PLUGGIN & LOCATION CLEA kNCE REPORT
State of Alaska
.ALASKA 0IL & GAS CONSERVATION COM~ISSION
·
· .
,.Memcrandum To File:
casing _size
c~g: /~
Long Csq: ?~
· wt, depth, cmt vol, & urocedur~.
LFo A~o~~ . ~.7~5
LEo ~1 lO/ ~I I0
Review the well file, and' comment on plugging, well head
status, and location clearance
~.,//o7o-- /0 7~s /
- provide loc.
l "e"
clear, co .~,/
om/
Code
Signed
Date
~_,, STATE OF ALASKA ._
ALASK/ IL AND GAS CONSERVATION ( ,'VIMISSION
_L COMPLETION OR RECOMP LETION REPORT AND LOG
.~ of Well Classification of Service Well
IL F- GAS [] SUSPENDED [] ABANDONED [] SERVICE [] P!u.qqed back for CT siderack
7. Permit Number
86-18
.. Name of Ope'ra~tor
BP Exploration
3. Address
P. O. Box 196612, Anchoraqe Alaska 99519-6612
4. Location of well at su dace
1716' SNL, 1692' WEL, Sec. 23, T11N, R13E
At Top Producing Interval
120' NSL, 365' WEL, Sec. 15, T11N, R13E
At Total Depth
455 NSL, 746' WEL, Sec. 15, T11N, R13E
5. Elevation in feet (ind icate KB, DF, etc.)
KBE= 72.20
!8. APl Number
50- 029-21530
9. Unit or Lease Name
Prudhoe Bay_ Unit
0. Well Number
D -26
1. Field and Pool
6. Lease Designation and
028284
Serial No.
Prudhoe Bay Field/Prudhoe Bay Pool
12. Date Spudded
1/21/86
17. Total Depth (MD+TVD)
11070, 9170
22. Type Electric or Othe
13. Date T.D. Reached 14. Date Comp., Susp. or Aband.
12/86 I 5/26/97 20.
18. Plug Back Depth (MD+T VD) 19. Directional Survey
10725, 8825 YES [] NO []
r Logs Run-
15. Water Depth,n/aif offShfeet MSL°reI~i16' No. of Completions
Depth where SSSV set i21. Thickness of Per-m~-f-r~ ..... .~
2006 feet MD ! _app_r~o_x_l__9OQ'
23. CASING, LINER AND CEMENTING RECORD
SETTING 'DEPTH ME:
CASING SIZE WT. PER FT. GRADE TOP t BOTTOM HOLE SIZE CEMENTING RECO
30x30 I Insulated conductor surface 140 36" 8 c. V ....
13-3/8" 72# L-80 surface 2709 17-1/2 3725 c.f.
9-5/8" 47# L-80 Surface 2110 12-1/4 2110 c.f.
7" 26# L-80 9867 11070 8-1/2 435 c.f.__ .
I
24. Perforations open to Production (MD+TVD of Top
interval, size and number )
none
AMOUNT PULLED
and Bottom and 25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" L-80 9805' 9805' w~ 4-1/2" tai!piPe to .1_0756
26. ACID, FRACTURE, CEMENT SOJEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11070- 10725 2 bbls G 18 bbls fiber cmt
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flow ing, gas lift, etc.)
not on production
Date of Test ';Hours Tested PRODU'CTION FOR OIL-BBL iGAS-MCF WATER-BBL ~CHOKEi
TEST PERIOD I~ ' i
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GR
Press. 24-HOUR RATE I~
SIZE iGAS-OIL RATIO
GRAVITY-APl (corr)
28. CORE DATA
Brief description of iith ology, porosity, fracture s, apparent dips, and pre sence of oil, gas or wate r. Submit core chips.
Form 10-407 submit in d~l~ii(~at~
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
NAME
GEOLOGIC MARKERS
MEAS. DEPTF
10845
10873
TRUE VERT. DEPTb
8855
887O
30.
~- DRMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each pha se.
31. LIST OF ATTACHMENTS
32. t hereby certify that the foregoing is true and co
Signed
rrect to the best of my k nowledge
Title Cnil Tuhin.q Drillin.q TA
Date
General: This form is des
all types of lands and le
Item 1: Classification of
water disposal, water sup
· Item 5: Indicate which el
given in other spaces on
Item 16 and 24: If this
completion), so state in
in item 27. Submit a sep
data pertinent to such in
Item 21: Indicate whether
Item 23: Attached supplem
ing and the location of t
Item 27: Method of Operat
jection, Gas Injection, S
Item 28: If no cores take
igned for submitting a co
ases in Alaska.
Service Wells: Gas injec
ply for injection, observ
evation is used as refere
this form and in any atta
well is completed for sep
item 16, and in item 24 s
arate form for each addit
terval.
from ground level (GL) o
ental records for this we
he cementing tool.
ion: Flowing, Gas Lift, R
hut-in, Other-explain.
n, indicate "none".
INSTRUCTIONS
mplete and correct well c
tion, water injection, st
ation, injection for in-s
nce (where not otherwise
chments.
arate production from mor
how the producing interva
ional interval to be sepa
r other elevation (DF, KB
II should show the detail
od Pump, Hydraulic Pump,
ompletion report and log on
eam injection, air inject ion, salt
itu combustion.
shown) for depth measurem ents
e than one interval (mult iple
Is for only the interval reported
rately produced, showing the
, etc.).
s of any multiple stage c
ement-
Submersible, Water In-
Form 10-407
D-26A
Cement Plug
Daily Operations
5/26/97
Bullheaded kill the well with 365 bbls FSW. Well is a drinker. RIH and cool sump with 86 bbls.
FSW. Laid in 2 bbl "G", 18 bbls fiber cement and 1 bbl "G". POOH to safety of 9600. Pumped a
total of 31 bbls down b/s and tubing before fluid at surface. Based on a static of 3375 psi this
would equate to a fluid level of,--1300 or 16 bbls in ct/tubing annulus indicating well drank cement
to 10840'. Jetted 50 bbl. biozan to 10735 CTD and POOH. Saw cement tins in tank with 180
bbls of jetting SW. There were indications from pump pressure that some of the fiber cement
was left in coil.
CEMENT
Class G with at 17 ppg with 4.5 ppb fibers
5/27/97
RIH w/K J, 3.50 Cent. & Tel. Sat down @ 10725' WLM. RIH w/K J, 2.25 Cent. & 1.75 bailer to
10731' WLM. Sample cement.. RDMO.
D-26A
Cement Plug
Daily Operations
5/26/97
Bullheaded kill the well with 365 bbls FSW. Well is a drinker. RIH and cool sump with 86 bbls.
FSW. Laid in 2 bbl "G", 18 bbls fiber cement and 1 bbl "G". POOH to safety of 9600. Pumped a
total of 31 bbls down b/s and tubing before fluid at surface. Based on a static of 3375 psi this
would equate to a fluid level of-~1300 or 16 bbls in ct/tubing annulus indicating well drank cement
to 10840'. Jetted 50 bbl. biozan to 10735 CTD and POOH. Saw cement rtns in tank with 180
bbls of jetting SW. There were indications from pump pressure that some of the fiber cement
was left in coil.
CEMENT
Class G with at 17 ppg with 4.5 ppb fibers
STATE OF ALASKA
ALA"'"'~ OIL AND GAS CONSERVATION COMMIS"~"~N
APPLICA', ,ON FOR SUNDRY AF,-ROVALS
of Request: Abandon x Suspend __ Operation Shutdown __ Re-enter suspended well __
Alter casing __ Repair well __ Plugging X Time extension .__ Stimulate __
Change approved program __ Pull tubing __ Variance __ Perforate __ Other__
_. Name of Operator
BP Ex/aloration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchora_qe, Alaska 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effective depth
434' NSL, 725' WEL, SEC. 15, T11N, R13E, UPM
At total depth
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
5. Type of Well:
Development x
Exploratory __
Stratigraphic __
Service
6. Datum elevation (DF or KB)
KBE= 72.70 AMSL
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26
9. Permit number
86-18
10. APl number
50- 029-21530
11. Field/Pool
Prudhoe Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2679
Intermediate 10106
Production --
Liner 1203
Perforation depth:
11070 feet Plugs (measured)
BKB 9170 feet
11026 feet Junk (measured)
BKB 9137 feet
ORIGINAL
Size Cemented Measured depth True vertical depth
BKB
20 x 30 8 c.y. 140 140
13 3/8 3725 c.f. 2709 2608
9 5/8 2110 c.f. 10136 8477
7 435 c.f.
measured 10730'-10750', 10794'-10824', 10842'-10867'
true vertical subsea
9867-11070
1997
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth) 9 5/8" Baker FHL packer at 9805'; 7" Baker SAD packer at 10756';
4 1/2" SSSV at 2036'
13. Attachments
Description summary of proposal X Detailed operations program __
BOP sketch
14. Estimated date for commencing operation
5/20/97
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas
Suspended__
Service
17. I hereby certify J, hat the foregoing is true and correct to the best of my knowledge.
Signed O~~~ TitleCoilTubinclDrillinclEnclineer
' //' FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance__
Mechanical Integrity Test__ Subsequent form required 10- ~ e 7
0ngmal $~gnea uy
Approved by order of the Commission David W. Johnston
Form 10-403 Rev 06/15/88
Commissioner
Date ~//,¢ ?
I Approval N o~,,~
Date
SUBMIT IN TRIPLICATE
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: May 1, 1997
To:
Attention:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Blair Wondzell
Sr. Reservoir Engineer
ORIGINAL
Re:
Well D-26 Prep for CT Sidetrack
Well D-26 is scheduled for a through tubing sidetrack to be drilled with
coiled tubing. The following summarizes the procedure required to
prepare D-26 for sidetracking and is submitted as an attachment to
Form 10-403.
1. Perform tubing integrity test.
2. Drift tubing and liner with a 3.7" OD, 20 ft long drift.
3. Run Kinley caliper over the proposed whipstock interval to confirm
liner condition.
4. RU service coil and abandon existing perforations with approx. 20
bbls. of fiber cement in preparation for cement whipstock..
Squeeze to 2000 psi. Pressure test with AOGCC witness.
5. RU slick line and tag cement with AOGCC witness.
6. Mill window in liner with drilling coil.
Ted Stagg '
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
STATE OF ALASKA
Ab. ..... A OIL AND GAS CONSERVATION COMMIS~, .... ,,i
REPORT OF SUNDRY WELL OPERATIONS
,. Operations performed: Operation shutdown Stimulate X Plugging__
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, SEC. 23, T11 N, R 13E, UPM
At top of productive interval
120'NSL, 365'WEL, SEC. 15, T11N, R13E, UPM
At effective depth
434'NSL, 725'WEL, SEC. 15, T11N, R13E, UPM
At total depth
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
RECEIVED
APR 1 9 i994
Oil & Gas Cons. Commission
6. Datum elevation (DF or KB)
KBE = 72. 70 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26 (44-15-11-13) PBU
9. Permit number/approval number
86-18 /
10. APl number
50- 029-21530
11. Field/Pool
Prudhoe Oil Pool
455' NSL, 746' WEL, SEC. 15, T11 N, R 13E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11070 feet
BKB 9170 feet
11026 feet
BKB 9137 feet
Anch0raae
Plugs (measured)
Junk (measured)
ORib'ii'V'AL
Casing Length
Structural --
Conductor 110
Surface 2679
Intermediate 10106
Production --
Liner 1203
Perforation depth: measured
Size Cemented Measured depth
20 x 30 8 c. y. 140
13 3/8 3725 c.f. 2709
9 5/8 2110 c.f. 10136
7 435 c.f.
10730'-10750', 10794'-10824', 10842'-10867'
9867-11070
True vertical depth
BKB
140
26O8
8477
8281-9170
true vertical subsea
8846'- 8948' (three intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth) 9 5/8" Baker FHL packer at 9805'; 7" Baker SAB packer at 10756';
4 1/2" SSSV at 2036'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
2321 ~ 19740 441 0
2 722 23640 518 0
Tubing Pressure
1638
1662
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoin~g is true and correct to the best of my knowledge.
Signed ~--~..~:b,-~'~l,:,. (//%! :~.,~ Title Senior TechnicaiAssistant,
Form 10-404'Rev 06/15/88 '~-
Date
SUBMIT IN DUI~LIC'ATE
7/11/93
WELL D-26(44-15-11-13)
Stimulation Operation
A HCL STIMULATION W/IBP Treatment was performed using the
following fluids:
JOB SUMMARY
RIH AND SET 3 3/8" INFLATABLE PKR. COULDN'T PUMP
THROUGH. POOH AND FOUND SMALL AMOUNT OFCL IN TOOL
THAT WAS HOLDING BALL OFF SEAT. LOST RUBBER. JOB
ABORTED. S/L TO FISH RUBBER.
FLUID SUMMARY
270 BBL. SW
8/23/93
The following interval were reperforated using 3 3/8"
guns, 4 SPF, 45° orientation and 120° phasing.
10828'- 10835' MD
fjh
12/21/93
RECEIVED
. I:~
& Gas Gores. Comrnissiop,
Anchorage
BP EXPLORATION
· .
r.
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 09/03/93
T# 84966
BPX/PBU ~'~LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
D-26 ~ PFC / 08/23/93 #1
G-10 ~[-~ PRODUCTION LOGw 08/24/93 #1
H-18 ~-Z%DCNL~ 08/24/93 #1
R-04 '7~-~e6 CNL ~{~ 08/24/93 #1
U-04A~-L~E~)~[~~ 08/23/93 ~1
Y-04 7q- {05 LPERF)~6~ ~ 08/26/93 ~1
Y-12 (PERF3 ~ 08/26/93 ~1
10650.00-10953.00 ATLAS 5 "
9650.00-10018.00 ATLAS 5 "
8950.00- 9613.00 ATLAS 5
9100.00- 9803.00 ATLAS 5 "
10654.00-11112.00 ATLAS 5 "
9900.00-10200.00 ATLAS 5 "
9033.00- 9180.00' ATLAS 5 "
Information Control
Well Records
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
//
DATE: 01-15-93
T~ 84251
BP CH LOGS
Enclosed is your copy of the materials listed
questions, please contact BP Well Records at
A-17 ~o ' I%~
INJ
lA-24~Z,~O CNn
A-24 GR
D-04A~'f~PRODUCTION LOG
D-05 ~e-~ PRODUCTION LOG
D-26 ~-I~. PRODUCTION LOG
F-02 ?..fM PRODUCTION LOG
F-10 ~'~ PRODUCTION LOG
F-13 ~. PRODUCTION LOG
M-19A?~ I;7 CL
x-04 ??-8? PRODUCTION ~OS
x-275¢-~? PRODUCTION LOG
01/06/93 91
01/03/93 #1
01/05/93 ~1
01/07/93 #1
01/07/93 ~1
01/05/93 ~1
01/07/93 ~1
01/09/93 #1
01/08/93 ~1
01/07/93 #1
01/09/93 #1
01/09/93 91
01/08/93 #1
Information Control
Well Records
below. If you have any
(907) 564-4004.
9700.00-10750.00 ATLAS 5 "
10600.00-11355.00 ATLAS 5 "
10800.00-11350.00 ATLAS 5 "
10200.00-10700.00 ATLAS 5 "
10400.00-10729.00 ATLAS 5 "
9700.00-10925.00 ATLAS 5 "
10100.00-10600.00 ATLAS 5 "
9650.00- 9970.00 ATLAS 5 "
8960.00- 9198.00 ATLAS 5 "
8950.00- 9120.00 ATLAS 5 "
9250.00- 9850.00 ATLAS 5 "
9990.00-10230.00 ATLAS 5 "
11300.00-11600.00 ATLAS 5 "
' CEIVED
JAN 2 ~ 3993
Alaska Oil & Gas Cons. Commissiorl'
Anchorage
STATE OF ALASKA
A,_. ,,5KA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Operations performed: Operation shutdown Stimulate x Plugging__
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effeCtive depth
434' NSL, 725' WEL' SEC. 15, T11N, R13E, UPM
At total depth
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Effective depth: measured
true vertical BKB
11070feet
9170feet
11026feet
9137feet
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
Plugs (measured)
Junk (measured)
6. Datum elevation (DF or KB)
KBE-- 72.70 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26 (44-15-11-13) PBU
9. Permit number/approval number
86-18 /
10. APl number
5O- 029-21530
11. Field/Pool
Prudhoe Oil Pool
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented
..
110 20x30 8 c.y.
2679 13 3/8 3725 c.f.
10106 9 5/8 2110 c.f.
Measured depth True vertical depth
BKB
140 140
2709 2608
10136 8477
measured
..
1203 7 435 c.f.
10730'-10750', 10794'-10824', 10842'-10867'
true vertical subsea
8846' - 8948' (three intervals)
9867-11070 8281-9170
DEC
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749' , .........
Paokem and SSSV (type and measured depth) 9 5/8" B~er FHL packer at 9805'; 7" B~er SAB packer 4 1/2" SSSVat 2086'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
See Attachment
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 4450 15597 445 0 838
Subsequent to operation 5470 18582 545
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas Suspended
17. I her~.c,e~he foregoing issue and correct to the best of my knowledge.
Signed ,~'~~' ~ ~'"'.~'~' ~ ~'~)"~ Title Supervisor Gravity Drainage
0 707
Service
Date J~-'J~
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
WELL D-26 (44-15-11-13) PBU
STIMULATION OPERATIONS
A CTU selective HCI treatment was performed October 7, 1990 on Well D-26.
Pressure tested to 4000 psi to start acid job. Pumped 13 BBLS of diesel with mutual
solvent. Pumped 25 BBLS of 15% HCL and 8 BBLS NH4CL with Divert 1. The well
was returned to production immediately following the treatment; then tested.
mr/12/! 0/9 0
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
Re. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
June 26, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attention' Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen'
Enclosed, in duplicate, is form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of pulling tubing and repairing the well.
Yours very truly,
Workover/Completions Supervisor
RVS/KTH
Enclosures (4)
CC"
J. Martin (MB9-4)
North Slope Production Engineers
Mark Grindle (MB 5-3)
Well File
RECE;VED
Alaska Oil & 8as Cons. Commission
Anchorage
STATE OF ALASKA
AL,-,,.,KA OIL AND GAS CONSERVATION COMMIS,.,.,~N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown__ Stimulate__ Plugging__
Pull tubing X Alter casing Repair well X
Perforate.__
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effective depth
434' NSL, 725' WEL, SEC. 15, T11N, R13E, UPM
At total depth
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
72. 70 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26 (44-15-11-13) PBU
9. Permit number/approval number
86-18/9-062/9-165
10. APl number
50- 029-21530
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11070 feet Plugs (measured)
9170 feet BKB
11026 feet Junk (measured)
9137 feet BKB
Casing Length Size Cemented Measured depth True vertical depth
Structural ............ BKB
Conductor 110' 20" x 30" 8 cu. yds. 140' 140'
Surface 2679' 13-3/8" 3725 cu. ft. 2709' 2608'
Intermediate 10106' 9-5/8 2110 cu. ft. 10136' 84 77'
Production ...............
Liner 1203' 7" 435 cu. ft. 9867'- 11070' 8281 '-9170'
Perforation depth: measured 10730'-10750'; 10794'-10824'
true vertical 8846'-8861'; 8894'-8916'
Tubing (size, grade, and measured depth) 4-1/2" L-80 to 9809' with 4-1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth) 9-5/8" TIW packer at 9809'; 7" Baker SAB packer at 10741'; 4-1/2" SSSV at
2006'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
KI:L I:: V 1:: U
;JUN 2 5 1989
.Alaska 0il & 6as Cons. Commission
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure
5230 9702 107 0
6921 13555 141 0
Anchorage
Tubing Pressure
491 psig
377 psig
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ ~ Title Completion En¢ineerin~7 Supervisor
Form 10-404 Rev 06/15/88''~
/
Date ~,/;~--~~
SUBMIT IN DUPLICATE
WELL D-26 WORKOVER
ATTACHMENT I
Procedure Outline:
1. MIRU workover rig. Accepted rig at 1500 hrs on 3-31-89.
2. Pulled BPV. Circulated diesel from well. Installed two-way
check valve.
3. ND tree. NU & tested BOP's to 5000 psi.
4. Pulled 4-1/2" tubing. Changed rams to 3-1/2". Tested BOP's.
5. RIH w/overshot release and recovered the 9-5/'8" Baker
retrievable packer with 4-1/2" tubing.
6. RIH with 6" overshot. Recovered cutoff and 'K' anchor from 7"
packer. RIH 9-5/8" casing scraper. Reverse circulated.
7. Made 7" scraper run to top of fish. Replaced 9-5/8" packoff &
tested to 5000 psi.
8. RIH with 7" RTTS and dummy latch. RIH and tested 9-5/8"
casing and 7" liner lap to 2500 psi. Stabbed dummy into latch
and circulated. POH.
9. Made 8.5" gauge ring/junk basket run.
10. Ran 4-1/2" straddle completion with GLM's.
1 1. Latched into 7" packer.
12. RU wireline and set plug in the tailpipe.
13. Set 9-5/8" packer.
14. Sheared SBR. Determined space out and displaced annulus to
inhibited brine and landed tubing.
15. Tested SBR. Set 2-way check. ND BOP's. NU & tested tree to
5000 psi.
16. Pressured up annulus to test packer and sheared valve in top
GLM.
17. Pumped 135 bbls diesel down the annulus and "U" tubed diesel
to tubing.
18. Set BPV.
19. Pumped down cellar. Released rig @ 1900 hfs on 4/7/89.
RECEIVED
gUN 2 6 198g
~laska Oil a Gas Cons. Commission
Anchorage
BP EXFt. ORATION
Daily Drilling Report-- PBU -- Workover
April 3, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491
(Expense)
AFE Amount:
Current Amount:
0600 Depth: 11026'
Day: 3
Current Operation:
Testing BOP.
Accepted rig at 1500 hrs. 3-31-89. Kill well. Recover 260 bbl crude oil. ND tree. NU
and test BOP. Unable to shear PBR. Ran 3.625 swedge to 9900. Cut 4--i/2" robing at 9697
with jet cutter. Pull and lay down robing. Change rams to 3-1/2". Test BOP.
RE CE VED
Alaska Oil & Gas CrJns. Commission
Ancl~orage
Daily Drilling Report -- PBU -- Workover
April 4, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491 AFE Amount:
(Expense) Current Amount:
0600 Depth: 11026'
Day: 4
Current Operation:
Test BOP to 5000 psi - OK. RIH with overshot release and recover 9-5/8'_' retrievable
packer and straddle robing. RIH with 6" overshot.
8P ~(PLOR~N
Daily Drilling Report -- PBU -- Workover
April 5, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491 AFE Amount:
(Expense) Current Amount:
0600 Depth: 11026'
Day: 5
Ctarent Operation: RIH 7" scraper.
Recover cutoff and K anchor. RIH 9-5/8" casing scraper. Reverse circul_ate RIH 7" casing
scraper.
BP EXPLOR~N
Daily Drilling Report -- PBU -- Workover
April 6, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491 AFE Amount:
(Expense) Current Amount:
0600 Depth: 11026'
Day: 6
Current Operation:
Making 8.5" gauge ring run.
Ran 7" .:..: i~" scraper. Replace 9-5/8" packoff and test to 5000 psi. RII-Lwi~ RTTS and
dummy' latch. Test casing and lap to 2500 psi - OK. Stab dummy into latch and circulate.
POH. Made 8.5" gauge ring run.
BP ~R. OR~N
Daily Drilling RePort-- PBU -- Workover
April 7, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491
(Expense)
AFE Amount:
Current Amount:
'0600 Depth: 11026'
Day: 7
Current Operation:
Spacing out robing.
RIH 8.5" gauge ring to liner top. Ran 4-1/2" robing. Latch into 7" SAB-packer. Set plug
in tail pipe. Set packer. Shear SBR. Spacing out robing.
BI~ EXPt. OR~N
Daily Drilling Report -- PBU -- Workover
April 10, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: D-26 (44-15-11-13)
AFE # 160491 AFE Amount:
(Expense) Current Amount:
0600 Depth: 11026'
Day: 8
Current Operation:
Released rig.
Land tubing. Test SBR. Set 2 way check. ND BOP. NU and test tree to 5000 psi. Shear
GLM valve and displace 135 bbl diesel and "U" tube to tubing. Install BPV. Release rig
1900 hfs 4/7/89.
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON ........ · - Oa*e:
TE,v~CO
'TO: TS:
MOBIL
~TATE OF ALASKA '
ARCEIVES
INDEXED
BP Exploration (Alaska) Inc, --'-----
900 East 8enson 8ouievarM
PO. Box 196612
Anchorage. Alaska 99519-6612
04-26-89
80011
REFERENCE:
BP F~I~L DATA - PRESSURE SURV~f DATA
The following material is being submiJ-fed herewifh. Please acknowledge receipt by
signing a copy of this .le~rer and returning It fo this office:
B-23 S~atic Gradient 04-20-89 Camco
D-17 Static Gradient 04-18-89 Camco
D-26 Static Gradient 04-22.-89 Camco
E-03 Static Gradient 04-16-89 Camco
F-11 Static Gradient 04-20-89 Camco
H-24 Flowing Gradient 04-19-89 C~nco
K-05 Static Gradient 04-18-89 Camco
'M-17 Static, Gradient 04-20-89 Camco
S-18 : Static Gradient 04-16-89 Camco
X-19 Static Gradient 04-20-89 Camco
Z-25 Static Gradient 04-16-89 Camco
Z-31 Static Gradient 04-21-89 Camco
Received
Alaska 0il & Gss Ccn~. Commission
Anchorage
Shirley R. McCurry
I NFORMAT I ON CONTROL
Well Records LR2-1
BP EXPLORATION
TO:
HOUSTON '-
ARCO
CHEVRON
E,~L%ON
TEXAuO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
BP ExDIoratlon (Alaska) Inc.
900 East Benson Boulevard
P.O, Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Da*e: 04-07-89
T~: 79941
RESERVOIR
REFERENCE: ~R~7~S ~
Bp'cASED ~OT.E F:~AT., LOGS
The following material Is being submi,'Yt'ed herewith. Please acknowledge receipt by
slgnlng a copy of this letter and returning It to this office:
C-21 Completion 03-31-89 #I 7950-9201 Sch 5"
D-26 Completion 03-02-89 #1 9690-9930 Sch 5"
K-lO Completion 04-01-89 #1 9440-10070 Sch 5"
U-3i Completion 04-02-89 #1 8910-9492 Scb 5"
U-lOi Copmletion 04-02-89 #1 9450-10104 Sch 5"
Y-3i Completion 04-04-89 ~.1 0-9280 Sch 5"
Y-09 Completion 04-05-89 #1 10120-10450 Sch 5"
Y-11i Completion 04-05-89 #1 9546-9850 Sch 5"
Z-01 CNL (2 1/2") 03-31-89 #1 10100-10784 Sch 5"
Y-05i Completion 04-04-89 #i 9680-9900 ,Sch 5"
Rece i ved
Date
g]3C~Or~O Shirley R . Mc
I NFOR~Ti ON CONSOL
..
Wel I Records LR2-1
BP EXPLORATION
TO:
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE: ARCHIVES
BP'CASED HOLE FINAL LOGS
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DaTe: 03-30-89
T~: 79913
The following material Is being submiTTed herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
D-26 CL._ 03-22-89 #1 9693-9935 Atlas 5"
D-26 Tubing
cutter 03-22-89 #1 10568-10749 Atlas 5"
Rece i ved
Date
Shirley R. MlcCurry
I NFORMAT I ON CONTROL
Wel I Records LR2-1
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON
BP Exploration (AlaSka) In~
900 East Benson Boulevard
P.O. Box 196612
Anct~omge. Alaska 99519-6612
(907) 561-5111
TEXACO Date: 03 - 30 - 89
MOBIL T~: 79915
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE: .Ai{C"~tI'9-ES
·
BP'CASED HOLE FINAL LOGS
The following materiel is being submi~ed herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~A-29 PROD-R 02-21-89 #1_ 10600-11067 , Camco
~C-21 Leak Der 03-09/1 0-89#1 7800-9215 Camco
$D-08 Completion 03-07-89 #1 8800-10472 Camco
eD-26 PROD-R 03-11 -89 #1 10500-10920 Camco
'~ E-11 PROD-R 03-12-89 #1 10400-10572 Camco
E-17 PITS 03-08-89 #1 10800-11093 Camco
-05 PITS 03-1 0-89 #1 10000-10250 Camco
eM-03 INJ 03-1 4-89 #1 10600-1 1100 Camco
M-14 INJ 03-1 4-89 #1 101 00-1 0770 Camco
N-04 PITS 03-09-89 #1 10100-10400 Camco
R-08 GAS LIFT 03-10-89 #1 2500-10500 Camco
eU-9I INJ 03-15-89 #1 10700-11320 Camco
eW-04 CCL 03-11-89 #1 11310-12210 ,Camco
.~e W-lO CCL 03-11-89 #1 13640-14604 Camco
mY-01 GAS LIFT PROD 3-13-89 #1 12250-12794 Camco
5"
5"
5"
5"
5"
5"
5"
5"
5"
2"/5"
5"
51! .
5"
5"
Rece i ved
Date
"~ Cone. Con; .o~,:.
Shirley R. McCurry
I NFOPJ~AT I ON CONTROL
Wel I Records LR2-1
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
March 21, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
J. T. Brown
Supervisor Gravity Drainage
JTB:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
RECE ,VED
MAR 2
..,Oil & Gas Cons, Co~lor~
'~ ~nchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
Stimulate. Plugging .
Alter casing Repair well
5. Type of Well:
Development. X
Exploratory,
Stratigraphic,
Service
4. Location of well at surface
1716'SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effective depth
434' NSL, 725' WEL, SEC. 15, T11N, R13E, UPM
At total depth
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
Perforate X
Other
6. Datum elevation (DF or KB)
KBE = 72,70 AMSL feet
7, Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26 (44-15-11-13) PBU
9. Permit number/approval number
86-18 / 9-062
10. APl number
50- 029-21530
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural --
Conductor 110
Surface 2679
Intermediate 10106
Production --
Liner 1203
Perforation depth:
11070feet Plugs (measured)
BKB 9170feet
11026feet Junk (measured)
BKB 9137feet
Size Cemented
Measured depth
140
27O9
1O136
20 x 30 8 c.y.
13 3/8 3725 c.f.
9 5/8 2110 c.f.
7 435c. f.
measured 10730'-10750', 10794'-10824', 10842'-10867'
9867-11070
True vertical depth
BKB
140
2608
8477
8281-9170
true vertical subsea
8846'- 8948' (three intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
9 5/8" Baker FHL packer at 9805'; 7" Baker SAB packer at 10756';
4 1/2" SSSVat 2036'
I ,E E I. V EiJ
14.
Intervals treated (measured) M~[~ ~ ,~:~;c..'lC'~' ,.'.~
Treatment description including volumes used and final pressure ;~Ja~J~.~0JJ ~ ~Jas CoilS.
Representative Daily Average Production or In!eotion Data
OiI-Bbl Oas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 4460 6934 91 0 841
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
5230 9702 107 0 491
16. Status of well classification as:
Oil X Gas .. Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed /.~,~----~-~ ~;;~~ TitleSuper~isorGravityDrainago
Form 10-404 Rev 06/15/88 w ~
SUBMIT IN DU'PLIdAT~
WELL D-26 (44-1~-11.13~ PBU
ADD'L. PERFORATION OPERATIONS
The following additional interval was Perforated February 24, 1989 using
Schlumberger 3 3/8" carrier guns at 4 spf:
10842'- 10867' MD BKB (8929' - 8948' TVDss)
(Ref. BHCS, 2/6/86)
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to production immediately following perforating operations, then tested.
jm
3/15/89
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
E,~LYON
TEXACO
TO: MOBIL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
B~ CASED HOLE FINAL LOGS
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P,O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111 INDEXED
Date: 03-02-89
T/~: 79861
The following material ls being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
D-26 Completion Record 02-24-89 ~1 10777-10962 Sch 5"
M-23 Production Log 02-23-89 ~1 9400-10056 Sch 5"
W-40 CNL-GR (2.5" Tool) 02-22-89 ~2 9850-10535 Sch 5"
Received
Date
Shirley R. McCurry
INFORMATI ON CONTROL
Wel I Records LR2-1
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
February 27, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in triplicate, are Application for Sundry
Approvals (Form 10-403) requesting approval to
continue producing Well D-26 until a scheduled rig
workover to repair a 9-5/8" packer/PBR leak can be
completed during April, 1989. As a temporary
measure, the inner annulus has been liquid filled to
place an overbalanced hydrostatic pressure
differential on the tubing.
Very truly yours,
Brag~~.W~~
Production Engineering
JAB: JAM: wgp
Enclosures (6)
cc: L. Burke (MB 12-1)
R. B. Laule (MB 12-1)
D-26 Well File
.RECEIVED
;~Ja$~ .Oil & Gas Cons..C0m~/ss~0a
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISsiON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well .
Alter casing ~ Repair well X' Plugging ~ Time extension __ Stimulate ~
Change approved program ~ Pull tubing X Variance x Perforate__ Other __
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development X
Exploratory ~
Stratigraphic ~
Service
6. Datum elevation (DF or KB)
KBE= 72.70 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface 8.
1716'SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval 9.
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effective depth 10.
434' NSL, 725' WEL, SEC. 15, T11N, R13E, UPM
At total depth 11.
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11070 feet Plugs (measured)
true vertical BKB 9170 feet
Well number
D-26 (44-15-11-13) PBU
Permit number
86-18
APl number
5O- 029-2153O
Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11026 feet Junk (measured)
true vertical BKB 9137 feet
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 8 c.y. 140
Surface 2679 13 3/8 3725 c.f. 2709
Intermediate 10106 9 5/8 2110 c.f. · 10136
Production --
Liner 1203 7 435 c.f. 9867-11070
Perforation depth: measured 10794'- 10824'
true vertical subsea
8893'- 8915'
Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9805' with 4 1/2" tailpipe to 10749'
True vertical depth
BKB
140
2608
8477
8281-9170
"~' ~ch0rage
Packers and SSSV (type and measured depth) 9 5/8" Baker FHL packer at 9805'; 7" Baker SAB packer at 10756?
4 I/2" SSSV at 2036'
13. Attachments Description summary of proposal × Detailed operations program ~ BOP sketch
14. Estimated date for commencing operation
N/A
16. If proposal was verbally approved Oil X Gas~
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sig~e~Xd///"~/]/~'~ ~/'k'f~~ Title ManaflerProduction Enflinoerinfl
FOR COMMISSION USE ONLY
Conditi(~s of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test~
Mechanical Integrity Test~
Approved by order of the Commission
Form 10-403 Rev 06/15/88
15. Status of well classification as:
Suspended
Location clearance
Subsequent form required~10-
Commissioner
SUBMIT IN TRIPLICATE
ATTACHMENT
PROPOSED D-26 RIG WORKOVER
ProceOore:
le
2.
3.
4.
5.
6.
7.
8.
9.
Pull SSSV.
Set plug in tailpipe.
Cut the straddle assembly immediately below the sliding sleeve.
Pull the dummy valve from the #1 GLM and circulate the well.
Freeze protect the well.
Set BPV.
MIRU workover rig.
Pull BPV. Circulate diesel from well. Install two-way check valve.
ND tree. NU & test BOP's to 5000 psi.
10. Pull 4-1/2" tubing.
11. Recover the 9-5/8" Baker FHL packer with PBR. Circulate well.
12. RIH with overshot with packoff. Backoff lower latch and reverse
circulate. Reverse "K" anchor.
13. Make 9-5/8" casing scraper runs with tail to 7" packer. Reverse
circulate.
14. Make 9-5/8" gauge ring/junk basket run.
15. Run 4-1/2" straddle completion with GLM's.
16. Latch into "K" anchor. Set packer.
17. Shear PBR. Space out and land tubing.
18. ND B OP's. NU & test tree to 5000 psi.
19. Pressure up and shear valve in GLM.
20. Pump 150 bbls diesel down the annulus and "U" tube diesel to
tubing.
21. Set BPV.
22. Pump down cellar. Release rig.
WORKOVER
B.O.P. STACK CONFIGURATION
13-S/8 IN. TRIPLE RAH STACK
SO00 PSI WP
ATTACHMENT II
_ _
DRILLIN6
ANNULAR
PREVENTER
~ ,,. ~,,t ~,,~ L!
GATE GATE [ '
I I
I I
PIPE RAMS
I I
1 1
PIPE RAMs
,1 I
DRILLING
SPOOL
I I
4 IN. CHOKE LINE
GATE GATE
BLIND RAMS
, I I
WELL D-26 (44-15-11-13~ PBU
Reouest for Variance to Produc~
with Tubin_~ Leak
A tubing leak has been detected in Well D-26 at or near the top packer of the straddle
pack (9835' MD). We propose to continue production from the well with the tubing
leak until:
2)
Bleeding of inner annulus pressure precipitates flow at the surface, or;
A workover of the well can be completed to return the well to a safe
operating condition,
Workover operation planning is currently underway and, with Unit concurrence, a
rig workover of the well can'be completed during the first or second ,quarter of 1989.
~.'JAM
1/18/89
Standc~rd Alaska. "
Production Company
900 East Benson BouJeva,u
P.O. Box 196612
Anchorage, AJaska 99519-6612
i907) 564-5421
January 24, 1989
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal to
perforate the well.
Yours very truly,
J~[ ~. Brown, Supervisor
Gr~gity Drainage
JTB:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
D-26 Well File
A un~ of the or;ginai Sta~da~d Oi! Compar-,¥
Founded in Cleveland Ohlo i~~ !870
STATE OF ALASKA
ALasKA OIL AND GAS CONSERVATION COMMIS$,~N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend
Alter casing ~ Repair well
Change approved program ~
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, SEC. 15, T11N, R13E, UPM
At effective depth
434' NSL, 725' WEL, SEC. 15, T11N, R13E, UPM
At total depth
455' NSL, 746' WEL, SEC. 15, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11070 feet
true vertical BKB 9170 feet
Operation Shutdown ~
Plugging
Pull tubing ~ Variance
5. Type of Well:
Development x
Exploratory
Stratigraphlc.
Service
Re-enter suspended well, ,
Time extension Stimulate
Perforate X Other
6. Datum elevation (DF or KB)
KBE- 72.70 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
D-26 (44.15-11-13) PBU
9. Permit number
86-18
10. APl number
50- 029-21530
'11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11026 feet Junk (measured)
true vertical BKB 9137 feet
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 8 c.y. 140
Surface 2679 13 3/8 3725 c.f. 2709
Intermediate 10106 9 5/8 2110 c.f. 10136
Production --
Liner 1203 7 435 c.f. 9867-11070
Perforation depth: measured 10794'. 10824'
true vertical subsea
8893'- 8915'
True vertical depth
BKB
140
26O8
8477
8281-9170
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9805' with 4 1/2" tailpipa to 10749' /ii~Jaska.-0il & ~a$ C0r~so
' '~'~1 .0~,.0 .,.
Packers and SSSV (type and measured depth) 9 5/8" Baker FHL packer at 9805'; 7" Baker SAB packer at rage
4 1/2" SSSV at 2036'
13. Attachments Description summary of proposal × Detailed operations program
BOP sketch
14. Estimated date for commencing operation I
January 1989
16. If proposal was verbally approved Oil X Gas ~
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~, .~~v~,~¼ ~),,L,~_. Title Supervisor Gravity Draina~7e
Signed
FOR COMMISSION USE ONLY
Conditions o~pproval: Notify Commission so representative may witness
Plug integrity ~ BOP Test . Location clearance
Mechanical Integrity Test
Approved by order of the Commission
15. Status of well classification as:
Suspended
Date
lApproval No. ~,~.~ ,~
Form 10-403 Rev 06/15/88
Commissioner
---- / / /~,-, ..... ,
~,pp?ovea Copy
Returned _
WELL D-26
ADD'L. PERFORATIO~ PROPOSAL
We propose to perforate the following additional interval during January 1989:
10842' - 10867' MD BKB (Ref. BHCS, 2/6/86)
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to production immediately following perforating operations, then tested.
jm
1/19/89
FLOW TUBES
& PACKOFF
BOWEN PACKOFF
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
GREASE LINE
FLOWLINE
VALVE
GREASE
~' MANIFOLD
RISER
BOP
GREASE
PUMP
-...-GREASE
RESERVOIR
Standard Alaska
Production Compan
900 East Benson
P.O. Box 196612
Anchorage, Alaska 99519-66
(907) 564-51 I I
HOUSTON
ARCO
CHEVRON
E~Y~XON
TEXACO
TO: MOBIL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
SAPC CASED HOLE FINAL LOGS
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 01-06-89
Ti: 79697
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
D-26 TEMP/PLS 12-28-88 #1 9500-10850 Atlas 5"
A unit of the original Slondard O~1 Co,npany
Founded in Cleveland, Ohio. in 1870.
Shirley R. McCurry
I NFORMAY ~ ON CONIROL
We~ ~ Records LR2-~
P,c~lu¢ Hon Compo,~¥
900 [¢.~, B.',,~o,, ~ul~' .... d
,907:564 5 ) ) )
INDEXED
DAI. LAS
ARGO S'i'ANDARD
CHEVRON ALASKA PRODUCTION
EXXON D~te: 03/09/88
TEXACO 786/41
TO: 1'#:
MOBIL
PHILLIPS
STATE OF ALASKA
REFERENCE-
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
slgning a copy of this letter and returnlng It to this office:
~'~D-2B Static Gradient 02/19/88 Camco
'~'-- G-24 " " 02/20/88 Camco
~'~ K-13 " " 02/19/88 Camco
R-23 " " 03/05/88 Camco
~ X-16 " " 03/03/88 Camco
~ria Aldridge
INFORt. LATION CONTROL
Well Records LR2-1
Standard Alaska
P~oduction Compan.
900 Eost Benson Boul.
PO Box 196612
Anchoroge. Alosko 99519-6612
!907) 564~5 I 1 !
INDEXED
DALLAS
A~CO STANDARD
CH~.WON ALASKA PRODUCTION
EXXON Date: 08/05/87
TEXACO
TO: TI: 78106
MOBIL
PHILLIPS
STATE OF' ALASKA
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of this letter and returning It to this office:
A-1
A-22
A-26
A-29
A-32
A-35
D-9
D-25
D-26
D-27
D-28
D-29
G-19
G-25
G-31
H-21
H-22
H-24
H-26
J-22
U-2
U-6
U-8
07/09/87 Camco Static Gradient
07/12/87 " " "
07/09/87 " " "
07/11/87 " " "
07/13/87 " " "
07/13/87 " " "
07/21[87 " " "
07/10/87 " " "
07/10/87 " " "
07/07/87 " " "
07/22/87 " " "
07/22/87 " " "
07/08/87 " " "
07/08/87 " " "
07/07/87 " " "
07/25/87 " " "
07/25/87 " " "
07/25/87 " " "
07/25/87 " " "
07/27/87 " " "
07/17/87 " " "
07/17/87 " " "
07/16/87 " " "~-.-.~ ~
U-12 07/15/87' " "/~ ~"
X-2 07/.27187 "/""~ ...~/,,, ,~,~! ~ i
Y-l-2 07/15/87 'y ] O ~- ~.'~/~ ~1
Received , , ~~l I~' ~ ~. ~I ~/ ) Victoria'Aldridge
~~~, lO I V-- ~ I NF~TION CONTR~
Dale , , ,
Sfandmd Alaska
Production Compm
900 Eos~ Be.~on Bou,.
P.O I~ 19661~
Anchoroge. Alaska 99]19-661~
(907) ~64.~111
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: O7/31./87
MOBIL It: 78088
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
Al. A,SkY'-, PPr, i)D[ JC r ION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office=
Temp. 07/20/87 #1 10500-10924 Camco 5"
Temp. 07/20/87 #1 Surf'3150 Camco 2"
Prod. Profile 07/01/87 #1 10250-10650 Camco 5"
Prod. Profile 07/06/87 #1 10550-10880 Camco 5"
Temp. 07/12/87 #1 Surf-3000 Camco 5"
Temp. 07/14/87 #1 0-3000 Camco 5"
Temp. 07/21/87 #1 Surf-2057 Camco 5"
Injection Profile 06/30/87 #1 8600-8975 Camco 5"
Perf. Record 07/26/87 #2 10100-10563 Sch 2"
Spinner 07/14/87 #1 9850-10350 Camco 5"
Injection Profile 07/16/87 #1 9150-9534 Camco 5"
Rece i ved
A un,t ol the o,,g,nol
fov-ded ,n Clevelo,,d. Oh,o, ,,~ 187{)
Victoria Aldridge
INFORMATION CONTROL
Well Records LR2-1
Standard Alaska ~- '~"'
Production Compan
900 East Benson Boule,,~ra
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
May 26, 1987
51'ANDARD
ALASKA PRODUCTION/
Alaska 0il & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of stimulating the well.
Yours very truly,
JAB:JAM~
Supervisor Production Operations
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
D-26 Well File
.... '"7.1.981
Alaska Oil & 6as Oor~s. Comnr]issior~
anchora!]a
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
~ "' STATE OF ALASKA
ALA,_ .,, OIL AND GAS CONSERVATION CON. ,SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed' Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing
Alter Casing [] Other []
2. Name of Operator 5. Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTION COMPANY KBE = 72.70 Feet
3. Address 6. Unit or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4. Location of well at surface
1716' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM
At top of productive interval
120' NSL, 365' WEL, Sec. 15, TllN, R13E, UPM
At effective depth
434' NSL, 725' WEL, Sec. 15, TllN, R13E, UPM
At total depth
455' NSL, 746' WEL, Sec. 15, TllN, R13E, UPM
11. Present well condition summary
Total depth: measured 11070 feet Plugs (measured)
true vertical 9170 feetB~
7. Well number
D-26 (44-15-11-13) PBU
8. Approval number
7-256
9. APl number
50--029-21530
10. Pool
Prudhoe Oil Pool
Effective depth: measured 11026 feet Junk (measured)
true vertical 9137 feetBKB
12.
Casing Length Size Cemented
Structural --
Conductor 68' 20"x30" 8 cu.yds.
Surface 2667' 13 3/8" 3725 c.f.
Intermediate 10094' 9 5/8" 2110 c.f.
Production --
Liner 1203 ' 7"
Perforation depth: measured
10794' - 10824'
true vertical (ss)
8893' - 8915
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth)
9 5/8" Baker FHL packer at 9805";
Measured depth
110'
2709'
10136 '
Stimulation or cement squeeze summary
See attachment
Intervals treated (measured)
True Vertical depth
BKB
110'
2608'
8477 '
435 c.f. 9867' -11070' 8281'-9170'
Alaska 0il & ~as r'~"~'~ Commission
?" ~ake~ SA~ packe~ at 10756'~ ~ 1/2" SSSV at 2036'
Treatment description including volumes used and final pressure
13.
Prior to well operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
1680 1548 0 0 236
Subsequent to operation 5940 4158 0 0 286
14. Attachments .
Daily Report of Well Operations [] Copies of Logs and Surveys Run [i']
15. I hereby certify that the foregoing is true and correct to the best of my knowledge c7~
,t, u erv sor ro uc, o.
Form 10~/~4 Rev. 12-1-85 ~/~/
Date~'~' ?7
Submit in Duplicate
Well D-26 (44-15-11-13) PBU
STIMULATION OPERATIONS
A combination 50-bbl. EDTA/30-bbl. Scale inhibitor matrix squeeze was
performed May 14 1987 on the following perforated interval in Well
D-26. '
10794, _ 10824, MD BKB
Following the treatment the well was left shut in for 24 hours then
returned to production and tested. ,
jm
5/19/87
Standard Alaska
Production Company
900 East Benso,~ Boulevarc~
P.O. Bo~ 19661:2
Anchorage. AIo,,ko 99~19-6612
(~7) 564.51 ! !
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 01/06/87
TO: MOBIL TI: 77644
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The fol lowing material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letteF and returning it to this office:
A.-16 Injection Profile/Flowmeter/Temp
A-23 Temp. 10/24/86 #1
A-23 BoreholeAudio Tracer 10/24/86
A-23 Borehole Audio Tracer 11/06/86
A-23 DFT 11/06/86 #1
B-9 Borehol~ Audio Tracer 11/16/86
D-17 CCL/Perf. 11/23/86 #1
D-18 CCL/Perf. 11/23/86 #1
D-26 Spinner 12/07/86 #1
D-27 CCL/Perf. 11/19/86 al
D'28 CCL/Perf.. 11/20/86 #1-3
E-7 EPL 07/23/86 al
E-9 CCL/Perf. 11/16/86 al
E-9 Cont. Flow Survey 11/29/86 al
E-9 Temp. 11/29/86 al
-31 CCL/Perf. 11/10/86 al
-15 Collar 12/07/86 #1
H-20 CCL/Perf. 10/25/86 #1-2
M-17 Temp. 11/29/86 #1
M-22 CCL 10/30/86 #1
P-14 GR/Correlation 11/07/86 #1
T-I' Injection Profile 11/22-23/86 #1
U-3 Injecion Profile 11/29-30/86 #1
11/26-27/86 al 9900-11182 camco
2700-10100 GO 2"/5"/1"
al 1000-10600 GO 2"
#1 500-10600 GO 1"
3950-10600 GO 5"
#1 1900-3200 GO 5"
8850-10346 GO 5"
10700-11260 GO 5"
10500-10870 Camco 5"
8650-9690 GO 5"
9500-11110 GO 5"
8350-9457 Sch 5"
10600-10980 GO 5"
10500-10905 GO 5"
10500-10905 GO 5"
6980-9228 GO 5"
0-2500 CAMCO 5"
9050-10200 GO 5"
11000-11758 GO 5"
9500-10550 GO 5"
10790-11000 GO 5"
10400-10923 CAMCO 5"
9000-9530 CAMCO 5"
Victoria Aldridge
I NFORMAT I ON CONTROL
Wel I Records LR2-1
5t!
Standard Alaska .~ .....~
Production Compan~
900 East Benson Boule ....a
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
April 13, 1987
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to stimulate the well.
Yours very truly,
JAB:JAM~
Enclosures (9)
cc: J. L. Haas (MB12-1)
D-26 Well File
J. A. Bragg
Supervisor Production Operations
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALAL , OIL AND GAS CONSERVATION COM,..,SSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend ~ Operation Shutdown ~,' Re-enter suspended well [] Alter casing .,~
Time extension [] Change approved program ~ Plugging ~ Stimulate ~ Pull tubing [] Amend order ~ Perforate r~ Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, Sec. 23, TllN, R13E, OPM
At top of productive interval
120' NSL, 365' WEL, Sec. 15, TllN, R13E, UPM
At effective depth
434' NSL, 725' WEL, Sec. 15, TllN, R13E, UPM
At total depth
455' NSL, 746' WEL, Sec. 15, TllN, R13E, UPM
5. Datum elevation (DF or KB)
[Q3E = 72.70
6. UnitorProperty name
Prudhoe Bay Unit
7. Wellnumber
D-26 (44-15-11-13) PBU
8. Permit number
86-18
9. APl number
50--029-21530
10. Pool
PRUDHOE OIL POOL
feet
11. Present well condition summary
Total depth: measured
true vertical
11070
9170
Effective depth: measured 11026
true vertical 9137
feet Plugs (measured)
feet BKB
feet Junk (measured)
feet BE
Casing Length Size
Structural .-.-
Conductor. 68 ' 2 0"x30"
Surface 2667 ' 13 3/8"
Intermediate 10094 ' 9 5/8"
Production --
Liner 1203 ' 7"
Perforation depth: measured
10794' - 10824'
true vertical (subsea)
8893' - 8915'
Cemented Measured depth True Vertical depth
BKB
8 cu.yds. 110' 110'
3725 c.f. 2709' 2608'
2110 c.f. 10136' 8477'
435 C.f.
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9805' with'4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth)
9 5/8" Baker FHL packer at 9805'
9867 ' -11070 '
; 7" Baker SAB packer at 10756'
8281'-9170'
; 4 1/2" SSSV at 2036'
12.Attachments
Description summary of proposal ~] Detailed operations program [] BOP sketch []
13. Estimated date for commencing operation
April/Ma~, 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certifY-that the foregoing is true and correct to the best of my knowledge
Si~ ~~ mitleSupervisor Production Operations Date ,C:~J. A. Bragg Commission Use Only
Conditions of approval Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] LocatiOn clearanceI '-/7 ~_.~2<~.~
·
BY [~![ ~ ~}'~ ~?_.-,, / ~ by order of
Approved by - '"'~-~~ Commissioner the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
Well D-26 (44-15-11-13) PBU
STIMULATION PROPOSAL
A combination EDTA/scale inhibitor squeeze via coiled tubing is proposed
for the following perforated interval in Well D-26.
10794' - 10824' MD BKB
Following the treatment the well will be left shut in for 24 hours, then
returned to production and tested.
jm
4/13/87
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off
Blind Rams
Cutter Rams
2' Chicksan (Kill Line)
Slips
Pipe Rams
Pump-In Sub
(C irc ula te/R e turns)
W ell Head
Swab Valve
Standard Alaska . ~---.
Production Compan
900 East Benson Bou, J
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 19, 1986
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
kttention: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations,
for the above-named well. This contains our subsequent report of
perforating the well.
PFB: J~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
D-26 Well File
Yours very truly,
P. F. Barth, Supervisor
Reservoir/Production
Surveillance Unit I
A unit of the or,ginal Standard Oil Company
Founded in Cleveland Ohio ,n 1870
STATE OF ALASKA
ALASK? IL AND GAS CONSERVATION COMM! 'ON
REPORT OF SUNDRY WELL OPERATIONS
~ Perforate
1. Operations performed: Operation shutdown '~' Stimulate ~ Plugging ~ .....
Alter Casing ~ Other
2. Name of Operator 5.
STANDARD ALASKA PRODUCTION COMPANY
3. Address 6.
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface 7.
1716' SNL, 1692' WEL, Sec. 23, TllN, R13E, gPM
At top of productive interval 8.
120' NSL, 365' WEL, Sec. 15, TllN, R13E, UPM
At effective depth
434' NSL, 725' WEL, Sec. 15, TllN, R13E, UPM
At total depth
455' NSL, 746' WEL, Sec. 15, TllN, R13E, UPM
Datum elevation (DF or KB)
14BE = 72.70 Feet
Unit or Property name
Prudhoe Bay Unit
Well number
D-26 (44-15-11-13) PBU
Approval number
184
9. APl number
50-- 029-21530
10. Pool
Prudhoe Oil Pool
11. Present well condition summary
Total depth' measured
true vertical
11070 feet Plugs (measured)
9170 feetBKB
Effective depth: measured
true vertical
11026 feet Junk (measured)
9137 feetBKB
12.
Casing
Structural
Length Size Cemented Measured depth
m--
True Vertical depth
BKB
Conductor 68' 2 0"x30"' 8 cu.yds. 110'
Surface 2667' 13 '3/8" 3725 c.f. 2709'
Intermediate 10094' 9 5/8" 2110 c.!f. 10136'
Production --
Liner 1203' 7" 435 c.f. 9867'-11070'
110'
2608'
8477'
8281'-9170'
Perforation depth: measured
10794' -- 10824'
true vertical (subsea)
8893' - 8915'
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9805' with 4 1/2" tailp±pe to 10749'
Packers and SSSV (type and measured depth)
9 5/8" Baker FHL ~oack.er' @ 9805'; 7" Baker SAB packer @ 10741'
Stimulation or cement squeeze summary
1/2" SSSV @ 2036'
Intervals treated (measured)
Treatment description including volumes used and final pressure
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
6260 4613 0 0
Tubing Pressure
301
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run
15.1 hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /. i, Title Supvr. Res/Prod. Surveillance I Date
Form 10-404 Rev. 12-1-85 Submit in Duplicate
PERFORATING DATA - Well D-26 (44-15-11-13) PBU
7/20/86
Pressure tested tubing and inner annulus.
7/30/86
8/14/86
Installed and tested lubricator to 3500 psi for all well
work. Rigged up Gearhart and perforated the following
interval for initial production using 3 1/8" hollow-steel
carrier guns at 4 spf:
10794' - 10824' MD (8893' - 8915' TVDss) BHCS/GR, 2/6/86
Put well on production and tested.
Shut in well for initial static pressure survey.
8/16/86
Ran initial static pressure/temperature survey at 8800'TVDss.
9/9/86
Set and tested SSSV in ball valve nipple at 2036'.
Well on production.
jm
9/11/86
Standard Alaska .....
Production Company
900 East Benson Boulevo
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
June 13, 1986
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal to
perforate the well.
Yours very truly,
PFB:jAMi~~%
Enclosures (9)
cc: J. L. Haas (MB12-1)
D-26 Well File
/4
P. F. Barth, Supervisor
Reservoir/Production
Surveillance Unit I
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION COMMI,_,olON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon -- Suspend L-_ Operation Shutdown -- Re-enter suspended well ' Alter casing -
Time extension :_-_ Change approved program .... Plugging 7: Stimulate" Pull tubing ' Amend order '- Perforate × Other .
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1716' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPH
At top of productive interval
120' NSL, 365' WEL, Sec. 15, TllN, R13E, UPM
At effective depth
434' NSL, 725' WEL, Sec. 15, TllN, R13E, UPM
At total depth
455' NSL, 746' WEL, Sec. 15, TllN, RZ3E, UPM (corrected
11. Present well condition summary
Total depth: measured
true vertical
11070 feet Plugs (measured)
9170 feetBKB
5. Datum elevation (DF or KB)
KBE = 72.70 feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
D-26 (44-15-11-13) PBU
8. Permit number
86 -18
9. APl number
50-- 029-21530
10. Pool
Prudhoe Oil Pool
Effective depth: measured 11026 feet Junk (measured)
true vertical 9137 feet BtCB
Casing Length Size Cemented Measured depth True Vertical depth
Structural -- BKB
Conductor. 68' 20"x30" 8 cu.yds. 110' 110'
Surface 2667' 13 3/8" 3725 c.f. 2709' 2608'
Intermediate 10094' 9 5/8" 2110 c.f. 10136' 8477'
Production __
Liner 1203' 7" 435 c.f. 9867'-11070' 8281'-9170'
Perforation depth: measured
true vertical
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9805' with 4 1/2" tailpipe to 10749'
Packers and SSSV (type and measured depth)
9 5/8" Baker FHL 3~acker @ 9805'; 7" Baker SAB packer @ 10741'; 4 1/2" BVN @ 2036'
12.Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch ~
13. Estimated date for commencing operation
June/Jul 1986
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certif
SigneU
th,~_at the,,fore~fng is true and correct to the best of my knowledge
/~-~/~~ Title Supvr. Res./Prod. Surveillance I Date
P. F. Barth
Commission Use Only
Conditions of approval
Approved by
Notify commission so representative may witness
:--: Plug integrity ~ BOP Test
Approval No.
Location clearance / ~
>-%! :,,:~ ,,> 'F ;
~ by order of
Commissioner the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
Well D-26 (44-15-11-13) PBU
INITIAL PERFORATING PROPOSAL
We propose to perforate the following interval for initial production
during June/July 1986 at 4 spf:
10794' - 10824' MD (8893' - 8915' TVDss) Ref. BHCS/GR, 2/6/86
A lubricator will be installed and tested to 3500 psi for all well
work. A SSSV will be set and tested in the ball valve nipple at
2036' at the completion of operations.
jm
6/12/86
BASIC SYSTEM MAKEUP
BOWEN PACKOFF'
GREASE SEAL
FLOWTUBE
PUMP
F:LOWLINE
FLOWLINE I
VALVE
/ GREASE LINE
GREASE
'MANIFOLD
RISER
GREASE
RESERVO~
/-
BOP t
SOHIO ALASKA PETROLEUM COMPANY
DALLAS
ARCO
CHEVRON
E~x:ON
To DAL/UNIT/STATE: TE;CACO
(-.Ha r a r hon) MOBIL
PHILLIPS
STATE 0F ~
BP~
3111 "C" STREET
ANCHORAGE. ALASKA
TELEP~-.~ONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 03/13/86
T#: 76933
GEOSCIENCES
REFERENCE._
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
DAL/UNIT/STATE:
~A-26
"~ D-26
'"~ N-2
~X-9
~Y-6
~Y-10
DFT 02/21/86 #1 10400-11020 GO 5"
GR 02/11/86 #3 9700-10900 GO 5"
Gas Lift Temp. Survey 03/08/86 #1 3050-8750 Camco 5"
Temperature(Pump-in) 03/5-6/86 #2 12000-12500 Camco 5"
Injection Profile-SPINNER 02/15/86 #1 10600-11332 Camco 5"
Temperature(Pump-in) 02/-1/86 #1 9150-10153 GO 5"
R£CEIVED
ictoria Aldridge LR2-1
INFORMATION CONTROL
WELL RECORDS LR2-1
SOHIO ALASKA PETROLEUM COMPANY
DAT.,LAS
ARCO
CHEVRON
EX~ON
3 1 1 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
TO:
DA~/UNIT/ TEXACO
STATE: MARATHON
MO B IL
Date:
T#:
3-04-86
76920
PHILLIPS
*STATE OF AK
BPAE (TransmitOal Only)
GEOSCIENCES'
*Date to State
Via Drilling'
REFERENCE:
SOHIO OPEN HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
gAL/UNIT/STATE:
D-26 DIL 2-06-86 10142-11074 GO #1
D-26 BHCS 2-06-86 10142-11050 GO #1
D-26 CDL/CNL-poro 2-06-86 10142-11033 GO #1
D-26 CDL-raw 2-06-86 10142-11033 GO #1
D-26 Laserlog 2-06-86 10150-11000 GO
5" & 2"
5" & 2"
5" & 2"
5" & 2"
5"
STATE ONLY: DIRECTIONAL SURVEYS
Magnetic Single Shot Directional Survey Date: 1-22-86 Job(/:
Gyroscopic Direction~u~~v~__ ~: 2-27-86 Job#:
· "~~,_. _ _ ~[~~CATh'I~ PERKINS LR 2-1
a[c[,vEo 1 2 198 INFO~TION CONTROL
OAT[ / ~ , [~LL ~CO~S LR2-1
Anchorago
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
March ll, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C.V. Chatterton
Well D-26 (44-15-11-13 ) PBU
Gentlemen:
Enclosed in duplicate is Form 10-407, Well Completion Report, for
the above named Well together with the Daily Drilling Reports, Well
Logs and Directional Survey.
This well has been comPleted as a non-perforated oil well. ~
Yours very truly,
SOHIO ALASKA PETROLEUM COMPANY
R. S~ Allan
Division Drilling Engineer
RSA/MAW/hh/O140D
Enclosure
cc: D. Walters Jan Martin
Drilling Well File #17
RECEIVED
MAR ! 2 1986
Alaska 0il & Gr.,ts C~os. Commission
STATE OF ALASKA _ ~
' ALA: AND GAS CONSERVATION Ci~.VIISSION
,L COMPLETION OR RECOMPLETION' EPORT AND LOG
Status of Well
OIL ~j~ GAS []
SUSPENDED [] ABANDONED [] SERVICE []
Classification of Service Well
2. Name of Operator
SOHIO Alaska Petroleum Conpany
3. Address
P.O. Box 196612 Anchorage, Alaska
99519-6612
4. Location of well at surface
1716 SNL 1692 WEL SEC 23 TIIN R13E L~
At Top Producing Interval
5160 SNL 365 WEL SEC 15 TIIN R13E %~4
At Total
48 5
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 72.70'
12, Date Spudded
1-21-86
I.OCAT I OIX S
VERIFIED ]
Surf. ~ ]
l
6. Lease Designation and Serial No.
ADL28284
17. Total Depth (MD+TVD)
110 70MD 91~0'TVD
7. Permit Number
86-18
8. APl Number
5o- 029-21530
9. Unit or Lease Name
Prudhoe Ba_v Unit
10. Well Number
D-26 (44-15-11-13)
11. Field and Pool
Prudhoe Bay Field
Prudhoe Oil Pool
PBU
13. Date T.D. Reached I 14, Date Comp.. Susp. or Aband, I 15. Water Depth, if offshore 16. No. of Completions
2-6-86 2-12-86 I N/A. feet MSL One
18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20, Depth where SSSV set I 21. Thickness of Permafrost
l1026'MD 9137'TVD YES~q NO[]I 2036' feetMDI 20001
22. Type Electric or Other Logs Run
DIL, BHCS, CDL/CNL- poro,
CDL - raw, Laser Lo~
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" ' Surfae~ 110 '
13-3/8"
9-5/8"
725 "
475
VII
29#
IConducto]
L-80 ,
L-80
L-80
Surfac~ 12709' t7k"
I
9867' I ll070'
24. Perforations open to Production (MD+TVD of Top and Bottom and
interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
12.65L-8,
) 10748 '
10741'
9805' (Upper)
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED
13-3/8" x 9-5/8"1285 cu f~ Permafrost "C"
I followed bv 125 bbls of
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested
Flow Tubing I Casing Pressure
I
Press.
PRODUCTION FOR OIL-BBL
'TEST PERIOD I~ '
· CALCULATED I~ OIL-BBL
24-HOUR RATE '~
GAS-MCF
GAS-MCF
28. CORE DATA
WATER-BBL
CHOKE SIZE GAS-OIL RATIO
OIL GRAVITY-APl (corr)
WATER.BBL
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RF.rr!vrD
MAR 1 2 1986
Oil ,~ ' · : -- uOIlltlli~O~
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
NAME
Sag
Shublik
Zone 4
(Top of
Ivishak/
Salderochit)
GEOLOGIC MARKERS
TRUE VERT. DEPTH
8498'
8523'
MEAS. DEPTH
10164 '
10199 '
10313 '
8608'
30.
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
31 LIST OF ATTACHMENTS
32
I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~) .~ ~ Division Drlg.
- - Title _ F:ng~ n_eer
__
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and :24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached suPplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jebtion, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Sohio Daily Drilling Report -- PBU
January 21, 1986 at 0600 hours
Rig' Nabors 18-E
Well- D-26 (44-15-11-13)
AFE # 120378
0600 Depth' O'
Day' -2
24-Hour Ftg' O'
Water Used- 900
Current Operation- Mixing mud.
Accept rig at 2000 hrs. 1/20/86. Mixing spud mud.
MUD TYPE- WT- VIS- PV- YP- FL- SOLIDS' TEMP' °F
SURVEY MD ANGLE DIRECTION TYD SECTION
COORDINATES
0576H'
DLS
Sohio Daily Drilling Report -- PBU
January 22, 1986 at 0600 hours
Rig' Nabors 18-E
Well' D-26 (44-15-11-13)
AFE # 120378
0600 Depth' 1480'
Day: 1
24-Hour Ftg' 1370'
Water Used' 2800
Current Operation- Drilling.
Spud D-26 at llO0 hrs. 1/21/86. Drill to 539'. Trip for bit.
Drilling at 1480'.
MUD TYPE- WT'8.9 VIS:220 PV:15 YP:60 FL'14 SOLIDS:4, 5 TEMP'45°F
..S. URVEY MD ANGLE DIRECTION 'TVD~ SECTION COORDINATES
DLS
0576H-
Sohio Daily Drilling Report -- PBU
January 23, 1986 at 0600 hours
Rig' Nabors 18-E
Well' D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 2715'
Day: 2
24-Hour Ftg: 1235'
Water Used: 1200
Current Operation' Ci rcul ati ng.
Drilled to 2715'. Short trip, POH. Ran 68 its. 13-3/8" casing
to 2709'. Prepare to cement.
MUD TYPE- WT'9.4 VIS:120 PV:14 YP'20 FL-20 SOLIDS:6.5 TEMP-S1 °F
SURVEY MD ANGLE DIRECTION TVD SECTION · COORDINATES
DLS
0576H-
Sohio Daily Drilling P. eport -- PBII
January 24, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 (44-15-11-13 )
AFE # 120378
0600 Depth: 2715'
Day: 3
24-Hour Ftg: O'
Water Used: 1500
Current Operation: Nipple up BOPE.
Cemented 13-3/8" casing with 1690 sks Permafrost E followed by
500 sks Permafrost. Did not bump plug. Perfbrmed lO0 sks top
job. Installed wellhead and BOPE.
MUD TYPE- WT:9.0 VIS:35 PV:5 YP:5 FL:16 SOLIDS:4.5 TEMP:N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
0576H:
Ri§' Nabors 18-E
Well' D-26 /44-15-11-13)
Sohio Daily Drilling Report -- PBU
January 25, 1986 at 0600 hours
AFE # 120378
0600 Depth' 2715'
Day' 4
24-Hour Ftg' O'
Water Used' 875
Current Operation- Drilling cement.
Repair Hydril. Test BOPE. RIH and drill cement from 1486 to
2420'.
MUD TYPE- WT'9.0 VIS'35 PV-5 YP'5 FL-16 SOLIDS:4.5 TEMP-N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES
DLS
0576H-
Sohio Daily Drilling Report -- PBU
January 26, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 ~44-15-11-13)
AFE # 12037~
0600 Depth: 4060'
Day: 5
24-Hour Ftg: 1345'
Water Used: llO0
Current Operation: Drilling.
Drilled float equipment and new hole to 2750' Ran LOT to .7
psi/ft. Drill to 3416'. Trip for bit. Drilli~'g at 4060'.
MUD TYPE- WT:9.1 VIS:35 PV:4 YP:15 FL:21 SOLIDS:5.5 TEMP: N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
1 2900 3.4 S84.9W 2900 5
3 31 52 8.8 N87W 3151 25
5 3403 10.1 N84.2W 3399 57
7 3649 13.8 N81.4W 3640 105
9 3896 17.5 N78.9W 3878 167
SO. 53
S1.20
N1.70
N8.99
N20
6 1.70
29 1.34
64 1.88
114 1.68
178 2.10
0576H:
Sohio Daily Drilling Report -- PBU
January 27, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 5800'
Day: 6
24-Hour Ftg' 1740'
lJater Llsed: 1500
Current Operation: Drilling.
Drill to 4997'. Trip for bit. Drilling at 5800'.
MUD TYPE- WT:9.4+ VIS:37 PV:5 YP:18 FL:18 SOLIDS:8.3 TEMP:74°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
11 4209 22.9 N76.8W 4172 270 43
13 4520 30 N75.4W 4451 403 75
15 4832 39 N72.9W 4708 574 1 21
17 5429 45.1 N71 . 5W 51 37 982 250
284 1.89
418 2.51
586 3.41
980 1.35
0576H:
Sohio Daily Drilling Report -- PBU
January 28, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 6070'
Day: 7
24-Hour Ftg: 270'
Water Used: 1000
Current Operation: D-Drilling.
Drill to 5989'. Trip for BHA. Dynadrill to 5991'. Plugged
Teleco collar. POH wet. RIH. Dynadrilling at'6070'.
MUD TYPE- WT:9.6 VIS:42 PV:7 YP:25 FL:18 SOLIDS:9.5 TEMP:72°F
SURVEY 'MD ANGLE DIRECTION TVD' SECTION COORDINATES DLS
18 5903 51~2 N70.SW 5444 1339 367 1322 0.67
0576H:
Rig: Nabors 18-E
Wel 1 · D-26 144-15-11-13)
Sohio Daily Drilling Report -- PBU
January 29. 1986 at 0600 hours
AFE # 120378
Current Operation-
0600 Depth: 6865'
Day: 8
24-Hour Ftg: 795'
Water Used' 1650
POH with Dynadrill. PU new BHA and RIH. Drilling at 6865'.
MUD TYPE- WT-9.5+ VIS-40 PV-7 YP-9 FL'll SOLIDS:8.5 TEMP-75°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
19 6024 48' 8 N66,9W 5522 1430 401 1408
20 6096 46,2 N63;lW 5571 1483 423 1456
21 6587 48 N61 . 7W 5906 1843 590 1774
0576H-
DLS
3.30
4.85
0.42
Sohio Dail.y Drillinq Report -- PBU
Jan~lar.y 30, 1-986 at 0600 hours
Rig: Nabors 18-E
~,lell- D-26 !44-15-11-13)
AFE # 120378
0600 Depth: 7710'
Day: 9
24-Hour Ftq: 845'
Water Used: 1900
Current Operation: Drilling 12-1/4" hole.
Drill to 6971'. Trip for bit. Drilling at 7710'.
MUD TYPE- WT:9.6 VIS:37 PV:6 YP:~ FL:6 SOLIDS:9 TEH?:75°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORD I NATES DLS
22 6895 47.3 ~,.~62.4W 6113 2070 697
23 7401 45.9 N58.9~ 6461 2438 877
1976 0.28
2296 0.57
05 761-1:
Sohio Daily Drilling Report -- PBU
January 31. 1986 at 0600 hours
Rig: Nabors 18-E
Well- D-26 {44-15-11-13 )
AFE # 120378
0600 Depth' 8863'
Day' 10
24-Hour Ftg' 1153'
Water Used' 1925
Current Operation: Drilling 12-1/4" hole.
Drilled to 7784'. Trip for bit. Drilling at 8863'.
MUD TYPE- WT:9.7 VIS'38 PV-8 YP-5 FL'6 SOLIDS:lO TEMP-85°F
SURVEY MD ANGLE DIRECTION ' TVD SECTION
COORD I NATES
DLS
24 7714 43.9 N61W 6682 2659
25 8210 41.7 N60, 3W 7047 2994
26 8713 39.1 N60.3W 7431 3319
987
1132
1313
2487
2780
3062
0.8
0.5
0.4
0576H'
Rig: Nabors 18-E
Well: D-26 144-15-11-13)
Sohio Daily Drilling Report -- PBU
February l, 1986 at 0600 hours
AFE # 120378
0600 Depth: 9625'
Day: ll
24-Hour Ftg: 762'
Water Used: 2100
Current Operation' Trip for bit #12~
Drilled to 9003'. Trip for bit and BHA. Drilled to 9625'.
for bi t.
MUD TYPE- WT:9.7 VIS:36 PV:6 YP:5 FL:7 SOLIDS:lO TEMP:80°F
POH
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
27 8940 38.3 N59.9W 7608 3461
28 9215 40.4 N58.9W 7821 3635
29 9474 41.8 N57.1W 8016 3805
1384 3185 0.37
1473 3335 0.80
1563 3480 0.71
0576H:
Sohio Daily Drilling Report -- PBU
February 2, 1986 at 0600 hours
Rig- Nabors 18-E
Well' D-26 C44-15-11-13)
AFE # 120378
0600 Depth' 9946'
Day' 12
24-Hour Ftg' 321'
Water Used: 1575
Current Operation- Drilling 12-1/4" hole.
Drilled to 9657'. Lost pump pressure. POH. Found leak in
stabilizer. Drilling at 9946'.
MUD TYPE- WT'9.8 VIS:42 PV-9 YP'5 FL'5.6 SOLIDS'lO.5 TEMP-O°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
30 9738 45.4 N55W 8207 3986 1664 3631 1.47
0576H'
Sohio Daily Drilling Report -- PBU
February 3, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 10,150'
Day: 13
24-Hour Ftg: 204'
Water Used: 1750
Current Operation: Running 9-5/8" casing.
Drilled to lO,150'. Short trip. CBU. POH. Running 9-5/8"
casing.
MUD TYPE- WT:9.7 VIS:38 PV:6 YP:5 FL:5.6 SOLIDS:lO TEMP:O°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
31 9926 43.6 N54.6W
32 10087 42.5 N53.6W
8341 4117 1740 3739 0.97
8459 4226 1805 3828 0.80
0576H:
Sohio Daily Drilling Report -- ?BIJ
February 4, 1986 at 0600 hours
Rig' Nabors 18-E
Well' D-26 (44-15-11-13)
AFE # 120378
0600 Depth' 10150'
Day' 14
24-Hour Ftg' O'
Water Used' 1050
Current Operation' C/O Cement.
Ran 9-5/8" casing to 10,135 and cemented. Installed and tested
packoff. Tested BOPE. ~IH and tested casing to 3000 psi.
Drilling cement and float equipment.
MUD TYPE- WT'9.4 VIS'34 PV:4 YP'3 FL'9 SOLIDS:7 TEMP' °F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
0576H'
Sohio Daily Drilling Report -- PBU
February 5, 1986 at 0600 hours
Rig- Nabors 18-E
Well' D-26 (44-15-11-13)
AFE # 120378
0600 Depth' 10,746'
Day: 15
24-Hour Ftg' 596'
Water Used' 2100
Current Operation' Drilling.
Test 9-5/8" casing to 3000 psi. Drill cement from 10,065' to
10,135'. Drill to 10,689'. Lost circulation. Spot LCM pill.
Drilling at 10,746'.
MUD TYPE- WT'8.9+ VIS:31 PV:4 YP'4 FL'lO SOLIDS'4.5 TEMP'81°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
0576H'
SOhio Daily. Drilling Report -- PBU
February 6, 1986 at 0600 hours
Rig' Nabors 18-E
Well- D-26 (44-15-11-13)
AFE # 120378
0600 Depth' 11,070'
Day' 16
24-Hour Ftg' 324'
Water Used' 0
Current Operation' Logging.
Drill to 11,070'. Short trip. CBU. POH. Running open hole
logs.
MUD TYPE- WT:8.9+ VIS-34 PV-6 YP-5 FL-9 SOLIDS'4.5 TEMP'85°F
SURVEY MD ANGLE DIRECTIO~ TVD SECTION
COORDINATES DLS
0576H'
Sohio Daily Drilling Report -- PBU
February 7, 1986 at 0600 hours
Rig: Nabors 18-E
Well: D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 11,070'
Day: 17
24-Hour Ftg: O'
Water Used: 700
Current Operation: POH
Completed open hole logging. Made wiper trip. Ran 7" liner
with shoe at ll,070' and liner hanger at 9867. Cemented with
368 sks Class G with 5% Kcl. POH.
MUD TYPE- WT:8.9+ VIS:34 PV:6 YP:5 FL:9 SOLIDS:4.5 T£MP:N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION
, ,,
COORDI NATES
DLS
0576H:
Rig: Nabors 18-E
Well: D-26 (44-15-11-!3)
Sohio Daily Drilling Report -- PBll
February 8, 19~,5 at 0600 hours
AFF_ # 120378
0600 Depth: 11,070'
Day: 18
24-Hour Ftg: O'
Water Used' 1225
Current Operation: Drilling thru liner hanger.
RIH with 9-5/8" casing scraper and drill cement from 9469 to TOL
at 9867'. Trip for bit and BHA. Drilling cement inside liner.
MUD TYPE- WT:9.0 VIS:38 PV:7 YP:7 FL:ll SOLIDS:5 TEMP:N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDInaTES
0576H:
DLS
Sohio ~aily Drilling Report -- pBI]
February ~o, 1986 at 0600 hours
Rig' Nabors 18-E
Well' D-9-6 (a4_15-11-13)
AFE # 120378
0600 Depth' 11,026'
Day' 19
24-Hour Ftg: O'
Water Used' 1225
Current Operation' POH laying down DP.
MUD TYPE-
Drill cement from TOL to 9925'. Test lap to 3000 psi. Drill
cement and float equipment from !0,883 to 11,027'. Test liner
to 3000 psi. CBU. Displace hole wi th 8.9 pPg NaC1. Test liner
and lap to 3000 psi. POH.
WT-8.9 VIS'
PV' YP' FL'
SOLIDS'
TEMP.°F
SURVEY MD
ANGLE
DIRECTION TVD
SECTION
COORDInaTES
DLS
...._====.
0576H'
Sohio Daily Drilling Report -- Pf~U
February 10, 1986 at 0600 hours
Rig: Nabors 18-F.
Well: D-26 (44-15-11-13)
AFE # 120378
0600 Depth: 11,026'
Day: 20
24-Hour Ftg: O'
Water Used: 1050
Current Operation: Perforate.
POH. Ran CBL log after 2 tool failures. RU lubricator on
shooting flange. RIH with perforating .qun.
MUD TYPE- WT:8.9 VIS: PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
·
0576H:
Sohio Daily Drilling Report -- PBU
February l l, 1986 at 0600 hours
Rig: Nabors 18-E
Well' D-26 (44-15-11-13)
AFE # 120378
0600 Depth' 11,026'
Day' 21
24-Hour Ftg' O'
Water Used' 42
Current Operation' Rigging down wireline tools.
Perforated 10,730 to 10,750'. RIH with 4-1/2" tubing and
straddle packers. Ran GR/CCL to confirm packer depth.
MUD TYPE- WT:8.9 VIS' PV- YP- FL' SOLIDS' TEMP-°F
SURVEY MD ANGLE DIRECTION
TVD SECT ION COORD I NATES
DLS
.
0576H'
Sohio Daily Drilling Report -- PBU
February 12, 1986 at 0600 hours
Rig' Nabors 18-F.
Well- D-26 (44-15-11-13}
AFE # 120378
0600 Depth' 11,026'
Day: 22
24-Hour Ftg: O'
Water Used: 1050
Current Operation' Displacing annulus with 9.6 ppg NaCl brine.
Land 4-1/2" tb§. Confirm packer depth with GR/CCL. Packers set
at 10,741 and 9805' wireline measurement. Set packers, test
annul us to 2000 psi. Nipple down BOP's. Set tree. Open sleeve
and displace annul us wi th 9.6 ppg NaC1 brine.
MUD TYPE- WT:9.6 VIS' PV- YP' FL' SOLIDS' TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
.,,
0576H'
Sohio Daily Drilling Report -- PBU
February 13, 1986 at 0600 hours
Rig' Nabors 18-E
Well' D-26 ~44-15-11-13)
AFE # 120378
Current Operation'
0600 Depth' 11,026'
Day: 23
24-Hour Ftg: O'
Water Used: 0
Displace annulus with 9.6 ppg NaC1 and tubing to diesel. Closed
sliding sleeve. Downsqueezed annulus with Permafrost C cement
followed by 125 bbls dead crude. Released from D-26 at 1500
hrs. on 2/12/86.
MUD TYPE- WT: VIS- PV- YP- FL' SOLIDS' TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDInaTES DLS
0576H-
SOHIO ALASKA PETROLEUM C~
PAD. D (Gzl · 15. I1.
D 26
Controlled
Drilling
Consultants,
Inc.
LES HENDERSON
333-1552
RECEIVED
CON',dOLLED DRILLING CONSULT ,.,,TS, INC.
4234 KINGSTON DR.
AnchOrage, Alaska 99504
(907) 333-1562
February.Il, 1986
Mr. Brian Rose
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
RE: Magnetic Single Shot Survey
Job No. 0186--022
Well D-26 (44-15-11-13)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: 01-22-86 to
Dear Mr. Rose:
Please find enclosed the "Original" and six (6) copies of our
Magnetic Single Shot Survey on the above well. The method used
in calculating this survey was Radius of Curvature. The depth
of the survey was 2700 to 10087.
Thank you for giving us this opportunity to be of service.
Yours very truly,
Controlled Drilling Consultants, Inc.
Wayland Yancy
Directional Supervisor
COMPUTED FOR CDC E~Y OCEANTEC~..)
RECOK'.D 8:-: SUR?EY
TRUE
~]'
D~PTH ~N~LE PEPTH
A.cSSUi'iED VERTICAL TO 2700 FT,.
2908, 3 24 2899,88 2827,18
2994 4 48 299~,64 ~920~94
3152 6 48 3150,82 3078, i2
J403 lO 6 .3~99,2~ 7326,54
~494 1~ 12 3488,67 34~5,97
3649 1~ 48 3639,98 3567,28
3805 15 36 37S8,87 37i8,17
4053 20 0 4026,75 3954, 05
42 09 22
,.,4 4 i
4365
4520 ,30 0 4450,51 4~77,8I
4675
4923 4
5429 48 6 5
5903 5I !2 5444,26 5~7i ,56
6024 48 18 5~2'2,44 5449.74
RECEIVED
011 & (~s Cons ¢ornmimon
Armoag~
t,.i 0 0 E
:'!"OYAL COORrJ t HA'T'E S
,000
,08 S ,00
,24 f~ 48,88
~,'70 N 64,t6
3,86 N 80,83
20~36 H t78.47)
0,38 N 227,94
7,56 N ~,46,F6
4,7t 14 4i7,66
,:~"', ':~,, '? N 642, J: i
5..
12,
80.
5' 05
598
iOll
371
N~8, DRZFT
740~ ~5 54
9215 40 24
9474 4 ~ 48
97~8 45 24
9926 43 36
THE FOLLOWi
F~ECO~O C?
TOTAL COORDINATES
6i ~ ~.~, O1 6040
~,4~. 0 .... 67
8016 O0 7"
NG tS EXTRAPO(..RTEO TO 1* ....
DOTTOM HOi. E
C L 0 S ij R E S
r3;
15t6,0S N 73 47 20
2094,76 N '='*
2675,98 N
3009,3i N
3472,98
~646, Oe?, N
3814,65 H 65 ,~E: ~5 W
~994, I5 H
4i23,75
42..3! ,7! N 6-:4, 4:5 ~.5
S E rj ? ~
L-.~-.
...........
% 4 7" i 5! 4
3 '99,3,9 2
4 i :23.7 ,.,n
_
.....
42'"
,::, i . 71
....
....
.....
.....
....
DEPTH
472',
', 87.3
~273
t573
i87~
2~73
2~
2273
23?3
257~
3275
3478
TRUE
273,
i 273,
i 573,
i 673,
i 873,
2073,
2:]73
2473
2573
267~
287~
3073,
3i73,
3273,
~473,
0
0
O
O
0
0
O
0
O
0
0
0
0
o
0
0
0
0
0
0
0
I
TOTAL
COORDINATES
,OO
.o0
.oo
00
,00
.00
. Of.)
,00
,0o
,00
,00
.00
.00
.Of9
,0o
.00
,00
.;S5
.05
,24
S
s
S
S
S
S
S
S
S
S
S
S
S
s
S
S
S
S
S
S
s
S
s
s
N'
S
S
S
4"~ J ~
o i 9 O
5790
6243
65~8
66:37
....,- 7 0 }
7 9 75
99.36
,.,,,,,. ;22 {~
· :, , 7 2
! 0~7.84 k~
,4o~, ,07 ,,,..
:: 0:3;:2', 4:::< Li
23 06 ~ 7
TRUE
D~PTH DEPTH ':' :" "" "~'
8244 P873, 70¢0
299,4.3 N 3920.9.3 t~
409,77 N :~229,~6
495,67 N 3~73.6: k~
iNTERPOL~TE£~ '"'"':,~ ""
T RLiE
U~,:EL~. VEP. T ~
DEPTH DEPTH
~OOO ~977,
~OOO 5507,
7000 6t84,
9000 7655,
0087 8459,
HORIZONTAL VIEW
SOHIO ALASKA PETROLEUM
.................... -WELL D-26 (44-15-11-1:5)
RADIUS OF CURVATURE
MAGNETIC SINGLE SHOT
___~C__ LE.JJ~.-_- I000' . ....
FEBRUARY 6, 1986
.
-i .... i~ i'i-l.-'~ i '-. ALL DI~PTHS $I
............. _~ .......... i . . i . _ ARE VD
March 11, 1986
Mr. Michael D. Martin
Standard AK Production Company
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Our BOSS Gyroscopic Survey
Job No. AK-BO-60009
Well: D-26 (Sec.23 TllN R13E)
Prudhoe Bay, Alaska
Survey Date: February 27, 1986
Operator: D. Harger
Mr. Martin:
Please find enclosed the "Original" and sixteen (16) copies of our
BOSS Gyroscopic Survey on the above well.
Thank you for giving us this opportunity to be of service.
Sincerely,
NL SPERRY-SUN, INC.
Ken Broussard
District Manager
Enclosures
NL Sperry-Sun/NL Industries, Inc.
RO. Box 190207, Anchorage, Alaska 99519-0207, Tel. (907) 522-1737
STANDARD Al.::; F:'Fi:OD. CO.
PRLI D H 0 E BAY
AL. AoF~.A
CAI ....L:.';EC.:'f' I (iN CAI_CI...ILA TEI] AI....ONG F'... L U-.=,'-'UR"'E..'
ANCI'.flZfRAGE ALASKA
t..-: 0 M P I...I T A T I C.f N D A'T E
DAT'E OF: Si...IF:;.:VEY FEBRI...IARY .'.-.':7~ 1986
B 0 ::.-..; S.-; G Y R 0 S C 0 F' I C .S:; U R V E Y
dOB NLIHBER AI--':.'-~BO-/'_-,O00?
KELLY
F.)F:'EF;~ATOR--D. F.IARGER '
]'IRI_IE SLIB- :::-';EA COUR SE
DEPTH t]EF'TH
COLIR."E;E D 0 F.:i-L EG T f IT'A L
D I RECT Z L N :,E .,, ER I TY REC TANG LILAF;~ COORD INA TES
:!. 0 ()
2 00
,:'1. 00
500
'7' 00
8 00
~0
t000
:1. 1 O0
IN 0 R T FI I S iD 1:..I TH' :' -'" E A.: I F / ~ E :2;; T
VERT I CAL
tt,~... ~. .' ..,~ .
'.z, ECT I UN
C). O0 (). O0
1.4:}.': (). 91 S
0..39 2:.41 S
0, 15 :3.66 S
:0.13 6,, .'.""';2 S
C). 40 7.62 S
().., 2:7 ,'.:.:) . .:,'-'"'~/ S
C).2:.7-.: 9. 10 S
O. O0 O. L,O
(),:3,S E -.1.17
";. ', 43 E --3, 2!5
:3.74. E
4.'PO E ''!'
6. I3 E
7.51 I!:-
::'!i:. 70 E
9. ::}.':5 E
.)..z,,r. ............ 11. (bt'_-. E
0 ' :14'P 1 C). 18 ._,':' .1..3.29. E
O. 16 1 O. 45 :!.--.; 14.0:::: E
-17.27
1 J: () 0
1 4-00
16 0 0
:1. 7 00
J. 8 0 0
129'.?. :34- J. 227..1. 4 0
1:399.8:3 1327. 13 0
1C).:!36, S 15.()7: E
11 ' ~' S 15 '-"=
. ,:2, ...I E
12.75
1:3' ..=.,.:3
,1.4-. I:::
- 1 :.:.':. '5.' 9
-19.4.':-.':
'~:' ¢" '- -t 7, T
17'P 9. :-5:1 1727. 11
14. L:.:() S
:i. '.:.;' Q C) 1895,'. 8 C) 1:327..1. 0
2 ('-) C)0 199'?. '79 1 '.? 27. Q 9
:,~: I (..n..) :20'.:~'?, 7:'--: 2C'~27.08
('). 4 :--: S ._,._ ,':"q :'-::9 E/ ().. :Z: 0
0 51 :F; :_:.:3.60 El O. 0 51
0 48 S :'::6. :'_::0 E.:. O. 07
15.71 S
16.91
18.09 S
19.42 E -24.40
20.2':1- E '-'= 6,7
21.07 E -26.94
~2 00 2199.77 '2127. C) 7
2 :E: (.')f) 2 :;-2 '? '?. 77 2227 ,, C) 7
24-(') (") "-:' '---: '-:?'-..-' 7 ds, "" '-"-'-". C)/.,
....... · ....- .' ,, .c:...], ..'L / .....
0 :36, S :31.:'39 E 0.21
2/-, '-' :'::/:, 6(") ' E C). 17
.. -2) ,, ..
C) 4.0 :..--.; :34. 10 i:i.:. (-.~, 2:3
1 'P. I 0 S
1o 8?5 ':'
20.65 '.E;
21.
-': ....
/..:, E -Y:::. 00
':-"-:', 2/. E '-"-'
..... -..'o. 79
:,.-_.:2, :31 El -'.F'.:.-,. 4, 4
25 00 24-'F/9, 75 2427.05
2,5., 00 '259 ,.T,'. 74 2 !-]'2'7.04
:2 :t.. ,:':_,5 S
::.22.77
2:3. :30 E -:2:0.97
· T,.rfi ~ - := .- _
.... (3._, E -:.:: Y. 59
2 '700 2,!, 99.7:3 2627, ():3
:.s: :E: 0 C') 279':T;, 7 2 275:' 7.0.'.2
2900 ::-:: 899.6 '7 :28:26.5;' '7
0 45 S 4- 2. ,1. 9 ' E O, 2:1.
_ .,c,:: S :38 60 !'W c) :L:::3
3 .'.'5 '..3 87. :'-':0 1W 2, :Fi:()
25.
86
6:3
14...
S
S.
S
SF'ERRY-oLI'4 WE[..[. SLIRVEYING COMF:'ANY
FAb: 2
ANCHORAGE' Al...ASKA
COMF"LITAT'ION DA'rE
PRLIDHOE BAY
ALASKA '/''''I':I:'''/':':':''':'::::::':
FEBRUARY 24.~ 1986
DATE OF :3LIRVEY FEBRUARY '.-..'7, 1986
B 0 S S G Y R 0 g; C 0 P I C SI..IR V E Y
JOB NLIMBE,_R AK-BO-6C)OC}9' · ,..
I<ELLY.F'~L.ISHiNG ELEv. =.::7'2!:::70 FT
OPERATOR-r~. HARGER
VERTICAL L:;ECTIOIq CAI_C:LILATE:K~ At...C.~NG CLC~SLIRE
'TIRLIE SUB-SEA L.U ...IR..-..,(: COLIRSE DOG-LEG
TOTAL
MEASURED VERT I CAL MERT I CAL I NCL I NAT I ON D I REC:T'I ON
I]EF']]-I I..EF [H DEPTH DEG' IqIN DEGREEF;~
:,.--.,'EVER I TY
BEG/100
RECTANGULAR
N 0 R T H / S 0 U T H
C:C;OR D INA TE.:=,
EAST / WEST
VERT I CAL
c,E _.] I ON
1.71 '
1.61
0.71
0. F38
1.81
1.49
25.5:.'.:,' S
25, 72 S
z ...... 4-2 .'.:i!;
2,:.].,, 75S
2:3.54 S
21 ,, :3'.:..:' S
1,'=,. 45 E
6,, 74. E
4.9:3 W
17, '.-?:? W
3:3. 19 W
-'."'/' 14
-17.54
-6.97
4. 'PS
19. 13
:3/=,. I1
.... ' 7 ("} (i :3/-, ::', 9' d, 8
· .:) .... .
:38 00 :.7', '7 :.:.i: 6 '"'" '=
· . ..=, ._.1
..: .... 19.71
:3616. 'PS
:::':'71:3 ' ~'
38C}9.4.9
:3904.4 I
::-'r.~'P8.32
4000 '""- -~
· =, ;z / 7.11
4100 4071.02
1.51
1.61
1.22
18.37 S
:1.4.67 S
10.4'7 ::.-'.;
7:1., 42 W
'F,'4,31 W
1 i9.54 W
5 ~::. ,...
, ...,._,S
0,40 N
7,27 N
147.5'::> W
I78.46 W
212.07 W
':'=' 6:S'
77.76,
102.20
'129.48
15' 'Y - . '7 ..., ':'"-
1 'P:;:'. 87
4.20(} 41 ,S:3.78 4091.08
· '1. ::: 0 () 4 .... '=' F; .q .2:2: 41 ,::~:'- '-'. F-;_ :=:_
4-4.00 4:2:45. 16 4-27:2, 46
22 42 I,,! 77. <':, 9 W
24 58 N 77.39 W
26 51 N 77. 19 W
1.57
'::2,26
1. ::2:8
15.07 h.I
2:3.79 N
:3:3.40 N
2::4.:::. 59 14
2:3:::. 05 gl
:3:7.:(). 67 W
'.:/2':'..? . 02
26,8.20
31(:}. 6,1
450(-J 4433.7:4 4:360.64
4o00 451"? 2:3 4446 .=,":'
4700 4.602, 7'3 4530.04
2:9 24 N 7/=,. :..],"F~ W
:2:2 11 N 75.50 1,4
:=:4 31 N 74.80 W
44.1c',..., N
56.62:.'2 N
70.72 N
3'76.56 W
4.-. :,. 22 W
479. :::/-, W
'=' ?,b /
40/_-,. 4._,
4/=, 0.28
490 () 47 d, O. 4-1 46,:37.7 i
500 () '-"-"-' _ _
4 ,:,.:,._,. 0 0 4 7 A 2. :=-: 0
:38 8 N 7:::.8'? W
4C, 5:_:: N 7:3.39 W
42 :37 N 7:3. () W
'2.77
. '7r'~
86.72 N
104.6,4 N
123.89 N
...... :,,'.:':,. 4 0 W
5'.~/7.4.5 W
661.19 W
518.44
· _,,:, 1.05
6,46,. 6,7
4907. 'P'7
4 'P'79.59
504'P. :31
4o..: .... 27
4'P 06,. 89
4976,. d, 1
43 :3'P Bi 7:3. C) W
44 50 N 72. ,'-22:9 W
46 44 N 7'2.50 W
14:=-.:. 88 N
1 d, 4. ::2:4 N
1 ::2:5.66 hi
72,:':,. 5 ::2: W
7';?:3.29 W
861.71 W
714.
Y82
o.J-=,. 62
5400
tz:' f:=' ' ."
...,.D (_1 L)
.5/:,C~0
..... 1 17.0:--:
5 J. L--::3.50
5:24 8.8:=:
5(_')4.4 '-"-'
. -..]' ,:2,
5110. ::.30
517/=,. 18
47
._, .... N 72.:30 W
4L:: 49 N 71.50 W
49 :31 N 71.3'P W
1.20
1. (2)7
0.70
207. :3'..? N
2:.'-.':1.12 N
.=._f .... 19 N
9:_--: :[. :_=:C) W
1002. ,'_:::4 W
1074.58 W
?26.24
1000. 17
1075. (:)8
5700
5; 80
5900
5:3 t .'2:..'2:2
,_ .:, 7c,. A('}
':-i ""':/.
.... 4o :. 57
5240.62
53C) 4. 10
5'366.87
50:,14 N 71.10 W
5C) ..: 56 N 70. L=:0 W
5 17 N 70.8(2 W
O. 76
O. 75
0. :::4
279.77 N'
304.9'.:;' N
:3:.7:0.59 N
1146.'P9 W
1220.02 W
129:3.54 W
E; TAN Ii A R D ~ K F'R 0 Ii. C:O.
~F['i_~i~' BAY
ALA.z, KA
ANL.HLIRA _g:. ALAE;I<A
CCfl'IF'I_ITAT'I ON DATE
DATE OF .::,I_~UEY FEBRLIARY 27
BOEi;S F.;YROSCOF:'IC L:.';LIRVEY
JOB NUMBER AK.BO-6,0009
I.:::ELLY BUSHING ELEV.
OPERATOR-D.. HARGER
-~'IT.~.~L:~-Ii?JIQ-'C.~-~ED AL.ONG CLOL=.:URE
1 '=.786
-i'RUE 5 _iB-b E. f4 COL.IR SE CL-IL.IRSE DOG-LEG
MEA.:,LREB VEI.xTT._.AL '9'E~L'. INC:LIN~I'ON'.. 'DIRECTION.:'. SEVERITY..: RECTANGULAR
DEF'T'H DEF']"H DEPTH ~::: !:-~...DEG.: MZN .i "DEGREEE; i: : DEG/100..' NORTH/SOLITH
~'0(7- ~(%2-5 6, 9 ~? ...... 50
6 ()50 55:35.59 5462.89
6100 5569.76 ?--i497.06,
/..:,ZOO
6:3()0 5706,,:,'" / '~;A:--,'4, 17'
6400 5774.74 5702.04
................ 6'.'=';O'Ci ................ !'.]!; i~4 ]:' :-'2YY~577:7:?~. 50
6, c':, 0 ()
6, 700
6900
7000
' 7'IZ~.J
7200
/~4-00
7500
7600
TO TA L
COORD I NATES ::'. '~. :..'::'!.i:~ VERT I CAL
· . E~E;'F/NE:ST- .... ':' :SEC'ri ON
'?~ N 6,9. i::c) [4 1.4._=; .:,._ 7 04 N
47 16,
46, :=: 1
· 4'7 :20
1 :=:6,6.44 W 1:381.6o
6,177.58 6104.88
..... ~.'47:._~i ' ' 6, i'72- 86
6. :'.~ 1 :=:, 55 6,240, 85
6, :Z-::=: 1.84 6,:=: 0 i.:~. 14.
Iq 6,5.:B0 W 8.77: 2:71.54 N 1401. I6
N /:.,3.60 W 2.89 387.28 N 1434.10
419.6:E: N 1499,08
: .~ ,', ::-:9:: WI r, ~,=, ~c, '-,/.
N :,,:, ,..,, ,.. o 'I ....... ..:, :~ N 1 ~:', 64'..:,:-"=...,
N 6:3 1 '9: W 0 "::'2 '"'=; '
...... · 4,: ..... 36, N 16,29.95
W 1419.2¢:)
W 1455.69
W 16C~ 1" 29
W 1/:.,74.77:
'47
N 6, :=:. 1 '::~.. W c)_. 4'7 51 ,..,,':'/:, ..... 4 N 1/-, 9 F.; . E: 4
N 6:3, 0 W 0.40 552.26. N 176,2.11
N.6,2. E:0 W 0. 16 586,.19 N 1828.41
· . . ,=:. . ,-., ..) . : ,-,,:~ ~
(J.l.J · ~ 6.~f...17 Iq !,:,:4 ......
,7' :' ' ·
· .
::: ::., ~,7-. 6.:,4, 49 tq i i,-":'4'-;o . :,:.,',c..)
ii N:/:,2,19 W'::?:::::. : 0,.,1. /=,88.94 N . .~..
.=; ' .":,r)--,.,-;. 24
N 6, 2. 10 W 0 ,, 0'? 72::..3.20 N 2 ()'..:? O. 09 W
N 61. :::'-) .... W (-) .1 ,_z,
N 6,1.:39 W 0.41
N:6I. 6'.=):: W! 0.66
N:6i.',::q W:]i:: : 0.24
N 6!.19 W 1.01
757../::,:3 N 2154.84 W
'7'72. '7)""
, ]~, ',:'N 221'?. 2'7 W
· ...'- z.,:,-=,. 10
2346.42
2408.99
W '2411 · ?
: : :
W ' .24:2,3,2.,
· -.'._.-4 40
W .-,F, ~ .
7 8 () 0
7'?00
N 6 0.80 W 0. :30 i..72::3. :2:6, hi
N 61.1 ? W O. 5:3 f.;'61. '.:;':2 N
N /:.,1.._'=:'::?. W C).'=c',._, 9'.:;'4 . ,.=r'::..._ N
N 6i. 19 W 0.60 1027.56, N
24 '7 C). :.=:: 6,
· -'1 I~,"
.~._,.:, 1.0:=-.:
'2591. :_::7
2650. '.;>8
W 2/:.,24..51
W 26,93.87
W 276,2.55
t,4 28:]-:0.46
81C)C) A'.753.7:3 6881.04
::::2 0(') ~ .... ,o
.... , ()..-,_, 21 6955. ?]
41- 41
N' 61.19 W
N6t IgW'
C). 4'9
'C). :B3
105i.-?. '? 7 N
I092. 12 N
--727_=) ::: .' :-,-. . _ _
_ _ .. / 7(') ::: C). 5'7
717 E:. '? 1 71 C)6.21
7254 '-'= _
. ,: ..... 7182. 1 F,
' "~".?,0 /. ,.?
7:_=~:q'1 :_=K;,' /~._ ~= ......
74cm-,' 51 -"-"-'~' '--'
. _ . 1 .=, .--,--,.,-, 1
74:36, 04 7413, :B 4
41 0
40 41
4(.') 28
t' ' : .:. '-- ,Z, i
3'F, :' 2/:.,
38 ;: 53
N 6,1. lC.) W C).6'?
N 61.:_=:C) W C).:=:4
N /:.,1. C.) W 0.:=:C)
1124.C) C) N
1155.51 N
i 186.9 C) N
28:26.2:-2:
2 L=:E::3.6 C)
2940.5 :rT=:
W :_=:0:3(.'). :39
W :_::095.76,
W :--: 160.76
N 61. 0 W
N ' ,';,0. E:0 W
lq 6,0.50 W
,:., I0 N
1249. C)6 N
128C.), (':)2 N
~..~ .:,6, 87
:3052' 49
· .:, 107.54-
· _',.:,._ i. 74
SF'ERRY-S.-;LIN WEL~L :E;L.IRVEYING COMF'ANY
A N C I---I 0 R A G E A L A S K A
E;'i"A iq [i (7:1R [i A K F:' R (];I [t. C IZI,
D-."26 C 0 M F:' t...I T A T I i'~1N [i A T E
PAGE
DATE OF SURVEY FEBRUARY 27, 1986
BOSS t3YROSCOF'IC SLIRVI.T.Y
F'RLII'ff-.ItT.~E BAY F'EBRLIARY 24, 19:36
A L A.';SI.:.'.'~
,JOB NLIMBER AK-BO-/.:,C)OC)9
I<EL[.Y BUSHING ELEV. =
OF:-'ERATOR-D. [-lARGER
7~.7t FT
VERTIC:AI.._ SE:CTI(3N CAI_.CLtl....ATEI] AI._ONG CI_OSI._IRE
]-RUE SI_lB-SEA COURSE C(]UF;tSE DOG-I_E3}
TOTAL
IdEA SLIF4ED VE:R ]" I CAL VERT I CAL. I NCL I NAT I ON D I RECT I ON
DEP ]"H DEF']"H DEP ]"1-~ DEG Iff I N DEL. F,I:: E.:,
· :,EVER I TY
DEG/100
RECTANGLILAR
N 0 F;.: T Fl / L:; 0 LIT i..-!
COORD INA TES
EAST/WEF;T
VERT I I]:A I_
,=,EL.] I~JN
)
S'.-?00 7563.95 7491.25
9 () 00 764. 2 ,, 10 7569.4. 0
'?.. 10 ..... ("~ 7 7 i ':).. 6 9 7 6 4/',_. '::)... 9.
9:300 787t. 41 7798.71
'P400 7946. 16 7873.46
38 45 N 60.89
:38 26 N 60. :3()
:3'? 4-.6 N /:-, 0. 1
41 I2 N 58.50
4.:2 1 N :55.5(::,
W 0.2:!.".':
W 0.49
W 1. :34
W ' O. 88
W 2,15
1310.70 N
1:341.:32 N
1:372.62 N
14 o.5.
14 ......... 72 N
]. 47,.'1.. 89 hi
:3162.21 W
:2.:216.57 W
:3'271. :3 :>".: W
33::"'::3 /:,:2 W
34:39, :;:_' 9 W
3414, :37
3476.68
3539, ./.-.,6
36C, 4..,::.,::"~':"'
o7o._ 64
.................... ~? 5 ()0 8 () 20, 18 794. 7, 48
'iP,5,()O 8092. ::.::6 8(':) 19. ,/:,6
'::>.. 700 ,..,':::' 1/-,_.'2 .75:'-' 09. 0 . ("~.. 5
.z.,::, N =" ,/-,':?
...i ,'.:':,. _ .
4.5 /:., N ::;;6.10
· 4,.5 24 N 55.8 ()
1.4 0 ,, 92
W 2.67
W 0. :3'7
1512,:2.:8 N
]L/' £2' ."
· _,._, 0.6, 8 N
15'P0.4!15 N
· -",,::, t ~.. :32
3871.00
:3941,4.:3
hi 56, :30
N ~ ':= 9
N 54.. :30
:2:4 70, 52 W
· '.", '-) C,
._,7o:. .... ,46 t,4
:z~784,7/_-, 14
4011. '? 1
4:081. :.-::7 '
4.149.53
1 () 100 845 (]) l J ::: (:) :~::2.: 77.50 42 20 N 5:::. 19 W
:1. () 2 00 :L-.":!-:;2 4. J. 4 '?' ""
o4..J:/.44 42 18 N 5:2.69 W
J. (') :':li') (') l::l c.:;,:j l:l ': '7 '"' N'";'-' ~ '-' -'
........ ,.~., - . ..I. .~..,.....~ ..
,: ..... ,,'.._. c,/ 41 28 hi .=i? :::'::) W
:L 0 q.~:~O :.36, 7:2.:. 34 ,960 C). 64 41 44 lq 51./_-, 9 W
1·:22 1749.55 N :2.: 839.58 W
() :2.:4 .1. ';"':.;'0 12 N ':'::' ':)':' 32 W
(). "2= .
-,.., ~ 8:3 O. 72 N :3946:2.',:3 N
(). 53 1871.56 1',1 :39':.78. 69 W
421/_-,. 54
42:_--:2.76,
4- 3 48. :.'-.': 4
441.'_::
t 0 50 () 874. '7.72 ::--.:6'75.02 42 , 8 Iq 5 (). 80 W
J. 06 ()0 6::82 .1.. :F:6 :.:.i:749. 1.6 42 1 (:) N 4. 9.60 W
0, 72 191:3. :3'P N .4050. fF.-: 1 W
O. 81 19..:56. 35 N 4 :L c) 2. :37 W
447:,.:.:. / 8
4._44. 1'-'.4
i 0 '700 :L-': :-_-.: 9.5. 'P :3 8:32:2.:. 2:3 42: 15 N 4.8. 10 W
]. (3:3 ()0 89 d, 9. 'P:2.: :3897. 2:2.: 42 16 N 47. :30 W
i (] 9 c)c) 9 (-) 45: ':;'::' 8'i.:;'71 '-"-' 42 16 N 46 ::,' c) W
.......... · .. ~ . .~.~..'2 . · .. ~
......... ' -- ']. 1 CiO0 ............ 5> ]."~ 7';-Y1 ............. '9 0-4:5-[-!21 42 .1../:, FI 4-6, :30 LO
iI070 9169.70 9097.00 42 16, N 46,5:0 W
1.01 :2 (:)(:)(]) Ii 5 (~1 N 4152.96 W
0.54 '204-5.82 N 4202.70 W
O. 67 2091. ::-.':'7 N 42 !51.74 W
O, Od' ........ ~_.': ~ ':-.7:iO-['~?;--'N- ---47~i0]-} ,--!i~i7 W
0.00 2170.89 N 4:2.::7::4.4'.'-2 W
4673.89
47:38.36
4802. d,6
4847.68
~Y~q-T~ ['.~F;F'LACENENT = 4847. /_-,::: FEET AT NORTH 6:2: DEG. 2:3 N iN. WEST AT MD ::--- 1.1070
THE CALC_IL. ATI(]N F'ROCEDI.JRE::-.-; ARE BASED ON 'THE LIL-;E OF THREE DIMENL:;IONAL RA]].IILI:._--..; OF CI_IRVA]'LtRE I'"IETHOEI.
:F_::TAIqDAF;:D Al':.'.'
CO.
:5;PERI";,'Y-SUN WELL SURVEYING COMF'ANY ': :
......
ANCHORAGE AL. AL:;KA
COMPL.ITA'TI(]N DA"I'E
DATE OF SUI:~VEY F:'EBRLIARY 27, l'.:.;'F:6
FEE RL ARY .:::4 1
,JOB NLIMBER AI-::.'-:-BO,/_: 000'.";'
l'-' ? L. EV, =
KEL. L Y BI...::,H I N~, E' -
OPERATOR-B. HARGER
:~ 7 2;/7o · F"r.:,:
]:I'..ITERF'OLATED VALUES F'OR EVEN 1000 F'EET OF MEAFJURED F.~EPT'H
HEASLIRED VERT I C:AL
OEP'TH DEl- ] H
~ E h T :[ C A L
CORREC]" 1' ON
0 0.00 -- 72 ,, 70
1000 'F/'.:./'i:-/. 8,'_'.,'i;;' 27. 16
:,::~-0 .~'9'?,', '79 1927, 09
:.3C~0() 29"?'.~. 42 2'.-.'~26.72
4. 00 () . Si:'ii:' 77. 1 ;l :;ii: ? 04.41
..................... 5000 ..... 4 ~: :-'-~ 5"ZO'('/ ......
6 (') ..... (') I') ..,.!:." '!:-, (.')2, ;:.,_ '? .'=; .... 4 '-'::',_.'.T-' , '.::;' 9.
'7 ...... ('i (')(') 617' 7 , .._,": ,:,"' 61 A.. 4- ,, :38
S 16,/¢5 E ;-:
0.40 hi 178.46 W
i-'..~,;]-';.::ji';.:.~--N .,.:.,_:, 1. 1 ';:' W
357.C, 4 N 1366.44 H
688. ?4 N 2025.24. W
0.00
0. 14 O. 14
0.21 0. Od:,
O. 58 O. 37
22 ::::9 ":"": .....
.... .~..~, ..:: 1
;::L~O-LT~Z-;iEi/,~. 4 6807' 04 · ::'t027;56 N ':': 265(?,'i78 W ' 1 I20 ~.(:, ~;: 7.,::,4
':;'AO 0 .... ;'~ 42'
i 0000.. . ,_,':'"::' 7,'.':,.., ,86 ?:i304 ,z, 7(")':"., .:,"',.::,' N ':""..:, 7,:::,'-"4, 76 W 1 ,"-, 2:g ...... .1. 4 ...:6..., ,2:B
-:'[]7~;:,".;'~.'.it;i ..... :.::;'].-].'7-Z'!~' 1 '.:.'~045.2 ! 21:3:.',:.:. :.'::F; Iq .4300. :'_::7 W 1 :i?,~iii:2.0'? :25',?,. ':.?.~
'1. 10 '70 '? 16'iF,', 70 'i;'O':.'-/7, () 0 '/2 :/'7 (), 8'i;> N 4. :3:34, 4 :;;ir W 1 '? () 0, :3 () 1 :!.:.:, 21
"FFIE'-~/IN-L-iD_IL-.~T];'L-OF4-F:~E-"-EFUR~RE BASEO' ON TFtE USE OF' T'HREE D IMENL:;:[ONAL RAt)IUS OF CURVATLIRE METHO]E!,
· =,PERR ~'-.=,L.N WELl, .=,LIRVEYII'4.., C!OMPANY ' F'AGE /-,
ANCHORAGE A L. A f.:;I-::.' A
:3'TP~i',.IDAF~KI Al< F'F?OI.-.I,,CO,, DATE OF SL.IRVEY FEBRUARY :27, 19:=-.:6
D-. 26 C 0 iff F' LIT A T I 0 IW D A 'f' E
F'RUDHOE B~Y FEBRUARY :,.-::4: 1. '::¢'=' /- JOB I',ILIMBER
.. ,.~ .o ~..J ~
KELLY BUSHING ELEV.
OF'ER(.~TOR-D. FIARGER
= 72, 70 FT. '
I NTE:RF'OL. ATEI:~ VAL. I...IES FOt:~ EVEN I(:)0 FEET OF: L=;LIB-'..,:,;EA KiEF"!'H
Id E A S 1...t R E D
DEPTH
'T'RUE . :!ii;UB-SEA .,. ' TOTAL
VERT IC'AL VERTI .... A[
, .... COORDINATES. : ' MD-TVi]
DEPTH I]EF'I"H IqOR'i"H/SOUI'H EAS'T:/WE:ST D I F:FEREIqCE
(i:' VERT I c:AL:
CORREF:T I ON
C) O. 0.() -'72. '70 C). O0 O. OC) O. OC)
'72 "'/.=..'-:' 7 C) C) . ('). ('). O. 41 S () . :=:.. 9. E C). C) 1
'.' 09:3 '2 C)4 E C) 04
.1. 7:2 172.70 100. () 0 : ~. ......
............... '=' '='
272 "::' 7 '::, 70
·
:2:72 372.7 C) :B () O. (:)0 4.65 S 4 /=,0 E (). 07
4:72 ...........-472?70 ........... ---Zio(.). 0(') 6.13 S 5. '77 E C). C)'..'..>
'7.42 S 7. 13 E 0.10
:=:.17 S 8.44 E C). 12
'" 9(:)S ':.)--:~'=' [=.". F) 1'"
· 9,49 S 10.77 E 0.1:3
'i:?.68 S 1I.'71 E 0.14
1. O. C) 8 :-:~; :I. :3 ,, 11 E- C). 1. 5
,"_:-, 72 672.7 () 6 C) 0. C)0
':'-" 2 ::~ 72 7 F) ::2:00.00
'~:' '72 972. '7 () 90 C). 00
:1. C) 7:2 1 () 7.'7_:[-70 1 0 () 0.0 0
O.
C). (}2
0. (:):2
(-). ("):2
C). 0:2
C). C) 1
O. O1
0,, O1
0,, 01
1 ! 7:2 1 i '7:2. '7<'-~ 1100.00 1 C). 40 S 1:3.8::3 E
:l. 2V'::' .... 1".27'::'. 7(') 12C)C~. ()0 10.6'? :-7 14. -'.~:/... E
- ~.~-.,~, --_ , i,~';~',:- . -~- -- - . ._ #
::[ .:: / Y ~, / ~:. 7 .) 1 ~~]0 11 ' 44 S 1 '=; 67 E
14- '7.::, 1472.7 c) 1400. C)0 1 ~..~'-' ... 1 .'.":.:; 1 z~ .-,,-.,
'-, · ,.~2.'-' E
· J / =: 1 .=~ .... 7 2.7 F) 15 C)C) .0 0 1 ._°,. :3 4 .:,'" 1/", .7 5 E
0. 15
(). 16
O.: 7
O. 00
C). OC)
O. O1
· O. 1 7
C). 18
O. O1
O. O0
16 7._'2 1 o < 72.7 F). 1/=, 00. C)_ O_ 14.0:2 E; 17.34 E
1772 1772.7'0 1700.C, 0 14.62 S 1:::.24 E
O. 18
O. 1 '?
O. O0
O. 0 :L
· :,F ERF, Y-oLti~l WELL
:iii;]-A NDA RI] A K t:'R 0 D.
D- 26
CO.
ANCHORAGE' ALASKA
C 0 M F' U']"A T I [.7.1N D A ']-I:T.
PAGF:, .7 .
DATE OF F;LII:?VF:Y F:EBRUARY 27~ 1'P86
F'EB. RI_IARY 24, .~'~ c.,.-, ,.,, c,,,:,
dOB NLIMBER AI<-BO-60009
KELLY BLISHING ELEV. =
OPERATOR-D. HARGER
72, 7(3 FT.
]:N"f'ERF'Oi....A'I"ED VAI_LIES FOR EVEN 100 FEE'.T OF' SUB-SEA .OEF"r'H
MEASLIRED
D E P T H
TRTJE
I., EF
VERT I CAL
C 0 R R E C T I 01'4
i ::::: 72
15'> 72
L.-tU 72
:21 72
227:2
.2:'3-~,:..' --
2 4 72
25 7::.'
.z. /:, / 2:
2772
2873
O. 2 () (). 01
(). 21 () ,, 01
: : 0"'2;::," : : 'd% ' :'
(). 2.7.: 0. C)0
I:_:i: O. 24 O. 0 :/
E' (). 2,:!.. 0.01
E d.:3q : . 'o'q:3 : '
:307:} :3()72.70 :300(). O0
:31 74 :2,1 72.70 :3 t. (")(:'~ ,, O0
· .::, ..:. / ,:, .':: :.:',/' L..'. 70 :"-': :3 C) 0. ()0
:"74'T7 :3472.70 :3400.0()
1.7'7
14
2 '?
46,
E O. 49 O. 18
E O. 90 O. 41
W 1. ff~ 5 (). 65
W 5.0:2: i 157
:I. 9.0:.3
15.3::3
.06
· 07
W '7. 10 2. ()7
W 9. '79 2'6?
.=,F ERR Y-.':, JN WELL SURVEYI NO · I_.':~ F, 8
:iii; T ~ I',1 [)A R 13 Al< PIR 0 D. 2
i7)-' 26
A N C H 0 R A ('..i E A L. A S K A
COMF'I...rl'AT I C.)N DAT['.=.
DATE OF SI...IF,~VEY F=EBRUARY 27,
986
F:'RUi]HOE BAY
ALASKA
FEBRUARY .24-, 19::36
,...lOB hI.JMBER AI-:::-BO-60005'
KEL:LY BL.=,HING EL. EV - 7'2.7C~ FT.
OPERATOR-D, I.'-tARGER
iI'-.ITE:CF~PEtL. ATED VALLIE:iii; FE. IR EVEN 100 IZEE=.'T 01= .'..'~;L.IB-..F=';EA DEF:'TH
ME'AS[..IRED
DEPTH
TRLIE .=,1.,. B-.=,ER TOTAL
VER'T I CAL VERT t' ..,AL: RECTANGLIL, AR CODRD I NATES
EIEPTH DEF'TH NORT'H/SOUTH EAST/WEST
Mi']-TVD
D I F'F'E REI',,.IC.::E
VERT I CAL'
·
C: 0 R R E C T I 0 N
41 ()1
4 ;.]: ()'?
4:3 19
44-:30 4:37 2. '70
4 ..... 4!'_:5 44-72.70
47;36 4672.7()
49 t ,"'-, /'1. 77:2.70
51 9 () 497:2.70
· ::,.=, ..:, 4 50 72.70
'.E~-t : 'W',':-'i' ., .~-- . . ---
... 4,::,.:,
· ._,ooc .... z, 7."-, 70
.~"i '2' 9 :=: .... =, ?.~. 70
'"--'=' ' -- .5 q7~ c)
....~ ::, ._', .:.-
,':'. 1 () 4 ._,= .._,=' ........ / ...'. 7 C~..
:3772. '70 :37C)0.0(3 11.08 S 115.8:3 W
2:8'72 ,, 7 () :380 () ,, 00 6.1 1 E; ]. 44./2, 2 W
4()72,, 7C~ 4000, O0 7'41 N 21'-'.:. 70 W
4 ;l 72.70 4 i O0.0() 15. t¢ 7 Iq ";252.24 W
4. 27.:2'F7 0 .......... :4:'ff007,"i5~5 ::..i:5..57 1,4
w
4:::..a)(). ()0 :36.5:i!i: N :3'-1.4.5 :[ W
44.00. O0 49.62 N :398.68 W
4.":.. 0 c~. 0 c~ 84, 4 6 t'4 ~.'=, o .,=; -=, W
47()0.0() I07.68 N 607,64 N
4 i~j. O0 1:34.07 N 694.50 W
1:3. 14
J. 7. :2:4
~,:. 6,4
29, ! 0
· -:: z. 97
· .., ".3 ~
4. 6.5
SE:. 29
72:. ';'
90:34
I 13, 92
14:3.55
.1. 7 t-.i:. 6, 2
:3. :36
4,20
6.46
. ,Z, 7
,::)
... C:' 1
11.7:[
14.49
t 8.07
'""'. 07 ·
· 4;, ..D
';.'9, 6:3
4'? 00. () () 162. :32 Iq
!550 00. O0 1 93.1 :L:: N
,'c.';1-'OUTO0 22'7,20 N
520(). O0 2,:5,4.09 N
5] ........ :':: F) (3 .0 (3 :2: O. :2:. ._,._,':'":' N
...... ,(_) O. () 0 :2:8E:./:.E, N
786.73 W
885.41 W
991.14 W
110I. 0:3 W
1215.25 W
1:3:32.39 id
1436. ',::8 H
.,.. . . _!,'.:'.'
2./:, 1.4. 3
':'I 0 ?:9
363, 99
42:0. :::0
4 E:O. 1 ,:.
38.
43,
49,
53,
56.
5 ';-,',
95
85
47
I0
:30
· -., £
5:31.58 51.42
F";F'ERRY-SUN FJEL..L .E;URVF]Y.T. NG COMPANY
STAI'.B.'.IAF~:EI At-,:: i::'RL')L'I.
!] ..-2 ,1,
t::'RLIDHOE BAY
A N i.-.:l--I 0 R A t'} E A L.. A :4 K A
C 0 Id F'LI T A T I ON DA T E
Ih4 It:. OF SURVEY F'EBFd..IAI:;,'Y ::'7,
FEE h. _IAF, Y 24 1 ':.-."8/z,
JOB NUMBER AI<-BO-/_.,()CK}'.-.?
1
I<ELL. Y BIJE;HING ELEV. = 72.70 FT.
....... · .. mm ,'$ ~ ~ '
APE:F;'ATFiR-D HF~RL EK
]:NT'E:f?F'OLATEI] VAL liE::-"; q ' -'t' .......
........ FLR EvEN lOC) FE'.ET AF.- SLIB--E.;r-ZA DEPTH
TRUE
IdE~ E;LJRE'.D VER T I (::AL.
DEPTH DEF:']]-t
..
VEl:;: T I cAI'. ': (;'I~ANGULAR E:OORD l NA TE S TVD VER' -"T' 1; P,.AL
LiEF'TH : NORTH/E;OLITH EAE;T'/WES] ......... '" ri:
DIFI- EREN_.E. CORREC't'I ON
6:249 5,!, 72, 7 () 5,:'._., 00, 00 435. ::39 N
d, :E: '.T; ,:'.::, 5772.70 5700, 00 484.3,1, N
6,!,'5'5 5'5'7:;;!:. 70 5900. O0 N
·
6 ::344 6, () 72, 7 () ,1, 00 (), ()0 : 6 :.35, 39 I',1
I !=, ::: 1 4 c'-, W 5 7 7 0'? 45 F-;'--,
16,27.97 W 624,29 47, I9
:1'""~'=" " '2':~o z.
t 924 1 ()
W 6'72, 73
7.,..~. ' ::': 9
WW '772 06
4:3.4 5
'-l:' f.::A
/ j,." I:-.' ,.%
.61 '7:2 '70 610 C). ('~ A .:. c,,1, 4 :::: lq
6, 2'72 ,, '70 6, 20 (), 00 7:36,, 9 :[ N
6:3'72.7 0 6:3 0 C) ,, C) C.) 787,4. 6 N
2.'-': 020, 5'.">
2116. OC)
2210. '71
W :E:2::C) ~ 1:2
W 8,,_'-, '7 ,, 25
W 91 :.3~ 96
4.8.06
4'7. 12
46.71
'74::.E:i 64-'72.70 6,4,()C~. ()0 E::37.0:3 N
75'74 A.':;; 72_ _ ,70 ,,'.bSOC), 00. ,", ,-, Fi,::,,:, ,. , /.:, -"/ N
7'71. ~'l 6 6'7 2 ,"7 0 6, E;O 0 0 0 ,-$,o,q 4 5. N
2:30 ::]:, 11
2:39:'3 40
24 / '::. 64
W '? !5 E:. 8 6,
W .1. 0 02. 11
W I. Ct 42.54
4 4, 90
43, '"'"--
40 ' 4:3
_ ,::. 7 / .,:. 7 C:, A, ";' 0 ,:":,., 00 9' 7,:/ 81 N
/ 'Z:' .J. '~ _ .- .... , ..
7'::;' '::: (-I ........ ,'_'":, 872 7 (-) 6 E: 0 ('.) 0 (") I 02:4 4._,' ':= N
:iii: J. 25 ,:.::, 9'72, 7,."_') ,':: 900.00 i 06, 8.2 () iq
'7-' 5,':, :.:3., ,1,/:_',
.:(::, .I-.::,. :iii::;-::
2 7:24. '.:.;'c)
3:3. E,O
:f-.':6 ,, E 1
.T-: 5.0'?
c,.,:: ..... ; 7 ()72 70 7 c) 0 (') C) c)
:F-: :':: '.:.:' 1 71 '72.70 '710 C). 00
,-..; ~::- .--., .-~
,::.., ...z 7:272.70 7200.00
1111.15 N
t 1._,~. ,vF'i N
1194.2."iF/ N
W 11'-"
,:, c',. 7'?
W 121'.:;'. 11
1 250.76
'"" ' '--'-' 7 :':: 7'".:' 7 (-) 7:30 0 0 0
'-, ~.-, ...I .]' . - . 4_ ~ , _ ,~ .
::: 7 (3 2 7 4 '7 2. '7 0 74 C)O. 0 0
1. 2:34. ,1,9 N
12'74 ':'""
. / ~:: N
:'_::026. 76 W
:30':> 8, 1 7 !:4
1 2 ::30. 9:3
1310. 16,
30. 16,
"2'F,,, 2:1::
.:,FERRY-..-,JN WELL SURVEYING COMPANY ~ PAGE 10
Ei:T Fi ND~ R D A I< PIROI.'.~ ~
D- 2 ,'.!:,
ANCHORAGE AI_ASKA
COMF'UTATION DATE
PATE OF SURVEY FEBRLIARY 27..
1986
F:'F~LIOHOE BAY
ALASI<A
FEBRUARY 24,, 1986
,_lOB NLIMBER AK'BO-.6C)C)09
KELLY BLISHING ELEV. =
. u'"4- '
EH::'E R A T OR..-.D HAR .. E.R
72 7.- .
. , L:I FT
:[NTERP(]I_ATE:EI VALLIES FOR EVEN 100 FEE:.T OF SUB-L:!;EA DEF'TH
"FRUE E;LIB-SEA TOTAL
MEA SI..IF:?E D VERT I CAL VERT I CAL RECTANGLILAF';/ COORD I IqATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SCHJTH EAST/WEST D I FF:ERENCE
VERT I CAL.
C 0 R R E C T I 0 N
::::91 .l -' ......... ' '7 C) '-'
7.::, / .,::, 75 (')(") 0 (] 1314 12 N ..:, 16:3, ':'/- W 1:338 .=;:'::
....... u ~, ...:--~ ~ .....
'i;;' () :39 7672. '7 () 7 E 0 () (') () '-'.=;"" .......
. 1 .: ..... :,. :::A N 3237.6,6, W 1:36 E, :'::: 7
'::) 1 ,"- '::~ '77'72, '70 "%~]~7~0 '-"'" ' '~'"" .
..................... J...:. :~ 4, ,::,,::, N '-' '":'''~ '::~ '::) _..
...... :,.: ...... 7 W .'1. ::P:F~6, 57
9. 301 7 ::i: 72 ,70 7800 ,00 1 --, * .... ":' '.":/:.. ,:,1'-" N:3:384, ,.,_,.~;':' W 1429 ,02
':7 4 '::":::; 7?.)'72.70 7'.:.;'0C). (.)0 14.,:,c,. 44 N .:,4.J .':.'. 01W 14/-,:3.03
28.3'7
:27 .' 84
30.21
32.45
34.01
:: ..::, 7.~ E: A 7'2 70 F: (] F) (') 00 15 :.3'?. :::/-, N :':.'.q :'::/-, 5/:, W 14 '::;' 9 64
9 714 :E,, 1 '72. '7 () 8100, 00 I 5'76. 1:3 N :3619.9:2 W 1541,47
:. ,: ....... , :::: 272.7 F} ............. ::::2 c) (-). (') () 1 A F; 2 , 16, N :2:7 C). :::_. ::,' .... F.", 1,4 1 ... ,_,._, .q':":' ...... '":'
:36.6,1
41,8:3
4.1,7:_::
o ':~'::~ 4.. .. .. 8:.372 ,70 8:3(]0_ .. ,00 1707, 07 N :3781 , 57 W 1 o.,:.'1 , ,.,=""',::,
I()I::~::C~ '::'47'":' 70 ::::4AA 00 1761'..,_,..,
.....,.., - .... ,:,,:,._,.J. :- ~ W 1657.73
10265 ,_,._c'~72 ..... 7(] .... :q~;C,}. O0 1816, 7o N ":: ':, ' .--' A. ... _, -..:'-'U' I/,1 16,'.:'.4. 7'7
J.C):3'.::~'? 8672.70 E:/-,OC). OA 1871.21 Iq :39'78.24 W 1726.44
0 ..... :,.:, 8'77:2.70 8700.00 1927.6 F,' N 4068. :2::2 W 1 '76, O. '? 8
:L 066E: 8E:72.70 :.E:80C). 00 1986.47 N 41:2:7.2.5 W 1795.9'2
:33.68
:34.54
:2:4.94
1 ():E:O:3 E:972 ........ 70 :::90F}. 0('~ 2047.5:3 N 4204 ,~='='"..., W 1:3:31.04
J. 0'F':38 'F'072.70 9000. O0 2109.95 N 4270.66 W 186,6.20
..... · -' . - '~'-" 42
11070 916'~) 7(:) 'F~097 00 ~170 :::~:~ N 4 .... :,4. W I'F~OC).:3C~
"i"HE CALCI_.ILA]'iF'IN F'ROCEDURES LISE A LINEAR INTERF'OLA'FION BETWEEN
THE NE-AREE;T 20 FL]OT MI] (FRCIM RADILIS OF F':LIRVATLIRE) F'OINT:..z.;
11070
5CRLE :- 1 INCH lO 500,00 / 500.0
PRUDHOE BRT SlgNOgRO RK PROD. CO.
0-26 FEBOURB~ 27, 1986
RK-BO--60009
IRUF
-456o. oD -~,obo. OD -3sbo. OD -3oho. OD -~sbo. OD -~obo. OD -,5bo. OD -,oho. OD -sob. OD
HOB I ZONTRL PROJECT I ON
4[1R1 It
-2000. OO
-1500.00
-tO00. O0
~00.00
O, O0
--500.00
2000.00
4000.00
6000.00
8000,00
10000,00~
5CRLE ;- 1 INCH TO 2000.00 / 2000,0
PRUOHOE 8RY
STRNO~RO RK PRO0. CO,
0 -26
FEBRURR¥ 27, [986
QK-BO-60009
-- 11070
9169. i0
6000. CS
VERT T_ CqL PRCjECT ~ ON
I TELEEEl i Te~eco Oilfieid Se,
6116 Nielson Way
Anchorage, AK
99502
(907) 562-2646
February 6, 1986
s of Alaska Inc.
JOB # 471TAK
SOHIO
WELL: D-26
PRUDHOE BAY
NABORS 18E
Please find attached a copy of the computer calculated MWD directional surveys
for the above mentioned well.
We at Teleco appreciate this opportunity to provide service to Sohio.
Teleco is committed to providing the highest quality of service and we would
welcome any comments or questions concerning these surveys or any of our
other services.
Sincerely,
Pat Havard
Field Service Supervisor
PH/el
Enclosures
A ,~rj~lll~'l' COMPANY
TELECO OILFIELD SERVICES
JOB ~71 SURVEY CALCULATIONS
Date 02/03/86
Page 1
Company: SOHIO
Well: D-26
Location: PRUDHOE BAY
Rig: NABORS 18 E
TELECO Job #
Grid Correction:
Magnetic Declination:
Total Correction:
Proposed Direction:
~71 TAK /
0.00 degrees
31.50 degrees
31.50 degrees
298.20 degrees
RADIUS OF CURVATURE CALCULATION
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg , deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
TIE IN TO VERTICAL
2700.00 0.0 26a.9 S 8~ 5a W 2700.00 0.00 O.OON
,
TELECO MWD
3.a 26a.9 S 8a 5a W 2899.88
a.8 266.0 S 86 O0 W 2993.§a
2 900.00
299a .00
3152.00 6.8 273.0 N 87 O0 W 3150.82
~307.00 8.3 275.1 N 8a 5~ W 330a.a7
~a03.00 10.1 275.8 N 8~ 12 W 3399.23
~.96 0.52S
10.61 1.05S
2a.60 1.19S
a3.19 0.2aN
57.3~ 1.70N
O.OOE 0.00 N 90.O00E 0.000
5.90W 5.93 S 8a.958W 1.700
12.60W 12.65 S 85.219W 1.a92
28.56W 28.58 S 87.607W 1.3a0
a8.87W a8.87 N 89.713W 0.gua
aa.15W 6a.17 N 88.aSOW 1.879
TELECO Job # a71 TAK / 02/03/86 Page 2
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/lO0'
****************************************************************************************************
3a9a.O0 11.2 279.0 N 81 O0 W 3a88.66 73.06 3.86N 80.83W 80.92 N 87.260W 1.372
36~9.O0 13.8 278.6 N 81 2~ W 3639.98 10~.70 9.00N 113.98W 11~.33 N 85.~85W 1.678
3805.O0 15.6 280.~ N 79 36 W 3790.86 1~2.19 15.53N 153.02W 153.80 N 8~.20~W 1.190
3896.00' 17.5 281.1 N 78 5~ W 3878.09 166.92 20.36N 178.~8W 179.6~ N 83.~90W 2.099
aO53.O0 20.0 281.8 N 78 12 W a026.75 215.2a 30.38N 227.9aW 229.96 N 82.aOTW 1.599
a209.OO 22.9 283.2 N 76 a8 W a171.92 270.15 a2.73N 283.63W 286.83 N 81.a33W 1.888
a365.O0 26.2 282.9 N 77 06 W a313.80 332.71 57.36N 3a6.76W 351.a7 N 80.607W 2.117
a520.O0 30.0 28a.6 N 75 2a W aa50.51 a03.39 7a.71N a17.66W a2a.29 N 79.858W 2.505
a675.O0 33.8 285.0 N 75 O0 W a582.O7 a83.O5 95.63N a96.8aW 505.96 N 79.105W 2.a55
a832.O0 39.0 287.1 N 72 5a W a708.aO 57a.10 121.38N 586.3aW 598.77 N 78.30aW 3.aO5
a923.O0 al.3 287.8 N 72 12 W a777.95 631.7a 138.97N 612.31W 657.17 N 77.791W 2.575
5a29.O0 a8.1 288.5 N 71 30 W 5137.aO 981.99 2ag.78N 980.32W 1Oll.6a N 75.706W 1.3a7
5903.00 51.2 289.5 N 70 30 W 5aaa.26 1338.53 367.37N 1321.82W 1371.93 N 7a.a68W 0.673
602a.O0 a8.3 293.1 N 66 5a W 5522.a3 1~30.19 aOO.91N laO7.SaW la63.81 N 7a.105W 3.301
6096.00 16.2 296.7 N 63 18 W 5571.31 la82.96 a23.16N 1a55.79W 1516.Oa N 73.79~W a.688
6587.00 aS.O 298.3 N 61 a2 W 5905.53 18a2.58 589.23N 177a.80W 1870.06 N 71.63aW 0.a37
6895.00 a7.3 297.6 N 62 2a W 6113.01 2070.21 695.92N '~975.88W 209a.85 N 70.597W 0.283
TELECO Job # a71 TAK / 02/03/86 Page 3
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/lO0'
****************************************************************************************************
7a01.00 a5.9 301.1 N 58 5a W 6a60.67 2a37.72 876.09N 2296.28W 2a57.73 N 69.117W 0.57a
771a.00 a3.9 299.0 N 61 00 W 6682.37 2658.52 986.71N 2a87.50W 2676.05 N 68.363W 0.795
8210.00 al.a 299.7 N 60 18 W 70a7.15 299a.a7 1151.a1N 2780.39W 3009.37 N 67.505W 0.513
8713.00 39.1 299.7 N 60 18 W 7a31.03 3319.3a 1~12.58N 3062.59W 3332.02 N 66.801W 0.a57
89a0.00 38.3 300.1 N 59 5a W 7608.19 3a61.20 1383.33N 3185.63W 3a73.02 N 66.528W 0.369
9215.00 aO.a 301.1 N 58 5a~W 7820.83 3635.a0 1a72.09N 3335.70W 36a6.09 N 66.188W 0.798
9a7a.OO ~1.8 302.9 N 57 Ob W 8016.00 3805.28 1562.30N 3a80.O8W 381a.68 N 65.823W 0.708
~ 738.00 aS.a 305.0 N 55 O0 W 8207.15 3986.38 1663.96N 3631.07W 399a.17 N 65.380W 1.~70
9926.00 a3.6 305.a N 5a 36 W 83al.23 a117.16 1739.91N 3738.7aW a123.77 N 65.0aaW 0.969
10087.00 42.5 .306.a N 53 36 W 8~58.89 a226.O7 180a.35N 3827.77W a231.72 N 6~.762W 0.80a
TELECO 0 i 1F i ~ 1 d S~rv i c~s
PLAN VIEW
WEST (~t)
4800 4000 3200 2400 1600 800 0
6400
5600
4800
4000
H-
Q~
2400z
1600
800
800
TEL~-CO O~ ] ~ ~ al d Sarvi cas
VERT I CAL PRO~ECT I ON
0
2000
3000
4000
5000
6000
W
7000
BO00
gO00
10000
1 1000
1000 2000 :3000 4000 5000 6000
VERTICAL SECTION (~t)
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAG E, ALASKA 99502-0612
February 25, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our proposal to perforate the well.
PFB:JAM'~
Yours very truly,
P. F. Barth
Supervisor, Reservoir/
Production Surveillance Unit I
Enclosures (3)
cc: Drilling Well Files (MB12-1)
Well Records (LR2-1)
D-26 Well File
RECEIVED
FEB ~ 7 :Lq86
011 & GL~ Cons. r.~lmml~len
A~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL~] COMPLETED WELL[] OTHER
7. Permit No.
86-18
2. Name of Operator
SOHIO ALASKA PETROLEUM COMPANY
3. Address 8. APl Number
P. O. BOX 196612, ANCHORAGE, ALASKA 99559-6612 50-029-21530
4. Location of Well
At surface:
1715' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM
I6. Lease Designation and Serial No.
ADL 28284
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 72.70' AMSL
9. Unit or Lease Name
Prudhoe Bay Unit
12.
10. Well Number
D-26 (44-15-11-13) PBU
11. Field and Pool
Prudhoe~Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [~] Altering Casing
Stimulate [] Abandon [] Stimulation ~_] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note' Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170). .
The following interval will be perforated in February 1986 using Gearhart's 4" carrier
gun at 4 spf.
10730' - 10750' BKB (Ref. BHCS/GR, 2/6/86)
Following perforation, this interval will be straddle-packed and the well suspended
pending further perforating operations.
NOTE:
Verbal approval of thiS job was given to Peter Barth, Sohio, on Friday,
February 7, 1986 by Blair Wondzell, AOGCC. d~
RECEIVED
FEB 2 7 ]986
Al~ka Oil & Gas C,ms. Commissio~
Anchorage
14. t hereby certify that the foregoing is true and~rrect to the best of my knowledge.
Signed ,', Title Supvr. Reservoir/Production
The space below for Commission use P. F. Barth Surveillance I
Conditions of Approval, if any'
A?prov,~d Cop3¢
Form ]0-403
By Order of
COMMISSIONER the Commission
Submit "Intentions" ,n Triplicate
___, ,,c-.., ............ c~ ....... ";..
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561~5111
P.Q. BOX 6612
ANCHORAGE, ALASKA 99502-0612
February 25, 1986
Alaska Oil & Gas Conservation commission
3001 PorCupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
· . ·
Well D-26 (44-15-11-13) PBU
Gentlemen:
Enclosed~ in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the'above-named well. This contains our subsequent
report of perforating this well.
PFB:JAM~
Yours very truly,
Po F. Barth
Supervisor, Reservoir/Production
Surveillance I
Enclosures (2)
cc: Drilling Well Files(MB12-1)
Well RecOrds (LR2-1)
D-26 Well File
RECEIVED
FEB ,2 7 ]986
Alaska Oil & 6as P,~os. Commission
Anchora.qe
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL[]
COMPLETED WELL []
OTHER
2. Name of Operator
SOHIO ALASKA PETROLEUM COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of Well
At surface:
1715' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM
6. Lease Designation and Serial No.
ADL 28284
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 72.70' AMSL
7. Permit No.
86-18
8. APl Number
50-029--21530
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
D-26 (44-15-11-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170). .
The following interval was perforated February 10, 1986, using Gearhart's 4" carrier
guns at 4 spf:
10730' - 10750' BKB (Ref. BHCS/GR, 2/6/86)
This is a suspended well straddle-pack completion.
1.4. I hereby certify that the foregoing is true an/¢ correct to the best of my knowledge.
Signed
RECEIVED
FEB27 1986
'q ~ , .. buitliii:.';$JOI1
The space below for Commission use
Conditions of Approval, if any'
P. F. Barth
Title Supvr. Reservoir/Production Date
Surveillance I .............
Approved hy COMMISSIONER
By Order of
the Commission Date
Form 10-403 Submi! "lnlentions" ~r~ Triplu:a!e
SOHIO ALASKA PETROLEUM COMPANY
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MARATHON
In:
MOBIL
PHILLIPS
sTATE'" OFi~"~SKA'--' ]:
BPAE (Transmittal Only)
GEOSCIENCES
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 2-14-86
T#:
76879
REFERENCE:
TELECO MAGNETIC DIRECTIONAL SURVEY (S)
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
-'- B-29
--- C-29
~ D-26
~ L2-25
·
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
MWD Directional Survey
1-23-86 Job # 468 TAK Teleco
2-07-86 Job # 469 TAK Teleco
2-03-86 Job # 471TAK Teleco
2-06-86 Job # 467 TAK Teleco
RECEIVED
DATE
Cathy Perkins LR 2-1
INFORMATION CONTROL
Wells Records LP, 2-1
TEC~ICAL DOC~ENTATION
January 10, 1986
Mr. R. S. Allan
District Drilling Engineer
Sohio Alaska Petroleum Company
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re:
Prudhoe Bay Unit D-26
Sohio Alaska Petroleum Company
Permit No. 86-18
Sur. Loc.. 1715'SNL, 1692'WEL, Sec. 23, TllN, R13E, UPM.
Btmhole Loc. 570'NSL, 474'WEL, Sec. 15, TllN, R13E, UPM.
Dear Mr. Allan:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indennlify you from the probable need
to obtain additional permits required by law from other
governmental agencies prior to commencing operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. ~.Paere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
V~ tr~Lv~vQnrs.
C. V. Cha~teft6n
Chairman of
Alaska Oil and Gas Conservation Commission
BY ORDER OF THE CO~-~iISSION
dlf
Enclosure
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug L. Lowery
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
January 7, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' Mr, C V, Chatterton
Well D-26 (44-15-11-13) PBU
Gentlemen'
Enclosed are the following documents in triplicate along with our check
for $100.00 to cover the permit filing fee.
·
2.
3.
4.
5.
Application for Permit to Drill
Proposed Drilling Program Outline
Proposed Blowout Prevention Diagram
Surveyor's Plat showing Well Location
Directional Map
If you have any questions, please call Ted Stagg at 564-5173.
Yours very truly,
SOHIO ALASKA PETROLEUN COMPANY
RSA/HAW/dg/O144D
R. S. Allan
Division Drilling Engineer
Enclosures
cc' A. C. Clark D. A. Walters
Well Records - V. Aldridge
Well File #17
RECEIVED
JAN 0 8 t986
Alaska 0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA,--,- AND GAS CONSERVATION CC ,MISSION JAN 0 8 1986
Pl=RMIT TO DRILL
20 AAC 25.005 Alaska 0il & Gas Cons. Commission
la. Type of work.
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL ~
DEVELOPMENT GAS []
SERVICE [] STR~~lC []
SINGLE ZONE ~]
MULTIPLE ZONE []
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1715' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM
At top of proposed producing interval
450' NSL, 450' WEL, Sec. 15, TllN, R13E, UPM
t
570' , 474' WEL, Sec. 15, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF etc.)
60' KBE
6. Lease designation and serial no.
ADL 28284
9. Unit or lease name
Prudhoe Bay Unit
10. Well number
D-26 (44-15-11-13)
11. Field and pool
Prudhoe Bay
Prudhoe Oil Pool
12. Bond information (see 20 AAC 25.025)
Type Blanket Surety and/or number Safeco :Ins. 2975387
Amount 200,000
13. Distance and direction from nearest town
NW of Deadhorse lO miles
16. Proposed depth (MD & TVD)
14. Distance to nearest property or lease line
ADL 28285 450 feet
10921'MD & 9176' TVD BKBeet~
19. If deviated (see 20 AAC 25.050) 4i ""
KICK OFF POINT 2800 feet.
17. Number of acres in lease
2560
20. Anticipated pressures
MAXIMUM HOLE ANGLE o I (see 20 AAC 25.035 (c) (2)
15. Distance to nearest drilling or completed
well H-4; 1600 feet
18. Approximate spud date
Ja_nuary 13, 1986
~UU psig@__~ Surface
4390 ps,g@._8800 ft. TD (TVD)
Proposed Casing, Liner and Cementing Program
SIZE
'Hole Casing
!6" /20x3-0''
7½" 113-3/8" 72#
2~" / 9-5/8'' 47#
'8~" /7" 29#
22. Describe proposed program:
Weight
Insulat,
CASING AND LINER
Grade CouplingJ Length
~d CondUctor I 80'
k-80 lButt.
L-80 /Butt. I0036'
L-80 |Butt.~Jll05'
SETTING DEPTH
MD TOP
Surfacel
SurfaceI
SurfaceI,
TVD
9816' I~ 8345'
MD BOTTOM TVD
110' ~ 110'
2680' 26~0'
0066' ~1 8533'
I
'10921 ' 9176'
QUANTITY OF CEMENT
(include stage data)
8 cu. yds. concrete
3720 cu. ft. Permafros
1880 cu. ft Class G +
230 cu. ft. Class G
330 cu. ft. Class G W
See attached Proposed Drilling and Completion Program.
23. I hereby certify that the foregoing is true and correct to the best of my knowledge
SIGNED ~)_ S - ~ TITLE Division Drilling Engine6EfATE
The space below for Commission use
CONDITIONS OF APPROVAL
Samples required Mud log required I Directional Survey required I APl number
1 [
Permit number Approval date
8~ f SEE COVER LETTER FOR OTHER REQUIREMENTS
APPROVEDB~_~4~d~ ,COMMISSIONER DATE ~T~qfl,,O__T'~ l_0, 1,86
~.~%/--~/~ by order of the Commission
Form 10-401 ~'~ Submit in triplicate
$:~, -7_1 _~
8~el
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL D-26 (44-15-11-13) PBU
Revision 1 (BHL Change 10/25/85)
Install and cement 80' of 20" x 30" insulated conductor to surface.
Drill 17-1/2" hole to 2700' MD and cement 12-3/8" 72# L-80 Buttress
casing to surface,
Install blowout prevention equipment consisting of 5000 psi W~P~
pipe rams, blind rams, and annular preventer. Maximum possible
bottomhole pressure is 4390 psi at 8800' TVDss based on original
reservoir pressure. Maximum possible surface pressure is 3300 psi
based on a gas column to surface from 8600' TVDss and an oil column
to 8800' TVDss~
Directionally drill 12-1/4" 'hole to the 9-5/8" casing point above
the Sadlerochit Sandstone~ Run 9-5/8" 47# L-80 Buttress casing to
within 5' of 12-1/4" TD and cement in two stages: First stage using
Class G cement around the 9-5/8" shoe~ The second stage to be
downsqueezed in the 13-3/8" x 9-5/8" annulus followed by nonfreezing
fluid~
Directionally drill 8-1/2" hole to TD~ Run 7" liner from TD to 250'
inside 9-5/8" casing shoe and cement using Class G cement with 5%
KCL~
Clean out t° 7" float equipmentJ. Change over to 9~6 ppg. NaCl
completion fluid~ TeSt casing and lap to 3000 psi"
Run 9-5/8" production packer on internal plastic coated tubing with
gas lift mandrels and a sliding sleeve. Set packer above top of
liner. A subsurface safety valve with dual control lines will be
placed 50' below base of permafrost. Install and test Xmas tree.
Displace tubing to diesel. Set.and test packer.
Suspend well for perforating subsequent to rig release.
Tubing Size-
Tailpipe Size' 5-1/2", 17#, L-80, BTC.
.
111185/DAW/d§/O632N
5-1/2", 17#, L-80, A/B MOD. BTC., IPC w/7 GLM's
RECEIVED
JAN 0 8 1986
Naska Oil & Gas Cons. Commissiorl
.... Anchorage
20" x 30" InsUlated Conductor
Ball Valve
13-3/8" Casing Shoe
17-1/2" Open Hole
9-5/8" Packer
7" Tieback Assembly
PROPOSED ~OLE D rAGRA~i
V~EI_L D-26 (44-15-11-13) Revision 1
PROPOSED DEPTH
BKB
2050'
2680'
2700'
9596'
9816'
AC~IIJAL DEPTH
BKB
9-5/8" Casing Shoe
12-1/4" Hole
1 0066'
10071 '
7" PBTD
7" Liner Shoe
8-1/2" Open Hole
1 0881 '
10921 '
1 0921 '
B.O.P. ~-'3 TA C K
CONFIGUR.,~TION
ii i
I :5 5/8"
TRIPLE
RAM STACK
5000 PSI WP
ii i
DRILLING
ANNULAR
PREVENTER
PIPE RAMS
BLIND RAMS
{.12>
C)
CHECK
KILL UNE
HAND
GATE
GATE
DRILLING
SPOOL
4" CHOKE LINE
HAND
GATE
HYDR. Ass'r.
GATE
PIPE RAMS
40 I0 20 30 .... 40 I0 ZO $0 40
D- 28(ProPosed)(~
05
........ bSO' D-17(Proposed)
(Proposed) (~L
l-
of I -o
I
D-ZO
( Proposed
2100'
~ I00'
(Pro.o~
2900'
PAD DETAIL
SCALE I"= 300'
PORTION OF T II N, R 13 E,UM
SCALE I": I/2 MILE
,
CERTIFICATE OF SURVEYOR
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska end that this plat
represents a location survey of the wellpad shown and the wells
thereon. This survey was mede by me or under my supervision
end all dimensions (]nd other details are correct. Bottom hole
Iocotions are furnished by others. ('~ .
Date burveyor
NOTE: Alt bottom holes ore 8800'sub see.
REVISED D-26 BHL
REVISED D-27 LOCATIONS
ADDED PROPOSED D-26 BHL
ADDED PROPOSED D-;'7 8 D-28 BHL
ADDED PROPOSED D-2:3 BHL
ADDED PROPOSED D-Z2 BHL
ADDED PROPOSED D-20 8, D-;'I BHL
ADDED PROPOSED D-19 BHL
ADDED PROPOSED D-18 BHL
ADDED PROPOSED D-17 BHL
RECEIVED ·
""'- - 11/15/85
'-~ I0/IT/8,5
JAN 0 8 1986 ~._,o/,~/~
4/2/82
3 / 30/82
'Alaska Oil & Gas Cons. C0mmissiml :~/~9/8;'
~/4/8;,
Anohomge ,2/,o/8,
12 / 8/81
PLAT 3 of 3
PAD "D" EXTENSION
Located in
E I/2 PROTRACTED SEC. 23,TI IN, R 13E, UMIAT MERIDIAN, AK.
Surveyed for
SOHIO ALASKA PETROLEUM CO.
Surveyed by
OCEAN TECHNOLOGY, LTD.
5333 FAIRBANKS ST., SUITE II
ANCHORAGE, ALASKA 99518
~$DUA12~[DRANSR¢,TESTIG. RUN]D26_CLOSAP_SHORT7, LIS;1
--- Closest Approach Analusis ---
Date: 12-D£C-85 Time: 14:43:13
Search Radius= 2~91 7 DEGREE LEAD LINE
For proposed well: D-2& [44-15-11-13]
Location = W-E S-N TVD(SBS)
Top 653463.00 5959273.00 -60.00 ..-
Bottom 64~933.9~ 5960927. 17 9~00.31
....
Note: All depths ~n feet Bolo~ Kellg Bushing (BKB)
12-DEC-1985 14:44
Page I
WELL IDENT
Closest Approach' '.,.,
/PROPOSED\' -' /NEARBY\ CLOSEST
]'VD DEPART_ . ::~..'~D ...i DEPART
A029-2005400
D-1
A029-2005600
D-4
A029-2005700
D-3
A029-2005800
D-D
A029-2010400
H-4
A0~9-~014800
D-6
A029-2016200
D-7
A029-~024200
H-7
A029-~037200
D-8
A0~9-~038100
D-9
A029-~038900
D-lO
A029-~043500
D-I!
A0~9-~044300
D-I~
A029-2044900
D-13
D-14
A0~9-~046100
D-15
A029-2068300
D-16
A029-2069200
D-17
A029-~069400
D-18
A0~9-2070700
D-19
A029-~073700
D-~
A0~9--2073800
10::>. 5
2.2
3489. 2
2800.0
9160. 3
3583. 9
3677. 0
*~6o. a.
88. 5
2687. 7
0.0
6976. 5
0.0
88. 4
2999. 7
3677. 0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10~. 1
0.0
48~1.7
174.5
48,~. 1.7
-0.0
0.0
0.0
0.0
174. 5
0.0
0.0
0.0
0.0
0.0
0.0
._
Vertical IntersectiDn
/PROPOSED\ /NEARBY%
TVD DEPART TVD DEPART
O. 5 749.9
_
O. 0 630. 8,:
362. I ' 518.3
21.9 616. 4
6110. 9 % 1:636~'9
185. 6 899.3
303. 4 827. 6
, ..
.~,.~., 1.~,~:~..~:~,':___.. .-
O.
0
10. 7.,. .. 1:659. 3
..: .. ,.~.., - ..=-,..~.:? ---?. ?., . . ,.,.~ .-,
.:.....~:. ;.: -. :
O. 0 1367. 0
33.3 ' 1167.9"
442.9 1~9. 0
O. I v"~
o. I 27~.2
O. 3 la~.
100.0
0,0
36,~3. 0
2801.7
9~1.7
.
3873. 1
3989. 1
. .
91~K~. 7
.
100. 0
2699, 9
.~'
10. 1
7~9~. ~
B.O
1'~. 0
3096. 6
40~. 0
~7~ z
17. 1
14. 1
18. 3
D-23 2576. 7
A029-2078000
D-20 O. 0
_$155UA12: [DRANSRC. TESTIG. RUN]D26_CLO~AP_~HORTT. LIS; 1
0.0 8.4' 0.0 55. t
1='-DEC-1985 14:44
A029-2078800
D-21 388.5 0.0 400.0
A029-2086200
H-17 9160.3 4821.7 9317.3
A029-2088300
H-19 9160.3 4821.7 9051.5
SUMMARY
The ~ell which comes closest to the proposed ~e11 is:
A029-2078800 D-21
ClOsest approach distance - 50.6 feet
~,CK OFF for this run - 2800.0 ~eet
RECEIVED
VERTICAL
DISTAddCE
Page
!z£0
600
ITEM APPROVE.- DATE
(2 thru 8)
//xh4
'(8)/ /
(3) 'Aamin /J¢.o/< l-F- ~6;
ru(10 and~~
(4) Casg /z/,T'/./ ~/g/S~
(13 thru 21Y' '
, / / f
(5) BOPE ~'~.y-~.
(22 thru' 2B)
Geology:
WVA
JAL
Engineering:
Lcs
t~-M~- . HJH
rev: 03/13/85
6.011
Lea~
& Well No.
YES
Is the permit fee attached ' ~0~
~eeeeeeee®eeeeeeeeeeeeeeeeeeeeeoe eeeeeeee
NO
2. Is w~!l to be !ocat~d ].n a defined pool ,,.,,,..,,,..,,,,,,,,.,, .... ,~zdf
3. Is well located proper distance from property line ........... ~
4. Is well located proper distance from other wells ..iii.ill..l .....
5. Is 'sufficient undedicated acreage available in this pool ............ ~
6. Is well to be deviated and is wellbore plat included ................ ./~ --
7 Is operator the only affected party - ~/w~
· eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
8. Can permit be approved before'ten-day wait ........ .................. ~
9. Does operator have a bond in force .................................. ~f
10. Is a conservation order needed ...................................... ., ~
11. Is administrative approval needed ................................... ~
12. Is the lease number appropriate ..................................... __
13.
14.
15.
16.
17.
18.
1.9.
20.
21.
22.
23.
24.
25.
26.
REMARKS
27.
Is conductor string provided ........................................ ~
Is enough cement used to circulate on conductor and surface ........
Will cement tie in surface and intermediate or production strings . ~
Will cement cover all known produCtive horizons ..................... ~z%~/
Will surface casing protect fresh water zones ....................... //~
Will all casing give adequate safety in collapse, tension and burst.. ~
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate'wellbore separation proposed ............................ ~
Is a diverter system required .......................................
Are necessary diagrams of diverter and BOP equipment attached ....... ~
Does BOPE have sufficient pressure rating - Test to _~frD-~ psig .. ~y~
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
Is the presence of H2S gas probable .................................
Additional requirements .......................... ................... >:..~" '"
.
,,.
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
O
·
HO