HomeMy WebLinkAbout185-253 Kt I • • NOV 292012 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGGC WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other .® Abandoned ❑ Suspended 1b. Well Class 20AAC 25.105 20AAC 25110 ❑ Exploratory ❑ Stratigraphic ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero • 0 Development ❑ Service 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 11/13/2012 4 . 185 - 253 . 312 - 382 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 11/21/1985 - 50 029 - 21470 - 00 - 00 ' 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 12/6/1985 PBU D -29 ' 1986' FNL, 1067' FEL, Sec. 23, T11 N, R13E, UM • 8. KB (ft above MSL): 70 84 • 15. Field / Pool(s) Top of Productive Horizon: 429' FSL, 732' FWL, Sec. 13, T11 N, R13E, UM GL (ft above MSL): 42.49' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD) Oil Pool • 671' FSL, 944' FWL, Sec. 13, T11 N, R13E, UM 10139' 9179' 4b. Location of Well (State Base Plane Coordinates, NAD : 10. Total Depth (MD +TVD) 16. Property Designation: Surface: x- 654093• y- 5959015 ' Zone- ASP4 , 10170' 9207' . ADL 028285 • TPI: x- 655841 y- 5961467 Zone- ASP4 11. SSSV Depth (MD +TVD) 17. Land Use Permit: Total Depth: x- 656048 y 5961713 Zone- ASP4 None 18. Directional Survey: ❑ Yes 0 N 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: DIL, BHCS, CDL / CN Log - Poro, CDL / CNL - Raw N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu yds Concrete 13 -3/8" 72# L -80 Surface 2680' Surface 2680' 17 -1/2" 3256 cu ft Permafrost, 465 cu ft PF 'C' 9 -5/8" 47# L -80 Surface 9389' Surface 8508' 12 -1/4" 2031 cu ft Class 'G', 697 sx Class 'G' 7" 26# L -80 9100' 10165' 8254' 9203' 8-1/2" 308 cu ft Class 'G' 4 -1/2" 12.6# 13Cr80 8990' 9946' 8158' 9006' Scab Liner 145 sx Class 'G' 24. Open to production or injection? ❑ Yes 0 No 25. TUBING RECORD If Yes, list each interval open MD DEPTH SET PACKER SET (MD +TVD of Top & Bottom; Perforation Size and Number): S ( ) ( MD / TVD) 4 - 1/2 ", 12.6#, 13Cr80 9021' 8885' / 8068' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 2 �� 9 WAS HYDRAULIC FRACTURING USED DURING COMPLETION ?❑ Yes 0 No %AHMED MAR 2 0 J DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 9770' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, Gas Lift, etc Not on Production N/A Date of Test Hours Tested Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes 0 No . Sidewall Core(s) Acquired? ❑ Yes ® No • If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None FiRDMS NOV 302012 r Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only 11'12 Y ?Z'...„.:..1 t' ti G 29. GEOLOGIC MARKERS (List all formations ar rkers encounter 30. FORMATION TESTS NAME TVD Well Tested? Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 9343' 8468' None Shublik 9373' 8494' lvishak / Zone 4 9449' 8562' Formation at Total Depth: 31. List of Attachment: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Troy Jakabosky, 68; Troy Jakabosky @bp.com Email: Joseph.Lastufka @bp.com Title: Drilling Technologist Printed Name: Jo astu a Signatur : f Phone 564 - 4091 Date: 4t [2.1 1 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10 -407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate foram for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 10/2012 Submit Original Only • • D -29, Well History (Pre Rig Sidetrack) { Date Summary 10/26/12 INITIAL T /I /O= 2200/300/500 PSI. RIH WITH WELLTEC MILLING TOOL. 10/27/12 T /I /O 2305/314/489 Temp =SI Assist E -line (Set whipstock) Pumped 3 bbls MEOH & 259 bbls 1 %KCL to load TBG & pumped an additional 40 bbls DSL for FP. Pump 33 bbls diesel to load well prior to whipstock set. 10/27/12 WELLTEC TOOL CCL SIGNAL LOST, POOH AND SWAP OUT TOOL STRING. RIH WITH BACK UP WELLTEC TOOL STRING AND MILL XN NIP AT 8994'. ON DEPTH WITH SLB PERF/ JEWELRY LOG DATED 13- JULY -2009. DRIFT THRU XN NIP AFTER MILLING AND PULLED UP PASS FROM 9058'- 8930' — NO RESTRICTIONS. AFTER MILLING MILL GAUGED AT 3.806 ". LRS L &K WELL WITH 1% KCL. RIH WITH BKR 4 -1/2" KB PKR WHIPSTOCK. SET TOP AT 9770'. CCL TO TOP OF WHIPSTOCK = 17.8'. CCL STOP DEPTH = 9752.2'. ORIENTED 84.5 DEG ROHS 2 RA TAGS 9' FROM TOP OF WHIPSTOCK. 10/28/12 POMIT -T PASSED to 2000 psi. Pumped 10 bbls DSL to test. 1st 15 min TBGP lost 21 psi & 2nd 15 min TBGP lost 2 psi for a total TBGP loss of 23 psi in 30 min. Bled back — 2.5 bbls. FWHP 0/314/497. 10/28/12 POOH. LRS MIT -T 4 -1/2" BKR PKR WHIPSTOCK TO 2000 PSI PASSED. BLEED DOWN WELL PRESSURE TO 0 AND RIG -DOWN. FINAL T /I /O = 0/350/500. 10/29/12 T /I /0= 80/300/500 Conducted PJSM. Barriers = Swab, SSV, and TWC. Start barrier list. Performed LTT on Master, SSV, Wing, and Swab, all PASS. PT'd against Swab & SSV 500 psi./ 5 min. Pass. Removed tree cap, attached lubricator w/TWC, PT'd 250 /Iow..3500 /high..5 min. each..PASS (see chart in TRP folder for Rig) Set TWC. Shut barriers, removed lubricator, c/o tool string, attached lubricator, PT'd against Swab & SSV, 250 /Iow..3500 /high..Pass. Run polish rod to 6" above TWC. With 0 psi. on tree, Torqued all flanges to specs. (see log) Shell tested against TWC 250 /Iow..5000 /high Pass (see chart in TRP folder) Pulled TWC. 11/03/12 T /I /O = SSV/320/460. Temp = SI. Bleed WHPs to 0 psi (pre CTD). Wellhouse and flowline removed. IA & OA FL near surface. Bled OAP to 0 psi in 1 hr 30 min (all gas). Held open bleed for 30 min. While swapping to IA OAP increased 20 psi and 180 psi in 30 min. Ran jumper hose to bleed OAP & IAP together. Bled IAP & OAP to 4 psi in 2 hrs (all gas). Monitored for 30 min. IAP increased 16 psi. OAP increased 176 psi. Job incomplete. Final WHPs = SSV /20/180. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 1600. 11/04/12 T /I /O = SSV/37/340. Temp = SI. Bleed WHPs to 0 psi (pre CTD). Wellhouse & flowline removed. IA & OA FL near surface. Bled IAP to 0+ psi in 2 hrs 30 min. Bled OAP to 0 psi in 30 min, held open bleed for 2 hrs. Monitored for 30 min. IAP increased 4 psi. OAP increased 167 psi. Job incomplete. Final WHPs = SSV/4/167. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 1530. 11/05/12 T /I /O = SSV /5/420. Temp = SI. Bleed WHPs to 0 psi (Pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. Bled IAP & OAP to 0 psi in <5 min. Held open bleed on IA & OA for 3 hrs. Monitored for 30 min. OAP increased 170 psi. Final WHPs = SSV /0/170. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 04:30 hrs. 11/06/12 T /I /O = SSV /3/350. Temp = SI. Bleed WHPs to 0 psi (Pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. IAP increased 3 psi, OAP increased 240 psi in 6 hrs. Bled IAP & OAP to 0 psi in <1 min. Held open bleed on IA & OA for 5.5 hrs. Monitored for 30 min. OAP increased 87 psi. Final WHPs = SSV /0/87. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 1630 hrs. Page 1 of 2 • • 0 -29, Well History (Pre Rig Sidetrack) Date Summary 11/06/12 T /I /O = SSV /3/350. Temp = SI. Bleed WHPs to 0 psi (Pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. Bled IAP & OAP to 0 psi in <5 min. Held open bleed on IA & OA for 8 hrs. Monitored for 30 min. OAP increased 90 psi. Final WHPs = SSV /0/90. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 04:30 hrs. 11/07/12 T /I /O = SSV /2/290. Temp = SI. Bleed WHP's to 0 psi. (Pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. IAP increased 2 psi, OAP increased 200 psi in 5 hrs. Bled IAP and OAP to 0 psi in <1 minute. Held open bleed on IA & OA for 6 hrs. Monitored for 30 minutes. IAP unchanged. OAP increased 50 psi. Final WHP's = SSV /0/50. SV, WV, SSV, MV = C. IA, OA = OTG. NOVP. 04:30 hrs. 11/07/12 T /I /O = SSV /0/260. Temp = SI. Bleed WHP's to 0 psi. (Pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. Bled OAP to 0 psi in <1 minute, and held open bleed. 11/07/12 T /I /O = SSV /2/290. Temp = SI. Bleed WHPs to 0 psi (pre CTD). Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. Bled IAP & OAP to 0 psi in <1 minute. Held open bleed on IA & OA for 4 hours. Monitored for 30 minutes. OAP increased 112 psi. Final WHPs = SSV /0/112. SV, WV, SSV, MV = Open. IA & OA = OTG. NOVP. 16:30 11/08/12 T /I /O = VAC /0/260. Temp = SI. Bleed WHP's to 0 psi. (Pre CTD). ***"Continued from 11 -07 -12 WSR * ** Wellhouse and flowline removed. IA FL near surface. OA cemented to surface. Held open bleed on IA and OA. SI OA @ 1630 for 30 min. OAP increased 50 psi. Continued open bleed. 11/09/12 T /I /O = SSV /0/260. Temp = SI. Bleed WHP's to 0 psi. (Pre CTD). " ** *Continued from 11/08/12 WSR * * * ** Hold open bleed on IA and OA. Shut in bleed at 04:30 for 30 minute monitor, IAP unchanged, and OAP increased 45 psi. Continued to hold open bleed. CO w/ night shift @ 1900. SI bleed for Valve crew to install valves and blind flange for 3 hours, IAP remained @ 0 psi & OAP increased from 0 psi to 150 psi. Bled OAP to 0 psi in 30 seconds, holding open bleed. 11/10/12 T /I /O = SSV /0/150. Temp = SI. Bleed WHP's to 0 psi. (Pre CTD). Hold open bleed on IA and OA. SI bleed for Valve crew to install valves and blind flange for 3 hours, IAP remained @ 0 psi & OAP increased from 0 psi to 150 psi. Bled OAP to 0 psi in 30 seconds, maintaining open bleed. Change out w/ day shift. SI OA bleed @ 1800 hrs for 30 mins. OAP increased from 0 psi to 35 psi. Bled OAP from 35 psi to 0 psi in <1 min. Job discontinued per WIE. SI IA & OA bleeds & monitored for 15 mins. IAP unchanged & OAP increased 15 psi. Job complete. Final WHPs= SSV /0/0. SV. WV & SSV =C. MV =O. IA & OA =OTG. NOVP. 1700 hrs. 11/10/12 T /I/0= 0/0/0 Conduct PJSM; Barriers= Correct# of turns on OA valve, verified 0 psi & monitored for 5 min., LTT passed; Installed Second (piggy back) 3 -1/8" CIW OA valve; Torqued flange nuts /studs to API spec. P.T. (charted) to 300 psi /3500 psi (pass); Barriers= MV & SSV, Verified barriers by applying 500 psi through tree cap independently, LTT passed; Installed un- tapped blind flange on Flow cross companion, torqued to spec.; P.T. (charted) to 300 psi /5000 psi (pass); Charted tests downloaded into U -drive TRP folder. Page 2 of 2 • • Common Well Name: D -29 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/11/2012 End Date: 11/18/2012 X3- 012V9 -C: (1,978,076.00 ) Project: Prudhoe Bay Site: PB D Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 11/21/1985 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: / Lat: 070 °1741.783 "3 Long: 0148 °45'08.112 "W Active Datum: ORIG KELLY BUSHING @70.84ft (above Mean Sea Level)__ Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/11/2012 11:00 - 14:00 3.00 MOB P PRE FINISH RIG MOVE CHECKLIST TASKS. HOLD PJSM ON MOVING RIG OFF OF WELL. ASSIGN SPOTTER POSITIONS, DISCUSS IMPORTANCE OF CLEAR, CONCISE COMMUNICATION AND GENERAL RIG MOVE HAZARDS. MOVE RIG OFF OF 06 -16A - CLOSE OUT WWT FOR 06 -16A WITH PAD OPERATOR. 14:00 - 20:00 6.00 MOB N RREP PRE MOVE RIG FROM DS 06 -16A. TURN ONTO SPINE ROAD FROM DS 06 ACCESS ROAD AND TRAVELED 1/8 MILE BEFORE RIG BROKE DOWN. STOP RIG MOVE OPERATIONS AND BEGIN TROUBLESHOOTING THE PROBLEM. DETERMINED THAT A SERVO CONTROL FOR THE HYDRAULIC SYSTEM WAS BAD. PARTS ORDERED AND REPAIRS MADE TO THE DRIVE SYSTEM. 20:00 - 00:00 4.00 MOB P PRE CONTINUE WITH RIG MOVE TO D-29A. -24 HR NOTICE FOR BOP TEST ON D-29A GIVEN TO AOGCC AT 21:00 HRS ON NOV 11. 11/12/2012 00:00 - 01:30 1.50 MOB P PRE CONTINUE MOVE F/ DS 06 -16A TO D-29A. SPOT RIG IN FRONT OF D-29 WELL. 01:30 - 02:00 0.50 MOB P PRE HOLD PJSM WITH RIG CREW TO MOVE OVER WELL. MOVE OVER WELL. CONDUCT INSPECTION ON TREE TO ENSURE VALVES CLOSED. OA- 250 PSI IA- 0 PSI TUBING - 0 PSI ON GAUGES. MOVE OVER D-29A. 02:00 - 06:00 4.00 MOB P PRE ACCEPT RIG AT 02:00HRS. CONTINUE RU OPERATIONS: SPOT TRAILERS, WELDING SHOP, FUEL STATION, SPOT CUTTINGS BOX, RUN HARDLINES FOR TIGER TANK, TEST BARRIERS FOR BREAKING CONTAINMENT, ND TREE CAP. 06:00 - 08:00 2.00 MOB P PRE CHANGE OUT KOOMEY- HOSES. HARDLINE CREW RIG UP AND PRESSURE -TEST SURFACE LINE TO TIGER TANK. RECEIVE WRITTEN CONFIRMATION FROM JEFF JONES THAT HE WILL WAIVE WITNESSING THE BOP -TEST. 08:00 - 09:30 1.50 MOB P PRE INSTALL NEW KOOMEY- HOSES. FUNTION -TEST BOP'S TO TEST HOSES, FIND NO LEAKS. 09:30 - 11:30 2.00 BOPSUR P PRE FLUID PACK KILL, CHOKE STACK AND MGS. RIG UP HOSES TO CHOKE AND PERFORM FULL BODY SHELL TEST TO 250PSI LOW AND 4,500PSI HIGH. ACHIEVE GOOD TEST. Printed 11/29/2012 11:39:31AM Common Well Name: D -29 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/11/2012 End Date: 11/18/2012 X3- 012V9 -C: (1,978,076.00 ) Project: Prudhoe Bay Site: PB D Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 11/21/1985 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: / Lat: 070 °17'41.783 "3 Long: 0148 °45'08.112W Active Datum: ORIG KELLY BUSHING @70.84ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 12:00 0.50 BOPSUR P PRE CONDUCT DRAWDOWN TEST. PERFORMED ACCUMULATOR DRAWDOWN TEST. - STARTING ACCUMULATOR PRESSURE = 3,000 PSI - FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR = 2,000 PSI - 24 SEC TO BUILD 200 PSI, 115 SEC TO FULL PRESSURE. - 3 NITROGEN BACKUP BOTTLES WITH 2,000 PSI. 12:00 - 21:30 9.50 BOPSUR P PRE CONDUCT BI- WEEKLY BOPE PRESSURE AND FUNCTION -TEST AS PER NORDIC PROCEDURE, AOGCC REGS & DWOP POLICY. INSTALL 2 -3/8 X 3 -1/2" TEST JOINT AND PERFORM PRESSURE -TEST TO 250PSI / 5MINS AND 3,500PSI I 5MIN ON FOLLOWING ITEMS: - ANNULAR BAG - #1 RAM - BLIND SHEARS - #2 RAM - 2 -3/8" COMBIS (2 -3/8" TEST JOINT) - #3 RAM - 2 -3/8" x 3 -1/2" VBR (2 -3/8" TEST JOINT) - #4 RAM - 2 -3/8" COMBIS (2 -3/8" TEST JOINT) -TIW VALVES ALL RAMS CLOSED WITHIN LESS THAN 2SECONDS. ALSO TESTED HCR AND ALL VALVES ON KILL AND CHOKE LINE AS WELL AS KILL AND CHOKE MANIFOLDS. SUCCESSFULLY TESTED ALL VISUAL AND AUDIBLE GAS ALARMS. SEE ATTACHED CHARTS. WITNESS OF THE BOP TEST WAS WAIVED BY JEFF JONES (AOGCC), BUT WITNESSED BY BP WSL & NORDIC TOOLPUSHER. 21:30 - 22:00 0.50 BOPSUR P PRE CONDUCT EVACUATION DRILL & AAR. HELD PRE -SPUD MEETING WITH RIG CREW. 22:00 - 22:30 0.50 BOPSUR P PRE HELD PJSM TO PICK UP INJECTOR , FILL COIL WITH WATER, TESTING OF INNER REEL VALVE. 22:30 - 00:00 1.50 BOPSUR P PRE FILL COIL WITH WATER. CONTINUE BI- WEEKLY BOPE PRESSURE AND FUNCTION -TEST AS PER NORDIC PROCEDURE, AOGCC REGS & DWOP POLICY. PERFORM PRESSURE -TEST TO 250PSI / 5MINS AND 3,500PSI / 5MIN ON FOLLOWING ITEMS: - INNER REEL VALVE 11/13/2012 00:00 - 00:30 0.50 BOPSUR P PRE COMPLETE BOPE TESTING 00:30 - 01:00 0.50 BOPSUR P PRE BLOW DOWN COIL REEL 01:00 - 03:00 2.00 BOPSUR P PRE HELD PJSM FOR COIL MANAGEMENT. CUT 286' OF COIL FROM REEL. INSTALL COIL CONNECTOR. PULL TEST COIL CONNECTOR TO 40K. HEAD UP WITH BHI E -LINE CONNECTION. 03:00 - 04:15 1.25 BOPSUR P PRE PRESSURE TEST COIL CONNECT. TEST BHI CHECKS. Printed 11/29/2012 11:39:31AM Common Well Name: D -29 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/11/2012 End Date: 11/18/2012 X3- 012V9 -C: (1,978,076.00 ) Project: Prudhoe Bay Site: PB D Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 11/21/1985 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: / Lat: 070 °17'41.783 "3 Long: 0148 °45'08.112 "W Active Datum: ORIG KELLY BUSHING @70.84ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:15 - 06:00 1.75 BOPSUR P -_ PRE PUMP SLACK FORWARD. PRESSURE TEST INJECTOR RISER 06:00 - 09:00 3.00 BOPSUR P PRE PREP TO OPEN UP TO WELL 09:00 - 09:15 0.25 DRILL P ■- WEXIT OPEN MASTER AND SWAB TO CHECK FOR PRESSURE NO PRESSURE WELL ON A SLIGHT VAC 09:15 - 09:25 0.17 DRILL P WEXIT LINE UP TO PUMP METH ACROSS TOP TO ■ ENSURE HOLE IS FULL WELL TOOK —2 BBLS 09:25 - 09:45 0.33 DRILL P WEXIT FLOW CHECK WELL WELL GIVING BACK A LITTLE FLUID MIGHT BE AN AIR BUBBLE CLOSE CHOKE AND NO, PRESSURE BUILD UP OPEN CHOKE AND ITS DOWN TO A TRICKLE, MONITOR FOR A FEW MINUTES 09:45 - 10:10 0.42 DRILL P ® WEXIT NO FLOW FROM WELL, START 30 MIN NO FLOW CHECK 10:10 - 11:45 1.58 DRILL N SFAL WEXIT GETTING A TRICKLE AT THE SHAKER, OPEN THE WHITEY VALVE ON THE NIGHT CAP, GETTING A TRICKLE THERE. CLOSE THE CHOKE SEE IF ANY PRESSURE BUILDS UP. NO PRESSURE, OPEN WHITEY VALVE ON NIGHT CAP AND GOT A LITTLE FLOW THEN STOPPED. OPEN CHOKE AND MONITOR AT SHAKER AND STATED GETTING A SMALL STREAM AGAIN. CLOSE CHOKE AND STREAM STOPPED, VALVE #14 ON CHOKE MANIFOLD IS LEAKING WATER FROM THE MGS. GREASE AND RETEST VALVE MONITOR WELLBORE AT WHITEY VALVE ON LUBRICATOR WHILE SERVICING VALVE 11:45 - 12:00 0.25 DRILL P WEXIT VALVE SERVICED AND RETESTED, OPEN VALVE #17 & CHOKE AND NO FLOW FROM MGS HOLD PJSM TO REMOVE NIGHT CAP AND MU MILLING BHA 12:00 12:30 0.50 STWHIP P ■- WEXIT REMOVE NIGHT CAP, FLUID IS STATIC IN THE STACK MU MILLING BHA 12:30 - 12:40 0.17 STWHIP P WEXIT PU NJECTOR AND MU TO THE BHA 12:40 - 14:00 1.33 STWHIP P WEXIT MU INJECTOR TO THE LUBRICATOR, PT THE ■- QTS AND RIH IAP IAP = 0 PSI OAP = 220 PSI 14:00 - 14:30 0.50 STWHIP P WEXIT STOP RIH, LOOKS LIKE WE MIGHT HAVE GAS MIGRATING BECAUSE THE OUT RATE INCREASING OUT RATE IS CONTINUING TO CLIMB, CHOKE IS AT 3/4 CLOSED WHP= 22 PSI AND SLOWLY CLIMBING WITH 0 PSI DOWN STREAM OF THE CHOKE WHP INCREASING 110 PSI DOWNSTREAM PSI = 84 PSI 14:30 - 15:20 0.83 STWHIP P WEXIT RETURNS ARE MOSTLY FLUID, CONTINUE RIH TO CIRC BOTTOMS UP CHOKE AT 3/4 CLOSED WHP = 29 PSI DOWNSTREAM CHOKE = 0 PSI Printed 11/29/2012 11:39:31AM Common Well Name: D -29 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/11/2012 End Date: 11/18/2012 X3-012V9-C: (1,978,076.00 ) Project: Prudhoe Bay Site: PB D Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 11/21/1985 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: / Lat: 070°17'41.783"3 Long: 0148 °45'08.112M Active Datum: ORIG KELLY BUSHING @70.84ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:20 - 15:45 0.42 STWHIP P WEXIT TAG WS RETURNS HAVE BEEN GAS CUT ALL THE WAY TO THE WS PU AND SHUT IN THE CHOKE TO STRAP THE TT 15:45 - 16:10 0.42 STWHIP P WEXIT 150 BBLS IN TT COME ON LINE AT 3 BPM TO CIRC HOLE CLEAN SAP = 33 PSI OAP = 222 PSI DOWNSTREAM PRESSURE STEADY AT 130 P$I BUT WHP IS CLIMBING REDUCE PUMP RATE 16:10 - 16:30 0.33 STWHIP P WEXIT BOTTOMS UP STILL HAS A LOT OF GAS 16:30 - 17:30 1.00 STWHIP P WEXIT 1.5 VOLUMES PUMPED AND RETURNS LOOK 4 GOOD. PUMP REMAINING KCL OFF THE VAC TRUCK THEN SWAP TO MUD 17:30 - 17:35 0.08 STWHIP P WEXIT DENSITY INCREASING AT CALCULATED VOLUME FOR SURFACE TO SURFACE, BRING RETURNS INSIDE TO CHECK FOR MUD 17:35 - 19:00 1.42 STWHIP P WEXIT LOG TIE IN, -PLUS 8' CORRECTION. • ST� 19:00 20:00 1.00 STWHIP P WEXIT MILL FROM 9766.5' TO 9767.7'. PUMP AT 2.55 -BPM WITH 2360 -PSI. MW IN/OUT 8.6 -PPG, D� 2- A TEMP OUT 75 °. DOWN WEIGHT 17K, WOB 2.6K. VOLUME 322 -BBLS. IA =40 -PSI, OA = V 236 -PSI. 20:00 - 22:00 2.00 STWHIP P WEXIT MILL TO 9768.7'. PUMP AT 2.58 -BPM WITH 2395 -PSI. MW IN/OUT 8.6 -PPG, TEMP OUT (" 79.5 °. DOWN WEIGHT 16K, WOB 3.27K. rc VOLUME 322 -BBLS. IA =43 -PSI, OA = 240 -PSI. 22:00 - 00:00 2.00 STWHIP P WEXIT MILL TO 9769.4'. PUMP AT 2.62 -BPM WITH 2395 -PSI. MW IN/OUT 8.6 -PPG, TEMP OUT 84.4 °. DOWN WEIGHT 15K, WOB 2.1K. VOLUME 322 -BBLS. IA = 46 -PSI, OA = 245 -PSI. 11/14/2012 00:00 - 03:00 3.00 STWHIP P WEXIT MILL TO 9772'. PUMP AT 2.6 -BPM WITH 2432 -PSI. MW IN/OUT 8.6 -PPG, TEMP OUT 89 °. DOWN WEIGHT 11K, WOB 4.3K. VOLUME 322 -BBLS. IA = 50 -PSI, OA = 250 -PSI. 03:00 - 06:00 3.00 STWHIP P WEXIT MILL TO 9,774'. PUMP AT 2.6 -BPM WITH 2480 -PSI. MW IN/OUT 8.6 -PPG, TEMP OUT 90 °. DOWN WEIGHT 14K, WOB 5K. VOLUME 324 -BBLS. IA = 50 -PSI, OA = 250 -PSI. 06:00 - 08:45 2.75 STWHIP P WEXIT CONTINUE MILLING WINDOW FREE SPIN = 2220 PSI CIRC PSI = 2380 WOB = 4.00K WINDOW MILL JUST STARTING TO CUT THE 7" CASING 08:45 - 11:30 2.75 STWHIP P WEXIT 7.5' INTO THE WINDOW WOB = 3.06K CIRC PSI = 2329 PSI Printed 11/29/2012 11:39:31AM Common Well Name: D -29 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/11/2012 End Date: 11/18/2012 X3- 012V9 -C: (1,978,076.00 ) Project: Prudhoe Bay Site: PB D Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 11/21/1985 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: / Lat: 070 °17'41.783 "3 Long: 0148°45'08.112'W Active Datum: ORIG KELLY BUSHING @70.84ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 14:30 3.00 STWHIP P WEXIT 8.0' INTO THE WINDOW WOB = 3.06K CIRC PSI = 2329 PSI PERFORM KWD DRILL DRILLER SIMULATED TAKING A 2 BBLS PIT GAIN WHILE MILLNG THE WINDOW. CTS SUPERVISOR SIMULATED PICKING UP OFF BOTTOM AND SHUTTING DOWN HIS PUMP. THE WELL WAS SIMULATED TO BE FLOWING ANF THE WELL WAS SHUT IN. WHILE THE WELL WAS BEING MONITORED FOR PRESSURE THE FLOOR HAND TOOK A MANUAL STRAP AND DID NOT SHOW THE 2 BBL GAIN. THE DRILLWAS ENDED AS AN ERROR ON THE PVT SYSTEM 14:30 - 16:00 1.50 STWHIP P WEXIT 85' INTO THE WINDOW WOB = 4.00K CIRC PSI = 2401 PSI 16:00 - 17:30 1.50 STWHIP P WEXIT 8.9' INTO THE WINDOW MILL HAS EXITED THE 4.5" CASING AND WORKING ON THE 7" WOB = 4.19K CIRC PSI = 2362 PSI 17:30 - 22:00 4.50 STWHIP P WEXIT MILL EXITED THE 7" CASING AT 9777.3'. BEGIN MILL OPEN HOLE. INCREASE IN WOB OF 0.5K AS STRING MILL EXITED 7" CASING. PUMPING AT 2.5 BPM WITH 2335 PSI. MUD WEIGHT IN AND OUT 8.6 PPG AT 94 °. DOWN WEIGHT 16K WITH 2K WOB. MILLING ROP INCREASING IN OPEN HOLE. 22:00 - 23:00 1.00 STWHIP P WEXIT MILLING AHEAD IN OPEN HOLE AT 9780.4'. ROP INCREASED TO 3 -4 FPH. PUMPING AT 2.65 BPH WITH 2600 PSI. 23:00 - 00:00 1.00 STWHIP. P WEXIT MILL RAT HOLE TO 9,785' MD, 8,791' TVD. PUMP AT 2.6 BPM WITH 2475 PSI. UP WEIGHT 36K, DOWN WEIGHT 13K. VOLUME 325 BBLS. MUD WEIGHT IN AND OUT 8.6 PPG AT 94 °. IA - 60 PSI, OA - 270 PSI. 11/15/2012 00:00 - 01:00 1.00 STWHIP P WEXIT MILL RAT HOLE TO 8,788' MD. PUMP AT 2.6 BPM WITH 2475 PSI. UP WEIGHT 36K, DOWN 13K. 01:00 - 04:30 3.50 STWHIP P WEXIT BACK REAM AND WORK THROUGH WINDOW 3 TIMES. PUMP AT 2.55 BPM WITH 2128 PSI. UP WEIGHT 37K, DOWN 14K. NO ISSUES. INCREASES IN PRESSURE INDICATING MOTOR WORK WHEN WORKING UP THROUGH WINDOW ON FIRST RUN, CLEAN UP ON SUBSEQUENT RUNS. DRY DRIFT WINDOW WITH NO ISSUES. GOOD FORMATION SAMPLES BACK, SAND AND 30-40% CHERT. WORK UP THROUGH WINDOW ON LAST RUN PUMPING AT 1.5 BPM WITH 1350 PSI. UP WEIGHT 34K AT 20 FPM, DOWN WEIGHT 20K AT 24 FPM. 04:30 - 05:00 0.50 STWHIP P WEXIT SHUT DOWN. CLEAN MAGNETS AND SHAKERS. FLUSH POSSUM BELLY AND TROUGH. CHECK COUNTER BALANCE PRESSURE VALVE. FLOW CHECK WELL - STATIC. OPEN EDC. 05:00 - 06:30 1.50 STWHIP P WEXIT POOH. MUD WEIGHT IN AND OUT 8.6 PPG. VOLUME 303 BBLS. PULL AT 70 FPM PUMPING AT 3.5 BPM WITH 2373 PSI. UP WEIGHT 34K. Printed 11/29/2012 11:39:31AM s TREE = ' CM/ WELLI = MCEVOY • D —2 sAil NOTES: ***CHROM E TBG & LNR*** ACTUATOR" BAKER C ... _ _ MAL KB. ELE 70.8' I i I • .. —19-5/8" HES ES CEIVIEMBR BF. ELEV = 44_3 2099' 9' 1• • • I• KOP= 3700' I•I •• OAS, " HES X NP D Max Angle = 37° @ 6100 20" X 30" 110' 141 2112" FR4-1/2 , = 3.813" ,•. ' I * . 4 D ■ atum M3 9796. CONDUCTOR 127. 2115' —19-5/8" BKR PAYZONE ECP, 0 = 8.890' Datum TVD = 8800' SS Oet I• #4 %..■ ',.*: 9-5/8" CSG, 40#, L-80 HY D 563,0) = 8.835" ---1 2680' • GAS LET MANDRELS 9-5/8' BOVVEN CSG PATCH, 0 = 8.835" H 2156. I ST MD I TVD I DEV TYPEI VLV LATCH PORT DATE I 2 3519 3519 4 MMG DMY RK 0 08/25109 13-3/8" CSG, 72#, L-80, ID= 12.347' H 2680' 1 6307 5994 37 MMG DMY RK 0 08/25/09 1 8864' H 4-1/2" I-ES X NIP, 1= 3.813" Minimum ID = 3.80" © 8972' MILLED 4-1/2" HES XN NIPPLE ■,-', 8885' H9-5/8" X 4-1/2' BKR S-3 FKR., 0= 3.850" 1 8909* H4-1/2" I-ES X NIP, 0 = 3.813" 1 8972* 1— 4-1/2" HES XN NP, D = 3.725' I TOP OF 4-1/2' SCAB LNR H 8990' MILLED TO 3.80" (10/28/12) 8990' —19-5/8" X 7" BKRZXP C2 LTP, 0 = 6.310" 4-1/2" TBG, 12.6#, 13CR-80 VAlvt TOP, — 9021" C.4 Er. 9008' — 19 - 5/8" X 7' BKR FLEX LOCK HGR, ID = 6.350* 1 .0152 bpf,10= 3.958" ib. ii: 4 lip r V 9016' —I r X 4-112" x0, 0 = 1950" TOP OF 7 LNR H 9100' io es 1 ' tl Li di! IA 9021' —14-1/2" MULE SHOE, D = 3.958" I 1 N. b et, 9530' — 7' MA RKER JOINT ht .4 9-5/8" CSG, 47#, L-80, D = 8.681" I 9390' 4 fir: . rj . 4 Iii I 4 1/2" BKR KB PKRVVS (10/28/12) ]9770' N ri 4-1/2" SCAB UV, 12.6#, 13CR-80 ET, 9946' .0152 bpf,ID = 3.958" A k i4 PERFORATION SUMMARY REF LOG: GEARHART-BHCS ON 12/06185 '40 , !Ik 4 4 ANGLE AT TOP PERF: 26' @ 9963 ■ Note: Refer to Production 013 for historical perf data SIZE SPF ffsITERVAL Opn/Sqz DATE 3-1/8' 4 9903 - 9915 S 10/09/89 3-1/8" 4 9926- 9936 S 10/09/89 1 3-3/8" 4 9960 - 10111 C 10/09/89 I 1 3-3/8" 4 9963 - 9978 C 10/14/89 I 3-3/8' 6 9964 - 9978 C 07/15/09 3-3/8' 6 9980 - 10000 C 01/28/96 I 3-3/8" 6 9982 - 10005 C 07/15/96 3-3/8" 6 9985 - 10005 C 07/15/09 I 3-3/8" 6 9985- 10005 C 07/15/09 PBTD H 10139' ',YAWN 1•••••••• •••••••• 7" LNR, 29#, L-80, .0371 bpf, ID= 6.184' H 10165' DATE REV BY COIVMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/10/85 NUE I 11111AL COM PLETION 11/11/12 PJC DRLG F'REP ODRRECTIONS WELL: D-29 11)01/08 ' N4ES RWO FERMI Isb:1852530 05/14/09 143/JIVO DREG DRAFT CORRECTIONS API No: 50-029-21470-00 07/26/09 KSB/PJC RE-PMF (07/15/09) SEC 23, TI IN, R13E, 1986' Ft& & 1068' Fa 09/08/09 RPCITLH GLV C/O (08/25/09) 10/30/12 S ET/J ND 10111 ED XN NIP & SET WS (10/28/12) BP Exploration (Alaska) I • • w \� ��� ��� • 9 THE STATE Alaska Oil and Gas °fALASKA Conservation Commission wR GOVERNOR SEAN PARNELL 333 West Seventh Avenue O Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 ..F +• Faxes 76.7542 4° 7 John McMullen Engineering Team Leader g BP Exploration (Alaska), Inc. P.O. Box 196612 N Anchorage, AK 99519 -6612 SCA ���Q 3A Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU D -29 Sundry Number: 312 -382 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P! l Foerster Chair DATED this / Z day of October, 2012. Encl. ' STATE OF ALASKA �� 0' I4v , I V EfD ALA OIL AND GAS CONSERVATION CO •SION TS X1. J2 APPLICATION FOR SUNDRY APPROVAL OCT Q 20 AAC 25.280 OGCC 1. Type of Request: ❑ Abandon ® Plug for Redrill • ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. • ►ii Development ❑ Exploratory 185 453 • 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 029 - 21470 - 00 - 00 • 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU D -29 • Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field I Pool(s): ADL 028285 • Prudhoe Bay Field / Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10170' / 9207' • 10139' 9179' None None Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' _ 110' Surface 2680' 13 -3/8" 2680' 2680' 4930 2670 Intermediate 9389' 9 -5/8" 9389' 8508' 5750 3090 Production Liner 1065' 7" 9100' - 10165' 8254' - 9203' 7240 5410 Scab Liner 956' 4 -1/2" 8990' - 9946' 8158' - 9006' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9963' - 10005' 9021' - 9059' 4 - 12 ", 12.6# 13Cr80 9021' Packers and SSSV Type: 9 -5/8" x 4 -1/2" Baker 'S -3' packer Packers and SSSV 8885' / 8068' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: • e Description Summary of Proposal ® BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ® Development ❑ Service ❑ Str 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 14, 2012 • ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG ® Suspended . 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Troy Jakabosky, 564 -4868 Printed Name Jo McMullen Title Engineering Team Leader t ket- Coss" Prepared By Name /Number: Signature 107/ sokv ✓� Phone 564 Date I 0/ /'''1j Joe Lastufka, 564 -4091 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 32,R-2,.. ❑ Plug Integrity 'BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance # 35oD ps, 130 / e,..54- 1 1 Other: Ir' zo m G z. -- i Z 6- J --f- A tierru-t- r ItA). fv k.e.e.4.,.....÷ c,,O Subsequent Form Required: / 0 _' /c 'Z O R I G I N A L ( 1 / sic -z'7 - '� COMMISSIONER Lt '' ` APPROVED BY Approved By: 4 THE COMMISSION Date � ! Z - � Z F orm 10-403 Revised 0//208,., / Submit In Duplicate y ` t/ noDMS OCT 15 20 - /o. 1'I , 10 • • • To: Alaska Oil & Gas Conservation Commission From: Troy Jakabosky b P Y Y CTD Engineer Date: October 4, 2012 Re: D -29 Sundry Approval Sundry approval is requested for well D -29. D -29 is an original producer completed in Aug 1986 in the 22P/24P sands with 22' of perfs. Production rapidly declined, but responded to back flowing resumably • due to fines migration. In Jan 1988 —40' of 22P/21P were shot resulting in a short lived production benefits. The gas rate steadily increased and in Oct 1998 the original 22P/24P perfs were squeezed. Gas rates increased and STP logs run in Aug 1992 and July 1994 revealed leaking squeezed perfs. A sandback to 9969' and squeeze was done in Jan 1996 but the portion of the 21P/22P open didn't flow, even after reperfing. D -29 was underreamed in July 1996, and 9982'- 10005' was re- perfed. Production stabilized. The well produced with decent on time and increasing gas rates for several years. A 2005 Borax log identified the squeeze perfs were leaking from 9926 -36'. It was shut -in in 2005 until a RWO was done in Oct 2008 to fix the SC leak and run a production scab liner. D -29 is currently cycling with . degrading production and ontime. REASON FOR SIDETRACK D -29 is no longer a competitive producer, and there are no remaining wellwork options. The proposed . sidetrack will access reserves in a —40 acre Zn 2A target (HOT play) in northern D -pad. The proposed plan for D -29A is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around November 15, 2012. The existing perforations will be isolated by setting a retrievable packer whipstock, as well as the primary cement job. The sidetrack, D -29A, will exit the existing 4.5" liner and kick off in Zone 2 and land in Zone 2. The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. m oo['cJ r 0 - 71) `04°- /��a / e `� r h X CphG� , `Zq q 4 O � tT � �® tv ll 0� T . f('d llge , y m ' -" ft0:, (eft"— � ' 9/ �u�' c� e f 1lt4 74,‘f /orr,'0A l 4 t ,°64‘ _ /92/ Pre - Rig Work: (scheduled to begin Oct 14 2012) 1. 0 MIT IA (passed 3000 PSI) 6\22 \12 2. W AC — LDS, AC PPPOT - T(passed 5000 psi) 6\24 \12 3. V PT MV, SV, WV. 4. S Whipstock drift to 9870. 5. E Mill XN to 3.80 at 8972' 6. F Load and Kill. 7. E Set retrievable 4 -1/2 KB Packer Whipstock at 9770, 84° ROHS./ 8. F Test packer to 2400 psi. 9. 0 Bleed wellhead, production, flow, and GL lines down to zero and blind flange. 10. 0 Remove wellhouse, level pad. • P . Rig Work: (scheduled to begin November 15 2012) 1. - MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" dual string window at 9,770' and 10' of rathole. Swap the well to PowerVis. 3. Drill Build: 4.25" OH, 507' (28 deg /100 planned) with resistivity. 4. Drill Lateral: 4.25" OH, 831' (12 deg /100 planned) with resistivity. 5. Run 3 -1/4" x 2 -7/8" L -80 liner leaving TOL at 9,650' MD. w) 6. Pump primary cement leaving TOC at 9,650' MD, 16.6 bbls of 15.8 ppg liner cement planned. p1 r 7. Perform liner cleanout with mill, motor and MCNL /GR /CCL log. 8. Test liner lap to 2,400 psi. 9. Perforate liner per asset instructions (- 200'). 10. Freeze protect well to 2500' TVD 11. Set BPV, RDMO. Post - Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Set generic GLV's with SL. 3. Set liner top packer if needed with slickline & test to 2,400psi. Troy Jakabosky CTD Engineer 564 -4868 CC: Well File Sondra Stewman/Joe Lastufka TREE .= CM/ WELLHEAD = MCEVOY • D-29 SAFAI•1OTES: ** *CHROME TBG & LNR* ** I ACTOATOR= BAK,ERC KB. ELEV = 70.8' 1 11 44 ' BE ELEV = 44.39' 1 4 4 Il • 2099' H9-5/8" HES ES CEMENTER I KOP = 3700' 9 -5/8" CSG, 40#, 2156' 1 1 1 1 1 Max Angle = 37° @ 6100' L -80 HYD 563, 11 1 • 2112' H4-1/2" HES X NP, ID = 3.813" I Datum MD = 9796' 1 �1�/ Datum TVD = 8800' SS ID = 8.835" 2115' H 9 -5/8" ECP I 1 k# 19-5/8" BOWEN CSG PATCH H 2156' GAS LIFT MANDRELS 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2680' ST MD TVD DEV TYPE VLV LATCH PORT DATE Min 2 3519 3519 4 MMG DMY RK 0 08/25/09 1 6397 5994 37 MMG DMY RK 0 08/25/09 Minimum ID = 3.725" @ 8972' 4-1/2" HES XN NIPPLE ( 8864' H4 -1/2" HES X NIP, ID = 3.813" I 8885' —J9-5/8"X4-1/2" BKR CR S -3 PKR, ID = 3.850" I I 8909' I - f 4 - /2" HES X NIP, ID = 3.813" I I 8972' 1 - 1 4-1/2" HES XN NIP, ID = 3.725" I TOP OF 4-1/2" SCAB LNR H 8990' 4-1/2" TBG, 12.6 #, 13CR -80 VAM TOP, --I 9021' 8990' . 1 - 19 - 5/8" X 4-1/2" BKR ZXP C2 LW, ID = 6.310" I .0152 bpf, ID = 3.958" ��� 11 11 �� 9008' —19-5/8" X 4-1/2" BKR LNR HGR ID = 6.350" 3 TOP OF 7" LNR I 9100' � t 1 I 1. 1 , 6 1 1 9018' —17" X 4-1/2" XO, ID = 3.950" I 1 ∎ 1 9021' H4-1/2" MULE SHOE, ID = 3.958" I 111 ∎ 111 0 11 �1 1 , 1 1 t 1 4 9 -5/8" CSG, 47 #, L -80, m = 8.681" I 9389' 111 11 ■ 1 4 -1/2" SCAB LNR, 12.6#, 13CR -80 IBT, — 9946' A 1 ; .0152 bpf ,ID = 3.958" 1 * / ► N PERFORATION SUMMARY / # I / REF LOG: GEARHART -BHCS ON 12/06/85 1 ANGLE AT TOP PERF: 26° @ 9963' A � : Note: Refer to Production DB for historical pert data I' 4 SIZE SPF INTERVAL Opn /Sqz DATE 3-1/8" 4 9903 - 9915 S 10/09/89 3-1/8" 4 9926 - 9936 S 10/09/89 3 -3/8" 4 9960 - 10111 S 10/09/89 I 3 -3/8" 4 9963 - 9978 0 10/14/89 3 -3/8" 6 9964 - 9978 0 07/15/09 I 3 -3/8" 6 9980 - 10000 0 01/28/96 3 -3/8" 6 9982 - 10005 0 07/15/96 I 3 -3/8" 6 9985 - 10005 0 07/15/09 3 -3/8" 6 9985 - 10005 0 07/15/09 I PBTD -I 10139' I re1.1.1.1.1.1.1, ► 1 7" LNR, 29 #, L - 80, .0371 bpf, 0= 6.184" H 10165' I 10.0.0.0 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/10/85 ORIGINAL COMPLETION WELL: D-29 11/01/08 N4ES RWO _ PERMIT No: 1852530 05/14/09 HB /JMD DRLG DRAFT CORRECTIONS API No: 50- 029 - 21470 -00 07/26/09 KSB /PJC RE -PERF (07/15/09) SEC 23, T11 N, R13E, 1986' FNL & 1068' FEL 09/08/09 RPC/TLH GLV GO (08/25/09) BP Exploration (Alaska) TRH can/ D O9A p S A NOTES: CHROME TBG & LNR* I VVELLHEAD= MCEVOY ... ■• ACTUATOR = BAKE2 C KB. ELEV = 70.8' BF. ELEV = 44.39' 11 ���9 •' I 2099' H9 HES ES CEMENTER KOP = 3700' 1�� I4. 9 CSG, 40#, — 2156' 11' Max Angle = 37° @ 6100' 1.44 / 2112' —14-1/2" HES X NP, D = 3.813" L 80 HY D 563, Datum MD = 9796' ►��� i •Aj Datum TV D = 8800' D = 8.835" '�, ; .'. 2115' — I8 5/8" ECP 9 -5/8" BOVVEN CSG PATCH H 2156' 1� ��1 GAS LFT MANDRELS ' M3 TVD DEV TYPE VLV LATCH FORT DATE 13 -3/8" CSG, 72#, L -80, ID= 12.347" I— 2680' MI 3519 3519 4 WAG DMY RK 0 08/25/09 1 6397 5994 37 WAG DMY RK 0 08/25/09 Minimum ID = 3.725" @ 8972' 4-1/2" HES XN NIPPLE 8864' — I¢1/2" HESX NP, D= 3.813" ■ 8885' H9 X 4-1/2" BKR CR S-3 PKR, ID = 3.850" 8909' H4 - 1/2" HES X NP, 13 = 3.813" 8972' H4 HES XN NP, D = 3.725" TOP OF 4 -1/2" SCAB LNR H 8990' 4 -1/2" TBG, 12.6#, 13CR -80 VAM TOP, H 9021' ® I I 8990' - 19 - 5/8" X 4 -1/2" BKRZXPC2 LIP, ID= 6.310" .0152 bpf,D = 3.958" ,1, 'I II 9008' I — {9 - 5/8" X 4 -1/2" BKR LNR HGR, 1)= 6.350" ∎••• ����j 9018' I--17" X 4-1/2" XO, D = 3.950" TOP OF 7" LNR —I 9100' NV 4 1 V * , 9021' H4 -1/2" MULE SHOE, ID = 3.958" • 1 o4 • 14 4 9 -5/8" CSG, 47 #, L -80, D = 8.681" —I 9389' y , 4 y v4 • 4 -1/2" SCAB LNR, 12.6#, 13CR 801BT, H 9946' I y �1 .0152 bpf,D = 3.958" 1 • v ,• / •� 3.7" Deployment Sleeve 9650 MD, TOC PERFORATION Sl1NNM1ARY 11 REF LOG: GEARHART -BHCS ON 12/06/85 1�� ANGLEAT TOP FERF: 26° @ 9963' 1�� 10297 MD 3 -1/4 x 2 -7/8 XO Note: Refer to Production DB for historical pert data � �, ,,. _,_ SIZE SPF INTERVAL Opn/Sqz DATE • � ( 3118" 4 9903 - 9915 S 10/09/89 1 � , • 2 -7/8 4.7# L -80 3-1/8" 4 9926 - 9936 S 10/09/89 ►i • 4 -1/2 KB Packer Whipstock 9770 MD 11,127 MD 3-3/8" 4 9960 - 10111 S 10/09/89 -.,.. 3-3/8" 4 9963 - 9978 O 10/14/89 3-3/8" 6 9964 - 9978 0 07/15/09 3-3/8" 6 9980 - 10000 0 01/28/96 ' 3-3/8" 6 9982 - 10005 0 07/15/96 3-3/8" 6 9985 - 10005 0 07/15/09 ' 3-3/8" 6 9985 - 10005 0 07/15/09 I PBTD I—H 10139' I 7" LNR, 29#, L -80, _0371 bpf, ID= 6.184" H 10165' DATE REV BY COMMENTS DATE REV BY COMENTS FRLAHOEBAY UNIT 11/10/85 ORIGINAL COMPLETION W8L: D 11/01/08 N4E5 IMO PERMT No: 1852530 05/14 /09 HB/JMD DRLG DRAFT CORRECTIONS AR No: 50- 029 - 21470 -00 07/26/09 KSB/PJC R€PERF (07/15/09) SEC 23, T11 N, R13E, 1986' FNL 8 1068' Fa 09/08/09 RF'CJTLH GLV CIO (08/25/09) BP Exploration (Alaska) e NORDIC — CALISTA RIG 1 CHOKE / REEL /CIRCULATION MANIFOLD DIAGRAM • V12 IBBaI • V14 _.: 7 -1/18" 5000 psi BOP's ID = 7.06" V15 V11 ' — I T 1/16" 5000 psi, Rx-48 Transducer 0 1 i r 1 7 � OOR BO V2 II V1 V 16 --lie rte +EGASSE- , Note: typical SOP ar gemem for 2-018 coiled tubing drilling .'� ( s . . I '/ 1/18" 6000 Psi, RX-40 I q ill 7 V17 a HCR I �' 1K OK au To Poor Boy Gas Buster _ l ' - i =i • 1 :6 i V18 V19 f , = 2 1/18" 5000 Psi, R% -24 lhIMIIIIIIIprr l • 3.00" 6000 psi HCR I I ■ ��.." 3.1116" 5000 Psi CHECK VALVE I Manual Choke r H III.... 7 1/18 Cameron FOV Gate I Valves 5000 Psi 1`I lil— MEO /Diesel , .. FP Line CoFlea Hose . =. vi ` ," on - 1/4 Turn Halco 10WOG To Production Tree or Cross Over • I 0 • T r e transducers CoFlea Hose CV11 1' CV12 To Coiled Tubing Bleed Off _ L = 6 B g Inner Reel Valve CV13 Ceme in Tie -in Ground Lev CV10 1 • -i CV3 CV2 / T Stand Pipe *. sw • — _ — - � e- ----""' Manual Choke — ... ,. — _ '"---%;--:: __ ____ _ ______ _ Pressure Transducers V I CV9 ', r 0 nLlIPMII CV17 11 ill CV1 _ �I� MP MP' MEI 118 _ {,_ lI Tiger Tank Mud Pump 2 ' 1 _ In From O = Ba MP 1 & MP 2 ► Choke • - " - — • CV14 to Pits --- Rig Floor Mud Pump M1 " CV16 Reverse Cl .�'�• '� ' Cir CT while 0011 � . — • • To Manifold CV15 1-Jun-2010 Memo rif,..Winn lire. I CT while 0011 CoFks Hose • • Page l of l 1 Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE -DRILL WELLS (IPBRD) Type Work Code in RBDMS 1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art / or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 L/ form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). 2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve / D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and V operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter the existing code " IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10 -407 into RBDMS. 5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file: //F:\ Daily_ Document_ Record \Procedures_Instructions \FW INTENT PLUG for RE- DRI... 4/6/2012 • • bp BP Exploration (Alaska) Inc. z, . f Attn: Well Integrity Coordinator, PRB -20 • Post Office Box 196612 Anchorage, Alaska 99519 -6612 March 06, 2011 '4Z5-� 5 3 y '� FT'� t 'P✓ �, RECEIVED' Mr. Tom Maunder Oil and Gas Conservation Commission 333 West 7 Avenue COMMISSION Anchorage, Alaska 99501 # ���` Inctlorhgc Subject: Corrosion Inhibitor Treatments of GPB D Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from D Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator v BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 03/04/11 Corrosion • Initial top ,Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # of cement pumped cement date inhibitor sealant date ft bbls ft na gal 0 -01A 1970780 50029200540100 NA N/A NA N/A 1/31/2011 D -03A 2001340 50029200570100 NA 14 NA 100.30 1/19/2011 D -04B 2031100 50029200560200 NA 4 NA 56.10 2/19/2011 D -05 1700060 50029200580000 NA 0 NA trace 1/19/2011 D -06A 1970430 50029201480100 NA 0.5 NA 3.40 1/7/2011 D -07B 2051810 50029201620200 NA 0.5 NA 3.40 1/7/2011 D -08A 2021230 50029203720100 NA 0.5 NA 3.40 2/9/2011 D -09A 1990850 50029203810100 NA 0.7 NA 3.40 1/19/2011 0-10 1790530 50029203890000 NA 2.3 NA 8.50 3/2/2011 D -11B 2100770 50029204350100 NA 3.5 NA 23.80 1/6/2011 D -12 1800150 50029204430000 NA 1.3 NA 5.10 1/15/2011 D -13A 2000810 50029204490100 NA 0.5 NA 2.55 3/31/2010 D -14A 1961530 50029204500100 NA 0.2 NA 0.85 1/15/2011 D -15A 1972120 50029204610100 NA 0.2 NA 0.85 1/15/2011 D -16A 2090250 50029206830100 NA 0.1 NA 0.85 2/20/2011 III D -17B 2021110 50029206920200 NA 1 NA 3.40 2/19/2011 D -18A 2011030 50029206940100 NA 5.4 NA 34.00 2/20/2011 D -19B 2011120 50029207070200 NA 0.8 NA 3.40 2/19/2011 D -20 1820440 50029207800000 NA 0.5 NA 1.70 2/19/2011 D -21 1820520 50029207880000 NA 0.2 NA 3.40 2/10/2011 D -22C 2081210 50029207370300 NA 0.2 NA 0.85 2/10/2011 D -23A 1961880 50029207380100 NA 13.5 NA 93.50 3/1/2011 D -24 1852990 50029215060000 NA 0.9 NA 6.80 1/8/2011 D -25A 2000240 50029215220100 NA 6 NA 32.30 1/15/2011 D -26B 2060980 50029215300200 NA 0.8 NA 3.40 2/19/2011 0-27A 2051930 50029215430100 NA 0.3 NA 1.70 2/10/2011 D -28B 2090890 50029215560200 NA 0.3 NA 1.70 2/10/2011 �� D -29 1852530 50029214700000 NA 13.3 NA 27.20 1/16/2011 D -30B 2061840 50029226460200 NA 2.2 NA 13.60 12/25/2010 D -31A 1960950 50029226720100 NA 3.3 NA 27.20 1/19/2011 0 -33 1960360 50029226520000 NA 2.2 NA 18.70 1/8/2011 STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMMI~ON REPORT OF SUNDRY WELL OPERATIONS ~~~~ ~~~ 8~~~ 4 ~~~~~,~ vi~~~i.. ~ ~ %~~i;fi 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate~ Other ~ ri . r Performed: Alter Casing ~ Pull Tubing ~ PerForate New Pool ~ Waiver~ Ti ~ rP~i~ ~•$,a,+~`= ,,:~~ra#~p ~, ;~~,; Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Well ~° 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~ Exploratory I~ 185-2530 3. Address: P.O. Box 196612 Stratigraphic 1~" Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-21470-00-00 7. KB Elevation (ft): 9. Well Name and Number: 70.84 KB PBU D-29 8. Property Designation: 10. Field/Pool(s): ADLO-028285 PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 10171 feet Plugs (measured) None true vertical 9207 feet Junk (measured) None Effective Depth measured 10139 feet true vertical 9179.28 feet Casing Length Size MD ND Burst Collapse CONDUCTOR 110 20" SURFACE - 110 SURFACE - 110 SURFACE 2680 13-3/8" 72# L-80 SURFACE - 2680 SURFACE - 2680 4930 2670 PRODUCTION 9389 9-5/8"47# L-80 SURFACE - 9389 SURFACE - 8508 5750 3090 LINER 1065 7" 29# L-80 9100 - 10165 8254 - 9203 7240 5410 SCAB LINER 956 4-1/2" 12.6# 13CR-80 8990 - 9946 8158 - 9006 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR-80 28 - 9021 0 0 - Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BKR CR S-3 PKR 8885' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): r " ~ at+9~~'~" ~"r ~ i ; t ~ ~ ` `~ ( ~ *' ~s ° . ~: .L ~~ E ~~7 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 488 24896 145 227 Subsequent to operation: 474 24279 127 300 14. Attachments: 15. Well Class after oroposed work: Copies of Logs and Surveys Run Exploratory ~` De~elopment ~ Senrice ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil I~ Gas ~ WAG r GINJ ~ WINJ I~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 7/23/2009 Form 10-404 Re sed 04/2006 ~ ~~~,~ ~;; ~~• Submit rigi al O ly ~ :r ~ ~. ~-~f~ .~-~~~~'~ D-29 185-253 PFRF ATTOCHMFNT • • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base D-29 8/13/86 PER 9,903. 9,915. 8,967.3 8,978.08 D-29 8/13/86 PER 9,926. 9,936. 8,987.96 8,996.95 D-29 1/10/88 APF 9,960. 10,000. 9,018.51 9,054.45 D-29 10/8/89 SQZ 9,926. 9,936. 8,987.96 8,996.95 D-29 10/8/89 SQZ 9,960. 10,000. 9,018.51 9,054.45 D-29 10/8/89 SQZ 9,903. 9,915. 8,967.3 8,978.08 D-29 10/14/89 RPF 9,963. 9,978. 9,021.21 9,034.69 D-29 1Q/25/89 APF 10,000. 10,005. 9,054.45 9,058.94 D-29 10/25/89 RPF 9,984. 10,000. 9,040.08 9,054.45 D-29 1/3/96 SPS 9,982. 10,005. 9,038.28 9,058.94 D-29 1/25/96 RPF 9,982. 10,005. 9,038.28 9,058.94 D-29 1/28/96 APF 9,980. 10,000. 9,036.48 9,054.45 D-29 7/15/96 RPF 9,982. 10,005. 9,038.28 9,058.94 D-29 10/6/05 BPS 9,101. 9,102. 8,254.53 8,255.4 D-29 9/28/08 BPP 9,101. 9,102. 8,254.53 8,255.4 D-29 10/1/08 SPS 9,956. 9,985. 9,014.92 9,040.98 D-29 10/3/08 BPS 9,133. 9,134. 8,282.4 8,283.27 D-29 10/21/08 BPP 9,133. 9,134. 8,282.4 8,283.27 D-29 10/23/08 SQZ 8,990. 9,946. 8,158.47 9,005.93 D-29 10/23/08 MIS 8,990. 9,946. 8,158.47 9,005.93 D-29 12/2/08 SPR 9,956. 10,006. 9,014.92 9,059.84 D-29 7/13/09 APF 9,964. 9,978. 9,022.11 9,034.69 D-29 7/13/09 APF 9,985. 10,005. 9,040.98 9,058.94 D-29 7/14/09 APF 9,964. 9,978. 9,022.11 9,034.69 D-29 7/14/09 APF 9,985. 10,005. 9,040.98 9,058.94 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • ~ D-29 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY FLUIDS PUMPED BBLS 1 METH 1 Total ~ ,~~ STATE OF ALASKA ~p-0~ ~,-,~ ~ ~ ALl~AA OIL AND GAS CONSERVATION CO SIGN r'~'~ _ ~ REPORT OF SUNDRY WELL OPETIONS 1. Operations Performed: ^ Abandon ®Repair Well . ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ®Alter Casing ®Pull Tubing , ^ Perforate New Pooi ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: 8P Exploration (Alaska) Inc. ®Development _ ^ Exploratory 185-253 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21470-00-00 7. KB Elevation (ft): 70 84' 9. Well Name and Number: PBU D-29 8. Property Designation: 10. Field /Pool(s): ADL 028285 - , Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 10170'- feet true vertical 9207' - feet Plugs (measured) None Effective depth: measured 10139' feet Junk (measured) None true vertical 9179' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2680' 13-3/8" 2680' 2680' 4930 2670 Intermediate Production 9389' 9-5/8" 9389' 8508' 5750 3090 Liner 1065' 7" 9100' - 10165' 8254' - 9203' 7240 5410 Scab Liner 956 4-1/2" 8990' - 9946' 8158' - 9006' 8430 7500 ~~~~~% ~~~ ~ ~' Z~~~ Perforation Depth MD (ft): 9963' - 10005' Perforation Depth TVD (ft): 9021' - 9059' 4-12", 12.6# 13Cr80 9021' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker'S-3' packer 8885' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut and pull tubing. Run 4-1/2" (12.6#, 13Cr80) Scab Liner and cement w/ 30 Bbls Class'G' (168 cu ft / 145 sx). Cut and pull 9-5/8" casing from 2156'. Run 9-5/8" (40# / 47#, L-80) Tieback and cement to su rface w/ 144 BBIs Class 'G' (809 cu ft / 697 sx). Run new Chrome completion. 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Glass after work: _ ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ^ Well Schematic Diagram ®bil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Hank Baca, 564-5444 30g-3,44 Printed Name Terris Hubble Title Drillin Technolo ist ' nn i;~~1;; Prepared By Nama/Number v Signature Phone 564-4828 Date v~ Terris Hubble 564-x628 Form 10-404 Revised 04/2006 Submit Original Only . ~~ ~ ~~~-~ ~a+ i~~ ~ ~~ ~t~o~ ~a~~ • • D-29, Well History (Pre Rig Workover) Date Summary 9/27/2008 WELL S/I ON ARRIVAL. RU S/L UNIT. RAN 3.50" LIB DOWN TO 8988'SLM, (STICKY) NO IMPRESSION. 9/28/2008 BAIL ASPHALTINES & PLASTIC COATING FROM 8989' SLM TO 8996' SLM, - 13 GAL OF FILL. PULLED PX PLUG FROM 9020' MD. 9/29/2008 LOC TTL W/ 3.7" CENT/TEL/SAMPLE BAILER C~1 9132' SLM + 26' - 9158' ELM. S/D C~3 9276' ELM. NO SAMPLE. (TARGET DEPTH FOR JET CUT IS -9000' ELM) LEFT WELL SI, TURNED OVER TO PAD OP. 9/30/2008 WELL SHUT IN ON ARRIVAL. RAN TEL/3" DD BAILER. LOCATE TT C~ 9121' SLM + 37' = 9158' ELM., EGGED F LL Q 9995' ELM. HAVE PC RETURNS IN BAILER. WELL LEFT SHUT IN PAD OP NOTIFIED OF DEPARTURE. 10/1/2008 MIRU/RIH w/2.25 BDN. ~ t^~ ^t 99Fi7 r•.tmd - CAYfPCt to 9995 Plmd heaed nn nrPVious SI rnrrartArl Pi~mp__10 hbls slurry of 20/40 river Gand_ Lay sand from TD to 9335', PUH to safe. Wait 2 hrs for gel to break. RBIH and drv taa Too of Sand C«3 9956' corrected elmd. POOH filling coil voidage. FP well circulating 50/50 from 2100'. Secured well. Well to remain SI. Job Complete. 10/3/2008 WELL S/I ON ARRIVAL. AFT PXN TTP IN XN NIPPI F Cad 9133' MD SFT "P" PRONG Cc~ 917Fi' SI M, LRS CURRENTLY RIGGING UP TO MIT-T. LEFT WELL SI, TURNED OVER TO PAD OP. 10/4/2008 T/I/0= 60/340/50. Assist Slickline (RWO prep). MIT-T *PASSED* to 1000 nsi. Pumped 2.5 bbls of neat methanol to achieve test pressure. Lost 30 psi / 10 minutes. Bled back to final WHP = 240/340/50. Annulus casing valves are open to gauges. Valve positions verified with operator at permit closure. 10/5/2008 SWAB, WING CLOSED ON ARRIVAL. SSV, MASTER, CASING VALVES OPEN ON ARRIVAL. INITIAL T/I/O = 0 / 375 / 0 PSI. CUT TUBING AT 9000' WITH 3.65" SLB POWERCUTTER. FINAL T/I/O = 0 / 325 / O PSI. SWAB, WING CLOSED; SSV, MASTER, CASING VALVES OPEN ON DEPARTURE. JOB COMPLETE. 10/7/2008 T/I/0=100/280/0, Temp=S1. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: External check installed. Stung into test void (0 psi). Functioned LDS, 2 were tight but moving, the rest moved freely (2.75"). Pumped through void, clean returns. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: External check installed. Stung into test void (100 psi), unable to bled to 0 psi. Functioned LDS, one LDS is broken will need to be drilled, the rest moved freely (2.75"). RU elephant gun to packing port, pumped 1 stick J stick plastic to re-energize secondary Y seal. Bled void to 0 psi. Pumped through void, clean returns. Pressured void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. 10/9/2008 T/I/0= 0/260/0. Circ Out well (RWO prep). Pumped 5 bbls neat, 956 bbls of 1 % KCL, and 138 bbls of heated diesel into the TBG while taking IA returns to D-03's flowline. U-Tubed TxIA for 60 minutes. Freeze protected IA jumper to D-03 with 5 bbls of diesel. _CMIT TxIA *PASSED* to 1000 psi. Pumped 0.4 bbls to achieve test pressure. TxIA lost 40 psi / 1st 15 min & 20 psi / 2nd 15 min for a total of 60 psi during the 30 minute test. Bled back - 2 bbls to 0 psi. Bleed OA gas to 0+ psi. Annulus casing valves are open to gauges. DHD took well control upon our departure. Page 1 of 2 • D-29, Well History (Pre Rig Workover) Date Summary 10/10/2008 T/I/0=0/0/0, Temp=S1. Drill out broken LDS on casing hanger (pre RWO). Stung into IC test void to verify 0 psi. Removed gland nut and broken LDS shaft. RU Wachs drill and drilled out remaining LDS parts (threads and nose). Installed new LDS assembly. Pressure test IC test void to 3500 psi for 30 min lost 100 psi/15 min, 0 psi/30 min, test good. 10/10/2008 T/I/O = Vac/Vac/25. Bleed WHPs to 0 pre PPPOT T & IC. Little Red on site upon arrival, finishing a circ out. Wellhouse and flowline removed, drilling scaffold on well. Bled OAP from 25 psi to 0 psi in 60 minutes. SV, WV, MV =Closed. SSV =Open. IA, OA = OTG. NOVP. 10/13/2008 T/I/0=vac/0/0; Set 4-1/16" CIW "H" BPV #253 thru tree for 4ES pre-rig; 1-2' ext. used, tagged Q 102". Complete. 10/14/2008 T/I/0= Vac/0/0. Temp= SI. Eval Cellar for type of liner. No well house on the well. Flowline disconnected. The cellar box is 10' x 10' metal. Ice is currently on the floor best guess is about 3' to 3 1/2' deep. (The spray in liner is the best choice, a catch can should fit if some gravel is removed). 10/17/2008 T/I/O =Vac/0/0 Pulled 4-1/16" CIW "H" BPV # 253 thru tree. Tag C~? 96", 1-2 ext. used for rig move -on. No problems. Page 2 of 2 BP EXPLORATION Page 1 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 4ES Date From - To Hours Task Code II NPT Start: 10/14/2008 Rig Release: 11/1/2008 Rig Number: Spud Date: 11 /21 /1985 End: Phase ' Description of Operations 10/17/2008 08:00 - 10:00 2.00 RIGD P PRE I Rig down pipe shed pits and sub. J 10:00 - 13:00 3.00 RIGD N WAIT PRE Wait for well cellar on D-29 to be prepped with liquid tight liner. 13:00 - 15:00 I 2.001 RIGD I P 15:00 - 17:00 2.00 MOB P 17:00 - 22:00 5.00 RIGU P 22:00 - 23:00 1.00 KILL P 23:00 - 00:00 1.00 KILL P 10/18/2008 00:00 - 01:30 1.50 ~ KILL P 01:30 - 02:00 0.50 KILL P 02:00 - 05:30 3.50 KILL P 05:30 - 06:00 0.50 KILL P 06:00 - 08:00 2.00 DHB P 08:00-10:30 ~ 2.50~WHSUR~P 10:30 - 13:00 2.50 BOPSUF~ P 13:00 - 14:00 1.00 BOPSU P 14:00 - 20:00 6.00 BOPSU P 20:00 - 20:30 0.50 BOPSU P 20:30 - 21:30 1.00 WHSUR P 21:30 - 22:00 0.50 PULL P ' 22:00 - 00:00 2.00 PULL P 10/19/2008 00:00 - 00:30 0.50 PULL P 00:30 - 01:00 0.50 PULL P 01:00 - 03:30 2.50 PULL P 03:30 - 04:00 0.50 PULL P 04:00 - 06:00 2.00 PULL P PRE Scope down and lay over derrick. Move pits and pipe shed. Pull sub off well. prepare to move rig from B-35 to D-29. PRE Move rig and components to D-29 from B-35. PRE Lay herculite and spot rig components and berm rig. Derrick raised C~ 2200 hrs (Accept Rig ~ 2200 hrs) DECOMP R/U lubricator and test to 500 psi, pull BPV (tubing on vac) DECOMP R/U lines to open top tank to take diesel returns and tiger tank to take the rest. Take 110 degree sea water into pits DECOMP Cont. R/U lines to take diesel returns to open top tank and sea water to tiger tank DECOMP Hold PJSM with all hands for well kill operation. DECOMP Fill lines with 110 degree sea water and test lines to 3500 psi. Pumped 130 strokes before we saw returns. Pumped ~ 3 BPM 220 psi to open top tank, recovered 100 BBLS of diesel, swayed over to tiger tank pumped 5 BPM @ 650 psi, OA press ~ 80 psi DECOMP Monitored well and confirmed that well was dead. DECOMP Installed TWC and tested from below to 1000 psi for 10 charted minutes and from above to 3500 psi for 10 charted minutes. DECOMP ND tree -encountered 1 broken lock down screw that had to be ground out. DECOMP NU BOPEs DECOMP Held weekly safety meeting with the day tour. Discussed recent HSE incidents from around the field, stop cards, BP's vehicle idling policy, and traction devices. DECOMP OPE testin 250/3500 si for 5 charted minutes each -tested choke manifold and valves, annular with a 3-1/2" test jt; tested VBRs with 3-112" and 4-1/2" test joints; iBOP;TIW valve; and Kelly. Performed accumulator drw down test. Testing performed in accordance with AOGCC regulations and BP policy. Witnessed by Bob Nobel. DECOMP Clear floor of test equip. DECOMP R/ n DECOMP M/U UJ into hanger. BOLDS (monitor annulus @ 0 psi) Pull hanger 110 K pulled off seat pulled to floor 125 K. Terminate CCL's and UD hanger. DECOMP R/U circ. lines. Circ. btms up (8200 strokes) ~ 56PM 260 psi max press. DECOMP R/D circ. equip. and clean and clear floor. DECOMP Monitor well (static) DECOMP POH with 4.5" L-80 BT t Spool CCL onto Schlumb. spooling unit, recover bands and clamps, (3 SS bands & 25 Clamps recovered) All appeared to be recovered. DECOMP UD ball valve and spooling unit DECOMP POH with 4.5" L-80 BTC tubing laying down 1x1 to pipe shed. 06:00 - 06:30 0.50 PULL P DECOMP Crew change. Service rig. Check PVT alarms. Inspect derrick. 06:30 - 11:00 4.50 PULL P DECOMP Cont. POH with 4.5" L-80 BTC tubing laying down 1x1 to pipe shed. Tubing is very pitted on the inside. Recovered 213 full Nnntea: i uz5rtuue i i:uu:s3 r+nn • • BP EXPLORATION Page 2 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours ', Task Code ~ NPT Phase Description of Operations 10/19/2008 06:30 - 11:00 4.50 PULL P DECOMP jts. and 1 cutjt. of 4-1/2" 12.6#, L-80 BTC tubing, 6 - 4-1/2" GLM's. Pipe condition poor due to severe internal pitting. Cut joint length = 21.10', O.D. of cut = 4.95". Photos of jet cut e-mailed and copied to town server. 11:00 - 13:30 2.50 PULL P DECOMP Clear & clean rig floor. Rig up to RIH w/DP. 13:30 - 15:00 1.50 CLEAN P DECOMP PUMU BHA #1: 8-1/2" BIT 9-5/8" S r XO, XO, 6 ` 6-1/4" drill collars & XO. Ttl Length = 192.98. 15:00 - 18:30 3.50 CLEAN P DECOMP RIH w/BHA #1 on 3-1/2" DP 1x1 from pipe shed. RIH to 4018' 18:30 - 19:30 1.00 CLEAN P DECOMP CBU at 5 BPM 670 psi (4327 strks) Monitor well. 19:30 - 21:00 1.50 CLEAN P DECOMP POOH from 4018' standing back 3 1/2" DP in derrick. (41 stands) 2) stands of 6 1/4" DC's stood back. 21:00 - 21:30 0.50 CLEAN P DECOMP VD Bit, scraper, and X-O's 21:30 - 23:30 2.00 EVAL P DECOMP Spot E-Line unit. Hold PJSM with all hands. R/U E-Line w/ 9 5/8" USIT 23:30 - 00:00 0.50 EVAL P DECOMP RIH w/ USIT logs in cement evaluation, and corrosion mode. 10/20/2008 00:00 - 02:30 2.50 EVAL P DECOMP Cont. RIH with USIT log in cement evaluation and corrosion mode. RIH to 4050' and POOH. (Hold Weekly safety meeting with crew) TOC estimated ~ 2214' 02:30 - 03:00 0.50 EVAL P DECOMP R/D E-Line equip. 03:00 - 03:30 0.50 WHSUR P DECOMP Set wear bushing. 03:30 - 05:00 1.50 EVAL P DECOMP M/U BHA #2. Overshot with hollow mill container, overshot ext. with 4.5" grapple, bumper sub, jars, 9) 6 1/4" DC's, intensifier, pump out sub 05:00 - 06:00 1.00 FISH P DECOMP RIH with BHA #2 06:00 - 06:30 0.50 FISH P DECOMP Crew change. Check PVT alarms. Service Rig. Inspect derrick. 06:30 - 08:00 1.50 FISH P DECOMP RIH with BHA #2 on DP from derrick (41 stands). 08:00 - 11:00 3.00 FISH P DECOMP Continue RIH with BHA #2 on DP picked up jts 1 x 1 from pipe shed. 258 Jts RIH. 11:00 - 11:30 0.50 FISH P DECOMP PJSM -Slip and cut drilling line. t 11:30 - 12:00 0.50 FISH P DECOMP Slip and cut drilling line (84'). ~'1~ ~~ 12:00 - 13:30 1.50 FISH P DECOMP Continue to RIH with BHA #2 on DP picked up jts 1 x 1 from pipe shed. 279 Jts total. Tagged fish C«~~~LD 1 jt and picked up 10' pup from pipe shed. Picked up Kelly and tagged up 20' in on Kelly. 13:30 - 15:00 1.50 FISH P DECOMP Established fishing parameters: PU 165K; SO 120; ROT 142K; Torque 3-4K; 50 RPM; pumping 2 BPM C~ 160 psi. Began dressing tubing stub. Dressed off stub and swallowed ~5' withg pvershot Picked up and seated grapple 15:00 - 15:30 0.50 FISH P DECOMP Jar on fish. Work up to 100K overpull. Fish came free. Went back down and tagged up 4' higher than previous tag depth. 15:30 - 18:00 2.50 FISH P DECOMP Monitored well and circulated 18:00 - 18:30 0.50 FISH P DECOMP Crew change. Check PVT alarms. Service Rig. Inspect derrick. 18:30 - 23:00 4.50 FISH P DECOMP Pull 10 stands of 3 1/2" DP standing back in derrick. Flow check well. Cont. POOH with 3 1/2" DP to BHA. 23:00 - 00:00 1.00 FISH P DECOMP L/D BHA #2. Stand back 3) 6 1/4" DC's and L/D rest. 10/21/2008 00:00 - 00:30 0.50 FISH P DECOMP Continue lJD BHA #2 NO FISH Looks like fish was in grapple, lots of scale and iron on grapple. Guide shoe has approx. 3" groove cut into side of it. Pictures sent to Anchorage. 00:30 - 02:30 2.00 FISH C DECOMP Wait on new Baker guide shoe and X-O's. Clean and clear rig floor. Printed: 11/25/20013 11:W:JJ AM • • BP EXPLORATION Page 3 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: .bate From - To Hours Task Code NPT Phase Description of Operations 10/21/2008 02:30 - 04:30 2.00 FISH P DECOMP Break out X-O sub and M/U BHA #3 Overshot guide, hollow mill cont., overshot bowl, bushing, washpipe, drive sub, dbl pin sub, bit sub w/ float,x-o, bumper sub, oil jar, x-o, 9) 6 1/4" DC's, x-o, intensifier, x-o, pumpout sub 04:30 - 06:00 1.50 FISH P DECOMP RIH with BHA #3 and RIH with 3 1/2" DP from derrick 06:00 - 06:30 0.50 FISH P DECOMP Crew change. Check PVT alarms. Inspect derrick. Service rig. 06:30 - 09:00 2.50 FISH P DECOMP Cont. RIH with BHA #3 and RIH with 3 1/2" DP from derrick. Tag and engage fish at 8975' w/92 stds. + 1 jt. 09:00 - 10:00 1.00 FISH P DECOMP Kelly up. Establish fishing parameters: P/U Wt. = 160K, S/O Wt. = 130K. Circulate 35-Bbl. EP Mud Lube pill to DP annulus C~ 5.0-bpm @ 1050-psi. 10:00 - 10:30 0.50 FISH P DECOMP Straight pull on fish to 260K. Let jars trip and increase straight pull back to 260K. Monitor well for fluid losses with 260K pick up weight to try and determine if bypass is finctioning in FLH packer. No sian of fluid losses from packer bvoass op -n~inv- 10:30 - 11:10 0.67 FISH P DECOMP Jar on fish w/100K overpull. Worked fish upwards and then moved top of fish downhole 31' to 9006'. No fluid losses noted while working pipe. 11:10 - 13:00 1.83 FISH P DECOMP POH with pipe dragging from 160K to 260K. Pulled and stood back 3 stands DP. Stabbed TIW valve, closed annular preventer and pressured up on I/A to 1500-psi to try to move fluid past packer with no success. Bled off pressure and pulled TIW valve. POH and stood back 1 stand with pipe continuing to drag up to 260K. 13:00 - 14:00 1.00 FISH P DECOMP Stabbed TIW valve and closed same. Work pipe to try to relieve dragging. Well began taking fluid and pick up weight dro ed to 170K. Hooked up cement line and broke circulation. Circulated hole while working pipe. 14:00 - 15:00 1.00 FISH P DECOMP RIH to 9067' to verify fish still engaged in overshot. Hole still taking fluid. Fish appears to be still engaged with overshot; 15:00 - 16:30 1.50 FISH P DECOMP POH standing DP in derrick. Fish dragging with 10-15K overpull. POH w/38 stds. DP using constant hole fill. Fluid losses = 7-8 BPH. Stopped POH w/38 stands pulled to monitor well for fluid losses. Measured fluid losses = 4.5-bph. 16:30 - 18:00 1.50 FISH P DECOMP Continue POH w/BHA #3 and fish. 63 stds. DP pulled at 17:30-hrs. 18:00 - 18:30 0.50 FISH P DECOMP Crew Change. Service Rig. 18:30 - 20:00 1.50 KILL N DPRB DECOMP Well started flowin .Stab floor valve nd sh I ' .Took a 12 bbl pit gain. 0 psi on tubing and 80 psi on the IA. Pipe depth at 3,002'. Notified Operations Manager and AOGCC (Bob Noble) of situation and plan forward. Circulate out gas through choke manifold and gas buster. 4 bpm at 380 psi. lost 70 bbls of seawater during circulation. 8.5 ppg seawater returns. Discuss options with Operations Manager, decision made to bullhead 1.5 times wellbore volume with Little Red rigged up to get higher pump rate with 2,500 psi maximum pressure 20:00 - 23:00 3.00 KILL N DECOMP Monitor well while waiting on Little Red pump unit and seawater trucks to arrive on location. 23:00 - 23:30 0.50 KILL N DECOMP Hold safety meeting with all personnel involved in bullheading operations. 23:30 - 00:00 0.50 KILL N DECOMP R/U Little Red to IA and test lines to 3,700 psi. Spot vac trucks. 10/22/2008 00:00 - 02:30 2.50 KILL N DPRB DECOMP Bullhead 1000 bbls of seawater. Little Red Pumping down the Printed: ~ vz5rz2uua 11:UU:JJ AM • • BP EXPLORATION Page 4 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: Date 10/22/2008 From - To Hours Task Code NPT Phase 00:00 - 02:30 02:30 - 03:30 03:30 - 06:00 06:00 - 08:30 08:30 - 10:00 10:00 - 12:00 12:00 - 12:30 12:30 - 14:00 14:00 - 17:30 17:30 - 18:30 18:30 - 19:30 19:30 - 21:00 21:00 - 00:00 10/23/2008 00:00 - 02:00 02:00 - 03:30 03:30 - 04:30 04:30 - 07:30 07:30 - 09:00 Description of Operations 2.50 1.00 2.50 2.50 KILL KILL FISH FISH N N P P DPRB DECOMP DECOMP DECOMP DECOMP IA and the rig pumping down the Drill pipe. Initial rate of 6 bpm with 2,500 psi going to 7.5 bpm with 2,500 psi. Pressure bled to 0 psi. IA and Drill pipe on a Vac. Open well and monitor. Fill backside and establish loss rate of 24 bbls/hr. POOH from 3,002' standing back 3-1/2" DP. Breakout and la own BHA # nd fish. recovered, 4-1/2" cut jt., PBR, Otis sliding sleeve, Baker 9-5/8" FLH packer, 1 jt. 4-1/2" tbg, X nipple, 1 jt. 4-1/2" tbg., XN nipple w/PX plug, 1 jt. 4-1/2" tbg., and shear out sub. Punched holes in tailpipe above and below packer, above and below XN nipple to relieve any possible trapped pressure. Pressure was only encountered below XN ni le due to resence of PX lu in ni le. 1.50 FISH P DECOMP Clear and clean floor. 2.00 BOPSU P DECOMP BOLDS. Pulled wear ring. Set test plug and pressure tested annular preventer per BP/AOGCC requirements to 250-psi Lo/3500-psi Hi with 3-1/2" test joint. Pulled test plug and reset wear ring. Ran in 2 lockdown screws. Notified AOGCC-Jim Regg via a-mail of well control event and actions taken to mitigate situation. 0.50 CLEAN P DECOMP PJSM -Crew reviewed BHA handling procedure. 1.50 CLEAN P DECOMP PUMU BHA #4: 6-1/8" bit bit sub, 28 jts. 3-1/2" DP, double pin sub, 9-5/8" scraper, bit suub, X0,6-1/4" LBS, XO, 6-1/4" oil jar, XO, 9 ' 6-1/4" drill collars and XO. Ttl. length = 1176.03. Maintain constant hole fill pumping across top with charge pump. Losses = 14 BPH. 3.50 CLEAN P DECOMP RIH w/BHA #4 on 3-1/2" DP from derrick. 1.00 CLEAN P DECOMP RIH w/BHA #4 on 3-1/2" DP picking up from pipeshed. Tag top of fill at 9 938'. 1.00 CLEAN P DECOMP Pick up Kelly and establish parameters. Up weight 170K, Down weight 144K, Rotating weight 157K, 4 bpm with 720 psi. Wash from 9,938' to 9 956'. 2 - 10K WO, 50 rpm 1.50 CLEAN P DECOMP Reverse circulate well clean 2 bottoms u .Scale sand and rubber cuttin s back to surface. Worked pipe 90' and checked for fill. Worked to 9,956' with no fill. 3.00 CLEAN P DECOMP POOH with BHA #4, UD 25 joints of 3-1/2" DP and continued POOH standing back 3-1/2" DP in derrick. Maintain continuous holefill with seawater. 2.00 CLEAN P DECOMP POOH with BHA #4 standing back 3-1/2" DP in derrick. Maintain continuous hole fill with seawater. 1.50 CLEAN P DECOMP Break out and UD BHA #4. Several chunks of rubber were wedged in cones on bit. 1.00 CLEAN P DECOMP Clear and clean rig floor. 3.00 CASE P TIEB1 Ri u handlin a ui ment for runnin 4-1/2" Scab Liner PUMU scab liner shoe track as follows: 4-1/2" Halco float shoe, 20' 4-1/2" pup, 4-1/2" Halco float collar, 20' 4-1/2" pup and 4-1/2" Baker landing collar. Baker-Lok'd all connections below joint #1 in running order. 1.50 CASE N WAIT TIEB1 Found that centralizer sent out by Stores are for 3-1/2" tubing instead of 4-1/2" centralizers which is the size we need for the scab liner. Waiting on Stores to send proper size centralizers. Pulled liner shoe track assy. from hole and stood back on floor. Closed blind rams and maintained constant hole fill with Printetl: 1125/2UU8 11:UU::i:1 AM 1 • • BP EXPLORATION Operations Summary Report Page 5 of 11 ~ Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: Date !From - To Hours '~ Task Code NPT Phase Description of Operations 10/23/2008 09:00 - 10:30 1.501 CASE P TIE61 Held 3rd quarter HSE/Operational Performance review with 10:30 - 13:00 I 2.501 CASE I P 13:00 - 14:30 I 1.501 CASE I P 14:30 - 15:30 1.00 CASE P 15:30 - 21:00 5.50 CASE P 21:00 - 22:00 1.00 CASE P 22:00 - 00:00 2.00 CEMT P 10/24/2008 100:00 - 01:00 I 1.001 CEMT I P 01:00 - 02:00 1.00 CEMT P 02:00 - 06:00 4.00 CEMT P 06:00 - 08:30 2.501 FISH ~ P 08:30 - 12:30 I 4.001 FISH I P 12:30 - 14:00 1.50 FISH P 14:00 - 15:30 1.50 FISH P 15:30 - 17:00 ~ 1.50 ~ FISH ~ P crew. Reviewed rig scorecard and had open discussion with crew regarding past performance and goals for 4th quarter 2008. Pumping across top of flow nipple to maintain full hole while in meeting. Fluid losses = 12.0-BPH. TIE61 RIH with 20 its. of 4-1/2" 12.6#, 13CR80 liner. Torque turned all connections to optimum torque of 4440 ft-Ibs. Filled liner with seawater every 5 jts. RIH. TIEB1 PUMU 9-5/8" liner top packer and hanger assy. with XO to 4-1/2" liner. Rig down 4-1/2" liner handling tools. TIE61 Rig up 3-1/2" drillpipe handling tools. TIEB1 RIH w/4-1/2" liner on 3-1/2" DP from derrick to 9 956'. Filled DP every 5 stands with seawater and maintained constant hole fill pumping across top of flow nipple with charge pump. Fluid losses holding steady at 12.0-BPH. TIE61 Rig up Baker plug head. Establish parameters, Up weight 145K, Down weight 128K. Break circulation and pump liner volume 3 bpm with 450 psi. Hold PJSM with all personnel involved in operation. TIE61 Pump 5 bbls of seawater, pressure test lines to 4,500 psi, pump 20 bbls of seawater. Pump 30 bbls of 15.8 ppa class G cement at 4 b m with 70 i. Drop drillpipe dart, observed flag trip. Displace with seawater at 5 bpm, observed latch up at 59.1 bbls, bumped plug at 72.5 bbls displacement pressure up to 3,000 psi. Cement in place at 23:25 hours. Slack off to 70K and set slips. Blead off pressure and check floats, floats holding. Rotate 20 turns to the right and release running tool. Pressure uo to 1.000 osi and pick up to pressure drop d .pump 20 bbls of seawater at 6 bpm. Slack off to 60K to set liner top packer. Did not see positive indication of packer setting. Pick and set back down rotating. Saw positive indication of acker setting. TIE61 Reverse circulate at 6 bpm with 2000 psi. Appx 3-4 bbls of cement back to surface. TIEB1 Break out and lay down Baker plug head. TIE61 POOH with Baker running tool standing back 3-1/2" Dp in derrick. Laid down liner running tools. DECOMP PUMU Halco 9-5/8" RBP. RIH and set RBP at 2260'. TOFN = 2260', COE = 2265'. Pressure tested RBP to 1000-psi for 10-charted minutes. DECOMP Rig up "Handy-Dandy" sand hopper and dump 2200# of 20/40 h sand down DP and flush with seawater. Wait one hour for sand to settle. Pumped 14-Bbls. seawater to flush drillpipe. RIH and to ed TOS C~3 2 218'. DECOMP POH and layed down RBP running tool. DECOMP HA # as follows: 8-1/4" MultiStrin Cutter (with knives wired), XO, 8-1/2" stabilizer, XO and XO on 3-1/2" DP. BHA length = 11.62'. DECOMP Kelly up. Locate casing collar with mulitistring cutter ~ 2182'. Pick d u to make casin cut at 215 '. Established cutting parameters: P/U Wt. = 47K, S/O Wt. = 47K, RPm = 70, Free torque = 1800 ft-Ibs. inital O/A pressure = 5-psi. Engage pump and commence cutting casing. Cut casing. Did not note Printed: 11/25/2008 11:00:33 AM • BP EXPLORATION Page 6 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABORS 4ES Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations 10/24/2008 15:30 - 17:00 1.50 FISH P DECOMP any increase in O/A pressure. Set kelly back and blow down same. 17:00 - 00:00 7.00 FISH P DECOMP Circulate to warm hole while waiting on Little Red Pump Truck. All pump units are busy or broke down. 110 degrees going in 108 de rees out. 10/25/2008 00:00 - 03:00 3.00 FISH P DECOMP Circulate to warm hole while waiting on Little Red Pump Truck. All pump units are busy or broke down. 110 degrees going in 108 degrees out. 03:00 - 05:30 2.50 FISH P DECOMP R/U Little Red and pump 14 bbls of diesel down DP to cut. Close annular preventer and pump hot diesel out the cut. Pressured u to 1 200 si walk ressure u to 1 800 si started to et some returns to the o en to tank. Returns appear to be dead crude. Pressure is holding at 1,800 psi, Bleed off pressure and bring pump back on line. Pressured up to 1,900 psi. Not bleeding off and not getting any returns, Watched pressure for 15 minutes. Did not bleed off. Bleed pressure off. 05:30 - 06:00 0.50 FISH P DECOMP R/D Little Red. 06:00 - 06:30 0.50 FISH P DECOMP Reverse circulate diesel out to open top tank. 06:30 - 08:00 1.50 FISH P DECOMP POH L/D BHA #5 -Multi-String casing cutter. 08:00 - 14:30 6.50 BOPSU P DECOMP Pull wear ring. Rig up test equipment and perform weekly BOPE test per AOGCC/BP requirements: 250-psi Lo/3500-psi Hi. Tested pipe rams with 3-1/2" and 4-1/2" test joints. Tested annular preventer with 3-1/2" test joint. Tested choke manifold, upper and lower kelly cock, DP dart, manual and HCR kill and choke valves and floor TIW valve. Performed Koomey test. All good. John Crisp - AOGCC waived witness test. Rig down test equipment. 14:30 - 15:30 1.00 FISH P DECOMP PUMU 9-5/8" ITCO s ear. En a e 9-5/8" casin at 23' with spear. Pull test spear to set grapple. Cameron wellhead tech. BOLDS. Unland 9-5/8" casing -worked up from 110K initial upweight to 205K upweight and unlanded hanger. Fluid u-tubing from outer annulus. Closed in annular preventer with O/A open to open top tank. Recovered 90-Bbls. dead crude into open too tank from PO/A until inner and outer annulus balanced out. 15:30 - 16:00 0.50 FISH P DECOMP MIRU LRS. PJSM -LRS and all rig crew. Reviewed pumping plan and assigned personnel to cellar, open tank and rig floor. 16:00 - 23:00 7.00 FISH P DECOMP P/T lines to 3000-psi. open up and commence pumping 140E diesel @ 1.5 BPM ~ 50-psi down 9-5/8" casing taking returns to open top tank. Returns are dead crude. Pump 158 bbls of 140E seawater down 9-5/8" casing and spot 140E diesel in the 9-5/8" x 13-3/8" annulus, 5-1/2 bpm with 120 psi. Let soak for 1 hour. Displace with 140E seawater, 6 bpm with 280 psi. Pump 140E diesel with Little Red 1.7 bpm with 60 psi, Pump 158 bbls of 140E seawater down 9-5/8" casing at 5.5 bpm with 120 psi to spot diesel in the 9-5/8"x 13-3/8" annulus. Let soak for 1 hour. Displace with 140E seawater at 6 bpm with 240 psi until clean returns. 23:00 - 00:00 1.00 FISH P DECOMP Pull 9-5/8" mandrel han er to ri floor. Break out and L/D Baker spear. Break out and L/D mandrel hanger. 10/26/2008 00:00 - 08:30 8.50 FISH P DECOMP POOH laying down 9-5/8" casing. Maintain constant holefill with seawater. Pipe is in good condition with no corrosion Printed: nizsizous 11:UU:99 AM • • BP EXPLORATION Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 4ES Date 'From - To 'Hours Task Code N'PT Phase 10/26/2008 00:00 - 08:30 I 8.50 FISH P 08:30 - 10:30 2.00 FISH P 10:30 - 11:30 1.00 FISH P 11:30 - 14:00 2.501 FISH ~ P 14:00 - 15:30 1.50 FISH P 15:30 - 18:00 2.50 BOPSU P 18:00 - 18:30 0.50 FISH P 18:30 - 20:00 1.50 FISH P 20:00 - 22:00 2.00 FISH P 22:00 - 23:00 1.00 FISH P 23:00 - 00:00 I 1.001 FISH I P 10/27/2008 100:00 - 01:00 I 1.001 FISH I P 01:00 - 03:00 2.00 FISH P 03:00 - 04:00 1.00 FISH P 04:00 - 06:00 2.00 FISH P 06:00 - 07:00 1.00 FISH P 07:00 - 09:30 2.50 CASE P 09:30 - 10:00 0.50 CASE P 10:00 - 11:30 1.50 CASE P 11:30 - 16:30 5.00 CASE P Page 7 of 11 Spud Date: 11 /21 /1985 End: Description of Operations DECOMP noticed. B/O torque around 45,000 ft/Ibs. Recovered 53 jts. 9-5/8" 47#, L-80 casing and a 11.45' cut jt. Also recovered 16 turbolator style centralizers. wo turbolator centralizers were not in place where they should have been. Though it is not thought that they are in the hole. DECOMP Clear and clean rig floor. Rig down 9-5/8" handling tools. DECOMP Rig weekly HSE meeting with day crew. Reviewed GPB HSE incidents from past week and compared those incidents to rig operations looking for commonality. DECOMP PUMU BHA #7 as follows: 12-1/8" dress off mill, 11-3/4" W.P. Extension, 11-3/4" boot basket, double pin sub, 13-3/8" scraper, bit sub, double pin sub, bit sub w/float, XO, 6-1/4" LBS, 6-1/4" oil jar, XO, 9' 6-1/4" drill collars and XO. Ttl. length = 233.15'. DECOMP RIH w/BHA #7. Reciprocated each stand while RIH. DECOMP Changeout failed upper kelly valve that failed testing during weekly BOPE test. P!T same to 250-psi Lo/3500-psi Hi. DECOMP Service rig and check alarms. DECOMP M/U kelly and establish parameters. Up weight 60K, Down weight 58K, Rotating weight 58K, Wash down and tag top of 9-5/8" stub at 2,154', dress top of stub to 2,155'. Dress with 60 rpm at 4500 ft/Ibs of torque, 3 - 5K WOM, 4 bpm with 170 psi. P/U off of stub after dressing and slide back over without problems. DECOMP Circulate 30 bbl hi-vis sweep around 4.5 bpm with 190 psi. Sweep brought up metal cuttings and scale. DECOMP Stand back kelly and POH with BHA #7, standing back 3-1/2" DP in derrick. DECOMP Stand back drill collars and break down BHA #7, Dress-Off assemby DECOMP Break out and L/D dress off assembly. Empty boot basket. Recovered 2-1/2 gallons of metal cuttings. Good wear marks on dress off mill. DECOMP M Halco 13-3/8" RTTS and RIH to 2 145' DECOMP M/U circulating head and set Halco 13-3/8" Packer at 2,145'. DECOMP Release RTTS and relax elements, break out circulating head. POOH with 13-3/8" RTTS standing back 3-1/2" DP in derrick. Laid down RTTS. DECOMP Clear and clean rig floor. TIEB2 Rig up 9-5/8" handling equipment. TIEB2 PJSM -Reviewed 9-5/8" casing handling and running procedure with all crew. TIEB2 PUMU 9-5/8" tie-back bottomhole jewelry as follows: 9-5/8" Bowen casing patch, 15' 9-5/8" 40#, L-80 BTC pup, 9' 9-5/8" 40#, L-80 BTC pup, Baker ECP, 10' 9-5/8" 40#, L-80 BTC pup, 5' 9-5/8" 40#, L-80 BTC pup, Halco 9-5/8" 40# ES Cementer and 10' 9-5/8" 40#, L-80 BTC pup. Baker-Lok'd and torqued up all BTC connections below ES cementer to the mark. Torqued up 9-5/8" BTC connection above ES cementer to mark. TIEB2 RIH with 9-5/8" 40#, L-80 Hydril 563 casing. Torque turned all 40# Hydril connections to 13,000 ft-Ibs. target torque and single Start: 10/14/2008 Rig Release: 11 /1 /2008 Rig Number: Pnntetl: 11252008 11:UU:;S;1 AM • • BP EXPLORATION Page 8 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABORS 4ES Rig Number: Date ,From - To Hours i Task Code NPT Phase Description of Operations 10/27/2008 11:30 - 16:30 5.00 CASE P 16:30 - 18:00 1.50 CASE P 18:00 - 18:30 0.50 CASE P 18:30 - 20:00 1.50 CASE P 20:00 - 21:00 1.00 CASE P 21:00 - 00:00 I 3.00 I CEMT I P 10/28/2008 100:00 - 01:00 I 1.001 CEMT I P 01:00 - 03:00 ~ 2.00 ~ BOPSUF~ P 03:00 - 04:30 ~ 1.50 ~ BOPSUq P 04:30 - 06:00 1.50 06:00 - 06:30 I 0.50 TIEB2 47# connection to 15,800 ft-Ibs. target torque. P/U Wt. = 90K; S/O Wt. = 90K. Tag 9-5/8" casing stub at 2155'. Engage stub with Bowen casin atch. Set 15K downweight on stub. P/U to 10K overpull. Set 30K downweight on stub to fully engage grapple. Pull tested to 250K. Slacked off to 100K and set in slips to makeup Halco cementing head. TIEB2 Rig down 9-5/8" handling tools and clear floor. TIEB2 Service rig and check alarms. TIEB2 Pressure u on the ECP to 1 000 si and hold for 15 minutes. Walk pressure up in 200 psi increments and hold at each pressure increase. ECP sheared open at 1,600 psi and bled to 1,400 si. Bleed to 0 si and pressure back up to 1,600 si to fill ECP. Pressure up to 2,000 psi for 30 minutes to test casing, cementer. Good shear. TIE62 Circulate heated seawater till returns are 80 degrees. 5-1/2 bpm with 170 psi. TIE62 Hold PJSM with all personnel involved. Pump 5 bbls of seawater, test lines to 4,500 psi, pump 144 bbls of 15.8 ppg Class G cement w/ Gas-Blok at 5-1/2" bpm with 350 psi, Drop plug, visual on flag when plug pumped out of head. Displace with seawater at 6 bpm with 700 psi, slow to 1.5 bpm at 120 bbls of displacement and divert to open top tank. Pinch in return valve and maintain 500-600 psi back pressure to attempt to squeeze cement into 13-3/8" leak. Bumped plug at 161 bbls pumped. Pressured up to 2,080 psi and shifted ES Cementer closed. Bled off pressure checked floats. Floats holding. CIP at 23:30 hours. Cement returns to surface, appx 8 bbls. TIEB2 Blow down lines, R/D circulating lines. Drain BOP stack, Remove fluid fom 9-5/8 joint to be cut. TIEB2 N/D BOP stack and lift up to allow slips to be set. Clean out bowl. TIEB2 Install McEvoy lower bowl slips and set into place with 100K of overpull to energize slips. R/U Wachs cutter and make cut on 9-5/8" casing. Remove cut joint of casing from rotary table and Stand back BOP stack P I (TIEB2 P 06:30 - 07:00 0.50 BOPSU P 07:00 - 11:00 4.00 BOPSU P 11:00 - 14:30 3.50 CEMT P 14:30 - 15:00 0.50 CEMT P 15:00 - 18:00 3.00 CEMT P and install new Mc SSH tubing spool and Pack-off. TIEB2 Crew change. Pre-tour meeting, service rig, check PVT's and daily derrick inspection. TIEB2 Pressure test wellhead packoff to 3800-psi for 30-minutes. TIEB2 Nipple BOPE and test breaks to 250-psi Lo/3500- si Hi. Drain stack, pull test plug and set wear ring. TIE62 ,BHA = 8-1/2" bit, bit sub w/ float, XO, double pin XO, (2) boot baskets, 9-5/8" casing scraper, bit sub, XO, (6) 6-1/4" DC's, XO. Total BHA length = 205.74' TIEB2 RIH with 3-1/2" Dp from derrick from 205'. Tagged cement at 2 066'. TIE62 P/U kelly and establish parameters. Up weight 55k, Down weight 55k, Rotating weight 55k, 60 rpm with 2,000 fUlbs of torque, 5 bpm with 260 psi. Drill cement with 3k WOB, drill cement to plug at 2,100'. Drill plug and ES cementer to 2,110' Printetl: 11/25/2008 11:00:33 AM • BP EXPLORATION Page 9 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 10/28/2008 18:00 - 18:30 0.50 CEMT P TIEB2 Sevice rig, check PVT alarms, Inspect derrick 18:30 - 22:00 3.50 CEMT P TIEB2 Control dril from 2,110'to 2,215' Up Wt. 57k, Dn Wt. 57k Rot. Wt 57k, 70 RPM with 2,000 fUlbs of torque, WOB 5k, 4.6 BPM at 220 psi 22:00 - 22:30 0.50 CEMT P TIEB2 Circulate bottoms up at 100 SPM with 390 psi 22:30 - 23:00 0.50 CEMT P TIEB2 D Drill from 2,215' to 2,218' 23:00 - 00:00 1.00 CEMT P TIEB2 Pump 30 BBL Hi-vis sweep. Chunks of rubber back over shaker. 10/29/2008 00:00 - 00:30 0.50 CEMT P TIEB2 Continue circulating bottoms up 00:30 - 02:00 1.50 CEMT P T1EB2 POOH standing back 3 1/2" DP in derrick. 02:00 - 03:00 1.00 CEMT P TIEB2 Lay down BHA #8 (Recovered approx. 3 gallons of cement, brass, and aluminum.) 03:00 - 03:30 0.50 CEMT P TIE62 Clear and clean rig floor. 03:30 - 04:00 0.50 CEMT P TIEB2 Pressure test 9 5/8" casing to 3500 psi for 30 charted minutes. 04:00 - 06:00 2.00 CEMT P TIE62 Pick u BHA #9 7 7/8" reverse circ. 'unk basket, 2) 7" boot baskets, bit sub, x-o, 6) 6 1/4" DC's, x-o. 06:00 - 06:30 0.50 CEMT P TIE62 Service rig and set alarms. 06:30 - 07:00 0.50 CEMT P TIEB2 RIH to 2218' on 3-1/2" DP from derrick. 07:00 - 09:00 2.00 CEMT P TIEB2 M/U kell and wash from 2,218' to 2,229', Work RCJB. 09:00 - 10:30 1.50 CEMT P TIE62 Stand back kelly and POOH standing back 3-1/2" DP. 10:30 - 12:00 1.50 CEMT P TIEB2 L/D RCJB BHA. Empty RCJB, Retrieved ES Cementer setting rin . 12:00 - 12:30 0.50 CASE P TIEB2 Clear and clean rig floor. 12:30 - 13:00 0.50 CASE P TIEB2 M/U HES 9-5/8" RBP runnin tool and RIH on 3-1/2" DP from derrick. 13:00 - 14:00 1.00 CASE P TIE62 Perform stripping drill with crew. Stabbed floor valve and dart valve, closed annular preventer and put 150 psi on the backside. Set working pressure of additional 150 psi and stripped in the hole maintaining working pressure. Bled off pressure and POH to remove valves from string. Discussed drill with crew. 14:00 - 14:30 0.50 CASE P TIEB2 RIH with HES running tool on DP from derrick. to 2,229' 14:30 - 17:00 2.50 CASE P TIE62 M/U circulating head and reverse circulate from 2,229' to 2,260'. Enga a HES 9-5/8" RBP and release. Wait 10 minutes for rubbers to relax. Run downhole past packer setting depth to ensure RBP released. 17:00 - 17:30 0.50 CASE P TIE62 POOH with HES 9-5/8" RBP standing back 3-1/2" DP in derrick. 17:30 - 18:00 0.50 CASE P TIEB2 L/D 6 1/4" DC's and BHA 18:00 - 18:30 0.50 CASE P TIEB2 Service rig, test PVT, Derrick inspection. 18:30 - 19:30 1.00 CASE P TIEB2 Clear and clean rig floor. 19:30 - 22:30 3.00 CASE P TIE62 P/U 2 7/8" handling tools and M/U BHA # 10.3 3/4" Drag tooth bit, bit sub, 32) jts. 2 7/8" Pac DP, X-O, dbl pin sub, 2) boot junk subs, bit sub, X-O, Pump out sub. 22:30 - 00:00 1.50 CASE P TIE62 RIH with 3 1/2" DP from derrick. 10/30/2008 00:00 - 01:00 1.00 CASE P TIEB2 RIH with BHA #10, 2-7/8" Clean Out Assembly on 3 1/2" DP from derrick. 01:00 - 02:00 1.00 CASE P TIE62 Perform stripping drill with crew. Stabbed floor valve and dart valve, closed annular preventer and put 200 psi on the backside. Set working pressure of additional 100 psi and stripped in the hole maintaining working pressure. Bled off pressure and POH to remove valves from string. Discussed drill with crew. Printetl: 11/25/2008 11:UU:;1;1 AM • BP EXPLORATION Page 10 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 4ES Date ~ From - To Hours ~ Task ~ Code i NPT ~i I 10/30/2008 02:00 - 04:00 2.00 CASE I P 04:00 - 18:30 14.501 DRILL P 18:30 - 20:30 20:30 - 21:00 21:00 - 00:00 10/31 /2008 00:00 - 01:00 01:00 - 02:30 02:30 - 07:00 07:00 - 09:00 09:00 - 11:00 11:00 - 13:00 2.00 DRILL P 0.50 DRILL P 3.00 DRILL P 1.00 DRILL P 1.50 DRILL P 4.50 DRILL P 2.001 DRILL I P 2.00 DRILL P 2.00 BUNCO 13:00 - 00:00 I 11.00 11/1/2008 100:00 - 02:00 I 2.00 02:00 - 02:30 I 0.50 02:30 - 03:00 0.50 03:00 - 06:30 3.50 06:30 - 09:00 I 2.50 Spud Date: 11 /21 /1985 Start: 10/14/2008 End: I Rig Release: 11/1/2008 Rig Number: Phase I Description of Operations TIEB2 Cont. RIH with 3 1/2" DP from derrick, tagged ~ 9768'. L/D 4) jts 3 1/2" DP and P/U stand from derrick. TIEB2 P/U kelly and drill cement, landing collar, and float collar. Drill cement and float equi .from 9768' to 9,946', continue to drill down to to of sand lu at 9,956'. P/U WT 146 k - S/O Wt 123 k-RotWt135k-W0B3k -Tq.2400ft1bs-72SPM-1090 PSI. Had problems drilling through rubber plug and float equipment. Varied WOB from 2-10k, rotary fron 30-100 rpm, tried pump pressure from 200 psi to 1,500 psi. Made very little difference in BOP. Swaped over to clean seawater while drilling TIE62 CBU ~ 95 SPM 5.6 BPM with 1750 PSI. Losses ~ 36 BPH. TIEB2 Monitor well static losses at 27 BPH TIEB2 POOH la in down 3 1/2" DP 1x1 to i e shed. Drop rod and press. up to 2200 psi to open pump out sub. Cont. POOH with 3 1/2" DP 1x1 to pipe shed. Monitor well C«? liner top. maintain constant holetill with seawater. TIEB2 Service rig, Test PVT alarms, Derrick inspection TIEB2 Cut and slip drilling line 84', maintained hole fill with seawater. TIEB2 POOH UD 3 1/2" DP 1x1 to pipe shed, maintain constant TIEB2 R/U 2-7/8" handling equipment and POOH laying down 2-7/8" clean out assembly. Drag bit was 1/8" out of gauge and missing cutters. 1/2 gallon of pot metal and cement in boot baskets. TIEB2 Clear and clean rig floor, pull wear bushing. RUNCMP R/U handling equipment for 4-1/2" chrome completion. R/U Torque Turn equipment. Co-Man, Baker Packer Rep, and Driller checked to make sure jewelry in right order and verified amount of pipe in pipeshed. Hold PJSM with all personnel involved. RUNCMP Run 4-1/2", 12.6#, 13CR80, Vam Top tubing, Torque Turn each connection, use Jet Lube Seal Guard pipe dope. Average make up torque =4440 ft Ibs RUNCMP Cont. to Run 4-1/2", 12.6#, 13CR80, Vam Top tubing, Torque Turn each connection, use Jet Lube Seal Guard pipe dope. Average make up torque =4440 ft Ibs. Ran 209 Jts of 4-1/2", 12.6#, 13CR80, Vam Top tubing, 3) X-nipples, 1) XN-nipple, 1) Baker 9 5/8" x 4 1/2" Chrome S-3 packer, 2) GLM's. RUNCMP Tagged top of .liner C~? 8995' run in to NO-GO ~ 9023'.. Pull 3 jts and pick up 24' of space out pups and 1) jt Tub. M/U hanger and land. Landed 3' from NO-GO ~ 9020' RUNCMP RILDS and torque to 450 ft Ibs. Back out Landing jt. RUNCMP R/U to reverse circ. 120 bbls of 120 Degree sea water and 425 bbls of corrosion inhibited sea water ~ 3 BPM with 110 psi. RUNCMP Drop rod and ball. Pressure up on tubing and set packer, ressure up to 3,500 psi and test tubing for 30 minutes on the rhart_ Gaod test Bleed tubina pressure to 1.500 psi and shut chart. Good test. O en up and bleed down tubing, DCR valve sheared at 900 si. Pump through DCR valve both ways to ensure it is open. 09:00 - 10:30 1.50 BUNCO RUNCMP Set TWC and test from below to 1000 psi and from above to Printed: 11/25/2008 11:00:33 AM BP EXPLORATION Page 11 of 11 Operations Summary Report Legal Well Name: D-29 Common Well Name: D-29 Spud Date: 11/21/1985 Event Name: WORKOVER Start: 10/14/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 11/1/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To Hours Task I Code ~ NPT ~ Phase Description of Operations 11/1/2008 09:00 - 10:30 1.50 BUNCO RUNCMP 3500 si for 10 charted min each. R/D lines and blow down 10:30 - 15:00 15:00 - 16:00 4.50 1.00 BOPSU WHSUR P P RUNCMP RUNCMP N/D BOP's and set back. N/U adapter and tree test each to 5000 psi for 15 min. R/U DSM lubricator and test to 500 si, ull TWC and UD same. 16:00 - 19:00 3.00 BUNCO RUNCMP R/U Little Red and test lines to 3500 psi, reverse circ. 150 bbls of 80 deg. diesel ~ 2 BPM - 600 psi. U-Tube for 1 hour. 19:00 - 20:00 1.00 WHSUR P RUNCMP Cameron set BPV and test from below to 1000 psi for 10 charted min. 20:00 - 22:00 2.00 WHSUR P RUNCMP Blow down all lines and rig down same. Secure tree and cellar. Rig released ~ 2200 hrs on 11-1-08 Printed: 11/25/2008 11:00:33 AM ELLHEAD= MCEVOY CTUATOE2= AXELSON 3aELEV = 70.8' =. E1EV = 44.39' DP - 3700' ax Angle = 37 @ 6100' DRLG DRAFT atum MD = 9796' 3tum TVD = 8800' SS 9-5/8" CSG PATCH, 40#, L-80, ID = 8.681" 2156' 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 26$0' Minimum ID = 3.725" @ 8972' 4-1 /2" HES XN NIPPLE TOP OF 4-112" SCAB LNR ~ 8990' F-- 4-112" TBG, 12.6#, 13CR, ID = 3.958" 9021' TOP OF 7" LNR 9100' 9-5/8" CSG, 47#, L-80, ID = 8.681" ~ 9389' 4-1/2" SCAB LNR, 12.6#, 13CR, ID = 3.958" 9946' PERFORATION SUMMARY REF LOG: GEARHART-BHCS ON 12/06!85 ANGLE AT TOP PERF: 26 @ 9903' Note: Refer to Production DB for historical pert data SIZE. SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 9903 - 9915 S 10/09/89 3-1/8" 4 9926 - 9936 S 10/09/89 3-3/8" 4 9960 - 10111 S 10/09/89 3-3/8" 4 9963 - 9978 O 10/14/89 3-3/8" 6 9980 - 10000 O 01!28196 3-3/8" 6 9982 - 10005 O 07/15/96 2-7/8" 4 9984 - 10005 O 10/25!89 D -~ ~ SAFETY NOTES: 2099' 9-518" HES ES CEMENTER, ID = 8.835" 2112' 4-112" HES X NIP, ID = 3.813" GAS LIFT MANDRELS iT MD TVD DEV TYPE VLV LATCH PORT DAT 2 3519 3519 4 MMG DOME RK 16 11/07 1 6397 5994 37 MMG SO RK 22 11/071 8863' ~ 4-1 /2" HES X NIP, ID = 3.813" 8885' 9-5/8" x 4-1/2" BKR CR S-3 PKR, ID = 3.85" 8909' 4-1/2" HES X NIP, ID = 3.813" $972' 4-1 /2" HES XN NIP, ID = 3.725" 8990' 9-518" x 4-1/2" BKR ZXP-C2 PKR, ID = 6.31" 9008' 9-518" x 4-1 /2" BKR LNR HGR, ID = 6.35" 9018' 7" x 4-1 /2" XO, ID = 3.813" PBTD 10139' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10165' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff 11!10185 ORIGINAL COMPLETION WELL: D-29 11/01(08 N4ES RWO PERMIT No: 1852530 11/10/08 GJF/SV GLV C/O (11/07!08) API No: 50-029-21470-00 SEC 23, T11 N, R13E, 1985' FSL & 1067' FWL 12/08/08 Schtumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Bette Well .Inh 8 1 .,.. ne ..~:., NO. 4995 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 n...,. R-03A 4994 INJECTION PROFILE (REVISED) 10/08/08 1 1 13-23A 4994 INJECTION PROFILE 10/2i/08 1 1 01-26A 4994 SCMT 11/13/08 1 1 D-29 4994 USIT 10/19/08 1 1 15-02B 4994 MEM PROD PROFILE - 11/25/08 1 1 H-O5A 4994 MEM PROD & INJ PROFILE 11/20/08 1 1 E-32A 4994 SCMT - ( 11/04/08 1 1 12-17 4994 PRODUCTION LOG - O L~ 11/04/08 1 1 P2-41 4994 PRODUCTION LOG - 11/p7/Og 1 1 1••29/M-25 4994 PRODUCTION LOG (p _ 11/04/08 1 1 NIPC-05A 4994 MEM LDL ~ 11/15/08 1 1 L-114A 4994 _ USIT ~- r. (( S 11/03/08 1 1 A-07 4994 PRODUCTION PROFILE ~- - ( ~} 11/27/08 1 1 07-18 4994 INJECTION PROFILE ~ _ - 12/02/08 1 1 15-126 4994 MEM PROD PROFILE ~ ...- - ~ 11/27/08 1 1 4-40/P-43 4994 MEM LDL I~j - - '~' •C:p 11/26/08 1 1 N-146 4994 MCNL -(~'~~ [ ` 09/20/08 1 1 01-21A 4994 MCNL -- pg/2g/Og 1 i E-29A 4994 MCNL 09/01/08 1 1 PI FARF ACKNAWI ~nnc ec r•eior ev err_~ u~~r_ nw~n ocr~ ~or.uw~i. i...~ .+...... ~..... BP Exploration (Alaska) Ina Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 :~~ '_ ~~ ,;~g Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 8 8 ATTN: Beth Received by: • ~~ 11/04/08 Schiumberg~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # N0.4952 Company: State of Alaska "/ ~ i ~~y~r ~ ~ i.~ ~ ~~~ ~ ~rt Alaska Oil & Gas Cons Comm (~' Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 I nn 11u¢r•rin4inn - dale QI !`..1... nn D-29 12103692 USIT ( 10/19/08 _ - - 1 - 1 13-16 12103694 INJECTION PROFILE (REVISED) / 10/20/08 1 1 13-19 12103695 INJECTION PROFILE I ~I 10/21/08 1 1 03-04 12031526 INJECTION PROFILE 10/22/08 1 1 J-OSA 12031514 CBL p~_ 'ax I 09/20/08 1 1 06-17 11970850 PRODUCTION LOG ~ ~ (p~, 10/30/08 1 1 01-33 11999052 RST - ~j 10/10/08 1 1 1-45/0-26 12096920 LDL '"~-. 10/10/OS 1 1 3-05/0-29 12083416 MEM LDL ~ 10/24/08 1 i L-116 11999055 USIT .- t ~• / • tj 10/31/08 1 1 rrr.vr r•v,•,•v w~~.vva. ~•w~ r, Gl• Jlgl\II\tl MIrV 1'IGI Vr11711Y1A VIYC ~.VrT CMVrI 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~ ? jl ` s rs ~ _ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99 03-283 ATTN: Beth Received by: -----~ • • GPB D-29 Well Control Eve • Page 1 of 1 Regg, James B (DOA) From: Sent: To: Cc: Hefley, G Mike [HefleyMG@BP.com] Wednesday, October 22, 2008 10:41 AM Regg, James B (DOA) lei ~i3 DOA AOGCC Prudhoe Bay; aogcc_prudhoe_bay@admin.state.ak.us; Willingham, James M; Rossberg, R Steven; Reem, David C; Baca, Hank; Aubert, Winton; Bounds, Steven E; Haberthur, Donald G.; Burson, Billy (FAIRWEATHER); West, Howard J Subject: GPB D-29 Well Control Event Mr. Regg, Well No.: D-29 ~ . ~~, ~; ~ %' " API No.: 50-029-21470-00 ~ ~~~~~ ~ ~~ , _ ~` t-~~~ PTD: 1852530 ./ Workover Fluid: 8.5-ppg seawater On 10/21/2008 at 18:30 directly after a crew change the well began flowing gas cut seawater. The pit gain alarm sounded and a 3.0-Bbl. gain was noted in the pits. Immediate action was taken to close the well in. Specifically, the annular preventer was closed and the drill pipe was already shut-in with a TIW floor valve due to crew change activities. The rig charge pump was on and pumping fluid across the top of the flow nipple with losses to the well at 4.5 barrels per hour during crew change. After the well was closed in, a total of a 12.0-Bbl. gain was measured in the rig pits. The well was shut-in within 5 minutes after the pit gain alarm sounded. Shut-in pressures were as follows: SICP = 80-psi; SIDPP = 0-psi; OAP = 40-psi. At the time the well began flowing we had 3002' of 3-1/2" drill pipe, fishing BHA and original completion packer with tailpipe in well. Immediate action was taken to begin circulating the well with gas cut returns being taken through the super choke to the gas buster and rig pits. The well was circulated with 8.5-ppg seawater until no gas was noted in returns and at that time fluid losses to the well were 24 barrels per hour. At that time a decision was made to perform a bullhead kill on the well with 1.5 times wetlbore volume of 8.5-ppg seawater. A total of 1000-Bbls. of seawater was bullheaded into the well at 6 to 7.5 barrels per minute at 2500-psi. Bullheading was halted at 1000-bbls., pressure bled off and the well was monitored for one hour at which time the inner annulus and dritlpipe were on a vacuum. The inner annulus was filled with seawater and a fluid loss rate of 24 barrels per hour was measured. Normal activities were resumed to finish pulling the string from the well. Our plan forward is to pressure test the annular preventer per AOGCC regulation and BP requirements to 250-psi Lo/3500-psi Hi before continuing workover activities. The annular preventer will be tested with a 3-1/2" O.D. test joint which the smallest O.D. tubular goods we will be using until the next required weekly BOPE test is due which is on 10/25/2008. We have determined that this was most likely not a gas influx from the reservoir, but was flow resulting from trapped gas under the packer that was never released from below the packer until the packer sealing elements were worn enough to release the gas past the packer and allow it to migrate to the surface. Regards, Mike Hefley ADW Wellsite Leader North Slope Nabors 4ES Rig hefleymg@bp.com 659-4608 10/22/2008 C: `gip ~ .y ~ .,.~ ,.., ~°a:~ ~ ~- ~-_ ~~, LJ,{,t{] ~ ~ { ~~ L ALASSA OIL AIQD GA5 C011T5ERQATIOI~T COMI-II5SIOrT David Reem Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 53 `~ 5, 2- ~~' SAP ~ 200 Re: Prudhoe Bay Wield, Prudhoe Bay Oil Pool, PBU D-29 Sundry Number: 308-344 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of September, 2008 Encl. STATE OF ALASKA • L - • ~~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~~' APPLICATION FOR SUNDRY APPROV~-L 20 AAC 25.280 J~ 9-0?5~ cp . ~~ ~ 14,, ~~ ~~ 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ®Alter Casing , ®Repair Well- ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ®Pull Tubing . ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development. ^ Exploratory 185"253 - 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21470-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:. property line where ownership or landownership changes: PBU D-29 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028285 - 70.84 - Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10170 - 9207 - 10139 9179 None None in n t ize M TVD B Coll r rl n "x 1 1 ' Surfa 1 3/8" 8' 4 30 2 7 In rm di to Pr / " 7 47 Liner 1 5' 7" 1'- 1 1 2 4' - 7 40 1 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9963' - 10005' 9021' -9059' 4-12", 12.6# L-80 9166' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker Packer Packers and SSSV MD (ft): 9045' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: October 10, 2008 ®Oil - ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that. the foregoing is true and correct to the best of my knowledge. Contact Hank Baca, 564-5444 Printed Na avid Reem Title Engineering Team Leader / Prepared By Name/Number: Signature Phone 564-5743 Date x/22 a~ Sondra Stewman, 564-4750 Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ~OP Test ^ Mechanical Integrity Test ^ Location Clearance ~~ ~' ~'~.~'-~ Other: "~~ ~ -i . ~U~ -t~C:-j~ G i ' \ Subsequent Form Required: I.~~~r APPROVED BY ~ /2 S ~ ' S A roved B COMMISSIONER THE COMMISSION Date Form 10-403 Revised'06/2006 _. _~ : t ,~ ~ IBF~ sE~ ~ ~ 2ooa Submit In Duplicate by c,~,y • D-29 Rig Workover (Repair surface casing leak/scab over upper perfs) Scope of Work: Pull 4.5" L-80 completion, cut and pull 9-5/8' casing, tie-back w/ new 9 s/8" casing (cemented to surface), replace 9 s/a" hanger and primary pack-off. Run & cement 4.5" scab liner to cover upper perfs. Run 4.5" 13 Cr-80 completion. Engineer: Hank Baca MASP: 3300 psi Well Type: Producer Estimated Start Date: October 10"', 2008 S 1 Pull PX lu ~ 9020', drift tubin for 4.5" 'et cutter C 2 Sot sand lu from PBTD to 9950' Correlate to ELMD tubin tail @ 9158' S 2 Set lu in XN ni le C«~ 9133'. Test lu to 1000 si for 10 minutes to verif barrier E 3 Jet cut tubin at 9030' if lu holds. F 4 Circulate well with seawater and diesel thru the cut. CMIT TxIA to 1000 psi to verify barriers intact W 5 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breaka e. PPPOT-T & IC. W 6 Set a BPV in the tubin han er. O 7 Remove the wellhouse & flow line. Level the pad as needed for the rig. Line the cellar in preparation for the rig taking fluid returns from the conductor flutes to the cellar liner secondar containment is the cellar liner . Proposed Procedure 1. MIRU. ND tree. NU and test BOPE to 250 psi low/ 3500 psi high. Circulate out freeze protection fluid and circulate well to clean seawater through the cut. 2. Pull and LD tubing string to the cut. 3. RU wireline and run USIT from 4000' to surface. 4. Run 9-5/g" RBP and set 100' below TOC determined from USIT. PT RBP to 1000 psi to prove plug is set. Dump ~50' of sand on RBP. 5. Mechanically cut 9 5/8" casing in 1St full joint above top of cement. Pull casing through stack. Dress- off 9-5/$" stub in preparation of casing overshot. Note: VBR's will not be changed to 9 5/8" pipe rams as the well has two tested barriers (TTP/Packer and RBP) to the reservoir. 6. Run back in with new 9-5/$", 47#, L-80 casing and land on new emergency slips with new primary pack-off. PT 9 5/8' pack-off to 3500 psi. Cement new 9 5/a" casing to surface 7. Cleanout above 9-5/S" RBP. Pull 9-g/8" RBP. 8. Fish/mill up remaining 4.5" tubing & packer. 9. Run 4-~/z" 13Cr-80 liner from ~ 9000-9950' & cement 10. Run 4-~/z" 13Cr-80 completion & tie into 4.5" liner 11. Displace the IA to packer fluid and set the packer. 12. Test tubing and IA to 3500 psi. Freeze protect to 2,200' MD. 13. Set TWC. ND BOPE. NU and test tree. Pull TWC and set BPV. RDMO. = 4" CIW WELLHEAD = MCEVOY ACTUATOR= AXELSON KB. ELEV = 70.8' BF. ELEV = 44.39' KOP = 3700' Max Angle = 37 @ 6100' Datum MD = 9796' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" __ D ~2 9 LIMITS: MAX LAP*= 25 0 PSIM, MAX OAP = N 00 PSI (11/20/03 WAIVER)*** 2047' 4-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT MANDRELS Minimum ID = 3.725" @ 9133' 4-1 /2" OTIS XN NIPPLE ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 2987 2916 0 OTIS-LBD DOME RM 16 07/01/05 6 5075 4864 34 OTIS-LBD SO RM 20 07/01/05 5 6499 6005 37 OTIS-LBD DMY RA 0 4 7186 6564 33 OTIS-LBD DMY RA 0 3 7778 7067 32 OTIS-LBD DMY RA 0 2 8416 7600 33 OTIS-LBD DMY RA 0 1 8738 7872 32 CAMCO DMY RA 0 11/22/02 4-1/2" OTIS XA SLIDING SLV, ID = 3.813" TBG SEAL ASSY 9-5/8" X 4-1/2" BKR PKR, ID = 4.0" TOP OF 7" LNR I~ 9100' ~ 4-1/2" TBG, 12.6#, L-80, .0152 bpf,ID = 3.958" ~ 9-5/8" CSG, 47#, L-80, ID = 8.681" I 9389' PERFORATION SUMMARY REF LOG: GEARHART-BHCS ON 12/06/85 ANGLE AT TOP PERF: 26 @ 9903' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 9903 - 9915 S 10/09/89 3-1/8" 4 9926 - 9936 S 10/09/89 3-3/8" 4 9960 - 10111 S 10/09/89 3-3/8" 4 9963 - 9978 O 10/14/89 3-3/8" 6 9980 - 10000 O 01 /28/96 3-3/8" 6 9982 - 10005 O 07!15/96 2-7/8" 4 9984 - 10005 O 10/25/89 PBTD 10139' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10165' 9101' ~4-1/2" OTIS X NIP, ID = 3.813" 9133' 4-1/2" OTIS XN NIP, ID = 3.725" 9166' 4-1/2" TBG TAIL, ID = 3.958" 9158' ELMD TT LOGGED 10/14/89 DATE REV BY COMMENTS DATE REV BY COMMENTS 11/10/85 ORIGINAL COMPLETION 07/02/05 DTR/TLH GLV GO 05/19/01 RNITP CORRECTIONS 11/22/02 DTR(fP GLV GO 07/11/03 CMO/TLP KB ELEVATION CORRECTION 11/28/03 KDGPAG WANER SAFETY NOTE 10/17/04 DAV/TLH GLV GO PRUDHOE BAY UNff WELL: D-29 PERMff No: 1852530 API No: 50-029-21470-00 SEC 23, T11N, R13E, 1985' FSL & 1067' FWL BP Exploration (Alaska) TREE = 4" CM/ WELLHEAD = MCEVOY ACTUA~"OR = _ AXELSON KB. ELEV = 70.8' BF. ELEV = 44.39' KOP = 3700' Max Angle = 37 @ 6100' Datum MD = 9796' Datum TV D = 8800' SS ~ D-29 ~~: PROPOSED 9.625" Unique Overshot 13-3/8" CSG, 72#, L-80, ID = 12.347" 2680' 4.5" X nip, 3.813" I 4.5" X nip, 3.813" ID 4.5" 12.6# 13Cr-80 tubing tied into liner top TOP OF 7" LNR 9100' 9-5/8" CSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY REF LOG: GEARHART-BRCS ON 12/06/85 ANGLE AT TOP PERF: 26 @ 9903' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 9903 - 9915 S 10/09/89 3-1/8" 4 9926 - 9936 S 10/09/89 3-3/8" 4 9960 - 10111 S 10/09/89 3-3/8" 4 9963 - 9978 C 10/14/89 3-3/8" 6 9980 - 10000 C 01/28/96 3-3/8" 6 9982 - 10005 C 07/15/96 2-7/8" 4 9984 - 10005 C 10/25/89 PBTD 10139' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 10165' -2100` 4.5" X nip, 3.813" ID 9.625" 47# L-80 cemented to surface GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4.5" x 9.625" Baker S-3 Chrome Packer - 4.5" XN nip, 3.725" ID -4.5" x 9.625" liner hanger & packer 4.5" 12.6# 13Cr-80 cemented liner @ -9950` DATE REV BY COMMENTS DATE REV BY COMMENTS 11/10/85 OWGINAL COMPLETION 07/02/05 DTR/TLH GLV GO 08/29/05 EZL/TLH WAIVER SFTY NOTE DELETED 09/30/05 DAV/TLH GLV GO 10/06/05 KDC/TLH XXN TTP PULLED / XN TTP SET 07/18/06 CJN/PJC 4-1/2" PX TTP SET PRUDHOE BAY UNIT WELL: D-29 PERMIT No: 1852530 API No: 50-029-21470-00 SEC 23, T11 N, R13E, 1985' FSL & 1067' FWL BP Exploration (Alaska) 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: ft/J¿ fh-J/ð,6 . STATE OF ALASKA _ ALA Oil AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS o o o RECEIVED SEP 1 9 2006 P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development R Stratigraphic Stimulate 0 Waiver 0 Time Extension ~nchorage Re-enter Suspended Well 0 5. Permit to Drill Number: 185-2530 3. Address: Exploratory Service 6. API Number: 50-029-21470-00-00 9. Well Name and Number: 70.84 KB PBU D-29 ADLO-028285 11. Present Well Condition Summary: 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool 8. Property Designation: Total Depth measured 10171 feet true vertical 9208.02 feet Effective Depth measured 10139 feet true vertical 9179.28 feet Casing Length Size MD Surface 2651' 13-3/8" 72# L-80 29' - 2680' Production 9361' 9-5/8" 47# L-80 28' - 9389' Liner 1065' 7" 29# L -80 9100' - 10165' Tubing 9136' 4-1/2" 12.6# L-80 30' 9166' Plugs (measured) 9101' Junk (measured) None TVD 29' - 2680' 28' - 8508' 8254' - 9203' 30' - 8311' Burst 4930 6870 8160 8430 Collapse 2670 4760 7020 7500 Perforation depth: Measured depth: 9903 - 9936' True Vertical depth: 8967.3 - 8997' !,I"'\\'\'IÀ.U:::[v ~ED 2· 6 200ß \-.:i~{r\D't!~~tii....... \oJ ~~- - - Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 28' - 9166' Packers and SSSV (type and measured depth) 4-1/2" Baker PRM Packer o o o 9045 o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 30476 9 0 o 0 0 15. Well Class after Droposed work: Exploratory Development R 16. Well Status after proposed work: Oil R Gas WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Oil-Bbl 668 o Tubing pressure 1528 o Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Service x Contact Gary Preble WINJ WDSPl Title Data Engineer Signature Phone 564-4944 Date 9/13/2006 c;EP ? r 700~ " ," ¡) ~ II Submit Original Only . . D-29 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY *** WELL S/I ON ARRIVAL *** DRIFT TUBING TO TTP @ 9060' SLM W/ 3.80 G-RING, TIGHT GOING THROUGH SLIDING SLEEVE @ 8990' SLM, RAN 1.5" PUMP BAILER, RECOVERED APROX. 1 GAL. OF PLASTIC COATED TUBING FROM TOP OF TTP, RAN 41/2" X-EQ PRONG, SAW 25# TUBING PRESSURE INCREASE AND GOOD MARKS ON EQ PRONG, 7/9/2006 *** CONTINUED ON 07/10/06*** *** CONTINUED FROM 07/09/06 *** SET 41/2" XX PLUG (8- 3/16" PORTS & 18" FILL EXT.) @ 8993' SLM, PRESSURE TEST. 7/10/2006 *** CONTINUED ON 07/11/06 *** *** CONTINUED FROM 07/10/06 *** ATTEMPTED TO GET 41/2" XX TBG TAIL PLUG TO TEST (SET @ 9020'MD 07-10-06). . RIH TO PULL TBG TAIL PLUG, BLOWN UP HOLE WHILE PULLING PLUG BODY. DROPPED KINLEY CUTTER AND RETRIEVED ALL BUT -77' OF .125" WIRE. RIH W/3.61" LIB TO TAG FISH, 7/1 *** CONTINUED ON 07-13-06 WSR.*** *** CONTINUED FROM 07/11/06 *** RAN IN WITH 3.6 LIB TO 8839' SLM, GOT PICTURE OF RS. RAN IN WITH 2.5 BLIND B. TO 8839' SLM ATTEMPT TO WORK TOOL STRING DOWN NO CHANGE IN DEPTH. RAN IN WITH 21/2 JU, WORKED TOOL STRING UP HOLE 10', SHEARED. RAN IN WITH 2 1/2 JDC, WORKED TOOL STRING UP TO 8608', SHEARED. RUNNING IN WITH 3.6 LIB. 7/12/2006 *** CONTINUED ON 07/13/06 *** *** CONTINUED FROM 07/12/06 *** FISHED OUT APPROX 40 FOOT WIRE LATCH TOOL STRING & BEGIN POOH. *** CONTINUED ON 07/14/06 *** *** CONTINUED FROM 3/06 *** FISHED OUT LOST TOOLSTRING FROM 8977'SLM (LOST 07-11-06). ATTEMPT TO FISH OUT 4-1/2" LOST TT PLUG / COVERED IN FILL. BAILED OUT 10 GALS OF PLASTIC COATING FROM 9061-9068' SLM. *** CONTINUED ON 07/15/06*** 7/14/2006 7/15/2006 *** FROM *** BAILED 1+ GALLONS OF PLASTIC COATING FROM TOP OF PLUG AT 9068'SLM LIB RUN SHOWING WIRE IN HOLE @ 9066' SLM. RAN GRABS TO 9066'SLM AND RECOVERED 2' OF WIRE (3 SEPERATE RUNS). *** CONTINUED ON 07/16/06 *** . . D-29 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY *** CONTINUED FROM *** FISH OUT ANOTHER 4" OF WIRE FROM 9068' ATTEMPT TO BAIL OUT PLUG, NO RETURNS. RAN GR TO 9057'SLM. CURRENTLY POOH W/INCREASED P/UP WIEGHT (25#). *** CONTINUED ON 07/17/06 *** 7/16/2006 *** *** MADE TWO ATTEMPTS TO PULL TT PLUG W/GR. PARTED WIRE AT SURFACE AFTER LATCHING & POOH W/TT PLUG. FISHED OUT 8698' OF WIRE W/LOST TOOLSTRING. SWAP OVER TO .108" WIRE. *** CONTTNUED ON 07-18/06 *** 7/1 *** *** BRUSH TUBING W/ 4.5 BRUSH(post wire parting/fishing job) RAN SHIFTING TOOL TO CHECK SSD POSITION AT 9020'MD (IT IS CLOSED) SET 4.5 PX PLUG W/21 " FILL EXTENSION @ 8992' SLM SET 96" LONG PX PRONG W/1.75" FISH NECK @ 8988' SLM CLOSURE TEST SUCCESFULL 7/18/2006 *** WELL LEFT S/I ON DEP *** Fluids Pumped BBLS I : .. ~~~:~I . STATE OF ALASKA _ ALA Oil AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure o 0 240 o 0 140 15. Well Class after proposed work: Exploratory Development J;?'. 16. Well Status after proposed work: Oil J;?' Gas WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 70.84 KB 8. Property Designation: ADL-028285 11. Present Well Condition Summary: Total Depth measured 10171 true vertical 9208.02 Effective Depth measured 10139 true vertical 9179.28 Casing Conductor Surface Production Liner Length 80 2651 9361 1065 Size 20" x 30" 13-3/8" 72# L-80 9-5/8" 47# L-80 7" 29# L-80 Perforation depth: Measured depth: .:... True Vertical depth: .:... Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o x Contact Sharmaine Vestal Form 10-404 Revised 04/2004 <J~iì5· ,I!/ LUU Plug Perforations 0 Perforate New Pool D Perforate D 4. Current Well Class: Development J;?' Stratigraphic Stimulate D HèY' Waiver D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: '---':f-' Exploratory Service 6. API Number: 50-029-21470-00-00 9. Well Name and Number: 0-29 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool feet feet Plugs (measured) Junk (measured) 9101 None feet feet MD 30 - 110 29 - 2680 28 - 9389 9100 - 10165 TVD Burst Collapse 30 - 110 29 - 2679.9 4930 2670 28 - 8508.37 6870 4760 8253.66 - 9202.63 8160 7020 - - - - 4-1/2" 12.6# L-80 28-9166 4-1/2" Baker Packer 9045 t3CAA\NSD DEC 1 ~ 2.005 RBDMS 8Ft () 3 2005 Tubing pressure 200 120 Service WDSPl Title Data Mgmt Engr Date 10/28/2005 L Submit Original Only ~ · e e .. 0-29 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I~C'r.Ì'fY[j~TE I SUMMARY 10/4/2005 ***WELL SHUT IN ON ARRIVAL***(pre-LDL) RAN IN W/ 4.5 OM-1 AND 1.75 LIB TO STA. #6 THEN STA. #7 W/ SAME. LIB MARKS APPEAR TO BE THAT OF AN RM LATCH. CONCLUDE VALVES ARE SET IN POCKET. PULL 41/2" XXN PLUG FROM XN NIPPLE AT 9133'. RIH WITH 41/2" XX PLUG..... *** CONTINUE TO 10/05/05 *** 10/5/2005 *** CONTINUE FROM 10/04/05*** ATTEMPT TO SET XX-PLUG. (PLASTIC COATING FROM TUBING IN PLUG) BRUSH & FLUSH TBG. SET 4.5 XX-PLUG @ 9059' (SLM) (43" OAL, 9 3/16 EQU. PORTS, 23.5" FILL EXT.). RAN CHECK SET (GOOD SET). **** WELL LEFT SHUT IN AND TURNED OVER TO DSO **** FLUIDS PUMPED BBLS 286 31 317 I f~;~L RE: D-29 Cancel Waiver Notice ') <Kt{4 1l~laS \£65--?-53 Subject: RE: D-29 Cancel Waiver Notice From: "GPB, GC1 Wellpad Lead" <GPBGCl WellpadLead@BP.com> Date: Mon, 29 Aug 2005 12:53:54 -0800 , , ,: T~: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>, jirrl_regg@admin.state.ak.us, winton_aubert@admin.state.ak.us, "Rossberg, ,R Steven" , <~ossbeRS@BP.com>, "NSU, ADWWell Oper~tîons Supervisor" . <NSUADWWellOperationsSupervisor@BP~com>, "GPB',GC I' Area' Mgr'~'<GPBOCITL@BP.com>, "GPB, .Wells,()pt'Eflg", <GPBWellsOptEng@BP.com>, "GPB, Optimization Engi' ' <GPBOptimizationEng(@BP..com>" "GPB, Öps Mgr"<GPBOpsMgr@BP.com>, "OPB, Optimization Engrtl '<GPBOpti111izationEngr@BP ~cöm>, "Younger, Robert ,0"" <'I ounger2@BP .com> ~ "Engel, Harry R" <EngelHR@BP . com> , tlGPB~, Well Pads; I)fG" . <GPBWellPadsÐFG@BP;com>, . ,', CC: "Dube,Anna T" '<Anna~pube@BP.com> ,"Re~ve~,DQnald F" <Reevespf@BP . call:> ; "Hughes, Arldrea (VECQ)" <hugha4@BP.com>, "Luckett,Ely Z~ (VECO)" <luckez@BP.com>: fTD~ Iß5Z53b Completed 08/29/05 From: NSU, ADW Well Integrity Engineer Sent: Sunday, August 28, 2005 8:53 PM To: Jim_Regg (jim_regg@admin.state.ak.us); AOGCC - Winton Aubert (winton_aubert@admin.state.ak.us); Rossberg, R Steven; NSU, ADW Well Operations Supervisor; GPB, GCl Area Mgr; GPB, GCl Wellpad Lead; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Ops Mgr; GPB, Optimization Engr; Younger, Robert 0; Engel, Harry R; GPB, Well Pads DFG Cc: Dube, Anna T; Reeves, Donald F; Hughes, Andrea (VECO); Luckett, Ely Z. (VECO); NSU, ADW Well Integrity Engineer Subject: D-29 Cancel Waiver Notice All: The waiver for well 0-29 is canceled and the well has been reclassified to a Trouble well. During the annual MITOA, bubbling was observed once the OA pressure was raised to 1000 psi. The well is currently waivered for slow TxlA communication and a passing MITOA is required to maintain the waiver. Jerome/Charlie: would you please confirm that the laminated Waiver sign and the "Waiver Well" plaque on the well house is removed. Please call if you have any questions. Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100, x1154 Email: NSUADWWelllntegrityEngineer@bp.com c', t" ~ i\i i'-î :,:: \--, (' C D C) ,", ,) 0 Il :":" ~\JJ-¡, ". 'J ~~~~ "n.. :_,~} .... JLJ.J 1 of 1 "'-9/9/20052:43 PM Schlumbel'ger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Z-15 l'3ð'- uZ? L5-17A 1 G'''; -À.l3 DS 04-26 I J S-- )1'1 S-14A ')...:j t.; - 0" . G-27 '8C-/r<D DS 05-20B ~ t....¡ .. J..) 'f E-37A ). C ç - út J.- D-29 I ~ .>--- )..,s- J L2-28 Ii: j- - C 3 ~- C-13A i q 7 - I L{ J OWDw-sw/lJ t·- .,l3Y 06-08A lC]r- q r 12-29 J 3'f - t, O)"J.. C-19B},G '.:,- c.::: r' G-27 J Sl~ ~ I ç(,p F-02A Ä V~î.. (: vi 4 03-33B ). CJ 5- - 6J~ MPK·22 .Ä (,-j- - C.À.. 2- BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 11084273 11075898 11072873 10893047 10942221 10942220 10928640 11084274 11076453 11075900 10893096 11062628 11072867 10928632 10942221 10928630 10913011 10893106 JI SCI\NNED SEP 0 7 2005 Log Description PPROF W/DEFT/GHOST/CALlPER MEM PPROF W/DEFT/GHOST PRODUCTION PROFILE LEAK DETECTION LOG MEM PPROF & IPROF MEM INJECTION LOG MEM PPROF, IPROF & WARMBACK RST RST MCNL RST -BORAX CHANNEL DETECTION LOG RST RST MCNL MCNL MCNL USIT PDC-GR USIT Date 07/08/05 07/03/05 07/30/05 10/17/04 06/29/05 06/26/05 06/14/05 07109/05 07/27/05 07/05/05 03/24/05 05/17/05 07/07/05 05/12/05 06/29/05 05/08/05 03/19/05 04/20/05 f~ .ü'\\ \-- 08/30/05 NO. 3460 I ª5~d..-.Ø Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Color CD _co 1 1 1 1 1 1 1 1 1 1 ì 31 J. 3 íJ).).'i i 3).) r j J.l;l ~ ) 3117 }:?1..J..8 j.5 .2 2 ~l I ~ À 3t: 13 l. J í ,»)' J 'ot. ~,..- Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 995?..3.-~8'38 ~." .¡µ~., , ATTN: Beth ../ 1/ kf /' j . f "/¡"' ~' ,,/ Received by: f(f(~ ~,- L.J . / MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supe~isor DATE: April 20, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit D Pad Friday, April 20. 2001: I traveled to BPXs D Pad and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report indicates ! witnessed the testing of 20 wells and 40 components with 1 failure. The surface safety valve on well D-06 had a slow leak when pressure tested. This valve was serviced and the retest witnessed on this date. Merv Liddlow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection of the well houses on this pad was performed during the SVS testing with no problems noted. All well houses inspected were reasonably clean and all equipment appeared to be in fair conditions. Summary: I witnessed the semi annual SVS testing at BPXs D-Pad. PBU D Pad, 20 wells, 40 components, 1 failure 2.5% failure rate 25 wellhouse inspections Attachment: SVS PBU D Pad 4-20-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU D Pad 4-20-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe/PBU / D Pad Separator psi: LPS 154 Date: 4/19 & 4/20 HPS 660 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI , PSI Trip Code Code Code -Passed GAS or CYCLE D-01A 1970780 154 125 125 P P OIL D-03A 2001340 154 125 125 P P OIL D-04A 1871250 D-05 1700060 660 550 450 P P 0IL D-06A 1970430 660 550 600 P 4 OIL , , D-07A 1931570 660 550 525 P P 4/20/01 OIL D-08 1790360 D-09A 1990850 660 550 525 P P OIL D-10 1790530 660 5501 525 P P OIL ,,, D-11A 1951830 660 550! 525 P P OIL D-12 1800150 660 550! 530 P P OIL D-13A 2000810 D-14A 1961530 D-15A 1972120 , ,, D-16 1811710 660 550 500 P P OIL , D-17A 1960460 D-18 "1811880 ' ' ' D-26 ' 1820440: 154 125' '120 P P OIL ,, D-21 18205201 154 125 125 P P OIL D-22A 1972040, D-23A 1961880' 660 550 525 P P OIL , , D-24 1852990 , D-25A 2000240 154 125 100 P P OIL D-26A 1970870 660 550 525 P P OIL ~ ,, D-27 1860330 660 550 550 P P OIL , , D-28A 1952130 660 550 550 P P OIL , D-29 185253~ 154 ,125 110 ,P , P OIL D-30 1960260 D-31A 1960950 660 550 550 P P OIL D-33 1960360 660 550 550 P P OIL ,, , RJF 1/16/01 Page 1 of 2 SVS PBU D Pad 4-20-01 CS 11 , , 11111 , , i, , i i i i , I I I II I I _. J_ _ ~ ~ ..... I Well Perlnit / Se0ar Set [ L/P ~tI T.t '/~estI'' 'bate I o Wna, Gi lj, I Number Number/ PSI PSI i Trip Coa~ ICoa~/Code/ Passed laASorCVC~E Wells: 20 Components: , , ,40 Failures: .~. 1 Failure Rate: 2.150% Ulo0 Day Remarks: The surface. safety,va ,lye on we,l! D-6,had slo.,w, !e .ak~whe~, pre ,, .ssu. re.test .et_l,.,, Va[, ,ve.,w~ serviced and retested same day., , RJF 1/16/01 Page 2 of 2 SVS PBU D Pad 4-20-01 CS ALA,?" OIL AND GAS CONSERVATION COMMISSIr'-' REPORT SUNDRY WELL OP ATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Plugging.__ Pull tubing__ Alter casing __ Repair well__ Perforate Other × 2. Name of Operator BP Ex~)loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora.cle, Alaska 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 430' NSL. 731' EWL, SEC. 13, T11N, R13E, UPM At effective depth 634'NSL, 912'EWL, SEC. 13, T11N, R13E, UPM At total depth 671'NSL, 943'EWL. SEC. 13, T11N, R13E, UPM 5. Type of Well: DevelopmenX Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 72. 74 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number D-29 (14-13-11-13) PBU 9. Permit number/approval number 85-253 / 9-675 10. APl number 50-029-21470 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10170 feet BKB 9206 feet 10060 feet BKB 9108 feet Plugs (measured) Junk (measured) fill at 10060' (10/89) Casing Length Size Structural -- Conductor 110 20x30 Surface 2639 13 3/8 Intermediate 9362 9 5/8 Production -- Liner 1065 7 Perforation depth: measured 9963'-9978', 9984'-10005' .q.q 7R'-.q.qR4 ' Cemented 8C.V. 3721 c.f. 2031 c.f. Measured depth True vertical depth BKB 138 138 2667 2667 308 c.f. 9100-10165 8253-9202 Sqzd: 9903'-9915', 9926'-9936', 9960'-9963', true vertical~8u9b~,.a8988' (two intervals) 0 RI GiN A L Tubing (size, grade, and measured depth)~ 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' PackersandSSSV (typeandmeasureddepth~5/8"BakerpackeratgO45';41/2"SSSVat2~~' ~' ~ ~ ~/ ~ ~ 13. Stimulation or cement squeeze summar~ee attachment .~ r ~ _, Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 850 1620 30 0 1510 2522 60 0 Tubing Pressure 173 184 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Opere~ions ~r I OilX Gas Suspended 17. I hereby, cert~y that, the ~going is t[u~/~)x:l correct to the best of my knowledge, S ig n e d'~.~_/~~"/~~~ Title TechnicalAssistantlll Form 10-404 F~v 06/'~5/8'8 .... Service SUBMIT IN DUPLICATE WELL D-29(14-13-11-13) NRWO/Reperf/Addperf Operations 1/3/96 A NRWO Sandback (Cement Squeeze) was performed using the following fluids: SUMMARY Bullhead killed. Injectivity was 5.4 BPM/600 psi, 2 BPM/0 psi. Tagged at 9994'. Correct to 10002'. Sanded back to 9949'. Sand plug #1: 850# 20/40 CL calculated to fill 41'. Actual = 33'.Sand plug #2: 400# 20/40 CL calculated to fill 19'. Actual = 20'.Lost injectivity between stages due to perf plugging. Inj dropped to 2 BPM/410 psi. Pumped 24 bbls acid. Injectivity improved to 2 BPM/180 psi. Over displaced w/approx 250 bbls. Large volume due to downtime with portable generator and the need to prevent gas entry while WO repairs. Squeezed w/18 bbls cement to 3500 psi, aggressive ramp. 3000 psi PT bled 70 psi/10 min. Approx 3 bbls behind pipe. LRO to 9939'. Recovered 14 bbls cement (1 bbl left in the sump). 1650 psi PT was jug tight. BBLS. 458 12 11 198 24 375 2O 18 296 66000 FLUIDS PUMPED Filtered Seawater 40# HEC gel 40# HEC gel w/1250# 20/40 CL FSW displacement and cool down. 15% HCI/10% Xylene FSW displacement and cool down. Fresh water Cement FSW LRO, jet passes, final RO. scf N2 1/25/96 The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9982' - 10005' MD 1/28/96 7/15/96 The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9980' - 10000' MD The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9982' - 10005' MD 'STATE OF ALASKA AI_A'5"KA OIL AND GAS CONSERVATION COMMISS~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc, 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 1986' SNL, 1067' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 430' NSL, 731' EWL, SEC. 13, T11N, R13E, UPM At effective depth 634' NSL, 912' EWL, SEC. 13, T11N, R13E, UPM At total depth 671' NSL, 943' EWL, SEC. 13, T1 IN, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB 10170feet Plugs (measured) 9206feet lO060feet Junk (measured) 9108feet 6. Datum elevation (DF or KB) KBE= 72.74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-29 (14-13-11-13) PBU 9. Permit number 85-253 10. APl number 50- 029-21470 11. Field/Pool Prudhoe Oil Pool fill at 10060' (10/89) Casing Length Structural -- Conductor 110 Surface 2639 Intermediate 9362 Production -- Liner 1065 Perforation depth: measured Size Cemented 20x30 8 c.y, 13 3/8 3721 c,f, 9 5/8 2031 c.f. 7 308 c,f, 9963'-9978', 9984'-10005' Measured de~h True vertical depth BKB 138 138 2667 2667 9390 8509 9100-10165 8253-9202 Sqzd: 9903~9915~ 9926~9936~ 9960~9963~ 9978~9984' true vertical subsea 8950'-8988' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9045'; 4 1/2" SSSV at 2047' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Represent~ive Daily Average Pmduction orln!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pmssure 850 1620 30 0 1510 2522 60 0 Tubing Pressure 173 184 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations X Oil X Gas Suspended 17.1 herebY/~rtifythat the~e~ing is true and correct to the best of my knowledge. Service Form 10-,~04 Rev 06~ 5/88 Title Supervisor Gravity Drainage SUBMIT IN DUPLICATE WELL D-29 (14-13-11-13) PBU STIMULATION OPERATIONS A coiled tubing HCL stimulation was done for well D-29 on February 16, 1991. Ran in hole with well flowing and tagged TD at 10021'. Loaded well with seawater and pumped acid as per schedule while recip over perf interval 9963-100005'. Pumped down back side during job to deter migration uphole. Wellhead treatment pressure never exceeded 1050. Unable to tell if there was much diverting action. Immediately went to N2 to recover spent acid and Icad volume. Recovered 276 BBLS by end of job. Well put back on production and tested. REEEIVED Naska 0il & Gas Cons. Anchorage mr/3/1/91 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 06/01/90 EXXON T# 81220 PHILLIPS---- ~ ~o"T~T E OF~ - AHVHiVES SYSTEM Tape & Transmittal Only BP MAGNETIC., LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-29 CH/CNL 05/22/90 #2 9307-10100 Sch#73886 1600bpi 4 passes AP1#50-029-21470 F-09 C H/TDT- P 05/28/90 #1 9393-10122 Sch#73893 1600bpi 3 passes AP!#50-029-20403 ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. Dietz/S. McCurry Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/31/90 T#:81195 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-29 CNL 05/22/90 #'2 9370-10041 Sch 5" G-32 PROD/Data Fra 05/23/90 #1 - 9150-9500 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS A~I-C-R IV ES JUN .- ~ ~990 .011 & Gas Cons. Commission 'Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 29, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of ·Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, ~~rgogduct ion Engineering JAB: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIVED STATE OF ALASKA ,_ ~,SKA OIL AND GAS CONSERVATION COM~'SION REPOFrr OF SUNDRY WELL OPERA?iON Stimulate Plugging .. Alter casing Repair well 5, Type of Well: Development X Exploratory ... Stratigraphic Service 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1986' SNI., 1067' WEL, SEC. 23, TI 1N, R13E, UPM At top of productive Interval 430' NSL, 731' EWL, SEC. 13, T11N, RI3E, UPM At effective depth 634' NSL, 912' EWL, SEC. 13, T11N, R13E, UPM At total depth 671' NSL, 943' EWL, SEC. 13, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Perforate Other_~.. 6. Datum elevation (DF or KB) KBE = 72. 74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-29 (14-13-11-13) PBU 9. Permit number/approval number 85.253 / 9-675 i 0. APl number 50- O29-21470 11. Field/Pool Prudhoe Oil Pool 10170feet BKB 9206feet Plugs (measured) lO060feet BKB 9108feet Junk (measured) fill at 10060' (10/89) Casing Length Size Structural -- Conductor 110 20x30 Surface 2639 13 3/8 Intermediate 9362 9 5/8 Production -- Liner 1065 7 Perforation depth: measured 9963'-9978', 9984'-I0005° Cemented 8 c.y. 3721 c.f. 2031 c.f. 308 c.f. Measured depth True vertical depth BKB 138 138 2667 2667 9100-10165 8253-9202 Sqzd: 9903'-9915', 9926'-9936', 9960'-9963', 9978'-9984' true vertical subsea 8950'-8988' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9045? 4 1/2" SSSV at 2047' FCE!VED 13. Stimulation or cement squeeze summary 14. Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X see attachment Intervals treated (measured) Treatment description including volumes used and final pressure Renresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl 3590 3756 36 1530 1242 15 16. Status of well classification as: Oil X Gas Suspended Casing Pressure 0 0 Tubing Pressure 931 183 Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~'~[~.~.~ Title Manager Production Engineering Form 1~;~04 Rev 06/15/88 ~ ~f SUBMIT IN DUPLICATE WELL D.29 (14-13.11-13) PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as follows: 10/8/89 Rigged up CTU and support equipment and pressure tested BOP's to 4000 psi. Pumped cement and squeezed existing perforations. Squeeze broke down while reversing out. 10/10/89 Resqueezed well and reversed out. 10/11/89 Performed inflow test, okay. 10/14/89 Rigged up Atlas Wireline and reperforated the following interval using 3 3/8" cartier guns at 4 spf: 9963' - 9978' MD BKB All depths are referenced to BHCS, 12/6/85. Could not perforate deeper intervals due to fill in hole. 10/16/89 Performed nitrogen lift. 10/23/89 Performed fill cleanout with coiled tubing. 10/25/89 Rigged up Schlumberger and perforated the following intervals using 2 7/8" carrier guns at 4 spf: Reperf 9984' - 10000' MD BKB Add perf 10000' - 10005' MD BKB Returned well to production and tested. jam 1/23/90 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 10/30/89 Transmittal: 80490 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-29 Perf 10/25/89 91 9500-10033 Sch Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR ARCHIVES 0il & GaS CONS. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 10/16/89 Transmittal: 80485 From: Information Control Well Records LR2-1 Subject: BP CASED BOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-29 CCL 10/14/89 91 8700-9972 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES ._ Gas Cons, BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 7, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V..Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the wello Yours very truly, J. A. Bragg Manager Production Engineering JAM: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RErE!VED .q!aska Oil & Gas Cons. Commissior~ Anchorage .. 1. Type of Request: OIL AND GAS CONSERVATION COMMi~._..~N APPLICATION FOR SUNDRY APPROVALS Abandon ~ Suspend Alter casing ~ Repair well Change approved program ~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Operation Shutdown Plugging Pull tubing ~ Variance ' 5. Type of Well: Development x Exploratory __ Sffatigraphic__ Service 4. Location of well at surface 1986' SNL, 1067' WEL, SEG. 23, T11N, R13E, UPM At top of productive interval 430' NSL, 731' EWL, SEC. 13, T11N, R13E, UPM At effective depth 655' NSL, 929' EWL, SEC. 13, T11N, R13E, UPM At total depth 671°NSL, 943'EWL, SEC. 13, T11N, RI3E, UPM '~12. Present well condition summary Total depth: measured 10170 feet true vertical BKB 9206 feet Re-enter suspended well Time extension Stimulate Perforate Other x 6. Datum elevation (DF or KB) KBE= 72.74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-29 (14-15-11-15) PBU 9. Permit number 85-253 10. APl number 50- 029-21470 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 10121 feet Junk (measured) true vertical BKB 9162 feet Casing Length Size Cemented Structural ' ' ' --' ....... Conductor 110 20x30 8 c.y. Surface 2639 13 3/8 3721 c.f. Intermediate 9362 9 5/8 2031 c.f. Measured depth 138 2667 True vertical depth BKB 138 2667 8509 Production Liner 1065 7 308 c.f. 9100-10165 8253-9202 Perforation depth: measured 9903'-9915', 9926'-9936', 9960'-10000' true vertical subsea 8894'-8984' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Oil & G~s Cons~ Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9045'; 4 1/2" SSSV at 2047' Ancnora§e, 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation August 1989 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby 'certjf'~h~ th,~oregoing is true and correct to the best of my knowledge. Si~lned ._/~ ]'itle Manager Production Er~ineering /'l=OR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Original Signed 19y Approved by order of the Commission David W. Johnston Form 10-403 Rev 06/15/88 15. Status of well classification as: Suspended __ Date ~_~,x~ ~-~i~f.;~ ~,v~.,~ vvr, Returned ~missiCner Bate ~~ SUBMIT IN TRIPLICATE , 3. 4. 5. 6. STATE SUNDRY NOTICE Well D-2~ Well D-29 needs a GSO cement squeeze with coiled tubing, The program involves squeezing all perforations followed by reperforation. A summary of the planned procedure is as follows: 1. MIRU coiled tubing unit, Acid wash the perforations. Liquid pack the well and cool the reservoir. Jet with surfactant to cleanse the perfs of oil carry over, Cement squeeze all perforations up to 3500 psi differential. .. Reverse out cement after holding squeeze for 30 to 40 minutes, Reverse in nitrogen blanket for freeze protection. 8. _ Leave wel! with WHP sufficient to maintain 500 to 1000 psi positive differential at perforations for WOC period, 9, Inflow test well by releasing trapped nitrogen blanket, 10. Resqueeze well if test shows inflow, 1 1, If no Inflow is observed then reperforate as follows' 9963'-9978' Ref, 12/06/85 BHCS 9984'-10005' 9912'-9916' Contingent upon well flowing 12, Put well on production. PRH.8/4/89 Coflcd Tub£ng J31o~-O~t-Prcvcntkrs Cai{ed Tubing · Pacl<-Of?  B{ind Rams -,=, / Cuf,~er Rams · C¢~~_~ ' 2' Chk:ksan (KI[I Line) · Slips .Pump-in Sub W eli Head Pipe Rams (Circu~ te/R e turn --'r-L-~' Swab Valve ;o BP EXPLORATION TO.- .. REFERENCE: HOUSTON ARCO CEEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES ~ · BP'CASED HOLE FINAL LOGS . BP Exolomt,on (Alaska) In: 900 Eas~ Benson Boulevan3 P.O. Box 196612 Anchomg~ Alaska 99519-6612 {907') 561-5111 Date: T~: 80022 The following material Is being subml~red herewith. Please acknowledge receipt by signing a copy of this le~er and returning It to this office: D-05 CCL/GR 04-27-89 #1 10100-10746 SCh 5" D-05 REPERF-R 04-25-89 #1 10550-10560 Sch 5" D-29 ?ROD-F 04-23-89 #1 9800-10050 Sch 5" W-20 CNL (2½"Tool) 04-26-89 #i 9300-9850 Sch 5" F-32 CBT 04-25-89 #1 9532-10803 Sch 5" F-32 CET 04-25-89 #1 9532-10807 Sch -5"" Q-05 PUNCHER & PLUG -04-26-89 #1 9000-9317 Sch 5" Rece i ved Date Standard Alaska Production Company 900 East Benson Bouievcr''''~- P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) ,561-5111 STANDARD ALASKA PRODUCTION October 20, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB:JAM'~ Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 D-29 Well File ~d~eering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA A~ OIL AND GAS CONSERVATION COMMISS'TO"N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate ~( Plugging Perforate.. Pull tubing... Alter casing Repair well Other 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, SEG. 23, T11N, R13E, UPM At top of productive interval 430' NSL, 731' EWL, SEC. 13, T11N, R13E, UPM At effective depth 655' NSL, 929' EWL, SEC. 13, T11N, R13E, UPM At total depth 671'NSL, 943'EWL, SEC. 13, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB 5. Type of Well: Development Exploratory Stral~graphic Service 10170feet Plugs (measured) 9206feet 6. Datum elevation (DF or KB) KBE = 72. 74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-29 (14-13-11-13) PBU 9. Permit number/approval number 85-253 / 8-74O 10. APl number 50- 029-21470 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 10121 feet Junk (measured) true vertical BKB 9162feet Casing Length Size Cemented Measured depth Structural -- Conductor 110 20x30 8 c.y. 138 Surface 2639 13 3/8 3721 c.f. 2667 Intermediate 9362 9 5/8 2031 c.f. 9390 Production -- Liner 1065 7 308 c.f. 9100-10165 Perforation depth: measured 9903'-9915', 9926'-9936', 9960'-10000' True vertical depth BKB 138 2667 8509 8253-9202 13. Stimulation or cement squeeze summary Intervals treated (measured) true vertical subsea 8894'-8984' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9045'with 4 1/2"tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at g045'; 41/2" SSSV at ~, ,~, C ~ ! V ~ '~ 14. see attachment Treatment description including volumes used and final pressure OCT 2 .~ ~::/. ~i~ & 6.% Co~s, Reoresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 233O 4884 23 0 222 Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 3730 7542 38 0 16. Status of well classification as: Oil X Gas. Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 316 Signe'~ ~ Form 10-4~ev 06/15/88 ~'~~ Title Mana~ier Production Engineering SUBMIT IN DUPLICATE WELL D-29 (14-13-11-13~ PBU STIMULATION OPERATIONS A mud/clay acid wash was pcrformcd October 1, 1988 on thc following perforated intervals in Well D-29. 9903' - 9915' MD BKB 9926' - 9936' MD BKB 9960' - 10000' MI) BKB The treatment was pumped via coiled: tubing as follows: · 118 bbls. 15% HCI w/diverter 65 bbls. 6% HCI - 1.5% HF w/diverter 24 bbls. NH4CI brine 121 bbls. clay acid (8% HBF4) 5 bbls. 2% NH4CI to displace acid 1' from wellbore The well was IeR shut in two hours then the pcrfs were washed with 24 bbls. xylenc. The well was then 'retumcd to production and tested. : jm 10/12/88 Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION September 27, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB:JAM Enclosures (9) cc: L. Burke (MB12-1) D-29 Well File /~~A. Bragg ~ anager Production Engineering A unit of the original Standard C~I Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program r'l Plugging [] Stimulate Pull tubing I"1 Amend order [] Perforate [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 430' NSL, 731' EWL, SEC. 13, T11N, R13E, UPM At effective depth 655' NSL, 929' EWL, SEC. 13, T11N, R13E, UPM At total depth 671' NSL, 943' EWL, SEC. 13, T11N, R13E, UPM 11. Present well condition summary Total depth: measured 10170feet ,/ Plugs (measured) 5. Datum elevation (DF or KB) KBE = 72.74 AMSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-29 (14-13-11-13) PBU 8. Permit number 85-253 9. APl number 5 0 - 029-21470 10. Pool Prudhoe Oil Pool true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 S u rface 2639 I nte rm ed i ate 9362 Production -- Liner 1065 Perforation depth: measured BKB 9206 feet 10121 feet BKB 9162 feet Size 20x30 13 3/8 9 5/8 Junk (measured) Cemented 8 c.y. 3721 c.f. 2031 c.f. 7 308 c.f. 9903'-9915', 9926'-9936', 9960'- 10000' true vertical subsea 8894'-8984' (three intervals) Measured depth True Vertical depth BKB 138 138 2667 2667 9390 8509 Tubing (size, grade and measured depth) 9100-10165 8253-9202 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9045'; 4 1/2" SSSV at 2047' 2. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation October 1988 4. If proposal was verbally approved Name of approver Date approved 5. I hereby~ertif, y that the ~re/~oing is true and correct to the best of my knowledge Signed (,..~.~ ,~.'.~~ Title Manager Production Engineering ,~// Or (-,/ ' Commission Use Only Conditions' (p(' approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance .~p~roved Copy Approved by IApproval No. Returned ORIGINAL SIGNED BY --~' "',~Y'~ -'-~--- '~'" by order of LONNIE C. SMITH Commissioner the commission Form 10-403 Rev 12-1-85 Submit in triplicate WELL D-29 (14-13-11-13) PBU STIMULATION PROPOSAL A mud/clay acid wash is proposed for the following perforated interval in Well D-29. 9903'- 9915'MD BKB 9926'- 9936'MDBKB 9960'- 10000'MDBKB The treatment will be pumped via coiled tubing as follows' 4500 gal. 15% HCI w/diverter 2500 gal. 6% HCI - 1.5% I-IF w/diverter 1000 gal. NH4CI brine 5000 gal. clay acid (8% HBF4) 400 gal. 2% NH4CI to displace acid 1' from wellbore The well will be left shut in two hours then the perfs will be washed with 1000 gal. xylene. The well will then be returned to production and tested. If the well does not sustain flow, a nitrogen lift will be performed. jm 9/23/88 Coiled Tubing Blow-Out-Preventers Coiled Tubing Blind Rams Cutter Rams ~ ~2"Chlcksan(KlllLlne) Pipe Rams (Circulate/Returns) Well Head Pump-In Sub Swab Valve INDEXED DAI.LAS A~CO STANDARD CHEVRON AL ASKA PRODUC_ 1-10N EXXON Date: 02/24/88 TEXACO 78597 TO: T#: MOBIL PHILLIPS REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by slgning a copy of this letter and returning it to thls office: 02/02/88 Camco Static Gradient 02/08/88 Camco " " 02/08/88 Camco " " 02/12/88 Camco " " 02/12/88 Camco " " 02/03/88 Camco " " 01/27/88 Otis " " 02/02/88 Camco " " 02/04/88 GO " 02/04/88 GO " 02/10/88 Camco " " 02/13/88 Camco " " 01/28/88 Otis " " 01/24/88 Otis " " 01/23/88 Otis " " 02/03/88 Camco " " 01/25/88 Otis " " 01/26/88 Otis " " I! 02/15/88 Camco 02/10/88 Camco " " TO: DALLAS ARCO CHEVRON E.~XON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD AL ASKA PRODUC TIOF',J Dale: 02/16/88 78555 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to this office: ~C-15 CCL/Perf. #1&2 8250-9740 GO 5" 01/i3/88 ~ C-16 CCL/Perf. 01/12/88 #1 7963-9350 GO 5" ~ D-3 CCL/Perf. 01/09/88 #1 10187-10600 GO 5" ~ D-8 CCL/Perf. 01/09/88 #1 9958-10300 GO 5" ~ D-12 CCL/Perf. 01/14/88 #1 8850-9200 GO 5" '-"-~ D-29 CCL/Perf. 01/10/88 #1 9500-10091 GO 5" ~"~ J-28 CCL/Perf. 01/04/88 #1 9870-11124 GO 5" ~ R-26A CCL/Perf. 01/02/88 #1 9150-9342 GO 5" ~ R-26A CCL/Perf. 01/18/88 #1 9100-9450 GO 5" X-8 Hydro/CFS 01/06/88 #1 9350-9800 GO 5" ~ G-16 Completion Positioning Log 02/12/88 #1 8670-9850 Sch r! Rece i ved  0il & Gas Cons. commissJc~ AJask~ Oate Anchorage A un,! OI *he. O,;g,,~ol 5*ondo,.d C~,l Co-pony ~Ou,,ded ,n (..le,,elond. 0~,o. ,n 1870 Victoria Aidridge I NFORMAT I ON CONTROL Wel I Records LR2-1 TO: DALLAS ARCO CHEVRON E~ON TE~V. ACO HO B IL PHILLIPS STATE OF ALASKA GEOSC IENCES INDEXED STANDARD · ALASKA PRODUCTION Date: 02/16/88 78555 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: "C~'~C- 15 CCL/Perf. 01/i3/88 #1&2 8250-9740 GO 5" 16 CCL/Perf. 01/12/88 #1 7963-9350 GO 5" ~.~ D-3 CCL/Perf. 01/09/88 #1 10187-10600 GO 5" D-8 CCL/Perf. 01/09/88 #1 9958-10300 GO 5" "-o D-L2 CCL/Perf. 01/14/88 #1 8850-9200 GO 5" ~D-29 CCL/Perf. 01/10/88 #1 9500-10091 GO 5" "-~ J-28 CCL/Perf. 01/04/88 #1 9870-11124 GO 5" ~ R-26A CCL/Perf. 01/02/88 #1 9150-9342 GO 5" ~ R-26A CCL/Perf. 01/18/88 #1 9100-9450 GO 5" X-8 Hydro/CFS 01/06/88 #1 9350-9800 GO 5" '~ G-16 Completion Positioning Log 02/12/88 #1 8670-9850 Sch 11 .R i Rece i~.z~~C~~ ~~ A~aska 0il & Gas Cons. Comm~s~c,~ Date Anchorage A un,! OI Ihe o¢;9,A, ol $~oe, clo~,d O,I l~ou,,ded ,n (le-elond. C~,o ,n 1870 Victoria Aldridge I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company 900 Fast Benson Boulevard ~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907! 561-5111 STANDARD ALASKA PRODUCTION February 1, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report Operations, for the above-named well. This subsequent report of perforating the well. of Sundry Well contains our JTB:JAM~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-29 Well File Yours very truly, J~. Brown, Supervisor Gravity Drainage A unit of the original ,Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASK-,-,-OIL AND GAS CONSERVATION COMM,_~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 72.74 AMSL Feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1986' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM 7. Well number D-29 (14-13-11-13) PBU At top of productive interval 430' NSL, 731' EWL, Sec. At effective depth 655' NSL, 929' EWL, Sec. At total depth 671' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 13, TllN, R13E, UPM 13, TllN, R13E, UPM 8. Approval number 7-967 9. APl number 50-- 029-21470 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 10170 feet 9206 feet BKB Plugs (measured) Effective depth: measured true vertical 10121 feet Junk (measured) 9162 feetBKB 12. Casing Length Structural -- Conductor 110' Surface 2639 ' Intermediate 9362 ' Production -- Liner 1065' Perforation depth: measured 9903'-9915' Size Cemented Measured depth True Vertical depth BKB 20"x30" 8 c.y. 138' 138' 13 3/8" 3721 c.f. 2667' 2667' 9 5/8" 2031 c·f. 9390' 8509' 7" 308 c.f. 9100'-10165' 8253'-9202' , 9926'-9936', 9960'-10000' true vertical (ss) 8894' - 8984' (three interVals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9045'; 4 1/2"' SSSV at 2047' Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 13. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2700 2028 0 0 200 Subsequent to operation 4360 2664 0 0 226 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Form 10-404 Rev. 12-1-85 Title Supervisor Gravity Drainage Date Submit in Duplicat~ W~ll D-29 (14-13-11-13) PBU Additional Perforating Operations The following additional interval was perforated January 10, 1988 using Gearhart 3 3/8" HSC Tru-Jet XVI carrier guns at 4 spf: 9960' - 10000' MD BKB (8948' - 8984' TVDss) Depths are referenced to BHCS, 12/6/85. k lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations. j~m 1/27/88 0800Z STATE OF ALASKA ALA~ OIL AND GAS CONSERVATION COM~rSSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging ~ Perforate [] Pull tubing [] Alter Casing ~ Other [] 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 430' NSL, 731' EWL, Sec. 13, TllN, R13E, UPM At effective depth 655' NSL, 929' EWL, Sec. 13, TllN, R13E, OPM At total depth 671' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 5. Datum elevation (DF or KB) KBE = 72.74 AMSL Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-29 (14-13-11-13) PBU 8. Approval number 7-967 9. APl number 50-- 029-21470 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 10170 feet Plugs (measured) 9206 feet BKB Effective depth: measured 10121 feet Junk (measured) " true vertical 9162 feetBKB 12. Casing Length Size Cemented Structural -- Conductor 110' 20"×30" 8 c.¥. Surface 2639' ].3 3/8" 3721 c.£. Intermediate 9362' 9 5/8" 2031 c.f. Production -- Measured depth 138' 2667' 9390' True Vertical depth BKB 138' 2667' 8509 ' Liner 1065' 7" 308 c.f. Perforation depth: measured 9903'-9915', 9926'-9936' , 9960'-10000' true vertical (ss) 8894' - 8984' (three intervals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5 Baker packer at 9045'; 4 1/2" SSSV at 2047' Stimulation or cement squeeze summary 9100 ' -10165 ' Intervals treated (measured) Treatment description including volumes used and final pressure 8253'-9202' 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2700 2028 0 0 4360 2664 0 0 Tubing Pressure 200 226 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run E; 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Supervisor Gravity Drainage Form 10-404 Rev. 12-1-85 Date Submit in Duplicate Well D-29 (14-13-11-13) PBU Additional Perforatlng 0peratlons The following additional interval was perforated January 10, 1988 using Gearhart 3 3/8" HSC Tru-Jet XVI carrier guns at 4 spf: 9960' - 10000' MD BKB (8948' - 8984' TVDss) Depths are referenced to BHCS, 12/6/85. A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations. j~m 1/27/88 0800Z Standard Alaska Production Cornpc 900 Ec~st Benson Bo~,~,~Ja',"t,,,,~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION~ December 18, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, JTB:JAM~% Enclosures (g) cc: J. L. Haas (MB12-1) D-29 Well File J. . Brown, Supervisor Gravity Drainage RECEIVED ~: 2 '~ 1987 Alaska Oil & Bas (~ons. Commission Anchorage A un,t of the original Standard Oil Company Founded in Cleveland. Ohio, in 1870. STATE OF ALASKA AL~,~_,.~ OIL AND GAS CONSERVATION Cb~vf~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate~l~ Other [] 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval (top Ivishak/Sadleroch-Et) 430' NSL, 731' EWL, Sec. 13, TllN, R13E, UPM At effective depth 655' NSL, 929' EWL, Sec. 13, TllN, R13E, UPM At total depth 671' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 5. Datum elevation (DF or KB) K.BE = 72.74 AHSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-29 (14-13-11-13) PBU 8. Permit number 85-253 9. APl number 50--029-21470 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10170 9206 10121 9162 Casing Length Size Structural -- Conductor 110 ' 20 "×30" 8 cu. yds. Surface 2639' 13 3/8" 3721 c.f. Intermediate 9362' 9 5/8" 2031 c·£. Production -- Liner 1065 ' 7" 308 c.f. feet Plugs (measured) feet B :,<.B feet Junk (measured) feet BZ4_B Cemented Measured depth Perforation depth: measured 9903' - 9915' 9926' - 9936! true vertica/[ss ) 8894' - 8924' (two intervals) Tubing (size, grade and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9045'; 4 1/2" SSSV at 2047' 12.Attachments Description summary of proposal ~ 138' 2667' 9390' 9100'-10165' True Vertical depth BKB 138' 2667' 8509' 8253'-9202' RECEIVED 2 ! 1987 Alaska 0il & Gas Cons. O0mmissi0n Annhnrnn~. Detailed operations program [] BOP sketa~h [] 13. Estimated date for commencing operation January 1988 14. If proposal was verbally approved Name of approver Date approved 15. ! hereby cert~,y~hat the foregoing is true and correct to the best of my knowledge Sighted (~.' ~ Title Supervisor Gravity Drainage a lT. Brown Commission Use Only Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Approved Copy Returned Commissioner Date i Approval NO. 7 '~ 9 ~;~ 7 by order of the commission Date /~,~ -~:~/-~ Form 10-403 Rev 12-1-85 Submit in triplicate Well D-29 (14-13-11-13) PBU Additional Perforating Proposal We propose to perforate the following intervals during January 1987 at 4 spf. Add'l. 9960' - 10000' MD BKB (8948' - 8984' TVDss) Depths are referenced to BHCS, 12/6/85. k lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations. 12/17/87 0800Z FLOW TUBES & PACKOFF BOWEN PACKOFF }-+--HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE FLOWLINE VALVE GREASE LINE GREASE ~MANIFOLD GREASE PUMP RISER BOP STATE OF ALASKA ,z~Ab.,.<A OIL AND GAS CONSERVATION C~,i~SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [i Suspend [_q Operation Shutdown ~ Re-enter suspended welt ~ Alter casing ~ Time exlension [} Change approved program [_-} Plugging ~ Stimulate [Z} Pull tubing ~ Amend order !13 Perforate .xs~ Other 2. Name of Operator 5. Datum elevation (DF or KB) STANDAR3) ALASKA PRODUCTION COMPANY KBE = 72.74 AMSL feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Localion of well at surface 1986' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval (top Ivishak/Sadlerochit) 430' NSL, 731' EWL, Sec. 13, TllN, R13E, UPM At oflective depth 655' NSL, 929' EWL, Sec. 13, TllN, R13E, UPM At total depth 671' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 7. Well number D-29 (14-13-11-13) PBU 8. Permit number 85-253 9. APl number 50--029-2 1470 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 10170 feet 9206 feet BKB -. Plugs (measured) Effective depth: measured 10121 feet Junk (measured) true vertical 9162 feet BKB Casing Length Size Cemented Structural -- Conductor 110' 20"x30" 8 cu.yds. Surface 2639' 13 3/8" 3721 c.f. Intermediate 9362' 9 5/8" 2031 c.f. Production -- Liner 1065' 7" 308 c.f. Perforation depth: measured 9903' - 9915' 9926' - 9936; true vertica/{ss) 8894' - 8924' (two intervals) Tubing (size, grade and measured depth) 4 1_/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) · .9 5/8" Baker packer at 9045'; 4 1/2" SSSV at 2047' 12.Attachments Measured depth True Vertical depth BK_B 138 ' 138 ' : 2667 ' 2667 ' 9390 ' 8509 ' 9100'-10165' 8253'-9202' Description summary of proposal .,~ Detailed operations program [-J BOP sketch 13. Estimated date for commencing operation January 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certi~that the foregoing is true and correct to the best of my knowledge ""W" %< ~¢~__. Title Supervisor Gravity Drainage Sig~ed U T. Brown Commission Use Only Conditions of approval ! Notify commission so representative may witness t Approval No. Ui Plug integrity ~ BOP Test E~ Location clearance[' Oate IZ/,?/~7 Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Approved Copy Returned - Commissioner by order of _~;~ ,he commi ioo Form 10-403 Rev 12-1-85 Submit in triplicate Well D-29 (14-13-11-13) PBU kdditional Perforating Proposal We propose to perforate the following intervals during January 1987 at 4 spf. kdd'l. 9960' - 10000' MD BKB (8948' - 8984' TVDss) Depths are referenced to BHCS, 12/6/85. k lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations. j 12/17/87 0800Z BOWEN PACKOFF FLOW TUBES & PACKOFF FLOWLINE Ft. OWLINE ~_ VALVE HAND PUMP GREASE SEAL FLOWTUBE GREASE LINE RISER BOP GREASE PUMP ~GREASE RESERVOIR Standard A~asba P~oduction Compan,, 900 Eost Ben,on Boul~*._~cl PO Box 196612 Anchofoge, AIo~.o ~519-6612 19071 564.5 I I I INDEXED DALLAS A~Co STANDARD c~Ewo~ ALASKA PRODUCTION EXXON Date: 08~05/87 TEXACO TO: Ti: 78106 MOBIL PHILLIPS STATE OF ALASKA REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning it to this office: A-1 07/09/87 Camco Static Gradient A-22 07/12/87 " " " A-26 07/09/87 " " " A-29 07/11/87 " " " A-32 07/13/87 " " " A-35 07/13/87 " " " D-9 07/21f87 " " " D-25 07/10/87 " " " D-26 07/10/87 " " " D-27 07/07/87 " " " D-28 07/22/87 " " " D-29 07/22/87 " " " G-19 07/08/87 " " " G-25 07/08/87 " " " G-31 07/07/87 " " " H-21 07/25/87 " " " H-22 07/25/87 " " " H-24 07/25/87 " " " H-26 07/25/87 " " " J-22 07/27/87 " " " U-2 07/17/87 " " " U-6 07/17/87 " " " U-8 U-12 X-2 Y-l-2 Rece I ved Date fOu,,ded ,n Cle-~'lond. 07/15/87 07/.27/.87 07/15/87 l~'{3 ! NFORMAT I ON CONTROL Wel I Records LR2-1 $1andmd Alaska Production Compa~ 900 East Benson P.O. Box 196612 Anchorage0 Alaska 99519-6612 (907! 564.51 I I DALLAS ARCO CHEVRON EXXON INDEXED STANDARD ALASKA PRODUCTION TEXACO Da+e: 0 6 / 30 / 87 lO: MOBIL TI: 78010 PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submltted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this offlce: A-16 D- 29 G-3 M-14 R-5 Flopetrol Prod. Log 06/05/87' #1 10600-10900 Sch 2" CNL-GR (2.5" TOOL) 06/20/87 #1 9300-10112 Sch 5" CNL-GR (3~/8"TOOL) 06/20/87 #2 8500-9291 Sch 5" Flopetrol Prod. Log 06/06/87 #1 110100-10500 Sch 2" Flopetrol Prod. Log 06/09/87 #1 8950-9210 Sch 2" JUL- 6 1987 Alaska 0il & 6as Cons. Commission Anchorage Received Date A un;I al Ihe o,iginal Standard O~1 Company Founded in Cle-elond. Ofllo. ,n 1870 Ce lina Plack NFORMAT I ON CONTROL Records LR2- I 900 Ease Ben,on 8ou/evord P.O. 8oK 196612 An(borage. Alaska 99.519-6612 ARCO 'EXXON STANDARD Date: 06/26/87 PHILLIPS T{: 7800 2 STATE OF AK PDBY Systems (Transmittal Only) SYSTEMS .(Transmittal & T~pe) ~ SAPC MAGNETIC LIS TAPES & LISTINGS ~he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: ,5~- ~__~.5~ ,'~o7~ CH-CNL ob72368 Tape Pos ~0 EDIT LIS 06/22/83 ~1 CH-CNL Job972371 Tape Pos. /~3 _ ~IT LIS .06/20/87 ~2 CH~ Job~72366 Tape Pos. 05306 05307 05308 Gas Cons. Commission Anchorage * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. Received A u.~l,! OI Ihe o,,~1,.~ol 5fondo,d (2),1 founded ,n Cle.eqond. Oi'~,o ,n 1870 Ce lina Plack INF(IRMATION (IkNRRDL Well Records LR2-1 51andmd Alaska P~oducllon Company 900 Em~ Ben~o,, Boo' J P O Bo~, 196612 Anchorage. AlosI'o 99.519-6612 1907) .564-5 11 I DALLAS ARCO C~EVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED . STANDARD ALASKA PRODUCTION Date: 04/06/87 TI: 77814 REFERENCE: SA~C CASED HOLE FINed5 LOGS The fol lowing material is being submitted herewith. Please acknowledge receipt by signing a copy of this leHer and returning it-to this office: .* B-8 B-30 D.-29 G-25 H-21 J-19 JX-2 ~-2 R-26 R-27 S-Ii Perf. Record 02/24/87 Cont. Flow/Spinner/T emp/Hydro Production Profile 03/29/87 #1 Perf. Record 03/26/87 #1 Production Log 03/27/87 #1 CH/CNL; 03/22/87 #1 Cont. Flow/Spinner/Temp/Fluid Density Perf. Record . :~ 03/02/87 #1 Temp/Leak Detection 03/26/87 #1 Production' Profile 03/16/87 #1 Collar 11/08/86 #1 #2 9350-9758 Sch' 03/12/87 #1 10700-12287 GO 5" 9700-9990 Camco 5" 9195-10506 Sch ~" 9290-9900 Sch 5" 9550-10245 GO 5" 03/08/87 #1 9900-11660 GO 8520-9430 Sch 5" 2630-7840 Camco 5" 9300-9670 Camco 5" 8410-9780 Dres 5" 11 ' I~ecb I ved Dste 8 l~s ,~ ~ _ Victoria Aldridge I NFORHAT I ON CONTROL Wel I Records LR2-1 A un,! al Ihe or,e.l,nol Standard O,! Co,rpony Founded in Cie-elm,d. C~0o. ,n 1870 Standard Alasba Production Company 900 Eos! 8enson 8oulevo,~ P.O Box 196612 ~'"~ Anchoroge, AIo~,ka 99519-6612 1907) .564.51 I I INDEXED _ DALLAS ARCO CHEVRON EXXON TEXACO Date: 09/23/86 77350 ?0: MOBIL II: PHILLIPS STATE OF ALASKA GEOSCIENCES SI'ANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and retudnlng It to this office: CET 02/28/86 #2 8530-9300 Sch 5" CET 02/22/86 #1 8900-9760 Sch 5" Cont. Flow 08/09/86 #1 9150-9400 GO 5" CBT 02~13/86 #1 10500-11956 GO 5" CCL/Perf. 08/19/86 #1 10379-11944 GO 5" CCL/Perf. 08/20/86 #1 8350-9639 GO 5" CCL/Perf. 08/21/86 #1 10860-11156 GO 5" GCT 03/28/86 #1 38-11112 Sch 5" CCL/Perf. 08/13/86 #1 8955-10102 GO 5" Collar 08/16/86 #1 9450-10750 GO 5" Temp. 08/27/86 #1 0-800 Camco 5" CCL/Perf. 09/07/86 #1 10250-11400 GO 5" Temp. 08/27/86 #1 0-800 Camco' 5" Cont. Flow 08/07/86 #1 11500-12000 GO 5" Cont. Flow 08/02/86 #1 9800-10250 GO 5" Victoria Aldridge LR2-1 INFORMATION CONTROL Well Records LR2-1 Standard Alaska Production Company 900 EOSI Ben,on Boulevc.~._~ P.O. Box 196612 Anchoroge. Alosko 99519-6612 1907) 564-:~! I I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES (Transmittal Only) I NOEXED STANDARD ALASKA PRODUCTION Date: 09/11/86 TI: 77323 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and retuFnlng if fo this office: "~ A-31 ,-A-34 '-B-29 ~C-32 ~D-6 ~D-27 'D-29 ~G-19 ~H-21 "'-H-22 ~R-23 ""U- 11 "~.U- 12 Flowing Gradient 08/19/86 Camco " " 08/23/86 " BHPD & PBU 08/10/86 GO Static 09/05/86 Otis Static 08/30/86 Camco Static 09/06/86 Otis Static 08/29/86 Camco Static ' 08/30/86 Camco Static 09/04/86 Otis Static 08/20/86 Camco Static 08/27/86 Camco BHPD & PBU 08/08/86 CO BHPD & PBU 08/02/86 GO BHPD & PBU 08/02/86 GO Rece I ved Dste z- 2 2 !°,9 Alaska Oil & Gas Cons. Commission Anchorage Victoria Aldridge LR2-1 I NFORHAT I ON CONTROL Wel I Records LR2-1 A u,,,! of the ow,(j,n(jI ~lnn(l¢,~d C~I Co.npc,.y Iounded ,n (le-elond. C~,o. ,n 1810 Standard Alaska Production Company 900 East Benson P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 September 5, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well D-29 (14-13-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. PFB:JAM Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-29 Well File Yours very truly, Supe fyi s o r Reservoir/Production Surveillance Unit I RECEIVED SEP 0 8 Alaska Oil & ~as Cons, Anchorage A unit of the original Standard O~1 Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALA' , OIL AND GAS CONSERVATION COl~ SSION REPORT'OF SUNDRY WELL OPERATIONS 1, Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate ~ Pull tubing Alter Casing :~ Other, ~ 2. Name of Operator ST_.Z~JqDA~:~E) ALAS~%. PRODUCTION COM_PA_N-~ 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1986' SNL, 1067' WEL, Sec. 23, TllN, 1~.3E, UPM At top of productive interval 430' NSL, 731' EWL, Sec. 13, TllN, R13E, UPM At effective depth 655' NSL, 929' EWL, Sec. 13, TllN, R13E, UPM At total depth 671' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 5. Datum elevation (DF or KB) ~<;3~E = 72.74 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-29 (14-13-11-13) PBU 8. Approval number 196 9. APl number 50-- 029-21470 10. Pool Prudhoe Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 10170 feet Plugs (measured) 9206 feet B:~Q3 Effective depth: measured 10121 feet Junk (measured) true vertical 9162 feet 12. Casing Length Size Cemented Structural -- Conductor 66' 20"x30" 8 cu.yds. Surface 2623' 13 3/8" 3721 c.f. Intermediate 9346' 9 5/8"' 2031 c.f. Production -- Liner 1065' 7" 308 c.f. Perforation depth: measured 9903' - 9936' (two intervals) true vertical (subsea) 8894' - 8924' Measured depth True Vertical depth 110' 110' 2667 ' 2667 ' 9390' 8509' 9100 ' -10165 ' 8253 ' -9202 ' Tubing (size. grade and measured depth) 4 1/2" L-80 to 9045' with 4 1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9045'; 4 1/2" SSSV at 2047' Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED S EP 0 8 1986 AlasKa 0il & Gas Cons. Commission Anch0rage 13. Representative Daily Av~,rage Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 6720 5080 0 0 318 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ' Title Supvr. Res/Prod' Surveillance I Date Form 10-404 Rev. 12-1-85 Submit in Duplicate PERFORATING DATA - Well D-29 (14-13-11-13) PBU 7/17/86 Pressure tested tubing and inner annulus. 8/13/86 8/27/86 Installed and tested lubricator to 3500 psi for all well work. Rigged up Gearhart and perforated the following intervals for initial production using 3 1/8" hollow-steel carrier guns at 4 spf: 9903' - 9915' MD (8894' - 8905' TVDss) 9926' - 9936' MD (8915' - 8924' TVDss) All depths are referenced to BHCS/GR, 12/6/85. Put well on production and tested. Shut in well for initial static pressure survey. 8/30/86 Ran initial static pressure/temperature survey at 8800' TVDss. 9/2/86 Set and tested SSSV in ball valve nipple at 2047'. Well on production. jm 9/3/86 TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS GEOSC IENCES INDEXED STANDARD ALASKA PRODUCTION Date: 07/14/86 TI: 77179 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submll~red herewith. Please acknowledge receipt by slgnlng a copy of this letter and returning it to thls office= "'~A-29 Temp. Sur~,,ey 06/13/86 #1 10700-11145 Camco 5" '"--C-3 EPL 10/13/85 #1 0-10161 Sch 5"  CH-CNL 06/10/86 #1 10800-11939 GO 5" WOPITS 05/23/86 #1 10170-10538 Camco 5" ~'-~F-18 T~np. Survey 06/14/86 #1 11900-12300 Camco 5" "~G-16 Temp. Survey 06/11/86 #1 9300-10132 Camco 5" '~- H-27 Spinner/CCL 06/17/86 #1 10000-11400 Camco 5" "-~H-27 CBT 11/11/85 #1 10200-11436 Sch 5" "~K-8 CH/CNL 06/11/86 #1 10400-10890 GO 5" ~ Q-5 Temp/Spinner 06/16/86 #1 9800-10348 Camco 5" '--U-10 Cement Eval. Quick-look 10/23/85 #2 9523-10140 Sch 5" O ~ /e~ -~ Victoria Aldridge LR2-1 AJ~-$~3 ,-,: ~- ...... - .... '~ -:C-r INFC~C~MATION CONTROL Wel I RecOrds LR2-1 ' ~:'. °t '~'_'~"°'Y°'"°'" o, c ...... , Standard Alaska Production Company 900 East Benson Bouleva.~.,.~ P.O, Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 June 17, 1986 STANDARD ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: Well D-29 (14-13-11-13) PBU Enclosed, in triplicate, is Approvals, for the above-named perforate the well. Form 10-403, Application well. This contains our for Sundry proposal to PFB:JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) D-29 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. RECEIVED JUN 2 0 1986 Alaska 0ii & Gas Cons. Commission Anchorage STATE OF ALASKA ALASt DIL AND GAS CONSERVATION COMI~ 31ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon - Suspend - Operation Shutdown ~: Re-enter suspended well ~ Alter casing ~ Time extension-- Change approved program '- Plugging ~- Stimulate ~ Pull tubing %_ Amend order--_: Perforate X~ Other 2. Name of Operator 5. STANDARD ALASKA PRODUCTION CQMPAN~ 3. Address 6. P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 7. 1986' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 430' NSL, 731' EWL, Sec. 13, TllN, R13E, UPM At effective depth 655' NSL, 929' EWL, Sec. 13, TllN, R13E, UPM At total depth 671' NSL_, 943' EWL: R~_¢.. 13, TllN, R13E, UPM 11. Present well condition summary Total depth: measured 10170 feet Plugs (measured) true vertical 9206 feet BKB Datum elevation (DF or KB) KBE = 72.74 (correctedf)eet Unit or Property name Prudhoe Bay Unit Well number D-29 (14-13-11-13) PBU 8. Permitnumber 85-253 9. APInumber 50--029-21470 10. Pool Prudho~_ Effective depth: measured 10121 feet Junk (measured) true vertical 9162 feet BKB Casing Length Size Cemented Structural Conductor. 66' 20"x30" 8 cu.yds Surface 2623' 13 3/8" 3721 c.f. Intermediate 9346' 9 5/8" 2031 c.f. Production __ Liner 1065' ?" 308 c.f. Perforation depth: measured true vertical Measured depth 110' 2667' 9390' 9100'-10165' True Vertical depth BKB 110' 2667' 8509' 8253'-9202' RECEIVED Tubing (size, grade and measured depth) JUN 2 0 1986 4 1/2" L-80 to 9045' with 4 '1/2" tailpipe to 9166' Packers and SSSV (type and measured depth) Alaska 0il & Gas Cons. 9 5/8" Baker packer at 9045'i 4 1/2" B'vTN at 2047' Anchorage 12.Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation June/July 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the forf~going is true and correct to the best of my knowledge Sig'~ned /~, F- /~~ TitleSupvr. Res./Prod. Surveillance IDate P. F. sartn Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. rq,, Plug integrity ~ BOP Test ~ Location clearancel / Approved Copy Returned ~ by order of Commissioner the commission Date Approved by " ' ;":~ ' Form 10-403 Rev 12-1-85 Submit in triplicate Well D-29 (14-13-11-13) PBU INITIAL PERFORATING PROPOSAL We propose to perforate the following intervals for initial production during June/July 1986 at 4 spf: 9903' - 9915' MD (8894' - 8905' TVDss) 9926' - 9936' MD (8915' - 8924' TVDss) Ail depths are referenced to BHCS/GR, 12/6/85. A lubricator will be installed and tested to 3500 psi for all well work. A SSSV will be set and tested in the ball valve nipple at 2047' at the completion of the job, jm 6/17/86 RECEIVED JUN 2 o l -5S Alaska Oil & Gas Cons. BASIC SYSTEM MAKEUP BOWEN PACKOFF' HAND PUMP GREASE SEAL FLOWTUBE F'LOWLINE GREASE LINE FLOWLINE VALVE GREASE ),,~ MANIFOLD ~LGREASE I RESERVOIR BOP ~UN20 '*' Gas Cons. SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EY~XON To DAL/UNIT/STATE: TEXACO (-.Marathon) MOBIL PHILLIPS STATE OF AK BPAE ._ CEOSCIENCES 31 1 I "C" STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-OOO0 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Da te: T#: 04/14186 76993 SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-32 A-33 B-16 B-27 D-25 Temp. Survey 04/04/86 #1 SURF.-2500 Camco Temp./Gas Lift Check 04/06/86 ~1 3400-11300 Camco Leak Detection/Spinner 03/29/86 #1 8800-10100 Camco Temp. Survey 04/04/86 #1 Surf.-2500 Camco Temp. Survey 04/02/86 ~1 Surf.-2500 Camco i . D-29 Temp. Survey 04/03/86 #1 Surf.-3000 Camco ~ff~u-- H-24 Temp. Survey 04/05/86 #1 Surf -2500 Camco ~ ~ , ~,[M~18..~'~mp~..Surv'eyj, ']-/~c+ 04/04/86' gl Surf.-2500 Camco ?~ C~~~-/ T-I -- Temp.-S~rvey '~'1"~'~04/04/86 gl Surf.-2500 Camco '~',~\z~I~T_7 Tamp Survey 04/05/86 gl Surf.-2500 Camco ~ e~~-, X-14 Spinner/CCL 03/30/86 gl 10500-11580 Camco i~,$~ x-25 Te~. Survey 04/0~/86 #1 Surf.-2500 Camco ! X-26 Injection Profile/Spinner 03/31/86 ~1 9250-9540 Camco DAL/ARCO/GEOS. ONLY: D-27 CBT 03/23/86 gl D-28 CBL/VDD 03/27/86 #1 11 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 8600-9723 Sch 5" 4 _ 9500-11150 Sch 5" / / ~-C~r::_,r-~, ' ( / ' "~,,.'~R 2 A~aska Victoria Aldridge LR2-1 INFOP~MAT I ON CONTROL WELL RECORDS LR2-1 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TEXACO MARATHON TO: MOBIL PHILLIPS STATE OF ALASKA BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 1-08-86 T#: 76685 REFERENCE: TELECO MAGNETIC DIRECTIONAL SURVEY (S) The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- STATE ONLY: D-29 12-05-85 MWD Directional Job # 453 TAK Teleco RECEIVED OATE -... Cathy Perkins LR 2-1 . __ ~9 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO EXXON TO PHILLIPS STATE OF AK 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 1-6-86 T#: 76670 REFERENCE: SOHIO HAGIIETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ~ D-29 OH LIS 12-06-85 Job # 304874 Tape Pos # 03517 GO * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. RECEIVED DATE Cathy PErkins LR 2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY S FO ^RC0 CttEVRON EXXON SF0/UNIT/ TEXACO lO STATE: ~ LA.rLATHON HOBIL PHILLIPS *STATE OF AK BPAE (Transmitnal Only) 3111 '°C" STREET ANCHOItAGf. ALASKA I'[LEPHONE I907I 265-0000 MAIL: POUCH 6-6 ! 2 ANCHORAGE. ALASKA 99502 Date - T#: 01/03/86 76667 *Date to State Via Drilling' REFERENCE SOHIO OPEN HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/UNIT/STATE: D-29 DIL 12/06/85 #1 9300-10184 GO 5" & 2" D-29 BHCS 12/06/85 #1 9300-10158 GO 5" & 2" D-29 CDL/CNLog-Poro 12/06/85 #1 9300-10187 GO 5" & 2" D-29 CDL/CNL-Raw 12/06/85 #1 9300-10187 GO' 5" & 2" STATE ONLY' DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Gyroscopic Directional Survey tit C£ ~vf[) I)A ! i Date:ll/24~85-Job#' 1185-024 12/02 85 Date'12/14/85 Job#' AK-BO-50123 Victoria Aldridge LR2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-O612 January 8, 1986 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-29 (14-13-11-13)PBU Gentlemen' Enclosed in duplicate is Fo~.~ 10-407, Well Completion Report, for the above-named well, together with the Daily Drilling Reports, Well Logs and Directional Survey. This well has been completed as a non-perforated oil well. Very truly yours, SOHIO ALASKA PETROLEUM COMPANY R. S. Allan Division Drill ing Engineer RSA/MAW/dg/O211D Enclosure Well File #17 Adrian Clark Jan Martin CC' RECEIVED Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA , ALASKA ¢~..,.AN D GAS CONSERVATION CO~-,~..'ISSION 'WELL COMPLETION OR RECOMPLETION i iI=PORT AND LOG 1. Status of Well Classification of Service Well OIL I~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 85-253 '3. Address RECEIVEE 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 so-029-21470 'i O 5 C 9. U nit or Lease Name 4. Location of well at surface {?~- i=\.i I © 1986' SNL, 1067' WEL, Sec. 23, Tll N, R13E, UPM "~ Prudhoe Ray lln~ lQ. Well Number At TOp Producing Interval ~Sk~ 0ii & Gas Cons. C01 lmmsi0n 429' NSL, 731' EWL, Sec. 13, TllN, R13E, U... Anchorage n-20 (14-!-t-ll-13~PBU At Total Depth 11. Field and Pool (,71' NSL, 943' EWL, Sec. 13, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay KBL = 70.84'I ADL 28285 Pr,Jdhne 0i! Pnn~ f I'1 (~'-N'°' °f C°mpleti°ns 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 11/21/85 12/06/85 12/10/85 N/A feetMSL I One 17. TotaIDepth(MD+TVD) 18."lugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost 1 O1 70 'MD 9206' TVD 10121 ' MD 91 62' TV )YES F~ NO [] 2047 feet MD ?nnn, 22. Type Electric or Other Logs Run DIL, BHCS, CDL/CN Log-Poro, CDL/ CNL-Raw 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE. WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"x30" Insulat~_~ Conduct,,r .q,~rfaca !!0' ~K" ~ ~U. ,,~ ,~-., " " ,z~-'. CC,qCi ~.~ 13-3/8" 72~ I-Rd Slitherer: 9RR7' 17_1 /~" ~7~ ~,, 9-5/8" 47~ I-Rd q,,~far= cm~n, ~-~/~" ~n~ ~,, ft Cl'~s ~' ..,,o~ ~_, g G~' ..................... ,~ ./~,o ~=, I su 9~n -,,. ft C!'"" (~ w/l% C, ,.-2 7" 26# L-80 .91[30' lrl165' 8-!/2" ~n~ .,, ¢+ e~... , nc. ~ ,.., 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. -- .... ~Ui~i~IG~FI, E~C~)~IDu - interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ~ a-~/2" 12 ~ n~, ~,~ ~,, . '- , , . ,.~ If LOCATIONS VERiFiED 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Surf. [ DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED B.H.._--.---.J (~ ~/~,,~ ~/~,, o~ ~,, ft ~ .... frost "C" ~.,, ~.~= fol lowed by Arcl r~ 27. PRODUCTION TEST Date First Production J Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL G~AS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. nite Form 10-407 0254D Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ' ' · · ' ' ' -:~ : ' '~ :~ ~ - '- ,'i~ . - :~ ': : , : ' ~. -~ - " GEOLOGIC MARKER'S '"-- "-', ' "-' '~ ~ ~ :FORMATION TESTS -- - .' --- NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. . ~ Sag River ss 9343' 8466.91 ' BKB Shublik FNI 9373' 8493.56' BKB Zone 4 Top Ivishak/ Sadlerochi t 9449' 8561.09' BKB 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ' ' Title :: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10407 Sohio Daily Drilling Report-- PBU November:20 ;~..] 985 at..-06O0 -;-h°ur-S "'-,: :=;c' - Rig Nabors 18-E AFE '#'120375 - -: =. - .';-;,:7';'{'::{s. ~. ' -:"* ' ":, Well: D.-29(14-13-11-13!_..~.xm '' ' ''' '--* ~ ....... ' .... 0600}.:.Depth· O' 24"-'HOur:-'Ftg· O' "-' . :- ' :' water Used· Current Operation' Breaking camp. Moving rig to D-29. MUD TYPE- WT' VIS- PV' YP' SURVEY ;. '~.: ..- ~:.,;~'.~ .< MD FL:- SOLIDS' .TENP:;°F . ANGLE DIRECTION "TVD-- .-~;SEcTION'. :~i, : -."COORDINATES'-- DLS .i :.~- .;.~.~ ~i ~;t~_.*,~,.."..~?:L*.~;F<'..~:~.~ ,-~..c:~f~.,~; ~:~ .... ~i--'~.-~;~ ~j~~'~ ~'~4-<~;~;~t'~;;;:._-,~ ~ _,.' :--- . ' : - :-'-7H056 Alaska Oil & Gas Cons. Comm~,ssior~ Sohio Daily Drilling Report -- PBU November 21, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-11-13) AFE # 120375 0600 Depth' ' Day' -3 24-Hour Ftg' O' Water Used' 4 Current Operation' Rigging up rig. Rigging up on D-29. MUD TYPE- WT: VIS: PV- YP- FL' SOLIDS: TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H- Sohio Daily Drilling Report -- PBU ~Jovember 22, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 0600 Depth' 227' Day' -4 24-Hour Ftg' ll9' Water Used' 9 Current Operation' Drilling 17-1/2" hole. Accepted rig at 2000 h'rs' 11/21/85. Spud D-29 at 2230 hrs 11/21/85. Drilling at 227 ft' MUD TYPE- WT'8.6 VIS:300 PV'18 YP-54 FL'lO SOLIDS'2.5 TEMP' °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H- Sohio Daily Drilling Report -- PBU November 23, 19~5 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 0600 Depth: 2700' Day' 2 24-Hour Ftg: 2473' Water Used: 21 Current Operation: CBU~ Drilled to 540'j Trip for bitj Drilled to 1445'j Trip for bitJ Drilled to 2700" Short trip' MUD TYPE- WT:9.1 VIS:90 PV:IO YP'38 FL:23 SOLIDS:5 TEMP' °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H: Sohio Daily Drilling Report -- PBU November 24. 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 0600 Depth' 2700' Day: 3 24-Hour Ftg: ' Water Used: 14 Current Operation: Nipple Up BOP's, CBU' POH, Ran 13-3/8" casing to 2667' and cemented with 1687 sks Permafrost E and 500 sks Pemafrost. ND 20" riser and NU wellhead and BOPE. MUD TYPE- WT: VIS- PV- YP' FL- SOLIDS: TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS J , 0576H' Sohio Daily Drilling Report -- PBU November 25. 1985 at 0600 hours Rig: Nabors 18-E Well: D-29 (14-13-Il-13) AFE # 120375 0600 Depth: 3100' Day: 4 24-Hour Ftg: 400' Water Used: 14 Current Operation: Drilling 12-1/4" hole, Test BOPE. RIH with 12-1/4" bit and cleaned out cement and FS and drilled 10' new hole~ Ran LOT to '7 psi/ft~ Drilling at 3100'i MUD TYPE- WT:8.8 VIS:34 PV:4 YP:3 FL:iS SOLIDS:3.5 TEMP:68°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H: Rig: Nabors 18-E Well: D-29 (14-13-11-13) Sohio Daily Drilling Report -- PBU November 26, 1985 at 0600 hours AFE # 120375 0600 Depth: 3741' Day: 5 24-Hour Ftg: 641' Water Used: 10 Current Operation: Drilling 12-1/4 hole Drilled to 3400' CBUl POH. RIH with Dynadrilll Directionally drilled to 3722'. Trip for BHA. Drilling at 3741'. MUD TYPE- WT:9.0 VIS:35 PV:3 YP:4 FL:18.0 SOLIDS:5 TEMP:60°F SURVEY MD ANGLE DIRECTION TVD SECTION- COORDINATES 1 3524 511° N4013"E 3524 5 N4 E4 2 3657 10" N28"E 3656 23 N19 El3 DL 421 0576H: Sohio Daily Drilling Report -- PBU November 27, 1985 at 0600 hours Rig: Nabors 18-E Well: D-29 (14-13-11-13) AFE # 120375 0600 Depth: 5380' Day: 6 24-Hour Ftg: 1639' Water Used: 600 Current Operation: PU DiD. Drilled to 4712'. Trip for bit and BHA Drilled to 5380'. POH for Dynadrill~ MUD TYPE- WT:9.3 VIS:35 PV:4 YP:5 FL:10 SOLIDS:7.2 TEMP:68°°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES 3 3790 127° N26.9°E 3787 49 42 25 5 4038 1817" N30.1"E 4025 115 100 58 7 4287 24.6~ N34.8OE 4256 206 177 107 9 4536 28.8~ N41OE 4479 318 265 176 11 5152 34.6" N44.5°E 4997 648 510 401 DL 226 2.6 2.0 0.6 0576H: Sohin Daily Drilling Peport -- PBU November 28, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-11-13) AFE # 120375 Current Operation- Drilling. Dynadri 11 ed 6240'. 0600 Depth- 6240' Day' 7 24-Hour Ftg' 860' Water Used' 4 from 5380' to 5582'~ Tri-p---f~r BHA.- - . Dri 11 i ng at MUD TYPE- WT:9.3 VIS-34 PV-5 YP-4 FL'8.5 SOLIDS-7.5 TEMP-69°F SURVEY MD ANGLE DIRECTION TVD SECTION 13 551 7 36.9 N33.3E 5292 860 14 5594 36.9 N28.3E 5354 907 15 6057 37.7 N49.7E 5722 1186 COORDINATES DLS 669. 544 3.59 709 568 3.90 954 704 O. 25 0576H- Rig' Nabors 18-E Well' D-29 Il4-13-11-13) Sohio Daily Drilling Report -- PBU November 29, 1985 at 0600 hours AFE # 120375 0600 Depth' 7270' Day' 8 24-Hour Ftg' 1030' %~ater Used' 600 Current Operation' Drilling. Drilled to 6479'. Trip for bit. Drilling at 7270'~ o _ MUD TYPE- WT'9.6 VIS'39 PV:8 YP'6 FL'5.5 SOLIDS:9.8 TEMP'83°F SURVEY MD ANGLE DIRECTION TVD SECTION 16 6419 37.3 N29.7E ' 6009 1405 1 7 6926 35.2 N30.1 E 6418 .... 1703 COORDI NATES 1146 1406 813 962 0576H' DLS O.11 0.42 ~v Sohio Daily Drilling Report -- PRIJ November 30, 1985 at 0600 hot,rs Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 Current Operation- RIH. Drilled bit. 0600 Depth: 8111' Day: 9 24-Hour Ftg: 841' Water Used: 950 to 7396'. Trip for -bit. Drilt-ed -to ~ . MUD TYPE- WT'9.8 VIS:38 PV'IO YP'6 FL:5.2 SOLIDS'Il.3 8111 '. Trip for TEMP'87°F SURVEY MD ANGLE 18 7335 31.9 1 9 7644 3'1,. 1 20 8050 33.8 DIRECTION TVD N29E 6759 M32.6E 7027 N37.3E 7365 SECTION .... 1928 2089 2307 COORDI)~TES 1602 1741 1919 1074 1156 1282 DLS 0.82 0.66 0.96 0576H- Alaska 0,, ~ uu.s [;,'.~]s, OommJss)ori Anchor2.~8 Sohio Daily Drilling Report -- PBU December 1, 1985 at 0600 hours Rig: Nabors 18-E Well: D-29 (14-13-Il-13) AFE # 120375 0600 Depth: 8985' Day: l0 24-Hour Ftg: 874' Water Used: 150 Current Operation: Drilling. Drilling at 8985'. MUD TYPE- WT:9.7 VIS:39 PV:8 YP:5 FL:4.8 SOLIDS:lO.6 TEMP:87°F SURVEY MD ANGLE .' . DIRECTION TVD SECTION COORDI)~TES DLS 21 851 3 33 N36.8E · 7-751 2562 2122 1437 0.21 0576H: Sohio Daily Drilling Report -- PBU December 2, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-11-13) AFE # 120375 0600 Depth' 9400' Day' 11 24-Hour Ftg' 415' Water Used' 1350 Current Operation' POH. Drilled to 9113'. Trip for bit. DrJlle-d to 9400'. Short trip. CBU. Lost 225 bbls mud. Spot LCM.- -POH. MUD TYPE- WT'9.8 VIS:39 PV:8 YP:9 FL:4.5 SOLIDS'Il.3 TEMP:91°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES 22 9011 30,3 N38.2E 8175 .... 2823 2329 1596 DLS 0.56 0576H' Sohio Daily Drilling Report -- PBU December 3, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 il4-13-11-13) AFE # 120375 -m 0600 Depth: 9400' Day: 12 24-Hour Ftg: O' Water Used: 600 Current Operation' Ream and Wash. POH. LD collars. RIH to 9300' and plug bit. -POH. Change bit. RIH and ream from 9250' to 9400" Lost 85 bbls. mud. Spot LCM pill. MUD TYPE- WT:9.7 VIS'38 PV-7 YP'9 FL'5 SOLIDS'lO.5 TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION · .~ ..... ,. ~ . .~-. : · ~ 'COORDINATES DLS 0576H' Sohio Daily Drilling Report -- PBU December 4, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 0600 Depth' 9400' Day' 13 24-Hour Ftg' O' Water Used: 3 Current Operation' Pump cement 9-5/8" casing. · Wash and ream to 9400' Spotted LCM pill and Observed well to be stable. POH. Ran. 9]5/8" casing2 Cementing in progress. MUD TYPE- W1:9.7 VIS:45 PV:12 YP:8 FL-9.8 SOLIDS:lO IEMP:70°F SURVEY MD ANGLE DIRECTION TVD SECTION~ ~_ COORDINATES DLS , . . . ~ . 05'76H:' . o_ Sohio Daily Drilling Report -- PBU December 5, 1985 at 0600 hours Rig: Nabors 18-E Well' D-29 (14-13-11-13) AFE # 120375 0600 Depth: 9513' Day: 14 24-Hour Ftg: ll3' Water Used: 8 Current Operation' Drilling 8-1/2" hole. Cemented 9-5/8" casing with 400 sks Class G with 8% Gel and 200 sks Class G. Installed and tested packoff. Test BOPE. RIH with 8-1/2" bit and drilled cement from FC to 9317'. Test casing to 3000 psi. Drilling at 9513'J MUD TYPE- WT-8.9 VIS:38 PV:6 YP:5 FL' SOLIDS'4 TEMP-?2°F ANGLE ";DIRECTION-'''':~ SECTION ~'~ : ::COORDINATES. - :DLS · · 0576H' Sohio Daily Drilling Report -- PBU December 6, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-11-13) AFE # 120375 0600 Depth' 10;170' Day' 15 24-Hour Ftg' 657' Water Used' 6 Current Operation' Making short trip. Drilled 8-1/2" hole to lO,170" Short trip. MUD TYPE- WT:8.9 VIS:38 PV'6 YP:4 FL:6J8 SOLIDS'4 TEMP:79°F SURVEY MD ANGLE DIRECTION TVD SECTION , COORDINATES DLS 0576H: Rig' Nabors 18-E Well' D-29 Il4-13-11-13) Sohio Daily Drilling Report -- PBU December 7, 1985 at 0600 hours AFE # 120375 0600 Depth' lO,170' Day' 16 24-Hour Ftg: O' Water Used- 2 Current Operation' RIH with 7" liner. Short trip. CBU. Ran open hole logs. Made wi per trip. Rig to run 7" liner. MUD TYPE- WT:8.9 VIS'41 PV'6 YP'5 FL'6.4 SOLIDS'4 TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H: Sohio Daily Drilling Report -- PBU December 8, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 (14-13-Il-13) AFE # 120375 0600 Depth' 10,170' Day' 17 24-Hour Ftg' O' Water Used' 2 Current Operation- POH. Ran 7" liner with shoe at 10,165' and liner hanger at 9100' Cemented with 261 sks Class G with 5% KCL. POH. LD DP. RI~ wi th 8-1/2" bit and cleaned out cement from 8790' to TOL at 9102'. CBU. POH. MUD TYPE- WT'9.1 VIS:38 PV:5 YP:4 FL:6.0 SOLIDS:5.5 TEMP-°F SURVEY MD ANGLE. DIRECTION TVD SECTION COORDINATES DLS 0576H- Anohorag~ · Sohio Daily Drilling Report -- PBU December 9, 1985 at 0600 hours Rig' Nabors 18-E Well' D-29 ~14-13-11-13) AFE # 120375 0600 Depth' lO,121' Day' 18 24-Hour Ftg' O' Water Used- 4 Current Operation' POH laying down DP. POH. LD HWDP. RIH with 6" bit and clean out cement to TOL. Test liner lap to. 3000 psi. Drill cement and LC from 10,083' to lO,121'. CBU. Displace well to 9.6 NaCl. Test liner to 3000 psi. MUD TYPE- WT:9.6 VIS'NaC1 PV- YP- FL' SOLIDS: TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H- Sohio Daily Drilling Report -- PBU December lO. 1985 at 0600 hours Rig: Nabors 18-E Well: D-29 (14-13-Il-13) AFE # 120375 0600 Depth: lO,121' Day: 19 24-Hour Ftg: O' Water Used: 2 Current Operation: RIH with Otis slickline. POH. Ran 4-1/2" tubing wi th 7 GLM's. tree to 5000 psi. Set packer and test. ND BOPE. NU and test MUD TYPE- WT:9,6 VIS: PV: YP: FL: SOLIDS: TEMP:°F SURVEY MD ANGLE DIRECTION 'TVD SECTION COORDINATES- DLS , 0576H: Sohio Daily Drilling Report -- PBU December ll, 1985 at 0600 hours Rig: Nabors 18-E Well- D-29 (14-13-11-13) AFE # 120375 0600 Depth- lO,121' Day: 20 24-Hour Ftg' O' Water Used: 300 Current Operation: Moving to D-24. Displaced tubing to diesel. Downsqueezed annulus with 300 sks Permafrost cement and 125 bbls Arctic Pack. Released rig from D-29 at 1530 hrs. 12/10/85. - MUD TYPE- WT: VIS: PV- YP- FL- SOLIDS: TEMP-°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS ., 0576H' I TELECO 1 Te~eco Oilfield 6116 Nielson Way  Anchorage, AK 99502 (907) 562-2646 December 5, 1985 of Alaska Inc. JOB 453 TAK SOHIO WELL: D-29 PRUDHOE BAY NABORS 18E Please find attached a copy of the computer calculated MWD directional surveys for the above mentioned well. We at Teleco appreciate this opportunity to provide Service to Sohio. Teleco is committed to providing the highest quality of service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Pat Havard Field Service Supervisor PH/el Enclosures A!aska 0i! a Gas C:c.:.as. Comini.ssior~ A ~lJrr~l~'l' COMPANY TELECO OILFIELD SERVICES JOB a53 SURVEY ~CALCULATIONS Date Page 11/25/85 'Company: SOHIO ,Well: D~29 Location:. PRUDHOE BAY · , TELECO Job .~! Grid Correction: Magnetic Declination: Total Correction: ?ro~osed DireCtion: -a5.3 TAK / 0.00 degrees 31.50 degrees 31.50 degrees 35.10 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE '" VERTICAL .COORDINATES CLOSURE DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST' ANGLE feet deg deg deg/min feet feet - feet feet feet deg 5.1 10.0 12'.7 .15.5 18.7 DOG LEG SEVERITY deg/100 ' TIE-IN N "0 18 E 3,00.00 TFL ECO MWD 0.0 aO.3 0,00', .OON "]'"'i' O.OOE 0.00 N 90.000E 0.000 ~0.3 28.0 26.9 29.7 30.8~ ,,,. .. 13.35E 5 22,9 2 ..~.. ~.~ '.'18.63N . ,.'. . ::'~,.? ,8.86 al .86N 25 .a2E 79'.09 115.12 68.66N 39.85E 99",90N. 58.07 E 5.51 22.92 a8.97 79.39 115.5.5 N a0.300E N 35.627E N 31.268E N 30.130E N 30. 168E a.113 3.859 2.036 2.305 2.615 ':3~00,00 . 352" .00 3 57.00 3790.00 ., ',391.5.00 ~038.00 N aO 18 E 3523.83 N 28 00 E 3655.6a , . N 26 5a E 3786.03 N 29 a2 E 3907.25 N 30 a8 E ~02,.80 · TELECO Job # U53 TAK / 11/25/85 Page 2 . MEAS DIRECTION TRUE VERTICAL' cOORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION ..' N/S, ~,~. E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet · feet ": feet feet deg deg/100' **************************************************************************************************** · ~162.00 21.~ 31.9 N 31 5n E ~1~1.27 157.5~ 136.20N ~'~i.i80.18E 158.05 N 30.~86E 2. 198 ~'~287.00 2~.6 3~.3 N 3~ 18 E ~256.32 206.3a. 177.11N :106.85E 206.85 N 31.103E 2.667 : uui2 O0 26.6 38 2 N 38 12 E ~369.0~ 260.33 220.66N . . .78E 260.67 N 32.168E 2.092 ., r-, 4536.00 28.8 41.7 N ~1 n2 E ~78.82 317.75 264.83N 175'.78E 317.86 N 33.57U, E 2.206 ., ~661.00 32.1 ~1.3 N,~I 18 E 4586.57 380.70 312.27N 217.75E 380.70 N 34.889E 2.6~5 5152.00 3U..6 44.5 N ~4 30 E ~996.68 6~8.07 509.97N 401.~6E 6~9.03 'N 38.211E 0.622 5301.00 36.0 46.3 N ~6 18 E 51!8.28 732.78 570.~2N ~62.76E 734.52 N 39.051E 1.170 5517.00 36.,9 33.3 N 33 18 E 5292.03 860.40 668.80N. 5~4.73E 862.57 N 39.163E 3.595 5594.00 ~'057.00 6Ol,9.00 ! 6926.00 ?335.00 :764t,t .00 'i8050.00 :851:3.oo 9011.00 36.9 28.3 N 28 18 E 5353.60 906.49 708.50N 568.~0E 908.32 N 38.739E 3.898 37.7 29.7 N 29 42 E 5721.90 1185.46 953.88N 704.~2E 1185.79 N 36.a45E 0.252 37.3 29.7 N 29 ~2 E 6009.10,_ la04.85 11a5.28N 813.62E la04.87 N 35.391E 0.110 35.2 30.1 N 30 06 E 6417.95 1703.40 1405.14N ~'63.08E 1703.51 N 3a.427E 0.417 ,, 31.9' 29.0 N 29 O0 E 6758.76 1928.34 1601,75N 1.07a.54E 1928.80 N 33.856E 0.820 31;1 32.6 N 32 36 E 7022.22 2089.31 17a. 0.41N 1157.20E 2090.01 N 33.620E 0.661 33.8 37.8 N 37 ~8 E 736~.80 230?'.06 1918';3~N::.,...}282,72E 2307.68 N 33.769E 0.956 30..3 38.2 N 38 12 E 8175.23 2822.80 2328'.37N !596.23E 2822.99 N 3~.~33E 0.562 ,TELECO Job ~ ME~ DEPTH INCL 9339.00 ~.53 TAK / · DIRECTION AZIMUTH BEARING deg deg/min TRUE VERT DEPTH feet 11/25/85 VERTICAL COORDINATES SECTION N/S 'FYW feet feet feet Page CLOSURE DIST ANGLE "feet deg DOG LEG SEVERITY deg/100' 27.3 ~1.0 N ~1 00 E 8462.62 2980.29 2~50.10N 1696.93E 2980.36 N 3~.706E 1.003 3600 3200 2800 2400 2000 600 1200 BO0 4OO TELECO 0 i 1 ~ i ~ 1 d S~rv i c~s PLAN ViEW EAST (~t) 0 400 800 1200 1600 2000 2400 TELECO Oi l~iald S~rvicas VERTICAL PROJECTION 0 3000 4000 5000 ~ 6000 7000 8000 9000 10000 11000 12000 1000 2000 BO00 4000 5000 6000 ~S.~~o o o~:~ _~.... sc:HJ_o ~e's ~s,s o~',~ -- i D_~2~ .I ..... . ~ ,~,, ,~_~ ,,,_ ~_ ~ N~B~R.~ lee . . __~__ __~ ~ SC:At ~,, , , ~ I , ~ .............. L ' .... , . . ,, , ~ ~ .8};13 ' 3:] k~ cn,~,.- ~,n ~ n~: , . ..... 1- i ' -- -- ' - ' -, t 1 ... . _: _ . .~. r .. ~=. ........ , - .__ ' ~ ' t VERTICAL SECTION January 2. 1986 Mr. Michael D. Martin Sohio Alaska Petroleum Comoanv Pouch 6-612 Anchorage, Alaska 99502 Re: Our BOSS Gyroscopic SurveyP Job No. AK-BO-50125 Well: D-29 (Sec.25 TllN' R15E) Prudhoe Bay, Alaska Survey Date: December 14, 1985 Operator: E. Sel lets Mr. Martin: Please find enclosed the "Original" and sixteen (16) copies of our BOSS Gyroscopic Survey on the above well. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard District Manager Enclosures NL Sperry-Sun/NL Industries, Inc. P.O. Box 190207,.Anchorage, Alaska 99519-0207, Tel. (907) 522-1737 SOHIO ALASKA F'ETROLEUM F:O. I='RUDHOE BAY ALASI<A SRERRY-SUN WELL- SURVEY I NG-. E:O~dRAN¥ __ VERTICAL SECTION CALCI_ILATED ALONG CLO'.--;URE ANCHORAGE ALA'.E:KA COMPUTAT_T ON_DA_TE DEF:EMBER 16, 1985 DATE OF SURVEY DECEMBER 14, 1985 BOSS__GYROSCORI L-: '._--;LIRVEY ,..IFIB NLIMBER AK-BO-5012.:'-: ' ~'.i.. ' ' '- '. ' KELLY BU'.-_-:HINC4 ELEV. = F'T':'::.:i~ii; I]E'E~T[-IIR_--F. ::;F-II FA'::; "" :.' " ..,....i IEBUE__ '._::UB.-_..SEA . . F':OURSE MEA'.3URED VERT I F:AL VERT I C:AL I NCL I NAT I ON DEPTH I]EF"I'I4 DEF'TH DEG M I N F._~U '.'-~.. DOG-LEA RECT I ON SEVER I TY ] ', -,-. . . Et: REE.=, 1lEG/1 O0 _7[A_TA L REI-:TANGULAR COORDINATES i. VERTI NORTH/SOUTH EAST/WEST" SECT I ON · , , '!700 :::'.:,? 9 oF; ,-'",,- , ,..-,~.;~ 1 1 1 'S 4{2) .:,,""':~:, E () 21 6 '."'~--, '::' .-., ..... · - u , " " " "'~"'- '--' .,';- · ~.. J, ~-.' '~.' ~';:.~. 1,":'00 ':~;9'..-.,, 94 '?'.'.":.? 1 () ' 0' .'H,=' 10 E' 0 26 7, 4 I" S' ': :'"4.06: E::::'.::i::'..::i:;?:!!~;ii~!:;iiii!":i::i;i!:.:i.:::::~'.:~~ · . , ~ , ~. ,il . o~ ,,..,11 ~, ii., ,...............';.............-. -., .....; ... .1 .1 (')(') 1 (')':>'::' c,,,'.:: .1 A"::":,' (')'::;, C) 4.'--' .'..A.' ' 5(') E: (,)_ .-.,c,, . c,. (-)-? ,::; Pi '" '":<~' ': "' , ............. ............................................... :...:..._....=..... .......................... ,._...,, .... ,. ...................... , .... -..,_, ............ :=._._ZZ,_= ......., .,,.,,...,,,,~.__ .................. ,,,,,..,,....,._,,.,_..~. :,Z E,: :'~:3 1. :2: ('),:") 11. 99 ..... , .., '::¢.,~. 1. 1':.:"::> 0:::: O. "::'":' S 84 , :30. Ii-- 0 . 1':;' 8, :2(".)S 6 4.:3 E -'-" /:','=',:, .... ~ ..... '..'~ '...! · . ii .' ii .1. 30 () 19,:;, 9 '::;,'2 :1. ':.:"::"::;' ('} :::':() 24 Iq '":'"" :::: 9 .... -.":, .............. :.,,:: ..... E . (") .1.'7 ::?, 24 S 7 31 E .'-, 16 __ 1400 1 ...":: '::>'::>...., 91. 1:::";":;>,=,~..._._. 07.. . .... L}____.;t. ~5i__ :,~__=,t~,_;:.,~'::' '-.':, ,:',,..-, ~u . :l. '-"? 4,: .'.. 07 .1, S 148, 5O (), (.'.)7 '=r,,::, o7 :'~:) '--' "-'~" , =":'"::':'::' '-' ........ ,m, 0 L. 0.1,~:. () ", -, '.' .",~ ~) ~) , /' ", 8;7!1. .... 1 ............ ~zL.,...._.._._~~...__._= ......................... ,~,_.~ () 19.. L:.'; 24. · 19. E 0 ,, 12 9,. , /-:.3_ ~F; 8 .9'7 E -.,::'-'. 31 0 27 ':' 1 6,F) W 0 '-"-' 10 ,, :':.':4 S 9 ' '-' Oc, E -2 77;! . ..,:;..~ . , , 0 _.._...'~ ...... ', .'i_ 4:2.,. 12 . W, ...... .~.,, "~ "'"" ....'-'"' .~, ..:,.,:;, ....... ~.!l,._,-.~,-;;. '.ii!;. · ':_1. O0 ";, n ,::;' ,:;, ,.T,,F) 2,02'~.'('),"-, .'. i 'i:::' 'F)""" '::~ ":'. ':'-"": "".:',,' -' ':' '=:C) c" ..' .~, .... . ,. ~ .. ~ . - . , . · ~ ,' . ,' ..:,4 :: ..... :~.:.., ,: .... W F) 43 . :1. 1 , 4.:3 ~::, ,.,, ,... 2 ';:' ¢') ,F) '"':' 1 ':>':;' 9,r') 21 '- '- 06 :: ,[.".) i.: :::.: 1/..:,. .......... . ..... ::~ ::,'. F.; ::."'-.,.~,'":./- o ~..{ ' "0', :30 i '":' 11 '" '" /. '"" · ' ...... ,,:,-~.~ , -' ~'. . .,:;.. <5 ,.'::,,, %",2,:. 24,:".)0 :...-.': :3 i? i;' . 90 'L:"_-- 2'? . ()E:' . (") 1 .".'5 'S :'::. 5C) E (2), 13 1:3. {")!15 '.iii; 8. '7./:, E -!""]. 12 ~:i..:." .... ,, ,-,,..., ,::. _5 25()0 ,::4. :., ::., '.:.';'(') 242'P, ()6 (") 1P] _1. 1 50 E (") (]4. 1:3 .' 4F::S :'-": '-"-' ..... . .. . ,22,.,- E 2600 25'i;:'i~ ?0" 2."~?F,'.06' ,. 0 .1~ :3 20. 0 F ("} 0".=; .1:'::,,C.>:':: ::.'; ,'g_' ':.'.'~ F: " ..................... ~ . ,. _ ....... ~ .... · .. .....-, ..... ~ , ..... ,.,... .... ,~ ~- .... f. ~ ,, ~. ....... . .... .4,.%. _.~.....z,,.....,. ,.. . ,..._..,.~: ._~.,,~. , ~ ..... -. ,~ ..... · 'r:, .'? ~ ,'..1 ,"' ,:',Q .~'~ ."),:, .; "','.r; '..U.. '- *2 ':; :: ' ,- .{';..;';:::':'"':::'.;::. "'?~, '' .-',. ,-- ' ; ""'"., ia .~..i:..:.:,:"'.'. ...: :.. 700 ..:. 6 ..,' ,-.', o ? . .....,~ 6.,~ ...", (.),j. : : ... :.: 0 .12 ~: ~....:.:...::~,'.,:.: 6, :~: 1' ::: ..: :. 14,, .4...-"-,. c? .:. ::¢~'", :~: ;. ':: ,*~,-, ' ' .-,'-' -, .... ,,- ' .'", .-,,") ' ~'. '!;: '; :' .'..-", ' ."': i: :.:. ~ .'.:.' ":':'":":'";': ": ';" ";. '.: '" ..;-, ~'" ::. ::;' ,", ," ': ''" : '" ":".: ":::.:.i!'.'~;'~!'.'.!~.>::~".".¢:'::":'~.:~;'.;'::';:':'": %': ::' .':' "~:~.~ z.¢,O0 ,:./~Y. ,-,~ ~7..' .-..()., ():'....'...~7 ...'.. ..'. ~'.. ::1.~.,;/-,() E'...".....'..'.........'.....'0~' ',: ':~ .1., ,. A,.-, .-, .,.,. · · ~ · ~ · ' '~ , ,' ",;; : - '"' '-..' ·", ' . * , '- ,' ~ ~ . ,.. ~ ,', .~ ,,. -,, ?;,.;..,,.',,;,.'¢,',,,;,',> v, ',, ,,y.,,.,' ,, ,m, ~., ,,,; , ' -',~-,,- ,- ,'-,,- ' ."',,-,--,,- '" ~:-':'" : "; !' "' ,'", -; .'"" ":" ': - --":':'"" '"'' ~:' "- r~- ,- ' :''' , . · .,.. ', :~,~' ' "::' --]'(lC) ,-,-, -,~ -,' - ,..., -,~ .,::,-,.... -,'. ( ) , . ' (.) r, -, ~ J ( ) ' ..... , .'t ' I , '"/ , .5 '-,' ;~ ':': ~ .... ._~--.,'.'....u.~ .................... ~..-..--; ..°,......'..,,~,...~'_.~...~~.,-.. ..... .~.%.,.~...=:-_~: ..... .~:.,'~.-- .......~..,..,..,,-.,.,~z~'..~. ...... -..~u~.,.,4.~ ,...~,,.,,.~.~-, : ~=.-~=~.~-~,. ..... , ~~._..,,u..t.~.,,,w.....,~..:m_~.' ' ' .¢ . ~-. ;_ ' ." '.~:.".'.'~'.',,",,'>:.: ?%, .1. 500 :1. 4.99, ? 1 1600 1599, 91 1Z.<!.O. ............ :i,./~ ?$!:.-.$2..1_~..1~2'.2.,..!}.;'7 18 ()("~ 1. '7'.-i)'.-7,91 1729, () 7 :1. 'iP 00 1 ::2:'..7 i.:/,, '.:; 1 1 :.3 :;2'P, () 7 ::2: ,:")(')0 19 'i:':.' i;'. '.::;' 1 1 >22 ~...,_.(~! 7 PRUBHOE BAY ALASKA __ SRERR¥=SUN_. WELL--'-~E¥ I NG C6.m1F_~¥. VERTICAl_ SECTI']N CAI...(_':I. JL. ATED AL. OI',IG C:I...OSI...IRE ANCHnRAGE ALASKA _ COMRUI~]LLOM_BA~F DEC:EMBER 16, 1985 DATE OF :--;I_IRVEY DEC:EMBER 14, 1..8._, BO.c:'-,~yI:;tFI:';F:FIP _1' F: ._~11RVFY .:' _ -- , ::_ - .,~ . ...'......FT:;:;.!!:i!::.iii; MEASURED DEPTH _TRUE SUB-_-SEh]_ _ r:n ~E;E VERTICAL VERTICAL INCLINATION [ EF TH DEPTH DEG M I N I--: 0 I_1R F; E D Ii G, L E G D I RECT I ON SEVER I TY DEC-iREES · DEG/100 I'OTAI, REC:TANC'iI..IL~R COORD;INAT~S .'. NORTH/SOUTH E A E' T/WEL:'T :'.:::':::':i' :::?. ;!.:: __ :30C)0 ol C)O · ~,,-./,.-./,:/ ,::,o.}c:].?,:'/ (')4 (-) 'T.,/-, :3 C)9 ?. 88 :':: c)9,?. () 4 C) 41 :E:l S~'P. :::7 :3129.0:3 0 :38 S 12.69 W (:)·19. S 8 ::::9 W () ":"-:i m ... .. n ,'.... · '.'{; 5. :::'i.-) W O. C,)/: .1. 6.81 S 9. C) 8 E -7."~/3 17.78 ._.,'::' 8 . '.:.>C) E -':',_,. el, 18 ':)":: ':' 8 -': :3:3(]0 3400 :]-:50C) 0 44 O' :2:4 · 21 S l.m, 1c~ W S '--": ::":')E Iq 41.19E .0.15 i %° 4 · ._-.. :3L-,C)(:) :370C) :':: :i.:.: C) C) 3.900 4000 4 _1. 0 0 4. 200 4 3 C)C] 44. (')C) 4177, 29. 4.1 C).. 6.4 ....,':'" 4 :;?/'-, 9. :L 2 4.198.28 4 ':: ~ 'P,. 47 4:2:88 ,,/:. ::F.: 450(} 4/:.:.00 4.7(.'](.'.) 48()C) 4'POC) 500(} 510C) 5:.200 4. 7 C) 5. ::::':'7 4. 6:34.54 4'7:3 ::3.71 4'7:17. F: 7 4.:.'.:.:71 ,. 54.0C) 5450 56C) 0 5700 536C.). 5440 · 36 :31 N 4.5.69 E :l. 1'7 · ':,/. =' ,4 · ..,:, Iq 4.1../:,9 E 4 8./:, %./, _1 . I .L :1..:,. 16 E .z..:, 7.47 :1.,~2'.., 2C.) N .'.. ,z. .-_,.-, · . -~ . :,,..,,,'.,. ,'...,..,,,,&,,,.v..,... ~,,., ~ -i '. ' . v, · ,:...,:, ~, ! 7.. lq . "" " '"'""'"'" '::~''''''''':''''''' '?'-', ---"":', ' .... :....:..i 74., ~..'~.'. E:.. !:!isl..:'.'.',':~:,.'.:;i.:.:.:,:.,.,:¥ '~ ~,, *.~! .'-j,.~,-, ..-,.v h~ .' :. '..'.": ..';:,"t,-. '""T.~ "". ,~"'":'"; '"";,":'"":~",:":~'~'::'"":;"':"'"'", '""~ ~':"~': ,~,- ¢:' .. ,:. -...... ,'~., .: .....,.:...;.::..~ 0.7;~:. ~. 0 ,.';.:.,E;i.:?:%i~i:};i¢~:i::~;i~:;:~?i~::::~:3. ~;:..:!~:~, ' · ':' · *., e" '1 ..... :.,,v.: .... . ,., ,... ,,,..~_ ~ ~ ,.,,,,' .. .,,'.', ' 4.._- 7._..E ....... .,...,: ...... :., ........ ,. 75.,,.. ':'":'~5 (')C.) N '-':":'('~ 9 .._1 .,,,I .... · I · ...- ......'7 E 4:3/...:, 67 :_::74. (:) 1 I,,I 32C). 12 E 4"~ 1,41 : '":;':>"::" 44 N ;:'; 44 27 E '-' ' ............. =, (..) l .' 64 SOHIO ALAF:KA F'ETROLEUM C:O. PRUDHFIE BAY ALASKA SPERRY-L=;LIN WEt_L SLIRVE¥!NG CO!'!PANY ANCHRRAGE ALAs]KA VERTIC:AL SECTIOI'.I ~.-.:ALCI..ILATED ALONG CLOSI._IRE F_:O MEd_I.TAT_ION_O~_TE DECEMBER 16, 1985 DATE OF :::LIRVEY liEF:EMBER 14, lO,'-,~- -- .k .. ~.~.~l BOSS_G~Y_RI-(::;F:OF' lC ~;l IR'VFy JOB NUMBER AK-BI]-501'-.''~' .... .... :. ~'-~ ' KELLY BI_ISHING ELEV, I]PERATOR-E. SE LLEF:c.:; ' MEASLIRED DEF'TH ]'RUE .......... i; IJ. ~L-_~_;E A ............ CDLIF~_:i;E ..... VERT I CAL VERT I CAL_ I NCL I NA'F I UN DEF'I'H DEPI"H DEG Iq I N .... i~;.n~l!R:.--.:E Ii 0 G-L., EO _TC) TA L D I RECT I ON :.:.;EVER I TV REC:TANI31.JLAR COORD I NATES . VERT I CAL · ..'. DEGREES DEG/100 I',IORTH/E OI_ITH EA'.:;T/WEST '"' .:ii:"": SECT I ON '"]~.~ · , , N :3o ....... :10 E 0 07 82::: 91 N 68/z, '-':,,:,'-' E 1071. N 3_ o~. 5: ..... ("~ E C) .1 F;_ 876 . :34 N 717 . ._':: 9, E 11 ,.,':' 1 .70 N :2:1, 0 E __c}... 44 o.-,,-,...~:,:,, 64. N 74:_:,',.:,,:,'-"-' E 11 YZ,-'- ! 0 N :BO.'-'C .. ..... . ..E. ,:, ..) E () 16 9E:O E:C) N 779,60 '. .:.....:':i.' 1 52, 53 ': ' N '-'c. q · :,) 8'i') E. 0,09 1 ')'-'":' '-"" t...:,.~, ,:,,-., N ,: 10 71 1= .:.': ' !7%:.:.::" :1 L'r1'2',:84 . · 0 ' ,'",~" ;¥;3",..:""i::.. .-~ i ~, :':.;, Iq ::~_b_ ,=,-) E. _ 0 ,_OL?... 1 c):::4 9.=; N ~ 1 ~' ' ...... ................ _. ...... , o 1. E . . .,.:.~ ....... 137,:,...1.:, .... N ::: o,/_., () E O. :39 .t 1 :':: 6, 9 :'2 I",1 E: 72, 67 E 14._ ..:,, 1 q '" 9 N F:O../:,9 E 0.29 _1. 1:38, 5:3 N 90:::, 25 E 1492. E:O N''"'..:, o'. 6 () IF 0 .36 12' 39.75 N 9. :'::_ '::,... 60 E 1 ~.~.J._ 1 .96 5 9 0 0 5 5 9 9.21 ._, .... ..:.,:,. :..5:'7 i/:I C) ~C~ [) .... .~.5 6 7 8.71 ':=',¢,0' '"7, 8 7 1 6100 % 7.=;':' :l 1 '=' "" ............. ,/_-,,=, 7. :2_7. 6200 '~"-"-' , .'=7 , o,:,._', 7 51 .. 7 6 6 6 7 6:3 0 0 5 91 7.01 .-,,:,, ::,. 17 6 4 C) 0 .=; '-T,, c)/.,. ,=; 9.=;,,:,, "~, ~- ......... : ........ :: -.-"..:,./:.,L'3' 6._, .)0 6 C.) 76 :1 '::' 60 Fit 5 5:: 4 · i_i . · 660 (') 61 ~/-. 2 (') 6 (')8.=; ':'/- -- -- u .,. ~l ....~ ..I 6 7 ()0 /: '2::3/_-,. 5 4 6 1 6 5. '7 0 :"::7 1,----,'-' :"::7 ';:::3 3 7 29 37 18 ,--i ' '--1 ~-_-"t.~_ -~-._~ ' :'-':7 0 ::::6 4:3 3./..:, :2:2 680C~ 6317.26 6246.4.2 6 'P ¢') f) z --,,-),-', .... · . . ,.':,.:,; ,:,. 50 6 ..:,.:: 7.66 7000 64:::(), :'::4 6409.50 N 31. 0 E N :2:1 ¢¢ · :24 ] E N 31. 0 E 0,5 6 .1. :3 8 9, 5 2 N 1 ' '"'-' o.,._ ,:,. 71 161 7100 ' '~ "', 9'.q . o ._ ./::, ...' .... 64 'i.'? 2 7200 66, 46, :38 65'75 7 :q c) 0 /,, '7 :':: c~. 71 /-,/-, .~19 ................ '--',..% ,2 ..................... .-_ .... -"- .:- ............................ T:_---'_..L'.:..'- -/400 ' '"' 7:3 6744 · e,,z, :15. 7500 69() 1.05 6::::30 7600 69 F.: 6, 39 6915 0 iP 54 ,L'., 7 94 77C.)C~ '78()C~ '7'.P0() 8100' :B300 84()(i 707 _1.. 80 7000. 96 715 6,; 88 7086. () 4 7241.24 7 ;LZ_Q.,._4 0 "7324, 74.07· 749() 75'7:3. 7/_-, 56, 78 70 'q"":' 5(] :":::3 1 :3 :L 58 31 27 31.? 30 31 .'. 31 19 32 3 N '31. () E N,.,'":'1 . 1 CI, E I%1:3(). 5,('~ E N 30., 6'0 E:. N,'.!"..3'li:,:' 19 E:"."'.' N :34.6() E Iq ':'=i :::9 E 4:2 7 ~ ("~ :2, '= '"'' '-' '-' ":' .... ,,:' ..:,.:. ..... _1. N ':":' .60 E 'ii?5 758 ./:,, 11 :3:3 J. 0 N :38 · 69 kS 8500 7Z~l:.fj.,__7~_ 7,/;;./:.,..'.:~f~. ~:2' . 5~: __$1. 8600 782;:4.89 7754. ()5'.i", 32' F;. 70.O. 7 9 ()9 . $ 2 .,, 7 o ,z, ,::,. ,:,': '"'o '., :=',':-.i! 00. .......... :. 7:2'R&., ~2__ _~;~.'.$.[~:~!._ .:" 0.97 14.:.'.::'7.86 N 1052.75 E 0.82 14:35.05 N 1081.1/_-, E :L.09 15:7.:1.20 Iq 1108.,68 E 0.54 '15'76.4:3 Iq I 135.4 . .0~22. 1621·20,N' '~ - 0.68 1708.42 N 1219.:23 E :L. 00 1751. :32 I',1 1249.5/.:-, E 0.70 1969.51 N ()..z,'-' ,..P; 2 ~"~ 1.,:.":' .45 iq 1419. :.5:4 E f.:'.--, 14...,.:,. 68 E · ".,.,; .... .... (.) .r57 2427.01 .-'l ..::4o 1.97 S CIH I 0 A L A S K A F'E T R 0 L E I._11'1 C:l-I. D-29 PRUDHOE BAY ALASKA SE'ERRY=SUN--W~VEY I NG ANCHF~RAGE ALARKA L-:O.htF'LITAT I CiN I-lATE DECEMBER 16, 19:-::5 VERTIE:AL :=;EIZ:TION CALCIJLATED ALONG CLIZn_--;URE DATE OF RLIRVEY DECEMBER 14, lO'q='.~,_._, ~ I]'._:; '...:_; l-4 Y R L-I ::-; 17;I] P I IF: '.:;l ! R V F Y dAB NUMBER AK-BO-501 KE L L Y B LISH I NG EL E V. :. = :: 5 ': 70- 84 .' F T; :?!;:.:ii:il OPELRATOR-E' '.:_;El I _ER'...R .. · T R I_1E S IJ B- :'-:'; E A C t.] I_1R S E MEASI..IRED VERT I CAL FiEF'TH DEF"I'H VERT I CAL I NCL I NAT I ON DEF'TH DEG M I N C 0 LJB :~; E P 0 G-I_ E (".i I]I RECT I ON :--;EVER I TY DEGREES DEG/100 TOTAl RECTANGLILAR COORD I NATES VERT I CAI_: i.'i, NORTH/SOLII'H EA:-';T/WEST. SECT I ON. ::::.::i.: 8900 808 C). 5 2 ::: 009.6::: :3(:) 5:2 ,:~n") C) (")8166. !'34 ""c"-"= ._. 26 ..... ::,., .~-._,. 70 5:(') 91 (} 0 ,-, .-, :.- .-, :-.: ,-, .-. ...... :, 10 ::: 1 ':'":' 26 '>9 · ... . *.,! ..',. ,. _ ,-,..... 9200 8:340.5C) ::~2/-,'-.?. 66 930C) ¢, .-,,'-, ,-,.-, p'i'~ . c,.:., .... 94 ':.',' r (') ~5 . $';'= :.3446, 71 .. 4 J, .. " 17 ._ ._, 101 C)0 914 :.'.::. 6:2 '"-¢.....r) -;', ....-:,, 7 :".3 1 C) 17 C) 5;'2 () 6.4 .,.:, 91:35.6:2 ,.. ~ 7 ':"-' 27 1:3 ' :,37 1 26 4:,7:: I',i 40. lC.) E (:).:.:.:5 :.7_'218, 41 N 1621,:37 E 274.7.39 .._ /'/ N 4.1. 0 E C).64 2:257,16 N 1654,51 E 27'P8.'":'c / q'7 ":"c'~ N 41, 10 E 0 79 .-.,c..,-";z~ 9'2' N 1 ,: .... , ..... E :2:=:4.0,24 '--.* N 42' i0 E N 4:3.19 '! ~:C)9 '""q/".:;, '-'C : :': :'-' ::::::::::::::::::::::::::::::::::: ,:, .) hi. 17.~, 1 ,. 4._,. E .. 4,:. ', 4 ..,C.'.- I, LIo.. · N ;'4:3, O.:EI .,.,.~,,..-, . .~..-.~... ,. -'.-"-- ........ '-" ......... -- . ""(')"'" 75 N 4:3..'.5:'.:) E O. :20 2432. ::5:1 N 1814 .'-27 E ._-..:, ~. · -:, .-:, a/- =; 99 N 1 ,:, 4... 54 E :'q 08 o 07 N 4:3.19 I-- 0,~1 ~-. ............ N 41 89 E 0 L.-:._-,(. 1 21 .-,.-, .-q.-) -).-., ,.:,.:,..... , (. HL R I Z ONTAL D I ~:,F L..A.:EMEI',IT = 6 'M.'IN. EAST MD THE IZ:ALI]:I_IL_A_T..I._CIN F'RI ._ .C:REFLRY=SUhLWELJ___SURVEY ! N,] RnMF'~NY ANCHORAGE ALAE;KA :z;OHIL] ALASKA F'ETRCILEI_,IM F:O. __ D :]--" '-.-' PRUDHOE BAY ALASKA C OldE'l I__T~tI~ ~LTE _ DECEMBER 16, I985 DATE OF SURVEY DECEMBER 14, 1985 __ ' - ='3 --,'--', :i--.' .. .lAB NLIMBER AK-BU-._,(. 1..'._-, : "... ..... I<ELLY BUE;HING ELEV. = '"'~:'0':841 FT:':':i":!)!i] ;, OE'ER~TOR-E. SELLER'.E: ' I NTE:RF'OLA'I'EL] VALUES FOR EVEN l(:x)c~ FEET OF MEASI.JRED DEF'TH TRUE MEASURED VERT I C:AL DEPT._H_. SI_lB-SEA TOTAL VERTI F:AL. RECTANGLILAR COORD I NATES [.-!EE:TP! ......... ~E!BIH Z_.'~;i~H Tlq__ EPL%TZBEST MD-TVD [,.I.EE_E R.E: INJ !-.:F._ ..... VERT I CAL CnRR[--C.T]~ 0 0.00 .1. 000 999.94 -70.84 0.00 0.00 92'.:.~ ~ .!.~. 7.41_~i: Z~, 0./:, E 192';?. 07 I0.85 S 8..97 E 2929.04 16.81 S '.-?. 08 E. . . :3 91.~.... 2 ~_ ._,~_4..._~ ~.. 60../:, 0 F 4 8 0 :l. 15 41 :'4.2:3 Iq :'::5 9.2 0 E 5607.87 876. :34 N 717.39 E 7'" F, ~-: 94 1 .o..-, o..3 . ~,o,:,... 1 N ':..'! ',:.:::,, 1'314.66 E .. ,_ .7/~ ........ . ;."," ;,'...!..".: : ~' 'i ,-,no=. 70 ~'"'.=,'~: .1. ~, N .1654. ~ 1 E ,:3 ~ ;'...l ~,~ ~ .,.. ! .... ~'.~<:~:_2~J?Z 25.~. '7~L_N 1962 . ~6_ E 91...,"-" ....'=i. 62 ~.':,/-_, ...p]__'7.4. 4 N 2010.07 E 2000 1999.91 3000 :2999. ','3,8 .4000 ..... 5 ('~ 0 0 4 8'71.99 6,000 56'7E:. 71 7_000 8000 7324.78 'i:~000 8166.54 1000.0 ........ 2.~i...~:i_ 10 _1. 70 92 () 6.46 675.22 ..'" 155.57:. : '-.' 833.46 158','24 ~_4:A.. 19..__ 112.72 'F.'6,:.~-':. 54 17. :Z-:5 THE CAL~LJI.._.~:.!.O!'.]_E":BOGEE!UBE'._.--;~_BBE BA~.LON THE..U.SE OF_ THBEE_D~]E.5]~.E!B]~Ld:"~.D.I!JG;. OF C:URVATL.~RE METHOD. . SOHIO ALAL::KA PETROLELIM CO. PRLIDI-IOE BAY ALAF;KA F;F. LF__RRY_=SLIhI_.WEL. L SURVEY ! NG COMPANY ANE:HORAt-..iE ALAF:KA C: ~..-.I ~I F_qJ_T_J~.T___ZJE!~ E DEF:EMBER 16, 19:-':5 ".)='AGE.{/-,_ .... DATF OF SLIRVEY DECEMBER 14, 1985 .JOB NLIMBER AK-BO-501~'~ · , ~.,-.,::,:.::::.; :..J:':.<:: , .;. KELLY I,-' BLoHINL, ELEV 70.'84 FT OPERATOR-E. L:;ELLERS.' '. ::" I NTERF'OLATED VALUES FOR EVEN 1(')(.') FEET OF SLIB-SEA DEF'TH MEASUREE~ DEF' ]'H ]'RUE VERT I CAL r~EF'TH :---; L.I B- S E A T 0 T A I_ VERT I CAL RECTANGLILAF~ COORD I NATES MI]-TVD DEF'TH NORTH/SOIJTFi EAST/WEST D I FFERENCE VERT I CAL , · CORRECTION '" (:) 0.00 -'70.84 '70 70. 84 (). ()() 17 0 1. '7 (:). L=: 4 10 (]. 2 7 0 2 7 0 ,, 8 4. 2 0 0. :370 ::-: '7 (). 84 .:,"' (.:]'0, 4 7 0 4- 7 0.8 4 4 0 0. 5 7 0 5 7 0. F:: 4 5 0 0. 670 670.84 600. · 770 770.84 700 :' . ':: :~7 .) '' '.070 ',4. 00 00 (") 0 0C) 00 ()C) 0.00 C). C) C.) C). C) 0 0. C)9 S 0.05 N 0.00 c)_. ~._ 1 .::,'-' C). 27 W . C). 00 () ":' (). 00 l-~lI 1 i'", . c,, ('~. 46:' W . 1 ..14 .~'-" ...... ' n" 0.~0 _1. 44 F; 0.'-"'-' ., . . o.:, W 0.00 2. :'-':7 S o.38 W 0.01 ,:3.60 S 0.60 E 0,0:2. e ':" s : ...::.: :'::: u' . 1070 1170 i..27() 1 :':: 70 .1.47¢) ' 1570 167 C) 1770 ]. c) 70. ::34. 1 () (")0.00 i I'-I "~/ , i . 117C) ,::, [ 11 C) 0 (')0 1:370.84 ! 30(:). 00 1470· 84 .':.-1'400,.:00 . .1. 670 .. :::i: 416 C) 0.00 177C). 84 17C)0.00 7.94 ..,'::' ._'".';. C)0. E () . c)7. ,=,.'-' 17.:..':' 6 .1 ':.:¢. E C) . C)8 0 · 'C)9 ",:,;": .. 0 ', 0? 9 16 c. o ....., ,=,. 62 E ().. 09 ..... :, :F:. 90 E! C).09 SOHIO ALAF;KA I:'ETROLEI_IM CO. ____Ii - PRUDHOE BAY ALASKA S;E'ERFL¥=.'_:;LIN_W~UF'Y ? Nt_'~ CONF~AN¥ ANCHORAGE ALA:_:;KA __ ____C.' 0 ME~LTA ~_I ON_ 1] A T F DECEMBER 16, 1985 DATE F~F SURVEY DECEMBER 14, 1985 ,_IF~B NJMBER AK-BO-501';'3 KELLY BLIF;HING ELEV. = _OE' -Ei~ATOR-E. E;ELLERS: 70, :34 FT'" I NTERF'OLA]'ED ...... VALI...IES FOR EVEN lC)O FEET OF '-' I:.LB-._'::EA DEF'TH. MEASURED ~]TH. ]"RUE SUB-SEA VERT I CAL VER"F I CAL DEE'_I][-[ .........DF.J:_'T H TOTAL RECTANGLILAR COORD I NATES MD-TVD , VERT I CAI_ C:DF~~N 1870 ]. 970 2070 2170 2270 :2 ::: 70 247('~ 2570 1870 '-'4 . . ,:, 1 :--:c) 0. c)(23 10 11 _;I._770. :.-]:4 .1./.?.(j'L(:I~_C2(!._ ;l, !), Z.~_.~_ . 2070 84 '.--'{] ('){] {')0 11 ,, 1 F; '=' · # .~ ....., _ ... · .' .,:. 7 .), ,::, 4 ...-- z. C){..), C) 0 1 ":' 4 :':: ':' .................................. .t,... Il ,-! __ 2:2:7 () ........... 84 "::':F: C) C) ('3{:3 1 4.'-' ':'7,'-" S 24'70, :--:4 24 ()0.00 1 :-]. :2:/-, S '2 5 7 () ,, ::: 42' 5 {)(). () (') :[ .~ ~79 S ...-,_,7o :;;..:'F.;"70 .'307C3 '.7' 77 (). 84 2::~:'7C.) .'" .............. '""-'c: "~ ".!'_ ....... ~ _ .= . _."" .......... . ~-~,4~,..-~ ){,) ,o J l~,.&~ :_D_ ' 2 9 '7 {). 84 :2',-.-." ()(). ()0 16.5 9 S :':: 0 70. :--: 4 30 (')0 .0 ('.:'3 17 ./t. :3 .:,"" :3270 3270.84 '-'""' .... 19.: 75 S · :.,.4 C) {.). (~) {,.) ' :33 7 C3:2:::':':'7 () ' ::~.. 4 ' ' 5::::0('), ('3 c) ' . . ,:.'--' "'U, '--'-,:,/'=, S 2471 :3 z}..'Z (-)_..,..,5-%4__, i :5!4 ¢.(!:,_c_;~.('2 ' .-', .) 19 '.::'; · .::,._ 71 ..::,..:, 70.84 :':::.=; (')C) 00 14 4 {2) :3672 :}.': .6 '70.. :-':.: 4 :36 (.'.30 . (){.'.3 ,.'-- ..... z.":'-..., ':'..., F:OHIO ALASKA PETROLEUM E:O. [I--2'.--.~ PRUDHOE BAY ALASKA .c;pERRY-SUN WELL .~iiA'UlzvTIg~"LF]'iMPalgV ANF:HORAGE ALASKA CFiMF2LI]:AT~AN 1lATE DEL-:EMBER 16, 1985 DATE OF L-]LIRVEY DECEMBER 14, 1985 dOB NLIMBER AK-BO-501'--'''~- ... KELLY BUSH I NG ELEV...= "i....::::170,' 84':.' FT, · ' F_IF'ERATi]R-E. '.:;FI I ERS;'.'" ,.i ': .: : i:. .. :.:.'. '." INTERPOLATED VALLIE'.F.; FOR EVEN 10C) FEET OF SLIB-SEA DEF'TH 'I-RLIE SLIB-SEA MEASURED VERT I C:AL VERT I C:AL I]EF'TH DEPTH DEF'TH TOTAL RECTANGLILAR COORD I NA]:ES :'" MD-TVD NORTH/SF,JTH EAST/WEF.;T DIFFERENCE VERT I CAI_ .... CORRECT 1 ON :3774 :3770. L:: 4 :':!::.:.:77 :38'70. :_::4 · :, r,~,=, U:2:9 7 0 · 8 4 4086 4070.84 41 ..._', ~ 4170, 8.4 4 :':: C'~ 1 427 o. :::4 4. 412 4:37 c). :iii: 4 Z' :-'""'~ ... ~-._,.,: .... 4 4 '7 (') ::2: 4. :3 7C)(') OC) 1.5 ::~:':~ N :31 4:3 E ':' .=;,c) :38C) C). ()0 ._,._':'5.69 l"J 42, 97 E : . . 6. .¢.'-' 1 3 9 C)0.0 0 .. .j='z~.?. 4 8 N . :.;: 5 7.. 61 '::i E.:..:.,:.::.,::. 10.' 0 5 " N . :...., ... :.. ., ._ ....~ 4000. ('~A ~7, '.--'5 .i .? ::'.. 5 .c:": , - . ,~'- . 4.100,. 00'?' .: :,' 11" '"" "' "'" . .~..,71 N.L'i"/:i.11':::11:::'95 8:3 E. '.:.::.'.':...-~. 20 4200 C)0 1 =''-' . ,.,.:',. 76 1'4 120.69 E ::-: 1. C) 5 :-'i:. 86 4 2 ...... (')C). C)C) 191 · 61 N 14 9 .6 0 E 41 . ,:,'-'.::'-' 1 C) · 7'7 4.4 C) 0, C) 0 2:31,11 N .1. 8: 37 4/:,4 C) 4570,, ,_,4 Zl"7'~''' ,,..,:, 4/:,70 84 : · _,.,=, 47'70,84 4 '.-.-z 9 E:487 (). :34 · _, 118 4970. :::: 4 4. :::_ C). (')... 0 C) 41 ~'::'. 69 Iq ,:,1 '~,!1~'" i,,~I,"1 · .1~., i/__~` E 127 .7:3 2 C). 07 49 ........ 0 c). C:,,:') 4.':=,9 .6 Zl. N 406 .44 E 148 .1 ...., '=' :2c). 37 :_--;OHIO ALASKA F'ETROLELIM F:O. D--:29 . PRLIDHOE BAY ALASKA SRERRY=SUN WElL-SURVEYING COMF'ANY ANCHORAGE ALASKA LE:O~E'U]]AT T F~N [IATF DECEMBER 16, 1985 · "PAGE: 9 DATE OF SURVEY DECEMBER 14, 1985 JOB NUMBER AK-BO-501'''~' KELLY BLISH I NG ELEV. ':70': 84 'FT. 01E_'ERATOR-E. SELLERS INTERF'OLATED VALUE'._:; FOR EVEN 100 FEET OF SI_lB-SEA DEPTH MEASURED TRUE VERT I CAL [!ED_II&. SLIB-SEA VERTI CAL .~E.F2]LH. TOTAL RECTANGI_~LAR COORDINATES ' MD-TVD INDJR]'_H/_SOfJ.]'Ii EA'.ST/WEST D IEEERENCE 5990 5670.84 5600.00 ,6116 5770~ 84 .57~0. QD 6241 5870.84 5800.00 6367 5970.84 5900.00 6493 6070, 84 .600~00 6618 6170.84 6100.00 6742 6270.84 6200.00 6866 6370.84 6300.00 6988 6470.84 6400.00 7109 6570.84 6500.00 7229 6670.84 6600.00 871 .1..., N 937, 02_N 1002.6'7 N 1068.11 N 11'.97.92 N 12/_-.1.4'.9 N 1323 F,'z' Iq 138:':.:. :-':./:. N 1442.40 N 1498.66 N 714.36 E 319.26 ':'4.~, '-' 753,4:'~ E ..,_ .... , ,~; 1 792.64 E 371.1F~ ."831.77 E 396.85 870..'62 ' E 422.47 908.83 E 447.43 946.46 E 471.76 983.79 E 495.25 . . ozo,o.):..E. 517 59 089.37 E 558.33 VERT I CAL C~BBEC:T I ON 25. 25. '25. ~5. 24. 24. 23. 77 75 62 96, %., ..,~ 49 10 /:,4. 7347 6770.84 67 O, 0.00 7464 6 E: 70.84 /-:.8(] 0. ,~:~ 0 7 .... .~ '-'=, 1 697 C.). :--: 4 690 (). 00 7698 7(Y70.84 7000.00 7816 7170.84 7100. O0 7S/:35 7270.84 7200. OCJ :F:055 7:_::70.84 7300. ()0 8176 7470.84. 7400.00 155'-::.'. 75 N 16,(...,. ""=' N .,~l ...,I 1657. 1707.94 N 1758.40 N 1 ,?,.05,, .:;9_4 N 1862./.:.4 N 1915.59 N 1121.38 E 576.4.5 1152.78 E 59:3.72 1 !~4,.99 E 610, 96. '-, ,', .,..T! ' -- ° '":,,::, , 1 ~: 1 o. :; O E ....: :.; ,..,... ~,,~ .... ~'~4 ..' -"',l:- ' :,-,. :'.: :.': ..':' :: . c.~ ..' 1 ....c, 4, 6,:, · E .Z.-,4~. 6:3 ' .' .:. 1292,,.77 :' E' ~.-.,54_.4~ 1333, 69 ['-- 684.62 1376.20 E 705,50 18.11 17.2'7 1_7.24 17.08 . 17,59 18.78 20.22 20.87 F;OHIO ALA'.---;KA F'ETROLELII'I c:n. ..... D_-_2:"~ F'RUDHOE BAY ALA.'--;KA ...... -':q F! E R R-¥-=~%IN- WELL--SUR]CE:~-I N G COMPANY ANC:HORAGE ALASKA COLqRU:FAT I ON DATE DECEMBER 16, 1 '-)'o'-"='._, DATE OF SLIRVEY DECEMBER 14, 1985 dOB NUMBER AK-BO-501'-"-' I o · _ KELLY B...I._,HING ELEV I-IPERAI'I]R .-F _- .c;P'l I 70,84 FT, IN]"ERF'OLA]-ED VALI...IES FAR EVEN IOC) FEET nF .:,I_B-._,EA r~EF'TH 1'4EAF;URED DEF' 'TH T R I._1E :F3 LIB - :s; E A VE;FR T I E:AL. VERT I CAL I:~r.='..'_E'.]~ H_ .............. ___~[LE'.P_I"._H~ ]'OTAL RECTANGUL~AFR COORB I PLATES .N_¢J.R_'TH/_:~OUT_H_ . EAL:;T/WEST MD-TVD D I FFERENCE_ . VERT I C:AL' · ::: 29/-, 75'70. 84 :iF.: 4.16, 7,5'70.84 ,= .... :,._ 7 7 7 0.8 4 f'ir I'"' ,.-., 6.J 4 7870.84 ,771 79'70.84 8 88 :--: :iF:: 070. 84 9004 ::317' O. 84 7 !5 ('_')(). C.)0 19,':, 8. 18 N '7/-, (')C). (')C) 2:(] 19.54. Iq j-__.~. '..~., __.~. _:'_ ......... -*. . . '-,(' - ( .... 77 C)0 00 ~..) 7 (), J..:, N 78C) 0.00 .2119.86 N 7'F' 00, 0 (! .~..I..6Z_-z.:~_._N__ :!ii: C)0 0 ,, ()0 '":"-" 1:3. 'T,, 9 Iq .. ,~..~. , . ~::: 1 (")("~ ()0 .... '"":'"" 0'7 N '" .., ,, . . .,::..,g. ,...I ::/. 141 ::::. 27 E 726.04: 20.56 14_.__=.';,, :36 E 7~.,... 7.6 1.9.7 o 1500.1:2 E 764.96 19.:21 1.=~4o 1":' E 78:3 64 18 67 - . # 4:. ~ . 1./_-, t 7.64 E: 81 '7 89 '1. 6." "::; .1. :,.:, 6. 1 '7 IF_- . 16 27' 5;' 120 :iii: 27 (),.:E: 4 ,:, ,.:, '7. (]..o4'~' '" .9:2:47 ::2:470. 84 945 9 :F: 5 '7 () ,, 8 4. 14'i, · 1 7.::, 0 .' 6,= E o 6 ,:,. o,::, : 8:300,0 () :234:3, 4'7 N ' """ · '" '? ' '~'' "" ' '"' 84c~(). 0() . 238:I.,77 Iq ' , l'.:." 'J' __ ::::5()()" ('~0 ~419 r:.;('~ bi 1;i. o."'"c76 =.,:.44.j 1., 6,::,"" ':E ,:.,76.. ,=,o z-- .,.'"" """-::' "':" ;7... ' 12:i E""7" :"::"' '12 · 54' ,::,o00. C)() ':-::' 4 f::; /-, .... . L:i:4. N 1 ,.,o.-,/.:, ..,. 94 E 90 ]. . .=';4 12 .41 9 6. :.34 :iii: 7"70. 8 4 8 '2' 0 (). C.)0 2 4'i.:/4 ,, 1 :l N 18 71.4 6, Ii{ 91:3.7 0 :l 2. 1 '7 ' . . 9'7 9/-, ::4 ::::', '7 ("~ :::', 4 ::::;:::0 ("~ ~"~ ("l"::'.=; 5:'1 4, :':: 1~ 1 904 ~i_.=; [:,.':' .... z.:,i:,i._'L'.:~'?'-' '=' z, ,, ......... · .:_ ...".' . ...... '_.t"..~.. ::,, ~.,..~ ...................... :c'-.'%.,.::..::,-,~.,.::,-,-: .................... :~"" "',,,.":,-~..;=..~ ....... ;'-~ ................ ~ ~1 . "a ":' .... '"" ? ..... '""" '"""::' ..... '" '=' ""'':"' .' ".',"," ' · ::; 0 7 ,::, .': 70. ,::,4c:, :. 00, O0 x. ,., 6 ,::, . ./:, .., N 1 ~ .:,6.40 E '.:::' :F: c"', -'. :B() 1.1,. :36 · ·..' .. ' £ .., 4,:,..t~: . .... ~.~. o~ oo ?OTO. N '' '" "' ': _l 00. Q(!___ __' ,.._2-/"'.~A,,....?;:%N__ -J.~':2,[:. 97:[::.--_' . ,. "::,,,,=":'z,,A,~.'" . " ~ .-t. ,.:,"6 · 7 84 9 1 ()17() 92()6 ,, 4.6 9 .'1. :'2:!!"";. 6:3 _':::_'~ 57 ,, 44 I',1 2010. 07 E 9/:,:.3.54. 4.05 ]"I-.~E (: AI..CUI....AT I I::)l':,l F'F:~OCE1311[~E:i::; I I::i!:E fi. L :1' hE:fiB I N]"EBE'.nt A'I:Z AN_BEZIdEEN ...................................................................................... .=t._~__tm..,=. ....... ~. - ~ ..... ..t.., .~-.,. ~.,: ....... THE I',IEAREST.'2() F:L-IOT MIl, (FF(OM .I"~A£ ill'..:.'; [)1:' i. .... II",VA1UI-~E) F'L IN I .:, ,. .. . · 5CRLE :- t INCH TO 1000.00 / 1000.0 PRUONOE 8RY SOHIO RLRSKR PETRQLEUH CO. 0 -29 OECEHBER ~4, t985 -10~0.00 RK-SQ-50~23 TRUE NORTH 10170 -2000.00 -1000.0 O~ O0 ~ooh. oo 2oo~.oo .-tO00. O0 HORIZONTAL PRgJECT!ON 0.00 2000.00 4000.00 5CRLE :- 1 INCH TO 2000.00 / 2000.0 P~UOH~E 8RT 0-29 RK-80-50123 SDHID RLFtSKR PETROLEUM CC 6000.00 8000.00 10000.001 I 9206.46 lOl?O 2060. oo 4oho. oo VERT I C'FIL PROJECT T ON .- £ SOHIO ALASKA PETROLEUM CO. PAD-D (1~-. 13. II. 13) D'29 Controlled Drilling Consultants, Inc. LES HENDERSON 333-1552 CONTROLLED DRILLING CONSULTANTS, INC. 4234 KINGSTON DR. Anchorage, Alaska !99504 (907) 333-1552 · ~ Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502. DeCember: 15, 1985 RE~ Magnetic Single Shot Survey Job No..~1185-024 Well D-29 (14-13'11-13) Prudhoe Bay Field North Slope, Alaska Date of Survey: .11-24-85 to 12-02-85. '' . Dear Mr. Rose: Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on. the abo~e well. The method used in calculating this survey was Radius of Curvature The depth of the survey was 3400 to 9339 Thank you for giving us this opportunity to be of service. . Yours very truly, Controlled Drilling Consultants, Inc. Waylahd .Yancy Directional Supervisor !AC.;i4ET i C Sii4 ]LE SHOT :-]UF.:"v'Eh-' 'AF.:, ): i ~.S:._ OF C:UR'.'R'"".,. ;UR',/E:'? RAN BY iJA':"LRND : 0;.',~ P' ' T El:: FOiE , L,I ' .. , ~.:. 5- L.. L. ;.'. .... :;:i: 'i':: K E: '.;¥ L.. E '.' '7' ';;. ',..3 q- i::' '~" , ::;~ i i:;::' "'-' '~.:' ~''F ~:: 2! 4 ,."' 'I '" ';.:-; :::; ..... ',' L'7~ :';" ,. , ,.. i ,"" ;, i; :'" ,.,--: :": .7 ~-~.' r, C:; !;;' "~-'"' :"- ~'" 6 E T R U E .i E R S, D R Z F T ',,,' E R T I C,~::~ L 3 U.E'~ ..',E F' T H AHGLE [:,EPTH SEA D i"1 0 0 0 , 00 -70, '34 ~¥Ul,le.[. VERTICAL T'O 3400 ~-, ~ 34 O0 0 0 3524. 5 6 3657 i O O 3790 i 2 42 39i5 i5 30 4038 18 42 4 'l 6'..'~._ ~.. '~ i 24 . 42,'.'37 24. ~'"' 4'1.12 2..6 .36 4536 28. 48 4'66 t 32. E, 5i52 34. 36 5301 3.6 0 5517 ,36 54 5594 36 5,:t. 6057 37' 42 6419 37' ~8 6926 2:5 i 2 7335:31 54 7644 3 t 6 3400, O0 3523,84 3655,64 39 07 2:5 4024 80 414. t "'~'~ 4256 o.-.:-""" 4369 04 ,4478 83 4586 57 4996 ~ 68 51't8 29 5292 OS 00 .., -z. 572I S~'I 6009 i 0 64'~ 7 94 6758 76 7022 22 3.3:-'2_" 9, 3458, 0 C, 358.4., 80 ._'"57 t 5, 3836 ,, 4 "t 39513,96 4 07 0,4 4185,4 4407 ? 9 45 'i '~'': 4925 5 04. 7' 4 522 'l. 5282 76 565~ 07 598 $ 26 6:347, 'I 0 6687 ,. 9;2 695 '~ ...... ' ¥' L; "- P.L. C 00 ¢'. C, ! i"{ is: T E S ;2 g:, '::',.,- E: ..... '¢ ~": ';::' 6 ':~:, 'i f" ,. , ::,, ,:,::,, {) 7 ":,i;' 2 ' 4 ;iii:-" "iF.', ~':' z: ,. ~ 4 i 'i "TM ::i '7' ;:)3,5 ;5 'i ? :2 E: , ~:::, S !2 ~':i ;:::~ '.!~, ?;3 I TRUE ,iE¢~S, DRIFT VERTZE:AL )EPTH ~qI4GLE DEPTH [:, 8050 33 4S 7364.,S0 8513 33 0 7751 ,33 90ii 30 iS 8175,22 9...,.-, .~ .,.,~,'.-.._':'.'7 i 8, 8462 .6 30TTOI'i HOLE CLOSURE 2 :S 0 ? , 7 '8 :2 ? S 0 ,. ,,~- 5 M -- { .q i4 i> O"F H E F~: M E A S U R E [)EPTH TRUE VERTICAL DEPTH ~- r~ b. z.. r: :': {1' E C: O i7i 27'i 37i 47'i 87i 97'~ i '2 7 t i371 I 47 t '157i 't 67 I 'f 77 ~ 2 07 ~ 2 ~ 71 227 ~ .~,,, 1 247 't 2 d, 71 277'~ 287' ~ u, ,> 7 ~ 34 7 i O 17i 27i 37i 47i 57i 67i 77i 8'7 i 97i lO7i 'J 17i i 27' i 'i ~7 't i 471 't57i '167i t 77i i97! 2071 2t71 2271 237i. 247't ,.,::, .,:) ,' 1 2E, 71 ,""* '"~, '.'IF, ,,:.2. ,' ¢ } 297 't 3071 3i 71 327 i 3,.37! 347 't - 7 'i i 00 200 G 00 400 506' '7'00 6:': 0 !} ':"': I~; ~"t 'i 'iO0 i, 2:0 0 1400 I 5 00 '! 6 O 9 1700 tS00 2,000 .'2 .") 00 2:",4.00 i,:2' 500 2600 '2. 7' 00 2. f.:_:~ 0 0 '"' ':'~ 0 0 '2:4 0 0 0 0 0 0 '3 0 0 0 0 0 0 0 0 O ~,.~ 0 0 0 0 0 0 0 O' 0 0 0 . 00 , 00 :.:; , 00 ,00 S ,00 S ,00 S , 00 S ., 00 , 0 0 S ..00 S ,00 S , I] 0 5:!; , O 0 S ,00 S 00 S 0 0 S O0 S O0 S 00 S 0 0 S O0 S O0 S 00 00:3 , '0 () S ,00 S , 00 ,, 00 S , !] 0 S ,. 80 S ,00 S ,.OO S ,OO S. ?i E: ;q S U F.: E_' i:..', E: P T H TRUE ',,--" E R T i C A !_ 'S U E: i'.i :.:: .... :':, :. O E P T iff '::-';" '"' .... C: 0 R F: E :'3 T: G ?; 3::¢/,' 398 i 4 087 4 i 94 430,'3'., 44i 4 452';"' 4- 6,4 ;~ 476 t 5000 ~t2~ =-o,4.3 . 549t _ . 574'f 5866 6 i i9 6245 .. 6496 6745 6868 699 i 7' 5 S 4 :357 i 36.71 3:77 i ..'. C-¢. ," ~, .:, ~ ,' i 4 07 'J 4i7i 4=.':' 7 i 437 i 447i 457i 477i 487'i 4.9'7 i ..... ',::r L ~ J 5 '~ 7 i 537i 547 'J 56? 1 57'~J 597J 607't 6 i 71 627~ 647i 657i 677 ~ 687 ~ 697i :,'iE~SU~'.ED hEP'TH ANC', i'i E ¢~ S U R E £:, ['.~ E F' T H OTHEF: t:,F~ TRUE ',,,: E R'T I CAL E P T H 770i 78 '! 'B ~R 057 8t77 8"" 97.- 8,4. i 7 85~6 8655 8890 9 O 06 9. i 2 i · -' 07 ¢' 7 ''~.- 7 737 747 757 767 787 7'97 807 8':27 8:,:77 S46 t, !, i. i i t l i i i i 3 O0 00 O0 O0 O0 0 r, 00 O0 00 O0 :947 6 !S E, 7' i~', ? 2,: E, 7 E., 5 :.':' ',ii: 4 '.ii;' S S .,S 4. ',iii, 7 '~7 i ,.'f.~ 20 20 20 i 9 i 7 t7 S 0 iq '[ F~ i.¢ E L ! .... Z NT ER PF~LP~TEi:.:, MEASURED DEF'TH 0 ! O00 2000 3000 .-$ O00 5000 6000 7000 8000 9000 TRUE T i C: A 0, .-- 7 '~ 1 O 00, '~ ':,2: '? ,=. 00 O, ~ '.:? 2 3 0 0 0: ':J'. 9 ':2 '.:,', 3 989, :3 9 '; .? 4871 , ,~. f:? '" ',"' · ,.., · ... ~:, ,' ,'., !56 i;~ 6 4 79, 6 ,:~ 'J 3 732.3, 7' ':2 !'f; ;2 84- 6-':'-.,.,, ¢::4. :2, S; 3 O0 O0 0 :"~ O0 ? ':'5.: 69 "i~'.S!', 4 i "",~ 4:2.34. ;;:; 4..6 0 ~ 6 S.~ [',I i26~,S() E SOHIO ~ALASKA[ PETRO~UM.; WELL O-~ (,1~-1~-I1-t~}~ MAG~tC~ SIN, I ALI:. DI · ' .. :PTH$ SitOWN ! Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. · . 0PERA~0~, WELL NAME ,AND NU~IBER and Materials to be received-by.' /--- Reports Date Required Date Received Remarks Completion Report 7~ ~ / -- /d-'~ ..... ~~'~._ Samples .. . 4/s - P I b (~ 4/~-h/ - " G/: Cbr~ 'De,erlpt~on .. Re Plat Inclination Survey ~ ~ec~o~ ~-/~.- ~~r~ Drill Stem Test Reports .... hi/ Production Test Reports~ ~~~ ~ ......._.~ ~o, ~u. 7~:i~/~_:~~~ L.FJ.04 October 22, 1985 Mr. R. S. Allan District Drilling Engineer Sohio Alaska Petroleum Company P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Unit D-29 Sohio Alaska Petroleum Company Permit No. 85-253 Sur. Loc. 1985'SNL, !067'~TEL, Sec. 23, TllN, R!3E, UPM. Btmhole Loc. 746'NSL, 853'EkrL, Sec. 13, TllN, R13E, UPM. Dear Mr. Allan: Enclosed is the apProved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before~the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. tr~ ,~ly~-y9!~ s, ~ Chairman o f Alaska Oil and Gas Conser%-ation Commission BY ORDER OF THE CO~ISSION be Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery " SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~612 September 17, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton Gentlemen' ~-~ell D-2~) (14-13-11-12) PBU Enclosed are the following documents in triplicate along with our check for $100.00 to cover the permit filing fee' · 2. -3. 4. 5. 6. Application for Pem~it to Drill Proposed drilling Program Outline Proposed Blowout Prevention Diagram Surveyor's Plat showing Well Location Directional Map 20" Diverter Diagram If you have any questions, please call Ted Stagg at 564-5173. Very truly yours, Soi~io Alaska Petroleum Company R. S. Allan District Drilling Engineer RSA :MSS' sop 101185'1026N3 Enclosure cc' Well File #17 Adrian Clark Well Records - V. Aldridge Dave Walters STATE OF ALASKA ALASKA OI'~--,AN D GAS CONSERVATION COM-~SSION PERMIT TO DRILL 20 AAC 25.O05 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL]{] DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE E~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 9. Unit or lease name 1985' SNL, 1067' WEL, Sec. 23, TllN, R13E, UPM At-top of.proposed producing interval 600' NSL, 750' EWL, Sec. 13, TllN, R13E, UPM At total deptbc~t/ 746' S~L~ 853' EWL, Sec. 13, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF etc.) I ' 6. Lease designation and serial no. 60 KB I ADL 28285 Prudhoe Bay Unit 10. Well number D-29 (14-13-11-13) PBU 11. Field and pool Prudhoe Bay Prudhoe Oil Pool 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Safeco Ins. 2975387 AmountS200,000 13. Distance and direction from nearest town NW of Deadhorse 10 miles 16. Proposed depth (MD & TVD) 10147' MD 9191' TVD feet 14. Distance to nearest property or lease line ADL 28305 750 feet 17. Number of acres in lease 2560 15. Distance to nearest drilling or completed wellD-14 1600 feet 18. Approximate spud date November 05, 1985 19. If deviated (see 20 AAC 25.050) 10 ~ 120. Anticipated pressures KICK OFF POINT 3400 feet. MAXIMUM HOLEANGLE 33 ° l (see 20 AAC 25.035 (c) (2) 3330 psig@~ Surface 4390 psig@ 8800 ft. TD (TVD) SIZE Hole 36" 17-1/2 12-1/4 8-1/2" Casing ~.0x30" I'13-3/8 "9-5/8" Weight Insular 72# 47# 7" 26# 22. Describe proposed program: Grade I ' :ed Con~u L-80 lB L-80 [B L-80 ~I Proposed Casing, Liner and Cementing Program CASING AND LINER 3oupling c tor utt utt J4S Length 80' 2650' 9286' 1081' SETTING DEPTH MD TOP TVD Surfacd Surfac SurfaC! 9066' M D BOTTOM TV D 110TM 110~ 2680' 2680' I 10147' Ii 9191' QUANTITY OF CEMENT (include stage data) 8cu.yds. Concrete 3720cu.ft. Permafrost 1690cu.ft.ClassG+8%Ge] '230cu.ft. Class G 308cu. ft. Class=+5%KCI See attached Proposed Drilling and Completion Program. RECEIVED OCT 7 1985 Alaska 0~I ~ b:~ C.':~,.~s. Commission Aachorage 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNED TITLE Drilling Engineer The space be~vv for C CONDITIONS OF APPROVAL Samples required Mud log required i--lyES [~,NO [--J YES [~O Permit number Approval date r~,.5-'- .~~ ~ .., 1{)/22/85 Form 10-401 Rev. 7-1-80 Directional Survey required [~YES []NO APl number SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE October 22, 1985 by order of the Commission Submit in triplicate PROPOSED DRILLING AND COMPLETION PROGRAM WELL D-29 (14-13-il-13) PBU Install and cement 80' of 20" x 30" insulated conductor to surface~ Install 20" diverter system. Drill 17-1/2" hole to 2700' MD and cement 13-3/8" 72# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W]Pj pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3300 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9-5/8" 47# L-80 Buttress casing to within 5' of 12-1/4" TD and cement in two stages: First stage using Class G cement around the 9-5/8" shoe. The second stage to be downsqueezed in the 13-3/8" x 9-5/8" annulus followed by nonfreezing fluid. Directionally drill 8-1/2" hole to TD~ Run 7" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement with 5% KCL. Clean out to 7" float equipment~ Change over to 9'6 ppg. NaC1 completion fluid. Run CBL. Test casing and lap to 3000 psi~ Run 9-5/8" production packer on internal plastic coated tubing with gas lift mandrels and a sliding sleeve. Set packer above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Suspend well for perforating subsequent to rig release. Tubing Size: 5-1/2",17#, L-80, A/B Mod. BTC IPC w/7GLM's. Tailpipe Size: 5-1/2", 17#, L-80, BTC. Note: 0285:0632N: 4 ACC:SOP Plug wells D-5, D-7 and D,15 for close drill by situations. MasV,~ 0~ & Gas Co~s. Go~,...ss'~(~n~ 20" x 30" Insulated Conductor Ball Valve 13 3/8" Casing Shoe 17 1/2" Open Hole PROPOSED DONNHOLE DIAGRA~-~ k~LL D-29 (14-13-11-13): PROPOSED DEPTH BKB Il0' 2050' 2680' 2700' ACTUAL DE~ BKB 5-1/2", 17#, L-80, A/B MOD. BTC. IPC w/7 GLM'S .9-. 5/8./packer Tieback Assembly .. 8846' 9066' 9 5/8" Casing Shoe 12 1/4" Hole 9316' 9321' 7" PBTD 7" Liner Shoe 8 1/2" Open Hole 10107' 10147' 10147' ,"EiV£O,. Anchorage 5/~' TRIPLE RAM STACK I II -- 5000 PSI WP DRILLING ' i , I ANNULAR PREVENTER PIPE RAMS BLIND RAMS KILL LINE CHECK GATE GATE DRILLING SPOOL 4" CHOKE LINE GATE HYDR. ASST. GATE PIPE RAMS I i : 200'------~, 4 0 ~0 20 30 - ~ I0 20 :50 40 0 i · ~ ~ ~ _ (Actual) % ,726' D-25 (Proposed) I ___ ___~ ..... ~(~ ~p~,-- WELL D- :3 : ~ t'z l I ~Z~- ~ ~ O, ''~~°~ x ~ ; ~ ~0' ' ~ D-24(Pr°p°sed)l' .~_ ..... ' ~l: "~2~fz'-/'-//- roposed) ~ - -~, ~c ~ ~ ,: "-"-"-"~] OI ~ b I . / 2 D- 6 - ~( LOC. THIS ~ur,y EY ) I ~1 I '- ,,o,u,,, ~'~/~ ~l,~ ~oo ,~ ~ ~ ~ I ~ '- o~ ~-~ x: e54,451 i ~I ~ I~ ~ ,~,'~ _ ~ ~o~.' % ,--- , ' ~ 120' 60'~ / k _1 SEC. 25 .... ~.~. SEC. 24_ . l ..... ~ , ,'¢~-~-.~~..,.. SECTIONS 13,14,2. a24 ~: (WELL LOCATIONS' ~ J ~ ~ SCALE 1"=1/2 MILE ~60' ~ ~ 320' ~,= PAD DETAIL CERTIFlOATE OF ~UHVE~OR SCALE I"= 200' I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, and that all dimensions and other details are correct. Date SURVEYOR PLAT I of :3 io/8/85 5/27/70 10/11/74 I0/I5/74 5/13/75 9/24./75 ADDED WELLS D-24, 25 & 29 (Proposed) O~ REVISED TO INCLUDE REPLACEMENT WELL PAD D-5(25-24-11-15R) EXTENDED SOUTH END OF PAD. C.J.R. ADDED D-6 PROPOSED TOP SAG. RS. ST. LOC.___.. ,,-,.,, C. J.R. WELL D-7 PROR I& D-I,2,$,4&~;)I~J.N~L~Iv ~- I) C.J.R. ADDED REVISED WELLS D-6 & D-7 I\~,~ ~-,-- C.J.R. OCT 1 7 1985 AlasKa Oil & Gas Cons. Commission Anchorage PAD 6-11-13 (PAD"D") Locoted in NE I/4 PROTRACTED SEC. 231T. 11 N.iR.13 E.~ UMIAT MER.~ ALASKA Surveyed for B.P. ALASKA INC. Surveyed by EM. LINDSEY & ASSOC. LAND ~ HYDROGRAPHIC SURvEYoRs 2502 West Northern Lights Boulevord Box 4-081 Anchoroge Aloska /,' ~'~, J~ - 2. F DRILLING RISER 20" 2000 PSI WP ANNULAR PREVENTOR 10 3/4" Hydraulic Butterfly ~ralve opens when Annular Preventer closes. GROUND LEVEL i 10" DIVERTER 12" MAX. i iiI I DRILLING SPOOL 20" CONDUCTOR PIPE NOTE: DIVERTER LINE HAS TWO DIRECTION DISCHARGE CAPABILITY AFTER LEAVING RIG SUB-BASES. "'-- SOTS. mACE HOLE-Di-%rE_-'~EL'R SYST'~vl'''-''' lines venting 90© apart 10 3/4" m~nual butterfly valves 1. All pipe connections 150f ~Si Flanpes or welded connections. 2. ~_~nual 10 3/4" butterfly va]ves~ safety wired in open position at diverter line tee. ~ 10 3/4" 55~ Buttress 10-3/4" Hydraulic operated Butter fly valve ~ / ~ 20" Diverter Spool w/10 3/4" ~ Side O~t]et. (8) . . ~. (3) (9 thru 12) . I0. (10 and 1~ ~ 12. (4) .c g,g4ff, , (13 thru 21) · (2~ thru 26) <6) ,Add: Geology: ~~ LCS WVA~ MTM ~ rev: 03/13/85 6.011 Engineering: ,, ompany "':" · "' ii ~i: ',?;',... . ..::- .. ' ' .... -: YES NO . :, · , . . 1, Is the permit fee attached ......................................... 3. ' Is well located, proper distance from property line ........ !ii"' 4, Is. well located proper distance from other wells .......... i ''' ' 5. Is sufficient undedicated acreage available in this pool ..... Is .well to be deviated and is wellbore plat included 7, Is operator the only affected party .......................... Can petit be approved before ten-da7 wait: .......................... 13. -14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. Does operator have a bond in force .................................. Is a conservation order needed ...................................... · Is administrative approval needed '- Is the lease number appropriate · ('7./ , , Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement coverall known productive horizons ..................... Will surface casing protect fresh water zones ....................... Will all casing .give adequate safety in collapse., tension axed burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ diverter system required .IS a ....................................... Are necessary diagrams of diverter and BOP equipment attached Does BOPE have sufficient pressure rating - Test to m~_~psmg Does the choke manifold comply w/API RP-53 (Feb.78) .................. Is the presence of H2S gas probable ................................. Additional requirements ............................................. INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. · SHORE , , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . * ****************************** . ............................ * * ....... SCHLUFiBERGER ....... * . ............................ * ****************************** 'JUL 5 1 1998 Oil & G~s Oo,,s. uomm~$s:on A~omge COMPANY NAME : BP EXPLORATION WELL NAME : D-29 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-21470-00 REFERENCE NO : 98336 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE · 98/07/10 ORIGIN : FLIC REEL NAME : 98336 CONTINUATION # : PREVIOUS REEL : COf~4ENT : BP EXPLORATION, PRUDHOE BAY, D-29, API #50-029-21470-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/07/10 ORIGIN : FLIC TAPE NAME : 98336 CONTINUATION # : 1 PREVIOUS TAPE : CO~94ENT : BP EXPLORATION, PRUDHOE BAY, D-29, API #50-029-21470-00 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NAME: D-29 API NUMBER: 500292147000 OPERATOR: BP Exploration LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: lO-JUL-98 JOB NUMBER: 98336 LOGGING ENGINEER: H. KIRKBY OPERATOR WITNESS: KISSINGGER SURFACE LOCATION SECTION: 23 TOWNSHIP: liN RANGE: 13E FNL: FSL: 1985 FEL: FWL: 1067 ELEVATION(FT FROM MSL O) KELLY BUSHING: 70.80 DERRICK FLOOR: 69.80 GROUND LEVEL: 42.50 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) .............................................. 1ST STRING 8.500 7.000 10004.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASUR3F~ DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 9993.5 9982.0 9973.5 9955.0 9952.5 9941.5 9930.5 9929.0 9922.0 9914.5 9906.5 9882.0 9869.0 9868.5 9862.5 9858.0 9847.5 9846.5 9834.0 9811 5 9784 5 9775 5 9760 5 9758 5 9749 5 9736 0 9735 0 9727 0 9719 5 9719 0 9704 5 9704 0 9700 5 9679.0 9653.0 9652.5 9650.5 9641.5 9633.0 9632.0 9625.5 9624.0 9615.5 9615.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD .............. 88887.5 88887.5 9952.0 9942.5 9930.0 9921.5 9914.0 9906.0 9867.5 9858.0 9846.5 9811.0 9760.0 9748.5 9736.0 9727.5 9719.5 9704.0 9678.0 9652.5 9650.0 9640.0 9632.0 9624.0 9615.5 9993.0 9981.0 9973.0 9954.0 9926.5 9881.5 9868.0 9862.5 9847.0 9834.5 9785.0 9776.0 9758.5 9736.0 9720.0 9704.0 9701.5 9653.0 9633.5 9625.5 9615.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 9599.0 9599.0 9597.5 9599.0 9582.5 9582.5 9581.5 9582.5 9579.0 9579.0 9570.0 9570.0 9569.5 9570.0 9561.0 9560.5 9546.5 9547.0 9530.5 9530.5 9530.0 9530.5 9508.0 9508.0 9507.5 9508.0 9506.0 9506.0 9505.0 9505.5 9499.5 9499.5 9488.0 9489.0 9485.0 9485.0 9484.5 9485.0 9481.5 9482.0 9476.5 9476.5 9475.5 9476.5 9473.5 9473.5 9474.0 9471.5 9472.0 9464.0 9465.0 9464.5 9453.0 9454.0 9451.0 9451.0 9444.5 9445.5 9408.5 9408.0 9399.5 9400.5 9391.5 9391.5 9385.5 9386.0 9385.0 9384.5 9373.0 9373.0 9372.0 9373.0 9359.0 9359.5 9355.0 9355.5 9349.5 9349.5 9342.5 9343.0 9336.0 9336.0 9321.0 9320.5 9319.0 9320.5 9314.0 9315.0 9312.5 9313.5 9305.0 9305.5 100.0 100.5 99.5 REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED 3 PASS CASED HOLE CNTD DATA ACQUIRED ON BP EXPLORATIONS D-29 WELL. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN THE BASE GAF~D% RAY PROVIDED BY CLIENT TO CNTD PASS #1 GRCHAND THE BASE GAI~4A RAY WITH THE CNTD NPHI CHANNEL. $ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS N-UMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUM~JU~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9988.0 9290.0 CNTD 10006.0 931 O. 0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CN~fD REd, ARKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. ALL DATA HAS BEEN CLIPPED FOR INVALID DATA BEFORE FIRST READING AND AFTER LAST READING. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN FN WN APIN FL SECT BP EXPLORATION PRUDHOE BAY D-29 50-029-21470-00 1985' FSL & 1067' FWL 23 Company Name Field Name Well Name API Serial Number Field Location Section LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 5 TUNI VALU DEFI TOWN 1 IN Township RANG 13E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN MATT KISSINGER Witness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT Depth NPHI Compensated Neutron Porosity, SS Matrix, cali & dead time corr. NRAT Raw Thermal Neutron Ratio CRAT Thermal Neutron Ratio Calibrated NCNT RAW NEAR CNT COUNTS FCNT RAW FAR CNT COUNTS CFTC Corrected Far Detector Count Rate CNTC Corrected Near Detector Count Rate GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: TYPE REPR CODE VALUE 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 1244177 O0 000 00 0 1 1 1 4 68 0000000000 NRAT CNTD 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1244177 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10005.500 NPHI.CNTD 29.820 NRAT. CNTD 5.527 CRAT. CNTD NCNT. CNTD 4058.406 FCNT. CNTD 734.251 CFTC. CNTD 641.110 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1208.000 CCL. CNTD 0.000 DEPT. 9290.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 35.518 TENS.CNTD -999.250 CCL.CNTD -999.250 5.122 3654.475 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · 001C01 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AUJMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCR~4ENT: 0.5000 FILE SUMFIARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9987.0 9290.0 CNTD 9991.0 9314.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888 0 9979 5 9974 0 9963 0 9957 5 9949 0 9929.5 9924.0 9904.0 9895.5 9884.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD .............. 88887.5 88887.0 9973.5 9963.0 9957.5 9923.5 9895.0 9978.5 9948.0 9926.5 9902.5 9883.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 8 9879.0 9876.5 9873.0 9869.5 9868.5 9858.0 9857.0 9846 5 9838 5 9834 0 9793 5 9791 5 9779 0 9775 0 9768 0 9758 0 9736.0 9735.5 9732.5 9728.0 9719.0 9705.0 9659.5 9657.0 9656.5 9646.0 9627.5 9625.0 9615.5 9615.0 9607 5 9599 5 9597 5 9583 0 9582 0 9581 0 9570.5 9569.5 9561.0 9552.0 9550.0 9508.0 9507.5 9485.0 9476.5 9468.5 9467.5 9455.5 9454.0 9450.5 9441.5 9424.0 9422.0 9409.0 9404.0 9879.0 9872.5 9868.0 9858.0 9846.5 9838.0 9790.5 9774.0 9736.0 9728.0 9704.5 9659.5 9657.5 9645.0 9627.0 9615.0 9608.0 9599.0 9583.0 9580.5 9570.5 9561.0 9551.5 9508.0 9485.0 9476.5 9468.5 9454.0 9450.0 9421.5 9408.0 9875.5 9868.5 9857.0 9834.5 9794.0 9779.0 9768.0 9758.0 9736.0 9732.5 9720.0 9704.5 9657.0 9625.5 9615.0 9599.0 9582.5 9570.0 9550.5 9508.0 9485.0 9476.5 9468.0 9456.0 9441.5 9424.5 9404.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 9 9398.5 9391.0 9387.0 9376.5 9374.5 9372.5 9355.5 9350.0 9343.5 9333.0 9321.5 9313.5 9304.5 9296.0 100.0 $ 9373.5 9349.5 9343 0 9333 0 9320 5 9313 5 9303 5 9296 5 100 5 9398.5 9390.5 9387.0 9376.0 9373.0 9355.5 100.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #1ANDGRCH PASS #2, ALSO NPHI PASS #1 AND NPHI PASS #2 CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN FN WN APIN FL SECT TOWN RANG COUN STAT NA TI WI TN SON PDA T EPD FT LMF APD FT EKB FT EDF FT EGL FT TDD FT TDL FT BLI FT TLI FT BP EXPLORATION PRUDHOE BAY D-29 50-029-21470-00 1985' FSL & 1067' FWL 23 lin 13E NORTH SLOPE ALASKA USA MATT KISSINGER 1244177 MSL O. RKB 70.8 70.8 69.8 42.5 10004. 10002. 10006. 9210. Company Name Field Name Well Name API Serial Number Field Location Section Township Range County State or Province Nation Wi tness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Total Depth - Driller Total Depth - Logger Bottom Log Interval Top Log Interval LIS Tape Verification Listing Schlumberger Alaska Computing Center 10-JUL-1998 10:01 PAGE: 10 TUNI VALU DEFI DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT Dep th NPHI Compensated Neutron Porosity, SS Matrix, cali & dead time corr. NRAT Raw Thermal Neutron Ratio CRAT Thermal Neutron Ratio Calibrated NCNT RAW NEAR CNT COUNTS FCNT RAW FAR CNT COUNTS CFTC Corrected Far Detector Count Rate CNTC Corrected Near Detector Count Rate GRCH Gamma Ray in Casing TENS Surface Tension CCL CCLAmplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 11 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUFIB NUI4~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1244177 O0 000 O0 0 2 1 i 4 68 0000000000 NPHI CNTD PU-S 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1244177 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9990.000 NPHI.CNTD 30.752 NRAT. CNTD 5.796 CRAT. CNTD NCNT. CNTD 2692.038 FCNT. CNTD 464.464 CFTC. CNTD 405.546 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1441.000 CCL.CNTD 0.006 5.235 2313.474 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE · 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 12 Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9976.0 9624.0 CNTD 9996.0 9624.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888.0 9993.0 9989.0 9986.0 9982.0 9969.5 9962.0 9958.5 9956.0 9949.5 9934 0 9929 5 9924 0 9922 0 9906 5 9904 0 9895 0 9885 5 9882 5 9869 5 9858 5 9857 0 9847.5 9847.0 9838.0 9831.0 9829.0 9795.5 9793.5 9781.5 9736.5 9736.0 9733.0 9728.0 9720.5 9719.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD .............. 88887.0 88888.5 9993.5 9987.5 9983.0 9981.0 9968.5 9957.5 9923.0 9906.5 9858.0 9847.0 9838. 0 9793.0 9736. 0 9733.0 9720. 0 9959.0 9954.0 9948.0 9932.0 9927.0 9921.0 9902.5 9893.5 9885.0 9881.5 9868.5 9857.0 9847.0 9831.0 9828.5 9795.5 9781.0 9736.0 9728.5 9720.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 13 9704.5 9704.0 9704.5 9686.5 9686.0 9679.0 9679.0 9660.5 9660.0 9653.0 9653.0 9652.5 9653.0 9642.0 9642.0 9628.0 9627.5 9626.0 9625.5 100.0 99.5 99.5 $ REF~RKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND GRCH PASS #3, ALSO NPHI PASS #1 AND NPHI PASS #3 CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Company Name FN PRUDHOE BAY Field Name WN D-29 Well Name APIN 50-029-21470-00 API Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section TOWN 1 iN Township RANG 13 E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN MATT KISSINGER Wi tness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 14 TABLE TYPE : CURV DEFI DEPT Dep th NPHI Compensated Neutron Porosity, SS Matrix, cali & dead time corr. NRAT Raw Thermal Neutron Ratio CRAT Thermal Neutron Ratio Calibrated NCNT RAW NEAR CNT COUNTS FCNT RAW FAR CNT COUNTS CFTC Corrected Far Detector Count Rate CNTC Corrected Near Detector Count Rate GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUFIB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX) DEPT FT 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 15 NAME SERV UNIT SERVICE API API API API FILE NUMB NUFIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUF~ SAMP ELEM CODE (HEX) CFTC CNTD CPS 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1244177 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9996.500 NPHI.CNTD 29.461 NRAT. CNTD 5.000 CRAT. CNTD NCNT. CNTD 1890.694 FCNT. CNTD 378.139 CFTC. CNTD 330.171 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1400.000 CCL. CNTD -0.002 DEPT. 9623.500 NPHI.CNTD 17.926 NRAT. CNTD 3.899 CRAT. CNTD NCNT. CNTD 3879.828 FCNT. CNTD 995.174 CFTC. CNTD 868.934 CNTC. CNTD GRCH. CNTD 21.808 TENS. CNTD 1376.000 CCL.CNTD 0.030 5.079 1829.238 3.574 3808.504 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE ' FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 16 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTD $ Rb~4ARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE FOR 3 PASS CASED HOLE CNTD DATA. DATA WAS CLIPPED PRIOR TO AVERAGING. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Company Name FN PRUDHOE BAY Field Name WN D-29 Well Name APIN 50-029-21470-00 API Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section TOWN lin Township RANG 13E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN MATT KISSINGER Witness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT Depth NPHI Compensated Neutron Porosity, SS Matrix, cali & dead time corr. NRAT Raw Thermal Neutron Ratio LIS Tape Verification Listing Schlumberger Alaska Computing Center 10-JUL-1998 10:01 PAGE: 17 DEFI CRAT Thermal Neutron Ratio Calibrated NCNT RAW NEAR CNT COUNTS FCNT RAW FAR CNT COUNTS CFTC Corrected Far Detector Count Rate CNTC Corrected Near Detector Count Rate GRCH Gamma Ray in Casing TENS Surface Tension ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1244177 00 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1244177 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 18 ** DATA ** DEPT. 10005.500 NPHI.CNAV -999.250 NRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV GRCH. CNTD -999.250 TENS.CNTD 1208.000 DEPT. 9290.500 NPHI.CNAV -999.250 NRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV GRCH. CNTD 35.518 TENS.CNTD -999.250 -999.250 -999.250 -999.250 -999.250 CRA T . CNA V CNTC. CNA V CRA T . CNA V CNTC . CNA V -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION ' O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCRI~4ENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ........................... CNTD 10000.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH .......... 9300.0 9-MAR-98 8B1-129 1100 9-MAR-98 10004.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 19 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNTD COMP. NEUTRON GR GAMMA RAY $ 10002.0 9210.0 10006.0 1800.0 NO TOOL NUMBER CNC-DA CGRS-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 10004.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 9.00 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): 1.0 REM3LgKS: Tied into SWS CNL-GR log dated 22-May-1990 (The 1990 CNL is tied into BHC Sonic dated 12-6-85) Total seawater pumped prior to logging was 140 BBL GR anomaly at 9715 feet due to formation activation Tool stationary at this depth prior to logging TD tagged at 10,002 feet measured depth GOC estimated at 9902 feet measured depth Logged two fluid packed passes LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 20 Third pass showed gas above 9600 ft Four passes showed more gas Client satisfied with initial two passes to determine GOC $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Company Name FN PRUDHOE BAY Field Name WN D-29 Well Name APIN 50-029-21470-00 API Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section TOWN 1 iN Township RANG 13 E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN MATT KISSINGER Wi tness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT NPHI R TNR TNRA RCNT RCFT CNTC Depth Compensated Neutron Porosity, SS Matrix, cali & dead time corr. Raw Thermal Neutron Ratio Thermal Neutron Ratio Calibrated RAW NEAR CNT COUNTS RAW FAR CNT COUNTS Corrected Near Detector Count Rate LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 21 DEFI CFTC Corrected Far Detector Count Rate GR API-Corrected Gamma Ray TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUFiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1244177 O0 000 O0 0 $ 1 1 4 68 0000000000 RTNR PS1 1244177 O0 000 O0 0 $ 1 1 4 68 0000000000 TNRA PSi 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PSl CPS 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 GR PSi GAPI 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PSi LB 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PSi V 1244177 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 22 ** DATA ** DEPT. 10019.500 NPHI.PS1 52873.242 RTNR.PS1 RCNT. PS1 1939.394 RCFT. PS1 0.000 CNTC. PS1 GR.PS1 0.000 TENS. PSi 917.000 CCL.PS1 DEPT. 9262.500 NPHI.PS1 RCNT. PS1 4248.683 RCFT. PS1 GR.PS1 73.293 TENS.PSi 23.121 RTNR.PS1 893.572 CNTC. PS1 1429.000 CCL.PS1 -999.250 1730. 573 O. 010 4.500 3864.079 -999.250 TNRA . PS1 CFTC. PS1 TNRA.PS1 CFTC. PSi -945.389 0.000 4.272 780.221 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUM~ULqY VENDOR TOOL CODE START DEPTH CNTD 10000.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH 9300.0 9-MAR-98 8B1-129 1100 9-MAR-98 10004.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 23 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 10002.0 9210.0 10006.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... CNTD COMP. NEUTRON GR GAI~4A RAY $ TOOL NUMBER ........... CNC-DA CGRS-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 10004.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 9.00 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): 1.0 REMARKS: Tied into SWS CNL-GR log dated 22-May-1990 (The 1990 CNL is tied into BHC Sonic dated 12-6-85) Total seawater pumped prior to logging was 140 BBL GR anomaly at 9715 feet due to formation activation Tool stationary at this depth prior to logging TD tagged at 10,002 feet measured depth GOC estimated at 9902 feet measured depth Logged two fluid packed passes LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 24 Third pass showed gas above 9600 ft Four passes showed more gas Client satisfied with initial two passes to determine GOC $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Company Name FN PRUDHOE BAY Field Name WN D-29 Well Name APIN 50-029-21470-00 API Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section TOWN 1 iN Township RANG 13 E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN MATT KISSINGER Wi tness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Densit]/ TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT NPHI R TNR TNRA RCNT RCFT CNTC Depth Compensated Neutron Porosity, SS Matrix, cali & dead time corr. Raw Thermal Neutron Ratio Thermal Neutron Ratio Calibrated RAW NEAR CNT COUNTS RAW FAR CNT COUNTS Corrected Near Detector Count Rate LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 25 DEFI CFTC Corrected Far Detector Count Rate GR API-Corrected Gamma Ray TENS Surface Tension CCL CCLAmplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 6 1 1 4 68 0000000000 DEPT FT 1244177 NPHI PS2 PU 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PS2 CPS 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1244177 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 26 ** DATA ** DEPT. 10023.000 NPHI.PS2 52873.242 RTNR.PS2 RCNT. PS2 3764.706 RCFT. PS2 0.000 CNTC. PS2 GR.PS2 0.000 TENS.PS2 903.000 CCL.PS2 DEPT. 9261.500 NPHI.PS2 RCNT. PS2 4198.297 RCFT. PS2 GR.PS2 164.206 TENS. PS2 26.268 RTN-R.PS2 881.322 CNTC.PS2 1414.000 CCL.PS2 -999.250 TNRA.PS2 3359.347 CFTC. PS2 -0.019 4.946 TNRA.PS2 3608.721 CFTC. PS2 -999.250 -945.389 0.000 4.681 769.525 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMFIARY VENDOR TOOL CODE START DEPTH ........................... CNTD 10000.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH 9300.0 9-MAR-98 8B1-129 1100 9-MAR-98 10004.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 27 TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 10002.0 9210.0 10006.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNTD COMP. NEUTRON GR GAFk4A RAY $ TOOL NUMBER CNC-DA CGRS-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 8.500 10004.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 9.00 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) '. 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): 1.0 REMARKS: Tied into SWS CNL-GR log dated 22-May-1990 (The 1990 CNL is tied into BHC Sonic dated 12-6-85) Total seawater pumped prior to logging was 140 BBL GR anomaly at 9715 feet due to formation activation Tool stationary at this depth prior to logging TD tagged at 10,002 feet measured depth GOC estimated at 9902 feet measured depth Logged two fluid packed passes LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 28 Third pass showed gas above 9600 ft Four passes showed more gas Client satisfied with initial two passes to determine GOC $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Company Name FN PRUDHOE BAY Field Name WN D-29 Well Name APIN 50-029-21470-00 API Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section TOWN 1 iN Township RANG 13 E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN MATT KISSINGER Wi tness Name SON 1244177 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 70.8 Above Permanent Datum EKB FT 70.8 Elevation of Kelly Bushing EDF FT 69.8 Elevation of Derrick Floor EGL FT 42.5 Elevation of Ground Level TDD FT 10004. Total Depth - Driller TDL FT 10002. Total Depth - Logger BLI FT 10006. Bottom Log Interval TLI FT 9210. Top Log Interval DFT PRODUCED FLUIDS Drilling Fluid Type DFD G/C3 9. Drilling Fluid Density TLAB 1100 9-MAR-98 Time Logger at Bottom BHT DEGF 220. Bottom Hole Temperature TABLE TYPE : CURV DEFI DEPT NPHI RTNR TNRA RCNT RCFT CNTC Depth Compensated Neutron Porosity, SS Matrix, cali & dead time corr. Raw Thermal Neutron Ratio Thermal Neutron Ratio Calibrated RAW NEAR CNT COUNTS RAW FAR CNT COUNTS Corrected Near Detector Count Rate LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 29 DEFI CFTC Corrected Far Detector Count Rate GR API-Corrected Gamma Ray TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244177 00 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1244177 00 000 00 0 7 1 1 4 68 0000000000 RTNR PS3 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1244177 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center lO-JUL-1998 10:01 PAGE: 3O ** DATA ** DEPT. 10008.000 NPHI.PS3 RCNT. PS3 1882.353 RCFT. PS3 GR.PS3 0.000 TENS. PS3 DEPT. 9598.000 NPHI.PS3 RCNT. PS3 4687.039 RCFT. PS3 GR.PS3 18.308 TENS.PS3 5.658 RTNR.PS3 941.176 CNTC. PS3 964.000 CCL.PS3 16.747 RTNR.PS3 1265.156 CNTC. PS3 1378.000 CCL.PS3 2.000 1679.673 -0.029 3.705 3903.553 -999.250 TNRA. PS3 CFTC. PS3 TNRA. PS3 CFTC. PS3 1.892 821.786 3.414 1104.668 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/07/10 ORIGIN : FLIC TAPE NAME : 98336 CONTINUATION # : 1 PREVIOUS TAPE : COMb]ENT : BP EXPLORATION, PRUDHOE BAY, D-29, API #50-029-21470-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/07/10 ORIGIN : FLIC REEL NAME : 98336 CONTINUATION # : PREVIOUS REEL : COMMENT · BP EXPLORATION, PRUDHOE BAY, D-29, API #50-029-21470-00 uo!ss!tumo~l 'suoO se9 ~ !!0 =~se~ L96I o £ Nnf' (11A!t3t~1 ~ r.: ..f: '.r 'l' v' p F.. C ,~ ,I. i~. ~l~ ii ~! .,,,i, ii ,,r~ ,i,.,ii O, 0 () o12 U 94 00 ,'.~ 002 i)l 2 ,ii ii ,ii ,~l 0 o .t Or:,5 oe5 o 65 065 065 ut, 5 C 0 D E U65 ,~ ¥ o '/ '.i . 9 .[ 1 ~; (',' t., 2 ]. 9 9 :J 3 0 (? 0 4. 4 4 ..:~ 4 ~[, ,.~ 4 33. ,337 476. 2500 - 999,,.. '.~ 5 ," .~',", '- 9 5.} 9,2,5 v 0 -999.25oc, 3(.',, t,293 b, ,;. 7 10 ?...; R A 7 5.5 0 U O T ~'..; N $ 15.0 0 0 0 ..R ::;R q -999. 2500 ~,; -'.,¢ 9 9.25[)0 ;,,i C, :'~ I ....9 '.4 ,,~. 250 O ,.,Pr'ii ,-99'd,2500 22 o 2 ,b 5 ~', 1."), LiOUt. f 3.'31, t~(' 2'1.0',.) 2, 0 ,!,, i, 35, 4. b 52 ,~ I 0,0 <)O 0 4,, 29 30 1 't, 1 i:r: '7 5 20,.50.0000 3.09 ? 8 2.5762 4:. 0 J 5 ~;, ..... 2~. 1,699 8,0 0 4,2187 0. U i'~ U {: .~. 3984 b 3:') O, 22 4.., 0 ~.,. 2 b 3.9 I,;tl, 476.?. 09 :)w 38't .7t~03 ]. U. O,,} U t: :~RA r r,i (,:: ~ 3 :t,. 2500 q 'l 6,0006, 4.S828 i i), {,~ 000 ~. 4297 ]. e,. 1, 71. 9 4, 7 b, t) 00 0 980.0000 2.91 80 10,0000 i2,3~38 ~.'., 228, O00 0 lq., 3555 1 0.90UO 3.9512 1.2bb. OOC, O 10.0000 ~.7~13 ,:15.3436 4't52.u000 22.11~1 1 ~. OoOu 1.5273 10. OOO0 ?'). ,'~760 4d. O93b 2588, UO00 2 5 1 6.0 0 0 0 55.5170 347.0 {]' 00 7. ~ :L 25 ..I, 0.0 L',, O 0 6,76'17 4: 2, ,~ 750 h, P H i ':'; R A T b'J. 662,1. 34t;. 2500 -999,2500 -999 2500 -.,ggg' 25U0 40. 5625 27 ~4 . -99~'2500 -999.25O0 ~ ]r,Y L-:;L,,~, ...... !. e.;i. fH ¥ 1 t) 13 '/, 910 [..~ C C L - 999,250 gPT 1010!}, 25U0 CCh 1, 00 00 o 25 i; u C C t, 9'909. 250{! CCL 9 700 · ;2 b t) f,2 C C b 9 ~ 0 0,2 5 C' ',i, Cf,,', C l'., 9 q, {) V. 25 ,,; ,.) (' C L O. (! f~. f" 0 I (} 24 i). 0000 CC[~ 4 4 i. 4 -, 999.2 !5 o U C C k, 0.00o0 CCh u, 0 ~,) O 0 C. C g t). 0 :) 0 0 C C b o, 030 ~.,~ C C L 0,0 0 0 0 C C b 0, Ot:~ O0 CCL v. (, {.', O 0 C C L -999,25~)0, CCL '999,2500 O,OOOO O,O000 0,0000 9,OOUO 0. 0000 O,O000 U, OOOO g,O000 0,0000 0. gO00 RECEIVED JUN - ,5 1990 ~Oil ,& Gas Cons. Commir~i~ '' 'Anchorage ~P EXPlOrAtION ~UDHOE'BAv -~ : ~9~029-214 IS TaPe Verification ListinO :hlumberger. Alaska ComPutin~ Center 30-MAY-1990 18:04 )*** REEL H£ADER *)** $~RVICE NA~E : EDIT DATE : 90/05/30 O~IGIN : FLIC ~EEL NA~E : 73886 CONTINUATION # : PRE¥IOU$ REEL : COMMENT : BP E×P!..ORATION,PRUDHOE SAY,O-29 (14-13-I1-13),50-029-21470 SERVICE NA.~E : EDIT DATE : 90/05/30 ORIGIN : FLIC TAPE NAME : 73886 CONTINUATION # : ! PREVIOUS TAPE : CO~ENT : 8P EXPLf)RATION,PRUDHOE BAY',D-29 (~4-13-11-'13),50-029-21470 **** FILE HEADER FILE NA~E : EDIT .OO1 SERVICE : FLIC VERSION : 001A04 DATF : 90/05/30 MAX REC SIZE : 1024 FILE TYPE : LO L~ST FILE : PAGE: ******************************************************************************* ** ** SCHLUMBERGER WELL SERVICES ******************************************************************************* ******************************************************************************* COMPANY NA~E: BP EXPLORATION WELL: D-~9 FIELD: PRUD~OE B~Y ~OROUGH: NORTH SLOPE STATE: ALASKA AP1 N{]~BER: 50-029-21470 LOCATION: 1955' FSL & ~067' FWL SECTION: ~3 TOWNSHIP: lin RANGE: 13E PERNANENT DATUm!: ~$b ELEVATION: O' LaG NEASURED FR~ KB 70.8' ABOVE PER~ANENT DATUN IS Tape Verificat.ion [,istinq cblumberqer Alaska Comput:.img Center 30-~AY-1990 18:04 PAGE: ELEVATIO~.~S DATE LOGGED~ TD DRILLER: TD LOGGE~: CASING 2: KB: 70.8' DF: 69,8' GL: 42,5' 22-~AY-90 10000' 1.0044' b ~ 47 LB ~ DRILLF~R ,DEPT~ OF 0,' TO 9389[ 7" 29 LB ~9. DRILLER DEP~H' OF 9100 TO 10165 4 1/9" IP, 6 LB ~ DRILLER DEPTH OF O' TO 9166' BIT SIZE ~: ~,2 1/4" BIT SIZE 9: LINER BIT SIZE 3~ TUBING TYPE FLUID I~ }~ODE: PRODIICED FLUIDS TI~E LOGGER 0~ BOT~O~: 13:57 2~-~.AY~90 50GGING DISTRICT: PRUDHOE BAY LOGGING ENGINEEr: T, WEST ~ITNESS: WHITLUW / JENKINS TOOL NUmBeRS: ATC-CB-X~5~ NS~ LA 3039 CAL UB 299 TIE-IN GO BHCS ~AT~D 12-6-85, CNC DA 146 ATM-AA-374 WEb5 SHUT IN FOR bOGGING A'I ApPROX. 09:00 22-MAY-90 SIWHP = 700 P$IG DATE JOB STARTS;D: 2g-MAY-90 jOB REFERENCE ~0:73886 bDP/ANA: R, KRUWELL FILE - EDIT,O0! BP EXPLORATION PRUDHOE BAY D-29 C14-13-11-13) 50-029-21470 "2 1/2" CASED HOGE C~IL PASS #1" ;S Tape verification Listlnq ~hlumberger .lasKaA Computing Center 18:04 DATA SAMPLED EVERY ',5o00 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NA~.E CNT-A/D/H ,PS1 CO~fPENSATED NEUTRON PAGE: TABLE TYPE : CONS TUNI VALU DEFI CN BP EXPLORATION Cgmpany Name FN PRUDHOE BAY FieldName D-29 (14"13-11-i3) ~e!l Name, APIN 50-029-21470 AP! Serial Number FL 1955' FS5 & 1067' FWL Field'.Location SECT 23 Section TOwN iiN Township RANG 13E Range CGU~ NORTH SLOPE County STAT aLASKA Stale or Province NRTI USA Nation WITN WHITLOW / JENKINS witness' Name SON 391122 Service order Number PDAT NSL Permanent datum EPD FT L~F .KB Log Measured From APD FT 70,8 E~B FT 70,8 EDF FT 69,8 ESL FT 42,5 TABLE TYPE : CURV DgPT [)epth Channel Name NPHI Neutron Porosity TNRA Calibrated Thermal Neutron Ratio RTNR Raw Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma Ray TENS Tension verification blstin~ lumberger A. las~a computing Center 30-MAY-1990 lB:04 CCL CCL AmPlitude PAGE{ ** DATA FORMAT SPECIFICATION RECORD ** SEI TYPE - 64ES *$ TYPE REPR CODE VALUE 1' 66 0 2 66 0 3 73 44 4 66 5 66 6 73 7 65 9 65 , 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 NAME SE I NPHI PS TNRA PS RTNR PS RCMT PS RCFT PS CNTC PS CFTC PS GR PS TENS PS CCL PS ** SET TYPE - CHAN ** RV UNIT SERVICE API API API AP! FILE NUMB NUMB SIZE REPR PROCESS D O~DER # bOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) .... ",'"'"'",,",,'"'"'"'"""",'"','"'"'"'"'"'"" 39112 O0 0 O I 1 , 68 000000000 PU 39 000 O0 0 I 1 1 4 68 0000000000 I 1122 00 1 391122 00 000 00 0 I 1 1 391122 00 000 00 0 1 1 1 CPS 391122 00 000 00 0 1 1 1 CPS 391122 00 000 00 0 1 1 1 CPS 391122 00 000 00 0 1 CPS 391122 00 000 O0 0 I 1 1 GAPI 391122 00 000 00 0 I 1 1 LB 391122 O0 000 O0 0 1 1 1 V 391122 O0 000 00 0 1 1 4 68 0000000000 1 4 68 0000000000 1 4 68 0000000000 1 4 68 0000000000 I 4 68 0000000000 I 4 68 0000000000 ! 4 68 0000000000 1 4 68 0000000000 1 4 68 0000000000 ** DATA ** ~S Ta~e Vertftcation Listing :hlum erger Alaska Computln~ Center DEPT, 10100 000 NPHImPS{ R.C~T.PS1 '999' ,250 RCFT,P$X GR.,PS1 48,844 TENS,PS! 1oooo ooo RCNTiP$1 2386:108 RCFT,PS1 GR.P$1 26,]44 TENS.PSI ~C~T!PS.i 31 ,896 RCFT,PSl G~ PSI 16,000 T~NS,PS1 DEPT 9800.000 NPHI,P$1 RCNT!PS1 4669,388 RCFT..PS1 GR PSi 16,500 TENS'PS! DEPT, 9700,000 NPHI.,P$1 RCNT.PS1 5766.667 RCFT GR..PSi 15.563 TENS:IPS1 PSi 9600.000 NPHI'P$1 DEPT'Psl 4700,000 RCFT.PS! RCNT. GR.PS1 30.766 TENS..PSI DEPT 9500 000 NPHI.PSi RCNTiPSI 4166:666 RCFT.P$1 GR PS1 '30.203 TENS.PS1 DEPT 9400 000 NPHI,P$1 RCNT:PSi 1966:667 RCFT,P${ GR.PSl 53.1.56 TENS..PS1 DEPT 9313.500 NPHI.PS1 RCNT'PS1 1900.000 RCFT.PSX GR:PS1 -999.250 T£NS.P$1 END OF DATA FILV NAME : EDIT .001 SERVICE : FLIC VER$IO~ : 001A04 DAT~ : 90/05/30 sAX REC SIZE : ~024 FIbE TYPE : bO LAST FILE : 30-MAY-1990 18:04 -99 . 50 -999. 50 .]8.797 4 3,333 1205.000 621. 2 1185.000 '17,730 ~405.5~6 1200,000 12,242 2181,062 1160,000 1360, 5 1:145,000 18,818 1233-333 1140.000 ~5 ~95 2~9i 54 1140 O0 49.584 283,333 1135,000 TNRA,P$1 CNTC, TNRA,'PSX CNTC,PSX CCb,'PSl TNRA'ePS1 CNTC,PS1 COb,PS! iTNRA,P$1 CNTCePSl CCS,PSl TNRA'PSI CNTC,'PSl CCS,PSX TNRA,P$! CNTC,P$! CCL,PSl :TNR.A,P$X ,CNTC,P$! CCB,PS! TNRA,'P$1 CNT:,PSl 'CCh,PS1 TNRA.PSl CNTC.PS! CC~.PS! '99 ,250 -999,250 '0 000 0 000 ,622 0.000 628~ '"701 ,941 0.000 490~ 29 0,000 ~3594 469! 753 0 000 000 7.276 2129.091 0,000 RTN l CFTC,PSi RTNR!'P$X CFTC.PSi CFTC,PS1 RTNR'PS1 CFTC.PSi RTNR,PS! 'CFTC.PSi RTNR,'PSI CFTC,PS/ RTN~.P$1 CFTC,P61 RTNR,PS1 CFTC,PS1 ':'999,250 "999,250 , 5,263 694,095 ~,580 ,425 3,324 :1280,705 7.059 ~41.623 6,824 293.973 Tape Veri~ication r,.lsti, ng :hlumbero.'erAla$'~a Com~utln~ Center **** FILE H'~ ADER **** FiLE NAME : EDIT ,002 $~RVICE : FLIC VERSION : O0 1.AO,4 DATE : 90/05/30 ~AX REC SIZE : 1024 FILE TYPE : bO I,.,~ ST FILE : 30'MAY-1990 18:04 PAGEs ****************************************************************************** FILE - EDIT,O02 BP EXPLORATION PRUDt{OE BAY "2 1/2" CASED MOLE CNb PASS ~2" DATA SAMPLED EVERY-,5000 FEET DATA INCLUDED TOOL £XTENSION TYPE USED CNT-A/D/H ,PS2 TOOL COMPENSATED ~iEUTRON ****************************************************************************** T A BI.,.E TYPE TONI VALU DEFI CN BP EX b P ORATION Company Name Field Name FN PRUDHOE BAY WN D.29 (14-13-11-13) Well Name APIN 50-029-21470 AP! Serial Number FL 1985' FSL & 1067' FWb Field Location SECT 23 Section TOWN lin Township RANG 13E Range COUN NORTH SLOPE County STAT ALASKA State or Province MATT USA Nation ~ITN ~HiTLO~ / JENKINS Witness' Name Tape verification bisting :blumberger AlasEa Computin~ Center 30-~AY-1990 18104 .PAGE: SON 391122 Service Or,er Number PDAT ~Sb 'Permanent datum LPF hOg Measured From APl;) FT 70,8 ' EKB FT 70,8 EDF FT ~ TABLE TYPE ~ CURV $EFI ......... DEPT Depth Channe! Name NPHI Neutron Porosity TNRA Calibrated Thermal Neutron Ratio RTNP Raw Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC G~ Gamma Ray TENS Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** 2 66 0 3 73 44 4 66 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 23 12 68 I3 66 0 14 65 FI 15 66 68 16 66 0 66 :hlUm erger Alask:a Computing Center 30-MAY-1990 18:04 ,** SgT TYPE NAME SERV UNIT SERVIC ID ORDER D~PT FT 391122 O0 000 O0 0 2 NP~I PS2 Pt,! 391~22 O0 000 00 0 2 TNR~ PS2 391~22 00 000 '00 0 2 RTNR PS~ 391122 O0 000 00 0 2 RCNT PS~ CPS 391122 O0 000 00 0 2 RCFT PS~ CPS 391122 00 000 00 0 2 CNTC PS2 CPS 3911~2 00 000 00 0 CFTC PS2 CPS 3911~2 00 000 00 0 2 GR PS2 GAP! 391122 00 T~:~N~. PS2 bB 39 CCL PS2 V 39 CHAN AP1 API A. PI AP1 FILE NUmB NUMB SIZE REPR PROCESS LOG TYPE CLASS MODNU'MB SAMP ELEM CODE (HEX) 000 O0 0 2 1 I 4 68 0000000000 o! ooo ooo!!ooooo 2 0 000 , ! 4 000 00000 ** DATA ** DEPT 10053,000 NPHI,PS2 RCNT:PS2 3049.555 RCFT,PS2 GR,.PS2 57.344 TENS.,PS2 DEPT. t0000,000 NPMI,P$2 RCNT,PS2 2355,828 RCFT,.P$2 GR.PS~ 29,594 TENS,P$~ DEPT. 9900.000 NPHI.P$2 RCNT P$2 3174.349 RCFT P$2 GR:PS2 ~9,156 TENS:PS2 DEPT. 9800 000 NPHI PS2 RCNT,PS2 4585'.170 RCFT:P$2 GR,PS2 16.734 TENS.PS2 DEPT. 9700.000 NPHI.PS2 RCNT.P$2 5783.890 RCFT,PS2 GR.PS2 16.078 TENS.PS2 DEPT 9600.000 NPHI.P$2 RCNT:PS2 454~.549 RCFT.PS2 GP.PS2 33.250 TENS.PS2 DEPT. 9500.000 NPH1,PS2 RCNT.PS2 4275.049 RCFT.PS2 GR.PS2 34,375 TENS.PS2 DEPT. 9400.000 NPHI.PS2 RCNT.PS2 1955,912 RCFT.PS2 G~.PS2 50,563 TENS.PS2 28,140 TNRA,PS2 4 816 RTNR,PS2 950,000 CC~,P$2 0;000 37,197 ~N~A,P$2 5,883 RTNR,PS2  PS 634,805 ,'P$2 ,000 CC5, 0.000 . 29,i40 TNRA,PS2 4,939 RTNR,PS2 628,684 CNTC,PS2 3497,057 CFTC,PS2 1200,000 CCL,PS2 0,000 16,950 TNRA,PS2 3,342 RTNR,PS2 1361 ~61 CNTC,PS2 5050,646 CFTC,PS2 12~5:00 CCL,PS2 0,000 12 437 TNRA.PS2 2,728 RTNR,PS2 2132:265 CNTC,P$2 6348,25i CFTC,PS2 1185,000 CCh,PS2 0,000 23,581 TNRA,P$2 4,'233 RTNR,PS2 1058,116 CNTC,PS2 4978,5~7 CFTC,PS2 1145,000 CC5,PS2 0,000 18,468 TNRA,PS2 3,547 RTNR,PS2 1195,674 CNTC,PS2 4766,0]7 CFTC,PS2 1145,000 CC~,PS2 0,000 44,706 TNRA,PS2 6,718 RTNR,PS2 352,352 CN~C,PS2 2247,337 CFTC,PS2 1165,000 CCS,PS2 0,000 6,000 446.881 5150 723~958 3,365 1512.177 2,647 2275,645 4.485 1227,825 3,553 1320,499 6.273 360.896 Tape Verification Listing ~hlumberger Alaska Computing Center ~0-~A¥-1~.990 1~:04 PAGE~ DEPT. 9323,000 NPHI.P$2 RCNT,P$2 1857,858 RCFT,P$2 GR.PS2 37,375 TENS,PS2 END 0F DATA 50.735 TNRA,PS2 272.545 CNTC,PS2 1140,000 CCL.PS2 7,408 ,.2092,808 0,000 RTNR,P$2 CFTC,PS2 7,059 284,639 **** FILt TRAILER FIL~ NANE ~ EDIT ,002 SERVICE t FLIC VERSION : 001A04 DATE : 90/05/30 ~X REC SIZE ~ i024 FILE TYPE : 50 LAST FILE **** FX. LE HEADfR FIL~ NA~E ~ EDIT ,003 SERVICE : F~IC VERSION : 00ia04 DATE : 90/05/30 ~AX REC SIZE : 1024 FIbE TYPE ~ LO LAST FILE ****************************************************************************** , FXLE ' EDIT,O03 BP EXPLORATION PRUOHOE BaY 50-0~9-2~470 "2 1/2" CASED HOLE CNL PASS #3" DATA SAMPLED EVERY -,5000 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NA~E CNT-A/D/H COMPENSATED NEUTRON £S rathe Verification Listinq ~hlumberger ~Iaska Computln~ center T;~BLE TYPE ~ CONS TUN! VA[,U ,,DEFI , : CN _P EXPLORATION ,Company Name F~ PR~DHO~, B~Y Flel~ Name W~ p-29 (14-13-11,-~,3) Well ~ame A. PI:N ~:0'029'21470 AP! Serial Numbe:r FI, 1985' FSb & 1067' FWL 'Field 5ocatlon SECT 23 Section TOWN I1N ,Townsh,l~ RANG 'i3E Ran COUM NORTH ibOPE Cou~e ty STAT ASASKA State or Province NATI USA Nation WITN WHITLOW / jENKINS Witness' Name SGN 391122 Service Order Numb:er PDAT MSL Permanent datum EPD FT 0 LMF K~ 5oq ~easured From APD FT 70,8 EKB FT 70,8 EDF FT 69,8 EG5 FT 42,5 TABbE TYP~ ~ CURV DEFI EPT epth Channel ame NPHI Neutron Porosity TNR~ Calibrated Thermal Neutron Ratio RTN~ Raw Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma Ray TE~$ Tension CCh CCh Amplitude ummerqer AlasKa ~°mput:iLng Center 30-NAY'1990 1B:04 DATA. FORMAT SPECIFICATION RECORD** SET TYPE - 64EB **, TYPE REPR CODE VAbUK 1 66 0 2 66 0 3 73 44 4 66 5 66 6 73 7 65 8 68 0.5 9 65 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 I ** SET TYPE - CHAN ** NAMR] SERV UNIT SERVICE AP1 .APl APl AP1 FILE NUMB NUMB SIZE REPR PRUCESS ID ORDER # 60G TYPE C6A$$ MOD NUMB 'SAMP ELEM CODE (HEX) ------------------------;------------------------;--------------------~-------~--D~:P FT 391122 0 000 O0 0 ~ I 4 68 000000 NPHI PS3 PU 391122 O0 000 O0 0 3 I I 4 68 0000000000 TNRA P$3 391122 O0 000 O0 RTMR P$3 391122 O0 000 O0 RCNT PS3 CPS 391122 O0 000 O0 RCFT PS3 CPS 391122 O0 000 O0 CNTC PS3 CPS 391122 O0 000 O0 CFTC PS3 CPS 391122 O0 000 O0 GR PS3 GAPI 391122 O0 000 O0 0 3 0 3 0 3 0 3 0 3 0 3 0 3 1 1 4 1 I 4 1 1 4 1 I 4 1 1 4 1 1 4 1 I 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 PAGEI 1! ** DATA ** DEPT. 10049.500 NPH~iPS3 ~CNT.PS, 305~ 284 RCF PS3 GP.PS3 5:844 TEN P$3 DEPT, 10000,000 NPHI,PS3 RCNT,PS3 2366,667 RCFT,PS3 GP.PS3 2B,641 TENS.PS3 27,967 TNRA,PS3 654.2~5 CNTC,P$3 795.0 0 'CCh,PS3 40,335 TNRA,PS3 41~,667 CNTC,PS3 123 .000 CCh,PS3 4 794 RTNR,PS3 3363:301 CFTC.PS3 0.000 6,230 RTNR,P$3 2673,977 CFTC,PS3 0,000 4.667 701,499 5,840 431,639 £S Tape verl,~ication Listing :hlomberger AlasKa COmputlng Center DEPT, 9900,000 NPHI,P$3 RCNT,PS3 3200,000 RCFT,P$i GP.PS3 18,563 DEPT 9800,000 NPHI,PB3 RCNT:PS3 4633,333 RCFT,PB3 G~.PS3 15,891 TENSmPB3 DEPT. ~700.000 N'PHI,PS3 RCNT.PS3 833,333 RCFT.PS3 GR,PS3:19,578 TENS.PS3 DEPT 9600,000 GR,PS3 26,844 TENS,PS3 RCNT,PS] 4200,000 .RCFT, GR.PS3 32,7~9 DEPT. 9400', 000 NPMI, G ,,PS 52.438 =TENS,PS3 DEPT. 9322 ~CNT.PS3 1904:000 NPHI,PS3 357 RCFT.PS3 GR.PS3 44.719 TENS.PS3 ENO OF DATA **** FIL, E TRAILER ***~ FILE NAME : EDIT .,003 SERVICE : FblC VERSION : 00lA04 DATE : 90/05/30 MAX REC SIZE : 1024 FILE TYPE : bO L~$T FIhE : **** FILE HEADRR **** FILE NA~E : EDIT ,004 SERVICE ~ FLIC VERSION : 00lA04 DATE : 90/05/30 M~X REC SIZE : 1024 FILE TYPE : LO LAST FILE : 30-MAY-lg90 18{04 31,!09 TNRA,PS1 633, 3,3 .CNTC,PS ,1200., 00 :CCL.PS :1.6.~i TNRA P$3 1462, CNTC~P$ .: ,417 :CNTC,'PS3 1210,000 CCb,PS~ 1~8 * 'CNTC,PS3 1 40, 0 CCL,PS3 18'001 TN'~A,PS3 1298,647 CNTC,PS3 I165,000 CCL,.PS3 PS 11 ,000 CCh,PS3 5~.408 25 .048 CNTC, ~120.000 CCh. PS3 5 23s 3473!756 0 000 3334 5085i142 0 000 2.669 000 3,484 4630,915 .0,000 6'7 8 2327,713 0.000 7,600 2135,375 0,000 RTN'R.PS3 CFTC.PS3 RTNR,PS3 CFTC.PS3 RTNR:.PS3 CFTC.PS3 RTNR,P$3 CFTC,PS3 RTNR,P$3 CFTC,PS3 RTNR,PS3 CFTC,'PS3 RTNR.P83 CFTC,PS3 5 053 3,163 1523,318 :233~ '504 ,875 3*325 1444.068 I33~ '256 ,825 , 6,500 356,228 7.600 277.660 Tape Veri~lcatJ..on Listing :hlumberger Alas~.a computing center 30-MAy-1990 18:04 ¸13 FiLE "2 1/2" CASED HOLE CNL PASS #4" DATA SAMPLED E'V. ERY -,5000 FEET DATA INCLUDED- ToOL EXTENSION TOOL, TYPE USED NAME CNT-A/D/H .,PS4 COMPENSATED NEUTRON TABLE TYPE : CONS TONI VALU DEFI C BP EXPLORATION 'Company Name F~: PRUDHOE BAY Field Name WN D-29(14-13-11-13) Well Name APIN 50-029-21470 APl Serial Number FL 1985' FSL & 1067' FWL Field Location SECT 23 Section T~W~ lin ~ownship RAN~ 13~ Range COON NORTH SLOPE County S~AT ALASKA State or Province NATI USA Nation WXTD WHITLOW / JENKINS witness' Name SON 391122 Service Order Number PDAT ~SL Permanent datum EPD FT 0, LMF KB Log Measured From APD FT 70,8 E~ FT 70,8 ED~ FT 69,8 EGL ~T 4~,5 :l~lumt~erqer . as{ca Computl. n center 30-MAY~1990 18:'04 TABLE TYPE { CUR¥ DEPT Depth ~Channel Name NPH! Neutron Porosity . TNRA Calibrated Thermal Neutron Ratio RTN~ Raw Thermal Neutron Ratio RCNT ~ RCNT RCFT RCFT CNTC C~TC CFTC CFTC G~ Gamma Ray 'rEN~ Tension CC~ CCL AmPlitude PAGE~ :14 DATA FORMAT'SPECIFICATION RECORD'** ** :SET TYPE -,64~B ** T¥'P~ ~EPR CODE VAbUE I 66 0 2 66 0 3 73 44 4 66 5 66 6 73 7 65 8 68 0,5 9 65 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 o 66 1 ** SET TYPE - CHAN ** NAFE SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) '''''''''''F''''''''''''''''''''''DEPT 391122 O0 .... O0 ''''''''''''''''''''''''4 1 1 4 ....... 68 '''~;'~;''''000 0 O0 NPHI PS4 PU 391122 00 000 00 0 4 1 1 4 68 0000000000 TNR~ PS4 391122 O0 000 O0 0 4 1 1 4 68 0000000000 RTNR PS4 391122 O0 000 O0 0 4 I 1 4 68 0000000000 RCNT PS4 CPS 391122 O0 000 O0 0 4 1 1 4 68 0000000000 RCFT PS4 CPS 391122 00 000 00 0 4 1 1 4 68 0000000000 :hlumberqer A. las~a Comput:~n~ Center )O-MAY-lg90 18:04 NAPi£ SERV [,INIT SERVICE AP1 APi API API FibE NUM:B NUMB SIZE REPR PROCESS ID ORDE~ # 50G TYPE CbAS8 MOD,NUMB 8AMP ELEM CODE CHEX) CNTC PS4 CPS 391122 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC PS4 CPS 391122 O0 O00 O0 0 4 ,1 1 4, 68 0000000000 GR P$4 GAPI 391122 O0 000 O0 0 4 .1 1 4 168 0000000000 TENS P$4 LB 391122 00 000 00 0 4 ! 1 4 68 0000000000 CCL PS4 ¥ 391122 O0 000 00 0. 4 ! 4 68 0000000000 ** DATA ** D~PT, !0063'500 NPHI,PS4 2~,$91 TNRA,PS4 4,533 RTNR,P$4 RCNT,P$4 2977:667 ~CFT,P$4 67~,938 CNTC.PS4 3280,007 CFTC,PS4 G~P$4 58,063 EN$,PS4 835,000 CCh,PS4 0,000 DEPT., 100~,000 NPHI,P$4 3~.0.~:7 :TNRA.P$4 5.~'5 RTNRe'P$4 RCNT,PS4 25 ,000 RCF~,:P$4 40 ,580 CNTCeP$4 2699, ~4 :CFTC.'P$4 GR,P$4 27,484 TENS,.~$4 ':!265,000 ~C~,,~$4 0,000 , RCNT,PS4 3~66.667 RCFT,PS4 ~v~, :CNTC.,P~4 35~3,4~8 CfTC.PS4 GR,PS4 19,094 TENS,PS4 1225,000 CCh,PS4 0,000 DEPT, 9@00,~00 N:P~I,PS4 17.266 TNRA,P$4 3,384 RTN~,PS4 RCNT,PS4 4445, 53 RC T,PS4 1421,859 CNTC,PS4 5053.7~4 CFTC,PS4 GR,PS4 21,047 TENS.PS4 ~05.000 CCL,P$4 0.000 RCNT:P$4 .5835.671 RCF P$4 208 : 96 CNTC,P$4 63B7. CFTC:PS4 DEPT 9600,000 NPHi.P$4 2! ~53 TNRA,P$4 3 920 RTNR.:,.PS4 PCNT:PS4 415~.~74 RCFT,P$4 t144:.24 CNTC,P$4 4703:295 CFTC.PS4 GP.PS4 37,935 TENS,PS4 ~90,000 CCLeP$4 0.000 DEPT 9500,000 NPHI.P$4 17 808 TNRA.P$4 3.458 RTNR.P$4 RCNT:PS4 4249,233 RCFT,P$4 ~29!:~3 CNTC.PS4 4728,838 CFTC.PS4 G~,P$4 29,03! TENS,PS4 t~30,O00 CCL.PS4 0,000 DFPT 9400,000 NPHI,P$4 52,375 TNRA,PS4 7 596 RTNR.PS4 ~CNT:PS4 ~995,9X9 RCFT,P$4 3~0.52! CNTC.,PS~ 2~97:246 CFTC,PS4 GP,PS4 50,938 T£NS,PS4 1150,000 CCL,P$4 0,000 DEPT. 9308 000 NPHI,P$4 b1.8~8 T~;RA, P$4 7.540 RTNR,PS4 RCNT,PS4 [830:439 RCFT.P$4 26~,224 CNIC,PS4 1979,804 CFTC,PS4 GP,PS4 47,250 TENS,PS4 1150,000 CCL,PS4 0.000 72 ,653 5,B40 455,765 4,82! 698,369 3. 264 1.489:451 2,~97 2331. 70 4.057 1267,513 3.241 1335.152 6,947 315,426 6,875 270,253 END OF DATA IS Ta~e Verification Listing chlumberger,,~, lasKa Computing Center **** 'FILE TRAILER **** FIbE NA~E : EDIT .004 SERVICE : FblC VERSIOM : O01A04 DATE I 90/05/30 MAX REC SIZE : 1024 FILE TYPE ~ bO bAST FII, E ~ **** FILE HEADER **** IFil, I: NAME : EDIT ,005 SERVICE ~ FLIC VERSION : 001204 DATE : 90/05/30 MAX REC SIZE : 1024 FILE TYPE : bO LAST FILE : ]O-MAY-1990 18~04 PAGE: 16 ******************************************************************************* * FiLE - EI)IT,O05 , * BP EXPLORATION PRUDHOE BAY * D-29 (14-13 11-13) * 50-029-2147; , , , , , , , , , , ****************************************************************************** "HODGES LEHMANN AVERAGED NPHI FROM 4 PASSES OF CNb" DATA SAMPLED EVERY -.5000 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NAME CNT-A/D/H ,HLA CONPENSATED NEUTRON TABLE TYPE : CONS TUNI VAbU DEFI CN ~P EXPLORATION Company Name FN PRUDHOE BAY Field Name Tape Verification bistlng :hlUmberger Alaska Computln~ center TONI VALO DEFI i 985' F 5 & 1067' FWL Field bocation SECT 23 Section ,TO~ llN Township RANG 13E Ra. nge COU~ NORT}~,i SLOPE Cou6ty STAT AbA, SKA State or PrOvince ~,ATI IJSA Nation WI'TS~ ~HITSOW / JENKINS Witness' Name So~ 391122 Service Order Number PDAT ~SL Permanent datum EPD FT O, L~F KB bog ,~easured From APD FT 70,8 E~B FT 70,8 EDF FT b9,8 EGL FT : 42,5 . TABLE TYPE : CORV DEFI DEPT Depth Channel Name NPH! Neutron Porosity ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE VALUE 1 66 0 2 66 0 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 Verification List ng ChlumbeTger AlasKa ,Comput nO .Center :30-~AY"!990 1,8{04' · , 0 66 1 ** SET TYPE.- CHAN,** ..... .: , ,. , N~E SERV (INIT S~,~VICE APl iPI APl iPI FiLE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE.CLASS MOD iNUMB SAMP ELEM CODE (.HEX) DEFT F'T 391122 O0 000 O0 0 5 '1, 1 4 68 0~00000000 ~PHI HLA PU 391122 O0 000 O0 0 '5 1, 1 4 68 OvO0000000 ..PAGE~ ** DATA ~* DFPT, 10099,500 NPHI'HLA 30,420 DEFT, 10000,000 NPHI,HLA 38,574 DEFT, 9900,000 NPHI,.HLA "30,176 DEFT, 9800,000 NPHI"HLA 17,1~9 D~PT, 9700,000 NPHI,HLA 12,256 DEFT. 9600,000 NPHI,HLA 20,801 DEPT. 9500,000 NPHI,HLA 18.262 DEFT, 9400.000 NPHI,HLA 45,410 DEFT, 9307,500 NPHI,HLA 0,000 END OF DATA **** FILE TRAILER **** FTL~ NA~E : EDIT .005 SFR¥ICE : FLIC VERSIO~ : 001A04 DATE : 90/05/30 ~AX REC SIZE : 1024 FILF TYPE : LO LAST FILE : IS Ta~e Verification Listing :hlumbergerAlaska Compl~ting Center 30-HAY-19go I8:04 PAGE: 19 **** TAPE TRAIbER **** SERVICE NAME : EDIT DATE : 90/05/30 ORIGIN TAP~ NAME : 73886 CONTINUATION { PREVIOUS TAPE COM~EN'T : BP E×PLORATION,PRUDHOE BAY,D-29 (14-13-11-13,),.50-029-21470 **** REE5 TRAILER **** SERVICE NAME : EDIT DATE : 90105130 ORIGIN' : FbIC REEl, NAME : 73886 CONTINUATION # PREVIOUS REEb : COMMENT D~RECT LOGGING COMPUTER PROCESSED C o m p .~ n ~.., S 0 t.-110 ~ L AS K A P E T R ~"~ L E U M C 0, F' i e 1 d P R U D H 0 E B A Y OF' .JOB: t ;:_.'- 06-85 r': o u n ~':, I'.10 R T H~:,'" L 0 F' E State ~L"" ..... F/.:, F. H C:,-, u n t r. F' U S A CL Z ENT FORMAT DATA ]'APE LOG I N F 0 R M A T I 0 N o T A N D A ~< F 0 R M A T ( L I L ~ , o . APE R E C: 0 R D S RECEIVED Alaska Oil & t-;~,~ Cons. Commission HEA[, :,E.R RE, ,, P a g e '~ ~-' -' .7 " ,.7 t i n u a i:. ' o ~+ 0 '{ ~...,;-i'2,..~26 OF.:i. gin: Re:e.i name: 048,"'"~. .. or, :H,: :4< :~ $ :{~ :.lc :4': :~': :'1': :4~ :,~ :'I': $ $ :+: :4< :+: $ :,~ :+: :+: :-lc omr'vice name: =.:_,SFO't Pr'.ev i,:,u:-; tape F:, a t ,!.z: 85 ," i c, ,' o,...", 0 r". i i n: ,=,. ,=._ g Tap,=:: name: ..'30,487,4 L': o r', t. i n u .._=~'b i o n :~4:: 0 i Commmr',ts: H E A D E R R E C: 0 R D ,S Vet'.sCot, ~: MNEM Wfi COUN STAT CTR¥ SECT TOWN EKB EDF' EGL PD LHF DHF RUN LCC SON LUI',i Fi_ LUL ENGi WI TN DD DL TLi 8Li TCS TLA8 8HT MRT MT MSS H V i S Rhi RHF hiF',~ ~ MFSS R M C: biCST MCSS INFORMAT'I ON RECORDS C 0 f-I T E N T S .:.uHIO ALASKA PETROLEUH CO ....... [:, 2 9 (" i4.-i:3 .... 'Ii i:3'.~ L,.'H PRUDHOE 8AY [:,ATE OF JOE:~ i2-ue,--:~5 ................ MORTH SL. OPE ......... ........................... ALASKA .................................... US A i it',l 7'0,84. 0 ~':,g S4O O, 000 MS KB .............. ............ ,., 0487,4 76 i '~' NORTH SLOPES ......... , NO R'l'l.4 SLOPE 0 L S 0 N S C i.4 M 0 Y E F.'. iOiTO,O00 i 0i88, OOO 9300, O 00 , o,- , O00 f-':, ;300 't S, i 50 ,-~,, 000 ....................................... GEL .......................... FLOijL Z i'-iE ................................. .39,000 ................................................. 2,770 ................................................... 2,820 ................................................... :S 9,000 .................................................. !'i E A S U R E [:, ............................................ 2,900 69.000 .................................................. i'iE~S LiR EC, , ........................................... U Fi i 'r T Y P E C: A T G SiZE C: 0 D E 0 0 4 0 6 5 0 0 ,-t. 0 E, 5 0 0 4 0 6 5 ' 0 0 2 0 6 5; 0 0 2 0 E, 5 0 0 2 0 6 5 0 0 2 E, 5 0 0 .,:~ 65 0 0 :3 ,S 5 F T 0 3 4 ,'-', 8 F 'f' 0 3 4 68 t"-' T 0 .'7 '"[ 68 0 73 '2 65 0 S 2 E, 5 0 0 2 '? 9 0 fi :.'2 7 9 0 O 10 65 0 0 i0 r.:', 5 0 O 2 0 65 0 0 20 e':, 5 0 0 ,='":' 0 65 0 0 20 65 F T 0 .Si 4 6 8 F T 0 3 ,:i. E, 8 F T 0 3 4 6 8 i-- T 0 3 "~ ~'-', 8 H R 0 2 4 6 E: H F..: 0 'i- 4 68 D E 6 F 0 t 4 F, 8 D E G F 0 I 4 6 F; I"1 2 2 I-I 'S 5 0 2 '::.' 0 6 5 L-: P 0 2 4 E, 8 0 H M i'i 0 2 4 E, A 0 H i'i hi 0 2 4. 6 :--', DEGF 0 2 4 68 0 2 i2 65 0 H i'l i',I n 2 4 6 D E G F 0 <.-" 4 :5 ;--: I'1 "" .-- i 2 65 P .-2 ~.~4 E: r'OMMENT RF :Cn · ~$ 't'hi~. LIS tape ,Ja~ ~,~.-itte..n bp Gmar. har, t. Ir~du~.t.~.-ie.~.-"~ ~.dir-~line S~sF. vicms, :,~.:+: All cur. ye: and tool mn,'-',.rf~onic~", usmd ar'~z tho:-:,=' ,.,~h:Lch most. cio~mll.,, mat. ch :ss C~,~ar.h..~r-t. curve and tool rr~r'~emonics, :+.':'~: :f'. $' :~. :~. :+: :~ :4'. :.J< :+: a'. :¢. ,'~. :~: :-I'. :~: ~: '¢ d: :+: :.~: :~ :T: :~.: :.k :'~ :,[', :.t-: ~.-[: .'~. :'B :i~ :i.: :.k 8: :~. :i': :.~: :~: ~. d~ d': :.[.: :'1', ;~ :~,~ ~'[': :'k W. :~: :'1': :.k :~c ;.k '.~: :+: :+: -'~ :~: :~. :'1: ;i.: :~- :+: :'k d': :~¢ d~ -"t': :.t.: .~t :~: :'P. :.I': :.i.: :~ :'~ :~: :a :.k :~: :~: ~: :'k :~. :~. ~ :+: :+'. :,[: :~ :f: :~: ~. ~'. :¢ :¢ :~: :+: d'. d.'. :.~ :-~ :.t: :¢ :+: :f: :.B :~: :~: :~..~, :-~: :.[: :.[: :¢. :~: :~: :.[.'. :+: :~: :.i'. :~, :~ :~' t.~. :+: '.[: :~,: :.k :~. :~: :~: :~. :~. :i': W. :~. :+: :.B :~. :~: :+: :~: :.f: N: :-P :.I': :+: :~: :~. :.P. :.P. :~. GEARHART TO SCHLUHBERC.,ER I'i N E H S E R V I C E U i',f I T i'i N E DEPTH FEET DEF'T T E N H E R G E H V T E N S E;P MERGE AF'I SP ~2F,' I',iER GE G~P '[ ,..,CR L I'IERGE l NC:H CALI I L [:, H E R G E O H I"1H I L C' I LM HERGE OHMH ILH L L 3 H E R ~] E F~ H M H L L :$ F F D F: l"i E R G E C: P :_:; F F [:' C: N FE:' C: H E F.: G E C F' ::; !".t FE:, F: R H O B t;i E F.: G E G ,.-" C: S R H n B E:, R H O H E F.: G E ~.S ,.:' C.' 3 E.', R H O' F C: f,t L H E R G E C: F'S F C i'4 L 1'4 C: i',i L i'i E R G E C: PS f.,i C i'-I L C: ..T. L E.', C: O H F' IJ T E E:, M 1"'1H O C: I L E'.:, C: E.', L F: O t"l F' U T E E:, F' i_l D P H I I'--I r H ._-, F: O I"i F' ij T E .E:.., S S F' U l'--I F' H T D T I"i E F.: G E U S ;"' F E.', I' SERVICE UNIT FT i'IERGE M',.,' HERGE AP I biERGE GAF'I MER GE I N !"1E R G E 0 HH H MERGE OHi"iH M E R G E 0 H H H I"i E F,' Q E L-: P S HERGE CPS ~' - 'Fi' l ..... -'-' MI--F,-.,E .,,-- L..", hiERGE G,.-'C3 HERGE CF'S I'1 ER G E ,-,J F'S C: F~ H P U T I'I I'l H O F: F~ H F' U T F' U F: O H F' U T F' U H E R G E LIS ,.." F RRT COI~iPi. J 1'ED R~StT COMF'UT · ...... ENTRY T Y P E S t .'-~: E C 0 D E 0 ~ 6 6 0 Te:r, minatoi ..... :: no mor.~', ent?'ie,.~: ) D A T A F O R M A T S P E C I F; I C: A T 1 ri iq c, SEPYI-., CE SERVICE M N E M i D 0 R P E R APi APl AF't APi FiLE UH];T L. OG TYF:'E C:LAS:-: MOD ¢ DEPT 3 0,4.874 TENS M E:Rf:;E E: 0487'4 S P M E F.: O E.7._ 0 48 -',, 4. O R M E R G E :3 O 4. 874 C: A L. i H E R O E :304 @ 74 I L i::, M E R (;i E3 0487,4. i L f,i i"i E R G E3 04874 L L 7: M E R G E 3 04 ::374 FFDr: MERGE 3 04.°~,~ ,' 4" N F D C M E R G E 3 () 4874 R H 0 E', M E R G E 3 04874 D R H 0 M E R G E .3 O 4. 874 FCNL MERGE :30487'4. N C N i_ M E R 6: E 3 04 ;.974. CILD COMPUT ~04874 DPHi COMPUT S04874 Ni::'H Z COMPUT 384874 DT i'ilERGE ~ 04874 R.qT COMPUT ~ P R C ~ SiZE L. Vi_ SMPL F.:C PROIE:ESS i Nj:, i CATOi;;:S 000000 000000 0000()0 OOO00O 000000 O00()O0 000000 000000 000000 000000 O000OO 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 0()0000 000000 000000 000000 000000 000000 000000 000000 0000()0 RECORDS [:,EP T 'FENS SF' Gl;.: C ¢:'~ L ..T.T I L.F.;, ;f. L, i"i LL ;3 F F i.'.~ C: N F:' b C: R H 0 B [.':, R H 0 F C: f.-I L l'-.i C t',t L C.: ]: L [:', D F' i--i N P H Z [::, T R ~::~ ]" t '"' '":' 0 ~:'':' '":' '":' q ":''' '"' 0 ¢; .z, OOO ,::.,.-..... .., 000 0 Or,'O ,., ,.. 0 or.'o i 0¢~0 I OOf"r~"'~.. ,... , ¢20 i , ~'~"~ r:... 0., 000 O, 000 0., 000 O, OOn ~:~, 0~:~0 0,000 i 000,000 i E,O ,,5,0 i O, 2 i4. O, 000 .-999,250 1 0005,0 O 0 ;~ 7'94., 000 '23,00.0 '20,900 9., 090 8,356 S, t 66 t 6, ;.:i: ;:.27 505,200 502,200 2,22'.'9. 0,000 i38,;300 3iS,O00 ii9,674 25,515 ~0,2S0 q'"", . .. ,. rS ~"~ 0 ',7-:..:', 22 i . ,. '~ "'"' 2 °9, I 00 o, p'~ 600 8 ,. 84 0 :~, :~ 51 ';," --, :: ~-9 ........... :,. ~.., i ~ 0, i 9905 000 .',o1~ 000 _.. .. .".:..l '~ O 00 5 ,.~ 8 900 "-' 25 ~S 04.3 'i 46,9 O 0 "~: i i i 00 ! 'i '"'" 980 ':.'"'.~ ~'~ 7 q.. .... ,r4 u.,.....,, 0'" ~ 0 O 3,'-' 25 ,000. 2 ',...:3,500 i 8,800 8,8 '20 30.339 ;.24,60,4. :3 ~S, 2 ;:24 4. C.49, ..':., O 0 4. 99 ,. 600 2', .'-Z ," 4 ,002 'i 7' 2_, 9. 00 .:,~ 44. , ,'" 0 ri ._"; z, 96 'i ;::: z , ,. c..,. ,:, 26 oi0 9i OOO i '"'"'"-' , ,.. , , ,~ ,.-', 97' 05 00 O 370 i 000 40 900 '24 't .00 a,' b: 6 ri ~:::,., 096 4 :.-'..: ..: --, ~ ,=,._,, i 76 447', 6 0 O 4. 77,500 2., 29 '1 -, 0 i S 265,900 43 i , 900 i 5, :--: 49 '2 -i , 7.=; :-q I 7,4 F-i!5 S ~., 9 O 0 i, -'~ '6 i 9 ~S O 5, 00 O S 67' 2, 000 3 S, 90 n 21 , ;S: 00 F:., 94 n I O,S ,. 905 :--, u, ::, :::: 2 99,770 ~::,04.,900 529,800 2,i4.:'--¢ ,004 227,000 3;--:2,400 9,S54 :30,424 20,530 iOi ,400 i ,6i4 9505, 000 3;E. 08, O00 4S,600 ~4,E, O0 9, iSO 47,4'.2,4 S5.5~SS 56, i 05 552,00 O 5 i 9,3 00 2, i 6 i , 002 ';.' i 7,500 ,..'.-': 7'6,200 2 i , 0 C-; 6., 29. :S .S E, '":-'0 q~O q:-: i O0 i 644 'Ss 405,000 3652,0 ri 0 i 00,600 12 ._-4,50 0 I i ,,~'" .... = 0 i 4 '~ 6 o,=.. 5, irt 5 '= .... ..... z ,' -'.--'. 299,9 00 -"3 i S, 7 i"~ 0 2,665 , i 8 S 59, ',--" 0 ~-~ i 94,80 i'~ ~, :::,, S 3"¢, .... , S.' 09 ° ':":' '-':" '--':"'-'"" F ,.¢- i,: ....... ¢~ .,,% D E P T F' F' D C NPH t T E N S N F P C: D T SP R H 0 B R A T GR D R H 0 R E C: O R D C: A L i F: C N i._ iL, D N C N t_ iL.M CiL. D LL3 [:, F:'H i F' .a g ~ 9 S 05, O 0 O i 35,8 00 62,3:'.~0 · S6 08. 000 i i :q, i 00 7'3, i O0 72, O 0 0 9, 0 ;-20 · ,..,. 0 0 I 00000, 020 i P;"" f~4~ File: n,.!r;:e: &GSF'O] , 00'i T R A l L E R R E C 0 R D S Fi 1~ t,.:.,pe: [.0 N~xt. f'ile: F' .a g E: i:* EOF' :+:**