Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout186-084PLUGGib~G & LOC_%TION CL~A~,NC~ REPORT
State cf Alaska
Review the well fi!e, a.~.-cmmme:: o=. plu.~:ji~q, well head
C~n¢£usions:
~/5F7- O0
g
STATE OF ALASKA
ALASK/& OIL AND GAS CONSERVATION COrv~,,,~SSlON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 186-084 301-019
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21587-00
4. Location of well at surface 9. Unit or Lease Name
1440' SNL, 347' WEE, SEC. 33, Tll N, R13E, UM ",~ .ii..::~'~'~,~i;~.~..¢~,~ Prudhoe Bay Unit
At top of productive interval
1903' SNL, 1087' WEL, SEC. 05, T10N, R13E, UM
At total depth,.~ ~?,~~ 10. Well Number
Y-20
2731' SNL, 1950' WEL, SEC. 05, T10N, R13E, UM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation an~~: ' 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 89.03' ADL 028289
12. Date Spudded 04/28/1986 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'05/25/1986 ~27/2001 115' water depth' if °fish°re N/A MSL 116' N°' °f C°mpleti°ns Zero
17. Total Depth (MD+TVD) ~ 18. Plug Back Depth (MD+~D) ~19. Directional Sudsy ~ 20. Depth where SSSV setl 21. Thickness of Permafrost
13866 9012 FTI 13866 9012 FTI B Yes ~ NoI N/A MaI 1900' (Approx.)
22. Type Electric or Other Logs Run
Teleco MWD Gamma
23. CASING, LINER AND CEMENTING RECORD
CASING SE~ING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOSOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" Insulated Conductor Sudace 110' 8 cu yds Concrete
13-3/8" 72¢ L-80 40' 3095' 17-1/2" 4389 cuff Permafrost
9-5/8" 47¢ L-80 38' 12646' 12-1/4" 920 cu~ Class 'G'
4-1/2" 13.6¢ AFL4S 12430' 13866' 8-1/2" Uncemented Slo~ed Liner
24. Pedorations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and inte~al, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6¢, L-80 11686' - 12430' 12430'
MD ~D MD ~D
26. ACID, F~CTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11593' Set EZSV
~?~/~.f' -~ ~;; 4 U,J ~ 11570' Top of Whipstock
114574' Set CIBP
&~.~qh0r¢,~r¢ 11449' Top of Whipstock
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas li~, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR O~L-B8L GAS-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO
TEgT PERIOD
I
Flow Tubing Casing Pressure CALCU~TED O~L-BBL GAS-MCF WATER-BBL O~L GRAWTY-API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosi~, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
~ .
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Sag River 12210' 8893'
Shublik A 12320' 8922'
Sadlerochit / Zone 4 12670' 8985'
31. List of Attachments: Summary of Daily Drilling Reports
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble ,,~,,~~ ~ Title TechnicalAssistant Date
Y-20 186-084 301-019
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No./Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Original Well: Y-20
Field: Prudhoe Bay Field
APl: 50-029-21587-00
Perm it: 186-084
Sidetrack Well: Y-20A
Field: Prudhoe Bay Field
APl: 50-029-21587-00
Permit: 201-025
PRE-RIG WORK FOR SIDETRACKING OPERATION
01/21/01
MITIA failed. CMIT, T x IA to 2500 psi passed.
01/23/01
Cleared paraffin w/3.71" gauge ring at 2263' sim. Tagged obstruction at 11660' sim with gauge ring.
01/26/01
MIT - Tubing passed. Tubing is fluid packed, IA FL at 150'. Pressured tubing to 3000 psi. In first 15
minutes tubing lost 40 psi. In second 15 minutes tubing lost another 40 psi for a total of 80 psi.
Monitored another 15 minutes, lost 30 psi. Fill up volume after 50 minutes. Test was 20 gallons. Leak
rate = 0.4 gpm. Bled tubing back to 1240 psi. Final WHP = 1240 / 750 / 20.
01/29/01
MIT- Tubing passed. Tubing FL was at surface. IA FL at 125'. Pressured tubing to 3000 psi. Tubing
MIT lost 20 psi in the first 15 minutes, 20 psi in the second 15 minutes, 5 psi in the third 15 minutes and
5 psi in the forth 15 minutes. For a total of 40 psi in 30 minutes and 50 psi in 60 minutes. IA pressure
remained constant during MITT. Fill up volume was 18 gallons and total leak time was 73 minutes.
02/16/01
Punched holes in tubing from 11613' to 11617' and cut tubing at 11637'. Left well shut in.
02/19/01
MIRU. RIH to 4000'. Circulate hot water down coil taking returns up backside to system. Establish
circulation, 2 bpm at 2300 psig down IA, taking returns up production tubing. POH, RD.
Drift tubing to 11600' sim w/3.65" Cent and SB. No problems. Rig up Triplex. Pressure up on tubing to
1780 psi. IA rose to 1320 psi. RDMO.
~: .' :: ~' : ~ : -i::~BP~ExpLORATION Page 2 of 10
Legal Well Name: Y-20
Common Well Name: Y-20A Spud Date: 2/20/2001
Event Name: REENTER & COMPLETE Start: 2/20/2001 End: 3/30/2001
Contractor Name: NABORS Rig Release: 3/30/2001 Group: RIG
Rig Name: NABORS 7ES Rig Number: N7ES
~Date:.-~;;;:~ ~.From:;To~ ;~HoUm ~ Task: O~e: :.Phase-~ ~::: :~ :. : .... Description of Operations
2/20/2001 00:00 - 01:00 1.00 MOB PRE PJSM w/Peak. Secure ~llar.
01:00 - 05:30 4.50 MOB PRE Move rig off P-20B. Remove snow from side of road. Moved rig to mile
2 of P pad road. Rear wheel off road.
05:30 - 09:00 3.50 MOB PRE Assessed incident potential. Foxed plan, no pipelines or power lines in
area. Stabilized rig with D-8 ~ts. Backed rig into ~nter of road.
09:00 - 10:00 1.00 MOB PRE PJSM. Moved rig to pipeline road.
10:00 - 11:00 1.00 MOB ~PRE Incident review. Nabors reviewof howwheel steered off road.
Stressed no margin for error on pipeline road, CC-2 areas.
11:00 - 18:00 7.00 MOB PRE Continued rig move to Spine Road, CC-2 road, and on to Y pad.
18:00 - 00:00 6.00 MOB PRE ~U on Y pad and raise derrick while wait on wellhouse removal and
pad prep. Moved p~s, ~mp and shop from P pad to Y pad. ~U top
ddve, rig floor, ~le chute.
~21/2001 00:00 - 06:00 6.00 RIGU PRE Set ma~s over well. PJSM. Spot sub base over well. Spot mud pits,
shop and ~mp. Set cu~ings tank. Rig a~pted 0600 hfs 212112001.
06:00 - 08:30 2.50 RIGU PRE Be~ cu~ings tank. Secure ~llar doors. Hook up pits. Take on
seawater.
08:30 - 09:00 0.50 RIGU PRE Held pre-spud safe~ and environmental meeting.
09:00 - 10:30 1.50 RIGU PRE Installed seconda~ annular valve on tree. ~U lines to circulate.
10:30- 11:30 1.00 RIGU PRE ~U lubri~tor and pulled BPV.
11:30 - 12:30 1.00 RIGU PRE Finished ~U lines to circulate diesel to outside cu~ings tank.
12:30 - 20:30 8.00: RIGU PRE Circulate diesel freeze prote~ from well. Circulate B/U with seawater to
~its. 3 BPM, 450 psi. ~D Lines.
20:30 - 21:00 0.501 RIGU PRE Installed ~C and tested from below to 750 psi.
21:00 - 22:30 1.50 RIGU PRE N/D adapter flange and tree. Veri~ hanger threads, ok. Te~inate
~ntrol lines.
22:30 - 00:00 1.50 RIGU PRE N/U BOP's.
N2N2001 00:00 - 01:30 1.50 RIGU PRE N/U BOP.
01:30 - 07:30 6.00 RIGU PRE Test BOP's. Tested pipe rams, blind rams, hydril, choke and kill line
valves, floor safe~ valves, and choke manifold to 250~3500 psi. (Could
not test lower pipe rams, XO in way). Fun~ion tested a~umulator.
Witness of test waived by John Crisp, AOGCC. UD tools, cleared floor.
07:30 - 08:30 1.00 RIGU PRE ~U lubri~tor and pulled ~C.
08:30 - 10:00 1.50 PULL DEOOMP M/U landing jt and screw into hanger. BOLDS. Pulled hanger to rig
floor, ~me free at 185K. PU ~ = 155K.
10:00 - 11:00 1.00 PULL DECOMP ~U tongs and HES spooling un~.
11:00 - 23:00 12.00 PULL DEGOMP UD landing jt and tubing hanger. Pull ~mpletion tubing, spooling
balan~ and ~ntrol line. Re~vered 47 clamps and 2 SS bands.
Cont'd ~D 4-1/2" tubing. Re~vered 286 its 4-1/2" BTR tubing + 26.58'
cut jt.
23:00 - 00:00 1.00 PULL DECOMP UD tubing tongs and clean rig floor.
2/23/2001 00:00 - 01:00 1.00' PULL DEGOMP Clear rig floor.
01:00 - 02:00 1.00 BOPSUR DEOOMP Tested lower pipe rams to 250~3500 psi.
02:00 - 03:00 1.00 BOPSUR DECOMP Installed wear bushing.
03:00 - 06:00 3.00 PULL DECOMP M/U fishing B~ ~1. Oversho~ grappel for 4-1/2" tubing stub.
06:00 - 16:00 10.00 PULL DECOMP RIH picking up 4" drill pipe.
16:00 - 17:00 1.00 PULL DECOMP Got slow pump rates. P/U = 200K, SIC =150K, Rot = 175K, 7K ~bs
tq. Swallowed and ~ught fish.
17:00 - 19:00 2.00 PULL DEOOMP Jarred on fish to increasing increments from 250K to 350K. No good,
would not pull out of PBR.
19:00- 19:30 0.50 PULL DECOMP Pedo~ed blind backoff.
Printed: 4/12/2001 10:29:13AM
ii i i Operations iSummary RePort
Legal Well Name: Y-20
Common Well Name: Y-20A Spud Date: 2/20/2001
Event Name: REENTER & COMPLETE Start: 2/20/2001 End: 3/30/2001
Contractor Name: NABORS Rig Release: 3/30/2001 Group: RIG
Rig Name: NABORS 7ES Rig Number: N7ES
~i Date. ~.~'.' ' FrOm .To. ~°urs ·.Task: (~(:~dbe Phase~ !~ii '.:~i~: ~ Description of Operations
2/23/2001 19:30-20:30 1.00 PULL DECOMP CBU. 12 bpm, 1850 psi.
20:30- 00:00 3.50 PULL DECOMP POH.
2/24/2001 00:00 - 03:00 3.00i PULL DECOMP Finish POH.
03:00-03:30 0.50 PULL DECOMP L/D 13.1' cutjtfish.
03:30 - 06:00 2.50 PULL DECOMP P/U BHA #2, 60' washpipe to mill over GLM.
06:00 - 07:00 1.00 PULL DECOMP Cut and slip drilling line.
07:00 - 08:00 1.00 PULL DECOMP Service top drive.
08:00- 15:30 7.50 PULL DECOMP RIH to 11,577'.
15:30 - 19:30 4.00 PULL DECOMP Wash to 11,629', TOF DPM, and milled over GLM.
19:30 - 21:00 1.50 PULL DECOMP Washed to 11,671' while pumping hi-visc sweep. 12 BPM, 1850 psi.
No metal returns.
21:00- 00:00 3.00 PULL DECOMP POH to 5125' at report time.
2/25/2001 00:00- 02:30 2.50 PULL DECOMP Finish POH.
02:30 - 03:30 1.00 PULL DECOMP L/D I jt of washpipe, ring from junk damage near connection. L/D
milling shoe, medium wear.
03:30 - 04:30 1.00 PULL DECOMP P/U 3 jts washpipe and new milling shoe.
04:30- 10:30 6.00 PULL DECOMP RIH to 11,671'.
10:30 - 18:30 8.00 PULL DECOMP Washover tubing fl 11,671' to 11,686'. Rotary stalling, 15K ft-lb. Work
pipe, attempt to make progress. No forward progress. P/U=205K
'S/O=145K Rot=185K
18:30 - 21:00 2.50 PULL DECOMP Pmp dry job and POH to 7788'
21:00 - 22:00 1.00 PULL DECOMP Service top drive, hook up to hi-line power.
22:00- 0.00 PULL DECOMP POH.
2/26/2001 00:00 - 01:00 1.00 PULL DECOMP POH.
01:00 - 02:00 1.00 PULL DECOMP L/D oil jars, 60' wash pipe, mill shoe. Shoe 100% worn.
02:00 - 04:30 2.50 PULL DECOMP P/U outside cutter fishing BHA.
04:30 - 08:30 4.00 PULL DECOMP RIH t/9979'.
08:30 - 09:30 1.00 PULL DECOMP Cut and Slip drilling line. Service top drive.
09:30 - 10:00 0.50 PULL DECOMP RIH to TOF @ 11,629'.
10:00 - 12:00 2.00 PULL ~DECOMP Wash over fish. P/U and locate collar on pup jt below GLM @11659'.
Rotate to cut tbg.
12:00 - 17:00 5.00 PULL DECOMP POH to BHA.
17:00 - 19:00 2.00 PULL DECOMP L/D washpipe and BHA to fish. Hang off fish in jt washpipe and tbg
cutter.
19:00 - 20:00 1.00 PULL DECOMP 'Closed blind rams and pressured 9-5~8" casing to 3000 psi, could not
inject. Held 3000 psi on chart for casing test, 30 min. Bled off 100 psi.
(ok)
20:00 - 22:30 2.50 PULL DECOMP L/D fish, washpipe, cutter. Recovered 27.47' GLM & pups, 21.8' of full
jt below GLM pup. Partial cut by cutter on pup it. Full jt twisted off,
partialy sliced during previous milling.
22:30 - 00:00 1.50' DHEQP DECOMP PJU Schlumberger and RIH w/8.5" gauge ring/junk basket.
2/27/2001 08:00 - 09:30 1.50 FISH LINE LNR1 PJSM, P/U fishing assy - 8 1/8" overshot w/3 5/8" grapple
09:30 - 13:30 4.00 FISH LINE LNR1 RIH to 11513', P/U wt 210 k, S/O wt 145 k
13:30 - 14:30 1.00 FISH LINE LNR1 Brk circ, wash down, tag, engage fish at 11574' dpm, p/u 15 k over, set
dn 15 k on fish, P/U, sheared out of EZS¥ w/15 k over
14:30 - 15:30 1.00 FISH LINE LNR1 Drop dart, open pump out sub, slug pipe
15:30- 20:30 5.00 FISH LINE ;LNR1 POH to BHA
20:30 - 21:30 1.00 FISH LINE LNR1 L/D fish and fishing tools, 100 % recovery of fish
21:30 - 22:00 0.50 FISH LINE LNR1 Clear and clean rig floor
22:00 - 00;00 2.00 STWHIP LNR1 PJSM, P/U whipstock tools, M/U 9 5/8" Baker btm trip anchor whipstock
on 8" starter mill, 8" lower mill, 8 1/2" upper mill, 1 jt of HWDP, bumber
Printed: 4112/2001 10:29:13 AM
' : :'~ : : BP EXPLORATION Page4 of 10
~ :i~:,~ ~: :~: ~:~ ':: ::!~ ~ operatiOns Summary Report
Legal Well Name: Y-20
Common Well Name: Y-20A Spud Date: 2/20/2001
Event Name: REENTER & COMPLETE Start: 2/20/2001 End: 3/30/2001
Contractor Name: NABORS Rig Release: 3/30/2001 Group: RIG
Rig Name: NABORS 7ES Rig Number: N7ES
::.- ::-Date- .;~:~:~Erom ~T0 :: :H?urs~¢Task''~ ~od~!i!Phase t t : ~t~ . Description of Operations
N27/2001 22:00 - 00:00 2.00 S~HIP LNR1 sub, float, flex jt, hos
212812001 00:00 - 10:30 10.50 S~HIP LNR1 RIH w/9 5/8" baker btm trip ancher whipstock assy on 4" DP to 11545',
est P/U ~ 220 k, SIC ~ 155 k, circ, orient to 65 R of high side, slacked
off, tag EZSV at 11593' DPM, set whipstock w/20 k dn, good suda~
indi~tion of pins sheared, P/U, pull 5 k over to check anchor set, SIC
45 k dn to shear off whipstock, good suda~ indication of bolt sheared,
Top of whipstock slide at 11570'
10:30 - 13:30 3.00 S~HIP LNR1 PJSM w/all involved personnel on mud displa~ment, displa~d
seawater w/11.3 ppg LSND-HT mud at 10 bpm, 1650 -2600 psi,
overdispla~d by 200 bbls, mud ~ in 11.3 ppg, mud ~ out 10.9 ppg
13:30 - 17:00 3.50 S~HIP LNR1 Circ and ~nd to raise mud ~ to 11.3 ppg in/out w/10 bpm at 2625 psi
17:00 - 00:00 7.00 S~HIP LNR1 Milling window f/11571' - 11585' w/10.5 bpm at 2850 psi, 120 ~m, 10 -
14 k of torque, p/u 215 k, sic 155 k, rot 175 k
31112001 00:00 - ~:30 4.50 S~HIP LNR1 Milling window f/11585' - 11599' w/10 bpm at 2600 psi, 4~ gpm, 120
~m, 10 kwob, 10 - 14 k of torque, p/u 215 k, sic 155 k, rot 175 k
04:30 - 06:30 2.00 S~HIP LNR1 Circ hole clean w/hi-vis sweep at 10 bpm w/2650 psi while
recipro~ting and rotating through window, recovered +/- 160 lbs of
metal shavings in returns while milling &circ
~06:30 - 11:00 4.50 S~HIP LNR1 PJSM on tripping, monitor well, stable, slug pipe, POH to BHA
11:00 - 13:00 2.00 S~HIP LNR1 UD DC's and mill assy, 8 1/2" upper mill in gauge, all mills looked good
13:00 - 14:00 1.00~ S~HIP LNR1 Clear and clean rig floor
14:00 - 15:00 1.00 S~HIP LNR1 Pull wear bushing, flush out stack
15:00 - 18:00 3.00 BOPSUR LNR1 PJSM on testing BOPe's, ~U test equipment, Test Bop stack as
follows, all rams, valves, annular and lines f/250 - 3500 psi as per state
reg's, ~D test equipment, John Crisp w/AOGCC waived witnessing
BOP test, choke manifold was tested f/250 -3500 psi while TOH
18:00 - 18:30 0.50 BOPSUF LNR1 Install wear bushing
18:30 - 21:30 3.00 DRILL LNR1 PJSM on handling and running BHA, P/U 1 1/4 degree mtr, 8 1/2"
~C1 bit, MWD-GR-RES-PWD, orient, upload and test MWD, RIH w/
5" HWDP to 727'
21:30 - 22:00 0.50 DRILL LNR1 Shallow hole test MWD, OK
22:00 - 23:00 1.00 DRILL LNR1 Slip and cut 95' of Drill line
23:00 - 00:00 1.00 DRILL LNR1 Se~i~ Top Drive
3/2/2001 00:00 - ~:30 4.50 DRILL LNR1 RIH w/B~, 1 1/4 degree mtr, 8 1/2" MXC1 bit, MWD-GR-RES-PWD
mtr, on 4" DP to 11372'
~:30 - 05:30 1.00 DRILL LNR1 Madd pass tie-in Icg w/mwd~r f/11372-11560'
05:30 - 10:30 5.00 DRILL LNR1 Orient mtr to 65 R of HS, a~empt to work through window at 11472', no
go, many a~empts at various orientations, no suc~ss
:10:30- 15:00 4.50, DRILL JUNK LNR1 POH to B~
15:00 - 17:30 2.50 DRILL JUNK LNR1 POH w/B~, Download MWD, UD BHA, bit was cored out w/all inner
row teeth groud smooth to cone
17:30 - 18:30 1.00 S~HIP JUNK LNR1 PJSM on handling BHA, P/U, 9 DC's, std back in derrick
18:30 - 20:30 2.00 S~HIP JUNK LNR1 Pedorming general rig maintenan~ while waiting on W/L to arrive on
Io~tion
3/3/2001 01:30 - 05:00 3.50 S~HIP JUNK LNR1 PJSM, P/U whipstock tools, M/U 9 5~8" Baker btm trip anchor whipstock
on 8" sta~er mill, 8" lower mill, 8 1/2" upper mill, 1 jt of HWDP, humber
sub, float, flex jt, hos, rih w/dc's and hwdp, suda~ test mwd, ok
05:00 - 14:00 9.00 S~HIP JUNK LNR1 RIH w/9 5~8" baker btm trip ancher whipstock assy on 4" DP to 11420',
est P/U ~ 206 k, SIC ~ 148 k, circ, orient to 58 R of HS, slacked off,
tag ClBP at 11474' DPM, set whipstock w/18 k dh, good suda~
~indi~tion of pins sheared, P/U, pull 5 k over to check anchor set,
chewed orientation at 58 R of HS, SIC 38 k dn to shear off whipstock,
good suda~ indi~tion of bolt sheared, Top of whipstock slide at
Printed: 4/12/2001 10:29:13 AM
:' . : BP EXpLoRATION Page 5 of 10
i :' ::Operati°ns'SUmmary Report
·
Legal Well Name: Y-20
Common Well Name: Y-20A Spud Date: 2/20/2001
Event Name: REENTER & COMPLETE Start: 2/20/2001 End: 3/30/2001
Contractor Name: NABORS Rig Release: 3/30/2001 Group: RIG
Rig Name: NABORS 7ES Rig Number: N7ES
:: Date's-: From -To iH~O~SI~ ~TaSk~ :~oUdbe i~phase! ~ : ~ : Description of Operations
31312001 05:00- 14:00 9.00 STWHIP JUNK LNR1 11449'
14:00 - 00:00 10.00 STWHIP! JUNK LNR1 Milling window f/11449' - 11465', drill formation f/11465'- 11479 (note:
undergage hole at 8"fl 11470-11479)w/10.5 bpm at 2600 psi, 2-12 k
web, 50 - 120 rpm, 445 gpm, 10 - 14,000 ftlbs of torque, p/u 206 k, s/o
148 k, rot 190 k
31412001 00:00 - 02:30 2.50 STWHIP JUNK LNR1 Giro hole clean w/hi-vis sweep at 10 bpm w/2650 psi while
reciprocating and rotating through window w/pumps on & off,
recovered +/- 185 lbs of metal shavings in returns while milling & circ
02:30 - 08:30 6.00 STWHIP JUNK LNR1 PJSM on tripping, Monitor well, stable, POH to BHA
08:30 - 11:00 2.50 S'I'WHIP JUNK LNR1 POH w/HWDP, L/D DC's, MWD, Mill Assy
11:00 - 11:30 0.50 STWHIP JUNK LNR1 Clear and clean rig floor
11:30 - 12:00 0.50 STWHIP JUNK LNR1 Pull wear bushing
12:00 - 13:00 1.00 STWHIP JUNK LNR1 Flush out wellhead and bop stack
13:00 - 14:00 1.00 STWHIP JUNK LNR1 Run wear bushing
14:00 - 16:30 2.50 DRILL JUNK LNR1 P/U, M/u BHA - 1 1/4 degree motor, MWD-GR-RES-PWD, orient,
upload, RIH w/Bt-lA to 820', surface test MWD, OK.
16:30 - 17:30 1.00 DRILL JUNK LNR1 Cut and slip drill line
17:30- 18:00 0.50 DRILL JUNK LNR1 Service top drive and crown
18:00 - 23:00 5.00 DRILL JUNK LNR1 RIH to 11372', orient bit to 80 R of HS, slacked off to 11470', washed to
11485', no problems going through window f/11449 - 11465'
23:00 - 23:30 0.50 DRILL LNR1 Drld and survey w/1 1/4 motor, MWD-GR-RES-PWD f/11479 - 11485,
AST .25 hfs
23:30 - 00:00 0.50 DRILL LNR1 Giro at 11485', 9 3/4 bpm 2450 psi, 408 gpm
31512001 00:00 - 00:30 0.50 DRILL LNR1 Circ w/11.3 ppg in/out
00:30 - 01:30 1.00 DRILL LNR1 Perform FIT to 12.4 ppg emw at 11465' md/8482' tvd, pumped 1.6
bbls at 1/4 bpm to 485 psi w/11.3 ppg mw, s/d pumps pressure
stabilized at 404 psi in 10 mins, Bled off, rec'd 1.5 bbls
01:30 - 16:00 14.50 DRILL LNR1 Drld and survey w/1 1/4 motor, MWD-GR-RES-PWD f/11485 - 11934',
art 7.3 hrs, ast 4.2 hfs
16:00 - 18:30 2.50 DRILL GIRO LNR1 Pop off leaking on # 1 pump, S/D pump, POH w/1 std, Circ at 11840 -
11741 w/pump # 2 at 105 spm, 1325 psi, 257 gpm, 30 rpm and 6-7000
ftlbs-torq while changing out pop off valve and seat on # 1 pump
18:30 - 00:00 5.50 DRILL LNR1 Ddd and survey w/1 1/4 motor, MWD-GR-RES-PWD f/11934'- 12142',
art 4.5 hfs, ast 0 hfs
3/6/2001 00:00 - 01:30 1.50 DRILL LNR1 Drill & survey w/1 1/4 Deg mtr, MWD-GR-RES-PWD, f/12,142' to
12,216' (8 1/2" TD). art = 3/4 Hr asr = 0 Hrs.
01:30 - 03:00 1.50 DRILL LNR1 Circulate hole clean, monitor well - static
03:00 - 04:30 1.50 DRILL LNR1 POH to 11,372'. No hole problems. Monitor well - static. RIH to 12,216'
w/no hole problems.
04:30 - 07:00 2.50 DRILL LNR1 Circulate hole clean. Sweep hole w/Hi vis sweep. Spot Hi-vis liner pill.
Monitor well - static.
07:00 - 14:30 7.50 DRILL LNR1 POH to 11,372' & monitor well - static. Drop steel rabbit & con't POH &
L/D BHA # 4.
14:30 - 15:30 1.00 CASE LNR1 Clear floor & PJU 7" Csg equipment.
115:30 - 18:30 3.00 CASE LNR1 PJSM. RIH w/22 its 7", 26//, L-80, BTC Csg w/Float shoe, float collar,
latch collar, & 4 cent to 943'. Giro liner vlume.
18:30 - 00:00 5.50 CASE LNR1 Con't RIH w/DP (filling every 10 stands) to 11349'.
3/712001 00:00 - 01:00 1.00 CASE LNR1 M/U cmt hd, circ at 11349', p/u wt 185 k, s/o wt 140 k
01:00 - 05:00 4.00 CASE LNR1 !RIH f/11349 - 12121', tight spot w/30 k set dn wt, attempt to wash dn,
~)acked off, p/u to 12061', brk circ at 3 bpm 470 psi, wash dn to 12143',
3acked off, work pipe, establish Giro, wash dn to 12216'
05:00 - 13:00 8.00 CASE LNR1 Break Giro, reciprocating pipe, p/u wt 200 k, s/o wt 140 k, stage pumps
up in 1/2 bbl increments to 6 bpm at 1230 psi, packed off to 1900 psi,
Printed: 4/12/2001 10:29:13AM
BAt;a, T./llOli~l;~3 IT./ I--&T,/i--I
Subject: Re: Changes to Y-20A Permit ~201~25 ~
Date: Tue, 27 Feb 2001 11:33:40 -080~----'~
From: Tom Maunder <tom_maunder@admin.state,ak.us>
To: "Sherritt, Allen" <SherriJA@BP.com>
CC: "Bunch, Anthony S" <bunchas@BP.com>, "Stone, Dan M" <StoneDM@BP.com>
Allen,
Thanks for the head up regarding the changing situation on Y-20 and Y-20A. We
have discussed the progress or lack thereof of the intended pre-rig abandonment
and the subsequent intent to accomplish the task during decompletion. The
operational path has continued to the current situation where as you note, the
condition of the remainder of the original completion is such that additional
progress is unlikely.
Your proposed changes to the plans are acceptable. As you note, the abandonment
of the lower portion of the Y-20 wellbore will be accomplished with a
combination of the bridge plug, liner cement and liner top packer.
Good luck with your operations. Call with any questions.
Tom Maunder
"Sherritt, Allen" wrote:
As per our conversation, the following is an outline of the required changes
to the Y-20 P&A and Y-20A forward Program, (Sundry #301-01g, Permit
#201-025.)
The decompletion of the existing 4 1/2" tubing, to the proposed depth of
12,300' MD, was unsuccessful. The decision has been made to cease
decompletion operations and sidetrack above the original kick-off point.
The current tubing stump is at 11,657' MD, leaving collapsed tubing @
11,727' MD and a fish across the production packer @ 12430' MD.
An attempt to inject into Y-20 was unsuccessful, however the integrity of
the g 5/8" casing was confirmed, as the g 5/6" casing held 3000 psi for 30
minutes. The P&A "bullhead" cement job can not be accomplished without the
ability to inject into the original well bore. Therefore an EZSV/bridge
plug, 7" 150' liner lap cement and 9 578" x 7" liner top packer will be used
to fulfill the Y-20 P&A requirements.
A bridge plug has been set @ 11,640' MD, putting the new KOP @ 11,600' MD.
Forward plan is to set a whipstock, kick-off drilling out into the Kingak JD
formation, holding angle @ -55 degs. The 6 1/2" hole will TD in a siltstone
just above the Sag River Formation, @ -12,220' MD / 8817' TVDss, (-620' of 8
~/2" to be drilled.). There are no proposed faults in this interval and
lost circulation is not expected. An FIT to 12, 5 ppg will be performed
after drilling 20' of new formation, (307 bbi kick tolerance.)
A 7" 26# L-60 drilling liner will be run from 12,220' MD tied back into the
9 5/8" casing to 11,450' MD, (150' liner lap.) The liner will be cemented
in place with ~41 bbis of 15. 8 ppg class G cement. This will provide
I of 2 2/27/01 11:33 AM
H.e: t,iRarlges tO Y-ZU/~, I-'ermK ~ZUYU>'O
sufficient excess to ensure cement across the liner top packer, @ 11,450'
MD.
Drilling out the 7" shoe, the new directional plan will tie into the
original Y-20A plan at Target point #1. The BHL, targets and trajectory are
unchanged from this point forward. There is only a minor change to the
cement volumes required on the 4 1/2" liner, (< 10 bbls.)
As we discussed, with the Potential of lost circulation in the 6 1/8" hole
and the probability of having to perform a down squeeze "top job" on the 4
1/2" liner lap to achieve the P&A, the 7" cement job will provide a more
reliable solution for the P&A of Y-20.
Hopefully I have covered everything, if you have any questions, comments or
concerns, give me a shout. As soon as t have completed the "new" proposed
completion drawing, I will fax you a copy.
Thanks,
Allen Sherritt
BP Alaska Drilling and Wells
* (907) 564-5204 (Direct)
* (907) 240~8070 (Mobile)
* sherrija@bp.com
* (907) 564-4040 (Fax)
* MB 6-3/681B
Tom Maunder <tom maunder@admin.state.ak, us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
2 of 2 2/27/01 11:33 AM
BII, II ~1 lBIIIIlil~ 1 III1:1 lB
JAN o. 2001
Alaska Oil & Gas Cons. Comrnissio/~
Anchorage
BP Exploration / ARCO Alaska Inc.
To:
From:
Subject:
Reference:
Tom Maunder - AOGCC Date: January 15, 2001
Allen Sherritt
7ES Operations Drilling Engineer
Y-20 Application for Sundry Permit - P&A for Sidetrack Operations
APl #50-029-21587-00
Sundry approval is requested for the proposed DS Y-20 perforation P&A. Y-20 is a horizontal producing well
that was completed in May of '86. In 1987, while attempting to obtain pressure static data, 2 amerada
pressure gauges and 3 cutter bars where left in the tubing at 12,359' (production packer at 12430'.) All
subsequent fishing attempts were unsuccessful. Additionally, the tubing is collapsed below the sliding sleeve
at 11,723'. It is believed this occurred during a mud acid/N2 treatment in 1992. The job was cut short due to
excessive inner annulus pressures. A camera was run in '97 to assess the tubing obstruction, and confirmed
that the first joint below the sliding sleeve was collapsed. The area is small enough to hang 1-11/16" tools.
The well has been shut-in since December of 1996.
The purposed sidetrack will replace the current well bore with an extended horizontal well bore approximately
6021 feet from the original well, to recover the remaining Y-20 and surrounding area reserves. The Y-20A
sidetrack is currently scheduled for Nabors 7ES beginning around February 10, 2001. The pre-rig work for
this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. Below is an
outline of the proposed P&A and sidetrack operations.
Pre-Riq Work:
1. O
Perform injection test to confirm injection rates for up coming rig P&A. T x IA are in
communication due to collapsed tubing at 11,740' MD.
Note: The results of this test will determine required rig P&A operations for
Sundry application. Please schedule this test at your earliest convenience.
Wait for Approved Sundry prior to completing the remainder of pre-rig work.
.
.
RU slickline and drift tubing for upcoming tubing cut.
RU E-line. Chemical cut the 4½" L-80 tubing at +/-11,718' MD (as per the 5/29/86
Tubing Summary, this is -5' down into the 10' pup joint of 4-1/2" tubing immediately
above the Otis Sliding Sleeve). On 5130197, a video log was run to assess the
tubing obstruction at -11,723' MD. The video showed an egged shaped collar
in the 10' pup joint immediately above the Otis Sliding sleeve and the 10' pup
joint immediately below the sleeve was collapsed.
Displace the well to clean seawater by circulating down tubing through the tubing cut.
Continue to circulate until clean seawater returns to surface. Freeze protect top
2200' MD with diesel. The well should not be left with methanol as a freeze
protect fluid, diesel only.
Note: The integrity of the 9 5/8" annulus cannot be confirmed due to open
perforations and the collapsed tubing. The 9 5/8" will be tested with the rig.
STATE OF ALASKA
ALASK~ .L AND GAS CONSERVATION COMI
APPLICATION FOR SUNDRY APPROVAL
310N
1. Type of Request: [] Abandon
.
[] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
Location of well at surface .,//' ,,/'
1440' SNL, 347' WEL, SEC. 33, T11N, R13E, UM
At top of productive interval
1903' SNL, 1087' WEL, SEC. 05, T10N, R13E, UM
At effective depth
2547' SNL, 1950' WEL, SEC. 05, T10N, R13E, UM
At total depth
2547' SNL, 1950' WEL, SEC. 05, T10N, R13E, UM
6. Datum Elevation (DF or KB)
KBE = 89.03'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
Y-20
9. Permit Numb, e,r
186-084
10. APl Number
50- 029-21587-00 v"
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12.
Present well condition summary .,//
Total depth: measured 13866 feet /'
true vertical 9012 feet
Effective depth: measured 13866 feet
true vertical 9012 feet
Casing Length Size
Structural
Conductor 110' 20"
Surface 3095' 13-3/8"
Intermediate
Production 12656 9-5/8"
Liner 1436' 4-1/2"
Plugs (measured)
Junk (measured)
Obstruction in tubing at 11740' (Approx.) (02/97)
Camco Fish at 12359' (06/87)
Cemented MD TVD
8 cu yds Concrete 110' 110'
4389 cu ft Permafrost 3095' 2697'
920 cu ft Class 'G' 12656' 8983'
Uncemented Slotted Liner 12430' - 13866' 8946' - 9012'
Perforation depth: measured Slotted Interval: 12659'- 13822'
true vertical Slotted Interval: 8983' - 9011'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 12430'
Packers and SSSV (type and measured depth) 9-5/8" packer at 12430'; Otis SSSV LN at 2149'
JAN J 9 2001
Alaska Off & Gas Cons. C°mrnission
Anchorage
13. Attachments
[] Description Summary of Proposal
4. Estimated date for commencing operation
January 29, 2001
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Number: Allen Sherritt, 564-5204
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Prepared By Name/Numbec Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed DanStone ~------~.,,.....~.,, ,~ Title Senior Drilling Engineer Date I?t-'tI ~
Conditions of Approval: NotifYPlugCOmmission,SOintegrity _~"'/ representatiVeBoP Test may/N,~,'witneSs '~Location'--~c~earance¥ °~'' ~''' ~ ~' ¼~,.k-i ApprovaII No.
Mechanical Integrity Test
Approved by order of the Commission ~,.~L.,Cx.~.
Subsequent form required 10- 1..[~.) ~
Commissioner Date
Form 10-403 Rev. 06/15/88
Submit In Triplicate
5. O Test the 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes.
6. O
Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test
from below to 1000 psi. Secure well. Remove the well house and flowlines. If
necessary, level the pad. Please provide total well preparation cost on the handover
form.
Ric~ Operations:
1.
2.
3.
4.
5.
6.
10.
2.
14.
15.
16.
17.
18.
RECEt c'E'
MIRU Nabors 7ES. ,./,'qN ]. q~ 2001
CirculateNipple down°Ut tree.freezeNipplePr°tecti°nup andandtestdisplaCeBoPE.Well to seawater. Set TWC. Alaska Oil & Gas Cons. Commissio¢~
Anchorage
Pull and lay down 4-1/2" tubing from E-line chemical cut at -11,718' MD.
RIH with 40' of washpipe with overshot and outside cutter. Washover tubing and perform outside cut
below collapsed tubing at -11,727'. POOH.
RIH 4" DP and overshot to tubing stump. RU E-line and perform cut at -12,300' MD, (do not tag fish at
12,359' MD). POOH.
MU 9-5/8" window milling assembly and RIH to ~12,250', (-50' below window point.) POOH. * Notify the field AOGCO representative with intent to plug and abandon *
RIH and set 9-5/8" EZSV to position top of whipstock at _+12,200' MD. PU out of EZSV and test 9 5/8"
casing to 3000 psi for 30 min. ,/,
Sting into EZSV with running tool, establish injection below packer and displace 33 bbls cement
(includes 5 bbls for squeeze into formation.) POOH and lay down running tools.
RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock as desired and set on
bridge plug. Mill and dress window in 9-5/8" casing at -12220' MD. POOH.
RIH with,,6-1/8" drilling assembly (MWD/GR/Res)to whipstock. Perform FIT to 9.5 ppg. Kic,k, off and dril!
the 6-1/8 production section as per directional plan in Zone 4, to an estimated TD of +18,210 MD (9062
TVD). , ....
Run and cement a 4-1/2 12.6# production liner, fully cemented into the 9-5/8 casing liner lap, -12,070
MD. Displace well to clean seawater. POOH.
Test the 4-1/2" x 9-5/8" casing from the 4-1/2" landing collar to surface to 3000 psi for 30 minutes..
RIH with 2-1/2" perf guns conveyed on 2-3/8" X 4-1/2" DP. Perforate _+1500' of selected interval w/___600
psi overbalance to the reservoir. Monitor well and POOH LD DP.
Run 4-1/2", 12.6# L-80 completion tying into the 4-1/2" liner top.
Set packer and test the tubing to 3500 psi and annulus to 3000 psi for 30 minutes.
Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
Freeze protect the well to -2200' and secure the well.
Rig down and move off.
Post-Rig Work:
1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the new production packer. Install
gas lift valves.
Estimated Pre-Rig Start: 01/29/01
Estimated Spud Date: 02/10/01
Allen Sherritt
Alaska Drilling and Wells
Operations Drilling Engineer
564-5204
TREE: 4" CIW
WELLHEAD: GRAY
ACTUATOR: AXELSON
SMALL
CMT'd
13-3/8", 72#/ft, I
L-80, BTRS I 3095
IKOP 1: 400'
I
ANGLE:43° to 54° I
I
4-1/2", 12.6~/ft, L-80, IPC
AB MOD BUTT TUBING
TUBING ID: 3.958"
CAPACITY: 0.0152 BBL/FT
WARNING !
Obstructed Tubing
11,740'
WARNING ~
6/26/87 CAMCO FISH IN HOLE
@ 12359 WLM -SEE TELEX
FOR DESCRIPTION
Y-20
KB. ELEV = 89.03'
BF. ELEV = 51.13'
SSSV LANDING NIPPLE I Z149'
(OTIS)(3.813" ID)
I
GAS LIFT MANDRELS
(OTIS LBD W/RA LATCH)
N' MD(BKbl) 1VL)ss
8 3523 2901
7 6443 4926
6 8370 6286
5 9498 7094
4 10157 7585
3 10891 8049
2 11549 8436
1 11656 8502
SLIDING SLEEVE
4-1/2" OTIS
(3.813" MIN. ID)
I11723'
11777'
11817'
12418'
12430'
4-1/2" "X" NIPPLE
(OTIS) (3.813" ID)
4-1/2" "X" NIPPLE
(OTIS)(3.813" ID)
Tubing Seal Assy
9-5/8" PACKER
(TIW)
9-5/8", 47#/ft,
L-80, BTRS J 12646'
& NSCC
MAXIMUM HOLE
DEV: 88° at 13,800'
DEVAT 8800 TVD 72 °
DEV AT 13866' TD IS 88°
Solid 4 1/2" - 13.5#L-80 AB Mod. BTR
Liner
TIW Packoff Bushing
4-1/2" , 13.6#/ft, NB FL 4S,
SLOTTED LINER
SLOTTED LINER DEPTHS
TOP: 12659'
BOTOM: 13823'
HORIZONTAL SLOTTED LINER
DATE
5/31/86
11/25/89
2/21/97
12/21/98
REV. BY
).ROMBER6
v~MM
SRB
SRB
COMMENTS
COMPLETION
PUT ON MACINTOSH
Tubing Obstruction / Old Fish
PC Revision
PRUDHOEBAYUNIT
WELL: Y-20(5-10-13)
APl NO: 50-029-21587
SEC 33; TN 11; RGE 13
BP Exploration (Alaska)
RECEIVED
JAN
Alaska Oil & Gas Cons. Commission
Anchorage
TREE: 4" CIW - 5M
WELLHEAD: Gray - 5M
Y-=0A Proposed Co,npletion
GL Elevation = 30.2'
Nabors 7ES RKB = 59.5'
4-1/2" 'X' Landing Nipple with 3.813" seal bore. [ 2200'
13 318", 72 #/ft, L-80 BTRS [
3095' J
13 3/8" x 9 5/8", Cement and Arctic Pack.
4-1/2" x 1-1/2" Camco 'MMG' Gas Lift Mandrels with
handling pups installed above and below.
GAS LIFT MANDRELS
.
IVD Size
1 ' 1-1/2"
2 ' 1-1/2"
3 ' 1-1/2"
4 (or ljt above 1-1/2"
packer)
Valve Type
_
RP Shear
DV
DV
DV
4-1/2" 12.6# L-80, IBT Mod Tubing
RECEIVED
JAN 1 9 7_001
Alaska Oit & Gas Cons. commission
Anchorage
9 5/8" x 4 1/2" Baker'S' Production Packer" @ -11900' MD
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" WireLine Entry Guide spaced-out into liner top.
4-1/2" Liner ZXP top packer and Flexlock hanger.
Window Milled from Whipstock
Top of Window at +/- 12200' MD
EZSV set at +/-12220' MD
TOC at +/-12220' MD
TOF at +/-12359' MD
LinerTopat [ 12430'
9-5/8", 47 #/ft, L80, BTRS ~
& NSCC
Slotted Liner at +/-12659' MD to
13,823'MD
4-1/2" 12.6 #/ft, L-80, I 13,866' I
4-1/2" 12.6 #Iff, L-80, IBT-Mod I +/-18221' I
:
':~ ~ ;i ~:' :~H°riz°ntal Sidetrack int° Z°ne 4 Sands 11
PRUDHOE BAY UNIT
WELL: Y-20A
APl #: 50-029-21587-01
Date
1/8/01
Revised by
JAS
Comments
Proposed completion
MICROFILMED
9/1 ~/00
DO NOT PLACE
ANY NEW MATERIAL
IS PAGE
STATE OF ALASKA
AI.J ..... ,A OIL AND GAS CONSERVATION COMMISS,,..,,-,I
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging Perforate
Pull tubing __ Alter casing __ Repair well
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development X
Exploratory
Stratigraphic __
Service
4. Location of well at surface
1440'SNL, 347' WEL, SEC. 33, T11N, R13E, UM
At top of productive interval
1900'SNL, 1075' WEL, SEC. 05, TION, R13E, UM
At effective depth
78'SNL, 4148'WEL, SEC. 04, TION, R13E, UM
At total depth
2727' SNL, 1936' WEL, SEC. 05, T1ON, R 13E, UM
Other~
6. Datum elevation (DF or KB) %
KBE=89.03 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-20(33-05-10-13)
9. Permit number/approval number
86-84 /
10. APl number
50- 029-21587
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
Length
.-
13866 feet
9011 feet
13866 feet
9011 feet
Plugs (measured)
Junk (measured)
Size
Cemented
See Attachment I
Slotted linear Intervala: 12659 to 13822
true vertical subsea
Tubing (size, grade, and measured depth) 4 1/2" 12.6 @ 12430'MD
Packers and SSSV (type and measured depth) Packer@ 12430'MD, SSSV@2164
13. Stimulation or cement squeeze summary See Attachment II
Measured depth
True vertical depth
BKB
RECEIVED
00T - 7
Alaska 0il & 6as 0ohs. 6omr~issiO~.
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
670 2258 643 1330
/
1100 .' ~' 3040 440 2030
Tubing Pressure
241
229
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas m Suspended
Service
17. I hereby certify th~ the fore,going is true and correct to the best of my knowledge.
O~ ,n, }- i ,",)'~ ~'U~,~.-~ Title Senior Technical Assistantl
Signed ,/M/v~_(J,~,, (" '
Form 10-40,~ Rev 06/15/88 T
Date //'~//~;//,~,~
SUBMIT IN DUFCLI6ATE ~
WELL Y-20(33-05-10-13)
ATTACHMENT I
CASING
Structural --
Conductor 110'
Surface 2956'
Intermediate 5356'
3261'
Production
Liner 1436'
LENGTH SIZE
20"
13 3/8"
9 5/8"
9 5/8"
__
4 1/2"
CEMENT MD TVD
4389 c.f. Permafrost
920 cfi. Class "G"
w/1% CFR+.08% HR7
Slotted Uncemented
148' 148'
3095' 2697'
5395' 4311'
9395'-12656' 7110'-8983'
12430'-13866'
8946'-9013'
fjh
7/01/93
RECE[VF.D
OC'.'F---'/ 1993
Alaska Oil & Gas Oons. C;ommissio~'
Anchorage
7/18&19/92
WELL Y-20(33-05-10-13)
STIMULATION OPERATION
ATTACHMENT II
Performed a MUD ACID/FOAM DIVERTER Treatment using the
following fluids:
FLUIDS PUMPED:
12500 GAL, 11.1% HCL, 75PPM FE .4% ACI-274, .4%NE-41,24#
FERROTROL 210
1 2500 GAL, 11.4% HCL, 68 PPM FE .4% AC1-274, .4%NE-41,24#
FERROTROL 21 0
1 2500 GAL, 6.02% HCL/1.6% HF, 8.95 PPM FE, .4% AC1-274,.6%
NE-41, .2% IVlS-1 O, 24# FERROTROL-21 0, 10# F-300
1 2500 GAL, 5.82% HCL/1.6% HF, 8.96 PPM FE, .4% AC1-274,.6%
NE-41, .2% MS-1 0, 24# FERROTROL-210, 10# F-300
25000 GAL 2% NH4CL, NE-41
7500 GAL GEL WATER W/20 # GEL, 60 GAL FAW-1 6
1 92 BBL SEAWATER FLUSH
850,000 SCF N2
fjh
7/01/93
R EC E IV
OCT-~-f ~993
Aiaska 0il & Gas Cons,
Anchorage
Standard Alaska
Production Company
000 Eosl Ben,on Boule,,.
PO Bo~ 196612
Anchorage Alaska 99519-6612
1907} 564-511 I
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
INDEXED
STANDARD
ALASKA PRODUC-~ION
Date: 09/21/87
TI: 78183
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~'B-27 Flowing/Gradient 09/07/87
~ B-27 " " 09/13/87
"B-28 Static Gradient 09/06/87
---B-29 Flowing Gradient 09/10/87
"-J-2i Static Gradient 09/12/87
'"J-23 " " 09/10/87
~ K-1 " " 08/21/87
'"' Y-20 " " 09/03/87
'"Y.20 " " 09/06/87
~Y-21 " " 09/08/87
~ Kuparuk State 22-11-12 Static Gradient
Camco
I1
Camco
Camco
Camco
Camco
C amc o
Camco
Camco
Camco
08/26/87 Camco
Rece i ved
Date
' A~sk~ Oi! & ~s O0ns. Gommisslor~
Anchorag~
Victoria Aldridge
INFORMATION CONTROL
Well Records LR2-1
Standard Alaska
Production Compan)
900 Eas! B~nson Boulevard
P.O. Box 19661:2
Anchoroge, Aloska 99519-66
(907) .564-51 ! !
1
ARCO
CHEVRON
EXXON
INDEXED
STANDARD
ALASKA PRODUCTION
TEXACO Date: 0 6 / 30 / 87
TO: MOBIL Tt: 78013
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
F-14
M-6
U-4
Q-1
Y- 20
Temp 0 6 / 15 / 87 # 1 SURF- 2000 Camco 5"
Flowmeter Water Hold Up 06/10/87 #1 10950-11550 Camco 5"
Injection Profile 06/1 2/87 #1 11 290-11719 Camco 5"
Prod. Prof. Flowmeter Temp. 06/13/87 #1 9250-9600 Camco
GR 06/09/87 #1 11500-1 2300 Camco 5"
1!
Received
a Oi &A6n~ShoOr~;. Commission
Celina Plack
I NFORMAT I ON CONTROL
Date Wel I Records LR2-1
A unit at lhe original Slonda,d C~I Company
Founded in Cleveland. C~io. ,n 1870
$~andard Alaska
P~oduc~ion Cornpm
900 Fost B~n~on Boulevord
PO. Box 196612
Anchoroge, AIosko 99519-6612
1907) .564-51 ! I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
STJ%N DJ%I~D
ALASKA PRODUCTION
D.te: 06/24/87
TEXACO
ZO: TI: 77994
MOBIL ,
PHILLIPS
STATE OF ALASKA
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
F-31 Static Gradient 06/16/87 Camco
R-19 Static Gradient 05/15/87 Camco
Y-20 Flowing Gradient 06/07/87 Camco
Y- 20 BHPD 06/07/87 Camco
Received
Dote
u,,.! oI ~h~ o..tl.,,.,I .%,~J,,¢l[,,,I ~_~1
C
~ AJaska 0il & (3as Cons. Commission
Anchora~
Celina Plack
I NFORMAT I ON CONTROL
We I I Records LR2- f
Slondard AIo,l~a
Production Company.
~ Eosl J~nson
Ancho~oge. Alosko ~bl9-661~
~907) 564-51 I I
INDEXED
DALLAS
ARCO ST/~N D~RD
CHEVRON AL ASI/~'X PRODUCTION
EXXON Date: 06/15/88
TEXACO 78958
TO: TI:
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
.
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
Y-20
Pressure Build-Up 05/23/88 Camco
JUN 2 0 ]988
Alaska 0il & Gas Cons. Commission
Anchorage
Recelved
Date
A un,t ol ~he o,,9,or~,l ~'.,,d~,d C),l Co.np¢,,,y
fOv,,ct~'¢! ,~ (-I¢.eln,,,I ('%~,n ,,,
Jennifer Dietz
I NFORMAT I ON CONTROl_
Well Records LR2-1
Standard Alosl~a
Produc lion Company
900 Eos! Benson Boulevard
P.O Box 196612
Anchorage. Alaska 99519-6612
(907) 564-5 I I I
INDEXED
DALLAS
ARCO ST~ND~RD
CHEVRON ALASKA PI~ODUCTION
EXXON Date: 06/08/88
TEXACO 78928
TO: It:
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is belng submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to thls office:
Y-20
Y-24
Pulse Test 05/23/88 Camco
Pulse Test 05/23/06/01/88 Camco
Rece i v~
jUN
.... ~. ~..~ 6nmmission
Al,2Ska u. ~ ~
Anchorage
A un,! o! ,he o"ginol .~tondo,al O~1 Co,-II;~n1,
Founded ,n Cle,elond. C~io ,n 1870
Jennifer Dietz
~NFORMAY ~ ON CON/ROI
Wel I Records LR2- I
.S~o ndo,cl AID r,l~ o
P~odu¢lion Componv
900 I~o~t
P 0 ~x 196612
A~(horog¢. Alaska ~519-6612
INDEXED
DA~I~S
ARCO ST/t.N D/~RD
CNZv~ON ALASKA PRODUCTION
06/08/88
E ~XiXON Date:
TEXACO 78928
TO: TI:
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returnlng It to this office:
Y-20
Y-24
Pulse Test 05/23/88 Camco
Pulse Test 05/23/06/01/88 Camco
Rece I v(
Jennifer Dietz
INFORMAl ION CONiROL
Wel I Records LR2-1
Slandard Alaska
Produc'lion Compan
900 Ease Ben$on Boule,.,,~
P.O. Boa 196612
Anchorage. Alaska 99519-66
lq07) 564.511 I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 11/05/86
lO: MOBIL- TI: 77490
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this offlce: -
D-11 Caliper 10/27/86 #1 29-9510 Camco 5"
G-19 CET 06/27/86 #1 10330-11550 Sch 5"
M-4 Perf. Record 05/25/86 #1 9370-11660 Sch 5"
M-17 Perf. Record 06/01/86 #1 11000-11749 Sch 5"
N-7 Packer Depth 05/21/86 #1 9400-10450 Sch 5"
R-12 Perf. Record 06/03/86 #1 10400-10968 Sch 5"
R-23 Perf. Depth Record 05/06/86 #1 11490-11900 Sch 5"
U-12 Perf. Record 05/30/86 #1 10800-11100 Sch 5"
X-5 CET/GR 05/10/86 #1 9468-10700 Sch 5"
Y-20 GCT 06/21/86 #1 Surf-12107 Sch 5"
Y-23 GCT 06/23/86 #1 -8-11566 Sch 5"
Rece i ved
Date
Iround~
· ,--~o 0il & Gas Cons, C0mmiss
~'~"~'"' Anchorage
,ondord Chi [o,nponl
d. ~,o. ,n IB70
Vict~ Aldridge
I NFORHAT I ON CONTROL
Wel I Records LR2-1
September 29, 1986.
Telecopy No.
(907) 276-7542
ADMINISTRATIVE APPROVAL NO. 213.1
Re.~. Standard Alaska Production Company request to waive
productivity pro£iles, Prudhoe Bay Unit wells JX-2, B-30,
Y-20, G-29, G-27, Y-21.
Mr. T. N. Tyler
Manager Reservoir Operations
Standard Alaska Production Company
P. O. Box 196612
Anchorage, AK 99519-6612
Dear Mr. Tyler:
By letter dated' September 24, 1986, Standard Alaska Production
Company has requested waivers of productivity profiles required
by Conservation Order 165, as amended by Conservation Order
No. 213, in wells JX-2, B-30, Y-20, G-29, G-27 and Y-21.
The Alaska Oil and Gas Conservation Commission has reviewed the
need for productivity profiles in these wells. The Commission
has determined that these data are not necessary for proper
monitoring of the Prudhoe Oil Pool performance.
Therefore, by administrative approval authorized by Conservation
Order 213, Rule 2, the Commission waives productivity profile
requirements in Prudhoe Bay Unit wells JX-2, B-30, Y-20, G-29,
G-27 and Y-21.
Sincerely, ~
Lonnie C. Smith
Commissioner
jo/3 .AA213
PO Box 196612
A~cho~,oge. Alo~o ~.519-~1~
(907) .'~4-5 ! I I
INDEXED
DALI. S
,A~CO
CHEVRON
EXXON
STANDARD
ALASKA PRODUCTION
Dote: 07/29/86
TEXACO
TO: TI: 77227
MOBIL
pHZLLZps
--GEOSCIENCES
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The roi Io~Ing materiel is being submitted herewith. Please ockno~ledDe receipt by
signing a copy of thls lei-let end returning It to this office:
---A-22
?A-30
~A-30
C-1 lJ
G_i~-
_ G-16
?, H-6
--- H-6
H-24~
-- H-25
? M-4.
--N-9
-R-1
--S-2
- S-2
--S-10
-- S-13'
-S-15
~-X-25
J-2_0
Rece ! ved
DaCe
Static 07/01/86 GO
BH Pressure data 06/19/86 GO
PBU 06/18/86 GO
Static 06/20/86 Camco
Static 07/03/86 GO
Static 07/05/86 Camco
Static 06/21/86 Camco
Static 06/24/86 Camco
Static 07/01/86 Camco
Static 07/01/86 Camco
Static 06/07/86 Camco
Static 06/16/86 Camco
Static ~ 06/20/86 Camco
Static 07/0g/86 Camco
Static 07/06/86 Camco
Static 07/03/86 Camco
Static 07/07/86 Camco
BHPD & PBU 07/05/86 GO
BHPD & PBU 06/23/86 GO
BHPD & Flow test & PBU 06/15/86
GO
Victoria Aldridge LR2-1
I NFORMAT I ON COf~TROL
Wel I Records LR2-1
Standard Ale
Pro<Juction C .y
900 East Ben$o,. -oulevord
P_O. Box 196612
Anchorage. Alaska 99519-6612
(907) 564-5 I I 1
INDEXED
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MARATHON
MOBIL
PHILLIPS
GEOSCIENCES
REFERENCE:
SAPC FINAL DATA
~"i'AN DARD
ALASKA PRODUCTION
Date: 06/13/86
T~: 77113
The followlng material Is being submi~red herewlth. Please acknowledge recelpt by
slgnlng a copy of thls letter and retuAnlng It to this offlce:
Y-20 TELECOMWD Gamma 8700-8990 5" 05/24/86
Y-20 TELECOMWD Gamma 11850-13865 2" 05/24/86
Y-20 TELECOM~D Gamma 11850-13866 5" 05/24/86
Rece I ved
Date
Victoria Aldridge LR2-1
I NFORHAT I ON CONTROL
Wel I Records IR2-1
900 Eo~ Ik,~,o~ ~c d
Ar, cho~oge. A~osko
1907) 56~-51 i !
INDEXED
DAJ~LAS
ARCO
CHEVRON
EPCXON
TEXACO
lo:
MAP, ATHON
MOBIL
PHILLIPS
=
STATE OF
GEOSCIENCES
REFERENCE:
b~I'ANDARD
ALASKA PRODUCTION
Date: 06/10/86
TI: 77105
TELECO MAGNETIC DIRECTIONAL SURVEY(S)
The following m~terlai Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter end returning It to this office:
H-21
H-22
Y-20
Y-20
Y-20
Teleco Survey Job #496
Teleco Survey Job #500
Teleco Survey Job #495
MWD & Single Shot
GCT Job # 71557
05/12/86 To AOGCC 06/13/86
05/28/86 To AOGCC 07/02/86
05/28/86
05/27/86
06/08/86
Aiaska Oil & Gas Cons. Commission
Anchorage
Rece I ved
Victoria Aldridge LR2-i
~NFCRHAI ~ ON C(~IROL
We~ ~ Records tR2-~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION CG,v, MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL l~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Standard Alaska Production Company 86-84
3. Address 8. AP~ Number
P. O. Box 196612 Anchorage, Alaska 99519-6612 50-029-21587
4. Location of well at surface 9. Unit or Lease Name
'~-~-'~'--'~-~- Prudhoe Bay Unit
1440' SNL, 347' WEL, Sec. 33, TllN, R13E, UM
At Top Producing Interval I'!VE'"~IFIED 10. Well Number
1900'
SNL, 1075' WEL, Sec. 5, T10N, R13E, UM iSurf.~
Y-20 (33-5-10-13)
PBU
At Total Depth~-- L.~_~/~'H'-.'-"'~ 11.F ield and Pool
Prudhoe Bay Field
2727' SNL, 1936' WEL, Sec. 5, T10N, R13E, UM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool
89.03' KBE I ADL 28289
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ l-VD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
13866'MD 9011'TVD 13866'MD 9011'TVD YESJ~ NO[]I 2164feetMD 1990'
22. Type Electric or Other Logs Run
Teleco MWD Gamma
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface I10' 8 cu. yds concrete
13-3/8" 72# L-80 Surface 3095' 17½" 4389 cu. ' .ft. Permaf]:ost cement
9-5/8" 47~ L-80NSCC Surface 5395' 12%"
9-5/8" 47~ L-80 Butl 9395' 12656' 12%" 920 cu. 'fL-. Class G~r/i%CFR +.08% HR7
4%" 13.6# iABFL-4S 12430' 13866' 8~'' Slotted, uncemented
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4~" 12 6# 12430 ' MD 12430 'MD
Slotted Liner: '
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Interval: i2659' to 13822'
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
52 slots per foot 13-3/8" x 9-5/8' Annulus; D.ownsqueeze annulus
with 300 sx. Permafrost
slot size is 1/8" X 2" C.p_mp_n'l-_ fn]]~w~d by
27. PRODUCTION TEST
,, --
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD II~
FIowTubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~'
.
28. CUR E DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
R£C£1V£D
J U k 0 9 1986
N~horag~
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. " 30.
·
GEOLOGIC MARKERs FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag 12210' 8890 '
.
Shublik A 12320' 8921'
Zone 4 12670' 8984'
(Top Ivishak/ Sa(lerochit)
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Division
3/~~/ ~ Drilling
~(O Signed ' ~-~ .~/~_.~¢~ Title Engineer Date
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Sohio Daily Drilling Report -- PBU
April 29, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
Current Opera ti on:
0600 Depth: 1545'
Day: 1
24-Hour Ftg: 1437.'
Water Used: 1500
Trip for bit.
Directional Drilling 17-1/2" hole at 1545'.
MUD TYPE-Spud WT'8.9 VIS'205 PV'20 YP:48 FL'20 SOLIDS'5 TEMP'54°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
1 633 4.7 533.1 Ig 133 . 1
3 993 15.3 541.7W 987 .11
5 1353 27.5 541.7 1333 .82
S4' W2 3.7
S52 W39 3.1
S140 Wll9 2.0
0576H:
Sohio Daily Drilling Report -- PBU
April 30, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
·
0600 Depth' 2726'
Day' 2
24-Hour Ftg' 1181'
Water Used' 2800
Current Opera ti on- POH.
RIH and Dyna-drill surface hole to 2286' MD. PON change bit.
RIH and Dynadrill to 2726'. POH.
MUD TYPE-Spud WT'8.9 VIS'186 PV'20 YP-56 FL'12.6 SOLIDS'6 TEMP'48°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
5 1359 22j5 S41JTW 1333 182 140 ll9
7 1729 29j4 S45j2W 1666 343 256 232
9 2107 38jl S42j8W 1980 552 407 376
ll 2485 42~8 S44j2W 2268 796 585 544
12 2656 45~ 4 S43~ 5W 2390 915 671 626
DLS
2.0
2.0
2.3
1.3
1.3
0576H'
Sohio Daily Drilling Report -- PBU
May l, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 3112'
Day: 3
24-Hour Ftg: 386'
Water Used: 800
Current Operation: N/U BOPE.
RIH$ Drill to 3112'. Short trip. CBU. POH. Rig up and run
13-3/8" casing to 3095' Mix and pump 4641 sacks Permafrost
cement' Land casing. ~/U BOP's.
MUD TYPE-Spud WT:8~9 VIS:145 PV:20 YP:52 FL:12.4 SOLIDS:5.5 TEMP:°F
!
SURVEY MD ANGLE DIRECTION TVD SECTION COORD! NATES
DLS
13 2861 4658 S4559W 2533 1063 778 737
14 3051 4654 S46:6W 2663 1200 872 830
1.1
0.3
0576H:
Rig- AUDI #2
Well- Y-20 (33-05-10-13)
Sohio Daily Drilling Report -- PBU
May 2, 1986 at 0600 hours
AFE # 120472
0600 Depth' 3320'
Day: 4
24-Hour Ftg' 216'
Water Used' 1600
Current Operation- RIH.
N/U and test BOPE. P~ck up 12-1/4" BHA and RIH. Test casing to
3000 psi. Dr~ll out cement, float equipment and lO' new hole.
Perform F.I.T. to 12.4 ppg EMW. POH change BHA.
MUD TYPE- WT-8.8 VIS:31 PV'5 YP:5 FL'21 SOLIDS:6 TEMP' N/A°F
?.
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
15 3281 47.7 S42.8W 2820 1368 991 949
0576H'
DLS
1.3
Sohio Daily Drilling Report -- PBU
May 3, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 5746'
Day: 5
24-Hour Ftg: 2418'
Water Used: 800
Current Operation: Drilling.
Drill to'4776'. Trip for bit and BHA. Drilling at 5746'.
MUD TYPE-LSND WT:9.4 VIS:35 PV:5 YP:9 FL:22 SOLIDS:8.5 TEMP:68°F
SURVEY MD ANGLE DIRECTION TVD SECTIO~
COORDINATES DLS
16 3676 47.1 S42.8W 3087 1658
17 4149 46.1 S44.9W 3412 2000
18 4619 44.1 S45W 3744 2333
19 5182 43.1 S46.6W 41 51 2721
20 5655 47.5 S51 . 2W 4484 3057
1205 1146 O. 6
1453 1384 O. 4
1687 1621 0.4
1955 1901 O. 2
2175 2155 1.1
0576H:
Sohio Daily Drilling Report -- PBU
May 4, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 133-05-10-13)
AFE # 120472
0600 Depth: 6282'
Day: 6
24-Hour Ftg: 536'
Water Used: 600
Current Operation: RIH.
Drill to 5764' Trip for BHA. Dyna:~drill to 5896' Trip for
BHA. Ream Dyn~drill run. Drill to 6282'. Trip fo~ bit and BHA.
MUD TYPE-DISP WT:9.4 VIS:34 PV:7 YP:6 FL:12.2 SOLIDS:8 TEMP:72°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
21 5894 47.3 S42.8W 4646 3233 2295 2284 2.7
22 6222 49.7 S43.1W 4863 3477 2475 2451 0.7
0576H:
Sohio Daily Drilling Report -- PBU
~.lay 5, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 7208'
Day: 7
24-Hour Ftg: 926'
Water Used: 600
Current Operation: POH for BHA.
RIH and drill to 6694'. Trip for BHA. Drill to 7208'. POH for
bit.
MUD TYPE-DISP WT:9.5 VIS:43 PV:IO YP:IO FL:8.4 SOLIDS:8.2 TEMP:72°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
23 6448 49 S45.6W 5011 3648 2597 2571
24 6665 47.4 S47.7W 5155 3810 2708 2689
25 6984 46.2 S48W 5374 4042 2864 2861
0.9
1.0
0.3
0576H:
Sohio Daily Drilling Report -- PBU
May 6, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 133-05-10-13)
AFE # 120472
0600 Depth: 8450'
Day: 8
24-Hour Ft§: 1842'
Water Used: 800
Current Operation: Drill ing.
Drill to 7987. Trip for bit and BHA. Drilling at 8450'.
MUD TYPE-DISP WT:9.5 VIS:40 PV:12 YP:12 FL:6.0 SOLIDS:9 TEMP:69°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
26 7357 44.5 S45.6,~ 5636 4388
27 7640 44.4 S45.9W 5838 4506
28 7922 43.2 S46.2W 6041 4701
29 8207 43.8 S46.6W 6248 4897
3046 3055 O. 6
3184 31 97 O. 1
3320 3337 0.4
3455 3479 O. 1
0576H:
Rig: AUDI #2
Well: Y-20 {33-05-10-13)
Sohio Daily Drilling Report -- PBU
May 7, 1986 at 0600 hours
AFE # 120472
0600 Depth: 9735'
Day: 9
24-Hour Ftg: 1285'
Water Used: 1400
Current Operation' Drilling.
Drill to 8830'. Trip for bit. Drilling at 9735'.
MUD TYPE-DISP WT:9.5 VIS:43 PV:12 YP:14 FL:6 SOLIDS:9 TEMP:76°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDI)~ATES
30 8586 44.4 S48.7W 6520 5160 3630 3676
31 9059 44.3 S51.2W 6859 549l 3846 3926
32 9343 44 S50.5W 7062 5689 3772 4079
0576H:
DLS
j3
j4
j2
Sohio Daily Drilling Report -- PBU
May 8, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 133-05-10-13)
AFE # 120472
0600 Depth: 10130'
Day: 10
24-Hour Ftg: 395'
Water Used: 1300
Current Operation: RIH w/ Bit #18.
Trip for BHA. Dynadrilled from 9860 to 10,130'. Trip for BHA.
MUD TYPE-DISP WT:9.6
VIS:42 PV:IO YP:13 FL:5.2 SOLIDS:9 TEMP:88°F
I
SURVEY MD' ANGLE DIRECTION
TVD SECTION
COORDINATES DLS
33 9711 42.1 S51.9W
34 9981 41 S52.2W
7331
7533
5940
6118
4129
4239
4275 .6
4416 .4
0576H:
Sohio Daily Drilling Report -- PBU
May 9, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 {33-05-10-13)
AFE # 120472
0600 Depth: 10950'
Day: ll
24-Hour Ftg: 820'
Water Used: 1200
Current Operation: Drilling ~ 10950 Bit #19
Ream Dynadrill run. Drill to 10475'~ Trip for BHA. Drilling
at 10950'.
MUD TYPE-DISP WT:gj8 VIS:43 PV:IO YP:ll FL:5.4 SOLIDS:9.5 TEMP:80°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
35 10187 43 S49.4W 7686 6256 4326 4523
36 10272 45.4 S50.8W 7747 6315 4364 4569
37 10368 48.7 S50.8W 7812 6385 4409 4623
38 lO510 52.9 S52.9W 7902 6495 4477 4704
DLS
1.3
3.0
3.4
3.1
0576H:
Sohio Daily Drilling Report -- PBU
May 10, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth' 11,459'
Day- 12
24-Hour Ftg' 509'
Water Used' llO0
Current Operation: Drilling with Bit //20
Drill to 11,209" Trip for BHA. Test BOPE. Drilling at
11,459'.
MUD TYPE-Dispersed WT:9.8 VIS:43 PV'll YP'8 FL'5.2 SOLIDS'12 TEMP-82°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
40 11102 54.1 S54. OW 8251 6971 4760 5095
41 11295 53.7 S56.5W 8365 7126 4849 5223
0576H'
.1
1.0
Sohio Daily Drillin9 Report -- PBU
~.~ay l l, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 11,647'
Day: 13
24-Hour Ftg: 188'
Water Used: llO0
Current Operation: Dynadrilling.
Drill to 11580'. Trip for BHA. Dynadrilled to 11647'.
MUD TYPE-Dispersed WT:9.9 VIS:42 PV:ll YP:IO FL:5.2 SOLIDS:Il TEMP:78°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
42 11512 53 S57.5W 8494 7298 4944 5369 .5
0576H:
Sohio Daily ~rilling Report -- PBU
May 12, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12,109'
Day: 14
24-Hour Ftg: 462'
Water Used' 800
Current Operation: Drilling.
Dynadrilled to 11775' Trip for bit and BHA. Ream 11258 to
11647'. Drilling at i2109'.
MUD TYPE-Dispersed WT'IO. 1 VIS-45 PV:13 YP-11 FL'4.8 SOLIDS'I 2 TEMP:92°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
43 11113 48.5 S50.8W 8622 1452 5035 5495 3.4
44 11867 53.4 S48W 87l 9 7572 5l ] 3 5586 3.5
45 11960 58.2 S49W 8771 7648 5163 5643 5.0
46 12056 63.2 S49.4W 8818 7732 5218 5707
0576H:
Sohio Daily Drilling Report -- PBU
May 13, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12294'
Day: 15
24-Hour Ftg: 185'
Water Used: 800
Current Operation: RIH. Reaming to BTM.
Drill to 12294'. Circulate high vis sweep. Trip for BHA.
Reaming from 11883 to bottom.
MUD TYPE-Dispersed WT:IO.2 VIS:49 PV'I 7 YP:IO FL:4 SOLIDS'I 2 TEMP'88°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDI)~TES
·
DLS
46 12056 63.2 S49.4W
47 12151 68.4 S49.4W
48 12244 73.4 S49.4W
8818 7732 5218 5707 5.2
8857 7819 5274 5773 5.4
8886 7907 533l 5939 5.4
0576H:
Sohio Daily Drilling Report -- PBU
May 14, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12417'
Day: 16
24-Hou r Ftg: 123'
Water Used: 600
Current Operation: R.I.H.
Ream from 11883 to 12294. Drill to 12412'. Short trip. Drill
to 12417'. Trip for bit and BHA.
MUD TYPE-Dispersed WT:10 VIS :47 PV:15 YP:12 FL:3.8 SOLIDS :13 TEMP: 96°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
49 12332 76.8 S49.7W 8909 7992 5386 5904
DLS
3.4
0576H:
Sohio Daily Drilling Report -- PBU
May 15, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12534'
Day: 17
24-Hour Ftg: ll7'
Water Used: 400
Current Operation: R.I.H. w/fishinE) tools.
Drilled to 12534. Lost 400 psi pump pressure. POH. Found wash
out and twist off in HWDP. Left 949' fish in hole. RIH with
fishing tools.
MUD TYPE-Dispersed WT:IO. 1 VIS:54 PV:21
YP:17 FL:3.8 SOLIDS:13 TEMP:N/A°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
50 12368 77.6 S49.1W 8916 801 7 5403 5923 5.0
51 12427 79.4 S49.8W 8928 8085 5447 5975 2.8
52 12490 80.7 S49.1W 8939 8148 6487 6022 2.3
0576H:
Sohio Daily Drilling Report -- PBU
~-4ay 16, 1986 at 0600 hours
Rig' AUDI #2
Well- Y-20 (33-05-10-13)
AFE # 120472
0600 Depth' 12550'
Day' 18
24-Hour Ftg' 36'
Water Used: 4.00
Current Operation- Drilling
RIH with fishing string and recovered fish. RIH with new BHA
and reamed from 11600' to 12.~34'. Drilling at 12550'.
MUD TYPE-Dispersed ~T:lO.2 VIS:49 PV-20 YP-16 FL'3.8 SOLIDS'13.5 TEMP:88°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
0576H-
Sohio Daily [lrill~ng Report -- PI~U
Hay 17, 1986 at 0600 hours
Rig' AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12656'
Day: 19
24-Hour Ftg: 107'
Water Used: 1200
Current Operation: P.O.H. for Casing.
Drilled to 12-1/4" TD at 12656'. Short trip. CBU. POH.
MUD TYPE-Dispersed WT:IO VIS:47 PV:18 YP:12 FL:4 SOLIDS:13 TEMP:IOO°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
53 12585 80.8 S48.4~ 8954 8240 5549 6092 0.7
54 12620 80.7 S48.7W 8960 8275 5572 6118 0.9
0576H:
Sohio Daily Drilling Report -- PBU
~lay 18, 1986 at 0600 'hours
Rig: AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12656'
Day: 20
24-Hour Ftg: O'
Water Used: 500
Current Operation: Pick up HWDP.
Ran 9-5/8" casing to 12646 and cemented with 872 cu. ft. Class
G. Installed and tested packoff. Test BOPE. PU 8-1/2'° BHA.
MUD TYPE-Dispersed WT:IO VIS:52 PV:19 YP:13 FL:4 SOLIDS:13 TEMP:88°F
SURVEY MD A~GLE DIRECTION TVD SECTION COORDINATES DLS
0576H:
Sohio Daily Drilling Report -- PBU
May 19, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 12656'
Day: 21
24-Hour Ftg: '
Water Used: 800
Current Operation: Displace with oil base mud.
RIH to FC. Test casing to 3000 psi. Unable to rotate. Clean
pits. Take on oil base mud. Displacing hole with oil base mud.
MUD TYPE-Oil base WT:9 VIS: PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
0576H:
Sohio Daily Drilling Report -- PBU
May 20, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth' 12981'
Day' 22
24-Hour Ftg' 325'
Water Used' 400
Current Operation' Change B.H.A.
Displace hole with oil base mud. Drill FC, cement and FS.
Drill to 12981'. POH for bit and BHA.
MUD TYPE-Drill faze WT:9 VIS-112 PV:30 YP-41 FL-2 SOLIDS:13 TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
55 12676 81.6 S47.7W 8969 8330 5609 6160
56 12772 84.6 S47.3W 8980 8426 5673 6230
57 12865 87.6 S47.7W 8987 8518 5736 6298
58 12923 89.6 S47.3W 8988 8576 5775 6341
59 12960 90.8 S48W 8988 8613 5800 6368
DLS
2.4
3.1
3.2
3.5
3.7
0576H'
Sohio Daily Drilling Report -- PBU
May 21, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 133-05-10-13)
AFE # 120472
0600 Depth: 13394'
Day: 23
24-Hour Ftg: 413'
Water Used: 400
Current Operation- Drillin§.
RIH wi th new BHA. Drilling at 13394'.
MUD TYPE-Drill faze WT-9.0 VIS'lO7 PV-33 YP'47 FL-2 SOLIDS:13 TEMP:98°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDI NATES
59 12960 90.8 S48W 8988 8613 5800 6368
60 13035 9]. l S47.7W 8987 8688 5850 6424
61 13133 91.2 S47.7W 8985 8786 5916 6496
62 13223 91.3 S47W 8982 8876 5977 6566
63 13318 90.4 S47W 8981 8971 6042 6632
DLS
3.7
.6
.1
.8
.9
0576H-
Sohio Daily Prilling Report -- PBU
~lay 22, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13,419'
Day: 24
24-Hour Ftg: 25'
Water Used: 500
Current Operation: Work stuck pipe.
Drilled to 13419'. Trip for bit and BHA. Condition mud at
casing shoe. Ream from 13299' to 13352'. Stuck pipe at
13352'. Working pipe.
MUD TYPE-Drill faze WT:9.0 VIS:ll2 PV:31 YP:44 FL:4 SOLIDS:13 TEMP:86°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
64 13382 90.6 S47W 8987 9032 6083 6677
.3
0576H:
Sokio Daily Drilling Report -- PBU
May 23, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13497'
Day: 25
24-Hour Ftg: 78'
Water Used: 300
Current Operation: Drilling.
Spot pipe lax pill. Work pipe free and POH to shoe. Condition
mud. Ream and wash to 13419'. Drilling at 13497'.
MUD TYPE-Drill faze
TEMP:103°F
WT:9.2 VIS:108 PV:22 YP:52 FL:3.4 SOLIDS :13.5
SURVEY MD ANGLE
DIRECTION TVD SECTION COORDINATES
DLS
65 13449 89.1
S46W 8987 9099 6129 6726 2.7
0576H:
SoHio Daily Drilling Report -- PBU
May 24, 1986 at 0600 hoLlrs
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13,623'
Day: 26
24-Hour Ftg: 126'
Water Used: 200
Current Operation: Drilling with bit #29.
Drilled to 13497'. POH to shoe. Condition mud to 9.3 ppg.
Trip for bit and BHA. Ream 13320' to 13497'. Drillin9 at
13623'.
MUD TYPE-Drill faze WT:7.5 VIS:141 PV:28 YP:54 FL:5.2 SOLIDS:14 TEMP:79°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
66 13481 88.1 S45W 8988 9131 6151 6748 4
67 13551 87.8 S45.6W 8991 9201 6201 6798 .9
0576H:
So~io Daily Drilling Report -- PBU
t-lay 25, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13,866'
Day: 27
24-Hour Ftg: 243'
Water Used: 400
Current Operation: RIH C.O. run.
Drill to 13866'. Back ream tight hole from 13487 to 12646.
Trip for bit and BHA.
MUD TYPE-Drill faze WT'9.7 VIS'l'21 PV:30 YP-54 FL'3.2 SOLIDS'14 TEMP-98°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
68 13647 87.9 S44.2W 8994 9297 6269 6866 1.4
69 13740 88.2 S43.5W 8997 9389 6336 6930 .8
70 13829 88.3 S43.5W 9000 9478 6401 6991 0
0576H:
Rig: AUDI #2
Well: Y-20 /33-05-10-13)
Sohio Daily Drilling Report -- PBIJ
May 26, 1986 at 0600 hours
AFE # 120472
0600 Depth: 13,866'
Day: 28
24-Hour Ftg: O'
Water Used: 300
Current Operation: POH f/liner.
Circulate and condition mud to 9.8 ppg. RIH and ream 12916 to
13702' CBU. Spot Lo-vis pill. POH to shoe. CBU. RIH and
ream 1~172to 13456'. CBU. Spot Lo-vis pill. POH for liner.
MUD TYPE-Drill faze WT:9.8 VIS:124 PV:25 YP:56 FL:3.4 SOLIDS:14 TEMP:84°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
0576H:
Sohio Daily Drilling Report -- PBU
May 27, 1986 at 0600 hours
Rig: AUDI #2
Well' Y-20 (33-05-10-13)
AF£ # 120472
0600 Depth: 13,866'
Day: 29
24-Hour Ftg: '
Water Used: 100
Current Operation: Lay down HWDP.
POH. Ran 4-1/2" slotted liner from 13822' to 12659' and hung
from packer at 12430'. Tested packer to 3000 psi. Displaced
slotted liner to diesel. POH.
MUD TYPE-Drill faze WT:9.8 VIS:134 PV:28 YP:56 FL:3.4 SOLIDS:14 TEMP:80°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDI NATES DLS
0576H:
Sohio Daily Prilling Peport -- PBU
Hay 28, 1986 at 0600 ~ours
Rig: AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13,866'
Day: 30
24-Hour Ftg: '
Water Used: 400
Current Operation: Circ. salt water.
RIH with dummy seal assembly and wash over SBR seal nipple.
Displace hole with 9.1 ppg Na Cl. Inject oil base mud.
MUD TYPE-9.1 WT:9.1 VIS: PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
0576H:
Sohio Daily Drillin.q Report -- PBU
May 29, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 C33-05-10-13)
AFE # 120472
0600 Depth: 13,866'
Day: 31
24-Hour Ftg: '
Water Used: 300
Current Operation: Install adapter flange.
Circulate Na Cl. POH. Ran 4-1/2" tubing. NU tree and adapter
flange.
MUD TYPE-Na C1 WT:9.1 VIS: PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
0576H:
Sohio Daily F)rillin.q Report -- PBU
May 30, 1986 at 0600 hours
Rig' AUDI #2
Well' Y-20 (33-05-10-13)
AFE # 120472
0600 Depth' 13,866'
Day: 32
24-Hour Ftg' '
Water Used' 100
Current Operation- Wire lining.
NU tree and test to 5000 psi. RU wi reline and attempt to set
plug in X nipple. Lost prong. Running XX plug to set in X
nipple.
MUD TYPE-None WT' VIS' PV- YP' FL' SOLIDS: TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
DLS
0576H:
Sohio Daily Drilling Report -- PBU
May 31, 1986 at 0600 hours
Rig: AUDI #2
Well: Y-20 (33-05-10-13)
AFE # 120472
0600 Depth: 13,866'
Day: 33
24-Hour Ftg: O'
Water Used: 200
Current Operation- Pump A/P - Rig released 0600.
Set XX plug. Opened sliding sleeve. Displaced tubing to
diesel. Closed sleeve. Pulled plug. Installed SSSV.
Downsqueezed annulus with 300 sks Permafrost C followed by 125
bbls Arctic pack. Released rig at 0600 hrs. 5/31/86.
MUD TYPE- WT: VIS: PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD- SECTION COORDINATES
DLS
0576H:
SUB-SURFACE
DIRECTIONAL
SURVEY
~'~ UIDANCE
~'~ONTINUOUS
~-~'] OOL
Company
Well Name
Field/Location
STANDARD ALASKA PRODUCTION COMPANY
Y-20(1440'SNL.347'WEL.SEC.33,TllN,R13E)
pR[]DROR RAY. NQRTR RT,gDR. ALASKA
Job Reference No.
71557
Lo~3ed By:
HAUGAARD
Date
,
6/8/86
Computed By;
KRUWELL
GOT DIRECTIONAL SURVEY
CUSTOMER LISTING
STANDARD ALASKA PRODUCTION CO.
Y-Z0 (33-5-10-13)
PRUDm~E BAY
NORTH SLOPE,ALASKA
SURVEY DATE: 08-JUN-B6
ENGINEER: L. HAUGAARO
METHODS OF CSMPUTATISN
TOOL LOCATION: TANGENTIAL- &VERAGED DEVIATION AND AZIMUTH
INTERPOL&TI~N: LINEA~
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 48 DEG 0 MIN WEST
DATA FROM SURF.6CE TC 1ILO7' 4C~UIRED WiTH TANGENTIAL METHOD FROM SCHLUMBERGER GCT TOOL.
DATA FROM 12107' TS gRILLERS TO 13366' &C~UIREO WITH RADIUS OF CURVATURE METHOD FROM
TELECO MEASURED WHIL~ ORILLING SURVEY. MWD DATA TIED TO GCT DATA AT DEPTH 12066'.
COMPUTATION DATE: 30-JUN-86 PAGE
STANDARD ALASKA PRODUCTION CO..
Y-20 (33-5-10-13)
PRUDHOE BAY
NORTH SLOPE,ALASKA
INTERPOLATED VALUES FOR EVEN 100 FEET OF
TRUE
MEASURED VERTICAL
DEPTH DEPTH
SUB-SEA
VERTICAL
DEPTH
COURSE VERTICAL DOGLEG
DEVIATION AZIMUTH SECTION SEVERITY
DEG MIN DEG MIN FEET OEO/lO0,
0.00 0.00 -89.03
100.00 100.00 10.97
200.00 200.00 110.97
300.00 300.00 210.97
400.00 400.00 310.97
500.00 499.99 410.96
600.00 599.89 510.86
700.00 699.57 610.54
800.00 798.67 709.64
900.00 896.95 807.92
0
1
3
5
9
12
0 0 N 0 0 E 0.00 0.00
0 18 S 29 54 E 0.10 0.23
0 4 S 80 28 E 0.02 0.38
0 19 S 19 29 W 0.26 0.82
15 S 27 58 W 0.50 1.04
20 S 13 29 W 1.49 0.93
31 S 22 47 W 5.09 2.12
56 S 29 38 W 12.53 2.29
7 S 37 3 W 25.39 3.97
7 S 38 40 W 43.58 2.61
1000.00 994.15
1100.00 1090.24
1200.00 1185.39
1300.00 1279.35
1400.00 1371.95
1500.00 1463.19
1600.00 1553.10
1700.00 1641.67
1800.00 1728.48
1900.00 1813,20
905.13
1001.21
1096.36
1190.32
1282.92
1374.16
1464.07
1552.64
1639.45
1724.17
14 54 S 39 16 N 66,69 2.68
17 2 S 40 42 W 94.08 2.26
18 53 S 41 26 W 124.66 1.89
21 2 S 40 39 W 158,61 2.2'9
23 14 S 40 4 W 196.01 2,08
24 57 S 42 11 W 236.60 2.13
26 52 S 43 34 W 280,20 1.77
28 31 S 43 43 W 326.50 2.07
30 53 S 43 5 ~ 375,97 2.43
33 14 S 41 47 W 428.82 2.49
2000.00 1895.67
2100.00 1975.67
2200.00 2053.72
2300.00 2130.06
2400.00 2205.43
2500.00 2279.45
2600.00 2351.54
2700.00 2421.93
2800.00 2491.50
2900.00 2561.23
1806.54
1886.64
1964.69
2041.05
2116.40
2190.42
2262.51
2332.90
2402.77
2472.20
35 3'9 S 40 30 W 484.94 2.97
37 42 S 40 20 W 544.41 1.40
39 36 S ~1 5 W 606.39 1.75
40 41 S 40 33 W 670.50 1.54
41 29 S 39 51 N 735.59 1.06
43 9 S 41 23 W 802.26 2.01
44 34 S 41 33 W 871.13 1.73
45 3~ S 42 9 W 941.72 1.85
45 4.2 S 43 25 W 1012.99 0.46
46 10 S 43 36 W 1094.75 0.53
3000.00 2630.63
3100.00 2700.49
3200.00 2770.39
3300.00 2838.99
3400.00 2'306.75
3500,00 2974.42
3600.00 3042.34
3700.00 3110.09
3800.00 3177.79
3900.00 3246.14
2541.60
2611.46
2681.36
2749.96
2817.72
2885.39
2953.31
3021.06
3088.76
3157.11
45 50 S 43 50 W 1156.53 0.33
45 22 S 43 17 W 1227.89 0,65
46 4 S 42 39 ~ 12'39.11 1,26
47 12 S 42 14 W 1371,52 0.85
47 22 S 42 9 W 1444.69 0.27
47 18 S 42 24 W 1517.94 0.81
47 18 S 42 35 ~ 1591.01 0,40
47 21 S 42 24 W 1664.22 0.50
47 ,PO S 42 33 W 1737,47 0.76
46 33 S 43 lei W 1810.18 0,77
DATE OF SURVEY: 08-JUN-86
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARD
MEASURED DEPTH
RECTANGULAR
NORTH/SOUTH
FEET
COORDINATES HORIZ.
EAST/WEST DIST.
FEET FEET
0.00 N 0.00 E O.
0.40 S 0.23 E O.
0.56 S 0.48 E O.
0.74 S 0.31 E O.
1.20 S 0.41 E 1.
2.30 S 0.06 E 2.
6.07 S 1.38 W 6.
13.24 S 4.94 W 14.
24.12 S 12.45 W 27.
38.60 S 23.89 W 45.
56.83 S
77.99 S
101.13 S
126.89 S
155.71 S
186.62 S
218.57 S
252.12 S
283.12 S
327.29 S
38.57 W 68.
56.38 W 96.
76.69 W 126.
99.18 W 161.
123.55 W 198.
150.34 W 239.
180.25 W 283.
212.33 W 329'.
246.49 W 379.
282.34 W 432.
369.93
415.67
463.05
511.69
562.06
613.14
664.96
718.03
770.32
822.53
89.03 FT
DEPARTURE
AZIMUTH
OEG MIN
O0 N 0 0 E
46 S 29 48 E
74 S 40 30 E
80 S 22 48 E
26 $ 18 49~
30 S 1 36 '~
23 S 12 47 .w
13 S 20 28 W
14 S 27 18 W'
39 S 31 45 W
68 S 34 10 W
24 S 35 51 W
92 S 37 10 W
05 S 38 0 W
77 S 38 25 W
65 S 38 51 W
31 S 39 30 W
62 S 40 6 W
17 S 40 32 W
24 S 40 46 W
874.53 S 768.83 W 1164.44 S 41 19 W
926.25 S 818.29 W 1235.93 S 41 27 W
978.65 S 866,95 W 1307.42 S 41 32 W
1032.38 S 916.01 W 1380.17 S 41 34 W
1086.87 S 965.41 W 1453.72 S 41 36 W
1141.40 S 1014.88 W 1527.34 S 41 38 W
1195.42 S 1064,56 W 1600.72 S 41 41 W
1249.67 S 1114.23 W 1674.27 S 41 43 W
1304.01 S 1163.86 W 1747.85 S 41 44 W
1357.41 S 1213,62 W 1820.83 S 41 47 W
S 319.47 W 488.78 S 40 48 W
S 358.30 W 548.78 S 40 45 W
S 399.04 W 611.27 S 40 45 W
S 441.52 W 675.85 S 40 47 W
S 483.76 W 741.57 S 40 43 ~
S 527.48 W 808.81 S 40 42
S 573.49 W 878.10 S 40 46 ~.
S 620.69 W 949.12 S 40 50 W
S 669.52 W 1020.61 S 40 59 W
S 719.06 W 1092.52 S 41 9 W
COMPUTATION DATE: 30-JUN-86 PAGE 2
STANDARD ALASKA PRODUCTION CO.
DATE OF SURVEY: 08-JUN-86
Y-Z0 (33-5-10-13)
PRUDMOE SAY
NORTH SLOPE,ALASKA
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARO
INTERPCLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
89.03 FT
DEPTH DEPTH DEPTH DEG MIN
4000.00 3314.98 3225.95 46 27
4100.00 3383.98 3294.95 46 10
4200.00 3453.03 3364.00 46 21
4300.00 3522.22 3433.19 45 49
4400.00 3592.72 3503.69 44 59
4500.00 3663.50 3574.47 44 52
4600.00 3734.68 3645.65 44 18
4700.00 3806.50 3717.47 43 57
4800.00 3878.63 3789.60 43 40
4900,00 3951.05 3862.02 43 36
5000.00 4023.35 3934.32 43 32
5100.00 4095.96 4006.93 43 14
5200.00 4168.86 4079.83 43 14
5300.00 4241.69 4152.66 43 19
5400.00 4314.02 4224.99 44 1
5500.00 4385.55 4296.52 44 41
5600.00 4455.75 4366.72 46 27
5700.00 4523.43 4434.40 4~ 0
5800.00 4590.53 4501.50 47 19
5900.00 4658.52 4569.49 47 25
6000.00 4725.73 4636.70 48 12
6100.00 4791.98 4702.95 48 45
6200.00 4857.46 4768.43 49 26
6300.00 4922.18 4833.15 4~ 25
6400.00 4987.31 4898.28 49 15
6500.00 5053.14 4964.11 48 20
6600.00 5120.10 5031.08 47 42
6700.00 5187.73 5098.70 47 2
6800.00 5256.15 5167.12 46 39
6900.00 5324.96 5235.93 46 24
7000.00 5394.17 5305.14 45 59
7100.00 5464.07 5375.04 45 6
7200.00 5534.82 5445.79 45 2
7300.00 5605.55 5516.52 44 49
7400.00 5676.63 5587.60 44 40
7500.00 5747.82 565~.79 44 35
7600.00 5819.20 5730.17 44 23
7700.00 5890.78 5851.75 44 4
7800.00 5962.84 5573.81 43 45
7900.00 6035.30 5946.27 43 22
DEG MIN FEET DEG/iO0 FEET FEET
S 43 22 W 1882.48
S 43 15 W 1954.62
S 43 13 W 2026.70
S 43 26 W 2098.65
S 44 3 ~ 2169.38
S 43 48 W 2239.84
5 ,44 12 W 2309.90
S 44 36 W 2379.35
S 44 30 W 2448.50
S 44 24 W 2517.32
S 44 41 W 2585.28
S 45 10 ,W 2654.93
S 45 58 W ,2723.32
S 46 36 W 2791.82
S 47 6 N 2860.86
S 47 36 W 2930.74
S 48 56 W 3001.95
S 49 58 W 3075.52
S 46 51 W 3149.64
S 41 39 W 3222.73
S 41 8 W 3296.27
S 41 8 W 3370.63
S 41 15 W 3445.68
S 42 0 W 3521.40
S 43 40 W 3596.98
S 44 31 N 3672.09
S 45 21 W 3746.25
S 45 ~3 W 3819.84
S 45 35 W 3892.71
S 45 23 W 3965.21
S 45 30 W 4037.32
S 45 32 W 4108.75
S 45 26 W 4179.35
S 45 20 W 4249.97
S 45 17 W 4320.24
S 45 17 W 4390.39
S 45 19 W 4460.3~
S 45 20 W 4530.09
S 45 20 W 4599.36
S 45 23 ~ 4668.21
0.43
0.40
0.50
2.05
0.52
0.50
0.77
0.25
0.51
0.55
0.95
0.88
0.71
0.71
0.88
0.96
2,89
0,27
5,52
1.83
1.24
0.85
0.77
1.30
0.83
1.17
0.27
0.49
0.34
0.62
0.38
0.71
0.76
0.76
0.65
0.50
0.29
0.33
0.33
0.51
FEET OEG MIN
1410.13 S 1263.44 W 1893.34 S 41 51 W
1462.78 S 1313.10 W 1965.70 S 41 54 W
1515.49 S 1362.65 W 2038.02 S 4t 57 W
1568.11 S 1412,08 W 2110,20 $ 42 0 W
1619.20 S 1461.26 W 2181.07 S 42 3 "
1670,12 S 1510,23 W 2251,68 S 42 7 ,..
1720.71 S 1558.95 W 2321.88 S 42 10
1'770.32 S 1607.73 W 2391.41 S 42 14 ~
1819,63 S 1656,38 W 2460,62 S 42' 18 W
1868.83 S 1704.69 W 2529.52 S 42 22 W
1'918,07 S 1753,15 W 2598,56 S 42 25 W
1966.85 S 1801.61 W 266T,26 S 42 29 W
2014.70 S 1850,55 W 2735.60 S 42 34 W
2062.04 S 1900.09 W 2803.99 S 42 39 W
2109.24 S 1950,50 W 2872,86 S 42 45 W
2156.54 S 2001.94 W 2942.52 S 42 52 W'
2204.14 S 2054.90 W 3013.44 S 42 59 W
2251.75 S 2111.04 W 3086.56 S 43 9 W
2300.16 S 2167.18 W 3160.28 S 43 17 W
2353.05 S 2217.92 W 3233,58 S 43 18 W
2408.76 S 2266.72 W 3307.59 S 43 15 W
2465.20 S 2315.95 W 3382.43 S 43 12 W
2522.08 S 2365.73 W 3457.97 S 43 10 W
2579.25 S 2416.14 W 3534.16 S 43 T W
2634.81 S 2467.82 W 3610.04 S 43 7 W
2688.86 S 2520.22 W 3685.31 S 43 8 ~
2741.40 S 2572.71 W 3759.53 S 43 10 ~
2792.97 S 2625.31 W 3833.13 S 43 13 W
2843.93 S 2677.47 W 3906.00 S 43 16 W
2894.81 S 2729.22 W 3978.51 S 43 18 W
2945.44 S 2780.66 W 4050.64 S 43 21 W
2995.53 S 2831.69 W 4122.09 S 43 23 W
3045.05 S 2882.09 W 4192.71 S 43 25 W
3094.68 S 2932.44 W 4263.36 S 43 27 W
3144,15 S 2982.45 W 4333.67 S 43 29 W
3193.56 S 3032.36 W 4403.87 S 43 31 W
3242.80 S 3082.15 W 4473.86 S 43 32 W
3291.88 S 3131.82 W 4543.65 S 43 34 W
3340.62 S 3181.14 W 4612.96 S 43 35 W
3389.04 S 3230.18 W 4681.85 S 43 37 W
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH
STANDARD ALASKA PRODUCTION CO.
Y-20 (33-5-10-13)
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 30-JUN-86
PAGE
DATE DF SURVEY: 08-JUN-86
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARD
TRUE
MEASUREO VERTICAL VERTICAL DEVIATION AZIMUTH
D;PTH OEPTH DEPTH DEG MIN DEG MZN
89.03 FT
9000.00 6825.36 6736.33 44 23
9100.00 6897.04 6808.02 44 3
9200.00 6968.79 6879.76 44 14
9300.00 7040.37 6951.34 44 25
9400.00 7111.95 7022.92 44' 6
9500.00 7183.99 7094.96 43 35
9600.00 7257.03 7168.00 43 1
9700.00 7330.45 7241.42 42 18
9800.00 7404.93 7315.90 41 32
9900.00 7480.44 7391.41 40 29
10000.00 7556.17 7467.14 41 2
10100.00 7631.4'9 7542.45 41 29
10200.00 7705.42 7616.39 43 19
10300.00 7776.70 7687.67 45 ~8
10400.00 7844.20 7755.17 q9 2,5
10500.00 7906.79 7817.76 52 38
10600.00 7966.88 7877.35 53 20
10700.00 8026.14 7937.11 55 55
10800.00 8084.91 7995.83 54 6
10900.00 8143.52 8054.49 53 59
11000.00 8201.99 8112.95 54 34
11100.00 8260.03 8171.00 54 28
11200.00 8318.40 8229.37 54 9
11300.00 8377.05 8288.02 53 52
11400.00 8436.54 8347.51 53 23
11500.00 8495.92 8406.89 53 39
11600.00 8555.57 8466.54 51 50
11700.00 8620.10 8531.07 48 53
11800.00 8686.34 8597.31 49 19
11900.00 8748.17 3559.14 54 21
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST.
FEET DEG/IO0
S 45 16 W 4736.66
S 45 21 W 4805.53
S 45 35 W 4874.70
S 45 53 W 4'944.10
S 46 16 W 5014,04
S 46 45 W 5084.44
S 47 16 W 515~.50
S 47 56 W 5224.19
S 48 42 W 5293.74
S 48 47 W 5363.24
S ~8 45 W 5433.17
S 48 43 W 5502.89
S 48 41 W 5572.54
S 49 0 W 5542.38
S 49 29 W 5712.19
S 49 58 W 5781.51
S 50 39 W 5849.76
S 51 13 W 5917.56
S 51 26 W 5984.17
S 51 24 W 6049.60
S 50 54 W 6114.80
S 48 30 W 6180.55
S 49 2 N 6247.87
S 49 25 W 6317.98
S 5C, 5 W 6391.71
S 50 48 W 6469.59
$ 51 9 W 6549.43
$ 51 32 W 6629.33
S 51 51 W 6710.56
S 51 55 W 6791.42
S 52 9 W 6872.33
S 52 49 W 6953.51
S 53 42 w 7034.37
S 5~ 16 W 7114.91
S 54 49 W 7194.77
S 55 16 W 7274.61
S c5 40 W 7354.20
S 51 45 W 7430.07
S 46 44 W 7504.95
S 46 ~1W 7583.47
MOT H
0.66
0.52
0.30
1.09
1.02
0.73
0.89
0.58
0.72
0.38
0.20
0.5!
0.29
0.50
0.72
2.73
0.35
1.24
0.95
0.73
1.34
1.63
2.63
2.96
3.99
1.64
0.67
0.42
0.17
1.I1
0.36
0.86
0.98
0.62
0.9~
0.25
6.50
5.26
3.97
4.79
FEET FEET FEET DEG MIN
3437.21 S 3278.93 W ~+750.34 S 43 38 W
3485.70 S 3327.94 W 4819.26 S 43 40 W
3534.28 S 3377.28 W 4888,47 S 43 41 W
3582.73 S 342'7.04 W 4957.88 S 43 43 W
3631.27 S 3477.45 W 5027.80 S 43 45 "
3679.74 $ 3528.54 W 5098.15 $ 43 47
3727.51 S 3579.79 W 5168.10 S' 43 50
3774.54 S 3631.22 W 5237.65 S 43 53
3820.79 S 3683.17 W 5306,99 S 43 56 W
3866.59 $ 3735.46 W 5376.26 S 44 0 W
3912.67 S 3788.07 W 5445.96 S 44 4 W
3958.64 S 3840.49 W 5515.45 S 44 7 W
4004.61 S 3892.84 W 5584.89 S 44 11
4050.58 S 3945.41 W 5654.51 S 44 14 W
4096.17 S 3998.30 W 5724.07 S 44 18 W
4141.06 S 4051.17 W 5793,13 S 44 22 W
4184.63 S 4103.77 W 5861.07 S 44 26 W
4227,40 S 4156.50 W 5928.52 S 44 30 W
4269.09 S 4208.59 W 5994.78 S 44 35 W
4309,88 S 4259.91 W 6059,86 S 44 39 W
4350.73 S 4310.86 W 6124.74 S 44 44 W
4393.39 S 4360.92 W 6190.28 S 44 47 W
4437.85 S 4411.49 W 6257.45 $ 44 49
4483.63 S 4464.61 W 6327.37 $ 44 52 W
4531.30 S 4520.89 W 6400.87 S 44 56
4580.85 S 4581.08 W 6478.46 S 45 0 "
4631.16 S 4643.20 W 6557,97 S 45 4
4681.45 S 4706.12 W 6638.04 S 45 9
4731.55 S 4769.64 W 6718.41 S 45 13 W
4781.57 S 4833.41 W 6798.92 S 45 18 W
4831.47 S 4897.35 W 6879.47 S 45 23 W
4881.08 S 4961.93 W 6960.29 S 45 28 W
4929.68 S 5026.98 W 7040.76 S 45 33 W
4977.21 S 5092.56 W 7120.87 S 45 39 W
5023.83 S 5158.04 W 7200.29 S 45 45
5069.90 S 5224.00 W 7279.70 S 45 51 W
5115.47 S 5290.06 W 7358.86 S 45 57 W
5159.81 S 5352.23 W 7434.38 S 46 2 W
5209.32 S 5408.42 W 7509.19 S 46 4
5263.29 S 5465.48 W 7587.73 S 46 4 W
8000.00 6108.12 6019.09 43 25
8100.00 6180.55 6091.32 43 44
8200.00 6252.70 6163.67 43 58
8300.00 6324.65 6233.62 44 7
8400.00 6396.08 6307.05 44 39
8500.00 6467.08 6378.05 44 37
8600.00 6538.44 6449.41 44 18
8700.00 6610.15 6521.12 4~ 9
8800.00 6682.00 6592.97 43 50
8900.00 6753.89 6664.~6 44 18
INTERPOLAT'=D VALUES F3R EVEN 100 FEET OF MEASURED DEPTH
SUB-SEA COURSE VERTIC~.L DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
COMPUTATZON DATE: 30-JUN-86 PAGE 4
STANDARD ALASKA PRODUCTION CO.
DATE OF SURVEY: 08-JUN-86
Y-20 (33-5-10-13)
PRUDHOE BAY
NORTH SLOPE~ALASKA
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARD
89.03 FT
INTERPOLATED VALUES FSR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZZMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
12000.00 8802.96 8713.93 59 20
12100.00 8850.03 6761.00 64 53
12107.00 8853.01 8763.98 65 25
S 47 4 W '7667.05
S 47 35 W 7755.24
S 47 34 W 7761.58
5.~5
6.01
0.00
5320.43 S 5526.50 W 7671.32 S 46 5 W
5380.15 S 5591.40 W 7759.49 S 46 6 W
5384.42 S 5596.08 W 7765.83 S 46 6 W
12200.00 8886.70 8797.67 TO 30
12300.00 8916.20 8827.17 75 12
12400.00 8939.20 8850.17 78 24
12500.00 8957.40 8868.37 80 42
12600.00 8973.50 8884.47 80 48
12700.00 8988.30 8899.27 82 t4
12800.00 8998.80 8909.77 85 30
12900.00 9004.10 ~915.07 88 48
13000.00 9003.90 8914.87 91 O0
13100.00 9002.00 8912.97 91 12
13200.00 8999.90 8910.87 91 1,2
13300.00 8998.20 8909.17 90 36
13400.00 8997.50 8908.47 90 12
13500.00 8999.00 8909.97 58 O0
13600.00 9002.70 8913.67 87 54
13700.00 9006.30 8917.27 85 06
13800.00 9009.50 8920.47 88 12
13866.00 9011.50 8922.47 88 1Z
S 49 30 W
S 49 30 W
S 49 24 W
S 49 06 W
S 48 24 W
S 47 36 w
S 47 24 W
S 47 30 W
S 47 06 W
S 46 48 w
S 47 O0 W
S 47' O0 W
S 46 42 W
S 45 12 W
S 44 54 W
S 43 48 W
S 43 30 W
S 43 30 ~
5440.20 S 5661.00 W 7851.20
5502.10 S 5733.60 W 7946.50
5565.40 S 5807.50 W 8043.70
5629.30 S 5882.20 W 8141.80
5694.40 S 5956.40 W 8240.40
5760.40 S 6030.10 W 8339.30
6301.30 S 6610.40 W 9132.50
6402.40 S 6711.70 W 9275.70
6398.10 S 6707.40 W 9269.50
6362.50 S 6671.90 W 9219.30
6321.70 S 6631.00 W 9161.50
6288.20 S 6597.10 W 9113.80
6235.80 S 6542.50 W 9038.20
6305.40 S 6614.50 W 9138.30
6375.90 S 6685.20 W 9238.20
6447.40 S 6755.10 W 9338.10
6519.70 S 6824.10 W 9437.90
6567.50 S 6869.40 W 9503.90
COMPUTATION OATE: 30-JUN-86 PAGE 5
STANDARD ALASKA PRODUCTION CO.
DATE OF SURVEY: 08-JUN-86
Y-Z0 (33-5-10-13)
PRUDHOE 8AY
NORTH SLOPE,ALASKA
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARD
INTERPOLATED VALUES FOR EVeN 1000 FEET OF MEASURED DEPT
TRUE ,SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION 4ZIMUT~
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -89.03 0 0
1000.00 994.16 905.13 14 54
2000.00 1895.67 1806.64 35 39
3000.00 2630.6,3 2541.60 45 50
4000.00 3314.98 3225.95 46 27
5000.00 4023.35 3934.32 43 32
6000.00 4725.73 4635.70 48 12
7000.00 5394.17 5305.14 45 59
8000.00 6108.12 6019.09 43 25
9000.00 6825.36 6736.33 44 23
89.03 FT
10000.00 7556.17 7467.14 41 2
11000.00 8201.99 8112.96 54 34
12000.00 8802.96 8713.93 59 20
12107,00 8853.01 8763.98' 65 25
VERTICAL DOGLEG RECTANGULAR COOROINATES HORIZ. DEPARTURE
SECTZDN SEVERITY NORTH/SDUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET OEG MIN
N 0 O E 0.00
S 39 16 W 66.69
S 40 30 W 484.94
S ~3 50 N 1156.53
S 43 22 ~ 1882.48
S 44 41 W 2586.28
S 41 8 W 3296.27
S 45 30 W 4037.32
S 45 16 W 4736.66
S 48 45 W 5433.17
S 50 54 W 6114.80
S 52 9 W 5872.33
S 47 4 W 7667.05
S 47 34 W 7761.58
0.00
2.68
2.97
0.33
0.43
0.95
1.24
0.38
0.66
0.20
0.00 N 0.00 E 0.00 N 0 0 E
56.83 S 38.57 W 68.68 S 34 10 W
369.93 S 319.47 W 488.78 S 40 48 W
874.53 S 768.83 W 1164.44 S 41 19 W
1410.13 S 1263.44 W 1893.34 $ 41 51 "
1918.07 S 1753.15 W 2598.56 $ 42 25
2408.76 S 2266.72 W 3307.59 S 43 15 .
2945.44 S 2780.66 W 4050.64 S 43 Zl W
3437.21 S 3278.93 W 4750.34 S 43 38 ~
3912.67 S 3788.07 W 5445.96 S 44 4 W
1.34
0.36
5.45
0.00
4350.73 S 4310.86 W 6124.74 S 44 44 W
4831.47 S 4897.35 W 6879.47 S 45 23 W
5320.43 S 5526.50 W 7671.32 S 46 5 W
5384.42 S 5596.08 W 7765.83 S 46 6 W
13000.00 9003.90 8914.87 91 O0
13866.00 9011.50 8922.47 88 12
S 47 06 W
S 43 3O W
6398.10 S 6707.40 W 9269.50
6567.50 S 6869.40 W 9503.90
COMPUTATION D&TE: 30-JUN-86
STANDARD ALASKA PRODUCTION CO.
Y-Z0 (33-5-10-13)
PRUDMOE 5A.Y
NORTH SLOPE,ALASKA
INTORPOLATED VALUES FOR EVEN 100 FEE
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
0.00 0.00 -89.03
89.03 89.03 0.00
189.03 189.03 100.00
289.03 289.03 200.00
389.03 389.03 300.00
489.04 489.03 400.00
589.11 589.03 500.00
689.41 689.03 600.00
790.24 789.03 700.00
891.91 889.03 800.00
994.70 989.03 900.00
1098.73 1089.03 1000.00
1203.85 1189.03 1100.00
1310.37 1289.03 1200.00
1418.62 1389.03 1300.00
1528.56 1489.03 1400.00
1640.39 1589.03 1500.00
1754.27 1689.03 1600.00
1871.21 1789.03 1700.00
1991.84 1889.03 1800.00
2116.91 1989.03
2246.07 2089.03
2378.14 2189.03
2513.14 2289.03
2653.01 23~9.03
2796.02 2489.03
2940.13 2589.03
3083.69 2689.03
3226.95 2789.03
3373.84 2889.03
3521.54 2989.03
3668.91 3089.03
3816.61 3189.03
3962.35 3289.03
4107.29 3389.03
4252.10 3489.03
4394.78 3589.03
4535.99 3689.03
4675.73 3789.03
4814.37 3889.03
COURSE VEOTICAL DOG
DEVIATION AZIMUTH SECTION SEV
DEG MIN DEG MIN FEET DEG
0 0 N 0 0 E O.O0
0 17 S 23 54 E 0.08
0 5 S 87 0 E 0.03
0 14 S 33 49 W 0.21
0 9 S 4 36 W 0.46
1 13 S 12 57 W 1.29
3 19 S 22 8 W 4.50
5 42 S 29 14 W 11.51
8 45 S 36 32 ~ 23.90
11 54 S 38 41 W 41.91
14 46 S 39 11 W 55.35
17 1 S 40 41 W 93.72
18 58 S 41 24 W 125.90
21 15 $ 40 32 W 162.31
23 37 S 40 13 W 203.32
25 32 S 42 51 W 248.71
27 31 S 43 43 W 298.61
29 53 S 43 29 W 352.90
32 35 S 42 12 W 413.26
35 26 S 40 34 W 4B0.24
1900.00
2000.00
2100.00
2200.00
2300.00
2400.00
2500.00
2700.00
2800.00
38 0 S 40 25 W 554.67
40 12 S 41 16 W 635.78
41 18 S 39 48 N 721.30
43 23 S 41 33 W 511.20
45 18 S ~1 36 W 908.37
45 47 S 43 25 W 1010.15
46 6 S 43 42 W 1113.60
45 30 S 43 229 W 1216.32
46 25 S 42 29 W 1318.49
47 21 $ 42 I1 W 1425.54
2900.00
3000.00
3100.00
3200.00
3300.00
3400.00
3500.00
3600.00
3700.00
3800.00
47 13 S 42 34 W 1533.69
47 22 S 42 26 W 1641.45
47 12 S 42 40 W 1749.64
46 26 S 43 21 W 1855.29
46 11 S 43 15 W 1959.86
46 15 S 43 9 N 2964.23
44 59 S 44 3 W 2165.70
~ 42 S 43 49 W 2265.13
44 1 S 44 35 W 2362.53
43 38 S 44 30 W 2438.39
PAGE 6
DATE OF SURVEY: 08-JUN-86
KELLY BUSHING ELEVATION:
ENGINEER: L. HAUGAARD
T 'DF SUB-SEA DEPTH
LEG RECTANGULAR
ERITY NORTH/SOUTH
/IOQ FEET
0.00 0.00 N
0.42 0.34 S
0.07 0.55 S
1.01 0.69 S
1.39 1.16 S
1.18 2.05 S
1.69 5.47 S
2.36 12.30 S
3 · 88 22.90 S
1.90 37.28 S
2.74 55.78 S
2.15 77.71 S
1.83 102.06 S
2.47 129.72 S
22.08 161.37 S
2.42 195.58 S
1.53 231.92 S
2.24 271.29 S
2.17 315.67 S
2..71 366.33 S
2.21 423.57 S
1.09 485.30 S
0.70 550.95 S
1.51 619.87 S
1.03 693.01 S
0.42 768.24 S
0.27 843.45 S
1.55 917.82 S
1.49 992.97 S
0.16 1072.61 S
0.99 1153.07
0.71 1232.77
1.50 1313.00
0.~7 1390.31
0.54 1466.61
0.58 1542.93
0.46 1616.55
0.66 1688.43
0.46 1758.32
0.31 1826.69
COORDINATES HO
EAST/WEST DIS
FEET FEE
0.00 E O.
0.20 E O.
0.46 E O.
0.33 E O.
0.43 E 1.
0.12 E 2.
1.13 W 5.
4.42 W 13.
11.54 W 25.
22.83 W 43.
37.72 W 67.
56.14 W 95.
77.52 W 128.
101.61 W 164.
128.30 W 206.
158.58 W 251.
193.00 W 301.
230.61 W 356.
271.87 W 416.
316.39 W 484.
365.00 W 559.
418.56 ~ 640.
474.52 W 727.
533.45 W 817.
598.34 W 915.
667.56 W 1017.
739.05 W 1121.
810.31 W 1224.
880.13 W 1326.
952.47 W 1434.
89.03 FT
S 1025.56 W 1543.
S 1098.80 W 1651.
S 1172.13 W 1760.
S 1244.69 W 1866.
S 1316.70 W 1970.
S 1388.43 W 2075.
S 1458.69 W 2177.
S 1527.77 W 2277.
S 1595.90 W 2374.
S 1663.33 W 2470.
RIZ. DEPARTURE
T. AZIMUTH
T DEG MIN
O0 N 0 0 E
40 S 30 14 E
73 S 39 39 E
76 S 25 55 E
24 S 20 5 '
06 S 3 19
59 S 11 40 ,
07 $ 19 45 W
65 S 26 44 W
71 S 31 29 W
33 S 34 3 W
87 S 35 50 W
16 S 37 13 W
77 S 38 4 W
16 S 38 29 W
79 S 39 2 W
72 S 39 45 W
06 S 40 21 W
61 S 40 44 W
04 S 40 48 W
14 S 40 45 W
86 S 40 46 W
13 S 40 44 W
81 S 40 42 W'
57 S 40 48 W
76 S 40 59 '
43 S 41 13,
34 S 41 26 W
88 S 41 33 W
47 S 41 36 W
16 S 41 39 W
39 S 41 42 W
08 S 41 45 W
07 S 41 50 W
95 S 41 55 W
66 S 41 58 W
39 S 42 3 W
03 S 42 8 W
57 S 42 13 W
52 S 42 19 W
C~PUTATiON ~TE: 30-JUN-S6 PAGE 7
STANOARD ALASKA PRODUCTION CO, DATE OF SURVEY: 08-JUN-86
Y-20 (33-5-10-13) KELLY BUSHING ELEVATION:
PRUDHOE BAY
NORTH SLOPE~ALASKA ENGINEER: L, HAUGAARD
INTERPCL~TED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE VERTIC&L DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE
ME~SUREO VERTICAL VERTICAL OEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
D.EPTH DEPTH DEPTH DEG MIN
4952.58 3989.03 3900.00 43 46
5090.48 4089.03 4000.00 43 17
5227.68 4189.03 4100.00 43 15
5365.32 4289.03 4200.00' 43 49
5504.89 4389.03 4300.00 44 44
5648.77 4489.03 4400.00 47 25
5797.78 4589.03 4500.00 47 21
5945.24 4689.03 4600.00 47 45
6095.53 4789.03 4700.00 48 44
6248.76 4889.03 4800.00 49 48
6402.63 4989.03 4900.00 49 14
6553.75 5089.03 5000.00 47 54
6701.91 5189.03 5100.00 47 1
6847.90 5289.03 5200.00 46 33
6992.60 5389.03 5300.00 46 0
7135.30 5489.03 5400.00 44 57
7276.74 5589.03 5500.00 44 47
7417.44 5689.03 5600.00 44 39
7557.81 5789.03 5700.00 44 23
7697.56 5889.03 5800.00 44 5
89.03 FT
OEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
S 4~ 33 W 2553,62
S 45 4 W 2648,41
S 46 10 W 2742.27
S 46 56 W 2836,82
S 47 36 W 2934.18
S 49 47 W 3037.58
S 47 1 W 3148.01
S 41 10 W 3255.91
S 41 8 W 3367.29
S 41 17 W 3482.58
0.46
0.88
0.44
0.54
0.90
1.96
5.56
0.49
0.80
0.59
0.77
0.72
0.43
0.88
0.37
0.36
0.44
0.44
0.74
0.38
1894,76 S 1730,18 W 2565,86 S 42 24 W
1962,24 S 1796,98 W 2660,74 S 42 28 W
2027.84 S 1864.21 W 2754.53-S 42 35 W
2092.85 S 1932.91 W 2848.89 S 42 43 W
2158.86 S 2004.48 W 2945.95 S 42 52
2227.33 S 2081.97 W 3048.87 ,S 43
2299.05 S 2165.99 W 3158.66 $ 43 17
2378.16 S 2239.96 W 3266.97 S 43 17 W
2462.67 S 2313.74 W 3379.07 S 43 12 W
2550.02 S 2390.23 W 3495.11 S 43 8 W
2636.25 S 2469.20 W 3612.03 S 43 7 W
2717.25 S 2548.40 W 3725.29 S 43 9 W
2793.94 S 2626.31 W 3834.52 S 43 13 W
2368.34 S 2702.33 W 3940.81 S 43 17 W
2941.71 S 2776.86 W 4045.32 S 43 20 W
3013.01 S 2849.51 W 4147.04 S 43 24 W
3083.18 S 2920.78 W 4247.00 S 43 ~7 W
3152.78 S 2991,17 W 4345,93 5 43 29 W
3222.06 S 3061.19 W 4444.39 S 43 32 W
3290.68 S 3130.61 W 4541,95 S 43 34 W
S 43 41 W 3598,97
S 45 0 .W 3712,03
S 45 44 W 3821.24
S 45 30 w 3927,52
S 45 30 W 4032,00
S 45 31 W 4133,69
S 45 23 W 4233.61
S 45 17 W 4332.49
S 45 20 W 4430.89
S 45 21 W 4528.40
7836.23 5989.03 5900.00 43 36
7973.74 6089.03 6000.00 43 15
8111.74 6189.03 6100.00 43 46
8250.52 6289.03 6200.00 43 59
8390.10 6389.03 6300.00 44 35
8530.81 6489.03 6400.00 44 30
8670.55 6589.03 6500.00 44 11
8809.73 6689.03 660C.00 43 51
8949.15 6789.03 6700.00 44 22
9088.86 6~89.03 0800.00 4~ 2
9228.26 6989.03 6900.00 44 15
9368.02 7089.03 7000.00 44 13
9506.99 7189.03 7100.00 43 28
9643.76 7289.03 7200.00 42 49
9778.73 73~9.03 7300.00 41 41
9911.28 7489.03 7400.00 40 29
10043.57 7589.03 7500.00 41 3
10177.5~ 7689.03 7600.00 42 4~
10317.74 7789.03 7700.03 46 21
10470.88 7889.03 7800.00 51 58
S 45 21 W 4624.37
S 45 19 W 4718.65
S 45 22 ~ 4913.64
S 45 46 W 4909.79
S 46 13 W 5007.11
S 46 56 W 5106.06
S 47 40 W 5203.67
S 43 43 W 5300.47
S 48 48 W 5397.59
S 45 42 W' 5495.15
S 48 45 W 5592.26
S 49 20 W 5689.90
S 50 2 W 5786.35
S 50 54 W 5879.56
S 51 22 W 5970.07
S 51 19 W 6056.90
S 49 41 W 6143.39
$ 48 54 W 6232.58
S 4) g~ W 6330.74
S 50 ~2 W 6446.54
0.63
0.52
0.37
0.78
0.92
0.40
0.70
0.76
0.27
0.38
0,28
0,47
3,25
1,07
0,56
0.69
2.22
2,18
3,23
3,11
3358.21 S 3198.96 W 4637.98 S 43 36 W
3424.53 S 3266.11 W 4732.32 S 43 38 W
3491.41 S 3333.71 W 4827.38 S 43 40 W
3558.82 S 3402.39 W 4923.56 S 43 42 W
3626.48 S 3472.43 W 5020.87 S 43 45 W
3694.52 S 3544.32 W 5119.73 S 43 48
3760.77 S 3616.02 W 5217.18 S 43 52
3825.23 S 3688.23 W 5313.70 S 43 57 ~
3889.21 S 3761.32 W 5410.50 S 44 2 W
3953.53 S 3834.68 W 5507.74 S 44 7 W
4017.62 S 3907.65 W 5604.55 S 44 12 W
4081.67 S 3981.36 W 5701.87 S 44 17 W
4144.17 S 4054.87 W 5797.94 S 44 22 W
4Z03.49 S 4126.88 W 5890.71 S 44 28 W
4260.27 S 4197.55 W 5980.75 S 44 34 W
4314.44 S 4265.62 W 6067.12 S 44 40 W
4368.96 S 4332.92 W 6153.21 S 44 45 W
4427.81 S 4399.95 W 6242.20 S 44 49 W
4491.92 S 4474.30 W 6340.09 S 44 53 W
4566.24 S 4563.22 W 6455.50 S 44 58 W
STANOfiRD ALASKA PRODUCTION CO.
Y-Z0 (33-5-10-13)
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 30-JUN-86
PAGE
DATE OF SURVEY: 08-JUN-86
KELLY BUSHING ELEVATION:
ENGINEER: L. HAU:GAARD
INTERPOLATED V~LUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURS5
MEASURED VERTICAL VERTICAL DEVIATION AZimUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
89.03 FT
10637.17 7989.03 7900.00 53 33
10807.03 8089.03 3000.00 54 7
10977.63 8189.03 4100.00 54 28
11149.80 8289.03 8200.00 54 16
11320.29 8389.03 8300.00 53 46
11488.36 8489.03 8400.00 53 38
11652.48 8589.03 8500.00 49 27
11804,12 8689.03 8600.00 49 28
11973.23 8789.03 8700.00 57 53
12107.00 8853.01 8763.98 65 25
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET OEG/iO0 FEET FEET FEET OEG MIN
0.80
0.08
1.15
0.73
0.58
0.33
3.78
4.14
5.27
0.00
4649.85 S 4666.48 W 6587.65 S 45 6 W
4735.07 S 4774.12 W 6724.07 S' 45 14 W
4820.27 S 4882.96 W 6861.37 S 45 22 W
4905.43 S 4994.27 W 7000.43 S 45 30 W
4986.76 S 5105.86 W 7137.06 S 45 40
5064.56 S 5216.29 W 7270.45 S 45 50
5138.35 S 5323.38 W 7398.72 S 46 0 ~
5211.46 S 5410.68 W 7512.31 S 46 4 W
5304.86 S 5509.78 W 7648.48 S 46 5 W
5384.42 S 5596.08 W 7765.83 S 46 6 W
S 51 19 W 6579.23
S 51 51 W 6716.24
S 52 4 W 6954.14
S 53 13 W 6993.84
S 54 21 W 7131.19
$ 55 15 W 7265.31
S 54 44 W 7394.27
S 46 40 W 7508.07
S 46 59 ~ 76~4.21
S 47 3~ W 7761.58
12207.00 8889.03 8800.00 70 54
12706.00 8989.03 8900.00 82 30
13866.00 9011.50 8922.41 88 1Z
S 49 30 W
S 47 36 W
S 43 30 W
5444.50 S 5666.00 W 7857.80
5764.40 S 6034.40 W 8345.20
6567.50 S 6869.40 W 9503.90
SCHLUMBERGER
O l' RECT '[ ONAL SURVEY
COMPANY STANDARD ALASKA PROD. CO.
WELL Y-20
FIELD
PRUDHOE BAY
COUNTRY USA
RUN 1
DATE LOOOED 08 - JUN - 86
REFERENCE O000?ISS?
WELL: Y-20 ~ ~3-5-10-13)
(1440' SNL: ~ ' WEL, SEC. 33, TllN, R13E)
HORIZONTAL PROJECTION
NORTH ~00 ~EF ~0~71Sb-7 SCPJ. E = 1 / Z0130 I N/FT
4000 ! ! ! ! i i ! { i i i i i i i i :. i i i
: : : :' ~ , .... --, ..... ., ~ , , , , ; ; : - ......... : ; , i~4--,-,-4-4-; , ,- . _: .L4~i!
i~:.'i: i!I! !!il iiii iii! ii~ ! i i I I I i i i ! ! i i i i I ~ _-" i _-" ! ~ ~ i . i I ] i
! : [ ~-:" [ ] ! -'":' : : [ [ ! [-:-L[ : [ ! [ [ i i J, '4--k4-4-] [ ':.L"-L4- -4- :-L '-LJLJ-4-44,-L-ill ~4_L4_._4_& .[_4_
~Lii I ii i iiii i iiii iii i i i~i: iTI-T iiii i!ii iii! iii iiH--
i i i i i i i i ' : ........ : : iii! iii! !Ii [ ~ i i i [ i iii]
'lll!]iiii i:|.:' !ii: iiii Jill iiii i~il llli i;.'i~ ii i i I[ il i .~i i iii [ iii: iii::
: : : :a : : ~: : : : .......... ~ .......... : .... : : : ...... ~ . , , ...... __
-.":: ..... I::~ ,:--'-." _il':.._': :::_::..' ._'l__':__.'::l:' ......:_..._.: ~/.~.'~,:::: _.._.:~__~:~::::.~
. '-4-44-~ .... - -: :-4- ~4-4-4-4-4-- -4- '4-4-4-~-4-a-4-4-- -4-44-4-- -4-4-4-~- ~r_,r-~-~ I~...' 4-4-4_. -4-~-4-4-4-4-~..¥.. ~-4-4-4-..~4-.;-4-4--.-4-4...;-4...-4.-4-4-4--
-~ .~4-~ ..4- -~-444- :4-~4- ..4--~H'-L44.4-b- -~44---~-~ ~-+~-44-- 4-44-4-,-4-"74-~---~-4--,-b4-4..4 .... .q-4-~- -~-4-~-4:--
-I...-!~~,-T ...'F~I- .."FF ! ~ ~'---.:'T.' . ix /00 ;, ~-I-F.: 'FT:--F' -F-? .-FFll '"7"-FT'T' -?-'F .'F~" '- ,.'F'FF% --'YT'l--'?l'-- l'"F'
............ ' '- ' ' 4-4--4-4-- -.4-4-.4-.4-- --i-.4-4-.4~ .4-4-.4-4-- -4-4-4-4- .~-4-4-.~-. -4-.~-..i-4-- -.4-4-.1~....i-- .-.4--~-.4.-4- ,-4-4-4-.,- -4-4--i-4--
H
--~-*-~--:--bm~--~--m-~-~--*--m[--~--~--m-4-.a-4~4~4-.~i--i-4.;l~,r~-[~-½-4 ................. 4-4..4-4-4-.4-.4 ..... *-4-4-4---4-*-4-4 ..... [----~-4--~,-~--~:-l'~--~-'.'~ ..... ~..4-4-4..4..-~.4-4..-,..-~
-4-4-4-4-Jr:4-~-~..4-~-*.'.:-b..': 4-~]-¥4-4-4 .... bL ::"'.''' i-.::- ii i-4--]~4-44-.-444-4-..t-.~-4-444--.-44-4-4 ...... ,:..4-.,.':..4 ..... H'44't"-i-H"i-H-.~-~ --'bi---il--i--t--'i--Li--?--~--~"*:lll~--'
-4-4-4-4--r--L-~4--4-~-4-4-4-4-T4-4-4-4---4-' *-*- .-:-4-'4-4---4-~.-".-H-H] 4-4.- .4--[--}--4--H4-4-T-,--4-4..4-- -4-4-4-4.. -4-4--[-.~---~-.~,--}--}- ...... ~-.4-.-~--4 .....
-8000 '~--*-.'- r't~--h!-~-~";.'-~'-h~'PSff~-'~?'~-~-~-~"~'?"-~~-";"'~-'..'- .... ~-~-~-h!-?"ff'?i .... t%.'.-'-'tl-'f'ff%¢ ...... ?~-'¢"'?-}'i-'¢-i .......t-?7"~-T'?"i''i''Y
~ ~..~_Zz44_~4-~ 4~.4.~_~_~_.~__ .~..~_4-~_..i.1.L.i__ ..i-~-.-::'-.~-L~...LL~ ...... :--~-.L~-.b~--~-.; .......... ~-..~ ..!.. ~.. ~..:...-~...~..~
.-L-L3,_-L4..-L-L-L-Li..-L4..-L.i_J,..-L-L .:--Lu--L4-4-4-~-~4-L~ ~4~.4_-L4_4__.-L4_4-.3..4..-L.L4.4_~__!...L.L.L3,...L..L.L~ ....... L4...L.4-.i_.L.L-L.~ ....... ~....L.L L.L.L.L..L.L.
............. , .............................. , .....................i-~ ....................... , .................. 1 ................... I ...................................... t .................... i .................. : .................
.-L4_4_.L.L.L4_4...L. ~_L4_4_4..Z-i4-4--L4_4-4M-Z,1: : : -4- 4-~_.~_4-L4-L-4..4--L4_d...L.4_4-4_ __L.L.L.L.i...;...;.._i...i_...._i_.L.L.L+..L.i_.L.L.,_i...i...L.L.;..: .......
:4.-4-4-%4~4-44-*:"- -4-4-4~-4-4-¥4-.'4-4-b. ':-b~4--b4~4- -4-~4-H-4-~-:~-i-4-4--4-i-4-4---i .... H...bi-b?-.H--! ....... H"i--!'-b?--h-H-'i
: : :J. ' : : : : J- :- : : '-: : :-:- :-:::-4-::-:-:--:-4:-4- :.4-J,-i 2-4 :-4--L .-: J. :-4- . :~ :.i i ..:, ~-4 -~ ~ - ~ -~ -4 4 ' *-4. -; , ; .*'il
~.+-t-t--4,-+-+-+--~-- -+++--e+-+ff-*..'-? -+-t.-~-jr-i-ff.'--tff-' "t~:-ff.:-%l--t-'.f%f'1"'t-f-h-!--??'??'t" -ff--r-i-..:--f-f-t-..f.? ....... i....i-.-i..--~-!--~-.~--~---?.i-?"-~...... i--,....... ~--',--
i: _i. :..~_ :...L.i...i_ ...-L._i_-L4-i_4-4-4_4~.-4-4..4-4...~-4..4-,--~-. -4~~-~.'-.~~-[--~ H.~--~ ~-t *;-~ ~-t ~ e-.+-~ -~i !-t i ff ~ ! t '~ fl ? I ; '~ ?-t "7 't ..... ;'1" 7~"~'T"
::;i::~:.i:Lff~4.44-.-4-44-H.-44-4--b-44--..':--H-H-++-%-H-+!-+-ff-ff-!-i---;--b-!-H ..... H---; ....... ~-"?-'~--?-!-?-~"'+ ............. !---,.-t.-~--!-.~ ....... ~-.---!-.~-~-;..
--...:-'!-i-?r?t-f--! ....... H--H-~-t~-'H-'r?..'--H-t-i-!-'?!-- -?'t-~T!-':-TTT-T--??"i--r-'~--.."-'7-;-'-'7"T-FT ....... !"'F;'; "~-':-'U ......., ~';'"t .... · 7';" Z.'"7'7'7_"'
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :~:: :i ::: ~:: ::::::::::::::::::::::::::: :~::: I: :::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::
---i--t;--i-4.--b.H--i--~ ....... H-+-H--H-H-- -H-.H-H-H--!--r-H--H-.b-H--i--H--!--i--H.--i---!-.i--.i----! ...... :----~...!--b!-- ...... ~-.-~ ....... i.--!-.;--i..i 4.;..~...! ~'":"i'~'"! .......... ~-'~-'
SaUT~-~ooor-?"~--~--i-r¢-??-¢-t-"!-??-¢-i-t-~-??'t-'?':--i-?i-'~-'!-~-~ ..... '.'-':-'~-:i-:-'~T-h['i-"i":-~'i--i-~-'~-'~-'t--!'"~"'! ....... l"'""~"'i-'~"'[~ ........ :"1-': .......... ?"t ......
- 10000 -8000 -6000 -4000 -2000 0 2000 4000 6000
NEST EP~T
WELL: Y-20 (33-5-10-13)
(1440' SNL, 3 ' ~'WEL, SEC. 33, TllN,R13E)
~RTICAL PROJECTION
48.
-4000 -ZOO0 0 0 ZOO0 4000 6000 8000 10000
iiii iiii:iiii iiii iiii iiiiiiiii ii~ iiii Jill iiii
· ' ' ' ' ' ' ' ' ' ' · · ' ' ' ' ' .... ' ' ' ' ' ' ' : ' ' ' ' ' ' ' ' ' I - : , , .... : ~ ! · · , ., , , . ~ : ~
-~-~ ~ ~-- ~-~ -~-~- r ' ' - ~ ~ i ~ ~ ' ' ~- ~,-~ - ' ' .~4-~-4-,~4- -~ ' ',.~ -~.-4-4-~, -4-~.-4-,~. -~4-~.
~-4--~ '-~-4~-4 ' .~-4-4-~-.-~-4----~ ' ' ~ ~4-.~ .-~- ~4-~- 4-.- 4-4 .... '-'- 4 4-- -4.~4-~- -4,-4-4.-4--
~-~l-+ff-ff-~-- -ff-~-~ff~-~-~- -ffffff-~-,-+ff-+~ -~.+~+++-~ ..... ~--.e+~q -+.+++-,-e+~-+- ~+--~:+4.--,-4-ff-++-ff-.e.i-++--,-~+-+-
+~"5-+~'~-0-'- -+-5-+5-'~0-5'-0-+' -0-+-0-5-4-'+-++~- '-~5-4~"9-4-4-~-' '~-4-~'4"4'~'-'*-~4-- ,-~4-4-.*-~-4---4--0 ....... 4-O4--4-.~4.--4-4-~--
--+~44-'-4-4-4--4--~-+44~-+-¢+e..-+¢+4 .4-¢44 .... ~4-4~ 4.4-P.~. -.;.4-4.4...~-%4.4-4..._44_4-4..,.4.4-~.;...-4..4-4..~.. -.:..4-4-4--&.z..4..4_ '4 .-i-&4.-.
++-->~t++++---ff--f4++4--+++--f-4-~4-~-4-~4~-++4-.+1-++4+ +.~¢44--4--i--~+-.-+4-+4--.h~+e&-.-+4-i--+¢..+-~-4+-
++~.~+++~- ~4-~- ~..+~-+--~-~$~4-4~4~--~-.~$~-~--.~4-~44-444.....4-4-44-++.i-~4..--4..4-4-4-4-4-4-$ 4 ...... 4-4-4..4~...~...~-4-4 ....
: : : =/: : : : ; : : : ;~ : ; : : : : : : ~ : : : ~ : : : :I: : : : : : : z/ : : : : ~ ~ ! : , : ! , : ,. : : ;~ : : ; ; : ~ : / . : : ,.
]~]7~]~?[Zi]][] ]Z![!?.TT]Z]]]i ]]-77-Fl"~]ZZ~I ]~-T[tTTTT'-X-~T'i-TTTT" ...... -1-TT'r'I "TTT"~ ..... ....... F"rT"[]"T]TT'T" ..... "T'T'~"i-t-'Ni-TT'
T 7 ~/~ FT i i ] ] T ! l~ ~ ! ~ TT'TI?IT-TT"'-TT'TI-'?-'UX, F'T%T']"T"i-7~ rT'1"'~ "T'rT'"r
...~_l_l_l_. (,1_4_1_2_:_2_.;.1__i_: l..~i_i _l_ L4-j ~i__i4_4_&L4_~2_~. _l_l 2-4 4 ! L Li ~ i ; i 4 i _2_ 2 _ }_2 4 i ; ; 4 J ;_; i ; 4 ; ; ; J-:
: i ~ i~ ~ : ~ i i : i ~ ~ i i : : i i ! ~ : ! : i i : : : : ~ ~ i i . : ; ~ : : : ~ i ~ i : ~ : : : ~ ~ : . : i : : i : : : : :
I-?i-Ct'i-?''???'~''?''~li'''??'t"rc~ttt?t~-''??t'''tt?~ ...... t--?-??i'-t-??-~ ..... ?'??7?-?-?'-; ....... ?"t"??T'"?'??"} .....
-~-3...i...~-,..~-.~-3-.~..~-4..i.i4..4-L&.$. L.. ~-.~4-~.-~;.~-~-.¢-- -~-g.aa.-a-~-44-.4-L.L-L-L-L.¢-3-.-~ ...... L4..L4...,.._U..;...i..4 i...L..~...L..{...L..;_.~_.~ ...... Li...L4..¢_.~..X_.¢...L.
-4-.~44-e~4-~44.4-%4.4-4-.444.4..--44-4-~%~4- ~4.-4-%--~s~-4--.4..~444.--~-.~-.~-~ ..... ¢.-.}...4--c-4...;...;...;...4 ....... ~.-.~-4...;+4...44-.~..-4..~..¢...F+4...4..+-4-q
FTT'T~ .... FTTT1-TTT'r,~TTT-~~T'T'~TTTT~-"~-VT'~ .... r'rT"~ ..... T'r%r'Y%T'T"~ ....... T"rT'T'TTT'~'T-"TT'~"'~ ...... ;'7'TT~
,~i~ii~l ~::i}i~ ~i~ ~ ~ ~ ! ~ ~ i ~ i i i i il~ ': ~ ~ ~ : ~ '.. ~ ~ ~ i ~ ~ ! ~ I ~ ': ~ ; '. ; ~ * I" "~ ': ~ ~ ~ ~ I *': ~ '' ~
-.~..4-4.-~--}...4-4..4.. ~-.4-44-4-4-4-~-~4 .... i-~}--4-4-4..~4-~ 4-4-~-4-.4.4-~--~--~..4...4...~...~..4...$-4-..} ....... 4...4...;-,.;...~.,.-...~-.; ............... ~....i,...,,.-}--. i...$ .-,...; ....... ;...4...., ";"1 ....... ;"';'";'"!
.... L~-i4..-L.L~-4-.i ..... i-L4-.i-$...i...Li 4..--4-$..L.L~-..i-.L-i...L--4,-4-$.4..L4-.L.a~-. -~-.L44...i-.L.L.L.i ....... L.L-.~../,...L-;..-L.;...i ....... L..L..L..;.+...L..L:.. :...I...L...:.. L.i...,...L.;...L.4
'-T~"!T-T'%'?-TT "T'T'?"7 F'TTT"F~-'rT"T% ~%-"~"~-'i ..... T'T'T'TT-F'7-TT-"-~-7"7'TT'r'r'?T ...... ?'"F'T'T'T'-r"~ ~ "'~'; ": ........ f'"~-'r'-"T"l'"7':"~"'7'T"r'N'?-'r'
............ ~ ...... 7'7T"!-"~i! ...................... " ....... 72 ...................................... ~ ........ 7777'5 ........ ~X ..... ?'5"~ .......... ~"~i'"? ...... ~"'5"::r::5'5~~:"77':":'5"~
'-W'TT'rT'T'T'-NT"~'-T"r'T"NT-T"7'"F'T''qq ---r'-rr-rw x--r --r-'.'- r-r'?" r' r'["-r "r": ..r.,.-.r-¥--~-¥--~.-x-. r-r ....... x" ?"r ': "' r-": ................ · ............~~:': '::::'7'* ....... : ......... .................... ;": '} .......... ."'
"?"?"'r":-N-r ...... r"r']-'~-r'"~"'?-1-'r-r-r'* ...... r---m-r"'?~'--m-:"?"'-r'-- h'":'"?""m'r'"r"c"?"'?'"r"'* ......... : ........ r?---r--r ........ ,'"~(" :"":'"r",'" ~ .................... : ........... ~ ..... r ....... :: .............
+-H4---r-+4 '+4 ......] ~-'~"'~"+'-?'~"'~'+'+'1 ~' ~ ~'r
-/+--+-~--?~+--~-'--b{--~'+'~-+-f--h~'---}--~ ...... F+'~"'~'"'~"'Y"~"'~"~ ....... ~"~"-~"':"': ....... : ......... ~ ..... .... ~'~ ':: ............ ~ ..... ? ": ~"1
-t~-'?'?~"'~-?'~'i ...... ?-?-r"?i-'?r?--¢ .... i"R~-hM"T i-?'?'?'"["??"?+"}' '?'''~'''?''''~''':'''?'?''':'¥''{'''?' '~'!' '+'-?': .... : ....~ ~"~'-:":~ ~ ..... ~ ....... "i
1 ZOO0
Z'ZS.
PROJECTION ON VERTICAL PLANE 228. - 48. SCALEO IN VERTICAL OEP]'HS HORIZ SCALE = 1/2000 IN/FT
Teleco Oilfield S
6116 Nielson Wa,
Anchorage, AK
99502
(907) 562-2646
May 28, 1986
3s of Alaska Inc.
JOB # 495 TAK
STANDARD ALASKA PRODUCTION CO.
WELL: Y-20
PRUDHOE BAY
AUD #2
Please find attached a copy of the computer calculated MWD directional surveys
for the above mentioned well.
We at Teleco appreciate this opportunity to provide service 'to Standard Alaska
Production Company.
Teleco is committed to providing the highest quality of service and we would
welcome any comments or questions concerning these surveys or any of our other
services.
Sincerely,
Pat Havard
Field Service Supervisor
PH/el
Enclosures
A ~I!~? COMPANY
Date 05/28/86
TELECO OILFIELD SERVICES
JOB 495 SURVEY CALCULATIONS
Page
Company:
Well:
Location:
Rig:
STANDARD ALASKA PRODU
Y-20
PRUDHOE BAY
AUD # 2
TELECO Job # 495 TAK
Grid Correction:
Magnetic Declination:
Total Correction:
Proposed Direction:
0.00 degrees
31.50 degrees
31.50 degrees
228.10 degrees
RADIUS OF CURVATURE CALCULATION
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
TIE-IN
500.00 0.0 228.1 S-48 06 W 500.00 0.00 0.00N 0.00E 0.00 N 90.000E 0.000
TELECO MWD
993.00 15.3 221.7 S 41 42 W 987.16 63.60 52.85S 38.03W 65.11 S 35.738W 3.151
1154.00 18.5 223.1 S 43 06 W 1141.19 110.16 87.40S 69.58W 111.72 S 38.524W 2.003
1359.00 22.5 221.7 S 41 42 W 1333.17 181.58 140.41S 117.98W 183.40 S 40.040W 1.966
814.00 9.7 218.5 S 38 30 W 812.48 25.25 23.23S 13.08W 26.66 S 29.397W 3.182
633.00 4.2 203.1 S 23 06 W 632.88 4.41 4.48S 1.91W 4.87 S 23.100W 3.158
TELECO Job # 495 TAK 05/28/86 Page 2
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
1540.00 25.7 224.9 S 44 54 W 1498.37 255.21 194.18S 168.65W 257.20 S 40.976W 1.909
1729.00 29.4 225.2 S 45 12 W 1665.91 342.49 255.93S 230.51W 344.43 S 42.009W 1.959
1918.00 33.7 223.5 S 43 30 W 1826.94 441.14 326.62S 299.62W 443.24 S 42.531W 2.323
2107.00 38.1 222.8 S 42 48 W 1980.00 551.53 407.46S 375.40W 554.03 S 42.655W 2.338
2297.00 40.5 222.8 S 42 48 W 2127.02 671.42 495.78S 457.23W 674.44 S 42.684W 1.263
2485.00 42.8 224.2 S 44 12 W 2267.48 795.95 586.39S 543.24W 799.35 S 42.812W 1.318
2656.00 45.4 223.5 S 43 30 W 2390.27 914.62 672.20S 625.67W 918.33 S 42.947W 1.547
2862.00 46.8 225.9 S 45 54 W 2533.11 1062.77 777.70S 730.07W 1066.69 S 43.191W 1.080
3051.00 46.4 226.6 S 46 36 W 2662.97 1200.02 872.66S 829.27W 1203.83 S 43.540W 0.342
3281.00 47.7 222.8 S 42 48 W 2819.68 1368.04 992.29S 947.66W 1372.12 S 43.682W 1.335
3676.00 47.1 222.8 S 42 48 W 3087.04 1657.74 1205.70S 1145.40W 1663.02 S 43.531W 0.152
4149.00 46.1 224.9 S 44 54 W 3412.03 2000.45 1453.50S 1383.49W 2006.67 S 43.586W 0.384
4619.00 44.1 225.9 S 45 54 W 3743.78 2332.97 1687.25S 1620.52W 2339.42 S 43.844W 0.451
5182.00 43.1 226.6 S 46 36 W 4151.48 2721.01 1955.72S 1900.98W 2727.37 S 44.187W 0.197
5655.00 47.5 231.2 S 51 12 W 4484.10 3057.02 2176.62S 2154.20W 3062.40 S 44.703W 1.158
5894.00 47.3 222.8 S 42 48 W 4645.88 3232.75 2296.49S 2282.75W 3238.03 S 44.828W 2.587
6222.00 49.7 223.1 S 43 06 W 4863.20 3477.41 2476.30S 2450.12W 3483.56 S 44.696W 0.735
TELECO Job # 495 TAK 05/28/86 Page 3
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
6448.00 49.0 225.6 S 45 36 W 5010.42 3648.49 2598.90S 2569.98W 3655.00 S 44.679W 0.895
6665.00 47.4 227.7 S 47 42 W 5155.06 3810.19 2709.93S 2687.60W 3816.67 S 44.763W 1.032
6984.00 46.2 228.0 S 48 00 W 5373.42 4042.72 2865.98S 2859.99W 4048.88 S 44.940W 0.382
7357.00 44.5 225.6 S 45 36 W 5635.55 4307.98 3047.60S 3053.41W 4314.07 S 45.055W 0.646
7640.00 44.4 225.9 S 45 54 W 5837.57 4505.99 3185.89S 3195.36W 4512.24 S 45.085W 0.083
7922.00 43.2 226.2 S 46 12 W 6041.10 4701.05 3321.35S 3335.89W 4707.39 S 45.125W 0.432
8207.00 43.8 226.6 S 46 36 W 6247.83 4897.14 3456.64S 3477.95W 4903.52 S 45.176W 0.232
8586.00 44.4 228.7 S 48 42 W 6520.00 5160.86 3634.30S 3672.86W 5167.02 S 45.302W 0.417
9059.00 44.3 231.2 S 51 12 W 6858.25 5491.29 3847.03S 3925.93W 5496.60 S 45.582W 0.370
9343.00 44.0 230.5 S 50 30 W 7062.03 5688.88 3971.92S 4079.34W 5693.61 S 45.764W 0.202
9721.00 42.1 231.9 S 51 54 W 7338.24 5946.52 4133.60S 4280.42W 5950.52 S 46.000W 0.563
9991.00 41.0 232.2 S 52 12 W 7540.30 6125.18 4243.73S 4421.64W 6128.64 S 46.176W 0.414
10197.00 43.0 229.4 S 49 24 W 7693.38 6262.85 4330.84S 4528.44W 6266.02 S 46.278W 1.330
10282.00 45.4 230.8 S 50 48 W 7754.31 6322.07 4368.84S 4573.90W 6325.14 S 46.314W 3.048
10378.00 48.7 230.8 S 50 48 W 7819.71 6392.18 4413.20S 4628.30W 6395.12 S 46.363W 3.438
10520.00 52.9 232.9 S 52 54 W 7909.44 6501.95 4481.15S 4714.82W 6504.63 S 46.456W 3.170
10734.00 54.1 233.6 S 53 36 W 8036.73 6673.28 4584.07S 4852.65W 6675.48 S 46.630W 0.619
TELECO Job # 495 TAK 05/28/86 Page 4
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
11112.00 54.1 234.0 S 54 00 W 8258.32 6978.01 4764.94S 5099.78W 6979.43 S 46.944W 0.086
11305.00 53.7 236.5 S 56 30 W 8372.02 7132.73 4853.82S 5227.90W 7133.76 S 47.125W 1.068
11522.00 53.0 237.5 S 57 30 W 8501.55 7304.73 4948.64S 5373.91W 7305.34 S 47.359W 0.491
11723.00 48.5 230.8 S 50 48 W 8628.69 7459.39 5039.73S 5499.97W 7459.80 S 47.500W 3.415
11877.00 53.4 228.0 S 48 00 W 8725.68 7578.91 5117.53S 5590.74W 7579.28 S 47.530W 3.481
11970.00 58.2 229.4 S 49 24 W 8777.94 7655.80 5168.28S 5648.51W 7656.16 S 47.542W 5.309
12066.00 63.2 229.4 S 49 24 W 8824.91 7739.46 5222.73S 5712.05W 7739.80 S 47.562W 5.208
12161.00 68.4 229.4 S 49 24 W 8863.84 7826.04 5279.09S 5777.82W 7826.36 S 47.583W 5.474
12254.00 73.4 229.7 S 49 42 W 8894.26 7913.87 5336.08S 5844.68W 7914.17 S 47.605W 5.385
12342.00 76.8 229.4 S 49 24 W 8916.88 7998.88 5391.25S 5909.38W 7999.15 S 47.625W 3.878
12368.00 77.6 229.1 S 49 06 W 8922.64 8024.22 5407.80S
12437.00 79.4 229.8 S 49 48 W 8936.40 8091.82 5451.76S
5928.59W 8024.49
5979.96W 8092.07
S 47.630W 3.278
S 47.646W 2.792
12772.00 84.6 227.3 S 47 18 W 8986.79 8422.89 5671.46S 6227.64W 8423.12 S 47.676W 3.152
12676.00 81.6 227.7 S 47 42 W 8975.26 8327.60 5607.08S 6157.38W 8327.83 S 47.678W 2.905
12630.00 80.7 228.7 S 48 42 W 8968.18 8282.15 5576.79S 6123.50W 8282.38 S 47.675W 0.897
12595.00 80.8 228.4 S 48 24 W 8962.56 8247.61 5553.92S 6097.61W 8247.84 S 47.672W 0.736
12500.00 80.7 229.1 S 49 06 W 8947.28 8153.85 5492.09S 6027.11W 8154.09 S 47.659W 2.335
TELECO Job # 495 TAK 05/28/86 Page 5
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
12865.00 87.6 227.7 S 47 42 W 8993.12 8515.66 5734.14S
12923.00 89.6 227.3 S 47 18 W 8994.54 8573.64 5773.31S
6296.04W 8515.90
6338.79W 8573.88
S 47.674W 3.254
S 47.673W 3.517
12960.00 90.8 228.0 S 48 00 W 8994.41 8610.64 5798.23S 6366.13W 8610.87 S 47.673W 3.755
6421.11W 8685.86
6492.36W 8783.83
13035.00 91.1 226.3 S 46 18 W 8993.16 8685.61 5849.23S
13133.00 91.2 227.0 S 47 00 W 8991.20 8783.56 5916.49S
S 47.668W 2.301
S 47.657W 0.722
13223.00 91.3 227.0 S 47 00 W 8989.23 8873.44 5977.79S 6558.11W 8873.72 S 47.651W 0.116
6627.54W 8968.61
13318.00 90.4 227.0 S 47 00 W 8987.82 8968.33 6042.50S
13382~00 90.6 227.0 S 47 00 W 8987.26 9032.26 6086.10S
6674.31W 9032.55
S 47.644W 0.948
S 47.639W 0.315
13829.00 88.2 223.5 S 43 30 W 9000.31 9478.18 6403.33S 6988.76W 9478.69 S 47.503W 0.000
13740.00 88.2 223.5 S 43 30 W 8997.48 9389.53 6338.81S 6927.56W 9389.98 S 47.541W 0.818
13647.00 87.9 224.2 S 44 12 W 8994.32 9296.84 6271.79S 6863.17W 9297.22 S 47.578W 1.461
13551.00 87.8 225.6 S 45 36 W 8990.72 9201.06 6203.84S 6795.45W 9201.40 S 47.606W 0.958
13481.00 88.1 225.0 S 45 00 W 8988.22 9131.19 6154.63S 6745.73W 9131.50 S 47.624W 4.420
13449.00 89.1 226.0 S 46 00 W 8987.44 9099.23 6132.21S 6722.91W 9099.54 S 47.631W 2.699
TEuECO Oi i ~i~l d
PLAN VIEW
g600 8000 6400 4800 9200 1800
I
WEST
0
600
9200
4800
8000
9600
1 1200
128O0
TbLECO Oi 1 ¢i el d Services
VERT I CAL PROSECT I ON
2000
4000
~ §000
8000
10000
12000
14000
16000
18000
0 2000 4000 6000 8000 1000O 12000
VERTICAL SECTION (~t)
E-; R E A T L A f'-! [-:, D Y R E C 'i" "J_' O N A L D F.'. Z L. L .Z i'--~ g '.i: N C ~
S'¥'ANbARF;., ALASKA PRODUCTZ.r)N COi~iF'Af'-.!Y
C 0 ~,-i i::' A i-.! '~-
Y .-. 20
!..-..i E ',... i.. ?..! A :i--'i il;;
P !:..'. U O H 0 E f:: A Y
......................................................................................................................................................................................................
i.. ~..i ~..; f::'~ i J.i.i
Ai...486D.1.7 i"-iNF~ & SINGLE SH, OT 5-'27-',-36
..................................................................................................................................................................................................
i , f' ~.;. ..::. ~.., r'.. 'v' J:;. '.,' I.~ i.:'..
L Y N i'.! !-4. E J'--.! S 1_ E Y D Z R E C T Z 0 N A I._ S I_J e E J:;~ t,) Z S 0 R(._~", ....
................................................................................................................................................. :"~? :.-~ .. :'(..'.
t.,( rr:; i".'i E "f' Z ':" i... [{;. :;!; ); ('-. i'-': ,':~
,.-~ .,.") r-, F "[' 1 3 o c-9 F' T
........................................................................................................................................................................................................
0 i~i :,::' "f' i-'! ;'(i i'-.! "i' !!ii i:;; V ?', i... !::' ',:;.1 ~i? ;"i 'i' ()
~ --'7 8 - ~ ,:-'_-, Fi - 'r,' 4 - '~ '
!i." ~':':'~ '¥' E 'iii; !. i::.'. ".....~ !:i' '"~ .... i" .".':'~ i-( ii:'. i'".! i::' i::.'. ()?'-'; "i" f)
'"'uTc T"_'~ '- RECf-iRD i~F' A SIIE:--.SURF'ACE :z,!JRt~EY nF YOIlR
t ~: ........ : ...... i~ ....... ~' : ........
........ , r- :-,~--,-.-'. ..... ~ .... 0 " l"~l::' ""f'lllR SURVE]"( REPORT Ti,! Olaf
:.-'.: I::. J-! R ,! -..::. r-'- .... I F~ ..L 1'-.: t."_ I..~ A C P 'i' _., ,, ............. .
F'Zi_.ES FOR YOUR CONVENZEi"'~CE.';- HONEVER, SHOULD YOU SO
F:,.".'r--:;"rR~:', ,-'-',LL CRpTF'.::; nF THI::' SIIp~EY I;-:EF-'OI-;;T k!.TI_.L
.- :. ....... ~-. ~ ................. -.',~
F'F~PL-~AP.i.';,E[:,...,,,: "f'O YOli._ ON ,..~,.tR'rT'i-EN- REOllEST., ...... AI_L SURVEYS ~,,~..E*'r'
i-(EPT "J-N A LOCt-:.'.ED F_Z!._E Ai',!D ARE HELD Ti,.-'.. STRZCTEST
C 0 N F -z,: D E i',! C E ....
G. P. E A T t_ A t',...i 0 'D .{ R E C T ! r..: t"..t A L 0 R I L L [ N tS, [ N C %-
Client .............. ; '3TANDARO ALASKA
W e i ~ ' Y- 2 i]
C. lc, sure O irect ion~ , ~ ; S 48, ~l] W
Plsgr, e'~%c Oect in~s"t ion' 31 deg 31] rain ~S
Or~%~ 'f i ~e p, ame ...... { 'f-2i]. OAT
PROOUCI'ION COP1P,:\NY
It 0
R. A D ! i.j '3 0 F
4-29-86
M W D & S S
78 ,. 8 f t
CURVA'FI. RE
H E A S D R. I F T T R U ',/iS'. F:. T
D E P T H 0 G !"!i',,! [) E F:' 'f' H
8'L4 9 .-'1-2 Sl2, 48
99 :.-:, ! !:7 i. % 9 iS', 7., i :7'
'L154 IS 3fl.} i141. ~!]
SUB SEA SECT !ON
ir--
Sc.'~ i]$ 4 42
i',.I !] ,. 8-i
S 23, i. i] W
~ ,,~
:'.::, 41 . 7 P..
L:, 43 , 7 ] W
F: E k. A l' i V E ii: 0 C R 0 i t",.1A T L=..
F P. C: i'"! W E t_ L..-- H F:: A 0 [') I !:'; -t- A N C E
4-,48 !.:;. l:gl %/ 4...,87
',::.' 3, 23 :,:; !. ti',,
0 (.i-.. Mhl S
t] E
(} W
4'9 W
1'7 W
'L 3 $ '.;.~;:_'. 2 :.30 'L 33:5;., t 8
I. S40 25 4.2 i495, 38
'L '72 ':0 29 'ii .4..'L 66 5.9 2
l {.-'.~ '.t F; :? :3 4-2 I. 82 F., ,, 94-
.'"x -
.~ I i'J 7 :':: 8 6 ']. 9 a l], 130
,:' ..4. r-i "21] W
55 4:3, c...i] W
': .":'-~ $13 ;4
'::(a::.', ~:"': 'L69 :Li W '.2:'7 :LB
31.'26,, 1..*']. S 3!]0,118 W 4-I-:.3, 24-
-'$ t77" II ."~ ': '-' - - F; "=
.... - ..... :,Y~._,,, SF,W ..::,4: 03
.": t]
,4,-'I.
42
4 '.2
---- 2
1,7',.-'_19
'I.. , g S S
2 , 2 ?] 2
2, :3, 32
": ": q 7 40 .l ] 2 1 '" ":" t]
2 ;:3 r.:,:"~ 46 48 2 R_ 2,. 2 , ~,_ i
->n$'l ::'. 24 ",F, 62 .:sty
2048, 22 67t , 41
2 ! 88,69 795.93
23 i !, 48 91'4-, 6
2454. 3! 11162,7
2 F_.. 84, t7 1200.,
S '-4, 4-, 20 'W
S ¥3, SO W
S 46,60 'W
495, 33 ?.. 457,61 W 674, :36
585.95 :~; 54:3,,61 W 7'.:J9, 28
67:L,75 S 676,04 W 918, 26
77:7. 26 '3 7:i:0,44 !4 'LOG6, 82
· x.=: ,.,,:_ , 4 . :.2t3.:,, 7'7
S 4-2
:.:,, 4- 2
44
58
'L 3
3 :}:.
0 '.,4
'L 1.W
56 W
17 W
6 ~3 W
263
2 }~]l 'L
~ .....
257
,:, 281 ,+,' q- 2 '2 ;: l i: , :{, ,:4
::: ¢-:, '7 F, 4. 7 & 3 t] ct 7 13 c
.:'i- l 4-9 4 (, F, ::: 4 'k '2, I] 4
'.5t82 4-S 6 4i51, 4,. 3
2740,88 i:.-';,68, 02
:3008, 25 1.657, 54
.... 3 3 . ''~ "~ 4
.:.., 4 I] 1313 '-'
. 4. .6. ~ * ?_
3F>64,9S 23:32.77
4072,65 2720,81_
42
4-2,
44,
._, 'L . ".'_' I] ,
42, 80 W
43. 113 ",4
'4-~.
47,70 W
q ':'.., '~_, $ 6 ::; ',:: 4- 8 , t] 't t,¢, .... 1 272 , 0 ff,,
'i':~ l'lJ51'1 q 51 't i 4 5 c ,:: .. , '~ -
.......... :,,.. W !6F, 2 .,"b
'1453 I]'2 '" 13 ? ') F:5 %1 "~l] IF, 4:q
I~ F, ;:', ¢: , 76 ::; 1_ 6 '213 , 6 S W '":.. 33 '.,:~ . 1.. $
0'.,:}6
152
3 L 3
43
i]. 7:5; ,i-
- 2O
5- 2'7- F)~.
['1 E A S
) E F' T H
7357
792;:"
,,) b
9 (')"-"
_ 7.>
5) 7 2 I
! ii 19 '7
10282
10378
18.521]
1. 07 :.5.' 4
'l '!. 11 '2
i 13 Ii 5
11522
11723
t. 18'77
l 1970
!. '> 0 ~, 6
i '2 'l 61
i '22 c,.: 4-
12:"¢42
t2368
l '24. 3:7
1. '2 S FI 0
i. 2595
1. 2 F., 30
RE,3ORD i) F ::.;UFtVEY
ORIFT TR. t',,/ERT SUB'3EA '.~ECt. TiCtN OTRECTtON RELATI:",/E COOROtNAT
O (3 I""1N O E P 'T H . 0 E P. ]' H D I ':.., T ,'% N 6 L E F R. O..H !,,1E L L -';.,~ (-z. :.-,";' r",,_ 0 T.. ti; T A t"...I C E 0 ,S. ["t i'.,.l S
zi,., 6 I_ '2 c..., 37:3:, 4- ''~,., q,_. ~'.':" ':',... 4 ,. E, ;3 4 f3 '.4- ':'~ , c:,.,. 2 c-,., 48 ,, 13 t3 !,,f 2
" .'~ ': ...... '
4-q- ;}0 c7(52,5 <5 5,c;56 7c: 42t37 '78 c '"~ ,~:.,q b~ 387., t,.:. '::, :3. 8c::.:, ...... ?,:,
, ,, ,., ..... ~, ,./ .. .~ ,.., '~7 ,.. , ,¢ . * ,.
4-4- 2-"'~- 5°'"'"7 c-7 E'7"::a 77 4. c ,- np ,: Ac: ql] W
..... : ...... · ........ :13:-:, ..................... 3'1 ........ .-.',:3 ,,, 45 '2 13'2 ': ,::I-5 5 27 "'
· .::L ........ :': '}. 2 I{, i]/$ I i "t ..... '.::, ..... S.'I ,"-: n , 3 .... .t. ¥ 7 i] Iq , 0 q.., :} ':!- 6 , '"',: ..... I.) b.[ 3 ':~. 2. l] , ::",. c,'" ?., ;'~ 33 ¢3 ,. l"t.. '.:{; ~.,/ ' .... 7 , '~ 7 c .',;. %. 7 'R. 0 !.J,
43 ."4-3 G, 2.q.7 ,SC 6 " - "' i 3456 7 S 3¥78 12 ',..,, ~. .
. ~. ~.: ,,-J ,. 64- 4 ;596 ,. 9 4 S ,, (.-, ,, 60 ',4 ., 'L
d e g / 1_ (3 t.3
0 ,, ? 79
1'.3. 4. 28
8, 22!.
0, 2, i 4
13 , '2 :::, ,"J
;'t: .:"J
t3 c, .; ,,%
, ,..' z. ..
'3., 4 i. 0
4-3 13 76"9:~ :':;7 76'14 57 6'262 67 c- "~7t '4-i} W .', .... n q,'-, :., -,,-..-,o .4-5 '16, ,::,c:
' ' '-, 'o F, :2 'v/ ii., '.:: F, ..5
,~ ,,.. , ,., ~ ~ t. %' ,.", ,',~ ,.~ ,, .. 0 ,,: :P ,,- ....... ,, .-' ,~' ..;'
4c '"4 7'7c",'"~ :3n 767C; F;t3 63'"'1 ;'39 '3 qt3 SI] W ~:}E,;q 29 ,.i 4-574. }.37 W F, q2'z '.:t
..,." ,..--r-. ,~ ,..¢ ,. t ~ ~.L .~ . ,.. ,r . . , ..... , ,¢ , ,t ....
......... ' 13 462,,"; ',-,2 W 6,:,9" I
~8 4-:.' 7'"'" ' c 39 i] i~ el'] iql] "d 4.41 ..' ,...q ..... .% '.:~',:t I~; 46 ')?':
,,, I_ 9., 713 ,7'7 '4 }] , 9. 13 ,.> _ ,::, .,' ................... , ....
c,, 2 c.., 4 '~',. ,,a. 0 o,..., .43 '."', ,..,"-"' :? }3 ,6 3 6 %. i] I , ?.3, 4 ':,., F,. 2 , '.q. i] W 4- 481] ,, -,.7 ,%. ':.., 47 t.. 5;. ~ 8 3 W ~-:, 5.. 84- , q,... i :;. 4 E,. 9.._ 7 34 W
c:.., 4. F, g I32 F.: , 7 2 7 ,.q c:..., -7., .9. 2 6 6 7 3 , 17 ?.. c..., 3 , 6 fl_ W 4- F:,_ ;a,. 3 , 6 7 P. 4- ,..ct F.,. 2 , S 6,. t.t 6 6 7 <,_, , "~.., % "-'._., 4-6 :'.: 8_ 2 'vt
'1., 159
2..944
:3., 4-38
3, 1 f) .4
O, 680
F; '..q- 6 8, 2 F; ;,.:t 37 ,S 1 '7,a 7:, '7 69 77 '~ ...... ':' P :" q 9 k,,¢ !a .'-3 '"' " '-'
o5 :- b~, t]13 bi .q- ,, f, ..4. _c:1 ..,, c, 5 f., 7 6 1~ 4-b 56 :.'.'~ '
.... , . ,. , .' t . ,, ~ , ,. ,_, ~ , .' ,J ,Z, ,'L , _ ~ - ~ ,~ "-- ~ "%
5'; 3 42 '"':372 i]S 8,'2':a3 '2F.~ 7132 E7 '3 56 513 bi 4-$q'--' '.a S ........ 7'i.::~:3 59
. ,-:, .............. 3 _ ~-"-: '22 :~ -i 7' W , !5: 4 ?" 7 -"~ 7"
q... 3 13 S .q,. 13 'l , ,.,a -:: 84- '-.22,8:2 7 3134- , q,. ?., S 57 , R,. l] W 49_ 4 8 , ~_'" q~ S q.. :q 74- , () ,'/t W 7 30 r,._, 17 ?, 4- 7 '"~ 1.4. c... W
'"'=4¢~ 95 74~::t '"'-" ,.; '~ ~.t '""'.:~ 30 ':' '- 0 f:,:':: 4-7 :3 _, 1. :-: W
4 $ 3. 13 ,._,c' 6 '":'..,>c' . 76 o ...., ...... _..... _ ."., 1.3 , ,.,,"-'~ ...... I] 513 .:, , .., :-',. 5 i] . 1. 4-",4 74 ~.,_. ._.'a , _ ,:-._. p -
S '> 2 :'~ ~ 7 .-, .. - ' 13 '.q 'LL..; '7 fi, 7 icii :.} '7 .... 'i
......... ::. .... .'-:, ;"_", b 46 9 c,, 7 57 '::' " ':' 'L I i
...... :. /4. ',-; 4 , 013 W 5 7" qfl ',~ 5 t'-q '~-'-'
,~ ~ . ~) ,, _ . ,., . ~ .... , .,- -
I] , :
8.
2,917
'-,.. $ 12 $ 77 S , I] 1. 86 ':,... ':,..., 2 i 7 .'-:.,.. c...... 5., 6 :.3 ':... ¥ 9., ~ .... i] :,,l - 5 'i 6 7 , ;5 .q5;_ -':".., F,. -:-."' ;:; , F,. ;:; t.,t 76. 5_ 5 , .q. 9_ ti: 4-7 32 fi- 3 ,,,4..
,r, ....... :~ 't '2 ,'"'~, ;q '",:. ',4- . '::l. 7 8 '74-6 . 't. 7 7' 7 39... 2 I] :~,4-'/J , _,t, I] ",.,,tct.. 2 '2 '".,._ . 2 I ':,.. c,., 712 , '2 '2 ",,i 7' 73 ',q_ , 64_, 5} .~- ..."" '"'
6, '" '" ,':L :'" - " ...... 9 P t.i 7 ;q 26 '~ '"' ':' 4- 7 357.. ;':". W
o. .,' , ,.'.;563 (ql7i :9.7°: II] 7U'"' q 91) ?, 4.'.a :i-I} '~,-i F;';7 '~ E,$ .:, .':",/' /'. ....
· . . ',) ,3 , -.' ,_- · ..... ~.L :2' ,, . , . . , ,:2. o-.-' . ,
73 94- $894- :3 '2 ;q731 c 5.~ / '.q13 7 ''~ S 4.'.q .... : o :5'.(, ';
_ ........ . , , " ~ . ,. .... /I] L,! 5..*:35 , 6:{", ... 5 F',4'-.L. ._ , ,.,4- 'W '7'.:i14.. . , 1]'2 c._,4-7 ,.
7, 6 4- $ 8. 9. 16 , ,:4. c.., c. ~ ["i', 3 ,q.. i % .... 79 ta ~a , 7. '2 '3 4- 9., 7 iD W c.., 3. 9. I3 , 67' '.-~ F; 9 0 F~ , F, .... '.q ',4 7.' (:i 9 S , (:~ ..... 9 c., 4. 7 37 ~-, 7. W
275
21') ;'3
4-7 4-
;385
S 64
77 36 ":'"'"'" '" ' 'LIq bi c4_07 '1.'7...' S '.2 ° ".q4- VI ;'502'-:t- 33 47 2.?, 7 W
· .... :J.: z , '7 i c, t? ,4, ':':,., '.q.I. U I] 24 , ii 7 ':',., 4 q. , _ .., ,
"~'q '"'4- 8936 4.6 $8517 6F.', $1]!al 66 t; 49 ,,.'~0 W c-4.51 .i. 3
/.-. .. ........... . . _ ,2.:.iF, Ii .. 2 ;:t!]_'t !. 4-7 .:,:_, 2
80 ........................ 42 F~947 35 o,q6;q c:..q 8lg3 69 S 49 ii3 t.,,t g41-)'L 47 ':, 61]'""":',:.. ....47 W $I.q:::,92 ',q 47 ""~.y .5 ~. ";,.~
80 48 c,- .... :, '" ' " U"'47 45 S 48,4-!] W c~ :3, 9
,5 ,'-J F-, .,:: , 6 ;"~ ,,:3 k; 3 ~'..', '> - "- ,
...... ..:.. ,c ..... h, 5 2 61191.7 9 6 W ,.3247" ,qB, q 47' 41] 3 W
'"' '.q '" ~' "' ,'.I- 8 "-- " '" F, 'v,/ n '..', $ '"' "' 47 ,-i- 1.3 ':1-9W
8 I] 4. '2 ,.':3 '.3 E, "' 2' c:. n 8 ,-, -.~., ,:. ............ - ,:: .,::
o ..... S '" 8 .~ 1] I] " 7 I] '.,.,; 57 F, i r.:,
.... ~. ..-} .,, .... ~ - . . ....r
2,757
2, :3 ;30
t'], 7{._'6,
Cl, 88{,,:
- 20 S- 27-~.
D E F' '['H
'i. 2676
i 2 7 '7 2
I. 2 8 6 S
1. 29 22
L 2 0 5:
'L '.~ 1. ;3 ;3
'L 3223
i. 33 t 8
'L 338 '2
i 3 '4- 4 9
1:34-8!
· 1 2 '- ~, 'l
13 E, 4- 7
'L 3740
DRIFT
OG MN
',81 '? l
,.,,:+
S7 :?,6
· !39 36
',:J 0 4-(3
9 i 6
9 '). 12
9 'L ",. S
9 0 2-'i-
9 0:36
89 6
87 '4-8
87 54-
88 12
m.-', S
R,_.. t.. 0 R. D OF URVEY
T R tj V E R T S U 8 S E A S E C T ! 0 ['.,1 O i R E C: 'r I 0 N
DEPTH OEPTH 0 ! L-'. 'l" ..~.NGLE
8975,32 8::396~5'2 8327,.$5 :.].' ,':I-7~70 W
,':.) ':q ..... ?3 (~ [a, "'::,., S (,-'_1 t3 c,:,~. Ii !:'; 3 .q- 2 '".,::~ -;',,' 73 r_.., 4-7 , 23 I:j bl
89'A:} i° '"'(,:~ ,, 8. 5 q, -.. S "' -
. . , ::, ,.:,.'1.4 3 8 i .... .:...,fl ,,7,7u w
ggc.,~ F, 17j $9'1 q SI] 8c'"'"' J?:3 ,:' 4. ~'' 3"1 W
,~ . ..- , · ....... t .) ,." ,..~ ~ ,' ,? · ,," ,, L.
S994., ¥7 89L!'7,,F.,7 86'Li.3~48 F., 4.8,Iii0 W
cz, .0 ,,';:3 !q.. , ._'.) 5:i. ,...q. ,a,_. 1_ 0 , 4-q... 4 L'". 7 'i. , q- I. <'. 4-7 ,
8987, ;.it 8 '8909, f] ,"3 ,3968, 29 S 4- 7,
8(987,, 32 8908,,52 g(132., 37 S' ;:!.7,,
c;.,J8'7, $0 8908,,'irO 9f]99 .:..¢ :-. 46 I]0
o M 8 ;:.,', 2 o ;'5 F~ 0 1:t .'i ;,4 '" i. :4 I ') l] S '"~ "' 0 t3W
~- 'k2 .. . ,~ , C.' ~,.., . '-r ',]) ~
c ,~ ,- g , :.'j o 'A ! ~' ':'4 :",, (, 13 W
d e.~ ,s 17j ~. 7' 89 '!. 'J ..... 20 ,; ,,' ..,
""" ....... :,.9 .,:,..'.6, .5 21 4-'!- 7:0 W
d ,9 ,:~ 4 ~ 3 (:; >-', (:t 'j_ F5 c ,-'" '-' Ft St
8997, 55 8918,75 9 ."::89,~,4- S ,'-t-:'::, 50 W
RELAT!VE COOROtNA'f'ES
FROM WEt._I_.- HEAD
5 E, 0 E,. 4 !:.~ :,2 E, ! 5 '7,7: 4-
!-.-'1733, F.., I. i~ 6:2 ',.:.{ 6, :39
S 7' '..72., F, 8 '..--:., 5 :?, :ii (:.'~, 'J. 4- W
5 '7' '9 '7,6 'I. '.:.: 6:3; 6 6 ,, ::I- 9 W
.ct84-7,9:3 S 64. '.22, il)~3 W
59i:3, 87 5.. 649.4-,".5,5. W
q',5~7"4 ;;'t:] ': (.,r.:~.- , .- ,,
,... --,- , ........ i:, f3 7 .J '..-,;
F, fj39,6'L '.:; F:,630, 20
6083, ':.:' (':~ '.:.. 6 E, 77, 0 't.. W
6129, :38 S 672%,60 W
61.5!.~80 S 6748,~:2 W
C, 201_ , i] 7L :3 6 "7.. ,a,_.o~,-, I_ ~, ~,~,
6268,9C, S 6865,86 W
63:75,99 S 6930, 25 W
(.., t_ 0 .:., t., R E
O ! '31" A lq C E O i3 F'iN
8:32'7,67 S 4'7 4.0 [59 54
84.22,96 53 4.7 41] 5i W
85!5,7:..', '.5:47 411t 4'4- W
8573,7i S 47 ."~0 40 W
861.13,7'i. S. 4-7 4-0 39 W
8685,'70 S 47 ,ti.O 4-5 W
8783,68 S 47 40 46 W
6873.66 :.:i'4-7 40:34 W
8968.64- '.347 ,'I-0 S W
(:1133'2 F,,2 S .... 29
. . _ ,e .... 5 1
9099,i!,2 S 4. '7 39 20 W
',.:J!31, 58 S 47 3g 53 W
9201,'48 :3 4-7 3'7 48 W
9297, 30 '.:1; 4-7 36 7 W
9390,05 S .cb7:33 F.,:3W
DOG LEG
d e 9/' 1 00
2. $90
2 ~ t. ":? 2
3 ,, 7 ~575
0. 102
i}. 9/4. '7
2,6 '::.it 'L
"~ 4-17
0 .. 9B7
l., 56 0
13,
'1. q. ,.~c' ..,,:: 'A_ ,.,° ,.Fi .~.~. '"z ...... 9 0 i] I] '2 ,'E; ,.q .... 9 '"'.. '1 ......., .'-'-; 5 (q '4 7 8 :?. i '5; 4- 2 ~. 13 W C, & Iq_. l] , 5 1_. S [5 g Cj l , ,i, S W I-'t. ,:t~ 7.'. ::~.., '-'/o'"' S '4- 7 3 i 3. 6 W I] , Fl_ n n,
0ATA
[NTERPOLATED FOFI
E V E N
FEET 0F SIJBSEA
OEPTH
M E A ',}.
0 E F" T l--I
t 7/9
2 '7 g
?; 7 '/:'::
'q-751:
% 79
67
FSi}
i 'L '.{ii 4.
1. 3 I] 'L
1. 4-l] 9
'L B'L9
~ .744-:
L
· i ,a,_, 8 '.2
2 ~Lr}6
? '£ 7; 5
2366
1.."' 5 ~} 'L
264-0
'._"i .,'7" c~ -'
2 ',"_~ 2 8
38 '74
'",,/ER
P 'T H
79
I. 79
2 ? !.ili
3 ¥ 9
4.7'
c,.., 7' '...:i
8 7 9
S
',? '7 77!
i. 0 ¥ 9
'L !79
'i. 279
'L 3 '79
i. S '79
i679
'L 879
! 9 7 9
'.i' 17
;." 279
2379
'.2
'~ L-'~' r,'I
? 6 ¥ g
2 7 7 9
2 8 7 9
'..] '/J '7 "'i
?,.; U {:) S E A
D E P T H
zl-0 ii
70 ti
'L 2 0 0
I. 3 fi I]
1. 6 0 t]
180 0
i. '?j i313
2 I] O P
2 1 I] I]
? 2 0 0
'2 3 0 0
,~,
..:: 4 i] I]
25 fi fi
2708
2 $ 00
2900
14D - T V
0 T F: F ·
i.
".4,
i. ii 3
'i 27
156
187
222
26!
4-42
4,89
,6 .'1,
VERTICAL
(30 R. R E C T
I]
0
RELAT!'VE C'.OOROtNATES F R C! 14 W l:-.-] L i_ - H E A 0
0,88 t,,t 0,!]0 E
I3, 130 N I],1313 E
i3,130 t',.! i],r]o E
!3, 1313 H 2, (]0 E
i], I]1] i'..1 Ij ~ ill!()
FJ. 9 9 '/.-; '!... 7 '! W
o -' '" '} :ilr
,:.,, i. 7t~ ,.:,
~3. 22 S F,:6,3 Yl
3, 7!4 :S 2(), 8 ;iL,'. W
2, :37 :-'.; '355, iT! :3
c ?" '.] i..] T, '.'5 c' c F,!'q
.5 96,87 S 78,71L W
7 'i '.:,2.,. Scc ' 0" ,
......... 'i. .3 ' 1 w
8 '1_ 554,6 i .... ,.--; '.1. ":', 1_. 2 P_ W
i0 l.S',a,, 3'1. S ':F,:] 2r':, t..l.
i. 3
17
2i
24
3 1
39
'1-4
46
47'
47
48
22
3 6
35
4 !]
2.56 5; 'L97,74- W
17 7" c :, o ,
_. c: ,; ?_" ..... 2 i-},
:},96 S 27'S,7F., W
2. S :} '..;. ::'. '2 4, ',:J 6 W
6, :37 t."¢ 375. 2'3 ',_4
46
66
7 3
C, il, 03 ti: 7(,5, 14
C8S, 83 ::,. 84-.L,;'}2. W
959,65 5 9].7,67 W
l. tTi:39, 20 t:} 9'.31, ~-]~7 W
i..'L19,117 S I.)](5%,83
DATA
INTERPOLATED FOR
E V E N
! 00
FEET
0 F
S Ij B S E A
0 E PT H
M E A S,
DEPTH
..., ..... , ,.
· 4527'
4667
4.8 II
-'!.9 44
522!
5505
r-
:;6-.,-"' 7
579 5
,5944
K, II 95
6 246
6 :}99
6%61
67 ti 0
699 '..2
7 'L '~ 4-
7276
7' '4- i S
7558
'7 & 9 '7
78:3(,
TRU VERT
DEPTH
:313 '79
3179
337' 9
34-79
3 S 79
37'79
387' 9
4-079
· 4. 179
4279
4379
4479
4579
4679
'$ 779
4;'-)79
4979
5 '?_' 7 ':'
5 379
54.79
c 6 '-7., ,.]
5779
5979
SU8 SEA
DEPTH
,> ,j I.-I. t"j
3 ! O 0
3200
,~ 1313
:3 4- O 0
3500
36 ti 0
3700
3800
3 900
4000
4200
4 } 0 0
4400
4- 5 i] 0
4.6
470 O
4-8 I] 0
500 O
$1. 0 O
S 2013
S '= i] 0
5400
% c 13 I]
S I{, I] 13
57013
5800
5',30 t]
M D -. T V O
0 [ F F,
.-rs_, 8 c:
c::, 3 I.
(576
'7 ? ''~
,.u. /_
'7 i"}
,,,';
9 '.:2 $
i. 0 i] 3
!042
1084
1126
1168
1 '216
l :} 'L E:
1:367
i4'20
1.472
!521
i567
i61:3
1655
1697
1 ~ 39
,/
1779
1818
VERTICAL
i.'} C) R R E C T
4.8
46
4-5
4-6
4. 3
4 ],
42
4-0
:38
:} 9
3 F~
29
,"4- '2
42
42
48
'$ 9
%1
C '%
52
49
46
42
42
4-2
4-13
39
39
RELATIVE COORDINATES
FROM WELL-HEAD
'.L t 98. E, ,:'-'.. S '.L 139, 51
1'277, t. 5 S 12'L!,52
135 S. ~ ,,a. 6 ~ 1.~ ~'" 8 '2 , i_ '.:'~..
11';5 1. 7' c 'L3S'I f.:',t.
1.50'J., 2'L S i. 43:i., $'L
'1. q -7..,. :5;., I_ I] t':, 'L ~':,.,. 02 , 2 i;: W,
'I. F.: ."-'b 4 61. "-" 'L < ,v 1 !a 'j. W
'17'}_0, t8 '3 'Lg4-4,82 W
,~ c, ~':.' q 9 ':' ',:~ 'L '7;' '[ 3 ...i ] W
,_ .; ,,. ,.. ~.;
i;':~43,F:8 S i78i.,48 W
1910,30 S 184-9, 04- W
197:3,60 S i920,4-:3 W
204.2,95 S t991,08 W
2115,63 t~ 2061,6F/, W
2191,62 S 2!32, :L1] W
'..-'._ ';'_ 44 , ID 2 13 2 '2 .., ') I_, 8 ID W
232'2, [~0 :-'., '2307,'7~5 W
...24 l] ,.-q, E, 2 S 2384-, i'] ~';
74-89, !7 S 246'2.7'2 W
... ...... . , ._, '...':-,4-13,67 W
2652,75 '.3 26'24.6E, W
2726,62 '.:5 2706,6t W
2798,C, 6 ::; 2785. 50 W
2869, 1':-) :.,~ 2864, 25 W
2938, i7 S ...29:,.',9, S'LW
31]07,57 S 3012, 33
31376, 85 1-] 3083,89 W
314-5,66 S 3153,82 W
3'2!3, 19 S 3224-. 15 W
:} 2 i':: I]_, 16 ':.,. 2., ')~_ g_ '",-. ',q, 4 W
INTERPOLATED FOR
]. OO
FEET
0 F
qltB :'EA
0 E P T bi
A '.-],
P T H
7974
,$ 'k I. 2
8808
89.48,
9088
7{ '2 ')
9:366
9503
9640
',q 77 c
99 !]9
1. 084-3
'k 0 ~ 77
10472
10806
i 0976
1_ 'l 3 '16
11454
1. !644
I. 1802
'L 1972
12.,_'"' 07
1271)5
VERT
El P T H
6079
6 ! ':79
6279
K, :'~ 7- 9
6 4 Y' St
6679
(-.-.,7'79
6979
7 ii 79
7179
'7 '~, ~7 ¢".
./ L_ ?
737t-)
7 '-q-, 7'/)
7 57 ;.:')
777':-)
,-., 79
7'979
~:.'.'. % '79
,-, '"7 '--'. C~
8 S '79
SEA
T H
O 0 0
'L L] 0
2 0 0
:3 0 0
6500
6600
6 '7 I] 0
69 t} 1]
700 II
7100
7200
7300
7400
75 i] 0
7600
770 ii
7800
7 90 O
800 !]
;:: 'i I] 13
820 i]
S 4. O I]
,3 '-], 0 II
87 I] C
S :C: 0 II
P'I 0 - T '4 D
01 F F,
_ 0,0
1. 9 :.13
'L ':.-} 71
20 'L 0
2 Ci S 0
'; Ii ~-]
.'.L
2 ')_ 29
2 :l 69
.~
2 '24- 8
'2 :.2,9 7
· .'" 2_ 24-
236 i.
· " 3 96
'2430
2464
"..' 4 '.-)
· -', c, ::~ ,,ti
'2S93
'2,6 c 8
2727
2797
2868
2 ';J 37
VERT i !?. AL
C' 0 R R E C: T
3 $
28
35.)
40
4-!]
'39
34-
34
4-t
54
69
70
7t
6
7 I]
'L 3 5
3 9 8
,~°. E L A T i ",/'E C i) 0 R. 0 I N A T F_'. S
F P. Iii ["t V,.I E L L -- r t E A [)
3:345.- 54- :~ ...,..:("31,73 W
· :, 4-1 'k,. 37':,., ,.'; .¢ '",.. '.,:.~. , 9.. 7 W
3 .':'i. 7 fi,, 73 c.., :'~ 4- 99 , -~......v., W
37;; 43, ',..:.~ 3 S 3 S 6 9. :-:: t]bi
3(,!2_, 3:} '3 3~.:,38, I.!~ W
,:- .lO, ,:.:. :.-..i t. 2 c
2. (--'~ 2 (], 3 '2 :._:,
:.:;8,S0, :3~ W
:; 94. 'J_ ,. 7 t3 i,..l
..',L l] '.L 7, 'l. 6
409i.,8'L W
.4-235, 13 \,l
4-309, 'L3 tX
4378. ;::2 W
46 '1. S. 1! ~'3 t-'..
Z. TSt, i_C, ti:
4 iii 5 ':'). , 4, 8
~-':)33,4S :!.
'q-S 99,63
~ !_ 22,6 ('l
'.-'52:3.%, 63 ',,./
~'.347, 2i3 W
qc,'~c 7"7 5;
OATA
[ iq t- E P... P 0 L A T E D
F 0 R E V E N
FEET OF
MEASURED DEPTH
M E A S,
L3. EP TH
'L 00 0
i_ 2 0 0 0
'!. :3 0 0 f3
]-Rtj '",/E R. T
f3 E P T tq
-'i-
, ....
-"!- 0 i9
'-$7!7
.7 !5 ¥'7
:_~ E A
,OEPTH
9 !. 5
549
2 3 0
394-~3
4-63 8
5306
67:37
7' 4 E
8 ! 1 .,%
0"-7 ,,~o
'K) ,,' ~L
8, 9 1 c
R E L A-I" i'VE
F: R, 0 M
3 E, !3, 1 1
c~ zl."7 ,:t. '7
'!. 3 C G ~ ,..,':' 6
I '~ _ , ',:J 2-,
_,.:. :7 ri 3
3 3 c:,., '7' ,, '.,:~. :?,
4 2 4'F,,, 9 I]
.'7 ! 1 ,, 9 6 ".-:
i.,?,.¢ ~ 58:5
'.'"'-; 8 2 4,4i :5
¢: 0 C', R 0 I N A T E S
WELL-HEAD
:39., 2.6 W
:'.: 3 2 ,, !39
'!. 3 t373, '? ',:.";
:3 3 '¥ 4 ~ 6 i. ",,,i
3 8 S $, 7 '7 W
56 6 8, :2 tD ",,.,,'
F, 396, '!.'7 W
~ark~r Iden~lfic~ion Mil
A{ KOP 5OO
B) ~13 i38~_q
Form to 'be inserted in each "Active" well folder to check
for timely compliance with our regulations.
OPERATOR, WELL NA~E AND NUMBER
Reports and Materials to be received by:
Date
Required Date Received Remarks
Completion Report
Well History
Samples
--
Mud Log
Core Chips
Core Description
Registered Survey Plat
Inclination Survey
D~recr~onal Survey
Drill Stem Test Reports
Production Test Reports
, ,
Log Run
Digitized Data
/
Standard AlasJ~a ·
Production Corn
900 Eos! Benson ord
P 0 Box 196612
An(borage. Alaska 99519-6612
(907) 564-5111
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TO: TEXACO
MARATHON
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
STANDARD
AL ASKA, PRODUC 1' ION
Date: 06/24/86
Ti: 77143
SAPC OPEN HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of this letter and returning It to this office:
DAL/UNIT/STATE:
Y-20
Y-21
Exlog-Formation Evaluation log
Exlog-Formation Evaluation log
05/12-25/86 12170'-13866'
04/14-19/86 10900'-]1630
STATE ONLY: . DI~J~TI 0NAL 'SURVEYS
Magnetic Single"Sho~"'~D%.~ec,~onal~urv.~y D~te:
Gyroscopic D-i'~ect~'n~]~"Su.r~ey//~ /.-'" D~te:
.x'
Job//'
Job# '
Victoria Aldridge LR2-1
INFORMATION CONTROL
Wel I Records LR2-1
Standard Alasl~a .... .
Production Cam
900 East Benson ard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-51 I 1
INDEXED
TO:
REFERENCE:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MARATHON
MOBIL
PHILLIPS
OF ALASKA
GEOSCIENCES
SA]PC FINAL DATA
STANDARD
ALASKA PRODUCTION
Date: 06/13/86
TI: 77113
The following material Is being submitted herewlth. Please acknowledge recelpt by
slgnlng a copy of thls letter and returning It to this office:
Y-20 TELECO MWI) Gamma 8700-8990 5" 05/24/86
Y-20 TELECO MWD Gamma 11850-13865 2" 05/24/86
Y-20 TELECO MWD Gamma 11850-13866 5" 05/24/86
Rece I ved
Date
A u,,,t ol the ongmol St~:~nlJ¢~rzl C~l Co,npony
Foundect ,,, Clevel¢,,,(I 0~,o ,r, IH/I)
Victoria Aldridge LR2-1
INFORMATJ0N CONTROL
Well Records hR2-1
MEMORA' 'DUM
TO:
THRU:
FROM:
Sta"- of Alaska
ALASKA O~_. Al-iD GAS CONSERVATION COI~. .JSION
C. V. C~~~'ton
Chairmar~J ~_.
Lonnie C. Smith~
Commissioner
Harold R. Hawkins
Petroleum Inspector
DATE' May 8, 1986
FILE NO.: D. HPfH. 23
TELEPHONE NO.:
SUBJECT:
BOP Test
SAPC Y-20
Permit 86-84
Prudhoe Oil Pool
Thursday, May I, 1986: I left DS ,I1 where I was staying to go to
standard Alask~ production Company s Y-20 (33-5-10-13) to witness a
BOP test. There was one failure, the IBOP on the top drive. (See
~-=ield report.) i filled out an AOGCC report which is attached.
In summary, I witnessed the BOP test on SAPC's Y-20 that Audi Rig 2
crew performed. %~en the IBOP upper Kelly was replaced and tested,
the tests were satisfactorily performed.
~02-001 A ( Rev 10-84)
5/84
Inspector
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Well
Operat°r~Y~D/~/~Z) _~/,, .z~//"/~ ./:7/~Z~Z?/2~(7~OZ'" /,"~:)' Representative ~.~
Well k/ ~0' . ~ ~-~/0~"/~) Pe~it ~ ~--~
Location: Sec 'f.J T//~ R//~ 6:M / asing Set
Drillin~ Contractor ~ 6//2~ Ri # ~ Representative ~~'~
/
Location, General ~ ~ Well Sig~/( ACC~LATOR SYST~
General Housekeeping. Oil Rig
Reserve Pit
Mud Systems
Trip Tank'
Pit Gauge
Flow Monitor
Visual Audio
.. :/:
Gaf Detectors
BOPE Stack
Annular Preventer
.-
,.
Pipe Rams .
Blind Rams
.i -
Choke Line Valves
Test Pressure
Y-~F.'2 o
~o 0
-'.. H.C.R. Valve
Kill Line Valves
Test Results: Failures
Full Charge Pressure _~.~?0'0 psig .i
Pressure After Closure ./~0 psis
Pump incr. clos. pres. 200 psig. --'" ~in~Osee. ~
- !,
Full Charge Pressure Attained: ~ min~O sec.
Controls: Master ~ff
Test Pressur~ ,~000
Test Pressure.
Test Pressure
Test Pressure,
Test Pressure
Remote O.~ Blinds switch cover~M~,..
Kelly and Floor Safety Valves
Upper Kelly
Lower KellM
Ball Type
Inside BOP
Choke Manifold
No. Valves / /
No. flanges ~ ~
Adjustable Chokes ~-~/.~
~drauically .operated choke ~/.~- ~'~
Test Time ~ hrs.
:.
Repair or Replacement of failed equipment to be made within ~ days and Inspector/
Commission office notifie~.ffo?~t~jt/~
Remarks: ~ . . Phz7 ?A/x. fD._,
Distribution
orig. - AO&GCC
cc - Operator
cc - Supervisor
Inspector
_
April 25, 1986
~ . A1
~r. R. S lan
District Drilling Engineer
Standard Alaska Production Company
P.O. Box 196612
knchorage, Alaska 99519-6612
Telecopy:
(907) 276-7542
Re: Prudhoe Bay Unit Y-20
Standard Alaska Production Company
Permit No. 86-84
Sur. Loc. t440'81'U.=, 347'~;~L, Sec. 33, T!IN, R13E, ~-.
Btmho!e Loc. 2830'S!~L, 2500'WEL, Sec. 5, T!0N, R13E, l~{.
Dear Mr. Allan:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indemnify you from the probable need
to obtain additional permits required by law from other
governmental agencies prior to commencing operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hours Prior to commencing installati~n of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. ~ere a diverter system is required.,
please also notify this office 24 hours prior to commencing
e~uipment installation so that the Commission may witness testing
b~fo~e drilling below the shoe of the conductor pipe.
'~. V. CbZ~tterton Chairman of
Alaska Oil and Gas Conservation Conzmission
BY ORDER OF THE CO!~MISSION
dif
Enclosure
cc: Department of Fish & Game, Habitat Section w/o enc!.
Department of Environmental Conservation w/o enc!.
Mr. Doug L. Lowery
STATE OF ALASKA
ALASt. ,...,_ AND GAS CONSERVATIOI,
PERMIT TO DRILL
20 AAC 25.005
,, , ·
la. Type of work Drill I~: Redrill Iq,I lb. Type of well. Exploratory C Stratigraphic Test [] Developr~ent Oil
Re-Entry ~ Deepen'~1 Service [] Developement Gas [] Single Zone ~ Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Standard Alaska Production Company 80' KBE feet Prudhoe Bay Field
3. Address 6. Property Designation Prudhoe Oil Pool
P.O. Box 196612, Anchorage, AK 99519-6612 ADL 28289
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
1440' SNL 347' WEL Sec. 33 TllN R13E UM Prudhoe Bay Unit
At top of productive interval 8. Well nu ,mber Number
1896' SNL 1459' WEL Sec. 5 T10N R13E UM Y-20 (33-5-10-13)PBU K00683449-G-14
At total depth 9. Approximate spud date Amount
2830' SNL 2500' WEL Sec. 5 T10N R13E UM April 28, 1986 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth(MD and TVD)
property line
2500 feet Hurl St. #1, 2500 feet 2501 AC 14278'MD 8930'TVD~t
16. To be completed for deviated wells 46.11¢ 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 500 feet Maximum hole angle 0 Maximum surface 3300 psig At total depth 0'VD)8600 TV]~ss psig
18. Casing program KOP #2 90° 11083' Settincj Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
26" 20" Conductor 80' ~urface - 110' 110' 8 cu. yds concrete
17~" 13-3/8" 72# L-80 Butt 3077' ~urface - 3107' 2680' 4316 cu. ft. Permafros
12¼" 9-5/8" 47# L-80 Butt~/ : 1273~' ~urfac¢. - 12813' 8971' 860 cu. ft. Class G
NSCC
8~" 4%" 12.6# .N-80 .FL4S ]~64' 12614' 8938'14278' 9010' Slotted, uncemented
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured
true vertical
20. Attachments Filing fee ~ Property plat ~: BOP Sketch ~ DiverterSketch ~ Drilling program ~
Drilling fluid program~ Timevs depth plot [] Refraction analysis ,~ Seabed report _~ 20 AAC 25.050 requirements
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
~ Signed ~'-~. C..~. (~.~..~_ Title b,,l~., ¢,,,.~ ~,q.,~.L,,,ar.. 6.~(.... Date
Commission Use Only
APl number I Appr~v~/CzaCe/ I See cover letter
Permit Number ,.~)~.;~;~.- 50-- ~;~-¢" ~/.¢-~~ 86 for other requirements
Conditions of approval Samples required I~, Yes ~7...No Mud Icg required ~ Yes ~ No
Hydrogen sulfide measures ,r-q Yes ~ No Directional survey required ~Yes ,~. No
Required working~C~.~P~~M; ~ 10M; ~ 15M oY~
Other:
- by order of
Approved by ~ '/ 'k~ ~/~//~'. ~;4 Commissioner the commission Ddt .
Form 10-401 Rev. 12-1-85
Su/~ ~ triplicate
PROPOSED DRILLING AND COMPLETION PROGRA.P.I
Y-20 (33-5-10-1 3)
Install and cement 80' of 20" conductor to surface. Drilling fluid pro-
gram will consist of an 8.-5-9.5 ppg spud mud in the 17-1/2" hole, a
9~0-9~7 ppg water-based mud in the 12-1/4" hole, and a 9.1 ppg oil-based
mud in the 8-1/2" hole.
Drill 17-1/2" hole to KOP #1 at 500'. Kick off and build angle to
46~1°~ Hold angle and drill to 3107' MD (2680' TVD). Cement 13-3/8" 72#
L-80 Buttress casing to surface.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe
rams, blind rams, and annul ar preventer. Maximum possible bottomhole
pressure is 4390 psi at 8800' TVDss based on original reservoir pres-
sure. Maximum possible surface pressure is 3300 psi based on a gas col-
umn to surface from 8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12-1/4" hole to the 9-5/8" casing point 10' TVD above
the Sadlerochit. Hole angle at this point should be 82°. Run 9-5/8" 47#
L-80 Buttress/NSCC casing to within 5' of 12-1/4" TD and cement in two
stages: First stage using Class G cement around the 9-5/8" shoe. The
second stage to be downsqueezed in the 13-3/8" x 9-5/8" annulus followed
by nonfreezing fluid.
Change over to oil-based mud.
Directiona!ly drill 8-1/2" hole to start of horizontal section at 9010'
TVD BKB~ Drill 1000' horizontal section. Run drillpipe assisted open
hole logs~ Run 4-1/2" slotted liner, and hang from packer/SBR inside
9-5/8" casing, Displace mud with NaC1.
Run 4-1/2" internal plastic coated tubing with GLM's and a sliding sleeve
and land on polished riser. A subsurface safety valve with dual control
lines will be placed 50' below base of permafrost. Install and test Xmas
tree~ Displace tubing to diesel through sliding sleeve.
Tubing: 4-1/2" 12.6# L-80 A/B Mod. Butt. IPC w/7 GLM's
DA¥~/O532D
20" Conductor
pRoPOSEDi-DOW~MOLE DIAGRAM,
WELL Y-20 C33-5-10-13)
PROPOSED DEPTH
BKB
110'
Ball V~lve
2140'
13-3/8" Casing Shoe
17-1/2" Open Hole
·
3107'
.
3127'
4-1/2'" 12.6f~ L-80 A/B Mod. Butt. Tbg.
4~lZ2"x9-5/8" Washdown Liner Hanger_ 126~4'
with Packer, 'SBR, and X-Profile
9-5/8" Casing Shoe
12-1/4" Hole
4-1/2" Liner Shoe
8-1/2" Open Hole
12813'
12818'
14278'
14278'
TACK
I;5
5/8"
TRIPLE RAM
tRATION
I
STACK
5000 PSI WP
DRILLING
ANNULAR
PREVENTER
PIPE RAMS
BLIND RAMS
CHECK
2" KILL UNE
HAND
GATE
GATE
DRILLING
SPOOL
4" CHOKE LINE
HAND
GATE
HYDR. ASST.
GATE
PI PE RAMS
I I
i000
2000
3000
4000
5000
6000
7000
8000
9O00
I0000
11000
12000
13000
14000
-1000
VERTICAL SECTION
SOHIO PETROLEUM COMPANY
Y-20 500 FT KOP
SECTION AT S 48.10 W
COMPUTED BY RADIUS OF CURVATURE
SCALE : 1 inch = 2000 feet
DRA~,~N : 3-12-86
' : Warker Identification ~ T~ D£?RT
A) KW 500 500 0
.) .AS£ P£RwAIrROST ZIeZ ,OZO 577
c)
^ -- ~)u~u s,z, ,o,o ZTOS
~I K~Z ,,os~ sZo, 7001
~uZ.o ,.~ ,.. /,oo ,, ,) SAC ,Z~,
R~ SHUBLIK 12~4~ 8850 8171
A~!JA~ ~1 ($,il de J) $~L£ROCHIT IZ874 8~81 8585
K) T~T 1~78 J00~ B~88
L) TO 14Z28 ~00~ 9~88
¢'~ AVLKA~
0 I000 2000 3000 4000 5000 6000 7000 8000 9000 I0000 I I000
Deporture
t04
02
05
Y-22
(Proposed)
600
---~
OZ
32 o'-- --~
05
04
OI
Y-20 (Proposed)
21
I0 ZO 30 40 .[ I0 2/)
22
30 40
~ (Actual)
I
(Actual) ~071'
. ~ Y-2 (Actual)
Y-6 (Actual}, I
L 3 83' J
NI- ' ' -I
~Actua I ~ I ~ I
(Actual) tRc~uo~ ~e~ ,
Y-19 I I LAT. = 7~°~6'05.61''
(Proposed) ~ I LONG-= 148°49' 21'96"
Y-Ii Red~ill (Actual)
(Actual)_ _ 2492'
,,
._~ ~ ~ 17'
__ 2780' ~ (Actual)
4 Y-21 (Proposed)
PORTION OF
TIIN, RISE, UM
SCALE I'=l/Z MILE
CERTIFICATE OF SURVEYOR
/
3170'
al(Actual) !
T. II N.
T. ION.
'o ,
2226' :-I
Y-8
~ (Actual) I
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska and that this plat
represents a location survey of the wellpad shown and the wells
thereon. This survey was mode by me or under my supervision--
and all dimensions and other details are correct. Bottom hole
locations are furnished by others.
·
Date Surveyor
NOTE: All bottom holes are 8800' sub sea.
PAD DETAIL
SCALE 1"=:500'
($4-~-I1-1~) · Y' /
(~$-~97'-I1-15) · Y-~
(/4-ex-//-/3) · r-3
(43-Za-//-/3) ~ r. 4
(~3-~8-//-/~) ~ ~-~
OI -
(~- $4-//- I$)
SUMP
- 05-/0-
(I/- 05 - I0- 13 )
(4.~ - zg- / /-
(~i - $$- I/-I$)
(2/- 4-/0-
(33 - $$-//-/3)
eY-8
ieY-9
-La y_/o
-.l~-t
-~ ·tr.t/
O2
0
Add Proposed BHL Y-Z2 2/24/860~-,
Add Proposed BHL y-Icj ~ Y-21 2/20/86~;
Revise BHL Y-7,8,9,10~12,8, I~J from Proposed toActual 10/20/81
Add Proposed BHL Y-I$ 7/14/el
Add Proposed BHL Y- I0 4 / ~/81
Revise BHLY- 5,4,1~ II from Proposed to Actual 4/ ~/el PdR I
Add Proposed BHL Y - ~ ;5 / ZS/el DI.fO
Add Proposed BHL Y-8 5 /2 /BI PdR
Revised Proposed BHL Y-7 2/2 /81 PJR
Add Proposed BHLY-7 I/Z8/81 PJR
Add Proposed BHL Y-12 10/9/80 PdR
Add Proposed BHL Y- II 9/26/80 PJR
All Bottom Hole~ ore 8800' sub sea.
Revised BHL Y- 1,2,5 ~6 from Proposed toActuol. 6/25/80LAB
NOTE~ Plat dated Aug. ~4:),1979 changed to Oct. 2,1979. BHL
1~5 & 6 changed.
C.J.R.
I i I
AS- STAKED
PAD "Y"
Located in
NE I/4 8~ NW I/4 PROTRACTED SE.C: :5~ & 54~T. IIN.~R.13E.~U.M.rAK.
Surveyed for
'SOHIO PETROLEUM CO.
Surveyed by
F.M. LINDSEY ASSOC.
LAND ~ HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
II Im
Uarkcr ]dcnlifical'ion I~D TVD DEPRT
A) K0P 500 500 0
§) BASE P£R~,L~.FROST ZI6Z 2020 577
C) END BUILD 2344 2151 703
D) UCNU 5~26 4oao 2708
E) BASE UPPER CR 7615 5805 4502
F) LeU 10248 7630 6)99
~) KOP 2 11083 8Z09 7001
H) SAC RIVER 12383 8871 8107
I) SHUBLIK 124¢9 8890 8171
J) SADLEROCHIT 12874 8981 8585
K) TARGET i)278 9009 8988
l) TO 14278 9009 5988
HORIZONTAL VIEW
SOHIO PETROLEUM COMPANY
Y-20 500 FT KOP
CLOSURE: 9988 ft S 48.1 W
DECLINATION: 0 de9 E
SCALE : 1 inch = 1400 feet
DRAWN : 3-12-86
700
700
1400
2100
2800
3500
4200
4900
5600
6300
7000
7700
8400
9100
7700
7000 6300 5600 4900 4200 3500 2800 2100 1400 700 0 700
--- Closest Approach Analgsis ..... ,
.
.[2.a ..t,...e...', ...... Z .-. :..A_ ?..B .c_8._6.
Sem~ch R~dius= 3800 COURSE LINE :
Location = W-E S.-N TVD(SBS) (
T o p 6f~4470, 00 ~%4~8.~?? ..OB ............. ~.O.Q.,...q.{~ ...............................................
Bottom 638334. 36 ~943096. 9~ 9458, 1~ T ............................. ~ ................ .............. ':T:'='F'-'ZT ............ ~"" ................................................. ..................................................................
~ o t ~: A i i .d~ p.t.h.~._ i ~..~.~..~:~ ~.~.~l o ~...~:~i.~. ~.%:~:% '.i~:~.l...:. .......... ...;..L_.,.....~..._J ......... : ...... :,:,:..,~-._:: .......... ;~;~ ........ ~ .................. :,:.:-=~-:~:~:- .......... : :'
.
.
.......... ~ ~_~ S.~._6P.~.!_~.A~ h ~ _~.e.~.~.~/,.,,..I~.~._t:~.~,~..~.i.~.~ ................................ . ................................................................. "
WELL IDENT /PROPOSEDX : /NEARByX CLOSEST :: :'/PROPOSED~ /NEARBYX VER
TVD DEPART ' 'TVD DEPART DI~ANCE TVD DEPART TVD DEPART D I~ TANC~
3311i3 3224. 6 1810. 5 3185. 1 11. 1 1667. 1
-,' .~ ~...'
AO=.9-,,.O0,,, O0
~U~L 1 9~e. 1 ~3e~. ~ ~36. 4 O. 0,~ zS]~? ~ ........................................ ::7~'
. .-
A0~9--~00~701 ~' ' {~ ' ' "
.HU~L _ ~ ~,..~.: ....... ..... ~.e~..? ........... ?.~6.; ..................... P..,.P_.:; ............. z.~¢.,~. ~
A029-200670(}
STATEI 4755 0 3409. ~ 4747. 0 O. 0 5~55. 1
A()29-~039400 , ...................... . ' '
Y-; 98, 6 O. 0 I00. 0 O. ~ 1134; 4
Aozg-2039500 ,
Y-2 ~8..6 ....... O..0 t.~ ,. ~ ~...~_:., ........ 10.8~..~
A0~9-2041 i00
Y-5 99. 4 O. 0 100. 0 O. 4 914. 9
Y-4 99. I O. 0 100. 0 O. 5 805. 3
A0~9-Z0431 O0 ?: (
..~,.
.... 0.. 0 .... 0... 0 ......... 0 .,.. 1 ............. g~,.. q ............ ~_~,. 3 ................................................................................................................................................
· Y-6
A0119-2043600
^o?~-7o513oo
· y,il ......
A0~9-~051301 Y-I IRD
^o~9- ~o.~ 1706
Y-i 2
MPTR43 ~282. I
A029--2056000
Y-7 500· 0
Y-8 500. 0
A029-2057900
Y-9 393. 0
A0~-2058700
Y-IO O. 0
A,D:~9-2063~ O0
Y-13 1332. 0
..
Y-18 O. 0
AOgg-g09~O00
Y-17 493, 4
Y- 16 ~00. 0
~0~-~0~4000
500. 0 O. 0 501. 7 4. 6 693. 3
..... 6-. '6 ....... 67 6 ............. g.'~ 67'~ .............
500..0.. O.O .... .5_0.7.. Z .................4.=.5. ......... ~_0."3 4406. 5 3047. 4 9396. i 3077. I 4'78~. ~
i082. 4 75. 5 108~3. 7 ~. 7 ~6. 4 I~S3. 2 i3:S C, ~t:',97. '; 81. I
4
7077. 0 5~,33. 7 ' 1530..4
o. o 5o9..;~ ............. ~....~ 7
O. 0 ~,07. 7 O. 7
"6;6 ~o0'.' 6 ...... ~-'?
O. 0 .5. 7 ...... 0..0 ............
l~.!,. ? 1337. I 4. 3 ~;~,~. i
o. 0 3. Z ........... 0;6 ........... i~..c s .............
The ~ll..~.hi~h ~omes ¢l~se. st..to...~be....p~.op.o..sed_~ell.....i.~z ................
A029-2051~01 Y-llRD
Closest approach distance = 30.~ ~eet
~iCK OF~ ~o~, this run ~= 500.0 F~t '
..... Closest Apr..'romc' Analqs,,~
................. Da.re.. %rA[%~,--:86_ T~F:e.,:..,..13 C2:
.................................... ~ ................ r.:y-~7;7~ ...... ~ ..................................................
Sea. ch Radius=.'3800 7 DE~RE'F LEAD LINE
....... Eo.r....p p..o.~..~ s e d....,,,~l.h'. _Y_-_~0_~_[~41.-__5 ~ lO _-. 13 ] .........................................
Location = W-E S--N TVD ~ SP,,c; )
_Top ................ b.z~ 4.~.7 O~...O0 ......... 0.9..~ B.DQ~..Q.O .................... r. SQ...00 ................................
Bottom 63907b. 84 594~391 26 9458. 12
...... Note; .....1~11_ d e p~.~.h.s._ i,o.:..ffee**t..:..I~.el ~ ~_.~ eil.u._. B u.s h in~___(.B ~B) ........................................................
...................................................................................................... C.i~ s.~.~.:t,.. &p.~.r.~a nil ...................
NELL IDENT /PROPOSED\ /NEARBY\ CI..OSEST
TVD DEPART TVD DEPART D1 ',:., TANCE
A029-2001000
331113 30[-23. 4 1609 3 ~994. 4 7 6 ~75 9
HURL i 9538. i 838~. 9 9536. 4 O, 0 Z'~9. 5
A0~-~006700
STATE1 5~40. 3 3914 3 5~!3~. 3 O. 0
Y-1 ~B. 6 O 0 100. O O. ~
AO~9-'~039500
Y-2 .......... ~8.,.6 .............. O, 0 ..... 1.O0, 0 ........................ 0..~ .........
~0a~-2041-i-~0" '
Y-~ ~9. 4 O. 0 ~00 0 0 4 ¢14. 9
Y-4 99. 1 ............................................................. 0.0 100. 0 6'.'-~ ................ 3~i '3 .......
A027--~0431 O0 -
Y-~ .......................... ~.._~ ............. 0 _0 ............. 9,. ~ .......... O. 9 .......... ':~4. ,~ .....
;~0a9-"~043~00
Y-'5 500. 0 0 0 501. 7 4. ~ ;~73. 3
~oa~zaOoijoP ................
Y-ii o. o ~.'~ ................................ s.~ 8';> .............~'~'"~' ........
.2!.76.6
14~ O
6604. i ...... 22Q,~.,_.Q ..............3_0..2.~...Z .........
A0~9-~051301
Y.,!.!.R~ .............. 50~_0 0...0 ...... 507..2 .............. ~.}_ .......... ~_~.,_~ .........3569.0
A029-2051700
Y-I. 2 I060.4 ~0. i 1066,6 '-;.5
a~T~4~ 7~60.~ ~,6~ I 4~oa. 4 ~'.'i ~.;0~'.-i ....
A0ag-a0~6OOO
Y-? 50~.0 O. 0 .~07,.~
.......
Y-~ 500 0 0. 0 507. 7 0 ? 364. 4
AOag-2057700
Y-9 '' a~7o o.o 460.6 i'."~ .......z~2. e
A0ag-a058700
¥-1o o. o o. o 5.
Y-iS O. 0 O, 0 3. '6 t. 0 'i._~8'
A0~9-209~000
Y-17 493. 4 O. 0 500, 0 3 0 ! '~_~..
............. ~ .... ~ .
A02~-~0~3200
Y-16 500,0 C.O 516
( ~- ._$I~D~'12' [DRANO13]Y20'=~OSAP
SUMMARY ~ ...............
.The, we. Il '~hich come~' ~los~ to ~h'e:p:r'OP~'~:~'d '~elI
.......................................... ..................... ...................................
~,.
Closest approach distance =, ,. 30,
RIC~ OFF ~o~ this ~un = 500.
z~D ' $~$r-~f
~-~ ~x~77,~'s '~_-'.'7 .
2qO
/8~ 8&L
P4~ID I:~PS To ,'dUD
- czC~ ro ,m~m
1 - Brandt Dual Tandem Shale Shaker
1 - Demco 6-12" Cone Shale Desander
1- Demco 416H w/16 cones & (1) Demco
48H w/16 cones (Desilter)
1 - Drilco Atmospheric Mud Degasser
f
~0 ost.
1 - 200 gpm Operating Capacity Centrifuge
15 - Brandt MA5 Mud Mix Agitators 1 - 150 bbl. Trip Tank
1 - Recording drilling fluid pit level
indicator with both visual and audio
warning devices at driller' s console
- TANI k: Z
7O
1 - Drilling fluid flow s_ensor
with readout at dril]~%~.',s
console
CHECK LIST FOR NEW WELL PERMITS
ITEM _APJ~ROVE DATE
(1) Fee ~/~'~ //~%1'~ 1. Is
(2 thru 8)
(8)
(3) Admin 9~~~.t 17-~:-~
(10 and 1
(14 thru 22)
(23 thru 28)
(6) OTHER
(29 thru 31)
.
Geology:
HWK ._~
WVA
Engigeering:
LCS ~ BEW/"
rev: 04/03/86
6.011
e
10.
I1.
12.
13
Company
Lease & Well No.
NO
2. Is
3. Is
4. Is
5. Is
6. Is well to be deviated and is wellbore plat included ................ ~
7. Is operator the only affected party ......................
8. Can permit be approved before ten-day wait ............... .
Does operator have a bond in force ...................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate .....................................
Does the well have a unique name and number
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
YES
the permit fee attached ~
eeeeeeeeeeeeeeeeeeeeeee.eeeeeeeeeeeeeee...
~ell to be located in a defined pool ............................. ~-~
well located proPer distance from property line ...... ~'·
well located proper distance from other wells ........
sufficient undedicated acreage available in this pool
Is conductor string provided ........................................
Will surface casing protect fresh water zones .......................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons ................ ~ .....
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
For
29.
30.
31.
Is a diverter system required .......................................
Is the drilling fluid programsschematic and list of equipment adequate
Are necessary diagrams and descriptions of ~--~-n~ BOPE attached.
Does BOPE have sufficient pressure rating - Test to ~O~ psig ..
Does the choke manifold comply w/AFI RP-53 (Feb.78) ..................
Is the presence of H2S gas probable .................................
32.
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
Additional requirements ..............................................
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE