'; ].8~ WEi...L~ f-./.O~ 3 DSS
:' I:~' LI [I H 0 E' B A ¥, N 0 R 1' FI ..-) L.J F' E.,
( C DC )
::;UF;.'.VIEY FIL. E: NUMBER 096
BOTTOM HOI...E ASSEi"IRL. Y
VAI...LJE. S L.ISlii;]) FOl.'( ]iI~:'F:'I'H ARE J'tD
0 E F:' -I" I"1
D E: S C R I I::' 1' I 0 N
11. O o O0
2620,00
3895,00
7930 ,, 00
c:: o.") S 0 ~
~...,' ~.,.... ~. ,,.,.,
SI'RAIGHT HOI...E A$SEi'iBL..Y
,.JE'1'I'I NG ASSEMBI...Y
F'ACKE:D HOLE
PACKED I-.IOL. E ASSEMBL. Y
F' A C K I:i: D I..I 0 L. E A S'.ii!; E M B L Y
[I R I t.. I... I i'.! G D A Y' S
V A L. U I.'i: S !.J S E [I I::' 0 I:;.*
OEPI'H AI::.'.E rtl)
I) A Y
.
3
4
5
:
7
10
1. 1
.¢..
13
14
I) E F:' T FI
2620.00
,.:. 6.,:.,,), O0
2620,00
374 ',2.00
5 91. 0 · 0 ()
'::;":' ~:i0 ()
-.~ ..Z -.~ ,':~
..' ,.,.., .... 00
7850. O0
8:3:1. 0.00
8 8 00. 0 0
8 8 8 0 ,, 0 0
F': o,':.":: /~ 0
9340., 00
9685,00
W.E 1.61--i'1'I)N i:.-: I. 'r
WEIGHT .!.':',,. C:IUI::.i-,~ .... i::'ER :l.,:"mO POUNDS
V ~ 1.. !.J E $ U.'-'S E !) F' 0 R i)r:i F:' T H A R i:: iq D
I) E F:' 1' H
WEIGHT
110.00
2620. O0
3895.00
7930.00
8925 ,, O0
60.00
65°00
60°00
65.00
40.00
REVOL. LJ'!'i. ONS F'ER MINLJTE
VAI...LJE:S IJSED F OF,'. DEF"lrH ARF MD
I) E F:' "!" i'-I
150.00
1 O0 + 00
:1. O0 + O0
l 00.00
.1. 0 (). 00
'DS 18~ 14ELL NOt 3 GHS JOB NO~ ~AOSB2G0458 .
PRUDHOE BRY~, NORTH SLOPE~ RLRSKR '
.......... eHS"~--O~?550-HD~--S'URUEYORI-PEPFERI~ORH~-.~..ER----DA-TFs--RU'N~~Ue-e2
CAHERA NO~ 1644 GYRO NOt 632
..... 5-gO-"DEO~-'-A/U-'NO~ t56'2 ........................
FORESIGHTt S12
....... ~/E'RT113AE--SEC-T.]E.ON--CALCULAT:
A PETROI._ANE COMPANY
i,
, .-REC, ORDLOF-$URUEY
..
RRD[US OF CURYRTURE HETHOD
ARCO ALASKA~ INC,
DS '18i-WELL-NO t' 3 ........ GHS ........ _L ........... JOB-'NOt---A088'2~0'458
PRUDHOE BAY~ NORTH SLOPE~ ALASKA
COHPUTATION PAGE NO.
T~E .......... ----DA~E .........
13~42t26 13-SEP-82
1
'HEASURED DRIFT DRIFT
DEPTH ANGLE DIRECTION LENGTH: DEPTH
........ FEET ............. D ..... H .......... D .... H ....... I
....... TRUE
COURSE UERT!CAL UERTtCflL' 5UBSIE¢I R E C T A N-6 U L fl R C L 0 $ U R E DOGLEG
SECTIOH'.. :: TVD C 0 0 R-D I N A T E S DISTANCE DIRECTION SEVERIT'
FEET ......... FEET
200, 0 !5 S 37 0 E
300, 0 0 0''0
...... --400
)500, 0 15 S 24 0 E
....... 600~-.-.---0--3
700. 0 30 S 23 0 E
800, 0 30 S 26 :_'0 E
...... ?00~~
o, o o.. o o o, o,Oo ojOo' ' -.46.oo o,oo o,oo o,oo o o o.oo
" ................ 100 ~ .......... O'-IS*"N"~8~--O-E------~O ~0~-----1-00~-, 00--~, ,--2~
./.00, 200,00 -0,12.' 154j00 0,12 S 0~60 E 0,62 S.78 30 E 0.25
100' 300o00 -0,02".:i: ,00 " 0,29 S 0,74 E O,SO S 68 30 E 0o25
1000, 0 0 0 0
:~--~'100'~ .........
1200, 0 0 0 0
1300. 0 0 0 0
-: ..... I'400',-': ....... 0'-15"'"'"~--40 ...... O"~E
':i.: 0,4? S. 0,83 E_ 0,96 $ 59 24 E 0,25
100t 6??,9? ??: :"~ : lt?l S 1,39 E 2,36 S 36 7 E 0,03
!00+ 799, 97 ' . .2t70 S :.' !t76 E 3t22 S 33 0 E 0,03
49
A PETROLANE COMPANY
1500.. 0 15 S 37 O'E 100, 1497,98 3,20!::~.~453t98'
1700. 0 0' 0 0 100, 1697e98 It31~ [6~t~ 4t90 ~
1800. 0 15 S 50 0 E 100, 1799,98 3*37- ~753t98 5,04' S
900'~--0-t5-S--44 ~E*~O0, 1697, ?~ -' ~ .5, ~
.
2000. 0 25 S 36 0 E [00, ~999,98 3,72 ~953,98
5,67 S
2100, ........... .0 ..... 0 ......... 0 ..... 0 .... 100-,"~2079,9~ --3r84 .2053~.98 5,-S§-S mm
2200° 0 15 N 68 0 W 100. 2199,98 3,84 2153,98 5.77 S
2300. 0 30 N 69 0 W 100, 2299,98 ' 3,85 2253,78 5.53 S '
2400,"--: 0--'30"'S-'45 -O-W .... ~00~ ....... 2399-~'97 -'4'~32 235:~,-97 ' 5,-70 ~
:" 2500, 0 45 S 22 0 W 100, ,2479.97 5,39 2453,97
.... 2600,~1---0---S--13--0-~ .... t00-,---2599-,-9-5-. ~0----2~§3r95 --
2700, I 0 S 9 0 W 100. 2699,94 8,61 2653,94
2800. 3 0 S 5 0 W 100, 2799.~7 11,97 2753,87
6,60 S
9,77 S
13,23 S
4'53 S 32 $ E 0,50
4,76 S 31 46 E 0.25
4.96 S 31 46 E 0.00
5T/'8---S--32----7--E
3,02 E 5,61 S 32 37 E 0,01
-3-rt6-E §.,-83--6-32-46-E~ -G,--25
3,16 E 5,83 S 32 46 E 0,00
3,32 E 6,04 S 33 23 E 0.25
~ ''.~ ' ~',~H--34--18-E O'~03
3,92
3,85
3,24
~,-43
6.90 S 34 39 E 0.03
7,1-1 S='34--42--E- .0-o~
6.93 S 33 43 E 0.25
6.40- S 30 22 E 0.25
~'rl, S ~. 5 [- 0.54-
1.83 E
1,04 E
0,62 E
6,85 S 15 31E 0,35
9,17 S "?
9,82 S 6 5 E 0,07
13,25 S 2 40 E 2,00
1~- ~,26.-
ARCO ALASKA, IMCo
·
D S"-I8 i--WEE'L--NO: ...... 3 .... G M S ....
PRUDHOE BAY~ NORTH SLOPE~ ALASKA
JOB-NOI--AO882G04~
COMPUTATION PAGE NO.
" T~HE .......... - D~rTE ...........
13~42126 13-SEP-G2
MEASURED DRIFT DRIFT COURSE VERTICAL VERTICAL~ SU~S£A R £ C T A N G U L A R C 'L 0 S U R E DOGLEG
'~'~"DEPTH ' ANGLE DIRECTION. LENGTH DEPTH SECTION TYD C 0 O R B I N A T E S DISTANCE DIRECTION SEVERIT'
....... FEET ............ D--'M'~-'D ..... H---:'-. 'FEET-:---FEET .... FEE-T- _,: ~ .' ~=~ ==c~ 9---H ' 9G/IOOF.'
3000. 10 0 S 7 0 W 100,
3200. 14 45 S 8 0 W 100, 7317~,61
3300, 17 45 S 6 0 W 100, 3289. ~'103
---:-3400~'.-.20-:-15-.-S---6 .....
500. 22 30 s".8 0 100,
36t
,09 · 38t66 S 2.78 W ' 38,76 S 4 7 W 1,78
~7,61 80,10 S Bt08 W . 80,51 S 5 45 W 3jO1
43.61 {07,87 S '.:. 11,48 W 108.48 S 6 5 g 3.05
3431,27:. 176,4.2 S" 17,'33 W .- 177,48 S 6 15 W 2,36
3700. 24 45'S 14 0 14 : 100. 3660.73
3800. 26 '45 S 14 0 W ~ 100, 3750,79
3900, 28't5-S--1:4
248~01:3614,93 '. ·::253,7? S . 35t82 W
:j,~704'~ 99 '295 t 74 S :. ,'": 46.33 ' W
A PETROLANE COMPANY
623,73 43!8,67 622,71 S
256,30 S 8 2 W
299.54 S 8 54 W
1,80
2.00
W ' 393,15 S ~0 7 W 0,50
W 44 ! ,--~ ::-- S- .~-0-32--W..- ...... 0+..00
W 489,36 S 10 53 W 0.25
W'.': 537,?7 S 11 10 14 0,25
14" 58&,-77 S-~24~-W~+00-
4500. 29 15 S 13 0 W 100, 4364,67 127,37 14 635.'.60 S 11 34 W 0.49
....... 4600 ~ ....... 29-....30-..S.-t. 4--'fO-Id I00, .... -4.4§1--,-.8t - 672T~6-::-440,5,81 :-----670~r41--G .' !'31ii,'8.~8~1-t--42--W-----0,55--
i,~ 4700. 29 15 S 13 0 14 100, 4538,95 720,59 4492,95 718.11 S' 150.27 14 733.66 S 11' 49 14 0.55
4800. 30 0 s 13 0 14 100. 4~25,88 76?,32 4577.e8 766.27 S 16~.39 W 783,08 S ~ 54 W 0.75
- 0~,' 3'1~-S I' .~. o.~ ~ ~ ~ I~ 8~W .3~... 0
5000. 29 45 S 13 0 W 100, 4798.31 869,21 4752.31 864.99 S 184.{8 14 884.38 S 12 I 14 1.25
.... 5100', ......... 30-1§-S-13 --O-W- 100.,-~-4884,92----9-18,~0:--4838*-~k2 ?~3~1 S .. 195~3 g '734~-38 S !2 ~-14----0~0
"=._ 5200, 30 15 S 13 0 W '100. 4971,30 968,16 4925,30 962,80 S 206,76 14 984,75 S 12 7 14 0.00
5300. 30 15 S 14 0 14 100. 5057,69 1017,90 5011.69 '1011.78 S 218.52 W 1035,11 S 12 11 14 0.50
..... .5400.- 30-45-~-S-16 O-W-. 100,~ 5143,-85, 1068.~0 509-7--,85 -1-0~0,-80'S- 231~&5---W---1OBS~80~-I2 1~ H , 1-.-13-
5500. 31 15 S 16 0 W 100. 5229.56 1119.36 5183.56 1110.31 S 245.85 14 1137.21 S 12 29 W 0.50
J .-1-70,-8. ..:~6., ......
::---5600, ....31---1'5'-S-'1& O'-W~ -t00. 531§'.0§ · o ,=: o ~.=:-_,~O~__~~.60~:,t~.~L__~:H~li~,_~9 ~ 12 38 u O+O0-
'J 5700. 31 45 S 16 0 W 100,' 5400.32 1222,78 5354.32 1210.41 S 274.55 14 1241.15 S 12 47 W 0,50
! 5800, 32 ' 0 S 17 0 W 100, 5485.24 '1275,27 '5439,24 '1261.04 S 289.55 14 1293.85 S 12 56 14 0,58
5900', -32--t5-0--1G ~O-W- l(H}. .... 5569'.93" 1328-,-25 -:=:~'~ o"z · -z· · '~-: -z~_~ -:a ,., · aaz_ o-~ c · 'z
·---,,~-r~- . ·.... - S 7 14-----0,§9-
ARCO ALASKA~ INC, ,. ~.. ' COHPUTATION PAGE NO, 3
DS"'IS~-WELL"'"NO** ........ 3 ........... GHS ................ 'dOB-NOI--AO882GO'458 - - ' T-~flE-----DA~E ......
PRUDHOE BAY~ NORTH SLOPE.~ RLRSKR 13~42t26 13-SEP-82
......... TRUE
HEASURE[t DR~FT DR]FT COURSE VERTiCaL ~ERT]C~L' ~U~SE~ R E C T ~ N ~ U L A R C L 0 ~ U R E DOSLEG
DEPTH ANGLE D]RECT]ON LENGTH DEPTH SECT[ON T~D C 0 0 R D I N R T E S D]STRNCE ~[RECT[ON SE~ER[T'
~"? .... FEET ............. D ...... H''''~' ..... D H
........... - ........ FEET-*~ FEET'-~FE'~ ...... '~'-PEET P~'T PEET ~~G/I'OOF'
,
6000. 32 45 S 18 0 ~ 100~ 5654~27 138!,80 5608,27 1362,~5 $ 322,14 ~ 1400,41 S 13 18 ~ 0,50
6200, 33 0 S 19 0 H 100, 5822,36 1489,~3.:; 5776~36 1465,48 S 356,98 ~ 1508,33 'S 13 41 ~ 0,25
[500, 33 15 S 19 0'~ !00, 6073,~2~:~654~ 6027~2:~,..~620,e6 $ ~.41~,~ ~--1672,28 - $ 14 15 ~ 0,60
6700e 33 15. S 19 0 N lOOt 6240,38.: 1763, : t75 619~t~8/..:'1724 54.~ ~44~t20 N 1781t58 $ 14 32 N 0.00
6800, 33 0 S Z9 0 ~ ~00, 6324.~3 tet8'2~'~;~.:6278.{3..:~776'21 s 464';e~ ~ 'i836.07 s ~4 40 ~ 0.25
7~oo 32-,j~ s ~o o ~ ~o~:'~ao.~,~':.~o~~ .l~eo.
* 8388 W 2052,05 S 15 8 W 0,59'
7300, 32 15 S 20 0 W : !O'~~~~~~~~~?W 2105,59 S 15 16 W 0,50
A ~'TRO~NE C~PANY
-7 ~ 00 ~ .......... 3 o-.. '4 s- s ..--.2 ! .......... o--~---~-0 0,~--7.0 e 0."~2.~.245-~2-~6 ~54~:.2~2.J..7 e-,-.4 e-s...-~.o ~'~.]--~--~2-.e · ...... ~i.~.~ e.-.- u .... o... ~ o
7700, ~0 0 S 21 0 ~ iOOf 70~J~ 22~5.6~ 7040,~ 2225,~ S ~27~4~ ~ 2312~44 ~ 1~ 45 ~ 0,75
7800, 2~ 30 S 21 0 ~ 100, 7!73J~1 2345,25 7127j41 2272j01 ~ 545,23 ~ 23~1,8~ ~ 15 51 ~ 0,50
8000, 28 15 S 20 0 W 100, 7348,43 2441,95 7302,43 2362,80 S 678,73 W 2458,35. S 16 2 W 0,75
.......... 8100, ....... 28 ..... 0-S--"20 ....0'-W-~t00-,--7436-,-63 2489-r03-~'7390-,-63 2407-,-~0-8----~94-~8~-~ 2§0§~38---S--1-6--6---14--0,-25
8200, 27 1~ S 20 0 14 100. 7525j23 2535,35 7479j23 2450,67 S 710,71N 2551,64 S 16 10 14 0.75
8300, 26 0 S 20 0 14 100, 7614,62 2560,12 7568,62 2492,78 S ~ 726,04 14 2596°36 S 16 14 14
'~8400. ..... 25--30"S:20 0-'14 100~-'-~704,-69 ~2623-,52---~658~69~2533~60-8 740.-90-W--2639-.~t-~S--l-&--/8-.-14 .... 0..50
1' 8500, 25 0 S 19 0 W 100. 7775,13 2666,1i 7749,13 2573,81 S 755,13 W '2682,30 S 16 21 W 0.66
{ ..... 8600 ,-'~24 --- O-S -t 9---' 0 ---14 ~---t 00-, .... 78 O 6,--'13--2707-,-4 9---F 840,4-3- . - ... &t3- 02--~8-,-63--W----2723~73~S--1~--24-14--- 1-.. O0
iJ 8700, 23 45 S 18 0 14 100, 7977,57 -2747,86 ' 7931,57 2651,40 S 781,48 W 2764,17 S 16 25 14 0,48
.j~' 8800, 23 0 S 20 0 W 100. 8069,36 2787,45 8023,36 2688,91 S 794.39 W 2803.80 S 16 28 W 1.09
~ ..... 8700-,-----23~0-- S--20 .... O-'-W----! O0 ~--8161 ,-42---282 6-,-48~81t5-,-. 42~2-~25 ,-63:- S-----80F-.-7-6--W---2842,80 ~S-t-6-30- W 0 · O0
,.
ARCO ALASKA, INC,
DS-18i ...... WELL-NO"~ ...... 3 ......... GMS ................. :v. ' o
PRUDHOE I~AY, NORTH SLOPEr ALASKA
COMPUTATION PAGE
dOB-NOt,AO882G0458 .................. T'I'ME .... DATE .......
13~42~2& 13-SEP-82
....... -TRUE-.
MEASURED DRIFT DRIFT COURSE VERTICAL VERTICAL BUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG
DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TUB C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITh
...... FEET ..... :--"'D .... M .......... D--H ......... FEET ..... FEE-T ..... FEET FEE-T ........ FEET FEE-T
VO00, 22 15 S 22 0 W 100, 8253,72 2864.?3 8207,72 2761,54 S 821o54 W 2881.15 S 16 34 W . 1,07
~! .... 9100~----22 ......O--S'--23'---O-W~..O(~--:-8~.4&r~5---290~2~O--~OO~5~-~-2.7~&~34-E~--~B3§,-9.&-W ...... ~9.t8-,.62.--S.~....6-3~--W 0.,.45
~200, 21 30 S 23 0 W' 100, 843~,24 2~3~,&5 83~3,24 2830,45 S B50,43 W 2~55,45 S l& 43 W 0,50
~300, 21 0 S 21 0 W 100, 8532,44 2~75,B~' 84B6,4~ 28&4,05 S 8&4,01 W 2~1,54 S l& 47 W 0,88
~400.,.?~t---..0...-S.-~t ......... 0-W-~100-, ........B&~5'~-~'~O1~-~.~~Bg~t--~76~5-~O27-,~8~-~~O-W
:.~-~ ~500, 1~ ~0 S 21 0 W 100, B71~&1 :.'304&,31 B&73,&1 2~2~,82 S B8~,2~ W 30&1,80 S l& 53 W 1,50
PROJECTED To'PBTD, ~
,
?622° 17 O' S 21 0 1,4
..PROJECTED...**TO-~TD.,~
~6e5. 1~ 0 S 21 0 w
A PETROLANE COMPANY
63, B894,46 3106.72 8B48,46 2986.24 S
W 3101,62 S 16 56 W 0o00
910,9'2 W 3122.08 S 16 58 W 0,00
- )
FINAL CLOSURE - DIRECTIONS S 16 BEGS 57 MINS 49 SECS W
D~STAN~E--t-
DS 18, WELL NO~ 3 GMS JOB NOt AO882G0458
PRUDHOE BAY, NORTH SLOPE~ ALASKA
..... GMS,~--,O..~SDO-HD,r-SURVE~ORt-PEFFERKOEN/H[t:EER----~ATE--RUN,t--!~?-flU6-82
CAMERA NOt 1644 GYRO NOt 632
5-?O~-~DEGo .... A/UNO~I t562
FORESIGHT{ S12 !SE
, !
'Eastman
A PE'TROLANE C_,C'~MPANY
(IRCO, ALASKA~ INCo. ' ' COHPUTATION PAGE NO. 1
DS'~"'18 ~'~':~ 14ELb-NO'I ...... 3-~:'' GHS ........................ JOB-NO'~-'AO882~0458 ................ ' .... ~'H~ DANTE
PRUDHOE ~AY~ NORTH SLOPE~ ALASKA 13148112 13-SEP-82
.
................ : ...................... HARK~R~ ............ -~ ....... -: .................... ~RU~ BU~BE'A
....... CODE ....... HEASURED VERTICAL HD-TVD VERTICAL R E C. T A N ~ U L A R C L'O S U R E VERTICAL
.'~; NRHE ....... DEPTH DEPTH -DIFF DEPTH 'C O O R D I N R T E S .DISTANCE DIRECTION THICKNESS
' FEET .... ~E'ET-~E~PEET "~.' PEET ' ' FEET D ~
,.
TOP SAG RIVER 8949.00 8206.64 742~4 8160,64 2743~23 S 814.5~ ~ 286~.60 S 16 32 ~
':--'TOP "- SHUBE'IK-~'R' ~8998T0 ~825~'-8 ~46~~05~'~~ 6~82-~82
TOP SHU~LZK ~ ~01~00 8271~"32 :~747~7 8225~32 27&B.15 S 824~28 H 2888.27 S l& 35 H
TOP SHU~L[K C ~034~00 8285~21 .748~'8 ,B23~,~21 2773.37 S' 82&~44 H 28~3.8~ S l& 3& H
· ~TO~'SADLEROCH ['T-~-"-' .... ~0.~,.00~8~09.,,i.-30~;~7,50,.f~26~L~..~~~~~'3~~9e3~-~~6~~
.ge ZONE 3 : 9205~00 8443,~07'761tl ;~.'~83~7t~0:2832,13 S 851,11 W 2~57,25 S 16 44 W
,.TOP ZONE lB ' . ~30'00: 8747,~3 ~':.~TB2f1'.':?~ '87~1.,~3'~'~"~"2~3~*05.S 8~2;80 W 3071,&7 S l& 54 W
PBTD 7622,0'
--TO ............................. 9685,0
Whipstoc
A FE"TROLANE COMPANY
3101.62 S 16 56 W
3122',08-"-S-1'6-58-'W'
F1EI,D
COUNTI~¥
!-'I~ ODIn(? IB I I., ] I' ¥
('1' &F~ EF: Z(INF8
/~TI.,ANTIC RICHFII,.'LD/ CO
DF~II.,[., 8]'1~1~ ~IR-~O
USA
68001~
I.,.ISTING)
CUMPAN ¥
: A'l'l.,aNq lC RIClqt'll<l,I) Clio
: 12t~11.,! SITE 1"~-.10
#
~ETP1C
· ~3iD-C J, METF;FS P~. DAY
PRUDUC lB I LJ 1"¥ F'LAG
TI :IIRV~I FLAG
DP CURVE FL~(
PEUF DEN. CURVE FL, AG
T1 PbOl'
V[](;~i, F..FECI' Fl.,AG
NtI~-I, AMI NAR. LANINAD Flit
SKIl, FACT{iR
JSTOP :
5I' : 1
GRADI : I
(VALUE)
2200.
00,00
.0009
.00000
.00000
.00000
.00000
99.250
.00000
0
0
.00000
885000
~00000
4.7000
00.00(
80.000
0
489,00
.50000
0
99,250
FT
FT
DFGF
PS IG
D E G F
F31B
FT
PPM
CUNI-'AI'4¥ : fiTbfiN'l~lC RICtiF IE:LD Ctl.
WEI. I. : I) RII..I SITE 1FI-lO
PAGIf
TJBlmG L)IA~F. TER !'.IT. 1'11!
'IUBING WEIGHT ']WT
CASING I)IAMElffR, INT. CDI
CASING ~ I~: 1Gti']l' C~T
SCREEN I)IAMETFIR. FXT. fSCRPE
SCREEN wEl Gttl .5C RtN T
GRAVEl. SIZE Gl~t$ IZ
3.95000 IN
-999.250 LP/F
-999.25¢, I N
-999.25( LB/F
-9q9.250
-§9§.250 LE/F'
-999.250
(MgiRIX PAHAb'IEI ERS )
I 2,0 4,0 B.0 12.O
2 2.0 4,0 8.0 12.0
3 2.0 4.0 8,0 12,0
4 2.0 4.0 8.0 I 2,0
5 2.0 4.() 8,0 12.0
(~f' NED PARA~!If. TPF~ )
BOTTOI~ FIUI.,I~] 'I'EI~PkPhTU~E BI-ti
TEtvtPLN A TiL.IR ~ TF 1~
FUIqMATION Pt~E$SURE
ABANDt)NMENT PF~E$8IIRE AP
PC.lINT PHI~j$StIRE BPP[aE8. I PR
V()h/)~E FACTOR, GAS P(;
F'[)I.(MATIUN VC)I,.F~C., OIL
FCiI~HA'I'I(~ VOb. FAC.., WAI'E t-~w
('~t A I,UF,
172. 0000
171 .6459
-999.2500
~ 71 o409B
-999.2500
171.2741
3q95,000
14.7000(
:' 3995,000
-999.250£
3995.000
-999,2500
3995,000
,0Or.. 2114
-999.2500
lj(~ 04,20B8
- 99 2500
,0042074
1.3374~18
-999.250C
i ,337432
-999 2500
1,]~7394
~. O '1 259t
-q99.250o
)FGF
DI;GF
P$IG
PSIG
PSIA
V/V
V/V
V/V
(LIMITS)
19~99,0 - 0
12145.0 - 12135,0
12135.0 12110,0
12110,0 11 2090,0
12090.0 120P, 2.0
12082.0 ']2072.0
12200,0 - 12000.0
99999.0 · 0
12145.0 - 12135.0
12135.0 ~12110,0
12110,0 12090,0
12090,0 12082,0
12082.0 12072,0
1; 1;z5,0 - 12135d(
12135.0 12110,0
1.2110.0 )1 2090.0
12090,0 l~0f12.0
12082,0 ,12072.0
12145,0 - 121t5.0
12135.0 ,12110.0
12110.0 12090.0
12090,0 12082.0
120H2.0 12072.0
1~1;45,0 - 12135.C
12135.0 12110.0
COHPAt~¥ : ~I'LbAI~I'IC RIC[iF IFI,I)
WEbL *. I)l~lhl, SITE 11~-10
COMPIqL$$1 t{ i LI'I ¥, C-..a, ,S
SPEC~, GI~AV IT¥, [;REF GAS SGF(;
SPEC, GRAVIT¥, i)1 SS, GAS
GAS V I,.,CUS ITY
OIL V ] s:(Js]'ry
WATEH VISCUSI
DENS 1TY
S 01.,. G A S - O 1 I., R/~ T 1, C!
(;V I5C. ] PR
~oV 15C. lP14
1,.012515
-999.2500
1.012469
-999. ~50C
.9452333
-999.2500
,9456121
¢E600000
-999.2500
.56~000(
-999.2500
.560000¢
.8000000
'999.250£
,O000000
-999.250f
,8000000
.OYlOE47 CP
-999.2500
,0210879
-999.2500
.0210897
,8a50000 3P
-999.250£
.~8500'00
-999.2500
.8050000
d~200000 CP
-999.2500
-999.~500
.3~000¢
· 7503523
-999.750C
.750~89]
-999.250(
.7504~05
: ,9~756~4
-999.2500
.9876395
-999,2500
,9~76845
680,0000
-999.250C
680.0000
-999.250f
V/V
G/C3
C./C]
F'3/B
1~110.0 )! 2090.0
120qO.O 12082.0
120R?.O ~?072.0
12145.0 - 121 35.0
12135.0 12110.0
12110.0 12090.0
I 2090.0 120fl2.0
120~2.0 12o72.0
I~ llZ5.o - 12135;{
12135.0 12110,0
1~110o0 ~?090o0
1 2090.0 1 2082.0
12082.0 ~12072.0
12145.0 - 12135.0
17135.0 12110.0
12110.0 12090,0
12090.0 ~1 ?OR2,0
12082,0 12072,0
15 l~t5.0 ' 12135.'(
1213-5,0 12110.0
12110,0 112090.0
12090.0 120fl2.0
12082.0 '12072,0
17145.0 ' 1.21~5,0
121~5,0 '12110,0
12110,0 12090,0
12090,0 120~2,0
1~082,0 12072,0
12135,0 12110,0
12110,0
12090,0 12082.0
12002.0 ~1 2012.0
12145,0 - 12135.0
12135,0 :12110,0
121!0,0 12n90.0
12090.0 ~'12082.0
12082,0 12072.0
12145°0 - 12135,0
12135.0 12110.0
12110.0 )12090.0
12090.0 12082.0
120~2.0 '12072.0
12145.0 ' 12135,0
121.35.0 :12110.0
12110,0 12090.0
12090.0 ~1 2082.0
C IJ 1~'~ P ikN ¥
',Vic !,1,
: A'lTI,Aiq'l lC I~ICt41- IEL) _~1;.
: Dt~!!,I_. $ITE lO-lO
PAGE
$OL.GA,5-wATEI,~ PA'[IO
POT. rl~t'.'l: GAS
AB,q. FL, I)W POT. $(1l.. GAS AI~PSG
AB.5, FbUN P{)3:ENT1Ab OIL AFFOI
ABS FI,OW POI'Ei'iTI~J~I~ WATEt~ /~FPWAT
HYDR()CARB(~N V~JI.,IJNF, ZONE HVZONF
TOTAL GAS RESEi~VEt.q 'IGFF;$
TOTAl, I}ll, RE,SERVF,q IOUIKS
DEV I/~T I. IIN Db V
DIP AN(;t.,L D]PANG
ZONE INDEX ZI NDE)~
(,80. 0000
(
-qq9.2500
0
-99q · 2-5 O0
£
.0192976 MF3D
-99q.250¢
,0976937
-999.7500
,0397]05
~q32464 NF3D
-'999.2500
.~t'7412(
-999.2500
.2722611
-q99.250¢
,0550176
-999,~500
.4003839
;( O; 3") 1 2 F f/D
'999.2500
.0097342
-999 , ~500
.0039544
:-999.2500 YT
-999.250~
-9q9.7500
-999.2500
-999,2500
!-999.2500 NF3A
-90g.2500
-999.250C
-999.2500
-999,250f
:-999.2500 BB/A
-999,250C
-99g,2500
-999,250f
-999.~500
36,30000 DE(;
1.000000
-g99.2500
2.000000
12082
17145
1213.5
12110
I ?000
1208Y
.0 I 2072.0
.0 - ~12135.0
.0 121!0.0
.0 12090.0
.0 1 20R7.0
.0 ,17072.0
12145.0 - 12.135.0
12135.0 1~110.0
12110.O 17090.0
120qo.o 120R2.0
12082.0 1 ~072.0
1; 1{~ '%.0 - 12135.'(
1~135.0 12110.0
!7110.0 )1 7090.0
12090.0
120~.?.0 ~1207~,0
12145.0 - 1.21 ~5.0
12135.0 ,17110.0
12110.0 120u0.0
12090.0 170~2.0
120R2.0 I ~072.0
I; I~Z 5.() - I 7135.'(
12135.0 12110.0
'12110.0 12090.0
I 2090.0 I 2082.0
1 2OR?. 0 ~1 207~, 0
12145
12135
12110
12090
120~2
1;145
121.35
12110
17000
120B2
12145
1.2135
12110
12090
120~?
.0 - 1 21 35.0
.0 '17110.0
.0 I 2090.0
.0 12082.0
.0 I 20'12.0
.0 - 1~135.C
.0 12110.0
.0 ,12090.0
.0 I 2082.0
,0 I1207~.0
.0 - 1213 .0
.0 ,12110.0
.0 12090.0
.0 ~1 20e2.0
.0 12o72,0
99999,0 - 0
99999,0 - 0
1 :, l.tZ. 5.0 - 12.135;(
12135.0 12110.0
12110.0 12090.0
Ct]I4PAN~' : A'II,,~N'II¢ I~]Ctti'.ll'.I,I.) CI.Io
-gggo2SO0
~. 000000
12090.0
120B2.0
170f12oO
12072.0
C05(PANY ; ATL, A~tliC .RICF:~ JRL3~ ZU.
ZONE
PSIG R~ I
,{964.5
3944.5
i]934.5
3924,5
391.4,5
3904.5
~.~! l,
BB/T)
~ 0 l, E S ti t~ F
$0 l,
GAS ~ ~q'{P UI l, G~S
KF3D B[.~/i) PB/D ~ F3[)
30.5
23,0
10,0
? 5 4
1 !
3 3 2
TOTAl, 9
40.5
33,0
2O .0
10 ? 5
I 1 1
7 's 4
12
50.5
30,0
12 9 6
I 1 1
10 R 5
16
60.5
53,0
40,0
14 !1 7
2 1
14 10 7
3
mmmmmmmmmmmmmm
19
70.5 I 7 I 3 9
6{,0 2 2 1
50.0 17 13 9
;
'i'~ U'J' A L ,~ 7
1
3
~3
80.5 19 14 10
73.0 2 2 1
60.0 21 16 1 1
T (.'.{1' ~ L, 32
27
90,5 22 1~ I 1
83.0 3 2
70.0 24 11~ 1 2
H B / l)
COI~PAN¥' : A'II.,ANIIC I~ICH~ ILI,D
~E[,b : IIRILI. SI'rE 1~-10
PA ¢;E
PS 1 G 76 t
~8~4.5
]874°5
3'774.5
]67 ~. 5
]574.5
]47~,5
1 0(~ .5 74 1
110.5 20 2
103.0 3
90.0 31 ?
220.5 52
213.0 7
200.0 ~8 5
320.5 75 5
313.0 10 1
30.0.0 101 7
420,5 93 72
41.3,0 13 I 10
400,0 133 100
1 13'1'~A t: I 8 2
52C,5 118 ~ 88
I1 ~ F
51J I.,
CAS
gF3D
FRF:E
GAE
KF'3D
17
2
14
2
15
2
1R
26
4
'35
38
5
51
49
7
31
39
43
4
10
2
81.
6
15
3
118
8
19
4
154
10
CIJM'PAI't¥ I A'il,~NIi£ rlUHl: IL. LD CO.
FACE IOtt~ t~
P~ES
PS I G P~ i
3174.5
tl 74.5
3(.)7 4.5
29'14,5
1 q '14:. 5
513.0
500,0
O] I, (.;AS WATI;, P (ill CAS GAS
t~,B / I'1 g.l'!5 l') Bi:./D PR/l)
173 84 5
I~: A '1 E I~
BR/D
620.5
bO0,0
139 I 104 71 11
195 146 99 5
720.5 160 ! 170
71].0 22 2 16
700,0 275 lhe
TOTAL t04
I~1 13
1 I 32
114 ~
258
820,5 !~0 I 135 91 15
81,3,0 75 2 18 I 2 36
800,0 254 190 129 7
1ruTAI,
43 291
92¢ ,5 199 I 149 I Ol I 6
913,0 27 2 20 14 40
900.0 283 I 211 144
TI)T ~1,, 3~1
1020.5 218 1 163 111 18
.101 ~.0 30 3 22 15 43
1000,0 310 I 232 15~ I~
10 T A L 41 7 35 3
2020.5 378 2 283 192 30
2013.0 52 5 39 28 '14
2000,0 54.7 I 406 276 14
727 61 3
,1
2
,1
I ATLAh']' IC R ICtit,
: DP.II.,I_. SITE
PAGE
SANI.) I) ~ A ~,'-,
PS 1G P,~i I
974,5
I:~ I I, GAS ~ A'F [.: I,~ O 1 I,
B [~. ! i) K F 3 I.,' t.~. ~ ! I_', l-s B / D
3020 .b
30! 3.0
3000. o
4B4 3 36
6 b '1 5
697 2 52
3'J95.0 535 4
]987.5 '/4 10
]974.5 773 2
$ IS R Ir
8OI.
A C
GAS
WAT[~F
H H /
246 37 3
34 92 7
355 1R ~
1¸2
400 272 40 4
55 37 98 10
578 393 19 2
4 863 16
# $CHI.U~BF:RGEN ·
(4 2,()NF.$~ SF~F; BEi(;,II'iNING
:FI"II~ l.,18,11!l'~6 I'lF' TFlal. F
COMPANY : A'I'LANTIC T~ICHF'IE'ILI)
~FL, t, : i')~IUI., $Iq,~ ~IB-IO
F'] E;I,.:D I PliIJDUOF.
COtlNTi~ Y ! Il,SA
b,I STI FIG
(') I,t I,, Y )
~( 01~ PANY
W FI.,I.,
:F 1)1; LD
C '] tl Y T P Y
(4
~ SCt4LI.I~BEPGE H
PRUDUC]IBI [,].TY
ZONES, SEE BEGINI~ING OF' I..,ISTIbG
I.,1STING iIF" I'HF~F:F ZI"iINES I')NI,¥)
A'I'b~NT.B( RICHP'IBL, E ~(f'l.
l)lt]'I,l~ 8I.?E 10-10
USA
68004
COMPAN¥
~El_,b
:AII, Is. NIIC IqlCt~l-lE.I,D CO.
I [RIL, L SITE fl-lO
#
# # .1(. * M .X. # -I~
· #
KI..tD - '! Hi I..ISANI) Cfi. FT. l.-'t'FP I)I Y
, vlJ/D -. C J. HI.£'rF:P$ ?t.:.R DAY
a. I~M3D - 'I"HfIUEar, iD CII. METI;F~ PER
( G L,I'.i[4 A I., P AR AMIg'1'F.R$)
JOB STAI~T
T glv~ p E;R A'I'U I~ g GRADIt; NT
PRUDI.,~C IISI L, I'I'Y FLAG
7] :I.IRV~t r{,AG
DP CURVE
PEIf~' D~:N. CURVE: Fl:AG
TI P l,.,l') ~[
V(.iG *,L i~: rF'EC r
I~[JI~-t.,,AMINAR~ I.,AI',.'Iir~AH I/Ut
Sg I ~t~ I.'ACTI. iR
PVT INEICA'FO~
,SPE2:o GRAVi'I.'Y,
,SPEC.. GRAVIT.~ ·PHJJi. I,GAS
PRESSURE, PEt')D, (;AS
TKMPER ATI.!i~ E, p la LiD. (.;AS
PR(ID.GAfi,,-LIIL RATILI
VOL, ATILg Oil., OPT
I) l~hlNa(:;g RADIt) 5
BO RE H(')I.,t~ glAlV
l'O'[ ~, L D [ 5 8 U b :V I/: D S (.) L I
P 1F E'; H(.
ST
Gi~ADI
( V A I_,UF )
12200.0
0
100.000
1.00030
[ l PI~I?'[ c I I ,00000
'!" 1 I:,' L,G : 1 .OO000
L El- E( I 1. 00000
P~}{ ?L ~; I 2.0000(')
'[1PLT : -999.250
V 3I,FL¢; ; 1. 00000
SKNFAC : 0
3.00000
.885000
.~00000
14.7000
10(},00£
660.000
0
1.489.00
8.5n000
0
-g99.250
FI'
FT
t)EGF
DFItF
P$1(;
DKGF
F3/B
FT
CIIMPAI4¥' : AI'LANTIC RI(:F~f IEI.,D
NELl, : I)I~]LI. ',E ITt;: In-lO
I? A C,F.
TUBING t)lg~lkTi~:P INT. Ti) l
I U[tl NG nF' I GH'I
C/~Slqg DIANETFi~, INT. CDI
C A,S 11'~' G wE I. GI4I C~t
$CPEEN l)IA~ll<TFi~s FIT.
GPAVEI, SIZE (;~VBIZ
! ].95000 IN
· . -999.250 LPtl.
: -999.250 IN
: -999.25£ LB/F
J -999,250 IN
J -99~ .250
J -9.~9. 250
( M}'LRIX PAI~ AI~ Eq fi(8)
I 2.0 4.0 8.0 12.0
2 2.0 4.0 8.0 12.0
3 2.0 4.0 8.0 12.0
4 2.0 4,0 8,0 12,0
5 2.0 4.0 8.0 12,0
(Or NED PARAMETERS)
B(JTI'(]tM HUI,E TEI~PF..'.RAI'tIRE
FLIHMAI'.ItF)N PHESSU.RI< F P
ABAND(.1NMI~':NT PHI' S.SI.)Rt~; AP
t3 U B H L, g P t'] 1 N T P R E $,,q. U R [';
FORM. V~,ll,Ut~E [;AC'I,(J)R. GAS E~G
}ORt4AI'I(.~N VfJI~.["AC. , OIL
L~PPRES. IPR :
Pit :
172.0000 )EGF
171,6459 DtGF"
-g99,2500
171..4098
-999,2500
171.2741
-999,2500
170.9820
3995,0)0 PSIG
1.4.70000 P$1G
3995.0)0 P$IA
-999,250C
3995,000
-999,250C
3995,000
-99g.2500
3'995,000
.00~2114 V/V
-ggg,2500
.~042088
-999.2500
.0042074
-999,2500
.0042043
1.3:37498 V/V
(I.,IMITS)
~9999.0
12145.0
1 2135.0
12110,0
12090.0
12082,0
12072.0
12035,0
1220D.) -
gt999.0 -
12145.3
12135.0
I 2110.0
12090.0
12082.0
12072.0
12035.0
1,5 1J~ 5.0
12135.0
1211.0,0
12090.0
12082.0
12072.0
J2035,0
12145.0
0
12135.0
12110.0
11 2090.0
12082.0
,l 2072.0
1 2035,0
J 2020,0
12000.0
0
1~135.0
,12110.0
12090.0
~120~2,0
12072.0
12035.0
12020.0
12.1. 35 ;(
12110.0
Il 2090.0
12O82°O
~1 20'12.0
12035.0
12020.0
12135.0
COMPANY' '. Al'LAN'[lC HICtiFIEI.;D C'O.
[~ELL : DRII.,I. 51TE IP-IO
F{II~MAI'II)N Vi)L.I-AC., wATL F-N
COMPI~ES,S1B I 1,11 Y, 6AS
ZGAS. I
SPEC.(;RAVITY~Ft~Eb~ GAS ~(.-["6
SPE ~1, [;N ~,IV i. 1 Y, lJ I SS. G ~$
GAS V 1,SC081T¥
OIL VlSCOS.II'Y
~AI'EI,{ VISCt,),,SII'¥
(;VISC.IPP
£;VlSC,,IPP
~VlSC,]PE
-999.2500
1.337432
-999.~50(
1.337394
-999.250C
1.337312
-999 2500
-999,2500 1.017469
-999.?5O0
1.012370
,9¢59443
-999.250C
,g457333
-999.2500
,9456121
-999,250C
,9453511
.5600000
-999.2500
,56C000(
-999,2500
,560000C
-999.2500
.5600000
,8000000
-999,~50C
.8000000
'999,2500
,8000007
-999,25(.)C
,8000000
: .'£~1()84~ CP
-999.2500
.0210879
-999.250()
,0710897
-999.2500
,0210937
8~50000 CP
1-~99.250C
.8850000
-999.250£
,8~50000
-999.2500
,8~50000
: 2~?00000 CP
V/V
V/V
! 21 ')5.o
1211o.0
I 2()9o. 0
12082.0
12072.0
120)5.o
1214_5.0
121 t5.0
12110,0
12090. o
1 2¢)~ ?. 0
I 2072,o
17035,n
12145.0
121 35,0
12110.0
I 2090. C,
12082,0
12072.0
12035.0
12145.0
12135.0
!21lO.O
12090.0
1201~?.0
12072,0
1 2035.0
12145.0
1213S.0
12llO.O
1 2090.0
120{~2,0
12072.0
I 2O35.0
12 1;45.0
12135.0
I 2110,0
12090.0
1.2..082,0
12072,0
12035.0
12145.0
121 35.0
1'2110.0
12090.0
12082.0
12072.0
12035.0
12 1{ 4 S. 0
12110.0
I 2090,0
)1 20~2,0
1 2072,0
12035.0
12020,0
1 21 35.o
12110.0
I 20q0.0
I 20~.2.0
~1 2072.0
1 2035.o
12020.0
121
12110.0
] 2090.0
120~2.0
12072.0
-120~5,0
I 2020.0
121 35.0
12110.0
)1 2090. (}
1 2082.O
'12072.0
12035.0
12020.0
121 ~5,()
'12110,0
120'90,0
12082.0
12O72.0
~1 2035.0
12o?0.n
12135.(
12110.0
I 2090.0
12002.0
)120'12.0
12020.0
121 35.0
'12110.0
I 2090.0
)12082.0
12072,0
12035.0
12020.0
12135;(
COM['~N¥' : ATI,AI~7 lC RICI-iI, IEl..)
~[~I,L : I.)PII,I ,SI'I'R 1~-1o
$OL.(;AS-wATEH RA'IIO
PUT. F't~,E GAf ~FPFG
AI:~$. [.;" [., (') i~ PO'!. SCI., G/~& Ai;'P,SG
-qgq.2500 .3YCO00~
-999.2500
-999.7500
.32()()000
.75035~3
-999.250£
.75o3893
-999.250¢
75~4105
-~99 250(:
.7504567
.Sfl55~14
-999,2500
.9~76395
-999.2500
.9~76845
-999°2500
,9977810
680.0000
-,999,250~
6~0.0000
-999,250£
680,0000
-999. 250C
680,0000
0
-999.2500
0
-99q.2500
-999,2500
: .0192965 -~9q 2500
-~99 250C
03~7299
-~99 250e
: .3929111
-~99 250O
-999.2500 .272038~
-999,2500
(;lC 3
F 3lb
~!F' 3D
I 2135 .()
1211n.()
1 2090.0
120~2.0
12072.0
1 201.15.o
12145.3
{7135.0
12110.0
I 2090,0
12082.0
12077.0
12035.0
1.~ l~z 5.0
12135.0
1211o.o
12090.0
,1 20~2,0
12072,0
1203'5.,0
12145.(.)
12135,0
1211o.0
12090,0
120R2.0
12072.0
12035,0
12145.0
12135.0
12110.0
12090.0
12082.0
12072.0
12035.0
12145.0
12135.0
12110.0
12090.0
12082.0
12072.0
12035.0
12145.0
121,t5.0
12110,0
I 7090,0
12082.0
12072.0
1
)1
1
'1
1
1
1
'1
1
1
1
1
1
1
)1
1
'l
1
1
1
1
1
)1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
!
1
21 10.
7090
2077
2035
2O20
21 ~J5,0
21 IO,O
20o. 0.0
20~2.0
2072,0
20 35.0
2020.0
21 35 i(
2110,0
2090.0
2.082.0
20 '12.0
2035.0
2O20,0
2135.0
2110.0
2090.0
2082.0
2072.0
20 35.0
2020.0
2135.0
2110,0
2090.0
20~2.0
2072 0
2035:0
2070,0
2135.0
2110,0
2090.0
2082.0
2072.0
2035.0
2020.0
2135.0
21~10,0
2090,0
2082.0
20"/2.0
2035.0
COHPANY' I A'II, AN'I!C RI£t.[- i['bD CO.
wEI,L : I}t~ll.L 81Ti', 1H-10
ABG. Fl.,i)~ P:,}T:'_;N'IJAI.
BBS FLOw PCTEN.1'IAI_ wt'Pt-H
HYDI~UCARH{)N VI]I..,I.INE, ZtlNE
TO?Ab GAS
TO?Al., ()Il, RE6ERVF5
l) E t ] A 't' I n N
l)IP ANGI,E
'lC
Z.,]NE I NI)I~ X
,'I GI~ E: b'
q 0 P,, F, ~
i) I~.: V
l) 1 ['AN(.;
7.i} NDEX
1.27q952
.5778104
-999.250f
,0549719
-999. 250¢)
-999,250£
1.882282
.0023816
-999.2500
,0096949
-999,2500
,0039Jt~5
,,.,999.2500
.0023308
I,,H/C
t-999.25)0 FT
-999.250~
-999,2500
-99q.250¢
-q99.~500
-999.2500
-999.2500
:-999,2500 NF3A
-999.2500
-999,250£
-990,2500
-999.250(
-999,2500
-999.250C
:-999.2500 BB/A
-999.250£
-999,2500
-999.250(
-999.2500
-999.250C
-99g.25DO
36. 30000
0
I 020000
2,00000£
-999,2500
3 0~000(
-959 soo
4.0000o0
120.~s.0
12145.0
12135.0
12110.0
12090.o
120H2.0
12072.0
12035,0
12145.0
12135.0
17110.o
12090,0
12082.0
12072,0
12035,0
12145,)
12135.0
{ 2110.0
12090.0
1 ?082.0
1 20'12.0
I 2035.0
1~1,45.0
12.135.0
12110.0
1. 209(). 0
12082.0
I 2072.()
12035.0
12145,.0
12135.0
12110.0
12090.0
12002.0
lY. 072.0
12035.0
1 2020.0
17135.0
,12110.0
1 2090.0
120~2,0
12072.o
120.t5.0
12020.0
12135.0
12110.0
)i 2090.0
1 2()tn 2. o
,1 2072.0
12035,0
12070.0
12135.0
'12110.0
1 2090,0
~1 20N2.0
I 2072,0
12035,0
1 2020.0
121.35.C
12110.0
;!2090.0
12082.0
~12072.0
12035.0
12020.0
I 21 35.0
,1 2110.0
I 2090.0
~120~2.0
12072,0
12035.0
I ~.()20.0
99999.0 ,- 0
99999.0 - 0
12145,0
12135,0
1211.0,0
12090.0
12082.0
12072,0
12035,0
- 12135.0
12110.0
)12090.0
12082.0
,12072.0
12035,0
12020,0
WEI.,I, : [RII,L SITE ?1;-10
Z O ~ E
PSIG
394~.4
~928.a
]918.4
3g08, ~t
I') 0
(~ I I,
~ N
fl L
NAI'EF
i~ B / 1)
Ol I,
10.0
S3
7
3
5~.~
40.5
33.0
20.0
64
10
1
7
50.5
43.0
75
1
60.5 14 1
5].0 2
40.0 14 I
8e.6 97 7
70.5 17 1
6].0 2
50.0 17
96.6
80.5
7 ~.0
6O. 0
19
21
] 9
5
l
o~
1'0 T A I,
el
14
!6
113
FREI':
GAS
gF 31)
4
32
5
1
4
38
1
5
44
7
7
49
9
1
10
1
11
]5
45
61,
84
BB./I)
3868,4
['J 1 I, GAE ~,,AT F'I-, I( I I, (;AS
BB/I) KF'3[) lah/D BP/r:. F F' 3 I_'., g F' 31'~
106
90
~ 3
70
10(~ .5 24 1R I ? 2
93,0 3 2 ? 5
taO.O 28 21 14
TO'l' ~t, 13~
126.6 1,42 106 72 1
110.% 26 20 13 2
103o0 3 3 2 5
90.0 31 23 16 1
Ti!ITel, 151 112
136.6 !53 114 78 2
120.5 29 21 15 2
113o0 4 3 2. 5
1 O0 .(j 34 26 ] 8 ]
I'OThL 164 122
236.~ 2(>1 '195 133 3
220.5 52 39 26 4
213.0 7 I 5 4 10
200.0 6~ 5! ~5 2
TI),rAI, 290 216
336.6 367 275 ! 8'7 4
320.5 75 56 38 6
~13.0 10 I 7 5 15
.~00,0 10 I 76 5 I 3
CUI~PAH¥' ~ Al'l,hk'i'l¢ I~1¢ttI'!i:1,1"1
w~IIJI, : Llt-/II, I. S.ITE 18-10
S A N I', D R A I~
PI~E$ PRI*S
f) I', iN N FI I-} I. F'
I.}I 1, (';/~,'5 W ~,'l' :'P ill I,
[~. f; / l) I( F 3L; BP. / l) Fi t~. / f,
A C
GAS
.3258.
10'!'~l, 414
43~ob
420.5
41:3.0
400.0
471
97
13~
10
oo
34
536.e 572 42H
520.5 lln I RR
513.0 16 I 12
500.0 165 12]
TO'T~I, 652
630,6 671 502
§20,5 139 I 104
613,0 19 2 14
600°0 195 146
766
736.6 767 573
'120,5 160 1 120
713.0 22 2 16
700.0 225 168
83b,6 86! 64
820,5 1~0 1 13
813.0 25 2 1
800°0 254 19
952 I 71
199 1 14
936,6
920.5
240
6H
291
6~
8
H4
341
71
! 0
99
390
11
114
12
!29
4R4
101
5
8
19
4
399
10
24
5
%8 1~
7
I1
5
572
13
32
6
~5½'
9
15
36
7
7 37
10
16
,1
1
C(}h~PAti¥ : A:ILbN'IIC EICbF l[;l:D
PA
$ A N l) i) P, A k
F'AOf DU~N
P R I,_ t.; PRE $
PSI(; P,~ I
195S.4
[* I !., GAS I~ ~rl' ri< [; 1 I,
P [3/!~ I,, 1" 3 I) fie / b ~. Is / D
913.0 77 7
900 .O 2I~3 1
'1 f)l' ~,1 1
I 0 ~lh,6 104O 1
102G,5 2lb 1
! 01 .3. o 30 3
1000 .(3 )10 I
l'{')'itt I, I
P F /~ C I,:
,'-; [1 I,, :1-
I<: F 3D KF'3D
t~fl ID
20 I 4 40 2
2:11 144 ~
778 52q 11 !
16) 111 18 )
22 15 43 2
2)2 158 R '1
195 893
2036.6 1'186 1 1]36 908 i,~ 1
2020.5 378 2 283 192 30 2
201'],(.~ 52 5 39 26 74 5
2000.0 542 1 406 276 14 '1
303b,6 2281 2 1.705 11 60 22
]020,5 484 3 362 246 37
30 13.0 6b 7 50 34 92
.)000. () 697 2 52 1 355 18
TO'I' ~,L 263 g 1963
3995.0 2517 2 1882 12~0 23
3978.9 535 4 400 272 40
]97!,4 74 10 55 37 98
]958,4 773 ? 578 ]93. 1.9
1:0. A'I, 2
915 2162
2
3
7
1.4
2
4
10
2
18
i
Suggested form to be inserted in each "Active" well folder to check
for %imely compliance wihh our regulations.
Ope. ratO~ ~611 ~ame and ~umber .
Reports and Materials to be received,by:
Required Date Received Remarks
COmp l etio n Report Yes /
We11 History Yes /
· _
....
Core ~scription
~'Registerea ~ey 5a~
Inclination Su~ey ~~
Dire~ional ~ey ~ - F/
Drill St~ Test Rem=s ~~ ~~
Pr~u~ion T~t Re~rts .
Post Office Box 360
Anchorage., ~ka 99510
Telephone ~0~77 5637
September 21, 1982
Reference: Arco Cased Hole Final
D.S. 18-3 8-16-82 CBL/VD
Run 1 5"
e sign and return the ~ttached copy as receipt of data.
Kelly McFarland
AFA-403
Trans. # 481
DISTRIBUTION
NORTH GEOLOGY
R&D
EXXON
MOBIL
DRILLING
GETTY
PHILLIPS
D&M
SOHIO
GEOLOGY
MARATHON
CHEVRON
'~STATE OF ALASKA
DALLAS
Post Office Box 360
Anchorage. /" ~ka 99510
Telephone 9k,..277 5637
September 14,
Reference:
1982
ARCO Open Hole Finals
D.S. 18-3
D.S. 18-3
D.S. 18-3
D.S. 18-3
D.S. 18-3
D.S. 2-23
D.S. 2-23
D.S. 2-23
D.S. 2-23
D.S. 2-23
D.S. 2-23
8-9/13-82 DIL/SFL Run 1/2 2"
8-13-82 BHCS Run 2 2"
8-13-82 CPL/Cyberlook Run 2 5"
8-13-82 BHCS Run 2 5"
8-9/13-8~.~, ~''' FDC Run 1/2 5"
8-9/13-82 FDC/CNL Run 1/2 5"
8-16-82 CPL/Cyberlook Run 1 5"
8-16-82 BHCS Run 1 2"
8-16-82 DIL/SFL Run 1 2"
8-16-82 FDC/CNL/GR Run 1 5"
(Raw)
8-16-82 FDC/CNL/GR Run 1 5"
(Porosity)
'8-16-82 Caliper ProfileRun 1 5"
& 5"
5"
Please
sign and return the attached copy as receipt of data.
Becky Benedict
AFA- 403
Trans. %462
DISTRIBUTION
NORTH GEOLOGY EXXON
R&D MOBIL
DRILLING GETTY
PHILLIPS D&M
SOHIO GEOLOGY
MARATHON :STATE .OF
CHEVRON DALLAS
· :
AR'CO Alaska, Inc.
Post Office Bo~,,,,.,,~0
Anchorage, Alaska 99510
Telephone 907 277 5637
September 10, 1982
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commi s s i on
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: State Reports
Dear Mr. Chatterton:
Enclosed are monthly reports for August on these drill sites:-
1-19. 13-32 1E-30
2-23 13-34 1G-1
2-26 14-21 1G-2
6-19 mi~ 1F-5
6-20 18-6 WSW-2
6-21 1E-17
Also enclosed is a Well completion report for Kuparuk 1E-16.
Surveys for 2.22 and 6-18 are 'being reran; completion reports for
these wells will be submitted when approved surveys are received.
Sincerely,
P. A. VanDusen
District Drilling Engineer
PAV/JG: 1 lm
Enclosures
GRU1/L93
Alaska Oil &~nchorageGas COns. CommiSsion
ARCO Alaska, Inc. is a subsidiary of AllanticRichfieldCompany
· ~ STATE OF ALASKA .~
ALASKA' ~AND GAS CONSERVATION C~ ~ISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well
Workover operation []
2. Name of operator
ARCO Alaska, Inc.
3. Address
P. O. Box 360, Anchorage,
4. Location of Well
at surface
AK 99510
1184' FNL, 161' FEL, Sec. 24, TllN, R14E, UM
5. Elevation in feet (indicate KB, DF, etc.)
46' RKB
6. Lease Designation and Serial No.
ADL 28307
7. Permit No.
82 -109
8. APl Number
50- 029-20776
9, Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
DS 18-3
11, Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
For the Month of. August ,19 82
.12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well @ 0600 hrs, 07/30/82. Drld 17-1/2" hole to 2620'; ran, cmtd & tstd 13-3/8"
csg. Drld 12-1/4" hole to 8850'; ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 9685'
TD; ran open hole logs; ran, cmtd & tstd 7" liner. Disp well to NaC1. Ran CBL. Ran
4-1/2" completion assembly. Secured well & released rig @ 1900 hrs, 08/16/82.
See Drilling History
13. Casing or liner run and quantities of cement, results of pressure tests
20", 91.5#/ft, H-40, weld conductor set @ 80'. Installed w/2940 # Poleset.
13-3/8", 72.0#/ft, L-80,BTC Csg w/shoe @ 2600'. Cmtd w/2400 sx Fondu '& 400 sx Permafrost C
9-5/8", 47.0#/ft, L-80/S00-95,BTC csg w/shoe @ 8918'. Cmtd w/500 sx Class G.
7", 29.0#/ft, L-80, BTC liner f/8587'-9665'. Qntd w/340 sx Class G.
See Drilling History
14. Coring resume and brief description
None
15. Logs run and depth where run
DIL/SP/BHCS/6R f/9681'-8900'
FDC/CN~/GR/Cal f/9677'-8900'
CNL/GR f/9677' ~8500'
CBL f/9614 ' - 8471 '
.,1 6. DST data, perforating data, shows of H2S, miscellaneous data
N/A
SEP 1 4 1982
Gas Cons. Commissiorl
,%richora.q9
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~~~ Area Drilling Engineer
SIGNED TITLE
DATE
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
DS 18-3
DRILLING HISTORY
NU 20" Hydril & diverter. Spudded well @ 0600 hrs, 07/30/82. Drld 17-1/2"
hole to 2620'. Ran 67 jts 13-3/8" 72#/ft, L-80, BTC csg w/shoe @ 2600'.
Cmtd 13-3/8" csg w/2400 sx Fondu & 400 sx Permafrost C. ND 20" Hydril &
diverter. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd
to 5000 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10'
new form. Tstd form to 12.5 ppg EMW - ok. Drld 12-1/4" hole to 7623'. Mud
wt in 10.3 ppg, out 9.8 ppg (gas cut). Well flowing - no pit gain. Shut
well in for 30 min. build up. Bled off pressure. Attempted to drill ahead
while weighting up to 10.5 ppg. Vented gas thru degasser. Cont circ while
wtg up to 10.8 ppg to stop gas cut. Continued drlg 12-1/4" hole to 8850'.
Ran DIL/SP/GR/FDC/CNL f/8600'-2600'. Reamed 8590'-8850'. Drld to 8925'.
Ran 225 jts 9-5/8" 47#/ft, L-80/SO0-95, BTC csg w/shoe @ 8918'. Cmtd 9-5/8"
csg w/500 sx Class G. Instld 9-5/8" packoff & tstd to 5000 psi - ok. Tstd
csg to 3000 psi - ok. Drld FC & cmt. Drld FS & 2' new form. Tstd form to
12.5 ppg EMW - ok. Drld 8-1/2" hole to 9685' TD (08/12/82). Ran
DIL/SP/BHCS/GR f/9681'-8900', FDC/CNL/GR/Cal f/9677'-8900' cont w/CNL/GR to
8500'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 bbls H20, 300 sx
Permafrost C, 131 bbls Arctic Pack.. Ran 26 jts 7" 29#/ft, L-80, BTC liner
f/~8587'-9665'..Cmtd 7" lnr w/340 sx Class G. Drld cmt to 9622' PBTD. Tstd
lnr lap to 3000 psi - ok. Displaced well to NaC1. Ran CBL f/9614'-8471'.
Ran 4-1/2" completion assy w/tail @ 8640' & pkr @ 8530'. Tstd tbg hanger &
packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok.
Nipple for SSSV @~2223'. Secured well & released rig @ 1900 hrs, 08/16/82.
JG:llm
09/01/82
GRU/DH37
RECEIVED
SEP 1 4 1, 82
Oil & Gas Cons. CoilqmJ$$JOll
,.'~nchorage
Telephone 907 277 5637
August 24, 1982
.Reference: Arco Magnetic tapes
, .'.' ..D.S. 13-24 5-16-82
D.S. 13-25 7-2-82.
DG SWF field tapes
DG SWF field tapes
DG SWF field tapes
ACC 65407
ACC 65410
ACC 65411
D.S. 2-23 8-16-82 ACC 65465
D.S.Ji%8-3 ~' 8-13-82 ACC 65454
D.S. 14-22 6-6-82 ACC 65170
OH tape and listing
OH tape and listing
OH tape and listing
Please sign and return the attached copy. as receipt of data.
Kelly McFarland
Trans. # 417
Run~'l~
Run 11
Run 1 ~
Run l&2
Run 1
DISTRIBUTION
NORTH GEOLOGY
R&D
DRILLING
PHILLIPS'
SOHIO
MARATHON
CHEVRON
EXXON
MOBIL
GETTY
D&M
GEOLOGY
STATE' OF ALASKA
DALLAS
ARCO Alaska, Inc.
Post Office Bc '60
Anchorege. A~a 99510
Telephone 907 277 5637
August 24, 1982
Reference: A=co Directional Surveys
D.S. 2-26 7-13-82
D.S. 6-19 7-27-82
D.S. ~-8-~3 ~ 7-30-82
Single Shot
Single Shot
Single Shot
EW
EW
EW
Please sign and return the attached copy as receipt of data.
·
Kelly McFarland ·
Trans. #408
DISTRIBUTION
NORTH GEOLOGY ~ .-
R&D
DRILLING
PHILLIPS
SOHIO ,~
MARATHON
CHEVRON
EXXON'
MOBIL
GETTY
D&M
GEOLOGY
STATE OF ALASKA
~Jaska Oil &
Anchorage
ARCO Alas.ka, Inc.
Post Office
Anchorage, Al~a 99510
Telephone 907 277 5637
August 9, 1982
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas. Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT' State Reports
..
Dear Mr. Chatterton'
Enclosed are monthly reports for July on these drill sites'
2-25 13-25
2-26 13-30 1.E-15
6-17 13-33 1H-3
6-18 14-21 1H-4
6-19 18-2
Also enclosed are three subsequent sundry reports for Kuparuk
1H-5 and completion reports for-
13-21 15-1~'
13-24 18-1
13-26 1E-14
14-17 1H-5
14-22
/.5'-_5-
The gyroscopic survey for DS 2-22 needs to be reran;, a com-
pletion report for this well will be submitted when the approved
survey is received.
Sincerely,
P. A. VanDusen
.Regional Drilling Engineer
PAV/JG:sm
Enclosures
GRU1/L61
ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA .~
.~ ~ - ' AEASKA ~ AND GAS CONSERVATION cC ".'AISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling well
Workover'operation I--I
2. Name of operator
ARCO Alaska, Inc.
3. Address
P. O. Box 360, Anchorage, AK 99510
4· Location of Well
at surface
1184' FNL, 161' FEL, Sec. 24, TllN, R14E, lg4
5. Elevation in feet (indicate KB, DF, etc.)
46 ' RKB
6. Lease Designation and Serial No.
ADL 28307
7. Permit No.
82-109
8. APl Number
so- 029-20770
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
DS 18-3
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
For the Month of July ,19 82
~12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well @ 0600 hrs, 07/30/82. Drld 17-1/2" hole to 2620'; ran & cmtd 13-3/8" csg.
'.ND Hydril & diverter as of 07/31/82.
See Drilling History
13. Casing or liner run and quantities of cement, results of pressure tests
20" 91.5#/ft H-40 weld conductor set @ 80' Installed w/2940 # Poleset
_3-3/8", 72.0#/ft, L-80, BTC csg W/shoe @ 2600'. Cmtd w/2400'sx Fondu & 400 sx Permafrost C
See Drilling HistOry
14. Coring resume and brief description
None
15. Logs run and depth where run
None to date.
1 6. DST data, perforating data, shows of H2S, miscellaneous data
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SIGNED ~~ TiTLEArea Drilling Engineer
DATE ~/~/~ ~
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
DS 18-3
DRILLING HISTORY
NU 20" Hydril & diverter. Spudded well @ .0600 hrs, 07/30/82. Drld 17-1/2"
hole to 2620'. Ran 67 its 13~3/8'' 72#/ft, L~80, BTC csg w/shoe @ 2600'.
Cmtd 13-3/8" csg w/2400 sx. Fondu & 400 sx Permafrost C. ND 20" Hydril
& diverter as of 07/31/82.
:MEMORANDUM
Sta e of Alaska
ALASKA OIL ~D GAS CONSERVATION COMMISSION
Tots. ~'.~t~on DATE:AUgUSt 3, 1982
Cha~ .
THRU: Lonnie C. Smith ,~c~
Commi s s i One r
FILE NO: 108A/C
TELEPHONE NO:
FRO~: Bobby Foster~~''
~troleum 'Inspector
SUBJECT: Witness BOPE Test on
ARCO's DS 18-3
Sec. 24, TllN, R14E, UN
Permit #82-109
Sun~y,_ A~ug~ust~2,_. 1.982 - After completing a BOPE test on
SOh-i-o~-s'-'-A~25 ~-'w~-nt to ARCO's DS 18-3 and witnessed the
BOPE test at that location.
The test began at 1:00 a.m. and was completed at 4:30 a.m.
As the attached BOPE inspection shows there ~re no failures.
In summary I witnessed the BOPE test on ARCO's DS 18-3.
O&G ~4
4/80
STATE ~,~'~ AI,ASKA
ALASKA OIL & GAS COt;SERVATIO/J COHMISSION
B.O.P.E. Inspection Report
---- [ i~ · . .
Ope ra tot /~Z~
Well ~.~,' ; 8~-' % Permit # (~-'"' /09
Location: Sec ~¢ .T/~ R/,~.~,! U~ . /~oasing se~.2~7~ ft.
Drilling Oontract;~ ~~ ~ Rig ~~epresentativ~¢~¢"~'¢¢
Location, General O~
General Housekeeping
Reserve-pit .... r~~
,_
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Results: Failures
Test Pres sure
ACCUtlULATO R SYSTEt4
]tFull Charge Pressure ~~-~>
-- ·
Pressure After Closure/
ps ig
ps ig
200 psig Above Precharge Attained: - min~3:
Full Charge Pressure Attained: / min
/®
- ., ,- . -"pang..
Controls: Master ~~
~ ~ Blinds switch cove~
Remote
Kelly and Floor Safety Valves
Upper Kelly / Test Pressure
Lower Kelly / Test Pressure
Ball Type / Test Pressure
Inside BOP / Test PresSUre
Cho'ke Manifold Lq~-~J. Test Pressure~j~'~O
No. Valves
No. flanges ~
Adjustable Chokes
Hydrauically operated choke /
T e s t Time- -~-- ~..~-'~ r---s: ......
Repai~-or Replacement of failed equipment to be made within
Inspector/CommisSion office notified.
Remarks:
days and
iDi s tr i~u t iD n
oriq' - AD&GCC
cc - operator
cc - SuPerviso-~i
. Inspect~
ARCO Alaska, Inc.
Post Office Box- ~60
Anchorage, Alaska 99510
Telephone 907 277 5637
July 7, 1982
Mr. C. V. Chatterton
State of Alaska
Alaska Oil & Gas Conservation
Commi ssi on
3001 Porcupine Drive
Anchorage, AK 99501
._
~ STAT TEC
CONFER:
rlLF:
SUBJECT: DS 18-3 Permit Application
Dear Mr. Chatterton'
The proposed depths listed in Block 16 were inadvertently
transposed. The correct proposed depth is 9600' MD (8838' TVD).
Also, the 9-5/8" setting depth (bottom) is 8872' MD, 8200' TVD.
Sincerely,
J~.Gruber
Associate Engineer
JG:llm
cc: K. K. Lenz, ANO 340
Well File
GRU1/L45
RECEIVED
J U L - 8 1982
Alaska Oil & Gas Cons. Commissior~
Anchorage
ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany
July
Mr. Mark A..~jor
Area Dri I Iing Bngineer
ARCO Alaska, Inc.
P. O. Box 360
Anchorage, ' Alaska 99510
~e: PrUdhoe Bay Unit DS 18-3
ARCO Alaska, Inc.
Permit No. $2-109
Sur. Loc. llS4'FI~L, 161'~EL, Sec. 24, TILE, R14E, L~.
Btmhole Loc. 1273.2'FSL, 1339.5'FBL, Sec. 24, TllN, R14E,
OM.
Dear Er. Ma j or:
Enclosed is the approved application for permit to drill the
above referenced wel I.
We. Il samples and a mud log are not required. A continuous
directional survey is required as per 20 AAC 25.050(b)(5). If
available, a tape containin~ the digitized 1o~ information
shall be submitted on all logs for copying except experimental
logs, velocity surveys and dipmeter surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 1§.05.870 and the re~lattons promulgated thereunder
(Title 5, Alaska Administrative Code). Prior to commencing
operations you may be contacted by the Habitat Coordinator's
Office, Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Art. isle 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter ?0) and by the
Federal Water Pollution Control Act, as amended. Prior to
co~m~enctng operations you may be contacted by a representative
of the Departraent of Environmental Conservation.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spt!dried. We would also like to be notified so that a
l~Ir. Ma rk A. Ma J o r
Prudhoe Bay Unit DS 18-3
-2- July ?, 1952
representative of the ~ission may be present to witness
testing of blow, ut preventer equipment before surface easing
shoe is drilled.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
C, V. Chatterto~y
Chairman of ORDER OF THE COMMISSION
Alaska Oil and Oas Conservation Commission
Eric ! o sure
cc= Department. of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
CrC; be
ARCO Alaska, Inc.
Post Office iL ~, 360
Anchorage, Alaska 99510
Telephone 907 277 5637
June 30, 1982
Mr. C. V. Chatterton
Commi s s i oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ss i on
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 18-3, Permit to Drill
Dear Mr. Chatterton'
Enclosed is our application for Permit to Drill DS 18-3 and the
required $100 filing fee. Attachments to.the application include
a plat detailing the section and plan views of the proposed
wellbore; a proximity plat showing the subject wellbore's
position to the nearest well drilled; and a sketch and
description of the BOP equipment; and a sketch and description of
the surface hole diverter system.
As we anticipate spudding this well approximately July 14, 1982,
your. prompt review of this application would be appreciated.
Sincerely,
M. A. Major
Area Drilling Engineer
MAM/JG: 1 lm
Enclosures
GRU1/L40
RE£EIVEI)
J U L - 1982
AI3ska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, inc, is a subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA ~'"~
ALASKA ~IL AND GAS CONSERVATION C~,,AMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work. DRILL ~ lb. Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC
REDRILL [] DEVELOPMENT OIL ~ SINGLE ZONE ~
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2. Name of operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 360, Anchorage, Alaska 99510
4. Location of well at surface IX L ~ L I · "' '" 9. Unit or lease name
1184' FNL, 161' FEL, Sec. 24, T11N, R14E, UM Prudhoe Bay Unit
At top of proposed producing interval JUL-6 1982 We, number
1541' FSL, 1227.7' FEL, Sec. 24, T11N, R14E, UM DS 18-3
At total depth A~JaS~(~I. 0il & Gas Cons. C0mmissi0r 11. Field and pool
1273.2' FSL, 1339.5'~FEL, Sec. 24,T11N, R14E, UN Anchorage Prudhoe Bay Field
·
5. Elevation in feet (i~dicate KB, DF etc.) 6. Lease designation and serial no. Prudhoe Bay 0i 1 Pool
46' RKB, 16' Pad ADL 28307
12. Bond information (see 20 AAC 25.025) I-ederal Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
· ,
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
5-1/2 Mi. NW of Deadhorse miles 161' at surf from ADL 28321 feet 18-2 well @ surface 119.8' feet
16. ProPJik*~iz;k~th (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
8838 ' ND, .. 9600' T'VD" feet 2560 07/1,4/82
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3445 psig@____ Surface
KICK OFF POINT 2700 feet. MAXIMUM HOLE ANGLE 29 oI (see 20 AAC 25°035 (c) (2) 4000 psig@. 8700 ft. TD (TVD)
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
:~0" 20" 91.5# H-40 Welded 80' 30' I 30' 110' ! 110' Poleset
17-1/2" 13-3/8" 72# L-80 Butt 2570' 30' I 30' 2600'112600, 2300sx Fondu & 400sx PF
12-1/4" 9-5/8" 47# L-80 Butt 8136' 29' . ~ "'29' 816_5~.q..~581' 500sx Class G 1st Stage
S00-95 Butt 707' 8165, 17581' 8200' 18872' 350sx PFI, 2nd Stage
,\
8-1/2,, 7,, 29# L-80 Butt 1028' 8572 17938, 960~'~1~38,.
~oosx
Class
G
Ont
,
22. Describe proposed program:
ARCO Alaska, Inc., proposes to directiona]]y drill this we]] to 9600' MD (8838' TVD) to produce the Sad]erochit
/
zone.~/Logs will be run across the entire hole as thins is the first well in the section. A 13-5/8" 5000 psi
RSRRA BOP stack wi]] be installed and tested to 5000 psi. The BOP equipment will be pressure tested each week
and operationally tested each trip. A string of 4-1/2", 12.6, L-80 tubing, packer, and necessary provisions for
subsurface safety equipment wi]] be run. A nonfreezing fluid wi]] be ]eft in all uncemented annuli within the
~ermafrost .interval. The well will be completed as a selective single completion with gas lift mandrels between
the packer~;. A separate Sundry Notice wi]] be submitted when the we]] is to be perforated.A surface diverter~'/
will be used on this well.
-23. I hereby certify that the foregoing is true and correct to the best of my knowledge
SIGNED ,- ~ TITLE Area Drilling Engineer DATE .
The space below for Commission use
CONDITIONS OF APPROVAL
, ,.
Samples required Mud log required Directional Survey required APl number
OYES ~NO OYES .~NO ~YES UNO 50- O ~-~) - ?-
Permit number Approval date
APPROVED BY ~ ,. ~ ,COMMISSIONER DATE .T~]~' ~_ 1~¢1~.
~' ~ -~ by order of the Commission
Form 10-401 GRU1/PD2 Submit in triplicate
.... 0~ IB.,' klEL:L NO~ '3' ;P, ROPOSEOi '
"§' CR5 ING: PT.'
Tl~,,,g4c~ ....
'FtNGEE'~
;i-:40FPl
'3E~OSi!FT (TO TFIRGET)i
: TMO=.744Q OF-J:'=2018
' . Ti'10.--6'-/84 '0E?=2655 ,., , ,1 ":' ~ .....
:" .... i' 9 5/8 CFIS~NG PT T¥0=8200 TMO=88')2"-O-E-~"Z',.~,~07:: ....... 1 .........
"- ! : S¢IG RIVER: TVO=.82~.O TMO=8883'OEP.,27t:3.'. ;:..:! .... i .... ;":::
· · i:~': TVO"tg254 T~10.8933 0~'?-,~7371',.---;'7';:',q, :i :: :i::::!:::::
.... I .... "t'""TOP!SflOi TVD=83~.t T~O=899910EP"2'768:::!!.ii!i! I !'::::'::::
ANNULAR
PREVENTER
BLIND RAMS
PIPE RAMS
DRILLING
SPOOL
PIPE RAMS
RECEIVED
J U L - 6 1982
A!aska Oil & Gas Cons. Commission
Anchorage
13-5/8" BOP STACK DIAGRAM
Accumulator Capacity Test
1. Check and fill accumulator reservoir to proper
level with hydraulic fluid.
2. Assure that accumulator pressure is 3000 psi
with 1500 psi downstream of the regulator.
3. Observe time, then close all units simultane-
ously and record the time and pressure remaining
after all units are closed with charging pump
off.
4. Record on IADC report. (The acceptable lower
limit is 45 seconds closing time and 1200
psi remaining pressure.
..
13-5/8" BOP Stack Test
1. Fill BOP stack and manifold with a non-freezing
liquid.
2. Check that all hold down screws are fully
retracted. Mark running joint with predeter-
mined plug seating depth. Run test plug on
drill pipe and seat in wellhead. Run in lock
down screws.
3. Close annular preventer and chokes and bypass
valves on manifold.
4. In each of the following tests, first hold
a,250 psi low pressure test for a minimum of
3~ minutes, then test at the high pressure.
5. IncreaSe presure to 3000 psi and hold for a
minimum of 3 minutes. Bleed pressure to zero.
6. Open annular preventer and close top set of
pi. pe rams. Increase pressure to 5000 psi
and hold for at least 3 minutes. Bleed pres-
sure to zero.
7. Close valves directly upstream of chokes and
open chokes. Increase pressure to 5000 psi
& hold for at least 3 minutes. Bleed pressure
to zero.
8. Open top set of pipe rams then close bottom set
of pipe rams. Increase pressure to 5000 psi
below the bottom set of pipe rams and hold for
at least 3 minutes.
9. Test remaining untested manifold valves (if
any) with 5000 psi upstream of valve and zero
pressure downstream.
10. Bleed pressure to zero. Open bottom set of pipe
rams.
11. Back off running joint and pull out of hole.
Close blind rams and test to 5000 psi for at
least 3 minutes.
12. Bleed ,pressure off all equipment. Open blind
rams. Make sure manifold and lines are full of
non-freezing liquid and all valves are set in
drilling position.
13. Test standpipe valves to 5000 psi.
14. Test Kelly cocks and inside BOP to 5000 psi with
Koomey pump.
15. Check operation of Degasser.
16. Record test information on blowout preventer
test form. Sign and send to Drilling Super-
visor.
17. Perform complete BOPE test once a week and
functionally operate BOPE daily.
Rev.
5/13/81
SURFACE
HOLE D IVERTER
ARco ALASKA
SYSTEM
:[NC'.
SCHEMATIC
I0" HYD. OPR. BALL VALVE
WELL BORE ISEE DETAIL)
I0" HYD. OPR. BALL VALVE
ALL 90" TURNS ARE "TEE"
CUSHION I '
s~ ~^s~--..p I
~60'
I.
RESERVE
PIT
AREA
NOTE:
FLOVVL INE
F-
DRILLING
RISER
20" 2000 PSI WP
ANNULAR PREVENTOR
20"
CONDUCTOR
PIPE
"DETAIL"
L
Valves on diverter
lines open automati-
cally when the annular
preventer' is closed.
20260102("'
CHECK LIST FOR NEW WELL PERMITS
Comp any :~
Lease & Well No.
ITEM APPROVE DATE
(1) Fee
(2) Loc
,,
thru 8)
YES NO
, , --
i. Is the permit fee attached .........................................
2. Is well to be located in a defined pool ........... ..............
3. Is well located proper distance from property {i'~g ''''.'''.''''.''.'
4. Is well located proper distance from other wells ..............
5. Is sufficient 'undedicated acreage available in this P°°li~iiiii}i i~'
6 Is well to be deviated and is well bore plat included .. .
7~ Is operator the only affected party .................... 1"'
8. Can permit be approved before ten-day wait ................
(3) Adminzq~(/6~ ~g,~x_ 9.
~ thru 11) 10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
(4) casg ~,~.~. 7_f,~>p_
(12 thru 20)
(5) BOPE ~,~. ~-~-g~- 21.
(21 thru 24) 22.
23.
24.
(6) Add:_ ~.~.~. 7-/~- ~'~_. 25.
REMARKS
Geology: Engineering:
~ LCS f~w~'-BEW
rev: 01/13/82
Does operator have a bond in force . . '
. .
Is conductor string provided ........................................
Is enough Cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productiVe horizons .....................
Will surface casing protect fresh water zones .......................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate well bore separation .proposed ...........................
Is a diverter system required ................................. ~ ...... ~
Are necessary diagrams of diverter and BOP equipment attached ....... ~
Does BOPE have sufficient pressure rating - Test to ,6"0oo psig .. ~
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
Additional requirements
Additional Remarks: ~
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIXi
..
No special'effort has been made to chronologically
organize this category of information.
~D
i
0-~ 476. * 42609,, *
.-
j!> ::-:
·
21241. ·
.
t54 ~:y~ *
RbASKA COMPUTZNG CENTER
LIS Tape VerlflcatJon blstlnq
SChlumberger AlasKa Computlnq Center
26-~AY-1989 11:19
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE t 89/05/26
REEL NAME : 73334
C~iNUATION # :
P . IOU$ REEL :
CONNENT : ARCO ALASKA INCe,PRUDHOE BAY ,D.$. 18 - 3,50-029'20776"00
**** TAPE HEADER
8~RVICE NAME :ED IT
APENA~E I 4
~NTXNUATION # t !
P~E~XOUS TAPE
COMMENT I ARCO ALASKA XNC.,PRUDHOE BAY ~D,$, 14 ' 3~$0-029-20776-00
**** FILE HEADER
FILE NA~E : EDIT ,001
I FLXC
~E I 89/05/26
:ZE ti096
~ 50
PA E'
ON
X NC,
~0
LIS Tape Verification List ng
Schlumberger Alaska Comput ng Center
PAGEt
ELEVATIONS K8I 46 DF~ 45 GLI 16
DATE bOGGEDI IS-MAY-BE
RUN NUMBERI ONE
TD DRILLERI 9604
TD bOGG~R~ 9601
CASING
C~SiNG
Tg.5/B" 47 LB 9 DRILLER DEPTH OF -,.* TO 0 AND I.,OGGER DEPTH OF '-., TO 8918
~29 LB I~ DRILLER DEPTH OF ,,*o TO .8587 AND LOGGER DE:P~H OF e,.. TO 0'665
,6 LB ~. DRILLER DEPTH OF .,. TO 37 AND LOGGER DEPTH OF ,,- TO 8536
B"T ! 12 1/4"
B~T SIZE I
LINER
TYPE FLUID IN HOLEI CRUDE/SEAWATER
TIME LOGGER ON BOTTOMI gllO
MAXIMUM TEMP RECORDEDI 194
LOGGING DISTRICTI
bOGGING ENGINEERI
WITNESS1
PRUDHOE BAY
PORTER ! ~ES[
MORRIS/gROWN
TOOL NUMB£RS~AL.UB 6i4
PTS-A 63
BHP a
NG
MARKS
(
Tape Verification Listing
Schlumberger AlasKa Computing Center
26-MAY-1989 11:19
THIS DATA HAS NOT BEEN DEPTH SHIFTED - OVERLAYS FIELD PRINTS
* SCHLUMBERGER LOGS INCLUDED WITH THIS TAPEr *
FILE
PASS tX COMPENSATED NEUTRON tnb
PASS ~2 COMPENSATED NEUTRON CNL
PAS8 #3 COMPENSATED NEUTRON CNL
PASS #4 COMPENSATED NEUTRON CNL
CNL HODGE$.LEHMAN AVERAGEO
riLE EDITeO02t
BASE PUMP IN TEMPERATURE LOG *
eras #i PUMP IN TEMPERATURE LOG~
PASS #2 PUMP ZN~ TEMPERATURE LOG
PASS #3 PUMP ~ TEMPERATURE LOG
PASS 14 PUMP &N TEMPERATURE LOG
PASS #5 PUMP IN TEMPERATURE LOG
CML)
TABLE TYPE ! CONS
TUNI
~N
V{
~n
Tape Vertflcatlon Llstinq
5¢hXumbegger AlaSka Comput!nq Center
26-~AY-lg89 11~19 PAGEt
TUNI VALU DEE's!
TDD FT 9604,
FT 959 Bottom
900~'
Top
I FT
Ttma
TABLE TYPE S CURV
R~
DEFI
DEPTH CHANNEL NAME
NEUTRON POROSITY
CALIBRATED THERMAL NEUTRON RATIO
RAW CORRECTED NEAR THERMALCOUNTS
RAW CORRECTED FAR THERMAL COUNTS
CORRECTED NEAR THERMAL COUNTS
CORRECTED PAR THERMAL COUNTS
Gamma Ray
Tenston
C:CL AmpXitude
NEUTRON POROSITY
THERMAL NEUTRON
:AR TH!
THERMAL COUNTS
THERMAL COUNT~
~S
TS
RAW
on
NEUTRON RATIO
TED FAR T~ERMAL: COUNTS
Tape Verification Listlnq
$C~lumberqer AlasKa Computinq Center
26-MAY-1989 ZIIi9
** ~ATA FORMAT SPECIFICATION RECORD **
** SET TYPE
TYPE REPR CODE VAbUE
6 0
66
9 65
3 66 0
0
** sET .? **
NANE 8ERv UNIT SERVICE AP APl
~U
)!
Tape Verification [,lsttn~
S~hlumber.qer Alas~a Computtnq Center
26-NA¥-1989 11:19
DRDE~ # bOG TYPE CLASS MOD NUMB 8AMP ~EM CODE
°i
b~
i 0 Ol 0
, CPS
HbA Pu 4
i
! 4 68
t 4 68
I 4 68
I 4 68
9.6 000
9600 O0
4
NPH ~
CNb ' ~
N{
PH):
TNRA
CFTC
tnb
CNL,
2{'
LIS Tape veri[lcatlon Listing
SChlumberger AlasKa Computtno Center
26-MAY-1989 11:19
PAGEI
D~PT
RCFT
T£N8
GR
NRR
NFH!
c~C
CCL
TI
T{
Rt
9400,000
CNE 1457,457
CNb 1140.000
CNI 4096,000
C~ 21.688
CN3 74
CN3 0,000
CNb
ooo
5O6
~5 000
0
9200 0 0
1987 9~6
000
9 000
43~
NPHI CNb
CNTC tnb
CCh
RCFT
TENS CN
RCNT
GR~CN2
TNRA N3
CFTC
NPH! HbA
NPHI CNh
CCh CNb
RCFT
~CNT
TNRA
CFTC CN
NPH! HEA
~TC
NPH CNb
I
20 934
5114 719
0 000
1266 533
1~ 000
0 000
18 408
TNRA CNb
CFTC iNb
NPHI Nt
CNTC
GReeN3
TNRA CNb
CFTC tnb
NPIt: N
c.,,
"c l
1
52t
12t
0 TNRA
3 878 RCNT,CNb
1370
19
415~
1209
858 Gn
TNRA
$31 TENS
678
c{
4
i
4l
1
~!$ ?a~e verification blstin
C~lum eraer Alaska ComOutin~ Center
26-MA¥-1989 11119
DEPT
RCNT~CN1
,CN2
:
NPHI~CNb
CNTC CNb
CCb,CNL
RCFTCN1
TENS
RCNT CN2
GR. CN2
TNRACN3
CFTC CN$
NPHI HbA
'999,2~0
'999,250
~999~250
999.250
-999'250
-999.2~0
e999,250
4e20t
.g09,027
999.250
TNRA,,CNb
CFTC, CN6
NPHI, N~
RCFT iN2
~EN$~N2
RCN~ N3
GR CN3
-999 250
-999 50
.,,9!
)4~
RCNT
NA~E I EDIT ,001
CE ! rblC
tON I O0~A02
REC SIZE I 1096
TYPE I bO
NAME ,002
ON
bE
COMPANY
N:OR~H:$bOP,E
LIS Tape Verificati.on Listino
Schlumberger Alaska Comcutino Center
26-MAY-1989 11:19
APl NUMBER{ 50-029-20776-00
~OMPUTING CENTER REMARK$I
PRE-PUMP TEMPERATURE PASS MADE 15-MAY-89108156
POSTePUMP TEMPERATURE PAS5 1{ MADE {~-MA¥-8911{t,i{
POST-PUMP TEMPERATURE Pas8# MADE 15-MAY-891i2157
POST-PUMP TEMPERATURE PASS # NADE 15eMAY-:~t{{142
POST-PUMP TEMPERATURE PASS #4 MADE 15-MA¥-89{14{35
POST-PUMP TEMPERATURE PASS 15 MADE {5'-MAY-89115120
~ SCHLUMBERGER LOGS INCLUDED I ~
FILE EDIT,O021
BASE PUMP IN TEMPERATURE bOG (,PIT)
PASS #i PUMP IN TEMPERATURE bOG
2
PUMP IN TEMPeRAtURE bOG
PASS # pPI3)
PAGE{ 9
~UN!
.
T
P EST
Name
Sehlum~ercjer AlasKa
Center
26-MAY-1989 11~19
PAGE I ! 0
TUN! VAbU DEr!
8TE~ OEGF ~ 30 e
TABLE TYPE I CURV
:PT
DEFI
DEPTH NEb NA~E
Gamma
Cb Ampi TEMPERATURE
TSA rbO
PISA FbU]D TEMPERATURE
PTSA FLUID TEMPERATURE
PTSA FLUID TEMPERATURE
PTSA FbUID TEMPERATURE
PTSA FLUID TEMPERATURE
e~ ~ATA FORMAT SPECIFICATION RECORD
?Y'PE R~PR CODE VAb'UE
66
( (
~i$ tape Verification Listing
SChlumberger AlasZa Computlnq Center
26-MAY-1989 11~19
*$ SET TYPE =
NiNE SERV UNIT SERVICE APl AP1 APl APl rILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMe EbEM CODE
FT 357~$9
GAPI
DEGF 3571~9
DEGF 357~19
DEGF
DEP?
PIT
PIT
PIT
PI
O0
4:2
42
4
4
89O O0 0 ~ ! i 4 68
8gO O0 0 ! ! 4 68
890 O0 0 2 i 1 4 68
89O O0 0 2 I 4 68
89 0 0 1
89~ ~0 0 t ! 4 68
O(
O~
00~
t0
PAGEI
I!
DEPT
DEPT,
,Pll
,,PIS
PIS
9628,000 GR PIT
-99~250 PTE~:pZ2
187,?05
9~,066 PT~M.
188,060
9500 O00 GR.PIT
I~I':764 PT~M.PI2
,~ ,~ ~388
1500962 PT
168~666
5:'00 G R,
w999,250 CCh,PIT
186,609 PTEMePI3
,250 :¢:Cb,
,609 P~EM,
-99:9,))(~ PTEM,PlT
2.60, PTEM,Pi4
0 0..0
186 !l~ PT~lq.
:
LI~ Tame Veritic~tion Llstlng
Schlumberger AlaSka ComputinO Center
26,,MAY-,1989 11:1,9
PAGE
END OF OATA **
~I~E NAME t EDIT ,002
lICE { F~IC
;iON ! 001A02
'K { 89?05/26
REC SIZE t 1096
**** TAPE TRAILER ****
NA~E : EDIT
D, '~ t 89/05/26
~N I FLIC
~GINAME' N I 73334
NUATIO #
US TAPE
I. NUA?ZONi #
IOt)$ R££L { H E B
CONMENT I AiRCO::A~hASKA
,D,18-i8 "3~,'50-029-20776'00
COMPANY : AIL~NIiC RICB}'IELD CO.
WELL : Ef~II~[ SITE {~-]
PAGE
· {1~07~: FLOW RA'JII~' UN] T~
# ENGLISH #
# BB/D - BARREL& PER D~
~}3D - ~'H(USAND CU. FT. PEP
~ETR ~C
~3/.D - C J' NETERS ?,
KM.3D -THOUfAND CU'
BUBBGE PO[.NT PRESSURE
FORMATION VOL.F~C,, OIL
FCJF MAT ION VUL.f'A¢.,
COMPRESSIBIbI~Y, GAS
SPEC,G~A¥1T¥,FREE GAS
SPEC,G~AVITY,DISS.GA$
1.78
9530.00 9520.00
~ 3995.000 P$1G 9600,00 - 9500,0~
~ 14-7~000 ~I~ 99999.0 -
BPPRE$,IPR ~ 3995,000 P$IA 9580.00 - 9540.D0
-999,250C 9540.00 9530 O0
3995,000 9530.00 9520~00
H( : .0042922 V/V 9580 O0 - 9540,00
-999.2500 9540~00 95]0.00
.0042895 9530 O0 9520 O0
BO.IP~ : 1.339624 ¥/¥ 9580~00 - 954)~0
o999.250C 9540 00 9530 O0
1.339552 9530:00 9520:00
~ = 1.015223 V/V 9580.00 - 9540.00
-999.2500 9540.00 9530,00
!.015133 9530.00 9520,00
gGAS.~P~ : 9527~1~ V/V 9580.00 - 9540.30
-999 250C 9540 O0 9530.00
9~§4837 9530:00 9520.00
$CF~ : 5600000 9580 O0 - 9540,00
-~99.2500 9540:00 9530.00
.560000¢ 9530.~0 9520,00
$GDG : .8000000 9580.00 - 9540,00
COMPANY *. ATLAI~TIC R1CIil~,IELD CC.
WELL : DRIi~L SITE 18-3
PAGE
GAS VISCOSITY
OIL VISCO~ r¥
WATER VISCOSITY
GVI$C.IPR
OVI$C.IPR
DENSITY OF OIL BH00
DENSITY. WATEB RHOW
-999.250C 9540.00 9530.00
.8000000 9530.00 9520.00
$0 b. GRS-O! 1~' RAT I O
;(209E94 CP 9~80,00 -1~540 O(
-999,2500 9540.00 9530:00
.0209924 9530.00 9520,00
t~.8850000 CP 9580,00 - 9540.00
-999.2500 9540.00 9530°00
,8850000 9530,00 9520,00
J~200000 CP 9550.00
-999.2500 9540-00 9530.00
.320000( 9530.00 9520.00
: 7491615 G/C3 9580.00 - 954).00
-~9~,25.0¢ ~9'540'00 9530,00
, ,7492015 9530.00 . 9520.00
lO0 ,
: :~9850056 GtC3 95~0 9540 O0
.
999.2500 9540.00 9530,00
*~98~S0929: 9520.00
SGOR.!.P:R"".:~. t 680,0000: :F3/B: 95.810.00: ".95.4:0.00
3933.6
3923.6
3913.6
2 3903,6
!
5i,04
40 ~
TOTIL 161 111
71,4 174 130 88
60,0 79 59 40 2
TOTAL 189 131
81-4 198 148
7~ C 93 69 47 2
TOT%~ 2~ tSO
TOTAL 2~ 16~
TOT !~
2 ~583,6 411,~ 966 72! 490
I 400. 509 I 380 2$8
TOTRL ~ 101
8:,40
2 3483,6 511,4 11_87 886 602 1
I 500.0 67.9 I 470 319 14
TOTAL 1355
937
2 3383,6 611,4 1402 1047 712 2
I 600.0 746 I 55~ 379 17
TOT mL 1 60 {
3283.6 711,4 1612 1203 818 2
700,0 860 1 64~ 436 19
,1
983o6
1
1
~000~ 207 3
TOTAL 4414
3011.4 4927 3678 2501
3000,0 2663 5 11988 1.352
TOT%L 5665
3995 0 5461 I 4~7 2772
3983~6 ~955 6 ~206 ~500
TOTIL 628~
305i
5
56
391 {~
6
6O
,5
5
RECEIVED
AUG ~ ~ 1982
Oil & Gas Cons. Commission
Anchorage
LVP 010,H01 VERIFICATION LISTING PAGE 1
** REEL HEADER
SERVICE NAME :SERVIC
DATE :82/08/17
ORIGIN :
REEL NAME :REEL ID
CONTINUATION #
PREVIOUS REEL :
COMMENTS :REEL COMMENTS
** TAPE HEADER
SERVICE NAME :SERVIC
DATE :82/08/17
ORIGIN :1070
TAPE NAME :65454
CONTINUATION # 501
PREVIOUS TAPE
COMMENTS :TAPE COMMENTS
FILE HEADER
Ib'E TYPE
PR:ZVZOUS:.:FZ
LVP 010,HO1 VERIFICATION LISTING PAGE 2
RECORD TYPE 047 **
SCHLUMBERGER
ALASKA COMPUTING CENTER
COMPANY
WELL
FIELD
COUNTY
STATE
ATLANTIC RICHFIELD COMPANY
D.S. 18'3
PRUDHOE BAY
NORTH SLOPE BOROUGH
ALASKA
JOB NUMBER AT ACCI 10707,65454
RUN #I, DATE LOGGED{ I3 AUG 1982
LDPI HGH
8OTTOMDEPTH = 9684
TOP :DEPTH = 8900,
CASING = 13 3/8:IN, 2598 F.T.
TYPE FLUID : 8..5:[N
bVP 010.H01 VERIFICATION LISTING PAGE 3
DENSITY = 10.4 LB/G
VISCOSITY = 40,0 S
PH = 11 5
FLUID bO~$ = 5,~ ¢3
RM ~ 1,090 $ 100,0
R"F , 0.950 ~ lO0,O
RMC = 1,180 ~ t00,0
RM AT BHT = 0.670 ~ 167,0
NATRIX SANDSTONE
DF
DF
DF
DF
LISTING REPRESENTS A MERGED PRODUCT, RUNS #1, AND #2
==============================================================================
..... ALASKA COMPUT~N~.CENTER_ _
COMPANY = ATLANTIC RICHFIELD COMPANY
WEbb = D~ 18-3
FIELD' = PRUDHOE BAY
.~: NO:RTH S:bOPE B ROUGH
ALASKA
bVP 010,.01 VERIFICATION LISTING PAGE 4
dOB NUMBER AT ACCI 10707,65435
RUN #I, DATE LOGGEDI 9 AUG 82
bDP{
BOTTOM DEPTH m 8570
TOP DEPTH a 2598
CASING ~ 13 3/8 IN, X FT,
BlT SIZE m 12 1/4 IN
TYPE FLUID = LIGNOSU~r~NATE
DENSITY ~ 10,8 bB/G
VISCOSITY ~ 46 S
FLUID LOSS ~ 6 C3
R~ ~ 1,310 ~ 82 DF
R~F ~ ~260 ~ 64 DF
'RM AT BHT z 9 I
MATRIX SANDSTONE
LVP OIO,H0t VERIFICATION LISTINO PAGE 5
· * DATA FORMAT RECORD *~
ENTRY BLOCKS
TYPE SIZE REPR CODE ENTRY
8 4 73 60
9 4 65 ,lin
0 1 66 0
DATUM SPECIFICATION BLOCKS
MNEM SERVICE SERVICE UNfT AP[ AP! AP[ AP! FILE SIZE PROCESS SAMPLE REPR
ID ORDER # bOG TYPE CbASS MOD NO.
DEPT FT 0 0 0 0 0
SFbU DIL OHMN ? 0 0
ILM DI~ OHMM ? 0 0
ILD DIL OHMM ? 12 46
SP DIL MV 7 1 0
GR DIL GAPI ? 31 32
NPHI FDN PU 42 68 2
RHOB FDN G/C3 42 35 1
DRHONEAT FDNFDN G/C3 42 42 4~4
CODE
I 68
0 '0 I 68
0 0 I 68
0 0 I 68
0 0 I 68
0 0 I 68
0 0 1 68
0 0 1 68
LEVEL
4 0
4 0
4 0
4 0
4 0
4 0
4 0
4 0
bVP OIO,HO1 VERIFICATION LISTING PAGE 6
NCNb 3574,0000 FCNb
DEPT 9300 0000 SFbU
SP -I04:3750 GR
GR 23,8906 CAb!
NCNb 4180,0000 FCNb
DEPT 9200,0000 SFLU
SP -92,6250 GR
GR 28,6875 CAbI
NCNb 4424,0000 FCNL
DEPT 9100,0000 SFbU
SP -9322,0000
NCNb 3662' 625 CAb!
, 000 rCNb
DEPT 9000,0000 SFbU
SP -45,9375 GR
GR 74,0000 CALl
NCNb 4752,0000 FCNb
DEPT 8.900,0000 SFbU
SP 24.9375 GR
1493,0000 DT 104,5625
432,0000 ibm
27,4375 NPHI ~.0000
,94!4
21~2~0000 D? 0000
1024,0000 IbM 111,2500
8,6797 DRHO ' , 073
2696,0000 DT 91,7500
465.5000 ILN ~
!773,6016 DRHO ~ 0093
,0000 DT ~
,3750
107,0625 IbM 45,6875
79,0625 NPHZ 1!,7930
oooo
GR
IbP
RHOB
NRAT
GR
ZbD
RHOB
NRAT
GR
ZLD
RHOB
NRAT
GR
RHOB
NRAT
GR
24,6406
250,2500
2,1680
2½'7520
,4375
602,5000
2,!465
1,5391
2e,7344
2, 9?3
,55
t,6511
79,0625
,000,0
~0'78t
LVP OIO,HO1 VERIFICATION LISTING PAGF, 7
GR 149,7500 CAb! 12,
NCNb 2082,0000 FCNL 635,
6641 DRHO
0000 D?
DEPT 8200,0000 SFLU 2,1816 IbM
SP '46,0625 GR 160,6250 NPH!
NCNL 1885'0000 FCNb 494,5000 DT
DEPT 8100,0000 SFbU 1,
SP -52,0625 GR 120,
OR 120,2500 CAbI 12,
NCNb 1969,0000 FCNL 486,
DEPT 8000 0000 SFLU
OR 77-937, 5 CALl 13
NCNb 2218,0000 FCNb 619
DEPT 7900,0000 &FLU
SP '49,8125 GR
GR 86,1250 CAb!
NCNL 2544,0000 FCNL
0000 SFLU 2,
0000 FCNb ?20,
DEPT 7~00,
NCNb 2304,
DEPT :7700,
SP '49;
DEPT 7'600 0000 8rbu
0850 ibm
2500 NPHI
8906 DRHO
5000 DT
NCNb 2400
,2686 IbM
,9375 NPHI
,4531 DRHO
,0000 DT
2168
12.50
5000
2402: IbM
5:000 DT
9727
6:87:5:
453.t .:DRB:O:
50:00 :D?
0
=999
i
39
0
-999
0
-999
1
-999
'999
748 999
,0137 NRA? 3
.2500 GR -999
7 RHOB ~
,O00S NRAT
.2500 OR '999
.0244 IbD 0
,5020 RHOB 2
,0073 NRA? 3
,2500 GR -999
,5059 ILD 1
,2305 RHOB 2
,0142 NRAT 3'
,2500 OR -999
,3164 !bP ~
,7598 RHOB
,0073 NEAT -99~
,2500 GR
,0273
~2500
7070
3984
4902
2500
,9546
,3281
4893
~004
477
2500
,29~0
:2soo
LVP OlO,HO1 VERIFICATION LISTING PAGE 8
SP -565.~313 GR 86
GR 8! 375 CALI 14
NCNL 2128 0000 FCNL 648
DEPT 7100 0000
SP -41:0625 GR 88
OR 88,1250
NCNb 2482,0000 FCNb 744
DEPT 7000,0000 8FLU 2
GR 86,
NCNb 2550.0000 FCNb 755
DEPT 69.00,0000 &FLU ~
SP 71.8125 GR 6
NCNL 2 ,0000 FC 68
DEPT 6800,0000
SP -78,
GR 62,
NCNL 2346,0000
SFLU 2
FCNb 767
GR ' ,69
NCNb 2496
.0000 rCNL
DEPT 66'0:'0,
NCNb
00:00 'SFbU
9375 NPH! 31.2988 RHOB 2,4082
4219 DRHO 0.0054 NEAT 3,1035
5000 DT -999.2500 GR -999,2500
S94iLM ~ 3,i055
250 NPHI 2 ,5684 Ifad
,9805 RHOB 2, 848
4844 DRHO '0,0005 NEAT 3. 195
5000 DT '999,2500 GR -999,2500
3633 IbM 2,662! 1ED 2,8262
828~ DRHO 0.00~0 NEAT 3,0898
5000 DT -999; 2500 GR -999,2500
,59 NPH! 3 .0059 RHOB .3086
.6484 DRHO 90,0166 NEA2' ~ 0645
· 0000 DT '99 ,2500 GR '99 ',2500
,9473 IbM 3 0000 IbD 3,0586
5938 NPHI 2~ ~,3184
9922 DRHO ' 8652
0000 DT "999: GE -999,2500
~0625NP~ HI 2? *::0508 :RHOB
,., 0,0278 NRAT
500:0 : D:T 999 i: 250'0
bVP OiO,HOI VERIFICATION blSTING PAGE 9
DEPT 6100 0000 SFbU 2
SP -93:0625 GR ?1
GR 71~3125 CAbI 13
NCNb 1994.0000 FCNL 523
DEPT 6000 0000 8FbU 5
GR 51i CALl 14
NCNb 2380 0000 FCNb 947
D£PT 5900,0000 SFbU 2
SP -132.3750 GR 34
GR 34.0000 CAb! 12
NCNb 2502.0000 FCNb 744
D£PT 5800
SP "8i
GR 6
NCNb 1901
DEPT 5700
P '88
GR 56
NCNb 2 316
DEPT 5600
NCNb 2100
D. EPT 5500
SP "'95
G.R : 65
NCNL 2256
OEP', 5400
-118
5i:
NCNb 23:3:2
DEPT 5300:
..... GR 90
1'/03:
D~PT
SP 83
GR 85
NCNb 199:2
~NL
,4414 ILM
.3125 NPHI
.5625 DRHO
.5000 DT
.0156 IbM
,~750 NPHI
, 828 DRHO
.5000 DT
,7637 IbM
.0000 NPHI
,5156 DRHO
.0000 DT
0
-999
.9365 ILD i
.7422 RHOB
.0103 NEAT 3
.2500 GR -999
.9951
.3848
.3242
.2500
3
21
0
-999
.5918 IbD 3
.9727 RHOB 2
.0303 NEAT 2
,2500 GR -999
,5000
,4668
,4805
,2500
I 3193 ILD 1
31:5430 RHOB 2
-0.~088 NEAT 3
'999, 500 GR -999
500
,0000 SFLU 2,5977 IbM 2.5391 ILD 2,6406
,~12255 GR 64.8125 NPH! 30.1074 RHOB ~,3652
, CALl 14,2578 DRHO ,0649 NEAT ,3066
,0000 rCNb 525.5000 DT -999.2500 GR -999.2500
,1348 IbM
,0938 NPH!
,6875 DRHO
· 0000 DT
3125 NPH!
64.84~ =DRHO
OO00::DT
,0000 &FLU ~
,3750 GR 5~
,0938 CALl 15
,0000 FCNb 690
.0000 8rbU 2,
,3750 OR 72,
' 312:5 CAb'i 15;,
.00'00 rCNb 529'
,O000:. SFLU
,06:25' OR
,6875 I:
,0000 :rCNb
,0:000 5fLU 2
,0000 :GE 5,1
,0000 :FCNb ,:648
,0000 8fLu 4
8,125 '-GR : : : :::85
· 0000 rCNb 539
O,
-999'
6230 IbD
4688 RHOB 22
0049 NEAT
250O GR
3
-999
0781 I'LD 3, ,3047:
0,0.20 NRA? :3,
,'~2:5 0 0 GE ,,999 ,: 2500
-999.
4,70?0 :::' I:L:D
5840: :: RHOB
:: 0:, ~R AT
5,'0234
,
'999.2.500
, .
LVP OlO,HOi VERtFICATYON LISTING PAGE 10
DEPT 5000 0000 SFLU 3
SP -1i7~0625 GR 43
GR 43,3438 CALl 12
NCNb 2164,0000 FCNL 635
DEPT 4900 0000 SFLU 4
SP '98'
,3125 GR 57
GR 57,2500 CAb! 14
NCNL 2156.0000 rcNb 537
DEPT 4800 0000 SFLU 3
GR 57,84 37 CALI 13
NCNb 2100,0000 FCNb 589
DEP? 4700,0000 SFbU 4
SP -94,0625 GR 79
GR 79,0625 CALl
NCNL t926,0000 FCNL 475
DEPT 4600
SP -107
GR 58
NCNb 1887
4500
'98
NCNb
D EPT
NCNb
OEPT
SP
2108
4~00:
,97:
4200
too
0000 SFLU
,0371
,3438 NPHI
,9531 DRHO
,0000 DT
,1953 IbM
,2500 NPH!
,0547 DRHO
.0000 DT
8750 Ib~
,8437 NPHI
,5625 DRHO
,5000 DT
0938 IbM
:0625 NPH!
,5469 DRHO
,5000 DT
4
58
1'3
550
,0000 $
:~300705 CF~ 49'7
,0:000 SrbU
3750 GR
:093.8!: CA
,0000 FCNb : 531
,0000
,5352 IbM
,6875 ~PHI
,0547DRHO
,5000 DT
1.9092 IbD
3~,3242 RHOB
.0151 NRAT
'999,2500 GR
~!,9297 IbP
,0898 RHOB
99~,0020 NRAT
- ,2500 GR
3,3262 IbP
300,1074 RHOB
,0190 NRAT
.-999,2500 OR
' RHOB
0,0000 NRA?
...99..2500 GR
1.8330
2 1504
3:1348
-999,2500
3,7383
2,1719
3,6895
"999.2500
3.4609
....999:2500
4,7500
2.2988
3,6367
-999.2500
3:,6553 lbD
3!,546; 9 RHOB
.012'7 NRA?
"'99 2 500 GR "99
'5000 D:T : '999125-00: GR
4,4:1-4 ~: Z b~
,:0000 :::: ~:8:F5 U 4,8242 :: :':I~L M
'8:~25 OR: : 58,;8750
87'50': CAb!: ': :: ' :i 2: ; 9:9i2: 2-: ::::DRHO
00.00 FCN[, 57.0;000:0 DT
GR 6~ 0313 CA~!
~C~L 20§- 0000:
DEPT : 4000 0.:00:0 SFLU
8P -,134:8750 GR
OR 5:0:, 4688 CALl
3-, 6914 :' :!bt~~'
5:0,:4688: NPH!
t'2-6328 O~HO
9
,2500
''999,2.500 Gl;{ ,,999
,4844 ': :ZLD 2,37]0
RHOB 2,1.172
~0:044 3,4961
bVP OlO,HO1 VERIFICATION LISTING PAGE
NCNb 2029,0000 FCNb 521,0000 DT
-999,2500 GR
-999,2500
DEPT 3900,0000 SFbU 4,~375 IbM
SP -~26,5625 GR 58,8125 NPH!
GR 58,8125 CAb! 12,4766 DRHO
NCNb 2096,0000 FCNL 492,5000 DT
i6406 IbD
8457 RNOB
~0 0088 NRAT
-999,2500 GR
3,14863
758
O0
DEPT 3800.0000 SFbU 4,3906 XbM 3.9980
SP -120,8750 .~R~ 64,a125 NPH! 37,0605 RI. lOB
GR 64,8125 ,,.~bI 14,1875 DRHO -0,0039 NRAT
NCNb 1857.0000 FCNL 472,2500 DT -999.2500 GR
4,0664
2,2539
3,4141
-999,2500
SP '13 ,2500 GR 4 .6250 NPHI
GR 45,6250 CALl 12,~891 DRHO
NCNb 2002.0000 FCNL 544.5000 DT
,7 637
3 ,,8906 RHOB
'0.152~2 NRA?
'"'999, 0 GR
2,6094
2,1797
~,4238
-99 , 2500
DEPT 3600.0000 $FLU 2 8359
1802,3750 LI i2 578 DRHO
NCNL
,0000 FCNb 426 7500 DT
. 8242 IbD
4 ,1934 RHOB
'0,0093 NRAT
'999,2500 GR
3.0879
,1758
,994!
-999,2500
3500.0000 SFLU ,8262 IbM
DEPT "121'
5P 4375 (IR 61,1562: N:P'HI
· , DT
D£PT 340 0:000: $FbU 2,3.7-50 IbM
9
N.C N L 0000 : FC Nb 4,97., 50:00
-999
5693 · !:bO !
I:
GR .999
:
,4678
2500
859;0000 re:Nb
470
3200:00-00 'SF~U 4~
GR
5059
;:
2500
DEPT
DEPT ~30:00:, 0000: 8FLU 2,2:324::':::'I:1[:i~ i',, 382869:73:: 'IbDRH:OB
$:P. 135,25000 GR 50,7500 NPHI 42
NCNb 1:958,0000 FCNb 505,250:0: DT -9.99,:2500 GR
,, 999
623:0
LYP 010,H01 VERIFICATION LISTING PAGE 12
GR 43,4063 CAb!
NCNL 1433,0000 FCNL
DEPT 2800 0000 8FLU
SP -147~3750 GR
GE 33,4375 CALI
NCNb 1284,0000 FCNL
DEPT ~70~,0000 SFLU
SP . 12 ,8750 GR
GR ~,3125 CALl
NCNb ,3 .0000 FCNL
DEPT 2600,0000 SFLU
SP -1~75.437255 GR
GR ,81 CALl
NCNb 1268,0000 FCNL
DEPT
SP
CNL
. i.oooo
,5625 GR
-999,2500 CAb!
-999,2500 FCNt
15.5859 DRHO
300.7500 DT
2 1680 ILM
I , 828 DRHO
303,0000 DT
50, NPHI
17,3906 DRHO
296,0000 DT
I 9346 IbM
17,56 ~ DRHO
261,5000 DT
2000,0000 IbM
]1,2656 NPH!
-999,2500 DRHO
-999,2500 DT
FILE NAME"I,;SERVIC,OOI
L'ENGTH { i024
.
EX? FILE N:AME i
'0,0049 NRAT 4,4336
-999.2500 GR -999,2500
1 2090 ILD 1 0332
-999 2500 GE -999,2500
6
. 457 RHOB 2,
0,0093 NRAT 4,4 09
-999,2500 GR -999,2~00
6,6055 IGD 2,4961
', 5 NRAT ,4883
'999,2500 GR -999,2500
ooo.oooo
500 RHOB -999,2500
'
99,2500 NEAT
'9.99,2500GR -999,2500
DATE ~82-/08/1~7
:ORiGt~ Ii070
DATE 182/,08/17
ORiGiN ~
'
EXT Rggb NA,
COMMENTS: IREE:~ CO~
bVP 010,HO! VERIFICATION bIS?ING PAGE 13
5IS TAPE
'P 010,H02 VERIFICATION LISTING
: RgB5 HEADER **
:RViCE NANE :EDIT
~TE :87/06/18
:EL NAME :72~27
INTINUATION #
~E¥IOU$ REEL :
)NMENT$ :LiS TAPE, ARCG ALASKA, IRC, DS 18-3, API 50-029-20776
TAPE HEADER **
:RVICB NANE :EDIT
~TE :87/06/18
~PE NAME ~
]NTINUATION ~ :01
[EVIOU$ TAPE :
)~ENT$ ~SIS TAPfl, ARCO ~L~$~A, IRC, DS ~8-~, API 50-029-20776
FILE HEADER
[5E NAME :EDIT ,001
~RVICE NA~E
~RSION #
~TE :
kXIMUM LENGTH : 1024
[LE TYPE
{EVIOUS FILE :
INFORMATION RECORO$ ~*
CONTENTS
ARCO ALASKA, IN¢,
DS
PRUDHOE BAY
lIN
24
NORTH
ALASKA
CONTENTS
UNIT TYPE CA~E SIZE CODE
000 000 018 0~5
000 000 010 065
OOO 000 012 0~5
000 000 004 0~5
000 000 004 065
000 OOO 002 065
000 000 012 065
000 000 006 065
000 000 OOl 0~5
~P O!O,HOR VERi.~ICATiO!'~J LIS~i'l!~G PAGE 2
IMPANY = ARCO AhASKA, INC,
'~EbD = PRUDHOE 8AY
~ATE =AbASKA
}B NU~ER AT AM~CC: 72327
IN ~ DATE bOGGED:
~P~~'M KOHRING
~MING = 9,625" ~ 8918'
~PE FLUID = PRODUCED FLUIDS
~TRIX SANDSTONE
c*** TMI$ DATA MAS ~OT BEEN Of]PTM $~IFTED - OVERLAYS FIELD PRINTS
VERIFICATION LIS~.ING PAGE 3
SCHLUMBERGER 60OS INCLUDED WITH THIS FILE{
<FILE NAME ~ EDIT.O01> <SAMPLE RATE ~ -0.5>
SEE FiLE EDIT,O02 FOR COLLAR ~OCATOR DATA
CASED HOLE
DATA AVAILABL~ 9blb,5' ~0 8957,
DATA AVAILABLE{ 9613~0 TO'BE57'
DATA,AVAILALbE, g61~eO TO B95B,
CN6 (HODGES-LEH~ANN AVERAGED
DATA AVA~LABLE~ 9616,5" TO BgS?,
CASING(P
GAMMA. R~Y IN ASS4)
DA~A AVAILA~LEt B996,0" TO B~96,
~ DATA FORMAT RECORD
~TRY BLOCKS
TYPE $I~g REPR COO£ ENTh¥
2 1 66 0
4 1 66
8 4 7 3 60
9 4 65
o 1 6~ 0
iTU~ SPECIFICATION ~i~OCKS
VEM SERVICE SERVICE UNIT AP1 API API APi FILE SIZE SP6 REPR
ID ORDER # LOG TYPE CLASS MOD NO, CODE
¢OCTAb)
~P OlO,H02 VERiFICATIOi'~ b.!,$TIt~iG PAGE 4
:PT FT O0 000
I PSi. GAP[ O0 310
~HI PSi PU O0 890
IAT PSl O0 420
~RA PSI O0 000
:NL PSI CPS O0 330
~b PSI CPS O0 330
t PS2 G~I O0 310
'~I PSg PO O0 890
~AT PSR O0 420
~RA P$~ O0 OOO
~NL PS2 CPS O0 330
~b P$2 CPS O0 330
~ PS3 GAPI O0 310
~AT P$3 O0 420
aRA PS3 O0 000
:Nb P.53 CPS O0 330
:Nb PS3 CPS O0 330
t P$4 G~PI O0 310
~H! HbA P~ O0 890
O0 0 0 ,~
ol 0 o 4
00 0 0 4
O! 0 0 4
0 0 0 0 4
31 0 0 4
3O 0 0 4
O1 0 0 4
O0 0 o 4
O1 0 o 4
O0 0 0 4
31 0 o 4
30 0 0 4
01 0 0 4
0 o 0 0 4
Ol o 0 4
O0 0 0 ~
31 0 0 4
30 0 0 4
O1 0 0 4
O0 0 0 4
DATA **
.PT
~RA
>HI
96!7,0000 GR
-99 2500 NRA, T
'999,2500 GR
'999~2500 NCNb
2'1,8320
~RA
~RA
>HI
9600,0000 GR
4,0625 NCNb
2b,bO02 bRAT
441,2500 GR
4.3438 NCNb
25,6836
~:PT
iRA
PHI
~RA
PHI
9500,0000 G~
~,SJgM NCNb
35,30~1 NRAT
588,0000 G~
5,937~ NCNb
34,8755
qRA
PHI
9400,0000 GR
3,~72 NCNb
18,7~88 bRAT
1389,0000 GR
3.J5'i4 ~C~b
~9,2017
73 1875 NPMI
2030 0000 FC~L
-999 2500 RNRA
-999 2500 NPHI
-999 2500 FCNL
73 1875 NPHI
1991~0000 FCNL
4,b328 ~NRA
62,8125 hPH1
2058,0000 ~C~b
19,2187 DPHI
3196.0000 FCNL
5.6719 RNRA
19 b250
3300:0000 FCNL
18,484~ ~PHI
4936 0000 FCNL
3:5938 ~NRA
17,5313 ~PHI
4772,0000 FC~L
1 68 00000000000000
i b8 00000000000000
1 68 000.00000000000
I 68 00000000000000
1 68 00000000000000
I 68 00000000000000
I 68 00000000000000
1 ~8 00000000000000
1 68 00000000000000
I 68 00000000000000
I 68 O000000OO00000
I 68 O000000OO00000
I 68 00000000000000
I 68 00000000000000
I 68 00000000000000
I 68 00000000000000
! 6~ 00000000000000
I 68 00000000000000
I 68 00000000000000
1 68 00000000000000
1 68 00000000000000
27,8320 bRAT
446 5000 GR
-999 2500 NCNb
27 8320 bRAT
-999 2500 GR
4
-999
-999
-999
-999
7813
2500
2500
2500
2500
24,5117 NRAT
489.7500 GR
4,8125 mCmb
25,6836 bRAT
473.7500 GR
4
2124
4
-999
"/5O
0000
5195
2500
32,4219 NRAT
b60,O000 G~
5 500() NCNb
34i8755 NRAT
555 5000 GR
5,3320
18,7656
3234,0000
b,8047
-999,2500
20,4590 NRAI'
1276,0000 GR
3,5039 mChb
19,2017 bRAT
1421,0000 GR
~,8104
15,4219
486~,0000
J,b879
'999,2500
gPT 9300,0000 GR 1'1,75(~0 i~iPHI !1,1875 bRAT 3,3730
IP 010,H02 VERIFICATION LISTING PAGE 5
~RA 3,1035 NCNb
~HI 17,8711 NRATt
~Nb 1 568,0000 GR
~RA 3,3477 NCNL
~HI i 7,6025
4684 0000 FCNL
3 4668 R~RA
i5 6328 NPHI
4868 0000 FCNL
gPT 9200,0000 GR
~RA 2,5176 NCNb
~HI 11,8652 NRA?
~Nb 2368,0000 G~
~RA 2,,6953 NC~L
~HI 12.0850
16
59o 4
2
19
blg2
3750 NPHI
FCN{,
1875 NPHI
0000 FCNL
,IRA
9100 0000 GR
3 3125 NCNL
19 2383 N~AT
1483 0000 GR
3 4121 NCNL
18 8599
19 0469
5032 0000
3 6523
19 7813
4832 0000
NPHI
FCmb
RNRA
NPHI
FCNL
~RA
?HI
?HI
9000
3
17
1632
17
0000 GR
2227 NCNb
578I NRAT
O00O GR
5254 NCNb
8223
37 1562 NPHI
5316 0000 FCNL
3 4258 ~NRA
40 8750 NPHI
5700 O000 FCNL
.~PT
?HI
2Nb
?HI
8900 0000 GR
-999 2500 NCNL
-999 2500 N~AT
-999 2500 GR
-999 250{) NCNL
-999 25~0
1509,8000 GR
3. 625 NCNb
17,6025 NRAT
1454.0000 GR
':PT
PHI
'~IRA
PHI
8800,00U0 GR
-999.2500 NCNL
-999.2500 NRAT
-999'2500 GR
-999,2500 NCNb
-999,25U0
12,2559 NRAT
2341~.0000 GR
2 5938 NCN~
2296,0000 GR
18 6035 NRAT
1519 0000 OR
~3 4375 NCNb
18 8599 NRAT
1416 0000 GR
gPT
PHI
NRA
PHI
8700.OOUU GR
'999.2500 NCNb
'999,2500 ~A?
~999.25U0 GR
-999 2500 NCNb
-999~2500
7.5758 NRAT
16 9.0000 OR
3,4590 NCNb
17.8223 NRAT
1616,0000 GR
F. PT
,NRA
PHI
CNL
NRA
PHI
8~00 0000 GR
-999 2500 NCNb
-999 2500 NRAT
-999 2500 GR
-999.25U0 NCNL
-999.2500
-999,2500 ~,iPHI -999.2500 NRAT
-999'*~500 FCNL. -999,2500 GR
:999'2500 RNRA -999,2500 NCNb
999.2500 NPMI -999,2500 NRAT
-999.2500 FCNL -999,2500 C;R
-999 2500
'999 2500
'999 2500
'999 2500
'999 2500
NPMI
FCNL
RNRA
NPHI
FCNL
-999 2500 NPHI
-999 2500 FCNb
-999 2500 RNRA
-999 2500 NPNI
'999 2500 FCmb
i 999.2500 NP,I
999.2500 FCNL
999.2500 RNRA
-999.2500 i~PH]
-999.2500 FCNL
-999,2500 i~RAT
-999.2500 GR
.-999,2500 NCNb
999.2500 NRA?
· .999.2500 GR
-999.2500 NRAT
-999.2500 GR
-999.2500 NCNb
-999.2500 NRAT
-999.2500 GR
-999.2500 NRAt
-999 2500 GR
-999:2500 NCNb
-999.2500 NRAT
-999.2500 GR
1~,9141
4804,0000
~.4414
-999.2500
2 7051
14 1875
6144 0000
2 6855
"999 2500
3,5684
19,7656
5100,0000
3,:5938
-999,2500
J,4395
35,4688
5648,0000
3,:5371
999 ~'2500
-999 2500
-999 2500
-999 2500
-999 2500
'63 4375
-999 2500
-999 2500
-999 2500
-999 2500
35 6875
:999,2500
.999,2500
999'2500
-,9,.~500
84, 25
-999,2500
-999,2500
-999,2500
-999,2500
60.0625
'P 010.HOH V'ERIFICATION LiSTIN~ PAGE 6
:PT 8..500.0000 GR
IRA 999,2500 NCNL
'HI -999i2500 ~RAI'
'N
· L -999'2500 GR
IRA -999.~500 NCNL
~MI -999. 500
-999 2500 NPHI
-999 2500 FCNL
-999 2500 RNRA
-999 2500 NPHI
-999 2500 FCNL
;PT
'HI
'HI
8400 0000 GR
-999 2500 NCNL
-999 2500 NRAT
-999 2500 GR
-999 2500 NCNL
-999 ZLO0
-999 2500 NPHI
-999 2500 FCNL
-999 2500 RNRA
-999 2500 NPHI
-999 2500 FCNL
:PT 8396,5000 GR
iRA -999,~500 NCNL
'HI ~999,2500 NRAT
:N~ ~999;2500 GR
IRA ~999,2500 NCNL
~HI -999;2500
-999,:2500
-999; 500 FCNL
-g99,1500 RNRA
.,999' 2500 NPHI
-999,2500 FCNL
FILE TRAILER
[LE NA~E ~EDIT .001
:RVICE NAME
i~$I0N ' :
[LE TYPE
CXT FILE NA~E
:999.2500 NRAT
999.2500 ~R
i 999.Z500 NCNL
999,2500 NRAT
999,2500 ~R
-999 2500
-999 2500
-999 2500
-,,,
-999i!500 NRAT -999,2500
-999 500 GR -999,2500
-999 500 NCNL
-999..2500 NRAX -999*:2500
-999,2500
,,999,2500 NRAT
-999 2500 GR
- 2500 NCNL
-999999 2500 ~,
-999 2500 GR
0
'""II o
-999,
~999d250~
FILE HEADER
[LE NAME IEDIT ,002
~RVICE NAME
~TE :
%XI~[J~ LENGTH = 1024
[bE TYPE
~EVIOUS FILE
~ COMMENTS **
THIS DATA HAS NOT ~EEN DEPTH SHIFTED - OVERLAXS FIELD PRINTS
'P OlO,H02 VERIFICATION LISTING PAGE 7
<FILE NAME = EDIT,O02> ¢$AMPLE RATE
CASING COLLAR LOCATOR bOG
DATA AVAI~ABLE~ 9 b 9 ' ~0 895'?,
CASING CO~AR LOCATOR bOG
CASING COLLAR LOCATOR LO~ (PASS3)
DATA AVAILABLE: 961~.~17
CASING COLLAR LOCATOR LOG
DA~A AVAILABhE~ 8996,~17" TO 8396,5'
DAtA FORMAT RECORD
TYPE SIZE REPR CODE ENTRY
2 ! 6~ 0
4 I 66
8 4 73 10
9 4 65 ,lin
16 I 66 1
0 i 6~ 0
%TUM SPECIFICATION BLOCKS
IEM SERVICE SERVICE UNIT API APl API APl FILE SIZE SPL REPR
PROCES~
fP OlO,H02 VERIFICATIO~ LIST!NG PAGE
ID
:L PS4
FT
DATA **
'2PT 9610,9160 CCh
· .999,2500
~PT 9600,2500 CCL
-999,2500
~PT 9500,2500 CCh
?I' 9400 ~500 CCI[.,,
-999 :~ 500
oo.] oo cct
-999, . .500
:.PI 9200,2500 CCL
,'999,2500
gPhT 9100,2500 CCL
-999,2500
gPT 9.000 2500 CCL
999:2500
gPT 8900,2500 CCL
O, 0000
gPT 8800,2500 CCi,
0,0000
ZPT 8700,2500 CCL
0,0000
EPT 8600,2500 CC[,
0.0o00
gPT 8500,2500 CCL
2L 0.0000
gPT 8400,2500 CCh
35 0, OOOO
EPT $396,5000 CCh
~b -999.2500
bOG TYPE CbA$$ MO0 NO,
O0 000 O0 0 0
O0 150 Ol 0 0
O0 150 O1 0 0
O0 150 O1 0 0
O0 150 01 0 0
-999.250O CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
'999,2500 CCh
-999,2500 CCh
'999,2500 CCh
-999,2500 CCh
-999,250o CCh
-999.2500 CCh
-999,2500 CCh
CODE (OCTA6)
68 O0000OO0000000
68 00000000000000
68 00000000000000
68 00000000000000
68 00000000000000
'999,2500 CCh
0,0000 CCh
0,0000 CCh
0,0000 CCh
0,0000 CC'b
0,0000 CCh
0,0000 CC~
0,0000 CCh
'999,2500 CCh
-999,2500 CC~
-999,2500 CC~
-999,2500 CCh
-999,2500 CCh
-999,2500 CC&
-999.2500 CCh
-999,2500
0,,0000
0,0000
0,0000
0,0000
0,0000
0,0000
0,0000
'999,Z500
-999,2500
-999,2500
'999,2500
'999,2500
-999,2500
-999,2500
lP 010,?{02 VER!FIC 'lION L!STIi~G PAGE 9
~ FILE; TRAIbCR **
[bE NAME :EOIT ,002
CRVICE NAZi :
~T$ ~
~XI~U~ LENGTH : 1024
[LE TYPE :
~XT FILE N~E ;
EOF
TAPE TRAILER **
gRVICE NAME :EDIT
%TE ~87/0b/18
~PE NA~E :
]NTINUA~ION # :0i
~XT TAPE NAME :
3MMENTS Ibis TAPE, ARCO ALASKA, INC, DS 18-3, API 50-029-g0776
RREEb TRAILER
VICE NAmE :EDIT
87/06/18
EEL NA~E 172t27
3NTINUATION #
~XT REEL NAME
3MMENTS :bis TAPE, ARCO ALASKA, INC, DS 18-3, APl 50'029-20776
EOF **********