Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout182-133PLUGGi-~G & LOCATION CLE~--~A~C~ RFPORT State cf Alaska ALAS~ 0iL & GAS C~NSE~VATION COMMISSION '~'e i ! ! o~? ~o~o ~- o© Review ~h~e well file, a,:,~' ¢~-~--: on pluq~.ng, suauus, ~ !ocati:n ~! ' ' loc. well hea~ =lear. co~e. 5 Wall hea~ ch= u~f: Harkar pos= or pla=a: Loca=icn Clearance: ~, 5 ,--Xb.%h x Conclusions: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil D Gas D Suspended ~] Abandoned ~! Service 2. Name of Operator 7. Permit Number Phillips Alaska, Inc. 182-133 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-20808 4. Location of well at surface 1 ~oC~~ 9. Unit or Lease Name 4577' FNL, 1008' FEL, Sec. 2, T10N, R14E, UM (asp's 685970, 5941299) ~~ Prudhoe Bay Unit At Top Producing Interval~~ ' 10. Well Number 2770' FNL, 33' FEL, SEC. 2, T10N, R14E, UM (asp's 686899, 5943131) 06-23 At Total Depth ' 11. Field and Pool 2502' FNL, 5004' FEL, Sec. 1, T10N, R14E, UM (asp's 687199, 5943406) Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 74 feetI ADL 28311 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if el/shore 16. No. of Completions October 1, 1982 October 18, 1982 April 14, 2000 (P&A'd)I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 9875' MD / 9238' TVD 9517' MD / 8939' 'I-VD YES r~ No DI 2099' feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, FDC/CNL/GR/CAL, CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO-I-I'OM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20' 91.5# H-40 Surface 79 30' 1990# Poleset 13-3/8" 72# L-80 Surface 2525' 17-1/2" 2400 Sx Fondu & 400 Sx PFC 9-5/8' 47# L-80/S00-95 Surface 9016' 12-1/4' 500 Sx Glass G & 50 bbls PFC 7" 29# L-80 8697 9870' 8-1/2' 325 Sx Class G 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5-1/2' 8657' 8644' 4-1/2" 8754' * Plugged & Abandoned all open perforation intervals. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ORIGINAL (See P&A Summary) 27. PRODUCTION TEST Date First Production Method el Operation (Flowing, gas lilt, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate · 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. * This 10-407 is submitted as directed per the 10-403 form approved March 22, 2000 (Approval #300-059) Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME Top of Sag River Sand Top of Shublik Top of Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 9039' 9078' TRUE VERT. DEPTH 8536' 8569' 8614' Top of Zone 4 9130' 9458' 8890' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS Summary of 06-23 Pre Coil Tubing Sidetrack Plug & Abandonment Operations. 32. I hereby certify that the following is true and correct to the best o! my knowledge. Lamar L. Gantt T'~le PAl Coil Tubing Drilling Supervisor Date INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. : - :~., ;.. -...~ Item 28: If no cores taken, indicate "none". Form 10-407 06-23 DESCRIPTION OF WORK COMPLETED PRE COILED TUBING SIDETRACK PLUG & ABANDOMENT SUMMARY Date Event Summary 3/11/2000: 4/08/2000: 4/11/2000: 4/12/2000: 4/14/2000: 4/16/2000: RIH & tagged PBTD @ 9663' ELM. MITIA to 3000 psi - passed. RIH & set Whipstock, orientated 7.4° left of high side. Top @ 9515' MD. MITOA to 2000 psi - passed. A CTU Cement Plug was pumped to Plug & Abandon the lower wellbore prior to ST operations as follows: MIRU CTU & PT'd equipment. RIH w/CT & killed well w/160° F Slick Water. Fluid packed IA & tubing. RIH to top of Whipstock. Pumped 25 bbls of 15.8 ppg Class G Cement (5 bbls w/Aggregate) past the Whipstock to abandon the open perforation intervals located @: 9598' - 9612' MD (Zone 2) 9640' - 9650' MD (Zone 2) 9654' - 9660' MD (Zone 2) Reference Log: BHCS 10/17/1982. Placed 12 bbls of Cement behind pipe @ a max squeeze press of 1000 psi. Contaminated cement w/Biozan & jetted contaminated Cement f/the wellbore to the top of whipstock. POOH w/CT. FP'd well. RD. WOC. RIH & tagged Top of Whipstock @ 9517' MD. Continued w/06-23A Sidetracking Operations. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_X Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well_ Plugging _X Time extension _ Stimulate _ Change approved program Pull tubing _ Variance _ Perforate _ Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development__X RKB 74 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 Service__ Prudhoe Bay Unit 4. Location of well at surface v~ ,,," v"' 8. Well number 4577' FNL, 1008' FEL, Sec. 2, T1 ON, R14E, UM (asp's 685970, 5941299) 06-23 At top of productive interval 9. Permit number / approval number 2770' FNL, 33' FEL, SEC. 2, T10N, R14E, UM (asp's 686899, 5943131) 182-133 At effective depth 10. APl number 50-029-20808 At total depth 11. Field / Pool 2502' FNL, 5004' FEL, Sec. 1, T1 ON, R14E, UM (asp's 687199, 5943406) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 9875 feet ~ Plugs (measured) Tagged PBTD @ 9660' MD on 2/08/2000. true vertical 9238 feet -v'/ Effective depth: measured 9660 feet Junk (measured) true vertical 9058 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 79' 20" 199o# Poleset 79' 79' Surface 2451' 13-3/8" 2400 sx Fondu & 400 Sx PFC 2525' 2525' Production 8942' 9-5/8" 500 Sx Glass G & 50 bbls PFC 901 6' 8516' 1173' 7" 325 sx c~ass G 9870' 9233' Perforation measured RECEIVED true vertical 9007'-9018'; 9042'-9050'; 9053'-9058'. ;./~A,~ 0 8 2000 Tubing (size, grade, and measured depth 5-1/2', 17#, L-80 PCT @ 8657' MD; 4-1/2', 12.6~, N-80 PCT @ 8754' MD. A~~ ~l,~C~l~, Packers & SSSV (type & measured depth) 9-5/8" X 5-1/2" BAKER SAB PACKER @ 8644' MD. 5-1/2' CAMCO BAL-O SSSV @ 2099' MD. 13. Attachments Description summary of proposal ._X Detailed operations program __ BOP sketch __X 14. Estimated date for commencing operation 15. Status of well classification as: May 1,2000 16. If proposal was verbally approved Oil __X Gas __ Suspended __ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Stephen Ward @ 265-1305. Signed BruceE."~~Srni,h, P.E. ~' ~~'C~0i~ ,...~,/~ ,.~l~..~ll't,,~-riUe: AAI Coil Tubing Drilling Supervisor Date Prepared b)/ Paul Rau~ 263-4990 FOR COMMISSION USE ONLY Conditions of approval: Notify Comrn. ission so represent~,~'ve maywitness Approval no,~=~_~ .,, Plug integrity~__ BOP Test _~ Location clearance __ Mechanical Integrity Test__ Subsequent form required 10- L'~{~) Approved by order of the Commission ~OhC, ftN-Chdstenson _4009~j Commissioner Date Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE DS 6-23 Intended P&A Procedure Ob. iective: P&A existing interval and if scheduling permits, mill window in 7" casing in preparation for CT sidetracking operations. Intended Procedure RU slickline unit, tag bottom and run a Kinley caliper log in the 7" casing. · RU e-line unit, run and set top of whipstock in 7" casing at - 9515'. · RU CT. Pump 20 bbls Class 'G', 15.8 ppg cement. · Clean cement top to -9525' md (KOP for CTU drilling at 9520') · WOC, Tag top of whipstock. If scheduling permits, mill 3.8" window in 7" casing at 9520' md with service unit. RECEIVED March 6, 2000 6-23A Proposed CT Sidetrack Horizontal 5-1/2" Tubing 5-1/2" Camco BaI-O Nipple @ 2099' Packer @ 8644' 7" Liner Top 8697' 4-1/2" DB6 Npl @ 8741' TOO in 7" 9250' Whipstock set and cemented in place with top @ -9515' 7"Casing Shoe @ 9870' 5-1/2" Camco MMIG GLM's(10) of 2-7/8" Liner in 4-1/2" TT @ 8675' 9-5/8" Casing shoe @ 9016' Initial Perfs Window cut in 7" at ! -9520 - 9525' / 4-1/8" Open hole Current perforations cement squeezed 2-7/8" liner TD @ - 10625' RECEIVED ',',~;AP, 0 8 ?_000 Ataka Oil & 6as Co~s. C~m'mt~ ARCO ALASKA, INC. NIP Tubing-PC Gas Lift Mandrel/Valve 1 Casing Gas Lift Mandrel/Valve 2 Gas Lift Mandrel/Dummy Valve 3 Gas Lift Mandrel/Dummy Valve 4 Gas Lift Mandrel/Dummy Valve 5 Gas Lift Mandrel/Dummy Valve 6 Gas Lift Mandrel/Dummy Valve 7 Gas' Lift Mandrel/Dummy Valve 8 Gas Lift Mandrel/Dummy Valve 9 Gas Lift Mandrel/Dummy Valve 10 PBR PKR XO Tubing-PC 8741' MIN ID = 3.813" (4-1/2" Camco Db6 Nip) NIP Liner sOSUB 'l-rL Perf / Per1 SQZ Perf --~ / Perf SQZ FISH Prudhoe Bay APl: 5002920808® Orig Compltn: 10/22/82 SSSV Type: Last W/O: 10/19/82 Annular Fluid: Diesel/9,6 NaCI Ref Log Date: 10117/82 Reference Log: BHCS RKB: 74 ft Last Tag: 9645 TD: 9875 ftKB Last Tag Date: 11/19/99 Max Hole 38 deg @ 6500 Angle: 06-23 Angle @ TD: 34 deg @ 9875 Rev Reason: JEWELRY BY VG Last Update: 11/23/99 Feet Description 1173 Liner 2525 Casing 9016 Casing Well Type: PROD Angle @ TS: 32 deg @ 9130 'Depth.'Annotati6n~ i ::::~ i:: Depth Comment 8741 8741' MIN ID = 3.813" (4-1/2" Camco Db6 Nip) Gene~iNot~::.:: ~::'" ::'i':: i ' Date Note 1-FL ELM @ 8741: ELM Tubing Tail (Logged 09/17/87) Daterun: 1982-10-22 'Other(piugS, eqUiP.,:etc:): JEWELRY Depth TVD Type Description 2099 2099 NIP 5-1/2" Camco BAL-O SSSV Nipple. 2099 2099 DSSSV 11/19/99- Set 5 1/2" Camco DSSSV. 8631 8175 PBR 5-1/2" Baker PBR Assembly 8644 8187 PKR 9-518" x 5-1/2" Baker SAB Packer .8657 8199 XO Crossover 5-1/2" x 4-1/2" 8741 8274 NIP 4-1/2" Camco DB-6 Nipple 8753 8285 SOSUB 4-1/2" BakerShearout Sub - 8754 8286 'ITL 4-1/2" Tubing Tail F~ih ~FiSH ?::.:::~ ::::::: .:: :: i.:. :' Depth Description Comment 9870 FISH CTU Treating PKR Element !Casingstrih~' ~::Aii: :::: · SiZe ' 'Weight Grade ' TOp Btm 7.000 29.00 L-80 8697 9870 13.375 72.00 L-80 0 2525 9.625 47.00 L-80 0 9016 'TUbing.strings-All : =:::i i Size Weight Grade Top Feet Description 8657 Tubing-PC 97 Tubing-PC Btm 8657 8754 5.500 17.00 L-80 0 4.500 12.60 N-80 8657 G~ :CiffMand.~ls/valves :: Stn MD 'FVD Man Man VMfr VType VOD Latch Port TRO Mfr Type 1 2929 2929 CAMCO MMIG CAMCO GLV 1.5 2 4763 4757 CAMCO MMIG CAMCO OV 1.5 RK 0.375 3 6120 6022 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 4 7211 6914 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 5 7829 7450 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 6 7906 7518 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 7 8244 7821 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 8 8313 7883 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 9 8535 8087 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 10 8607 8153 CAMCO MMIG CAMCO DMY 1.5 RK 0.000 1. RDO-20 DC ID 4.562 4.562 0.000 0.000 4.500 3.813 0,000 0.000 Date 6/15/94 Date VIv Run Commenl RK 0.250 1766 6/18199 R-20 Interval TVD Zone status FeetSPF Date Type 9640 - 9546 8958 - 8963 ZONE 2 O 6 4 2/16/91 APERF 9560- 9600 8975- 9008 ZONE 2 O 40 0 5/1/83 IPERF 9596 - 9600 9005 - 9008 ZONE 2 O 4 6 8/31190 RPERF 9598- 9600 9007- 9008 ZONE 2 O 2 4 3/2/95 RPERF 9600- 9612 9008- 9018 ZONE 2 O 12 4 3/2/95 APERF 9616- 9630 9022- 9033 ZONE 2 O 14 4 511/83 IPERF 9616 - 9630 9022 - 9033 ZONE 2 O 14 010/25187 RPERF 9640 - 9650 9042 - 9050 ZONE 2 O 10 6 8/24~85 APERF 9640 - 9650 9042 - 9050 ZONE 2 O 10 0 10125187 RPERF 9640 - 9650 9042 - 9050 ZONE 2 O 10 6 12/17/91 RPERF 9654 - 9660 9053 - 9058 ZONE 2 O 6 6 9/17/87 APERF 9654 - 9660 9053 - 9058 ZONE 2 O 6 0 10/25/87 RPERF 9654 - 9660 9053 - 9058 ZONE 2 O 6 6 12/17/91 RPERF sti~Ui~ti6~ &: ?reatrnen~' ': . : Interval Date Type 9540 - 9660 12/7191 SQZ 9560-9660 9/26/87 SQZ 9560-9600 10/25/87 SQZ Comment RECEIVED 0 6/18/99 (1) 0 1/1/60 RD 0 4/7/95 RD 0 1/1160 RD 0 1/1160 RD 0 1/1/60 RD 0 1/1/60 RD 0 4/7/95 RD 0 4/8/95 RD Comment 0 8 2000 ,,Maek:m OU & Co s. Comm Mon Anchorage 6 3 1. ~000 PSI ?" W£LLHCAD CONNECI'0R FLANG£ 2. ~000 PSi 4 1/16" PIPE RAUS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS ~. ~ PSi 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUIFIRING BOX H ] REL ] NE I L BOP EOU ] PMENT 1. 5000 PSI 7" WELLHEAD CONNECIOR FLANGE : 2. 5DOD PSI W~RELIN[ RAUS (VARIABLE SIZE) 3. 5DOC) PSI 4 1/6" LUBRICATOR I , 4. 5000 PS~ 4 1/6" FLOW TUBE PACK-OFF i CO]~LED I*UBI. NG UNIT BOP EOU ] PMENT ,., GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10228 Company: Alaska Oil & Gas Cons Corem Attn.' Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 Well Job # 6/6/96 D.S. 11-13A~ ?1,1, D.S. 3-33 D.S. 1-15A D.S. 1-17A ......... Field: Log Description Date 96144 'CNT-D 960506 96056 CNT-D 960214 PROD PRC~FtLE 96051 5 TEMPERA"d}RE Prudhoe Bay 960505 D.S. 1-19 .... PROD PROFIi..E 960425 D.S. 2-2 ....... PERF Ir:~ECOF{D 960511 D.S. 2-4 ~- PERFIqEC(~I':ID 960507 D.S. 2--10 ...... PERF I~ECOI'ID 960507 D.S. 2-25 .... ....... D.S. 3-12 D.S. 3-17 ...... D.S. 4-30 ST -- D.S. 5-16A c .... D.S. 5-25 .... '~ D.S. 6-08A ~ D.S. 6-23 ~"'-'~ PROD PR(.'~i:iLE 9604 INJEC PR( '~FiI_E 9605 INJEC PR¢~FIt..E 9605 CNT-D 9605 TBG PATCH & POGLM 9604 DUAL BUI~ST TDT-P 9604 PROD PROFILE 9604 PROD PROFILE 9604 CNT-D 96O5 LEAK DE'I'ECTION 9605 PERF RECO}tD 9605 PROD PRe)FILE 9604 PERF RECORD 9605 PERF RECOF~D 9605 D.S. 11-13A v-' D.S. 11-23A ~ D.S. 11-30 D.S. 15-39 D.S. 16-5 ,__i D.S. 18-01A ~ 27 01 01 10 26 25 24 24 06 O6 10 30 04 01 BL RF Sepia 18-34 ~ I PROD PR(,FtI_E E D: __ ~'__-&z% ___ ~_ '-:_ .... I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I I DATE: Anadrill Anadrill Anadrill Performance Letter D.S. 960427 SIGN Thank Please slgn and r~furn one copy of this trm~smittal to Sherrie at the above address. you. Survey Calculation Program Floppy Disk STATE OF ALASKA ALASkr, ,":'ilL AND GAS CONSERVATION )M~AlSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service RECEIVED Alaska Oil & Gas Cons. Commission Anchora." 6, Datum of elevation(DF or KB) 74 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Per,~rnit number/approval number 82-1~r3 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool feet 12.. Present well condition summary Total depth: measured true vertical 9875 feet 9237 feet Plugs(measured) PBTD Tag @ 9663' MD (2/13/95) Effective depth: measured 9663 feet true vertical 9060 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 79' 20" 1990# Poleset 79' 79' Surface 2451' 13-3/8" 2400 sx Fondu & 400 sx PFC 2525' 2525' Production 8942' 9-5/8" 500 sx Class G & 50 bbl PFC 9016' 8514' Liner 1173' 7" 325 sx Class G 9870' 9233' Perforation depth: measured 9598-9612'; 9640-9650'; 9654-9660' true vertical 9006-9018'; 9044-9050'; 9053-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657' MD; 4-1/2", 12.6#, N-80, PCT @ 8754' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644' MD; Camco BaI-O SSSV @ 2099' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 427 3759 148 1610 14665 209 Tubing Pressure 259 368 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Title Engineering Supervisor r,r,' N'7 II, A/I::) Date SUBMIT IN DUPLICAT_E_~~- 6-23 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 2/1 3/95: RIH & tagged PBTD at 9663' MD. 3/2/95: MIRU & PT equipment. Reperforated: 9598 - 9600' MD (Z2) Added perforations: RIH w/perforating gun & shot 14' of perforations as follows: Ref. Log: BHCS 10/17/82. 9600 - 9612' MD (Z2) Ref. Log: BHCS 10/17/82. Used a 3-3/8" carrier & shot 4 spf at 60 degree phasing at underbalanced pressure. POOH w/perf gun. Rigged down. Returned the well to production & obtained a valid welltest. Schlumberqer 1 GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9310 Company: 3/1 O/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk :D.S. 3-19 PERF RECCRD 022795 1 1 D.S. 4-35 DUAL BURST TDT-P 022895 I 1 - D,S, 6-23 PERF RECORD 030295 I 1 D,S, 7-32 PERF RECORD + JEWELRY 0226 95 I 1 i D.S. 16-21 CHEMICAL CU'I-rER RECORD 022595 I I - =D.S. 7-19 95016 CNL 111394 1 i, ,,, , , , SIGNED: ~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest NO. 9228 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 2/3/95 500 W. International Airport I~,a~ Anchorage, AK 99518-1199 -., .~. ', · ATTN: Sherrie " ...... Aac~i0rag~ Field: Prudh0e Bay Floppy Well Job # Log Description Date BL RR Sepia RF Sepia Mylar Disk O.S. 5-11 94409 DUAL BURSTTDT-P 120294 1 ,, D.S. 1-22A DSI 01 1 395 I 1 D.S. 3-3 PROD PROFILE 01 0 5 95 I 1 ,, D.S. 3-8 PROD LOG 01 0 6 95 I 1 D.S. 3-11 INJEC PROFILE 01 0595 I 1 D.S. 3-14 PERFRECORD 01 0895 I 1 , D.S. 3-22 PROD PROFILE 01 0895 I 1 D.S. 3-25A PROD PROFILE 01 0995 1 1 D.S. 3-24 PROD PROFILE 01 0795 I I , , D.S. 3-31 PROD PROFILE 011 1 95 I 1 D.S. 4-41 LEAK DETECTION 01 1 095 1 I , , D.S. 6-23 PROD PROFILE 01 1 1 95 I 1 ,, D.S. 7-13A PROD LOG 01 0 6 95 I I ,,, D.S. 9-11 PROD PROFILE & JEWERLY LOG 01 06 95 I 1 , , , .... , D.S. 9-42 PROD PROFILE 011 095 I 1 ,, , ...... ,.S. 11-23A DUAL BURSTTDT-P 0121 95 I I ,,, , , DIS. 11-23A CNTG 01 2095 I 1 . D.S. 13-3 REPEATA PATCH SETTING RECORD" 01 0595 .... I I ....... :~ D.S. 13-33 INFLAT BRIDGE PLUG RECORD , 01 0595 ,,, 1 1 ..... ~' D.S. 15-30 , LEAK DETECTION ..... 01 0995 1 1., ' D.S. 16-6 PROD PROFILE 01 0 8 95 I 1 {~b.S. 16-15 ,,, PRODLOG 01 0795 ,, I I SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ---- ALASKA,: ,_AND GAS CONSERVATION CC, .... vllSSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E, UM RECEIVED JUL 2 5 1994 Alaska Oil & Gas Cons. C0mmissi0 Anch0ra~e 12. Present well condition summary Total depth: measured true vertical Other 6. Datum of elevation(DF or KB) 74' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Pe.,~mit number/approval number 82-1/~3 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool 9875 feet Plugs(measured) PBTD Tag @ 9664' MD (6/11/94) 9237 feet feet Effective depth: measured true vertical 9664 feet 9061 feet Junk(measured) Casing Length Conductor 79' Surface 2451' Production 8942' Liner 1173' Size Cemented Measured depth True vertical depth 20" 1990# Poleset 79' 79' 13-3/8" 2400 sx Fondu & 400 sx PFC 2525' 2525' 9-5/8" 500 sx Class G & 50 bbls PFC 9016' 8514' 7" 325 sx Class G 9870' 9233' Perforation depth: measured 9640-9650'; 9654-9660' true vertical 9044-9050'; 9053-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657' MD; 4-1/2", 12.6#, N-80, PCT @ 8754' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644' MD; Camco BaI-O SSSV @ 2099' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 341 ~ 1628 99 -- Subsequent to operation 595 2394 616 -- 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations Oil x...~. Gas .__ Suspended _._ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Engineering Supervisor Form 10-404~Flev 06/15/88 111~1/11 I,~'1~1~' r,r,..l~:n .IWP Tubing Pressure 262 312 SUBMIT IN DUPLICATE ~< 6-23 DESCRIPTION OF WORK COMPLETED SELECTIVE ACID STIMULATION TREATMENT 6/1 1/94: RIH & tagged bottom at 9664' MD. 6/15/94: A Selective Acid Stimulation for cement filtrate damage removal was performed as follows: MIRU CTU & PT equipment. Loaded the wellbore w/Crude & RIH w/CT mounted inflatable packer. Inflated & set packer at 9639' MD to protect the squeezed perforation intervals located between 9540' MD & 9630' MD. Pumped the stimulation fluids to treat the open perforation intervals located below the packer at: 9640 - 9650' MD (Z2) 9654 - 9660' MD (Z2) Ref. Log: BHCS 10/17/82. Pumped: a) 35 bbls 1% NH4CI Water down CT @ 3.1 bpm, followed by b) 25 bbls Xylene / Xysol Preflush @ 3.0 bpm, followed by c) 27 bbls 9% HCI - 1% HF @ 2.9 bpm, followed by d) 48 bbls 15% HCl w/10% Xylene @ 2.8 bpm, followed by e) 25 bbls Xylene / Xysol @ 3.0 bpm, followed by f) 60 bbls 1% NH4CI Water w/5% Musol @ 3.0 bpm, followed by g) 295 bbls 1% NH4Cl Water Displacement @ 3.0 bpm, followed by h) 60 bbls 1% NH4CI Water w/5% Musol @ 2.9 bpm, followed by i) 40 bbls 1% NH4CI Water @ 2.8 bpm, followed by j) Shutdown. Deflated & POOH w/packer. Rigged down. 6/25/94: Pumped ESL Scale Inhibition Treatment. Returned well to production & obtained a valid production welltest. RECEIVED JUL 2 5 1994 Alaska 0ii & Gas Cons. Commission Anch0ra~e STATE OF ALASKA ALASKA'~''~ AND GAS CONSERVATION CC'--'~IISSION 8 [~ 16 IN t~ [ > REPORT SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E, UM 12. Present well condition summary Total depth: measured true vertical 5. Type of Well Development Exploratory Stratigraphic Service X REEEIVED AU G 7 1992 Alaska Oil & Gas Cons. Commiss'ton 9875 feet Plugs(measured) 9237 feet 6. Datum of elevation(DF or KB) 74' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Permit number/approval number 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool Effective depth: measured 9734 feet true vertical 9120 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 79' 20" 1990# Poleset 79' 79' Surface 2451' 13-3/8" 2400 sx Fondu & 400 sx PFC 2525' 2525' production 8942' 9-3/8" 500 sx Class G & 50 bbls PFC 9016' 8514' Liner 1173' 7" 325 sx Class G 9870' 9233' Perforation depth: measured 9640-9650'; 9654-9660' true vertical 9044-9050'; 9053-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657' MD; 4-1/2", 12.6#, N-80, PCT Tail @ 8754' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644' MD; Camco Bal-0 SSSV @ 2099' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 325 478 128 861 818 277 Tubing Pressure 216 229 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer iForm 10-404 Re[, 06/15/88 ~877/10 KRF cc: SW. JWP SUBMIT IN DUPLICATE 6-23 DESCRIPTION OF WORK COMPLETED DIESEL / XYLENE PERFORATION BREAKDOWN TREATMENT 5/15/92: RIH & tagged bottom at 9734' MD. 5/18/92: ^ Bailout Diesel / Xylene Stimulation was performed as follows: MIRU & PT equipment. Pumped the stimulation fluids fullbore, treating the perforations at: 9640 - 9650' MD (Z2) 9654 - 9660' MD (Z2) Ref. Log: BHCS 10/17/82. Pumped: a) 120 bbls Dead Crude @ 15 bpm, followed by b) 50 bbls Dead Crude w/200 ball sealers, followed by c) 240 bbls Dead Crude Displacement, followed by d) Shutdown. ISIP @ 2134. Surged well to unseat balls & resumed pumping: e) 60 bbls 50% Diesel / 50% Xylene @ 15 bpm, followed by f) 200 bbls Crude Displacement, followed by g) 30 bbls Diesel, followed by h) Shutdown. Rigged down. Returned well to production & obtained a valid production welltest. RECEIVED AU G Alaska Oil .& Gas O0ns. 'ADohorag STATE OF ALASKA / ALASKA'-'-. AND GAS CONSERVATION CC ~-'/IISSION ~t F~ I ~ J~ ~ [ REPORT SUNDRY WELL OPERATIO 1. Operations performed: Operation shutdown Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502, FSL, 271' FEL, Sec. 1, T10N, R14E, UM 5. Type of Well Development Exploratory StralJgraphic 6. Datum of elevation(DF or KB) 74' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Pej. mit number/approval number 82-1~_3 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 9875 feet Plugs(measured) true vertical 9237 feet Effective depth: measured 9929 feet true vertical 9199 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 79' 20" 1990# Poleset 79' 79' Sudace 2525' 13-3/8" 2400 sx Fondu & 400 sx PFC 2525' 2525' Production 9016' 9-5/8" 500 sx Class G & 50 bbls PFC 9016' 8514' Liner 1173' 7" 325 sx Class G 9870' 9233' Perforation depth: measured 9640'-9650'; 9654'-9660' true vertical 9044'-9050'; 9053'-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657'; 4-1/2", 12.68, N-80 PCT Tail @ 8754' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644'; Camco Bal-0 SSSV @ 2099' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure KI::L !' I V r'lJ MAR - 3 1392 Alaska Oil & Gas Cons. ComrnissiO[~ 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 235 1383 31 621 48 83 Subsequent to operation -- 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 Anchorage Tubing Pressure 1678 252 16. Status of well classification as: Oil x..~_ Gas .~. Suspended__. Service Date ~///C~ 7_..- SUBMIT IN DUPLICATE 6-23 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR GAS SHUT-OFF I 2/7/91: An acid wash & CTU Cement Squeeze for Gas Shutoff were performed as follows: MIRU CTU & PT equipment to 4500 psi. RIH w/CT & fluid packed the wellbore w/seawater, then immediately proceeded to pump the acid wash, treating the perforations at: 9540 - 9546' MD (Z2) 9596 - 9600' MD (Z2) 9616 - 9630' MD (Z2) 9640 - 9650' MD (Z2) 9654 - 9660' MD (Z2) Ref Log: BHCS 10/17/82. Pumped 57 bbls 15% HCI w/10% Xylene, followed by 57 bbls 12% HCI - 3% HF, followed by 70 bbls 3% NH4CI. Flushed CT w/1% KCI water in preparation for the squeeze. Proceeded to pump 34 bbls of latex acid resistive cement, squeezing the perforations (listed above). Followed the cement w/10 bbls of 1% KCl water, and opened the well for returns. Placed 17 bbls of cement behind pipe at 3500 psi max squeeze pressure, held for 1 hour. Contaminated cement w/biozan & jetted cement from wellbore down to 9807' MD. POOH. RD. I 2/1 7/91: Reperforated: 9640 - 9650' MD (Z2) 9654 - 9660' MD (Z2) Ref Log: BHCS 10/17/82. Returned well to production w/gas lift & obtained a valid welltest. RECEIVED MAR - 3 1,992 Alaska Oil & Gas Cons. Commission Anchorage ARCO ALASKA, INC. F'.O. BOX lO0360 ANCHORAGE, ALASKA 995t0 6 DATE' i 2-3t -9t REFERENCE' ARCO CASED HOLE FINALS RUN t , 5' RUN 3, 5' RUN t , 5' F:UN t, 5' RUN i, 5' RUN ",~ 5 ' RUN i , 5' PLEASE SIGN AND RETURN THE ATTACHED COF'Y r,~-4'v~ A Nib,-- .u, AY! SON. 'Y (~ wF:~i.. A TO- i 529 BUT I ON AF'F'ROVED T R l .i i"~ :'_.- ~- 9i CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS FIB WELL FILES R & D BF'X STATE OF ALASKA TEXACO * THE CORRECT AF'I$ FOR i-lB IS 50-029-2i~7-~t, ** THE CORRECT AF'I$ FOR 2-23ST IS 58-~29-2~795; ]'HERE IS NO SUF'F£X~ ATLA£ SCI4 HLS ATLA~ Al'LAS ATLAS RECEIVED dAN 10 1992 .Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ~ /~'"/ ~ ALASK,~-"LAND GAS CONSERVATION C( 'VIISSlON ~" REPORT uF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E, UM 5. Type of Well Development X Exploratory Straagraphic 6. Datum of elevation(DF or KB) 74' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Permit number/approval number 82-133 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9875 feet 9237 feet Effective depth: measured 9929 feet true vertical 9199 feet Casing Length Size Plugs(measured) Junk(measured) Cemented Measured depth True vertical depth Conductor 79' 20" Sudace 2525' 13-3/8" Production 9016' 9-5/8" Liner 1173' 7" 1990# Poleset 79' 2400 sx Fondu & 400 sx PFC 2525' 500 sx Class G & 50 bbls PFC 9016' 325 sx Class G 9870' 79' 2525' 8514' 9233' Perforation depth: measured 9540'-9546'; 9596'-9600'; 9616'-9630'; 9640'-9650'; 9654'-9660' true vertical 8958'-8963'; 9005'-9008'; 9022'-9033'; 9044'-9050'; 9053'-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657'; 4-1/2", 12.6~ N-80 @ 8754' MD. Packers and SSSV (type and measured depth)Baker SAB Packer @ 8644'; Camco BaI-O ;~,/¢¢i~1~ 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure M, ,R 15 i991 ~,Jas.~a.0Jl & Gas Cons. 60.mmissI0r~ ,, ;A.qch0raga 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2037 19891 0 -- 1962 11440 0 Tubing Pressure 1226 1401 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~E:::;2','/~~ Title Senior Area Engineer Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE.~ DS 06-23 ADD PERF PROCEDURE REPORT OF WELL OPERATIONS PROCEDURE WORK PERFORMED 02/16/91 1. RIG UP EJL AND TEST LUBRICATOR. 2. RIH WITH PERFORATING GUNS AND TIE IN TO REFERENCE LOGS. . PERFORATE INTERVAL 9540'- 9546' MD (BHCS 10-17-82) TO ATTAIN 4 SPF. POOH. 4. RD AND RELEASE E/L. 5. RETURN WELL TO PRODUCTION. ARCO ALASKA, INC~ ! ANCHORA(;F: A~._AE-':KA 99":i...' ;:~ o ,!. £ 'i" R ! B Li 7' ]: 0 N E X 'i" E [".i ,? i 0 N iii: X [. 'L. 0 i:.:.: A, i" i 0 N ii:- X X 0 Fi H A F.: A '1" i.-i 0 N H 0 B :[ L. MAI','. ', 199i ,~laska Oil & Gas t;uns. Commission Anchorage- ARCO ALASKA, T_NC, P,,O, BOX tOOS60 ANCHORA[;E, AI...ASK A DATE]' i -..8..-9 i Rli-"F:ERFNCE' AF;,'CO CASF.'"D HOLE FINALS i .... i'"'~:, t i--'2S. . .... 9(') CNL./PDK OVli:RL. AY RL.IN i, ':;'"..~. i .... iS tt .... 24 .... ':..;:'(') F'ORO$I'I"Y F'ROM I::'I) l< ".. RLIN t , 5" 6 .... 6 i,:. '-> -' ,.'.. ''~ ,~.::' '"' c.,. ~':~,, P Iii: R F: R E C_ ri.. R D R U N i , 5:" 6 .... i,:.-.~ ii .... 2 '.:5 --.. 9 ;'.'..;, I::'DK .... i6.;',~' DIFF~CuI:;.'.R,, .'S'I6i'-iA & I:.'ul',:¢ i,,'lJf,,! .... ~..t, i2 .... ,=i.--c~c;, ,, F:'ERF RECORD_ RUN i, ,'.,.-. 23 i i -.-".' ' ..-.°,':', . ._ · ,:..A ,.,, POF.'.ri.'.~ITY F'ROM PI)l< RUN 7--.iS i2.-.i(.)....9~ F:'Ii'$ RLIN i , .5" 9-8 i '2 .- 2'? -... 9 9 WAi'ERFI..OW I"D'F-I:' RUN c;,, .-.,-..'-~ 7 i ,.:.--."' 3. t - ~, (~ C C L R U N t , 5" i '=:...- ''> i t -.- t -.. 9" i C U l.. L (~ F,,' / P !.:' R F R U N ~ , 5" I::' I... E A $ r..i: S 16 N A N D !:;: E i' LJ I:;.: N 'f' I.'llii: A'T' l' A C.'.Fi E D C C.t P Y A S R E CEi. I P T O F:' I.:, A 'f' A/.~' R Iii] C !!--I V lED BY ~..~ ....... i-.lAVE A NICli!: DAY! SHARON WII..$ON A 'f' C'.'. .... i..,- ~... ";' ':' c,, A F:' P R 0 V E ;~~ "FRANS::: 9 i (:;,(')'? ¢)'l' L.A,.S ATI..A$ SCFI A I' I.. f::l,? A '1' I.. A;S' CAMCO · q' C H A'FL. AS A 'i'l_ ¢~..S' D ]: S 'f' F;,' .1: B L.I "l' I 0 N :,",:F' t"! I I_. [. :!: F:' £ F:'B W E L.I... I::' ]; I... E $ R & D :.": B F:'X ,'.S'T' A"I" E O F:' A I._ A S !< A "!" E X A E: 0 RECEIVED JAN 14 1991 Alaska Oil & 8as Oons. Commission Anchorage 4 6 ':.;:' ,' 4. "'; i 4 ,:' "? RECEIVED ,JAN ,9 199! Alaska Oil & Oa~ Cons. Commission An¢lorage ARC() ALA?.KA, INC~ F'~O. BOX ~6"3S6;D ANCHORAE-~E, ALA.?K A 99~ ~ ~ DATE~ ~'2-5-9~ RE '-i' ~ ' Al.?. C 0 F:ERb.',.,L'.E CA:",:ED HOLE FINAI_£' F' l..,J :5-2~ i i-4-9-':D PROD F:'ROFILE RUN 7.-26 t ;3,-.5i -9':'-:' F'ROD F'F,:OFiL_E RUN '~ .... C:OLLAR/PERF RUN · ..,-z o i i-22,-9'3' , 6-i "'-; ~ i -"~= o;:, F'DK '~ ;--;;:;/GR/CCL RUN · _. ~ ~"_ ._:. ~ · ..- ~ ~ ..- ._. 6-23 i i -26-90 F'DK-i O0/GR/'CCL RUN 7-9 i i-.5-9,.'::, F'I T$/i:F'.[NNF-R RUN 7-- 2 '" i i - o o ,.. · _-, ~4-- ,- ,'--; COLLAR/F'ERF RUN I i-4 I i-4-9,:D F'ROD PROFILE NUN t i-2, t i-5--..°-0 F'ROD PROFZt_E RUN ii-t i i i-3-9,':" F'ROD PRdFfLE RUN t 3-6 i ,.'.-':,-3i -90 HI,S'C GA,S' IN.J F'F;.'.OFILE. RUN i--,'*.-- ~, _,. ~'-' ~,i -'=--':;',':',.... , .. pn'Or), ,. ._ F'ROFiI_E F;..'U N i Y:;--4 ! i--.25:-90 VERTiLOG RUN i 6--i '-7--' i ;,:;,-.5i -":;'¢, COL_LAR RUN 4, ",."--'7 i i--".~-q';'-"-'._. :., F'~:';i~;.,...,.. _,. PROFZLE RUN t '7---9 i i-.5-9,:.":, PROD Pi:;:OFZLE RUN i ,-'-i i t '~ -"-~-~,':; F'RFif'~ F'F.:OFT,_,.- r-.'UN t 7-i 2. i i -S-9,:D PROD F'F,'OFILE RUt'! DW!-2A i 'i _-.::,:=:_ c;,;:-, COLLAR/PERF RLIN s::,i EAZE ;":-:iGi"4 AND RETURN T~-i,:' ,-'-.~--".:"~..,~:'"", , ......... ~-i , I ~.~ ....... D C 0 F:' Y A S' R ~:. C E .[ F:'"r 0 F' f) A 'i" A HAVE A NICE DAY! ZALLY HOF"FECI<ER APF'ROVEi) Aq--O_,i .~--, , ...... , _,,:-.9 "J" p/.:, ~,..i ~: :,.: C A M r; 0 C' R r.i C 0 A EL. AZ A 'f L A S' A'f'L. A3: CAf'";u 0 A 'f'L A ,'_';.' C A H C 0 CAi,iCO CAH~S:O C A r-i C 0 A i" L. A J-.)' C A ,,".~ C -',] CAMCO C A H C 0 CAMCO DISTRIBUTION CENTRRL FILEZ , F'HILLIF'£' CHEVRON PB WELl_ I::IL. ES' D *,_., M R & D EX]E.N$ION EXF'LORA'f'ION ~ BPX E:XXON ~ ,S"TA] E 01::' ALA,S'K A MARATHON TEXACO MOBIL RECEIVED DEC 7 Alaska Oil & Gas C:,ns. Comm/ssior, Anchorage AR(::() ALAZKA: '!NC. P,. 0 ~ BOX i ,.'.:.-~C')~:6E:' ANCHOF:.AGE: ALASKA 99:}~ 'i E) DATE' i 6,-i 8-96' REFEF'-..:ENCE' ARCO C'ASED HOLE F'ZNAL,S F'LEAS'E ..':£i(;N AND F.:ETUF.:N THE Ar'TACH. ED COF'Y F...'EF':E ]:"'.,"F'T.', .... ,.,~"--", .~~1,~__ ~ HAVE A NIC'F DAY! ;SALLY FiOFFECKER AT()'- 'i 5:29 A~_...~ RECEIF'T OF DATA, AF'F'i:~:OVi£D .......... 'f'RA Ni:-'~ 9~'~ HL $ H L:i.T 1.4 L.. :S i--i i._ ~i: i-.t :._ ?~ L..'"-,"' ,ui, [_ H, L ,'~; l-*i L :'::: H L;S' D ]: $ T R i.,., u , J.x~' ~ "' "O N · ~- '"' I.-- i' j 'T F,, 1:." T ! I:: :-'-," i.., .,. Ai_ ,,-:HEVr4'nN D & M EXTE:NST ON EXF'LORA'FI ON EXXON MARATHON ~ HOB]iL F'HILLIF'~; F'B WELL F']:LE.":',' i;, ~ D BF'X :".~.TATE OF F~,LAZ';'I'.'..'A TEXACO RECEIVED OCT 1 9 1990 ,~¢aska 0il & Gas Cons. CommisSion Anchorage STATE OF ALASKA ALASK/~'~"L AND GAS CONSERVATION C~ VlISSION 0 REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 12, T10N, R14E, UM At effective depth At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 74' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Permit number/approval number 82-133 / 90-608 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9875 feet 9237 feet Effective depth: measured 9929 feet true vertical 9199 feet Casing Length Size Conductor 79' 20" Surface 2525' 13-3/8" Production 9016' 9-5/8" Liner 1173' 7" Plugs(measured) Junk(measured) Cemented Measured depth True vertical depth 1990# Poleset 79' 2400 sx Fondu & 400 sx PFC 2525' 500 sx Class G & 50 bbls PFC 9016' 325 sx Class G 9870' 79' 2525' 8514' 9233' Perforation depth: measured 9596'-9600'; 9616'-9630'; 9640'-9650'; 9654'-9660' true vertical 9005'-9008'; 9022'-9033'; 9044'-9050'; 9053'-9058' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 8657'; 4-1/2", 12.64f N-80 @ 8754' MD. Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644'; Camco BaI-O SSSV @ 2099' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaqe Production or Injection Date .~' '~'~: '~',.: OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1484 9719 71 1461 16833 0 Tubing Pressure 884 1744 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~2-~,~~~ ~ Title Senior Area Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DS 06-23 ADD PERF PROCEDURE REPORT OF WELL OPERATIONS WORK PERFORMED 08/31/90 1. RIG UP E/L AND TEST LUBRICATOR. 2. RIH WITH PERFORATING GUNS AND TIE IN TO REFERENCE LOGS. , PERFORATE INTERVAL 9596'- 9600' MD (BHCS 10-17-82) TO ATTAIN 6 SPF. POOH. 4. RD AND RELEASE F_/L. 5. RETURN WELL TO PRODUCTION. 1. Type of Request: Repair well Alter casing Change approved program Pull tubing 2. Name of Operator ARCO Alaska, Inc. Plugging ~... STATE OF ALASKA .__.. ALASK,Z L AND GAS CONSERVATION C(' MISSION APPLICA I'ION FOR SUNDRY Abandon Suspend Operation shutdown Re- enters u s~en e~ed ~e ,, J _~ Time extension Stimulate 3. Address P.O. BOX 100360, Anchorage, AK 99510-0360 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM At effective depth Variance At total depth 2502' FSL, 271' FEL, Sec. 1, T10N, R14E,UM 5. Type of Well Development Exploratory Stratigraphic Service Perfor,~te X Other __ 6. Datum of elevation(DF or KB) 74' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 6-23 9. Permit number 82-133 10. APl number 50 - 029-20808 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9875 feet Plugs(measured) 9237 feet Effective depth: Casing Conductor Sudace Production Liner Perforation depth: measured 9929 feet true vertical 9199 feet Junk(measured) Length Size Cemented Measured depth 79' 20" 1990 # Poleset 79' 2525' 13-3/8" 2400 sx Fondu + 400 sx PF 'C' 2525' 9016' 9-5/8" 500 sx 'G' + 50 bbls PF 'C' 9016' measured 9616'-9630'; 9~0'-9~0'; 9~4'-966~'1,.,. ~ 0 8 ]~0 22 ..... '~~'~ ~~ trueve,i~l 90 -9033; 90~-9050; 9053-9058 ' ~ ,._. --.~~~ Tubing (size, grade, and measured depth) 5-1/2', 17#, L-80 PCT @ 8657'; 4-1/2", 12.64t N-80 @ 8754' MD True vertical depth 79' 2525' 8514' 9233' Packers and SSSV (type and measured depth) Baker SAB Packer @ 8644; Camco BaI-O SSSV @ 2099' MD. 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation 8/90 16. If proposal was verbally approved Oil X Name of approver Date approved = Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~-~'~J~ Title 15. Status of well classification as: Gas Suspended Senior Area Engineer Date FOR COMMIRRION H~l= ONLy Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test . Location clearance Mechanical Integrity Test Subsequent form required 10- 0RIGINAt. SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 06-23 Perforation Proposal ARCO Alaska proposes to perforate within the Sadlerochit formation of the Prudhoe Bay Unit in well 06-23. The proposed intervals are shown below. Ref: BHCS 10/17/82 .Interval, 'MD Interval, 'TVD Intervi!l, 'SS Zon~ 9596- 9600 9005 - 9008 8931 - 8934 2 This work will be done with formation fluids in the wellbore. All wireline work will be done through a 5000 psi working pressure BOP/lubricator, tested to 1.2 times the maximum expected surface pressure. RECEIVED ,AUG o.81990 Alaska Oil & Gas Con;, Commission Anchorage ~ 4 2 COIL£D {tJ~l~ UNIT BOP EOUZ PHEm ¶. ~ PSi ?" V~LLH~ ~CTOR £LANO[ 2. ~)00 PSI 4 1/16" PIP£ ~ 3. ~)00 PS1 4 1/~" HYD~IC ~LIP$ 4. ~)00 PSi 4 1/6" SHr. AR RAMS 5. 5000 PSI 4 1/6" BLIND RJ~ 6. 5000 PSI 4 1/16" STUIrlrl~ BOX 4 H]RELINE BOP EOU]PHENT i i ! 1. 5000 P.~I ?" W[LLH[AD CONN[C10R IrLANG[ 2. 5000 PSI WIR[LIN[ RAMS (VA, RIABL[ 3. ~)00 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUB[ PACK-Orr bcc: M. L. Bill, ATO 1550 M. M. Maguire, ATO 1554 Sally Hoffecker, ATO 1529 PI(DS 6-23)W1-3 Distribution' J. Gruber, ATO 1478 T. B. Gray, BP Exploration, Anchorage P. L. Smith, Exxon, Houston [) r:':'~ ~" E ' 2! ..... i 4-"':? 0 F:' F;.: 0 b LI C 'f' Zi: (3 N i::' F;.: C! i" ZIZ'l... Iii: F:' F;: C) :(.'.', U C 'f J: iL:) N F:' I.;.'. L:! F:' ;1: I... iii: ;" F;/' '"" ~:: ;,4 n, ~..'1'I I,.,I !1 F:' F;..' C:! :0 t.J C 'i':[ C) i',! F:' F;.: iT)F:' :l: i._ E F:' i:;..' I~) ;0 I..J (;; 'T' .'J; 0 J'--.! .? J:;..' (;)l::' ]; I... F:' F;: O L':' U (3'f' ;i: C.i ia! F:' F;.:/.:) F:' :i: L. ii:' F:' F;.: C) .f.) U (:.'.' 'f' .1; (3 N F:' I:;.: (3 l::' ;i: I... iii; F' 1:;',' O ;0 t.J C'f' ;I; (] N F:' F;,' (;} F:' :1; i... iE F:' i:;.: 0 .f.) t.J C "1" ]; C;~ N F:' i:':.: {:)I::' ;I: i... F:' F,' [;] ;(.':' U [:; 'f' :!; C) N F:' 1:;.: (:)I:: :1: i... !.:.': ' 2 ? 15:' 0 _._ r::: T' 0 .... i .......... ,:.'.' .":. c. ..:t~dSt,'~., : 4~r (¢ ,,, ~'q' 'i-F:.: ¢:'~ N.,..,*" :~: 9 0 ,e.; ;5 4 Ancho,..~g¢. . ,. :0 ]: ~-.' T F;.: ]: }3 t..i 'f' ]: C) N C F'~ I"i t.; 0 ~ ' i'::i l'"'i I' :! "i !..: f'.':i I""1 i...: i...f (.:: r::i I'"i (.; L) iL;; r:':i f"'l C ........ ,....' ' i'::i I'"J t..-' t..i (;;: r::i I"': i.;'; ........... t..: f::l ('"i t..: t..I (L; r::'~ i"'i (Z; .,."-'.. STATE OF ALASKA ALA~ OIL AND GAS CONSERVATION COb,. .$SION REPORT OF SUNDRY WELL OPERATIONS 1. Operation§ performed: Operation shutdown [] Stimulate,J~ Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other ~ 2. Name of Operator ARCO Alaska, Inc, 3. Address P.O. Box 100360. AnchOraKe, AK 99510 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, Tt0N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 2, TION, R14E, UM 5. Datum elevation (DF or KB) 74' RKB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 6-23 8. Approval number 7-431 At effective depth At total depth 2502' FNL, 271' FWL, Sec. 11. Present well condition summary Total depth: measured true vertical 1, T10N, R14E, UM 9875' feet 9237 ' feet 9. APInumber 50-- ~2q-?~8~8 10. Pool Prudhoe Bay Oil Pool Plugs (measured) Effective depth: measured true vertical Casing Length Structural Conductor 79 ' Surface 2525 ' Intermediate Production 9016 ' Liner 1173' Perforation depth: measured 9929' feet feet 9199' Size Junk (measured) Cemented 20" 1990# Poleset 13-3/8" 2400 + 400 Sx Measured depth True Vertical depth 79' 79' 2525' 2525' 9-5/8" 500 Sx + 50 bbls PF'C' 9016' 7" 325 Sx 9870' 8514' 9233' 9616-9630'; 9640-9650'~ 9654-9660' true verhcal 9022-9033'-, 9042-9050'; 9053-9058' ~bing(size, grade and measured depth) 5½", 17#, L-80, PCT @ 8657'; 4½", 12.6#, N-80 @ 8754' MD Packers and SSSV(type and ~easured depth) Baker SAB Packer @ 8644' MD; Camco Bal-O SSSV @ 2099' MD 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Prior to well oPeration Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl 1286 1766 0 Casing Pressure 1581 2489 0 Tubing Pressure 720 657 14. Attachments Daily Report of Well Operations .,~ Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~::fl~~..~~~./~ Title ~)~ ~ /~'~/Z-, Form 10-40-4 Rev. 12-1-85 WELL$/1UI T. P. Alien, 2b~-4~37 Submit in Duplicate DRILL SITE 6-23 DESCRIPTION OF WORK PERFORMED Treatment: Mud acid stimulation Date: 3/13-14/88 Zone Treated: lB and 2 1. Performed emulsion and sludge test on an oil sample taken from DS 6-23. 2. Tested well prior to the stimulation. 3. Rigged up coiled tubing, pump truck and transports. 4. Ran in hole with coiled tubing and inflatable packer. 5. Tie-in to DB-6 nipple and set packer 9608' MD. 6. Mixed all acid systems and dispersed with xylene. Titrate to verify all acid concentration. Test for iron content. 7. Pumped the following Stimulation fluid down the coiled tubing: a. 35 bbls of 12% HCl dispersed with 20% xylene w/additives b. 66 bbls of 6% HCl-l.5% HF with 20% xylene w/additives c. 45 bbls of 2% NH,C1 d. 24 bbls of diese~ with 10% EGMBE e. 25 bbls of diesel 8. Release packer. POH with coiled tubing and packer. 9. Immediately place well on production. 10. After all stimulation fluids have been recovered, obtain new capacity. WELLS/101 ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 5, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas C~nservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: ~.8~:6,23~ Approval No. 7-431 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-]478 Pi(DS 6-.23)W1-3 WELLS / 10 t STATE OF ALASKA ALA, -~ OIL AND GAS CONSERVATION CON .SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate ,MI Plugging [] Perforate [] Pull tubing [] Alter Casing ~ Other [] 2. Name of Operator ARCO Alaska, [nc 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. At effective depth 2, T10N, R14E, UM 5. Datum elevation (DF or KB) 74' RKB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 6-23 1, T10N, R14E, UM 8. Approvalnumber 7-431 At total depth 2502' FNL, 271' FWL, Sec. 11. Present well condition summary Total depth: measured 9875' feet Plugs (measured) true vertical 9237 ' feet Effective depth: measured 9929' feet Junk (measured) true vertical feet 9199' Casing Length Size Cemented Measured depth Structural Conductor 79' 20" 1990# Poleset 79 ' Surface 2525' 13-3/8" 2400 + 400 Sx 2525' Intermediate Production 9016' 9-5/8" 500 Sx + 50 bbls PF'C' 9016' Liner 1173' 7" 325 Sx 9870' Perforation depth: measured 9. APInumber 50-- ~2q-?~R~R lO. Pool Prudhoe Bay Oil Pool 9616-9630'; 9640-9650') 9654-9660' true verhcal 9022-9033'', 9042-9050'; 9053-9058' ~bing(size, grade and measured depth) 5½", 17#, L-80, PCT @ 8657'; 4½", 12.6#, N-80 @ 8754' MD Packers and SSSV(type and ~easured depth) Baker SAB Packer @ 8644' MI); Camco Bal-O SSSV @ 2099' MD True Vertical depth 79' 2525' 8514' 9233' 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 4,/aska Oil & Gas Cone' 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl 1286 1766 0 Casing Pressure 1581 2489 0 Tubing Pressure 720 657 14. Attachments Daily Report of Well Operations j~ Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~~,,~~ Title ~ ~ /¢~'~, Form 10-404 Rev. 12-1-85 WELLS/lO1 T. P. Allen, 2b~F-4837 Submit in Duplicate DRILL SITE 6-23 DESCRIPTION OF WORK PERFORMED Treatment: Mud acid stimulation Date: 3/13-14/88 Zone Treated: lB and 2 1. Performed emulsion and sludge test on an oil sample taken from DS 6-23. 2. Tested well prior to the stimulation. 3. Rigged up coiled tubing, pump truck and transports. 4. Ran in hole with coiled tubing and inflatable packer. 5. Tie-in to DB-6 nipple and set packer 9608' MD. 6. Mixed all acid systems and dispersed with xylene. Titrate to verify all acid concentration. Test for iron content. 7. Pumped the following stimulation fluid down the coiled tubing: a. 35 bbls of 12% HC1 dispersed with 20% xylene w/additives b. 66 bbls of 6% HCl-l.5% HF with 20% xylene w/additives c. 45 bbls of 2% NH,C1 d. 24 bbls of diese~ with 10% EGMBE e. 25 bbls of diesel 8. Release packer. POH with coiled tubing and packer. 9. Immediately place well on production. 10. After all stimulation fluids have been recovered, obtain new capacity. WELLS/lO1 ARCO AL.A~KA, F'.,O~ BOX ANCHORAGE, AI_ASKA 99~t~ DATE' REFERENCE' ARCO CA~ED HOI...E F~NAi... 3-8 5-~ ~O-~-R7 6-~ o oR 6-8 ~ 0- t -87 6-!7 9-24-87 6-22 ~0-~-87 6-~? 9-5 1~-8-87 9-S4 F'LEAXE ~ - COI..I_AR/PERFORAT~ON Cf~I..[.A~/F'FRFORATTON COI._I...A~/F'ERFORATTO~ C~t.t..AR/PERFR~ATTON COI_.[..A~/PERFORATION C~I..t..AR/PERFORATION CO!__I...A~/PERFO~ATION coLLAR/PERFORATION COI...!...AR/F'ERFORATION COt..I..AR/F'ERFORATIOM CO1...I...AR/PERFORATIO~ COI..I...AR/PERFRRAT~OW COi..!...AR/PERFORATION 0-24-87 AND R~ R'IJN RUN RI.IN R! IN !:;.'.! IN R'! IN E'I.JN RUN RUN I~I..IN TF'T F!F .OATA,. PEGGY BENNETT ATO- i 529 TRAN,_t' '°°t AR . '-~,~ mP~._~ ... APPR.()VED .¢ ~-~ D!~TRI~t. ITTON %'11 5" 5" CENTRAL_ FIi...E~ CHEVRON D & M EXTEN~,ION EXF't. ORATION EXXON MARATHON MOBIl_ PHI I...I... !' P,.~ PP, WELL FTt E~ R & ~ ,.gAF'C ,.~TATE OF AI...A,.gKA TEXACO ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January- 4, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 6-23 Permit No. 82-133 Dear Mr. Chatterton: Attached is the Application for Sundry Approval performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/PVL/jp Attachment cc: Standard Alaska Production Company Pi(DS 6-23)W1-3 detailing work to be RECEiYED Oil & ~as Cons. CommissBn Anchorage WELLS/101 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASK,. OIL AND GAS CONSERVATION COMM. ~,:;ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [~ull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator ARCO Alaska, 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM At effective depth At total depth 2502' FNL, 271' Y-t,,~, Sec. 5. Datum elevation (DF or KB) 74' REB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 6-23 8. Permit number 82-133 9. APl number 50-- 029-20808 10. Pool 1, T10N, R14E, UM feet Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 79' 20" 2525' 13-3/8" Surface Intermediate Production 9016 ' 9-5/8" 1173' 7" Liner 9875' feet 9237' feet 9929' feet 9199' feet Size Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth 1990# Poleset 79' 79' 2400 + 400 Sx 2525' 2525' 500 Sx + 50 bbls PF'C' 9016' 325 Sx 9870' Perforation depth: measured 9616-9630'; 9640-9650'; 9654-9660' true vertical 9022-9033'; 9042-9050'; 9053-9058' ~bing(size, grade and measured depth) 5½", 17#, [-80, ?CT @ 8657'; 4½", 12.6#, N-80 @ 8754' MD B~acke~.~n~SS~V(ty~e.a~p,~e~ure~ depth)~ . . a~er b~ ~ac~er ~ ~u~ mu; ~amco ~a±-u SSSV @ 2099' MD 12.Attachments 8514' 9233' Description summary of proposal '~, .... ~ Oil & Oas Cor~s. C0mmissi0. Anchorage Detailed operations program D BOP sketch 13. Estimated date for commencing operation January 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby/~ertify that.tJpe foregoing is true and correct to the best of my knowledge Signed ,~¢~'/~~f~;~~ -----'- Title Operations Engineering Manager Date /~/,?"~' Commission Use Only Conditions of approval Notify commission so representative may witness I ApprovaINo. ~ ~)~--~ [] Plug integrity [] BOP Test [] Location clearanceI Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Approved Copy Returned C~ Commissioner by order of the commission Date / '~, -"~:~-'~ Form 10-403 Rev 12-1-85 WELLS/101 P. V. Lantero, 263-4312 Submit in triplicatu 4 2 COlLEO TUBII~ UNIT BC:)P EOUIPHENT, Drill Site 6-23 Selective Stimulation PROCEDURE I · . . · . . . . . 10. 11. 12. Obtain a wellhead fluid sample from well 6-23 and perform emulsification and sludging tests with all stimulation fluids (tests should be performed with 13.0% HCI and 7%HCl-2.4%HF at a ratio of 80% acid to 20% xylene). Add non-emulsification and anti-sludging additives as necessary to ensure no downhole emulsions or sludges are formed. Obtain a valid well test at a choke setting of 45°. Contact the Drill Site Engineer concerning any questions about the well test. MIRU wireline unit. Make a gauge ring run (3.60" gauge ring should be run on the end of a 20' foot dummy gun) and record PBTD. MIRU pump trucks, CTU :and transports. Before running in hole with CTU, pump the 'set ball' through the CTU to make sure the unit is free of restrictions. RIH with tubing tail Iocator, Baker 7" inflatable packer, and hydraulic disconnect. Using the CCL log (dated 9/17/87) as the correlative log, set the packer at 9608' MD. Load 1500 gals of the dispersed 12% HCl/xylene system (i.e. B J/Titan's One Shot Acid, Dowell's DAD (U74) Acid, Halliburton's PAD Acid) and 3000 gals of the dispersed 6% HCl- 1.5% HF/xylene system. The dispersed system should be mixed in a ratio of 80% acid/20% xylene (1200 gals 12% HCl/300 gals of xylene and 2400 gals/ 6%HCI-1.5%HF/600 gals of xylene). Roll all acid compartments before pumping fluids downhole. Stimulate the well as follows: A. B. C. D. E. 1500 gals of 12% HCl dispersed with xylene w/additives 3000 gals of 6% HC1-1.5% HF dispersed with xylene w/additives 2000 gals of 2% NH4Cl water w/additives 1000 gals of diesel w/10% EGMBE Displace with 25 bbls (CTU volume) of crude or diesel Release inflatable packer; pull packer above PBR assembly before bringing well back on production. Establish production. If well does not flow, begin to N2 lift with the CTU. RD and release CTU, pump truck and transports. Test well for new capacity and put into test 24 hours after job is completed at a choke setting of 45°. Contact Drill Site Engineer concerning any questions about the well test. 995 ~ 0 F:' i ¥'~ a I At I. a .s' A t I.a..'.~ At I. a .s' A't Atlas A T I. m fr F:'l. eos'e ~-';ign and ¥'e't'u'r'n 't'he a 'l: 'l: a ,.':'. h ed .r.:opy a.s' rec. eip't of da'l:.a,. ........................................ ' NOV - 1987 FIAVE A N.T.C[:_' DAY! /' / ~ ~$ka Oil & 6as Cons. C0mmissl0~ · R .¢...-, c o r r.I .s' F:' r c, c e s' .'.-.~' o ;- Anchorage A'f'O- t 5°9,:.. " A p I:.~ t" 0 v e d ............................... D I ,.¢.,, T R I B U 'f' ! f:.l N ,,.-'~r;.. e. 'r', +. 'r' a 1. I::' i I. e .s' .I,~. P h i I. I. i p ~ ~ C'.h ¢-:, v'r' o n P P., W e I. !. F i I. e s' l) & f,I R & I) ,. f.!: x T e n..--:., i c, ~",, E x p !. c, r' a '!.' i o n 4: ..¢,, A F' C · .,. ¢, . ol? A I.a.s'ka ~: F:' x x o n ,~ ,., -I:. a T e t'i ,?: r a t' h o n 4: T e x a c o · "' Mr',l:.~ i I · ~- ... ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager July 1, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 6-23 Permit No. 82-133 Dear Mr. Chatterton: Attached is the Application for Sundry Approval performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JLB/jp Attachment cc: Standard Alaska Production Company Pi(DS 6-23)W1-3 detailing work to be RECEIVED JUL - 2 ]987 Alaska 0il & Gas Cons. Commission Anchorage WELLS/101 ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany STATE OF ALASKA ALASI~,A OIL AND GAS CONSERVATION COM,.:,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order ' Perforate ~ Other 2. Name of Operator ARCO Alaska, 'rnc. 3. Address P.O. Box 100360~ Anchorage, AK 99510 4. Location of well at surface 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM At top of productive interval 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM At effective depth At total depth 2502' FNL, 271' FWL~ Sec. 1~ T10N~ R14E, UM 5. Datum elevation (DF or KB) 74 ' ~B feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 6-23 8. Permit number 82-133 9. APl number 50-- f'l? q- ? f'lRf~R .. 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured 9875' feet Plugs (measured) true vertical 9237 ' feet Effective depth: measured 9929' feet Junk (measured) true vertical feet 9199' Casing Length Size Cemented Measured depth Structural Conductor 79' 20" 1990# Poleset 79 ' Surface 2525' 13-3/8" 2400 + 400 Sx 2525' Intermediate Production 9016' 9-5/8" 500 Sx + 50 bbls PF'C' 9016' Liner 1173' 7" 325 Sx 9870' Perforation depth: measured 9560-9650' (3 intervals) true vertical 8974-9049.9' (3 intervals) Tubing (size, grade and measured depth) 5½", 17#, L-80, PCT @ 8657'; 4~", 12.6#, N-80 @ 8754' MD Packers and SSSV (type and _measured depth) Baker SAB Packer @ 8644' MD; Camco Bal-0 SSSV @ 2099' MD True Vertical depth 79' 2525' 8514' 9233' RECEIVED JUL - 2 ]987 Alaska OJJ & Gas Cons. Com..m..~ssion 12.Attachments Description summary of proposal [] Detailed operations program ~1Ct1~6;¢)sketch 13. Estimated date for commencing operation 14. If proposal was verbally approved Name of approver July 1987 Date approved 15. I hereby/c<'Crtify that thc, lfore~oing i~ true and correct to the best of my knowledge I/ '711f/fl Signed ~ O~~/' ¢~'~ Title Operations Engineering Manager Commission Use Only Date Conditions of approval N otifycommissionsorepresentativemaywitness I Approve INc. [] Plug integrity [] BOP Test [] Location clearance ,/~'--- Approved by Form 10-403 Rev 12-1-85 WELLS/101 .... __~.. .... Z¢-' .... by order of Commissioner the commission Date ~. %. ~=ad~, 263-4245 ~/~ Submit in triplicate DS 6-23 CTU CEMENT SQUEEZE FOR GAS SHUT-OFF PROCEDURE 1. Add perforations in the interval 9654-9660' MD (reference log BHCS 10/17/82). Produce well to allow perfs to clean up. 2. Perform pre-squeeze acid wash and produce well to ensure perfs and channel are clean. 3. RU coiled tubing. Fluid pack wellbore. 4. Pump 20 bbls cement, squeezing existing perfs. 5. Contaminate cement. 6. WOC. Reverse out contaminated cement. 7. Reperforate 9616-9630' MD, 9640-9650' MD and 9654-9660' MD (reference log BHCS 10/17/82). 8. Return to production and obtain new capacity. Evaluate the well for stimulation. 9. If the well fails to make adequate rate after stimulation, reperforate the interval 9596-9600' MD and add perforations 9600-9608' MD (reference log BHCS 10/17/82). RECEIVED JUL - 2 Alaska Oil & Gas Cons. Commission Anchorage 7 JLB2/109 5 4 3 2 I 1 I 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX RECEIV D JUL. ,-~ 2 ].~87 Alaska Oil ,~ Gas Cor~s. Oornmkssion Ancl~orage COILED TUBINI~ UNIT BOP EQUIPMENT REV.[ 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) .3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4- 1/6" FLOW TUBE PACK-OFF I 1 , I RECEIVED JUL. Alaska Oil & Gas Corls. Oommissior, Anchorage N I REL I NE BOP EQU I PMENT ARCO Alaska, Inc. P.O. Box 10036(} Anchorage, ALaska 995t(} DATE: Hay t3, t987 REFERENCE: ARCO Cased HoLe Final t -28 4-22-87 2-8 4-t3-87 3-9 4-t(}-87 .3-22 4-i 5-87 3-22 4-29-87 · ~-25 4- t 5-87 3-25 4-t 6-87 4-t 7 4-t i-87 6-~'~,,..-- 4-t9-87 6-23 4-2e-87 9-4 4-22-87 9-6 4-3-87 9-28 4-~ 6-87 ~ ~-~ 4-2~-87 ~ ~ -~ e 4-~ 7-87 J ~-~ 5 4-~ 8-87 ~ 3-2~ 4-2~-87 ~3-25 4-25-87 ~3-32 4-~ 9-87 ~ 4-2Q 4-5-87 ~4-35 4-6-87 ~ 6-24 4-6-87 ~8-2- .4-~2-87 ~8-8 4-~-8 r F[ow;neter/CCL Run t, Leak Det./Temp/FLowmefer Run t, Leak Det. Run t, FLuid I.D./GR/Temp I~ I~ FLop. F'.L.(CCL/GR/Te~np) Run t, F [ow~efer/GR Run ~, F'ul,~p in Te~np. S~rvey Run ~, In j. Profi[e Run ~, F[op.P.L.(CCL/GR/Te~np) Run ~, F [op.P.L. (CCL/GR/Te~np) Run ~, CoL[ar Log (se~ bridge plug) Run ~, CoLLar & F'erf. Log Run ~, CoLLar Log(~e~ AVA &DW pack) Run ~, F'rod. Profi [e/FLow/FLuid I.D Run ~, F [op.F'~L. (CCL/GR/Te~np) Run ~ , F [op.F'.L. (CCL/GR/Te~np) Run ~ , Inj. Profi [e/F[ow~ne~er Run ~, Inj. F'rofi [e/F[ow;ne~er Run ~, In]. F'rofi [e/FLow~neker Run ~, CH CNL Run S, CH CNL Run ~, F [op.F'.L. (CCL/GR/Te~np) Run 2, F[owme~er/Te~np/F[uid Density Run ~, F[owmefer/F[uid Dens[fy Run ~, PLease sign and/X~ettl~De.~l~e./~_f_tached copy as rece No~m nne '~ee k ~C-~Ol'8om · ATO-f 529 --' 'FRAN.9 .~872L~7 .~ Approved __ DISTRIBUTION 5' 5" 5" 5' 5' 5' 5" 5" 5" 5" t" 6,5' 5" 5" 5" 5' 5' 5" 5" 5" 5" 5" 5" ip~ of data. Ca fdC 0 C a f~! C 0 Ca CdC 0 $ch Ca,,)co ~-' Cafdco "' ',~ ~ch ' ~ ~ch Gear Gemr Gear C 8 ~tc o ~ch ~ch Ca mc o C 8 hl c o C8 fdc o ~ch ~ch ,~ch Ca ~c o Cent'rm L Fi Les; Chevron D & M Extension Exp lora'i' i on Exxon Harm ~hon Hob i ~ Phi LLips F'B WeLL Fi Les R & D ARCO Alaska, Inc. ~--~. Prudhoe Bay ~ineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer September 27, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 6-6 DS 6-11 DS 6-12 DS 6-14 DS 6-20 DS 6-23 Permit No. 76-20 Permit No. 79-110 Permit No. 80-29 Permit No. 80-31 Permit No. 80-124 Permit No. 82-133 Enclosed are the Well Completion Reports detailing work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS:JEB:cmr Attachment CC: SOHIO Alaska Petroleum Co. File Pi(DS 6-6)Wl-3 P1 (DS 6-11)Wl-3 Pi(DS 6-12)Wl-3 PI(DS 6-14)W1-3 Pi(DS 6-20)Wl-3 PI(DS 6-23)Wl-3 RECEIVED SEP 0 19115 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA --~--, ALASKA _ ,L AND GAS CONSERVATION O~ ,MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARQD Alaska, Inc. 82-133 3. Address 8. APl Number Post Office Box 100360, Anc_l~rage, AK 99510 50-029-20808 4. Location of well at surface 9. Unit or Lease Name 702' FSL, 1010' FEL, Sec 2, T1CN, R14E, ~ Prudhoe Bay Unit At Top Producing Interval 10. Well Number 2507' FSL, 33' FEL, Sec 2, T10N, R14E, LI~ DS 6-23 At Total Depth 11. Field and Pool 2502' FNL, 271' FWL, Sec 1, Ti(~, R14E, f.~ Pruc]hc~ Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ~:~ ~ Oil 74' RKBI ADL 28311 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 10-1-82 -10-18--82 10-24-82 IN/A feet MS L 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey /20' Depth whereSSSV set I 21. Thickness of Permafrost 9875'MD 9237TROD c. ~29'MD 919gIVD YESk~ NO []'~aipple~2093 feet MDI 1900' (apprcix.) 22. Type Electric or Other Logs Run DTT,lSP/BFf~iGR, FDClCNL/GR/Cal, CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# {-40 Surface 79' 30" 1990 ff 13-3/8" 72.0~ ~-80 Surface 2525' 17~" 2400 sx FQndn & 400 sx Pear,a frost C 9-5/8" 47.0# ~-80/ Surface 9016 ' 12¼" 500 sx Class G & 50 hb].~ ~e~maCrr~.qt-_ ~00-95 7" 29.0# ~-80 8697' 9870' 8~" 325 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. IUSING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9616-9630' tVD 4SPF 5%" R754' * 96~0-9~50'~) ~ 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED * ~ C~ 8-24-85 . TVD of Perfs: 8975-9050' 27. : PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 5-1-83I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OILRATIO 5-19-83 6.2 TEST PERIOD ]~ 684 213 4 55°I 5Pr1 Flow Tubing Casing Pressure CALCULATED.1~ OIL~BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 772 N/A 24-HOUR RATE "~' 2669 1387 0 27.0 28, CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sadlerochit Orig. G/O Contac G/CC moved to Sase Sad~itii GEOLOGIC IV, AR K ERS FORMATION TESTS Include interval tested, pressure da~a. MEAS. DEPTH TRUE VERT. DEPTH ' GaR. and lime at each phase N/A 31. LIST OF ATTACHMENTS 9130' 9176' 9250' 9660' 9683' 9783' 8652' 8715' 9058' 9078' 9161' 32. I hereby certify that the foregoing is true and correct to the best of my knowledge S,9ned - Title Dale __ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item. 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". ARCO Alaska, Inc. Post Office Be,. 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 19, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 6-20 DS 6-14 DS 6-11 DS 6-12 DS 6-6 DS 6-23 Permit No. 82-124 Permit No. 80-31 Permit No. 79-110 Permit No. 80-29 Permit No. 76-20 Permit No. 82-133 Enclosed is the "Subsequent" Sundry Notices detailing work completed on the above-mentioned wells. Very truly yours D. F. Scheve DFS/JEB/cb Attachments cc: SOHIO Alaska Petroleum Co. File PI(DS 6-20)W1-3 PI(DS 6-14)W1-3 Pi(DS 6-11)W1-3 Pi(DS 6-12)W1-3 PI(DS 6-6)Wl-3 Pi(DS 6-23)W1-3 k CEiV D Alaska OiJ & Gas Cons. Cornmissi~r, ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well 702' FSL, 1010' FEL, Sec.2 T10N, R14E, UM 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM 2502' FNL' 271' FWL, Sec. 1, T10N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 74' ~ 12. 7. Permit No. 82-133 8. APl Number 509-29-20808 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 6-23 11. Field and Pool Prudhoe Bay Field I 6. Lease Designation and Serial No. ADL 28311 Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) (Submit in Triplicate) Perforate [] Alter Casing [] Perforations [~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 8-24-85. RU perforating unit and pressure tested equipment. RIH with gun #1 to shoot 9640'-9650' MD (6SPF). Shut in well, POOH, all shots fired. Secured well, RD. Ref: BHCS 10-17-82 kECEJVED Alaska Oil & Gas Cons. Commission Anch0ra!]e 14. I herebV"~ertify that th,e~foregoing is true and correct to the best of my knowledge. The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 and "Subsequent Reports" in Duplicate ~, 7-1 ~q~ · ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: August 14, 1985 Reference' 'ARCO CH Finals 1-22 CNL 2-lA CNL 2-12 CNL 2-26 CNL 6-8 CNL ~-6 -12 CNL "'~6 -20 CNL 6 -23 CNL 7-25 CNL 11-12-84 9-6 Spinner 8-5-85 ~13-33 CNL 11-23-84 'x~' 14-7 CNL 14-33 CNL 18-1 CNL 11-10-84 Run 1 5" Sch 11-7-84 1 5" Sch 11-8-84 1 5" Sch 11-7-84 1 5" Sch 11-12-84 2 5" Sch 11-22-84 3 5" Sch 11-11-84 1 5" Sch 11-11-84 1 5" Sch 1 5" Sch 1 5" Camco ! 5" Sch 11-24-84 11-12-84 11-8-84 Please sign as receipt of data. Received by Pam Lambert ATO 1429C Trans 264 ****THE CORRECT DATE ON THIS LOG IS 11-23-84 NOT 11-23-85'**** Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State of Alaska Texaco ARCO Alaska, Inc. Prudhoe Bay r: _,neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer August 12, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 6-1 DS 6-6 DS 6-9 DS 6-10 DS 6-11 DS 6-12 DS 6-14 DS 6-15 DS 6-20 DS 6-23 Permit'No. 75-49 Permit No. 76-20 Permit No. 79-73 Permit No. 79-75 Permit No. 79-110 Permit No. 80-29 Permit No. 80-31 Permit No. 80-32 Permit No. 82-124 Permit No. 82-133 Attached are the "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS:JEB:pr Attachments cc: SOHIO Alaska Petroleum Co. File P1 (DS 6-1) W1-3 File P1 (DS 6-6) W1-3 File P1 (DS 6-9) W1-3 File P1 (DS 6-10) W1-3 File P1 (DS 6-11) Wl-3 File P1 (DS 6-12) Wl-3 File P1 (DS 6-14) Wl-3 File P1 (DS 6-15) Wl-3 File P1 (DS 6-20) W1-3 File P1 (DS 6-23) Wl-3 RECEIVED AUG 1 191t Alaska 0il & Gas Cons. commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COIv, MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P O. Box 100360, Anchorage, Alaska 99510 4. Location of Well 702' FSL, 1010' FEL, Sec. T10N, R14E, UM 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM 2502' FNL' 271' FWL, Sec. 1, T10N, R14E, UM 7. Permit No. 82-133 8. APl Number 50- 029-20808 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 6-23 11. Field and Pool Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Pz~dhoe Bay Oil Pool 74' RKB I ADL 28311 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~ Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate well 6-23 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator tested at 1.5 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up opera- tions. Proposed Perforation Intervals: ~ 9640' - 9650' MD (10') Ref: BHCS 10/17/82 Alaska 0il & Gas Cons. C0mmissi0n Anchorage 14. i hereby certify that the foregoing is true and correct to the best of my knowledge. Signe t~',~ Title Regional Operations Engineer Date The space below for Commission use Conditions of Approval, if any: Approved by Approved Copy Returned .... , . By Order of COMMISSIONER the Commission Date_ 2//~/s5 Submit "Intentions" in Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate F:'.,'3. l:-:m::< I OOJ~60 ¢'~'n c: h o 'r' a --::j .~:.:,, ~'~ I. a .s- I( a C H C N i... -"' ~: ;'" '"" ":'":: 'u' ,:.., '.:: C: i"I,..;" i'"..! I... ""-,,..-:f:, ':i;' "?' ..'.:':: ('"-, , ("- ~, ~..:.L / .-", "7 ".::' "') :., I"I :..- ~ ~ ~._ '~' .'.'::, '.:' ..' -..' .,'.. .,"' Li """ :"~ ~ .... {i :.,,. ; :...: ". i... 'w,: :: C H ,....;'" !4 i... !i: ,.'5 ':.:;' ": !:.: 4 C i"i iiX: h-.! .... :',i: ,:'".:, "";:' ";" 5: ,:':.':, C H :2 N i... '"'-,,- --.'f:. '".;:' '7 5:'7 i"" !.J Y".. -~' i .il. :."..{1.': 4'. (:) ,.". _.~?.: .,..,_~._.. -.-:..; .- ,..., .. ;.., ,". ~..:,"'-:-u~ :i]: ,':", ':P ';:" '::"; ,.... ~ .-_ ;......, ...- ... .......... · ',i) H :'> 2 8 2 <{; <{:, ;'" Li:[i: ,:!':, ':.i;' ".!i: [ii: ('.':' f" ~..! f'~ ~:.~ [ .ii..-.'. ~..: ~; :.... ~ .... ;... ;.:- ,..; :- ~ · ..: ---..- !:;-: ,'. -'-. q!;~-:5,',a '.gli e U-'-,S t:O:'lS, vu .... tl~o~Dri ( on i. ':.-' ill}H ) ~":-"; ..... i--. l · - :,..>1..: ! :. ~,.-~ .... i., ~I jiil i'!.... F:: i I I.o.I !..I ! . F:'h L !.ii::,!: "" ' "~ ! ............. ; 4., ~:." L ~::'; t .. ....... i'" ¥' :..; -'..; ............ i:X ~. i ..... I:;.: & 1{.".'-' :":.: o h i ,.':) $ +. a t' e o 1:' F:~ t a s' I< a ( N ti) r:':'~'n ..!i: ~,,~,'..:~,'r :,' ARCO Alaska, Inc. Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 24, 1984 Reference: ARCO Pressure Data D.S. 7-15 4-28-84 PBU / Otis 4-28-84 Common Data Base Report D.S. 6-23 D.S. 6-18 7-31-83 11-25-83 D.S. 7-25 4-22-84 D.S. 7-21 4-29-84 Common Data Base Report Common Data Base Report Common Data Base Report Common Data Base Report Common Data Base Report PBU D.S. 7-26 4-27-84 D.S. 14-33 4-29-84 GO Please sign and return the attached copy as receipt of data. HAVE A NICE MEMORIAL DAY WEEKEND! Kelly McFarland ATO-1429F Trans. % 219 DISTRIBUTION Chevr'on Mob i l D & M Mobil E & P "'''~? '~' Drilling Phillips Exp. Services Prudhoe Bay Well Files Ext. Exploration R & D Exxon Carolyn Smith Getty Sohio Marathon State of Alaska ARCO Alaska, Inc.'"-'--. Post Office x 360 Anchorage. Alaska 99510 Telephone 907 277 5637 May 17, 1984 Reference: ARCO Pressure Data D.S. 3-19'~ D. S. 3-22/ · o -3/ DS 32 D.S. 4-!~ D.S. 6-4f D.S. 6-7f D.S. 6-18 D.S. 6-23 D.S. 7-20 D. S-. 7-21 D.S. 7-22 D. S. 7-24 D.S. 7-25/ D.S. 7-26~ D.S. 12-7A/ -D.S. 12-15 D.S. 12-18 D.S· D.S. D.S. D.S. D.S. 13-13/ 13-15/ 13-16: 13 33 18-7 / 4-9-84 Static Camco 4-9-84 Static Camco 4-9-84 Static Camco 3-17-84 Static Camco 1-25-84 PBU GO 1-25-84 Common Data Base Report 1-15- 84 PBU GO 1-15-84 Common Data Base Report 12-27-83 Horner Plots w/listing Sch 8-11-83 Horner Plots w/listing Sch 4-18-84 PBU Camco 4- 29- 84 PBU DA 4-20-84 PBU Camco 4-20-84 Common Data Base Report 4-20-84 PBU " Camco 4-21-84 Common Data Base Report 4-22-84 PBU Camco 4- 28- 84 PBU DA 4-14-84 PBU Otis 4-14-84 Common Data Base Report 4-13-84 ~BU Camco 4-13-84 Common Data Base Report 4-15-84 PBU Camco 4-16-84 Common Data Base Report 4-12-84 Static DA 4-t3-84 PBU DA 4-12-84 Pressure Draw-Down Camco 41-5-84 Static DA 3-14-84 PBU DA 3-14-84 Common Data Base Report sign and return the attached copy as receipt of data. Kelly McFarland · ATO- 14 29F Chevron D & M Trans. ~ 187 Have A Nice Day: ~ . ? ... '""-:",,"~ f~// "',4't.~, Dr i 11 ing Phi 11 ips "',?"3 Exp. Services Prudhoe Bay Well Files Ext. Exploration R & D Exxon Carolyn Smith Getty Sohio Marathon State of Alaska ARCO Alaska, Inc, Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 May 16, 1984 Re ference: ARCO Magnetic Tapes w/listings . ' 'c- ,- ~_~_~_ ~ ... -., - --- , ;~ MJ ' Sch Sch ,- Sch Sch ~ ~ .... -~- Z 0~- 8 ~DT-M'--An. swe r~¢~ 69T59 S ch J D S 1-9/' 4-20-84 TDT-M ~69158 ~ -, , Sch - L~h~A~~P~e-s-e-~t-a t-~--~ An s we r ~69161 Run' 2 · 7D.S.. 12-9~,~ ._4~_22-8_4 _ TDT/5 .pass_es. of TD~T~-M #69160 Run 2 / f_._.~ - ...--- L-e P~oduct Answer #69163 Run 2 ~/D.S. 12-16 ~''',4-22-84 TDT/5passes .~f TDT-M ~69162 Run 2 ~ 61 Ok ~ / ~-~ - ~--...~ ~ .%1, ~/--~ V-?-'i-3 ~___. -- - ~9----t~678W----~, ¥~T?7~ co -~D.S. '- ' ' -r=~- ...--772om~_ ~'2~~'---2;-~--Go ~D'.S7-5~8 5-5r8~ ' ~ passes CN/MSN w/CN Average ~196~ DA c_D TS '. T9 --z4'--~-~ '3~-~ 84-' 3- b-a-~ s ~ s- CN-~ I CN-AYera ge- ~ - -~o-~..qz2Z~o.,6_~, '.- "q. 4 qA.-- o~_~ '~-9-6~--~, -~-d.$~Yz'3~Tes--e~/-CR w/UN--Kverage ~,~v z '~.._.___---,'~ ~d%~-z?-_-- _¢¢ _ .'--"'-"-'~'7_?- _!. '--.i~-~ ,-' ~ "'i /u--tZ;,_T ..-~--~-~- Please sign and return the attached copy as receipt of data. Kelly McFar land ATO-1429F Trans. #173 Have a Nice Day! DISTRIBUTION ~hevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon Mobil E & P Phillips Prudhoe Bay Well Files R& D{_~, ~ Carolyn Smith [,.~u,,----,5 Sohio State of AlaskaC~O ~ ARCO Alaska, Inc. Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 17, 1984 Reference: ARCO Cased Hole Finals D.S. 1-24~ 4-18-84 CFS/Spinner D.S. 6-23 / 4-23-84 CH CNL D.S. 12-28j 4-24-84 CH CNL D.S. 13-15 ~ 4-13-84 PLS D.S. 13-98~(Monitor Well) 11-11-83 DIFL/GR (CH) D.S. 13-98'~ 11-12-83 Carbon/Oxygen Log D.S. 13-98'~' 2-12-84 Carbon/Oxygen/GR D.,S. 15-11/' 4-18-84 CFS/Dif~ Temp Log nGI #11/ 4-22-84 Collar/Perf Log Run i 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" DA Run 2 5" DA Run 3 5" DA Run 4 5" DA Run 1 5" GO Run 1 2" GO ~gn and return the attached copy as receipt of data. Have A Nice Day' Kelly McFarland ATO-1429F Trans. # 183 DISTRIBUTION Chevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon Mobil. Mobil E & P Phillips Prudhoe B/~-Well Fi-lea ~_ Carolyn Smith · Sohio "':'~ .'~., , ....... Commiss[o~ State o~ Alaska .' . . Bill Sheffield, Governor ALASKA OIL AND OAS CONSERVATION COMMISSION April 27, 1984 3001 PORCUPINE DRIVE ANCHORAG E,ALASI~,A 99501 '-3192 TELEPHONE (907) 279~1433 A D M I N I S T R A T I V E A P P R O V A L NO. 165.8 Re: The application of ARCO Alaska, Inc., Eastern Area operator, Prudhoe Bay Unit, to substitute Prudhoe Bay Unit Wells 6-23 and 7-17 for current keys Wells 6-3 and 2-6 in the Gas-Oil- Contact (GOC) monitoring key well program. Mr. D. F. S cheve Regional Operations Manager ARCO Alaska, Inc. P. O. Box 100360 An~chorage, Alaska 99510 Dear Mr. Scheve: The referenced application was received on April 24, 1984 and stated that Wells 6-3 and 2-6 would no longer be suitable for GOC monitoring. These two wells now show gas saturations to exist from the top of the Sadlerochit do~ to the top of the perforations. Our studies indicate the selection of Wells 6-23 and 7-17 as suitable for continued monitoring of gas-oil-contact movement. The well substitutions will not cause undue problems and appears to be a prudent action. The Alaska Oil and Gas Conservation Commission hereby authorizes the substitution of Prudhoe Bay Unit Wells 6-3 and 2-6 in the Gas-Oil-Contact Monitoring program, pursuant to Rule 9(e) of Conservation Order No. 165. Yours very truly, Harry ~7. Kug!e~ Commis s ioner BY ORDER OF THE COMJ~ISSION be ALASKA OIL AHD GAS ~,O#S££VATIOIV ~,O,~, I'~ISS/O~I Bill Sheffield Governor 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501=3192 TELEPHONE(907) 279-1433 We wish to bring to your attention that the Commission has not yet received the following required items on the subject well which our records indicated was completed Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 days after completion of a drilled well. Please-submit the above missing material. Sincerely, · V. Chatt~ on Chairman ALASKA OIL AND GAS CONSERVATION COMMISSION TO: Z-XC. Permit No. Bill Sheffield Governor 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501;-3192 TELEPHONE(907) 279,-1433 We wish to bring to your attention that the Commission has not yet received the following required items on the subject well which our records indicated was completed //~/-~z/- ~ Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, Stipulates that this material shall be filed within 30 days after completion of a drilled well. Please submit the above missing material. Sincerely, C. V. Chat~ Chairman ARCO Alaska, Inc~----. Post Office x 360 Anchorage. Alaska 99510 Telephone 907 277 5637 October 17, 1983 Reference: Cas~o~le~Fina 1 s / D.S. 2-17 8-6-83 Spinner Log D.S. 5-2 9-16-83 Collar Log / / D.S. 6-18 7-30-83 EPL D.S. 6-23 7-31-83 EPL ~D.S. 13-98 9-12-83 ~ 9-15-83 CPL/CNT-A & CNT-G CPL/CNT-A & CNT-G /D.S. 14-2 8-4-83 Spinner Log 5" Camco Run 1 5" GO Run 1 5" Sch Run 1 5" Sch 5" Sch - 5" Sch 5" Camco ~~Please sign and return the attached copy as receipt of data. - Kelly McFarland ATO-1429F Trans. # 575 C~vron D & M Dallas -~Drillihg ;'EXxon Marathon DISTRIBUTION North Geology Phillips Prudhoe Bay R & D Caroline Smith .Sohio, -~'~;a,~e o£' ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 : Anchorage, Alaska 99510 '; . Telephone 907 263 4248 Donald F. Scheve RegiOnal Operations Engineer June 27, 1983 Mr. C. V. ,"Chat" Chatterton. State of Alaska Division of Oil and Gas 3001 PorcUpine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re' DS 6-17 Permit No. 82-90 DS 6-18 Permit No. 82-99 DS 6-19 Permit No. 82-114 DS 6-20 Permit No. 82-124 DS 6-21 Permit No. 82-127 DS 6-22 Permit No. 82-131 '_DS 6-23 ~ Permit No. 82-133 DS 6-24 Permit No. 82-147 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. [. ScheYe Regional [n§~neer DFS/JCD/lw Enclosures cc. Sohio Petroleum Co. STATE OF ALASKA '¢~-. ALASKA,~,L AND GAS CONSERVATION qL ,MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG _-- 1. Status of Well Classification of Service Well OIL ~(]/( GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 82-133 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 5o-029-20808 4. Location of well at surface 9. Unit or Lease Name 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 2507' FSL, 33' FEL, Sec. 2, T1 ON, R14E, UM 6-23 At Total Depth 11. Field and Pool 2502, FNL, 271' FWL, Sec. l, T10N, RI4E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.') I 6. Lease Designation and Serial No. Prudh0e Bay 0i 1 P0ol 74! RKBI ADL 28311 · 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. No. of Completions 10/01/82 10/18/82 10/24/82I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey /20' Depth where SSSV set I 21. Thickness of Permafrost 9875'MD,9237'TVD 9829'MD,9199'TVD YES[~ NoEl Inipp]e@2093feetMDI 1900' (appr0x) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, FDC/CNL/GR/Ca], CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ?n" 91.5# H-40 Surf 79' 30" 1990 # Poleset ~_~_3/R" 72 fl~ !-80 Surf . 2525' 17-1/2" 2400 sx Fondu & 400 sx Permafrost C '~-5~8" 47.0# L-80/ Surf 9016' 12-1/4" 500 sx Class G & 5C bbls Permafrost S00-95 7" 29.0# L-80 8697' 9870' 8-1/2" 325 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9616-9630 MD 4 spf 5-!/2" R7.54' 8643' 9560-9600 MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 8901'-895'.g- .TVDSS · DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED Ref' BHCS 10/17/82 27. PRODUCTION TEST Date First Production '1 MethOd of Operation (FloWing, gas lift, etc.) 5/]/83I Flowing DateofTest Hours Tested ' PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 5/]'9/83 6.2 TEsT PERIOD ~ 684 213 4 55 520 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 772 N/A 24-HOURRATEI~ 2669 1387 0 27.0 28. CORE DATA Brief description of lithology, I~orosity, fractures, al)parent dips and presence of oil, gas or water. Submit core chips. ~L;[\i ~, 0 '' ..... " · _ b01l]/T!i,t;..:iOr' Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. NAME Top Sadlerochit Orig. G/O Contac G/OC moved to HOT O/W Contact Base Sadlerochit 31. LIST OF ATTACHMENTS GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH 861 3 8652 8715 9058 9078 9161 FORMATION TESTS Include interval tested, pressure data, all fluids recove,e('J an(J (]r;ivity. 9130 9176 9250 9660 9683 9783 GOR, and time of each phase N/A 32. hereby certify that the foregoing is true and correct to the best of my knowledge Regional Engineer INSTRUCTIONS General: This form is designed for submitting a complete and correct well complet on report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL)or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ARCO Alaska, Inc. Post Gffice Box 350 Anchorage. ALaska 99510 Telephone 907 277 5637 June 10, 1983 Reference: ArCo Directional Data ._. D.S. ~D.S. 1-22~- 10-23-82 6-23 10-3-82 13-15~ 10-7-82 13-28 /5-25-83 18-7 9-14-8,2 ~8-~0 ~-~0-5-82 Magnetic Survey Magnetic. Survey Magnetic Survey Teleco/DSS Magnetic Survey Magnetic Survey Teleco Teleco Teleco EW Teleco Teleco Please sign and return the attached copy as Kelly McFarland ATO-1429D Trans. % 379 ' receipt of data. DISTRIBUTION R&D DRILLING PHILLIPS -:;';-SOHIO- i- ¢'::'-"L :-'--'-. - ' ' ' MARATHON CHEVRON GETTY D&H · -,.:, ~ -.......:. ~._,,:..- .. ~ '.~=.~_.:,.:_-,,:, :..:... DALLAS C E IVE D' CAROL[NE SHITH · . ARCO Alaska, Inc. Post Office L 360 Anchorage. AlasKa 99510 Telephone 307 ,-,., June 10, 1983 Reference: Arco Pressure Data D.S. 1-13J 5-30-83 D.S. 1-18 / 5-30'83 D.S. 6-18 × 5'11-83 D.S. 6-23/r 5-1-83~ D.S. 7-2 4-9-83 4-9-83 D.S. 12-11/ '5-30-83 .D.S. 14-29J- 4-2-83 4 -2-83 D.S. 14-30 / 4-1-83 4-1-83 D.S. 17-5'f 5-19-83 D.S. 17-9/ 5-18-83 Static Survey Camco Static Survey Camco Static Survey Camco Static Survey DA Pressure Build-up Camco Pressure Build-up Data Sheet Static Survey Camco Pressure Build-up Camco Pressure Build-up Data Sheet Pressure Build-up Camco Pressure Build-up Data Sheet Static Survey Camco Static Survey GO Please sign and return the Kelly McFarland ATO-1429D Trans. # 381 NORTH GEOLOGY DRILLING 0 .: ..-. ~ ~.:~...~.~....-:_.~. .... MARATHON CHEVRON attached copy as receipt DISTRIBUTION ;, :. _.:....-~,;~T, ,-., Z~ .......... ~:.D-& M · .,_,, .:~ -,., ¢.~.,~. -,..-:-...2 ~.~ 2 :. .......... · .- . . . - _.....~-.~-..,,~,~.¢,.~:..,.~.,.. . DALLAS CAROLINE SMITH of data. ARCO Alaska, Inc. ~ Prudhoe Bay t_..~meering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 13, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 6-17 DS 6-18 DS 6-19 DS 6-20 DS 6-21 DS 6-22 DS 6-23 DS 6-24 Permit No. 82-90 Permit No. 82-99 Permit No. 82-114 Permit No. 82-124 P~rmit No..82-127 Permit No. 82-131 Permit No. 82-133 Permit No. 82-147 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Very trUly yours, D. F. Scheve DFS/JCD/lmi Attachments cC: Sohio Petroleum RECEIVED ARCO Alaske, Inc. Is · Subsldl·r¥ of AllantlcRIchfleldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C~JMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO. Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of Well 702' FSL, lOlO' FEL, Sec. 2, T1ON, R14E, UM (Surf) 2507' FSL, 33' FEL, Sec. 2, TION, R14E, UM (Top Prod) o~no, ~,, o71, ~,.,, ¢-~ I T6I~' o~ ,,- f~ ¢.-,..~t.~.- .I I1~.. ,,. (..-I I I ilL--- -../~.t.... 'l .~/11, .~1\ I.'-rL-., Ul"l_ 5. Elevation in feet unalcate KB, DF, e(c.) . Lease ues~gnatlon and ~e~r~l/No. 74' RKB I AD[ 28311 12. 7. Permit No. 82-133 8. APl Number 50- 029-20808 9. Unit or Lease Name Prudhoe Bay Unit 10, Well Number D.S. 6-23 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations J~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 4/30/83. RU perforating unit, pressure tested surfaCe equip_m~ent. RIH w/ gun #1, gun did not shoot. POOH. RIH w/ gun #l-A, shot 9616C~s MD, 4 SPF. Flowed well to FS3, monitored rate and took shakeouts'.~F~O~,_ RIH w/ gun #2, shot 9580-9600' MD, 4 SPF. POOH. RIH w/ gun #3, shot~580' MD, 4 SPF. POOH - perforating complete 5/1/83. All depths referenced to BHCS 10/17/82. RECEIVED J U N ! ,5 1983 Anchorage ..... . · ~ , ~! ', 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed b~r3~ ~ n~se~//~ Title Regional Engineer The space below for Commissio Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay E. _.,neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 19, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: D.S. 6-19 D.S. 6-20 D.S. 6-21 D.S. 6-22 D.S. 6-23 D.S. 6-24 Permit No. 82-114 Permit No. 82-124 Permit No. 82-127 Permit No. 82-131 Permit No. 82-133 Permit No. 82-147 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. S cheve DFS/DHP/lmi Attachments cc: Sohio Petroleum ARCO Alaska, Inc. Il a Subsidiary of AtlanllcRIchlleldCompany STATE OF ALASKA ALASKA oiL AND GAS CONSERVATION CuMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELLY~] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-133 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20808 4. Location of Well 9. Unit or Lease Name 702' FSL, 1010' FEL, Sec. 2, T10N, R14E, UM Prudhoe Bay Unit OTHER [] 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UM 2502' FNL, 271' FWL, Sec. 1, T10N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 74' RKB I ADL 28311 10. Well Number DS 6-23 12. 11. FieldandPool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [x:-i Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. Upon perforating, the well will be flowed to the flow station for clean-up and production. Should additional drawdown be necessary to unload the well, it may be flowed to a tank for initial clean-up. The perforated intervals will be given in the subsequent report. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: Ref: BHCS 10/17/82 9560-9600' MD 9616-9630' MD APR '2, 1. 1983 14. I hereby_certify that the~forej;koing is true and correct to the best of mvknowledge. ~~, ,~/~/)~_,,~~7~, Regional Engineer Signed ........ _ . _ ~ Title The .space below for Commission use / Conditions of Approval, if any: Approved by IIRIG!N,~[ SIGNED BY L!:I(~,~E C. SMITI! Approved Copy //~f~urnec~ '~-'./~ 3" By Order of COMMISSIONfiR the Commission Submit "lntdntions" in Triplicate Form 10403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office B,'~Z~360 Anchorage, I '{~ 99510 Telephone 90'/ 277 5637 December 9, 1982 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine. Drive Anchorage, AK 99501 SUBJECTi State Reports Dear Mr. Chatterton: Enclosed' are monthly reports for November on these drill sites' 1-22 13-6 1-23 13-11 1-24 13-13 6-24 13-14 7-15 1C-9GI 7-16 lC-IOGI 12-19 1E-24 12-20 1E-25 WSW-6 WSW-7 WSW-8 Also enclosed are well completion reports for: 1-21 1G'4' 6-23 WSW-4 13-15 WSW-5 18-10 WS.24 1F-7 The survey for 2-22'needs to be reran; a completion report for this well will be submitted when an approved survey is received. We also are including a subsequent Sundry Report for WS 24. Since the information on the WS 24 well is of a confidential nature, we would appreciate it if you could store it in a secure area. ~ Sincerely, P. A. VanDusen District Drilling Engineer PAV'JG'sm Attachments GRUl/L3 ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany ,:"'*'-~ STATE OF ALASKA ..... . 0 RI§IN ALASKA.-..~_AND GAS CONSERVATION CC MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 82-133 3. Address 8. APl Number P. 0. Box :~60, Anchorage, AK 99510 50- 029-20808 4. Location of well at surface~L~T77~/?..~,,_... i :'.~.'~--~i( :"'~S J 9. Unit or Lease Name 702' FSL, 1010' FEL, Sec 2, T10N, R14E, UM ! V,%;t;:i.'-'-D I Prudhoe Bay Unit At Top Producing Interval ,Surf. ~r~' , 10. Well Number 2507' FSL, 33' FEL, Sec. 2, T10N, R14E, UN/ ~---J~---~ 6-23 At Total Depth ~ 11. Field and Pool 2502' FNL, 271' FWL, Sec. 1, T10N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 74' RKB ADL 28311 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. 15. Water Depth, if offshore 116. No. of CompIetions 10/01/82 10/18/82 10/24/82 N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD} 19. DirectionalSurvey I 20. Depth where SSSV set I 21.Thickness of Permafrost 9875'MD,9237'TVD 9829'MD,9199'TVD YES ~ NO [] nipple ~ 2093 feet MD 1900' (approx) 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR, FDC/CNL/GR/Cal, CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 79' 30" 1990 # Poleset 13-3/8" 72.0# L-80 Surf 2525' 17-1/2" 2400 sx Fondu & 400 sx P~rmafrost C 9-5/8" 47.0# L-80/ Surf 9016' 12-1/4" 500 sx Class G & 50 bbl,, Permafrost C S00-95 7" 29.0# L-80 8697' 9870' 8-1/2" :~25 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 5-1/2" 8754' 8643 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. ~ DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A . 27. N/A PRODUCTION TEST Date First Production MethOd of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Submit in duplicate Rev. 7~1-80 6RU2/~C25 CONTINUED ON REVERSE SIDE 29. NAME GEOLOGIC MARKERS Top Sadlerochit Orig. G/O Contact G/OC moved to HOT O/W Contact Base Sadlerochi t MEAS. DEPTH 9130' 9176' 9250' 9660' 9683' 9783' TRUE VERT. DEPTH 8613' 8652 ' 8715' 9058 ' 9078' 9161 ' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and grav~y, GOR, and time of each phase N/A 31. LIST OF ATTACHMENTS Drilling History~ Gyroscopic Survey (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~ Title Area Dri 1 1 i ng Engr. Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". DS 6-23 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well @ 2100 hrs, 10/01/82. Drld 17-1/2" hole to 2541'. Ran 63 jts 13-3/8" 72#/ft, L-80, BTC csg w/shoe @ 2525'. Cmtd 13-3/8" csg w/2400 sx Fondu & 400 sx Permafrost C. ND 20" Hydril & diverter. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - press, leaked off. Drld FC. Tstd csg to 1500 psi - ok. Set 13-3/8" cmt retainer @ 992'. Drld top slips of ret & pushed downhole. TIH & tagged ret @ 1699'; pushed to 2444'. Drld & pushed ret to 2525'. Drld on ret @ csg .shoe. Drld ret & FS - pushed junk to 2534'. Pulled up into csg; squeezed shoe w/250 sx Permafrost C. TIH & tagged top of cmt @ 2268'. Drld cmt & 10' new form to 2551'. Tstd form. to 11.1 ppg EMW - ok. Drld 12-1/4" hole to 6590'; stuck pipe & recovered. Cont drlg 12-1/4" hole to 9025'. Ran 219 jts 9-5/8" 47#/ft, L-80/S00-95, BTC csg w/shoe @ 9016'. Cmtd 9-5/8" csg w/500 sx Class G. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 9863'. Ran DIL/SP/BHCS/GR, FDC/CNL/GR/Cal to 9-5/8" shoe, CNL/GR to 13-3/8" shoe. Cont. drlg 8-1/2" hole to 9875' TD (10/18/82). Arctic packed 9-5/8" x 13-3/8" annulus w/300 bbls H20, 50 bbls Permafrost C & 125 bbls Arctic Pack. Ran 30 jts 7" 29#/ft, L-80, BTC csg f/8697'-9870'. Cmtd 7" lnr w/325 sx Class G. Drld cmt to 9829' PBTD. Tstd lnr lap to 3000 psi - ok. Displaced well to NaC1. Ran CBL. Ran 5-1/2" completion assy w/tail @ 8754' & pkr @ 8643'. Top of tieback sleeve 8689'. Tstd tbg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Displaced tbg to diesel. Dropped ball & set pkr. Nipple fbr SSSV @ 2093'. Secured well & released rig @ 0930 hrs, 10/22/82. Gyroscopic survey ran 10/24/82. JG:llm 11/29/82 GRU2/DH33 TELEEO Teieco Oilfield Services inc. 220 A Center Court Anchorage. Alaska 99502 November 3, 1982 Kevin Grimes Arco Rowan 26 Dear Kevin, Attached please find a copy of the computer calculated survey for the above mentioned well. On behalf of Teleco, I would like to thank you for the opportunity to serve you. We at Teleco realize the importance of good service and hope shat you will continue to use our MWD services in the future. Please feel free to contact me if you have any questions. E~clos~res SB-ck Sincerely, Steve Billeaud Field Service Supervisor TELEEO T~leco Oilfield Services Inc. 220 A Center Court Anchorage. Alaska 99502 Job #169AK ARCO ROWAN 26 Teleco - Days on location 10-3-82 to 10-14--82. 0800 10-3-82 to 0800 10-4-82 Teleco in @ 2300, began drilling out of cement. When pressure testing revealed a leak, took out of hole and lay down Teleco. Ran RTTS tool. 0800 10-4-82 to 10-5-82 Teleco out of hole. 0800 10-5-82 to 10-6-82 Teleco in hole @ 1500. Rotary drilled to 4000', then picked up dyna drill w/1½°. Bent sub @ 1530 10-6. 0800 10-6-82 to 0800 10-7-82 Drilled w/D-500 from 1900o 4338' 6° N20E Built 5.9° angle. Checked w/single shot @ 10-7-82 to 10-8-82 Rotary drilled from 1600 to 2300. Right walk to N40.?E, and 16° inc. Confirmed by single shot. Took out of hole to pick up D-500, and drilled from 0530 to 0800. 0800 10-8-82 to 0800 10-9-82 Ended correction run at 0900 with: 19.4° inc., N26.3°E. Then R.D. to 1930, took out of hole and CHANGE BHA, then drilled from 0100 hours to 0800 hours ending with 36.4° N4OE. 0800 10-9-82 to 0800 10-10-82 Another motor run, slick 2/D-500 to stop right walk. Ended at 2200 w/N25.9E, 37.3© Stuck on tip in at 0600 hours . · 0800 10-10-82 to 0800 10-11-82 Jar and Circulate. Job #169AK cont. 0800 10-11-82 to 0800 10-12-82 Backed off at 6412' and retrieved fish. Laid down DHA 255-24 and picked up 256-24. Benchmarked on TIH - excellent agreement. 0800 10-12-82 to 0800 10-13-82 Rotary drilled from 0800 to 2000 hours. Ending valves 7549, 30.4° N17 5E Then tripped to switch stab for 2nd RWP(stab replaced 2nd RWP). Teleco was out of hole from 2230 to 2300 hours. During TIH ran into a bridge at 7250'and spent ½ hour washing and reaming, then continued TIH and rotary drilled from 0300 hours to 0800 hours. 0800 10-13-82 to 0800 10-14-82 Rotary drilled to TD. Job Complete 10-15-82. DIRECTION~L CIJSTOMER : ARCO LOCATION : PRUDHOE BAY, ALASKA WELL PAD : DS-6 WELL NO. m DRILLINO CO. I ROWAN CUSTOMER JOB NO. : TELECO JOB NO. ~ 169-AK MAGNETIC DECLINATION : 30.30 E PLANE OF PROPOSED DIRECTION IS : 23 RIO NO. ~ 26 N 27.02 E SURVEY REPORT PAGE TELECO OILFIELD SERVICES OF ALASKA, INC, 228 CENTER CT., ANCHORAGE, ALASKA, 99502 TEL a (907) 279-8631 DATA REDUCED BY RADIUS OF CURVATURE METHOD TYPE OF SURVEY ~ MAGNETIC START DATE I 18/83/82 FINISH DATE a 10/15/82 REPORT PREPARED BY ~ MARTIAL BROUSSARD MEASURED DRIFT TRUE VERTICAL .DRIFT TOTAL COORDINATES C L 0 S U R E S DOG - LEO DEPTH ANGLE VERTICAL SECTION DIRECTION DISTANCE ANGLE SEVERITY DEG MIN DEPTH DEGREES DD MM SS DEG/100 FT. 2528 0.08 2528.88 0.08 N · E 8.88 - 8.88 - 8.88 ........... 3065 0.36 3064.99 2.52 S 78 E 1.64 N 2.34 E 2.85 N 55 88 88 E 8.118 3949 8.12 5948.99 5.28 N 27 E 3.78 N 4.37 E 5.73 N 49 45 57 E 8.844 4862 1.18 4861.98 6.76 N 53 E 4.98 N 5.11 E 7.14 N 45 44 55 E 8.975 4154 2.42 4153.92 9.95 N 55 E 7.64 N 6.91 E 18.30 N 42 86 39 E 1.523 4246 4.48 4245.72 15.93 N 52 E 12.66 N 18.25 E 16.28 N 38 56 17 E 2.292 4338 8.18 4357.12 26.42 N 28 E 22.89 N 14.83 E 26.61 N 35 52 28 E 4.865 4533 8.18 4558.88 54.18 N 15 E 48.94 N 23.38 E 54.28 N 25 27 16 E 8.578 4~98 11.80 4692.75 81.54 N 22 E 75.17 N 52.87 E 81.73 N 23 86 21 E 1.781 4853 13.18 4844.27 114.15 N 29 E 184.62 N 46.12 E 114.53 N 25 47 28 E 1.768 5848 16.58 5852.72 163.88 N 41 E 145.69 N 74.88 E 163.88 N 27 12 83 E 2.272 5165 19.54 5141.96 199.37 N 29 E 175.11 N 95.48 E 199.45 N 28 56 04 E 4.586 5285 19.24 5179.63 212.82 N 26 E 187.84 N 181.69 E 212.98 N 28 31 53 E 2.814 5369 28.42 5555.57 269.73 N 26 E 258.19 N 126.64 E 269.77 N 27 59 51 E 0.783 5525 21.88 5481.36 525.25 N 27 E 287.88 N 151.41 E 525.27 N 27 44 51 E 0.298 5741 21.48 5682.47 484.86 N 28 E 557.79 N 187.88 E 484.09 N 27 41 41 E 0.487 5962 26.48 5885.89 494.92 N 31 E 436.95 N 252.59 E 49~.99 N 28 81 55 E 2.358 6177 32.30 6878.73 688.49 N 37 E 525.12 N 292.86 E 688.88 N 29 84 55 E 2.986 629~ 56.24 6171.3& 668.12 N 48 E 579.15 N 335.83 E 669.86 N 58 82 56 E 5.485 6571 37.48 6228.76 718.61 N 38 E 612.89 N 562.36 E 711.99 N 58 55 54 E 2.567 6462 37.54 6388.62 765.97 N 51 E 658.98 N 393.98 E 767.71 N 38 52 56 E 4.719 6522 37.18 6348.16 882.57 N 26 E 691.88 N 411.45 E 884.29 N 58 46 07 E 5.181 ~6666 36.42 6463.16 889.82 N 28 E 770.85 N 445.31 E 890.23 N 30 80 53 E 2.~41 7884 54.18 ~885.46 1129.87 N 17 E 1881.84 N ~ 522.55 E 1129.12 N 27 33 18 E 0.?09 DIRECTIONRL :~;U Rt2E ~i~ REPORT PAGE '2 JOB NUMBER i 169-A1( CUSTOMER : ARCO PAD : DS-6 WELL NO. ' 25 MEASURED DRIFT TRUE VERTICAL DRIFT TOTAL COORDINATE8 C L 0 8 U R E 8 DOG - LEG DEPTH ANGLE VERTICAL SECTION DIRECTION DISTANCE ANGLE SEVERITY DEG MIN DEPTH DEGREES DD MM SS DEG/100 FT. 7391 31.0~ 7861.80 1292,64 N 18 E 1159,22 N 572.21 E 1292,75 N 26 1~ 18 E 1,857 7484 30.24 7141,75 1359,68 N 18 E 1284.44 N 586.98 E 1339,82 N 25 58 44 E 8,753 7790 28.36 7488,0G 1488.81 N 28 E 1346.91 N G35.96 E 1489.58 N 25 16 29 E 8.~70 8895 27.06 7677,73 1638.9& N 26 E 1478.87 N 691.63 E 1631,88 N 25 84 54 E 1,842 8488 25.58 7953,48 1761.24 N 31 E 1'592.62 N 755.83 E 1762.81 N 25 19 45 E 1,572 869~ 25.18 8221,22 1882,68 N 25 E 1699.85 N 818.84 E 1883.34 N 25 58 05 E 1,841 8974 29.12 8478.14 2889.31 N 47 E 1883.57 N 886.20 E 2889.53 N 26 18 03 E 3.854 BOTTOM HOLE CLOSUREI 2089.53 FEET AT N 2B 18 3 PREPARED BY ABACUS COMPUTER SERVICE 820 W. 718T. AVE, ENTIRE CONTENTS COPYRIGHT 1982 ABACUS COMPUTER SERVICE E ANCHORAGE~ ALASKA (987) 344-8761 Eastman/ Whipstock ,4 PE*TF~LANE REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO ALASKA, INC. COMPANY DS 6r Well Number: 23 WELL NAME JOB NUMBER Prudhoe Bay, North Slope, Alaska LOCATION RECEIV~D NOV 0 E i982 TYPE OF SURVEY D£rectlonal Single Shot (Teleco) Alaska Oil-a Gas Cons. ~[~,Ston Anchorage 06-0ct-82 SURVEY BY Controlled Drilling Consultants (Hendrix) OFFICE ARC'.O ALASKA ~ I NC:. DS 6, WELL NO: 23 DSS/TELECO (CDC) PRUDHOE BAY, NORTH SLOPE, ALASKA .... T'ELECO~'l O-8~4'IIMD, [~S~I'; .... 8,~7I~-98~'~3 MD, DRILLER: D HEINDRI'X VERTICAL SECTION CALCULATE~i~I RECORD Of SURVEY RADIUS OF CURVATURE METHOD RCO ALASKA, INC. $ 6, WELL NO: 23 DS~/TELECO RUDHOE BAY, NORTH SLOPE, ALASKA COMPUTATION PAgE NO. · TIME ..... DATE 15:47:04 18-00T-82 ..................................... TRUE .............................. EASURED DRIFT .DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITY FEET g M D M FEET FEET' FEET FEET FEET FEET D M DG/1OOFT O. 0 0 0 0 O. 0.00 0.00 -74.00 0.00 0.00 0.00 0 0 0.00 2520." '0 0 0" 0 2520. ..... 2520,00 0,00 24'46,00 0;'00 0.00 0.00 0 0 0,00 3065'. 0 36 S 70 0 E 545. 3064.99 0.35 2990.i99 0.98 S 2.68 E 2.85 S 70 0 E 0.11 3497. 0 0 0 0 432. 3496.98 0.63 3422..98 1.75 S 4.81E 5.12 S 70 0 E 0.14 3949. 0 12 N 27 0 E 452. 3948-98 1,"42 3874';98~ 1',04'$ 5,"I'7 E 5,27 S 78 36 E 0.04 4062. I 18 N 33 0 E 113. 4061.97 2.90 3987.97 0.24 N 5.91 E 5.91 N 87 41 E O. 4154. 2 42 N 34 0 E 92." 4153.91 6'09 4079;91 2,'92'N 7'.68 E 8,'21 N 69 13'E 1,'52 4246. 4 48 N 30 0 E 92. 4245.71 12.08 4171.71 8.02 N 10.87 E 13.50 N 53 35 E 2.30 4338. 6 0 N 19 0 E 92. 4337.30 20.72 4263.30 15.88 N 14.45 E 21.47 N 42 18 E 1.72 '4533, 8 18 N 14 42 E 195, '4530;77 44'60 .....4456'77 39"~11N 2I'49 E 44;62 N 28 47 E 1.'21 4698. 11 0 N 21 42 E 4853. 13 18 N 29 24 E 5048. 16 18 N 40 24 E 5203. 19 24 N 26 18 E 5369. 20 42 N 26 18 E 5525. 21 0 N 27 0 E 5741. 21 48 N 28 0 E 5960. 26 48 N 30 30 E 6177. 32 30 N 37 12 E 6299. 36 24 N 40 0 E 6522.. 37 18 N 25'54 E 7084. 34 18 N 16 48 E 7391. 31 6 N 17 30 E 7484. 30 24 N 17 30 E 7790. 28 36 N 19 36 E 165.! .42 65.36 N 155 ~844.94 195 i033.45 15~.~.~ ~.~;.~959.45 ~::.~35.5~ N' 166. 156. 5482.69 216. 5683.79 219. 5883.33 217. 6071.84 122. 6172.42 313.28 5408,69 275.78 N 392.09 5609.79 345.69 N 482.11 5809.33 424.29 N 588.60 5997.84 513.36 N 656.19 '6098.42 567.28 N 223. 6350.87 788.88 6276.87 679.22 N 562. 6806.63 1115.63 6732.63 985.05 N 307. 7064.94 1279.00 6990.94 1143.50 N 93. 7144.87 1325.89 7070.87 1188.85 N 306. 7411.19 1474.91 7337.19 1331.89 N 30.12 E 71.97 N 24 44 E 1.78 =.18 E 104.56 .... N 25 '0 E 1.81 ~3 E 153.79 N 28 11E 2.10 ~8 E 201.03 N 29 24 E 3.42 90 E 257.87 N 28 43 E 0.78 404.55 E 790.57 N 30 47 E 524.09 E 1115.79 N 28 I E 572.99 E 1279.03 N 26 37 E 587.29 E 1326;00 N 26 17 E 635.22 E 1475.44 N 25 30 E 3.81 1.09 1.05 0.75 O. 68 8095. 27 6 N 25 36 E 8400. 23 30 N 31 12 E 8694. 25 18 N 38 12 E 8975. 2~ 0 N 46 0 E ~353. 33 0 N 48 0 E 305. 7680.85 1616.90 7606.85 14~3.17 N 689.95 E 1617.68 N 25 15 E 305. 7956.55 1747.13 7882.55 1577.76 N 751.91 E 1747.77 N 25 29 E 294. 8224.28 1867.42 8150.28 1677.55 N 821.00 E 1867.68 N 26 5 E 281. 8474.28 1991.12 8400.28 1772.60 N 906.89 E 1991.12 N 27 6 E 378. 8798.22 2174.06 8724.22 1905.34 N 1049.24 E 2175.14 N 28 50 E 1.04 1 .'42 1.16 1.82 1.09 ~RCO ALASKA, INC. )S 6, WELL NO: 23 DS~/TELECO ~RUDHOE BAY, NORTH SLOPE, ALASKA COMPUTATION PAC~E NO. -~ CDC ) T I ME DATE ' 15: 47: 04 18-0CT-82 ............................. TRUE IEASURED DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITY FEET D M D M 'FEET FEET FEET FEET FEET FEET .... D M DG/IOOF~ 9863. 33 30 N 46 0 E i 510. '9224.72 2436.86 9150.72 2096.04 N 1253.73 E 2442.38 N 30 5:3 E 0.24 FINAL CLOSURE - DIRECTION: DISTANCE:" N 30 DEOS 53 MINS 8 SECS E 2442.38 FEET DRIFT CHART"S RELATED DATA FILE ARCO ALASKA, INC. DS '6.,' WELL NO: '23 DSS/TELECO PRUDHOE BAY, NORTH SLOPE, ALASKA (cDc) ......... SURVEY FILE NUMBER 138[) BOTTOM HOLE ASSEMBLY VALUES USED FOR DEPTH ARE MD DEPTH 4000.00 4435.00 5087.00 5271.00 6348.00 7549.00 ~025.00 DESCRIPTION nNaLE 9U~LD A~ ~LY DYNA DRILL , ....... ANGLE BUILD ANGLE BUILD A88EHBLY ANC~LE BUILD ASSEMBLY DAY [mR ILL I NG DAYS VALLIES USED FOR' DEPTH ARE 'MD DEPTH 1 2 4 5 6 7 10 11 12 13 14 15 16 17 18 1039.00 2530.00 2541.00 2541.00 2541.00 4371.00 5169.00 6231.00 6590.00 6590J'00'~ 6720.00 7~62.00 8632.00 9025.00 9025.00 9660.00 98&,3.00 9875,00 WEIGHT ON BIT WEIGHT IS GIVEN PER 1000 POUNDS VALUES USED FOR DEPTH ARE MD DEPTH WEIGHT 4000.00 4435.00 5087.00 5271.00 6348.00 7549.00 9025.00 0.00 70. O0 O. O0 70.00 70. O0 65.00 60. O0 REVOLUTIONS PER MINUTE VALUES USED FOR DEPTH ARE MD DEPTH R.P~M. 4000.00' 4435.00 5087.00 6271.00 6348.00 7549.00 9025.00 ' 0. ()0 .................. , ............................................... 140. O0 O. O0 120'. O0 120. O0 100. O0 100. O0 F'R U D H lEI E :,'.~'.~r..q Y:, N O R T H S L.r"~I::'E'""" ~ ~ (.~1_~...~.::,1'...~ D~.~"I"E F;,'L.IIq :: 2/I ..... C 1:3 Y 1-'~: O Ixl r' ......... :: /' ';::'/-., ""~...~ t"t' I::.'- I",," ~ N 'D :: :1. ,.~:,/.I. zl- , .r.::; .......... .... -'.) C) ]("1 FEE f".i lei / I.I Iq ~-~ -" ] ............ ':'i/.. / 1:::' (31::~: Iii:' S I (3 H'I" ,", ::.:i; ]. 4 ;I./::. [ii; !]30FR VE~. Y"T F.~ 1:;:: E' lq "'t:' l::iO 1/LillE IZ[, I:::i k:i F;, RADIL.hi:: r-il= C:URVATLIRE METHOE~ .... f:):5: ,'.':,.., WtEL...L.. 1',.10: :;-:'::ii: Gr..IF:' JoB i',.Ir]~: A 1 ,:.} 8 2 r:;, ,:} :::}";:: .L-5 -.XG 'T' ! ME DA'T'E I:::'RIJ'r)HC Iii: BAY.., I',Ir)RTH SL.C I:::'Fi:., ALASKA _T)A'TE RLIN: 2,q .... OrZ:T-,.:=:2 1 .,t: 5/.I ~t 2':":, 2:7. -Nr'l',.,'...-.::::":' 'I"RLIE l"!Eii(..¥.iii:lJF;~ii]i;].] ]]R IF"I" DR!F"T' CCILI:::,".ii:E VII=RTl ...(.d._ VF:RTICAL '.E;UB'.'.5:EA R E C: 'T' A N G I..I L A R E: I .... 0 '.::i; I.. R E DC~GL.I::T.(;i~ }[:ltii:'l:::"T'H AI',.tGI....IE /."[ I RI:::CT I Ftl'q I....E:.r,.IG'TH nl.2]:::'TH F:E=C"r' I ON 'TVD F: F~ 0 I:.",.: I: I F,I A' "1' IF_' S D I '..2;'T'Ar, I-:F:' D t F:;.:I!i!:C't' I r]l,,1 .!::: !':~: v r=' F:,: ! TY F' Ii::: E T '0 I"1 ]3 F::' Iii: E T F E E "I' F" E E T F Ii:.': iii; T F'E E'T' t:::' E E 'T' D I"1 I:) G / .1. ,:":, ()F ]" :L ,:} 0,, (::, () Cl 1 ()0 ,., 10 () ,, 0'.';..~ ,::], ,. ,::) C, 2/=., ()() (). ,:'-:, o O, ':"l ,:} () ,, 00 ,:} () (), C;, () ';;.2 ':;:' 00 ,:") c) ,:":, 28,h ,:::, 25;' (')(), C)(']' c:,. ,r":, 0 '.--,,:, '.":-'/:.. o ,'~:, c:, 0,:":, ,:') ,:")0 ,:":, ,, ,::) ':.::' ':} ('.', ('), ':]' ..... u ........ ~1 .. a.~.' ¢ ...... ! u . '. . ~ . ~ ........ ':: ,:":,O,:"l 0 1. ':::~ '.:!: .,':l..,q. E :L 0(;:,, :'::'. ,:") c', ':") ,., C]'O --(), ,"]'7 "::"='.,":::'./:,,. OC)ct,. 16 '.=: 0,, 1 ::'~ I:.':: ,:") 22 '..':i: 4.'::i. ,:."]' Iii:: C 1'7:.' 7 ~" " '·" iT, '~ ii' 7 ' 7'' .......... a,iT .t " " ~' " ......... :,,L .,::../:. O0 ,:}. :'":', 1 S 0 3c:, E ,n. ,, .z~ ": :iii; ,:} lie ':'.:1. '"' · ::, .1. ,:'),.9 ':.:::, ,:'::, C:, 1 c:, ':], Z 0 (), C, O' -(), .t. 4 '"" ':,""' "t / ...... · ,~, , # 40 Q'::),, () ':::' () 5:'o0.,, .4009., ':70 .-:0,, :L 4792,.:';~,,. O0 Q ,..3 :L ...... E; 0.,.. ::':',':). E0 ,, .,'.!.::::: :!ii: .,1 .,.'.1. 0 Iii.'; (),,. !:. ') 4 :L '::':'(']'... ,, 2 C) .... N ';::"::-'. E 1 c)O... ,.. .,':l.C:,':.':'q..'.... ':::" ~:~. .. 1 ,, /..,:}.. ,,':I.,FI'.::'F......, ':":' '... ,... .1. ,, '21 N 1. . 1..':::;_ E .1. . ,:.'.':.'7 .l',.I ..a, ..": :;:::,.'.1. Iii/ ..='=', ':":, ':"). .. .... ' "':'"; !'::i I''l :iii:4 .~::~,'.'=, [ii: 1 =~':' · .q-2':::,Ct .:.."::,:"l N :'::',!:::', E :l.,::]'c']' .,':.1.1'"=.":::' '::'/-, 6 :}.':8 4..1...: ...... :=:./", 28 N 5: /'-':.; Ii-':: ,5, .,':.1./t ,,'.1. 2, 0':} '::" '=' .,::.,:: ....... :=i: .1. :;;.2 47 I',1 7 27 Iii: .1. 4 z.t ,q. :7:,:":, ':'"' ":' ..... :, 4-...., N 2 :=', E 10,r:l. 4-25:"5.'" ':-5':' 14 41 .4.""-":::' '=' N .1. ..., Iii: .... .6 .t. .......................................................................................... ,:'~. /!. ,::::, ,:::1,,, 7 ('). N .1. :E: E 't. ()(':~., 4. ':',':;'::::_. ~ , 91.. ..:.'"" ='._, ,, :'")',=: ,'"I.:::2:'"-I.._ . ,, ':.;' :L. 2:::: ,, C:,:::: .... I".1 :1.0 , '7('1 ........ E .,.."=:', ,, zt.O. I",! ';2'''.~. ,. '.=/",.... IE 1. # ..,:...... ;:',, ,L, ;,, ,' ,: :"< ,:, 5' :: .... ' :..-.: :: :':'~ ::?:/i .:,.., ,: ..... N ...... 14,',E:C:, ~::: 2,:i.::: 6(':' N 2:;:' :.:!::':i: E :L 2!:i:; '.'I "::;':":' r', E: .1. .... N .I. 8 lie .1. c.'.:,,[:)'~; :,.?;? 4-498. () . .... .:..'t ..... ..-,,:.= ..:. ,:=. 4/,Ci0 '::' () N .1. '::' E '1 ,:')'('i..': '?' ' ':"'- ~:~ ::, ~;:;ii:. :' ' ' ':':' ":';"' .... " ' ......... .q ...... ::,'6,, ,::.".", ".-, :',' ,:'.,:,'~ m--,':: .... ,=,c, :,,:'4.':;' ;' '1".! , .. _ ....,':"'"',:, ,, .......... .... '::"' E ':")# 7 ));i ....,,:,.,,..-.._t. ..... ,.,-:,..:....,., ....... . 87 :::',/-, E r::~'7 ),,1 ::.i:i ~.., ,q. 7,:}(). .1..1. c]' N 2:3 E 4/- P5:37 '77,:11) ;"58<:? .4/-'121, 37 ,. 66, C):::L:." N . ,::..., 7:.'.'-.-: E:' '70 ':":3 N :2 .1. .1. ':.:',' E"':' .1. :;ii: .... u , i~ '., ~, , ,i . . .., . .;.. ,-, (.):}) zt. :::::"to .1. 245'5 N ....':':' ' ''~ ' : ~:" "= ......... ' ., ,:,4 /-4 [ir 9' ~ 4/-, I'..i 2:2 .1. ::' Iii:',::. .... . ... . ,:.,.... E 1 (),:..).,' :.:. 4, w:-:,... 2>'.... 91 !;' ::1.",:t,:>'''' 'ii!';:,:l.? i '..i:, ~: 22:1' # }.':14 N .34, , .. _, ., , . 4'::¢,:"1,:"]' .................. :1.4 :'::c) N :7::Xl. l:::' 1()() .... "'%'ii:.2:90'::'/.I.C]' ..... ~' 1_1_'4;;': Z '':'?., .'>a.';:,a ¢.:'"'~.,_,,, ............... ~.c]':"':"'"'"':lO,-'l· '''''-':,.:, ........... N 4~:,~ /,'¢ FZ 1 .1. zf. .... -7,:,, .tXl :2.q- :7_:: lie 2.'"'"'"~.... !':: c),:")':") ....... , 15 ....... 4!:::i I\l .,q.O EE .1. c]'('l ~ ,~q. ':.> ::: ,,'..,, .... = ,:>a.. .,_140., :.2:;'..:_' .4912. ,5'4 :I.'""':::',::...,./:,5 .... N /-.2. 4.'.':, Iii!: !;1. o ,32 N 26 2,'--. E 5 ! ':;:." O. .1. 'ii:' 1.5r.,I :}.':'7 E." .1. ()O. 5 C:, 8 :;;:'. '..5= 5:' l -': ':.'.'. '7 :.2: !""50 ti, :.2: ,, '5',.:.':, l 4. !.:,'..1. :iS: B! :.2: :[, 18 E' .1. 6'i..'.' ,, :.2:4 N :iii: :3 3 :iii: tiE '=;9oo.....,....._ ,, 1 '-.':". .1..=;.. I',-! 2,/=, IE .1. o;")...., 5:';1'76,_. . .7o.. 2'::],_';5:..' ,/',(') .... .:.,":'.1. 02.7() .1.77,,'::'5., .... N 5:':=: .3::.3 [.'i 2,:"~';:: ,, 'v2, 1"..I ..,...':;"::'.. ';;.2 t:i:' '='"" ......... ': 5/7, -':';",/, 70 t",1 1 :L':;i: 7,.1. I'-.5:-'""'""'=' .'.'~./.I t',.I .... '"'" :37 ....,'-'"',:"lc:,.., ....... .1. '? ':":, 1'..I ':::'/- E .1. ,:':,() ...... : 71 ., 't :.2: :..":.::5, '-"= .1. .1. ::2: ....... ,.' .".. ,. ~ , .. . ._1 n · ~ ..... .~ ..:,._{ .~.... _ # . .. 5 4 0,::) '.';!: 1 ,:"i N "':'/, E:' .1. ()(')# ":'"' ":' '::' ";."/- ':" .,=..r...- "="i'.'::":-' .1. ,, .1. F;4' N 2 7 N '"' E: ............. .... ,.-,/- ..... , .... 1 .................. .,..,.., ..- 2.:: ..: 7. ,, .,".! 1. , 7. :7:: I."-:i 2 6 9' ,, ,/=, .1. 2',""!: .1..,' 265:'. 65:' I',.1 :2:,:} 2, ,:'~ 2 I',1 :2:::"::.".I-. !5/_-, hl 3/=,7.8 ! I,,I ~1.(':':"-':. 2 .1. N 14:.5:. ::-: 1 E 1,/_-,,:]).6,.,'.! E: ! 77.9,-.'1. IE ! 5;' 5. ,/=,:2: I:.':: 215.2,':1- E '-' .,::. ~, .. "::' /- '1 :7::./= '.'3 O. :::'!1.5; · 5=, 0,:} ) ,:::.', ,, -,'.1-4 O. 4.4 ':"). ~c.._, (-) -.: :.- '2. :3'7 ,':!:,O ()O. ':;:' 7 ]..5 N :iii:::ii: E: ,',!:, :1. O':'-). :2: :1. !. :5 iq :'2:6 I::_' .'.':,2'::)0. ::ii',::.=:', ,:'.5 N :37 E: /:. ......... :=:':-)':-) . ...,"::'.._,/- :.5:':") 1',I :.5:'2. E ,:!:..,":.!.'::;:' 0,, :37 .1. 5 I'q :2',';;" [ii: 5':} 1. '::]'7 5:'-":4.4., 2,'.5., ":' x, ,=., ,"=; (-, '='"' :.2:1 ,., .':5 ('l ._1 . = ._ .. ._1 A C) :,.-.:', F:; (] /-, ,:'l ]. F-', """" ............ u 6-5 9. ,:} 7 .6 ,:} 9'7.6 ~ ._ 71 :.2',. 4 7 6 .1. 7 7.6 () 4./.! O. ? 1. N 2:2::--:. 3'.'"'; E 4 8_t. 1 '7 1',1 ,. ,_,,_,'=' L L. el_ 2 IE 5:2' 4-. :7:: 6 N 2'.=.'7.97 E 15'70. O O N 3 :}'.',:.5',. O ('i IF' 6 '15:'. 1. :2', Ix! :2:67. 4-,::1E ,'i,,:}:7.:. 1 1 l"..] '75:' :.5:,"f, IE C.,'::,C!. t4 N :':!:O :!.:!:2', E '7 ! '5;'. 5;':3 tx! 5 ,::)-4. ! 1'.-7 ':.2:. 4.'::) 4.. 2,"_", ':2:, 56 ;;'~ '='1 ~ ,_, · =,../=, :E', :' R LJ 1:)H 0 Iii: B A \/ I',l 0 R"I" I".1 ::3 I.... 0 F::' E., A I_ A S 1< A .... ' .... .. · , IJA I c. R. IN .'. 2.q .... OF:T..-.:FC2 14.: !:':;.(.t. ,", 20 2::?,--"NOV"'-82 "lli--A::: IpE'r'[ Z!RIF'I" ENII::T C:('.:LIF;:f::E: VE:I..,I lC:AL. VERTIC:AL. '.:i:LIBf::[..:'A L] E: F::' "I' HAIqGI_E' D .!: Rlii:(: 'T' ! 01',1 I...ENGTH DEF'"I'H SI:.]:C'T' :1: ON T'VD .C 0 0 R D I N A 'T' t.'.-'. '.--; .!"~ I S"I'(..'fl'qCF." !"~ :1: Rt!!:CT I ON '.iE;I:-'i:VER T T¥ I:::' IZ liE: 'T' D I'"1 Ei F E E T F' E: Ei:"l" F [:-'. ...... ,('.':,'/-':,00"~ :'_:i:,i::,' '3() N :]. 9 E lOCi', /:,~l: i,:}',94: -15::iii:~ 6L:'," N E: .:.!:zl (}, C)(') N '..]::'P 5() ' E:_"' :B"' ii'7 ~. .... ¥ 0 () . ....,":' ".., ("~ ......... N .1. 9 E" .1. 0 0 , z.. zl. 91 , ._':"': ,...,'::' 8 9'7 .5. 4. /-,_/.I- :1 '7 , r-'; ..... ::::: 7' 8 4 . ~':':,6. N /.I.:'::r7 , .1. 7 E '_,:":.)'.....', 1 4 N .,_"::' '::.".. 8 Iii: 0 , ....'::'; 0 .. ':'0o '::5 15 N :L 9 E: 1. O0 /.::.':'"'W2. ::: .4, '"~'"'"":::~ ................ ~- "'"'~:;':":; 5,'.1 7 .... ........ . ........ : ....... 22 /-,4':.~::', :::F, ',:',:::9 64 N 4o6, 14. E : ......... N 28 3.1. Ii::: ('i.' /. q:',:") (") , 34. Zl. 5; N 19 ' I:.':' .1. ili 0, 6/.-.!i:: 41,7 L:: ()i'2 ili z ....... , - ...... ..,, " ....... [ ,.:,.:,,:,o. /,::, :::9::::,:':.:.:'7 N ................ 47z1:: ?-'i 1Iii." i'0].:2 ii 15 N ::11:'7 !!5 :') Iii." '7':::',:}c~ 32 ,:") N :1 9 Iii!:' 1 ()() z.. ,::.'~c)zt 32 1. 1 '7/_-, '"'= 6 ',!::', :7:: () , :::.::7.: 1. ()51., 28 N ="Z'9 _ ,, ................. : ........... · -.. ('~ 1 E 1 17 6 ,, :!ii:7 N '7? 6 .q. :7-'. [ii: _1. 5 o '7 ::ii', ()0 :--: :L 0 N 21. 9 E .1. C)0 6,':a ::: 9 '::;,:, ":,.":,,::, ,=',':, /.. 9 ~;: ............ :, 1 .., :: 1 5:8 .1. 10 0 ,,'~':, N 5; 4/. 07' E ! 2 2 8 ,./:,'7 ..... ~- ....... . ..................... N 2 6 2:3 Ii.:..: .1.., 0() '7".1. 0 i"~ 30 ~t i ~i :9' 'i:':' i (iO ~ ............ 70"75 ',~' z.: 3 ....... i:'77"? ,'i} 3 .......... 7 0 0]. ~' i..: B .............. 1 ii Z iF!,,',8 4 IXl 5 6 2,'6i5 E 1 '27 9 2 0 N 2,!, 6 E 9 ~ 7 5 · ,/',., / .... z. 7.7'? 1. 1 _. _ Ix} 66::::, ::'; 4. E t 5/',/-, 3 :"':: Ixt 2 !:5 1 (").. (")., '76 01 ,, '79 :l.' ....... .... ': , ...,...,z..7, '" ':::'"'"-4 /-, !=i 4 . .... ......... :L 6 El 1 o. {"~ . '7/-. ..... 9 c),, ':~. 9.16 .1 c~. ,, h :3 .... 7/..,.. i .5, . 'Z,.. ,::~.. 14 .--,A.. 64 N /-._ :::::_ 9. · al, E: 1 .5,1 :1. . ....,':':' ...,'::' N ~:"=..., 20. E' 1 (")(') '778 () 77 1 65:'; 4,::'-' .... ~'- 7'7 (')/.., 77 J. 4 '-'-'~:~ :::z~ N 7 .1. (') 4.2 E:' .1. · "?-":::' p:i_ :L t',.! "" '= .... ":::' 117 · - k I~ .... I~ . .* Il . , '.,. ~ II J~'t .I,.J ii ,.,::, ,__l..1::. ,.,I 1 (')C)_ _ , '7',::: 7. 1 , 4.,"~.... 1.5,97 , el'::._, 7797 ./.[(-)_ 1S:;:':: .... 1 ,, ':):3.. I"1 7:2,1 . .'=_,._ =, E 1/". 9'7 ,, :.':,.q. i',,I .,::....,'-': :]?, :2: [:-'- 1' (::~ (2)'' ' r'l~?'P6':~i:' ~'~:~ ~ 7:2:'7 '::).11 ............. 7::"i?.:'5'' ii:):2:'' .1.'56.5,,, '! ':} N 757'':" 4'9 E: 1. '7 .''.'r'?. 50 N ]:5 ':1''"'') I:::' :L, ].7 i ,, 7:5: 1,7:3.': :7::.', 99 I, '? 9 ! (.)("). 8 5 0 .1.. 8 0 ! 9 8 9.8 6 ::: 4':? 7,8'."_) 1. 7 60, 8 6 N 9 2: 7. ! 2 E 1. 'il) 5) '.'"). 0 2 F.! ::i:'7 4- ,":, E' 10'.'"), 858'7, :::.5, 2 C)37, ! (-) 8 !51:3, 86 1794.. 28 N 965.5,'5, E 2 ("):2:'7,59 N 2 :i?, 2t. '7 IE 10,:'~ :--:6,72. ::"-'~ '-'C ']'5 - .... , ................. .... ,-.)-,.',.9(_') :::,.=,,.}:::.:::c~ 182:E: :::,'.') Ix} 1(')(')5 2:--: E." '::' i") ::: /-, :::':> I'..! :,7...'::-': 48 E 1c'0 8 ':757 11 21'-' '= 9(') '.:'/- ' = - - · ~ . .-_ .... . . ,_,,_.:---::2: . 'I .... 1 1.:--:6,-.'I. . 1'7 I',.I 104 .... ':;7 b- ;.'-.':1':'''7._,: . .?57 1",I :2':"... :1.::'": I:--_. 100. :::84('), 8/-:, 21:--:6,, 58 ::_:76,(:,, :--:6,1900. 02 N !0:::7,:7.::1 E': 2].',:i:9,09 I,.! '25),'17 E: ~. .. ~ * ·. ... ..... ", O, :,.,-.-'. ~ ~ .~ c, ~:~ .":,- X (} T I M E D A T E ]'.:::; 6? WIEI....t .... IHO: 23 GMS dOB NO A t .... "-'""t ......... '~'" :::'RLIEH...IOE BAY, IqOl:~]"H SI_OPE, AL..ASK~ DATE RUN: 24-0CT-82 14: 54: 2() 2::~:-IxlE~V-82 '1" R I..I Ii!!: 'd lE A '.ii;; L.I F:;: E; :O I]F:;t!FT I]RIF'T COl. R::"i:IE VER'T'IE:A.L VERTICal._ !) I:..'-'; F:']? .:': A "!.!':i -Iii; !;;! 'r F.'< !:i CT I E I', !;:! T !':'! ........ !:!E!~;.]]H '.:-:.; !~i !..E; ],.! 0,1~! ]] v I;;! !;;..dj...0.... !] :[ I~! ,~ .....T.. E. :]; !'). I S T A !",1 CE I::, :1: R E,:::: T :1: ,:::, !q '.!ii: E V Ii" R I T Y F:' E [.-- T I:) M I:) F E I.'i."l" F E E 'f' F E E T F.' E E T F:.' E E' T F E E "1" I:) I'1 !] G / :L () 0 F- 'T I:::' ;f NAI .... (';:I....O:F:LH::(17 ..... ~[::11 REC'F ! '"iN" , :(:;~ I :!.:.'; T A N C E: N :"i:,!?!~;q';.;IE:'¢:;S 4.¢~ :! M I NS 19 SECS E ' :-' R i...i y)H 3 E B A Y: l',] 0 R "I' I'"I ::"i: L 0 P E ~ R L A '.i::; K A .E A 'T' F' R l_l l',l .,1, 2 4- r-' L": T- 8 2 14.: ::: ................................. M A R l.':: E R ............................. T R U l":i] S U B S E A F" EI}""L"I' F E E T I::: E E T I::' E E'I" F E:'I"""i T I::' E E T ]] I"1 G /0 cor',I'T'ACT MOVli.:.]:) "l"r" ,:::.,"::,':". , .. ,'"l.. ....... ,:':,,:.'} :E:'715, ()C:~ ':=,'""='......:,..., ,, ,r':, 8641 , ,r':,,:":~.. .1. 8/!../:, ,/.I.'~.;' I',.I .1. ,:.:,.,::..:,'"" ,,/..':.:2'.. IF :;;..:' 112 .21 N .,_"::":::'.. ::ii: E 'T'OF' Z r'.: I',IE 3 ':.:':'::8:1.. O0 8824, ':.',, !'":i 5' =' ' ,, '1. '""-' ": .... . ...... ., ...,,":, ,::, 7 ,..., .............. .,:. '_1 ....... I',.! ":'o .4-i E I'.'I (:)'1" '.:.:, ./-:/_.: ,7:,. 0 0 5:' 0 ":':i 8., 2 9 6 () 1.7 8 9 8 4. '.':i: 9 19 9 5::. 9 8 I'..I 1 19 4.. 41 E 2 3:7:?.,'1-, :iii: 4 I".1]:: 0 !:.!:. !:::i E i::illI ':'i.!'; l). ,l.: ~ ,i: ,. ']/W CON'I"AI::::T '":'"-',:::".:: :5:.:.:' :'"'"/-:,05.':,; 5.'"" ::'9:0:~:!,31',,.53 :? r'f2002 . 42 N :1.2':..":::. 7b: E. . .. ~..., ..... # : ~ ~i.;.... ~ .., ; . · ':... 9707 ,, "'" .... '""'-"::' ..... ,_;l......l:, ,.I~,......,,l;..,l.l::.:..,.,,'l....' ,:l::'. .... · ,.:l..,. ,'. ,.,....,' =.....', . '. 3':1:'~:'::' '::( )':; 2' '',,'',."l'l.l.:,.'.l:.::/',(') 9' ':4' &'"O ''"'"''''':'0' ....... "; ':U 1 I ';:%':'' ~ I"'1l' ' :.l'''': ['.>" ':' :[ '.' E:.: Tf:)l:::" Zl--[l""l[:" .1. B .............. 't "'"', ' '" ,:a'1 BA'~.i;li::: SADt--EI'~EII:::H :r_ T 5:'7',i::',:'.'i:. O0 .1. 60 ,, :::::8 /_-, :;..':..' :;;:.:'::.;:~ .1. {'::i ¢,-.".-"08/..:,",,.!88 .12040. 3:::: 1',1 :"124:':: .: ':T,' :2 "i;: tE .. l....:.. :; c,,. ,_,,.:..,, ._, ..-,,...,. ", ,::,":.:::i ..: "71.; '*,:.:r. 5 ~.~?::':...., ;- i=: c,.-: .... ,.; .:.:;. ..... I:::'BTI-:I ,::;,,,::.::,,::., O,U.:::;.i ::. 'l :., :: ,-lo .,.l/::,.,::. ::, :,, .': ,. :~,l;,. :: a~ .'::.'--:"' .I. '.:.' ,,::.".)'..:'--', 1 '4' N ;, ::t.-,:..~'.,: '."U'' [::. "t" }':1 ,-:., ,--l "'..: C' :.7 ...... :=: ..... :..~' (..:' '""< '" :":';"":'".,".-'" 2',, ...:' .7 6 '""--'"7 ':'::'",, ~,,. :i::':'Ei' ,~'":. '1. ~:.: :.'....,:l..:., ,' ,'t ;' '/.'i,. ,'¢',..I "i .:'. :':' l','t.i," :':, ,"",: li ' ~ ~ ~ ~ i _ ~ ~ _~ ~ ', .~ : _~ .~--~--f . , I ~ : ~ _ ~_~ _ · : := I · ~j ' ~ - -~~ .~-] ' ' ..... ...... illl I ~ ...... [ t ~ , - -~--~- ~ ' i i i ~ ' ' · - , I m . : : , , , l~ , , : ~ l II ~ . , , . ~-- ,-= --~ ; , : , - _ ~-.~ -~-T~ ~ ~---~-. ...... . ~ i , ~ i ' ~ : I I ' ' : ' : : ~ .... · . ~ 1 I ..... i :- i i- ~ i , ~ i i-~ ': ~ : ' -~'---~'-~~7- ~ i ' .... i ; ! ',' ' ~ ' : : I · : ;~ ~-ff~ i _ _L_. f f i Suggest~ _~m to be inserted in each "Ac~ well folder to d~eck for timely compliance with our £C~ulations. Operator, Well Nan~ and Number Reports and Materials to'be received by: //- ~, · Date Required Date Received Remarks Completion Report Yes /~'-' / Well History Yes - _Samples . .. d/~ P~. ..' Core Chips //~/:/$~: .__._.____ Core Description Directional Survey ? -~. '~ P/ Drill Stem Test Reports ./~//~/~/~_ , , Prcd~ctidn Test Reports Logs Run. Yes Digitized Data ~x...~. ,~.. y~' ~.~_ ARCO Alaska, Inc. Post Office [ 360 Anchorage. A~aska 99510 Telephone 907 277 5637 November 23, 1982 RE' ARCO Cased Hole Finals D.S. 1-8 10-24-82 CH CNL D.S. 1-22~ 11,6-82 CBL/VD D.S. 4-1,~ 10-30-82 CH CNL D.S. 5-7f . 10-26/5-14/10-22-82 CNL Gas Monitor Log D.S. 5-7 ~'- 10-22/5-14-82 CNL Gas Monitor Log D.S. 5-7~ 10-22-82 CH CNL 13. S. 5-14 ~'~ 10-30-82 CH CNL D.S. 5-12~-~'' .10-23-82 CH CNL D.S. 6-23 f 10-21-82 ACBL D.S. 6-24~ 11-4-82 CBL/VD D.S. 13-5f 8-20/11-1-82 D.S. 13-15/ 10-21-82 D.S. 13~--~10-3-82 ~ 7-22-82 D.S~'8-10 ~' 10-21-82 Run 5 SCH Run 1 SCH Run 6 SCH Run 3, 10, & 11 SCH Run 10 & 11 SCH Run 11 SCH Run 3 SCH Run 7 SCH Run 1 D/A Run 1 SCH CH CNL (CNL Monitor Overlay) Run i & 2 SCH CBL/VD Run 1 SCH ACBL Run 1 D/A Spinner Camco ACBL Run 1 D/A Please sign and return the attached copy as receipt of data. Becky Benedi ct AFA- 403 Trans. #625 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO -' MARATHON · CHEVRON EXXON MOBIL GETTy D&M STATE OF ALAS~.~~ DALLAS Post Office Box 360 Anchorage./'-~aska 99510 Telephone 277 5637 November 15, 1982 RE: ARCO Open Hole Finals D.S. 13-15 10-18-82 10-15/18-82 10-18-82 10-18-82 10-18-82 10-18-82 10-18-82 10-18-82 BHCS - GR SCH DIL- SFL SCH CPL/Cyberl ook SCH LDT-CNL-GR (Poro) SCH LDT-CNL-GR .(Raw) SCH Fracturd Iden. Log SCH BHCS Waveforms SCH High Res. Dipmeter SCH 2" & 5" 2" & 5" 2" & 5" 5" 5" 10" 10" 5" D.S. 18-10 10-14/18-82 10-18-82 10-18-82 10-18-82 10-18-82 10-18-82 DIL - SFL SCH CPL/Cyberl ook SCH BHCS' - GR SCH Dual Laterol og SCH FDC-CNL-GR (Poro) SCH FDC-CNL-GR (Raw) SCH 2" & 5" 5" 2" & 5" 2" & 5" 5" D.S. 6-23 10-17-82 BHCS - GR SCH 2" & 5" 10'17-82 DIE-- SFL - GR SCH 2" & 5"  -FDC-CNL SCH 5" 10-17-82 (Poro) 10-17-82 FDC-CNL (Raw) SCH 5" P~'I eas . 10-17-82 CPL/Cyberl ook SCH 5" e sign and return the attached copy as receipt of data. Run 2 Run 1 & 2 Run 2 Run 2 Run 2 Run 2 Run 2 Run 2 Run 1 & 2 Run 2 Run 2 Run 2 Run 2 Run 2 Run 1 Run 1 Run 1 Run 1 Run 1 Becky Benedi ct AFA- 403 Trans. #613 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALASKA ,~ ' lis. 4n~nOrage O°ma~mS~on ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldComl)any ARCO A!aska, Inc. · Post Office 360 Anchorage, ~,aska 99510 Telephone 907 277 5637 November 12, 1982 Mr. C.. V. -Chatterton Commi ss ioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject- State Reports Dear Mr. Chatterton. Enclosed are monthly reports for October on these drill sites' 1-21 18-7 1-22 18-10 6-23 1E-26 6-24 1E-27 7-15 1F-7 13-14 1F-8 13-15 1G-4 WSW-4 WSW-5 WSW-6 Also enclosed are well completion reports for: 1-20 1G-2 6-22 1G-3 13-16 WSW-3 1E-30 The survey for 2-22 needs to be reran; a completion report for this well will be submitted when an approved survey is received. We also are including subsequent Sundry Reports for 1-20 and 13-16. P. A. VanDusen District Drilling Engineer PAV'JGOI'ltc Attachments NOV Alaska Oil & Ga~ Con~. Cornmis~.ior~ ncnorage ARCO Alaska, inc. is a subsidiary of AtlanticRichfleldCompany - . STATE OF ALASKA · ALASKA''~-~''. AND GAS CONSERVATION C(~'"'MISSION MONTHLY REPORT DRILLING AND WORKOVER OPERATIONS 1. Drilling well ~-I Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 82-133 3. Address P. O. Box 360, Anchorage, AK 99510 4. Location of Well atsurfaoe 702' FSL, 985' FEL, Sec. 2, TION, R14E, UH 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 74' RKB] ADL 28311 8. APl Number 50- 029-20808 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 6-23 11. Field and Pool Prudhoe Ba~v Field Prudhoe Bay 0il Pool For the Month of October ,19 82 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks : !Spudded well (9 2100 hrs, 10/01/82. Drld 17-1/2" hole to 2541'; ran, cmtd, & tstd 13-3/8" csg. Drld 12-1/4" hole to 9025'; ran, cmtd & tstd 9-5/8" csg. Drld 8-1/2" hole to 9863'; ran logs; Cont drlg to 9875'. Ran, cmtd & tstd 7" liner. Ran CBL. Ran 5-1/2" completion assy. Secured well & released rig @ 0930 hrs, 10/22/82. SEE DRILLING HISTORY 13. Casing or liner run and quantities of cement, results of pressure tests 20", 91.5 #/ft, H-40, Weld conductor set @ 79'. Installed w/1990# Poleset. 13-3/8", 72.0#/ft, L-80, BTC csg w/shoe @ 2525'. Cmtd w/2400 sx Fondu & 400 sx Permafrost C 9-5/8", 47.0#/ft, L-80, BTC csg w/shoe @ 9016'. Cmtd w/500 sx Class G & 50 bbls Permafrost 7", 29.0#/ft, L-80, BTC csg f/8697'-9870'. Cmtd w/325 sx Class G. SEE DRILLING HISTORY 14. Coring resume and brief description None 15. Logs run and depth where run DIL/SP/BHCS/GR & FDC/CNL/GR/Cal f/9863'-9016' CNL/GR f/9863'-2525' CBL 16. DST data, perforating data, shows of H2S, miscellarteous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate -~-'" DS 6-23 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well @ 2100 hrs, 10/01/82. Drld 17-1/2" hole to 2541'. Ran 63 jts 13-3/8" 72#/ft, L-80, BTC csg w/shoe @ 2525'. Cmtd 13-3/8" csg w/2400 sx Fondu & 400 sx Permafrost C. ND 20" Hydril & diverter. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - press, leaked off. Drld FC. Tstd csg to 1500 psi - ok. Set 13-3/8" cmt retainer @ 992'. Drld top slips of ret & pushed downhole. TIH & tagged ret @ 1699'; pushed to 2444'. Drld & pushed ret to 2525'. Drld on ret @ csg shoe. Drld ret & FS - pushed junk to 2534'. Pulled up into csg; squeezed shoe w/250 sx Permafrost C. TIH & tagged top of cmt @ 2268'. Drld cmt & 10' new form to 2551'. Tstd form. to 11.1 ppg EMW - ok. Drld 12-1/4" hole to 6590'; stuck pipe & recovered. Cont drlg 12-1/4" hole to 9025'. Ran 219 jts 9=5/8" 47#/ft, L-80/SO0-95, BTC csg w/shoe @ 9016'. Cmtd 9-5/8" csg w/500 sx Class G. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 9863'. Ran DIL/SP/BHCS/GR, FDC/CNL/GR/Cal to 9-5/8" shoe, CNL/GR to 13-3/8" shoe. Cont. Drlg 8-1/2" hole to 9875' TD (10/18/82). Arctic packed 9-5/8" x 13-3/8" annulus w/300 bbls H20, 50 bbls Permafrost C & 125 bbls Arctic Pack. Ran 30 jts 7" 29#/ft, L-80, BTC csg f/8697'-9870'. Cmtd 7" l nr w/325 sx Class G. Drld cmt to 9829' PBTD. Tstd lnr lap to 3000 psi - ok. Displaced well to NaC1. Ran CBL. Ran 5-1/2" completion assy w/tail @ 8754' & pkr @ 8643'. Top of tieback sleeve 8689'. Tstd tbg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Displaced tbg to diesel. Dropped ball & set pkr. Nipple for SSSV @ 2093'. Secured well & released rig @ 0930 hrs, 10/22/82. JG-11m 11/09/82 ARCO Alaska, Inc.,~.~ 'Post Office 360 Anchorage, A~aska 99510 Telephone 907 277 5637 November 3, 1982 Reference' ARCO .Directional Surveys D.S. 1-21 10-1-82. Single Shot E/W D.S. 6-23 10L6--82 Single Shot E/W D.S. 18-10 10-2-82 Single Shot E/W se. sign and return the attached copy as receipt of data. Becky Benedict AFA- 403 . Trans. #591 DISTRI-BUTION NORTH GEOLOGY R&.D DRILLING PHILLIPS SOHIO MARATHON CHEVRON MOBIL NOV 0 GEl-FY D&M Alaska Oil & Gas Cons. Commtssba Anchorage STATE OF ALASKA DALLAS Anchorage, Alaska 99510 Telephone"q07 277 5637 October 27, 1982 Reference' ARCO Magnetic Tapes with listings D.S. 13-16 9-30-82 Run 1 DIL/BHC/LDT/CNL/CH CNL Mag. Tape #ACC 65654 D.S. 6-23 10-17-82 Open Hole 'Run 1 Mag. Tape #65735 D.S. 14-9B (Corrected) 4-10-82 GR-CN, BHC AL, CDL Mag. Tape #ECC 1275 D.S. 14-21 7-7-82 CN/CDL, DIFL-BHC/AL Pass 1 & 2 Mag. Tape #ECC -1400 e sign and return the attached copy as receipt of data. SCH SCH D/A D/A Becky Benedi ct AFA- 403 Trans. #586 Note- Please see attached letter from Dresser/Atlas regarding the corrected tape on D.S. 14-9B. DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA · NOV 0 3 ~::~Z Alaska Oil & ~as Cons. Commission Anchorage MEMORANDUM Sta e of Alaska . ALAS~ O~,,L AND GAS CONSERVATION COMMISSION TO: C. ,~' ~~erton DATE: October 11, z 0 ~onnie c. Smith ~/'- z · k Thru: C~mssloner ~ .~~~LEPHONE NO FROM: ~n LeNo~r~n ~troleu~ Ins~ctor 1982 SUBJECT: Witness BOPE Test on ARCO's DS 6,23 Sec. 2, T10N, R14L-', U~-~, ._Pru~dhoe Bay Unit S_unday, Oct_ober 3._ .1.982 - I departed my home at 6:00 a.m. for a 6:25 a.m. showup and 7:25 a.m. departure via Alaska Airlines flight #55 for Deadhorse. Accompanied by Harold ~Jedlund, I arrived in Deadhorse at 9:05 a.m. Weather: +22°F, light snow, light wind. _ROPE tests on DS 6-23 began at 7:10 p.m. and were completed at 9:10 p.m. BOPE inspection reuort is attached. ~gnday,. October 4,..198.2 - Standing by on ARCO's ~,uparuk 1F-7. T_uesday_, October~5,__ 1982 - BOPE tests on ARCO's Euparuk 1F-7 completed, the subject of a separate report. BOPE tests on Sohio's A-28 completed, the subject of a separate report. ?,?edne_sday, O~ct_ober 6.1 1982 - BOPE tests on ARCO's DS 1-21 completed, the subject of a separate report. I departed Deadhorse via Alaska Airlines flight ~66 at 9:45 a.m. arriving in Anchorage at 11:25 a.m.. and at my home at 11:55 a.m. In summary, I witnessed successful BOPE tests on ARCO's DS 6-23. Thursday, October 7, 1982 - Bill Chilcoat advised a new check valve will be installed on receipt of sa~ from Anchorage. We will be advised at that time. _. O2-f)O ]/%f Rev.lO/791 #4 STATE OF ALASKA ALASKA OIL & ~AS CONSERVATION CCFJTISSION B .O.P.E. Inspection Report Inspector 0peratorj- . ~~ ~ Representative Well ~)~ &~.~ Permit # Location: Sec ~ T/D/~R/~..'M OF~ /~~sing Set Prillinq Contractor /~6u_~,4 Rig ~Sepresentative Location, Genera] Well Sign Ceneral Housekeeping Reserve pit BOPE Stack Annular Preventer Pipe ~ams Blind Rams Choke Line Valves. H.C.R. Valve- Kill Line Valves Check Valve Test Pressure ACCUMULATOR SYSTEM Ful 1 Charge Pres sure ~ OO ~ Pressure After Closure 7~ F~ Pump incr. clos. pres. 200 psigo psig psig min /~sec. Full Charge Pressure Attained: . ..9, min ~--~%ec. ~ ~ ~j / ~'~ ,~,.~ m / ,FD.,, ,..~ ,~, ~, , -' N 2 . ./ ~ o ~, ~. . l .; ~"~ ..,',.~ ~ ,~,,, . . .~ / J-6 psig Controls: Master . ~)/~ Remote ~ ~ Blinds switch cover %/~. Kelly and Floor Safety Valves · Upper Kelly. Lo%~r Kelly. ype. Inside BOP ~3 .~_ Choke Manifold No. Valves ,. _ No. flanges Test Pressure. Test Pres sure .Test Pressure Test Pressure Test Pressure Adjustable Chokes Hydrauically operated choke Test Results: Failures .... J Test Time~ ~, , hrs .... Repair or Replacement of failed equipment to be made within_, ~ days and Inspector/C~mnission office notified. , Distribution orig. - AO&G~C CC - 0perahor cc - Supervisor August I9, 1982 Mr. Mark A. Major Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 360 Anchorage, Alaska 99510 Re: Prudhoe Bay Unit DS 6-23 ARCO Alaska, Inc, Permit No. 82-133 Sur. Loc. 702'NSL, IOIO'WEL, Sec. 2, T10N, RI4E, UH. Btmhole Loc. 2907'NSL, IIS'EWL, Sec. 1, TION, RI4E, UM. Dear Mr. Major: Enclosed is the approved application for permit to drill the above referemced well. Well samples and a mud log are not required. A continuous dir~etio~ai survey is required as per 20 AAC 25,050(b)(5), If available, a tape contaiming the digitized los information shall be submitted om all logs for copying except experimental logsl, velocity surveys and dtpmater surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator' Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Adminimtrative Code, Chapter 70) and by the Federal Water Pollution Control AcT, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, we would appreciate yoar notifying this office within 4~ hours after the well is spudded. We would also like to be notified so that a representative of the Commission may be present to witness Mr, Mark A. Major Prudhoe Bay Unit DS 6-23 -2- August 19, 1982 testing of blowout preventer equipment before surface casing shoe is drilled, In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, C. V. Chatterton ~,.,,.~_ Chairman of ~y OMDZH O~ ~E G~...,~$1O~ Alaska Oil and Gas Conserva~ion Commission Enclosure Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl, crC:be ARCO Alaska, Inc. Post Office B,_ 360 Anchorage, Alasks 99510 Telephone ,907 277 5637 August 11, 1982 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, A'K 9.9501 SUBJECT' DS 6-23, Permit to Drill Dear Mr. Chatterton' Enclosed is our application for Permit to Drill DS 6-23 and the required $100 filing fee. Attachments to the application include a plat detailing the sec- tion and plan views of the proposed wellbore; a proximity plat showing the subject wellbore's position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Sincerely, M. A. Major Area Drilling Engineer MAM/JG · llm ~nclosures ARCO Alaska. Inc. is a subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA O,~ AND GAS CONSERVATION CO~,.MISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work. DRILL ~( REDRILL [] DEEPEN [] 1 b. Type of well EXPLORATORY [] DEVELOPMENT OIL ~0( DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE ~ MULTIPLE ZONE [] 2, Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 360, Anchorage, Alaska 99510 4. Location of well at surface 702' NSL & 1010' WEL, Sec. 2, T10N, R14E, UN At top of proposed producing interval 2631' NSL & 26' WEL, Sec. 1, T10N, R14E, UN AUG 1 8 1982 At total depth 2907' NSL & 115' WEL, Sec. 1, T10N, R14E, UN Alaslm 0il & Gas Cons. C0mmissi0 5. Elevation in feet (indicate KB, DF etc.) 74' RKB 37' PAD 6. Lease designation and serial no. ADL 28311 9. Unit or lease name Prudhoe Bay Unit 10. Well number DS 6-23 11. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Bond information (see 20AAC25.025) Federal Insurance Company Type Statewi de Surety and/or number #8088-26-27 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 3NW - Deadhorse miles 2381' from ADL 28308 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9821 ' MD, 9226'TVD feet 2560 I KICK OFF POINT 4000 feet. MAXIMUM HOLE ANGLE 28 ol I Amount $500,000 15. Distance to nearest drilling or completed -22 well 120' ~ surface feet 18. Approximate spud date 10/07/82 19. If deviated (see 20 AAC 25.050) 20. Anticipated pressures (see 20 AAC 25.035 (c) (2) 3448 psig@__~ Surface 4200 psig@ 9211 ft. TD (TVD) SIZE Hole Casing pO" 20" 7-1/2" 13-3/8" 2-1/4" 9-5/8" Weight 91.5# 72# 47# 29# -1/2" 7" Proposed Casing, Liner and Cementing Program CASING AND LINER Grade Coupling H-40 Welded L-80 IBUTT L-80& IBUTT S00-95 IBUTT L-80 IBUTT 22. Describe proposed program: Length SETTING DEPTH MD TOP TVD 80' 37' I 37' 2464' 36' I 36' I 7998' 35' 1000' 8033' ~ 35' I 17649' 1088' 8733 18266' I MD BOTTOM TVD 117'1 117' 2500,I 12500' 8033'17649' 9033'18531' 9821'19226' QUANTITY OF CEMENT (include stage data) 1990 # Poleset 2300sx Fondu + 400 sx PF 500sx G 1st Stage 300sx PFI 2nd Stage 400sx Class G Cmt ARCO Alaska, Inc., proposes to directionally drill this well to 9821' MD (9226' TVD) to produce the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack will be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17# L-80 tubing, packer, and gas lift mandrels will be run. Provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. The packer will be set above the Sadlerochit. A Sundry Notice will be submitted when the well is to be perforated. A surface diverter will be installed and operationally tested prior to spud and at least daily thereafter. 23. i hereby certify that the foregoing is true and correct to the best of my knowledge  ~' Area Dri 11 ing Engi neet SIGNED /'~" ~ TITLE The space below for Commission use DATE CONDITIONS OF APPROVAL Samples required I Mud log required t--lYES '~NO ~]YES ~NO ~nu~-- I .Approval date GRU1/PD16 / / / Directional Survey required ~ES []NO APl number SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE Augu,~ t by order of the Commission Form 10-401 Submit in triplicate . ~ rI.r~, ~ ' ,-' ~ ~-+-'~' t'~ ~-~-r ........ ~ ....... ~ ...... ,.~ ....... · .... , .~-~ .... + ........ fi. ~-~., ...... ..4.~....'_ ~.~ ~ , ,~ ~ ~ , : Z::::'I~'Z:'~Z "Zi:;~i'~'' ~ ..... ~- r ~r -+ ...... m- ~*.rm..~ .-~, -~ ~ .... ~. ~+~.~.'..:-~j~Z.- ¢..4. *~.- ~ ~.-~ ~ .... ~ . :}Z . r . . * . ;~ .. ~..~. ZZ~ '~'~-~.~ ~ ":L:~: :~'~' ;~ ...... '"ZZ '":.'Z'::~ ~ ....... ~L~J" t ...... ;.~;r .,~,'; F~, ,:, '[:' ~; HH zI'H' 'HrH['MF' ~'r' -H';. IHt '~'H': "t':'H:,~:~r'"':~"T~;~:'tr ~ .......... ~: ~ .................... ~ .... t ..... ~ ~:~' ~'~'" * .... , ..... , ~-,.,--.-~-~ .... ,t ......... X.-, ;f.4 ........... ~ .... . ....... ~ ~'. ......... ~',",' ~ ...... "~'"~ ........... ~ ...... ~",-:-:r.;': ....... ,-': , ........ , ..... ,.,, ..... .? ..... ,.-~.,? ...... ,, ....... :":'~::=~=::?~'t =: : :':::"': ~ ........ ~'";'""';~" " ...... ?x~~ ..:~ _.. t~E~ ~ . :.~:~ :: .:.: ..... ~ ~: ~-,::::. ::: ;.:; , ;: :=., ::: .;:;~::: ::::::::::::::::::::::::: .~ ~:. .............. ?.4 ....... ~ ............ ~ ...... = ...... ~ ....... ~.~... L.:..~...~...,~:.~:~-~:L.~.~::~.~:?~,:~:~,~.=~~:~-~:.~ ........ ~=~.~. ~.-~-~ ~ ~-~.~:~-E~,-=~.,..~.~:'~,.~.~...,.~,,~ .... - .......... ~ ......... -~E~._E :Z'.::~ LEi~: ~.:Z: ~E:: ~hZS'. ~:Z '7~t: L~' "L~'. ...... ~ .~..? .... ~...-~-~ ~.,-~ .... ~ .~.,~.. +.~4..~ ' .~..~.~L~ 44.., .'..~.~.~ ~...~.~ '..~.~L $.~.~ ..... ~, .+.~.~ ~.~.: ~.~'. ~ ..L .L..~.~ ~.~.-L~....~.'...' ~,.~.'~ .~':" ~.,. ~.L~L, ~..~L~.;~ ..~. ',.~ ~a~ ~..~ ,'~ ' ";'::. ~'"~:: :':-..::';.. ', ::-; ~:F ~' ~ ~:J '~:~ .'.d.;:~+ ~-~'~ ','~ .... . ,. ~.:..~ ...... ~.; .--~.~:.. ':" 4,.~.. ~.-~:..+-. ~ -:~ ~.k~..-~ ~_..~:, :.~ ...... ~.-'-_-~..~a~ +' ~:..~.;~.-~..;4 ...... ~ ....... L, ..... 4... :,~.., ............ ' ..... ' -.:-~-:.....4 .. ~ ,. :~2~ .: ~,-,. ,~ · t+~ t, ,, , tE ~ ~ ~ ~ 'E~'tit't ...... ~',~rt'~, ........ -'~. ~. '~'~'" ~ "~'~ ir' ~,'~ ~-t-- ' ~-~ ','rr'~'"~+~ .--~ +~.~ ..... t ...... [ ..... ~.-~-~ ..... +- -~t ~t · ,- ~ · , , ~ tr · ~ ~ ~ .... ~ ...... ~ ~ ' ~ ~ ' ............ ~ ~ .... ''i " ' ............ ~' ' ..: .... :.:. ,'?:,'. ~-.::~L~:','~. ::~ .... .:...:.:...~-.:~,.::.~...~-:e :.. '4'" '~ .... :.".,~ . .'.."t?'~. ~:'~ ~ '~ ', ~' ~' ~ ....... ~ '+' '"~'",' ~' '~ .......... ~" ', '- ~"'-',',~.',-, ~.+~ t ......... ~ ~.,?~ ..... ~-~.-..-~ ...... ~--~ ......... ~ '..~.., ~';:- :'"'"~ ~ .......... '"'~ ..... ~' '~' '~'~'"~'~'~'~ .... ~ '~""~:;~:"'~+: ' ~'~'' '~'~ ~"~-~ +' "~'~ '~' -:'~ ~ ~'~ '~'L' '~"~ ' '- '-'~-~ ~'+~ ..... ~'~'~-~--'~-~'~' '~" . ~.r.~ .~.~., .. ~..~ ...... ~''~4: ":: ~: ' ::4 ~ ~ ~ ' ....... ' ' "" - .... '" '. ..... ~ ~ ..... ' %~" .... ~"~ · ~" ~'~ ' ""-~, ~.~. ,.+,-- ,t-~ -.~-~. ,-+ '-~. -i ...... ' .-. ~ ~-r .... ~.- ~'t~ &t - - .... ~ ~ ~ ..~:'.:4: ~:::::.~:~ :.-::: ~:..~-L;~: ..::'.: :~.~'~.::-~::.~ ~4. :~'~.L .[ ~ L L~ ~L~ ~E ~: ~E~L :~'~ :.~'L.~:~.~L~ .~:"~ ~:.'~'~ '" "j ~:~ ~ ~ L~'~': :':L~"~'LLE', '?' ~'~'t'~' '~'~t" ~ L~'~ ~ ~' ~ ~'~ :~ .~...::: ~:::: : ~, ::: :~.~ ~'~ ~L~, L~ J ~':;:Z: :: L~"TFT 'Z~~ ~ '~'~:E~ '~ ....... : .... r '~t'"~ ""~ r '+-,~ --~ee~- - ~ ~ ;~.~. -.-~, -~.~- :.~ ......... ~..~ .k;:- .~- T.~ ......... ~u: ...... +~-.~.~? ~-~4;.-~. ~? .~,4.. _.; .... ~ '~j.~-. -'..-~- .' ..... '-~k~ ..... ~.-~-:-~... ................ , ..... ~-: ~..~,;. ~:'~' ~ .... ~ - , ~ -- ~ ~- .~- ~ ~t-~ ~ ~ ,.~.-~.~,..?~+ .~,~...~--T "~ .......... X'~' ';~' ~' ?~ .... ~ ~ ' ~' ~ "'-'~ "-- ---~ ~'" ......................... ................. .......................... ~ ~ ..... ~ ~.~.. .... ~.~ ......... ~ ..... ............ ~ ~ ~ ........ ,~ ..... [.~ ..................... .................... ~.~ ~ ! ~ ' ~ -~ '~+ ....... ...... ~ ..... g ~''-~ ' "'~ ~ ....... i.. 11%.]~ ............. 1711 LTif. 7: ..... ,i~i'-" [i~%1 71%!: ~ "': ........ ~-~-' ....... ~,g.~ ,~ ,.~' .~ ...... ~ ~ ....... ~ ~' i ..................... iEi~J]~Z.~' : ' ' ~ .................. ~' ' ~' ' ~'~ .......... i. Lf L ' ' , ,. ............. ~ .. ~ ~ .... ~ ...... . ........................ ~ ............. : .............. :: ............................. ,~. ........................ ~ .... ~.,., ........ ~ ............................... ~ ................. ~ . , ....... ........... .......... ..... _ ......... , ................. .... .... : ...... ' .......... -~~_"~-: ........ ='~"~-~d-:'~-~'--~---:~ ,'::~: ..... :-?[~:~ ...... :--:~: ..... ~ ........ -~ .............. ~,-~-~ .... --~,.-t:-.:-+-:-.-, ...... :.+ ......... T-:'",: ..... ~ .... ~--:~: .... ............ ~~.~ ........ ~ ........ ~ ~ .... .~ ........ . ...... = .... . .................................... ~ ...... , ..... ~ ................. ~ ..... , ........................... ~ ............. ' · · .~., .... ~ ................ ~ ..... ~ ~-7'~'. ~: ............ ~ .... [ ......... -- ..... ~ ..... ~ .............................. ~. ................... ~ ...... ~ ...... ~ ...................... · : :: ::::~::.~: :::.~.: :~::: :-~ :: ..... ~:,;...~: ~:~-~ ~,:-:.;...::.:..::: ::.-: .:;-. :,.-:.~ .::~f~.~ -L~:L:..~. -;~ '~:'.... ~,.~:.~...-'~-.~-L .... ','.--, ' .... '.-.: ...... ~ ~.-~:-~., ~.:- .:~.~ ........ l ......... ' ........ ~-~-~ ..... ~ ........ ,~'F~.'.[ ............... .~ ....... ~ ................. ~ ......... ~ ........ ~ .... ~ ............... ~ ........ I~ ........ t ......... F...: .... t ......... ~ ........ ~. ........ ~ ............. ~ ..... ~ ........ ~ ........ T.~:~.,~ .... +- . : .... :.,: .:..: ~..: ..:.~.::. ::..i;;.. ~::: ~:,:;.::..~.::; :;~: ~'.:; ;.;- ;;:; ;;',,',:.. ,::;' ..... '.:;; '. ...... ;. ;,;.~...~.~;,~ ;..: ..:...: ...... ::..',;.:. :,;.' .... :...~ .. ~.:. :~'. ..... , .... ~ ........ ~..-, .... , ............... ~ ........ ~ ..................................... ~ .......... ~ ......... ~ .................... , ........ ~ ............ t .......... ~ .... ~ .... ~ .................. : .... ~ ........ ~ .... ,..;.~ ..... · :::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::: :::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::: ::.::::::.:: :::::::::::::::::::::::::::::::::::::: ~ ..... t -:;' ~': ;~ :--:~;- ~~~ :~: ..... :-~--;~ :-~;-. :-~.;+.-- ;~..: ~.; ~ ........ ~-~-~ -. ~- ~ --1--- - - ~'. ........ :.L~:.: ..... ~ ....... ~ ~ -.--. ~ :-~ -~..~.:~ ........ ;.:::; 4: -. L. -: -4.-:- -.: ......... ~ .... I .... '.: -. ~::.; ~.. -~I :; :.,L_,. :::::::::::::::::::::::: ~: ::~ :::F:: ~:~:~:::: F:::: ::::'~::' :~: :~: ::~:~:: :~--'~- '~'~t':~: :~-~"f-~ .... ~ .......... ~ .... ~-~ ........ T ..... ~ ...... ~ ..... ~ .... t .... ~ .... ~: .... .... :~ ....... ~ ......... ~ ........ iL .:. :...~ ..... ~,,, -- ~",,.i .... .............. '~.'.: ..... ' .... ~;..~ .......... ~ ...... : ........L' ;.L : ........ :-..: ........... ~ ................. ~ ..... ' .... ~ ........ ~ ..... L:~ .... ; ~"::~ ..... {:": :::: .......... ' ........ ' ....... "' ........~F' ........ ~.-,4 '.~'.; ;.~,; .'~. ~..: ,', ,,,, :.:. +..~ .;.: ,~.~..~ .....................~. '..%~. '.~ ....... '. .... : .... ~..: ...... : .......~: : ....... :,.',~ .......... ~ ...... :...L .... ~ ..... ~ ......... ':.-'.-- 1::'-.~,-; ARCO Alaska, Inc. Post Office Box. 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 17, 1982 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT; DS 6-23, Permit to Drill Dear Mr. Chatterton: Enclosed is a corrected version of the permit to drill for DS 6-23. The corrections were made to the coordinates for TD due to a slight miscalculation of total depth on the part of the service company personnel. Also included is a revised copy of the directional planning map. Sincerely, M. A. Major Area Drilling Engineer MAM/RFB: 11 m Enclosures BIE1/M5 ARCO Alaska. Inc. is a subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO,.,MISSION PERMIT TO DRILL 2O AAC 25.O05 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL ~( DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC I-] SINGLE ZONE~ MULTIPLE ZONE [] 2. Name of operator ARGO Alaska, Inc. 3. Address P. O. Box 360, Anchorage, AK 4. Location of well at surface 99510 9. Unit or lease name / , A~rndhoe Bay llnit. j~. Well number " 702' NSL & 1010' WEL, Sec. 2, T10N, R14~!ast~0il & Gas Cons. At top of proposed producing interval 2631' NSL & 26' WEL, Sec. 2, T10N, R.14~, UM / 6-23 At total depth / 11. Field and pool 2899' NSL & 111' EWL, Sec. 1. T10N, R14.E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF etc.) [ 6. Lease desigC~,.~ion and serial no. / Prudhoe Bay 0il Pool 74' RI(B, 37" PAD | ADL 28311"\ 12. Bond information (see 20 AAC 25.025) Federal'\Insurance JZompany Type Statewide Surety and/or number #808-8-26-27~ Amount $500 13. Distance and direction from nearest town 14. Distance to neare~property/r lease line 15. Distance to ne'arest drilling or completed 3 NW Deadhorse miles 2381' from ADL 2830~ feet ;-22 we~l 120' _a surf_ace feet 16. Proposed depth (MD & TVD) 17. Number of acres in I~ase/\ 18. Approximate spud date 9803'MD, 9211'TVD feet 2560y 10/07/82 19 If deviated (see 20 AAC 25 050) 20. A/n~icipated pressures ~A A 8 psig@ Surface KICK OFF POINT 4000 feet. MAXIMUM HOLE ANGLE 28 I(se 20AAC25.035 (c) (2) ~psig@_~_l__ft. TD (TVD) Proposed Casing, Liner and Cementing Program SIZE [ CASING AND LINER [ // SE~-TING DEPTH I QUANTITY OF CEMENT Hole Casing ! Weight I Grade /Coupling Length I~ ~O. I (include stagedata) 130" 20" 191.5# H-40 Welded. 80' t/ 37' I 3~' 117' 117' 11990 # Poleset ~7-1/2113-3/8172# I L-80 ~UIT 12464'/| 36' 36~' 2500"I 2500' [2300sxFondu+400sxPF !2-1/4 9-5/8147# L-80 BLflT 179987_! 35' : 35~ 8033'1 7649'[ 500sx"G"lstStage I ,, I I S00-95~LfFF I~00¢' ~ 8033' I 7649'~9033'I 8531' I 300sxPF.I2ndState !8-1/21 7 129# IL-80 ~LET 1107'O' ~ 8733' ~, 8266' \9803', 9211'I 400sxClass"G"Cmt 22. Describe proposed program: / ARGO Alaska, Inc., proposes to dirqctional!y drill this ~ell to 9803'MD (9211'TVD) to pro- duce the Sadlerochit zone. Logs wi/ll be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack will be installe~/and tested. The annulark, preventer will be tested to 3000 psi and rams tested to 5000/~si. The BOP equipment w~',tl be pressure tested each week and operationally tested e6eh trip. A string of 5-1/2", 17# L-80 tubing, packer, and gas lift mandrels will be ,r~n. Provisions for subsurface safety equipment will be run A non-freezing fluid will be le/ft in all uncemented annuli within the permafrost interval. The packer will be set above t~e Sadlerochit. A Sundry Notice will be submitted when the well is to be perforated. A s~rface diverter will be installed and operationally' tested prior to spud and at least daily thereafter. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNED ~~ TITLE Area Drilling Engineer The space below for Commission use DATE ~./~/~.~ CONDITIONS OF APPROVAL Samples required I Mud Icg required E~YES ~'NO I []YES ,J~NO Permit number I Approval date $2-/$..q I o8/z8/82 Directional Survey required ~YES r-INO APl number 50- dz ¢ SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY ,COMMISSIONER DATE ^ULmst 11~, 19~2 by order of the Commission Form 10-401 Submit in triplicate STATE OF ALASKA ALASKA C .AND GAS CONSERVATION CC ivllSSlON PERMIT TO gRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT el L ~X DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE~ MULTIPLE ZONE [] 2. Name of operator - ARGO Alaska, Inc. 3. Address 'P. O. Box 360, Anchorage, AK 99510 ~" 4. Location of well at surface 702' NSL & 1010' WEL, Sec. 2, T10N, R14E~ UM ~'~/~." At tOp of proposed producing interval , ~'~](aUll 2631' NSL & 26' ~L, Sec. Z, T10N, RI4[~, ~ "~6~sc~ ' ' At total depth , i , u~ 2899' NSL a 111'-~, Sec. 1, T10N, ~4E~, 5. Elevation in feet (indicate KB, DF etc.) [ 6. Lease designati~fi and serial no. 1 74~ ~, 37" P~ ~L 28311 9. Unit or lease name Prndhoe Rav Il'mi t 10. Well number ' 6-23 11. Field and pool ?rudhoe :Bay Field ?rudhoe Bay Oil 7ool 12. Bond information (see 20 AAC 25.025) Federal I~L~ urance Company Type Statewide Surety and/or number #8088x26-27 Amount $500 ~000 13. Distance and direction from nearest town 14. Distance to nearest pkoperty or lease line 15. Distance to nearest drilling or completed \ 3 NW Deadhorse miles 2381 ' from ADL 2~,309 feet j-22 we. 1 20 ' @ st:trace feet 16. Proposed depth (MD & TVD) 17. Number of acres in leasek -' 18. Approximate spud date 9803'MD 9211'TVD feet 2560 ~ 10/07/82 19. I, deviated (see 20 AAC 25.050) I psig@~ 20. Anticip',..~ed pressures 3~, ~. ~_, Surface , KICK OFF POINT 4000 feet. MAXIMUM HOLE ANGLE 28 ol(see20AA/c~.035 (c) (2) ~Cl~psig@~ft. TD (TVD) , . 21 / \ Proposed Casing, Liner and Ce,~entinkg Program j S~ZE I CASING AND LINER ] / SETTIN~:~ DEPTH QUANTITY OF CEMENT H i ' / ! ole I Casing I Weight [ Grade / Coupling l Length I M,D~. TOP TVD ] ~D BOTTOM TVD (include stage data) z0" 19 .s# m40 , 7-1/3113-3./8172# L-80 Burr 12464' I 7~61/: 36'1 25~0'; 2500' 2300sxFondu+400sxPF ~2-1/4 9-S/8[47# l L-80 IBlSrr 17998'. I 35/~ , 35'1 80~'~ 7649' S00sx"G"lstStage [ [S00-95BUTr. 11000' I 803.8' I 7649'1 903~' I 8531' 300sxPF.I2ndState 18-1/2! 7" [29/¢ IL-80 ~BUIT 11070' ] 87~3'I 8266'1 9803~} 9211' 400sxClass"G"Qnt 22. Describe proposed program: . / ARCO Alaska, Inc., proposes to directional!Y drill this well ~o 9803'MD (9211'TVD) to pro- duce the Sadlerochit zone. Logs will be rub across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack will be. installed and re-s/ed. The annular preventer will be tested to 3000 psi and rams tested to S000 psi° T~e BOP equipment will b~_pressure tested each week and operationally tested each trip./' A string of 5-1/2", 17#,, L-80 tubing, packer, and gas lift mandrels'will be run. Provisions for subsurface safe'fy equipment will be nm. A non-freezing'fluid will be left_ in all uncemented annuli within the permafrost interval° The packer will be set above the Sadlerochit. A Sundry Notice will be submitted when the we.ll is to be perforated. A surface diverter will be installed and operationally' tested prior to spud and at least daily thereafter. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNED TITLE Area Drilling Engineer The space below for Commission use DATE ~./~'2/e.~ CONDITIONS OF APPROVAL Samples required Mud log required Directional Survey required APl number []YES ~NO •YES l~glO ~YES [~NO 50-- 029-20808 Permit number Approval date 82---133 08/18/82 SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY 1982 ,COMMISSl ONER DATE by order of the Commission Form 10~401 Submit in triplicate : :, i i i i i ~ i i } i i ! i ~ i ' ; ~ ; j ! iIN ~' ill J il, i ~ : I i i i i I t ! ~ i I ' I i i I i ,~,,.,I,.,I i ,,,i I t I .|i J T ,,.,i.,,,~l ! o~,1.,.~! I ' .,J.,~,i ! I I ! """'"'~ * ' ' ' J.~UI I i I "'UUI I i. ~UU I i ) ~ ~ ~ , ~ J I ! I I I~ ! i I ~ i I 'i i I ! ! I [ I I ! i I i 1_:-~,...~1 i i I ! * i I i ! I i I I ~ ! i~,"~..Lgl i I i i i i I I I I I i i. I I i ~/~i i I I I i lr~l i I i i i ! J i ! i J ! ! ! i i ~ I ;. I 3 ,'~1~1 I i i I I i I ! ! I I I [ ! I !. /1 I I 1 i I i I1 i I · , I!1 I ~ ! I I I I ! ! I ! ! i I ,--I i iI::,l:l'~'Plkir/ ]1. Tl~ltlmlll ,,i~,.f,~ /I, ] , i_ ,,i, ,,,,--,-,,, .,,, I, ,,i, ,,i, ,,--, ....... '-?',,'.-,',' -, ,', ,'.' ,'"' ' i ! ! I i I I I i I i I I I I i I i 'i i i I ~ ~ ' ! I I i I ,~" ! I I !~ ~ ! I 1 ~ ~ ., 'i i i I i~ I i I i i i i ! ! ! I I { i I ! .~ .... /i 1 ~ I . , I i I i i ['1 ~1 I I i , i I ! I i-i I i i I i i I I i ! I I i I ! / i I ! , . 1 , , ~ ' ' ;' ' ilii I I !I i :/ ~ ill ! II ii! ' 'I ; ,i ,il, "~'*-"'"'"" Ii ~'i !i i , ~ ,,,,, ,,~ ~ , ,, ~i il!i !lli illt ~1i! ~-i!I . ~ ' i~ I ,~,r ~ili Ill ! II Iii ~. - ' ;I~i ilii Iii ;111 II1i Jill ii I il !ii: i'i' ~'" '" '"' :'" '"' '"' i/'-';"~l' ~ '"" "" ' ,i i i i !I1~ 11 fill lill '1 1 Ii I · ~ i I i., I',, i,,~ il~ ~' ' ~ ' ' _!_i I I I i ~ I i I i I I I I i [ I ' ' ~ 1 , r ' ' I I I I I [ i , . .['[! . i Iii II i,""~"'! i ili! I1 I ~ il i I I ~i ii I'~-'-' ' ' ,,,, -,-~,i il, ii,i -~'..,_~-~ .r i r. i , i i J I I J i i ii il I ,llr ~J Iii Ill/,am~. / , I I I i l , , · J I , , . , i . 1 , i , il i Il i! 1! i ! !I I1~ I i-Ill Il JlJ II,/' Itl .," ~ Ji I I j I J J i i I i J ' I J '. i J i i I I J'[ I J j ! i I i I J ! l/l i I ! I I ! ' J j J i i I i I , i I ~ I ! I I I II i I i.l. i ! ~ ~ I I I,',lJ I I II , , I J ! i I i i i '"l i ! il'! J it" .Jill llll ',I I i,l,, ill I.,F' .A-L- /Lq~'. ti'l , I I. ii'.. il! Il ill ll!J Jill ~ I Jill Jilt iii '( I j d J Jt I i I ! J ' i~J'j ''Il jlJJ lllj TiIIJ itl! l'' ,/ I I ./ I I I ! [ I . J i j 'J ['-~] , , J I j ' I I I i ~l I J .i J J i [ ~i [ I ! I ! j I I. Iii j~ i--i~ i-'= , i i il': i .Il iiii i I"i~.J,~-4,i I , I ' i I I i i i i I %,;,~,~,i J I I ·L I 1 ~ ' I l' ' J ""r'~ I /: I . . i :L , , · : · ~ '- · · · ~ L- , . ; . ;:.l .- :., .:l I, ~, .' - ! .: ' _ ,:. - : · ._,il , , , r-' I; .1. ',t:N ~ (:; :t;'.-:-..'i":~; ~:'.i],/_: :-i:fi;::.-i-'.-:i;. .:/- · ~ . i r / I"' I"1;ii [- ~1' ],~.:. i.;:-,!!',':~';'!'-i' ~- ] :' :' ::: l~iri~ I'1 ' ' ' ~-1 J ] i i('1 ~ I J'- I i i i-'-i , i'~,~ ~: ' ,' f'l .% I I ~ J' .... ! I I J..,,/ J ~ i i ,".,!~ i, ! i I ! I i i i ~,.I I ! I!! t I .~ I ~ I ~' I.,,,,'" ..... I I , I i I ~i. J I I i~1,.I l JJl ii II i,ll ; I i I il 1 I ~ l! ! i , i i i I ~ I i 'N,.._ ! I I I ! i l! i ~'1 , I , i i i . j,~i ;,,,t"f I 1 i I I , . . i==- Tt'i I ! J ! i i I ' ~"!'I I I ~ , i.il !l , , ] '4.,.J i i i ! '""~1 , . ' L.. ' it ~ --ill lJJlnnlj_iiii llj ! ilii: , I'ii1 i l! i '-'~, I I I J,ll : jill ii. i i i' l"'"'im., i i i i i I I ' "J'~i i i i I i i i i i ~ I ~,,,~'''- I i I i i i ~ ' i ! i i i i i i ,. ,... ,.,, ,.,....,,. ,,,, ,,,,.., ,,, ,,,. ,,,, !i ,ii ,,,,i. 'iii .11~I, i11~, -i-1¢~: ~iii il i i --ii i I i i1 _ J ~ 11 I i1 1 i ~ i ! i i i . i i I ! i i I i i i ~ ii i I i i I ! !~ ! i I ~ i i I i , i i I I ! , iJ j ~.. ~ ~ i, .j ii !!1~ !! ii iJll ilii i ~1 I11! ~ i1~.1 iJil ,~ !~ignnl~ ~ili ill i J.tj J J i i' i ! I i ] J J i , ! J J J I [ J i J , ! ! I . I i ! , il , il."~ i i ,' ,'l ,~:z , , ~ i .... I iii' 1 1! i Ii Jill ii1' ~, ,' , ~ j i i .'I ! i E i ! i j ~ ! i j i I J I ! i ! J,l.,,i i J i i I ! , i i I i J i ! I 1 J I J I i I I J I i i ! i ' i !111 ilii !iii iil~ , . .. ~ . , '. ,.i ~ii! Iit~I iili il i i I] i II i il illi iil I ' i ii ii ii! t ' J ' "" "' i I j I ~i ilii i,i~ ilii iiii II11 ii , i i~ ~ I ~ Jl Iii~ ill · , I~ ill IIII *1t' !ili il I I1~1 i i.I i I I 111~ ili ! I 11 i t il j -i~ il '.ili ~ ii " ~ ii',' ~ ~i :,i, ,, , , ~~ ,'J, !'.,,~,. , '.'-.,, ,¢ . j_ 'i ., , .... ,i ........... ~ J,ii i~ . II1! i;;J:;i~-:r' ii;;11 i;:l~i;i,~l;;j 11' i"J! iii I i I 1' I --:',,~ ,1,,' ,-,I..! i Ii ~ i,~j. .,',,. ,,,, ,,,,, l"r'?'~ ,~. '', ~' .--',' . ,--,"-- .,'1-i''''-~,''''''' ,, ~'~-' ' '.. ' ~'-- .s',', ,". , i i l~ll i ilii i,, i!Ii i lJi , III , [i '~'~,'/~59 '),~ I " % ~1 ' I i ~ L,i i i ; i i J ~r"~ ,,~,,a,~a'~l i~,'~ ~ I i j I , ( ' ! I ,~-,~sr.,~n_. .. i J I i . , ~ il i iili I!]i .i , , ~- · ..... i~ll iii F''~"''' ii- i i il ! iii i i~i il ii ii I l'l~ ' ilI ii ~ i I !I [ i "ff.'''~ I /'~'~;P./i:.J i , i I ~ ,i . ~ i .... i i!Il i ''il I!1~ i!1i ilii ii!i II!i ii I i , illl Il I i i i i'i , i I T':I · il iiii i!li IIII [-1iil ilil ii I I i iiii ~ 'i i I I i i I I i!1i ~i~ .l ilii. till Iili illi il~l i ! Ilil I t I l, I 1 , I iii! I i i i I 'i i i i i ~ I ~ i ~ ! i i ! I i i i i I ~ '! I I i I I I I I I i I i t i i i i i ~ i i i I I i i ill iiil i ii i ii iiii 'Iii iill i111 i I llli I ,i ! 11 I 1.1 il. I ! I !Iii , , , ' , , ~ i i ] I i i i ! i.i i i ,, ' 1 [1~ I .... i I i I I I Ii, I 1 1. , ,I 1 !, 1 I, , ,I ! Il, i J i l, · 13-5/8" BOP STACK DIAGRAM , , - ! i ANNULAR PREVENTER BLIND RAMS Accumulator Caoacit¥ Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultane- ously and record the time and pressure remaining after all units are closed with charging p~np off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. PIPE RAMS DRILLING SPOOL PIPE RAMS 13-5/8" BOP Stack Test 1. Fill BOP stack and manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark running joint with predeter- mined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and chokes and bypass valves on manifold. 4'. In each of the following tests, first hold a, 250 psi low pressure test for a minimum of 3, minutes, then test at the high pressure. S. Increase presure to 3000 psi and hold for a minimum o( 3 minutes. Bleed pr-essure to zero. _ 6. Open annular preventer and close top set of pipe rams. Increase pressure to 5000 psi and hold for at least 3 minutes. Bleed pres- sure to zero. 7. Close valves directly upstream of chokes and open chokes. Increase pressure to 5000 psi & hold for at least 3 minutes. Bleed pressure to zero. 8. Open top set of pipe rams then close bottom set of pipe rams° Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 3 minutes. g. Test remaining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. 10. Bleed pressure to zero. Open bottom set of pipe rams o 11. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minutes. 12. Bleed pressure off all equipment. Open blind rams° Make sure manifold and lines are full of non-freezing liquid and' all valves are set in drilling position. 13o Test standpipe valves to 5000 psi. 14. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 15. Check operation of Degasser. 16. Record test information on blowout preventer test form. Sign and send to Drilling Super- visor. ~.~,, 17. Perform complete BOPE test once a week and functionally operate BOPE daily. Rev. 5/13/81 SURFACE HOLE D IVERTER ARCO ALASKA SYSTEM INC. SCHEMATZC I0'° HYD.' OPR, BALL VALVE' WELL BORE ISEE DETAIL! I0" HYD. OPR. BALL VALVE I ALL 90" TURNS ARE "TEE" CUSHION WELL GBORE - RESERVE PIT AREA NOTE' FLOWL INE DR ILL ING RISER I0" DIVERTER LIN Valves on diverter lines open automati- cally when the annular oreventer is closed. 20" CONDUCTOR PIPE "DETA IL" 2026010 ARCO Alaska, Inc.~'~- Post Office x 360 Anchorage, Aiaska 99510 Telephone 907 277 5637 August 9, 1982 Ms. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Conductor'As-Built Location Plats Dear Elaine: Enclosed are as-built location plats for the following wells' tee~8 Drill Si Wells 17, 21 22, 24 Drill Sit Wells 6, 7, If you have any questions, please call me at 263-4944. Sincerely, JoAnn Gruber Associate Engineer JG:sm Enclosures GRU1/L62 ARCO Alaska. Inc. is a subsidiary o! AtlanticRichlieldCompany ..... = ..:,~:~,,::, F~.2= ~ LF~T= ,--"F~ 14 3S. !C-:9 <2 ! II !:2 6 ..... 22 V=5., 94 i, i L::2. --_';6 % = 6 E: 5., '~ '2 ,'". 66 LRT= 7-0 i 4 ~9..%143_=, LOHG=I%::: .£9 fsi .27S 6."23 Y=5,94'~ , 2'39. M= 685., 969.'. LRT= 70 i4 40.49S LOf'4G =14:5:':/9 -%i . 6.424 i'== ;:-;; = 6 8 5., 94.. 2 LRT= ,-":"0 ! · L 0 ;'-.i F; = i 4 :E: 2 '.-.-'. · -' r ~ :'1 ;./,,, ,., ,.- _ -- --, = ; HE.<EE;", L-~-'-''T!~'/ '.;:.'F'OP'E:-'h'r' ~'.~,.. I ,:..;Tk-F. ED c TF:Ef-i'E;ED TO F'.F'tR'---'TiI::E :3UF, b,'.='-/~ :..,.~'..% T. r-4 THE STflTE 6LR:E,i:.:3 Pi".iD TFIRT THi:---; F'L'.Fi, T' F:EF'RE:E, Ei'~T'E: Fii',l FI:-:;-E',Li I LT ':.': U F.: L,' E "{ H F'i D E U I'-i E, E F: t'1";' D I F.: E -' T :EzLiF'EF.:',.,' [ :-3 [ F~i",~, FI!"IO TN.P,T OiHE,ki:'~;]:Fjh!'t--_ ~t'..i,'-i F, THEF: DE'FrilL ;e~:E ,:: ,:, ~: .:.:.: S ,:: T .. aS ,:,F: 7/Z7/~Z 'V g: ::", COOF:O'.:-, RRE RLFt:31- '-:,'rR':E F'Liq. r.-iE ZOHE 4 oLL -'.-_~:L;TF4,r''',C.E::' ,~F.'.E t:;UF.'.F~:.£ - - '"' 1-11-I i F. : · ' ..... t'~ ~-',, F': C: £ L · ;ri:.2 E:F,:::'. '-cLc~' ~= 57,12. · 65:_-:, 2. 52 7£-" '11'' '------- 'l-- -- -;--I ~~ '-I E t. !i)ji co:A' aS] al-'-inC. ~ L NORTH SLOP~ DRILLING-PRV,'DHO£ BAY H 1-,.! C: 0 F:.: C E L L ~ F: P,O:"': ,ct E' '= $"/.0~ i.-i:j, ~' SHEET 1 OF ! CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE Company Lease& Well No. YES NO REMARKS (1) Fee (2) Loc (2 thru 8) 1. Is the permit fee attached .......................................... ~ 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ................................. 8. Can permit be approved before ten-day wait .......................... (3) Admin.z ..5~ ~'/~' 9. (9 thru 11) 10. 11. (12 thru 20) 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. .23. 24. 25. (21 thru 24) (6) Add: Does operator have a bond in force .................................. ~ .. Is a conservation order needed ...................................... /~ Is administrative approval needed ................................... ~/~ Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ...~f~__ Will cement cover all known productive horizons ............... '' '' Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ............ Are necessary diagrams of dive~ ~n~ ;;; ~qul;~ ~~'~ 1...1]. Does BOPE have sufficient pressure rating -Test to ,5'~t~ psig .. Does the choke manifold comply .w/AP1 RP-53' (Feb.78) .................. Additional requirements ~///z ....~............................~.......... c Hc Additional Remarks: Geology: HWK WVA Engin~ing: LCS~/_~_ ~'BEW J K~RAD rev: 01/13/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX~ No special'effort has been made to chronologically organize this category of information. PROGRAM: LISCAN REVISION: 5.2 Start of execution: Thu 20 DEC 90 2:56p **** REEL HEADER **** LIS 90/12/20 AWS 01 PART NUMBER: W5790-MICRO **** TAPE HEADER **** LIS 90/12/20 01 FILE # 1 LIS .001 **** FILE HEADER **** 1024 CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 6-23 : PRUDHOE BAY : N. SLOPE : ALASKA * COMMENT RECORD * RECEIVED JAN 9 199i Alaska Oil & Gas Cons. OommJssion Anchorage API NO. 50-029-20808. PDK-100 RUN ON 26/NOV/1990. FILE 1 : WELL SHUT IN. TYPE OF FLUID IN BOREHOLE: WATER. FILE 2 : WELL SHUT IN. TYPE OF FLUID IN BOREHOLE: WATER. FILE 3 : WELL SHUT IN. TYPE OF FLUID IN BOREHOLE: WATER. PUMPED 160 BBLS OF BORAX FOLLOWED WITH 240 BBLS OF CRUDE. FILE 4 : FIRST PASS AFTER BORAX PUMP IN. FILE 5 : SECOND PASS AFTER BORAX PUMP IN. NOTE : CURVE PDKP IN FILES 1 - 5 IS PDK POROSITY, AND SGNT IS DIFFUSION : CORRECTED SIGMA. FILE 6 : AVERAGED SIGMA (DIFFUSION CORRECTED) AND POROSITY : SGAV IS AVERAGE SIGMA. PAVG IS AVERAGE POROSITY. * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME ~TAPE DEPTH UNIT : F 6 CURVES : NAME CODE SAMPLE# UNIT 1 BIF 68 1 DIM 2 BKL 68 1 CPS 3 BKS 68 1 CPS 4 CCL 68 1 DIM 5 CSLL 68 1 DIM 6 CSLS 68 1 DIM 7 CSLT 68 1 DIM 8 CSS 68 1 API 9 G1 68 1 CPS 10 G2 68 1 CPS 11 GElS 68 1 CPS 12 GR 68 1 API 13 ISS 68 1 CPS 14 LS 68 1 CPS 15 MON 68 1 CPS 16 MSD 68 1 SU 17 PDKP 68 1 18 RATO 68 1 DIM 19 RBOR 68 1 DIM 20 RICS 68 1 DIM 21 RIN 68 1 DIM 22 SGMA 68 1 SU 23 SGMB 68 1 DIM 24 SGNT 68 1 SU 25 SPD 68 1 F/MN 26 SS 68 1 CPS BYTES 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH CSLL G2 MON RICS SPD 9760.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9710.000 22.58414 884.6721 2018.176 15.11618 22.99770 9660.000 18.06537 2284.183 2027.007 13.78489 12.88950 9610.000 15.18539 (TYPE# BIF CSLS GElS MSD RIN SS -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 1.967586 23.68748 107199.9 0.7749897 12.57473 27121.30 3.343818 19.30438 114975.1 0.2401397 10.17737 33867.87 3.295451 16.10863 o) 978 BYTES * BKL CSLT GR PDKP SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 160.4020 28.15139 20.07852 43.80636 28.71068 52.58299 20.99194 20.54126 26.12490 21.81944 71.96802 17.56236 BKS CSS ISS RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 700.1392 17732.30 308620.4 21.61952 78.81013 184.9990 21932.84 297910.7 18.67731 70.85754 193.0850 22222.58 CCL G1 LS RBOR SGNT -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 5280.070 1251.659 1.548562 24.07729 142.6500 9031.066 1818.221 1.507635 17.69581 0.0000000E+00 9080.254~ '2278.944 118781.1 26.33504 307779.2 1814.021 2027~125 0.3676480 25.87226 19.01196 1.547187 13.55410 10.21777 21.27608 67.23759 17.24734 12.99870 34505.92 9560.000 4.172235 60.63600 171.9230 0.0000000E+00 12.19294 12.97306 14.31152 25453.03 14238.95 5680.430 111833.1 15.04951 295206.2 2689.243 2028.041 0.2049776 16.88343 14.14627 1.530832 12.37661 9.461676 14.06889 67.06046 11.84887 12.99870 37971.09 9510.000 4.117217 40.12001 163.3150 0~0000000E+00 13.20917 14.03615 15.29840 24487.11 12340.42 4204.648 115094.1 13.02139 296038.7 2349.767 2030.817 0.2458549 19.77740 15.91854 1.485109 12.14551 9.530518 16.42319 69.-67433 13.51855 12.99870 37413.79 9460.000 4.878114 50.77800 188.9010 0.0000000E+00 11.43268 12.14084 13.67310 25577.96 13510.77 4851.820 118529.6 11.23866 303693.2 2668.419 2031.318 0.1262437 15.61775 14.38932 1.512153 11.86003 9.500456 15.60682 69.93423 12.93162 12.99870 38318.41 9410.000 5.102923 72.29802 188.3120 0.0000000E+00 10.81096 11.87075 14.05004 26410.29 14109.89 5691.621 122846.2 12.90961 315026.6 3019.806 2003.973 0.1425009 12.08238 12.75653 1.555598 11.85532 9.640135 14.01886 69.23477 11.81409 12.99870 38504.83 9360.000 4.693410 40.96001 175.5230 0.0000000E+00 12.63679 13.11246 14.77522 26079.27 13759.74 5263.820 121794.2 10.67822 311440.4 2906.382 2003.073 0.1017352 13.375-46 13.23408 1.526484 11.69423 9.351244 14.76265 70.25389 12.33393 12.99870 38369.97 9310.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 101 9760.00 ENDING TAPE DEPTH = 9310.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 2 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 6-23 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 25 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 BIF 68 1 DIM 4 2 BKL 68 1 CPS 4 3 BKS 68 1 CPS 4 4 CCL 68 1 DIM 4 5 CSLL 68 1 DIM 4 6 CSLS 68 1 DIM 4 7 CSLT 68 1 DIM 4 8 CSS 68 1 API 4 9 G1 68 1 CPS 4 10 G2 68 1 CPS 4 11 GElS 68 1 CPS 4 12 GR 68 1 API 4 13 ISS 68 1 CPS 4 14 LS 68 1 CPS 4 15 MON 68 1 CPS 4 16 MSD 68 1 SU 4 17 PDKP 68 1 4 18 RATO 68 1 DIM 4 19 RBOR 68 1 DIM 4 20 RICS 68 1 DIM 4 21 RIN 68 1 DIM 4 22 SGMA 68 1 SU 4 23 SGMB 68 1 DIM 4 24 SPD 68 1 F/MN 4 25 SS 68 1 CPS 4 * DATA RECORD (TYPE# 0) 942 BYTES * DEPTH CSLL G2 MON RICS SS BIF CSLS GElS MSD RIN BKL CSLT GR PDKP SGMA BKS CSS ISS RATO SGMB CCL G1 LS RBOR SPD 9740.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9690.000 16.25945 2442.257 2012.605 15.61429 30673.45 6.888377 78.82600 222.6250 0.0000000E+00 17.21328 18.89783 21521.54 8775.980 123999.3 28.55734 333182.2 1673.644 0.2818193 30.05817 18.31688 1.702862 10.24864 19.81718 82.10315 13.99860 9640.000 14.71405 2798.267 2012.977 16.96977 33742.07 3.451094 149.3130 284.6489 0.0000000E+00 16.15342 17.07277 22446.61 9581.457 118625.6 38.38907 305008.7 1801.276 0.4776985 27.02432 18.66350 1.667352 10.73033 19.62688 68.47716 13.99860 9590.000 15.50630 4260.418 2015.408 12.22550 37606.55 3.727029 57.13600 176.5490 0.0000000E+00 16.04016 17.06555 24674.76 12635.08 115139.7 18.81155 297983.1 2292.043 0.1954424 23.41129 16.41281 1.490059 9.861801 16.68324 69.82138 13.99860 9540.000 18.19241 2912.890 2005.765 12.87312 35303.51 3.432496 48.56801 169.6830 0.0000000E+00 17.95623 19.25351 22895.72 10286.39 116137.5 16.43448 296541.9 1865.377 0.1243092 28.27081 18.93800 1.544110 10.22616 19.48465 72.09349 13.99860 9490.000 14.62673 4548.121 2006.524 11.89924 39087.05 4.113682 53.20901 201.3670 0.0000000E+00 15.23175 16.56621 25751.34 13304.85 119245.7 18.10187 306080.9 2590.061 0.2169680 17.31768 15.10256 1.483896 9.470987 16.45396 69.57262 13.99860 9440.000 11.41311 6178.176 2007.659 11.49913 40614.73 5.179255 49.63600 221.4400 0.0000000E+00 11.68247 13.40377 27793.48 15505.97 124589.1 13.73861 318921.3 3254.187 0.8263922E-01 13.31473 12.50659 1.503287 9.178881 14.07404 69.52016 13.99860 9390.000 10.42423 4997.133 2006.873 12.26290 39534.01 5.874521 85.06900 251.5670 0.0000000E+00 10.70102 12.66853 26935.42 13659.21 131071.1 29.65422 325276.9 3058.822 0.2286329 11.42148 12.91606 1.550365 9.698790 15.45309 69.04683 13.99860 9340.000 -999.2500 3.913342 -999.2500 0.0000000E+00 0.0000000E+00 0.0000000E+00 -999.2500 0.0000000E+00 0.0000000E+00 0.O000000E+O0 0.O000000E+00 11.64059 0.O000000E+O0 0.0000000E+00 -999.2500 -4.500000 5.000000 O.O000000E+O0 O.O000000E+O0 0.0000000E+00 300.0000 0.0000000E+00 -1.000000 71.69652 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 96 9740.00 ENDING TAPE DEPTH = 9310.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 3 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 6-23 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 25 CURVES : NAME 1 BIF 2 BKL 3 BKS 4 CCL 5 CSLL 6 CSLS CODE SAMPLE# UNIT 68 1 DIM 68 1 CPS 68 1 CPS 68 1 DIM 68 1 DIM 68 1 DIM BYTES 4 4 4 4 4 4 7 CSLT 8 CSS 9'' G1 10 G2 11 GElS 12 GR 13 ISS 14 LS 15 MON 16 MSD 17 PDKP 18 RATO 19 RBOR 20 RICS 21 RIN 22 SGMA 23 SGMB 24 SPD 25 SS 68 1 DIM 4 68 1 API 4 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 API 4 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 SU 4 68 1 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 SU 4 68 1 DIM 4 68 1 F/MN 4 68 1 CPS 4 * DATA RECORD DEPTH CSLL G2 MON RICS SS 9730.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9680.000 14.94643 3439.504 1997.436 15.26810 31198.39 9630.000 15.58598 3119.244 1997.345 12.67413 35189.29 9580.000 12.98484 4140.969 1999.091 12.39487 33867.91 9530.000 14.29604 3904.811 1999.430 12.46066 35120.82 (TYPE# BIF CSLS GElS MSD RIN -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7.817118 15.43158 118414.4 0.2490421 9.835123 3.430829 16.54266 111056.3 0.2525108 10.26727 4.306396 13.81191 107538.4 0.2362145 9.943090 3.755095 15.19810 108597.1 0.1828825 10.22498 o) 942 BYTES * BKL CSLT GR PDKP SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 108.5170 16.43238 71.86298 24.74626 16.68045 79.56902 17.19808 27.61066 26.52995 19.36897 82.11301 14.91439 21.30266 20.72902 15.59389 77.26701 16.27337 18.78499 26.49219 16.54463 BKS CSS ISS RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 269.3801 21980.29 324532.5 16.68767 81.57353 223.7210 22698.23 287484.6 18.07210 69.47249 234.5250 22599.91 286800.2 15.57538 67.98741 187.1280 22970.67 286886.3 17.46725 69.33365 CCL G1 LS RBOR SPD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 10219.41 1872.387 1.710116 13.99860 0.0000000E+00 10621.57 1947.651 1.467636 13.99860 0.0000000E+00 11470.16 2170.023 1.512634 13.99860 0.0000000E+00 11385.45 2009.009 1.514065 13.99860 9480.000 12.88490 4957.379 1999.917 11.98053 38920.77 9430.000 10.66664 5797.832 2000.681 11.59218 38806.59 9380.000 13.49531 5152.965 2000.799 12.58786 37681.37 9330.000 -999.2500 0.0000000E+00 0.0000000E+00 -5.000000 0.0000000E+00 4.204823 13.30100 117310.7 0.1690676 9.625252 5.255286 11.13619 120452.0 0.1902980 9.294407 4.541550 14.04079 120942.7 0.2919664 9.960978 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 5.000000 53.19400 14.70677 16.55403 14.67294 15.36195 49.18701 12.71988 16.46248 12.77189 14.10290 109.6540 15.60905 32.33385 13.61566 14.62834 0.0000000E+00 -999.2500 0.0000000E+00 -999.2500 0.0000000E+00 184.2830 25722.70 305134.6 14.09372 67.31516 247.3640 26517.14 308903.6 12.83583 68.95746 266.2571 25613.62 311815.7 12.94997 68.01111 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 -999.2500 0.0000000E+00 13555.11 2762.047 1.490538 13.99860 0.0000000E+00 14573.16 3027.446 1.522073 13.99860 0.0000000E+00 13373.55 2908.502 1.546286 13.99860 0.0000000E+00 0.0000000E+00 200.0000 -1.000000 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 94 9730.00 ENDING TAPE DEPTH = 9310.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 4 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 6-23 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 25 CURVES : NAME CODE SAMPLE# 1 BIF 68 1 2 BKL 68 1 3 BKS 68 1 4 CCL 68 1 5 CSLL 68 1 6 CSLS 68 1 7 CSLT 68 1 8 CSS 68 1 9 G1 68 1 10 G2 68 1 11 GElS 68 1 12 GR 68 1 13 ISS 68 1 14 LS 68 1 15 MON 68 1 16 MSD 68 1 17 PDKP 68 1 18 RATO 68 1 19 RBOR 68 1 20 RICS 68 1 21 RIN 68 1 22 SGMA 68 1 23 SGMB 68 1 24 SPD 68 1 25 SS 68 1 UNIT BYTES DIM 4 CPS 4 CPS 4 DIM 4 DIM 4 DIM 4 DIM 4 API 4 CPS 4 CPS 4 CPS 4 API 4 CPS 4 CPS 4 CPS 4 SU 4 4 DIM 4 DIM 4 DIM 4 DIM 4 SU 4 DIM 4 F/MN 4 CPS 4 * DATA RECORD DEPTH CSLL G2 MON RICS SS 9730.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9680.000 14.38226 3517.248 (TYPE# 0 ) BIF CSLS GElS MSD RIN -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7.537036 14.78274 123502.2 942 BYTES * BKL CSLT GR PDKP SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 146. 5870 16.34319 68.46582 BKS CSS ISS RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 349.3220 22607.09 338815.4 CCL G1 LS RBOR SPD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 10521.59 1943.019 ~2011.789 14.81706 31771.64 0.1636348 10.03458 30.18336 17.10533 16.38614 82.56889 1.688547 12.99870 9630.000 10.55006 71.78200 199.0240 0.0000000E+00 23.81023 25.63266 26.28590 10638.82 3893.920 846.5103 64887.02 28.69501 292626.2 847.1960 2012.655 0.6241066 27.67789 18.30531 1.899520 33.09564 10.61679 24.20987 107.9482 12.99870 15635.79 9580.000 19.83084 58.03900 198.6670 71.69998 12.20513 12.59486 14.21754 16000.17 10519.71 4099.895 65655.25 25.93604 285149.8 1792.968 2015.665 0.1401929 21.31931 13.06862 1.623135 17.82492 10.58064 14.16022 124.8116 12.99870 23541.61 9530.000 23.04642 67.14301 214.3750 0.0000000E+00 14.21103 14.32479 15.92250 15754.91 9701.461 3364.872 67349.81 18.77795 283515.9 1604.892 2017.807 0.1629536 26.94787 14.94241 1.610755 18.04382 10.53875 16.19263 140.8719 12.99870 23962.84 9480.000 24.62752 68.37001 205.1040 0.0000000E+00 12.43943 12.51458 14.59906 17805.15 11494.18 4455.316 73281.06 21.94527 304482.0 2243.485 1990.156 0.3652208 16.22039 11.86299 1.636003 17.44603 9.921492 14.29905 136.2740 12.99870 26599.69 9430.000 30.52088 70.40300 233.7960 0.0000000E+00 11.01522 10.87895 12.99484 17618.70 12031.16 5039.203 70125.19 20.26561 306128.4 2351.985 1989.620 0.1871217 14.48017 10.85222 1.650104 17.19592 9.605631 13.11856 143.6970 12.99870 25543.43 9380.000 25.54634 85.22202 269.5769 0.0000000E+00 11.84509 11.92187 14.12383 17241.98 11349.55 4831.867 71787.00 29.45418 309886.9 2437.579 1991.550 0.1823465 15.18999 10.22911 1.693157 18.32864 10.05396 12.98057 133.1246 12.99870 24882.85 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 -999.2500 9330.000 -999.2500 0.0000000E+00 -999.2500 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 -999.2500 -5.000000 5.000000 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 200.0000 -1.000000 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 94 9730.00 ENDING TAPE DEPTH = 9310.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 5 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 6-23 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 25 CURVES : NAME 1 BIF 68 2 BKL 68 3 BKS 68 4 CCL 68 5 CSLL 68 6 CSLS 68 7 CSLT 68 8 CSS 68 9 G1 68 10 G2 68 11 GElS 68 12 GR 68 13 ISS 68 14 LS 68 15 MON 68 16 MSD 68 17 PDKP 68 18 RATO 68 19 RBOR 68 20 RICS 68 21 RIN 68 22 SGMA 68 23 SGMB 68 24 SPD 68 CODE SAMPLE# UNIT BYTES 1 DIM 4 1 CPS 4 1 CPS 4 1 DIM 4 1 DIM 4 1 DIM 4 1 DIM 4 1 API 4 1 CPS 4 1 CPS 4 1 CPS 4 1 API 4 1 CPS 4 1 CPS 4 1 CPS 4 1 SU 4 1 4 1 DIM 4 1 DIM 4 1 DIM 4 1 DIM 4 1 SU 4 1 DIM 4 1 F/MN 4 ' 25 SS ; * DATA RECORD DEPTH CSLL G2 MON RICS SS 9730.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9680.000 15.11175 3348.777 1969.734 15.81545 30670.48 9630.000 23.68182 336.4919 1993.786 38.49721 11094.54 9580.000 11.67813 3688.324 1995.458 18.17812 21982.93 9530.000 13.80746 3235.900 1997.462 18.23436 22839.00 9480.000 12.36901 4138.937 1996.719 17.95941 24647.70 9430.000 10.74917 4927.508 1997.124 17.45935 24534.44 9380.000 10.64753 4394.387 68 1 CPS 4 (TYPE# 0) BIF CSLS GElS MSD RIN -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7.395778 15.10732 116638.7 0.1220188 10.25187 10.45461 24.38967 56004.22 0.7320697 10.76526 20.72546 12.13939 60899.07 0.1455721 10.28897 23.63034 14.04103 64179.38 0.2965716 10.58913 24.16014 12.52543 66808.94 0.2223604 10.00187 26.12202 10.76094 67646.69 0.1144996 9.622421 26.13708 10.75629 67247.44 942 BYTES * BKL CSLT GR PDKP SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 115.2400 16.80818 70.68816 28.79482 17.12122 53.79301 25.99857 26.74146 27.46004 28.31754 64.03201 13.80878 26.23564 19.70613 14.10388 64.98201 15.52135 22.03065 25.04731 16.12793 64.29102 14.17132 21.81519 15.67415 14.53973 66.77501 12.76099 21.57030 14.62143 13.03652 67.89201 13.10170 34.60692 BKS CSS ISS RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 321.8149 21653.11 323258.9 16.31923 83.45549 210.2960 8004.172 274239.2 19.24294 106.5371 209.6910 14720.22 269853.1 12.76054 126.4102 194.1990 15016.81 272897.0 14.71732 143.2625 213.9520 16489.43 290288.6 11.53438 139.5563 226.4780 16984.45 299054.7 10.54066 134.8929 233.5320 16260.86 296976.6 CCL G1 LS RBOR SPD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 10196.23 1876.373 1.714920 13.99860 70.19998 2027.432 573.7200 1.916342 13.99860 314.7000 9386.383 1720.448 1.595462 14.04020 0.0000000E+00 9233.008 1549.546 1.585867 14.59820 0.0000000E+00 10769.60 2131.873 1.580369 14.59230 0.0000000E+00 11570.95 2333.245 1.605657 14.59230 0.0000000E+00 10731.84 2279.893 '1996. 669 19.13.266 23605.28 9330.000 -999.2500 0.0000000E+00 0.0000000E+00 -5.000000 0.0000000E+00 0.2503164 10.29209 -999.2500 -999.2500 0.0000000E+00 0.0000000E+00 5.000000 13.48887 13.51092 0.0000000E+00 -999.2500 0.0000000E+00 -999.2500 0.0000000E+00 10.32993 131.6643 0.0000000E+00 0.0000000E+00 0.0000000E+00 0.0000000E+00 -999.2500 1.674503 14.59230 0.0000000E+00 0.0000000E+00 300.0000 -1.000000 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 92 9730.00 ENDING TAPE DEPTH = 9320.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 6 LIS .001 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : DS 6-23 CH/CNS FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 2 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 SGAV 2 PAVG : 68 1 68 1 * DATA RECORD DEPTH 9800.000 9750.000 9700.000 9650.000 9600.000 9550.000 9500.000 9450.000 9400.000 9350.000 9300.000 9250.000 9200.000 9150.000 9100.000 (TYPE# SGAV -999.2500 -999.2500 17.41261 14.38130 14.40579 20.44756 14.25743 12.24146 11.82820 13.76638 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 o) 1014.BYTES PAVG -999.2500 -999.2500 31.09816 25.19436 24.40923 30.60148 21.25172 14.34275 11.71257 17.45003 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** **** TAPE TRAILER **** LIS 90/12/20 01 18 9800.00 ENDING TAPE DEPTH = 9070.00 TOTAL RECORDS IN THIS LOGICAL TAPE : 538 **** REEL TRAILER **** LIS 90/12/20 AWS 01 TOTAL RECORDS IN THIS LOGICAL REEL : 539 TOTAL RECORDS IN THIS PHYSICAL REEL: 539 End of execution: Thu 20 DEC 90 2:57p Elapsed execution time = 53.05 seconds. SYSTEM RETURN CODE = 0 DIRECT DIGITAL LOGGING COMPUTER PROCESSED ANALYSIS Company ARCO ALASKA INC. We,Il DS 6-23 CH/CNS Field PRUDHOE BAY DATE OF dOB: 04-3 0-86 Count.~ HORTH SLOPE Stmtm ALASI<A Countr~, USA CL I ENT FORMAT DATA TAPE LOG I NF ORMA T I ON STANDARD FORMAT ( L , I , S , Well No,; A~C_~.O_ b____.-. _.,; ,~ .... Depths: ...... .,9076, O0 to 9801. O0 Fi e 1 d: PF,'UDH JE BAY DATE OF JOB: 04-30-86 k I TAPE RECORDS REEL HEADER **** ice name: ~G5FO"~ Prcviou~ r~el: TAPE HEADER HEADER Da'tm: 8G/'05/28 Origin: Commentz: Service ,namm: &GSFO'I Da'tm: 86/05/28 Origin: Previous tape: Comments: RECORDS Reml nmme~ ~,47259 Tape name: J47259 Continuation Continumtion #: 01 EOF FILE HEADER File n~me~ &GSFOi .001 Maximum length: '1024 HEADER RECORDS Service name; File type: L.O Vmrsion Date: Previous Page MNEM CN WN FN COUN STAT CTRY .SECT TOWN RANG EKB EDF EGL PD LMF DMF RUN LCC SON LUll FL LUL ENG I WITN DD DL TLI BLI T C S TLAB BHT MRT MT hiSS MVIS R~ MFST MFSS RMC MCST MCSS C,O H T E N l* S ARCO ALASKA INC. DS 6-23 CH?Ct,iS PRUDHOE BAY NORTH SLOPE ALASKA USA 74., · 00 , , . 73,. 000 . , , 37,0;00 , , , KB':~ .347~59 . . , 7542 , ,, NORTH SLOPE NORTH SLOPE HUPP FIFE 9781, O00 .... 9080,80 0 .... 977~, 090 .... 0, :000 ....... 0,000 O, 00~ ....... CRUDE 0.. {300 0, '{3.00 0 ' 0 mO 0 6: 6.6 6 0.000 i i r I i · D~TE OF' I N F 0 R M A JOB 4 $ ! 04-3 TION RECORDS UNIT TYPE CATG SIZE CODE 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 0 0 2 65 0 0 3 65 0 0 3 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 0 3 2 65 :0 S 2 65 O 3 2 65 0 0 2 79 O O 2 79 0 0 I0 65 0 0 l0 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 J 4 68 HR 0 2 4 68 HR 0 4 4 68 DEGF 0 i 4 68 DEGF 0 I 4 68 0 2 20 65 0 2 20 65 CP 0 2 4 68 OHMM 0 2 4 68 OHMM 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 OHMM O 2 4 68 DEGF 0 2 4 68 0 2 12 65 Page: COMMENT RECORDS This LI~:~ tape was written by Gearhart Industries (~ir. el ine. Services, All curve and 'tool mn~_monic.~ uzed arc :.those which most closely match ** :Gearhart curve and tool mnemonics, ** GEARHART TO SCHLUMBERGER MHEM SERVICE UNIT MHEM SERVICE UNIT ,DEPTH FEET DEPT FT G.R MERGE GAPI GR MERGE GAPI CCL MERGE MV CCL MERGE MV F~,NL MERGE CPS FCNL MERGE CPS NCNL MERGE CPS NCNL MERGE CPS NPH'S COMPUTED .$$PU NPHI COMPUT PU RAT COMPUTED NRAT COMPUT AYG COMPUTED AVG COMPUT DATA ENTRY BLOCKS *~*~ ENTRY F 0 R M A T SPEC I F I CA TYPE SIZE CODE 0 'i 66 TIONS Page :**.* ENTRY BLOCK LEGEND TYPE DE~uRIPTION '0 Terminator < no more ,entries ) DATA FORMAT SPEC I F. I CAT I OHS DATUM SPEC.IFtCAT.ION ,BLOCKS mmmm MNEM SER¥IC.E SERVICE APl AP1 APl AP1 FILE ID ORDER # UNIT 'LOG TYPE CLASS MOD # DEPT 347259 FT '0 0 GR MERGE 347~59 GAPI '0 54 1 0 0 COL MERGE 347259 MV 0 1~,0 1 0 0 FCNL MERGE 34?259 CPS ::0 78 31 'NCNL ME~GE 34?259 CPS 0 78 ~0 0 O NPHI COMPU'T 34?259 PU 0 122 2 0 O NRAT COHPUI' 34?259 0 ,O 0 0 O AVQ COMPUT 347259 ..... 0 PRC SIZE LVL 9HPL RC 4 0 1 68 4 0 1 ~8 4 0 ~ 68 4 0 1 68 4 0 1 68 4 0 1 68 4 0 1 68 PROCESS iNDiCATORS 000000 00000:0 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Pag.e: DATA RECORDS NCNL NPHI NRAT AVG 0,000 -6,684 -999 250 -252.842 Page 9698,o5:00 22,4:0:0 1 , 130 276. 480 323. 700 27 890 1 196 26,925 9598,5:00 29, ,300 , .380 476 , '0'00 514.300 22 450 061 22,9'15 9498,500 27.900 ,520 452,308 508,900 25 75 0 ! t45 23.695 9398,5!00 26,800 .220 890,800 76.7,800 11 348 850 11. 170 9298,580 25,60'8 ,350 524.400 576,900 21 930 1 065 ~8,457 9198,5.80 27.40,0 ,290 581.480 582.70,0 17 581 I 16,854 909,8,500 52,.300 , 250 41:3 , 600 472.800 23 920 1 208 22,445 File n~me.: &GSFOJ.OOJ Maximum length: 1'02.4 TRAILER RECORDS Service nam.e: File type: LO Version ,~: Next ¢ile: EOF mmm File name~: &'~SF01 ,Mmximum length:, 1024 HEADER RECORDS Sepvic~ name: Film 'tppm: LO Verzion #: Previous ~ile: Dmte: Page 10 MNEM CN WN FN COUN STAT CTRY SECT TOWN .RANG EKB EDF EGL PD LHF DMF RUN :LCC BON LUN FL LUL E N G I WITN DD DL TLI BLI TCS TLAB 8HT HRT MT HSS MVlS RM RMF MFST MFSS RMC MCST MCSS CONTENTS ARCO ALASKA INC, DS 6-23 CH/CNS PRUDHOE BAY NORTH SLOPE ALASKA ,USA '1 !ON 14E ...... 74 .. 0'0'0, .73,0.00, 37,00,0. , HS KB ........ 347259 . 7542 NORTH SLOP NORTH SLOPE HUPP FIFE 9781 , 9780.0 O0 ..... 9:'080.000 9778.0 0 .,. :'000 ........ · 0., 00 O. 0,0.'00 0., '0'00 ........ CRUDE O..OO 0, O, ~000, O, .00 0. 0..000, INFORHA JOB TIOH RECORDS UNIT TYPE CATG SIZE CODE 0 0 40 65 0 0 40 65 0 0 40 ~5 0 0 20 65 0 0 20 65 0 0 20 65 0 0 2 65 0 0 ~ 65 0 0 3 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 :0 3 2 65 0 3 2 65 0 3 2 65 0 0 2 79 0 O 2 79 0 0 t0 65 0 0 10 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 HR 0 2 4 68 HR 0 4 4 68 DEGF 0 ~ 4 68 DEQF 0 i 4, 68 0 2 20 65 0 2 20 65 CP 0 2 4 68 OHHH 0 2 4 68 OHMM 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 0 2 4 68 0 2 4 68 0 2 12 65 OHMH · DEGF Page 11 COMMENT RECORDS mm This LIS tape was wriE~tmn by Gmarhart Industrims Wirmlinm Smrvices. mm mm All curve and tool mnmmonics usmd are those which most closely match mm GEARHART TO SCHLUMBERGER MHEM ,SERVICE UNIT MNEH SERVICE UNIT DEPTH FEET DEPT FT GRI MERGE. GAPI GR :MERGE GRPI CCL1 MERGE MM CCL MERGE MV FCNL'1 MERGE CPS FCNL. MERGE CPS NCNL1 MERGE CPS NCNL MERGE CPS NPH$'I COMPUTED SSPU NPHI COMPUT PU RATI COMPUTED NRAT COMPUT Page 12 ~ATA ,~,~ ENTRY BLOCKS ENTRY ~m,m,~ ENTRY'8LuuK' '~' LEGEND TYPE DESCRIPTION Terminator.( no morm mn.trims ) FORMA TYPE T SPECIFICA olZE CODE 0 'I 6 6 T IONS Page.: ,DATA FORMAT 'SPEC I F I CAT IONS .DATUM SPEC.IFICATION 8Lu;~k~, m.mm.m MNEH SERVICE.SERVICE APl AP1 APl APl FILE ID ORDER ~ UNIT LOG TYPE CLASS MOD DE,PT 347259 FT 0 0 0 0 0 GR MERGE 34,7259 GAPI 0 54 i 0 i CCL MERGE 347259 MV 8 150 i 0 i FCNL MERGE 347259 CPS O 78 31 0 1 iNCNL MERG'E 347259 CPS 0 78 30 0 I NPHi COMPUT 347259 PU 0 122 2 NRAT COMPUT 347259 .... O 0 O O PRC # SIZE LVL SMPL RC 4 0 i 68 4 0 i 68 4 0 1 68 4 0 i 68 4 0 1 68 4 0 1 G8 4 0 i 68 PROCESS iNDiCATORS 000000 000000 000000 ,000000 000000 000000 000000 000000 000000 O00000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page 14 DATA RECORDS DEPT GR CCL FCNL NCNL NPHI NRAT 9796,5:00 ,O,OOO ,O,O'O0 :O,OOO O,O00 16 675 -999 250 Page 15 9696°500 25,?.00 1,080 299.900 350.100 9596,. 5 00 26.. 60 '0 · 500 4.69,000 5 i 8.200 27 440 24 110 i 156 1 114 9496. '5 00 ,30 · 5'00 , 68 O 607 . 700 64 i , ,300 21 300 1 121 9396,.5':00 25,500 ,250 985,2.00 817,600 10 ,SiS 885 9295,.500 .2.7,800 ,700 67i,:0'00 651,800 17 759 988 9196,:50:'0 55,0,00 .270 62-,7,. 1,0:0 612,300 19 098 ,,998 9'096,500 52.600 ,380 471 .lO0 513.100 23 970 .090 Fi: ~ n~me: ~t~.5F'O"J . 0::02 M a.x i m u m 1 ~ n.g :t. h: 1:0 2 4 TRAILER RECORDS ~er,vice Version '#: ,Film type: LO Nm×t '?il~: Page 16 EOF File name.', ~GSF01.0'03 Maximum length: '1024 HEADER RECORDS Smrivicm namie: File type: LO Version ~: Pr. eviou~ ?il~: Date: 17 CH WH FN COUH STAT CTRY SECT TOWN RANG EKB 'EDF EGL PD LNF DMF RUN LCC SON LUN FL LUL E N G I W I T N DD DL TLI BL I TCS TL~B BHT HRT HT NVIS RH RHF MFST HFSS R~C RCST NCSS INFORMATION RECORDS L: JN FENTo ARCO ALASKA INC, DS; 6-23 CH/'CHS PRUDHOE BAY NORTH SLOPE ALASKA USA 02, iON 74,000 73,0.'00 , 37, O0 HS ...... KB, ..... 30 ...... 347259 , , 7542 NORTH SLOP~ NORTH SLOPE HUPP F]FE 9781 , 0 O0 .......... 97.80 , 00 0 .......... 9'080 , 000 .......... 9778,000 .......... O,,OOO ............. O, 0 O 0 ............. O, OOO ............. O,OOO ............. CRUDE "666 ............... 0 : 0, OOO ............... 0,000 ............... 0. O.0 0 ............... DATE OF JOB: 04-30-86,,, ~ I I I a I J u i a i i i i , m r ~ r ~ , UH I T TYPE C'ATG SIZE CODE 0 0 40 ,~, 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 6.5 .0 '0 20 65 0 0 2 65 0 0 3' ,65 0 0 3 65 F T 0 3 4 :S 8 F 'F 0 :~ 4. 68 FT 0 :3 4 68 0 :3 ;.?. 65 0 :$ 2 65 0 .3 '":,' ~: ~' 0 0 ':' '"" 0 0 2 79 0 0 't Cf 65 0 0 iO ~5 0 0 20 65 0 0 20 .¢:, .j 0 0 '" g =' 0 0 '20 65 FT 0 23 4. 68 FT 0 .3 4 6,9.' FT 0 3 ,...1. 6,8 FT O 3 4 68 HR O 2 4 bo HR 0 4 4 68 DEGF O 1 4 68 OEGF 0 i 4 68 0 2 28 65 0 2 28 65 CP O 2 4 68 OHHM 0 2 4 68 OHMM 0 2 4 68 DEGF O 2 4 68 0 2 1 '2 65 0 lq bi H 0 2 4 68 DEGF 0 2 4. 68 O 2 t2 65 Page 18 COMMENT RECORDS :~.:~ This 'LIS :t. mpm was: writ. tan ** .All curve mhd tool mnemonics usmd arm thosm which most closely match ** *. Gearhart. curve and t. ool mnmmonic~, GEAR HA RT TO S CHLUHBERG'ER MNEM SERV ICE UHI T MNEH SERglCE UNIT DEPTH FEET DEPT FT ,~ MERGE GAPI GR MERGE GAPI CCL2 MERGE NV CCL. MERGE FCNL2 MERGE CPS FCNL MERCE CPS NCNL2 MERGE CPS NCNL HERGE CPS HPHS2 COMPUTED SSPU NPH I COMF'UT PU RAT2 COHPUTED NRAT COHPUT ...... 19 DATA ~ENTRV ::~:.~:~ ENTRY BLOCK LEGEND TYPE DESCRIPTION 0 Terminator ( rio more ~ntci~s ) FORMA T S P E C I F I C A TYPE '~' ,... oI?E CODE 0 1 66 TION~ 20 DATA F 0 R M A T DATUM ~SPECIFICATION 8L, OCKS .mmm SERVICE SERVICE MNEM ID ORDER :# APl APl AP1 'APl FILE UNIT LtL~ TYPE CLASS MOD DEpT GR MERGE ,C C2 .~,., :MERGE FCNL 'MERGE NCNL 'MERGE NPHI COMPUT NRAT COMPUT :34?259 FT 347259 GAPI ~47259 MV 34?259 CPS 34?259 CPS ~47259 PU 347259 ..... 0 0 0 0 0 0 54 1 ,0 2 0 '~ 50 j 0 2 :0 ?8 :30 0 2 0 J22 2 0 2 0 0 0 0 2 SPECIFICATIONS PRC ~ ~,i?E LVL SMPL RC 4 0 1 G8 4 0 1 68 4 0 1 68 4 0 J G8 4 0 1 68 4 0 J 68 PROCESS INDICATORS 000000 000000 000000 000000 00000~0 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 O00000 000000 2J DEPT GR CCL 98'0'I . 0 00 0,0 0 0 O, 000 DRTA RECORDS NPHI '16,728 NRAT -999 250 Page 22 9701 , 0'00 21,600 .'i90 266,700 316,400 28,430 1 228 9 G 01 , 0:0,0 ,3'9, .9 '00 .240 547,900 571.800 22,160 9501 . 0 O0 700 , 120 682,5:00 681 , 200 19,750 1 052 940'1.0 00 22,2'0:0 .340 1.074,500 884,200 i O. 422 860 9,3 01 . 0 0 0 2,6,20,0 ,150 691,8.0'0 682,800 18,723 022 9 201 . 0 ,'0:0 29.7:0'0 ,190 76t,100 700,800 15,786 959 9101.000 55,900 , :370 463. 000 526 . 600 25,480 I 190 1'1a x i m u m I,~ n g t h: 1 0 24. TRA l LER RECORDS File typ.m: LO Vei,-sion ~: Next Date: .3 '.* EOF *** EOF DEC 0 51~ *********************** Alaska Oil & Gas Cons. commission Anchorage V ~ R OOO 000 O15 065 000 000 0 n 4 065 000 000 01 1 065 000 000 003 065 O00 000 003 065 000 000 001 0~5 OOO OOO 00~ 065 OhO OoO oO~ 065 000 000 09,3 065 ===; ..... ============================================== 1' i?, C , APff U~]i'~SITY = t~Of', i:sPI d(3[,~ fl ,59756 BASh; L,O(;: CH (22, RLI[t ~ 1 0 Fi'. PT 4 (;APl, OO 310 01 0 0 4 P U 00 890 00 0 0 4 00 420 01 0 0 4 o 0 000 00 0 0 4 C P S 00 330 31 t) o 4 CPS o0 330 30 o 0 4, 00 1. 5 0 01 0 0 4 GAPl' O0 310 O1 0 0 4 P d o 0 890 00 0 0 4, 00 420 01 0 0 4 O0 000 O0 0 0 4. CPS 00 330 31 0 0 4 CPS 00 330 30 0 0 4 O0 15n r~l 0 0 ~ G A P i 0 O 3 1 0 01 (.) 0 4 P t,~ O 0 890 00 () a a 0 0 420 0 1 O 0 4, 0 (1 000 00 0 0 4 C F S 00 33 c 31 0 t) 4 CPS mi) 330 3o O 0 a 00 15 O O 1 0 0 4 APl apl AP1 APl F.tl.,g SIZE SPL bOG TYPE Ct.,A~$ 0 0 0 0 0 00 0 0 PROCESS COOE (OCTAL) 1 68 00000000000000 1 68 00000000000000 I 68 00000000000000 i 68 OnOOO000oOOOOO 1 68 00000000000000 1 68 O0000000OO00Oo i 68 O0000000000OO0 1 68 O00000UOOOOOUO I 68 0000000o()00000 I 68 00000000000000 1 68 ()0000000000000 1 68 00000000000000 1 68 0000000o000000 I 68 O000OO0000000O 1 68 00000000000000 1 68 O00000OOOO0000 1 68 00000000000000 1 6~ O000uO00000000 1 68 0000000000000() I 68 OOOO0000000000 1, 68 00000000000000 1 68, OOOO0000000OO0 94t)O.r;O00 : 18. 1. 719 ,',~ P H 't ', hi L 3580.00 {7) 0 b-' C N 1'., 'H:i 8.789t HRAT. : l~: L., 2129, OOn<) CC!., q P "1' 91. 0 o, n 0 n 0 G ~ ~ 6 ~. c4250 ~'? P T'~ i 3 1,. 7031 697,0000 -99o 2500 -999. 99 9.2 500 -a99. ?500 ~0. 2. 4:531 1514.00 o o 26,7090 51;,0000 0.0838 29,625d 2512. 0000 3.,) 25 4' 9r 88~ 5O00 2 .~320 ~ 04PO 1.9.3'750 2332. 0000 23.5352 895. 0000 2.8262 0, Ob,~ 3 17. 36 ! 0. R . 4,:i73 2POP,. I .6533 0. 0521. CC L, ~!puI F C N b C C L CCI., P a R A [t p H 1 F'CNb N R~ 7' CC L r: P H ] eCL R ,'; R A 21.. ~906 !": PHI 2712.0000 F (.'. ~'.] b 16,2598 1167. ':) O 0 t) CCI, 2,924(4. P t'q P ~ O. 1 23.0531 269n'r~OnO 16.7969 122~.0000 2,207~ O.OG~9 64. 2434 23 ,, '7305 CCI, P ,>., R g F C ~ L ;'..: k ~ T 24.8535 5 'i 3,0000 C C I.., 2,8672 R ,.'~. A -0 , 01.06 2.8.457 ~CI'a L 24.~b35 NRAT 91~,O00U CCL ..6953 RN~A 0,0846 GR 2,932u NCNB 9.2285 2066.0{)00 CCI I ,621 t P r,"RA -0.0106 1. 6504 1,123.0000 CC.',., 2.2324 o.0106 2.2129 NCNb 16,5039 1221.0000 CCI., 2.2695 RhRA O.Ob02 2.2168 NC~L 952.0000 CCI'., 9.7(}5! P'''~ ' 2.7656 0.0'165 2.8711 18,4688 14~0,00~0 2. 7095 0. 0594 2,7168 20. ,2{)31 2428. O(JO0 2.7 (> 7 (,,~ O. 076b 2.5352 22,9844 25OO. 0000 I ,6895 0.0903 I . & 21 1 19.9697 3504. 0000 2,3770 '3 0553 2:361.3 22,9375 264&,0000 0,04~8 2 2578 2g. 31 25 2'134.0000 2.656-3 0.0879 2.6797 P 0In. U02 VE~'TF'[C, ATI'.Om t,TSq'I~G PAGE 5 gl q. fiOOo CCL 937,50 o 0 .74 2 -999 2500 -o99: ~'500 12,3047 1555 ~ 0000 ... ~,, 2bO0 C C L FC C C 0033 8008 -g99.250U NR~T -~.~9g, 2500 ..tL 0.1107 GR 375" 25 7 -999.2500 -999,2500 1,8994 -999,2500 -999,2500 EOF DIRECT DIGITAL LOGGING Compan.~, ARCO ALASKA INC. Field PRUDHOE BAY Count~¢ NORTH SLOPE State ALASKA Oountr~ USA CLIENT FORMAT DATA TAPE LO6 INFORMATION STANDARD FORMAT ( L, I , S, ) Well No,: ARCO Depths: 8984.00 to Name: DS 6-23'CH/CN~ Fizld: PRUDHOE.iBAY T' ~. am_: 10:40 AM FRI, Page: ..... ~ ............... ! ................. I, S, TAPE RECORDS *-** REEL HEADER S~rvice name: ~GSFOI Previouz reel: HEADER Date: 84/05/11 Origin: Comments~ RECORDS Reel name: 281779 Page 2 Continuation #: 01 ~*.** TAPE HEADER c. er~,'ice name: &GtF01 Previous tape: 84/05/11 Origin: Comm~nt~: Tape name: 281779 Continuation #: 01 EOF *** FILE HEADER Film name: &GSF01,00~ Maximum l~ngth: 1 024 I HEADER, RECORDS Service name~ Fil~ %yp¢: LO Vmrzion'~: Previous H N E M CN WN FN COUN .STAT CTRY SECT TOWN RANG EKB EDF EGL PD LHF DMF RUN LC,C SON LUN FL LUL ENGi WITN DD DL TLI 8LI TCS TLAB BNT MT MSS MVIS RM RMF MFST HFSS HCST HCSS CONTENTS ARCO ALASKA DS 6-23 CH, PRUDHOE BAY NORTH SLOPE ALASKA USA 1 ON i 4E ...... 74 000,, ?~ '000, . S7 000,, SL KB ...... K8 i i I I I I ~ 1 79 76i i NOETH SLOPE NO~TH SLOPE WAITE HOLMAN 9785, O 00. 9785,00 ~. 9OOO,OOO. 9785.000. 0000 ..... 0 000 ..... 0 000 ..... 0 000 ..... C~ UDE ~ i ~ I 0 O0O .... 0 000 0 008 .... ' '66 .... 0 0 .... 0 008 .... INC, I m I I I INFORMA ! i i t i t i i i TI'ON I I I m ! I I I I I I I ! ! I I I I II I I I I RECORDs UNIT TYPE ' CATG SIZE CODE 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 2 65 0 0 3 65 0 0 3 65 FT 0 3 4 68 FT' 0 3 4 68 FT 0 3 4 68 0 3 2 65 0 3 2 65 0 3 2 65 0 O 2 79 0 0 2 79 0 0 10 65 0 0 1 0 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 HR 0 2 4 68 HR 0 4 4 68 DEGF 0 1 4 68 DEGF 0 I 4 68 0 2 20 65 0 2 20 65 CP O 2 4 68 OHMM 0 2 4 68 OHMN 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 OHHH 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 Pagm COMMENT RECORDS Thi~ LIS tape was ~ri~ten by Ge~hart Industri~ ~ireline Services, All curve and tool,mnemonics'used are thos~ which most closely match q~arhart curve and.tool mnemonics, GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT MNEM SERVICE' UNIT DEPTH FEET DEPT GR MCP QAPI GR GAPI CCL MCP MV CCL MV FCN$ MCP CFS FCNL CPS NCNS MCP CPS NCNL CPS CNS$ MCP ~ SAND NPHI PU RAT COMPUTED RAT AYG COMPUTED Page DATA ENTRY BLOJ;Kc~ ~ ENTRY ENTRY BLOCK LEGEND TYPE DESCRIPTION 0 T~_rminator ( no morre. ~_ntri~_~ ) FORMA T SPEC I f I CAT IONS TYPE SIZE CODE 0 1 66 Page OATA FORMAT DATUN SPECIFICATION 8LOCKS **** SERVICE 'SERVICE AP1 AP1 APl APl NNEH ID ORDER t~ [JHIT LOG TYPE CLASS I~IOD DEPT 281779 'FT 0 0 O 0 GR 281779 GAPI 0 31 0 0 CCL 281779 MV 0 0 0 0 FCNL 281779 CPS 0 0 0 0 NCHL 281779 CPS; 0 0 0 0 NPHI 281779 PU 0 68 3 0 RAT 28J 779 0 0 0 O AVl,; 281779 0 O 0 0 SPECIFICATIONS FILE P'RC # # SIZE LVL SMPL RC 0 4 0 I 68 0 4 0 J 68 0 4 0 I 68 0 4 0 1 68 0 4 0 1 68 0 4 0 1 68 0 4 0 i 68 0 4 0 1 68 PROCESS INDICATORS 000000 00000,0 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 O000OO OOOO00 OOO000 000000 000000 000000 000000 Page Page_ 8 [:,EP T GF~. CCL F ~, N [... NCNL NPH I RAT AYb ~829 000 0,000 0,000 310,400 302,600 15,750 ,975 -745,313 97'29 0 O0 40,50'0 , 090 271 ,500 362,600 35.820 1.336 27.478 9629 0 O0 27,800 .930 473,000 548,100. 25,440 1.15.9 24,630 9529 0 O0 22,5'00 , 060 467,400 542,200 25,270 ! . 160 :25,095 21,200 ,130 887.600 788,300 11.960 ,888 12.048 9329 000 24,7'00 , 080 625,500 661,900 16,640 1 , 058 i6,688 42,300 , 040 535,500 550,800 1 7. 920 1 , 029 18,550 9i29 000 124,600 , 180 417.80.0 514,400 28,650 1,231 27,343 9029 000 93.000 ,170 288.90'0 387,800 38.990 1,342 35,615 FILE TRAILER File name: &GSFOl,OOi Maximum lmngth: !024- Service,name: TRA I,LER RECORDS Version#: Date: Fil~ type: LO Nm×t {ile: Page * EOF *** File name: &~SF01,002 name: HEADER RECORDS Version #: Date: Page Maximum length: 1024, File type: LO Previou~ ?lie: MNEM CN WN FN COUN STAT CTRY SECT TOWN RANG EKB EDF EGL PD LMF DHF RUN LC,C SON LUN FL LUL ENGI WITN DD DL TLI 8Li TC8 TLAB BHT HRT HT MSS HVIS RM RMF MFST MFSS MCST MCSS CONTENTS ARCO ALASKA INC, DS 6-2,3 CH/CN$ PRUDHOE BAY NORTH SLOPE ALASKA USA 1 ON. , , 14E, ,, 74, OOO 73, 37' ~'000 SL .... KB .... KB .... 30 .... 2.81779 7611 ,, NORTH SLOPI~ NORTH SLOPE WA I TE HOLHAN 9785,000,., 9785,000, , , 9000,000,,, 9785,000.., 0,000 ...... 0,000 ...... O, 00.0 ...... 0.000 ...... CRUDE 6'666' " m r 0,000, .. 0,000, ,, 0.000. ,, 0,000, ,, 11 l t It It 11 11 It It J t i ! i 11 It I m t i a · INFORMATION 1 $ 11 m t ii 11 ! 11 l i I 11 i I I I i ii 11 ! 11 11 I III r I · i i 11 11 Its t II I II I I m II i · : Ima :1 I RECORDs I ! 11 I I I I · , I ; I It I I I i I i i SIZE CO DE 0 0 40 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 2 65 0 0 3 65 0 O o ~ 65 FT 0 3 4 FT 0 .3 4 68 FT 0 3 4 68 0 3 2 65 0 ,3 2 65 0 3 2 65 0 0 2 79 0 0 2 7.9 0 0 10 65 0 0 10 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 HR 0 2 4 HR 0 4 4 68 DEGF 0 1 4 68 DEGF 0 1 4 68 0 2 20 65 O 2 20 65 CP 0 2 4 68 OHMH 0 2 4 68 OHHM 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 OHMH 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 11 COMHENT RECORDS This LIS %ape ~as writ%eh by ~earhar~ Indus%ri. es Wireline Services. All curve and tool,,mnemonic~'uzed are tho~e which most closely match ~arhart curv~,an~, tool mnemonics, ~EARHART TO $CNLUMBEROER MNEM SERVICE UNIT MNEM SERVICE' UNIT' DEPTH FEET DEPT FT CNSSl MCP ~ SAND NPNI PU ~R1 MCP ~API ER ~API CCL1 MCP NV CCL MV FCNSl MCP CPS FCNL CPS NCNSi MCP CPS NCNL CPS RAT1 COMPUTED RAT Pag~ DATA ENTRY BLO~K~ mm~$ ENTRY FORMAT TYPE SIZE SPECIFICA CODE 0 1 66 TIONS 13 ENTRY 8LO~K LEGEND TYPE DESCRIPTION 0 Tmrminator ( no,morm mn~rim~ > DATA FORMAT SPECIFICATIONS DATUM SPECIFICATION 8LOCKS **mm i~NEM SERVICE SERVICE APl APl AP1 APl FI,LE !" ID ORDER ~ UNIT LO;~ TYPE CLASS lqOD # DEPT 281779 'FT' 0 0 0 0 0 NPHI 281779 PU 0 68 3 0 1 {;;R 281779 GAPi 0 31 0 0 1 CCL 281779 NV 0 0 0 0 1 FCNL 281779 CPS 0 0 0 0 1 NCNL 281779 CPS 0 0 0 0 1 RAT 28177SJ 0 0 0 0 i PRC # SIZE LVL SMPL RC 4 0 1 68 4 0 1 68 4 0 I 68 4 0 1 ,68 4 0 1 68 4 0 I 68 4 0 I 68 PRO].;ESo ~ ND I tJATOR.'_, OOO000 000000 0000'00 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page 14 DATA RECORDS NCNL 335. 300 9710 96t 0 500 26,550 54,400 ,2.30 3:04,000 50.0 20,930 40, ?00 , 020 516,300 364,400 561,400 1.199 1,087 951 0 500 25. 600 26,800 , 030 507,1 O0 567.900 1,120 94! 0 500 11 , 1 O0 26,200 . 070 922,400 785,100 .851 93t 0 500 22,890 46,200 . O1 0 506,400 568,000 1,122 921 0 500 20.480 29,500 . 050 582,700 608,700 04.5 91 I 0 500 2.8,040 159,400 . 060 355,500 435,500 1,225 9'01 0 ~00 47.21 0 5,°.,,900 .030 203,300 290.700 1 ,430 FILE TRAILER File name: &GSF01,002 TRAILER RECORDS I~II M~ximum l~_ngth: 1024, FiI~ type: LO N~xt ?i 1~: Date: Page 16 EOF FILE HEADER name: &~SFO Mm×imum lmngt, h: 1024, HE~DE~ RECORDS Film typm: LO Vzrsion#: Pag~ 17 H N E M CN" WN FN COUN STAT CTRY SECT TOWN RANG EKD EDF EGL PD LMF DMF RUN LCC SON LUN FL LUL ENGI WI TN DD DL 8Li TC:S TLnB BHT HRT HT MSS MY~S RN RHF MFST MFSS RHC MCST biCSS CONTENTS ARCO ALASKA INC. DS 6-23 CH/CNS PRUDHOE BAY NORTH SLOPE ALASKA USA 1 ON ........ 14E ........ 74,800 ..... 73; OOO ..... 37.000 ..... St. t<8 ......... ~0 ......... 281779 ,., 76i i . NO~TH ~LOPE NORTH S~OPE ~IT~ 9785.000 .... 9785,000 .... 9000.000 .... 9785. 000 .... O. 000 ....... O. 000 ....... 0,000 ....... O. 000 ....... CRUDE a Iltlll 0.000 ....... 0,000 ....... 0~000 ....... ~ m a m i l i I i m I i flail SlIll lllll ImIII IIIlI 1II III III iii Iii iil III Iii I NFORMA I ii ii i i m I I & Ii I I I ii i ,m I TION i 1 I a Ii m I I 1 t I i i I I ii I i Ii I m I i m m · i i I i I i l i I i i i i i I RECORDS ir, $, i i ii i ii I i ii 1 i i, i ii m l I ii i i ii m I i I I · I ir I i i UNIT I I II TYPE SIZE CODE 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20' 65 0 0 20 65 0 0 2 65 0 0 3 65 0 0 3 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 0 3 2 65 0 3 2 65 0 3 2 65 0 0 2 79 0 0 2 79 0 0 10 65 0 0 10 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 HR 0 2 4 68 HR 0 4 4 68 DEGF 0 1 4 68 DEGF 0 1 4 68 0 2 20 65 0 2 20 65 CP 0 2 4 68 OHHH 0 2 4 68 OHMM 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 OHHH 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 18 CO I IENT RECORDS All curve and tool mnmmonicz used ar~ thoze which mozt clozmly match G~arhart curve and~tool mn~monicz. GEARHART TO SCHL. UMBER~ER MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH FEET DEPT FT CNSS2 MCP ~ SAND NPHI PU NCNS2 MCP CPS, NCNL CPS GR2 ~CP GAPI GR GAPI CCL2 HCP HV CCL MV FCNS2 MCP CPS FCNL CPS RAT2 COHPUTED RAT P~g~ DATA ENTRY BLOCKS ENTRY ENTRY BLOCK LEGEND' mmmm TYPE DESCRIPTION 0 Terminator ( no'more,~ntries ) FORMAT SPECIFICA TYPE SIZE CODE IIII I(II IIII 0 1 66 TIONS DATA FORMAT SPEC 1 F I CAT ION$ · ~.~ DATUN SPECIFICATION SERVICE SERVICE APl AP1 APl API FILE ORDER # UNIT LOt TYPE CLASS MOD ~ PRC # SIZE LVL SHPL RC PROCESS INDICATORS OEPT NPHI NCHL GR CCL FCHL RAT 281779~FT 0 0 0 0 0 281779 PU 0 68 3 0 2 281779 CPS 0 0 0 0 2 281779 GAPI 0 31 0 0 2 281779 HV 0 0 0 0 2 281779 CPS 0 0 0 0 2 28i779 0 0 0 0 2 4 0 1 68 4 0 1 68 4 0 1 68 4 0 1 6,8 4 0 1 68 4 0 1 68 4 0 i 68 000000 000000 0000'00 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 0,00000 000000 000000 000000 000000 Page 21 NCNL '331 ,200 DATA O, 000 RECORDS CCL FCNL RAT 0.000 232.700 1,423 Page 22 9711 , 000 25,260 366,600 8:6,400 · 030 322.500 1,137 9611,000 20,880 588,400 29.000 .010 558,. I O0 1. 054 95;11 . 000 23. 040 5;60.800 24,000 O. 000 499. 000 1 , 124 9411.000 11.700 744,S00 27,400 030 854.500 ,871 9311.000 21,330 588.800 36,80'0 .090 536,100 1 , 098 9211 , 000 19,700 611 ,200 30,400 ,050 576,500 1 , 060 9111 , 000 29.940 429,500 180.900 · 070 344.000 1 ,249 9011,000 50,010 294.400 5':3.700 ,010 203.800 1,445 FILE TRAILER ~ile oame: &85~O!.O0~ Service'name: TRAILER RECORDS Maximum lmngth: J024 Film type: L.O Version#: Date: Page *EOF *** * EOF