Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout186-100 MICROFILMED 9/1 ~/00 DO NOT PLACE ANY NEW MATERIAL IS PAGE PLUGGI~G & LOC3.TION CLE~_~_~CE REPORT S t a~ a o f k! aska A~AS~ oz.-. Review ~e well file, a~d' c-~,~.--~: on plugmj~q, well head Well hea~ ~C ~f: .- ~;~ar 'pose or place: Locan£on Clearance: ALASKA OIL AND GAS CONSERVATION COMMISSION Plugged Back for Sidetrack WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [-1 Oil ~-~ Gas ]~ Suspended [~ Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 186-100 399-209 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21599 4. Location of well at surface ,, ............... ~ 9. Unit or Lease Name 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UM ~~ ~ ... At top of productive interval 9-~¢~,~ ~.' ~i 10. PrudhOewell NumberBay Unit 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UM ~-?~_./.'~/~. )~ G-19 At total depth~ 11. Field and Pool 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UM Prudhoe Bay Field/Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 67.06' AMSLI ADL 028285 12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband. 115. Water depth, if offshore 116. No. of Completions 6/6/86 6/20/86 10/26/99 N/A MSLI Zero 17. Total Depth (MD+TVD) J18. Plug Back Depth (MD+TVD)J19. Directional Survey ~20. Depth where SSSV set 121. Thickness of Permafrost 11600 9093 FTI 11400 8967 FTI [] Yes [] No! N/A MD I 1900' (Approx.) 22. Type Electric or Other Logs Run DIL, BHCS, CDL/CN Log-Poro, CDL/CN Log-Raw 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-I-rOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' 26" 8 cu yds Concrete 13-3/8" 72# L-80 Surface 2703' 17-1/2" 3808 cu ft Permafrost 9-5/8" 47# L-80 Surface 10595' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 10341' 11600' 8-1/2" 448 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 10291' 10183' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11250' Set Whipstock 11250' P&A w~h ?.0~bls ¢l.,.a,s. s~, ~qzd at 1500 psi 27. PRODUCTION TEST ' Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not on Production I N/A .. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL?'[~'~!I~HOKE ,~l~if)~'~',r~,~iAS-OIL RATIO TEST PERIOD / Flow Tubing Casing Pressure iCALCULATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. '.D 24-HOUR 28. RATE CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 10617' 8403' Shublik 'A' 10651' 8430' Sadlerochit / Zone 4 10749' 8505' 31. List of Attachments Summary of Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble "~~_, ~ Title TechnicalAssistantlll Date G-19 186-100 399-209 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: indicate which elevation is used as reference (where not othervvise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 WSA- Well Operations Telex To: Anchorage Production Engineering Date: From: Wendt Cost Code: G-19 Kill Well & Set Whipstock Well: Operation: Detail Code: Job ID: Est Daily Cost: October 22, 1999 4P1331-9335-040-420 CTS DTR K/Wh i pstoc Idetc N/A $56,977 Summary October22~ 1999: MIRU HB&R. Kill well with 314 bbls FSW and freeze protect with 35 bbls MEOH. RD HB&R, RU Schlumberger Ut #2150. Pick up Baker whipstock, 1 weight bar, GR/CCL and setting assembly. RIH. Tie in and set whipstock at 11250' (ref: BHCS 6/20/86). Orientation: 14.9° right of High Side (looking downhole). R/A tag @ 10.1' below top of whipstock. Tag and log off to confirm set. POH. RD Schlumberger. Tag master and left well shut in. Initial Well Status SIWHP lAP 0AP GLP FLP FLT (psi) (psi) (psi) (psi) (psi) (°F) Shut In 2300 600 300 N/A 0 38 Time Operation ~.iii!~ii?iii01221:i.:. ~i.: i ?~i?~?~.iii.?? i?...~!~ ~ ~ ......?. ~ ~ ~,,~.~,..,,?,~ ~ ~.~.~..~.. ~. ~ .'i::i~:~i.!~ii:.!iii.~.i.i ?:~!~:~iil ! ~ 1400 RU HB&R after RD of Slickline (dummy whipstock run) 1420 Safety Meeting. PT lines to 4000 psi 1430 Kill well with 5 bbls MEOH followed by 314 bbls FSW, followed by 35 bbls MEOH. 1600 RD HB&R, RU SWS UT # 2150. Safety Meeting 1730 Lay out and orient whipstock to POS tool. High Voltage when shooting through GR. Trouble shoot tool string. Switch GR tools. PU 1 eccentric weight bar and orient WS face 30° right of "0" on weight bar/tool string 1830 Power down equipment and arm SAFE system 1905 Pick up lubricator and whipstock assembly. PT with well pressure. 1916 RIH @ 100 fpm, slowing for GLM's etc. 2125 Log for tie in at 11400' to 11100'. Make 21' correction 2130 Log into position, check correlation. Top of W/S @ 11250' (ref: BHCS 6/20/86). Orientation: 14.9° Right of HS looking downhole. Set W/S 2142 Lo~l off 2147 Confirm set by tag and log off again. W/S in place - good indication of proper set. 2152 POH 2300 OOH. Lay down tools. RD SWS 0030 Off Location Page1 G-19 Whipstock October 22, 1999 Page 2 Final Well Status SIWHP lAP OAP GLP FLP FLT (psi) (psi) (psi) (psi) (psi) (°F) Shut in 0 600 300 N/A 0 35 Fluids Pumped BBLS. Description 314 Filtered Seawater 4O MEOH 354 Total Volume Pumped Well: G-19A Accept: 10/26/99 Field: Prudhoe Bay Spud: 10/29/99 APl: 50-029-21599-01 Release: 11/04/99 Permit: 199-103 CTD Unit: Nordic #1 10/26/99 1 Move Nordic Rig #1 from J Pad to G-19a. Accept rig on G-19A at 04:00 hrs, 10/26/99. Nipple up BOPE. 10/27/99 2 11253' Position green tank. M/U hardline. Tested BOPE. Fax'd Test report to AOGCC offices. Checked SITP: 1780 psi. Bullheaded 225 bbls SW to kill well. RIH with cementing BHA #1. Tag whipstock on depth. Pull up to 11130 ft. Circulate well. Batch 32 bbls, 15.8 PPG, "G" CMT. CMT at wt at 15:45 hrs. Safety Meeting. Press test cement line. Stage 32.2 bbls, 15.8 PPG, "G" CMT. Close Choke. Displace with Seawater. Squeezed 5 bbls CMT out and had 800 psi SQZ pressure. Laid in 14 bbls at 1.1 BPM. WCTOC at 10,750 ft. Pull to 10400 ft. Held 30 minute, 1500 psi Squeeze pressure test. Good Test. Bleed off WHP to zero. RIH circulating Biozan to nozzle. Cleanout cement to 20' above whipstock. POOH jetting cement to surface. LD cementing BHA. MU milling BHA. RIH with 3.80" dimple mill and motor. Mill XN nipple at 10267'. Drill firm cement from 11230-11253'. Attempt to mill window and made little progress. PQOH to check BHA. 10/28/99 3 11253' POOH. Check BHA for leaks. None found. Change out motor and mill. RIH with BHA #3. Tag whipstock on depth. Start milling window. Flag CT at 11253.4 ft. Stacking wt with only a total of 2 stalls. Steady motor work but no progress. Circulate high viscosity sweep to clean hole. 400 psi motor work with 3.5K WOB. Slow stall, pick up, set down with only 80 psi motor work. POOH. Found Baker Lockable Swivel had parted. Top of fish is 3.125" OD. Fish - 81.4 ft long, setting on bottom. Rig up slickline unit and RIH with overshot and 3.125" grapple. Unable to get by sliding sleeve. POOH. LD WL unit. W© WL crew to rest while turning down overshot OD at Baker machine shop. 10/29/99 4 11259' Halco WL RIH with 3.78" OD overshot with 3.125" grapple on 0.125" wire. Safety Meeting. Bait fish. Shear off and POOH. R/U braided line equipment. Held Safety Meeting with all personnel. RIH with BL fishing tools. Latch fish, jar up once, pull fish free and POOH with fish. Recover 100% of milling BHA. RID wireline unit. Held rig evacuation drill. All personnel accounted for. M/U milling BHA #4 (3.80" dimple mill). RIH. Tag whipstock and correct depth to 11253.5 ft. Mill window from 11253.5-11259'. POOH. RIH with BHA #5 (3.625" formation mi11/3.80" string reamer). Dress window to 11259' and had no more progress. POOH to check BHA. Found formation mill cored due to prior run not cutting completely thru casing. RIH with BHA #6 (3.80" bullnose formation mill/3.80" string reamer). j ka eared rvices riiling Date: Oct. 18,1999 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Petroleum Engineer Re: Well G-19 Prep for CT Sidetrack Well G-19 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare G-19 for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached. 1. A Casing Integrity Test was successful on 9/20/99. 2. A whipstock drift and a Kinley caliper have been run. '~ ,x~~ \\ v-,,c~ 3. E-Line will set a mechanical whipstock at approx. 11,245' MD. 4. Drilling coil will squeeze cement past the whipstock and test to 1500 psi with AOGCC witness. Step 3 is scheduled for Oct. 27, 1999. Cementing, window milling and drilling are scheduled to commence on Nov. 1, 1999. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center STATE OF ALASKA ALASKA ..,IL AND GAS CONSERVATION C,...,,,1MISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface /' ,/ ,./ 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UM At top of productive interval 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UM At effective depth 536' SNL, 1692' EWL, SEC. 14, T11N, R13E, UM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UM 5. Type of well: [~] Development [] Exploratory [] Stratigraphic []Service . Datum Elevation (DF or KB) KBE = 67.06' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number G-19 9. Permit N,~ber 86-100 10. APl Number ,¢/ 50- 029-21599 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Casing 12. Present well condition summary Total depth: measured 11600 feet Plugs (measured) true vertical 9093 feet Effective depth: measured 11400 feet Junk(measured)Fill at 11400' MD (06/89) true vertical 8967 feet ~ ~.~ liPidE Length Size Cemented M D TVD Structural Conductor 110' 20" 8 cu yds concrete 137' 137' Surface 2676' 13-3/8" 3808 cu ft Permafrost 2703' 2641' Intermediate 10568' 9-5/8" 575 cuft Class 'G' 10595' 8387' Production Liner 1259' 7" 448 cuft Class 'G' 10341' - 11600' 8188' - 9094' Perforation depth: measured Open: 11386'- 11406', 11416'- 11448', 11458'- 11476' Sqzd: 11180' - 11185', 11328' - 11348', 11362' - 11386' true vertical 8819' - 9017' (six intervals) ,'3,'~ '~- u / 1999 0iI~,, '" Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10183' with 4-1/2" tailpipe to ,~, Coos. Packers and SSSV (type and measured depth) 9-5/8" TIW packer at 10183'; 4-1/2" SSSV Nipple at 2070'~l)Chorc?ge COIT?~/S$ioR' 13. Attachments 14. Estimated date for commencing operation October 27, 1999 Description summary of proposal I 15. Status of well classifications as: [~ Oil E~} Gas [] Suspended Service Date approved Prepared By Name/Number: 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 Detailed operations program ~ BOP sketch Terrie Hubble, 564-4628 17.I hereby certify that the fo_reg.oing is true and correct to the best of my knowledge Signed ¢'~~~ Ted Stag Title CT Drilling Engineer Date / ~¢/~/ Commission Use Only Condition,s.p,f~pproval: Notify Commissio~so representative ma.,v, witness I Approve, NO. .... roved' uu¥-, Plug integrity ~' BOP Test yr Location clearance I  "" ~ _-- Mechamcal Integrity Test__ Subsequent form required 10- 9,¢.~r . . -~r of the Commission %~ ~GeI~N AN L cS~ nC.' sNt ~Ds oB~ Commissioner Date/0 '~m Form 10-403 Rev. 06/15/88 .q,~thmit In Trinlic. 2t~ TREE: CAMERON 4" WELLHEAD: McEVOY G-19a Proposed Completion KB. ELEV = 67.06 BF. ELEV = 40.41 A~'TI IAT/'~Do AVI=I C~/~KI 9-5/8" FOC 2,661 13 3/8" 72# L-80 BTRS I 2'7°51 KOP: 1800 MAX ANGLE: 51 ° 4-1/2" 12.6# L-80 BTRS TUBING ID: 3.958" CAPACITY: 0.01522 BBL/FT NSCC Thread from surfacce I 4,750 4-1/2 SSSV LANDING NIPPLE (OTIS) (3.813" ID) I 2,070 ] GAS LIFT MANDRELS ( OTIS W/RA LATCH) N° MD(BKB) TVDss Dev 5 3,094 3,008 4 4,546 4,201 3 6,947 5,895 2 9,385 7,587 1 9,572 7,718 4-1/2" SLIDING SLEEVE (OTIS XA) (3.813" ID) SEAL ASSY. (SBR) 10,107 Top of 2 7/8" liner approx 10,240' ~ 9-5/8" PACKER 110,183 I ~ (TIW) ("ID) 4-1/2", 12.6#/ft, L-80 TAILPIPE 4-1/2 X"NIPPLE I .... (OTIS) (3.813" ID) 10,225 Top of 7" Liner 110,340~ 9-5/8", 47#/ft, L-80, BTRS I1 0,595 2 7/8" Liner cemented to approx. 200 ft above window 4-1/2 .... XN"NIPPLE 110,258 (OTIS) (3.725" ID) 4-1/2" TBG TAIL / 0,291 (ELMD)ll 0,302 Whipstock approx. 11245' PERFORATION SUMMARY REF. LOG: BHCS 6-20-86 Size SPF Interval iOpen/Sqzed 3-3/8" 12 11,180-11,185 Sqzd4/20/96 3-3/8" -7 11,328 - 11,348 iSqzd 4/20/96 3-1/8" 4 11,362 - 11,386 ~Sqzd 4/20/96 3-3/8" 4 11,386 - 11,406 :Open 5/7/90 3-3/8" 4 11,416 - 11,448 Open 5/7/90 3-3/8" 4 11,458 - 11,476 Open 5/7/90 7" 26# L-80 IJ4S I11,600 1 Cement downsqueezed past whipstock STATE OF ALASKA ALAS '"')ILAND GAS CONSERVATION COMMISSIr REPORT C,¢' SUNDRY WELL OPE,- ATIONS 1. Operations performed: Operation shutdown Stimulate. Plugging__ Pull tubing Alter casing __ Repair well_ Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UPM At effective depth 536' SNL, 1692' EWL, SEC. 14, T11N, R13E, UPM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service ORI61NAL 6. Datum elevation (DF or KB) KBE = 67.06 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit number/approval number 86-100 / 10. APl number 50- 029-21599 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 11600 feet Plugs (measured) true vertical BKB 9093 feet measured 11400 feet Junk (measured) true vertical BKB 8967 feet Length Size Cemented 110 20 8 c.y. 2676 13 3/8 3808 c. f 10568 9 5/8 575 c. f fill at 11400' MD (06/89) Measured depth True vertical depth BKB 137 137 2703 2640 10595 8386 1259 7 448 c. f 10341-11600 8187-9093 measured {11328'-11348', 11362'-11386'}sqzed 11386'-11406', 11416'-11448',11458'-476' true vertical subsea 8853'-8949' (eight intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 10183'; 4 1/2" SSSV at2OZO:..~ ~ ¢. ~ ~ ' ~"~ 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1089 16566 89 0 1789 Subsequent to operation 1141 16026 15 0 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run . I Daily Report of Well OperCqns _ ~ I Oil_X_. Gas Suspended 17. I here.by-/cert,~ that, the f, eCeg°ing is true_ ar)d'~orrect to the best of my knowledge. Signed /;:F~//./~-~;.?~/¢~,/~~....~,..¢.¢,.~,¢.~ Title Technical Assistant III Form 1 ~-404/~Rev 0/6/15/88 1999 Service WELL G-19(21-14-11-13) Addperf 10/2/95 The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11180'- ll185'MD LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPZNE DRZVE ANCHORAGE AK, 99501 . Date: 6 October 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION ~,' \~% K-07 (23-33-12-14) ~.~L\\~ K-11 (32-33-12-14) ~\ K-01 1 CN/GR FINAL BL+RF · 1 PDK FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 CN/GR FINAL BL+RF 1 CN/GR FINAL BL+RF ECC No. Run ~ 1 3770.03 Run ~ 1 3789.01 · Run ~ 1 5832.04 Run ~ 1 5967.04 Run # 1 6189.01 Run # 1 6492.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by: /,./,~/~te: RECEIV[D OCT ! /Mask2 0il & Gas Cons. C~mm~i0n Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 13 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: DESCRIPTION GR/CCL FINAL BL+RF CN/GR FINAL BL+RF CN/GR FINAL BL+RF CN/GR FINAL BL+RF 1 CN/GR FINAL BL+RF ECC No. Run # 1 5157.09 Run ~ 1 5607.11 Run # 1 5661.10 Run # 1 5953.09 Run # 1 5967.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 _ O~~ ~'~-5'.~ Received b~ /~ ~ Date: ""e'$O~?:' C;',~ ~et~teeP~ic~ Data Cente~ 8F Exploration (Alaska) Ins ~0 ~st Benson Boulevard ~choraEe, ~km 99508 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 21 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed,-please~find-the data-as described below. NElL ' # Dt~SCR'rPTION G-15 1 LDWG T~E+LIS D-18 1 LDWG TAPE+LIS ~ . G-19 ~ ~t 0~ ~ i LDWG T~E+LIS ECC No. Run # i 1151.06 Run # I 5661.10 Run # 1 .. 5967.03 Please sign~and return to: Attn'" Rodney D. Paulson ~'~- .'- _--. ~ '~- .~.i~ - Atlas Wireline Services - . _~-~ .... ~_~ ~- ......... ~ ..... -- ~-. - 5600 B Street ~:~"'~.~'~.~:~ :..:~ ~----~ - ' ' Suite 201 · ~.-'<-~~1%.~%~-~%~ ~--~.'~ ~;~.~-~~-~ ~ h- Or F~ to (907)563-7803' - ~'~~~::-~'~~- .......... ~ { J ~/' .... / ~(/ ~' .... / ' · ~~i o~ission SEP 2 8 1995 Alaska 0il & Bas C~s. CommJssJo. ~cho~ge STATE OF ALASKA ,~- 3:~A OIL AND GAS CONSERVATION COMMIt REPOR'Ii OF SUNDRY WELL OP,-:HATIONS 1. Operations performed: Operation shutdown Stimulate Plugging__ Pull tubing__ Alter casing Repair well Perforate X Other × 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410'SNL, 2133'EWL, SEC. 14, T11N, R13E, UPM At effective depth 536'SNL, 1692'EWL, SEC. 14, T11N, R13E, UPM At total depth 587'SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Stratigraphic ,., Service RECEIVED MAY-9 1995 Qii & Gas Cons. C0mmissi.o.n 6. Datum elevation (DF or KB) KBE = 67.06 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit numbe#approvalnumber 86-100 / 10. APInumber 50- 029-21599 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: true ve~ical measured true ve~ical Length 11600 feet Plugs (measured) BKB 9093 feet 11400 feet Junk (measured) BKB 8967 feet Size Cemented 110 20 8 c.y. 2676 13 3/8 3808 c.f. 10568 9 5/8 575 c.f. fill at 11400' MD ¢6/89) Measured depth True ve~icaldepth BKB 137 137 2703 2640 10595 8386 1259 7 448 c.~ 10341-11600 818~9093 measured {11328'-11348~ 11362L11386~sqzed 11386'-11406~ 11416'-11448~11458'-476' true ve~ical subsea 8853L8949'~ight~terva/s) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 10183'; 4 1/2" SSSV at 2070; 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 2217 27234 62 0 2387 19777 156 0 Tubing Pressure 1104 310 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c~rtify that the forego~, is t~u~ a/nd correct to the best of my knowledge. Signed ~;~ .~ ( .":;' /~'/.J/'V'~ Title Senior Technical Assistant II Form 10-4041R~v 06/1'-5~88 /7 D at e ~4,~/,p/ SUBMIT IN DOPL/fCATE WELL G-19(21-14-11-13) Reperf/NRWO Operations 8/4/94 The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11332'- 11344' MD 8/5/94 A GSO Gel Squeeze was performed using the following fluids: SUMMARY TIE INTO XN. TAG TD AT 11476'. LAY IN 2,856 # 20/40 CARBOLITE. TAG CARBO TOP AT 11358'. INCREASE IAP TO 1000 PSI. INJECT FSW DOWN BS AT 6 BPM AND 2500 PSI. INJECT DOWN COIL AT 1 BPM AND 800 PSI. ORDER OUT 120 BBL MARASEAL WHILE CONTINUING TO PUMP. PRESSURE UP IA TO 1000 PSI. START MARASEAL DOWN COIL, AND INCREASE IAP TO 1500 AFTER SEEING MARASEAL PRESSURE RESPONSE. WH PRESSURE INCREASED QUICKLY AFTER THE MARASEAL HIT THE FORMATION. INITIAL PRESSURE STABILIZATION AT APPROX 1960 PSI WHP OCCURED AT 20:00 HRS WITH 21 BBL MARASEAL OUT THE NOZZIJE. A SECOND WHP INCREASE WAS NOTED FROM APPROX 20:33 TO 21:60 HRS. FIELD INSPECTION OF PETRADAT DATA INDICATES BHP'S OF 5200 AND 6000 PSI RESPECTIVELY. GAS IS SUSPECTED ON THE BACKSIDE OF THE COIL BECAUSE OF A SUBSTANTIAL PRESSURE DIFFERENTIAL OBSERVED AFTER SHUT DOWN. BHT WAS A BOUT 150 F. WHILE MARASEAL WAS COMING OUT THE NO721.E. PETRADAT REPORT TO BE SENT TO APE. FURTHER ANLYSIS DEFERPd~D TO SAME. NOTE: WHITE "MERINGUE" GEL AND CARBOLITE ON BHA AT SURFACE. 152 46 70 158 256 118 34 34 FLUIDS BBLS SW TO LOAD WELL BBLS BJ HEC GEL BBLS FSW SLURRY DISPLACEMENT BBLS FSW DOWN BS TO FLUID PAK WELLBORE AND CHECK INJECTIVITY BBLS FSW DOWN COIL TO COOL DOWN WELLBORE WHIlJE WAITING ON GEL BBLS MARASEAL B BLS FSW DISPLACEMENT BBLS FSW COIL DISPLACMENT WHILE POOH. '"9 1995 Oil & Gas Cons. Commission , '_gnchor~, ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 1 September 1994 RE: , Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. 11-02-11-12) 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 CCL/TUBCUTR FINAL BL 1 CCL/TUBCUTR RF SEPIA 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA Run # 1 2352.03 Run # 1 Run # 1 4629.02 Run # 1 Run # 1 5967.02 Run # 1 % t//~/~-17 (14-23-11-13) ~/~Q-03 (11-15-11-13) ~~34ST (34-1-10-14) //E-27 1 CCL/TUBCUTR FINAL BL 1 CCL/TUBCUTR RF SEPIA Run # 1 6036.03 Run # 1 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA Run # 1 6081.01 Run # 1 1 SSVD FINAL BL 1 SSVD FINAL RF SEPIA Run # 1 6122.00 Run # 1 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Run # 1 6233.02 Run # 1 Received Please sign and return to~tl~s Wir~$ne Se~ice~ ~ t D ~ ~' ~ ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 10 August 1994 RE: ~ Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL D-l, {14-23-11-13>. DESCRIPTION 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 COLLAR LOG FINAL BL 1 COLLAR LOG RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 6016.05 4535.01 6036.02 5967.01 5761.03 Please sign and return to: Atlas Wireline Services 5600 B Street REC. E~VED Suite 201 Anchorage, AK 99518 AUG ] ~ %9~4 y~/~/~. Rodney D. Paulson ~ ~Cg~S.~j0flltnis$i0~ Received b --'~ //;~J~.,~ Date: Please sign and return to: Petrotechnical Data Center BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alask~ 99,508 Received by II I I III II I I I I I I I I Date BP EXPLORATION BP Exploration (Alaska) Inc. gO0 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 06/09/93 T# 84652 BPX/PBU~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. D-ii ~ GAS LIFT SURVEY G_1 9~01~) PROD-F H_05~[.~_ PROD-F H_25~.~ PROD~F PDK-100 M-19~-%TM LEAK DET 05/19/93 #1 05/13/93 #1 06/02/93 #1 05/31/93 #1 06/02/93 #1 05/31/93 #1. 2870.00- 9650.00 ATLAS 2/5" 10800.00-11184.00 ATLAS 5 " 11200.00-11490.00 ATLAS 5 " 11200.00-11537.00 ATLAS 5 " 9940.00-10726.00 ATLAS 5 " 0.00- 8810.00 ATLAS 2 " Information Control Well Records RECEIVED JUL 0 6 1993 AJaska Oil & Gas Cons. Comm~ior~ Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISb, _hi REPORT OF SUNDRY WELL OPERATIONS.--:, 1. Operations performed: Operation shutdown Stimulate Plugging__ Perforate X '/~ ~'~ Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UPM At effective depth 536' SNL, 1692'EWL, SEC. 14, T11N, R13E, UPM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Stratigraphic Service Other X 6. Datum elevation (D;P~orq~) KBE-- 67.~A~,L foot 7. Unit or Property name Prudhoe Bay Unit '~' 8. Well number G-19 (21-14-11-13) PBU 9. Permit number/approval number 86-100/90-210 10. APl number 50- 029-21599 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11600feet BKB 9093feet 11400feet BKB 8967feet Plugs (measured) Junk (measured) fill at 11400'MD (06/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 20 8 c.y. 137 13 3/8 3808 c.f. 2703 9 5/8 575 c.f. 10595 110 2676 10568 1259 7 448 c.~ measured 11328Ll1348~ 11362Ll1406~ 11416511448' 10341-11600 True vertical depth BKB 137 2640 8386 818~9093 true vertical subsea 8853'-8931' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 10183'; 4 1/2" SSSV at 2070; 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 1170 6655 24 0 1690 997 28 0 Tubing Pressure 1579 222 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby (;ertify that the foregoing is true and correct to the best of my knowledge. Signed ~--_~-'~.; /k.~¢/~,¢, k ,/ ~ ~%rv~O Title SeniorTecflnicalAssistantl Form 10-404 Rev 06/15/88 Date .~/~'/¢.? SUBMIT IN DU~SLI/CATE WELL G-19(21-14-11-13) Non-RieWorkOver Approval#90-210 4/17/90 A NRWO (GSO) was performed using the following fluids: 365 bbls PW to Load Well 24 bbls 12%HCL/10% Xylene 75 bbls PW W/.2% Surfactant 5 bbls Eft H20(Spacer) 10 bbls Cement 15 bbls Eff H20 18 bbls Dual Polymer Class G Cement: FL28 .88%, CD31 .1%, Rl l .02%, FP6L 1 GAL/SK 5/07/90 The following interval were re-perfed using 3 3/8" guns, 60© orientation and 120© phasing. fjh 2/2/93 11386'- 11406' MD BKB 2 SPF 11416'- 11448' MD BKB 4 SPF 11458'- 11476' MD BKB 4 SPF "Add Perf" BP EXPLORATION R E Alas~ Oil & Gas Cons. Co~nrnission Anchorage BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/16/90 T#:81152 FROM: SUBJECT: Information Control Well Records LR2-1 BP 0ASED HOLE FINALS' Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-10 Completion 05/06/90 #1 10730-11092 Sch 5" Go19 Completion- 05/06/90 #1 10096-11460 Sch 5" J-24 TDT-P 05/06/90 #1 11 000-11568 Sch 5" N-14 Perf 05/07/90 #1 9350-10099 Sch- 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS ~ATE OF ALASka-' ,.ARCHIVES · BP EXPLORATION BP Exploration (Alaska)Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 0 3/0 7/90 T# : 80936 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. E-19 PROD-F 02/18/90 #1 11450-11710 Camco G- 19 PROD-F 0 2/17/9 0 # 1 11200-11490 Camco T-0 7I INJ 0 2/15/90 # 1 9 200-9650 Camco 11 5" 5" Dis tribution: ARCO ~N EXXON GEOSCIE~NCES MOBIL PHILLIPS RESERVOIR /~TA~T~ oF ALASK~_ ARCHIVES MAR ! 4 1990 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 5, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well G-19 (21-14-11-13) Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustainment work on the well. y truly, R. B. Frazier Supervisor Gravity Drainage RBF:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RECEIVED APR 1 0 ]990 0il & Ga,,; Cons. Co. mm~Ss~o.E~.. Anch0rag~ STATE OF ALASKA ~ _,$KA OIL AND GAS CONSERVATION COM~. .ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend__ Alter casing __ Repair well Change approved program __ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UPM At effective depth 536' SNL, 1692' EWL, SEC. 14, T11N, R13E, UPM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB Operation Shutdown .__ Re-enter suspended well Plugging __ Time extension __ Stimulate __ Pulltubing__ Variance__ Perforate__ Other X 5. Type of Well: 6. Datum elevation (DF or KB) Development X KBE = 67.06 AMSL feet Exploratory Stratigraphic Service 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit number 86-100 10. APl number 50- 029-21599 11. Field/Pool Prudhoe Oil Pool 11600 feet Plugs (measured) 9093 feet 11400 feet 8967 feet Junk (measured) fill at 11400'MD (06/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB 20 8 c.y. 137 137 13 3/8 3808 c.f. 2703 2640 9 5/8 575 c.f. 10595 8386 110 2676 10568 1259 7 448 c.f. measured 11328'-11348', 11362'-11406', 11416'-11448' 10341-11600 8187-9093 true vertical subsea RECEIVED 8853'-8931' (three intervals) Tubing (size. grade, and measured depth) 4 1/2"L-80 to 10183'with 4 1/2"tailp~oe to 10291' AP~, ~ Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 10183'; 4 1/2" SSSV at 2070~'~ '-i!;~. 0il & Gas Coils. Anchorag~ 13. Attachments Description summary of proposal × Detailed operations program BOP sketch × 4. Estimated date for commencing operation April 1990 6. ff proposal was verbally approved Oil X Gas Name of approver Date approved Service 7. I hereb/y./~ertify,that ~ f oing i~s true and correct to the best of my knowledge.  Title SupervisorGravity Drainage ~/ l ~ ~ /,f '.~ Si~lned / ,,vv,__,,~ ~. FOR COMMISSION USE ONLY 15. Status of well classification as: Suspended~ Date Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Mechanical Integrity Test~ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required I O- ORiGli',~^L SIGNI~D BY I.ONIX]IF C. SMITH L_,~A~,~D roval No. ~~°'~ec~ d ~P~ -~2/~ ~")ate '~--~'-~ ,~ ~ SUBMIT IN TRIPLICATE WELL G.19 (21-14-11-13) PBU CTU CEMENT SOUEEZE PROPOSAL A coiled tubing cement squeeze of existing perforations is proposed as follows: 1. Perform pre-workover surveillance. 2. Rig up CTU and support equipment and pressure test BOP's to 4000 psi. 3. Perform perforation acid wash and sump cleanout. 4. Pump cement and squeeze existing perforations. 5. Reverse out cement after squeeze is obtained. Wait overnight, then test squeeze by performing inflow test. If squeeze fails, immediately resqueeze. 6. If squeeze is successful, perforate the following intervals: 11386' - 11406' MD BKB 11416' - 11448' MD BKB 11458' - 11476' MD BKB All depths are referenced to BHCS 6/20/86. Return well to production and test. 1 mtp 04/05/90 RECEJ¥ED Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line)  =~ Slips ~--~ Pipe Rams Pump-In Sub (C irc u la t e/R e turn s ) W ell Head Swab Valve BP EXPLORATION July 6, 1989 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 ~1~ Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Hr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, Supervisor Gravity Drainage JTB:JAM Enclosures (4) cc: L. Burke (~B12-1) Well Records (LR2-1) w/10 Well File STATE OF ALASKA , .$KA OIL AND GAS CONSERVATION COMM~. ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed' Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410'SNL, 2133'EWL, SEC. 14, T11N, R13E, UPM At effective depth 536' SNL, 1692' EWL, SEC. 14, T11N, R13E, UPM At total depth 587'SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 67.06 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit number/approval number 86- I00 / 9-326 10. APl number 50- 029-21599 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 11600feet BKB 9093feet Plugs (measured) 11400 feet BKB 8967feet Junk (measured) fill at 11400' MD (06/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 20 8 c.y. 137 13 3/8 3808 c.f. 2703 9 5/8 575 c.f. 10595 110 2676 10568 1259 7 448 ~ measured 11328~11348~ 11362'-11406; 11416~11448' 10341-11600 True vertical depth BKB 137 264O 8386 8187-9093 true vertical subsea 8953'-8931' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 10183~ 4 1/2" SSSV at 2070; 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. F{e.oresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 1870 3809 60 0 1550 2887 55 0 16. Status of wellclassification as: Oil X Gas Suspended 301 342 17. I her~~~..~ ~,~ ~regoing is true and correct to the best of my knowledge. Signed ~' ~' <c~/~-"- -"-- Title Supervisor Gravity Drainage Form 10-4E4 Rev 06/15/88 Service SUBMIT IN DUPLICATE WELL G-19 (21-14-11-13~ PBU ADD'L. PERFORATION OPERATIONS The following additional interval was perforated June 17, 1989 using Schlumberger 3 3/8" Hyperjet II carrier guns at 1 spf: 11328' - 11348' MD BKB (Ref. BHCS, 6/20/86) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations, then tested. jam 6/27/89 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL" PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES Date: 06-26-89 T~: 80142 BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: F-07 COMP (PERF-GR-CCL) 06-18-89 #1 9130-11916 Sch 5" G-19 COMP 06-17-89 #1 10031-11345 Sch 5" H-26 COMP 06-17-89 #1 9388-9976 Sch 5" Received: Date: Alaska Oil & Gas Cons. Commissioz3 Anchorage Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION April 27, 1989 BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, . . Brown Supervisor Gravity Drainage JTB:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISblON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend ~ Alter casing __ Repair well~ Change approved program __ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UPM At effective depth 566' SNL, 1605' EWL, SEC. 14, T11N, R13E, UPM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11600 feet true vertical BKB 9093 feet Operation Shutdown ~ Re-enter suspended well .__ Plugging ~ Time extension Stimulate__ Pulltubing__ Variance~ Perforate x Other__ 5. Type of Well: 6. Datum elevation (DF or KB) KBE = 67.06 AMSL feet Development Exploratory Stratigraphic Service 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit number 86-100 Effective depth: measured 11520 feet true vertical BKB 9043 feet Plugs (measured) 10. APl number 50- 029-21599 11. Field/Pool Prudhoe Oil Pool Junk (measured) fill at 11520'MD (05/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB 20 8 c.y. 137 137 13 3/8 3808 c.f. 2703 2640 9 5/8 575 c.f. 10595 8386 110 2676 10568 1259 7 448 c.f. measured 11362'-11406', 11416'-11448' 10341-11600 true vertical subsea 8876~8931'~wo ~rvals) Tubing (size, grade, and measured depth) 4 1/2"L-80 to 10183'with 4 1/2"tailpip to 10291' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 10183'; 4 1/2" SSSV at 2070; 818~9093 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation May 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sisned ~ .~~ Title SuporvisorGravity Drainage FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL $1GNEO BY LOI~iNIE C. SMITH Date I^pprowl No. /~_ c~~' e -ove cop'J ~- Dat e,...~--__ ~, _~,~ SUBMIT IN TRIPLICATE WELL G-19 (21-14-11-13~ PBU ADD~L. PERFORATION PROPOSAL We propose to perforate the following additional interval during May 1989: 11328' - 11348' MD BKB (Ref. BHCS, 6/20/86) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 4125189 BOWEN PACKOFF FLOW TUBES & PACKOFF HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE FLOWLINE VALVE GREASE LINE RISER BOP GREASE -"MANIFOLD GREASE PUMP .-GREASE RESERVOIR Stc~ndard Alc~ska Production Compu~¥ 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION January 31, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 G-19 Well File /A. Bragg nager Production Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA AlaSKA OIL AND GAS CONSERVATION COMMISoiON REPORT OF SUNDRY WELL OPERATIONS 1, Operations performed: Operation shutdown Pull tubing 2, Name of Operator Standard Alaska Production Company 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 410'SNL, 2133'EWL, SEC. 14, T11N, R13E, UPM At effective depth 566'SNL, 1605'EWL, SEC. 14, T11N, R13E, UPM At total depth 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Stimulate X Plugging Perforate Alter casing Repair well Other 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE-- 67.06 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number G-19 (21-14-11-13) PBU 9. Permit number/approval number 86-100 / 8-830 10. APl number 50- 029-21599 11. Field/Pool Prudhoe Oil Pool 11600 feet BKB 9093feet 11520 feet BKB 9043feet Plugs (measured) Junk (measured) fill at 11520' MD (05/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 20 8 c.y. 137 13 3/8 3808 c.f. 2703 9 5/8 575 c.f. 10595 110 2676 10568 1259 7 448 measured 11362'-11406~ 11416'-11448' 10341-11600 True vertical de~h BKB 137 264O 8386 818~9093 true vertical subsea 8876'-8931' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpip to 10291' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 10183'; 4 1/2" SSSV at 2070; 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Re.Dresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 940 733 36 0 1480 1118 105 0 Tubing Pressure 233 24O 15, Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16, Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge, Signed /~~ //~A/~ Title Manager Production Engineering Form 10z4'~4 Rev-06/15/88 ~/'~/ SUBMIT IN DUPLICATE WELL O-19 (21-14-11-13~ PBU STIMULATION OPERATIONS A breakdown job using 15% HC1 and ballsealers followed by a mud acid wash was performed on the following perforated intervals in Well G-19. 11362' - 11406' MD BKB 11416' - 11448' MD BKB Prior to the breakdown'job a bullheaded 1000-gal. HC1/xylene tubing wash was performed 11/12/88. The breakdown was performed 11/14/88 as follows at a rate of 8- 10 bpm and a maximum injection pressure of 4000 psi. 38 bbls. 2% NH4C1 107 bbls. 15% HC1/20% xylene (drop 450 5/8"OD 1.1 SG ballsealers evenly thoughout the 110 bbls. 195 bbls. diesel The well was surged three times to knock the balls off the perforations. The clay acid treatment was bullheaded as follows: 50 bbls. diesel 64 bbls. 15% HC1 w/diverter 175 bbls. 12% HC1 - 6% I-IF w/diverter 170 bbls. NH4C1 brine w/mutual solvent overflush 25 bbls. diesel to dissolve OSR flush to perfs w/dead crude containing 300-500 scf/bbl nitrogen A nitrogen lift was performed 11/15/88; then the well was returned to production and tested. jm 1/23/89 Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION November 2, 1988 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. JAB:JA~4~ Enclosures (g) cc: L. Burke (MB12-1) G-19 Well File Yours very truly, ~MJ;naA~eBrr~rgogduction Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown Re-enter suspended well__ Alter casing __ Repair well__ Plugging ~ Time extension __ Stimulate x Change approved prograrn Pull tubing __ Variance .__ Perforate __ Other __ 5. Type of Well: 2. Name of Operator Standard Alaska Production Company Development x Exploratory ~ 3. Address Stratigraphic__ 7. P. O. Box 196612, Anchorage, Alaska 99519-6612 service~ 4. Location of well at surface 8. 1535' NSL, 2276' EWL, SEC. 12, T11N, R13E, UPM At top of productive interval 9. 410' SNL, 2133' EWL, SEC. 14, T11N, R13E, UPM At effective depth 10. 566' SNL, 1605' EWL, SEC. 14, T11N, R13E, UPM At total depth 11. 587' SNL, 1547' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: Plugs (measured) 6. Datum elevation (DF or KB) KBE= 67.06 AMSL feet Unit or Property name Prudhoe Bay Unit Well number measured true vertical G-19 (21-14-11-13) PBU Permit number 86-100 APl number 50- 029-21599 Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 11600 feet BKB 9093 feet 11520 feet BKB 9043 feet Junk (measured) fill at 11520' MD (05/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB 20 8 c.y. 137 137 13 3/8 3808 c.f. 2703 2640 9 5/8 575 c.f. 10595 8386 110 2676 10568 1259 7 448 c.f. measured 11362'-11406', 11416'-11448' 10341-11600 true vertical subsea 8876~8931'~wo ~tervais) Tubing (size, grade, and measured depth) 4 1/2"L-80 to 10183' with 4 1/2" tailpip to 10291' 8187-9093 Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 10183'; 4 1/2" SSSV at 2070; 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch X 14. Estimated date for commencing operation November 1988 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby. ~t_the f/~rego, ing is_true and correct to the best of my knowledge. Signe~L)~ Z,r'L Title Manager Production Engineering · ~FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test__~ ~.-,.L°cati°n clearance Mechanical Integ rity Te~Sub~u~~~.¢ h~ Approved by order of the Commissib,~ 15. Status of well classification as: Suspended D at e/?/~//X,~/ I Approval No. Approved Copy Returned //~ , I Commissioner Ba:e ~/, ~./~¢ _ I WELL G-19 (21-14-11-13) PBU STIMULATION PROPOSAL A breakdown job using 15% HC1 and ballsealers followed by a mud acid wash is proposed for the following perforated intervals in Well G-19. 11362'- ll406'MDBKB 11416'- l1448'MDBKB Prior to the breakdown job a bullheaded 1000-gal. HC1/xylene tubing wash will be performed. The breakdown will be performed as follows at a rate of 8-10 bpm and a maximum injection pressure of 4000 psi. 40 bbls. 2% NH4C1 110 bbls. 15% HC1/20% xylene (drop 450 5/8"OD 1.1 SG ballsealers evenly thoughout the 110 bbls. The well will be surged three times to knock the balls off the perforations. The clay acid treatment will be bullheaded as follows: 50 bbls. diesel 70 bbls. 15% HCl w/diverter 180 bbls. 12% HC1 - 6% HF w/diverter 170 bbls. NH4C1 brine w/mutual solvent overflush 25 bbls. diesel to dissolve OSR flush to perfs w/dead crude containing 300-500 scf/bbl nitrogen The well will be returned to production and tested. jm 10/26/88 Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Of~ Blind Rams Cutter Rams 2' Chicksan (Kill Line) Slips ~:: ~ Pipe Rams ump-ln Sub (Clrcula te/R e turns) Well Head  Swab Valve .~--~._- .Sta ndo,,d AIosLo 900 IFo,.~ I~.,-,.,on P.O 8.o,, 19661? An(ho~, o0e' AIo,.L o 19071 .564-5 I I I A~RCO EXXON PHILLIPS STUN D.a, RD ALASKA PRODUCTION 05116/88 Date- 78839 SYSTEMS (Transmittal & Tape) ARCHIVES REF~E: SAPC MAGNETIC LIS TAPES & LISTINGS 5he following material is bein9 submitted herewith. Please acknowledge receipt by signing a cc?f of this letter and returning it to this office: C-35 G-19 J~l 8746 5-9602 Sch #72743 Tape Pos CH/CiviL 05/05/88 ,~; . . 1 600bpi CH/CNL 05/03/88 #1 10550-11517 Sch #72731 Tape Pos. 1600bpi #05750 #05751 * E>LXON' An Asterisk (*) next to a listing above means you should have received the Tape( and L: Iting(s) directly he respective service compan on Received Date Victoria Aldridge D¥1~',tATI Ot~ LI3~Vl]~OL :,Veil Records LR2-1 DALI.AS ARCO CHEVRON E~CfON TEXACO INDEXED STANDARD ALASKA PRODUCTION .:E Date: 05/12/88 TO: MOBIL Ti: 78832 PHILLIPS j GEOSCIENCES SAPC CASED HOLE FINAL LOGS ARCHIVES REFERENCE: The following material Is being submll-fed herewith. Please acknowledge receipt by signing a copy of thls letter and returning it to this office: A-17 B-5 B-9 B-12 B-29 C-35 C-38 F-10 G-16 G~19 M-7 N-11A R-16 R-27 W-35 W-35 W-35 X-17 Collar " 04/22/88 HP Statics 05/04/88 Packer Setting'Service 05/03/88 Collar CNn~eR CNn / 6~ CNn/OR Collar Production CNn/OR PFC CNn/OR Production CNn/OR Perf. Record CET CBT 04/28/88 o5/o8/88 o5/o5/88 o5/o5/88 04/26/88 o5/o6/88 o5/o3/88 04/27/88 05/04/88 05/07/88 05/04/88 o5/o5/88 o5/o5/88 o5/o5/88 05/08/88 #1 9350-10206 ,Atlas 5" #1 11452-11864 Sch 5" #1 8900-9928 Sch 5TM #1 9000-9423 Atlas 5" #1 8800-9438 Sch 51' #1 8750-9585 Sch 5" #1 10300-1-1t36 Sch 5" #1 9600-9989 Atlas 5" #1 9850-10093 Sch 5" #1 10550-11517 Sch 5" #1 8200-9932 Atlas 5" 1 9850-10608 Sch 5" #1 11200-11600 Sch 5" #1 9000-9791 Sch 5" #1 9500-10530 Sch 5" #1 9442-10582 Sch 5" #1 9442-10561 Sch 5" #1 9480-10167 Sch 5" Rece i ved Do ;,'~1 Ssondo,d 0.1Co-',rx:-',~, Fo,.,..ded ,,., Cle.¢lond. C~,o. ,. & Victoria ge ~NFOPOMAY ~ON CONYROL We~ ~ Records LR2-~ TO: DALI~&S ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS q~_~ATE OF ALASKA],) INDEXED ~--r~ND~RD AL ASKA PRODUC 7 ION Date: 02/12/88 TI: 78547 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to this offlce: A-26 01/27/88 A-29 01/30/88 A-32 01/28/88 B-20 01/28/88 B-29 01/27/88 C-12 01/31/88 C-35 01/31/88 G-19 02/01/88 G-26 01/30/88 H-22 01/25/88 3-21 01/29/88 N-22 01/24/88 S-18 01/30/88 U-8 01/23/88 X-2 01/24/88 X-7 01/27/88 X-27 01/26/88 Y-2 01/09/88 Static Survey It II fl I! I! 11 II II II II II I1 I1 II II 11 II I1 I! II II II I! GO Camco GO Camco GO Camco Camco GO Camco Camco GO Camco GO Camco Camco Camco Camco C~mco Recel . :j RECEiVE · ~,~,~ Oil & G~s ConS. Cu,,,,,.., ...... ""~""'~ Anc!".,crag~ Victoria Aldridge I NFORMAT I ON CONTR~_ Wel I Records LR2-1 Standard Alasl~a Production Cornpan~ 900 East Benson Bouh. PO Box 19661? Anchorage. AIo~,l~o 99519-6612 !9071 564.5 I INDEXED DASL~LAS ,~co STANDARD CHEVRON ALASKA PRODUCTION EXXON Date: 08/05/87 TEXACO 78106 T0: T~: MOBIL PHILLIPS STATE OF ALASKA REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by slgning a copy of this letter and returning it to this office: A-1 A-22 A-26 A-29 A-32 A-35 D-9 D-25 D-26 D-27 D-28 D-29 G-19 G-25 G-31 H-21 H-22 H-24 H-26 J-22 U-2 U-6 U-8 U-12 X-2 Y-l-2 07/09/87 07/12/87 07/09/87 07/11/87 07/13/87 07/13/87 07/21£87 07/10/87 07/10/87 o7/07/87 07/22/87 07/22/87 07/08/87 07/08/87 07/07/87 07/25/87 07/25/87 07/25/87 07/25/87 07/27/87 07/17/87 07/17/87 Camco Static Gradient II I! II !1 II I! !1 II II II I! II I1 I1 II II II II II II II !I I1 II II 11 II II II I1 I! II II 11 II !1 II I1 I1 I! II II II 11 II II I! II II 11 !1 II II II II !I !1 II 11 II 11 07/16/87 " " " 07~27/.87 ' O7 15/87 ~.,~ Aldridge CONTROL Standard Alasl~a P~odu¢lion Company 900 Ease Ben,on Boulew P.O. Bo~ 196612 Anchorage. Alaska ~519-~12 1~7) 564-511 I DALLAS ARCO CHEVRON EXXON INDEXED STANDARD ALASKA PRODUCTION TEXACO Dale: 03/31/87 TO: MOBIL TI: 77804 PHILLIPs STATE OF ALASKA GEOSC IENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submll-fed herewith. Please acknowledge receipt by signing a copy of this leHer and returning. If to this office: ' B-7 Perf. Record 03/17/87 #1 C-38 Production Profile 03/12/87 #1 D-3 WOPITS 03/03/87 #1 G-1 Flowmeter/Temp. 03/18/87 #1 G-19 ~ Fullbore Spinner 03/15/87 #1 H-13 Production Profile 03/15/87 #1 H-17 Production Profile 03/11/87 #1 J-2 Completiom Record 03/12/87 #2 J-5 Perf. Record 11/16/86 #1 K-5 Perf.'Record 10/03/86 #1 M-i4 Step Rate/Injection Profile 03/21 Q-5 Perf. Record 10/01/86 #2 S-13 Production Profile 02/25/87 #1 Y-22 Perf. Record 09/06/86 #1 Y-24 WOPITS 03/14/87 #1 Y-24 Perf. Record 10/28/86 #1 11500-11848 Sch 5" 10825-11137 Camco 5" 10300-10660 Camco 5" 9750-10079 Camco 5" 11250~11500 Sch 5" 9200-9520 Camco 5" 10250-10600 Camco 5" 10000-10283 Sch 5" 9990-10360 Sch 5" 8800-9740 Sch 5" /87 #i 10200-10750 Camco 5'e 10000-10333 Sch 5" 10800-11201 Camco 5" 10500-11374 Sch 5" 13150-13531 Camco 5" 12700-13462 Sch 5" Date Founded ,- ~ nd. ~io. ,~ 182OT ~-:ka 0il & Gas Anchor Victoria Aldridge ~Nf0RMAI~ON CONIROL We~ Records LR2-~ .Slandard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6617 (907) 564-51 I I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 01/19/87 TO: MOBIL TI: 77666 PHILLIPS STATE OF ALASKA GEOSC IENCES M-'rANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: ~ G-11 ~"~G-19 'H-9 H-9 ~H-9 ~M-25 ~ R-2 ~ S.-12A 7-8 ~Y-8 Temp. 11/16/86 f~l 10-3200 GO 5" CCL/Perf. 12/06/86 ~1 9830-11095 GO 5" CCL 12/01/86 ~1 9800-10210 GO 5" CCL/Perf. 12/30/86 ~1' 10550-11503 GO 5" CCL/Perf. 12/13/86 t~1 8750-10100 GO 5" Temp. 12/18/86 f~l 9400-10300 GO 5" Cont. Flow. 12/18/86 ~1 9400-i0050 GO 5" Prod. Profile 01/03/87 ~1 10650-11020 Camco 5" Injection prOfile 01/04/87 ~1 9300-10000 Camco 5" CCL/Perf. 12/08/86 f~l 8700-10215 GO 5" Temp. 12/07/86 f~l 11433-11900 GO 5" Cont..Flow 12/07/86 f~l' 11500-11850 'GO 5" Recelved Date A unit al the original Stondor(I O.I Co,npony Fou-ded in Cle,.elond. Ohio. ,,, 1870 Standard Alaska Production Compa~ 900 East Benson Bou,~.urd P.O. Box 196612 Anchorage, Alaska 99519-6612 (907i 561-5111 January 9, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating and perforating the well. Yours very truly, JAB: JAM ~ J. A.' B~'grgp~on Operations Enclosures (4) cc: J. L. Haas, MB12-1 Well RecOrds, LR2-1 w/10 G-19 Well File A unit of the or;ginol Standard C~I Compa'~¥ Founded in Cleveland Ohio 1870 . STATE OF ALASKA ALASI :)IL AND GAS CONSERVATION COMI~ ,~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging _% Perforate ~, Pull tubing Alter Casing ,_- Other ~ 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, At top of productive interval 410' SNL, 2133' EWL, At effective depth 575' SNL, 1580' EWL, At total depth 587' SNL, 1547' EWL, Sec. 12, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM 5. Datum elevation(DForKB) K.BE = 67.06 6. Unit or Property name Prudhoe Bay Unit 7. Well number G-19 (21-14-11-13) PBU 8. Approval number 583 9. APl number 50_029-21599 10. Pool Prudhoe Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 11600 feet Plugs (measured) 9093 feet BKB 12. Effective depth: measured true vertical Casing Length Size Structural -- Conductor 70 ' 20" Surface 2663' 13 3/8" Intermediate 10555' 9 5/8" Production -- Liner 1259 ' 7" Perforation depth: measured 11362' - 11448' 11554 feet Junk (measured) 9065 feet B:KB Cemented Measured depth True Vertical depth BKB 8 cu.yds. 110' 110 ' 3808 c.f. 2703' 2640' 575 c.f. 10595' 8386' true vertical (subsea) 8876' - 8931' Tubing (size, grade and measured depth) 448 c.f. (two intervals ) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 10183'; 4 1./2" SSSV at 2070' Stimulation or cement squeeze summary Mud acid treatment Intervals treated (measured) 11396' - 11448' (two intervals) Treatment description including volumes used and final pressure See attachment 10341'-11600' 8187'-9093' 13. Representative Daily Average Production or Injection Eata OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation Would not sustain flow 1410 752 30 227 14. Attachments Daily Report of Well Operations ~ Copies of Logs and Surveys Run .~-_- 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Sign~ed~ Form lO-4(~Rev. 12-1-85 ''~'/~ TitleSupervisor Production Operations Date/'?'$7 Submit in Duplicate Well G-19 (21-14-11-13) PBU STIMULATING/ADD'L. PERFORATING OPERATIONS 12/27/86 A mud acid treatment of the original perforated intervals was performed with treatment fluids as follows: 1600 gal. 15% HC1 3300 gal. 6% HC1 - 1.5% HF 1600 gal. 3% NH4C1 brine 500 gal. gelled 3% NH4Cl brine w/420# BAF Note: Treatment fluids, excluding diversion stage, were nitrified with 300 scf/bbl, nitrogen. 12/30/86 Installed and tested lubricator to 3500 psi. Rigged up Gearhart and perforated'the following additional interval using 3 1/8" Densijet carrier guns at 4 spf: 11362' - 11396' MD BKB (8876' - 8897' TVDss) Put well on production and tested. jm 1/9/87 Standmd Alaska Production Company ~ East ~enson Boulevard P.O Bo~ 196612 Anchorage, Alaska 99.519.6612 (907! .564.511 I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 01/06/87 TO: MOBIL TI: 77645 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD AL ASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: D-27 Perf. Record 08/13/86 #1 8600-9688 Sch 5" D-28 Perf. Record 07/30/86 #1 9500-11108 Sch 5" E-7 'Perf. Record 07/23/86 #1 8850-9440 Sch 5" E-7 Perf. Record 08/15/86 #1 9330-9438 Sch 5" E-9 Perf. Record 08/22/86 #1 10500-10900 Sch 5" G-1 Perf. Record 08/26/86 #1 8700-10051 Sch 5" G-19 Perf. Record 08/29/86 #1 10680-11524 Sch 5" H-21 Perf. Record 08/11/86 #1 9200-9930 Sch 5" H-22 Perf. Record 08/12/86 #1 8690-9940 Sch 5" N-3 Perf. Record 08/10/86 #1 10900-11746 Sch 5" N~3 Perf. Record 08/20/86 #2 10900-11708 Sch 5" Q-5 Perf. Record 07/20/86 #1 9250-10318 Sch 5" Q-3 Perf. Record 07/27/86 #2 8795-9170 Sch 5" Rece i ved , aska, ---c- \ ~.,~. ,.. -.ij~ / Aldridge ~ ~~4,~Til~N'i C0N TROL Date. .OJ[ .& (~as (~0115. (.;Ollll'ill~!rm Well Records LR2-1 F~nded m Cle.elo~. C~%~o. m 1870 Standard Alaska Production Co m pc, 900 Eost Benson Boutevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907i 561-5111 November 19, 1986 /(,' '' ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate and perforate the well. Yours very truly, JAB:J~~ Enclosures (6) cc: J. L. Haas, MB12-1 G-19 Well File // A-. Bragg U~ upervisor Production Operations A umt of the original Standard Oil Compor'y Founded in Cle~e~o,~d Ohrc ir, 1870 STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMr SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon -- Suspend _- Operation Shutdown - · Re-enter suspended well - Alter casing k Time extension _-- Change approved program _-- Plugging ~- Stimulate ~. Pull tubing- Amend order- Perforate ~ Other- 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, At top of productive interval 410' SNL, 2133' EWL, At effective depth 575' SNL, 1580' EWL, At total depth 587' SNL, 1547' EWL, Sec. 12, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM Sec. 14, TllN, R13E, UPM 5. Datum elevation (DF or KB) KBE = 67°06 6. Unit or Property name Prudhoe Bay Unit 7. Well number G-19 (21-14-11-13) PBU 8. Permit number 86-100 9. APl number 50-- 029-21599 10. Pool Prudhoe Oil Pool feet 11. Present well condition summary Total depth' measured true vertical 11600 9093 feet Plugs (measured) feet BKB Effective depth: measured 11554 feet Junk (measured) true vertical 9065 feet BKB Casing Length Size Cemented Structural ,- Conductor, 70' 20" 8 cu.yds. Surface 2663' 13 3/8" 3808 c.f. Intermediate 10555' 9 5/8" 575 c.f. Production -- Liner 1259' 7" 448 c.f. Perforation depth: measured 11396' - 11448' (two intervals) true vertical (subsea) 8897' - 8931' Tubing (size, grade and measured depth) 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 10183'; 4 1/2" BVN at 2070' 12.Attachments Description summary of proposal ~ Measured depth 110' 2703' 10595' 10341'-11600' True Vertical depth BKB 110 ' 2640' 8386 ' 8187' -9093 ' Detailed operations program ' BOP sketch 13. Estimated date for commencing operation November/December 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Sign'~eed ~/~/~/~~~i~--~ Title Supervisor Production Operations Date [/-/~" ~ /J/ A. Bragg F~ Commission Use Only Conditi~;rf~s of approval Notify commission so representative may witness ~ Plug integrity Q BOP Test Q Location clearance Commissioner Approved by Form 10-403 Rev 12-1-85 I Approval No..~~ b y or d er o f //'¢w¢/',~ the commission Date Submit in triplicat~ Well G-19 (21-14-11-13) PBU STIMULATING/ADD'L. PERFORATING PROPOSAL After the initial perforating of Well G-19, the well would not sustain flow. Therefore, a mud aCid treatment of the perforated intervals is proposed with treatment fluids as follows: 2100 gal. 15% HC1 4200 gal. 6% HC1 - 1.5% HF 2100 gal. 3% NH4C1 brine 420 gal. gelled 3% NH4C1 brine w/420~ BAF Note: Treatment fluids, excluding diversion stage, to be nitrified with 300 scf/bbl, nitrogen. If the well will not sustain production after the mud acid treatment, we propose to perforate the following additional interval at 4 spf: 11362' - 11396' MD BKB jm DAL].~AS ARCO CHEVRON TO: EXXON TEXACO MOBIL PHILLIPS GEOSCIENCES INDEXED STANDARD ALASKA PRODUCTION Date: 11/17/86 TI: 77519 ' REFERENCE: SAPC CASED HOLE FINAL LOGS . The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to thls office: - _. . "'~' E-15 CH/CNL ' CET ' :" - ~ G-19= Cement AnalySis H-22 CBT ,. ~X~N-! !A Perf. Record -~,..u~ ~Q_- ~6 Perf. Record CNL Monitor 06/14/86 f~3 9800-10760 Sch 5" 06/16/86 f~3 · 9400-10180 Sch 5" 06/15/86 f/l! 11452-12250 Sch 5" 06/27/86 ~1 10335-11540 Sch 5" 06/07/86 ~1 8730-9974 $ch 5" 06/12/86 ~/1 9250-10644 Sch 5" 06/27/86 (~1 11000-11337 Sch 5" 06/18/86 ~2 11750-12828 Sch 5" Received Date A ,.,.n.,! of ,he c~'9'n<:,l $,u~,do,(i ,'D,,I Fot.~,ded ,.n C~e,t,4ond. Oe,,o .... - An, he Slanda~d AJas, l'a P~odu¢l~on Company P.O. ~ 19~12 Anchoroge, AIo~ko ~519-~12 (~7) 564-51 I I DALLAS ARCO CHEVRON INDEXED STANDARD ALASKA PRODUCTION EXXON TEXACO Date: 11/13/86 TO: MOBIL It: 77515 PHILLIPS :" sTATE] OF ALASKA GEOSGIE~GES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being subml~ted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to thls office: - "~ A-29 Caliper 10/22/86 #1 2-10310 Camco 5" ~'~ B-8 Caliper 10/23/86 #1 18-8740 Camco 2" ~ B-24 Temp. 11/02/86 #1 5400-9728 Camco 5" ~ D-10 Caliper 10/24/86 #1 38-9789 Camco 2" ~ G-5 CH/CN~L(3 3/8") 06/14/86 #1 10300-11160 Sch 5" ~ G-19 CBL 06/23/86 #1 10226-11539 Sch 5" ~ G-!9 CBT 06/26/86 #1 10100-11544 Sch 5" ~ H-21 CBT 06/06/86 #1 8750-9916 Sch 5" ~'~ H-25 Perf. Record 06/22/86 #! 9500-10752 Sch 5" ~ J-! F!owmeter 11/03/86 #1 8700-9120 Camco 5" '~ M-14 EPL 09/04/86 #3 10250-10750 Sch 5" Q-7 Ch~ (3 3/8") 06/17/86 #3 10950-12152 Sch 5" "~ R-26A Temp. 10/20/86 #1 Surf-2000 Camco 2" "~ S-Ii Spinner 10/19/86 #- 9100-9650 Otis 5" "~ X-15 Caliper 10/26/86 #1 29-8855 Camco 2" '~ ~ X-23 Collar 06/12/86 #1 10071-10190 Sch 5" ""--~- Y-23 CBL 06/22/86 #1 10005-11604 Sch 5" Rece i ved O~.~__ _/- ~.~.~.: 0il& ~a,~ Certs. Cnmmic~;~ fou-ded ,n Cle-elond ~,o. ,n 1870 Victoria Aldridge INF~%ATION CONTROL Well Records LR2-1 Standard Alaska · Production Compan 900 East Benson Bou~,. ~rd P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-.5111 November 13, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, PFB: JAM ~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 G-19 Well File P. F. Barth, Supervisor Re servo i r/Production Surveillance Unit I A unit of the omgir'o! Standard Oil Compo"¥ Founded in Cle~eJar~d Oh,¢ in 1870 - STATE OF ALASKA ALASK IL AND GAS CONSERVATION COMM 'ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~- Perforate _~ Pull tubing - Alter Casing -- Other ~ 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 67.06 Feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1535' NSL, 2276' EWL, Sec. 12, TllN, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, Sec. 14, TllN, R13E, UPM At effective depth 575' SNL, 1580' EWL, Sec. 14, TllN, R13E, UPM At total depth 587' SNL, 1547' EWL, Sec. 14, TllN, R13E, UPM 7. Well number G-19 (21-14-11-13) PBU 8. Approval number 305 9. APl number 50--029-21599 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: 12. 11600 9093 measured 11554 true vertical 9065 Casing Length Size Structural -- Conductor 70 ' 20" Surface 2663 ' 13 3/8" Intermediate 10555 ' 9 5/8" Production -- Liner 1259' 7" Perforation depth: measured 11396' - 11448' feet Plugs (measured) feet BK~ true vertical (subsea) 8897' - 8931' Tubing (size, grade and measured depth) feet Junk (measured) feet BKB Cemented 8 cu. yds. 3808 c.f. 575 c.f. Measured depth 110' 2703' 10595' 448 c.f. 10341'-11600' True Vertical depth BKB 110' 2640' 8386' (two intervals) 8187'-9093' 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV(type and measured depth) 9 5/8" TIW packer at 10183'; 4 1/2" ~-. at 2070' Stimulation orcementsqueeze summary ]986 Intervals treated (measured) Treatment description including volumes used and final pressure Alaska 0ii & Oas C0n~. Anchorage 13. Prior to well operation Subsequent to operation RepresentatiVe Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Will not sustain flow Tubing Pressure 14. Attachments Daily Report of Well Operations .~. Copies of Logs and Surveys Run - 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Signed ~/'~. d.~/'~ '~, ,~. ~'~~ TitleSupvr. Form 10-404 Rev. 12-1-85 tJ Res/Prod. Surveillance I Submit in'DulSlicate PERFORATING DATA - Well G-19 (21-14-11-13) PBU 8/28/86 Pressure tested tubing and inner annulus. 8/29/86 Installed and tested lubricator to 3500 psi. Rigged up Schlumberger and perforated the following intervals for initial production using 2 7/8" Hyperdome guns at 4 spf: 11396' - 11406' MD BKB (8897' - 8904' TVDss) 11416' - 11448' MD BKB (8910' - 8931' TVDss) Ail depths are referenced to BHCS/GR, 6/20/86. Put well on production; would not sustain flow. _ . 9/1/86 Shut in well to prepare for initial static pressure survey. 9/4/86 Ran initial static pressure survey at 8800' TVDss. Left well shut in. jm 11/12/86 Slando~d AIo ~.k,", Produ¢llon Company PO ~, 196612 Ancho~oge. Alosko 99519 6612 (907~ 564 51 I I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 10/09/86 TO: MOBIL T#: 77393 PHILLIPS ~: i ;-:'i sTATE :0'F ALA'~ ::.-.,;~ _;..:. ~...-:_~__ _.,~.;i. _-_<-1.~ ~. GEOSCIENCES STANDARD ALASF ', PR©D .JC 1-1C), J REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge recelpt by signing a copy of this letter and returning it to this office: - CET 03/02/86 J)2 11000-11986 Sch 5" CET 03/18/86 J)l 9000-9786 Sch 5" CET 03/20/86 JJl 9100-9875 Sch 5" CET 03/19/86 ~/1 10200-11180 Sch 5" CCL/Perf. 09/17/86 ,~/1 9700-10250 GO 5" CCL/Perf; 09/27/86 ~/1 9700-9940 GO 5" CLT 03/08/86 ~/1 8700-9648 Sch 5" CCL/Perf. 09/21/86 ~/1 7900-9217 GO 5" GCT 06/12/86 '~1 32-6711 Sch 5' CCL/Perf. 09/22/86 ¢')1 9402-10657 GO 5" EPL 03/15/86 ~,~3 9350-9850 Sch 5" CBT 03/07/86 ~1 8900-9629 Sch 5" CBT 06/24/86 ~1 8600-9780 Sch 5" CCL/Perf. 09/23/86 Jr~ 1-4 10500-10950 GO 5" GCT 04/18/86 -~/1 0-10510 Sch 5" Standard Alaska Produ¢lion Company 900 East Benson Boulev P.O. Box Anchorage. Alaska 99519-6612 (907) 564-51 I 1 INDEXED TO: DAL/_~S A~CO CHEVRON EXXON TEXACO MOBIL PHILLIPS, STATE OF ALASKA GEOSCIENCES (Transmittal Only) STANDARD ALASKA PRODUCTION Date: 09/11/86 TI: 77323 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this lea-far and returning it to this office: ~-~ A-31 ~-A-34 '-B-29 ~C-32 ~D-6 ~-D-27 --D-29 ~G-19 ~'-H-21 '--H-22 '"~R-23 -~'U- 11 ~U- 12 Flowing Gradient 08/19/86 Camco " " 08/23/86 " BHPD & PBU 08/10/86 GO Static 09/05/86 Otis Static 08/30/86 Camco Static 09/06/86 Otis Static 08/29/86 Camco Static 08/30/86 Camco Static 09/04/86 Otis Static 08/20/86 Camco Static 08/27/86 Camco BHPD & PBU 08/08/86 GO BHPD & PBU 08/02/86 GO BHPD & PBU 08/02/86 GO Rece I ved Dote Alas',~a Oil & Gas C]oI~$. Commission Ancho,aga Victoria Aldridge LR2-1 INFORMAT ION CONTROL Wel I Records LR2-1 A un,t al the o,,gmol Stondn,d C~I Co,npcmy Founded ,n Cle-elond. Oh,o. ,n 1870 Standard Alaska Production Company 900 East Benson Boule~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 August 4, 1986 ALASK/~ PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well G-19 (21-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Approvals, for the above-named perforate the well. Form 10-403, Application well. This contains our for Sundry proposal to PFB: JAM¢ Enclosures (g) cc: J. L. Haas (MB12-1) G-19 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. RECF'i'?ED ...... 19-~' alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM! SION APPLICA'IION FOR SUNDRY APPROVALS 1. Type of Request: Abandon -- Suspend - Operation Shutdown - Re-enter suspended well -- Alter casing - Time extension- Change approved program--_ Plugging _-- Stimulate-~ Pull tubing- Amend order- Perforate 2 Other 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 1535' NSL, 2276' EWL, Sec. 12, TllN, R13E, UPM At top of productive interval 410' SNL, 2133' EWL, Sec. 14, TllN, R13E, UPM At effective depth 575' SNL, 1580' EWL, Sec. 14, TllN, R13E, UPM At total depth 587' SNL, 1547' EWL, Sec. 14, TllN, R13E, UPM 5. Datum elevation (DF or KB) KBE = 67.06 feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number G-19 (21-14-11-13) PBU 8. Permit number 86-100 9. APl number 50--029-21599 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth' measured true vertical 11600 feet 9093- feet BKB Plugs (measured) Effective depth: measured 11554 true vertical 9065 Casing Length Size Structural -.- Conductor. 70' 20" Surface 2663" 13 3/8" Intermediate 10555' 9 5/8" Production Liner 1259' 7" Perforation depth: measured true vertical feet Junk (measured) feet BKB Cemented Measured depth True Vertical depth BKB 110' 110' 2703' 2640' 10595' 8386' 8 CU. yds. 38'08 c.f. 575 c.f. 448 c.f. 10341'-11600' 8187'-9093' RECEIVED Tubing (size, grade and measured depth) 'A J6 "" ~ 1985 4 1/2" L-80 to 10183' with 4 1/2" tailpipe to 10291' Packers and SSSV (type and measured depth) Alaska 0ii & Gas Cons. 6orrlmissi.r.,~, 9 5/8" TTW packer at 10183'; 4 1/2" BVN at 2070' Anchorage 12.Attachments Description summary of proposal ~ Detailed operations program -' BOP sketch~ 13. Estimated date for commencing operation August 1986 14. If proposal was verbally approved Name of approver Date approved 15. I.hereby certify that the fore.q~ng is true and correct to the best of my knowledge Si~\ed P. / B~a ~J~/~. r Title Supvr' Res '/Pr°d' Surveillance I Date (/f //~ Commission Use Only Conditions of approval Approved by Notify commission so representative may witness r- Plug integrity ~ BOP Test Q Location clearance Commissioner Approval No. .... by order of the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate well G-19 (21-14-11-13) PBU INITIAL PERFORATING PROPOSAL We propose to perforate the following intervals for initial pro- duction during August 1986 at 4 ~spf: 11396' -11406' MD (8875' -8904' TVDss) Ref. BHCS, 6/20/86 11416' -11448' MD (8910' -8931' TVDss) Ref. BHCS, 6/20/86 A lubricator will be installed and tested to 3500 psi for all well work. A SSSV will be set and tested in the ball valve nipple at 2070' following perforating operations and testing. jm 7/23/86 BASIC SYSTEM MAKEUP PACKOFF' HAND PUMP GREASE SEAL FLOWTUBE F"LOWLINE GREASE LINE FLOWLINE VALVE GREASE MANIFOLD ! RISER ~LGREASE I RESERVO~ BOP Ancho;~'a~je Standard Atasl~a Production Compare 900 Eosl 8,enson Boul~ J PO Box 196612 Anchoroge, Alosko 9~519-6612 (907) $64-5111 INDEXED DALLAS ARCO CHEVRON EXXON TO: TEXACO MARATHON MOBIL PHILLIPS STATE OF ALASKAq'i GEOSCIENCES REFERENCE: STANDARD ALASKA PRODUCTION Date: 07/11/86 TI: 77175 SAPC OPEN HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by slgnlng a copy of thls letter and returnlng It to this office: DAL/UNIT / STATE .~ GEOS: G-19 DIL 06/20/86 #1 10595-11594 GO 5" & 2" G-19 BHCS 06/20/86 #1 10595-11570 GO 5" & 2" G-19 CDL/CNLog-Poro 06/20/86 #1 10595-11596 GO 5" & 2" G-19 CDL/CNLog-Raw 06/20/86 #1 10595-11596 GO 5" & 2" STATE ONLY: Magnetic Single/~hot pirectional Sur~ey Gyroscopic Direp~io~. Sfi/~Ve~ :l,'/ Date k / - "' A un,~ ol ~he o,',g,n¢~l $1¢~,',clo,(I O.I founded ,., [{¢-e{on¢l 0~',,o..', {FIFO DIRECTIONAL SURVEYS Date: 6/6-17/86 Date: 06/27/86 Job//: 0686-006 Job#: AK-BO-60038 Victor~'a Aldridge LR2-1 I NFORMAT I ON CONTROL Well Records LR2-1 STATE OF ALASKA ALASKA oIL AND GAS CONSERVATION C.,MMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Standard Alaska Production Company 86-100 3. Address 8. APl Number P. O. Box 196612 Anchorage, Alaska 99519-6612 50-029-21599 ..... ~ 9. Unit or Lease Name 4. LoCation of well at surface~LCC 3745' SNL, 3004' WEL, Sec 12, TllN, R13E, UM Prudhoe Bay Unit At Top Producing Interval ! II 10. Well Number SNL, 3147' WEL, Sec. 14, TllN, R13E, OM 410' G-19 (21-14-11-13) PBU At Total Depth ~B. H. __--ZC~__~ 11. Field and Pool 587' SNL, 3733' WEL, Sec. 14, TllN, R13E, OM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) J 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool KBE = 67.06'I ADL 28285 12. Date Spudded6_6_86 13. Date T.D. Reached6_20_86 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffshore 116' N°' °f C°mpleti°ns6-24-86 N/A feet MSL oza.e 17. Total Depth (MD+TVD) :18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 11600 ' MD 9093 ' TVD 11554' MD 9065..' TV: )YES ~ NO [] 2070 ' feet MDI 1802 ' 22. Type Electric or Other Logs Run DIL, BHCS, CDL/CNLog-Poro, CDL/CNLog-Raw 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT, PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond~.ctor 110' 26" 8 cu. yds. Concrete 13-3/8" 72# L~80 Surface 2703' 17%" 3808 cu. ft. Permafzost 9-5/8" 47# L-80NSCC Surface 4799' 12%" 9-5/8" 47~ L-80Butt. 4799' 10595' 12¼" 575 cu. ft. Class G w/ friction reduc 7" 26~ L-80 10341' 11600' 8%" 448 cu. ft. Class G .5% Halad 344 w/ 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD LWL interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4~" 12.6# L:-80 10292' 10183' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9-5/8" x 13-3/8'' Downsqueeze annulus with 282 cu. ft. Permafrost C followed bv 125 bbls dry crude oil. 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS~OILRATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVI-IZY-API (corr) Press. 24-HOUR RATE 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. FOrm 10407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ,' 30. GEOLOGIC MARKERs ' FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 10617 ' 8403 ' Shublik A 10651' 8430 ' Zone 4 10749' 8505' (Top Ivishak/~ alderochit) 31. /ISTOF ATTACHMENTS 32. ' I hereby certify that the foregoing is true and correct to the best of my knowledge Division ~ Drilling /~ /~ Signed ' ~ ~ Title Engineer Date_ / / INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Sohio Daily Drilling Report -- PBU June .~, 1986 at 0600 hours Rig' Nabors 1 Well- G-19 (21-14-11-13) AFE # 120486 0600 Depth' ' Day' -1 24-Hour Ftg' ' Water Used' Current Operation' Rig Move. Moving to G-19. MUD TYPE- WT' VIS' PV' YP' FL' SOLIDS' TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H' Sohio Daily Drilling Report -- PBU June 6, 1986 at 0600 hours Rig' Nabors 18-E Well- G-19 121-14-Il-13) AFE # 120486 0600 Depth' ' Day' -2 24-Hour Ft§' ' Water Ilsed: Current Operation' Hook up complexes. Rigging up on G-19. MUD TYPE- WT' VIS: PV- YP' FL- SOLIDS: TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H- Rig- Nabors 18-E Well' G-19 (21-14-Il-13) Solmio Daily Drilling Report -- PBU June 7, 1986 at 0600 hours AFE # 120486 0600 Depth' 1445' Day: 1 24-Hour Ftg' 1445' Water Used' 2000 Current Operation- Drilling~ Accept rig at 0900 hrs. 6/6/86. Spud G-19 at 1700 hrs. 6/6/86. Drill to 647'. Trip for bit. Drilling at 144.~'. MLID TYPE-Spud Mud SURVEY MD WT:8'9 VIS'275 PV-16 YP-61 FL-15 SOLIDS'4 TEMP-48°F ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H' Sohio Daily Drilling Report -- PBU June 8, 1986 at 0600 hours Rig' ~bors 18-E Well' G-19 (21-14-11-13) AFE # 120486 Current Operation: 0600 Depth' 2717' Day' 2 24-Hour Ftg' 1272' Water Used' 2800 Drill to 1628' Trip for bit and BHA. Drill to off and directi'onally drill to 2717'. Short trip. 1800'. Kick CBU. MUD TYPE-Spud Mud WT:gj3 VIS'200 PV-IO YP:60 FL'lB.0 SOLIDS'6.5 TEMP'46°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 2 1961 5~7 S55j8W 1961 9.72 7.02 7.95 2.66 4 2180 15~2 S62.8W 2176 50.21 26.98 43.49 3.62 6 2429 25j7 S63jlW 2409 135.68 66.96 119.77 4.54 8 2666 35j 1 S66.7W 2612 258. 118.96 230.90 2.69 1018H' Sohio Daily Drilling Report -- PBU June 9, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-Il-13) AFE # 120486 0600 Depth: 8919' Day: 3 24-Hour Ftg: O' Water Used: 1400 Current Opera ti on: N/U BOP~ CBU~ Short trip. POH. Ran 13-3/8" casing to 2705'. with 4095 sks Permafrost. Install wellhead and BOPE. Cemented MUD TYPE- WT:8.9 VIS:37 PV:5 YP:5 FL:20 SOLIDS:9 TEMP:N/A°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDI~NATES DLS · , lO18H: Sohio Daily Drilling Report -- PBU June 10. 1986 at 0600 hours Rig' Nabors 18-E Well' G-19 (21-14-Il-13) AFE # 120486 0600 Depth: 3328' Day: 4 24-Hour Ftg: 605' Water Used: 1400 Current Operation' Drilling. NU and test BOPE. RIH to FC. Test casing to 3000 psi. Drill FC and 20' cement. Test casing to 3000 psi. Drill FS and lO' new hole. Ran FIT to .74 psi/ft. Drill to 3203'. Trip for bit and BHA. Drilling at 3322'. MUD TYPE-GEL WT:8.9 VIS'35 PV-3 YP-4 FL:24 SOLIDS:4 TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 9 2782 36.7 S67,2W 2706 326 145.31 293.60 1.47 10 2877 38.2 S65.2W 2781 384 168.35 346.58 2.20 11 2969 40.7 S64.5W 2852 441.94 183.15 399.57 2.77 12 3062 41.6 S65.3W 2922 502.95 219ill 454.93 1.12 lO18H' Sohio Daily Drilling Report -- PBU June l l, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-11-13) AFE # 120486 0600 Depth: 5785' Day: 5 24-Hour Ft§: 2463' Water Used: 1050 Current Operation: Drilling. Drill to 5152'. Trip for bit and BHA. Drilling at 5785'. MUD TYPE-Gel/Water WT:953+ VIS:38 PV:5 YP:4 FL:14 SOLIDS:7.5 TEMP: N/A°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 15 3741 44~6 S65:6W 3407 977 S416 W888 0.07 17 4760 43:6 S6657W 4135 1688 S707 W1538 0.24 19 5490 43~ 9 S67.4W 4669 2l 86 S902 W1996 O. 10 lO18H: Sohio Daily Drilling Report -- PBU June 12, 1986 at 0600 hours Rig' Nabors 18-E Well' G-19 (21-14-11-13) AFE # 120486 0600 Depth' 6773' Day' 6 24-Hour Ftg' 988' Water Used' 1400 Current Operation' GCT~ Drill to 6114'. Trip for bit and BHA. Drill to 6773'. POH. RU wireline to run GCT. MUD TYPE-Gel/Water WT:9~3+ VIS:38 PV-4 YP-7 FL-10 SOLIDS-7.5 TEMP'76°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 20 5?85 44'3 S69-1W 5027 2528 1029 2314 21 6514 45'4 S73'0W 5402 2701 llSO 2666 22 6702 45'8 S73j7W 5534 3035 1188 3795 0.35 0.56 O. 34 lO18H: Sohio Daily Drilling Report -- PBU June 13, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 121-14-Il-13) AFE # 120486 0600 Depth: 7515' Day: 7 24-Hour Ftg: 742' Water Used: Current Operation: RIH; Ran gyro survey; Drill to 7515'. Trip for bit and BHA. MUD TYPE-Gel/Resine WT:9;5 VIS:34 PV:7 YP:4 FL:7.6 SOLIDS:8 TEMP:89°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 23 6711 45;65 S72;27W 5544 1231 2782 24 7195 45~8 S73~3W 5882 3383 1334 3113 0.16 25 7415 44~6 S73;OW 6037 3538 1379 3262 0.55 lO18H: Rig' Nabors 18-E Well' G-19 /21-14-Il-13) Sohio Daily Drilling Report -- PBU June 14, 1986 at 0600 hours AFE # 120486 0600 Depth' 8570' Day' 8 24-Hour Ftg' 1055' Water Used' 875 Current Operation' Drilling. RIH and drill to 8119'. Trip for bit and BHA. Drilling at 8570' MUD TYPE-Gel/Resi nex WT:9.7 VIS-35 PV-7 YP-4 FL:6 SOLIDS'lO TFiMP'84°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDInaTES DLS lO18H- Rig: Nabors 18-E Well: G-19 (21-14-11-13) Sohio Daily Drilling Report -- PBU June 15. 1986 at 0600 hours AFE # 120486 0600 Depth: 9610' Day: 9 24-Hour Ftg: 1040' Water Used: 875 Current Operation: Drilling. Drill to 8609', Trip for bit and BHA. Drilling at 9610'. MUD TYPE-Gel/Resinex WT:9~8 VIS:35 PV:6 YP:5 FL:5.8 SOLIDS:lO TEMP:gl°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES 28 8925 43; 7 S73.7W 7123 4585 S1666 W4272 29 9353 41 ~ 3 S73~ 7W 7438 4873 S1747 W4549 lO18H: DLS 0.42 0.56 Sohio Daily Drilling Report -- PBU June 16, 1986 at 0600 ho~rs Rig: Nabors 18-E Well: G-19 (21-14-11-13) AFE # 120486 Current Operation: POH. Drill 0600 Depth: 10,184' Day: 10 24-Hour Ftg: 574' Water Used: 1400 to 9670'. Trip for bit and BHA. Drill to 10,184'. POH. MUD TYPE-Gel/Resi nex WT:9j8 VIS:34 PV:5 YP:5 FL:5.8 SOLIDS:lO TEMP:96°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 30 9595 40~2 S74.0W 7622 5030 S1791 W4701 0.46 31 10,004 38.3 S74jlW 7938 5288 S1860 W4956 0.49 lO18H: Sohio Daily Drilling Report -- PBU June 17, 1986 at 0600 hours Rig: ~labors 18-E Well: G-19 (21-14-11-13) AFE # 120486 0600 Depth: 10,600' Day: ll 24-Hour Ftg: 416' Water Used: 875 Current Operation: Lay down 12-1/4" BHA. Drilled 12-1/4" hole to 10,600'. POH for 9-5/8" casing. MUD TYPE-Gel/Resinex WT:9.8' VIS:35 PV:5 YP:6 FL:5.6 SOLIDS:lO TEMP:N/A°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 32 10462 38.1 S76.lW 8298 5570 1931 5225 0.15 33 10538 38.0 S76.5W 8358 5617 1942 5270 0.35 34 10600 38.0 S76.5W 8407 5655 1951 5308 0.00 1018H: Sohio Daily Drilling Report -- PBU June 18, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-Il-13) AFE # 120486 0600 Depth: 10,600' Day: 12 24-Hour Ftg: ' Water Used: 900 Current Operation: RIH. Ran 9-5/8" casing to 10,595' and cemented with 575 cu. ft. Class G. Installed and tested packoff. Tested BOPE. RIH wit~ 8-1/2" bit. MUD TYPE-Gel/Resinex WT:9.8 VIS:37 PV:6 YP:4 FL: SOLIDS:lO TEMP:80°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H: Sohio Daily Drilling Report -- PBU June 19, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-11-13) AFE # 120486 0600 Depth' 11,143' Day: 13 24-Hour Ftg: 543' Water Used: 2000 Current Operation: Drilling. Drill FC and 50' cement. Test casing to 3000 psi. Drilling 8-1/2" hole at 11,143'. MUD TYPE-Gel WT:9.0 VIS:37 PV:6 YP:5 FL:7.6 SOLIDS:4.5 TEMP:90°F SURVEY MD ANGLE DIRECTION TVD SECTION COORD I NATES DLS lO18H: Sohio Daily Drilling Report -- PBU June 20, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-11-13) AFE # 120486 0600 Depth: 11~600' Day: 14 24-Hour Ftg: 457' Water Used: 1400 Current Operation: POH. Drill to ll,600'. Short tripj CBU. POH for logs. MUD TYPE-Gel/Polymer WT:9.0 VIS:38 PV:4 YP:4 FL:8 SOLIDS:4.5 TEMP:77°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H: Rig: Nabors 18-E Well: G-19 (21-14-11-13) SAPC Daily Drilling Report -- PBU June 21, 1986 at 0600 hours AFE # 120486 0600 Depth: ll,600' Day: 15 24-Hour Ftg: ' Water Used: 800 Current Operation- RIH. POH. Ran open hole logs. RIH for wiper trip. Repair draworks brake. RIH. MUD TYPE-Gel/Polymer WT:9.0 VIS:38 PV:4 YP:5 FL:8.8 SOLIDS:45 TEMP:°F SURVEY MD A)~LE DIRECTION TVD SECTION COORDI)~TES DLS lO18H: SAPC Daily Drillin§ Report -- PBU June 2P_, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-11-13) AFE # 120486 0600 Depth: ll,600' Day: 16 24-Hour Ftg: ' Water Used: 525 Current Operation: RIH. RIH. CBU. POH. Ran 7" liner from ll,600' to 10,333' and cemented with 380 sks Class G. POH. RIH with 8-1/2" bit. MUD TYPE-Gel/Polymer WT:9.0 VIS:40 PV:5 YP:6 FL:7.2 SOLIDS:4.5 TEMP:77°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H: SAPC Daily Drilling Report -- PBU June 23, 1986 at 0600 hours Rig: ~bors 18-E Well' G-19 (21-14-11-13) AFE # 120486 0600 Depth' 11,554' Day: 17 24-Hour Ftg' ' Water Used' Current Operation' POH. Lay down drillpipe. RIH and drill cement from 10,022' to TOL at 10,330' CBU. POH. RIH with 6" bit. Test liner lap to 3000 psi. Cl'ean out to FC. CBU. Displace wi th 9.6 NaC1. Test liner to 3000 psi. POH. MUD TYPE-)~CL WT'9.6 VIS:NACL PV' YP'Brine FL' SOLIDS: TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS lO18H' SAPC Daily Drilling Report -- PBU June 24, 1986 at 0600 hours Rig: Nabors 18-E Well: G-19 (21-14-Il-13) AFE # 120486 0600 Depth: 11,554' Day: 18 24-Hour Ftg: ' Water Used: 875 Current Operation: Displacing tubing w/diesel. Ran CBL log, Ran 4-1/2" tubing with tail at 10,291', packer at 10,183' and SSSV at 2070'. NU and test tree to 5000 psi~ Displace tubing to diesel. MUD TYPE-NaC1 WT:9.6 VIS:NaC1 Brine PV: YP: FL: SOLIDS: TEMP:°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS . , lO18H: SAPC Daily Drilling Report -- PBU June 25, 1986 at 0600 hours Rig' Nabors 18-E Well' G-19 (21-14-11-13) AFE # 120486 0600 Depth' 11,554' Day- 19 24-Hour Ftg- ' Water Used' Current Operation' Movin§ Rig. Set packer and test to 3500 psi. Downsqueezed annulus with Permafrost C followed by dry crude. Release rig at 0900 hours 6/24/86. Move to G-31. MUD TYPE-NaC1 WT-9.6 VIS- PV- YP- FL' SOLIDS' TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDI 'NATES DLS 1018H' sper, r, -sun July 2, 1986 Mr. Michael D. Martin Standard AK Production Company P. O. Box 196612 Anchorage, Alaska 99519-6612 Re: Our Boss Gyroscopic Survey Job No. AK-BO-60038 Well: G-19(Secl2 TllN R13E) Prudhoe Bay, Alaska Survey Date: June 27, 1986 Operator: T. McGuire Mr. Martin: Please find enclosed the "Original" and sixteen (16) copies of our BOSS Gyroscopic Survey on the above well. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard Western Area Manager Enclosures SPERRY .... LIN.._ WELL_SURVEYI NG_.CL~HF ANY, STANDARD AK PROD CO. G-..1'3. F'RUDHOE BAY ALAoKA ANCHORAGE ALASKA _COMF'U]]ATI ON_DATE ',JUNE :30, 1986 :. DATE OF SURVEY dUNE 27, ........ BOSS_GYROSCORICL. SURVEY. dOB, NUMBER AK-BO-60038 KELLY BLISHING ELEV. ,OPERATOR=D,__HARGER_, VERTICAL SEC. TICnN C:ALCLILATED ALONG CLOSLIRE PAGE._z_' .1 67.06 FT. MEASURED DEPTH . TRUE ..................... !DUB~',SEA .................. ,C;OURSE ....... CC!URSE_ ............. DOG=LEG VERT I CAL VERT I CAL I NCL I NAT I ON D I RECT I ON ' SEVER I TY DEF'TH DEF TH DEG MIN · DEGREES DEG/100 _TOTAL RECTANGULAR COORD I NATES NORTH/SGLITH EAST/WEST VERTICAL F; ' C'~' ' ,-ECTI , 400 500 60O 700 800 699.99 '-'~. 6.=.2 93 0 22 . 'q'-' '22 79'.=',,' '.--/'.=) 7._ ~.. '.--/:3 0 900 899.99 832.93 0 21 1000 999.98 932.92 ' 01~ 27 1100 1099.98 1032.92 0 30 1200 1199.98 1132.92 0 26 1300 1299.97 1232.91 0 18 1400 1399.97 1332.91 0 13 1500 1499.97 1432.91 0 19 1600 1599.97 1532.91 0 10 1700__1699.97 163~,91 0 30 1800 1799.94 1732.8:3 1900 1 ,-.o¢, R'='"' · c .... >. :_::A 1 ~ ._-.'. 74 20¢]0 1999. ·;2'2 19:32. 16 · -.~ ),..': . 2100 ~( Y7 56 '-"~0," 2194 52 2300 ..'"?Ac/~_ _... 64 2400 2382.25 2450 2427. :35 250A 2471 ~ U.=. 0.50 'sd127.46 , - ' 2222.58__ 2315· 19 , 2:360.29 1 44 3 55 :3 18 12 27 15 49 · 20 2 24 13 26 53 S 41. 0 E S 48.80 E S 44.80 E S66. OE S 86.89 E S 74.60 E N 89.69 E N 74.60 E S 73.50. E S 74.19 E · N 78.19 E. __...q~_2'_2._,_6 ?__W. S 35. OW S 37.60 W __'.3 5(__.-,_.. 19 W S 61.89 W S 61.69 W S 6_L~:0 W S 62.30 W S 63.69 W 2404.32 0.00 O. o0 0._......1.. 8 0.00 0.08 S O. 37 o'-' O. 1 O. ~0 .0.,._(!7 0.09 0.07 0. C '~' 0.14 0.17 0..__ ~ 2__ 0.14 0.17 0.09 0.1 E: 0.69 1.37 2·19 .4_,_74 4.28 3.36 4.20 5.49 0.69 S 1.06o'-' ';' 01 '-' ~ ,,_..:_.=. .=; 3.29 S ,..'.44 S 3./-.9 '-' 3.62 S 3.6 I._S__ 3 74 3.7.9 3..,.88__S 5.26 9.22 S 15 ,_.? 5_S 25.05 S 36.60 51 .... 30_S___ 69.07:3 78 ¢'~ - ('). 00 0 - 00 0.25 E -0.21 0,_66 .... = -Q., 50 1.07 E -0.77 1.4.3 ~ -1.A0 !._,.7.4 .... S - !_,_13 ..... 2. 15 : -1.36 /~ .... -1.65 '2 = - '=' - 3 ~.! 0 .......... '~.:;___ o A':, - -'2 32 ,~.(.~ _ -2. 'P 1 5 :_ 1.1 .... S __-3 ,__6~L 5. '.-.? 1 C -4.3~ 6.55 S -4.97 __7.00 E __ .=, 4 7.46 E -5.' 7 ':"=' E -6 17 · i_i ,_1 I 7.,_/_-.. 1_. E -5 6.31 E -4.20 3. '35 E - 0.0'.-? 4,...74.._W __ 9_,._78____ 20.26 W 27.45 41.79 W 51.59 102.04 W 119.21 1 '=' 1 '='/- W 14 0 ~':/ ~ · .~,,. _i . ~ . 1_4.2., 55.._W .......... 1.64 .... 1_3 190. .09 W ~.-'='16.42 · - ..: 7._ 36 242 1 :=-: W '-" '~. .' ';' 96 .,..4 61 ... W .............. 3:32.,..5 .~.-~ ........ 26CK~ 2556.43 '2489.3:7 2700 2638.46 2571.40 __29 40 _~_(?Z~,_I..~_W~. 33 45 S 65,30 W 35 58 S 65.80 W 36 .... 54 ........ S..._i~" 6 ,.D (:.)__. W.__ 4.13 111.64 2.24 135.29 !..,.02 ......... 159 ..31 ..... STANDARD AK PROD CO. G-19 PRLIDHOE BAY ' · ALASKA '' ANCHORAGE ALASI<A DATE OF SURVEY JUNE 27, ,r.,-. I-' '1-'-' '' ' " !';OME,.U_TA.T..InN_DATE ' ~0~.o ~¥RuoCUF~ L: SURVEY I ' · :30, 1.86 ' NUMBER AK-BO-60038 VERTICAL '.SECTION CALC'ULATED ALONG C:LOSURE 1986 KELLY' I° ' ::B.I~HING ELEV. = ''67.06:"FT.' .! !: '. ~.OP'. ERA.TO~D~-HARGER. ': · TRUE__ .E;UB_,..;3EA ................. CO. URE;E ..... COL!R.~E ..... [!rJG_-.LEG TO_T. AL MEASURED VERT I CALVERT I CAL ' , .'INE. LINATION' DIRECTION: ::SEVERITY:?'.:.'ii.i -' C'OORDINATES REL:TANL, I.ILAR. DEPTH DEPTH ' ['EF'TH DEG M I N · DEGREES :i:'.::'iDEG/100 :": :: NORTH/c, JUTH' "]' EA::,T/WE.:,T'=' ~-' , ... . :. . . , · . · VERTICAL' i:. SECTiO~, 2.900 3000 3100 3200 : · 3300 3400 o._ 00 3600 2797.67 2730.61 2874.04 2806.~8 2948.14 2881.08 3020.32 2953° ~6 30~1.46 3024:40 3233.56 3166.50 3304.74 3237.68 39 8 S 64.39 W 2.58 184.92 S 352.47 W 41 15 S 64.19 W 2.11 212.91 S 410.61 W 43 6 S 65.50. W 2.05 :.2...4..1_,...4.~. S__471 ,_38_W · ::: : 44": :::.. 30' S 65':30 W ::::.:. 1,'41:1'..' ::270 ~4 534 ~1 W 44 ::.!:?'47 S ~ 6~..=, ' 1 29-.0 ] 66:'.q: 5'P,q ] 13 W 44' ::: 46:':' Si 65'30'W Q.'_(.~7. /3:2_S.!.J_.5_~ 6.6_.~.,_0,?_W_~ 44 34 S 65.50 W 0.24 358.41 S 726.(:)2 W 44 40 S 65.69 W 0.17 387.43 S 789.98 W 393.93 458.07 ~2~_,Z~Z ..: 663' 77 __ZS.3.,_'Rl,~ 803.92 879.90 3700 3800 ...3~00 '4000 '4100 4200 4300 3375.~6 4400 4500 .4600 47(])0 48¢)0 4 ~¢)(') .13447.27 3308.90 44 30 '.-5 65~89 W 0,~_'2 416,~(") :~ a5~.(')1 N ?_4;>.~.A____ ~.'q~'°'~o~.,.,. 21 . S :. 66:. 1.9:: W ' . .:.: .0.21 444.66 S 71 ~'.. 0'" o ,.o W 1013.74 ~ 6,.:,,0, 473.17 S ., o~ 40 W ' lr'°~.,,~,~.. 89 :' %: .... '-. ~' . 31 3660.44 3731. 3802.8(:) 44 . o.'X ::" 44 39 44 46 44 16 · ' 44.:: 41 ...S.66,'. 0 W ' 0 44 ':'. 615 60 S . 1:303 .=,1 .. : - . I . --. 44' 4; S"65 "W"'" ................ 1_O._.46..,_Y_,~_.W S 66.10 W 0.0(:) 530.24 '.'=". 1111.04 W ':' 66 10 W 0 11 55,'_-': 74 '~ · . .:, 1175 37 W S 66.10 W c)~5(-) 5,~-~ .~ ~- o.~ . ................. · =,~..~__,_~.:.--~, 1~.....,:--4_7__N '" 0.63' '644.10 S' 1367.39 W (2._~1 . _!.:_72~_.43 S ") ~' l_4o( ..... .:,6_N O. 14 700.64 S 1494.22 W 0.72 728.43 S 1557.23 W Q_,_9 ~ 7..55.._ 8'2.___~. 16..1_9..,_'~2_ W 0.40 782.90 S 1682.49 W 0.07 807.64 S 1745.0:3 W 4~ 59: ...$__66_,__0LW;': . 43 51 S 66. 0 W 43 11 S 66.3~ W 43 42 50 S 66.80 W 42 52 S 66.89 W 3593. :38 3664.44 :37:35.74 3874.14 3:807.08 3945.61 3878.55 4~!Z_~) 3?50.44 4089.53 4022.47 4162.05 4094.99 4234.98 4167.93 5000 4308. 13 4241.07 51(30 4381.44 4314. :38 4454..,__61 ......... 4.:38Z,_55 .... 4...5: .... 4_________~__67.1.Q__W 4527.77 4460.71 , 42 52 S 67.60 W 4600.86 4533.80 43 12 S 67.69 W .... 467~.~ . 46_06_._48. ..... 4~ :~ .'q_3._67..:SZ_(~_la .. 4745.81 4678.75 . 43:52 , S 68.89 W 4817.85 4750.7:] ' 43. :' 56 S 169.. 191' W' :. .0_._Z.'5__~_836.27 S. .1_807.._78_W_ . 0.40 862.52 S" 187(.').69 W 0.35 888.4:E: S '193:3.81 W 0~35 9...L4_.__48.__E; .. 15~77_._38_ W_ 0.83 939.98 S 2061.61 W 0.22 964.77 S 2126.38'W 5:300 54(:)0 55¢...](:) . .4889,_.90 .......... 4822,.84.. '--' '=" .... 4o .....,1 ............ S._d,:.-.~,.3~,W~~O..~.7 5600 5700 ................... .=,_o., .... 00.: . _ 1224.19 1294.34 1434.. 1503.82 1.573.._10_ 1642.25 1710.91 184Y. 16 1715.03 1~83_._.0Y._ 2051.13 2119.27 2.18Y~8~ 2256.?5 2326.28 :~ 89..,2:E:_S .... 2191_.. 7'5._W ........ '2 375.._61 ..... ' . ~PERRY=,. UN.. WELL_SURVEY I NO LCOMPANY STANDARD AK PROD CO. PRUDHOE BAY VERTICAL SECTION CALCULATED ALONG CLOSURE ANCHORAGE ALAoKA DATE OF SURVEY ,_II_INE 27, .COMPUTATI ON_I]ATE ...... c ,",- .... - .... '~'" ......... BJ::,._,._~oYRO~COF..I E .... ~.,URVEY. dUNE :30, 1786. dlDB NUMBER AK-BO-600:3::: ALASKA KELLY BUSHING ELEV. = 67.0~ FT. ' _:.OPERATOR=D,--HARGER ?7o6 ..................... ]_ ................... TRLIE ....................... SUB-SEA ................ COLIRS;E ............. C:.OL!RS;E .............. DOG.LEG ..... TOTAL MEASURED VERT I CAL VERT I CAL I NCL I NAT I ON D I REC:T I ON~._ EVER I TY RECTANGLILAR COORD INA T E'.:; VERT I CAL DEPTH DEPTH DEF'TH DEG M I N DEGREES; DEG/100 NORTH/SOUTH EAST/WEST RECT I C .... ,, -. .... (.)o 4.961 89 4:.~':)4 :.-::-: 44 3 .':, 69. '"'- '-,'".':i ..... _-,'.-/ W 0.'.-"1 101:3 71 '-' ' ,*- · 0 ~ ." .- 6 '-"-' · .z.~ W 2465 O0 6000 5033.47 4~66.41 6100 ........5 ! Q 4.._.4,? ............ 5037.,. 43 6~00 5175 0:3 .... ,107.97 45 1 /~ --..: - .~._.:..,,,~ ,.:,._ 00 ": '-' 7 ,. ~w._,, 27 ._~ 176. · .:- 1 45 /'_,. 4 (.) C) _~__ 5 .'_.'-:1.5~'-' -' ' ,.! Z ............ :..~.4~_. ~..).-~, ........... 45 56 65C)0 ~:::84 64 ='-'~ ?,'-' ...... ,._ 17 4.=; 57 6600..54...,4 =. 07 ._P;':"-'"7.., o,. 01 46 5 6700 5.=;,';..':::. 4'-? ~aF,/- 4:-': 45 .=,8 ................. ..-...~-~-.. __-. ...... _.; .......... '~, .! ~_ %'..?_ - 6800 ' 67C~0 ' __70C_!0 38 S Z~:,._ 0 U 7100 24 :3 7:3.1 (') W 7200 30 S 73.30 W 7~(__')C)__ 4 S 73.30 W 7400 44 54 S 73.10 W 7500 44 26; S 72 ""'-' 7600 z;4 '")2 S: 73, 10 W 7700 43 49 S 7:3.30 W 7800 43 33 S 73.6(:) W :_--:C)00 42 39 S 74.10 W 8100 42 25 S 74.19 W 8200__ 43 26__S 74 ._.!_.~_..W 8'300 44 26 S 74.10 W 8400 45 7 S 74.1~ W 8500 45 44 '.:; 74.10 W 8600 45 48 S 74.30 W 8700 45 24 S 74.10 W .............. 8 8 0 0 ...... Z 016,. ? 9 ........... 6 9 4 9,.'P 3 5593.00 5662.60 573c~ 40 5665.34 5802.45 ._,7._-,._,. 39 5872.60 5805. ~ ~4 5942.95 5875.89 601.3.67 5946.61 6084.77 6017.71 _~ ! 5~,_.2 ! .......... 6089.15 _ ~ ~ .... (')';' 6160.96 6300 32 /- '~':'':' '-' ~ 6373 ,_ 09 ........ 6306 ,. 0:3 6446.3y- 6379..:,q~' ~ 6520.07 645:3.01 ..... ~_~? ........ ~.~ ~0 ..... 6665.27 6598.21. 6736.24 6669.18 6806 41 6739 'R= 6876. 16 6809.11 6946. 12 6879.07 44 31 S 6~.60 W 0.48 44 .... ~L:! ........ ~_7.~.~0...- W ......... 0..._67 S 70.50 W 0.35 S:71.10 W 0.46 S _7_2_,_..! (%.....W. .......... 0,...86 S 72.30 W 0.14 S 72.69 W S 73. 0 W 5525· 94 ., 45 i,:57!.'.: S,73-0 W' 55?5.54 · 45 :'4'~ S 73.10 W 45 45 45 45 1038.16 S 2321.63 W 2534.82 1062,.,.25C_S .... 2;387,_76.,__.W ........2605......21__. : 1086.07 S 2454.54 W 2676.10 :1109.48 S ': 2521.75 W 2747.27 ....... !_!..32,..0.7_:_~;... 2589..,66_ W ............ 281.8.,..83_~ 1154.04 S 2658.09 W 2890.67 0.32 1175.68 S 2726.73 W 2962.59 0.24__11~.~.~_~ .... ~.Z~5,.~O._..W 30;~!.4_,_~1 0,00. 1217.92 S. 2864.26 W 3106.34 0.16,'. 1238.85 S ~ 2932.94 W 3178.07 0._.!~ ...... !.~59._7~_.S 3001._44_..W 324~.,~2 0.25 1280.54 S 3069.70 W 3320.91 0.17 1301.14 S 3137.93 W 3392.11 0.42__1321.56 S 3206.00 W__346~,_0'> 0.22 1341.99 S .3273.69 W 353'3.] 0.4:3 1362.55 S 3340.93 W 3603.97 ~,..1.6 !.~:83.,.P!_.S_ 3407·85 W __36Z3.,_88 0.56 1403.12 S 3474.47 W 3743.40 0.34 1422.80 S 3540.69 W 3812.3~ O.,_~2 1~.42.,_.~__~ 3~06._.53,_W__3880.,_88 0.45 0.25 1.00 0.68 0.61 1460.86 S 3671.90 W :3948.79 1479 t~.':: S ,. 7oo. 94 W 4016.26 1497.87 S~.3802.48 W ~4084.._24 1516.8:3 S 3869.24 W 4153.50 1536.07 S 3937.01 W 4223.81 ~1555.5:3 S~4005,,_54_W ........... 429.4 1575.04 S 4074.4~ W 4366.43 ~ ' I o94.49 S 414:3 . ~._';'~ 'W 4437 .7:3 ...... 161.3.76_S .......... 42!_1 11.'_ W ................ 4508 .... 14 0.15 0.41 (-)c, .."....- U ................................................................... F ERRY..-...~: UN_WELL,...URVEYI NG,COMPANY ANCHORAGE ALASKA STANDARD AK PROD CO. G.'..-.. 1 ? COMPUTATI ON_DATE PRL!DHnE BAY ,.IUNE :2:0, 1986 ALASKA , VERTICAL SECTION CALE:ULATED ALONG CLOSLIRE · PAGE±_4 DATE OF .,URVEY JUNE 27, 1'286 .~B J;:,o_!3 YRU.=,I, UF. I L;_.SLIRVEY~ JOB NUMBER AF,~BJ-6. KELLY BUSHING ELEV. = 67.06 FT. OPERATOR~D._HARGER_ MEASURED DEPTH TRLIE ............................ SLIBT. SEA ............. !;O!JRSE ....... .C¢!URSE ~I [,Cl6~ ~ E 6~ I TOi~A ~ VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY I RECTANGULAR CL'IORD I NATE?'; DEPTH DEPTH DEG MIN . DEGREES rlEG/lO0":. NORTH/SOLITH EAST/WEST , VERT I CAL ~ · · . EC.T I r 8'.~00 7088 86 7021 '"" ' · . ,=,(.) 43 46 S 74 0 W O..,'="-",=, 1 A'~"'." ,=,'-' 1 '"" 4277 "---,,'-'..I"'1 W .'2C)00 7161 '-"-' .,,,:, 7094 .... :,. 43 15 S 73.69 W 0 == '-' ..,., 1651.96 S 4c, 44.11 W I~' 9100 7234.63 7167., ~, _7.. ............ ..4. a_~...¢~a ........ ,~L.._Z.¢ ,. ~ !-_W ............ L] ,._7_.2 ....... !6.7A ,.95_S ..... 440'P._4?_..W ...... ?200 7308.82 -/241.76 41. 39. ~'-' 74. 0 W 0.'~9~. 16A9 ....49 S 4473 92 W , 9300 7383 61 7316 ~= 41. ' '- '~ 0 13 1707 79 °= *='~-~ 73 W .... , .1 S 74. ,' 0 W ?400 -~" --~.-o...70 ......... 7.:3¥~;L.._64 ..... ~..;1.41 7 S 74. OW 0,~0 1._725~'-T*'=~ :=: .46©1.,....1_W ................. L ~ .... . ..... 95¢]¢) 75:~4 ':31 7467 2F, 40 36 S 7:3.'-"' ,_~ W 0 F, . 4664.0::: W ........- . . . 4 1744 14 o'-' · ~ ~' 23 . .. -- ._ $x600 7610 2'-2 7.4o. 40 30 S 73.69 W 0 12 1762.3:L~ S 4726..~ 1 W 4577.54 4646.28 ~Z..1_4..,_25 .... 4781.18 4847.44 4978.68 5043.60 9700 7686. ~6 7/, 19 98¢)0 7763 44 76?6 - I i . i., .9900 7841.0? 7774.0:3 0(~90 79 ! ?.,..~'9 ..... 785~_..,__! 4 0100 7997.43 7930. :37 020o 8075 98 '-" "-' - . ,=,uu,=,. ?2 ~.~_~)0 ~-2_...~1, ....................... 4.67 oOo7.'-' ~.'~' _ ~ 1 0400 8233.29 8166.23 0500 8311,84 8244, 79 0600 8390, 16 o~,.-,~, 0700 8467.68 8400.62 0800 8543.67 8476, 61 40 4 '" ' ...... __ __~ 73 89 W 0,~6 39 26 · 3,.-, 40 38 36 AR 27 .~.c: 0 38 11 38 '"~ o,~ , 18 38 35 39 45 41 10?00 8617.8? 8550.83 42 50 11000 8690.53 8623.47 43 58 11100 8761. ?P 8694.93 44 47 __11200 __ 8832.08 8765, 02 I i 1300 8900.39 8833.34 11400 8?66.77 88'.29.71 11500__?030,.75 ............. 8963..6'P_ 11600 .9093.39 9026.34 17 8 (~ '--37----..S ...... '''4--788.'.6 1----W ..... --5'10:3'--16~ 4.6___.1.2 .... ~_.ZS,,_..O__N II 47 36 S 72.10 W 4? 13 S 71.30 W .~1 ..... 1~ ..... S.__Z.O~5(:)_.W.._ 51 12 S 70.50 W 1798.00 S 4850.08 W 1815.05 S 4910.74 W l.~!....~_~ ._~?.70~5_.W____ 1847.76 S 5031.11W 1863.62 S 5090.?3 W 1894.33 S 5210.55 W 1909.35 S 5270.58 W .... 1_~2~60_S .... 5331.._1.0_W_ 1937.65 S 5392.68 W 1952.55 S 5455.94 W S 74. l0 W 0.64 · S 74.50 W' 0.8¢) __ S 74,80 W S 75.10 W 0.23 S 75.19 W 0.46 o 75.,._80 W C!..,,_.4.. 2 S 75.60 W 0.13 S 76.¢0 W 0.46 __S 77 ~ 19 W ~ 0..._~ S 77.10 W 1.17 S 76.39 W 1.62 '.3_75.~60 W__ !_..6.1 .. S 74.89 W 1.24 S 73.89 W 1.07 _. _1.,_56 1.~ --4 1.73 2.~0:3~ 0.00 5172.00 5234.87 _~2.~.7~1.~-L__ 5359.27 5420.95 5543. 5605.58 _56~..~? 5730.14 5794.75 1~68.._Z7__S .... 5520.95__W____ 1986.27 S 5587.40 W 2005.08 S 5654.77 W _2025 ._ 41_S~__5723.~1.3 __W 2047· 31 S 5792.78 W 2070.7? S 5863.78 W 2095..~4_S_ _5~36_,.37_W 2121.96 S .6009.85 W _586.1~45~ 5929.94 5999.73 6143.92 6218.69 ~2~5..52 6373.46 H!]R!.ZON.T. AL__.D!SPLACEMENT....- ........ :,,:,7.~,._.46~_FEET__AT .':a-,ith 7(') DEA'- :'~R MIN WEST_AT_MD_= _.ti/-'(')(] . ~ ~. ,-i ,-- .~.~., ,, .... . ...... ~ ~.~. · .................................... "t'l-I,.r;. F':AI CI.!I ATIFIN F'F'F',-'rrrHiF,'FC; APF f.:'hqC:Fr~ Fd,.l THF-- II!..--;F AF THRFF.. KITMFN'..--.;Ti.-.INAI RAFITII:-7: OF K:IIRVATIIRE METFIAFI, SPERRY=SUN_WELL_SURVEY I NG~COMPANY ANCHORAGE ALASKA STANDARD AK PROD CO. G= 19. L_ ....... COMPUTA TIO N_DATE____ PRUDHOE BAY dUNE 3(}, 1986 DATE OF SURVEY JUNE 27, 19:36 ,.lOB NUMBER AK-BO-600:38 ALASKA KELLY BUSHING ELEV. = 67.06 FT. ...................................................................................................................... i .................................... ~'_ ..................... __ .......OPERATOR=.D._HARGER INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA : 'TOTAL MEASURED VERT I C. AL VERTICAL :RECTANGULAR COORDINATEs' MD'TVD VERTICAL ............ lIEF'TH ......................... DEPTH DEPTH ................ NORTH/SOUTH ................. EAST/ NE:_-,T ........... D ! FFERENCE ............. C:ORRECT I (:.iN 0 1000 ........ 2000 3000 ............... .4000 ........... 5000 6000 .................... 8000 9000 .............. 1.0000 11000 11600 O. O0 -67.06 O. O0 O. O0 O. O0 99'..-~ .. 98 ................. 932 ..92 .... .7! ....44._ ~_ .......... ..4.._30_. E_ 0.._ 02_ 1~99.22 19:32. 16 15.95 S 4.74 W 0.7:3 2874.04 2AOA_. _. '-78.. _ 2. 12.9. 1 ._.':'410 ' 61 W 125 . ~6 _.358~X,..~: 1 ..................... 3522 , 25 ........... .~01 ..... .7.6__.:3 ....... 10~6,._ZS._.N ............410, 6~7" ...... 4308.13 4241.07 5033.47 4966.41 __57~2,.40 ............ 5665.,_~4 ...... 6446.39 6379.33 7161.38 7094.32 .... Z.~l.~..~20 .............. 7852..14 ........ 8690.53 8623.47 9093.39 9026.34 -,.'-. c-~0 7::,~... S 1682.49 W 1038.16 S 2321.63 W ..... 1.2~_._7.3._~; ....~!OQI_~;4__N .. 1460.86 S 3671,90 W '1651.96 S" '4344' 11 W 691.87 966.53 1_267_,.60 1553.61 ' '18'38.62 .183~..58_~._ .49.Z0..,_'.~_ W _ 1986.27,.,c' 5587.40 W 2121.96 S 6009.85 W 2080.. 80__ 2309.47 2506.61 _0..02_ 0.77 125.17 284..2.4_ 281.18 274.66 .~0.1~.07 286.01 285.00 242.~18 228.67 197.13 THE CALC:ULATION F'RCICEDLIRES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF, CURVATLIRE METHOD. STANDARD AK PROD CO. PRUDHOE BAY ANCHORAGE ALASKA DATE OF SURVEY dUNE 27, ·,PAGE_ 1786 INTERPOLATED VALLIE8 FOR EVEN 100 FEET OF SUB-SEA DEPTH MEASURED DEPTH L AR NORTH/SOUTH'!:: FFERENC I ON .0 67 167 367 0.00 67.06 -67.06 O. O0 O. O0 0. O0 0.03 S 167.06 267.06 367.06 100.00 :.' 200, 00 300. 467 567 667 467.06 567.06 667.06 400. 500. 600. 767 867 .967 767.06 867.'06 .967.06 700. 800. .900. 1000. 1100. 1200. 1300. 1400. 1500, 1600. 1700. 1067 1167 1267 1067. 1167. 1267. 06 06 06 1367 1467 1567 1367. 1467. 1567. 06 06' 06 1667 1767 1667.06 1767.06 00 1.38 S 1.62 E O. O1 00 1.83 S '2.00 E 0.01 00 2 · '-'"= ,:,,., S 2.47 E O0 -. ..:.~.:..:.:.:.'... :.. ..'.'::.:;-..; . :Z.:.78 :...: O. 01':'..: '. :-'.'.-:,:'..(". .: Y;";?v:!~',::::,?','.:: ,. .i:' . ': 0. O1 00 .:.::::; :i:!'::-:::.:::!':':.~.:?:::::~',:'.21.: .. oo ' ::i'i. ::?.? i:';!..::::?:!::'" ~ ;.' 4:-'~~ 00 ~.-~ 50 S 4.83 E 0.02 00 3.69 S 5.66 E 0.02 O0 : 3.:67 S 6.38 E 0.03 O0 ,:'?:::,:?:,'..:':.:..'L.:':::;.:::::.::;'.'. ..... : · -..'::':':"::"-:.':i"..::.::"..,:'~::'..':::,:T: '.. '>~,- ? - ' ':.' . .:.::.?...:....::..-:..::..<.:.:...:.:::'.:3 ,: 57 :,<.. ~ .,...:.:::.,;.:::..,,::.,-::.,:¥::::?:::.i~ ~,, u",7.:::. E:...:...:.....:......... ..... .:....:: 0.03 00 ":::': '::::,::. :::::::::::::::::::::::::::::::::::: ~_ _~'::" ~ :::i '::-:': ::.";'i,: :.:'::::i.:'..::~."~..'.:.,~.-~.:.:' ~-.' .": ..' ':.':':'::::'.':::. ".'.".'"..'~'..'":::...'..':~..'::..:<'::.:'.-',".~ ,...'.':..'...:".:: '...:.': ::¥'.' i'.'z..o.'~.'..' ' ."'.:'".' ,':"" O. 03 '' oo .... ::':.i'!:ii':":i::':::':"~!'f"!':':ii::i:::"3,'BO' '?..':..(:'i"?:!":":':i:::: :::7 i 78 :E.' cA,_.O_.~ OO ....":-'. 80 S . 7 .89 E O .03 00 4.44 S 6.89 E 0.04 · O. O0 O. O0 O, @0 0 ,. 00 ?':"":::'!:' ' 0.00 '. O. O0 O. O0 O, O0 0.'00 :. · '. i'. O' O0 i."'- O. O0 O. O0 0.01 STANDARD AK PROD CO. ...... G=1.9__ _ PRUDHOE BAY ALASKA ANCHORAGE ALASKA _.PAGEcL_7, ::' ~/~I DATE OF SURVEY dUNE 27, 19_.6 :'."JOB NUMBER AK-BO-600~o KELLY BUSHING ELEV. = OPERATOR~D..__HARGER 67.06:"FT. INTERPOLATED VALLEo FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE MEASLIRED:'.".:',..VERTICAL. DEPTH DEPTH ~ :..,.!.: . ,~ ......... .~, . _;...] . ,:. ... VERTIL. AL ..... REC..TANGLILAR Iz. OLRDINATEo 'MD-TVD"' DEPTH .N.,._C!~_TH~..O.,~!T_H __EAST'/..WE~.,T_ O.I. EF..ERENCE 'VERTICAL __.~ORREC_T_!...L_'~N 1867 1867.06 1800.00 1967 1967.06 1900. O0 2068 2067.06 2000. OA 2171 227 2495 '2612 2735 26:60 29~0 3125 3265 3406 _ 3547 3687 3827 3968 4109 -2167.06 21 oo. oo .226Z_...._0.6.._ 2367.06 2300. O0 2467.06 2400. O0 2567.06 2500.00 7.44 S 4.72 E 0.12 0.08 13.50 S 1.30 W 0.50 0.38 22.00 S 14.71 W 1.79 1.28 .:.:. 33.' 05 S.,,:. 35 .'..18. W ', 4.47 2 · 69 47.47 S,: __61.82 W 8.99 4.._51 65.94 S 96.11 W 16.34 7.35 88.20 S 140.38 W 27...~9 11.66 114.61 S 196.55 W 45.73 17.73 . ': 2867. ¢]6 : 28¢~A. (")¢'~ :'::i:]:?'? !i::i': :':]::'i:::if:ii 2_10 ,'24 2967.06 2900. O0 '248.76 3067.06 :3000.00 289.4.9 3167.06 3100.00 331.06 o :::' ...~ 4¢:~,-,, 1 ) W 65 S 487.49 W 158.°=~.,,., S 576.14 W · 198.56 S 666.25 W 239.44 :39.71 40.89 3267.06 3367.06 3467.06 3567.06 3667.06 .88' · . 279. ,' 320. · '360. 97 46 69 3500.00 492.85 S 1026.68 W 401.66 3600.00 532.89 S 1117.03 W 442.25 40.53 40.49 4~?_._'_2_.3 40.97 40.59 :{;TANDARD AK PROD CO. ...... !3=,1.9 DE, link,Il'il:' ,, ,,.,,.., ,,_,,_ ,..,,--,. ALASKA PERRY ........ UN_WELL.~URVE¥_i NG_COl ANF:HORAGE ALASKA DATE OF SURVEY JUNE 27, 1:986 :.'B_I,. H INO ELEV' = OPERAT_OR--B ,,.~ H~RGER ' INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH D_E.P_TH . DER_TH DEF:_T..H. i!:.i'.:::"!'iNL.-]_R_~/__S_C.!..L .......... ..E_A_S_.T_../_._WE~._T :CORREC:T I oN 4250 3767.06 4390 3867.06 4529 '3967.06 4668 :'4067.06 : 4806 4167.06 4943 4267.06 · _,0,=,0 4367.06 5217 4467.06 5353 5491 5629 5768 5907 4567.06 3700.00 573.01 S 12¢)7.56 W 3800.00 612.75 ~, 1297.11 W 3900.00 1~ 86, 34.: W 4000.00 :::69. 1'"'86: ,_ ':' 1474~' =,0 W ' C ' C} :' ~' ~ '~'" 4200.00 767.84 ':' .-, 1647.45 W 4300.00 804.40 S 1732.75 W 44C_! ~3..,..,(-..)(_-'~ ........... 8_4. 9. ,_~%0__~ ........ .. 4.?67_.'._06 .4_.TQ¢?_,_Q 0 ~.~Z_,~ ~__~. _~08Q ~ 6_7._.N ............ 862.,_42, 4867.06 4800.00 ' '.-.981.56 S 2170.71 W 901.27 4.967.06 4:.~00.00 1015.47 S 2260.90 W 940.13 482.9? 40.74 ' ~.=_'.,_78 ~'-'~_-L~.~ 562' ' ' ' ': '""~ 78 98 676.89 37.07 713.32 36.43 7_4.~..,,_.~.~9 : 786 5';~ ..~(:'. 60 824 ] O0 ": 37.42 ".38.._41 38.85 38.87 6047 5067.06 5000.00 6188 6331 6~.74 6618 6762 5167.06 5100, O0 5267 · 06 5200.00 __5~7__.__06 _5~_00_,__00.... 5467.06 5400. O0 5567.06 5500.00 .':"'""::'1116,~5 ::?:::::::::::::.70 W'" "' 1064·01' ' ""42.40 "1J,__48-~_l__S_ :'::.~.~..4.Q,_7_~_W- ' l~tOZ-65 .... .43.,.6/_4 ... 1179.69 S 2739.61 W 1151.67 44.02 1210.08 S 283:3.61 W 1195.63 43. :?6 ANCHORAGE e,, ALA~,KA COMPUTATI ON_DATE ' I ~II_INE 30: 1986 i l i l ' · i STANDARD AK PROD CO. PRUDHOE BAY ALASKA PAGE ~ 9 ...... ~' 1986 DATE OF SURVEY 'JUNE .~.7~, ,..lOB NUMBER AK-BO-6oCoo i i KELLY BUSHING ELEV. = .,OF'ERATOR=D HARGER 67.06 FT. INTERPOLATED VALUES FOR EVEN IOOiFEET OF SUB-SEA DEPTH MEASURED ........ BERTH TRUE SLIB-SEA TOTAL.: 'I , · VERTICAL VERTICAL' :::RECTANGULAR ..C:OORDINATES· ::MD-TVD :VERTICAL __DERTH ............ , ......... DEF~TH._-:::~NOR. TH/~OUTH .... ==~E.AS~./WEST. DlllEEERENC:E.,_CORREC.~..ION 6906 5667.06 5600.00 1240.19 S 29:37.33 W 7049 ~76.7. ~'~6 ~7r~O. 00 1~7c. 08 S 3035.32 W 71.92 5867.06 5800.00 ' 1299.51 S 3132.53 W 7334 ._967 7475 6067. 7615 6167. 7754 6z~7. ~78~1 6367. 06 6100.00 1 :~::~:~. I 1C~ :~; 06 &2¢'~('~_ ... 00 1413 . ~,~z.=~ .:,"' 06 "' ~ 6o00.00 1440.48 c; ':: :3229' 15 W · ~'-~°~' 32 W 3418.01 W 3510.33 W 3601.12 W 1239.34 1282l,..~0 1325.04 1367.08 1408.12 1448.12 1487.03 15~4.6~ 43.70 43.17 :42.53 42,04 4!~_.05 40.00 38.91 37.66 °O~'° 6467 . 8163 6567 8302 '6667. 8443' 6767. 8586 6867. __8729 8869 7067. 9007 7167. 9143 7267. 9277 7367. 9411 7467. 06 6400 O0 : ,.. ,:' 1'466':0~: S 06 ' 6500:00 11 S . 06 06 06 06 06 06 06 06 : 66~,.00 :'":1517.31 S 6700.00 6800.00 6~00~00 7000.00 7100.00 : 7200.. O0 7300.00 7400.00 · '387O.,_~;3_W 1544.51 S 3966.83 W 1572.50 S 4065.48 W 1627.05 SIl . 4257.90 W 1653.46 S · 14349.24 W · 1703.75 S 4523.65 W 1728.01 S 4608.23 W ' ~..1.. Ol 0'.:l __1635._._45 __ 1676 I 65 1719. O0 176~__76 1802. 74 1840' 73 1910.84 1944.05 36.36 35' 77 ____ ~. o. 62 41.20 43.23 4..~ JL.~-' ':' 39.98 37.9?,' 33.91 :3:3.21 STANDARD AK PROD CO. ..... G=I..~ PRUDHOE BAY ALASKA .__~,PERR¥_--..,=,Uh ANCHORAGE ALASKA COMRUTAT~ON_DATE DATE OF SURVEY dUNE 27, 1.986 67.06FT. · ~ INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH MEASURED DEPTH VERTICAL VERTICAL::., REcTANOLILAR cOORDINATE~: DEP. TH ............... .r..!EF~.'.rH. . ..,..N_!-_-!~...T_.~._/...S. iL_'!.L~!TH_______.EAST/WE:S.T.. _D._I..E.EERENCE ,~;ORRE~LT_ION .9543 .9674 7567.06 7500.00 7667.06 .9804 ~33 10061 .7767.06 ~ . 7.,67 06 101o~"-'.:. 8067.06 10315 8167.06 7700.00 7800.00 :7.9~.,..~0 8000.00 8100.00 1751,.97 S 4691.04 W 1.976.07 32.03 1775.82 S 4.Z_7..~,..~_--..'.~_..W. ::.17.98,82 S W 2037,62 :. ' 30 17 1820.61 S:..77 W 2066 '21 28158 . . 18/-_, 1.84 .'.:.; 5084.19 14 212 ! · 62 27.46 1881.46 S 5160. 11 W 2148.70 27.08 10442 ~'~ ,:.;~67.06 10570 : 8367.06 106~9 '. i'.::i':8467,06 10831 8567,06__ 10967 8667.06 I 1107 :3767.06 11250 8867.06 8200,..(.!..C.~ ......... 1,9.'~..~e..2__~ .... 8300 O0 191'P.52 ~ '=' ' ' . · ':.:.:... ~,313 · 12 W 8400 O0 54 c; ~':~:'17 ' W 8600.00 1980.37 S 5565.54 W 8700. O0 2006.48 S 5659.60 W ~8800.00 2036..1.9 S 11400 8967.06 8900.00 :.::: :'2070..90 S 5864.10 W . ~¢~-zo .96 W 11557 9067 06 9000 00 2111 02 S ' ....:, i · I . . 1':1580 .908(~. 8~6 .9013.80 ' 2~_~6. $ "~'~ ~ =" - ~ .................. ., ,. ~d.~]~.~ . ::.- THE CALCLILATION F'ROCEDURES LISE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 2300.32 36.24 2340.08 3.9.75 2~.~.~ 43.~ · :.:::i 2433.3~ 1.49.76 · "::2490..90 ' 57.51 ,!:::2~.~_1~ ..... : 8.23 S?EFIR¥ -SIJIxl -70~0.00 5CflL. E :- 1 INCH TO lO00, O0 / lO00. O PRUOHOE BRT S'I'RNORRO RK PRO0 CO, 0-19 JUNE 27, 1986 flK-80-60038 TRUE ¸-60 HOR'f ZONTflL PROJECTLON --1000.00 --2000.00 --~000.00 Teleco Oilfield Set .~ of Alaska Inc, 61 16 Nielson Way Anchorage, AK 99§02 (907) 562-2646 19 June 1986 STANDARD ALASKA PRODUCTION CO WELL G-19 PRUDHOE BAY *"NABORS 18E 50B #506 Dear Sir, Please find attached a copy of the computer calculated MWD directional surveys for the above mentioned well. We at Teleco appreciate this opportunity to provide service .to Standard Alaska -ProdUction :Company ._. Teleco is committed to~ providing the highest quality of service and we would welcome any comments or questions concerning these surveys or any of our other services. SinCerely, Pat Havard Field Service Supervisor PH/el Enclosures A ~.f~,~lltl'i' COMPANY Date 06/18/86 TELECO OILFIELD SERVICES JOB 506 SURVEY CALCULATIONS Page Company: STANDARD ALASKA PRODUCTION CO Well: G-19 Location': PURDHOE BAY Rig: NABORS 18E TELECO Job # 506 TAK Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: 0.00 degrees 31.50 degrees 31.50 degrees 249.38 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT ,DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min ~eet feet feet feet feet deg deg/100' TIE-IN TO VERTICAL 1750.00 0.0 180.0 S 00 00 W 1750.00 0.00 0.00N 0.00E 0.00 N 90.000E 0.000 TELECO MWD 2086.00 11.8 242.1 S 62 06 W 2084.13 28.83 16.30S 24.67W 29.57 S 56.542W 4.933 2180.00 15.2 242.8 S 62 48 W 2175.52 50.61 26.45S 44.12W 51.44 S 59.058W 3.621 2303.00 20.0 241.7 S 61 42 W 2292.73 87.50 43.76S 77.02W 88.59 S 60.397W 3.912 1961.00 5.7 235.8 S 55 48 W 1960.64 10.14 6.50S 8.39W 10.62 S 52.233W 2.659 1836.00 2.4 229.7 S 49 42 W 1835.97 1.69 1.16S 1.37W 1.80 S 49.700W 2.791 TELECO Job # 506 TAK 06/18/86 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' 2429.00 25.7 243.1 S 63 06 W 2408.79 136.05 66.42S 120.37W 137.48 S 61.110W 4.544 2552.00 32.2 244.9 S 64 54 W 2516.36 195.29 92.50S 173.85W 196.93 S 61.983W 5.331 2666.00 35.1 246'.7 S 66 42 W 2611.25 258.32 118.39S 231.46W 259.98 S 62.910W 2.690 2782.00 36.7 247.7 S 67 42 W 2705.21 326.29 144.75S 294.16W 327.84 S 63.799W 1.469 2877.00 38.2 245.3 S 65 18 W 2780.63 383.98 167.78S 347.13W 385.55 S 64.203W 2.203 2969.00 40.7 244.5 S 64 30 W 2851.~6 442.25 192.58S 400.06W 444.00 S 64.295W 2.773 3062.00 41.6 245.3 S 65 18 W 2921.69 503.26 218.53S .~55.48W 505.19 S 64.368W 1.122 3125.00 43.5 246.3 S 66 18 W 2968.10 545.78 236.00S 494.33W 547.78 S 64.480W 3.201 3247.00 44.9 245.3 S 65 18 W 3055.56 630.66 270.86S 571.91W 632.81 S 64.657W 1.282 3741.00 44.6 245.6 s 65 36 W 3406.39 977.63 415.36S 888.26W 980.58 S 64.939W 0.074 4236.00 44.6 245.6 S 65 36 W 3758.85 1324.46 558.77S 1204.86W 1328.13 S 65.120W 0.008 4760.00 43.6 246.7 S 66 42 W 4135.14 1688.52 706.21S 1538.37W 1692.73 S 65.342W 0.240 4982.00 42.9 246.7 S 66 42 W 4296.84 1840.48 766.31S 1678.11W 1844.80 S 65.456W 0.316 5490.00 43.0 247.4 S 67 24 W 4668.67 2186.32 901.27S 1996.84W 2190.82 S 65.708W 0.096 5985.00 44.3 249.1 S 69 06 W 5026.83 2527.91 1027.87S 2314.18W 2532.18 S 66.051W 0.354 6514.00 45.4 253.0 S 73 00 W 5401.86 2900.75 1149.00S 2666.96W 2903.94 s 66.692W 0.560 6702.00 45.8 253.7 S 73 42 W 5533.40 3034.75 1187.49S 2795.65W 3037.40 S 66.986W 0.341 TELECO Job # 506 TAK 06/18/86 Page 3 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** TIE-IN TO GYRO 6711.00 45.6 252.2 S 72 16 W 5543.81 3034.34 1231.28S 2781.90W 3042.20 S 66.126W 0.000 TELECO MWD 7195.00 45.7 253.3 S 73 18 W 5881.99 3382.93 1333.75S 3112.63W 3386.35 S 66.805W 0.153 7415.00 44.6 253.0 S 73 00 W 6037.14 3538.57 1378.96S 3261.91W 3541.41 S 67.084W 0.509 7981.00 42.6 254.4 S 74 24 W 6447.,90 3927.75 1488.50S 8482.00 45.4 254.7 S 74 42 W 6807.35 4274.34 1581.21S 3636.52W 3929.36 3971.94W 4275.11 S 67.740W 0.392 S 68.293W 0.560 10538.00 38.0 256.5 S 76 30 W 8357.97 5616.11 1941.78S 5269.89W 5616.25 S 69.773W 0.353 10462.00 38.1 256.1 S 76 06 W 8298.12 5569.62 1930.68S 5224.38W 5569.71 S 69.718W 0.154 10040.00 38.3 255.1 S 75 06 W 7966.49 5310.17 1865.78S 4971.60W 5310.18 S 69.430W 0.455 9595.00 40.2 254.0 S 75 06 W 7621.90 5029.79 1790.78S 4700.24W 5029.83 S 69.143W 0.462 9353.00 41.3 253.7 S 73 42 W 7438.57 4872.31 1746.84S 4548.51W 4872.42 S 68.991W 0.561 8925.00 43.7 253.7 S 73 42 W 7123.04 4584.00 1665.82S 4270.97W 4584.33 S 68.693W 0.415 TELECO 0 i 1 ~ i ~ 1 d PLAN VIEW Serv ices g600 8000 6400 4800 9200 1600 0 WEST 16OD 3200 4800 6401~ 8000 9600 11200 12800 TELECO Oil{i~ld Sarvicas VERT I CAL PROJECT I ON ]] p- n W C] >. 0 1000 2000 BOOO 4000 5000 6000 7000 8000 gOOD 10000 1 DO0 2000 BOO0 4000 5000 6000 VERTICAL SECTION (~t) CO DEl; 38. lB ' DEC SOHIO ALASKA PETROLEUM CO. PAD- G (21-14-II-13) Controlled Drilling Consultants, Inc. LES HENDERSON . .:, ._ ,'~',:::,, 333-1552 .. .... . iNc.· / (90~) 333.1552 June 27, 1986 Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 RE: Magnetic Single Shot Survey Job No. 0686-006 Well G-19 (21-14-11-13) PrudhOe Bay Field North Slope, Alaska Date of Survey~ 6-06-86 to 6-17-86 Dear Mr. Rose: Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on the above well. The method used · in calculating thiS-survey was Radius of Curvature. The depth of the survey was 1750 to 10,600. Thank you for giving us this opportunity to be of service. Yours very truly, CDrr~'lle~ D3~illing ConsOl'rants, Inc. Terry ~V. H-ender son Directional Supervisor STANDARD ALASKA PRODUCTION i'IAGNETIC S!N(~LE SHOT SURVEY RADIUS OF CURVATURE NETHOD OF COMF~UTATiON ENGINEER TERRY HEENDERSON CO~IPUTED FOR CDC ~Y OCEANTECH(FM i:;!: E C 0 R D 0 F TRUE MEAS, DRIFT VERTICAL SUB DEPTH ANGLE DEPTH SEA DI R~.,~tJN:ED VERT t i750 O O i 836 2 24 1961 5 42 2086 't'I 4-8 2180 i5 12 230:4 20 0 2429 25 42 25:52 .32 12 2666 35 6 2,-"'82 36, 4.2 2877 38 i 2 2969 4 O 4.2 3062 4i :36 3125 43 39 ~247 44 54 · -_474 ~ 44 42:.56 44 ;.t6 4760 4~ 36 4982 42 .54 5490 43 0 18 35,97 2 084 .. i 2I 75,52 2292,7~ 2408 ,'?'9 25 I6,37 26'i i, 25 ">~' 05 22 2.85 '~ 67 292t 78. :2988 I O ~ 055 57 3406 3758 85 4-~ 35 14 4.296 84 ~, ;:s =, 94 I , ,..., f3 9 ; ,..~ , . i . ,. ~ 89 :S, 59 S 55 ,. 8 2 O 17,07 2 i 08,4. 6 · % 'D'-' ,~...,'~.,:t..~i 77, c.~ 2449,3: 25,-t4. t 9 :3G6,7 OW 2638 · 271,., TM, 5'"' 2784,6 2854,64 29 O ~ , 04 S6r-3.: 298, 8,5 i 3691,79 5;65,60L', 4 0 68, 0 422 '~ ":' ':' ': ~; 6 ? 0 W .,. , i' ~,.,. ~., ,.. , 460! ,E.'t SS7 "t' Cit ]' ¢~ L COORDIHATES CL OS STANCE U R E S A N ,'7; L E , 0 0 L:; 9 0 ,00 S 26,50 S 44 ~5E.,47 S i20 !? 2,5 6 S ! 7 ':~ tS,45 S 231 144,8 0 S 294 ~87 84 S ~,-,,. :'92,6J S 400 2i 8,59 S 455 ~38~ 05 S 494 270,92 S 571 . , . 559, O0 S t204 706,44 S i539 766,6i S i677 ':'~i =7 S i996 O O 35 36 ,6 ,":'; 99 .:, c'. 8 ,42 '; ,09 ,02 ?, ,87 '.'.3 7 ,25 ,5-.8 , O0 S 90 t i 0 29 5i 137 I96 259 327 · ,3 ~, ,w 443 ..505 97 S 62 53 4.2 W 83 S 63 47' 'i5 W 54 S 64- ii 37 W 99 S 64. t?' !2 W i:3 S 64. 2! :S9 W 2 79 I ;2 64i [3 .~..'::' t ¢ ¥ ':') 04 5 30 ! I 4 15 i::35i ~ 2: t 8 .3 i 5 ..::, =., .... iON , 0'0 , !, 7 i- -- 'i O, ':25 29, 86- 5. ,',) ~ 9,4 a",'7,99 'i .'3 $ , ;:?'4 ' i 96, i 8' 385, - 447_-',, 5 o. 50 ,,I-. 65 5'4..'7, :::., .? ::2,2 8 '::>7 9,94 i S';2: T, 4. 9 ii .:: q;4-'ti f'( .,..,. ,... , I844. i :2 SOHIO 6702 45 48 5533,,40 BOTTOM HOLE CLOSURE St~,,;I';;;L.E SHO]" SURgEY ,JOB NO A .....OAS6-OOE, RECORD OF SURVEY J E, f;; R '.~ F T SE'C. [.:".' l REC TOTAL COORDINATES 545~..;, 34 :i:.:', 7S , 70W 'i 'i 87 , 79 S 2795 C L 0 S U i;:.'. E :iii'.. ,'E',, ~ S T A N C E A FI O L E 3037~37 FEET 7 W ,4 ',7 S E C T i 0 N" ... SOHIO WELL 6-i9 ME~SUR.ED DEP]"H [.EP] H t67 267 367 467 867 i 067 i467 i567 1 667 i 767 186'7 i967 20~9 2i 71 2276 2495 26i2 27~5 2989 3i24 326:3 3545 Ai4D OTHEr',.' DATA F,"Oi;~ '"",'"";'~" I. .... r..,,c.r,r ~;:VEt,I . O0 Fi:.:.ET OF SUB SE:A DEPTH, TRUE V E R T Z C A L '"' ,:.~ UB ~,/ERT I CAL DEPTH' o E A 0 .~. F F E ~ E N C ~:: b 0 R R E; C T I 0 N TOTAL C 00 R D: f,.l A T E S i 6. '7, i, 08 0 26'?, 200 0 0 ,,o, , o 00 0 0 467 ,. 4 00 0 0 567, 50 O 0 0 667, 6 O O 0 O 7'67. 70 O ~] 8G F, 800 0 O ~ 067, J O OO 0 O i i 67. i i O~ 0 ~ 267, ~ ~:~ 0 O 0 O '1467, i 4 O 0 0 0 J 567 t ~ 00 '"' 0 'i 667, i ~S 0 o o O ~ 767. 'I 700 0 0 '1867, ~ 800 0 0 J 967. ~ 9 O 0 0 0 2 067, 2 O 00 1 i 2167, 21 00 ':~. .3 · 2467, 2400 .::~ 7 I ! 2567, 2500 45 ! 8 2867. 2800 i..':' ':,~. ...~ 0 3267, 32 00 2 ?' ;:: 4 i ;g 467, 3400 3:59 4 'i ,00 ,00 ,00 ,08 ,00 ,00 , O O 00 ,00 ,OO ,00 ,00 ,00 ,OO ,00 .06 i4.G9 39,54 57:72 79,94 i 06,26 ~3,4 05 ~5,S 44 285 66 ;..]75~S 9 S~7 i9 J5S 41 399:37 440 iS C 0 M P U T E R .... ;~: i J.U.~..! .b 7, U,~::, F' T. i,::B tS, L E V "' ""' 00 O0 ',...,' 00 00 0 O tJ 03: E: 90 $ 8,99 i 0 S, :E; 0 '2 0 .~, ," 337,4:;: c, ..... ~ .... ?" :,i 94 ~2, 70 i..'.~ SOHIO WELL MEASURED DEPTH 4i 87 45:,-,:7 4,9,4 t 5214 56~5 576~ 5902 6~82 6464 66 07 6702 AND OTHER DATA F~""~ EVERV ..... ;:':'¢EN 'l 00 FEET .OF .SO~ ':~="'~.h ~>EPTH '~'"' ii'.-'. E L E.v. 6,'?' '06 F T TRUE VERTIC~;L. SUB !'iD .... DEPTH SEA DIFF'EREHCE VERTICAL CORRECTIOH TOTAL ~767 42~? 4467 4S6'7 46G7 4767 4867 4967 5067 5167 5267 :35'00 399 ., c-, 08 4 ,¢ 3'700 49 0 3800 520 3900 559 400O 598 4 ~ O 0 636 4200 67'4 4300 7 t 0 440 O 7 "!', 7 4500 784 4600 820 4700 857 4800 895 4908 5000 9 5~00 ~. O~ 4. 5'.2.': 00 ~ 055 5~00 54 00 '~ I 39 5466 40 41 ,40 40 37 ~7 ~7 39 40 4.0 4i 4.2 29 480,87 $ 52i ,(.,,1 S 562,34 S 602,59 S 642, 02 S 680,6;2 $ 7i8,44 $ 75$, E~4 $ 7'92 , 3? S 828,82 S 90 i .. O0 S 9.76,70 S 972,, i 4 S '! OOT, 30 S '} 042,08 S f 075,7 O S 'I i 07,98 S 'I J.78,88 S ! i68,5i S i i 87, ? 9 8 i i2 'I 2 i 2., i 995 2 i 70 2259 2~5 0 2443 :~53'7 273 0 2795 SONIO WELL G .... I9 INTERPOLATED ',,'ALLIES FOR EYEN TRUE MEASURED YERTiCAL DEP Ti4 DEPTH 0 2000 I999, 3000 2875, 4000 3591 5000 471 E, OOO 5 0.",~8 ,, 6702 S,~N~;;i;L..E SHO'T SURVEV ,,.~08 NO R-0686-006 t000 F'EET OF' HEASURED DEPTH, SUE~ 28 08 4 :;:,:: 4 4,97i 5466 TOTAL COORD i NAT .Et,.. $ CONF"LiTER,,- STANDARD ALASKA PRODUCTION CO~'~PAN? MAGNETIC SINGLE SHOT SURVEY RAI,)tUS OF' CURVATURE METHOD OF CO~iPUTA'~ ENGtNEEER TERRY HENDERSON COMPUTED FOR CDC E~¥' OCEAN'!'ECH<F~'~ L.!N~JSE?' JO8 HO A .... 0686--006 WELL C. ...... i9 t<B ELEV 67., SURVEY DATE PREPOSEO DiR S69--.23k~ P.£CORO P TRUE HEAS, DRIFT YERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA {)ZREC D M [:, E G, 554:3 8t 588 't 69 6036 7i 6446 57 74~8 i 4 7'621 47 7966 06 8Z97,69 8~57,54 84 06,39 :547S 58t4 5969 6739 ? 055 737i 7554 7'8'99 8230 8290 8,339 ,75 ,65 ,5 i 4.~ O0 6;.;.: 4,8 741 5 44 36 8482 4.5 24 8925 43 42 9~5Z~ 4t ~8 9595 40 ~ 2 10040 38 l 8 I 0462 38 6 1 05~8 38 0 'I 0600 38 O 'TC~TAL COORDiFI~,I~ ..... S72,27&f i 2gi , 2r8 S :ii; ?' ''~ ":~ 0 i,j ~ '''~'~ ~' S7.3, OOi,O i 379, 09 S $74,40~.8 i 480,63 S S7,4,70W !58J,34 S f'"- 7 ' ' $73;,70i4 ~74.7, iO$ :S74, 00i¢ i79i , O4 S S'75, ~ Ob~ i866. 04 S SFaS i Oki J"~'?O o4, S E;7'6,50~.d 1942, 03 S 376,50W ~950,94 S 2791 90 3262 3 ! 4540, G~'~' 4700,60 497 i, 96 5270,24 53 07,35 P 0" OI ]ANC:E 354 i ;3929 42.75 4.., o4 4872 50~0 531 0 5~7._. 0 565,4 A N g; L, ~ 0 0 G L. E G S E \,' E R ! T Y C~i.>TA?" " .... :30'2' 4 -' ~ :33 7 "i , 25 35 ":' '~' 39i7. . ., =~;._ i 4265, ...,'"' ,:. ''~ =~ (.t 2':' 2 '~ "' 5.304. 0'7 ....... 5564,6 0 56 i :i , :S 2 =': ¢. 49 "' q BOTTO~J HOLE CLOoURE 565¢. ,. 5,." t-.=E.: F~'I' .::, ...... ,d."-~ I W SOHIO I~JEI,..L C;-- 19 t4t~a.~URED DEPTH ANC, OTHER DATe: TRUE I'!EASURED VERTICAL. SUB DEPTH DEPTH SEA 6744. 5567 688? 71 74 5,9,67 8 t 46 8285 6667, 8425 6767, 8708 6967 8986 7~67, 9t 23 7267, 9 S 9 i 7467, 9524 7567, ..,; ..... 7667 9784 776 7 O 04 i 7967 oi67 042~ 8267 055 0 ~'~ 06 O0 8406 ~,,'E~,~ ~00 FEET OF SUB SEA. DEP'Fi4 D I FFEP. E~,~CE CORRECTION -r,-., ? ~:, ~ COOR9 ! i'.!AT ir:o' C 0 t't P Li T E R ..... 24 j U i'..! 86 i,::; F: iS L. E',./ 67, ~ 6 i:". T, 5500 i '177 i t 77 56 00 ._ c 08 i 6000 i' 398 4i 61 0 O I 4 38 40 6300 t 505 ~7 64. O O 'i 54, I ,:~ 6 6508 6 8 O O 6900 '" 4 i 4 i 7 O 00 i ? 9 0 :39 71 0 O t :3 ! 9 S 9 72 O O ! S55 36 r' .:, 0 Oi,:.° ,::,.... 0 ,3 b ¢' ~ 00 7 5 0 0 i 9 5 6 3 '2 7600 ! 9 S 7 S i F 70 O 2 01 7 30 ¢ ,=, 0 0 2 7 9 0 O 8 O n 0 .... 1 i 27 81 0 n. ':'~ ~. '-'~ 9 27 92 00 2156 :28 ,00 S i 269,,.*' i2.99,~ i415 78 S I442 74 i 4 9,S 71 S i 544 49 S · :,,' O72 1 597 43 S i 624 '2~ - 1551 0.4 S 5 ," ," 0 S 1703 95 S i754 20 S i 778 ~' '" i SOl 56 S t 824 O0 S ! 845,55 S l $66,24 S I886,32 S i 905,96 S ~ 925, i 4 S !943,77 S i 9 5 0,9 4 S 2804,59 b.~ 3 i 95,99 329 0,97 :73566 ,~o 37 4 5 , 4 ~ 4030,80 ~.~ 422 0, i 3 4:3i i ,99 440i, .:,~'"',~. 448>3,3S 4656, i 6 ,48'i 7 :?:2 ~.~i 4895 7S ~.l 4972 72 hj 5049 02 5'i25 '24 5307,:35 h~ SOHIO ~t~ELL L~ .... '~9 I NTERPOLf4TED V¢~LUES FOR EVEH TRUE MEASURED VERT I CRL, DEPTH DEPTN 7000 5'746, 8000 64,6 'l, ':)00 O 7'~77~ 'J OOO0 793'5, SHOT SURVEY ,]08 NO A.-O6P36 .... 006 t000 FEET OF HE,¢~SURED DEPTH, · SEA TOT ~qL, C:OORD I NC:IT ES 7868, ~7~59,64 S 4947,96 b) 9339, '~'950,94 S 5307,35 8 :C'OHPiJ TER..- 24 ; , _1.2_1 I · Standard Alaska Production Compare, 900 Ecs1 Benson Bou, J P.O. Bo~ 196612 Anchoroge. Aloska 99519-6612 {907) 564-51 I 1 INDEXED DALLAS ARco STANDARD CHEVRON ALASKA PRODUCTION EXXON Date: 07/03/86 TEXACO lO: l~: 77154 MARATHON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: TELECO MAGNETIC DIRECTIONAL SURVEY (S) The followlng material Is being submitted herewith. Please acknowledge recelpt by slgning a copy of this letter and returning It to this offlce.' G-19 Teleco Survey Job ¥/506 06/18/86 Rece I ved '"~-- . Date ~..j AlaXska O~l & Gas Cons. (;ommissk A ...... ,, ..... ,) .... , s ...... ~ ..... c~,(o,,,' ...... ' "" uZ~rlch°ra'"o Victoria Aldridge LR2-1 INFORMATION CONTROL Wel I Records LR2-1 Standard Alaska Production 900 East Benson P.O. Box 196612 Anchorage, Alaska 99,519-6612 (907) 564-51 I 1 ARCO EXXON STANDARD ALASKA PRODUCTION Date: 06/23/86 PHILLIPS T~: 77136 STATE OF AK PDBY Systems (Transmittal Only) SAPC MAGNETIC LIS TAPES & LISTINGS The following material is being sutm~tted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: G-19 OH FINAL mag tape GOf/347249 06/20/86 Tape Pos. (/04099 800 BPI * EXXON: An Asterisk (*) next to a listing above means you should have received the T~pe(s)~nd Listing(s) direc~tly from the respective service company. ~ · Date k / Alaska ut, ~ ~$~'I~:'. INFORMATION ~L a,,,-.~...~,,~ ' Well Records IR2-1 ,.'.. Standard Alasl~a Produclion Compare 900 Fos! Benson Boul,. J P.O. Box 196612 Anchorage. Alosko 99519-6612 (907) 564-5111 ARCO EXXON S'rANDAR~ ALASKA PRODUCTION Date: 06/23/86 PHILLIPS IO: T~: 77136 STATE OF AK PDBY Systems (Transmittal Only) SAPC MAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: G-19 OH FINAL mag tape GO~/347249 06/20/86 Tape Pos. ¥/04099 800 BPI * EXXON: An Asterisk (*) next to a listing above means you should have received the T~pe (s) .and Listing(s) directly from the respective service company, eas. ~q~D~'~~k~il~' F% /x~/ ( '~ / ' '"---/ , ~V~ctoria Aldridge LR2-1 Date ~ / Alaska u ............ ,is,si, INFORMATION OO~iRi)L ~~ .~.:~;i?u~ Well Records LR2-1 MEMORANFUM TO: TH RU: FROM: State of Alaska ALASKA OIL f~D GAS CONSERVATION C. V. Cha " :" ''/ DATE: June 10, 1986 FILE NO.: D. JFB. 3 Lonnie C Smith~'-~× ' · / "' 6 TE LEPHON E NO. Commis s ioner SUBJECT: BOP Test Standard PBU G-19 Boytec~g~ Permit No. 86-100 John F. Petroleum Engineer Asst. Prudhoe Oil Pool Sunday, June. 8, 1986: I traveled this date from KRU's 1Y and IF drill sites, via Twin Otter, to the ARCO Prudhoe Bay base camp. From there I drove to Standard Alaska Production Company's G pad to witness a BOP test on PBU G-19. Due to problems with the lower pipe ram, the BOP test began at 11:50 a.m. on Monday, June 9, and finished at 2:00 p.m. There were no failures. I filled out an AOGCC report which is attached. In summary, I witnessed the BOP test on Standard's PBU G-19, Nabors Rig 18E. ,02-001A(Rev 1(~84) . _ 5/84 STATE OF ALASKA ALASKA 0IL & GAS CONSERVATION COMMISSION BoO.P.E. Inspection Report ~ Date Inspector .~ /~ ~ Zf~) ~ ~- ~ Well Operator. 5.y~q Z~mg ~./~-~ .~od~,~i,~XC~. Representative Well ~~ ~-- /~, Permit. ~ Location: Sec /~ T.//A/R /3~M 6~,z~J, /~Casing Set @ Drilling Contractor/~ 7~~- Ri8 fl/.oz~ Representative Location, General O{ Well SignO~ ACCUMULATOR SYSTEM General Housekeeping (~ Rig © ~ Full Charge Pressure ~ Reserve Pit ¢3 '~'- Pressure After Closure ,/ Mud Systems Visual Audio Pump incr. clos. pres, 200 psig Trip Tank ~' Full Charge Pressure Attained: Pit Gauge ~ N2c~/0q ~.~©~ ~7~ "~.'~ Flow Monitor ~ Controls: Master ~.. Oas Detectors ~ ~ Remote BOPE Stack ,~ Test Pressure Upper Kelly Preventer i'-~ '~'q ~. ~":, Lower Kelly .x.~A~, nular Pipe Rams ~ 2 "'II -~',~O © Ball Type Blind Rams-'"~ 0_ ~, !1 % ~O ~ ._ ~. Inside BOP ChOke Line Valves II ~ OO ~ · c-. ' ..,.H. R. Valve.._,'", ~ Kill I]ine Valves fP ~. ~'~_.~'~ Check Valve Az f~ Test Results: Failures ~ Test Time ~ hrs C.. ' 5~p e Repair or Replacement of failedequ nt to be made within ft. psig. psig ~ rain YP sec. ~-~ rain /~sec. psig. Blinds switch cover · Kelly and Floor Safety Valves ~ ~ Test Pressure ~ ~ Test Pressure ~ ( Test Pressure ~ ~ Test Pressure Choke Man~fold ~ Test Pressure No. V Zve No flanges Y ~ ~ / ~ ' Adjustable Chokes Hvdrauica!l¥ operated choke ..~ ~?~r~, ? o/ · days and Inspector/ Commission office notified. Remarks: Distribution orig. - A0&GCC cc - Operator cc - Supervisor Inspector May 16, 1986 Mr. R. S. Allan District Drilling Engineer Standard Alaska Production Company P.O. Box 196612 Anchorage, Alaska 99519-6612 Teiecopy: (907) 276-7542 Re: Prudhoe Bay Unit G-19 Standard Alaska Production Company Permit No. 86-100 Sur. Loc. 3744'SNL, 3003'V~EL, Sec. 12, TiiN, R13E, ~.~. Btmhole Loc. 678'SNL, 3607'WEL, Sec. 14, TllN, R13E, U£q. Dear Mr. Allan: Enclosed is the approved application for permit to drill the above referenced well. The pe_rmit to drill does not indemnify you from the probable need. to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. !~,rhere a diverter system is required,· please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. BY ORDER OF THE COmmISSION jo Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery STATE OF ALASKA ALASKA IL AND GAS CONSERVATION C~ /1MISSION PERMIT TO DRILL 20 AAC 25.005 I la. Type of work Drill ~ Redrill []1 lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil Re-Entry I~ Deepen []1 Service iq Developement Gas [] Single Zone ¢¢ Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Standard Alaska Production Company KB : 72 feet Prudhoe Bay Field 3. Address 6. Property Designation P.O. Box 196612, Anchorage, AK 99519-6612 ADL 28285 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 3744A't SNL, 3003' WEL, Sec. 12 TllN, R13E UF PY'urlho¢ Ray IJnif Blanket top of productive interval ' ' 8. Well-~'u~b~r - Number 600' S~&, 3400' WEL, Sec. 14, TllN, R13E, UM G-19 (21-14-11-13) KOO683449-G-14 At total depth 9. Approximate spud date Amount 678' SNL, 3607' WEL, Sec. 14, TllN, R13E, UM May 18, 1986 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line ADL 28280 678feet G-18 110' feet 2560 l1679'MP;9142'TV¢eSt 16. To be completed for deviated wells 44o 29° 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 1 800' feet Maximum hole angle 0 Maximum surface 3330 ps~g At total depth (TVD) 4390 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include Stage data) 26" 20" Conductor 80' Surface llO IlO' 8 cu. yds. Concret 17-1/2" 13-3/8" 72# L-80 Butt 2676' Surfac 2706 2682' 3759 cu. ft. Permafro 12-1/H" 9-5/8" 47# L-80 NSCC 5085' Surfac~ 5.115 4502' 575 cu. ft. Class G 12-1/4" 9-5/8" 4/¢~ L-SU Butt 54/0' 5115' 4502 10505 8405' 8-i/2=='7:: 2b¢~ L-80 ld4S 1285' 1U334' 872b llbl~3 St147.~ 34/ cu.ft. GlassG +5 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~ 7 ? ~ ? Surface ; 1: Intermediate /.i//l!'~? .-/ i¢..,,,,_' Production ~¢ .... Liner .-. Perforation depth: measured /",: ,.¢, '"'"'::~ ("°"';;dc ..... ...... 'i; -2.':] ...... "'- true vertical 20. Attachments Filing fee ~ Property plat L~ BOP Sketch E~X DiverterSketch~ Drilling program r~ Drilling fluid program .~ Timevs depth plot [] Refraction analysis F~ Seabed report [] 20 AAC 25.050 requirements [] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Signed ~. ~. ~ Title Division Drilling Engineer Date Commission Use Only [ APl number I Approvi~ls_d/atle6 I See cover letter Permit Numbero ~- ! OO~? 50--O'%~-~[ _%'~ ~ /86 for other requirements Conditions of approval Samples 'required [] Yes .~No Mud Icg required ~ Yes ,'~No Hydrogen sulfide measures_ [] ~ [] No.,Directional survey required [~ Yes [] No Required worki~u~OP.~j~2~,~ 3M; ',~ 5M; [] 10M; [] 15M Other: / . ~....~./" /*/~/<, /" // 3668D / /'/"/// , _ by order of Approved by Commissioner the commission Date st ~oKCl Form 10-401 Rev. 12-1-85 Sd/ n triplicate PROPOSED DRILLING AND COMPLETION PROGRAM WELL G-19 [21-14-11-13] PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 17-1/2" hole, a 9.0-9.7 ppg water base mud in the 12-1/4" hole and a 9.0 ppg water base mud in the 8-1/2" hole. Drill 17 1/2" hole to 2726' and cement 13 3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original resevoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9 5/8" 47~ L-80 mixed string of Buttress and NSCC to within 5' of 12 1/4" TD and cement in two stages: First stage using Class G cement around the 9 5/8" shoe. The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus followed by nonfreezing fluid. Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250' inside 9 5/8" casing shoe and cement using Class G cement with 5% KCL. Clean out to 7" float equipment. Change over to 9.6 ppg. NaC1 completion fluid. Test casing and lap to 3000 psi. Run 9 5/8" production packer on internal plastic coated tubing with a sliding sleeve. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Suspend well for perforating subsequent to rig release. Tubing Size: 4 1/2" 12.69 L-80, A/B Mod, BUTT, IPC Tailpipe Size: 4 1/2", 12.6~, L-80, BUTT '\ ~.'~ / '.":/ DAW: 12-MAY-86 20" Conductor Ball Valve 13 3/8" Casing Shoe 17 1/2" Open Hole PROPOSED DOWNHOLE DIAGRAM _ WELL G-19 [21-14-11-13] PBU PROPOSED DEPTH BKB 110 2073 2706 2726 4 1/2", 12.6#, L-80, A/B Mod, BUTT, IPC 9 5/8" Packer 7" Tieback Assembly 10285 10334 9 5/8" Casing Shoe 12 1/4" Hole 7" PBTD 7" Liner Shoe 8 1/2" Open Hole 10585f'~ 10590 11579 11619 11619 DAW:13-MAY-86 STACK CONFIG~ ~RATION 5/8" TRIPLE RAM STACK .5000 PSI WP DRILLING ANNULAR PREVENTER -- "J PiPE RAMS ! ! I I BLIND RAMS CHECK KILL UNE HAND GATE GATE DRILLING SPOOL CHOKE LINE HAND GATE HYDR. ASST. GATE PIPE RAMS 30 40 03 04 (Proposed) (Proposed/~ /G-/! ('Proposed) O~ t4 O3 04 ~o ;,o :~o ,,,om-- or_;. ~o ! 2O 30 825' (Proposed) ~ ]: G- 13 ] ~ i~J? ] (Proposed) ~- - I I~: ! LAT. 70° i9' 17.90" ~1 ~ ~o.o.,~o ~' ,~.,~" ~ X = 657,864 . ~- 18 ] ~ - 17 {~ro~o**~J~l~., f Propo~J CERTIFICATE OF SURVEYOR I hereby certify that lam properly registered to practice land surveying in the State of Alaska and that this plat represents a location survey of the weilpad shown and the well thereon. This survey was made by me or under my supervision and all dimensions and other details are correct. Bottom hole locations are furnished by others. Date Surveyor 4O PAD DETAIL SCALE; 1"=500' Added Proposed BHL G-19 Added Proposed BHL G-14,15,16117,8~ 18. Added South Extension to Pod DetaIl. Added Proposed BHL G-12E~ 13. Added Proposed BHL G-9t~ II; Revised Proposed BHL G-lOIRevised Surface Loc. G-8. Added Proposed BHL G-lO C--- 5/~3/86 PJR 6/17/81 PJR 6/~7/8~ PJR 5/15/81 PJR 4/:3/81 PJR 1/5/81 PAD "G" EXTENSION Located in E I/2. PROTRACTED SEC !Z,T. II N.,R.I;SE.,UMIAT ME. RIDIAN~ALASK~ Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by F.M. LINDSEY 81 ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4-081 j Anchorage Alaska , i I * I _$PSDUA88: [DRANO13]O19_CLOSAP_SHORT7. LIS; 12-MAY-1986 13:33 --- Closest Approach Analysis --- Date: 12-MAY-86 Time: 13131:41 Seaech Radius= 3333 7 DECREE LEAD LINE Fo~ p~oposed well: ~-19 [21-14-11-13] Location = W-E S-N TVD(SSS) Top 657248.00 5967884.00 -72.00 Bottom 651748.12 5964863.55 9057.54 Note: All depths in Feet Belo~ Kelly Bushing (BKB) Pa~ 1 Closest Approach WELL IDENT /PROPOSED\ /NEAR~Y\ TVD DEPART TVD DEPART AO.~9-.-~OOSbO0 D-4 71P3. I 4304. 6 7702. 9 3787. 4 A029-?005700 D-3 91-~9. 5 6P74. 7 ~177. 3 4627. 6 A0~9-~008400 F--'~ 8410. 3 5568. 5 9306. 8 4062. ~; A029--'~008500 F-3 4760. 4 1984. 7 72~5. · 4076. 7 A029-20 ! 0400 H-4 91~9. 5 6274. 7 9221. 7 6110. ~; AO-'~9-~O 13500 F-8 8497. 3 5653. 9 8252. 9 4699. 8 AO.~¢~-~O 1 b-qO0 D-7 8P64. 0 54~4. 8 8417. 3 6107. 3 A029-2021400 ~-1 1710. I O. 0 1700. 0 3. 7 A02~-~021700 ¢-2 1802. 0 O. 0 1806. 9 8. 0 A029-20221 O0 ¢-3 1802. 0 O. 0 1796. 5 ~. 0 A029-2022500 (~-4 1802. 0 O. 0 1800. 0 7. I AO29-2034bO0 G--~ 9129. 5 6274. 7 9239. 4 5909. 8 A029-20351 O0 g-5 1802. 0 O. 0 1802. 8 13. 4 A029-2035200 G--7 9129. 5 6274. 7 9144. 5 7067. 1 A02~-2035800 ~-b 1802. 0 O. 0 1809. 7 13. 4 A029-2035c?00 (~-7 1802. 0 O. 0 1800. 5 26. 8 A027-2046100 D-15 8431. 2 558=;. 0 ~1¢~1. 0 4470. 5 A02~-2055300 ~-10 . 6.4 0.0 0.0 0.0 A02~-20581 O0 g-B 1802. 0 O. 0 1796. 6 7. 2 CLOSEST DISTANCE 4226.2 1742.6 4786.7 5664 7 3724 0 6221 3 747.9 1967.5 1878.1 17~5.4 1717.3 3978, 7 2164 4 1129.3 1487 9 1397 4 3279 0 1349 6 1153.~ Vertical Intersection /PROPOSED\ /NEAR~Y\ TVD DEPART TVD DEFART VERY'ICA._ DISrANc£ AO29-~OD8300 Q-Il 3195.6 472.4 3616.4 A029-~059700 Q-I~ 106.3 0.0 100.0 A029-2060000 Q-13 1802.0 0.0 1807.5 _$~$DUA88:[DRANOi3]~lg_CLOSAP_SHORT7. LIS~l 13.3 1098.3 0.4 17.9 1245.6 1098,8 1546.6 1632.2 A029-2061900 Q-17 1494.5 0.0 1500,0 5.9 214.2 AOag-2062000 Q-18 0.0 0,0 5,5 0,0 110.0 A029-~064300 Q-16 1694.8 0.0 1699,9 6,4 324. 1 AOag-2064600 Q-14 1802.0 0.0 1808,0 14.9 536.6 Aoag-a064700 Q-15 1802.0 0.0 1806,0 7. i 433.0 A029-2098600 U-18 8922.6 6071.5 9247,6 8287.4 3430.0 A029-2152200 D-25 7615.2 4787.8 8360.5 4662.0 2613.0 SUMMARY The well which comes closest to the p~oposed well is: AOag-ao6aooo Q-18 110.0 ~eet 1802.0 ~eet Closest approach distance = ½ICK OFF ~o~ this ~un = 12-MAY-1986 13:33 _$25DUA88:[DRANOI3]~l~_CLOSAP_SHORT. LIS; 1 12-MAY-1~86 13:30 --- Closest Approach Analusis --- Date: 12-MAY-86 Time: 13:2c~:33 Search Radius= 3333 COURSE LINE For proposed well: G-I~ [21-14-11-13] Location = W-E S-N TVD(SBS) Top 657248.00 5~67884.00 -72.00 Bottom 651420.~2 5~65556. 57 ~057. 54 Note: Ali depths in ~eet Below Kelly Bushing (B~B) Page 1 Closest Approach WELL IDENT /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART CLOSEST DISTANCE A02~-2005600 D-4 6859. 1 4045.4 7745.8 3828.8 4721.8 A029-2005700 D-3 9129.5 6274.7 9177.3 4627.6 2466.6 A029-2008400 F-2 8673.~ 5827.3 9306.8 4062.9 4112.0 A02~-2008500 F-3 5025. I 2244.6 7250. 1 4062.8 5460.0 A029-2010400 H-4 ~12~.5 6274.7 9221.7 6110.9 3966.8 A029-~013500 F-8 ~129.5 6274.7 8948.1 5312.7 5467.3 A029-~016~00 D-7 81~5.6 5357.7 8553.3 6218.6 1368.2 A029-2021400 ~-1 1710.1 0.0 1700.0 3,7 1967.5 A0~9-20~1700 C-2 1802.0 0.0 1806.9 8.0 1878.1 A02~-2022100 ~-3 1802.0 O. 0 1796.5 9.0 1795.4 A02~-2022500 ~-4 1802.0 0.0 1800.0 7.1 1717.3 A02~-2©34600 Q-6 9129.5 6274.7 9239.4 5909.8 3277.6 A029-2035100 ~-5 1802.0 0.0 1802.8 13.4 2164.4 A029-2035200 9-7 9129.5 6274.7 8979.1 6877.3 1457.0 A029-2035800 Q-6 1802.0 0.0 1809.7 13.4 1487.9 A02~-2035900 ~-7 1802.0 0.0 1800~ 5 26.8 1397. 4 A02~-2046100 D-ID 8224,4 5385.9 ~191.0 4470.5 390~.8 A029-2055300 Q-IO 6.4 0.0 0.0 0.0 1349.~ A0~9-~058100 ~--8 1802.0 0.0 17~6.6 7.2 li53.6 Vertical Intersection /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART VERI'ICA:_ DiSFANC{ A029-2058300 G-il 3407.7 656,5 3813.8 A029-2059700 G-12 106.3 0.0 100.0 A029-2060000 ~-13 1802.0 0.0 1807.5 _$25DUA88:[DRANO13]G19_CLOSAP_SHORT. LIS~l A029-2061900 G-17 1494.5 0.0 1500.0 A029-2062000 ~-18 ~?~,~' o. o o. o o. o A029-2064300 ~'-16 1694.8 0.0 1699.9 A029-2064600 ~-~4 18o2. o o.o 18o8. o A02~-8064700 ¢-15 1802.0 0.0 1806.0 d-18 9108.3 625J.~ 9247.6 D-25 7494.8 4669.6 8488.0 13,3 1288. 4 0.4 17.9 5.9 0.0 6.4 14, c~ 7. 1 8287. 4 4741. 1 SUMMARY The ~ell which comes closest to the p~oposed ~ell is: A029-2062000 Q-18 Closest approach distance = KICK OFF ~or this run = 110.0 ~eet 1802.0 ~eet I~45. 6 1043. 3 1546, 6 1632. ~ ': 1 10. 0 324. 1 536. 6 433. 0 ~680. 5 3135. 7 12-MAY-1986 13:30 5125.6 2343.3 7231.2 2478.2 2100,6 5~56.0 3158.7 9124.2 3288.8 3i6:3. I 10 3/4" H~ulic closes. 10" DIVERTER DRILLING RISER DIVERTER SYSTEM DETAIL DRILL. DEPT. April 1982 20" 2000 PSI WP ANNULAR PREVE~OR DRILLING SPOOL 20" CONDUCTOR PIPE NOTE: DIVERTER ~INE HAS TWO DIRECTION DISCHARGE CAPABILITY AFTER LEAVING RIG SUB-BASES. SURFACE HOLE DIVERTER SYSTEM Two lines venting 90° apart in directions that insure safe down wind venting, and extending to a point at least 100' (feet) from any potential source of ignition. 10 3/4" manual l~Jtterfly valves ~10 3/4" 55~ Buttress 10-3/4" Hydraulic operated Butterfly valve 20" Diver ret Spool w/10 3/4" Side Ozt]et. NOTES 1. Ail pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10-3/4" butterfly valves, mechanically connected to insure that one valve is fail- safe open at all times. 3. All turns are 90° (degrees) and targeted. T'A ~I ~C AAJO K/ll Choke Manifold Poor Boy Degasser · Brand t Vacuum. Type Degasser Brand t Dual Tandem Shale Shaker Pioneer Mud Cleaners Pioneer ~KI Centrifuge Ir~'v~ t TRIP TA~IK / / ," MUD DISTRli~:/JTION OIT'CJ/,I. -/ MUD cLEA~UER r'AxJK CP/VE D~c#~ ~ .. V'~C uUZl T Y I:~ HUO C/,F_AN£[~ ~ -- PIO~JFE,~ ~ 1 - Recording drilling fluid, pit'level indicator with both visual and audio warning devices at driller's console 1 - Trip Tank (75 BBL.) . 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp AgitatOrs ITEM APPROVE DATE - (~ thru 8) (~ thru 1~) ~ ~ (10 and F3) I (4) Casg ~.~/. ~- H, (14 thru 22) (23 thru 28) (6) OTHER /~, Ao (29 thru 31) (6) Add: Geology: Eng~rDering: LCS WVAjAL y~.~-~ MTM __/~Cf'~ HJH .~z~: T.,Z/ rev: 04/03/86 1. Is the permit fee attached ......................................... · 2. Is well to be located in a defined pool ...................... 3. Is well located proper distance from property line ........... i~~i.i--i!''' 4. Is well' located proper distance from other wells ............. , . 5. Is sufficient undedicated acreage available in this pool ..... 6. Is well to be deviated and is wellbore plat included ......... , ,. 7. Is operator the only affected party .......................... 8. Can permit be approved before ten-day wait .......................... REMARKS ® 10. 11. 12. 13. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... 14. 15. 16. 17. 18. 19. 20. 21. 22. Is conductor string provided ........................................ Will surface casing protect fresh water zones ....................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ 23. 24. 25. 26. 27. 28. Is a diverter system required ....................................... Is the drilling fluid program, schematic and list of equipment adequate~ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to C5'~O psig .. Does the choke manifold comply w/API RP~53 (Feb.78) .................. · Is the presence of H2S gas probable ................................. For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? ................. 30. Are seismic analysis data presented on shallow gas zones ............ 31. If an offshore loc., are survey results of seabed conditions presented O ~ O 32. Additional requirements ............................................. POOL 6¥0 (~-~ INITIAL GEO. UNIT ON/OFF CLASS STATUS AREA NO. SHORE Additional Remarks: 7~ ~3~//A~ ~mv bm' ~t;f'~:,,q Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ti 1~ I T T Y P E C, A, T E 81 Z E C 0 t'.) 0 0 0 0 0 0 ti :j 0 U b 5 0 O 0 0 0 0 0 ! 2 0 t) 5 0 0 0 0 0 0 0 1 2 0 6 5 0 0 0 0 0 0 0 0 6 I,) t:,, 5 dOP. t,.; !l ::v ~ F": ~,~ AT .ACC; 72,'!31 I., F) P ," ,5, S q' [:,: V [<.;",~ 5 ~IT SIZE = CA$I~G = 9,625" $!JkFACE 'J[~ t,~ CA~ING TYPE F[ ~.!lP.. ...., = C['TtJt.)F: ..... (")Ih. 10595, () ' !. 1. 60(), O' 1029 J,, O' bVP u10,~02 ~k:t<I~',i. CA'YtO~,' [.I8'.F!F;G PAGE DE]PT GR PS1 NPHI PSI I~RAT r-Si R,~R A PSi ~ C ~,~ [, PS1 CPS FCI~I, FS1 CPS GR PS2 GAP ~ P H I P S 2 P U ~RAT PS2 N C N I~ D S 2 C F C i~,~ .L P 8 2 C P N p H I P 8 3 P R~RA, PS3 ~CIx~ 1, PS3 CPS F C ~'~ I,,,, P 83 C P NPHI PS4 PU R m R A. P S ,t l~ C i~ l, P 54 C F'CNL PS4 A V E 0 C ~'~ L, 6~ APl AP1 AP1 Flbg YPE CI.ASS ~,![]L> t.,~) 0 0 () 0 0 310 0 1 (.: O 890 O0 0 0 42(, 0! 0 0 000 00 0 O 330 3 ! (> (') 33 (', 3 () 0 0 310 (~ 1 0 890 Oo g 0 4. 20 () 1, 0 0 (', O 00 (.~ U 330 31 (; 3 30 3 (; () 0 3 1 t) 0 1 0 0 a g 0 O {) C 4~0 01 0 0 000 0 0 O 0 330 31 0 O 330 30 0 0 310 01 0 0 890 00 {) 0 420 01 0 0 ()00 O0 () 0 33 0 31 0 0 330 3 0 0 0 000 00 0 PROCES6 (OCTAL) 6~ O0000UO0000000 6H O00OOOGOOUOUO0 68 OOoOOl)i.~OOOO000 ** DATA ** DEPT 11555,5000 (;R R N R A 4 49 ~ I N C t'~ ,L,~ b p H I 3 0 ' 07 8 1 i',~ R A P"'C N L 999 2500 GR ~ , i~PHI 30 1,758 b~ RAT' F C :~ L - 999: 2500 A V E 0 4 438 -99 4 -99 -99 3 O 8 :~22 3 51, 0 3 21~7 (,, 000 2500 3438 25OO 2500 2 7 9 P 7 5'50 0 4,4t.~88 0 (:) 0 0 $ 672 247 :'l. 4,t. 875 0, 4:{>!33 (.' ' 3 43 8 F C ~.: L 27,9785 ~:~ R A T 975,5000 GR -999,.2500 NCNb 29,3945 f.~RAT -[499' 2500 GR -,999.2500 l'~ C i\, l., 1,249.0(:00 GR 2 z]~. 7 C: 70 .!': R A T ~,7969 31,7969 '~99 2500 99' - .250C, 4,18'75 311,8,0000 40,2~13 3188,0000 3U.5313 ~:PHI 25,7J24 nPA'f R N R A 4., b 6 a 1, ~: C t'~ b NP~I 27,2949 .NRAT F 'CNb 1 l. 33. 0000 GA R ~:'~ R A 4,312 5 ~',i C N .b F" C i"~ I~., 1141,0000 AVE() D E: P T 1 l ,'J 00,000 ti g R R ;'gR A 2. 9922 NCNb ~..~ P H ~ l, 5,4297 ~'~ R A 'f ~'CN'L 2536.000O GR R N R a 2.9922 N" C N L N.PFi I 1{,N41.4 ~'~R AT ~'C '~ L 2 5 0 0,0 0 0 0 A 'V' g 0 0 g: P T 1:9 ? 00 . 9000 (; R 00 i)0 5117 2503 '1 b. ~953 49.96, ,:,. 77 73 0.293[i 2'1, r,5594 :~ ? 08. (.) 0 0 n 4.953l 33.2187 4,752. 0000 4.8516 0.2871 12,8437 51 O0. OoO0 4,7109 1 .~, 0625 4920,000(; 'I. 7773 0.2729 19 3594 7424, (.) 000 3,I34~ 19. ti 25 0 7320. 0000 3, (,)703 O, 1528 4219 :1, 9, 568 ~. l'...~ (,10 0 3, :'>4 22, 844. 5 '19 6 00 0 0 3~78!3 O. 1968 59 t~ 43 7 i{ P H I FCNL ?,; P d I N P i't I ?'C N L t",i P H I F C *~ L R NRA ~: P H I F C N :b F C N L RN'RA NPH I F C N L N P H I F¢ N L t,i p H I FCN L N' P H I i 222,0(.:00 G~ ~. 21 U9 ?','Chh 26.8086 990.50()0 GR q.5313 28.5156 NRAT ~01~..0000 4,3555 hCNh 27,2949 1093,0000 G.R 4,3 75 o ['~ C I,~ h 25,4883 bRAT 114(),00()0 I5. 2832 biRAT 2480. 0000 Ge 2,9648 N C N L 15,3320 NRAT 2446,0(,~00 L;R. 2,94.14 NCNL 22, !6BO NRAT 1417,000(} 3. 8340 NCNL 21,. 4.844 NRAf 1472.0000 L,R 40, I. 855 hiRA, T 656, (,.:000 GR 30. 7650 b, OOUO 1.5, B984 a92'~, 0000 b, 15t, 2 1 ~. 2()31 .~47~s4,0000 4.82~,0000 ~.8633 41.1502 4'116.0000 ~,'1109 4960,00()0 i, 0.~250 5144.0000 3,~191 19.7813 7620'0000 3,1230 19,1875 7350,0000 3,7070 22,3281 5760.0000 3,7227 26,5781. 5832,0000 4:, 0469 5 606,000 0 3,9531 39,0000 6272,0000 0,2148 6'7,0625 5.7891, 39,4551 t~ ~, .5 () 0 U 8,4646 ~,1.5625 0.4019 ~ C~b DEPT 1054~,£1000 lq 2,1P A -909,2500 i~CNL t"C ~a h 399, O 000 G F' FC~,~L 370,2500 AVE(.} 4.3.1875 -999. 2500 7,1992 46. 4063 '999,2500 7.30~6 0.4.937 .FCN b R ?,', .R A ** FILE TRAILF;R ** f'IbE ~.~i A a E :EDIT ,001 SERVICE NA~qE : DATE : FILE '.P~PE : ~E:XT FILE; aA~tE : S g R V I C E: t',¢ A'~,,i g : VER$'I. Oa ~ : DATE : FILE TYPE PRFJV I [~US Fl, bE : 1024 5.2 t 8 '? .,,i C t, [., 40.1655 'b 59.0000 (.-.' R 5,5234 55.3223 354.'1500 (;R 7.1. 406 56.2988 ¢.iRAT 329,5009 54,3945 t~ ~ A.'I~' -999.2500 6. 6055 54,5898 ,,.999,25U0 GR 7.0000 ~.,' C N L 3 ~ 6 ~. O 000 o,2109 0.'*, 7813 3 gO~, 0000 '1,9375 62,8437 2652, ~,U469 6 '1, ~ 8 't 5 2532, '999,2500 ziO, 3 .~38 2 o 3 6,0 0 0 0 -999.2500 49,0938 259~, t) O00 L,~P OlO.it02 VENiF1CA'f!C~,! L1S'i.~ii~G PAGE 00 150 ~_~ C [)EPT CCL O, L', F, P T 11500.25 o 0 C C L 0,000 o DK, PT ! 1 qOo. 25ou CCh C C [. 0,0 000 hEP1' 1]200,2500 C C L 0, o 000 CCI., 0,00(30 DEPT 11000,2500 C C L () o 0 O 00 D E P'tf' I ()900.250 U C C L 0, t) 000 D g P',iL" l. 080 o. 25 t) 0 C C L 0,000 0 DE,PT 10700. 250o C C L 0,00 o 0 b IS P T 1060 {.). 2 ~ o 0 C C L C, ,, o O 00 DEPT C C b 0 , 0000 CC L.; 0.0 0 0 0 C C L CC [., 0.000 u C C b C C b O. 0 () U :) C {2 C C L CCI., 0. O 00 0 C C L ,.. (. h 0.0 0 ii 0 C C L CCL 0 , 0000 C C L CCh 0.0000 C C L CCh 0 ,, (.~ 00 (t C C b CCI.., 0,0000 C C L CC L O. 0000 C C (7 C L 0 . 0 0 0 0 C C L oo2 1, 024, 0. u 000 0. 0000 0,0 0 00 0.0 ;-) 00 0. 0.0 t) 00 0, 0.0000 0.00 00 0.0000 0, 0.00 00 1. b 8 0 0 t) 0 0 0 0 i,.., 0 U 0 0 0 t~ C C L 0,0 (} 0 {.) CCI..< u, o000 O. 0000 C C L, U, o 0 (.', 0 C C L 0,0000 C' ii:,b O, 000 0 C C L, (;. 0000 C C L 0, (,) 00 O' C C L, {;, 0000 C C b 0,0000 CCL {), OOuO DATE 1t~6/05/1~ OR.[GI Li : C(.t~vla":,'.,".l'5 :6TA.::'.~DARO &k, asKa, G-i~ (21-14-11-13) {AP1 ;150-02q::1-2!.559} ~t ~ o 7hr RECEIVED JUL 0 8 1986 Alaska Oil & Gas Cons. Commissic, Anchorage F'r-,-z',.; i c,,us r-ee ]. ', [:, a 't s:: :_-: 6 / U r:,,.- ...._,f3 r. i g i n: T .a p ,=' r-: .::~ m e: S 4 7 ;:2 4 '[.'~ C: 0 i'.i T E i-..i T S 'F A i'.i [:, fl R D A L A S !..':.' A P F.: CI [:, LI C: T ! 0 f-I C: 0 ................. g.-i 'B ,: :s., i - i ".~- i i - i :3 ::, 0,.-': H ................ P F.: U [:, H 0 E B A ",': D ATE n F' j r~ E',: 06 - 2 0 - :-:', E, ................. Fi F~ F.:"f' H SLOF'E .................................... R L R '.5 i<. I:.~ .................................... U '3 P, .................................... i iN ..................................................... i 3E ...................................................... 57, 0~,0 .................................................. ~ E., 0 G, 0 .................................................. ._, ,: , his ...................................................... KB ...................................................... K B ................... ................................... S 0 ....................................................... · .~"1. ,': .-' 7 E, i ! N 0 R"f H S L CI F' E .................................... N Ct R T i-'I S L 0 P E ........................................ H U F' P , .................................... C R 0 'i 'l 6 0 0 i I 5 9 7 'i05q.....Fi, rl.i'iO ........................................ , = : , , , .. . , i i 594, 000 ............................................... 'i., 000 ................ , ........................... , ......... 9. 000 .......... ............................. · i 7;2, ~"~ 00 ................................ · .................. i ? 2, 0 ',"J 0 .................................................. F ir;": E F L 0 bJ L .i. i'1E ..................................... N.~ ~ ! t ~ ~ z J : ~ ~ ~ ~ : ,~ : ~ ~ ,, : ,. : : : : ~ ; ~ ~ : : : ~ ~ : ~ : , ,: ; : : , : ~ ~ z ~ : ~ : : t 6 E, i'i E A :5' U F: E [:, , ........................................... .::;, ....... ,_"; ¢ i'l 7 i , 5; 00 ..................... .............................. hi F' R U N i' "F T "¢ P E ~' T f'! F T 0 '.'3 Ft .'3 0 7, 0 !'_'l 0 0 0 0 0 0 f.; 0 0 0 F' T 0 :':'; FT 0 F T 0 Fi R :i 2 H R 0 I) E G F' 0 i) E G F 0 i',i 1',i F' 0 H Fl t'.i DEGF 0 2 0 ,2: ) 2 :.:.'; ]: ;.Z E C 0 D E ..- ~- !'-r i5 ;', . ~ F", F-, .:S '::-: E, E: E, 5 ::3 E; E, 5 65 6 5 E, 5 E, 8 E,S 65 . .. 6 8 E, 5 E, 8 65 ~]i E ~t F.'. FI ~zl F.: T T O S C: H L. !J i'i E; E R ~71 E F: bIt--4 E H '.3 ~:' F~. V 1: C: f.i: U i-..I .t: T I',I N i!.' F! ::.:; E F: 9 .~: t'.:: E U f-~ :i: T E P T i4 F E E T [::, E F' T F 'i 17- I',1 P R L b t"i [']: iR C.'~ E O fa i"I H :( L [::, lq E E: (.'-~; E C H H H L H i',1 E R L .7 H E F?. T H E F;: (.~ E L ::: ,-.' ~:- [::, T i',I ti..-... F.: G E: U '3 ,.." F ;[ L. D C: T :'r" F' E [:, E S C R -'[ P ]" 19 N E; E F,: ',;,' ]; E:E :E;ER',' 1' r'.~: hi !-,i E ?,t i i.') 0 R f.::, E F.: 7i: f:~ F' I ~:::~ P ii: r:-~ F:' i f:: ?' iF t L. E UHi1' LL-iG T?F'E (2 [.. ;:::! 8 :--; H8i2'- ~ F- ~" E: ~ S i Z E L './L. ::-..; hl F: L. ,,=< C: D E P T T E .i',i S H ~..--_ P. G E S F' M E F.: G E 8 ~';.'. H E F.'. G E .i: i...D i'i E ~.' {.; E i LH hiERGE [) T H E R G E '-: ): L .r.) C 0 ii F' U "l" 347 '2 ,:.1. 9F T :5 ,:-i. 7 ;7' 49 L. 8 S S 47' ;E-: 49 ¢:~ F:' i :'.~:47;?.'4.'~ L--i~P Z :2:47249 0 H i'"! i"i :?; 47 ;-3,4. 9' 0 i4 l'i i"i 34724q OHHH 34. 7' 2 ,"i.. 9 U S ..-.': i-' S -'I- 7' 24 ,:-.4 M i'i i4 0 C; .i'l 0 i 0 l"i ~ ,4. 'i 0 'i 2 0 4 6 0 0 i 2 h 0 2 2 0 6 0 8 3 2 ,.,"" Ct .. iZI is, ~_zI ~;j. fz, ill l:t 4 0 i 6 8 4 0 i 6 8 4 !-I i :S 8 4 i), I 6 F: 4 0 'i 68 4. 0 'i 6 4 !ii 'i 6 8 ,4 0 i 6 ,4 ili i 6 Iii 0 8 0 ('~ 0 U U LI U U IJ U U U U U U !.I~..t l.li.!!_! l..l U U JJ t.J U lJ 1_il_ilJ J_l U Li LI i..I t_t i I 7,2 ;:2 0 i i 2 06,500 ..,i ~f, 6 '.::, ,:.4 ii i06,,500 6, 3 :.'.:'. 4 i '!'f 006,.500 2:8 '--' ,.'~ q i 0 S~ O 6,, ..,.~-'- 8 0 ii:'70.6 508 24 7' 17 T E: i,! S ,.'3,'., ,:'q.': 7 ;2 ::.;.; rj 0 0 4 i 6:08 4 5 ':::~ C', (' t '2 r.: c) 0 0 9 .:.'.:, 30 0 ['i ["i F: i-I 2.5, 'i 0 0 ;27, I O ,9 7::::, 5 O 0 .: L_ D .: L.H ! i 0 i 7 'l 6. i ! 3 5 2 i 3.5 4 0 7 4 0,4 i 5.4 2 0 0 i-I L-I '-' rt '::?. 6, 7-2 Ci (i i f: 0 9 0 O 7 6, ,:':; 0 0 :'; L-: L; t T F: i.d ?.-~ R ~:'i Ft E t< E', E P F' F-" [:, L H F' D H F FL. .... L. UL E:. i'..i 8 'f t'D [) L T L.. E:L. i T L,. A 6' E: H T HR T H T I'] .... :., H Y']: ~:..~ i:;?. R I,! F H f-: S T ii F '.3 E; i:;~: H. C Fi C: S T H C E; S C~ .-i 9 ,:: 2 'i- 'i q.- i i -'i :2; ::,i5 ,.." i--i P F;: ij D H 0 E B A :'/ D F'! T E i] F j Fj Lq: () E, ,--2 () - ',':; 6 i-i 0 F-]: T H S L Fj f:' E LI:.::; F! ................... · , .. .............. ! 2 i if..i i3E ............................................... , ?-, v-., 0 E, () E, ~F:, , 0 E,. 0 ................................................... S'7 , 8 E, 0 .................................................. H S ...................................................... i< B ~-. ,:,; ,::!1 ,.. ::.;' ,::~. '..-.~ 7E, il ............................................... hi ti F:: T H S i... 0 P E .................................... HG F;'i" H SLOPE ........... , ........................ H L.i F' F:' ...................................... C: R 0 ij .................................... i I 500, 008 ' I I 597', Oi]O ............................................... i!D94, O()fl ................................................. 4, 0 () 0 .................................. ' .................. 9, 0 ()f) ...................................................... '! 72, 88 O t '72, t)() 8 ................................................. F:'R E S H F L.. 0!,.! I... ! hi E ...................................... ::.~ 8, 0 0 () E, E,, E5 6 0 .................................................... i'i E P: :3 U F'. E [:, 2, E: 7' () ';:' i , 5 0 0 ................................................... H E t:~ S U R E i) U f'~ ':~ T T :','." F' E C ?'. T r5 Ci 5 4- !'5 E, 5 0 i-i 4 i'; ;c, .~-] !"t !} 4 ii E. F5 Ci 0 3; E. E; f} !'} :]'; E. F-'. ,i:-' T. r,.., :!; .:~- E, A ~', 'T'. ,_,r' ._,':"' ,4. r:, R Fi .:, .:, :..._.., .b ci ,.:, ,:_ i:-, :", ('i '7 .5 ~::. .. ,.,, CL. -._, ~"~ I"! ':::' r" E! ti 2 ';? q () () i () E, 5 I] !') i E1 :E, ?:; " l"~.. n ,..~ 2 fl .. ~.b ._, O. ;"~ '.'.:: ]]. A _ ._, F' 'T ,,';l 3 4 5 F T () 3 4 E, F T ('~ :3 4 E, E: F T 0 :]: 4 :E, :El H F.'. 0 2 4 5 E: i4 F;: C! ¥ 4 e', :3 E:' E G F' n i 4 :5 D E !] F C! i 4 E: 8 ~"~ 2 2 () E, 5 C P 0 ;;fi: -...~.'~ /'; E: 0 H H H ') 2 4 6 0 H i"'i !'"i I'~ 2 4 E, D i.::.': (;',. F'(] :2. 4 E, :..'_': () 2 'i 2 6 !3 H i"i i"i ~ 2 4 :.:-i!, ] 2 i :;i: 5 G Fi A F: lq P, F.: T T 0 ::i: C iq L t._i i'"i E: ~ ,r.~: C4 .r._:. R E:' E i"-" T H F E E T [:, E F' T T E H I '"~ ~ ';' I ..... t, C~ E L., E'.', '.3 T E H S ('.~ R t t;i g R C-i [-.'ii G ~::~ F:' :[ ti C: ~.'-I L. i 1 t'i E R r2 E i H C f:~ t... I F F [) C: I f"I E F.'. C-; E C P S F F £)C H F: P C t H E R E; IE C: F' S t'-4 F D C R l...l O B I H E Fi: C:; g El ,-." C ::?, R H () D Fi H 0 J tt E R C.,:i E S ,.." C': 2: D F..: H 0 F C: t',t L. 1 M E: R iS E C: P S F' C N L. H C: H L. 1 M E R g E C: F' S H C: f'.t L C E,t.. ! C Ot'I F'LI'I'E D F'U [:, I::' H :[ I',1P H S ~ C 0 H F' U 'I' E [) S S F' U i".i F' H i ..' 1t ..... P. '~::i T } C O {"i F' UTE D "~;'''''':' T M E R G. E Z H E: r~, l":: [.-.-. p ,o ,:. M E R (:~ E C P S M E F..' G E C:i ,." C E: H E R G E F:; ,.." E 3 t'I E R G E C F' S !'i E R !.] E C P :3 C (:)t'"I F' U T F' U C 0 H F' U T I::' C': O i"1 F: U T - ............ 'l:' ',/p E E~ E S C R .~ P 3' i 0 H i'iN E !':i ! D Fj R [:, E F.: ~ F':,' h' ! i...!NiT LO il)~..'-- F' T .!, ,4, 7',=":'-~ ''~ '::..-. F T T E hi :3 Fl F.. R G E 3 d 7 2,4 9 L E', S-' 8 F-: H E R ~]-' E .!, 4 7 2 4 ':::~ G F~ P .( ,..."" A L iH E F.: G E ...,':' ,-: '~ :: ":'.- '-,"i ,".... i i'--J F l-- [) C N b. k..' L:; l:_ :Z 4 7 2 4 '?-L: !'-' 'S i',l F [:, CM E F.: G E 3 .'~ 7 2 4 9 C F' S R i40 i:~', i't E R ~] E :.i'; .i 7 24. 9 ~] ,.-" F: :2; [:, i:,", Fi 0 hi E R G E 3 4 7 2 49 ~] ;-': C: 2: F E'. N L i'i E R G E 3 4 7 ::':: 4 '::~ C' F' 8 H C f.-~ L i'l E R 13.' E :";447' 2 4 9 C F' 8 [.'. P H i C 0 f"t P Li T 3 .'.i. 7' 2 49 F' U i'.4PH l CF~!"iF'UT ::54.7"-2-'49 PU N F.'. A T C 0 H P U T 3 4 7 2 4. 9 .............. 2 4 2 ,_,"' i . 9 9 '2: 0 'i '::;' 8 i 0 9 4 i 0 .i i 0 0 'i 0 'I 7' ',-"~ :,7.: 'i ~] 'i 7 :q .!': ~tt 0 0 0 0 'i i ';-! '2 2 0 ii .'"' ('1 4 0 'i 68 ,'-i.'- Il, i ~g F':. 4 0 i 6 ',?, 4 0 'i 6 E.', ~. g 'i ~::, 8 4 0 i 6 l"l ('i i"i i'l {'1 ~"~ I"{ ~]i] n ~'~ i-I i-I Ii n l~t !i ~'1 _ , .......... . ,.., .... ,_, _ - . f'It],-,g~"tfl Fl;]FtgFIg flOSL];';'fi 0ii) 8!31'}!i)800000 )~')OOl]O 0 a ....... ~'~ ~'~ 0 () ,.:,', g ................ ~-~~.'-, ~.', ,',~ g f'i ~' ~y' ~' g ..... · J . .. , [' EPT F f": i,i L T E i',! i',( C I',i L [.':, P H i E:, R i-i 0 i:iF, 4.4, 000 0, Ci 0 O 0, 0 0 0 0, 0 ()() i t5,44, r~O0 i 2 :], 600 ;-3, 000 · 4,, 3 f' 0 ,:..i. i ."; , i'i C.I 0 2,22:...' 5ii , -4. 5 'i !44-4, OOO 'i 6 0,200 36:39, 0()0 .770, i 0 n :q , ,'-" 6 0 2 7 , 2 6 () 39 2'., i 0 () i , :5,4. '"'~ 55i ,;?Of-~ ! 'l .7.'; 4 ,'.-i., fi 00 i Fl5,200 .7':82i , 000 305,30 .~; 2 q.., 2 ,.'": 0 i , 9 2 9 :":, 't 5,4 00 2.'_' 264 :2: '? 2 8, 0 00 2 9 8,9 0 O i 6,600 24, t 21 :3, E: 8 0 2:3,4 9 fl 5 .L:: 9, :"::, 0 ~.') i , 9 7' E~ L] i i::, I I i 4 4, 0 0 O i..o'::'; "', t; 0 0 :37' 72, 000 3.: 07,600 34,200 i 4 , '37' 0 fJ '" 00 O 1i0 4,.,, :':': 34,7' 00 37 '3 t , 000 4 2 7, I O 0 I 9, i 00 t 4,7 :-! ','::' ~ ,::~ c () i 3 · 5.2 'i 4 fi'. 3, 000 i , ;287 02 2 109,44, 000 222.:, 600 S 6 '5 0, 0 0 0 3 6 i , 6 0 0 t 9', 500 2 i , 9.3 8,9 7 0 2 (), 9 i 0 F-; 0:5, .'?.': 00 i , E, 2 6 0 32 2. ()4, i 00 ,3655, 000 .':.:! 3 S, ! ()0 22, ;2 00 722,6 O 0 i , 66 i 6:3 0 00 0 i 0 ';:"4 9 367' 4 , 0 0 0 2 i 2.5 (;' () 145,7'0 0 ;:20, ';::' 8 ::3 04 0 I ]644,0ti0 i 4 ! , 0 0 0 - .. ? 0 0 0 .?.', :." ii ..:, , -":, c, 4 :3 fl g:. I,,? : .... 5 3,8 0 0 ;]-:' 'l 4 5 6 21 ,4 C,t 0 F.; 0,5 O 0 :37()3, 000 i 0 0 '"' 00 .7, 0 fi '7 i 22 ;.';?. 00 D F-H ? LEi Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD G - 19 500292159900 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 20-SEP-95 5967.03 HARPER S. SHIRZADI 12 liN 13E 3745 3004 67.06 0.00 40.41 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10595.0 3RD STRING 7.000 11425.0 PRODUCTION STRING 4.500 10291.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 SWS 06-JUN-86 BASELINE DEPTH 10602.0 10605.0 10612.5 10622.5 10626.5 10627.0 10647.0 10648.0 10649.0 10659.0 10659.5 10679.0 10679.5 GRCH 10600.5 10605.0 10611.0 10620.5 10623.0 10623.5 10646.0 10647.0 10647.5 10657.5 10658.5 10678.0 10679.0 EQUIVALENT UNSHIFTED DEPTH 47.00 26.00 12.60 10705.5 10706.5 10724.0 10725.5 10732.0 10735.5 10737.5 10743.5 10744.0 10753.5 10754.5 10761.0 10761.5 10762.5 10764.5 10772.0 10780.5 10781.0 10784.0 10791.0 10792.0 10805.0 10818.5 10819.0 10820.0 10829.0 10830.0 10840.0 10853.0 10853.5 10854.0 10856.0 10860.0 10861.0 10879.5 10880.5 10881.0 10883.5 10885.0 10886.0 10893.5 10896.5 10897.0 10905.5 10916.5 10917.5 10918.0 10919.0 10922.5 10928.0 10928.5 10929.0 10930.0 10931.0 10933.0 10970.5 10974.5 10975.5 10977.5 10980.5 10705.0 10705.5 10722.5 10724.0 10731.0 10733.5 10735.0 10741.0 10742.0 10751.5 10752.0 10758.5 10759.5 10760.5 10764.5 10772.0 10779.5 10780.0 10782.0 10789.0 10789.5 10802.5 10817.0 10817.5 10818.0 10827.0 10827.5 10837.5 10852.5 10853.0 10853.5 10854.5 10858.5 10859.0 10877.5 10878.0 10878.5 10882.5 10884.0 10884.5 10892.0 10893.5 10894.0 10903.5 10914.5 10915.0 10915.5 10917.0 10920.5 10926.5 10927.0 10928.0 10929.0 10929.5 10931.5 10969.5 10973.5 10974.0 10977.0 10979.5 11042.0 11044.0 11056.0 11059.0 11070.5 11073.5 11137.5 11138.0 11139.0 11149.5 11181.5 11193.5 11194.5 11195.5 11196.0 11205.5 11206.5 11255.0 11270.0 11276.5 11278.5 11279.0 11280.5 11324.5 11327.5 11338.0 11340.5 11350.0 11367.5 11368.5 11388.0 11391.5 11392.0 11394.5 11395.0 11396.0 11405.0 11405.5 11406.5 11415.0 11416.0 $ REMARKS: 11041.5 11043.5 11055.0 11058.0 11070.0 11073.0 11137.5 11138.0 11138.5 11149.0 11181.5 11193.5 11194.0 11195.0 11196.0 11205.5 11206.0 11255.0 11270.0 11276.0 11278.0 11280.5 11282.0 11324.5 11328.0 11338.5 11341.5 11350.5 11368.0 11368.5 11388.0 11390.5 11391.5 11394.0 11395.0 11396.0 11405.5 11406.0 11406.5 11415.0 11415.5 CN/GR Cased Hole. CORRELATED WITH BHCS OF 20-JUN-86. WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NET WATER RATE FORMATION GAS RATE GOR LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE 06-SEP-95 HOURS MBPD MBOPD MBWPD MMSCFD SCF/STB MMSCFD PSIG SCF/STB SCF/STB PSIG 4.0 1.06 1.02 0.03 13.83 13822 0.00 0 13822 13372 50.0 1818 MANIFOLD TEMPERATURE DEGF 119 WATER CUT (CALC) PCNT 3.3 PASS 1 ENCOUNTERED GAS IN THE WELLBORE AT 11000' MD. PASS 2 ENCOUNTERED GAS IN THE WELLBORE AT 10670' MD. PASSES 3, 4, AND 5 HAVE NO GAS IN THE WELLBORE. PASSES 3, 4, AND 5 USED FOR AVERAGE. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ??MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10550.0 10550.0 BASELINE DEPTH NPHI 10572.5 10572.0 10598.5 10597.0 10603.5 10603.5 10605.0 10605.0 10612.5 10611.0 10622.5 10620.5 10626.5 10623.0 10627.0 10623.5 10647.0 10646.0 10649.0 10647.5 10659.5 10656.5 10679.5 10677.5 10687.0 10684.5 10694.0 10692.5 10710.5 10710.5 10717.0 10716.5 10725.0 10724.5 10741.0 10739.5 10753.5 10751.5 10754.5 10752.0 10761.0 10758.5 10761.5 10759.5 10762.5 10760.5 10764.5 10764.5 10772.0 10772.0 10780.5 10779.5 10781.0 10780.0 10784.0 10782.0 10787.5 10785.0 10791.0 10789.0 10792.0 10789.5 10798.0 10797.5 10805.0 10802.5 10818.5 10817.0 10819.0 10817.5 10820.0 10818.0 10829.0 10827.0 10830.0 10827.5 10835.5 10832.5 files. STOP DEPTH 11431.0 11441.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 10840.0 10853.0 10853.5 10854.0 10856.0 10860.0 10861.0 10879.5 10880.5 10881.0 10883.5 10885.0 10886.0 10893.5 10896.5 10897.0 10905.5 10916.5 10919.0 10922.5 10928.0 10929.0 10933.0 10970.5 10974.5 10975.5 10977.5 10980.5 11042.0 11044.0 11056.0 11059.0 11072.0 11078.0 11137.5 11138.0 11139.0 11149.5 11181.5 11193.5 11194.5 11195.5 11196.0 11205.5 11206.5 11241.0 11255.0 11264.5 11270.0 11276.5 11278.5 11279.0 11280.5 11286.0 11288.0 11324.5 11327.5 11338.0 11340.5 11350.0 10837.5 10852.5 10853.0 10853.5 10854.5 10858.5 10859.0 10877.5 10878.0 10878.5 10882.5 10884.0 10884.5 10892.0 10893.5 10894.0 10903.5 10914.5 10917.0 10920.5 10926.5 10928.0 10931.5 10968.5 10973.5 10974.0 10977.0 10979.5 11041.5 11043.5 11055.0 11058.0 11070.5 11078.5 11137.5 11138.0 11138.5 11149.0 11181.5 11193.5 11194.0 11195.0 11196.0 11205.5 11206.0 11242.5 11255.0 11263.5 11270.0 11276.0 11278.0 11280.5 11282.0 11286.5 11289.0 11324.5 11328.0 11338.5 11341.5 11350.5 11360.0 11364.5 11367.5 11368.5 11388.0 11391.5 11392.0 11394.5 11395.0 11396.0 11405.0 11405.5 11406.5 11415.0 11416.0 $ REMARKS: 11360.5 11363.5 11368.0 11368.5 11388.0 11390.5 11391.5 11394.0 11395.0 11396.0 11405.5 11406.0 11406.5 11415.0 11415.5 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B. OUT $ : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9306 datums Tape Subfile: 2 390 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10550.0 10550.0 STOP DEPTH 11431.0 11441.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10545.0 10554.5 10555.5 10554.0 10570.0 10569.0 10595.0 10594.0 10596.0 10594.5 10596.5 10595.5 10598.5 10597.0 10599.0 10603.5 10605.0 10605.0 10608.5 10607.0 10611.5 10617.0 10617.5 10621.5 10625.0 10626.0 10624.5 EQUIVALENT UNSHIFTED DEPTH NPHI 10544.5 10554.0 in separate files. 10596.5 10601.5 10607.5 10609.5 10615.5 10616.5 10619.5 10622.5 10626.5 10624.0 10644.5 10644.0 10645.5 10645.0 10648.5 10647.0 10654.5 10652.5 10659.5 10658.0 10663.5 10663.0 10673.5 10673.0 10680.5 10680.0 10682.5 10683.0 10686.0 10687.0 10686.5 10685.5 10688.5 10688.5 10695.5 10695.5 10699.5 10698.0 10702.0 10702.0 10705.0 10705.0 10705.5 10706.0 10707.0 10707.0 10708.0 10714.5 10717.5 10722.0 10723.0 10726.0 10726.5 10729.0 10731.0 10732.0 10733.0 10734.0 10735.0 10735.5 10736.5 10742.5 10743.0 10745.5 10750.0 10755.5 10757.5 10759.0 10763.0 10763.5 10779.0 10780.5 10782.0 10782.5 10783.0 10792.0 10793.0 10793.5 10794.0 10801.5 10802.5 10805.5 10818.5 10819.5 10827.5 10828.5 10839.5 10848.5 10849.0 10850.0 10852.0 10853.5 10855.0 10858.5 10859.0 10859.5 10861.5 10864.5 10870.0 10871.0 10880.5 10881.0 10883.5 10884.0 10884.5 10885.0 10707.5 10721.5 10722.0 10725.0 10726.0 10728.0 10734.5 10735.0 10754.0 10755.5 10761.0 10762.5 10781.0 10781.5 10790.5 10791.0 10803.5 10817.0 10838.0 10851.0 10853.0 10855.5 10860.0 10863.0 10883.0 10884.0 10715.0 10717.5 10731.0 10731.5 10732.5 10733.0 10733.5 10741.0 10742.0 10744.0 10748.5 10754.0 10756.5 10779.0 10780.5 10781.0 10791.5 10792.5 10793.5 10801.0 10801.5 10817.5 10818.0 10826.0 10826.5 10837.5 10845.5 10846.0 10852.0 10857.0 10857.5 10858.5 10869.0 10869.5 10879.0 10880.0 10883.0 10883.5 10893.0 10894.0 10895.0 10906.0 10907.0 10907.5 10908.0 10913.0 10915.5 10917.0 10936.0 10941.5 10955.5 10956.5 10964.5 10971.0 10973.5 10974.0 10975.0 10977.0 10977.5 10980.5 10995.0 11001.0 11004.0 11008.0 11010.0 11013.5 11014.0 11015.0 11015.5 11031.0 11038.0 11042.0 11043.5 11044.5 11045.0 11048.5 11051.5 11055.5 11061.5 11071.5 11077.5 11082.5 11085.0 11086.5 11094.5 11095.5 11130.0 11130.5 11131.5 11133.0 11134.0 11137.0 11138.0 11139.0 11148.0 11149.0 11149.5 11176.5 10893.0 10893.5 10906.0 10907.0 10916.0 10970.5 10974.5 10977.5 10979.5 10994.5 11000.5 11002.5 11041.0 11084.5 11137.0 11138.0 11138.5 11147.5 11148.0 11148.5 10892.0 10905.0 10905.5 10911.5 10914.5 10934.5 10941.0 10955.0 10955.5 10963.0 10972.0 10973.0 10976.5 11007.5 11009.0 11013.0 11013.5 11014.0 11015.0 11030.5 11038.0 11043.5 11044.0 11044.5 11048.5 11050.5 11054.5 11060.0 11070.0 11078.0 11083.0 11087.5 11095.5 11096.0 11131.0 11131.5 11132.0 11133.5 11134.0 11176.5 11181.5 11182.0 11183.5 11184.0 11184.5 11185.0 11191.0 11191.5 11194.5 11195.0 11196.5 11197.0 11198.5 11203.5 11205.5 11207.0 11207.5 11208.0 11208.5 11213.0 11222.0 11223.0 11226.5 11235.0 11237.5 11255.5 11264.5 11268.0 11270.0 11273.0 11273.5 11279.5 11280.5 11281.5 11294.5 11295.0 11296.0 11296.5 11308.5 11327.5 11332.0 11333.0 11336.5 11337.0 11339.0 11340.0 11343.5 11344.5 11351.5 11352.5 11354.0 11361.0 11364.5 11365.5 11372.5 11373.5 11376.5 11377.0 11379.5 11382.5 11181.5 11184.0 11184.5 11194.0 11195.0 11196.0 11205.0 11205.5 11206.5 11255.0 11269.5 11328.0 11332.0 11333.0 11337.5 11344.5 11345.0 11352.0 11352.5 11364.5 11365.0 11372.0 11372.5 11378.0 11378.5 11379.0 11382.0 11181.5 11183.0 11183.5 11190.0 11191.0 11196.0 11197.0 11198.5 11202.5 11206.5 11207.0 11213.0 11222.0 11222.5 11226.0 11236.5 11240.0 11263.0 11267.0 11273.0 11273.5 11280.5 11281.5 11282.0 11295.0 11295.5 11296.0 11296.5 11310.0 11339.0 11341.0 11341.5 11354.5 11361.0 11383.0 11386.5 11388.5 11391.5 11394.0 11395.0 11405.5 11406.0 11409.0 11413.5 11428.5 11429.5 11436.0 $ REMARKS: 11386.5 11388.5 11391.0 11405.0 11406.0 11394.5 11395.0 11409.0 11414.0 11427.5 11428.0 11436.0 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT /??MATCH2B.OUT $ : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9306 datums Tape Subfile: 3 301 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10550.0 10550.0 BASELINE DEPTH 1O554.5 10567.5 10572.0 10587.0 10593.0 10598.5 10600.5 10605.5 10607.0 10608.5 10609.5 10610.5 10612.0 10613.0 10613.5 10617.0 10621.0 10624.5 10625.0 10628.5 10634.0 10638.0 10638.5 10645.5 10649.0 10650.0 10653.0 10654.0 10659.5 10660.0 10661.0 10661.5 10669.0 10669.5 10671.0 10675.5 10676.0 GRCH 10553.5 10566.5 10572.0 10586.5 10592.5 10600.0 10605.5 10607.0 10607.5 10623.5 10625.5 10627.5 10645.0 10659.5 10660.0 10669.5 10675.5 STOP DEPTH 11431.0 11441.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10554.0 10593.5 10599.0 10609.0 10609.5 10611.0 10611.5 10612.5 10616.0 10618.0 10633.5 10636.5 10637.5 10648.0 10648.5 10651.5 10652.0 10657.5 10659.0 10668.0 10670.0 10672.5 10673.5 10677.5 10679.0 10679.5 10682.5 10683.0 10687.0 10691.5 10694.0 10699.0 10700.5 10701.5 10702.0 10706.5 10707.5 10709.0 10710.0 10714.5 10718.0 10725.0 10725.5 10727.5 10728.5 10729.0 10730.0 10733.0 10735.0 10736.0 10738.5 10739.5 10741.5 10745.0 10746.0 10746.5 10748.5 10750.0 10750.5 10752.0 10753.0 10754.0 10754.5 10755.5 10757.5 10762.0 10764.0 10764.5 10779.0 10779.5 10782.0 10782.5 10783.5 10787.5 10793.5 10794.0 10796.0 10797.0 10798.0 10800.0 10803.0 10804.0 10805.0 10678.0 10707.0 10707.5 10709.0 10709.5 10728.5 10729.0 10734.0 10734.5 10744.5 10745.5 10747.0 10749.0 10751.0 10751.5 10754.0 10755.5 10760.0 10762.0 10762.5 10781.0 10781.5 10782.0 10794.5 10795.0 10796.0 10798.0 10803.0 10676.5 10677.5 10680.5 10681.5 10685.5 10692.0 10695.0 10699.5 10701.0 10701.5 10702.5 10715.0 10718.0 10725.0 10726.0 10728.0 10728.5 10733.0 10734.0 10737.5 10738.0 10740.0 10744.0 10749.0 10752.0 10753.0 10780.0 10780.5 10781.0 1o786.o 10792.5 10793.5 10802.5 10803.0 10810.5 10811.5 10818.5 10819.5 10820.5 10828.5 10829.0 10829.5 10830.0 10838.0 10838.5 10841.5 10844.0 10849.0 10851.0 10851.5 10852.5 10855.5 10856.0 10856.5 10861.5 10862.0 10862.5 10879.0 10880.0 10881.0 10885.0 10885.5 10886.0 10905.5 10909.0 10909.5 10913.0 10914.0 10916.5 10917.5 10918.5 10919.0 10920.0 10923.0 10932.0 10933.0 10949.5 10950.0 10968.0 10974.5 10978.0 10979.0 10980.5 10983.0 10988.5 10989.0 10991.5 10993.5 11001.0 11008.0 11009.0 11009.5 11014.5 11024.5 10809.0 10810.0 10817.5 10827.5 10828.0 10836.5 10853.0 10854.5 10855.0 10883.5 10884.5 10885.0 10904.0 10907.5 10908.5 10912.0 10912.5 10915.5 10916.0 10967.5 10982.5 10994.0 10818.5 10819.0 10827.5 10828.0 10836.5 10840.5 10843.0 10847.5 10849.5 10850.5 10854.0 10855.0 10860.5 10861.0 10861.5 10878.0 10878.5 10879.5 10904.5 10917.5 10918.5 10919.5 10922.0 10931.0 10931.5 10948.0 10949.0 10973.5 10978.0 10978.5 10980.5 10988.5 10989.5 10992.0 11000.5 11007.5 11008.0 11008.5 11014.0 11024.0 11028.0 11028.5 11037.5 11042.5 11043.5 11045.0 11050.0 11054.0 11055.0 11057.0 11061.0 11061.5 11065.0 11067.5 11068.5 11071.0 11071.5 11078.0 11083.5 11092.0 11104.5 11105.0 11127.5 11131.0 11132.0 11136.5 11137.5 11138.0 11149.5 11178.0 11179.5 11180.5 11181.0 11181.5 11182.5 11183.0 11184.0 11188.5 11189.5 11196.5 11197.5 11198.0 11199.0 11204.0 11204.5 11206.0 11207.0 11208.0 11211.0 11220.5 11222.5 11226.0 11228.0 11230.5 11247.0 11247.5 11256.0 11258.0 11259.5 11260.5 11044.0 11070.5 11137.0 11138.0 11149.5 11181.5 11182.0 11182.5 11198.0 11198.5 11203.5 11204.5 11205.5 11206.0 11210.0 11247.5 11260.0 11260.5 11028.0 11028.5 11038.0 11043.0 11043.5 11044.5 11049.5 11053.5 11054.0 11056.0 11059.5 11060.0 11064.0 11066.5 11067.0 11070.0 11078.5 11084.0 11093.5 11105.5 11106.0 11128.0 11131.5 11132.0 11136.5 11137.0 11179.5 11181.0 11181.5 11184.0 11184.5 11189.0 11189.5 11196.5 11197.0 11203.5 11206.5 11220.0 11222.0 11226.0 11228.0 11231.5 11247.5 11248.0 11256.0 11258.0 11261 11264 11265 11269 11270 11271 11274 11278 11281 11283 11284 11285 11286 11289 11289 11290 11295 .5 .5 .0 .5 .5 .0 .0 .0 .5 .5 .0 .5 .5 .0 .5 .0 .0 11296.0 11305.0 11306.0 11307.5 11319.0 11322.0 11334.0 11339.5 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 40.0 42.0 43.0 45.0 46.0 48.5 50.0 57.5 58.5 73.0 74.0 76.5 77.0 79.5 80.0 87.0 91.5 05.0 06.0 06.5 16.0 11419.0 11426.0 11427.5 11429.5 11436.0 $ REMARKS: 11269.5 11278.5 11282.0 11344.0 11346.0 11346.5 11373.5 11374.0 11377.0 11377.5 11379.5 11380.5 11387.5 11391.5 11406.0 11407.0 11416.5 11426.0 PASS 3. FUCT & NUCT WERE 11260.5 11263.5 11264.5 11270.0 11271.0 11274.0 11282.5 11284.5 11285.5 11287.0 11287.5 11290.0 11290.5 11291.0 11296.0 11296.5 11305.5 11306.0 11307.5 11320.5 11323.5 11335.0 11340.5 11341.5 11343.0 11350.0 11351.5 11358.5 11359.0 11405.5 11407.5 11420.0 11426.5 11428.5 11436.0 SHIFTED WITH NPHI. /??MATCH3A.OUT / ??MATCH3 B. OUT $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18612 datums Tape Subfile: 4 340 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10550.0 10550.0 BASELINE DEPTH 10554.5 10567.0 10567.5 10593.5 10607.0 10609.5 10612.0 10614.5 10615.5 10616.0 10618.5 10622.5 10624.0 10626.5 10631.5 10632.5 10633.5 10637.0 10642.0 10645.5 10647.5 10648.5 10649.0 10653.0 10653.5 10654.5 10659.5 10661.0 10662.0 10664.0 10670.5 10672.5 10673.0 10675.5 10676.5 10681.0 10681.5 GRCH 10553.5 10566.0 10566.5 10593.0 10606.5 10608.0 10622.5 10626.5 10645.0 10647.0 10647.5 10660.0 10663.5 10672.5 10675.0 10676.5 10681.0 10682.0 STOP DEPTH 11431.0 11441.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10554.0 10610.5 10613.0 10613.5 10614.5 10617.0 10620.0 10631.0 10632.0 10632.5 10636.0 10641.5 10647.5 10651.0 10651.5 10652.0 10657.0 10659.0 10669.5 10671.5 10673.0 10682.5 10683.0 10684.0 10687.5 10690.0 10690.5 10700.0 10700.5 10703.0 10704.0 10706.5 10707.5 10714.5 10716.0 10717.0 10725.5 10726.0 10726.5 10728.0 10729.0 10729.5 10730.0 10731.0 10732.0 10732.5 10733.0 10734.0 10735.0 10736.0 10737.0 10737.5 10738.0 10739.5 10740.5 10742.5 10743.0 10753.0 10754.0 10755.0 10757.0 10760.0 10762.0 10763.0 10763.5 10776.5 10777.0 10778.0 10780.0 10783.5 10791.0 10792.0 10793.0 10793.5 10800.0 10801.0 10804.5 10819.0 10820.0 10826.0 10826.5 10683.5 10684.0 10706.5 10707.0 10715.5 10716.0 10725.0 10726.0 10728.5 10729.0 10733.0 10733.5 10734.5 10735.0 10735.5 10736.5 10753.5 10755.0 10760.0 10760.5 10761.0 10775.5 10776.0 10776.5 10789.5 10790.0 10802.5 10817.5 10824~5 10825.0 10680.0 10681.0 10685.5 10690.5 10691.0 10700.0 10701.5 10704.0 10704.5 10715.0 10725.0 10727.5 10729.0 10730.0 10731.0 10731.5 10732.5 10733.0 10733.5 10734.0 10738.5 10739.0 10741.0 10742.0 10751.0 10751.5 10757.5 10779.0 10782.0 10791.5 10793.0 10799.5 10800.0 10818.0 10818.5 10827.0 10828.5 10829.5 10839.0 10839.5 10840.0 10851.0 10851.5 10853.0 10854.0 10856.0 10857.0 10857.5 10858.0 10860.0 10860.5 10861.5 10865.0 10866.0 10869.0 10869.5 10872.0 10879.5 10880.0 10880.5 10883.0 10883.5 10884.5 10889.5 10892.5 10893.0 10895.0 10899.5 10906.0 10907.0 10915.0 10915.5 10917.5 10918.0 10924.0 10928.5 10933.0 10934.0 10941.5 10948.5 10956.5 10963.5 10964.0 10966.5 10967.0 10968.0 10968.5 10975.0 10976.5 10987.0 10987.5 10992.5 10999.5 11001.0 11001.5 10825.5 10838.0 10852.5 10855.5 10858.0 10859.0 10878.0 10879.0 10879.5 10881.5 10882.0 10882.5 10888.5 10891.5 10892.5 10894.0 10898.0 10905.0 10905.5 10916.0 10917.0 10927.5 10966.0 10966.5 10967.0 10968.0 10827.0 10827.5 10837.0 10838.0 10838.5 10850.5 10851.0 10855.0 10857.0 10857.5 10858.0 10860.5 10864.0 10864.5 10867.5 10868.5 10870.5 10879.0 10882.5 10884.0 10904.5 10913.5 10914.5 10923.0 10931.5 10932.5 10940.0 10946.5 10955.0 10962.0 10963.0 10974.0 10976.0 10986.5 10987.5 10992.5 10999.0 11000.5 11001.5 11003.5 11006.0 11011.0 11019.5 11020.0 11024.0 11025.0 11032.0 11034.5 11035.0 11036.0 11043.5 11046.5 11049.0 11052.0 11056.5 11065.5 11071.5 11079.5 11081.5 11087.5 11095.0 11096.0 11101.5 11102.0 11103.0 11109.0 11129.5 11134.0 11136.5 11137.5 11140.0 11145.5 11146.0 11182.0 11184.5 11186.0 11195.5 11196.0 11199.5 11201.5 11202.5 11204.5 11205.0 11206.0 11207.0 11207.5 11215.5 11216.5 11220.5 11223.0 11224.0 11256.0 11257.0 11265.0 11265.5 11266.0 11268.5 11269.5 11270.5 11136.0 11136.5 11139.0 11144.5 11145.5 11204.0 11205.0 11256.0 11256.5 11264.5 11265.0 11267.5 11269.5 11003.5 11005.5 11010.5 11018.5 11019.5 11023.5 11024.0 11031.0 11035.0 11035.5 11036.0 11043.5 11045.5 11048.0 11051.0 11055.5 11064.0 11070.0 11080.0 11082.0 11088.5 11096.0 11096.5 11103.0 11103.5 11104.0 11110.0 11129.5 11134.0 11181.5 11184.0 11185.5 11195.0 11196.0 11199.5 11202.5 11203.5 11204.5 11206.0 11206.5 11207.0 11215.5 11216.5 11220.0 11222.5 11223.0 11264.0 11264.5 11265.0 11268.5 112 112 112 112 113 113 113 113 113 113 113 113 71.5 80.0 81.0 82.0 07.5 08.5 24.5 26.5 27.5 29.5 32.5 34.0 11335.0 11337.5 11341.5 11345.0 11346.0 11350.0 11351.5 11361.0 11361.5 11362.0 11362.5 11363.5 11364.0 11371.5 11372.5 11373.0 11378.0 11378.5 11380.5 11381.0 11385.0 11388.0 11391.5 11392.5 11397.5 11398.0 11398.5 11399.5 11404.0 11405.0 11413.0 11416.5 11419.0 11426.0 11426.5 11427.5 11429.0 11434.5 11437.5 $ REMARKS: 11282.5 11325.0 11327.0 11328.0 11329.5 11334.0 11335.5 11345.5 11346.0 11361.5 11362.5 11363.0 11363.5 11371.5 11372.0 11372.5 11378.0 11378.5 11380.0 11381.0 11385.0 11387.5 11391.0 11391.5 11396.5 11397.5 11403.5 11405.0 11416.5 11426.0 11426.5 PASS 4. FUCT & NUCT WERE 11272.5 11281.0 11281.5 11308.0 11308.5 11330.0 11333.0 11338.0 11340.5 11351.0 11352.5 11360.5 11363.5 11398.5 11399.0 11399.5 11404.0 11413.5 11419.5 11426.0 11427.5 11434.5 11438.0 SHIFTED WITH NPHI. / ? ?MATCH4A. OUT /??MATCH4B.OUT $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18612 datums Tape Subfile: 5 340 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10550.0 10550.0 STOP DEPTH 11431.0 11441.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10555.5 10554.0 10558.5 10557.5 10567.5 10566.0 10569.5 10568.0 10578.0 10577.5 10593.5 10593.0 10603.5 10603.0 10605.5 10606.0 10611.5 10611.0 10612.5 10611.5 10611.5 10613.5 10612.0 10618.0 10616.5 10622.0 10621.0 10619.5 10623.0 10621.5 10625.0 10623.5 10626.0 10624.0 10622.5 10626.5 10624.5 10640.0 10639.0 10641.0 10640.0 10639.0 10644.5 10642.5 10646.0 10645.5 10649.0 10648.5 10650.0 10649.0 10651.0 10649.0 10652.0 10649.5 10653.5 10651.0 10654.0 10652.0 10659.0 10657.0 10660.0 10657.5 10660.5 10659.5 10661.0 10658.5 10663.0 10661.0 10664.0 10664.0 10664.5 10662.5 10666.0 10666.0 10667.0 - 10666.5 10668.5 10668.5 10667.5 EQUIVALENT UNSHIFTED DEPTH NPHI 10669.0 10673.0 10674.0 10674.5 10675.5 10676.5 10677.0 10678.0 10681.5 10682.5 10683.5 10686.0 10688.5 10691.5 10695.0 10696.0 10696.5 10697.0 10701.0 10703.5 10706.0 10706.5 10707.0 10708.0 10718.5 10719.5 10720.5 10726.0 10726.5 10728.5 10729.5 10735.0 10735.5 10737.5 10740.5 10746.0 10747.0 10750.5 10751.5 10753.5 10755.5 10757.5 10760.5 10761.5 10782.0 10782.5 10785.5 10792.0 10793.0 10793.5 10794.5 10797.0 10799.0 10799.5 10802.0 10803.0 10805.5 10810.5 10818.5 10819.0 10673.0 10673.5 10675.0 10678.0 10683.5 10689.0 10695.5 10696.0 10696.5 10697.5 10706.5 10707.0 10707.5 10718.0 10718.5 10725.0 10726.0 10728.0 10728.5 10734.0 10736.0 10739.0 10754.0 10755.5 10780.0 10781.0 10790.5 10791.0 10803.5 10817.5 10668.0 10672.5 10674.5 10675.5 10680.0 10680.5 10684.0 10686.5 10689.5 10700.5 10703.0 10707.0 10720.0 10720.5 10735.0 10736.5 10745.0 10745.5 10749.0 10749.5 10751.5 10759.0 10759.5 10784.0 10791.5 10793.5 10794.5 10796.5 10798.5 10799.5 10802.0 10802.5 10808.0 10817.5 10818.0 10820.0 10828.5 10829.5 10831.5 10832.0 10839.5 10840.0 10848.0 10854.0 10860.0 10860.5 10861.5 10865.0 10871.0 10872.0 10875.5 10880.5 10886.5 10890.0 10906.0 10911.0 10912.0 10914.0 10915.5 10917.5 10924.5 10925.0 10931.0 10932.0 10935.0 10946.5 10947.5 10953.5 10963.5 10964.0 10968.5 10976.0 10976.5 10980.0 10980.5 10981.5 10982.5 10986.0 10986.5 10987.0 10998.0 11001.5 11010.5 11019.0 11019.5 11024.0 11025.0 11027.5 11028.0 11029.0 11030.0 11043.5 11045.0 11046.0 11054.0 10827.5 10828.0 10838.0 10838.5 10860.0 10863.5 10874.0 10885.5 10889.0 10904.5 10914.0 10916.0 10968.0 10986.0 10998.0 11043.0 10818.5 10827.0 10827.5 10829.5 10830.5 10838.5 10848.0 10852.5 10858.5 10859.5 10870.0 10870.5 10879.0 10905.0 10909.5 10910.5 10912.5 10923.0 10924.0 10930.0 10930.5 10933.5 10946.5 10947.5 10952.0 10962.0 10963.0 10975.0 10976.0 10979.5 10980.5 10981.5 10982.0 10986.0 10987.0 11001.5 11010.0 11018.5 11019.5 11024.0 11024.5 11027.0 11028.0 11029.0 11029.5 11044.5 11045.0 11053.0 11061.0 11064.0 11064.5 11066.0 11067.0 11071.5 11079.0 11085.5 11086.5 11087.0 11095.5 11096.5 11103.5 11104.5 11107.5 11113.0 11114.0 11128.0 11129.5 11130.5 11131.5 11133.0 11134.0 11136.5 11137.0 11146.5 11147.0 11178.0 11183.0 11184.5 11185.0 11188.0 11193.0 11194.0 11196.0 11196.5 11199.5 11201.5 11202.5 11205.0 11206.0 11207.0 11207.5 11208.0 11216.5 11217.5 11221.5 11222.5 11223.5 11227.0 11234.0 11235.0 11246.0 11260.5 11261.0 11262.0 11262.5 11263.5 11264.5 11265.0 11136.0 11145.5 11146.5 11184.0 11185.0 11193.0 11193.5 11206.5 11207.0 11245.5 11260.0 11261.0 11059.5 11062.5 11063.5 11065.0 11065.5 11070.0 11079.5 11086.0 11087.5 11088.5 11097.0 11097.5 11104.5 11105.0 11108.0 11113.0 11114.0 11126.5 11130.0 11131.0 11131.5 11133.0 11133.5 11136.0 11178.5 11183.5 11184.5 11187.5 11195.5 11196.5 11199.5 11203.5 11204.5 11206.0 11206.5 11208.0 11216.5 11217.0 11221.0 11221.5 11222.0 11225.5 11235.0 11236.0 11261.0 11261.5 11262.0 11263.0 11264.0 11268.0 11268.5 11269.0 11270.5 11271.0 11271.5 11272.0 11284.5 11285.0 112 112 112 112 112 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 89.0 90.0 95.0 96.0 96.5 06.0 09.0 17.0 18.0 22.0 24.5 25.5 31.0 40.0 43.0 43.5 44.5 59.0 59.5 63.5 64.5 96.0 98.0 04.0 07.0 07.5 08.5 11413.5 11414.0 11416.0 11416.5 11419.0 11426.0 11434.0 $ REMARKS: 11268.0 11269.0 11271.0 11286.0 11286.5 11305.0 11322.0 11331.0 11344.0 11344.5 11345.0 11364.0 11364.5 11407.0 11408.0 11416.5 11426.0 11267.0 11268.0 11268.5 11271.5 11272.0 11273.0 11290.0 11290.5 11295.5 11296.0 11296.5 11310.5 11318.5 11319.0 11325.5 11326.0 11341.5 11358.5 11359.5 11396.0 11398.5 11404.5 11408.5 11413.5 11414.5 11417.0 11419.5 11434.5 PASS 5. FUCT & NUCT WERE SHIFTED WITH NPHI. /??MATCH5A.OUT /??MATCH5B.OUT $ CN : BP EXPLORATION WN : G - 19 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) (ALASKA) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 38 1006 BYTES * Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27918 datums Tape Subfile: 6 332 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 3, 4, 5 3, 4, 5 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR PASSES 3, 4, & 5 ONLY. $ : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 11460.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27918 datums Tape Subfile: 7 61 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10541.0 2418 10550.0 $ LOG HEADER DATA STOP DEPTH 11447.0 11457.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SBAR PCM GR CN $ SINKER BAR SINKER BAR PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): ~ 07-SEP-95 FSYS REV. J001 VER. 1.1 2135 07-SEP-95 11554.0 11443.0 10550.0 11441.0 1800.0 YES TOOL NUMBER 8248EA/8250EA 8262XA 2418XA 0.000 11425.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) !014 BYTES * Total Data Records: 133 Tape File Start Depth = 11460.000000 Tape File End Depth = 10531.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61372 datums Tape Subfile: 8 Minimum record length: Maximum record length: 209 records... 62 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10538.0 2418 10548.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11446.0 11456.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SBAR PCM GR CN $ SINKER BAR SINKER BAR PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 07-SEP-95 FSYS REV. J001 VER. 1.1 2213 07-SEP-95 11554.0 11443.0 10550.0 11441.0 1800.0 YES TOOL NUMBER 8248EA/8250EA 8262XA 2418XA 0.000 11425.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 133 Tape File Start Depth = 11459.000000 Tape File End Depth = 10531.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61336 datums Tape Subfile: 9 Minimum record length: Maximum record length: 209 records... 62 bytes 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10538.0 2418 10548.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 11446.0 11456.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SBAR PCM GR CN $ SINKER BAR SINKER BAR PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 07-SEP-95 FSYS REV. J001 VER. 1.1 2252 07-SEP-95 11554.0 11443.0 10550.0 11441.0 1800.0 YES TOOL NUMBER 8248EA/8250EA 8262XA 2418XA 0.000 11425.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :G-19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 133 Tape File Start Depth = 11460.000000 Tape File End Depth = 10532.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 94790 datums Tape Subfile: 10 Minimum record length: Maximum record length: 209 records... 62 bytes 1014 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE GR 2418 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): START DEPTH 10541.0 10550.0 STOP DEPTH 11446.0 11456.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SBAR PCM GR CN $ SINKER BAR SINKER BAR PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 07-SEP-95 FSYS REV. J001 VER. 1.1 2329 07-SEP-95 11554.0 11443.0 10550.0 11441.0 1800.0 YES TOOL NUMBER 8248EA/8250EA 8262XA 2418XA 0.000 11425.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.00O 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 4. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 133 Tape File Start Depth = 11459.000000 Tape File End Depth = 10531.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 94754 datums Tape Subfile: 11 Minimum record length: Maximum record length: 209 records... 62 bytes 1014 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 5 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10542.0 2418 10551.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11446.0 11456.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SBAR PCM GR CN $ SINKER BAR SINKER BAR PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 07-SEP-95 FSYS REV. J001 VER. 1.1 0007 08-SEP-95 11554.0 11443.0 10550.0 11441.0 1800.0 YES TOOL NUMBER 8248EA/8250EA 8262XA 2418XA 0.000 11425.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 5. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : G - 19 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 133 Tape File Start Depth = 11459.000000 Tape File End Depth = 10531.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 128208 datums Tape Subfile: 12 Minimum record length: Maximum record length: 209 records... 62 bytes 1014 bytes Tape Subfile 13 is type: LIS 95/ 9/20 01 **** REEL TRAILER **** 95/ 9/21 01 Tape Subfile: 13 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 21 SEP 95 7:34a Elapsed execution time = 4.73 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER COMPANY NAME : BP EXPLORATION WELL NAME : G-19 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292159900 REFERENCE NO : 98266 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/06/ 9 ORIGIN : FLIC REEL NA~E : 98266 CONTINUATION # : PREVIOUS REEL : COf4~F2TT : BP EXPLORATION, PRUDHOE BAY, G-19, API #50-029-21599-00 **** TAPE HEADER **** SERVICE NAFiE : EDIT DATE : 98/06/ 9 ORIGIN : FLIC TAPE NAME : 98266 CONTINUATION # : 1 PREVIOUS TAPE : COF~iENT : BP EXPLORATION, PRUDHOE BAY, G-19, API #50-029-21599-00 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NAME: G-19 API NUMBER: 500292159900 OPERATOR: BP Exploration LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 9-JUN-98 JOB NUMBER: 98266 LOGGING ENGINEER: J. Spencer OPERATOR WITNESS: A. Coleman SURFACE LOCATION SECTION: 12 TOWNSHIP: 1 IN RANGE: 13E FNL: 3744 FSL: FEL: 3003 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 67.06 DERRICK FLOOR: 66.06 GROUND LEVEL: 37.86 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 7. 000 11600.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 11410.0 11383.0 11382.5 11367.5 11359.0 11354.5 11349 0 11341 0 11324 5 11282 5 11263 5 11261 0 11252 5 11200 5 11199 5 11187.5 11186.0 11155.0 11143.0 11073.0 11060.5 11040.0 11038.5 11020.0 11019.0 10997.5 10983.0 10970.0 10968.5 10958.0 10930.0 10926.5 10914.0 10910.5 10907.5 10889.5 10885.5 10874.5 10863.5 10860.0 10833.5 10823.0 10809.5 10802.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.0 88889.0 11411.0 11411.0 11383.5 11383.5 11368.0 11368.0 11360.0 11360.0 11355.5 11355.5 11350.0 11350.0 11340.5 11340.5 11325.0 11325.0 11283.0 11283.0 11264.5 11264.5 11261.0 11261.0 11252.5 11252.5 11201.5 11188.5 11201.5 11188.5 11156.0 11156.0 11144.0 11144.0 11074.0 11074.0 11062.0 11062.0 11041.0 11021.0 10998.0 10983.5 10971.0 10959.5 10930.0 10928.0 10916.0 10912.0 10909.0 10890.0 10886.5 10876.0 10864.5 10861.0 10835.5 10825.0 10810.5 10804.0 11041.0 11021.0 10998.0 10983.5 10971.0 10959.5 10930.0 10928.0 10916.0 10912.0 10909.0 10890.0 10886.5 10876.0 10864.5 10861.0 10835.5 10825.0 10810.5 10804.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 10796.0 10797.0 10786.5 10787.5 10785.5 10755.0 10757.0 10748.0 10749.0 10743.0 10744.5 10717.0 10717.5 10713.5 10713.5 10711.5 10711.5 10702.5 10702.5 10699.0 10698.0 10683.0 10683.0 10671.0 10671.5 10654.0 10654.0 10652.5 10617.0 10618.0 10612.5 10614.0 10611.0 100.0 101.5 $ 10797.0 10787.5 1 0757 0 10749 0 10744 5 10717 5 10713 5 10711 5 10702 5 10698 0 10683 0 10671.5 10654.0 10618.0 10614.0 103.0 CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION WELL G-19 ON 15-NOV-97. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CNTD PASS #1 GRCH TO THE BASELINE GAi~VlA RAY PROVIDED BY THE CLIENT; AND CNTD PASS #1 NPHI TO THE BASELINE GAI~VA RAY. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS ~ER: 1 DEPTH INCREMENT: 0.5000 FILE SO?~fARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11415.0 10560.0 CNTD 11439.0 10560.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 1FRAT Ch~TD 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 NCNTCNTD CPS 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 FCNTClTTD CPS 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) CFTC CNTD CPS 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1102719 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11440.000 NPHI. CNTD 31.020 NRAT. CNTD 5.139 CRAT. CNTD NCNT. CNTD 3621.432 FCNT. CNTD 704.705 CFTC. CNTD 676.808 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1667.000 CCL.CNTD 0.000 DEPT. 10561.500 NPHI. CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 30.072 TENS. CNTD -999.250 CCL.CNTD -999.250 5.167 3649.849 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .001 SERVICE : FLIC VERSION : OOiCO1 DATE : 98/06/ 9 MA3fREC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 2 DEPTH INCREMENT: 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: FILE SUmmARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11415.0 10560.0 CNTD 11439.0 10560.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NU~iBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH CNTD ............................ 88888.0 88889.5 88890.0 11433.0 11435.0 11420.0 11422.0 11412.0 11413.5 11409.5 11411.0 11401.5 11403.0 11398.0 11399.0 11392.5 11394.0 11382.5 11384.0 11383.5 11366.5 11368.0 11364.0 11365.0 11359.0 11360.0 11360.5 11354.0 11356.0 11353.0 11355.5 11349.0 11350.5 11340.5 11341.0 11334.5 11335.5 11327.0 11329.5 11320.5 11321.0 11302.5 11304.0 11296.5 11297.5 11295.0 11294.5 11291.0 11292.0 11287.5 11289.5 11284.5 11285.5 11282.5 11283.5 11281.5 11282.5 11273.0 11273.0 11266.0 11268.0 11263.5 11265.0 11259.5 11261.0 11250.5 11253.0 11233.0 11235.0 11226.0 11227.5 11209.5 11211.5 11200.5 11202.0 11193.0 11196.0 11188.0 11189.0 11186.0 11188.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 11181 5 11177 0 11151 0 11143 0 11142 0 11129 5 11099 5 11078 0 11069 0 11060 5 11052 5 11039.0 11037.5 11019.5 11018.5 11000.5 10997.0 10985.5 10982.5 10969.5 10968.0 10936.0 10926.5 10916.0 10910.5 10909.0 10898.0 10888.5 10874.0 10862.5 10859.5 10840.5 10833.5 10833.0 10823.0 10804.5 10798.5 10797.5 10795.5 10786.0 10784.5 10755.0 10747.5 10744.0 10739.5 10738.5 10731.0 10729.5 10724.0 10721.0 10716.5 10713.0 10711.5 10710.5 10707.0 11144.5 11055.5 11041.0 11021.0 10971.5 10928.0 10912.5 10890.5 10876.5 10864.5 10861.5 10836.0 10825.5 10801.0 10797.5 10787.5 10757.0 10749.5 10741.5 10732.5 l 0722.5 10717.5 10713.5 10712.0 10708.5 11185.5 11180.0 11154.0 11144.5 11131.0 11101.5 11079.5 11071.5 11062.5 11041.0 11021.5 11002.5 10997.5 10986.0 10984.0 10971.0 10937.5 10919.0 10911.5 10900.0 10876.0 10843.5 10835.5 10825.5 10807.0 10799.5 10787.5 10746.5 10742.5 10730.5 10725.5 10711.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 10704.0 10705.0 10702.0 10702.5 10688.5 10689.0 10684.0 10684.5 10682.5 10683.5 10676.0 10678.0 10670.0 10671.5 10657.0 10659.0 10656.5 10659.0 10653.5 10654.0 10652.0 10654.0 10645.5 10648.0 10618.0 10619.5 10616.0 10618.0 10612.0 10614.5 10610.0 10613.5 10608.0 10609.0 10598.0 10600.5 10597.5 10598.5 10588.0 10590.5 10585.0 10587.0 10573.5 10577.5 10565.0 10567.5 10568.0 100.0 102.5 103.0 $ REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1GRCH; AND PASS #2 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 9-JUN-1998 17:00 PAGE: 9 LIS Tape Verification Listing Schlumberger Alaska Computing Center TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 FCNTCNTD CPS 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1102719 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 11441.000 NPHI.CNTD 32.202 NRAT. CNTD 5.119 CRAT. CNTD NCNT. CNTD 3584.521 FCNT. CNTD 700.255 CFTC. CNTD 672.533 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1708.000 CCL.CNTD 0.000 DEPT. 10562.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 29.462 TENS. CNTD -999.250 CCL.CNTD -999.250 5.308 3632.506 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 10 **** FILE HEADER **** FILE NA~E : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11415.0 10550.0 CAVTD 11439.0 10550.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 11434.0 11424.5 11413.0 11410.0 11402.5 11398.5 11387.0 11383.5 11382.0 11377.0 11367.5 11359.5 11359.0 11351.5 11349.5 11340.5 11333.0 11328.0 11323.0 11302.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.0 88889.0 11411.0 11403.0 11384.0 11377.5 11368.5 11360.0 11350.5 11341.0 11332.5 11325.0 11435.0 11425.5 11413.5 11399.0 11387.5 11383.0 11360.5 11352.5 11329.5 11303.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 11 11291.0 11292.0 11288.0 11289.5 11285.0 11285.0 11281.0 11282.0 11266.0 11268.0 11263.5 11265.0 11251.0 11253.0 11233.5 11235.0 11226.0 11227.5 11219.0 11220.0 11218.5 11220.5 11208.5 11211.0 11200.5 11202.0 11198.0 11201.0 11193.0 11196.0 11188.0 11189.0 11187.0 11188.5 11177.5 11180.5 11154.5 11154.0 11143.0 11144.5 11137.0 11139.5 11131.5 11133.0 11107.5 11109.5 11070.5 11072.0 11070.0 11071.5 11060.0 11062.0 11059.5 11062.0 11040.5 11041.5 11038.0 11041.5 11020.0 11021.5 11019.5 11021.5 10999.0 10999.5 10985.0 10986.5 10971.0 10973.5 10969.5 10971.5 10968.5 10971.5 10929.0 10930.0 10927.0 10928.0 10916.5 10919.5 10910.5 10912.5 10909.5 10912.0 10889.0 10890.5 10874.5 10876.5 10874.0 10875.5 10863.0 10864.5 10860.0 10861.0 10859.5 10861.5 10841.0 10843.5 10833.5 10836.0 10831.5 10835.5 10824.0 10826.0 10823.5 10826.0 10809.5 10811.0 10807.0 10809.0 10805.0 10807.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 12 10801.5 10797.5 10796.0 10786.5 10785 0 10760 0 10755 0 10747 5 10744 5 10743 0 10739 5 10729 0 10728 5 10724 5 10717 0 10713 5 10711 5 10711 0 10702 0 10688 5 10684 0 10683 0 10671 0 10670 0 10656.0 10653.5 10647.5 10619.0 10616.5 10612.5 10610.5 10599.0 10596.0 10585.0 10581.0 10571.5 100.0 $ 10804.0 10798.0 10788.0 10757.5 10749.5 10744.5 10741.5 10730.5 10718.0 10713.5 10712.0 10702.0 10688.5 10683.0 10671.5 10654.0 10618.0 10614.5 10598.0 10573.0 101.5 10799.5 10788.0 10763.0 10746.5 10730.0 10725.5 10711.5 10684.0 10671.0 10658.5 10654.0 10649.5 10620.5 10613.5 10598.5 10586.5 10581.0 100.0 REMARKS: THIS FILE CONTAINS THE CLIPPED ANDDEPTH CORRECTED DATA FOR CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 FCNTCNTD CPS 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1102719 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 11440.000 NPHI.CNTD 31.417 NRAT. CNTD 4.671 CRAT. CNTD NCNT. CNTD 3519.349 FCNT. CNTD 753.507 CFTC. CNTD 723.678 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1674.000 CCL.CNTD 0.000 DEPT. 10550.000 NPHI. CNTD 52.644 NRAT. CNTD 7.192 CRAT. CNTD NCNT. CNTD 2188.601 FCNT. CNTD 304.304 CFTC. CNTD 292.258 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1501.000 CCL.CNTD 0.000 5.215 3686.582 7.627 2237.604 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JLrN-1998 17:00 PAGE: 14 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .004 SERVICE · FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFIBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, 3, CNTD REMARKS: THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 15 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102719 O0 000 O0 0 4 1 1 4 68 NPHI CNAV PU-S 1102719 O0 000 O0 0 4 1 1 4 68 NRAT CNAV 1102719 O0 000 O0 0 4 1 1 4 68 CRAT CNAV 1102719 O0 000 O0 0 4 1 1 4 68 NCNT CNAV CPS 1102719 O0 000 O0 0 4 1 1 4 68 FCNT CNAV CPS 1102719 O0 000 O0 0 4 1 1 4 68 CFTC CNAV CPS 1102719 O0 000 O0 0 4 1 1 4 68 CNTC CNAV CPS 1102719 O0 000 O0 0 4 1 1 4 68 GRCH CNTD GAPI 1102719 O0 000 O0 0 4 1 1 4 68 TENS CNTD LB 1102719 O0 000 O0 0 4 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT. 11440.000 NPHI.CNAV 31. 459 NRAT. CNAV 4.975 CRAT. CNAV NCNT. CNAV 3574. 743 FCNT. CNAV 719. 536 CFTC. CNAV 691. 051 CNTC. CNAV GRCH. CNTD -999. 250 TENS. CNTD 1667. 000 DEPT. 10561.500 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD 30. 072 TENS. CNTD -999. 250 5. 220 3665. 071 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 16 * * * * FILE TRAILER * * ** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT . 005 SERVICE - FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11453.5 10555.0 CNTD LOG HEADER DATA DATE LOGGED'. 15-NOV-97 SOFTWARE VERSION: 8C0 - 609 TIME LOGGER ON BOTTOM: 1041 15-NOV-97 TD DRILLER (FT) : 11451.0 TD LOGGER (FT): 11441.0 TOP LOG INTERVAL (FT) : 10555.0 BOTTOM LOG INTERVAL (FT) : 11438.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~A RAY CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) TOOL NUMBER ........... CGRS-A CNT-D 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 17 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11600.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TE~IPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Sea Water/Methanol 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Correlated to Gearhart BHCS dated 6-20-86. Pumped 15 bbls Methanol, 290 bbls sea water and then another 15 bbls methanol prior to RIH. Tagged TD at 11441' MD. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 18 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PSI 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 RCNTPS1 CPS 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PSi CPS 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1102719 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11453.500 NPHI.PS1 7.981 RTNR.PS1 2.000 TNRA.PS1 RCNT. PS1 3764.706 RCFT. PS1 1882.353 CNTC. PS1 3822.828 CFTC. PSi GR.PS1 26.324 TENS. PSi 1110.000 CCL.PS1 0.019 DEPT. 10555.000 NPHI.PS1 53.620 RTNR.PS1 7.663 TNRA.PS1 RCNT. PS1 2196.247 RCFT. PS1 286.617 CNTC. PS1 2229.592 CFTC. PSi GR.PS1 32.786 TENS.PSi 1503.000 CCL.PS1 0.000 2.115 1807.836 7. 739 275. 271 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS AUJM~ER: 2 DEPTH INCREMENT: 0.5000 FILE SUF~IARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11451.0 10554.0 CNTD LOG HEADER DATA DATE LOGGED: 15 -NOV- 97 SOFTWARE VERSION: 8C0 - 609 TIME LOGGER ON BOTTOM: 1041 15-NOV-97 TD DRILLER (FT) : 11451.0 TD LOGGER (FT) : 11441.0 TOP LOG INTERVAL (FT) : 10555.0 BOTTOM LOG INTERVAL (FT): 11438.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~IA RAY CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER CGRS-A CNT-D 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 20 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 11600.0 Sea Water/Methanol 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) .. BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): RI~4ARJfS: Correlated to Gearhart BHCS dated 6-20-86. Pumped 15 bbls Methanol, 290 bbls sea water and then another 15 bbls methanol prior to RIH. Tagged TD at 11441' MD. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 21 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 55 FT 11 56 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) FT 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 DEPT NPHI PS2 PU 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1102719 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11451.000 NPHI.PS2 66881.453 RTNR.PS2 -999.250 TNRA. PS2 RCNT. PS2 3764.706 RCFT. PS2 0.000 CNTC. PS2 3822.828 CFTC. PS2 GR.PS2 0.000 TENS.PS2 1421.000 CCL.PS2 -0.029 DEPT. 10554.000 NPHI.PS2 56.677 RTNR.PS2 7.651 TNRA.PS2 RCNT. PS2 2324.210 RCFT. PS2 303.797 CNTC. PS2 2244.636 CFTC. PS2 GR.PS2 29.709 TENS.PS2 1490.000 CCL.PS2 -999.250 -1056.501 0.000 8.089 291.771 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 22 **** FILE TRAILER **** FILE NA~E : EDIT .006 SERVICE · FLIC VERSION · O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AUJM~ER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11459.0 10547.0 CNTD LOG HEADER DATA DATE LOGGED: 15 -NOV- 97 SOFTWARE VERSION: 8C0- 609 TIME LOGGER ON BOTTOM: 1041 15-NOV-97 TD DRILLER (FT) : 11451.0 TD LOGGER (FT) : 11441.0 TOP LOG INTERVAL (FT) : 10555.0 BOTTOM LOG INTERVAL (FT) : 11438.0 LOGGING SPEED (FP~IR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER ........... CGRS -A CNT-D 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 23 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 11600.0 Sea Water/Methanol 68.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Correlated to Gearhart BHCS dated 6-20-86. Pumped 15 bbls Methanol, 290 bbls sea water and then another 15 bbls methanol prior to RIH. Tagged TD at 11441' THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verific'ation Listing Schlumberger Al~ska Computing Center 9-JUN-1998 17:00 PAGE: 24 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV i~IT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT .~T 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 .~U 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS3 ~S 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 ~S 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 ~?PS 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 ~PI 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 .~B 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 '7 1102719 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11459.000 NPHI.PS3 23.554 RTNR.PS3 4.000 TNRA.PS3 RCNT. PS3 4000.000 RCFT. PS3 1000.000 CNTC. PS3 4061.755 CFTC. PS3 GR.PS3 0.000 TENS.PS3 916.000 CCL.PS3 -0.019 DEPT. 10547.000 NPHI. PS3 46.573 RTNR.PS3 6.097 TNRA.PS3 RCNT. PS3 2183.299 RCFT. PS3 358.088 CNTC. PS3 2235.761 CFTC. PS3 GR.PS3 38.588 TENS.PS3 1463.000 CCL.PS3 -999.250 4.229 960,413 6.932 343.912 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-JUN-1998 17:00 PAGE: 25 **** FILE TRAILER **** FILE NAM~ : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/06/ 9 ORIGIN : FLIC TAPE NAi~E : 98266 CONTINUATION # : 1 PREVIOUS TAPE : CO~ : BP EXPLORATION, PRUDHOE BAY, G-19, API #50-029-21599-00 **** REEL TRAILER **** SERVICE NAlV~ : EDIT DATE : 98/06/ 9 ORIGIN : FLIC REEL NA~E : 98266 CONTINUATION # : PREVIOUS REEL : COMFIENT : BP EXPLORATION, PRUDHOE BAY, G-19, API #50-029-21599-00