Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-097
STATE OF ALASKA 0 16 IN A IL ALASKA (OIL AND GAS CONSERVATION COMMISSION WI ! I COMP! ETLON OR RI=COMP LETION REPORT AND LOG 1. Status of Well Classificalion of Service Well OIL [] GAS [] SUSPEi',,DED [] ABAN~ED I~ SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-97 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21132 4. Location of well at surface 9. Unit or Lease Name 97' NSL, 846' EWL, SEC. 11, TION, R15E, UM "LC~~ Prudhoe Bay Unit At Top Producing Interval-~V~TM, 10. Well Number 2458' SNL, 20' WEL, SEC. 15, TION, R15E, UM ~,~_ ~ DS 3-34 I 11. Field and Pool At Total Depth~.t~ .~ ! Prudhoe Bay Field/Prudhoe Bay Pool 2570' SNL, 96' WEL, SEC. 15, TION, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 62' I ADL 28332 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. o~ Aband. 115. Water Depth, if offshore 116. No. of Completions 7/13/84 7/25/84 2/27/92I N/A feet USE I Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey ~20. Depth where SSSV set Fl. Thickness of Permafrost 9860'MD/9231'TVD 9077'MD/8481'TVD YES [] NO []! 2208'feet MD ! 1900' (Approx.) 22. Type Electric or Other Logs Run N/A 23. CASING, LINER AND CEMENTING FIE-C, Ot:~ SETI'ING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SiZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 11 O' 30" 1865# Poleset 13-3/8" 72# L-80 Surface 2501' 28-1/2" 2100 sx CS 11/200 sx CS II 9-5/8" 47# L-80 Surface 9324' 12-1/4" 500 sx Class "G"/300 sx CS 7" 29# L-80 9098' 9860' 8-1/2" 300 sx Class "G" ;)4. Perforations open to Production (MD+TVD of Top and Bottom and ;)5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD} N/A None 26. ACID, FRACTURE, CEMENT,SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9077'-9579' 168 cu fl Class G" 8290' Bridge Plug 27. PRODUCTI°N TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) N/A I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF iNATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED AU G 1 0 199 Alaska 0il & Gas Cons. commisSiOn Anchorage · .. Form 10-407 Rev. 7-1-80 ~INUED ON REVERSE SIDE Submit in duplicate .~9. 30. GEOL~ MARKERS F~O, MATION TESTS NAME Include interval tested, pressure data, all tluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 9422' 8815' HOT 9670' 9053' OWC 9715' 9096' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~J(,o ~~.,!. TitleDrillingEn~_ineerSuoervisor Date<;~'''~''''~' ~'' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. R E¢ E IV E D Item 28: If no cores taken, indicate "none". Form 10-407 AU G 10 199 Alaska Oil & Gas Cons. CommiSsion ~ch0rage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 3-34A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50-029-21132 PERMIT: APPROVAL: ACCEPT: 04/01/92 02:04 SPUD: 04/07/92 12:04 RELEASE: 04/15/92 02:04 OPERATION: DRLG RIG: NABORS 2ES WO/C RIG: NABORS 2ES 04/02/92 (1) TD: 0 PB: 9823 PULLING EXISTING 5-1/2 CMPLTN MW: 9.8 ACCEPT RIG AT 1400 HRS. 4/2/92. ATTEMPT TO PULL BPV. CIRC. NU BOPS & TEST. WBM 04/03/92 (2) TD: 0 PB: 8290 RUNNING VERTILOG CASING INSPEG MW: 0.0 FINISHED PULLING 5-1/2 COMPLETION. SET BRIDGE PLUG AT 8290'. POH. PREPARED TO RIH & LOG. WBM 04/04/92 ( 3) TD: 0 PB: 8290 MILLING SECTION IN 8-5/8 SECTN MW: 9.8 INSPECTED 9-5/8 CASING FROM 8285 TO SURFACE. GOOD CONDITION OVERALL. RIH W/BHA #1. CUT FROM 8010 TO 8060' WBM 04/05/92 (4) TD: 0 PB: 8290 POH W/SECTION MILL MW: 9.8 WBM CONTINUED MILLING FROM 8060 TO 8075'. POOH. RIH MILL #2. MILLED TO 8064'. POOH. 04/06/92 (5) TD: 0'( 0) 04/07/92 ( 6) TD: 8056' (8056) 04/08/92 ( 7) TD: 8565'( 509) 04/09/92 (8) TD: 8822' ( 257) 04/10/92 (9) TD: 9550'( 728) RIH W/8.5 STEERABLE ASSY MW: 9.8 VIS: 83 RIH. PUMPED SLURRY ESTIMATED TOP OF CEMENT IS 7908'. POH SWITCHED TO DRILLING PHASE. CLEANED AND TESTED BOPS. P/U BHA #2. RIH. NOTE: CUMULATIVE COST IS $308,594. RIH W/8-1/2 STEERABLE ASS'Y MW: 9.6 VIS: 72 DRILLING CEMENT FROM 7841 - 7841'. KICK-OFF AT 8015'. CIRCULATED. POOH. RIH. NOTE: CUMULATIVE COST IS $343,342. DRLG. MW: 9.5 VIS: 49 RIH TO 8015'. WASH TO 8056'. DRLG F/ 8056'-8565'. NOTE: CUMM COST SHOULD BE $405,175. DRILLING 8-1/2 HOLE MW: 9.5 VIS: 45 RUNNING DD#2. POOH. L/D MWD. M/U BHA #4 & BIT #3. RIH TO 4400'. DRILL TO 8822' N DRILLING 8-1/2 HOLE TO 9660'. MW: 9.5 VIS: 50 RECEIVED AU S 1 0 199J Alaska 011 & Gas Cons. CommissiOn Anchorage WELL : DS 3-34A OPERATION: RIG : NABORS 2ES PAGE: 2 04/11/92 (10) TD: 9978' ( 428) 04/12/92 (11) TD: 9978' ( 0) 04/13/92 (12) TD: 9978 PB: 9935 04/14/92 (13) TD: 9978 PB: 9935 LOGGING OPEN HOLE MW: 9.7 VIS: 48 CONTINUED DRILLING 8-1/2 HOLE TO 9978'. CBU. POOH. RUN CHT/TEMP/GR/CN/AC DIFL LOGS RUNNING 7" LINER RIH W/BIT #4. RR BIT #1 TO 6198' RUN 7" CHROME LINER. CIRCULATE. MW: 9.7 VIS: 56 RIH. CIRCULATE. POOH. CHANGE OVER TO SEAWATER MW: 8.5 Seawater NOTE CUMULATIVE COSTS IS $799,684. CIRCULATE & RECIPROCATE LINER. TOP OF LINER AT 7742'. PUMP SPACER. PUMPED 426 SX CLASS G CEMENT W/1.0 GPS A600 + .1 GPS D135 + .05 GPS D47 + .3% D65 + .09% D800. RELEASE FROM HANGER. POOH. CIRC. & CHANGE OVER TO SEAWATER. RIH W/PRODUCTION TUBING @ BALE MW: 8.5 Seawater TEST 7" & 9-5/8". L/D 4-1/2 DP. P/U & RUN PRODUCTION TBG 3-1/2 & 4-1/2 13CR. 04/15/92 (14) TD: 9978 PB: 9935 MOVING RIG TO DS 4-30ST MW: 8.2 Seawater RIH W/4-1/2 TUBING. LAND TUBING. INSTALL BPV. ND BOPS. NU TREE. CIRCULATE. SET PACKER. SET BPV. SECURE TREE. RELEASE RIG 0230 HRS. 4/15/92. SIGNATURE: (drilling superintendent) DATE: MAY 29, 1992 DAVE NAKAMURA BP EXPLORATION ALASKA INC. P O BOX 196612 ANCHORAGE, ALASKA 99518-6612 RE: 84-0097 PRUDHOE BAY UNIT DS3-34 P&A 92-0018 PRUDHOE BAY UNIT DS3-34A 407 78-0064 PRUDHOE BAY UNIT DS14-5 P&A 92-0001 PRUDHOE BAY UNIT DS14-5A 407 81-0147 PRUDHOE BAY UNIT DSll-3 P&A 92-0008 PRUDHOE BAY UNIT DS4-34A 407 91-0077 PRUDHOE BAY UNIT DS4-39 407 90-0110 PRUDHOE BAY UNIT L5-26 407 DEAR MR. DAVE NAKAMURA, A REVIEW OF OUR FILES INDICATE THAT BP EXPLORATION ALASKA INC. IS THE OPERATOR OF THE SUBJECT WELL. OUR MONTHLY PRODUCTION REPORTS SHOW THAT THESE WELLS ARE PRODUCING OIL AND WE HAVE NOT RECEIVED COMPLETION REPORTS (407'S) FROM YOU OR THE PLUG AND ABANDONMENT PAPERWORK FOR THE ORIGINAL WELL AS PER OUR CONVERSATION MAY 27. A FORM 407 FOR PLUG AND ABANDONMENT OR WELL COMPLETION WITH DAILY WELL OPERATIONS SHOULD OF BEEN FILED WITH THE COMMISSION WITHIN THIRTY DAYS AFTER THESE WELL WERE COMPLETED. ~PLEASE LET ME KNOW IF THERE IS ANY PROBLEM WITH SUBMITTING THESE FORMS AS REQUIRED IN A TIMELY MANNER. S I NCERELY, STEVE MC MAINS STATISTICAL TECHNICIAN C: ROBERT CRANDALL SR PETR GEOLOGIST STATE OF ALASKA ALASKA .... ', AND GAS CONSERVATION CC qlSSION REPORT SUNDRY WELL OPEHATIONS Operation shutdown Stimulate Plugging X Pull tubing Alter casing Repair well Perforate 1. Operations performed: 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service Other 6. Datum of elevation(DF or KB) 62' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-34 9. Permit number/approval number 84-97/92-026 10, APl number 50 - 029-21132 4. Location of well at surface 846' FWL, 97' FSL, Sec. 112, T10N, R15E, UM At top of productive interval 16' FEL, 2554' FNL, Sec. 15, T11N, R15E, UM At effective depth 90' FEL, 2559' FNL, Sec. 15, T10N, R15E, UM At total depth 96' FEL, 2570' FNL, Sec. 15, T10N, R15E, UM 9860 feet 9231 feet 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Plugs(measured) Cement Plug at 9077' MD. Effective depth: measured 9822 feet true vertical 9196 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 1865# Poleset 110' 110' Sudace 2439' 13-3/8" 2300 sx CS III 2501' 2501' Production 9262' 9-5/8" 500 sx CI "G" & 300 sx CS I 9324' 8720' Liner 779' 7" 300 sx CI "G" 9860' 9231' Perforation depth: measured All perforations covered below cement plug. true vertical All pedorations covered below cement plug. Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9025' MD; 4-1/2", 12.6#, L-80, PCT tail @ 9124' MD Packers and SSSV (type and measured depth) Bet 3-H packer @ 9015' MD; 5-1/2", Otis RQM SSSV @.2~I~MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. . Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection D~ OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Shut In Subsequent to operation Sidetrack 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x,.~. Gas__ Suspended ~ Service Date 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DESCRIPTION 3-3~1 PRE OF WORK COMPLETED SIDETRACK CTU CEMENT PLUG 2/23/92: RIH & tagged 2/2 top of fill at 9579, MD. $/92: A CTU Cement Plug was PUmped to Plu MIR? CTU & PT equiDmen 9610 MD. - - t to 40 g & A nd ~ervals ~. tar, then ,,.._ ~ circular,,".?,r~Or to Side.,-- . 9244 "'. ~'urnped 4.~ L"~=,u eioz n ,,..7~/~Ckino ~o ,_.. 9576 ' 9550, MD (Z4) ,,.,o~ G' -'=~nOUt ' "' 9594' MD (.Z4~ Ref. Log. B' "-- Cement, to pl faic//eclaOw~? to · ,~b'S 7/~- ~"ement Placed 10 bbls of Cement behind pipe & attained a maximum 2/27/92: RIH & tagged the Squeeze Pressure of 200 Psi. POOH. I~D. 1.1 2 9 / 9 2 : t°P °f the cement plug at go77, MD. PT tubing to 1500 psi OK. W/jet cutter & cut 5-1/2, tubing at 8498, MD. Left the Wellbore p from the rir~ .,-_ lugged & A- ~' '*/~/92 . 4/15/9, °?nd. oned .. "" "nO is reV~/°Cr~te~U~uin?e[°ra Sidetracking' The sid SeParate Re o,, ,, etrac~ P" oUndry. '. Was Performed RECEIVED MAY G t992 Alaska Oil & Gas Cons. Cotumissio~ Anchorage ARCO Alaska, Inc. P.O~Boz 100360 Anchorage, Alaska 99510 DATE: 4-27-92 3-15 * 3-34 ~-~2 4-3-92 4-30 2~'-£~ 4-12-92 7-7A ~?~-/~ 4-10-92 9-3 4-18-92 ** ~30ST 3-30.92 gY 12-9 3-28-92 ~Z~/~ ~ 12-19 ~1~92 12-19 4-19-92 4-2 1- 92 8ptnner/Temp/Press R~_m 1,--- Vertilog Run 1, 5" Tu--ing Cutter Run 1, 5" Perf~:~',~r~ Run 1, 5" Collar/Peri R,m 1, 5" PFC/~ Run 1, 5" Perf ~ecoc~- Run 1, 5" Collar fie. in to Jewelry Run 1, 5" Coll_~r/Perf Run 1, 5" Perf (Post°Squeeze) Run 1, 5" Please sign and return the attached copy as receipt of data. RECEIVED' BYT~~~ Have A Nice Da~ ~ ~ C ~ I~/[ ~ .~ SonFa Wallace ~¥ ~ ~5~ APPROVED__ ATO- 1529 ~s~ ~~5 Anchorsge # C]~[EVR. ON D&M # E~"I'ENSION E31~LOR~TION # ,~33[ON ~'~'rHON # ~O]~Z,, #PHILLIPS PB WEI~ FILES R&D # BPX # STATE OF ~KA TEXACO Sch Atlas Arias Sch Aths Atlas Sch Atlas Atlas Sch * The correct well name is 3-34. ** The correct APl# for 9-30ST is 50-029-21411. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, ,~l_~k~ 99510' DATE: 3-20-92 REFERENCE: ~ ~ -'..~ 2_16 ~/- ?~ 3-34 ~/-/a/ 5-34 ~9-32 8Y'~tt~ ~9_32 14-40 ~ 16-9A ARCO CAS~ HOLE 2-25-92 2-29-92 3-1-92 3-7-92 3-7-92 3-8-92 3-6-92 2-25-92 Perf Record Run 1, 5" CCL (Tubl Cutter) Run 1, 5" Packer Positioning Run 1, 5" Verttlog 7" Casing Run 1, 5" Vertllog 9 5/~' Casing Run 1, 5" IqrC/GR Run 1, 5" Tubing Patch Run 1, 5" Perf Record Run 2, 5" Sch Arias Sch Aths Aths Aths Sch Sch Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day~ Sonya Wallace ATO- 1529 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL_ _: # PHILLIPS PB WELL FILES R&D # BPX # STATE OF AI2~KA TEXACO RECEIVED APR 0 1 1992 Alaska Oil & Gas Cons. Commission Anchorage ARCO..ALASKA..~ _I,R_UDHOE BAY -__PBGC RECEIVED .cEB 2 8 1.992 ~AX._TRANSM.!_TTA L:,C_O¥-ER- ,M~,sKa uH & 6as Cons. Commission Anchorage ._~ RM & BLDG_ .PHONE p_I,_EASlg NUMBE__R_ALL. P_AGE$__AND_U_$;E BLACK=iNK ONLY PLEASE. XEROX COPIES FOR: REMARKS; () () () () () () () () () () () () () () () () () () () NUMBER OF P AGEg FOI .I OWING COVER ANC ARCO Ml~$~l.}l! ~N'r~ - (ATOI^N0) ANC ACCI)UNTINO - ~ ~ - (A~) ~C ~T~ ~~VA~ON5 - (ATO) ~C ~~~ ~~ - (A~) ~C D~O - 14~ ~- (A~) ~C ~ ~O~A~O~ - (ATO) ~C ~ ~R - 21~ ~- (A~) ~C PA~I~ BNa- 13~ ~ - (ATO) ~C ~IO~ ~~ - (~) ~C ~B~ ~O~NO - 4~ - (ATO) ~C O~~ON{ B~R - 15~ ~- (A~) ~C ~H~ ~~ON{ - l l~ - ~C P~~~O- ~ ~.- (~O) ~C K~~ O~TION~ - 1 l~- (~O) K~~ ~D - (NgK) LOS ~O~ ~9~B ~~ - (~) P~AD~A (~~ONg) - ~NO- ~C) BPX. (~C) / AFTRR TRANSMISSION RETURN TO: BOXY_ . ~-' ~ .... OR TRASH .. SF.,NT By OMNIFAX (907)659-59.73/5283 PRUDHOE BAY MESSAGE CENTER (907)659-5128 TgLEX 09-3;5338 IF YOU DO NOT RE_CEIVE _ALI. ,PAGES CALL _.fg07) 659.W128 FEB-28-' 92 11: O~L ! D: PRB MESSRGE CENTER ~L MU: bo~-~z~o ~ ~.9?Well Wore Log ~i~ ~ w~ ~ ......................... T~/TT Sizes . ............. Estimate. ~: ~ ~': ~'~ ....... ~,~ ............... ~: .... R~ C~~ ED ~E'.B 2 8 1992 A~-k NO, ] C~ # ......................... · .- ............................oo ~ 7~ ._ j ~ ~ [~ ~ ~ ~ ) L'.: .......................... ....... .. ~~ ,~ - ~~ ............................ e., ,,.~ ~¢ ..... ~:, ~: ~ ~O~:_.~_..,_~. ~<~=._m~: ~ ............... ................. {--- m~sYa ult & Ga~i3ons. Ccm Anchorage Total Fluids ALAb~, OIL AND GAS CONSERVATION COMMISS,,...~ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend X Operal~on Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __ Change approved program __ Pull tubing Variance ~ Perforate __ Other X Plug Back tor Redrill 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 97' FSL, 846' FWL, Section 11, TION, R15E, UM At top of productive interval 2554' FNL, 16' FEL, Section 15, TION, R15E, UM At effective depth 2559' FNL, 90' FEL, Section 15, TION, R15E, UM At total depth 2570' FNL, 96' FEL, Section 15, TION, R15E, UM 5. Type of Well: Development x Exploratory __ Strafigraphic ~ Service 6. Datum elevation (DF or KB) RKB = 62 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 3-34 9. Permit number 84-97 10. APl number 50- 029-21132 11. Field/Pool Prudhoe Bay Field~Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 9860 feet Plugs (measured) 9231 feet 9822 feet Junk (measured) 9196 feet Length Size Cemented Measured depth True vertical depth 110' 20" 1865# Poleset 110' 110' 2439' 13-3/8" 2300 sx CSIII 2501' 2501' 9262' 9-5/8" 500 sx Cl G & 3OO sx CSI 9324' 8720' 779' 7" measured 9422'-9550'; 9576'-9594' true vertical 8815'-8938'; 8963'-8980' 300 sx Cl G 9860' 9231' Tubing (size, grade, and measured depth) 5-1/2" 17#L-80 @ 9025'; 4-1/2" 12.6#L-80 tail@ 9124' Nas~a 0it & Gas Cons. 'Anch0mge Packers and SSSV (type and measured depth) Baker 3-H Paxker @ 9015'; Otis RQM SSSV @ 2214' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation February 21, 1992 16. ff proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended. X Service 17. I her,eby certify that the fp..regoing is true and correct to the best of my knowledge. Signed -,, ---<~'~,~- Title Workover Superintendent FOR COMMISSION USE ONLY Date ~'~C~ ~__ Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- /7~ ~ Approved by order of the Commission OR!GiNAL SIGNED BY Commissioner Date Form 10-403 Rev 06/15/88 LO.,"~NIF C SMITH SUBMIT IN 'TRIPLICATE 3-34 PLUGBACK PROCEDU_ Procedure Outline: _(Refer to attached wellbore schematic) 1. Notify an AOGCC representative prior to commencing operations. 2. Rig up coiled tubing unit. , RIH with coil tubing circulating seawater. Lay a cement plug from cUrrent PBTD of _+ 9581' MD to at least 100' above the top perforation (top perforation at 9422' MD -- cement top no deeper than 9322' MD. 4. RU slickline unit. RIH and confirm cement top at least 100' above top perforations. Note' Tag to be witnessed by AOGCC representative. 5. RU E-line and make a tubing cut at +/-8500' MD based on completion tubing tally. 6. Circulate well over to seawater and freeze protect well to 2000'. 6. Bleed tubing, inner annulus, and outer annulus to 0 psi. 7. Set 5-1/2" BPV and prepare Pad for RWO. 8. MIRU rig. Pull BPV. Circulate out freeze protection. 9. FIIH with a 9-5/8" bridge plug and set at 8490' MD weight. · Pull 5-1/2" tubing. Test w/15,000#'s of pipe 10. Spot 200' of cement on top of the bridge plug (8290'- 8490' MD). Note' Steps #9 and 10 are a variance ofstate regulation 20 ACC 25.105(h)(2) on the placement of a liner top cement. Although the liner top plug is higher above the liner top than as specified in the regulations, an bridge plug, a weight test of the bridge plug, and 200' of cement on top of the bridge plug set 600' above the 7" liner top is believed to be a Competent plugback. RECEIVED FEB 18 1992 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION SU BJ ECT BASED ON ENGINEERING DATA ENGINEER DEPT. APP'VL DATE SHEET NO.__ OF__ BUDGETIAFE NO, FILE NO. 5000 PS1 B( $TACK 13- ,= ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1.13~ CASING HEAD 2. 5000 PS! TUBING HEAD 3.13.5/1t' - 5000 PSI PIPE RAMS 4.5(:X:)0 P~I DRILLING SPOOL 5.13.5/8' - 5000 PSi BLIND ~ 6. 13-5/~ - 5000 PSI PIPE RAM~ 7. 13-5'~ - 50<X) PSI ACCUMULATOR CAPACITY TEST I. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL wm-! HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WiTH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECOR~ THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUI'~ OFF. 4. RECORD ON THE [ADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIM~. AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG W~LL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD, 3. CLOSE ANNULAR PREVENI~R AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSi AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN ~LAR PREV~ AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSLF:IE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZEJ=IO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANI~ VALVES, IF ANY, w1'rH 5(X)O PSI UPSTREAM OF VALVE AND WITH ZERO PS1DOVVlqS3T:IF_AM. BLEED SYSTEM TO ZERO PSI. g. OPEN PIPE RAMS. BACK~ RUNNING JT AND PULL OUT OF HOLE. CLOSE BUND RAMS AND TEST TO 5000 PSi FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSII:~ BOP TO 5000 PS1 WITH KOOMEY PUMP 13. RECORD TEST INFORMATION ON BLCTWOUT PREVENTER TEST FORM. $.O,~ AND SEND TO DRIUJNG SUPERVISOR. 14. PERFORM CO~ BOP TEST ONCE A WEEK AHD FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETIC,% WORKOVER OPEP~TION3, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. RECEIVED FEB 1 8 t992 hl_asla fill A Gas Cons. commission ~chorage DAM 11/20/8g BOP SCH (FOR: NAB 2ES) ARCO ALASKA, INC. F',O. BOX t0'3360 ANCHORAGE, ALASKA /6 DATE' t 2-3i-9t REFERENCE' >';'' t .=t 9 z- t-26 ~, 2-33 4-7 4-t2 9-t7 qq~"~ ; 9-38 PLEASE ARCO CASED HOLE FINALS __ '3-27-9t/'~LEAK DETECT t-5-9t ,/ PROD PROFILE t-5-9t ~/ PROD PROFILE ~-2-9~ JEWELRY t-i9-9t ~ 1NJ PROFILE t-i8-9i~,-/GAS LIFT t-23-9i -/LEAK~, DETECT i-~4-9i~PROD PROF-ILE/PI 0-28-9t LEAK DETECT . i-t6-9i INJ PROFILE/PITS i-i~-~i~ LEAK DETECT t t-2i-~i ~ GR/CCL TIE-IN i-ii-~t~ PRODUCTION ti-t9-9t/. F'ROg F'ROFZLE t i-29-9~ ¢ INJ PROFILE t-3-9i ~/ INd PROFILE ~-2i-~i v INJ PROFILE RUN t, t" RUN t, 5" RUN i, 5' RUN t, 5" RUN t, RUN t, 2"&5" RUN i, 2"&t~" RUN t, RUN i, RUN t, 5" RUN i, 5' RUN i, 5' RUN i, 5' RUN t, 5' RUN RUN t, 5' RUN i, SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF DATA RECEIVED_ BY ~__~ HAVE A NICE DAY! $ONYA WALLACE AT0-t529 APF'ROVED TRANS~ 9tI CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO UAHCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D BF'X STALE OF ALASKA TEXACO RECEIVED dAN 10 199z Alaska Oil & Gas Cons. Gommissior. Anchorage ARC(] ALA."--:.KA., INC, F'.O, B,']X A N C H 0 R A DATE' i ¢'-2S-9i REFERENCE' ARCO CA£'ED HOLE FINAL~ 2-9f./ 8-2i-9~ 2-2S/ 9-4-9'i 2-26 8-'23-9 ~ X? 2-~0 ~ 9-4-9~ 3-J 6~ 9-J 6-9 3-~7~ 9-~9-9~ 3-30~ 8-28-9 3-34~ 8-29-9J 4-4 ~ -~-~ 4-7 ~ ~-2-9'i 4-~ ~ 9-2~-9~ 4-29~ 9-~8-9~ F'RE-FRAC INJ PROFILE PROD PROFILE F'ITS' PITS GR/CCL INJ PROFILE IN.J PROFILE LEAK DETECT F'ROD PROFILE JEWELRY IN.J PROFILE F' F,,' 0 D PROFILE PROD PROFILE PROD PROFJ:LE PROD PROFILE JEWELRY/GR./CE:L-TAG F'tT~ _ - - LEAk' DETECT -' - RUN i , ..,.¢" RtJN i , 5 · RUN i, D" I;..'UN t, 5· RUN i , D · F:UN i , 5" RUN t , 5" RUN i: 5' RUN i , 5" RUN ~, 5" RUN ~ , 5' RUN ~, ~" i;:UN i , 5" RUN ~, K-'." RUN i, .,-""" RUN ~, 5" RUN ~ , ~ ~ · CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAHCO CAMCO CAMCO CAt'iCO CAMCO CAML;O CAHCI.] CAMCO C~i"ICO CAMCO CAMCO : F'i EA:--',E SIGN ANO RETURN THE-,~ATTACHED-COF'Y.A~,~ECEIPT OF DATA. . .... :: .....: ' .............. .-: .... ... ....... H A V iS A N i C:E DA Y ! ' ii & Gas Cons. Commission ~ Nas~ 0 - - m-e ~ ....... ~::" -':' - ~'"~, L,--*'~,~' * -:: :. :: ..... -_. :_: :-: .... ::: ~.:~C,O ,"-,,,L~.... ~-'n'-".~" ~-T-- '~,,~, ~:' .... ::'-' "'--' ......... DISTRIBUTION ~ .--i ~ CENTRAL FILES ~ ~ F'HiLLIF'~ ~' CHEVRON F'B WELL FILES' D & M R & D '"--,. EX T E N.'_? I 0 N. E Y r:' [,,, _ ri h..' A i' i 0 N_ . ,-'"'B F' ",",, ~ E','XON ¢ ,S']'A]"E tJF ALA;.,:.'KA H A R A l'H 0 N 7' E X (:~ [.: 0 ~- MOBIL THE COREECT AF']:~ F'OR 2-9 TI--!!E CORRECT API-~ FOF,.: 2-36, I3' 5,3,--;3,29-222;,:;,2. THE COREECT AF'I~ FOR 4-4 '[£ 56,-,:'}29-20(-}96, STATE OF ALASKA _.~ ALA~'-'''~, (.)IL AND GAS CONSERVATIO 'OMMISSION REPOP, I' OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 846' FWL, 97' FSL, Sec. 11, T10N, R15E, UM At top of productive interval 16' FEL, 2554' FNL, Sec. 15, T11N, R15E, UM At effective depth 90' FEL, 2559' FNL, Sec. 15, T10N, R15E, UM At total depth 96' FEL, 2570' FNL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratow Stratigraphic Service 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-34 9. Permit number/approval number 84-97/9-833 10. APl number 50 - 029-21132 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9860 feet 9231 feet Plugs(measured) Effective depth: measured 9822 feet true vertical 9196 feet Junk(measured) Casing Length Size Conductor 110' 20" Su dace 2439' 13-3/8" Production 9262' 9-5/8" Liner 779' 7" Cemented Measured depth True vertical depth 1865# Poleset 110' 110' 2300 sx CS III 2501' 2501' 500 sx CI 'G' & 300 sx CS I 9324' 8720' sx R FEE IV E D 9860' 9231' Pedoration depth: measured 9422-9550'; 9576-9594' true vertical 8815-8938'; 8963-8980' D EO - 4- 1990 Alaska Oil & Gas Cons. Commission Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9025' MD; 4-1/2", 12.64¢, L-80, PCT tail @ 9124' MD Packers and SSSV (type and measured depth) BeT 3-H packer @ 9015' MD; 5-1/2', Otis RQM SSSV @ 2214' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 868 1168 1582 577 852 2782 Tubing Pressure 300 267 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DS 3-34 FRACTURE TREATMENT OF ZONE 4 DESCRIPTION OF WORK COMPLETED I I/22/89: MIRU & PT CT to 4000 psi. RIH w/Bridge Plug & set plug at 9562' MD, to isolate open perforations at: 9576 - 9594' MD Ref. Log: BHCS 7/24/84. Pumped 7 bbls of sand slurry on top of plug. Flushed CT w/Meth-Water. POOH. RD. I 2~6~89: RIH & tagged top of sand at 9536' MD. POOH. RD. I 2/7/89: RIH & replaced LGLV's w/DGLV's. POOH. RD. I 2/11/89: MIRU, & PT equipment to 7000 psi. Pumped a propped fracture treatment through open perforations at: 9422 - 9550' MD Ref. Log: BHCS 7/24/84. (Note: 9536 - 9550' MD :covered w/sand above bridge plug). Pumped: a) b) 100 bbls Pre Pad, @ 40 - 45 bpm, followed by Shutdown. Resumed c) d) pumping: 100 bbls Pre Pad, w/crosslinker, followed by Shutdown. Resumed e) f) g) h) pumping: 1489 bbls Cross Linked Water Pad, @ 45 bpm, followed by 501 bbls Slurry w/proppant concentrations of 1 to 12 ppg, followed by 218 bbls Flush. Shutdown. ISIP @ 2904 psi. Placed a total of 105,300 lbs of proppant into formation. Rigged down. 12/16/89: Performed a proppant fill cleanout, and pulled bridge plug from wellbore. RD. I 2/1 7/89: Replaced DGLV w/OGLV. Returned well to production, and obtained a valid production test. ~F_.O '" ~ ~°~°J0 ARCO Alaska, Inc~'-''' Prudhoe Bi. ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 18, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-34, Permit No. 84-97 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Sincerely, D. F. Scheve DFS/DRR/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 3-34)W1-3 RECEIVED SE'P ! 91989 Alaska 0ii & Gas Cons. C0mmissi0i~ Anchorage ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKP"~ILAND GAS CONSERVATION C '.MISSION APPLIC . 'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate . X Change approved program Pull tubing Vadance Perforate Other 5. Type of Well Development X Exploratory Stratigraphic Service 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 6. Datum of elevation(DF or KB) 62 RKB feet 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 846' FWL, 97' FSL, Sec. 11, T10N, R15E, UM At top of productive interval 16' FEI, 2554' FNL, Sec. 15, T11 N, R15E, UM At effective depth 90' FEI, 2559' FNL, Sec. 15, T10N, R15E, UM At total depth 96' FEL, 2570' FNL, Sec. 15, T10N, R15E, UM 8. Well number 3-34 9. Permit number 84-97 10. APl number 50 - 029-21132 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9860 feet Plugs(measured) 9231 feet Effective depth: measured true vertical Casing Length Conductor 110' Surface 2439' Production 9262' Liner 779' Perforation depth: 9822 feet 9196 feet Junk(measured) Size Cemented 20" 1865# Poleset 13-3/8" 2300 sx CS III 9-5/8" 500 sx CI 'G' & 300 sx CS I 7" 300 sx CI 'G' measured 9422-9550'; 9576-9594' true vertical 8815-8938'; 8963-8980' Measured depth True verticaldepth 110' 110' 2501' 2501' 9324' 8720' 9860' 9231' RECEIVED SEP ! 91 9 Alaska Oil & Gas Cons. Commissi [: Anchoraae Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, POT @ 9025' MD; 4-1/2", 12.6#, L-80, POT ta'll @ 9124' MD Packers and SSSV (type and measured depth) BOT 3-H packer @ 9015' MD; 5-1/2", Otis RQM SSSV @ 2214' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation September 1989 16. If proposal was verbally approved Oil x Gas Name of approver Date approved Service 17. I hereby~ertify that t~e foregoing is true and correct to the best of my knowledge. Sig ned ,~~/~/~)~ Title Operations Engineering Manager FOR ~OMMI~;ION H~E ONLY 15. Status of well classification as: Suspended Date Conditions of approval: Notify Commission so representative may witness Plug integrity . BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH I Approval No. ?__~.,,~ ,,~ Approved Cop'/ Returned co m,S Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE J 3~ Drill site 3-34 ivishak Formation HydrauliC Fracture Treatment . . pRELIMiNARY pROCEDURE ARCO Alaska intendS to pump a hydraulic fracture stimulation in well 3-34 as outlined in the procedure below. Pull gas lift valves and replace with dummy valves, pressure test tubing / casing annulus. , . · olate the bottom set the nt~ DtU WtUt tv~,__.,;~, ~,n~ me Set sa...- ,:._g_~ ~9576-9~'*~ ° .... of pertorauo~,o ~ Rig up fracturing service company- linked water The interval to be Pump propped fracture treatment at 40-45 BPM using a cross , maximum injection rate possible will be system with approximately 63,000 Ihs of 16-20 proppant. . outlined as (~4~ -9510. The -r~,~, n mD schedule ~s stimulated is from ,,__2 . . . . .,,~ ,.u _ obtained following pressure hm~tat~ons follows: A. 1000 Bbt cross linked water pad B. C. D. E. 50 Bbl 2 pPG in cross linked water 50 Bbt 4 pPG in cross linked water 50 Bbl 6 pPG in cross linked water 50 Bbl 8 pPG in cross linked water 50 Bbl 10 pPG in cross linked water F. Rig up CTU and cteanout to pBTD. open well to flow gradually increasing the drawdown to allow proper iracture healing. . install gas lift valves. RECEIVED SEP 1 91989 Alaska Oil & Gas Cons. Commission, Anchora.Qe 5 Alas~ COILED TUB].Ni~ UNIT BOP E0U l PHENi 1. 5000 PSI 7" W[LLH[.AD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. D000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 RECEIV ' I s~P 1 ~191~9 Gas Cons. Comm~ss,o~. Anchorage HiREL]NE BOP EOU]PHENT 1. 5000 PSI 7" WELLHEAD CONN£C10R FLANGE 2. 5000 PSI WIR£LINE RAMS (VARIABLE SIZE) .1. 5000 PS~ 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF A:;.~CO ALA,':_,~KA., iN(i, P .. 0. B 0 X i ;-.) 0 '~ 6,:-) ANCHORAGE, ALASKA 975t0 DATE' 7-i8-89 REFEI.~Eb.!CE' ARCO PI;.'E£$URE DATA 3'.-S 7-'_'3.'-89 :5-9 7-5-89 S--.2':.-':;,6-i i-89 S-26 6-2i -89 S-SO 6-i 2-89 ¥-S ! 7..-6-89 5-.5.5 7-6-89 5-.54 6- i S-89 4-4 7--8-89 4-:.5i 6-i4-89 7-34 6-S0-89 i i-.5 7-7-89 i i '-4 7-7-89 i 2-S2 6-t 7-89 i 6-9 6-22-89 i 7-~ 7-6-89 i7-9 -7-8-89 BHF'--STATIC GRAO IENI" BHF'--$TAT IC (;I;..'A O I ENT BHP--F'LOWING gRADIENT BHF'--FLOWiNG (;-RAD I EN'r BHF'--FI_OW i i,~g GRADIENT BHP--:~{TAT :[ C t;I;:AD lENT BHP--STATiC GRADIENT BHP--F'LOWING GRADIENT BHP--STATIC GRADIENT BHF'--STATIC BHF'--$TATIC BHP-=STA'i'IC BHP--STATIC BHP--$TATIC BHP--FLOW'I:NG BHP--STA'i' I C BHP--STATIC GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT CAMCO CAMCO CAMCO CAMCO CAMCO (]AM(]() CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO_ PLEASE SIGN AND RETURN '/HE ATTACHED COPY AS RECEIPT OF DATA. DISTRIBUTION CENTR~Au,- FILES-- ._ CHEVRON "~ '~: .- D &-M .~-, ~- EXTENS-I_ON: EXPLORAT I ON EXXON.,- ,- -.,': ~ ..... MARATHON,:~..:.z.'~- _ .- . MOBIL PHILLIPS PB WELL FILES R &.D -- BPX STATE OF ALASKA TEXACO ARCO ALA'ZKA, INC P., O. BOX i ANCHORAGE, ALAY~<A 995i DAi-E 7-i ~-89 REFERENCE' ARCO CASED HOLE FINAL~ i-25 6/"-23-24/89 LEAK DETECTION 3-i 6-i4-89 F'RODUCTION F'ROF"II_E ~:'~-,--o°' 6-2 i -89 F'R. ODUCi' I ON PROFIi. E 3-34 6-~3-89 PRODUCTION F'ROF.[LE ~.-34 6-i9-89 F'IT3' 4--t 9 6-! :5-89 INJECi-ION F'F,'OFILE 4-3 i 6- ~ 4-89 i'EMF' 9-i6 6-J8-89 INJECTION PROFILE J J-i 6-t 6-89 PRODUCTION PROFILE i J-24 6-i7-89 F'RODUCTiON PROFILE J3-6 6-2~-89 INJECTILiN PROFILE J4-27 6-25-8',~ PRODUCTION PROFILE J4-37 6-,~6-.N9 PRODUCTION F'ROFILE ~4-38 6-23-89 PRODUCTION PROFILE J6-9 6-22-89 PRODUCTION PROFILE RuN i , RUN i, RLJN i, I:;:tJN i , RUN i, RUN i, F;.'.UN i , i:;,'UN i, RUN i, RUN t, RUN t , RUN i ~ RUN I ,, RUN i, RUN i , PLEASE SIGN AND RETURN THE RECEIVED BY HAVE A NICE DAY! SALLY HOFF'ECKER ATO- ~ 529 ATTACHED COPY AS RECEIPT OF DATA C A ti L; 0 t'.;: A f'-! C 0 C A M L; C) C ;~ri C 0 C A ~--~ C 0 C A M t'; rj C A M C 0 C Atq C 0 CAMC(] CAMCO CAMCO CAMCO CAMCO CAHCO DISTRIBUTION CENTRAL FILES ~ ~ FIHILLIF'5' CHEVRON ~'B WELL F'ILE3' EXTENSION. EXPLORATION ',I:.BF'X EXXON ~ ~?:'ATE, OF ALA3'KA MARATHON ~'~- TEXgCO MOBIL ARCO ALASKA, INC, F',O, BOX ANCHORAGE, ALASKA 9951 ~, DATE' 7-t0-89 REFERENCE' ARCO CASED HOLE FINAL2 i -25 6/23-24/89 3-t 6-i 4-89 3-:)6...6-~t.- -89 3-34 6-i 3-89 3-34 6-i 9-89 4-i 9 6-i 5-89 4-3i 6-1 4-89 9-i 6 6-t 8-89 ~ ~-i 6-~ 6-89 ~ ~ -24 6-i 7-89 i3-6 6-'~3-89.= ~ 4-27 "~ 6-25-89 i4-37 6-26-89 i 4-38 6-23-89 i 6-9 6-22-89 LEAK DETECTION PRODUCTION F'ROF' I I_E F'RODUCTION PROFILE PRODUCTION PROFILE PITS INJECTION PROFILE TEMP INJECTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE INJECTION PROFILE F'RODUCTiON PROFILE PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE PLEASE £IGN AND RETURN THE ATTACHED COPY AS RECEIPT OF RL.:N t , RUN i, 5" RUN t, 5" l:~,'tJN t , 5" RUN i, 5" RUN i, "fi" RtJ N t , 5 · I;:UN t, 5" RUN t , 5' f'::~JN 1, 5' RUN t, 5' RUN t, 5 · RUN t , 5" RUN t, 5 · RUN i , 5 · DATA, C A M L; 0 C A ~'.l C 0 L.: A t,i L; LJ C A ~',i C (] C A ~-,~ C 0 C A ~4 C 0 ......... UA~"~L;U CAMCO C A ~ C 0 CAMCO CAMCO CAMCO CAMCO CAMCO CAHCO RECEIVED BY _._, .................. SALLY HOFF'ECKER VED~..___ CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL ~~ P, HILLIF'$ F'B WELL F'ILE2 R & D $ BF'X ~ s'i'A'l'E OF ALA6'KA ~~ I'EX~CO ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 23 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-34 Permit No. 84-97 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi (DS 3-34)W1-3 ~Jas_J~ j~jj & Gas 80,$. C0mr~issi0~ WELLS3/97 ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany AR3B--6132-C .---- STATE OF ALASKA ""'" AL ~KA OIL AND GAS CONSERVATION COMM, _,ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Alter casing __ Change approved program __ 2. Name of Operator .~.CO Ala~_-, Inc. 3. Address P.O. Box 100360 4. Location of well at surface Suspend __ Operation shut(town __ Re-enter suspended well __/ Repair well __ Plugging __ Time extension __ Stimulate ~ Perforate __ Other __ 6. Datum elevation (DF or KB) 62' ~KB Pull tubing __ Variance __ I5. Type of Well: Development Exploratory Stratigraphic Service Anchorage, AK 99510 R15E, UM R15E, UM R15E, UM R15E, UM 8 ' 97' Sec 11 TiON ~ ,pro~6p o~4L ~uct,veinterv~FSL' . , , 16' FEL, 2554' FNL, Sec. 15, TllN, Ateflecti~edepthTM 90' FEL, 2559' FNL, Sec. 15, T10N, ~totaldepth 96' FEL, 2570' FNL, Sec. 15, T10N, Prudh, 12. Present well condition summary Total depth: measured true vertical 9860 feet Plugs(measured) 9231 feet feet Z UnitorPropedyname Prudhoe B~y Unit 8. Wellnumber DS 3-34 9. Permitnumber 84-97 10. APInumber 50-- 029-21132 11. Field/Pool ,e Bay Oil Pool Effective depth: measured true vertical Casing Surface Intermediate Production Liner ~ngth 110' 2439' 9262' 779' 9822 feet Junk(measured) 9196 ~et Size Cemen~d Measuredde~h 20" 1865# Poleset 13-3/8" 2300 sx CS III 9-5/8" 500 sx Cl 'G' & 300 sx CS I 7" 300 sx C1 'G' ~uevedicaldepth 110' 110' 2501' 2501' 9324' 8720' 9860' 9231' Perforation depth: measured 9422-9550'; 9576-9594' true vertical 8815-8938'; 8963-8980' Tubing (size, grade, and measured depth) 5½", 17#, L-80 to 9025' MD w/4½", 12.6#, L-80 tubing tail Packers and SSSV (type and measured depth) Brown 3-H packer set @ 9015' MD; Otis RQM SSSV @ 2214' MD to 2das Oil & Gas Cons, Commission[ 9124' 13. Attachments Description summary of proposal ~ Detailed operations program __ BOP sketch 14. Estimated date for commencing operation I January 1989 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby c~rtify that the foregoing is true and correct to the best of my knowledge. Signed ~//~',~ 2~.,~ TifleOperations En~ineerin~ Manager FOR COMMISSION USE ONLY 15. Status of well classification as: Oil _~ Gas__ Suspended __ Date ,~ .r/~' Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- ,'~} ~ [Approval No. ¢ -- ~),~-~7~ ORIGINAL SIGNED BY Approved by'order of th~,~)l~ni~sib~l~H ,~o,_n'oved Copy Returned Commissioner Form 10-403 Rev 06/15/88 WELLS3/97 T. P. Allen, 263-4827 SUBMIT IN TRIPLICATE Drill Site 3-34 HCL Perforation Wash and Scale Inhibitor Treatment ARCO Alaska, Inc. proposes to perform a HCL perforation wash followed by a scale inhibitor treatment on Well 3-34. These treatments will be performed as follows: I , Obtain a wellhead sample fluid sample from Well 3-34 and perform emulsion and sludging tests with HCL acid. Add non-emulsion and anti-sludging additives to pass ARCO's emulsion/sludging tests. 2. MIRU a wireline unit. Tag PBTD to ensure fill is not covering the perforations. 3. Obtain a representative well test. . Load 7000 gals of 12% HCL. Titrate the acid to determine acid strength and check the iron content. 5. Load 1100# of solid diverter and 80 gals of liquid diverter: . Batch mix 1500 gals of 12% HCL with additives and 1100# of solid diverter and 80 gals of liquid diverter. 7. MIRU pump trucks, transports and CTU. 8. RIH with coiled tubing. 9. Load the Coiled tubing/tubing annulus with 195 bbls of dead crude'. 1 0. Roll all acid compartments on location before pumping fluids downhole. 1 1. Pump the following fluids down the coiled tubing: A. 1500 gals. of 12% HCL w/additives. B. 1000 gals. of 12% HCL w/additives and solid and liquid diverter. Reciprocate across the entire perforated interval during this stage. C. 2000 gals of 12% HCL w/additives. Reciprocate across interval after 1000 gals of this stage is pumped. D. 500 gals. of 12% HCL w/additives and solid and liquid diverter. Reciprocate across the entire perforated interval during this stage. E. 2000 gals of 12% HCL w/additives. Reciprocate across interval after 1000 gals of this stage is pumped. F. 1000 gals of diesel. Reciprocate across the entire perforated interval. G 1000 gals of Xylene. Reciprocate across the entire perforated interval. H. Displace the coiled tubing with methanol/water. Reciprocate across the entire perforated interval. 12. Immediately place the well on production utilizing the artificial lift system. 13. POH with Coiled Tubing. 14. 15. After all stimulation fluids have been recovered, place the well in the test separator and obtain a representative test. If the well exhibits a positive increase in production from the HCL,-pe~f~t~.'~r~jv~, continue with the scale inhibitor. ~..~ i';,~- L;~ ~"' :,. ~lchorage Drill Site 3-34 Stimulation 'l,eatment Page 2 16. 17. 18. 19. 20. 21 22. 23. 24. 25. 26. Perform a fluid level survey on the 5 1/2" x 9 5/8" annulus. Fluid pack the 5 1/2" x 9 5/8" annulus with dead crude. Load 50 bbls. of filtered fresh water for blending the EDTA. Load 132 bbls. of filtered 2% NaCI water for blending the scale inhibitor. Mix the remaining 2000 gals. (48 bbls) of filtered fresh water adding: -1550 lbs of Na2EDTA -4 gals of F75N, NE-18 or Losurf 300 -2 gals of A186, C1-9 or MSA Check the pH, iron content and EDTA content. Mix one of the current acceptable amine phosphonate inhibitor blends. Load 450# of solid diverter and 35 gals of liquid diverter. Load 25 bbls of methanol and 780 bbls of diesel. Batch mix the 48 bbls of EDTA with 450# of solid diverter and 35 gals of liquid diverter. MIRU pump trucks and transports. Pump the following fluids down the production tubing: A. 25 bbls of diesel B. 25 bbls of methanol C. 48 bbls of EDTA with additives and the solid and liquid diverter D. 138 bbls of scale inhibitor blend E. 750 bbls of diesel F. 220 bbls of dead crude G 5 bbls of diesel Shut in the well for 24 hrs. RD and release equipment. Obtain a valid well test at a wide open choke setting. 6 ,5 4 3 2 COILED IUBING UNIT BOP EOU 1 PMENT 1. ~000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RAMS 3. ~:)O0 PSI 4 1/6" HYI:)RAULIC SLIPS 4. ~:)00 PSI 4 1/§" SHEAR RAMS 5. ~X)C) PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUIrlrlNO BOX HIRELINE BOP EOUIPMENT 1. 5000 PSI ?" WELLHEAD CONN£CIOR IrLANG£ 2. 5000 PSI WIRELIN[ RAMS (VARIABLE SIZE) S. ~OOO PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ;- '"-'" STATE OF ALASKA "~*' ALAS,. OIL AND GAS CONSERVATION COMN _,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 5. Datum elevation (DF or KB) 62' RKB 2. Name of Operator ARCO Alaska, Inc. 3. Address Post Office Box 100360~ Anchorage~ AK 99510 4. Location of well at surface 846' FWL, 97' FSL, Sec. 11, T10N, R15E, UN At top. of productive interval 16' FEL, 2554' FNL, Sec. 15, TION, R15E, UN At ~6~c~i~de~==nth ~=' FNL Sec 15 TION R15E UM At~l~tctl~l~t,h 2570' FNL, Sec. 15, T10N, R15E, UN 11. Present well condition summary Total depth: measured true vertical 9860 feet 9231 feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 3-34 8. Approval number 84-97 9. APl num~e2r9_21132 50-- lO. POO~rudhoe Bay Oil Pool Effective depth: measured 9822 feet true vertical 9196 feet Plugs (measured) Junk(measured) Casing Length Size Cemented Measured depth Conductor 110' 20" 110' Surf~8e 2501' 13-3/8" 2300 sx 2501' Production 9324' 9-5/8" 500 sx 9324' Liner 779' 7 300 sx 9860' Perforation depth: measured 9422' -9550', 9576' -9594' true vertical 8815' -8938' , 8963' -8980' Tubing (size, grade and measured depth) 5½" 17# L-80 to 9025' with 4½" 12.6 # L-80 tubing tail to 9124' Packers and SSSV (type and measured depth) Brown '3H' Packer set @ 9015', Otis RQM SggV (a 7214' (2214'MB) 12. Stimulation or cement squeeze summary 13. (8528')MD Intervals treated (measured) N/A Treatment description including volumes used and final pressure True Vertical depth 110' 2501' 8720' 9231' OiI-Bbl Prior to well operation NONE Subsequent to operation 3~"~5 2735 136 340 878 14. Attachments Daily Report of Well Operations ~ Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Gas-Mcf Water-Bbl Casing Pressure Signed ,~¢-2//'~. /~ Form 10-404 Rev. 12-1-85 CNB (263-4643) Title Operatio,ns Engineering Manaqer Date Submit in Duplicate Tubing Pressure Representative Daily Average Production or Injection Data Began perforating operation 4/10/86. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 9441'-9445'MD (4 spf), flow well to.'' clean up. Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval'' 9431'-9441'MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #3, shot interval 9575'-9593'MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #4, shot interval 9525'-95~'MD (4 spf), flowed well to clean up. Shut-in well, POOH, all..shots fired. Ran SSSV, secured well, RD. Shut-in well, POOH, all shots fired. RIH with: gun #5, shot interval 9505'-9525'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #6, shot interval 9480'-9505'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #7, shot interval 9455'-9480'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #8, shot interval 9421'-9431' and 9445'-9455'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. REF- CBL 2/27/86 .~--. STATE OF ALASKA ALASi OIL AND GAS CONSERVATION COMf~ SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate.~ Pull tubing Alter Casing ~ Other ~ 2. Name of Operator ARCO Alaska, Inc. 3. Address Post Office Box 100360~ Anchorage~ AK 99510 4. Location of well at surface 846' FWL, 97' FSL, Sec. 11, T10N, R15E, UM At top of productive interval 16' FEL, 2554' FNL, Sec. 15, T10N, R15E, UH At ¢~fFc~:t d, e~t~59' F,L, Sec. 15, T10N, R15E, UM At~l~;t¢llC~PL.t,h 2570' FNL, Sec. 15, T10N, R15E, UM 5. Datum elevation (DF or KB) 62' RK~B Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 3-34 8. Approval number 84-97 9. APl number 50-- 029-21132 lO. POO~rudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 9860 feet 9231 feet Effective depth: measured 9822 feet true vertical 9196 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Conductor 110' 20" Surface 2501' 13-3/8" 2300 sx Production 9324' 9-5/8" 500 sx Liner 779' 7 300 sx Measured depth True Vertical depth 110' 110' 2501' 2501' 9324' 8720' 9860' 9231' Perforation depth: measured 9422' -9550', 9576'-9594' true vertical 8815' -8938' , 8963' -8980' Tubing (size, grade and measured depth) 5½" 17# L-80 to 9025' with 4½" 12.6 # L-80 tubing tail Packers and SSSV (type and measured depth) Brown '3H' Packer set ~ 90~5': Otis RF)M %.~SV 0 2214' 12. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure to 9124' (?214'MD/ (8528')MD 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure NONE 3~)"T5 2735 136 340 Tubing Pressure 878 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 CHB (263-4643) Title Operations En.qineerin.q Manaqer Date Submit in Duplicate Began perforating operation 4/10/86. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 9441'-9445'MD (4 spf), flow well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #2, shJot interval 9431'-9441'MD (4 spf), flowed well to clean up. Shut-in well, POON, all shots fired. RIH with gun #3, shot interval 9575'-9593'MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #4, shot interval 9525'-95~r~'MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. Shut-in well, POOH, all shots fired. RIH with: gun #5, shot interval 9505'-9525'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #6, shot interval 9480'-9505'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #7, shot interval 9455'-9480'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #8, shot interval 9421'-9431' and 9445'-9455'MD (4 spf) flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. REF: CBL 2/27/86 ~.-~l-.,C(..'l A I.a.'..~'ka, I::',Ok Box t00360 A'nchorage, ALaska 99.5t0 DAI'E:' Augus't' D, t986 t --. 4 4 --9 -.. 86 ~-;~ t: a t.. i c G.. r a d i e in t' f:'...a mt.:: o t - t t 4 --'7 -.- 8-6 .~.~ t.- a f i c G r ;.~ d i e n '~ C ,.'~ m (:: o t -- t 6 4 .... t 0.--86 ,9 t: a t;. i c 15 r a d i e n t;. C a m (." o 3-t 6 6-2G-86 I.~'r'e.s'..;'ure Fa I.I. off' ~".' '..5 .... ~ t 7.-- ,.. '~ -- -':.~., ,.,z F !. o w i iq g I; r a cli e r'~ "c C.. a m c: o ,...'~' - 3 .,_") '? -- 2 - ,~36 F I. o t,,~ i in .9 I'];. r a d i e n 4' r'.. a m c o 3-34 7-.-4-86 F'" Low i rig(}r'~d i enf C~.~mc.:o t6-7 7-.-.25-86 ~;t;. a 1.' i c Gr@d i en't .C~mco I::'l. ea~;e sigri anti tel'tim 1'he at"t'a(::hed (.-.Ol:)y a.s receipt' of d,'.~'ta, I, :.: _ ~-:: iBy ...................... .. __ HAVE A N!CI:-" iDAY] I... inda I~ Alaska Oil & aas Co,is. Commission A '¥ 0 - t 5:'2 ,:-', Anchorage T I'-( A N S' ...,q z a o w. i) I ,? 'f' I:;.'. I B tJ T ]] C! N C e n-.1: r a I. !::' i I. e '.-.." C h e v r o n .Il. ,,. I) & M E x t; e r, s i o n E x p l. c,i- a .I; i c', i'i · "' F...'. x x o n '1:1' . :',':He, bi L ARCO Alasi<a, Inc P.O. Box Anchorage, Alaska 995 ~ ~ DATE' July ~ 6, t986 REFERENCE' ARCO Cased Hole Final 3-2 7-2-86 3-9 6-23-86 3-~6 6-20-86 3-3t ~ 7-2-86 3-32 7-3/4-86 3-3J 7-4-86 5-54 7-4/5-86 -.~0/~1 -86 ~ 2-27 6 o o ~4-5 7-6-86 Prod profile Run J 5" Camco GR[og Run ~ 5' Camco Injection/temp Run ~ 5' Camco Prod prof~ [e Run ~ 5' Camco F'rod profi [e Run i 5' Camco Prod profi[e Run t 5' Camco Prod profi [e Run i 5' Camco Injec~ion/~emp Run i 5' Camco X-Y Caliper Log Run ~ 5" Camco Please sign and re~ Received By_ HAVE A NICE DAY! L. inda Hu£c ATO-1527 TRAN$ $8~ led cop ce i ta. DISTRIBUTION Central Fi [e~ Chevl-or~ D&M Ex~en_~ion Exp[ora+.ion Exxon Marathon Mob i [ Phi[[ip~ F'B We[[ Fi les R & D $oh i o State of Ataska Texaco DATE' .!::~,:,~ i'.2 : i786 ARCO C~_..:'--~d HO J e r , ..::.='. ~ ! :%T$i 2 .* ":,,-', c:.. ,' 3-3i -.-.f-. i 7-86 7-3;4 i¥-ma CarLi'n A-.:-O- ~ _-27 'r RAN-i; %86342 '-'_ ~'~' STATE OF ALASKA ALASKA ulL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~( GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-97 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21132 4. Location of well at surface 9. Unit or Lease Name 97' FSL, 846' FWL, Sec.ll, TION, R15E, UM Prudhoe Bay Unit 10. Well Number At Top Producing Interval 2458' FNL, 20' FEL, Sec.15, T10N, R15E, UM 3-34 At Total Depth 11. Field and Pool 2570' FNL, 96' FEL, Sec.15, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 62' RKB ADL 28332 ALK 2328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 07/13/84 07/25/84 07/26/84*I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 9860'MD,9231 'TVD 9823 'MD ,9197 'TVD YESJ)~] NO [] 2214 feet MDJ 1900' (Approx) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, LDT/CNL/Cal/GR, CBL/GR/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED zu;; ~-i .b~ H-~U 5ur~ 110 ' 30" 1865# Pol eset 13-3/8" 72.0# L-80 Surf 2501' 17-1/2" 2100 sx CS Ill & 200 sx (S II 9-5/8" 47.0# L-80 Surf 9324' 12-1/4" 500 sx Class G & 300 sx (S I 7" 29.0# L-80 9098' 9860' 8-1/2" 300 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9421' - 9549' 5-1/2" 9124' 9015' 9575' - 9593' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. Ref: CBL 2/27/86 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED : N/A 27 ...... '----~ PRODUCTION TEST ,~Date First Proc~ction Method of Operation (Flowing, gas liftl etc.) 4/1 2/86 / F1 owing )fT' ..... Hours Tested pRODUCTION FOR OIL-BBL GASJMCF WATERoBBL CHOKE SIZE GAS-OIL RATIO 2/86 6.1 TEST pERIOD I~ 994 684 34 40 688 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 878 340 24-HOUR RATE j~ 3975 2735 136 26.8 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE RECEIVED JUN 1 3 1986 .. ~,laska 0il & Gas Cons. ~,,,,'" ....... - Anchorage Form 10-407 NOTE: Tubing was run 2/28/86._.~..~ WC1/038 Rev. 7-1-80 ,,. ...... '-~-~ONTINUED ON REVERSE SIDE _ Submit in duplicate 29. . .. ~ ~:,~.~ 30. :.. GEOLOGIc MARKERS ' . ' . .' ........ FORMATIQNTESTS · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. " · Top Sad] erochi t 9z, 22 T 8815 ~ N/A .. HOT 9670 ~ 9053 ~ 0WC 9715 ~ 90967 . 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,(~"~/~,,./ .;~,)..L~]~ Title Associate Engineer Date (~"/0-'~ .. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut:in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO ALa-~:ka, Inc. Anchorage, Alaska DATE ' M.~- y ]"'-", 4, oo .-' ~.S-5 -I, ! ~3-32 j-34 ~T-i3 ~ "-.;'- 2 i-i3 ~ , ii 6-4 ~i6-iS AR'CO Press,are ":.,.)eta :*-¢'4--06 ~4'a+ lc: ,=~ au ~_-'~I -*-. ~- ' i e'ni ~ i~, S6 3~a~-i.c Grau · ~-6-86 Llt.~*ic Grad ien* 4-9-6:6 Si'a*~ c graa,,ienl n-?i-86 Statlc Gradi 4-i 6-86 "ratio Gradic-nt 4-24-86 =~*~ ~*~ ic ~-~ ~. ~a, ic ~r.ad 4-27-86 ~tatic Gradient '*-26-86 ~'* +~ -' d i ..... , ....... a, ~c Grad;ent 5-i9-66 Fiowing Orad lent 4-26-86 Static ~,,-a,: 4-26-86 ::'t a i- ~ c .~, a d i 4-c'~-° z- Sta*ic -'- ~'- _ . -'-i -- HAVE C ~TC~ nAY, A i U-i bY-'_== C:hevror:. ::? ~e :._ '-L F; Lez = '-=" & H ~ :' ' ~ "-~' STATE OF ALASKA '~'-' /¢/ ~. ALASKA u~L AND GAS CONSERVATION C~J,wMISSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well Ex OIt GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-97 3. Address 8. APl Number 029-21132 P. 0. Box 100360, Anchorage, AK 99510 50- 4. Location of well at surface --~OCATIONS 9. UnitprudhoeOr LeaSeBayNameuni t 97' FSL, 846' FWL, Sec.11, T10N, R15E, UM VEMFIED At Top Producing Interval SurJ:.~ 10. Well Number 2458' FNL, 20' FEL, Sec.15, T10N, R15E, UM 3-34 H. ~1 11. Field and Pool At Total Depth 2570' FNL, 96' FEL, Sec.15, T10N, R15E, UM Prudhoe Bay Field Prudhoe Bay 0il Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 62' RKB ADL 28:3:32 ALK 2:328 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No. of Completions 07/1:3/84 07/25/84 07/26/84* N/A feet MSL 1 I I 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 9860'MD,9231 'TVD 982:3 'MD ,9197 'TVD YES [~X NO [] 2214 feet MD 1900' (Approx) I 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR, LDT/CNL/Cal/GR, CBL/GR/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED zu" t~l ..b# H-4U Surt ] 1U' :¢U" 1 U65# Po I eset 1:3-:3/8" 72.0# L-80 Surf 2501' 17-1/2" 2100 sx CS Ill & 200 sx CS II 9-5/8" 47.0# L-80 Surf 9324' 12-1/4" 500 sx Class G & 300 sx CS I 7" 29.0# L-80 9098' 9860' 8-1/2" :300 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 5-1/2" 91 24 ' 9015 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ I . OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Flow Tubing Casing Pressure CALCULATED Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE · ,, Form 10-407 Rev. 7-1-80 NOTE: Tubing was run 2/28/86. DAM2/WC35 CONTINUED ON REVERSE SIDE Submit in duplicate ~*' ~ ' GEOLOG1CMAR-KERS . NAME ....... I~clude interval tested, pressure data, all fluids recovered and gravitY,- ' 'MEAS. DEPTH" TRUE VERT. DEPTH GOR, and time of each phase. . . Top Sad] erochi~ 9~22~ 8815~ N/A , , .~ -~'. .~'. .... HOT 9670 ~ 905~ ~ 0~C 9Z15 ~ 9096 ~ - _ :':--__._' : : '.", ... .",..-... , ~'.;. ~?' : :. .'~ . .., .... . - .,¢ ~ '. . ;;.. :-~ :,. :¢:. .~ , .". ':; -. : ' -; .~. . -',, , . , . -, :-. .. .. 31. LIST OF ATTACHMENTS ~ei] History (coap]e~ion de~aiis)~ Gyroscopic Survey (2 cop~es) ...... .. ,. . . 32. I hereby certify:that the foregoing is true and correct to the best of my knowledge ..: · /. :-- - 7. .- . , INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. ' Prudhoe Bay ~,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 3, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-34 Permit No. 84-97 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/BjN-jj Enclosure cc: SOHIO Alaska Petroleum Co. Pile PI(DS 3-34)W1-3 RECEIVED APRO 4 1986 Alaska Oil & Gas Cons. Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ALA,~ OIL AND GAS CONSERVATION COM $SION APPLICATION FOR SUNDRY APPROV ; m88 1. Type of Request: Abandon -- Suspend ~ Operation Shutdown - Re-enter suspende~ ¢|1 Chang~ approved program ~ Plugging Z Stimulate- Pull tubing-- Amend order ~ P~Cil~~'Other- h Time extension 2. Name of Operator ARCO Alaska, Inc. . Address Post Office Box 100360, Anchorage, AK 99510 Location of well at surface 846' FWL, 97' FSL, Sec. 11, TiON, R15E, UM 5. Datum elevation (DF or KB) 62' KB 6. Unit or Prope,,rty Prudhoe ~ay ~}a~e 7. Well number DS 3-34 At top of productive interval Gyro not available At effective depth At total depth 8. Permit number 84-97 9. APl number 50-- 02921132 10. Pool Prudhoe Bay Oil Pool feet 11. Present well condition summary Total depth: measured true vertical 9860 feet Plugs (measured) N/A feet Effective depth: measured true vertical 9822 feet Junk (measured) N/A feet Casing Structural Conductor 110 Surface 2501 Intermediate ' Production 9324 Liner 779 Length Perforation depth: measuredcroposed: Size Cemented Measured depth True Vertical depth 2O 110 N/A 13-3/8 2300 sx 2501 N/A 9-5/8 500 sx 9324 N/A 7 300 sx 9860 N/A 9422-9550~ 9576-9594 true vertical N/A 5-1/2" 17 # L80 to 9025 with 4-1/2" 12.6 #L-80 tubing tail to 9124 Tubing (size, grade and measured depth) Brown '3H' Packer set @9015, Otis RQM SSSV @2214 Packers and SSSV (type and measured depth) 12.Attachments Description summary of proposal,,~ Detailed operations program '_~ BOP sketch 13. Estimated date for commencing operation April 5, 1986 14. If proposal was verbally approved Name of approver Date approved 15.1 herebDcertify th~,t~ Signed ~)C, c~~ the foregoing is true and correct to the best of my knowledge Commission Use Only Date ~/~/¢~ Conditions of approval Notify commission so representative may witness .-- Plug integrity -- BOP Test - Location clearance Commissioner Approved by IApproval No. / the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate ARCO Alaska, Inc. proposes to perforate DS 3-34 at selected intervals within the Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be flowed for clean-up. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Ref- BHCS 07-24-84 9422-9550' Zulu 9576-9594' Zulu RECEIVED APRO 1986 Alaska 011 & Gas Cons. Commission AnchoraD8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~ 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 84-97 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21132 4. Location of Well Surface; 97' FSL, 846' FWL, Sec.11, TION, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 62 ' 12. I6. Lease Designation and Serial No. ADL 28332 ALK 2328 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3-34 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data OTHER [] NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Accepted rig ~ 1430 hfs, 02/21/86. ND tree. NU BOPE & tstd to 5000 psi - ok. Broke through ice plug @ 350 - circ. hot brine. Drld soft cmt f/9024' - 9073' (TOL ~ 9082'). Drld & washed soft cmt to 9623'. Drld firi cmt to 9632'. Tstd 7" liner lap & 9-5/8" csg ~ 9652' to 3000 psi - ok. Drld cmt to 9813'. Tstd 7" liner 11 & 7" & 9-5/8" csg - ok. Ran CBL/GR/CCL. Ran Gyro. Ran 4-1/2" tailpipe & 5-1/2" completion assembly. Displ tubing w/diesel. Dropped ball & set pkr. Tstd tubing - ok. Set BPV. ND BOPE. NU tree & tstd to 5000 psi ok. Secured well & released rig @ 1645 hrs, 02/28/86. RECEI /ED APRO 1986 Alaska Oil & Gas t,;ur~, dommisslon 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~ ~/A~/L~ Title Associ ate Engi neet The space beloW/for Commission use Date Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 GRU14/SN03 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate :ARCO 0il and Gas Company Well History - Initial Report - Daily Inetructiona: Prepare and submit the "lniUel Report" on the first Wednesday after a well is spudded or workover operations are started, Dally work prior to spudding should be summarized on the form giving inclusive dates only. District Alaska Field ICounty, parish or borough North Slope Borough Lease or Unit ~]:)L 28327 Title Completion Prudhoe Bay Auth. or W.O. no. AFE 304107 State Alaska [We,,:~o_:34 WWS #1 API 50-029-21132 Operator ARCO Alaska, Inc. Spudded or W.O. begun IOate IHour cOmplete 2/21/86 1430 Hrs. Complete record for each day reported ARCO w.I. · 21 66% IPrior status if a W.O. Date and depth as of 8:00 a.m. 2/21/86 thru 2/24/86 2/25/86 2/26/86 2/27/86 2/28/86 7" f/9081'-9860' 9081' TOL, PU 6" BHA Wt. 9.6, PV 14, YP 6, PH 10.5, WL 13.8, So1 -- Accept rig @ 1430 hrs, 2/21/86. Set BPV. ND tree, NU &tst BOPE to 5000 psi. RIH on 3½" DP, wsh & rm brine ice plug @ 3 BPM w/8½" bit f/72'-350', broke thru ice plug. Circ hot brine @ 350'. Cont TIH, displ brine w/mud, C&C mud @ 7000'. Cont RIH, PU 3½" DP, drl soft cmt f/9024'-9073'. C&C mud, observe well; OK. POOH, LD BHA. PU BHA. 7" f/9081'-9860' 9722' DPM, Drl on wiper plug & LC @ 9722' Wt. 9.5, PV 17, YP 13, PH 11.0, WL 13.4, Sol -- RIH, tag TOL @ 9073', drl soft cmt f/9075'-9115', wsh soft cmt to 9122', break thru soft cmt @ 9122'. Cont RIH, drl soft cmt f/9615''9623', med cmt f/9623'-9630'. Tag & drl firm cmt f/9630'-9632'. Tst 7" lnr lap & 7" x 9-5/8" csg @ 9652' to 3000 psi. Drl firm cmt f/9652'-9722'. Drl on LC @ 9722'. 7" f/9081'-9860' 9822' PBTD, POOH, LD DP 9.0 ppg NaC1 Drl wiper plug & LC @ 9722'. Drl firm cmt f/9723'-9813', CBU, tst 7" lnr lap & 7" x 9-5/8" csg & cmt to 3000 psi. Rev circ 25 bbls hi-vis sweep, followed by 755 bbls brine. Balance fluid sys. M&P 35 bbls vis pill dn DP in 7" lnr, followed by 53 bbls brine, POOH, LD DP. 7" f/9081'-9860' 9822' PBTD, Prep to rn tbg 9.0 ppg NaC1 POOH, LD 3½" DP. RU WL, rn CBL/GR/CCL f/9797'-8962', RD WL. Rn gyro. Tst 5½" pipe rams to 5000 psi. Prep to PU 4½" tailpipe assy. 7" f/9081'-9860' 9822' PBTD, Set pkr Diesel RIH w/4½" tailpipe & 5½" tbg. Displ brine in tbg & ann w/diesel. Lnd tbg. Pmp 50 bbls diesel dn tbg. Drop ball to set pkr. Th~va~ove is correct ~irgna~re ~', __~ . // For form~paration ~;~ distribution, see ProILtlarures Manual, Section 10, Drilling, Pages 86 and 87. Date 3/13/86 ]Title Drilling Superintendent AtlanticRichfieldCompanY '~' Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final ReicH" form may be used for reporting the entire operation il space is available. District IC°unty or Parish I Alaska Field Ihease or Unit I Prudhoe Bay Auth. or W.O. no. ~TItle I AFE 304107 North Slope Borough ADL 28327 Accounting cost center code State Alaska JWell no, 3-34 Completion WWS #1 Operator ARCO Alaska, Inc. API 50-029-21132 A.R.Co. W.I. 21.66% Spudded or W.O. begun Date Complete 2 / 21/86 Date and depth Complete record for each day reported as Of 8:00 a.m. Old TD 1645 Hrs. Iotal number of wells (active or inactive) on this~ Dst center prior to plugging and I bandonment of this well our I Prior status if a W.O. I 1430 Hrs. 3/01/86 Released rig 7" f/9081'-9860' 9822' PBTD, RR Diesel Set pkr, shear PBR, re-lnd tbg. Tst tbg & ann; OK. Set BPV. ND BOPE, NU & tst tree to 5000 psi. RR @ 1645 hfs, 2/28/86. (NOTE: Rn 212 its, 5½" 8RD & 2 its, 4½" BTC tbg w/SSSV @ 2214', 3H Perm pkr @ 9015', TT @ 9124') New TD Date I PB Depth 9822 ' Kind ?f rig Rotary 2/28/86 Classifications (o11, gas, etc.) Oil Producing method Flowing Type completion (single, dual, etc.) Single Official reservoir name(s) Sadlerochit Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected ~ove is correct see Proc~-dures Manual, Section 10, I Date ]Title ~,,'Jl ¢.,~&., 3/13/86 Drilling, Pages 86 and 87. Drilling Superintendent ..... STATE OF ALASKA '--'-, V-' ALASKA O,~ AND GAS CONSERVATION COk,MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [] Workover operationXIX] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-97 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21132 9. Unit or Lease Name Prudhoe Bay Unit 4. Location of Well atsurface 97' FSL, 846' FWL, Sec.11, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 62' RKB ADL 28332 ALK 2328 10. Well No. 3 -34 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool For the Month of. February , 19 86 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig ~ 1430 hfs, 02/21/86. ND tree. NU BOPE & tstd. Displaced brine w/mud. 9813'. Ran logs. Ran 5-1/2" completion assmebly. Displaced well w/diesel. ND BOPE. Secured well & RR ~ 1645 hrs, 02/28/86. Drld cmt f/9024' - NU tree & tstd. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 5-1/2" 17.0#/ft L-80 IPC tbg w/tail ¢ 9124', SSSV ~ 2214', 3-H pkr ¢ 9015' , , , · 14. Coring resume and brief description None 15. Logs run and depth where run CBL/GR/CCL f/9797' - 8962' Gyro - depths not available 6. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ ~ Associate Engineer SIGNED TITLE DATE NOTE--Repo~ on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Submit in duplicate prudhoe Bay ' ~ 304107 Rowan ~35 AP! 50-029-21132 North Slope Boroush ADL ~t28332 Drill, Complete & Perforate ARCO Alaska, Inc. 0200 Hfs Alaska 3-34 21 66I IP~or Miit~ If · W.O. Spudded 7/13184 7/14/84 thru 7/16/84 7/17/84 7/18/84 -~. I -- 7/19/84 TI~ m is (IM'ml~ 20" @ IlO' 480' (383 ' ) , TOH WC 8.7, PV 22, YP 48, PR 8.5, VL 14, Sol 3 Accept Ri~ @ 2100 hfs, 7/12/8&. gU diverCer eye. Spud veil @ 0200 hfs, 7/13/8&. Drl 17-1/2" hole to 480', POH f/new bit. 13-3/8" @ 2501' 3696', (3215'), PU BHA VC 9.1, PV 5, YP 8, PR 9.5, ~rL NC, Sol 6 Drl 17½" hole co 2530'. RU & rn 6& Jcs, 13-3/8", 72~, L-80 BTC csg & w/FS @ 2501', FC @ 2420'. Cmo v/2100 sx CS III, followed by 200 sx CS II. Displ usin~ ri~ ~, b~p plug. Perfo~ cop lob ~/200 sx CS II ~ 15.0 ppg. ~ & cst BOPE. RI~ ~/B~, DO FC, cmc, FS + cmo Co 2658'. Co,ucc ~ Cs~ to 11.2 pp~ ~; O~. TIH, drl & su~ 12%" holm ~o 3696'. 2658', ~8~ed vertical 3003', 8-3/~°, S3W, 3001 ~, 30.94 VS, 32.7S, 1.71E 3647', 26-1/4~, S~, 3615 ~, 215.12 rS, 219.29S, 17.91W 13-3/8" @ 2501' 5661', (1964'), Drl$ ahead WC 9.5, PV 4, YP 9, PH 8.0, WL NC, Sol 8 Drl & surv 12~ hole Co 5661'. 4139', 25-3/&', SI1V, 4061 TVD, 421 VS, 424S, 53W 4636', 26-3/4', $11V, 4506 TVD, 640 VS, 640S, 95W 5072', 27-1/&', S16g, 4895 TV'D, 837 VS, 833S, 141W 13-3/8" @ 2501' 6675', (1014'), Surv'$ VC 9.5, PV 5, YP 19, Pit 8.0, W'L NC, Sol 8 Drl & surv 12~" hole co 6675'. 5631', 27', S20V, 5392.42 TVD, 1092.27,1075.019, 219.70W, 6067', 27-1/2°, $22V, 5780.03 TVD, 1291.41, 1261.388, 291.24V 6594', 28', S24V, 6246.42 TI;D, 1535.45, 1487.25S, 387.11W 13-3/8" @ 2501' 7445', (770'), Drl$ WC 9.6, ?V 5, YP 11, PB 8.0, VL 26 Sol 9 Drl & surv 12¼" hole Co 7445'. Drillin8 Superintendent ARCO 011 and Gas Company Dally Wall History--Interim Alaska ILem o, Unit North Slope Borough I ADL #28332 Complete record for elch day while drilling Or workover in progre# Prudhoe Bay 7120/84 Field 7121184 thru 7/23/84 Oate and depth aa of 8:00 a.m. 7/24/84 7/25/84 7/26/84 =--' 13-3/8" @ 2501' 7970', (525'), Drlg Wt 9.7, PV 10, YP 9, PH 8.0, W-L --, Sol 10 Drl & surv 12¼" hole to 7970'. 7538', 27-1/2°, S21W, 7080 Tv'D, /977 VS, 1897S, 557W 13-3/8" @ 2501' 9336', (1366'), Rn'g 9-5/8" csg Wt 9.9, PV 13, YP 7, PH 8.0, WL 9, Sol 11.5 Drl & surv 12¼" hole to 9336', 20 std short trip, CBU, TOH. top rams to 9-5/8", cst to 5000 psi. RU & begin rn'g 9-5/8", 47#, L-80 BTC csg. 8106', 25-3/4°, S22W, 7587 TVD, 2134S, 650W, 2231VS 8600', 23-1/4°, S24W, 8037 TVD, 2323S, 730W, 2435 VS 9256', 16°, S38W, 8730 TVD, 2534S, 857W, 2676 VS 9-5/8" @ 9324' 9435', (99'), Drlg Wt 9.7, PV 14, YP 10, PH 9.5, WL 8, Sol 11 Fin rn'g 240 Jts, 9-5/8", 47#, L-80 BTC & lnd w/FS @ 9324' RKB. Cmo w/500 sx C1 "G" w/.15% R-5 & .75% D-31. Displ using rig pmp, bump plug. CIP @ 1215 hfs, 7/23/84. Chg rams to 5" & tst to 5000 psi. RIH w/8½" BHA, DO cmt, FC, FS + 10' new hole to 9346'. Conduct formation cst to 11.2 ppg EMW. Drl 8½" hole to 9435'. 9-5/8" @ 9324' 9823', (0'), Drlg rathole Wt 9.7, PV 13, YP 5, PH 9.5, WL 7, Sol 11 Drl to 9823'. RU & rn DIL/SP/BHCS/GR f/9815'-9314'. LDT/CNL/CAL/GR f/9810'-9314' (fin GR f/9314'-2000'). bit to TD & dri rat hole. mn R~H w/8½" Alaska Well no. 3-34 Chg 7" @ 9860' 9860', (37'), POOH, LD DP 9.5 ppg NeC1 (top 2000' 9-5/8" csg) Drl 8½" hole to 9860', cond f/lnr. RU & rn 17 its, 7", 29#, BTC csg to 9860'. M&P 300 sx C1 "G" w/5% KC1, .5% D-31, 1.2% D-19, .05% R-5 & .2% D-6. Displ using rig pmps, bump plug. LC @ 9732', FC @ 9822', FS @ 9860'. POH, LD DP, displ top 2000' to 9.5 NEC1. TI'Il IbOVt Il correct m Procldufll Ml~ul/ S~ctlo(~ 10. Drilling, Plge~ B~ lad 67 Date I Tille 8/07/84 ARCO OII and Ga~ Company Dally Well HMtorf--lnterlm OII~HCt Field Oate end (~e13~ ........ .r a~ of 6:00 ~.m. 7/27/84 LeaMorUnlt ' - ADT. ~?R~9 Complete record for e~h day Mile drilling or workout in pr~rese lStill A~a~k~ JWell no. 3-34 The 8t~oyo it correct For form I=rel~relloh Ifld dletrtbulion ~ Procedum~ MMluM SM~tiM~ 10, Drilling, Page. ~ ao4 O? 7" @ 9860' 9860', (0'), RR 9.7 ppg NaC1 (top 2000' 9-5/8" cs$ w/100' diesel cap) Fin POH & LD DP. Fill Cop 100' w/diesel, lnd cbg. N~ BOPE, NU & cst tree to 5000 psi. Operations suspended - wait on completion rig. RR @ 1200 hfs, 7/26/84. 7", 29#, L-80 BTC cs$ FS @ 9860' - FC @ 9823' - LC @ 9732.88' ITitle ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 21, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT' DS 3-34 Dear Mr. Chatterton' Enclosed is a Sundry Notice for DS 3-34. We propose to complete this well and run a 5-1/2" tubing string with gas lift mandrels. We will be utilizing a completion rig for this work. We expect to start this work on November 21, 1985. If you have any questions, please call me at 263-4944 or Eric Witten at 263-4968. Sincerely, d. Gruber Associate Engineer JG/EBW/tw SN/L065 Enclosure RECEIVED ,~t, orag~ C°mrnission ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA "-" ALASKA (J,L AND GAS CONSERVATION CO,v, MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WE LLXK-I OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P, 0, Box 100360, Anchorage_. AK 99510 4. Location of Well Surface: 97' FSL, 846' FWL, Sec.ll, TION, R15E, UN 5. Elevation in feet (indicate KB, DF, etc.) RKB 62' I 6. Lease Designation and Serial No. ADL 28327 ALK 2325 7. Permit No. 84-97 8. APl Number 50- 029-21132 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3-34 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other I~X Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee20 AAC 25.105-170). ARCO Alaska, Inc., proposes to complete this well. A completion rig will be utilized for this work. A 5-1/2" tubing string with gas lift mandrels will be run. A subsequent sundry will be submitted following this workover outlining the completion details. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. The BOP equipment will be tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested UpOn conclusion of the job. Estimated Start: November 15, 1985 RECE!VE'D A!aSka ~hi & G;.~$ Crj[~S' C0;';I/rJJssl0n 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below Commission use Title Associate Engineer Date Conditions of Approval, if any: Approved by ORIGINAL SIGNED Approved l~eturned By Order of /~_~_ ~. d~-5 COMMISSIONER the Commission Date .... Form 10-403 Rev. 7-1-80 (JC) SN/094 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ALASKA OIL A#D ~A$ g,O#$EflYATlO#.~,Offffffl$$10# / ~::.' soot i~Ol~CUPIHl~ DfllVE ' ;':~' AHCHORA(;IE,ALASI~A gOffOl&~llOl ~ '~'TELEI?.tlOHEIOOII 17grl43] Fermit: 1~o._' tf3;rq '" ',~' 7 '. We w~h to bring to yoar attention tha~ the Commfss~on has hoe yet received the following required ftems on the subject well'. ~hlch our records indicated .as completed ~77-~.~-~.2/ o. Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 days after completion of a drilled.well. Please submit the' above missing material. .. · Chairman lc~0.024 ALASJ~A OIL AND ~A$ CONS[RYATION-~OM~IS$10N Bill Sheffield, Go~,ernor 300! PORCUPINE DRIVE ANCHORAGE,ALAOKA ggg01.1-3f g2 TELEPHONE(gO/) 21g,-.t433 DATE: ~ TO: C ' - " - · Permit No. ~ -- We wish to bring to your attention that the Commission has no~'~ yet received the following required items on the su~bJect.well which our records indicated was completed ~7-~'-_~,~ - / Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 after completion of a drilled-well. Please submit the above missing m. aterial. Chairman lc.. C. 024 days ARCO Nask , ~ 100360 _ post Office ' A. ncho~age' Atast~a 99510 Te%ephone 90'/2?6 1215 january ~6, ~985 Mr. C. ~- ChattertOn . missioner Con. ^~ ~laSka ~_~rvation Stat? uk~1 & GaS bu"°~ ~lasKa u. Commission · 3001 porCUpine ~nchOrage, ~K 99501 SUBJEC%: Well CompletiOn ReportS Dear ~r. chattertOn' ~eportS for the follOWing wellS: Enclosed are the Well Completion BS 3-33 be submitted DS 3-34 .. _ details w~llcompleted' . aad tu~?~,d the wellS loca~,~'i~ ~ rye, s ~- 263-4944' BottomhOl e gyroscOp' ~ ~u at after the please call If you have any questionS, Sincerely ' · GrUb~e Engineer AssOCia jG/tw EnclosureS RECEIVED JAN 1 8 ]985 Alaska Oil & Gas Cons. Commission Anchorage · a Subs%dia[¥ ot At%anticRichtteldC°mpa~¥ ARCO Atast(a, thc, ts STATE OF ALASKA ALASKA ~. .AND GAS CONSERVATION CC ilSSION 0 WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [~ ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc, 84-97 3. Address 8. APl Number P, 0. Box 100360, Anchorage, AK 99510 50- 029-21132 4. Location of well at surface 9. Unit or Lease Name 97' FSL, 846' FWL, Sec.11, T10N, R15E, UN Prudhoe Bay Unit ,. At Top Producing Interval 10. Well Number To be submitted after gyro is run. 3-34 At Total Depth 11. Field and Pool To be submitted after gyro is run. Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and'Serial No. Prudhoe Bay Oi 1 Pool 62' RKB ADL 28332 ALK 2328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 07/13/84 07/25/84 07/26/84 N/A feet MSL N/A 17. Total Depth (MD+TVD) 9860' MD 18. Plug Back Depth (MD+TVD) 9823' MD YES19' Directional Survey[] NO [~X I 20. Depth where SSSV setN/A feet MD [ 21. Thickness of Permafrost1900, (Approx) 22. Type Electric or Other Logs Run D I L/SP/BHCS/GR, LDT/CNL/Cal/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING sIzE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 110' 30" 1865# Pol eset 13-3/8" 72.0# L-80 Surf 2501' 17-1/2" 2100 sx CS Ill & 200 sx CS II 9-5/8" 47.0# L-80 Surf 9324' 12-1/4" 500 sx Class "G" 7" 29.0# L-80 9098' 9860' 8-1/2" 300 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 2~. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS~MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD ]~ ,, Flow TUbing Casing Pressure CALCULATED OIL~BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE J~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONE 1 ]985 Alaska Oil & Gas Cons. C0rnmJssJ0n Anchorage Form 10-407 JMM/~C30~. Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. '-~=:~' - 30.. '--. ' . i ; ..... :: ' - ' -' ':- :: :: ~: ,:..i':.: : ::FOR'MATION"TE~TS . . : . GEOLOGiC MARKERS .... .. NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. To be submitted af :er gyro is run. N/A 31. LIST OF ATTACHMENTS Well Hi story 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ y~, Associate Engineer ]_/._~c~:~ Signed ~/')%'0~.? . ~-~~ Title Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". April 4, 1986 Mr. Randy Ruedrich ARCO Alaska, Inc. P. O. Box 360 Anchorage, Alaska 99510 Re: Our Boss Gyroscopic Survey Job No. AK-BO-60013 Well: DS 3-34 Field: Prudhoe Bay Alaska Survey Date: February 26, 1986 Operator: J. Samec Mr. Ruedrich: Please find enclosed the "Original" and one (1) copy of our · Boss Gyroscopic Survey on the above well. Please note that a magnetic tape of the survey will be sent to Standard AK Prod. Co. as per request of Jo Ann Gruber. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard District Manager Enclosures NL Sperry-,,~n/NL Industries, Inc. P.O. Box 190207, Anchorage, Alaska 99519-0207, Tel. (907) 522-1737 SPERRY-SUN WELL SURVEYING COMPANY ARCO ALASKA, INC. DS 3-34 PRUDHOE BAY ~i~~ ALASKA """' "~"~ "" 'i~:' TRUE ~JB-SEA MEASURED VERT I C~- I~PTH DEPTH ' ~"i~::: :,::..:<.,~.~:~ COURSE INCLINATION ' M ! N 0 OZ ~-00 -62. O0 1 O0 100. O0 38. O0 200 200. O0 138. O0 ':. :'4~0 ': ;400. 00' 338,00 · 600 ....... ~.~'~. 9'8 '" 537', ~8 700 699.98 637.98 800 799.97 737.97 1-200-- ' 1'199.9~' .... 1137.95 1300 1299.95 1237.95 1400 1399.95 1337.95 PAGE I ANCHORAGE ALASKA COMPUTATION DATE DATE OF SURVEY FEBRUARY 26, 1986 BOSS GYROSCOPIC SUR~E¥ ~... JOB NUMBER KELLY op.. ERATOR. -d, i: S~~ - FEBRUARY 28, 1986 O0 FT. COURSE DOG-LEG TOTAL ':';'~4,j'~i.'.-'' RECTANGULAR CO~DINA~~RTICAL NORTH/SOUTH :.:i£~ST:i~'~i~EcTI~ . .::~?.:::.... ?.?.:~~!..,-..... DIRECTION SEVERITY DEOREES DEO/1 O0 0 "0 ......... N---O=--O-E ............ 0 15 S 43.50 W 0.25 0 13 S 43.60 W 0.03 0''!4' $ 5!. O'W 0,04 0' "39 0 30 0 36 S 4~. 0 W · · S '1 ~:':',::69 W' . :.:O., 42 "'S' "5; 60' W 0';"22 S 21.50 W 0.21 S 43.10 W 0.23 , ,Wi 0 2t S. :'~.' 0 W.,...::,' 0---i7 ..... N 84' 30 W 0'.--~4 0 19 N 80, 19 W 0.04 0 6 N 61.80 W 0.22 o'. Oo o, oo 0.16 S 0.15 W 0.46 S 0.44 W O, 74 S O' 74 W 1.!5 S 1.1~ w 2.07 1,71 W 3.27 S 1":'~9 'W 4.25 S 2.21 W 5. O6 S 2.74 W O. O0 O. 20 O. 58 O. 94 1,48 2,52 ' "":' ' :' ' "S: :i37 6.78 S 6.20 W 6.69 S 6.56 W 3.75 4.75 5.68 7. ~::.:j :: 8, 1:1 ::::: ;. 8.3~ '"'"" 8.46 8.49 1900 1899.94 1837.94 2000 1999.93 1937.93 2400 .......... 23,g9, 88 2337' 88 2500 2499.88 2437.88 2600 ' 25~9.87' 2537.87 2700-'~' 269~,72 2637 2800 : 27~, 2~ 2737" 0 0 43 4.89 1 21 4.26 1',,':60 S N 56. 0 E O. 73 N 76.89 E 0.73 i "':~' s 4.5o E',: '.:!;p. 40 s 15, 5o E 6.8~ w 6.47 W 4.78 W 2'~'~--I~ 1,45 W 1.08 W 1.36 1.27 O. 83 7.48 6.76 5.61 :4;20: 2.68 1.87 W W W O. 14 W 0.77 E 1.16 I . 75 73 48 6. ~8 15.39 26.07 SPERRY-SUN WELL SURVEYING COMPANY ARCO ALASKA, INC. DS 3-34 PRUDHOE BAY , . .. ,, ALASKA UERTICAL SECTION CALC~3J~LONG CLOSURE TRUE '~~A COURSE ~-MEASUR£O V~R~CAC .~~,.~C ~NCC~NATION ~EPTH O~P~H PAGE ANCHORAGE ALASKA COMPUTATION DATE FEBRUARY 28, 1986 DATE OF SURVEY FEBRUARY 26, 1986 BOSS GYROSCOPIC SU .1~¥. dOB NUMBER KELLY BU'SH'I'NG': ELE~ ~~~,~00 FT. OPERATOR-J: SA~C!!i .!' COURSE DOG-LEG DIRECTION SEVERITY RECTANGULAR ~ .,. ,~: ':,, · TOTAL C~RD I ~~!~!i~ER T I CAL NORTH/SOUTH · .'EAS'T ~~?.$ECT I ON . , .. ~'~;~'~!" . DEGREES DEG/IO0 3200 3193. 3400. 3383. 3500 347&' 3600 -----~5'F6-~, 3700 3660. 3100 309&.09 3034.09 10 47 51 3131.51 15 11 28 3227"28 18 ~!! ..... 71 3321.71 20 10 ~9. 3414.~9 22 3 O~ ..... ---~50-77.0~ 2-5 46 15 3598.15 25 0 3800 3750.85 3688.85 24 48 4000 39311.72' 38~,72 25 4~ 4100 4021.80 3959.80 25 42 3.60 W 6. OW ~-'-~:~o w 4.80W 6.10 W ~-,-~ w 7.89 W 9.89 W 10, 10 W 10'30 W 1.71 42.25 1.79 59.40 4.44 81.79 3' i-O 1i0.42 2.07 143.20 1 . 93 179.05 1.7~3 217.75 1.40 258.73 O. 87 300.33 O, ~7:. 342,02'S 0,55 38'4, 44 O* 10 427, 18 0.64 E 39.63 ...... 0.41W 58.15 2.37 W 77.92 4"59 W ~5'V'. &~ ....... 6'88 W 137,32 10.31W 172.27 14.52 W 210.16 19.64 W 250.51 26.15 W 291.90 40,68 W 376.05 48,37 W 418.91 4300 4201.66 4139.66 26 12 S 10. 60 W 4400 4291.18 4229.18 26 44 S 11.30 W 48'00 m 4648.19 458~ 26 51 S 13,80 W' 4900 4737.34 4675.34 27 0 S 14.69 W 5000 4826.45 4764.45 26 58 S 15.30 W 0.32 513.13 S O. 62 556.90 S , 0',' 50 0.44 777.11 S O. 27 820.96 S 56.34 W 461.'g~ 64.50 W 505.33 72.97 W 549.42 ~ ,'~-... ~2-~ 5~'~.--e, .~ ........... w ~e.e~ :', ., 110.98 W ............ -~-'~8.33 122.13 W 773.44 133.87 W 818.69 ,.,:::,,'.S~oo So'e4, z'..o ~o~' ~0 s i7.5o w i:ii?::::':::!~~34 '~o,~4 s ~?~. ~w ~4. o3 5500 5272. e2 5210 e2 2~ 40 s 19. 0 U ':,:...., .".'._,0,:54 ~ 03~. O~ s 200. e9 u 1043.7e s~oo s~. os SaGO. OS ~ se s 20. so w ' ...~..~,~;.,,r.,.., :,: '~'~;..74 1078.48 S 21 ~. 14 W 1088.91 , W ~'.~~ I~!""04 44-B-- :~l 5800 5539, 85 5477,85 27 31 $ ;22. 0 ":':~~ ' ' ~~~ ','~:~n . ";. , 5900 5628.57 5566,57 27 24 S 22,60 120&,46 S 266,95 W 1226,51 SPERRY-SUN WELL SURVEYING COMPANY PAGE ANCHORAGE ALASKA COMPUTATION DATE COURSE COURSE DOG-LEG M~A~UH~u VE~IICAL- i:.:i~i~SL INCI2INATION ' DIRECTION SEVERITY DEPTH DEPTH !'i~il DEe MIN DEGREES DEO/ 1 GO ARCO ALASKA, INC. DS 3-34 PA~JDHOE BAY ~:~!~:~:~%~::i'~ FEBRUARY 28 ALASKA ":'~:~'~:~ "~'":~' ~' . .,.~..~.~. ~~,.. · _. VERTICAL SECTION' 'CALC~ ' ~LoN~E~U~ TRUE DATE OF SURVEY FEBRUARY 26, 1986 BOSS GYROSCOPIC SUR~EY _ . .:~-.,-.~ :?~:..~, dOB NUMBER AK-B KELLY BUSHING EIJE~~i O0 FT. OPERATOR-d, . .... :~- TOTAL ~:,,,~;;~.,,, , RECTANGULAR COORD INeXpERT I CAL NORTH/SOUTH E~ST'/~~~ECT [ O.N 6000 57i7.3~ .... 5655.8~ --~7--'-1-7~'-~~;"I12-~ 6100 5806.15 5744.15 27 34 S 24. 0 W 6200 5894.71 5832.71 27 45 S 23.89 W 6.40.0 ~07! 27 600~'27 ~8 16 S 23 69 W 6600 .... 6700 6335.66 6800 6423.71 i..o0 6667. 7200 ' 677'5'~'65 ' '~7~'3,~"65' 7300 6863.92 6801 · 92 7400 6952.55 68~0.55 60~7,38 28 8 S 23,30 W 6273.66 28 8 S 22.69 W 6361.71 28 26 S 23. 0 W ....... ....... 27 46 S 20.69 W 27 24 S 20.39 W --0.30 "1248.7~' S '284~'83 0.47 1291.00 S 303.28 0.18 1333.44 S 322.13 0.28 ' 1376.20 S 341,08 0,27 141~.38 S 3~0.12 0,23 1462.73 S 378.~7 0;08 ...... ~i3-~'~-S 397.-~-~ 0.29 1549.60 S 416.11 0.32 1593.28 S 434.52 0;47. ' i?~<)'09"S 506;85 W 0.62 1812.92 S 523.77 W o. 40 ~05~. 2v s s4o. o3 w W W W W W 1272.37-~ 1310.32 1364.61 1411.'24 1458~2~ 1505,45 1552.59 1599.73 1647.05 ..... ~,,~.,~ ! 742,16 ! 78~. ";:.,.i 1836.90' ' 1883.87 1~30.18 O. 22 7900 7398.66 7336.66 26 22 S 20.50 W O. 21 8000 7488.48 7426.48 25 46 S 21.30 W 0.70 :766~'37 ': :::::7~07'3~J:: , 2~,,,.I. 19:W.' 0400')0'. 77851:7:&07~--'~':802 ' 7 ~8.42' .: 2S" 3 ~z' ~ ~:~c24'''' e 9~ N ::~~~ 019 0500 7943.70 7001.70 23 8 S 24.89 W 0600 '80~5.70 7~7S.78 22 46 S 25.10 W ;8700 806.6, 37 2134 $ 26. 8900 8315.46 8253'46 19 34 S 29.89 W 2026.15 S 2067.93 S 2108.99 S 2111.36 618.69 W 2155.94 634.37 W 2199.88 ~5'0. 15 W 2242, ~1 ~65.93 W 2205. !0 681.79 W 2326.40 2263.49 2299.52 2334.87 S 697.94 W 2366.72 S 714.39 W 2406.17 S 730.88 W 2445,00 S ' 747, 30 W ' :2402.50 2400, <~9 S ' 763" 84 W 2518.32 2431 · 28 S 700.36 W 25,52.30 ARCO ALASKA, INC. DS 3-34 PRUDHOE BAY ALASKA VERT I CAL SECT I ON'-c.~Lcu~ TRUE SPERRY-SUN WELL SURVEYING COMPANY PAGE 4 ~.~J~.,~ ONG CLOSURE ANCHORAGE ALASKA COMPUTATION DATE FEBRUARY 28, 198& dOB NUMBER AK-BO-&O.~ KELLY BUSH I NG E. LE:~ OPERATOR-J' COURSE COURSE DOG-LEG DATE OF SURVEY FEBRUARY 26, 1986 BOSS GYROSCOPIC SURV~E¥- ,- FT · TOTAL ~:" ,~ MEASU~----V~-RTICAL i~i'~ k~ ' ' ~' Il: '~I DEG MI N DEGREES ("DEPTH DEPTH ~-000 84~.g-~-~-----8-3--~7~ 98 18 33 S 30.80 W 9100 8505.17 8443.17 17 6 S 33.39 W 9200 8600. ~6 8538. ~6 16 14 S 36.30 W ::::::::::::::::::::::::::::: 87~3'80 8731.80 15 8 S 38. tO W ~oo ee~o. 1: ! 8828" 11 ~6 1 $ 36.39 W INCLINATION DIRECTION SEVERITY RECTANGULAR COORDIN~TJ .. , DEG/100 NORTH/SOUTH EAST~:..~ 9600 8986.08 8924.08 16 36 S 34.89 W 1.07 2459.47 S 796.86 W 2584.46 1.65 2485.40 S 813.10 W 2614.32 1.20 2508.95 S 829.47 W 2641.97 1,33 '-2530,38 S 845,83--~- 26&7-:~ 0.14 · 2550,82 8b:1,~8 W 2692.28 0,99 2572.22 8. 878,23 W 2717.87 0.72 2595.05 S 894.~0 W 2744.85 9700 9081.32 9019.32 18 49 S 33.60 W 2.24 2620.21 S 911.71 W 9750 9128.40 9066.40 20 31 S 32.60 W 3.47 2634.31 S 920.89 W ::~800 ......~1:75 ........ ~i'1'~"'23 20"-~ .... ~'~--~-:~-O-W 0','00 .... ' '264:~;:'0e ~0' ~3 ~860 9231 42 ~16~'42 20 3! S 32.60 W 0.00 2666"7~ S: ~4!.67 W ~/:jl_--'~[~~'% ..... ~~7--F~ET"'AT"'SO~T-~ I'~'-~E-G--~ 26 MiN~'-~T AT MD = 9860 2774.27 2790.62 2807.6~ 2828.17 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. · . SPERRY-SUN WELL SURVEYINO COMPANY PAGE ARCO ALASKA, DS 3-34 -PRUDHOE BAY ALASKA MEASURED PTH INC. ANCHORAGE ALASKA DATE OF SURVEY FEBRUARY · COMPUTATION DATE FEBRUARY 28, 1986 dOB NUMBER AK~BO~~!i~' i~i!~' KELLY BU~HING'ELE~, INT.E~.~TED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE' -~~A 'rOl'-A-[~ VERTICAL ~~~. RECTANGULAR COORDINATES MD-TVD DEPTH ~..~~H NORTH/SOUTH EAST/WEST DIFFERENCE 1986 O0 FT. 0 0. O0 -62. O0 1000 .ge)9. c26 c/37.96 2997.~ 59:' 2935, 5'9' 3.~3:1'72: 386~, 72 ' 5000 ....... 48'2~. 45~4764.45 6000 5717.39 5655.39 7000 659~. 57 6537.57 O. O0 O. O0 O. O0 6.49 s 4.36 w 0.04 ~,,26 S: 4.78 W 0.07 384' 44 S 40.68 6,8.28 820, 9',iS S I~*3'. 87 ~W 173.55 1248.79 S 284.83 W 282.61 1681.26 S 471.01 W 400.43 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL O. 04 0:,'03. :6S' 07 105.27 109.05 117.82 RADIUS OF CURVATURE METHOD. SPERRY-SUN WELL SURVEYING COMPANY PAGE ARCO ALASKA. INC. DS 3-34 PRUDHOE BAY ALASKA MFASUREO 'TH ANCHORAGE ALASKA COMPUTATION DATE FEBRUARY 28. 1986 INT£~~D VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH :~i~i~ '"' '~' A TRUE ~~ TOTAL VERTICAL ~ ~'~""'<L RECTANGULAR COORDINATES MO-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE DATE OF SURVEY FEBRUARY --~OB NUMBER AK"BO-~O~I'~ii:;~ KELLY BUSH I NG' ELE-V-;:!~ OPERATOR-J.SAMEC" ' '::i~: '.C.~ .,~! · . :,~., ,-, VERTICAL~ . · CO~ECT!ON 1986 FT. 0 0.00 62 62.00 i&2 -- 1~2.00 '262 2:62.00. 3~:= .' 3~.. OD 462 462,00 562 562.00 662 662.00 -62.00 0.00 00, O0 · 300':00 ~FO0. O0 500.00 600.00 962-oo 900'00 O. O0 O. O0 0.04 S 0.04 W ~-~ O, 33 'N o. ~4 s o. 62 w 0.94 s 0.97 w 1. ~--~' 1. b'~4-~ 2.85 S 1.95 W 3.94 S 2.09 W 5.55 S 3' 20 6, 33 S . 4,01 W 5.48 W 5.99 W 1062 1162 1262 1~'~,2 ' 1762 .... £0-~;2. 00'--1-0-00-5D-0-- ....................... -~.7~ 1162.00 1100.00 6.87 S 1262. O0 1200. O0 6.82 S ~.--7'2-S, 1-662. O0------i' 600~. '00 1762. O0 1700. O0 5.70 S '6.69' W 6.82 W O. O0 O. O0 O. O0 O. O0 ~3.01 O. 02 O. 02 0.03 O. 03 O. 04 O. 04 O. 05 0;05 O. 05 O. O0 o' oo o~00 .,0.. O0 ...... O. O0 0.01 0.01 GO 0~,'o~ Oi O. O0 O. O0 O. O0 0'.:; '00 ~'00 o;"oo O. O0 SPERRY-SUN WELL SURVEYING COMPANY ,:. PAGE ARCO ALASKA, DS 3-34 INC. ANCHORAGE ALASKA COMPUTATION DATE FEBRUARY 28, 1986 DATE OF SURVEY FEBRUARY 26, 1986 dOB, NUmaR ~,BO~~i:,,, OPERATm- J:':::::!:s~~', ...... ~i'i:: :' ',, , . HEASURED ( ~TH INTE~ATED-:~? '"'" VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE--" VERTICAL DEPTH TOTAL RECTANOULAR COORDI NATES NORTH/SOUTH EAST/WEST MD-TVD DIFFERENCE 1862 1862.00 1962 1962.00 22~2' O0 23~2 " - 2362.00 2462 2462.00 2562 2562.00 3065 3167 --2~6'2, 3062. 3162. 1800.00 1900.00 2100.00 2200.00 2300.00 2400.00 2500.00 '2eO0:O0 O0 ....... 2900%00 O0 3000. O0 O0 3100. O0 3702 3862.00 3600.00 1 16 S 6.87 W 47 S 5.66 W 86 $ 3.43 W 71 S 0.95 W 44 $ 1.~ W 32 S 1.42 W 69 S 1.01 W 23.34 S ! 52;92 S 0.01 W 73.73 S 1.57 W '214", ~5'"S 259.58 S 19.76 W O. 05 O. 06 O' O~ O..1 ! O. 12 O. O0 0.01 O.'Oa. O..02 O. 0! 1.96 O. 88 3.29 1.33 5.47 2.17 40.04 9.78 SPERRY-SUN WELL SURVEYING COMPANY PAGE ARCO ALASKA. INC. DS 3-34 PRUDHOE BAY ALASKA ANCHORAGE ALASKA COMPUTATION DATE DATE OF SURVEY FEBRUARY FEBRUARY 28, 1986 ,JOB NUMBER AK- KELLY BUSH I~- El OPERATOR-d. Mt=ASURED 'TH ::'~'~"~" ' D FOR EVEN 100 FEET OF SUB-SEA DEPTH I NT ,.- ~ VALUES TRUE ~~A TOTAL VERTICAL ii:~~ RECTANGULAR COORDINATES MD-TVD DEPTH ~P~ NORTH/SOUTH EAST/WEST D I FFERENCE VERTICAL . . : CORRECTION 1986 3812 3922 4033 4255 4367 4479 4591 5039 5151 5264 3762. O0 3700. O0 3862. O0 3800. O0 · 3962. O0 3900, O0 4062.00 · 40~ :00 4162. O0 4100' O0 "4262. O0 4200.-00 4362. O0 4300. O0 4462. O0 4400. O0 4762.00 4700,00 48~.00 ..... 4800.00 4962.00 4900.00 5062.00 5000.00 5824 5562. O0 5400.0'0 5500. O0 305.40 S 27.04 W 351.57 s 34.93 w 39'e,83-s: 43' 24 W 446.23 s 51 ~ 84 W 493.9= s 60.9o W 542, 48 ~ 70"- 0~--~ 59t. e~ s eo. o4 w ~4z,oo s eo. ze u 740,01 S '1t2"~4 W 78~. 27 S 125";.31 886.7~ S 152.78 W ~35.23 S 168.25 W YI-2-6-7-2-¢-~ ..... 234': 50' "[4 1174.49 S 253.78 W 50.28 60.70 82.6:2 105, ~3 117.28 129.18 14!.31' ! 65.67: 177.8~ 189.86 202.06 262.98 10.24 10.43 t0.92 1!.00 11.18 11.53 11.95 11.91 12.13 12;22 11.97 12.20' 12.67 SPERRY-SUN WELL SURVEYINO COMPANY PAGE ARCO ALASKA, INC. DS 3-34 PRI, JD~E BAY .: ~ASU~D I NTE~~.,T.,E VERTICAL DEPTH ANCHORAGE ALASKA COMPUTATION DATE FEBRUARY 28, 19.86 DATE OF SURVEY FEBRUARY 26, 19'86 :.~i,:,?." ': VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TOTAl2 RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST ,JOB KELLY OPERATOR"J. ~i~ ",,C' ~ VERT I CAL.;. ;. ; :'.~, ,4:~:.:,,..:~.~:..!, ' MD-TVD DIFFERENCE FT. 5937 6050 5~62.00 5600.00 5762.00 5700.00 ~$~2',O0 ~SO0, OO 59.62.00. 5~00:"~ 6062,00'. ~0,00:'00 222.47 S 269. ~5 S 1317' 70 ~-- . 4:14.e! S 273.62 W 293. ~4 W ~.~w 336.53 W 358.11 W 275.66 288.21 301.03 314"10 327.48 12.68 12.55 12, 82 3? :o7 3.38 6502 6162.00 6100.00 6616 6262.00 6200.00 6729. 6362.00 6300.00 7297 6862,00 6800.00 7410 6962.00 6900.00 1464.02 1513.26 1562.61 1811.97 S 1860.89 S 379.52 W 400.73 W 421.55 W 16 W 523.41W 541.73 W 340.97 354.43 367.88 4 50 435.83 448.65 13.49 13.46 13.45 13. ;5 13.32 12.82 79.70 7462.00 7400,00 2097.09 S 612.32 W 629.72 W 508.60 11.80 11.52 ARCO ALASKA. INC. DS 3-34 PRUDHOE BAY RLASKA SPERRY-SUN WELL SURVEYING COMPANY TRUE MEA,SURED VERT I CAL _ [' 'TH DEPTH ANCHORAGE ALASKA ..!,~ :~ COMPUTATION DATE - ?~.. FEBRUARY 28, :.,' '~~- 'NORTH/ SOUTH EAST/WEST PAGE 10 DATE OF SURVEY FEBRUARY 26. ~'-~, INTI 1986 JOB NUMBER AK-BO-:, KELLY BUSH I NG OPERATOR-J. 'SAMEC' VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH MD-TVD DIFFERENCE VERTICAL ' .: " CORRECTIiON: :.::.' 1986 FT. 8081 7562.00 7500.00 8191 7662.00 7600.00 7862.00 7800,' O0 ?e ,oo ' 2141.74 S 647.23 W 519.51 2185.09 S 664.65 W 529.88 S 698, 74 W :, 548.04 S 717.69 W ' 557.~0 10.91 10.37 9,3o e,:e6 8628 8062.00 8000.00 8736 8162.00 8100.00 8843 8262.00 8200.00 8562. O0 8500, O0 '" 9263 8'662. O0 8600. O0 9367 8762. O0 8700. O0 9470 8862. oo 8800. oo 2344.84 S 735.55 W 566.44 8.54 2380.68 S 753, 37 W 574.16 7.72 2414.57 S 770.90 W 581.19 7.03 2474' 24 S ": 805" 78 :.i: :::::5~2; 81.1 :: 2499, 80 S 822.75 W'" 597.42 4.6.1 2522.96 S 839.93 W 601.50 4. ~8' 2544.05 S 856.66 W 605.06 2565.72 S 873.44 W 608,75 3.54) 3.69 2666,79 S THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN ".i..THE 'NEAREST 20--~OT MD'(FROM RADIL]~O-F-Cq~TURE)"POi'NT$ .... SPERRY-SUN WELL SURVEYING OOMPANY PAGE 11¸ ARCO ALASKA, DS 3-34 ' PRUDH~E BAY ~ASKA INC. MEASURED ( *TH ANCHORAGE ALASKA COMPUTATION DATE DATE OF SURVEY FEBRUARY FEBRUARY 28, 198~> ,JOB NUMBER ~ KELLY BUSH!!! OPERATOR-d; VALUES FOR SPECIAL SURVEY POINTS TOTAL '!RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MARKER 1.86 .310 8706..1 8&44..1 9348 8743.&1 8681.61 ..... ".i.:. · ~:.422 8815, O~ .87~'0~' ~ ........ ~o7~.~o ......... ~o~o'.'~o 9715 .095.52 .033.52 .7~o .~2e.~o ~o~.4o 2532.41 S 847.45 W 2540.13 S 853.5. W ~6o~" ~ $. 900, ~3 w ',2612,1~ $ 906.35 W 2~17,7~ ~ ........~)-10,10 ~" 2624.24 S 914.38 W 2634.31S 920.89 W TOP SAG RIVER TOP SHUBLIK TOP SAD~EROCHI'T TOP ZONE 3 HOT "-TOP'ZONE 2 OIL/WATER CONTACT SURVEY DEPTH ARCO ALASKA, INC. DS 3-34 STRAT I GRAPH I C SUMMARY · .,~.~:~!?.??'~'~RIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA ~--~z~-~-~J~-K--~-~'--- >':..?'~ED ~~ -TVD TH I CKNESS ':~:'~:~ ~~.BKB BKB SUB-SEA VERT I CAL WITH (ORIGIN- TOP SAG RIVER TOP SHUBLIK TO~-'-~DEEROO~lrT ............... -~2~ TOP ZONE 3 9635 HOT 9670 : .~,ZONE 2 969! · ii"!...!:'.'OIL/WATER CONTACT 97!5 PLUGBACK TD 9823 ~TOTAL DEPTH DRILLE~---9860 8706.91 8644.91 8743,61 8681.61 9019.62 8957.62 9052.93 9~'72~eo "---~-O'lo~eo ~0~, 52 91~6,77 ~134,77 SEC 11 ,.' ,. 2540,1 2555.35S ' 2603.26S 2612.15S !2624'24S ~ 2655,87S ) 5E .45W 5~W 900.33W 90~.35W 91~TOl~ ....... 914,38W 934,68W '1 ) FROM CTNE~-E X TRApOLAT'IroI~-OI~'--DEEPE'~~ I ON. 2) COMPUTER PROGRAM - SPERRY SUN THREE DIMENSIONAL RADIUS OF CURVATURE. DATA CALCULATION AND INTERPOLATION BY RADIUS OF CURVATURE COPIPI_Tr ATION-DA-TE FEBRUARY 28, 1986 FEBRUARY 26, 1986 scALE :- 1 INCH TO 1000.00 / 1000.0 PRUOHOE BAT ARCO ALASKA, OS 3-34 FEBRUARY 26, AK-BO-60013 -t 0~0. O0 9860 HORIZONTRL TRUE NORTH O. O0 ~ --tO00. O0 --2000.00 · -3000. O0 PROJECTION INC. 1986 I 5CRLE :- 1 INCH TO 2000.00 / 2000.0 PRUOHOE BAY ARCO ALASKA, DS 3-34 FEBRURRT 28, QK-BO-60013 0.00 - INC. 1986' 2000.00 4000.00 60QO. O0 10000.00~ 1 92~1.42 -9860 20~0.00 40~0.00 VFBT I CNL PBOJECT I ON Su~geste~ £orm to .:-~ inserted in each "Active" well folder to d:eck for ti.~ly ccmpliance with our regulations. O~erator, Well Name and Number Reports and Materials to be received by: _Required Date Received Remarks _. Ccmp letion Report Yes !:~'/8--' ~-F~ I ' Well History Yes / ---I -.. Samples .,: : : . Core Description Registered Survey Plat ~ ¢3 ~--~-'~/~~ <) .'/'-[' .~, ., Inclination Survey .... ..~ /'vt -- ........... ~ "":-!' . Dire~ional ~ey ~ . .- _ ARCO Alas'ka F'.O. Box Anchorage, DATE' Sept'ember t2, REFERFNCE' -ARCO Magnetic 8-24-84 OH "'~'-q :' .~-,,-.,.,. ~ e DA 8-9--84 OFI ~2(~S5 DA 7-24-84 OH '~ape :-":2(~25 DA 8--i6-84 CH/CN$ .~28i87~ GO i -'~6--84,_, · OH~,.,'"'~'~'~°. --~, .. Run i Sch 8--22-84 CH ENl.. ~ o ~-6,494 _. Run 8 Sch '?--8-84 CH DII_ ~6942S Run iS Sch 9-5-84 [~1..t L.I~ ...~,-~,-..4 Run 7 Sch 7.--i5.-84 OH tape ~69S78 Run i Sch 8--i2--84 OH ~269448 Run i Sch * E~?OI-.IIO - i copy previotJ.~'Ly .-'~en'~ by ;'.:.'chl. tJ. mberger, ,ase s'ign and 'r'e~rurn t'he aTt'ached copy as' receipt' of (:Iai'a, Received P.¥ ................ ....... ~.. HAVE A NICE DAY' Al'O-i 429F ' ' TRANS. ~S2S DISTRIBUTION (on Ly OH) Ch ev~- ExpLora'~ion Services Exi:en.sion ExpLoration E x x o n Getty Harafhon Hob i L MobiL E & F' Phi L Lips' F'rudhoe Bay We L L R&D $ohio State of Alaska (NO An.~wer) ARCO ALa.ska, Inc. P.O. Box 'iOOS60 Anchorage, ALa$'ka 995 i ~ DATE: Sepfember ~2, REFERENCE: ARCO Open t 984 HoLe F:'inaL~ D.S. 3-34 7-24-84 F'ro Log 7--'~4-84.. BHC/Acou~s'f i Log/GR '?-24-84 DIFL/GR 7-24--84 CDL 7-24-84 CDL/CNI_ 7-.24-84 GR L.c.', g 8-9-84 F'r o !. og 8-9-84 BHC/Acou~f i Log/GR 8-9-84 DIFI../C.R 8-9-84 CI)L. 8--9-84 CDL/r_'.NL 8--9-84 G F;.'. 5" DA Run 'i Run ~ 5" DA Ru.n 1 Run i Run ~ Run J 2"&5" 2'&5' 5" 2"&5" 2"&5" "~"&5" _. ~~F'Leas'e .sign and refurn fhe affached copy a:s' receJpf o'F ('ia fa ~ Received By ................................................. HAVE A NICE DAY! i<eLLy Mc:Far Land ATO- ~ 429F TRANS. ~3t9 DISTRIBUTION Chevron ExpLorafion Service~ Exfen$ion Expl. orafion Exxon ~e't~y Marathon Mob i L MobiL E: & P F'hi LLip~ ~- R&D $ohio $~afe of Alaska ~ ~ STATE OF ALASKA ,.-. ¢ ALAS[ OILAND GAS CONSERVATION' )MMISSION ~,~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Workover operation [] 1. Drilling wellx~ 2. Name of operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of Well atsurface 846' FWL, 97' FSL, Sec.ll, TION, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 62 ..... ~, P-do -u~°' 6. Lease Designation and Serial No. ADL 28332 ALK 2328 For the Month of ,..~,, , 19 o,, · -' 1-' ' .7 7. Permit No. 84-97 8. APl Number 50- 029-21132 2. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 9. Unit or Lease Name pr,,dhoe Bay IJnif. 10. Well No. 3-3t, 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool Spudded well @ 0200 hfs, 07/13/84. Drld to 9860'TD, 07/25/84. OH logs. Ran & cmtd 7" lnr. Left 2000' of 9.5 ppg .NaC1 plus diesel cap inside 9-5/8". Left 9-5/8" x 13-3/8" annulus open for reserve pit fluid injection. NU tree and RR ~ 1200 hfs, 07/26/84. 13. Casing or liner run and quantities of cement, results of pressure tests 20" 91 5#/ft, H-40, weld conductor set @ 80' Instld w/1925# Poleset. 13-3/8" 72 O#/ft, L-80, BTC csg w/FS @ 2501' CIP w/2100 sx CS Ill +200 sxs CS I'l. 9-5/8", 47.0#/ft, L-80, BTC csg w/FS ~ 9324'. CIP w/500 sx Class "G" cmt. 7", 29.0#/ft, L-80, BTC csg w/9081' - 9860'. CIP w/300 sx Class "G" cmt. 14. Coring resume and brief description N/A GR to 2000'. 15. Logs run and depth where run DIL/BHCS/GR/SP f/9818' - 9314'. LDT/CNL/Cal/GR f/9818 - 9314'. ~1 O. DST data, perforating data, shows of H2S, miscellaneous data Alaska Oil & Gas Cons. Commission Anchorage N/A 17.1herebycertifythat,hef..~goingistrueandcorrecttothebestofmy//~:~ Area Dr'~11ingknOwledge' Engineer ~/'/Z,~ SIGNED T L~ _ TITLE DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be flied in duplicat with the Alaska Oil and Gas Conservation Commission by t.J~t~p~i t-~e succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate :or Work(Wet Ol~lltlon~ are Itlrt~t,' ' '-~.,5 .....~ ..... ' .:: Alas~:~ : ~'~'?:::'::"~:::~':1.?~::~::-[: ::: North Slope Borough '] Alaska - P~dhoe Bay :-- ;-:-" ' : / ~L-#28332 ] 3-34 Auth. or W.O. no. /~ue ' ~ 304107 - / Drill,' Complete & Perforate Rowan #35 AP1 50-029-21132 O~rator ARCO Alaska, Inc. Spudded or W.O. begun IDle IHour Spudded 7/23/84 0200 Hrs. Date and depth as of 8:00 ':7/13/84 7/14/84 thru 7/16/84 7/17/84 7/18/84 Complete record for each day re,or,d 7/19/84 IARCO W.I. 21 66% IPrlor status If a W.O. 20" @ 110' 480' (383'), TOH Wt 8.7, PV 22, YP 48, PH 8.5, WL 14, Sol 3 Acce~t Ri~ @ 2100 hr8, 7/12/84. NU diverter sys. Spud well @ 0200 hfs, 7/13/84. Drl 17-1/2" hole to 480', POH f/new bit. 13-3/8" @ 2501' 3696', (3215'), PU BHA Wt 9.1, PV 5, YP 8, PH 9.5, WL NC, Sol 6 Drl 17½" hole to 2530'. RU & rn 64 its, 13-3/8", 72#, L-80 BTC csg & w/FS @ 2501', FC @ 2420'. Cmt w/2100 sx CS III, followed by 200 sx CS II. Displ using rig pmp, bump plug. Perform top job w/200 sx CS II @ 15.0 ppg. NU & tst BOPE. RIH w/BHA, DO FC, cmt, FS + cmt to 2658'. Conduct EMW tst to 11.2 ppg EMW; OK. TIH, drt & surv 12¼" hole to 3696'. 2658', Assumed vertical 3003', 8-3/4", S3W, 3001TVD, 30.94 VS, 32.7S, 1.71E 3647', 24-1/4", S8W, 3615 TVD, 215.12 VS, 219.29S, 17.91W 13-3/8" @ 2501' 5661', (1964')~ Drlg ahead " Wt 9.5, PV 4, YP 9, PH 8.0, WL NC, Sol 8 Drl & surv~12~!~ hole to 5661'. 4139', 25-~/~'~, SllW, 4061TVD, 421VS, 424S, 53W 4636', 26-3~'~-SIlW, 4506 TVD, 640 VS, 640S, 95W 5072', 27~t/~, S16W, 4895 TVD, 837 VS, 833S, 141W 13-3/8" @ 2501, 6675', (1014'), Surv'g Wt 9.5, PV 5, YP 19, PH 8.0, WL NC, Sol 8 Dr1 & surv 12¼" hole to 6675'. 5631', 27°, S20W, 5.392.42 TVD, 1092.27,1075.01S, 219.70W, 6067', 27-1/2~, S22W, 5780.03 TVD, 1291.41, 1261.38S, 291.24W 6S94', 28°, S24W, 6246.42 T'v-D, 1535.45, 1487.25S, 387.11W 13-3/8" @ 2501' 7445', (770'), Drlg Wt 9.6, PV 5, YP 11, PH 8.0, WL 26 Sol 9 Drl & surv 12¼" hole to 7445'. 7211', 28-1/4°, S22W, 6790 TVD, 1825 VS, 1755S, 501W The above i$ correct ID-to 7/20/84 · 111tie Drilling Superintendent ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling_or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach deac, riptl~orof~all cores. Work performed by Producing Section will be reported on "Interim" sheets until final com. ple.tion.. Rep.o~ officia. I or r.epr, esenta.ti.ve test~_~_-:~_~"~" fo .n~..- 1.) Subm. it "Interim'.' .s. haets when filled out but not less frequently than every 30 days, or (2) on weDnesDay o! the week in which oil ~rlng ia, ~' ., .e~il~l~lt weeKly rot worKovers and ,Ollowing setting of oil string until completion. District ICounty or Parish I State Alaska North Slope Borough Field ILease or Unit #28332 I Complete record for each day while drilling or workover in progress Alaska Prudhoe Bay Date and depth as of 8:00 a.m. IWell no. 3-34 7/20/84 7/21/84 thru 7/23/84 7/24/84 7/25/84 7/26/84 The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 13-3/8" @ 2501' 7970', (525'), Drlg Wt 9.7, PV 10, YP 9, PH 8.0, WL --, Sol 10 Drl & surv 12¼" hole to 7970'. 7538', 27-1/2°, S21W, 7080 TVD, 1977 VS, 1897S, 557W 13-3/8" @ 2501' 9336', (1366'), Rn'g 9-5/8" csg Wt 9.9, PV 13, YP 7, PH 8.0, WL 9, Sol 11.5 Drl & surv 12¼" hole to 9336', 20 std short trip, CBU, TOH. top rams to 9-5/8", tst to 5000 psi. RU & begin rn'g 9-5/8", 47#, L-80 BTC csg. 8106', 25-3/4°, S22W, 7587 TVD, 2134S, 650W, 2231VS 8600', 23-1/4°, S24W, 8037 TVD, 2323S, 730W, 2435 VS 9256', 16°, S38W, 8730 TVD, 2534S, 857W, 2676 VS Chg 9-5/8" @ 9324' 9435', (99'), Drlg Wt 9.7, PV 14, YP 10, PH 9.5, WL 8, Sol 11 Fin rn'g 240 jts, 9-5/8", 47#, L-80 BTC & lnd w/FS @ 9324' RKB. Cmt w/500 sx C1 "G" w/.15% R-5 & .75% D-31. Displ using rig pmp, bump plug. CIP @ 1215 hrs, 7/23/84. Chg rams to 5" & tst to 5000 psi. RIH w/8½" BHA, DO cmt, FC, FS + 10' new hole to 9346'. Conduct formation tst to 11.2 ppg EMW. Drl 8½" hole to 9435'. 9-5/8" @ 9324' 9823', (0'), Drlg rathole Wt 9.7, PV 13, YP 5, PH 9.5, WL 7, Sol 11 Drl to 9823'. RU & rn DIL/SP/BHCS/GR f/9815'-9314'. LDT/CNL/CAL/GR f/9810'-9314' (fin GR f/9314'-2000'). bit to TD & drl rat hole. Nm RIH w/8½" 7" @ 9860' 9860', (37'), POOH, LD DP 9.5 ppg NaC1 (top 2000' 9-5/8" csg) Drl 8½" hole to 9860', cond f/lnr. RU & rn 17 jts, 7", 29#, BTC csg to 9860'. M&P 300 sx C1 "G" w/5% KC1, .5% D-31, 1.2% D-19, .05% R-5 & .2% D-6. Displ using rig pmps, bump plug. LC @ 9732', FC @ 9822', FS @ 9860' POH, LD DP, displ top 2000' to R ¢ i'V 0 Alaska 0it & Gas Cows. Commission IDate 8/07/84 ITM Drilling Superintendent ,AR~O Oil and Gas Company Daily Well History---interim I~tmctle~: This form is used during drilling or woH~over operations. If testing, coring, or perforating, sflo~ fownath3n name in describing work perfo(w~ed. Number all drill stem tests sequentially. Attach_description of all cores. Work performed by Producing Secttm3 ~ be reported on "Interim" sheet~ until final completion. Report official or representative ~ .on '~Fi~ai' form. 1) Submit ';l~teHm' sheets when filled out but'not ~ frequently than e~er,/3~ days, or (23 on Wednesday of the week in which oil stringis ~t.~bmlt ~ekly for work'overs and following setting of oil string until completion. _ District Field Date and de~l~' ........-/ as of 8:00 a.m. 7/27/84 The above ia correct For form~prepa~ation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 I County or Parish Nnrt:h R]ope Borol,l, gh rLease ATiT. or Unit Complete record for each day while drilling or workover in progress JState Alaska IWell no. 3-34 7" @ 9860' 9860', (0'), RR 9.7 ppg NaC1 (top 2000' 9-5/8" csg w/100' diesel cap) Fin POH & LD DP. Fill top 100' w/diesel, lnd tbg. ND BOPE, NU &tst tree to 5000 psi. Operations suspended - wait on completion rig. RR @ 1200 hrs, 7/26/84. 7", 29#, L-80 BTC csg FS @ 9860' - FC @ 9823' - LC @ 9732.88' JDate R/nT/R/' JTitle Alaska rm ~ ~ Anchorage MEMORANDUM TO: THRU: FROM: State of Alaska ALAS~-OIL AND GAS CONSERVATION COMMISSION C. V/~erton Lonnie C. Smith~-~/i Co~i s s ioner / /~ Harold J. Hedtund ~ SUBJECT: _ Petroleum Engineer DATE: July 16, 1984 FILE NO: A.Se. 1 TELEPHONE NO: Witness BOPE Test on ARCO's 3-34, Sec. 11, T10N,R15E,b~, Permit No. 84-97. Saturday, July 14, 1984: The BOPE test began at 7:10 pm and was cOnClUded at-9:25 pm. As the attached BOPE test report shows, there were no failures. In summary, I witnessed the BOPE test on ARCO's 3-34. Attachment 02-00IA(Rev. 10/79) :'.. STATE O[" ALASKA Ch,.& -CAS fDNSERVATION CfMM/sSION B. P.E. Inspection Report · . Operator Weii Location: Sec // T /D~/R/DL..,~/. M pril linq Contractor Representative//f/V/f.y , p/T£,f Permit # 75/- 77 /~'Z~;~Casing Set @ ,.. . ~ '-~ I ft, Rig #33- Representative/gE!/'//~ ~/~ Location, General_ ~. Weii Sign Cenera 1 Housekeeping .... Pmserve pit BOPE Stack "" ' " · .. · % - Annular Preventer':- B15nd Rams Choke Line. Valves H.C.R. Valve Kill Line Valves Check Valve Test Pres sure ACCUMULATOR SYSTEM Full Charge Pressure ~O~--~) psig Pressure After Closure/J J-O' psig Pump incr. clos. pres. 200 psi g. -- Full Charge Pressure Attained: ff N2 J~ -7~-a~ ~:'q~,'a ~! ?:-~ 17~-/? psig Controls: Master /~ Remote ~-J Blinds switch cover Upper Kelly ~r Kelly Bal 1 Type Test Pressure_ _ Test Pressure Test Pressure Test Pressure Test Pressure. Kelly and Floor Safety Valves · ,/ l. Znside ~OP. Choke Manifold ~o. valves NO. flanges A~justable Chok~ l~3drauically operated choke ./ Test Results: Failures~ /VD A/~ Test Time' ~'~7' Repair or. Replacament of failed equipment to he made within Inspector/Ccmmission office notified. /- , ..days and min ~ sec. rain/~ sec. Distribution orig. - AO&GiC " cc - Operator . :4 July 12, 1984 Mr. T. L. Fi~hian Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-036 Re: Prudhoe Bay Unit DS 3-34 ~RCO Alaska, Inc. Permit No. 84-97 Sur. Loc. 97'FSL, 846'F~L, Sec. 11, T10N, R15E, UM. BtmhOle Loc. 2561'FLZL, 31'F~, Sec. 14, T10N, R15E, I~M. Dear Mr. Fithian~: Enclosed is the approved revised application for permit to drill the above referenced Well. The provisions of the cover letter, dated July 3, 1984, accompanying the original approved permit are in effect for this revision. Very truly yours, / z.'~ // .//~/ t/.~ i// w~ ~- C. V. Chatter~o~ Chai~an of Alaska Oil and Gas Conservation Co~ission be Enclosure Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl'. ARCO Alaska, Inc. Post Otfice 0,.,^ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 11, 1984 Mr. C. V. chattertOn Commi s si oner state of AlaSka Alaska Oil & Gas Conservation commi ssion 3001 Porcupine Drive Anchorage, AK. 99501 . SUBJECT' DS 3-34, Permit to Drill (Revised) Dear Mr Chatterton: , to the locati°n we are resubmitting ~ _ · to Drill DS_3 -~+ion and pla. n views Due to change in the bottomhole -34. AttachmentS ur application for p~rmlt . ~_4~4no the ~=~ .,.~+rh anO t oe~a,-'"~ t' a ~= .... 'pti on of o~,,lication incJuJe~ a pla _ -~ximity pla. ,~_~ and descrl lbore; a. v-~ . ~-~'the Pr°P°S~e.~°~.~'~,'BOP equapment, and a s~e~- descripti°n u. -..~iverter system. the surface hole , Since this well will spud on approximately july 12 1984, your earliest approval will be appreciated- If you have any questions, please call me at 263-4944. Sincerely, a' O'ri~'~ ing Engineer TLF/JG/tW GRUB/L46 Enclosures RECEIVED JUL1 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, inc. is a Subsidiary ot AttanticRichfietdC°mpany -. STATE OF ALASKA .. ALASKA L.,,L AND GAS CONSERVATION CC,,,MISSION PERMIT TO DRILL 20 AAC 25.005 la. -iZype of work. DR ILL [~X REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL E~X DEVELOPMENT GAS [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 97' FSL, 846' FWL, Sec. 11, TION, R15E, UN At top of proposed producing interval 2400' FNL, 80' FWL, Sec. 14, TION, R15E, UM (~ Target) At total depth 2561' FNL, 31' FWL, Sec. 14, TION, .R15E, UM SERVICE [] STRATIGRAPH lC SINGLE ZONE MULTIPLE ZONE [] 9. Unit or lease name Prudhoe Bay Unit 10. Well number 1 1. Field and pool ~ Prudhoe Bay Field ~ ~,~ Prudhoe Bay Oil Pool 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. RKB 62', PAD 28' I ADL 28332 ALK 2328 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500~000 13. Distance and direction from nearest tow0 15. Distance to nearest drilling or completed 3 mi. NE of Deadhorse 3-11 well 132' (~ 4835'TVD feet 16. Proposed depth (MD & TVD) 9823' MD, 9228' TVD 18. Approximate spud date 07/12/84 14. Distance to nearest property or lease line miles 31' ~ TD feet 17. Number of acres in lease feet 2560 20. Anticipated pressures MAXIMUM HOLE ANGLE 25 o (see 20AAC25.035(c) (2) Proposed Casing, Liner and Cementing Program 19. If deviated (see 20 AAC 25.050) 2689 KICK OFF POINT 2700 feet. _ 3750 21 psig@.____ Surface psig@ 9??8 ft. TD (TVD) SIZE Hole I Casing Weight 30" I 20" 91.5# 17-1/2" 13-3/8" 72.0# 1 2-1/4" 9-5/8" 47.0# 29. O# 8-1/2" 7" CASING AND LINER Grade Coupling I H-40 Weld I L-80 BTC I L-80 BTC I L-80 BTC I 22. Describe proposed program: SETTING DEPTH Length MD TOP TVD 80' 30' I 30' 2470' 30' I 30' I 9297' 697' 29' ~ 29' 9126' I 18596' i MD BOTTOMTVD 110' I 110' 2500' I 2500' 9326' J 8777' 9823' I 9228' QUANTITY OF CEMENT (include stage data) 2000# Poleset 2300sx CS 111&4OOsx CS I 500 sx Class "G" 400 sx Class "G" ARCO Alaska, Inc., proposes to drill this Sadlerochit development well to 9828'TVD (9923'MD). A 20", 2000 psi annular diverter will be installed and operationally tested before drilling the surface hole. A 13-5/8", 5000 psi RSRRA BOPE stack will be installed on the 13-3/8" surface pipe. It will be tested upon installation (rams 5000 psi, annular 3000 psi) and weekly thereafter. 9-5/8" protection pipe will be set above the Sadlerochit. Upon reaching TD, the well will be logged. A 7" liner will be run across the expected pay. The drilling rig will be moved off and a completion rig moved on to finish completing the well. A string of 5-1/2", 17#/ft, L-80 tubing and packer will be run and set above the Sadlerochit. A downhole safety valve will be installed and tested in the tubing string. Selected intervals will be perforated within the Sadlerochit and reported on subsequent reports. Non-freezing fluids will be left in the uncemented annuli through the permafrost interval. DS 3-34 will be 132' away from DS 3-11 ~ 4835'TVD. There are no closer wellbores anywhere downhole. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge The sp for Commission ,~ f o r C om m i ss,~,F4~ CONDITIONS OF APPROVAL Samples required [-I YES [~[~NO Mud log required I FIyES '~NO Permit number APPROVED BY Form 10~,01 Directional Survey required IAPl number ~YES UNO I 50- SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE July 12, ]984 by order of the Commission Submit in triplicate 0 0 1000 2000 3000 40O0 5000 6000 7000 8OOO 9000 10000 11000 083-34_.: 1000 2000 3000 4000 _ _.JO 6000 I I I I I I II I I [ I I [ [ ' ' ' ' ! [ [ ' ' '' ' ' ' I [ I I II I I I I ~ ' ' ', m m ! , m , , ,i , i , i 20' CA.S NG TVD m 110 ARCO ALi .SKA, IN.0. 8OA._LE lIN.--lOOO FT. ~;-a/s-c~sm~ Tv=-~ ~00 SHT,- 97' ~FSL ~ 845' F~L o£ 2.5KOpT¥1)-~'oo Sec. 11, T10N, RISE, UM 7.~ THL- 2400' FNL ~ 80' FWL of - 12,5 Sec. 14, T10N, R15E, UM 17.5 · 1'VD -- 3660 MD - 8881 DEP ~m 21 a8817 D -.'G,1 MIN ~ I~F~'(TOTAR"ET) K-10 TVI~ m 7432 MD m 71 :4'B OEP m 1852 ii TVD m8172 Mr1 mgO00 OEP"'2Jl)3 / LCU TVD -- 870'. MD ,- 8244 DEF - 2638 ISHUBLIK TVD mm B717 MD --9260 OEP "2645 8-5/8" CASING TVD -- 8777 MD - 9328 DEP - 21 73 TOP SADLEROC HIT TVD -- 878? MD - 9337 DEP ,, 26?? e TAFI~ET TVD ,8861 MD-,,~41ODEP-~81~ O/W CONTAI :T TVD --g082 ! ID -- 8673 DEP" 2718 TO TVD m g:28 MD -' 9823 [ EP m 2780 RECEIVED JUL 1 ]19 Alasl~a 0il & Gas C3ns. Commlssim ................................................ ; , A, r~r.,hn, r;~n.n ........ 0 1000 2000 3000 4000 5000 6000 VERT I CFIL SECT I ON 7000 0 1000 2000 3000 4000 -F- O_ W 5000 W 6000 > 7000 8000 11000 7000 W 10000 9O0O DS3-34 z SCALE I IN. -' 1000 FT. - W COORDINBTES A V ARCO ALASKA, INC. SHL- 97' FSL & 846' FWL of Sec. 11, T10N, RISE, UM o : THL- 2400' FNL ~ 80' FWL of . '~' Sec. 14, T10N, R1SB, UH o Ii I Target - TVD= 8862 MD = o i DEP = 26 § RFCFI , rr) I JUL 1 1 o Alas~ ~ 0il & Gas Com. C0mmisskm o Anch0rag~ i i i i i i i i i i ! i I I i i i i i I i I i i i i i i ! i i i i I i i i i i i i i i i i i i i i i -5000 -'~000 -3000 -2000 - 1000 0 1000 2000 E - W OOORDINRTES -5000 -4000 -3000 -2000 -1000 0 tO00 2000 (D z ~ ~0 112 DEe /'~'~ DS3-34 E - H COORDINflTES ARCO ALASKA, INC. -700 -600 -500 -400 -300 -200 - ! OD 0 iiiii1,,! illllllll Illllllll illllllll lilllllll Illllllll lilllllll 77 4494 · 4754 48: 9 : ~ ~ 4948 ~fl13 ;d / DS ';-]1 / Alaska iiiiiiiii iiiiiiiii i -700 -800 -500 -400 -300 -200 - ! O0 0 - ~J I"INNl~I-11'NATI~ RNNULRR PREVENTOR PIPE RRMS BLIND RRMS SPOOL PIPE RRMS 13-$/8" BOP STACK DIAGRAM Accumulator Capacity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is S000 psi with 1S00 psi downstream of the regulator. 5. Observe time, then close all units simultaneously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report, (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 15-5/8" BOP Stack Test 1. Fill BOP stack and .manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retrac{~d. Mark running joint with predetermined plug seating' depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 5. Close annular preventer and upstream valves. 4. Functionally test chokes. -S. -In each of the following tests, first hold a 250 psi low pressure test for a minimum of 3 minutes, then test at the high pre~~ 6. Increase pressure t~ 3R)00 psiJ and hold for a mimimum of 5 minutes. Bleed~ to zero. 7. Open annular preventer andc~ set of pipe rams. Increase pressure to~S000Yps~ and hold for at least 5 minutes. Bleed press~-uln~ffo zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to S000 psi and hold for at least 3 minutes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to $000 psi below the bottom set of pipe rams and hold for at least 5 min- utes. Test reamining untested manifold valves (if any) with $000 psi upstream of valve and zero pressure downstream. Bleed pressure to zero. Open bottom set of pipe Back off running joint and puli out of hole. Close blind rams and test to $000 psi for at least 5 minutes. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are full of non- freezing liquid and all valves are set in drilling pos it ion. Test standpipe valves to $000 psi. Test Kelly cocks and inside BOP to S000 psi with Koom~y pump. Check operation of Degasser. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor. Perfom complete BOPE test once a week and func- tionally operate BOPB daily. 11. 12. 15. 14. 1S. 16. 17. 18. RECEIVED JUL 1 1 I 84 Alaska 0/I & Gas Cons. Commission Anchorage Revised 2/21/84 SURFACE HOLE D IVERTER ARCO ALASKA SYSTEM ]'NC'. SCHEMATTC IO" HYD. OPR. BALL VALVE WELL BORE ¢SEE DETAIL) I0" HYD. OPR. BALL VALVE ALL 90° TURNS ARE "TEE'' CUSHION I I WELL QBORE RESERVE PIT AREA NOTE' FLOW1_ INE DR ILL ING R I SER '--IO" O IVERTER I- LI ,,%, 20" 2000 PSI WP ANNULAR PREVENTOR ',,. 'Valves on diverter lines open automati- cally when the annular preventer is closed. I O" HYDRAULIC OPERATED BALL 20" CONDUCTOR PIPE "DETAIL" VALVES 20260102 July 3, 1984 Mr. T. L. Fi thian Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-036 Re: Prudhoe Bay Unit DS 3-34 ARCO Alaska, Inc. Permit No. 84-97 Sur. Loc. 97'FSL, 846'FWL, Sec. 11, T10N, R15E, UM. Btmhole Loc. 2772'F~.~, 53'FWL, Sec. 14, T10N, R15E, UM. Dear Mr. Fithian: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a omc cubic inch chip from each foot of recovered~core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20 A_~C 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To 'aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention Mr. T. L. Fithiau Prudhoe Bay Unit DS 3-34 -2- July 3, 1984 equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to co~encing ~qUipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a. Witness present. Very truly .yours, Lonnie C. 'Smith CommiSsioner of BY ORDER OF THM CO[~I~IiSSlON Alaska Oil and Gas Conservation Co~ission be~ Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office Bu~ 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 28, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil'& Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 3-34 Dear Mr. Chatterton' Enclosed is our application for Permit to Drill DS 3-34 and the required $100 filing fee. Attachments to the application include plats detailing the section and plan views of the proposed wellbore; a proximity plat showing the subject wellbore's position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we anticipate spudding this well on July 10, 1984, your earliest approval will be appreciated. If you have any questions, please call me at 263-4610. Sincerely~ T. L. Fithian Area Drilling Engineer TLF/JG/tw GRU8/L18 Enclosures RECEIVED jUL0 21984 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA '-'"' ALASKA fJ,~ AND GAS CONSERVATION CO~.,MISSION ERMIT TO DRILL 20 AAC 25.005 la. Type of work. 2. Name of operator ARCO Alaska, Inc. 3. Address DRILL I-~X REDRILL [] DEEPEN [] 1 b. Type of well EXPLORATORY [] DEVELOPMENT OIL [~X DEVELOPMENT GAS [] SERVICE F-I S'~I, ATIGRAPH~ SINGLE ZONE [~X"I~ MULTIPLE ZONE [] P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 97' FSL, 846' FWL, Sec.11, T10N, R15E, UN At top of proposed producing interval 2599' FNL, 101' FWL, Sec. 14, T10N, R15E, UH (¢ Target) At total depth 2772' FNL, 53' FWL, Sec. 14, T10N, R15E, UN 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 62', PAD 28' ADL 28332 ALK 2328 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 3 mi. NE of Deadhorse miles 53' ~ TD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9907' MD, 9226' TVD feet 2560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 2700 feet. MAXIMUM HOLE ANGLE 27 Oi(see2OAAC25.035(c) (2) 9. Unit or lease name ~¢ ':- Prudhoe Bay Unit 10. Well number 3-34 11. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool Amount $500,000 I15. Distance to nearest drilling or completed 3-11 well 160' ~ 4917'TVD feet 18. Approximate spud date 07/10/84 2689 _. psig@.~ Surface __~]_5/)___psig@ q??6 ft. TD (TVD) SIZE . Hole Casing i30" I 20- i 17-1/2"1 13-3/8" i 12-1/4"I 9-5/8" 8-1/2"/ 7" Weight 91.5# 72.0# 47.0# 29.0# 22. Describe proposed program: Proposed Casing, Liner and Cementing Program CASING AND LINER Grade Coupling H-40 Weld L-80 BTC L-80 BTC L-80 BTC Length 80' 2470' 9377' 801' SETTING DEPTH MD TOP TVD 30' I 30' 30' I 30' I 29' I 29' 9106' I I 8509' MD BOTTO~ TVD 110' I 110' 2500' I 2500' 9406' I 8777' 9907' I 9226' I I QUANTITY OF CEMENT (include stage data) 2000# Poleset 2300sx CS 111&400sx CS I 500 sx Class "G" 400 sx Class "G" ARCO Alaska, Inc., proposes to drill this well to 9907' MD (9226' TVD) to produce from the Sadlerochit zone. Logs will be run across selected interva]s. A surface diverter will be installed and operationally tested prior to spud. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17#, L-80 tubing and packer will be run;' The packer will be set above the Sadlerochit. Provisions for subsurface safety equipment will be run.-' A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A Sundry Notice will be submitted when the well is to be perforated. DS 3-34 will be 160' away from DS 3-11 @ 4917'TVD. There are no closer we]lbores anywhere downhole. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any interruption in the disposal process (i.e., rig move, shutdown of disposal process for an extended period of time). 23. I hereby certify that t.~fo~)going is true and correct to the best of my knowledge TITLE Area Dri 11 i ng Engi neet The space below for Commission use Samples required I--lYES ~NO Permit number APPROVED BY CONDITIONS OF APPROVAL Mud log required [-]YES ,J~NO (/0 3 / 8 4 Directional Survey required I APl number I ~YES E]NO I 50- O~.~ - SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE 3uly 3, 1984 by order of the Commission Form 10-401 GRUS/PD06 Submit in triplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 lb. Type of well EXPLORATORY [] SERVICE [] STRATIG~,PHIC DEVELOPMENT OIL [-~X SINGLE ZONE E~X DEVELOPMENT 6AS ~ ~ULT,.LE ZONE la. Type of work. DRILL [~X REDRILL [] DEEPEN [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 09510 4. Location of well at surface 97' FSL, 846' FWL, Sec.ll, T10N, R15E, UM At top of proposed producing interval 2599' FNL, 101' FWL, Sec. 14, T10N, R15E, UM ((~ Target) At total depth 2772' FNL, 53' FWL, Sec. 14, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 62', PAD 28' ADL 28332 ALK 2328 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 13. Distance and direction from nearest town I 14. Distance to nearest property or lease line 3 mi. NE of Deadhorse miles I 53' ~ TD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9907' MD, 9226' TVD feet 2560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 2700 feet. MAXIMUM HOLE ANGLE 27 oI (see 20 AAC 25.035 (c) (2) 9. Unit or lease name Prudhoe Bay Unit 10. Well number 3-34 11. Field and pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool Amount $500,000 15. Distance to nearest drilling or completed 3-11 well 160' @ 4917'TVD feet 18. Approximate spud date 07/10/84 2689 psig@ _ Surface 3750 psig@ 92?6 ft. TD (TVD) ! /I i Proposed Casing, Liner and Cementing Program !: SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT ! Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' I 30' 110' I 110' 2000# Poleset I I 30' 2500' 2500' 2300sx CS II 1&400sx CS I ,~ 17-1/2" 13-3/8" 72.0# L-80 BTC 2470' 30' I I 12-1/4" 9-5/8" 47.0# L-80 BTC 9377' 29' ~ 29' 9406' I 8777' 500 sx Class "G" 8-1/2" 7" 29.0# I L-80 BTC 801' 9106' II 8509' 9907' I 9226' 400 sx Class "G" ~ I 22. Describeproposed program: ARCO.Alaska, Inc., proposes to drill this well to 9907' MD (9226' TVD) to produce from the Sadlerochit zone. Logs will be run across selected intervals. A surface diverter will be installed and operationally tested prior to spud. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed and tested, The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17#, L-80 tubing and packer will be run. The packer will be set above the Sadlerochit. Provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A Sundry Notice will be submitted when the well is to be perforated. DS 3-34 will be 160' away from DS 3-11 ~ 4917'TVD. There are no closer wellbores anywhere downhole. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any interruption in the disposal process (i.e., rig move, shutdown of disposal process for an extended period of time). 23. I hereby certify that the f.o~going is true and correct to the best of my knowledge The space below for Commission use CONDITIONS OF APPROVAL Samples required I Mud log required I Directional Survey required I--lYES ~q::~O /[ I--lYES ~ I ~YES []NO Permit / Approval e t number84-98 ,-~ ~:k~70 APPROVED BY;,..~~- APl n r 50- d~-21132 3/84 SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE July 3, 1984 by order of the Commission /"DI IO guhmit in triplicate D83-3 0 1000 2000 3000 4000 5000 6000 ' ' ' ' ! I I I I I I I I I I I I '' ' I I ' ' ' ' ' I I I ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ~ 20' CAS NG TVD- 110 A RCO .SKA, IN" 8(3ALE 1 I1~ "1000 FT. 13'3/8'CASlNGTVD"':~r~O0 SHL- 846' FWL & 97' FSL of 2.5KOPTvl)'I3'00 Sec. 11, T10N, R15E, UN 7.5 THL- 2S99, FNL ~ 101' FWL of ' 112~55 Sec. 14, T10N, R15E, UN TVD--3721 MD -$768 DEP-240 , · B 18 DI :t~ 8~ kiln W L- . ~7998 Ir '(TO TARGET) r' ~1 EDI~i ~ID/~,11~ ~cE ~- - T'rD-7432 MD-7803 DEP--201 7 1~.-6 TVD -- 99172 I~ D '= 8730 DEP ' 2466 LCU TVD ,= 8'~'02 MD -- 99322 I ~EP m 27199 $HUBLIK TV[ -- 8717 MD -- g," ali OEP - 2726 / - ~ : 99-618' CASI ~G TVD -- 8777 D -- 9406 DEP ,~, 2756 TOP SADLEBOCHIT TYD--8717 MD--9417 rtl;P--2761 , TARGET T~'D - asea MD -',601 OEP - ~1P6! O/W CoN'rACT TVD--990~ 2 MD--99757 Ol:P-29913 TD TYD · 99226 MI2 -- lilac7 DEP -- 2999799 JUL0 2 114 Alaska 0il & Gas Cons. Commissio. Anchorage 1000 2000 3000 4000 5000 6O00 7000 8000 9000 10000 11000 0 7000 0 1000 2000 3000 ~000 5000 60O0 7000 8000 9000 ]0000 1000 2000 3000 '~000 5000 6000 VERT I CFtL SECT I ON ILO00 7000 D83-3,, tO00 2000 3000 4000 5000 6000 7000 8OOO 9000 0 0 10000 11000 1000 2000 3000 4000 5000 6000 ' ' ~ I I I I I I I I I I I I I I ' ' ' ' I I I I I I I ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' I 20' CAS INQ TVO ~ 110 ARCO AL .$KA, INC. 8CALt= I I~. - 1000 FT. . 13-SlB'CASlNGTVD--Z500 SHL- 846' I::WL ~ 97' FSL o£ ] 2.5 KOP l'V l"fYOO Sec. 11, T10N, R1SE, LrM ' 7__~ '. 12.5 THL- 2599' FNL ~ 101' FWL o Sec. 14, T10N, R1SE, LrM 17.5 'J'VD -- 3721 MC) ·3758 DEP--2dD f.P"71'DI Q,, MlN W '(TO 1' ARGET) - T'/O m 7432 MO m 7903 OEP m 20~ 7 '"1 K-It TVO -- 8172 hid - 8730 OEP - 2466 2 LCU TVD .- 8~'02 MO "' 8322 IEP ,- 2719 $HUBLIK TV[ m8717 MD--0~,30 DEP'2726 t : 0-6/8' CASI NG TVO -- 8777 ID ' 9406 DER · 2766 '~ .TOP SADLEROCHIT TVD '"8787 MD --9417 Ol;P --2781 TAR4]ET T~'D ' 8ll~ MD 'tl801 DEP "2701 O/W CON'rACT TWO --O012 MO -- 9767 OEP -- 2913 'ID T¥O,0226 MD-- 90¢17 DEP '- 2979 RE(YEIVF_D JUl0 2 ~Jaska 0il & G;is Cons. Anj~horaoo 7000 0 1000 2000 0 lO00 2000 3000 4000 5000 6000 VERT I CRL SECT I ON 3000 4000 50OO 6000 7000 8000 ;sion 11000 7000 10000 9000 D83-34 o -5odo E - N OOORDINFI~ES -4000 -3000 -2000 - 1000 0 1000 2000 o o z 0 -5000 I ,. I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i i i I : SHL- 846' FWL & 97' FSL of · , Sec. 11, T10N, RISE, b~ THL- 2S99' FNL & 101' FWL of Sec. 14, T10n, R15B,UM . - !Target- TVD-8862~ : ~ MD~9501' ~ DEP-2798'~ . RECEI /ED JUL 0 2 ~,la ;ka Oil & Gas Co!is. Commission Anchora ,e , i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i I i i i i i i i i i i i i i 1 i i i i i i i i i i i i i i -4000 -3000 -2000 - 1000 0 1000 2000 E - N COORDINFITES DS$-~,4 E - N OOORO INfl?£S . 0 -5000 -4000 -3000 -2000 - 1000 0 1000 2000 ('%1 ' ~m SHL- 846' FWL & 97' FSL of O o Sec. 11, T10N, RISE, THL- 2S99' FNL [ 101' FWL of Sec. 14, T10n, RiSE,UM I I ~ Target - o~ TVD-8862' , CD MD~9501 ~ CD o DEP-2798', , I RECEi /ED JUL 0 o Ala,~ ka 0il & Gas Cor s. Commission i i ! i i i i i i i i i i i i i i i i i i i i i i i i i I i i I i i i i i i i i i i i i i i i i i I I~k~ ~I I i i i i i I i -5000 -4000 -3000 -2000 - 1000 0 1000 2000 E - 1,4 COORDINS'I'ES DS :5- $4 F. - N O00ROINflTF, S . o -7~30 -600 -500 -400 -300 -200 - 100 0 o o o w z 0 I I I I I I I I I I I I I i ! i i i I i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i I i i i i i i i · 12~ .. . '~75~ ~ I" = I00' ~ '~19 , ! 810 / ~;0~3 . , " ¢ ql,4~ ,,' 5208 RECE VED 53:39 -'u' ~' : .,.,,,,--, 1laska Oil & [~s ',OilS. 6ommissior~ ^rmhar~ge ~-Ii i i i i i i i i I i i i i i i i i i i i i ! i i ! i i i i i i i i i! i i i i i i i i ! i i i ! i i i i i i i i I ! i i -700 -600 -500 -400 -300 -200 - 1 O0 0 E - 1,4 COOROINRTES DS ~- :54 E - N COOROINR~F.S · o -¢~30 -600 -500 -dO0 -300 -200 - 1 O0 w z o I I I I I i i , i i i i I i i i i i i i i i I i i I I i i i i I I I I I I I I I I I I I I i i i i i i i i i I i i i · i i i i ~ . ~~62,~ d75t I" -- I00' ii i i d~19 '~810 ' ! d '! . ~5208 i r ',73 . , ~FFr~ cn . ~ ~9 "' ~ ~ ~ ~ V L ~ / JUL 0 21:184 ~-~ Alask Oil & Bas Cons Commission ~ 5 4 0 5 Anchorage / = ' I' i i i i i i i i i i i i i i i i i i i I i i i ~ i i i i i I i i i i i i i i i t i i i i i i I i i I i i i i i i i i i i i i -700 -600 -5( I0 -dO0 -300 -200 - 1 O0 0 E - N COOROINRTF. S RNNULRR PREVENTOR PIPE RRMS BLIND RRM~ IRILLING SPOOL PI-PE RRM$ 13-5/8" BOP STACK DIAGRAM Accumulator Capacity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultaneously and record the tim~ and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test 1. Fill BOP stack and .manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark running joint with predetermined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close anmular preventer and upstream valves. 4. Functionally test chokes. -5. _In each of the following tests, first hold a 250 psi low pressure test for a minimum of 3 minutes, then test at the high pressure. 6. Increase pressure to 3000 psi and hold for a mimimum of 3 minutes. Bleed pressure to zero. 7. Open armular preventer and close top set of pipe rams. Increase pressure to SO00 psi and hold for at least 3 minutes. Bleed pressure to zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to 5000 psi and hold for at least 3 minutes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 3 min- utes. Test reamining untested manifold valves (if any) wit. h 5000 psi upstream of valve and zero pressure downstream. 11. Bleed pressure to zero. Open bottom set of pipe rams. 12. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minntes. 15. Bleed pressure off all equipment. Open blind rams. Hake sure nmnifold and lines are full of non- freezing liquid and all valves are set in drilling position. 14. Test standpipe valves to 5000 psi. 15. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 16. Check operation of Degasser. 17. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor.. 18. Perform complete BOPF. test once a week and func- tionally operate BOPE daily. RECEIVED JUL 0 2 Alaska 0il & Sas Cons. Commission Anchorage Revised 2/21/84 RNNULRR PREVENTOR P~PE RR~S BLIND DRILLINg SPOOL 13-5/8" BOP STACK DIAGRAM Accumulator Capacity Test Check and fill accumulator reservoir to proper level with hydraulic fluid. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. Observe time, then close all umits simultaneously and record the tim~ and pressure remaining after all units are closed with charging pump off. Record on IADC report. (The acceptable lower limit is 4S seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test 1. Fill BOP stack and .manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark running joint with predetermined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and upstream valves. 4. Functionally test chokes. -5. _In each of the following tests, first hold a 250 psi low pressure test for a minim~ of 3 minutes, then test at the high pressure. 6. Increase pressure to 3000 psi and hold for a mimim~m of 3 minutes. Bleed pressure to zero. 7. Open armular preventer and close top set of pipe rams. Increase pressure to $000 psi and hold for at least 3 minutes. Bleed pressure to zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to 5000 psi and hgld for at least 3 mir~tes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 5 min- utes. 10. Test reamining untested manifold valves (if any) with $000 psi upstream of valve and zero pressure downstream. Bleed pressure to zero. Open bottom set of pipe rams. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 mimutes. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are full of non- freezing liquid and all valves are set in drilling position. 14. Test standpipe valves to 5000 psi. IS. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 16. Check operation of Degasser. 17. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor.. 18. Perform complete BOPS- test once a week and func- tionally operate BOPE daily. l, 4, 11. 12. [13. RECEIVED JUL 0 21984 Alaska Oil & Gas Cons, Commis ion Anchorage Revised 2/21/84 SURFACE HOLE D ~VERTER ARCO ALASKA SYSTEM INC'. SCHEMATIC I0" HYD. OPR. BALL VALVE WELL BORE IO" HYD. OPR. BALL VALVE ALL 90° TURNS ARE "TEE" CUSHION ~LL QBORE . I RESERVE PIT AREA NOTE' FLOWL INE DR ILL ING RISER 20" 2000 PSI WP ANNULAR PREVENTOR ~O~10" DIVERTER LINE Valves on diverter lines open automati- cally when the annular preventer is closed. -- DR ILL lNG SPOOL 20" CONDUCTOR PIPE I O" HYDRAULIC OPERATED BALL VALVES "DETAIL" 'x SURFACE HOLE D IVERTER ARCO ALASKA SYSTEM INC. SCHEMATIC ~ IO" HYD. OPR. BALL VALVE ~ ~LL BORE (SEE DETAILI /.~.-'----I0" HY~. OPR. BALL VALVE mALL 90 TURNS ARE "TEE" I CUSHION -! ~LL RESERVE PIT AREA NOTE' FLOWL INE DR ILL lNG R I SER L 20" 2000 PSI WP ANNULAR PREVENTER IO" HYDRAULIC OPERATED BALL ""-IO" DIVERTER LINE -- DR ILL lNG SPOOL 'Valves on diverter lines open automati- cally when the annular preventer is closed. 20" CONDUCTOR PIPE "DETAIL" VALVES ARCO Alaska, Ir~' Post Offic. ,Jox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 11, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Plat - DS 3 Wells 27-34 Dear Elaine- Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer GRU7/L41'tw Enclosure If RECEIVED A!aska 0tl & GaS Cons. Coam~is~on Anchorag~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany Well 27' ,i, -- Well 28 · 96'.------ A ILT WELL LOCATIONS '~ .... L' No. 27 Lat. 70° 13' 49.344',' Long. 148° 16' 41.390' WELL No. 28 Lat. 70° 13' 48.188" Long. 148°16' 40.664" WELL No. 29 Lot. 70° 13' 47.035" Long. 148° 16' 39.937" EL. 28.72 Y 5,936,820.13 X 713 , 298 .`%2 EL. 28.28 Y 5,936,703.42 X 715,326.61 EL. 28.;50 Y 5, 936,586.87 X 715,354.96 WELL No. 3)0 EL. _ Lot. 70°13'45.881" Y 5, Long. 148°16' 39.203" X _ Gyr( / ,,3 751' 771' Gyro 796' Well SI Well .%2 WELL No..%1 Lat. 70° 13' 46.095" Long. 148°16' 1g.589" .WELL No. 52 Lat. 70° 15' 44.94[" Long. 148°16' 18.863" WELL No..%3 ,,' Lot 70° I$', 4:5.785, _ Long. 48°16 18.156 28.29 936,.470.32 713, :583.5`% /0 /5 1/4 82t' ~46' Proftoc/e~ Secfion Line N_OTES I. Elevations are ARCO datum M.L.L.W. 2. All distances ore grid. 3. X,Y coordinates are Alaska State Plane, Zone 4. CERTIFICATE OF SURVEYOR EL. 27.20 Y 5, 956, 511.24 X 714,057.70 EL. 27. 65 Y 5,956,394.6:5 X 714,086.01 EL. 27.89 5, 936,277.89 714, I 14.`%8 WELL NO. 34 EL. 27.75 _ Lat. 70O15'42.6`%~" Y 5,936,161.37 _ I_ong. 144~016' 17.411 X 714,142.62 ~3. LOCAT~O~ " Well ;5`%,._ ._J ['~0 WEST GYI~O° -- ,- ~- . ~- J Lat. 70 13' 43.467" Y 5, 936, 225.55 ' [ r ~ I I L~. 148°16"~8.846'' X 713,402.72 w.,, ,t I I , ,, '~ J J J ' . Lot. 7~13 , 47. 948 ,; - Y 5,936,698.57 RECEIVED ...' ~ .... -.~ , . . J LHD.~~~OClATES / . ~c~ , ~~ ' , . ARCO .Alaska, Inc. ' ~EREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED -~ .~CTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT T'~'-S ;LAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER wy SJ:'ER'VlSION At:D ALL DIMENSIONS AND OTHER DETAILS ARE 'C-:.: ECT. ! ASBUILT DRILL SITE No. 3 WELLS 27, 28, 29, 30, 31, 32,33, 34 LOCATED IN PROTRACTED SECTION II, TION, R 15 E, U.M. DATE: 4-24-84 SCALE= I"-'$00' CK'D: LMH F'LD. BK. 84-10, 84-11 i CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE ( 2 ) L o c (,/".:A ........ "~ ~ i / "' ?'' :" ,(2 thru 8) / , (3) Admin (9' th~u 11) (4) easg ~thru20) i/ OPE ?-,/,/,-xZ thru (6) Add: 1. Is the Permit fee attached .......................................... 2. Is well to be.located in a defined pool ............................. C.~ 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore pl?~ include~ ............... 7. Is operator the only affected party ................. 8. Can. permit be approved before ten-day wait .......................... e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. YES NO 21. 22. 23. 24. 25. REMARKS Does operator have a bond in force ................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is conductor string provided ....................................... Is enough cement used to circulate on conductor and surface ........ Will cement tie in surface and intermediate or production strings .. Will cement cover all known productive horizons ................... Will surface casing protect fresh water zones ........... Will all casing give adequate safety in collapse, tension and burst Is this well to be kicked off from an existing wellb°re ............ Is old wellbore abandonment procedure included on 10-403 ........... Is adequate well bore separation proposed .......................... Is a diverter system required ..................................... Are necessary diagrams of diverter and BOP equipment attached .[ Does BOPE have sufficient pressure rating - Test to -~D~O psig Does the choke manifold comply w/AP1 RP-53 (Feb.78) ................. Additional requirements ............................................. Geolosy : En~in~erins..: LCS ~'¥~ BEW WVA . ,, HJH JAL rev: 12/08/83 6. CKLT INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE LIST FOR NEW WELL PERMITS (1) Fee (2) Loc APPROVE DATE (2 thru 8) Company Lease & Well No. YES NO , . 9 ~10 11 (5) BOPE (21 thru" 2z4) (6) Add: ~,~' , , REMARKS 1. Is the permit fee attached .......................................... 12 13 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 2. Is well to be,located in a defined pool ............................. /~0~ 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ........... 6. Is well to be deviated and is well bore plat included ...... "/~/C 7. Is operator the only affected party ................................. 8. Can. permit be approved before ten-day wait .......................... · Does operator have a bond in force .................................. · Is a conservation order needed ...................................... ,,,L ;~ · Is administrative approval needed ................................... Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in suyface and intermediate or production strings ... Will cement cover all known productive horizons .................... Will surface casing protect fresh water zones .. ] .... Will all casing give adequate safety in collapse, tension and burst Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... ~¥. Are necessary diagrams of diverter and BOP equipment attached ~/~ . Does BOPE have sufficient pressure rating - Test to Does the choke manifold comply w/API RP-53 (Feb.78) .................. . Additional requirements ............................................. Geology: Engin/~e~?ing: WVA -- JKT~.~/HJH JAL ~ MTM~,'j ' ' rev: 12/08/83 6.CKLT INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE . , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. Company Well ARCO ALASKA., iNC. D.S. 3-34 Field PRUDHOE BAY County, Stare NORTH SLOPE~ ALASIC~ Date 7/24/84 THIS TAPE CONTAINS THREE (3) FILES Curve Name (Abbrev.~ Standard Curve Name Logs Used Scale GRC i G~%iMA K~Y (CASED HOLE) GR 0-100, 100-200 ~ , GP~i ; G~i~ ~Y (M~qIN PASS) ~ DIFL 0-100. i00-200 GM ! G.~M~.~ RAD7 (REPEAT) DIFI, 0-100, 100-200 =~d~, ' G3D~ RAY (~-~IN PASS) CN/CDL 0-100, 100-200 GR! G~ RAY (REPEAT) CN/CDL 0-100, 100-200 CALM CALIPER (MAIN PASS) CN/CDL 6-16 CAL CALIPER (REPEAT) CN/CDL 6-16 DEN DENSITY (REPEAT) CN/CDL 2-3 DEi'D~ ' DENSITY\[~z~,r)~^Tq PASS) CN/CDL 2-3 C~ COMP NEUT (~iAL~ PASS) CN/CDL 60-0 COke. NEUT. (REPEAT) CORRECTION (REPEAT) CN C~/CDL CN/CDL CORR 60-0 CORM CORRECTION (bLiIN PASS) CN/CDL -.5 - .5 ACM ACCOUTIC LOG (I~IN PASS) AC 150-50 AC ACCOUTIC LOG (REPEAT) AC 150-50 ! RFOC FOCCUSED LOG-RES. (REPEAT) DIFL .2 - 2000 RILM DIFL DIFL MEDIUM INDUCTION LOG (REPEAT) DEEP INDooTION LOG (REPEAT) RILD .2 - 2000 .2 - 2000 Page 2 of 2 Pages ECC # 2025 S.O. # A-63155 LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO ALASKA, INC. Well D.S 3-34 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date 7/24/84 THIS TAPE CONTAINS THREE (3) FILES Curve Name (Abbrev.) Standard Curve Name Logs Used Scale RFOM FOCUSSED LOG RESIST. (._MAIN PASS] DIFL .2 - 2000 R~ MEDIUM INDUCTION LOG (~iAIN PASS DIFL .2 '- 2000 RLDM DEEP INDUCTION LOG (bLAIN PASS) DIFL I .2 - 2000 CFOC COND. OF FOC. LOG (REPEAT) DIFL I 0 - 1000 OF MED. IND. (REPEAT) DIFL I 0 - 1000 CILM COND. CILD COND. OF DEEP IND. (REPEAT) DIFL 0 - 1000 CFOM ~ COND. OF FOC. LOG (MAIN PASS) DIFL 0 - 1000 COND. OF MED. IND. (MAIN PASS) DIFL 0 - 1000 CL~i CLDM ~ COND. OF DEEP I~. (MAIN PASS) DIFL 0 - 1000 DENP POROSITY FROM DENSILOG (REPEAT) CN/CDL 60 - 0 DNPM ', POROSITY FROM DENSI. (MAIN PASS CN/CDL 60 - 0 ECEiVEO ; x R U D H 0 ~ ~ A Y N. S L 0 P:, A L A S K A Alaska Oil ~-GaS~on~. GR IS RUN WITH Di~L. GR1 IS RUN WZTH CN/CDL. ..'D~pTH :' '.'G"Rt AL ';'._. ~C:'~ CN ~ ~NP : ~ DEN ~.~ _.R_LO~C mT- MV Ami AmZ IN. % ~ _GM/~; GM/CC ~HM-M * 43.4 75.5 1,4Q -1 .64 0.4****** ~,1 92 .:~'1~"" 62 '"'3 : 4'~5-~ ~:~7~ 1.42 , .... . .. , . .... ........ 9260. t$3. 115. 92, 10, 62.3 ~1,9 76.1 1.3~ -1.&6 0.4****** ~.1 .... .... . ,, · 9P68. 183. 122 62,3._.~5,1 7~.6 _,'1.42-1_,~5_5 ..... · 70. 2.11 _ 927P~7, 92,~ 36.2 96,6 1.06 --2L12 .... -- '~ ....... ~' ~' ' ......... ""~'~ ..... ~ ~' ': '~ ~..~ 83~3~:.: ~t' ~ 2~7 1,_7~ .:~.:. ,.'5': 8'~;:3 ': ~1~ ~ -1 ~8 9280. 183. 96. 92. 10. 62.3 32,,7 79.7 !.33 -1.74 9284. 1:~2. 67, ~.6. 10. 6~.4 35.9 7~,1 __ 1.~3 -1~64~.~~t~ _.~_2 ~ 183. 92. ~ ] 6~,1~ ~,~ 89,6 !,1 5 :-g~&~**** ..... ;~1 .... 9304, I r3. 72, ~:t' :1:::::::::'8:::':::: :84:-8::: 1:,2~%::::J-..~,74 0 9308. 170. 54. 137. 10, 57,3 34,1 80,2 1,33 -1.63 0.4****** 2,8 ......... . ......... :: ::: :: :: ~=, ~, ::.: ~=-~:::~.~,'.:,.~:~:~: :..st: '~::~ ~ :..': -... : t-..::_:: '.':' ...'.:.:::~b '' :::: :~ ~'..i '~ ',-. ~i ~.:;:: : : ~ "93 '.:'::~ gS':., ~::: d:,O~ - ~, 86 0 · ~ * ~* * * * 3 · 1 9312. 159. 120. 140. 11. 80.2 37.3 21.8 2.29 0.26 0.3****** 20.3_ · ........ , : z:z:5o.z _ 93t6. 131. 11!. 130. 12. 91.0 30.7 18.9 2.~4 0.04 7.7 4.2 1.~ =........ '.~..'~ .'..: .:~:.-.: :... ~ :....~,.....- . ~ ~,'._~. ~'~ : '93] 8':!'i:':3~..""32'u" 20.~8:~::~::2-3:1 : 0.05 12.0 25.8 5.3 9320. 103. 218. 133, 12. 85.3 30.9 20.8 2.31 0.!~ 15.L__2~,_.~ 13.1 '93 8'"' ':... .::-t:: .. .............. ' 9324, ~2. 70, 1~3u · 12, 80,5 ~0~ .2 ~5_ .5 2.23 0.11__ 17. :~:93~6:~ :..::..~,.: ,~,.9 ........... o,9~ 2,~ 0,13 18,~ 1~ 3 22,0 9325, 70, 67, 62, 9, 8t,1 25,7 21,B 2,29 0,02 18,5 19.8 23.8 0 04 20 2 18,4 25,1 : :..:.,~vi....5... .... ~ . ... ~ ,:: ::. :: :::::::: :: : :: : : e 9332. 61 , 74. 65. 10. 75.7 2~.3 18.8 2.34 0.03 17.9 17.3 21 .5 ..'.-' 37 0,03 _1 7 ~3 1 _5- 5 1 8 ~3 93x6.~ 61. 69. 70. 1n~. 75 .6 23.9 17.5 >-. 36 O. 03 1~. ~ 1~.4 17.7 .: ~;~,~:?:::..;..,...::,~.:.~:., -:~'..?:~.r~:=.:...~......,;:a=...=<· ?~.;-~W. ' ~36: · :~38'. '. : ~..6:3:,.'.'..: :,.0: -.~ 2"2.~ ~ ::~: ~::- 0 · 05 1 7,5 9340, 5~. 64, 65, 9, 75.5 23,9 16,3 2.38 0.03 17.0 ~. , : : :: ::: : : :::::::: ::::::: :: :::: ::::::::::::::~.7' ~ ::: ~: I 0 ~ 0 ~ I 9~ 93~4. 57. 95. 79, 10, 75.7 21.2 10.1 2.48 -0.03 22.B _ ~,: ::~:..... ~ . : ::: ~: : · 7/30/84 TIM~: 16:29:55 ALASKA INC. 3-34 /RUDHOE BAY N.SLOPE,AL~SKA ~4GE 2 GR IS RUN WITH DIFL. GR1 IS RUN WITH CN/COL. ~.R" C.'.., A.C ! :CN:..~:=NP '~ D"N FT, MV API API IN, % % GM/CC CORR GM/CC R_~OC Ri'LM~ - R i'[-O ..... OHM-M OHM-M OHM-M ..... ' ....... ;..L.. ~_. , I -0,02 9348, 58, 166, 265, 10I 71,8 14,6 2,0 2,52 0,02 ~ !~i~.160 0.06 9352. 121. 62. 50. 10. 60.1 14.2 1.2 2.~3 -0.01 '. - _ ~2 ~61 0. 9356. 121, 104. 101. 10. 75.7 24.6 2.4 2.61 O. ,: 8.,~: 2'51.. .=6. 03 9360. 121. 97. 80. 9. 76.9 22.2 -3.5 2.71 0.03 :.to. 07 9364. t20. 297. 143. 9. 72.2 26.1 -2.1 2.68 -0.01 9368. 110. 236. 325. 9. 69.5 27.4 5.7 2.56 -O. 9372. 93. 176. 232. 9. 86.9 34.3 12.2 2.45 -0. 12'52 -0. 9376. 87. 150. 198. 9. 82.0 15.5 1.5 2.62 O.O0 _ 2~65~: -0. 01__ 2 2.8 1 $. 3 ....._2.J..,_4 56. ~_ J_$ .... 2 ....1 _4._..Z,__ _ 186.8 16.1 15.2 03 261.5 .... 1_8,9 .... 15.2 0/~ 264.9 19.0 15.5 34.2 29.4 29.7 29.7 I 9.0 .... !5.., ~. 19.1 15.0 07 29.6 19.6 1.3.7 02 29.7 _2_1.7_ ~4._7 _ 11 29.8 19.7 21 .1 26_,__0__ 1~8_._9_, 21 . 5 38,7 24.7 24.7 57.4 44,8_ 9380. 59. 254. 110. 9. 57.9 16.0 5.6 2.56 _G__~..0_2,_114~6_,5 .70_.~_"1_ ....9~0.2 ~5,,"9..'~. 2~::,2;61 ___0.0~6 _15_.3~._.9_ .... ,¢_9__.~_ ?~_.5 :~8~02::3:270',_0 _ 90..8 1 I 8.4 9392.. 94-. 72. ~ii~9:,~291'.3 99.1 165.9 9404. 115. t15. 92. 9. 80.8 19.5 8.0 2.52 -0.01 32.8 25.9 29.2 :'~S~' 0.0~ 13Z 5 38 4 39 8 9~08, 109, 125, 112, 9, 78,0 18,7 7,8 2,52 -0. ~ ~ ':i:"~-" "~ ¢ ::''"'9~t"~ ...... :~'"?::': '"'~"~?:"'":'"-.2~'~.iI'' :" '7%' '":'"""~'~:~" "' ~"~'7 ~ :~ ~.:.iii · ' '" 15~:i~" "il :{:~::~:: 2 ::: ;.~6: 0. 9412. 1t0. 95. 92. 9. 105.2 21.3 6.2 2.55 O. ;:j;: '"!;: '.: *';) .'; '.' .. .... ~ · '...' :" -.~!j. ]. '.',:: ~! !i!fZ : i x: :f: ii: ;:~ f ; : ;: 9.4 :~' 4' , .. 1 '1!.~.-': "..9!~'.~ .;-.~ 2:," 5 !.' ~9:,.~ ~ 5,:','::,,:, 2.3 9 - 0 · 9416. 119. t65. 161. 9. 122.8 31.4 22.5 2.28 -0. :.20 - o. 9/-,20. 90. 228. 156. 9. 110.1 22.5 12.3 2.45 O. " O. ~42~,. 60. 57. 39. '~. 84.6 23.S tl .9 2.45 O. 01 1.52.6 41.;"3 57.1 01 87 . 9_ __34 . 3 41 .. 5 _ 04 54.3 24.9 29.5 02 33,1 lC.,4 15,4 . 01 12,7 10,1 10,2 02 17,7 12,0 12,2 10 23.7 11 ,3 15,0 O0 14.5_ 19_.5. .21.2 . 08 31 · 6 7. ~ _J..O_.,_.4 11 5,2 I ,Q I ,4 9&28. 66. 35. 38. 9. 89.4 19.8 25.2 2.23 0.02 4.8 ~38~.. :::~".'::S.'6.~......? . :'.. ~6.'.u .': 2'~ ~..': 2'2~:~:,,, 2.28 0~.. 0~1_ ___1 _8_, ~ 9432. 51 . 43. 42. 9. 9'3.6 20.6 21.5 2.29 0.01 8.5 ~ ~.,~.~,~,~ ,, ~ ~2,-. ~:5:.~ ~' 2~,~2~,~,~'~ 2.29 0.05 22.9 0~4'.'.." '?-:'" ~'.:"~.'..' ":'.J'..:~:'..:i :'.. .:.~ ...'n' i' i'~'~'"' .~,::..: ~' ~ ~i ~~~ 11.1 17.1 15.9 14,0 _. 17.5 22.3 9436. 37. 43. 42. 9. 87.3 22.9 18.7 2.34 0.01 24.9 ~:,' :,~: :'7~.:~..'.:': .~...~'::,.~ 9~0. 22. 51. 411 9i 93.7 23.3 26.0 2.22 0.03 25.6 20.6 7/30/34 TtM~: 16:29:55 ALASKA INC. 3-34 FRUDHOE BAY N.SLOPE,ALASKA GR IS RUN WITH OIFL. GR1 iS RUN WITH CN/CDL. 94/-+4. 12. 31. 32. 9. 88.2 22.3 22.3 2.28 0.00 30.2 23.6 30.,_~ ~': '..9;~.,~..-~'.. ~,.,~:-..:::~i~' ~,.;.':- .~,-~ ..~: ~.~i:.: ~ ? - _ :, :~:~..' ~ ~:...'.-'29:'~"':....i"~Qi;:. :.,~:9..~: 9~ .~ ::... 2..4..~, :::: ~3,8 2. -~. O.,_g~ .... Z~_.~ 2 O. 6 29.7 9448. 11. 26. 28. 9. 93.8 23.2 22.0 2.29 .~_03 ._ 2~__1 ...... 2~.,_~ ..... 5_2.7 9452. 26. 40. 38. 9. 95.2 23.9 19.6 ~.33 O.uO 25.9 .:~','~:;~,.'.'... ~:t, '.:':....:::::::'. ....... ~.L :. :...'.~,:~ """~:: :":: '~' ::" ~' : : ~ ~ 54'~ .'. 3".4.:', .. '>:3:~1 .:.': :' .'.'~ ~. '~'7:: :.' 23'~7~ :'1'5:~ 8 :,: 2 -: 39 0 · 05~~ ~ _ .9456. 40. 34. 32. 9. 88.2 23.0 18.5 2.34 0.0~ ..... ~j~ ....... 2.~..2 ................................... o..oz ....... 9460. 34. 31. 30. 9. 90.1 Z5.7 18.9 2.34 0.00 29.6 ========================== =================================== :::: ::: ~ "':. ::2..'3 :, 2:, 29 0..02 _~ ~ ...... 9~64. ~. 30. 29. 9. 95.4 25.~ ~0.0 2.~2 0.02 ~0.~ ...... · '..:."2 0.0~7_.8 ~ 26.~ 9468. 34, 30, 30. 9. 90.2 2~.1 21 ,0 2,30 0.01 34.8 30.3 42.7 ~::.: :::,;~:: .....~,~.~,.:....:.':...-:.~;.~.:.:)~:: .":~,.:~;.- : ....:.,: ~.:.. ' :~ ~.~ ..~ : . :.... ~ : ..~ : .: ~: : ~ ::: ~ -- :: :~.::.: : , X' .... : ::... ~::~ ....... ~ :... ....., :: : ::, ::~ ,:::: :: ~: _ ~ ~:~::~70 ~Z:i~'z3.:., ..'35...: 9..~ .. :92:.-8 :,?~.:2 2~.) ...... 25 0 01 ~~3~_26_.Z 40.0 -0,0~3 O,_~_ 947,6. 36. 36. 34. 9. 95.3 25.1 24,0 2,25 __0.~ 28,~__ 2_4~,~ ~9480, 31. "3t. .. '90.~ 22.7 15.7 2.3 ~3': ~-3~ ..... ':.' 4 $~.~: .~; ::~i 02:': 38 ':2 9'~ ~:. : 5.'9-':....... '":.-~8:'~': -....:: ::'46--~... .-. .:.. ::.:,.9 .,-.::-....: .82:.. 4....-:-::. 2~..-3.-...:..18:-::~::::::: 2,35 _ 0.04 21 . 7 _ 2_. 9504. 29. 32, 28. 9 . 84.7 23.7 20.2 2.32 :95: ~"~ ""::--~~-'--~':'"~ :' ':' :':?:"'~: ':'~:~'": :':: ':""~ '~"' :: :~ ' 0~:. ":51-.~::.: '..3:'2,...:.23:~ ..9'~: :8:7~ 2. ~:~:~:U .... .32 9508. 31 · 30. 29. 9, 85,~ 21,4 23,6 2.25 '9~ t0.. ~ :':"...9t ~.:8: ": ~:~'~ 1' Z 2 ::~o: ::: 2.27 0.01 30.9 22.3 32.2 0.01 29.4 27.~ 3_8,.~ O. 02 35 ._?______2_ 8 ,_5_ ....... 0.04 30 2 26.3 40.> 0.02 31 .8 24.2 36.3 O. 01 26.3 22,0 33,5 24.9 22.1 32.1 26.1 20,_9 _31_,~ 95!6. 25. 30, 31 · 9. 95.8 24.0 25.5 2.23 0,01 22.3 18.8 27.6 : ~518.'. ..':'~ '-:9~...'::9~'-.':0'."2~'.,:0~...2'0':,:~: ::: 2'3:2 O. 02 22.6 .. 21_. 2~..2~. 5 9520. 33. 38. 34, 9. 87.9 22,8 20.0 2.32 -0.02 : ":>3~:'3:~ :~'27 0 O0 . . . ~t:::...::: , ~: ~; · :::~ i ::: ~:; ' ::: :: ::::: ~: · 2¢.1 22.6 32.8 21,6 23.3 33.S _ 9524, 33. 26, 27. 9. Q1 .7 23.6 23.1 2.27 ::: ::: ~...:~:..: .'.95~ : ~ 2.~'~'9,.':.23~5 ::2~26 9528. ~9. 40, 33. 9. 89.9 22.9 19,7 2.32 9532, 35. 30, 27, 9, 91 .8 23.4 21.5 2.30 : ~,::8.:-..22,~ '..~9.:~ :2"32 0,03 30.3 23.9 35.7 0.04 0.02 28.6 22,3 _ 35.-_3 25.3 24.2 33,6 0.05 26.5 22,9 34.5 0.05 26.9 23.3 0.05 26.3 22.5 3 _2 .__._ . 9536. 32. 37. 36. ~. 87.1 23.8 16.3 2.38 0,03 24,6 20.9 Z~.1 . 7/30/84 TIM~: 16:29:55 ~0 ALASKA INC,, 3-34 ~RUDHOc, ~ ~A~ N.$LOP;,~LASKA PAG=~ 4 GR IS RUN WITH DIFL. GR1 IS RUN WiTH CN/CDL. T~..] ]~ DE N FT. MV API API IN. % % GM/CC CORR RFQC GM/CC OHM-M OHM-M 9540, 40, 42. 36. 9. 88,4 21 .8 19.0 2.34 9544. 55. 45. 41 · 9. 87.5 23.4 18.9 2.34 :~ ~ ::,.: ,. Tz :.~..~: .... :.. ~ . ~i~.~ ,..": ."...."-.i,M: .~ :::: i: ~'4:~:~: :,¢3,-,.." !:: 2.~,, ..:. :':9": ,~.'.. 2 - 2:7 9548. 44. 42. 41 . 9. 91 .1 21.7 18.6 2.34 '. ~' :c..~..iiii: !!t.'." ' -'~i~: ~.~ ': ~ - :~:"..:..:.~.. '::.' '~!:J~. : : ' :: 9552. 105- 93. 91. 9. 76.5 22.6 1.9 2.62 ~.:.~ :. · :. :. ~.'.z.~'.:, ¥ v .. ..'. · ·. :.' :':: · .'~:'.~ '..: '. :. ~, .:~ ':: ~.. : : ::: :::: :::: : :9 .... , ]' ~ T .'~ -:7..: I::( ....... ,:'-' ........... 7":'.' .:::.' /:: ~ ~' . ........ ~:: :: :~:~,, ,: ~ 2!:~'::;~ -1:D::::,''.. ..... "0.-2-: .....: ~ :... ~ .::9 :. 5 7 9556, 120. 68, 76. 9, 73.6 19.5 -0.7 2.66 ."5 :~ ~i" '-...': ' .~r~© .'.-'-':~'.::~,' .~'~..:: '.'..: ~ :.i':.',......:.:?:'~ ....'~' ~ ,~ ..;.:...::.. :~i: i~-;~:. :: :: ::: : : 5 9560. 114, 96, 96, Q. 76,9 25.4 1.6 2.62 '~2 '. ::: ~!'~5 "' ? - 3 ~ 1 t :::: :.2 ' 70 9564, 110. 90. 93. 9. 77,1 23.5 -3.6 2,71 0.03 0.05 23.7 19.6 25.3 .... ~_~ .... ~ .... 24 4 1~.., 2~.6 18.5 20.1 25.2 0.04 0 . 05 . 2~7 ,__1 ...... 2~3__._ 3_ .3 O, 2. 0.05 26.0 21 .2 29.6 0,03 19.9 17.1 .... 19._.~? 0.05 11.4 10.9 12.6 o. ,33 9. Q ....... J.O_._. ~ ....... ?._._.9 o_.t6 19 . 5_ .... 8..6 ...... 2._ 1 0 . O 2 7 . I __-(_..___~_ ........ _7_.: _7_ 0.17___9.4 7,2_ . 7'.2 . 0.19 8.3 7.8 7.7 .'~'56-'5:.'.:'-'.1~' ~ .?.3~5' .--0.,;1 . .:2 ." 55 0 · _114 I 0 · .2~__.7_,___9. _ ?.. 9 ~568 . 98 . I I 0 . 96. 9 . 76 · 7 26.7 0 · 2 2 · ..6_5 0 · 21 _8.__~ .......... _7~_7_ ......... Z_, ~ 9572. 76. 82. 113. 9. 73,9 22.6 8.3 2.51 -0.01 12.4 11.1 12.0 ..:'9 .:::- .-~:.-'~'.:' ~:2 2~::48: O. 08 _ 1~ _ JZ.¢ J.8. : ',."~ :,05:_: Z2.1 22._~ . . 6 9 ) 84. 20. 43. 9~¢~; 8~8~ 2~ ~¢~2. ~¢;Z/ 0-0:) : 21., 4: · .20. u ~ o. ~ · ........:-... :".. 2 .. ....{.. Z.~.'9:.... :-4,::6::: .2:':5~ '~'">~0.09 21.2 1 2 95~6. ~6. 11'4. 111. 9. 7~.5 27.4 0.0 2.65 0.09 9.9 10.2 11.2 0.11 lO.g 8,_~ ._ ~.~ 9600. 108. 99. 95. 9. 79.1 23.8 2.8 2.60 9604. 81. 53. 61. 9. 79.2 23.9 12.5 2.44 9608. 38, 52, 39, 9, 84,0 22,0 17,3 2,37 0,05 9.4 10.2 9.9 0.04 0,03 0.04 0.02 21 . 4 12 ._5._ J_?_. ,3 11 .7 16.0 1F.9 20.0 17.4__ 20,2_ 23.7 16.6 19.2 9612. 27. 23, 21 · 9. 87,5 23.8 22.4 2.28 9616, _P7. 26. 24, 9. 85.7 20.4 20,2 2.32 : 9~1:.'8~::::::::::::::::::::::::::::::: ....... '": "'~:: ''¥'' :..' :: "'~ '" '"';'-'"""".:. 'i9 ,:.....:..'-182;'5 '?-.:"':..-~:" 'n.' : :, :7~...:( 7.'... 1':~8 2:-::: ~' ~ 2 0,03 14.0 6,5 5,6 0.01 9.0 1.,,.. 0 3.4 0.01 ~.0 5.2 ? .8 0.02 11.5 9620, 49. 50, 55. 9. 84.7 23.6 20,9 2.30 9624, 31 · 26. 24. 9. 87,2 22.3 20.7 2.31 0.02 12,6 8.8 8,3 0.05 0.04 13.1 11.1 4.2 4.2 9628. 44. 62. 41 · 9. 83.9 21,1 16.3 2.3~ 0.06 ~ ...,.: ~.-':.':~'. :..,:...:.:': ...:.' ~ .,,. :., '.~'n : :~ :: :~ 01 ~:~3g.: :,: ~.:: 5.-7.-'.. :.. ~.:6~ . . 9:.... ..:,: '7'9:::.,'1 ::::: 9.Z 2:. 49 - O. 0.02 ___?-__4~ ._3,5 3,3 8,3 5,2 4.5 17.3 9632, 95I 95. 52. 9. 75.5 23,7 6.6 2.5~ 0.02 11.1 11 .2 11 .'$ : 7130184 TIME: 16:29:55 ~0 ALASKA INC. 3-34 FRUDHOE BAY ' N.SLOP;,ALASK.~ GR IS RUN WITH DIFL. GR1 iS RUN WITH CN/CDL. '~: i! ~' :: .'.,.' ,: :. i" ~.':~i':;. :':' ~.~..,~ '.->~..¥,~.. '..' .. ;.';. ':.:' : : :: ~ ::: m. ' ............................ · "GR1 ':- :: u'- N J~ 0 R R R F 0 C R ~L M .... ~ I L D_ FT. MV API API IN. % % GM/L~_(~__~r_M/CC_QHM-M QHM-M OHM-'"I ~9636. 35. 25. 24. 9. 81 .4 20.5 18.5 2.34 :. "'::.: ~o', :z ,3~ 9640. ?5. 29. 24. 9. 79.0 19.9 18.6 2.34 ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::]: :: :::: :~:: ::::,::,:: ::: : : ]:: :: ::-----~ 0.04 12.3 0.02 7.7 0.01 .8.9 0,03 9,1 5.7 ..... 7 ."..Q · 6.5 ....... 5,9 7.0 6.5 0.02 I ~__.__Z ....... 7_.._4 ..... 6_.6 9644. 28. 26. 23. 9. 83.3 18.5 20.2 2.32 0.05 13.5 6.g ~.7 96~8, 27, 25, 25, 9, 82,2 20,7 22,2 2,28 0~_2_ ~.~ ......... 6~_!__ ...... ~_~. 9652, 26, 26, 24, 9, 88,2 24,~ 24,5 2,24 0,01 5,2 4,5 4,3 :::: '..... :'...:.. :h. : :..~ :. :?: .::::~::::... === ============ ============== = ==:.::: :: ~::: :: ,.9: 5::~ ~::_::.... '.::... .~'3 ?.- :~.:3-.'~, 2~,~, :: 2 "24 q, 0 965~ .... 24, 26, 24, 9, 88,2 21,7 18,6 2,34 0,01 9,5 ~,8 4,5 : 0.02 I 3 · 8 5 · '!,'~.,~ i2;:33 -5.03 10.7 5_,_8 ....... 5,7_._ 9564. 23. 28. 29. 9. 79.5 21 ,3 20.8 2.31 o, ..:?~ .... :20,.... ... 2~.:,· .~U2~.: ~:-'~: ~-:~:' ::~'~::~"'z~'~:'""~"~~ :?::'~-0 9688, 23, 34, 28:' :: :2;:: ~:':~"1 15,5 6,~- '~: .1'::~:~z~o.o 9696. 19. 28. 26. 9. 92.9 22.9 23.8 2.26 0.02 ..,~ 6 o.o~ 9700. 24. 32. 27. 9. 91 ,4 21 ,8 21.7 2.29 0.02 " ~ ~'?:~'~" '~ '~'"':" ~ ":"' ~'~:"'":: "' :'~: :"~: :.~ "' ~ ~ 2"~0 O. 03 9704. 53. 30. 50. 9. 83.7 23.1 23.8 2.26 0.00 '9~06., ......... . 2s: ~.....:.:: ..:.~: ...].: :~.~ ............. ":']'.:~:'.'"""':.".."': '" ..~ :..:.2 :..2~:~O::2,25:: 0 .0 2 9708. 23. 26. 22. 9. 91.6 24,3 25.3 2.23 0.00 24 0.00 9712. 31. 32. 35. 9. ~3,~ 2~.z 2~,2 z.~ o.oo 9~:.714:.:: ::~:: :~:::': ';: ' "~:"':" ': ":":'" ' ..:'.:::~:'~::: ..:.. · : :..:~..:.~ : ::~:.:. ::; :.~. ~:~:: :t:: 2.:: :::i ~ 3 0.00 14.0 5,7 5,4 12.9 5.3. .... 5.0 _ I 3 ..__0 ..... ~_._ 7_~ ....... 4..___5. 8,6 3,8 ..... 7.5 ~.4 3.9 11.0 3.7 ~.7 9.5 3.3 _ _5.2 6 ._~ ........ _~.,._ $ ....... ~__-__7_ 6.3 2.4 2.3 9716. 19, 25. 22, 9. 91.5 23,2 25.7 2.23 -0.01 5,5 9720. 18. 32. 26. 9. 89.9 26.0 22.8 2.27 0.00 5.5 :' : ,: ~'..:':~,~..:.'-.:.':.-~.~-.-:~'.,. '.~.-.:~.~..i:":~'5.::~:::: ::2.23 O. 00 ' 5.6 2.0 I .9 1.~_ 1.._8 . 2.1 2.0 2.1 Z.O 9724. 15. 25. 21. 9. 90.4 24.0 24.0 2.25 0.02 5.4 !..'.' ':z? o. o 3 5. ~ 2.1 Z.O 2,1 2.0 9728. 1~. 28. _27. 9. 89.6 27,.8 21.4 2.30 0,03 5.6 2.1 2.0 ~: 7/30/84 TIME: 16:29:55 ,.,0 ALASKA INC. 3-34 · ?RUDHOE BAY N.SLOPE,ALASKA PC, SE 6 GR IS RUN WITH 31FL. GR1 iS RUN WITH CN/CDL. . ~i~:.i,'.'~':~' · :: :: ::: __ ............................................. FT. MV Ami APl IN. % % GM/CC GM/CC OMM-M O.B?i._~M D_~M_-M.. 9732. 18. 27. 26. 9. 90.5 25.2 24.4 2.25 0.03 5.0 2.1 2.0 9736. 12. 28. 24. 9. 92.2 . 25.2 . 25.9 2.22 0.01 5.4 2.1 2.0 ..............:::: 38, ~ ~4',' ~;" ' ~: ::7:3~ ~'': .'..- '"'-~ . .'. -.::8~'9' :.2'.) ~ ~ :1:: ::::: ~ -'~ 25 0~, 0 ............ 0 5 · 4: ............................. 2 · 2 2 · 0 9740. 18. 26. 29. 9. 90.5 26.7 25.8 2.22 -0.01 5.1 2.0 1 '-2~26 0.0~ 5,5 ~_,9 1 .7 9744. 8. 26. 21. 9. 88.9 25.6 24.7 2.24 0.06 5.5 1.8 1.0 24 0.01 9748. 7. 33. 24. 9. 93.1 24.9 24.6 2.24 C.O0 9752. 10. 26. 22. 9. 87.~ 26.4 16.2 2.38 0.06 9756. 7. 38. 28. 9. 88.8 22.6 17.5 2.36 0.05 6.3 2.4 2.2 9760. 17. 29. 39. 9. 81 .3 20.5 20.9 2.30 0.00 7.7 3.3 2.32 O. 02 8. & }~,3___ 9764 .... 5. ,28., 39. 9. 80.4 19.9 19.6 2.33 0.04 9.2 %:,0';:2~0 :. :,L1:2..' 8 11,5 I 1.1 :::9 :,...:..-:::..,,,:-9..~-.::...:,...7:3 ~-:,.;:.. 2:5. .:7¢.. ; .-. 1..~--. 2:~:.., ,2,. 47 0.07 ~. ~ o. Q . . 1 9788. 106. 103. 39. 9. 73.5 25.9 12.9 2.44 0.03 6. ~~7:...:..."4/~:::...:. i~ .." i '~!: i:: i~ :'¢~!'~ ..~ ..L. ;:: ~::,'~ '-~- t:~'.~" ~ : ~ ::::i ~3:: 0 · 0 2 ~ · 9792. 84. 57. 39. 9. 73.5 22.4 12.7 2.44 0.04 11 . :'"" ~::: * ':" ": ";" ~ '*'"" ;""' ~ '" ' :'"':' ~ :"~'"' '~:~'.': "'~ ": '"": '":': t::I..,~: :'~ '"' ~: ::::: :::2~:::: :4 ~ :~0:; :: . 0 ? 9. 9796. 1,g3. ss. 92. 9. 2.5 21.6 10. 2.48 0.08 o. 7' :s6; o.o4 o. 9800. 183. 55. 92. 9. 62.3 21.6 8.1 2.52 0.09 O. o. o9 o. 5.2 1 5 · 4 1 · 6.4 2.2 2.0 7 7.1 7.'3 3 8.6 8.5 9 9.5 9.2 4****** 4.1 4****** /-,,.1 4****** 4.1 9804. 183. 5&. 92. 9. 62.3 22.1 7.2 2.53 0.09 O. :::::::::::::::::::::::: ..: '...~...;..: ,, ,....:. , .. :.: ~'.:::::::::: :: :: :: : :i:.'7;'.-'7'2:53 O· 09 O. 9808. 183. 54. 92. 9. 62.3 21.9 7.2 2.53 0.09 O. ~ ..':!: '.: .:.,.:.'.::.': .~- :...,:...;..::: ::: ~ :': 9.81:0.:.' '" 20' $."..':' .. ?.', 5:: : 2 i:~: 3 0.0 9 0. 4****** 4.1 4****** _4,1_ _ 4****** 4.1 4****** 9312. 183. 54. 92. 9. 62.3 16.7 $.1 2.52 0.09 ~'....'.J ~: :..:.'. ?:~ '. L':~..'...:'.~'.:..:. : ~ : ~: .. ===================== ::::¢ :::::~: :::: :: ::.: :: --~-' :981..4,:~;:" :-:i :'1,:~ 2 ~ ~6 0.02 9816. 1.83. 54. 92. 9. 62.3 19.7 10.2 2.48 0.08 0.4****** 4.1 0.4.*~,.~__.4.1 0.4****** 4.1 0,4~.*****. 4.1 _