Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-155
i: i: STATE OF ALASKA ' ALASKA"OiL AND GAS CONSERVATION COOl'MISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS r-I SUSPEM3ED r-I ABANDONED E~ SERVICE [] Pluaa~ad beck for redri// 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-155~'./~ . 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-21180 4. Location o, well at surface l~ 9. Unit or Lease Name 1645' SNL, 1378' EWL, SEC. 22, T11N, R14E ~ Prudhoe Bay Unit ii.~ '~'; 'V[~"~ 1. r 10. Well Number At Top Producing Interval 15-8 355' NSL, 2489' WEL, SEC. 15, T11N, R14E· -~~'_~~ At Total Depth ~'~ 11. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 1981'NSL, 1645' WEL, SEC. 15, T11N, R14E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 71' I ADL 28306 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. o~ Aband. I15. Water Depth, if offsho re 116. No. of Completions 9/16/84 10/1/84 10/5/93I N/A feet MSL I Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD', 19. Directional Survey FO. Depth where SSSV set Fl. Thickness of Permafrost 11345' MD/8837' TVD 7448'MD/ YES [] NO []! None feet MD J 1900'(Approx.) 22. Type Electric or Other Logs Run DIL/LDT/CNL/GR, CET/CNL/GR, CET/CNL/CBL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETrlNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 90' 30" 370 sx PF II 13-3/8" 72# L-80 Surface 2539' 17-1/2" 1938 sx PF "E"/400 sx PF"C" 9-5/8" 47# L-80 Surface 9397' 12-1/4" 500 sx "G"/300 sx PF "C" 7" 29# L-80 9068' 10898' 8-1/2" 525 sx Class "G" 5" 18# S-95 10878' 11169' 8-1/2" Not cmtd-pkr set @ 10878' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MDI PACKER SET (MD) None None 9057' 26. ACID, FRACTURE, CEMENT SQUF_EZ~ ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9007'- 9500 ' 71 cufl Class "G"-squeezed to 1600 psi 7650' Bridge Plug 7453'-7650' 295 cu ft Class "G"-squeezed to 1500psi 27. PRODUCTION TEST Date First Production JMelhod of Operation (Flowing, gas lift, etc.) Not on production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. DEC - 1 ' 995 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS ~ ~TION TESTS ... NAME Include inlerval tested, pressure data, all tluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 9424' 8313' GOC Not avail. Base Sadlerochit 11170' 8807' RECEIVED DEC - 1 93 Alaska 0il &_.__ .__Gas Cons. Commission 31. UST OF ^~^CHMENTS ,~rage 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Drilling EngipeerSuoervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 15-8 DESCRIPTION OF WORK COMPLETED PRE-SIDETRACK BRIDGE PLUG INSTALLATION & CTU CEMENT PLUG 9/16/93: MIRU CTU & PT equipment to 4000 psi. Loaded wellbore w/Hot Freshwater, then RIH w/CT mounted Inflatable Bridge Plug & inflated to set at 9500' MD. Pumped 12.6 bbls Class 'G' cement, to place a cement plug on top of the Bridge Plug, to isolate the slotted liner located at: 10878 - 11169' MD (Z1B) Ref. Log: CNL 10/11/84. POOH w/CT. Pressure tested cement plug to 500 psi OK. Rigged down. 9/17/93: RIH & tagged top of the cement plug at 9007' MD. Tested cement plug to 1600 psi OK. Rigged down. 9/18/93: RIH w/tubing cutter & jet cut the 4.5" tubing at 7709' MD. Left the well w/lower wellbore Plugged & Abandoned & w/cut tubing for pending Sidetrack. RECEIVED DEC - 1 199) Alaska Oil & Gas Cons. Commission - ;:ELL: DS 15-8 '~f~i~:~-:'~' BOROUGH: NORTH SLOPE -~ UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATION~ PAGE: 1 ACCEPT: 10/03/93 04:00 SPUD: RELEASE: 11/01/93 06:00 OPERATION: DRLG RIG: NABORS 2ES WO/C RIG: NABORS 2ES 10/04/93 ( 1) TD:ll169 PB: 9007 RIH W/BRIDGE PLUG MW: 8.5 Seawater RU SLICK LINE, RIH. SET BPV. ND, NU BOPE& TEST. PULL HGR TO FLOOR, CIRC OUT DIESEL. LD TBG. RD. TEST RAMS. MU BRIDGE PLUG & RIH. 10/05/93 (2) TD:ll169 PB: 7650 CUT WINDOW. MW:10.0 WBM RIH W/ BP. SET @ 7650'. TEST CSG. OK. DISP WELL TO MILLING FLUID. POOH. RIH W/ SECTION MILL. CUT WINDOW F/ 7448'-7478'. 10/06/93 ( 3) INSTALL PACKOFF. MW:10.0 WBM TD:ll169 MILL SECTION TO 7498' CIRC. POOH W/ MILL. RIH W/ MULE PB: 7650 SHOE. WASH TO 7507'. PUMP 30 BBLS WATER, 52.5 BBLS (300 SX) CMT. POOH 20 STDS. SQZ'D CMT W/ 1500 PSI. SQZ'D 5' '- BBLS AWAY. POOH. REPLACE PACKOFF. .. · '::-~::....:. . : .... : .-:: ::!..-. . . . . . . RECEIVED DEC -- 1 ~$J~ Oil & ~s Cons, 8~mmis~ion Anchorage MEMORANDU Alaska Alaska Oil and Gas Conservation Commission TO: David Johnston, DATE: Chairman ~ THRU: Blair Wondzell, ~;~--~,- FILE NO: P. I. Supervisor FROM: Bobby Foster, SUBJECT: Petroleum Inspector September 17, 1993 PG911RAA.doc Perf. Cmt. Plug Test ARCO - PBU_-~_DS 35' Prudhoe Bay Field Friday, September 17,1993: I traveled to ARCO's DS 15 - 8 this date and witnessed the pressure test of a cement plug set above a CTU inflatable plug set at 9500 feet. The pressure was brought up to 1600 psi and held for 30 minutesJwith no loss of pressure. I departed the location at this time due to another job but [ talked to Mr. Selman, ARCO Rep., the next morning and he informed me that he ran in the hole with a bailer and incountered stringers of mud and cement from 7400 +-. He said he finally got to hard cement at 9007'. According to the well plan, the tubing will be cut off at 7700', the rig will move in, pull the tubing, then set a retainer and put 100 + feet of cement above it for a kick-off plug. Summary: I witnessed the pressure test of the perf. plug set on ARCO's DS15 Attachment: Copy of wire line report. Well Work Log I DS/Well '~.~ate J'~ode ~metJvi~ ~i~,.-- /~ -~'~, [~L I-'ICL ~CTU ~PD Tbg/I ~ SSSV Pulled ~ SSSV Pulled~Ser. No. SSSV Ran ~ SSSV Ran S~o. SSSV~Nipple Carrier Pulled (assoc. w/Kvalve) Carrier Sen No. Carrier Ran (assoc. w/Kvalve) Cagier Ser. No. Min. Rest./Depth Rec°ver Diesel I N°n Re=v' Diesel Cum' Hrs'~ ~ ~ I 9 5/8" PSI ~ 13 O/O" PSI Tagged PBTD [~'~/ITP~ ~0 ~ ~ ~ ISIT~ ~' SSSV Remarks " Tubular Casing Problems Cost Estimate 1. /~;~ 2: ~¢~ ff 3: ~ 4: ~/~ 5~ R~ R~ R~ Re~ R~s $ $ $ $ I~'" :~:-~:: ~ ~:' ~: ~:~ ::~1 .o,a,.,u,ds Time Log Ent~ , · / ~,:': '~ Page [ of · /'. lete' ~ In~mplete ~ ~- 1 / Time Log entry · Signed: ~~*~~~,'~'-.,-""'~ Page ~" of ~ · : 15-08 "/ Spud Date: 9/16/84 ,~'~ Or£ginal RI~E: 71' Top of Format;ion: 9355' .~anular Flu±d: Diosol/10.6 Na¢l RCO Alaska, Inc. - Prudho~ API #: 50-029-21180-00 Con~letion: 10/19/84 Hanger Type:FMC Gert III Max Hole Angle:80° @ MD: 11248' Reference Log:CNL Date:10/ll/84 Tie In: Type: PRODUCER Status: New Manger: 26' Angle @ TS:59° Angle @ TD:80° Date: 00/00/00 ALL DEPTHS ARE RKB DRILLING MD TO TOP OF EQUIPMENT EXCEPT WHERE NOTED. J-1 k'C.1 Jewelry (J) Depth Description 1 2180' 4-1/2" Camco BAL-0 SSSV Nipple ID=3.813" 2 9037' BOT PBR Assembly 3 9057' BOT 3-H Packer 4 9114' 4-1/2" Otis XN Nipple ID=3.725" 5 9126' 4-1/2" W/L Re-entry Guide 6 9127' 4-1/2" Tubing Tail 9104' ELM Tubing Tail (Logged 01/28/85) 8 10878' BOT Wolverine Packer ID: 4-1/2" Otis XN Nipple ID=3.725" J-2 J-3 Casing and Tubing (C) Size Weight Grade 1 13-3/8" 72# L-80 2 9-5/8" 47# L-80 3 7" 29# L-80 4 5" 18# S-95 4-1/2" 12.6% L-80 Top Bottom Description 0' 2539' Casing 0' 9397' Casing 9068' 10898' Liner 10878' 11169' Liner-Slotted 0' 9127' Tubing-PC Interval Zone 1 10878-11169 lB 8600' SS=10603' MD J-5,6 8700' SS=11032' MD C-2 Perforation Data (EH DEPTHS) (P) FT SPF 291 N/A PBTD=-lll90 ' TD=11345' Date Comments 10/19/84 SLOTTED LINER Revision Date: 06/02/93 by PTB Reason: 4D CONVERSION Previous Reason: 05/05/91 Well 15-08 -I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I J-7 C-3 C-4 STATE OF ALASKA ALA~,-d~ OIL AND GAS CONSERVATION COMMISS'~--,'N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon x Suspend __ Operation Shutdown__ Re-enter suspended well__ Alter casing __ Repair well__ Plugging X Time extension __ Stimulate__ Change approved program x Pull tubing __ Variance__ Perforate__ Other X Plugback for redrill 2. Name of Operator I 5. Type of Well: 6. Datum elevation (DF or KB) ARCO Alaska, Inc. ! Development X KBE-- 71' feet Exploratory 3. Address Stratigraphic 7. Unit or Property name P. 0. Box 196612, Anchorage, Alaska 99519-6612 service Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1645' SNL, 1378' EWL, SEC. 22, T11N, R14E 15-8 At top of productive interval 9. Permit number 355' NSL, 2489' WEL, SEC. 15, T11N, R14E 84-155 At effective depth 10. APl number 50- 029-21180 At total depth 1981'NSL, 1645' WEL, SEC. 15, T11N, R14E 12. Present well condition summary Total depth: measured true vertical 11. Field/Pool Prudhoe Bay Fie/d/Oil Pool 11345 feet 8837 feet Plugs (measured) Effective depth: measured 11190 feet Junk (measured) true vertical 8810 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 90' 20" 370 sx PF II 90' 90' Surface 2468' 13-3/8" 1938 E' & 400 sx "C" 2539' 2539' Intermediate 9326' 9-5/8" 10898' 8299' Production 1830' 7" 525 sx Class "G" 10898' 8744' 8801' Liner 5-1/2" 5-1/2" Notcemented 11169' ~ ~= ,~ ~ , ~ ~ ~. ~. Perforation depth: measured Siotted liner from 10878'-11169' true vertical Slotted linerfrom 8763'-8801' SEP - 3 i993 Alaska 0il & 6as Cons. C0mrnissi0~ Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 PCT@ 9127'MD Anchorage Packers and SSSV (type and measured depth) BOT 3-H packer @ 9057'MD; 4-1/2", Camco BaI-O SSSV@ 2180'MD 13. Attachments Description summary of proposal x Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 9/15/93 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: O]1 x Gas~ Suspended ~ Service 17. I hereb~-..c,=e,.rtify that the foregoing is true and correct to the best of my knowledge. Signed ~ ¢~,~(J~ Title Drilling Engineer Supervisor I ~,l~OR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test __ Location clearance __ Mechanical Integrity Test Subsequent form required 10- Original S;,gned By Approved by order of the Commission ~lvigl W. Johnston Form 10-403 Rev 06/15/88 J Approval No. ~),,~ .-,~ ~./,,,~__ %op~ove Copy ' Returned Commissioner 'Date ~//'Y/S) SUBMIT IN ~IPLICATE DS 15-8 Revised Plug and Abandon Procedure 9/2/93 This well is currently completed witha 4-1/2" slotted liner in a horizontal Zone 1 section. The original P&A procedure had planned to lay cement in the slotted liner and up to 300' above it. The coiled tubing, however, is predicted to be near its tensile strength at this depth and under cementing conditions. Approval of this revised procedure is requested: Plug and abandonment of the well by setting a through-tubing inflatable bridge plug in the 7" liner at 9500', and laying 300' minimum of cement on the plug. Since only Zone 1 will be open below the plug, zonal isolation will be achieved. The steps are as follows: 1. Notify an AOGCC representative prior to commencing plug-back operations. ,.. ~,l.~ 2. RIH with coiled tubing and set an inflatable DnogeNn the 7" liner at 9500' MD and pressure test to 1500 psi. 3.. Lay a 300' minimum balance cement on top of the bridge plug. -7-¢c ~ ~ a¢o: 4. With an AOGCC representative on location to witness the operation, the plug with slick line. 5. Rig up electric line and cut the 4-1/2" tubing in the center of a full joint near 7700' MD. 6. Circulate the well over to seawater and freeze protect well with diesel to 2O00' MD. 7. Bleed any pressure from the tubing, inner annulus and outer annulus to zero. 8. Install a back-pressure valve. Remove the well house and flowlines. Level the pad and dig out the cellar. Prepare the pad for arrival of the rig. 9. Rig will set a bridge plug in the 9-5/8" casing at +_7650' prior to milling a 50' section at 7450' and setting a kickoff cement plug. Phil G. Smith Prudhoe Bay Drilling Engineer 564-5475 RE E VED s E P - 3 199; Alaska Oil & Gas Cons. 6ommissio~ Anchorage DS15-8A Plugback Schematic Top of 7" liner @ 7300' MD Window in 9-5/8" @ 7450' MD Bridge plug @ 7650' Tubing cut @ 7700' RE E VEB S E P - 5 199~ Alaska 0il & Gas Cons. 6ommissio~ Anchorage ~TOC @ 9200' Inflatable Bridge Plug 9500' 7" Liner shoe' 10,898' 7" L-80 Liner TD @ Shoe @ 9795' 10,755' Target Displacement 2150' 4.5" Slotted Lnr TD Displacement 1270' I I STATE OF ALASKA ALAoKA OIL AND GAS CONSERVATION COMMIS$,,.,N '/--. · APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend __ Operation Shutdown__ Re-enter suspended well__ ~d<" Alter c~ing __ Repair well__ Plugging X Time extension __ Stimulate__ Change approved program __ Pull tubing__ Variance__ Perforate__ Other x Plugback for re 2. Name of Operator 5. Type of Well: 6. ARCO Alaska, Inc. Development x Exploratory __ 3. Address Strafigraphic__ 7. P. O. Box 196612, Anchorage, Alaska 99519-6612 Service__ 4. Location of well at surface 8. 1645' SNL, 1378' EWL, SEC. 22, T11N, R14E At top of productive interval 9. 355' NSL, 2489' WEL, SEC. 15, T11N, R14E At effective depth 10. At total depth 11. 1981'NSL, 1645' WEL, SEC. 15, T11N, R14E Datum elevation (DF or KB) KBE = 71' feet Unit or Properly name Prudhoe Bay Unit Well number 15-8 Permit number 84-155 APl number 50- 029-21180 Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured 11345 feet Plugs (measured) true vertical 8837 feet Effective depth: measured 11190 feet Junk (measured) true vertical 8810 feet Casing Length Size Cemented Measured depth Structural Conductor 90' 20" 370 sx PF !1 90' Surface 2468' 13-3/8" 1938 E" & 400 sx "C" 2539' Intermediate 9326' 9-5/8" 10898' Production 1830' 7" 525 sx Class "G" 10898' Liner 5-1/2" 5-1/2" Not cemented 11169' Perforation depth: measured Slotted liner from 10878'-11169' true vertical Slotted liner from 8763'-8801' Tubing (size, grade, and measured depth) 4-1/2", 12.61t, L-80 PCT @ 9127' MD RECEIVED AU G 5 0 1993 Alaska 0il & (~as Cons. Anchorage Packers and SSSV (type and measured depth) BOT 3-H packer @ 9057'MD; 4-1/2", Camco Bal-O SSSV @ 2180'MD True vertical depth 90' 2539' 8299' 8744' 8801' 13. Attachments Description summary of proposal x Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 9/15/93 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas Suspended~ Service 17. I he~.c~rtify that the foregoing is true and correct to the best of my knowledge. Signed~~~x/ ~/ ~2.~-~ TitleDrillingEngineerSupervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test__ Subsequent form required 10- ~-~ O~ Approved by order of the Commission '~rm 10-403 Rev 06/15/88 I Approval .o. ? 3 - 2 2. S Approved Copy, Returned Commissioner Date ~_~, ,-- 73 SUBMIT IN TRIPLICATE DS 15-8 Plug and Abandon Attachment DS 15-8 is scheduled for a redrill in late September. This well is currently completed with a 4-1/2" slotted liner in a horizontal section. Plug and abandonment of the well will be performed with a coiled tubing cement squeeze in the slotted liner, including two to three hundred feet of cement above the liner top at 10,878' MD. Due to the high hole angle at the proposed cement plug, wireline will be unable to reach the top of cement for plug confirmation. A 1500 psi pressure test of the well will confirm cement integrity. Other options are to tag the cement with coiled tubing, or to bring the cement up to the point where wireline could reach it (an additional 1300',_+48 bbls cement). These options were not chosen due to their relatively high cost. The proposed P&A will be as follows: 1. Notify an AOGCC representative prior to commencing plug-back operations. 2. Lay a cement plug starting from PBTD of the slotted liner. Leave the top of cement 300' above the top of the slotted liner (100' required by State). 3. With an AOGCC representative on location to witness the operation, pressure test the well to 1500 psi. 4. Rig up electric line and cut the 4-1/2" tubing in the center of a full joint near 7700' MD. 5. Circulate the well over to seawater and freeze protect well with diesel to 20O0' MD. 6. Bleed any pressure from the tubing, inner annulus and outer annulus to zero. 7. Install a back-pressure valve. Remove the well house and flowlines. Level the pad and dig out the cellar. Prepare the pad for arrival of the rig. 8. Rig will set a bridge plug in the 9-5/8" casing at _+7650' prior to milling a 50' section at 7450' and setting a kickoff cement plug. Phil G. Smith Prudhoe Bay Drilling Engineer 564-5475 RECEIVED AU G 3 0 1993 Alaska Oil & Gas Cons. uummiss~o': Anchorage DS15-8A Plugback Schematic Top of 7" liner @ 7300' MD Window in 9-5/8" @ 7450' MD Bridge plug @ 7650' Tubing cut @ 7700' AUG 3 0 3995 Oil & Gas Culls. Anchorage :::::::::::::::::::::::::: TOC @ 10,600' 7" Liner shoe: 10,898' Target Displacement 2150' 7" L-80 Liner Shoe @ 9795' TD @ 10,755' 4.5" Slotted Lnr ] TD Displacement 1270' Spud Date: 9- I6.84 Original RKB: 71' TOp of Sadlerochtt: 93..~' Maximum Hole Angle: 80s Angle Through S~.. Annulus Fluid: Dieset/10.6-~ NoCI Reference Log: CNL 10-11-84 All Depths are RKB MD to Top of Equipment. JeweAry Arco AlaskQ. Inc. * Pruahoe Bay Field APt#: ~211804Z2 Well Type: Pro~!ucer Completion Date. 10-19-64 New I~ Workover ~ Hanger Type: FMC Gen ili Hanger: 26' :2 5,6 9 8 lOT Paetcer 3.~' 13-3/8' ?2e L-80 0 9.5/8' 47~ L,.B0 0 7' 29e L-~0 ~ 5 · 18e 5-95 10678' 4.1/2' 1g_6~ L,BO 0 ! I i 1 I ! I I ! ! i ! I ! I ! I ! ! ! I I I 11 PBTD= 11190' I'D= 11345' 1C898-11109 1 ~ 8700' ~- 1lCd'MD 101~ Liner 111~' 5~ottecl Uner 9127' ~ Tub~g RECEIVED AU G 0 199, Ala$~ka 0il & Gas Cons. Cornmisslm~ Anchorage It~ Dcxle: 5-6-91 by GWj Reason: ~ ID Correction Prevto~ Revts~"~: 7-14-87 ARCO Alaska, Inc. Post Office E-"--'~.00360 Anchorage/-_ .a 99510-0360 Telephone 907 276 1215 August 10, 1993 Ms. Joan Miller Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: Outstanding Application Approvals Dear Ms. Miller: Per your 7/30/93 letter to Mr. James Cawvey, regarding the listed outstanding 10-404's (Report of Sundry Well Operations), the following summary is provided: Well 1-16: Approval # 8-988, Approved 12-28-88. Report Sundry attached covering Reperforating work. i"~-~ 2) "7ct- q.~ 3 ) '~C]. '7~, 4) Well 3-16i: Approval # 9-740, Approved 8-23-89. Report Sundry attached covering Acid Stimulation, Cement Squeeze, & Reperforating work. Well 3-16i: Approval # 91-234, Approved 8-6-91. Report Sundry covering Perforatiing work was completed & sent to AOGCC 11/91. A copy of this Report is attached. previously Well 5-18: Approval # 9-993, Approved 11-15-89. Report Sundry attached .covering Initial Perforating work. Well 5-26:~Approval # 90-060, Approved 2-1-90. The approved Stimulation work for 2/90 was never-performed. Please 'cancel:'this approval. Well 7-06:' Approval # 90-666, Approved 8-27-90. The approved Gas Shutoff work for 9/90 was never, performed. Please-cancel this approval. Well 11-2: Approval # 90-066, Approved 2-6-90. Report Sundry attached covering Tubing'Washes Reperforating work. R E C E IV E D ARCO AI~t~, lac. t~ · ~ ~ All~a~5~ ~ld C--.~mp=~' ARCO Alaska, Inc. Is a Sub$1dlar~ of Allanlic Richfield Company AU G 1 9 1995 Alaska 0il & Gas Cons. c0mrniS$~0n-' Anchorage fi/Is, Josz-t August 10, Page 2 %%~/~L~ 9) 11) Well 11-27: Approval # 9-750, Approved 8-24-89. Report Sundry covering Perforatiing work was completed & sent to AOGCC 9/89. A copy of this Report is attached. previously Well 12-25' Approval # 92-019,' Approved 2-4-92. The approved Pull Tubing work for 2/93 was never performed. Please cancel this approval. Well 15-8: Approval # 90-526, Approved'7,12-90. The approved Stimulation work for 8/90 was performed 3/91. The Report Sundry is attached. Well 15-10A: Approval # 90-463, Approved 6-19-90. The approved Pull Tubing work for 8/90 was never-performed. PleaSe cancel this approval. Well LGI-4: Approval # 90-852, Approved 12-3-90. Re: the approved Stimulation/Reperforating work for 11/90: Since this is a Lisburne Well, reconciliation of this approval will be handled by the Lisburne Operations Group. I will notify the person responsible, in the Lisburne group to handle this outstanding Report Sundry. WGI-3' Approval # 8-76, Approved 2-10-88~ Report Sundry attached covering Samulation Treatment work. Sincerely, dohn W. Peirce Engineering Aide JWP/OIO Attachments cc..¥~/J. L. Cawvey - (ARCO) - ATO- 1520 M. Sloan - (BPX) - Drilling Dept. RECEIVED AUG I 9 Alaska 0il & Gas Cons. Commission Anchorage _ STATE OF ALASKA :- - - ALASKAr'~''AND GAS CONSERVATION CE :/llSSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing . Alter casing Repair well 'Other 5. Type of Well 6. Datum of elevation(DF or KB~'~,,,~ 71 RKB fe~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1645' FNL, 1378' FWL, Sec. 22, T11N, R14E, UM At top of productive interval 355' FSL, 2489' FEL, Sec. 15, T11N, R14E, UM At effective depth At total depth 1981' FSL, 1645' FEL, Sec. 15, T11N, R14E, UM Development X Exploratory Stra~tigraphic Service RECEIVED 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-8 9. Permit number/approval number 84-155/90-526 10. APl number 50 - 029-21180 11. Field/Pool Prudhoe Bay Oil Pool AUG 1 9 199, Alaska Oil & Gas Cons. Commission Anchorage 12. Present well condition summary Total depth: measured true vertical 11345 feet 8837 feet Plugs(measured) PBTD @ 11140' MD (3/23/91) Effective depth: measured 11140 feet true vertical 8797 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 90' 20" 370 sx PF II 90' 90' Sudace 2468' 13-3/8" 1938 sx PF E & 400 sx PFC 2539' 2539' Production 9326' 9-5/8" 500 sx CIG & 300 sx PFC 9397' 8299' Liner 1830' 7" 525 sx CIG 10898' 8744' Slotted Liner 291' 5-1/2" Not cemented 11169' 8801' Perforation depth: measured Slotted liner from 10878-11169' true vertical Slotted liner from 8763-8801' Tubing (size, grade, and measured depth) 4-1/2", 12.6¢f, L-80, PCT @ 9127' MD Packers and SSSV (type and measured depth) BeT 3-H packer @ 9057' MD; 4-1/2", Camco BaI-O SSSV @ 2180' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1304 12480 0 -- 1644 18577 299 Tubing Pressure 987 1280 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations . 16. Status of well classification as: Oil X Gas. Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. qigned Title Engineering Supervisor ~'rm 10-404 Rev 06/15/88 .. Date SUBMIT IN DUPLICATE 15-8 STIMULATION TREATMENT DESCRIPTION OF WORK COMPLETED 3123191: RIH w/CT & jetted a fill cleanout down to hard bottom at 11140' MD. 3124/91: MIRU CT & PT equipment to 4000 psi. RIH w/CT & tagged bottom at 11140' MD, then reciprocated an acid stimulation treatment across the 5" slotted liner located at: 10878 - 11169' MD (ZIB) Ref. Log: CNL 10/11/84. Pumped: a) 20 bbls 1% NH4CL Water spacer, followed by b) 170 bbls Dead Crude @ 3.3 bpm to load the wellbore, followed by c) 33 bbls 1% NH4CL Water down CT @ 2.0 bpm, followed by d) 33 bbls 15% HCl w/10% Xylene @ 2.5 bpm, followed by e) Shutdown for 45 minute soak. Resumed pumping Stage I Diversion/Acid: f) 300 bbls 1% NH4Ci Water @ 3.0 bpm, followed by g) 180 bbls 1% NH4Cl Water w/foaming diverter additive, followed by h) 10 bbls 1% NH4Cl Water w/foamer @ 0.6 bpm w/N2 @ 1500 scf/min, followed by i) 33 bbls 1% NH4Cl Water @ 0.75 bpm, followed by j) 75 bbls 15% HCl w/10% Xylene @ 1.5 bpm, followed by k) 75 bbls 6% HCi - 1.5% HF @ 1.0 - 1.8 bpm, followed by Stage 2 Diversion/Acid: I) 33 bbls 1% NH4Ci Water flush down CT/Tbg annulus @ 1.9 bpm, followed by m) 35,000 scf N2 down CT, followed by n) 33 bbls 1% NH4CI Water down CT @ 2.1 bpm, followed by o) 75 bbls 15% HCl w/10% Xylene @ 1.5 bpm, followed by p) 75 bbls 6% HCl - 1.5% HF @ 1.4 - 2.0 bpm, followed by Stage 3 Diversion/Acid: q) Repeated steps I through p (above), followed by Stage 4 Diversion/Acid: r) Repeated steps ! through p (above), followed by s) 66 bbls 1% NH4Cl Water, followed by t) Shutdown. Rigged down. Flowed well. Placed well on production & obtained a valid welltest. RECEIVED A U G 1 9 199~ Alaska 0il & Gas Cons, C0mmissio~ Anchorage WALTER J. HICKEL, GOVERN 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-14.33 TELECOPY: (907) 276-7542 July 30, 1993 Mr. James L. Cawvey Engineering Supervisor ARCO Alaska Inc P.O. Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bay Unit, AOGCC Forms 10-403 and 10-404 Dear Mr. Cawvey, In making a review of well files we have found some files which contain approved Application of Sundry Approval forms (form 10-403) that have no subsequent Reports of Sundry Well Operations (form 10-404). Enclosed a list of the wells in question. To be in compliance with AS 20 AAC 25.280(d) of the Regulations, the form 10-404 is required to be filed with 30 days following completion of work. We would also appreciate notification of any canceled work So that the corresponding Application on file can be marked accordingly. Your help in directing the enclosed list to the appropriate responsible parties will be appreciated. Sincerely, Joan Miller Statistical Technician PRUDHO~ BAY - ARCO Well No. DSl-16 DS3-16 DS5-18 DS5-26 D$7-6 DSll-2 DSll-27 DS12-25 DS15-8 DSl5-10A LGI-4 WGI-3 Permit No. 78-8 79-93 89-76 89-113 78-14 81-128 86-148 83-166 84-155 88-85 88-13 79-49 Approval Date & No. 12-28-88, 8-988 8-23-89, 9-740 8-6-91, 91-234 11-15-89, 9-993 2-1-90, 90-060 8-27-90, 90-666 2-6-90, 90-066 8-24-89, 9-750 2-4-92, 92-019 7-12-90, 90=526 6-19-90, 90-463 12-3-90, 90-852 2-'10-88, 8-76 DescriDtion Perforate 12-88 Perforate 8-89 Perforate 3 Q '91 Perforate 11-15-89 - stimulate 2-90 Gas shutoff treatment 9-90 Perf., stimulate, perform CTU cement squeeze 2-90 Perforate 3 Q '89 Pull tubing 2-93 Stimulate 8-90 Pull %ubing 8-90 Stimulate, perforate 11-90 Stimulate 2-88 1. Type of Request: STATE OF ALASKA ALASI/~"OIL AND GAS CONSERVATION 'MMISSION APPLIC, rlON FOR SUNDRY APPROVA! Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Time extension Stimulate X Change approved program Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1645' FNL, 1378' FWL, Sec. 22, T11N, R14E, UM At top of productive interval 355' FSL, 2489' FEL, Sec. 15, T11N, R14E, UM At effective depth At total depth 1981' FSL, 1645' FEL, Sec. 15, T11 N, R14E, UM Plugging ~ Pull tubing Vadance 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 71 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-8 9. Permit number 84-155 10. APl number 50 - 029-21180 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11345 feet Plugs(measured) 8837 feet Effective depth: measured true vertical Casing Length Conductor 90' Sudace 2468' Production 9326' Liner 1830' Slotted Liner 291' Perforation depth: 11190 feet 8810 feet Junk(measured) Size Cemented Measured depth 20" 370 sx PF II 90' 13-3/8" 1938 sx PF 'E' & 400 sx PF 'C' 2539' 9-5/8" 500 sx CI 'G' & 300 sx PF 'C' 9397' 7" 525 sx Cl 'G' 10898' 5-1/2" Not cemented 11169' measured Slotted liner from 10878-11169' true vertical Slotted liner from 8763-8801' True vertical depth 90' 2539' 8299' 8744' 8801' RECEIVED ;JUL 1 1 1990 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 9127' MD~0jj& Packers and SSSV (type and measured depth) BOT 3-H packer @ 9057' MD; 4-1/2", Camco Bal-0 SSSV @ 2180' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation 15. Status of well classification as: ~c4c~ ~5'~ 1990 16. If proposal was verbally approved Oil x Gas Suspended Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Date FOR COMMISSION H~l= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test __ Subsequent form required 1 ~ Approved by order of the Commissioner ORIGINAL SI~NED BY. LONNIE C. $~tTH Form 10-403 Rev 06/15/88 Commissioner Approvea Returned -ql qo 71 E/IPll~l ~.~.' .I ~rm,hnr AT(")-lztTR PllIR-R'~Wt-."4 J Approval No. 0/'~.) ',~C~ Date SUBMIT IN TRIPLICATE Half-Strength Prudhoe Bay Unit DS 15-08 Mud Acid Matrix Stimulation ARCO Alaska, Inc. proposes to perform the following stimulation treatment: I. PREPARATORY WORK A. b. C. Obtain a wellhead fluid sample and perform emulsion and sludge tests RU slickline and pull SSSV. Load the following fluids: · 1300 bbls. 1% NH4Cl · 7560 gals. (180 bbls) Foaming water · 13860 gals. (330 bbls) 15% HCI-10% dispersed xylene · 12600 gals. (300 bbls) 6% HCl/1.5% HF · 320 MSCF nitrogen II. FILL CLEAN-OUT A. MIRU Transports and CTU with jetting/reverse nozzle and tubing tail Iocator. B. Pressure test BOPs, lubricator, CT and surface lines. C. Fluid pack wellbore with 300 bbls 1% NH4Cl. D. RIH with CTU, tie-in with XN-nipple at 9106' ELM. Tubing tail at 9116' ELM. E. Perform fill cleanout. III. LINER SLOT/SANDFACE CLEAN-UP A. RIH to bottom. Pump 30 bbls 15%HC1-10% dispersed xylene. B. Displace acid from CT with 1% NH4Cl. Reciprocate acid across slotted liner from 11170' MD to 11000' MD. C. Allow acid/xylene 45 minutes soak time. D. Wash liner/sand-face with undersaturated brine. IV. MUD-ACID MATRIX STIMULATION A. Load CT x tbg. annulus with 180 bbls. foaming water. B. Stimulate 1B/lA completion interval. 1. Staoe I Diversion: a. 40 bbls. 1% NH4Cl water down the CT x tba. annulus b. 100 MSCF nitrogen down the CT followed by c. 32 bbls. 1% NH4Cl water down the CT. . Stage 1 Acid: Reciprocate from 11165' to 11000' MD. Pump the following: a. 75 bbls. 15% HCI/10% dispersed xylene b. 75 bbls. 6% HC1:1.5% HF c. 32 bbls. 1% NH4Cl water Half-Strength Prudhoe Bay Unit DS 15-08 Mud Acid Matrix Stimulation 3. ~tage 2 Diversion: a. 20 bbls. 1% NH4CI water down the CT x tbo. annulus b. 50 MSCF nitrogen down the CT followed by c. 32 bbls. 1% NH4CI water down the CT. 4. Staae 2 Acid -- Reciprocate from 11165' to 11000' MD. Pump the following: a. 75 bbls. 15% HCl/10% dispersed xylene b. 75 bbls. 6% HC1:1.5% HF c. 32 bbls. 1% NH4Cl water 5. Stage 3 Diversion and Acid Repeat steps 3 and 4 above. 6. Staae 4 Diversion Repeat step 3 above. 7. Stage 4 Acid (final stage) and Overflush Reciprocate from 11165' to 11000' MD. Pump the following: a. 75 bbls. 15% HCl/10% dispersed xylene b. 75 bbls. 6% HC1:1.5% HF c. 75 bbls. 1% NH4Cl water d. displace CT with 32 bbls methanol/water e. pump remaining 1% NH4Cl water down CT x tbg. annulus. C. Begin POOH with CT, returning well to production on way out of hole. necessary, kick well off using nitrogen. D. Rig down equipment. COILED I'UB],Nt3 UNIT BOP EOU 1 PllENT 1. SOCK) PSI ?" WELLHEAD CONNECTOR FLAIqG£ 2. 5000 PSI 4 1/16" PIPE RAHS 3. 5000 PSI 4 1/6" HYD~L~ SLIPS 4. ~)00 PS1 4 1/§" ,SI'lEAR RAMS 5. ~)00 PSI 4 1/6" BLIND RAHS ~,.6.5000 PSI 4 1/16" STUFFING BOX H]RELINE BOP EOUIPMENT 1. 5000 PSI ?" WELLHEAD CONNEC10R FLANGE 2. 5000 PSI WlR£LIN£ RAlaS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. ~000 PSI 4 1/6" FLOW TUBE P^CI~-Olrlr ARCO ALASKA, INC. F'.O. BOX iG036~ ANCHORAGE, ALASKA 995~0 DATE' REFERENCE: 4-4-89 ARCO CASED HOLE FINALS -9 3-it-89 LEAK DETECTION 2-t? J-22-89 TEHP & GAMMA TIE-IN 5-i3 3-i2-89 LEAK DETECTION 6- t 2 3-25-89 COLLAR/F'ERF 6- i 4 3- i 8-89 COLLAR/PERF ?-t4 3-i2-89 LEAK DETECTION 9-i6 3-27-89 TUBING CUTTER i -24 3-t 5-89 TEMP J -24 3-J 9-89 COLLAR/PERF ~-3~ 3-i 6-89 CBT 2-32 3-i 6-89 CET _5-8 3-~ 3-89 PIT/PRODUCTION 5-25 3-ii-89 PRODUCTION PROFILE 8-i 4 3-i 7-89 F'ERF RECORD 8-i 5 3-i ?-89 PRODUCTION 8-i 5 3-i 8-89 DUAL BURST TDT-P 8-2~) 3-26-89 COLLA'R/PERF RUN i, 5" RUNS t&2, 2"&5" RUN t, 2"&5" RUN t, 5' RUN i, 5' RUN t, ':2'&5' RUN i, RUN i, 5' RUN i, 5' RUN i, R~!N i, RUN t, t/2"&5" RUN i, 5" RUN RUN ~, 5' RUN RUN 1, 5' PLEASE flGN AND RETURN THE AT.TACHED COPY AS RECEIPT OF DATA. RECEIVED BY. HAVE A NICE DAY! SALLY HOFFECKER AT0-i529 TRAN$ ~8~ APPROVED ___ DISTRIBUTION CENTRAL FILES~ CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON ~ MOBIL PHILLIPS F'B WELL FILES R & D BPX STATE OF ALASKA TEXACO CAMCO OTIS CAMCO ATLAS A'~LA$ CAMCO ATLAS CAMCO ATLAS $CH $CH $CH CAMCO $CH $CH $CH ATLAS ~i: c h o f d :':'~ I' a ,. ' ~ - '", I'" ('" I ..... ' ..' '..' . r,, ,::. ,'- ,:: R E. NCE: ARC:O .C~'.,.'-;ed Iqo Le F ~ 'ha ,. t":' '"' -,~- ,.:,-?. o.., !),.5;,. '"'~" · '- .;---- c.~ ._, .... ~..., ...,.,, ~, ~ r..'., 'F m..q I. f-.J.:-2 u. -I- 'r o'n }} r.:, c: a y -.,¢- i m e L c:, g ,5: c: h a. h '-I- t- h e d c: o p y a ~- 'F e.,.': ~-:-' } P + ;-, i': d a ~l- a ,. F'ke..'.-,q-'e .'.5:J 9r: a'r~c! 'r'e'l:-,.!'.,"'r~ : ~. a . .ac . · ...... Received By P A v El A N I C F ~') ~''' ''"' ~ Ce'nt~-aL Fi Les: Chevrnn ~o -". t?'x-t-ensjnn gxp Lo'.,-a4: i o'n Ma'fa t:. h on .~: Mob i L Phi L L ip.g F'B WeLL Fi Le~. R &. D S'.oh i o .¢_-.:tate of A-Laz..ka TE-'X 8C0 ARCO Alaska. Inc.~%~, Pos.+. Office Box 100360 Anchorage. Alaska 99510-036C Teieohone 907 276 1215 August 15, 1986 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- Conductor As-Built Location Plat - DS 15 (Wells 7-9, 11-15, 20) Dear Mr. Chatterton: Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, . Gruber Associate Engineer JG/dmr Enclosure GRU1/29 If AiasF2 Oil & Gs: '""-- "--.---.~ ,/ ;:r. LL :: 10 ]1 12 Y=59601c?.$37 x--677267. 356 LAT=70o 17' 47.455" LO,':G=I46o 33' 52.070' CELLAR BOX ELEV=29.33 ?.l RECEIVED Oil & G~s Cons. ~ommissior ¢~. ~l'l ,~ An~m~e -1 ~ Y=5959985.5 x=677294.~55 LAT=70o 17' 46.295" LONG=i48° 33' 51.~61" CELLAR BOX ELEV=29.'7 ¥=55,59569.O06 x=677321.27~' LAT=70° 17' 45.1-',?" LONG=14~° 33' 50.660' CELLAR BOX ELEV=29.4.g ¥=5.a. =e. 7c' 056 x=677348. 316 ~ LAT=70° 17' 43.9S7' ~ LONG=Ii~$° 33' 49 °5~'"~ CELLAR BOX ELEV=2°.,.67 Exist inn Y-Ce'Ceql 8 333 X=.'".77402.086 LAT=70° 17' /* 1.67'-;" LO;;G=I kS° 33' CELLAR FO;~ ELEV=2?.'-. 'f-5:'qe. 401 851 X=677~28.98b LAT=70o 17' 40.52r," LONG=I:'-~° 33' /~7.$:,2" CELLAR FOX ELEV=2~.5,3 ¥=5.".59284.513 z=..577k 56. 307 LAT=TCc 17' 39.36:~" LON" l~E-a ~'~' 47 177" CELLAR SOX-rLEV-''n-~.. '~ Y--5')59167. $56 X-- '.', 77-'~ S3.2 02 · LAT--70° 17' 38., ~1- ~'' ' 0.. I . LONG--I.,,® 33 b,E 4Z3" -CELLAP, FOX ELEV=29. 14 Y- r "~'"050 587 x, (,7751o.01o LF,T-7,:{` 17' 37.05Z" tO:;C..=148" 33' ~5.:':3" C[LLA;~ 1,.,"× ELEV:29.2~ WE-LL q-?, 11-15 ¢:'LO i[ [ I I ii i i ] ,_ Atlr..nticRichl~¢ldCompany O D ATE: NORTH AMERICAN PRODUCING DIVISION ! HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA ' ~' ~,-,D THAT THIS PLAT REPRESENTS AN AS-BUILT SURVEY MADE BY ME, AND THAT ALL DIMENSIOt~S AND OTHER DETAILS AR~ CORRECT, AS OF: _ fiS-t UI L-i- ll i DRAV,'ING No: ARCO Alaska, Inc. ~ Post Office Bo"~x-q00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 January 7, 1986 Ms. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 CEIVED Alaska 0it & Gas Cons, C0mmis$iO~ Anchorage Subject' DS 15-8 Dear Elaine' The bottomhole location listed on the DS 15-8 Well Completion Reports, dated 4-29-85 and 2-13-85, is incorrect. The correct location is as follows- 1985' FSL, 1642' FEL, Sec.15, T11N, R14E, UM Also, the total depth TVD is 8827'. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG'mh GRU13/L167 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany · . 3001 PORCUPINE DRIVE ANCHORAGE.ALASKA TEL ~.HONE ('07) 279-i433/ n :axe. Pemit No. ., . ALASKA OIL AND 8A$ GONSEI~¥ATION.GOMMIS$10N DATE: TO: RE :' We wish to bring to your attention that the Commission has nor- yet received the following required items on the subject well which our records indicated was completed /~*'-o2/--~, . ~£C£i !/£D. ' ~//I· . "'~Oorage C°~rnis~io0 Article 536(b) off Tit~'{ 20, Chap~e~ 25, A~aska Adminis~raCive Code, stipulates that affce~ completion o~ a d~i~ed-we~. Please submit the above missing material. erelZ C. V. Chatteruon/ Chairman lc': C. 02~ '~ n-{O x'"'/'n Iq-fi-/o ~d /I.~'"'il ............. .3 ALASKA 011. A#D 8A$ GOtlSEIIFAI'IOII.GOMMI$$1011 /...' . $ool PORCUPINE DRIVE '-' ANCHORAGE.ALASKA gg$014-3192 TELEPHONE(907) RE: Well We wish to bring to your attention that the Commission has no~i' yet received the following required items on the subject well which our records indicated was completed_ /~-~/--~.~ Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 days after completion-of a drilled.well. Please submit the above missing material. Chairman lc:C.024 . Los. ~~C,.'/~ ~1/~ R 1~~ ~~., ' · 14e ~t~h to bril~g to your n~e~on ~[~a~ ~he yet received the folto~tt~g required ~tem8 on ~he.oubJee~ ~elI-. ' which our records indiea~ed was completed_/~-~/-~ . Article 536(b) of Title 20, Chapter 25, Alaska Admini~traEtve Code, ~tipulate~ Eha~ chis material ollall be filed wiEhtn 30 daya after completion of a drilled.well. Please submit the above mio~tng material. C. V'. Ch~l:erO'on/ Chairman lc~C.024 ARCO Alaska, Inc. Post Office Bb~-~00360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: July 18, 1985 Reference: ARCO Pressure Data with Analysis 15-8 Flowing Gradient 6-20-85 Otis pl~~~ siln as receipt of data° REceived para Lambert ATO 1429C Trans 218 Alaska 0ii & Gas Cons. commission Anchorage Chevron Expl. Services Ext. Exploration Marathon PB Well Files ;S~ca~er~f -~ska T~aco · ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldComparty ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska gg510 Telephone 907 276 1215 Date' July 10, 1985 Reference' ARCO Pressure Survey 15-8 PBU 6-22-85 Otis ~ sign ~ receipt of data. Received Pam Lambert _ ATO 1429C Trans 202 Alaska Oil & Gas Cons, Commission Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, Inc. Post Office 8ox 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date' July 10, 1~85 Reference- ARCO Directional Survey 4-32 MWD Directional Survey 4-24-85 Teleco ~.~lS~8~Magnetic Directional Survey 10-15-84 Teleco 17-13 Magnetic Directional Survey 2-14-85 .Teleco ~P~ease sign as receipt of data. ReCeived by Pam Lambert ATO 1429C Trans 206 Chevron D & M Phillips Expl. SerVices PB Well Files Ext. Exploration R & D Exxon' Sohio Marathon State of Alaska Mobil Texaco ARCO &lalka. Inc.. Post Office Box 100360 Anct~orage. Alaska 99510 Teiel~hOne 907 276 1215 Date' June 21, 1985 ~ · Reference: ARCO Pressure Data . t 6-7/Static Gradient 4-28-85 Camco 9-6 JPBU 5-24/25'85 DA 12-25 ?FO 5-22-85 Camco 14- 35 q~BU 5- 31-85 Camco 14-35~Flowing Gradient 5-30/31-85 Camco 15- ~Z~ PBU 9-11-84 sS 15,7/PBU .9-11-84 SS 15-8 ?PBU' 2-29-84 . SS 15-8 '?PBU 10-20-84 SS 15-8 ~PBU 10-20-84 SS 17-5 'PBU 5-29-85 Camco Alaska 0ii & Ga5 C~n~, ~emm[ssion Ancho:age Pam Lambert ATO 1429C .Trans 176 .- . Chevron D& M Expl.. Services Ext. 'Exploration Exxon Marathon Mobil Phillips PB Well Files R & D Sohio State'of Alaska Texaco ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telept~one 907 276 1215 Date: May 9, 1985 Reference: ARCO CH Finals 5-17~/ PDK 100 Gamma Ray-CCL 4-18-85 Run 1 5" DA 9-28~"Gamma Ray in Casing 4-20-85 1 5" GO · 12-11~ PDK 100 Gamma Ray-CCL 4-17-85 1 5" DA 15'~8~¥!, CBL 10-11-84 1 5" ' Sch 9-27~ CBL 4-1-85 1 5" Sch Please sign and return as Received by Pam Lambert ATO 1429C Tn ans. (~..~ Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, Inc. " ~ Post Office Box i~00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 1, 1985 .. Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Well Completion Reports Dear Mr. Chatterton' Enclosed are Well Completion Reports for the following wells' DS 6-11 DS 15-8 2D-14 · If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU6/L68 Enclosures RECEIVED MAY 0 1985 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRIchlieldCompany STATE OF ALASKA ALASKA..~..~_ AND GAS CONSERVATION CC_~IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~(x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] · 2. Name Of Operator 7. Permit Number ARCO Alaska, Inc. 84-155 , , , 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK ;99510 50- ' -029-21180 4. Location of well at surface 9. Unit or Lease Name 1645' FNL, 1378' FWL, Se¢.22, T11N, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 355' FSL, 2489' FEL, sec.15, TllN, R14E, UM . .~ , 15-8 At Total Depth : 11. Field and Pool 1981' FSL, 1645' FEL, Sec.15, T11N, R14E, UM Prudhoe Bay Field · 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 71' RKB ~I ADL:28306 12. Date Spudded09/16/84 13. Date T.D. Reachedl 0/01/84 14: Date C°mp" Susp' °r Aband' I 15' Water Depth' if °ffsh°re I 16: N°' °f C°mpleti°nsl 0/21/84 N/A feet MSL 1 I ' 17. Total Depth (MD+TVD) 18. Plug Back Depth (ME:H--I~/D) 19: Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 11,345'MD,8837'TVD' 11190'HD, 8810'TVD YES I~X.r .... NO [] 2174 feetMD 1900' (Approx) 22. Type Electric or Other Logs Run. D I L/LDT/CNL/GR, CET/CNL/GR, CET/CNL/CBL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 90' 30" 370 sx PF II 13-3/8'' 72.0# L-80 Surf 2539' 17-1/2" 1938 sx PF "E" + 400 sx pF "C- 9-5/8" 47.0# L-80 Surf 9397' 12-1/4" 500 sx Class "G" + 300 ~x PF "C" 7" 29.0# L-80 9068' 10898' 8-1/2" 325 sx Class "G" + 200 ;x Class "G" 5" slottE~d lnr 18. # S-95 10878' 11169' 8-1/2" Not cmtd~ pkr set ~ 10~[~78' , 24. Perforations open to Production (MD+TVD 0f Top and BottOm and 25.- TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5" slotted liner f/11,169' - 10,882' 4-1/2" 9127' 8994' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A - 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 12/11/84I F1 owl ng Date of Test Rours Tested PRODUCTION FOR el L-BBL GAS-MCF WATER-BBL CHOKE sIZE [ GAS-OIL RATIO 01/03/85 9.1 TESTPERIOD I~ 659.4 612.7 0 66°I 929 scf/STl~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF wATER-BBL OIL GRAVITY-APl (corr) Press. 330 N/A 24-HOUR RATE ~ 1739 1616 0 29.0 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED MAY o 985 · , Form 10-407 GRU6/WC19 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. : 30;: :-: . ~i~ : GEOLOGIC MARKERS ': '- .... ~ ' "FORMATION TEs~-s - ' · ' NAME Include interval tested, pressure data; all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochit 9424' 8313' DST RESULTS: GOC not avai 1 abl E Base Sadlerochit 11,170' 8807' Zone 1: 10,882' - 11,166'MD : Initial flow - 4 minutes Initial SI - 1 hour Second floW - 10.5 hrs. to atmospheric: (white elephant) 10.0 hfs to common line produced 2040 STB/D @ 765 GOR:avg,~' _- -- '' Final SI = 5 hours; avg 480± FTP ' Total Produced Fluids: - 1200 bbls oil over 20,5 hfs (second flow 'period) Cravity (to white elephant): 24° APl @ 45°F Final buil dup analysi s: P '~ 3907 . .. 31. LIST OF ATTACHMENTS None - 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ '~ - Title Associate Engi,eer Date -. INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. . Item 16 and 24: If this well is completed for separate pr_oduction from more. than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records fOr this well should show the details of any multiple stage cement- lng and the location of the cementing tool. k Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none'' Form 10-407 ARCO ALASKA INC. Drill Site 15-8 Prudhoe Bay Field North Slope Borough, Alaska ~aska Oil & Ga~ Cor;s. Anchorede Co~';znission THE ANALYSTS / ARCO DS 15-8 END OF WELL REPORT- INDEX 1. WELL SPECIFICATIONS 2. SERVICES PROVIDED 3. DAILY DRILLING SUMMARY 4. BIT RUN SUMMARY 5. FORMATION DESCRIPTIONS 6. SHOW REPORT SUMMARY 7. DIRECTIONAL SURVEYS BIT RECORD 9. MUD RECORD 10 THE ANALYSTS LOGS PROVIDED 11. THE ANALYSTS PERSONNEL 12. SUMMARY ' 13. FINAL LOG PRINTS (OPTIONAL) THE ANALYSTS 1. WELL SPECIFICATIONS OPERATOR: Arco Oil WELL NAME: Drill Site & Gas Company 15-8 LOCATION: Prudhoe Bay COUNTY: North Slope B~rough STATE: Alaska SPUD DATE: 9-16-84 TOTAL DEPTH DATE: 10-1- 84 INTERVAL LOGGED: DATES LOGGED: TOTAL DEPTH, FEET: DRILLING CONTRACTOR: RIG NAME: 9176 RKB: _ WATER DEPTH: CASING RECORD: MUD COMPANY: MUD TYPES: Fmm 9423' to 11345' From 9-26-84 to 10-1-84 Measured: 11345' Feet TVD: Feet Parker Drilling Company 9 5/8" inch to inch to inch to inch to Ligno sulphonate Brine TYPE OF LOGGING SERVICE: Well Logging (WL) IDEL Data Package Total Concept (TC) Measurements While Drilling (MWD) THE ANALYSTS SERVICE CENTER: THE ANALYSTS LOGGING UNIT #: Anchorage, 003 from from from from from Alaska 9397' to 9433 to 11345 to 9423' 9423' tO to to to to 11345' 11345' THE ANALYSTS 2. SERVICES PROV ~D DEPTH PRIMARY SERVICES FROM TO CONVENTIONAL WELL LOGGING 9423 ' 11345 ' IDEL 9423 ' 11345' DATA PACKAGE TOTAL CONCEPT MEASUREMENTS WHILE DRILLING- DIRECTIONAL SURVEY SERVICE MEASUREMENTS WHILE DRILLING-DIRECTIONAL LOGGING SERVICE iMEASUREMENTS WHILE DRILLING -- FORMATION LOGGING SERVICE /' 2. SERVICES PRO¥ ;D SERVICE DEPTH FROM TO CONVENTIONAL WELL LOGGING Drilling Rate - 9,423 11,345 Lithology Interpretation and Description 9,423 11,345 Oil Fluorescence 9,423 11,345 Formation Density .... Total Gas Content of Drilling Fluid 9,423 11,345 Chromatographic Analysis of Drilling Fluid Gases 9,423 11,345 Trip Gas Notation 9,423 11,345 Connection Gas Notation 9,423 11,345 Pump Strokes Monitor 9,423 11,345 Drilling Mud Properties 9,423 1]., 345 Pit Volume and Flow Rate Monitor of Rig System .... Pressure Evaluation Profile (PEP) Log 9,423 11,345 Physical Formation Log (PFL) 9,423 1.1., 345 End of Well Report (EWR) 9,423 11,345 IDEL SERVICE Drilling Porosity 9,423 11,345 Formation Pore Pressure 9,423 11,345 Rate of Penetration 9,423 11,345 Weight on Bit 9,423 ll, 345 Rotary RPM 9,423 11,345 Cumulative Drilling Hours 9,423 11,345 Operational Cost Per Foot 9,423 11,345 Drill Bit Bearing Condition 9,423 1.1,345 Total Gas Content of Drilling Fluid 9,423 11,345 Pit Volume and Flow Rate Monitor of Rig System .... Pressure Evaluation Profile (PEP) Log 9,423 11,345 Instantaneous Drilling Evaluation Log (IDEL) 9,423 11,345 End of Well Report (EWR) 9,423 11,345 DATA PACKAGE Depth Rate of Penetration Weight on Bit Rotary RPM "D" Exponent Pump Strokes Mud Flow In Mud Flow Out Pump Pressure Pit Volume % Gas Temperature Out THE ANALYSTS ALASI~A OIL AND OAS RE: Bill Sheflleld, Governor 3001 PORCUPINE DRIVE ANCHORAGE.ALABKA gO$Of'f-3f g:S TELEPIIONE(O01) 21g-1433 We wish to bring to your attention that the Commission has noG-- yet received the following required items on the subject well which our records indicated was completed -//3-~/--~/ Article 536(b) of Title 20, Chapter 25, Alaska Administrative Code, stipulates that this material shall be filed within 30 days after completion of a drilled.well. Please submit the above missing material. · · erely. C. V. Chattertfon/ Chairman lc..C.024 .....Y)ATF- Apr i REFERENCE' ARCO Open HoLe Final. Dat'a 9-26-84 9--26--84 Mud Log Aha L y$ t' '_-,'/I D,z:_ AnaLys.i~/E'nd of We~[ Report Sch S'ch J ret: ur n '{'he a !"?ached copy as. rece [ p'~ of data. Received By .... ,,t-'AVE A ,,NIICE DAY'. l<eL Ly McF'arl. and ATO-i 4.°°F_, TRAN$, ~078 I) ISTRIBUT]]ON FiLe~ 2. SERVICES PROVIL_.~J (Continued) SERVICE DEPTH FROM TO TOTAL CONCEPT All Conventional Well Logging., DATA PACKAGE, and IDEL Services Engineering Programs --Trip Monitor Including Swab/Surge Calculation -- Hydraulics Analysis & Optimization -- Fracture Gradient & Kick Tolerance -- Kill -- Corrected "d" Exponent Calculation -- Gas Cut -- Hole Size -- Wellsite Status Report MEASUREMENTS WHILE DRILLING DIRECTIONAL SURVEY SERVICE Borehole Drift on Demand Borehole Azimuth on Demand Continuous Magnetic Tool Face Continuous Gravity Tool Face MEASUREMENTS WHILE DRILLING DIRECTIONAL LOGGING SERVICE Borehole Drift on Demand Borehole Azimuth on Demand Continuous Magnetic Tool Face Continuous Gravity Tool Face Natural Formation Radioactivity (Gamma Ray) MEASUREMENTS WHILE DRILLING FORMATION LOGGING SERVICE Formation Resistivity Natural Formation Radioactivity (Gamma Ray) Annular Temperature Downhole Weight on Bit Downhole Torque on Bit Borehole Drift on Demand Borehole Azimuth on Demand THE ANALYSTS 2. SERVICES PROVI/-~) (Continued) DEPTH OPTIONAL SERVICES FROM TO Pump Pressure Casing Pressure Pit Volume Mud Flow Out Mud Density In Mud Density Out Mud Temperature In Total Revolutions of Bit on Bottom Rotary Torque Continuous Delta Chloride Telecopier Ambient Air H2S Detection (qty = ) Drilling Fluid H2S Detection- Mud Duck Carbon Dioxide Detector Flame Ionization Detector Remote Video Display (qty = ) Trip Monitor Engineering Programs Hydraulics Analysis & Optimization XXXXXXXXX XXXXXXXXX Fracture Gradient & Kick Tolerance XXXXXXXXX XXXXXXXXX Kill XXXXXXXXX XXXXXXXXX Corrected d-Exponent XXXXXXXXX XXXXXXXXX Survey 'i'VD XXXXXXXXX XXXXXXXXX Stuck XXXXXXXXX XXXXXXXXX Gas Cut XXXXXXXXX ' XXXXXXXXX Hole Size XXXXXXXXX ! XXXXXXXXX Wellsite Status Report XXXXXXXXX XXXXXXXXX Additional Services (list) XXXXXXXXX XXXXXXXXX 2. SERVICES PROVI~'~-~' (Continued) SAMPLES , SHIPPED TO TYPE QUANTITY INTERVAL Taken by Wellsite Geologists Dry 1 20' REPORTS TYPE FREQUENCY DISTRIBUTED TO LOG DISTRIBUTION TYPE COMPANY/NAME QUANTITY On location to wellsite geologist~ DAILY FINAL 3. DALLY DRILLING ~MMARY FOOTAGE AVE ROP REMARKS DATE DEPTH~IME DRILLED OPERATION WHILEDRLG 9-26 --- 9-27 9443' 0600 20' Drlg 910 140'/hr. Shublik/Sadlerochi~ 9-28 10,053' 609' Drlg 911 ll0'/hr. Sadlerochit 9-29 10,766 0600 713' Drlg ~12 90. r/hr. Sadlerochit 9-30 11,060 294' Trip in hole-RRgl~ 120'/hr. Sadlerochit [0-1 11,345 285' Trip out ¢~f 15'/hr Basement hole to E- ' log . . THE ANALYSTS 4. BIT RUN SUMMARY Bit ~10 Drilled from 9423' to 9551'. This Smith F2 (extended nozzle) drilled at an average ROP of 100 ft/hr until a substantial increase in torque forced a trip out of the hole. The ROP dropped to 15 ft/hr before the trip was made. The casing shoe may have played some role in the torqueing. The bit was pulled in very good shape. T1/B2/GIN Bit 911 Drilled from 9551' to 10,1~0'. Another Smith F2 (extended noZzle) drilled at ROP's between 50 ft/hr and 200 ft/hr, averaging over 100 ft/hr for the 609 feet drilled. The gas increased primarily due to the increased ROP. As the conglomerates below 9700' were drilled, the fractured cherts were the primary cause of the trip at 10,160'. All drilling parameters went smoothly with the~bit coming out well used. T6/B5/G 1/4. Bit 912 Drilled from 10,160' to 10,982'. The last Smith F2 drilled well at an average of 90 ft/hr as the oil leg of the well was reached. Drill- ing went smoothly and the trip out was to change the bottom hole assembly for directional reasons. The bit was pulled in good shape. T2/B2/G 1/16. Bit 913 Drilled from 10,982' to 11,060'. A Reed FP51A was run into the hole~-a bit cOmparable to an F2, but without the extended nozzles. A decrease in efficiency of 20% was expected. The bit was only on bottom a short time when a downhole MWD tool failure ~caused the trip to put a new tool in the string. Bit 913 Rerun. Drilled from 11,060' to 11,345~. The sands began decreasing on this run and silty shales were encountered with the apparent basement being reached just below 11,165. One hundred eighty feet of basement were drilled to' ensure we were indeed out of the Sadleroch~t After 363' the bit still came out in good shape. T2/B2/GIN. THE ANALYSTS 5. SAMPLE DESCRIPTIONS 9523' - 9443' Shublik FM. Predominantly siltstone, gray- brown to brown, soft-firm, slightly cal- careous, argillaceous, slightly-very micro- pryritic, some poor laminations. 9443' - '9700' Sadlerochit FM. 80% sandstone, clear white light brown translucent, medium-very coarse, subround-angular, moderately well sorted, quartz-chalcedony over-growth, quartz, chert and lithic fragments, micropyritic, abundant oil flour, stain and cut. 20% siltstone. Gray-dark gray, soft-firm, blocky, arenaceous, occasionally grading to silty sandstone, carbonaceous material throughout, micropyritic. 9700' - 10220' 80% conglomerate. Light brown-brown, tan, clear, gray-black~, very coarse'medium grain, angular, abundant conohoidal fractures, poor-moderately well sorted, unconsolidated, TR silaceous cement, quartz, chert and quartz replaced shale, common microfractures. "10~ Sand. Clear frosted, medium-coarse grain, subangular, moderately well sorted, unconsolidated, lithic fragments, abundant chert and quartz. 10% shale (10050' - 10320'). Light brown, very soft, amorphous-subblocky, soluble, non-calcareous, silty, trace very fine carbonaceous particles, SME grading silica replacement. 10,270 - 10,750~ 50% conglomerate. Light brown clear buff gray-black, very coarse medium, angular, poorly sorted, predominantly unconsolidated, trace silaceous cement, chert quartz pyrite. 40% sandstone. Light brown clear, fine- medium grain, angular-subangular, moderately well sorted, firm-moderately hard, silaceous cement, some unconsolidated, predominantly quartz, some lithic fragments, silica over- growth. THE ANALYSTS 5. SAMPLE DESCRIPTIONS (continued) 10,270' - 10,750' 10% shale. Light brown, soft, amorphous- (continued) subblocky, soluble clay in part, silty, slightly carbonaceous material throughout micropyritic, trace grading to very arenaceous and silica replacement. 10,750' - 11,170' 80% sandstone. Brown-clear, very fine- medium grain, angular subround, moderately well sorted firm, silaceous cement, some unconsolidated, predominantly quartz, occasional chert fragments,..~micropyritic, some very silty. 10% shale. Medium-light gray, gray/black, very soft-occasionally firm, amorphous- subpissle, some soluble clay, carbonaceous material throughout, micropyritic, slightly silty. 10%-siltstone. Dark-light brown, soft, blocky-amorphous, slightly arenaceous, trace microfossils, silica replacement. 11,170' - 11,345' 70% siltstone. Gray/brown-dark gray/brown, Total Depth dark gray-gray, soft-firm, amorphous- blocky trace fissle, slightly calcareous, some arenaceous, some recrystallization, argillaceous/chert matrix, carbonaceous material throughout. 30% shale. Gray/brown-brown, very soft, amorphous, soluble, slightly silty-occasion- ally very fine'sand grains, micropyritic, some apparent microfossil shading, clay in part. THE ANALYSTS 6. SHOW REPORT S MARY See logs and attached show reports for detailed examination and/or evaluation of show interval. SHOW INTERVAL SHOW # SHOW VALUE SHOW TYPE FROM TO 1 1033 0 ~ 103 90 ~ 2 ~as/oil 2 10660-' 10.680' 4 O£1/~as 3 10820' 10870' ' 4 Oil/gas Fluo_rescence e3~countered throughou~. the Sadleroc]~it. These zones represent whatl appeared ko be the host producibl.~ zones based on gas content, sample~f.lu~.rescenc=_ and porosity. THE ANALYSTS 7. DIRECTIONAL S~'~¥EYS DATE TIME DEPTH, ~ DRI~ ~IMUTH SURVEY SURVEY TAKEN M~SURED ND COMPANY ~PE ~28 4 min ~684 8427 65,-~ N34E Teleco MWD 9-28 4 min 9778 8463 68 32 Teleco MWD 9-28 4 min 9872 8497 70.3 30 Teleco MWD 9-28 4 min 9966 8526 73 27 Teleco MWD 9-29 4 min 1.0062 8552 75.8 27 Teleco MWD 9-29 4 min 10274 8602 77.3 26 Teleco MWD 9-29 4 min 10365 8622 77.3 25 Teleco MWD · 9-29 4 min 10459 8442 77.3 24 Teleco MWD 9-30 4 min 10642 8684 76.6 24 Teleco MWD 9-30 4 min 10740 8707 75.8 23 Teleco .MWD 9-30 .4 min 10896 8744 76.4 21 Teleco MWD 10-1 4 min 11088 8786 78.8 21 Teleco M~ 10-1 4 min 11178 8802 80.2 23 Teleco MWD THE ANALYSTS BIT RECORD 9313' Collar 9397 ' Shoe JET DEPTH INTERVAL DRLD AVG. CUM. AVG. AVG. AVG. MUD BIT COND. NO. SIZE MFG. TYPE SIZES OUT FEET HOURS ROP DRLG. WOB RPM SPP ...... HRS. WT VIS WL T B G OTHER .... 10 8½" STC F2 11-11-9 955~' 128' 5½ 1 2 IN Rathole 11 8½" STC F2 11-11-9 10160' 609' 9½ 6 5 ~4 ,, 12 8½" STC F2 11-11-9 10982'822' 11½ 2 2 1/15 13 8½" Reed FP51A 11-11-9 11060 78' 2 ISIC 13 8½" Ree¢ ~FP51A 11-11-9 11345',285' 18½ 2 2 I ..... , , , , ,,, THE ANALYSTS 9. MUD RECORD (Continued) PLASTIC DATE TYPE MEASURED DENSITY VISCOSITY VISCOSITY YIELD WATER PH CHLORIDES SAND DEPTH PPG SECONDS CENTIPOISE POINT LOSS CONTENT 9-26 9-27 B~.ide-Ss~l (Drine} 9443 10.4 42 11 19 8.5 10,.5 189K 0 9-28 ,, 10053 10.4 43 10 19. 9,0 9.0 180K ¼ 9-29 " 10766 10.4 46 11 23 8,5 8.5 188K ¼ 9-30 ,, 11060 10.6+ 43 12 21 9,0 9.0 .182K 10-1 Bridge- 11345 10.7 43 12 25 9.2 8.5 l18K ½ Sal Information obtained from report by Mud Engineer on rig. THE ANALYSTS 10. THE ANALYSTS JGS PROVIDED DEPTH INTERVAL TYPE FROM TO PHYSICAL FORMATIOI~ LOG (PFL) 1" MD 1" TVD 2" MD 9423 ' 11345 F' TVD 5" MD 5" TVD 5" Zones of Interest MD 5" Zones of Interest TVD INSTANTANEOUS DRILLING EVALUATION LOG (IDEL) 1" MD 1" TVD 2" MD 9_42.3 ' 11345 2" TVD PRESSURE EVALUATION PROFILE (PEP) 1 "/1000 'I'VD 1 "/100 TVD MEASUREMENTS WHILE DRILLING (MWD) 1" MD 1" TVD 2" MD 2" TVD 5" MD . , , THE ANALYSTS 11. THE ANALYSTS :~SONNEL NAME TITLE Rob Roderick Total Concept Un~.t Manager Rob Cushing Wail Logging Unit Manager THE ANALYSTS 12. SUMMARY The oil/gas contact was picked at 10,660 feet due to the distinct increase in brilliant abundant oil fluorescence. The high gas influx into the hole before the mud weight was increased mad~ establishing a methane to heavy- hydrocarbon ratio~.~ impossible. Connection gases were high and made exact determination Of formation gas at the bit questionable. The IDEL Program (Instantaneous Drilling Evaluation Log) was able to clearly distinguish the sand from the shale sequences and successfully recognized a shale-sand sequence at the base of the Sadlerochit. Its ratty nature and thin shale lenses made detection with the Teleco Gamma Tool difficult. The fact that these lenses were being penetrated at such a severe angle could account for the difficulty in detecting the lenses with a Gamma Ray tool. The sands immediately above and below the shales seemed to overshadow the density of the shales with their porosity. An advantage of The Analysts IDEL Drilling Porosity program is that it looks at each foot separately asl.it is drilled and calculates the values. THE ANALYSTS ARCO ALaska, Inc,. P.O~ Box i06,360 Anchorage, ALaska DATF' Apri L REFERENCE · 8, L ARCO Ca.s'ed Hole FinaLs' 4--85 5-85 i e-2i-.84 --:. -,, . ~.~. , -84 '') o R.~ .~. ::: -' .... -- i i -84 i i -84 i 4-84 I ¢--i 4.-84 CoLLar/Perf Log CoLLar/F'erf I_og CCL/Perf Record EF'I_ EI::'L - CH CNI_ CET Tempera +. ute l._og ,CL.,,Fe, f Record ... I l e: i g a'nd :' .' as'~ .? n r e .1: u i" Ii '? h e a'i:.-.l:ached ,::opy a.s' rec:e i p t:. o'1'- d a 'f a, HAVE A NICE mr~ c:,:od~ Ke [ I.¥ Mc:Far l. and"~a~,a 0ii & Gas Cons. ATO- i 429F A~,-' ...... D I ~':. l RIBUTION Ch evi- Oil EXp [orat ion Serv i ce_~.' [-:xten.sion Expl. oration Exxon Marathon Mob i I Mol) il E & F' Phi I l i p.~ F'rudhoe Bay Wel. t. R & D $oh ia o*" '' Texaco Fi Les ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Harch 14, 1985 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-8 Dear Mr. Chatterton' Enclosed are the Revised Well survey for the subject well. call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU5/L25 Enclosures Completion Report and gyroscopic If you have any questions, please RECEIVED 1 8 1985 Alaska Oii & Gas Cons. Commission Anchor~oe ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA AND GAS CONSERVATION CC~ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,. Status of Well Classification of Service Well REV I sED OIL C~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] . , . . .... ... ....... 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-155 ,., · _ 3. Addre;s-" 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21180 ~. Location of well at surface 9, unit or Lease Name 1645' FNL, 1378' FWL~ Sec.22, T11N, R14E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 355' FSL, 2489' FEL, Sec.15, T11N, R14E, UM 15-8 At Total Depth 11. Field and Pool 1985' FSL, 1642~ FEL, Sec.15, T11N, R14E, UM. _. . -~ Prudhoe BaY Field I-6. Designation and serial No. 5. Elevation in feet {indicate KB, DF, etc.} Lease Prudhoe Bay 0i I Pool 71 ' RKB ADL 28306 12. Date Spudded' 13. Date-T.D. Reached 14. Da~e~omp.,Susp. orAband. JlE. WaterDepth~i'0ffs'hore ,16. N~).ofCompl'~tions 09/16/84 10/01/8# 10/21/84J JN/A feet MSL 1. 17. TotalDeptl~(l~D+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey J :~O. Depth where SSSV set ] 21.Thickr~essofPermaf~ost 11,345'MD,8827'TVD 11190'MD, 8800'TVD YES [~ NO [] 2174 feetMD 1900' (Approx) 22. Type Electric or Other Logs Run D IL/LDT/CNL/GR~ CET/CNL/GR~ CET/C_NL/CBL/_GR, Gyro 2~. CASING, LINER AND cEMENTING R'ECORD .... . SETTING DEPTH MD CASING SIZE WT, PER FT. GRADE TOP BOTTOM J HOLE.SlZ. E. CEMENT. IN_G RECORD iAMOUNTPULLED 20" 91..5# H-40 Surf 90' 30" 370 sx PF II 1.3-3/8". 72.0# L-80 Sqrf 2559' ' 17-1/2" i938 sx PF "E" + '400 s× PF 9-5/8" 47.0~ L-80 Surf 9397' 12-1/4" 500 sx Class "C" + 300 ix PF "C" .. 7" 29.0# L-80 .9.0.68' 10898' 8-1/2'.' 32.5 sx_Clas$ "G" + 200 ;x Class "C" _ 5" slott.,!d 1hr 18.(i# 5-95 10878' 11169' 8-1/2" Not cmtd~ pkr set. (~ 10;~7~' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) 'Size -DEPTH SET (MD) PACKER SET (MD)' 5" slotted liner f/11~169' - 10,882' .4-1/2". 9177~ 26. ' '- ACID, FRAcTURE, CEME~ITSQuEEzE, ETC. DEPTH INTERVAL (MD) AMOUNT &KIND OF MATERIAL USED N/A · ..... 27. PRODUCTION TEST , , Date First Production Met-hod of Operation (Flowing, gas lift, etc.) 12/11/84 F1 owing Date of Test Hours Tested IP~ODUCTION FOR oIL'-BBL GAS-MCF WATER-B'BL cHo'~'E SIZE GAS-OIL RATIO 01/03/85 9.1 TESTPERIOD IJ~ 659.4 612.7 0 6F;° 929 scf/$TB -- Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL lOlL GRAVITY-APl (corr) Press. 330 _ N/A . 24-HOU? .RATE J~ .173.9 .1..616 0 , 29-0 ...... 28. CORE DATA ........ Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None ~ , ::. !-.?h; ?-. L-:.' ..... 1' Form 10-407 JHM/WC40 Rev. 7-1-80 submit in duplicate CONTINUED ON REVERSE SIDE 29. ~"~"' 30. - - '~'""" ' GEOLOGIC MARKERs :- :' ' ~ ' ' :~ ..... : ' FORMATION TESTS · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUEVERT. DEPTH : GOR, and time of each phase. Top Sadl erochi t 9424' 8313 ' NONE G0C not available Base Sadlerochit 11,170' 8797' 31. LIST OF ATTACHMENTS We]] History, Revised C-¥.-eseep-:e Surve), (2 eepies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Assooiate E.gi.eer Signed ~ _ Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate productiOn from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 AtlanticRichfieldCompany Daily Well History-Initial Report Instructions: Prepare and submit the "Initial Rel~ort" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dales only. District Alaska County or Parish Field Lease or Unit Prudhoe Bay Unit Auth. or W.O. no. T t e AFE 303992 I State North Slope Borough Alaska Well no. ADL #28306 15-8 Drill, Complete & Perforate Parker #176 API 50-029-21180 Operator A.R.Co's W.I. ARCO Alaska, Inc. 21.66% Spudded or W.O. begun IDate Hour Prior status if a W.O. Spudded I 9/16/84 0545 Hrs. Dale and depth Complete record for each day reported as of 8:00 a.m. 9/17/84 9/18/84 9/19/84 9/20/84 9/21/84 20" @ 90' 2560', (2480'), Rn'g 13-3/8" csg Wt. 9.6, Vis 140, PV 10, YP 50, PH 9, WL NC, Sol 9 Accept rig @ 0230 hrs, 9/16/84. NU 20" diverter sys. Spud well @ 0545 hrs, 9/16/84. Drl 17½" hole to 2560', CBU, 6 std short trip, POH. RU to rn 13-3/8" csg. 2500', 1/2°, S89-1/2E 13-3/8" @ 2539' 2559' (corrected), DO FC Rn 65 its, 13-3/8", 72#, L-80 BTC csg & lnd w/FS @ 2539', FC @ 2457'. Cmt w/1938 sx PF "E" w/.12% HR-15, followed w/400 sx PF "C". Displ using rig pmp. CIP @ 1401 hrs, 7/17/84. ND diverter, NU & tst BOPE to 5000 psi. RIH w/12¼" BHA, tag FC @ 2459', tst csg to 1500 psi. DO FC. 13-3/8" @ 2539' 5560', (3001'), POH DO cmt, FC, FS + 10' new formation. Conduct formation tst to 11.2 ppg EMW. Drl & surv 12¼" hole to 5560', CBU, POH f/KO BHA. 5488', .4°, S80W, 5487 TVD, -1.4 VS, 9N, 13W 13-3/8" @ 2539' 6102', (542'), POH RIH, Navi-Drl & surv 12¼" hole to 6102', POH f/BHA. 5642', 3.3°, N48E, 5642 TVD, --, 13.94N, 15.25W 6008', 16.2°, N39E, 6002 TVD, 64.4 VS, 61.57N, 27.25E 13-3/8" @ 2539' 6586', (484'), POH PU BHA, RIH, drl & surv 12¼" hole to 6586'. 6276', 20.2°, N33E, 6256 TVD, 148 VS, 129N, 76E 6491', 25.7°, N35E, 6454 TVD, 231VS, 199N, 123E RECFi' ,: Alaska. OJi & Gas Ancharage The above is correct Signature . n ~'~d d'~isl' ~._. ~' o For form p p ibution, ~ re aratlo r see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Date Title 10/15/84 Drilling Superintendent AR3B-459-1-B Number all daily well history forms consecutively as Ihey are prepared for each well. iP~ge no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number aH drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until complebon. District Field Alaska I County or Parish [Slate North Slope Borough ILease ADL #28306 or Unit Alaska Prudhoe Bay Unit Well no. 15-8 Date and deptll as of 8:00 a.m. 9/22/84 thru 9/24/84 9/25/84 9/26/84 9/27/84 9/28/84 Complete record for each day while drilling or workover in progress 13-3/8" @ 2539' 8960', (2374'), POH f/bit RIH w/globe bskt & JB, POH, retrv bit cone. Drl & surv 12!g" hole to 8450', gas cut mud, inc'd mud wt to 10.4 ppg. Drl to 8960 6735 , 31.8°, N36E, 6668 TVD, 348 VS, 294N, 191E 7170 , 43.8°, N37E, 7011TVD, 614 VS, 508N, 351E 7510 , 53.5°, N39E, 7234 TVD, 870 VS, 712N, 507E 7916 , 57.7°, N39E, 7463 TVD, 1204 VS, 972N, 718E 8848 , 52.8°, N41E, 7993 TVD, 1971VS, 1560N, 1210E 13-3/8" @ 2539' 9375', (415'), Cond f/9-5/8" Drl & surv 12¼" hole to 9375', cond hole. 9129', 55.8°, N40E, 8157 TVD, 2199 VS, 1733N, 1359E 9286', 58.6°, N39E, 8242 TVD, 2331VS, 1835N, 1442E 9-5/8" @ 9397' 9423', (48'), Prep to cml 9-5/8" Cond hole f/csg. Drl 12¼" hole f/9375'-9423', POH. RU & rn 172 jts, 9-5/8" L-80 & 49 jts, S00-95 w/FS @ 9397', FC @ 9313' 9-5/8" @ 9397' 9444', (21'), Drlg Wt. 10.4, PV 11, YP 19, PH 10.5, WL 8.5, Sol 11 Cmt 9-5/8" w/500 sx C1 "G" w~l% CFR-2 & .15% HR-7. Displ w/rig pmp, bump plug. CIP @ 0900 hrs, 9/26/84. Chg rams & tst to 3000 psi. TIH w/8½" BHA, wsh f/9254'-9302', DO cml & FC to 9329', tst csg to 3000 psi; OK. DO cmt, FS + 20' new hole. Conduct leak-off tst to 12.3 ppg EMW. Chg well over to BridgeSal. 9-5/8" @ 9397' 10,053', (609'), Drlg Wt. 10.4, PV 10, YP 19, PH 9.0, WL 9.0, Sol 14.5 Drl & surv 8½" hole to 10,053'. 9684', 65.9°, N34E, 8427.12 TVD, 2682.31VS, 2118.01N, 1652.03E 9872', 70.3°, N30E, 8497.38 TVD, 2854.47 VS, 2265.85N, 1744.37E 9966', 73°, N27E, 8526.98 TVD, 2941.58 VS, 2344.25N, 1786.95E The above is correct Signature For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B JOate JTitle 10/15/84 Drilling Superintendent iYr D JNumbe~ 8ll dsily well hislo~y Io~ms Conseculively as lhey are prepared lo~ emch well. Pagf no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used dur ng drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number a;I drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report officiaJ or representat ve test on "Final" form_ 1) Submit "lnlerim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Date and depth as of 8:00 a.m. County or Parish Alaska North Slope Borough Lease or Unit Prudhoe Bay Unit ADL #28306 Complete record for each day while drilling or workover in progress 9/29/84 thru 10/1/84 10/02/84 10/03/84 10/04/84 10/05/84 Stale Alaska Well no. 15-8 9-5/8" @ 939'7' 11,345', (1392'), TOH to 9-5/8" FS Wt. 10.7, PV 12, YP 25, PH 8.5, WL 9.2, Sol 16.5 Drl & surv 8½" hole to 11,345', circ, short trip to 9-5/8" ¥S. 10,062', 75.8°, N27E, 8552.79 TVD, 3031.24 VS, 2426.64N, 1828.92E 10,459', 77.3°, N24E, 8642.97 TVD, 3404.38 VS, 2774.93N, 1997.19E 10,896', 76.4°, N21E, 8744.95 TVD, 3808.81VS, 3165.28N, 2164.36E 11,178', 80.2°, N23E, 8802.88 TVD, 4068.70 VS, 3422.39N, 2264.71E 9-5/8" @ 9397' 11,345', (0'), TIH w/Schl DAE logging assy Wt. 10.8, PV 12, YP 25, PH 8.5, WL 8.8, Sol 17 TIH, circ visc mud sweep, spot 200 bbl BridgeSal pill in open hole, TOH f/logs. RU Schl, TIH w/DLL/LDT/CNL/GR. 9-5/8" @ 9397' 11,345', (0'), LD DAE logging BHA Wt. 10.8, PV 13, YP 28, PH 8.0, WL 8.4, Sol 2 TIH w/DAE logging assy to 10,460', pmp dn locomotive & latch elec conn in connecting stinger, POOH w/locomotive. TOH into 9-5/8" csg, rehead WL, TIH, PU locomtove & pmp dn DP. Latch locomotive & pmp logging tls to 10,750', tls would not pmp out past 10,750'. Att to log, WL conn shorted. POOH w/logging BHA. Prep to rn GR during cond'g rn. 9-5/8" @ 9397' 11,345', (0'), Spot hi vis pill Wt. 10.6, PV 13, YP 24, PH 8, WL 8.8· Sol 3 Fin LD logging assy. RIH w/GR, log 10,786'-11,148' for 3rd DAE logging rn. .. · cond hole. -~' · 9-5/8" @ 9397' 11,345', (0'), POOH Wt. 10.8+, PV 13, YP 31, PH 8, WL 8.8, Sol 3 POH. RU Schl DAE logging tls, RIH, C&C @ 10,465'. Pmp dn WL locomotive, pmp DIL/LDT/CNL/GR out & dn to 11,200', log 10,465'-11,200' and 11,200'-10,925'; tl stuck. Pull, overline parted, POH w/WL. POH w/DP, logging tls stuck @ 10,925', wrk pipe, POH slowly. The above is correct Signature For form preparation and distribution see Procedures Manual Section 10. Drilling, Pages 86 and 87 IOate AR3B-459-2-B Number all daily well history forms consecutively as they are prepared for each well. IPa~e no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially_ Attach description of all cores. Work performed by Producing Section will be reported on "lnferim" sheels until final completion. Report official or representative test o. "Final" form. 1) Submit "Interim" sheets when filled out but not less irequenlly than every 30 days. or (2) on Wedeesday of the week in which oil string is set. Submit weekly for workovers and following setting ot oil string until completion. District Field Date and depth as of 8:00 a.m. Alaska county or Parish North Slope Borough Prudhoe Bay Unit tease or U,t ADL #28306 Complete record for each day while drilling or workover in progress 10/06/84 thru 10/08/84 10/09/84 10/10/84 10/11/84 10/12/84 IState Alaska Well no. 15-8 7" @ 10,898' 10,680' PBTD, 11,345' TD, RIH w/cmt retnr Wt. 10.5, PV 15, YP 13, PH 12, WL 14, Sol 4.5 LD DAE logging tls, RD Schl. RIH w/8½" BHA, rn'g GR, POH f/7" lnr. RU & rn 40 jts + mkr jt & pmp, 7", 29#, L-80 BTC csg w/7" stage colr @ 10,882', LC @ 10,893', FS @ 10,898'. Cml w/500 sx C1 "G". CIP @ 1645 hrs, 10/6/84. Displ using rig pmps, bump plug. Chg rams f/7"-?' & 5"-3½", tst BOPE. RIH w/8½" bit/9-5/8" csg scrprs, wsh & rm f/8609'-9068', CBU, POH. RIH, wsh & rm thru lnr lap, DO cmt inside lnr f/9068'-9092', drl to 10,680', DO cml. Tst 9-5/8" x 7" @ 10,592', leaked, CBU, POH. CR & RIH. 7" @ 10,898' 10,680' PBTD, 11,345' TD, RIH Wt. 10.4+, PV 6, YP 0, PH 12.5, WL 25, Sol 3 Fin RIH w/CR & set @ 9040'. Sting in, est IR @ 3.5 BPM/3300 psi, sqz 200 sx C1 "G" w/l% CFR-2 & .15% HR-7. CIP @ 1445 hrs, 10/8/84. WOC, RIH, lk'g f/cmt top. 7" @ 10,898' 10,680' PBTD, 11,345' TD, Drlg hard cmt Wt. 10.5+, PV 11, YP 13, PH 12, WL 14, Sol 5 Wsh in hole, drl firm cml & CR f/9028'-9068', CBU, POH. Tst lnr lap @ 2000 psi. RIH, wsh & rm thru TOL, push jnk to btm, drl hard cmt 10,680'-10,840' 7" @ 10,898' 10,680' PBTD, 11,345' TD, Prep to rn CH DAE log Wt. 10.5+, PV 9, YP 6, PH 12.5, WL 14, Sol 5 Drl cmt f/10,840'-10,886', tst 7" lnr across stage colr ports to 2000 psi; OK. DO to 10,920', LC @ 10,893'. PU to 11,163', CBU, spot cln BridgeSal pill in open hole, TOH. RU Schl, rn CET/CNL/GR; unable to get past 9880', log out of hole. RU to rn ~Schl cased hole DAE logs. -7" @ 10,898' 10,208, (0'), Rig repair Wt. 10.5+, PV 7, YP 1, PH 12.5, WL 10 TIH w/log'g assy, circ hole, pmp dn locomotive. Pmp logs out of protective slv, log CET/CNL/CBL/GR f/10,898'-9068', POOH & LD logs. MU 9-5/8" S~g,ature ~ ~~ For form preparation and distribution~ see Procedures Manual Section 10, - Drilling, Pages 86 and 87 AR3B-459-2-B IOate ]Title 10/15/84 Drilling Superintendent Number all daily well hislory forms conse~lve]y ] ]Pa~e no. as lhey are p~epared for each well. I: ARCO Oil and Gas Company Daily Well History--Interim Instruct ons Th s form is used during drilling or workover operat ons If testing, cot ng, or perforating show formation name in describing work performed. Number a drill stem tests sequent a y Attach descript on o a cores Work performed by Producing Section will be reported on "Interim" sheets until final comoletion. Raped official or representative test on "Final" form. 1) Submit "Interim" sheets when f ed out but not ess frequently than every 30 days, or (2) on ¢/ednesday of the week in which oil string is set. Submit weekly for workovers and following setling of oil string until completion. District ICounty or Parish IState Alaska I North Slope Borough I Alaska Field Lease or Unit Well no. !nit ADL #28306 15-8 Prudhoe Bay Date and deptl~ as of 8:OO a.m. 10/13/84 thru 10/15/84 10/16/84 10/17/84 10/18/84 10/19/84 Complete record for each day while drilling or workover in progress 7" @ 10,898' 11,345' TD, TIH w/JB & scrprs to FS Wt. 10.6, PV 10, YP 16, PH 11.5, WL 16 Fin rig repair. TIH w/bit & 7" csg scrprs, stuc @ 10,898', pull free, POOH. TIH w/6" tapered mill, wsh & rm 10,873'-10,979', TOH. TIH w/bit & JB, wsh 9040'-9115', att to PU jnk on top of 7" lnr, TIH to 10,872', wsh & rm to 10,896', CBU, TOH. TIH w/bit & slick BHA, wsh & rm f/10,866'-11,160'. Spot 200 bbls BridgeSal in open hole. TIH w/globe bskt & 2 JB. 7" @ 10,898' 11,070' (-120'), LD 5" slotted lnr/wshpipe assy Wt. 10.6+, PV 10, YP 15, PH 11.5, WL 14.7 Fin TIH to 10,896', wrk pipe to 10,850', CBU, TOH & LD JB & globe bskts. RU & rn 5" slotted lnr, lnr stopped @ 11,070', pmp pill, POOH f/CO trip. 7" @ 10,898' 11,190', PU 5" Lnr Assy Wt. 10.6+, PV 12, YP 17, PH 11.5, WL 13.7 LD 5" lnr. TIH w/6" bit to 10,896', wsh & rm to 11,190', TOH to 7" shoe, circ hi-vis sweep & wrk pipe, TOH. PU 6" magnet/JB, TIH, TIH to 7" shoe, CBU, pmp pill, TOH. MU 5" lnr. 5" @ 11,169' 11,345' TD, POH f/DST tls Wt. 10.7, PV 12, YP 20, PH 11.5, WL 11 RIH w/5", 18#, S-95 slotted lnr w/Wolverine pkr, set pkr w/top @ 10,878', FS @ 11,169', slotted lnr 11,166'-10,882', POH f/DST tls. 5" @ 11,169' Flowing Well Wt. 10.6, PV 12, YP 19, PH 11.5, WL 11.2 Chg rams & tst. MU tst tools & head. RIH w/DST tools. RU Howco, tst manif, tst surf Ins, choke manif to 5000 w/Nitrogen. Set pkr & tst bkside. Displ 90 bbl crude & Nitrogen dwn DP. Bleed off to 1000 psi. SI well. Flow well. The above is correct Signature For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B IDate ITitle t0/23/84 Drilling Superintendent as they are prepared for each well. ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Reporl" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned. or Sold. "Final Report" should be submitted also when. operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used Ior reporting the entire operation if space is available. I Acco~nting cost center code District County or Parish Slate Alaska North Slope Borough Alaska Fieid I Lease or Unit I Well no. Prudhoe Bay Unit I ADL ~28306 I 15-8 Auth. or W.O. no. ~Title AFE 303992 I Drill, Complete & Perforate Parker #176 Operator IA.R.Co. W.I. ARCO Alaska, Inc. JDate 56.24% Spudded or W.O. begun Spudded [ 9/16/84 Date and depth Complete record for each day reported as of 8:00 a.m. 10/20/84 thru 10/21/84 API 50-029-21180 I otal number of wells (active or inactive) on this Dst center prior to plugging and bandonment of this well I our J Prior status if a W.O. I 0545 Hrs. 5" @ 11,169' 10.6 NaC1 in ann - diesel/crude in tbg Flow well. Stabilize rate @ 2000 BOPD. SI DST f/PBU. Rev cir¢ DST fluid out of DP, ck f/flow, POH, LD DP. Fin LD DP, chg rams & tst. Rn 219 jts, 4½", 126# BTC tbg w/Bal-O-Nipple @ 2174.31', PBR/Pkr @ 8994.46', tbg tail @ 9126.98' MU hgr & ind. Tst seals to 5000 psi. ND BOPE, NU & tst tree to 5000 psi. RU S/L unit, pull dummy SSSV, displ tbg w/140 bbls crude & 30 bbls diesel. RIH w/std'g vlv, set pkr, hold press f/tbg tst. POH w/std'g vlv. PU SSSV, RIH & set. RR @ 1800 hrs, 10/21/84. Old TO INew TO PB Depth I 11,345' (9/29/84) 10,680' Released rig ~ Date Kind of rig 1800 Hrs. ] 10/21/84 Rotary Classifications (oil, gas, etc.) I Type completion (single, dual. etc.) 0il I Single Producing method Official reservoir name(s) Flowing Sadlerochit Potential test data Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and d~tribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C 10/23/84 Dr it'~irrg ~S~erint endent Number all daily well histo~ forms consecutively I Page no. as lhey are prepared for each we ' ] 6 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 21, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK '99501 SUBJECT: DS 15-8 Dear Mr. Chatterton. Enclosed is a copy of the DS 15-8 Well History to include with the Well Completion Report, dated 02/13/85. ~f you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU4/L170 Enclosure xc' DS 15-8 Well File RECEIVED FEB 2 1 Alaska 0it & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Ink Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: February 18, 1985 Reference: ARCO CH Final zzg-16 Injection Profile Survey 1-12-85 Run 1 5" GO ~13-21 Injection Profile Survey 1-14-85 Run 1 5" GO /15-7 Gamma Ray Log j15'8 Gamma Ray Log ~-15-9 Gamma Ray Log ~/~15-16 Collar Log 15-20 Gamma Ray Log >~14-29 Spinner j14-30 Spinner 1-27-85 Run 1 5" Camco 1-28-85 Run 1 5" Camco 2-4-85 Run 1 5" Camco 1-10-85 Run 1 5" GO 1-25-85 Run 2 5" Camco 2-2-85 Run 1 5" Camco 1-30-85 Run 2 5" Camco ign and return the attached copy as receipt of data, Received by Pam Lambert ATO 1429C Trans #~)~ Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, Inc.~'''-''-''~ Post Office b~.. ,~0360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 13, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- DS 15-8 Dear Mr. Chatterton' Enclosed are the Well Completion Report and gyroscopic survey for the subject well. I have not received a copy of the Well History. When I do, I will forward a copy to you. If you have any questions, please call me at 263-4944. Si ncerely, Gruber Associate Engineer JG/tw GRU4/L149 Enclosures RECEIVED ~lasl~ Off & .Gas Cons. Cornmissior~ Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~-~? STATE OF ALASKA ALASKA~_ "AND GAS CONSERVATION C~' AISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL E~x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] , 2. Name of Operator "7. Permit Number ARCO Alaska, Inc. 84-155 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21180 4. Location of well at surface 9. Unit or Lease Name 1645' FNL, 1378' FWL, Se¢.22, T11N, R14E, UM Prudhoe Bay Unit At Top Producing Interval ! L©C,~\.TiC)~!S i i 0. Well Number 355' FSL, 2489' FEL, Sec.15, T11N, R14E, UM ! ¥?,l~i;~P 1 15-8 i °u'"~1 ~..lj~8~FSL, /'~2~ FEL, Sec.15, TllN, R14E, UM Prudhoe Bay Field 5. Elevation in fee~*l~d~cate KB, DF, etc. I 6. Cease Designation and Serial No. Prudhoe Bay 0i 1 Pool 71' RKB ADL 28306 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. [ 15. Water Depth, if offshore 116. No. of Completions 09/16/84 10/01/84 10/21/84J N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost ll,345'MD~/~'TVD l1190'MD, 8810'TVD YES [] NO [] 2174 feet MD[ 1900' (Approx) 22. Type Electric~o~r~t~er Logs Run D IL/LDT/CNL/GR, CET/CNL/GR, CET/CNL/CBL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD , CASING SlZEI WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# U-40 Surf 90' 30" 370 sx PF II 13-3/8" 72.0# L-80 Surf 2539' 17-!/2" 1938 sx PF "E" + 400 sx PF "C" 9-5/8" 47.0# L-80 Surf 9397'- 12-1/4" 500 sx Class "G" + 300 x PF "C" 7" 29.0# L-80 9068' 10898' 8-1/2" 325 sx Class "G" + 200 x Class "G" 5" slotted lnr 18.(.# S-95 10878' 11169' 8-1/2" Not cmtd; pkr set (~ 10, 78' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5" slotted 1 i net. f/11,1 69' - 10,882' 4-1/2" 9127' 8994' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) 'AMOUNT & KIND OF MATERIAL USED N/A 27. PRODUCTION TEST Date First Production I MethOd of Operation (Flowing, gas lift, etc.) 1 2/11/84J F1 owl ng Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 01/03/85 9.1 TESTPERIOD I~ 659.4 612.7 ' 0 66°I 929 scf/STB ~low Tubing Casing Pressure CALCULATED ~! OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 330 N/A 24-HOUR RATE 1739 1616 0 29.0 28. CORE DATA · Briefdescripti~n~f~i~h~~~gy~p~r~sity~fractures~apparentdipsandpresence~f~i~~gas~rwa~er.submitc~rechips.Nolle 41aska Oil ., 'orm 10-407 JMM/WC34 Submit in duplicate v. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sadlerochit GOC Base Sadl erochit GEOLOGIC MARKERS MEAS. DEPTH 9424' not availabl 11,!70' TRUE VERT. DEPTH 8313' 8807' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. NONE 31. LIST OF ATTACHMENTS Gyroscopic Survey (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Associate Engineer INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is.completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of-the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none''. A flCRichfieidCompany Daily Well History-Initial Report Prepare and submit the "Initial Report" on the flr~ Wednesday after a well is spudded or workover operations are started. Dally worl( pdor to spudding should be summ~/=~__-~: ~ form giving inclusive dates only. District : Alaska County or Parish North Slope Borough Field Lea~ or Unit Prudhoe Bay Unit ADL #28306 Au~. or W.O. no. Title AFE 303992 Drill, Complete & Perforate IState Alaska Well no. 15-8 Parker #176 API 50-029-21180 Operator ARCO Alaska, Inc. Spudded or W.O. begun [Date IHour Spudded 9/16/84 0545 Hrs. A.R.Co's W.I. 21.66% Pr or status if a W.O. Date and depth as of 8:06 a.m. 9/17/84 9/18/84 9/19/84 9/20/84 9/21/84 Complete record for each day reported 20" @ 90' 2560', (2480'), Rn'g 13-3/8" csg Wt. 9.6, Vis 140, PV 10, YP 50, PH 9, WL NC, Sol 9 Accept rig @ 0230 hrs, 9/16/84. NU 20" diverter sys. Spud well @ 0545 hrs, 9/16/84. Drl 17½" hole to 2560', CBU, 6 std short trip, POH. RU to rn 13-3/8" csg. 2500', 1/2°, S89-1/2E 13-3/8" @ 2539' 2559' (corrected), DO FC Rn 65 jts, 13-3/8", 72#, L-80 BTC csg & lnd w/FS @ 2539', FC @ 2457'. Cmt w/1938 sx PF "E" w/.12% HR-15, followed w/400 sx PF "C". Displ using rig pmp. CIP @ 1401 hrs, 7/17/84. ND diverter, NU & tst BOPE to 5000 psi. RIH w/12¼" BHA, tag FC @ 2459', tst csg to 1500 psi. DO FC. 13-3/8" @ 2539' 5560', (3001'), POH DO cmt, FC, FS + 10' new formation. Conduct formation tst to 11.2 ppg EMW. Drl & surv 12¼" hole tO---5~0', CBU, POH f/KO BHA. 5488', .4°, S80W, 5487 TVD, -1.4 VS, 9N, 13W 13-3/8" @ 2539' 6102', (542'), POH RIH, Navi-Drl & surv 12¼" hole to 6102', POH f/BHA. __ '4 5642', 3.3°, N48E, 5642 TVD, 13.94N, 15.25W 6008', 16 2°, N39E 6002 TVD, 64. VS, 61.57N, 27.25E , 13-3/8" @ 2539' 6586', (484'), POH PU BHA, RIH, drl & surv 12¼" hole to 6586'. 6276', 20.2°, N33E, 6256 TVD, 148 VS, 129N, 76E 6491', 25.7°, N35E, 6454 TVD, 231VS, 199N, 123E RECEIVED FEB 2 1 1985 Alaska 0il & Gas Cons. Commiss~ Anchorage The above is correct Signature ri~ For form preparation and diet see Proceduree Manual, Section 10, Drilling, Pages 88 and 87, IDate 10/15/84 Title Drilling Superintendent ARCO Oil and Gas Company 4~, Daily Well History--Interim Inetructinns: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all dri;I stem tests sequentially. Attach description of all cores. Work peri=ormed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field I County or Parish Alaska North Slope Borough I Lease or unit Prudhoe Bay Unit ADL #28306 Complete record for each day while drilling or workover in progress Date and depth as of 8:00 a.m. The above is correct 9/22/84 thru 9/24/84 9/25/84 9/26/84 9/27/84 9/28/84 IState 13-3/8" @ 2539' 8960', (2374'), POH f/bit RIH w/globe bskt & JB, POH, retrv bit cone. Drl & surv 12¼" hole to 8450', gas cut mud, inc'd mud wt to 10.4 ppg. Drl to 8960'. 6735', 31.8°, N36E, 6668 TVD, 348 VS, 294N, 191E 7170', 43.8°, N37E, 7011TVD, 614 VS, 508N, 351E 7510', 53.5°, N39E, 7234 TVD, 870 VS, 712N, 507E 7916', 57.7°, N39E, 7463 TVD, 1204 VS, 972N, 718E 8848', 52.8°, N41E, 7993 TVD, 1971VS, 1560N, 1210E 13-3/8" @ 2539' 9375', (415'), Cond f/9-5/8" Drl & surv 12¼" hole to 9375', cond hole. 9129', 55.8°, N40E, 8157 TVD, 2199 VS, 1733N, 1359E 9286', 58.6°, N39E, 8242 TVD, 2331VS, 1835N, 1442E Alaska Well no. 15-8 9-5/8" @ 9397' 9423', (48'), Prep to cmt 9-5/8" Cond hole f/csg. Drl 12¼" hole f/9375'-9423', POH. RU & rn 172 jts, 9-5/8" L-80 & 49 jts, S00-95 w/FS @ 9397', FC @ 9313'. 9-5/8" @ 9397' 9444', (21'), Drlg Wt. 10.4, PV 11, YP 19, PH 10.5, WL 8.5, Sol 11 Cmt 9-5/8" w/500 sx Cl "G" w/l% CFR-2 & .15% HR-7. Displ w/rig pmp, bump plug. CIP @ 0900 hrs, 9/26/84. Chg rams & tst to 3000 psi. TIH w/8½" BHA, wsh f/9254'-9302', DO cmt & FC to 9329', tst csg to 3000 psi; OK. DO cmt, FS + 20' new hole. Conduct leak-off tst to 12.3 ppg EMW. Chg well over to BridgeSal. 9-5/8" @ 9397' 10,053', (609'), Drlg Wt. 10.4, PV 10, YP 19, PH 9.0, WL 9.0, Sol 14.5 Drl & surv 8½" hole to 10,053'. 9684', 65.9°, N34E, 8427.12 TVD, 2682.31VS, 2118.01N, 1652.03E 9872', 70.3°, N30E, 8497.38 TVD, 2854.47 VS, 2265.85N, 1744.37E 9966', 73°, N27E, 8526.98 TVD, 2941.58 VS, 2344.25N, 1786.95E 10/15/84 ~it,e Signature /~'~'~f ~.-y'2~~ I Date For form preparation and distribution I~ see Procedures Manual Section 10, Drilling, Pages 86 and 87 RECEIVED FEB 2 ! Y3B5 Alaska Oil & Gas Cons. commission Drilling Superintendent ARCO Oil and Gas Company Daily Well History--Interim Inslrucfions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District I County or Parish Field ILease or Unit Prudhoe Bay Unit I ADL #28306 Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. A1 aska North Slope Borough IState Alaska Well no. 15-8 9/29/84 thru 10/1/84 10/02/84 10/03/84 10/04/84- 10/05/84 9-5/8" @ 9397' 11,345', (1392'), TOH to 9-5/8" FS Wt. 10.7, PV 12, YP 25, PH 8.5, WL 9.2, Sol 16.5 Drl & surv 8½" hole to 11,345', circ, short trip to 9-5/8" FS. 10,062', 75.8°, N27E, 8552.79 TVD, 3031.24 VS, 2426.64N, 1828.92E 10,459', 77.3°, N24E, 8642.97 TVD, 3404.38 VS, 2774.93N, 1997.19E 10,896', 76.4°, N21E, 8744.95 TVD, 3808.81VS, 3165.28N, 2164.36E 11,178', 80.2°, N23E, 8802.88 TVD, 4068.70 V$, 3422.39N, 2264.71E 9-5/8" @ 9397' 11,345', (0'), TIH w/Schl DAE logging assy Wt. 10.8, PV 12, YP 25, PH 8.5, WL 8.8, Sol 17 TIH, circ visc mud sweep, spot 200 bbl BridgeSal pill in open hole, TOH f/logs. RU Schl, TIH w/DLL/LDT/CNL/GR. 9-5/8" @ 9397' 11,345', (0'), LD DAE logging BHA Wt. 10.8, PV 13, YP 28, PH 8.0, WL 8.4, Sol 2 TIH w/DAE logging assy to 10,460', pmp dn locomotive & latch elec conn in connecting stinger, POOH w/locomotive. TOH into 9-5/8" csg, rehead WL, TIH, PU locomtove & pmp dn DP. Latch locomotive & pmp logging tls to 10,750', tls would not pmp out past 10,750'. Att to log, WL conn shorted. POOH w/logging BHA. Prep to rn GR during cond'g rn. 9-5/8" @ 9397' 11,345', (0'), Spot hi vis pill Wt. 10.6, PV 13, YP 24, PH 8, WL 8.8, Sol 3 Fin LD logging assy. RIH w/GR, log 10,786'-11,148' for 3rd DAE logging rno , cond hole 9-5/8" @ 9397' 11,345', (0'), POOH Wt. 10.8+, PV 13, YP 31, PH 8, WL 8.8, Sol 3 POH. RU Schl DAE logging tls, RIH, C&C @ 10,465' Pmp dn WL locomotive, pmp DIL/LDT/CNL/GR out & dn to 11,200', log 10,465'-11,200' and 11,200'-10,925'; ti stuck. Pull, overline parted, POH w/WL. POH w/DP, logging tls stuck @ 10,925', wrk pipe, POH slowly. RECEIVED The above is correct Signature er ~r~;omc ePdruerPeasr a 'Mia°nnu aa ~ ds ed~ 'or 'nb I~ t~.On ~ Drilling, Pages 86 and 87 IDate 10/15/841TM Drilling suPerint~g~ng 1 I~B~ AlasKa 0ii & Gas Cons. Commission Anchorage A~CO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Date and deptll as of 8:00 a.m. I County or Parish Alaska North Slope Borough I Lease or Unit Prudhoe Bay Unit ADL #28306 Complete record for each day while drilling or workover in progress 10/06/84 thru 10/08/84 10/09/84 10/10/84 10/11/84 10/12/84 State Alaska Well no. 15-8 7" @ 10,898' 10,680' PBTD, 11,345' TD, RIH w/cmt retnr Wt. 10.5, PV 15, YP 13, PH 12, WL 14, Sol 4.5 LD DAE logging tls, RD Schl. RIH w/8½" BHA, rn'g GR, POH f/7" lnr. RU & rn 40 its + mkr jt & pmp, 7", 29#, L-80 BTC csg w/7" stage colr @ 10,882', LC @ 10,893', FS @ 10,898'. Cmt w/500 sx C1 "G". CIP @ 1645 hrs, 10/6/84. Displ using rig pmps, bump plug. Chg rams f/7"-5" & 5"-3½", tst BOPE. RIH w/8½" bit/9-5/8" csg scrprs, wsh & rm f/8609'-9068', CBU, POH. RIH, wsh & rm thru lnr lap, DO cmt inside lnr f/9068'-9092', drl to 10,680', DO cmt. Tst 9-5/8" x 7" @ 10,592', leaked, CBU, POH. CR & RIH. 7" @ 10,898' 10,680' PBTD, 11,345' TD, RIH Wt. 10.4+, PV 6, YP 0, PH 12.5, WL 25, Sol 3 Fin RIH w/CR & set @ 9040' Sting in, est IR @ 3.5 BPM/3300 psi, sqz 200 sx C1 "G" w/l~ CFR-2 & .15% HR-7. CIP @ 1445 hrs, 10/8/84. WOC, RIH, lk'g f/cmt top. 7" @ 10,898' 10,680' PBTD, 11,345' TD, Drlg hard cmt Wt. 10.5+, PV 11, YP 13, PH 12, WL 14, Sol 5 Wsh in hole, drl firm cmt & CR f/9028'-9068', CBU, POH. Tst lnr lap @ 2000 psi. RIH, wsh & rm thru TOL, push jnk to btm, drl hard cmt 10,680'-10,840'. 7" @ 10,898' 10,680' PBTD, 11,345' TD, Prep to rn CH DAE log Wt. 10.5+, PV 9, YP 6, PH 12.5, WL 14, Sol 5 Drl cmt f/10,840'-10,886', tst 7" lnr across stage colr ports to 2000 psi; OK. DO to 10,920', LC @ 10,893'. PU to 11,163', CBU, spot cln BridgeSal pill in open hole, TOH. RU Schl, rn CET/CNL/GR; unable to get past 9880', log out of hole. RU to rn Schl cased hole DAE logs. 7" @ 10,898' 10,208, (0'), Rig repair Wt. 10.5+, PV 7, YP 1, PH 12.5, WL I0 TIH w/log'g assy, circ hole, pmp dn locomotive. Pmp logs out of protective slv, log CET/CNL/CBL/GR f/10,898'-9068', POOH & LD logs. MU 9-5/8" The above is correct For form preparation and distributio ~r see Procedures Manual Section 10, Drilling, Pages 86 and 87 IDate ]Title 10/15/84 Drilling superiR _ _nE !V E D FEB 2 1 1985 Alaska Oil & Gas Cons. Cornmi~smn Anchorage ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday ut the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Date and depth as of 8:00 a.m. I County or Parish Alaska North Slope Borough I Lease or Unit Prudhoe Bay Unit ADL //28306 Complete record for each day while drilling or workover in progress 10/13/84 thru 10/15/84 10/16/84 10/17/84 10/18/84 The above is correct 10/19/84 IState Alaska 7" @ 10,898' 11,345' TD, TIH w/JB & scrprs to FS Wt. 10.6, PV 10, YP 16, PH 11.5, WL 16 Fin rig repair. TIH w/bit & 7" csg scrprs, stuc @ 10,898', pull free, POOH. TIH w/6" tapered mill, wsh & rm 10,873'-10,979', TOH. TIH w/bit & JB, wsh 9040'-9115', att to PU jnk on top of 7" lnr, TIH to 10,872', wsh & rm to 10,896', CBU, TOH. TIH w/bit & slick BHA, wsh & rm f/10,866'-11,160'. Spot 200 bbls BridgeSal in open hole. TIH w/globe bskt & 2 JB. , pmp 7" @ 10,898t 11,070' (-120'), LD 5" slotted lnr/wshpipe assy Wt. 10.6+, PV 10, YP 15, PH 11.5, WL 14.7 Fin TIH to 10,896', wrk pipe to 10,850', CBU, TOH & LD JB & globe bskts. RU & rn 5" slotted lnr, lnr stopped @ 11,070' pill, POOH f/CO trip. 7" @ 10,898' 11,190', PU 5" Lnr Assy Wt. 10.6+, PV 12, YP 17, PH 11.5, WL 13.7 LD 5" lnr. TIH w/6" bit to 10,896', wsh & rm to 11,190', TOH to 7" shoe, circ hi-vis sweep & wrk pipe, TOH. PU 6" magnet/JB, TIH, TIH to 7" shoe, CBU, pmp pill, TOH. MU 5" lnr. 5" @ 11,169' 11,345' TD, POH f/DST tls Wt. 10.7, PV 12, YP 20, PH 11.5, WL 11 RIH w/5", 18#, S-95 slotted lnr w/Wolverine pkr, set pkr w/top @ 10,878', FS @ 11,169', slotted lnr 11,166'-10,882', POH f/DST tls. Well no. 15-8 5" @ 11,169' Flowing Well Wt. 10.6, PV 12, YP 19, PH 11.5, WL 11.2 Chg rams & tst. MU tst tools & head. RIH w/DST tools. RU Howco, tst manif, tst surf Ins, choke manif to 5000 w/Nitrogen. Set pkr & tst bkside. Displ 90 bbl crude & Nitrogen dwn DP. Bleed off to 1000 psi. SI well. Flow well. . K_tLr vrD Signature For form ~reparation and distribution see Procedures Manual Section 10. Drilling, Pages 86 and 87 rDate I Title 10/23/84 Drilling Superintend,,gr~ r~ Alaska 0il & Gas Cons. Commission Anchorage ARco Oil and Gas Company Daily Well History-Final Report Inslructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative lest data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District I County or Parish I State Alaska I North Slope Borough I Alaska Field Itease or Unit IWell no. Prudhoe Bay Unit I ADL t/28306 I 15-8 Auth. or W.O. no. I Title AFE 303992 I Drill, Complete & Perforate API 50-029-21180 Operator Parker # 176 A.R.Co. W.I_ ARCO Alaska, Inc. 56.24% Spudded or W.O. begun Date Spudded 9 / 16 / 84 Date and depth Complete record for each day reported as of 8:00 a.m. 10/20/84 thru 10/21/84 I otal number of wells (active or inactive) on this Dst center prior to plugging and I bandonment of this well I our 0545 Hrs. Prior status if a W.O. 5" @ 11,169' 10.6 NaC1 in ann - diesel/crude in tbg Flow well. Stabilize rate @ 2000 BOPD. SI DST f/PBU. Rev circ DST fluid out of DP, ck f/flow, POH, LD DP. Fin LD DP, chg rams & tst. Rn 219 jts, 4½", 126# BTC tbg w/Bal-O-Nipple @ 2174.31', PBR/Pkr @ 8994.46', tbg tail @ 9126.98'. MU hgr & ind. Tst seals to 5000 psi. ND BOPE, NU & tst tree to 5000 psi. RU S/L unit, pull dummy SSSV, displ tbg w/140 bbls crude & 30 bbls diesel. RIH w/std'g vlv, set pkr, hold press f/tbg tst. POH w/std'g vlv. PU SSSV, RIH & set. RR @ 1800 hrs, 10/21/84. Old TO -Released rig 1800 Hrs. Classifications (oil, gas, etc.) 0il Producing method Flowing Potential test data New TD Date PB Depth 11,345' (9/29/84) Kind of rig 10,680' 10/21/84 Type completion (single, dual, etc.) Single Official reservoir name(s) Sadlerochit alaslm Oil & Gas Cons, c0mmisslor~ i V E D Well no. Date R ..... ir Producing Interval Oil or gas Test time Production^,ch0raae Oil on test Gas~er day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature For form preparation a~3d cl~stribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. IOate 10/23/84 ITM Drilling Superintendent T~L~EO TELECO OILFIELD SERVICES INC. 6116 NIELSON WAY, ANCHORAGE, ALASKA 99502 TEL. (907) 562-2646 October 15, 1984 ARCO Prudhoe Bay DS-15 Well No. 8 DRILLiiV$ ~'J' tr'J,~AGE FILE COPy tRC..O ALASKA, IN['. Please find attached a copy of the computer calculated MWD directional survey for the above mentioned well. On behalf of TELECO, I would like to thank you for the opportunity to serve ARCO. We are always striving to supply only the highest quality of service for our customers. Please feel free to contact me if you have any questions. Sincerely yours, Leif Syversen Marketing Representative LS/ck Enclosure ECEIVED JUL l ~ igS5 '~--~,~a Oil & Gas Cons, Commission /~nchorage D I RECT IDN~L CUSTOMER : ARCO [:0CAI"II]N : PRUDHOE BAY, ALASKA WELL PAD : DS-15 WELL.. NO. : DRILI..ING CO. : PARKER RIG NO. : 176 CLIST[IMER J[IB NO, : IELECO JOB NO. : 385-AK SLJ R k/F_- Y' RF--' PO R ., TELECO OILFIELD SERVICES OF ALASKA, INC. 6116 NIELSON WY., ANCHORAGE, ALASKA, 99502 TEL : (907) 562-2646 DATA REDUCED BY RADIUS OF CURVATURE METHOD TYPE OF SURVEY : MAGNETIC PAGE MAGNETIC DECLINATION : 30.30 E STAR1 DATE : 09/18/84 FINISH DATE : 10/01/84 PLANE OF PROPOSED DIRECTION IS : N 41 E REPORT PREPARED BY : DAVE REIMER MEASURED DRIFT TRUE VERTICAL DRIFT DEPTH ANGL. E VERTICAL SECTION DIRECTION DEG MIN DEPTH PEG MIN TOTAL COORDINATES CLOSURES DISTANCE ANGLE DD MM SS DOG - LEG SEVERITY DEG/100 FT. 2650 0.00 2650.00 0.00 3002 0.06 3002.00 0.24 3463 0.18 3463.00 1.81 3953 0.36 3952.98 4.21 4445 0.24 4444.96 3.67 4938 0.42 4937.94 1.50 5488 0.24 5487.92 1.94 5642 3.18 5641.83 0.03 5733 7.06 5732.46 8.23 5855 11.12 5852.91 27.61 6008 16,12 6001.55 63.85 6276 20.12 6256.15 147.23 6491 25.42 6454.17~ 230.44 6735 31.48 6668.05 347.28 6951 38,06 6845.10 4'/0.64 7170 43.48 7010.50 613.85 7387 50.24 '7158.22 772.49 7510 53.30 7234.03 869.22 7916 57.42 7463.41 1203.96 8384 55.30 7721.03 1594.53 8848 52.48 7992.78 1970.60 9129 ,5,5.48 8156.75 2198.77 9286 58.36 8241.80 2330.68 9684 65.54 8427.12 2681.79 9778 68.00 8463.92 2767.44 S 0,00 E S 4.30 W S 53.00 W N 47.54 W N 35.54 W N 7.30 W S 80.06 W N 48.24 E N 45.18 E N 41.24 E N 39.18 E N 32.36 E N 35.24 E N 35.48 E N 37.12 E N 37.12 N 37.30 N 38.36 N 38.54 N 40.00 N 40.42 E N 39.36 E N 38.54 E N 34.00 E N 31.54 E 0.00 S 0.31 S 1.72 S 1.55 S 1.65 N 6.05 N 9.17 N 13.65 N 19.29 N ,-~3.40 N 61.01N 128.78 N 198.28 N 293.70 N 393.17 N 507.50 N 633.87 N 710.14 N 9'71.40 N 1273.10 N 1559.72 N 1734.14 N 1836.34 N 2119.66 N 2192.24 N 0.00 E 0.01 W 0.79 W 4.63 W 7.50 W 9.25 W 13.50 W 15.66 W 9.65 W 3.67 E 27.13 E 76.28 E 123.15 E 191.47 E 265.08 E 351.86 E 448.29 E 507.99 E 717.68 E 965.93 E 1209.44 E 1356.58 E 1440.08 E 1649.34 E 1696.39 E 0.00 0.31 S 2 15 00 W 1.89 S 24 35 21W 4.88 S 71 31 54 W 7.68 N 77 35 44 W 11.05 N 56 49 24 W 16.32 N 55 48 49 W 20.78 N 48 55 42 W 21.57 N 26 33 57 W 33.60 N 6 16 27 E 66.77 N 23 58 30 E 149.67 N 30 38 19 E 233.41 N 31 50 43 E 350.61 N 33 06 05 E 474.18 N 33 59 16 E 617.54 N 34 44 02 E 776.37 N 35 16 10 E 873.13 N 35 34 40 E 1207.76 N 36 27 26 E 1598.06 N 37 11 19 E 1973.69 N 37 47 26 E 2201.72 N 38 02 06 E 2333.66 N 38 06 14 E 2685.76 N 37 53 13 E 2771.94 N 37 43 59 E 0.028 0.053 0.126 0.046 0.080 0.149 2.368 4.186 3.39'7 3.284 1.682 2.607 2.501 2.940 2.603 3.043 2.617 1.036 0~509 0.595 1.114 1.822 8.133 3.036 JOB NUMBER : 385-AK CUSTOMER : ARCO D I RECT I ONAI .... DR ILL ING PAD : DS-15 WELL_ NO. : 8 SURVEY PAGE MEASt;RED DRIFT DEPTH ANGLE DEG MIN TRUE VERTICAL DRIFT TOTAL VERTICAL SECTION DIRECTION DEPTH DEG MIN COORDINATES CLOSURES D I STANCE ANGLE DD MM SS DOG - LEG SEVERITY DEG/100 FT. 9872 70.18 9966 73.00 10061 75,48 10274 77.18 10365 77,18 10459 77.18 106421 76.42 10740 75,48 10896 76.24 11085 78.48 11178 80.12 11245 80.12 11272 80.18 BOTTOM HOLE CLOSURE: PRINTED : 3 0CT, 1984 9:53:25 PM 8497.38 2853.95 N 30,06 E 2267.54 N 1741.63 E 8526.97 2941.12 N 27.18 E 2345.80 N 1784.47 E 8552.52 3030.01 N 27.18 E 2427.11 N 1826.44 E 8602.06 3230.66 N 25.54 E 2612.34 N 1919.20 E 8622,07 3316.23 N 25.12 E 2692.43 N 1957.49 E 8642,73 3404.09 N 23.30 E 2775.97 N 1995.29 E 8683.90 3574.14 N 23.30 E 2939.50 N 2066.40 E 8707.19 3664.75 N 22.48 E 3027.02 N 2103.82 E 8744.67 3807.72 N 20.42 E 3167.67 N 2159.93 E 8785.25 3981.23 N 21.24 E 3339.95 N 2226.23 E 8802.20 4067.82 N 23.06 E 3424.58 N 8813.61 4130.39 N 21,42 E 3485.62 N 8818.18 4155.49 ' ' N 21.24 E 3510.37 N 4194.44 FEET AT N 33 11 5 E 2260.86 E 2286.02 E 2295.79 E 2859.20 N 37 31 36 E 2947.39 N 37 15 38 E 3037.55 N 36 57 43 E 3241.55 N 36 18 12 E 3328.80 N 36 01 06 E 3418.66 N 35 42 27 E 3593.14 N 35 06 22 E 3686.31 N 34 47 59 E 3833.99 N 34 17 19 E 4013.90 N 33 41 07 E 4103.56 N 33 25 56 E 4168.38 N 33 15 30 E 4194.44 N 33 11 05 E COPYRIGHT (C) 1984 ABACUS COMPUTER SERVICE 911W. 71st AVENUE ANCHORAGE, AK. 99502 ( 907 ) 344-0761 3.031 4.030 2.947 0.951 0.751 1.764 0.328 1.151 1.362 1.320 2. 344 '-~. 059 1. 156 Directional Services Pressure Services Chemical Transmission Systems --_,anuarv 22. !985 P. 0. Box :$6() .Ar~.(::horage,, A:i. a~.F:a Our Boss ;-,vrc)scopi c .-..~:...,..~ vev J ob No. A.K.-.-BO-'~C~-':")85 We11: 15-8 Field: Prudhoe Bay A! aska Surve--?-' Date: Oct. ober' :}.11~ 1".'i,:'~}:~4. Pir~ Ruedr'ich: Boss Gyro~coo.ic }'duit.~sho'l:. Sur"vey on the above well AJ.]. m~,~r~.~r'i de~:~'b, hs (r-om 9684 to !]..:2~=; are .from Eastma[~'=. . ....................... . ...... Si ncerel y, NL .'SPERRY-SUN . Ken Br'oussa. rd District Manager iF.] r',. c iL c:, s u r- e s NL Sperry-Sun/NL Industries, Inc. P.O. Box 6207, Anchorage, AK 99502-0207 (907) 563-3430 F £ S 1985 Alaska Oil 'q'/~/'i.3t~,L,'~~'' ~'cffrlm, iSaiol? ARCO ALASKA, ~1518 PRUDHOEBAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN COURSE DIRECTION DEGREES DOG-LEG SEVERITY DEG/IO0 0 0.00 -71.00 0 0 100 100.00 29.00 0 16 200 200-00 129'00 ' 0 17 300 300.00 229.00 0 16 400 400.00 329.00 0 19 500 499.99 428.99 0 19 600 599.99 528.99 0 17 700 699.99 628.99 0 18 800 799.99 728.99 0 11 900 899.99 828.99 0 7 1000 999.99 928.99 0 11 1100 1099.99 1028.99 0 9 1200 1199.99 1128.99 0 11 1300 1299.99 1228.99 0 4 1400 1399.99 1328.99 0 5 1500 1499.99 1428.99 0 7 1600 1599.99 1528.99 0 7 1700 1699.99 1628.99 0 7 1800 1799.99 1728.99 0 18 1900 1899.99 1828.99 0 22 2000 1999.98 1928.98 0 25 2100 2099.98 2028.98 0 30 2200 2199.97 2128.97 0 34 2300 2299.97 2228.97 0 37 2400 2399.96 2328.96 0 31 2500 2499.96 2428.96 0 22 2600 2599.96 2528.96 0 17 2700 2699.96 2628.96 0 21 2800 2799.96 2728.96 0 24 2900 2899.95 2828.95 0 22 O. 0 E 63.5O W 64.80 W 63.30 W 58.39 W 73.80 W 64.10 W 61.69'W 42.39 W 81.10 E 89.19 E 83.69 E 76.50 E 6.30 W S14. OW 5.19 E 18.60 W 10.19 W S24. OE 50.60 E 76,50 E 79.89 E 77.19 E 84.30 E 73.19 E 47.5O E O. O0 0.27 O. 03 O. 03 O. 06 O. 09 O. 07 O. 03 0.13 O. 30 O. 08 O. 04 O. 04 O. 22 O. 03 O. 06 O. 06 O. 03 0.21 0.17 0.19 O. 08 O. 08 0.10 0.15 0.'25 68. 0 E ............... 0;-'14 35.80 E O. 19 26.30 E 0.08 17.89 E 0.07 PAGE I DATE OF SURVEY OCTOBER 31, 1984 BOSS GYROSCOPIC SUR'VEV ................ JOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SEE[ERS .......... TOTAL ............................ RECTANGULAR COORDINATES VERTICAL NORTH/SOUTH EAST/WEST SECTION O. O0 O. O0 O. O0 0.11 S 0.21 W -0.20 O. 32 S ......... 0,-65' W ............. '0' 6'I 0.53 S 1.09 W -1.03 0.78 S 1.54 W -1.48 1.01 S 2.05 W -1.94 1.20 S 2.56 W -2.37 1.44 S 3.02 W -2.81 1.69 S 3.36 W -3.21 1.80 S 3.38 W -3.31 1.78 S 3.11 W -3.16 1.77 S 2.80 W -2.98 1.71 S 2.50 W -2.78 1.73 S 2.35 W -2.71 1.87 S 2.38 W -2.84 2.06 S 2.38 W -3.01 2.28 S 2.41 W -3.21 2.50 S 2.47 W -3.42 2.85 S 2.38 W -3.68 3.29 S 2.02 W -3.87 3.59 S 1.41 W -3.79 3.75 S 0.61 W -3.51 3.94 S 0.30 E -3.18 4.10 S 1.33 E -2.78 4.29 S 2.32 E -2.42 4.64 S 3.00 E -2.35 4.96 S 3.48 E -2.37 5.31 S 3.89 E -2.45 5.87 S 4.23 E -2.75 6.49 S 4.49 E -3.14 ARCO ALASKA, 15-8 PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 VERTICAL SECTION CALCULATED ALONG CLOSURE PAGE 2 DATE OF SURVEY OCTOBER 31, 1984 BOSS GYROSCOPIC SURVEY .... dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELL£RS TRUE ..... SUB~A COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN COURSE DOG-LEG DIRECTION SEVERITY DEGREES DEG/IO0 TOTAL RECTANGULAR COORDINATES VERTICAL NORTH/SOUTH EAST/WEST SECTION 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 430O 4'400 4500 4600 4700 4800 4900 '5000 5100 5200 53OO 5400 5500 5600 5700 ~800 5900 2999.95 2928.95 0 29 3099.95 3028.95 0 29 3199.94 3128.94 0 25 3299.94 3228.94 0 23 3399.94 3328.94 0 20 3499.94 3428.94 0 17 3599.94 3528.94 0 13 3699.94 3628.94 0 10 3799.94 3728.94 0 11 3899.93 3828.93 0 21 3999.93 3928.93 0 21 4099.93 4028.93 0 26 4199.93 4128.93 0 26 4299.92 4228.92 0 23 4399.92 4328.92 0 27 4499.91 4428.91 0 30 4599.91 4528.91 0 36 4699.90 4628.90 0 48 4799.89 4728.89 0 37 4899.89 4828.89 0 31 4999.89 4928.89 0 36 5099.88 5028.88 0 33 5199.88 5128.88 0 36 5299.87 5228.87 0 39 5399.87 5328.87 0 20 5499.87 5428.87 0 18 5599.84 5528.84 2 26 5699.55 5628.55 6 1 5798.56 5727.56 9 55 5896.53 5825.53 13 8 S 11.30 E 0.13 S 8.50 E 0.03 S 0.30 W 0.10 S 17.50 W 0.13 S 24. 0 W 0.07 S43. OW 0.12 S 65.10 W 0.12 S 82.30 W 0.08 N36. OW 0.19 N 58.8O W 0.19 N 56.89 W 0.03 N 67.50 W 0.11 N 62.69 W 0.04 N 53.10 W 0.09 N 54.39' W N 75.80 W 0.19 N 68.19 W 0.12 N 67.69 W 0.20 N 58.39 W 0.21 N 18.89 W 0.40 N 25. 0 W O. 10 N 33.19 W 0.10 N 26.10 W 0.09 N 30. 0 W ....... 0~'07 N 73.39 W 0.47 N 71.10 W O.O5 N'48.30 E ...................... 2;60 N 44.10 E 3.60 N 39.50 E 3.95 N 39.30 E 3.21 7.22 S 4.67 E -3.66 8.06 S 4.82 E -4.30 8.85 S 4,88 E -4.94 9.54 S 4.77 E -5.58 10.14 S 4.55 E -6.20 10.59 S 4.26 E -6.74 10.86 S 3.91 E -7.15 10.96 S 3.59 E -7.41 10.85 S 3.34 E -7.44 10.55 S 2.99 E -7.38 10.22 S 2.46 E -7.38 9.91 S 1.84 E -?',"44' ' 9.58 S 1.15 E -7.53 9.20 S 0.53 E -7.53 '8.77 S 0.06 W -7.48 8.43 S 0.81 W -7.59 8.13 S 1.73 W -7.81 7.67 S 2.86 W -8.02 7.12 S 3.96 W -8.14 6.40 S 4.58 W -7.85 5.48 S 4.95 W -7.27 4.60 S 5.44 W -6.77 3.72 S 5.93 W -6.30 2.76 S 6.44 W -5.7~ 2.19 S 7.01 W -5.56 2.02 S 7.54 W -5.70 0.52 S 6.20 W -3.'72 4.67 N 0.96 W 3.46 15.10 N 8.19 E 17.15 30.56 N 20.87 E 36.97 ARCO ALASKA, I5~8 PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 VERTICAL SECTION CALCULATED ALONG CLOSURE PAGE 3 DATE OF SURVEY OCTOBER 31, 1984 BOSSGYROSCOPIC SURLY dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELL£~ ........... TRUE SUB'SEA COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN COURSE DOG-LEO DIRECTION SEVERITY DEGREES DEG/IO0 TOTAL ....................... RECTANGULAR COORDINATES VERTICAL NORTH/SOUTH EAST/WEST SECTION 6000 5993.31 5922.31 15 59 6100 6089.26 6018.26 16 42 6200 6184.55 6113.55 18 34 6300 6278.65 6207.65 20 55 6400 6371.21 6300.21 23 31 6500 6461.99 6390.99 26 3 6600 6550.98 6479.98 28 10 6700 6637.86 6566.86 31 9 ............ 6800 6722.'24' 6651.24 33 44 6900 6803.78 6732.78 36 58 7000 6882.08 6811.08 39 55 7100 6957.42 6886.42 42 16 7200 7029.86 6958.86 44 52 7300 7098.91 7027.91 47 46 7400 7164.06 7093.06 50 54 7500 7225.18 7154.18 53 44 7600 7282.05 7211.05 56 55 7700 7336.37 7265.37 57 15 7800 7390.45 7319.45 57 16 7900 7444.69 7373.69 57 1 8000 7499.48 7428.48 56 31 8100 7554.84 7483.84 56 15 8200 7610.61 7539.61 55 56 8300 7666.98 7595.98 55 26 8400 7724.00 7653.00 55 1 8500 7781.99 7710.99 54 6 8600 7840.71 7769.71 53 58 8700 7900,01 7829.01 53 16 8800 7960.26 7889.26 52 37 8900 8021.57 7950.57 51 45 N 35.80 E 2.98 N 30.19 E 1.73 N 28.89 E 1.90 N 29.89 E 2.37 N 31.19 E 2.65 N 32.19 E 2.57 N 32.30 E 2.12 N 32.60 E 2.98 N 33.30 E 2.61 N 33.19 E 3.24 N 33.39 E 2.95 N 33.89 E 2.37 N 34. 0 E 2.59 N 34.60 E 2.93 N 35. 0 £ 3.15 N 35.60 E 2.87 N 36.19 E 3.23 N 36.10 E 0.34 N 35.89 E 0.17 N 36.10 E 0.29 N 36.1.g E 0.52 N 36.50 E 0.36 N 36.50 E 0.32 N 36.60 E 0.'51 N 36.60 E 0.42. N 36.60 E 0.92 N 36.69 N 36.69 E 0.70 N 36.80 E 0.66 N 36.50 E O. 50.53 N 36.13 E 74.12 N 51.42 E 100.49 N 66.35 E 129.91 N 82.94 E 162.46 N 102.18 E 198.12 N 124.23 E 236.66 N 148.55 E 278.43 N 175.11 E 323.44 N 204.30 E 371.83 N 236.03 E 423.80 N 270.17 E 478.52 N 306.60 E 535.69 N 345.09 E 595.42 N 385.85 E 657.70 N 429.14 E 722.29 N 474.88 E 788.90 N 523.11E 856.69 N 572.63 E 924.74 N 622.08 E 992.71 N 671.46 E 1060.25 N 720.80 E 1127.33 N 770.17 E 1194.05 N 819.54 E 1260.41N 868.73 E 1326.35 N 917.70 E 1391.76 N 966.28 E 1456.70 N 1014.59 E 1521.26 N 1062.71E 1585.21 N 1110.47 E 1648.58 N 1157.62 E 61.99 90.10 120.37 154.12 191.92 233.84 279.42 328.91 382.55 440.40 502.57 568.26 637.14 709.39 785.14 864.14 946.18 1029.9I 1113.81 1197.60 1281.03 1364.06 1446.79 1529.12 1610.99 1692.18 1772.85 1853.08 1932.61 2011.33 ARCO ALASKA, INC. 15-8 PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 VERTICAL SECTION CALCULATED ALONG CLOSURE PAGE 4 DATE OF SURVEY OCTOBER 31, 1984 BOSS GYROSCOPICSURVEY ........... dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELLERS TRUE ...... SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH COURSE COURSE DOG-LEG TOTAL INCLINATION DIRECTION SEVERITY RECTANGULAR COQRDINATES VERTICAL DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 9000 8082.87 8011.87 9100 8141.81 8070.81 9200 8196.94 8125.94 9300 8249.66 8178.66 9400 8301.29 8230.29 9500 8352.21 8281.21 9600 8403.13 8332.13 9684 8441.71 8370.71 '9717 8454.89 8383.89 9810 8487.84 8416.84 9902 8517.41 8446.41 ~995 8545.37 8474.37 10088 8569.05 8498.05 10180 8588.76 8517.76 10273 8607.70 8536,70 10366 8628.02 8557.02 10458 8648.52 8577.52 10551 8669.05 8598.05 10644 8689.97 8618.97 10737 8711.68 8640.68 10829 8733.55 8662.35 10922 8755.26 8684.26 11015 8776.77 8705.77 11107 87~5.50 8724.50 11200 8812.05 8741.05 11248 8820.28 8749.28 ...... 1'1345 8836.70" 8765.70 52 37 N 36.69 E 0.88 1712.00 N 1204.72 E 2090.06 55 8 N 36.39 E 2.53 1776.88 N 1252.81E 2170.56 57 54 N 35.89 E 2.83 1844.24 N ' 1302.02 E 2253.75 58 25 N 35.69 E 0.52 1913.16 N 1351.72 E 2338.52 59 23 N 35.19 E 1.05 1982.92 N 1401.39 E 2423.99 59 23 N 35.19 E 0.03 2053.25 N 1451.00 E 2509.91 59 23 N 35.19 E 0.03 2123.58 N 1500.61E 2595.84 65 53 N 35. 0 E 7.75 2184.59 N 1543.48 E 2670.29 67 0 N 34.50 E 3.61 2209.44 N 1560.72 E 2700.50 71 30 N 32.50 E 5.24 2281.95 N 1608.69 E 2787.40 71 0 N 30.50 E 2.13 2356.22 N 1654.20 E 2874.51 74 0 N 29.50 E 3.38 2433.02 N 1698.54 E 2963'I4 76 30 N 28.50 E 2.88 2511.68 N 1742.13 E 3052.95 78 45 N 27.50 E 2.67 2591.00 N 1784.31E 3142.59 77 45 N 27. O'E '1'20' 2671.95 N 1826.00 E 3233.33 77 0 N 26.50 E 0.96 2752.98 N 1866.84 E 3323.72 77 15 N 26. 0 E 0.60 2833.42 N 1906.51E 3412.97 77 15 N 25.50 E 0.52 2915.12 N 1945.92 E 3503.15 76 45 N 25. 0 E 0.75 2997.08 N 1984.57 E 3593.16 76 15 N 24. 0 E 1.18 3079.36 N 2022.07 E 3682.83 76 30 N 23.50 E 0.59 3161.20 N 2058.08 E 3771.34 76 15 N 23.50 E 0.27 3244.08 N 2094.12 E 3860.75 77 0 N 23. 0 E 0.96 3327.21N 2129.83 E 3950.19 79 30 N 22.50 E ...... 2,77 3410.26 N 2164.66 E 4039, I0 80 0 N 23. 0 E 0.75 3494.65 N 2200.05 E 4129.45 80 15 N 23.50 E 1.15 3538.10 N 2218.71E 4176.20 80 15 N 23.50 E ..................... 0~"00 3625.77 N 2256.83 E 4270.77 HORIZONTAL DISPLACEMENT = 4270.77 FEET AT NORTH 31 DEG. 53 MIN. EAST AT MD = 11345 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ARCO ALASKA, .... 15-8 .... PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGE 5 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELLERS ...... INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFF£RENCE CORRECTION 0 0.00 -71.00 0.00 0.00 0.00 1000 999.99 928.99 1.78 S 3.11 W 0.01 0.01 2000 1999.98 1928.98 3.59 S 1.41W 0.02 0.01 3000 2999.95 2928.95 7.22 S 4.67 E 0.05 0.03 4000 3999.93 3928.93 10.22 S 2.46 E 0.07 0.02 5000 4999.89 4928.89 5.48 S 4.95 W 0.11 0.05 6000 5993.31 5922.31 50.53 N 36.13 E 6.69 6.58 7000 6882.08 6811.08 423.80 N 270.17 E 117.92 111.23 8000 7499.48 7428.48 1060.25 N 720.80 E 500.52 382.60 9000 8082.87 8011.87 1712.00 N 1204.72 E 917.12 416.61 10000 8546.74 8475.74 2437.21 N 1700.91 E 1453.26 536.13 11000 8773.39 8702.39 3313.76 N 2124.12 E 2226.61 773.35 11345 8836.70 8765.70 3625.77 N 2256.83 E 2508.30 281.69 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ARCO ALASKA, ~'I5-8 PRUDHOE BAY ALASKA MEASURED DEPTH 0 71 171 271 371 471 571 671 771 871 971 1071 1171 1371 1471 1571 1671 1771 INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGE 6 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELLERS INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 0.00 -71.00 0.00 0.00 0.00 71,00 ' 0.00 0.04 S' 0.09 W 0.00 171.00 100.00 0.26 S 0.52 W 0.00 271.00 200.00 0.47 S 0.97 W 0.00 371.00 300.00 0.70 S 1.40 W 0.00 471.00 400.00 0.96 S 1.89 W 0.01 571.00 500.00 1.14 S 2.43 W 0.01 671.00 600.00 1.36' S 2.88 W 0.01 771.00 700.00 1.61 S 3.30 W 0.01 871.00 800.00 1.81S 3.44 W 0.01 971.00 900.00 1.78 S 3.20 W 0.'01 1071.00 1000.00 1.77 S 2.88 W 0.01 1171.00 1100.00 1.73 S 2.60 W 0.01 1271.00 '1200.00 1.70 S 2.35 W 0.01 1371.00 1300.00 1.83 S 2.36 W 0.01 1471.00 1400.00 1.99 S 2.39 W 0.01 1571.00 1500.00 2.22 S 2.39 W 0.01 1671.00 1600.00 2.43 S 2.45 W 0.01 1771.00 1700.00 2.71 S 2.44 W 0.01 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. 00' O. O0 O. O0 O. O0 O. O0 O. O0 .) ARCO ALASKA, 15~8 PRUDHOE BAY ALASKA MEASURED DEPTH INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 'PAGE 7 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SEIiLERS ...... INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE VERTICAL DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 1871 1971 2071 2171 2271 2371 2471 2571 2671 2771 2871 2971 3071 31'71 3271 3371 3471 3571 3671 1871.00 1971.00 2071.00 2171.00 2271.00 2371.00 2471.00 2571.00 2671.00 2771.00 2871.00 2971.00 3071.00 3171.00 3271.00 3371.00 3471.00 3571.00 3671.00 1800.00 3.18 S 2.17 W 0.01 1900.00 3,54 S 1.62 W 0.02 2000.00 3.71S 0.86 W 0.02 2100.00 3.87 S 0.02 E 0.02 2200.00 4.07 S 1.01 E 0.03 2300.00 4.21 S 2.07 E 0.03 2400.00 4.52 S 2.86 E 0.04 2500.00 4.90 S 3.34 E 0.04 2600.00 5.16 S 3.79 E 0.04 2700.00 5.69 S 4.14 E 0.04 2800.00 6.32 S 4.43 E 0.05 2900.00 6.98 S 4.62 E 0.05 3000.00 7.82 S 4.78 E 0.05 3100.00 8.64 S 4.88 E 0.06 3200.00 9.35 S 4.83 E 0.06 3300.00 9.98 S 4.62 E 0.06 3400.00 10.49 S 4.36 E 0.06 3500.00 10.81 S 4.01 E 0.06 3600.00 10.95 S 3.67 E 0.06 O. O0 O. O0 O. O0 O. O0 0.01 0.01 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 ARCO ALASKA, 15-8 PRUOHOE BAY ALASKA MEASURED DEPTH 3771 387'1 3971 4071 4171 4271 4371 4471 4571 4671 4771 4871 4971 5071 5171 5271 5371 5471 5571 INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGE 8 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SELLERS' INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE VERTICAL DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 3771.00 3871.00 3971.00 4071.00 4171.00 4271.00 4371.00 4471.00 4571.00 4671.00 4771.00 4871.00 4971.00 5071.00 5171.00 5271.00 5371.00 5471.00 5571.00 3700.00 10.92 S 3.40 E 0.06 3800.00 10.65 S 3.14 E 0.07 3900.00 10.32 S 2.61E 0.07 4000.00 9.99 S 2.05 E 0.07 4100.00 9.68 S 1.34 E 0.07 4200.00 9.32 S 0.69 E 0.08 4300.00 8.90 S 0.13 E 0.08 4400.00 8.49 S 0.56 W 0.09 4500.00 8.24 S 1.44 W 0.09 4600.00 7.82 S 2.48 W 0.09 4700.00 7.28 S 3.70 W 0.11 4800.00 6.65 S 4.49 W 0.11 4900.00 5.76 S 4.82 W 0.11 5000, O0 4.83 S 5.29~' W ..... 0.'12 5100.00 3.99 S 5.80 W 0.12 5200.00 3.05 S 6.28 W 0.12 5300.00 2.23 S 6.85 W 0.13 5400.00 2.07 S 7.40 W 0.13 5500.00 1.21S 6.95 W 0.14 O. O0 O, O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 0.01 O. GO O. GO O. GO O. OO O. GO 0. O1 O. GO 0. O1 ARCO ALASKA, .... 15-8 ~ PRUDHOE BAY ALASKA MEASURED DEPTH 5671 5772 5873 5976 6080 6185 6291 6399 6510 6622 6738 6859 6985 7118 7258 7411 7579 7764 7948 INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGE 9 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SE[LE]~S ..... INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE VERTICAL DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 5671.00 '5771,00 5871,00 5971.00 6071.00 6171.00 6271.00 6371.00 6471.00 6571.00 6671,00 6771.00 6871,00 6971.00 7071.00 7171.00 7271.00 7371.00 7471.00 5600.00 2,73 N 2.86 W 0.32 5700.00 11,64 N 5.28 E 1.07 5800.00 26,12 N 17.24 E 2,83 5900.00 45.49 N 32,45 E 5.84 6000.00 69.39 N 48.66 E 9.93 6100.00 96.51 N 64.15 E 14.71 6200.00 127,37 N 81.49 E 20.81 6300.00 162.38 N 102.14 E 28.77 6400.00 201,85 N 126.58 E 39,03 6500.00 245.87 N 154.38 E 51.79 6600.00 295.62 N 186.17 E 67.94 6700.00 351.68 N 222.83 E 88.32 6800.00 416.14 N 265.12 E 114.61 6900.00 488.86 N 313.55 E 147.44 7000,00 570,60 N 368.80 E 187.94 7100.00 664.76 N 434.10 E 240.07 7200.00 775.36 N 513.23 E 308.93 7300.00 900.23 N 604.34 E 393.03 7400.00 1025.42 N 695.32 E 477.29 0.18 0,75 1.77 3.00 4,10 4.77 6.11 7.95 10.26 12.77 16,15 20.38 26,29 32.83 40.50 52.13 68.86 84.10 84.26 ARCO ALASKA, 15-8 PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGEIO · DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, MEASURED D£PTH INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFF£~RENCE CORRECTION 8129 7571.00 7500.00 1146.78 N 784.56 E 558.10 80.81 ~8307 7671.00 7600.00 1265-10 N 872.21 E 6~6.09 77.99 8481 7771.00 7700.00 1379.58 N 957.23 E 710.27 74.17 8651 7871.00 7800.00 1490.00 N 1039.42 E 780.41 70.14 8817 7971.00 7900.00 1596.47 N 1118.89 E 846.70 66.29 8980 8071.00 8000.00 1699.54 N 1195.43 E 909.44 62.74 9152 8171.00 8100.00 1811.64 N 1278.31 E 981.07 71.63 9340 8271-00 8200.00 1941.38 N 1372.00 E 1069.78 88.71 9536 8371.00 8300.00 2079.20 N 1469.31 E 1165.90 96.12 9760 8471.00 8400.00 2242.55 N 1583.08 E 1289.08 123.18 100~6 '8571.00 8500.00 2518.84 N 1746.02E 1525.38 236.30 10559 8671.00 8600.00 2922.92 N 1949.64 E 1888.86 363.48 10989 8771.00 8700.00 3304.20 N 2120.07 E 2218.35 329.49 1i345' 8836.70 8765.70 3625.77 N -- 225~.83£ 2508.30 289,95" THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN .... THE'NEAREST 20 FOOT MD (FROM RADIUS OF CURVATURE~ POINTS ARCO ALASKA, INC. ............. 1'5'8 PRUDHOE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY PAGE~I~I ANCHORAGE ALASKA DATE OF SURVEY OCTOBER 31, 1984' 'COMPUTATIONDATE NOVEMBER 2, 1984 dOB NUMBER AK-BO-40085 KELLY BUSHING ELEV. = 71.00 FT. OPERATOR-SAMEC, SE~LE]~S ........... MEASURED DEPTH INTERPOLATED VALUES FOR SPECIAL SURVEY POINTS TRUE VERTICAL DEPTH SUB-SEA VERTICAL DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MARKER 9222 9298 9350 9371 '9424 9700 9731 9947 10713 11170 11190 11345 8208.62 8248,61 8275.83 8286.53 8313.51 8448.24 8460.29 8531.52 8705.97 8806.84 8810.31 8836.70 8137.62 8177~"61 8204.83 8215.53 8242.51 8377.24 8389.29 8460.52 8634.97 8735.84 8739.31 8765.70 1859.35 N 19II.78N 1947.76 N 1962.53 N 1999.80 N 2196.55 N 2220.11N 2393.13 N 3058.06 N 3467.46 N 3485.59 N 3625.77 N 1312.95 E 1350.73 E 1376.58 E 1387.00 E 1413.29 E 1551.86 E 1568.01E 1675'73 E 2012.59 E 2188.50 E 2196.20 E 2256.83 E TOP SAG TOP SHUBLIK A TOP SHUBLIK B TOP SHUBLIK C SADLEROCHIT SURVEY DEPTH TOP ZONE 3 TOP ZONE 2 TOP ZONE lB BASE SADLEROCHIT PLUG BACK TD TOTAL DEPTH DRILLER MARKER ARCO ALASKA, INC. 15-8 STRATIGRAPHIC SUMMARY DERIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA MEASURED DEPTH ....... TVD THICKNESS BKB BKB SUB-SEA VERTICAL TOP SAG 9222 ....... TOP SHUBLIK A 9298 TOP SHUBLIK B 9350 TOP SHUBLIK C 9371 ............ TOP SADLEROCHIT 942'4 TOP ZONE 3 9731 TOP ZONE 2 9947 TOP ZONE lB 10713 BASE SADLEROCHIT 11170 PLUG BACK TD 11190 TOTAL DEPTH DRILLER 11345 8208.62 8137.62 8248"61 8177.61 8275.83 8204.83 8286.53 8215.53 831'3.5I 8242.51 8460.29 8389.29 8531.52 8460.52 8705.97 8634.97 8806.84 8735.84 8810.31 8739.31 8836.70 8765.70 C'~RDI-NATE$ WITH REF. TO WELLHEAD (ORIGIN-1645FNL 1378FWL) SEC 22---T//'N--'Rl"4E 1859.35N 1312.95c ) 1911.78N 1'350',73E 1947.76N 1376.58E 1962.53N 1387.00E .I999.80N '1413.29E 2220.11N 1568.01E 2393.13N 1675.73E 3058.06N 2012.59E 3467.46N 2188.50E 3485.59N 2196.20E 3625.77N 2256.83E 1) FROM LINEAR EXTRAPOLATION BELOW DEEPEST STATION. 2) COMPUTER PROGRAM - SPERRY SUN THREE DIMENSIONAL RADIUS OF CURVATURE. DATA'CALCULATION AND INTERPOLATION BY RADIUS O~ CI~VATURE ..... COMPUTATION DATE NOVEMBER 2, 1984 DATE OF*' ~e~URVEY OCTOBER 31, 1984 dOB NUMBER AK-BO-40085 KELt::Y-B~I~I NG ELEV. = 71 . O0 FT. TRUE NORTH 5CRLE :- ! INCH TO 1000.00 / 1000.0 PRUOHOE 8RT qRCO qLqsKq. 15-8 OCTOBE~ 3~, qK-80-40085 !NC. 1984 I -1000. OO -3000.00 p2ooo, oo 11945 I I 1000. O0 2000.00 -!000.00 HORIZONTFtL PROJECT ]; Clhl 0.00 5CRLE .- I INCH TO 2000.00 / 2000.0 PRUOHOE 8RT qRCO qLRSKC. t5-8 OCTOBER qK-80-40085 !NC. L9~4 2000.00 4000.00 G030.30 8000.00 lO000. O0~ I 2000. O0 4000. O0 I 6000. O0 VERT I CR, L PROJECT I ON Directional Services Pressure Services ChemiCal Transmission Systems February 12, 1985 Mr. Randy Ruedrich ARCO Alaska~ Inc. P. O. Box 360 Anchorage~ Alaska 99510 Re: Our Boss Gyroscopic Survey Job No. AK-BO-40085 Well: 15-8 (SEC 22 TIlN R14E) Field: Prudhoe Bay Alaska Survey Date: October 31, 1984 Operator: Samec, Sellers Mr. Ruedrich: Please find enclosed the "Original" and one (I) copy of our Boss Gyroscopir Multishot Survey on the above well. Boss Gyro. survey stations at 9500~ and 9600' of measured depth were deleted per request of Joe McGregor. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard District Manager Enclosures NL Sperry-Sun/NL Industries, Inc. P.O. Box 6207, Anchorage, AK 99502-0207 (907) 563-3430 SPERRY~SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA ARCO ALASKA, INC. ...... i5=8 PRUDHOE BAY ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE COMPUTATION DATE NOVEMBER 2, 1984 DATE OF SURVEY OCTOBER 31, BOSS GYROSCOPIC' dOB NUMBER Al KELLY BUSHING ELEV OPERATOR'SAMEC; I~ ¥ 1984 O0 FT. .... TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN 0 0.00 -71.00 0 0 100 100.00 29.00 0 16 .................... 200 200.00 129.00 0 17 300 300.00 229.00 0 16 400 400.00 329.00 0 19 500 499.99 428.99 0 19 600 599.'99 528.99 0 17 700 699.99 628.99 0 18 800 799.99 728.99 0 11 900 899.99 828.99 0 7 1000 999.99 928.99 0 11 .............. 1100 1099.99 1028.99 0 9 1200 1199.99 1128.99 0 11 1300 1299.99 1228.99 0 4 .... 1400 1399.99 1328.99 0 5 1500 1499.99 1428.99 0 7 1600 1599.99 1528.99 0 7 ...... 1700 1699.99 1628.99 0 7 1800 1799.99 1728.99 0 18 1900 1899.99 1828.99 0 22 2000 1999.98 1928.98 0 25 2100 2099.98 2028.98 0 30 2200 2199.97 2128.97 0 34 2300 2299.97 2228.97 0 37 2400 2399.96 2328.96 0 31 2500 2499.96 2428.96 0 22 ................. 2600 2599.96 2528.96 0 17 2700 2699.96 2628.96 0 21 2800 2799.96 2728.96 0 24 2900 2899.95 2828.95 0 22 COURSE DIRECTION DEGREES O. 0 63.50 64.80 63.30 58.39 73.80 64.10 61.69 42.39 81.10 89.19 83.69 76.50 6.30 14. 0 5.19 18.60 10.19 S24. 0 50.60 76.50 79.89 77.19 84.30 73.19 47.50 68. 0 35.80 26.30 17.89 E W W W W W W W W E E E E W W E W W E E E E E E E E E E E E DOG-LEG SEVERITY DEG/iO0 O. O0 0.27 0.03 O. 03 0.06. 0.09 0.07 0.03 0.13 0.30 0.08 O. 04 O, 04 O. 22 O. 03 O. 06 O. 06 O. 03 0.21 0.17 0.19 O. 08 O. 08 0.10 0.15 O. 25 0'-'14 0.19 O. 08 0.07 RECTANGULAR COORD I NATES : ...,:~.,.ERT I C: I NORTH/SOUTH ) O. O0 O. O0 O. O0 0.11 S 0.21 W -0.20 O. 32 S 0,'65 W .................."-'"0 ;"6I ........ 0.53 S 1.09 W -1.03 0.78 S 1.54 W -1.48 1.01 S 2.05 W -1.94 1.20 S 2.56 W -2.37 1.44 S 3.02 W -2.81 1.69 S 3.36 W -3."'2I' ' 1.80 S 3.38 W -3.31 1.78 S 3.11 W -3.16 1.77 S 2.80 W ................ ='2;'98 ........ 1.71 S 2.50 W -2.78 1.73 S 2.35 W -2.71 1.87 S 2.38 W .......... ~-2'"8~"' i 2.06 S 2.38 W -3.0. 2.28 S 2.41 W -3.21 2.50 S 2.47 W .............. =3;-zF2- ........ 2.85 $ 2.38 W -3.68 3.29 S 2.02 W -3.87 3.59 S I. 41 W ....................... --~;-?~;~ ....... 3.75 S 0.61 W -3.51 3.94 S 0.30 E -3.18 4.10 S 1.33 E ......... '-2;7'8 ...... 4.29 S 2.32 E -2.42 4.64 S 3.00 E -2.35 4.96 S :3.48 E ............. ~-2,'~ 5.31 S 3.89 E -2.45 5.87 S 4.23 E -2.75 6.49 S 4.49 E ........... -3,"1"4" ARCO ALASKA, 15~8 PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYINGCOMPANY ANCHORAGE ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE ~UB-b-'EA COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN 3000 2.999.95 2928.95 0 29 3100 30.99.95 3028.95 0 29 ............ ,~200 3199.94 3128.94 0 25 3300 3299.94 3228.94 0 23 3400 339.9.94 3328.94 0 20 3500 3499,94 3428..94 0 17 3600 3599.94 3528.94 0 13 3700 36.99.94 3628.94 0 10 3800 3799.94 3728.94 0 11 3900 38.99.93 3828.93 0 21 4000 399.9..93 3928.93 0 21 4200 4199.93 4128.93 0 26 4300 4299.92 4228.92 0 23 4400 4399.92 4328.92 0 27 4500 4499.91 4428.91 0 30 4600 4599.91 4528.91 0 36 .................... 4700 4699.90 4628.90 0 48 4800 4799.89 4728.89 0 37 4900 4899.89 4828.89 0 31 ........................ 5000 4~'8~ 4928'89 0 36 5100 5099.88 5028.88 0 33 5200 5199.88 5128.88 0 36 ....................... 5300 5299.87 5228.87 0 39 5400 5399.87 5328.87 0 20 5500 5499.87 5428.87 0 18 5600 5599.84 5528.84 2 26 5700 5699.55 5628.55 6 1 5800 5798.5& 5727.56 9 55 ............. 5900 5896.53 5825.53 13 8 COMPUTATION DATE NOVEMBER 2, 1984 COURSE DOO-LEG DIRECTION SEVERITY DEGREES DEG/IO0 S 11.30 E 0.13 S 8.50 E 0.03 S 0.30 W O. 10 S 17.50 W 0.13 S24. OW 0.07 S43. OW 0.12 S 65.10 W 0.12 S 82.30 W 0.08 N36. OW 0.19 N 58.80 W O. 1.9 N 56.8.9 W 0.03 N 67.50 W 0.11 N 62.69 W 0.04 N 53.10 W 0.09 N 54.3.~- W O. 06 N 75.80 W 0.1.9 N 68.1.9 W 0.12 N 67.69 W 0.20 N 58.3.9 W 0.21 N 18.8.9 W 0.40 N 25. OW 0.10 N 33.19 W 0.10 N 26.10 W 0.09 N 30. 0 W .... 0.:'07 N 73.3.9 W 0.47 N 71.10 W 0.05 N 48.30 E .............. 2;60 N 44.10 E 3.60 N 39.50 E 3.95 N 39.30 E 3.21 DATE OF SURVEY OCTOBER 31, 1984 BOSS GYRO$CO'PI ,lOB NUMBER AK-BO-4008~:::,: KELLY BUSHING ELEV.:,~ i, O0 FT. OPERATOR-SAMEC, SE TOTAL RECTANGULAR NORTH/SOUTH 7.22 S 8.06 S 8.85 S .9.54 S 10.14 S 10.5.9 S 10.86 S 10.96 S 10.85 S 10.55 S 10.22 S 9.91 S 9.58 S 9.20 S 0.77 S 8.43 S 8.13 S 7.67 S 7.12 S 6.40 S 5.48 S 4.60 S 3.72 S 2.76 S 2.1.9 S 2.02 S 0.52 S 4.67 N 15.10 N 30.56 N COORDINATE~::. iCAL EAST/WEST'. ) 4.67 E -3.66 4.82 E -4.30 4.77 E -5.58 4.55 E -6.20 4.26 E -'6 ~'~ 74 3..91 E '7.15 3.5.9 E -7.41 3.34 E -~:~-;-4'4' ....... 2..99 E -7.38 2.46 E -7.38 1.84 'E ........................ ~'7.44 ......... 1.15 E -7.53 O. 53 E -7.53 ..... O, 06 W ...........~-~-4~"': ...... 0.81 W -7.5 ) 1.73 W -7.81 2.86 W .............. ~0';'02 .... 3.96 W -8.14 4.58 W -7.85 4.'.95 W ............. ---~:-2~ ....... 5.44 W -6.77 5.93 W -6.80 6.44 W ..... ~~ ......... 7.01 W -5.56 7.54 W -5.70 6 ,' 20 'W ----~,- ~ ...... 0..96 W 3.46 8. lC.;, E 17.15 ARCO ALASKA, PRUDHOE BAY ALASKA INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE 'SUB-S£A COURSE MEASURED VERTICAL VERTICAL INCLINATION DEPTH DEPTH DEPTH DEG MIN 6000 5993.31 5922.31 15 59 6100 6089.26 6018.26 16 42 ................. 6200 6184,55 6113.55 18 34 6300 6278.65 6207.65 20 55 6400 6371.21 6300.21 23 31 6500 6461.99 6390.99 26 3 6600 6550.98 6479.98 28 10 6700 6637.86 6566.86 31 9 6800 6722,24 6651,24 33 44 6900 6803,78 6732,78 36 58 7000 6882,08 6811,08 39 55 7100 6957,42 7200 7029,86 6958,86 44 52 7300 7098.91 7027,91 47 46 ?400 7164,06 7093,06 50 54 7500 7225,18 7154.18 53 44 7600 7282,05 7211,05 56 55 ........... 7700 7336,37 7265,37 57 15 7800 7390,45 7319,45 57 16 7900 7444,69 7373,69 57 1 8000 7499,48 7428,48 56 31 8100 7554,84 7483,84 56 15 8200 7610,61 7539,61 55 56 8300 7666,98 7595,98 55 26 8400 7724.00 7653,00 55 1 8500 7781,99 7710,99 54 8600 7840.71 7769,71 53 58 8700 7900,01 7829,01 53 16. 8800 7960.26 7889,26 52 37 8900 8021.57 7950,57 51 45 COMPUTATIONDATE NOVEMBER 2~ 1984 COUR$£ DIRECTION DEGREES N 35.80 E N 30.19 E N 28.89 E N 29.89 E N 31.19 E N 32.19 E N 32.30 E N 32.60 E N 33.30 E N 33.19 E N 33.39 E N 33.89 E N 34, 0 E N :34.60 'E N35. OE N 35.6O E N 36.19 E N 36.10 £ N 35.89 E N 36.10 E N 36.19 E N 36.50 E N 36.50 E N 36.60 E N 36.60 E N 36.60 E N 36.69 E N 36.6.9 E N 36.80 E N 36.50 E' DOG-LEO SEVER I TY DEG/1 O0 2.98 1.73 1.90 2.37 2.65 2.57 2.12 2.98 2.61 3.24 2.95 2.37 2.59 2.93 3.15 2.87 3.23 O. 34 0.17 0.29 O. 52 0.36 O. 32 0'51 0.42 O. 92 0.15 O. 70 O. 66 O. 90 DATE OF SURVEY OCTOBER 31, 1984 BOSS' GYROSCOPIC-SURVEY .... ,.lOB NUMBE~ KEELY BUSH I NG ELEV, :!i!.?ii~:.:iii.:!;ii~ii!;~i!~!'O0 FT, OPERATOR-SA'NEC,' .-~£~ ........................... TOTAL ....... RECTANGULAR COORDINAT[ NORTH/SOUTH ECTI OF, i) 50.53 N 74.12 N 100.49 N 129.91N 162.46 N 198.12 N 236.66 N 278.43 N 323.44 N 371.83 N 423.80 N 478.52 N 535.69 N 5~5.42 N 657.70 N 722.29 N 788.90 N 856.6~ N 924.74 N 992.71N 1060.25 N 1127.33 N 1194.05 N 1260.41N 1326.35 N 13~1.76 N 145~.70 N 1521.26 N 1585.21N 1648.58 N 36.13 E 61.99 51.42 E 90.10 ......... 66;'35"'£ ................... ~20¥37 82.94 E 102.18 E 124.23 E 148.55 E 175.11E 204.30 E 236.03 E 270.17 E 306.60 E 345. O9 E 385.85 E 429, I4 E' 474.88 E 523.11E 572.63 E 622.08 E 671.46 E 154.12 191.92 '233.84 279.42 328.91 382.55' 440.40 502.57 568.2~ 637.14 709.39 864.14 94~.18 'I029.'~I ....... 1113.81 1197.60 720,80 E ........ I281';'03 ' 770.17 E 1364.06 819.54 E 144&.79 868.73 E .... I52~',]2 .917.70 E 1610.99 966.28 E 1692.18 1014.59'E ..... I77'2~85 1062.71 E 1853.08 1110.47 E 1932.61 1157.62 E 2011;'33 SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA ARCO ALASKA, INC. PRUDHOE BAY ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE COMPUTATION DATE NOVEMBER 2, 1984 DATE OF SURVEY OCTOBER 31, 1984 · BOSS GYROSCOPIC-'~SURI dOB NUMBER AK- KELLY BUSHING ELEV.:~ i00 FT. OPERATOR-SAMEC, TRUE MEASURED VERTICAL DEPTH DEPTH 9000 8082.87 9100 8141.81 ....................... 9200 8196.94 9300 8249.66 9400 8301.29 9684 8431.72 9717 8444.90 9810 8477.85 9902 8507.42 9995 8535.38 10088 8559.06 10180 8578.77 10273 8597.71 10366 8618.04 ................. 10458 8638.54 10551 8659.06 10644 8679.98 10737 8701.69 10829 8723.36 10922 8745.27 ............. 11-015. 8766.78 11107 8785.51 11200 8802.06 ............... 11248 8810.29 11345 8826.71 SUB-SEA COURSE COURSE· DOO-LEG T'OYAL .... ' VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES. DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST:i:~! 8011.87 52 37 N 36.69 E 0.88 1712.00 N 8070.81 55 8 N 36.39 E 2.53 1776.88 N 8125.94 57 56 N 35.89 E 2.83 1844.24 N 8178.66 58 25 N 35.69 E 0.52 1913.16 N 8230.29 59 23 N 35.19 E 1.05 1982.92 N 8360.72 65 53 N 35. 0 E 2.29 2189.19 N 8373.90 67 0 N 34.50 E 3.61 2214.04 N 8406.85 71 30 N 32.50 E 5.24 2286.55 N 8436.42 71 0 N 30.50 E 2.13 2360.82 N 8464.38 74 0 N 29.50 E 3.38 2437.63 N 8488.06 76 30 N 28.50 E 2.88 2516.28 N 8507.77 78 45 N 27.50 E 2.67 2595.61 N 8526.71 77 45 N 27. 0 E 1.20 2676.55 N 8547.04 77 0 N 26.50 E 0.96 2757.59 N 8567.54 77 15 N 26. O-E 0.60 2838.02 N' 8588.06 77 15 N 25.50 E 0.52 2919.72 N 8608.98 76 45 N 25. 0 E 0.75 3001.68 N 8630.69 76 15 N 24. 0 E 1.18 3083.96 N 8652.36 76 30 N 23.50 E 0.59 3165.80 N 8674.27 76 15 N 23.50 E 0.27 3248.69 N 8695.78 77 0 N 23. 0 E 0.96 3331.81N 8714.51 79 30 N 22.50 E 2.77 3414.86 N 8731.06 80 0 N 23. 0 E 0.75 3499.25 N 8739.29 80 15 N 23.50 E 1.I5 3542.70 N 8755.71 80 15 N 23.50 E 0.00 3630.37 N !RTI CAL ) 1204.72 E 2090.06 1252.81E 2170.56 13~2.'02--E ........................ ~'~2~3-~--:~5- .............. 1351.72 E 2338.52 1401.39 E 2423.99 1546.34 E 2675.70 · 1563.58 E 2705.92 1611.55 E 2792.82 1657.06 E ..................... 2879~9~Z ....... 1701.40 E 2968.56 1744.99 E 3058.37 1787.16 E .... ~'I4~.-00 ..... 1828.85 E 3238.75 1869.70 E 3329.13 l~09.'~'E ................ 1948.77 E 3508.5~ 1987.43 E 3598.57 2024.93 E ....... 2060.94 E 3776.75 2096.98 E 3866.16 2132.6~'E ........... ~'~ ......... 2167.51E 4044.51 2202.90 E 4134.86 2221.57 E .... 2259.69 E 4276.19 .................... HORIZONTAL DISPLACEMENT = 4276.19 FEET AT NORTH 3I'-'DEO," 53 MIN. EAST AT MD = 11"345 ............................................ THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ARCO ALASKA, 15'8 PRUDHOE BAY ALASKA MEASURED DEPTH INC. spERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 PAGE"---5- DATE OF SURVEY OCTOBER 31, dOB NUMBER AK-BO-400 KELLY BUSHING ELEV. OPERATOR-SAMEC,' INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 1984 FT. ..i , 0 0.00 -71.00 0.00 0.00 0.00 ........... 1000 999.99 928.99 1.78 S 3.11 W 0.01 0,01 2000 1999.98 1928.98 3.59 S 1.41 W 0.02 0.01 3000 2999.95 2928.95 7.22 S 4.67 E 0.05 0.03 4000 3999.93 3928.93 10.22 S 2.46 E 0.07 0.02 5000 4999.89 4928.89 5.48 S 4.95 W 0.11 0.05 6000 5993.31 5922.31 50.53 N 36.13 E 6.69 6.58 7000 6882.08 6811.08 423.80 N 270.17 E 117.92 111.23 8000 7499.48 7428.48 1060.25 N 720.80 E 500.52 382.60 9000 8082.87 8011.87 1712.00 N 1204.72 E 917.12 416.61 ..... I'0000 8536.75 8465.75 2441.81 N 1703.76 E 1463.25 546.12 11000 8763.41 8692.41 3318.36 N 2126.98 E 2236.59 773.35 11345 8826.71 8755.71 3630.37 N 2259.69 E THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE 2518.29 281.69 DIMENSIONAL RADIUS OF CURVATURE METHOD. .) ARCO ALASKA, 15-8' PRUDHOE BAY ALASKA MEASURED DEPTH 0 ............................ 71 171 271 .......... 371 471 571 671 771 871 ........... 97'I 1071 1171 ............................. 1'271 1371 1471 ................... I571 1671 1771 ......................... I NC:. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 DATE OF SURVEY OCTOBER dOB NUMBER . KELLY BUSHING ELEV, OPERATOR-SAMEC, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE ]'RUE VERTICAL DEPTH VERTICAL CORRECTION' 1984 GO FT. 0.00 71.00 171,00 271.00 371.00 471.00 571.00 671.00 771.00 871.00 971.00 1071.00 1171.00 1271.00 1371.00 1471.00 1571.00 1671.00 1771.00 -71.00 0.00 0.00 0.00 0.00 0."04 S 0.09 W 0.00 100.00 0.26 S 0.52 W 0.00 200.00 0.47 S 0.97 W 0.00 300.00 0.70 S 1.40 W 0.00 400.00 0.96 S 1.89 W 0.01 500.00 1.14 8 2.43 W 0.01 600.00 1.36 S 2.88 W 0.01 700.00 1.61 S 3.30 W 0.01 800.00 1.81 S 3.44 W 0.01 900.00 1.78 S 3.20 W 0.01 1000.00 1.77 S 2.88 W 0.01 1100.00 1.73 S 2.60 W 0.01 1200.00 1.70 S 2.35 W 0.01 1300.00 1.83 S 2.36 W 0.01 1400.00 1.99 S 2.39 W 0.01 1500.00 2.22 S 2.39 W 0.01 1600.00 2.43 S 2.45 W 0.01 1700.00 2.71 S 2.44 W 0.01 O. O0 ' O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 "0.00 0.00 O. O0 O. O0 O. O0 O. O0 ARCO ALASKA, ............. I5=8 ......... PRUDHOE BAY ALASKA MEASURED .............. DEPTH 1871 1971 2071 2171 2271 2371 2471 .................... 2571 2671 2771 2871 2971 3071 ...................... 3171 3271 3371 3471 3571 3671 ................ INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 ............................... P'PiGE~--/' .................. DATE OF SURVEY OCTOBER 31,. 1984 dOB NUMBER AK-BO-400 KELLY BUSHING ELEV. O0 FT. OPERATOR-SAMEC, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH SUB-SEA TOTAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE TRUE VERTICAL DEPTH VERT I CAL ~ ,~:~ ) CORRECT I ON ........................................................ 1871.00 1971.00 2071.00 2171.00 2271.00 2371.00 2471.00 2571.00 2671.00 2771-00 2871.00 2971.00 3071.00 3171.00 3271.00 3371.00 3471.00 3571.00 3671.00 1800.00 3.18 S 2.17 W 0.01 I900.00 3.54 S 1.62 W 0.02 2000.00 3.71S 0.86 W 0.02 2100.00 3.87 S 0.02 E 0.02 2200.00 4.07 S 1.01E 0.03 2300.00 4.21S 2.07 E 0.03 2400.00 4.52 S 2.86 E 0.04 2500.00 4.90 S 3.34 E 0.04 2600.00 5.16 S 3.79 E 0.04 2700.00 5.69 S 4.14 E 0.04 2800.00 6.32 S 4.43 E 0.05 2900.00 6.98 S 4.62 E 0.05 3000.00 7.82 S 4.78 E 0.05 3100.00 8.64 S 4.88 E 0.06 3200.00 9.35 S 4.83 E 0.06 3300.00 9.98 S 4.62 E 0.06 3400.00 10.49 S 4.36 E 0.06 3500.00 10.81S 4.01E 0.06 3600.00 10.95 S 3.67 E 0.06 O. O0 0" O0 O. O0 O. O0 0.01 0.01 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. OO O. O0 O. OO O. O0 O. O0 ARCO ALASKA, .......... 15,8· PRUDHOE BAY ALASKA MEASURED 'DEPTH 3771 .................. 3871 3971 4071 ...... 4171 4271 4371 ................ 4471 4571 4671 ......... 4?? 1 4871 4971 ................ 5071 5171 5271 ....... 5371 5471 5571 INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 ..................... P-AG'E'---~ DATE OF SURVEY OCTOBER 31, dOB NUMBER KELLY BUSHING ELEV OPERATOR-SAMEC, INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB'SEA DEPTH · TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 1984 FT. 3771.00 3700.00 10.92 S 3.40 E 0.06 3871.00 3800.00 10.65 S 3.14 E 0.07 3971.00 3900.00 10.32 S 2.61 E 0.07 4071.00 4000.00 9.99 S 2.05 E 0.07 4171.00 4100.00 9.68 S 1.34 E 0.07 4271.00 4200.00 9.32 S 0.69 E 0.08 4371.00 4300.00 8.90 S 0.13 E 0.08 4471.00 4400.00 8.49 S 0.56 W 0.09 4571.00 4500.00 8.24 S 1.44 W 0.09 4671.00 4600.00 7.82 S 2.48 W 0.09 4771.00 4700.00 7.28 S 3.70 W 0.11 4871.00 4800.00 6.65 S 4.49 W 0.11 4971.00 4900.00 5.76 S 4.82 W 0.11 5071.00 5000.00 4.83 S 5.29' W 0.12 5171.00 5100.00 3.99 S 5.80 W 0.12 5271.00 5200.00 3.05 S 6.28 W 0.12 5371.00 5300.00 2.23 S 6.85 W 0.13 5471.00 5400.00 2.07 S 7.40 W 0.13 5571.00 5500.00 1.21 S 6.95 W 0.14 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 O. O0 0.01 O. O0 O. O0 O. O0 O. O0 O. O0 0.01 O. O0 O.01 ARCO ALASKA, i5=8 PRUDHOE BAY ALASKA MEASURED DEPTH 5671 5772 5873 5976 6080 6185 6291 6510 6622 6738 6859 · 7118 7258 7411 7579 7764 7948 INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 DATE OF SURVEY OCTOBER 31, 1984 dOB NUMBER KELLY BUc, HIN~ ELEV ~ I :~ ~'::~:~';~0 0 FT. ', i~..','p,'.~., ,'ii+:,',::",'~)~9~?~,. ,~,: OPERATOR'SAMEC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 5671.00 5600.00 2.73 N 2.86 W 0.32 5771.00 5700.00 11.64 N 5.28 E 1.07 5871.00 5800.00 26.12 N 17.24 E 2.83 5971.00 5900.00 45.49 N 32.45 E 5.84 6071.00 6000.00 69.39 N 48.66 E 9.93 6171.00 6100.00 .96.51 N 64.15 E 14.71 6271.00 6200.00 127.37 N 81.49 E 20.81 6371.00 6300.00 162.38 N 102.14 E 28.77 6471.00 6400.00 201.85 N 12~.58 E 39.03 6571.00 6500.00 245.87 N 154.38 E 51.79 6671.00 6600.00 295.62 N 186.17 E 67.94 6771.00 6700.00 351.68 N 222.83 E 88.32 6871.00 6800.00 416.14 N 265.12 E 114.61 6971.00 6900.00 488.86 N 313.55 E 147.44 7071.00 7000.00 570.60 N 368.80 E 187.94 7171.00 7100.00 664.76 N 434.10 E 240.07 7271.00 7200.00 775.36 N 513.23 E 308.93 7371.00 7300.00 900.23 N 604.34 E 393.03 7471.00 7400.00 1025.42 N 695.32 E 477.29 0.18 0,'75 1.77 3.00 4.10 4.77 6.11 7.95 10.26 12.77 16.15 20.38 26.29 32.83 40.50 52.13 68.86 84.10 84.26 ARCO ALASKA, 'I5-8 PRUDHOE BAY ALASKA MEASURED .... DEPTH INC. SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION BATE NOVEMBER 2, 1984 DATE OF SURVEY OCTOBER 31, dOB NUMBER Al KELLY BUSHING ELEV OPERATOR-SAMEC' INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 1984 FT. VERTICAL CORRECTION 8129 7571.00 7500.00 1146.78 N 784.56 E 558.10 ............................. 8807 7671,00 7600.00' 1265.10 N 8'72.2I E 636.09 8481 7771.00 7700,00 1379.58 N 957.23 E 710.27 8651 7871.00 7800.00 1490.00 N 1039,42 E 780.41 8817 7971.00 7900.00 1596.47 N 1118.89 E 846.70 8980 8071.00 8000.00 1699.54 N 1195.43 E 909.44 9152 8171.00 8100.00 1811.64 N 1278.31E 981.07 ................ 9340 8271.00 8200.00 1941.38 N 1372.00 E 1069-78 9544 8371.00 8300.00 2085.94 N 1473.92 E 1173.01 9789 8471.00 8400.00 2269.95 N 1600.86 E 1318.11 ........................... 10140 8571.0'0 8500.00 2560.95 N 1769.12 E 1569.16 10604 8671.00 8600.00 2967.12 N 1971.31E 1933.82 11033 8771.00 8700.00 3348.63 N 2139.83 E 2262.75 .................. 1t945 8826.71 8755.71 3630.37 N 2£59.69 E 2518.29 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN ..................... TH~ NEAREST 20 FOOT MD (FROM RADIUS OF CURVATURE) POINTS 80.81 77;9~ ...................................................................... 74.17 70.14 66.29 62.74 71.63 88.7I 103.23 145.09 -~i51.05 .......................... 364.66 328.93 ~.~5_5.54 .................. ~~ ..... ARCO ALASKA~ INC. PRUDHOE BAY ALASKA ~,PERRY ~,LIN WELL SURVEYING COMPANY ANCHORAGE ALASKA COMPUTATION DATE NOVEMBER 2, 1984 INTERPOLATED VALUES FOR SPECIAL SURVEY POINTS TRUE SUB-SEA MEASURED VERTICAL VERTICAL .... I]I~PTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 9222 8208.62 8137.62 1859.35 N 1312.95 E ............ 9298 8248.61 8177.61 1911.78 N 1350'73 E 9350 8275.83 8204.83 1947.76 N 1376.58 E 9371 8286.53 8215.53 1962.53 N 1387.00 E 9424 8313.41 8242.41 1999.85 N 1413.33 E 9700 8438.25 8367.25 2201.15 N 1554.72 E 9731 8450.30 8379.30 2224.71 N 1570.87 E ........................ 9947 8521.53 8450.53 2397.73 N 1678.59 E 10713 8695.98 8624.98 3062.66 N 2015.44 E 11170 8796.85 8725.85 3472.06 N 2191.36 E ' 11190 8800.32 8729.32 3490.19 N 2199.05 E 11345 8826.71 8755.71 3630.37 N 2259.69 E MARKER P'AII~E" "-I'-1 ......... DATE OF SURVEY OCTOBER 31, 1~84 dOB NUMBER KELLY BUSHING ELEV. OPERATOR-SAMEC~ ~0 FT. TOP SAG TOP SHUBLIK A TOP SHUBLIK B TOP SHUBLIK C SADLEROCHIT SURVEY DEPTH TOP ZONE 3 TOP ZONE 2 TOP ZONE lB BASE SADLEROCHIT PLUG BACK TD TOTAL DEPTH DRILLER ARCO ALASKA, INC. 15-8 STRATIGRAPHIC SUMMARY DERIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA MARKER MEASURED DEPTH BKB TOP SAG ...... TOP SHUBLIK A TOP SHUBLIK B TOP SHUBLIK C TOP SADLEROCHIT TOP ZONE 3 TOP ZONE 2 TOP ZONE lB BASE SADLEROCHIT PLUG BACK TD ....... TVD THICKNESS BKB SUB-SEA VERTICAL TOTAL DEPTH DRILLER 11345 9222 8208.62 8137.62 9298 8248.61 8177.61 9350 8275.83 8204.83 9371 8286.53 8215.53 9424 8313.41 8242.41 9731 8450.30 8379.30 9947 8521,53 8450.53 10713 8695.98 8624.98 11170 8796.85 8725.85 11190 8800.32 8729.32 8826.71 8755.71 WITH REF~ ~iiWELLHEAD (ORIGIN-1645FNL~i378FWL) SEC .... 1'911~'75N ............ 135'O-~"'Z3E~ .... 1947.76N 1376.58E 1962.53N 1387..00E ..............-~-.----~~'~,.~'~"~z~ ...... 2224.71N 1570.87E 2397.73N 1678.59E 3062.~6N ........... 20'I'~'~4~£ 3472.06N 2191.36E 3490.19N 2199.05E 3630.'37N ........ 22~,'~9'E~ ........ 1) FROM LINEAR EXTRAPOLATION BELOW DEEPEST STATION. 2) COMPUTER PROGRAM - SPERRY SUN THREE DIMENSIONAL RADIUS OF CURVATURE. -'BA~A'OALCULATION AND INTERPOLATION BY RADIUS OF CURVATURE COMPUTATION DATE NOVEMBER 2, 1984 DATE ~-~ SURVEY OCTOBER 31, 1984 JOB NUMBER AK-BO-40085 KELLY'-BUSHING ELEV. = 71.00 ~'. T~UE NOFITH SCALE :- ! INCH TO i000.00 / lO00. C PRUDHOE 8R'T qRCC qLRSK,q. -8 -BO -40085 OCTCSER '.NC. i984 I -1000. O0 11~45 l-1000. O0 HOR, I ZONT~L PROJECT_TON 0.~0 200C. C0 ,.. ? ~OGO. CC 8000.00 iO000. O0~ 5CRLE ,- 1 INCH TO 2000.00~ 2000.0 PBdOHOE BRT qRCO qLqSKq. ~5-8 OCTOBER 31, · RT!CRL SECTION 15 42'/8. ).9 nLa~ ~ 11345 2000. O0 40,00. 00, 6000. VERTTCFtL PROJECTION 'NC. ~984 :~ for tlmely cCtrgllance with o~~gUlations.' · - Op~rat--~'r, Wel I Nam~ and Number Reports 'and Materials to be received by.' ~Required _Date Received. ~Remarks ,, m~ ~el, Hlstory~ Yes ,~~'~~ ' ~ Mud Log ~ '~ ' · · .. ., ___ Core ~ips ~~_ ' ' . ~ · ARCO Alaska, ~n~ Post Offic~ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date.: February 11, 1985 Reference: ARCO Pressure Reports 2-10~-~/Jtatic 5-2.t~Static /' 6-3~//Static Gradient 1-26-85 Gradient 1-24-85 Gradient 1-23'85 C amc o C amc o Camco 14-14 Static t5-9 -'--~St at ic 15-16 "~t atic . 15_20~tatic ~- ./ 17-9 .Static Gradient 1-27-85 . Camco ' · sign and return the attached copy as Pressure Fall Off 12-2-84 GO Gradient 1-25-85 Camco Gradient 1-25-85 Camco Gradient 1-25-85' Camco Gradient 1-25-85 Camco recipt of data. Received by Pam Lambert ATO 1429C T rans 02~- Chevron Exploration Services Extension Exploration ~e.~aco Marathon Mobile E & P ~{Ilips ~hoe Bay WeI1 Files ARCO Alaska, Inc. I1 · Subsidiary ol AllanticRichfieldCompany ,~-~--,, STATE OF ALASKA '--~ /'~// " ALASK,_ ..,L AND GAS CONSERVATION (~_ ./MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [~]X Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-155 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21180 4. Location of Well atsurface 1378' FWL, 1645' FNL, Sec.22, T11N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 71' RKB ADL 28306 ALK 2316 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 15-8 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool For the Month of. October ,19 84 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 0545 hrs, 09/16/84. Drld 17-1/2" hole to 2560'. Ran, cmtd, tstd 13-3/8" csg w/FS @ 2559'. Drld 12-1/4" hole to 9423' . Ran, cmtd, & tstd 9-5/8" csg w/FS 9397'. Drld 8-1/2" hole to 11,345'TD. Ran OHL. Ran, cmtd & tstd 7" lnr f/9057' - 10,878'. Drld thru cmt; ream to 11,208'. Ran CBL. Ran RTTS. Ran 5" slotted liner w/FS ~ 11,169'. Ran 4-1/2" completion. Drop ball; set pkr. Secured well & RR ~ 1800 hfs, 10/21/84. Drilling returns, crude & diesel injected into 9-5/8" x 13-3/8" annulus. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40, weld conductor set ~ 80'. 13-3/8" 72.0#/ft, L-80, BTC csg w/FS ~ 2559'. !! C !! · 9-5/8", 47.0#/ft, L-80, BTC csg w/FS ~ 9397'. 7", 29.0#/ft, L-80, BTC csg f/9057' - 10,898'. 5", 18.0#/ft, S-95 slotted f/10,882' - 11,166'. Instld w/2000# Poleset. Cmtd w/1938 sxs Perm "E" + 400 sx Perm Cmtd w/500 sx Class "G" cmt. Cmtd w/450 sx Class "G" cmt. 14. Coring resume and brief description N/A 15. Logs run and dePth where run DIL/LDT/CNL/GR f/11,200' CET/CBL/CNL/GR f/10,898' - 10,925' - 9068' 6. DST data, perforating data, shows of H2S, miscellaneous data N/A Rf C iVED 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· Alaska Oii & Gas Cons. u0ml-' SIGNED ,---' TITLE Are_= Dr! ~. ] ! ng Eng! neet DATE ,- NOTE--Report on this form is required for each calendar month, regardless ~ the status of ~F~A~n~t b~ ~e with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. ...... Submit in duplicate 99~5~ 0 MEMORANDUM Sta e of Alaska TO: THRU: FROM:- Lonnie C Smith · ~ TELEPHONE NO: Commissioner Edgar W. Sipple, J~ SUBJECT: Petroleum Inspecto Witness BOPE Test on ARCO's Prudhoe Bay DS 15-8, Sec. 22, TllN,R14E,UM, Permit No. 84-155, Parker Rig 176. l~onday, September 17, 1984: I traveled this date from Anchorage via MarkAir' to Prudhoe Bay ARCO's DS 15-8, Parker Rig 176, to witness a BOPE test. The drilling contractor was in the process of nippling up. The BOPE test commenced at 12:00 am and was concluded at 1:55 am. There was one failures. One valve on the choke manifold going to the gas buster, it will be repaired and tested to 5,000 psi. AOGCC office will be notified when repaired and tested. I filled out the AOGCC BOPE inspection report which is attached to this report. In summary, I witnessed the BOPE test on Prudhoe Bay ARCO's DS 15-8, Parker Rig 176. Attachment~ W_ednesday, September 19, 1984: ~ Ed Bierbower, Parker representative called the '~OGCC-office'~'and-~ihzormed us, the choke valve on the manifold was repaired and tested to 5,000 pounds. 02-001A(Rev. 10/79) 0&G 5184 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O P.E, Inspection Report Date ~-/~- ~ Well /~--- F Operator Well Location: Sec ~9 TII~ Drillin8 Contractor p~/¢~2~ Ri Location, General O~c Well Sign General Housekeeping ~Ri~ Reserve Pit Mud Systems Visual Audio Trip Tank Pit Gauge Flow Monitor Gas Detectors BOPE Stack ~~ar ~ L, L4, P_~reventer Pipe Rams Blind Rams Ch/o~e Line Valves H. C .,g,- Valve Kill Line Valves C~e~A Valv~ Test Pressure 3OOO .5-0o o / Test Results: Failures Representative ~Ok~ t~~;'~'t~2t~ Permit # ~1 ~" /3~ Casing Set @ ~ ~[/ ft #/~ .RepresentativeP~ /~-~5::)~::~/~, ACC~ATOR SYST~ Full Charge Pressure~ ..~/~0- psig Pressure After Closure ,/~0 psig Pump incr. clos. pres. 200 Psig ~ minSQ sec. Full Char~ze Pressure Attained: ~min~sec. N2 ~o, ~oo/ ,~$o~.. ~ O psig Controls:Master RemOte Kelly and Floor Safety Valves Upper Kelly'"~ Test Pressure Lower Kelly~'-~Test Pressure Ball Type ~ ~-"~Test Pressure ~0oo Inside BOP~"O Choke Manifold No. Valves /~ No. flanges ~ Test Pressure ~--~9(9 0 ~. Test Pressure ~)~)-0 Adjustable Chokes ~_.i 4~ Hydrauically operated choke Test Time / hrs. ~~, Repair or Replacement of failed equipment to be made within~~2- days and Inspector/ Commission office notified. Remarks: ~ ~'9 ~ //~' ~r-/~ ~ ~4 Distribution orig. - AO&GCC cc - Operator cc - Supervisor Inspector . ARCO Alaska, In Post OffiC'~','~J'dx 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 5, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT: DS 15-8 Dear Mr. Chatterton: Enclosed is a Sundry Notice for the subject well. We propose to alter the 7" liner program. Since we expect to start this work on September 12, 1984, your earliest approval will be appreciated. If you have any questions, lease call me at 263-4610. Sincerely, T. L. Fithian Area Drilling Engineer TLF/KJG/tw GRU1/L24 Enclosures RECEIVED Alaska 0il & Gas Cons. Commission Anchomge ARCO Alaska, Inc. is a Subsidiary of AtlanficRichfieldCompany STATE OF ALASKA ~-~' ALASKA OIL AND GAS CONSERVATION CL)MMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL ~3 COMPLETED WELL [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, AK 4. Location of Well 99510 7. Permit No. 84-155 8. APl Number 50- 029-21180 9. Unit or Lease Name OTHER [] ,/ Surface: 1645' FNL, 1378' FWL, Sec.22, TllN, R14E, UM TD: 1983' FSL, 723' FEL, Sec.15, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 71', Pad 41' 6. Lease Designation and Serial No. ADL 28306; ALK 2316 12. Prudhoe Bay Ilni~. 10. Well Number 15-8 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans 'J~ Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to change the casing program on DS 15-8. On the original, approved casing program, approximately 640' of 7", 32#, L-80, BTC slotted liner (.058") was to be run, uncemented, in the lower most portion of the Sadlerochit below the standard 7" liner. The new casing program would have the same 7", 29#, L-80, BTC liner (cemented) from 11,186'MD (8800'TVD) to 300' inside 9-5/8" casing, but the uncemented slotted liner would now be 5", 18#, S-95, LTC liner with .058" slots. This would be run from 11,925'MD (8928'TVD) to 100'+ inside the 7" liner (approx. 740' total length). Also, because the final hole angle will be 80°±, it is doubtful that a continuous gyro survey can be run to TD. Therefore, ARCO Alaska, Inc., proposes to run a multishot survey on drillpipe in the 8-1/2" hole from . 11,925'MD (8928~'TVD) to 9847'MD (8406'TVD). This will be tied into the gyro which will be run past 9847'MD until it stops. Estimated Start: SePtember 12, 1984 RECEIVED SEPO 51 4, AlasKa Oil & Gas Cons. Commission Anchorage 14. I hereby certify .thatjf~qe foregoing is true and correct to the best of my knowledge. Signed "~,L- . ...... Title Area Drilling Engineer The space below for Commission use Conditions of Approval, if any: i~Y.: rOll, II C. $181'19 Approved by COMMISSIONER By Order of the Commission Date Form 10-403 R,_v 7-1 an GRU1/SN38 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate August 31, 1984 Mr. T. L. Fi thian Area Drilling Engineer ARCO Alaska, !nc. P. O. Box 100360. Anchorage, Alaska 99510-036 Prudhoe Bay Unit DS 15-8 ARCO Alaska, Inc. Permit No. 84-155 Sur. Loc. t654'FNL~, I378'FWL, Sec. 22, TllN, R14E, L~4. Btn~hole Loc. 1983'FSL, 723'FEL, Sec. 15, TI!N, R14E, b~{. Dear Mr. Fithian: Enclosed is the approved application for permit to drill the above referenced well. Approval of this application for permit to drill DS 15-8 DOES NOT approve the running of 7", 32~/ft, L-80, BTC casing with 0.058" slots cut in the pipe body. Approval of your request to run an -~ncemented slotted liner in'this well is dependent upon the issuance of a conservation order exempting ARCO Alaska, Inc. from the requirements of Rule 3 of Conservation Order No. 145. A notice of this request will be published on September 2, 1984, and a possible hearing date is set for 9:00 ~ on September 14, 1984, after which an order may be issued. In the event a conservation order cannot be issued, conventional cemented 7", 29~/ft, L-80, BTC casing must be run in place of the slotted liner. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of l~ we~, cuttings and a mud log are not required. A continuous directional survey is required as'per 20 AAC 25.050(b)(5). If available, a tape conta~nzng the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage ~ystems have been classified as important for the spawning or migration of anadromous fish. Operations in the~e areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, _ . Hmo T. L. Fithian P~adhoe Bay Unit DS 15-8 August 31, 198& Alaska Administrative Code). Prior. to commencing operations ~ou~ may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 mhd the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to conmaencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Ve~ trul, ~yours, C. V. C~atterton Chai~n of Alaska Oil and Gas Conservation Co~ission BY OPJ)ER OF ~E COMMISSION be Enc ! o s ur e cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office B,.,^ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 August 21, 1984 Mr. C. V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commi s s i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' DS 15-8, Permit to Drill Dear Mr. Chatterton' Enclosed is our application for ?ermit to Drill DS 15-8 and the fee. Attachments to the applicati°n include required $100 filingsection and plan views of the propos, ed plats detailing the wellbore; a proximity plat showing the subject wellbore s position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we anticipate spudding this well on September 7, 1984, your earliest approval will be appreciated- If you have any questions, please call me at 263-4610. Sincerely, . T. L. Fithian Area Drilling Engineer TLF/JG/tW GRUB/L109 Enclosures ECEIVED AUG 2 7 ].984, Aiaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, inc. is a Subsidiary of AtlanticRichfieldC°mpany STATE OF ALASKA ~'~. ALASKA O,L AND GAS CONSERVATION CO,,,MISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL D~]X DEVELOPMENT GAS [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 1645' FNL, 1378' FWL, Sec.22, T11N, R14E, UH At top of proposed producing interval 1320' FSL, 1320' FEL, Sec.15, T11N, R14E, UH (~ Target) At total depth 1983' FSL, 723' FEL, Sec. 15, T11N, R14E, UN 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 71', PAD 41' ADL 28306 ALK 2316 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 7-1/2 mi. NW of Deadhorse miles 723' FEL ~ TD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 11,925'ND, 8928'TVD feet 2560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT5563 feet. MAXIMUM HOLE ANGLE80 oI (see 20 AAC 25.035 (c) (2) SERVICE [] STRATIGRAPH I_~ SINGLE ZONE :~, ~ MULTIPLE ZONE (-]% ~.. 9. Unit or lease name Prudhoe Bay Unit 10. Well number 15-8 11. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool Amount $500,000 15. Distance to nearest drilling or completed 15-7 welr120' (~ surface feet 18. Approximate spud date 09/07/84 3132 psig@ - Surface 3975 psig@~928 ft. TD (TVD) SIZE Hole Casing 130" 20" i17-1/2" 13-3/8" j12-1/4" 9-5/8" 12-1/4" 9-5/8" 8-1/2" 7" 8--i/2;; 7ii Weight 91.5# 72. O# 47. O# 47. O# Proposed Casing, Liner and Cementing Program CASING AND LINER Grade Coupling H-40 I Weld L-80 I BTC L-80 I BTC S00-95 I BTC L-80 I BTC L-80 BTC Length SETTING.DEPTH MD TOP TVD 80' 30' 2470' 30' 8178' 29' 1640' 8207' I 30' I 30' MD BOTTOM TVD 110'I 110' I 2500'I 2500' ~ 29' 8207'I 7661' 17661' 9847'1 8406' I 18270' 11925'I 8928' I c Pack 9-5/8" x 13-3/8" QUANTITY OF CEMENT (includestagedata) 2000# Poleset 2300sx CS 111&4OOsxCS I 500 sx Class G 29.0# 2378' 9547' 400 sx Class G 32.0# See Attachment/Arcti 300 sx CS I ARCO Alaska, Inc., proposes to directionally drill this well to 11925'MD (8928' TVD) to produce from the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8", 5000#, RSRRA BOP stack will be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 4-1/2", 12.6#, L-80 tubing and packer will be run. Provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval: A surface diverter will be installed and operationally tested prior to spud. DS 15-8 will be 120' from DS 15-7 at the surface. There are no other wellbores closer than 200' anywhere along the proposed well course. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any (see attached sheet) -23.1herebycertifythatth~oregoingistrueandcorrecttothebestofmyknowledge~. ~~ SIGNED ~.L~ ~ TITLE Area Drilling Engineer DATE The space below for Commission use CONDITIONS OF APPROVAL Samples required Mud log required []YES ~flXIO [-]YES [~NO Permit number ~ ,,, ~ Approval date 'Form 10401 GRU8/PD46 Directional Survey required APl number ~:~¥ Es []NO SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE August 31. 1984 by order of the Commission Submit in triplicate Permit to Drill 15-8 interruption in the disposal process (i.e., rig move or shutdown of disposal for an extended period of time.)The lower most (Zone 1) section of the Sadleroehit interval will be produced through an uncemented, slotted liner. The slotted liner will be 7", 32#/ft, L-80, BTC casing with 0.058" slots cut in the pipe body and will be run only across the Zone 1 portion, approximately the lower_6~4Q'~ of the liner string. The remainder of the liner will be conventional 7", 29#/ft, L-80, BTC casing from the top of the slotted to the liner hanger. An external casing packer (ECP) will be run between the conventional and slotted liner. Class "G" cement will be circulated through a stage collar above the ECP to the top of the liner. Realizing that running an uncemented portion of the production liner across the Sadlerochit violates existing Field Rules, ARCO Alaska, Inc., requests an exception to Rule 3 (f) of Conservation Order No. 145 and the Prudhoe Bay Field Rules. The use of an uneemented slotted liner completion technique should allow increased production in Prudhoe Bay upstructure wells. aOe ~rni$~io~ ,.,', ;;~ ,.~;~, ~ ii;~' ' ,~,~' ~'~,~ .... ] - ~ ' ' ..t,.~hf~h ~1. :~h,t,hl~!f~,t~l~hllti,t~,Iilht~,,[l~,![t~,i[!l!t~lltti[l,! Hilt ........ ~l!ll!'~l ~'i 11t~~ !t~ ~* t' ! I I ~tlttlI~IttL~ttt'tItftI~f~IHTIt-~tt!t~It~t: ~t],!L~,I,~!tt!t~t]fttlHtfl~fHtltt~t~Ilil]~t!t]tlttttt.!-liit ltl[ttl]ttft~tttH t[~]t]tHt~i~I~t~H~tf~I~HtI~thf~flH~FHt~~h ~[ t ~i ',~"~ , , ........................................................ ~,.~. ' I1~' , t i t I t[LLLttt I I I ! t I I i t ~ tf t ~i~ ~ I~ ~u ~1t ~t~$Hbi ! ff~~lf~Sf~t-f-HiHtt tJ~t t t ft, tt~~H-~-~t~t J~ t ~ ~ ~, ,, tjJr ,,i ~t,ttt !.tt~!,t.lf,l,!.:l,fl:ttHtt,tt,t,...ltffff[Fl[[Ffftr~rf - - , ........... ,.. ,,..,.....~.~ ' J~ J[Jm['J J~H HJ~~~J]~HJ~~~JJ: '"" ....... ,, ,, t ~HtHt~t,tJlItttit[H[ttH~tttHt ...... ~f ........ -~..~,.,,u-~ fit, .... =~ !! ttttf!1ilt! t!t i ]1', I III]Itt1!t] ftJll I1!! i tl Itt tli I! [It [ttli t ~ I I I t t ttf tttlt Htltflll 1 tlttlt Ill t titHtt'tl t: · . :. AlaSk~ 0¢ 8, Gas Cons. .. ' AnCb. orage . RNNULRR -PRFJV~NTOR PIPE RRMS BLIND RRM$ DRILLING SPOOL P['PE RRMS 13-$/8" BOP STACK DIAGRAM Accumulator Capacity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1S00 psi downstream of the regulator. 3. Observe time, then close all units simultaneously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-$/8" BOP Stack Test 1. Fill BOP stack and .manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. ,Mark running joint with predetermined plug sea.ting depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and upstream valves. 4. Functionally test chokes. 6. -In each of the following tests, first hold a 2S0 psi low pressure test for a minimum of 3 minutes, then test at the high pressure. 6. Increase pressure to 3000 psi and hold for a minimum of 3 minutes. Bleed pressure to zero. 7. Open armmtlar preventer and close top set of pipe rams. Increase pressure to $000 psi and hold for at least 3 minutes. Bleed pressure to zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to $000 psi and hold for at least 3 minutes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to $000 psi below the bottom set of pipe rams and hold for at least 3 min- utes. Test reamining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure de~nstream. Bleed pressure to zero. Open bottom set o£ pipe ra~ll~. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minutes. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are f~ll of non- freezing liquid and all valves are set in drilling pos it ion. Test standpipe valves to $000 psi. Test Kelly cocks and inside BOP to SO00 psi with Koomey pump. Check operation of Degasser. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor. Perform complete BOPE test once a week and func- tionally operate BOPE daily. 10, 11. 12. 15. 14. 1S. 16. 17. 18. RECEIVED AUG 2 Alaska Oil & Gas Cons. Co~missJon Anchora,oe Revised 3/Z1/84 SURFACE HOLE D TVERTER ARCO ALASKA SYSTEM INC. SCHEMATIC _.~ I0" HYD. OPR. BALL VALVI~ .,,~..~V~iELL BORE (SEE DETAIL) ,/" .,~..-..'--I O" HYD. OPR. BALL VALVE /" /"/"' I ALL 90° TURNS ARE "TEE" ~ I CUSHION .=..___ ~LL (~ BORE I RESERVE PIT AREA NOTE' FLOWL INE DR ILL ING RISER /,F 20" 2000 P S I WP ANNULAR PREVENTOR Valves on diverter lines open automati- cally when the annular preventer is closed. 20" CONDUCTOR PIPE / I0" HYDRAULIC OPERATED BALL VALVES "DETAIL" 2026O 10203 ~' ' 'ZI %'L- '. ' .' ' x=677267.35¢ \ LAT=70o 17: .47.457'_.~ ' ' ' -_' L0tl'B=I~8° 33' 52.070''~ 7" ....... Y=59599852 54~ -.~:-. ~- -X=677294.455 ". ''LAT=70o 17' 46.295" ' LONG=i48° 33' 51.~61", , ~ .... 'LAT=70° 17' ~5.1~" ' . LONB=I~8° 33' 50.6~,0'~ t~ CELLAR BOX ELEV=29.l, 9. ~' LAT=70° 17' 43.9~7' ~ LONG=I48° 33' 49.952'" ' ~/ ~ CELLAR BO.X ELEV=~g 67 14 Y~5')59167. 656 ~ ~ -' ' X~677~,83.202 . · ,;// ~~~, ~ . LAT~70t' 17' 38.212 , ,0 ~x~-t i.~ · . ~ , ,, ~2~;..-.--7-..~e~,~. LONG-14,,o ~3 4~-.4Z3 ~ " 'CELLAR-l~OX ELEV~2~ 68 ~-; ll- Y=59~18 333 X=677402.086 15 ' Y'"' '" ~ t'r°O~O ~ '~c8~' ~' ~'~'"~"~-'"""~"Z" ~ ~' LONG=14S° 33' 48 ¢46 '- X, 677510.010, , ,, ' '' LAT, 7,~t 17 37.05Z CELLAR BOX ELEV=29.14 tO~6~ 14~~' 33' 45.7Z3" , LAT=7O° 17' ~0.525" ' I HEREBY GERTI~ THAT I AM L0~G=148o 33' ~7.842" P~OPERLY RE~I~TE~E~ CELLAR BOX ELE~=29.5~ LIGENSED TO PRAOTIGE LAND SU~VEY~N~ ~N ~HE STA~E 13 Y=575928~.51~ ALA~KA.~Ar.~D THAT ~HI~ X=677~6. ~07 ~P~E~ENT~ ~N ~-B~ILT ~Am.70~ ]7' ~.~'~" ~,OE B? ME. ,~ T~,T ,LL LON~=~8~ ~' ~7. ]~7" D~r~N~ION~ AN~ OTHE~ ~A[L~ CELLAR ~OX ttEV=29.7~- ARE OORREOT. AS OF: ~] i I I i i ~li~'nticRichfi~ldOomp~nY ~ DATE: DRAWIN~ NORT~ A~ERICAN PRODUCIN~ DIVISION ~/~/~l ~IOSA A~ ~~ n~Tn~T-- PRllDNOE BAY · CHECK LIST FOR NEW WELL PERMITS IT EM APPROVE DATE YES NO REMARKS (1) Fee q~'~, ~'"'~-~{? 1. Is the permit fee attached .......................................... (2) Loc . c~"¥'g~'~? 2. Is well to be. located in a defined pool ........................... ~2 thru 8) 3. Is well located proper distance from property line ....... ' 4. Is well located proper distance from other wells ......... 5. Is sufficient undedicated acreage available in this pool i i 6. Is well to be deviated and is well bore plat included .... 7. Is operator the only affected party ..................... __ ~2~ ~/2¥~ 8. Can permit be approved before ten-day wait ............... .......... ~'!3'~ Admin~ .... -,9-.~" Do es operator have a bond in force ........ ..... ~~"-~?-'7~'.~ 5 10. Is a conservation order needed ............... . ' . ~ - 7.~____ ~/'~.~l,W ~,z 11. Is administrative approval ~eeded ........ (4) Cas~ ~'~ f/f~/f~ 12. Is conductor string provided ........................................ '(12 thru20)~ ' 13. Is enough cement used to circulate on conductor and surface ......... 14. Will cement tie in surface and intermediate or production strings 15. Will cement cover all known pr°ductive horizons .................. 16. Will surface casing protect fresh water zones .... ' ................ 17. Will all casing give adequate Safety in collapSe, tension and burst. '18. Is this well to be kicked off from an existing wellbore ......... 19. Is .old wellbore abandonment procedure included on 10-403 ............ /~, 20. Is adequate well bore separation proposed ... ....................... (5) BOPE ~ M/~/~ 21. Is a diverter system required~. ............... , ................. '(21 thru/ 2~) 22. Are,necessary diagrams of diverter and BOP equipment attac~ed 23. Does BOPE have sufficient pressure rating - Test to ~z~'~5 pSig .. 24. Does the choke manifold comply w/API RP-53 (Feb.78)., ................ __ ,A/Z~I'"'_x'zJ~',~/7'7'~'/D, (6) Add: 25 Additional requirements . .., ....... , · e e i e e i i e ~, · e, e · · · · ! · e .I e · I el Additional Remarks: .JP~-AI /O--~ 7~71f~ ~ /~~/~ /~'-? Geolog.y: En8inge r in§: HWK z-~- LCS ~a,~'BEW / JAL ~ ,,// ,'"' / rev: 12/08/83 6. CKLT 'INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effod has been made to chronologically organize this category of information. , .,---- S C.H LU~,q B E R C.~,E R ...... --,- LIS TAPE VEI~IFICR'¥'ZON LISTINg VP OiO.H02 VER!FICAI'iON LISTING R.~GE 1 ~:~ REEL H.=ADER "4-'~:-' ERViCE NAME :ED'~'F ATE :8'7/05/ 5 RIGIN : EEL NAME :722T5 ONTiNUAT!ON # :OI REVIOUS REEL : OMMENTS :LIS TAPE,ARCO PRUOHGE ¢ TAPE HEADER ~ ERVICE NAME :EDIT ATE :87/05/ 5 RiGIN :FS1A APE NAME : ONTiNUA'I"iON # :01 REVIOUS TAPE : OMMENTS :LIS TAPE,ARCG P IR U I] fi O E :~:~ FILE HEADER ......-,--,, ILE NAME :EDIT ERVICE NAME : ERSION # : ,ATE : ,AXINUM LENGTH iLE TYPE : REViOUS FILE :~:: INFORMATION .001 : 1024 : RECORDS ....... -,--,. IN EM C ONT EN TS :N : ARCO ALASKA ~N : D.S. 15-8 :N : PRUDHOE 6AY ANG: 14E 'OWN: lin ,ECT: 22 ,GUN: NORTH SLCPE ,TAT: ALASKA :TRY: USA iNEM CONTENTS I NC. 'RES:,-: :;:: CO~IMENTS,, -,.-,. 8AY D.S. 15-8,APt 50-029-21180 50-029-21180 UNIT I'YPE 000 000 000 000 000 000 000 000 000 CATE OOO OOO 000 000 000 000 OOO 000 000 SIZE 016 OO9 011 OO3 OO3 0O2 011 0O6 003 COOE 065 065 065 065 065 065 065 085 085 UNIT TYPE CATE SIZE COBE 001 COO 000 065 ~P OlO.rtO2 vEr~IFICiI, T~;":Z~N LiSIiNG PAG5 2 ,',' ',' ',' ',' ',' ',' ',. ",' '~' ',' -,- '~' ',' '",' ',' ',' '~' ',- ',' "J' ',' .... ~' ',' ~,~...r..*..,~ .,~ ..~..,'...~., ;:~ .,. .,..6..,...~. ,,.,..*..~ .~..~..~, .~ .*..~..,, .~., .~. S C H L U M b ~ R G ":' R ,~LASKA CONPU'TING CENTER ;:: ~':: ,'.::.,. ........................................ .,- -, ........ , ..... ,- -,- -, .......... X: ;',: X: ~;~ ....... -,- -,. ~- ".,. .............. .,- .,- -, ..... "' ,- ~',-' ~',~ '-:: >::-,. ....................... -,- -,- -,'. -,. -,. -,- -,- "' >:: -,- .... -,- ' ..... -,' -,' ........................................ ',' -',- ',' ',- ',' ',' ',' '," '~' ',' '~ :',: $' >',: .................. ;~ '~ .......... "' '"' ''~' '~' '" ................. ' ...... 3APANY = ARC!] ALASKA ZN,C ELL : D.S, 1,5'-8 ZELD = PRUOHGE ',3AY 3UNTY = NORTH SLOPE ~C',ROUGH lATE = ALASK~ 3B NUMBER AT AKCC: 72275 LJN #2, DATE LOGGED: .2'~',-~AR-$7 DP: RICK KRUWELL ASING = 13.375" 1'9 2539' ASING = 9.625" TO 9397' ASING = 7.000" 'TC 10898' UBING = 4.500" TC 9127' YPE FLUID = GAS/OIL IT SIZE = 12.25" TO 9397' IT SIZ~ = 8.5" TO 11110' OTE: 1.)FILE ~DIT.O0t CgN'TAiNS TDTM DATA OF ~,AS2 GAMMA RAY PASS (BAS)~ VP OlO.HO2 VERIFICATION LISTING P~iGE 3 PASS 1 (PS1), ~ASS 2 (PS2)~ PASS 3 (PS3)~ ~tND HOOGES LEHMANN LATERALL'¥ AVERAGED SIGM~FSIG,GAMMA RAY,IRAT (LAV). 2.)FILE EOiT.O02 CONT.AINS CASING COLLAR LOCAi'G'R OF BASE PASS~. PASS PASS 2, PASS 3 -,-"' SCHLUM~:$RGE]R.. EGGS INCLUD~'O~- ¢~'I'TH THIS M'~GN~:IIC,,. TAPE'. ~:-' THERMAL DECAY TtM:~ (T'HR~E PASS TO'TM) -,- Ag~A, RAY LOG CGR), ,IP OiO.HOZ VERI,:gZCAI"IC}'N LTSTZNG 'PAGE $ DATA FORMAT RECORD ~:<%' NTRY BLOCKS TYPE 2 4. 9 16 0 A'TUM SPE NEM SERV ID EPT iGM PSi R AT PS1 S IG PSi R PS1 ACK PS1 BAC PSI TOT PS1 TOT PS1 ENS PSI AU PS1 IGM PS2 RAT PS2 SIG PS2 R PSI ACK PS2 BAC PS2 TOT PSI TOT PS2 ENS PSi AU PS2 IGH PS3 RAT PS3 SiC- PS3 R PS3 ACK PS3 BAC PS3 TOT PS3 TDT PS3 ENS PS3 AU PS3 R BAS ENS BAS IGM LAV SIG LAV RAT LAV R LAV CIFiCATION ICE SERVICE ORDER ~ SIZE ! i 4 4 1 1 E~LOCKS UNIT AP1 AP LCG TYP Fl' O0 O0 CU O0 ,~0 O0 ~2 CU O0 40 G~PI O0 3~ CPS O0 39 CPS O0 39 CPS O0 3'9 CPS O0 39 LB O0 63 US O0 41 CU O0 40 O0 42 CU O0 40 GAPI O0 31 CPS O0 39 CPS O0 39 CPS O0 39 CPS O0 39 LB O0 63 US O0 41 CU CO 40 O0 42 CU O0 40 GAPI O0 31 CPS O0 39 CPS O0 3'~ CPS O0 39 CPS O0 39 L8 O0 63 dS O0 41 G~P! O0 31 L~ O0 63 CU O0 40 CU O0 40 O0 42 GAFf O0 31 I AP1 '2 CLASS 0 O0 0 01 0 Oi 0 01 0 01 0 1'7 1 17 0 O0 i O0 .5 21 C 01 0 Oi 0 01 0 01 0 01 0 17 1 17 0 O0 i O0 5 21 0 0 01 0 Oi 0 01 0 0 1 O0 5 21 0 01 0 01 5 21 0 O1 0 O! 0 0 O1 R E P R CODE 66 73 65 66 66 :NTRY 0 1 6O 1 0 AP1 FiLE SIZ~ SPt MgD NO. 0 0 4 I 0 0 4 ! 0 0 4 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4, 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 t o o 4 1 0 0 4 i 0 0 ~ 1 0 0 4 i 0 0 4 1 0 0 4 ! 0 0 4 1 o o 4 1 0 0 4 1 O 0 4 1 0 0 a 1 0 0 4 1 0 0 4 1 0 0 4 1 0 0 4 t 0 O 4 i 0 0 ~ i 0 0 4 1 0 O 4 i REPR CODE 68 68 68 68 68 68 66 65 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 PROCESS (OCTAL) 00000000000000 00000000000000 00000000000000 00000000000000 O0000000000000 O000000OO00000 00000000000000 00000000000000 OOO00000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 O00CO000000000 O0000000000CO0 00000000000000 00000000000000 00000000000000 O0000000000CO0 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 O000000CO00000 00000000000000 O000000OO00000 VP 010.H02 VERIFICATIOH LISTING 'PAGE 5 =',~ DATA EPT 11015,0000 SiGN R -999,2500 BACK TDT -999,2500 TENS RAT -999. 2500 FSiG BAg -999.2500 NTCT AU -999.2.500 $tGM R -999.2500 BACK TOT -999.2500 TENS ENS -999.2500 SiGN R -999.2500 EPT 11000.0000 SiGN R -999.2500 BACK TDT -999.2500 TENS RAT -465.7500 FSiG BAC 16.6719 NTOT AU 1749.0000 SIGN R -999.2500 BACK TDT 451.0000 TENS ENS -5800.0000 SIGN R -999.2500 EPT 10900.0000 SIGN R -999.2500 BACK 'rOT -999,2500 'TENS RAT 2.5625 FSiG ~AC 21.7031 NTDT AU 242.8750 S iG~'l R 24.7'798 ~ACK TDT 164.2500 T~NS ENS -5772.0000 SIGM R 24.77S8 EPT 10800,0000 SIGN R 13,0547 BACK TOT 207,7500 TENS RAT 3.1562 FSIG BAC 37.8125 NTDT AU 173.7500 SiGM R 16.4824 B~CK TDT 175.2500 TENS ENS -5'776.0000 SIGN R 16.4824 EPT 10700.0000 SiGN R 13.7656 BACK TDT 211.3750 TENS RAT 2.9062 FSIG 6AC 36.1250 N'FDT AU 2i9.7~1 S!G~q -999.2500 -999.2500 -999.2500 -999.2500 -99~.2500 -999.2500 -99~.2500 -999.2500 ·-999.2500 -999.2500 -999.2500 -19.0156 -239.3750 -999.2500 10000.0000 -582~.0000 -999.2500 -999.2500 -99'9.2500 -999.2500 i6.4063 163.8750 19.0156 94.7500 -5820.0000 19.0156 25.0313 38.0000 -3816.0000 22.7344 263.5000 26.0000 109.3125 -5752.0000 26.0000 21.~688 57.0938 -5832.0000 18.5940 236.9980 20.9779 TRAT FBAC TAU GR FTDT TRAT FBAC TAU FS IG TR~.T FBAC TAU F 'TOT TRAT T A U 'FSIG I'RAT TAU GR FIDT IRAT FBAC TAU FSIG TRAT FBAC TAU GR FTDT TRAT FBAC TAU FSIG TRAT FBAC TAU GR FTDT T R A T -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 42.5313 -239.3'750 -999.2500 32.5313 1767'.0000 -999.2500 -999,2500 -999.2500 -999.2500 20.3,418 154.8750 2.6123 39.7188 235.5000 16.5469 3.2930 25.8750 181.6250 16.98~4 206.0000 3.1899 53.6875 170.8750 22.8086 2.~730 31.4219 211.8'750 16.7080 208.6719 2.9019 FSIG N~TDT SiGN BACK TENS FSIG NTDT GR TRAT ESIG NTDT SIGN BACK TENS FSIG NTOT GR TRAT FSIG NTOT SiGM BACK TENS FSIG NTDT TRAT FSIG NTD'T SIGM BACK TENS FSIG NTDT GR TRAT FSIG NTOT SiGH BACK TENS FSIG -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999,2500 -999.2500 -999.2500 -999.2300 -999.2500 2.5996 10000.0000 -5876.0000 -999.2500 451.0000 21.0781 -99'9.2500 -999.2500 -999.2500 18.7188 53.2500 -5832.0000 16.5469 169.2500 26.1406 2.6123 23.3594 257.2500 26,1719 72,3125 -5640,0000 22.8086 241,6250 14.9766 3.1899 18.3438 269.0000 20.6929 73.7500 -5872.0000 18.5704 VP OlO.MO2 VERIFICATION LISTING ?',AGE 6 R 15.9'724 BACK TDT 200,8750 TENS ENS -5800,0000 SiGH R 15.9724 EPT 10600,0000 SiGM' R 13,1855 BACK lDT 174,2500 TENS RAT 2.~7466 FSiG ~AC 29,6597 NTOT AU 236.1172 SIGH R 1'7.6523 BACK TDT 203. 8750 TfNS ~NS -5748.0000 SIGH R 17.6523 EPT 10500,0000 SIGH R 28,8281 8ACK TDT 174.5000 TENS RAT 3.2773 FSIG 8AC 50.1250 NTDT AU 174,1250 StGM R 30,8242 BACK TDI 149.2969 TENS ENS -5732.0000 SIGH R 30,8242 EPT 10400.0000 SIGH R 14.3828 BACK 'TDT 264.5000 TENS RAT 2.0176 FSiG B~C 38. 2187 NTDT AU 232.5000 SiGH R 16.335~ BACK TDT 229.1250 lENS ~NS -5736.0000 SiGH R 16,3398 EPT 10300,0000 SiGH R 14.8477 BACK I'DT 257.0000 TENS RAT 1,9384 FSiG 8AC 42.7695 NTDT AU 244.7500 S!6M R 16.6787 BACK IDI 214.8750 IENS ENS -5792.0000 SiGN R 16.6787 'EPT 10200.0000 S ! Gi~"i R 11.4219 BACK :TOT 226.2500 TENS RAT 1. 9139 FSIG ~C 50.7383 NTDT 113.3125 FBAC -5800.0000 TAU 20.9779 FSiG 1~,5156 TRAT 32,4063 P~AC -5780,0000 TAU 16,0659 GR 178,9375 PTDI 19.5097 iRAT 107.2520 FBAC -5800.0000 IAU 19.5097 FStG 24.0000 TRAT 73,6875 ~BAC -$772.0000 'IAU 21.7031 GR 240,0000 FTD'I 24,9194 TRAT 116.4598 ~BAC -5788,7148 'TAU 24,9194 FSIG 20,2344 TRAT 77.1875 F:BAC -5820,0000 TAU 17.2344 GR 218,7500 FTDl 19.9756 7RAT 118.4375 ~BAC -5727,9844 'IAU 19,9756 F$IG 18,1094 I'RAT 84.1875 FbAC -5840,0000 TAU 14.9232 GR 212.0625 FID'7 17,9895 TRAI 123.1875 ~8AC -3732,0000 I'AU 17,9895 ~SiG 16.6563 IRAT 94.8750 PBAC -3840.0000 TAU 14.0383 GR 165.8591 ~TDT 60,1562 217,8750 18,5704 2.7168 22.5000 233.1250 18.4844 153.7656 2-7161 41.09~8 230,2480 16.7137 2.98813 37.5938 189.5000 35.21S7 176.8750 3.2154 59,1396 183,4683 .21,1309 2.0723 32.7813 224.7500 16.9922 259.0000 2.0264 46.1152 226.8125 16.7'986 1,9561 40.2813 251,0000 17.2891 241,0000 1,9228 49,5313 265,0000 14,9440 45,2187 20.7'734 227,3125 ¢~TD'T GR TRAT FS!G NID'T SIGH BACK TENS FSIG NTDT GR TRAT FSIG NTDT SIGH BACK T5NS FSiG N TOT GR TRAT FS IG NTDT S IGM BACK 'T E N S PSIG NTDT GR TRAT FS It3 NTDT S IGM BACK TENS FSiG N TOT GR TRAT FSIG NTDT S IGM BACK TENS 249,0000 13.4453 2.9019 17,093B 215.3750 19,262'7 80.1914 -5862,2969 16.7137 224.1719 17.3750 2.7161 21.3281 213.2500 26.1094 97.5000 -5808.0000 21.1309 210.9297 24.7813 3.2154 16.8125 23'7.1250 19.5625 95.8750 -5808.0000 16,7986 233,2500 14.1328 2.0264 15.4453 200.3750 18.5830 100.6875 -5821.2656 14.9440 179.6250 13.6797 1.9228 13.8437 187.3750 16.7327 109.1875 -5815.9844 VP OlO.HO2 YERIF:ICATION LISTING PAGE 7 AU 271.5469 SIGM R 17.7961 BACK TDT 235.7266 TENS ENS -5812.0000 SiGH R 17,9961 EP'T 10187.0000 SiGH R -999. 2500 BACK TOT -999.2500 TENS RAT -999,2500 FSiG '5 A C -999. ,2500 N 'T 0 'TI" AU -999.2500 SiGH R -999. 2500 8ACK TDT -999,2500 TENS E NS -999.2500 S I GM R -99'9.2500 16,7413 TRAT 122,117£ FBAC -5811.9844 TAU 16, '7413 FS IG '-9':)9.2500 TRAT -9'39. 2500 FBAC -9'99.2500 TAU -999,2500 GR -999. 2500 FTD'T -999.2500 TRAT -999,2500 F~AC -999,2500 '['AU -999.2500 FSIG 1,9089 57,4766 269.9922 13.72.44 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 FS iG NTDT GR 'TRAT FSIG NIDI SIG~q BACK TENS FSIG NTDT GR T R~T 13,7244 202.3789 13.4%66 1.9089 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -99~,2~00 -999,2500 -999,2500 -999,2500 -,. FILE TRAILER ...... .,..,. ILE NAME ::EDIT .001 ERVICE NAME ERSION # : ATE : AXIMUM LENGTH : 1024 ILE TYPE : EXT FILE NAME : FILE HEADER iLE NAME :EDIT ERVICE NAME : ERSION # : ~TE : AXIMUM LENGTH ILE TYPE : REVIOUS FiLE : .002 1024 ;:-' D~TA FDRMAT NTRY BLOCKS RECCRD ...... TYPE SiZE REPk CODE 2 1 66 4 1 66 8 4 73 9 4 65 16 I 66 0 1 66 ~ATUM SPECiFICA'FIGN iNEM SFRVICE SE~,ViCE iD [] R L)ER ~ ',CL 8LE'CK S LIN Il' FI AP1 AP1 API APl FILE L,~G 'T'YPE CLASS F!OO NS. O~ 000 OO 0 0 O0 150 O1 0 0 E ;'~ T R Y 0 i 10 .lin 1 0 SiZE SPL 4 1 4 I n~ CDDE 6~ PROCESS (OCTAL) 00000000000000 O0000000000OO0 VP OlO.H02 VERiFiCATiON LiSTiNG PAGE 8 CL PS1 O0 CL PS2 CL PS3 O0 150 O! 0 0 150 O1 0 150 01 0 0 g DATA ~ EPT 11010.4150 CCL CL -999.2500 EPT 11000.,2500 CCL CL -99'9.2500 EPT 10900.2500 CCL CL 0.0000 EPT 10500.2500 CCL CL 0.0000 EPT 10700.2500 CCL CL 0.0000 EPT 10600.2500 CCL CL 0.0000 EPT 10500.2500 CCL CL 0.0000 EP'T 10400.2500 CCL CL 0.0000 EPT 10300.2500 CCL CL 0.0000 EPT 10200.2500 CCL CL 0.0000 iEPT 10187,5000 CCL .CL 0.0000 0.0000 CCL 0.0000 C, CL 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL. 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL -999.2500 CCL :~: FILE TRAILER-,,-,- ILE NAME :EDIT .002 ,ERViCE NdME 'ERSI[~N # : ~,~T E : I&XIMUM LENGTH : 1024 :iLE TYPE : !EXT FILE NAMF : TAPE TRAILER I 68 0000,3000000000 1 68 O0000000OO000O I 6B 00000000000000 -999.2500 CC'L -999.2500 CCL -999.2,500 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL 0.0000 CCL -999.2500 CCL -999.2500 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 -999.2500 VP OlO.H02 VERIFICATIEtN LISTING PAGE' 9 ERVICE NAME :EDIT ATE :87/05/ 5 RIGIN :PSiA APE NAME ONTINUATZON ~ :01 iEXT TAPE NAME : ,OMMENTS :LIS TAPE~ARCi] PRUOHOE :;:': REEL TRAZLER ;',:'~',-' ,ERVICE NAME :EDIT ~AT5:87/05/ 5 ~RZGZN : EEL NAME :72275 ,DNTINUA'TZDN ~ :01 ;EXT REEL NAME : ,OMMENTS :LTS TAPE,ARCC 5AY O.S. 15-8~API 50-029-21180 50-029-21,180 ¥'ERIFICATION I,~IS'IlNG ~VP 010,H02 VERIFICATION LISTING PAGE 1 :* REEI~ NEADER ;ERVICF NAME :EDIT )AT5 .84/12/ 3 )RIGIN ~ IEEL NAME : '.ONTINUATION a 'REVIOUS REEL ~OMM~NTS : ~ERVICF,, ME ~ EDIT )AT.~i :84/12 3 )RIGIN ~696~& ,~APEI~AME ~ONT~, UATISN ~ :01 ,)REV~OI'ISM ....TAPE : ,0 ~ NTS : ,00I ;E~VICE ~a~IE TER$IOM # )ATE : ~AXiMU~ LENGTH : 1024 ~, INFORMATION CONTENTS 2N : ATt, ANTIC RICHFIELD CO, ~N : DRILL SITE 15-8 ~N : PRIIDHOE BAY ~ANG: tOWN: lin SECT: 22 ~OUN: N,SbOPE STAT: ALASKA CT~Y: USA ** COMPENTS ** UNIT TYPE CATE SIZE CODE 000 000 030 065 000 000 030 Ob5 000 000 016 065 000 000 003 065 000 000 003 065 000 000 002 065 000 000 010 065 000 000 010 065 000 000 010 065 [.,V`P OlO.H02 VERI. ICATiON LISTING ,PAGE 2 * ~SC[~bUM ERGER * ****************************************************************************** ~4ELL = 0RibL SITE 15~8 FIELD = PRUDM'OE BAY ~OtNTY = NORTH SLOPE BOROUGH ~TATE = AbASKA ,,,lOB NUmBeR AT RUN #~, DATE bDP: , SINES aCC:: 69646 h GGED: i2-OCT 8,4 ********************************************************************************* ,,,VP 010,H02 VERIFICATION blSTING PAGE * SCHbUMBERGER~:LOGS INCLUDED WITH: THIS 'MAGNETIC TAPE: *, * CASED MObE:COMPENMATED NEUTRON~bOG (CNb) * * GAMMA RAY bOG (GR) , ~* D~T~ FORMAT RECORD * CNTRY , LOCKS TYPE SIZE REPR ~CODE 2 ENTRY , lin )ATU~ SPECIFICATION BbOC:KS ~Ngl¢~ SERVICE SERVICg [..NIT AP~ AP1 API API FIbE SI: ID ORDER bOG ~TYPE )EPT ~R PSi gPHI PSI PU O0 890 O0 ~44 {NRA PSl 00 000 00 0 0 44 ~CNb P51, :CPS. :00:330 31:0 :0 FCNL PS~ CPS O0 330 30 0 0 4 ! 68 0 68 00000000000000 6'8: 0000000.0000000 I 68 00000000000000 DATA '~P ~,5000 GR -g99 2500 NPHI ~g. T 1. 097 RNR. A ,6758 NCNB 1603:0000 FCNB oooo: ooo 20 '~566 NRAT' 599: 000 23,2910 NRAT 456,0'000 24,414! NRRT' 4bO,O000 2,5195 2,.6816 2.7422 bVP 010 ~{02 VERIFICATION bIMTI~ G PAGE 4 )EPT 10700,0000 GR i8,3047 NPHi {NRA 3,1.152 NC b 1394.0000 FCNL )EPT 1.0600,00002 GR 15,3516 NPHI ~NRA ,7188 : NCNb 1392,0000 :FCNL )EPT I0500,O000GR 25,98:44 NPMI ~NRA 2,7773 NCNb 1349.0000 FCNb o .oooo 2324 NCNb 2026' 0000 FCNL ),EPT 10300,0000: HR 199,9:94:9 NPHI {NRA 2.2168 NCNb i694,0000 FCNL )EPT t, 0100,0000 H~ 42,5156. :NPH:I ~NRA 2.3594 NCNL 1733,0000 FCNL 3EPT 10000,0000 HR RNPA 2.2031 NCNb 9EPT 9900 O000G~ 14,6:816NPHI: RNRA 1~6191 NCNb 2010,0000 FCNL DEPT 98010,0000 GR 16,8086 N,P, MI RNRA ,.. 6768 NCN:L :260:0. 000:0 FCNL Db'PT 970~ 0000 HR 4,3 ,6011 NPH! RNRA :2109 NCNb 1917~0000 FCNL DEPT 9600,0000 GR 21,5234 NPHI RNRA 2.9180 NCNb 1878.0000 FCNL DEPT 9500 0000 GR i9 .9883 NPMI R'NRA 2~3848 ~!CNb 1458;0000 FCNb DEPT 9400,0000 GR 42,0430 NPHI RNRA 1.9404 NCNb 1~36.0000 FCNL DEPT 9300 0000 GR 36 3223 NPHI R. NRA 3~5449 NCNb' 1083;0000 FCNb DEPT 9200 0000 GR 442529 NPHI RNRA 5:3867 NCNb 970~5000 FCNL DEPT 9{.239 5000 GR -999.2500 NPHi RN,~A :7227 NCNb 822.0000 FCNb ** FILE TRAILE~ ** FILE NAME :EDIT ,001 2:8..2227 :NRAT 447,2500 5~:,5605 NRAT .0000 4~,3418 N'RAT .5OOO 14,9902 907'5000 7 ,5000 2.95 I:2 2.7500 2.7:930 NRAT 2,1426 NRAT 2.1152 NRAT 1,8457 2,277~ ,50 00 NRAT 1.9570 8:i,5000 9,5215 NRAT 1,7148 1241,0000 155:~,080t NRAT 1.5000 ;0000 12.6953 NRAT 1,9697 866.5000 20,4102 NRAT 2.5117 64.3,5000 19,.7754 NRAT 2.4688 611.0000 ~,4004 NRAT 1.7900 9 ,0000 36,1328 N'RAT 3.3848 305,5000 53,9551 NRAT 4.3633 180.1250 50,2441 NRAT 4,1602 220,7500 ~VP 010.~02 VERIFICATION LISTING PAGE 5 ;f~RVICE NAM~ : ~ER$ION # . )ATE : ~AXI~UM LENGTH : 1024 "ILE TYPE ; ~EXT FILE ~A~E : ~* T~P~: TR~iLEP ~ERVICE NAME :EDIT )ATE 1g4/12~ 3 ]RIGIN :696 rAPE NAME : 0 r~,NUATION # :01 EX~, TAPE NA~E IO~MENT8 : ~* MEEL TRAILER ** ,~ERVICE MANE :EDIT .,ATE ,84t~/ 3 3RiG7N ~ REEL N AM .F.,