Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-256 v vC LL LOG TRANSMITTAL II, ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT[S] OR CD-ROM FILM COLOR Open Hole 1 1 1 I NK 62 4-01-03 Res. Eval. CH 1 / I 1 Mech. CH 1 Caliper Survey Signed' Print Name: Date ' ~ne:(907) 245-8951 Fax:(907) 245-8952 ', ,, ',\ \ , ProActive Diagnostic Services, Inc., 3 IO K STreet Suite 200, Anchorage, AK 99501 E-mail: pdsanchorage~memorylog, com Website: www.memorylog, com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 197-256 303-091 3. Address 18. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22852-00 4. Location of well at surface 9. Unit or Lease Name 1394' NSL, 884' WEL, SEC. 36, T12N, R15E, UM X = 721677, Y = 5979932 Prudhoe Bay Unit / Niakuk At top of productive interval 1182' NSL, 1830' EWL, SEC. 30, T12N, R16E, UM X = 724239, Y = 5985079 At total depth 10. Well Number 1467' NSL, 1978' EWL, SEC. 30, T12N, R16E, UM X = 724379, Y = 5985368 NK.62 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Niakuk Oil Pool KBE = 59.8' ADL 034635 12. Date Spudded1/5/98 113' Date T'D' Reached 114' Date Comp'' Susp'' °r Aband'l/20/98 4/16/2003 115' Water depth' if °ffshoreN/A MSL 116' NO' °f C°mpletionsZero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey1 20. Depth where SSSV set1 21. Thickness of Permafrost 12206 9542 ETI 12093 9465 ETI [] Yes [] NoI N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, LWD, CDR, ADH, Sonic/NEU/DEN, RFT, USIT/GR/CCL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 116' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 41' 5510' 12-1/4" 2270 sx PF 'E', 440 sx 'G', 50 sx PF 'C' 7" 26# L-80 38' 12190' 8-1/2" 400 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 11649' 11551' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH iNTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11840' Set Whipstock 11840' j P&A with 20 Bbls Class 'G' Cement /'/ 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure 'CALCULATED OIL-BBL GAS'MCF WATER'BBL OIL GRAViTY-APl (CORR) Press. 24-Hour RATE ..... ~. ..'" CORE DATA ~ ~ ~ r ! ~ / ~ ir""~ _28, Bri~ion of lithe~'Pe~sity, fractures, apparent dips and presence of oil, gas or water. Submit core chip~ I,,,,, ~,,~' L,, I V ~ ~ No core samples were taken. MAY ~ 8 ~ 003 Alaska 0il & Gas Cons. Commission ORIGINA L Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. HRZ 11411' 9019' Kuparuk 11779' 9260' Kuparuk 'E2' 11857' 9311' Kingak 11953' 9374' 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble~~ ~~~j~. Title TechnicalAssistant Date NK-62 197-256 303-091 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Dan Kara, 564-5667 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-0~-~~-~' JUN :[ (~ ;~0[~3 Well: NK-62A Accept: 04/15/03 Field: Niakuk Spud: 04/17/03 APl: 50-029-22852-01 Release: 04/29/03 Permit: 203-047 Rig: Nordic #1 Date PRE-RIG WORK 03/29/03 DRIFT TO SCSSV. PULL 4 1/2 QOS SERIAL # QOS-34. RUN TANDEM PETRADAT GAUGES TO TD @ 12085 CORRECTED. PERFORMED SUCCESSFUL SBHPS @ 9100', 9200', 9300' TVD. 03/30/03 RAN PDS FROM 12035' AMS TO SURFACE @ 50 FPM (GOOD DATA). SET 4-1/2 CATCHER SUB @ 11611' SLM. PULLED LGLV'S FROM STA. 4, & 3//PULLED S/O GLV FROM STA.# 2. ATTEMPTING TO SET DGLV IN STA. # 4. 03/31/03 SET DGLV'S IN ST # 4, AND 3. LRS LOADED IA W/D.CRUDE. ATTEMPTING TO SET DGLV IN STA. # 2 04/01/03 SET DGLV IN STA# 2. RETRIEVE 1" DGLV FROM C/S. PULL C/S. RUN SUCCESSFUL PDS MEM. SURVEY. (PRE CTD SDTRK). WELL LEFTSHUT IN. 04/02/03 ATTEMPT TO M.I.T.I.A. TO 3000 PSI. PUMPED 3 BBLS CRUDE TO 3000 PSI. PRESSURE FELL OFF (FAILED M.I.T.). ESTABLISHED LLRT OF 1.2 BPM WITH 40 BBLS CRUDE. PULL STA # 2 @ 9887 WLM, DGLV. ATTEMPT TO SET DGLV. M.I.T. -- I.A. 04/03/03 SET 1" BTM LATCH DGLV IN STA # 2@ 9887 WLM, LRS PERFORMED MIT, PULLED CATCHER SUB, WELL LEFT SHUT IN. MILL NIPPLE, UNDERREAM. KILL WELL WITH 286 BBLS KCL. RIH WEATHERFORD 2 7/8" MOTOR W/3.80" HSD MILL. SET DOWN AT 3231', AND 3997' (TOP 2 STATIONS). ROLLED MILL SLOWLY TO GET BY WITH NO PROBLEMS. TAGGED XN NIPPLE AT 11633' CTD. FLAGGED PIPE. MILLED OUT NIPPLE AND DOWN THRU TAIL. WENT DOWN AND TAGGED TD AT 12085' CORRECTED. POOH, BACKREAMED THRU XN AND MADE DRY PASSES. POOH. O4/O4/O3 MILL XN/UR 7" LINER. POOH FROM MILLING XN NIPPLE. B/O 3.80" DS MILL (STILL IN GAUGE, >3.79"). RIH W/2 7/8" REEVES UR (BLADES OPEN TO 6.15") TO FLAG, CORRECT TO 11642'. OPEN BLADES AT 11670'. UNDERREAM DOWN TO 11880'. MAKE 3 COMPLETE PASSES (11880'-11800') USING 5 BBLS FLOPRO SWEEPS. BACKREAM UP TO TT. OPEN CIRC SUB, RIH TO 11880' THEN POOH AT 80%. FREEZE PROTECT WELL TO 2000' WITH 60/40 METH. LAY DOWN MAST TO ALLOW SLICKLINE RU FOR CALIPER RUN. STANDBY FOR RESULTS. RAN PDS CALLIPER FROM 12000' TO 11000' WLM. CSG ID 6.1" + TO TBG TAIL. TBG CALIPER RESULTS GOOD (>6.10" THROUGH AREA OF INTEREST). TAILPIPE STILL IN PLACE. DRIFT W/DUMMY WHIPSTOCK TO 12010 WLM. READY FOR WHIPSTOCK. JOB COMPLETE. 04/05/03 SET TOP OF BAKER 4.5" X 7" GEN 2 WHIPSTOCK AT 11840', 331 DEG TF, W/3 RA PIP TAGS 10 FT FROM TOP OF WHIPSTOCK AT 11850' CORRELATE TO SWS GR/CCL JEWELRY PERF LOG DATED 2/14/98. GR RAN FOR FUTURE REF, TAGGED AND LOGGED OFF VERIFYING DEPTH. DID NOT TAG TD. SHUT IN. 04/06/03 VALVE SHOP TESTED THE MV/SV/WV TO 3500 PSI. OK. Page 1 ~t Operations Summa Report Legal Well Name: NK-62 ICommon Well Name: NK-62 Spud Date: 1/3/1998 Event Name: REENTER+COMPLETE Start: 4/14/2003 End: 4~29~2003 Contractor Name: NORDIC CALISTA Rig Release: 4~29~2003 Rig Name: NORDIC I Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/13/2003 15:00 - 22:30 7.50 MOB P PRE Rig Released from E-01A @ 15:00Hrs on 4/13/2003. Made general preparations to move rig & load out trucks. 22:30 - 23:00 0.50 MOB P PRE PJSM on moving rig off well. Jack up rig & pull rig to edge of pad. Conduct post-operations pad inspection. 23:00 - 23:15 0.25 MOB P PRE Held pre-move safety meeting with security, CPS, tool services & all personnel. 23:15 - 00:00 0.75 MOB P PRE Move rig from E-01A enroute to NK-62. 4/14/2003 00:00 - 20:00 20.00 MOB P PRE Move rig to NK-62. 20:00 - 20:15 0.251 MOB P PRE PJSM & HNHM for raising derrick & windwalls. 20:15 - 00:00 3.75, MOB P PRE Raise & scope up derrick. Raise windwalls. 4/15/2003 00:00 - 00:30 0.50: MOB P PRE PJSM & HNHM on backing rig onto well. Prep well. Confirm Nk-16 & NK-17 are SI & flowline depressured. 00:30 - 01:30 1.00 MOB P PRE Jack-up & attempt to back rig over well. Observe beaver slide tight against adjacent NK-16 well. 01:30 - 03:30 2.00 MOB N MISC PRE PJSM. Cut off beaver slide to fit in rig over well. 03:30 - 04:00 0.50 MOB P PRE PJSM. Back rig over well & jack down. Accept rig @ 03:00 Hrs on 4/15/2003. 04:00 - 07:00 3.00 BOPSUR P DECOMP N/U BOPE. Meanwhile Spot trailers & tanks. 07:00 - 07:15 0.25 RIGU P PRE PJSM for PJU injector/gooseneck & stabbing CT. 07:15 - 10:00 2.75 RIGU P PRE P/U injecter head. M/U guide arch & stab CT into injecter head. C/O packoff. Cut CT & install DS CTC. Pull test to 35klbs ,,, OK. 10:00 - 15:30 5.50 BOPSUF~ P DECOMP Perform initial BOPE pressure/function test. AOGCC test witness waived by John Crisp. Meanwhile fill rig pits with 1% KCL water. 15:30 - 18:00 2.50 KILL N RREP DECOMP Changeout 9 broken bearing pins on injector. Grease & service injector. 18:00 - 19:00 1.00 KILL P DECOMP Open up well & observe WHP = 900psi, lAP = 500psi, OAP = 35psi, flowline pressure = 200psi & IA injection line pressure = 300psi. IA injection line is blinded @ the IA & manifold. Bleed down lAP to 40psi. Bleed FLP to zero. FL is blinded at btm of S-riser 19:00- 19:45 0.75 KILL P DECOMP Pre spud/safety mtg 19:45 - 21:15 1.50 KILL P DECOMP Fill CT w/KCI. PT inner reel valve. Install cement pup w/big hole nozzle. Stab onto well 21:15 -22:25 1.17 KILL P DECOMP Attempt to liquid pack wellbore w/1% KCI starting at2.7 bpm/2600 psi and gradually reduce rate to 2.0 bpm/2600 psi as well not taking fluid (assume plugged perfs from UR ops). Pumped 164 bbls 22:25 - 23:40 1.25. KILL P DECOMP End kill down BS and swap to min rate down CT. RIH w/BHA #1 at 0.4 bpm/2300 psi WHP at 50-90'/min 23:40 - 00:00 0.33 KILL P DECOMP At 6000', open choke to take returns to flowback tank. Bleed WHP from 2350 to 1000 psi (mostly gas). Maintain 1000 psi while incr rate to 1.0 bpm and circ out gas while continue RIH 4/16/2003 00:00 - 00:45 0.75 KILL P DECOMP Continue RIH while circ out gas. Most of gas gone by 10000'. Red BP to 500 psi and continue RIH pumping 1.0 bpm dn CT and taking returns to flowback tank. MIRU DS cementers 00:45 - 01:00 0.25 KILL P DECOMP Tag WS at 11876' CTD and corr to 11840'. PUH 50k to 11750' and flag CT. Check returns and had fair amount of crude in returns. Drop WHP to zero, incr rate to 2.3 bpm/1350 psi CTP 01:00 - 01:50 0.83 KILL P DECOMP CBU 2.3 bpm/1350 psi w/200 psi WHP w/choke open. WHP gradually fell to 90 psi after one circ, but fluid check showed gas and crude w/KCI (EMW to balance must be closer to 8.5 C/ANNE i 0 2003 Printed: 5/512003 11:28:36 AM Page 2 ~ Operations Summary Report Legal Well Name: NK-62 Common Well Name: NK-62 Spud Date: 1/3/1998 Event Name: REENTER+COMPLETE Start: 4/14/2003 End: 4~29~2003 Contractor Name: NORDIC CALISTA Rig Release: 4~29~2003 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/16/2003 01:00.01:50 0.83 KILL P DECOMP ppg) 01:50 - 03:15 1.42 KILL P DECOMP Incr BP to 500 psi and CBU 2.3/1740. Returns check after 1.5 BU's showed sli crude w/'out' density of 8.13 ppg. Injection test at 1.0 bpm showed steady rise from 500 psi to 1500 psi over 5 rain, but no stabilization. Bleed off WHP to 500 psi. Continue circ 2.3/1750 03:15 - 03:30 0.25 PXA P DECOMP Safety mtg re: cementing 03:30 - 04:00 0.50 PXA P DECOMP Batch up cement while circ 2.3/1750 w/500 psiB~taking returns to flowback tank /~ 04:00 - 04:35 0.58 PXA P DECOMP PT DS @ 3500 psi. Load CT w.,/20 bbls 15.8 p~;;~j~G cement (TT 6:11) 1.5/1110 holding 500 ~sLB.~and.ta~ing returns thru choke to pits 04:35 - 04:50 0.25 PXA P DECOMP Displace cement w/KCl 2.3/880 holding 500 psi BP while RIH from 11750' 30k 04:50 - 05:10 0.33 PXA P DECOMP Red rate to 1.0 bpm and PUH from 11835' 53k w/cement at nozzle at 15'/min. PUH 10'/min from 11790'. After 4 bbls out, . incr WHP to 1000 psi and had 1/1. Incr WHP to 1500 psi by I11730' 1/1, 2000 psi by 11700' 1/1. Lay in rest of cement at 2000 psi to calc WCTOC at 11503'. Est 6-8 bbls cement into perfs 05:10 - 05:30 0.33 PXA P DECOMP PUH to Safety at 11000'. SD pump and monitor w/choke closed at 2415 psi WHP. Lost 200 psi in 15 min (due to assumed annulus cooling from lower temp fluids) 05:30 - 06:00 0.50 PXA P DECOMP PUH 5'/rain 34k while circ 30 bbls biozan to nozzle at 1.0 bpm/2620 psi holding 2000 psi WHP wi 1/1 returns 06:00 - 06:45 0.75 PYA P DECOMP RIH from 10840' 20'/min while circ bio to nozzle at 1.0 bpm (KTTCS). Red WHP slowly to 500 psi while RIH. Begin jetting @ 2.7bpm/2500psi & 500psi WHP at 11750'. Make 3 down/up passes from 11640' (EOT) to 11750' (flag depth) intentionally leaving 38' of cement above top perf. 06:45 - 09:00 2.25 PXA P DECOMP Jet out of hole @ 2.9/2.5bpm & 500psi min WHP dumping cement contaminated KCL fluid. POOH. Trap 500psi WHP & SI MV/Swab. 09:00 - 10:30 1.50 PXA P DECOMP M/U & RIH with side jet swizzle nozzle. Jet stack @ 3.1 bpm/1420psi. POH & L/D nozzle. 10:30 - 10:45 0.25 STWHIP P WEXIT Held pre-operations safety meeting. Reviewed well plan, potential hazards & BHA M/U procedures. 10:45 - 12:45 2.00 PXA P WEXlT WOC to 100psi compressive strength. 12:45 - 13:00 0.25 PXA P WEXIT Slowly open up well & flow check ~ well stable. 13:00 - 13:25 0.42 STWHIP P WEXlT M/U window milling BHA # 2 with HCC DSM, diamond string mill, Baker extreme straight motor, MHA & 2 jts of 2-3/8" PH6 tbg. Stab injector on well. 13:25 - 15:40 2.25 STWHIP P WEXIT RIH with BHA #2 maintaining 500psi WHP. Up wt check @ 11500' = 57.5k & down wt = 26k. Continue RIH & tag @ 11650' ~ looks like XN (milled out to 3.8"). P/U & retag @ same depth. Bring on pumps & establish freespin @ 2.8bpm/1680psi. 15:40 - 15:55 0.25 STWHIP P WEXIT Ease into milling & mill thru the XN with 2 stalls & 2.8bpm/1750psi. Make few passes with & without pumping to ensure there are no restrictions/overpulls. 15:55 - 16:40 0.75 PXA P WEXIT Lab confirms 1700psi compressive strength. WOC to get to 2000psi. 16:40 - 16:45 0.08 PXA P WEXIT Continue RIH BHA #2. Tag cement/bridge @ 11774'. 16:45 - 18:00 1.25 S'I'WHIP P WEXIT Mill cement to 11785' with 2.6/2.6bpm, 2200psi, 60fph ave Printed: 515/2003 11:28:36 AM Page 3 Operations Summa Report Legal Well Name: NK-62 Common Well Name: NK-62 Spud Date: 1/3/1998 Event Name: REENTER+COMPLETE Start: 411412003 End: 4/29/2003 Contractor Name: NORDIC CALISTA Rig Release: 4~29~2003 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/16/2003 16:45 - 18:00 1.25 STWHIP P WEXlT ROP. Getting gassy returns. Choke back 500psi & ream in hole @ 100fph from 11785' to WIS tagged @ 11851.9'. 18:00 - 18:15 0.25 STWHIP P WEXlT S/D pump & SI well. Observe no WHP increase. Open choke. 18:15 - 18:30 0.25 STWHIP P WEXlT Start motor 2.8/1'750 RIH and tag pinch point. Correct to 11844.6' and flag, 59k 18:30 - 21:40 3.17 STWHIP P WEXlT Begin milling window 2.8/1750 PVT 327, IA 567, OA 215. After one circ thru choke and no further gas, divert returns back to normal circ path 21:40 - 23:00 1.33 STWHIP P WEXIT 11847.6' 2.8/1790 400~ diff, 5k wt 23:00-00:00 1.00 STVVHIP P WEXlT 11849.4'2.8/1840300~diff, 2kwt. Mill to11850.8' and appears mill is working on btm of window 4/17/2003 00:00 - 00:25 0.42 S'I'WHIP P WEXIT Continue milling window with mill working on btm of window at 11850.8'. More motor work at 11851.6', then clean (no stalls thruout window milling ops) 00:25 - 01:05 0.671 STWHIP P WEXIT Drill open hole from 11852-862' while swap to used 8.7 ppg FIo Pro mud 01:05 - 02:05 1.00~ STWHIP P WEXIT Ream window area w/no motor work three times 48k, 20k. Dry tag, clean. Official (for now) depths are TOWS 11840, TOW 11844.6', BOW 11851', TD 11862' 02:05 - 04:15 2.17 STWHIP P WEXIT POOH for drilling assy. Pulled 12k over thru XN at 11640' CTD (mills must still be in gauge.. ). Ream and backream w/no motor work 04:15 - 04:45 0.50 STWHIP P WEXIT LD milling BHA. Mill had center wear. Mill and SR both 3.80". Load out tools 04:45 - 05:00 0.25 DRILL P PROD1 Safety mtg re: MU drilling BHA 05:00 - 05:45 0.75 DRILL P PROD1 MU drilling BHA (4.125" bi DPI w/2.57 deg SR motor) 05:45 - 08:00 2.25 DRILL P PROD1 RIH w/BHA #3 to 2nd flag @ 11833' (7' deep). Wt check: Up wt = 53k, Dwn wt = 24k. Run thru window with pumps down & tag btm @ 11869'. Correct depth -7' to 11862'. Check TF ~ @ 30L. ' 0~:00 - 09:50 1.83 DRILL P i:)ROD1 Begin drilling build/turn section with 40LTF, 2.7/2.7bpm, ~ 3500/3800psi & 18fph ave ROP. Drill to 11895' with oc~nal motor stalling. See RA PIP tag @ 11850'. 09:50 - 10:45 0.92 DRILL P PROD1 Orient & drill to 11920' with 15-20LTF, 2.7/~m, 3500/3800psi & 24fph ave ROP. RO~ing better with BH^ out of window. Getting only ~100ft build rates ,,. need 33degs/100ft. 10:45 - 10:50 0.08 DRILL P PROD1 Wiper trip clean to~,,1,~0' for tie-in log. 10:50 - 12:15 1.42 DRILL P PROD1 Log up & see~R~PIP tag @ 11844'. PUH to above window @ 11830~1,~~ag with Geology PDC log. G,~~o ~ct depths to: PRO~~D1 OWS = 11819', TOW= 11823.6', BOW= 11830' & RA PIP Tag = 11829'. 12:15 - 14:15 2.00 DRILL N W~T.~ Review logs & tie-ins with ANC Team & agree to stick to the PDC log which is 4' deeper than the OH sonic log of J 01/22/1998. Whipstock setting log was tied into SWS GPJCCL j Perf log of 2/14/1998 which is on depth with PDC log. Continue checking logs to see if whipstock was set off depth. Meanwhile  DD work out new directional plan based on a 11819' KOP. 14:15 - 14:2~5,, ~. . DRILL P PROD1 RBIH clean thru window to btm @ 11899'. 14:25~,,~E'50 0.42 DRILL P PROD1 Orient TF to 50L. ,t4,rS0-15:00 0.17 DRILL P PROD1 Drill to 11911' with 70LTF, 2.7/2.7bpm, 3500/3800psi & 24fph ,,.., ~-~'~ ave ROP. Observe wrong tie-in depth correlation. Looks like Printed: 5/512003 11:28:36 AM To: Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Dan Kara CTD Engineer Date: March 21, 2003 Re: CTD Sidetrack of Niakuk well NK-62 / Niakuk well NK-62 is scheduled for a through tubing sidetrack with the Nordic 1 cgil. xtrjlling rig. The sidetrack, NK-62A, will kick off from a window milled in the DFS sand and will target tl~B~B~and. All existing perfs will be cement squeezed and the new sidetrack will be completed with a fully c~t~ted liner. -'~' The following describes work planned to prep for sidetracking and is submitted as an attachment to Form 10- 403. A schematic diagram of the proposed sidetrack is attached for reference. 1. Install dummy gas lift valves. Drift and tag TD. 2. MIT tubing, IA, OA./' 3. Run caliper log in 7" liner and in 4-1/2" tubing. 4. Install a mechanical whipstock for an 11840' MD KOP. 5. Either a service coil tub~g'ffn-i't")ar the CTD rig will squeeze 15.8 ppg cement plug across all existing perfs. A minimum)~20 bb.!s,6f 15.8 ppg cement will be used. Cement will be washed down to the whipstock tray. ~ .......... Steps 2-4 will begin as soon as possible with the goal of having the whipstock set by April 5th. CTD is scheduled to mill the window and drill the sidetrack on April 10, 2003. Danny T. Kara CTD Drilling Engineer CC: Well File Terrie Hubble !. Type of Request: (" o. ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL [] Abandon [] Suspend [] Plugging [] Time Extension [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1394' NSL, 884' WEL, SEC. 36, T12N, R15E, UM At top of productive interval 1182' NSL, 1830' EWL, SEC. 30, T12N, R16E, UM At effective depth 1393' NSL, 1939' EWL, SEC. 30, T12N, R16E, UM At total depth 1467' NSL, 1978' EWL, SEC. 30, T12N, R16E, UM Type of well: lla Development [] Exploratory [] Stratigraphic [] Service 12. X = 721677, Y = 5979932 X = 724239, Y = 5985079 X = 724342, Y = 5985294 X = 724379, Y = 5985368 Present well condition summary Total depth: measured 12206 feet Plugs (measured) true vertical 9542 feet Effective depth: measured 12093 feet Junk (measured) true vertical 9465 feet Casing Length Size Cemented Structural Conductor 116' 20" 260 sx Arctic, set (Approx.) Surface 5469' 9-5/8" 2270 Sx PF 'E', 440 sx ~', 50 Sx PF ~' Intermediate Production 12152' 7" 400 sx Class 'G' Liner [] Perforate [] Other / Plug Back for Sidetrack 6. Datum Elevation (DF or KB) KBE = 59.8' 7. Unit or Property Name Niakuk ,/~/~( 8. Well Number / NK-62 9. Permit NuLn~ber 197-256 -- ~10. APl Number 50- 029-22852-00 11. Field and Pool Niakuk Oil Pool Fish: Spinner Blades at about 12087' (07/02) ""'"' MD 'rVD 116' 116' 5510' 5188' 12190' 9531' Perforation depth:measured 11788'-11818', 11860'-11960' true vertical 9266'-9285', 9313'-9378' Tubing (size, grade, and.measured depth) 4-1/2",12.6#, L-80to 11649' Packers and sSSV (type and measured depth) 7" x 4-1/2" Baker 'S-3' packer at 11551'; 4-1/2" HES SSSV Nipple at 2099' 13. Attachments Iia Description Summary of Proposal 14. Estimated date for commencing operatipn April 5, 2003 /' 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number;. Dan Kara, 564-5667 17. I hereby certify that the Signed Dan Kara I"1 Detailed Operations Program I15. Status of well classifications as: lEI Oil r'l Gas [] Suspended Service [] BOP Sketch Prepared By Name/Number: Terrie Hubble, 564.4628 and correct to the best of my knowledge Title CT Drilling Engineer Conditions of Approval: Notify Commission So representative ma~,)uitness ' ' Plug integdty BOP Test /%, Location clearance ~ Approval No..~ ~ ~ ./ Mechanical lntegrity Test X- Subsequent....formrequiredl0-~O'7 T'~L%~' '~oP~ '}Lo '~o ~)~."~'~, / order of the Commission ~,/~ ~'~ Commissioner _ Form 10-403 Rev. 06/15/88 / I x I ] BFL 25 ~.~ubmit In l'riPli~te \ . ,..;.~ ....... TREE = 4-1116" -5M CNV WELLHEAD = 11" 5M FMC GI~I 5 ACTUATOR = BAKER KB. ELEV = 59.8' BF. k'lEV = 23.75' KOP = 3700° Max Angle = 51 @ 6450' = 11173' Datum 'I'VI~': ....... '8~'~';"~S I 9-518" CSG, 40#, L-80, ID = 8.835" H 5510" IMinimum ID = 3.725" @ 11637' 4-1/2'" HES XN NIPPLE 4-1/2" TBG, 12.6~, L-80, 0.0152 bpf, ID = 3.958" Id 11647' PERFORATION SUMMARY REF LOG: SWS USIT ON 01128198 ANGLEAT TOP PERF: 49 ~ 11860' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 2-718" 4 11788- 11818 O 01120102 2-314" 6 11860 - 11960 O 02/14198 I mTD I--I 7" CSG, 26#, L-80, ID ~____~_r.2. 7~" I-I 12093' ~, 12190' ; / J NK-62 2098' 6003' ~ 1'~54o' I-I 11616' Id 11637' I-I 11647' I--I 11654' I--I ~74o'I-I 11760' I"'1 SAFETY NOTES: 4-112" SLVN, HES HIXO, ID = 3.813" GAS LIFT MANDRELS CA-KBG-2-LSI DMYI BL I o 1o8111, C.A-KBG-2-LSlDOMEI BL I 16 108/11, CA-KBG-2-LSlDOMEI BLI16 108/11, CA-KBC-,-2-LSI SOI BL 124 108/11 CA-KBC-,-2-LSI D~'I BL I o 1o8111 4-1/2" HES X NIP, ID = 3.813"I 4-1/2" HES X NIP, ID = 3.813" I 7" X4-112" BAKERS-3 PKR, ID= 3.813" I 4-112" HES X NIP, ID = 3.813" I 4-112" HES XN NIP, ID = 3.725" I 4-1/2" TUBING TAIL WLEG, ID = 4.00" I ELMD'ir LOGGED 02/14198 I MARKER JOINT (ELMD) I MARKER JOINT (ELMD) I FISH - (2) 3-112" SPINNER BLADES FROM PPROF (07~25~02) DATE REV BY COMMBflTS DATE REV BY COMMI~ITS ' 02/13/98 ORIG COMPLETION, (POOL 7) 08111102 RL/KAK GLV C/O :02/27101 SIS-LG FINAL 10/04101 RN/TP CORRECTIONS 01/21/02 CWS/tlh ADD PERFS '07/25102 TMN/KK FISH NIAKUK UNn' WELL: NK-62 PERMIT NO: 197-2560 APl No: 50-029-22852-00 SEC 36, T12N, R15E, 2873.59 FEL 3814.92 FNL BP Exploration (A'lask~) . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supervisor DATE: April 16, 2001 FROM: Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve .Tests Niakuk Field' BPX PBU / Niakuk Pad Aoril 16, 200.1: I traveled to the Niakuk Field to witness Safety Valve System tests on BPX's oil producing wells. Well house inspections were also conducted. The testing went well with Ron White as the BPX representative in charge of testing, 1.2 wells were tested with two failures witnessed, The pilot on NK-12A tripped below 50% of the separator pressure and was replaced and passed a retest, The SSV on NK-62 failed to hold D,P. and was stroked and passed a 'retest. I inspected 12 well houses and all were in order with no exceptions noted, The AOGCC test forms am attached for reference. S, UM,M. ARy,,.;. I witnessed SVS tests on 12 oil producing wells in BPX's Niakuk Field. t 2 wells tested, 36 components, 2 failures witnessed, 5.5% failure rate. 12 well houses inspected, ho.exceptions noted. .. Attachments: SVS PBU Niakuk 4-16-01 JJ CC: ,' · L NON-CONFIDENTIAL' SVS PBU Niakuk 4-16-01 ~ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Ron'White AOOCC Rep: JeffJ~nes Submitted By: JeffJones Field/Unit/Pad: PBU/Niakuk Field Separator psi: LPS 460 . Date: 4/16/01 , HPS .... ' Sss ' .... I ett " '.',:.'.'..'"'.'. :..'. ..W....ettl)ata~':..:":'.....:" :'.." ".?? ':!..:.'...;::....:'...',:':'. ~:'.: :.::'.:'::..':PilotS":, '.'.'..~?:.'. ..':'- '.~.' "'. .... :$$V.:. IZ :':':. '~ .'.."::. Well Permit Separ Set L/P Test Test Test Date Oil, WAG, Number, Number PSI PSI Trip Code Code Code Passed "GAS or C¥cL~ NK-07 1931590 ........ NK-08 1940930 '" 460'' ~5'0 ~50 P' P P ' ' '0iL NK-09 1941400 ,'460' ~550 340 P ~ P ' ' OIL NK-12A 19409,7,0 460 350 200 3 P P 4J16/01 ' 'OIL NK-i3 1961340 .............. NK-14', 'i960~60 460 350 " 3§'0 P P .... ~' 0IL NK-18 1931770 .............. NK-19' 1941230 '" ' ' ' ........ NK'20 ...... 1931910 ' ' 460 ' 350 ~25 P ....... P P ' ' ' OIL NK-21 .... ',19a086~) 460 350 ' 325 - 'P P P 01I~' NK-22 1931350 ........... NK-27, ,, !9502i'''0~.,'' ~4,60.,''350, , 325 P ' P ' ...' '.iP . ' ...... NK-28, 1960930: .... - ~ .~ i , ~ ,, :.. . . . NK-29 1961900' 460 350 250 P P P " oil. NK-34 ' '19808~0 ....... "' " ' ' ....... NK42 ' 1941680 ..... 460 350 · 340" "P ''P P ........ oil NK.61 .... 1981'1io'" 460 "350" ' 325 P P ' P ..... 0IL NK-62, ,19725~0 ..... 460' 350 325 P 4 ..... P 4/16~01 ' oIL L6-26 19400.5.0 , ,460, , .3, 50' "350 'p' ~' P P ............. 0il. Wells: . ~- ~!,.2~ Components: . 36 Failures: 2 Failure Rate: 5.56% 1"]90 Day Remarks: NK-12A pilo,t, ,was rep. la,ced ,apd,Passed retest on 4/16/01 ..NK-62 .stroked valve and passed retest on 4/16/01 ....... ' .... L6- 26 is on the N',mlmk,pad ahd dried into th~ LiSbhm~'ii0nmti0n~ ....... iii I ti . i i i . i i .j i , ,1 . , ,. .... 12 we!! house inspections, no exe.ePtions. '- - :.-- : .. i ''- '' '- ' - .... ." . II. I I I . I I II I RJF 1/16/01 Page 1 of l SVS PBU Niakuk 4-16-01 JJ 197-256-0 PRUDHOE BAY UN N-IA NK-62 50- 029-22852-00 BP EXPLORATION MD 12206 ~,. TVD 09536--' Completion Date: -~13/98 ~npletedStatus: 1-OIL Current: T Name Interval Sent Received T/C/D L ADNOMD ff. Eq',~L 10300-12200 OH 3/31/98 3/31/98 L ADN6-TVD ~'~qAL 8300-9500 OH 1/4/99 1/6/99 L CDR-MD .,F~AL 80-12206 OH 3/31/98 3/31/98 oo. oo OH L DSSI ~A~ I0000-11976 OH 3/31/98 3/31/98 L GAS LIFT SRVY ,~F. IN~L BL 3034-I 1680 ?'. CH 5 3/31/98 3/31/98 L PERF/JWL/GR ~'/~AL 11400-12082 .~..'.'. " ' CH 5 3/9/98 1/10/98 '. L PROD ~I~'AL BL 11718-12038 :";"'... :"......, ",~ CH 5 3/31/98 3/31/98 L RFT '4afffAL 11770-11920 OH 3/31/98 3/31/98 .., .. L USIT R GYRO MULTI SHOT Dally Well Op, I!_,~ .~ -- ~!/~/~ Was the well cored?~).no Comments: f_.PII~AL BL(C) 9S00-12035 ~..,"',.Z" ;t/'~'<~ CH 3/31/98 3/31/98 ^ 4/2Q/98 4/20/98 Are Dry Ditch Samples Required? yes t~),~And Received~o Analysis Description Received?~o Sample Set # / ~ ~ Thursday, February 03, 2000 Page 1 of 1 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 4th, 1999 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached are the sepias for Niakuk well NK-62. Per 20.AAC 25.537(d) BP Exploration- would like these logs held confidential for 24 months. The specific attached logs include: Log T_vpe Company Run Date ADN6 TVD Schlumberger 1/24/98 CDR TVD Schlumberger 1/11-1/20/98 Please contact me at 564-5127 if you have any questions. Marian Sloan CNS - Greater Regional Opportunities MS Enclosures Please sign below and return to Marian,'Sloan, BPX, Mail Stop MB_9;~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 September 29th, 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached are the~.bluelines for Niakuk well NK-62. Per 20.AAC 25.537(d) BP Exploration would like these logs held confidential for 24 months. The specific attached logs include: Log Type Company Run Date Depths ADN6 TVD Schlumberger 1/24/98 11500-12206' CDR TVD Schlumberger 1/5-1/20/98 80-12206' Please contact me at 564-5126 if you have any questions. Sincerely, David L. Boyer, Sr. Geol~ist Greater Point Mclntyre Area MS Enclosures Please sign below and return to Marian Sloan, BPX, Mail Stop MB9-4 for reciept of transmittal. RECEIVED 01 1998 Alaska Oil & Gas Cons. Commission Anchorage BP EXi~_ORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 12th, 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached is core information for the following Niakuk wells. Per 20.AAC 25.537(d) BP Exploration would like this core data to be held confidential for 24 months. Analysis Ty_oe c~- ~ ~ NK-61 Dry Cuttings ~?.Z~ ~ NK-62 Core Analysis report c~ q. ~5.)_. NK-15 Core Analysis report Company Interval 10600-12337 Core Lab 11772-11949 Core Lab 20820-21194 Please contact me at 564-5126 if you have any questions. Sincerely, Greater Point. Mclntyre Area RECEIVED AU G 1 ',t 1998 MS Enclosures Oil & Gas Cons, Anottorage Please sign below and return to Marian Sloan, BPX, Mail Stop MB9-4 for re t~ceipt~of transmi~).~~ttal. STATE OF ALASKA ( ALASKA'OIL AN OR RECOMPLETION REPORT AND ' D GAS CONSERVATION COMMISSION WELL COMPLETION 1. Status of Well Classification of Servic'~ I~ Oil F-~ Gas r-1 Suspended r-1 Abandoned [--I Service"~.~..,~..._?,~.. 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 97-256 3. Address 8. APl Number -"~, P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22852 4. Location of well at surface ."." ..... , ~,~'~"'-":'~,' 9. Unit or Lease Name 1394' NSL, 884' WEL, SEC. 36, T12N, ELBE, ua j --,-~--~.~ At top of productive interval ~ ~/"' ' 10. NiakUkwell Number 1235'At totalNSL'depth1857' EWL, SEC. 30, T12N, R16E, UM~,_.~_~'.'-~.;'.'. "'" !' i~i NK-62 1473' NSL, 1978' EWL, SEC. 30, T12N, R16E, UM ...... ' ................... '~' 11. Field and Pool Niakuk Oil Pool 5. Elevation in feet (indicate KB, DF, etc.) I 8. Lease Designation and Serial No. KBE = 59.8'I ADL 034635 , ,, ,. 12. Date Spudded 113. Date I.D. Reached I 14. Date Comp., Su,p., or ^band. IlS. Water depth, ,f offshore 116. No. of comPlefi0nS 1/5/08 1/20/08 2/13/08 N/A MSt.I One 12206 9536 FTI 12105 9471 FTI (~Yes I--INoI 2099, ~I 1000' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, LWD, CDR, ADH, Sonic/NEU/DEN, EFT, USIT/GR/CCL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 116' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 41' 5510' 12-1/4" 2270 sx PF 'E', 440 sx 'G', 50 sx PF 'C' 7" 26# L-80 38' 12190' 8-1/2" 400 sx Class 'G' ,., ., , 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 11649' 11551' MD TVD MD TVD · 11860'-11960' 9313'-9378' ~'6.' ' ACID, FRACTURE, CEMENT SQUEEZE, ETC. ,,, ,. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 240 bbls dieSel 27. PRODUCTION TEST [ "'~ ~' Date First Production I Method of Operation (Flowing, gas lift, etc.) ~,j ~. ~, I ~..~, I I ~i r--t i., Februar ! 15, 1998 I Gas Lift Date of Test Hours Tested PRODUCTION FOE OIL-EEL GAS-MCF WATER-BEE CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-EEL GAS-MCF WATER-BEE OIL GRAWTY-API (CORE) Press. 24-HOUR RATE ,. 28. CORE DATA ,, , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. ,,, HRZ 11411' 9019' Kuparuk 11779' 9260' Kuparuk 'E2' 11857' 9311' Kingak 11953' 9374' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I he re by ce rti f~_[he forel~~nd co rrect to the best of my kn ow ledge ///~' /. /'"" Signed '"''~St'/e~eve~u¥~'~''''~ Title Drilling Engineering Supervisor Date NK-62 97-256 Prepared By Name/Number: Kathy Carnpoamor, 564-5122 Well Number Permit No. / Approval No. ....... INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev, 07-01-80 CORE LABORATORIES BP EXPLORATION ALASKA, INC Niakuk No. NK-62 Well PrUdhoe Bay, Alaska Slabbed Core Photography (White & UV Light) Core 1 DePth: 11. 772. 0 - 11.843.8 feet Core 2 Depth: 11.844. 0 - 11.950. 0 feet t' ".,.;." · ' · "7; .. , .... ;~.:. ~"'. :..;;, ii:""~ · Performance Enquiry Report Operator BP Exploration Date 17:30, 15 Apr 98 Page 1 The analysis is from - 19:30, 12 Jan 98 - to - 19:30, 12 Jan 98 Programs in Result Table: NK-62 Well Type Time From Time To Duration DescriDtion E.M.W.(equivalent mud weight) NK-62 Event 19:30, 12 Jan 98 19:30, 12 Jan 98 0 hr 0 min Obtained leak off 14.2 Hole Size MDR 8-1/2 Facility Date/Time 02 Jan 98 03 Jan 98 04 Jan 98 05 Jan 98 06 Jan 98 07 Jan 98 08 1an 98 09 Jan 98 Progress Report NK Main Pad Well NK-62 Rig POOL 7 Page 1 Date 15 April 98 06:00-10:00 10:00-15:30 15:30-21:00 21:00-06:00 06:00-12:00 12:00-16:00 16:00-20:00 20:00-21:00 21:00-00:00 00:00-06:00 06:00-06:15 06:15-09:00 09:00-18:30 18:30-19:00 19:00-01:00 01:00-01:30 01:30-02:30 02:30-03:00 03:00-04:00 04:00-05:00 05:00-05:30 05:30-06:00 06:00-06:30 06:30-07:30 07:30-09:00 09:00-10:00 10:00-10:30 10:30-13:30 13:30-17:00 17:00-19:00 19:00-19:30 19:30-21:00 21:00-21:30 21:30-02:00 02:00-06:00 06:00-02:00 02:00-02:30 02:30-06:00 06:00-12:30 12:30-13:00 13:00-14:30 14:30-15:00 15:00-17:00 17:00-18:00 18:00-19:30 19:30-20:30 20:30-06:00 06:00-16:00 16:00-17:30 17:30-20:30 20:30-22:00 22:00-00:30 00:30-03:00 03:00-04:00 Duration 4hr 5-1/2 hr 5-1/2 hr 9 hr 6 hr 4hr 4hr 1 hr 3 hr 6 hr 1/4 hr 2-3/4 hr 9-1/2 hr 1/2 hr 6hr 1/2 hr lhr 1/2 hr lhr lhr 1/2 hr 1/2 hr 1/2 hr 1 hr 1-1/2 hr lhr 1/2 hr 3hr 3-1/2 hr 2hr 1/2 hr 1-1/2 hr 1/2 hr 4-1/2 hr 4 hr 20 hr 1/2 hr 3-1/2 hr 6-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 2hr lhr 1-1/2 hr 1 hr 9-1/2 hr 10hr 1-1/2 hr 3hr 1-1/2 hr 2-1/2 hr 2-1/2 hr lhr Activity Skid rig Rig moved 0.00 % Rig moved 75.00 % Repaired Handling equipment Repaired Handling equipment (cont...) Rig moved 95.00 % Repaired Additional services Rig moved 100.00 % Skid rig Installed Casing head Installed Casing head (cont...) Rigged up Drillfloor / Derrick Rigged up Divertor Tested Divertor Made up BHA no. 1 Circulated at 60.0 ft Rigged up Survey wireline unit Drilled to 115.0 ft Took MWD survey at 75.0 ft Pulled out of hole to 0.0 ft R.I.H. to 115.0 ft Took Gyro survey at 100.0 ft Took Gyro survey at 100.0 ft (cont...) Pulled BHA Made up BHA no. 0 Took Gyro survey at 100.0 ft Pulled BHA Made up BHA no. 0 Milled Conductor at 116.0 ft Pulled BHA R.I.H. to 116.0 ft Drilled to 206.0 ft Circulated at 206.0 ft Circulated at 116.0 ft Drilled to 453.0 ft Drilled to 453.0 ft (cont...) Serviced Mud shakers Drilled to 2460.0 ft Drilled to 3064.0 ft Circulated at 3064.0 ft Took Gyro survey at 2954.0 ft Circulated at 3064.0 ft Pulled out of hole to 205.0 ft Pulled BHA Made up BHA no. 2 R.I.H. to 3064.0 ft Drilled to 4376.0 ft Drilled to 5524.0 ft (cont...) Circulated at 5524.0 ft Pumped out of hole to 2876.0 ft R.I.H. to 5524.0 ft Circulated at 5524.0 ft Pulled out of hole to 1098.0 ft Laid down 740.0 ft of 5-1/2in OD drill pipe Facility Date/Time 10 Jan 98 11 Jan 98 12 Jan 98 13 Jan 98 14 Jan 98 15 Jan 98 16 Jan 98 NK Main Pad Progress Report Well NK-62 Rig POOL 7 Page Date Duration Activity 04:00-06:00 06:00-06:30 06:30-09:00 09:00-16:00 16:00-17:00 17:00-20:30 20:30-00:00 00:00-01:00 O1:00-02:00 02:00-03:30 03:30-05:30 05:30-06:00 06:00-07:00 07:00-13:00 13:00-00:00 00:00-01:00 01:00-05:00 05:00-06:00 06:00-20:00 20:00-22:00 22:00-00:00 00:00-01:00 O1:00-04:00 04:00-04:30 04:30-05:30 05:30-06:00 06:00-07:00 07:00-08:00 08:00-13:30 13:30-17:30 17:30-18:00 18:00-19:30 18:00-19:00 19:00-20:00 20:00-20:30 20:30-06:00 06:00-18:30 18:30-19:30 19:30-21:30 21:30-22:30 22:30-00:00 00:00-03:00 03:00-04:30 04:30-05:00 05:00-06:00 06:00-06:30 06:30-06:00 06:00-06:30 06:30-09:00 09:00-09:30 09:30-18:00 18:00-20:00 20:00-23:00 23:00-01:30 2 hr 112 hr 2-1/2 hr 7 hr lhr 3-1/2 hr 3-1/2 hr lhr 1 hr 1-1/2 hr 2 hr 1/2 hr lhr 6hr llhr lhr 4 hr 1 hr 14 hr 2hr 2hr lhr 3 hr 1/2 hr lhr 1/2 hr 1 hr 1 hr 5-1/2 hr 4hr 1/2 hr 1-1/2 hr lhr lhr 1/2 hr 9-1/2 hr 12-1/2 hr lhr 2hr lhr 1-1/2 hr 3 hr 1-1/2 hr 1/2 hr lhr 1/2 hr 23-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 8-1/2 hr 2 hr 3 hr 2-1/2 hr Pulled BHA Pulled BHA (cont...) Rigged up Casing handling equipment Ran Casing to 3500.0 ft (9-5/8in OD) Circulated at 3500.0 ft Ran Casing to 5510.0 ft (9-5/8in OD) Circulated at 5510.0 ft Mixed and pumped slurry - 272.000 bbl Displaced slurry - 411.000 bbl Functioned DV collar Mixed and pumped slurry - 705.000 bbl Displaced slurry - 154.000 bbl Rigged down Casing handling equipment Rigged down Divertor Rigged up BOP stack Removed Handling equipment Tested Well control Repaired Top drive Repaired Top drive (cont...) Made up BHA no. 3 Singled in drill pipe to 2026.0 ft Drilled installed equipment - DV collar Singled in drill pipe to 5408.0 ft Circulated at 5408.0 ft Serviced Fluid system Circulated at 5410.0 ft Circulated at 5410.0 ft (cont...) Tested Casing - Via annulus and string Serviced Fluid system Drilled cement to 5550.0 ft Circulated at 5550.0 ft Performed formation integrity test Circulated at 8116.0 ft Pulled out of hole to 6560.0 ft R.I.H. to 8116.0 ft Drilled to 9278.0 ft Drilled to 10592.0 ft (cont...) Circulated at 10592.0 ft Pulled out of hole to 7978.0 ft R.I.H. to 10592.0 ft Circulated at 10592.0 ft Serviced Fluid system Circulated at 10592.0 ft Cleared Sand traps Circulated at 10592.0 ft Circulated at 10592.0 ft Drilled to 11745.0 ft Drilled to 11758.0 ft (cont...) Circulated at 11758.0 ft Rest hole at 11760.0 ft Pulled out of hole to 218.0 ft Pulled BHA Made up BHA no. 4 R.I.H. to 5500.0 ft 2 15 April 98 Facility Date/Time 17 Jan 98 18 Jan 98 19 Jan 98 20 Jan 98 21 Jan 98 22 Jan 98 Progress Report NK Main Pad Well NK-62 Rig POOL 7 Page 3 Date 15 April 98 01:30-02:00 02:00-03:00 03:00-06:00 06:00-06:30 06:30-08:00 08:00-11:00 11:00-13:00 13:00-18:00 18:00-20:00 20:00-20:30 20:30-21:30 21:30-00:00 00:00-01:00 01:00-01:30 01:30-03:00 03:00-05:00 05:00-05:30 05:30-06:00 06:00-10:00 10:00-12:00 12:00-18:00 18:00-20:00 20:00-03:00 03:00-04:30 04:30-06:00 06:00-06:30 06:30-07:00 07:00-13:00 13:00-17:30 17:30-18:00 18:00-20:30 20:30-21:00 21:00-23:30 23:30-03:30 03:30-06:00 06:00-07:00 07:00-09:00 09:00-18:00 18:00-19:30 19:30-20:00 20:00-00:00 00:00-03:00 03:00-06:00 06:00-10:00 10:00-13:00 13:00-00:00 00:00-01:00 O1:00-02:00 02:00-04:00 04:00-05:30 05:30-06:00 06:00-08:00 08:00-11:30 11:30-16:30 Duration 1/2 hr 1 hr 3hr 1/2 hr 1-1/2 hr 3 hr 2 hr 5 hr 2 hr 1/2 hr lhr 2-1/2 hr 1 hr 1/2 hr 1-1/2 hr 2 hr 1/2 hr 1/2 hr 4hr 2hr 6hr 2 hr 7 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 6hr 4-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 4 hr 2-1/2 hr lhr 2hr 9hr 1-1/2 hr 1/2 hr 4hr 3hr 3 hr 4 hr 3 hr llhr lhr lhr 2hr 1-1/2 hr 1/2 hr 2hr 3-1/2 hr 5hr Activity Serviced Drillfloor / Derrick Serviced Block line R.I.H. to 10890.0 ft R.I.H. to 11760.0 ft (cont...) Circulated at 11760.0 ft Cored to 11844.0 ft ~,/" Circulated at 11844.0 ft Pulled out of hole to 2500.0 ft Pulled out of hole to 604.0 ft Held safety meeting Pulled BHA Laid out Aluminium sleeve core Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 5 R.I.H. to 5510.0 ft Circulated at 5510.0 ft R.I.H. to 6500.0 ft R.I.H. to 11848.0 ft (cont...) Circulated at 11848.0 ft Cored to 11998.0 ft" Circulated at 11998.0 ft Pulled out of hole to 2500.0 ft Laid out Aluminium sleeve core,,'" Pulled BHA Pulled BHA Rigged down %s Tested Well control Made up BHA no. 6 Singled in drill pipe to 1250.0 ft R.I.H. to 5510.0 ft Circulated at 5510.0 ft R.I.H. to 11644.0 ft Reamed to 11998.0 ft Drilled to 12120.0 ft Drilled to 12206.0 ft (cont...) Circulated at 12206.0 ft Pulled out of hole to 394.0 ft Pulled BHA Held safety meeting Rigged up Logging/braided cable equipment Conducted electric cable operations Repaired Logging/braided cable equipment Repaired Logging/braided cable equipment (cont...) Rigged up Logging/braided cable equipment R.I.H. to 9769.0 ft Circulated at 9769.0 ft Rigged up sub-surface equipment - Other sub-surface equipment R.I.H. to 9743.0 ft Ran logs on tubulars Repaired Generator Ran logs on tubulars Repaired Logging/braided cable equipment Ran logs on tubulars Facility Date/Time 23 Jan 98 24 Jan 98 25 Jan 98 26 Jan 98 27 Jan 98 28 Jan 98 Progress Report NK Main Pad Well NK-62 Page 4 Rig POOL 7 Date 15 April 98 16:30-17:30 17:30-00:00 00:00-03:00 03:00-04:30 04:30-06:00 06:00-07:00 07:00-09:00 09:00-12:00 12:00-13:00 13:00-13:30 13:30-17:30 17:30-18:00 18:00-18:30 18:30-20:00 20:00-22:00 22:00-00:00 00:00-06:00 06:00-13:00 13:00-15:00 15:00-03:00 03:00-04:30 04:30-05:30 05:30-06:00 06:00-10:00 10:00-19:00 19:00-20:00 20:00-22:00 22:00-23:00 23:00-01:30 01:30-02:30 02:30-05:30 05:30-06:00 06:00-09:30 09:30-11:00 11:00-12:00 12:00-14:30 14:30-16:30 16:30-17:00 17:00-20:00 20:00-22:00 22:00-00:00 00:00-06:00 06:00-13:00 13:00-14:00 14:00-15:00 15:00-22:00 22:00-06:00 06:00-08:00 08:00-09:30 09:30-11:00 11:00-14:00 14:00-21:30 Duration lhr 6-1/2 hr 3 hr 1-1/2 hr 1-1/2 hr 1 hr 2 hr 3 hr 1 hr 1/2 hr 4hr 1/2 hr 1/2 hr 1-1/2 hr 2hr 2hr 6 hr 7hr 2hr 12hr 1-1/2 hr lhr 1/2 hr 4hr 9hr lhr 2 hr lhr 2-1/2 hr lhr 3hr 1/2 hr 3-1/2 hr 1-1/2 hr lhr 2-1/2 hr 2 hr 1/2 hr 3hr 2hr 2hr 6hr 7 hr 1 hr lhr 7hr 8hr 2hr 1-1/2 hr 1-1/2 hr 3 hr 7-1/2 hr Activity Ran logs on tubulars Ran logs on tubulars Ran logs on tubulars Rigged down Logging/braided cable equipment Pulled out of hole to 8000.0 ft Pulled out of hole to 5500.0 ft (cont...) Serviced Block line Pulled out of hole to 120.0 ft Rigged down Logging/braided cable equipment Serviced Drillfloor / Derrick Made up BHA no. 7 R.I.H. to 1400.0 ft Circulated at 1400.0 ft R.I.H. to 5510.0 ft Circulated at 5510.0 ft R.I.H. to 10350.0 ft Logged hole with LWD: Formation evaluation (prE) from 11035.0 ft to 10350.0 ft Logged hole with LWD: Formation evaluation (FE) from 11035.0 ft to 12206.0 ft (cont...) Circulated at 12206.0 ft Laid down 11860.0 ft of 5-1/2in OD drill pipe Pulled BHA Serviced Drillfloor / Derrick Removed Wear bushing Rigged up Casing handling equipment Ran Casing to 5510.0 ft (7in OD) Circulated at 5510.0 ft Ran Casing to 7500.0 ft (7in OD) Circulated at 7500.0 ft Ran Casing to 10000.0 ft (7in OD) Circulated at 10000.0 ft Ran Casing to 11773.0 ft (Tin OD) Installed Casing hanger & seal assembly running tool Circulated at 12190.0 ft Mixed and pumped slurry - 82.000 bbl Displaced slurry - 463.000 bbl Rigged down Cement unit Installed Seal assembly Installed Wear bushing Rigged up Drillstring handling equipment Rigged up Drillstring handling equipment Made up BHA no. 8 Singled in drill pipe to 6500.0 ft Singled in drill pipe to 12104.0 ft (cont...) Circulated at 12104.0 ft Tested Casing - Via annulus and string Circulated at 12104.0 ft Laid down 10200.0 ft of 4in OD drill pipe Laid down 11800.0 ft of 4in OD drill pipe (cont...) Pulled BHA Rigged up Logging/braided cable equipment Conducted electric cable operations Conducted electric cable operations Facility Date/Time 29 Jan 98 30 Jan 98 Progress Report NK Main Pad Well NK-62 Page 5 Rig POOL 7 Date 15 April 98 21:30-22:00 22:00-22:30 22:30-00:00 00:00-05:30 05:30-06:00 06:00-11:00 11:00-12:00 12:00-15:00 15:00-16:30 16:30-17:00 17:00-21:00 21:00-00:00 00:00-00:30 00:30-04:30 04:30-05:30 05:30-06:00 06:00-07:00 07:00-08:00 08:00-09:00 Duration 1/2 hr 1/2 hr 1-1/2 hr 5-1/2 hr 1/2 hr 5hr lhr 3hr 1-1/2 hr 1/2 hr 4 hr 3 hr 1/2 hr 4 hr lhr 1/2 hr 1 hr 1 hr lhr Activity Rigged down Logging/braided cable equipment Removed Wear bushing Rigged up Completion string handling equipment Ran Tubing to 4300.0 ft (4-1/2in OD) Repaired Completion string handling equipment Ran Tubing to 9550.0 ft (4-1/2in OD) Rigged up High pressure lines Ran Tubing to 11650.0 ft (4-1/2in OD) Installed Tubing hanger Rigged up sub-surface equipment - Completion equipment Rigged down BOP stack Installed Xmas tree Retrieved Accessories Circulated at 11650.0 ft Set packer at 11551.0 ft with 2100.0 psi Tested Tubing Tested Tubular strings - Via annulus Rigged down High pressure lines Installed Hanger plug PRUDHOE BAY, ALASKA To: PBU Reports Group From: K. Bulloch and L. Phong Well Name: Niakuk-62 Main Category: Initial Perfs Sub Category: Perfs Operation Date: 2/13/98 Date: 2/14/98 Capital AFE: 9335-070-xxx AFE: 731210 Job ID: NK62001 Objective: To shoot initial perforations in Niakuk 62 from 11,860' to 11,960', and open the well to limited timed flows into an open tank. Operations Summary: Ran in hole GR/CCL to tie in depths, shot guns and repeated for each of the four gun runs. Job Los II OPERATION II 2/13198 1100 Safety Meeting, MIRU, Ambient Temp. -32 Deg. F, Pressure test lines. IAP = Off, OAP = og, WHT = Ambient. 1330 RIH w/20' guns, GR, and CCL. Tie in, No need to leave well freeze protected, informed by pad operator that well would be put on line upon completion of perforating. 1615 Shoot 11,960' to 11,940' 110og underbalaneed. Lost 20og on wireline. 5 minute SIWHP 710g and stabilising. Open well to flow 5 minutes. FWHP 62og. 1730 POOH All shots off. RIH with 30'guns SIWHP 68og. Tie in with well cracked open. FWHP 60og. 1925 Shoot 11,940' to 11,910', Lost 114g on wireline. SI. SIWHP 92og 2115 POOH, all shots off. Inspect site. RD for the night. 2/14/98 0800 Safety Meeting, RU, Ambient Temp. -36 Deep. F. 0830 Open well to test flow for 15 minutes. FWHP 65og. SI 0940 RIH with 30' ~uns. Crack well open to underbalance. Tie in. 1145 Shoot 30' guns 11,880' to 11,910'. Loss 8og on wireline. SI 1330 POOH. All shots off. Open well to flow 15 minutes. FWHP 77og. SI. 1445 RIH with 20' guns. Crack well open to underbalance. Tie in. 1650 Shoot 20' guns 11,860' to 11,880'. Loss 7og on wireline. SI POOH 1725 OOH. All shots off. Open well to flow 10 minutes. FWHP 64og SI As well was being shut in, some gas could be heard flowing through the flowhose. 1929 RDMO Inspect site, hand over well to pad operator. Perforating Summary_ Top shot Btm shot Gun OD Shot densit~ Orientation Phasing 11,960' 11,940' 2 7/8" 6 spf random 60 11,940' 11,91 O' 2 7/8" 6 spf random 60 11,910' 11,880' 2 7/8" 6 spf random 60 11,880' 11,860' 2 7/8" 6 spf random 60 Gun Run Fluid Level Fluid Level FWHP PSI BBIs Produced Flow Rate BPD Before After Per Flow Interval #1 11,960' to 30" 36' 620 9.9/5 minutes 2,878 11,940' varied choke 30 beans #2 11,940' to 44" 80" 650 59.9115 rain 5,757 11,910' varied choke 30 beans #3 11,910' to 89" 143" 770 89.9/15 rain 8,636 11,880' varied choke 30 to 50 beans g4 11,880' to 158" 200" 640 69.9/10 rain 10,0757 11,860' varied choke 30 to 50 beans 1" Fluid Level = 1.666 BB1 Ii B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Gyro Continuous Multishot Survey Inside 5.5" DRILL PiPE Survey date: 27-JANUARY, 1998 Job number :A0198GCE441 CONTENTS JOB NUMBER :A0198GCE441 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL $. EQUIPMENT AND CHRONOLOGICAL REPORT 1. DISCUSSION, SURVEY CERTIFICATION SHEET DISCUSSION JOB NUMBER · A0198GCE441 Tool 777 was run in WELL# NK-62 on SCHLUMBERGER 15/32" wireline inside 7"CASING. in combination with the USIT. The survey was completed without any problems. SURVEY CERTIFICATION SHEET JOB NUMBER: A0198GCE441 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the odginal data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER 2. SURVEY DETAILS SURVEY DETAILS JOB NUMBER: A0198GCE441 CLIENT: B.P. EXPLORATION RIG: SCHLUMBERGER LOCATION: NIAKUK FIELD, ALASKA WELL: NK-62 LATITUDE: 70.333 N LONGITUDE: 148.3 W SURVEY DATE: SURVEY TYPE : 28-JANUARY, 1998 GYRO CONTINUOUS MULTISHOT DEPTH REFERENCE: 59.8' MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 11999' SURVEY TIED ONTO: NA SURVEY INTERVAL: 0-11999' APl NUMBER: 050-029-22 TARGET DIRECTION: 28.67 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD 3. OUTRUN SURVEY LISTING A Gyrodat a Di rect ional Survey for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Run Date: 27-Jan-98 14:45:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.333000 deg. N Sub-sea Correction from Vertical Reference: 59.8 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 28.670 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyrodata B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet 0.0 0.00 0.00 0.0 100.0 .79 221.71 100.0 200.0 .82 226.72 200.0 299.0 .94 191.56 299.0 401.0 1.64 157.10 401.0 500.0 2.80 146.36 499.9 600.0 3.78 138.76 599.7 700.0 4.87 130.48 699.4 801.0 4.90 128.18 800.1 900.0 4.60 128.74 898.7 1000.0 4.37 125.67 998.4 1100.0 3.32 124.87 1098.2 1200.0 2.59 121.52 1198.1 1300.0 2.38 121.85 1298.0 1400.0 1.85 112.47 1397.9 1500.0 1.33 112.16 1497.9 1600.0 .60 48.70 1597.8 1700.0 .71 33.47 1697.8 1800.0 .62 43.99 1797.8 1899.0 .61 36.12 1896.8 2000.0 .48 48.42 1997.8 2100.0 .47 58.68 2097.8 2199.0 .41 72.26 2196.8 2299.0 .53 93.78 2296.8 2399.0 .63 103.13 2396.8 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 0.0 0.00 0.0 0.0 -.7 .79 .7 221.7 -2.0 .08 2.1 223.4 -3.5 .55 3.5 217.1 -5.2 1.00 5.3 199.0 -7.2 -9.5 -11.5 -13.0 -14.4 -15.6 -16.4 -16.8 -17.0 -17.0 -16.7 -16.0 -14.9 -13.8 -12.8 -11.8 -11.1 -10.5 -10.0 -9.7 1.24 8.3 178.8 1.07 13.3 163.9 1.26 20.2 153.2 .20 28.3 146.1 .31 36.2 142.2 .33 43.8 139.6 .05 50.3 137.7 .75 55.3 136.4 .21 59.5 135.3 .63 63.0 134.3 .52 65.6 133.4 .19 66.7 132.6 .21 66.7 131.6 .15 66.6 130.6 .09 66.6 129.7 .17 66.7 128.9 .08 66.9 128.2 .12 67.2 127.6 .21 67.8 127.2 · 14 68 . 7 126 . 8 Survey HORIZONTAL COORDINATES feet 0.00 N 0.00 E .51 S .46 W 1.52 S 1.44 W 2.80 S 2.12 W 4.97 S 1.71 W 8.29 S .18 E 12.81 S 3.71 E 18.04 S 9.11 E 23.49 S 15.76 E 28.59 S 22.18 E 33.32 S 28.40 E 37.19 S 33.87 E 40.02 S 38.16 E 42.30 S 41.85 E 44.01 S 45.10 E 45.06 S 47.66 E 45.15 S 49.13 E 44.29 S 49.87 E 43.38 S 50.59 E 42.57 S 51.27 E 41.86 S 51.90 E 41.37 S 52.56 E 41.05 S 53.25 E 40.97 S 54.05 E 41.13 S 55.04 E Page A Gyrodat a Direc t ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 2500.0 .50 105.13 2497.8 2600.0 .30 43.38 2597.8 2700.0 .43 37.77 2697.8 2800.0 .49 62.26 2797.8 2901.0 .60 79.60 2898.8' -9.4 -9.1 -8.4 -7.7 -7.0 .13 69.6 126.4 .44 70.1 126.1 .13 70.1 125.6 .20 70.3 125.0 .19 70.9 124.4 41.37 S 56.01 E 41.29 S 56.61 E 40.80 S 57.02 E 40.30 S 57.63 E 40.01 S 58.53 E 3000.0 1.14 41.20 2997.8 3099.0 1.25 36.85 3096.8 3200.0 1.98 32.42 3197.7 3299.0 2.90 30.73 3296.6 3399.0 4.21 28.17 3396.4 -5 -3 .7 .7 .9 .3 .5 78 71.4 123.3 14 71.6 121.6 73 71.8 119.4 93 72.1 116.0 32 72.7 111.1 39.17 S 59.69 E 37.56 S 60.99 E 35.20 S 62.59 E 31.61 S 64.78 E 26.21 S 67.81 E 3500.0 5.78 28.23 3497.0 3600.0 7.89 28.72 3596.3 3700.0 10.08 28.03 3695.'1 3800.0 12.02 29.63 3793.2 3900.0 14.51 26.91 3890.6 3950.0 16.05 26.14 3938.8 4000.0 16.96 26.24 3986.7 4050.0 17.85 27.17 4034.4 4100.0 19.28 27.49 4081.8 4150.0 20.58 27.11 4128.8 18 30 45 65 87 101 115 130 146 163 .3 .2 .8 .0 .9 .1 .3 .2 .1 .2 I . 2. 2. 1. 2. . 1. 1. 2. 2. 55 74.3 104.4 11 78.1 95.9 19 85.2 86.1 96 97.0 76.6 57 113.5 67.9 12 123.7 63.8 82 135.2 60.2 86 147.9 57.0 86 161.9 54.2 62 177.3 51.7 18.46 S 71.96 E 8.01 S 77.64 E 5.73 N 85.05 E 22.51 N 94.31 E 42.73 N 105.12 E 54.52 N 111.00 E 67.27 N 117.27 E 80.63 N 124.00 E 94.77 N 131.31 E 109.91 N 139.12 E 4200.0 22.10 27.31 4175.4 4250.0 23.25 27.54 4221.5 4300.0 24.90 28.28 4267.2 4350.0 26.12 28.49 4312.3 4400.0 27.15 28.10 4357.0 181.4 200.6 221.0 242.6 265.0 . 2. 3. 2. 2. 05 194.0 49.5 29 212.0 47.5 37 231.3 45.8 43 251.9 44.3 09 273.6 43.0 126.10 N 147.44 E 143.21 N 156.32 E 161.23 N 165.87 E 180.17 N 176.11 E 199.91 N 186.73 E A Gyrodat a Directional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 4450.0 27.98 28.16 4401.3 4500.0 29.68 28.19 4445.1 4550.0 30.85 27.97 4488.3 4600.0 32.61 27.69 4530.9 4650.0 34.06 27.39 4572.6 288.1 312.2 337.4 363.7 391.2 1.66 296.0 41.9 3.41 319.4 40.9 2.35 344.1 39.9 3.53 369.8 39.1 2.92 396.8 38.3 220.31 N 197.64 E 241.56 N 209.02 E 263.79 N 220.88 E 287.05 N 233.16 E 311.41 N 245.86 E 4700.0 35.49 27.00 4613.7 4750.0 36.29 26.45 4654.2 4800.0 37.78 25.72 4694.1 4850.0 38.92 25.14 4733.3 4900.0 40.86 24.47 4771.7 419.7 449.0 479.1 510.0 542.0 2.89 424.8 37.6 1.73 453.6 36.9 3.11 483.2 36.2 2.39 513.7 35.5 3.97 545.3 34.9 336.78 N 362.95 N 390.00 N 418.02 N 447.13 N 258.89 E 272.07 E 285.31 E 298.63 E 312.07 E 4950.0 42.36 24.82 4809.1 5000.0 43.54 25.31 4845.7 5050.0 45.19 26.41 4881.4 5100.0 46.32 27.38 4916.3 5150.0 47.20 27.66 4950.6 5200.0 47.23 27.67 4984.5 5250.0 47.27 27.90 5018.4 5300.0 47.94 27.86 5052.2 5350.0 49.70 27.53 5085.1 5400.0 50.27 27.62 5117.2 575.2 609.2 644.1 679.9 716.3 753.0 789.7 826.6 864.2 902.5 3.05 578.0 34.3 2.44 611.6 33.8 3.64 646.3 33.4 2.66 681.9 33.0 1.81 718.1 32.8 .07 754.7 32.5 .34 791.3 32.3 1.34 828.1 32.1 3.55 865.6 31.9 1.14 903.8 31.7 477.31 N 508.16 N 539.62 N 571.56 N 603.86 N 636.36 N 668.85 N 701.49 N 734.81 N 768.75 N 325.92 E 340.35 E 355.61 E 371.81 E 388.64 E 405.68 E 422.80 E 440.07 E 457.56 E 475.29 E 5450.0 50.16 27.57 5149.2 5500.0 50.07 27.43 5181.3 5550.0 49.84 27.19 5213.5 5600.0 49.67 26.87 5245.8 5650.0 49.61 26.57 5278.1 940.9 979.3 1017.6 1055.7 1093.8 .23 942.1 31.6 .28 980.4 31.4 .59 1018.6 31.2 .59 1056.7 31.1 .47 1094.7 30.9 802.80 N 836.84 N 870.85 N 904.84 N 938.87 N 493.09 E 510.81 E 528.37 E 545.71 E 562.84 E A Gyrodat a Di rec t ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 5700.0 49.56 26.41 5310.6 5750.0 49.58 26.39 5343.0 5800.0 49.68 26.34 5375.4 5850.0 49.61 26.35 5407.7 5900.0- 49.40 26.21 5440.2 1131.8 1169.9 1207.9 1246.0 1284.0 .27 1132.6 30.8 .06 1170.6 30.6 .20 1208.6 30.5 .13 1246.6 30.4 .48 1284.5 30.3 972.94 N 579.82 E 1007.03 N 596.74 E 1041.17 N 613.66 E 1075.31 N 630.57 E 1109.40 N 647.40 E 5950.0 49.61 27.59 5472.7 6000.0 49.86 29.14 5505.0 6050.0 50.43 29.42 5537.0 6100.0 50.24 29.62 5568.9 6150.0 50.29 29.81 5600.9 1322.0 1360.1 1398.5 1437.0 1475.5 . 14 1322.4 30.2 42 1360.6 30.1 22 1399.0 30.1 49 1437.4 30.1 31 1475.9 30.1 1143.31 N 1176.88 N 1210.36 N 1243.85 N 1277.25 N 664.61 E 682.74 E 701.51 E 720.48 E 739.54 E 6200.0 50.00 30.12 5633.0 6250.0 49.91 30.39 5665.1 6300.0 49.78 30.67 5697.4 6350.0 49.78 30.81 5729.7 6400.0 50.38 29.35 5761.7 6450.0 51.12 28.77 5793.4 6500.0 51.06 27.73 5824.8 6550.0 50.79 27.39 5856.3 6600.0 50.58 27.65 5888.0 6650.0 50.37 28.23 5919.8 1513.8 1552.1 1590.3 1628.4 1666.8 1705.5 1744.4 1783.2 1821.9 1860.4 . · . . 75 1514.3 30.1 45 1552.6 30.1 51 1590.8 30.1 21 1628.9 30.1 55 1667.3 30.1 74 1706.0 30.1 62 1744.9 30.0 76 1783.7 30.0 58 1822.3 29.9 98 1860.9 29.9 1310.50 N 1343.56 N 1376.48 N 1409.29 N 1442.47 N 1476.32 N 1510.59 N 1545.00 N 1579.30 N 1613.38 N 758.71 E 778.00 E 797.41 E 816.93 E 836.14 E 854.95 E 873.36 E 891.32 E 909.20 E 927.27 E 6700.0 50.56 28.72 5951.6 6750.0 50.46 28.88 5983.4 6800.0 50.22 29.03 6015.3 6850.0 49.73 29.28 6047.5 6900.0 49.28 29.62 6080.0 1899.0 1937.6 1976.1 2014.4 2052.4 85 1899.4 29.9 32 1938.0 29.8 53 1976.5 29.8 05 2014.8 29.8 04 2052.8 29.8 1647.28 N 1681.09 N 1714.77 N 1748.21 N 1781.32 N 945.66 E 964.25 E 982.88 E 1001.54 E 1020.23 E A Gyrodata B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Directional Survey Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 6950.0 48.92 29.83 6112.7 7000.0 48.80 29.80 6145 . 6 7050.0 48 . 64 29.73 6178.6 7100 . 0 48 . 29 29.84 6211 . 7 7150.0 48.53 28.76 6244.9 2090.2 2127.8 2165.4 2202.8 2240.2 .79 2090.6 29.8 .24 2128.2 29.8 .34 2165.8 29.8 .72 2203.2 29.8 1.68 2240.6 29.8 1814.13 N 1846.81 N 1879.42 N 1911.91 N 1944.52 N 1038.97 E 1057.69 E 1076.34 E 1094.94 E 1113.24 E 7200.0 49.37 28.06 6277.8 7250.0 49.52 28.35 6310.3 7300.0 49.54 28.06 6342.7 7350.0 49.99 27.83 6375.0 7400.0 50.44 28.69 6407.0 2277.9 2315.9 2353.9 2392.1 2430.5 1.98 2278.3 29.8 .53 2316.3 29.7 .44 2354.3 29.7 .98 2392.5 29.7 1.60 2430.9 29.7 1977.69 N 2011.16 N 2044.68 N 2078.40 N 2112.24 N 1131.18 E 1149.13 E 1167.11 E 1185.00 E 1203.19 E 7450.0 50.63 28.78 6438.8 7500.0 50.47 28.65 6470.6 7550.0 50.39 28.45 6502.4 7600.0 50.28 28.35 6534.3 7650.0 50.26 28.17 6566.3 7700.0 50.33 28.00 6598.2 7750.0 50.20 27.86 6630.2 7800.0 50.24 27.62 6662.2 7850.0 50.27 27.55 6694.1 7900.0 50.14 27.35 6726.1 2469.1 2507.7 2546.3 2584.8 2623.2 2661.7 2700.1 2738.6 2777.0 2815.4 .40 2469.5 29.7 .39 2508.1 29.6 .34 2546.6 29.6 .26 2585.1 29.6 .28 2623.6 29.6 .29 2662.0 29.6 .35 2700.4 29.5 .37 2738.8 29.5 .13 2777.3 29.5 .41 2815.7 29.5 2146.09 N 2179.95 N 2213.80 N 2247.66 N 2281.53 N 2315.47 N 2349.44 N 2383.45 N 2417.52 N 2451.62 N 1221.75 E 1240.30 E 1258.72 E 1277.03 E 1295.24 E 1313.35 E 1331.36 E 1349.25 E 1367.05 E 1.384.76 E 7950.0 50.20 27.21 6758.2 8000.0 50.07 27.09 6790.2 8050.0 50.02 26.96 6822.3 8100.0 49.97 26.86 6854.5 8150.0 50.04 26.75 6886.6 2853.8 2892.2 2930.5 2968.7 3007.0 .25 2854.0 29.4 .31 2892.4 29.4 .23 2930.7 29.4 .18 2969.0 29.3 .21 3007.2 29.3 2485.75 N 2519.90 N 2554.04 N 2588.19 N 2622.38 N 1402.36 E 1419.87 E 1437.28 E 1454.62 E 1471.89 E A Gyrodata B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet 8200.0 50.05 26.66 6918.7 8250.0 49.89 26.56 6950.9 8300.0 49.88 26.51 6983.1 8350.0 49.97 26.46 7015.3 8400.0 50.08 26.28 7047.4 8450.0 50.18 26.10 7079.5 8500.0 50.07 26.01 7111.5 8550.0 49.96 25.87 7143.6 8600.0 49.99 25.78 7175.8 8650.0 50.26 26.55 7207.9 8700.0 50.40 27.31 7239.8 8750.0 50.29 28.23 7271.7 8800.0 50.32 28.07 7303.6 8850.0 50.32 27.97 7335.6 8900.0 50.19 27.82 7367.5 8950.0 50.28 27.59 7399.5 9000.0 50.02 27.50 7431.5 9050.0 49.92 27.36 7463.7 9100.0 49.92 27.19 7495.9 9150.0 49.81 26.94 7528.1 9200.0 49.76 26.81 7560.4 9250.0 49.69 26.74 7592.7 9300.0 49.60 26.62 7625.1 9350.0 49.74 26.49 7657.5 9400.0 49.63 26.42 7689.8 3045.3 3083.6 3121.8 3160.0 3198.3 3236.7 3275.0 3313.3 3351.5 3389.8 3428.3 3466.8 3505.3 3543.7 3582.2 3620.6 3659.0 3697.3 3735.5 3773.7 3811.9 3850.0 3888.1 3926.2 3964.3 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. .14 3045.5 29.3 .35 3083.7 29.2 .07 3121.9 29.2 .19 3160.2 29.2 .37 3198.4 29.1 .33 3236.8 29.1 .26 3275.1 29.1 .30 3313.3 29.0 .15 3351.6 29.0 .31 3389.9 29.0 .21 3428.3 28.9 .43 3466.8 28.9 .26 3505.3 28.9 .16 3543.8 28.9 .34 3582.2 28.9 .39 3620.6 28.9 .54 3659.0 28.9 .30 3697.3 28.9 .26 3735.5 28.8 .44 3773.7 28.8 .23 3811.9 28.8 .17 3850.0 28.8 .27 3888.1 28.8 .35 3926.2 28.7 .24 3964.3 28.7 Survey HORIZONTAL COORDINATES feet 2656.62 N 1489.12 E 2690.85 N 1506.26 E 2725.06 N 1523.35 E 2759.30 N 1540.41 E 2793.63 N 1557.43 E 2828.07 N 2862.54 N 2896.99 N 2931.45 N 2965.89 N 1574.36 E 1591.21 E 1607.97 E 1624.65 E 1641.57 E 3000.21 N 3034.26 N 3068.19 N 3102.16 N 3136.13 N 1659.00 E 1676.93 E 1695.08 E 1713.16 E 1731.14 E 3170.16 N 3204.19 N 3238.17 N 3272.18 N 3306.22 N 1749.01 E 1766.77 E 1784.40 E 1801.93 E 1819.32 E 3340.27 N 3374.33 N 3408.37 N 3442.47 N 3476.60 N 1836.58 E 1853.77 E 1870.88 E 1887.92 E 1904.90 E Page A Gyrodat a Direc t ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES feet 9450.0 49.72 26.31 7722.2 9500.0 49.49 26.32 7754.6 9550.0 49.43 26.20 7787.1 9600.0 49.52 26.04 7819.6 9650.0 49.40 25.98 7852.1 4002.4 4040.4 4078.4 4116.3 4154.3 .24 4002.4 28.7 .45 4040.4 28.7 .22 4078.4 28.7 .30 4116.3 28.6 .26 4154.3 28.6 3510.76 N 3544.89 N 3578.97 N 3613.09 N 3647.24 N 1921.83 E 1938.71 E 1955.53 E 1972.26 E 1988.92 E 9700.0 49.36 25.91 7884.6 9750.0 49.18 25.70 7917.2 9800.0 49.03 25.48 7950.0 9850.0 48.99 25.41 7982.8 9900.0 48.72 26.31 8015.7 4192.2 4230.0 4267.8 4305.5 4343.1 · e e . 1. 15 4192.2 28.6 46 4230.1 28.6 46 4267.8 28.5 13 4305.5 28.5 46 4343.1 28.5 3681.37 N 3715.48 N 3749.57 N 3783.65 N 3817.53 N 2005.53 E 2022.02 E 2038.35 E 2054.56 E 2070.99 E 9950.0 48.63 26.41 8048.7 10000.0 48.59 26.15 8081.8 10050.0 48.33 25.87 8114.9 10100.0 48.32 25.63 8148.1 10150.0 48.13 25.26 8181.5 10200.0 49.14 25.62 8214.5 10250.0 49.78 25.70 8247.0 10300.0 49.70 25.55 8279.3 10350.0 49.68 25.30 8311.7 10400.0 49.61 25.03 8344.0 4380.6 4418.1 4455.5 4492.8 4530.0 4567.4 4605.4 4643.5 4681.6 4719.6 .22 4380.6 28.5 .39 4418.1 28.4 .67 4455.5 28.4 .37 4492.8 28.4 .67 4530.0 28.4 2.10 4567.5 28.4 1.27 4605.5 28.3 .27 4643.6 28.3 .38 4681.7 28.3 .44 4719.7 28.3 3851.17 N 3884.80 N 3918.44 N 3952.08 N 3985.75 N 4019.64 N 4053.89 N 4088.29 N 4122.73 N 4157.21 N 2087.66 E 2104.26 E 2120.68 E 2136.90 E 2152.92 E 2169.04 E 2185.50 E 2202.00 E 2218.37 E 2234.57 E 10450.0 49.45 24.86 8376.5 10500.0 49.47 24.62 8409.0 10550.0 49.13 24.29 8441.6 10600.0 48.91 24.02 8474.4 10650.0 48.83 24.85 8507.3 4757.5 4795.5 4833.3 4870.9 4908.5 .40 4757.7 28.2 .37 4795.6 28.2 .84 4833.4 28.2 .60 4871.1 28.1 1.27 4908.7 28.1 4191.70 N 4226.21 N 4260.71 N 4295.16 N 4329.44 N 2250.61 E 2266.52 E 2282.21 E 2297.66 E 2313.24 E A Gyrodata B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet 10700.0 49.00 26.01 8540.1 10750.0 48.27 25.77 8573.2 10800.0 47.72 26.07 8606.6 10850.0 47.73 28.01 8640.3 10900.0 47.37 28.60 8674.0 10950.0 47.74 30.45 8707.8 11000.0 46.78 30.22 8741.7 11050 . 0 45 . 96 30 . 13 8776 . 2 11100.0 46.42 30.04 8810.8 11150.0 48.29 29.95 8844.7 11200.0 48.08 29.38 8878.0 11250.0 47.13 29.04 8911.7 11300.0 48.11 28.78 8945.4 11350.0 47.87 28.33 8978.9 11400.0 48.56 28.95 9012.2 11450.0 49.19 29.04 9045.1 11500.0 48.80 28.67 9077.9 11550.0 48.66 28.37 9110.9 11600.0 50.00 28.14 9143.5 11650.0 49.81 27.98 9175.7 11700.0 49.36 27.81 9208.1 11750.0 49.00 27.58 9240.8 11800.0 48.85 27.46 9273.6 11850.0 49.00 27.27 9306.5 11900.0 49.32 27.14 9339.2 4946.1 4983.6 5020.7 5057.6 5094.5 5131 5168 5204 5240 5277 5314 5351 5388 5425 5462 5500 5538 5575 5613 5651 5689 5727 5765 5803 5840 .4 .1 .3 .4 .2 .4 .3 .3 .4 .7 .4 .1 .7 .6 .8 .9 .7 .4 .1 .9 Directional DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 1.78 4946.3 28.1 1.50 4983.8 28.1 1.18 5021.0 28.1 2.88 5057.9 28.1 1.11 5094.8 28.1 2.83 5131.7 28.1 1.94 5168.4 28.1 1.64 5204.6 28.1 .91 5240.6 28.1 3.74 5277.4 28.1 .95 5314.6 28.1 1.96 5351.6 28.1 2.00 5388.5 28.1 .83 5425.6 28.2 1.66 5462.9 28.2 1.28 5500.6 28.2 .98 5538.3 28.2 .52 5575.9 28.2 2.70 5613.8 28.2 .45 5652.1 28.2 .95 5690.1 28.2 .78 5728.0 28.2 .37 5765.7 28.2 .41 5803.3 28.2 .67 5841.2 28.1 Survey HORIZONTAL COORDINATES feet 4363.48 N 2329.42 E 4397.24 N 2345.81 E 4430.65 N 2362.05 E 4463.60 N 2378.86 E 4496.08 N 2396.36 E 4528.19 N 2414.54 E 4559.88 N 2433.09 E 4591.17 N 2451.28 E 4622.39 N 2469.36 E 4654.24 N 2487.75 E 4686.62 N 4718.85 N 4751.18 N 4783..81 N 4816.53 N 4849.47 N 4882.52 N 4915.54 N 4948.95 N 4982.70 N 5016.35 N 5049.85 N 5083.28 N 5116.75 N 5150.39 N 2506.19 E 2524.21 E 2542.06 E 2559.82 E 2577.69 E 2595.95 E 2614.16 E 2632.10 E 2650.05 E 2668.05 E 2685.85 E 2703.44 E 2720.85 E 2738.18 E 2755.47 E Page A Gyrodat a Direc t ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: A0198GCE441 MEASURED I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 11950.0 49.62 27.02 9371.7 5878.9 .63 5879.2 28.1 11999.0 50.13 26.92 9403.2 5916.4 1.05 5916.6 28.1 5184.23 N 5217.62 N 2772.77 E 2789.76 E Final Station Closure: Distance: 5916.61 ft Az: 28.13 deg. Page A Gyrodat a Directional Survey for B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: SUB441 Run Date: 27-Jan-98 14:45:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.333000 deg. N Sub-sea Correction from Vertical Reference: 59.8 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 28.670 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a Di rec t ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NORTH SLOPE, ALASKA Job Number: SUB441 NK-62 Page SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DEPTH DEPTH SECTION feet deg. deg. feet feet DOGLEG SEVERITY deg. / 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet -59.8 0.00 100.0 .81 200.0 .89 300.0 1.36 400.0 2.33 500.0 3.39 600.0 4.44 700.0 4.89 800.0 4.72 900.0 4.46 0.00 224.70 205.47 171.01 150.71 141.80 133.77 129.10 128.52 126.86 0.0 159.8 259.8 359.8 459.8 559.8 659.8 759.8 859.8 959.8 0.0 -1.5 -2.9 -4.5 -6.4 -8.6 -10.7 -12.4 -13.9 -15.2 0.00 .36 .36 .82 1.14 : 1.14 1.18 .62 .26 .32 0.0 0.0 2.1 222.7 3.5 219.6 5.3 206.3 8.3 187.0 13.3 169.8 20.2 157.4 28.3 149.0 36.2 143.7 43.8 140.6 0.00 N 0.00 E 1.11 S 1.04 W 2.29 S 1.85 W 4.09 S 1.88 W 6.94 S .80 E 11.00 S 2.30 E 15.96 S 6.96 E 21.31 S 13.10 E 26.58 S 19.65 E 31.49 S 25.99 E 1000.0 3.72 1100.0 2.87 1200.0 2.46 1300.0 2.05 1400.0 1.52 125.18 122.80 121.73 116.05 112.28 1059.8 1159.8 1259.8 1359.8 1459.8 -16 -16 -16 -17 -16 .1 .6 .9 .0 .8 .77 .87 .42 .47 .56 50.3 138.4 55.3 136.9 59.5 135.7 63.0 134.7 65.6 133.7 35.70 S 31.76 E 38.94 S 36.52 E 41.43 S 40.44 E 43.36 S 43.86 E 44.66 S 46.69 E 1500.0 .88 1600.0 .67 1700.0 .66 1800.0 .61 1900.0 .52 72.84 39.26 39.99 39.06 43.79 1559.8 1659.8 1759.8 1859.8 1959.8 -16 -15 -14 -13 -12 .3 .4 .2 .1 .2 .93 .58 .17 .11 .14 66.7 132.9 66.7 132.0 66.6 131.0 66.6 130.0 66.7 129.2 45.12 S 48.57 E '~'~'- 44.62 S 49.59 E 43.72 S 50.31 E 42.87 S 51.02 E 42.13 S 51.66 E 2000.0 .47 2100.0 .43 2200.0 .48 2300.0 .59 2400.0 .55 54.78 67.18 85.81 99.67 104.37 2059.8 2159.8 2259.8 2359.8 2459.8 -11 -10 -10 -9 -9 .4 .7 .2 .8 .5 .12 .11 .18 .17 .13 66.9 128.5 67.2 127.8 67.8 127.3 68.7 126.9 69.6 126.6 41.56 S 52.31 E 41.17 S 52.99 E 41.00 S 53.75 E 41.07 S 54.67 E 41.28 S 55.64 E B.P. EXPLORATION NIAKUK FIELD, WELL NO. NORTH SLOPE, ALASKA Job Number: SUB441 A Gyro da t a NK-62 SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. 2500.0 .38 2600.0 .38 2700.0 .47 2800.0 .56 2900.0 .93 3000.0 1.21 3100.0 1.71 3200.0 2.55 3300.0 3.73 3400.0 5.20 3500.0 7.11 3600.0 9.29 3700.0 11.35 3800.0 13.72 3900.0 16.45 4000.0 18.61 4100.0 21.59 4200.0 24.64 4300.0 27.20 4400.0 30.08 66.84 39.90 52.96 72.91 55.93 38.47 34.08 31.36 29.11 28.21 Directional VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. 2559.8 -9.2 2659.8 -8.7 2759.8 -8.0 2859.8 -7.3 2959.8 -6.2 4500.0 33.61 4600.0 36.50 4700.0 40.26 4800.0 44.19 4900.0 47.21 3059.8 -4.5 3159.8 -1.9 3259.8 1.8 3359.8 7.3 3459.8 15.1 28.54 3559.8 25.8 28.28 3659.8 40.3 29.08 3759.8 58.5 27.77 3859.8 80.7 26.18 3959.8 107.3 27.34 4059.8 138.7 27.24 4159.8 175.3 28.16 4259.8 217.7 28.10 4359.8 266.4 28.12 4459.8 320.8 27.48 4559.8 382.8 26.35 4659.8 453.2 24.67 4759.8 532.1 25.75 4859.8 623.0 27.66 4959.8 726.3 .33 70.1 126.2 .25 70.1 125.8 .18 70.3 125.2 .20 70.9 124.6 .55 71.4 123.7 .38 71.6 122.2 .51 71.8 120.2 .85 72.1 117.3 1.18 72.7 112.9 1.47 74.3 106.9 1.91 78.1 99.0 2.16 85.2 89.6 2.04 97.0 79.8 2.38 113.5 70.6 2.55 135.2 62.2 2.40 161.9 55.5 2.91 194.0 50.2 3.19 231.3 46.1 2.06 296.0 43.0 3.05 344.1 40.6 3.11 396.8 38.5 1.92 483 . 2 36 . 8 3.48 545.3 35.1 2.92 646.3 33.6 1.34 754.7 32.7 Survey Page HORIZONTAL COORDINATES feet 41.32 S 56.38 E 40.98 S 56.87 E ,~, 40.49 S 57.40 E 40.12 S 58.19 E 39.49 S 59.25 E 38.16 S 60.51 E 36.09 S 61.99 E 32.95 S 63.97 E 28.19 S 66.70 E 21.33 S 70.42 E 11.85 S 75.55 E 6.55 N 82.40 E 16.79 N 91.15 E 36.34 N 101.70 E 60.11 N 113.75 E 88.20 N 127.91 E 120.67 N 144.65 E 158.31 N 164.33 E 201.19 N 187.42 E 249.11 N 213.05 E 303.93 N 241.96 E 366.75 N 273.93 E 438.11 N 307.91 E 520.60 N 346.38 E 612.71 N 393.28 E A Gyrodata B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: SUB441 SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. 5000.0 48.35 27.79 5100.0 50.13 27.53 5200.0 49.64 26.74 5300.0 49.63 26.36 5400.0 49.53 27.04 5500.0 50.30 29.56 5600.0 49.92 30.34 5700.0 50.34 29.44 5800.0 50.77 27.42 5900.0 50.54 28.76 6000.0 49.56 29.41 6100.0 48.73 29.77 6200.0 48.91 28.45 6300.0 49.78 27.94 6400.0 50.52 28.69 6500.0 50.26 28.21 6600.0 50.24 27.64 6700.0 50.20 27.20 6800.0 49.99 26.84 6900.0 49.89 26.55 7000.0 50.12 26.21 7100.0 49.97 25.82 7200.0 50.33 27.89 7300.0 50.22 27.85 7400.0 49.93 27.38 VERTICAL VERTICAL DEPTH SECTION feet feet 5059.8 835.3 5159.8 953.6 5259.8 1072.2 5359.8 1189.6 5459.8 1306.9 5559.8 1426.0 5659.8 1545.8 5759.8 1664.4 5859.8 1787.5 5959.8 1908.9 6059.8 2028.8 6159.8 2144.0 6259.8 2257.3 6359.8 2374.1 6459.8 2494.7 6559.8 2615.4 6659.8 2735.7 6759.8 2855.7 6859.8 2975.1 6959.8 3094.2 7059.8 3213.2 7159.8 3332.5 7259.8 3452.4 7359.8 3572.9 7459.8 3692.6 Direct DOGLEG SEVERITY deg. / 100 ft. 1.85 .25 .54 .13 1.48 .70 .50 2.41 .74 .71 1.04 .28 1.82 .73 .39 .28 .37 .25 .18 .27 .35 .23 1.35 .30 .33 i ona 1 CLOSURE DIST. AZIMUTH feet deg. 865.6 32.1 980.4 31.5 1094.7 31.0 1208.6 30.6 1322.4 30.2 1437.4 30.1 1552.6 30.1 1667.3 30.1 1822.3 30.0 1938.0 29.9 2052.8 29.8 2165.8 29.8 2278.3 29.8 2392.5 29.7 2508.1 29.6 2623.6 29.6 2738.8 29.5 2892.4 29.4 3007.2 29.3 3121.9 29.2 3236.8 29.1 3351.6 29.0 3466.8 28.9 3582.2 28.9 3697.3 28.9 Survey Page HORIZONTAL COORDINATES feet 709.22 N 814.04 N 919.60 N 1024.76 N 1129.85 N 1234.25 N 1338.09 N 1440.46 N 1548.79 N 1655.97 N 1760.76 N 1860.86 N 1959.55 N 2062.52 N 2168.49 N 2274.66 N 2380.92 N 2487.48 N 2593.87 N 2700.33 N 2806.95 N 2914.30 N 3021.57 N 3127.93 N 3234.05 N 444.13 E 498.94 E 553.14 E 605.53 E 657.78 E 715.04 E 774.81 E 834.98 E 893.30 E 950.44 E 1008.63 E 1065.73 E 1121.37 E 1176.58 E 1234.02 E 1291.55 E 1347.92 E 1403.25 E 1457.49 E 1511.00 E 1563.98 E 1616.35 E 1670.25 E 1726.80 E 1782.26 E A Gyrodat a Direct ional Survey B.P. EXPLORATION NIAKUK FIELD, WELL NO. NK-62 NORTH SLOPE, ALASKA Job Number: SUB441 Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG DEPTH SECTION SEVERITY feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 7500.0 49.76 26.81 7600.0 49.73 26.49 7700.0 49.48 26.30 7800.0 49.39 25.97 7900.0 49.01 25.46 7559.8 3811.2 .23 7659.8 3928.9 .34 7759.8 4046.5 .42 7859.8 4163.3 .23 7959.8 4279.1 .36 3811.9 28.8 3964.3 28.7 4078.4 28.7 4192.2 28.6 4305.5 28.5 3339.63 N 3444.92 N 3550.36 N 3655.35 N 3759.78 N 1836.26 E 1889.14 E .~. 1941.41 E 1992.87 E 2043.21 E 8000.0 48.62 26.32 8100.0 48.26 25.50 8200.0 49.75 25.64 8300.0 49.53 24.95 8400.0 49.01 24.14 8059.8 4393.2 .28 8159.8 4505.8 .47 8259.8 4620.5 .87 8359.8 4738.0 .42 8459.8 4854.2 .71 4418.1 28.5 4530.0 28.4 4643.6 28.3 4757.7 28.2 4871.1 28.2 3862.47 N 3963.86 N 4067.52 N 4173.96 N 4279.84 N 2093.24 E 2142.50 E 2192.03 E 2242.36 E 2290.79 E 8500.0 48.56 25.87 8600.0 47.52 28.35 8700.0 46.35 30.17 8800.0 48.19 29.69 8900.0 48.01 28.59 9000.0 49.01 28.87 9100.0 49.90 28.06 9200.0 48.91 27.51 9300.0 49.51 27.06 9343.4 50.13 26.92 8559.8 4968.4 1.62 8659.8 5079.0 1.86 8759.8 5187.1 1.78 8859.8 5294.1 2.47 8959.8 5404.2 1.50 9059.8 5517.3 1.14 9159.8 5633.0 1.56 9259.8 5749.6 .54 9359.8 5865.0 .64 9403.2 5916.4 1.05 4983.8 28.1 5094.8 28.1 5204.6 28.1 5314.6 28.1 5425.6 28.1 5538.3 28.2 5652.1 28.2 5765.7 28.2 5879.2 28.1 5916.6 28.1 4383.58 N 4482.40 N 4576.31 N 4668.93 N 4765.20 N 4864.29 N 4966.07 N 5069.22 N 5171.87 N 5217.62 N 2339.18 E 2388.99 E 2442.64 E 2496.12 E 2549.69 E 2604.12 E 2659.18 E 2713.53 E 2766.45 E 2789.76 E Final Station Closure: Distance: 5916.61 ft Az: 28.13 deg. 4. QUALITY CONTROL QUALITY CONTROL REPORT JOB NUMBER: A0198GCE441 TOOL NUMBER: 777 MAXIMUM GYRO TEMPERATURE: 81.94 C MAXIMUM AMBIENT TEMPERATURE: NR MAXIMUM INCLINATION: 51.42 AVERAGE AZIMUTH: 28.13 WIRELINE REZERO VALUE: 0 REZERO ERROR / K: N/A CALIBRATION USED FOR FIELD SURVEY: 2240 CALIBRATION USED FOR FINAL SURVEY: 2240 PRE JOB MASS BALANCE OFFSET CHECK: .40 POST JOB MASS BALANCE OFFSET CHECK~: USED 0.0/N/A CONTINUOUS CONDITION OF SHOCK WATCHES .45 UPON ARRIVALAT RIG: O.K. UPON COMPLETION OF SURVEY: O.K. UPON RETURN TO SCHLUMBERGER O.K. BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 11850 48.91 26.5 9314 5076 2799 FINAL SURVEY 11850 49.00 27.2 9306 5117 2738 FUNCTION TEST JOB NUMBER: A0198GCE441 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gym tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 3900 14.51 14.51 14.51 14.51 14.51 M.D. ft 1 2 3 4 5 3900 26.62 26.59 26.46 26.47 26.56 5. EQUIPMENT AND CHRONOLOGICAL REPORT EQUIPMENT REPORT JOB NUMBER: A0198GCE441 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 777 GYRO SECTION DATA SECTION POWER SECTION COMPUTER A0169 POWER SUPPLY C0111 PRINTER C0112 INTERFACE A0433 A0085 A0079 A0143 TOOL No. 775 GYRO SECTION DATA SECTION POWER SECTION COMPUTER A0165 POWER SUPPLY C0089 PRINTER C0086 INTERFACE A0349 A0107 A0029 A0055 WIRELINE COMPANY: SCHLUMBERGER CABLE SIZE: 15/32" RUNNING GEAR SCHLUMBERGER HOUSING IN COMBINATION WITH USIT TOTAL LENGTH OF TOOL: 75' MAXIMUM O.D.: 3.375 INCHES TOTAL WEIGHT OF TOOL: 750 POUNDS CHRONOLOGICAL REPORT JOB NUMBER: A0198GCE441 TUESDAY,01/27/98 18:00 ALERTED WEDNESDAY,01/27/98 08:00 LEAVE Q PAD 09:00 ARRIVE NIAKUK 11:00 MU TOOL STANDBY, RETURN Q PAD RIG DOWN. .14:30 RIG UP SCHLUMBERGER, RUN JUNK BASKET 15:15 PICK LIP USIT GYRO COMBO, WARM UP TOOL 15:45 RIH TO 3000'. START CONTINUOUS INRUN 3900'. 18:00 SURVEY TO 11999'. 19:00 RUN USIT TO 9675. 21:45 SURVEY OUT CONTINUOUS. 22:30 LD TOOL. BD TOOL. THURSDAY,01/29/98 00:00 02:00 08:00 14:00 18:00 RETURN TO ATLAS. TO Q PAD FINISH OR~NTATION SHOTS 1 RUN RETURN TO ATLAS CHECK TOOL, PROCESS RESULTS. PRINT OUT RESULTS, TAKE TO RIG FRIDAY, 01/30/98 09:00 CHECK ON JOBS ON DOYON 14 AND POOL 7 BOTH JOBS DELAYED. RETURN TO ANCHORAGE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 31 st, 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached are the bluelines and sepias for Niakuk well NK-62. Per 20.AAC 25.537(d) BP' Exploration would like these logs held confidential for 24 months. The specific attached logs include: Log Type Company "Dipole Shear Sonic Imager Log Schlumberger 'RFT ' Schlumberger 'Ultrasonic Imager (Cement -- ~,, ~1,:~ (~c) Corrosion Log) Schlumberger 'ADN Schlumberger "CDR Schlumberger Production Log ~,=~,"bt.. ~,.~-DS Gas Lift Survey ~,~ ~'~'-PDS Run Date Depths 1/22/98 10000'- 11976' 1/22/98 11770'-11920' 1/28/98 1/23/98 1/5/98-1/20/98 3/13/98 3/13/98 Please contact me at 564-5126 if you have any questions. 9800'-12035' 10300'- 12200' 120'- 122OO' 11718'- 12038' 3034'- 11680' ,-, Sincerely, · 'David L. Boyer, Sr. Geologisll Greater Point Mclntyre Area MS Enclosures RECEIVED MAR 3 1998 Alaska Oil & Gas Cons. Commission Anchorage Please sign below and return to Marian Sloan, BPX, Mail Stop MB7-2 for reciept of transmittal. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 November 18, 1997 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative: MAR 2 0 1998 Alaska Oil & GaSCons. Commimion Enclosed are the following cuttings samples for Niakuk #62. Per 20.AAC 25.537(d) BP Exploration would like these cuttings held confidential for 24 months Drilled Cuttings Samples Dry Cuttings: NK-62 (1 box) (in 30' intervals) Depth 10580 - 11750' (core point) Please contact me at 564-5126 if you have any questions. Sincerely, Greater Point Mclntyre Area MS Enclosures Please sign below and return to Marian Sloan, BPX, Mail Stop MB7-2 for reciept of transmittal. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 17,1998 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached are chips from each foot of recovered core for wel[_Niakuk 62 and Core photographs for the depths listed below. Per 20.AAC 25.537(d) BP Exploration would like these core samples held confidential for 24 months. The specific attached core depths include: Core INTERVAL DATA TYPE VENDOR Core # 1 11760 - 11843' Core chips/Core Photos Core Lab Core # 2 11843 - 11993' Core chips/Core Photos Core Lab Please contact me at 564-5126 if you have any questions. Greater Point Mclntyre Area MS Enclosures Please sign below and return to Marian Sloan, BPX, Mail Stop MB7-2 for reciept of transmittal. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 9th, 1998 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear AOGCC Representative, Attached are the attached surveys, blueline and sepia for Niakuk wells listed below. Per 20.AAC 25.537(d) BP Exploration would like these logs held confidential for 24 months. The specific attached logs include: Log Type NK-62 Perforate Record/Jewelry Iog/GR/CCL Company Run Date Depths Schlumberger 2/14/98 11400'- 12082' Please contact me at 564-5126 if you have any questions. Sincerely, ~)avid L. Boyer, Sr. Geologier- Greater Point Mclntyre Area RECEIVED MS Enclosures k~,AR 1 O, 199B ~as~ 0ii & Gas Cons. Anchorage Please sign below and return to Marian Sloan, BPX, Mail Stop MB7-2 for reciept of transmittal. TONY KNOWLES, GOVERNOR AI,ASILA OIL AND GAS CONSERVATION CO~ISSION 3001 PORCUPINE DRIVE ANCHORAGE. ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 December 31, 1997 Steve Shultz Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Niakuk NK-62 BP Exploration (Alaska), Inc. Permit No: 97-256 Sur. Loc.: 1393'NSL, 881'WEL, Sec. 36, TI2N, RI5E? UM Btmhole Loc: 1491'NSL, 2752'WEL, Sec. 30, TI2N, RI6E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface easing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sinc,~v~ ~,,~ ! Robert N. Christenson Commissioner BY ORDER OF THE COMMISSION dif/enclosurcs cc: Department of Fish & Game. Habitat Section w/o enci. Department of Environmental Conservation w/o enci. .. , ALAS ~, OIL AND GAS CONSERVATION MMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work l~ Drill [-IRedrill Ilb. Typeofwell ['-I Exploratory I-IStratigraphicTest I~ Development Oil [-i Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [-I Multiple Zone 2. Name of Operator '5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 59.7' Niakuk Oil Pool 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034635 4. Location of well at surface .7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1393' NSL, 881' WEL, SEC. 36, T12N, R15E, UM Niakuk At top of productive interval 8. Well Number Number 2S100302630-277 1206' NSL, 2909' WEL, SEC. 30, T12N, R16E, UM NK-62 At total depth 9. Approximate spud date Amount $200,000.00 1491' NSL, 2752' WEL, SEC. 30, T12N, R16E, UM 01/01/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TvD) ADL 034630, 2528'I NK-16, 10' at 400' MD 2459 12243' MD / 9546' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 3000' Maximum Hole Angle 49.5° Maximum surface 4380 psig, At total depth (TVD) 9550' / 4865 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 94# H-40 Weld 80' Surface Surface 80' 80' 260 sx Arctic Set (Approx.) ....1.2-1/4"9-5/8" 40# L-80 BTC 5609' Surface Surface 5649' 5260' 2170 sx PF 'E', 440 sx 'G', 50 sx PF 'C' 8-1/2" 7" 26# L-80 BTC-M 10635' Surface Surface 12243' 8546' 280 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner depth:trmu~svuerl~a. 'Perforation ,tlCtt0"" ORIGINAL 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Larry Wolfson, 564-5510 PrePared By Name/Number: Kathy Campoamor, 564-5122 21.1 hereby certify that~thl~l ~ rag oi~'g~,~i~\ true. ~~{nd correct to the be~t,of~ IZ~"~l'~m¥ I~0_ _wledge{.~/~~~/ Signed Steve Shultz ~ ~.~.~( ~ [/t~V~ ~ Title Senior Drilling Engineer Date / 7 "-"Commission Use Only Permit Number I APl Number I Approval Date _ See cover letter ?,~.- ~_..,~'~', 50- ~-- ~ - 2~. 2~- ~~I /~l,, ,~... ~"'7 for other requirements Conditions of Approval: Samples Required ~ Yes [] No Mud Log Required I'-lYes I~ No Hydrogen Sulfide Measures I~ Yes [] No Directional Survey Required 1~ Yes I-I No Required Working Pressure for BOPE [] 2M; [] 3M; I~15M; [] 10M; I-I 15M Other: by order of Approved By ORIGINAL SIGNED ElY Commissioner the commission Date~-',,~/"~' Form 10-401 Rev. 12-01-85 i$0n Submit In Triplicate NK-62 Well Plan Summary Surface Location: 1393' FSL 881' FEL Sec 36 T12N R15E Target Location: 1206' FSL 2909' FEL Sec 30 T12N R 16E Bottom Hole Location: 1491' FSL 2752' FEL Sec 30 T12N R16E I Estimated Start Date: [ 1/1/98 Number: I 731210 I I Rig: I Poo~ #7 I I Operating days: I I I TVO: II I I I Type of Well (producer or injector): Well Design (conventional, slimhole, etc.): Producer Ultra-Slimhole Formation Markers: (all depths RKB) Measured True Vertical Formation Mud Formation Tops Depth~ ft Depth, ft Gradient, ppg Weight, ppg Base Permafrost 1810 1810 8.55~ 8.8 SV3 4540 4470 8.55~ 9.1 SV1 5381 5086 8.55~ 9.1 Ugnu 6306 5687 8.652 9.1 West Sak 8465 7091 8.80~' 9.2 Colville 8956 7410 8.80 9.2 Tuffs/Shale Wall 10675 8529 9.20 9.6 HRZ 11461 9038 9.40 10.43 Kuparuk 11814 9268 9.404 10.4 Kingak 11993 9384 9.40 10.4 Casing/Tubing Program: (all depths feet RKR) Hole Size Csg/Tbg Wt/Ft Grade Conn. Length Top Btm OD MD/TVD MD/TVD 30" 20" 94# H-40 WLD 80 GL 80/80 12 1/4" 9 5/8" 40# L-80 BTC 5609 GL 5649/5260 8 1/2" 7" 26# L-80 BTC-M 10635 GL 12243/8546 N/A 4 1/2" 12.6# L-80 IBT-Mod 11660 GL 11700//9193 Assumed seawater gradient. Formation pressure gradient based on RFT data from NK-17. Mud weight required for wellbore stability. Formation pressure based on NK-16 (injector) g~C~ fall-off test. 12/29/97--LW ,;-' NK-62 Drilling Permit Rev 0 Logging/Formation Evaluation Program: Surface .................................................................................................................................. Production "'~~)'~i(i"]5';~'~i~¥~'~ ......................................................................................... CDR/ADN; CDR equipped w/PWD (Pressure While Drilling tool) Wireline: Schlumberger RFT/BHC Cased Hole Logs: Schlumberger USIT/Continuous Gyro Mud Program: Surface Hole (0-5649'): Fresh Water Surface Hole Mud Interval Density Viscosity YP LSR YP Gel-10 sec Fluid (ppg) (seconds) Loss Initial 8.6-9.2 300-200 70-50 30-40 35-55 12-15 SV3 8.9-9.4 120-200 40-25 18-11 20-35 6-8 Interval TD 9.0-9.4 100-150 25-35 10-15 20-35 6-8 Production Hole to Shale Wall (5649'-10675'): Mineral Oil Base Mud Interval Density PV YP LSR YP Electric Fluid (ppg) Viscosity Stability Loss Initial 9.2-9.4 15-20 20-30 8-12 700-1000 <6 HTHP Colville 9.4-9.6 20-30 18-30 8-12 700-1000 <5 HTHP Shale Wall 9.6 20-30 15-18 8-12 700-1000 <5 HTHP Production Hole Shale Wall to TD (10675'-12243"I: Mineral Oil Base Core Fluid Interval Density PV YP LSR YP Electric Fluid (ppg) Viscosity Stability Loss Initial 10.2 20-30 15-20 8-12 2000 <4 HTHP Kupamk 10.4 20-30 15-20 8-12 2000 <4 HTHP Interval 'I'D 10.4 20-30 15-20 8-12 2000 <4 HTHP Mud Disposal Mud and cuttings will be hauled-off Heald Point and disposed at the appropriate facility. 2 12/29/97--LW NK-62 Drilling Permit Rev 0 Cementing Program Hole Category Casing Volume1 Type of Cement Propertiesz Size/Depth Surface First Stage 9 5/8" @ Lead3 Lead Lead 5,649' 470 sx Permafrost "E" Den 12.0 ppg 182 bbls Yield 2.17 ft 3/sx Water 11.6 gps TT 4.0 hrs Tail`[ Tail Tail 440 sx Class "G" w/ Den 15.8 ppg 90 bbls 0.2 % CFR-3, Yield 1.15 ft 3/sx 0.2 % Halad 344 Water 5.0 gps .................................................... TI' 3.5 hrs Second Stage '§i;~';'~'i'i~' ..... ~'~g ........................... ~';~i ............................................ ,~'~'a ............................................. @ 2,000' 1700 sx Permafrost "E" Same as above 657 bbls Tail6 Tail Tail 50 sx Permafrost "C" Den 15.6 ppg 9 bbls Yield 0.94 ft 3/sx Water 3.5 gps TT 3.5 hrs Production 7" @ 280 sx7 Class "G" w/ Den 15.8 ppg 12,243' 57 bbls 0.7 % Halad 344 Yield 1.15 ft 3/sx 0.5 % CFR-3 Water 5.0 gps 0.1% HR-5 TT Mix on fly 0.25 lbs/sx Super 4.5 + hfs CBL Rounded up to the nearest 10 sacks. Thickening time required; actual times should be based on job requirements and lab tests. Open hole volume from top of tail to stage collar + 30% excess. 750' TVD open hole volume + 30% excess + 80' shoe joint. Open hole volume from stage collar to surface + 350% excess + easing capacity to stage collar. No fill criteria--sufficient volume to ensure high strength cement outside of stage collar. 1000' above T. Kuparuk, open hole volume (9 1/2" x 7") + 80' shoe joint; actual hole volume based on caliper. 3 12/29/97mLW NK-62 Drilling Permit Rev 0 Directional: KOP: Max. Hole Angle: Close Approach Wells: Survey Program: 300' 3000' 1.0°/100 ft nudge to 800'; drop to vertical by 1300'. Begin variable build-l.0-2.5°/100 ft-build to 49.5° @ 29° azimuth 49.5° 5,218'-12,243'; Minimum Normal Distance--Survey-to-Survey NK-16 10' @ 400'; well to be shut-in until surface ....................................................... ..c...a..s..!..n...g...!..s....s...e..t.: ........................................................................................... NK-17 19' @ 800'; well to be shut-in until surface casing is set. Surface - 1000' Single shot gyro surveys; deeper if magnetic interference is detected. ................... ....................................................... Surface - TD Gyro--Gyrodata continuous mode--during completion Drilline Hazards/Risks -- Reservoir Pressure This well will penetrate a portion of the reservoir supported by water injection from NK- 16. The last fall-off test indicated a reservoir pressure gradient of 9.8 ppg EMW. The maximum anticipated surface pressure is 4380 psi; based on a bottom hole pressure of 4865 psi at 9550' tvd and dry gas to surface. Close Approaches NK-16 and NK-17 are adjacent (at the surface) water injection wells to NK-62 and will be shut- in until surface casing is set. Well Control: Well control equipment consisting of 5000 psi WP pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Contacts: Office Home Pager SSD Drilling Superintendent Dan Stoltz 564-4922 Senior Drilling Engineer Steve Shultz 564-5405 373-1657 275-9459 Operations Drlg Engr Larry Wolfson 564-5510 345-6624 275-1711 Asset Drilling Engineer Dan Stone 654-4002 348-0239 4 12/29/97--LW NK-62 Drilling Permit Rev 0 Operations Summary . . . 7. 8. 9. 10. 11. MIRU drilling rig. NU and function test diverter. Spud well and drill 12 1/4" hole to 5649' per attached directional program. Run and cement 9 5/8" casing in two stages to ensure cement returns to surface. Test casing to 3000 psi for 30 minutes. Install and test BOP to 5000 psi. Note AOGCC witness or waiver on the morning report. M/U 8 1/2" BHA and drill 20' of new hole and perform LOT. Drill to Top Shale Wall and change over to mineral oil base core fluid. Drill to core point at Top Kupamk. PFU 8 1/2" coring assembly and core as directed. Drill to TD @ 12,243'. Run open hole logs. Run and cement 7" production casing. Run 4 1/2" completion. Set packer and test tubing to 4000 psi; annulus to 3500 psi. Freeze protect well. ND BOP and NU tree assembly. Test tree assembly to 5000 psi. Secure well and release rig. Post Rig Activities 1. Run cased hole logs. 2. Wireline perforate well. Attachments · Directional Plan 5 12/29/97--LW 1111 Basl~ 80th Avenue Anchorage, AE 99518 {907) 349-4511 Pax 3&&-2160 DIRECTIONAb ~Lb PLAN for SHAL~I~D SEI;tV~C~ DRILL~I~ We31 ......... = N£-62 (Tgt A) ~£eld ........ : Nlakuk Computat£o~..= Min£~um Curvature Un£Cs ........ = EEET Surface LAC..= ?0.3474&606 N Surface Long.~ 148.2002~730 W Lega~ Description Surface ...... : L393 FSL 881 TaTc3et ....... ~ ~206 FSL 2909 FEL S30 BIlL .......... = 149L P8~ 2752 FEL S30 LOCATIONS - ALASKA Zone= 4 X~Cuord Y-COord 72~679.85 5979932.14 924356.00 S985107.00 72{503.38 5905397.29 PROPOSED WBLL PRDFTbE STAT£0N £DENTIF~CAT=ON m m ~mm{mm m m { {m 'NUD~ ~UILD ~/~00 Erepared ..... : 27 Dec 1999 Ver~ sect az.= 28.61 KB elevation.: 59.70 EL ~agne1~£c Dcln: *28.596 (E) $ca~e ~auCo~.: 0.99995582 ~ve~enc~..: +1.694~_ ' ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN B~ION ~Z~TB~-F~ ~8~ Zone 4 DEPART ~BL~ X Y -0.0~ 1.69 S 3.05 B 721682.9~ 5999930.54 -O.O6 3.8L 8 6.86 ~ q21686.82 5979928.53 ?oo~ ~B ~00 ~mmm ~mm~ 119K O.O0 1LgR 0.00 ~29R ~.00 ~19R ~.00 119; 1,00 NUD(3E DROP 1/~00 700.00 &.O0 119.04 699.68 639.99 -0.10 6.;8 800.00 5.00 119.0& ~99.39 739.67 -0.16 10.58 900.00 4.00 119.0& 899.06 ~39.36 -0.22 14.39 1000.00 3.00 ~9.0& 998.87 939.17 -0.23 ~7.36 LIO0.O0 2.00 L19.04 1098.77 L03g.o? -0-30 L9.47 12.20 g T2L692,25 5979925.93 LIgR L.O0 19.06 B 921699.22 5979922.13 ~9R 1.00 25.92 B 721706.18 59799~8.52 119R 1.00 31.26 ~ 721711,6I 5979915.72 119R 1.00 35.07 E 72ZTLS.48 5999913.71 1~9R 1.00 1200.00 1.00 119,04 1~98,74 1139,0& -0.32 20.'/4 8 37.36 H 721917.81 59799L2.51 119R l.O0 .: eND lqUDG~ DROP ~/100 1300.00 0.00 119.0& 1298.'73 1239.a3 -0.33 21,17 :8 38.12 B 7217:L$,58 59799:12.11 2:9R 1.00 : : : ! ITl · (Rnadr£~1 (e)97 NK$2~02 3.2b,$ 3:1; 1~4 P) ......... L~-62 (Tgt. A) P02 27 Dec 1.99'7 Page 2 2UrLD 2.5/100 DEDTH 1810.97 0,00 3000.00 0.00 31.00,00 1..00 3200.00 2.00 3300.D0 3.50 3400.00 $.oo 3500.o0 3600.00 9.oo 3700.00 11.60 3800.00 14.00 3900.00 1.6.50 4000.00 Ig. OO 4100.00 21.50 4200.D0 2&,O0 4300.00 26.50 4400.00 29.00 4500,00 31.50 4540,07 32.50 4600.00 34.00 4700.00 36.50 4800.00 39.00 4900,00 41.50 5000.00 44.00 5100.00 46,50 5200.00 49.D0 PROPOSED W~LI~ PROFILE D~P. XCT~ON V~RTICKT~-:DEL:~I'HS AXI~U'%~ .TVD $~-SBA ~g.O~ ~BO~.~O ~0.~0 28.6~ 2998.73 2939.03 28.61 3098.73 3039.~3 28.61 3199.69 3138.99 28.61 3298.~ 3238.87 28.61 3398.29 3339.59 28.61 3497.74 343~.04 28.61 3596.76 3537.06 28.61 3695.16 3635.46 28.61 3792.69 3732.99 BECT~0N DEPAI~T -0.33 -0-35 0.55 3.16 7.96 15.37 2s.e~ 39.74 57.53 ?9.60 C}O0~[NATSS-FROM AL~F~ Zone 4 TOOL D~/ ~'SL~H~AD X Y FACE 100 21.17 S 38.12 X ~21~15.5B 597991.2.~ 29R O.O0 21.17 S 38.12 ~ ]21718.5~ 5979912.11 29~ 0.00 2O.&O S 38.$4 E 7217~8,98 5979912.89 29R 1.00 ~8.10 S 39.79 ~ 721720.16 5979915.22 29R 1.00 13,89 S 42.09 ~ 721722.33 5979919.50 29~ 2.50 ?.39 $ 45.64 E ?21725.69 5979926.11 1.79 N 50.65 g 721730.42 5979935.43 ~4.01 R $?.~1 ~ 721736.72 59?994?.84 29.63 B 65.83 ~ 721744.77 S979953.70 49.00 H 76,40'E 721754,76 5979983.38 RS 28.61 3889.16 3829.46 105.90 72.09 28.61 3984.39 3924.69 136.39 98.85 28.61. 4078.20 401.8.50 1~1.00 129.23 28.6~ 41~0.41 4110.?~ ~09.66 163.18 28.$1 &260,85 4201.15 252.32 200.63 28,61 4349.34 4289.64 298.8~ 241.50 28.61 4435.72 4376.02 349.25 285.72 28.61 4469.~0 44~0.00 370.48 304.36 28.61. 4519.82 4460.12 403.34 333.21 28.61 4601.4& 4541.78 461.05 383.8? 28.61 4680.5~ 4620.94 522.27 26.61 ~756.86 4697.16 586.88 2B.61 4830.28 4770.58 654.75 28.$1. 4900,68 4840.98 725,76 2S.S1 4967.91 ~908.2~ 799.78 88,99 H 721766.67 5980006.83 103.59 ~ 721780.47 5980034.01 29R 1..50 120.16 g 72].'796.13 S980064.87 1.38.68 E 721813.64 5990099.$4 H9 2.54 159.I2 B 721832.95 598013'7.3? }TS 2.5 , 215.69 B 721896.44 5980242.'13 }IS 2.$£ 231.43 B '721901.31 59802'72.03 HH 2.5i 2,~9.06 B 72192'7.44 S980323.49 HS 2.5( 437.61 N 286.38 E 721955.15 5980378.07 2 .S( 2.50 2.50 2.50 2.50 494.33 N 319.32 ~ 721984.39 5980435.68 $53.92 N 351.B2 ~ 722015.12 5980496.19 · 6~6.26 N' :;'385.83 ~ 722047.26 5980559.51 681.23 N ' ~21.27 ~ 722080.7~ 5980626.5~ 2.00. 2.0~ 2.s~. ~o5 0 28.61 49'79.'78 4920.08 813.55 28.61 5085.90 S026.00 93'7.36 2B.61 5259.70 5200.00 1140.76 693.32 ~ ' 429.86 g 722087.00 598063q.78 ~8 2.50 802.02 N "487.16 E 722143.05 5980948.18 H5 0.00 980.58 N 584.56 ~ 722235.~2 S980929.53 H; O.O0 '13 3> rtl _--= m mm,m m ~_ m mm mt m =:=m m m mtmtm m 8TATTON ~DENTIPICATIOLq U~4A(K-15J W~.~T SAK CM3 {K-12) C0~.¥ ILL~ KUPARUK m tm MEA~U~O ~NC~N DHPTH AIe3LH 6305.66 49°45 8445.45 49.45 8956.21 49.45 1L440.43 49.4~ ~814.44 49.45 K~HGAK L~992.89 49.45 TD / 7' CAGING P0~NT ~2242.89 49.45 DIRECTION VHRTICAL-D~THS AZIMUTH TVD SL~-S~A 2fl.6~ S684.70 ~527.00 28.61 7090.70 7~31.D0 25.41 7409.?0 7350.00 28.6~ 9037.70 8978.00 ~$.61 9267.70 9208.00 DE~A~T 1639.91 ~28~.14 3454.04 5825.98 28.61 9267.;0 9208.00 5825.98 28.6~ 9383.70 9~24.00 S941.58 28.61 9546.2~ 9486.$I 6151.55 · 27 Dec 1997 Pa~e 3 ~~THS-F~OK ~g~ zone ~ TOO~ DL/ gS~ ~ y PAC~ 100 L4LB.37 N g23.~9 E 7~2461.08 59913q4.59 HS 0.00 2859.S8 N 1609.52 B 923204.02 5981837.95 3186-94 N 1~88.09 ~ 723372.82 S983~7~.~4 ~ 0.00 4659.63 N ~699.42 E 72423~.29 598&86~.28 5093.66 N 2828.1q B ~2%356.00 598S10V.00 HS 0.00 $093.66 N 2828.~7 E 724356.00 5985107.00 H~ 0.00 5212.~0 ~ 2893.31 B ~2441~.38 5985227.90 HS O.00 53V9.47 N 29B4.0S H ?24503.38 S955397.29 0.00 ANADRrLL AKA-DPC APPROVED ] FOR PERMITTING ONLY J · - ~ Z "U m , 12/27/1997 17:18 g07-3~...4-2150 ANADRILL DPO~,. { PAGE 85 -- iii ! i - ~ i ii · III ii I ~111~1 NK-62 (Tgt A) VERTICAL SECTION Section at: 88.6] TVO Scale.: ! inch = i200 feet Oep Scale.: ] inch = i200 feet Drawn ..... : 27 Oec 1997 PO2 VIEW ~tnadr~ 1] Schlumberger Marker Identification NO BKB Al KB 0 0 B} NUOBE BUILO t/tO0 300 300 C) NUDGE DROP t/lO0 800 799 D) ENO NUDGE DROP i/lO0 1300 i299 E) KOP BUILD t/tO0 3000 2999 F) BUILD i.5/lO0 3200 3199 G) BUZLD 2/~00 3400 3398 H) BUILO 2.5/t00 36007.. 3597. Il ENO 2,5/t00 BUILD §2t8 4980 J) 9-5/8' CASING POINT 5649 5260 K) TARGET ~**NN{~,,~mm ]~814 9268 L) TG / 7' CASING POINT ~2~43 9546 SECTN 0 0 -0 -o -0 3 15 40 814 I INCLNi 0,001 0,00! 5.00! 0.00{ o.ooi 2.00[ 5.oo! g.OO{ 49.45J 49,45j 49.451 49.4~ EO0 i200 t800 2400 3000 3600 Section Departure 4200 4800 5400 6000 6600 7200 { 7BO0 i 12~/27/1997 17:10 907-344_-2160 ip,. ANADRILL DPC PAGE OG NK-62 (Tgt A) PO2 PLAN VIEW CLOSURE ' 61§2 feet at Azimuth 29.02 OECLINAT ION.' +28,596 (E) ISCALE ...... ' ! inch -- 20 feet DRAWN,,, · 27 Dec 19§7 Anadri 11 Schlumberger Marker Identi f ication AI KB 140 0 ON 8) NUD~ BUILD ~/lO0 300 0 N C) NUD6E DROP t/200 800 O) ENO NUOGE OROP l/t00 ~300 22 S E) KOP BUILD 1/100 3000 2t S F) BUILD t.5/iO0 3200 18 S 40 E G) BUILD 2/100 3400 7 S d6 E H) BUILD 2,5/100 3600 14 N 57 E I) END ELS/lO0 BUILD §218 . 693 N 428 E J) 9-5/8' CASING POINT 5649 98t N 585 E K) TARGET N###NNNNIlNtl~I# t~B~4 5094 N 2628 E L] TD / 7' CASING POINT t22,43 5379 N 298,4 E E/N ~ · 38 E 2O tO 0 10 20 30 40 50 60 70 80 90 I00 JJO I 120 <- WEST · EAST -> , _ · i _ i I ii i i ! ~rker Ident ~ f ~c~t ~on E/W ' NK-62 (Tgt A) PO2 I PLAN VIEW I ii I CLOSUfl£. · 6~58 feet at Azimuth 29,021 DECLINATION.' +28,596 (E) ! inch: 1000 feet 27 Dec 1997 SCALE. · DRAWN ...... - MD N/S NUOGE OROP t/100 800 t~S t9 E) KOP BUILD 1/100 3000 2tS 38E F) BUILD ,.5/,00 ,aoo ,88 40E G) auI~ ~/,00 3400 7s 46E H) BU,LD 2.S/,OO 3600 J4N ST E I) ENO ~.5/,00 BUILD 52,8 693, 42BE J] 9~/8' CASING POINT 5649 9B$ N 585 K) TARGET ~N~~ t~8~4 5094 N 2828 L) TO / 7' CAS[NE POINT tZ~43 5379 N 2984 ii i Anadr~_ ]] SchY, u~be,,rge~ I ii · I ! 500 0 500 (000 t500 2000 2500 3000 <- WEST' EAST -> _ . ii _ ii - 3500 4000 4500 5000 ,5500 i ii i i 6000 i DATE INVOICE I CRED~ MEMO DESCRI~ION GRO~ DISCOUNT NET 1118~7 CKl118~7~ 100. O0 100. O0 PYMT COMMENTS- accompang 'permit to drill' ~ application · HANDLING INST' s/h kathg campoamor, x51~2 ~~ A~ACHED CHECK IS IN PAYMEm FOR ~ DE~RIBED A~VE. ~ 1 OO_ OO 2 OO. OO ~E · WELL PERMIT CHECKLIST COMPANY 'FIELD & POOL ~ ~-~J~/~"'"~ INIT CLASS ,/~,~ /"-".~.~' WELL NAME. ,,,~,,'~_ -- ~' 2.- GEOL AREA PROGRAM: exp r'! dev'~redrll [] serv [] wellbore seg r.: ann, disposal para req ~?,~'~'-~ UNIT# //~'~'~'~ ON/OFF SHORE ~ ,,f.,.,) ADMINISTRATION . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. '13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included .............. Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... ENGINEERING ,,' GEOLOGY 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Conductor string provided ................... N Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & sud csg ..... CMT vol adequate to tie-in long string to surf csg ........ CMT will cover all known productive horizons .......... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved.... Adequate wellbore separation proposed ............. '~ .N If diverter required, does it meet regulations .......... N Drilling fluid program schematic & equip list adequate ..... N BOPEs. do they meet regulation .... ' ' '>""0Z,~ ..... · . N BOPE press rating appropriate; test to ~ .psig. .N. >,/-' Choke manifold complies w/APl RP-53 (May 84) ........ N Work will occur without operation shutdown ........... N Is presence of H2S gas probable ................. N A_P~PR D~T F__/ 30. Permit can be issued w/o hydrogen sulfide measures ..... Y 31. Data presented on potential overpressure zones ....... Y 32. Seismic analysis of shallow gas zones ............. /Y/ 33. Seabed condition survey (if off-shore) ............. / Y 34. Contact name/phone for we.eklyprogress reDqrts ....... ~. Y lexp~orazory omyj REMARKS GEOLOGY: ENGINEERING: COMMISSION: BEW :) ,t/ DWJ ,¢ - JDH . (.<~"' RNC~ CO Comments/Instructions: HOW/lit - A