Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
185-233
by Date 20-MAY-2015 Transmittal Number: 93426 BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. MAY 2 0 2015 (BPXA LOG DATA) AOGCC If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing OPEN HOLE Digital Log Data: 04-21, 04-22, 04-33, C-01, C-31, L1-09, L2-03, L3-15, L3-31, L4-30, L5-01, L5-15, L5-16A, L5-16AL1, L5-16AL2, L5-31, L5-33, L5-36 04-21 185-212 251'N y 04-22 185-233 a�j ((, l / 04-33 186-035 51•:(o Please Sign and Return ne copy of this transmittal to; C-01 172-030 .25441 C-31 188-006 2514 gancpdc@bp.con L1-09 185-001 25114 9 L2-03 185-247 )5760. Doug Dortch SCANNED MAY 2 7 2015 L3-15 185-266 73.4-51 Petrotechnical Data Center L3-31 186-034 .25?i52.. L4-30 188-101 25153. L5-01 189-009 251-54 Attn: State of Alaska - AOGCC L5-15 188-109 025155 Attn: Makana Bender L5-16A 206-083 25-4 5p• 333 W. 7th Ave, Suite 100 L5-16A L1 206-084 25.157- Anchorage, Alaska 99501 L5-16A L2 206-085 25 75$' L5-31 190-130 25151 L5-33 189-047 25%f%D• L5-36 189-036 ;5 x(01 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WE! L COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] St..ISt:~EI~ED [] ABANDONED I~ SERVICE [] Plugged back for redrill 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21454 4. Location of well at surface 9. Unit or Lease Name 1089' NSL, 217' EWL, SEC. 26, T11N, R15E 1~--=~' Prudhoe Bay Unit At Top Producing Interval!~'~'''''' 10. Well Number N/A 11. Field and Pool At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 1176'SNL, 64'WEL, SEC. 22, T11N, R15E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 60' ! ADL 28322 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Complelions 10/17/85 11/23/85 8/3/94I N/A feet MSL I Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I0. Depth where SSSV sel I1. Thickness o' Pormafrost 12893' MD/8783' TVD 7697' MD/5795' TVD YES [] NO [] None feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run CET, CNL, GCT, CBL/CCL/GR, GR/CET/CNL 23. CASING, LINER AND CEMENTING RECORD SETI'ING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 114' 30" 1800 # Polyurethane 13-3/8" 68#/72# K-55/L-80 Surface 2521' 17-1/2" 3000 sx CS 111/400 sx CS II 9-5/8" 4 7# L-80 Surface 12201' 12-1/4" 500 sx Class "G "/300 sx CS I 7" 29# L-80 11898' 12888' 8-1/2" 350 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET (MDI None None 11844' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 0 ~ I ?~- I ~:,~ ~ L~ !--; ~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED , ~',.~ i [ J-~ TOC@ 12170'MD 73cuftClass "G"-s(Tueezedto2420psi 7900' Bridge Plug TOC @ 7697' 241 cuft Class "G" 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not on production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATI6 I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL ::)IL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED S EP 2 7 1994 Alsska {Jil & Gas Cons. Commission Anchora~6 · .. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOC-~ MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 12274' 8482' Base Sadlerochit 12694' 8688' GOC 12583' 8634' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~-~ I ~ TitleDri/lin~EngineerSuoervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". RECEIVED Form 10-407 S EP 2. 7 i994 0il & Gas Cons. C0mmissinr~ 4-22 DESCRIPTION OF WORK COMPLETED PRE-SIDETRACK FULLBORE CEMENT PLUG 7/22/94: A Fullbore Cement Plug was pumped to Plug & Abandon the lower wellbore prior to Sidetracking: MIRU & PT equipment. Loaded the well w/300 bbls Freshwater, then pumped 29 bbls of 13.5 ppg Lightweight Class 'G' cement, to place a cement plug over the open perforations located at: 12612 - 12616' MD (Z1B) 12626 - 12670' MD (Z1B) 12686 - 12692' MD (Z1B) Ref. Log: CH CNL 1/23/86. Placed a total of 13 bbls of cement behind pipe & reached 2420 psi maximum squeeze pressure. Held a 1500 psi final squeeze pressure for 1 hour. Followed cement w/1 bbl 80# Crosslinked Gel, followed by 191 bbls Freshwater Flush, followed by Shutdown. Left a cement plug in the lower wellbore with an estimated top of cement at 12170' MD. Rigged down. 7/23/94: PT tubing to 1500 psi for 30 min w/no pressure loss, then RIH & tagged the top of the cement plug at 11995' MD, in the 7" liner. Rigged down. Left the lower wellbore Plugged & Abandoned for Sidetracking. RECEIVED S EP 2 7 ]994 Alaska Oil & Gas Cons. Commission Anchorage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 4-22A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/31/94 06:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 07/30/94 ( 1) TD: 0 PB: 0 PAD T/PAD RIG MOVE PAD T/PAD MOVE TIME. MW: 8.5 Seawater 07/31/94 ( 2) TD: 0 PB: 0 08/01/94 (3) TD: 0 PB: 0 08/02/94 ( 4) TD: 0' ( 08/03/94 ( 5) TD: 0 PB: 0 o) TEST WELL CONT. EQUIP MW: 0.0 Seawater MOVE RIG. RAISE DERRICK & RU. NU TREE/STACK. RU LUBRI. PULL BPV BLEED CRUDE & GAS. REV. CIRC. OUT CRUDE & GAS. TOOL BROCK WHILE PULLING BPV. LD LUBRI. & MONITOR HOLE. CRUDE & GAS COMING T/SURF. CLOSE BLIND RAMS & REV. CIRC. OPEN RAMS/RETRIVE PIECES OF BPV W/MAGNET. RU LUBRI & SET TEST PLUG. PRESS TEST BOPE. LD 4.5"TBG MW: 0.0 Seawater NU BOP STACK. TEST BOPE PULL TEST PLUG W/LUBRI. PULL SINGLE COMP. 4.5" OD. MU LNDG JT. PULL 230 K ON TBG-UNABLE T/PULL SEALS FREE. RU E-LINE & CUT TBG @11814 W/JET CUTTER. RD E-LINE. CIRC WELL CLEAN OF CRUDE & GAS @ 9BPM. LD TBG T/11814. LD 4.5" TBG. MAKE UP BHA MW: 0.0 VIS: 0 PULL SINGLE COMPLETION, 4 1/2" O.D. TEST WELL CONTROL EQUIPMENT.RUN DRILLPIPE. PERFORM INTEGRITY TEST. [RESSURE TEST COMPLETED SUCCESSFULLY. CIRCULATED. HOLE DISPLACED WITH WATER BASE MUE. PULLED DRILLPIE IN STANDS TO 7600' MADE UP BHA #1. PULL DRILLPIPE MW: 0.0 Seawater CUT CASING @7700'. MILL WINDOW IN 9 5/8" CASING F/ 7700-7750'. CIRCULATED. HOLE SWEPT WITH SLUG. POH. PULLED BHA. SERVICE BOP STACK. RUN DRILLPIPE, WASHED TO 7847'. COMPLETED PRECAUTIONARY MEASURES. CIRCULATED @7850'. MIXED AND PUMPED SLURRY. PUMPED 5 BBL H20, TEST LINE. PULLED DRILLPIPE IN STANDS TO 6700'. CIRCULATED. OBTAINED CLEAN RETURNS. HESITATION SQUEEZE. PULLED DRILLPIPE IN STANDS. RECEIVED ~ska u~t & Gas Cons. Commission Anchom~ MEMORANDU, t State o, Alaska Alaska Oil and Gas Conservation Commission TO: David J sol~j~ Chairma~ DATE: July 24, 1994 THRU: Blair Wondzell, ~ FILE NO: P. I. Supervisor FROM: Jerry Herring, ~i~ SUBJECT: Petroleum Inspector pf9kgwbd.doc Peforations PSd~ ARCO, Prudhoe Bay Field PBU D84-22 Saturday, July 23, 1994: I traveled to ARCO's well 4-22 to witness the pressure test and tagging of the perforations plug. The P&A Report is attached. This plug was set in preparation for an upcoming side track on this well. The perforations were from 12,612 - 12,692 feet. The cement plug was pressure tested at 1,500 PSIG for 30 minutes. The plug was tagged at 11,995 feet providing 717 feet of cement on top of the perforations. Summa!ry: I witnessed the pressure test and tagging of the perforations plug on well DS4-22. · Attachment: pf9kgwbd.xls Operator: Operator Rep.: Lease No.: STATE OF ALASKA ALASKA OIL AND GAS CONgER VA TION COMMISSION Plug And Abandonment Report ARCO Well Name: A. J. VARNER PTD No.: 28322 Well No.: DS4-22 Sec. T-R Sec. 26, T11N, R15E Conductor: 13-3/8" Intermediate: 7" Date: 7/23/94 PBU DS4-22 85-233 Meridian: UM CASING DATA: Set (~: 2,521 Ft. Set (~: 12,888 Ft. Surface: 9-5/8" Production: 4-1/2" Set~: 12,201 Ft. Set (~: 11,961 Ft. PLUGGING DATA: 1. Open Hole Plugs: N/A 2. Open Hole Isolation Plugs: N/A 3. Perforation Plugs: 4. Annulus Plugs: Perforations at 12,612' - 12,692'. Top of cement plug tag0ed at 11,995'. The plug was pressure tested at 1,500 PSIG for 30 minutes. N/A 5. Casing Stub Plugs: N/A 6. Surface Plug: N/A Casing Removal: REMARKS: " Casing Cut ~ " Casing Cut ~ " Casing Cut ~} " Casing Cut (~ Feet Feet Feet Feet Distribution; orig - Well F~ ¢ - Operator c- DNR/DOG c - Database c - Rpt File o - insp~tor Inspector (s): PF9KGWBD.XLS STATE OF ALASKA '--- AI_A..,A OIL AND GAS CONSERVATION COMMISS~ .,~ A:PPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend ~ Operation Shutdown~ Re-enter suspended well~ Alter casing Repair well__ Plugging X Time extension ~ Stimulate ~ ~Change approved program ~ Pull tubing__ Vadance~ Perforate Other X ~ Plugback for redrill 2. Name of Operator _ 5. Type of Well: 6. Datum elevation (DF or KB) ARCO Alaska, Inc. Developmen! x KBE = 60' feet Exploratory ~ 3. Address S!ratigraphic 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Service __ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1089'NSL, 217'EWL, SEC. 26, TllN,' R15E' At top of productive interval 1716'SNL, 82' WEL, SEC. 22, T11N, R15E At effective depth At total depth 1176'SNL, 64' WEL, SEC. 22, T11N, R15E 4-22 9. Permit number 85-233 10. APl number 50- 029-21454 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured 12893 feet Plugs (measured) true vertical 8783 feet Effective depth: measured 12852 feet Junk (measured) _ ~ - true vertical 8764 feet Casing Length Size Cemented Structural Conductor 114' 20" ? 1800 # Poly Surface 2521' 13-3/8" 3000 sx CS III & Intermediate 400 sx CS 11 Production 12201' 9-5/8" 500 sx "G" /300 sX CS I Liner 7" 29# 350 sx Class "G" Perforation depth: measured 12626'-12670', 12686'-12692'(Open) 12612'- 12616' (Squeezed) true vertical 8657;8677', 8685'-8688' (Open) 8651 ;8652' (Squeezed) .Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 tubing to 11961'MD Measured depth 114' 2521' True vertical depth 122O1' 11898'-12888' 114' 2521' 8446' 8295'-8781' RECEIVED JUL 1 3 ,1994 Alaska Oil & Gas Cons. Commissior Anchorage Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11844' MD;4-1/2" Camco Bal-O SSSV @ 2181" MD 13. AttaChments Description summary of proposal x Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 7/16/94 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed /,~,//,/ / Title Drilling Engineer Supervisor ' / : ( I FOR COMMISSION USE ONLY Conditions of approval: Notif~"Commission so representative may witness Plug integrity_ BOP Test Location .clearance __ Mechanical Integrity Test__ .. Subsequent form required 10-.../¢0'7 ~V'lonoo 'V l'FlSSna Approved by order of the Commission ? AG O:INglS lYNIgltl0 Form 10-403 Rev 06/15/88 Approved Copy Returned Commissioner JApproval No. ~, ~ .. / ¢ 2-.. Date ?" ! ~- '- ~¢ ~ SUBMIT IN TRIPLICATE DS 4-22 Operational Summary 1. NOtify an AOGCC representative prior to commencing operations. 2. RU cement unit. Bullhead via tubing an abandonment plug from PBTD (12,852' md) to at least 100' md above upper perforation top at 12,626' md. 3. RU E-line. With an AOGCC representative on location to witness the operation, please tag the top of cement to ensure sufficient cement is in place. If the top of cement is found above the packer (11,844' md), cut the tubing 100' md above the top of cement. Otherwise, do not cut the tubing. 4. Freeze protect the upper 2,000'i md of the well via the kinley button at 4,610' md. _ 5. Bleed tubing, inner annulus, and outer annulus to 0 psi. 6. Set BPV. Remove the well house and flowlines. Level the pad and dig out the cellar if required. Prepare pad for RWO. . _ . 7. Move in Drilling Rig. . . 8. Puli 4-1/2'' tubing. Set 9L5/8'' bridge plug @ +8,200' md. ._ _. RECEIVED JUL 1 3 1994 Alaska Oit & Gas Cons. Commission Anchorage VHH July 13, 1994 Anchorage,. maska ":'99510! . REFERENCE: 'ARCO' CASED HOLE FINALS -- 1-o3 --1-15 --2-32 c¥'5--3' 16i ~-llA 4-so ~ 5-06 q %,.%~ 6-22A 9-03 13-28 ~[ 14~2 9~-63 14~4 ~-~? 14-23 ti 14-31 DATE: 01-04-94 15-03 16-20 17-13 18-23A 18-29A 11,23_93 . 11-20-93 11-27-93 11-19-93 11-11-93 11-22-93 ' 11-13-93 ' Perf Record ' .IC~/)O.~W~.O ,Run Prod Profile/5{),;4 Inj Profile/.~mJ-Ye~n~J~ceSI Go R~ Peal Record ~t ~ ~ I~ ~'0 R~ 11-20-93"- SBT/GR/CCL 101q0-11qb~ Run 11-20-93 GR/CC.L., / I~ P3 / i0q 7.-~- H .;t~ Run 11,17.93: . CNL(C~-) - ~75 ~ ~OSO R~ 11-13-93 ' Peff ~ecora ~~ic.,ci ,. ~ 11'27-93 ~od ~ofile ~a~T~fFr~~~ ' 00-tit r 11-27-93 - Pe~ Record t~00--!,l~ R~ 11-28-9 a Pe~ Record: ~0~0 --~ ~ R~ 11-12-93 ' ; Peff Record [~- Ild~ R~ 11.17-93 "packer Setting Rec R~ 11'16-93 Pe~ Record J ~ 0~I~SD R~ 11~20-93 it ~ Detect}~l~[6~lC~ R~ 11-16-93 D~ B~st TDT-P/~ R~ 11-15-93 11-16-93 11-16-93 11-12-93. 11-21-93 11-13-93 11-13-93 11-20-93 11-17-93 11-23-93 1. ~' 1, 5" TBG Cutter ~1 ta00 ~ t0[ 00 Run 1, ~' Packoff GLM ?wcC~ ¼}~ ,~ R~ 1, ~' Pe~ Record ~- I St. ~ R~ 1, ~' Pe~ Record qt~-qS~ R~ 1, ~' please sign and return the attaChed copy as receiPt of data. .ECE,VE Have A Nice Day! John E. DeGrey AT0-1529 Sch Sch Sch Sch Sch Sch Sch Atlas Atlas Sch Sch Sch Sch. Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch APPROVED ~:-..,i""'-~ ~'~ch°ro.-,,o' O°q~,is~io~~ Trans# 94004 · # CENTRAL FILES # CHEVRON # BPX # STATE OF ~KA # PtHLLIPS # ANO8 GEOLOGY # EXXON # MOBIL * The corrected API# for 18-29A is 50-029-22316-01 ARCO ALASKA, INC. P~ O. BOX i ANCHORAGE, ALASKA 9 DATE' 9-i 9-9t REFERENCE' ARCO CASED HOLE FINALS '2-6 5-3i-9i F'ERF RECORD RUN i, 5' '2-9 8-i 6-9t F'EF:F RECOF:D RUN '2-26' ~-~i-9i PERF RECORD RUN '-3-27 8-i6-9t F'ERF RECORD RUN t, 5' -4-22 S-27-9t PERF RECORD RUN i., 5" "5-5 5-24-9i PERF RECORD RUN i, ~ S-i.--"':' 8-28-9i F'ERF RECORD RUN t , 5 · 7-28 7-2..=..-9i PERF RECORD RUN t, 5:" ~-i8 8-i8-9i PERF RECORD RUN i., 5' i i-4 7-29-9i PERF RECORD' RUN t., S' -.ii-6 7-22-9i PERF RECORD RUN i., '-t2-i4 8-6-9i PERF RECORD RUN i, .5' -t2-28 S-29-9i PERF RECORD RUN i, .i.5-28 8-i9-9i PERF RECORD RUN t., ~' '"i4-9B 8-2i-9i PERF RECORD RUN i, 5" <iS-2S 8-i-9i PERF RECORD RUN t, S' PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. RECEIVED BY ~~_J~~ HAVE.A NiCE DAY! SONYA WALLACE ATO- i 529 HLS fILS HLS HLS HLS HLS HL$ HLS HLS HLS HLS HL$ HLS HLS HLS HLS HLS HLS HLS HLS HLS HLS D I ~.'TR l BUT I ON CENTRAL FILES EFIEVRON_ . EXTENSION EXPLORATION EXXON MARATHON MOBIL F'HILLIF'S PB WELL FILES R & D BF'X STATE OF ALASKA TEXACO * THF CORRECT AF']:~ FOR i-iB IS 19 THE CORRECT AF'I~ FOR 2-S IS 5~-~29-2~77. ~ THE CORRECT APl' FOR 5-27 ]:S 50-029-2ti09. % THE CORRECT LOG INT. FOR 5-i2 I~* 88J6'-9249'. $ THE CORRECT AF'I~ FOR i4-9B IS 50-029-20~34-(:'2. RECEIVED OCT 0 3 199 STATE OF ALASKA ~ ALASK'-'"IL AND GAS CONSERVATION C IMISSION REPORT-OF SUNDRY WELL OPERATIONS .. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing ~ Alter casing Repair well Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 971' FSL, 242' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1140' FSL, 1171' FWL, Sec. 23, T11N, R15E, UM At effective depth 1402' FSL, 1237' FWL, Sec. 23. T11 N, R15E, UM At total depth 1440' FSL, 1247' FWL, Sec. 23, T11N, R15E, UM 5. Type of Well D~v~oment Exl~mm~y Straligraphic 6. Datum of elevation(DF or KB) 62' RKB 7. Unit or Property Prudhoe Bay Un~ 8. Well number DS 4-24 9. Permit number/approval number 85-301 10. APl number 50 - 029-21508 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11350 feet Plugs(measured) 8792 feet Effective depth: measured 11298 feet true vertical 8758 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1810# Poleset 80' 80' Surface 2538' 13-3/8" 2900 sx 2538' 2538' Production 10900" 9-5/8" 500 sx 10900' 8496' Liner 775' 7" 350 sx 10590'-11345' 8294'-8788' Perforation depth: measured 11144'-11155', 11158'-11165', 11194'-11218', 11222'-11238' true vertical 8657'-8665', 8668'-8671', 8689'-8705', 8708'-8718' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 & 4-1/2", 12.6# L-80, 10657. MD Packers and SSSV (type and measured depth) Brown 3-H Packer @ 10549' MD Camco 'BAL,-O',;S$s~ @ 2163' MD 13. Stimulation or cement squeeze summary 14. Intervals treated(measured) N/A ' ~''''.~-,,. ~' '""-,-,'~- ';;:;' -~ "' ~" '%.. '~' ', /--~ ,.~' . ~.., -~ ' :,,v ,. - . Treatment description including volumes used and final pressure ,~J"~,~;\,~ Reoresentative [;)gily Ayeraqe Production ~ Data OiI-Bbl Gas-Md Water-Bbl Casing Pressur~~ ' '?~130 Pressuro Prior to well operation 1557 15895 40 1060 "'""~899 Subsequent to operation 2196 14207 77 1860 1818 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations ~ Oil~ Gas ._.. Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-4~04' Rev 06/-15)88 - T~le Sr. Area Operations Engineer SUBMIT IN DUPLICATE SUN/nb A II,Y REPO~ OF WI~,I, OPEi .rlONS DS 4-24 Pcrfqrating O1o~rations: ARCO Alaska, Inc. perforated DS 4-24 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 11/3/90. The intervals perforated were the following: 11144'-11155' and 11158'-11165' MD (Reference Log: BHCS dated 12/31/85). Produced fluids were in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short s,~mma, ry of the work is given below: Began perforating operations on 11/3/90. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. Perforated 11144'-11155' and 11158'-11165' MD at 4 SPF (ref: BHCS of 12/31/85). SI well, POOH, and confirmed all shots fired. Rigged down and secured well. WDM: 6/12/91 STATE OF ALASKA ALASK,' IL AND GAS CONSERVATION C IMISSION REPORTOF SUNDRY WELL OPcRATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate ~ Pull tubing Alter casing ~ Repair well Olher 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1089' FSL, 217' FWL, Sect. 26, T11 N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sect. 22, T11 N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sect. 22, T11 N, R15E, UM 5. Type of Well Development X Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 60 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4-22 J 9. Permit number/approval number 85-233 10. APl number 50 - 029-21454 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured 12,893 feet Plugs(measured) true vertical 8783 feet Effective depth: measured 12,852 feet true vertical 8764 feet Junk(measured) Casing Length Size Cemented Conductor 114' 20" 1800# Poly Surface 2521' 13-3/8" 300 sx and 4005 sx Production 12,201' 9-5/8" 500 sx and 300 sx Liner 990' 7" 350 sx Measured depth 114' 2521' 12,201' 11,898-12,888' True ve~ical depth 114' 2521' 8446' 8295-8781' Perforation depth: measured 12,626-12,670', 12,686-12,692' true vertical 8657-8677', 8685-8688' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80 @ 11,961' MD Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11,844' M D 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure JI. IN 1 71991 & Gas Cons. Comm lo. ' chorage 14. Prior to well operation Subsequent to operation Representative Daily Averaoe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Well shut-in, unable to flow Well shut-in, would not flow Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X.~_ Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~/~ 0')'~ , ~ -- Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUN/nb Date SUBMIT IN DUPLICATE ~AII JY REPORT OF WEI JIJ OPEl. __CIONS DS 4-22 Perforating Operations: ARCO Alaska, Inc. perforated DS 4-22 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 5/27/91. The intervals perforated were the following: 12626-12654' and 12686-12692' MD (Reference Log: CH-CNL dated 1/23/86). Produced fluids were in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximom expected surface pressure. A short summary of the work is given below: Began perforating operations on 5/27/91. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. Perforated 12626'-12654' MD and 12686'-12692' MD at 4 SPF (ref: CH-CNL of 1/23/86) in 2 gun runs. SI well, POOH, and confirmed all shots fired. Rigged down and secured well. WDM: 6/10/91 ARCO AL.A~TKA, iNC. P ~ 0. BOX i ,3,(-.':,36,.'} Ai"~F:HORAGE ALA~I<A ~ c.,~; ~ ,.'.--, --- I · : ..,' I D;~TE ' 8-'29-9(-5' RE:F'FRENCE' ARco F'RE3S'URE DATA ~S-2 '7 '7 -'? -9':D 4-2Z 6-i 8- 9',:D 4-S~ 6-'i 6-9(D ~::~ -- ~ (~) ~ 2 - '7 ? - ::i 9 5-i i i 2-28-89 ~-:m'7 i i - i 2-89 7- i 6-24- 9 7-i '3, 6-2(D-9~D 9-S6 6-29-96, i 6-4 '7- i -9'3, i6-6 6-22-9~ i 6-7 6-27-9,S, , i ~ ~' ~ WGI-5 6-8-9~ WG i -7 6- 8- 9 ~D Bi-iF'--STATiC GRADIENT BHF .... S'TATiC GRADIENT BHP--$TATI;",-. GRADIENT BHF'--J,'TAT I C GRADiE:'NT BiJ, F'--S-'TAT I C GRADIENT ;:"-'" ~" I [; · ,=, I-, F--~-~, TAT GRADIENT BHF'--$'i-AT I C GRADIENT BHF'--~TATIC GRADIENT BHF'--$TATIC GRADIENT BHF'--~gTAT I C-GRADIENT BHP--S'TAT IC GRADIENT BHF .... :~TATIC GRADIENT BHF .... ~TA'F!C GRADIENT BHF'--:CTAT I C GRADIENT BHF'--S~TAT lC GRADIENT BHP--S'TATIC GRADIENT BHP--$TATIC GRADIENT BHP--S:TATIC GRADIENT BHP--&'TATIC GRADIENT BHF'--$TATIC GRADIENT CAP'ICO C A ~ C 0 CAtiCO CAMCO CAMCO C': A h~ C 0 C A i'4 C 0 CAMCO CAMCO CAMCO CAMCO C A H C 0 CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CA~'~O F'LEAS'E ZIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DA]A~ HAVE A NICE DAY; S E? - 6 1990 SALLY HOFFECI<ER ~]85klit Oil & Gas Cons. ATO- i .... Anchorage APPROVED 'FRAN$~ 9-' DISTRIBUTION CENTRAL FILES CHEVRON D & M .~- EXTEN~'ION EXPLORATION ~~ EXXON MARATHON ~ MOBIL F'HILLIF'~' FIB WELL FILES R & D BF'X $'FATE OF ALA~TKA - TEXACO -. ' ..... -" .. STATE OF ALASKA ~ ~ '- ;: ALASKA~-''. AND GAS CONSERVATION CC /IISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well ~ Perforate Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. BOX 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11 N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sec. 22, T11 N, R15E, UM 5. Type of Well Development Exploratory StralJgraphic 6. Datum of elevation(DF or KB) 60 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-22 9. Permit number/approval number 85-233/9-739 10. APl number 50 - 029-21454 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12893 feet Plugs(measured) true vertical 8783 feet Effective depth: measured 12852 feet true vertical 8764 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 114' 20" 1800# Polyurethane 114' 114' Surface 2461' 13-3/8" 3000 sx CS III & 400 sx CS II 2521' 2521' Production 12141' 9-5/8" 500 sx CI 'G' & 300 sx CS I 12201' 8446' Liner 990' 7" 350 sx CI 'G' 12888' 8781' Perforation depth: measured 12642-12650'; 12650-12670' true vertical 8668-8673'; 8673-8685' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 11961' MD Packers and SSSV (type and measured depth) Baker SB-3 packer @ 11844' MD; 4-1/2", Camco Bal-0 SSSV @ 2181' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Well shut in. Well shut in. Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 449 ~'.MI-I ~' .I I~.n,h~r ATC)-I/17R .ql-I SUBMIT IN DUPLICATE DS 4-22 DESCRIPTION OF WORK COMPLETED KINLEY BUTTON INSTALLATION 1 1/1 2/89 · MIRU, & PT to 2500 psi. RIH w/Kinley Perforator and shot a 12/64" orifice Kinley Button at 9770' MD. POOH. RIH and shot a 6/64" orifice Kinley Button at 4610' MD. POOH. RD. 3/26/90 - MIRU, and RIH to perform Temperature/Pressure logging. Log showed A/L gas injecting at Kinleys. Fluid level below lower Kinley Button. POOH. RD. The well will not flow, and is currently shut-in. A Perforation Breakdown and a Stress Fracture Treatment are currently being evaluated for the well. STATE OF ALASKA ALAS'~ ~)IL AND GAS CONSERVATION APPLI(., TION FOR SUNDRY APPROVAES:' 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approv'~ program "~ull tubing Variance Pe'rfor~te , O~her 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM. At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, UM. At effective depth At total depth 1176' FNL, 64' FEL, Sec. 22, T11N, R15E, UM. 5. Type of Well Development X Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60 RKB feet 7. Unit or Property Prudhoe Bay Unit 12. Present well condition summary Total depth: measured true vertical 8. Well number DS 4-22 9. Permit number 85-233 10. APInumber 50-029-21454 11. Field/Pool Pmdhoe Bay Oil Pool 12,893 feet Plugs(measured) 8783 feet Effective depth: measured 12,852 feet true vertical 8764 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth COnductor 114' 20" 1800g Polyurethane 114' 114' Sudace 2461' 13-3/8" 3000 Cl 'G' & 400 Sx CS II 2521' 2498' Production 12141' 9-5/8" 500 Sx Cl 'G' & 300 Sx CS I 12,201' 8446' Liner 990' 7" 350 Sx Cl 'G' 12,888' 8781' Perforation depth: measured 12,642- 12650'; 12650- 12670' true vertical 8664 - 8668'; 8668 - 8677' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 11,961' MD. Packers and $SSV (type and measured depth) Baker SB-3 Pkr @ 11,844' MD; 4-1/2", Camco BaI-O SSSV @ 2181' MD. 13. Attachments Description summary of proposal 14. Estimated date for commencing operation June 1990 16. If proposal was verbally approved Name of approver Date approved Detailed operations program BOP sketch X X I 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer FOR COMMISSION IISE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity , BOP Test Location clearance , . Mechanical Integrity Test Subsequent form required 10---' ORIGINAL SIGNED BY LONNIE C. 'SMITH" Commissioner Date Approved by order of the Commissioner Approval No.(~ _~7/.~..., Form 10-403 Rev 06/15/88 Pi ra-PPlWR-1 Approveo Copy · F~et_~n._.ed_. SUBMIT IN TRIPLICATE Drill Site 4-22 ARCO Alaska, Inc. intends to perform a STRESSFRACTM treatment on DS 4-22. The treatment will be performed as follows: 1. Make a gauge ring run with wireline. 2. Load the casing annulus with dead crude. Pump down tubing for injection rate and pressure with dead crude. 3. Rig up electric line. RIH with STRESSFRACTM tools and ignite opposite perforations at 12,646' to 12,670' in four tool runs. 4. Pump down tubing with dead crude for injection rate and pressure. 5. Run temperature tool and log 12,750' to 12,400'. 6. Rig down E-line. 7. Unload the well and obtain a stabilized test. Note: STRESSFRACTM is a service of Servo-Dynamics Inc. of Calgary, Alberta. 6 5 2 ! 1 I C0~LED TUBINg UNIT BOP EOU ! PMENT 1. ~:~C)C)O PSI 7" WELLH[.AD CONNECTOR IrLAhG£ 2. 5000 PSI4 1/16" PIPE RA~$ 3. ~C)00 PSI4 1/6" HYDRAULIC SLIPS 4. ~00 PSI,It 1/6" SHEAR RA~S 5. 5000 PSI4 1/6" BLIND RAIDS 6. 5000 PSI4 1/16" STUFFING BOX 2 H]REL]NE BOP EOUIPHENT 1. 5000 PS, I ?" WELLHF. AD CONN£C10R FLANGE 2. 5000 PSI WIRE:LINE RAI~S (VARIABLE · 3. ~000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, ]:NC. F'.O. BOX iGE~S6~,} ANCHORAGE, ALA~'KA 995t0 DATE' 4-t 8-90 REFERENCE' ARCO CASED HOI. E FINALS 4--'~'? S~"26-"9~) TEHF' 5-4 S"-2S-90 TEMP iS-iS 4-2-90 F'RODUCTION F'ROFIL. E i 4-8 S'-29-9~ F'I T~ i4'-'SS 4-2-98 LEAK DETECTION iS-S S-22-9~ PRODUCTION FIROFILE i6-i5 S-'St-'9~ PRODUCI'ION PROFILE t 7-S 4-i -9~ F'IT~ PWDW2-i S-28-9~ INJECTION PROFILE PWDW2- i S-~-'9~ I'EMP RUN t , t" RUN i, 5" RUN t , 5 ' RUN t , ~'~' RUN t, 2"&.5' RUN t, 5" RUN i , 5" RUN t , 5' RUN t , 5:" RUN t, 2' F'I_EASEE SIGN AND RETURN THE ATTACHED COPY AS RECL;.IF'I' OF I)ATA. RECEIVED BY ................... ~_ FIAVE A NICE DAY! I E£EIVED SALLY HOFF'ECKER ATO- t 529 ./ 2 6 1990 APR TRAN$~ 9 ~? DISTRIBUTION ~,ENTRAL FILES CHEVRON D & M EXTEENSION EXPLORATION EXXON MARATHON MOBIL ~ PHILLIPS PB WEL. L F'ILE$ R & D -.-'"' BF'X STATE OF ALASKA TEXACO C A N C 0 CAM(.]() CAMCO C A it C 0 CAMCO C A lq C 0 ()ANCO CAMCO CAMCO C A M C 0 ARCO ALASKA, INC. F'.O. BOX i06S60 ANCHORAGE, ALASKA 995 i ~ DATE' i-3-90 REFERENCE' ARCO CASED HOLE FINALS 2-9 tt-ti--89 PERF RECORD 4-5 ii-26-89 PERF RECORD 4-22 tt-i2-89 PERF RECORD ~-4 i0-i-89 F'ERF RECORD J ii-27 9-3-89 PERF RECORD t2-ii tt-i6-89 PERF RECORD i3-i3 ii-8-89 PERF RECORD t3-27 tt-8-89 PERF RECORD i3-29 ii-9-89 PERF RECORD t3-3~ tt-9-89 PERF RECORD t4-25 9-i3-89 F'ERF RECORD i5-i4 t~-27-89 DIFF TEMP i7-3 ti-i-89 PERF RECORD PLEASE SIGN AND RETURN THE ATTACHED RECEIVED BY '""' 'RECEIVED · .:.ALLY i-IOFFECKER: ATO-i 529 JAN ! 0 1990 _Alaska Oil & Gas Con~. C_Qm~ CENTRAL FILES CHEVRON D&M ~ EXTENSION EXPLORATION ~ EXXON" " MARATHON- ~.-..HOBIL RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUNS' RUN RUN COPY AS RECEIPT OF DATA~ APPROVED, _~._ 'T'RANS-~ ~' PHILLIPS PB WELL FILES R'& D · ,,-BF'X ' STATE OF ALASKA ~,~ TEXACO FtL.~' HLS HL~-' HLS HL£ I-iLS H L.':: HLS HL$ HI_S HLS I-tLS HLS STATE OF ALASKA ALASK~'"")IL AND GAS CONSERVATION ('-'~MISSION REPOR' OF SUNDRY WELL OPERATI( i I§ ,. Operations performed: Operation shutdown ~ Stimulate Plugging _ Perforate X. Pull tubing Alter casing Repair well . Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1089' FSL, 217' FWL, Sect. 26, T11 N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sect. 22, T11N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sect. 22, T11 N, R15E, UM 5. Type of Well Devek)pment Exl~ml~ Stratigraphic 6. Datum of elevation(DF or KB) 60 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4-22 9. Permit number/approval number 85-233/9-954 10. APl number 50 - 029-211454 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 114' . Sudace 2521' Production 12,201' Liner 990' 12,893 feet Plugs(measured) 8783 feet 12,852 feet 8764 feet Junk(measured) Size Cemented 20" 1800~ Poh/ 13 3/8" 300 sx and 4005 sx 9 5/8" 500 sx and 300 sx 7" 350 sx 11. Field/Pool Prudhoe Bay Oil Pool True vertical depth 114' 2521' 8446' 8295-8781' Perforation depth: measured 12,642-12,670' true vertical 8664-8677' Measured depth 114' 2521' 12,201' 11,898-1 2,888' , ,~3 Tubing (size, grade, and measured depth) 4 1/2", 12.64t, L-80 @ 11,961 MD ~C ~[i ''; JJ ''~ :' ~ Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11,844' MD :';~sl'~'~t o[j ~ ~3 Col~s. [;o~P:~,:~:'~: ~ 'l ~ Ar:ch0rage 13. Stimulation or cement squeeze summary Intervals treated(measured) 14. Treatment description including volumes used and final pressure Prior to well operation Representative Dai_ly Average Production or Injection Data OiI-Bbl Gas-Mc{ Water-Bbl Casing Pressure Well shut-in, unable to flow Wailing for lift Well shut-in, gas line. 16. Status of well classification as: OilX Gas .._. Suspended...._ Service Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Tubing Pressure Operations Engineering Manager 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~~_ ~Z~ Title Form 10-404 Rev 06/15/88 _-klLY REPORT OF WELL Ot. ~,4ATIONS DS 4-22 Kinley Button Installation Operations' Began perforating operations on 12 November 1989. Rig up perforating unit, pressure test BOP's and lubricator to 3000 psi, okay. RIH with Kinley Senior Perforator #1 and tied-in with CCL at SSSV. Shot 12/64" Kinley button at 9770'. Flag line and POOH, confirmed Kinley Senior Perforator fired. RIH with Kinley Senior Perforator #2 and tied-in with CCL at SSSV. Shot 6/64" Kinley button at 4610'. POOH, confirmed Kinley Senior Perforator fired. Rig down and secure well. RECEIVED .. £ Anchoia~e WDM: 12/11/89 ARCO Alaska, Inc. Prudhoe Bay _.-,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 26, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Permit Dear Mr. Chatterton: No. 85-223 Attached, in triplicate, is the Application for Sundry to be performed on the above-referenced well. Approval detailing work Very truly yours, D. F. Scheve DFS/WDM/ry Attachments cc: J. Dietz, BP Exploration J. Gruber, ATO-1478 Pl(DS4-22)Wl-3 RECEIVED OCT ~;,it & Gas Cons. Cornn-~ir~sion Anchora,93 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE Of ALASKA ALASKA" 'LAND GAS CONSERVATION C( VIISSION APPLICA ION FOR SUNDRY APPROVALS ,ype of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60' RKB 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sec. 22, T11 N, R15E, UM 8. Well number DS 4-22 9. Permit number 85-233 10. APl number 50 - 029-21454 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 12893 feet Plugs(measured) 8783 feet Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12852 feet 8764 feet Junk(measured) Length Size Cemented Measured depth True vertical depth 114' 20" 1800 # Poly 114' 114' 2521' 13-3/8" 300 Sx & 4005 Sx 2521' 2521' 12201' 9-5/8" 500 Sx & 300 Sx 12201' 8446' 990' 7" 350 Sx 11898-12888' 8295-8781' measured 12642-12670' ~ ~ C ~ f~,/~ D true vertical 8664-8677' 00T .!.~.,'-~ Tubing (size, grade, and measured depth) 4-1/2", 12.6:~, L-80 @ 11961' MD Packers and SSSV (type and measured depth) Baker SB-3 Packer ~ 11844' MD, CAMCO Bal-O SSSV ~2181'MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation November 3, 1989 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby,..,certify that the foregoing is true and correct to the best of my knowledge. Signed ~¢'~~~~ Title Operations Engineering Manager Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- Original Signed By Approved by order of the Commissioner David W,.,. Johnston Date 15. Status of well classification as: Gas Suspended FOR COMMISSION U~E ONLY IAppr°va' N°' /Nppro~/ed CoPY Returned Comm,%~ionor Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DESt. .iPTION SUMMARY OF PRO, OSAL ARCO Alaska, Inc. proposes to insert two check valve type Kinley gas lift orifices in the tubing of producer DS 4-22 to provide artificial lift support. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently shut-in following a CTU squeeze for gas shutoff purposes during which all perforations were squeezed. After reperforating the Lower Romeo interval 12642' - 12670' the well has not been able to flow to the surface. Produced fluids will be in the wellbore during perforating operations. The reservoir pressure at the perforation depths is approximately 3800 psi. Proposed Kinley gas lift orifice depths: 4620' MD 9770' MD WDM: 10/11/89 Anchorag,.',' 1. $000 PSi 7" W[LLH~M:) CONN[¢TOR IrLANG[ 2. 5000 PS1 WIR[LIN[ RAJAS (VARL~BL[ $1Z[) 3. $000 PSi 4 1/6" LUBRICATOR 4. 5000 PS: 4 116" fLOW TUB[ PACK-Orr 2 HZREI. INE, BOP EOUIPHENT ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 4, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22, Approval No. 9-044 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/MJB/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 4-22) W1-3 RECEIVED OCT 1 1 B89 .tUaska Oil & Gas Cons, CommissiOn '': ~chorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKA, .AND GAS CONSERVATION CO' IlSSION -' REPORT OF SUNDRY WELL OPEHATIONS Operations performed: . Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sec. 22, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic 6. Datum of elevation(DF or KB) 60' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4 - 22 9. Permit number/approval number 85 - 233 / 9 - 044 10. APl number 50 - 029 - 21454 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12893 feet Plugs(measured) true vertical 8783 feet Effective depth: measured 12852 feet true vertical 8764 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 114' 20" 1800# Polyurethane 114' 114' Surface 2461' 13-3/8" 300 sx CS III & 400 sx CS II 2521' 2521' Production 12141' 9-5/8" 500 sx Gl 'G'& 300 sx CS I 12201' 8446' Liner 990' 7" 350 sx CI 'G' 12888' 8781' Pedorationdepth: measured 12626-12642'; 12642-12670' ~ EEEIVEP true vertical 8655- 8663'; 8663-8676' OCT l i 1989 Tubing (size, grade, and measured depth) 4-1/2", 12.6:~, L-80, PC Tubing @ 11961' MD Alaska 0ii & 6as Cons. O0mmisS[0r Anchorage Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11844' MD; 4-1/2", Camco BaI-O SSSV@ 2181'. 13. Stimulation or cement squeeze summary Intervals treated(measured) SEE ATTACHED Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure 830 13036 0 .... 0 0 0 .... Tubing Pressure 776 0 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~~,~~///~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE DS 4-22 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR GAS SHUT-OFF 5/30/89 : MIRU CTU & Stimulation Equipment. PT Equipment to 4000 psi. RIH w/CT and washed perforations at: 12642 - 12670' MD Ref. Log: CNL 1/23/86. Pumped the following treatment: 50 bbls 12% HC1 w/10% Xylene, followed by, 72 bbls 12-3% HC1-HF, followed by 25 bbls 12% HC1. Displaced w/Diesel. POH. Rigged down. 6/2/89 : The Squeeze was performed as follows : MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 38 bbls cement, squeezing perforations : 12642 - 12670' MD Ref. Log: CNL 1/23/86. Contaminated cement with 50 bbls Bentonite. Cleaned out contaminated cement from WB. 7/21/89 : Reperforated: 12650 - 12670' MD Ref. Log: CNL 1/23/86. 8/4/89 : Reperforated: 12642- 12650' MD Ref. Log: CNL 1/23/86. 8/13/89 : Jet pumped well to flow. Well will not flow. ARCO Alaska, Inc. Prudhoe Bay ~-ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager /61NAL August 21, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22, Permit No. 85-233 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Sincerely, D. F. Scheve DFS/CMH/jp Attachment cc: J.S. Dietz, BP J. Gruber, ATO-1478 PI(DS 4-22)W1-3 Nast~ 0it & S~s Co~s. C0m~ssl0t~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C ._.. STATE OF ALASKA ALASKA ,_AND GAS CONSERVATION CC'--"',AISSION 0 RIG IN ^ L APPLICAflON FOR SUNDRY AP,-,ROVALS i ype of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Vadance Perforate __ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60 RKB 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11 N, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL, Sec. 22, T11 N, R15E, UM 8. Well number 4-22 9. Permit number 85-233 10. APl number 50 - 029-21454 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 12893 feet Plugs(measured) 8783 feet Effective depth: measured 12852 feet true vertical 8764 feet Junk(measured) Casing Length Size Cemented Conductor 114' 20" 1800# Polyurethane Sudace 2461' 13-3/8" 3000 sx CS III & 400 sx CS II Production 12141' 9-5/8" 500 sx CI 'G' & 300 sx CS I Liner 990' 7" 350 sx CI 'G' Perforation depth: measured 12642-12670' true vertical 8668-8685' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 11961' MD Measured depth 114' 2521' 12201' 12888' True vertical depth 114' 2521' 8446' 8781' RECEIVED AUG 2 2 1989 ~ A/aska Oil .& Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) Baker SB-3 packer @ 11844' MD; 4-1/2", Camco Bal-0 SSSV @ 2181' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation August 1989 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby,~iertify that the foregoing is true and correct to the best of my knowledge. Signed .~,4~_ ~ /~~"~' Title Operations Engineering Manager FOR COMMISSION U~l= ONLY 15. Status of well classification as: Oil x Gas Suspended Date Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commissioner LONNIE C. SMITH Commissioner Approval No. ~ .... '7'~.~ ~ Approved Copy Returned Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 4-22 Gas Lift Installation Project AFE #AP2162 Preliminary Procedure Ob!ective: o . . . . If necessary, install Kinley buttons and/or packoff gas lift mandrels for gas lift. MIRU wireline unit and make gauge run in well. MIRU electric line unit and run collar Icg. Perforate and install check valve-type Kinley button at +3500' TVD (3759' MD). Put well on gas lift, clean up and test well. If artificial lift performance is not satisfactory, set Kinley button at +_6200' TVD (8412' MD). Set nipple reducer in XN Ln at 11948'. Install wireline-run packoff gas lift mandrel across top Kinley location at +_3759' MD. 6. Bring well in and test. Other well information: Current status: Static bottomhole pressure: Static bottomhole temperature: H2S: Shut in 3710 psi at 8600' SS 175° F 3 ppm reported 6/89 RECEIVED AUG 2 21989 Alaska 0il & Gas Cons. Commission Anchorage CMH/059 AFl#: ~214,54-C~ .~e: 10-27-85 -~'~'.Completion Date: 1-26-86 ~,,-~al RKB: ~ Hanger Type: FMC Gen IV .ap of ~dler~hfl: 1~7~ Maximum Hole Angle: 61e ~1~ Ru~: Dles~.4 N~I Reference Log' CH~NL 1-23-~ All Depth~ are JKB MD ~ T~ of Equipment. Jeweky 2181' 11844' 11948' 11960' 11961' 11943' Well Type: Producer New I~l WorkoYer [~ Hanger: 18" Angle Through Sad. ' 619 4 I/2" Camco ~aI-O SSSV Nipple ID=3.815' Baker SB-3 Packer Offs XN Nipple ID=3.725' Baker Shear Out Sub Tub~"~g TaB 4 1/2' ELM Tubing Tail: 6-5-86 2521' Casing 12201' Casing 12888" Liner 11961' PC Tub~g 3 4,5 7 Ca~ng and tubing 1.1 $/8" 72e L-~ 0 9 5/8" 47e L-~ 0 7' ~ L-~ 11~' 4 1/2' 12.~ L-~ 0 6-5-86 CTU SQZ: 7-10-87 6-5-86 CTU SQZ; 7.10-87 RPen': 7-24-87 PBTD = 12852' 'rD= 12893' 12626.12642 1A/lB 16 0 12642-12670 1A/lB 2B 4 Datum 8500" S~ = 12430' MD 8600' S~ = 12635' MD Revision Date: 9-6-87 (GD #51) Reason: Zone data Previous Revision: 8-11-87 6 5 4 3 2 COILED TUBINt3 UNIT BOP E0u ! P~ NT 1. 5000 PSI ?" WELLHEAD CC)NNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 3 I · 2 H ] REL ! NE BOP EOU ] PMENT 1. 5000 PSI ?" WELLHEAD CONNECTOR rLANC;£ :2. 5000 PSI WIRE:LINE RAU5 (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, INC. P.O. BOX 100360 ANCHORAGE, ALASKA DATE' 8-tt-89 REFERENCE: ARCO CASED HOLE FINALS 2-i4 7-t4-89 PITS RUN ~-oo 7-t6-89 PITS RUN 4-~ 8-4-89 COLLAR/PERF RUN 4-25 7-t2-89 TEMP RUN 7-5 7-t9-89 GR/CCL RUN 7-7A 7-30-89 SPINNER/TEMP RUN ?-t4 7-28-89 SPINNER/TEMP RUN 7-33 7-23-89 COLLAR RUN tt-i8 5-i8-89 TMD RUN ti-24 5-t7-89 TMD RUN t~-25 7-t2-8~- TEMP RUN t2-38 7-23-89 COLLAR RUN t4-t5 7-20-89 PITS RUN ~4-t& 7-t7-89 PITS RUN i4-28 7-2t-89 PITS RUN i4-24 7-22-89 PITS RUN t, 2 t, 2 t, 2 t, t, .5 t, 2 PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA HAvE A NICE DAY! SALLY HOFFECKER ATO-t 529 V~IBBi(BOji&~aBCoD,~,GOrlBiI1]i~i~_.~s~, 89~4t DISTRIBUTION PHILLIPS CENTRAL FILES -,.~ CHEVRON F'B WELL FILES D&M R& D EXTENSION EXPLORATION ~ BPX EXXON ..-'-STATE OF ALASKA MARATHON -.-'"' TEXACO MOBIL · · # · · · CAMCO CAMCO 'ATLAS CAMCO CAMCO OTIS OTIS CAMCO HLS HLS CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO * THE CORRECTED API~ FOR t4-t6 IS 50-029-20608. ARCO ALAS'KA: INC~ P.O. BOX i ANCHORAGE, ALAS'K A 995i DATE' 7-26-89 REFERENCE' ARCO CASED HOLE FINAL~ t --'75._. 7-'-'0-89... ACBL/VDL-GAMMA RUN. i , ..-~ ' ,~-29 7-i.~-~9 GR ~'PEC. TOOL RUN 2, 5' 4-2C, 7-2~-89 COLLAR/PERF RUN ~ , 5~ ,~ '~" 7-2t-89 COLLAR/F'ERF I::Ui'~ i, 9-4 'Z-t9-89 COLLAR/F'ERI:;' RUN ~, 5' ~-,: ,-~ ,~, CULLAR/PERF RUN ~, '~' ~6-4 7-22-89 COLLAR/PERF RUN i , 5' ~8-24 7-2~-89 CBT RUN i ~ 5' ~8-24 7-28-89 CET RUN ~, 5' PLEASE ,~IGN AND RETURN- THE ATTACHED COPY AS RECEIPT~OF DATA. RECEIVED BY SALLY HOFFECI<ER ATO-iS~. DISTRIBUTION CENTRAL F!L~$ CHEVRON DaM EXTENSION EXPLORATION EXXON ............ MARATHON MOBIL_ PHILLIPS F'B WELL FILES R & D BF'X ,~'I'A'I'E OE ~LAS'KA TEXACO A'FLA~,' :,.,' C H ¢:1 I" L A ,~",' Al L ~:':~ £ A'T'LA.':¢ A'T' i_A,"£ Ai"LA:? ~'Ci-t ~'CH ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 16, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Permit No. 85-233 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 4-22)W1-3 WELLS3/96 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C ~---- STATE OF ALASKA .... A,_ ~KA OIL AND GAS CONSERVATION COMb,. ..-.ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend__ Alter casing __ Repair well __ Change approved program ~ Operation shutdown __ . Re-enter suspended well __ Plugging __ Time extension ~ ~Jimulat Pull tubing ~ Variance __ Pedorate %'-'~er ~ 2. Name of Operator A 'n ,,',r,, A!a C ~.3 T'nr. 3. Address 'P_ C). Bow 100_360. 4. Location of well at surface 1 9' FSL 217' ',~ ~'p of pro~lSct,ve ,nterva~~' 1716' FNL, 82' FEL, At effectNe~" depth At total depth 1176' FNL, 64' FEL, Anchorage, ,AE 99510 Sec. 26, TllN, RI5E, UM Sec. 22, TllN, R15E, UM Sec. 22, TllN, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) §0' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 4-22 9. Permitnumber 85-233 10. APInumber 50-- 029-21454 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing LenCh Conductor 114' Surface 2521' Production 12201' Liner 990' 12893 feet 8783 feet 12852 feet 8764 feet Size 20" i3-3/8" 9-5/8" 7" Plugs (measured) Junk (measured) Cemented Measureddepth ~ueverticaldepth 1800# Poly il4' 114' 300 sx & 400 sx 2521' 2521' 500 sx & 300 sx 12201' 8446' 350 sx 11898-12888' 8295-8781' Pedorationdepth: measured 12626-12642'; 12642-12670' truevertical 8658-8668'; 8668-8685' ~bing(size, grade, and measureddepth) 4½", 12.6#, L-80 @ 11961' MD PackersandSSSV(typeandmeasumdde~h) Baker SB-3 Packer @ 11844' MD 13. Attachments Description summary of proposal __ ; ! CEIVED .... ~ch0mge Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: AnT~] i. 1989 16. IT proposal was verbally approved Oil ..~ Gas ~ Suspended I Name of approver Date approved Service 17. I hereby certify that the f,.,oreg.,oing is true and correct to the best of my knowledge. Signed //¢~~///~~ Ti"eOperations Engineerin~ Manager Date ' "- FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness {Approval No. Plug integrity ~ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- -'¢ ¢ _ ,.,~ved Copy ORIGINAL SIGNED BY ::" ''~; ~'~"" '")'"~ Approved byorderoftheCommissioner LONNIE C. SMITH Commissioner Date / ~-.~2'~~c97~' Form 10-403 Rev06/15/88 SUBMIT IN TRIPLICATE _// WELLS3/96 D. M. Fife, 263-4278 G 4 2 CO~LED TUBING UNIT BOP EGU ! PIqE m 1. 5000 PSi ?" W£LLH[.AD CONNECTOR FLA~G£ 2. 5000 PSI 4 1/16" PiPE RA~S 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. ~)00 PSi 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX HIREL]NE BOP EOUIPHENT 1. 5000 PSI ?" W£LLHEAI:) CC)NN£CIOR FLANGE 2. 5000 PSt WlRELIN£ RAIaS (VARIABLE SIZE) 3. ~OOO PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF Well 4-22 Coiled Tubing Unit Cement Squeeze Application For Sundry Approvals Objective: through a cement channel. Perform a CTU cement squeeze to eliminate excess gas production 1. Make a slickline tag run to verify the PBTD. 2. RIH with CT. Wash the perforations with full strength mud acid. Flow well to produce out all the acid. 3. RIH with coiled tubing and fluid pack the wellbore with filtered seawater. 4. Pump 40 bbls of cement followed by 2 bbls of water and 80 bbls of contaminant. Hold 1500 psi surface squeeze pressure for 60 minutes. Squeeze off the following perforations: Zone Perforations SPF (Ref.: CNL 1-23-86) I 12642-12670 4 5. Jet or reverse out the contaminated cement. 6. Perforate as follows: Zone Perforations SPF (Ref.: CNL 1-23-86) I 12626~12642 LSD Contingency Reperf * I 12642-12670 FSD Reperf If well is unable to flow following reperforation of 12642'-12670' this interval will be reperforated. 7. Test the well. Other Well Information: Current status: Shut-in. Expected static bottomhole pressure: 3780 psi. @ 8800' SS Expected fluid in wellbore at reperforation: seawater. f'..... ~ . Oil & Gas Cons. Commlafiou ~choragle ARCO Alaska, Inc. Prudhoe Bay ~.ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 4, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Approval No. 7-326 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 4-22)W1-3 detailing work per- Mf!r.,~ 0 ? !" ~..~ ~iaska Oil & Gas Cons. Commiss~o~ Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR38--6132-C STATE OF ALASKA ~-". ALAL _, OIL AND GAS CONSERVATION COIV,..SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, TllN, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM At effective depth At total depth 1176' FNI',, 64' FEL, Sec. 22, TllN, R15E, UM 5. Datum elevation (DF or KB) 60' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Approval number 7-326 9. APl number 50-- 029-21454 10. Pool Prudhoe Bay Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 12893 feet 8783 feet Effective depth: measured 12852 feet true vertical 8764 feet Casing Length Size Structural Conductor 114 ' 20" Surface 2521 ' 13-3/8" Intermediate Production 12201 ' 9-5/8" Liner 990' 7" Perforation depth: measured 12642-12670' true vertical 8664-8677' Tubing (size, grade and measured depth) 4½", 12.6~, L-80 @ 11961' MD Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11844' MD Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth 1800 # Poly 114' 300 Sx & 4005 Sx 2521' 114' 2521' 500 Sx & 300 Sx 350 Sx 12201' 11898-12888' 8446' 8295-8781' 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure :-, ,~,-',.- 0il & G~S Cons. An(:h,,)rage 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1000 17,000 0 -- Well shut-in, unable to flow. ~bing Pressure 1750 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~~.~.,,-~ ,~=.¢_~,,.~¢/¢ Title Operations Engineering Manager Form 10-404 Rev. 12-1-8~ELLS/57 T. A. Billingsley, 265-6871 Date Submit in Duplicate 7/4/87 7/10/87 7/24/87 DS 4-22 COILED TUBING UNIT CEMENT SQUEEZE GAS SHUTOFF Shot squeeze perforations: Ref. CNL 1/23/86 12612-12616' 6 spf Pumped 30 bbls cement with additives through coiled tubing. Obtained squeeze pressure of 2200 psi and held for 45 minutes. Contaminated cement in wellbore. Jetted out contaminated cement. Shut in well. Perforated: Ref. CNL 1/23/86 12642-12670' 4 spf Shut in well. Well would not flow. WELLS/57 ARCO ALASKA, INC, P.O. BOX t~0360 ANCHORAGE, AL. ASKA 995~0 DATE' 2-~6-88 REFERENCE' ARCO CA~ED HOLE FINAl._ ~ -4 t -22-88 t -t5 t -22-8R t-t6 t-2~ -88 t -2J 4 -2~-88 ~ -25 ~ -~4-88~ 4-7 2-4-88 4-~ 8 2-~-88 ~4'.22~ ~ -29-88 7- t 3 2-5-88 9-~4 t -25-88 45-~ ~-24-88 ~ J-5 ~ -2~-8~ ~ 5-~ T ~ -25-88 t 5-28 ~ -~-88~ ~ 4-22 t -27-88 t 6-2 ~ -25-88 ~6-5 ~ -28-88 ~ 6-~ ~ 2-~-88 t 6-t 9 t -28-88 ~ 6-28 ~ -29-88 t7-2 t -~ -88 ~ 7-8 ~ -~.5-88 t T-t 8 ~ -25-88 PR.PRFLE/FM/TP/FD/W RUN FLOWMETER PRD~PRFLE/FM/TP/FD/W RUN PRD.,F'RFLE/HF'FM/T~MF'/DEN RI. IN PRD~PRFI_.E/HPFM/TEMP/DEN/WH!.IT RUN PITE/TEMF' RI. IN F'IT$/GR/TEMP RI.IN PITS R~IN F'IT~/TEMP RIJN F'IT~ RUN FI_OWMETER RI.IN PITS/TEMP RtlN PRD~F'RFLE/HPFM/WHLIT RI]N PRO.PRFk. E/HPFM/WHUT/~R RIlN GAMMA RAY RUN PRO . F'RFk. E/HPFM RUN PRO . F'RFLE/$F'I N/TEMP/WHUT RUN INJ. F'RFLE/FM/TP RUN INJ.PRFLE/HPFM/TEMP RUN F'~T~/TEMF' RUN PRODUCTION PROFILE RUN PRO.F'RFL. E/SPIN/TEMP/GR/WHUT RUN F'RD~F'RFLE/HPFM/GR/WHUT RUN INJ~F'RFkE/HPFM RUN INd.PRFLE/HPFM RUN F'LEA~F SIGN AND RETIJR~ TH~TTACHED COPY A~ RF~,~.F'T OF DATA PEGGY BENNE'~ ......... ~chomg~ ATO-i529 TRAN~ ~88185 APPROVED DI~TRIBllTION CENTRAl_. FILES · PHII_I._IP~ CHEVRON PB WELL FTLE~ D & M R h D EXTENSION EXF'L. ORATION ~ ~ ~AF'C EXXON ~ ~ ~TATE OF ALASKA MARATHON . ~ TEXACO MOBIl_ CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO ARCO AI_A.~KA, TN£. ANCHORAGE, ALASKA DATE: 2-~6-RR REFERENCE: ARCO C --~-~-28-88 -88 ~-25-88 ASED HOLE FINAl. PR,PRFI...E/FM/TP/FD/W FI OWMETER PRO. PRFLE/FM/TP/FD/W PRO., PRF[. E/HPFM/TFMF'/DFN PRO,PRFL. E/HPFM/TEMP/DEN/WHI.IT P.T T,~/TEMP PIT,.~/GR/TEMP FLOWMETER F~ IV~,:.i~- PITS/TEHP ~ > ~' "~J RLIN PRO. PRFLE/HPFM ?WHLLTq 0ii & Gas Cons. ComDis::,LRUN F'RD PR,'FL.E/HF'FM/WH[F'~"GR' A~chorage RI_IN GAMMA RAY RUN PRO,'PRFLE/HPFM RUN PRO. PRFLE/.~P IN/TEMF'/WHUT RUN INJ. PRFLE/FH/TP RLIN INJ ~ PRFLE/HPFM/TEMF' RUN P~TS/TEMF' RUN PRODUCTION PROFILE RUN F'RD PRFL. E/EPTM ,~,.r,/~'/~UT RLIN PRO. PRFLE/HPFM/GR/WHUT RLIN INJ. F'RFL E/HPFM RUN INJ.PRFLE/HPFH RUN CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCn CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAM~O CAMCO HAVE A NICE DAY~ ..... ............. . D ~ M R ~ D , EXTEN,~ION EXPL. ORATION ~ ~AF'C ~ ~~ , ~ EXXON MARATHON ~ TEX~CO ' / / ~ MOBIL ARCO AI_A$'KA, T. NC P. 0. BOX ANCHORAGE, AI...A£K A DATE · REFERENC 995~0 2-'16-t.FI8 "- d~ -..-.- E: ARCO CA.TED HOLE FINAl. ~ -t 9 't -?O-SR t -23 t -2G-88 t -23 t -24-8~ 4-7 2-4-88 4-t ~ 4-22 t -29-88 7- t 3 2-5-88 9-34 ~ -25-88 f t - t 3-t t -24-88 t ~-5 ~ -23-8R t S-~ 7 t -2~-88 I 5-28. t4-22 t -27-88 ~ 6-2 t -25-88 I 6-5 t -28-88 t 6-~ 9 2-t -88 t 6-1 9 t -28-88 ~ 6-2~ t -29-88 t 7-2 t -~1 -88 I 7-8 t -25-88 { 7-f ~ t -25-88 PLEASE SI RECEIVED HAVE ANI PR ,. PRFI...E/FM/TP/FD/W Ft. OWMETER PRD,, PRFLE/FM/TP/FD/W PRD., F'RFL E/HPFM./TFMF'/DEN PRD,PRFI_.E/HPFM/TEMP/I)EN/WHIIT PIT.~/TEMF' P IT..~/F.,R/TEMP PIT,~ F' I T,.~/TEMF' P I T,,~ FLOWMETER PIT,~/TEMP PRD ,, PRFLE/HPFM/WHLIT F'RD, PRFL. E/HF'FM/WHtlT GAMMA RAY F'RD, F'RFL. E/HPFH PRD , F'RFLE/$P I N/TEMF'/WHt.IT IN,.J ~ F'RFLE/FM/TP I NJ , PRFLE/HPFM/TEMF' PITS/TEMF' F'RODUCTION PROFILE F'RD, F'RFI...E/,_~F' I N/TEMF'/G R/WHUT F'RD ,, F'RFLE/HF'FM/GR/WHUT I NJ., F'RFL E/HPFM INJ, PRFLE/HF'FM . ~_'.. _~.S. '~-, ~ ........ RI.IN t , 5 RIIN t, ~; RI.IN ~ , 5 RI. IN t , ~ RI.IN ~, 5 RI. IN RI.IN 9, .~' RI. IN 7, % RI.IN t, ..% R'IIN RI.IN I, 5 R'LIN E'I.JN t, 5 RI. IN t, 5 RUN t , 5 RtJN t, _~' RUN ~i , 5 RLIN t, 5 RI.IN ~, 5 RI. IN t, 5 RUN RLIN 'l, .%'. R'.t. IN t , 5 RUN t, 5 RUN I , 5 RECEIF'T OF DATA RAMCO CAMCO RAMCO RAMCO RAM£O CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PEGGY BENNETT ATO-1 TRAN,~ $88 APPROVED DISTRIBLITION CENTRAl_ FIt_EX CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL ""-,- PHI I_.1._ I P,S" PF~ WELt.. FTI..F..Y R & D ¢ S'AF'F: .,,."'STATE OF ALASKA ~- TEXACO ARCO Alaska, Inc. Prudhoe Bay ~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 20, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Approval No. 7-326 & 7-594 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMV/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 4-22)W1-3 WELLS2/51 ARCO Alaska, inc. is a Subsidiary of At~anticRichlieldCompany AR3B--6132-C STATE OF ALASKA .... ~ ALAS . OIL AND GAS CONSERVATION COM~,..SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate l~ Plugging [] Perforate ~ Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 60' RKB Feet 3. Address P. O. Box 100360: Anchorage: AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, TllN, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM At effective depth At total depth 1176' FNL: 64' FEL; Sec. 22; TllN: RlSE; UM 11. Present well condition summary Total depth: measured 12893 feet true vertical 8783 feet Plugs (measured) 6. Unit or Property name Prudhoe BOy Uni~ 7. Well number 4-22 8. Approval number 7-326 & 7-59/, 9. APl number 50-- 079__2 !A5~. 10. Pool Prudhoe Bay 0il Pool Effective depth: measured 12852 feet true vertical feet 8764 Casing Length Size Structural Conductor 114' Surface 2521 ' Production 12201' Liner 990' Perforation depth: measured Junk (measured) Cemented 20" 1800# Poly 13-3/8" 300 + 4005 Sx 9-5/8" 500 + 300 Sx 7" 350 $x Measured depth True Vertical depth 114' 114' 2521' 2521' 12201' 8446' 11898-12888' 8295-8781' 12642-12670' true vertical 8662-8676' Tubing (size, grade and measured depth) 4~", 12.6#, L-80 @ 11961' MD Packers and SSSV(type and measured depth) Baker SB-3 packer @ 11844' MD; Camco Bal-0 SSSV @ 2181' MD 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure -- SI .... 750 5184 14 Tubing Pressure 750 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] Signed ~~~/~ Title Operations Engineering Manager Date Form 10-404 Rev. 1~S2/51 JMV/TAB Submit in Duplicate DRILL SITE 4-22 COILED TUBING UNIT CEMENT SQUEEZE GAS SHUT-OFF 7/4/87: 7/10-11/87: 7/24/87: Shot squeeze perforations: 12612-12616' MD 6 spf Ref: CNL 1/23/86 Pumped 30 bbls cement with additives through coiled tubing. Maintained squeeze pressure of 4800 psi BHP for 45 minutes. Attempted to pump contaminant but too viscous. Diluted contam- inant with water and pumped contaminant into cement in well- bore. Jetted out contaminated cement immediately because of questionable contaminant. Reperforated: 12642-12670' MD 4 spf Ref: CNL 1/23/86 Unable to flow. TAB2/06 DS 4-22 STIMULATION PROCEDURE ARCO Alaska Inc. performed the following stimulation on December 3, 1987: 1. MIRU pump trucks, transports, CTU, and N2 unit. 2. RIH w/CT. Fluid packed the CT/production tubing annulus to top of perforations. 3. Stimulated the well as follows: A. 2000 gals of 12% HCI w/10% EGMBE B. 2300 gals of 12% HCI/1.5% HF acid C. 2300 gals of 2% NH4CI water w/10% EGMBE Displaced stimulation fluids from the CT with diesel. 4. Lifted the well w/crude nitrified w/300 SFC/STB. 5. POH w/CT. 6. RD and released equipment. 7. Obtained a valid well test. Anchorage, Alaska DATE: tt-9-87 REFERENCE: ARCO Cased Hole Final. t -:3 9-.5-87 Co I I a r t-7 8-22-87 Co l la t-t t 7-t t-87 Co[ l~r t-t2 7-t t-87 Co l t-2~ ?-t t-87 Col 2-t 2 7-22-87 Co I. tar 4-22 7-24-87 Co 5-4 8-2t -87 Co I. 5-I 3 7-26-87 Co Ilar 5-t 7 9-23-87 Vmrt i I 6-7 7-t 2-87 Co [lar 7-t t 7-t e-87 Co I, I. ar 9-2 t ~-t 5-87 C~ 9-34 8-2i -87 Co t t-26 7-3t-87 t t-27 6-22-87 Co I. I. ar ~ t-27 7-3t ~R7 Co Ilar t2-~ 7-~ e-~7 Col Jar t 2-t 5 ~-2-87 Co I. I. ar 1 3-t 8-3t -87 Co t3-t4 8-t7-87 Col (Perfnraf ion log) (Perforation Log) (Pet-forafion Log) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation Log) (Pe)'forafi~n Log) (Perforation Log) (Perforation (Perforation Log) (Perfnration [.og) (Perforation Log) (Perforation Log) (Perforation Log). (Perforation I..og) (Perforation Log) (Per for a t i on I...og ) (P~rforation Log) PLease ztgn and return ~bhe a_*,ta~-.~ed copy as ret. atp v ........ ~ch0mge Peggy Bennett ~TO-t 52~ TRAN$ ~876e& /~ Approved BISTRIBLITION Run R~Ln Run R~n R~D R~D Run R'~D Run RN~ Run Ru.D RND RND t, t, t, t, t, t, t, i, t, t, t, t, t, i, t, t, t, f da 5' 5" 5" 5' 5' 5' .5' 5' 5' 5" 5' 5' 5" 5" 5' i:a ,'> ". Atlas Afl. as AT la.~ Afl. as AT la.~ At I.a.~ AT la..~ At I.a.~ Af la..~ At l.a.~ At I.a~ At la.~ At las A~ I. ag At la.~ At I.a~ At la.~ ~t I.a~ Central. Fi le~ Chevron D&M Ex ten.~ i on Exploration Exxon M~ra ~hon Mob i I. Phi I. I. i p..w PB Well Fi le,~ SAPC 2tare of. AI, aska,~ Texaco ARCO Alaska, In/'"' ~' Prudhoe B,.,. Engineering Post Office Box 100360 AnchOrage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 3, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Permit No. 84-233 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMV/jp Attachment cc: Standard Alaska Production Company Pi(DS 4-22)W1-3 RECEIVED S£P 0 9 ~7 Alaska 0ii & Gas Cons. C0mrnissi0n Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C /---. STATE OF ALASKA ALA ,A OIL AND GAS CONSERVATION CO~..,ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] [] Plugging [] Stimulate~ Pull tubing [] Amend order [] Perforate [] Other [] Time extension Change approved program 2. Name of Operator ARCO Alaska, Thc 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1089' FSL, 217' Fkrb, Sec. 26, TllN, R15E, U~ At top of productive interval 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM At effective depth 5. Datum elevation (DF or KB) 60' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Permit number 85-233 9. APl number 50-- 029-21454 feet 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 12893 feet 8783 feet Plugs (measured) Effective depth: measured true vertical 12852 feet 8764 feet Junk (measured) Casing Length Structural Conductor 114 ' Surface 2521 ' Size 20" 13-3/8" Cemented Measured depth True Vertical depth 1800 # Poly 114' 300 Sx & 4005 Sx 2521' 114' 2521' Intermediate Production 12201 ' Liner 990' 9-5/8" 7" 500 Sx & 300 Sx 350 Sx 12201' 11898-12888' 8446' 8295-8781' Perforation depth: measured 12642-12670' true vertical 8662-8676' ~bing(size, grade and measured depth) 4~" 12 6# L-80 @ 11961' MD 2 ~ · , Packers and ~SS¥(typ~ and measured depth) Ba~er SB-3 ~ac~er ~ 11844' MD 12.Attachments Description summary of proposal [] SEP 0 9 Alask,-z 0it & Gas Cons. commission Anchorage Detailed operations program ~ BOP sketch [] 13. Estimated date for commencing operation .- September 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify th, st the foregoing is true and correct to the best of my knowledge Signed ~/~./x/~//~~-,~ Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by I Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI .....~~%'-' by order of Commissioner the commission Form 10-403 Rev 12-1-85 -., WELLS/57 J. M. Vitucci, ATO-1508, 265-6358 ~ ~t~~ Submit in triplicat(¢~..~-- DRILL SITE 4-22 SELECTIVE STIMULATION PROCEDURE · 1 w = . , = 1 = Obtain a valid well test. MI and RU pump trucks, transports, N2 unit, and CTU. RIH with CTU to 12750' MD. Displace rathole fluid with 8 bbls of 9.3 ppg 2% NH4CI water. Pull up CTU to 12550' MD. Fluid pack the coil-production tubing annulus. Run down with CTU to 12640' MD and pump the following fluids: A. 1000 gals of 2% NH4CI water B. 1700 gals of 12% HCI w/additives C. 2240 gals of 12% HCI - 1.5% HF w/additives D. 2240 gals of 2% NH4CI water E. 1000 gals of diesel w/10% EGMBE Displace stimulation fluids from the coil tubing with crude nitrified w/500 SCF/bbl. Begin lifting the well with N2 immediately following the displacement stage. Continue N2 lifting the well until the well begins to flow by itself. POH with coil tubing replacing volume with crude. RD and release equipment. Obtain a valid well test. 5 4 3 2 I 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PS! 4 1/16" PIPE RAMS ,3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 9 ~..~ 1 Cons. ....... f'- STATE OF ALASKA '~- ~ · ALASKa' OIL AND GAS CONSERVATION L;OMMISSION ~ ~ 1. Status of Well Classification of Service Well y REVISED OIL EX GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21454 4. Location of well at surface " 9. Unit or Lease Name 1089' FSL, 217' FWL, 5ec.26, T11N, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1716' FNL, 82' FEL, 5ec.22, T11N, R15E, UM 4-22 At Total Depth 11. Field and Pool 1176' FNL, 64' FEL, Sec.22, T11N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 60'I ADL 28322 ALK 2320 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions'1 10/27/85 11/23/85 12/01/85'I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 12893'MD, 8783'TVD 12852'MD, 8764'TVD YES~] NO []I 2181 ' feet MD 1850' (approx) 22. Type Electric or Other Logs Run CET, CNL, GCT, CBL/CCL/GR, CR/CET/CNL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD ~: IAMOUNTPULLED 20" ~1.~ H-u,O Surf 114' 30" 1800# Polyurethane 13-3/8" 68.0/72.0# K-55/L-80 Surf 2521' 17-1/2" 3000 sx CS Ill & 400 sx CS II 9-5/8" 47.0# L-80 Surf 12201' 12-1/4" 500 sx Class G & 300 s;~ CS I 7" 29.0# L-80 11898' 12888' 8-1/2" 350 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 11961 ' 11844 ' 12626 ' -1 2670 ' 8658 ' -8685 ' 4 spf 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED See attached StimJlation Summary dated 11/11/86 for stimulation data 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 07/21/86I F1 owl ng Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 08/01/86 3.2 TEST PERIOD I~ 21.2 69 0 75°I 3231 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 217 10 24-HOUR RATE ® 159 514 0 27° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED AUG i 0 19~7 Alaska 0il & Bas Cons. O0mmissi0~.] A~ch0rage *Note: Tubing was run & the well completed 1/26/86. Perforated well 6/5/86. WELL COMPLETION OR RECOMPLETION REPORT AND LOG Form 10~,07 WC3/25 :DAN I Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate GEOLOGIC MARINERS ~- F'(~F~MATION TESTS . - . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. . Top Sad1 erochi t 1227z~ ~ 8b, 82 ~ N/A Base Sadlerochit 1269b,~ . 8688~ G0C 1258~ ~ 86~ ~ ; . . 3t. klST_OF ATTACHMENTS Stimulation 5u~ar~ (dated 11/11/86) . 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ . . Signed ~ ~~ ~,,/,~ Title AS 5oc, a~e Eng, neeF 'Date ~'~-~.7 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item '1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item-24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Drill Site 4-22 Selective Stimulation Summary 11/11/86 1. MI & RU pump trucks, N2 unit and transports. Stimulated well as follows: a. 2500 gal of 15% HCl w/additives and atomized w/600 SCF/BBL of N_. b. 5000 gal of 6% HC1 - 1%% HF w/additives and atomized w/600 SCF~BBL of N . c. 2~00 gal of diesel w/5% EGMBE and atomized w/600 SCF/BBL of N2. i. 120 bbls of dead crude atomized w/600 SCF/BBL of N2. RD & released equipment and returned well to production immediately. e RE£EIVEI) AJas~ Oil & Gas Cons. OommissioT~ ARCO A[a.~km, Inc~ DATE' Jul. y ~4, ~987 REFEI~ENCE: ARCO Cased HoLe F'inaL 2-t6 ?-6-8? CCL &Perf. Rec, Run :3, 5' S-24 7-6-87 CET Run :~, .5' 4-22 7-4-87 2,~, Perf. Rec. Run ~, 5' 9-3 7-7-87 CET Run 2, 5' ~'c h 2ch 2c h .~:,.. h Pi. ease sign and return the at~ac:hed copy ms receipt of data, Received By HAVE A NICE DAY! Ro.sa nne Peek A'¥O-- t .529 TRAN2 ~87S6~ Ap p roved ............. Anchorage D I $ TR :1: BIJT :[ ON A~RCO Alaska, Inc/ ~' Prudhoe Bay .~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager May 12, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Permit No. 8S-233 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company Pi(DS 4-22)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany '"'-" STATE OF ALASKA "-- ALAS,,..~ OIL AND GAS CONSERVATION COM .... ,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ,~ Other 2. Name of Operator ARCO Alaska, ]:nc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, TllN, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM At effective depth At total depth 1176' FN~, 64' FEL, Sec. 22, TllN, R15E, UM Pr~ 5. Datum elevation (DF or KB) 60' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Permitnumber 85-233 9. APInu'mber 50-- 029-21454 10. Pool tdho& Bay Oil Pool feet 11. Present well condition summary Total depth: measured true vertical 12893 feet 8783 feet Effective depth: measured 12852 feet true vertical 8764 feet Casing Length Size Structural Conductor 114 ' 20" Surface 2521 ' 13-3/8" Intermediate Production 12201 ' 9-5/8" Liner 990' 7" Perforation depth: measured 12626-12670' true vertical 8658-8685' Tubing (size, grade and measured depth) 4½", 12.6#, L-80 @ 11961' MD Packers and SSSV (type and measured depth) Baker SB-3 Packer @ 11844' MD Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth 1800 # Poly 114' 300 Sx & 400 Sx 2521' 114' 2521' 500 Sx & 300 Sx 350 Sx 12201' 11898-12888' 8446' 8295-8781' 12.Attachments Description summary of proposal I~ Detailed operations program [] BOP sketch 13. Estimated date for commencing operation 5/1/87 14. If proposal was verbally approved Name of approver Date approved 15. I hereby c~rtify that/~he~ore,~oing is true and correct to the best of my knowledge _/~//¢¢¢~///~~///2/////./ Title Operations Engineering Manager Signed Commission Use Only Date Conditions of approval Commissioner Approved by !;¥ ~'~'!-~ ~' ~":'~>" Form 10-403 Rev 12-1-85 ~.T .T..q / c~ 7 Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test .,~.Location clearancel l' ~ by order of the commission Date Submit in triplicate DS 4-22 CTU CEMENT SQUEEZE GAS SHUT-OFF PRELIMINARY PROCEDURE 1. Shoot squeeze perfs 12612-12616. Ref: CNL 1/23/86 2. Flow well prior to moving on location to ensure channel is open. 3. RIH with CT. Tag PBTD and locate tubing tail. 4. Fluid pack wellbore with 500 bbls water. 5. With CT at PBTD, start laying in cement. Pump 20 bbls cement. 6. Pressure up on the squeeze to 5000 BHP and hold for 45 minutes. 7. GIH and contaminate cement in wellbore while slowly bleeding wellhead pressure to maintain a minimum of 200 psi differential into the formation. 8. WOC a minimum of 12 hours before jetting out contaminated cement. 9. Wait a minimum of one week. Reperforate the following interval: 12642-12670' 4 spf Ref: CNL 1/23/86 10. Begin producing well. Evaluate productivity and GOR before adding upper perfs. 11. Reperforate the following upper interval pending production tests from lower interval: 12626-12642' 4 spf Ref: CNL 1/23/86 TAB/82 6 5 4 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE 2. 5000 PSI 4 1/16" PIPE RAMS ,.3.5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX CO I LEO TUB I N~ UN ] T BOP EQU I PMENT i i , , jl 1. 5000 PSI '7" W£LLHEAD CONNECIOR FLANG[ 2. 5000 PSI ~IR£LINE RAMS (VARI&13L[ SIZ[) :5. 5000 PSI ~ 1/6" L UI3RICA'I'OR 4, 5000 PSI 4 1/6" FLOW 'I'UB£ P^CK-Orr 2 N 1REL I NE BOP E0U I PFIENT -- ii m · i i ARCO Alasl<a, t~.~:..~ P.O. Box t0(>36~? Anchormge, ALaska. 995~6 DATE' February 2 5, i987 REFERENCE' ARCO Ca~ed Hole Fin@l 3-i4 8-23-86 CET Run t, 5' Sch 4-i7 6-6-86 Perf. Record Run t, 5' Sch 4-i8 6-6-86 Perf. & CCL Run t , 5' $ch 4-2t 6-ii-86 F'erf~ & CCL Run i, 5' $ch 4-22 6-5-86 Perf. Record Run t, 5' Sch ~' Sch 4-24 6-6-86 Perf. Record Run i, ~ 4-~7 6-4-86 F'erf~ Record Run i, 5' Sch 4-28 6-4-86 Perf. Record Run i, 5' Sch 9-i~ ~ 8-7-86 CET Run i, ~' Sch t4-4 8-i4-86 Reperf. Record Run i, 5' Sch i6-24 8-2i-86 Perf. Record Run i, 5' Sch iT-ii 5-it-86 CompLe*ion Record Run l, 5' ~ch iT-i4 8-29-86 Add-F'erf. Record Run i, 5' Sch F'lea~e ~ign and re,urn ,he a~ached copy aS receip~ of da,a. ATO-I 529 ~ Ai~ska 0il & Gas Con~ ~mmission ~ ~ ~ Anchorage TRANS ~87~27 ~/ / ';~; ~RIBUTION -".,-Phi LLip£ F'B Wel. L Fi Le~ R & D :,,-...~%.. St a ~e' of. A [a~ka-~- ~ Texaco F:' ... 0 ~ ;5: c:~ ::,': i 0 E:: ?3 ,'-5 0 i:;: ,:.:-:, (:: ,:..'-? i v' ,:.-.'.:, d i{-i-:.' y .............................................................................. .'..-' ! ,,:'.' .::- .2. ARCO Alaska, Inc. Prudhoe Bay ,..ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 6, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-22 Permit No. 85-233 Dear Mr. Chatterton: Attached is the "Subsequent" the above-referenced well. Sundry Notice detailing work performed on Very truly yours, D. F. Scheve DFS/WWP/jp At t a chment CC: Standard Alaska Production Company Pi (DS 4-22)W5-4 R£C£1V£D Alaska Oil & Gas Coi~s C°mrnission Anchorage WELLS/43 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~-'" STATE OF ALASKA ALAS .... OIL AND GAS CONSERVATION COMN,,,~SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate.~ Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 60' RKB Feet 3. Address P. O. Box 100360~ Anchorage, AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, TllN, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM At effective depth At total depth 1176' FNL, 64' FEL~ Sec. 22~ TllN~ R15E~ UM 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Approval number 85-?33 9. APl number 50-- 029-21 454 10. Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12893 feet Plugs (measured) feet 8783 12852 feet Junk (measured) feet 8764 Casing Length Size Cemented Measured depth Structural Conductor 114 ' 20" 2000# Poly 114 ' Surface 2521' 13-3/8" 300 Sx & 300 Sx 2521' Intermediate Production 12201' 9-5/8" 500 Sx & 300 $x 12201' Liner 990' 7" 350 Sx 12888' Perforation depth: measured 12626-12670' MD true vertical 8655-8676' TVD Tubing (size, grade and measured depth) 4½", 12.6#, L-80 @ 11961' Packers and SSSV(type and measured depth) Baker Model SB-3 Packer @ 11844'; Camco Bal-0 SSSV nipple @ 2181 Prudhoe Bay Oil Pool 12. Stimulation or cement squeeze summary ~ue Verticaldepth 114' 2521' 8546' 8781' All Intervals treated (measured) Treatment description including volumes used and final pressure See attached 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl .o o 0 Casing Pressure Tubing Pressure O 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge s, n.d Form 10-404 Rev. 12-1-85 Title Operations Engineering Manager Submit in Duplicate Drill Site 4-22 Selective Stimulation Summary . MI & RU pump trucks, N2 unit and transports. Stimulated well as follows: Be Ce 2500 gal of 15% HC1 w/additives and atomized w/600 SCF/BBL of 5000 gal of 6% HC1 - 1½% HF w/additives and atomized w/600 SCF~BBL of N . 2~00 gal of diesel w/5% EGMBE and atomized w/600 SCF/BBL of N2. 120 bbls of dead crude atomized w/600 SCF/BBL of N2. RD & released equipment and returned well to production immediately. P 0 Box ~ '0("~ ''~6() A'n c h o r ,.'..', g e, A l a .s' k a ,-) DATE' I)ecember ~-.. S, q986 R E F:' E R E N C Ii!: ' A 17 C 0 C a s'e d I-.I o I. (-'-., I::' i n a I. C a m c: o ,i'.:; c h .'S' c I"J X c I", P I. ea:.=;e .s i gn and re!'urn 't'he a !"l:a(::l"~e,:J copy as' rece i l::,'t' o'f' da't'a .~ D I J.-.' 'f' R 'J: B U 7' ! 0 i'-.J. · "¢ C'e'n'l:ra I. F:'i Les' ~"~,. I-: h e ;,/I" o i~ _ D & M :',~: E x t: e n_'-; i o n E x p L o r a t: i c,'n '"' E X :4 ~'"~ 1] -ii- M a r a '( h o 'n .11. -.- i'iob i I. ~: F'hi I. L i l:'S' F:'B WeL I. F:'i le2: F,'.: & D ~" 5: r', h i r; ~ ;!-.-':-I:a'l.'e o'f" A l.a.s-I<a '"' l"e x a c: ,"; November 13,~1986~' . ALASKA OIL AND GAS CONSERVATION COMMISSION / /' 3001 PORCUPINE DRIVE / - . ~' .'"'' Telecopy No. (907) 276-7542 . · · . .. , . · .. . ;... = ADMINISTRATIVE APPROVAL NO. 213.5 Re: Unit (PBU)~wells 4-22 and 4-28. Mr. D. F. Scheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK- 99510-0360 WaiVer to rule 11 of Conservation Order .165 for Prudhoe Bay Dear Mr. Scheve: .' - 4- You have requested waivers to rule'lla'of C.O. 165 for PBU wells. 4-22 and 4-28 bM Application for Sundry Approvals dated Novem- ber 5, 1986. -~ - ,~ '" .- ., .These wells are producing from less than 30 feet of perforations. In eaCh case the perforations are contained in a single zone. Therefore a productivity profile is not necessary to determine well flow from different zones.· . The Commission hereby approves your request to waive the pro- duction profile required by rule lla of C.O. 165 in PBU.wells 4-22 and 4-28. Sincerely, ' Commissioner BY ORDER OF THE COMMISSION dlf/3.AA213.5 . . · ~"~ STATE OF ALASKA ALAS .... OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 5. Datum elevation (DF or KB) 2. Name of Operator ARCO Alaska, ]]nc. 3. Address Post Office Box 100360, Anchorage. AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, UM At effective depth 1212' FNL, 65' FEL, Sec. 22, T11N, R15E, UM At total depth 1176' FNL, 64' FEL, Sec. 22, T11N, R15E, UM 11. Present well condition summary Total depth: measured 12893 feet true vertical 8783 feet Plugs (measured) 60' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Permit number 85-233 9. APl number 5o-029-21454 10. Pool Prudhoe Bay Oil Pool Effective depth: measured 12852 feet true vertical 8764 feet Casing Length Size Structural Conductor 114' 20" Surface 2521' 13-3/8" Intermediate Production 12201' 9-5/8" Liner 990' 7" Perforation depth: measured true vertical 12636'-12670' Junk (measured) Cemented Measured depth True Vertical depth 1800# Polyurethane 114' ]14' 3400 SX 2521' 2498' 500 SX 12201' 8446' 350 SX 11898'-12888' 8791' 8658'-8685' ~bing(size, grade and measured depth) 4~" 12 6#, L-80 @ 11961'MD Packers and SSSV (type and measured depth) Baker GBH-22 @ 11844'N~CAMCO BAL-O SSSV @ 2181' 12.Attachments RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Description summary of proposal I~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation November 20~ 1986 14. If proposal was verbally approved Name of approver Date approved 15' I hereb~"~ertify~t.~ th~/'~r~'~, ing ~s true and c°rrect t° the best °f mY kn°wledge~ Signed ,~~~~~ Title0perations Engineering Manager Commission Use Only Date Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved by Form 10-403 Rev 12-1-85 Commissioner IApproval No. by order of the commission Date Submit in triplicate In accordance with Conservation Order No. 213, ARCO Alaska, Inc. requests the following' · Permission to run a static bottomhole pressure survey on Well 4-22, in lieu of a pressure transient test prescribed in Conservation Order 165, Rule 6B. Well 4-22 has been shut in since June due to low flow. The static bottomhole pressure survey should provide an accurate measurement of reservoir pressure. · Permission to waive the production profile prescribed in Conservation Order 165, Rule 11a. Only 27' of perforations were shot in 4-22. All of the perforations were shot in Zone 1 thereby negating the need for a spinner survey. Additional perforations in Zone I are planned. The timing of the perforations, however, is after the initial six month time period has passed. A production profile will be run subsequent to the additional Zone I perforations. Anchomr.,le STATE OF ALASKA -- ALASk, OIL AND GAS CONSERVATION COMI~.__,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing ~ Time extension ~ Change approved program [] Plugging [] Stimulate ~ Pull tubing ~' Amend order ~ Perforate ~ Other 2. Name of Operator 5. Datum elevation (DF 'or KB) ARCO Alaska, Inc. 60' RKB feet 3. Address 6. Unit o_r Prop_erty name P. O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location " 1089 At top of 1716' 'FNL, 82' FEI,, Sec. 22, TllN, R15E, UM At effective depth of well at surface ' FSL, 217' FW-L, Sec. 26, TllN, R15E, UM productive interval At total depth 1176' FNL, 64' FEI,, Sec. 22, TllN, R15E, UM 7. Well number 4-22 8. Permitnumber 85-233 9. APInumber 50-- 029-21454 10. POOl Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 12893 feet Plugs (measured) 8783 feet Effective depth: measured true vertical 12852 feet Junk (measured) 8764 feet Casing Length Structural Conductor 114 ' Surface 2521 ' Intermediate Production 12201 ' Liner 990 ' Perforation depth: measured Size Cemented Measured depth 20" 1800# Polyurethane 114' 13-3/8"/300 sx CS 111 & 400 sx CS 11/2521' 9-5/8"/500 sx C1 "G" & 300 sx CS 1/12201' 7" 350 sx C1 "G" 12888' 12626-12670' MD true vertical 8655-8676' TVD ~bing(size, grade and measured depth) 4-1/2", 12.6#, L-80 at 11961' Packers and SSSV(type and measured depth) Baker Model ~B-3 Packer at 11844'~ 12.Attachments Description summary of proposal True Vertical depth 114' 2521' 8546' 8781' ..."?, 0 6 Careen B~I-D ~V n~ppl¢, mt 2181' Detailed operations program .r-;, BOP sketch 13. Estimated date for commencing operation November 1, 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed _,---~~ .~,~r' ~,~-~-¢.,.~ Title Operations Engineerin~ Manager Commission Use Only Date Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative may witness ~ Plug integrity ~ BOP Test ~ Location clearance Commissioner [ Approval No. ¢¢~C:~ by order of the commission Date/~-~" ~'- t:~ Submit in triplicate Drill Site 4-22 Selective Stimulation Preliminary Procedure le me e MI & RU pump trucks, N2 unit and transports. Titrate acid and test iron content as follows: HC1 should be 13.5% to 17.5% with an Fe content of less than 300 ppm HC1-HF should be 1.2% to 2.0% HF; 5.5% to 7.0% HC1 with an Fe content of less than 300 ppm Stimulate well as follows: a) 2000 gal of 15% HC1 w/additives and atomized w/300 SCF/BBL of N~. b) 4000 gal of 6% HCl - 1½% HF w/additives and atomized w/300 SCF/~BL of N . c) 1~00 gal of diesel w/10% EGMBE and atomized w/300 SCF/BBL of N . d) Displace to formation with dead crude atomized w/300 SCF/BBL o~ N2 Volume of hole to top of perforations: 217 bbls Volume of hole to bottom of perforations: 218 bbls All fluid except and crude displacement should be filtered to 2 microns. RD & release equipment and return well to production immediately. Test well for new capacity. WWP3/40 STATE OF ALASKA ~--- ALAS,,,-, OIL AND GAS CONSERVATION COM,,..JSION. REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address Post Office Box 100360, Anchorage, AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, UM At effective depth 1212' FNL, 65' FEL, Sec. 22, T11N, R15E, UM At total depth 1176' FNL~ 64' FEL~ Sec. 22, T11N, R15E, UM 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 114 ' Surface 2521' Intermediate Production 12201' Liner 990' Perforation depth: measured true vertical Plugging Perforate ~ Pull tubing [] 5. Datum elevation (DF or KB) 60' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-22 8. Approval number 126 9. APl number 50-- 029-21454 10. Pool Prudhoe Bay 0il Pool Feet 12893 feet 8783 feet 12852 feet 8764 feet Plugs (measured) Junk (measured) Size Cemented 20" Measured depth 1800# Polyurethane 13-3/8" 3400 SX True Vertical depth 12636'-12670' 8658' -8685' Tubing (size. grade and measured depth) 4-~" 12 6# L-80 @ 11961'MD 2 , · , Packers and SSSV (type and measured depth) Baker GBH-22 @ 11844'~CAMC0 BAL-O SSgV @ 2181'NtD 12. Stimulation or cement squeeze summary Not Applicable Intervals treated (measured) Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 0 159 514 0 10 Tubing Pressure 0 217 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ¢-'/~,~ ~-"< ~ /-'~,,~ Signed ~~~_ .~~--/____~-~_.~ Title Operations Engineering Manager Date ~///</,/.o-~ Form 10-404 Rev. 12-1-85 JGA (263-4361) Submit in Duplicate 9-5/8" 500 SX 12201' 8446' 7" 350 SX 11898'-12888' 8791' 114' 114' 2521' 2498' SUMMARY OF OPERATIONS Began Perforating operations on 6/5/86. RU perforating unit, pressure tested equipment. RIH w/gun #1, shot intervals 12650'-12670'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH w/ gun #2 shot intervals 12626'-12650'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. Secured well, RD. Put well on production 7/21/86. Depths referenced to CH-CNL 1/23/86. STATE OF ALASKA ALASKA.'IL AND GAS cONSERVATION C..,~MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7..Permit Number ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-21454 4. Location of well at surface 9. Unit or Lease Name , 1089' FSL, 217' FWL, Sec. 26, TllN, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1716' FNL, 82' FEL, Sec. 22, TllN, R15E, UM 4-22 At Total Depth 11. Field and Pool 1176' FNL, 64' FEL, Sec. 22, TllN, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 60' RKB] ADL 28322 ALK 2320 12. Date Spudded 13. DateT.D. Reached 14. Date Comp., Susp. orAband. ,15. Water Depth, ifoffshore 116. No. of Completions 10/27/85 11/23/85 12/01/85J IN/A feet MSL 1 17. Total Depth (MD+TVD} 18.Plug Back Depth (MD+TVD} 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 12893'MD, 8783'TVD 12852'MD, 8764'TVD YES]~ NO [] 2181 feet MDI 1850' (Approx.) 22. Type Electric or Other Logs Run CET~ CNL~ GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5~ H-40 Surf ' 114 ' 30" 1800# Polvur~th~n~ 13-3/8" 68.0#/72.0~ K-55/L-80 Surf. 2521' 17%" 3000 sx CS 111 & 400 sx CS 11 9-5/8" 47.0# L-80 Surf. 12201' 12~z" 500 sx Clas~ "G" & 300 .~× CS l 7" 29.0# L-80 11898' 12888, 8¥' 350 sx Class G · 24. Perforations open to Production (MD+TvD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4~ l 1961 ' 11 R/~ ' 12626'-12670', 8658'-8685' 4 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED ~/A 27. PRODUCTION TEST ' Date First Production I MethOd of Operation'(Flowing, gas lift, etc.) 7- 21- 86I Flowing Date of Test HoUrs Tested PRODUCTION FOR OILiBBL GAS-MCF WATER-BBL CHOKE SIZE IGAs'OILRATIO 8-1-86 3.2 TEST PERIOD ~ 21.2 69 0 75°] ~2~1 . Flow Tubing Casing Pressure CALCULATED oIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 217 10 24-HOUR RATE ~ 159 514 0 2.7° 28. CORE DATA Brief description of lithoiogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED AUG 1 8 1986 / · Ajas~ka 0il & Gas Cons. Commission Anchora0e Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .... GEOLOGIc MARI~E'R~ ' ' . '- .;";.'.' ::!'- , -':~ ~ :: :.:, .: .... ~'i:ORMATI'ON TESTS ";'.' ' i' :: ; ~ t ./ '~,,- - ¢: . ~ ~ ,.: - :-~ ~:' :.. ,: ....... . , ~. . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 12274' 8482 ' Base Sadlerochit ~!2694' 8688 ' G~ .. 12583' 8634' . . . . . . . 31. LIST OF ATTACHMENTS 32. I hereby certify that the fb'regoing is true and correct to ~h~ best of my' En6wledge ~ · ~er. Engr. Mgr. Si~ned Title ~ate o... INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska'. Item 1' Classification of Service Wells: Ga~ injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing tl~e data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method o'f Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO ALaska0 Inc. F'.O. Box 100360 Anchorage, ALaska DATE:JuLy tO ,t986 REFERENCE: --4-2t '--' 4-22 ~-t 3-3 ----t 3-4 --'--43-t2 -"'-~ 3-27 -"t4-3 ~4-5 ~t 4-7 ~4-9 ~5-~ ~ ~5-t3 ARCO F're~$ure Data 6-t5-86 Static Gradient Camco 6-t6-86 Static Gradient Camco 6-26-86 Static Gradient Camco 6-26-86 Static Gradient Camco 6-29-86 Static Gradient Camco 6-27-86 Static Gradient Camco 6-23-86 Static Gradient Camco 5-27-86 Static Gradient Camco 6-30-86 Static Gradient Camco 6-27-86 Static Gradient Camco 6-29-86 Static Gradient Camco 6-29-86 Static Gradient Camco 6-3e-86 Static Gradient Camco 6-3~-86 Static Gradient Camco PLease sign and r/~~~ached Copy as receipt of data. HAVE A HI--AY! '-'- ' ~-bO~;~;~ '--~ Linda HuLce ATO-tS~9.. TRANS ~86424 DISTRIBUTION Central Fi Les Chevron - D &M Ex~,en~ion ExpLoration '"-.- Exxon Marathon ~ Mob i [ PhiLLips F'B WeLL Fi Les R & D. Soh i o ;State of ALaska Texaco ,-"- STATE OF ALASKA ~"- ALASt OIL AND GAS CONSERVATION COMIc. SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing ~ Time extension .%.' Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~ Amend order © Perforate ~i~ Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 60' RKB feet 3. Address Post Office Box 100360, Anchorage. AK 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec. 26, T11N, R15E, LM At top of productive interval 1716' FNL, 82' FEL, Sec. 22, T11N, R15E, LM At effective depth 1212' FNL, 65' FEL, Sec. 22, T11N, R15E, LM At total depth 1176' FNL, 64' FEL? Sec. 22, T11N, R15E, UM 11. Present well condition summary Total depth: measured 12893 true vertical 8783 Effective depth: measured 12852 true vertical 8764 feet Plugs (measured) feet feet Junk (measured) feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 8. Permit number 85-?33 9. APl number 50-- fl2g-?1454 10. Pool Prudhoe Bay 0il Pool Casing Structural Conductor 114' Surface 2521' Intermediate Production 12201' Liner 990' Perforation depth: measured Length Size 20" 13-3/8" 9-5/8" 7" true vertical I~)NE Tubing (size, grade and measured depth) 4½" 12.6~ L-80 Packers and SSSV (type and measured depth) Bakc. r GBH-22 fa 11844' CAM(f) RA!-41 .%gV fa 21~1 12.Attachments Description summary of proposal Cemented Measured depth True Vertical depth 1800# polyurethane 114' 114' 3400 SX 2521' 2498' 500SX 3~ SX 12201' 8446' 11898'-12888' 8791' RECEIVED MAY 2 7 1986 Alaska Oil & Gas Cons. 6ommission Anchorage Detailed operations program ~ BOP sketch C 13. Estimated date for commencing operation June 1, 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby/~ertify th~/t~e ~reg~.ng is;rue and correct to the best of my knowledge Signed ~11~~ ~ ~ Title Operations Enqineering Manager Commission Use Only Conditions of approval Notify commission So representative may witness I Approval ~ Plug integrity © BOP Test ~ Location clearance I Approved by Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate ARCO Alaska, Inc. proposes to perforate DS 4-~'2~ at selected intervals within the Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be flowed for clean-up. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Ref- CH-CNL 1/23/86 Proposed Perforation Intervals- 12626'-12670' R 'CEiVED MAY 2 7 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc· · F'.O. Box t00360 Anchorage, A[aska 995~0 DATE' March ti, t986 REFERENCE' ARCO Magnei~ic Tapes w/[isling ~D$ 4-t7 2-t 7-86 ~D$ 4-~ 8 2-8-86 O/H O/H ~2~7 4-22 ~-25-86 CH CNL1 Run t DA ~'ch Please sign and re~urn ~he a~fached copy as receipf of dafa. Received By.. __ : :'_ '~" HA~E A NICE DAY~ .... -.~ ~: ~ . Irma Ca,~[in ATO-~ 429F TRANS ~86288 DISTRIBUTION CentraL Fi Les ~.PhiLLip~ ' ' , Chevron F'B WeLL Fi Les D&M R &D Extension Exp [ora~. ion ~ Sohio Exxon ~ ~tate of ALaska Maratho~ Texaco Mob i [ ARCO Alaska, Inc. /--" Post Office B~,, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 12!5 February 24, 1986 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 4-22 Dear Mr. Chatterton' Enclosed are the Well Completion Report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Si ncerely, Gruber Associate Engineer JG/tw GRU13/L155 Enclosures RECEIVED ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA U,- AND GAS CONSERVATION CO~v,~vllSSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~XX GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-21454 4. Location of well at surface 9. Unit or Lease Name 1089' FSL, 217' FWL, Sec.26, T11N, R15E, UM '[['~'/~i' Prudhoe Bay Unit / -- At Top Producing Interval [ VERIFIED 10. Well Number 1716' FNL, 82' FEL, Sec.22, TllN, R15E, UM !Surf. ~ 4-22 AtTotal Depth if).H._ ~ 11. Fieldand Pool 1176' FNL, 64' FEL, Sec.22, TllN, R15E, UM .... 'z Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) ] 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 60' RKBI ADL 28322 ALK 2320 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore I16' No. of Completions 10/27/85 11/23/85 1 2/01/85*I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 12893 'MD ,8783 'TVD 12852'MD,8764'TVD YES D~[ NO []I 2181 feet MD 1850' (approx) 22. Type Electric or Other Logs Run CET, CNL, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91 .5# H-40 Surf 114' 30" 1800# Polyurethane 13-3/8" 72.0#/68.)# L-80/K-l;5 Surf 2521' 17-1/2" 3000 sx CS Ill & 400 ,~x CS II 9-5/8" 47.0# L-80 Surf 12201' 12-1/4" 500 sx Class G & 300 ,,x CS I 7" 29.0 L-80 11898' 12888' 8-1/2" 350 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2" 11,961 ' 11 ~844' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE [GAS-OILRATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE "Ir 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECE VFD FEB 2 8 1986 AladOl 01t & Gas Form 10-407 * NOTE: Tubing was run 1/26/86. DAM/WC31 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIc MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRuE VERT. DEPTH GOR, and time of each phase. Top Sadl eroch i t 1 2,274 ' 8482 ' N/A Base Sadl erochit 12,694' 8688' G0C 1 2,583' 8634 ' · , · 31. LIST OF ATTACHMENTS Well History (completion details), Gyroscopic Survey (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge . Signed ~ ~ ~~ Associate Engineer _ Title Date i INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this fo-rm and in any attachments. Item 16 and 24: If this well is completed for separate production.from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item-!23.'., A~ttacht~Q. S~pplemental records for this well should show the details of any multiple stage cement- ing 'and the iocat'ioh'df the cementing tool. Item 27' Me~hOd ~f Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jecti ~on, Gas Injection, S~ut-in, Other-explain. Item 28:":l~:h~r-'c~res taken, indicate "none". Form 10-407 ARCO Oil and Gas Company 4~, Well History- Initial Report- Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or worl(over operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District Alaska Field Prudhoe Bay Auth. or W,O. no. AFE 803979 County, parish or borough North Slope Borough L .... or Unit ADL t/28322 T t e Completion State Alaska Iw0" °.22 WWS #1 API 50-029-21454 Operator ARCO Alaska, Inc. SpuddedorW.O. begun JDate j,ou~ Complete 1/20/86 Date and depth as of 8:00 a.m. 1/21/86 1/22/86 1/23/86 1/24/86 Complete record for each day reported ARCO W.,. 21.66% Pr or status if a W.O. 0800 Hrs. 7" @ 12,888' 12,582' PBTD, RIH w/DP 9.4 ppg NaC1 Accept ri~ @ 0800 hrss 1/20/86. tbg hgr. PU BHA & DP, RIH. ND tree, NU & tst BOPE, pull 7" @ 12,888' 12,582' PBTD, RIH 9.4 ppg NaC1 RIH w/bit & csg scrprs, tag lnr top @ 11,885' POH. PU 6" bit & RIH. , rev circ hole, 7" @ 12,888'. 12,582' PBTD, POH 9.4 ppg NaC1 Tst csg & lnr. Rev circ, cln & filter brine, POH. 7" @ 12,888' 12,582' PBTD, RIH 9.4 ppg NaC1 RU Schl, tst lubr. f/12,785'-2,434'. w/wrk string. Rn CET f/12,813'-11,746'. Rn GCT gyro f/12,740'-surf. Rn CNL RD Schl. RIH RECEIVED FEB 2 8 1986 Alaska 0il & 6as Cons. [;ommlssi0n Anchorage The above is correct Signature~/,~ For form preparation and distriJj~Jtion, see Procedures Manual, Sectiol~ 10, Drilling, Pages 86 and 87. JDate 2/11/86 JTitle Drilling Superintendent ARCO Oil and Gas Company Daily Well History-Final Report fnstruclions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned. or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an o~ficial test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporling the entire operation if space is available. Accounting cost center code District lCounty or Parish State Alaska J North Slope Borough Alaska Field IL ...... Unit I Well no. Prudhoe Bay ADL #28322 4-22 Auth. or W.O. no. JTitle AFE 803979 I Completion WWS #1 API 50-029-21454 Operator ~ A.R.Co. W.I. ARCO Alaska, Inc. I 21.66% Spudded or W.O~ begun JDate Complete I 1 / 20/86 Date and depth as of 8:00 a.m. Complete record for each day reported Iotal number of wells (active or inactive) on this ost center prior to plugging and I bandonment of this well I our ~ Prior slatus if a W.O. 0800 Hrs. Old TD Released rig 1200 Hrs. 7" @ 12,888' 12,837' PBTD, RR 9.4 ppg NaC1 RIH. to PBTD, POH, LD DP. Chg rams & tst. RU & rn 4½" tbg. Set pkr. Tst tbg & ann. PU & shear ring in seal assy. Re-tst tbg & ann. Set BPV. ND BOPE, NU & tst tree. Att to circ fluid thru contrl balance ins w/o success. ND lower tree & tbg spool adapter, repl same. NU & tst BOPE. Shear out ball. Instl BPV. RR @ 1200 hrs, 1/26/86. 1/25/86 thru 1/27/86 SSSV @ 2181', SB-3 Pkr @ 11,844', TT @ 11,961' Classifications (oil. gas, etc.) Oil Producing method RECEIVED FEB 2 8 1986 Naska 011 & Gas Cons. ~mmlsslon Anchorage New TD I PB Depth 12,893' 12,837' JDate ]Kind of rig 1/26/86 Rotary Type completion (single, dual. etc.) Single Official reservoir name(s) Flowing S adlerochit Potential tesl data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day 'Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected Th~ ~hnw i~ cnrr~t Signature For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. IDate ITitle 2/11/86 Drilling Superintendent $UB.$URFACE DIRECTIONAL URVEY [~]UIDANCE ~]ONTINUOUS ~-~'] OOL RECEIVED FEB 2 8 ]gB6 AJaska 0il & G~s Cu.s. Commission Anchorage Company Well Name Field/Location ARCO ALASKA INCORPORATED- T,TELL OS 4-22 (1089' FSL, 217' F~,~, S26, TllF.l ,R15E) PRUDHOE BAY, NORTH SLOPE I ALASI<A Job Reference No. 71263 Logc~ed By.' BARBA Date 12-~EB-1986 ComDut~l BE CUDNEY $CT OI~ECTI3N~L SU~EY CUSTOMER LISTIN3 FOR ~RC3 ~L~SK~, INS. DS PRU]H~E NORTH SLOPE,AL~SK~ SUR~E¥ D&TE: 2~-J~N-95 METHD]S O~ C2MPUT~TIO~ TDOL L3C~TI3N: TAN~ENTIAL- INTERP3LATION: LINEAR VERTICAL S~CTI3N: HORIZo 2IST. ENGINEER: B~RB~ AVER&GE2 DE¢iATION ~,Z I M~JTH PROJECTED gqTO ~ T&qGET AZIMUTH OF NORTt 1 DES 31 MIN ~EST ARSg ~LAS~A, I~C. DS 4-22 PRJDHDE B~Y ND~TH SLDPE,AL&SK~ COMPUTATION DATE: 1Z-FEB-B5 INTERPOLATED V~L'JES FDR EVEN 100 FEET TRUE SJB-S=A ME&SURE2 VERTI'~L VERTI'AL DEPTH DEPTfl DEPTH 0.03 O.O0 'qO.O0 100.00 ( 0.02 200.00 ~O0.DD 300.D0 ~00.00 400.00 500.00 500.00 500.03 500.00 730.03 700.00 300.00 800.00 930.00 899.99 10.90.00 1 t 00. O0 1200.00 1300.39 1~00.00 1500.00 1500.00 1700.00 1800.00 1900.00 30 03 00 00 O0 00 O0 OD O0 03 39 O0 03 O0 03 33 00 999.99 1099.99 1199.99 1299.99 1399.08 1499.98 1599.97 1699.96 1799.B5 1899.~6 1998.75 2097.21 219~,~7 2290. ~+6 Z385.09 2478, '45 2571.32 2662.34 2750.01 2835.58 Z920.13 3006-21 3088-29 3170.88 3248.12 3322,20 3393.12 3461.29 3525.71 3585.59 2030. 2; "0. 2~00. 2500. 25{)0. 2700. Z ~O.O. 2900. 3000. 3130. 3200. 3300. 3~,00. 3500. 3500. 3700. 3300. 3900. ME~SURE -60.00 40.00 142.00 240.00 340.00 440.00 540.00 540.00 740.00 839.99 C3JRSE VERTICAL DOSCEG REST~N ]EVI{TI3N AZIMJTq SECTION SEVERITY NORTH! lEG MIN DEG MI~ FEET DE3/IOD FEE 939.99 1039.99 1139.99 1239.99 1339.98 1439.98 1539.97 1539.95 1739.85 183'~.45 0 0 N O O E O.O0 0.03 0 9 S 9 47 E -O.1B 0.07 0 5 N 53 8 W -0.38 0.59 0 7 S 5 13 E -3.59 1.4~ 0 I1 S ~4 ZZ ~4 -3.80 0.70 0 14 S 3~. 30 E -1.15 1.24 0 15 S 15 23 E -1.45 1.55 0 7 N 11 34 W -1.66 2.6'3 0 11 S 4 4~ W -1.78 1.28 0 15 N 89 29 E -1.89 1.02 1938.75 2037.21 213~.47 .2230.46 2325.09 241B.45 2511.32 2602.34 2590.01 2775.68 0 15 N 55 5 E -1.94 0.56 0 16 N 83 55 E -1.94 0.9~ 0 23 S 75 8 E -1.94 0.59 0 30 S 75 15 E -2.06 3.9~ 0 33 S 82 30 E -2.20 3.25 0 34 S 6~ 13 5 -2.43 0.57 0 .52 S 51 15 E -3.12 9.31 I 12 N 77 57 E -3.70 2.0~+ 3 ~7 N q. 6 43 E -1.44 2.57 5 55 N 23 55 E 5.49 3.25 2860.13 2946-21 3028.29 3110.88 3189.12 3262.20 3333.12 3401.29 3465.71 3525.69 8 15 N 0 35 F. 17.03 4.23 11 ~8 N 0 5¢ E 34.42 3.94 14 54 N 8 11 E 57.46 3.68 17 39 N 10 38 E 84.72 3.59 20 Z N B 32 E 115.43 3.23 21 _~2 N' 5 57 E 151.84 0.25 22 50 N 3 39 E 188.58 ~.07 26 ~Z N 5 53 W 229.91 5.95 30 22 N 3 23 W 277.57 1.89 31 50 N' 7 28 W 328.77 2.15 D~TE DF SJR~EY: KELLY 5USHIN~ ELEVATION: ENGINEER: B~RBA 1 53 .OD FT 32 36 N % 53 W 382.13 1.09 32 %9 N 3 29 W 435.22 3.70 32 59 N 2 4% W 490.33 1.31 36 53 q Z 39 W 546.66 7.31 40 58 N ~ 7 W $10.09 2.22 43 27 N 4 2~+ W 577.18 2.41 46 0 fl 3 13 W 747.59 Z.69 48 23 N 2 39 ;4 :120.72 3.15 51 32 N 2 17 W 897.18 3.69 54 19 N 2 15 W 977.18 2.69 DEPTH SULAR CD3RDIt~TES SOUTH E~ST/WEST T r'EET D.DO N O.DO E 0.17 S 0.09 E 0.37 S 0.16 E 0.59 S 0.1) E 0.80 S 0.07 E 1.15 S 0.15 E 1.~4 S 0.20 E 1.55 S 0.3~ E 1.77 S 3.40 E 1.88 S 0.51 E 1.~1 S 0.91 E 1.91 S 1.35 E 1.89 S 1.94 E 1.99 S 2.75 E 2.10 S 3.59 E 2.31 S 4.67 E 2.97 S 5.59 E 3.51 S 7.15 E 1.16 S 10.53 E 5.91 N 15.70 E 17.51 N 17.61 E 34.89 N 17.35 E 5'7.99 N 19.29 E 85.~1 N 2~.95 E 117.27 N 30.19 E 152.82 ~ 3~.61 E 189.57 N '38.61 E 231.00 N 38.05 E 278.~9 N 30.7~ E 329.50 N 23.13 E 382.73 N 17.41 E $36.73 N 13.5~ E ~90.78 N 10.62 E 547.37 N ~.22 E 510.42 N 4.32 E 577.~0 N 0.76 W 747.70 N 5.71 W 820.77 N 9.24 W ~97.17 !~ 12.53 W ~77.11 N 15.67 W HDRIZ. DIST. FEET O.O0 0.20 0.~+1 0.50 O.gO 1.16 1.~5 1.59 1.B1 1.98 2.12 2.34 2.71 3.39 4.24 5.21 6.42 7.95 10.69 15.78 26.83 38.97 61.12 8~.98 121.10 156.59 193.56 234.11 280.18 330.31 383.12 ~36.9~ 547.13 510.~4 577,~0 747.72 320.82 897.25 977.2~ DE>~RTJ~E ~ZIMUTH DES MIN 3 0 E 27 15 E 23 56 E 12 10 E 5 9 = 716= 3 5 E S 13 6 : S 1Z 43 E S 17 56 E S 25 32 E S 35 22 E S 45 38 E S 5¢ 3 : $ 63 zo S 63 ~2 E S 5Z 25 E S 63 50 E S 83 46 E h~ 69 22 E 2 36 E 1 46 E 1145 3 51 E D 24 E 0 3 ,~ 0 26 W 0 38 4 3 55 W A~CO aL~SK&, INC. DS 4-22 PRJDHgE BaY NDRTH SLO~E,AL~SK& CO~PUTATIDN T ME~SURE3 VER DEPTH D 4000.00 36 ~DO.O0 37 ~O0.OO 38 4500.00 38 45D0.00 39 4530.00 39 4?00.00 50 4BDO.DO 41 5000.03 5190.0~ 5Z00.00 5300.03 55~0,D3 5500.00 5700.03 5800.00 5900.00 6000.00 $7 .. OD ~9 6500.00 50 6500.00, 50 6500.00 51 6700.00 52 6~O0.OO 52 5gDO.OD 53 7390.93 53 7100,03 54 7ZOO,OD 55 7300,00 55 7500,00 56 7500.00 56 7500.00 57 7700.00 57 7800.00 58 7930.39 59 D~TE: 1Z-FEB-85 INTERPOLATED VALdES FOR EVEN 100 FEET O: CDJRSE VERTICAL DOGLEG 3EVI~TIDN AZIMUTq SECTION SEVERITY DEG 4IN DEG MIN FEET DES/IOO RUE SJB-SEA TIC&L VERTICAL EPTq DEPTH 54 33 N 1 52 W 1058.69 0.55 54 57 N I 22 W 1150.36 55 17 q O 53 W 1222,34 3,75 55 37 N 3 41 W 1304.74 3.40 55 $0 N O 3~ W 1387.42 1.85 53 ~9 N 3 29 W 1458.87 0.85 54 15 N 3 19 W 15~9.67 1.23 53 58 N $ 30 W 1533.88 2.23 53 59 N 5 13 W 1711.49 0.62 54 22 q $ 5~ W 1792.38 D.OZ 43.51 3583.61 01.32 3541.32 58.58 3698.58 15.23 3755.23 71.47 3811.47 29.45 3869.45 88.29 3929.29 ¢6.57 3985.57 05,53 4045,53 54,11 $104,11 54 38 N 4 33 W 1873.65 0.41 55 3 N 4 3 W 1955.33 3.75 55 Z5 N 3 ~3 W 2037.45 0.75 55 18 N 3 3 W 2119.74 0.80 56 18 N Z ~0 W 2202.$2 0.40 56 32 N 2 ~ W 2285.71 0.85 56 ~7 N 2 2 W 2359.3~ 1.15 55 ~8 N 1 5g W ~45Z,41 3.48 56 7 N 1 39 W 2535.29 1.04 54 54 N 2 12 W 2617.67 0,9~ 22.t9 $162.19 79.73 $219.73 36.11 ~275.71 93.55 $333.45 49.51 $389.51 59.73 4499.73 15.$7 $555.47 71,$3 $611.43 28.11 ~56B.11 54 15 N 1 55 W 2599.20 1.20 52 52 · N 2 31 W 2779.61 3.91 52 27 N I 25 W 2858.97 3.61 53 2 N 3 35 W Z938.47 1.55 51 56 N 3 27 W 3017.68 0.85 51 54 N $ ~1 W 3096.18 O.3g 52 50 N $ 3 W 3175.14 0.63 52 13 N 3 23 W 3255.43 1,1g 53 50 N 2 55 W 3333.92 3.27 54 17 N Z 4 W 3415.40 1.90 86.00 $725,00 45.43 ~785.43 05.27 ~845.27 66.~0 ~905.90 27.86 $96?.86 89.70 5029.70 50.~4 5093.94 11.79 5151.79 72.~2 5212.42 30.37 5270.37 54 ? N 1 1Z W 3495.40 3.45 54 35 N O 33 W 3577.77 1.37 54 15 N 3 20 W 3558.90 2.45 53 ~8 N 3 51 W 3739.74 3.71 53 ~8 N $ 20 W 3820.35 O.6g 53 %9 N 4 24 W 3901.01 " 0.28 54 !5 N 3 58 W 5981.77 D.45 55 18 N 2 58 W $063.44 1.4~ 55 21 N 2 1 W $145.77 0.61 55 17 N 1 23 W 5228.14 3.47 89.01 5329.01 47,t3 5387.13 05.55 5445.55 54.38 5504.38 23.$2 5553.42 82.40 5522.40 41.26 5581.26 98.88 5738.88 55,53 5795,63 12.32 5852.32 ~GE D~TE DF SUR~EY: Z$-J~N-B5 KELLY BUSHIng ELE¢~TI3N: ENGINEER: 34RBA 2 53.00 FY ME~SURE2 O:OTH RECTENSULaR CgDRDiNATES HDRIZ. NORTH/SOUTH E~ST/WEST DIST. :SET FEET FEET 1058.57 N 18.55 W 1058.74 1140.20 N 20.93 W 1140.;0 1122.17 N ZZ.60 W 1222.38 1304.57 ~ 23.7) W 1304.79 1387.25 ~ 25.59 W 1387.47 1568.65 N 27.65 W 1%68,91 1549.35 N 32.60 W 1549.70 1530.~5 N 37.55 W 1530.89 1710.90 N 44.90 W 1711.$9 17'91.53 N 5Z.OB W 1792.38 1372.75 N 58.81 W 1373.67 1955.30 N 65.00 W 1955.38 2036,29 N 70.67 W 2037.51 2118.$8 q 75.55 W 2119.83 2201.18 N 79.68 W 2202,62 2284.31 N 83.15 W 2285.83 2367.94 N 86.17 W 2369.51 2550.31 N 89.18 W 2552.53 2533.75 N 91.74 W 2535.41 2516.08 q 95.71 W 2517.79 2597.56 N 97.57 W 25'99.32 2777.91 N 100.89 W 2779.74 2957.23 N 103.52 W 2859.10 2935.58 N 105.69 W 2938.61 3315.78 q' lll.?B W 3317.85 3394.15 N 117.52 W 3096.38 3172.~8 N 123-57 W 3175.39 3252.16 N 123.75 W 3Z54.71 3331.56 N 133.03 W 3334.22 3512.97 N 135.81 W 3~15.71 3493.94 N 138.92 W 3595.70 3575.31 N 140.24 W 3578.06 3556.$6 ~i' 140.30 W 3559.15 3737.24 i 153.58 W 3740.00 3317.74 q 149.43 W 3820.57 3898.25 'N 155.75 W 3901.35 3978.88 ~ 161.59 W 3~82.16 $060.$4 N 165.74 W 4063.87 4142,71 N 170.19 W 4146.21 4225.05, ~ 172.57 W 4228.58 DEP&RTURE 4ZlMUTH DES MIN N 1 0 W t 1 3 W '~ 1 3 W q 1 2 N '4 1 O W '~ 1 4 W ~ 1 1Z ,~ q 1 19 W ~ 1 30 W N 1 39 ~ N 1 47 W N 1 59 W N Z 4 ~ ~i 2 5 W q Z 5 4 2 4 4 2 4 W 2 4 ~ 2 4 W 2 7 ~ 13 '~ 16 ~ 2174 2 17 N N Z 16 W ~ 2 14 W N Z 12 W 2 14 W 2 17 W 2 19 W 2 21 W 2 21 W 2 20 W ARCO ALASKA, INC. DS 4-2Z P:~ JDH3E B~Y NDRTH SLOPE, ~,LI~SK~, CDMPJT&TIDN DATE: 1Z-FEB-SS DaTE 3F SgRVEY: 24-J~N-$5 (ELLY BUSHING ELEIATIgN: ENGINEER: B~RB4 3 53.00 FT ME~SUR DEPT 8000. 8%00. 8530. 8500. 8?00. 8~DO. 8~30. 9030. 9100. 9200. 9300. 9~00. 9530. 9500. 9700. 9~00. 9~00. 10000. O. 1 . .,~ 0 . 10400. 10530, 10500. 10700. 10~30. lOgO0. llOOO. 11130. 11230. 11300. 11~00. 1150-0. 11500. 11700. 11~00. 11~00. INT:qPOLaTED VALJES FOR TRUE SJB-SEA ED VERTICAL VE~TI'AL H DEPTH DEPTH CDJRSE ]EVI~TIg~ AZIMUTH ]EG ~IN DEG MIN O0 5968.7~ 5908.74 O0 502~.03 5954.03 OD 5079.40 5019.40 O0 5134.71 5074.71 OD 5192.73 5132.73 O0 5252.56 5192.56 00 5312.59 5252.69 OD 5373.00 5313.00 30 5433.13 5373.13 OD 5492,~7 5432.87 56 7 N 5 15 56 38 N 5 2 56 14 N 5 0 56 1 N 5 3 53 16 N 3 ~3 53 18 N 3 33 52 46 N 3 55 52 59 N 3 43 53 7 N 3 33 53 33 N 3 33 O0 ~551.~5 5491.95 OD 6610.%7 5553.47 O0 5668.98 5608.98 00 5727.13 5557.13 OD 57~.~5 572~.95 O0 58~3.~1 5783.~1 O0 5901.~1 5841.41 O0 5958,92 5893,92 O0 7015.91 5955,91 00 7074,15 7014,15 53 58 N 3 3~. 54 3 N 3 20 54 12 N 3 19 54 38 N 3 11 54 32 N 3 1 9 54 9 N 3 11 54 ~5 N 2 45 55 tO N 2 23 54 59 N 1 28 53 57 N D 41 O0 7133.99 7073,99 O0 7194.96 7134.95 OD 7255,89 7195,89 O0 7317.53 7257.53 30 7379.'~5 7319.95 OD , 7442.71 738Z,71 O0 7504. :93 '7444.93 03 7566.42. 7505,42. 33 762:7.44 7557,44 O0 7687,~3 7~7.93 52 33 52 24 52 18 51 36 51 11 51 Z2 52: 18 52 38 N 0 3 N 0 41 N 0 5 N 3 51 N I 43 N 212 N 2 37 N 25? N :> 53 OD 7747.78 7587,78 O0 7807.23 7747.23 O0 7857.Z1 7807.21 OD 792,8.31 7863,31 O0 7989,23 792~.23 OD 8049.79 7989.79 O0 8111.73 8051,73 OD 8175.51 6115.61 00 8238,~5 ~178.45 03 8296.~9 ~235.89 53 53 52 52 52 52 5O 50 52 55 26 23 ~2 9 39 3O 58 3 39 50 311 227 1 8 1 5 O 52 3 3? 0 30 0 5 I 3 EVEN 100 FEET 0= ME&SURE V:RTICAL DSG_EG RE'TAN SECTION SEV:RITY NSRTH! FEET DES/IOD FEE %310,64 Z.42 4307. %393,73 3,23 4390, %475,73 1,lB 4~73, %559,83 Z,01 4556, %641.16 0.71 4537. ~721.24 0.3~ %717. %801,08 0,37 ~776, ~880.78 0'33 ~376. %960.63 3.53 4~56. 50~0.77 0.50 5336, 5121,42 1,49 5116. 5202.45 0,23 5197, 5283.50 3,51 5278, 536~.82 3.10 5359. 5~46.3? 0.45 5~41. 5527,48 0,99 5522, 5603,90 D,91 5503, 5590,69 1.25 5585, 5772.87 1,23 5767. 5954.15 0.95 5848. 5934,23 0,87 5~29, 5013,46 0,22 5008, 5092.69 3,90 5087, 5171.42 0.97 5165. 5249.55 0.73 6244. 5327,41 3,93 5322, 5405.58 0.94 5~00, 5484,52 3.47 5%79. 5563,72 0.95 6553. 5643.33 1.37 5537. 5723.39 O.Sg 5717, 5503,79 1,62 5?98, 5883,79 1,OB 5878, 595Z.94 3,35 5~57. 7042.25 0.4~ 7336. 7121.83 1.61 7116, ?200.32 1.57 7194. 7277,24 0.63 7271. 7355,00 3,28 7349. 7435.07 3.75 7~30. DEPTH SOUTH E T ~6 N 1 35 N 1 15 '~ 1 06 N Z 26 N 2 23 N 2 95 N 2 5C N 2 29 q 2 33 N 2 O3R AST FEE 77. 85 · 94, 02, OB, 13, 19, 24. 29, 34. DILATES HDRIZ. /NEST DIST, T FEET 19 W 4311,10 72 W 4394.27 57 W 4477.37 55 W 4560,55 75 W 4541.95 80 W 4722.07 Ol W 4901,95 38 W 4~81.70 ~2 W 4)61.59 39 W 5041.78 DEPARTURE aZIMUTH DES N 2 21 W N Z 25 W q 2 29 W 2 3".~ ~ '~ Z 35 W N 2 36 ~ q Z 3~ ~ ~ Z 39 W N Z 39 W 87 N 239.40 W 5122.'66 BO N 244,33 W 5203,54 q Z 41 W 75 N 249.05 W 5284.52 98 N 253,60 W 5365.97 ~3 N 258,30 W 5~47,56 ~5 ~ 262.88 W 5528,70 78 ~ 267,22 W 5510.15 q 2 43 W 50 N 270.92 W 5591.95 N 2 43 54 N 273.54 W 5774.13 91 N 275.15 W 5B55.38 275,49 W 5935,41 ~ Z 39 N 274,93 W 601~,56 N Z 3'7 ~ 27~,22 W 6093,73 N Z 34 W 274.75 W 6172.42 N 2 33 W 275.51 W 6250,53 N 2 32 W 279.30 W 6328.39 ~ 2 31 W 282,54 W 6405.57 N 2 31 ~ 286.41 W 6485.53 N 2 31 W 290,5~ W 5564,75 ~ 2 32 N 294.73 W 6544.38 N 2 32 ~ Ol N 56 N 30 N 23 N ~4 N 20 N 32 N 8~ N 81 N 13 ~1 10 N 24 ~ 53 N 10 N 50 N 52 '4 3O N %2 N 29 30 30 30 30 31 31 31 31 31 9,13 W 5724,~7 3,31 W 6804,90 5,71 W 588~+,89 7,27 W 6~64,02 8,8~ W 7043.31 0.24 W 7122.86 1,34 W ?201,33 2,0? W ?278,22 2,38 W 7355.~3 1.59 W 7435.95 ~30 ~L~S~, I~C. DS P~JOHDE B~Y NDRTH SLOPE,~LASK~ CDMPUT~TI3N DBTE: 12-mEB-85 DATE OF SURVEY: Z¢-J~-B6 KELLY BUSHING ELEVATION: ENGINEER: 3ARB~ 4 50.00 F1 iNTERPOLATED V~LJES :OR EVEN 100 TRUE SJB-SEA MEASURED VERTICAL VERTI=AL ]EPTH DEPTq DEPTH lZO00.OO 8350.52 8299.52 I?'DO.OO 8398.86 B338.86 ]0.00 ~4~5.30 8385.30 ~30.33 849~.56 3434.56 12~30.03 8545.05 5~85.05 12530.02 8594.90 353~.90 1Z$90.~3 86¢2.99 8582.99 12700,00 ~690.~5 )630.~5 123.D0oDD 8738.54 B678.54 1Z893.00 8783.35 8723.35 C3DRSE VERTICAL ]EVIATI3~ ~ZIMUTH SECTION ]EG lin DES MI/ FEET 59 2~ N 1 67 E 7320.33 62 39 N 2 21 E 7607.68 61 4 ~ Z 33 E 7695.0~ 59 ~8 ~ ~ I E 7782.75 59 ~6 N 3 6 E ?868.72 60 31 N 2 1~ E 7955.17 61 40 N I 29 E ~042.68 61 34 N 0 4~ E ~13D.61 61 11 N } 41 E ~21~.23 $1 11 N ~ ~I E 8299.66 FEET Om MEASURE] DOGLEG RE:T~NS SEVERIT~ N3RTH/S DES/IOD FEET DEPTH UL~R C DUTH E 3.5~ 7514.77 N 3 2.53 7502.24 N 3 3.61 7590.72 N 3 ~.02 7?77.50 N 2 1.52 T~53.74 N 2 1.93 7~50.33 N 2 3.85 B~3T.~5 ~ 2 3.42 8123.~5 ~ 2 O.OD BZ13.$3 ~ 2 g. O3 8Z95.12 N Z D]RD AST! :EET 09.40 06.1~ 02.58 97.53 9Z.O~ 87.95 85.01 83.38 ~Z.32 81.33 Iq~TES W~ST H]RIZ. DIST. l=.'E E T 7521.14 7508.~0 7596.67 7783.28 7369.16 7955.54 8343.00 8130.90 8213.48 8299.89 DE,~RTURE ~ZIMUTH DES MIN 2184 Z 15 W Z 11 4 2 7 ~ 1 W 1 59 4 1584 1 56 W DS 4-22 PRJDH2E B~Y N3RTH SLDPE~AL~SK~k COMPUTATION D/~ TE: 12-FmB-85 D&TE DF SgRVEY: 24-J~N-85 KELLY BUSHING ELEVAT[]N: ENGINEER: B&RB4 INT=RPOL~TEO VALJES FOR EVEN lO0) FEET 3= MEASURED DEPT TRUE SJB-S=~ MEASURED VERTICqL VERTICAL DEPTH DEPTH 3EPTH CDJRSE VERTICAL DOS' EG ]EVIqTIEN &ZIMUTt SECTION SEVERITY ]EG MIN DES ~II mEET DES/lO0 0 0 N O g E 0.00 0 15 N 65 5 E -1.94 3.54 8 15 N 0 35 E 17.03 4.23 32 38 N 4 53 W 382,13 1.09 54 33 N 1 52 W 1058,69 D,55 54 38 N 4 33 W t873.65 3,41 54 15 N 1 55 W 2599.20 1,20 54 7 N 1 12 W 3495.40 0.44 56 7 ~ 5 15 ~ ~310.64 2.42 $3 ~8 N 3 34 W 5121.42 1,45 52 33 N 0 3 E 5934.23 0.87 53 25 N 3 11 W 5723.39 ~.59 59 24 N 1 ~7 E ?520.33 3.56 61 11 N O 41 E 3299.65 O.OO O.OO O.O0 I nO0,OD 999,~9 939.99 ~0.00 1998.75 193~.75 ~.JO.O0 2920.13 2860.13 4330.0D 36~3.51 3583.61 5900.00 ~222,19 4162,19 6gDO.OD ~786.30 1725.00 7000.00 5389.31 5329.01 8000,00 5968,74 5908,74 93DO.g3 6551.~5 5491,95 lO000.O0 7133.99 7073.99 llOO0.OD 7747,78 7687.78 1ZD30.O0 8350.52 8290.52 12893.3D 8783.35 8723,35 5 53.00 FT RE'T~NEUL&R COJROI~4TES H3RIZ. NORTH/SOUTH E~ST/4EST DIST, FEET FEET FEET O.DO N 0.00 E 0.00 1.91 S 0.91 E 2.12 17.51 N 17.61 E 24.83 382.73 N 17.41 E 383.12 1358.57 ~ 18.65 W 1358.74 1~72,75 ~ 53.81 W 1~73,57 2597.56 N 97.57 W 2599.32 3~93.94 N 13~.92 W '3~96.70 ~307.46 ~ 177.19 W ~+311.10 5116.37 N 239.40 W 5122.45 DEm~RTURE ~ZI~U'TH DES MIN ~ 3 0 E S 25 32 E N ~+5 10 E 2 36 E 1 0 N 1 47 N N 2 16 W Z 21W Z 40 ~ 5929.01 N 275.a9 W 5~35.41 N 2 39 W 5717.B1 N 299.13 W 6724.47 ~ 2 33 W 7514.77 N 309.40 W 7521.14 q 2 21 ~ ~295.12 ~ 281.33 W 8299.~9 ~ 1 56 W aR"D aLASKA, IMC. DS 4-22 P2JDHME BaY NgRTH SLDmE,ALaSKA CO~PUTaTI34 D~TE: 12-F:B-85 PaGE )aTE DF SURVEY: Z~-J~N-85 ~ELLY BUSHIN3 ELEVATION: ENGINEER: BalB~ 6 F1 INTE2POL&TED VALJES FOR EVEN 100 FEET OF TRUE SJB-SE~ MEASURED VERTICAL VERTICAL ]~PT4 DEPTH DEPTH 0.30 0.00 -5D.OO 50.03 60.00 O.O0 SO.OD 160.00 100.00 _50.00 260.30 203.00 350.00 360.D0 300.00 ~50.00 ~50.00 ~O3.OO 550.00 550.00 500.00 550.00 650.00 600.00 750.03 750.00 700.00 850.01 850.00 800.00 350.01 960.00 903.00 1350.01 1060.00 1000.00 1150.0! 1160.00 1100.00 1250.01 1260.00 1200.00 1350.02 1350.00 1300.00 1~50.02 1450.00 1~03.00 1550.03 1560.00 1500.00 1550.0~ 1660.00 1600.00 1760.38 1760.00 1700.00 1~50.3~ 1860.00 1800.00 1350.91 1960.00 1900.00 nq2.08 2060.00 2000.00 ~.¢2 2160.00 2100.00 .~8.11 2250.00 2200.00 2373.35 2360,00 2300.00 2~B0.18, 2450.00 2~00.00 2557.7~ 2560.00 2500.00 2597.39 2560.00 2600.00 2911.50 ~750.00 2700.00 2328.72 2850.00 2900.00 33~7.37 2960.00 2900.00 3156.3~ 3060.00 3000.00 32~6.¢5 ]160.00 3103.00 3~15.77 3260.00 3200.00 3552.73 3360.00 3300.00 369.~.07 3460.00 3400.00 3856.~2 3550.00 3500.00 4028.25 3560.00 3600.00 4202.¢8 3760.00 3700.00 43?9.55 3860.00 3800.00 CDJRSE VERTICAL ~OSLEG 2EVIaTIMN &ZIMUTH SECTION SEVERITY 3EG ~IN DE3 MIN FEET DE~/iO3 0 0 N 0 D E 0.00 O. O0 0 8 S 3~ 47 E -0.07 0.33 0 10 S 38 23 E -3.35 0.52 0 13 S 1Z 25 E -0.~7 0 15 S 30 23 E -3.72 0.63 0 11 S 15 ~5 W -1.01 1.~5 0 13 S 38 28 E -1.33 1.40 0 13 S ~ 45 W -1.60 1.17 0 9 N ~5 41 E -1.74 1.OO 0 8 S 29 31 E -1.80 1.1~ 0 12 S 2~ 23 E -1.93 0.51 0 20 N 79 50 E -1.99 0.32 0 20 N 79 21 E -1.92 0 29 N 88 45 ; -1,99 D.53 0 33 S 8~ 5 E -2.14 3.55 0 34 S 78 45 E -2.30 3.11 0 ~2 S 55 23 E -2.77 D.44 0 54 S 6g 52 : -3 66 1 31 2 ~1 N 5~ 35 c -2.85 3.01 5 20 N 3~ ~3 E 2.15 2.77 6 10 13 16 19 21 22 26 30 32 55 N 5 3~ E 11.93 3.78 25 N 1 5 W 27.14 3.69 52 N 5 37 E ~8.71 3.4~ ~3 N 12 35 E 75.55 3.53 21 N 9 22 E 10?.60 2.85 22 N 5 5~ E 14~.69 3.59 30 N ¢ 33 E 183.88 3.93 35 N 5 37 ~/ 228.75 7.05 32 N 9 13 W 283.42 1.51 15 N 5 ~5 W 343.96 2.13 32 32 35 41 44 48 53 54 55 55 ~6 N ~ 5 W 407.68 0.92 $5 N 2 59 W 472.09 0.47 59 N 2 Z? W 538.60 7.4~ 22 N ~ 12 W 620.45 2.73 57 N ~ ~ W' 713.89 2.91 19 N 2 49 W 819.28 3.18 26 N 2 13 W 9~1.98 2.75 38 N 1 41 W 1081.70 1.OZ 18 N 9 58 W 1224.38 0.79 52 N O 28 W 1370.50 0.15 SU)-SE~ DEPTH R:'TANSULaR C0]RDIqATES H]RIZ. NORTH/SOUTH E~ST/WEST DIST. FEET FEET FEET 0.00 ,~ O.O0 E O.DO 0.07 S 0.05 E 0.09 0.35 S 0.1~ E 0.38 0.~+7 S O.O5 E 0.~7 0.72 S 0.~5 E 0.72 1.31 S O.11 E 1.O1 1.32 S O.ZO E 1.34 1.59 S 0.28 E 1.52 1.13 S 0.~+3 E 1.77 1.79 S 0.5~ E 1.87 1.91 S 0.75 E 2.05 1.96 S 1.1.~ E 2.25 1.87 S 1.71 E 2.54 1.33 S 2.¢3 E 3.10 2.35 S 3.33 f 3,~1 2.19 S f,.30 E 2.53 S 5.25 E 5.88 3.~,9 S 5.47 E 7.35 2.51 S 8.88 E ~).26 2.52 N 13.79 E 14.01 12.~0 N 17.37 E 21.3~ 27.51 N 1?.~2 E 32.65 49.22 N 18.29 E 52.50 75.20 N 22.99 .E 7g.59 108.~0 N 28.74 E 112.15 145.54 N 33.74 E 149.~9 184.96 N 38.26 E 188.88 229.84 N 38.15 E 232.98 284.31 N 29.?9 E 285.86 344.54 N 21.20 E 345.29 ~08.23 N 15.42 E ~72.57 N 11.53 E ~+72.71 539,.02 N 8.58 E 539.09 520.?5 N 3.57 E 52'3.77 714.35 N 3.54 W 714.06 919.33 .l g.17 W 819.38 941.93 N 1~.29 W 1081.57 N 19.37 W 1381.~ 122~.21 4 22,53 W 122~.~Z 1370.33 N 2~.~5 W 1370.55 OE:~RTURE AZIMUTH DES MIN 3 0 E 33 55 E S 21 43 E 7 27 E ~ 41 E 5285 ~) 46 E '3 56 E S 13 5 E S 15 46 E S 21 43 E S 33 8 : s z7 S 51 40 .: S 5g 22 E S 62 59 E S 53 23 E S 61 41 E S 73 36 E Tg 38 E 5¢ 29 E 32 14 E 20 23 E N 15 47 E 1~+ 51 E N 13 2 E 11 41 E 3 25 :,. 5 58 E 3315 2 9 E 1 23 E 0545 0 19 E N' O 17 W 0 38 W 0 52 ,~ 1 3 W 1 1 W A~CD ~LaSKA, IqC. DS 4-22 PRJDHOE B~Y N32TH SLOPE,ALaSKA C3MPUT~TI3N DATE: 1Z-FEB-B5 [NTERPDLATE3 V~LJES :DR EVEN 100 FEET 0= TRUE SJB-SEA ME~SURE] VERTIS~L VERTICAL ]EPT~ DEPTH DEPTH 4551.)4 3960.00 3900.00 ~'ZZ.?5 4060.00 4000.00 ~2.95 6160.00 ~100.00 ~55.62 6260.D0 4200.00 52~1.17 6360.00 6300.00 5618.90 4460.30 5530.~9 6560.00 6500.00 5?79.44 6660.00 6500.00 5955.25 4760.00 6700.00 6124.09 6860.00 4800.00 62B8.68 $960.00 4900.00 6~51.9? 5060.00 5000.00 5514.95 5160.00 5100.00 6779.11 5260.00 5200.00 6950.4~ 5350.00 5300.00 7122.19 5460.00 5~00.00 72~2.58 5560.00 5500.00 7652.33 5660.00 5600.00 7532.26 5760.00 5700.00 7B~7.59 5860.30 5800.00 7)B4.33 5960.00 5909.00 8~'5.23 6060.00 5000.00 . ~.65 6160.00 5109.00 ,2.~6 5260,00 5200.00 8578.39 $360.00 53OD.DO B)~4.B? 5460.00 9013.73 5560.00 5503.00 9184.5~ 6660.D0 6600.00 9356.89 6760.D0 570~.00 9528.¢5 6860.00 5800.00 COJRSE VERTICAL DOGLEG DEVI~TI$~ AZIMUTH SECTION SEVSRITY ]EG lin DEG MIN FEET DE~/IOD 53 56 N 3 31 W 1510.?2 0.51 53 51 N 4 53 W 1649.22 1.47 54 19 N ~ 55 W 1786.67 0.74 54 57 N 4 15 W t927.21 3.¢3 55 30 N 3 29 W 2071.36 0.77 56 12 N 2 35 a 2218.25 0.95 56 67 N Z 2 W 2359.80 1.17 56 10 N 1 37 W 2513.20 0.52 54 36 N 1 59 W 2562.77 0.60 52 36 N 2 16 W 2798.79 2,11 53 1 N 3 26 W 2929.26 2.05 51 61 N 4 20 W' 3058.49 1.3~ 52 41 N 3 57 W 3187.01 0.63 53 1~ N 2 57 W 3317.13 2.4~ 54 3' N 1 25 W 3~55.28 1.31 54 22 N O 12 W 3595.83 1.71 53 47 N 3 ~4 W 3733.75 1.11 53 ~4 N 4 33 W 3870.39 0.49 5~ 35 N 3 44 W 6008.01 1.25 55 22 N 1 5) W 6152.10 0.73 55 58 N 4 45 W %297.67 3.45 56 12 N 6 3 W 4447.97 1.32 54 ~2 N 6 21 W 4596.57 ~.32 53 17 N 3 36 W ~731.23 3.44 53 1 N 3 ~? W ~85~.5~ 53 16 N 3 33 W 6996.54 3.3~ 54 6 q 3 33 W 5132.53 1.21 54 14 N 3 21 W 5271.04 D.33 54 41 N 3 ZO W 5~11.23 ~.37 54 29 N 3 ) W 5550.58 1.15 55 I1 N Z 22 W 5592.23 1.25 54 3 N 0 33 W 5836.6? 0.62 52 ~5 N 3 21 E 5958.03 1.19 52 16 N 0 O E $098.01 51 17 q 1 26 W 5224.71 0.85 51 Z? N Z 15 W 534~.14 0.6~ 52 16 N Z 55 ~ 5475.20 0.6~ 52 ~8 N 3 3 W 6606.68 0.80 53 !6 N 3 ? W 5739.89 D.60 52 51 N 1 l? W 5874.33 1.6~ 9?Ol. BB 6960'00 5900.00 9875.93 7060.00 ?OOD.O0 1'03~2.55 7160.00 ?IOD.OO 10206.72 7260.00 ?203.00 10358.14 7360.00 ?30D.O0 105~7.77 7460.00 ?403.00 10539.4B 756'0.00 TEOD.O0 10353.92 7660.00 7500.00 11020.54 7760.00 770~.00 11188.11 7860.00 ?800.00 DATE DF SURVEY: Z~-JqN-85 KELLY BUSHIN~ ELEVATIDN: ENGINEER: B&RB~ 7 53 .OD FT Sd$-SEA DEPTH R:'TANSU'LAR CD]R3I~ATES H$RIZ. NDRTH/SOUTt EAST/WEST DIST. FEET FEET FE~T 1510.45 N 30.28 W 1510.T5 154~.T6 N 33.19 W 1549.23 17~5.93 N 51.59 W 1786.58 1~25.22 ~ 62.94 W 1~27.25 2070.15 N 72.80 W Z071.44 2216.89 N 80.41 W 2218.35 2363,35 N 85.19 W 2369,92 2516,57 N 91.27 W 2518.32 2561.16 ~ 95.35 W 2562.90 2797.03 N lOl. T1 W 2798.93 2)27.~8 N 105.10 W 2929.60 3~56.53 N 114.~3 W 3358.67 3154.83 N 124.43 W 3187.26 3314.79 N 132.15 W 3317.42 3653.33 N 133.03 W 3~55.59 3593.37 N 140.35 W 3596.11 3731.26 N 143.29 W 3734.01 3~67.58 N 153.35 W 3870.72 ~005,38 ~ 153.45 W ~003.~1 4149.04 N 17~.42 W 4152.53 4294.51 q 175.03 W 4298.12 6644.65 N 191.49 W 464~.57 6592.73 N 205.71 W 4597.33 4727.20 N 214.41W ~732.06 4859.32 q 223.25 W 4864.45 6392.15 q 231,64 W 4997.52 5127.97 q 240.09 W 5133.58 5265.31 N 248.31 W 5272.15 5606.33 ~ 256.24 W 5412.60 5545.53 N 264.16 W 5551.81 5587.D~ N 270'99 W 5693.50 5329.43 N 276.88 W 5935.90 5~62.B2 N 275.%1 W 5~69.18 5292,88 N 274.21 W 6099.04 ,6219,58 N 275,82 W 6225.69 5343.94 N 280.1~ W 6350.12 5670.89 N 285.98 W 6~77.21 5501.24 N 292.78 W 6507.73 5734.30 ~ 300.09 W 6740,98 6~68.54 q 305.50 W 6875.44 3EP~RTURE AZIqUTH 353 MIN N 1 21W ,N 1 39 W 1 52 W 2 4 ~/ Z 4 W Z 8 W 2 14 W N Z 16 ~/ 2 17 ~' N Z 14 ~1 2 11 ~ 2 16 W Z 20 ~ 2 21 & Z 43 ~ 2 38 2 Z 34 W 2 32 W Z 31 W Z 31 W N 2 32 W N Z 33 W Z 32 ,~ A~'O DS 4-22 NORTH SLD:~E~~L~SK~ CgMPUT~TION D~TE: 12-FEB-B5 TRUE MEASURED VERTICAL 3EPTH DEPTq 11351,88 I~:16,72 ~060.30 I~ ~.72 B160,00 . .00 8260.00 12~18,79 ~350.00 12229,94 12~.29.81 ~550,~0 12535.B3 3550.00 12~4.5~ ~750.00 IZB93.~O B783.35 INTERPOLATED VAL~ES ~gR EVEN 100 FEET DF SJB-SEA CDJRSE VERTICAL DDG~EG VERTISAL ]EVI~TIDN AZIMUTH SECTION SEVERIT~ DEP[H lEG ~IN DEg MI~ FEET DE~/IO~ 790},00 8000.00 8100,00 8300,00 ~0},00 8500,00 ~600,00 8700.00 8723.35 52 32 N I 9 W 7004.02 52 15 N 0 52 ~ ?135,06 1.53 50 i N D 2~ W ?258,64 0,4? 53 ~7 N O 2~ E 7383,82 2.55 60 3 N 1 55 E ?535.53 3.60 $0 19 N 3 0 E T722,05 1,99 59 57 N 2 50 E 789~,42 0,73 61 38 N 1 '~ E ~07~,18 ~.73 61 ll N 0 ~1 E 8257,23 $1 [1 N 0 ~1 E 8299,65 D,O0 P~GE ]aTE ]F SDRVEY: 2~-JIN-85 KELLY BUSqlNS ELE~TI]N: ENGINEER: )&RBa 8 FT SJO-SE& DEPTH RE'T~N N]RTH! FEE 3gL4R COORDI/~TES HORIZ, SOUTH E4ST/WEST DIST, T FEET FEET 5998.31 1129.34 7252.~2 737~.13 7530.99 7715.77 7889,~9 8D69.~8 9252,55 8295,11 308.11 W 7305.09 310,4~ W 7135.09 311,90 W 7259.53 312,25 W 7384.74 308.~? W 7537.32 301.35 W 7722.65 290,72 W 7894,8~ 28¢,28 W 8074,~3 281.~ W 8257.47 281.33 W 8299,39 DEPARTURE ~ZIMUTH DES MIN '~ 2 31 W ~ 2 29 ~ ~ 2 27 '~ ~ 2 25 W 2 ZO ~ Z 14 ~ Z 5 ~ 1 57 ~ 1 55 ~ ~0 ~LASKa, I~C. DS 4-22 P~JOHDE BaY NINTH SLDPE,aL~SK& FOP TOP ,3ASE 3/0 PBTO TO M~RKER SADLERDCqI? ZONE lB SADLERDCHIT CONTACT CO~PUT~TIDN INTERPOLATED VALUES FOR DEPTH KB 1227~o00 12550.00 1259~.00 12583.00 12B52.00 1Z~93,00 DATE: 12-FEB-B5 SHDSEN HDRIZDNS FRDM KB B481.72 8619.1~ 8687.60 8533.97 8763.60 8783.35 3RIGIN: Tv'9 1089' 9621.72 8559.'14 8627.50 B573.97 8703.50 8723.35 ~9E g D~TE DF SJRVEY: 2~-J~N-85 KELLY BUSHIN$ ELEVATION: 53.00 :NSI~EER: 5~BA FT ~SL,217' FWL,SE RECT6NGU NORTH/S SJRFACE .DC~TION ~T C ~$,TllY,R1SE~dM L~R C03R]IN~TES ]UTq EaST/~EST 7755.03 N 299.39 W 7994.03 N 2BS.3Z W 8120.58 N 2~3.~5 W 8023.50 N 28¢.63 W 8259.19 N 281.75 W 82~5.12 q 2B1.33 W CO~PUT~TI~ D~TE: 1Z-FEB-B5 P~GE 10 D~TE 3F SURVEr: Z6-J~N-SS DS P~JDH3E B~Y N3~TH SLOPE, ~,L ~,SK/~ KELLY BUSHIN3 ELEV~TI2N: ENSIN=ER: 3~B~ 50.00 F~ 3RIG!N: 1D$9' FSL,21?' S F~ JRF~ L,SE .."E .D"'&TION,., ~T " ZS,Tllt, R15E,'JM TDP TOP B~SE PBTD TO MARKER S~9LERDCqIT ZONE 18 S&~LERgCHIT CONT&CT ME~SJRED OE~TH TVD BELOW KB =ROM KB SJB-SE& 1227~.D0 8481.72 )~21.72 12550.90 3619.1~ 855~.1~ 1Z59~.00 B687.50 ~527.50 12583.00 ~633.97 1235Z.DO 8763.60 8?03.50 12B93.00 8783.35 8723.35 REC N] T&NGU ~FH/S )~.0 1ZO.6 0Z3.5 259.1 2~5.1 LAR COORDIN&TES gUT"( E&ST/REST Z~5.32 W ZB3. ~+5 W 2 ~-~. 53 W 281.75 W 281.33 W FINAL WELL LOC~TI]N ~T TD: TRUE SJB-SEA ME~SJRE~ VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL 3EP~TURE DISTanCE ~ZIMJT~ FEET 2EG MI~ 12B93.00 8783.3.5 8723.35 82)9.89 q 1 55 W SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY ARCO ALASKA !NC WELL DS 4-22 F I ELD PRUDHOE BAY COUNTRY USA RUN DATE LOOOEO ONE REFERENCE 0000712S3 WELL DS 4-22 (1089' FSL, 217' FWL?~S.26, T!iN, R15E) HORIZONTAL PROJECTION NORTH 1 ~100 REF 00007! 263 10000 8OOO GO00 4OOO ~ooo -2000 SOUTH -40OO -8000 HEST $C~I_E = 1/2000 IN/FT -~00 -4000 -20~ 0 2000 4000 8000 8000 WELL DS 4-22 (1089' FSL, 217' FWL,.?'~6, TllN, R15E) VERTICAL PROJECTION 0 0 -0 -4000 -2000 0 0 2000 4000 BO00 8000 10000 12000 -+i+~--F~---N-~.~-~--N--.N-.~-+~-i--i-.~-.~~ .-~~.~.---k~--N-.-N-+.N ...... H-.++N-~.-N.-. ~-.-~-+~---~.-.~-.N...~-..~---~--.H.-~-..~. ~--.~..4...~-.-~ ~s~. .:~_:~...~~t:~? ~:~:~:~-d::.~.~ ~_.~.~~-: d~¢~-.;-~'5 ::~:Z4.~t:~:::~:~.~ :~:.~:::~..~;:~::~:::~:::?:~t:: :::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: '"~"if'f~%~-~' i~%~:~H~"f~ '~f~, ~ f"H"~?%'T'bHd ...... H"'f"h?'H'?"-+H'"h?'*"?"t ...... ~---,'--H-"?~-'-~"-H-- ~:~:::~ ~: :?~:T'7:-~~:~:;:~:: ~:~:~: ::FT::~:~:~: ======================= ::::::::::::::::::::::::::::: :::~:::~7::~:: ::~:~::~::~: '-???Y~"~ ?~'~'-~t'~:'~~-t ...... t?'?~'"Y~ '~?~"~?t'"~T"~-~-!'"~'?t'?-?'t"!"'?~"'~"?"f ....... ~'?t"~ ...... t"'t'-t"~ .... ~-2~:~:kJ:~:J:: ~:~L~::;~:~::: ~t~:~:~:~:L::'''"F :~:~:~.~:~:~ ::~::~?j~:j~:::: :::::::::::::::::::::: :::::::::::::::::::::::: ::j:::j:::j:::j:::: ~4..-~4 .... ~-&4... ~4.~..~4--~-..~ ..... '.4~-~4 ] i ~.-~.4.-.~. ~-~ ~-~.'.~.-~.-~G- .~..~.g-.~..'.-k~..-~..-~...l..-;...~4..4.-~-;-.-~q-.?...~...;...~..; .... -~-~.~4-+-¢- ....... ~-¢--¢~¢~-¢-~--:~~---~ ~--- ' ' : ~-~...-.-&¢.~-~-~ ........... ~ +-~-¢-¢¢.¢-¢. ~+.-¢-¢+--¢~¥4-~.. ..... -~-.4-.4.--~ ..... ~ ¥-~-..~..4...---4-..¢4-4 ...... ~,:~.-+4...; .... '"~-~-FT". ~'~'T-~ ~'~'"r"r" "~-T-~T'I~'T-F' .-~ ~"t ....... ~'-r'~-?F~'T"~ ~ T'T"~-. "~"~ ..... ~"'~-~--~"'r"~-T'" ~-~"r"~"]'r"~'"T'"~'"i'~-r"r"r".-'r"~'~"'T-' -~-~-~--~...~-~-~-..~-?... ~ ~ ~ ~ ...~-.~..-~...~--.~--.~.~.~~ ~ ~ ~ ~ ~ ~ ~ ~ ...... ~--.4..-~.4~ ~ ..... ~..~. ~ . ~ -.~-~-4.--~ ~ ~ ~ ...... ~...~.--~.--~ ~ ~ ~ ...... ~...~...~-~--.~--.4..-&.-~-~~ ~ ~ ~ ~ ~ ..... ~..~-4-..~-~-i-.4.-~~ ~ ~ ~ ~ ~ ~ ...... 4"'~'"~'"4~ ~ ~ ~ ~ ~'"~"'i'"~ z ~ 1 ...... i'"~"~'"4~ ~ ~ z ...... ~'"~"~'"~; ~ .... .-. ~- ;-~-~t-~t-~t.~-.~--~-~ : : : ~--~. ~ ..... . . . . ~-~ ~ ~?-~--~--~.--~-?.~-t. .~-?..?~ ..... ?..?.?..?.~.??...?.~ ...... ~.?t.? ...... ~.~..,..?~ +~:~.--~-~-??~----f ~--??-~-~--~--~-. ?-H-ff f~+-?--. ~-~ f-~--~ ..... H.-~--~--H~..-,-+f +?--~---~-+-?--~ ..... H--'?--~-'-t'-H'+-~-' '-'~--'H--~--~--~-~'-? ~-'~ -4-~ ~-~ ~---~- ~ ' '-4~-~..-~- ~--~--4--~- ~ ' ~--~ ~ ~ : : ~ ~ : ~ ~---4- ~ --. ~ ~-~- - i-~-i ~ · ~ ~ ~ ~- ~ 4 ~-. _~..~.~ ~ ~ ~ ~ ~_LJ~_'.~.~Z~_ _LL~L.~,_~..Z_~LZ~ .~ L' .~- ~.i ~ ~.Z~L.~.~..Z..~...?.??.~,_?..?.~.~..LZ.....Z...~..~?,...?~..?.?..?~...~.~... ..... ..... ...... ...... ..... --~+H.~-+-~--~- -~-~--s--~s~ +~-H++++? '++-~-~~-~.F+-H .... ~s-++-~-s-~+-~+-~--+-)H.+-s-. '-H'+'~"-~)'+++' -~'~ ?~'--~?F~???" "~~ .... ?~ ~ Y?~-'~?'~'~ ;~A~-~"~'"3-~ ~:~ ~-?"'"~-'~"' Y'~"~'- '~'?'~-~'~'T'~-T-~-T"T~'T-~T~"T"T'' ~"~-~'~T'ff'"T f ~ '~'T"~ ;~'~T'" -T-T': '"T-T'T"T"T .... ~"T"~"~'T"T'T-t ..... T"T-T"T" -'T'"T"T-T'' ~"~"T"~T- F'T'"r'T~ _.~::,::~.:2::_~%~:.~:.: ~::,t:~..-~.:~.~ :~;:.F~:~4-: :~~~: ;, ..~: :~.::..::~...c..:._:.:;::F:_.::.,~.~.~:..:::..:,~,.~::: ~::~:::,~ -k-k~ff--~?~-~--?---~.¢--k-F~--~H--H?-~-H.-f-kk~ ~ ~-~-~-V~-?~-~+-%-~-. :~.-..--f ~?-.,r~..?s..~-+.,d...?+.~ ..... f_+.y..f..4...H._?+. --~-~-.~--?-~-.~..-~--?-?-. ................. --~-~-~-?-~---??~ ......... ~ ?.~-~--~-- .... r---~-~.-~--?.-- ................. .--?-?-?-~ .... ?--~--~-]-~--~-.,?-, ~--~---~.-~..- -~-.~..~-, ...... --~-.-~--.~..4 .... ] * ......... ....... ~ ......... ~--.?.T-.-, ...... ?,.?-.~-..?-- i , , , I , , , , , , , , i . , : ..... : : . : . : : : . : . : , . . i . I , i , , ~ i . . : , , . : : : : . t , . . t , , , t · -F.~-?--?~--~.-4..4.-4?~g-~---~g.*~.~?..g-g.-?~ ~ ~ k-?-$g--??~.g---?~.4-L&-g~.-~---.~g-4~4.~-g.4r ~.~..44...~...~ ...... ?4 ...... ~?...?..~...,-- ~+~-.*~-~- ~ ~ ~ +-.~--+-~ ~ ~ ~ ~ +.-~-+4 ~ ~ -*b~+-~-+. ~+~--.~-~.~- --+~ ! u.:~?M~.._¥. ~..+.+..~ ...... ~...F+..~ ...... ~.~---H-. ~.+~..L++-~-~.-:-H-~--. -+--~-~ ~.+-+.+q-~-H.-~ ---~.~--~+- .-+~-H-~-~--~-~-~ .--~-~.~-~++.+----~-+-+.+-~-~..+.-...+--~+-L~e-+-+- .... ~--~---~-~.4-~--.~..., ~ ~ ~ ~ ~ ~ -~-~-.~-4~ ~ ~ ...... b.4-~-~ ~ -~-~-~-~-L4...~.~...~...~ ~ ~ ~ ~ ~ ~ ~ ~ ~---~--~-'~ ~ ~T~:4..~.~.-~-.~ ~ -~.-.~-..~-.-~-~ ~ ~--.~.-~-.~..~-.-~ ~.'4-~-~"~'~4'"~'"~"~"'~~ ~ ~ ,~ ~ ~ ...~...~..-~...~...': ~ ~ ~ ~...~-~...~ ~ ~ ...... ~..4...~...~...t...~...~-~...~~ ~ : ~ : -.-~.~ .?.?__?~_?..~_~..?...?. ~.~-~.~??.,.?~. -?.,~-~,~...~-~-~. ,~,-., ...... ??.,...~?.?......~..?., ...... '--kH~ffkh~--~ff-PH--,--~-~r~~-f-ff-~f--H---k -~-ff~--H ..... ~--H-f-F4-'f-??-H--'?+H--?~ ....... ~-'-H"-~ ....... H+'~-" .-.~4--~.~.-~.~..~4...~ J.-~44-~.--. ~-4..~---~-~-~-.-~$~--~...k ~-~.-~-.~.-.k~.L~ ..... ~.~4..~- J-.~--~.~. 4-..~-4...~ ..... ' ~...~-.-[...~ ...... ~...~J...~....4.-~.~...~-.~ ~..~-~-~-q-~.~.~-.~.-~.4-~4-.4-~.4 .... ~--~.~-$-~--~--~.~-.~-~.~ ~.~.4..-~.. -~-~-4..4 ...... ~4-..~...~...q...¥.~...¥4.,-,-~...~.4.-~ ....... ~-4.--~--.~ .... ~-H--H'+H-'-H--~'--H--~'-'H-H-'H-- :?H-fT'?-H-'ff '---f~-'-?~H--~---:-H-'H-'H~-k ~'"H'" ~'~'"H-'ff' "-H-"f'"f'"~-'H'"H'":'"H'"H'":-'H"'f'"f-: ! ~ N.-k~..~.4---~--.~:-~--~4-4.--F~...~-.~.-~.... 44-.~..-L,..-~.-.~4-~.-~J4-.F~-~--~..~-..4-4-.~-~-.~-.~- 44...~..~.--~...~...~....~.4.4...~...~ 4...z.4...~...~...~...~...~.4.+.~...~...~...~ .... .-~-&-A-~.. ' ~.~..&-'-~.-.z..~4-~.~-~..-&-.~4-- ' -~--4-~-4 .... ~--~,~¥-~-~.. [-~-~.~--~. ~.4-~..~4-.-~.~ ..... ~-4...~..~ ..... ~.4-~.-., ..... ~.--~.4...~.. '.--~-4-~.-.i ..... ~...~...~--~-. .~4--~-~-~-~ ~ ~.4.~.-~--~..~-~.~-~ ..... ~~-~~-~ ~ ~ z-~-.~-~--~-~.-~--.~-~..~..~--~.~......~...~...~..~...4.~.~.-~...~...~-.~.~...~-.. : . i : I : : : : : : : : I : : : : : : , : I : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : · : : : ~ : ~ ~ ~ ,-.~.~-4-.. -4...4...~.~.. -~-4.-~..6...~---~-~.~... -- .... ~4.- .~.~.~ ~-~..4-~. -.4-~.~.-~.. ,.~4-~...~...].-.4...4...~...~,....-~-~...4...4 ..... 6...~..4...s ...... ~-~-.,4.,.~ ...... .-..~.~.,.,... ~.~.L~..-~..~-L~..~.~4-~..-~ ~ ~ ~ ~ I.~E-.FL~-.~ ~-L~-.t...:-.L.~...~-.._L.LL.~.._~...~_.~...~ ..... ~...~..~...~i..~...~..~...~... '~-~'~-~T-T't- '~-7'~'~~' ~-~~ ~ ~ [ ~ [ ~ ~ ~ ~ ~-~'~"T"~-T'~' :"'~?-~? "-~'"~-'~'"~" -~"~'"t'"~ ..... ?t'"t"? ...... t---F-?-!.- ~.-r.-1-1-..t.-. .4-L~.4~. ~.~_LL.~._~..~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~.LLL~iL.~_~_.LL...~.~...j._~...~...L~...j ..... ~...~.4...~.~...~...;...L;... -k-F~--?]'+F'F?"+-FFf'-~"F~'~"-~'FH ' ~ ~ ~ ~ ~ ~ ~ ~ ~'-F~'FH~'-~'''''4-'~'''k~ ..... H...~...~ ...... ~...~...~..-~ ....... ~...;..+..; ...... H.-H...~+.H.-?.. -,?t-~?~-~---~:?-~-~,~i~;~,~ ~ ~ ~ ~ ~ ~ ~ ~~-~ .--~.-~-.~--~..-~-.~--~---~.-:---?~..-~-.-~.-.~-.-:-..~-.~.-?...~-..h...~ "v'-f-~'"~r"~%'v" -:-~--:'~*--~"-~-r%" ~'":'?7[Z~"~- ~%~'"-~-r"~-~'-r"r"r-f- --~f"v"r" '"r"~"r" "v'":'"~'"rd'"r"~'":"', ....... ~'"r'?"t'"~'":'"t"~'"?' ---e--~-~'ff---~!-"~-P-~- ~---~-~-e-+-e-ff-+-~-. ~--~-e-.---~.--~s-~-~e-.~-~+.-~-~..-~-e--~--~ t--~-e--?~ ..... +-~---+-+,--,-.-+-.-~.-.s-+ ...... ~-..+.--s.--+--+-.~...;..-s-..+ ....... *.-.+.--+---+.--~.-.+-.+..+...+.-. _4...L..~_z ..... z_.$_.¢_~ _z...l_z~_~_~_z...$,..~. ,~--L-$...~i ~ ~ ~ ~..~-4 ..~-~ 1-~...~-~..~ ...... ~.;...~...g_]_A..z_~...~ ...... &..z...~...;...l...~...;...~...4 ....... ~...¥.~._z.......;...~...~...4_ ---PH+H---FH---+H'--~'H---FW :-FH'-i ~'-i~--~&-F~ ~.-FF[ } hH i-.-H--H .... H---H'--t-'-H---H ..... H+-~'--FH'--H ....... ~-'-H--?-H--H"-F ...k~-.~-..~.4---~---~. 4.-.~-..N-.-!-~;-..k .4-4-4...; t~;.-~---,-.;~...;~.k-.;4.;.;-.i-.~..~4-;..-.~4.-.;--~.k~...~...;.-.; ...... ~...~...~...~ i44.-;...; ....... ;4...;...~...ki-..i...~..4... · +-Nff+-~?+-H---~-H--~i-,-~~.~H-~--+¢ ~-~ i ii~-~+~---~-~F'H-e-+'-'-++-H---r'H-¥'; ...... ~-'~'t'"~-~-S-S- ~'h,?ffff'-~f-?~H- ! ~ i ~ i ~ i i h-~f'i i f ~ i ?~T?f-'ff?'-ff'f-ff'~-f"'Y'f""'"~'"f-?"?t"f"??~ ..... ~-'~-T+"F'~-'t'"~"'~''' -t~"t??~'~'?~'f ¢ r~¢~'¢'~ i .... f~ h-~ -'~?~'~1-'~-'~'-t-'f ...... t--t---t---~ ~-'~-'~--;-"t ...... ?"f'7"~'"["T-T":'"T' PROdECTION ON VERTICAL PLANE 9S8. - 178. SCP~EO IN VERTICAL DEPTHS HORIZ SCALE = 1/2000 IN/FT ARCO Alaska, Inc. Post Office Bo,, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 February 5, 1986 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' DS 4-22 Dear Mr. Chatterton' Enclosed is a copy of the DS 4-22 Well History to include with the Well Completion Report, dated 01/14/86. If you have any questions, please call me at 263-4944. Sincerely, . Gruber Associate Engineer JG/tw GRU13/L57 Enclosure Alaska Oil & Gas Cans. Corn~,ission ARCO Aiaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AriCO Oil and Gas Company Well History - Initial Report- Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District Alaska Field Prudhoe Bay Auth. or W.O. no. AFE 803979 Rowan #33 ICounty, parish or borough North Slope Borough JLease or Unit #28322 ADL IT]tie Drill API 50-029-21454 Operator AECO Alaska. INC.. Spudded or W.O. begun. Spudded~- Dete and depth ' aa of 8 00 .a.m~ . 10/29/85~- State lO/3O/85 lo/31/85 LL7-01./85 Alaska Jw'" :'22 . IARCO W.I. : ~ .-_'... ' · 21.66% IDM.~. . IHou¢.~ .:. . IPrlor status If a W.O. · I'~' :": '10/:27'/8~?:)-: :-'~ - . . _': - -_ .: .- - ~ . '--.. ~; ~.-~ ... , . .: . Complete ~ord for e~ d~ re~;~.~c-d- - ..... . . .--.. -~ __~:. - _ :~-?/?:f ~-:_';:.~Z..~-~-~-~g;~?~:~.Z:-~?:?~:?: ~ _,' _ · . ._ .. - . :. 20" e. ~14'--- ' ' -;':-~:.-'.:~ 2189~ (1180~)~ Drl~-aut~-hOl~?;:V'-''. ..%-. -. ..-.~.':.:. ~... :._:: .., Wt. 9.3, PV 18, ~' 57, PB-8-~5:~: ~ 18;3~ So1 8 .. _ - Dri & su~. 17~" hole to 2189 1742', 1.8', N52.3E, 1741.N8-~'~- 1.28 rS, 1.29,.' .63 1988' 7.6' N 3.3E, 1987.04 ~, 18 73 VS, 18 87, 10.11 ~ ~ · 13-3/8" @ 2521' 2535', (346'), ND diverter-sys Wtr DD, drl & surv 17½" hole to 2535', circ hole cln, TOE. RU & rn 62 its, 13-3/8", 72#, L-80 + 2 Jtsi 13-3/8", 63# K-55 csg to 2521'. Cat w/3000 sx C$ III, followed by 400 sx CS II. Displ using rig pmps, bump' plug. ND diverter sys. 2114', 12.2°, NO~OE~,.211'I TVD~ 40.VS, 40.52N, 10.4lA 2425', 20.3°, N4'.3E,~_2409_TVD, 127 VS, 127.17N, 20.67E 13-3/8" @ 2521'- 2535', (0'), TIM to DO- Wt. 8.6+, PV 3,-YP 3, PH 12.75, WL --, Sol 2 NU & tst BOPE to 500Opsi. TIH to DO cmt. 13-3/8" @ 2521' 3835', (1300'), Drlg Wt. 9.0, PV 12, YP 16, PH 12.75, WL --, Sol 5 TIH to 2434'. DO FC & cmt to 2478'. Tst csg to 2000 psi. Drl FS + 10' new formation to 2545'. Conduct formation leakoff tst to 11.0 ppg EMW. Jet & drl to 3835'. 2655', 24°, N1W, 2622 TVD, 214 VS, 214N, 23E 3000', 37°, NS.7W, 2919TV D, 388 VS, 388N, 5E 3341', 46.7°, N4.7W, 3177 TVD, 610 VS, 610N, 7W RECEIVED ~-' SO i... 0 ~ "" C' ~' The above is correct For form preparation and distributi~rh see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Date 1/29/86 ]Title Drilling Superintendent ARCO Oil and Gas Companyv~' daily Well History--Interim Inslructions: This form is used during drilling or workover operations, if testing, coring, or perforating, show formation name in describing work performed, Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets un(il final completion. RepOrt official or representative test on "Final" form. 1) Submit "Interim" sheets when filled oul but not less lrequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string unlil completion. District Field ICounty or Parish State Alaska North Slope Borough ] Lease or Unit Prudhoe Bay ADL #28322 Alaska IWefl no. 4-22 Date and depth as of 8:00 a.m. 11/02/85 thru 11/o4/85 11/o5/85 11/06/85 11/07/85 Complete record for each day while drilling or workover in progress 13-3/8" @ 2521' 4727', (892'), Wrk pipe Wt. 9.2, PV 13, YP 12, PH 12.75, WL 39.6, Sol 6 Drl 12¼" hole to 4430', bit quit. Wrk & att to drl to 4488', POH, tight @ 3916'. Wrk free, POH. TIH, rm 3738'-4488', drl to 4727'. PU to make connection, stuck going dn. Wrk stuck pipe, spot 50 bbls Black Magic. RU DA, rn freept, 100% free to btm of jars, stuck @ top colr. Att BO @ btm of Jars w/o success. Shot 1 jt above jars, backed off. TOF @ 4431', POH. PU fsh'g assy, TIH, screwed into fsh & jar; no movement @ surf. RU DA, att to freept again, pipe stuck up @ acc jars during time required to RU freept. Wrk pipe. 3984', 54°, N00W, 3568 TVD, 1119 VS, lllSN, 28W 4606', 54.2°, N4.7W, 3929 TVD, 1695 VS, 1624N, 54W 13-3/8" @ 2521' 4727', (0'), Jar on fsh :Wt. 8.7, PV 12, YP 11, PH 12.75, WL 19.4, Sol 4 Cont wrk'g pipe. RU DA, rn freept, stuck @ 4117', POH. TIH w/string shot, shot @ 4103', broke @ 3440', POH. TIH w/string shot, back off @ 4103', POH w/WL & pipe. TIH, screw into fsh @ 4103', jar on same. 13-3/8" @ 2521' 4727', (0'), Fsh'g Wt. 8.5+, PV 7, YP 9, PH 12.5, WL 9.6, Sol 5 Cont to jar on fsh. RU DA, TIH w/freept, showed free to ±4105' POH. Pmp'd 100 bbls crude & allow to soak. 13-3/8" @ 2521' 3710' PBTD, LD "G" DP Wt. 8.6, PV 7, YP 4, PH 12.0, WL 10.4, Sol 6 Wrk & jar stuck pipe w/o success. BO pipe @ 4106', POOH 15 stds, CBU, PO~. RIH open ended, C&C. Loosing mud @ 70 bbl/hr, reduced to 40 bbl/hr. RU & spot 275 sx Cl "G" w/.2% CaC1 & 1% D-31 balanced plug f/3710'-4066'. POOH, LD "G" DP. Hole stable. The above is correct Drilling, Pages 86 and 87 .IDate 1/29/86 ITM Drilling Superintendent ARco Oil and Gas company,~,,~, Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less Irequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setling of oil string until completion. District ICounty or Parish IState North Slope Borough Alaska ILease or Unit Well no. ADL #28322 4-22 Field Alaska Prudhoe Bay Date and deptl~ as of 8:00 a.m. 11108185 11/o9/85 thru 11/12/85 11/13/85 11/14/85 Complete record for each day while drilling or workover in progress 13-3/8" @ 2521' 3300', Sidetrack Wt. 8.7+, PV 12, YP 13, PH 11.5, WL 8.8, Sol 5 RIH, wsh & rm 2870'-3295', C&C, POH. PU Jetting BHA, RIH to csg shoe, C&C, stage in hole surv'g every 90'. Hole sidetracked @ 2975'. Fin staging in hole, jet to 3300'. 2843', 31°, N8.7W, 2789 TVD, 300 VS, 300.56N, 15.53E 3228', 33°, N1.7W, 3114 TVD, 506 VS, 506N, 2.21W 13-3/8" @ 2521' 8322', Drlg Wt. 9.3+, PV 14, YP 7, PH Drl, jet & surv 12¼" hole 3350', 37.8°, N3.7W, 3213 3881', 53.6°, N2.7W, 3582 4340', 56°, N.7W, 3845 5028', 55°-, N4.7W, 4240 5501', 56.8°, N1.7W, 4506 6161', 53°, N.7W, 4881 6869', 55.3°, N3.7W, 5302 7516', 54.2°, N3.7W, 5675 7638', 54.6°, N3.7W, 5746 8067', 56.6°, N4.7W, 5988 9.5, WL 5.8, Sol 7 to 8322'. TVD, 576 VS, 576N, 5.5W TVD, 956 VS, 956N, 14W TVD, 1332 VS, 1322N, 34W TVD, 1894 VS, 1892N, 66W TVD, 2285 VS, 2283N, 93W TVD, 2828 VS, 2826N, ll0W TVD, 3397 ¥S, 3394N, 141W TVD, 3925 VS, 3922N, 163W TVD, 4024 VS, 4021N, 169W TVD, 4378 VS, 4375N, 184W 13-3/8" @ 2521' 8847', (625'), Drlg Wt. 9.3+, PV 13, YP 8, PH 9.0, WL 5.6, Sol 8 Drl & surv 12¼" hole to 8847'. 8468', 53.6°, N2.7W, 6218 TVD, 4707 VS, 4703N, 205W 8866', 53.6°, N3.TW, 6454 TVD, 5027 VS, 5023N, 222W 13-3/8" @ 2521' 9796', (850'), TIH Wt. 9.4, PV 14, YP 8, PH 10, WL 5.0, Sol 8 Drl 12¼" hole to 9796'. 9081', 54.4°, N2.7W, 6581TVD, 5202 VS, 5197N, 232W 9479', 54.3°, N1.7W, 6811TVD, 5526 VS, 5521N, 243W 9716', 55.7°, N1.7W, 6947 TVD, 5720 VS, 5715N, 249W The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 67 Date ITille 1/29/86 Drilling Superintendent ARCO Oil and Gas Company L~aily Well History--Interim Instructions: This form is used during drilling or workover Operations; If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "'Interim" sheets unlil final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Alaska I County or Parish North Slope Borough Lease ADL #28322 or Unit Alaska Prudhoe Bay IWell no. 4-22 Date and deptll as of 8:00 a.m. 11/15/85 11/16/85 thru 11/18/85 11/19/85 11/20/85 11/21/85 11/22/85 Complete record for each day while drilling or workover in progress 13-3/8" @ 2521' 10,190', (394'), TIH w/turbine Wt. 9.6, PV 14, YP 5, PH 9.5, WL 4.2, Sol 10 TIH, wsh & rm 9600'-9796', drl to 10,190', TOH, PU turbine & TIH. 9,968', 53.7°, N.3E, 7093 TVD, 5925 VS, 5921N, 251W 10,111, 53.3°, N2.3E, 7178 TVD, 6040 VS, 6036N, 248W 13-3/8" @ 2521' 11,497', (1307'), TIH Wt. 10.2, PV 20, YP 8, PH 9.5, WL 3.4, Sol 13 Drl & surv 12¼" hole to 11,497'. 10,242', 52.5°, N1.3E, 7258 TVD, 6145 VS, 6140N, 245W 10,572', 51.6°, N1.7W, 7461TVD, 6405 VS, 6400N, 246W 11,028', 53.6°, N1.7W, 7737 TVD, 6768 VS, 6763N, 257W 11,427', 53°, N .7W, 7976-TVD, 7081VS, 7083N, 263W 13-3/8" @ 2521' 11,718', (221'), TIH Wt. 10.2, PV 20, YP 8, PH 10, WL 3.2, Sol 13 Drl & surv 12¼" hole to 11,718', TOH, chg BHA. 11,642', 50.7°, N1.3E, 8108 TVD, 7257 VS, 7252N, 267W 13-3/8'"@ 2521' 12,133', (415'), TIH Wt. 10.2, PV 18, YP 7, PH 9.5, WL 3.4, Sol 12 TIH, wsh & rm f/11,600'-11,718', drl & surv to 12,133' 11,867', 54.1°, N4.3E, 8245 TVD, 7434 VS, 7430N, 253W 12,083', 60.1°, N4.3E, 8362 TVD, 7614 VS, 7610N, 240W 13-3/8" @ 2521' 12,225', (92'), Rn'g 9-5/8" csg Wt. 10.2, PV 17, YP 6, PH 10, WL 3.2, Sol 12 RIH, precautionary rm f/11,945'-12,133', drl to 12,225', 30 std short trip, C&C, POOH. Chg to 9-5/8" rams, tst bonnets; OK. RU & begin rn'g 9-5/8", 47#, L-80 BTC csg. 12,154', 62.5°, N3.3E, 8396 TVD, 7675 VS, 7672N, 235W 9-5/8" @ 12,201' 12,225', (0'), RIH Wt. 10.2, PV 22, YP 8, PH 9.25, WL 3.5, Sol 14 RIH w/288 its, 9-5/8", 47#, L-80 BTC csg w/FS @ 12,201'. Cmt w/500 sx C1 "G" w/.75% CD-31, .37% R-5 & .1% D-6. Displ cmt using rig pmps, bump plug. Tst pack-off to 3000 psi. Tst BOPE.' RIH w/8½" BHA. The above is correct For form preparation and distributil[n see Procedures Manual Section 107 Drilling, Pages 86 and 87 Date ITitle 1/29/86 Drilling Superintendent ARco Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show Iormation name in describing work performed. Number all drill stem tests sequentially. Attach description of ail co'res. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ICounty or Parish t Stale Alaska North Slope Borough Field ~Lease or Unit Prudhoe Bay I ADL #28322 Complete record for each day while drilling or workover in progress 11/23/85 thru 11/25/85 Date and depth as of 8:00 a.m. 11/26/85 Alaska Well no. 4-22 9-5/8" @ 12,201' 12,893', (618'), Wsh & rm @ csg shoe Wt. 10.0, PV 14, YP 3, PH 9.0, WL 3.8, Sol 11 Fin RIH, drl FC & 40' cmt. Tst csg to 3000 psi; OK. Drl flt equip + 10' new hole. Conduct formation tst to 12.5 ppg EMW. C&C mud wt to 9.4 ppg. Drl & surv 8½" hole to 12,893', short trip, C&C, POH. RU Schl, RIH w/ DIL/LSS/GR/SP, unable to get past 12,206', POOH, RD Schl. RIH w/DP, wsh & rm 12,803'-12,893', CBU, POOH. RU Schl, att to rn logs, unable to get past 12,212'. Re-rn logs w/knuckle Jr, unable to get past 12,212' WLM, RD Schl. RIH to 12,200', rm to 12,244', raise mud wt to 9.8 ppg, rm 12,208'-12,261', raise mud wt to 10.00 ppg, rm 12,218'-12,240', rtns decreased to 8.5 ppg. Cut mud wt to 9.8 ppg, rm 12,218'-12,240'. 12,500', 60°, N1.3E, 8562 TVD, 7978 VS, 7975N, 223W 12,843', 61°, N1.3E, 8731TVD, 8276 VS, 8273N, 216W 9-5/8" @ 12,201' 12,893', (0'), RU Schl Wt. 10.3, PV 27, YP 10, PH 8.5, WL 5.1, Sol 14 Rm to 12,260', raise mud wt to 10.1 ppg. Pmp 2 sweeps, C&C. Rm 12,260'-12,460'. RIH 5 stds to 12,893', C&C, short trip, CBU, POOH. RU Schl. The above is correct For form preparation and distribl~'tion see Procedures Manual Section '10, DHIling, Pages 86 and 87 IDale 1/29/86 ]Tit,e Drilling Superintendent :ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used Ior reporting the entire operation if space is available. Spudded or W.O. begun Spudded 10/27/85 Accounting cost center code District ]County or Parish I State Alaska [ North Slope Borough ] Alaska Prudhoe Bay ADL #28322 - Auth. or W.O. no. [Title AFE 803979 [ Drill Rowan #33 API 50-029-21454 Operator IA.R.Co. W.I. ARCO Alaska, Inc. 21.66% Date · Date and depth as of 8:00 a.m. Complete record for each day reported 12/02/85 I otal number of wells (active or inactive) on this est center prior to plugging and ~ bandonment of this well I our [Prior status If a W.O. 2030 Hrs. I 7" @ 12,888' 12,893', (0'), RR 9.4 ppg NaC1 Brine Wsh 12,218'-12,345'. RU Schl, att to log w/o success, RD Schl. RIH w/bit, wsh & rm to btm, C&C, POH. RU & rn 24 its, 7", 29#, L-80 BTC csg f/11,898'-12,888'. Cmt w/350 sx C1 "G" w/5% KC1, .5% D-31, 1.2% D-19, .20% R-5 & .2% D-6. Displ using rig pmps. Bump plug. CIP @ 1530 h~s, 11/28/85. RIR w/9-5/8" csg scrpr & bit to 10,908', WOC. RIH, wsh to TOL, CBU, POH. RIH w/7" csg scrpr on 3½" DP, tst lnr lap to 3000 psi. RIH, tag cmt @ 12,660', drl cmt to FC @ 12,852', circ hole cln. Tst lnr to 3000 psi. Rev circ & displ hole w/9.4 ppg NaC1 brine, POH. RIH w/HWDP, POH & LD same. Displ 400' w/diesel. ND BOPE, instl tbg spool & hgr & tst; no tst on 9-5/8" pack-off. Chg pack-off; no tst. Chg tbg spool, tst to 5000 psi; OK. RR @ 0830 hrs, 12/1/85. u' -~ 2 J 0 ij OIdTD INewTD [PBDepth 12,893' 12,852' Released rig ] Date IKind of rig 0830 Hrs. 12/01/85 Rotary Type completion (single, dual, etc.) Single Classifications (oil, gas, etc.) Oil Producing method Official reservoir name(s) Flowing Prudhoe Bay Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and dist~bution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Superintendent ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 January 17, 1986 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 4-22 Dear Mr. Chatterton: Enclosed is the Well Completion Report for DS 4-22. The bottomhole location, TVDs, geologic markers, and the tubing details will be submitted when the gyroscopic survey is run and the well completed. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG/tw GRU13/L09 Enclosures Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA --~ ALASKA( , AND GAS CONSERVATION CCc /llSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED I-~x ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-21454 4. Location of well at surface 9. Unit or Lease Name 1089' FSL, 217' FWL, 5ec.26, T11N, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number To be submitted when gyro is run. 4-22 At Total Depth 11. Field and Pool To be submitted when gyro is run. Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 60' RKB ADL 28322 ALK 2320 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 10/27/85 11/23/85 12/01/85 N/A feet MSL N/A 17. Total Depth (M D+TV D)i 2893 'MD 18. Plug Back Depth (MD+TVD)i 2852 'MD YES19' Directional Survey[] NO {~X I20' Depth where SSSV setN/A feet MD I21 ' Thickn'ess °f Permafr°st1850 ' ( app rex ) 22. Type Electric or Other Logs Run None 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# U-40 Surf 114' 30" 1800# Polyurethane 13-3/8" 72.0#/68. # L-80/K-.:5 Surf 2521' 17-1/2" 3000 sx CS Ill & 400 s. CS II 9-5/8" 47.0# L-80 Surf 12201' '1-2-1/4" 500 sx Class G 7" 29.0 L-80 11898' 12888' 8-1/2" 350 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test ' Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL el L GRAVITY-APl (corr) Press. 24-HOUR RATE "~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wate r. Submit core chips. None · !-~. Alaska OU ~ u~,~ uu~s. uu~unission ^nchorag¢, Form 10-407 TEMP3/WC38 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ~' :.:~ ":' GEOL'OG-IC-MARKERS !':~ '~: ' .ti :. ~, :: ::-" ~';::{;: i:: ~.' '.t:; ::'.:' ~:i ':"FO~I~,T.'I'ONf~'E:s:T~' "~" .: ' .~; ? , - , .. . NAME Include interval tested, pressure data, all fluids recovered and graviiy, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. N/A .-- N/^ . ; 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed i~ ~ ~~ Title Associate Engineer Date /°/4-<~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' ClasSificat'ion of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 TEMP3/WC38a ARCO Alaska, Inc. Post Office BoX 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 December 23, 1985 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT: DS 4-22 Dear Mr. Chatterton- Enclosed is a Sundry Notice for DS 4-22. We propose to clean out this well and run cased hole logs. Following logging, the well will be completed with a 4-1/2" tubing string. We will be utilizing a completion rig for this work. We expect to start this work on January 15, 1986. If you have any questions, please call me at 263-4944 or Gregg Walz at 263-4541. Sincerely, J. Gruber Associate Engineer JG/GSW/tw SN/L087 Enclosure ,.RECEIVED "'; ::,~a ~,.~ ~ Gas Co,Is, CommJssi0~ /~nchora~3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELLXtX-I OTHER [] 2. Nameof Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510 4. Location of Well Surface: 1089' FSL, 217' FWL, Sec.26, T11N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 60 ' 12. I 6. Lease Designation and Serial No. ADL 28322 ALK 2320 7. Permit No. 85-233 8. APl Number 50- 029-21454 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 4-22 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other '~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee20 AAC 25.105-170). ARCO Alaska, Inc., proposes to clean out this well and run cased hole logs. run. A completion rig will be utilized for this work. A 4-1/2" tubing string will be A subsequent sundry will be submitted following this workover outlining the completion details. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. The BOP equipment will be tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated Start: January 15, 1986 ' _FCEIVED bas Cons. Commission Anchorag3 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~ ~ ~,L~)~ J Title Assoc,~6~ E,,~ i,,~,' The space belowO/or Commission use Conditions of Approval, if any: Approved by COMMISSIONER Approved Copy Returned By Order of the Commission Form 10-403 (GSW) SN/125 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Bo,, .~0360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 December 13, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- State Reports Dear Mr. Chatterton- Enclosed are the November monthly reports for the following wells' 2H-9 3A-11 3F-8 4-22 16-19 2H-10 3A-12 3F-9 4-29 L2-3 2H-11 3A-13 3F-10 16-7 L2-21 2H-12 3C-6 3J-9 16-15 L3-15 3A-10 3F-7 3J-10 16-18 WSP-12 WSP-20 If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU12/L129 Enclosures £CEIVED L)£c, 3 985 (~ Gas Cons. CommissioD AnChorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany .. STATE OF ALASKA '~ ALASKA Ol~_ AND GAS CONSERVATION COMMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well7~ Workover operation [] ' 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 85-233 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50-029-21454 9. Unit or Lease Name Prudhoe Bay Unit 4. Location of Well atsurface 1089' FSL, 217' FWL, Sec.26, TllN, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 60 ' RKB 6. Lease Designation and Serial No. ADL 28322 ALK 2320 10. Well No. 4-22 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool For the Month of November ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 2030 hfs, 10/27/85. Drld 17-1/2" hole to 2535'. Ran, cmtd & tstd 13-3/8" csg. Drld 12-1/4" hole to 4727'. Stuck pipe; worked free. Spotted plug f/3710'-4066' w/275 sx Class G cmt. Hole sidetracked ~ +2975'. Cont'd drlg 12-1/4" hole to 12,285'. Ran, cmtd, & tstd 9-5/8" csg. Drld 8-1/2" hole to 12,893'TD (11/23/85). Attempted to log. Tool stopped. Ran, cmtd, & tstd 7" csg. PBTD = 12,852'. Secured well & RR ~ 0830 hrs, 12/1/85. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40, weld conductor set ~ 114'. Installed w/1800# Polyurethane. 13-3/8", 72.0#/68.0#/ft, L-80/K-S5, BTC csg w/shoe ~ 2521'. Cmtd w/3000 sx CS Ill & 400 sx CS II. 9-5/8", 47.0#/ft, L-80, BTC csg w/shoe ~ 12,201'. Cmtd w/S00 sx Class G. 7", 29.0#/ft, L-80, BTC csg f/11,898' - 12,888'. Cmtd w/350 sx Class G. 14. Coring resume and brief description None 15. Logs run and depth where run None 6. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 1~-11-8~ il NOTE--ReportObn this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed· Fnrm 1 n~n~ TEMP2/MR67 Submit in duplicate ARCO Alaska, Inc. ~ Post Office Bo~, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 November 15, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' State Reports Dear Mr. Chatterton' Enclosed are the October monthly reports for the following wells' 1B-1 (workover) 3A-7 3C-15 3J-6 9-24 L2-3 2A-8 3A-8 3F-3 3J-7 9-36 L2-13 2D-12 (workover) 3C-6 3F-4 3J-8 16-17 L3-5 3A-5 3C-13 3F-5 4-21 16-18 L3-11 3A-6 3C-14 3F-6 4-22 18-6 (workover) If you have any questions, please call me at 263-4944. Sincerely, d. Gruber Associate Engineer JG/tw GRU12/L80 Enclosures [ ECEIV£D /~laska Oil & Gas C0r~s. C0rnm.!ssion AnchoraO~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA Oil- AND GAS CONSERVATION COMMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS !1. Drilling wel~(~t~ Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc, 85-233 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21454 9. Unit or Lease Name 1089' FSL, 217' FWL, Sec.26, T11N, R15E, UM Prudhoe Bay Unit 4. Location of Well at surface 5. Elevation in feet (indicate KB, DF, etc.) 60 ' RKB 6. Lease Designation and Serial No. ADL 28322 ALK 2320 For the Month of October , 19 85 10. Well No. 4-22 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool 2. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well @ 2030 hfs, 10/27/85. Drilled 17-1/2" hole to 2535'. Ran, cmtd & tstd 13-3/8" csg as of 10/31/85. 13. Casing or liner ru.n and quantities of cement, results of pressure tests 20" 91 5#/ft, U-40 weld conductor set @ 114' Installed w/1800# Polyurethane 13-3/8", 72.0#/68.0#/ft, L-80/K-55, BTC csg w/shoe (~ 2521'. Cmtd w/200 sx CS III & 400 sx CS II. 14. Coring resume and brief description None 15. Logs run and depth where run None 16. DST data, perforating data, shows of H2S, miscellaneous data None 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Report o~/tthis form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. ~.m ~ n~na TEMP2/MR54 Submit in duplicate October 4, 1985 Mr. T. L. Fithian Regional Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re: Prudhoe Bay Unit DS 4-22 ARCO Alaska, Inc. Permit No. 85-233 Sur. Loc. 1089'FSL, 217'~FWL, Sec. 26, TllN, R15E, U~. Btmhole Loc. 1239'FNL, 2'FEL, Sec. 22, TllN, R15E, UM. Dear Mr. Fithian: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to comm_~encing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. I~7here a diverter system is required, please also notify this office 24 hours prior to-commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. V~ tru~y~yg~s, ~ ~ C. V. Chatter~ton Chairman o f Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION be Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Comservation w/o encl. Mr. Doug L. Lowery ARCO Alaska, Inc. /~'" Post Office Bo. ,00360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 19, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 4-22, Permit to Drill Dear Mr. Chatterton: Enclosed are: An application for Permit to a $100 application fee Diagrams showing the proposed projections of the wellbore Proximity plots o A diagram and description system o A diagram and description We estimate spudding this well any questions, please call Sincerely, T. L. Fithian Regional Drilling Engineer TLF/JRR/tw PD/L173 Enclosures John Drill DS 4-22, along wi th horizontal and vertical of the surface hole diverter of the BOP equipment on October 12, 1985. Rall at 263-4943. If you have AlasKa Oil ~ Gas ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany -'-" STATE OF ALASKA ~"-" ALASKA O~L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [~]X REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL [] DEVELOPMENT GAS [] SERVICE ~ STRATIGRAPHIC SINGLEZON~/ [] 9. Unit or lease name ";. 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 1089' FSL, 217' FWL, Sec.26, TllN, R15E, UN At top of proposed producing interval 1320' FNL, 0' FEL, Sec.22, T11N, R15E, UN At total depth 1239' FNL, 2' FEL, Sec.22, T11N, R15E, UN 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 60' PAD 20' (:iL ADL 28322 ALK 2320 12. Bond information (see 20 AAC 25.O25) Federai insurance Company Type Statewide Surety and/or number #8088-26-27 Prudhoe Bay UnitTM d~ 10. Well number 4-22 11. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool Amount $500,000 15. Distance to nearest drilling or completed 4-20 we1114.5' ~ 2445' feet 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 6 mi. NE of Deadhorse miles 0' (~ Target feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 12837'MD, 8747' TVD feet 2560 20. Anticipated pressures KICK OFF POINT 1700 feet. MAXIMUM HOLE ANGLE 55 o (see 20 AAC 25.035 (c) (2) 19. If deviated (see 20 AAC 25.050) 18. Approximate spud date 10/1 2/85 3125 psig@ 80°F Surface 3950 psig@ 8800 ft. TD (TVD) SIZE Hole 30" 17-1/2" 12-1/4" 8-112" Casing 20" Weight 91.5# Proposed Casing, Liner and Cementing Program :ASING AND LINER Grade Coupling/ Length H-40 Wel~ BTC! BTCJ 2437' I BTC/ z2 z' I 1313/8'' 68.0# K-55 72.0# L-80 9-5/8" 47.0# L-80 7" 29.0# L-80 22. Describe proposed program: SETTING DEPTH MD TOP TVD 80' 40' 41 ' 39' I 40' I 39' I 80' I 80' 37' 1 I 37' 11979' I 8251' I MD BOTTOM TVD 120'1 120' 80'[ 80' 2517'I 2500' 12279'1 8425' 12837'I 8747' QUANTITY OF CEMENT (include stage data) 2000# Poleset 2500sx CS III & 400 sx Class G 500 sx Class G 300 sx Class G ARCO Alaska, Inc., proposes to drill this Sadlerochit waterflood injection well to 12,837'MD (8748'TVD). Logs will be run across selected intervals. A string of 4-1/2", 12.6#, L-80 tubing, packer, and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A separate Sundry Notice will be submitted when the well is to be perforated. A surface diverter will be installed and operationally tested prior to spud. A 13-5/B", 5000 psi, RSRRA BOP stack will be installed on the 13-3/8" surface pipe. It will be tested to 5000 psi (3000 psi for annular) upon installation and weekly thereafter. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus. The annulus will be left with a non-freezing fluid during any extended interruption in the disposal process. The annulus will be sealed with 300 sx of cement followed by Arctic pack upon completion of the fluid disposal process. (cont'd on attached sheet) 23. I hereby certify that the foregoing is true and correct to the best of my knowledge iSIGNED The space below for Commission use TITLE Regional Drilling Engr. CONDITIONS OF APPROVAL Samples required Mud Icg required I--lYES ~Q •YES .,~_O Permit number .~ ... ~ ~ Approval date ;0/.0 /85 Form 10A01 ~) ' PD~17~ t Directional Survey required I APl number [~,~ES E]NO I 50- ~)-/--~" SEE COVER LETTER FOR OTHER REQUIREMENTS .COMMISSIONER DATE Octobe~ 4, 1985 by order of the Commission Submit in triplicate Permit to Drill DS 4-22 (cont'd) DS 4-22 will pass within 14.5' from DS 4-20 at 2445', as per the straight line well path, but will be drilled to the east of existing well 4-20 and directionally corrected back to the west after crossing. DS 4-20 will be shut in during the crossing. There are no other close wellbores anywhere downhole. D84-22 0 0 lOOO 3000 4000 5000 8000 7000 8000 9000 10000 =.~ <o. ~.,~oo ARC'~) AL.a,SKA, INC. 7.5 iICAL~ I IN, I lnfut FI'. 12.5 17.5 13-3/8' C ~SING TVD - 2500 M~ -- 2517 DEP - 144 B/.~ ~7.5 52.5 iCC ~D -- 3569 MD "3886 DEF - 966 N1DEG31 MINW AVERAGE A~ GLE ~ DEG 39 N IN K-lO ~D I 7331i MD I 10~;95 DEP I 1275 K_5 TVE -- 7760 MD -- 11129 [ EP -- 6874~ 9-5/8' C ~SING TVD -- 8425 MI> I 1~79 [IEP -- 7811 LCU TVD ' 8434 MD -- 12294 D ~P -- 7824 T,~P SADLER~CHIT TVD = 8435 MI~ = 12296 )EP -- 7825 G/O =9~[ WD -- 8641 MD -- 12659 DEP -- 8121 ORng~l I TV ~gggil I~I I[ggg ~Gr ~l Ig~ BASE SAI )~ROCHff'~D I 8690 MD -- 121"37 DEP 1185 TD TVD - 8747 MD -- 12~137 DEP - 1265 .................................................. ~ .~F ~-~ ~/ ,ID ...................... 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 0 lo0o 2000 3000 6000 7000 8000 9000 10000 moo 2000 ~000 ~000 sooo 6000 7000 eooo 9000 ~0~00 VERTICRL SECTION ~-~.,~,~> ,~o~; 4000 ~ 5000 "-' ~(~[ · F. - N COOROINR~ES -5000 -~t000 -3000 -2000 -1000 0 i000 2000 I I -5000 -'~000 -3000 -2000 -1000 0 1000 E - N C00RDINRTES 2000 - E - N COOROINFt?£S o -5000 -tO00 -3000 -7.000 -1000 0 1000 2000 I....................................... i i I I· I .................. i · OS~-21 ~S~-22 ~8678 68 :; ' 8689 S~, 24 OS~ 8 _L: L ...... ~ _' ................................. ~ ............... ¢3 F;t";l;~;, ()O;~lFf; ': .. ~ ; !;-;',; i-.'.) r; I -SO00 -4000 -3000 -2000 -lO00 0 1000 ':.~i?? E - N COOROINRTE$ E - N COORD!NFtTES -400 -300 -200 - 1 O0 0 1 O0 200 300 400 I I I I I I I I I I I I I I I I I I ' ' ' I I 1 I I I .I · I I I : ~ DS4-22 023 3320 4342 " ~~7~ ,~oss . , 73 355q 301~ /~073 37 2¢3i f3~5 ~ " 2~9 / ~77 x~ ~:5'~ ~-/~' .... ~ 0 A/:~.jk:, ", ,~-. ,...~ . .. , , , ~ , , ~ , ,~ , , ~ , , ~ , , , ~ , , ,, , , , , ~ , , , . 0 C~ I .. I I -400 -300 -200 - 1 O0 0 ] O0 200 300 £ - N O00ROINRT£S 4OO SURFACE HOLE D IvEI'~TER SYSTEM ARCO ALASKA INC'. SCHEMATIC ! I0" HYD. (]PR. BAI. L VALVE V~L.L BORE I$[[ D[1AIL! I0 HYD. OPR. BALL VALVE ALL 90' 3UItNS ARE "TEE" RE SERVE PIT AREA NOT E: FI.OtSL INE DR ILL lNG RI SER F 20" 2000 PSi ~t· ANNUL~ PRE VENTOR [ 1 i~q[:flTER L I Valves on diverter lines open automati- cally when the annular oreventer is closed. CONOUCTOR PIP[ IO" HYDRAUL lC OPERATED BALL VALVES "DETAIL" ~076010~03 PI~ M LIMO 1.3-S/8" Blip STAC3C OIAGI.~ · ~cor ~l:nrd.? Test 1. Check and fill a~ctmaiat~ reser~ir co prier level vith hTg2'lulic ~uid. z. Alsu~ that ~r~r pressu~ Ls 3000 psi 1500 psi dok~wtr~m ~f the Observe tim, ~ close Ltl unzts all ~Acs are clossd vXth ~ Ix~ off. 4. Retard oa IAOC re~-t. CT~ ac~pt~le lo~r limt :13-$/8" ~ Stick i. FLll ~P sr~.k ami aam~ld ~th · 2. ~ t~t all bold dram s~ are PAIly Hnrk ninUn8 joinc vi. ch I, redocer~tned plu~ · ~. -~ ~ of ~ ~11~ ~m, ~i~ ~ld alSO psi 6. Increue prusm~ co 3000 pst and ~ld ~r · uiatmm of 3 ai.ma~s. Blood prum~v co zo,rv. 7. Open mndJr prm~ur, er ~ ~m ~ ~ ~ p~ ~- ~ ~~ m S~ ~i ~ Mid ~ · 17. ~. ~ ~ s~ ~o ~~ ~r. 18. ti~ly ~tt ~ ay. off ~ joxrrt and pull out o~ hole. Close bliad tbs ami cast to S00O psi ~or ~t lair: 3 R~Yised ARCO Alaska, Inc'~ Post Office vox 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 20, 1985 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Conductor As-Built Location Plat Wells 21-24, 17-18, 29 Dear Elaine' Enclosed is an as-built location plat for you have any questions, please call me at Si ncerely, Gruber Associate Engineer JG/tw GRU6/L112 Enclosure -DS4 the subject wells. 263-4944. If ARCO Alaska, Inc. is a Subsidiary ol AllanticRichlieldCompany SECTIONS Z6 B $5,T. IIN., R. 15 E., i UMIAT MERIDIAN, ALASKA , / .,_ ~ ~ e~ eo ~ ' I! ~~ VICINITY MAP ~ ~ ~!1 , , NO SCALE ~ ~5 ' _ e26 '~~13_ // /,.,, ~ ~ 4'21 Y= 5,9 55~024.76 L AT. =7~ 16'28.74Z6" 205 ~ F.W.L. ~~ ~ 15 ~ ~ m e29 X= 713,001.~ ~.=1~°16~.6~" 1147' F.~L. ~ ~ : ~ > o~ CELLAR BOX ELEV. =19.7 i 6o / > ~ e31 4'Z2 Y= 5,952,~.67 LAT.=~ 16'28.1675" 217' EW.L. ~ ~ X= 713,01 ~.34 LON~=i4~I6'~.331' 1089' ~. 5o m / ~ ~ m --~. CELLAR ~X ELEV.= 20.4 4 e ~ ~ ' 4'25 Y=5,952,908.25 LAT=7~ 16'27.5892" 2~' EW.L. m -- ~ ~ X= 715,029.67 ~N~14~'5~" I0~' F.S.L. = ,e m / : ; CELLAR BOX ELEV.=~I.6 ~ . // 4-Z4 Y=5,952,849.85 L AT.=~I6'~.O112" Z4Z' F.W.L. ,:/~ ~ x= 7,~,o~.70 Lo~=~o~6'~z' ~7~' ~.S.L. ~o ~ CELLAR BOX ELEV.=ZZ.O I · / ~ // 4' 18 Y=5,952,75~.98 LAT.=70°I6'25.8545' ~7' EW.L.~ X= 715,072.15 L~=1~°16'~.870" 854' ES. L. ~ CELLAR BOX ELEV.= 25.0 4'!7 Y= 5,952,674.99 LAT.=70° 16"25.2801" 279' EW.~ X= 715~086.06 LON~=I48° 16~4.51~" 795' F.S.L. NOTES CELLA. . . WITHIN SEC. 4-29 Y=5,951,625.~6 LAT. =70°16'14.8909" 261' EH.L. I. BASIS OF LOCATION IS MON. 4-A X= 715,540.54 LONG.=I~°I6'27.975" ~5'EW.L. AND 4'B PER H.V. LOUNSBURY B CELLAR BOX ELEV.=50.7 ASSOC. 2. BASIS OF ELEVATION IS MON. 4'B - ~ . .~ / PER ~V. ~SBURY ~ ASSOC. ~/~ -: . k~ ~.ALL C'00RDINATE~ SHOWN ARE ~ .,S.R ZONE 4. '~-''~ · ~ PROPERLY REGISTE'RED AND .~ . .. I HEREBY CERTIFY THAT I AM ~"'~ ..... ~'"~ LICENSED TO PRACTICE LAND LEGEND ~?' ~.. ~.. ~ ~, SURVEYING IN THE STATE OF ' e.: ' ~o.~ ~ ALA-S~ AND THAT THIS PLAT 0 EXIST./FUTURE WELL ~-/. ~. :~..,.... ~- 52~ ~'~ REPRESENTS AN AS-BUILT SURVEY ~ CONDUCTOR AS-BUILT ""-'~ ~?~"'..., .-'"~%~ MADE BY ME, AND THAT ALL ~;~,;; u;~ /; :..-...... -~[7. ' '.~ DIMENSIONS AND OTHER DETAILS ..... ~ ,'~; k~, ~,.:,.r_~ ARE CORRECT, AS OF: 4-21-85. II I i a co ka . JOB NO. 7ZI4 NORTH SLOPE ~ILLING-P~HOE BAY I I I I I CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE , DATE (3) e (8) " " , (~ thru ~~ 10. MTI/ %"; (10 and 12).Z 12. (13~ thru 21) (22 thru 26) 13. ,14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. Is the permit fee attached .............................. · Is well to be located in a defined pool ................. ' Is well located proper distance from property line ......... Is well loCated proper distance from other wells .......... Is sufficient undedicated acreage available in this pool . Is well to be deviated and is wellbore plat included ..... Is operator the only affected party ..................... , Can permit be approved before ten-day wait ............... YES NO Do operator have bond in force ' es a 'eeeee.e.e.eeeeeeeeeeeeeeeeee~eee~e Is a conservation order needed ............................... Is administrative approval needed .............. , ................. ,.. Is the lease number appropriate ' eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee. Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ............. Will surface casing protect fresh water zones Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ....... , ..... Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................. Is a diverter system required ....................................... Z~ Are necessary'diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ,_zf'~ psig .. ~ Does the choke manifold comply w/API RP-53 (Feb.78). ................. Is the presence of H2S gas probable ................................. ... Additional requirements ............................................. ~ REMARKS Geo loKy: JAL ~ Engineering: LCS MTM ~_ HJH Y..f': .... rev: 03/13/85 6.011 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE ..... Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX~ .. No special'effort has been made to chronologically organize this category of information. ,o R,,E,CE,iVE.D PAGE: 26 I, 5 I080 20.0O rz A S ~:I.. I :,?E I 2647 12626.0 1 2554.r~ ] 250 '3 ! 2407 1. 2400 12391 123~,~ ~ 2360.~ 123 il 7 ~2975.S JO0.n C f? r' t ,~ I' ~'? C,~ I 1. ,CF. CH 1264.e. e, 12625.5 ! 2554.5 12 S 0 ,?. 0 1 ~2392,0 12377.5 12361 .0 1 234 ?. 5 1 231 '1,0 1, 2303. o I2276,0 ,...El.I. SE:P%TCKS b ~.~.S!-! l F]'F ~. PAGE: c :.1..J. [:,oe d curves 0. 5000 f or each in seoarat, e f:fle$. ch]um~erk~F ?',.].ask. n Cc,~p~t.~r,c Cepter' I$ 'vane ',,;er!ficat~en l,is~r~O PAGE: D F P ? . 1. 2 8 0 ~.:. ~,> C ~ A T. ~' ~' ['~ .. ~ o ,g .... ... . ,,.~ ,. , . ~ ~ ~ . G~CU. C~'.~mD -909 CFTC, -999.250 -999.250 -999,250 -999.250 ,iS ma~e ",t'e.r'~f_1. Catior' ch,l..ur~,herc~e,, .~,185Ka r"o~r,t>ut.j.r,c~ Cer~t. er- '/--0 A~-1 9°, 4. 14;7.7 penr. h D F F ? i.i i ;,f C P, E f','; E ~' ']: [-,' T L, F [. t.; 5' O ¢i."_m C) r, C. I,)D !f C f ~ !;~ v .k.':. S'-,' :l F'f' ~ 2645, o 1 2635,0 ~261n.5 ~ 2607,0 ~2593,5 ! 25 F, 9, ~ 1258c~. 0 !257~.5 ! 2567.0 ~ 2554,5 ~2533.r~ ~ 25.0~, o ~ 24 9 4 · 5 i 24:76,5 ~ 2475. ~ ! 2a7 !, P 12467.5 12463.5 1246O. 5 '! 2449.0 12442,0 1 24,t~ n ! 2400,0 1. 2407.5 2 and ct j pr, ed 2 e~.]rve5 f!nr each oass ST ~.FT. D.~:PTH S'1' 0 F- 12652.0 ~ OFPmh GRCH 12645.5 1.2,617.5 .!. 26c. 7.5 .1. 259 ?,~. fi 1.2567oo 1.25~2.e 1, 25,3-~,~. 0 1. 2471.0 t. 26 ,!, n. 0 ~2593.5 J. 2580.e 1.2562,,0 .i,,254q, 0 12506.5 12495.5 1,24,77.0 12475.5 246f¢ . 5 .1,24,63.5 1.2461,. 5 12442.5 ! 24 t B. 0 :!241,7,.5 !.24'il .0 ~.n senarate f~.les. D E P 7: i,.? IlS Ta~e Ver~.[io~tiof chlur,~},e.r.~er .,'...!aska Coml:..~:t:inr: Cept:er' 2377. o,. J 2.~77. 5 2~74.0 !2R74.5 123a2.~ ~2347.5 1233~.~ 2332.5 ~ 2333.5 2325.n ~ 2325.~ 2.3j. ~. o 12~i_q.n 2317.~ 12317.5 229o. 5 12~9~. 0 22'1~.~ i 2?70.5 # 2 GPCf~, w I T FJ F C iq W. C ~,,t T .O CF'!'C. 672.269 623.458 -999.250 -999.250 ,T.$ 'T'at2e Vel:'f.£]catfop. T:i~t.ir).a .3 -a r'.,, B c l_ J. pnec~ .~ A S fit t',, .[ ,o' !:": D [-'.: P 'I? ~.i ~7 i,.t C ii C N T [) ............... 1 2643.0 12644,. O 12637,0 ! 263r~.~, 1 261,2. n ! 2612.0 1 26(,1~. ~ t2609.0 ! 2S6~.5 ! 2564,0 1.25e)4. O ! 256,~. 0 ?. 2S03. S I 2559. n ~ 2559.0 ~ 255]...5 12552.5 ! 251.2. ~ ! 2~13.5 12s04.5 l 25o5.5 ! 2.497.0 12497.0 ~ 248t~. 5 1 24.90.5 !2:475.0 124'75.5 ~ 24'12. O ~, 247 2.5 ~ 24{~9.5 24,7 ~. 0 I 244,~. 5 !24,50. o 4,' O ~ 24.44, 0 12 .t.], . 1 2~,4,2. ~ ! 2 ~,43. ¢ ~ ~ 4, 33. S 1, 2,134,. :5 12,427. ~ :1242g. 0 12424..5 12426.5 2410. 5 !241. !.,. 5 124.(~ 5 I 2,407.5 ,.,,~ ~ l. 24.01,5 ! 2402,0 ! 239o.~ 12399.(' ! 237 4., o 123'7.4.5 ~ 236(). C !, 2300. ~ separate files. 12334.5 LOG TYPE CLASS ~.~(..~P ~,~'L,[~E. SA}~P E;bE~[. C(',~Of; (HEX) 0 ,~'.; 0 0 00 0 3 I I 4 68 00 O 00000 0 0 O O 00 0 3 1 i 4 ~ 8 0 O (,) 00000 i..) o (? (.'~ 00 0 ;3 i. i 4 ~ 8 00 (") 00000 0 OO<) O0 0 ] 1 I 4 6R 00000000 IS 're, pc !:erj E!catio~ .chlur,,.ber{~er ~la.~K~ Co~rF;,~tio.~ Gert'tel- 7-JA~,i-19q4 '[4:77 PAGE: FC~T CFTC,C~TO I~"C i~ T CFTC 674 938 643:107 309.244 327.938 r':asses for all curves. ar~c~ t, ack, rour~d counts; ari, tnn~etlc average PAr;E: PAGE: 12 ~D r~c;D;.:R e i,:,f~.~'.; ':!'v¢'K Ci,~SS ~,~l'.n ""~;3 SA~' . .. I I ~ I I I I I t III I I I I I III I CF'TC. C~'~ AV 5.041 604.5.!6 -999.25C) -999.2..50 r. aw b a c ,~ q r O U: D C~ .i,.n last 7-J/.,,~]-!994 1.~:77 13 12652. ~) 122.75.o ! '2650. r~ ,1. e 0 ~. 0 ,~'~ L' 'r [) r:~ iji'.! t i i,i 14 Fj R ~,?'r-¢ 44,2 C i' I C - r'~ !. ,,.4 6 1. 2 ~ 011. O P [::; r.? 'p ItC F l'.) IF T., U I D 8 PAGE: 14 DF?q' FT a80155 ~i r, ~.i; P 5 ~ i':' ~ /! Iq O 755 R fi' ~,~ r? p5! 4,60755 T ~,,.r R ~. PSt 4~ o'755 RCF? PS~. CPS ,~80755 C ~? T C 'P S 1 C P 5 ..~. 607 ~ 5 C F' 7',~ P, S !. C P S ~) ,~,~ "~ 755 T F'L S r, S ~. b t3 ~. ~40755 C C 1., P $1 'v a ~ c; 755 1,5 m 4.959 587.9a5 7.113 270.73b ]., 7 - 5 [) V -93 :t. :i i e s ~ backqrot]nd pass' in last fi PA~E: !.6 ! 27(;C~. 0 I 26bP. 0 1 227$.n ! 2~50. a .I_ (-~ O 0. u I'if~ [, !'I C; G ~i P, s ¢' p, ,~ I' ",! 6 D F P T ~.-! ( F' '[' ~; 12201 .0 Pi:{ 0 DI. tCFI[) F'LLJ IDS Cbl~1!T~elr.UOF At~$K~ c-o~!.,~!r, iri.~ C'ent':e.r 7-,7A?,1-:19o,'.i 14,;27 $ PAGE: 17 0000000000 OOI)O000000 0000000000 0000000000 0000000000 O000UnOOO0 0000000o00 00oo0o0000 0000000000 0 0 0 ()0 0 0 0 0 0 ,IS 'ra-e Veriffcat~.of chlum~erq~r .:\~.;3~ka C'o.'~puti. r~c Cent]mr PAGE 1.8 (; P. P S 9 29. '1 '~, ,'~ 'r E r', ;&. f.:, S ,JC. 70o ~Tt:iq:. PS2 660.5!2 r'",.,,'rC.,~s2 ¢;95. oon (]cf,.,. 4. g3.q 31.16.93~ 7..10 0 ] r~70.878 0.0o0 "'~ A PS2. C F'lf:' C. PS ? CFTC. P&? 5.1~9 607. 724 7.643 248.248 ,1,26 ~.n each r~dss in separate STOP ~ 2 26 ], 7 - ¢: r,:: V - ~:," 3 ,!.2700.¢, :12657.0 !es ~' bacKorourld pass l, ast fi PAGg: 19 !' i']gGlh.c,, SPEi-SP (F'PT.'.;'~) : 1.22'!5 12~5e.o I 60 0. C:'! T t~. "F F' L.N/.'~, t~t j' R ~' $ ,hRI!,LEPS C,,~Ii.,C r~;rdPTt~- (E'r]; r, 0 G C P':. ,q ~ (" A S I. i..~ (; (;. C P T,-; ( r;, 'I i: 2.65 0 4, 0 ~,,~ 0 PAC, E 20 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 000 r! 000000 0000000000 0000000000 G ~. P 5,3 7~ 9.0 ,:') ~',t 5.194 592.662 IS ?ar, e :,/er_i,f. ic:,atio-, !,istinc] 7 ,,,-,.I a l.' - 19 q 4 14 :'27 PAGE 768.9,"~ a ] k. 2~:. a u fi COb..~$3 7.3i)~, 932.1.69 CF'lC.PS3 0. o ,.j 7.3~5 260,795 bis TAPE VERIFICATION LISTING EVP OlO~H02 VgRIFICATIO~ [,,ISTING PAGE ** REE[,J HEADER SERVICE NAME ~EDIT DATE ~86/02! 5 ORIGIN : REEL NAME 12]4250 CONTINUATION # PREVIOUS REE~ COMMENTS :~IBRARY TAPE ** TAPE HEADER ** SERVICE NAME ~EDIT DATE ~86/02/ 5 OR~GIN 10000 ?A E NAME ~1230 ONTINUATIO # :Ol COMMENTS ~LIBRAR¥ TAPE EOF ** FILE HEADER FILE NAME I 0 1 SERVICE NA,~ED ~ , 0 VERSION # D!ATE ~AXIMUM LENGTH ~ i024 FIDE TYPE PREVIOUS FILE : INFORMATION RECORDS ~NE~ CONTENTS CN ~ TOWN~ STAT~ CTRY= MNEM PRUO,HoE BAY N. SBOPE A~ASKA USA PRES~ E ** C[,.gMENTS ** UNIT TYPE CATE SIZE CODE oooooo8&g 000: 000 065 Ol 065 000 000 00~ 055 000 000 000 000 003 065 000 000 0102 065 000 000 008 065 0:00 000 006 065 000 000 003 065 UNIT TYPE CATE CODE 000 000 001 065 -'VP O,'tO,H02 YE~,R:[F!'C~T.t. ON [.,ISTING PAGEt ALASKA COmPUTInG CENTER * ************************************************************************************** 3~MPANy = ARCO ALASKA CEb[,, = DS 4'22 ~l" D ~b. .: PRUDHOE BAY ~OUNTY m NORTH 8LOPE ~TATE = AG.ASKA ~ ~U.~R ~T ACC~ ~ ~3o ~DP, R,CK KR SING A,SING 9,625" ~ASING 7.00~" [YPE FLUID ~ BRINE , bUID LEV b - FUh[,, )ENSITY = q,4 INC, B (] R 0 U G H SURF. TG 25221, SURF~,TO ],220 ' ],188 TO 12888' DOGGING NATRIX: SANDSTONE tVP 010,H02 VERIFICATION LISTING PAGE ,VOTES: FF[t,E CONTAINS COllAR LOCATOR SAMPLED AT -,083 FT, COMPENSATED NEUTRON LOG - CASED HOLE (CNL) GAHNA RAY IN CASfNG (GR,CN[,) *~ DATA FORMAT RECORD ~* ENTRY BLOCKS TYPE SIZE REPR CODE EN?RY ~ i ~ ° 8 73 60 9 4 65 ,lIN VP 010,M02 VERIFICATION LISTING PAGE 1 6 I 66 l 0 1 66 ATUm SPECIFICATION BGOCKS NEM SERVICE SERVICE UN,IT API AP1 API AP.[ iD ORDER ~ LOG TYPE CbASS MO[) IEPT MT O0 000 OO 0 R CNb' GAPI O0 3~0 01 0 PHI CNL PU 00 890 ~0 0 'tNb CNb CPS O0 330 ~0 0 CNL CNb CPS O0 330 ]! 0 ~RAT CNb O0 420 011 0 ~NRA CNL O0 000 oo 0 SIZE SPh REPR' PROCESS CODE (OC?'ab) 4 1 68 00000000000000 4 1 6:8 00000000000.00:~ 4 I 68 00000000000000 4 1, 68 00000000000000 4 [ 68 0000Oo0000000000 6.8 000:0 0:00 00000 4 1 68 00000000000000 DATA ** ,EPT 12800.0000 GR 65.5898 NPHI CNb 1396.6875 NRAT 3.6760 RNRA T 1 0,0000 '~PT 12~0~.0000 GR ]3.1680 NPHI 'CN[, 1~5 .6875 NRAT 2.7522 RNRA 'EPT 1~,0000 OR 21.45B0 NPHI · CNh '.5000 NRAT 1.8887 EPT I~400,0000 GR 40,5117 CN5 2131,5000 NBAT 2,2170 RNRA E,PT I 30 ,~ CNL ~07~ 000 GR 21, ~ 9 NPHI . 000 NRAT 1. I~8 RNRA EPT 12200 0000 ~R 94.2148 NPHI ~EPT 121~.0000 GR 44.8867 NP"I CNL 9 ,]125 NRAT 4,6375 RNRA 'BPT 12000,0000 GR 74 9648 NPHI CNL 985.8125 NNAT 4:4734 RNRA 'EPT 11900.0000 GR 67.5898 CNL 863,8125 NRAT 3.9651 RNRA '£P? 1~800 0000 ~R 56 9805 CNL 1170:6875 NRAT 3:6389 RNRA 'EPT 11700.0000 GR 62.4180 'CNb 1003.3125 NRAT 3.8752 ~NRA ,EPT 1{600 0000 GR T 87.0273 NP~I 'CNb {166~6575 N~A ].4026 41.4063 FCNL 356,6406 3.9143 .54 0 FCNb 399 6406 24.6094 FCNb 6,27 3125 2.9612 ' 11,6699 FCNh 1085.6875 2.0667 16,0645 FCN5 889.8125 2.3948 1~.1582 FCNb 1003.3125 .0627 60 3516 FCN5 i79.0625 5~0867 58,9355 FCN5 203,8125 4.7195 56.0059 FCNb 211,8125 4,6531 46,7285 FCNb 179.1575 4,8210 40 7715 FCNb 305.6406 3:8284 45.0684 FCNb 236,4375 4.2429 36.4258 FCNL 326,1406 3.5764 bVP 010,H02 VERIFICATION LISTING PAGE 5 OEPT 11500.0000 GR ~C~L 1187.6875 ~RAT NCNL 11 ,6875 NRAT EPI 11300,0000 GR tNB 993,8125 NRAT DBPT 11~00,0000 OR NCNb 1 41,6875 NRAT DEPT 1 000 875 NRAT DEP? 10900,0000 GR NCNb 1059.6875 NRAT 929, 125 D~PT 10700,0000 GR NCNb 1055,6875 NRAT o oo.oooo DEPT 10500,0.000 GR NCNI. 1003,3125 NRAT NCNb ,8i2.5 DEPT 10: O00O GE NCNb I 3125 NRAT D~PT GR NCN[, NRAT ~'NI.. :' 3125 NEAT DEPT 9900,0000 GR ~CNL 953,3~25 OEPT 9800,0000 NCNL 977,3125 NRA~ 10~.2148 ,8 27 !523 97 3398 3:7112 43,9180 3,6409 1921 59.3242 3'6252 54 ~492 3~ 788 3~.~742 , 198 44.5430 3,6819 7 46,8:555 4,3132 7~,9648 68,6523 3,8850 4]~2305 ,8655 54 4 67 .i'8:98 53,0430 3,8362 NPHI RNRA NPH! RNRA NPH! RNRA NPH1 RNRA NPH! RNRA NPHI RNRA NPH! RNRA NPH! RNRA NPHI RNRA NPHI RNRA NPH! RNRA NPHI RN,RA RNRA NPHI RNRA NPHI RNRA NPHI RNRA NPH! RNRA NPHI RNRA 43 3 42 4 4O 3 50 4 4O 3 37 4 3 .44 ~4 .9453 .0007 .4023 ,8108 ~0898 0632 3 .830! ,8679 ,4785 .5803 .8418 .0632 ,57 2 ,93t9 ,0273 .5554 390 ,8738 ,03:2 .9258 ,2937 ,5078 ,0320 ..3848 .0320 FCNb FCNb FCNL FCNL FCNL FCNb FCNh FCNL FCNb FCNb FCNb FCNb FCNb FCNG FCNb FCNL FCNb FCNL 296.8906 301.1406 244,4375 276.~406 200,6875 309,8906 260.6406 236,4375 270.3906 262.1406 220,,11875 227,0625 235.8125 244,4375 244.4375 23b,3125 236,3125 2.44,3125 hVP OlO,H02 VERIFICATION LISTING P~GE 6 DEPT 9700,0000 GR NC~L 1091,6875 NRAT D~PT 9 0 0000 GR ,6675 NEAT DEPT 9500 ~000 GR NCN[,, 1124:, 875 NEAT DEPT 9400.0000 GR NCNb 1034.6875 NEAT OgPT 9300.0000 GR NCNb 1139,6875 NRAT DEPT 9200.0000 GR NCNb 1048.6875 NRAT DEPT 9100,0000 GR NCNb 962,3125 NEAT OEPT 9000,0000 GR NCNL. 1004,3125 NRA? DE.PT 8900,0000 NCNb 1238.6875 NEAT OEP? 87.00,0000 GR ~CNL 1034,6875 NEAT NCNb .6875 NRAT DE, P? 8 0~:,0000 GR NCNb ,,]12:5 NE.AT OEP? ~i~,~000 GR NCNL , 875 NEAT 'CNb ,3125 NRAT DEPT 8100,0000, GR NCNb 986,8125 NEAT DEPT 800~,~000 GR N NCNb 1.07, 875 44,9180 3,7073 4O 9805 3:6663 8499 43.9492 3.8674 37,9805 3,4260 9492 33,0117 3,5784 3~,7305 32,.4492 3,3928 .5159 3~,7305 ,2776 534 22,5674 3,6292 4~.~055 , 06!g 36,8:24:2 3,.5979 NPH! ENRA NPHI RNRA NPH! RNRA NPHI RNRA NPH! RNRA NPHI RNRA NPM RMR~ NPH! RNRR NPHI R~RA NPHZ RNRA NPH! RNRA NPH! RNRA NPHI RNRA NPHI RNRA NPH~ RNR NPHI RNRA NPHI RNRA 41 9922 4:1882 41.2598 3,6741 44 5801 4:0320 44,9219 4,2312 36.8652 3,5901 0 9 4. 39,6484 3 ,.4690 4~,5039 ,72 B 8 36 2793 3:5334 ,28~2 4~,37 7 38,5254 4.0945 41,3574 4,2273 39 ~ 40 ~ 5762 3,62~3 40 , 0 391 3,3596 44.4824 3.T288 FCNb FCNb rCNb FCN6 FCNL FCNb FCNb FCNb FCNL FCN6 FCNb FCNb FCNb FCNL FCNL FCNL FCNL 260,6406 350,3906 278,8906 244,4375 317,3906 243.9375 277,3906 269,3906 350.3906 260,3906 2S2,562~ 342,6406 285,I406 288,1406 301,3906 211,8125 293,6406 287.8906 LVP OI0,M02 VERIFICATION LIST],,NG PAGE 7 D£PT DEPT NCNb DEPT NCNb DgP? NCNC OEPT DEPT NCNb DEPT NCNb OEP? NCNb b DEP? DEPT oo: ooo 1156 87b NRAT o:gooo oo: ooo 897 125 NRAT 7600,0000 GR 1045,6875 O0 GR 7500'~25 NRAT 1002, 7100,0000 1117,6875 NRAT , NRAT 7~0'0,0000 GR ~170,6875 N~AT 115.8, NRAT 6900e0000 GR 985,8125 NRAT 6800,0000 OR 987~8125 NRAT 101 ~3125 NRAI 1 10,.3125 NRAT 105:5i NRAT 6300,000:0 1051,6875 ~200,~000 9'87:, 125 NRAT 34,7930 3,5803 .8799 3~,6565 40,7930 4,0359 45,5117 3,5842 40,6992 3,7717 :5471 33,7617 3.3108 34 436 30,.1455 3,8733 ' 592 35,6055 3,7209 ,,' 80 33,.26t7 3,6917 18,~9:55 3. 596 ,' 178 NPHI RNRA NPHI RNRA NPH! RNRA NPHI RNRA NPN! RNRA NPH! RNRA NPH! RNRA NPHI RNRA NPHI RNRA NPHI RNRA NPHI RNRA NPH! RNRA NPHI RNRA N:PH! RNRA NPHI RN:.RA NPHI: RNRA NPH! RN:RA 39.b973 3.9417 41,0645 4,1375 47.9980 4,7781 39,7461 3,8772 43.1641 4:2390 5120 0 45,0195 4,0632 42,2363 4,1687 4~,0t76 *9026 3,8772 ,,465 44,:77i54 4,4304 ~ , 34, 3, 690 3~5742 .:5002 FC N £, FCN b FCNb FCNL FCNb FCNb FCNb FCNb FCNb FCNL FCNL FCNb rCNb FCNL FCNL FCNL FCNi., 293,3906 286,!406 187,8125 269,1406 236,3125 269,1406 318,1406 290,3906 288,1406 260,8906 236,3125 253,0625 260.8906 227,8125 228.0625 278,8906 264,8906 2@2,1406 hYP 010,H02 VERIFICATION LISTING PAGE 8 DgPT ~C~b DEFT NCNb DEFT DEFT NCNb CNL NCNb DEFT NCNb DEFT NCNb DEFT NCNb DEFT NCNb DEFT NCNb OEP NCN~ DEPT NCNb DEFT NCNb DEFT NCN[~ DEPT NCNb 6100.0000 GR 894,3125 NRAT 6~ .8125 R.~ T .oooo §900,0000 gR 118.],6875 NRAT 5800.0000 GR 1092.6575 NR~T 5700,0000 GR 1036.6875 NRAT 5~00,0000 GR 94,8125 NRAT 5500,0000 GE X093,6875 NRAT 540.8 0000 GR 103:68.75 N~T 5~00,0000 GR 969,3125 N~AT 109 ,6875 NRAT 0000 GR 5A~',125 NR~T ! , bO00 ~000 G~ ~075~ 875 UR. AT 4900.0000 GR 10~1.3125 NRAT 4800.0000 GR 113],6875 NR~T 4700.0000 GR 1075.6875 NRAT 4600,~000 GR 936. 125 NRAT 4500.0000 G~ T ~077.6875 NRA 4400.0000 GR 1050.6875 NRAT 42.0430 4.3406 , 921 39,324'2 4,1.296 3~.7930 ~:9397 49.~i~930 4.2000 44,6055 3.9~43 3~,4492 .9163 56.2305 4.3328 38,3555 3,7073 35 9~80 3:7327 34.[367 3~8030 26,~330 3, 151 38,3242 3.9788 47.8867 4.2507 37.2305 4.1296 24.9893 3.9177 RNRA NPHI RNRA NPHI RNRA NPHI R~RA. NFH! RNRA NPHI RNRA NPHI RNRA NPH! RNRA NPHI ~.NRA NPHI RNRA NPHI ~NRA NPH! RNRA NPH! RNRA NPHI RNRA NPHI RNRA NPHI RNRA NPHI RNRA NPHI RNRA 960 49,7070 4,39~4 51,~254 4, 000 45 0 8 41,4065 3,9~77 41.1008 968 53,418'0 4,9539 49,~487 4, 78 41.9922 3,7581 42,4805 4.1257 43.7500 3,8772 45 46 9727 4~2546 51.953! 5,2273 49.7070 4,8875 46.19~4 4.0281 FCN:L FCNL FCN[. FCN6 FCN[, FCNb FCNL FCNb FCNL FCN6 FCNb FCNt FCNb FCNL FCNL f'CN6 f'CNI, 190.4375 203.8125 269,3906 260,8906 220,4375 236,4375 277,6¢06 229,0625 195,5625 220,i875 269,i406 260,6406 260,8906 260,8906 252,5625 179,1875 220.4375 260.6406 LVP OIO,H02 VERIFICATION LISTING PAGE 9 OEP? 4300,0000 GR NCHL 987,8125 NRA? DEPT 4200.~000 GR NCNb 982, 125 NRAT DEP? 4~00,0000 GR NCNb 969,3125 NRAT D£PT 4000, GR NCNb 943,~000 125 NRA~ DEPT 3900,0000 GR NCNb 1.004,3125 NRAT DEPT 3800'~5 NRA? NCNb 775, 0 GR DEP? 3700,0000 GR NCNb 713,8125 NRAT ,0000 GR NCNb 768' ,8125 NRAT OEP? 3400~000 GR N,CNI, ?:3.9, 125 NRAT DEP:T 3~,0'000 GR NCNb ,8125 NRAT DEPT 31.~!~, 0000 GR NCNt, ::31~25 NR'A~ DEPT 3'~,.00:0.0 GR NCNb ,3i25 NRAT NRAT ~'9' 4,81,25 NRAT 9~0,0000 GR DEPI GR NCNb NRAT DEP? 2700,0000 GR NCNb 824,.3125 NRAT DEPT 2600,00 52.7617 4,2273 43,]~05 4, 18 42 2305 3:9260 . ~3 39.6992 3,9436 3],8867 ,9534 ~8.8955 4,5!64 34, 35 34,0742 4,4773 2~,'8018 ;'5554 25,~'43 4, ~50 29,6:6~1 4,24 9 33 ~3:67 4:' 390 32,94 NPH! RNRA NPHI R~RA NPHI RNRA NPH! RNRA NPH! RN'RA NPHI R~RA NPH! R~RA NPHI RNRA NPH! RNRA NPH! RNRA NPHI RNRA NPH! RNRA NPHI RNRA NP~! R:N A NPH! RNRA HPH! RNRA NPH! RNRA NPHI RNRA 51,5137 4,0320 54 .45,996! 4,2507 .9707 4~,0007 46,2891 4,.2585 46.4844 4.3210 56,7383 4,8875 000 53,4150 5,0515 54 ~457 4:898 56,0547 4.7195 5~,42 48,681:6 4,1062 007 51,806!6 4,3835 49,4629 4~7351 60:;7910 5,0007 4~,877 ..184~ FCNL FCNL FCNb FCNL FCNE FCNL FCNb FCNb rCNb FCNb FCNL FCNL FCNB FCNL FCNL 244,9375 220,1875 228,0625 235,$125 235,8125 179,5625 146,0625 162,5625 152,1875 154.3125 15~,6875 178,4375 227,i875 208,6875 210,9375 154,1875 i64,8125 2{,8,5625 bVP 010,~02 V~RIFICATION L~ISTING PAGE 1.0 DEPT 2500,0000 GR NCNb 720,3125 NRAT DEP? 2~I,0000 GR NCNb ,,312'5 NRAT 9382 RNRA 16,5205 NPH1 5,2703 RNRA PILE NAME IEDIT ,001 ERVICE NAME ER$ION # DATE I MAXIMU~ LENGTH : 1024 FILETY PE 64,4043 FCN[, 5,1882 70.5078 FCNb 5,1218 138,'8125 129,4375 ,002 1024 ~* ,DAT ORMR RECORD ** :ENTRY ~L~CKS T TYPE SlZ~ REPR ~DE; ENTRY 2 4 1 66 1 8 4 ~ IiNIO 0 1 66 0 DATUM SPECIFICATION.BbOC tqNElq SiC.R:Vi'CE ,ISEIRVlCE: UN~ APl APt APl APl FI,BE SlZE 6P:h oo ~so o~, o o 4 ~ ~. oooooooooooooo DATA ** DEPT 12800,4160 CCL D~PT: 12700,2500 COb DEPT 12600,2500 CCI, 0,0459 '0,,'0093 DVP OlO,H02 VERIFICATION LISTING PAGE 11 DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT DEPT D£PT DEPT D£PT DEPT DEPT D£PT DEPT 12500.2500 CCI, 12400,2500 CCL 12300,2500 CCL 12200,2500 CCL 12100,2500 CC5 12000,2500 CCL 11900,2500 CCL 11800,2500 CCL 11700,2500 CCL 11600,2500 CC5 11500,2500 CCL 11400,2500 CC5 1~300,2500 CC~ 11200,2500 CC~ 11100,2500 CC5 11000,2500 CCL ~0900,2500 CCL 10800,2500 CCh 10700,2500 CCh 10600,2500 CCL 10500,2500 CCh 10400,2500 CCh 10300,:2500 CCh 10200,2500 CCL 10100,2500 CCh 10000,2500 CC[., 9900,2500 CCL 0.0430 0,0391 0,0269 0.0146 '0,0244 '0.0293 0,0308 0,0088 0,0063 0.0083 -0,0093 -0,0112 -0,0078 -0,0117 -0,0088 -0,0098 0,0068 -0,'0088 '0.0132 -0,0098 -0,0142 -0,:0068 0,0073 '0,'0054 0,0073 '0,0t61 -O,OOSq bVP OlO,H02 VgRIFICATIDN LISTING PAGE 12 DEPT 9800.25(}0 CCL DEPT 9700,2500 CCI. DEPT 9600,2500 CCL DEPT 9500,2500 CCL DEPT 9400,2500 CCh DEPT 9300,2500 CCL DEPT 9200,2500 CCh DEPT 9100,.2500 CCL DEPT 9000,2500 CC5 DEPT 8900,2500 CCL DEPT 8800.2500 CC5 DEPT 8700,2500 CC5 DEPT 8600,2500 CCL DEP~ 8500,2500 CC5 DEPT 8400.2500 CCL DEPT 8300.2500 CCL DEPT 8.200,2500 C. CL D:£P? 8100,2500 COb D£PT 8000.2500 CCL OEPT 7900,2500 CCh DEPT 7800.2500 CCL DEPT 7700,2500 CCL DEPT 7600.2500 CCL DEPT 7500.2500 CCL DEPT 7400.2500 CCL DEPT 7300.2500 CCL DEPT 7200.2500 CCL -0.0059 -0.0620 -0.0283 0.0088 -0.0103 0.0107 0,0~61 0,0093 0.0098 -0.0059 -0,0059 1,0167 0,0059 0.0059 ~0,015! -0,.0205 -0,01~2 0.0078 '0,0146 -0,,0142 '0,0078 -0.0078 -0.0137 0,0142 ~0.0142 '0.0171 0,0444 LVP 010,H02 VERIFICATION LISTING PAGE 13 DEPT 7100,2500 CCL DEPT 7000,2500 CCL DEPT 6900,2500 CC[. DEPT 6800,2500 CCL DEPT 6700,2500 CCh DEPT 6600,2500 CCh DEPT 6500,2500 CCL DEPT 6400,2500 CCL DEPT 6300,2500 CCL DEPT 6200,2500 CCL DEPT 6100,2500 CCL DEPT 6000,2500 CCL DEPT 5900,2500 cee DEPT 5'800,2500 CCh DEPT 5700,2500 CCh DEPT 5600,2500 CCh DCPT 5500,2500 CCL DEPT 5400,2500 CCL DEP~ 5300,2500 CCh DEP~ 5200,2500 CCh DEPT 5!00,.2500 CCL D£PT 5000,2500 CCL DEPT 4900.2500 CCL D£PT 4.800.2500 CCL DEPI 4700,2500 CCL DEPT 4600.2500 CCL DEPT 4500.2500 CCL 0.0991 -0.0142 -0,0156 0,0098 0,0195 0,0132 -0,0176 -0,015~ -0,0264 0,0220 0.0166 0,0151 -0.0142 0,.0186 0,0190 0,0186 -0,0181 0,0254 '0,'0171 -0,0410 '0.0~52 0,0352 -0.0645 "'0,054'7 0,0264 -0,0430 ~VP 010.H02 VERIFICATI[~N LISTING PAGE 1.4 )EPT 4400.2500 CCL )EPT 4300.250o CC[, )EPT 4200,2500 CC[~ )EPT 4100,2500 CCL )EPT 4000,2500 CCL )EPT 3900,2500 CCL )EPT 3800,2500 CCL )EPT 3700,2500 CCL )EPT 3600,2500 CCL )EPT 3500,2500 CC5 )EPT 3400.2500 CCL )EPT 3300,2500 CC5 3EPT 3200,2500 CC[~ 3EPT 3100,2500 CC5 9EPT 3000,2500 CCL DEPT 2900,2500 CCL DEPT 2800.2500 CCI,, DEPT 2700,2500 CC[, DEPT 2600,2500 CCL gEPT 2500,2500 CCL DEPT 2433,0000 CCL -0.0528 0.0322 0.0322 0,0283 0,0469 -0,0322 0.0596 0,0557 0.0430 -0.0322 0,1777 0,0586 -0.0508 -0,0352 0,0732 -0,0254 -0,0234 0,0498 -0,0449 -0,0352 0,0732 FILE NA~E :EDIT ,002 SERVICE NAME ~ VERSION # : DATE : MAXIMUM LENGTH : ~024 FiLE TYPE ) NEXT FILE NA~E : bVP OlO,M02 VERIFICATION I, ISTING PAGE 15 ** TAPE TRAILER SERVICE NAME ~ED!T DATE ~$6/02/ 5 ORIGIN TAPE NAME t1230 CONTINUATION # ~01 N£XT TAPE NAMM COMMENTS ILZBRAR¥ TAPE ~[RVICE~AME IEDIT TE 196t02/ 5 REEb NAME )234250 CONTINUATION # tO1 COMMENTS ~LI,BRARY TAPE EOF EOF ********** m. nrrrm