Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
182-168
• STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25 105 20AAC 25.110 C Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., o Aban 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 6/3/2012 182 - 168 312 - 092 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 11/8/1982 50 029 - 20842 - 00 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 11/21/1982 PBU B -20 564' FNL, 1895' FEL, Sec. 31, T11 N, R14E, UM 8. KB (ft above MSL): 80.03' 15. Field / Pool(s): Top of Productive Horizon: 815' FSL, 671' FWL, Sec. 29, T11 N, R14E, UM GL (ft above MSL): 43.03' Prudhoe Bay / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): 906' FSL, 866' FWL, Sec. 29, T11 N, R14E, UM 9670' 8891' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 663734 y- 5950080 Zone ASP4 10047' 9252' ADL 028310 TPI: x 666265 y 5951515 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x - 666457 y - 5951610 Zone ASP4 None 18. Directional Survey: 0 Yes 1E1 No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: GR / SP / DIFL / BHCS / CNL / CDL / CAL, CBL / VDL / GR / CCL, Gyroscopic Survey N/ 23. CASING, LINER AND CEMENTING RECORD V SETTING DEPTH MD SETTING DEPTH TVD HOLE CASING WT. PER FT. GRADE To BOTTOM ToP I BOTTOM SIZE CEMENTING RECORD JII�/ PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 9 cu vds Concrete �� 'Ore 13 -3/8" 72# L -80 Surface 2678' Surface 2677' 17 -1/2" 3720 cu ft Permafrost II 4 _e 9 -5/8" 47# L -80 Surface 9189' _Surface 8440' 12 -1/4" 1242 cu ft Class 'G', 133 cu ft PF W 7" 26# L -80 8933' 10040' 8206' 9246' 8 -1/2" 381 cu ft Class 'G' 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each jntgo/al open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2 ", 12.6#, L -80 9033' 8830' / 8113' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED sLANNED JUL 0 3 2012 9670' Set Whipstock 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None RRDMS JUN 26 201 V)i Form 10-407 Revised 12/2009 CONTINUED ON REVERSE ,26•f2.- , / /��Submit Original Only /^ 29. GEOLOGIC MARKERS (List all formations andkers • encountered : 30. • FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes 0 No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 9225' 8473' None Shublik 9259' 8504' Ivishak 9343' 8582' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that th for oing i t ue an c ;;(/rrect to the best of my knowledge. Signed: Joe Lastufk JLr Title: Drilling Technologist Date: (U l2.)// PBU B - 20 182 - 168 312 - 092 Prepared By Name/Number. Joe Lastufka, 564 - 4091 Well Number Permit No. / Approval No. Drilling Engineer: Matt Ross, 564 - 5782 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10 -407 well completion report and 10 -404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 12/2009 Submit Original Only . c.I D• B -20, Well History (Pre Rig Sidetrack) Date Summary NT. TEL, 2 -1/2" SAMPLE BAILER, TAG TT @ 9023' SLM +10' correction 03/26/12 RAN 3.50 CE E correction). BAILER ( ) PACKED WITH FORMATION SAND. DRIFT WITH 20' x 3.70" DUMMY WHIPSTOCK SD @ 9809' MD 04/15/12 INITIAL T /I /O = 2250 / 0 / 0. CURRENTLY RIGGING UP ELINE UNIT & WELLTEC MILLING TOOLS TO MILL XN. 04/16/12 RIH WITH WELLTEC MILLING TOOL. SET DOWN ON XN NIPPLE AT 8980FT. LOG CORRELATION PASS TO CONFIRM DEPTH. SET BACK DOWN ON XN NIPPLE. MILL AND DROP DOWN THROUGH NIPPLE INTERVAL. LOG UP TO CONFIRM THAT NIPPLE HAS BEEN MILLED LAID DOWN EQUIPMENT FOR DAY AND RETURN TONIGHT TO SET WHIPSTOCK. ARRIVAL ON LOCATION ,START RIG UP AND PRESSURE TESTS. 04/17/12 1ST RUN = RIH WITH 4 1/2" X 7" BAKER THRU TBG WHIPSTOCK PULL IN TO POSITION TO SET - MADE MULTIPLE ATTEMPTS TO SET WHIPSTOCK WITHOUT SUCCESS - DECISION MADE TO PULL OUT OF HOLE TO CHECK OUT TOOLS (IT APPEARS IGNITER FAULTY). 2ND RUN = SET 4 1/2" X 7" BAKER THRU TBG WHIPSTOCK (TOP OF WHIPSTOCK AT 9670' - 30deq ROHS) (2 RA PIP TAGS INSTALLED ON WHIPSTOCK @ 9680'). FINAL T /I /0 450/0/0. FINAL VALVE POSITION: SSV,SWAB,WING= CLOSED. MASTER, VALVES TO CASING = OPEN. 05/19/12 T /I /0= 2400/0/0 Conducted PJSM. Opened Master, SSV, & Swab valve, recorded tubing pressure. Shut master,bled to 0 psi. at tree cap. Pass. Opened master, shut SSV, bled to 0 psi. Pass. Opened SSV, shut Swab, bled to 0 psi. Pass. Performed Leak Tight Test on SSV & Swab to remove tree cap. Attached lubricator with TWC, PT'd top side of Swab & SSV 250 /low..3500 /high..pass. Set 4" CIW "H" TWC #259 thru tree w/ 1 -1' ext.. Bled tree to 0 psi. Torqued all flanges to specs.(see log for movement) removed lubricator, c/o tools, attached lubricator, PT'd 250 /Iow..3500 /high..pass. Shell tested against TWC, 250 /low..4700 /high..(max output of pressure supply) Pass.(see TRP folder). PULLED TWC. Installed tree cap, PT'd to 500 psi. pass. Pre Nordic 2. 05/20/12 T /I /0 = SSV, MV /20 /VAC. Temp =SI. WHPs (Pre CTD). No AL, FL, Scaffold, or Well House. MV is LOTO. SV =? WV, SSV,MV = Closed. IA,OA =OTG. (0230 hrs). 05/29/12 T /I /0 = 2390/30/vac. Temp = SI. WHP's (CTD Prep). No AL. Flowline, and wellhouse have been removed. SV, WV, SSV, MV = Closed and LOTO. IA, OA = OTG. NOVP. 21:00 hrs. 05/30/12 T /I /0 = 2380/30NAC. Temp = SI. Bleed IAP & OAP to 0 psi. (Pre CTD). No flowline, AL line or wellhouse. IA FL @ 150' (8 bbls). Bled IAP from 30 psi to 0 psi in 20 min. Monitored for 30 min. IAP increased 1 psi. Note: Master valve was cycled open at start of job, FO removed LOTO. Job complete. Final WHPs = 2380/1NAC. SV, WV = C. SSV, MV = 0. IA & OA = OTG. NOVP. 11:45 Hrs. 05/31/12 T /I /0= 2310/0/0. (Load & kill) Spear into tbg w/ 5 bbls neat meth followed by 275 bbls 1% KCL. Freeze protect tbg w/ 40 bbls diesel. FWHP=0/0/0. Swab & wing closed. SSV, master, IA, & OA open. Page 1 of 1 • • • North America - ALASKA - BP Page 1 Operation Summary Report Common Well Name: B -20 I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/2/2012 End Date: 6/8/2012 X3 -011 WC -C: (2,012,775.00 ) I Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/23/2008 12:00:00AM 'Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: Kelly Bushing / Rotary Table @80.00ft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth 1 Phase Description of Operations (hr) I (ft) � I 6/2/2012 00:00 - 02:00 2.00 MOB P I PRE BEGIN RON EVENT WITH NORDIC 2 CTD RIG AT 00:00 ON 06/02/2012 I CLEAR J-27 LOCATION AND SIGN OFF WWT PERMIT WITH PAD OPERATOR 02:00 - 02:30 0.50 MOB P PRE RIG MOVE PJSM, REVIEW PROCEDURE, COMMUNICATION 02:30 - 06:00 3.50 MOB P , PRE MOVE RIG OFF OF J PAD AND DOWN SPINE ' TOWARD B PAD 06:00 - 06:30 0.50 MOB P PRE STOP ON B PAD ACCESS RD ABOUT 1 MILE FROM B-20 FOR SHIFT CHANGE. I CONDUCT SHIFT CHANGE AND RIG WALK AROUNDS. 06:30 - 09:30 3.00 MOB P PRE I CONTINUE ON TO B PAD. STAGE RIG ON 'THE SIDE OF THE PAD AND PUT HERCULITE AND RIG MATS DOWN AROUND B-20 WELL. 09:30 - 10:00 0.50 MOB P PRE PJSM FOR MOVING OVER WELL WITH RIG CREW, NORDIC SUPT, NORDIC TOOLPUSHER AND WSL. ' I DISCUSS SPOTTER LOCATIONS AND DUTIES. — l 10:00 - 10:30 DISCUSS USE OF THE E -STOP SYSTEM. 0.50 MOB P PRE I MOVE RIG OVER WELL AND SET RIG DOWN. ACCEPT RIG AT 10:00. 10:30 - 12:00 1.50 MOB P PRE RIG UP. PREP TO REMOVE TREE CAP. ,12:00 - 16:00 4.00 MOB P l PRE I TEST SWAB VALVE PRIOR TO REMOVING TREE CAP. / , DIFFICULT TO GET A GOOD HIGH PT. TRY CYCLING BOTH SWAB AND SSV, NO LUCK. ' GREASE CREW COMES OUT TO GREASE 609 9 I THE SWAB AND SSV. TEST IS GOOD. 16:00 20:00 4.00 BOPSUR P r PRE REMOVE SWAB CAP AND RIG UP BOPS AND TEST SHELL 20:00 00:00 4.00 BOPSUR l P PRE PJSM AND TEST BOPE TO 250# / 3500# - TEST I HIGH PRESSURE SCREENS IN THE REEL HOUSE TO 350# / 3800# - FUNCTION TEST BOP CONTROLS FROM BOTH REMOTE ■ PANELS - ALL TESTS PASSED 6/3/2012 00:00 - 01:00 1.00 BOPSUR P PRE I CONTINUE BOP TEST. TEST INNER REEL VALVE AND CT STRIPPER. 01:00 - 01:30 0.50 BOPSUR P PRE ' RIG EVAC DRILL. � 01:30 - 03:15 1.75 BOPSUR P PRE PJSM THEN PUMP SLACK BACKWARDS AND CUT 280' CT OFF TO FIND IT. 03:15 - 05:00 1.75 BOPSUR P PRE INSTALL CT CONNECTOR. PULL TEST TO 30K. GET ON WELL AND PUMP WIRE — I. FORWARD. I � 05:00 - 06:00 1.00 BOPSUR P PRE MAKE UP UQC, PRESSURE TEST CT CONNECTOR AND UQC. 06:00 - 07:00 1.00 BOPSUR P PRE INSTALL CHECK VALVES IN UPPER QUICK I CONNECT. M/U CT RISER TO WELL TO TEST CHECK VALVES. I I PRESSURE TEST CHECK VALVES 300 / 3900 PSI, GOOD. Printed 6/18/2012 11:19:38AM • North America - ALASKA - BP Operation Summary Report Common Well Name: B -20 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/2/2012 I End Date: 6/8/2012 1 X3 -011 WC-C: (2,012,775.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/23/2008 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: Kelly Bushing / Rotary Table @80.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth Phase 1 Description of Operations (hr) y (ft) 07:00 - 08:00 1.00 RIGU P PRE PJSM FOR PULLING TWC. LOAD BPV LUBRICATOR TO RIG FLOOR, MAKE UP STEM EXTENSIONS. VERIFY MEASUREMENTS TO SWAB VALVE. WILL USE SWAB AND MASTER VALVE AS BARRIERS. INSTALL LUBRICATOR. PRESSURE TEST 280 / 3750 PSI AGAINST CLOSED SWAB AND MASTER VALVE. GOOD TEST. 08:00 - 09:30 1.50 I RIGU P PRE PULL TWC UP ABOVE SWAB VALVE. 250 PSI ON WELL. I CLOSE MASTER VALVE AND BLEED OFF , PRESSURE. CLOSE SWAB TO RE- ESTABLISH 2 BARRIERS. CONDUCT AAR AND DOCUMENT LESSONS LEARNED. 09:30 - 09:40 0.17 RIGU r P PRE I OFFLOAD BPV LUBRICATOR AND PULLING ROD EXTENSIONS. 09:40 - 10:00 0.33 RIGU P PRE 1 RIG EVACUATION EXERCISE. EVERYONE ON RIG CREW MUSTERS ALONG WITH TRUCK DRIVER AND NEARBY CAMERON CREW. ACCURATE HEADCOUNT, ALL PERSONS ACCOUNTED FOR IN 3 MIN. CONDUCT AAR. 10:00 - 10:40 0.67 RIGU P PRE INSTALL NIGHT CAP AND PT TO 300 / 3500 PSI, GOOD. 10:40 - 11:20 0.67 RIGU P PRE PJSM FOR BULLHEADING THE WELL. I LINE UP TO BULLHEAD AS PER WELL PROGRAM. PUT 360 PSI WHP AND OPEN UP MASTER _ l I AND SWAB VALVE. _ 11:20 - 12:20 1.00 RIGU P PRE I INITIAL WHP IS 280 PSI. PUMP 5 BBLS MEOH. PUMP 92 BBLS 1% KCL AT 4.5 BPM USING BOTH PUMPS. INITIAL WHP IS 280 PSI RISING SLOWLY PAST 700 PSI AFTER 20 BBLS AWAY. 50 BBLS AWAY, WHP FAIRLY STABLE AT 1350 PSI, 4.5 BPM. 92 BBLS AWAY, SWAP TO MUD. MAINTAIN 4.5 BPM, WHP 1465 PSI STARTING TO DECREASE SLOWLY. 90 BBLS MUD AWAY, WHP IS STEADY AT _ 1240 PSI, 4.6 BPM. 12:20 - 12:35 0.25 RIGU P PRE 170 BBLS MUD AWAY. SHUT DOWN PUMPS. FINAL WHP WHILE PUMPING IS 1250 PSI. PRESSURE RISING SLOWLY AT THE END, 1 MUD AT THE PERFS. ; BLEED OFF PRESSURE, 1.8 BBLS OF FLUID. 12:35 - 13:05 0.50 RIGU P PRE I PRESSURE BLED OFF, START FLOW CHECK. 13:05 - 13:35 0.50 RIGU P PRE NO FLOW AFTER 30 MIN. FILL WELL WITH 4 BBLS ACROSS TOP. PJSM FOR M/U BHA #1. ;13:35 - 15:00 1.42 STWHIP 1 P WEXIT FILL WELL WITH 2.7 BBLS THEN M/U BHA #1 - WINDOW MILL. MILL IS 3.80 GO, 3.79 NO -GO. NORDIC CREW CHANGE WHILE M/U BHA. M/U CT RISER. PRESSURE TEST QTS CONNECTION, GOOD. Printed 6/18/2012 11:19:38AM North America - ALASKA - BP 1 Page 3 04, Operation Summary Report Common Well Name: B -20 I AFE No Event Type: RE- ENTER- ONSHORE (RON) ; Start Date: 6/2/2012 End Date: 6/8/2012 I I X3 -011 WC -C: (2,012,775.00 ) Project: Prudhoe Bay t Site: PB B Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 9/23/2008 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UWI: Active Datum: Kelly Bushing / Rotary Table @80.00ft (above Mean Sea Level) Date l From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) �� (ft) 15:00 W P 17:00 2.00 STHIP WEXIT RIH, BHA #1. STOP AT 250 FT AND LOAD PITS WITH 50 MORE BBLS. WELL IS TAKING 6 -10 BBUHR. 1 17:00 - 18:30 1.50 STWHIP P WEXIT TIE -IN DEPTH FROM 9290 FT. - CORR= + 2.5' - UP WT CHECK = 42K, RIH WT = 23K - RIH TO 9665 OBTAIN SLOW PUMP RATES AT 9550' PUMP 1: 2.6 BPM = 2290#, 1.0 BPM = 1183 #, 10.5 BPM = 850# PUMP 2: 2.6 BPM = 2278#, 1.0 BPM = 1176 #, 0.5 BPM = 835# 18:30 21:50 3.33 STWHIP N DPRB 9,665.00 WEXIT 1 GAS MONITOR AT SHAKER ALARMED AND 1 REGISTERING 16 PPM - MM OUT RATE VERY ERRATIC FROM 1.3 TO 5.5 BPM - CLOSE BAKER CHOKE AND REGISTERED 20 PSI - FLUSH MM AND NOTIFY NS SUPT - RU AND CIRCULATE GAS CUT MUD THROUGH MUD I' GAS SEPARATOR AT 1 BPM X 1240 PSI HOLDING 100 BACK PRESSURE ON WELL - CIRCULATE BU - FLOW CHECK WELL - WELL DEAD 21:50 - 22:40 0.83 STWHIP N DPRB 9,665.00 WEXIT !FLUSH MGS WITH FRESH WATER 22:40 - 22:50 0.17 STWHIP P WEXIT I RIH FROM 9665' - TAG WHIPSTOCK AT 9673.2' S- 22:50 - 00:00 1.17 STWHIP P WEXIT START MILLING WINDOW IN 7' CASING W/ � ' 3.79" MILL PER BTT AND WELL PLAN - � A - INITIAL PARAMETERS: FS = 2340, PSI, 80# DHWOB, 450 PSI MW DRILLING PARAMETER DATA SHEET IS - ATTACHED H 6/4/2012 00:00 - 06:00 6.00 STWHIP P WEXIT MILL WINDOW PER BTT AND WELL PLAN - CURRENTLY NO FLUID LOSSES, 1 2.61 IN = 2.61 OUT, FS = 2500 PSI, 2100# WOB, 1160 PSI MW DRILLING PARAMETER DATA SHEET ATTACHED 06:00 09:00 3.00 STWHIP P STWHIP WEXIT IT [ CONTINUE MILLING WINDOW PAST 9680680' ' i 09:00 - 10:00 1.00 P ' WEXIT CONDUCT KICK WHILE DRILLING DRILL HOLD AAR. 10:00 - 11:00 1.00 STWHIP P WEXIT I CONTINUE MILLING RAT HOLE AT 9688' SAMPLE IS 80% FORMATION. 11:00 - 12:00 1.00 j STWHIP P WEXIT 'BACK REAM WINDOW. TRACE OF GAS IN RTNS. FLOW CHECK SHOWS NO FLOW. LINE UP TO GAS BUSTER. CONTINUE TO BACK REAM. ;12:00 - 12:30 0.50 1 , STWHIP P WEXIT DRY DRIFT WINDOW. SMOOTH. 12:30 - 14:30 2.00 STWHIP P WEXIT CIRC OOH THRU MGS. HOLE FILL NORMAL. 14:30 - 15:30 1.00 1 STWHIP P WEXIT PJSM FOR BHA LD. [ LS MOTOR AND MILLS. 15:30 - 17:00 1.50 STWHIP P WEXIT CHANGE OUT SLB RISERS TO CHANGE FLOOR HEIGHT ACCESS. 117:00 - 18:00 1.00 DRILL P PROD1 1 MU BUILD BHA WITH 2.6 DEG XTREME AND HYCALOG BI -CENT WITH CONTROL 1 BUTTONS. STAB COIL. GET ON WELL. TEST QTS. PASSED. Printed 6/18/2012 11:19:38AM • i North America - ALASKA - BP Page 4.? Operation Summary Report Common Well Name: B -20 I AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 6/2/2012 1 1 End Date: 6/8/2012 X3 -011 WC -C: (2,012,775.00 ) ! Project: Prudhoe Bay 1 Site: PB B Pad Rig Name /No.: NORDIC 2 1 Spud Date/Time: 9/23/2008 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: Kelly Bushing / Rotary Table @80.00ft (above Mean Sea Level) Date From - To Hrs Task I Code NPT 1 NPT Depth 1 Phase 1 Description of Operations (ft) L 18:00 - 20:00 2.00 DRILL P I PROD1 1 RUN IN HOLE. LOG TIE IN. ADD 2.5' CORRECTION. 20:00 - 23:00 3.00 DRILL P 1 PROD1 SHAKER GAS DETECTOR SHOWS TRACE GAS. THEN 4% LEL. 1 DISCUSS WITH TOWN. DECIDE TO WEIGHT UP MUDTO9.OPPG 23:00 - 00:00 ' 1.00 DRILL ID PROD1 I DRILL AHEAD WHILE WEIGHTING UP MUD. 6/5/2012 00:00 - 03:00 1 3.00 DRILL 1 P PROD1 CONTINUE DRILLING AHEAD WHILE ' WEIGHTING UP. DRILL TO 9850 FT. 03:00 - 06:45 3.75 DRILL P PROD1 1 LOG LONG TIE -IN FROM 9000 FT. 06:45 - 10:00 3.25 DRILL P PROD1 CONTINUE DRILLING FROM 9850 FT. 111 10:00 - 10:40 0.67 DRILL P ! ! PROD1 DRILL TO TD OF BUILD SECTION AT 9960 FT. PICK UP 5 FT AND PERFORM 5 MIN FLOW CHECK. FLOW CHECK IS GOOD, NO FLOW. CONTINUE WIPER TRIP BACK TO WINDOW. PULL THROUGH WINDOW CLEAN AT 0.5 BPM /30R. PERFORM A JOG ABOVE THE WHIPSTOCK THEN STOP AND OPEN EDC, FLOW CHECK WELL. FLOW CHECK IS G OOD, NO FLOW. 10:40 - 12:15 f 1.58 DRILL P PROD1 1 POOH. PUMP 3.1 BPM WHILE POOH. 12:15 - 13:00 0.75 DRILL PROD1 1STOP AT 50'. FLOW CHECK. HOLD PJSM. 1 GET OFF WELL. UNSTAB COIL. LD BHA TOOLS. 13:00 - 13:45 0.75 DRILL P PROD1 MU LATERAL BHA ( #3) 1.2 DEG AKO WITH XL MOTOR AD HYCALOG BICENTER BIT. INCLUDE RESISTIVITY TOOLS. STAB COIL. TEST TOOLS. GET ON WELL. i - 1 PT QTS. PASSED. 113:45 - 15:45 2.00 DRILL P PROD1 1RUN IN HOLE. PVT:493 BBLS. 115:45 - 16:30 0.75 DRILL P PROD1 I'1 LOG GR TIE IN FROM 9270'. ADD 3' CORRECTION. RUN IN HOLE. 16:30 - 17:30 1.00 DRILL P PROD1 SLIGHT GAS IN RTNS. ROUTE RTNS THROUGH MGS. LOG MAD RESISTIVITY LOG WHILE CIRCULATING. LOG TO 9700' 17:30 - 17:45 0.25 DRILL P PROD1 I RUN IN HOLE TO BTMS AT 9960'. RECORD ! SLOW PUMP RATES ON BOTH M U_ D PUMPS. 17:45 - 20:00 2.25 DRILL P PROD1 I DRILL AHEAD FROM 9960'. 2550 PSI FS AT 2.80 BPM IN/OUT. 200 PSI MTR WORK. DHWOB: 1.62K #. PVT: 545 BBLS. PVT =541, IA =6, OA = -2, WHP =51 20:00 - 21:00 1.00 DRILL P PROD1 I WIPER TO WINDOW FROM 10150' 1 21:00 - 22:30 1.50 DRILL P ' PROD1 I DRILL AHEAD FROM 10150' 2440 PSI FS AT 2.5 BPM IN/OUT 22:30 23:20 0.83 DRILL P i PROD1 WIPER TO WINDOW FROM 10300' 23:20 00:00 0.67 DRILL P PROD1 DRILL AHEAD FROM 10300' 12430 PSI FS AT 2.5 BPM IN / OUT PVT = 533, WHP = 44, IA = 7, OA = -2 6/6/2012 100:00 - 01:30 1 1.50 DRILL P C PROD1 !DRILL AHEAD FROM 10344 Printed 6/18/2012 11:19:38AM TREE • 4- 1116 CIW • 20A WELLHEAD = MCEVOY - SAF NOTES: WELL ANGEL> TO° 9890' " "" ACTUATOR = BAKER CI 4 -1/2" CHROME TUBING *" KB. ELEV = 80.03'1 PJC DRAFT BF. ELEV = 44.53'1 1 KOP = 31001 Max Angle = 95° @ 102021 [20" CONDUCTOR I—I ? 2022' I— I4 -1/2" HES X NIP, ID = 3.813" I Nib D = 9658'! I Datum ND = 8800 SS 2610' 1—I9 -518`• DV COLLAR GAS LIFT MANDRELS 13 - 318" CSG, 72 0, L BUTT, ID = 12.347" ® 2678' MD TVD DEV TYPE um LATCH PORT DATE 4 3220 3216 11 MMG DOM: RK 16 06118/12 IF 3 5853 5604 31 MMG SO RK 20 06/18/12 2 7556 7019 34 MMG DMY RK 0 12/25/11 1 8718 8013 27 MMG DMY RK 0 12/25/11 8799' 1 - 4 - /2" HES X NIP, ID= 3.813" 1 Minimum ID = 2.370" @ 10287' ' 3- 3/16" X 2 -7/8" LINER X© 8830' — 5/8" x 4 -1/2" BKR S -3 PKR, ID = 3.875" 8865' 1-- 4-1/2" HES X NIP, ID = 3.813" 8923' 1 — {3.70" BKR DEPLOY SLV, ID = 3.00" I TOP OF 7" LNR H 8933 ' fa R 1 si 8933' --I9 5/8" X 7" LNR TOP HGR, ID = ? I • 895 _J3.112" HES X NIP, ID = 2.813" i `I. 1 8980' - 4.1/2" HES XN NIP, MILLED TO 3.80" (4/16/12) 1 ` I. 3 -1/2" LNR, 9.2#, L -80 STL, .0087 bpf, ID = 2.992 —, 8987' #r ' 8987' —3 -112° x 3-3/16" J. ID = 2.786 ,i. 4 TBG,12.60, 13CR -80 VAM TOP, — 9033' ► . {' 9033' 14 -1/2" WLEG = 3.958" 1 0152 bpf, ID = 3.958" 4.1" ! "' 1 'I ' I II, =9 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" I 9190' ► ► 4111. kV O w Idi 9581' HT MARKER JOINT I 4 -1/2" X 7" WHIPSTOCK (TAGGED 06/02112) —1 9668' ONO dr 40 7" LNR, 261, L-80 BUTT, .0383 bpf, ID = 6,276" !—: -9668 §F% ' l ot % MILLOUT WINDOW (B -20A) 9668' - 9675' 3 LNR, 6.6#, L - 80 TC11, .0079 bpf, ID = 2.850 — I 10287' ■ 1 10287' — {3 - 3/16" x2 XO, ID = 2.377" PERFORATION SUMMARY REF LOG: MEM CCL/GRiTNF /TNN ON 06/20/12 7' ANGLE AT TOP PERF: 91° @ 11380' — I Note: Refer to Production DB__for historical perf data SIZE SPF I INTERVAL Opn /Sqz DATE 2" 6 11380 - 11470 0 06/10/12 I 2" 6 11525 - 11650 0 06/10/12 _ 1 PBTD —1 11668' I Pt 2.718" LNR, 6.40, L -80 STL, .0058 bpf, ID = 2.441 —{ 11708' ; I DATE REV BY COMMENTS I DATE REV BY COMMENTS PRUDHOE BAY UNIT 11126182 AUDI 12 INITIAL COMPLETION WELL: B -20A 10101108 D16 RWO PERMIT No: '120260 06/12/12 NORDIC 2 CTD SIDETRACK (B - 20A) AR No: 50 - 029 - 20842 - 06/16/12 PJC DRLG DRAFT CORRECTIONS SEC 31, T11 N, R14E, 564' FNL & 1895' FEL I 06/20/12 THI - VJMD GLV C/0 (06/18/12) BP Exploration (Alaska) F • • p, j-r, I SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 LT Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -20 Sundry Number: 312 -092 Dear Mr. McMullen : A ` ANED MAR ;_ Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, / Cathy/. Foerster Chair DATED this l 3 day of March, 2012. Encl. 3 [2 2Aed_ • STATE OF ALASKA • �EIVE > ALASKA OIL AND GAS CONSERVATION COMMISSI9N / � APPLICATION FOR SUNDRY APPROVAL MAR 0 5 201 20 AAC 25.280 1. Type of Request: '= :i 3s,` c i ,_ i . i;as C o ns , Jl llll�lISSIDfI i ❑ Abandon IS Plug for Redrill - ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Pro tdf TE 3 e __ - ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ` - ' _._ ... _. ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development ❑ Exploratory 182 - 168 " 3. Address: ❑ Service ❑ Stratigraphic 6. API Number P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50 029 - 20842 - 00 - 00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU B -20 . Spacing Exception Required? ❑ Yes ❑ No 9. Property Designation: 10. Field / Pool(s): ADL 028310- Prudhoe Bay / Prudhoe Bay . 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10047' - 9252' 9920' 9130' None 9886' Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' Surface 2678' 13 -3/8" 2678' 2677' 4930 2670 Intermediate 9189' 9 -5/8" 9189' 8440' 6870 4760 Production Liner 1107' 7" 8933' - 10040' 8206' - 9246' 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9800' - 9838' 9015' - 9052' 4 -1/2" 12.6# 13CR80 9033' Packers and SSSV Type: 9 -5/8" x 4-1/2" Baker S -3 Packer Packers and SSSV 8830' / 8113' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal BOP Sketch ❑Detailed Operations Program ❑ Exploratory - IN Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: April 2, 2012 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG - ® Suspended 17. I hereby certify that the forego' • g is true a d correct to the best of my knowledge. Contact Matt Ross, 564 -5782 Printed Name Jfd n = f Title Engineering Team Leader / Prepared By Name /Number: Signature Phone 564 - 4711 Date 3( z Joe Lastufka, 564 -4091 ' Commission Use Only Conditio approval: Nyify Commission so that a representative may witness �� � �($ `7 Sundry Number: l . ❑ Plu. ntegrity BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance 3soc. P si. 1 f 7 1--- Other: d / /-e ✓n. el Q l /ems " /¢ ZS ��Z� �'� Subsequent Form Required: /0-Li 0 7- C / APPROVED BY Approved By: r t,_ COMMISSIONER THE COMMISSION Date /3- Z- LLJJ Form 1(1iBViSQ,1. � t �� Submit In Duplicate MM 'MH�t(( ��� ORIGENAL 0/1"----- • • To: Alaska Oil & Gas Conservation Commission From: Matthew Ross by CTD Engineer Date: March 2, 2012 Re: B -20 Sundry Approval Sundry approval is requested to plug the B -20 perforations as part of drilling the B -20A coiled tubing sidetrack. History of B -20. Well B -20 was a rotary well drilled in November 1982 as a Zn2B well. A cement bond log run March 1986 indicated no cement from the Sag to Z3 and poor cement from Z3 to TD. To shut -off gas, in the course of 11 years, 4 cement squeeze jobs were unsuccessfully performed. After 2 failed patch attempts, a RWO was completed in October 2008 which restored integrity with new tubing. The most recent calliper from 12/20/11 showed the tubing to be in good condition with no b' significant wall penetrations. All sidetrack screening pressure tests passed. Reason for sidetrack. B -20 is no longer a competitive well due to low productivity and has no remaining wellwork options. The proposed sidetrack will access a target in the Zn2A. Proposed plan for B -20A is to sidetrack with the SLB /Nordic 2 Coiled Tubing Drilling rig on or around April 25 2012. The existing perforations will be isolated by the primary cement job for the liner. The sidetrack, B -20A, will exit the existing 7" liner and kick off in Zn2C and land in Zn2A. This sidetrack will be completed with a 3 -1/4" x 2 -7/8" liner in the production interval. The following describes the work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. v2 /l p(o`lvcy 01/ q 6 J 1 i 4'5gaa f Cohcv : // an of 54104,/ �/I o of ve," f L/� 19 -�� rw let 1v / ire Cv,ip / k-9 // k' 5 4'�iO7 ' 7 /P?" f c yC/er 1 41 forT o1 - pie /1)0/ S /O ,�A' /t recd Td yy • • Pre -Rig Work: (scheduled to begin April 2 2012) 1. F MIT- IA to 3,000 psi, MIT -OA to 2,000 psi). Passed 12/25/11 2. W Cycle LDS; PPPOT- T to 5,000 psi. Passed 12/27/11 3. S Drift tubing down to TD with 3.625" centralizer. Done 12/20/11 4. E Mill XN profile at 8980' MD to 3.80 ". 5. E Set 4 -W x 7" whipstock at 9,675' MD. 6. V PT MV, SV, WV. Bleed wellhead pressures down to zero. 7. 0 Bleed production flow and GL lines down to zero and blind flange. 8. 0 Remove wellhouse, level pad. 9. V Set TWC (4- 1/16" `H' profile) 24 hrs prior to rig arrival. Rig Work: (scheduled to begin April 25 2012) �. 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" window at 9,675' and 10' of rathole in Zn2C, swap the well to Geo -Vis. 3. Drill Build: 4.125" OH, 325' (28° /100 planned). 4. Drill Lateral: 4.125" OH, 1,933' (12° /100 planned) with resistivity. 5. Run 3 -1/4" by 2 -7/8" L -80 liner leaving TOL at 8,925' MD. (44 6. Pump primary cement leaving TOC at 9,500' MD, 30 bbls of 15.8 ppg liner cmt planned. D 7. Cleanout liner and run MCNL /GR /CCL log. 8. Test liner lap to 2,400 psi. o,_ 9. Perforate liner per asset instructions (- 200'). 10. If needed, set 4 -W liner top packer, and test to 2,400 psi. 11. Freeze protect well, set BPV, RDMO. Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Generic GLV's. Matthew Ross CTD Engineer 564 -5782 CC: Well File Sondra Stewman/Terrie Hubble MOW , TREE _ CM/ , I WELLHEAD = MCEVOY B -2 0 SAFETY NOTES: ***4-1/2" CHROME TUBING*** ACTUATOR = BAKER C KB. ELEV = 80.03' BF. ELEV = 44.53' KOP= 3100' Max Angle = 35°4 6400' I 2022' I4 -1/2" HES X NIP, ID = 3.813" Datum MD '.= 9658' , Datum TVD = 8800' SS 2610' 9 -5/8" DV PKR 113-3/8" CSG, 72 #, L -80, ID = 12.347" 1-1 2678' 11 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE C 4 3220 3216 11 MMG DOME RK 16 11/29/08 3 5853 5604 31 MMG DOME RK 16 11/29/08 Minimum ID = 3.725" @ 8980' 2 7556 7019 34 MMG DOME RK 16 11/29/08 ( 4 -1/2" XN NIPPLE I 1 8718 8013 27 MMG SO RK 20 11/29/08 8799' H4-1/2" HES X NIP, ID = 3.813" I R I 8830' H9 5/8" x 4-1/2" BKR S -3 PKR, ID = 3.875" ' ' I 8865' 1-14-1/2" HES X NIP, ID = 3.813" I TOP OF 7" LNR I-I 8933" I 8933' H 9 5/8" X 7" LNR TOP HGR ID = ? 1 4 -1/2" TBG,12.6 #, 13CR -80 VAM TOP, 9033' 1 1 I I 8980' H4 -1/2" HES XN NIP, ID = 3.725" I .0152 bpf, ID = 3.958" / \ 9033' 14-1/2" WLEG = 3.958" I I9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 9190' I 1 9581' 1-17" MARKER JOINT I PERFORATION SUMMARY REF LOG: DA -BHCA, 11/21/82 ANGLE AT TOP PE:RF: 17° @ 9800' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8" 4 9696 - 9748 S 08/15/98 3 -3/8" 4 9748 - 9758 S 08/15/98 3 -3/8" 6 9752 - 9758 S 12/13/99 2 -7/8" 4 9770 - 9790 S 08/15/98 2 -7/8" 4 9800 - 9818 0 08/15/98 3 -3/8" 4 9825 - 9838 0 12/13/99 I 1 PBTD H 9865' 1 ■ * ' , 9886' -I FISH - CAM SPINNER SHIELD IN HOLE, 06/04/92 I r. ,,w1,' 11 I7" LNR, 26 #, L -80, .0383 bpf, ID = 6.276" 1-1 10040' 1 0A.A.A.A.A.A.■ DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/26/82 ORIGINAL COMPLETION WELL: B -20 10/01 /08 016 RWO PERMIT No: 1 821680 10/12/08 JLJ /PJC GLV C/0 (10/04/08) API No: 50- 029 - 20842 -00 11/21/08 MD /JMD DRLG DRAFT CORRECTIONS SEC 31, T11N, R14E, 564' FNL & 1895' FEL 12/12/08 MBM/SV GLV C/O (11/29/08) BP Exploration (Alaska) TREE= CM/ ' � • V1/ELLHEAD= MCEVOY 2 0 A SAFETY NOTES: * * *4 -1/2" CHROME TUBING * ** ACTUATOR= BAKER CJ proposed CTD sidetrack KB. ELEV = 80.03' BF. ELEV = 44.53' KOP = 3100' Max Angle = __35" 6400' ' I I 2022' H41 /2" HES X NIP, ID = 3.813" I Datum MD = 9658' Datum TVD = 8800' SS 2610' 9 -5/8" DV PKR 113 -3/8" CSG, 72#, L -80, ID = 12.347" H 2678' I , , GAS LIFT MANDRELS ST MD 1''D DEV TYPE VLV LATCH PORT DATE 4 3220 3216 11 MMG DMY RK 0 12/25/11 3 5853 5604 31 WIG DMY RK 0 12/25/11 Minimum ID = 2.377" 10300' 2 7556 7019 34 MMG DMY RK 0 12/25/11 3- 3/16" x 2-7/8" XO 1 8718 8013 27 MMG DMY RK 0 12/25/11 I 8799' H4 -1/2" HES X NN', ID= 3.813" TSGR = 9,226' MD X X 8830' I-I9 5/8" x 41/2" BKR S -3 PKR, ID = 3.875" I I 8865' H4-1/2" HES X NF, ID = 3.813" I Top of 3 -1/2" liner @ - 8,925' TOP OF 7" LNR H 8933' } 8933' H X 7" LNR TOP HGR, ID = 7 I H4 -1/2" HES XN NIP, ID = 3.800" I milled out 4-1/2" TBG,12.6#, 13CR -80 VAM TOP, 9033' .0152 bpf, ID = 3.958" 1-1 Nipple 19 -5/8" CSG, 47 #, L -80, ID = 8.681" I-1 9190' I 9033' H41 /2" WLEG = 3.958" I I 9581' I—{ 7" MARKER JOINT 1 -- - - -- 3 -1/2" x 3- 3/16" XO —Top of cement at - 9,500' PERFORATION SUMMARY 18 REF LOG: DA -BHCA, 11/21/82 ANGLE AT TOP PERF: 17° @ 9800' TD @ 11,933' Note: Refer to Production DB for historical perf data 3- 3/16" x 2 -7/8" XO @ -10,300' SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8" 4 9696 - 9748 S 08/15/98 3 -3/8" 4 9748 - 9758 S 08/15/98 3 -3/8" 6 9752 - 9758 S 12/13/99 2 -7/8" 4 9770 - 9790 S 08/15/98 2 -7/8" 4 9800 - 9818 0 08/15/98 3 -3/8" 4 9825 - 9838 O 12/13/99 I I 4 142" x 7" TT u "task 3,675' I I PBTD H 9865' I At; % 1.141 • 4a 1 9886' 11 FISH - CAM SPINNER SHIELD IN HOLE, 06/04/92 I 17" LNR, 26 #. L -80, .0383 bpf, ID = 6.276" I-1 10040' ttttttt� DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/26/82 ORIGINAL COMPLETION 02/02/12 +r. JH proposed coil sidetrack WELL: B -20A 10/01/08 D16 RWO PERMIT No: 1821680 10/12/08 JLJ /PJC GLV C/O (10/04/08) API No: 50- 029 - 20842 -00 11/21/08 MD/JMD DRLG DRAFT CORRECTIONS SEC 31, T11 N, RI 4E, 564' FNL & 1895' FEL 12/12/08 MBM/SV GLV CIO (11/29/08) 01/07/12 RCT/ PJC GLV C/O (12/25/1) BP Exploration (Alaska) NORDIC CTD RIG# 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM - , . Cho e Pine! Standpipe 2" Circulation Line - . MM 11 L<"!J +rte.... Driller Gauge , M , M 10 �•. 1 Manual Choke CIRCULATING MANIFOLD — .M. ; M ; MM20 r4 .4,, MM 22 111111 SLB Transducer MM 6 .krle i . , PVT Sensor ® _ 7 -1116" 5kpsi BOPE Air Blow down - - n� MM7 �. Blind Shears Line ': MC_ _ Baker Choke ��• MM 21 MM 5 AS BUSTS; . � 2 -318" Combi .• • s s e Kill Line TOT PIS ." Rev Cir Line MM74 __ 1 11 • � • .e:: ae v s a s ro „ a. Sc � .. �„ ,emu i. — • H I- es . ' c t'∎.''P„,4'. -" kink t p till BOP 24 • i,i ii Coiled Tubing — - 2-3/8" - 3-112" :' �. a�111klkl�llk awiwrii. — fi V8R ram _ Ba er Choke 2 -3/8" Combi `�. MP1 in • . ♦ TOT MM1.e . MM 13 II - d' Kill Line Outlet Cement Line to Ground Mud '2 in V —* Pu'..s In ,... Tranducers COILED TUBING i ' Choke Line CIRCULATING SYSTEM Cellar • Area ' 1111.11111111M 40 •.,, HP 14 3 . . To Inner Reel Outlets .. ,,• Valve HP 0 HP7 HP3 _I� if ; rr 1 HP2 HP1 • 4 HP1! 4 4 41111111.111nt cement line N2 ( SLB NORDICS 2 Circulate Manifold • MO CHOKE MANIFOLD in Cellar HP 11 N2 TriFlow �/ CM 85 � - r -�7}, Gauge 0 l Ef IIA s -I - r ur I Test Pump Inlet — l''''',j CM3 ] � j' HDI Gauge CM18 - _!_� Flow fl HC c = E • 4Way Block � — To PITS • • CM14 CM1 CM8 cii ME C, 2 C C Co 1 Baker Choke Line i n I Baker Choke Line from wal HCR 3 BAKER CHOKE LINE CM13 = ' CM7 _ — Mi raker Choke Line CM2 1 :: CM 26 CM 29 CM20 CM4 — eavrinmrReru _ _ _ CM 30 CHOKF I INF z w. CM 75 CM10 Tiger Tank CM 25 a Outside O h o7/27n o • Schlu~her~r Alaska Data & Consulting Services 2525 Gambeil Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # NO.5567 Company: State of Alaska Alaska Oil & Gas Cons Comm Ann: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD P2-16 BB6M-00027. LDL - 1 07/20/10 1 1 F-03A AYKP-00096 SCMT ~ ! 07/22/10 1 1 V-225 S-100 BBKA-00039 BCZ2-00014 USR _ USIT 07/01/10 07/14/10 1 1 1 1 2-58/5-09 BCZ2-00016 LDL 07/17/10 1 1 1-15/P-25 W-19A 01-228 AYKP-00094 BCR0.00036 AZ2F-00042 LDL - USIT MCNL 07/11/10 07!25/10 05/19/10 1 1 1 1 1 1 B-20 AYtM-00042 RST ~ 05/07/10 1 1 04-20 BCRJ-00020 RST 05/30/10 1 i 8.18 05-32A H-25 AYKP-00082 B8K5-00040 BCRD-00017 RST RST _ RST 06/02/10 05/19/10 05/10/10 1 1 1 1 1 i P2-34 AVYO-00063 RST - 04/17/10 1 t PLEACF ACKNtlWI Fnr:F ucr eror ev mr_.uu n_ w.,n seT„nu.ur ...~~ ........ ~.,... ~... BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Sutle 400 Anchorage, AK 99503-2838 ~~~W~ ~~ut. ~ ~> 2a1n r ~ mi 1(~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 11, 2009 +'~~~~~'' ~~ ~' i~ ~~ ``~ ~ ~" Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Pad B Dear Mr. Maunder, ~.,~ .,~ <. _~,; ~ . ~,~~rz,;~s~-.. ~.~- ~` g~~ d bS ~-ao Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad B that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Dates 12/11/09 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al B-01 1700080 50029200590000 Sealed Conductor NA NA NA NA NA B-02 1961110 50029200660100 Sealed Conductor NA NA NA NA NA B-03A 1870480 50029203060100 NA 0.5 NA 3.40 8/20/2009 B-04 1700320 50029200720000 Sealed Conductor NA NA NA NA NA B-O5B 2010680 50029202760200 NA 1.8 NA 13.60 8/22/2009 B-O6 1770740 50029202790000 NA 1 NA 5.10 8/20/2009 B-07 1780020 50029202850000 NA 1 NA 5.10 8/20/2009 B-08 1780410 50029203140000 NA 1 NA 6.80 8/20/2009 B-09 1780490 50029203160000 NA 0.5 NA 3.40 8/20/2009 B-10A 2082050 50029203210100 Cellar liner welded to casin NA NA NA NA NA B-11 1780690 50029203310000 NA 0.5 NA 3.40 8/20/2009 B-12 1970090 50029203320100 NA 0.6 NA 3.40 8/22/2009 B-13 1990570 50029203410100 NA 0.4 NA 1.70 8/20/2009 B-14 2090590 50029203490000 NA 0.4 NA 1.70 8/20/2009 B-15 1790190 50029203600000 NA 0.1 NA 1.70 8/20/2009 B-16 1790250 50029203650000 NA 0.8 NA 5.10 8/21/2009 B-17 1790280 50029203680000 NA 0.1 NA 1.70 8/20/2009 B-18 1820020 50029207020000 NA 1.5 NA 15.30 8/21/2009 B-19 2001610 50029207030100 NA 0.1 NA 1.70 8/21/2009 B-20 1821680 50029208420000 NA 0.5 NA 3.40 8/21/2009 8-21 1821760 50029208500000 25 4.5 BBLs 0.1 11/30/2009 1.70 12/3/2009 B-22A 2001570 50029207590100 34 6.5 BBLs 0.2 11/30/2009 1.70 12/3/2009 B-23 1970590 50029207790100 12 2.2 BBLs 3.2 11/30/2009 10.20 12/4/2009 8-24 1821400 50029208150000 NA 3 NA 22.10 8/21/2009 B-25 1821510 50029208260000 NA 0.25 NA 1.70 8/13/2009 B-26 2000570 50029209760200 NA 0.3 NA 1.70 8/21/2009 B-27 1961010 50029214710100 Sealed Conductor NA NA NA NA NA B-28 1853030 50029215100000 NA 1.1 NA 6.80 8/22/2009 B-29 2002090 50029215230100 NA 0.7 NA 6.80 8/21/2009 B-30 2011050 50029215420100 NA 0.2 NA 1.70 8/21/2009 B-31 1910460 50029221520000 NA 0.3 NA 1.70 8/20/2009 B-32 1991180 50029221650100 NA 0.3 NA 1.70 8/20/2009 B-33 1931450 50029223390100 NA 1.2 NA 8.50 8/21/2009 6-34 1930370 50029223520000 NA 1.2 NA 1020 8/21/2009 B-35 1931460 50029224060000 NA 0.3 NA 1.70 8/20/2009 B-36 1960650 50029226670000 NA 0.3 NA 1.70 8/21/2009 B-37 2071450 50029233750000 Sealed Conductor NA NA NA NA NA STATE OF ALASKA /~^~ j'' A~ OIL AND GAS CONSERVATION CO~SION ~~~/ REPORT OF SUNDRY WELL OPERATIONS ~Cr ~ ~ ZQ08 1. Operations Performed: ~~85~68 (~€~ ~~ L~:~IiS. a.JFTl~~B ^ Abandon ®Repair Well . ^ Plug Perforations ^ Stimulate ^ Re-En p~ed Well ^ Alter Casing ®Pull Tubing - ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development- ^ Exploratory 182-168' 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20842-00-00 7. KB Elevation (ft): 80 0' ~ 9. Well Name and Number: B-20 - 8. Property Designation: 10. Field /Pool(s): ADL 028310 , Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 10047 - feet true vertical 9252 - feet Plugs (measured) None Effective depth: measured 9865 feet Junk (measured) 9886' true vertical 9078 feet Casing Length Size MD ND Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2678' 13-3/8" 2678' 2677' 4930 2670 Intermediate Production 9189' 9-5/8" 9189' 8440' 6870 4760 Liner 1107' 7" 8933' - 10040' 8206' - 9246' 7240 5410 Perforation Depth MD (ft): 9800' - 9838' Perforation Depth TVD (ft): 9015' - 9052' 4-1/2", 12.6# L-80 9033' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" X 4-1/2" Baker S-3 Packer 8830' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: ,-~;:: r(' 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ~ Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil~ ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Mackie Derrick, 564-5891 p~/q Printed Name Sondra Stewman Title Drilling Technologist i C Prepared By Name/Number. ~~ ~'~ 'Q Si ature Phone 564-4750 Date o a Sondra Stewman 564-4750 0 Form 10-404 Revised 04/2006 ,, ~' `: ' ~ ~ ~ ~ Submit Original Only ~1~~~ TREE =~ 4" Can~ron D R~G DRAFT h ~~~ S OTES: WELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV - 80.03' BF. ELEV - 44.53' KOP = 3100' Max Angle = 35 @ 6400' Datum MD = 9658' Datu m N D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" fill !1 _ ®` ~ ~L~ 2022' I--14-1;'2" X NIPPLE: iD = 3.813° GAS LIE=( MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3220 3216 11 MMG DOME RK 16 10104108 3 5853 5604 31 !41(llIG SO RK 20 10i04I0H 2 7556 7019 34 k~1MG DMY RK 0 10101;08 1 8718 8013 27 M(v1G DMY RK 0 10101108 $799' --~4-1(2" x NIPPLE, ID = 3.813" $839' 9 518" x 4-112° BAKER S-3 PKR $8$~' 1 4-112" X NIPPLE, [D = 3.813" TOP OF 7" LNR 89$0' ~ 4-112" XN NIPPLE, 1D = 3.725" 4-112" TBG,12.6#. L-80, .0152 Eapf; ID = 3.958" 931' 903'1' 4-1(2'" WLEG 9-5/8" CSG, 47#, L-80, ID = 8.681" 9189' PERFORATION SUMMARY REF LOG: DA-BHCA, 11/21/82 A NGLE AT TOP PERF: 17° @ 9800' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 9696 - 9748 S 08/15/98 3-3/8" 4 9748 - 9758 S 08!15/98 3-3/8" 6 9752 - 9758 S 12/13/99 2-7/8" 4 9770 - 9790 S 08/15/98 2-7/8" 4 9800 - 9818 O 08/15/98 3-3/8" 4 9825 - 9838 O 12/13/99 I PBTD 9578' I-(~ RKER JOINT 9886' I~ FISH -CAM SPINNER SHIELD IN HOLE, 06/04/92 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" DATE REV BY COMMENTS DATE REV BY COMMENTS 11/26/82 ORIGINAL COMPLETION 10/01/08 D16 RWO 10/03/08 /TLH CORRECTIONS 10/12/08 JLJ/PJC GLV GO (10/04!08) PRUDHOE BAY UN1T WELL: B-20 PERMIT No: 1821680 API No: 50-029-20842-00 SEC 31, T11N, R14E BP 6cploration (Alaska) Page 1 of 2 • 1lVell: B-20 Well History Well Date Summary B-20 7/19/2008 ***WELL S/I ON ARRIVAL*** RAN BAILER TO TIGHT SPOT ~ 10' SLM..RECOVERED -3/4 GAL OF GREASE EO. WRP C~ 8901' MD.........PULLED 4-1/2" WRP FROM 8901' MD TAGGED 4-1/2" CROSSOV C~ 8856' SLM W/ 5-1/2" WRP DMY DRIFT (4.53" OD, 69" OAL) ***LEFT WELL S/I, NOTIFY PAD-OP**** B-20 7/21/2008 T/I/O = 840/100/10. Temp = SI. T, IA & OA FLs (pre FB). Tbg FL @ 1932' (45 Bbls). IA FL @ 348' (16 Bbls). OA FL near surface. Wellhouse and flowline have been removed. SV & WV =Shut. SSV & MV =Open. IA & OA = OTG. B-20 7/22/2008 ***WELL SHUT IN ON ARRIVAL*** INITIAL T/I/O = 875/125/0 PSI. RIH WITH WEATHERFORD 5.5" WRP ***JOB CONTINUED ON 23-J - B-20 7/23/2008 ***LOG CONTINUED FROM 22-JUL-2008*** CONTINUE RIH WITH WEATHERFORD 5.5" WRP, MAX OD= 4.5". UNABLE TO GET DEEP ENOUGH. TAGGING AT 8848 FT. RIH WITH HEAD/CCUJARS/WEIGHT BAR X2/JUNK BASKET/3.75" GAUGE RING. SETTING DOWN AT 8797 FT. POOH TO RIH WITH PL TS. RIH WITH HEAD/ CCU 2 WEIGHT BARS/ FIRING HEAD/ BAKER 10/ WEATHERFORD 4.5" WRP. SET WRP AT 8856'. I OA OPEN T GAUGES, MASTER OPEN, SWAB SHUT LEAVE LOCATION. ***JOB COMPLETE*** 09/20/08: WF WRP MONTHLY RENTAL FOR 08/23/08 - 09/22/08. MOs 2 (SV) B-20 7/24/2008 T/I/0= 860/140/0+. Temp= SI CMIT-TxIA PASSED to 3500 psi, MIT OA PASSED to 2000 ps} (RWO Prep) Bled gas from Tbg to 280/40/0. RU to IA and pumped 87.8 bbls of 100*F crude down IA to reach test pressure for CMIT TxIA. T/IA lost 40/40 psi 1st 15 min and 0/20 psi 2nd 15 mins for a total loss 60/60 psi in 30 mins. Bled pressures. Pumped 3.1 bbls of 100*F crude down OA to reach test pressure for MITOA. OA lost 150 psi 1st 15 min and 30 psi in 2nd 15 mins for a total loss of 180 psi in 30 mins. Bled pressure back (2 bbls) Final WHP's= 520/240/0+. Annulus casing valves tagged and left open. Swab closed,wing closed,SSV open, Master open, IA open, and OA open F/O verified valve positions. Valve positions written down on permit. B-20 7/28/2008 T/IA/OA= SI/150/0 Temp=cold PPPOT-T-T (PASS) PPPOT-IC (FAIL) (Pre RWO) PPPOT-T RU 1 HP BT onto THA test void, 0 psi. Flushed void until clean returns achieved, pressured to 5000 psi for 30 minute test, 4950/ 15 minutes, 4900/ 30 minutes. Bled void to 0 psi, Cycled all LDS "Standards" ran out 1.5" and ran in and torqued, all were very tight but all functioned with no problems. PPPOT-IC RU 1 HP BT onto IC test void, 0 psi. Flushed void until clean returns achieved, Pressured to 1000 psi and would not hold pressure. Leak path eval on 03/08/07 indicates leak across both seals (FAIL). Cycled all LDS "Standard" ran out 1.5" ran in and torqued. Bled void to 0 psi RD all test equipment B-20 8/11/2008 ***WELL SHUT IN ON ARRIVAL*** DRIFTED W/ 4.0"GAUGE RING TO 4-1/2"XO AT 8,848'MD. DUMP BAILED 2 BAGS OF SLUGGITS (100 LBS) W/ 3.50" DUMP BAILER ON 4-1/2"WRP 8.856'MD. ***RDMO,LEFT WELL SHUT IN AND TURNED OVER TO OPERATOR*** B-20 8/15/2008 ***WELL SHUT-IN ON ARRIVAL*** INITIAL T/I/O = 400/0/0 CUT 5.5" TUBING WITH 4.15" JET POWER CUTTER AT 8825'. GAUGES LEFT AS FOUND: SSV=O, WING=C, MASTER=O, SWAB=C WELL LEFT SHUT-IN. DSO NOTIFIED ***JOB COMPLETE*** B-20 8/21/2008 T/I/0=440/140/40. Circ Out, CMIT TxIA FAILED to 3500 psi, CMIT TxIA PASSED to 1000 psi (RWO Prep) Pumped down Tbg with 5 bbl meth spear, 890 bbls of 9.3# NaCI brine followed by 8 bbls of diesel taking returns up IA to B-30 flowline. U-tubed TxIA. CMIT TxIA FAILED to 3500 psi. (7 attempts) LLR= too small for this pump to measure. Pumped 10 bbls of diesel into the Tbg during OMIT. TxIA lost 320 psi in 1st 15 min and 160 psi in 2nd 15 min. Lost a total of 480 psi during the last 30 minute test. Bled back -2 bbls to 1000 psi. CMIT-TxIA PASSED to 1000 psi. (1st attempt) TxIA held firm for the 30 minute test. Bled back -5 bbls to in~H s = 0 0/0. ***WSR continues on 8/22/08*** '~ Page 2 of 2 6-20 8/22/2008 ***WSR continued from 08/21/08*** Freeze Protect the IA hardline loop with diesel and B-30's flowline with the WOA recipe.(Post Circ-Out) Final WHP = 0/0/0. Annulus casing valves are open to gauges. Verify valve postions with FO at permit closure. B-20 8/29/2008 T/I/0=50/0/0. Set 6" CIW J BPV. Pre-Rig B-20 9/21/2008 T/I/0=bpv/0/0. Bleed I/A to 0 PSI. Pre valve move to opposite side of tbg. head. B-20 9/25/2008 T/I/0=0/0/0. Pull 6" CIW J TWC thru BOPE after test. Doyon 16. B-20 10/2/2008 T/I/O=Vac/0/0. Pull 4" CIW H BPV thru tree, post rig. 1-2' ext used, tagged ~ 102". No problems. B-20 10/2/2008 T/I/O =VAC/0/0 PULLED 4 1/16" CIW H TWC POST TREE TEST. DOYON 16. B-20 10/4/2008 *"WELL SHUT IN ON ARRIVAL (post rig)*** PULL B&R @ 8839' SLM PULLED DMY GLV'S FROM STA# 3, STA# 4 SET LGLV IN STA # 4, @ 3204' SLM,& OGLV IN STA# 3 @ 5838' SLM PULLED RHC PLUG BODY C~ 8842'SLM ***CONTINUED ON WSR 10/5/08*** B-20 10/5/2008 ***CONTINUED FROM WSR 10/4/08*** DRIFT W/3.625 CENT, TEL, 5'x 2.5" DRIVE DOWN BAILER. TAG FILL @ 9761'SLM, 9781' MD CORR. HAVE FILL IN BAILER. HAVE 19' OF FILL ABOVE PERFS. ***LEFT S/I, TURNED WELL OVER TO PAD OP*** Print Date: 10/15/2008 Page 1 of 1 BP AMERICA Page 1 of 6 Operations Summary Report Legal Well Name: B-20 Common Well Name: B-20 Event Name: WORKOVER Start: 9/23/2008 Contractor Name: DOYON DRILLING INC. Rig Release: 10/1/2008 Rig Name: DOYON 16 Rig Number: Date From - To 'Hours Task Code NPT .Phase L 9/24/2008 00:00 - 03:00 3.00 RIGU P PRE 03:00 - 06:00 I 3.00 I RIGU I P 06:00 - 09:30 I 3.501 KILL I P 09:30-12:00 i 2.50JWHSURiP 12:00-14:30 ~ 2.50WHSUR~P 14:30 - 17:30 I 3.001 BOPSUFI P 17:30 - 20:30 I 3.001 BOPSUR N 20:30 - 00:00 I 3.501 BOPSUp P 9/25/2008 100:00 - 03:30 I 3.50 I BOPSU 03:30 - 04:30 I 1.001 BOPSU 04:30 - 06:30 I 2.001 PULL 06:30 - 07:30 I 1.001 PULL 07:30 - 08:00 I 0.501 PULL 08:00 - 18:30 I 10.501 PULL Spud Date: 9/23/2008 End: Description of Operations Prep to rig up. Remove Tioga heatrs from pits. Inspect pits for proper valve alignment. Spot Rig at B-20 Well Slot. Install second valves on IA and OA. Hook up pump and electrical modules. Hook up lines to maniford and Production Tree. Hook up line to Slop Tank. Take on Sea Water in Pits. Accept rig at 0500-hours. Pick up lubricator. PT lubricator to 500-psi, pull BPV; no pressure on PRE DECOMP ECOMP R/U circulating lines and test same to 3500-psi. Circulate out the 9.3-ppg brine and diesel freeze protect, 7.5-BPM at 900-psi at the start. Pump 650-Bbls taking all returns to the Slop Tank. Get 8.5-ppg brine at end of well kill circulation. Monitor well for 30-minutes; pressures 0/0/0. Cameron dry rod in 7" CIW "J" test plug. Test from the top to 3500-psi and from the bottom to 1000-psi, each for 10-minutes, charted for good tests. DECOMP B/D lines and suck out tree. N/D Tree and adaptor flange. Plug control line ports in hanger. DECOMP Function all Lockdown Screws for the 9-5/8" casing spool. N/U BOP stack. Call AOGCC at 1515-hours with 1-hour callout to begin BOP testing. Install drilling riser and turnbuckles. Torque all BOP nuts with Sweeney wrench. Load and strap drillpipe in Pipe Shed. Quadco technician repair/replace pit level monitors that had been painted over. Function test rams and bag in preparation for BOP test. RREP DECOMP Problems with the Koomey Unit. Electrician and Mechanic trouble shooting system. Electrician found a bad pressure transducer and a broken wire. DECOMP Test BOPE 250-psi low, 3,500-psi high; testing 3-1/2" x 6" VBRs with 4" and 5-1/2" test joints. Test the Hydril with only the 4" test joint. Had one leak at BOP stack flange. Had one choke line connection leak. Trouble shoot pressure drop in choke manifold to valve #9. Continue with remainder of test with no further problems. DECOMP Complete BOPE test. Rig down test equipment. Blow down lines and choke manifold. DECOMP Pick up lubricator. Test lubricator at 500 psi. Pull TWCV. Lay down same. DECOMP Monitor IA pressure at 0 psi. Pull Dutch System. Pick up landing joint. BOLDS. PJSM. Pull Hanger at 175K to rig floor with no problems. Set hanger back down to adjust draw-works ra es. on ending joint to pull string free and it pulls free at 205K-Ibs. Pull hanger to floor and R/U to Circulate Bottoms Up, 380-Bbls, 9-BPM at 200-psi. Got returns immediately when pump was started up and saw no gas or oil in the returns. DECOMP Circulate Bottoms Up, 395-Bbls, 9-BPM at 200-psi. Returns immediately upon pump startup, saw no gas or oil during the CBU. DECOMP Monitor well and well dead. R/U to pull tubing. Hold PJSM to L/D hanger, tubing and to spool control lines--with Schlumberger Camco hand, rig crew, toolpusher, and WSL. DECOMP POOH and L/D 5-1/2" tubing throu h Pipe Shed. Tubing is not eina sa vaaed. 30-joints UD at 1025-hours. 45 at 1100-hrs. 95 Printed: 10/16/2008 10:39:23 AM BP AMERICA Operations Summary Report Legal Well Name: B-20 Common Well Name: B-20 Event Name: WORKOVER Contractor Name: DOYON DRILLING INC Rig Name: DOYON 16 Date From - To .Hours j Task Code 9/25/2008 08:00 - 18:30 10.50 PULL 18:30 - 19:30 I 1.001 PULL 19:30 - 20:30 1.00 W HSUB 20:30 - 22:30 I 2.001 WHSUB 22:30 - 23:30 I 1.001 FISH 23:30 - 00:00 0.50 FISH 9/26/2008 00:00 - 07:30 7.50 FISH P 07:30 - 09:00 1.501 FISH ~ P 09:00 - 11:00 I 2.001 FISH I P 11:00 - 14:00 I 3.001 KILL I P 14:00 - 14:30 I 0.501 KILL I P Start: 9/23/2008 Rig Release: 10/1/2008 Rig Number: Page 2 of 6 Spud Date: 9/23/2008 End: NPT Phase Description of Operations DECOMP at 1345-hrs. 135 at 1500-hrs. 175 at 1645-hrs. Finished laying down 5 1/2" completion. Recovered complete. 201 ea 5 1/2" x 17 Ib/ft L-80 Mod Butt Tbg, SSSV, 10 ea GLMs, SS. Tubing was in good shape. Threads OK. 5 1/2" jet cut joint = 17.56'. DECOMP Rig down 5 1/2" handling equipment. Clear and clean floor. Observe fluid level at surface and static. DECOMP Pick up pack-off pulling/running tool on joint of drill pipe. "J" into 9 5/8" pack-off. BOLDS. Pull 9 5/8" Pack-off to rig floor with no problems. DECOMP Install new 9 5/8" pack-off. Lay down landing joint and running tool. R1LDS. Remove blind flange (IA) on tubing spool and install VR Plug. Install threaded flange and tapped bull plug/needle valve. Test 9 5/8" Pack-off at 3,800 psi x 30 minutes. Good test. (install wear bushing = 9 1/8" ID). DECOMP Make up BHA #1 as follows: 5 1/2" spear, XO, Pump Out Sub, XO, Bumper Jar, Oil Jar, XO, 9 ea 6 1/2" Drill Collars, XO, Intensifier, XO. DECOMP Start picking up 4" Drill Pipe from Pipe Shed. DECOMP Continue to single in with 4" Drill Pipe from Pipe Shed (180 Joints at 05:00 hrs). DECOMP P/U jt #268, get parameters: P/U wt 186K, S/O wt 155K, Rot wt 170K, Free Torque 5K-Ib-ft, 2.5-BPM, 240-psi. P/U jt #269, circulate in to top of stump at 2-BPM, 120-psi. Set down on the spear no-go 5K-Ibs at 28.5' in. See -20-psi after rotating in 2-turns to set grapples. P/U to 210K-Ibs to slowly bleed off jars. P/U to check bite, good bite. Start turning into the SBR 13-turns and stall out on torque limit of 13K-Ib-ft. Slowly let off torque, and repeat right hand turns with string, back off torque. P/U to set off jars and repeat. SBR pulls free and S/D to monitor well. DECOMP Monitor well and see fluid level slowly drop. Start pump and bring up to 7-1/2-BPM, 1550psi to circulate bottoms up, -6000-strokes (509-Bbls). See gas to surface at 4200-strokes (356-Bbls). Stop pump to monitor well and fluid level begins to drop, then picks back up and pits gain 2.5-Bbls in 15-minutes. DECOMP Call ADW engineer and leave message that we will be shutting w _ .__ in the well and uttin it throu h the choke manifold and a buster Call AOGCC at 1115-hrs to inform them that we have actuated the Hydril. Discussed Plan Forward with Toolpusher and Driller to use driller's Method to circulate the gas out of the well. Discussed plan with ADW RWO superintendent, with Workover Team Lead, and ADW engineer and receive their "go-ahead". Pressure built to 175-psi in the IA while well was S/I for 30-minutes. Start pump at 2-1/2-BPM, 590-psi, with choke at 150-psi at 1130-hours; fluid wt in/out, 8.5-ppg. 1145-hrs, 3-BPM, 550-psi, 250-psi. 1200-hrs, 4-BPM, 650-psi, 150-psi. 1230-hrs,4-BPM, 590-psi, 100-psi. 1300-hrs, 4-BPM, 550-psi, 140-psi. 1400-hrs, 4-BPM, 550-psi, 120-psi. DECOMP S/I pump and monitor well. No returns through the gas buster after 20-minutes. Open bag and see fluid level dropping, but DP is vibrating so start pump and it takes 5.5-Bbls to fill and brings gas cut fluid to the surface. Call ADW Team Lead and discuss bullheading 1-1/2 wellbore volumes to kill well. Printed: 10/16/2008 10:39:23 AM • BP AMERICA Page 3 of 6 Operations Summary Report Legal Well Name: B-20 Common Well Name: B-20 Spud Date: 9/23/2008 Event Name: WORKOVER Start: 9/23/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/1/2008 Rig Name: DOYON 16 Rig Number: i Date From - To I, Hours Task Code NPT Phase Description of Operations 9/26/2008 14:30 - 17:00 2.50 KILL P DECOMP S/I Hydril and resume circulating through choke manifold and gas buster. Start pumping at 4-BPM at 550-psi. Wait on three truckloads of seawater to add to the 1-truckload that had been waiting in reserve to replace fluid losses. Lost -35-Bbls of 17:00 - 18:00 1.00 KILL P DECOMP PJSM with Vac truck drivers and crew to Bullhead-kill the well with -1000-Bbls of seawater. Break off DP joint, drop ball/rod to open pump out sub. Bring up pump 1 to 4-BPM at 550-psi, see pressure drop to 340-psi when pump out sub opens up. Open IA to Kill Line and pressure builds to 2500-psi after 109-strokes. Stop pump and pressure holds tite. Bleed off and perform same operation. Stop pumping when pressure reaches 2400-psi after 86-strokes. Discuss with Baker fisherman and decide that it was possible that the SBR external seal assembly fell away from the slick stick, which relatched itself into the packer. Bled off pressure through choke immediately with very little gas breakout seen in the annulus. Call ADW Workover Team Lead and agree to circulate bottoms up to ensure plug is set, then POOH to check for fish. 18:00 - 00:00 6.00 KILL P DECOMP P/U one joint and circulate bottoms up at 6.0 bpm (510 bbls). Monitor well. Still have slight gas breaking out. Circulate an additional 70 bbls. Monitor well. Observe less gas break out. Circulate an additional 70 bbls. Still have gas breaking out. Shut in well. Pressure up on well bore to 2500 psi. Monitor no pressure fall off. Bring both pumps on line and circulate well at 12.5 bpm/2480 psi. Observed gas just before bottoms up. Monitor well. Fluid level at surface. Well is static. Bring pump on line at 12.5 bpm/2475 psi and circulate well to sweep tangent section of well bore one more time. Observed gas at bottoms up again. Discuss plan forward with ADW RWO Team Lead. Mix a 40 bbl high-vis pill. 9/27/2008 00:00 - 02:30 2.50 KILL P DECOMP Operations and job scope meeting with Crew that just came on tower. Pump 40 bbl HI-Vis sweep. Chase back to surface with Sea Water at12.5 bpm/2000-2400 psi. Very small amount of gas at bottoms up. Monitor well (1 hour). Circulate one final bottoms up at 12.5 bpm/2425 psi. Saw no gas. Monitor fluid level at surface and well static. No bubble break-out. 02:30 - 05:00 2.50 FISH P DECOMP Pull 10 stands slowly. Stop to flow check well. Normal pipe displacement. Well remains static. (blow down lines and choke manifold). Continue POOH with 4" Drill Pipe, BHA #1 ~, and Fish. Continue normal hole fill volume. 05:00 - 07:30 2.50 FISH P DECOMP Stop halfway out of hole. Circulate bottoms-up just to be safe. Well remains static. Continue out of hole. Contact AOGCC about impending Hydril test. Bob Noble, AOGCC inspector, waived State's right to witness the Hydrill test. 07:30 - 11:00 3.50 FISH P DECOMP B/O and L/D BHA. Find entire SBR assembly with K-anchor. Well is dead, so it is assumed that the tailpipe below the packer has been plugged. The XN nipple in the tailpipe was known to have junk in it. Released two of the standby truckloads of seawater, but keeping two for the packer milling operation. 11:00 - 12:00 1.00 BOPSU P DECOMP R/U to test the BOP Hydril. P/U test plug on test joint and set in Tubing Hanger. Test Hydril to 250-psi low and 3,500-psi for Printed: 10/16/2008 10:39:23 AM ~ ~ BP AMERICA Page 4 of 6 Operations Summary Report Legal Well Name: B-20 Common Well Name: B-20 Spud Date: 9/23/2008 Event Name: WORKOVER Start: 9/23/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/1/2008 Rig Name: DOYON 16 Rig Number: Date From - To Hours Task 'Code NPT Phase Description of Operations 9/27/2008 11:00 - 12:00 1.00 BOPSU P DECOMP 5-minutes each, recorded. 12:00 - 13:30 1.50 FISH P DECOMP M/U acker millin BHA: 8-1/2" x 3-1/2" Metal Muncher Mill, 3-ea 7" Boot Baskets, Bumper Jars, Oil Jars and RIH on DCs. 13:30 - 17:30 4.00 FISH P DECOMP RIH packer milling BHA on DP from Derrick. 30-stands RIH at 1500-hours. 40-stds C~ 1525-hrs. 60-stds ~ 1625-hrs. Stop at 8,885' to service Rig. 17:30 - 19:00 1.50 FISH P DECOMP Cut and slip drilling line. Service dynamic brake. Inspect savor sub. 19:00 - 19:30 0.50 FISH P DECOMP Establish parameters as follows: PUW = 195K. SOW = 162K. RTW = 176K. Torque = 6K. Pump rate = 6.0 bpm/650 psi. Tag 9 5/8" Baker Packer at 8 872' driller's de th 19:30 - 00:00 4.50 FISH P DECOMP Start milling packer as follows: RPMs = 70. Torque = 8 - 9K. WOB = 4 - 5K. Pump rate = 6.0 bpm/650 psi. Pump sweeps as needed. 9/28/2008 00:00 - 09:00 9.00 FISH P DECOMP Continuing Mill on the Baker Packer at 8,872'. Pump sweeps as needed. Vary the drilling with changes in pump rate, weight on bit, rotating speed, and torque. ,j?arker rirnpnad f_ raP~t 0900-ho r 09:00 - 09:30 0.50 FISH P DECOMP Monitor well for 15-minutes and see no changes in fluid level in the annulus or pressure in the drill pipe. Push packer remains down -25' and set 15K-Ibs down on it. pushed Hacker remains to 8906'. 09:30 - 11:00 1.50 FISH P DECOMP P/U one joint to circulate bottoms up. Re-tag packer at 8906'. P/U one joint and start pump; get returns as soon as pump is brought on line. Pump Hi-Vis sweep, 11-BPM, 1600-psi. Get two small burps of gas with bottoms up (509-Bbls total Bottoms Up volume). Monitor well for 15-minutes with no changes. Pump dry job and blowdown top Drive. 11:00 - 14:00 3.00 FISH P DECOMP POH and S/B DP in Derrick. 14:00 - 15:00 1.00 FISH P DECOMP S/B DCs in Derrick, empty Boot Baskets and get 5-gallons of metal cuttings, a few small chunks of packer rubber, 5-strips of control line encapsulation, and a thin chunk of metal. Calculated total pipe displacement was 57-Bbls versus 59-Bbls actual displacement while POOH. 15:00 - 15:30 0.50 FISH P DECOMP Service Top Drive. 15:30 - 16:30 1.00 FISH P DECOMP P/U spear BHA Itco spear (Grapple size = 4.805" Nom, 4.892" - 4.750" catch range), Bumper Jar, Oil Jar, 9-ea 6-1/4" DCs, Intensifier, Pump-out sub. 16:30 - 17:00 0.50 FISH P DECOMP Repair and service Iron Roughneck. 17:00 - 21:15 4.25 FISH P DECOMP Trip in with BHA #3 and 4" Drill Pipe from Derrick. 21:15 - 21:30 0.25 FISH P DECOMP PJSM. Fishing ops and well control with all. 21:30 - 22:00 0.50 FISH P DECOMP Prameters as follows: PUW = 195K. SOW = 160K. RTW = 178K. Free Torque = 5K. Taa fish at 8.906'. Plant spear. Jar fish free. 22:00 - 00:00 2.00 FISH P DECOMP Monitor well. Drop dart to open pump-out-sub. Pull Packer and tubing tail above 7" Liner top. Fluid level remains at surface. Open pump-out-sub (1000 psi). Close in well and attempt to pump into perforations. Pressure up to 2,000 psi pe s p ugge onitor we or-10 minutes. Lost 100 psi in 10 minutes. Circulate bottoms up at 12.0 bpm/1850 psi. Observed no gas. Monitor well. Fluid level at surface and static. 9/29/2008 00:00 - 06:00 6.00 FISH P DECOMP Trip out with 4" drill pipe, BHA #3, and fish. Fish dragging and Printed: 10/16/2008 10:39:23 AM Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Operations Summary Report Date ~ From - T B-20 B-20 WORKOVER DOYON DRILLING INC. DOYON 16 Hours Task ~ Code NPT BP AMERICA Page 5 of 6 Spud Date: 9/23/2008 Start: 9/23/2008 End: Rig Release: 10/1 /2008 Rig Number: Phase Description of Operations 9/29/2008 00:00 - 06:00 6.00 FISH P 06:00 - 08:00 2.00 FISH P 08:00 -.08:30 0.50 CLEAN P 08:30 - 10:00 1.50 CLEAN P 10:00 - 13:30 I 3.50 I CLEAN I P 13:30 - 15:00 1.50 CLEAN 15:00 - 18:00 3.00 CLEAN 18:00 - 20:00 2.00 CLEAN 20:00 - 00:00 4.00 EVAL 9/30/2008 100:00 - 01:30 01:30 - 02:30 02:30 - 10:30 10:30 - 11:00 11:00 - 13:00 13:00 - 00:00 1.50 I EVAL I P 1.00 EVAL P 8.00 EVAL P 0.50 EVAL P 2.00 BUNCO 11.00 BUNCO 10/1/2008 00:00 - 02:00 2.00 02:00 - 03:45 1.75 03:45 - 08:00 08:00 - 09:30 DECOMP hanging up. Stop with 14 stands out. Pump a 25 bbl HI-Vis sweep and circulate back to surface to wash trash off of fish and check for gas. Observed no gas. Continue to trip out with less problem hanging up. Normal hole fill. DECOMP Breakout and UD fish, punching holes above and below every collar and Nipple. No trapped pressure with any punch. UD packer remains, full joint of 4-1/2" tubing, X-nipple on top of full joint, and XN-nipple on top of full joint with WLEG (shear-out sub) on the bottom. DECOMP Clear and clean rig floor. DECOMP M/U Scra er BH : 8-1/2" Bit, 9-5/8" Casing Scraper, 2-ea 7" Boot Baskets, Bumper Jars, and Oil Jars. DECOMP RIH BHA on DCs and DP from Derrick. Scrape from 8700' to 8900' for 3-repeats. M/U to Top Drive and get parameters: 200K-Ibs Up wt, 158K-Ibs Down wt, 177K-Ibs Rot wt at 40-RPM with 5K-Ib-ft free torque, 4-BPM at 210-psi. S/D pump and stop rotating; slowly RIH and tag 7" Liner top at 8918'. P/U and prepare to circulate Hi-Vis sweep. Start moving Rig Camp to Price Pad. DECOMP Pump 20-Bbls HiVis sweep, 10-BPM at 1300-psi. Do not see any gas or debris in returns. Monitor well and well dead. DECOMP B/O and blowdown Top Drive. POH and S/B DP in Derrick. Rig Camp on Price Pad at 1800-hours. DECOMP B/O and UD DCs and BHA. Clear and clean floor DECOMP Pick-up Halco RTTS 9 5/8" Packer. Trip in with 4" drill pipe from derrick. PUW = 175K. SOW = 145K. Set Packer with center element at 8,896'. DECOMP Rig up test equipment. Pressure up on Annulus to 3,500 psi x 30 minutes. Good test. (Lost 50 psi in 30+ minutes). Rig down test equipment. Release RTTS Packer. DECOMP Circulate bottoms up at 12.0 bpm/1500 psi. Observed no gas. Monitor fluid level at surface and static. DECOMP POOH with RTTS Packer. Single down 4" Drill Pipe in Pipe Shed. DECOMP B/O and UD RTTS and pup joint. RUNCMP Clear and clean rig floor and R/U Doyon tubing running equipment and rig up torque turn equipment. RUNCMP Pick up Completion Jewerly as designed. All connections below Packer were Baker-Lok'd. Make-up torque = 4440 fUlbs. Jet Lube Seal Guard used. Continue to single in with 4 1/2" 12.6 Ib/ft 13Cr80 Vam Top tubing as designed, Have 165 Joints ran at midnight. RUNCMP Finished running Completion as designed. Total Joints ran = 207. PUW = 145K. SOW = 135K. RUNCMP Pick-up landing joint. Make-up Tubing Hanger. Land Tubing. RILDS. RU circulating lines. 4.25 BUNCO RUNCMP PJSM with all. Pressure test lines at 3,500 psi. Good test. Start circulating 140 bbls of hot Sea Water (120 degs F.) at 3.0 bpm/140 psi. Followed with 480 bbls of hot Sea Water w/Corrosion inhibitor. 1.50 BUNCO RUNCMP Dro Ball and Rod, let fall on seat. Pressure Up on Tbg to 3500 psi, Set Packer and Pressure Test Tbg to 3500 psi for 30 mins. Good Test. Printed: 10/16/2008 10:39:23 AM ~ ~ BP AMERICA Page 6 of 6 Operations Summary Report Legal Well Name: B-20 Common Well Name: B-20 Spud Date: 9/23/2008 Event Name: WORKOVER Start: 9/23/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/1/2008 Rig Name: DOYON 16 Rig Number: Date i From - To Hours ' Task Code NPT Phase Description of Operations 10/1/2008 09:30 - 10:30 1.00 BUNCO RUNCMP Bleed Down Tbg Pressure to 1500 psi. Pressure Upon IA to 3500 psi and Pressure Test Tb b Casin Annulus to 3500 si for 30 mins. Good Test.. 10:30 - 11:00 0.50 BUNCO RUNCMP Bleed Down Pressure in Tbg and Shear Out Valve in Top GLM at 2700 psi differential pressure. Pump 3 bpm at 220 psi both ways through valve. 11:00 - 12:00 1.00 BUNCO RUNCMP Cameron Wellhead Hand Set TWC in Tbg Hanger. Pressure Test TWC to 3500 psi from above for 10 mins and 1000 si below for 10 mins. Good Test on Each. 12:00 - 14:00 2.00 BOPSU P RUNCMP Blow down lines. Drain stack. Nipple down BOPE. 14:00 - 17:00 3.00 WHSUR P RUNCMP Nlpple up Adaptor flange. Nipple up Production Tree. 17:00 - 19:30 2.50 WHSUR P RUNCMP Test Adaptor Flange at 5,000 psi x 30 minutes. Fill Tree with diesel. Test Tree at 5,000 psi x 30 minutes. Good test. 19:30 - 20:30 1.00 WHSUR P RUNCMP Pick-up lubricator. Pressure test at 500 psi. Good. Pull TWCV. La down same. 20:30 - 23:00 2.50 BUNCO RUNCMP PJSM with all. Rig up Lil' Red. Pressure test line. Pump 150 bbls diesel down the annulus at 3.5 bpm/650 psi. Allow diesel to u-tube. 23:00 - 23:30 0.50 WHSUR P RUNCMP Install BPV. Test BPV from below at 1000 i x 10 minutes. Good test. Rig down Lil' Red. 23:30 - 00:00 0.50 WHSUR P RUNCMP Blow down lines. Secure cellar. Prep to rig down. Release Rig Printed: 10/16/2008 10:39:23 AM Doyon 16 BOP Test, Post Hydril Use, 9-27-2008 Maunder, Thomas E (DOA) From: Regg, James B (DOA) Sent: Monday, September 29, 2008 8:08 AM To: Maunder, Thomas E (DOA) Subject: FW: Doyon 16 BOP Test, Post Hydril Use, 9-27-2008 Attachments: BOP Test Report-Hydril Only- Doyon 16 9-27-2008.x1s Jim Regg AOGCC ~ f3~~1J~i 333 W.7th Avenue, Suite 100 ~ °;a:e3~~~~ - ~ ~ `~ Anchorage, AK 99501 9Q7-793-1236 Page 1 of 1 From: NSU, ADW Drlg Rig 16 [mailto:NSUADWDrIgRig16@BP.com] Sent: Saturday, September 27, 2008 2:02 PM To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay Cc: Derrick, George (Mackie) M; Reem, David C; Engel, Harry R; Rossberg, R Steven; rig16@doyondrilling.com Subject: Doyon 16 BOP Test, Post Hydril Use, 9-27-2008 Gentlemen---September 26th, 1100-hours, Doyon 16's Hydril was actuated to help circulate out gas through the choke manifold and gas buster that had been liberated when an SBR and K-anchor assembly were released downhole during a fishing operation. There was no danger of losing well control, but we felt that it was to our advantage to take the gas-cut circulation fluid through our manifold and gas buster. We contacted AOGGC, North Slope Inspectors, within minutes of the well shut-in, leaving a message. September 27th, at about 0630-hours, we gave AOGCC NS Inspectors atwo-hour notification that we were going to test the Hydril. Bob Noble returned the call shortly thereafter waiving the State of Alaska's right to witness the Hydril test. It was successfully tested at 1130-hours, September 27th, to 250-psi low and 3,500-psi high without any adjustment or repairs to our BOP equipment. The reason for the longer time lag was that we took 1-1/2-hours to breakout the fish that was recovered. We at first did not think we had all of the fish. Many thanks for your consideration in this matter. Please let me know if you need any further information. Regards, Mike Rooney, Wellsite Leader, Doyon 16 «BOP Test Report-Hydril Only- Doyon 16 9-27-2008.x1s» 9/29/2008 Doyon 16 BOP Test, Post Hydril Use, 9-27-2008 Page 1 of 1 • Regg, James B (DOA) ~ ~'~ ~~~^ ~~~ From: NSU, ADW Drlg Rig 16 [NSUADWDrIgRig16@BP.com] ~ ~ ~~) ~ Sent: Saturday, September 27, 2008 2:02 PM ~ ~ ~ l To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay Cc: Derrick, George (Mackie) M; Reem, David C; Engel, Harry R; Rossberg, R Steven; rig16@doyondrilling.com Subject: Doyon 16 BOP Test, Post Hydril Use, 9-27-2008 Attachments: BOP Test Report-Hydril Only- Doyon 16 9-27-2008.x1s Gentlemen---September 26th, 1100-hours, Doyon 16's Hydril was actuated to help circulate out gas through the choke manifold and gas buster that had been liberated when an SBR and K-anchor assembly were released downhole during a fishing operation. There was no danger of losing well control, but we felt that it was to our advantage to take the gas-cut circulation fluid through our manifold and gas buster. We contacted AOGCC, North Slope Inspectors, within minutes of the well shut-in, leaving a message. September 27th, at about 0630-hours, we gave AOGCC NS Inspectors atwo-hour notification that we were going to test the Hydril. Bob Noble returned the call shortly thereafter waiving the State of Alaska's right to witness the Hydril test. It was successfully tested at 1130-hours, September 27th, to 250-psi low and 3,500-psi high without any adjustment or repairs to our BOP equipment. The reason for the longer time lag was that we took 1-1/2-hours to breakout the fish that was recovered. We at first did not think we had all of the fish. Many thanks for your consideration in this matter. Please let me know if you need any further information. Regards, Mike Rooney, Wellsite Leader, Doyon 16 «BOP Test Report-Hydril Only- Doyon 16 9-27-2008.x1s» 9/29/2008 ! STATE OF ALASKA ~ 11/14/07 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report ~~Z~Ct~' ~~ Submit to: iim.regg a(~.alaska.gov ~ t doa.aor~cc.prudhoe.bay ~a alaska.gov bob.fleckenstein(a~alaska.gov Contractor: Doyon Rig No.: 16 DATE: 9/27/2008 Rig Rep.: Andy Honea Rig Phone: 659-4169 Rig Fax: 659-4163 Operator: BPXA Op. Phone: 659-4168 Op. Fax: 659-4163 Rep.: Mike Rooney ~ Field/Unit & Well No.: PBU B-20 PTD # 1821680 Operation: Drlg: Workover: X Explor.: Test: Initial: X Weekly: Bi-Weekly Test Pressure: Rams: 250/ 3500 Annular: 250/ 3500 Valves: 250/ 3500 TEST DATA MISC. INSPECTIONS: FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Well Sign P Upper Kelly 1 P Housekeeping: P Drl. Rig P Lower Kelly 1 P PTD On Location P Hazard Sec. P Ball Type 1 P Standing Order Posted P Inside BOP 1 P BOP STACK: Quantity Size Test Result av~ ~ ~~~ CHOKE MANIFOLD: Annular Preventer 1 13-5/8" P .~~}e.G( ~t,z'7'6~ Quantity Test Result Pipe Rams 0 NA NA No. Valves 14 P Lower Pipe Rams 1 3-1/2" x 6" P Manual Chokes 1 P Blind Rams 1 13-5/8" P Hydraulic Chokes 1 P Choke Ln. Valves 1 3-1/8" P HCR Valves 2 3-1/8" P ACCUMULATOR SYSTEM: Kill Line Valves 1 3-1/8" P Time/Pressure Test Resu Check Valve 0 NA NA System Pressure 3050 P MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P Test Results Pressure After Closure 1850 P 200 psi Attained 15 sec P Full Pressure Attained 1 min 17 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 5 @ 2025-psi ', Number of Failures: 0 Test Time: .5 Hours Components tested ~1 Repair or replacement of equipment will be made within 0 days. Notify the North Slope ', Inspector 659-3607, follow with written confirmation to Superviser at: }im.regg(c~alaska.gov ',Remarks: The Hvdril had been actuated September 26th to help circulate out gas-cut seawater that had been liberated when an SBR and K-anchor seal assembly was pulled loose from a packer during a fishing 24 HOUR NOTICE GIVEN YES X NO Date 09/26/08 Time 0630-hrs est start 1100-hrs-9-2i Finish 11 aived By Bob Noble Witness Roonev/Honea BOP Test (for rigs) BFL 11/14/07 BOP Test Report-Hydril Only- Doyon 16 9-27-2008.x1s • • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Tuesday, October 16, 2007 9:07 AM To: 'Preble, Gary 6 (SAIC)' Subject: B-20 {182-168} Gary, I am reviewing the 404 you sent for pulling the long patch. 1 looked into the well file and there is an email notice that the well has sustained casing pressure and is being evacuated for a long patch. There is no report of the patch installation. Could you please send the installation reports? Email is fine. According to the "matrix", a 404 should be sent when a patch is installed. Call or message with any questions. Tom Maunder, PE AOGGC Maunder, Thomas E (DOA From: Preble, Ga B SAIC Ga Preble ~ ~s Sent: Tuesday, October 16, 2007 9:51 AM To: Maunder, Thomas E (DOA) Subject: Emailing: B-20-tubing-patch.pdf Attachments: B-20-tubing-patch.pdf ' ~ bQ~t'G.St-~OrS ~'2~©C~`T C7.~GCh~ ~C7 ~~~"'` ~Q~ FS~ B-20-tubing-patch. pdf (49 KB) ~~'I ITV 1 , _ t «B-20-tubing-patch.pdf» The message is ready to be sent with the following file or link attachments: B-20-tubing-patch.pdf Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. STATE OF ALASKA ~6~ ALA A OIL AND GAS CONSERVATION COM SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulated Other ~ pull tubing patch Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat. Shutdown Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~~ Exploratory is2-16so - 3. Address: P.O. Box 196612 Stratigraphic l ~ $erviCe ' 6. API Number: Anchorage, AK 99519-6612 50-029-20842-00-00 7. KB Elevation (ft): 9. Well Name and Number: 80 KB ~ PBU B-20 ' 8. Property Designation: 10. Field(Pool(s): ADLO-028310 PRUDHOE BAY Field/ PRUDHOE OIL Pool . 11. Present Well Condition Summary: Total Depth measured 10047 feet Plugs (measured) None true vertical 9252.43 - feet Junk (measured) 9886 Effective Depth measured 9907 feet true vertical 9118 feet Casing Length Size MD TVD Burst Collapse Conductor 110 20" 91.5# H-40 37 - 107 37 - 106.98 1490 470 Production 9154 9-5/8" 47# L-80 35 - 9189 35 - 8439.51 6870 4760 Liner 1107 7" 26# L-80 8933 - 10040 8206.26 - 9245.71 7240 5410 Surface 2678 13-3/8" 72# L-80 SURFACE - 2678 SURFACE - 2678 5380 2670 Perforation depth: Measured depth: S 9696' - 9758' S 9752' - 9758 S 9770' - 9790' O 9800' - 9818' O 9825' - 0838' True Vertical depth: S 8916' - 8975' S 8969' - 8975' S 8987' - 9006' O 9015' - 9033' O 9039' - 9052' Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 34 - 8848 4-1/2" 12.6# L-80 8848 - 8997 Packers and SSSV (type and measured depth) 9-5/8"X5-112" BKR PKR 8848' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: Shut in 0 0 0 0 Subsequent to operation: Shut in 0 0 0 0 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory ~ Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas WAG ~ GINJ WINJ ~ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 10/8/2007 Form 10-404 Revised 04/2006 ~ ~ ~ ~ ~ (~ ~ ~ ~~~ ~~~J r ~~ ~ ('~~ ,~~ ~tp ~`~ Submit Original Only .. f' B-20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITYDATE I SUMMARY- 9/15/2007'CTU # 9 W 2 3/8" CT. Pull Patch and Lower Packer, Complete BOP testing, _: Balance well out by circ tubing and IA to i %KCL. Winds kicked up to 25+ MPH. GO TO WEATHER STANDBY. Well secure. Ready to retrieve patch when wind 4subsides. "*'`Continued on 9/16/07 WSR*** 9/16/2007 Pull Patch & lower Packer/ CTU #9 w/ 2-3/8" CT/ w/WWP. ""*Continued from '9/15/07 WSR*** Prep to fish patch. No-flo well -good. CMIT TxIA to 2500 psi. - `pass. MU and RIH with 4" GS. Latch patch at 2186' ctmd. POOH. Laying down 3- '=1/2" ST-L.. Continued on 9!17/07 9/17/2007' CTU #9 w/ 2 318 CT, Pull patch and lower Packer. Pull out and lay down remaining 41 joints of the patch, Pickup GS baited ITCO Spear. RIH and latch packer at 7361' ctmd. Pulled free with 39k overpull. POOH. Recovered lower 5-1/2" SLPR packer. Freeze protect IA with 115 bbls of diesel. Circulate in 82 diesel to freeze protect .tubing. RDMO. Release WWP. Notify Pad Operator of well status. Master and swab flagged and tagged. ***Job Complete'`** FLUIDS PUMPED BBLS 50 1 %KCL 210 DIESEL 260 TOTAL I • $-~o DESCRIPTION aF WURI~ CaMPLETED ~vR~o oPERATIONs EVENT SUTVIIVIARY ...., .. ACTiVl7YDATE; ;: :.: SUMR~ARY; ; 5/27/2005:Tubing Patch! CTU #9 with 2 3f8" coil. MERU. Mate up to WWP. Drift coil with :1.746" baN after cutting out bad spot (230') and re-welding. Perform BOP test. *** Continue on 5!28/05 WSR *" 5/28/2005 Extended Tubing Patch. GTU # 9 with 2318" Cail. Continue from 5127105 WSR. Complete BOP testing. RIH with 2.20" OD PDS carrier logging tools and 2.50" OD JSN. Log interval 7675' - 4750' ctm. Flag pipe at 7300'. POOH. No-flo test Weil. Tie log into PDS Caliper dated 30-Nov-02. Make 6' depth adjustment. MU =and R{H with 4 112" x 5 112" tower SLPR liner hanger packer. Tie in at flag and ;set top of packer at 7340'. Perform CM1T TxIA to 2000 psi passed. Lost 95 psi in 30 min. Release from packer and POOH. No-fla test watt. MU and RIH with seal :unit, 3 112" ST-L, L-80 tubing, and upper SLPR packer. -----Note: SLPR packer rated to 2500 psi as per Baker------- *** Continue an 5/29/05 WSR **' 5129/2005 Extended Patch. CTU # 9. & WWP. 2 318" Goi{. Continue from 05128105 WSR. :Hold well control drift. Run 67 joints ofi 31 f2" ST-L tubing and upper SLPR packer 'ta 6802`/ detect pin hole in coil. POOH, hang patch off in #ubing hanger. Secure weft, RQ. W iii return after pipe swap. *** Continua an 5/30/05 WSR ;*'` 5/3012005 Emended Tubing Patch. CTU # 9 & WWP. 2 3f8" Coil. Continue from 5/29/05 WSR. Replace pipe. Drift coif with 1.746" bail. Function test BOP's. *** Continue on 5/31/05 WSR *** ... 5131/2005; Emended Tubing Patch. CTU # 9 &WWP . 2 3/8" coil. Continue from 5f30l05 WSR. RIH with 4" GS and retrieved patch that was hung off in the tubing hanger. `RIH with upper SLP {finer hanger packer and 3112° tubing patch (Total length 2205'}. Before stinging in lower packer, pump 52 bbts 2°f° Inhibited KCL water between packers an the 3 112". Sting into tower packer and set upper packer at :5221'. PT coil x tubing annulus to 2000 psi. to tracking. Release from packer and pooh. RIH with 3 3/8" tBP. Set IBP at 52i 0'. PT coif x tubing annulus to 1500 psi. Good test. Test to to t 000 psi -good test. Release lBP and test IA again to 1500 ;psi -Test failed. Confirm upper packer teak. POOH. R1H with 3.479" N.C. grapple Ctco spear. Complete one down jar lick {6k} and sting into upper packer to ;retrieve one straight pull (32k) aver and latched. POOH. Surface. Recover SLP packer, missing element. *"' Continue on 6!1/05 WSR"'`* 6/1/2005'Set a 6" Ciw SPV far Klondike to move off well. 6/1/2005: Extended Tubing Patch. CTU # 9 with WWP. 2 3f8" Coil. Continue from 5!31!45 WSR. Pull and re-run new upper SLP packer and 31/2" tubing. RtH with string, {total length = 2215'}. Sting in to bottom packer at 7360' ctm and set upper packer 5211'. PT coil x tubing annulus to 850 psi .Goad test lost 42 psi in 30 minutes. PT 1A to 1000 psi. Pass test lost 67 psi in 30 minutes. Patch in place. Release from packer and POOH. RDMO. Ready for MITIA. Notify Pad op of well status **" Job Complete *** 'Note : Da not pressure MIT to over 2000 psi differientially as t3aker SLP packers are rated to 2500 psi Schlumberger Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 ATTN: Beth Well MPC-41 MPG-05 MPL-33 P-06A DS 02-25 u.~. 09-10 B-20 Y-25 PSI-10 P-26 02-14A F-12 04-35 ~ 5-09A 15-09A 5-09A . J-13 D.S. 09-29 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 10889195 10715440 11058514 11132061 10987525 11058237 10980591 10928605 10715447 10928634 11075901 NA 10889172 10889183 NA 10919942 10877750 10980596 }C $CANNED OCT 3 1 2005 Log Description SBH SURVEY MPSP INJECTION PROFILE INJECTION PROFILE LDL INJECTION PROFILE INJECTION PROFILE ~---y\\'~ ~ LDL MEM PPROF W/DEFT MPSP IPROF & WARMABACK MEM PPROF W/DEFT MEM PPROF & IPROF LDL SBHP SURVEY OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE LDL PPROF W/DEFT o&-~~- Date 12/24/04 11/09/04 06/03/05 10/12/05 06/24/05 08/16/05 08/05/05 11/20/04 01/01/05 06/02/05 07/09/05 06/03/05 10/10/04 11/04/04 02/02/05 02/13/05 06/29/04 08/10105 NO. 3503 10/18/05 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Color CD .~ ~ Alaska Data & Consulting Services 2525 Gambell Street. Suite 40 Anchorage, AK 99503- 8 ATTN: Beth Received by: , tJ ~ ()tv.,j l ~'"- ,,-=~.,,." '''.c~~' -,'_.0' ¡;;;f, , .- '-":- ~ -- --- ~- =-~- -. ; - £ ,> ,~. '. -,.. - .:0. - __ .' .-..;'>-~ _.." . . . '. .~'" ,7,...,.1& _.- B-20 (PTD # 1821680) Classified as Problem Well :·.C..:'· .......: .:.... "'. ":." .....,: ".:' ..: ".:'., .') .'."" .': . . :.,'.,":",:::--'.' ..:..:.........::..::--.:--'.. ...... .'.'::.", ,·c.·'.·..·,'.. ':' S·~·ìê·~~m,~~tþI~I(J8~),f0~~~~~~~~,:~~~~~~~l..,........,....i.."..··.;;·.;....·¡ ,..........'....,. ....'.;.'.....'..,.......b:./,,........... )1)~~e¡:,$µ~;@~. M~gQ.q5~~:19:4:~tO~Ø:~:' :..' ) lb/6 All, Well 8-20 (PTD #1821680) has been found to have sustained casing pressure on the IA and OA. The TIO's on 03/25/05 were 2100/2090/220. The well is currently unsecured for evaluation for a long patch. The plan forward for this well is as follows: 1. WAV: 14 day flow waiver 2. EL: FSPL 3. EL: Set IBP to secure 4. Eval for extended patch The well has been classified as a Problem well. Please call if you have any questions. Thank you, }l nna (j)u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659..5102 Pager: (907) 659-5100 x1154 «B-20.pdf» Content-Description: B-20.pdf B-20.pdf Content-Type: application/octet-stream Content-Encoding: base64 SC;.i~~~NE.D !~Ph; } LJ lG 1 of 1 3/29/2005 4:47PM ) TREE = 6" IVICEVOY WELLHEAD = IVICEVOY A crUA TOR = OTIS KB. ELEV ,,; 80.03' äF. ELEV ,;; ."".. 44.ti3i KOP = ' 3100" Max Angle = 35 @i 6400' 'ÖäiÚ n:ï'tiïiÖ;; ··..·..·······..····S6"i5 äi Datum TVD = 8800' SS I 13-3/8"CSG, 72#,L-80, 10=12.347" H 2678' r---J Minimum ID = 3.725" @ 8959' 4-1/2" OTIS XN NIPPLE 5-1/2"TBG,17#,L-80,.0232bPf,ID=4.892" H 8848' ITOPOF 7" LNR 1-1 8933' 14-1/2"TBG,12.6#,L-80,.0152bpf,ID=3.958" H 8997' 1 ~ 19-5/8" CSG,47#, L-80, 10= 8.681" 1-1 9189' PERFORA 110N SUVlM6. RY REF LOG: DA-BHCA, 11/21/82 ANGLEATTOPPERF: 17 @ 9696' Note: Refer to Production DB for historical perf data SIZE SR= INTERVAL Opn/Sqz DATE 3-1/8" 4 9696 - 9748 S 08/15/98 3-318" 4 9748 - 9758 S 08/15/98 3-3/8" 6 9752 - 9758 S 12/13/99 2-7/8" 4 9770-9790 S 08/15/98 2-718" 4 9800-9818 0 08/15/98 3-3/8" 4 9825 - 9838 0 12/13/99 1 ffiTD 1-1 9865' 17" LNR, 26#, L-80, .0383 bpf, 10 = 6.276" 1-1 10040' I DATE 11/26/82 OS/27/01 12/08/02 06/07/04 07/28/04 REV BY COM\llENTS ORIGINAL COM PLETION Rt>VTP CORRECTIONS JM'tlh GL V C/O LDKlKAK SEfWEA THERFORD BP JLVTLP RJLL IBP [)6. TE 8-20 I ~ .. REV BY e ) I SAFETY NOTES: 2169' H5-1/2" 011S ROY SSSV LANDING NIP, 10= 4.562"1 GAS LIFT M6.NDRELS ~ ST MD TVD DE\! TYPE VLV LATCH PORT DATE 10 3099 3017 10 011S DMY RM 0 11/30/02 9 4804 4602 29 011S DMY RA 0 8 6083 5718 35 011S DMY RM 0 11/30/02 L 7 6906 6394 33 011S DMY RA 0 6 7444 6846 34 011S DMY RA 0 5 7596 6972 34 011S DMY RM 0 11/30/02 4 7963 7277 32 011S DMY RA 0 3 8120 7410 32 011S DMY RA 0 2 8522 7758 28 011S DMY RA 0 1 8681 7899 27 011S DMY RA 0 11/30/02 I I i - COfv1MENTS 8783' 1-15-112" OTISXA SLIDING SLV, 10= 4.562" 8824' I~ BKR SBR SEAL ASSY 1 8848' 1-19518" x 5-1/2" BKR PKR 8848' 1-15-112" X4-1/2"XO I 8921' 1-14-112" OTIS X NIP, 10 =3.813" 1 8959' 1~4-112" OTISXN NIP, 10= 3.725" I 8997' 1-14-112" lTL BKRSO SUB I ~ 9016' 1-1 ELMO TT LOGG ED 02/12/90 1 9578' I~ M6. RKER JOINT I 9886' 1-1 FISH - ('AM SANNER SHELD IN HOLE, 06/04/92 FRUOHOE SAY UNIT WELL: &20 PERMIT No: 1821680 A A No: 50-029-20842-00 SEC31. T11N, R14E BP Exploration (Alas ka) f--',~ STATE OF ALASKA ~, ALASKA .~,L AND GAS CONSERVATION CC..MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing . []Alter Casing [] Repair Well [] Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564' SNL, 1895' WEL, Sec 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, Sec 29, T11 N, R14E, UPM At effective depth 889' NSL, 827' EWL, Sec 29, T11N, R14E UPM At total depth 906' NSL, 861' EWL, Sec 29, T11N, R14E, UM PPRO 5. Type (~ well: Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 80.03 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-20 9. Permit Number / Approval No. 82-168 / 10. APl Number 50- 029-20842 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10047 feet true vertical BKB 9252 feet Effective depth: measured 9907 feet true vertical BKB 9118 feet Plugs (measured) Junk (measured) 9865'--- pbtd (01/10/2000) corrected Casing Length Size Cemented MD Structural Conductor 110' 20"X30" 81 c.f. 146' Surface 2642' 13-3/8" 3720 c.f. 2678' Intermediate 9153' 9-5/8" 1375 c.f. 9189' Production Liner 1107' 7" 381 c.f. 8933' - 10040' TVD BKB 146' 2678' 8440' 8207'-9245' Perforation depth: measured Open Perfs 9800 - 9818, 9825 - 9838 Sqzd Perfs 9696 - 9758, 9770 - 9790 true vertical Open Perfs 9014 - 9032, 9039 - 9052 Tubing (size, grade, and measured depth) 5-1/2" L-80 tubing to 8848' with 4-1/2 tubing tail @ 8997' Packers and SSSV (type and measured depth) 9-5/8" Baker Packer @ 8848' 5-1/2" SSSV @ 2169'. 13. Stimulation or cement squeeze summary See Attachment RECEIVED Intervals treated (measured) Treatment description including volumes used and final pressure MAY 02 2001 Alaska 0il & Gas Cons. Commission Anchorage 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended [] Daily Report of Well Operations 17. I herebv.~;ertify that t~e fore,al'Cng is true ar~ correct to the best of my knowledge Title Technical Assistant Form 10-404 Rev. 06/15/88 Service Prepared By Name/Number: Date ~AA/ ~ De WaYne sch norr '~6 4-5174 ~'~ ~Ubmit In DuPiicate~ 03/03/2001 B-20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS CTD-PREP WORK: PT MASTER AND WING VALVE TO 5000 PSI. SUMMARY 03/03/01 PT MASTER AND WING VALVE. (PASSED) Fluids Pumped BBLS. 0.24 Description 10 GALS OF DIESEL. 0.24 TOTAL MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU: FROM: Jeff Jones, DATE: Tom Maunder, ~ ~/~~ P. I. Supervisor ~\/\c~- E~\ SUBJECT: Petroleum Inspector January 18, 2001 Safety Valve Tests PrudhOe Bay Unit B Pad Thursday, January, 18, 2001: I traveled to BPXs B Pad and witnessed the 'semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report shoWs I witnessed the testing of 17 wells and 34 components with 2 failures. The. Pilot on well B-18 tripped below the required set point and the pilot on well B-21 was frozen. Both failures were repaired and-suCessfully retested before I departed location. The' new style pilot insulation box fabricated using pipeline insulation installed on most wells on this pad should be installed onthe remaining SVS pilots to eliminate the freeze up problems evident on this pad. I also inspected the well houses on this pad while witnessing SVS testing. All the well houses inspected were clean and the equipment appeared to be in good cOndition. Summary: I witnessed the SVS testing at BPXs PBU B Pad PBU B Pad, 17 wells 34 components 2 failures 5.8% failure rate 22 well house inspections Attachment: SVS PBU B Pad 1-18-01 JJ X Unclassified Confidential Confidential (Unclassified if doc. removed ) SVS PBU B Pad ~-18-01 JJ.doc Alaska Oil and Gas Conservation Commission "Safety Valve SYstem TeSt Report Operator: BPX Operator ReP: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By:Jeff Jones Field/Unit/Pad: pBF /PBU /B Pad, SeParator'psi: LPS 174 Date: 1/18/01 HPS 658 Well Permit .Separ Set i L/P Test · Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code· Code Code Passed GAS or CYCLE B,01. 1700080 174 1251 120 P P OIL B-02A ' 1961'110 658/174 550/125 500/120 P P OIL .B-03B 1870480 B-04 1700320 . . B-05A 1960990 B-06 .1770740 174 125 120 P P OIL B-07 1780020 ' 658' 550 520 'P P OIL B-08 1780410i658/.174 550/125 510/1'10 P :P OIL B-09 1780490 B-10 1780540 174 ' 125 H0 P ' P OIL B-11 ' 1780690 ' ' B'12A ' 1970090 658 550. 530 ' P P OIL B-13A 1990570 B-14 1780930 . -. B-15 1790190 · B-16 1790250 B-17 1790280 B-18 1820020 658 550 '0 3 P 1/18/01 OIL' B-19 182003'0 174 125 · .120 P P OIL B-20 .'1821680 174 125 120 P P OIL B-21 1821760 '658 550 5101 2 P 1/18/01 OIL B-22 1820890 B,23A 1970590 658/174 550/125 550/120 P P OIL · B-24 1821400 ' B-25 1821510 174 125' - 115 P P OIL B,26B 2000570 '174 125 " '125 P P OIL B-27A 1961010 658/174 550/125 520/125 P P OIL B-28 1853030 B-29 1860140 · B-30 1860310 ' B-31 .1910460 . · B-32A 1991180 . B-33A 1931450 174 '125 115, P P OIL . B-34 · 1930370 1/lo/t~l Paoe 1 r~f9 ,qVg PglI B Pad 1-18-01 JJ.xls : Well· Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed (;AS or CYCLE B-35 1931460 B-36 1960650 658/174 550/125 540/120 P P OIL J-05B 2000180 . · . .. Wells: 17 Components: 34 Failures: 2 Failure Rate: 5.8% []9o var Remarks: The 2 failures were corrected and passed a retest. Pad 1-18-01 JJ.Xls '~'"'~ STATE OF ALASKA ,~LASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Perforate X Pull tubing Alter casing __ Repair well __ Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564' SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889' NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906' NSL, 861' EWL, SEC. 29, T11N, R14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 80.03 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-20 (14-29-11-14) PBU 9. Permit number/approval number 82-168 / 10. APl number 50- 029-20842 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 10047 feet BKB 9252 feet Effective depth: measured 9907 feet true vertical BKB 9118 feet Casing Length Size Structural -- Conductor 110 20x30 Surface 2642 13 3/8 Intermediate 9153 9 5/8 Production -- Liner 1107 7 Perforation depth: measured 9800'-9818', 9825'-9838' Plugs (measured) Junk (measured) Cemented ORIGINAL fill at 9907' (06/88) 9c.y. 3720 c.f. 1375 c.f. 381 c.f. Measured depth True vertical depth BKB 146 146 2678 2678 9189 .8440 8933-10040 8207-9245 Squeezed off: 9696'-9758, 9770'-9790' true vertical subsea 8886'-8972' (three intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 8848'; 5 1/2" SSSV at 2169' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 767 7382 233 0 1617 22847 85 0 Tubing Pressure 194 1816 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operatio,~s.) Oil X Gas__ Suspended ~J~b~,~rtify that7 foreg~i~g~//~/is true~fctcto the best of my knowledge. Signe~ (,_,J/,~/,J~_,FJ'" /,,'~ ~,'~-b,/~ Title TechnicalAssistant III Form 10-404 Rev 06/15/§8 - j -- - '- Service Date SUBMIT IN DUI~LI~AT~_, WELL B-20 (14-29-11-14) Addperf 2/13/96 The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9752- 9758 MD' LARRY GRANT Attn. ALASKA ©SL ~ GAS C©~ISERVATION 3001 PORCUPINE DRIVE A ...... RAG~ AK, 99501. Date: 26 April 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Si~/~adam =. ~ the Enclosed, please ~zn~ ~ data as described below: WELL B-22 (32-32-11-i4) B-20 (14-29-11-14) H-22 (21-11-13) H-32 (42-20-11-13) DESCRIPTION i PLS FINAL BL+RF~ 1 PLS FINAL BL+RF~/ ECC No. Run # 1 604.07 1 PLS FINAL BL+RF~ Run # 1 1423.10 Run # 1 1539.06 1 PFC/PERF FINAL BL+RE,/ Run # 1 1 PFC/PERF FINAL BL+RF~ Run # 1 1 PLS FINAL BL+RF ~ Run # 1 Run # 1 1 PLS FINAL BL+RF 5604.06 5626.05 6016.07 6170.09 Received by: Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 ~/ O r~~07) 563-7803 ~~, Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE Date: 8 November 1995 Transmittal of Data AK, 99501. Sent by: HAND CARRY Dear Sir~Madam, . ~llb~ ~.\ ~/// Enclosed, please find the data as described below . - ~ - 9-11-14 ) 1 B-28 (32-29-11-14) 1_ Please sign and return to: Attn. Rodney. D. Paulson AtlaSsuite5600 B Wireline201Street Services Or FAX to (907) 563 7803 ' - LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 24 October 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL B-20 (14-29-11-14) DESCRIPTION I CN/GR FINAL BL+RF i CN/GR FINAL BL+RF i PLS FINAL BL+RF "~ ~' ~ B-14 (43-32-11-14) E-10 A-09 1 CN/GR FINAL BL+RF I PDK FINAL BL+RF I PLS FINAL BL+RF ECC No. Run # 1 1539.04 Run ~ 1 3771.07 Run # 1 Run # 1 5073.06 Run # 1 5655.02 Run # 1 5694.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: ~ , ~FAX to (907) 563-7803 STATE OF ALASKA ALA,S ;'"-'3..IL AND GAS CONSERVATION COMMISSIO~'-'X REPORT SUNDRY WELL OPEhATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564' SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889'NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906'NSL, 861'EWL, SEC. 29, T11N, R14E, UPM 5. Type of Well: Development X Exploratory Strat~raph~c Sewice OR!OINAL 6. Datum elevation (DF or KB) KBE = 80.03 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-20 (14-29-11-14) PBU 9. Permit number/approval number 82-168 / 10. APl number 50- 029-20842 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 10047 feet BKB 9252 feet Effective depth: measured 9907 feet true vertical BKB 9118 feet Casing Length Size Structural -- Conductor 110 20x30 Surface 2642 13 3/8 Intermediate 9153 9 5/8 Production -- Liner 1107 7 Perforation depth: measured 9800'-9818', 9825'-9838' Plugs (measured) Junk (measured) fill at 9907' (06/88) Cemented Measured depth 9 c.y. 146 3720 c.f, 2678 1375 c.f. 9189 381 c.f. True vertical depth BKB 146 2678 8440 8933-10040 8207-9245 Squeezed off: 9696'-9758, 9770'-9790' true vertical subsea 8886'-8972' (three intervals) Tubing (size, grade, and measured depth) 5 1/2"L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 8848~ 5 1/2" SSSV at 2169' RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure OCT 3 4 1994 Alaska 0il & Gas Cons. Cornmissio Anchora~,e 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 951 3631 124 1060 4948 151 Tubing Pressure 201 219 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby c. ertify that the foregoing is true and correct to the best of my knowledge. Signed ~L~' ~ ~ '~~ Title Senior TechnicalAssistantl Form 10-404 Rev 06/15/88 Service D at · /~,//~'/~ SUBMIT IN DUPLICATE 5/03/94 WELL B-20(14-29-11-14) Stimulation Ooeration A HCL Treatment was performed to remove scale using the following fluids: SUMMARY PICKED UP 3" JETTING NZL. RIH. TAGGED BTM @ 9823 CTD. CORRECTED TO WL TAG OF 9833. TREATED PERFS AS PER PROGRAM. PUMPED 12 BBL HEC GEL W/200g DIVERT 1, 12 BBL SW SPACER, 12 BBL XYLENE, 60 BBL 15% HCL W/20% XYLENE, OVERFLUSHED 60 BBL SEA WTR INTO FORMATION. INITIAL INJ RATE WAS 3.5 BPM @ 1200 PSI DURING KILL OPERATION. SAW 300 PSI INCREASE IN WHP DURING DIVERT STAGE. SAW 100 PSI TOTAL DROP IN WELLHEAD TREATING PRESSURE DURING XYLENE AND ACID TREATMENT. PUMPED .5 BPM DOWN COIL/TBG ANNULUS DURING TREATMENT. KICKED WELL OFF W/POOR BOY JUMBER FROM B-21. BBLS. 440 12 12 60 7 FLUIDS PUMPED DESCRIPTION SEAWATER, FILTERED TO 3 MICRONS HEC GEL W/200g DIVERT 1 15% HCL W/20% XYLENE MEOH RECEIYED OCT 1 4 Alaska Oil & Gas Cons. Com;lssion ~o~e ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 16 June 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~- ~-~ 2-46/Q-15 ~1~ 2-42/P-13 (MPI) ~--~\ D-19 (22-23-11-13) Bl-I%% B-20 (14-29-11-14) DESCRIPTION ECC No. ~! PDK/GR LDWG TAPE+LST Run # 1 3842.03 ~ PDK/GR LDWG TAPE+LST Run # 1 6209.00 · /1 PDK LDWG TAPE+LISTER Run # 1 3061.04 /1DIFL LDWG TAPE+LISTR Run # 1 6210.00 Run # 1 3820.01 Run # 1 1539.03 jl CN/GR LDWG TAPE+LIST /~1 CN/GR LDWG TAPE+LIST Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Pau!son Received by: Please s i~n and ~e%u~ %0: Petrotec~ical Data Center BP ~ploratton (Alaska) 900 East Benson Boulevard ~chorage, ~ka 99908 ,,,, Received by Date ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 3 June 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION B-O1 (23-31-11-14) /! PLS SURVEY FINAL BL 1 PLS SURVEY RF SEPIA ~-20 ~ CN/GR FINAL BLUELINE 1 CN/GR FINAL RF SEPIA 31 PLS SURVEY FINAL BL PLS SURVEY RF SEPIA F-34 (44-35-12-13) w,~ PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA ECC No. Run ~ 1 5618.03 Run # 1 Run ~ 1 Run $ 1 1539.03 Run ~ 1 1539.02 Run Run ~ 1 6181.01 Run $ 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: Please s~&,n ~nd ~tu~n Petroteehnleal Data Center BP Exploration (Alaska) Ine 900 East Benson Boulevard ~choraEe, Al~ka ~508 JU~ 7 4 199~ Oil & Eeeetved by ~ De~,e ~ ~ ~ STATE OF ALASKA ' ' A~KA OIL AND GAS CONSERVATION COMMIS~,..~I REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Perforate X Repair well Other X 1. Operations performed: Operation shutdown Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564' SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889' NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906' NSL, 861' EWL, SEC. 29, T11N, R14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 80.03 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-20 (14-29-11-14) PBU 9. Permit number/approval number 82-168 / 10. APl number 50- 029-20842 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural - Conductor 110 Surface 2642 Intermediate 9153 Production -- Liner 1107 Perforation depth: measured 10047 feet BKB 9252 feet 9907 feet BKB 9118 feet Plugs (measured) Junk (measured) Size Cemented 20x30 9 c. y. 13 3/8 3720 c.f. 9 5/8 1375 c.f. 7 381 c.f. 9748'-9758', 9800'-9818', 9825'-9838' fill at 9907' (06/88) Measured depth True vertical depth BKB 146 146 2678 2678 9189 8440 8933-10040 8207-9245 Squeezed off: 9696'-9748', 9770'-9790' true vertical subsea 8886'-8972' (three intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 9 5/8' Baker packer at 8848~ 5 1/2" SSSV at 2169' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1821 17812 0 0 / 1000 / 2916 96 0 2O40 222 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. i hereby,certify that the forecjoing is true and correct to the best of my knowledge. Signec~_/~l~,}~ '~/('~ Title SeniorTechnicalAssistant, Form 10--~0~4-Rev 06/15/88 // Date SUBMIT IN DI,~'i~IG/'ATE 7/07/92 7/07/92 WELL B-20(14-29-11-14) NRWO/Reperf A NRWO was performed using the following fluids: 435 bbls SWTR to Load Well 205 bbls SWTR Cool Sump 5 bbls FW(Preflush) 24 bbls EDTA (Preflush) 12 bbls FW(Spacer) 20 bbls Cement 12 bbls FW(Spacer) 40 bbls SWTR(Displacement) 188 bbls SWTR(Reverse Out) 22 bbls PW(Jet Pass) 32 bbls SWTR(Jet Pass) 34 bbls Recovered(Sweep Gas Displacement) 35 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 9884' 490 bbls load fluid behind pipe(Cumulative Approximate Total Load Fluid Behind Pipe is 245 bbls) 16 bbls Cement Recovered(Does Not Include Cement not pumped) EDTA:.I 8% PPT EDTA,.18 PPT KCL, 16% MUSOL,.S%LS-300 CEMENT: 1S.S PPG CLASS G CEMENT CONTAINING, .2% CFR-3, .4% HR-12, .18 GAL/SK HALAD-344L SQ.Z #~ A NRWO was performed using the following fluids: 356 bbls SWTR to load well/cool sump 5 bbls FW(Preflush) 17 bbls Cement 15 bbls FW(Spacer) 37 bbls SWTR 168 bbls SWTR(Live Reverse Out) 24 bbls Duo Polymer(Jet Pass) 34 bbls SWTR(Jet Pass) 90 bbls Recovered(Final Reverse Out and N2 Displacement) Well Cleaned Out to 9884' 10 bbls load fluid behind pipe(Cumulative Approximate Total Load Fluid Behind Pipe is 500 bbls) 14.5 bbls Cement Recovered(Does not include cement not pumped) CEMENT: 15,5 PPG CLASS G CEMENT CONTAINING, .2% CFR-3, .4% HR-12, .2 GAL/SK HA .LAD-34_4.Lo saz,2 R~.F.W ED Alaska Oil & G~s Gons. Gomm~ss'~on PAGE 2 7/10/92 7/21/92 WELL B-20(14-29-11-14) A NRWO was performed using the following fluids: 208 bbls SWTR to Load Well 5 bbls FW 5 bbls ACID 5 bbls FW 30 bbls SWTR w/Surfactant (Overflush) 232 bbls SWTR to Cool Sump 5 bbls FW(Spacer) 17 bbls Cement 5 bbls FW(Spacer) 45 bbls SWTR(Displacement) ! 70 bbls SWTR(Reverse Out) 16 bbls GEL(Jet Pass) 38 bbls SWTR(Jet Pass) 90 bbls Recovered(Backflow displacement/final reverse out) Well Cleaned Out to 9880' 40 bbls load fluid behind pipe(Cumulative Approximate Total Load Fluid Behind Pipe is 540 bbls) 15 bbls Cement Recovered(Does Not Include Cement not pumped) ACID:.15% HCL, .1% LOSURF 300, .2% HAI-85, 45 PPT FERCHEK-A CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2% CFR-3, .35% HR-12, .20 GAL/SK HALAD-344L so_z #3 The following interval were reperforated using 3 3/8" guns, 4 SPF, 60° orientation and 120° phasing. 9800'- 9818' MD 9825'- 9838' MD fjh 12/13/92 Gas ConS. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE- 08/10/93 T# 84863 BPX/PBU LOG'S · Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-09~1-O? PRODUCTION LOG 08/02/93 #1 B-0270~zo PRODUCTION LOG 08/01/93 #1 B-06U~-?~ PRODUCTION LOG 08/06/93 #1 B-071~'~ PRODUCTION LOG 08/02/93 #1 B-20~'{~ PRODUCTION LOG 08/06/93 #1 S-037~q DTL 08/04/93 #1 H-21A~'75 PgODUCTION LOG 08/01/93 #1 Z-12 %~0L PFC/~i~E~ 08/06/93 #1 Z-141~-~.. PFC(G~[cc~ 08/06/93 #i Z-32~9~ CCL ( ~ 08/07/93 #1 10250 8950 11500 9500 8800 8800 10300 9600 9250 00- 9750.00 ATLAS 5 " 00-10562 00 ATLAS 5 " 00- 9200 00-11716 00- 9830 00- 9200 00- 9300 00-11330 00-10192 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS .5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 9800 00-10110 00 ATLAS 5 " Information Control Well Records RECEIVED AUG I ? 199S Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/24/92 T# 83755 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~~'/~COMPLETION 07/21/92 #1 W-20 CNL 07/19/92 #1 CNL 9500.00- 9876.00 SCH 9350.00- 9806.00 SCH 10328.00-10787.00 SCH 5 " 5 " Information Control Well Records Adrian J. Martin BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 06/30/92 T# 83659 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A_26u~-'//_GAS,9~ LIFT SURVEY 06/05/92 #1 ~ LEAK DET/ 06/13/92 #1 C-20~$-~3 LEAK DET 06/05/92 #1 C-283 ~--/.~' P ROD-F 06/06/92 #1 N-01~:~S' PRODUCTION LOG 06/25/92 ~2 R-24~;~ GAS LIFT SURVEY 06/09/92 ~1 X-2~-~/~' ~' INJ 06/14/92 ~1 X-25~-- ~ GAS LIFT SURVEY 06/03/92 ~1 Y-13~/-//~ PITS 06/26/92 ~1 ~~_~/ SAS ~NmR~ SU~V~/ 5 " ~-20~-/~AS ~N~ SU~W~ 5 " G-25~d'/~AS ENTRY LOG 5 " N-07~/~GAS ENTRY SURVEY 2/5" 2500.00-10560.00 CAMCO 5600.00- 5950.00 CAMCO 8400.00-11350.00 CAMCO 10800.00-11000.00 CAMCO 8700.00- 8975.00 SCH 3200.00- 9507.00 CAMCO 11250.00-11830.00 CAMCO 0.00-10300.00 CAMCO 10350.00-10688.00 SCH 06/04/92 #1 2/5" 5 " 5 " 2/5" 5 " 2/5" 5 " 8950.00- 9148.00 CAMCO 06/04/92 #1 9600.00- 9860.00 CAMCO 06/03/92 #1 10300.00-10500.00 CAMCO 06/14/92 #1 0.00-10575.00 CAMCO Information Control Well Records Adrian J. Martin . R EiVED JUL 1 4 1992 Alaska Oil & Gas Cons. CmmmissJon Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (90';) 561-5111 RECEIVED OCT 18 1991 ~ AJaska 0il & Gas Cons. Commission Anchorage aP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well , Records at (907) 564-4004. . DATE: 10/10/91 T# 82910 ~!~ PITS 09/20/91 ~1 10860.00 PITS 09/07/91 ~1 10800.00 91-if Y-30~"~ CCL 09/16/91 ~1 8650.000 ~0-~ Y-2'9c'~ CCL 09/16/91 #1 10131.00 ~3-3~_N-19~ CCL 09/25/91 #1 9000.000 ~-~W-38/ GAS LIFT SURVEY 09/15/91 #1 200.0000 ~LIT&B-21'~' PROD-F 08/13/91 #1 9550.000 ~1-90 Y~26~- GAS LIFT SURVEY 09/16/91 #1 5400.000 ~-30 X-26~ INJ 09/24/91 #1 9150.000 %~-05~ CL 09/07/91 #1 9100.000 ~9-~-06~' INJ 09/11/91 #1 9800.000 %~-~h02AU/ PROD-F 08/24/91 #1 11000.00 Fg-f~W-09/ GR 09/11/91 91 14200.00 ?~-&~E-03/ PROD-F 09/25/91 #1 12450.00 9o-~ W-16u/ LEAK DET 09/19/91 91 2000.000 ~-i~R-22/ PROD-F 08/20/91 #1 10350.00 q/-~O B-32u/' TEMP 09/15/91 #1 10275.00 ~-o7C-04~ PROD-F 08/24/91 #1 10350.00 ~-17~G-26~ CL 09/04/91 #1 10200.00 ~B-20J LEAK DET 08/23/91 #1 7992.000 ~-I~P-20 / LEAK DET 08/23/91 #1 11800.00 7~ R-04~.. GAS LIFT SURVEY 09/04/91 ~1 3200.000 r~-gJOH-18~ PROD-F 09/25/91 #1 9250.000 ~'-99 W-37~ PROD-F 09/15/91 ~1 9800.000 ~-l~$-0'5~ CL 09/15/91 ~1 9500.000 ¥~-~F-2~ TEMP 09/03/91 ~1 11800.00 \~M-16 ~' PROD-F 08/26/91 #1 10850.00 08/26/91 ~1 2500 000 %,$~R-04J' GAS LIFT SURVEY . ~/-G~ B-32~ INJ 09/06/91 ~1 10240.00 ~,¥0W-26~ JEWELRY LOG 08/22/91 #1 CAMCO 5 ~-!~ W-11~ JEWELRY LOG 08/21/91 #1 CAMCO 5 CAMCO 5 08/23/91 10900. 12550. 9950.0 11444 . 00 CAMCO 5 11140 . 00 CAMCO 5 9240 . 000 CAMCO 5 12500 . 00 CAMCO 5 9755. 000 CAMCO 5 4000. 000 CAMCO 2 98~0.000 CAMCO 5 10986.00 CAMCO 5 9680 . 000 CAMCO 5 10941.00 CAMCO 5 10279.00 CAMCO 5 11480 . 00 CAMCO 5 15162.00 CAMCO 5 12685.00 CAMCO 5 11270 . 00 CAMCO 2/5 10720 . 00 CAMCO 5 10953 . 00 CAMCO 5 10660 . 00 CAMCO 5 10522.00 CAMCO 5 9062. 000 CAMCO 5 12553.00 CAMCO 5 8639.000 CAMCO 5 9722. 000 CAMCO 5 10100 . 00 CAMCO 5 10224 . 00 CAMCO 5 12175.00 CAMCO 5 11150 . 00 CAMCO 5 9821. 000 CAMCO 2/5 10807 . 00 CAMCO 5 00 11758.00 00 13284.00 00 10120.00 BP EXPLORATION BP Exploration (Alaska) Inc. '900 East Benson Boulevard Re. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :06/12/90 T#:81265 FROM: Information Control .. Well Records LR2-1 .~ :.. · ~ ,, SUBJECT: BP CASED HOLE FINALS ,:. · · · Enclosed is your copy of the material listed below. If you i~ave any questions, please contact BP Well Records at (907) 564-4445. · B-20 TDT-P 06/08190 #1 "?9550-9690 Sch 5" F.,~.4 TDT-P 06~07~90 #1 ¥0125-10350 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR JUN Alaska 0il & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 20, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-20 (14=29-11-14). PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. B. J. Policky, S~ervisor Waterflood & Miscible Flood BJP: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIVED FEB 2 1990 Alaska Oil & Gas Cons. Corm~llat~on Anchora~ · /"', STATE OF ALASKA · SKA OIL AND GAS CONSERVATION COMMI~-olON REPORT OF SUNDRY WELL 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564'SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889' NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906' NSL, 861' EWL, SEC. 29, T11N, R14E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB Alter casing 10047feet 9252feet 9907feet 9118feet Repair well 5. Type of Well: Development X Exploratory Stratigraphio Service Plugs (measured) Other 6. Datum elevation (DF or KB) KBE, 80.03 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-20 (14-29-11-14) PBU 9. Permit number/approval number 82-168/90-031 10. APl number 50- 029.20842 11. Field/Pool Prudhoe Oil Pool Junk(measured) fill at 9907' (06/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth .. 110 20x30 9 c. yo 146 2642 13 3/8 3720 c.f. 2678 9153 9 5/8 1375 c.f. 9189 .. 1107 7 381 c.f. measured 9748'-9758', 9800'9818; 9825'-9838' True vertical depth BKB 146 2678 8440 8933-10040 8207;9245 Squeezed off: 9696'-9748', 9770'-9790' true vertical subsea 8886'-8972' (three intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 9 5/8" Bakerpacker at 8848'; 5 1/2" SSSV at 2169' RECEIVED 14. Intervals treated (measured) FEB 2 ]990 Treatment description including volumes used and final pressure Alaska 011 & Gas Cons, ~mmission Reoresentative Daily Average Production or Injection Data AuuJlul~J OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 910 920 80 0 199 Subsequent to operation 4600 6220 100 0 263 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X'- Oil X Gas Suspended . J17. I hereby ce~y that the f~:egpi~ tr~l~nd correct to the best of my knowledge. Signed,~~~,~'_J~~~. Title Form 10-404 Rev 06~1~/88 J Service Supervisor Watedioed/Miscible Flood Date SUBMIT IN DUPI~ICAI WELL B.20 (14.29.11.14~ PBU ~ADDtL. PERFORATION OPERATIONS The following additional interval was perforated February 12, 1990, using Schlumberger 3 3/8" carrier guns at 4 spf: 9748'- 9758' MD BKB Ref. BHCS 11/21/82 A lubricator was installed and tested to 3500 psi for all well work. Thc well was returned to production immediately following perforating operations, then tested. (NOTE: The interval perforated is 4' shallow to proposed interval after an error in the PETROS database was found compared to the actual BHCS log.) jm 2/19/90 BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-66t2 (907) 561-5111 To: Distribution Date: 02/16/90 Transmittal: 80905 From: Information Control Well Records LR2-1 Subject.: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you questions, please contact BP Well Records at (907) 564-4445. A-23 PROD-F 02/11/90 #2 10200-11710 Sch B-20 COMP & JEWELRY 02/12/90 41 8658-9838 Sch C-10 TUBING PUNCHER 02/11/90 #1 10046-10275 Sch N-10 PROD-F 02/12/90 #1 9980-10600 Sch have any 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOBIL PHILLIPS RESERVOIR ....... ARCHIVES Alaska Oil & Gas Cons. Commissi0.~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 15, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-20 (14-29-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very t~l~~/ Supervisor Waterflood/Miscible Flood BJP: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RECEIVED STATE OF ALASKA /'~SKA OIL AND GAS CONSERVATION COMb,. jIoN APPLICATION FOR SUNDRY APPROVALS IGINAL 1. Type of Request: Abandon Suspend Alter casing ~ Repair well .. Change approved program 2, Name of Operator BP Exploration (Alaska) Inc. 3, Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564'SNL, 1895[ WEL, SEC,. 31, T11N, R14E, UPM At top of productive interval 815'NSL, 667'EWL, SEC. 29, T11N, R14E, UPM At effective depth 889' NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906' NSL, 861' EWL, SEC,. 29, T11N, R14E, UPM 12. Present well condition summary Total depth: measured 10047 feet true vertical BKB 9252 feet Operation Shutdown ._ Re-enter suspended well Plugging '" Time extension Stimulate Pull tubing Variance ~ Perforate X Other 5. Type of Well: 6. Datum elevation (DF or KB) Development x KBE - 80.03 AMSL feet Exploratory Stratigraphlc Service 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-20 (14-29-11-14) PBU 9. Permit number 82.168 10. APl number 50. 029-20842 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 9907 feet true vertical BKB 9118 feet Junk(measured) fill at 9907° (06/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20x30 9 c.y. 146 Su dace 2642 13 3/8 3720 c.f. 2678 Intermediate 9153 9 5/8 1375 c.f. 9189 True vertical depth BKB 146 2678 8440 Production -- Liner 1107 7 381 c.f. 8933-10040 8207-9245 Perforation depth: measured 9800'-9818', 9825'-9838' true vertical subsea 8935'-8972' (two intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Squeezed off: g696'-g757', g770'-g790' RECeiVeD Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 8848'; 5 1/2" SSSV at 2169' 13. Attachments Description summary of Proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation January 1990 16. If proposal was verbally approved Name of approver 17. I hereby Date approved 15. Status of well classification as: Oil X Gas Suspended. Service to the best of my knowledge. Conditions of approval: Notify Plug integrity BOP Test , Mechanical Integrity Test Approved by order of the Commission Form 10-403 Rev 06/15/88 Title FOR COMMISSION USE ONLY so representative may witness Location clearance 'Subsequent form required 10~ ' Watediood/Miscible Flood Date I ¢-'4-7/ SUBMIT IN TRIPLICATE WELL B.20 ¢14-29.~1.~4~ PBII ADD'L. PERFORATION PROPOSAL Wc propose to perforate the following additional interval during January 1990' 9752' - 9762' MD BKB Rcf. BHCS 11/21/82 A lubricator will be installed and tested to 3500 psi for all well work. Thc well will be returned to production immediately following perforating operations, then tested. jm 1/12/90 FLOW TUBES & PACKOFF BOWEN PAC~OFF GREASE SEAL FLOWTUBE PUMP FLOWLINE FLOWLINE VALVE GREASE LINE RISER GREASE / ~ MANIFOLD GREASE PUMP ..-GREASE RESERVOIR BOP BP EXPLORATION May 22, 1989 O R I G i itI BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-20 (14-29-11-14) PBU Gent lemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a stimulation of the well. Yours very truly, JAM: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File · · ' /~', STATE OF ALASKA ~ .~KA OIL AND GAS CONSERVATION COMMI~ ~ ...)N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate ,L Pull tubing Alter casing, Repair well Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) BP Exploration (Alaska) Inc. Developmen! .~_ KBE - 80.03 AMSL feet Exploratory 3. Address Stratigraphio 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 service Prudhoe Bay Unit 4. Location of well at surface 8. Well number 564' SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM B-20 (14-29.11-14) PBU At top of productive interval 9. Permit number/approval number 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM 82-168/9-186 At effective depth 10. APl number 889' NSL, 827' EWL, SEC. 29, T11N, R14E, UPM 50- 029-20842 At total depth 11. Field/Pool 906' NSL, 861' EWL, SEC. 29, T11N, R14E, UPM Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 10047feet Plugs (measured) true vertical BKB 9252feet Effective depth: measured 9907feet true vertical BKB 9118feet Junk(measured) fill at 9907' (06/88) Casing Length Size Cemented Structural -- Conductor 110 20x30 9 coy. Surface 2642 13 3/8 3720 c.f. Intermediate 9153 9 5/8 1375 c.f. Production -- Liner 1107 7 381 c.f. Perforation depth: measured 9800'.9818', 9825'-9838' Measured depth True vertical depth BKB 146 146 2678 2678 9189 8440 8933-I0040 8207.9245 Squeezed off: 9696'-9757', 9770'-9790' true vertical subsea 8935'-8972' (two intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 I/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 95/8" Bakerpacker at 8848'; 5 1/2" S$SV at 2169'R E C E IV E ~ 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure MAY 3 ! ].fiS-$ Anchorage 14. Reoresentative Daily Average Produ~jon or In!eetion Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 690 189 12 0 212 Subsequent to operation 1020 382 115 0 216 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil X Gas Suspended Service "17. I hereb~ certify that the foreEioing is true and correct to the best of my knowledge. Signed-'/'~,~~'"' ~. ~ Title Manager Production Engineering Form~4 Rev 06/15/88 SUBMIT IN DUPLICATE WELL B.~0 (14.29.11.14] PBU STIMULATION OPERATIONS A selective mud acid treatment was performed May 4, 1989 on the following perforated intervals in Well B-20. 9800' - 9818' MD BKB 9825' - 9838' MD BKB The treated intervals were isolated from upper squeezed intervals by setting an inflatable packer at 9795' MD BKB. The following fluids were pumped down coiled tubing. a) b) c) d) e) 36 bbls. 15% HCI w/OSR divener 24 bbls. Arctic diesel wi10% mutual solvent Unseated packer and reciprocated across perfs 24 bbls. Arctic diesel w/10% mutual solvent Displaced to perfs with 34 bbls. produced water The well was returned immediately to production, then tested. jam 5/16/89 BP EXPLORATION March 7, 1989 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-20 (14-29-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, ~;~~eering JAB:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter c,a~ing Repair well Change approved program 2. Name of Operator' BP Exploration (Alaska) Inc. 3. AddreSs P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 564' SNL, 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889'NSL, 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906'NSL, 861'EWL, SEC. 29, T11N, R14E, UPM 12'. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Operation Shutdown Plugging Pull tubing Variance 5. Type of Well: Development Exploratory Stratigraphic Service Re-enter suspended well Time extension Stimulate X Perforate Oth~ 6. Datum elevation (DF or KB) KBE., 80.03 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B.20 (14-29-11-14) PBU 9. Permit number 82-168 10. APl number 50- 029.20842 11. Field/Pool Prudhoe Oil Pool 10047 feet BKB 9252 feet Plugs (measured) 9907 feet BKB 9118 feet Junk (measured) fill at 9907' (06/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20x30 9 c.y. 146 Surface 2642 13 3/8 3720 c.f. 2678 Intermediate 9153 9 5/8 1375 c.f. 9189 Production -- Liner 1107 7 381 c.f. Perforation depth: measured 9800'.9818', 9825'-9838' True vertical depth BKB 146 2678 8440 8933-10040 8207-9245 Squeezed off: 9696'-9757', 9770'-9790' true vertical subsea 8935'-8972' (two intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) g 5/8" Baker packer at 8848'; 5 112" SSSV at 2169 ..... , ,,-- 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation J 15. Status of well classification as: March 1989 16. if proposal was verbally approved Oil X Gas __ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned ~ ~'~/t,~j~ Title Manager Production En~lineerin~l /// ' {/U FOR COMMISSION USE ONLY Condit~,~ ~fh,a~l?,,r+o~,v~,,Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~F~ved Copy ' 'Returned_ ORIGINAL SIGNED BY Approved by order of the Commission ! ll~NIF C. SMITH ~----~ioner :orm 10-403 Rev 06/15/88 Suspended SUBMIT IN TRIPLICATE B-20 HCL ACID TREATMENT WITH CTU PKR 1. RIH with slickline and run a drift to ensure no obstruction exists in wellbore and to tag PBTD. Do not perform acid'job unless 50' of rathole exists. 2. Obtain wellhead sample. Test for emulsion tendencies using. API RP 42 testing procedure with spent and unspent acid. Acid system to contain 5000 ppm ferric iron. Adjust additives as required. 3. Obtain rate test at the same choke setting that will be used for the post rate test. 4. Pull SSSV and isolate SSS. · 5. MIRU CTU and stimulation company. Lay lines and pressure test to 4000 psi. 6. Sample acids to insure acceptable concentration and that iron count is less than 350 ppm. 7. RIH with Lynes 130 rib inflatable packer and tie into tubing tail for depth control. The 130 rib tool has less chance of failure if set in perfs. As target interval is only 10 ft. some perfs may be covered when packer is set. Preference is to err towards the high side instead of covering perfs in the lowest interval. 8o Set packer in the 10 ft blank interval between 9790 and 9800'. Pressure annulus to 500 psi and hold at this level during job. However, if behind the pipe communication is observed on the backside, began pumping down the annulus at 1/2 BPM. As no open perfs exist on the backside objective is to hold pressure without breaking squeeze down. If perfs do fail from the acid, pumping down the backside will at that time minimize perf exposure to acid. Do not bullhead wellbore fluids into interval being acidized. 9o Acidize 23' (92 holes) of Zone 2 perfs with 15% HCL acid. Maximum pressure is 4000 psi. Filter fluids to 3 microns. Pump as follows: A) 1500g 15% HC1 with 1.0 ppp OSR. B) 500g arctic diesel with 10% mutual solvent. C) Unseat packer and reciprocate across perfs. D) 500g arctic diesel with 10% mutual solvent. E) Displace to perfs with sea or produced water. 10. POOH while pumping diesel. 11. Return well to production ASAP. 12. Obtain rate test at same choke size as pretreatment setting. B-20 HCL mat/February 24, 1989 Coiled Tubin~ Blow-Out-Preventers Coiled Tubing · , Pack-Of;~ Blind Rams Cutter Rams Chlck:san (Kill Llne) Slips 'Pipe Rams .Pump-ln Sub (Clrc ula te/R e turn s) W ell Head --~"l_.~' Swab Valve Standard Alaska ~/~x, Production Compa 900 East Benson Bou,~.¢ard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION September 30, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well'B-20 (14,29,11 14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, JAB:JAM Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/lO B-20 Well Flle Bragg er Production Engineering RECEIVED OCT 0 ~ 19811 , ~ Anchorage A unit of the original Standard Oil Company Founded in Cleveland Ohio in 1870. 1 Operation performed: . , STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter casing [] Other [] Name of Operator Standard Alaska Production Company Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface 564'SN1., 1895[ WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 815'NS1_, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 889'NS!., 827' EWL, SEC. 29, T11N, R14E, UPM At total depth 906' NSL, 861' EWL, SEC. 29, T11N, R14E, UPM 5. Datum elevation (DF or KB) KBE = 80.03 AMSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number B-20 (14-29-11-14) PBU 8. Approval number 8-402 9. APl number 5 0- O29.20842 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: 'measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 10047 feet true vertical BKB 9252 feet measured 9907 feet true vertical BKB 9118 feet Length Size .. 110 20x30 2642 13 3/8 9153 9 5/8 ._ 1107 7 measured 9800'9818', 9825'9838' true vertical subsea Plugs (measured) Junk (measured) fill at 990 7' (06/88) Tubing (size, grade and measured depth) Cemented Measured depth True Vertical depth BKB 9 c. yo 146 146 3720 c.f. 2678 2678 1375 c.f. 9189 8440 8933-10040 820 7-9245 Squeezed off: 9696'-9757', 9770'9790' 8935'8972' (two intervals) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary 9 5/8" Bakerpacker at 8848'; 5 1/2" SSSV at 2169' . see attachment Intervals treated (measured)' 0C,_,~' Treatment description including volumes used and final pressure ~'~ ,,--'- ~.~St, a 0~[ &GaS Representative Daily Average Production or Injection Data Prior to well operation Subsequent to operation OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1310 3408 3 0 1888 1720 2656 58 0 263 4. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge ~, .5'---o7~-' o~ Form 1~)~14 Rev. 12-1-85 (J" Tit l e Manager Production Engineering Date~.,~. ~/' Submit- ih' Duplicate WELL B-20 (14-29.11-14~ PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as detailed below: 5/23/88 Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi. Performed mud acid perforation wash and sump cleanout. 5/25/88 Performed a cement squeeze on existing perforations. Contaminated cement; WOC. Reversed out after 24 hours and tested squeeze. 6/18/88 Perforated the following additional intervals using Schlumberger 2 7/8" carrier guns at 4 spf: 9800' - 9818' MD BKB (8935' - 8953' TVDss) 9825' - 9838' MD BKB (8959' - 8972' TVDss) Returned well to production and tested. jm 9/28/88 Sfanda,d Alaska P, oduc6on tampat 900 Eas! Benson P.O. Bo~ 196612 Anchorage. Alaska 99.519-66 (9071 564-.5 i I ! DALLAS INDEXED TO: ARCO CHEVRON EXXON TEXACO ~0~iL PHILLIPS STATE OF ALASKA STANDARD ALASKA PRODUCTION Date: 06/30/88 TI: 79037 GEOSC IENCES RESERVOIR REFERENCE: ARCHIVES .. SAPC CASED HOLE FINAL LOGS The follgwlng material ts being submitted herewith. Please acknowledge recelp? by slgning a copy of this let?er and returning i? to this offlce: A-23 B-20 C-03 R-06 ,. CCL 06/18/88 Completion Record Completion Record CCL/Perf Record 06/18/88 06/15/88 #1 .. 10396-10604 Sch 5" #1 9490-9870 Sch 5" #1 9638-10132 Sch 5" '9695-10010 Sch 5" Race i ved _ Date A u-~t of the o,~g;~ol $~ondard C);I Co~pon,/ Founded in Cle,~el~d. Ohio. in 1870. Jennifer Dietz I NFORPAT I ON CONTROL We I I Records LR2- I Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION May 18, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-20 (14-29-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and~erforation of the well. /~{/ Yours very truly, JAB .' JAM ~ Enclosures (9) cc: J. L.--Haas (MB12-1) B-20 Well File ~F/ A. Bragg ~J anager Production Engineering RECEIVED MAY 1 ~; ~978 Oil & Gas Cons. Commissiorl Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS · Type of Request: Abandon I-! Suspend I"i Operation Shutdown E! Re-enter suspended well I'1 Alter casing El Time extension El Change approved program El Plugging [] Stimulale D Pull tubing FI Amend order [] Perforate [] Other 2. Name of Operator Standard Alaska Production Company Address P. O. Box 196612, Alaska 99519-6612 564'SN1., 1895[ WELo SEC. 31, T11N, R14E, UPM At top of productive interval 815' NSL, 667' EWL, SEC. 29, T11N, R14E, UPM At effective depth 890'NSL, 830' EWL, SEC. 29, T11N, R14Eo UPM At total depth 906'NSL, 861' EWL, SEC. 29, T11N, R14E, UPM 5. Datum elevation (DF or KB) KBE,, 80.03 AMSL feet S. Unit or Property name Prudhoe Bay Unit 7. Well nUmber B-20 (14-29-11-14) PBU EL. Permit number 82.168 APl number 0 - 029-20842 10. Pool Prudhoe Oil Pool 1. present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production~, Liner Perforation depth: true vertical measured true vertical Length .. 110 2642 9153 10047 feet BKB 9252 feet 9920 feet BKB 9130 feet Size Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth BKB 9 c.y. 146 146 3720 c.f. 2678 2678 1375 c.f. 9189 8440 20x30 133/8 95/8 .. ,,o, measured 9696;9757: 9770;9790' [~ ,~' C ~ IV E D true vertical subsea 8034'-8926' (two intervals) Tubing (size, grade and measured depth) 5 1/2"L-80 to 8848'with 4 1/2"tailpipe to 8996' A[ask~ 0il & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 8848;' 5 1/2" SSSV at 2169' 12. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation 1988 4. If proposal was verbally approved Name of approver t15. I hereby certify that the foregoing is true and correct to the best of my knowledge Si~ned'.A ~'~ ,~~/~,/~ Title Mana~ler Production Engineering J~'~ ~U Commission Use Only Date approved Conditions of approval Notify commission so representative may witness IApproval No. [] Plug integrity' [] BOP Test C! Location clearanceI ~---~'~ 7r ~"'~- Approved C~opy Returnee ~ ORIGINAL SIGNEO BY ~ ~"'"'~'"~J by order of A~roved by LONNIE C. SMITH Commissioner the commission Date~~-~ :erin 10-403 Rev 12-1-85 Submit ~ triplicate WELL B-20 CTU CEMENT SQUEEZE WORKOVER The following proposed CTU cement squeeze workover is to squeeze the existing perforations, which are coning gas from the GOC, and reperforate the well to provide greater standoff from the gas influx sources. The proposed post workover perforation strategy is perforate 9800'-9818', 9820~'-9822' and 9825'-9838' MD BKB and to stage reperforate intervals 9747'-9757' at limited shot density. 1. Rig up coiled tubing unit and pressure test BOP's to 4000 psi. 2- Perform mud acid perforation wash and sump cleanout. 3. Fluid pack the wellbore with produced water. 4. Pump cement with surfactant/mutual solvent pre-flush. 5. Perform cement squeeze on existing perforations. 6. Contaminate cement in wellbore. WOC. 7. Reverse out contaminated cement and test squeeze. 8. Perforate the following intervals at 4 spf: 9800' - 9818' MD BKB (18') 9820' - 9822' MD BKB (2') 9825' - 9838' MD BKB (13') 9. Put well on production and test. If well will not flow then initiate gas lift/ N2 lift. 10. If well cannot sustain flow then perform CTU packer stimulation of the perforated interval. 11. If well cannot sustain flow then stage perforate at limited shot density the following intervals (from the bottom up): 9747' - 9752' MD BKB (5') 9752' - 9757' MD BKB (5') 12. Put well on production and test. Coiled Tubing Blow-Out-Preventers ..,~ Coiled Tubing Pack-Off ) Blind Rams Cutter Rams Chicksan (Kill Line) Slips Pipe Rams ~ ~ ~_. Pump-lnSub (Circulate/Returns) W oil Head Swab Gas Cons. Commiss,~or~ DALL-\S ARCO CHEVRON EX. XON TEXACO HOB!L PHILLIPS t NOEXED STANDARD AL ASKA P~ODUC } I(]N Da*e: 02/12/88 TO: TI: 78547 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A-26 01/27/88 Static Survey GO A-29 01/30/88 " " Camco A-32 01/28/88 " " GO ~,i~O:.": 01/28/88 " " Camco B-29 01/27/88 " " GO C-12 01/31/88 " " Camco C-35 01/31/88 " " Camco G-19 02/01/88 " " GO G-26 01/30/88 " " Camco H-22 01/25/88 " " Camco J-21 01/29/88 " " GO N-22 01/24/88 " " Camco S-18 01/30/88 .... GO U-8 01 /23/88 " " Camco X-2 01/24/88 " " Camco X-7 01/27/88 " " Camco X-27 01/26/88 " " Camco Y-2 O1/09/88 .... Camco Victoria Aldridge INFORI~NTION CONTROL Well Records LR2-1 Stondo,d Alosko Production Compony~ 900 F.o~l 13~n~on Boule~,~., P.O. ~ 196612 Ancho~oge. Alosko ~ 19.66 ~7) 564-51 I I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED .,. STANDARD ALASKA PRODUCTION Dote: 11/18/86 TI: 77525 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to thls offlce: _ B-18 Perf. Record 07/04/86 gl 8650-9250 Sch 5'~ B-20 Perf.zRecord 07/05/86 gl 9530-9854 Sch 5" G-30 CET 08/06/86 gl 8762-9766 Sch 5" G-30 CBT 08/06/86 gl 8672-9743 Sch 5" G-32 CBT 08/27/86 #1 8350-9550 Sch 5" J-1 Tubing Cutter Record 08/23/86 gl 8600-9100 Sch 5" J-19 GCT 07/12/86 gl SURF-1390 Sch 5" J-19 GCT 07/12/86 #2 SU1~'-1772 Sch 5" M-2 'Perf. Record 07/01/86 gl 10000-10334 Sch 5" M-2 Spinner Profile 07/09/86 #1 9695-10300 Sch 5" M-21 Perf. Record 07/04/86 gl 8370-9250 Sch 5" R-I8 Perf. Record 07/06/86 #1 8990-10067 Sch 5" R-23 Perf. Record 07/03/86 #1 11240-12174 Sch 5" S-19 GCT 07/21/86 gl SURF-1498 Sch 5" S-19 CBT 08/13/86 #1 9100-10110 Sch 5" S-20 CBT 08/30/86 #I 8710-9774 Sch 5" Y-24 GCT 07/15/86 gl SURF-13450 Sch 5" Y-24 CBT 07/15/86 #1 12600-13488 Sch 5" '~'~ Oil & Gas CoB. Cmmm!$sjc.q Rece i ved Date A un,t o! ,he ot,g,~ol S,und¢,,d .(~1 C~,-pony fot,,,ded ,n Cl~-.l{,nd. Oh,o. ,,, I~7(! Victoria Aldridge I NFORHAT I ON CONTROL Wel I Records LR2-I _1 Standard Alaska Product,on Company' 900 E:o$! ~'n*.on PO ~. 196612 An(ho~oge. AlonZo (907) ~64.5111 TO: DALLAS ARCO CHEVRON E X_XON TEXACO MOBIL PHILLIPS GEOSCIENCES INDEXED STANDARD ALAS.PA. PR©DUC TION Date: 10/09/86 T~: 77393 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: - CET 03/02/86 #2 11000-11986 Sch 5" CET 03/18/86 #1 9000-9786 Sch 5" CET 03/20/86 #1 9100-9875 Sch 5" CET 03/19/86 #1 10200-11180 Sch 5" CCL/Perf. 09/17/86 #1 9700-10250 GO 5" CCL/Perf~ 09/27/86 #1 9700-9940 GO 5" CBT 03/08/86 #1 8700-9648 Sch 5" CCL/Perf. 09/21/86 #1 7900-9217 GO 5" GCT 06/12/86 #1 32-6711 Sch 5' CCL/Perf. 09/22/86 #1 9402-10657 GO 5" EPL 03/15/86 #3 9350-9850 Sch 5" CBT 03/07/86 #1 8900-9629 Sch 5" CBT 06/24/86 #1 8600-9780 Sch 5" CCL/Perf. 09/23/86 #1-4 10500-10950 GO 5" GCT 04/18/86 '#1 0-10510 Sch 5" Standard Alaska Production Company ~ · 900 Fast Benson Bouleva. RO. Box 196612 Ancharage, Alaska 99519-6612 (907) 564-5111 STANDARD ALASKA PRODUCTION July 10, 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well B-20 (14-29-11-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. PFB:JAM'~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 B-20 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. RECEIVED JUL ~ 4 .I585 A/aS/fa o~! ' 'Chorage :~., STATE OF ALASKA ,.--.,, ALASKA: ~ AND GAS CONSERVATION COMMIe-. .)N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing Alter Casing ~ Other ~ 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 564' SNL, 1895' WEL, Sec. 31, TilN, R14E, UPM At top of productive interval 815' NSL, 667' EWL, Sec. 29, TllN, R14E, UPM At effective depth 890' NSL, 830' EWL, Sec. 29, TllN, R14E, UPM At total depth 906' NSL, 861' EWL, Sec. 29, TllN, R14E, UPM 5. Datum elevation (DF or KB) F, BE = 80.03 6. Unit or Property name Prudhoe Bay Unit Feet 7. Well number B-20 (14-29-11-14) PBU 8. Approval number 194 9. APl number 50--029-20842 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 10047 feet Plugs (measured) 9252 feet BKB Effective depth: measured true vertical 9920 feet Junk (measured) 9130 feet BKB 12. Casing Length Structural -_ Conductor 65 ' Surface 2633" Intermediate 9144 ' Production __ Liner 1107' Size Cemented Measured depth True Vertical depth 20"x30"' 9 cu .yds. 110 ' 110 ' 13 3/8" 3720 c.f. 2678' 2678' 9 5/8" 1375 c.f. 9189' 8440' 7" 381 c.f. 8933'-10040' Perforation depth: measured 9696' - 9790' (two intervals) true vertical (subsea) 8835' - 8926' Tubing (size, grade and measured depth) 5 1/2" L-80 to 8848' with 4 1/2" tailpipe to 8996' Packers and SSSV (type and measured depth) 9 5/8" Baker' packer' at 8848': 5 1/2"' s.q.qv at 2]69' Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 8207'-9245' RECEIVED J U L 1 4 1986 Alaska Oil & Gas Cons. Commission Anchorage 13. Representative Daily Average Production or Injection Data OiI,Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2050 4149 20 0 1693 Subsequent to operation 2650 3347 26 0 1473 14, Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~-~' ¢ -- ,2.0--~ '¢ Signed , Title Supvr. Res./Prod. Surveillance I Date ~ Form 10-404 RevY12-1-85 Submit in Dupiica Well B-20 (14-29-11-14) PBU ADDITIONAL PERFORATING OPERATIONS 7/5/86: Installed and tested lubricator to 3500 psi. Rigged up Schlumberger and perforated the following additional interval using 2 7/8" Hyperdome guns at 4 spf: 9770' - 9790' MD (8906' - 8925' TVDss) All depths are referenced to BHCS/GR, 11/21/82. Put well back on production and tested. RECEIVED J U L 1 ~ 1~86 Alaska OJJ & G~s Cons. Coram,o,~,or~ Anchor~,ge jm 7/9/86 Standard Alaska Production Company 900 East Benson Bouleva P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-511 ! STANDARD ALASKA PRODUCTION June 17, 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well B-20 (14-29-11-14) PBU Gentlemen: Enclosed, in triplicate, is Approvals, for the above-named perforate the well. Form 10-403, Application well. This contains our for Sundry proposal to PFB: JAM ~u Enclosures (9) cc: J. L. Haas (MB12-1) B-20 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, 'in 1870. CEIV D STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMN/-"'~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ,~ Alter casing F~ Time extension C Change approved Program ~ Plugging ~ Stimulate ~.. Pull tubing ~ Amend order ~ Perforate ~ Other 2. Name of Operator - 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 80.03 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 564' SNL, 1895' WEL, Sec. 31, TllN, R14E, UPM At top of productive interval (top Ivishak/Sadlerochit) 815' NSL, 667' EWL, Sec. 29, TllN, R14E, UPM At effective depth 890' NSL, 830' EWL, Sec. 29, TllN, R14E, UPM At total depth 906' NSL, 861' EWL, Sec. 29, TllN, R14E, UPM 11. Present well condition summary Total depth: measured 10047 feet Plugs (measured) true vertical 9252 feet BKB 7. Well number B-20 (14-29-11-14) PBU 8. Permit number 82 -168 9. APl number 50429-20842 10. Pool ~;udhoe Oil Pool Effective depth: measured 99201 feet Junk (measured) true vertical 9130 feet BKB Casing Length Size Structural ,-- Conductor, 65 ' 20"-×30" Surface 2633" 13 3/8" Intermediate 9144 ' 9 5/8" Production __ Liner 1107' 7'" Cemented 9 cu.yds. 3720 c.f. 1375 c.f. 381 c.f. Measured depth 110' 2678' 9189' 8933'-10040' Perforation depth: measured 9696' - 9757' true vertical (subsea) 8835' - 8894' Tubing (size, grade and measured depth) 5 1/2" L-80 to 8848' with 4 1/2''· tailpipe to 8996' Packers and SSSV (type and measured depth) 9 5/8" Baker packer· at 8848'.: 5 1/2"' Otis "RQY" SSSV at 2169' 12.Attachments True Vertical depth 110' 2678' 8440' 8207'-9245' REC/IV;D JUN 2 0 Description summary of proposal [] Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation June/July. 1986 14. If proposal was verbally approved Name of approver Date approved 1.5. I hereby certify th~ the foregoir~ is true and correct to the best of my knowledge ~ ~"(, /~~ Title Su~vr. Res./Prod. Surveillance IDate P. F. Berth Commission Use Only Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative may witness I Approval [] Plug integrity [] BOP Test [] Location clearanceI NO. /?',/ by order of Commissioner the commission Date Submit in triplicate Well B-20 (14-29-11-14) PBU ADDITIONAL PERFORATING PROPOSAL We propose to perforate the following additional interval in Well B-20 during June/July 1986 at 4 spf: 9770' - 9790' MD (8906' - 8925' TVDss) Ref. BHCS/GR, 11/21/82 A lubricator will be installed and tested to 3500 psi for all well work. The SSSV will be removed prior to perforating and reset after the job at 2169'. jm 6/17/86 R C[IVED JUN 2 o Oil & Gas Cons. BASIC SYSTEM MAKEUP BOWEN PACKOFF' Li- HAND PUMP GREASE SEAL FLOWTUBE F'LOWLINE GREASE LINE FLOWLINE VALVE )/~ G~(~] REASE MANIFOLD RISER "-'"'--=--- REASE ~1 RESERVO{R BOP CEIVED JUN 2 0 !.~8~ Gas Cons, SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE 1907l 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 To: SFO/UNIT/STATE: GETTY (-Marathon) MOBIL Date: 2-29-84 PHILLIPS STATE OF AK BPAE (Transmittal 0nly) CENTRAL FILES (CC#' s-Transmit tal 0nly) ~O~_ED HOLE FINAL LOGS following being acknowledge receipt by signing a The material is submitted herewith. Please copy of this letter and returning it to this office:- CC#: 75074 SFO/UNIT/STATE: ~B~2!~? TDT-M 11-28-83 #1 9300-9904 Sch 5" B-21~'- TDT-M 11-29-83 #1 9250-10138 Sch 5" C-23 r'~"TDT-M 11-27-83 #1 9500-13298 Sch 5" C-24~- TDT-M 11-26-83 #1 9650-10576 Sch 5" D-18~- TDT-M 11-24-83 #1 10400-11364 Sch 5" D-20 ~ TDT-M 11-23-83 #1 9450-10440 'Sd] 5" D-23-~ TDT-M 11-25-83 #1 9700-10537 , Sch 5" (4/82) 19 Ala,~ 0il & Gas Cons. Commiss~ Carolyn Bishop Development Geology Well Records 4182) SOHIO ALASKA PETROLEUM COMPANY 311 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265.0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 SFO ARCO TO EXXON PHILLIPS ?STATE OF AK CENTRAL FILES (CCt/'s - Transmittal Only) REFi~RENCI~ ' : -- Date: 1-9-84 CC#:74960 SOHIO~qETIC LIS TAPES AND LISTINGS lowing material is being submitted herewith. Please acknowledge receipt by signing copy of this letter and returning it to this office:-- SFO/UNIT/STATE: Tape pos. ~-V~ S~i 68865 02791 11-18-83 Run 9 .., T[Yi~LIS SCH 68834 02787 11-28-83 Run 1 ~NL SCH 68841 02788 12-03-83 Run 1 TDT-LIS SCH 68832 02786 11-27-83 Run 1 TDT-EDIT SCH 68830 02785 11-26-83 Run 1 ~qL SCH 68864 02790 11-17-83 Run 11 TDT-LIS SCH 68836 02781 12-03-83 Run 1 TDT-LIS SCH 68826 02782 11-24-83 Run 1 TDT-LIS SCH 68824 02783 11-23-83 RUN 1 TDT-LIS SCH 68828 02784 11-25-83 Run 1 ~L S~{ 68866 02789 11-19-83 Run 1 * SFO & EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm. DATE ............................ ' . . 19 .... Carolyn Bishop Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 November 17, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: -Mr. C. V. Chatterton Gentlemen: Well B-18 (34-30-11-14) PBU and~Q _(14-29-11-14) PBU Enclosed, in duplicate, are Forms 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our subsequents to performing scale inhibitor squeeze treatments on these wells. CJP/J~H/pjw District Petroleum Engineer Enclosures cc: J. D. Hartz Geology Well File #17 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL 2. Na~(e, of, Ope, ra. tor _ 7. Permit No. OhiO A±as~a Petroleum Company 82-168 3. Aq~;JreSs , 8. APl Number ~oucn 6-612, Anchorage, Alaska 99502 50- 029-20842 OTHER [] 4. Location of Well At Surface: 564' SNL, 1895' WEL, Sec. 3l, TllN, R14E., UPM 5. Elevation in feet (ind~ate KB, DF, etc.) KBE = 80.03' AMSL 6. Lease Designation and Serial No. AD.T-, 28310 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-20 (14-29-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A 78 barrel scale inhibitor squeeze treatment was performed over the following interval November 7, 1983. The well was shut-in for 24 hours after the treatment. The SSSV was =emoved prior to stimulation and reset after the job at 2169'. 9696'-9757' BKB (Ref. BHCA/GR, 11-21-82) 14.1 h i t in ist uea dcorrect dr~~ District Petroleum Engineer Signe ~ ~ The s~ce below forOm mission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November 4, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: GJP: : pjw Enclosures Wells B-18 and~g~PBU Enclosed, in triplicate~ are Forms 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our proposals to perform scale inhibitor squeeze treatments on these wells. District Petroleum Engineer cc: J.D. Hartz Geology Well File #17 STATE OF ALASKA '""" ALASKAtOIL AND GAS CONSERVATION ~,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS OTHER 1. DRILLING WELL [] COMPLETED WELL ~ 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Co~nPany 82-168 3. A_AJdress, 8. APl Number tOUCh 6-612, AnchOrage, AlaSka 99502 50- 029-20842 4. Location of Well At Surface: 564' SNL, 1895' WEL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 80.03' AMSL 12. I 6 . Lease Designation and Serial No. A~T, 28310 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-20 (! 4-29-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check ApproPriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate ~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates~ including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A 78 barrel scale inhihi,tor squeeze treatment ~r~ll-.Be.pezfo~ed over the following · . interval during Novemhez/DecemBez, 1983 The. lwelt 'will b.e s~ut-in for 24 hours after the treatment, The' SSSV ~$11 be removefl' Pr$or' to stimulation and reset aftez the job at 2169'. 9696'.-.9757' BK~. ~Re£, BHC~/G'R, Subseq~.ent \Vork ~epo,-~ed 14. I hereb~ify ~ng is true and correct to the best of my knowledge. Conditions of Approval, if any: Approved by iIRIGI~A[ SIGNED Approved Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate TO~ SFO/UNIT/STATE: -. SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY (-Mar a tho n) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only)~ 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MALE: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 8/24/83 CC#: 74673 REFERENCE: ~OHIO CASED HOLE FINAL LOGS .~,lhe material is being submitted herewith. Please acknowledge receipt by signing a following copy of this letter and returning it to this °ffice:-- SFO/UNIT/STATE: B-19 Spinner 7/26/83 #1 9350-9675 Otis 5" B-20 Spinner 7/28/83 #1 9500-9800 Otis 5" R-1 Temp. Survey 8/6/83 #1 9000-9445 Otis 5" (4/82) RECEIVED DATE ......... /'~"f~' ~fl-'-xv¢;'~- ~ ~' ~:' - ....... ,,~ Victoria Aid TP1 ~-~~ , .,~:~, ,,, ,, ridge -5 "' Development Geology -.. , - . ~, ..... .~ ~ , -~,-W~, ..... ' .... Well Records SOHIO'ALASKA PETROLEUM COMPANY SF0 ARCO - CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 9950:2 '~o: SFO/UNIT/STATE: (-Marathon) EXXON GETTY MOBIL PHILLIPS 8/16/83 Date: Trans.#: - CC#: 74652 STATE BPAE (Transmittal Only) _ CENTRAL FILES (CC#'s - Transmittal Only) REFERENCE: Ilowing material is being submitted herewith. Please acknowledge receipt by signing a f this letter and returning it to this office:-- B-18/ Pressure Survey & BHPD 7/18/83 Camco B-19~ " " " " 7/26/83 Otis B-20 ~t " " " " 7/28/83 Otis B-21/> " " " " 7/30/83 Otis B-22J " " " " 7/17/83 Otis / B-23t " " " " 7/16/83 Camco D-16j Static Report 7/27/83 Camco D-21 " " 8/01/83 Camco D-22j " " 8/08/83 Camco D-23 ~/ " " 8/04/83 Camco M-5~' Pressure Survey 8/03/83 Otis X-73 Pressure Survey & BHPD 7/24/83 GO ;./82) RECEIVED DATE Victoria Aldridge Development Geology 'Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO - CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907) 265-0000 MAIL: POUCH 6.612 ANCHORAGE. ALASKA 99502 · o: SFO/UNIT/STATE: (-Marathon) EXXON · GETTY MOBIL PHILLIPS STATE BPAE (Transmittal Only) _ CENTRAL FILES (CC#'s - Transmittal Only)_ 7/26/'83 Date: Trans. #: - 74603 cCtt: REFERENCE: ~O~IO~FINAL DATA- PRESSURE SURVEY DATA /- //~he following material is being submitted herewith. Please. acknowledge receipt by signing a ~./' copy of this letter and returning it to this office:-- BHPD & Pressure Analysis Pressure Survey HP Pressure Analysis Pressure Survey HP Pressure Analysis HP Pressure Analysis BHPD & Pressure BU Survey BHPD & Pressure Analysis BHPD & Pressure Survey BHPD & Pressure Survey Pressure Survey BHPD Pressure Survey BHPD & HP Pressure Analysis Pressure Data 6/01/83 Camco 7/07/83 Otis 7/05/83 Otis 7/09/83' Otis 7/11/83 Camco 7/03/83 Camco 6/25/83 Camco 7/12/83 Otis 7/12/83 GO 7/07/83 Camco 7/08/83 GO 6/6-7/83 Dres 6/20/83 Camco 6/04/83 ~GO 5/18/83 Otis 5/11/83 Otis 5/24/83 Otis 5/22/83 Otis 5/15/83 Camco · 7/07/83 GO ~4 ./82) RECEIVED DATE Victoria Aldridge Development Geology Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 July 21, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well B-20 (14-29-11-14) PBU Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Gjp/j~/P~jw Enclosures cc: J. D. Hartz Geology Well File ~17 ~ Dist~i~ct Petroleum Engineer WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well · OIL I'~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum C0mpan¥ 82-168 ,., '~. Address 8. APl Number Pouch 6-612, AnChorage, Alaska 99502 50- 029-20842 4. Location of well at surface 9. Unit or Lease Name 564' SNL, 1895' WEL, Sec. 31, TllN, R14E, gPM Prudhoe Bay'Unit At Top Producing Interval top of Sag. Ro SST. 10. Well Number B-20 (14-29-11-14) PBU 798' NSL, 627' EWL, Sec. 29, TllN, R14E, UPM At Total Depth 11. Field and Pool 906' NSL, 861' EWL, Sec. 29, TllN, R14E, UP~ ~ Prudhoe Bay Unitl· S. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 80.03' AMSLI ADL 28310 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 11-8-82 11-21-82 11-26-82J feet MSLI one 17, Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD.) 19. Directional Survey I 20, Depth where SSSV set 21. Thickness of Permafrost [0047'MD 9252'TVD 9920'MD 9130'TVD YES~] NO[]I 2169 feetMD 2100' ,, 22. Type Electric or Other Logs Run GR/SP/DIFL/BHCS/CNL/CDL/CAL ~ CBL/VDL/GR/CCL, Gyroscopic survey . 231 CASING, LINER AND CEMENTING RECORD .... SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"x30" InSulate~C0nduCto] Surface 110' 36" 9 cu.yds, concrete .1.3 3/8" 72% L-80 Surface 2678' 17 1/2" 3720 cu. ft. Permafrost II 9 5/8" 47% L-80 Surface ~9189' 12 1/4" 1242 cu.ft. Glass G; 133 Cu". ft. Permafrost C 7" 26% L-80 8933' 10040' 8 1/2" 381 cu. ft. Class C. w/18% salt 24. Perforations open to ProdUction (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD 'i'V'Dss SIZE DEPTH' SET (MD) PACKER SET (MD) 5 1/2" 8848' 8848' Prudhoe Oil Pool Top: 9696' 8835' ~/,4 1/2" tail.pipe 8997' Bottom: 9757 ' 8894 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED "9696' - 9757' BKB (8835' - 8894' T'V'Dss) i . ,,, 27. PRODUCTION TEST DaLe'First Production ~. : '- . I Method of Operation (.FIowing,.gas lift, etc.) 7/1/83J Flowing Date of Test Hours Tested PRODUCTION FO~I OI L-BBL GAs-M~:F WATER-BBL cHoKE SIZE i GAS-OIL RATIO TEST PERIOD I~ I · ,., FlowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL . OIL GRAVITY-APl (corr) 'Press. -~ :. 24-HOUR:RATE I1~', " ..... 28. cOREDATA: ' 1 ., Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · .. None , ECEIFED JUt 2 . · . · ' Naska 0i~ & Gas Cons. Oommissior~ ~ ,Anchorage .... Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE . . 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. . .. BKB Subsea -. Sag. R SST. 9225' 8392' . Shublik"-.. " 9259 ' 8423 ' -. . ivishak - -'9343 ,' 8502, .... ,: · . · . _ /! .. · . 32. I hereby cIrti~ ~g}s true and correct to the best ~f my knowledge Si --,~' Title Distr. Petroleum Data ~ :~' I NSTR uCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in-item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (.GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". STATE Of ALASKA ALASKA . L AND GAS CONSERVATION C ~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 82-168 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20842 4. Location of Well OTHER [] At Surface: 564' SNL, 1895' W-EL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 80.03' AMSL 6. Lease Designation and Serial No. ADL 28310 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-20 (14-29-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate BoX To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] , Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [~ Altering Casing [] r-I Abandonment I-3 [] Other I-'] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals were perforated by Dresser Atlas, using 3 1/8" carrier guns at 4 s.p.f. A lubricator was installed,-and tested to 3500 psi on all well work. 9696' - 9757' BKB (~Ref. BCBA/GR, 11-21-82) An SSSV was set and tested in the ball valve nipple at 2169'. 14. I hereb hat the oing is true and correct to the best of my knowledge: Sign ~ TitleDistrict Petroleum Engineer ThenCe be;ow ~or~mmission us~ Date Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate A C STATE OF ALASKA AL SK IL AND GAS CONSERVATIONC .~MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [~ Workover operation 7. Permit No. , 2. Name of operator Sohio Alaska Petroleum Company 82-168 _ 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20842 9. Unit or Lease Name 4. Location of Well at surface 564' SNL, 1895' WEL' Sec. 31, TllN, R14E, OPM 6. Lease Designation and Serial No. ADL 28310 For the Month of July ,19 83 5. Elevation in feet {indicate KS, DF, etc.) I~]B~.. = 80.03' ANST. Prudhoe Bay Unit 10. Well No, B-20 (14-29-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run i 1S. DST data, perforating data, shows of H2S, miscellaneous data S~e Attached Ala$~a Oii ~.~; ~as C~n~ ~,,.. 17. I , oing is true and corr~t to the best of my know edge. SiGN~~~J (~,~ TITLEDiStr-Petroleum EngineeroArE ~/~/~ ' NO~--~;po;t o~}s form is requ~d for each ~lendar month, regardless of the status of operations, and must be f,led in dbplicat, wi,h the Alaska Oil a~ Conservation Commission by the 15th of the succe~ing month, unless otherwise directed. Form 10-404 ~.v 7.1.R~1 Submit in duplicate PERFORATING DATA - Well B-20 (14-29-11-14) PBU June 16, 1983i Pressure tested tubing and inner annulus. July 1, 1983: Rigged up Dresser Atlas and perforated the following intervals using 3 1/8" carrier guns at 4 spf: 9696' - 9757' BKB (Ref. BHCA/GR, 11/21/82) Put well on production. July 7, 1983: Shut well in to prepare for static pressure survey. July 9, 1983: Ran static pressure/temperature survey at 8800' TVDss. July 19, 1983: Set and tested SSSV in ball valve nipple at 2169'. Well on production. RECEIVED JUL 2 Alaska Oil a Gas Guns. Anchorage SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 May 9, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells B-18 through B-23 and B-25, C-18 through C-28, and D-16 through D-23 (excluding D-19) Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our proposal to perforate these wells. GJP:JLH:pjw Enclosures CC: J. D. Hartz Geology Well File #17 o r very ly, · / G:' j..P~isga kJ _.Dist~_i~>~ Petroleum Engineer E[E VED Gas Cons. Oommissio~ Anshorag~ STATE OF ALASKA ALASKA O;~'XAN D GAS CONSERVATION CO--~AISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. SohiO Alaska Petroleum Company 82-168 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20842 4. Location of Well OTHER [] At Surface: 564' sNL, 1895' WEL, Sec. 31, TllN, R14E, UPM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-20 (14-29-11-14) PBU 5. Elevation in feet (indicate KB, DF, etc.) 6, Lease Designation and Serial No. KBE = 80.03' AMSL ADL 28310 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 11. FieldandPool Prudhoe Bay Prudhoe Oil Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~[ Alter Casing [] , Perforations [] Altering Casing Stimulate 1-~ Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) [] [] o 13. Describe Proposed or COmpleted Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated during June/July, 1983, using 3 1/8" carrier guns at 4 spf. A lubricator will be installed and tested to 3500 psi for all well work. 9696' - 9757' BKB (Ref. BHCA/GR, 11-21-82) '9770' - 9790' BKB ( " ) An SSSV will be set and tested in the ball valve nipple at 2169'. *Contingent interval, to be perforated if well will not sustain flow. Sabsequeat W?k Itepo~texl ereb~e ~in ' 14. I h rtif g is true and correct to the best.of my knowledge. Signe _ ' TitleDistrict Petroleum ~.nqineer ovv f\~_ C,~rn i~ The sl~e bel iss'o se 0 Date Conditions of Approval, if any: ORIGiNAl SII~N£D Approvedby BY [ON,~ll£ C. Si~ITH COMMISSIONER Approved Copy Returned By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY ..J /,. Mr. Harry W. Kugler, Commissioner Alaska Oil & Gas Con. servationC~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Niakuk No. 3 Prudhoe Bay Unit A-24 'Prudhoe Bay Unit TR. No. 1-11-12 M TELEPHONE (907) 276-511.~2 MAIL-POUCH 6-612 ANCHORAGE, ALASKA 99~0~ ~;I STAT TEC- :~ CONFER: ' FJLF: Alaska Island No. 1 Gentlemen: Reference is made to your letter dated February 4, 1983 regarding digitized 'LIS tapes for the above-named subject wells. These tapes'have· all now been submitted to you under separate cover, with the exception of Well Niakuk No. 3. No digitized LIS tape. is available for this well. cc: Well Files #17 Ver~truly yours, R. H. Reiley District Drilling Engineer RECEIVED - F E B 2. z, 1~83 Alaska Oil & Gas Cons~ Commissio,q Anchorage SOHIO ALASKA PETROLEUM COMPANY 31 1 1 "C" STREET ANCt~ORAGE. ALASKA SFO ARCO TELEPHONE 1907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 10: EXXON PHILLIPS STATE OF AK Date: 2-11-83 Trans.#: CC#: 56127 CENTRAL FILES (CC# ' s-Transmittal .Only REFERENCE: Getty / State~t 1-4-83 D-22-- 1-6-83 Q-2 / 1-8-83 · '""F-18"~ 12,20-82 ~H-18~ 1-3-83 mC-3 ~ 11-25-82 ~22/ 1-5-83 ' . 'C-28 Z2-30-82 'B-22 8-22-82 'Z-10 8-25-81 ~8-21 12-11-82 SOHIO MAGNETIC LIS TAPES & LISTINGS ~/he following material is being submitted herewith..Please acknowledge receipt by signing a copy of thi-s letter and returning it to this office:-- C.H. TDT-M Open Hole C,H. C, H, .TDT-M Open Hole C,H,. Q~L C.H. Open Hole BHC-AC/CDL-CD/CN BHC-AC/CDL-CD/~ O.H. Replacement O.H. Replacement DIFL, BHC/AC, CDL- CD/CN O.H. Replacement DIFL, BHC/AC, CDL- .CD/Ct,I ACC 66256 ACC 66304 ACC 66306 ACC 66247 ACC 66257 ACC 66336 ACC 66204 ECC 1539 ECC 1590 ECC 1423 ECC 1373 ECC 1546 ECC 1075 DCC 1566 Run #-'-'""Dres ~ #- Dres'~ Run #- Dres Run #- Dres Run #- Dres Run #- Dres Run #- Dres .:41sro *SFO & EXXON' An Asterisk:(*) next to a listing abouve means you should have received the TaPe(s) and Listing(s) directly from the respective service company. Please confirm this. ~[c[,vEo -Arme Jones c/ " ' Development Geo]_ogy ,~'~:~.:.~ ~..-T'"- -~ -~ ~ - ' February 4, 19-83 ~" ~' ' ' Mr. R. H. Reiley District 'Drilling Engineer ~'~ Sohio Alaska -Petrol'eum' Company .. Pouch 6-612 Anchorage, Alaska 99502 Dear 1-ir. Reiley, The Alaska Oil and Gas Conservation Commission has recently checked the records of wells completed since January 1, 1979. This review has revealed that the digitized data for certain logs run in a well is not on file with the Commission. f' The Oil and Gas Regulations require the operator to file, within 30 days after comPletion, suspension, or abandonment of a drilling well the digitized 'data, if available,-for copying, for all logs run in the well except velocity surveys., experimental logs and dip- meter surveys. We would request that you check your records to see if the data has been submitted to the Commission and, if not, that you comply with the regulation with regard to the following ., wells: ~ ' .. Niakuk No. 3 Prudhoe Bay Unit Mo. A-24 Prudhoe Bay Unit TR.~ No. 1-11-12 Alaska Island Mo. 1 Prudhoe Bay Unit No. B'20 Prudhoe Bay Unit B-21 Thank you for your. cooperation in this mat. ret. · Yours very trul-y, BY ORDER OF THE COMMISSION be SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY TO: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS ~___~TATE OF-~_ _ BPAE (Transmittal 0nly) , CENTRAL FILES(CC#'s-Transmittal Only) 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 1/19/83 Trans.#: 3041 CC#: 56041 REFERENCE: O,.E The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/UNIT/STATE: B-20 GR-Collar Log 11/29/82 #1 8656-9910 Dres 5" (4/82) RECEIVED DATE .. ,.: =:: Victoria Aldridge Alaska Oil & Gas Co.s. G0m~lopment Geology .............. ~,qlchorag8 Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 December 22, 1982 · Alaska oil & Gas Conservation Conm~ssion 3001 Porcupine Drive Anchorage ~ Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WRLT. 'B'20 ' (14'29'11-14) 'PBU Enclosed, in duplicate, is Form 10-407, Well Completion Report, for the above-named well together with the Well History, Well Logs and Directional Surveys. Thsi well has been completed as a non-perforated oil well. Very truly yours, enCS CC: R. H. Reiley District Drilling Engineer Well File #17 Geology DEC2 8 Gas Cons. commission AnchOrage ALASK .~AND GAS CONSERVATION C ~ .-~SSIO WELL COMPLETION OR RECOMPLETiON REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-168 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50_029-20842 4. Location of well at surface -~-- ..................... 9. Unit or Lease Name 564' SNL, 1895' WEL, Sec. 31, TllN, R14E, UPM !LOcA'rI©N$i Prudhoe Bay Unit ' VERiFiED At Top Producing Interval ~::~p Of Sag. R. Sst. ,. i 101 Well Number 798' NSL, 627' EWL, Sec. 29, Ti]N, R14E, UPM At Total Depth 11. Field and Pool 906' NSL, 861' EWL, Sec. 29, Ti]N, R14E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Pruc~hoe Oil Pool KBE = 80.03' AM~L ADL 28310 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 11-8-82 11-21-82 11-26-82I feet MSL One 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10047'MD-9252'TVD 9920'MD - 9130'TVE YES ~[ NO []I 2169 feet MD 2100' 22. TyPe Electric or Other Logs Run GR/SP/DIFL/BHCS/C/qL/CDL/CAL, CBL/VDL/GR/C(IL, G~oscopic survey 23. CASING, LINER AND CEMENTING RECORD sETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20x30 Ensulated Conductc ~ Surface 110 36 9 cu.yds, concrete 13 3/8 72# L-80 Surface 2678 17 1/2 3720 cu. ft. Permafrcst II 9 5/8 479 L-80 Surface 9189 12 1/4 1242 cu. ft. Class G; 133 cu.ft. Permafrcst C 7 269 L-80 8933 10040 8 1/2 ..~ 381 cu. ft. Class G w/18% salt 24. PerforatiOns open to Producti'on (MD+TVD of Top and Bottom and 25. Tu'BING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5 1/2" 8848' 8848' 'W/4 1/2" tai:.pipe 8997' None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. · : · . DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27. PRODUCTION TEST Date First prOdUctiOn ' M~th0d Of' Operation (Flowings gas lift, etc.) · Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO · TEST PERIOD Flow Tubing Casing PreSsure cALCULATED .k O]L-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) · Press. ~ 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None :' : RECEIVED , DEC2 8 1982 Alaska Oil & Gas Cons, Commission Anchorago Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Sag. R. Sst. Shublik Ivishak GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH SLTBSEA 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 9225' 9259' 9343' 8392' 8423' 8502' 31. LIST OF ATTACHMENTS Well History, Well Logs and DireCtional Survey 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Title Date R LH. Reiley ,v- ~ INSTRUCTIONS General' .This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement.: ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 tiO!~s!mtttoo 'sooo s~9 ~ I!0 ~sel¥ WELL B-'2:0 '(1'4"2:9-'11-:1'4:)' PBU WELL' HI:STORY Spudded well at 0230 hours November 8, 1982. Drilled 17 1/2" hole to 2700' Ran 65 jts. 13 3/8" 72# L-80 Buttress casing to 2678'. Cemented with 3720 cu. ft. Pezmafrost TI cement. Installed and tested BOPE. Cleaned out to 2633', tested casing to 3000 psi, okay. Drilled out to 2715', ran leak-off test to 0.65 psi/ft, gradient. Directionally drilled 12 1/4" hole to 9204'. Ran 225 jts. 9 5/8" 47# L-80 Buttress casing to 9189'. Cemented in two stages; First stage with 1242 cu. ft. Class G cement; second stage through D. V. packer at 2619' with 133 cu. ft. Permafrost C cement preceded by Arctic Pack. Cleaned out D. V., tested casing to 3000 psi, okay. Cleaned out float equi~nent and directionally drilled 8 1/2" hole to 10047'. Ran open hole logs. Ran 28 jts. 7" 26# L-80 IJ4S liner to 10040'. Cemented with 381 cu. ft. Class G cement with 18% salt. Cleaned out to 9920', tested liner to 3000 psi, okay. Changed well over to NaCl. Ran CBL. Ran 202 jts. 5 1/2" 17# L-80 A/B Mod Buttress IPC tubing with 4 1/2" tailpipe assembly to 8997'. Landed tubing with ball valve at 2169'. Installed and tested tree. Displaced tubing to diesel, set packer at 8848'. Tested tubing to 3500 psi, okay. Released rig at 1200 hours November 26, 1982. Ran gyroscopic survey, secured and tested well November 30, 1982. SOHIO ALASKA PETROLEUM CO. (14.29.11'.14) B .20 PAD. B Controlled Drilling Consultants LES HENDERSON 349-3114 - .. '.- ; !:1982 ~.~ · ;~Rad~us.":~of:,~ CurvatUre. The depth -. Very :;:W..-'::~Har:~ingt°n re~;~ion~l "SUpervi sot - ,e'Shot Survey (14-29-11-14) · ~. ~.,~ . ~-09-82 ~0 11-18-82 'RECEIVED DEC2 8 COMPLETION REPORT SOHIO ALASKA PETROLEUM MACH£TZC SINGLE SHOT SURVEY RA~ ...... ~O~T~""HE'TYHOD OF COMPUTATION COMPUTED FOR CDC BY ~CB~N'TECH('FH LiNDSEY & A~$OC,) ) 22 NOV, 82 WELL 8-20( t 4-29- KB ELEV, 80,0.3 FT, RECORD OF'~URVEY ........................... Y'~O~ DO~-LiE--G .............................. --~E--P-T~--'~EB ................. ~B'P"TH 'SE'~ ~'iR'EC D-"I-'~-T~H~E .............. ~'i~E ................. i~TI-O'OFT- ............ .............. D:~---H ........................................ DEG. ' ~ ............................. :D-~"-~ ................... ................... -0-' ....... -O .......... 0 .... ,OO -80,03 S ,OOE ,00 S ....... 9-ER-T~'~'~-L' T:O '27 O0 ~929 4 ~0 29287~5 ...... 2~48,82 ' --30~-3---'~-~ .......... '~-i~-~2-:'2~ ..... 2'e~2,20 ...... ~-i-~"&--'-'Ti~ ...... 0 ..... ~-1-'-4~:';-~'~3063.44 ......... 3~"---~--~---"~ ....... ~-2~-~"~-~-' '~"i 5'5 ;-02 ......... 3'3~""-1-i ...... -i'~ ........ ~'3~";'"~'~' 3a46,20 .......... 3~-4-T~-'---~ 3-~--f-6--;'~ 3336.51 N69, ! OE NS?, 90E N57,90E N4~ '~OE N47, CeE N53,40E N56,10E ...... ~-8-5-'3---i-~--~Z-~- ...... ~-8-3~-:--b~-" 3751.99 ........ 3'9~7-'-~b ....... -~ ......... ~-9-2i'":'-02 384 O, 99 ........ '~-0~'7--'~- ....... & ~-0--'~4 ,-98 3~24.95 4~9'-~ ....... ~ ..... -~"i-'~-9";"46 4099.43 N53,60E N54,00E H54,40E N55,40E NS? ,50E ' N58,90E 4 15 .'36 47 70 8.3 t10 127 146 ,33 N ,72 N ,95 N .49 N ,55 N .31 N ,15 N 4606 ~8--~4'$ ....... 4~-f2-; 4:7 - 4432,44 N61 , 40E 2; 7,46 N 5064 2~ 36 4914,21 4834.18 N62,10E 381,56 N ........ ~1'~ ....-O ....... ~-3'i'a;a~ 523a.az N62.4OE 479.27 N ~99 ~i ]~ ~48,42 5568.39 N62,80E 565.56 N 6390 35 12 6058,95 5978,92 N62,40E 689,42 N 150,72 E ...... i'-'~"~'","'2'"O'""--Fi'-'"~T~-""i"'~i ..... 'f~-'-'-'E ........................ 1---~-~ ................................ · 02 N 1'83".'22' E .45 N 20~'~7'3-E ~ 66, 13 N 239,3~ E 2~'f";-'~-'-'-~ '--~S-"'-i-'4 "'29'""£- ........ '2'-;-~9-?- .................. ~ 89,52 "N 2'?'?. i"2-' 'E ............ 4'~ 0 '.'~' ' Ei'O 9::,' 8-3"- E ..... 9 ?'-~. SOHIO ,WELL B-~O SINGL£ SHOT SURVEY 22 NOV, RECORD OF SURVEY '-~t-~-:' --~*~Y-'-~'~-~'~"~L SUB DR I FT TOTAL COORD iNA TE~' ...................................................... 6884 33' 6 ~467.75 6.38, . 72 N62 4 OE 817 89 N 146 0""9'~"' -E ................ fi~-'TF4-;--~S'-N-'--~-O---~--~'---'~--~- 4~ ............ ~7'~'-;~- 7356 33 i 2 6e'~-~"9-3 67'8~. 9'0 N~O. OOE 942. ~3 N i'~e~',- i 5'-'-E- ........... -i-~:~'-~-"-N'-~'~:--:~9 ........ ..................... ~ ........ ~.-.-.~--: ................ p. -.: ---: 7606 ~4 12 70~0.91 b990.88 N59.30E I012.32 N 1806.85 E ~'O-~-'-:iT--~-~-O-'-~'--~=2--E .4f~-- .......... ~-~-'"--~-~"-~'~ ....... '7385. ~ 6 7~05. ~ ~ N58.9OE I i ] 8,32 N 19e3.9~'-E ...... ~-?':?"-;-'~-"'N"-'~"---"~'5-'"~7'""-:E-:-' .................. :~'~:'~ ....................... ~2~7'";'-~ ...... ~56'-~'~ .... ~-?-~-'-;'~- ' 7'~5'. 8~ N58.90E } ~I 7.66 N 214e, 66 E 24'~-g',-'7-O"-"N':'-'"~'-O'----~-~'-'-'3-~-~ ................... ;-"77~ ....................... '~'-~'9":'~-~' ....... -~?~-O-'--'~-T~ ..... '~'0-~'~";"3'~ ..... 795~. 33 H6 O. 03E 1 ~O~. 57- N 229'9'. 37 ......... 9-~"~-----~-~'-'-~ ......... ~'i'~'~".89 8211.86 N63.40E 3364.18 N 2406.44 E 2766.22 N . .........~ ........ ,-~ ........ = ................ ~= ........ ~-~- ...... : ........ ~ .......................... :~= ~ ................ 7~;- ~ ........ 9127 23 54 8395.83 8315.80 N65,10E 1384,52 N 2448.62 E 2812,94 N --8-~Y-T-:O-H-~-L:-I~---~..L:-~-$ORE '~8iE~,94 FEET AT N 60:30 ~3 E ................ SOHIO ~ELL 8-20 ) ') SINGLE SHOT SURVEY ,;a~. HOV 82 MEASURED DEPTH AHD OTHER DATA FOR EVERY EVEN I00 FEET OF SUB SE~ DEPTH. TRUE VERTICAL SUB HD-TVD DEPTH SEA DIFFERENCE VERTICAL ................................................................................................................................... CORRECTION TOTAL ........ COORDIN'i~rE~ ........................................................................................... .............. 780 780. ...................................... E~-O 88 O, .................................... ~ 980. ...................... ~~_ .................. ~ 0'8 O, .............. ~'8-0 ............ i 28-0 , ........... ~~ .................. I'58-0. ~-8' 188 O. 1-9~ ........ ~ g80, ................... 20~' 208 O. .................... 2180 '- 218 O. .................................. 2-28'0 ............. 2280, ................. 2~80 2480. ....................... ~~ 26~ 0. 278'0 278 O, 288-~' ~88 O. ............................. ~0 ............. 298 O. ...................... ~82 ................... JO8 ~. ............. -J2~5 ' 328 O, ?00 800 900 ~ 000 i 200 ~ 3,00 1400 ~?00 {800 J900 2000 2100 2200 23,00 2400 2500 2600 27'00 2800 2900 3000 3100 3200 3300 34,00 0 '0 700--~ -;'-00~ ........................................................... 0 0 ,-~-0-~-"~ ............................ -,-'00-'~ ................................................................................ '- 0 0 '~--0-0-'~- T~"':'-~ .............................................................................. 0 0 .'-O'O" '~ .................................... ¥'0"0--"~! .......................................................................................... 0 0 , -0~--8 .................. ,--O-O--l~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3, 4 6 8 0 0 0 0 0 0 · 00'-S ............. -;-0-0-'--'~ ............................................................... "'/'-0'0'-8 ......... ;'0'0 ~J ,--0-0'"-$ ................................ -,-'-0'0'--1~ ,54- -'S ............... ;-25-E ........................................................................... I. 22'"'-'8 .......... 2-';-7-4'- 'E "f. ~'0"-'-N ................ 10-.-3,8--E ....................................................................................... 8",95-'N .............. 2YT-03-'-E 18', 98 N ~8';'64- E :30,7'0 N 53, O3--E 43 ;'64' '-N 6'7759--"E 5~, 32 N 83-/'4-i-' E SOHIO WELL B-20 SINGLE SHOT SURVEY 22 NOV, 82 MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN lO0 FEET OF SUB SEA DEPTH, TRUE ....................... HE-A'~-URE-D VERTICAL SUB ND-TVD VERTICAL ............... DEPTH DEPTH SEA DIFFERENCE CORRECTi'ON TOT~ ....... ~OR~D-~-T~ .......... ....................... .......................... -3-~9'i .............. 3-Se 0, 35 00 11 3 .......... 68-; I-'6"""H .................. T-01~-7~---E ........................................................................... .................. ~9~S ........................... 3-688'~ 36 0 e t 4 3 ..................... ~3T~- ~' ....... ~' ............................................................ ~ ~ ................................... 3-7'8 0'. ........ 37'0 0 l' 8 4 f0-O-;'76-N .............. T~2'-~ ..................... ~i~-01 0 .............................. 3-988. ................. ~l--f-Y9 .................................. 5'080, ................................. ~P23-0 ..................... 4 i'8'0. ............................. ~3-'42 4280, ................... ~ '438'0. ...................... 4-Ei-I59'4~80. ...................... · ~,~'3 ............... ~58 O. ................. ~- 4680, ................... 4---9-T ~i ............................ -!S~5 488 O, ................. 5'~I-3Sr 4980, ................................ ~ .................... -5'.-3-6-SS-'f~"O, .............................. 5-~78 528 O. ..................... S59-0 ............. 5380. ...................... S?-~ ~'~I8'0. ........................... b't~f9 ............ 558'0. ............................ 593~; 5688. '380'0 23 3900 30 4000 38' 4'1 00 49 420O 62 4300 75 4400 88 4500 ! 03 4600 I17 4700 131 4800 490'0 158 5000 i72 5100 185 5200 5300 210 . 5400 224 5500 239 5600 256 ............................. -g-05'-4 ............................... S'?-80, 5'? 00 2 ? 4 ............... --61-73- ............................ 588 0. ...................... ~29g ......... 5980. ..................... -6~q-~- -6'-0-8 0, ......................... b-b'5'~8 ..................... ~S 1 '8 O. ....................... ~6~9 .... 628 O. ........................ '~779 ........ 6'38 0, .................... -6~-9 .................... 6'4-8 O, .......... 7OT~ .............. 6;'580. '713'7 668 O. ................................ ,~'2~7 ........ 678 O, ....................... ~ ............. 6'88 0. ....................... :~a--"a, ...... ,,,, - -74'~o b980, 5800 293 5900 3t3 6000 335 6100 357 6200 378 6300 398 6400 418 6500 660O 457 6700 476 6800 496 6900 ....................... 1'1:'9-.-'6q~ ............ ~ 1 ? i., 45-E .......................................................... I-4 0'776--'-'N ................. 2-0TV~3--E ........................................................................... I-6-4-V27---N .......... ~6'-;--gg--E ................................................... 1-8-9-~7~T'lq- ............ 277V37'-E .......................................................... ~':I-6"7-1-:O'---N" ............... 3-~q---;-8~'-'-E 2'~2'752-N ................ 3~'5-'-E .............................................................................. 2~8'79'0--N ............... '¥V-4-.-78-'-E ....................................................................... ~rg.~--; ' 'i-9-['l ............... ~5-~'vg-~-'-'-E~ .................................................................. 33T/~?' "N ............. ~'-5-TT'-;--2-O--E ........................................................................... 3-4?-~-'-i'Ei" '~ ........... -5'593-4~d-'E ................................................................ -'3727~--":N ...... ~-0T/.-~2--E- ............................................................. 3'9'~-72~'-'N ............. -~55-2~-'-~"-'-E ................................................................................... 42'3-7i-'9'-1,1- ............... T0~-;-9-~ 4-a:7-:'~-6-'-~ ............... ?~-9-:-4'7'"'-'"E ...................................................................................... 4-95'";'b-'.5----H .............. 8~1-;-02' 'E .r- 5'20':'59--'-N ............. 5-~-6 .--e~----N ................ 574-;' 4'O-'"N .................. '~-o3-;'i--2--'N' ............... ro-4~9'T--~7--E 632-;'99-'N ............. T'VO6'--;-~-'E~ 6'64 ;'0S 'H ....1-1-~i5 ',---6-2-' E ............................................................................... 6-~ ~' ;' 3-0 -'N ~ '~28-;-4'0-'--E ..................................................................... ~-8-:-5-4-"-~ .............. ~'~0-70'7-"'E .................................................................................. 21 20 20 20 i9 20 20 SOHIO, WELL SINGLE SHOT SURVEY 22. NOV. MEASURED DEPTH AND OTHER DATA FOR' EVERY EVEH lO0 FEET OF SUB SEA DEPTH. TRUE ............... M-E-A~U-t~E0 .......... VER'T-IC~L SUB MD-TVD ............................ ~-= .......... DEPTH SEA DIFFEREHCE .......... -F6-f-?- ................ ? 08 O. ? 000 5.~ 6 ..................... ?~-' ...................... ?f'80 .' ?i 0O 55? .................... --?-e~-? ............................ 7-2'8~, ? 2'00 57 ? ?38'-0. 7300" 59'5 ..................... E0-9-4- ................................. ?'~8 0. 74 00 613 .................................. ~=2=i-'T .................................. ?-58 0, 75 O 0 63 0 VERTICAL .................................................................................................................................................................................. cORREC T IOH T'0'Ti~I: 20 ........ i---0-fS-';-4'i~'---H ........... l~'l':2='-l?---'E- ............................................................ 2 'i' 'f 04-9-' ;'8"i-T;t='-""=-""T~-6~-2'"-'"'E-- ......................................................... ~ 2'0 f-0-8-3~-53--1:i ............ -fg~67-T~"--E ...................................................... -J'8 .................... I-'IT~'-,--~--~ ........ '- :-E ............:- ............................... J e i-f-4-8'-;'9-f--'~ ............... 2-iY'dziC-,6-~-'-E- ........................................................ t ? 'I--1-:6-e-;-':0S--H: ........ :'2~-6-;-3-0-E ............................... ~4--4-i- ........................ ?780, ??00 660 .............................. ~5'P3-~i ................. 7'8'8 O, ?e 00 674 ........................ ~67 ?98'0, 79 0 O 686 ....................... ~:0- ................ 8I 8-8. 81 00 ? 09 .......................... 9-00~ ............................. 828 O, 82 00 ? 19 .............. ~ ............................... 8'3~' O. 83 00 72 9 ...................... 'gT2-'Z ................... 8396, 8 ~ 16 ? 31 -e-~ ...................... ?'6'00'. ? 600 646 i 6 ........... 1-2-f~"-;- 0-~--l,l ........... R-J:'3-~ 6-=-O-~,-E'-- ..................................................... SOHIO WELL B-20 SINGLE SHOT SURVEY 2.2 NOV. 82 EVEN 1000 FEET OF MEASURED' DEPTH, TRUE ................... M-E-~-i~O~-E'~ ......... VERT i C'AL SUB .................... b-~PTi, i- .......... DEPTH SEA '~i ........................ .............. f~t)~ ...............t"O00. ................. ---~0 ............... 2-0'0-0, .......................... ~0-0 ......... 2'9-9'9, .................................... ~f-~-~O .......... 39-7i . ............................ -5~-0-0 .......... 4'858, -IBO. 920', 2919, 3891. 4??8. ................ 6-0-0-6 ..................... 573-'4. - 56'54, .......................... -70-0.0 .......... 656'5', 648~i, ........................ -8'00'0 ........... 7'4"00, 732 O. .......................... 9-(P8-0 ................ 8'2'8'0. 82 O O, .................. ~~ 8-~9~'-. 8'3 ......... - ................... , · -, ---~ -~, ..... ut;OD · , {, ~ ] i , ~,, -I i iTM {., -, .. _ . .. , { , il { t Ill 1I I' ~J_i i { i I : ~ i { I { , , t t { I I I ' I l.. t : I i i { [ ! I ! L I i I ! ' ~ I t i ' ' · ' { { i t. ;iii .j : ~llJ{~{_Iii v'' ,,r;. · .I ~ I I. ~ , , , I t 11 ; [.t i i i ~ i ~ : ~ : : ~ i ~ - -'~ r'-c '. I ..... ~ , -~-~ --~ ~ ~-~-~ ..... ~-~-- ~~----',.~--~.~~:~:~-'.&.,~__ · '.&.L~..~_i~ ' '-_~. ~ .. ~.=L_~ .. ~ , .~ _~vTi-.---.~- ,-,__?. .~ ................................ ~ ...... ~ ...... ~. , , .~ ~ ~, ~---~-.-~, ~ ~ ........................... _ ..... 1 .... I . t ............ , ~ ..... .............................. ; .................... j ............ ~ ~ . t , ' [ ~ , ~T ': ......... t ........ ; ..... :---{ ......... ~ ..................... -~ ................ ~ ............... ~ ............................ ~ .......... ~< ...... ~ .... ~ - ~ ...... ,~ t . t ~ ' { ' ', ' ' I ' ' ~ ~ - ~ ' ~' ' ~ ' ' ~ '' " ' ' ~ ' ~ ~ - ...... ~ .................. i ......... ~ ........... ~ ............ ~ ........... ~ ............. ~ ............. ~ ....... ~ .... ~ ......... .................. i ........... ; ...... ~ .............. ~ ............. ~- ~EPTN~-~NO~N- -~. ..... ~ ............ l ................. L; ........... ................. ; ............. ' ......... ~' "~ .... ~cJ'- : ~ ': -,-~ ..... +-"~- " " .............. x-'~ ....... t ..... .-7 ........ ~ .... ~ '' ..... 7~ 7tx ........ ~ ................ ~_. .Z~]] ~ ~" ......... ~ ............... ~ .~ ..... ~ 7~'~-7-'__.x_.~' .... ~ .... ' :' .... ~' ~' "; ~ : ' ............. i ........... : ...... ' - ~--- ~ ........ ~, b ....... ~-~ ,~-' ~ '- ~ .... ~_.. ~_~__~_'~~-_z ' ' 7~-i ' . _ , ' ~' _- ..... ' , ' ~ ' ' ...... i__ J ~- 7 r . : ....... :-- ..... l .... ~ ' ~ ~ ~ ' ' .... : - ' - ......... ? ~.-~ ............ ~ ..... ~ ~~.~._~_~ ............. ~~' -' ..... I ......... - ..... 4 ; z _= - ~ ~ : ,, ~ ~ i ..... : . ' _ ! : ; i .. .... ', . '. t .... : : ' . j ; ~ . : ' December 17, 1982 Mr. Gary Plisga Sohio AlaskaPetroleumCompany Pouch 6-612 Anchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job No~ Boss-16137 Well: B-20 (SEC31TllN R14E) Prudhoe Bay Field North Slope, Alaska' -SurveyDate: November 30, 1982 Operator: 'Tom McGuire' Mr. Plisga: Please find enclosed the "Original" and sixteen (16)'copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Kirk Afflerbach District' Supervisor KA/pr Enclosures 0EC2 8 1982 Alaska Oil & Gas Cons. C°rn~i$$iorl Anchorage 5 ) ) ....... SPERRYzSUN'~-WE~LTis~RvE~I-~'6~PANY PAGE ANCHORAGE' ALASKA SOHIO ALASKA PETROLEUM COMPANY' DATE OF SURVEY NOVEMBER _o0, 1982 B-20 (SEC 31T11N R14E) COMPUTATION DATE BOSS GYROSCOPIC SURVEY PRUDHOE BAY DECEMBER 2, 1982 dOB NUMBER BOSS-16137 ALASKA KELLY BUSHING ELEV. = 80.03 FT. OPERATOR-MCGUIRE VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE SUB-SEA MEASURED .VERTICAL VERTICAL DEPTH DEPTH DEPTH 0 0.00 100 99.98 200 199.94 300 299.91 400 399.87 500 499.84 600 599.81 700 699.79 800 799.76 900 899.74 1000 999.71 1100 1099.68 1200 1199.65 1300 _1299.63 1400 1399.62 1500 1499.61 1600 1599.59 1700 1699.58 1800 1799.57 1900 1899.57 2000 1999.56 2100 2099.55 2200 2199.54 2300 2299.53 2400 2399.51 2500 2499.49 2600 2599.46 2700 2699.43 2800 2799.39 2850 2849.35 '80.03 19.95 119.91 219.88 319.84 419.81 519.78 619.76 719.73 819.71 919.68 1019.65 1119.62 1219.60 1319.59 1419.58 1519.56 1619.55 1719.54 1819.54 1.919.53 2019.52 2119.51 2219.50 2319.48 2419.46 2519,43 2619.40 2719.36 2769.32 COURSE COURSE DOG-LEG TOTAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 0 0 N~.~' O. 0 1 .~7 · .~ 1.09 1 33 S O. 80 1 30 S 9.30 1 30 S 3.89 I 22 S 10.19 1 21 S 4.80 i 13 S 4.80 i 1.3 S 14.80 1 10 S 20.60 1 30 S 29. 0 I 22 S 29.30 i 16 S 31.50 0 56 S 24.1'9 0 55 S 16.80 0 58 S 19.10 0 55 S 21.10 0 53 S 24.89 0 23' S 17.69 0 .42 S 29.80 '0 '44 S 36.6O 0 34 S 40.69 32.69 E 0.00' 0.00 0.00 0.00 E 1.63' - 1.42 S 0.0,3 E -0.64 E 0.08 4;20 S 0.09 E -1.90 W 0.27 6.85 S 0.11 W -3.32 E 0.35 9.45 S 0.23 W -4.65 E 0.21 11.94 S 0.07 E -5.56 E 0.13 14.30 S 0.38 E -6.39 E ....... 0..!-3. ............... 16.55..... S ............. 0..57_,E ................... .-_7.28 E 0.21 18.66 S 0.94 E -7.96 E 0.13 ~0.66 S 1.57 E -8.34 E O. 38 22.77. S ..................... 2._57 E .............-.8.45 E 0.13 24.98 S 3.80 E -8, "~ E 0.12 26.98 S 4.97 E -8._-~ E E E E E E O. 37 ......... 28.68 __ S ................. 5.89__.__E ....... ..-8.30 0.12 30.20 S 6.46 E -8.51 0.07 31.79 S 6.98 E -8.80 0._07 ............ 33.35 S ................ 7...55_E ..... -9.04 ._ 0.07 34.80 S 8.16 E -9.18 0.51 35.83 S 8.59 E -9.28 E ........0.33 .......... 36.68 S ........... 9..O0_E ....... .9.32 .... E 0.10 37.73 S 9.69 E -9.21 E '0.17 38.63 S 10.40 E -9.00 E ............. .._0..47 39..78S 11..23_E ............ ~8.82_.~ 0 51 S 37.'0 E i 13 S 34.89'E i1 19 ...... S 29.60_.E 1 18 S 32.60 E 1 28 S 64.89 E 2 0 S 67.19 E 2 16 S 69.30 E 0.20 41.14 S 12.16 E -8.63 0.37 42.60 S 13.22 E -8.39 ...... 0.16 44.48.._S ............1.4~4.0_F -8.23__. 0.08 46.43 S 15.58 E -8.11 0.79 .47.94.S 17.36 E -7.25 0.52 49.16. S ........... 20.13...E ........ -5.37 .... 0.58 49.85 S 21.87 E -4.17 SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31T11N R14E) PRUDHOE BAY. ALASKA SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA ~ VERTICAL SECTION CALCULATED ALONG CLOSURE ___ COMPUTATION DATE DECEMBER 2, 1982 TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH PAGE 2 COURSE COURSE INCLINATION DIRECTION DEG MIN ............... DEGREES DATE OF SURVEY .NOVEMBER 30, 1982 BOSS GYROSCOPIC SURVEY dOB NUMBER BOSS-16137 KELLY BUSHING ELEV ..... =--80.03 FT. ~ OPERATOR-MCGUIRE DOG-LEG' TOTAL SEVERITY RECTANGULAR COORDINATES VERTICAL ....... DEG/..10_0. .NOR_..T..H/_SOUTH ............ EAS. TZWES..T ...... SECTI ON ....... 2900 2899.28 2819.25 2950 2949.13 286.9.10 3000 29.98.81 2918.78 3050 3048.28 2.968.25 3100 3097.58 3017.55 3150 3146.76 3066.73 3200 31.95,88 3115.85 3300 32.94.10 3214.07 3400 33.92.31 3312.28 3450 3441.38 3361.35 3500 3490.40 3410.37 3600 3587..95 3507.92 3700 3684.72 3604.6.9 3800 3780..95 3700.92 3900 3876.25 3796.22 3950 3923.35 3843.32 4050 4016.66 3.936.63 4150 4108.34 4028.31 4250 41.97..94 4117.91 4300 4242.00 4161..97 4400 432.9.52 424.9.4.9 4500 4416..98 4336..95 4600 4504.48~ 4424.45 4700 45.91.76 4511.73 4750 4635.29 4555.25 4850 4722.37 4642.34 4950 480.9,.57 4729.54 5050 4897.14 4817.11 5100 4.941.12 4861.0.9 5200 5029.24 4949.21 3 '7 38 .9 0 10 ...... 6 10 45 10 48 10. 50 10 53 13 15 16 1.9 '20 21 25 27 .... 28 2.9 28 28 2.9 2.9 32 !~'~.~. 'N 78.80 E 4.01 .~.:.:~.~. 4...90 S 24.31 E -2 04 .............................. - .. ~ ~I~8 16 N 71.60 E ,3 65_ . -._48.88 S ................- .__O_I_E , 1.71 .......... N 61.30 E 5.26 46.55 S 33.11 E 7.31 N 61.6.9 E 2.70 43.10 S 3.9.48 E 14.54 ...... N 5'6.6.9. E ........ 2.75 .........38'.84_.~S .............46.~58__E .............22.82 · ~ N 58.50 E 1,45 33.99 S 54.22 E 31.84 N 56.39 E 0.7~ ~28.~7 S ~2.10 E 41.I6 N 48, 30~ E ............ 1 ..52 ....... · ~_1~.53~S ......... 76. ~3 ~ E ................ 5~. ~2 , i I ~ i N 51 30 E 0.57 5 ~6 S 91 ~2 E 78 05 11 10 N 11 ..... 32 ..... N_ 52 N 53.6.9 E 17 N 53.60 E 15 ...... N..53.80' E 0 'N55. OE 8 N55. OE 5.8 ........ N 56.39. E.. 4 N '58.1.9 E 38 N 5.9.69 E 53.3.9 E 0...0.9 5.9.1.9 E ........... 2.3.9 0.48 N 98.90 E 87.48 ....... 5.93 N ..... 107.08. E ........... 97.27 .... 125.34 E 119, ~ 145.61 E 144 ...... 167._52_E ............... 170..94 ...... 1.92.15 E 200..96 205.88 E 217.60 1.8~ ............. 96.61 N ............ 235.57_E .............. 253.31 ........ 3.18 118.13 N 269.16 E 2.93.08 2.65 141.00 N 307.20 E 337.41 2.62 18.15 N 1.42 33.07 N 0.9~ ...... 5 ...... 49.16_.N 2.78 66.77 N 2.28 76.38 N _ . 26 31 21 29 15 28 29 28 1.9 28 5 46 ......N._61.60 E ........' ........ 2.90 ........ 152.58__.N 4 N 0.29 175.58 N 55 N 0.20 1.98.53 N 59 N 0 06 22'1 '~ ........... ~..N_ N 0.45 244.29 N N 0.16 255.84 N 61.60 E 61.8.9 E 61.8.9 E 62. 0 E 62. 0 E N 62.19.. E N 62.30 E N 63.10 E N 63.10 E ,N 62.6.9 E ......... ~27._80E .... 361.0~_. 370.35 E 40.9.40 413.05 E 457.88 ..... 455.77_E ....... 506.30 .... 498.84 E 520.57 E .......... 0.1.9 278.84_N ....... 564.01E 0.11' 301.63 N 607.33 E 0.86 323.78 N 650.24 E 0.34 334.54 N .... 671.45~.E 0.30 356.07 N 713.52 E 555.11 57.9.72 _628.87_ 677.82 726.10 74.9.88 797.14 SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31T11N R14E) PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY PAGE 3 ANCHORAGE ALASKA .......................... DATE OF SURVEY NOVEMBER_30, 1982 COMPUTATION-DATE BOSS GYROSCOPIC SURVEY DECEMBER 2, 1982 dOB NUMBER B055-16137 KELLY BUSHING ELE~.. = _.80.03 FT. OPERATOR-MCGUIRE VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE SUB-SEA COURSE ' MEASURED VERT I CAL VERT I CAL I NCL I NAT I ON DEPTH DEPTH DEPTH DEG. MIN ..... COURSE ..... DOG'LEG .................. TOTA~ ...................................... DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEGREES DEG/1 O0 NORTH/SOUTH EAST/WEST SECTION 5300 5400 5500 5600 5700 5800 5900 6000 6100 6200 6300 6400 6500 6600 6700 6800 6850 6950 7000 7100 7200 7300 7350 7400 7500 7550 7650 7700 7800 7900 5117.66 5206.42 5295.22 5383.75 5471.60 5558.42 5644.18 5728.79 5811.87 5893.86 5975.58 6057.16 6138.81 6220.75 6303.11 6385.95 6427.51 6511.12 6553.20 6637~53 6721.74 6805.54 6847.34 6889.10 6972.21 7013.63 7096.18 7137.39 7220.28 7303.89 5037.63 27 36 5126.39 27 1.6 5215.'19 27 .... 28 ............ 5303.71 27 58 N 62.30 E 5391.57 29 5 N 61.89 E 5478.39 30 23 N 62.19 E 5564.15 31 30 N 62.69 E 5648.76 32 53 N 63. 0 E 5731.84 34 43 N 63.89 E 5813.83 35 7 N 62.89 E 5895.55 35 16 N '62.60 E 5977.13 35 23 N 62.39 E 6058.78 35 7 N 6'1.69 E 6140.72 34 49 N 61.60 E __ 6223.08 34 16 N 61.69 6305.91 33 51 N 61.80 E 6347.48 33 40 . N 61.50 E 6431.09 32 51 N'61.60 E 6473.17 32 33 N 61.39 E 6557.50 32 6641.71 32 .47 6725.50 33 21 6767.31 33. 10 6809.07 33 34 6892.18 33 59 6933.60 34 8 7016.15 34 34 7057.36 34. 25 7140..25 33 36 7223.86 32 55 N 63.60 E 0.65 377.17 N 755.19 E 843.83 N 63. 0 E 0.43 397.87 N 796.35 E 889.90 N 62.19 '-E ............... 0.-42 ............... 419.03 N ................ 8'3'~/i~-'E .......... 935-; 86 --- 0 50 440.69 N 878.~ . ~ E 982.38 1.14 463.04 N 920.54 E 1030.14 1.31 486.28 N 964.36 E 1079.74 1.15 510.07 N 1009.95 E 1131.16 1.40 534.38 N 1057.37 E 1184.45 1.89 559.24 N 1107.15 E 1240.06 0.70 584.87 N 1158.33 E 1297.28 0.23 611.26 N 1209.57 E 1354.91 0.18 637.97 N 1260.87 E 1412.' 0.49 665.02 N 1311.86 E 1470. 0.30 692.24 N 1~61.81 E 1527 80 0.55 719.18 N 1412.22 E 1584.51 0.42 745.69 N 1461.57 E 1640.53 _ 0.51 ......... 758.89. N ..... 1486.03_E ............ 1668.32 0.81 785.02 N 1534.25 E 1723.17 0.66 797.91 N 1558.00 E 1750.19 28 ...... N_60.80 E .......... 0._33' 823.88_N ......... 1605.0.5 E 1803.92 ..... N 60.19 E. 0.46 850.43 N 1651.98 E 1857.83 N 59.69 E 0.63 877.76 N 1699.21E 1912.37 'N 59.19 E ........ 0.67 ..........891..70..N ..........1722._83__.E ......... 1939.77 .... N 58.69 E 0.99 905.'~ . .. ~9 N 1746 40 E 1967.24 N 58.~ ' ~'~ ~9 E 0.44 934 90 N 1793.83 E . ~.75 N ........ 58.30 E 0.~4~ ........... 949.60 ........................... N 1817.68 E 2050.70 N 57.80 E 0.51 979.47 N 1865.56 E ~107.01 N 57.80 E 0.30 994.56 N 1889.53 E 2135.26 N 58. 0 E ............. 0.83 .... 1024.28 N ..... 1936.91..E ........... 2191.05.. N 58.10 E 0.67 1053.31 N 1983.45 E 2245.78 SOHIO ALASKA PETROLEUM COMPANY B=20 (SEC 31 TllN R14E) PRUDHOE BAY ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE SPERRY-SUN WELL'-SURVEYING COMPANY PAGE 4 ANCHORAGE ALASKA DATE OF SURVEY NOVEMBER 30,._1982 COMPUTATION DATE BOSS GYROSCOPIC SURVEY DECEMBER 2, '1982 dOB NUMBER B0SS-16137 KELLY BUSHING ELEV ..... = ..... 80.03 FT OPERATOR-MCGUIRE TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN COURSE DIRECTION DEGREES DOG-LEG TOTAL - SEVERITY RECTANGULAR COORDINATES VERTIC. AL .._ DEG/1 O0 .... NO_.R_TH/.SOUTH ....... EA.S_T/_WEST .......... SECTION ........ 8000 8100 8200.. 8300 8400 8500 8600 8700 8800 8900 9000 9100 9200 9300 9400 9500 9600 9700 9800 9850 9900 10000 1O047 7388.05 7308.02 7472.74 7392.71 7558.12 7478.09 7644.31 7564.28 7731.30 7651.27 7818.94 7738.91 7907,12 7827.09 7996.01 ' 7915.98 8085.63 8005.60 8175.91 8095.87 8266.58 8186.55 8357~55 8277.52 8449.15 8369.12 8541.66 8461.68 8635.11 8555.07 8729.20 8649,17 8823.90 ~8743.87 8919.14 8839.11 9014.75 8934.72 9062.71 .8982.68 9110.73 9030.70 9206.77 9126.73 9251.90 9171.87 32 26 N 31 48 N 30 55 N 30 0 N 2') 5 N 28 28 N 27 48 N 26 43 N 25 56' . N 25 '0 N 24 52 N' 24 lO N 23 6 ~N 21 30 N: 20. 19 18 17 16 16. 16 16 57.89 E O. 50 58.30 E O. 67 58.10 E O. 89 58.39 E O. 93 58.89 E ........... O. 95 .......... 59.30 E O. 65 59.39 E O. 66 60.10 E 60.39 E 61.30 E .62.69..E 65.39 E 67.50 E 1081.92 N 2029.24 E 2299.65 ........... 1.110,03 N ........ 2074...39_E ........ 2352.71 ....... 1137.45 N 2118.63 E 2404.65 1164.14 N 2161.75 E 2455.25 1189.80 N ............. 2203._,86_E ........ 2504.49 .......... 1214.52 N 2245.17 E 2552.58 1~o8.57 N 2285.74 E 2599.69 O. 79 1.01 .......... 0..60 1.32 1.36 ..... 1._14 .............. 126.1.65 N ........... 23~5.31__E ................ 2645.47 1283.66 N 2363.82 E 2689.80 1304.61 N 2401.38 E 2732.80 1324.41_.N ....... 2438.61_E ........... 2774.97 ....... ' 1342.59 N 2475.93 E 2816.'] · 1358.62 N 2512.68 E 2856.' 67.80 E ...... .1.61 .........!373,.06 N ..........2547,_78_E .............. 2894,18 ....... 11 N 66.50 E 1 38. 1386.86 N ~.o~A...58 E 2929.62 22' N 66.19 E 0.84 1400.44 N 2611.58 E 2963.37 4 .... :.N66,.0. E .... . :1.30 .... 1413.44..N ..... ..2640.92..E ......... 2995.38 26 N 64.60 E 0.75 1426.18 N 2668.64 E 3025.82 36 'N 63, 0 E 0.96 1439.10 N 2694.92 E 3055.09 11 N 63. 0 E 0.84 1445.51 N 2707.49 E 3069.21 11 N 63. 0 E 0.00 1451.84 N 271~.92 E 3083.14 11 N 63' 0 E 0.00 1464.50 N 2744 .76 E 3111.02 11 N 63. 0 E 0.00 1470.45 N 2756.44 E 3124.12 HORIZONTAL DISPLACEMENT = 3124.12 EEET AT NORTH 61 DEG. 55 MIN. EAST AT MD = 10047 THE CALCULAT I ON' PROCEDURES ARE BASED 'ON -THE'" USE 'OF-' THREE-D I MEN$i ONAL' RAD I US -OF CURvAToRE-ME'THOD. .......... SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31 TllN R14E) PRUDHOE BAY ALASKA ._ SPERRY-SUN-'WEL~ SORVEYING-CoMPANy PAGE 5 ANCHORAGE ALASKA -' DATE OF SURVEY NOVEMBER 30, 1982 '~ .......... COMPUTATION DATE DECEMBER 2, 1982 dOB NUMBER BOSS-16137 KELLY BUSHING ELEV. = 80.03 FT. .................................................................... OPERATOR-MCGUIRE INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE MEASURED VERTICAL DEPTH DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH ..... NORTH/SOUTH ........... EAST/WEST ..... DIFFERENCE ..... CORRECTION 0 0.00 1000 999,71 2000 1999,56 3000 2998~81 4.000 3970,29 5OOO 4853.19 6000 5728.79 7000 6553.20 8000 7388.05 9000 8266.58 10000 9206.77 10047 9251.90 -80,03 0,00 919.68 22,77~'~ 1919.53 37,73 S 9.69 E 0,44 0,15 2918,78 46,55 S 33.11E 1,19 0.75 3890,26 ..... 86,26'"'N ........ 219.99 E ......................... 2917'1 ........................... 28.51 4773.16 312.99 N.~ 628.97 E 146,81 5648,76 .534,38 N 1057,37 E 271,21 6473,17 ..............797~9'1'-N ......... 1558.00 E 446,80 7308,02 1081,92 N 2029,24 E 6.11,95 8186.55 1324.41 N 2438.61 E 733,42 9126,73 1464.50 N 2744.76 E 793,23 9171.87 1470,45 N ~7~6,44 E 795,10 0. O0 O, O0 117.10 124.40 175.59 165.14 121.48 59.81 1.86 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31TllN R14E) PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY PAGE 6 ANCHORAGE ALASKA DATE. OF SURVEY. NOVEMBER....30, 1982. .- COMPUTATION DATE DECEMBER 2, 1982 dOB NUMBER B088-16137 .......................................... KELLY.BUSHING ELEV. = .... 80.03 FT. OPERATOR-MCGUIRE MEASURED DEPTH INTERPOLATED VALUES FOR_EVEN .IO0.FEET OF SUB~SEA_DERTH ................................................... TRUE VERTICAL DEPTH SUB-SEA VERTICAL DEPTH TOTAL RECTANGULAR_COORDINATES .... NORTH/S.OUTH EAST/WEST ..... MD-TVD ........................... VERTICAL D I FFERENCE CORRECT I ON 0 80 180 280 380 480 580 680 700 880 .980 1080 1180 1280 1380 1480 1580 1680 1780 0.00 80,03 180.03 280.03 380.03 480.03 580.03 680.03 780.03 880.03 980.03 .1080.03 1180.03 1280.03 1380.03 1480.03 1580.03 1680.03 1780.03 -80. O. 100. .... 200. 300. 400. 500. 600. 700. 800. 900. 1000. 1100. 1200. 1300. 1400. 1500. 1600. 1700. 03 0.00 O0 0.85 S O0 3.66 S O0 6..33.$ ...... O0 8.94 S O0 11.47 S O0 ......... 13.83_S O0 16.13 S O0 18.25 S O0 ...... 20.28..S ..... O0 22.32 S O0 '~ ~4.56 S O0 26.60..~ O0 28.39 S O0 29.90 S O0 .......... 31.47._.S. O0 '33.05 S O0 34.52 S O0 ..... 35..70_.S O. O0 ............:_..: ..... 0...00 .......................................................... 0.02 E 0.01 0.01 0.08 E' 0.0.5 0.04 O. 02..W ............. .' ............ 0..09 ......................... O. 04 ...................... 0.26 W .0.12 0.03 0.01 W 0.15 0.03 O. 34 E ................... .0.18 .................... 0_. 03 ............................................ 0.54 E 0.21 0.03 0.83 E 0.23 0.02 1.43 _ E ..................... 0.26 ................ 0.02 ...................... ,2.32 E O. 28 O. 03 ~ 3.57 E 0.31 0.03 ..4.74: E ................ 0.34 ............... 0..03 ..................................... 5.76 E 0.36 0.02 6.37 E 0.38 0.01 6.87 E ....................... O. 39 ...... ' ............ 0._01 7.43 E 0.40 0.01 8.04 'E O. 42 0'. 01 '8, 55_ E ............ 0..43 .................0..0.1 ._ SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31T11N R14E) PRUDHOE BAY ALASKA iNG-"'~i SPERRY-SUN WELL SURVEY ~UMPANY .................................................... PAGE 7 ANCHORAGE ALASKA ............................. DATE OF SURVEY._.,NO~EMBER. 30,_ 1982 ..... COMPUTATION DATE DECEMBER 2, 1982 dOB NUMBER BOSS-16137 KELLY BUSHING. ELEV ....... ~ ..... 80.03.._FT ......... OPERATOR-MCGUIRE MEASURED DEPTH INTERPOLATED VALUES' FOR EVEN 100 FEET _OF__SUB..-.SEA..Ii!Ep.TH ............................................................... TRUE SUB-SEA TOTAL VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD-TVD VERT I CAL DEPTH DEPTH NORTH/SOUTH EAST/WEST D I FFERENCE CORRECTI ON 1880 1.980 2080 2180 2280 2380 2480 2580 2680 2780. 2880 2.~81 3082 3183 3285 3387 3489 3591 3695 1880.03 1980.03 2080.03 2180.03 2280.03 2380.03 2480..03 2580.03 2680.03 2780.03 2880.03 2980.03 3080,03 3180.03 3280.03 -3380.03 3480.03 3580.03 3680.03 1800.00 _..36.48._.$. 8.88 E ..................... 0.43 ....... 0..00 ................................................... 19.00.00 37.53 S 9.54 E 0.44 0.01 2000.00 38.48 S 10.28 E 0.44 0.01 2100.00 39.48 S 11.03 E 0.45 0.01 2200.00 '40.9'1S 11.99 E 0.47 0.01 2300.00 42.26 S 12,98 E '0.48 0.01 2400.00 ........... 44.09 $ ........... 14.17_E ................~_5! ................. 0.02 2500.00 46.06 S 15,34 E 0.53 0,03 2600.00 47.72 S 1'6.90 E 0.56 0.03 2700.00 48.90 S ........ 19.51 ,E .................. 0.60 ................. 0.04 ......................................... 2800.00 50.13 S 23.14 E 0.68 0.08 2900.00 47.63 S 31,01E 1,04 0.36 3000.00 40.55 S 43.97 E 2.14 1.10 3100.00 30.64 S 59,58 E 3.84 1.70 3200.00 19.32 S 74.92 E 5.65 1.81 3300.00.. ......... 6.84 S ..... . 89.48 E ._. 7.47 .................. 1..82 ............................. 3400.00 4.85 N 105,27'E 9.39' 1.92 3500.00 17.03 N 123.78 E 11,82 2.44 3600.00 32.31 N 144.58 E 15.11 3.29 SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31 TllN R14E) PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE DECEMBER 2, 1982 PAGE 8 ~.DATE OF SURVEY_NOVEMBER_.30._1982 _ dOB NUMBER BOSS-16137 KELLY BUSHING_ELE~.. ~__80..O3. FT ......... · OPERATOR-MCGUIRE INTERPOLATED VALUES FOR EVEN._ i_O0.FEET..OF....SUB--_.S_.EA._._.DE.P._TH_ ............ MEASURED DEPTH TRUE VERTICAL DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH NORTH/SOUTH .......... EAST/WEST .... DIFFERENCE- .... CORRECTION 3799 3904 4010 4118 4229 4343 4457 4572 4686 480I 4~16 5030 5144 5257 5370 5482 5595 5709 .5825 3780.03 3880.03 3980.03 4080.03 41.80.03 4280.03 4380.03 4480,03 '4580.03 4680.03 4780.03 4880.03 4980.03 5080.03 5180.03 5280.03 5380.03 5480.03 5580,03 3700.00 49.00 N 167.30 E 3800.00 67.51 N ....... 193 '-"~' .~ E 3900.00 88.43 N 223.26 E 4000.00 111.26 N 258.19 E 4100.00 136.31 N 299.23 E 4200.00 162,52 N 346.19 E 4300. O0 188.90 N ~'~'~=7~,. 04 E 4400.00 214.95 N 443.82 E 4500.00 241.18 N 493.00 E 4600.00 267.73 N 542.94 E 4700.00 293.94 N 592.68 E 4800.00 319.58 N 641.96 E 4900.00 344.03 N 690.14 E 5000.00 368.41 N 737.56 E 5100.00 391.70 N 784.23 E 5200.00 415.34 N 830.18 E 5300.00 · 439.77 N 876.5~ E 5400.00 465.25 N 924.68 E 5500. O0 492...~_ N ..... ~,..5~ _E ................ 2~5...02 19.01 3.90 23.97 4.96 30.47 6.50 38.83 8.36 49.81 10.98 63.37 13.56 77.75 14.38 92.02 14.27 106.50 14.48 121.39 14.89 136-11 14.72 150.51 14.40 164.17 13.66 177.50- 13.33 190.28 12.78 202.85 12.57 215.76 12.91 229.62 13.86 15.40 SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31 TllN Ri4E) PRUDHOE BAY ALASKA PERRY-~UN WEL'L ~URVEYINO t;OMPANY PAGE 9 ANCHORAGE ALASKA ................................. DA_TE_OF__ SLIR..~Ey NOVE. MBER_30, ..... !782 ............ COMPUTATION DATE DECEMBER 2, 1982 dOB NUMBER B033-16137 KELLY_._.BUSH I NG ELE?., __--. _._ 80.03 FT .... OPERATOR-MCGU I RE MEASURED DEPTH INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE VERTICAL DEPTH SUB-SEA VERTICAL DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH ............... EAST/WEST ..... D-I'FFERENOE CORRECTION 5942 6061 6183 6305 6428 6550 6672 6792 6912 7031 7150 '7269 7389 7509 7630 7751 7871 7990 8108 5780.03 5880.03 5980.03 6080.03 6180.03 6280.03 6380.03 6480.03 6580.03 6680.03 6780.03 6880.03 6980.03 7080.03 7180.03 7280.03 7380.03 7480.03' 5600.00 5700.00 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.00 6500.00 6600.00 6700.00 6800.00 6900.00 7000.00 7100.00 7200,00 .7300.00 7400.00 520.16 N 1029.51 549.53 N 1087.34 580.44 N' 1149.67 612.71N 1212 ,6 645.50 N 1275.27 678.76 N '1337.36 711.72 N 1398.37 ..... 743.82-N .......... 1458.08 E '262,04 17.02 E 281.24 19.20 E 303.06 21.82 E 325.42 22.36 E 348.03 22.61 E 370.34 22.32 E 392.04 21.69 -' .............. 412 ' 5 ................ 20.81 775.47 N 1516.59 E 432.95 20.11 806.11 N ..... 1573.03 E · 451.80 18.85 837.12 N 1628.'67 E 470.37 18.57 869.29 N 1684.71E 489.43. 19.06 902.76 N 1741.25 E 509.09 19.66 .... 937. &7 N .......1798.32 'E ........... 529-'~'0 .................... 20.32 973.54 N 1856.15 E 550.36 20.96 1010.07 N 1914.17 E 571.61 21.25 · 1045.14 N 1970.33 E 591,54 19.93 1079.21 N 2024.92 E 610.46 18.92 1112.40 N 2078.23 E 628.55 18.09 SOHIO ALASKA PETROLEUM COMPANY B-20 (SEC 31TllN R14E) PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY PAGE 10 ANCHORAGE ALASKA ................................ DATE OF_SURVEY._NOVEMBER~30, 1982. COMPUTATION DATE DECEMBER 2, 1982 dOB. NUMBER BOSS-16137 ..................... KELLY BUSHING. ELEVo = .... 80.03 FT. OPERATOR-MCGUIRE INTERPOLATED VALUES FOR EVEN 100 'FEET_ OE~SUB~SEA_DEP. TH TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR. COORDINATES___ NORTH/SOUTH EAST/WEST . .MD/TVD DIFFERENCE VERTICAL CORRECTION ~5 7580,'03 7500.00 ....... 1144,39. N._. 2129,77' ~41 7680,03 7600,00 1174,94 N 2179,31 8455 7780.03 7700.00 1203.73 N 2227.01 8569 7880.03 7800.00 1231.29 N .... 2273.45.. 8682 7980.03 7900.00 1257 64 N 2318 8793 8080.03 8000'.00 1282 ~1 N 2361 45 8904 8180.03 8100.00 ._I305.54.~N .... 2403.0% 9014 ~80.03 8200.00 1327.27 N 2444.16 9124 8380.03 8300.00 1346.79 N 2485.10 9233 8480.03 8400.00 ..... 1363.67._N 2524.85 9341 8580.03 8500.00 1378.77 N 2561.76 . ~ ~ 2595. 9447 8680.03 8600 O0 1~9~.44 N 68 9553 8780.03 8700.00 1407.5~ N 2627..78 9659 8880.03 8800.00 1420.91.N 2657.53 9763 8980.03 8900.00 1434.'40 N 2685,6~ 9868 9080.03 9000.00 ..... 1447.79 N 2711.97... 9972 9180.03 9100.00. 1460.~7 N 2737.84 10047 9251.90 9171,87 . 1470'45 N 2756.'44 E ................. 645..5'1.,~ .................. 16.~6.... ....................................... E 661.22 15.71 E 675.69 14.47 E ................ 689.34 ................... 13.65 .................................... E 702.09 12,74 E 713.74 11.66 E ............. ~724..52 ..................10.78 ................................................. E E E E E E E E E ..........788.00 E. 792.13 E. 795.10 734,80 10,28 744,61 ~,81 .............. 753,54 .................... 8,~3 ........................... 761.21 7.66 ) 767.82 6.61 ......... 773.80 .................. 5.98 .................................... 778.98 5.18 783.74 4.76 ........... 4.27 ....................................... 4.12 2.97 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM RADIUS OF CURVATURE) POINTS . . Sohio Alaska Petroleum Company Our Boss G~roscopic Survey Job No. Boss-16137 Well: B-20 (S~C31 TllN R14E) Prudhoe Bay Field North Slope, Alaska Survey Date: November 30, 1982 Operator: Tom ~ire Scale: 1" = 500' .TRUE NORTH O0 00 _500. O0 LocatiOn - (564SNL 1895WEL) ~oo,. oo ~ool~. oo ~o~i oo' ~_o%. oo HI/IR I ZONTFIL .PROJ.EC T. I ON ~sob. oo 10047 suggested ~' ~' ~m to he insertcd in each "Acti;'~ well folder to d~eck ~or timoly ccxnpliance wJ.~h our ...~'ulations. Operator, Well Name and Number Reports and Materials to be received by: Required, Date Received Remarks CCmPle~on, Ret:ort ... Yes / '. · Well History Yes /~. _~._~ /.~.. ~ '~ _Samples /~/&~ -- p ~ , , , ...... - i ,, , , , ,, , , ,, · Core ~scription .... . , ~~~ -, ~ ~'~, ,, . ~, · ............ Inclina~on Su~ey "/d i ,, , I&--~F-' I i i , Drill St~ Test Re~s ~~~~-. , , , .......... , ,,,, ,. ,,~ , M EMORA,',tDUM St&,e of Alaska ALASK~.~OIL AND GAS CONSERVATION COMMISSION November Cha*~~-~' .~¢< FILE NO: 108A/D THRU: LOnnie C. Smith -I " Commi s sioner ~ ~ ~ ~/...~TELEPHONE. NO: FROM: Ben LeNorman Petroleum Inspector 22, 1982 SUBJECT: Witness BOPE Tests on Sohio's B-20 Sec. 31, TllN, RI~E, UM, Pr_u__dhoe Bay_ Unit Tuesday, November 9,_ 1982- I departed my home at 12:20 p:,m.-~ f~r a~'12:50-- 'P~m. showup and 1.50' p.m. departure via Alaska Airlines flight #61 for Deadhorse arriving at 3:30 p.m. Weather: -21CF', clear, light wind. Wgdnesday, No.ve~r !0,_ _!9_8~2 - BOPE tests on B-20 began at 1:00 p.m. and ~re completed at 3:i5 p.m. BOPE inspection report is attached. BOPE tests on ARCO's DS 1-23 were completed, the subject of a separate report. F~iday,_ No?e.._m:ber. 1_2, 1982 - Standing by on DS 13-13. Saturday, N_ovember_ 13,_ .!.9..8._2 - BOPE tests on ARCO's DS 13-13 were completed, the subject of a separate report. $gnd~y, N0vember 14, 1_982 - BOPE tests on ARCO's DS 12-20 were completed, the subject of a separate report. I departed Deadhorse via Alaska Airlines flight 966 at 9:45 a.m. arriving in Anchorage at 11:25 a.m. and at my home at 11:55 a.m. In summary, I witnessed successful BOPE tests on Sohio's B--2 0. ¥, 02-001/~,(Rev.10/79) ~'STATE OF ALlS K& AIASKA OIL ~--CAS (/DNSERVATION CC~.~ZISSION B .O.P.E Inspection Report Inspector Operator ~ O/4t ~ Well ~- ~9 Location: Sec ~'l T ]IA/R/~ M U~ Fril linq Contractor ~~b'/*//9 ~'~R~ ~ Date Representative /~iaslng Set Representative' Location, Genera] . Wel 1 Sign Cenera 1 Housekeeping Peserve pit ___ ~/~. BOPE Stack Annular Preventer- Pipe Pams Blind Rams Choke Line Valves-- H.C.R. Valve Kil 1 Line Valves Check Valve__ Test Pressure Test Results: Failures_ ACCUMULATOR SYSTEM Full Charge Pressure .~:~z9 psig Pressure After Closure t ';'~"0 psig Pump incr. clos. pres. 200 psig. min~'~sec. ~ min ~ ~ sec. Full Charge Pressure Attained: N2/~S~.../~-O~i ~~/~! g~ ps ig Controls: ~ster Remote Kelly and Floor Safety Valves - Up~r Kelly Lo~er Kelly Bal 1 Type Ins ide BOP Choke Manifold No. Valves.__ .Test PresSure _~ gDO Test Pressure_ /=,~.~ Test Pressure ~ e~ ~-~ .Test Pres sare ,Test Pressure No. flanges A~justable Chokes ~ Hydrauically operated choke Test Time'-$,~/,%~, ,hfs Repair or Replacement of failed equipment to be made within ~" days and Inspector/Ccmmission office notified. .... · ~_ o ~/~ ,~,u~ ..~~~_~~ R~rks :,, ~-.~ ~ _ Di str ibut ion orig. - AO&CCC cc - Operator cc - Supervisor October 6, 1982 District Dril ling Engineer Sohio Alaska t~troleu~ Company Pouch 6-612 Anchorage, Alaska 99502 PruShoe Bay Unit B-20 (14-29-11-14) P~ ~ohio Alaska Petroleum Company Per.it ~o. 82-168 Btm, hole Loc. 994tNSL, 760~, Sec. 29, T11N, R14E, UPM Dear ~r. ~iley~ Enclosed is the approved application for per. it to drill the above referenced well. ~ell samples a-nd a ~ud log are not required. A continuous ~irectional survey is require~ as per 20 AAC 25.050(b)(5}. If available, a tape containing the digitized log information shall b~ ~ubmitted on all logs ~or copying except experimantal logs, velocity ~rveys and dipmeter ~arveys. Many rivers in Alaska and their drainage systems have been classified as i~rtant for the spawnin9 or migration of ana~romous fish. Operations in these areas are subject to AS i6.05.870 an~ the regulations promulgated thereunder (Title 5, Alaska A~ministrative Cocte }. Prior to commencing operations you ~y be contacte~ by the Habitat Coordinator's Office, Department of Fish and ~. Pollution of any waters of the ~tate is prohibited by AS 46, Chapter 3, Article 7 an~ the regulations promulgated thereunder (Title 18, Alaska A~ministrative Code, Chapter 70) and by the FeStal ~ter Pollution Control Act, as amended. Prior to c~encing operations you may be contacted by a representative of the D~partFent of Environm~ntal Conservation. To sift us in scheduling field work, please notif~ this office 24 hour~ ~ior to com~ncing installation of the blowout preven- tion equipment so that a representative of the Com~ssion may -2- October 6, 19~2 r~,tre~, please also n~ify this office 24 bouts ~rior to c~~cing equi~t in~tal~tion so t~t the C~s~ion ~y In the event of ~as~nsion or abandonment, please gave this D~partme. nt of Fish & Game, ~abita~ Section w/o encl. Departs.hr of ~nv/;on.~ntal Conservation w/o encl. CVC/olh SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: P©UCH 6-612 ANCHORAGE, ALASKA 99502 October 1, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: 'WRLT..'B-20 ' (14-29-11'14) ~PBU Enclosed are the following d~ts, in triplicate, along with our check for $100 to cover the permit filing fee. 1. Application for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram; 4. Surveyor's plat showing well location; 5. Directional map. If you have any questions, please call R. H. Reiley at 263-5183 or K. W. Kolthoff at 263-5176. Yours very truly, R. H. Reiley District Drilling Engineer encs cc: Well File. #17 OCT 0 1 1982 01~ & Gas Cons. Gommissio,q Anc~,oracje ~ STATE OF ALASKA ALASKA .LAND GAS CONSERVATION C?'"~/IMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL ~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE ~] MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum CompanY 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 564' SNL, 1895' WEL, Sec. 31, T11N, R14E, UPM At top of proposed producing interval (target) 900' NSL, 600' EWL, Sec. 29, TllN, R14E, UPM At total depth . 994' NSL, 760' EWL, SeC. 29, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Est. KBE = 75' AMSL I ADL 28310 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Safeoo Ins. 2975387 9. Unit or lease name Prudhoe Bay Unit 10. Well number B-20 (14-29-11-14) PBU 11. Field and pool Prudhoe Bay Amount $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line NW of Deadhorse 10 miles ~est of ADL 28309 - 4680 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9978' MD - 9216' TVD feet 2491 19. If deviated (see 20 AAC 25.050) 28°39' 120. Anticipated pressures KICK OFF POINT 3000 feet. MAXIMUM HOLE ANGLE ~1 (see 20 AAC 25.035 (c) (2) 15. Distance to nearest drilling or completed well B-4 1600 18. Approximate spud date October 25, 1982 $730 psig@~ Surface 4390 psig@ ~800 ft.:)iJ~) (TVD~ 21 Proposed Casing, Liner and Cementing Program CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT SIZE Hole I Casing 36 I 20x30 17 1/2 13 3/8 72# 12 1/4 9 5/8 47# 8 1/2 7 26# 22. Describe proposed program: Weight Insula- Grade I Couplingl Length ~ed CondUctor. I 80 n-80 IButt' I 2680 L-80 IButt. I '9022 I MD TOP TVD Suffice Surf{tce Su.rfac~ I I 8772~ 8159 t ,, 110 2680 9022 , MD BOTTOM TVD 110 2680 8378 9978 9216 (include stage data) 8 cu.yds, concrete 3720 cu.ft. Permafros- 1242 cu. ft. Class G; 130 cu. ft. PermafroS' 307 cu. ft. Class G w/IU% salt See attached proposed drilling' and completion program. As shown on the attached directioD~l plat, we are aware of the potential intersection problems which can result frc[n the drilling of this well. If during actual drilling operations, one of these intersections is approached within hazardous proximity, the well to be intersected will be shut-in. ;~3,. I hereby certify that the fpregoing is true and correct to,the best of my knowledge " ~ q~ ~(%~' 1/~_ -__~. ~/_~~istrict Drill~g ~g~eer The space below for Commission use R, H. ~iley RECEIVED 0il & Gas Cons. aec~orage DATE CONDITIONS OF APPROVAL Samples required []YES Permit number APPROVED BY Mud log required OYES ~NO Directional Survey required ~YES i-IN• APl number 50. o~-9 SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE /~/~ ~-- by order of the Commission II Form 10J,01 Submit in triplicate W~,T. B-20 (14-29-11-14) PBU PROPOSED D~II.T.TNG AND COMPLETION PROGRAM Dry bucket 36" hole to 80' below ground level and c~m~_nt 20" x 30" insulated conductor to surface using 8 cu. yds. concrete, Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Rermaf~st~'~II c_ement. Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. ~udmum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil colun~ to 8800' TVDss. Vertically drill 12.1/4" hole to 3000 ' TVD and directionally drill 12 1/4" hole to 8382 ' TVD. Run 9 5/8" 479 L-80 Buttress casing to 8378' TVD and ce~_nt first stage with 1242 cu. ft. Class G cement. Cement second stage through D.V. packer collar at 2600 ' with 130 cu. ft. Pexmafrost C: cement. The 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9216' TVD. Cemant 7" liner to 250 ' inside 9 5/8" casing shoe with 307 cu. ft. Class G cement with 18% salt. Run 5 1/2" 179 L-80 A/B ~bd Buttress IPC tubing with 13 gas lift mandrels and a production packer assembly at 8115 ' TVD. A subsurface safety valve with dual control lines will be placed at 2150 '. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. perforations to be submitted on Sundry Notice to follow. Details of proposed RECEIVED OCT 0 0~1 & Gas Cons. ~horage B.O.P~STACK CONFIGU ~P~TION 5/8" TRIPLE RAM STACK i iii i i i i 500,0. P,S~, W,P,. DRILLING ANNULAR PREVENTER PIPE RAMS BLIND RAMS 2" KILL LINE CHECK GATE GATE DRILLING SPOOL PIPE RAMS CHOKE LINE GATE HYDR. ASST. GATE ICT° ] 1982 ltlask~it & Gas Cons. Cor~ . '~'" - /InChorage ~188io0 III i 4o n; OI 04' OI C)2~ , OI oa! I 20 30 40 I0 20 ~0 :5'i B- 24 ~ (Proposed) B-25 (Proposed) ,, i3O 29 -I I 't B- 18 [Ae.-Built) -- L. AT~ = ?0° I~S' 14.05", LONG. -~ 1~.8° 4~)' 32.78' x= Y 5,950,300 B- 22 (Pro poled PORTION OF T II N, R 14 E, U.M. SCALE 1"=1/2 MILE CERTIFICATE OF SURVEYOR T, ION. FLARE Pit r/S- $1-II- r$S - $2- i/- '12- SS- II- I~) '/4- $/-/I-/,t! ~,~4- $/- //- 14) PAD DETAIL SCALE I'": 300' I hereby certify that I am properly registered to , practice land surveying in the ,State of Alaska and that this plat represents a location survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and al! dimensions and other details are correct. Bottom hole locations are furnished by others. Date :: ~RVEYoR~ - RECEIVED OCT 0 ! 1982 Alaska Oil & Gas Cons. Commission Anchorage Retvi~, B- 18 Surtoce i. ocetion f,om proposed lo as- built. Add P,opo~ed BHL B.21,22,Z;~,Z4,&25 Revise B-la ~urface IDeation, odd propoled bottom hole location B - 20 REVI~E B. 18 & B- 19 BHL. Sheet 3, of $ ~1. I I II II I I ] II III I. I II II PAD "B" EXTENSION Located In NE I/4 PROTRACTED SEC. SI.T. I! N.,R. 14 E,,UMIAT MERIDIAN,AK. Surveyed for SOHIO ALASKA PETROLEUM CO. _ IIIIII I IIII II I[ IIIII I I I I I I Surveyed by F.M. LINDSEY & ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2§02 West Northern Lighte Boulevard Box 4-081 Anehnrnnn Alaska INTERSECTION'' iMAP WELL B-20 (14-29-11-14) D NOTE - ALL Bi~l*Tt~ ZL~ FF.~7 l~ t~ELL¥ BL~flIflG (KB) GIB4.7 1421,4 G2GI, g 13~G.2 -BOT.G 3444.0 .44.0 4~?,G 416.1, S7P,S 4143.4 3~.e 2G35.4 89,G -Gel.? RECEIVED OCT 0 1 1982 Alaska Oil & Gas Cons. C, ommjs$io~l Anchorage t UE~6IGN 2ERO St~.2 9?6.4 47e?,9 ?aS.! -464.l 3446.6 44.5 ~9.t 41e.? 414~.7 3~4..G 3S03.G, G3.4 -G33.0 OCT o ~ Atas~ Oil & Gas'COnS. commission CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. /? ~ '~/- ITEM APPROVE DATE (1) Fee / '(2 th~u 8) 1. Is the permit fee attached ......................................... 2. Is well to be located in a defined pool ................ 3o Is well located proper distance from property line ..... 4. Is well located proper distance from other wells ........ 5-. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is well bore plat included .. 7. Is operator the only affected party ..... ~ ............... 8. Can permit be approved befOre ten-day wait .............. Admin/~/(,,~_.w 'L ,I,-/-~,- 9. (3) '(9 th~u 11) 10. 11. ~/f2 'thr u 20) 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. YE S NO REMARKS (5) BOPE ~2i- thru 24) Does operator have a bond in force .................................. "~ ...... Is a conservation order needed ....... , .............................. .Is administrative approval needed .................................... Is conductor string provided ....................................... ~ Is enough cement used to circulate on conductor and surface ......... 4 Will cement tie in surface and intermediate or production strings ... ~ Will cement cover all known productive horizons ..................... ~ Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst..~ Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... ~ Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to ~. psig . Does the choke manifold comply w/API RP-53 (Feb.78) .................. (6) Add: z -' Z z.- 25. Additional requirements ............................................. Additional Remarks: rev: 08/19/82 INITIAL GEO. UNIT ON/OFF~ pOOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX~ o. No 'special 'effort has been made to chronologically organize this category of information. .o B - 20 PRUDHOE BAY RECEIVE NOV Z~O 1995 01t & Gas Cons. ::::::::::::::::::::::::::::::::::::::::::::: ...... ::::::::::::::::::::::::: {{ { t~ q'-; ~i: · : .::; :;: :.;:: ;1: :~.. :1; ..... ,. ,.,~¢ ...... :::::::::::::::::::::::::::: .,. ......... , ....H.'~ ~,..:~ ...... ::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::: :::::::::::::::::::::::::: ~l: ~:::::'& ::::~:: x;; ::::::::::::::::::::: ::::::::::::::::::::: :::::::::::::::::::::::: ========================================== ........................... ~ ...... ~' :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::: :~:::::::::;:: Run 1: 20 - October - 1995 CNIGR Cased Hole 1N~.STERN ATLAS 9200 9834 Logging Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD B-20 500292084200 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 07-NOV-95 1539.04 W.R. BARKER J. SHARP 31 liN 14E 564 1895 80.03 79.00 36.60 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9189.0 47.00 7.000 10040.0 26.00 5.500 8848.0 17.00 4.500 8997.0 12.60 BASELINE DEPTH 9197.5 9200.0 9201.0 9203.0 '9218.5 9222.5 9226.5 '9235.0 9236.0 9236.5 9252.0 9253.0 9254.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 9195.5 9198.0 9198.5 9200.5 9218.0 9222.0 9227.0 9235.5 9236.0 9236.5 9252.5 9253.5 9254.0 BHCS GR 2 1 08-NOV-82 SWS 9265.0 9269.5 9272.0 9272.5 9278.0 9279.0 9316.0 9321.0 9322.0 9348.0 9349.5 9357.5 9359.0 9362.0 9364.0 9364.5 9365.0 9366.0 9411.0 9417.0 9418.0 9419.0 9427.0 9428.0 9430.5 9435.0 9462.0 9468.0 9472.5 9476.5 9479.5 9480.0 9487.5 9488.5 9492.5 9494.5 9496.5 9497.5 9507.5 9510.0 9510.5 9512.0 9522.0 9522.5 9537.5 9538.5 9546.5 9547.0 9548.0 9549.0 9549.5 9554.0 9554.5 9555.0 9556.0 9565.5 9566.0 9566.5 9567.5 9569.0 9265.0 9270.0 9272.5 9273.5 9279.0 9279.5 9316.5 9320.5 9321.0 9347.0 9349.0 9357.0 9358.0 9361.5 9363.5 9364.5 9365.0 9365.5 9410.5 9417.5 9418.5 9419.0 9427.0 9427.5 9430.0 9435.0 9462.0 9468.5 9472.5 9475.5 9478.0 9478.5 9486.0 9486.5 9490.5 9493.5 9495.5 9496.0 9506.0 9509.0 9509.5 9510.5 9520.5 9521.5 9536.5 9537.0 9545.0 9546.0 9547.0 9547.5 9548.5 9553.0 9554.0 9554.5 9555.0 9564.5 9565.5 9566.0 9566.5 9568.0 9677.0 9683.5 9688.5 9698.5 9699.5 9701.0 9708.5 9724.0 9724.5 9727.0 9729.0 9729.5 9730.5 9732.5 9757.5 9758.0 9759.0 9775.5 9794.0 9803.5 9804.5 9806.5 9807.0 9807.5 9808.5 9809.5 9816.5 9818.0 9818.5 $ REMARKS: 9676.5 9684.0 9689.5 9699.5 9700.0 9701.5 9708.5 9724.0 9725.0 9727.5 9730.0 9730.5 9731.0 9733.0 9756.0 9756.5 9757.0 9773.5 9794.0 9803.5 9804.0 9806.0 9807.0 9807.5 9808.0 9809.0 9816.5 9818.0 9818.5 CN/GR Cased Hole. LOG WAS TIED INTO BHCA DATED 21-NOV-82. WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NET WATERRATE FORMATION GAS RATE GOR LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE 08-OCT-95 HOURS 4.0 MBPD 1.04 MBOPD 0.86 MBWPD 0.18 MMSCFD 7.33 SCF/STB 8533 MMSCFD 0.00 PSIG 0 SCF/STB 8533 SCF/STB 7078 94.3 PSIG 198 105 17.1 MANIFOLD TEMPERATURE DEGF WATER CUT (CALC) PCNT PUMPED 130 BBLS SEAWATER AND 50 BBLS DIESEL BEFORE LOGGING WELL. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA. RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: I EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS'TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9200.0 9824.0 9200.0 9834.0 BASELINE DEPTH NPHI 9197.5 9195.5 9200.0 9198.0 9201.0 9198.5 9203.0 9200.5 9218.5 9218.0 9222.5 9222.0 9226.5 9227.0 9235.0 9235.5 9236.0 9236.0 9236.5 9236.5 9252.0 9252.5 9253.0 9253.5 9254.0 9254.0 9265.0 9265.0 9269.5 9270.0 9272.0 9272.5 9272.5 9273.5 9278.0 9279.0 9279.0 9279.5 9291.5 9291.5 9307.5 9307.5 9316.0 9316.5 9321.0 9320.5 9322.0 9321.0 9335.5 9335.0 9348.0 9347.0 9349.5 9349.0 9353.0 9352.0 9357.5 9357.0 9359.0 9358.0 9362.0 9361.5 9364.0 9363.5 9364.5 9364.5 9365.0 9365.0 9366.0 9365.5 9370.5 9370.0 9386.5 9386.0 9397.0 9397.0 9406.0 9405.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... 9413.0 9417.0 9418.0 9419.0 9427.0 9428.0 9430.5 9440.5 9456.0 9462.0 9467.5 9470.0 9472.5 9476.5 9479.5 9480.0 9487.5 9488.5 9492.5 9494.5 9496.5 9497.5 9502.0 9507.5 9510.0 9510.5 9512.0 9517.0 9520.0 9522.0 9522.5 9525.0 9537.5 9538.5 9546.5 9547.0 9548.0 9549.0 9549.5 9554.0 9554.5 9555.0 9556.0 9561.0 9565.5 9566.0 9566.5 9567.5 9569.0 9677.0 9683.5 9694.5 9699.5 9701.0 9708.5 9724.0 9724.5 9727.0 9729.0 9729.5 9412.0 9417.5 9418.5 9419.0 9427.0 9427.5 9430.0 9439.5 94561.0 9462.0 9468.0 9470.0 9472.5 9475.5 9478.0 9478.5 9486.0 9486.5 9490.5 9493.5 9495.5 9496.0 9500.0 9506.0 9509.0 9509.5 9510.5 9515.0 9518.0 9520.5 9521.5 9523.5 9536.5 9537.0 9545.0 9546.0 9547.0 9547.5 9548.5 9553.0 9554.0 9554.5 9555.0 9559.0 9564.5 9565.5 9566.0 9566.5 9568.0 9676.5 9684.0 9694.0 9700.0 9701.5 9708.5 9724.0 9725.0 9727.5 9730.0 9730.5 9730.5 9732.5 9757.5 9758.0 9759.0 9775.5 9794.0 9803.5 9804.5 9808.0 9809.5 9816.5 9818.0 9818.5 9823.5 9826.0 $ REMARKS: 9731.0 9733.0 9756.0 9756.5 9757.0 9773.5 9794.0 9803.5 9804.0 9807.0 9809.0 9816.5 9818.0 9818.5 9823.5 9826.5 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B. OUT $ : BP EXPLORATION (ALASKA) : .B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS '4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 29 Tape File Start Depth = 9855.000000 Tape File End Depth = 9155.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7006 datums Tape Subfile: 2 368 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS 'PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9190.0 9824.0 '9200.0 9834.0 BASELINE DEPTH 9202.5 9217.0 9220.5 9221.0 9223.0 9224.5 9225.0 9227.0 9228.0 9230.5 9231.0 9233.5 9234.0 9235.0 9238.5 9240.5 9241.0 9242.5 9243.0 9247.5 9248.5 9249.5 9251.0 9254.0 9256.5 9261.5 9263.5 9264.0 9264.5 9265.0 9268.5 9269.0 9271.5 9278.0 9282.0 9286.0 9287.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... NPHI GRCH 9201.0 9216.5 9220.0 9221.0 9223.0 9224.5 9225.5 9228.0 9228.5 9231.0 9232.0 9234.5 9234.5 9235.0 9238.0 9240.5 9241.5 9243.0 9244.0 9248.5 9249.0 9249.5 9250.5 9254.0 9257.0 9261.0 9264.0 9264.0 9264.5 9265.0 9269.5 9270.5 9272.5 9279.0 9282.5 9287.0 9287.5 9297.0 9298.0 9314.0 9316.0 9320.5 9321.5 9325.0 9336.0 9338.0 9346.0 9346.5 9347.5 9348.0 9349.0 9355.0 9357.5 9362.5 9364.0 9365.0 9366.0 9367.0 9368.0 9368.5 9372.5 9373.0 9376.0 9376.5 9377.0 9378.0 9392.5 9393.0 9399.0 9400.0 9411.5 9412.5 9413.5 9414.0 9417.5 9418.0 9419.0 9420.0 9425.5 9428.0 9429.0 9429.5 9432.5 9434.5 9435.0 9439.5 9444.5 9445.5 9453.5 9456.0 9457.5 9465.5 9466.0 9469.5 9472.0 9473.0 9474.0 9316.5 9320.5 9323.5 9345.5 9348.5 9365.5 9366.0 9367.0 9368.0 9375.5 9376.5 9377.0 9377.5 9392.0 9393.0 9399.0 9399.5 9411.0 9417.5 9428.0 9428.5 9434.0 9435.0 9439.5 9455.0 9472.5 9473.5 9297.5 9298.0 9314.0 9320.5 9321.0 9335.5 9337.5 9346.0 9346.5 9347.0 9354.5 9357.0 9362.5 9364.0 9364.5 9372.0 9373.0 9377.0 9377.5 9412.0 9412.5 9413.0 9418.5 9419.5 9420.0 9425.5 9428.5 9429.0 9431.0 9433.0 9434.0 9443.5 9444.0 9453.0 9457.0 9466.0 9466.5 9469.5 9471.5 9475.0 9476.0 9476.5 9477.0 9480.5 9481.0 9481.5 9483.0 9483.5 9484.5 9485.0 9485.5 9486.5 9493.5 9495.0 9497.5 9498.0 9501.5 9502.5 9506.0 9506.5 9510.5 9512.0 9517.5 9518.5 9519.5 9522.0 9522.5 9524.0 9530.5 9531.0 9532.0 9534.0 9539.0 9547.5 9548.5 9550.0 9553.5 9554.0 9555.0 9555.5 9556.5 9559.0 9559.5 9560.0 9561.0 9565.0 9568.0 9573.0 9574.0 9574.5 9578.5 9579.0 9580.0 9595.5 9597.0 9607.0 9608.5 9610.5 9612.0 9474.0 9475.0 9475.5 9479.0 9479.5 9480.0 9483.0 9483.5 9493.5 9516.0 9518.0 9521.0 9523.0 9529.5 9537.5 9548.5 9554.0 9567.0 9606.5 9610.0 9611.0 9475.0 9481.5 9482.5 9484.0 9485.5 9491.5 9495.5 9496.5 9500.0 9500.5 9504.5 9505.5 9509.5 9510.0 9516.5 9520.5 9529.5 9530.0 9532.5 9546.0 9546.5 9551.0 9552.5 9554.0 9554.5 9557.0 9558.0 9558.5 9559.0 9563.0 9566.0 9571.0 9571.5 9572.0 9578.0 9578.5 9579.0 9594.5 9596.5 9608.0 9611.0 9613.5 9616.5 9630.5 9652.0 9655.5 9660.0 9671.0 9680.0 9687.0 9687.5 9689.5 9700.5 9702.0 9702.5 9703.5 9709.0 9711.5 9713.0 9714.0 9715.0 9723.0 9723.5 9724.0 9725.5 9726.0 9726.5 9729.0 9731.0 9731.5 9732.0 9741.5 9745.0 9746.0 9747.0 9747.5 9748.5 9749.0 9750.0 9757.5 9764.5 9768.5 9775.0 9775.5 9776.0 9776.5 9780.0 9781.0 9784.5 9791.5 9792.5 9794.5 9797.0 9801.0 9802.0 9804.0 9805.0 9806.0 9806.5 9809.0 9810.0 9612 · 9628.5 9652.0 9655.0 9672.5 9680.0 9691.0 9702.0 9711.0 9713.5 9714.0 9714.5 9715.0 9723.0 9723.5 9725.0 9726.0 9726.5 9732.5 9733.0 9741.0 9744.5 9745.0 9747.5 9748.5 9749.5 9755.5 9773.0 9775.0 9776.0 9792.5 9804.0 9804.5 9805.5 9806.5 9809.0 9809.5 9612.5 9615.0 9659.5 9686.5 9687.5 9702.0 9703.0 9704.0 9723.5 9726.5 9729.5 9731.5 9747.0 9747.5 9749.5 9762.5 9766.5 9773.5 9774.5 9778.5 9779.0 9782.5 9790.5 9794.0 9796.5 9800.5 9801.0 9811.5 9812.5 9816.0 9816.5 9824.5 9827.5 9830.0 $ REMARKS: 9811.0 9816.0 9816.5 9811.5 9824.5 9827.5 9829.5 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT /??MATCH2B. OUT $ : BP EXPLORATION (ALASKA) : B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 29 1006 BYTES * Tape File Start Depth = 9855.000000 Tape File End Depth = 9155.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7006 datums Tape Subfile: 3 287 records... Minimum record length: Maximum record length: 26 bytes 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 9190.0 9824.0 2418 9200.0 9834.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRCH NPHI 9204.0 9204.0 9205.0 9204.5 9208.5 9208.5 9218.5 9218.5 9219.5 9219.0 9220.5 9220.0 9221.0 9221.0 9220.5 9221.5 9221.0 9222.0 9222.0 9222.5 9222.5 9223.5 9224.0 9224.0 9224.0 9225.0 9224.5 9225.5 9225.0 9226.0 9226.0 9232.5 9232.5 9234.5 9235.0 9235.5 9235.5 9236.0 9236.5 9236.5 9237.0 9245.5 9243.0 9250.5 9248.5 9251.0 9250.5 9252.5 9252.5 9253.5 9253.0 9254.0 9254.0 9256.0 9256.0 9256.5 9257.0 9262.5 9263.0 9263.5 9263.5 9264.0 9264.0 9265.0 9265.0 9268.5 9269.0 9269.5 9272.0 9272.5 9272.5 9273.0 9276.0 9276.5 9276.5 9277.5 9277.0 9278.0 9282.5 9293.0 9313.0 9314.5 9315.0 9315.5 9316.0 9316.5 9320.0 9321.0 9322.5 9323.5 9324.5 9325.5 9326.0 9344.5 9346.0 9348.0 9349.0 9357.5 9358.5 9362.5 9368.5 9369.5 9373.0 9373.5 9375.0 9379.5 9380.5 9386.0 9390.0 9394.0 9398.0 9399.0 9402.5 9403.5 9411.0 9411.5 9412.0 9414.0 9417.0 9417.5 9418.5 9419.5 9420.5 9425.5 9432.0 9435.0 9435.5 9444.0 9446.5 9448.5 9449.0 9468.0 9469.0 9472.0 9472.5 9473.0 9278.0 9278.5 9316.0 9316.5 9320.5 9322.0 9322.5 9347.0 9348.5 9357.0 9357.5 9362.0 9368.0 9368.5 9372.0 9373.0 9410.5 9417.5 9418.0 9418.5 9419.5 9420.0 9434.5 9435.5 9444.0 9448.0 9448.5 9472.5 9473.0 9279.0 9283.0 9293.0 9313.0 9315.0 9315.5 9316.0 9320.0 9320.5 9324.0 9324.5 9325.5 9344.0 9345.0 9361.0 9374.5 9379.5 9380.0 9386.0 9389.5 9394.5 9398.5 9399.0 9402.5 9403.0 9410.5 9411.5 9413.5 9417.0 9425.5 9432.0 9434.0 9445.5 9468.0 9469.0 9471.5 9472.0 9473.5 9474.0 9475.5 9476.5 9477.0 9483.5 9484.0 9488.0 9490.5 9493.0 9500.0 9501.0 9502.0 9503.5 9506.0 9510.5 9512.5 9520.0 9520.5 9523.0 9525.0 9527.0 9528.5 9529.5 9549.0 9549.5 9551.0 9555.5 9565.5 9566.5 9567.0 9568.5 9569.5 9570.0 9578.5 9581.5 9587.0 9589.0 9612.5 9637.0 9640.5 9644.0 9655.5 9660.5 9663.0 9676.0 9678.0 9680.5 9687.0 9689.0 9694.5 9700.0 9703.0 9703.5 9707.0 9708.0 9710.5 9712.5 9715.5 9719.0 9473.5 9475.5 9490.5 9500.5 9518.5 9523.5 9526.0 9527.5 9528.0 9547.5 9548.5 9564.5 9565.0 9566.5 9568.0 9655.0 9680.5 9690.0 9695.5 9712.5 9719.0 9472.5 9474.5 9475.0 9482.0 9483.0 9487.0 9488.5 9491.0 9498.5 9499.0 9501.5 9505.0 9509.5 9510.0 9518.0 9521.5 9549.5 9554.0 9568.0 9569.0 9577.5 9579.5 9585.0 9586.5 9611.5 9636.0 9639.5 9642.5 9660.0 9663.0 9675.5 9677.5 9687.0 9700.0 9704.0 9705.0 9708.5 9709.0 9711.5 9712.0 9716.0 9729.0 9731.0 9731.5 9741.0 9747.5 9749.0 9750.0 9757.5 9762.0 9770.0 9770.5 9774.0 9775.5 9776.0 9776.5 9778.5 9784.5 9794.0 9795.0 9797.5 9798.0 9802.0 9805.5 9808.0 9810.0 9810.5 9812.0 9816.5 9820.5 9823.5 9827.5 9830.0 $ REMARKS: 9730.0 9731.5 9732.5 9740.5 9747.0 9748.5 9749.0 9755.5 9760.0 9768.0 9768.5 9772.0 9773.5 9774.5 9775.0 9774.5 9776.5 9782.5 9794.0 9793.5 9796.0 9797.5 9801.5 9804.5 9808.0 9809.5 9810.0 9811.0 9816.5 9732.5 9821.0 9733.0 9823.5 9741.0 9828.0 9744.5 9830.5 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH3A. OUT / ? ?MATCH3 B. OUT $ CN : BP EXPLORATION WN : B-20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# '64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: (ALASKA) Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 29 4 4 42 995 99 4 4 42 995 99 4 4 42 995 99 4 4 42 995 99 16 1006 BYTES * -Tape File Start Depth = 9855.000000 Tape File End Depth = 9155.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14012 datums Tape Subfile: 4 252 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES COmpensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 2 NPHI CNAV 68 1 PU-S 3 FUCT CNAV 68 1 CPS 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 29 Tape File Start Depth = 9855.000000 Tape File End Depth = 9155.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14012 datums Tape Subfile: 5 52 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9196.0 2418 9196.0 $ LOG HEADER DATA STOP DEPTH 9838.0 9848.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 20-OCT-95 FSYS REV. J001 VER. 1.1 1152 20-OCT-95 9920.0 9836.0 9200.0 9834.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA 0.000 10040.0 0.0 SEAWATER/DI ESEL 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-S 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 cPs 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 100 Tape File Start Depth = 9851.000000 Tape File End Depth = 9155.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 39078 datums Tape Subfile: 6 Minimum record length: Maximum record length: 176 records... 62 bytes 1014 bytes Tape SUbfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9172.0 2418 9182.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9837.0 9847.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 20-OCT-95 FSYS REV. J001 VER. 1.1 1235 20-OCT-95 9920.0 9836.0 9200.0 9834.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA 0.000 10040.0 0.0 SEAWATER/SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS) : 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units 1 GR 2418 68 1 2 CNC 2418 68 1 3 CN 2418 68 1 4 LSN 2418 68 1 5 SSN 2418 68 1 6 'CCL 2418 68 1 7 SPD 2418 68 1 8 TEN 2418 68 1 GAPI PU-S PU-L CPS CPS F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 99 Tape File Start Depth = 9850.000000 Tape File End Depth = 9161.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 38826 datums Tape Subfile: 7 Minimum record length: Maximum record length: 175 records... 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9183.0 2418 9193.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SBAR PCM GR CN $ SWIVEL SUB SINKER BAR PCM/CCL GAMMA RAY STOP DEPTH 9837.0 9847.0 COMPENSATED NEUTRON 20-OCT-95 FSYS REV. J001 VER. 1.1 1315 20-OCT-95 9920.0 9836.0 9200.0 9834.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10040.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER/DIESEL 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE cORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NOP34ALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH.SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-20 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code.Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-S 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 mmmm~mm * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 97 Tape File Start Depth = 9851.000000 Tape File End Depth = 9178.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 63316 datums Tape Subfile: $ Minimum record length: Maximum record length: 173 records... 62 bytes 1014 bytes Tape Subfile 9 is type: LIS 95/11/ 7 01 **** REEL TRAILER **** 95/11/ 7 01 Tape Subfile: 9 .2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 7 NOV 95 4:08p · Elapsed execution time = 2.64 seconds. SYSTEM RETURN CODE = 0 c~ B - 20 PRUDHOE BAY JUN ~ 1 1~ Alaska 0il & Gas Cons. Anchorage C°r~[8.~ ~- Run 1' 30 - May - 1994 CN/GR Cased Hole 1824 Atlas Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: OWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING B - 20 (14-29-11-14) 500292084200 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 30-MAY-94 1539.03 R. ECK R. MAYS 31 liN 14E 564 1895 80.03 79.00 36.60 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9189.0 47.00 7.000 10040.0 26.00 5.500 8824.0 17.00 4.500 8997.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: BHCS PBU CURVE CODE: GR RUN NUMBER: 2 PASS NUMBER: 1 DATE LOGGED: 08-NOV-82 LOGGING COMPANY: SWS BASELINE DEPTH GRCH 9200.5 9205.0 9201.5 9206.0 9206.0 9210.0 9213.0 9216.0 9218.5 9221.5 9221.5 9224.5 9230.0 9233.5 9234.5 9238.0 9235.5 9238.5 9236.0 9239.0 9252.0 9255.5 9253.0 9256.5 EQUIVALENT UNSHIFTED DEPTH - 9254.0 9264.5 9270.5 9284.0 9286.5 9299.0 9300.0 9316.0 9321.0 9357.5 9363.5 9365.0 9366.0 9375.5 9376.5 9377.0 9377.5 9380.0 9391.5 9393.5 9417.5 9418.5 9420.0 9421.0 9430.0 9440.5 9444.5 9453.0 9477.0 9492.0 9495.5 9504.5 9505.5 9519.0 9526.0 9556.5 9557.0 9557.5 9559.5 9560.0 9561.5 9562.5 9566.5 9677.0 9692.5 9693.5 9699.0 9712.0 9713.0 9714.5 9715.5 9723.5 9724.0 9725.0 9725.5 9726.5 9734.0 9743.0 9757.5 9758.5 9257.0 9267.5 9274.5 9287.5 9291.0 9303.0 9303.5 9319.5 9323.5 9360.0 9366.5 9368.0 9368.5 9378.0 9378.5 9379.5 9380.0 9383.0 9394.5 9396.0 9420.0 9422.0 9423.5 9424.0 9433.0 9443.5 9448.0 9456.0 9478.5 9493.5 9497.5 9506.5 9507.0 9520.5 9528.0 9558.5 9559.0 9559.5 9561.5 9562.5 9564.0 9564.5 9568.5 9684.0 9697.0 9698.0 9703.0 9716.0 9716.5 9718.0 9718.5 9726.5 9727.5 9728.5 9729.5 9730,5 9737.5 9745.0 9759.5 9760.0 9776.5 9795.0 9803.0 9804.5 9808.0 9815.0 $ REMARKS: 9778.0 9798.0 9806.0 9807.0 9810.0 9815.5 CN/GR Cased Hole. LOG TIED TO BHCS DATED 21-NOV-82. PRODUCTION TEST DATA (07-MAY-94): GRF = 1.25 MBPD OIL RATE = 1.09 MBOPD CHOKE = 96 GOR = 2992 WATER CUT = 13% MANIFOLD PRESSURE = 212 PSIG @ 103 DEGF DEVIATION @ PERFS = 16.5 DEG. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER CORRECTION = 10 625" CHISM FILTERING OFF, CASING CORRECTIONS OFF, SALINITY = 0 PPM. OPEN HOLE GAMMA RAY FOR DEPTH MATCHING DOWNLOADED FROM BP EXPLORATION UPS/CSS ON 14-JUN-94. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9200.0 2418 9200.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 9200.5 9201.5 9206.0 9213.0 9218.5 9221.5 9230.0 9234.5 9235.5 9236.0 9252.0 9253.0 9254.0 9256.0 9259.0 9262.0 9264.5 9270.5 9279.0 9284.0 9286.5 9299.0 9300.0 9316.0 9321.0 9335.0 9353.0 9357.5 9363.5 9365.0 9366.0 9371.0 9375.5 9376.5 9377.0 9377.5 9380.0 9386.5 9390.5 NPHI 9205.0 9206.0 9210.0 9214.0 9221.5 9224.5 9233.5 9238.0 9238.5 9239.0 9255.5 9256.5 9257.0 9259.0 9262.0 9266.0 9267.5 9274.5 9282.5 9287.5 9291.0 9303.0 9303.5 9319.5 9323.5 9337.5 9355.0 9360.0 9366.5 9368.0 9368.5 9372.5 9378.0 9378.5 9379.5 9380.0 9383.0 9388.5 9392.5 for each run in separate files. STOP DEPTH 9816.0 9824.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH -- 9397.0 9406.5 9425.0 9429.0 9440.5 9447.0 9449.5 9463.0 9477.0 9480.0 9501.5 9511.0 9515.0 9517.5 9526.5 9541.0 9544.5 9561.0 9688.5 9694.5 9699.0 9712.0 9713.0 9714.5 9715.5 9719.0 9723.5 9724.0 9725.0 9725.5 9726.5 9734.0 9743.0 9747.0 9757.5 9758.5 9761.5 9764.5 9768.5 9776.5 9795.0 9803.0 9804.5 9808.0 9812.5 REMARKS: 9400.0 9408.5 9427.5 9431.5 9443.0 9448.5 9451.5 9465.0 9478.5 9480.5 9501.5 9510.5 9514.5 9518.0 9526.5 9542.5 9546.0 9561.0 9693.0 9697.5 9702.5 9716.0 9716.5 9718.0 9718.5 9722.0 9726.5 9727.5 9728.5 9729.5 9730.5 9737.5 9745.0 9748.0 9759.5 9760.0 9763.0 9765.5 9769.5 9778.0 9798.0 9806.0 9807.0 9810.0 9814.5 PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B. OUT $ : BP EXPLORATION : B - 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S, 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 32 Tape File Start Depth = 9839.000000 Tape File End Depth = 9183.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7879 datums Tape Subfile: 2 310 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9201.0 9816.0 9201.0 9824.0 BASELINE DEPTH GRCH 9213.0 9212.5 9218.5 9220.0 9219.5 9228.0 9240.5 9239.5 9253.5 9257.5 9257.0 9262.0 9261.0 9262.5 9268.0 9267.5 9270.0 9271.5 9271.5 9272.5 9273.0 9273.0 9282.0 9282.0 9282.5 9285.0 9286.5 9286.5 9288.5 9291.0 9295.5 9297.0 9299.0 9300.0 9301.0 9300.5 9301.5 9302.5 9304.5 9304.5 9311.5 9312.5 9313.0 9313.0 9315.0 9316.5 9316.0 9319.0 9321.0 9319.5 9326.0 9326.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9211.0 9217.5 9227.5 9253.5 9257.0 9262.0 9270.0 9271.5 9272.0 9282.0 9285.0 9288.5 9291.5 9295.5 9297.5 9299.5 9300.0 9301.5 9302.0 9311.0 9311.5 9312.5 9314.5 9317.5 9324.5 9325.5 9328.0 9329.5 9330.5 9335.5 9344.0 9345.0 9346.5 9353.0 9362.5 9363.0 9364.0 9365.0 9366.0 9371.0 9373.0 9375.0 9376.5 9380.5 9381.5 9386.5 9397.0 9406.0 9410.5 9418.5 9419.0 9420.0 9421.0 9426.5 9427.5 9429.5 9430.0 9439.0 9440.5 9444.0 9454.5 9456.5 9460.0 9462.0 9462.5 9463.5 9474.0 9477.0 9477.5 9478.5 9479.0 9479.5 9480.0 9482.0 9483.0 9483.5 9487.5 9488.5 9490.0 9490.5 9491.5 9495.5 9497.5 9498.0 9498.5 9506.0 9326.5 9334.0 9351.5 9369.5 9371.5 9380.0 9385.0 9395.5 9404.5 9419.0 9419.5 9428.0 9439.0 9460.5 9477.0 9480.5 9493.0 9503.5 9328.5 9329.0 9342.5 9343.0 9344.5 9362.0 9362.5 9363.0 9363.5 9364.0 9373.0 9375.0 9379.0 9379.5 9408.5 9417.5 9418.0 9418.5 9425.0 9425.5 9428.0 9436.5 9441.5 9453.0 9455.0 9458.0 9459.5 9460.0 9460.5 9471.0 9473.5 9474.0 9474.5 9475.0 9476.0 9478.5 9479.0 9483.5 9484.0 9486.0 9486.5 9487.0 9493.0 9493.5 9494.0 9506.5 9507.5 9511.0 9511.5 9512.0 9513.0 9513.5 9514.0 9515.0 9518.0 9523.5 9524.0 9525.0 9526.0 9526.5 9527.0 9527.5 9530.0 9530.5 9531.0 9542.5 9549.5 9553.0 9554.0 9554.5 9555.5 9565.5 9566.5 9568.5 9579.0 9579.5 9580.5 9581 5 9583.5 9608.0 9617.0 9629.0 9630.5 9631.0 9632.0 9633.0 9634.0 9635.0 9641.0 9652.5 9677.0 9685.5 9689.0 9696.5 9699.5 9701.0 9701.5 9702.0 9703.0 9703.5 9704.0 9710.5 9712.5 9722.0 9722.5 9507.5 9509.5 9510.5 9520.5 9521.5 9522.5 9523.0 9524.0 9524.5 9525.0 9563.0 9563.5 9565.5 9653.0 9679.0 9695.5 9698.5 9710.0 9719.5 9720.5 9502.0 9502.5 9506.5 9507.5 9508.5 9509.5 9510.0 9510.5 9514.5 9525.5 9526.5 9527.0 9539.5 9546.5 9549.5 9550.0 9550.5 9551.0 9574.5 9575.5 9576.5 9577.0 9579.0 9605.0 9614.0 9627.0, 9628.5 9629.5 9630.5 9631.0 9632.0 9632.5 9638.5 9685.0 9688.5 9694.5 9699.0 9700.0 9700.5 9701.0 9702.0 9702.5 9710.5 9720.0 9723.0 9724.0 9734.5 9742.5 9743.0 9746.5 9754.0 9757.5 9765.0 9768.0 9768.5 9770.0 9773.0 9773.5 9776.0 9778.0 9779.0 9781.5 9784.0 9788.0 9791.5 9792.0 9793.0 9793.5 9794.0 9801.0 9802.0 9803.0 9806.5 9807.5 9808.5 9810.5 9811.0 $ REMARKS: 9721.0 9721.5 9732.5 9739.5 9740.5 9743.5 9750.5 9753.5 9760.5 9764.0 9764.5 9765.0 9766.0 9769.0 9770.0 9772.5 9774.5 9775.0 9777.5 9779.5 9784.5 9789.5 9790.0 9790.5 9791.0 9791.5 9800.5 9805.0 9808.0 9799.5 9800.5 9803.5 9804.5 9806.5 PASS 2. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ??MATCH2A. OUT / ? ?MATCH2 B. OUT $ : BP EXPLORATION : B- 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB * DATA RECORD (TYPE# 0) TotaI Data Records: 32 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 20 1014 BYTES * Tape File Start Depth = 9839.000000 Tape File End Depth = 9183.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7879 datums Tape Subfile: 3 256 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9200.0 9816.0 9200.0 9824.0 BASELINE DEPTH GRCH 9207.5 9210.0 9212.5 9213.0 9212.0 9215.5 9218.5 9220.0 9219.0 9233.5 9236.0 9235.0 9237.5 9236.5 9239.5 9240.5 9241.0 9242.5 9243.0 9243.5 9243.5 9245.0 9244.5 9247.0 9247.5 9246.5 9248.0 9249.0 9250.0 9251.5 9252.5 9251.5 9256.0 9258.5 9262.5. 9263.0 9263.5 9269.0 9270.0 9271.0 9270.0 9271.5 9271.0 9273.0 9274.0 9278.0 9277.5 9282.0 9284.5 9284.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9206.5 9208.5 9210.5 9214.5 9219.0 9232.0 9239.0 9239.5 ~9241.5 9242.5 9246.5 9247.0 9248.0 9249.5 9251.0 9255.0 9257.5 9261.5 9262.5 9263.0 9269.0 9270.0 9270.5 9272.5 9273.0 9281.0 9285 9295 9295 9297 9298 9298 9299 9302 9303 9305 9305 9311 9312 9313 9314 9315 9318 9320 9321 9325 9325 9326 9328 9328 9329 9330 9330 9335 9343 9344 9347 9353 9362 9363 9364 9365 9365 9366 9371 9373 9381 9383 9385 9386 9389 9391 9397 9398 9405 9411 9414 9417 9417 9418 9419 9420 9421 9422 9424 9429 .0 .0 .5 .0 .0 .5 .5 .0 .0 .0 .5 .5 .5 .0 .0 .5 .5 .5 .5 .0 .5 .5 .0 .5 .5 .0 .5 .0 .5 .5 .5 .0 .5 .0 .0 .0 .5 .5 .0 .0 .5 .5 .5 .5 .0 .5 .0 .5 .5 .0 .5 .0 .5 .0 .0 .0 .0 .5 .5 .5 9298.5 9299.0 9312.5 9313.0 9319.5 9320.0 9326.5 9333.5 9351.0 9369.0 9371.5 9380.0 9381.5 9385.0 9388.0 9395.0 9403.5 9409.0 9416.5 9417.0 9417.5 9421.0 9423.0 9284.5 9294.5 9295.5 9297.0 9297.5 9301.5 9302.0 9304.0 9305.0 9311.0 9311.5 9314.5 9317.0 9319.0 9319.5 9323.0 9325.0 9326.0 9326.5 9327.0 9327.5 9328.0 9329.0 9342.0 9342.5 9345.5 9362.0 9362.5 9363.0 9363.5 9364.0 9364.5 9383.5 9384.0 9389.0 9396.5 9412.5 9415.5 9418.5 9419.0 9427.5 9435.0 9439.5 9440.0 9445.0 9447.0 9449.0 9455.5 9456.5 9469.5 9473.0 9474.0 9474.5 9475.5 9476.0 9477.0 9483.0 9483.5 9484.5 9485.5 9486.5 9487.0 9490.0 9494.0 9495.0 9496.0 9496.5 9497.5 9501.5 9504.0 9504.5 9505.5 9506.5 9508.0 9511.0 9512.0 9512.5 9518.0 9518.5 9520.0 9521.5 9529.5 9530.0 9530.5 9531.5 9541.0 9541.5 9544.0 9549.5 955O.5 9551.0 9551.5 9554.5 9556.0 9556.5 9557.5 9560.5 9565.0 9566.0 9567.0 9568.0 9434.0 9438.5 9444.0 9445.0 9454.0 9473.0 9474.0 9480.0 9483.0 9492.5 9494.0 9494.5 9499.0 9501.0 9502.0 9503.0 9503.5 9507.5 9514.5 9516.5. 9518.5 9526.5 9527.0 9527.5 9538.5 9541.5 9546.5 9552.0 9562.5 9563.0 9565.0 9437.0 9446.0 9453.5 9467.0 9470.0 9470.5 9471.0 9471.5 9479.5 9480.0 9481.0 9481.5 9485.0 9490.0 9491.0 9491.5 9499.5 9500.5 9501.5 9502.0 9502.5 9507.0 9508.0 9514.5 9525.5 9526.5 9527.5 9537.5 9547.0 9549.5 9550.0 9552.0 9552.5 9553.0 9557.0 9560.5 9561.0 9561.5 9563.0 9571.5 9579.0 9580.5 9581.5 9584.0 9611.5 9612.5 9616.0 9618.5 9633.5 9635.5 9636.5 9637.5 9638.5 9639.0 9640.0 9640.5 9641.0 9642.0 9652.5 9676.5 9685.0 9689.0 9695.0 9696.0 9697.0 9699.0 9700.0 9701.5 9703.5 9704.5 9712.0 9712.5 9713.5 9714.5 9720.0 9725.0 9731.5 9734.5 9746.5 9749.0 9757.0 9761.5 9767.5 9768.0 9769.0 9771.0 9771.5 9774.0 9778.0 9779.0 9780.0 9785.5 9791.5 9792.0 9793.0 9794.0 9794.5 9795.5 9796.0 9653.0 9677.5 9694.0 9696.0 9698.0 9710.5 9711.0 9711.5 9712.5 9717.5 9722.5 9732.0 9744.0 9753.0 9770.0 9792.0 9793.5 9566.5 9575.0 9576.5 9577.0 9579.5 9608.0 9609.0 9613.0 9615.5 9631.0 9633.0 9635.5 9636.5 9637.0 9637.5 9638.0 9638.5 9639.5 9640.5 9684.0 9688.0 9693.5 9697.5 9699.5 9701.5 9702.0 9730.0 9745.0 9757.5 9763.0 9763.5 9764.0 9766.0 9767.0 9770.0 9774.0 9774.5 9775.5 9780.5 9788.5 9789.0 9789.5 9790.5 9791.5 9792.5 9796.5 9800.0 9802.0 9803.5 9805.0 9806.0 9806.5 9808.5 9816.5 $ REMARKS: 9797.5 9801.5 9805.0 9793.0 9800.0 9801.5 9803.0 9803.5 9813.0 PASS 3. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT * FORMAT RECORD / ??MATCH3A. OUT /??MATCH3B.OUT $ : BP EXPLORATION : B - 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 32 Tape File Start Depth = 9839.000000 Tape File End Depth = 9183.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15758 datums Tape Subfile: 4 Minimum reCord length: Maximum record length: 292 records... 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed NeUtron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION : B - 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TypE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 27 Tape File Start Depth = 9839.000000 Tape File End Depth = 9183.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation Code decoding summary: Rep Code: 68 14445 datums Tape Subfile: 5 50 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH.INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9198.0 2418 9198.0 $ LOG HEADER DATA STOP DEPTH 9818.5 9827.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 30-MAY-94 FSYS REV. J001 VER. 1.1 723 30-MAY-94 9833.0 9829.0 9200.0 9828.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323NA .000 10040.0 .0 PRODUCED FLUIDS/SW .00 .0 212.5 0 6900.0 .000 .000 .000 .0 THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION : B - 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 2 CNC 2418 68 1 3 CN 2418 68 1 4 LSN 2418 68 1 5 SSN 2418 68 1 6 CCL 2418 68 1 7 SPD 2418 68 1 8 TTEN 2418 68 1 9 TEN 2418 68 1 GAPI 4 PU-S 4 PU-L 4 CPS 4 CPS 4 4 F/MN 4 LB 4 LB 4 4 19 991 67 4 86 720 65 5 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 105 Tape File Start Depth = 9839.000000 Tape File End Depth = 9183.000000 Tape File LeVel Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 42009 datums Tape Subfile: 6 Minimum record length: Maximum record length: 180 records... 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9198.0 2418 9198.0 $ LOG HEADER DATA STOP DEPTH 9823.5 9832.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY'(PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG):~ NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 30-MAY-94 FSYS REV. J001 VER. 1.1 802 30-MAY-94 9833.0 9829.0 9200.0 9828.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323NA .000 10040.0 .0 PRODUCED FLUIDS/SW .00 .0 212.5 0 6900.0 .000 .000 .000 .0 THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION : B - 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-S 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 104 Tape File Start Depth = 9839.000000 Tape File End Depth = 9191.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 40376 datums Tape Subfile: 7 Minimum record length: Maximum record length: 179 records... 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9198.0 2418 9198.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9822.5 9831.0 30-MAY-94 FSYS REV. J001 VER. 1.1 839 30-MAY-94 9833.0 9829.0 9200.0 9828.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAM~U% RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323NA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .O0O 10040.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS/SW .00 .0 212.5 0 6900.0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR CO~T RATE HIGH SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS) : 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION : B- 20 (14-29-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 104 Tape File Start Depth = 9838.000000 Tape File End Depth = 9190.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 67940 datums Tape Subfile: 8 Minimum record length: Maximum record length: 179 records... 62 bytes 1006 bytes Tape Subfile 9 is type: LIS 94/ 6/14 01 **** REEL TRAILER **** 94/ 6/16 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 16 JUN 94 11:45a Elapsed execution time = 21.31 seconds. SYSTEM RETURN CODE = 0 LIS TAPE ]VP 010.NO~ VERIFICATION LISTING ~AGE I 3RIGIN : ~E~L NA~E :REEL ID ~ONTIN~!ATIOW # :01 PREVIOUS REEL ** TAPE HEADER ** SERVICE NAME :FDIT DATE :83!12/2g ORTGI~ :688~ CONTINUATION # :01 PRE¥IOUS TAPE : COMMENTS :TAP~ COMMENTS ********** EOF ********** FILE N'~E :~DIT .001 PREVIOUS FIL~ : CTRY: USA ***************************************************************************** E,,~,UL = 8'20 :: IMLD = P~UDMOF, BAY OJNT~ ~ NO~TH SLOPE BO:R,3bG~ . : ASING ~ 13,37~" ~St.I~F~CE TD 2678 ~.SING = 9,6~5 : :S[IRFACE:TO: 91:89 ~S~N~ ~ ~,000" 8933 TO 10040 [l :B I ~ (;: =:: 5 ~ 5:00 : 8 tJ R~:F:~-C E:-:T 8996 Y~ FI..UID = ~UD~ OIL TYPE S I ~,F, R ~PP.. COD~ F]NTRY 8 4 73 60 0 ! 66 0 ORDER # LO.,., TYPE CLASS MOD NO bEVEL CODE ;R ZER "SIC ½ACK r8AC 4TDT PSi ~TDT GAP] 0 31 32 CPS 0 0 '-0:0 0 4 CP,S 0 0 0 0 0 4 CPS 0 0 0 0 0 4 CPS 0 0 0 0 · 0 4 1 0 168 0 1 68 0 ! 68 0 1 68 ,VP 010.H02 VEPlFIC~TION LIS?I~IG > 4 'SlG PS2 'R~.T PS2 ~R PS2 ITOT PS2 'T, DT PS2 ~ACK P533 I~DT 'TDT ~RAT P$4 CU 0 40 1 0 CU 0 0 0 0 0 42 1 0 0 GAPI 0 31 32 0 0 CPS 0 0 0 0 0 CPS 0 0 0 O 0 C~S 0 0 o 0 0 CPS 0 0 0 0 0 CU 0 40 1 0 0 CU: 0 0 0 0 0 I 0 0 0 4 0 I 68 0 4 0 1 6.8 4 0 1. 68 4 0 4 0 I : 68 4 0 1 68 4 :0 1 68 4 0 1 68 4 0 I 6~ 4 0 1 68 CU 0 40 CU n 0 CPS 0 0 CPS ' CPS 0 0 CPS 0 0 CU 0 aO ?U 0 0 CPS 0 0 CPS 0 0 CPS 0 0 CPS 0 32 0 0 4- 0 0 0 0 0 4 O 0 0 0 0 4- 0 O 0 0 4 0 0 0 0 4 0 1 0 0 4 0 0 0: 4 0 o 0 4 0 0 : 0 4 0 0 0 0 4 0 0 0 0 4 0 0 0 0 4 0 0 0 0 4 0 1 0 0 4 0 0 0 0 4 0 0 4 0 0 4 0 0 0 0 4 0 0 0 0 4 0 0 0 0 4 0 0 0 0 4 0 )EPT ?RAT tTDT ITDT ~RAT ~TDT :RAT ITDT :~AT ~TDT )EPT ~ITDT ?PAT STD? 9920 I '-' -1084,0000 !5~,2500 2,9707 167.7500 FTDT ~.1797 166.8750 3.9~68 ~95 0000 FTDT 9000.0000 GN 2 7051 GR 225:2500 FTDT 2.~6~4 GR 21R.O000 FTDT 2,90~2 GR -]58.5000 -2682,0000 78,7500 -259,5000 155.6250 608.5000 1.47.0000 220.5000 !56.5000 -141.5000 1.13.3125 150.3750 21.9844 215.5000 37.1562 191.3750 40.0939 $ICg 33.7500 FSI~ BACK 68.5625 FBAC $IG~ 33.1250 FSIG BACK 179.8750 FBAC $IG~ 3i.8437 FSIG BAC~ 196.6~50 FBAC SIG~~ 33.7500 FSIG BACK 227.2500 FBAC SIG~ 32.5000 FSIG ~ACK 233.0000 FBAC ~IG~ 18,6406 FSIC BACK 60,5000 FBAC sIG~ 19,1562 FSIG ~CK 161,2500 PBgC SIG~ 18.1.875 FSIG BACF 177.7500 PBgC -21,343g 40.3756 32.9062 4.7500 1.9375 91.0000 31.5938 ~02.0625 29.0625 96.0625 17.2500 53,8125 16.0313 60.8125 18.328I 159.3750 ,VP 0!O.M02 VERIFICA.~IC~ LISTIN,~ PAGM: ,5 rTOT 2ag.t250 ?~rD? 'RAT 2. 7070 GR ITDT 2,46,2500 F'~DT '~a? 2,~o~ c~,~ ~TDT 197.7500 ~TO~ 263,5000 223,7500 194,2500 1.9.1,562 FSIG 16.7031 205 5000 :i:.BAC ~03.!7500 18 17~9 FS!G 16.5000 206[6250 FiBAC 11:~:62i50 ,O000 ~''~R 1.50 .... 6250 SIG~ 18 8437 FSIG 16 2344 .6387 GR 17.9687 BA:C~ 78.06~;5 PBgC : 28'5469 5000 .FTDT 159,5000 $IG~ 19.2500 FS!G 16.171.9 632~ G~ 28'0938 BACK !6:8'00:0:0 FBAC 61~[0:3'i:3~ 500(1 FTDT 154 37,.0 SIG~ ~9.1875 [SIG .6543 G~ 39i.4063. B.A:~.:K I90-25001 ~'BAC ,1250 WT i ~9~,0000 $IGM ~a,9687 FSIG 16,2031 .6875 ~R 4~5000 !B:~iC!K! i ~98.5000: iFBi'C i 79~'6:875 ~83,8750 $Ia~ 19.07~1 F$IG 53,8750 BA~k 209;5000FOAC )RPT 970~ 'RAT ITDT 'R AT 2 ITDT 279 ~RAT 2 ITDT 289 ~AT 2 ITDT 295 0000 i~. 1.7.2031 1~ S I~., 1 .,8047 GRk !40,2500 $ IC,~' .... 4 :5039 14112:50 BAC!< 99,4375 :F~AC 42~5313 .2500 FTDT 261,0000 SIG~ 17,6372 FSI~ 15 ,3750 WTOT 262.8906 SlG~ 17.2500 FSIG 14.8359 .6172 GR 37, ~1~3 B~C:~ i8:9'5:000 79,2:500 ,o000 FTDT 255 3750 SIGg 17.71,88 FSIG 14.6172 · 5000 GR 46~8I:~5 BACK: 208,00:00 ::F:BAC : : 8.~6875 50O0 WT :50~ 8 ~R 48'6:875 BA:CK . 209,0000 FBAC 91.5000 9 ~ DT 257,0000 $ I (;~'! 17,4688 FSIG 14.664~ .7500 FTDT ~57.7500 .~RAT ~TDT 21 'RAT ~TDT 22 ~RAT ~TD? 22 ~RAT ~TDT 22 ~PAT .ITDT 22 0,0000 cla 147.7617 $.1G~,; 15.0078 F$!G 12,6172 ~ -7773 dR 24,8437 BACK I34'1250 FBAC 71~ 43,75 . ~ ( . 2 .:,0)0 FTr)r 257 2500 SIGI~ 15.3084 FSIG 12;5469 1.8252 :,R 37.8125 BACK 192,0:00:0 FBAC I0 ,3125 7.5000 WTDT 253,7500 SIGm 15.2578 FSIG 1 .7656 ~ .a301 GR 48,9687 BACK 201.i250 FBAC 108,3750 0 a750 F'r.,,~ 262 5000 $l~: 15.2913 PSlG 12.7891 1.8398 GR 54.9375 BACK ~1,3.0000 FBAC 117.6250 9.7500 FTDT 260,2500 STG~ 15.5547 FSIG 12,3984 1.8672 GP 57,2187 BACK. 223,7500 FBAC 118.7500 3. i 250 FTDT 253. I 250 O.O000 GR 175.1250 SIG~ 74.5317 FSIG 21,3906 4.!875 GR 54.4063 BACK 150.7500 FBAC 71.0000 6.S0~0 FTDT 154.6250 SIG~ 22.2969 FSIG 19.7031 3.~I05 GR 57.0000 BACK 199.0000 F~aC 94.0625 7.!250 FTDT 16~.2500 SIG~ 22.5313 FSTG 20.4531 3.00B2 GR 76.t250 BACK 207.0000 F~C 99.1875 0.6250 FTDT 162.1250 SI~ 24.16g0 FSIG 20.7070 3,7949 ~R 92.09~9 BACK 223,6016 FBAC 100.3125 g 9437 FTDT ~v,?500 Sla~ 23.7500 FSIG 19.9570 3:4063 GR 93.8359 BACK 233.9297 FB~C 104.7695 6,fl313 FTDT !90.9375 ~PT Qzt00. 0000 GR 14J .9629 $IG~ ~ 5.7266 F~IG 13.0234 mDT 2 5000 P T 263 0000 TDT 246 ~()23 292 a916 S~ 16 2656 FSIG ! TDT ~95.5000 FTDT 30~).5000 SIG~4 15.6392 FSIG 13'1235 T ..T 227.2383 4 0 62 TDT 280.0625 FTDT 2 ~]PT 9300.0000 GR 219.8750 SIG~ 24.9844 FSIG 22.1406 PAT 2 . 2246 TDT 371 ,2500 FTDT '. u~. ~01.0000 F~DT RAT 2.4375 ..500 33g,o F TDT ~ 000 FSI 3 2500 $I~ 9 FSIG :0.6:25 '::BACK 291 .5000 SlG'~ 22,5625 ~$IG 19.5000 1~:~'1250 ~CK ~35;.0000 ~B~C I0:6 "8:I:25 285,2500 SIG~ 29~..2500 FTDT .,EFT RAT TDT 'RAT T DT 'R~T ~TDT 'RAT 'TDT 'TDT 296699 -~99 3 .z5uO .3g.,6 408 500.) , 7.-1 2,744~ ~o~ ,~5oo .7383 423 0000 .291.9500 $lG},~ '999.2~00 FSI¢ '999.2500 999 ~ 25:00 BICK -999 ~ 2-',,5 O0 ::FB,AC' "999:,2-500 -999,2500 $IGa 27. 0469 ~SIG 23,3438 I29'~750 BACK 2~1,:~3500 ~BAC 109 ~::.0625 25.8750 FSIG 21.2913 5000 103 ~aa.oooo szc~4 26.9219 FSI~ 2 0625 i45 ":6.250 BACK 23:4i2:5-00 FBAC ilO, 282.0000 FILE TRAILER 'ERSION ~ : ~ATE : !AXIf~UN LEtiGTH : 'ILF TYP~ ~EYT FII, F: afA~,~E : .0C~l 1.024 ********** EQF :* TAPE TRAILER ;EPVTCE UA~E )ATE :~3t12/~9 )RICIN :6@~3 ,APE ~A~M : Company LIBRARY TAPE CURVE SPECIFICATIONS SOHIO ALASKA PETROLEUM COMPANY Well B-20 Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 11-23-82 **NOTE** SCALE CHANGE GR1 AT 9180'. Curve Name (Abbrev.) Standard Curve Name LOgs Used ~ Scale , .. , RFOC Resistivity Focused ~DIFL .2 - 2000 RILM Medium RILD " DeeP " " , , GILl Gamma Ray 1 " 20 -.70/0 - 100 SP Spontaneous Potential " 0-100, 100-200 · AC Acoustic BHC/AC 150 - 50 GR2 I Gamma Ray 2 " 0-100, 100-200 SP1 Spontaneous Potential 1 " " " CALl Caliper 1 " 6 - 16 CN Compensated Neutron CD/CN 60 - 0 DENP Density Porosity " " DEN Density CDL 2 - 3 CORR Correction " -.5 - .5 GR Gamma Ray CDL-CD/CN 0-100, 100-200 CAL Caliper " 6 - 16 ,,_ i .... -- ........... ~.~: C~_. - ..... SOHIO ALASKA PETROLEUF1 CO.PANY F~..~ ,: --- LEVEL SPACING 0,2500 SOHIO ALASKA PETROLEUM COMPANY D,S. B-20 RUN WZTH DZFL AND GR2 IS RUN WzTR'"'""B'~'C/AC;' FT. AP1 APl API RV RV IN IN ~ % G/C .................. 83.29, O, 71, O. O. Oo O° O. O. 0.0 0.0 0.0 0.0 0°0 0.0 0.0 ~`~`~i~`~`;~`~;;~`;~i~;2~`~2~`~;~2~`~;~;~`!!~:~ iii'i0; ii';~i~i','0 ........ 0":0 0 83.39, O. 66, O, O. O, O, O. O. 0,0 0.0 0.0 0,0 0.0 0,0 0.0 81~9, O, 58. O. O, O° O. O. O. 0,0 0.0 0.0 0.0 0.0 0°0 0.0 8159. O. 89. O. O. O. O. O. O. 0.0 0.0 0.0 0.0 0.0 ~3.69, O. 77. O, O, O. O. o. O. 0,0 0.0 0,0 0,0 0.0 0.0 o.o o.o o.o o.o o.o o.o 83.79, 0,3.07, O, O, O, O. O. O. 0.0 0.0 0.0 0.0 0.0 0.0 0,0 '-'~"i'~'~'; ............... '0"'2'" "9-~ i :'" '"' -0'2 ............ "021 ............ d:2'~""i~:b','''' .............. ~'~ ................ 0'~2 .............. 0~'0 0'. o 0. o o. o 0. o o, 0 o. o ................................................................................................................. ............... : ........................ :..: .,: .................. .~ ......................................... 83.89. O, 99, O. O. O. O. O. O. 0,0 0.0 0,0 0.0 0.0 0.0 0.0 d'Ig~':;"""- ........ d",i'$"9"2"' ........... O'; ...... ~"O;'-'-'"i:'"-O'2''''''::'-' 0~';'''' ....................... d"2 ...... ~', ............. 0";d ...... 0'2'0 ..... 02 o o'.'o 0.o o, o o. o ~'i"9'"~'"2 ................ o'"';ii'i"; ................ 0'-'; ..................... 0; O'; ........ 0"'; ......................... 0'"2 .................. 02' 0,'0 02 o o. o o. o o. o o, o o. o -~'~"2~0:~':7:"T'""0 ;"ii'i ;':'" :~"~';;';"i'-¥0i:;'~':~T'~ ;::"-::'; "'0";'"---¥"'i:b;: ............ "0; .............. 0;0 0'20 ...... o' ~--'"'"'~'~"~";'--':'-'--'-'~';i'"~~ " ~;~i!~i. :":0;:o o' o '0. o 0'.o o"0- ~"~'-~"~'; .................. o";'i'"~' ~iiio~2O?iiii:";.~i;~.:dT';~.i'ib. o O.o' o', o 'o,0 :'""'"-~'~; ................ o~;'i'i'~ ~,i~i ?~"::'~:~.~.~:0:-: '~"2'5"~; ............... o';'i"sg'; ............... o"; ......................... ; ............... o"; .............. 'o"'; .......................... o'; ...................... b; ............. 0', o '0 ;'o o-o O. o o' o o ~"~"~"~";; ................ o'"; ..... '~"; .......... o"; .............. o-; ........ ----o-';- .............. o";' o2 ....................... o"; 0","o ........ o20 o,'o O. o o, o O. 0 O, 0 ..... 0",b ............... 0'2'o ......... o";'00"0 .... 0,o 6; 0 0';-~ o.o o.o o.o o.o o.o o.o o.o '~"~"~"~::; ............... b~";i"~"~';-"-'"'"'~'~"O':;'~"~'"'~""~0:';:'¥:"-'d:;¥:' '-b'";'''~'''~ .............. d'; ........... ~ ......... b'2 ................ 0';0 .......... 02'0 ....... 0',o o. o o.'0 ~'~'"9'"; ................ 0'";"i"~"~'; ................... '0"-; .................. 0"; ............. O'; ....... 0'"; ........... ................. 0"; ......................... 0"; .................. 0';"0 0"20 0,o o.o o', o' 0,1~, 0., O. O, O. O. O. 0,0 0.0 0.0 0,0 0.0 0.0 0.0 ............ 0";'i'~"8"; ................... 0"-; .................. 0'"; ................. 0"'; ............... 0'; ...................... '0'; ................ 0'; ......... 0;'0 020 0,o 0,o 0.o 0,'0 02'0 '"'"'0"';'i'~i-;~'~' ........... 0';"'"~-~-'O";:' .......... ~-0";-'::'~""'0~; .............. ~'~'"0'7 ............... '0"; ............... '0";'b .......... 0'2'0 .......... 0';'0 ...... 0;"o 0"0 0';'0 ....... 0"','6 ................ 0'";'i"~"8"; ................... 0'"; ................. 0'"; .................. 0'; ................... 0'; ....................... '~"; ....................... o, o,o o.o o,o o,o o,o o,o o,o ................ 'o";!ii'ii'.-"~'~'"i'.' o';iii'ii.i ....... o" 'o';'o" 'b,'o" '.' 'o',o'" 0,119, O, O. O, O. O. O. 0.0 0.0 0.0 0,0 0.0 0.0 0.0 .............. 'o"";'"i'~"~"; .................. o'"; ................. o'"; .................. o'; .................... o"; ............................ '~"'; ........................ o'"; o';'o o,o o'o o'o O,o o.o ............... o':"o ........ o";'o o, o" i'.0,'o'"" 0,3.11, O, O, O, O. 13. O, 0,0 0.0 0,0 0,0 0,0 0.0 0,0 0,111, O, O, O, O, O, O, 0,0 0.0 0,0 0,0 0,0 0,0 0,0 0'";i~";' ................ 0'; ................. 0';"'"'"'~"-b';~"-"-'"'"b";: .................... 'b-; ................. '~";'o. o o. o o. o o. o o. o o. o o. o 0.121. o. 0. o. o. o. ....... 0.. ............ 0.,..0 0..0 o.o o.o 0....o .... o..0 PAGE 2 SOHIO ALASKA PETROLEUM COMPANY D.S. B-20 GR1 IS RUN WITH DIFL AND. GR2 IS RUN WYTH BHC/AC, FT, AP1 API AP1 MV MV IN IN o. o o. o 0'0 0',".0' 0.0 0.0.. 0.,.0 0o0 0,0 0~.0 0.0 0,0 0.,..0 ...... 0._0 .... 0.0 0.0 0.0 .... 0,0 0,0 0,0 ~.,.0 0.0 0,0 0,0 ..0'0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0,0..0~0 ~.0 0,0 0.0 0.0 0.0 P, 579o Oo 6,1. Oo O. Oo O. O. O. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ............................................... ~'S"~'~ :;''~': ......... O':;""'""~¥;¥-r"'::'O;T'~-i'"-O'; '-"':'--"'O ?'~-::0"';"~'i 'i:""":'"'b';'-'~-'''-'' ': ':0-; ........ b";-O~ .............. 0'2 0 ........... O; 0 ...... 0;0 .......... 0;-0 ........ O-;b ........... O-2i)~ .... . "'"'~'~'i"~, ............ o; ........ 66"; .............. o'; .................. o'; ................... 0'; .................. 0'; .......................... b'"; 0'"'~ ..... o.o o.o o.o o.o o.o o.o o.o PAGE SOHIO ALASKA PETROLEUM COMPANY D,S. B-20 CN DENP 8629, O, 66, O, O, O, O, O. O. 0,0 0.0 0,0. 0,0 0,0 0.0 ........................ A4~3:~",'-'":""0:;'"--~"~; .......... ~b:; ........ :""~:'::':'~6; .............. 'b;"'-"' ......... "'0" i~i..ii 0" ................ 0';0 o.o o.o o.o o.o o...o o.o 8639,. O, 70, O, O, O, O, O. O. ................. ~...~..~O. 0~0 ...... o,.o 0,.0 0,0 ..0..-0 ..... O...,.g ............................... A'~'g':4 ;-":'"":b; ...... ~"~"; ..... 86/'1'9, 0 · 55, 0, 0, 0 :'::A~-~'~';;'"'"':'" :0'~';'""'"" ~i;'"" '~ ::~;?!":'0~; ~6§9, O- 56, O, O, O, O, O, O. 0,0 0.0 0,0 . 0,0 ..0..0 86e9, O, 65, O, O, O, O, 0.. O, 0,0 0.0 0,0 0,0 O.,..O 0,0 : ~`~`.~`~::;`~`:`~:~;~``:`~;~`~``~b~;`:`~:`~`~:~.~::~:~``~-b~;:`:`~`:Y-d:'';' ....... ::'"':""~;":': ........ 0, .............. 0"2'0 0", o O, o o. o o. o o. o o. o 8679. O* 61. O. O. O, O, O. O, 0,0 0.0 0,0 0,0 0.0 0,0 8689, O, 65, O. O, O, O, Oo O. 0,0 0.0 0,0 0,.0 :"'"'-"~"~" ';""?'"':~0:"2::'""~'?;'~'''-:'''':'0:.2:'I-'':-'~0''~:'::-: F~::':;~;~-'"':'"':":'":~':2 ........... -:~"; ........ ~O";d ............. Oio ........ 0';'0o. o o. o o,.0 o..0 :. .................................................... :...,... ................................................... ....................................................... ................... : ............................. 8699, O, 6LI., O, O. O, O, O. O. 0,0 0.0 0,0 0,0 O.O 0,0 0,0 '"~-';"0 .................. O'":b ......... 0';'0 ....... 0"2"0 ..... 0 ;'0 ........ 62'~ .......... ~'2b- ...... 8729, O, ~739, ......... 0.,.0 ....... 0,0 ..... 0.,..0 ......... 0.~..0 ........ 0.._0 0.0 0.0 0,0 .0..,.o ..... O...,q ........... O.~._P 0,0 0.0 0.0 ...... o,o 0...-0 ........ 0~.0 o,o o,o o,o 0.,..0 o.o o.o 0.0 0,.0 '0 0,0 0,0 0.0 0.0 ~809, O. 70. O, O, O, O, O. O. 0,0 0.0 0,0 0.0 0.0 0.0 0.0 ~839, O, 68, O. O, O, O, O, O. 0,0 0.0 0,0 0,0 0,0 0,0 0.0 :';i ,: ii: ' : ....... o";'"o' ........... o';o ............ o';'o' 'ii" O,o'' 0';io" ii0','.:;i. 88~+9. 0 · 60. 0. 0. 0. 0, O. 0. 0 · 0 0.0 0.0 0.0 0.,0 0..~ .0 ...... o.o o.o o.o o.o o o.o ~859. o. 57. o. o. o. o. o. o. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ................................. ~'~'~'~'; .......... ~';'":-"~'~; .......... "'0; ............ '0:';"'-':~0;-:--~; ................. '"':-d';-" .............. ~"; ....... 0,'0 ....... 0"2"0 O, 0 .... 0,0 O. 0 o. 0 o. 0 : 8869, O, 61, O, O, O, O, O. O. 0,0 0.0 0.0 0,0 0,0 0,0 0..,.0...i PAGE SOHIO ALASKA PETROLEUM COHPANY D,S. B-20 GR1 IS RUN WITH DIFL AND GR2 IS RUN WTTH BHC/AC, FT. API API API MV NV IN IN RILD CN DENP DEN CORR G/C .............. 8879, O. 60, O, O, O, O, O, O, 0,0 0.0 0,0 0.0 0.0 !.':.: ......... _.2:... .... ::......i'..,:... .......... 0..- ........... O.,. ...................... 0,, ......................... 0..., ................. O... 0 0.0 0.0 0.0 o. o A~889 · O. 66, O. O, O. O. O. O. 0,0 0.0 0.0 0.0 0.0 ............... 0"';0".i ii."'0'.~'o o, o o. o o. o o.o o,0 0,0 0.0 0,0 0~0., 8899, O, 67- O, O. O, O. O. O. 0,0 0.0 0,0 0.0 0,0 0.0 01~'~0 ..... 0,'0 0'.° 0',0 0',0 ......... 0'2o 8909. O, 61. O. O. O. O. O. O. 0,0 0.0 0.0. 0.0 0,0 0,0 ~.0,.0 8919, O. 70. O, O, O. O, O. O. 0,0 0.0 0,0 0,0 ..0.0 O~..O :""~9'-2~:2-?b2 ..... ~i'~"~ .......... ~bi-~':-O'~'"~i"i:'--'O~'-? b-i .............. :'d'"; ................. 0'-2 ........... 0'2"0 ....... 0'20 ...... o, o o. o o o o. o o. o 8929. O. 71. O, O, O. O. O. O. 0.0 0,0 0.0 0.0 0.0 8959. O, 70. Oo O. O. O. O. O. 0,0 0.0 0,0 0,0 0.0 0,0 0.0 89~9, O, 63, O. O, O, O. O, O. 0,0 0.0 0,0 0,0 O,O 0,0 0.0 0,0 0...0 o....0 0-...0 .... 0....0 7' 0 O, O. O. O. 8979, O, 68 O, O. O. O, O. O. 0,0 0.0 o.o o.o o.o o.o o.o o o.o o.o o.o o.o o 0'o 0'o 0",'0 ..... o 0','0 0"'0 0';-'0 .......... O"'2b- 'o - o..o ..o.'.0 ,0 0.0 0o0 0.0 ...0.0 ..... 0..-_.0q.~..O ........... .0...,..~. 0,0 0,0 0,0 0.0 0 0.,0 .......... 0.?.0 ........... 0...,...0 ............ 0....,...0 0 0,0 0,0 0,0 0.0 0,0 0,0 0.0 0.0 0.0 ~ 9. O. 7 9009, O, 77. ................. o";"0'i" ...... ;.'o_';io' o.'o 9039, O, 6~. O, O, O, O, 0, O. 0,0 0.0 0,0 0.0 0.0 0,0 0.0 ~'0"~'~"2 .................. '0""2 ...... '~"?"2 ................ 0'2 ................... 0'2 ............... 0"'2 .................. 0"'2 ........................... 02 ............................ 0"; ..................... 0',0 o'20 o.o o.o o.o o.o o.o ......................................................................... ... .............................. i .................................................................. ; ' 9059. O. 69. O. O. O. O. O. O. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ~'0~"~'"; ............ 0'"; ~'2'"; ............... 0'; ................ 0"; ............... 0'"; ................ 0'"; .................. 0'"; ................... 0. ........ o.o o.o o.o o.o o.o o.o o.o 9079, O, 68, O, O, O, O, O. O. 0,0 0.0 0,0 0,0 0,0 0,0 0.0 ........................................... 9'0'~:~'; ................. 0"";"'"'7'i'-; ............... O";-"-O";-":""b-';--'"':~''0''2 ........... "";'d'"i ................. 02 .................... b"2 0 ....... 0'2-0 ..... o- 9o8"~'; o'"', ...... ~'o'"; ................ o'"; ................ o'"; ................... 0'; ................. 0'; .......................... 0", o. o.o o.o o.o o.o o.o o.o o.o 9099. O, 69. O, O. O, O. O, O. 0,0 0.0 0,0 0.0158,5 0,0 0.0 ~"~'0'~'"; ...... g~;"V'"'?3";'""."~8'";'iiO':;iid'~; ......... '9~; ............... :~";": .......... '0"~ ............. O'",'~O00'O"iO~', 7' ~', ~ ' ~ 9. '~ 1' ,9 ~'1",'2' .................. ~'iO"~'; ....... 7'2"; ........ ?'~"', ........ ?'2'";"ii"i-;"i'i"i"; .................. ~";' ................ §'"; 0'~ ..... o, ~o o o o, o · 9"ii~"; ?"0'"; '?0'", ........ ?O;i'O'i'"';"i'Oi; .......... ~"; ................ ~'"; ............. O' 0,~o0'oo, o PAGE 5 SOHTO ALASKA PETROLEUM COMPANY .D.,.S.... ....... ........ ~"~'-""A'O'N'""'"'B-iTH D ! F L A N D G R 2 I S R UN W ! TH B H C / A C .~ O'~P"~ ........... "-~'A:':' Gini -~'Ai'~' .... ':'i-~"'"'~:~.i':' :~A[:':~"~-[ i"'-:"' '-"A'~ ..... A'F"O'~ ..... R'i[M R'I LD CN DE'Np .... DEN "C'ORR ...................................................................... f. .................... .~ ............................................................... :: ............ z ................................ " ....... FT, API API API MV MV IN IN ~ % ..... 6,!C :;..;.:~i'~'~'...;';;?~:;':;.'?~'~,~.:~ ?~:gi.'O'~!'.o::~;;.:;.;~ ~:,;. :;.;";;~:..~".;':';.;;;;.~"'-'~;_;:' .............. o",'~ooo'o",o ~. ~ ~s,'~,.~" 9~29. 75. 79, 75.105,105. 9. 9. O. 0,~0000,0 ..... ~9. ~9. ~. ~9.~o~.~o~. 9. ~. o. o..~oooo.o ~.~ ~.~ s~.~ ~.~-~.~ ;';.,,':"::,:'-~:i:~:~"'F;::~/O~;'::'"'v.~:'~';;~;~'~::;;~.:d' ~;F;::?~:'~';;"'::'::'~-~:";.;:;;:'~',~;-;','/~-.'' ~':~;:.'~'.0;0'0.'6,;'0,-:;,, '.; 91~9, 59, 65, 59, 92, 92, 9, 9, O. 0,-~0000.~.0 ........ 6~,.! 35.-.!.., T6~,7 ....... 9159. 58. 57. 58.109,109, 9. 9. O. 0.~0000.0 ...... ~.77,...3S,~..~6,.,.2 ~...,.9..~,,~.!..~2, ...... 9169, 67, 66, 67, 99, 99, 9. 9, 1~, 0,~0000.0 ~,7 30,7 51.7 9179, 66, 69, 66, 89. 89, 9, 9. 7~. 0,~0000.0 ~,~ 30,6 58,,.,8 ........ 9189, 58. 58, 58, 97. 97, 9- 9, 923. 0,30000.0 ~2,8 3~,5 ~.6 1,9 -~.~ :"'~:;;.;;~i;;~;': :?~;:';~'~: ;;';;:'";~:~:;;::':i~'~:;;~;;, """0';'~"~"~'"'~:~'~'i'''''~ ...... 9199. 97. 97. 97.122,122. 1~. 1~. I1~. 1.8 .................. ~.,,,..6 ................ !.~...g,,,,.~,!..,.0._....2,9,,~,! ........... 1,7 1.5 ~6,0 19.7 2.,.~ ...... 0.,.2 .... 9209,110.11 22.122. 1~. 1 9229,199,220 9239. 60. 38,3 18,0 2.~ 0,2 ~,'? ~S."O ~';~ ......... 0":'~ ..... 8.2 27.5 2.2 0.0 ......... 8.26.7 2,3 ...... 0.,.o I8.1 25.2 2.3 0.0 · 2 23.9 2.3 0.0 9309,275-2G0.~75. ~7. ~7. 9. 9, G~. 79,0 55.q 60.1 7.2 -0,2 2.7 0,2 .................................... {-~'i'~? :'9:~';"'"' :"~"i"';"'::"~:~'"::'"~'~:;::'"'~-~"';'"'": :';:!'""~";':'""" ........ :'"~';'::' ....... 5"~";'""'"~'~'";'-~ ............ ~'2"i'9 ......... 8'9','9 ....... §;'2 ....... f;'8 .... ............................. ~'S"i"~'";' ............ g"9'"; ........... g"~"'; ......... g'~'; ............ ~"~'"; ............ ~"~"; .................. ~'"; ............................ g;' 5'~';"g'5'"0'~. 8 167.7 92.9 3. i ~,. ~ 2. ~, o. 0 9329.111.10~.111. 80. 80. 9. 9. 70. 129,9 32.6 2~.5 10.7 8.~ 2.6 0.0 ~:3 3'~";"~'i"8:';"i'-:i:~"~'-i:'1:'~ ;-'""'-"'~'~":;:"::'"~:~'~'""'F':::~:;-:-' ":'-"'-'"~-~'"~-"""""'"'"'~i; ................ i'8";'g: ........ i'"~'-,"-~ ....... ~"~ i 3'"'i' i 0'*'~ .... ~ ','§ ......... 0';' 0 ..... ................... ~'"3'39'"i'g~";"i'9~";"i"g~'-; ............ ?"5'"; ............. ?'~'"; .................. '~"; ............................ §'"; ................ ~g"; ............ i'2";0' f'i'5 7.9 21.8 l~+. ~ 2.5 0.0 .................................... ~3`~`.~``.;.``.:`.~$`.`;`.`.~.`.~:$~.`;`.``:...~:~`g~.``..~:~V``~`~:~:J:..`;...~.`;``...`.:.`.`.:?.;.``~.`;.``..``:~..`~.6`.''' .................. ~";'g O','g ...... 0"~," i~. 6 ~. 3 2. ~, o. 0 '"~3'~'~"; ......... s"g'"; ........ ~"?'"'; ......... ~'g'"'; .......... ~-~";'-"'~"~'"; ............ ~"; ................... ~";' ......... i'~'i";' ........... ~'~';33'~'; 9 2~ ;9 1~+- o 3a. ~ '2'".'1 ,o. o ....................................................... §-SSi~':;' "i~'~:;'""'":~:~:~"-"'"~"~:;'-"--'~:'~;;' :;"'-~-~"~;"" :::"-:§':: .......... :"-'""~":': ........... ~'~': ............. ~S '"~ ~'i ':"7 ..... ~ 2';'~''' i 2'""9'" e 7"'1 .... 9'3"S~'"'; ......... ~'"5"; ......... a~"; ......... ~"S:*' ........... ~"0', 3'"0"'; .................... ~"; ........................ ~"; .......... i'"O'"i'"'~ ...... '1 ~,~. 1 ~+9. ~, 1 ~. 1 2 9.7 2. e - o. 0 ~-~'~"~"~' ...... ~"2'"'~ ........ ~:'~; .... ~"'~ ......... ~-'0:'~ :"~:~'"~' ..... ':':'"'~"~' .............. ':"~'~'": "'i-O"~, .............. 8'g'"';~ '9'3":9 ..... 62', i'i i"7" 3-'3 ,'8 ........ 2"~ i ..... 0'"'~0- ................................... ~'S'gg'"; ........ ~'g"; ........ ~"6";' ....... ~'g"; ............. ~"i'"'; ........ §'i'"; ................. ~'"; ...................... ~"; ................ ~'~'"~ S'~"~ 3~'.~ 35. ~ 15.3 2~..~ 2.. ~ O. 0 PA~E SOHIO ALASKA PETROLEUM COMPANY D,S.'B-20 ! ........................................ : ............................................ T,....,.,~ ................... ; ................. ! _ .......................... ~ ,. ~..~......z..~..~. ~.o~.~ ....~-~.~ ~......~..~..~-[....~ ~.~ ...-..-.~.~.~....~-~-.~-~-.-~-~.~ ~.~-~-.-~-~ ~. BH~,/'A c. FTo API API API HV ~V IN IN ~ % .G./C 9379. 2~, 25. 2q, 29. 29. 9. 9. 99. 74.~ 86,1 61,5 I~.1 31.0 2.2 -0,0 9389. ~5o 38. ~5. 63o 65, 9. 9. 85. ~3o9 ~0.3 30.5 13.5 25,~ 2.3 ?.~..,.0 ...... .................................................................................................................................. ; ........................... - ...... 9399, ~0, 32. ~0, 40, 40, 9, 9. 90. 5~,7 70...,.0 ...5.3~5 ..... !3.,_0 26,.,.5 ........ 2.,.~_?0.....0 9409. 25. 25, 25. 32. 32, 9. 9. 92. 6g.6 62,7 .... 2,.,3 .......................................................................................................................................... ; ............................................................................... ' · 9419. 22. 23. 22. 22. 22. 9. 9. 99. 70,8 68,9 68.6 1~.2 29.8 2.2 9~29, 27, 27. 27, 28. 28. 9, 9, 95. 68,2 62,7 61,9 i5,5 28,7 2,2 9~39. 33° 39. 33. 19o 19. 9. 9. 100. 577~ .......... 3,9.,,.3 50~.~ .... !.?~.1._26..5. 2~..3 ...... ................................................... ~ ............................................ ; .................. ~ . 83°1 93.4 99,5 17o0 2~,~0 2,.3 94~. 27. 27. 27. z2. 12. e. ~. e~. ..................... e;O i'~ ...... ;a ......... ~;~'"'";"6;6 ..... .............. ~ .............. . ..... .......... ..{8 102,0 15,g 27,9 2°2 -0.0 9~6 "~ 80'3:!!17"'1 29'~ 2*2 5~,~ z~,, ~o,2 ~', 'o.0 7 15.2 28.8 2.2 -0.0 ............... ~ ....... 9~89. 26. 7.8.,2.~.~ 2,3 9.0 23.9 2.3 0.1 9~99, 6' 17..2....!~72 .....2,,..~ ..... 218.8 26.2 2,3 0.1 9509. 20, 20. 20. 2;. 22° 9. 9. 99. 72.9"'~"0'0-,2. .... 7!.?...3,....2,0,_e,.6,_,2.?,,8 2~,2 .............. 0.?.,0 ...................... : ............. ~5'~';'--':$;O;~7~;T'T$~O:;~!::~ ?5;i:;~?~:~:'~i~:"~2Y~:~"g~i;~ ........... ~'~-2'0 ........... ~'~"2'~ 23,2 19,3 17,6 2,~ 0,0 ................................... §'5'i~"; ............. ~'~"; ........ 51, "~-~'"; ..... ~?';'-~'?'"; ..... ~; {; ~; ...... ~'~';'? ......... 3~';2 30'3i3"~'1§,6' 2',~ ................................ . 9! 31, 3~, ~1. 3; ;2, 9, 9. 88, 76.2 76 2 58,8 1~,8 2~.9 2.3 0.! .......................... ~5'3'~'7--'~':;'~i Y:2~;:~::~?'~:~'~;i:"-!-':-~-;'~T~TT~ ..... 9~'; ........ :~""'~";;'~ ......... 8~";"~ 5'5,6 15,3 27.7 2,2 0...,! 25. 23, 25, 2; · 21, g, 9. 75. 75.~ 77.5 80.0 9.5 21.2 2.3 0.0 PAGE 7 ' SOHIO ALASKA PETROLEUM COMPANY D,S. B-20 IS RUN WITH DIFL AND GR2 IS RUN WTTH BHC/AC. iii'ii, ii.'i!.i.i'i"i'_'ii'i'.'ii.'-ii!.'.i 'i'i.O~R?~i! 'i.'!i.i.!'~.'!~,ii.:i i.!i~i~-~!!i~i~i~ ~i~i!~'~!L:!.~i'~..~i.. i-_i....i.iiiiii_...~!~i ...... 'i Ri~'~Ci.'i'iill ii RiL M ...... R!L.D CN...BE.NP ....... D.~N...._C.gR.R ........ FT'. APl API AP1 MV MV IN IN % .~ G./.C 9629. 2~+. 23. 2~+. 25, 25, 9. 9. 76. 62,5 68.5 60.7 10.9 22.0 2,.3.. ........... O....O.. 9639. 20. 21. 20. 26. 26. 9, 9. 86. 42.3 52.0 ~+7.8 16.4 25.G 2.3 -0.0 96~9, 2~, 23, 2~, 26, 26, 9, 9. 89. 52,1 29.~ 29,3 17,8 26,0 ..... 2,3 ......... 0..,0 .... 9669, 22' 22, 22, 26, 26, 9, 9, 95. 23,0 22.0 22,5 18,9. 29-5 .... 2.'.,..2...~0..,0 9679. 29. 27. 29, 34. 3q. 9. 9. lO0. 2~+.5 36.0 27.3 20.1 26.3 2.3 0..0 .................................. : ................ : ................. .......~. ....................... :... ;:..z.~ ............... .:z,......{ ............... ~ ............ ;.z....~.. .............. .~..~,......&...J: ................ 2,;......~..., ................................ ~:; .............................. :--= ................................... ; I 9689, 25. 2~. 25. 32. 32. ~. 9. ZOO. ~8.Z ~.6 ZT.2 18.8 28.5 2.2 0,0__ 9 09, 20. 9 ~, 42, 9729. 27, 9739 25, O, 9, 9. 9759,110,123.110, 9 · 93, 9, 5, ~6. 46, 9. 9. 98. 9, 74. 18,4 24+.7 2,3 -0.0 18,9 29.2 2,2 -0.0 'S-;'"~' ......... i"3'";-~ 1~, 8 18.6 ~8' 1 .... ~, 2 ......... 0" 0" 8 21.2 18.4 27.6 2.2 -0.0 18,1 26.0 2,3 -0.0 ,3 25,1 2,3 0.1 · 0 26.8 2,3 0.0 7'1 21.1 29.8 2.2 0.0 ;2.0,6 27..7 2.2 0,0 9,9 28.2 2,2 ,0.0 ;9,9 28,2 2,2 -0,0 ,6 29,7 2.2 -0.0 · 5 27.3 2.2 0.0 6.4 7.~ 6.6 23.~ 10.6 2.5 0.2 .... '~";'-'0- .............. i'~";'~ ............... ~'-,-'3' i'~;"~ ......... f',f .......... ~"~-~ ............. 0"2i ..... 16.,'-~ 2'i-,4 1~,8 17.9 22.8 2.3 -0.0 9789, 20, 20, 20, 30, 30, 9, 9. 96. 14,2 12.0 9,6 18,~ 26,7 2,3 -0.0 9809, 38, 38, 38. 59, 59, 9, 9, 89. 15,3 10.1 8.8 19.1 lq-.2 2.5 0.0 ................ ..................... -";'i ........ ................ .... 9819, 63, 84, 63. 91. 91, 9, 9. 91. 5.8 13.9 9.6 17.0 17.0 2.q 0.1 9829, 21, 20, 21, 32, 32, 9, 9, 84. 13,1 13.8 12.5 21,6 26.7 2,3 0.1 ~'B'~'9'-; ..... '2'0'-, ......... 22"; .......... ~"0--;' ........ ~'~'"; ........... ~2"~-"; .................... 9'; .......................... '~'";' .................. 9'5-; .............. 2'5.6 lo. 7 8.0 i 8.0 28.7 2.2 "0"-0 98~9, 26, 26, 26, 19. 19, 9, 9. 95. 27,9 lo.e.2 ......... ........ 2..,....2 .......... 0..,_.0 .... 9859, 2q. ~0. 2~, 56. 56, 9. 9, 89. 16.~ 13.6 9,6 17,~ 21.1 2,3 0.0 '~"~"g'~'"; ......... '~'5'", ........... ~'~"'; ......... 2'5'"; ........ g'~'"; ........... '3'g';' .................. ~'"'; ......................... ~'"~ ........... S'g. i9',2 a'i 2 6. ~ 2o. ~ 2~. 9 2. ~ o. o SOH[O ALASKA PETROLEUM COMPANY D,S. B-20 GR1 IS RUN WITH DIFL AND GR2 IS RUN WYTH BHC/AC, FT, API API API ~IV MV IN IN % % G./.C. 9879. 26, 25. 26, 3~, 3~+, 9. 9, 90, 13,2 ~.5 3,q 21,0 25,2 2.3 0,1 ..... 9889. 27, 29, 27, ~5, ~5, 9, 9. 89. 6,8 3.~ 2,7 18,5 23.5 2,3 -0.0 9899. $0, 28, 30, 47° 47° 9. 9. 87. 11,2 3.5 9909,136.126.156,113,113, 9. 9. 71. 7,5 a.3 i 9",o g919, ~, ~1. ~, qg, ~9, 9. 9. 8~, 11,0 5.6 ......... '"9', ............. 8'8. 8,2 3.3 2,8 17,1 20.1 5,3 2~,6 9,6 2,5 0.3 6,7 23,~ !5,2 2.,5... 6,8 16,3 20,7 2,~ 0.0 ~,2 15,6 16,7 2,7 20,6 12,2 2,5 0.1 9929, 62, 52, 62, 66, 66, 9, 9, '8~, 9,8 ~.2 3,6 16,3 25.2 2.3 0..,0 ............. ~"9-~'~;-"~"3'~';-'""~'~'¥;'T3~'d'T'"~'5!;":i'"~;<i: -"~';'?": '"'"'~'~ ............ 8"d-~ .................. ~;'~ ~'23' ~, 1 17.5 25.3 2.3 o. o ........................................... ~'9~'~';';"i"~':~;-'"'"'?"~"'i ..... i'"'"'"'~0:;"i:'7~:~;;'~:'''''':': .......... :T':"~; ........ ~'~"; ................ 8';"~ ~'"'8 3' 7 i 6,522 '6 ................. l ................................................. : .................................. L,...:,..,.,.,,,,;..:.:_ :, .................... ,, ....................... ;,..,.,; ................. : ........................................ ..... ' . 99~9, 55. 56, 55. 58, 58, 9, 9. 82. 9,7 5.0 ~,0 16,6 21,5 2,3 0.0