Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
187-087
RECEIVED STATE OF ALASKA OV 2009 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORTWeittras Cons. Commission la. Well Status: Oil Gas SPLUG Plugged IN Abandoned Suspended 1b. Well Class: A SS -17 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WAG WDSPL Other No. of Completions Zero Service Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 10/29/2009 187 087 309 236 309 354 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 6612 08/28/1987 50 029 21181 90 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 09/13/1987 PBU 18 -11DPN 1278' FNL, 431' FWL, SEC. 19, T11 N, R15E, UM 8. KB (ft above MSL): 56 15. Field Pool(s): Top of Productive Horizon: 1687' FNL, 1586' FWL, SEC. 30, T11 N, R15E, UM GL (ft above MSL): 17.4' Prudhoe Bay Field Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 2332' FNL, 1727' FWL, SEC. 30, T11 N, R15E, UM 11370' 8638' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x 692199 y 5960602 Zone ASP4 11927' 8983' ADL 028321 028326 TPI: x- 693499 y- 5954944 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 693657 y- 5954304 Zone- ASP4 2187' 2187' 18. Directional Survey: Yes El No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrillLateral Top Window MD/TVD: Gyro, BHCS CNL GR, CET GR, CBT GR, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AM OUNT CASING WT. PER FT. GRADE To BOTTOM TOP I BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H 40 Surface 110' Surface 110' 30" 1900 Poleset 13 -3/8" 72# L -80 Surface 500' Surface 2500' 17 -1/2" 2400 sx CS 111.400 sx CS 11 9 -5/8" 47# L -80 Surface 11062' Surface 8437' 12 -1/4" 1000 sx Class '0', 300 sx CS II 7" 29# L -80 10763' 11927' 8233' 8983' 8 -1/2" 300 sx Class 'G' 1 24. Open to production or injection?, Yes No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD TVD) (MD +TVD of Top Bottom; Perforation Size and Number): 5-1/2" x 3-1/2", 9.3#, L -80 10804' 10704' 8192' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 41 1 1 7 rjy DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED 10739' Set Kick Off Plug w/ 50 Bbls of LARC 11370' Set Whipstock C? 1 137 L3 c►rj 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? Yes No Sidewall Core(s) Acquired? Yes No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 07/2009 CONTINUED ON REVERSE A f) I1 Sub riginal Only 1/ L3.O, 9/� 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? Yes No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Top Sadlerochit 11077' 8447' None Base Sadlerochit 11778' 8891' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre -Rig Work and Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Terrie Hubble ��tt(A,164 Title: Drilling Technologist Date: J C� /Op PBU 18 DPN 187 087 309 -236 309 -354 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. Approval No. Drilling Engineer: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 07/2009 Submit Original Only 18- 11DPN, Well History (Pre Rig Sidetrack Y� g Date Summary 8/23/2009 Move unit to drill site. Spot up on well. 8/24/2009 Continue rig up on well head. BOT on location. MU tool string. Open well. RIH with 2.13" extreme motor with 2.80" diamond speed mill. Tap to of sheath 10744'. Mill to 2.75" XN nipple 10780. Flag pipe. Mill to end of sheath 10869'. Back ream w/o any resistance. RIH dry tag btm 11750'. Paint flag 11740. Pooh. RIH w/ 2.7" Baker dummy whipstock to 11500'. Pooh. At surface, MU 2.0" BDN. RIH. Stop 10' above perforations. Conduct injectivity test. 1.0 bpm C© 400 psig. 8/25/2009 Continue displacing hole with diesel. Well taking fluid slow, 100 bbls pumped. Held PJSM with cementers and ground crew discussed current operation. Pump 50 bbls 17.0 ppo. LARC cement. Laved cement CAB 1:1 ratio from 11740' up to 9866' ctm. PUH to safety 8100 psig. Perform squeeze up to 1000 psig. Good test. Bled choke down to 500 psig. Line up to pump Biozan down coil. Pump 0.625" steel ball down coil. Ball on seat, clean down to flag 10789' ctm with biozan. Chase OOH washing all jewelry. FP well w/ 44 bbls of 50/50 meth. Trap 500 psi on well. (Est TOC 10800'1 Job Complete. 9/20/2009 T /I /O 0/250/0 Pre Nordic Torque master to tubing head adapter 930 ft lb no movement. 10/11/2009 T /I /O /350 /vac. Temp SI. No flow line, AL or well house. Unable to obtain TBG pressure. No hand rails on swab platform. IA FL surface. OA FL near surface. SV, WV C. SSV C. MV 0. 1A, OA OTG. NOVP. 10/12/2009 T /I /O= /350NAC. Temp =Sl. Bleed WHP's to 0 psi. (Eval Secure). Unable to get TP due to partial wellhead scaffold. IA FL CO 54' 3 bbl). Bled IAP from 350 psi to 80 psi in 1 hour 30 minutes, fluid to surface. Monitor for 20 minutes during rig down. No change in WHP's during monitor. Final WHP's /80Nac. SV, WV MV SSV CLOSED. IA OA OTG. 10/12/2009 T /I /O ?/90 /VAC. Temp SI. Bleed WHPs to 0 psi. (eval secure). Unable to get TP due to partial wellhead scaffold. IA FL C© 54'. Bled IAP from 90 psi to 30 psi in 30 min, Fluid to surface. SI, Monitor for 30 minutes, IAP increased 20 psi. Continue bleed. Bled IAP from 50 psi to 25 psi. Job cancelled due to pad prep for the rig. Final WHPs /25NAC. SV, WV, SSV, MV C. 1A, OA OTG. NOVP. 10/18/2009 T /I /0= SSV /80 /vac. Temp =SI. WHPs (eval secure). No Flow lines connected. SV, WV, SSV, MV C. IA, OA OTG. NOVP. 10/20/2009 T /1 /0= SSV /100NAC. Temp= SI. Bleed WHPs (pre -CTD). Wellhouse and flowline already removed. Unsafe to access wellhead, scaffolding missing rail around platform. Bled IAP from 100 psi to 0+ psi in 5 hours. Monitored for 30 minutes, IAP increased 7 psi. Final WHPs SSV/7NAC. SV/WV SSV, MV closed. 1A, OA open to gauge. NOVP. 10/23/2009 T /I /O= SSV /10Nac. Temp =Sl. Monitor WHP's (pre -CTD). IAP decreased 90 psi since 10/20/09. Note: Wellhouse F/L removed. Swab platform is incomplete, SSV requires a ladder hydraulic pump. MV closed upon arrival, left closed as per FO. SV, WV, SSV, MV =C. 1A, OA =OTG. NOVP. 10/25/2009 T /I /0= 0 /40Nac. Temp =Sl. MIT -T PASSED to 2000 psi (CTD prep). T FL near surface. Pressured Tbg to 2000 psi to test cement. TP decreased 10 psi in 1st 15 mins, 5 psi in 2nd 15 mins, for a total of 15 psi in 30 mins. Bled TP from 1985 psi to 0 psi. Note: Flowline wellhouse removed. Final T /I /0= 0 /40Nac. CTD has control of valves upon departure. Page 1 of 1 BP EXPLORATION Page 1 Operations Summary Report Legal Well Name: 18 -11 Common Well Name: 18 -11 Spud Date: Event Name: REENTER +COMPLETE Start: 10/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: 11/7/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From To Hours Task Code NPT Phase Description of Operations 10/25/2009 11:00 19:00 8.00 MOB P PRE MOVE RIG FROM DS -06 TO DS -18. 19:00 22:00 3.00 MOB N WAIT PRE RIG ACCEPT AT 19:00 WAIT ON CREW TO PERFORM MIT -T 22:00 23:00 1.00 MOB P PRE SPOT RIG OVER WELL 23:00 00:00 1.00 MOB P PRE BEGIN FLANGING UP BOP 10/26/2009 00:00 02:00 2.00 RIGU P PRE FLANGE UP BOPS, UNLOAD TRAILERS, SPOT OFFICE TRAILER. 02:00 04:00 2.00 RIGU P PRE HOOK UP SSSV PANEL. INSTALL CATCH BASIN AROUND CT RISER. SECURE STACK LATERALLY IN CELLAR. INSTALL AND PRESSURE TEST LINE TO FLOWBACK TANK. 04:00 05:00 1.00 BOPSUF P PRE GREASE TREE, FRFP FOR BOP TEST 05:00 06:30 1.50 BOPSUF N RREP PRE INSPECT BOP BLIND RAM HYDRAULIC HOSE THAT HAS DAMAGED FIRE INSULATION. CONDUCT PJSM AND LO/TO OF KOOMEY UNIT. 06:30 15:35 9.08 BOPSUF P PRE START BOP TEST. AOGCC WITNESS WAIVED BY JOHN CRISP. 2 -3/8" COMBI, 2" UPPER AND LOWER COMBIS ALL TEST OK DIFFICULTY TESTING THE BLIND RAMS AND ANNULAR PREVENTER 15:35 16:35 1.00 BOPSUF N RREP PRE CHANGE OUT BLIND RAMS 16:35 18:30 1.92 BOPSUF N RREP PRE CONTINUE TESTING BOPE. 18:30 19:30 1.00 BOPSUF P PRE PICK UP INJECTOR AND PUMP DIESEL OUT FROM LAST WELL. 19:30 20:00 0.50 BOPSUF P PRE TEST INNER REEL VALVE, GOOD. BLEED OFF PRESSURE. 20:00 22:00 2.00 WHIP P WEXIT NORDIC CREW CHANGE. M/U INJECTOR TO WELL, PREP TO PUMP SLACK BACKWARDS. PUMP BACKWARDS 3.0 BPM 4400 PSI. OPEN CT RISER AND HOOK UP HYDRAULIC CUTTER. CUT 324 FT OF CT TO FIND CABLE. 22:00 23:30 1.50 WHIP P WEXIT UNHOOK HYDRAULIC CUTTER. INSTALL CT CONNECTOR, PULL TEST TO 35K GOOD. TEST CABLE THEN INSTALL BHI CABLE HEAD. PT TO 3800 PSI, GOOD. 23:30 00:00 0.50 WHIP P WEXIT TAKE FARR TONGS OUT OF STABBING BOX AND FUNCTION TEST, THEY WERE ACTING UP ON THE LAST WELL. NO PROBLEMS FOUND, PUT THEM BACK IN THE BOX. 10/27/2009 00:00 01:00 1.00 STWHIP P WEXIT PICK UP BHA #1 2.80 MILL, 0.9 DEG XTREME, 2 -3/8" COILTRAK. MILL IS 2.80 NO -GO 2.81 GO. BHA OAL 58.35 FT. 01:00 03:30 2.50 STWHIP P WEXIT RIH BHA #1. 03:30 04:15 0.75 STWHIP P WEXIT LOG GR TIE -IN FROM 10600 FT. CORRECT +10 FT. 04:15 18:00 13.75 STWHIP P WEXIT TAG AT 10739 FT. T6C MILL CEMENT INTIAL ROP IS 39 FT /HR WITH 0.3 KLBS DWOB. HOLD 20R TF. 10750 FT, 24 FT /HR, 2.4 KLBS DWOB 10780 FT, 30 FT /HR, 2.2 KLBS 10800 FT, 20 FT /HR, 2.1 KLBS Printed: 11/19/2009 11:25:13 AM BP EXPLORATION Page 2 15P19 Operations Summary Report Legal Well Name: 18 -11 Common Well Name: 18 -11 Spud Date: Event Name: REENTER +COMPLETE Start: 10/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: 11/7/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From To Hours Task Code NPT Phase Description of Operations 10/27/2009 04:15 18:00 13.75 STWHIP P WEXIT 10825 FT, 18 FT /HR, 1.5 KLBS 10850 FT, 25 FT /HR, 2.0 KLBS 10875 FT, 26 FT /HR, 1.9 KLBS 10925 FT, 23 FT /HR, 1.8 KLBS 10950 FT, 23 FT /HR, 1.9 KLBS STALL AT 10986. 18:00 18:40 0.67 STWHIP P WEXIT 10990 FT, 18 FT /HR, 1.70 KLBS MILL TO 11000 FT. 18:40 19:00 0.33 STWHIP P WEXIT WIPER TRIP TO 10750 FT. CLEAN PASS UP AND DOWN. 19:00 00:00 5.00 STWHIP P WEXIT MILL CEMENT FROM 11,000 FT. 4 STALLS AT 11,005 FT. DRILL 2 FT AT 90R TF TO GET PAST, THEN GO BACK TO 20R ADD 150 BBLS RECONDITIONED MUD TO SYSTEM AFTER 21:00. 11010 FT, 25 FT /HR, 2.2 KLBS 20R TF 11040 FT, 30 FT /HR, 2.2 KLBS STALL HERE. 11070 FT, 25 FT /HR, 2.1 KLBS 11100 FT, 30 FT /HR, 2.6 KLBS PULL 300 FT WIPER AT 11,100. DRILL TO 11,118. 10/28/2009 00:00 04:50 4.83 STWHIP P WEXIT CONTINUE MILLING FROM 11118 FT. 11145 FT, 31 FT /HR, 2.51 KLBS DWOB 11180 FT, 31 FT /HR, 2.35 KLBS 11230 FT, 29 FT /HR, 2.3 KLBS MILL TO 11,250 FT. 04:50 05:20 0.50 STWHIP P WEXIT WIPER TRIP FROM 11250 FT TO 11750 FT. 05:20 13:45 8.42 STWHIP P WEXIT MILL FROM 11250 FT, 29 FT /HR, 2.6 KLBS DWOB. 11350 FT, 25 FT /HR, 1.9 KLBS DWOB. 11400 FT, 24 FT /HR, 1.4 KLBS DWOB Mill to 11425 13:45 14:00 0.25 STWHIP P WEXIT PU to 11080 LOG TIE IN. WHILE CIRCULATING SWEEP TO MILL. CORRECTION +3'. 14:00 14:30 0.50 STWHIP P WEXIT CIRCULATE SWEEP TO MILL. 14:30 15:00 0.50 STWHIP P WEXIT POH 10815 15:00 16:45 1.75 STWHIP P WEXIT BACKREAM FROM 10815 TO 10780 WITH TF 200R.@ 1 FT /MIN. RIH TO 10820.5 FT /MIN. BACKREAM 1FT /MIN 16:45 19:20 2.58 STWHIP P WEXIT POH. 19:20 21:00 1.67 STWHIP P WEXIT STOP AT 500 FT AND CIRCULATE. RIG LEADERSHIP TEAM ATTENDS ROLLOUT OF CONTINUOUS IMPROVEMENT SOFTWARE. 21:00 21:15 0.25 STWHIP P WEXIT SAFETY MEETING. PJSM FOR UD BHA #1 AND P/U DUMMY WHIPSTOCK. POOH AND TAG STRIPPER. 21:15 22:20 1.08 STWHIP P WEXIT UD BHA #1. MILL IS 2.78 NO -GO, 2.79 GO. M/U BHA #2, TEST TOOL AT SURFACE. 22:20 00:00 1.67 STWHIP P WEXIT OPEN EDC AND RIH. 10/29/2009 00:00 00:25 0.42 STWHIP P WEXIT CONTINUE RIH. SLOW DOWN THROUGH TUBING TAIL AREA, VERY SMALL WT CHANGES SEEN HERE <2K). 00:25 01:00 0.58 STWHIP P WEXIT LOG GR TIE -IN FROM 11,090 FT. CORRECT +44 FT. 01:00 02:50 1.83 STWHIP P WEXIT RIH AND TAG BOTTOM 11423 FT, 2 TIMES. POOH, LOG CCL ACROSS TUBING TAIL, XN AND 7" LINER TOP ON THE WAY OUT. 02:50 03:30 0.67 STWHIP P WEXIT OUT MM READING HIGH, STOP CT AND PUMP, FLOW Printed: 11/19/2009 11:25:13 AM BP EXPLORATION Page 3 obi Operations Summary Report Legal Well Name: 18 -11 Common Well Name: 18 -11 Spud Date: Event Name: REENTER +COMPLETE Start: 10/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: 11/7/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From To Hours Task Code NPT Phase Description of Operations 10/29/2009 02:50 03:30 0.67 STWHIP P WEXIT CHECK WELL. NO FLOW, SHOWING 0.07 ON OUT MM. BACKFLUSH MM, CONTINUE POOH. 03:30 03:50 0.33 STWHIP P WEXIT SAFETY MEETING. STOP AT 500 FT AND CLOSE EDC, PJSM. 03:50 04:45 0.92 STWHIP P WEXIT TAG STRIPPER, UD BHA #2. M/U BHA #3 WHIPSTOCK, MODEL J SETTING TOOL, AND 2 -3/8" COILTRAK. CHANGE OUT SLB COUNTER ASSEMBLY. 04:45 04:55 0.17 STWHIP P WEXIT RIH BHA #3. 04:55 05:40 0.75 STWHIP N SFAL WEXIT COUNTER WHEEL NOT TURNING. POOH AND TAG STRIPPER, REPAIR COUNTER. 05:40 07:45 2.08 STWHIP P WEXIT RIH TO 11085 07:45 08:20 0.58 STWHIP P WEXIT LOG TIE IN CORRECTION 38. 08:20 10:30 2.17 STWHIP P WEXIT RELOG 10629 11078'. 10639 correction 1.5,11037 correction +5,11078 correction +4 10:30 10:45 0.25 STWHIP P WEXIT RIH TO SETTING DEPTH 11370 TOP WS. MECHANICAL COUNTER VERSIS DIGITAL 1 FT DIFFERENCE 10:45 11:00 0.25 STWHIP P WEXIT WS TRAY FACE HS CLOSE EDC. PRESSURE TO 3900 PSI. STACK 3K. PU WT 32K. 11:00 12:45 1.75 STWHIP P WEXIT POH WITH WS SETTING BHA. 12:45 14:00 1.25 STWHIP P WEXIT LD WS SETTING TOOLS. MU BUILDING BHA. 14:00 16:10 2.17 STWHIP P WEXIT RIH to 11050 16:10 16:45 0.58 STWHIP P WEXIT LOG TIE IN CORRECTION +31. e W 16:45 17:50 1.08 STWHIP P WEXIT MILLING OD 1.59 1.64 BPM AT 3360 PSI r 17:50 18:10 0.33 STWHIP N SFAL WEXIT STOP MILLING AT 11370.30 FT, BHI COMPUTER PROBLEMS. 18:10 00:00 5.83 STWHIP P WEXIT CONTINUE MILLING, OL TF. ESTIMATED TOW IS 11370.00 FT. 20:00 11371.90 FT 0.38K DWOB 3460 PSI 21:00 11372.80 FT 1.42K 3550 PSI START TAKING SLIGHT FLUID LOSSES AT THIS DEPTH. 22:00 11373.50 FT 1.73K 22:40 11374.10 FT 1.46K LOSSES INCREASE AT 11374 FT, 1.57 0.96 BPM. 00:00 11375.10 FT 1.00K 1.57 0.94 BPM 10/30/2009 00:00 02:10 2.17 STWHIP P WEXIT CONTINUE MILLING WINDOW. 00:00 11375.10 FT 1.00K 1.57 0.94 BPM 01:00 11375.80 FT 1.53K 1.55 0.88 BPM 02:00 11376.80 FT 1.56 1.16 BPM 1.76K DWOB 02:10 05:25 3.25 STWHIP P WEXIT STALL AT 11376.8 FT. UP WT IS 34 KLBS. FREESPIN IS 3200 PSI 1.53 1.19 BPM 03:00 11377.00 FT 1.51 1.13 BPM 0.98K 04:20 11381.70 FT 1.51 /0.75BPM 2.15K SAMPLE FROM 11380 FT HAS FORMATION. 05:00 11383.56 FT 1.50 0.32 BPM 1.35 BPM DRILL TO END OF RATHOLE AT 11385 FT. 05:25 06:00 0.58 STWHIP P WEXIT REAM WINDOW UP AND DOWN 2 TIMES. 06:00 06:20 0.33 STWHIP P WEXIT DRY RUN THROUGH WINDOW IS CLEAN, BOTH WAYS. 06:20 08:00 1.67 STWHIP P WEXIT POH 08:00 08:30 0.50 STWHIP P WEXIT LD MILLING BHA.MILL 2.73 GO 2.72 NOGO. 08:30 09:15 0.75 STWHIP P WEXIT PU SWIZZLE STICK AND FLUSH BOP STACK. 09:15 10:25 1.17 STWHIP P PROD1 MU DRILLING BHA. 10:25 12:25 2.00 STWHIP P PROD1 RIH TO 11030' r 1 Pr Printed: 11/19/2009 11:25:13 AM TREE= McEVOY GEN 3 SAFETY NOTES: 18-11A CTD DEPTHS ARE WELLHEAD McEVOY 18-11A ELMD. ACTUATOR AXELSON ORIG KB. ELEV 55' ORIG BF. ELEV ORIG KOP 3150' Max Angle 89° 12245' D R A FT 43' I 1/2" X 3 -1/2" X0 Datum MD 12609' �f DRAFT 1 Datum ND 8800 SS 218T 1 OTIS FMX TRSV, ID 2.813" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8" CSG, 72 L -80, ID 12.347" 1 1 2462' 1 3230 3226 13 MMG DOME RK 16 11/08/09 2 7056 5933 54 MMG SO RK 20 11/08/09 Minimum ID =1.82" 10672' 3 9555 7558 50 MMG DMY RK 0 03/01/07 2 -3/8" LINER TOP PACKER CHEMICAL MANDRELS iiiir ST MD I TVD DEV TYPE I VLV I LATCH' PORTI DATE 4 10582 8226 47 KBUGLTS1 CHEM BK 10672' —12-3/8" BKR KB LT PKR, ID 1.82" TOP OF CMT SHEATH/COLLAR, 10703' MILLED ID= 2.8" (08/25/09) 10700' 1 X 3 -1/2" BAKER DB PERM PKR I ip 10710' H3 -1/2" DEPLOYMENT SLEEVE, ID 1.875" I I I TOP OF 7" LNR IH 10763' t'i► i 10791' I 3 -1/2" OTIS XN NO-GO NIP, j!j MILLED ID 2.8" (08/25/09) I �i I 1 0 3-1/2" TBG-PC, 9.3 L-80, .0087 bpf, ID 2.992" 1-1 10803' 1 10803' H 3 -1/2" TUBING TAIL CMrD BEHIND PIPE ►v 01 I 10799' I 1 ELMD TT LOGGED 03/08/91 1 i ►.1 1 9 -5/8" CSG, 47 L -80, ID 8.681" I--I 11062' I-A r; 0. ■r 1 0 1 *1 MILLOUT WINDOW (18 -11A) 11370' 11375' 0 1 �1 17" LNR, 29 L -80, ID 6.276" H 11370' I PERFORATION SUMMARY REF LOG: MCNL /SCMT 11/06/09 ANGLE AT TOP PERF: 67° 12530' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE I PBTD H 12718' 1 1.56" 6 12530 12590 0 11/06/09 w�� 1.56" 6 12650 -12695 0 11/06/09 12-3/8" LNR, 4.7 L -80, .0039bpf, ID 1.92" H 12749' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/17/84 RWN41 ORIGINAL COMPLETION WELL: 18 -11A 09/26/90 AUDI 4 RWO PERMR No: 2090740 11/07/09 NORDICI CTD SIDETRACK (18 -1IA) AR No: 50- 029 21181 -01 11/08/09 GTW /SV GLV C/CO SEC 19, T11 N, R15E, 3251.99' FEL 2329.92' FNL BP Exploration (Alaska) • • ~~~ ~ F~ ~ k ~+ ` ~ ~ ~;~ h~ ~~ ~ " ~ ~1 ~ 7 7~ F ~ 8 ~~ ~ Sl+~ ~ ~1 ~ ~~ r ~ f ~ G~-~ ~~F ~~ P~~ ~_. ~~ F ~3 °~' ~ N ~,~ ~ ¢ ~ ~ ~, ~ p ~, ~ ~ ~ ~ ~, i~ ' ~ ~ ~ SEAN PARNELL, GOVERNOR ~~~ ' ~ i ~ `~ ~, ~.~~ ~ ~? ~~,~~ ~ ~#~~ a ~ ~~~ ~ ~~ ~ ~ ~~~~ ~~~~ i ~1r ~~+ ~x~~ tL,tt~-7~~ ~IL ~~ 17~~7 ~~ 333 W. 7th AVENUE, SUITE 100 COI~TSERQATIOI~T COrII~IISSIOI~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 tf FAX (907) 276-7542 Ms. Terrie Hubble Drilling Technologist BP Exploration (Alaska), Inc. ~~ P.O. Box 196612 ~(~~ ~ Anchoragc, AK ~~51~-6612 ,~..,...... _..~ .~~...,._ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-11 DPN Sundry Number: 309-354 ~~~~~~~ ~~C~'~v~ ~ c~ 2~1~~ Dear Ms. Hubble: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Cominission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the ne~ working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair ~ DATED thi~~ day of October, 2009 Encl. ' , ~ -6~ STATE OF ALASKA ~~~~ ALASI~IL AND GAS CONSERVATION COMMI~N •ti APPLICATION FOR SUNDRY APPROVAL . ~o 20 AAC 25.280 ~~~~iv~c~e~ ocT ~ o zoo~ ~1~'es4w flil 4. f?wa. f~w.~.. f~.~. 1. Type of Request Ac ha faQB A ' ^ Abandon ^ Suspend ^ Operational Shutdown ^ Perforate ^ Re-EnterSuspended We If ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ~ Other Specify: ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Time E~ension Re-Name from PBU 18-11 D 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Development ^ Exploratory 187-087 - 3. Address: ^ ServiCe ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21181-90-00 - 7. If pertorating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: ~~.~ _.~--.,-•-...... -... property line where ownership or landownership changes: pBU 18-11 DPN wU/N ~€ Spacing Exception Required? ^ Yes ~ No 9. Property Designation: 10. Field / Pool(s): ~ ',~.~Z ADL 028321 & 028326 ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool ~~• PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): EffeCtive Depth TVD (ft): Plugs (measured): Junk (measured): 11927' . 8983' ~ 11886' ' 8958' ' None None Casin Len th Size MD ND Burst Colla e Structural Conductor 11 ' 2" 11 ' 1' 14 7 Surface 2500' 1-/8" 2 00' 2 0' 493 2670 Intermediate 11 2' -/" 11 2' 8437' 70 4760 Production lirter 11 4' 7" 1076 '- 11927' 8233' - 8 3' 8160 7020 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11680' - 11730' 8830' - 8861' 5-1/2" x 3-1/2", 9.3# L-80 10804' Packers and SSSV Type: 9-5/8" x 3-1/2" Baker DS packer Packers and SSSV 10704' / 8192' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ~ Description Summary of Proposal ^ BOP Sketch ^ Exploratory ~ Development ^ Service ^ Detailed Operations Program 14. Estimated Daie for 15. Well Status after proposed work: Commencing Operations: AS Soon As Approved ~ Oil ^ Gas ^ WDSPL ^ GSTOR ^ Abandoned 16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Terrie Hubble Title Drilling Technologist ~ ~ O Prepared By Name/Number. 9 ~ ~~ Si natu~e Phone 564-4628 Date Terrie Hubble, 564-4628 Commission Use Onl Conditions of approval: Notify Commission so that a representative may witness a~ ' 2 Sundry Number: ~/ ~ ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: Subsequent Form Required: APPROVED BY ~ 2 f Approved By: COMMISSIONER THE COMMISSION Date F~ 10~ e o 0_ 7/2~0 `, Submit In Duplicate ~~~, ~ ~ ~ ~i%~,~~ _ ~ ~ `7Z,~ ~~~~C~~AL ,~ ~ bp Terrie Hubble Drilling Technologist Drilling & Welis October 16, 2009 • • .~~~,~. ~~~~~,,.~~ ~~: :~i i~~~~~~~~ BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-51 1 1 Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Fieference: API # 50-029-21181-90-00 Permit # 187-087, PBU 18-11 D(for Deepen) Direct: (907) 564-4628 Terrie.hubble~bp.com Mr. Tom Maunder: The operator respectfully requests that the following well within the Prudhoe Bay Unit be re-named as follows: Current Name New Name Permit # API # PBU 18-11 D 18-11 DPN 187-087 50-029-21181-90-00 Well PBU 18-11 (PTD # 184-156) was originally drilled in 1984 to a depth of 4509'. In 1987 the well was deepened to 11927' under the well name of PBU 18-11 D. CTD is preparing to sidetrack from this wellbore with new well name PBU 18-11A. Since it is entirely possible that at some point in the future we may actually wish to sidetrack again, it seems that we should bring the PBU 18-11 D well in line and change the name so that it will be a little less confusing. Thank you very much for your assistance in this matter. Sincerely, Terrie Hubble ~~l~ ~. ~~!~:~~$~. Distribution Well Files PDC- Partner Distribution 1 RQ ~- IV6iCY V 1 VGI\ J W~LHEAD = McEVOY ACTUAT0~2 = AX~SON KB. ELEV = 55' BF.'~EV = ? KOP = 3150' Max Angle = 51 (a3 11800' Datum MD = 11720' Datum ND = 8800' SS 13-3/8" CSG, 72#, L-80, ID =12.347" ~ ~ ~' ~ ~ ~T iv L 19-~g ., . ,...,. .. ~.._ . .._. ..,,..._ . ... .___. ~ (FORAAERLY MAMED: 19-11-15j 43' J-~ 5-1I2" X 3-1/2" XOJ 2187' 3-1l2" OTIS FNDC TRSV, ID = 2.813" GAS LIFT MAI~RELS Minimum ID = 2.680" @ 10703' CMT SHEAT/C~R (10703-10862) TOP OF 7" LNR 10763' ~ 3-1/2° TBG-PC, 9.3#, L-80, .0087 bpf, ID = 2.992" ~-~ 10803' 9-5/8" CSG, 47#, L-80, ID = 8.681" ~-~ 11 PERFORATION SUNI~MRY R~ LOG: CNL ON 02/28/89 ANGLEATTOPPERF:52~ 91&46' Note: Refer to Production DB for historical perf data SQE SPF INTB~VAL Opn/Sqz DATE 2-1/8" 1/2 11646 - 11656 S 10/14/88 2-1/S" 4 11662- 11672 S 10/14/88 2-1/8" 4 11662 - 11672 S 08/26l98 2-1/8" 4 11664 - 11674 S 08/26/98 2-1/8" 6 11680 - 11690 O 06/20/99 2-1/8° 4 11684-11704 S 10/14/88 2-1/8" 4 11684 -11704 S 10/14l88 2-1/8' 4 11686 -11706 S 08/26198 2-1/8" 6 11690- 11T10 O 11/21/98 2-1/8" 6 11696 - 11706 S 08/26/98 2-1/8" 6 11710-11730 O 06l20l99 2-1/8° 6 11710 - 11740 S 10/14/88 2-1/8" 6 11712 - 11732 S 08/26/98 2-1l8" 6 11750-11T56 S 10/14/88 2-1/8" 6 11760 - 11774 S 10/14/88 Pgm 11886' 7° LNR, 29#, L-80, .0371 bpf, iD = 6.184° 11927' ST IVm ND DEV TYPE VtV LATCH PORT QATE 1 3230 3226 13 N1MG a1AY RK 0 03/01/07 2 7056 5933 54 N~AG DMY RK 0 03101/O7 3 9555 7558 50 1V~ DAAY t~K 0 03/07/07 C~AL MANUFitLS ~ 9-5/8" X 3-1/2° BAKB2 DB P62M PKR ~ TOP OF CMT SHFATWCOLLAR ~= 2•s$" 10703-10862 FROM Ll~ LAP SClZ 11/25/95 3-1/2" OTIS XN NO-GO NIP, ID = 2.75" I 10802' ~- j 3-112" BA-cER SOLID t~SE SF~AftouT SUB 10803~ 3-1/2" TUBWG TAR. ~Q7J9' -~N~ TT LOGG~ 03l08/91 1{- p$~' ~ BOTTOM OF CMT SHEATH DATE REV BY COMMEMS DATE REV BY CONNAINTS 09/17184 OWGINALCOMPLEf10N 03/16/06 RPWTLH WAN~2SAFEf1'NOTE 09f26/90 RWO 02/09/07 DPS/PJC WRP PULL~ 03lO6106 07/25/03 09M 3/03 JRGKK CMO/TLP WAN92SAFETY NOTE DATUM MD & PBZFSlANGLE 03/01/07 05/09/07 NtGSRLH RDW/PJC GtV GO WAN62 SFTY NOTE D9.ET~ OS/14/05 KSB/TLH GLV CJO 02/07/06 TBJPJC WRP @ 10600' PRUDHOE BAY UNIT WB..L: 18-11 DPN P~tMff I~lo: ~1.8+44668 ~~~' C~ APo No: 50.029-21181 A0 SEC 19, T11 N, R15E, 3251.99' F~ & 2329.92' FNL BP Fxploration (Alaska) ~ . - ~ ~~ ~~~ ~ ~~~~~ ~ ~ ~~~~~ ~~- ~ ~~ ~ ~ ~ d~ , ~ SARAH PALIN, GOVERNOR ~ ~~ ~ ~ ~~ ~ !~ ~~ ~ ~ ~ Mr. John McMullen Engineering Team Leader BP E~loration (Alaska), Inc. P.O. Box 196612 ~ - 1'j Anchorage, AK 99516-6612 ~~ ~ `' ~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU-18-11 DPN Sundry Number: 309-236 U~,,:~~~~i~~ ~li? ~ ~ ~~~?~ Dear Mr. McMullen: Enclosed is the approved Application for Sundry A,pproval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When provicling notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may ffie with the Commission an application for rehearing. A request for rehearing is considerecl timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the ne~ct worl~ng day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~ Chair DATED this ~ 7 day of July, 2009 Encl. ,0~ ~ \~ ~ STATE OF ALASKA ALA~OIL AND GAS CONSERVATION COMN~ION N APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 ~'~IS C~ ~ /..''c~ 1. Type of Request: ~ Abandon , ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ^ Aiter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Development ^ Exploratory 187-087 -. 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21181-90-00 - 7. If perForating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 18-11 DPN - Spacing Exception Required? ^ Yes ~ No 9. Property Designation: 10. KB Elevation (ft): 11. Field / Pool(s): ~ ADL 028321 & 028326 - 55' ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool 12• ' PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11927' - 8983' - 11886' 8958' None None in L n h iz MD TVD Bur t Coll ru tural onu or 110' 2" 11' 11' 14 47 SurFace 2500' 1-3/8" 2500' 2 49 67 In erm i 11 2' -/" 11062' 8437' 6870 476 Pr i n Liner 1164' 7" 10763' - 11927' 8233' - 98 ' 8160 702 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11680' - 11730' 8830' - 8861' 5-1/2" x 3-1/2", 9.3# L-80 10804' Packers and SSSV Type: 9-5/8" x 3-1/2" Baker DB packer Packers and SSSV MD (ft): 10704' 13. Attachments: 14. Well Class after proposed work: ~ Description Summary of Proposal ^ BOP Sketch ^ Exploratory ~ Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: August 1, 2009 ^ Oil ^ Gas ^ Plugged ~ Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that e for~oing i rue and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387 Printed Name J n M r t ` Title Engineering Team Leader Prepared By Name/Number: SignatuFe ,. '' Phone 564-4711 Date ~ Q~ y Terrie Hubble, 564-4628 ' Commission Use Onl ~+~ \ -0 Sundry Number: Q _ 3~ Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ~BOP Test ^ Mechanical Integrity Test ^ Location Clearance ~S~~Ps~ c~ o-~~S-~t- ~35`~Oes~ +~.\ a~'1 a-~. v v--Lei.~~~-~~~ Oth er. Subsequent Form Required: ~ ~ APPROVED BY ~ J/~ / / A r~ve~ ~: C~MMISS-~NER THE COMMISSION Date ~ Form 10-403 Revised 06/2006 0RIGINAL ~~~~;.,~~ ~~~~~9 Submit In Duplicate • • To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission h~ From: Sean McLaughlin (564-4387) ~J CTD Engineer Date: July 9, 2009 Re: 18-11 Sundry request for plugging perforations WELL HISTORY: 18-11 DPN was sidetracked in April 1988 as Ds-18 Z1 B vertical Graben producer. The May 1988 PPROF showed all the flow to be coming from the top two sets of perfs. The October 1988 mud acid stimulation & re-perfs had no effect on production. The well was fraced in October 1990 with 3400 Ibs of proppant placed inside the formation. The frac job did not bring in any benefits. The 05/15/90 STP showed cooling at the LTP (leaky packer). Subsequently, a 2" LTP straddle was set on 05/23/95 and unfortunately seemed to shut off all production. The straddle was pulled and the liner lap squeezed in November 1995. The squeeze left the TOC Q~ 10,730' md. The well was BOL post the LTP squeeze in early 1996 and came back with much better rates and produced fulltime for over a year. The well was already cycling by late 1998. Therefore, a GSO squeeze was pumped on 11/21/1998. This was followed by 20' of re-perfs in April 1999. The well was able to come online post the re-perfs and stayed on (cyclying) until April 2000 when it ceased producing any fluids. The 10/21/00 SL drift tagged 38' of fill C~ 11,742' slm. A CT FCO was performed on 11/08/00. The well was POP post the FCO and then went to high GOR within a couple of months. The well stayed as a cycle well in LP (with pretty good recharge abitity after SI periods) for the next 6 years. However, all ensuing attempts to flow this well post February 2007 have been unsuccessful. The most recent attempt was in June 2008, the well could not come alive in LP, even after being SI for close to 1.5 years and back flowing on it several times. The 08/10/07 SBHP survey found a BHP of 3,304 psi and BHT of 188 degF f~ 8,800`ss. 18-11 DPN is in sound mechanical condition. The May 2009 caliper found the 5-1/2" x 3-1/2" TBG to be in good condition with no significant wall penetration or cross-sectional wall loss. The well passed the MITOA to 2000 and the MITIA to 3000 psi on 5/20/09. REASON FOR SIDETRACK: The well has been SI for HIGOR for the last 2+ years. All attempts to flow the well in LP have been unsuccessful and there are no good wellwork options left. A CST is the only reasonable option left to make this well viable. The proposed plan for 18-11 is to drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around September 1. 2009. The existing perforations wifl be isolated by a cement plug in the 7" liner. The sidetrack, 18-11A, will exit the existing 7" liner off a mechanical whipstock. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. ~~ ~ ~~~ , ,~ ~,j GGV ~j /:~ t; n~ ~Oc iAfO//~'r~ y C/d! G U/' . .l TG j~ic'-~/ W~ 1' ~ 7t~yr+ ~ G f / ~r 2?~'ff~%~ a•~f tf/.!~ "~~ ..~.- ~,'~C traG~ w.'~J 7~,r~~r t~~' ~'u~ e~'~-~ r T~'~r ~~ ~s~ r~ !>~~i c~'/n~~ Y r~ ~s~ ,~ ~~'D d/ C~'^~ ~rd~-. 14er~Fr~i~ ~ ~r'rr~r ~~~~ k''f''i 1 rv G~vic eq0 ~~~i1' (.~fh /~D l~~'!r'v './r ~ ~a~ r~e c~er.%~ ~n~ ~en,a<r,~~ ~~S~~~ty ~~,~ ~ ~~t ~;,i ~renl- tn.e~~ ~~2 lo~t,Dn, ~l ~~l ~ • Pre-Rig Work: The pre CTD work is slated to begin on August 1, 2009. 1. S Dummy GLV's and chemical injection mandrel 2. W MIT-IA to 3000 psi 3. C Mill cement sheath to 2.74" (use mill and string reamer) 4. C Dummy whipstock drift to 11,500' 5. C MGR/CCL for depth control, tag PBTD 6. C Lay in 17# kick off plug from PBTD, wash down to the tubing tail (50 bbl of cement) !~ 30~,~~CC~ 7. W AC-LDS; AC-PPPOT-T ?r,,t 8. W PT tree (MV,SV,WV) 9. O Bleed gas lift and production flowlines down to zero and blind flange 10. O Remove S-Riser, Remove welthouse, level pad ~'1 \~ G~~~~` ~ ~ri Rig Work: Spud ~ September 1, 2009 1. MIRU and test BOPE to 250 psi low and 3500 psi high 2. Drill 2.74" pilot hole in cement to 11,425' 3. Run dummy whipstock drift 4 Set whipstock hiqhside at 11400' 5. Mill 2.74" window and 10' of openhole. Swap the well to Geo-VIS 6. Drill Lateral: 3" OH, 1343' horizontal (15 deg/100 planned) 7. Run 2 3/8" solid liner leaving TOL at 10,750' 8. Pump primary cement job, leaving cmt 50' below the window (6 bbls of cement) 9. Run CO assembly 10. Run MCNUGR/CCL log 11. Test liner lap to 2000 psi. 12. Perforate, planned 150ft 13. If needed set Liner top packer 14. Freeze protect well, Set BPV, RDMO Post-Rig Work 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run gas lift design and chem injection mandrel 4. POP Well (no test separator -(150' of planned perfs) Sean Mclaughlin CTD Engineer 564-4387 CC: Well File Sondra Stewman/Terrie Hubble ~ ~TR~ = McEVOY GEN 3 WElLHE~D = McEVOY ACTUATOR = AXELSON KB. ELEV = 55' BF. E1EV = ? KOP = 3150' Max Angle = 51 @ 11800' Datum MD = 11720" Datum N D= 8800' SS 1 V-11 ~~ N SAFETYS OTES: W ELL PREVIOUSLY CALLm ~ (FORMERLY NAMED: 19-11-15) 13-3/8" CSG, 72#, L-S0, ID = 12.347" 2462' Minimum ID = 2.680" @ 10703' CMT SHEAT/CLR (10703-10862) TOP OF 7" LNR 10763~ ~~ 3-1/2" TBG-PC, 9.3#, L-80, .0087 bpf, ID = 2.992" ~~ 10803~ 9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 11 PERFORATION SUMMARY REF LOG: CNL ON 02/28/89 ANGLE AT TOP PEFiF: 52 @ 11646' Note: Refer to Production DB for historical pert data SIZE SPF INT6~VAL Opn/Sqz DATE 2-1/8" 1/2 11646 - 11656 S 10/14/88 2-1/S" 4 11662 - 11672 S 10/14/88 2-1/8" 4 11662 - 11672 S 08/26/98 2-1/8" 4 11664-11674 S 08/26/98 2-1/8" 6 11680 - 11690 O O6/20/99 2-1/8" 4 11684 - 11704 S 10/14/88 2-1/8" 4 11684 - 11704 S 10/14/88 2-1/8" 4 11686-11706 S 08/26/98 2-1 /8" 6 11690 - 11710 O 11 /21 /98 2-1/8" 6 11696 - 11706 S 08/26/98 2-1/8" 6 11710 - 11730 O O6/20/99 2-1/8" 6 11710 - 11740 S 10/14/88 2-1/8" 6 11712-11732 S 08/26/98 2-1/8" 6 11750 - 11756 S 10/14/88 2-1/8" 6 11760 - 11774 S 10/14/88 PBTD -j 11886, 7" LNR 29#, L-80, .0371 bpf, ID = 6.184" 11927' 43' ~5-1/2" X 3-1/2" XO ~ 2187' 3-1/2" OTIS FMX TRSV, ID = 2.813" GAS LIFf MANDREIS ~ ST MD ND DEV TYPE VLV LATCH PORT DATE 1 3230 3226 13 MMG DMY RK 0 03/01 /07 2 3 7056 9555 5933 7558 54 50 MMG MMG DMY DMY RK RK 0 0 03/01/07 03/01/07 CHBNICAL MANDRELS c ST NID TVD DEV TYPE VLV LATCH PORT DATE 4 10582 8226 47 KBUGLTS CHE]1A BK 10700' 9-5/8" X 3-1/2" BAKER ~ PERM PKR 10703' TOP OF CMT SHEATH/COLLAR, ID = 2.68" 10703-10862 FROM LNR LAP SQZ 11/25/95 10791' 3-1/2" OTIS XN NO-GO NIP, ID = 2.75" 1~802' 3-1/2" BAKER SOLID NOSE SHEAROUT SUB 1/2" TUBING TAIL 10803~ 3 - 10799' ~MD TT LOGGm 03/08/91 10862~ BOTTOM OF CMf SHEATH DATE REV BY CAMMENTS DATE REV BY CONtl~ABVTS 09/17/84 ORIGINAL COMPLETION 03/16/O6 RPWTLH WAN~t SAFETY NOTE 09/26/90 RWO 02/09/07 DPS/PJC WRP PULL~ 03/O6/06 07/25/03 JRGKK WAIVERSAFETY NOTE 03/01/07 NIGS/TLH GLV CJO 09/13/03 CMO/TLP DATUM MD & PERFS/ANGLE 05/09/07 RDW/PJC WAIVB~ SFTY NOTE D~ETED 08/14/05 KSB/TLH GLV GO 02/07/06 T~/PJC WRP @ 10600' PRUDHOE BAY UNff WELL: 18-19 DPN ..e PERMff No: ~~48~4~bG9 t97~ vv~ A PI No: 50-029-21181 ~ SEC 19, T11 N, R15E, 3251.99' FEL & 2329.92' FNl BP Exploration (Alaska) TREE = McEVOY GEN 3 WEl. F_'AD = McEVOY ACTUATOR= AXEISON KB. ELEV = 55' BF. E1EV = ? KOP = 3150' Max Angle = 51 @ 11800' Datum MD = 11720' Datum ND = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" 1 V-11 A SAFETYS OTES: WELL PREVIOUSLY CALLm ~ Proposed CTD Sidetrack I ~ I Minimum ID =1.75" @ 10680' TOP OF 2-3/8" LNR-CT ~ 10750~ TOPOF 7" LNR 1Q7~' 43~~ 5-1/2" X 3-1/2" XO ~ 187~ 3-1/2" OTIS FMX TRSV, ID = 2.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 1 3230 3226 13 MNIG DMY RK 0 03/01l07 2 7056 5933 54 MMG DMY RK 0 03/01/07 3 9555 7558 50 MMG DMY RK 0 03/01/07 GHEMIGAL MANDREIS ST MD ND DEV TYPE V~V LATCH PORT DATE 4 10582 8226 47 KBUGLTS CHEM BK 106R0' 3-1/2" Baker KB LTP ID = 1.75" 10700• ~-19-5/8" X 3-1/2" BAKER DB PERM PKR ~ 10703~ TOP OF CMT SHEATWCOLLAR, ID = 2.68" 10703-10862 FROM LNR LAP SQZ 11/25/95 11 0791, ~~3-1/2" OTIS XN NO-GO NIP, ID = 2.75" ~~ 3-1/2" TBG-PC, 9.3#, L-80, .0087 bpf, ID = 2.992" ~ 9-5/8" CSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY R~ LOG: CNL ON 02/28/89 ANGLE AT TOP PERF: 52 @ 11646' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 1/2 11646- 11656 S 10/14/88 2-1/S" 4 11662 - 11672 S 10/14/88 2-1/8" 4 11662 - 11672 S OS/26/98 2-1/8" 4 11664 - 11674 S OS/26/98 2-1/8" 6 11680 - 11690 O O6/20/99 2-1/8" 4 11684 - 11704 S 10/14/88 2-1/8" 4 11684 - 11704 S 10/14l88 2-1/8" 4 11686 - 11706 S 08/26/98 2-1 /8" 6 11690 - 11710 O 11 /21 /98 2-1/8" 6 11696 - 11706 S 08/26/98 2-1/8" 6 11710 - 11730 O 06/20/99 2-1/8" 6 11710 - 11740 S 10/14/88 2-1/8" 6 11712 - 11732 S 08/26/98 2-1/8" 6 11750 - 11756 S 10/14/88 2-1/S" 6 11760- 11774 S 10/14/88 PBTD 7" LNR 29#, L-S0, .0371 bpf, ID = 6.184" 50~ 10802' I~ 3-1/2" BAKER SOLID NOSE SHEAROUT SUB 10803' -~ 3-1 /2" TUBING TA IL ~ 10799' ELMD TT LOGGm 03/08/91 'I 0862~ BOTTOM OF CMT SHEATH TSGR 10942' ~TOC P&A for cement ramp @ EOT Pilot Hole Whipstock @ 11,400' 11450~ Top of Cement 2.74" Pilot Hole TD @ -11,425' 12743' 2-3/8" crti'ed and perfed DATE REV BY COMMENTS DATE REV BY COMMEIYTS 09117/84 ORIGINAL COMPLETION 03/16/06 RPFi/TLH WANER SAFEfI' NOTE 09l26/90 RWO 02/09/07 DPS/PJC WRP PULLm 03/O6/O6 07/25/03 JRGKK WANERSAFEIY NOTE 03/01/07 MGS/TLH GLV GO 09/13/03 CMO/TLP DATUM MD 8 PERFS/ANGLE 05/09/07 RDW/PJC WANER SF7Y NOTE DELETm 08/14/05 KSB/TLH GLV GO 06/16/09 MSE PROPOSm CTD SIDETRACK 07~~ , '„'- ~_'~ . ~ , i ~ PRUDHOE BAY UNff WE1L: 15-11 A P~2MIT IVo: API No: 50-029-21181-01 SEC 19, T11 N, R15E, 3251.99' FEL 8 2329.92' FNL BP F~cploration (Alaska) Well name? Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Tuesday, June 16, 2009 3:40 PM To: Saltmarsh, Arthur C (DOA) Subject: FW: Well name? ~~~ '~ i~,`r~ ~ L~ Art, FYI. There will be a permit application coming. Tam Page 1 ofd ~-- From: Maunder, Thomas E (DOA) Sent: Tuesday, ]une 16, 2009 3:40 PM To: 'Endacott, Mary S' Cc: 'Hubble, Terrie L'; 'Steen, Becky' Subject: RE: Well name? Mary, et al, I checked with Steve and he agrees it is appropriate to name the redrill 18-11A with a -01-API number. Thanks for asking. Tom Maunder, PE A~GCC From: Maunder, Thomas E (DOA) gent: Tuesday, June 16, 2009 11:34 AM To: 'Endacott, Mary S' Cc: Hubble, Terrie L; Steen, Becky Subject: RE: Well name? ~~_-0~'1 Mary, et al, 1'll have to get back to you. I think you naming proposal is correct, but I need to check with Steve/Art. Tom -_ _. __ From: En , Mary S [mailto:Mary.Endacott@bp.com] Sent: Tuesday, 16, 2009 10:44 AM To: Maunder, Thomas A) Cc: Hubble, Terrie L; Steen, Subject: Well name? Hi Tom Just want to double check you agree We are getting ready to CTD sidet TDd at 4500'). We are planning to Sound OK to your Thanks, Endacott ~r plan for a well name. 18-11DPN (current TD 119 merly known as 19-11-15 which 1300ft cased and cemented lateral 18-11A. 6/16/2009 Well name? i • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA} Sent: Tuesday, June 16, 2009 11:37 AM To: Saltmarsh, Arthur C (DOA}; Davies, Stephen F (DOA) Subject: FW: Well name? Page 1 of 1 ~~~-o~ Art and Steve, Could you have a look at this? Original penetration was a tract well that only went to 4500. It appears that the original was P&Aed under a different PTD and API # in 1984. I proposed to recover the "slot" and drill 18-11 Deepen in 1987 when it was assigned a -90- API number. I think their proposal for naming the redrill 18-11A is appropriate. Tom From: Maunder, Thomas E (DOA) Sent: Tuesday, June 16, 2009 11:34 AM To: 'Endacott, Mary S' Cc: Hubble, Terrie L; Steen, Becky Subject: RE: Well name? Mary, et al, I'll have to get back to you. I think you naming proposal is correct, but I need to check with Steve/Art. Tom From: Endacott, Mary S [mailto:Mary.Endacott@bp.com] Sent: Tuesday, June 16, 2009 10:44 AM To: Maunder, Thomas E (DOA) Cc: Hubble, Terrie L; Steen, Becky Subject: Well name? Hi Tom Just want to double check you agree with our plan for a well name. We are getting ready to CTD sidetrack well 18-11 DPN (current TD 11927'; formerly known as 19-11-15 which TDd at 4500'). We are planning to call the 1300ft cased and cemented lateral 18-11A, Sound OK to you? Thanks, Mary S. Endacott BP Alaska Coil Tubing Drlg Engr office 790d 907-564-4388 endacoms@bp.com 6/16!2009 18-1lDPN (PTD #1870870) Internal Waiver Cancellation - Normal... . . S\\û\D1 All, An internal waiver was issued for TxlA communication on well 18-11 OPN (PTO #1870870) on 02/27/06. The well passed an MITIA on 03/02/07 proving two comepentent barriers. Under the new WI System Policy set to take effect on June 1, 2007, well 18-11 OPN will be Operable. The well is reclassified as a Normal well. Please remove all waivered well signs and the lamintaed copy of the waiver from the wellhouse. Thank you - Jack L. Winslow (for Andrea Hughes) Well Integrity Engineer office - 659-5102 pager-659-5100, 1154 ~EDMAY 162007 1 of 1 5/1 0/2007 11 :06 AM MICROFILMED 9/28/00 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown _ Stimulate_ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _X (SQZ) 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development__X RKB 55 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1276' FNL, 4522' FEL, Sec. 19, T11 N, R15E, UM 18-11 ,~ At top of productive interval 9. Permit number / approval number 1795' FNL, 1627' FWL, Sec. 30, T11N, R15E, UM 87-87 At effective depth 10. APl number 2187' FNL, 3285' FEL, Sec. 30, T11 N, R15E, UM 50-029-21181-90 At total depth 11. Field / Pool 2330' FNL, 3252' FEL, Sec. 30, T11N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summar Total depth: measured 11927 feet Plugs (measured) Tagged PBTD @ 11740' MD (4/09/1999) true vertical 8983 feet Effective depth: truemeasuredvertical 11740 feet8868 feet Junk(measured)ORIGINAl_ Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 20" 19oo # Poleset 110' 110' Surface 2407' 13-3/8" 2400 sx cs m & 4oo sx cs U 2462' 2462' Production 11025' 9-5/8" 1oeo sx C~ass G & 300 Sx CS ~ 11062' 8437' Liner 1164' 7" 300 sx Class G 11927' 8983' Perforation depth: measured 11690'-11710'; 11712'-11732'; 11752'- 11780'. RECEIVED true vertical 8837' - 8849'; 8850' - 8863'; 8875' - 8892'. Naska 0ii & 6as Cons. C0mmissio:' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 43' MD; 3-1/2", 9.3#, L-80, PCT @ 10803' MD. Anchorage Packers & SSSV (type & measured depth) 9-5/8" x 3-1/2" Baker DB Permanent Packer @ 10700' MD; 3-1/2" Otis FMX TRSV SSSV @ 2187' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation - - - Subsequent to operation 742 6376 71 470 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil .__X Gas __ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~ '~. ~ Title Arco Engineering Supervisor Date ,.~" ////- ? ~ Erin Oba Prepared by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 18-11 DESCRIPTION OF WORK COMPLETED ACID WASH LARC SQUEEZE FOR GSO / PERFORATION Date Event Summary 8/22/98: 8/24/1998: 8/25/1998: 8/26/1998: 9/09/1998: 11/20/1998: 11/21/1998: 11/29/1998: MIRU CTU & PT'd BOPE. Killed well. RIH & tagged 11790' MD. Pumped 11 bbl gelled sand slurry containing 2800 lbs of 20/40 mesh River Sand, to place an isolation plug across the open perforation intervals located @: 11686' - 11706' MD (Zone 1) Reference Log: BHCS 9/12/1987. 11712'- 11732' MD (Zone 11 11752'- 11780' MD (Zone 1) Tagged TOS @ 11685' MD. POOH w/CT. RD. RIH & tagged TOS @ 11682' MD. RIH & dump bailed 2.5 gal liquid Latex Cap. A CTU Acid Wash / Cement Squeeze for Gas Shutoff were performed as follows: MIRU CTU. PT'd BOPE. Killed well w/130° Slick 1% KCL Water & Crude. RIH & tagged TOS @ 11703' CTM. Reciprocated an Acid Wash across the open perforation interval f/11664' - 11674 as outlined below. (a) 10 bbls 70% Diesel / 20% Xylene / 10% Mutual Solvent @ 1.6 bpm, followed by (b) 15 bbls 12% HCL - 10% Xylene - 3% Acetic Acid @ 1.6 bpm, followed by (c) 10 bbls 9% HCL - 1% HF - 3% Acetic Acid @ 1.7 bpm, followed by (d) 15 bbls 12% HCL - 10% Xylene - 3% Acetic Acid @ 1.7 bpm, followed by (e) 20 bbls NH4CL + 50 Ib/Mgal Citric Acid @ 1.7 bpm, followed by (f) 100 bbls hot 1% KCL Water. Pumped 32 bbls of Neat Latex Acid Resistive Cement to squeeze off the open perforation intervals mentioned above. Placed 5 bbls of Cement behind pipe & built a max sqz press to 3100 psi. Squeeze broke - unable to maintain a steady psi above 1700 psi. Contaminated Cement w/Biozan & cleaned out contaminated Cement to 10679' MD. POOH. Left 500 psi on wellhead. RD. RIH & tagged TOC @ 11686' MD. Injectivity test - 0.5 bpm @ 2000 psi. A CTU Cement Re-squeeze was performed as follows: MIRU CTU. PT'd BOPE. Killed well w/1% KCL Water. Low injectivity - 0.3 bpm @ 1700 psi. RIH & tagged TOC @ 11680' MD. Pumped 48.5 bbls of Neat LARC & squeezed to 2400 psi for 1 hr. Placed 7 bbls of Cement behind pipe. Contaminated Cement w/Biozan & jetted Contaminated Cement f/wellbore to 11680' MD. POOH while FP'd well. Left 500 psi on wellhead. RD. RIH &UR'df 11681'- 11686' MD. 11/30/1998: UR'd to 11696' MD. FCO'd to 11800' MD. 18-11 DESCRIPTION OF WORK COMPLETED ACID WASH LARC SQUEEZE FOR GSO ! PERFORATION Date Event Summary 4/09/1999: 4/11/1999: RIH & tagged PBTD @ 11740' MD. MIRU & PT'd equip. RIH w/perf guns & reperforated 20' located @: 11690' - 11710' MD (Zone 1 B) Reference Log: BHCS 9/12/1987 Used 2-1/8" carriers and all shots were 6 SPF, underbalanced, & 0° phasing. POOH. ASF. RD. Returned well to production & obtained a valid well test. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing ~ Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, 431' FWL, Sec 19, T11N, R15E, UM. At top of productive interval 1795' FNL, 1627' FWL, Sec 30, T11N, R15E, UM. At effective depth 2282' FNL, 1797' FWL, Sec 30, T11N, R15E, UM. At total depth 2314' FNL, 1804' FWL, Sec 30, T10N, R15E, UM. 5. Type of Well Development X.~ Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 55' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 18-11 9. Permit number/approval number 87-87 10. APl number 50- 029-21181 '-'- (~0 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11927 feet 8983 feet Plugs(measured) PBTD Tagged @ 11746' MD (3/29/96). Effective depth: measured 11746 feet true vertical 8871 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1900# Poleset 110' 110' Surface 2407' 13-3/8" 2400 Sx CS Ill & 400 Sx CS II 2462' 2462' Production 11025' 9-5/8" 1000 Sx CIG & 300 Sx CS I 11062' 8435' Liner 1164' 7" 300 Sx Ci G 11927' 8983' RECEIVED Perforation depth: measured 11664 - 11674'; 11686 - 11706'; 11712 - 11732'; 11752 - 11780' MAY 1 5 1996 true vertical 8820 - 8827'; 8834 - 8846'; 8850 - 8862'; 8875 - 8892' , JklaMm, 011 ~ ..~..Cens. Commission Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 43' MD; 3-1/2", --ou, ~.~, PCA~-C,t~r~t~03' MD. Packers and SSSV (type and measured depth) Baker DB Perm Packer @ 10700' MD; Otis FMX TRSV SSSV @ 2187' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure ORIGINAL 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 1372 7863 0 Tubing Pressure 0 499 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~ '~'1. ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date E- ~'- ~'~ SUBMIT IN DUPLICATE 18-11 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 3/29/96: RIH & tagged PBTD at 11746' MD. 4/4/96: MIRU & PT equipment. Reperforated: RIH w/perforating guns & shot 30' of reperforations as follows: 11664 - 11674' MD (Zl) 11686 - 11706' MD (Zl) Ref. Log: BHCS 9/12/87. Used 2-1/8" carriers & shot 4 spf at 0 degree phasing at underbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to production & obtained a valid welltest. RECEIVED MAY 1 5 1996 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA r-~' AND GAS CONSERVATION CC '~-'iISSION REPORT OF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing ~ Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, 431' FWL, Sec 19, T11N, R15E, UM. At top of productive interval 1795' FNL, 1627' FWL, Sec 30, T11N, R15E, UM. At effective depth 2282' FNL, 1797' FWL, Sec 30, T11N, R15E, UM. At total depth 2314' FNL, 1804' FWL, Sec 30, T10N, R15E, UM. 5. Type of Well Development X 6. Datum of elevation(DF'orKB) /' 55' RKB ' '~,~ feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 18-11 9. Permit number/approval number 87-87 10. APl number 50 - 029-21181 11. Field/Pool Prudhoe Bay Oil Pool Exploratory Stratigraphic Service 12. Present well condition summary Total depth: measured true vertical 11927 feet 8983 feet Plugs(measured) PBTD Tagged @ 11727' MD (12/10/95) Effective depth: measured 11727 feet true vertical 8859 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 1900# Poleset Sudace 2407' 13-3/8" 2400 Sx CS III & 400 Sx CS II Production 11025' 9-5/8" 1000 Sx CIG & 300 Sx CS I Liner 1164' 7" 300 Sx CIG Measured depth Trueve~icalde~h 110' 110' 2462' 2462' 11062' 8435' 11927' 8983' Perforation depth: measured 11696- 11706'; 11712 - 11732'; 11752- 11780' true vertical 8840 - 8846'; 8850 - 8862'; 8875 - 8892' Tubing (size, grade, and measured depth) 3-1/2", L-80, 9.3#, PCT @ 10803' MD. JAN 1 6 AJaska OJJ & Gas Cons. ~ch0ra,ge Packers and SSSV (type and measured depth) Baker DB Perm Packer @ 10700' MD; Otis FMX TRSV SSSV @ 2187' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached 14. Treatment description including volumes used and final pressure Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation Shut In Subsequent to operation 509 ~ 4890 0 -- Tubing Pressure 463 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby,certify that the fore~,~i~ ~ Signe~~*'~ ~' ~ Form 0~#04 Rev 06/15/88 and correct to the best of my knowledge. Title Engineering Supervisor Date ///'7, /~ SUBMIT IN DUPLICATE 18-11 DESCRIPTION OF WORK COMPLETED LEAKING LINER LAP CEMENT SQUEEZE I 0/2 7/9 5: A Pre Liner Lap Squeeze isolation Sand Plug was pumped fullbore as follows: MIRU & PT equipment. Pumped 60 bbls of gelled sand slurry containing 14,800 lbs of 20/40 mesh sand to place an isolation sand plug across the perforation intervals located between 11696 - 11780' MD. Rigged down. I 0/29/95: RIH & tagged top of sand plug at 11292' MD. I 013 I/9 5: MIRU CTU & PT equipment. RIH w/CT & pumped an additional 50 bbls of gelled sand slurry containing 10,000 lbs of 20/40 mesh sand to raise the top of the sand plug. Made a final top of sand tag at 10890' MD. POOH w/CT. Rigged down. 1 I/25/95: An Acid Wash & Cement Squeeze of the leaking Liner Lap were performed as follows: MIRU CTU & PT equipment. RIH w/CT & loaded the wellbore w/Seawater. Tagged sand plug at 10885' MD, then pumped a pre-squeeze acid wash across the liner lap. Pumped: a) 10 bbls 1% NH4CI Water @ 1.9 bpm, followed by b) 10 bbls Xylene @ 1.9 bpm, followed by c) 10 bbls 12% HCI w/10% Xylene, followed by d) 5 bbls 6% HCI - 0.75% HF @ 1.8 bpm, followed by e) 5 bbls 12% HCI w/10% Xylene, followed by f) 45 bbls 1% NH4CI Water Flush, followed by g) 93 bbls Seawater Overflush. Swapped to pumping 3 bbls Neat Latex Acid Resistive Cement, followed by 21 bbls Latex Acid Resistive Cement w/3.5 ppb fibers. Attained a maximum squeeze pressure of 3500 psi, and placed a total of 9 bbls of cement behind pipe. Contaminated cement w/biozan & jetted contaminated cement from wellbore to 10730' MD. POOH w/CT. Rigged down. 12/5/95 - 12/7/95: RIH w/CT milling BHA & milled through cement & sand plug, then performed a fill cleanout jetting biozan to 11885' MD. POOH w/milling BHA. Rigged down. 1 2/1 0/95: RIH & tagged PBTD at 11727' MD. Placed the well on production & obtained a valid welltest. JAN 1 6 Alaska Oil & Gas Cons. Commission Anchorage GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie RECEIVED RECEIVED Company: t~2 2 1995 2 2 '~995 Alaska 011 & Gas Cons. C0mmissi0ricommission Anchorage /~laska 0ii & Gas Cons. Anchorage 3/22/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk · D.S. 18-11 95067 DUAL BURST TDT-P .~-~"~' 021895 i D.S. 4-26 95079 CNTG /=~ ~ 1'~ 0 022195 I DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 A'Fi'N: Sherrie NO.9296 Company. 3/2/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Well Job # Field: Prudhoe Bay Floppy Log Description Date BL RF Sepia Mylar Disk D.S. 1.-.2~,~ LEAK DETECTION 021 995 I 1 D.S. 4-1~2~) TUBG PUNCHER RECORD 0218951 I 1 D.S. ~~, RESERVOIR SATURATION . 0221 95 I 1 D.S.4~~ CNT-G 0221 951 I 1 D.S. 4-19`````) PERFRECORD 021795; I 1 D.S. 4-~3~] PERF RECORD 021 995; I 1 D.S. 4-48''''~ PERFRECORD 021 395' I 1 ~D.S. 6-3~..~ PRODUCTION LOG 0221 95 I 1 D.S. 7-4A~,.~ PERF RECORD 021 595 I 1 D.S. 9-2~..~ ~ INFLATABLE BRIDGE PLUG 021795 I 1 D.S. 9-11 ~ PERF RECORD 021 895 I 1 D.S. 9-45 ~ PERF RECORD 022095 I 1 D.S. 13-20~ INFLATABLE BRIDGE PLUG 021795 I 1 D.S. 11-42n~ PROD PROFILE 022095 I 1 D.S. 15-11~ ~ PROD PROFILE 022095 I 1 D.S. 18-T,t-.. ¥ DUAL BURST TDT-P 021895 I 1 D.S. 11-0~ 95058 DUAL BURSTTDT-P 021195 1 D.S.-1-T-g~-q=J 95057 DUAL BURST TDT-P 020595 1 ,, SIGNED: RECEIVED Alaska 011 & Gas Cons. Commission Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION August 19, 1994 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279.1433 TELECOPY: (907) 276-7,542 David Sutter, Land Manager ARCO Alaska Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Suspended Wells Compliance with regulations Dear Mr. Sutter: ARCO Alaska Inc. has 25 suspended wells as shown on the attached lists: ARCO SUSPENDED WELLS PRIOR TO 1980 and ARCO SUSPENDED WELL SINCE 1980. The applicable regulation is as follows: 20 AAC 25.110 SUSPENDED WELLS (a) Upon application by the operator under 20 AAC 25.105(e), the commission will, in its discretion, approve the suspension of a well if the well (1) encounters hydrocarbons of sufficient quality and quantity to indicate the well is capable of producing in paying quantities as reasonably demonstrated by well tests or interpretive formation evaluation data; or (2) is reasonably demonstrated to have future value as a service well. For each well on the attached lists of suspended wells, please provide data showing that the well meets the criteria of (1) or (2) above or advise as to your plans to abandon the well. Wells that meet the criteria of (a) above that you wish to maintain as suspended, as required by 20 AAC 25.110(e), must have well site inspections this year prior to snow covering the locations. . Chairman encls c: Blair Wondzell bew/llarsusp PERMIT 00-0242-0 68-0095-0 69-0036-0 73-0027-0 74-0056-0 74-0057-0 76-0013-0 76-0017-0 76-0034-0 78-0017-0 API NUMBER 029-21821-00 029-20004-00 029-20017-00 179-20004-00 029-20150-00 029-20151-00 029-20195-00 029-20199-00 029-20208-00 029-20278-00 ARCO SUSPENDED WELLS PRIOR TO 1980 AS OF AUGUST 1994 WELL WELL WELL NAME CLASS STATUS PRUDHOE BAY UNIT OWDW-C SER SUSP DELTA ST 1 EXP SUSP PUT RIV ST 1 EXP SUSP ~AVIK LrNIT 3 DEV SUSP DELTA ST 2 EXP SUSP GULL IS ST I EXP SUSP GULL IS ST 2 EXP SUSP HIGHLAND ST 1 DEV SUSP W BEACH ST 3 EXP SUSP W MIKKELSEN ST I EXP SUSP STATUS DATE 6/23/73 2/27/69 7/01/69 5/02/74 5/17/75 4/01/76 4/22/77 4/12/76 7/26/76 11/11/78 SECT 11 10 07 O8 35 28 28 24 25 32 TWP 10N 10N 10N 03N llN 12N 12N llN 12N 10N P~NG 014E 016E 014E 023E 016E 01SE 015E 011E 014E 019E MER U U U U U U U U U U ARCO SUSPENDED WELLS SINCE 19 $ 0 AS OF AUGUST 1994 PERMIT 60-004140 82-0038-0 82-0218-0 83 - 0181 - 0 84-0156-0 84 - 0205- 0 86-0056-0 89 - 0013 - 0 89 - 0041 - 0 90~0036-0 91~0069-0 92 ~0065-0 93 - 0174 - 0 93 ~0179-0 94 -0043-0 APl NUMBER 133-10142-00 029-20727-00 029-20888-00 029~21056-00 029-21181-00 029-21221-00 029-20138-01 029-21912-00 029-21937-00 029-22027-00 029-22173-00 029-22261-01 029-22419-00 029-22423-00 029-20614-01 WELL WELL WELL NAME CLASS STATUS SWANSON RIV UNIT 34-15 DEV SUSP KUPARUK RIV UNIT 1H-05 DEV SUSP P~AVIK ST I EXP SUSP HEMI SPRINGS ST I EXP SUSP PRUDHOE BaY LIMIT DS18-11 DEV SUSP PRUDHOE BaY UNIT DSll~15 DEV SUSP W BEAC~ ST 1-a SER SUSP PT MCINTYRE P1-03 EXP SUSP PT MCINTYRE P3-01 DEV SUSP KuPARuK RIV UNIT 15-20 DEV SUSP KUPARUK RIV UNIT 1L-26 DEV SUSP PT MCINTYRE P2-50A DEV SUSP KUPARUK RIV UNIT 2E-17 DEW SUSP KUPARUK RIV UNIT 2E-05 DEV SUSP PRUDHOE BaY UNIT DS12-13A DEY SUSP STATUS DATE 8/21/91 5/18/82 4/03/83 4/03/84 9/17/84 2/14/91 5/06/86 4/26/89 7/03/89 3/31/91 6/09/91 8/30/92 4/25/94 4/25/94 4/03/94 SECT 15 33 32 19 33 25 16 22 29 32 14 36 36 18 TWP 08N 12N 09N 10N llN 11N 12N 12N 12N llN 11N 12N 11N llN 10N 009W 010E 009E 011E 01SE 015E 014E 014E 014E 010E 010E 014E 009E 009E 015E MER S U U U U U U U U U U U U U U tLA~IiA OIL AND GAS CONSERVATION COMMISSION .' / WALTER J, HICKEL, GOVERNOR 3001 PoRCuPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279~1433 TELECOPY; (907) 275~7542 November 5, 1992 James Weise Petrotechnical Data Group BP Exploration P.O. Box 196612 Anchorage, Alaska 99519-6612 Dear Mr. Weise: I spoke with Bill Michaelson on November 3 regarding changes the AOGCC plans to make to API numbers in our databases and well files. The · following wells have duplicate API numbers and should be changed as follows: Well Name Prudhoe Bay Unit DS 18-11D Permit #' Old API Number New API Number 87-87 50-02921181 50-02921181-90 Pt. McIntyre 3DPN 89-3 '50-02921779 50-02921779-90 We will not announce these changes to the public until the first week of December to give you the opportunity to make the necessary 'changes and notify all the groups concerned. Give me a call if you would like to discuss this matter further or if you have any questions. Sincerely, Jack Hartz Petroleum Reservoir Engineer STATE OF ALASKA ALASKA .AND GAS CONSERVATION CC,. /IlSSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, 431' FWL, Sec. 19, T11N, R15 E, UM At top of productive interval 1795' FNL, 1627' FWL, ,Sec. 30, T11N, R15E, UM At effective depth 2282' FNL, 1797' FWL, Sec. 30, T11N, R15E, UM At total depth 2314' FNL, 1804' FWL, Sec. 30, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic . Service 6. Datum of elevation(DF or KB) 55RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 18-11/J~ .~m 9. Permit' number/approval number 87-87/9O-686 10. APl number 50 - 029-21181 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11927 feet Plugs(measured) 8983 feet Effective depth: measured 11886 feet true vertical 8958 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1900# Poleset 110' 110' Surface 2407' I 3-3/8" 2400 sx CS III & 400 sx CS II 2462' 2462' Production 11025' 9-5/8" 1000 sx CI 'G' & 300 sx CS I 11062' 8435' Liner 1164' 7" 300 sx CI 'G' 11927' 8983' RE EI /EE Perforation depth: measured 11696' - 11706', 11712' - 11732' true vertical 8840' - 8846', 8850' - 8862' Aiaska 0it & Gas Cons. Cem~g'~ss'~o~" Tubing (size, grade, and measured depth) 3-1/2",L - 80, 9.3#, PCT @ 10803' MD Anchot'age Packers and SSSV (type and measured depth) Baker DB packer @ 10700 'MD, 3-1/2', Otis FMX SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 169 528 0 Tubing Pressure 0 208 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify t~t the~ct to the best of my knowledge. Signed ~/'~ Title Senior Area Engineer Form 10-454 Rev 06/15/88 Date ~(~ SUBMITfi~ DUPLICATE DS18-11 DESCRIPTION OF WORK COMPLETED Reperfs to Dilute GOR 5/22/91 MIRU SLU. Pre - Perf Tag. PBTD= 11831'MD Rat Hole=51' 5/23/91 MIRU ELU The subject well was perforated as indicated below. Ref. Log · BHCS (9/12/87) Geologic MD (ft) TVD (ft) SPF Zone 11696 - 11706 8840 8846 6 lA 11712 - 11732 8850 8862 6 lA 5/24/91 RDMO ELU. Well Tested and Shut In. Awaiting Mechanical GSO. Comment Reperfs Reperfs P,O, BOX tO036e-_ .................................................. ,. ~ .-. ANCHORAGE, A'LASKA 995~0 ._ ~, . . REFERENCE: ARCO CASEQ HOLE FINALS " .-. ~-25 . .5-22-~'?.-':".;.COLLAR/PERF .. '~ - . ' RUN ~ ,' 5' " . ATLAS 6[I-~ 5-3J .: , 5~24m.~:.~,~.~.~'~;¢~C~T',.-:.~f,:: - . . :-,, ~/i/~'_____ ' RUN ' ... 6-t .-::.:-~:':/;?-]D-2~gt:J;>JT..-:-PFC (RET~NER) '~GZ '.:- Z Z:" -'.~ RUN t ,'..75~.-' .J:.~..".' .-/-...; ~TLRS. ........... ~. 6 ~.f .7._~?~jj :~;.~5 t2e.~'~ t;'~;~COLLAR/PERE_'__.;. ;L ....... ';_._L: _~_~ ~~:..:: ...'J RUN j J.~ ..~..5~ '" -' '-- .'~ RUN t ~._: 5' ' :" : R TLAS . .9-t e ...:.'-:~: .:5-2e-.9.i.,~,:;-~i:..COLLAR/PERF - . .... , ...... . "'; "~;. ' t'.:'~.';~.>'?~ ~'2 ~. ..ss~S~::~F, C'";~'~-w::-":'.~:"~:.-''- .-.:.;-.',~---A?,~.?..s~-~;:~'=~?;,,:~.~,y,;~,,;.-?~,..~..~' RUN - ;'.:-F'LEA,~ E :. S I GN.~'AN D:~RETURN".~ THE:iA TTACHED ~ COP Y .AS '; RE CE I P T. OF .. DA TA.,~.~;:?~%; -'7~' ",..~,,-.~, ~¥., . .'.' ~-~.,":~Z~.~,?-,~.~ -~'~f.-.~: ~:~ .-. ........ ~-,'~' S. ?''~- ,' :~r~.-.'....,:~-",,.,~':.~', - .' -~;:~:,:-..> :-;._ -"..,:::~;~;~:~.~..?~.?~ . ,- '- ~: ..... - .'";; .--?.-'.,. - '... '..~ ~-.<;F.:- -'-~'-~'~.;'~;~'~/-"~ ~ :/;;~-~ · :~;~ " ' :. '~ '%; '~':'---~',-f;.'2:?~',,,,~~-, ~-' ~.'-A'~-'~ ~-~ '.:"~' ::" :,..~'- ."?, .... - , V '~J . . :~'. '.: ;~..-~2/~E,~..,' ~-z,.., ~.~,?Y.,',.'~ ~,: ~. ~. ".,,,- -? - . . .-' · · i. .... ~.~;;>?' -,~;-~--~_ .:~ ~.,.~=.'~.,J~-j-~z.,$~,.?~'~,s. ' .--,?:,=-~,~,'~>~-.~.~-=-' -"~' <.-';-':. ;:.-" - .' '¢ ~;,~ .' ' -"',:~'-~-'"= .- ~ ........ ~". ., - ".'-=' .......... ~ ...... ==~. ...... ~ ................................. . ...... . ..., .... ,., . .... ,,. ...... , ................. ~.. , . .... ,_. ..... ,...~.-. ,-..=, ....... .-....~-.~=~==~..,,¢,-.-~-,~..,-.=...~..~ .... .,.-... ....... ......... ... ......... .._. ......... . ....... ~.,., ..... ~:~.., ......... ,..,. ..... . .... . ....... "-,' "-' -='=.~ . ~ "~ _:-i ..';-' . ' '. ' ~ ~ ' : ;' · .='- ~<'-'-,':.-'~ ....... '"~'-' ',- ..... '"--';' .- . .. :_~. , .. CENTRAL '-FILES -'= ....... , PHILLIF$ . · ' .-'"::':-~ '~-' . b ' ....... "~:: ...... ' , L" ILE ' '"' ~""~"~:':¥" .... ~':'"~' '~'~ '"' ":" '"~"~" " "' -"-"D & H'.' - '":'-~ ' R & D .~'~:';... ' ...... -. ~ EXXON _.- ~ ~TATE OF ~L~&'K~ ' ' ' . .. ~~' HO~L .... ~-' ..... ~ . .... . . -. · .. ARCO ALASKA, INL], P,Ii.), BOX t ~(')S60 ' ~' ANCHORAGE, ALASKA .99~1~ D A 'T' El · 5 -.. 2 4 .... 9 i ~, F;,' E F E F;,' E"' N C Ii!: ' A I:;: C 0 C A S F' D I"1 [)!.. E F: I I'.! A L ]:NJ, PROF', IN J, F:'ROF, I NJ. PROF, F'I"'< O g, F:'I'?OF. GA~, ~'' ENI'RY GAS LIF'T I N J. P F,' 0 F:, F' F;,' 0 D ~ F' F;.'. 0 F' ~ F' R 0 D ,. P F;..' 0 F:' ~ GAS L. ZFT F'ROI), PROF', TENP, R U N i , .~':"..," RUN t , 5" F:,'LJN i , 5" F;,'Uiq i, 5" RUN i , 5" RUN i , 2" &~" RUN i, 5" F;:U Nt , 5" RUN i , 5:" I:~ II RUN i, .. F:zUN i ,..,.~'" RUN i, 5" C A H C O · C A M C 0 C A t'.'1C 0 C A I,i C 0 C A t,i C 0 CAMCO C A H C 0 C A i',~ (:. 0 C A H C 0 C A H C 0 C A M C 0 C A M C 0 F'LEASE SIGN AiWI) F;,'ETLJRN THE ATTACFIED COPY AS RE:E:EIPT C]F:' DAI'A, HAVE A NICE DAY!, SONYA WAL. LACE ........... :..: ~[~FRE. VE.I, ATO""i 529 ' TRANS':~ 9 ':: DISTR]:BUTION -,. CENTRAl_ FILE,, "" C:HEVRON ' · '11' D & M ,Il, · .. FXTENSION EXF:'LORAT ION EXXON -ir tqARAI'HON ~ MOBIL F' H I !.. L I P $ F:'B WEi...L I::'IL. ES '"".-B P X STATE OF' ALASKA 'Il' 1' E X A C O · ARCO ALASKA, INC. F'.O. BOX iOOf60 ' ANCHORAGE, ALASKA 995i,3 DATE · 5-'22-9i REFERENCE. ARCO CASED HOLE FINALS S-22 i 2-28-90 GR ~-'~.-~ 4 ..... ..,_ o~, ~BL,CCL 6-7 t 2-5-9,~ TEMP/$PINNER 7-28 5-4-9~ LEAK DETECT. 9-S ~ 2-~ S-9~ CORR GR 9-45 ~ 2-~ ~-9~ ' TEMP i~_~-~ i~-'~°-°~~, , ~ GR t'~ "- 8B 5- i '~-c' i~ , VEn'T t LOG,,. i2-iS 5--~-9i PROD. PROFILE !~'~--n'::'~, 5--~-o i~ , F'ROD . ,PROFILE i4-i~ 5-t-9i INJ. PROFILE t 6--6 ~-6-9 ! COLLRR/F'ERF t 6-.9A 5-D-9f CE T t 6-9A 5-Z-9! CET f6-9A 5-6-9f F'~C~ER REC. 18-!t ~-4-9t 6~ DETECTION R LJ N RUN RUN RUN RUN RUN RUN IN;UN R U N F:UN R U N RUN RUN RUN RUN RUN PI_EASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. RECEIVED BY..~__~___~______~~~/~'-! HAVE A NICE DAY! SUNNY WALLACE ATO-t~'~ APPROVED 'TRANS.~ 9i HRS A'FI_AS HRZ CAMCO HRS HRZ HRS' A TI_AS CAMCO CAMCO CAMCO A'I'LA~ SCH SCH ~CPt CAMCO DISTRIBUTION CENTRAL FILES F'L~ -F:;F-"ON .--I Il_ ~ .~'. EXTENSION EXPLORATION EXXON MARATHON MOBIL F.'HILLIP$ PB WELL FILE::'-'_-: R *-, D STATE OF ALASKA TEXACO THE AF'I~ FOR 5-2e IS 50-¢29-22i57 RECEIVED MAY 2 5 1991 Alaska Oil & Gas Cons. Commj~ion ......... Anchorage '% ~ATE · 4- 4-c? ~ !:;:Ii:I::'EI.?.FNCE' ARCO CASED 140LE I::INAI..S 2- ~ 9 2 .... i i - 9 ~ F F. 0 D U C I .'I: 0 N F:' F;..' 0 F I I... E :3 - 2 ,S - i 6 - 9 ~ L I.E A K D Iii: T E C 'l" I 0 N ,'!; .... .'"".', t ..... ! 8'" 9 t S F:' I N N E R / i" Iii: M P S .... 4 S - t 7- 9 t I N,..! E C T I 0 N ":" .... i ,":" ".~ .... f ?-9 i .1: N J E C T I 0 N z). -- :') ' , ,.... b 'i -5- 9 J P I T ': .... ;~ i ~i".,-6'"-9 i F' I T S %) *% · 7 .... t6 S .... i4-9t PI.T' ....... '"' ~4,.J E ..... I 0 N," T E". M P : .... ct, 4 6 .... i ,:..-..., .... c;,, t ]: ;, .: r' ;" it-9 i .... '? .... 9i PI'¥$ t i "' 2 8 t ..... t 2 -" 9 t P I:;~ 0 I) U C'."F I 0 N I:;' R 0 F: I I... E i S '- t 9 :'.'3 '- t 6 - 9 t I N,J F: C 'l" I 0 N i S'"' 2 0 3 .... i '?-" 9 t I N,J Iii: C l' I 0 N i '°-~°")" A ,3 ,..S~-~ S'-t 6-9t IN,JI.::CTION i'.:.Y-1 i 2-'t 3-9t F:'ERF' BF;~EEAI<-DOWN · . ") ,,.) . . i 6-':~ ,=.-,:S-9 t SPINNER/INJIFCT iON i lit .... l t 3-8"- 9 t P I !'~' F'I..EASE SIGN AND RI:TURN THE ATTACHED COF'Y Rli!: C E I V E D B Y ..... ~_:- HAVE A NICE DAYm SHARON WILSON _ AS RECEIPT OF' T H .... . ,~DI$1RI£U1 10N , ~ " '-' 9 IS 5 029- CORRECT AFI,. FOR=4.6-,. ~- 2~544. PHILLIF'$ PB WELL... FILES R & D BPX ......................... ~'- $'¥'ATI:E OFr ALASKA I'EXACO ..... '. I"1 I:;,' S C A M C 0 !"11:(' S C A ~'"i C 0 C A i'q C 0 i..i i:;: 4 ,.,, S C A i'i C 0 C A i',i C [1 I..i F;.'. S !..i 1:;..' S C A M C 0 C: A t.t C 0 C A M C 0 I"t R $ Iq R :!;' I"IRS R E F:' E R E i'! C E ' A R C E[ C A 2 E D I"10 L.. E F:' I N A L.. 3' ~ C H ,'ii.' C I.'1 5' C I..! I..I I... ;ii.' r::, ~'1... ¢:~.'? t..I I... ,S.' I..I I... I..t I... ,'.? A [' I... A ,~..; A i' I... ¢.:i A I [... ~::'~ ;};: r::'l 1' I... A A f' I... ~::~ E.' RECEIVED MAt?. ', 1991 Alaska gil & Gas L;uns. Commission Anchorage. STATE OF ALASKA .... .... · ALASKA' ~-'"' AND GAS CONSERVATION CC IISSION: REPORT (Jr: SUNDRY WELL OPEHATIONS 1. Operations performed' Operation shutdown . Stimulate X Plugging Pull tubing ... Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. LOcation of well at surface 1278' FNL, 431' FWL, Sec. 19, T11N, R15E, UM At top of productive interval 1795' FNL, 1627' FWL, Sec. 30, T11N, R15E, UM At effective depth 2282' FNL, 1797' FWL, Sec. 30, T11N, R15E, UM At total depth 2314' FNL, 1804' FWL, Sec. 30, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 55 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 18-11. j~jo :~f~/ 9. Permit number/approval number 87-87/90-686 10. APl number 50 - 029-21181 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured 11927 feet true vertical 8983 feet Effective depth: measured 11886 feet true vertical 8958 feet Casing Length Size Conductor 80' 20" Surface 2407' 1 3-3/8" Production 11025' 9-5/8" Liner 1164' 7" Plugs(measured) Junk(measured) Cemented 1900# Poleset 2400 sx CS III & 400 sx CS II 1000 sx Cl 'G' & 300 sx CS I 300 sx CI 'G' Measured depth True verticaldepth 110' 110' 2462' 2462' 11062' 8435' 11927' 8983' true vertical 8875-8878'; 8878-8881'; 8881-8889'; 8889-8892' Tubing (size, grade, and measured depth) 3-1/2", L-80, 9.3#, PCT @ 10803' MD Perforation depth: measured 11752-11758'; 11758-11762'; 11762-11776'; 11776-11780'R E 6 E ~V E D JAN 2 8 ]991_ Ala~._./~,Ojj & Gas Cons. Cemmlssl '' ~ch0rage Packers and SSSV (type and measured depth) Baker DB packer @ 10700' MD; 3-1/2', Otis FMX SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation '1"~;. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 0 0 0 -- 169 528 0 16. Status of well classification as: Oil. X Gas Suspended .. Service ,, Tubing Pressure 0 208 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. S,igned Title Sr. Area Operations Engineer Form 10~404 Rev 06/15/88 601 MRM c: J. Gruber, ATO-1478 SW SUBMIT IN DUPLICAT~ DS 18-11 FRACTURE TREATMENT OF ZONE 1 DESCRIPTION OF WORK COMPLETED I 0/1 I/90: MIRU & pumped a Perforation Breakdown Treatment through perforations at: 11752 - 11758' MD Ref. Log: BHCS 9/12/87. 11758 - 11762' MD 11762 - 11776' MD 11776 - 11780' MD Pumped: a) 50 bbls Gelled Seawater, @ 20 bpm, followed by b) 110 bbls Seawater, w/ball sealers, @ 14 bpm, followed by c) Shutdown. ISIP @ 1650. Surged & resumed pumping: d) 48 bbls Seawater, @ 20 bpm, followed by e) 28 bbls M/W Flush, followed by f) Shutdown. Ran Temperature Log. Rigged down. 10/15/90: MIRU, & PT equipment. Pumped a Propped Fracture Treatment through open perforations at: 11752 - 11758' MD Ref. Log: BHCS 9/12/87. 11758 - 11762' MD 11762 - 11776' MD 11776 - 11780' MD Pumped: a) b) 173 bbls Pre Pad, @ 20 bpm, followed by Shutdown. ISIP @ 2080. Resumed c) d) e) f) pumping: 314 bbls Cross Linked Pad, @ 20 bpm, followed by 202 bbls Slurry w/proppant concentrations of 1 to 12 ppg, followed by 23 bbls 40# Gelled Flush, followed by Shutdown. Placed a total of 3,400 lbs of proppant into the formation. Rigged down. 10/19/90: Cleaned out proppant from wellbore. Returned well to production, and obtained a valid production test. ARCO AI...A,.'~KA, :I:NC,. I::',. 0 ~ BCIX i (')(').36¢," ,q N C H 0 t:;.: rq E Ii."., (-':, L r.t.,~.~,:' I< ~'~ S:' 9' 5: i (') i ,,:i) .... i 'i 5 ..... i 3 .... ':.:,:',::'.':, 1::'):) K --- 'i (-),:P / E. F..' / B 0 R (:t X :[ N,] :(';, :i: :ii: T F..' :1: BLt "i' ]: (:) i",! ARCO AL. ASKA, INC F:', O, BOX i 00,35(') AN[:I-'IOI'?A61E, AI...A.S'K A 995 t;: IE F: I:: I:;,' E N C, I":' ARC[) CASED HOI..IE F:INAI...S ....-"9-"S i O-t 2-'90 LEAK DETFC'F I ON ..5 8- 1 4 t 0"- ~ 0-90 TEMF' I::'i._EASE S I (.'iN AND F;.:E I"UF.~ ~'~i:".,. O~']'AC:I"IE:D !.-! A V E A N I C F: D A Y. Il & Gas Cons. Commission Anchorage ,S'At...L.Y FIOFF'F.[C:K ER A'i" 0 .... 'i 5'2 9 RUN RUN RUNS RUN COPY AS """" F~E. UE:.IF'T OF DATA, AF:'F:'RC)VI!£ ~ :? (!)q 27 CAMCO tX A H C 0 (;AMC[) CAMCO D 12 ]" R I B U T I 0 i'..! · ,-."' r'. ..... [:' N T !:;.'. A L I::' I I... E $ . ~,- C I-.I E v R 0 N D a H ,,.'"' [ii X '[' E N ..,~:' I 0 N E X P L.. 0 R A l" I 0 N :~: E-" X X 0 i'-..t f'i A R A "f' I.-I CI N i: H Ct B I !_ :~ I::' I"11 L I.. I I"' ,.. I::' B W E L.. I.. F:' I L.. EL S I;..' & D ~ BPX · ,,-,".',':TA'I'E OF' ALAS'I(A 'i"E X A C 0 ARCO ALASKA, INC~ F'.O. BOX i00360 ~ ANCHORAGE, ALASKA 995._ DATE' REFERENCE' ARCO CASED HOLE FINALS i -7 i ,3-i S-9~ COLLAR 4-5 9-i3-9¢, PERF RECORD 5-i4 i~--i2-9'~ CCI. PERF RECORD 7-2S i (~-2 t -9£~, COLi_AR/PERF 9-44 i ¢,-".2,2,- 9 () CBT 9-44 t ~3 - 2 ~3' -' ":.;~ ~ CET i i -9 i (~-'8--9(~ F'ERF i 4- i 9-2'-9;3 COt. LAR i ~-6 i (~-" i 9--9(~' COLL. AR/PERF i., ,~ i ('}-i 9-9':Z:' GR/CCL i =:- :, - '"q'" _, i 6 i ~""'-2('} 9(') COI...L~.,' TBG CUTTER i_.~-i 6- i ,':;_"~'~_o,.:;,, ,,.~-. ; ... CCL/TBG C~.~ITTER i_- =: - '2 i i (']'., - i.,. =~' - ~, ":',, F' EL' R F:' R E C_ O. R D i aS -2 ,'2 i E:' -'2 '2 - 9 ;.i) C: 0 L t.. A R ," P E R Fr · ..... [,. i:,c:' _ i i c;, - ~."~ ..,':~' -'~, ":~,, P E R F' R m.., 0 R D Pi_EASE SIGN RECEIVED Bi:' AND F.:F'F[JR.N THE A'I""i'ACHI'ZD COI::"F HAVE A NICE DAY! ::7 A L_ L Y H 0 F:' F:' E C' 1< Er F;.' ATO_~ ,::.' '~, o , _.-' .'...' RUN i , 5' RUN t, 5' RUN i , 5' RUN t, .5 ' RUN i, 5' RUN i , 5' RUN i, ..,.=~" RUN i, 5' RLJN i, 5" RUN i, 5' RLJN i , 5" I~UN t, ~.' RU~,! i, 5:" RUN i, 5 ' ...... AS Rt::'CEiP[ [iF' DA'¥'A~ I'~L.$ FiLS FILS AFLAS SCH S C H I-tLS HLS ATLAS ATLAS A't-LA,S' A'i-I_AS I.-I L 57 A f'!_AS HI_~-: DtSTRIB!JTION ~ CENTRAl_ FII_E$ ~: C H E V R 0 N D & M · "' E X 1" Ei'~. ;:_," I Fi N E:XPL. ORATI ON - EXXON MARATHON · ~' MOBIL_ * THE AF'I~: FOR i-7 IS 50-(~29=2-~i57. ** THE AP l~ FOR i 5-2i IS 5-~-¢~29-2'.r950~. PHILLIPS PB WELL F'II_ES I;,' -& D BPX STATE OF ALASKA TEXACO RECEIVED NOV 0 1 1990 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA '~-~' ~ '~ ALAbr~ OIL AND GAS CONSERVATION COMMISb~ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown__ Stimulate X Alter casing Repair well X Pull tubing X Plugging m Re-Perforate X Other X Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 9951O 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 1278' FNL, 431' FWL, Sec. 19, T11N, R15E, UM At top of productive interval 870' FNL, 1581' FWL, Sec. 30, T11N, R15E, UM At effective depth 2299' FNL, 1715' FWL, Sec. 30, T11N, R15E, UM At total depth 2331' FNL, 1722' FWL, Sec. 30, T11N, R15E, UM 6. Datum elevation (DF or KB) 55' RKB 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number 18-11 9. Permit {qumber/approval number 87-87 ! 90-712 10. APl number 50-029-211 81 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical Effective depth: measured true vertical 11927' 8983' 11886' 8958' feet Plugs (measured) feet feet Junk (measured) feet 2900'-2211' plugged w/587 sx CSII 2525'-2257' plugged w/230 sx CSII None Casing Length Size Conductor 8 0' 2 0" Surface 2462' 1 3-3/8" Intermediate 1 1025' 9-5/8" Liner 11 64' 7" Perforation depth: measured 11 752'-11 780' Cemented 1900# Poleset 2400 sx CS III & 400 sx CS II 1000 sx Class G & 300 sx CS I 300 sx Class G Measureddepth True verticaldepth 110' 110' 2500' 2500' 11062' 8437' 10763'-11927' 8232'-8983' true vertical 8875'-8892' Tubing (size, grade, and measured depth) 3-1/2", L-80, tbg w/tail @ 1O803' Packers and SSSV (type and measured depth) Otis 'FMX' sssv @ 2187', Baker 'DB' pkr @ 10700' 13. Stimulation or cement squeeze summary Intervals treated (measured) Perforations f/ 11646'-11776' Treatment description including volumes used and final pressure 80 bbls 15% HCI, 15 bbls 12% HCI, and 45 bbls Class G cmt 14. N/A Prior to well operation Subsequent to operation Re_Dresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments None Copies of Logs and Surveys run _ Daily Report of Well Operations __ 16. Status of well classification as: Water Injector__ Oil X Gas . Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev Title Drilling] Analyst SUBMIT IN DUPLICATE ARCO Oil and G,,..., Company Well History- Initial Report- Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. State AK District ARCO ALASKA IN'C o ICounty, parish or borough . NORTH SLOPE Field PRUDHOE BAY I[eaee or unit ADL: 28326 Auth. or W.O, noAs3871 ITM WORKOVER API: 50-029-21181 Operator ARCO Spudded °r W'O'Ab~'PT IDate 9/10/90 IH°ur Date and depth as of 8:00 a.m. 09/10/90 ( TD: 0 PB:11886 SUPV:DAC 09/11/90 ( TD: 0 PB:11886 SUPV:DAC 09/12/90 ( TD: 0 PB:11886 SUPV:DAC 09/13/90 ( o SUPV: RWO PB:11886 SUPV: RWO 09/15/90 ( TD: 0 PB:11886 SUPV:RWO Complete record for each day reported 2) 3) 4) 5) 6) The above is correct , Sig nat u re ~'~d~.j~_... For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. JARCO W.I, 22. 0000 Prior status if a W.O. 0500 HRS AUDI 4 R/U TO KILL WELL 7"@11927' MW: 0.0 FIN MOVING RIG F/ DS 12-29 TO DS 18-11. ACCEPT RIG @ 0500 HRS 9/10/90. R/U LINES TO KILL WELL DOWN PRODUCTION FLOWLINE. DAILY:S63,895 CUM:$63,895 ETD:S63,895 EFC:$1,100,000 L/D TUBING 7"@11927' MW: 8.5 Seawater R/U TO KILL WELL. CIRC 8.5 PPG SEAWATER AROUND, WELL DEAD. PUMP 150 BBLS DIESEL DOWN PRODUCTION FLOWLINE. SET BPV, N/D TREE, N/U & TEST BOPS. TEST 9-5/8" PACKOFF TO 2800 PSI. P/U SPEAR & ENGAGE TBG. SHEARED SEAL ASSEMBLY FREE W/ 170,0009 PULL. L/D TBG HANGER. REVERSE OUT 2 DRILL PIPE VOLUMES. SPOT 50 BBL HEC PILL ON BOTTOM. POOH & L/D 3-1/2" TBG. DAILY:S26,484 CUM:$90,379 ETD:S90,379 EFC:$1,100,000 POOH 7"@11927' MW: 8.5 Seawater FIN L/D TBG. INSTALL 3-1/2" RAMS, ATTEMPT TO TEST RAMS. TEST PLUG LEAKING. DUMP GEL ON TOP OF TEST PLUG. TEST RAMS TO 5000 PSI. TEST ANNULAR TO 2500 PSI. SET WEAR BUSHING. P/U FTA #2 & RIH. SPOT 50 BBL HEC PILL. ENGAGE PBR W/ SPEAR. ROTATE PBR OUT OF PACKER. POOH. DAILY:S27,222 CUM:$117,601 ETD:S117,601 EFC:$1,100,000 MILLING ON SCOOP GUIDE 7"@11927' MW: 8.5 Seawater POOH, SLIP & CUT, FIN POOH. DID NOT RECOVER PBR. CHANGE GRAPPLE & RIH. ENGAGE OVERSHOT, ATTEMPT TO RELEASE PBR, NO SUCCESS. POOH. M/U MILL & OVER SHOT ASSEMBLY. RIH, SLIP & CUT, ADJUST BRAKE BANDS, FIN RIH. TAG PBR @ 10672' DRESSING OFF TOP OF PBR W/ MILL. DAILY:S29,684 CUM:$147,285 ETD:S125,000 EFC:$1,122,285 RIH W/ BHA #6 7"@11927' MW: 8.5 Seawater MILL ON PBR SCOOP HEAD. POOH. HELD BOP DRILL & SPCC DRILL, RIH W/ SPEAR. ATTEMPT TO RELEASE K-ANCHOR & PBR. POOH, NO RECOVERY. M/U BHA #6 (MILL & OVERSHOT) & RIH. DAILY:S26,660 CUM:$173,945 ETD:S125,000 EFC:$1,148,945 CIRC OUT GAS / OIL 7"@11927' MW: 8.5 Seawater RIH W/ BHA #6. MILL OVER SCOOP GUIDE ON PBR, ENGAGE PBR W/ OVERSHOT. ATTEMPT TO FREE PBR, NO SUCCESS. RELEASE OVERSHOT & POOH. RIH W/ BHA #7 (WASHPIPE & BURNING SHOE). WASH OVER PBR & MILL PACKER. PUMP 50 BBL HEC PILL WHILE MILL. CIRC OUT GAS FROM BELOW THE PACKER. CONT'D CIRC OUT GAS, OIL, HEC PILL TO JUNK TANK. DAILY:S27,629 CUM:$201,574 ETD:S150,000 EFC:$1,151,574 Drilling Supt. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not Jess frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ARCO ALASKA INC. Field PRUDHOE BAY Date and deptl~ Complete record as of 8:00 a,m. 09/16/90 ( TD: 0 PB:11886 SUPV:RWO 09/17/90 ( TD: 0 PB:11886 SUPV:RWO 09/18/90 ( TD: 0 PB:11886 SUPV:RWO 09/19/90 ( TD: 0 PB:11886 SUPV:RWO 09/20/90 ( TD: 0 PB:11886 SUPV:RWO 09/21/90 ( TD: 0 PB:11886 SUPV:RWO 7) 9) 10) 11) 12) The above is correct Sigr~t~ex ~\ ~ For form%' preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ICounty or Parish NORTH SLOPE Lease or Unit DS 18-11 JState AK I Well no. for eacA~l~vhiJ~ drilling or workover in progress RIH W/ SPEAR 7"@11927' MW: 8.5 Seawater FIN CIRC OUT GAS. WELL STABLE. FIN MILLING OVER PKR. CBU. POOH. M/U BHA #8 (OVERSHOT ASSBY). RIH, TAGGED & ENGAGED FISH. POOH, HELD SAFETY MTG, FIN POOH. L/D PBR & PART OF K-ANCHOR. RIH W/ BHA #9 (SPEAR ASSEMBLY). DAILY:S27,342 CUM:$228,916 ETD:S180,000 EFC:$1,149,006 RIH W/ MILL 7"@11927' MW: 8.5 Seawater RIH W/ SPEAR. ENGAGE FISH @ 10,754' POOH, RECOVERED PACKER & TAIL PIPE ASSEMBLY. M/U BHA #10 & RIH. TAGGED COIL TBG FISH @ 11,608'. ENGAGED FISH & POOH. RECOVERED 27.20' OF COIL TBG, DRILLEX MOTOR, UNDERREAMER, ROPE SOCKET & FINGER GUIDE. RIH W/ MILL TO CLEAN OUT TO PBTD. DAILY:S32,963 CUM:$261,879 ETD:S261,969 EFC:$1,100,000 JARRING ON sTuCK PIPE 7"@11927' MW: 8.5 Seawater RIH W/ MILL. TAG FILL @ 11,359' WASH AND REA/Vi TO 11,864'. DRILL HARD CMT TO 11878' PUMP 50 BBL HEC PILL, CIRC BOTTOMS UP. POOH (2) JTS, PIPE STUCK. WORK PIPE FREE. POOH (3) JTS, PIPE STUCK @ 11662'. PUMP 50 BBL HEC PILL, LOSING FLUID. BULLHEAD 165 BBLS DOWN BACKSIDE. JARRING UP & DOWN ON PIPE W/ PARTIAL RETURNS. DAILY:S61,232 CUM:$323,111 ETD:S323,201 EFC:$1,100,000 RIH TO JAR ON FISH 7"@11927' MW: 8.5 Seawater JAR ON STUCK PIPE. R/U HALIBURTON. SPOT 35 BBLS 15% HCL + 2 GAL/MBBL LOSURF 300 + 0.3% HAI-85 LET ACID SOAK WHILE JARRING ON PIPE. BULLHEAD ACID AWAY W/ 225 BBLS SEAWATER. R/U ATLAS E-LINE + 500 GR STRING SHOT (APRS). BACKED OFF PIPE AT 11,662' R/D ATLAS. POOH W/ DRILL PIPE, LEFT MILL, BIT SUB & (2) JUNK BASKETS IN HOLE. RIH W/ JARRING ASSEMBLY. DAILY:S47,696 CUM:$370,807 ETD:S330,000 EFC:$1,140,897 POOH 7"@11927' MW: 8.5 Seawater RIH W/ JARRING ASSEMBLY. SCREWED INTO FISH & JARRED FISH FREE. POOH W/ FISH. RIH W/ BIT. CIRC & COND. POOH. DAILY:S33,048 CUM:$403,855 ETD:S370,000 EFC:$1,133,945 SQUEEZING PERFS 7"@11927' MW: 8.5 Seawater SERVICE RIG. POOH W/ BIT. P/U 7" RTTS & RIH. SET RTTS @ 11603'. TEST CSG TO 3000 PSI FOR 30 MIN. EST INJECTION RATE INTO PERFS F/ 11,646' TO 11,776', 3 BPM & 1000 PSI. RELEASE RTTS & POOH. HELD BOP DRILL & SPCC MTG. FIN POOH. RIH W/ 2-7/8" STINGER & 3-1/2" DRILL P~E. SPOT 30 BBLS 15% HCL, 15 BBLS 12% HCL-3% HF, & 15 BBLSIbI~L ACID. BULLHEAD ACID INTO PERFS W/ 225 BBLS SEAWATER @ 5 BPM & 1800 PSI. RIH TO 11,843'. BATCH MIX CL "G" CMT (230 SX) DAILY: ~ ' $4~a~98% \~CUM:$44 t~43 ETD:$448,243 EFC:$1,100 000 · ' ' Drilling Supt. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field Date and depth as of 8:00 a.m. l County or Parish ARCO ALASKA INC. I NORTH SLOPE I Lease or Unit PRUDHOE BAY t DS 18-11 Complete record for each day while drilling or workover in progress AUDI 4 09/22/90 ( 13i TD: 0 PB:11886 SUPV: DRU 09/23/90 ( 14 TD: 0 PB: 11886 SUPV: DRU 09/24/90 ( 15 TD: 0 PB:11886 SUPV: DRU 09/25/90 ( 16 TD: 0 PB:11886 SUPV:DRU lState AK JWell no. DRLG CMT SQUEEZE @ 11774' 7"@11927' MW: 8.5 Seawater SPOT 45 BBLS CL 'G' CMT F~ 11845' TO 10705' POOH TO 9996'. HOWCO SQUEEZE PERFS F/ 11646' TO 11776' W/ 45 BBLS CL 'G' W/ 1% BENTONITE, .5% CFR-3, 1.75 GPS FDP-434A, .26 GPS FDP-434B, .005 GPS D-AIR 3 AND .2% HR5. YIELD 1.1, 16.1 PPG, 2.615 GPS WATER, FLUID LOSS 38 CC/30 MIN. SQUEEZE 25 BBL OUTSIDE CSG. R/D HOWCO. POOH W/ DP. TIH W/ BHA #16 TO 10673'. MU HOWCO 9-5/8" RTTS. ND BOP. NU BOP. TEST TO 5000 PSI. OK. RELEASE STEAM VALVE AND RTTS. L/D SAME. RIH W/ BIT. TAG CMT AT 11419'. DRLG CMT F/ 11419' TO 11774'. DAILY:S60,871 CUM:$509,024 ETD:SO EFC:$1,609,114 L/D 2-7/8" WS. 7"@11927' MW: 8.5 Seawater DRLG CMT F/ 11744' TO 11874'. CIR 50 BBLS HEC SWEEP. TEST SQUEEZE TO 1500 PSI. REVERSE CIRC. PLUGGED BIT. CLEAR BIT. PUMP 100 BBLS HEC SWEEP. POOH W/ 3-1/2" DP. L/D 14 JTS. POOH. L/D BHA #16. TIH W/ 6-1/2" DC. POOH. TIH W/ 2-7/8" WS. POOH. L/D SAME. DAILY:S26,528 CUM:$535,552 ETD:SO EFC:$1,635,642 L/D DRILL PIPE. 7"@11927' MW: 8.5 Seawater SERVICE RIG. POOH, L/D 2-7/8" WS. ND FLOW NIPPLE. NU PERF FLANGE. RU HLS W/L LUB. TEST TO 1500 PSI. RIH W/ 20', 4-1/2" PERF GUN. PERF F/ 11760' TO 11780' W/ 4SPF, 180 DEG PHASING. POOH. PU AND RIH W/ 8' PERF GUN. PERF F/ 11760' TO 11752' W/ 4 SPF, 180 DEG PHASING. RD HLS AND LUB. NU FLOW NIPPLE. RIH W/ BAKER 9-5/8" X 3-1/2" MODEL D PACKER. DROP BALL. SET PAKER AT 10700' W/ 2300 PSI. SHEAR OUT PACKER. TEST CSG AND PKR TO 3000 PSI. POOH W/ 3-1/2" DP. DAILY:S50,708 CUM:$586,260 ETD:SO EFC:$1,686,350 RIH W/ 3-1/2" CA. 7"@11927' MW: 8.5 Seawater SERVICE RIG. LAY DOWN 3-1/2" DP AND PULL WEAR RING. RU CAMCO TO TIH W/ 3-1/2" CA. MU BAKER LOCATOR SEAL ASSY ON 3-1/2" 9.3# L-80 EUE-MOD TBG. CAMCO CIM TEST LINE TO 5000 PSI. TIH INSTALLING MODIFIED RESOURCE TECH CLAMPS ON TBG. ATTEMPT TO INSTALL ISOLATION SLEEVE IN OTIS SSSV. MU SSSV. TEST CONTROL LINE TO 5000#. TIH W/ 3-1/2" CA. DAILY:S237,811 CUM:$824,071 ETD:S0 EFC:$1,924,161 The above is correct Signature % For form ~repa~'ation a-n'~'~i~tribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ARCO Oil aP,., Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I !Accounting cost center code District ICounty or Parish State ARCO ALASKA. INC. I NORTH SLOPE AK Field ILease or Unit Well no, PRUDHOE BAY I ADL: 28326 DS 18-11 Auth. or W.O. no, ]Title AS 3871 I WORKOVER API: 50-029-21181 Icost center prior to plugging and this ARCO 22. 0000 labandonment of this well Spudded or W.O. begun Date IHour Prior status if a W.O. ACCm. PT 9/10/90 / 0500 HRS Date and depth as of 8:00 a,m. 09/26/90 ( 17) TD: 0 PB:11886 SUPV:DRU Old TD Complete record for each day reported AUDI 4 RELEASE RIG @ 1930 HRS, 9/25/90 7"@11927' MW: 8.5 Seawater FIH W/ 3-1/2" CA. LOCATE AND STUNG INTO BAKER 'DB' PACKER AT 10,700' PRESS TBG TO 500#. INSTALL MCEVOY GEN III TBG HGR. CONNECT CIL AND SSSV CONTROL LINES. TEST TO 5000#. FREEZE PROTECT WITH 168 BBLS DIESEL W/ C-120. STUNG INTO PKR. NOT SPACED PROPERLY. RESPACED AND RETEST. CONNECT CIL AND CONTROL LINE TO TBGHD SPOOL. TEST TO 5000#. TEST TBG AND ANNULUS TO 3000#. OK. LD LANDING JT. SET BPV. ND BOP. NU TREE. TEST PACKOFF TO 5000#. PULL BPV. TEST TREE TO 5000#. PULL TEST PLUG. PRESS ANNULUS TO 1000#. PRESS TBG TO 3800#. SHEAR BAKER SHEAR OUT SUB. SET BPV. RELEASED RIG @ 1930 HRS, 9/25/90. OTIS FMX SSSV @ 2187' DAILY:S69,890 CUM:$893,961 ETD:SO EFC:$1,994,051 New TD Released rig Date Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s} Potential test data IPB Depth Kind of rig Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length ; i ,.Choke~size T.P. ~ C.P,~~-- Water % ' GOR!' . ~ Gravity Allowable Effective date corrected The above is correct ~ ._h uriiiing ~uPi, For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon_ Suspend _ Operation Shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate X Change approved program _ Pull tubing ~ Variance _ Perforate ~ Other X 2. Name of Operator 5. Type of Well' 6. Datum elevation (DF or KB) Development X ARCO Alaska, Inc. Exploratory _ RKB 55' feet 3. Address Stratigraphic _ 7. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 Service _ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1278' FNL, 431' FWL, Sec. 19, T11N, R15E, UM 18-11 At top of productive interval 9. Permit number 870' FNL, 1581' FWL, Sec. 30, T11N, R15E, UM 87-87 At effective depth 10. APl number 2299' FNL, 1715' FWL, Sec. 30, T11N, R15E, UM 50-029-211 81 .. ,~.. At total depth 11. Field/Pool Prudhoe Bay Field 2331' FNL, 1722' FWL, Sec. 30~ T11N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 1 1927' feet Plugs (measured) 2900'-2211' plugged w/ 587 sx CS II true vertical 8983' feet 2525'-2257' plugged w/ 230 sx CS II Effective depth: measured 11886' feet Junk (measured) None true vertical 8 958' feet Casing Length Size Cemented Measured depth True vertical depth Conductor 8 0' 2 0" 1900# Poleset 1 1 0' 11 0' Surface 2462' 1 3-3/8" 2400 sx CS III 8, 2500' 2500' 400 sx CS II Intermediate 11 025' 9-5/8" 1000 sx Class G & 11 062' 8437' 300 sx CS I Liner 11 64' 7" 300 sx Class G 10763'-11927' 8232'-8983' Perforation depth: measured 11646'-11656', 11664'-11674' true vertical 8809'-8816', 8820'-8827' Tubing (size, grade, and measured depth) S' P 6 1990 3-1/2", L-80, tbg w/tail @ i1382' Alaska 0il & Gas 60ns. Packers and SSSV (type and measured depth) ^~chorage. ,Camco 'TRDP' sssv ~ 2211'~ Baker 'BOT' pkr ~ 10711' 13. Attachments Description summary of proposal X Detailed operation program _ BOP sketch ..~ 14. Estimated date for commencing operation 15. Status of well classification as: 9/10/90 Oil ~ Gas ~ Suspended _ 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true 'and' correct to the best of my knowledge. ~: Signed (~!~ ~ _.~.b~cA_~' Title Drilling Analyst Date FOR COMMISSION USE ONLY Conditions approval: Notify Commission so representative may witness IApproval No. Plug integrity_ BOP Test_ Location clearance__ I ¢~:2 ..--72 ~-. Mechanical Integrity Test ~ Subsequent form require lO- ORi61NAL SIGf~!ED B~ Iq( Approved by the order of the Commission I f'I~NIE P,. SMITH Commissioner Date ~ Form 10-403 Rev 06/15/88 Approved Copy IReturned SUBMIT IN TRIPLICATE DS 18-11 WORKOVER Fish 15' CT AND UR, Run 3-1/2" Completion Pre-Rig 1. RU slickline. 2. Set BPV. Prq)Gedure , o . . . . . , 10. 11. 12. 13. 14. 15. 16. Operations: Pull RKED dummy from lowest GLM @ 10589' MD. RD slickline. MIRU NABORS 2ES. Pull BPV. Alaska. 0g & Gas Col~s. Anch0rag~ ' Kill well with seawater by circulating down the tubing and up the annulus. Set BPV. ND tree, NU BOPE. Pull BPV, set test plug. Test BOPE to 5000 psi. Pull test plug. MU spear. Pull tubing hanger to floor. CBU. POOH, LD 3-1/2" tubing. Tubing and all completion accessories should be sent to Tuboscope for inspection. Fish the PBR and seal assembly. MU 8-1/2" packer mill w/PRT and RIH. Mill and latch BOT 3H packer. CBU. POOH, LD packer and tailpipe. MU fishing assembly for 1-1/2" coiled tubing. RIH and wash over fish (expandable bell guide, 1 of 1-1/2" CT and underreamer) ~ 11608' SLM. POOH and LD fish. Rill with a 9 5/8" RTTS to top of 7" liner and pressure test the 9 5/8" casing to 3000 psi. Relea: R~S a~ POOH. RIH with 2-7/8" stinger on DP to top of fill. Perform an acid wash across the pedorations. Spot a balanced plug across the pedoration interval, pull out of the cement and squeeze the perforations. POOH. MU 6" bit with 7" and 9-5/8" casing scrapers on DP and RIH. Clean out 7" liner down to PBTD 11886' MD. CBU. POOH and test squeeze to 1500 psi. Perforate Zone 1 from 11750' - 11778' MD , FSD and oriented for frac. Run 9 5/8" packer with 3-1/2" tubing tail assembly on DP. Set packer ~ +/- 10700'MD. Test 9 5/8" casing above packer to 3000 psi. POOH, LD DP. MU seal assembly and 3/8" treater string on 3-1/2" tubing and RIH. Install GLM's as per gas lift design and SSSV. Sting into packer and pressure test. Space out and MU hanger. Freeze protect 2200' of tubing and casing. Land hanger, RILDS. Pressure test tubing and annulus to 3000 psi. Set BPV. ND BOPE, NU tree. Pull BPV and set test plug and test tree to 5000 psi. Pull test plug. 17. Fish DS 18.11 15' CT AND UR, WORKOVER Run 3-1/2,, ComPletion release rig. Well Will be stimulated ov ~ 8800' TVD (8.1 and reperforated after rig mOves off the Well. u,5 ppg seawater ppg EMW) RECEIVED S E P - 6 1990 &laska .Oil & Gas Co,is, ~nchora9{t 5000 PSI BOP STACK I I ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 3 1.13-3/8" CASING HEAD 2.9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4.13-5/8" - 5000 PSI BLIND RAMS 5.13-5/8" - 5000 PSI PIPE RAMS 6.13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST All COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS, FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 8/4/89 REVISION OF11/21/86 BOP SCH (FOR:AUDI 4,NORDIC 1) STATE OF ALASKA ALASKA ' AND GAS CONSERVATION C APPLICA, ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 1278' FNL, 431' FWL, Sec. 19, T11 N, R15E, UM At top of productive interval 1795' FNL, 1627' FWL, Sec. 30, T11N, R15E, UM At effective depth 2282' FNL, 1797' FWL, Sec. 30, T11 N, R15E, UM At total depth 2314' FNL, 1804' FWL, Sec. 30, T10N, R15E, UM 6. Datum of elevation(DF or KB) 55 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 18-11 9. Permit number 87-87 10. APl number 50 - 029-21181-01 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11927 feet Plugs(measured) 8983 feet Effective depth: measured 11886 feet true vertical 8958 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1900# Poleset 110' 110' Sudace 2462' 13-3/8" 2400 sx CS III & 400 sx CS II 2500' 2500' Production 11025' 9-5/8" 1000 sx CI 'G' 11062' 8435' Liner 1164' 7" 300 sx CI 'G' 11927' 8983' Perforation depth: measured 11646-11656'; 11664-11674' R E ~ E ~V E true vertical 8809-8815'; S820-8827' AUG ~ 9 Tubing (size, grade, and measured depth) 3-1/2", L-80, 9.3#, PCT @ 11382' MD Alaska 0ii & Gas Cons, Packers and SSSV (type and measured depth) Baker BeT 3-H packer @ 10711' MD; Camco TRDP SSSV @ 2211' MD 13. Attachments Description summary of Proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation September 1990 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregg.[ng is true and correct to the best of my knowledge. Signed Title 15. Status of well classification as: Gas Suspended Sr. Area Operations Engineer Date FOR COMMIR~ION URI= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test ~ Subsequent form required 10- J Approval No.~,O_ ORIGINAL SIGNED 9¥ I n~fKllF Approved by order of the Commissioner ' C. SMITH Form 10-403 Rev 06/15/88 Approved Copy O~_Returned /Commissioner SUBMIT IN TRIPLICATE 515 RAC c: J. Gruber, ATO-1478 SH ARCO I · . . o 5. Drill Site 18-11 Zone 1 Fracture Treatment Preliminary Procedure Alaska Inc. proposes the following procedure: This procedure commences after the Rig Workover and reperforations. Perform perf breakdown treatment using ballsealers to open all perforations in the perforated intervals 11750'-11778' MD (referenced to BHCS Icg dated 9/12/87), Pump fracture treatment to above intervals using gelled water and intermediate strength proppant at 20 bpm. Preliminary pump schedule is listed below. a. 120 bbl Prepad and shutdown. b. 250 bbl Pad c. 110 bbl Slurry at 1-10 PPG d. 109 bbl Flush RDMO fracturing service company. Cleanout excess proppant to PBTD with CTU if needed. Place well on production. EIVED AUG 2 9 1990 Alaska 0il & Gas Cons. Commission Anchorage 6 5 4 3 2 Ala~ COILED TUBING UNIT BOP EOu I PMEN? 1. ~K)O0 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYD~ULK~ SLIPS 4. ~X)O PSI 4 1/6" SH£AR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS -6.5000 PSI 4 1/16" STUFFING BOX 2 RECEIVED AU G 2 9 1990 ka,Oil & Gas Cons. Anchorage H]REL ]NE BOP EOU ] PMENT 1. 5000 PSI ?" WELLHEAD CONNEC10R FLANGE 2. 5000 PSI WIRE:LINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSi 4 1/6" FLOW TUB[ PACK-OFF ALAi:KA: INC~ BOX ~ ':3(')366' .;....~ Ct,: R A G E: ,~, L~. ~. A 995 ~ '::) R Iii: g:' FL R E ix! C E: A R C 0 C A 5; E D H 0 L E F .,. N A L_ E-; -' 2 6 '7 --- 4 -- 9 ':"::, F' R 0 D U C: "[' ! t') i"-! P R 0 F' I L.. iZ -' i 9 '7 - ,:2: '- 9 ""'...' F' R 01":' U [": 'f' I 0 f'! f:' R 0 l':' .[ L E · - S ,' i - c;:,'.'; ' ~::' "' '/ D .... i' -"-.- 1 ....... ~.-rl, E. T E F.' ~ f'i · - 'i :.~ '7 "- 7 "- 9,:.:.:, I N J E C T ! ('.)i"J F' [::: i'3 F:' .[ t.. .... i 8 7 .... 6- 9,:[i:, I N,.J E C T I 0 i"'.! F:' R 0 F:' )' L.. E - S 2 7 - 'i 'i .- ':J;' ,::) F:' F;.: 0 D U C 'i" i 0 N F:' R ("J l::' .[ i.. lie ..... · ':38 -/- ~ 2 -' "::;' ":'-' T i"'.J, i~'r:T i FiN F:'i:i'.C',F' il I::' ., ,... .!, . -- ~ ...... 2 '-' i 2 7 - 'i..'::,,... .... c.:,, .":;.., F:' l:;.', f"~ .... D U C 'i" ]' ......"": ~',i,, F' R 0 F:' i ,_i ,..':"' 2 - -i. 6 ? - 6 -' '::", "?'.:. L.. ,...r': A K D E: "f E r',... T. I 0 N 8-22 7-4-9¢;, C.F.: ._.,.,,_,_,,.r'-,'~s i ,:':,i:;,, 6 .-- 22; 7 .... :-,:; ._ c.:, ;:; ,:,;" I:;..' C 0 L. L.. A R 8-i i 7 .... 8-9,:::, LEAK DF.:TE:C.'I'ION/F'IT.':'-.-? F;.: LJ N i:;.: U N Fi: i.j t...! i:;.: i..j f...! i R i..it,.! i i:;..' U i'..i, i R U i"'!i F;..' t.J i'4 H.'. U i'! ! F:.:U N i F;:. U i".! F:' L E A 5..' r.i: :~.' l L';- N R iii C E i V ED B Y A i'.J._T:: R E T U R N T,,~-.: .... ~::' A 'i" 7' A C l.-i E. D t..:~ r. '::"' R. I::: C ii: i F:' T 0 F' D A T A I-!AVE A N]:CIi-" DAY! ;~: A!.. t... Y I-tOFFEC:K EF.: ATO.- i 529 II 11 I1 D i 2 T R :t: B U T ]: ('3 N · "- H L i · ,- F' .i: 1_ F'S F:'B bJEL. L. F' ]: i... !::. :5' R ,.:'.,D · "' BF'X 11° . · ~: ,S"i'A]"Iz' OF r:~I...A;:->'i(A ]" r:i: X A C (;J Oil & Gas Cons. Anchorago. ? ARCO ALA£,'KA, INC. F'. 0. BOX i ,3,6'.56'3 ANCHORAGE, ALASKA 995t'3 DATE' 5124190 RECEIVED MA ¥ 2 9 7990 Oil & Gas Cons. ',,ummi io REFERENCE' ARCO CASED HOLE FINALS t -7 4-6-9(.~ COLLAR i - ~ 0 5- ~ 6-9('} COLI_AR · ~ _ o c, '~ - ~ .5 - 9 ~ G A M M A KEUOix~ 2-'29A 5-i 7-96' PERF -' -~ "'" 4'-S 5-t S-90 COLLAR 6-4 5- t 8-90 COLLAR t~.'~-°t.= 5-i 2-90 PERF RECORD t :3-t (3 5-25-9~3 TRACER CHECK i~-°.,. 5-t 4-90 COL~- AR ~ 7'-'7 4-6-96, PERF t8-tt 5-tS-90 PDK-tO0 G/R. t 8-24 5-t 2-90 PDK-t O0 G/R RUN t ,..,q' I;;UN. i, 5' R U N I;:tJN i, 5" RUN t , .,. RUN i , .5' RUN t, 5." RUN i , 5 ' RUN t, J'":'" I;:UN t, 5' RLJN RUN t , 5' F'L. EA.: E SIGN RECEIVED BY AND R~-IE:D. HAVE A NICE DAY! SAL. LY FIOFFECKER AT0-i529 COPY AS' RECEIPT OF DATA, AF'F'ROVED~~ I'I;:AN$~ 98i 99 HAL A f'l_ A :--:.' HAL £CH A 'f' L. A'f'LAZ 5'CH I-t¢,1_ ATLA;~.' HAL A'FLA.? ATLA~ DISTRIBUTION · ' CENTRAL FILES ' · ,,-~ CHEVRON ...~ EXTENSION E. XFLORAITON -.- EXXON MARATHON .' MOBIL PHILLIPS F'B WELL F']:LE~£ R & D BPX STATE OF ALASKA TEXACO ARCO Alaska, Inc2 " Prudhoe Bay LL _..neering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager December 8, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 18-11, Approval No. 8-680 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/MJB/jp Attachment CC: J. S. Dietz, BP J. Gruber, ATO-1478 PI(DS 18-11) Wl-3 RECEIVED Alaska Oil & Gas Cons. C0.mmissI~ ,~chorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--.6132-C STATE OF ALASKA ALASKA ¢'-"AND GAS CONSERVATION REPORT (.,,-' SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing ~ Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, 431' FWL, Sec. 19, T11N, R15E, UM At top of productive interval 870' FNL, 1581' FWL, Sec. 30, T11N, R15E, UM At effective depth 2282' FNL, 1797' FWL, Sec. 30, T11N, R15E, UM At total depth 2331' FNL, 1772' FWL, Sec. 30, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 55' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number ,ff- 9. Permit numbedapproval number 8 - 192/8 - 680 10. APl number 50 -029- 21181 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11927 feet true vertical 8983 feet Effective depth: measured 11886 feet true vertical 8958 feet Casing Length Size Conductor 80' 20" Su dace 2462' 13-3/8" Production 11025' 9-5/8" Liner 1164' 7" Plugs(measured) Junk(measured) Cemented 1900# Poleset 2400 sx CS III & 400 sx CS II 1000 sx CI 'G' & 300 sx CS I 300 sx CI 'G' Perforation depth: measured 11646 -11656'; 11664 - 11674' true vertical 8809 - 8816'; 8820 - 8827' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 PCT w/tail @ 11382' Measured depth True verticaldepth 110' 110' 2500' 2500' 11062' 8435' 11927' 8983' RE£EIV .D DEC 1_ Ii. 1~9 Nasta 0il & Gas Cons. Packers and SSSV (type and measured depth) Baker BOT 3H Packer @ 10711' MD; Camco TRDP SSSV @ 2211' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) SEE ATTACHED Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1542 11961 0 .... 1304 849 0 Tubing Pressure 1634 303 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~~ .~~4.~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 D.M. FIFE SUBMIT IN DUPLICATE DS 18-11 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR GAS SHUT-OFF 10/1/88: MIRU CTU & Stimulation Equipment. PT Equipment to 4000 psi. RIH w/CT and washed perforations at: 11646- 11656' MD Ref. Log: BHCS 9/12/87. 11664- 11674' MD 11686 - 11706' MD 11712- 11742' MD 11752 - 11758' MD 11762- 11776' MD Pumped the following treatment: 85 bbls 12% HC1 w/10% Xylene, followed by, 80 bbls 12-3% HC1-HF, followed by 44 bbls 12% HC1. Displaced w/Diesel. POH. Rigged down. 10/4/88: The Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4500 psi. RIH w / CT and fluid packed wellbore w/seawater. Pumped 30 bbls cement, squeezing perforations: 11646 - 11656' MD Ref. Log: BHCS 9/12/87. 11664- 11674' MD 11686 - 11706' MD 11712- 11742' MD 11752 - 11758' MD 11762 - 11776' MD Contaminated cement with 80 bbls contaminant. RECEIVED 10/5/88: Cleaned out contaminated cement from WB. 10/27/88: Reperforated: 11646 - 11656' MD 11664 - 11674' MD Ref. Log: BHCS 9/12/87. DEC l 1989 Alaska 011 & Gas Cons. Comml~lOff Anchorage Returned well to production and obtained valid production test. ARCO ALASKA, INC~ F:', O, BOX t (.) () S 6 (':) ANCHORAC;E, AL.A,~'KA 995t ,.. D A T E' ' 4 '" ''~ ~.6-89 F,'Ii:'F:I.X:F,'ENCE: ARCO F'RE$,S'URE DA FA .. 2 .... t0 4-'-t .... 89 BHP ..... ,.<,'TATIC GRADIENT Ol'I · 4-.29 2-22-89 BHF ........ FI...OW i N~ [~RAD.I~ENI' CANCO .5: - t O 3 --- 2 '? '"' 89 B I..I F: ....... S l' A l' I C G R A D I fi; N 'F C A H C (] 6 -- S 4 - t .'- 89 B H F ....... $ 'F A l' I C () R A D I E N T C A H C 0 i t - i 6 4--. i '7-8 9 B H F: ....... ,S' l'A l'I C (:; R A D I E N T C A H C 0 i t :'" i '7 4 - i '7 -' 89 B H F: ........ :~' ')" A T I C [; R A D I E N 'F C A M C C) tt .... t8 4-'t'7-"89 BHF: ....... STATIC GRADIENI' CAMCO t t '~ ...... . -' ~. 4 S --' 2 O-- 89 B I"1P S T A l' I C [; R A D I E N T C A M C 0 i' 2 '" t 8 4 - t 0 - 89 B I-'1F ......... ,S' T A l' I C G R A D I E N T C A M C 0 t2-'26 S--;~G-89 BHF ..... ~TAI'IC GI:~'.AD I ENT (]TI~ t :~'-~ 4--2-8? BHF: ....... $'I'AI'IC GRADIENT OTIS NS'-tO 4-3-89 BHF ...... STATIC GRADIEN'F O'FI~' t4--it 4--t -89 BHP ....STATIC GRADIENT (]'I'I,~' t 4-t 2 4---S-89 BHP--~'FATIC GRADiEN'F 0/"I$ t 4 -- 21 4-" 4- 89 B H F ...... ~' 7 A T I CC~ R A D I E N l' C A H C 0._ t 5-t OA 4-2-'8~ BHF'- .... ,S~'I"A'I'ICGRAD~EN'F CAMCO t5-t9 4 .... 2-89 BHF' .... SI'A'Y'IC GRADIENT CAHCO t5-22 4-2'-89 BHF ....... $'FA'FIC GRADIENT CAMCO ~5 .... 25 4-'~'"8~ BHF ....STATIC GRADIENT CAMCO t8-4 ~-29-89 BHP--$-I'ATIC GRADIENI' OTIS t8-8 S-'2~-'89 BHP- ..... ,S'TATIC GRADIENT CAHCO ~8-~t S"'30-8~ BHP--21'ATIC GRADIENF OTIS t8-17 S'"29-8~ BHF ...... STA'FIC GRADIENT CAHCO t8'-2~ ~-29-8~ BHF'--2TAFIC GRADIENT CAMCO F'I..EASE; SIGN AND REI'URN 'T'FIE AT"FACHED C.)FY"F ', ' A,~' RECEIF'T OF' DATA SAL. I-Y HOFFECKFR APF'ROVED _ I ~ ~ IRAN$. 891'77 A'FO- ~ 529 ~ 0ii & G~s 00H~. Oo~missio;I "" ' " Anchorage DISTRIBUI'ION CENTRAL FILES .,,-'"' r-"HII_LIF'$ CHEEVRON F:'B WEL. L_ F IL. ES · ,- D & M ..- R & D FXTEN$ I ON EXF'L. ORA'II ON ~'" BPX · ,,- EXX(]N '"' ,, $'FAI'E OF' ALASK(~ MARAI'HON ,..-"' I'EXACO · - MOBIL. Telecopy No. (907) 276-7542 _February 23, 1989 -- J B K ewin ~ Regional Drlg Eng ARCO Alaska, Inc P 0 Box 100360 Anchorage, AK 99510-0360 'Dear Jeff: A review of our files indicates the 'following two ARCO wells have improperly assigned AP1 numbers: Current API# _ · PBU DS ~8-11 ~pl~ 50-029-21181-01~ .................. -- Pt MclntYre 3 dpn 50-029-21779-01 _ ~ . Please make the necessary changes to your files. inconvenience. Sincerely, ......... Robert P Crandall Sr Petr Geologist Jo/B.RPC. 14 Revised API ~ 50-029-21181 50-029-21779 We regret any · · Tom Ooscermeyer - ARCO ~,RL;L. AI_AbI<A INC F'. O. BOX Ai'.J. CHORAGE, AL.A~'K A DATE' t t-4-88 REF'ERENCE: ARCO CASED HOLE FINALS ~ I -2 t (:~/t -2/88 ,-'-J i ;:;-24-88 ~"3- i., ~''' '! (:)-i 9-88 ~' 3- i 7 i ~.D/f -3/88 " S-i 9 i ()-2'7-88 ] ' ~ ~-I 9 1 0-27-88 ~':~ 7-3S ~"-i ': ' . o/ i 7-88 ~ 7-S4 9-i 6-88 ~ 9-2¢, t 0-3-8~q , ...,: ~. , ~- 88 ~' 9-S5 9-26-88 ~ i i-i i O--i-88 ~-,~ i q)-9'.~--88 i 2-9 9-i 9-88 ~ i 4-i 8 i ~:a.-7--88 ~ i ~ ........ .,--t (~A i t~-v--~s~ ~'i 5-i 9 i ¢,-.-8-88 ~ i.,~.-- 2i 9-3,3-88 ~i 7-6 9-14-88 FLUID DEN,S' I 'I"Y CNL-GAMMA VERT :[LOG TEMF' SURVEY COLLAR CCL-F'LUG £'ETTZNG [.'.El' COI_LAR/F'ERF COt_L. AR/F'E:'RF COLL. AR,'"PERF F' F;..' O D U C T .1; 0 N F' R 0 F' I L E INJE~CT ION F'R 0 f-" I L f-'~ INJECT ';ON PROFILE PRODUCTT. ON I:'ROFILF PROf)UCT T. ON PROF:'~ I_.E ,,,,. ,. ~ .... ~,~ C:OI_L. AR/F'ERF GAMMA-COLLAR GAMMA-CCL COLLAR F'RODUCTION PROF'IL.E COi..LAR/i'-:'ERF '~Si i~-'i i (.)-;'2--88 PITS ,--_i if.':,-2'?-88 CO l_ LAR,/E' L:- R. F e, F:' :A:-~'E SIGN ~',Ni) F;;ETUR. N i"W'E-A'i"TACHED COF'Y AS RE:CLiPT 01::' RUN '2, 5" RUN i , 5" RUN t , RtJN i, 5' F;.:LJNt , 5" RUN 1 , 5 ' RUN i RtJN t , 5" RUN i, 5 ' RUN I, ~'".." RUN i , 5 ' RtJN i, 5' RUN RUN ,3, 5' RUN RUN RUN i, 5 ' RUN t, 5 ' RUN i, 5 ' F;,'tJNi ,.,-~' RUN t , 5 ' R UN i , RUN t, ~ ' RUN 1 , ~" I) A T A, RECEIVED BY ...................................... HAVE A NICE DAY! SAI_I..Y HOF:F:ECK ER ATO- i 5:29 TRAN$ .$'3,. ~';' ..... .il. CENTRAL FILES CHEVR. ON ~ EX ..... ~' ,,. I E...t'.~ ION EXPLORATION · "' EXXf'IN MARATHON ,~ MOBIL P Ft 1' L. L I F' S F'B WELl_ FILES SAF'[' STATE 01:'- RI_A.S'I<A TEXACO C A M C O A I'I_A2 A 'f' L A,S.' C A i,i C 0 AT' 1... A .:':,' S C i-4 S C H G I:.:: A t:;: b E A R 6 IS A F;..' C A r,i C 0 C A M C 0 C A M E 0 C A M C: 0 C A M C 0 A T I_ A S' G E AR C A M C 0 CAMCO C A M C 0 .......... L; A f't U U G. E ,q F;.'. .......... L.: F-~ r,i L.; i...I A'I' I.. A S' THE:SE L.O(;;$ HAVE '7 .... 33 i 5-i ,,?,, A THE WRONG AP1 NOS' ON i"FIEM, ..;. ~.-) --':-3, ::.2 ~-'21 8,39 =~: q) ._ f:; ."~ c? ....-~ A '~' f':, i -- A t 1' H E C' 0 I';' R "- F.' "r · ..b._. NOS A R iE · ARCO Alaska, Inc. · Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 2, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS I8-.11 Permit No. 8-192 ) Dear Mr. Chatterton: Attached is the ApPlication for Sundry Approval detailing work performed on the above-referenced well. Very truly yours, D. F. Scheme DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, ATO-1478 PI(DS 18-1 i)Wl_3 to be RECEIVED ~EP -6 ]:988 Oil & g .... Corn:. Commissior~ WELLS3/20 ARCO Alaska, loc. is a Subsidiary of At~anticRichfieldCompany AR3B~6132_C 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM,,.,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ,~ Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 55' RKB feet 3. Address 6. Unit or Property name P.O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 1278' FNL, 431' FWL, Sec. 19, TllN, Ri5E, UM At top of productive interval 1795' FNL, 1627' FWL, Sec. 30, TllN, R15E, UM At effective depth 2282' FNL, 1797' FWL, Sec. 30, TllN, R15E, UM At total depth 2314' FNL, 1804' FWL, Sec. 30, T10N, R15E, UM 7. Well number 8. P~t, muT~e r--h, 9. APl number 50-- 029-2118 t-e'lr" 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 11927 feet 8983 feet Effective depth: measured 11886 true vertical 8957 Casing Length Size Conductor 80 ' 20" Surface 2462 ' 13-3/8" Production 11025 ' 9-5/8" Liner 1164 ' 7" feet feet Plugs (measured) Junk(measured) Cemented Measured depth 1900# Poleset 2400 sx CS III & 400 sx CS II 1000 sx Class G 300 sx Class G 110' 2500' 11062' 10763-11927' ~ue Verticaldepth 110' 2500' 8435' 8234-8983' Perforation depth: measured 11646-11656'; 11664-11674'; 11686-22706'; 11712-11742'; 11752-11758'; true vertical 8809-8815'; 8820-8827'; 8834-8846'; 8850'8869'; 8875-8878'; 8881-8890' Tubing (size, grade and measured depth) 3½", L-80, tubing with tail @ 11382' 11762-11776' RECEIVED SEP - i988 Packers and SSSV (type and measured depth) Baker SAB Packer @' 10711 ' MD; Camco TRDP SSSV @ 2211 ' MD Alaska 0ii &.Gas._._....C0ns. C0mmissi~ 12.Attachments Description summary of proposal ~ Detailed operations program © BOP 13. Estimated date for commencing operation October 1988 14. If proposal was verbally'approved Name of approver Date approved 15. I hereby~ertify tha~,,~he/~re,~g is true and correct to the best of my knowledge Signed C~//i~../,~'_~../~"~~_~./'~_~--- Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by Notify commission so representative may witness [ Approval~ No. [] Plug integrity ~ BOP Test [] Lopa,.tion clearanceI .&pproved L;opy R~uj~n~ed ORIGINAL SIGNED BY LONNIE C. SMITH Commissioner Form 10-403 Rev 12-1-85 WELLS3/20 D. M. Fife, 263-4278~_~ by order of the commission Date Submit in triplicate~ DS 18-11 CTU Cement Squeeze AFE# 797961 Preliminary Procedure 1. Make a slickline tag run to verify the PBTD. 2. RIH with CT. Wash the perforations with full strength mud acid. Flow well to produce out all the acid. 3. Surge the well with the slickline surge tool set in the tubing tail. 4. RIH with coiled tubing and fluid pack the wellbore with filtered seawater. 5. Pump 25 bbls of cement followed by 2 bbls of water and 50 bbls of contaminant. Hold 1500 psi surface squeeze pressure for 60 minutes. Squeeze off the following perforations: Zone Perforations (Ref.: BHCS 9-12-87) 2 11646-11656 lB 11664-11674 lB 11686-11706 lB 11712-11742 lB 11752-11758 lB 11762-11776 6. Jet or reverse out the contaminated cement. 7. Perforate as follows: Zone Perforations SPF 2 11646-11656 LSD lB 11664-11674 FSD lB 11686-11706 FSD lB 11712-11742 FSD lB 11752-11758 FSD lB 11762-11776 FSD (Ref.: BHCS 9-12-87) Other Well Information: Current status: On production. -Expected static bottomhole pressure: 3770 psi. @ 8800' SS Expected fluid in wellbore at reperforation: seawater. 4 :3 1. 5000 PS1 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) .3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF 2 H]REL]NE BOP EQUIPMENT _ 6 5 4 3 2 1. 5000 PSI ?" WELLHEAD CONNECTOR IrLANG£ 2. 5,000 PSI 4 1/16" PIPE RAMS ,3. 5000 PS! 4 1/6" HYDRAULIC SLIPS 4. 5,000 PSI 4 1/6" SHEAR RAMS 5, 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PS1 4 1/16" STUFFING BOX RECEIVED Anchor~ge (:OILED TUBING UNIT BOP EOUIPHENT III I I I I I I IIII I! I II I II I IIIII I ~ I I I I ~_ STATE OF ALASKA ALASKa., OIL AND GAS CONSERVATION COMMIoolON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate/~ Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Ala~;ka_ Thc__ 3. Address Post Office Box 100360, Anchorage, AK 99510 4. Location of well at surface 1278'FNL, 431'FWL, Sec. 19, T11N, R15E, UM At top of productive interval 1795'FNL, 1627'FWL, Sec. 30, T11N, R15E, UM (approx.) At effective depth 2282'FNL, 1797'FWL, Sec. 30, T11N, R15E, UM (approx.) At total depth 2314'FNL, 1804'FWL, Sec. 30: TION: R15E: UM (approx.~ 11. Present well condition summary Total depth: measured 11927 feet Plugs (measured) true vertical 8983 feet Effective depth: measured 11886 feet Junk (measured) true vertical 8957 feet 5. Datum elevation (DF or KB) .55' RKR Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 18-11 8. Approval number 8-192 9. APl number 50-- 029-21181''~2r 10. Pool Prudhn¢ Ray 0il .Pool Casing Length Size Conductor 80' 20" Surface 2462' 13-3/8" Production 11025' 9-5/8" Liner 1164' 7" Cemented Measured depth True Vertical depth 1900# Poleset 110' 110' 2400 Sx CS 111 & 2500' 2500' 400 Sx CS 11 1000 Sx Class G & 11062' 8435' 300 Sx Class G 10763-11927' 8234-8983' Perforation depth: measured true vertical 11646-11656' 11664-11674' 11686-11706' 11712-11742' 11752-11758' 11762-11776' Tubing (size, grade and measured depth) 3~'", L-80, tbg w/tail @ 11382'MD Packers and SSSV (type and measured depth) 194SAB Pkr ¢ 10711 'Mn ~, C_.amro SSSV _ca 2211'MD 12. Stimulation or cement squeeze summary 8754-8760' 8765-8772' 8779-8791' 8820-8823' 8826-8835' 13. Intervals treated (measured) .- Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 2000 3600 0 1300 1700 . 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys., ,,Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~/,¢.~L,,~o -? - Signed ~~~~~J Title Operations EngineCrirlg Manager Date Form 10-404 Rev. ~2-1-85 18-11/ST^T17 M. K. Melton (265-6810) Submit in Duplicate R'FFI---I:;.'FNF:F' ~R£1] ¢.A.%FD I.-IFII Y F'I'KIA! f': A H f': fi f': A H f: fi f': A H f': £'1 :,",: F.' F' N '1" .1:;; A I !..7. 'r t I..7. H fi R 'r t :~'; P 1.4 T 1 I T 1::' X' F'R ldF! I I:' T I I:'.% !::' ~ .".;' A P f": 5 .%'f'ATF f'iF' A! STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG H&bh vvmrb~ · lVH vn n~vvmrb& · IvH n~rvn · ~qf]¥ uv~ 1. Status of Well REV] SED** Classification of Service Well OIL~] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 87-87 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21181 4. Location of well at surface 9. Unit or Lease Name~ 1278' FNL, 431' FWL, Seco19, T11N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 870' FNL, 1581' FWL, Sec.30, T11N, R15E, UM 18-11 At Total Depth 11. Field an~"P~ol 2331' FNL, 1722' FWL, Sec.30~ T11N~ R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) t 6. Lease Designation and Serial No. Prudhoe Bay Oi 1 Pool RKB 55'I ADL 28326 ALK 2324 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions Start 8/28/87 09/13/87 03/27/88* N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 11927'MD/8983'TVD 11886'MD/8958'TVD YES [~ NO []I 2211 feet MD 1900' (aD~rox~ · 22. Type Electric or Other Logs Run Gyro, BHCS/CNL/GR,CET/GR,CBT/GR,GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 11~' ~,~'~ lqnn ~ phi 13-3/8" [72.0# L-RO R,,rf ?r~r)r)' !7-!/2" 2400 sx CS !!! & ~00 sx CS II 9-5/8" 47.0# L-fiN Surf 11¢)R?, 12-1/4" !000 s× C]a_~_ G & 300 s; CS I 7" i29.0# L-80 10763' 11927' 8-1/2" ~,r~r) .~× CI~ G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) Perforated w/½ spf, 0°phasing SIZE DEPTH SET (MD) PACKER SET (MD) 11644 ' -11654' MD/8808 ' -8814 'TVD 3-1/2" 11382 ' 10711 ' Perforated w/4 spf, 0° phasing 11662 ' -11672 'MD/8819 ' -8826 'TVD 26. ACI D, FRACTUR E, CEMENT SOUEEZE, E'TC. 11684'-11704'MD/8833'-8845'TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Perforated w/6 spf, 0° phasing 2900'-2211'cmt plu 587 sx CS II l1710'-11740'MD/8849'-8867'TVD 2525'-2257'cmt plu, 230 sx CS II 11750 ' -11756 ' MD/8874 ' -8877 'TVD 11760'-11774'MD/8880 '-8888 'TVD 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.} I ' Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD * , , Flow Tubing :Casing Pressure CALCULATED.~ OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 24-HOUR RATE ~ 28. CORE DATA ~, I ~ Brief description of lithology, porosity, fractures, apparent dips and presence of Oil, ~as or water. Subm it c.~or_e~.~ '~ None ~ ~,~.. ,~ · NOTE: Original well (EXXON Tract Well 19-11-15) spudded 9/10/84, RR 9/17/~i~ Redri~'~ (18-11) RR 9/16/87. Tubing run 3/1 2/88. Perforated well 3/27/88. (Dani ) TEMP3/WC97 · * NOTE: APl Cf Revi Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate ~/j:. 29. : ~t... 30.' : -, GEOLOGIC MARK'~,~RS ; FORMATION TESTS ~" NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and tir~e of each phase. Top Sadl erochi, t 11077 ' 8447 ' N/A Base Sadl erochit 11778' 8891 ' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~0 ~ ~/JJ-~ Title Associate Engin~.~.r Date /~-{~r'~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and tog on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing toot. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ~ ALAS,.,~ OIL AND GAS CONSERVATION COMk..$SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other ~] CONPLETE~ RENAME REVISED* 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 55' Feet 3. Address 6. Unit or Property name P.O. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit 4. Location of well at surface 1278' FNL, 431' FWL, Sec.19, T11N, R15E, UM At top of productive interval 870' FNL, 1581' FWL, Sec.30, T11N, R15E, UM At effective depth 2299' FNL, 1715' FWL, Sec.30, T11N, R15E, UN At total depth 2331' FNL, 1722' FWL, Sec.30, T11N, R15E, UM 11. Present well condition summary Total depth: measured 11927'MD true vertical 8983'TVD Effective depth: measu red 11886 'MD true vertical 8958'TVD Casing Length Size Conductor 80' 20" Surface 2462 ' 13-3/8" Production 11025' 9-5/8" Liner 1164' Perforation depth: measured 7,I None feet feet feet feet 7. Well number 18-11 ~i//') 8. Approval number 7-538 & 7-819 9. APl number 10. Pool Prudhoe Bay Oil Pool Plugs (measured) None Junk (measured) None Cemented Measured depth True Vertical depth 1900# Pol eset 110'MD 110'TVD 2400 sx CS Ill & 2500'MD 2500'TVD 400 sx CS II 1000 sx Class G & 11062'MD 8437'TVD 300 sx CS I 300 sx Class G 10763'-11927'MD 8232'-8983'TVD true vertical None Tubing (size, grade and measured depth) 3-1/2", L-80, tbg w/tail ~ 11382' Packers and SSSV (type and measured depth) SAB pkr ~ 10711' & TRDP-1A-SSA SSSV ~ 2211' 12. Stimulation or cement squeeze summary N/A Intervals treated (measured) RECEIVED JUN Z l 1988 ~chorage .,- Treatment description including volumes used and final pressure 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Inj, ection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. AttachmentS Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 * APl #Revised Title Associ ate Engineer (Dani) Date SW03/61 Submit in Duplicate q.:' ':? 'T. i (':) T'.: A T F · l;.:l=F'l--~:F:,XJf'i~: A~'i]O C.A~'FD l-.If'!l F' F'TNAII. Fi A i'q f': f'l fC I-- A Fi' Fi. A M f-.' f'! C A N f': I"! f; r.:' A F;.' f; F ;-", F;: [: A H f'i Fi Fi A ['i I": F1 F: A i'-t f"~ Fi f'i A H, F: f'i f': A i~.!Fi f'i g: !:= F'~ F::i t] V F' 0 1=.: Y ......................................................................... btAVF A ~gT[-.'F' DAY: Alaska 0il & Gas Cons. 'Anchorage l !::' i'J 'T' F;,' r:'~ ! F.' 'r ~ er .:.', · ::' f".' t..! k:' 'v' i:;.' f'i i"J F:i '.:< X ['! i"-.J i',i ,.-~ F.: ;::: 'l' 1-4 f"~ i,J -"- H fT.l ~4 'r i 1. Status of Well Classification of Service Well OIL ~] GAS [] SUSPENDED [] ABANDONED [] SERVICE []. .. 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 87-87 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21181-OO 4. Location of well at surface 9. Unit or Lease Name 1278' FNL, 431' FWL, Sec.19, T11N, R15E, UM Prudhoe Bat, Unit _ At Top Producing Interval 10. Well Number 870' FNL, 1581' FWL, Sec.:30, TllN, R15E, UM 18-11 At Total Depth 11. Field and~'Pool 2331' FNL, 1722' FWL~ Sec.30, T11N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool ,.RKB 55'I ADL 28:326 ALK 2324 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions Start 8/28/87 09/13/87 0~/27/88'I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. PIugBackDepth(MD+q-VD) 19. DirectionaISUrvey 20. Depth where SSSV set I 21. Thickness of Permafrost 11927'MD/898:3'TVD 11886'MD/8958'TVD YES [~] NO [] 2211 feet MDI 1900' (aDDrox~ . , , 22. Type Electric or Other Logs Run Gyro, BHCS/CNL/GR ~CET/GR, CBT/GR, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-z~0 Surf 11{3, '~0" lq(~o ~ pn1~t- 13-3/8" 72.0# I.-B0 .~lrf 9-5/8" 47.0# L-BO Surf 11OR2' 12-1/b," 1000 ~x Cl. ass 7" 29.0# I.-80 107G_~ ' 11927' R-l/?" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) Perforated w/½ spf, 0°phasi ng SIZE DEPTH SET (MD) PACKER SET (MD) 11644 ' -11654 ' MD/8808 ' -8814 ' TVD 3-1/2" 11382 ' 10711 ' Perforated w/4 spf, 0° phasing 11662'-11672'MD/8819'-8826'TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11684'-11704'MD/8833'-8845'TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 0 Perforated w/6 spf, 11710'-11740'MD/8849'-8867'TVD 2525'-2257'cmt plu(, 230 sx CS II 11750 ' -11756 ' MD/8874 ' -8877 'TVD 11760 ' -11774 'MD/8880 ' -8888 'TVD . 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAs-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRA, VlTY-ADI Press. 24-HOUR RATE I~ i'~, _. 28. CORE DATA ,, Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ' 'i '~.':' ~ "". ,": :~. None "~ · * NOTE: Original well (EXXON Tract Well 19-11-15) spudded 9/10/84, RR 9/17/84. Redrilled (18-11) RR 9/16/87. Tubing run 3/12/88. Perforated well 3/27/88. (Dani ) TEMP3/WC97 / STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO,v~r;,IlSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Form 10-407 Rev. 7-1-80 Submit in duplicate CONTINUED ON REVERSE SIDE 30. 29. M GEOLOGIC FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERTo DEPTH GOR,and time of each phase. Top Sadl erochi t 11077 ' 8447 ' N/A Base Sadlerochit 11778' 8891 ' 31. LIST OF ATTACHMENTS Addendums (dated 12/29/87) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~6 ~ ~~ Title Associate Engi n~r Date 5-~J-~ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ADDENDUM WELL: 18-11 9/22/87 RU Schl, rn CET/GR tl f/11,886'-9875' @ 1000 psi. Rn CET w/1000 psi f/11,886'-10,702' & 3rd rn w/0 psi f/11,886'-10,706'. Rn GR/CBT f/11,883'-9995' w/1000 psi. Rn CBT/GR w/1000 psi f/11,883'-9996' & w/0 psi f/11,883'-9990', POOH. Rn gyro f/11,835'-48' @ 100' intervals, POH, RD Schl. Drilling Supervisor ADDENDUM WELL' 10/28/87 18-11 Arctic Pak w/300 sx CS I & 125 bbls Arctic Pak; no test. Dr~i 11 i ng supervisor DIRECTIONAL SURVEY RECORD AND ANALYSIS Measurements While Drilling ~-' i-., ('], / COMPANY WEnn NAME ARCO ALASKA, INC. D. S. #18 WELL NO. 1! p?[~ PRUDHOE BAY, SEC19 TllN R[5E, 1278' FNL 431' FWL Job Reference Number 15-31849 Loqqed By: G.B. KERSEY Date 20-SEP-87 ,Computed By: 6.B. KERSEY ANAl)RILL WELL H~D ~TION: LAT(N/-$) 0,00 ~ZI~'H ~ ROT~Y TABLE TO TARGET I; TIE IN POINT(TIP) : ~I~'.ASURED DEPTH 2700,00 TF~E VE~' DEPTH 2.699,00 INCLIN;,TION 0.76 AZIImJTH 219,30 {)EF'A~£ (F../-W) -6,19 DEP(£/-W) 0,00 ~L~UR~ I~ 9ERTI~ ~UTH OEPTH ft ft ft ~700.00 0.0 2699.00 2841.00 141,0 2839.~ 3030,00 189,0 3028.21 3211,00 181,0 3206,61 3404.00 193o0 3393,04 ~ ~TI~ ~O ~YSI3 T~ ~ATI~ ~I~ ~TI~DE f~ d~ ~ ft fT 0,~ 0.76 219,~ -2,~ -6.19 4.81 3.~ 1'~,~ -6.72 -8,~ 19.35 6,~ 1~,~ -22.I8 -11.83 ~.~ 13.~ I~,~ -52.03 -11,~ 97.62 16.~ 179,~ -101.79 -10.42 D~J~: DISP~Drr at ft 6.52 11,07 25.14 53.30 102,32 ~IRJTH d~. HI.59 2~,07 192.57 185.85 lOOft 2.06 1.45 3.89 2,03 358~,60 I82.6 35&3,31 3768,00 181,4 3722,95 3949,00 181,0 3874.56 4137,00 188,0 4021.90 4317,00 180,0 4148.44 4504.00 187,0 4270.87 4687.00 183,0 43&5.15 4852.00 165.0 4468.75 5006.00 154,0 4585.66 51~,00 148,0 ~78,09 162.7~ 2'3,20 168,30 -16~,94 -3,41 1~,88 181.17 5.02 248,64 31,40 164,60 -250,39 16,72 250,95 176,18 3.~ 347.35. 34,80 l&&,70 -346,13 41.21 348,58 173,21 1.98 463,~ 41,90 1~M,30 -458.98 70.40 464~35 171,28 3,86 591.45 '48.70 166.40 -582,69 102,74 591,68 170,00 3.87 732,76 49,50 168.60 -720.67 133,33 732,~ 169,52 0,~ 874,50 52,40 165,30 -857,09 165,41 874,87 169,10 2,11 1003,87 50,70 I66,00 -984,27 197,44 1003,88 1~,66 1.08 1123,45 51,30 I&~,20 -1100,45 226,19 1123,45 168,39 0.40 1238.89 51,40 164,80 -1212o35 2.~,13 1238.?I 168,12 0,74 5335,00 181.0 4792.12 5634,00 2~,0 4982.71 5941,00 307,0 5177.98 6~'7,00 316.0 5375.34 6534,00 277.0 5541,45 I379.24 50.50 165,70 -1348,28 290.91 1609.41 50.30 166,00 -1571,69 347.23 1846.12 50.70 1&6.50 -1801,78 403,54 2092.83 52.00 167,50 -2042.24 459,0~ 2314,43 54.30 167,00 -2258.41 507,97 1379,31 1846,42 2093,19 2314,84 167,82 167,54 167.38 167,33 167.32 0,~ 0,10 0,18 0,48 0,84 ~2,00 328.0 5733.55 7079,00 217.0 5~.2.01 · 7343.00 ~64,0 &321.81 7666.00 323:.0 6221.Y? 7974.00 308.0 6413.93 2580.25 54.00 168.20 -2518.06 ~5.05 2755.13 53.40 169.50 -2./,89,65 599.87 2965,25 52.10 i~,70 -2895.99 3218.90 51,40 168,00 -3144.42 689,83 3459.61 51,40 I68,80 -3380.21 73V3,23 2755.5I 2965,57 321~.20 3459,88 167,3'J 167.45 167.56 167.63 167.68 0.31 0.56 0.55 0.28 0.20 )313,00 337,0 .~27,04 ~?l.O0 30?.0 7055.43 ~2.78.00 30?.0 ?254,40 9585.00 307,0 7452.55 372'3,22 50,70 169,50 -3&39,13 7S7,86 3991,05 48,80 I66,00 -3900.87 844.69 4222,3,3 4~,I0 165,60 -4125.32 901,49 4455,95 50.10 166.90 -4352,40 957.05 469('.,,33 49,50 I~,60 -4580,64 1010,$0 3723,44 3991,28 4~,67 4456.~ 4690,84 167,7~ 167,78 167,67 1.57.60 167.56 0,26 0,93 0,14 0,46 0,21 985%00 274,0 7~'2.49 10166,00 307,0 7835.51 104/'5.00 309.0 8040,87 10805,00 330.0 8265,~ II009,00 204.0 8404,28 4896,83 48.40 1&6.20 -4781.47 1059.38 5126,96 48,~0 1~.10 -5005.09 1114.52 5357.69 47.90 I&%40 -5229.36 1169,40 5599.59 46,40 170,20 -5466.22 1219.45 5748,77 47,70 171,20 -56.13,57 1242,58 4897,43 5127,67 5358.52 5600.37 5749.45 167.51 167,45 167,39 167.43 167,52 0.42 0,13 0,30 0.96 0.73 !13~.00 299,0 8~00.43 i15~.~30 291.0 8783.[.6 5974.34 50.30 167.20 -5~.17 1284,85 6200.62 51,80 168,00 -6056,19 1333,45 5974,95 h201,25 167,59 167,58 1.33 0,56 ANADR ["~LL Schlumberger DIRECTIONAL SERVICES ARCO ALASKA .~NC. DS ~18 H,f~ L L ~'11 ..... $EC19 T11N R15E 1278' FNL 431' FH4.. VERTICAL PROJECT[ON -1500 0 0 AZ I MU T It 1~00 = 168. 4 DEGREES ~ooo HOR I ZONT AL PLOT N 1500 3000 4500 6000 7300 g00o -1500 PLATFORM R[FERENC~ POZNT (PRP) ~ 1278' FNL 43~' F~. ABSOLUTE LOCATION : ~EC 19 Tt1N RI5£ WELL LOCATION INFORMATION ~J[LL HEAD LOCATION (FROM PRP) LAST SURVEY N/--S 0.00 FT TVD 878;5. 4. FT £/-w O. oo PT a/-s --~OS6. Z F'r CASING DIAMETER MEASURED DEPTH 7.0. 000 ~N 109. o FT ~a.~7~ ZN ~Z~O0. O FT 9. 625 TN 8449.0 FT TYPE OF SURVEY METHO0 OF CALCULATZON NUMBER OF STAT/ONS WELL SURVEY INFORMATION :MILD AZIMUTH IrROt~ ~E:LL HEAD TO TARGET : lO&. 4 : RADS:US OF CURVATURE MAXIMUM ZNCLINATTON : o. o " 37 PLOT MADE B'f : G. B. Kersey - - "J A__~I'O J? DEe SUB. SURFACE DIRECTIONAL SURVEY [~] UIDANCE ~'~ ONTINUOUS ["~ OOL Company ARCO AL.ASK.A, INC. , . _ Well Name ~:s~ !8-]] (.1278' FNL, '431'. FWL, SEC 19..T11NaR15E.UN). Pl~' i~] Field/Location PRUDHOE B, AY,, NORTH SLOPE, ALASKA ooa~ ~e"f- ~,~tl t9-//-/~ Job Reference No. 72625 Loaaed By: MCBRIDE II Date 21-SEP-87 Compu,tecl By:. KOHR];N~ I SCHLUMBERGER GCT DIRECTIDNAL SURVEY CUSTOMER LISTING FOR ~RCD ~LASKA, INC. D.S. 18-11 ~RUDHOE BAY NORTH SLOPE~ALASKA SURVEY DATE: 21-SEP-87 ENSINEER: ~CBRIDE METHODS DF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 11 DEG 43 MIN EAST COMPUTATION DATE: 05-MAR-88 PAGE ARCO ALASKA, INC. D.S. 18-11 PRUOHOE BAY NORTH SLOPE,ALASKA DATE OF SURVEY: Z1-SEP-87 . KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF ME~SUREO DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR CQORDINAT'ES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SgUTH EAST/WEST gIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -55.00 0 0 N 0 0 E 100.00 100.00 45.00 0 7 S 83 55 E 200.00 200.00 145.00 0 7 N 32 55 W 300.00 300.00 245.00 0 10 S 46 8 E 400.00 400.00 345.00 0 7 S 12 27 W 500.00 500.00 445.00 0 14 S 40 0 E 600.00 600.00 545.00 0 4 S 28 50 E 700.00 700,00 645.00 0 12 S 9 54 W 800.00 800.00 745.00 0 16 S 39 48 E 900..00 900.00 345.00 0 14 S 49 7 E 0.00 0.00 0.00 N 0.00 E 0.04 0.24 0.02 S 0.10 E -0.08 0.28 0.12 N 0.20 E 0.00 0.44 0.03 N 0.16 E 0.12 0.41 0.05 S 0.31 E 0.49 0.26 0.42 S 0.38 E 0.68 0.26 0-57 S 0.57 E 0.87 0.21 0.78 S 0.50 E 1.30 0.19 1.20 $ 0.64 E 1.65 0.08 1.49 S 0.95 E 0.00 N 0 0 E 0.10 S 76 1 E 0.24 N 58 7 E 0.16 N 77 57 E 0.32 S 80 0 E 0.57 S 42 25 E h 0.81 S 45 4 E 0.93 S 32 22 E 1.35 S 28 0 E 1.77 S 32 39 E 1000.00 999.99 944.99 llOO.OO 1099.99 1044.99 1200.00 1199.99 1144.99 130 O. O0 12 99.99 1244. }9 1400.00 1399.99 1'344.99 1500.00 14'39.99 1444.99 1600.00 1599.99 1544.99 1700.00 1699.98 1644.93 1800.0.0 1799.93 1744.58 1900.00 1899.93 1844.98 0 13 S 49 45 E 0 7 N 73 49 E 0 6 N 7 23 W 0 20 N 42 37 W 0 23 N 35 43 W 0 21 N 35 38 W 0 24 N ~.6 35 W 0 21 N 76 16 W 0 9 N 15 57 W 0 17 S 74 23 W 2.02 0.16 1.80 S 1.27 E 2.16 0.13 1.89 $ 1.54 E 2.09 0.35 1.79 S 1.66 E 1.74 O.1B 1.49 S 1.40 E 1.15 0.12 0.93 S 0.97 E 0.54 O.OS 0.43 S 0.59 E 0.00 0.35 0.03 N 0.17 E -0.37 0.40 0.27 N 0.55 W -0.64 0.13 0.48 N 0.83 W -0.79 0.28 0.59 N 1.03 W 2.20 S 35 16 E 2.44 S 39 8 E 2.44 S 4! ~8 E 2.04 S 43 11 E 1.38 S 44 58 E 0.73 S 53 4,3 E 0.18 N 79 17 E 0.61 N 63 52 W 0.96 N 60 9 W 1.23 N 61 33 W 2000.00 1999.98 1944.98 2100.00 2099.98 2044.98 2200.00 2199.99 21'44.98 2300.00 2299.98 2244.92 2400.00 2399.9~ 2344.98 2500.00 2499.98 2444.98 2600.00 2599.95 2544.'35 2700.00 !699.87 2644.37 2800.00 2799.72 ~744.'72 2900.00 2899.51 2944.51 0 14 S 73 lO w 0 10 S ~1 22 W 0 17 S 5R 17 W 0 17 S 68 15 W 0 11 S 67 4l W 0 23 S 88 7 w 1 52 S 60 24 W 2 37 S 4~ 41 W 3 32 S 27 0 W 3 57 S 18 26 W -0.72 0.33 0.40 N 1.60 W -0.62 0.08 0.24 N 1.87 W -0.42' 0.20 O.OZ S 2.17 W -0.39 0.19 0.16 S 2.68 W -0.29 0.11 0.3~ S 3.05 W -0.37 1.26 0.32 S 3.37 W 0.19 0.29 1.30 S 5.34 W 1.82 1.59 3.59 S 8.33 W 5.73 0.80 8.20 S 11.35 W 11.07 1.20 14.18 S 13.84 W 1.65 N 75 59 W 1.89 N 82 37 W 2.17 S 89 33 W 2.69 S 85 35 W 3.07 S 83 38 W 3.39 S 84 30 W 5.50 S 76 19 ~' 9.07 S 66 4! ~ 14.01 S 54 9 W 19.81 S 4% 19 W 3000.00 2999.21 2944.21 5 4 3100.00 3098.52 3043.52 8 38 3200.00 3196.68 3141.68 12 54 3300.00 3293.94 3238.94 13 57 3400.00 3390.37 3335.37 16 49 3500.00 34 '34.88 3429..~8 21 29 3600.00 3576.42 3521.42 25 53 3700.00 3664.44 3609.44 30 T 3800.00 3750.11 3.595.11 32 0 3900.00 3834.04 3779.04 33 50 5 57 W 1 9 E 2 20 E 2355 2 54 r- I 46 E 11 31 E S 15 42 E S 15 S 13 57 E 18.12 2.38 21.71 S 29.33 4.49 33.22 S 48.03 2.13 52.15 S 70.95 2.00 75.39 S 97.14 3.86 101.76 S 129.15 5.07 134.34 S 169.09 6.00 174.17 S 216.43 2.23 220.04 S 267.90 2.30 269.76 S 322.19 2.09 322.37 S 15.46 W 26.65 S 35 27 W 15.73 W 36.75 S 25 19 W 14.96 W 54.26 S 16 0 W 14.13 W 76.70 S 10 36 W 12.32 W 102.51 S 6 54 W 11.73 W 134.85 S 4 59 W 7.11 W 174.32 S 2 ZO W 4.80 E 220.09 S I 14 E 18.54 E 270.39 S 3 55 E 32.20 E 323.98 S 5 ~2 E C3MPUTATION DATE: 05-MAR-88 ARCO ALASKA, INC. D.S. 18-11 PRUDHOE BAY NORTH SLOPE,ALASK~ INTERPOLATED VALUES FOR EVEN 100 FEET DF TRUE SU~-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTh gEPTH COURSE VERTICAL DOGLEG DEVIATION AZIMUTH S:_CTION SEVERITY DEG MIN DEG MIN FEET DEG/IO0 4000.00 3916.19 3961.19 4100.00 3995.77 3940.77 4200.00 4070.10 4015.10 4300.00 4140.07 4085.07 4400.00 4206.01 4151.01 4500.00 4270.91 4215.91 4600.00 4335.27 4280.27 4700.00 4397.75 4342.76 4800.00 4458.91 4403.91 4900.00 4521.75 4'+66.75 35 47 S 12 5? E 379.18 2.44 39 28 S 13 4q ~_ ~39.&9 6.31 43 47 $ 15 41 E 506.44 3.45 47 35 S 14 5 E 577.70 4.7.1 49 21 S 12 12 E 652.,]6 1.26 49 26 S 11 16 ~ 72~.93 1.38 50 26 ~ 11 2~ ~ 30~.47 1.47 52 6 S 13 39 E ~83.51 1.36 ~1 54 S 13 35 E 962.58 2.60 50 44 S 14 59 E 1040.28 0.44 5000.00 45;34.77 4529.2'7 5100.00 4647.37 4592.37 5200.00 4709.~2 4554.~32 5300.00 4772.71 4717.71 5400.00 4,836.14 4781.14 5500.00 4899.94 4,244.'}4 5600.00 4963.84 4908.84 5700.00 5027.64 4972.64 5800.0,0 50}1.46 5036.46 5900.00 5155.27 5100.27 51 13 S 14 25 E 1117.82 0.83 51 13 S 13 23 ? 1195.74 1.13 51 17 S 14 29 ~ 1273.78 0.90 51 5 $ 14 0 ~: 1351.46 1.00 50 17 S 13 47 ~ 1428.70 0.70 50 16 S 13 57 E 1505.64 0.54 50 16 S 13 45 E 1582.51 0.40 50 2~ S 13 55 E 1559.47 0.57 50 15 $ 13 59 E 1736.39 0.29 50 28 S 13 48 E 1513.33 0..62 6000.00 5218.42 5163.42 6100.00 5279.53 522~,.63 6200.00 5341.21 5286.21 6300.00 5402.80 5347.,~0 6400.00 5453.36 5408.36 6500.00 5522.51 5467.51 6600.00 55~0.83 5525. ~3 6700.00 5639.45 5584.45 6800.00 5698.34 5~43.34 6900.00 5757.17 5702.17 51 41 S !3 38 a 1890.82 2.48 52 20 S 13 S F 1969.94 0.62 :,1 3~ S 12 53 E 2'348.63 0.41 52 23 S 12 39 E 2127.40 0.25 53 12 S 12 14 E 2206.97 1.60 54 6 S 11 40 E 2287.59 0.74 54 lC; S 11 38 E 2368.83 0.78 53 51 S 11 2! : 2449.84 0.72 53 55 S 11 16 E 2530.66 0.62 53 5~ S 10 5} E 2611.52 0.49 7000.00 5816.21 5761.21 7100.00 5875.58 5820.58 7200.00 5935.34 5880.34 7300.00 5995.76 5940.76 7400.00 6057.0~ 6002.03 7500.00 6119.00 6064.00 7600.00 6181.08 6126.08 7700.00 6243.48 6188.48 7800.00 6305.92 6250.92 7900.00 6368.83 6313.~3 53 4'+ S 10 29 E 2692.22 0.58 53 22 S 10 31 E 2772.68 0.53 53 7 S 10 32 E 2852.133 0.60 52 22 S lO 28 E 2932.50 0.82 51 57 S 10 22 E 3011.46 0.43 51 34 S 10 37 E 3089.97 0.66 51 28 S 10 42 E 3168.35 0.64 51 25 S 10 45 c. 3246.49 0.50 51 3 S 10 49 F 3324.58 1.17 51 7 S 10 52 E 3402.31 0.65 DATE 9F SURVEY: KELLY BUSHING ELEVATION: ENGINEER: MEASURED DEPTH PAGE 21-SEP-87 55.00 FT MCBRIDE 377.86 S ~5.39 E 3c~0.56 S 6 50 E 436.63 S 58.91 E 440.78 S 7 40 E 501.40 S 76.27 E 507.16 S 8 38 E 570.28 S 95.06 E 578.15 S 9 Z7 E 643.55 S 111.85 E 653.20 S 9 51 E 717.99 S 127.55 E 729.23 S 10 4 E 7'93.05 S 142.51 E 805.76 S 10 11 f 869.23 S 159.51 E ;383.75 S 10 23 E 946.08 S 178.34 E 962.74 S 10 40 E 1021.45 S 197.55 :_ 1040.38 S 10 56 E 1096.52 S 217.37 E 1117.86 S 11 12 E 1172.23 S 236.04 E 1195.75 S Il 23 E 1248.00 S 254.99 E 1273.79 S 11 32 E 1323.40 S 273.95 E 1351.46 S I1 41 E 1398.38 S. 292.80 E 1428.70 S 11 49 E 1473.14 S 311.22 E 1505.65 S 11 55 E 1547.82 S 329.67 E 1582.54 S 12 I E 1622.61 S 347.98 E 1659.50 S 12 6 i t697.30 S 366.63 E 1736.45 S 12 11 E 1772.06 S 385.09 E 1813.42 S 1Z 15 E 1847.36 S 403.54 E 1890.92 S 12 19 E 1924.40 S 421.72 E 1970.07 S 12 21 E 2001.09 S 439.44 E 2048.77 S 12 23 E 2077.92 S 456.85 E 2127.55 S 12 23 E 2155.59 S 474.15 E 2207.13 S 12 24 E 2234.48 S 490.84 E 2287.75 S 12 23 E 2314.05 S 507.15 E 2368.97 S 12 21 F 2393.42 $ 523.41 E 2449.98 S 1Z ZO L 2472.65 S 539.34 E 2530.79 S 1Z 18 E 2552.02 S 554.88 E ?.611.64 S 12 16 E 2631.31 S 569.91 E 2692.32 S 1Z 13 E 2710.41 S 584.69 E 2772.76 S 12 10 E 2789.26 S 599.26 E 2852.90 S 12 7 E 2867.61 S 613.77 E 2932.55 S 12 4 E 2945.3l S 627.95 E 3011.50 S 12 2 E 3022.52 S 642.23 E 3090.00 S 11 59 E 3099.55 S 656.81 E 3168.38 S 11 57 E 3176.32 S 671.40 E 3246.51 S 11 56 E .R253.03 S 686.13 E 3324.60 S 11 54 E 3329.35 S 700.88 E 3402.33 S 11 53 E RECTANGULAR COORDINATES HORIZ. DEPARTURE NORTH/SDUTH EAST/WEST DIST. AZIMUTH FEET FEET FEET DEG MIN ARCO ALASKA, INC. 9.S. 18-11 PRUOHOE BAY NORTH SLOPE,ALASK4 COMPUTATION DATE: 05-MAR-88 PAGE . D~,TE OF SURVEY: 21-SEP-87 KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL 'VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MTN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/LO0 FEET FEET FEET DEG MIN 8000.00 6431.72 6376.72 50 56 8100.00 6494.69 6439.69 50 57 8ZO0.O0 6557.81 6502.81 50 45 8300.00 6621.17 6566.17 50 41 8400.00 6684.54 6629.54 50 39 8500.00 6748.29 6693.29 50 13 8600.00 5812.45 E757.45 49 59 8700.00 6876.81 6821.5! 49 54 8800.00 6941.19 6a86.19 49 49 8900.00 7005.96 6:350.96 49 26 S 10 56 E 3480.05 S 11 5 f 355'7.73 S 11 6 E 3535.28 S 11 3 E 3712.65 S 10 59 E 3790.01 S 10 37 E 3867.04 S 10 21 5 3943.72 S 10 25 E 4020.24 S 10 40 E 4096.74 S 10 59 E 4172.92 0.52 0.43 0.39 0.56 1.10 0.08 0.63 0.76 1.02 0.72 3405.70 S 715.57 E 3480.06 S 11 51 E 3481.95 S 730.46 E 3557.74 S 11 50 E 3558.04 S 745.45 E 3635.29 S 11 49 E 3633.95 S 760.38 E 3712.65 S 11 49 E 3709.87 S 775.24 E 3790.01 S 11 ~,8 E 37a5.55 S 739.67 E 3867.04 S 11 46 E 3860.98 S 803.58 E 394.3.72 S 11 45 E 3936.26 S 817.39 E 4020.24 S 11 43 E 4011.49 S 831.40 E 4096.74 S 11 42 E 4086.31 S 845.75 E 4172.92 S 11 41 E 9000.00 7071.20 7016. Z0 49 10 9100.00 7136.49 7081.49 49 31 9200.00 7201.25 7146.25 49 34 9300.00 7255.63 7210.69 50 10 9400.00 7329.81 7274.31 50 1 9500.00 7394.09 7339.09 49 56 9600.00 7458.74 7403.74 49 9700.00 7523.58 7468.58 49 30 9800.0.0 7598.75 7533.75 49 9900.00 7654.72 759'3.72 48 25 11 7 E 4248.72 10 51 E 4324.44 10 28 E 4400.62 9-4l E 4477°06 9 42 E 4553.75 9 48 E 4630.32 10 3 E 4706.56 I0 19 E 4782.67 10 38 E 435~.50 11 1~ E 4933.65 0.57 1,59 0.52 0.79 0.50 0.66 0.59 0.30 1.10 1.73 4160.71 S 860.29 E 4248.72 S 11 40 E 4235.02 S 874.83 E 43,7_4.44 S It 40 E 4309.95 S 888.75 E 4400.63 S 11 39 E 4385.23 S 902.13 E 4477.07 S 11 37 E 4450.88 S 915.04 E 4553.76 S 11 35 E 4536.36 S 928.13 E 4630.34 S 11 33 E 4611.49 S 941.30 E 4706.53 S 11 32 E 4686.44 S 954.74 E 4782.70 S 11 30 E %761.01 S 968.56 E 4858.53 S ll 29 E 4834.76 S 983.04 E 4933.69 S 11 29 E tO000.O0 7731.28. 7565.28 48 32 10100.00 7787.53 7732.53 48 24 10200.00 7853.49 7798.49 48 49 10300.00 7919.49 7864.49 48 50 10400.00 79~5.46 7930.46 48 25 10500.00 8052.29 7997.29 47 4,,9 10600.00 8119.90 8064.90 47 3 10700.00 8188.51 8133.31 46 21 10800.00 ~257.76 8!02.76 46 15 10900.00 8316.85 8271.~5 46 25 S 11 I ~ 5008.27 S tO =~8 ~ 5083.16 S 10 25 E 5158.33 S 10 39 E 5233.43 S 11 0 E 5308.57 S 11 31 E 5382.96 S 11 57 E 5456.54 S 12 10 E 5529.39 S 11 31 5 5601.53 S 10 37 E 5673.83 1.56 0.60 0.77 0.67 I .51 0.55 1.22 1.12 I .07 0.57 6907.92 S 997.78 E 5008.31 S ll 29 E 4981.47 S 1011.88 E 5083.20 S ll 28 E 5055.36 S 1025.79 E 5158.3~ S 11 28 E 5129.18 S 1039.66 E 5233.49 S 11 27 E 5203.00 S 1053.71 E 5308.63 S 11 26 E 5275.9% S 1068.34 E 5383.02 S 11 26 E 5348.09 S 10,33.27 E 5456.70 S 11 27 r 5419.24 S 1098.48 E 5529.45 S 11 27 ~ 5489.82 $ 1113.39 E 5601.59 S II 27 E 5560.78 S 1127.27 E 5673.89 S 11 27 E 11000.00 8395.43 8340.43 ,~7 14 11100.00 8462.64 8407.64 48 23 11200.00 8528.15 8473.15 49 20 11300.00 8592.99 8537. :)9 49 56 11400.00 8656.61 8601.61 51 0 11500.00 8719.22 8664.22 51 40 11600.00 8790.85 8725.35 52 Z I1700.00 8842.59 8787.59 51 46 11800.00 8904.40 8949.40 51 48 11900.00 8966.tl 8911.31 51 44 S 10 7 E 5746.57 S 10 11 E 5;320.59 S 10 53 ~- 5896.12 S 12 1 E 5972.24 S 12 53 E 6049.38 S 12 32 E 6127.36 S 12 52 E 6206.08 S 13 10 E 6284.74 S 13 12 E 6363.32 S 12 52 E 6441.83 0.89 2.02 1.07 2.15 0.93 0.88 0.45 0.59 1.52 0.00 5632.36 S 1140.31 E 5746.63 S 11 26 E 5705.27 S 1153.30 E 5820.67 S 1l 25 E 5779.54 S 1167.09 E 5896.21 S 11 24 E 5854.17 S 1182.08 E 5972.32 S 11 24 E 5929.44 S 1199.01 E 6049.45 S 11 25 E 6005.53 S 1216.10 E 6127.42 S 11 26 E 6082.33 S 1233.46 E 6206.14 S 11. 27 E 6158.99 S 1251.19 E 6284.79 S 11 28 E 6235.52 S 1269.10 E 6353.36 S 11 30 E 6312.06 S 1286.72 i 6441.87 S 11 31 E ARCO ALASKA, INC. D.S. 18-11 PRUOHOE BAY NORTH SLOPE,ALASKA COMPUTATION DATE: OS-MAR-B8 PAGE DATE ~F SURVEY: 21-SEP-87 KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRU? SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORD[NRTES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ FEET DEG/IO0 FEET FEET FEET OEG MIN 11927.00 8983.03 892~.03 51 44 S 12 52 E 6%63.03 0.00 6332.73 S 1291.44 E 6463.07 S 11 31 E COMPUTATISN DATE: OS-MAR-88 PAGE ARCO ALAS~Am ~NC. D.S. 18-11 PRUDHOE BAY NORTH SLOPE,ALASKA OAT= OF SURVEY: 21-SEP-87 KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED V=RTICAL VERTTC6L DEVIATION AZTMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/TO0 FEET FEET FEET OEG MIN 0.00 0.00 -55.00 0 0 1000.00 999.99 944.99 0 13 2000.00 1999.98 1944.98 0 14 3000.00 Z999.21 2944.21 5 4 4000.00 3916.19 386;1.19 35 47 5000.00 4594.77 4529.77 51 13 6000.00 5218.42 516!.42 51 41 7000.00 5816.21 5761.21 53 44 8000.00 6431.72 6376.72 50 56 9000.00 7071.20 7016.20 49 10 N 0 0 E 0.00 S 49 45 E 2.02 S 73 10 W -0.72 S 5 57 W 18.12 S 12 52 E 379.18 S 14 26 E 1117.82 S 13 38 E 1B90.82 S tO 29 E 2&92.22 S 10 56 E 3480.05 S 11 7 E 4248.72 0.00 0.16 0.33 2.38 2.4,~ 0.83 2 0.53 0.52 0.57 0.00 N 0.00 E 0.00 N 0 0 E 1.80 S 1.27 E 2.20 S 35 16 E 0.40 N 1.60 W 1.65 N 75 59 W 21.71 S 15.46 W 26.65 S 35 27 W 377.86 S 45.30 E 380.56 S 6 50 E 1096.52 S 217.37 E 1117.86 S 11 12 E S 403.54 E 1890.92 S 12 19 1B47.36 2631.31 S 569.91 E 2692.3Z S 17-' 13 / 3405.70 S 715.57 E 3480.06 S 11 51 E 4160.71 S 860.29 E 4248.72 S 11 40 E 10000.00 77 21.213 7666.28 48 32 11000.00 83)5.43 8340.43 47 16 11927.00 8983.03 892 E). 03 51 44 S 11 1 E 500~.27 S 10 7 E 5746.57 $ 12 52 E 6463.03 I .56 0.89 O.OO 4907.92 S 997.75 E 5008.31 S li, 29 E 5632.36 S 1140.31 E 5746.63 S 11 26 E 6332.73 S 1291.4~, E 6463.07 S 11 31 E COMPUTATION D,~TE: 05-MAR-88 PAGE ARCO ALASKA, [NC. D.S. 18-11 PRUOHOE BAY NDRTH SLDPE,ALASKA DATE OF SURVEY: Zl-SEP-87 KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-$ER OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES H~RIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH ERST/WEST gIST. AZIMUTH F~ET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -55.00 0 0 N 0 0 : 55.00 55.00 0.00 0 7 N ?1 !~ E 155.00 155.00 100.00 0 7 N 26 45 E 255.00 255.00 200.00 0 6 S 33 23 W 355.00 355.00 300.00 0 6 S 60 55 E 455.00 455.03 ~OO.O0 0 14 S 11 13 = 555.00 555.00 500.00 0 7 S 56 4q ~ 655.00 655,00 600.00 0 8 S 27 26 W 755.00 755.00 700.00 0 15 S 21 11 E 855.00 855.00 .~00.00 0 14 S 48 20 ~ 0.00 0.00 0.09 N 0.00 E 0.00 0.52 0.01 N 0.01 E 0.02 0.33 0.03 N 0.21 E -0.11 0.44 0.14 N 0.13 E 0.07 0.42 0.01 S 0.31 E 0,30 0.33 0.24 S 0.29 E 0.63 0.19 0.53 S 0.52 E 0.7~ 0.23 0.65 S 0.54 E 1.09 0.25 1.01 S 0.52 E 1.50 0.15 1.37 S 0.81 E 0.00 N 0 0 E 0.01 N 64 58 E 0.21 N 82 54 E 0.19 N 42 57 E 0.31 S 8B 4 E 0.38 S 50 13 E - 44 16 [ ) 0.74 0.84 S 39 56 E 1.14 S 27 19 E 1.59 S 30 37 E 955.01 955.00 900.00 1055.01 1055.00 1000.00 1155.01 1155.00 llOO.O0 1255.01 1255.0:3 1200.00 1355.01 1355.00 1300.00 1455.01 1455.00 1400.00 1555.01 !555.00 1500.00 165.5.02 1655.00 1600.00 1755.02 1755.00 1700.00 1~355.02 1855.00 1809.00 0 15 S 44 25 E 0 9 S 76 4 E 0 5 N 50 5.) E 0 14 N 42 26 W 023 N 39 13 W 0 22 N 35 28 W 0 21 N 40 31 W 0 27 N T4 24 W 0 11 N 44 15 W 010 N 64 OW 11.95 0005 1-66 S 1.13 E 2.15 0.24 1.89 S 1.43 E 2.14 0.14 1.84 S 1.64 E 1.94 0.ZZ 1.66 S 1.56 E 1.43 0.18 1.22 S 1.16 E 0.81 0.06 0.67 S 0.75 E 0.24 0.17 0.17 S 0.39 E -0.!4 O.lg 0.20 N 0.22 W -0.51 0.34 0.36 N 0.78 W -0.77 0.57 .0.60 N 0.90 W 2.00 S 34 16 E 2.37 S 37 3 E 2.47 S 41 36 E 2.28 S 43 8 E 1.68 S 43 30 E 1.01 S 4~ 41 E 0.43 S 67 2 E 0.29 N 47 47 W 0.86 N 65 6 W 1.00 N 56 4 W 1955.02 1955.00 1900.00 2055.02 2055.00 2000.00 2155.02 2155.00 21'00.00 2255.02 2255.00 2200.00 2355.02 2355.00 2300.30 2455.02 2455.00 2400.00 2555.03 25~5.00 2500.00 2655.09 2655.00 2600.00 2755.20 2755.00 2700.00 2855.39 2855.00 2800.00 0 19 S 70 14 W 0 10 S 56 44 W 0 14 S 45 5 W 0 18 S 75 56 W 013 S 62 13 W 0 10 N 75 29 W 125 S 63 17 lJ 2 11 S 52 13 W 314 S 32 10 W 3 44 S Z1 52 W -0.75 0.05 0.48 N 1.38 W -0.68 0.08 0.33 N 1.77 W -0.50 0.06 0.09 N 2.00 W -0.41 0.14 0.09 S 2.46 W -0.33 0.19 0.27 S 2.90 W -0.29 0.38 0.37 S 3.21 W -0.22 2.16 0.64 S 4.13 W 0.98 1.19 2.34 S 6.94 W 3.69 1.37 5.85 S 10.05 W 8.54 0.73 11.37 S 12,79 W 1.46 N 70 59 W 1.80 N 79 Z1 W 2.01 N 87 20 W 2.46 S 87 54 W 2.92 S 84 42 W 3.23 S B) 30 W 4.lB S 81 15 )' 7.33 S 71 24 ~ 11.63 S 59 48 W 17.11 S 40 21 W 2955.64 2955.00 Z)0O.00 -~ 28 3056.08 3055.00 3000.00 6 45 3157.35 3155.00 3100.00 11 17 3259.93 -3255.00 3200.00 13 30 3363.16 3355.00 3300.00 15 41 3468.04 3455.00 3400.00 19 53 3576.30 3555.00 3500.00 Z4 4') 3689.10 3655.00 3600.00 29 50 3805.79 3755.00 3700.,30 32 ,5 3925.32 3855.00 3300.00 34 l~J S 11 58 W S 1 4 W S Z 30 E S I 58 E S 4 28 E S 0 2,t E S 9 20 E S 15 43 E S 15 3 E S 13 34 E 14.72 1.13 18.12 S 23.57 4.08 27.33 S 39.13 4.38 43.15 S 61.62 0.66 65.94 S 86.94 2.88 91.49 S 118.01 5.34 122.99 S 158.96 6.01 164.21 S 211.00 Z.64 214.81 S 270.98 2.16 272.74 S 336.38 1.92 336.16 S 14.90 W 23.46 S 39 25 W 15.75 d 31.55 S 29 56 W 15.36 W 45.80 S 19 35 W 14.48 W 67.51 S 1Z 23 W 13.02 W 92.42 S 8 6 W 11.92 W 123.57 S .~ 32 W 8.98 W 164.45 S 3 7 W 3.32 E 214.83 S 0 53 E 19.34 E 273.42 S 4 3 E 35.58 E 338.04 S 6 2 E COMPUTATION D~TE: O5-qAR-88 PAGE ARCO ALASKA, INC. D.S. 18-11 PRUDHOE BAY NORTH SLOPEtALASKA DATE OF SURVEY: Z1-SEP-B7 KELLY BUSHING ELEVATION: 55.00 FT ENGINEER: MCaRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TTU~ SUB-SFA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG HIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH E&ST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG HIN 4048.22 39S5.00 3900.00 37 5 4179.20 4055.00 4000.00 43 6 4322.3~ 4155.00 4100.00 48 20 4475.60 4255.00 4ZOO.O0 49 26 4631.12 4355.00 4300.00 50 56 4793.65 4455.00 4400. O0 52 Z 4952.60 4555.00 4500.00 50 54 5112.17 4655.00 4600.00 51 17 5271.85 4755.00 4700.00 50 53 5429.55 4855.00 4800.00 50 22 S 1Z 50 E 407.79 S 15 34 E 492.16 S 13 2'7 E 594.30 S 11 3'::)E 710.43 S 12 O E 829.53 S 13 34 E 357.58 S 14 48 E 1080.98 S 13 24 ~ 1205.21 S 13 55 ~ 1329.58 S 13 44 E 1451.44 2.91 3.09 3.22 1.93 3.20 2.45 0.96 I .47 1.05 0.39 405.76 S 51.62 E 409.03 S 7 15 E 487.62 S 72.41 E 492.96 S 8 26 E 5~6.42 S 99.01 E 594.72 S 9 34 E 699.86 S 123.90 E 710.74 S 10 2 E 816.62 S 147.33 E 829.81 S 10 13 E 941.22 S 177.16 E 957.74 S 10 39 E 208.06 E 1081.05 S 11 5 [ ')~~ 1060.83 S 1181.46 S 238.21 E 1205.23 S 11 23 ~ 1302.15 S 268.69 E 1329.58 S 11 39 E 1420,48 S 298.19 E 1451.44 S 11 51 E 5586.17 4955.00 4900.00 50 16 5742.86 5055.00 5000.00 ~0 21 5899.57 5155.00 5100.00 50 28 6059.78 5255.00 5200.00 52 27 6222.22 5355.00 5300.00 51 41 6386.08 5455.00 5400.00 53 0 6555.67 5555.00 5500.00 54 25 6726.36 5655.00 5600.00 53 6896.31 5755.00 5700.00 54 0 7065.48 5855.00 5800.00 53 30 S 13 49 E 1571.88 S 14 1 E 1692.62 S 13 48 E 1813.01 S 13 g E 1938.07 S 12 51 E 2066.06 S 12 21 E 2195.84 S 11 34 E 2332.80 S I1 2l E 2471.13 S 11 0 E 2508.54 S 10 3~ E 2744.95 0.22 0.65 0.63 0.95 0.51 1.06 0.82 0.65 0.37 0~53 1537.48 S 327.13 E 1571.90 S 12 0 E 1654.61 S 355.95 E 1692.47 S 1Z B E 1771.74 S 385.01 E 1813.09 S 1Z 15 E 1893.3~+ S 414.53 E 1938.19 S 12 20 E 2018.08 S 443.33 E 2066.20 S 12 23 E Z144.72 S 471.79 E Z195.99 S 12 24 E 2278.76 S 499.89 i 2332.95 S 12 22 E 2414.29 S 527.59 E 2471.27 S 1Z 19 E 2549.08 S 554.31 r: 2608.66 S 1Z 16 E 7683.16 S 579.59 E 2745.05 S 1Z 11 E 7232.71 5955.00 5900.00 53 0 7396.61 6055.00 6000.00 51 58 7558.02 6155.00 610'3.00 51 40 7718.48 6255.00 6ZOCl. O0 51 25 7877.98 6355.00 6300.00 51 8036.96 6455.00 6400.00 51 0 8195.55 6555.00 6500.00 50 45 8353.38 6655.00 6600.30 SO 36 8510.49 6755.00 6700.00 50 12 8666.14 6855.00 6800.00 z, 9 56 S 10 26 E 2878.97 S 10 21 E 3008.79 S 10 43 E 3135.46 S 10 51 E 3260.94 S 10 53 E 3385.18 S I1 0 ~. 3508.76 $ 11 7 E 3631.84 S 11 4 E 3753.94 S 10 34 E 3875.09 S 10 23 E 3~94.34 0.56 0.37 0.40 0.40 0.57 0.72 0.40 0.54 0.37 0.85 2814.96 S 604.02 E 2879.03 S 12 6 E 2942.68 S 627.47 E 3008.84 S 1Z 2 E 3067.23 $ 650.70 E 3135.49 S ll 58 E 3190.52 S 674.11 E 3260.96 S 11 55 E 3312.53 S 697.63 E 3385.20 S II 53 E 3433.89 S 721.00 E 3508.77 S 11 51 E 3554.66 S 744.79 E 3631.85 S 11 50 r 3674.48 S 768.3~, E 3753.95 S 11 48 3793.47 S 791.15 E 3875.09 S ll /+6 E 3910.79 $ 812.69 E 3994.34 S 11 44 E 8821.37 6955.00 6goo. Q0 49 43 · 8975.20 7055.00 7000.00 49 12 9128.58 7155.00 7100.30 49 40 9283o31 7255.00 7200.00 50 6 9439.19 7355.00 7300.00 49 58 9594.21 7455.00 7~00.00 49 46 9748.35 7555.00 7500.00 49 19 9900.42 7655.00 7600.00 ~8 24 10051.02 7755.00 7700.00 48 Z~ 10202.30 7855.00 7900.00 48 49 S 10 44 E 4113.04 S 11 5 F 4229.94 S 10 30 E 4346.21 S 9 49 E 4464.26 S 9 50 E 45~3.75 S 10 2 E 4702.13 S lO 33 E 4819.41 S tl 13 F 4933.96 S 10 46 E 5046.57 S 10 25 E 5160.06 0.53 0.71 0.87 1.05 0.70 0.69 1.07 1.71 1.18 0.80 4027.51 S 834.44 E ~113.04 S 11 42 E 4142.28 S 856.66 E 4229.94 S It 41 E 4256.43 S 878.84 E 4346.22 S 11 39 E 4372.60 S 900.02 E 4464.26 S ll 37 E 4490.47 S 920.11 E 4583.77 S 11 34 E 4607.14 S 940.52 E 4702.16 S 11 32 E 4722.58 S 951.38 E 4819.44 S 11 30 E ~835.07 S 983.10 E ~934.00 S 11 29 E 4945.53 S 1004.98 E 5046.61 S 11 29 E 5057.06 S 1026.10 E 5160.11 S 11 28 E COMPUTATION D~TE: 05-MAR-88 PAGE ARCO ALASKA, INC. D.S. 18-11 PRUDHOE BAY NORTH SLOPE,ALASK~ DATE OF SURVEY: 21-SEP-87 ' KELLY BUSHING ELEVATION: 55.00 FT. ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100' FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 10353.92 7955.00 7900.00 48 43 10504.04 8055.00 8000.00 47 47 10651.33 8155.00 8100.00 46 40 10796.00 8255.00 8ZO0.O0 46 15 10940.83 8355.00 8300.00 46 30 11088.51 8455.00 8400.00 48 17 11241.,29 ~555.00 8500.00 49 31 11397.44 8655.00 8600.00 50 58 11557.93 8755.00 8700.00 52 Z 11720.06 8855.00 8800.00 51 45 S 10 48 E 5274.01 S 11 31 E 5385.95 S 12 S E 5494.09 S tl 33 E 5598.64 S 10 23 E 5703.39 S lO 7 E 5812.01 S 11 16 E 5927.50 S 12 53 E 6047.39 S 12 47 E 6172.90 S 13 10 E 6300.49 0.83 0.55 0.81 1.15 1.30 1.84 0.65 0.98 0.64 0.63 5169.06 S 10'~7.17 E 5274.06 S 11 27 E 5278.87 S 1068.94 E 5386.01 S 11 26 E 5384.72 S 1091.09 E 5494.15 S 11 27 E 5486.98 S 1112.82 E 5598.69 S 11 27 E 5589.85 S 1132.66 E 5703.45 S 11 27 E 5696.82 S 1151.79 E 5812.09 S 11 25 r 5810-33 S 1173.15 E 5927.58 S 11 24 ) 5927.50 5 1198.57 E 6047.46 S 11 25 b ' 6049.97 S 1ZZ6.1I E 6172.97 S 11 27 E 6174.33 S 1254.78 E 6300.51 S 11 29 E 11927.00 8983.03 8928.33 51 44 S 12 52 E 6463.03 0.00 6332.73 S 1291.44 E 6463.07 S 11 31 E ARCO ALASKA~ INC. D.S. 18-11 PRUDHOE B~Y NORTH SLOPE~ALASKa COMPUTATION BATE: O~-MAR-88 KELLY D~TE BUSHING OF SURVEY: ELEVATION: ENGINEER: PAGE 21-SEP-87~ 55.00 FT MCBRIDE MARKER TOP SAG RZV6R TOP SHUBLIK TOP SADLEROCHIT TOP ZONE '3 TOP ZDNE 2 G/O CONTACT TOP ZONE BASE SAOLERDCHIT PBTD TD INTERPOLATEO VALUES FOR CHOSEN HORIZONS ORIGIN: 1278 MEASURED DEPTH TVD BELOW KB FROM KB SUB-SEA 10942.0r) 8355.90 8300.80 10991 . O0 8389.31 8334.31 11077. O0 8~4 7.32 8392.32 11213.00 8536.61 8~,81.61 11'318.00 8604.55 8549.55 11~14.00 8665.41 8610.41 11658.00 8816.61 8751.61 11778.00 8890.79 8835.79 11886.00 8957.64 8902.64 11927.00 8983.03 8928.03 FNL, SURFACE LOCATION AT FWL, SEC 19, TllN, R15E, RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 5590.68 S 1132.81 E 5625.86 S 1139.15 E 5688.38 S 1150.28 E 5789.24 S 1168.98 E 5867.66 S 1185.02 E 5940.06 S 1201.44 E 6126.85 S 1243.69 E 6218.69 S 1265.15 E 6301.34 S 1284.27 E 633Z.73 S 1291.~4 E U. ARCO ALASKA, INC. D.S. 18-11 PRUDHOE BAY NORTH SLOPEs4LASKA HARKC_R TOP SAG RIVER TOP SHUBLIK TOP SADLEROCHIT TOP ZONE 3 TOP ZONE 2 G/O CONTACT TOP ZONE 1E BASE SADLEROCHIT PBTD TD C~MPU'TATI ON DATS: ************ STRATIGRAPHIC MEASURED DEPTH BELOW KB 10q42.09 109gl.O0 11077.00 11213.00 11318.00 11414.00 11658.00 11778.00 11886.00 11927.00 05-MAR-B8 SUMMARY FROM KB 8355.80 8389.31 8447.32 8536o61 860~.55 8665.41 8516.61 8890.79 8957.64 8983.03 ORIG TVD KELLY IN= 1278 FNL, SUB-SEA 8300.80 8334.31 8392.3Z 8481.61 8549.55 8610.41 8761.61 8835.79 8902.64 89Z8.03 DATE BUSHING OF SURVEY: ELEVATION: ENGINEER: PASE Zl-SEP-87. 55.00 FK MCBRIDE 431FW REC NO SURFACE LOCATION AT L, SEC 19, TllN, R TANGULAR COORDINAT RTH/SOUTH EAST/WE 5590.68 S 1132.81 5625.86 S 1139.15 5688.38 S 1150.28 5789.34 S 1168,98 5867,66 S 1185.02 5940.06 S 1Z01.44 6126.85 S 1243.69 6Z18.69 S 1Z65.15 6301.34 S 1284.Z7 6332.73 S 1291.44 156, ES ST E E E E E ) FINAL WELL L,3CATION AT TD: TRUE SUE-SEa MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 11927.00 8983.03 8928.03 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 6/+63.07 S 11 31 ,, ,, SCHLUMBERGER O l REC T I ONAL SURVEY COMPANY ARCO ALASKA. INC. WELL O.S. 18- 1 1 FIELD PRUOHOE BAY COUNTRY U.S.A. RUN ONE DATE LOOOED 21 - SEP - 87 REFERENCE. '7262S ~/ELL: D.S. 18-11 (1278' FNL, 431' FWL, 19, TllN, R15E, uM) HORIZTONAL PROJECTION NI:R?H SO00 RE:F 72G26 SCIqLE = ] / 2000 I N/FT 4OO0 SOUTH -4OO0 -2000 0 2000 4000 6000 8000 F.J~T NEL.L: (1278' FNL, 18-11 431' FWL, , 19, TllN, R15E, UH) VERTICAL PROJECTION -2000 0 ~'000 4000 6000 8000 10000 12~0 1~. PROJECTION ON VERTICIql. PLI:kNE 168. - 948. SCCLEO l N VERT l Cl:l. I~PTH6 HOR I Z SCALE = 1 / 2000 IN/FT Itl II ARCO ALA,%'K A ANCHORAGFi ~ AI...A,.~K A ~ATF: 4-2~-RR REFERENCE: ARCO PRE,Si.IRE DATA 4--6-88 BFIF'--XTATIC GR. ADIENT PI..EA£E ~IGN AND RFTURN THE ATTACHED COPY AZ :ECEIF'T OF DATA, CAMCO RI:..'.CE I VED BY HAVE' A NICE PEGGY ATO- ~ ........ t~ AF'F'ROVE][) ...... ,~.~L ..... D~TRTRI. ITIDN CENTRAl... FII..E,.~' CHEVRON '"'-,. I) EXTEN,.~'! ON FXF'L. ORATION · ,,-'"' ECXXON MARATHON "" MOB I I... ~~ F'HII...I...IF'$ F'H WFI. I... FII..FE ~ R ~ I) ~~ ~AF'£~ ~ ~TATF ElF At...A~KA ~~ TFXACO ARCO AI...A~KA~ INC, P..O, BOX tQe~6e ANCHORAGE, AL.A~KA 99548 REF'F.:R. ENCF..: ARCi~ CA,S'ED HOI...F.". F'T. NAI... PWDW2.-.t I' ' ' ""FF' T.N.JE..,II. EIN FR .I IlI...t~E/I'[?HF' S'IJRVF. Y RI.IN klHI..IT Flit-,' ,~AHPI...E-. VFF,'TFTCAI'.TI]N I~'I. IN .S"l' A T .T. C 'l' ~; M F' [!i F~'. ~'T' I.I R' ~ ' F~'I.IN F'I...EA,DE ,~'I]GN AND RE]I'IIRN THE R F.'. C !E I V I~.T) B Y HAVF A NTCJ~' DAY' F:'E(;(.;Y ,C:[I':'Y A,X' I: .:E!:]PI' Or-' DA'rA.. 0i~ & G~s {~o~s. Gommi T E;.'. A N,.~ ~88248 AF:'F'R. OVE:D ...................................................... i) l STR .T. ]NIJT T CAMC..n r.:AMr;O CE:NTRAI... F I I....F..,.S' C I--t [-.', V IR' I[..'1 N .F. XTF.. N,? .T ON EX×ON. HAE'ATNON HI.lB I1... ARCO ALASKA, INC, P~O, BOX t~8~68 ANCHORAGE, ALASKA 995t0 DATE: 4-t5-88' REFERENCE: ARCO CASED I-.tOI...E F]~NAI... "~ :.'!-.-27 4-6-88 ~ 3-27 4-6-88 ~ 4-~ 9 4-9-88 ~ ~' ,~ '- ,,.. 7 -" 8 fi; .,B1 .C. FF'F/CAL I F'F.. R LOG CBT C .F." T F:'F'C F'FC F:'I...EASE S']:(;W AWl)I:;.'!!!:'I'IIF?.N DATA, ,gCH $.C.H ,~' C.I-! ATI...AS ri'TI., nS F~E(;.:~:I'X/FO P,Y ........ I..l A'V' Ii.!: A N I ,aska Oil & Gas Cons. Commission Anchorage · r RAN,.S' :~ .R. 82;5';6 i' "I) ................. (..~ ...................................... AF:'F:'F .lIVE. D 1,9 T Iq: ]: B I.! T :t7 0 N '"'.,-CENI'RAI... . I:: ]: I... r.-.:,'.,;' '" [..I-JE VR (.. N D & M ~" EXTEN,~'ION [.:'XP£ ...... ('~RA'rIoN ~: E X X 0 N M~RA'rHON "' M 0 Iq T I.. ~ .... !::' t..! 'r. t... ;... ]: F' ..t'. F:'R W.F.'.LI... FTI..E".S ,~AF'[.'. ,S"T'AI'E I'.)F' AI...A,.glCA T .FTXAC. O DAI'~: 4-. J 4-8R ~; E:. F. E.F, El N C E AR CO P R E % ..~ IJI. E:. D A T A ,.~'l'Al'I[, ANI.) MIJI..I'T. RATF.:. XI'AI'.IlC AN~ MIII..T.TRAI'F.!' TFXT · '1 .......... AND FcEiI'I..IR.N THE AI'TAP.,HED E, OF Y A,.~ G'E:'f',E:'.l:F:'l' FIF DATA F;E'AR REREIVED BY " I-lAVE A N] .... E DAY! Al'O-- ~F'F'REIV&-. D Alaska 0il & Gas Cons. Anchorage D T ,~ T R T R I IT T 0 N CENTRAl... F' I I...F_',.~' CHEVRON · ,,.'"' I) FFXTEN,T T(]N ".,,. EXXON. '"' MOBIl_ · ~ . ~ F'H T. I...I... T F'X F'R WFI..t. FTL..F.X ~'..-R ~ D ,S'I'AI'E F.)I::' AI...A,.~'k'A "" STATE OF ALASKA ALASKa-..~IL AND GAS CONSERVATION COMMI. ,ON REPORT OF SUNDRY WELL OPERATIONS \, 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate~ Pull tubing Alter Casing [] Other [] 2. Name of Operator ~R£t3 A'laqka; ThC: 3. Address Post .Office Box 100360, Anchoraqe, AK 99510 4. Location of well at surface 1278'FNL, 431'FWL, Sec. 19, T11N, R15E, UN At top of productive interval 1795'FNL, 1627'FWL, Sec. 30, T11N, R15E, UM (approx.) At effective depth 2282'FNL, 1797'FWL, Sec. 30, T11N, R15E, UM (approx.) At total depth 2314'FNL, 1804'FWL, Sec. 30, TION, R15E, UM (approx,) 11. Present well condition summary 11927 feet Plugs (measured) Total depth: measured true vertical 8983 feet 11886 Effective depth: measured 8957 feet Junk (measured) true vertical feet 5. Datum elevation (DF or KB) 55' RKB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 18-11 ~,P 8. Approval number 9. APl number 50-- 029-21181-ol Casing Length Size Conductor 80' 20" Surface 2462' 13-3/8" Production 11025' 9-5/8" Production 1164' 7" Cemented 10. Pool Prudhoe Bay Oil Po~l Measured depth True Vertical depth 110' 110' 2500' 2500' 11062' 8435' 10763-11927' 8234-8983' Perforation depth: measured true vertical Tubing (size, grade and measured depth) 3½", L-80, tbg w/tail @ 11382'MD Packers and SSSV (type and measured depth) 194SAB Pkr @ 10711'Mll & £amcn c;~;~qV 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 1900# Poleset 2400 Sx CS 111 & 400 Sx CS 11 1000 Sx Class G & 300 Sx Class G 13. Prior to well operation Subsequent to operation 11646-11656' 11664-11674' 11686-11706' 11712-11742' 11752-11758' 11762-11776' .. 8809-8815' 8820-8827' 8834-8846' 8850-8869' 8 z -8881-889o.,_ ....... - RECE VED APR i .~as~a Oit & Gas Gores, 6ommissior~ Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2500 1700 0 -- 800 14. Attachments Daily Report of Well Operations ~ Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ,~>,c,7g. Title 0Derations Enaine.~rino Manager Date ~//~/:..~-/~, · ' ~ " Submit in Duplicate Form 10-404 Rev. 12-1-85 14-32/STAT17 M. K. Melton (265-6810) STATE OF ALASKA ALAL , OIL AND GAS CONSERVATION cor~. $SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimu. late [] Plugging ~ Perfgrate [] Pull tubing Alter Casing © Other ~ COMPLETE ...... I ~:/')(~/T'/~ L,~,A$. ~,~----~ 2. Name of Operator 5. ARCO Alaska~ Inc. 3. Address 6. P.0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 7. 1278' FNL, 431' FWL, Sec.19, T11N, R15E, UN At top of productive interval 870' FNL, 1581' FWL, Sec.30, T11N, R15E, UN At effective depth 2299' FNL, 1715' FWL, Sec.30, T11N, R15E, UN At total depth 2331' FNL~ 1722' FWL~ Sec.30~ T11N~ R15E~ UN 11. Present well condition summary Total depth: measured 11927'MD feet Plugs (measured) None true vertical 8983 ' TVD feet Datum elevation (DF or KB) RKB 55 ' Unit or Property name Prudhoe Ba), Unit Well number 18-11 gPN 8. Approval number 7-_~8 & 7-R19 9. APl number 50-- Q2~-211111 - o I 10. Pool Prudhoe Ba}, 0i] Pool EffeCtive depth: measured 11886'MD feet Junk (measured) None true vertical 8958'TVD feet Feet Casing Length Size Cemented Measured depth ~ue Vertical depth Conductor 80' 20" 1900# Poleset 110~HD 110'TVD Surface 2~62' 13-3/8" 2~00 sx CS III & 2500'HD 2500'TVD ~00 sx CS II Production 11025' 9-5/8" 1000 sx Class G & 11062'MD 8437'TVD 300 sx CS I Liner 1164' 7" 300 sx Class G 10763'-11927'MD 8232'-8983'TVD Perforation depth: measured None true vertical None Tubing (size, grade and measured depth) 3-1/2", L-80, tbg w/tail ~ 11382' Packers and SSSV (type and measured depth) SAB pkr ¢ 10711' & TRDP-1A-SSA SSSV ¢ 2211' Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure Oil & Gas c0n . o0mmi§ "I§li ,' Anchorage 12. 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments (Completion Well Hi story) Daily Report of Well Operations~ Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge >,<t~r~-- Form 10-404 Rev. 12-1-85 Title Associ ate Engineer Date (Dani) SW03/61 Submit in Duplicate ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Filial Report" on the first Wednesday alter allowable has been assigned or well is Plugged, Abandoned, or Sold. "Fina! Rel~ort" should be submitted also whell operations are suspended for an indefinite or appreciable length of time, On workovers when an official test ia not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District /County or Parish ARC° Alaska, Inc. II NORTH SLOPE BOROUGH Field Lease or Unit PRUDHOE BAY UNIT I ADL: 28326 Auth. or W.O. no. ITitle AS1606 J COMPLETION Accounting cost center code State DS 18-1~Weu no. API: 50-029-21181 Operator I A.R.Co. W.I. ARCO I 22,0000 Spudded or W.O. begun JDate ACCEPT I 03/09/88 otat number of wells (active or inactive) on this est center prior to plugging and bandonment of this well I if a W.O, JHour Prior atatu~' 2100 Date and depth as of 8:00 a.m. Complete record for each day reported 03/13/88 ( TD:11927 PB:11886 SUPV:SC/WM NORDIC 1 RIG RELEASED MW: 9.3 NaCl NU TREE AND TEST TO 5000 PSI. DISPLACE WELL WITH 8.5 PPG SEAWATER. LOAD TUBING WITH DIESEL AND PLACE 2500' DIESEL CAP IN ANNULUS. DROP BALL AND SET PACKER. SHEAR OUT SUB APPEARED TO SHEAR EARLY. TEST ANNULUS TO 2500 PSI. SET BPV. RELEASE RIG @ 2130 HRS, 3/12/88. DAILY:S48,645 CUM:$2,086,345 ETD:S2,086,345 EFC:$2,030,500 Old TD Released rig New TD Date Classifications (oil, gas, etc.) I Type completion (single, dual, etc.) I Producing method J Official reservoir name(s) Potential test data PB Depth Kind of rig Well no. Date : Reservoir I Producing IntervalOil or gasTest time Pro~tuction I Oil on test Gas per d;~y . , Pump size, SPM X length Choke size T.~. C,P. Water % GOR Gravity Allowable Effective date corrected ., , .~-~The above is correct Drilling, Pages 86 and 87. AR3B-459-3-C Number all daily well history forms consecutively as they are prepared for each well. iPage no. DlvtNon el AtllnllcRIchfleldCompany ARCO Oil anti Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started, Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ARCO Alaska, Inc. Field PRUDHOE BAY UNIT Auth. or W.O. no. AS1606 ICounty, parish or borough ' NORTH SLOPE BOROUGH Lease or Unit ADL: 28326 Title COMPLETION IState AK Well no. DS 18-1~ API: 50-029-21181 Operator ARCO Spudded or W.O. begun ACCEPT Date and depth as of 8:00 a.m. J Date 03/09/88 JHour 03/10/88 ( TD:11927 PB:11886 SUPV:SC/WM 03/11/88 ( TD:11927 PB:11886 SUPV:SC/WM 03/12/88 ( TD:11927 PB:11886 SUPV:SC/WM Complete record for each day reposed NORDIC i 2100 IARCO w.i. 22.0000 Prior status if a W.O. MODIFY BELL NIPPLE MW: 9.3 NACL MIRU. ACCEPT RIG @ 2100 HRS, 3/9/88. ND TUBING HEAD. NU BOP'S. DAILY:S70,400 CUM:$1,500,000 ETD:S1,500,000 EFC:$2,030,500 LOAD, STRAP,DRIFT,CLEAN TB MW: 9.3 NaCl RU AND TEST BOP'S. LOAD, STRAP, DRIFT, CLEAN TUBING AND INSTALL SEAL RINGS. DAILY:S25,300 CUM:$1,730,700 ETD:S1,730,700 EFC:$2,030,500 NU TREE MW: 9.3 NaC1 RAN 364 JTS 9.3~ L-80 EU ABC R-2 IPC TUBING. TAIL @ 11382'. LAND TUBING. INSTALL BPV. ND BOP'S. NU TREE. SSSV @ 2211', SAB PACKER @ 10711'. DAILY:S307,000 CUM:$2,037,700 ETD:S2,037,700 EFC:$2,030,500 The above is correct Signature For form preparatio~Tand distribution, see Procedures M~rj/ual, Section 10. Drilling, Pages 86 ~fnd 87. AR3B-459-1-D Number all dally well history form. consecutively Page no. as they are prepared for each well. I I ARCO Alaska, Prudhoe Bay ~.ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 18-11 Permit Number: 87-87 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/MKM: sd Enclosures cc: Standard Alaska Production Co. File P1(18-11)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B 6132~C STATE OF ALASKA ~"~ ALASK,. OIL AND GAS CONSERVATION COMM,.,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ,rq., Re-enter suspended well '~ Alter casing Time extension F2 Change approved program ~. Plugging ~ Stimulate ~ Pull tubing ,~' Amend order ~ Perforate ~her 2. Name of Operator ARCO Alaska. Inc. 3. Address Post 4. Location 1278' At top of Office Box 100360, Anchorage~ AK 99510 of well at surface FNL, 431'FWL, Sec. 19, T11N, R15E, UN productive interval 1795'FNL, 1627'FWL, Sec. 30, T11N, R15E, UM (approx.) At effective depth 2282'FNL, 1797'FWL, Sec. 30, T11N, R15E, UM (approx.) At total depth 2314'FNL, 1804'FWL, Sec. 30, TION~ R15E~ UM (approx.) 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2462' Production 11025' Production 1164' feet 1927 feet 8983 Plugs (measured) 11886 feet Junk (measured) 8957 feet 5. Datum elevation (DF or KB) 5§' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 18-Zl 8. Permit number g7-g7 9. APl number 50-- 029-711fil 10. Pool Prudhoe Bay 0il Pool Size Cemented Measured depth Perforation depth: measured true vertical 20" 1900# Poleset 110' 13-3/8" 2400 Sx CS 111 & 2500' 400 Sx CS 11 9-5/8" 1000 Sx Class G & 11062' 7" 300 Sx Class G 10763-11927' RECEIVED None Tubing (size, grade and measured depth) 1 II ~ , L-80, tbg w/tail @ 11382'MD A:ask~Oil & ~;as Cons. Commissio~ Packers and SSSV (type and measured depth) Armh0rage 194SAB Pkr e 10711'MD & Camco SSSV ~.2211 12.Attachments Description summa~ of proposal ~ Detailed operations program March 1988 13. Estimated date for commencing operation 14. if proposal was verbally approved Name of approver 15. I hereb.~ertify t,,h/~,t~th~,~or~.~oing_ is true and correct to the best of my knowledge Signed ~¢~./~~ Title Operations Engineering Manager Date Conditions of approval BOP sketch Approved by Commission Use Only ~ue Verticaldepth 110' 2500' 8435' 8234-8983' -.., 14-32/STAT17 M. K. Melton (265-6810) ~tGINAL SIGNED BY L0flNIE C. SMITH Form 10-403 Rev 12-1-85 ~¢proved Oopy Returned. - Commissioner by order of the commission Oate..~/,~ -~ ~'~2 Submit in triplicate Notify commission so representative may witness i Approval No. ~_/~,~,,,~_ [] Plug integrity [] BOP Test [] Location clearanceI DS 18-11 PROPOSED INITIAL PERFORATIONS APl # 50-029-21181 PERMIT # 87-87 ARCO Alaska, Inc. proposes to perforate within the Sadlerochit interval in well 18-11. The proposed perforation intervals are as follows' Intervals to be Shot Shot Density Zone SS Interval 11646-11656 MD 11664-11674 MD 11686-11706 MD 11712-11742 MD 11752-11758 MD 11762-11776 MD 8754-8760 SS 1/2 SPF 2 6' 8765-8772 SS 4 SPF 1 7' 8779-8791 SS 4 SPF 1 12' 8795-8814 SS 6 SPF 1 19' 8820-8823 SS 6 SPF 1 3' 8826-8835 SS 6 SPF 1 9' Ref Log' BHCS 9/12/87 A 5000 PSI WP wireline lubricator and BOP, tested to 4000 PSI working pressure prior to the job, will be utilized for this operation. _ iiiii i ii ii i 11! i i 4 3 i 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) ,3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF Ii,I , '1 IJ W I REL I NE BOP EQU I PMENT ..... St~084006 REV.: LIST OF CO-OWNERS Mr. M. H. Harris Standard Alaska Production Company P.O. Box 196612 Anchorage, AK 99519-6612 Mr. J. C. Bowen EXXON Company, U.S.A. P.O. Box 5025 Thousand Oaks, CA 91359 Mr. T. A. Edmondson Chevron U.S.A., Inc. P.O. Box 8200 Concord, CA 94520 Mr. W. E. Pritchard Mobil Oil Corporation P.O. Box 5444, Terminal Annex Denver, CO 80217 Mr. J. D. Owen Phillips Petroleum Company 8055 E. Tufts Avenue Parkway Denver, CO 80237 Mr. C. A. Dowden Marathon Oil Company P.O. Box 102380 Anchorage, AK 99510 Mr. R. W. Mullins Amerada Hess Corporation P.O. Box 2040 Tulsa, OK 74101 Mr. R. Iden ARCO Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Mr. Robert J. Chebul The Louisiana Land and Exploration Company Western Division 1675 Broadway, Suite 2100 Denver, CO 80202 Mr. S. M. Buchanan Division Petroleum Engineer Texaco, U.S.A. 3350 Wilshire Blvd. Los Angeles, CA 90010-9990 Mr. R. G. Hollis SHELL WESTERN E & P INC. Pacific Frontier Division P.O. Box 527 Houston, TX 77001 British Petroleum Alaska Exploration Company One Maritime Plaza, Suite 500 San Franciso, CA 94111 Attention: Joint Interest Corp. WJP4/IO 295 ¢ 3-11-88; 8:4-8 AN; ~-,~-~.~C~ '* 0U/'I2,-"S70~:~G; P. ~ c-' ,.,. ''.' , .' / STATg OF ALAS~ B,O,P.E. luspec~ion lleport _.~m_e~ "' , ............ .. _ ..... _ _. __- , ,.. - .......... ... ~,~ ...... . ~_ :.:~-:r--m::: ,,,... , - ~ . :... . ............. m. L~ca~ton: S~c ' lq T~R~~ , ~C~sing S~C ~ // ~.~io-, O..,~i~W. il ~t,.~ AZ',~cu~.U~Aro.~7.._'ZL'_ ' S~S~. . ~,~m~_,:_-- _~1 ... ........ Audio::: ....... ~ ru,,l, incr. ~!e~. pre~. 200 p~tg. / TZtp I/ak ~' -Full Charge Pr-ee,ur~ Attained: : , , _ _. 'i--::::L ~:t:-'~::__: ._ - .... ~--~ , . . . · ... -- ....... Gas Dm~mccors . . ....... .:~-~.. - ...... . ................... .__ ..... __. , .,, . ._. . .... -- .......... F!~r_ ![~2al ~ .:-~:'"':.-~,-- '"::'-. ' '"' .... --~' :2 ::::=..::~_. ::~:::::--~-" :::-- Kelly ,nd _S_~ ~ .........__ ...... . ...... -:- .... Upp~ i~ll)' ,~ .. l'~S~ Frassur~~__ _.. amular ~reven~r __ . ..: ....... ~~_..::.: Lou~r Kell~,.===:=.:~~.iasC Prassura ...... . ~:kind Ramm,,, ~~ ~ I..~l,~ BOP U ~ 'ro,~ ?ressure ...... ' OJloka Line Valva~ ~~ ~ ' ' z~,v ._ ,e~t Pze~sur~ ll,C.l. Valve ~~ ~ No, Valves ........ , .... ._ ,,,, .... ,- . ...... Kill Line Valve, 5-~ ~ No flange~ , cl~eck Valve" 5~~ A~Ju-~-~-~ r;i, ek-~~ '" "o -'' I ..... ", l!vdrauj~,,~' r~ed choke ~;4/~ff~ ' : .' · ~.e J C~is~iom o~ice notified. ,,," ~ __ ~: .~ ......,~ ~- ..,q -- - -- -.. . ~--~.~.~~ - _ _ .. -~:..: . - .... .._ ..-,- ......~ ...... ~~ · ~ ~ __-~_:..._;~ .... -.. _ .............. . - ,~ · _ ............... ~ ARCO ALaska, P~O. Box Anchorage, A La.;ka DATE: i 'I --t 2-87 REFERENCE: ARCO Open Hol. e Final.~ ,.~ 8-'1 ~ B-28-87 MWD/HD Run t8-'Ii 8-28-87 Ge~n,, ~, I..og/HD Ru.n i 8-~ ~ 9-t 7-B7 HWD/HD Run t 8-t6, 9-t 7-87 Gert, Eng. Log/MD Run Please .~ien and return ~ ~--'- ~cnomge ATO-i of da+a, TRANE ~876i4 ApprovedI~. DISTRIBLITION Central Fi Le.~ ~,~ Phi LI. ip; Chevron PB Wet Exxon Harafhon ~ Texaco Hob i [ Ana Aha Aha Alaska' 0il & Gas Cons CommIssion Anchorage APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation ShUtdOWn ~ Re.enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order D PerfOrate rq Other [] 2. Name of Operator ARCO Alaska, Inc 3. Address P. 0. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, 431' FWL, Sec.19, TllN, R15E, UN At top of productive interval 1795' FNL, 1627' FWL, Sec.30, TllN, R15E, UM (approx) At effective depth 2282, FNL, 1797' FWL, Sec.30, TllN~ R15E~ UN (approx) At total depth 2314' FN'L, 1804' FWL, Sec.30~ TllN, R15E~. UN (approx.I 11. Present well condition summary Total depth: measured I 192'7, MD feet Plugs (measured) true vertical 8983 'TVD feet Effective depth: measured 11 886 ' HD feet true vertical feet 8957 ' TVD Casing Length Size Conductor 80' Surface - 2462' Production 11025' Li net 11 64 ' 20" 1 3-3/8" 9-5/8" 7" Junk (measured) 5. Datum elevation (DF or KB) RKO 50 ' feet Perforation depth: measured None true vertical None Tubing (size, grade and measured depth) None [ ackers and SSSV (type and measured depth) one 6. Unit or Property name Prudhoe Ba,y Unil: 7. Well number 18-11 8. Permit number R7 -R7 9. APl number 50-- o29-~ ~ 10. Pool Prudhoe Bay 0il Poot None None Cemented Measured depth WueVerticaldepth 1900# Poleset 1lO'ND 110'TVD 2400 sx C5 III & 2500'ND 2500'TVD 400 sx CS II , 1000 sx Class G 11062'ND 8435'TVD 300 sx Class G 10763'-11927'ND 8234'-8983'TVD RECEIVED OCT 2 r, Rlaska 0il & Gas Cons. Commission Anchorage. 12.Attachments 13. Estimated date for commencing operation Narch, 1988 Description summary of proposal [] Detailed operations program [] BOP sketch [] 14. If proposal was verbally apprOved Name of approver Date approved 15. I hereby certify that the foregoing is true and Correct to the best of my knowledge_ Signed ~ ~ ~~,~, Title Assoc,ate Engineer , Commission Use Only (Dan~ ) SA2/98 Conditions of approval Notify commissiOn so representative may witness Approved by Form 10,403 Rev 12-1-85 Date I Approval No. [] Plug integrity [] 'BOP Test [] Location clearance '1 ~ ~)/ r , R,turned by order of '/ I Commissioner the commission Date ~ ~ Submit in triplicat~ ARCO 01! and Gas Company ~) Well History - Initial Report - Dally Instn~tlons: Prepare and submit· the ~"lnitill Rel~d" oM the first Wednesday after a well is spudded or workover operations are started. Dally work prior to sPudding should be summarized on the form giving inclusive dates only, County. parish or borough IState DistrictAlaska J North Slope Borough J Alaska ILease or Unit - Iwe, no. Field I' ' ADL //28326 I 18-11 Prudhoe Bay . Auth. or W.O. no. I [Title AS1606 /~¢-dr'i l l Rowan ~41 APl 50-029-21181 Operator IA.CO W.I. ARCO Alaska, Inc. Spudded or W.O. begun IDate ]Hour IP"or status 'f a w.o. Redrill 8/28/87 2300 Hrs. Date and depth as of 8:00 a.m. 8/28/87 thru 8/31/87 9/01/87 9/02187 9/03/87 9/04/87 Complete record for each day reported 13-3/8" @ 25~' 4087', (1439'), DD Wt. 9.1, PV 7, YP 12, PH 8.5, WL 20, Sol 5 Accept rig @ 2300 hfs, 8/28/87. ND tree, NU & tst BOPE. RIH, DO cmt f/2333' L 2450'.-Tst csg to 2000 psi. Xst formation to 10.95 ppg EMW. DD f/2650'-4089'. 2841', 3.6°, S19W, 2840 ;VI), 4 VS, 6S, 8W 3211', 13°, S21W, 3207 TV]), 48 VS, 51S, 12W 3586', 25.2°, SllE, 3565 TVD, 160 VS, 163S, 4W 13-3/8" @ 2501~ 5265', (1176'), PU logging colt Wt. 9.2, PV 5, YP 12, PH 8.5, WL 21, Sol 5 Drl to 5265', POOH, chg BHA. PU logging colt. 3949', 34.8°, S13E, 3875 TVD, 347 VS, 346S, 40E 43'17', 48.7°, S13E, 4149 TVD, 591 rS, 583S, 102E 4687', 52.4°, Sl4E, 4387 TVD, 875 rS, 859S, 165E 5154', 51 4°, SlSE, 4079 TVD, 1239 rS, 1212S, 254E 13-3/8" @ 25~' " 6387', (1122'), RIH w/new bit Wt. 9.4, PV 10, YP 7, PH 8, WL 12, Sol 5 RIH, wsh thru tight spots. Drl to 6387'. 5335', 50.5°, S14E, 4793 TVD, 1379 rS, 1348S, 290E 6257', 52°, S13E, 5376 TVD, 2093 rS, 2042S, 460E 13-3/8" @ 250~' 7634', (1247'), Drlg Wt. 9.4, PV 9, YP 8, PH 8.5, WL 8.4, Sol 5 Drl to 7634'. 6534', 54.3°, Sl3E, 55'43 TVD, 2315 rS, 2258S, 512E 7343', 52.1°, Sll.3E, 6024 TVD, 2965 rS, 2895S, 642E 13-3/8" @ 250~' 8445', (811'), Drlg Wt. 9.5+, PV 11, YP 6, PH 8, ~ 8, ~ol. 5 Drl to 84'45'. 7665', 51.4°, S12E, 6224 TVD, 3218 VS, 3143S, 693E 8313', 50.7°, Sl0.SE, 6632 TVD, 3721VS, 3636S, 791E 21.66~ RECEIV. D OCT 2 'c.,- Alaska Oil 8, Gas Cons. Commission Anchorage The above Is correct Signature <~ Date 10/13/87 ]Title For fo~;m preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Supervisor ARCO Oil and Gas COmpany Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or'perf0rating, show formation name In describing work performed, N~mber all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerlm" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weeklY for. workovers and following setting of oil strin§ until completion. District Field Alaska Prudhoe Bay County or. Parish Lease or Unit North Slope Borough ADL #28326 IState Alaska IWell no. 18-11 9/05/87 thru 9/08/87 'complete record for each day while drilling or workover in progress 13-3/8" @ 250~' 11,085', (2,640'), Prep to rn 9-5/8" Wt. 9.8, PV 13, YP 9, PH 8, WL 7.6, Sol 8 Drl & surv to 9950', 15 std short trip. Drl to 11,085' short trip, C&C, POOH f/9-5/8" csg. 8,664', 49.9°, S14E, 6856 TVD, 3991VS, 3900S, 849E Date and depth as of 8:00 a.m. 9/09/87 9,277', 50.1°, 9,859', 48.6°, 10,166', 48.8°, 10,475', 48.3°, 10,805', 46.4°, 11,009', 47.7°, S13E, 7254 TVD, 4457 VS, 4353S, 966E S13.8E, 7632 TVD, 4900 VS, 4784S, 1061E S13.1E, 7834 TVD, 5130 VS, 5008S, lllSE S12.1E, 8039 TVD, 5362 VS, 5234S, 1165E S 9.8E, 8262 TVD, 5605 VS, 5473S, 12lIE S 8.8E, 8401TVD, 5754 VS, 5620S, 1235E · 15 std 9110/87 9/11/87 9/12/87 thru 9/14/87 The above is correct Signature For form preparation and distribution see Procedures Manual Section 10. Drilling, Pages 86 and 87 9-5/8" @ 11,062' 11,085', (0'), PU 8½" BHA Wt. 9.8, PV 14, YP 8, PH 8, WL 8.2, Sol 9 RU & rn 264 its, 9-5/8", 47#, L-80 csg w/FS @ 11,062', FC @ 10,976'. Cmt w/1000 sx C1 "G" w/.25% R-5 & .75% D-31. Displ using rig pmps, bump plug. Instl & tst packoff to 5000 psi. Tst BOPE. PU 8½" BHA. 9-5/8" @ 11,062' 11,454', (369'), Circ Wt. 9.2, PV 10, YP 5, PH i0, WL 8.2, Sol 4 RIH w/8½" BHA, tst csg to 3000 psi. DO cmt & 10' new hole. Conduct formation tst to 11.6 ppg. Drt to 11,454'; lost rrna. Circ @ csg ~hoe to lower mud wt. RECEIVED OC'I" 2 9-5/8" @ 11,062' 11,599', (145'), RIH w/rev jet bskt Wt. 8.9, PV 9, YP 4, PH 8.5, WL 8.4, Sol 3 · , PQ · 1 t Circ & lower mud wt to 9 0 ppg. RIH drl to 11,599', .~~ 1 cone.. PU rev jet bskt, RIH, circ & lower mud wt to 8. & Gas Cons. Commission RIH Co retry cone. Anch0mge 11,550', 51.8°, S12E, 8749 TVD, 6168 VS, 6027S, 1312E 7" @ 10,763'-11,927' 11,927', (328'), Std back 3½" DP Wt. 8.9, PV 9, YP 6, PH 8.5, WL 7.8, Sol 3 TIH w/jet bskt, rec'd 3 pieces of cone. Drl to 11,871', short trip f/logs, circ, POH. RU DA, rn BHCS/CNL/GR f/11,798' WLM - 11,078', RD DA. Drl 56' rat hole, short trip, circ, POOH. RU & rn 26 its + 1 double short jt, 7", 29#, L-80 csg w/LC @ 11,801', FC @ 11,886'' FS @ 11,927', TOL @ 10,763'. Cmt w/300 sx C1 "G" w/3% gel & 1.5% FL-28. POOH, LD BHA & DP. 11~871'~ 51.5°~ S12E~ 8948 TVI)~ 6419 VS~ fi273fl~ 13fi4E I Date /Title 10/13/8] Drilling SuperVisor ARCO Oil and Gas com pany Daily Wdll History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District ~County or Parish Alaska Field ~tease or Unit Prudhoe Bay Auth. or W.O. no. [Title AS 1606 I Rowan #41 Operator I A.R.Co. W.I. ARCO Alaska, Inc. 21.66% Spudded or W.O. begun ~ Date Redrill I 8/28/87 North Slope Borough ADL #28326 Accounting cost center code State Alaska IWell no. 18-11 Completion AP1 50-029-21181 I otal number of wells (active or inactive) on this, Dst center prior to plugging and I bandonment of this well our I Prtor ataiu~ If a W.O. 2300 Hrs. I Date and depth as of 8:00 a.m. 9/15/87 9/16/87. 9/17/87 Complete record for each day reported 7" @ 10,763'-11,927' 11,927', (0'), CO 7" Lnr Wt. 8.9, PV 11, YP 15, PH 11.5, WL 11.5, Sol 3 PU 3½" DP, stand back. RIH w/9-5/8" scraper, CO to TOL, circ POOH. RIH w/6" bit & 7" scraper, CO 7" lnr. 7" f/10,763'-11,927' 11,886' PBTD, (0'), ND BOPE 9.3 ppg brine Drl cmt to 11,886'. Displ well to 9.3 ppg brine. ND BOPE. POOH, LD DP. 7" @ 10,763'-11,927' 11,886' PBTD, (0'), RR 9.3 ppg Brine w/diesel cap Fin ND BOPE. NU 7" tbg head adapter. hfs, 9/16/87. Instl BPV. RR @ 1230 Old TD New TD 11,886' Released rig Date 1230 Hrs. Rotary Classifications (oil, gas, etc.) Oil Producing method Flowing Potential test data PB Depth Kind of rig 9/16/87 IType completion (single, dual, etc.) Single · Official reservoir name(s) SadlerOchit Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas 13er day Pum'p size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature IDate ITM 10/13/87 Drilling Supervisor For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR[...'.() A Lm.s:km, Inc=. I::',0, Box t00L'~60 Anchormge, A I.a.skm 99.5< DATE' t 0-1-87 RI~"FEF~'.ENCE ' ARC(] Open i.-IoLe F'ina L~ ~ 9-~2-8'? Compen.s'~ted Neutron/GR Run ~, 2"&5" 9-'-~2-87 BHC Acou~ti Log/GR Run t,. 2"&~" ~~ 9-~2'-87 Gmmmm Ra~ Log F(I~ t 5' AtLas PLea.se $igY! and return +.he attached copy a~ recei~f Received By ~pproved P,O, Box t Anchorage, ALaska DATE REFERENCE: ARCO Cased Hole Fina[ 3-7 9-2e--87 Bottom Hole £tatic Pressure Run 2, 5" 9-28-87 Bottom ftote. 5'$a~ic F:'~-e~sure Run 2, 5' 9-2t -87 CET Run ~, 5" ~-2t-87 CBT Run t, 5" 9-~9-87 Noise/Temperature Log ~un t, 2' ,~' c h S'ch ,.~': h S'ch ign a~3d retur h ' . )~;~ ~s - ' data Received By___ HA V E A N ]'. C E D A ~ Alaska 0il & Gas Cons. Commisdor~ Anchorage Record.s Processor ATO-t 529 TRANE ~B750=.~; ~ Approved .... · "' ~ Ph i t Lip $ T Central Fi Les ~, ~ Chevron PB We[ [ I~i les D & M R & I) .'"' Ex'ten.sion ExpLoration ~ $~; ~~ Exxon ~ , ~ State of Ata~ka ~ Texz:~co Marathon , ~. Hob i [ ARCO ALaska, Inc. P.O, 'Box' 1ee:36e Anchorage, ALaska DATE: ?-22-8T REFERENCE: ARCO' Magnetic Tapes w/Listing Magtape ECC~3t84 OH At [as -~~-/~p ?~?- //~/ return the m~tmched copy as receipt of data. PLease sign and . RecOrd.s F roces..,or ATO-. ~52~F TRANS ¢.7487~ Approved DISTRIBUTION · ,r (,,:.)Cen'l:raL Fi Les' - Chert c~') :- .... D &M ~ (4)P. McPheefer~s ~r~ EXXOll M a r a 't h o ~'~ Mob i L · ,.-"'Phi LLips .... P-~:-We I.t. F i I.e.~ ~ - ~. R& D ~" SAF'C 'Texaco Anchorage, ~ l. as:ka 995:t ~) REFERENCE: :~:0' Cns;e~ FIo Le F'ina L 8=25.-87 Temp /GR/.,CL. Log Run t, .5" $ch Plea.se s'ign and return fhe a'l'fached cjOpy a~ receipt of clara, Rece i ved By .................. 9 HAVE A N:[CE DAY~' ( / ~~ ~! & Gas Oons. Commi~ion "'~ F' ~chorage T R AN $ .,,. o /~ -~-o7455 Approved, ..................................................................'.~_ I) I ""' ,.-.. 1 R I B U T :[ 0 N · .-'"' C e¥~ '~'r a L F: i- L es;' ....................... F~:; L L i P .<; - ' C h e v r o ~ D &. H E: x t:. e n ::-: i o n E x p t. o'r a 'l' i o n E x x o n H a r a '1' h o n Hob i L ARCO Alaska, Inc. P-,O. Box t00S60 .... Anchorage, ALaska 995t0 DATE' August .3i~,;- i'987 - REFERENCE: ARCO ca~ed Hole F)na[ (~ ~miC 0 PLea.se ~ign and ret'urn '~he a'~t~'.~ched copy m.s' receil~'~ of data, CentraL F:i Le.s Chevron D" [..]xti~'n~ion ExpLorations' Exxo. n '-'. H;~ra t h 0'~ Mob i L Phi LLip~ F:'B Wel. L Fi I.e.s' · "" So'h io ' '"' '¥'e×aco · REPORTOF ' SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown'lq Stimulate [] Plugging. [] Perforate [] Pull [] ng [] Other~ WELL DE$1GRATION CHAI~GE tubing Alter Casi 2. Name of Operator ARCO Alaska, In~, 3. Address P.O. Box 100360 Anchorages AK 99510-0360 4. Location of well at surface 1278' FNLs ~.31' FWLs Sec.19s T11Ns R15Es UN At top of productive interval 1795' FNLs 1627' FWL~ Sec.30~ T11Ns R15E~ UN (approx) At effective depth 2282' FNL~ 1797' FWLs $ec.30~ T11Ns R15Es UN (approx). At total depth 231~+' FNL~ 180~+" FWL~ 5ec.30~ ,T11N~ R15E.~ U,N (approx) 11. Present well condition summary , Total depth: measured feet true vertical feet Plugs (measured) 5. Datum elevation (DF or KB) RKB 50 w 6. Unit or Property name Prudhoe Bay Unit 7. Well number 18-11 8. Approval number 7-~R .' .,. .. , ,. .... 9. APl number 50-- 029-21181 10. Pool Prudhoe Bay 0il Pool Feet True Vertical depth Date /O-/.~'-Z~7 Submit in Duplicate Effective depth: measured feet true vertical feet casing Length Size Junk (measured) Cemented Measured depth ARCO Alaskas Inc.s has changed the well designation from "EXxon:Tract Well 19-11-15" to "DS t8-11", Perforation depth: measured true vertical Tubing (size, grade and 'measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary eCEI.VED 13. N/A Intervals treated (measured) OC~" co Treatment description including volumes used and final pressure J~Jas~r30J! & Gas Certs. N/A Representaiive Daily Average Production or Injection Data ~*uhorage - ' . OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure .Prior to well operation Subsequent to operation i , 14. Attachments None Daily Report of Well Operations [] Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correc't to the best of my' knowledge Form 10-404 Rev. 12-1,85 Title Associate Engineer (, J G )' 5WO2/110 ; "" ~ ' STATE OF ALASKA ~ AL~(A OIL AND GAS CONSERVATION CO~:,._~-~ISSION APPLICATION FOR SUNDRY/ I PROVALS 1. Type'of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tul~ing [] Amend order [] Perforate [] Other 2. Name of Operator ARCO Al'aska, Inc 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 1278' FNL, ~31' FWL, Sec.19, T11N~ R15E~ UM 5. Datum elevation (DF or KB) R KB 5 6 ' feet 6. Unit or Property name Prudhoe Bay Untl; 7. Well number ~_~ l~{>ll ac ~ ,, At top of productive interval N/A At effective depth 1278' FNL~ ~31' FWL~ Sec.19, TllN~ R15Es UN At total depth 1926' FNL, 7~2~'' FWL, Sec.19, T11N, R15E, UN 11. Present well condition summary Total depth: measured true vertical ~ 509 ' N D feet i[.31 5 ' TVD feet Plugs (measured) 8. Permit number 84-156 9. Apl number 50_.02 9- 21 1 81 10. Pool Prudhoe Baby 0ii Pool 2211 '-2900' Effective depth: measured 232~ 'ND feet true vertical . 232~'TVD feet Junk (measured) None Casing Length Size Cemented Measured depth True Vertical depth Conduc1;or 80' 20" Surface 2~62' '13-3/8" 1900# Polese1; 2~00 sx CS III ~00 sx CS II 110'ND 110'TVD & 2500'ND 2500'TVD Perforation depth: measured None true vertical None Tubing (size, grade and measured depth) None Packers and SSSV (type and measured depth) None RECEIVED AUG 1 8 1987 Naska 011 & Gas Cons. C0mmissi0n Anchorage ~ 12.Attachments Description summary of proposal [] Detailed operations program r--I BOP sketch [] 13. Estimated date for commencing operatiOn Sept. ember ~ .1 987 14. If proposal was verbally approved Name of approver Subsequent Work llepo~ed on Form No./~ - ~/OZ/Dated.~//__~/~ Date approved 15. I hereby certify tha.t/~ fore~oing is true and correct to the best of my knowledge ~ / J Signed ~ /~. ~,........- TitleAsso.ciate Eng,~neer Date ~//7/J:Y7 i C n mt, n f r v'~ i .~;r Commission Use OnlY ~.~EM) SA2/81 I / ' o d' 'o s 0 app o a Not'fy con'mission so representative may Wit'nes~ I APproval No. '7 i"'"'5 ~ - [] Plug integrity [] BOP Test [] Location clearanceI /'- -.~.0 6 ~, , ~ ~.~, .... ~"zJ~ by order of Approved by ~, L~. J;. ,~jJjJJj:j . Comr~i~ th...e commission Date ,~-"/z]'~ 4/~ Form 10-403 Rev 12-1-85 Submit in tripr]cate~ SUNDRY APPROVAL EXXON TRACT WELL 19-11-15 ARCO Alaska, Inc. proposes to rename the above well DS 18-11. It is planned to re-enter and drill the well as DS 18-11 to a Sadlerochit TD. PD2/42d 8/6/87 RECEIVED AUG 1 B 19B7 011 & Gas Cons. Commission Anchorage STATE OF ALASKA ~3 A. LASKA'(~.:.~-Ji~AND GAS CONSERVATION CO ISSION PERMIT TO DRILL ./ 20 AAC 25.005 "-E'xxo,~ T~14¢1~; ~11 I~l°,' ' la. T~pe of work Drill ~ Redrill ~1 lb. Type of well. Exploratory ~ Stratigraphic Test ~ Development Oil Re-Entry ~ Deepen~ Service ~ Developement Gas ~ Single Zo~e ~ Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska~ Inc. RKB 50~ PAD 17'GLfeet Prudhoe Bay Field 3. Address 6. Property Designation Prudhoe Bay 0~1 Pool P.0. Box 100360 Anchorage~ AK 99510 ADL 28326 ALK 232~ 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1278'FNL, ~31'FWL,Sec.19,T11N,R15E,UN(approx) Prudhoe Bay Uni~ Statew~de At top of productive interval 8 Well nu b ~ Number 1795~FNL~ 1627 ~ FWL~Sec. 30~T11N ~R15E~UN (Producer~ ~8088-26-27 At total depth c~~&~ ¢~~&,~ ~ ~,¢.fi.. 9. Approximate spud date Amount ~'FNL~ ~FWL~Sec.30,T11N,R15E~UN ~-~7 09/01/87 $500~000 [3e' I 17 ~' 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in prOperty 15~ Proposed depth(MD and TVD) property line ( pl anneal ) 2060.'ND ~31' ~ surface feet 18-12 111' ~ 1182'.~ 2560 (9006~TVD} feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.03~ Kickoff depth 2700' feet Maximum hole angle 510 Maximumsudace ~020 pslg At total depth CVD) ~00 pslg 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 12-1/~' 9-5/8" ~7~ L-80 BTC 11~5~ 31' 31' 11176 8~60~ 500 sx Class 8-1/2" 7" 29~ ~L-80 B'TC 1160' ~10900' 8286' 12060 9006~ 300 sx Class 19. To be completed for Redrill, Re-entry, and~eepen Operations. Present well condition sum~qry ~&~[ll~-'~"&~ ~c~+ ~"- ¢ff'~ ~ ~R~ p~U ,,~~ ' Tota'l d~pth: " measured ~509 'ND feet Plugs (measured) 2211 ' -2900 ' true vertical ~ 31 5 ' T V'D feet Effective depth: measured 232~ 'ND feet Junk (measured) None true vertical 232~ 'TVD feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 80' 20" 1900~ Poleset 110~ 110' Surface 2~62' 13-3/8" 2~00 sx CS II I & 2500~ 2500' ,n,ermed,ate ,, RECEIVED Production Liner Perforation depth: measured AUG Z 8 ]987 true vertical N~k~ 0il & Gas Cons, C0mmlssi0n 20. Attachments Filing fee ~ property plat' ~ BOP Sketch ~ Diverter SketcA~0r~lling program Drilling fluid program ~ Time vs depth plot ~ Refraction analysis ~ Seabed report ~ 20 AAC 25.050 requirements 21. I hereby certify thane f~egoing is true and correct to the best of my knowledge Signed ~~ ~ Title Reg,ona1~Dr,11~n, Eng,neer Date~/I,/~ ~ I ~ Commission Use Only~~ (TE.~, "": '" ~ Permit NumberF7- ~7 50--0 ~q - ~t,:~.8:~'OO 08/24/87 for other requirements Conditions of approval Samples required ~ Yes ~ No Mud log required ~ Yes ~No Hydrogen sulfide measures ~ Yes ~ No Directi6nal.survey required ~ Yes ~ No Required working p~ure f~ B~ ~; ~ 3~ ~ 5M; ~ 10M; ~ 15M Other: //~//~ By ordor of Approved by t ~ '/' L ', ~~~ Commissioner the commission Dat Form 10-401 Rev. 12-1-85 , ate DS 18-11 PROPOSED DRILLING PROGRAM 1) MI and RU drillin§ rig. 2) NU and test 13-5/8" 5000 WP RSRRA preventer. 3) Tag cement plug at 2324' and circulate brine and diesel from well. 4) Drill out cement to 2450' and test casing to 2000 psi. 5) Drill out to 2630' and perform leak off test. Drill to 2700'. 6) PU 12-1/4" directional assembly and build angle to about 51° at Sl1°41'E. Drill to the top of the Sadlerochit at about 11192'MD. 7) Set and cement 9-5/8" casing with 500 sx Class G. 8) Test casing to 3000 psi and drill out. Perform leak off test. 9) Drill 8-1/2" casing to TD of about 12060'MD. 10) Run open hole logs. 11) Set and cement 7" liner with 300 sx Class G. 12) Clean out cement and test casing and liner to 3000 psi~ '" 13) Displace mud with completion brine and release rig. 14) Run cased hole logs. 15) Complete well with 3-1/2" tubing. 16) Perforate and stimulate as necessary. PD2/42a RECEIVED AUG 1 8 1987 Oil & Gas Cons. Commission Anchorage NOTE: a) In accordance with Area Injection Order No. 4, excess non-hazardous fluids developed from well operations and as necessary to control fluid level in reserve pit will be disposed of down the 9-5/8" x 13-3/8" annulus. The annulus will be left with a non-freezing fluid during any extended interruption in the disposal process. The annulus will be sealed with 300 sx of cement followed by Arctic Pack upon the completion of the fluid disposal process. b)~ Existing wells within 200' of the proposed well are: DS 18-12, 111' @ 1182'TVD. c) The drilling fluid program and fluid surface system will conform to the regulations set forth in 20AAC25.033. d) Maximum surface pressure is based upon BHP and a full column gas to TD (0.10 psi/ft). PD2/42a RECEIVED AUG 1 8 ]987 Oil & Gas Cons. (,~mmission Anchorage Depth (TVD) DS 18-11 MUD PROGRAM Plas Yield Density Visc. Point Initial IOM g/gal (CP) #/100 ft2 Gel Gel FL % CC/$OM Oil Solids pH and Type of Mud 13-3/8" 8.8 Minimum 2 2 5 25 Csg Shoe to Possible to to to to to 9.4 4 5 10 10 K-lO 3.5 to 6.5 Low sol ids/ non-dj spersed Operate all solids removal equipment to maintain weight as low as possible. K-lO 9.2 10 6 4 8 15 to TD to to to to to to (9-5/8" 9.8 20 10 8 12 10 Csg Pt) 4 to 8 pH 9-10 Low sol ids/ non-d i sper sed 9-5/8" 9.2 10 6 4 8 15 Csg Shoe to to to to to to to TD 9.4 20 10 8 12 10 4 to 8 pH 9-10 Low sol ids/ non-dj spersed EQUIPMENT - DRILLING FLUID SYSTEM 1. Degasser 2. Shakers 3. Pit level indicator (with both visual and audio warning devices) 4. Drilling fluid flow sensor (with readout convenient to the driller's console) 5- Trip tank 6. Agitators 7. Mud cleaner and centrifuges PD2/42b 8/10/87 RECEIVED AUG 1 8 1987 0il & Gas Cons. ~ommis$1orl Ant, borage RECE AUG 1 PIT 7 PIT 3 WATER TANK DS 18 TYPICAL MUD PIT SCHEMATIC AGITATOR AGITATOR AGI PIT 4 PILL PIT DESILTER , . . ? :ATORS PIT 2 SAND TRAP AGITATORS PIT 6 AGITATOR PIT 5 DEGASSER m SNAKERS CUTTINGS CONVEYOR I I AGITATOR I CENTRIFUGE '[~ i i PIT I DEGASSER NaSkaOil& Gas Cons. Commission (DRAWING NOT TO SCALE) A~0r~stem is equipped with a drilling fluid pit level indicator with.both visual and audio warning devices located in the immediate area of the driller's console. 2. System is equipped with a drilling fluid flow sensor with a read-out convient to the driller's console. HOLDING T~ !ili !i~ 0 1000 2000 3000 4000 5000 6000 7000 8000 I _ 0 ' ' ' ' ' ' ' ' ' ' ' ' ' ~ ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ~ ' ' ' ' ' ' ' ~ ~" ' ' ~ ' ' ' ' ' ' ' ' ' ' ,,,,,,,,,,, o ooo , ooo ARC 3-ALA,SKA, INC. 2000 . ~ "ICA[~ I IN = 1aaa Fl. '2000 SHL: 1278, FNL, 426' F~ IL, ~ SEC: 1~, r11N, R16E, ~ M (OP TVD = 2~ THL: 2140' FNL, 1700' F~ ~L, 2.5 3000 7~ . ~FC: ~a. r~_ R~RF~ ~JM 3000 12.5 17.5 22.:, 27,5 ~ 2.5 ~000 ~ ~/.b ~000 ~2.5 ~7~,e E~ tC TVD - 4~()1 MD -- 4778 DEp. 875 ~15 TVO -- ~710 MD -- 5110 DEP - 114~) 5000 · , .... ~ 11 DEG 48'M N E 6000 , , ~ .,~.~...,. , , , '.-~0 *~ - *~aO M~ -- ~an Dfi~. ~0~ ~a ~ ..... 7000 K-Ii TVD - 756C MD - 9720 )EP - 4764 8000 ' LCU T~ O -- 8138 ME ~ 10650 DEl' -- 5496 ~ ~ 8000 SAG RIVE[R TVD ~ 8365 MD -- 1102~ DEP - 5787 SHUBUK TVD 840~ MD -- 11083 DEP ~6838 -- 8-6/8' CASl;~G TVD = 841}.O MD = 1117~1 DEP= 590l lOP SADLEROCHIT TVD = ~~=11' 92 DEP = 59:,1 G/O C;3NTACT TVD = 8870 MD = 11515 DEP = 6175 ~ BASE SADL~Rb~Y ~D ~'~4~--~lD ~-i~6~1 [P ~ ~24 '" ~ 9000 .TD T VD - 9006 biD - 12060 D ;P - 6602 R['CEIVE ) ............ A[IG [ 8 ]987 N~ 0il ~ eas Cons. C~mmissio~ ............................. ~ ..... I,' ....' .... '," ~',". ...... 0 1000 2000 3000 ~000 5000 6000 7000 8000 VERT I OflL SECT ~ 0N 7000 9000 10000 ~ 11000 5000 6000 ~,~ E - H. COORDINRT~S '~ 0 -2000 - ! 000 0 ! 000 2000 3000 4000 5000 · ' ~ 48 0$18- 0 RECEIVED CD 0 CD , oo AUG 1 8 1~ 87 I Alasl~ Off & Gas Cone Oommlsslal Anohorag~ -2000 - 1000 0 100O 2000 3000 4000 5000 F" - I^l NNNI:;)n T kllqTIC'q o -2000 0 o o o o o -1000 £ - N O00ROINBTP. S 1000 2000 3000 4000 5OO0 i i ! i i i ECEIVi D Gas Cons. i i i ! i ! -2000 -1000 0 1000 2000 3000 4000 5OO0 P. - N COOROINRTP. S i~~ii~ ~f' ~F.- H O00ROINB?F.S / ~-~oo -~oo o ,oo ~.oo~oo ,,,oo CD w ! I I -200 -100 0 100 200 300 400 5OO . . ~~7 . 196 BS15-12 3 ..... 577; t31 . , , ~ ~o9s ~ECEIVED . i ~ AUG 1 8 198' i ~ 1 ~ Alaska 1il & Gas Cons. t ommi~ion Anc~rage ......................... ~~ ................ , ............. 5OO E - 14 COOROINfl'I"ES I I i I II ~oJn~,.. acor C~DKicy Test 1. Check and ~£L1 acoJm~aCor reservoir co p~r level ~ch ~l~c ~d.. Z. ~s~ ~c K~ator ~s~e ~s 3000 psi with ~SO0 ~ ~c~m ~. ~m c~, cmn cZo~ p~ss~. le Fill ~OP stack and nazcLfold v~ch a non- liquid. Check chic all hold dram sm a31 ~ly retracted. pr.h ~.m cesc plu~ on ~t11 p~.pe an~ seat Ln $. Close anmZa~ preventer aM upacremt valves. 4. l:un~immlly cest chokes, .s. ,.In each of the ~ol~_ovt~ cesu, first hold a ZSO pst AQv pressure celt ~r a ~ o~ 3 miz~es · chon cesc ac oho high pressure. 6. tncTum Wusure co ~ ~ ~ ~X~ ~r a ~ 7. ~ ~~ ~~er ~ clm of pi~ le~c 3 ~. ll~ ~sm co c~. ac ~euc 3 ~es. SX~ ~sm co ce~. 0. ~n cop se~ of pi~ ~ c~ clo~ ~ sec of px~ r~. ~~ p~s~ co 5000 psi ~1~ c~ with ~000 psi ~scTem of val~ ~ ze~ p~ss~e SI~ ~ess~e co ze~. ~ ~ccm ~c of ~ o~f ~g jo~c ~ ~1 o~ off ~le. Close bl~ r~ ~ cesc co SO00 psi ~or ac leuc 3 ~ces. BI~ press~ o~ all ~~C. ~ bl~ r~. ~z~g ~i~d ~ all v~ves ~e ~c ~ ~ill~ Test s~i~ valves co $000 psi. ~ ~aCi~ ~ ~ser. RECEIVED AUG 1 8 1987 Naska Oil & Gas Cons. Commission Anchorage (3) Ad,dh ~ 1 Is the permit fee attached ' 13) (1~ r.=u 22) '(z3 = 28) (6) Ull~ ~31) 2. Is ~ell 1:o be located in a daf/ned pool ............................. ~ .3 Is w~ll located proper dis~e frc~ ~erty 'line ' 4 Is well located proper d~-~tance from oth~ w~lls · 5. Is sufficient undadicated acreage ~le in this pool ............ 6. Is ~0~11 to be deviated and is ~llbore plat included ................ . .. 7. Is operator the only affected pst%7 ........................... 8. c~ ~_=~ ~ ,~=~ ~,~o=, ~-~r -~: .. l.. ~... i. ~ ..... ~. ~.. 9. Does operator have a bond in force .................................. ~ , , , _ 10. Is a ccus~ order nee~d ....................... ............... '~ · ~ 11 Is administrative approval-needed ......... % ~,~ 13. Does the well have a unique ~_~.,~- ..... , .. -- M'_~_ ~ c~, ~-~ ~-~ W~II l'~:'i},l.~ 14 Is condnct~ stzi~ provided ".r~ ot...,~ 16. Is enough cement used to cizculal:e cm condo, tot arid ~ce ......... 17. ~ c~: ~e ~ ~ce ~ ~:~d!~te ~ ~~ s~ ... ~ 18. Wi~ ~: ~~ ~ ~~~ ~~~ ..................... ~ 19. W~ ~ ~~ ~ a~te s~e~ ~ ~~se, t~i~ ~d ~t.. 20. ~ ~~ ~ be~~ o~ ~ ~ ~~~~~ ............ ~ ~ ~. ~ old ~ore ~~t ~c~_~ ~~d ~ 10-403 ............ ~ ~. ~ ~te ~~ s~a~ ~sed ............................ 26. Does ~ ~ ~ ~,~~ - Test ~o ~ psi~ .. ~ 27. Does the clmke -~/:old emily w/API RP-53 (May 84) .................. 2~. ~ t~ p~.~.~ o~ ~s. s~ ~~ ....................... . ......... i i For emploratar~ and Stra~ wells: 29. Are darm ~ted om potential ~sure zcm~s? ................. 30. Are seismic ~-lysis data present, ed. cm sl3allo~ l~s ~ .... , ....... 31. If an o~ loc., are suzvey resul~ of seabed canditicms present, ed Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX~ No special'effort has been made to chronologically" · organize this category of information. RECEIVED FEB 2. 2 1995 Alaska Oil & Gas Cons. ~mm~ssion Anchorage AbASKA COMPUTING CENTER' MICI OI:ILNED COMPANY NAME rZZbO NAME BOROUGH AP! NUMBER REFERENCE NO ARCO AbASKA !NC. D-S. IB-tl PRUDHO~ BAY NORTH SbOP£ AbABKA 50'029-21181-00 95067 ,IS Ta~e Verification Listing ;ehlumberger AlasKa Computing Center · 21-MAR-1995 10:11 **** REEL HEADER SERVICE NAME : EDIT D.TEA : 95/03/21 ORIGIN : FLIC REEL NAME : 95067 CONTINUATION # PREVIOUS REEL COMMENT : ARCO ALASKA INC., DS 18-11, PRUDHOE BAY **** TAPE HEADER SERVICE NAME :EDIT DATE :95/03/21 ORIGIN : FbIC TAPE NAME . # : 95067 CONTINUATION : 1 PREVIOUS TAPE COMMENT : ARCO ALASKA INC, DS ~8-1~, PRUDHOE BAY ,50-029-21181-00 TAPF HEADER PRUDHOE BAY CASED HOLE WlRELINE 50GS ~EbL NAME: A~I NUMBER: O~E~ATOR: L GGING COMPA TAP~ CREATIoNN~iTE, jOB NUMBER, ~OGGING ENGINEER, OPE.ATOR WITNESS, SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FEL: ELEVATION(FT FROM ~SL O) KELLY BUSHING: DERRICK FLOOR~ GROUND LEVEL: ~ELL CASING RECORD 1STSTRING 2ND STRING ]RD STRING PRODUCTION STRING DS: 18-1i 5~0~9~.118100 ARCO A ASKA ~1"MAR'95 95067 SCHWARTZ ~, BOLKOVATZ 19 11N 15E t278 431 48',00 47,00 14,00 OPEN HOLE CASING DRILLERS CASING BlT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) mmmmmmm~m~mmm mmm~mmm mmmm~mmmm~ ~mm~mmmmmm~ 9,$25 11062,0 47,00 , 000 I1927,0 29,00 . oo ~,$00 10~05,0 $0 # CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) Tape Verification Listing ~cblumoerger Alas~:a Computing Center BASELINE CURVE FOR SHIFTS bDWG TOOL CODE) LDWG CURVE CODE) RUN NUMBER) PASS NUMBER) DATE LOGGED~ LOGGING COMPANY BAEEb 11773 11762 11749 ! 1~?~0 11727 1 72O 11709 11697 11676 ~1660 11627 11605 11604 ! II 597 582 1 52~ 1149 1147~ 1146 1146 1144~ 11440 100 INE DEPTH 0 0 0 0 0 0 5 0 5 5 0 5 0 0 0 0 0 0 0 ECS GR 12-SEP-87 GRCH TDTP 11760,5 11748,0 11727,0 11726,5 ll?lS,O 11696,5 I1676.5 11660,5 I1627 11604,0 I1 604,0 1596,0 11581,0 11581,0 11521,0 11521'5 t1491,5 ! 47 II 1462 11441,0 90,0 9 o0 REMARKS: 21-MAR-1995 10:11 UNEHIFTED DEPTH.---------- THE INFORMATION PERTAINING TO THE OPEN HOLE GR SUCH AS RUN NUMBER. PASS NUMBER. LOGGING DATE'AND LOGGING COMPANY WAS NOT PROVIDED WITH THE TAPE SUPPLIED BY THE CLIENT, THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT CASED HOLE GR TO OPEN HOLE GR AND CASED HOLE SIGM TO OPEN HOLE GR ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGN SH~FTS $ $ PAGEt lis Tape VerifiCation Listing ,chlumberqer Alaska Computing Center **** FILE HEADER ***~ FILE NAME = EDIT ,001 SERVICE : FLIC VERSION = OOtC01 DATE = 95/03/21 ~AX REC SIZE = 1024 FILE TYPE = LO LAST FXLE : 21-.~AR-1995 10=i1 PAGE= FILE HEADER ILE NUMBER= 1 DITED'CURVES DepthShlfted and clipped curves for each pass ~n separate files, DEPTH INCREMENT: 0,5000 ~ILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11796,0 1~395,0 TDTP 1i809,0 !: 395,0 $ ~URVE SHIFT DATA ' PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE= PAS8 NUMBER= ----------EQUIVALENT UNSHIFTED DEPTH-'-----'.--- BASELINE DEPTH REMARKS{ THIS FILE CONTAINS PASS }! OF THE TDTP, NO PASS TO PASS SHIFTS NERE APPLIED TO THIS DATA, $ FORMAT DATA DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE ! 66 0 2 66 0 3 73 92 4 66 I ~chlum erqer Alaska Computln~ Center 21-~AR-1995 10:11 PAGE= 4 TYPE REPR CODE ,VALUE 5 66 6 73 7 65 1! 66 12 68 13 66 0 14 65 15 66 68 16 66 0 66 0 $* SET TYPE NAME SERV UNIT SERV ID ORDE 5010 0 5010 50t0 5010 5010 5010 CU501 CPS501 0 CPS 5010 CPS 5010 CPS 5§10 CPS 5 10 CPS 50t0 CPS 5010 CPS 5010 GAP! 5010 LB 5010 V 5010 GAPI 5010 DEPT $IGM TDTP TPH! TDTP SBHF TDTP SBHN TDTP $IGC TDTP SIBH TDTP TART TDTP SDS! TDTP BACK TDTP FBAC TDTP TCAN TDTP TCAF TDTP TCND TDTP TCFD TDTP TSCN TDTP TSCF TDTP XNND TDTP INFD TDTP GRCM-TDTP TFNS TDTP CCL TDTP GR ECS FT ~u s CU 12 12 12 12 12 01.2 0 12 i2 12 12 12 12 - CHAN ** ICE APl AP! AP! AP1 FILE NUMB NUMB SIZE REPR PROCESS R # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) mmm~mmmmmmmmmmmm~mmmmtm~mmmmmmmmmmM~mmmmmmm~~,~mmmt~~'~ ooooo oo o, , , ~ ~.oooooooooo oo ooo ooo , ~ ~ , ~0 oooooooooo oo ooo ooo ~ , , i o, oooooooooo O0 000 O00 1 I I 4 68 0000000000 oo ooo ooo ~ ~ , 4~ ~ oooooooooo O0 000 O0 0 I ! 1 4 68 0000000000 D~PT SBH~:TDTP SDSI,TDTP TCAF.TDTP TSCF.TDTP 11809.000 43.557 0.908 9046,004 694.139 SIGM.TDTP SIGC'TDTP BACK,TDTP TCND,TDTP INND,TDTP 5~,422 19074,875 1799,870 TPNI~,TDTP S l BH., TDTP FBAC.TDTP TCFD'TDTP INFD,TDTP 61,21t 45.000 14,826 4627,084 420,395 BHF.TDTP RAT,TDTP TCAN,TDTP TSCN,TDTP GRCH.TDTP 39~,961 2,080 35199,438 ~2617,600 -999,.250 · Tape VerifiCation Listing ,chlumberqer AlasKa Computing Center TE~S,TDTP DEPT, SBHN,TDTP .$D$~,TDTP T~AF,TDTP TSCF,TDTP TENS,TDTP 1365'000 I~96 ,250 99;250 99.250 99;250 CC5,TDTP SIGM,TDTP SIGC~TDTP BACK,TDTP TCND,TDTP INND. TDTP CCb. TDTP END OF DATA ** 2.! -!VIAR-199'3 10: :{ 1 0,000 GR.BCS '999'250 TPHI.TDTP '999-250 SIBH.TDTP '999.250 FBAC'.TDTP "999,250 TCFD.TDTP -999°250 INFD,TDTP -999,.250 GR;BCS '999...250 .-999 -999 -999 -999 -999 84 ,250 :$BHF.TDTP · 250 TRAT'TDTP ,250 TCAN;~TDTP .250 T$CN'TDTP ,250 GRCH-TDTP ~-999'250 ::999,~50 999.,~250 ,~999,25'0 999,250 **** FILE TRAILER FILE NAME = EDIT ,001 SERVICE = F~IC VERSION { O01CO1 DATE : 95/03/2t MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER FILE NAME { EDIT ,002 SERVICE VERSION = 001C~2 DATE { 95/0 MAX REC SIZE = FIhE TYPE : bO LAST FILE FILE HEADER. FILE NUMBER{ 2 EDITED CURVES Depth shltted and cl~pped curves foreach pass ~n separate tiles, PASS NUMBER{ 2 0,5000 DEPTH INCREMENT{ # FTLE SUMMARY bDWG TOOL CODE GRCH TDTP $ START DEPTH ,0 STOP DEPTH ~mpiml~mmmmmmm. I1395,0 11395,0 ~URVE SHIFT DATA = PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS ~DWG CURVE CODE{ GRCH PASS NUMBER= ?ape verification bisting =chlumberger Alaska ¢omput[nq Center 21-MAR-I995 10:11 PAG£1 BASELINE DEPTH 88888 0 !:1802 5 11798 5 11794 5 ~I793 5 1.1790 5 ! I786 5 ! t782 5 ! 1781 5 11 . 1177~.5 1176 5 il. 58 5 11754 $ 11750 5 1 5 11697 5 !.1694 5 11693 5 11690 5 ! 686 5 I674 1 5 669 5 1 666 $ 11662 5 11661 5 11658 5 116575 I165i 5 1165 5 1165~ 5 1164 5 i1646 5 11645 5 116425 11641,5 11638,5 t!637,5 11634,5 11633.5 11629 5 11626 5 11625 5 11622 5 11618 5 11617 5 GRCH 88888.5 ----------EOUIVAbEMT U~SHIFTED TDTP 8888q.,0 11799 11794 11794,0 1.179:!,0 11787 I1779,0 11782,0 1177~,5 117'7 ,0 11.767,0 11763,5 11759,:0 1755,5 703,0 I751,0 1 698'5 11698,0 11695,5 11693,5 11691,5 ii686' 11675 11669,5 11667,0 11666,0 11663.0 11662,0 11658,5 11657.5 11655,0 11653,5 i165t,0 11650,0 11647,5 11646.0 11643.0 11641,5 li638,5 11638,0 11635,0 12633,5 11630,0 11627,0 11625.5 1622,5 i1619,0 11617.5 ~¢hlumDerger laska Comput ng Center 11609 11606 11605 11'602 11'601. II59g J1594 11590 11582 11578 1157¢ 11570 11566 11565 11562 11561 11558 11557 ]1554 lI553 ti55~ 1154 11546 11545 1 i{542 541 11938 !I537 ! 5 30 I1526 11522 ! 115~9 tl 11506 1 505 ii 11498 11497 ! 4~0 ii4 4 11486 1147~ 1147 11470 1146~ 1146 11458 11457 11454 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 1 61 60 ,5 12605,5 11602,0 11566,0 11562.5 11558,0 11554,5 11550,0 11545.5 11541,5 11538,0 t1522.0 11518,5 11510,5 11506,0 11502,5 11498,0 11462,0 11457,5 i1607,0 i1602,5 115990 11595 0 t590 5 1582 5 1579 0 1575 0 1566 0 1570 5 11562,5 I1558,5 11555,0 i1550,5 11547,0 I1542,5 11539,5 I1531"5 527,0 11522,5 11518,5 11'5 0 11507,5 11503,5 11499,0 1494 5 ~t490'5 48 '0 47 11458,5 11455,0 21'MAR'1995 10:I1 ~IS Ta~e VerifiCation ~istin~ A. las~a Com in~ Center ,chlumberqer ' Put 21-MAR-1995 10:11 11453 11450 11449 11446 I 44 4~ 11438 1.1425 114I~ 10 $ 5 1145],0 5 11451,5 5 11450,0 5 11446,5 5 11445,5 5 11442 5 5 11439:0 5 11425,5 5 11418,0 0 100,5 100.5 REMARKS:: THIS'FILE CONTAINS PASS ~2: OF THE TDTP.~ THE DEPTH CORRECTIONS SHOWN ABOVE-EFLECT PAS5 #2 GRCH TO PASS GRCH AND PASS ~2 SIGH TO PASS #! SIGH. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGH SHIFTS,. $ LIS FORMAT DATA #1 DATA FORMAT SPECIFICATION RECORD ** SET.TYPE - 64EB ** TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 9 65 11 66 I1 12 68 1] 66 0 14 65 FT 15 66 68 16 66 1 0 66 I ** SET TYPE - CHAN ~mm~m~mm~m~m~mmm~m~mm~m~mmmm~mmmmm~m~m~mmmm~mNmmmmm~mm~mm~mm~mm~m~~Mm NAME SERV UNIT SERVICE API APl APl APl FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TTPE CLASS MOD NUMB SAMP ELEM CODE (HEX) mmmmmmmmmmmmmmmmmmmmmm~mmmmmmmmmmmmmmmmmm~mmmmmmmmmmmmmmmm~mmmmmmmmmmm~m~mmm~m~~m DEPT FT 501012 O0 000 O0 0 2 t 1 4 68 0000000000 SIGH TDTP CU 501012 O0 000 O0 0 2 I I 4 68 0000000000 TPH! TDTP PU-$ 501012 O0 000 O0 0 2 I I 4 68 0000000000 lis Tape verification Listing ,chlUmberGer AlasKa Computing Center ... 2!-MAR-1995 10511 PAGEI BERV UNiT BERVIC ID. ORDER SBHF TDTP CU 501012 SBHN TDTP CU 501012 $IGC TDTP CU 501012 SIBH TDTP CU 501012 TEAT TDTP 501012 SDS! TDTP CU 501012 BACK TDTP CPS 501012 FBAC TDTP CPS 501012 TCAN TDTP CPS 501012 TCAF TDTP CPS 501012 '~TCND TDTP CPS 501012 TCFD TDTP CPS 501012 TSCN TDTP CPS 501012 TSCF TDTP CPS 501012 INND TDTP CPS 501012 INFD TDTP CPS 501012 GECH TDTP GAP! 5010i2 TENS TDTP LB 501012 CCL TDTP V 501012 AP1 APl AP1 APl FILE NUMB NUMB SIZE REPR PROCESS LOG TYPE'CLASS MOD NUMB. SAMP ELEM CODE (HEX) 00 000 O0 0 .2 00 000 00 0 2 O0 000 O0 0 2 O0 000 O0 0 O0 000 00 0 2 00 000 00 0 2 00 000 00 0 2 00 000 00 0 2 00 000 00 0 2 00 000 00 0 2 00 000 00 0 2 00 000 00 0 2 O0 000 O0 0 O0 000 O0 0 2 O0 000 O0 0 2 00 000 O0 0 2 O0 000 O0 0 2 00 000 00 0 2 .00 000 00. 0 2 1 I 4 68 0000000000 I ! 4 68 0000000000 1 1. 4 68 0000000000 1 4 68 0000000000 ~ ! 4 68 0000000000 I i 4 68 0000000000 ! 1 4 68 0000000000 I 1 4 68 0000000000 I I 4 68 00.00000000 1 1 4 68 O000000000 I I 4 68 0000000000 1 I 4 68 0000000000 1 1 4 68 0000000000 I 1 4 68 0000000000 I I 4 68 0000000000 I i 4 68 0000000000 I I 4 68 0000000000 1 t 4 68 0000000000 I I 4 68~ 0000000000 $* DATA ** DEPT 11809,000 SD$~,TDTP 0, TCA ,TDTP 11038.410 TSCF,TDTP 752,683 TENS.TDTP 1275.000 DEPT, 11395.000 SBHN,TDTP 38.212 SDSI,TDTP 0,231 TCAF,TDTP 40345,070 TSCF TDTP 5371,769 TENS:TDTP 1210,000 SIGM'TDTP SIGC, TDTP BACK,TDTP TCND-TDTP INND'TDTP CCL~,TOTP SIGM,TDTP SIGC.TDTP ~ACK,TDTP TCND-TDTP INND,TDTP CCL.TDTP 36,257 0,331 144,g83 9179.789 5~0 000 11.090 ~'428 ,836 8,281 1877,120 0,000 TPHI~..TDTP '$IBH, TDTP FBAC,TDTP TCFDi. TDTP 'INFD,TDTP TPHI,TDTP SIBH'TDTP FBAC,TDTP TCFD,TDTP 'INFD,TDTP 57,O12 41,06 36:,6~ 4776'629 418,:144 .212 ,331 SBHF*TDTP TRA. T,TDTP TCAN'TDTP TSC'N.TDTP GRCH.TDTP SBHF-TDTP TRAT,TDTP TCAN.TDTP TSCNoTDTP GRCH,TDTP 40~230 2,045 41332'859 :~763-213 999',250 30'664 t'662 84392,453 11236,482 ,26,047 END OF DATA ,IS Ta~e Verl:ication Llstin.~ Jchlomber~er Alaska Computing Center VERSION { O01CO1 DATK { g5/03/21 MAX AEC SIZE { 1024 FILE TYPE { LO LAST FILE ~ 21-MAR-!995 10{!! PAGE{ FILE NAME ~ EDIT ,003 SERVICE { FLIC VERSION { O01CO1 DATE { 95/03/21 MAX REC SIZE ~ 1024 FILE TYPE { LO LAST FILE { FIbE HEADER FILE NUMBER{ 3 EDITED CURVES Oepthshifted and c~i. Pped curves-fog each pass in separateflles, PASS NUMBERI O,$O00 DEPTH INCREMENT: # FILE SUMMARY LDWG TOOL CODE GRCH TDTP START DEPTH STOP DEPTH #D CRVE SHIFT DATA - PASS TO PASS(MEASURED DEPlH) BASELINE CURVE FOR SHIRTS bDNG CURVE CODEI GRCH PASS NUMBER{ 1 BASELINE DEPTH j~799 95 1179 1179~ 11783 11779 11771 11767 11763 11762 .5 5 5 5 5 5 5 5 5 ----------EQUIVALENT UNSHIFTED DEPTH---------- GRCH TDTP 88889,0 8~$89,0 I 800,5 11796,0 11795,5 11763,5 I1792.5 1754'5 11780,0 11772.0 11768,5 11764,0 ~chl3mber~er Alaska Comput 21~MAR-1995 10:11 1175 ! 75~ 11755 11754 11750 .11747 11746 11743 11739 11735 11.727 1 723 11719 11711 11707 11706 11~03 1~499 11699 11694 t 1~ 691 690 I 687 11674 !,1655 65t: 11647 11646 11643 11642 116 11619 11618 1 11610 11590 11587 1 57~ 11570 1 I1567 566 11563 11559 11558 I 5'5~ 1~55 5 5 11759,0 5 5 11750 5 5 11747,0 5 5 5 5 5 5 5 5 5 11707.0 5 5 11702,5 5 5 11698,0 5 11694,0 5 5 11690,5 5 5 11678,5 5 11675,0 5 5 5 5 11647.0 5 1163 5 11619,0 5 5 1161~:0 5 1161 0 5 5 5 11591.0 5 5 11586,5 5 5 5 11570,5 5 5 11566,0 5 5 5 11559.0 5 5 11761,0 11756,0 11748,0 117744 5 11 39 5 5 .1 f 5 11720 0 119912 0 11 090 11705,0 11 oo. 11692,5 11688,0 ! ,5 11644,0 20,5 t1616,0 11596,0 11591,5 11588,5 1158~,0 1157 ,0 11567,5 11563,5 11560,0 11556.5 11551.5 ;PAGE: lis TaPe Verification Listing ;ch!umberoer Alaska Computing Center 21-MAR-1995 10:11 11550,5 11547 54 11542 t t 5 4 5 '.I o, 115 15 114 ~ 5 11494 5 11490 5 11486 5 11462 5 11459 5 ~ 1458 5 11455 5 11454 5 1144 1144] 5 114 5 114 ~ 5 I~4 5 1!42!,5 1142~,5 li41 ,5 i14~5.5 11411.5 100.0 I1551,0 11548,0 !1544.0 II539,5 11535,0 11530,5 11522,5 151 ,5 11511,0 11495.0 11490,5 11487.0 11463.0 11458.5 1145,5,0 11427.0 1142].5 11420.0 101.5 11548,0 11543,5 11540,0 11536.5 11532,5 115 115~':0 11520,0 11508,0 11504-5 I1500.0 1t460.0 11455,5 145~,.0 1144~,5 11423,5 4 5.5 1141.2,0 11100,5 REMARKS{ THIS FILE CONTAINS PASS #3 OF THE TDTP THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT PASS #~' GRCH TO PASS GRCH AND PASS #3 SIGH TO PASS #1 SIGH. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGH SHIFTS,- $ 5IS FORMAT DATA #1 PAGE.{ ,t2 Tape Verification bisttng ,chlumberger Alask:a Computing Center 21-MAR-1995 I0:11 PAGEI DATA FORMAT'SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPRCODE VAbUE 1 66 0 2 66 0 3 73 88 4 66 5 66 6 73 7 65 g 65 11 66 12 68 1) 66 0 14 65 15 66 68 16 66 0 66 ** SET TYPE - CHAN ** NAME BERV UNIT SERVICE AP! API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CbA$S MOD NUMB SAMP EbEM CODE. (HEX) DEPT SIGM TDTP TPH! TDTP SBHF TDTP SBHN TDTP $IBH TDTP TRAT TDTP SDS! TDTP BACK TDTP FBAC TDTP TCAN TDTP TCAF TDTP TCND TDTP TCFD TDTP T$CN TDTP TSCF TDTP INND TDTP INFO TDTP GRCM TDTP TENS TDTP CCL TDTP FT 501012 O0 CU 501012 O0 PU-$ 501012 O0 CU 50101~ 00 CU 50101 00 CU 501012 00 CU 501012 00 501012 00 CU 501012 00 CPS 501012 00 CPS 501012 O0 CPS 501012 00 CPS 501012 O0 CPS 501012 00 CPS 501012 00 ,o, I oo CPS 501 O0 CPS 501012 00 CPS 501012 O0 GAP! 501012 00 bB 50!012 00 V 50]012 00 000 O0 0 3 :1 I 4 68 0000000000 000 O0 0 3 I 1 4 68 0000000000 000 00 0 3 I I 4 68 0000000000 000 00 0 3 I I 4 68 0000000000 000 00 0 3 ! I 4 68 0000000000 000 00 0 3 ! 1 4 68 0000000000 000 00 0 ] I 1 4 68 0000000000 000 00 0 ) I ! 4 68 0000000000 000 O0 0 3 i 1 4 60 0000000000 000 00 0 3 ! 1 4 68 0000000000 000 00 0 3 1 1 4 68 0000000000 000 00 0 3 I 1 4 68 0000000000 000 00 0 3 1 1 4 68 0000000000 000 O0 0 3 I i 4 68 0000000000 000 00 0 3 ! ! 4 68 0000000000 000 00 0 3 1 I 4 68 0000000000 000 00 0 3 1 ! 4 68 0000000000 000 00 0 3 ! 1 4 68 0000000000 000 00 0 3 I I 4 68 0000000000 000 O0 0 3 ! 1 4 68 0000000000 000 00 0 3 ! ! 4 68 0000000000 000 O0 0 3 I 1 4 68 0000000000 Tape Yeri~AiCatlon bSsti )Chlumbercjer aside ¢ompUt ~j Center 21-MAR-1995 ** DATA ** DEPT,T SBHN,:,DTP SDSI,TDTP TCAF,TDTP T$CF.TDTP TENS'TDTP 11809.000 40 603 0 912 9981 73O 723 127 1280 000 $iGM:'TDTP SIGC,TDTP BACK'TDTP TCND.,TDTP INND,TDTP CCb,TDTP 144 FBAC.TDTP 8506.418 TCFD,TDTP 1953.454 INFD,TDTP 0,000 ** END OF DATA ** 55 '37~ SBHF.TDTP 4i 60 TRAT..TDTP 42~ TCAN.TDTP 89 T$CN. TDTP .35~,560 2,008 3!!! 3'977 40,526 99 ~'250 14 **** FILM TRAILER **** FILE NAME : EDIT ,003 SERVICE : rbIC VERSION : 001C01 DATE : 95/03/2t MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE = **** FILE HEADER **** FILE NAME : EDIT ,OO4 SERVICE : FbiC VERSION : 00IC01 DATE : 95/03/21 MAX EEC SIZE : i024 FILE TYPE : bO FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average oZ edited pa$~es for al% curves Pulsed Neutron= Unaverpqed edited Pass ~ Gamma Ray an. backround counts~ arithmetic average of edited static baseline passes for all Other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS TDTP 1, 2, 3, REMARKS: THE ARITHMETIC AVERAGE OF THE THREE PASSES WAS COMPUTED AFTER ALL DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA Tape Verification Listing ichlumberGer AlasKa Computing Center 21-MAR-1995 10:1! DATA FORMAT SPECIFICATION RECORD ** ** sET TYPE - 64EB ** TYPE REPR CODE YAbUE 1 66 0 2 66 0 3 73 BO 4 66 1 9 65 11, 66 12 12 68 13 66 0 ~14 65 15 66 68 16 66 0 66 1 ** SET TYPE -.CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS 'ID DRDER #. bOG TYPE CbASS MOD NUMB 8AMP EbEN ,CODE '(HEX) DEPT FT 501012 O0 000 O0 0 4 I i 4 68 0000000000 SIGN PNAV CU 501:012 00 000 O0 0 4 :l I 4 68 TPH! PNAV PU-S $01012 00 000 00 0 4 I I 4 68 SBHF PNAV CU 501012 00 000 O0 0 4 1 1 4 68 SBHN PNAV CU 501012 00 000 O0 0 4 I I 4 68 SIGC PNAV CU 901012 00 000 00 0 4 1 I 4 68 8IBH PNAV CU 501012 00 000 00 0 4 I I 4 68 TRRT PNAV 501012 00 000 00 0 4 1 1 4 68 808I PNAV CU 501012 O0 000 00 0 4 1 1 4 68 BACK TDTP CPS 501012 00 000 O0 0 4 1 1 4 68 FBAC TDTP CPS 50i012 00 000 00 0 4 1 1 4 68 TCAN PNAV CPS 901012 00 000 00 0 4 I 1 4 68 TCAF PNAV CPS 501012 00 000 O0 0 4 i 1 4 68 TCND PNAV CPS 501012 O0 000 00 0 4 I I 4 68 TCFD PNAV CPS 501012 00 000 00 0 4 ! I 4 68 TSCN PNAV CPS 501012 00 000 00 0 4 1 I 4 68 TSCF PNAV CPS 501012 O0 000 00 0 4 1 I 4 68 INND PNAV CPS 501012 00 000 00 0 4 I 1 4 68 INFD PNAV CPS 501012 O0 000 00 0 4 1 i 4 68 GRCH TDTP GAPI 501012 O0 000 00 0 4 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ~mmmmmmmmmmmmmmmmmmmmm~mmmmm~mmm~mmmmmm~mm~mm#~mmmmmm#mmmmmmmmmmmm~mm~mmmmm~mmm~#~m~m lis ?a.~e Veri'tAicatlon Listen ~¢hl~m'erger la~lca ¢omp~t~n~ Cente~ ,'* DATR DEPT 11809* 37 TSCF,PNAV 723,244 SIGH' PNAV SIGC, PNAV BACK,TDTP TC'ND:~PNAV INND~PNAV END OF DATA 21-MAR-1995 10:!1 4 53,422 189~$,469 2.762 TPHt,DN'AV SlBH, PNAV FBAC~TDTP TCFD., PNAV INFD,PNAV 57.860 42 4684 SBHF..PNAV TRAT.PNAV TCAN,PNAV TSCNjPNAV G. RCH.TDTP PAGE.". 16 38,580 ~2,044 8.44- 977 ~673'5i3 999,250 FILE NAME : EDIT .004 SERVICE DATE MAX AEC SIZE s 1024 FILETYPE LRST F~LE *,1. FiLE HEADER- **** FILE NAME : EDIT ,005 SERVICE ! FLIC V~RSION OOICOI D TE . 95/03/21 MAX REC SIZE ~ 1024 FILE TYPE s LO FILE HE,DER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate PASS NUMBERS l DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH tm~immmNm~mm~m~ mm~mmNmm~t ~i~m~ TDTP 11835.5 11386.5 $ lOG HEADER DATA DATE LOGGED: SOFTWARE VERSIONS TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT)I TOP LOG IN FT) TERVAL ( : tiles! raw bac~qround pass :tn last 18'FEB'95 6 18-FEB-95 11871,0 0 iI$ Tape Verification Listing ,chlumberger Alaska Computing Center BOTTOM LOG INTERVAL LOGGING SPEED (FPHR)~ DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TD~P TDTP TDTP TDTP TDTP TDTP TDTP TDTP $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)I DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) SURFACE TEMPERATURE ~DEG BOTTOM HOLE TEMPERATURE ( EGF)I FLUID SALINITY (PPM){~ FLUID LEVEL FLUID RATE AT WELLHEAD WATER CUTS GAS/OIL RATIO{ CHOKE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX{ MATRIX DENSITY{ HOLE CORRECTION 11810.0 2400,0 NO TOoL NUMBER # # REMARKS: COLLAR bOCATOR CALU B AUXILLIARY MEASUREMENTS ATC CBl108 TDTP CARTRIDGE TNC P 50 TDTP DETECTOR TND P 78 TDTP GENERATOR TNG P 21 AUXILLIARY MODULE ATM AA 360 1 ! 062.0 DEAD CRUDE .35.0 210 ,'0 THERMAL SANDSTONE 2,65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT)~ BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS){ FAR COUNT RATE HIGH SCALE NEAR COUNT RATE LOW SCALE NEAR COUNT RATE HIGH SCALE (CPS). TOOL STANDOFF (IN){ TIED INTO BHCS DATED 12-~EP-1987. hOGGED TDT-P OVER THE INTERVAL_lIS10-11400' WHILE PUMgING DEAD CRUDE AT .5 BPM (800 PSI)., STARTED MAKING PASSES AFTER 230 BBLS WERE PUMPED. PUMPED TOTAL OF 277 BBL DEAD CRUDE (190 PAGE'~ i7 Tape Verliication Listlncj ;cl~lumberger Alasl~a ComputinO Center 21-~AR-1995 10~11 DID NOT TAG TD.. GAS SEEN DOWN TO I1550~,,:.,' GOC ???? $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD SET TYPE - 64ES **. TYPE REPR CODE VALUE 1 66 0 2 66 0 5 66 6 73 7 65 9 65 ~2 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 mmmmm~mmmmmmmmmmm~mmm~m~m~! NAME SERV UNIT SERVICE API APl APl API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 501012 O0 000 00 0 5 1 1 4 68 0000000000 s..~ ,s, coso,o,= oo ooo oo o s , s... ,st cuso,ot~ oo ooo oo o s , ~,~c ,~, co,o,o,~ oo ooo oo o , , ,.A, .~,~o,0~ oo oo0 oo o ~ ~ s~, ~,cuso,o,~ oo ooo oo o , , ~c~ ,s, c~s so,o,~ oo ooo oo o s , ~.~c ~s, c~s so,o,~ oo ooo oo o s ~ ,¢~ ~s, c~s so~o,~ oo ooo oo o s ~ ,c~ ,st c,s so,o,~ oo ooo oo o s , ,c.~ ,s, c,s so,o,~ oo ooo oo o s , ,c~ ,s, c.s so,o,~ oo ooo oo o s , ,sc. ,st c,s so,o,~ oo ooo oo o s , ,scr .st c.s so,o,~ oo ooo oo o s , 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 o0000o0000 000o000000 0000000000 lis Tal~e Verification Llstlno c~lum'er~er Alisa8 Co,put ~,0 ~enter 2~-~AR-1995 10:I1 PAGI~~ NAME SERV UNIT SERVICE AP1 AP1 AP1 API FILE NUmB NUMB SiZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INND PS1 CPS 501012 O0 O00 O0 O 5 '1 I 4 68 0000O00000 INFD PSi CPS 501012 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PSi LB 501012 00 OO0 00 0 5 I 1 4 68 0000000000 GR PS1 GAPI' 501~01~ O0 000 O0 O 5 i 1 4 68 0000000000 CCL PSi V ~01012 O0 000 O0 0 5 I I 4 68 0000000000 ¸19 DEPT 1!~}~.~00 SIGN,PS! 42.630 TPHI'PSi 0:~0 SBHF.'PSl TRAT.PS! TCAF,P$1 0,000 TCND~PSI -758'2 7 TCFD,P$i -1 TSCF,PS! 000 iNND;P'S! -2,~58 INFD,PS! -0'39 TENS,PS1 o.ooo SBHN.Ps1 36.833 8IGC-P$! 8:3) TRAT.P$1 TCAN,P$t TCAF*P6I 34407'609 TCND,P61 TCFD~P~I 11030~2~4 TSCN,P$1 TSCF;P.S! 4805.552 INND~PS1 1897.824 'INFD&PSi 496,388 TENS,PS1 GA.PS1 13.680 CCL~.P.$1 0.000 END OF DATA ,0,000 .0'000 0,000 i330..~000 29,694 73807;328 !0308'328 12'50.000 FiLE NAME ~ EDIT ,005 SERVICE I FLIC VERSION I 001C01 DATE ~ 95/03/21 MiX REC SIZE ~ 1024 FiLE TYPE ) LO LAST riLE ~ **** FiLE FILE NAME S~RVlCE VERSION DRTE MAX REC $~ZE FiLE TYPE bAST riLE HEADER **~ : EDIT ,006 :FLIC : 001C01 : ~5/0]/21 : 10~4 Tape Verification Listing ;chlumberger AlasKa Computing Center 21-MAR-1995 10:11 · PAGEr 2O FILE HEADER FILE NUMBER 6 RAW CURVES Curves and loq header data for each Pass in separate PASS NUMBERI 2 DEPTH INCREMENTS 0,5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11819,5 $ ~OG HEADER DATA DATE bOGGED= SOFTWARE VERSlON~ TIME LOGGER ON TD DRZLLER TD LOGGER(FT)~ BOTTOM LOG XNTERV ' LOGGING. SPEED DEPTH CONTROL U3ED (YES/NO)~ STOP DEPTH 11392,0 TDTP TDTP TDTP TDTP TDTP TDTP TDTP TDTP COLLAR LOCATOR AUXILblARY MEASUREMENTS TDTP CARTRIDGE TDTP DETECTOR TDTP GENERATOR AUXILLIARY ~ODULE BOREHOLE AND CASING DATA OPEN HOLE BlT SIZE (IN)) DRILLERS CASING DEPTH (FT)) LOGGERS CASING DEPTH (FT)~ ~OREHOLE CONDITIONS FLUID TYPE~ FLUID DENSITY SURFACE TEMPERATURE (DEGF)~ BOTTOM HOLE TEMPERATURE (DEGF)~ FLUID SALINITY (PPM)) FLUID LEVEL (FT)~ FLUID RATE AT WELLHEAD WATER CUTS GASYOI~ RATIOI CHOKE NEUTRON TOOL TOOL TYPE (EPITHERMAb O~ TH~RMAL)I !8-FEB-95 42-2 ~506 11871,0 11395'0 11810.0 '2400,0 NO fllesi raw bacKqround pass .in 2ast f~ 18-FEB=95 TOOh NUMBER CALU B ATC CB1108 TNC P 50 TND P 78 .!1062.0 DEAD CRUDE 0 THERMAL Tape Verification Listing ;chlumberger Alaska Computing Center 21-MAR-1995 i0~11 MATRIX~ SANDSTONE MATRIX DENSITYI 2.65 HOb~ CORRECTION BbUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (.FT)~ BASE NORMALIZING WINDOW (FT)~ BbUEbINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE bOW SCALE (CPS){ FAR COUNT RATE HIGH SCALE NEAR COUNT RATE bOW SCALE NEAR COUNT RATE HIGH SCALE (C # TOOL STANDOFF REMARKSt TIED iNTO BHC$ DATED [2-SEP-i987.! . PASSES AFTER 230 BB~$ WErE PUMPED. · PUMPED TOTAL OF 2?? BBb DEAD C,'UDE (190R DEG,), DID NOT TAG ~D GAS SEZN DOW. ~0 11550~,',, ~0¢ ??!~~ $ LIS FORMAT DATA ',21 DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB TYPE REPR CODE VALUE ! 66 0 I o 4 66 i 5 66 6 ? 65 1½ 66 11 1 68 13 66 0 14 65 15 66 68 16 66 0 66 I ,IS Tape Verlticatton blst!ng ichlumberger Alaska Computi'nq Center 21-MAR-t995 10111 P AGE = ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API AP! APl API FIbE NUMB NUMB 81ZE REPR PROCESS ID ORDER # bOG TYPE CbA$S MOD NUMB SAMP EbEM CODE (HEX) 4 68 0000000000 DEPT FT 501012 O0 000 O0 $IG" ~ ~ O0 000 O0 PS CU 50t01 TPH! ~$ PU 50101 00 000 00 SBHF P$2 CU 501012 O0 000 O0 SBHN P$2 ~ 00 000 00 $!BH PS2 CU 501012 O0 000 O0 TRAT P62 501012 00 000 00 SOS! P$2 CU 501012 O0 000 O0 BACK P$2 CPS 50101.2 O0 000 00 FBAC P62 CPS 501012 O0 000 O0 TCAN P$2 CPS 501012 00 000 00 TCAF P52 CPS 501012 O0 000 O0 TCND P$2 CPS 501012 00 000 00 TCFD P82 CPS 501012 O0 000 O0 TSCN P$2 CPS 50101.2 00 000 O0 TSCF PS2 CPS 501012 O0 000 O0 ~NND P$2 CPS 501012 00 000 O0 iNFO P$2 CPs 501012 O0 000 00 TENS P$2 LB 501012 00 000 O0 G~ PS2 GAP! 501012 O0 000 O0 CCL P$2 V 501012 00 000 00 0 i 4 68 00000.00000 0 6 ! 0 6 I 1 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 ! 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 I ! 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 1 i 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 1 1 4 68 0000000000 O 6 1 I 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 I I .4 68 0000000000 0 6 I i 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 I I 4 68 0000000000 ~22 ** DATA ** D~PT 11819,500 SDS!.PS2 0'292 ,TCAF.PS2 34407,609 TSCF,PS2 4805'552 GR.P$2 77.250 D~PT, 11392'000 SBHN,PS2 37.339 SDS!,P$2 0'264 TCAF,PS2 33966,023 TSCF.PS2 4519.177 G~*PS2 25'672 BACK~PS2 TCND.P82 !NND,PS2 CCh'PS2 SIGM .PS2 PS 8IGC p8) BACK ?CND P$2 INND~P82 CCh P$2 i "sI 11, '8 TPHI~ ~5 PS 8ZBH.~ 30541.410 ?CFD,P8 189~:814000 INFO,PS2 12,?00 TPHI~PS2 15~.790 S!BH,PS2 .965 rB~C,PS2 2~.~40 ?CrU,Ps2 -050 INFO+PS2 0.000 659 11030,254 496,388 20,485 37-339 30'697 I0774,129 491,813 :$BHF,P$! TRAT-,PS TCAN.P~ TSCN.P$2 TENS.PS2 SBHF P,S2 TRAT PS2 TCAN PS2 TSCN P$2 TENS ,PS2 0308,328 .I035,000 32'688 ~,688 74441,453 9905,094 1200.000 END OF DATA ,IS Tape verlflcation Listing ;chlumberger AlasKa Computlnq Center FILE NAME : EDXT ,006 SERVICE ~ FLIC VERSION' DATE ~ 95/03/21 MAX REC SIZE ~ 1024 FILE TYPE LAST FILE F~E NAME ~ EDIT ,007 SERVICE ~ VER$IO~ ~ 001. C01 DATE ~ 95/03/21 ~AX REC SIZE ~ 1024 FIL~ TYPE ~ LO ~AST FI~E 21,,,MAR-1995 10:11 PAGEt F~LE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate 'tiles'/ raw background, pass .in last PASS NUMBER~ 3 DEPTH INCREMENT: 0,5000 ~ILE SUMMARY. VENDOR TOOL CODE START DEPTH TDTP 11820,0 bOG HEADER DATA STOP DEPTH 11354,5 DATE LOGGED{ SOFTWARE VERSION{ TIME LOG~ER ON BOTTOMt TD DRILLER (FT)*~ D LOGGER(FT)t TOoL STRING. (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ~m~m~mm~m~ ~m~~ TDTP TDTP TDTP COLLAR LOCATOR TDTP' TDTP TDTP TDTP 1B-FEB-95 2.2 5O6 11871..0 0,0 11395'0 11810,0 2400,0 NO IL=FEB-95 TOOb NUMBER IIIIIIIIIII CAbU 8 AUXIbLIARY MEASUREMENTS ATC CBl108 TDTP CARTRIDGE TNC P 50 TDTP DETECTOR TND P 78 TDTP GENERATOR TNG P 21 Tape Verification Listing ichlumberger Alaska Comput ng Center 21-MAR-1995 i0:1! # REMARKS{ TDTP AUXILbIARY MODULE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE DRILLERS CASING DEPTH LOGGERS CASING DEPTH BOREHOLE CONDITIONS FLUID TYPE: SURFACE TEMPERATURE (DEGF~GF), BOTTOM HOLE TE..PERATURE ( FLUID LEVEL WATER CUTS (PCT)~ OAS/O U CHOKE (DEG){ NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL){ MATRIX: MATRIX, DENSITY{ HOLE CORRECTION ATM AA 360 1i062,0 DEAD CRUDE THERMAL SANDSTONE 2'65 BLUELINE COUNT RATE NORMALIZATION IN 016 ZONE TOP NORMALIZING WINDOW (FT)~ BASE NORMALIZING WINDOW (FT)~ BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) FAR COUNT RATE HIGH SCALE (CPS}: NEAR COUNT RATE LOW SCALE (CPS) NEAR COUNT RATE HIGH SCALE(CPS){ TOOL STANDOFF (IN){ TIED INTO BHCS DATED 50GGED TDT'P OVER THE INTE~VAL~l1810-1~400" WHILE PUMPING DEAD CRUDE AT ,5 BPM (800 PSI)~,. STARTED MAKING PASSES AFTER ~30 BBLS WERE PUMPED. PUMPED TOTAL OF 277 BBL DEAD CRUDE (,190 DEG,), DID NOT TAG GAS SEEN DOWN TO 11550',., GOC ???? $ LTS FORMAT DATA 24 ~I$ Tae Verification Llsti~ng ,¢hlum~erger AlasKa Computing Center 21-MAR-1995 10:1! DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR mmmmmmmmmmm~mmm I 66 2 66 3 '/3 4 66 5 66 6 '/3 ? 65 8 68 9 65 11 66 1:2 68 13 66 14 65 15 66 16 66 0 66 0 0 88 ~o~5 0 68 ! ** SET TYPE - CHAN ** NAME SERV UNI-T SERVICE A.P! APl APl APl. FiLE NUMB NUMB SIZE REPR PROCESS # .CODE (HEX) ID ORDER bOG TYPE CLASS MOD NUMB SAMP EbEM DEPT FT 901012 00 000:00 0 .? :l I 4 6~ 0000000000 $IGM PS3 CU 501012 00 000 O0 0 7 I ~ 4 6 0000000000 ~pH~ PS) eU 5010i~ 00 000 O0 0 7 i ~ 4 68 oooooooooo SBHr PS3 ~ 501012 00 000 O0 0 7 .1 1 4 68 0000000000 se.. ps~ .~ SOlOt~ oo ooo oo o ? 1 ~ 4 68 oooooooooo BlOC P$3 CU 50101~ O0 000 O0 0 7 1 1 4 68 0000000000 $IBH PS3 CU $0101. O0 000 O0 0 ? I 1 4 68 0000000000 ~.~ .s~~o~o~ ooooo ooo ~ ~ ~ ~ ~ oooooooooo ~os, .~~o~o~ ooooo ooo ~ ~ ~ ~ ~e oooooooooo ~c~ .s~s ~o~o~ oo ooo ooo ~ ~ ~ ~ ~. oooooooooo FBAC PSI CPS S01012 O0 000 O0 0 ? i I 4 68 0000000000 ~CA. ~s~ C~S ~o,ol~ oo ooo oo o ~ ~ i ~ ~ oooooooooo ,c~r .s~ c~s so,o,~ oo ooo oo o ~ , ~ ~ ~e oooooooooo · ~CNops~ C~s so~o~ oo ooo oo o ? ~ , ~ 60 oooooooooo ,~ .~,~,~ ~o,o,~ oo ooo oo o ? , , , ~, oooooooooo yc. ,~, c~ ,o,~i~ oo ooo oo o ? , , , ~0 oooooooooo ~c~ ,~, c,~ ,o, oo ooo oo o ? , , 4 6, oooooooooo ,..~ .,, c,~ ~o,o,~ oo ooo oo o , , , , ~, oooooooooo ,.~ ,~, ~.~ ,o,o,~ oo ooo oo o ~ , ~ , ~, oooooooooo ,~.~ .~, ~. ,o,o,~ oo ooo oo o , , ~ , ~, oooooooooo ~, ,~,~,~ ,o,o,~ oo ooo oo o ? , , , ~0 oooooooooo CCh PS3 V 501012 O0 000 O0 0 ? 1 ! 4 68 0000000000 mm~mmmm~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm~mmmmmm~mmwm~mm~mm~Mmmm~mm~m~~mm ¸25 sis Tape Verificat. ion Listing ~chlumberger AlasKa Computing Center DATA DEPT TSCF i1820.000 PS3 37'339 PSt 33966 3 P$3 132 000 DEPT SBHN:P83 SDSY,PS3 TCAF,.P,83 11384.500 37,444 0,~20 SIGM :SIGC BACK P83 TCND PS3 !NND PS3 COb PS3 SIGM,PS3 SIGC;P8 BACK,PSI TCND'PS3 N 'PS3 END Or DATA 21-MAR'I995 10111 12.700 TPHI,PS3 ~4'.790 SIBH'PS3 29 ,965 'FBACVPS3 · 050 'iNFD,PS3 0~000 i1"93247 17~1 542 ~78 ° 2 0 0 TPHt.:, P83 SlBH,PS3 TCFD-P$.~ INFD'P$ 20,485 SBHF..P$3 37'339 TEAT.PS3 30-697 TCAN,PS3 10774,129 TSCN.P83 491.813 TENS'P&3 !,086 SBHF.P63 ,444 TRAT.PS3 ' .123 TCAN.PS3 10578 498:~ TENS.ps3TSCN:'PS3 PAGEl' ,26 32,688 744.46'453' '9905,~094 875,,00:0. 77168'609 FILE NAME i EDIT .007 SERVICE : FLOC VERSION ~ 001C01 DAT~ ~ .95/03/21 MAX AEC $~ZE ~ !024 LAST FiLE ~ **** TAPE TRAILER SERVICE NA'ME { EDIT DATE : 95/03/21 OeICIN : TAPE NAME { 95067 C~NTINUATION # : 1 PREVIOUS TAPE COMMENT ~ ARCO ALASKA IN~, DS 18-~1, PRUDHOE BAY **** REEL TRAILER **** SERVICE NAME : EDIT DATE I 95/03/21 ORIGIN . I FLlC R~EL~NANE : 95067 CONTINUATION # l PREVIOUS REEL ~ COMMENT : ARCO ALASKA INC, DS 18-11~ PRUDHOE BAY ,50-029-21181-00 Tape Subfile 1 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED 9:32:08 HEADER STARTING DEPTH 11651.000 FILE LABEL LEVEL SPACING SAMPLES / RECORD HEADER ENDING DEPTH ~ 1 0.25000 32.0 0.000 at 11651 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0'.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-5.0000 at 11650 Feet CCL = 300.00 SPD =0..00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-I.0000 RIN = 3.0000 RICS=-5.0000 at 11600 Feet CCL =0.00000 SPD = 22.343 LS = 5.1480 SS = 9.4140 G1 = 3.6310 GE1S=189348. G2 = 6.4430 GR = 11.822 MON = 1993.1 BKL = 24.415 BKS = 29.885 CSS = 6.9120 ISS = 16.164 SGMA= 4.6570 MSD = 7.0753 RATO= 1.8258 RBOR=0.79598 RIN =0.00002 RICS=0.61045 at 11550 Feet CCL =0.00000 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR = 28.128 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MS'D =0.00000 RATO=0.00000 RBOR=-i.0000 RiN = 3.0000 RICS=-5o0000 at 11531.25 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GE1S=O.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i'.0000 RIN = 3.0000 RICS=-5.0000 Tape File Start Depth = 11651.000000 Tape File End Depth = 11531.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet MICROFILMED RECEIVED DEC $ 1990 0il & 8as Cons. Commission Anchorage . Tape Subfile 2 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED 9:43:03 HEADER STARTING DEPTH 11652.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 2 O.25000 32.0 0.000 at 11652 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-5.0000 at 11650 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-5.0000 at 11600 Feet ' CCL =0.00000 SPD = 13.999 LS = 2643.8 SS = 44368. G1 = 10775. GE1S=143054. G2 = 2274.1 GR = 39.960 MON = 2032.0 BKL = 96.549 BKS = 209.27 CSS = 27466. ISS =332805. SGMA= 24.678 MSD =0.31943 RATO= 16.769 RBOR= 1.5033 RIN = 6.5496 RICS= 12.913 at 11550 Feet CCL =0.00000 SPD = 13.999 LS = 3998.7 SS = 50847. G1 = 17720. GE1S=131637. G2 = 5731.3 GR = 22.916 MON = 2034.3 BKL = 61.538 BKS = 203.35 CSS = 31608. ISS =331081. SGMA= 17.192 MSD =0.09116 RATO= 12.742 RBOR= 1.3919 RIN = 6.2945 RICS= 10.199 at 11500 Feet CCL =0.00000 SPD = 13.999 LS = 4245.5 SS = 52735. G1 = 18783. G~1S=136439. G2 = 6210.8 GR = 17.337 MON = 2043.1 BKL = 82.183 BK$ = 160.10 CSS = 33015. ISS =333659. SGMA= 16.914 MSD =0.09400 RATO= 12.420 RBOR= 1.4107 RIN = 6.3279 RICS= 10.099 at 11450 Feet CCL =0.00000 SPD = 13.999 LS = 1925.0 SS = 37298. G1 = 5779.8 GE1S=149755. G2 = 555.17 GR = 59.821 MON = 2030.6 BKL = 154.78 BKS = 265.81 CSS = 23952. ISS =338458. SGMA= 35.730 MSD =0.29425 RATO= 19.369 RBOR= 1.5611 RIN = 6.6216 RICS= 13.920 at 11400 Feet CCL =0.00000 SPD = 13.999 LS = 4847.2 SS = 55161. G1 = 20837. GElS=137745. G2 = 7609.0 GR = 15.642 MON = 2033.8 BKL = 55.643 BKS = 194.46 CSS = 34831. ISS =333380. SGMA= 15.499 MSD =0.22068 RATO= 1'1.390 RBOR= 1.4046 RIN = 6.2021 RICS= 9.5087' at 11350 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-3.5000 at 11348.25 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BK$ =0.00000 C$S =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-3.5000 Tape File Start Depth = 11652.000000 Tape File End Depth = 11348.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 3 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKle** DATE LOGGED MAY 13 90 TIME LOGGED 10:08:30 HEADER STARTING DEPTH 11655.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 3 0.25000 32.0 0.000 at 11655 Feet CCL = 300.00 SPD =0.00000 LS = 800,00 SS =0.00000 G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-3.5000 at 11650 Feet CCL = 300,.00 SPD = 13.999 LS = 4004.4 SS = 49509. G1 = 17983. GE1S=125645. G2 = 6211.8 GR =0.00000 MON = 2049.4 BKL = 105.69 BKS = 588.45 CSS = 30925. ISS =317389. SGMA= 16.321 MSD =0.21197 RATO= 12.372 RBOR= 1.4115 RIN = 6.3129 RICS= 10.336 at 11600 Feet CCL =0.00000 SPD = 12.999 LS = 2662.9 SS = 44315. G1 = 10686. GE1S=143968. G2 = 2258.7 GR = 41.167 MON = 2029.1 BKL = 125.66 BKS = 291.08 CSS = 27500. ISS =330182. SGMA= 24.789 MSD =0.42655 RATO= 16.627 RBOR= 1.5151 RIN = 6.6245 RICS= 12,642 at 11550 Feet CCL =0.00000 SPD = 12.999 LS = 3914.0 SS = 50615. G1 = 17678. GE1S=130798. G2 = 5668.9 GR = 27.624 MON = 2029.2 BKL = 80.737 BKS = 210.94 CSS = 31453., ISS =327814. SGMA= 17.523 MSD =0.14771 RATO= 12.937 RBOR= 1.4147 RIN = 6.3115 RICS= 10,082 at 11500 Feet CCL =0.00000 SPD = 13.999 LS = 4197.2 SS = 52695. G1 = 18377. GE1S=135116. G2 = 6143.1 GR = 19.766 MON = 2028.1 BKL = 81.605 BKS = 211.21 CSS = 32790. ISS =332353. SGMA= 16.842 MSD =0.24468 RATO= 12.577 RBOR= 1.3930 RIN = 6.2845 RICS= 10.024 at 11450 Feet CCL =0.00000 SPD = 13.999 LS = 1894,7 SS = 36568. G1 = 5642.0 GE1S=149019. G2 = 514.56 GR = 61.831 MON = 2023.0 BKL = 173.88 BKS = 329.93 CSS = 23625. ISS =334241. SGMA= 35.926 MSD =0.39091 RATO= 19.326 RBOR= 1.5718 RIN = 6.5826 RICS= 13.862 at 11400 Feet CCL =0.00000 SPD = 13.999 LS = 4816.3 SS = 54427. G1 = 20426. GE1S=136751. G2 = 7386.2 GR = 22.647 MON = 2029.6 BKL = 64~392 BKS = 239.15 CSS = 34415. ISS =330750. SGMA= 15.628 MSD =0.15605 RATO= 11.314 RBOR= 1.3930 RIN = 6.2003 RICS= 9.5451 at 11359.25 Feet CCL = 300.00 SPD =0.00000 LS = 800.00 SS =0.00000 G1 =0.00000 GELS=0..00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-3.5000 Tape File Start Depth = 11655.000000 Tape File End.Depth = 11359.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 4 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED 12:16:36 HEADER STARTING DEPTH 11654.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 4 0.25000 32.0 0.000 at 11654 Feet CCL = 300.00 SPD =0.00000 LS = 2000.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=-3.0000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 at 11650 Feet CCL = 300.00 SPD = 10.589 LS = 2759.1 SS = 45088. G1 = 16099. GE1S=139601. G2 = 6078.8 GR =0.00000 MON = 2412.5 BKL = 74.576 BKS = 527.57 CSS = 30190. ISS =294818. SGMA= 15.096 MSD =0.77281 RATO= 16.414 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 at 11600 Feet CCL =0.00000 SPD = 13.999 LS = 1601.7 SS = ~6132. G1 = 7684.1 GE1S=144405. G2 = 1683.7 GR = 41.485 MON = 2006.4 BKL = 89.968 BKS = 227.90 CSS = 24191. ISS =300470. SGMA= 25.660 MSD =0.37085 RATO= 22.679 RBOR= 1.6053 RIN = 11.633 RICS= 11.234 at 11550 Feet CCL =0.00000 SPD = 13.999 LS = 2872.2 SS = 47296. G1 = 15760. GE1S=150922. G2 = 5248.2 GR -= 21.012 MON = 2008.3 BKL = 95.979 BKS = 246.94 CSS = 31395. ISS =306521. SGMA= 16.937 MSD =0.23425 RATO= 16.442 RBOR= 1.5197 RIN = 10.672 RICS= 9.9800 at 11500 Feet CCL =0.00000 SPD = 13.999 LS = 3082.5 SS = 47802. G1 = 16575. GE1S=149482. G2 = 5994.7 GR = 18.670 MON = 2006.0 BKL = 60.604 BKS = 215.10 CSS = 31872. ISS =305632. SGMA= 15.571 MSD =0.21546 RATO= 15.480 RBOR= 1.5397 RIN = 10.334 RICS= 9.7439 at 11450 Feet CCL =0.00000 SPD = 13.999 LS = 1042.6 SS = 30095. G1 = 3497.1 GE1S=155970. G2 = 269.30 GR = 47.599 MON = 1998.9 BKL = 143.49 BKS = 256.55 CSS = 21678. ISS =300510. SGMA= 41.642 MSD =0.49637 RATO= 28.837 RBOR= 1.6834 RIN = 11.322 RICS= 13.790 at 11400 Feet CCL =0.00000 SPD = 13.999 LS = 3449.6 SS = 49704. G1 = 17822. GE1S=155307. G2 = 6763.4 GR = 15.501 MON = 2008.6 BKL = 59.916 BKS = 204.55 CSS = 33514. ISS =307420. SGMA= 14.848 MSD =0.19495 RATO= 14.4.05 RBOR= 1.5216 RIN = 10.057 RICS= 9.1909 at 11358.25 Feet CCL = 300.00 SPD =0.00000 LS = 2000.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11654.000000 Tape File End Depth = 11358.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 5 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICETABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED' 12:39:31 HEADER STARTING DEPTH 11652.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 5 0.25000 32.0 0.000 at 11652 Feet CCL = 300.00 SPD =0.00000 LS = 2000.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-I.0000 RIN = 3.0000 RICS=-6.0000 at 11650 Feet CCL = 300.00 SPD =0.00000 LS = 2000.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.~0000 RIN = 3.0000 RICS=-6.0000 at 11600 Feet CCL =0.00000 SPD = 11.999 LS = 1684.2 SS = 39001. G1 = 9360.9 GE1S=146233. G2 = 2395.2 GR = 37.170 MON = 2017.6 BKL = 128.40 BKS = 255.01 CSS = 25848. ISS =291565. SGMA= 22.907 MSD =0.32197 RATO= 23.123 RBOR= 1.5923 RIN = 11.288 RICS= 11.659 at 11550 Feet CCL =0.00000 SPD = 11.999 LS = 2681.0 SS = 45098. G1 = 14541. GE1S=144300. G2 = 4778.9 GR = 30.493 MON = 2017.4 BKL = 85.712 BKS = 243.74 CSS = 29679. ISS =293972. SGMA= 16.965 MSD =0.17532 RATO= 16.783 RBOR= 1.5350 RIN = 10.582 RICS= 9.9103 at 11500 Feet CCL =0.00000 SPD = 11.999 LS = 2941.3 SS = 46219. G1 = 15578. GE1S=147244. G2 = 5481.4 GR = 23.536 MON = 2019.5 BKL = 79.726 BKS = 258.90 CSS = 30780. ISS =296997. SGMA= 15.985 MSD =0.28002 RATO= 15.711 RBOR= 1.5399 RIN = 10.450 RICS= 9.6628 at 11450 Feet CCL =0.00000 SPD = 11.999 LS = 997.51 SS = 29663. G1 = 3351.0 GE1S=151739. G2 = 242.69 GR = 59.617 MON = 2015.2 BKL = 159.94 BKS = 288.29 CSS = 21153. ISS =291097. SGMA= 42.670 MSD =0.38743 RATO= 29.776 RBOR= 1.6961 RIN = 11.436 ~RICS= 13.781 at 11400 Feet CCL =0.00000 SPD = 12.040 LS = 3397.5 SS = 47953. G1 = 17172. GE1S=152827. G2 = 6405.0 GR = 27.394 MON = 2022.8 BKL = 83.470 BKS = 225.90 CSS = 32483. ISS =301049. SGMA= 15.118 MSD =0.28-577 RATO= 14.127 RBOR= 1.5378 RIN = 10.325 RICS= 9.2814 at 11364.25 Feet CCL = 300.00 -SPD =0.00000 LS = 2000.0 SS = 12000. G1 =0.00000 GE1S=0.O0000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11652.000000 Tape File End Depth = 11364.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 6 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED· 13:57:38 HEADER STARTING DEPTH 11655.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 6 0.25000 32.0 0.000 at 11655 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.5000 a~ 11650 Feet CCL = 300.00 SPD = 13.999 LS = 2098.6 SS = 29689. G1 = 13118. GELS= 93282. G2 = 5297.5 GR =0.00000 MON = 2015.2 BKL = 83.535 BKS = 411.08 CSS = 20856. ISS =291596. SGMA= 13.705 MSD =0.17941 RATO= 14.143 RBOR= 1.7501 RIN = 10.570 RICS= 13.874 at 11600 Feet CCL =0.00000 SPD = 13.889 LS = 892.72 SS = 18873. G1 = 4085.2 GELS= 99365. G2 = 768.95 GR = 59.752 MON = 1993.5 BKL = 135.54 BKS = 264.91 CSS = 14070. ISS =299532. SGMA= 26.069 MSD =0.56782 RATO= 21.105 RBOR= 1.9967 RIN = 12.313 RICS= 19.879 at 11550 Feet CCL =0.00000 SPD = 13.999 LS = 2422.7 SS = 31480. G1 = 13045. GE1S=104594. G2 = 4812.2 GR = 26.948 MON = 1989.7 BKL = 72.701 BKS = 201.77 CSS = 21954. ISS =309914. SGMA= 15.176 MSD =0.20422 RATO= 12.995 RBOR= 1.7880 RIN = 10.662 RICS= 14.209 at 11500 Feet CCL =0.00000 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.5000 at 11495.25 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GE1S=0.O0000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.5000 Tape File Start Depth = 11655.000000 Tape File End Depth = 11495.250000 Tape File Level Spacing = 0.250000 .Tape File Depth Units = Feet Tape Subfile 7 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE DATE LOGGED TIME LOGGED HEADER STARTING DEPTH ***X PDKI*** FILE LABEL # 7 MAY 13 90 LEVEL SPACING 0.25000 14:22:31 SAMPLES/RECORD 32.0 11658.000 HEADER ENDING DEPTH 0.000 at 11658 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0'.00000 RATO=0.00000 RBOR=-I.O000 RIN = 3.0000 RICS=0.00000 at 11650 Feet CCL = 300.00 SPD = 12.999 LS = 2526.8 SS = 40209. G1 = 14876. GElS=132251. G2 = 5842.0 GR =0.00000 MON = 2016.8 BKL = 102.89 BKS = 581.03 CSS = 27848. ISS =293143. SGMA= 14.216 MSD =0.08764 RATO= 15.938 RBOR= 1.5558 RIN = 10.279 RICS= 10.495 at 11600 Feet CCL =0.00000 SPD = 12.999 LS = 1408.1 SS = 31101. G1 = 6243.1 GE1S=140038. G2 = 1475.0 GR = 57.815 MON = 2008.9 BKL = 136.63 BKS = 281.00 CSS = 21912. ISS =291870. SGMA= 22.911 MSD =0.48189 RATO= 22.083 RBOR= 1.6908 RIN = 11.428 RICS= 14.030 at 11550 Feet CCL =0.00000 SPD = 12.999 LS = 2635.8 SS = 40778. G1 = 14541. GElS=140355. G2 = 5226.0 GR = 31.439 MON = 2011.3 BKL = 118.73 BKS = 274.15 CSS = 28-368~. ISS =302455. SGMA= 15.595 MSD =0.18028 RATO= 15.512 RBOR= 1.5823 RIN = 10.416 RICS= 10.511 at 11500 Feet CCL =0.00000 SPD = 12.999 LS = 2771.3 SS = 41491. G1 = 14975.. GElS=142214. G2 =' 5578.2 GR = 24.539 MON = 2011.9 BKL = 89.177 BKS = 241.87 CSS = 28878. ISS =302795. SGMA= 15.118, MSD =0.10187 RATO= 14.995 RBOR= 1.6230 RIN = 10.344 RICS= 10.539 at 11450 Feet CCL =0.00000 SPD = 12.999 LS = 764.33 SS = 21288. G1 = 2171.2 GE1S=136172. G2 = 137.22 GR' = 61.089 MON = 2009.2 BKL = 135.24 BKS = 331.27 CSS = 17046. ISS =300976. SGMA= 44.334 MSD =0.81039 RATO= 27.776 RBOR= 1.8593 RIN = 11.425 RICS= 16.706 at 11400 Feet CCL =0.00000 SPD = 12.999 LS = 3214.2 SS = 44311. G1 = 16560. GE1S=148347. G2 = 6703.0 GR = 19.046 MON = 2011.9 BKL = 89.576 BKS = 260.03 CSS = 30957. ISS =305944. SGMA= 13.842 MSD =0.11907 RATO= 13.793 RBOR= 1.5797 RIN = 10.207 RICS= 9.8912 at 11370.25 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. IG1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11658.000000 Tape File End Depth = 11370.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 8 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED 14:46:59 HEADER STARTING DEPTH '11658.000 FILE LABEL LEVEL SPACING SAMPLES / RECORD HEADER ENDING DEPTH # 8 0.25000 32.0 0.000 at 11658 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i. O000 RIN = 3.0000 RICS=-6'.0000 at 11650 Feet CCL = 300.00 SPD = 15.998 LS = 2469.8- SS = 39046. G1 = 14517. GE1S=129443. G2 = 5677.8 GR =0.00000 MON = 2013.6 BKL = 122.40 BKS = 544.01 CSS = 27150. ISS =291041. SGMA= 14.456 MSD =0.13179 RATO= 15.814 RBOR= 1.5762 RIN = 10.413 RICS= 10.651 at 11600 Feet CCL =0.00000 SPD = 14.999 LS = 1506.8 SS = 32799. G1 = 7713.1 GElS=139167. G2 = 2088.3 GR = 47.062 MON = 2004.9 BKL = 143.40 BKS = 300.36 CSS = 22880. ISS =293468. SGMA= 21.468 MSD =0.43053 RATO= 21.697 RBOR= 1.6865 RIN = 11.522 RICS= 13.395 at 11550 Feet CCL =0.00000 SPD = 14.999 LS = 2380.0 SS = 38644. G1 = 13184. GElS=136030. G2 = 4648.7 GR = 39.452 MON = 2008.6 BKL = 140.21 BKS = 315.23 CSS = 26819. ISS =296204. SGMA= 15.848 MSD =0.16074 RATO= 16.219 RBOR= 1.6176 RIN = 10 ..577 RICS= 10.811 at 11500 Feet CCL =0.00000 SPD = 14.999 LS = 2356.9 SS = 31725. G1 = 12926. GElS=il5012. G2 = 4976.1 GR = 31.297 MON = 2005.5 BKL = 110.23 BKS = 285.47 CSS = 22966. ISS =301562. SGMA= 14.482 MSD =0.24524 RATO= 13.454 RBOR= 1.7983 RIN = 10.588 RICS= 13.117 at 11450 Feet CCL =0.00000 SPD = 14.999 LS = 856.37 SS = 25922. G1 = 2607.7 GElS=146587. · G2 = 163.23 GR = 69.454 MON = 2003.7 BKL = 170.19 BKS = 3~7.04 CSS = 19403. ISS =297065'. SGMA= 45.077 MSD '=0.58210 RATO= 30.226 RBOR= 1.7386 RIN = 11.365 RICS= 15.244 at 11400 Feet CCL =0.00000 SPD = 14.999 LS = 3157.2 SS = 43314. G1 = 15942. GElS=145079. G2 = 6277.6 GR = 37.264 MON = 2006.8 BKL = 91.885 BKS = 309.42 CSS = 30145. ISS =302304. SGMA= 14.170 MSD =0.12460 RATO= 13.726 RBOR= 1.6047 RIN = 10.299 RICS= 10.009 at 11370.25 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GEl.S=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11658.000000 Tape File End Depth = 11370.250000 Tape File Level Spacing = 0.250000 .Tape File Depth Units = Feet Tape Subfile 9 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKi*** DATE LOGGED MAY 13 90 TIME LOGGED 15:25:27 HEADER STARTING DEPTH 11658.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 9 0.25000 32.0 0.000 at 11658 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 at 11650 Feet CCL = 300.00 SPD = 12.040 LS = 2406.0 SS = 38270. GE1S=124544. G2 = 5581.5 GR =0.00000 MON = 2011.2 BKS = 653.16 CSS = 26400. ISS =285114. SGMA= 14.362 RATO= 15.916 .RBOR= 1.5812 RIN = 10.522 RICS= 10..789 G1 = 14165. BKL = 113.16 MSD =0.11333 at 11600 Feet CCL = 1323.7 SPD = 11.999 LS = 1521.4 SS = 32803. G1 = 8468.0 GElS=136430. G2 = 2240.7 GR = 45.797 MON = 1982.5 BKL = 155.08 BKS = 299.01 CSS = 22878. ISS =289326. SGMA= 21.614 MSD =0.41017 RATO= 21.602 RBOR= 1.7002 RIN = 11.184 RICS= 12.875 at 11550 Feet CCL =0.00000 SPD = 11.999 LS = 2414.5 SS = 37978. G1 = 13068. GE1S=133763. G2 = 4509.2 GR = 43.409 MON = 1981.2 BKL = 125.29 BKS = 331.34 CSS = 26195. ISS =294394. SGMA= 16.298 MSD =0.17895 RATO= 15.717 RBOR= 1.6500 RIN = 10,.632' RICS= 11,428 at 11500 Feet CCL =0.00000 ,SPD = 11.999 LS = 2390,1 SS = 31356. G1 = 13071. GE1S=109606. G2 = 4961.2 GR = 29.180 MON = 1980.2 BKL = 89.931 BKS = 286.87 CSS = 22488. ISS =298622. SGMA= 14.604 MSD =0.13105 RATO= 13.121 RBOR= 1.8252 RIN = 10.577 RICS= 13.360 at 11450 Feet CCL =0.00000 SPD = 11.999 LS = 862.58 SS = 25466. G1 = 2575.5 GE1S=144891. G2 = 190.72 GR = 63.069 MON = 1974.6 BKL = 154.66 BKS = 301.13 CSS = 19111. ISS =292229. SGMA= 44.314 MSD =0.78179 RATO= 29.392 RBOR= 1.7744 RIN = 11.477 RICS= 15.170 at 11400 Feet CCL =0.00000 SPD = 11.999 LS = 3090.5 SS = 42540. G1 = 15949. GE1S=142666. G2 = 6224.5 GR = 32.529 MON = 1980.8 BKL = 98.720 BKS = 296.74 CSS = 29805. ISS =298026. SGMA= 14.361 MSD =0.20902 RATO= 13.759 RBOR= 1.6047 RIN = 10.225 RICS= 10.052 at 11370.25 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11658.000000 Tape File End Depth = 11370.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 10 is type: BIT ARCO ALASKA INC. D.S. 18-11 SERVICE TABLE ***X PDKI*** DATE LOGGED MAY 13 90 TIME LOGGED 16:23:02 HEADER STARTING DEPTH 11657.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 10 0.25000 32.0 0.000 at 11657 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0~00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0'.00000 RATO=0.00000 RBOR=-i.0000 RIN = 3.0000 RICS=-6.0000 at 11650 Feet CCL = 300.00 SPD = 15.998 LS = 2341.1 SS = 37592. G1 = 13824. GE!S=122416. G2 = 5350.4 GR =0.00000 MON = 1973.3 BKL = 114.25 BKS = 624.56 CSS = 25819. ISS =278201. SGMA= 14.386 MSD =0.19206 RATO= 16.060 RBOR= 1.5726 RIN = 10.400 RICS= 10.839 at 11600 Feet CCL =0.00000 SPD = 14.999 LS = 1456.7 SS = 32433. G1 = 8512.8 GE1S=133464. G2 = 2280.9 GR = 48.203 MON = 2000.8~ BKL = 171.35 BKS = 265.43 CSS = 22612. ISS =287195. SGMA= 21.847 MSD =0.33470 RATO= 22.219 RBOR= 1.6774 RIN = 11.385 RICS= 13.285 at 11550 Feet CCL =0.00000 SPD = 14.999 LS = 2237.8 SS = 34889. G1 = 12439. GE1S=126816. G2 = 4395.8 GR = 38.086 MON ='2003.2 BKL = 128.93 BKS = 285.92 CSS = 24556. ISS =290320. SGMA= 15.847 MSD =0.19835 RATO= 15.575 RBOR= 1.6773 RIN = !0.788 RICS= 11.810 at 11500 Feet CCL =0.00000 SPD = 14.999 LS = 2321.8 SS· = 30910. G1 = 12576. GE1S=108797. G2 = 4761.8 GR = 30.763 MON = 2001.6 BKL = 117.40 BKS = 270.15 CSS = 22055. ISS =294789. SGMA= 14.850 MSD =0.17193 RATO= 13.311 'RBOR= 1.8303 RIN = 10.734 RICS= 13.314 at 11450 Feet CCL =0.00000 SPD = 14.999 LS = 813.83 SS = 24623. G1 = 2365.9 GE1S=141113. G2 = 104.12 GR = 63.808 MON = 2000.9 BKL = 185.60 BKS = 377.83 CSS = 18534. ISS =289507. SGMA= 46.370 MSD =0.46495 RATO= 30.154 RBOR= 1.7804 RIN = 11.548 RICS= 15.584 at 11400 Feet CCL =0.00000 SPD = 14.999 LS = 2972.8 SS = 41764. G1 = 15539. GE1S=138132. G2 = 6029.1 GR = 39.433 MON = 2002.4 BKL = 147.47 BKS = 298.39 CSS = 28974. ISS =295470. SGMA= 14.312 MSD =0.05845 RATO= 14.057 RBOR= 1.6119 RIN = 10.272 RICS= 10.136 at 11369.25 Feet CCL = 300.00 SPD =0.00000 LS = 1200.0 SS = 12000. G1 =0.00000 GELS=0.00000 G2 =0.00000 GR =0.00000 MON =0.00000 BKL =0.00000 BKS =0.00000 CSS =0.00000 ISS =0.00000 SGMA=0.00000 MSD =0.00000 RATO=0.00000 RBOR=rl.0000 RIN = 3.0000 RICS=-6.0000 Tape File Start Depth = 11657.000000 Tape File End Depth = 11369.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/12/30 ORIGIN : FLIC REEL NAME : 97511 CONTINUATION # : PREVIOUS REEL : CO~T : ARCO ALASKA INC, DS 18-11, PRUDHOE BAY, 50-029-21181-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/12/30 ORIGIN : FLIC TAPE NAME : 97511 CONTINUATION # : I PREVIOUS TAPE : COb~-IgT : ARCO ALASKA INC, DS 18-11, PRUDHOEBAY, 50-029-21181-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS API NUFI~ER : OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUIVI~ER : LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING DS 18-11D 500292118190 ARCO ALASKA INC. SCHLUMBERGER WELL SERVICES 30-DEC-97 97511 G. JOHNSON J. DETHLEFS 19 liN 1SE 1278 141CROFILI41 D oate_ ., , 431 48.00 47.00 14.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 00 9. 675 11062.0 47.00 O0 7. 000 11927.0 29.00 O0 5.500 43.0 17.00 3.500 10803.0 9.30 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 BASELINE CURVEFOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: 1 PASS NU~ER : 1 DATE LOGGED: 12-SEP-87 LOGGING COMPANY: ATLAS BASELINE DEPTH 88888.0 11774.5 11772.0 11768.5 11766.0 11763.0 11761.5 11758.5 11751.0 11748.0 11746.0 11737.5 11735.0 11730.0 11727.0 11726.5 11721.5 11720.0 11718.0 11716.5 I1715.5 11711.5 11707.5 11703.5 11701.0 11696.5 11695.0 11692.0 11678.0 11677.0 11674.5 11670.0 11667.5 11664.0 11663.5 11659.5 11659.0 11657.0 11649.5 11641.0 11639.0 11637.5 11633.0 11626.5 11621.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP 88888.0 88888.0 11766.0 11760.5 11750.0 11748.0 11735.0 11726.5 11720.5 11715.0 11704.5 11696.0 11693.5 11680.0 11675.5 11672.5 11667.0 11660.5 11658.0 11650.5 11642.0 11637.5 11626.5 11621.0 11774.5 11771.5 11770.0 11761.0 11756.5 11748.0 11739.5 11730.0 11726.5 11720.5 11717.5 11715.0 11710.5 11707.5 11701.5 11696.0 11680.0 11676.0 I1672.5 11666.5 11660.5 11642.0 11636.0 11627.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 11612.0 11612.0 11607.0 11607.5 11604.0 11604.0 11603.0 11604.0 11600.0 11600.5 11599.5 11600.5 11596.5 11596.0 11596.0 11596.0 11591.5 11592.0 11591.0 11593.0 11584.0 11584.0 11583.5 11583.5 11580.5 11580.5 11579.0 11578.5 11578.0 11578.5 11573.0 11572.5 11571.5 11572.0 11566.5 11563.5 11563.0 11563.5 11550.5 11550.0 11549.0 11550.0 11544.0 11544.5 11539.5 11540.0 11538.5 11540.0 11534.5 11534.0 11527.5 11528.5 11521.0 11521.0 11520.5 11521.0 11517.5 11518.5 11512.0 11514.0 11507.5 11507.5 11503.5 11503.5 11502.0 11503.5 11498.5 11499.5 11491.5 11492.0 11491.0 11491.5 11487.5 11486.5 11486.0 11486.5 11481.0 11481.0 11481.0 11474.0 11474.0 11467.5 11466.5 11462.5 11462.0 11461.5 11461.5 11450.0 11448.5 11445.5 11445.5 11444.5 11441.5 11441.5 11441.0 11438.0 11437.0 11437.5 11437.5 11434.0 11434.0 11432.5 11430.0 11430.5 11430.0 11427.0 11426.5 11423.5 11424.0 11421.0 11418.5 11419.0 11418.5 30-DEC-1997 13:53 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 11416.0 11415.0 11411.5 11411.5 11410.0 11411.0 11405.5 11406.0 11401.0 11402.0 11398.5 11397.5 11396.0 11397.5 11392.0 11392.0 11388.0 11388.5 11378.5 11377.5 11368.0 11368.0 11367.0 11368.5 11363.5 11362.0 11360.0 11360.0 11359.5 11357.5 11351.0 11350.0 11352.0 11344.5 11344.5 11336.0 11334.5 11334.0 11334.5 11332.5 11332.5 11328.0 11328.5 11325.0 11325.5 11317.5 11317.5 11313.5 11314.0 11310.0 11311.5 11306.0 11304.5 11302.0 11302.0 11301.5 11301.5 11299.0 11298.0 11292.5 11292.5 11284.0 11286.5 11281.5 11281.0 11278.0 11278.5 11269.0 11268.5 11267.5 11268.5 11262.0 11259.5 11259.0 11259.0 11257.0 11256.5 11255.0 11254.0 11241.5 11241.5 11239.5 11242.0 11237.5 11239.5 11230.5 11230.5 11231.0 11226.0 11228.0 11223.0 11224.0 11222.0 11221.5 11220.5 11221.0 11217.5 11217.5 11216.0 11217.0 11213.0 11215.0 11208.0 11209.0 11207.5 11206.S 11205.5 11206.5 11195.5 11196.5 11190.0 11190.5 11189.0 11191.0 30-DEC-1997 13:53 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 11184.5 11185.5 11184.0 11185.0 11180.0 11180.5 11174.5 11178.0 11171.0 11172.5 11170.0 11171.5 11167.5 11167.5 11164.0 11165.5 11160.0 11160.0 11159.5 11160.5 11157.0 11157.5 11156.5 11157.5 11152.5 11151.0 11151.5 11151.0 11149.5 11148.5 11143.5 11141.0 11138.5 11141.0 11137.0 11137.5 11132.5 11135.0 11132.5 11130.0 11132.5 11129.0 11128.5 11128.0 11128.5 11121.5 11122.0 11118.5 11118.0 11118.0 11119.0 11113.5 11115.0 11115.0 11109.0 11110.0 11109.5 11104.5 11107.0 11104.0 11106.5 11101.0 11101.5 11098.5 11098.5 11099.0 11092.0 11092.5 11092.5 11083.5 11084.5 11082.0 11084.0 11081.0 11081.5 11079.5 11081.5 11077.5 11077.5 11070.5 11072.0 11070.0 11068.0 11068.0 11065.5 11067.5 11069.5 11063.0 11065.0 100.0 97.5 102.0 $ CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE TDTP DATA AQUIRED ON ARCO ALASKA'S WELL DS 18-11. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEENDE GRCH BASE PASS #1 AND THE BCS GAFI~A RAY, ALSO BASE PASS #1 SIGMA TO THE BCS GAI~4A RAY CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX RBC SIZE : 1024 FILE TYPE : LO LAST FILE : 30-DEC-1997 13:53 PAGE: FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCRE~F2Fr: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11772 . 0 11062.0 TDTP 11782.0 11062.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP ~S: THIS FILE CONTAINS TDTP BASE PASS #1. THERE ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 * ALASKA COMPUTING CENTER * ****************************** * ............................ * ....... SCHLUMBERGER ....... * ****************************** COMPANY NAME : ARCO ALASKA INC. WELL NAIVE : DS iS~llD FIELD NAME : PRUDHOEBAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : S00292118190 REFERENCE NO : 97511 RECEIVED dali 07 1998 Alaska Oil & Gas Cons. Commissio~ Anchorage LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-I997 13:53 PAGE: TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT 1065822 O0 000 00 0 1 1 1 4 68 0000000000 SIGMTDTP CU 1065822 O0 000 00 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 00 000 00 0 i 1 1 4 68 0000000000 SBHFTDTP CU 1065822 00 000 O0 0 I 1 1 4 68 0000000000 SBHNTDTP CU 1065822 O0 000 O0 0 1 1 1 4 68 0000000000 SIGCTDTP CU 1065822 00 000 00 0 I 1 1 4 68 0000000000 SIBHTDTP CU 1065822 00 000 00 0 1 1 1 4 68 0000000000 TRAT TDTP 1065822 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 1065822 00 000 00 0 1 I 1 4 68 0000000000 SDSI TDTP CU 1065822 00 000 00 0 1 1 1 4 68 0000000000 BACK TDTP CPS 1065822 00 000 00 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 00 000 00 0 1 1 1 4 68 0000000000 TCANTDTP CPS 1065822 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 1065822 00 000 00 0 1 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 O0 0 I 1 1 4 68 0000000000 TCFD TDTP CPS 1065822 00 000 O0 0 i 1 1 4 68 0000000000 TSCNTDTP CPS 1065822 O0 000 O0 0 1 1 1 4 68 0000000000 TSCFTDTP CPS 1065822 00 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 1065822 00 000 00 0 1 1 1 4 68 0000000000 INFD TDTP CPS 1065822 00 000 00 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 O0 000 00 0 1 1 1 4 68 0000000000 TENS TDTP LB 1065822 00 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 1065822 O0 000 O0 0 1 1 1 4 68 0000000000 GR ECS GAPI 1065822 00 000 00 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11782.000 SIGM. TDTP 21.340 TPHI.TDTP 30.249 SBHF. TDTP SBHN. TDTP 46.528 SIGC. TDTP 2.890 SIBH. TDTP 51.318 TRAT. TDTP LCO1.TDTP 2.518 SDSI. TDTP 0.694 BACK. TDTP 65.068 FBAC. TDTP TCAN. TDTP 20366.867 TCAF. TDTP 8088.280 TCND. TDTP 20052.469 TCFD. TDTP 41.859 1.676 17.657 5881.036 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: TSCN. TDTP 4214.096 TSCF. TDTP 1673.541 INND . TDTP 2696.251 INFD. TDTP GRCH. TDTP -999. 250 TENS. TDTP 1470. 000 CCL. TDTP 0 . 000 GR. ECS DEPT. 11059.500 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1.TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP 43.688 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.BCS ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 437.077 80.993 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCP~EFIFITT: 0.5000 FILE SU~FiARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11772.0 11062.0 TDTP 11782.0 11062.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: BASELINE DBPTH 88888.0 11781.5 11771.0 11768.0 11761.5 11760.5 11758.0 11754.0 11750.0 11747.0 11742.5 11738.5 11738.0 11734.5 11733.5 11730.0 11726.5 11726.0 11720.5 11719.5 11715.5 11710.5 11708.0 11703.0 11700.0 11695.5 11694.5 11692.5 11688.5 11687.0 11684.5 11677.5 11676.5 11674.0 11667.0 11664.5 11662.0 11661.0 11659.0 11656.0 11651.0 11649.5 11647.0 11642.5 11639.0 11638.5 11636.0 11633.0 11626.0 11622.0 11612.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88887.5 88888.5 11782.0 11772.0 11770.0 11760.5 11760.0 11757.0 11753.5 11750.0 11748.0 11746.0 11738.5 11739.5 11735.5 11734.5 11730.0 11726.5 11726.5 11720.5 11720.5 11715.0 11715.5 11710.5 11708.0 11703.5 11701.5 11695.5 11696.0 11693.5 11690.5 11687.0 11685.5 11680.0 11680.0 11676.0 11672.5 11668.0 11664.0 11663.5 11660.5 11661.0 11657.5 11653.0 11651.0 11649.5 11642.0 11642.5 11638.0 11635.5 11636.0 11627.0 11627.0 11621.0 11612.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 10 11607.5 11607.5 11606.5 11608.0 11603.0 11604.0 11604.5 11599.5 11601.0 11596.0 11596.0 11595.5 11596.0 11591.5 11592.0 11590.5 11593.0 11586.0 11586.0 11583.5 11584.0 11583.0 11584.0 11581.0 11580.5 1158'0.5 11581.0 11579.0 11578.5 11576.5 11578.0 11572.0 11571.0 11571.0 11572.0 11564.5 11564.0 11558.5 11558.0 11557.0 11556.0 11551.0 11550.0 11547.5 11548.5 11544.5 11544.5 11541.0 11541.5 11539.5 11539.5 11539.0 11542.5 11535.5 11538.0 11532.5 11532.5 11527.0 11529.0 11520.5 11521.5 11517.0 11518.5 11512.5 11512.0 11508.5 11510.0 11507.0 11507.5 11502.0 11503.5 11491.0 11492.0 11490.5 11491.5 11481.5 11481.0 11479.5 11480.0 11473.0 11474.0 11466.0 11466.0 11465.5 11466.0 11461.0 11462.5 11461.5 11448.5 11449.0 11445.0 11442.5 11440.5 11440.5 11437.0 11437.5 11433.5 11434.0 11433.0 11430.5 11423.5 11422.0 11417.5 11418.5 11416.0 11415.0 11414.5 11413.0 11411.0 11409.5 11410.5 11411.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 11407.5 11406.5 11405.0 11406.0 11401.5 11402.0 11395.0 11397.5 11397.0 11392.0 11395.0 11389.0 11392.0 11384.5 11385.0 11382.0 11382.0 11379.0 11379.5 11377.0 11377.5 11371.5 11372.0 11367.5 11367.5 11366.5 11368.5 11361.0 11362.0 11360.0 11361.5 11354.0 11356.0 11351.5 11352.0 11340.5 11341.0 11335.5 11334.5 11334.5 11335.5 11332.5 11330.0 11329.0 11326.0 11327.5 11328.5 11316.5 11317.5 11311.0 11310.5 11309.5 11311.0 11298.5 11299.5 11298.0 11284.5 11286.0 11281.5 11283.0 11280.5 11283.5 11280.0 11281.0 11268.5 11271.0 11267.5 11268.0 11266.0 11266.0 11259.0 11258.0 11256.5 11256.5 11254.5 11254.5 11245.0 11246.0 11238.5 11242.0 11234.5 11235.0 11234.0 11235.0 11229.0 11231.0 11224.0 11224.0 11220.0 11221.0 11217.0 11217.5 11215.0 11217.0 11209.0 11209.0 11207.5 11209.0 11205.5 11206.5 11200.0 11201.5 11197.0 11199.0 11191.0 11195.0 11190.0 11190.5 11187.0 11190.5 11184.5 11185.5 30-DEC-i997 13:53 PAGB: 11 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 11183.5 11185.0 11182.0 11182.0 11173.5 11177.5 11173.0 11175.0 11170.5 11172.5 11169.5 11171.5 11165.5 11169.0 11163.5 11165.5 11159.5 11160.5 11158.5 11160.0 11156.5 11157.5 11151.0 11151.5 11150.0 11151.0 11147.5 11146.0 11144.0 11143.0 11140.0 11141.0 11139.0 11137.5 11135.0 11135.0 11131.5 11133.0 11127.5 11129.5 11126.0 11126.0 11124.5 11124.5 11121.5 11121.5 11118.0 11118.0 11113.0 11115.0 11107.0 11109.0 11104.0 11107.0 11103.5 11106.5 11101.0 11102.0 11098.5 11098.5 11096.5 11096.0 11090.5 11092.5 11086.5 11088.5 11085.0 11084.5 11081.5 11081.5 11077.0 11077.5 11068.0 11065.5 11067.0 11070.0 100.0 97.5 103.0 $ ~S: THIS FILE CONTAINS CASED HOLE TDTPBASE PASS #2. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORREI~TIONS BETWEEN GRCHBASE PASS #2 AND GRCH BASE PASS #1, ALSO SIGMA BASE PASS #2 TO SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA PAGE: 12 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE ~ CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~4 CODE (HEX) DEPT FT 1065822 O0 000 00 0 2 1 1 4 68 0000000000 SIGMTDTP CU 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 O0 000 00 0 2 1 1 4 68 0000000000 SBHF TDTP CU 1065822 00 000 00 0 2 1 1 4 68 0000000000 SBHNTDTP CU 1065822 O0 000 00 0 2 1 1 4 68 0000000000 SIGC TDTP CU 1065822 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TRAT TDTP 1065822 O0 000 00 0 2 1 1 4 68 0000000000 LCO1 TDTP 1065822 00 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 1065822 O0 000 00 0 2 1 I 4 68 0000000000 BACK TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 00 000 O0 0 2 1 i 4 68 0000000000 TCANTDTP CPS 1065822 00 000 00 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TSCNTDTP CPS 1065822 O0 000 O0 0 2 1 1 · 4 68 0000000000 TSCF TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 INND TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 INFD TDTP CPS 1065822 O0 000 00 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 O0 000 00 0 2 1 1 4 68 0000000000 TENS TDTP LB 1065822 O0 000 00 0 2 1 i 4 68 0000000000 CCL TDTP V 1065822 00 000 00 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 14 ** DATA ** DEPT. 11782. 500 SIGM. TDTP 21. 569 TPHI. TDTP 33 . 887 SBHF. TDTP SBHN. TDTP 47. 754 SIGC. TDTP 2. 925 SIBH. TDTP 54 . 072 TRAT. TDTP LCO1. TDTP 2. 629 SDSI. TDTP 0. 782 BACK. TDTP 147. 754 FBAC. TDTP TCAN. TDTP 19929.199 TCAF. TDTP 7581.838 TCND . TDTP 19501.656 TCFD. TDTP TSCN. TDTP 4138.199 TSCF. TDTP 1574.331 INND. TDTP 2354.$31 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP 1430. 000 CCL. TDTP 0. 000 44. 621 1. 739 31. 038 5646. 755 414. $28 ** END OF DATA ** **** FILE TRAILER **** FILE NAFIE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFIBER : 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 3 DEPTH INCREmENT: 0.5000 FILE SU~F~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11774.0 11062.0 TDTP 11782.0 11062.0 $ CURVE SHIFT DATA - PASS TO PASS (~EASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 15 BASELINE DEPTH 88888.0 11774.5 11771.5 11760.5 11759.5 11752.5 11750.0 11748.0 11739.5 11738.0 11734.5 11731.0 11730.0 11727.0 11726.5 11722.5 11719.5 11719.0 11716.0 11712.0 11711.5 11696.0 11694.5 11693.5 11692.5 11688.5 11685.0 11678.0 11674.5 11672.0 11671.0 11668.0 11665.0 11659.5 11659.0 11656.0 11650.5 11647.0 11641.5 11639.0 11636.5 11633.5 1.1627.0 11626.5 11621.5 11616.5 11613.0 11609.0 11608.5 11603.5 11600.0 11598.5 .......... EQUIVALENT UNSHIFTED DBPTH .......... GRCH TDTP 88887.5 88888.0 11774.5 11771.5 11760.0 11757.5 11751.5 1i 751.5 11748.0 11738.5 11740.0 11735.5 11731.0 11730.0 11726.5 I1726.5 11720.5 11720.0 11717.5 11715.0 11715.0 11711.0 11710.5 11696.0 11696.0 11693.5 11692.5 I 1689.5 11685.5 11680.0 11676.0 11674.5 11672.5 11672.5 11667.5 11660.5 11660.5 11658.0 11650.5 11649.5 11644.5 1I 642.5 11636.0 11636.0 11627.0 11626.5 11621.5 11621.5 11617.5 11613.5 11610.0 11607.5 11604.0 11600.5 11596.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 11596.0 11596.0 11591.0 11592.5 11590.5 11592.0 11586.5 11586.0 11584.0 11584.0 11581.0 11580.5 11580.5 11577.5 11578.0 11572.5 11571.0 11569.0 11566.5 11562.5 11560.0 11557.5 11556.0 11553.5 11552.5 11550.5 11550.0 11547.5 11548.5 11545.0 11544.5 11539.5 11539.5 11537.5 11536.5 11533.0 11532.0 11527.5 11529.0 11521.0 11521.0 11520.5 11521.5 11518.0 11518.5 11507.5 11509.0 11503.5 11500.0 11502.0 11503.5 11498.5 11495.5 11492.0 11492.0 11491.0 11491.5 11490.0 11488.5 11482.0 11481.0 11480.5 11480.5 11470.5 11470.5 11467.0 11466.5 11466.0 11466.0 11462.0 11462.0 11461.5 11461.5 11458.0 11458.0 11454.5 11454.0 11447.5 11447.5 11446.0 11445.5 11444.5 11442.0 11441.5 11440.5 11438.0 11437.5 11433.0 11433.5 11430.0 11426.5 11426.5 11420.0 11418.5 11419.0 11418.5 11415.0 11413.5 11411.0 11411.0 11405.5 11406.0 11403.5 11402.$ 11399.0 11397.5 11395.5 11397.5 11392.0 11391.5 11390.0 11391.5 30-DEC-1997 13:53 PAGE: 16 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 17 11384.0 11382.5 11375.5 11367.5 11367.0 11363.5 11362.5 11354.5 11351.5 11348.5 11345.0 11341.5 11334.5 11331.5 11325.0 11318.0 11314.5 11304.0 11302.5 11299.5 11288.0 11286.0 11285.0 11281.5 11269.5 11268.5 11267.0 11263.5 11263.0 11259.5 11259.0 11256.0 11245.0 11240.0 11235.0 11230.0 11225.0 11220.5 11215.5 11208.5 11206.5 11205.5 11204.5 11198.0 11196.0 11191.5 11184.5 11181.5 11178.0 11175.0 11173.5 11170.5 11167.0 11165.0 11164.5 11383.5 11375.5 11368.0 11362.5 11344.5 11334.5 11325.5 11302.0 11285.5 11283.0 11268.5 11266.0 11259.0 11232.0 11224.5 11218.0 11207.5 11204.5 11190.5 11185.5 11181.0 11175.5 11169.0 11165.0 11382.0 11368.5 11362.0 11356.0 11351.5 11349.5 11343.0 11332.0 11317.5 11314.0 11301.5 11298.0 11286.5 11281.5 11272.0 11267.0 11259.5 11257.0 11254.5 11247.5 11242.0 11231.5 11221.0 11217.0 11209.0 11206.5 11199.0 11197.0 11185.0 11179.0 1117S.5 11171.5 11165.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 11160.0 11160.0 11159.5 11160.5 11156.5 11156.5 11156.0 11156.5 11154.0 11151.0 11151.5 11151.5 11146.5 11144.5 11141.5 11141.0 11139.5 11141.0 11139.0 11137.5 11135.5 11135.0 11132.5 11133.0 11130.0 11132.0 11128.5 11129.5 11126.5 11126.0 11122.5 11122.0 11120.5 11118.5 11118.5 11118.0 11114.0 11115.0 11112.5 11112.0 11107.5 11106.5 11106.5 11107.0 11101.0 11101.5 11098.5 11098.5 11096.5 11096.0 11093.0 11092.5 11092.5 11092.5 11087.5 11089.0 11083.5 11084.5 11082.0 11081.5 11080.0 11081.5 11077.5 11077.5 11073.0 11072.5 11069.0 11068.0 11067.5 11065.5 11070.0 11062.0 11059.5 100.0 97.5 102.5 $ REFa%RKS: THIS FILE CONTAINS CASED HOLB TDTPBASE PASS #3. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCHBASE PASS #3 AND GRCH BASE PASS #1, ALSO SIGMA BASE PASS #3 TO SIGMA BASE PASS #I, CARRYINGALL TDTP CURVES WITH THB SIGMA SHIFTS. $ LIS FORMAT DATA PAGE: 18 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 19 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP EL~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 3 1 1 4 68 0000000000 SIGMTDTP CU 1065822 00 000 00 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 00 000 00 0 3 1 1 4 68 0000000000 SBHFTDTP CU 1065822 O0 000 00 0 3 1 1 4 68 0000000000 SBHNTDTP CU 1065822 00 000 00 0 3 1 1 4 68 0000000000 SIGC TDTP CU 1065822 00 000 00 0 3 1 1 4 68 0000000000 SIBH TDTP CU 1065822 00 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 1065822 O0 000 00 0 3 1 1 4 68 0000000000 LCO1 TDTP 1065822 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 1065822 O0 000 00 0 3 1 1 4 68 0000000000 BACK TDTP CPS 1065822 O0 000 00 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 O0 000 00 0 3 1 I 4 68 0000000000 TCANTDTP CPS 1065822 00 000 00 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 1065822 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 00 0 3 1 i 4 68 0000000000 TCFD TDTP CPS 1065822 00 000 00 0 3 1 1 4 68 0000000000 TSCNTDTP CPS 1065822 00 000 00 0 3 1 1 4 68 0000000000 TSCFTDTP CPS 1065822 00 000 00 0 3 1 1 4 68 0000000000 INND TDTP CPS 1065822 00 000 00 0 3 1 1 4 68 0000000000 INFD TDTP CPS 1065822 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 00 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 1065822 00 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 1065822 00 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center ** DATA ** 30-DEC-1997 13:53 DEPT. 11782. 000 SIGM. TDTP 20.212 TPHI. TDTP 31 . 566 SBHF. TDTP SBHN. TDTP 48. 611 SIGC. TDTP 3. 274 SIBH. TDTP 56. 091 TRAT. TDTP LCO1 . TDTP 2. 580 SDSI. TDTP 0. 788 BACK. TDTP 179. 998 FBAC. TDTP TCAN. TDTP 19453. 730 TCAF. TDTP 7539. 766 TCND. TDTP 19318.180 TCFD. TDTP TSCN. TDTP 4096. 519 TSCF. TDTP 1587. 705 INND . TDTP 2568. 857 INFD. TDTP GRCH. TDTP -999. 250 TENS. TDTP 1450. 000 CCL. TDTP 0. 000 PAGB: 20 38.554 1.710 38.362 5576.527 397.254 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUf4~ER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREmENT: 0.5000 FILE SU~m~RY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11774.0 11474.0 TDTP 11782.0 11474.0 $ CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUM~ER: 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 BASELINE DEPTH 88888.0 11782.0 11774.5 11771.5 11770.0 11765.0 11760.5 11757.0 11750.0 11747.5 11743.5 11739.0 11738.0 11735.0 11729.0 11726.5 11726.0 11721.0 11716.0 11714.0 11711.5 11711.0 11704.5 11696.5 11695.5 11685.5 11685.0 11680.0 11676.0 11674.0 11673.5 11671.5 11662.0 11659.0 11655.0 11649.5 11648.0 11641.5 11633.0 11631.0 i1625.5 11621.0 11616.0 11612.5 11608.0 11603.5 11603.0 11599.5 11596.0 11591.5 11590.5 11583.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP 88888.0 88888.0 11770.0 11765.5 11760.0 11750.0 11748.0 11738.5 11735.5 11729.5 11726.5 11715.5 11711.0 11704.5 11695.5 11687.0 11680.5 11676.5 11672.5 11664.0 11660.0 11658.0 11651.0 11649.0 11631.5 11626.5 11621.5 11604.0 11600.5 11596.0 11592.5 11583.5 11782.0 11775.0 11771.5 11760.5 11746.0 11740.0 11736.0 11726.5 11720.5 11715.5 11710.5 11695.5 11685.5 11680.0 11676.0 11661.0 11644.5 11636.0 11627.0 11617.S 11614.0 11610.0 11604.0 11596.0 11592.5 PAGE: 21 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 11580.5 11580.5 11580.0 11580.5 11577.5 11578.5 11572.5 11571.5 11568.5 11566.0 11563.5 11563.5 11561.5 11560.0 11556.5 11556.0 11550.0 11550.0 11543.5 11544.5 11540.0 11542.5 11539.0 11539.5 11526.5 11529.0 11520.5 11521.5 11521.0 11517.5 11519.0 11512.5 11512.0 11507.0 11507.5 11502.0 11503.5 11491.5 11492.0 11490.5 11491.5 11486.5 11487.0 11485.5 11486.5 11480.5 11481.0 11481.0 100.0 100.5 100.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BORAX PASS #1. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #1 AND GRCHBASE PASS #1, ALSO SIGMA BORAX PASS #1 TO SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. LIS FORMAT DATA PAGE: 22 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66- 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 1I 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 23 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUF~ NUF~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 4 1 1 4 68 0000000000 SIGMTDTP CU 1065822 O0 000 00 0 4 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 O0 000 00 0 4 1 1 4 68 0000000000 SBHF TDTP CU 1065822 00 000 00 0 4 1 1 4 68 0000000000 SBHNTDTP CU 1065822 O0 000 00 0 4 1 1 4 68 0000000000 SIGC TDTP CU 1065822 O0 000 00 0 4 1 1 4 68 0000000000 SIBHTDTP CU 1065822 O0 000 00 0 4 1 1 4 68 0000000000 TRATTDTP 1065822 O0 000 00 0 4 1 I 4 68 0000000000 LCO1 TDTP 1065822 00 000 00 0 4 1 1 4 68 0000000000 SDSI TDTP CU 1065822 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 1065822 00 000 00 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 00 000 00 0 4 1 1 4 68 0000000000 TCANTDTP CPS 1065822 00 000 00 0 4 1 1 4 68 0000000000 TCAF TDTP CPS 1065822 00 000 O0 0 4 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 00 0 4 1 1 4 68 0000000000 TCFD TDTP CPS 1065822 O0 000 O0 0 4 1 1 4 68 0000000000 TSCNTDTP CPS 1065822 O0 000 00 0 4 1 1 4 68 0000000000 TSCF TDTP CPS 1065822 O0 000 O0 0 4 1 1 4 68 0000000000 INND TDTP CPS 1065822 00 000 00 0 4 1 1 4 68 0000000000 INFD TDTP CPS 1065822 00 000 00 0 4 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 00 000 00 0 4 1 1 4 68 0000000000 TENS TDTP LB 1065822 00 000 00 0 4 1 1 4 68 0000000000 CCL TDTP V 1065822 00 000 00 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11782.000 SIGM. TDTP 21.958 TPHI. TDTP 32.615 SBHF. TDTP SBHN. TDTP 81.942 SIGC. TDTP 0.368 SIBH. TDTP 132.078 TRAT. TDTP LCO1.TDTP 2.266 SDSI. TDTP 0.656 BACK. TDTP 46.576 FBAC. TDTP TCAN. TDTP 11934.746 TCAF. TDTP 5266.459 TCND. TDTP 11079.258 TCFD. TDTP TSCN. TDTP 2528.974 TSCF. TDTP 1115.963 INND. TDTP 2349.390 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP 1490.000 CCL. TDTP 0.000 DEPT. 11474.500 SIG'M. TDTP 11.498 TPHI.TDTP 17.637 SBHF. TDTP SBHN. TDTP 83.226 SIGC. TDTP 0.157 SIBH. TDTP 117.291 TRAT. TDTP LCO1.TDTP 1.811 SDSI.TDTP 0.262 BACK. TDTP 86.029 FBAC. TDTP TCAN. TDTP 35113.180 TCAF. TDTP 19386.926 TCND. TDTP 17323.363 TCFD. TDTP TSCN. TDTP 7469.845 TSCF. TDTP 4124.301 IA~D. TDTP 2302.729 INFD. TDTP 65.049 1.564 15.602 3570.100 410.654 61. 935 1.474 20. 541 7753. 001 433. 254 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 24 GRCH. TDTP 24.328 TENS. TDTP 1500.000 CCL. TDTP 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU~ER : 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: DEPTH INCREFIENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11774 . 0 11484.0 TDTP 11782.0 11484.0 $ CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88890 · 5 88888.0 11782.0 11782.0 11774.0 11774.5 11771.5 11771.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 25 11767.5 11768.0 11765.5 11768.0 11762.5 11764.0 11761.5 11764.0 11761 . 0 11760.0 11757.0 11760.5 11755.0 11756.0 11754.0 11757.0 11752.0 11752.0 11749.0 11752.5 11747.5 11748.0 11747.0 11746.0 11740.5 11740.0 11739.0 11739.0 11737.5 11738.5 11734.0 11734.0 11735.0 11730.0 11730.0 I1729.5 11729.5 11726.5 11726.5 11726.5 11723 . 0 11720 . 5 11720.5 11720.5 11719.0 11718.0 11718.5 11718.5 11716.0 11715.5 11714.0 11715.5 11711.5 11711.0 11711.0 11710.5 11706.5 11706.5 11702.0 11701.5 11700.0 11699.0 11694.5 11696.0 11690.0 11689.5 11685.0 11683 . 5 11682.0 11685.5 11680.5 11680.0 11677.5 11680.0 11674.0 11676.0 11673.0 11675.5 11664 . 5 11667.0 11661.0 11663.0 11659.5 11660 . 5 11650.0 11651.0 11642.5 11641 . 5 11639.0 11642.0 11637.0 11636.0 11633.0 11636.0 11630.5 11631 . 5 11626.5 11627.0 11627.0 11621 . 0 11621.5 11618.0 11617.0 11615.0 11616.0 11612.5 11612.0 11607.5 11607.5 11606.5 11608.5 11604 . 0 11604 . 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 26 11603.0 11604.0 11596.5 11596.0 11596.0 11596.0 11591.0 11592.5 11589.5 11590.5 11584.5 11583.5 11584.0 11584.0 11581.0 11580.5 11580.5 11580.5 11578.0 11578.0 11574.0 11573.5 11572.0 11571.5 11566.5 11564.0 11564.5 11563.5 11562.0 11560.0 11561.5 11560.5 11557.0 11556.0 11555.0 11554.0 11552.0 11552.0 11548.0 11548.0 11546.5 11545.0 11540.5 11542.5 11535.5 11537.0 11535.0 11528.0 11529.0 11526.5 11527.0 11522.5 11521.5 11520.5 11521.0 11518.0 11519.0 11516.5 11517.0 11507.5 11507.5 11507.0 11509.0 11503.0 11503.0 11502.0 11503.0 11501.5 11501.5 11492.0 11492.0 11491.0 11491.5 11487.5 11489.5 11485.5 11487.0 100.0 101.5 100.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP BORAX PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #2 AND GRCH BASE PASS #1, ALSO SIGMA BORAX PASS #2 TO SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. · $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 27 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64ES ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 SIGMTDTP CU 1065822 00 000 00 0 5 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 O0 000 00 0 5 1 1 4 68 0000000000 SBHF TDTP CU 1065822 O0 000 O0 0 5 1 I 4 68 0000000000 SBHNTDTP CU 1065822 O0 000 00 0 5 1 1 4 68 0000000000 SIGC TDTP CU 1065822 00 000 00 0 5 1 1 4 68 0000000000 SIBH TDTP CU 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT TDTP 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 LCO1 TDTP 1065822 O0 000 00 0 5 1 i 4 68 0000000000 SDSI TDTP CU 1065822 O0 000 00 0 5 1 I 4 68 0000000000 BACK TDTP CPS 1065822 00 000 00 0 5 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 O0 000 00 0 5 1 1 4 68 0000000000 TCANTDTP CPS 1065822 00 000 O0 0 5 1 1 4 68 0000000000 TCAF TDTP CPS 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD TDTP CPS 1065822 O0 000 00 0 5 1 1 4 68 0000000000 TSCNTDTP CPS 1065822 O0 000 00 0 5' 1 1 4 68 0000000000 TSCF TDTP CPS 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 INND TDTP CPS 1065822 00 000 00 0 5 1 1 4 68 0000000000 INFD TDTP CPS 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 O0 000 00 0 5 1 1 4 68 0000000000 TENS TDTP LB 1065822 O0 000 O0 0 5 1 1 4 68 0000000000 CCL TDTp V 1065822 O0 000 00 0 5 1 I 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 28 ** DATA ** DEPT. 11782.000 SIGM. TDTP 21.142 TPHI.TDTP SBHN. TDTP 81.270 SIGC. TDTP 0.509 SIBH. TDTP LCO1.TDTP 2.269 SDSI. TDTP 0.687 BACK. TDTP TCAN. TDTP 11408.531 TCAF. TDTP 5027.939 TCND. TDTP TSCN. TDTP 2344.543 TSCF. TDTP 1033.281 INND.~TP GRCH. TDTP -999.250 TENS. TDTP 1505.000 CCL. TDTP DEPT. 11484.500 SIGTI. TDTP 11.517 TPHI. TDTP SBHN. TDTP 83.085 SIGC. TDTP 0.115 SIBH. TDTP LCOI.TDTP 1.939 SDSI. TDTP 0.185 BACK. TDTP TCAN. TDTP 35477.063 TCAF. TDTP 18297.563 TCND. TDTP TSCN. TDTP 7385.436 TSCF. TDTP 3809.094 INND. TDTP GRCH. TDTP -999.250 TENS. TDTP 1470.000 CCL. TDTP 31.484 SBHF. TDTP 130.552 TRAT. TDTP 89.590 FBAC. TDTP 10457.088 TCFD. TDTP 2368.418 INFD. TDTP 0.000 20.343 SBHF. TDTP 119. 416 TRAT. TDTP 112. 561 FBAC. TDTP 16866. 652 TCFD . TDTP 2319.998 INFD. TDTP 0.000 66.554 1.564 22.745 3373.819 387.244 60.653 1.570 24.167 7284.988 415.886 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH GRCH 11770.0 TDTP 11782.0 STOP DEPTH 11482.0 11482.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-i997 13:53 PAGE: 29 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 11775.0 11772.5 11767.5 11766.5 11762.0 11760.0 11751.0 11748.0 11740.0 11735.5 11730.5 11730.0 11728.0 11727.5 11721.5 11720.0 11716.5 11713.0 11712.0 11707.0 11701.0 11695.0 11690.5 11683.0 11681.5 11675.5 11673.5 11673.0 11667.0 11662.5 11660.5 11657.0 11656.5 11652.5 11651.0 1I 645.5 11643.5 11642.5 11640.5 11638.5 11633.5 11628.0 11627.0 11622.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88889.5 88887.5 11768.0 11760.0 11750.0 11748.0 11739.0 11729.5 11726.5 11720.5 11718.0 11715.0 11711.0 11696.0 11683.5 11676.0 11672.5 11667.0 11660.5 11658.0 11651.0 11642.0 11635.5 11627.0 11621.0 11774.5 11771.5 11767.5 11762.5 11753.0 11740.0 11736.0 11730.0 11726.5 11710.5 11705.5 11700.5 11690.0 11680.0 11676.0 11663.0 11657.5 11653.5 11648.0 11644.5 11642.0 11635.5 11627.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 30 11615.0 11614.5 11613.5 11612.0 11605.0 11604.0 11604.5 11604.0 11601.0 11601.0 11598.0 11596.0 11597.0 11596.0 11592.5 11592.5 11592.0 11592.0 11585.5 11584.0 11584.5 11584.5 11582.0 11580.5 11580.5 11573.0 11571.5 11570.0 11570.0 11569.0 11566.0 11563.5 11560.5 11562.5 11563.5 11560.5 11558.0 11559.0 11558.5 11555.5 11554.0 11552.0 11550.0 11549.0 11548.0 11541.5 11541.0 11540.5 11542.5 11537.0 11535.0 11536.5 11537.5 11528.5 11529.0 11524.0 11524.0 11523.0 11523.5 11519.0 11519.0 11516.0 11517.0 11515.0 11516.0 11511.5 11512.0 11508.5 11507.5 11508.0 11504.5 11503.5 11503.0 11502.0 11503.5 11493.0 11492.0 11492.0 11491.5 11488.5 11487.0 I00.0 98.5 99.5 $ REM_ARKS: THIS FILE CONTAINS CASED HOLE TDTP BORAX PASS #3. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #3 AND GRCHBASE PASS #1, ALSO SIGMA BORAX PASS #3 TO SIGMA BASE PASS #1, CARRYING ALL TDTP CURVES WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGB: 31 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 92 1 0.5 FT 11 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT 1065822 00 000 00 0 6 1 1 4 68 0000000000 SIGMTDTP CU 1065822 00 000 O0 0 6 1 1 4 68 0000000000 TPHI TDTP PU-S 1065822 00 000 00 0 6 1 1 4 68 0000000000 SBHF TDTP CU 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 SBHNTDTP CU 1065822 00 000 00 0 6 1 1 4 68 0000000000 SIGC TDTP CU 1065822 O0 000 00 0 6 1 1 4 68 0000000000 SIBHTDTP CU 1065822 O0 000 00 0 6 1 1 4 68 0000000000 TRAT TDTP 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 LCO1 TDTP 1065822 00 000 00 0 6 1 1 4 68 0000000000 SDSI TDTP CU 1065822 00 000 00 0 6 1 1 4 68 0000000000 BACK TDTP CPS 1065822 O0 000 O0 0 6 1 I 4 68 0000000000 FBAC TDTP CPS 1065822 00 000 O0 0 6 1 1 4 68 0000000000 TCAN TDTP CPS 1065822 00 000 00 0 6 1 1 4 68 0000000000 TCAFTDTP CPS 1065822 00 000 00 0 6 1 1 4 68 0000000000 TCND TDTP CPS 1065822 O0 000 00 0 6 1 1 4 68 0000000000 TCFD TDTP CPS 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 .TSCNTDTP CPS 1065822 O0 000 O0 0 6 1 1 '4 68 0000000000 TSCFTDTP CPS 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 INND TDTP CPS 1065822 O0 000 00 0 6 1 1 4 68 0000000000 INFD TDTP CPS 1065822 O0 000 O0 0 6 1 i 4 68 0000000000 GRCH TDTP GAPI 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 TENS TDTP LB 1065822 O0 000 O0 0 6 1 1 4 68 0000000000 CCL TDTP V 1065822 O0 000 00 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center ** DATA ** 30-DEC-1997 13:53 PAGE: DEPT. 11781.500 SIGM. TDTP 22.374 TPHI. TDTP 35.642 SBHF. TDTP 76.488 SBHN. TDTP 80. 376 SIGC. TDTP 0. 010 SIBH. TDTP 128. 525 TRAT. TDTP 1. 619 LCO1 . TDTP 2 . 349 SDSI. TDTP 0. 666 BACK. TDTP 108.556 FBAC. TDTP 28 . 169 TCAN. TDTP 12216. 498 TCAF. TDTP 5199. 657 TCND. TDTP 10494. 672 TCFD. TDTP 3450. 879 TSCN. TDTP 2529. 760 TSCF. TDTP 1076. 731 INND. TDTP 2393 . 754 INFD. TDTP 385. 097 GRCH. TDTP -999. 250 TENS. TDTP 1525. 000 CCL. TDTP 0. 000 -999. 250 SBHF. TDTP -999. 250 TRAT. TDTP -999. 250 FBAC. TDTP -999. 250 TCFD. TDTP -999. 250 INFD. TDTP -999. 250 DEPT. 11480. 500 SIGM. TDTP -999. 250 TPHI. TDTP SBHN. TDTP -999. 250 SIGC. TDTP -999. 250 SIBH. TDTP LCO1 . TDTP -999. 250 SDSI. TDTP -999. 250 BACK. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP TSCN. TDTP -999. 250 TSCF. TDTP -999.250 INND. TDTP GRCH. TDTP 43 . 594 TENS. TDTP -999.250 CCL. TDTP -999.250 -999.250 -999.250 -999.250 -999.250 32 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAM~ : EDIT .007 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INC~ 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS TDTP 1, 2, 3, $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 33 REM_ARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF BASE PASSES 1,2, &3 OF THE TDTP TOOL. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 84 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAFIE SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 SIGM PNAV CU 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 TPHI PNAV PU-S 1065822 O0 000 00 0 7 I 1 4 68 0000000000 SBHF PNAV CU 1065822 00 000 00 0 7 1 I 4 68 0000000000 SBHNPNAV CU 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 SIGC PNAV CU 1065822 O0 000 00 0 7 1 1 4 68 0000000000 SIBH PNAV CU 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT PNAV 1065822 O0 000 O0 0 7 1 i 4 68 0000000000 SDSI PNAV CU 1065822 O0 000 00 0 7 1 1 4 68 0000000000 BACK TDTP CPS 1065822 O0 000 00 0 7 1 1 4 68 0000000000 FBAC TDTP CPS 1065822 O0 000 00 0 7 1 1 4 68 0000000000 TCANPNAV CPS 1065822 O0 000 00 0 7 1 I 4 68 0000000000 TCAFPNAV CPS 1065822 00 000 00 0 7 1 1 4 68 0000000000 TCNDPNAV CPS 1065822 O0 000 00 0 7 1 1 4 68 0000000000 TCFDPNAV CPS 1065822 O0 000 00 0 7 1 1 4 68 0000000000 TSCNPNAV CPS 1065822 O0 000 00 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 34 NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EDE~ CODE (HEX) TSCF PNAV CPS 1065822 00 000 00 0 7 1 1 4 68 0000000000 INNDPNAV CPS 1065822 00 000 O0 0 7 1 I 4 68 0000000000 INFD PNAV CPS 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 LCO1 PNAV 1065822 0'0 000 00 0 7 1 1 4 68 0000000000 GRCH TDTP GAPI 1065822 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11782.000 SIGM. PNAV 21.248 TPHI.PNAV 31.498 SBHF. PNAV 42.174 SBHN. PNAV 47.473 SIGC. PNAV 3.068 SIBH. PNAV 53.579 TRAT. PNAV 1.694 SDSI.PNAV 0.769 BACK. TDTP 65.068 FBAC. TDTP 17.657 TCAN. PNAV 19622.027 TCAF. PNAV 7658.394 TCND. PNAV 19537.160 TCFD. PNAV 5681.461 TSUN. PNAV 4089.675 TSCF. PNAV 1596.091 INND.PNAV 2532.434 INFD.PNAV 416.105 LCO1.PNAV 2.563 GRCH. TDTP -999.250 DEPT. 11059.500 SIGM. PNAV -999.250 TPHI.PNAV -999.250 SBHF. PNAV -999.250 SBHN. PNAV -999.250 SIGC. PNAV -999.250 SIBH. PNAV -999.250 TRAT. PNAV -999.250 SDSI.PNAV -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. PNAV -999.250 TCAF. PNAV -999.250 TCND. PNAV -999.250 TCFD. PNAV -999.250 TSUN. PNAV -999.250 TSCF. PNAV -999.250 INND. PNAV -999.250 INFD. PNAV -999.250 LCO1.PNAV -999.250 GRCH. TDTP 43.688 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 35 FILE HEADER FILE NUMBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: I DEPTH INC~EFIENT: 0.5000 FILE SUF~4ARY VENDOR TOOL CODE START DEPTH TDTP 11808.0 $ LOG HEADER DATA STOP DEPTH 11038.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): I5-SEP-97 CP 42.2 1405 I5-SEP-97 11800.0 11797.0 11050.0 11790.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~E4A RAY TDTP THERMAL DECAY $ CGRS-A-862 TDT SET 21 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 11927.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~PERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE/BORAX WATER 40.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGB: 36 TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): ~S: TIED INTO BHCS DATED 9/12/87 ... PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSESMADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PBRFS ~ 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14. 65 FT 15 66 68 16 66 1 0 66 I LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 37 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP BLUff CODE (HEX) FT 1065822 O0 000 O0 0 8 1 1 4 68 0000000000 DEPT SIGM PS1 CU 1065822 O0 000 O0 0 8 1 1 4 68 TPHI PS1 PU 1065822 O0 000 O0 0 8 1 1 4 68 SBHF PS1 CU 1065822 00 000' O0 0 8 1 I 4 68 SBHNPS1 CU 1065822 O0 000 00 0 8 1 1 4 68 SIGC PS1 CU 1065822 00 000 00 0 8 1 1 4 68 SIBH PS1 CU 1065822 O0 000 O0 0 8 I 1 4 68 TRAT PSI 1065822 00 000 00 0 8 1 1 4 68 LCO1 PS1 1065822 00 000 00 0 8 1 1 4 68 SDSI PS1 CU 1065822 O0 000 00 0 8 1 1 4 68 BACK PS1 CPS 1065822 00 000 O0 0 8 1 1 4 68 FBAC PSI CPS 1065822 00 000 00 0 8 1 1 4 68 TCANPS1 CPS 1065822 00 000 O0 0 8 I 1 4 68 TCAFPS1 CPS 1065822 O0 000 00 0 8 i 1 4 68 TClgD PS1 CPS 1065822 O0 000 O0 0 8 1 1 4 68 TCFD PS1 CPS 1065822 00 000 00 0 8 1 1 4 68 TSCN PS1 CPS 1065822 00 000 00 0 8 1 1 4 68 TSCF PS1 CPS 1065822 00 000 00 0 8 1 1 4 68 INNDPS1 CPS 1065822 O0 000 O0 0 8 1 I 4 68 INFD PS1 CPS 1065822 00 000 O0 0 8 1 1 4 68 TENS PS1 LB 1065822 00 000 00 0 8 1 1 4 68 GR PS1 GAPI 1065822 O0 000 00 0 8 1 1 4 68 CCL PS1 V 1065822 O0 000 O0 0 8 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT. 11800.000 SIGM. PS1 35.822 TPHI.PS1 53.927 SBHF. PSi SBHN. PS1 57.373 SIGC. PS1 1.036 SIBH. PS1 76.343 TRAT. PS1 LCO1.PS1 3.004 SDSI.PS1 1.043 BACK. PSI 60.970 FBAC. PS1 TCAN. PS1 22166.703 TCAF. PS1 6946.962 TCND.PS1 16331.676 TCFD.PS1 TSCN. PSl 2246.078 TSCF. PS1 747.626 INND. PSI 2709.922 INFD.PS1 TENS.PSi 1455.000 GR.PS1 34.375 CCL.PS1 0.000 DEPT. 11037.000 SIGM. PS1 '33.989 TPHI.PS1 73.041 SBHF. PS1 SBHN. PS1 54.483 SIGC. PS1 0.461 SIBH. PS1 69.786 TRAT. PS1 LCO1.PS1 3.794 SDSI.PS1 0.977 BACK. PSi 173.405 FBAC. PS1 TCAN. PS1 23199.777 TCAF. PS1 5921.104 TCND.PS1 16472.289 TCFD. PS1 TSCN. PS1 2686.426 TSCF. PS1 708.024 INND.PS1 2601.026 INFD. PS1 TENS.PSi 1380.000 GR.PS1 165.375 CCL.PS1 0.000 36.397 I. 650 8. 583 4195. 354 364. 477 48. 675 2.131 34. 721 3956. 458 386. 382 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 38 **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCRE~F2Fr: 0.5000 FILE SUF~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11810.0 11034.0 TDTP LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO) TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~A RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 15-SEP-97 CP 42.2 1405 15-SBP-9? 11800.0 11797.0 11050.0 11790.0 1800.0 TOOL NUMBER CGRS-A-862 TDT SET 21 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 15:53 PAGE: 39 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11062.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE Tb~4PERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE 40.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 ~ COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REFIARKS: TIED INTO BHCS DATED 9/12/87 ... PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSES MADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PERFS @ 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 40 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) PT 1065822 O0 000 00 0 9 1 1 4 68 0000000000 CU 1065822 O0 000 O0 0 9 1 i 4 68 0000000000 PU 1065822 O0 000 00 0 9 1 1 4 68 0000000000 CU 1065822 00 000 O0 0 9 1 1 4 68 0000000000 CU 1065822 O0 000 00 0 9 1 1 4 68 0000000000 CU 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CU 1065822 O0 000 00 0 9 I 1 4 68 0000000000 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CU 1065822 O0 000 00 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CPS 1065822 00 000 O0 0 9 I 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 I 1 4 68 0000000000 CPS 1065822 O0 000 00 0 9 1 1 4 68 0000000000 CPS 1065822 O0 000 O0 0 9 1 I 4 68 0000000000 CPS 1065822 00 000 00 0 9 1 1 4 68 0000000000 LB 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 GAPI 1065822 00 000 O0 0 9 1 i 4 68 0000000000 DEPT SIGM PS2 TPHI PS2 SBHF PS2 SBHNPS2 SIGC PS2 SIBH PS2 TRAT PS2 LCO1 PS2 SDSI PS2 BACK PS2 FBAC PS2 TCANPS2 TCAFPS2 TCND PS2 TCFD PS2 TSCNPS2 TSCF PS2 INND PS2 INFDPS2 TENS PS2 GR PS2 CCL PS2 V 1065822 O0 000 O0 0 9 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center ** DATA ** DEPT. 11800.000 SIGM. PS2 SBHN. PS2 51.131 SIGC. PS2 LCO1.PS2 3.548 SDSI. PS2 TCAN. PS2 23907.367 TCAF. PS2 TSCN. PS2 2309.496 TSCF. PS2 TENS. PS2 1425.000 GR.PS2 DEPT. 11033.000 SIGM. PS2 SBHN. PS2 61.865 SIGC. PS2 LCO1.PS2 4.139 SDSI.PS2 TCAN. PS2 20957.313 TCAF. PS2 TSCN. PS2 2253.807 TSCF. PS2 TENS.PS2 1370.000 GR.PS2 30-DEC-1997 13:53 PAGE: 41 39.131 TPHI.PS2 61.694 SBHF. PS2 40.488 0.833 SIBH. PS2 62.183 TRAT. PS2 1.826 1.105 BACK. PS2 179.435 FBAC. PS2 51.373 6529.870 TCND.PS2 16770.027 TCFD.PS2 4263.829 650.975 INND. PS2 2842.055 INFD. PS2 343.424 40.313 CCL.PS2 0.000 37.801 TPHI.PS2 81.641 SBHF. PS2 54.566 0.000 SIBH. PS2 86.532 TRAT. PS2 2.151 1.519 BACK. PS2 207.367 FBAC. PS2 40.526 5008.687 TCND. PS2 15586.~41 TCFD.PS2 3635.708 544.531 INND.PS2 2709.634 INFD. PS2 392.077 53.469 CCL.PS2 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUF~ER : 3 DEPTH INCREFIENT: O. 5000 FILE SUF~qARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 11814.0 11034.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 42 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAFIMA RAY TDTP THERMAL DECAY $ 15-SBP-97 CP 42.2 1405 15-SEP-97 11800.0 11797.0 11050.0 11790.0 1800.0 TOOL NUMBBR CGRS-A-862 TDT SET 21 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11062.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~4PERATURB (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE 40.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHCS DATED 9/12/87 ... LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGB : 43 PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSES MADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PERFS ~ 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 1I 66 1i 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 10 1 1 4 68 0000000000 SIGM PS3 CU 1065822 O0 000 00 0. 10 1 1 4 68 0000000000 TPHI PS3 PU 1065822 00 000 00 0 10 i 1 4 68 0000000000 SBHF PS3 CU 1065822 00 000 O0 0 10 1 1 4 68 0000000000 SBHNPS3 CU 1065822 O0 000 00 0 I0 1 1 4 68 0000000000 SIGC PS3 CU 1065822 00 000 00 0 10 1 1 4 68 0000000000 SIBH PS3 CU 1065822 00 000 O0 0 10 1 1 4 68 0000000000 TRAT PS3 1065822 00 000 00 0 10 1 1 4 68 0000000000 LCO1 PS3 1065822 00 000 00 0 10 i I 4 68 0000000000 SDSI PS3 CU 1065822 00 000 O0 0 10 1 1 4 68 0000000000 BACK PS$ CPS 1065822 00 000 O0 0 10 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-i997 13:53 PAGE: 44 NAME SERV UNIT SERVICE API API API API FILE NUMB ArOMIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HE;f) FBAC PS3 CPS 1065822 O0 000 O0 0 10 1 i 4 68 0000000000 TCANPS3 CPS 1065822 00 000 00 0 10 1 1 4 68 0000000000 TCAFPS3 CPS 1065822 O0 000 00 0 10 1 1 4 68 0000000000 TCNDPS3 CPS 1065822 O0 000 00 0 10 1 1 4 68 0000000000 TCFD PS3 CPS 1065822 O0 000 00 0 10 1 1 4 68 0000000000 TSCNPS3 CPS 1065822 00 000 00 0 10 1 1 4 68 0000000000 TSCF PS3 CPS 1065822 O0 000 00 0 10 1 1 4 68 0000000000 INNDPS3 CPS 1065822 O0 000 O0 0 10 1 1 4 68 0000000000 INFD PS3 CPS 1065822 O0 000 00 0 10 1 1 4 68 0000000000 TENS PS3 LB 1065822 O0 000 O0 0 10 1 1 4 68 0000000000 GR PS3 GAPI 1065822 O0 000 O0 0 10 1 1 4 68 0000000000 CCL PS3 V 1065822 O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 11800.000 SIGM. PS3 40.132 TPHI.PS3 59.107 SBHF. PS3 39.785 SBHN. PS3 50.572 SIGC. PS3 0.993 SIBH. PS3 60.914 TRAT. PS3 1.773 LCO1.PS3 3.537 SDSI.PS3 0.956 BACK. PS3 219.628 FBAC. PS3 50.200 TCAN. PS3 22057.820 TCAF. PS3 5976.127 TCND. PS3 15613.311 TCFD.PS3 3821.455 TSCN. PS3 1981.895 TSCF. PS3 560.277 INND. PS3 2442.419 INFD.PS3 387.904 TENS.PS3 1435.000 GR.PS3 45.844 CCL.PS3 0.000 DEPT. 11044.000 SIGM. PS3 23.373 TPHI.PS3 53.265 SBHF. PS3 48.034 SBHN. PS3 54.921 SIGC. PS3 1.552 SIBH. PS3 70.779 TRAT. PS3 2.037 LCO1.PS3 3.108 SDSI.PS3 0.829 BACK. PS3 215.843 FBAC. PS3 48.691 TCAN. PS3 19900.281 TCAF. PS3 6402.435 TCND. PS3 19432.867 TCFD.PS3 5135.932 TSCN. PS3 4225.919 TSCF. PS3 1359.587 INND. PS3 27B8.564 INFD.PS3 383.831 TENS.PS3 1355.000 GR.PS3 89.313 CCL.PS3 -0.141 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 45 **** FILE HEADER **** FILB NAME : EDIT .011 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SO?4FIARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11812.0 11474.0 TDTP LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMM~A RAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~IPERATURE (DEGF) : BOTTOM HOLE TE~IPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 15-SEP-97 CP 42.2 1405 15-SEP-97 11800.0 11797.0 11050.0 11790.0 1800.0 TOOL NUMBER CGRS-A-862 TDT SET 21 11.062.0 CRUDE 40.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC~1997 15:$3 PAGE: 46 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATB NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHCS DATED 9/12/87 PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSES MADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PERFS ® 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 1I LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 47 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DEPT FT 1065822 O0 000 00 0 11 ' 1 1 4 68 0000000000 SIGM BX1 CU 1065822 O0 000 O0 0 11 i 1 4 68 0000000000 TPHI BX1 PU 1065822 O0 000 O0 0 I1 1 1 4 68 0000000000 SBHFBJfl CU 1065822 O0 000 O0 0 11 1 1 4 68 0000000000 SBHNBX1 CU 1065822 00 000 00 0 11 1 1 4 68 0000000000 SIGCBX1 CU 1065822 00 000 O0 0 11 1 1 4 68 0000000000 SIBH EX1 CU 1065822 00 000 00 0 11 1 1 4 68 0000000000 TRAT EX1 1065822 00 000 00 0 11 1 1 4 68 0000000000 LCO1 BX1 1065822 O0 000 00 0 11 1 1 4 68 0000000000 SDSI EX1 CU 1065822 00 000 00 0 11 1 1 4 68 0000000000 BACK EX1 CPS 1065822 00 000 00 0 I1 1 1 4 68 0000000000 FBACBX1 CPS 1065822 O0 000 O0 0 11 1 1 4 68 0000000000 TCANBX1 CPS 1065822 O0 000 00 0 11 1 1 4 68 0000000000 TCAFBX1 CPS 1065822 O0 000 O0 0 11 1 1 4 68 0000000000 TCNDBX1 CPS 1065822 O0 000 O0 0 11 1 I 4 68 0000000000 TCFDBX1 CPS 1065822 O0 000 O0 0 11 I 1 4 68 0000000000 TSCNBX1 CPS 1065822 00 000 00 0 11 1 1 4 68 0000000000 TSCF BX1 CPS 1065822 00 000 00 0 11 1 1 4 68 0000000000 INNDBX1 CPS 1065822 O0 000 O0 0 11 1 1 4 68 0000000000 INFDBX1 CPS 1065822 O0 000 O0 0 11 1 1 4 68 0000000000 TENS BX1 LB 1065822 O0 000 00 0 11 1 1 4 68 0000000000 GR- BX1 GAPI 1065822 O0 000 00 0 11 1 1 4 68 0000000000 CCL EX1 V 1065822 O0 000 00 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 11800.000 SIGM. BX1 22.674 TPHI.BXI 24.154 SBHF. BX1 67.008 SBHN. BX1 80.245 SIGC.BX1 0.013 SIBH. BXI 117.945 TRAT. EX1 1.333 LCO1.BX1 2.488 SDSI.BX1 0.112 BACK. EX1 107.204 FBAC. BX1 55.664 TCAN. BX1 4421.586 TCAF. BX1 1776.942 TCND.BXI 8602.418 TCFD.EX1 2384.750 TSCN. BX1 871.820 TSCF. BX1 350.366 INND.BX1 2510.355 INFD.BX1 410.337 TENS.EX1 1510.000 GR.BX1 36.156 CCL.BX1 0.000 DEPT. 11472.000 SIGM. BX1 11.302 TPHI.BX1 17.539 SBHF. BX1 64.162 SBHN. BX1 81.081 SIGC. BX1 0.091 SIBH. BX1 113.355 TRAT. EX1 1.479 LCO1.BX1 1.797 SDSI.BX1 0.178 BACK. EX1 86.787 FBAC.BX1 20.103 TCAN. BX1 36944.109 TCAF. BX1 20563.270 TCND.BX1 17676.449 TCFD.BX1 8064.648 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 48 TSCN. BX1 7873.297 TSCF. BX1 TENS.BXl 1500.000 GR.BXl 4382.314 INND.BX1 20.359 CCL.BXl 2351.742 INFD.BX1 -0.095 425.792 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01COI DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 12 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 5 DEPTH INCRb]~_~f: 0.5000 FILE SUF~L%RY VENDOR TOOL CODE START DEPTH STOP DEPTH 11810.0 11484.0 TDTP LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) 15-SEP-97 CP 42.2 1405 15-SEP-97 11800.0 11797.0 11050.0 11790.0 1800.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP THERMAL DECAY $ TOOL NUMBER CGRS-A-862 TDT SET 21 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11062.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TENPBRATURE (DEGF) : BOTTOM HOLE TENPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE 40.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUBLINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 ArEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): ~S: TIED INTO BHCS DATED 9/12/87 ... PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSES MADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PERFS ® 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #~. $ LIS FORMAT DATA PAGE: 49 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 50 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT I1 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) DBPT FT 1065822 O0 000 00 0 12 1 1 4 68 0000000000 SIGMBX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TPHIBX2 PU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 SBHF BX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 SBHNBX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 SIGCBX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 SIBHBX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TRATBX2 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 LCO1 EX2 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 SDSIBX2 CU 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 BACK BX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 FBAC BX2 CPS 1065822 O0 000 00 0 12 1 1 4 68 0000000000 TCANBX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TCAFBX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TCNDBX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TCFDBX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 TSCNBX2 CPS 1065822 O0 000 00 0 12 1 1 4 68 0000000000 TSCFBX2 CPS 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 INNDBX2 CPS 1065822 00 000 00 0 12 1 1 4 68 0000000000 INFDBX2 CPS 1065822 O0 000 00 0 12 1 1 4 68 0000000000 TENS BX2 LB 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 GR BX2 GAPI 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 CCL EX2 V 1065822 O0 000 O0 0 12 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 5I ** DATA ** DEPT. 11800.000 SIGM. BX2 11.996 TPHI.BX2 22.979 SBHF. BX2 SBHN. BX2 79.843 SIGC. BX2 0.000 SIBH. BX2 115.481 TRAT. BX2 LCO1.BX2 3.154 SDSI.BX2 3.227 BACK. EX2 112.785 FBAC.BX2 TCAN. BX2 4096.563 TCAF. BX2 1298.860 TCND.BX2 8038.097 TCFD.BX2 TSCN. BX2 825.627 TSCF. BX2 261.774 INND.BX2 2571.066 INFD.BX2 TENS.BX2 1510.000 GR.BX2 48.938 CCL.BX2 0.000 DEPT. 11483.500 SIGM. BX2 12.067 TPHI.BX2 20.048 SBHF. BX2 SBHN. BX2 82.229 SIGC. BX2 0.138 SIBH. BX2 117.999 TRAT. BX2 LCO1.BX2 1.915 SDSI.BX2 0.201 BACK.BX2 116.176 FBAC. BX2 TCAN. BX2 32604.586 TCAF. BX2 17023.219 TCND.BX2 16175.666 TCFD.BX2 TSCN. BX2 6788.103 TSCF. BX2 3544.145 INND.BX2 2321.392 INFD.BX2 TENS.BX2 1475.000 GR.BX2 29.656 CCL.BX2 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 81.284 1.645 35.537 2140.170 336.041 61.112 1.541 23.771 6919.647 405.159 **** FILE HEADER **** FILE NA~E : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFIBER 13 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 6 DEPTH INCREFIENT: 0.5000 FILE SU~rn~Y VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: 52 TDTP LOG HEADER DATA DATE LOGGED: 11808.0 SOFTWARE VERSION: TItlE LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 11482.0 15-SEP-97 CP 42.2 1405 15-SEP-97 11800.0 11797.0 11050.0 11790.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP THERMAL DECAY $ CGRS-A- 862 TDT SET 21 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 11062.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~PERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE 40.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGE: S3 ~: TIED INTO BHCS DATED 9/12/87 ... PUMPED 150 BBLS CRUDE AT 4-5 BPM INTO TUBING THEN MADE 3 BASE PASSES WHILE PUMPING AT 1 BPM BORAX PASSES MADE WITH 105,126, & 140 BBLS BORAX BEHIND PIPE. NO CHANNELS UP FROM TOP PERFS. SQUEEZED PERFS ~ 11672' - 11674' ARE LEAKING GOC AT 11,592' THIS FILE CONTAINS THE RAW DATA FOR PASS #6. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 SIGMBX3 CU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 TPHIBX3 PU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 SBHF BX3 CU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 SBHNBX3 CU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 SIGCBX3 CU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 SIBH EX3 CU 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 TRAT EX3 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-1997 13:53 PAGB: 54 NAF1E SERV UNIT SERVICE API API API API FILE NUF~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) LCO1 BX3 1065822 00 000 00 0 13 1 1 4 68 0000000000 SDSIBX3 CU 1065822 00 000 00 0 13 1 1 4 68 0000000000 BACK BX3 CPS 1065822 O0 000 00 0 13 1 1 4 68 0000000000 FBAC BX3 CPS 1065822 O0 000 00 0 13 1 1 4 68 0000000000 TCANBX3 CPS 1065822 00 000 O0 0 13 1 1 4 68 0000000000 TCAFBX3 CPS 1065822 00 000 00 0 13 1 1 4 68 0000000000 TCNDBX3 CPS 1065822 00 000 00 0 13 1 1 4 68 0000000000 TCFDBX3 CPS 1065822 00 000 O0 0 13 1 I 4 68 0000000000 TSCN BX3 CPS 1065822 00 000 O0 0 13 1 1 4 68 0000000000 TSCF BX3 CPS 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 INNDBX3 CPS 1065822 O0 000 O0 0 13 I 1 4 68 0000000000 INFD BX3 CPS 1065822 00 000 O0 0 13 1 1 4 68 0000000000 TENS BX3 LB 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 GR BX3 GAPI 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 CCL BX3 V 1065822 O0 000 O0 0 13 1 1 4 68 0000000000 ** DATA ** DEPT. 11800.000 SIGM. BX3 15.658 TPHI.BX3 15.317 SBHF. BX3 65.898 SBHN. BX3 89.643 SIGC. BX3 0.498 SIBH. BX3 125.956 TRAT. BX3 1.264 LCO1.BX3 1.625 SDSI.BX3 0.370 BACK. BX3 146.140 FBAC. BX3 38.320 TCAN. BX3 18589.406 TCAF. BX3 11439.775 TCND.BX3 12171.898 TCFD.BX3 4831.485 TSCN. BX3 3480.964 TSCF. BX3 2142.158 INND. BX3 2428.255 INFD.BX3 377.620 TENS.BX3 1490.000 GR.BX3 46.438 CCL.BX3 0.000 DEPT. 11481.500 SIGM. BX3 16.182 TPHI.BX3 25.120 SBHF. BX3 58.315 SBHN. BX3 82.894 SIGC. BX3 0.245 SIBH.BX3 124.164 TRAT. BX3 1.562 LCO1.BX3 2.062 SDSI.BX3 0.336 BACK. BX3 143.670 FBAC. BX3 27.668 TCAN. BX3 23611.953 TCAF. BX3 11452.963 TCND. BX3 14180.125 TCFD.BX3 5471.953 TSCN. BX3 4839.876 TSCF. BX3 2347.579 INND. BX3 2331.340 INFD.BX3 394.223 TENS.BX3 1465.000 GR.BX3 41.375 CCL.BX3 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : 001C01 DATE : 97/12/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-DEC-i997 13:53 PAGE: 55 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/12/30 ORIGIN : FLIC TAPE NAFIE : 97511 CONTINUATION # : 1 PREVIOUS TAPE : CO~NT : ARCO ALASKA INC, DS 18-11, PRUDHOE BAY, 50-029-21181-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/12/30 ORIGIN : FLIC REEL NAME : 97511 CONTINUATION # : PREVIOUS REEL : COherENT : ARCO ALASKA INC, DS 18-11, PRUDHOE BAY, 50-029-21181-00 LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO' ~SK~ ,i i.~NC i' I I I II '~l '0 ~'~i ~~ Well D.S. 18-11 ... ECC$3104 ,, PRUDHOE BAY Field County, State NORTH SLO...PE, ALAS.KA _ Date 9./12/87 DELIVERY DATE 9/17/87 Curve Name (Abbrev.) Standard Curve Name Logs Used _ _ CILD SP GR TEMP ,, CHT AC RFOC , , , RILM RILD FILES 1 & 2 Ohmmeter . J Millimho s/melter ~ Millivolts API for radiation deflectiol Fa~renhe it Pound force .. Microsecond per. foot Ohmmeter , , O~eter DIFL-AC Scale Date Page ! of~ 2 LIBRARY TAME. CURVE SPECIFICATIONS Company,, ARCO ALASKA ~ INC .... Well' D.S. 18-11 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date 9/12/87 DELIVERY DATE 9/17/87 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale i , i i. [, i .i , ,, i iiii i , i , , , FILES 3 & 4 . GR Gamma Ray CN- ZDL' CAL Caliper ,, SSD- ~Short Spaced' Counts ,,' HRDI': Hard 1 ,, - i i i -. , . ~ i' .:, ]~311, :,_ 3lIT Il , , ,.lin , [: Il I 'llJi ][' ~111 I [ I ,, HRD2 Hard 2 . .. " · . . SFT2 . Soft 2 " SHR SF-T2/HRD2 Ratio .,. --~ " LSN' Long Spaced Counts ,, SSN. Short spaced Counts " · . '.' , I I, lit , , , , , , ' , , I I I Il IIIl, I I CHT Cablehead Tension ,, _ TEMP Temperature " .. ZDEN ZDL Density ,, , , ,,, ,. o , , , , , ,,, jll ,pplll, ,iq ZCOR ZDL Correction ,, , , ,,,,l , i i i _ , , , i i , PE. Photo Electric X-section. ,, - .. i i , , i i i i ~ , ,,,, i i , ,,, i,., i i i Il CN Compensated Neutron Porositz ,, .. PO.RD ZDL Porosity .;, . . Company LIBRARY TAPE CURVE SPECIFICATIONS ARCO ALASKA, INC. Page 2 of 2 Well D.S. 18-11 ECC# 3104 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date. 9/12/87 DELIVERY DATE 9/17/87 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale GR Gamma Ray CN-ZDL ,,, , , , , , , , , , ,, , i , , , , , i , , ~ i i ill il il si 11 [ , ii i i ii , i ,, ,,, , , i , : :: , . ,, , ./,1,,~ ,, ,,! ,, , i ~, , ,, , , .. · , , ,, ,, ~ ,, , , ,l ,1 i , , 11 ,, , , · o · ** REEL HEADER ** R EEL NAME : DATE : ...... ORIGIN : FSYS SER'VICE NAME: BITL[S REEL CONTINUATION NUMBER: PREVIOUS REEL NAME : COMMENTS: DRESSER ATLAS LENGTH: 132 BYTES ** TAPE HEADER ** T/~PE NAME : DATE : ...... ORIGIN : FSYS SERVICE NAME: MAIN TAPE CONTINUATION NUMBER: PRE~IOUS TAPE NAME : COMMENTS: !LENGTH: 132 BYTES · ** FILE HEADER # :FILE NAME': MAIN SERVICE NAME: VERSION # : 1 DATE: 85/11/20 MAX RECORD LENGTH: FILE TYPE: LO PREVIOUS FILE NAME: .001 1024 ** INFORMATION RECORDS oi LIS C'USTO,MER Ol BYTES TAPE CREATED BY SDS PROGRAM' R 2.0 MNEM CONTENTS APIN : 50'02921 181 CN : ARCO .ALASKA, I:NC. WN : O.S. 18-11 FN : PRUOHOE BAY COUN : NORTH SLOPE' STAT : ALASKA LCC : 150.OO ** FORMAT ** UNITS ENTRY BLOCKS TYPE ENTRY m~em, mmmmm 8 60.0 9 .lIN 11 1.4 0 DATUM -0.500 DESCR IPT ION DEPTHS DECREASE FRAME SPACING FRAME SPACING UNITS MA;XIMUM FRAMES/RECORD TERMINATOR LEVEL SPACING SPECIFICATION BLOCKS SSN 68 LSN 68 GR 68 TTEN 68 T2R2 68 TlR2 68 ACQ 68 CN 68 4 I CPS CSSN 4 I CPS CLSN 4 I API CAL 4 I LBF SPD 4 I US T2R1 4 I US TlR1 4 I DIM AC 4 I ~- CNC ** FORMAT ** 68 68 68 68 68 68 68 4 4 4 4 4 4 4 1 1 1 1 1 1 1 1 CPS CPS IN F/MN us us US/F ENTRY BLOCKS TYPE ENTRY OESCRIPTION 4 I DEPTHS DECREASE 8 60.0 FRAME SPACING 9 .1'IN FRAME SPACING UNITS 11 14 MAXIMUM FRAMES/RECORD 0 TERMINATOR -0.500 LEVEL SPACING DATUM SPECIFICATION BLOCKS CURVE REPR NAME CODE SIZE SAMPLE UNITS iSSN 68 4 I CPS LSN 68 4 I CPS GR 68 4 I ,API ~TTEN 68 4 1 T2R2 68 4 I US TlR2 68 4 1 US ~CQ 68 4 I DIM CN 68 4 1 ** DATA ** CURVE NAME CSSN CLSN CAL SPO T2R1 TIRI AC ' CNG GEPTH 11'831.000 FT 3606.0960 M SSN 163.984 CSSN 163.984 LSN GR 83.008 CAL 6.740 TTEN i T2R2 434.~63 T2RI' ~05.125 TlR2 ACQ 0.000 AC 42.871 CN DEPTH 11800.000 FT 3596.6470 M SSN 205.691 CSSN 207.724 LSN GR 83.008 CAL ~,740 TTEN T2R2 453,313 T2R1 617,000 TlR2 ACQ 0.000 A:C 87.121 CN DEPTH 1.1700.000 FT 3566.167C M SSN 234.882 CSSN 261,885 LSN GR 33.408 GAL 6.694 TTEN T2R2 501'.063 T2R1 703~313 TlR2 ACQ 0.000 AC 108.407 CN RE CO PR ~8 68 68 68. ~8 68 68 4' 4 4 4 55.9.~4 2390.961 74.000 15.000 62.602 4278.398 621.313 32.341 77.145 4034.411 697.188 24.218 CLSN SPD TlR1 CNC SAMPLE 1 1 t .1 1 1 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC DEPTH 11600.000 ~FT 3535.687C M I SSN ' ' 1;5,905 ............ CSSN 2 6.390 LSN 56.504 CLSN UNITS CPS cps IN F/MN us us US/F 55.994 0.000 73.563 19.000 57,639 27.101 449.188 88.836 19.998 479.688 28.218 91.608 '6'000 DEPTH 11500.000 FT 3505.2070 M SSN 257.934 CSSN 244.429 GR 21.228 CAL 6.705 T2R2 497.250 T2R1 707.250 ACQ I .000 A'C 90.516 LSN TTEN TlR2 CN DEPTH 11400.00.0 FT 3474.7270 M SSN 289.832 CSSN 288.013 GR 19.489 CAL 6.699 T2R2 5t4.56~ T2R1 710.875 4CQ O.CO0 AC 103.096 LSN TTEN TlR2 CN DEPTH 11300-.000 FT 3444.2470 M SSN 395.392 CSSN 317.101 GR 21.839 CAL 6.720 T2R2 459.750 T2R1 639.250 ~ ACQ 0.000 ~C 87.882 LSN TTEN TlR2 CN DEPTH 11200.000 FT 34t3.7670- M SSN 282.440 CSSN 277,.063 GR 27.927 GAL 6.706 T2R2 595.375 T2R1 813.250 ~CQ 0.000 AC 116,142 LSN TTEN TlR2 CN DEPTH 11100.000 FT 3383.2870 M SSN 322.602 ~:,SSN 281-.410 GR 71.140 CAL 6.725 T2R2 519.563 T.2R1 699.500 ACQ O.GO0 AC 97.003 LSN TTEN TlR2 CN i DEPTH 11000.000 FT 3352.8070 M SSN 161.984 :GR 42.887 , T2R2 314.688 !ACQ O.CO0 DEPTH 10983.500 FT CSSN CAL T2R1 161,984 6.717 421.063 67.978 3347.7780 M SSN 161.984 CSSN GR 42.887 CAL , T2R2 314.688 T2R1 ;ACQ 0.000 AC LSN TTEN TlR2 CN 161.984 LSN 6.720 TTEN 421.063 TlR2 67.978 CN STAR~ING DEPTH =11831.000 FT ENOING DEPTH =10983.500 FT 3606.0960 M 3347.7780 M 94.019 CLSN 41.53.680 SPO 709.938 TlR1 26.258 CNC 122.834 CLSN 3933.988 SPD 706.313 TlR1 19.056 CNC 238.350 CLSN 4046.312 SPO 70-4.438 TlR1 12.809 CNC 112.885 CLSN 3'9-45.712 SPO 804.750 TlR1 18.955 CNC ~44.479 CLSN 4001.069 SPD 778.563 TlR1 · 19.473 CNC 52.995 CLSN 4025.598 SPO 44~.563 TlR1 25.466 CNC 52.995 CLSN 4025.598 SPD 440.563 TlR1 25.466 CNC 27.397 78.159 19.998 490.1'25 30.258 113.551 9.999 498.125 23.056 156.600 9.999 435.500 16.809 109.952 19.998 588.750 22. 955 109.054 14.999 492.625 23.473 52.995 14.999 275.000 29.466 52.995 14.999 275.000 29.466 ** FILE TRAILER ** FILE NAME: M~I'N .001 'SERVICE NAME: i VERSION # : 1 DATE: 85/11/ ~ MAXIMUM LENGTH: ,1024 , FILE TYPE: LO NE~XT FILE NAME: FILE NAME: REPT .00~' VERSION # = 1 DATE= 85/11/20 MAX RECORD LENGTH.' t024 FILE TYPE= LO PREVIOUS FILE NAME: ** INFORMATION RECORDS ** BYTES . MNEM CONTENTS mmmm mm.mmmmmmmmmmmmm APIN : 5002921181 CN : ARCO ALASKA, INC.. WN : D.S. 18-11 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA LCC : 150.00 ** FORMAT ** UNITS mmmmm ENTRY BLOCKS TYPE ENTRY 4 1 8 60.0 9 .lIN tt 14 0 -0.500 DATUM SPECI DESCRIPTION DEPTHS DECREASE F'RAME SPACING FRAME SPACING UNITS MAXIMUM FRAMES/RECORD TERMINATOR LEVEL SPACING FICATION BLOCKS CURVE REPR NAME CODE SIZE SAMPLE UNITS mmmm mlmm mmmmmm mmmmm SSN 68 4 I CPS ~LSN 68 4 I CPS ~GR 68 4 1 TTEN 68 4 I LBF 'T2R2 68 4 I US iTIR2 68 4 I US 'ACQ 68 4 I DIM ~'CN 68 4 1 ** FORMAT ** ENTRY BLOCKS ~ TY'PE ENTRY DESCRIPTION 4 I DEPTHS DECREASE 8 6~.0 FRAME SPACING 9 .lIN FRAME SPACING UNITS · 11 14 MAXIMUM FRAMES/RECORD 0 TERMINATOR -0.500 LEVEL SPACING DATUM SPECIFICATION BLOCKS CURVE NAME CSSN CLSN CAL SPD T2R1 TlR1 AC CNC REPR CODE ~8 58 68 68 68 SIZE 4 4 4 4 SAMPLE 1 1 1 1 1 1 1 1 UNITS CPS CPS IN F/MN US US/F ~NAME CODE SI: SAM -UNITS i :,SSN 68 4 1 CPS i LSN 68 4 t CPS GR 68 4 I API TTEN 68 4 I LSF T2R2 68 4 I US TlR2 '68 4 I US ACQ 68 4 I DIM CN 68 4 I -~ NA~M-E CSSN CLSN CAL SPD T2R1 TlR1 AC CNC 68 68 68 68 68 68 68 68 4 4 4 4 4 4 4 4 SAMPLE ~mm mm ~mm m em~ ~m 1 1 1 1 1 1 1 1 UNITS CPS CPS IN F/MN US US US/F ** DATA ** DEPTH 11825.000 FT 3604.2670 M SSN 276,972 CSSN 276.972 GR 79.549 CAL 6.671 T2R2 450.875 T2R1 '61 3.938 ACQ 0.~00 AC 40.871 L SN TTEN TlR2 CN 88.991 2781.322 74.000 15.000 CLSN SPO TlR1 CNC 88.991 0.000 73.563 lg.000 DEPTH 11800.000 FT 3596.6470 M SSN 271.921 C'SSN 275.946 GR 79.549 CAL 6.671 T2R2 450.563 T2R1 613.563 i ACQ 0.000 AC 85,569 LSN TTEN TlR2 CN 91.822 4166.633 602.938 ~5.774 CLSN SPD TlR1 CNC 88.991 19.998 423.688 29.774 DEPTH 11700.000 FT 3566.1670 M SSN 237.916 CSSN 275.586 GR 31.057 CAL 6.680 T2R2 506.563 T2R1 700.313 ACQ 0,000 A:C 1-09.576 LSN TTEN TI,.R2 CN 79.891 4053.696 694.81=3 '=22 · 028- CLSN SPD TlR1 CNC 98.859 19.998 484.625 26.028 DEPTH 11600.000 FT 3535.6870 M SSN 194.042 CSSN 252.021 GR 56.607 CAL 6.678 T2R2 428.938 T2R1 645.375 ACQ O.COO AC 77.241 DEPTH 1'1500.000 FT 3505.2070 M , SSN 258.8.15 GR 19.813 T2R2 503.750 'ACQ 0.00~0 DEPTH 11400.000 FrT ~ SSN 294.983 GR 18.570 T2R2 510.625 .ACQ O.CO0 CSSN 246.541 CAL 6.669 T2R1 710.125 AC 102.062 3474. 7270 M CSSN 287.795 CAL 6.674 T2R1 708.313 AC 104.313 LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TLR'2 CN 60.353 42t9.547 578.625 23.368 97.693 4166.703 707.563 25.251 126.561 4073.813 705.50C 18.552 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 87.054 19.998 410.375 27.368 81.079 19.998 481.813 29.251 115.708 12.999 505.250 22.552 DEPTH 11300.000 FT 3444.2470 M SSN 398.445 CSSN 31 8.794 GR 23.983 CAL 6.691 T2R2 458. 313 T2R1 640.8t3 ACQ 0.000 AC 86. 969 ; DEPTH 11200.C00 FT 3413.7670 M LSN TTEN TlR2 CN 235.001 4102.422 624.125 13.076 CLSN SPD TlR1 CNC 156.177 12.999 432.500 17.076 T2R2 A¢Q I .000 AC I 14. 224 DEPTH 11100'.(~00 FT 3383.28?0 M SSN 318.246 CSSN 277.031 GR 90.471 CAL 6.750 T2R2 488.813 T2R1 ACQ 0,000 AC 102.514 CN 19.874 LSN t,40. 389 TTEN 41!~26.422 ' TlR2 ~64.813 CN 1 ?. 793 DEPTH 11000.000 F,T 3352.807~ M · ,m~m~mm SSN 147.8/+2 CSSN 151.491 GR 43.083 CAL 6.714 T2R2 314.125 T2R1 459.375 ACQ 0.000 AC 59.650 LSN ]6.993 TTEN 3989.001 TlR2 411.000 CN 36.928 DEPTH 10961.500 FT 3341.072~ M _ SSN 14~0.986 CSSN 140.986 GR 40,121 GAL 6.718 T2R2 314.125 T2R1 45-9..37~ ACQ 0.000 AC 59.650 LSN 34.996 TTEN 3989.001 TlR2 411.000 CN 3'8.813 ,STARTING DEPTH ENDING DEPTH =11825.000, FT =10961.500 FT 3604.2670 M 334t.0720 M T 1'R1 ¢N¢ CLSN TlR1 CNC CLSN SPO TlR1 CNC CLSN SPO TlR1 CNC 572. 375 23.874 114.072 13.828 501.000 21.793 38.739 12. 999 317.625 40. 928 34.996 12.999 317.625 42.813 6 ** FILE TRAILER ** FILE NAME: REPT .002 SER¥ICE NAME: VERSION # : 1 D~TE: 85/11/ MAXIMUM LENGTH: 1024 FILE TYPE: LO NEXT FILE NAME: ** FILE HEADER # 3 ** FILE NAME: G/R .003 ~ SER¥ICE NAME: VERSION # : 1 "DATE: 85/11/20 MAX REC'ORD LENGTH: FILE TYPE: LO ~ PREVIOUS FILE NAME: 1024 BYTES ** IN-FORMATION RECORDS ** MNEM CONTENTS APIN : 5002921181 CN : ARCC ALASKA, WN : D.S. 18-11 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT :.A.LASKA LCC : 150.00 INC. ** FORMAT ** UNITS mmmmm ENTRY BLOCKS 4 1 DEPTHS DECREASE 8 60.0 FRAME SPACING 9 .lIN FRAME SPACING UN[TS 11 14 MAXIMUM FRAMES/RECORD 0 TERMINATOR -0.500 LEVEL SPACING DATUM SPECIFICATION- BLOCKS CURVE REPR NAME CODE SIZE SAMPLE UNITS SSN 68 4 I CPS LSN 68 4 I CPS GR 68 4 I API TTEN. 68 4 I LBF T2R2 68 4 I US TlR2 68 4 I US ACQ 68 4 I DIM 'CN 68 4 I % ** FORMAT ** ENTRY BLOCKS TYPE ENTRY DESCRIPTION 4 I DEPTHS DECREASE 8 60.0 FRAME SPACING 9 .lIN ERAME SPACING UNITS 1t 14 M.A!XIM~RAMES/RECO~D 0 TERN'INATOR -0.500 LEVEL SPACING DATUM SPECIFICATION BLOCKS' CURVE REPR ~ NA'ME CODE SIZE SAMPLE UNITS SSN 68 4 I CPS LSN 68 4 I CPS GR 68 4 I API TTEN 68 4 I L~F ~T2R2 68 4 I US ~TIR2 68 4 I US ACQ 68 4 I DIM CN 68 4 I .% J ** DATA ** DEPTH 11000.000 FT 3352.8070 M SSN 147.768 CSSN' 150,194 GR 55.262 CA.L 6,704 T2R2 261.313 T2R1 419.875 ~ ACQ 0.000 AC 79.180 DEPTH 10900.C00 FT 3322.327C M "SSN 135.929 CSSN 132.520 GR 78.682 CAL 6,700 T2R2 261.313 T2R1 419.875 CURVE NAME CSSN CLSN CAL SPD T2R1 TIR1 AC CNC CURVE NAME CSSN CLSN CAL SPD T2R1 TlR1 AC CNC LSN T TEN TlR2 CN LSN TTEN TlR2 REPR CODE · Jm, J'J' mm, ,J,m , 68 68 68 68 68 68 68 68 SIZE 4 4 4 4 4 4 4 REPR CODE 68 ~8 ~8 68 68 ~8 ~8 68 SIZE 4 4 4 4 4 4 4 4 36.673 3946.078 409.00C 33.892 26.907 3977.704 409.00C S A MPL E 1 1 1 1 1 1 1 1 SAMPLE 1 1 1 t 1 1 1 1 CLSN SPD TlR1 CNC CLSN SPD TlR1 UNITS CPS IN F/MN US US US/F UNITS CPS CPS IN F/MN us us US/F % 40.568 26.009 250.813 37.892 27.634 25.997 250.813 0 00- 000 ?o SSN 129.714 CSSN 136,894 GR 69,1 29 (;AL 6.7{]0 72R2 261.313 T2R1 419,875 ACQ 0.000 AC 79,180 DEPTH 10700.C00 FT 3261.367(] M SSN 113,504 C. SSN 117,986 GR 61.445 (;AL 6,.695 : 72R2 ,261.313 T2R1 419,875 i ACQ 0,(300 AC 79.180 DEPTH 10600.000 FT 3230.8860 M SSN 119.861 C'SSN 126..044 GR 100.'518 C~L 6,677 72R2 261.313 T2R1~ 419,~75 ACQ 0,000 AC 79.180 I DEPTH 10500.{]00 FT 3200.4060 M SSN 130.433 CSSN 133,743 GR 107.953 CAL 6,6~0 72R2 261.313 T2R1 419.875 ACQ 0.000 AC 79,180 ~ DEPTH 10400.000 FT 3169,927~ M ~mmmmmmmmmmmmmmmmm~mm!m mm'mem e ! m CSSN 132,991 CAL 6,696 ~2,R t~ ~ '4-t-9,875.. AC 79. 180 i SSN 129.847 ~ GR 91,874 72R2 261 ,;3'1 ~ ~ ~CQ 0.000 ! OEPT~H 10300.000 FT 313'9.4460 M SSN ' 15 .967 CSSN 147 ~ GR 71,863 CAL 6 72R2 261.313 T2R1 .419 ~CQ 0.000 'AC 79 .3B8 .710 .875 ,180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN T1.R2 CN LSN 'TTEN TlR2 CN 25.293 3956.688 40g.ooc 48.028 1 g. 770 393g,393 ~og.o00 73.956 22.414 3891 · 57~: 409.000 '50,955 29.510 3904.32? 409,000 55.351 27.430 3840.184 '40g .000- 73,691 33.017 3834.869 40g.o00 53.74~ CLSN SPD TlR1 CNC CLSN SPD TlR1 CN¢ CLSN SPD TlR1 ¢N¢ CLSN SPD TlR1 CNC CLSN SPD - . T 1 R 1: CNC CLSN SPD TlR1 CNC 30.230 26.991 250,813 52.0~8 21.542 26.997 250.813 77,956 27.217 63.326 250.813 54.955 27.294 63.12~ 250.813 59.351 24,124 65.102 z50,813 77.691 30.468 59.291 250.813 57.746 ~ DEPTH 1020,0.0{]0 FT 3108.9660 M I IIII I II II III IImI II m I I~ II I I II I 'SSN 141,278 CSSN 141 GR 79.482 CAL 6 72R2 261.313 T2R1 419 ~CQ 0.000 AC 79 DEPTH 10100.000 FT 3078.4860 M I I IIII I t III I I I I I I I I II I ~ . SSN 143.603 C$SN 136 GR 101,534 CAt. 6 72R2 261.313 T2R1 419 ACQ 0.000 AC 79 :DEPTH 10000.000 FT 3048.0060 M IIIImiIIIIiiiiIIiimmIiImIIIiII ~ SSN 136.547 CSSN 132 i GR 118.771 CAL 6 72R2 261.313 T2R1 419 ACQ 0.000 AC 79 I DEPTH 9900.000 PT 3017,5260 M ,916 .704 .875 .180 ,183 .704 .875 .180 ,B65 .698 .875 .180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN 27.814 377g,.083 409.000 61.904 3t .807 . 3725,918 409.000 47.733 27.292. 369g.112 4(]9 50.194 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPO TlR1 CNC 27,557 59.994 250.813 65.904 30.193 59.82~ 250.813 51.733 28.707 61.406 250.813 54.194 GR 12-2.998 CAlL ':~ -6' 7'0~: TTEN T2R2 261.31 3 T2R1 41 9.875 TlR2 ACQ 0.000 AC 79.180 CN DEPTH 9800.000 FT 2987.046C M · ~ SSN 131.148 ¢SSN 132.420 LSN GR 105'835 (;AL 6.733 TTEN ~ T2R2 261.313 T2R1 419.875 TlR2 ACQ 0.000 AC 79.180 CN DEPTH 9700.000 FT 2956.5660 M ' SSN 143.829 CSSN 136.444 LSN - GR 113.880 CAL 6.717 TTEN 'T2R2 261.313 T2R1 419.875 TlR2 ACQ 0.000 AC 79.180 CN ~ DEPTH 9600.000 FT 2926.0860 M SSN 132.856 CSSN 140.682 ~ GR 54.080 CAL 6.712 T2R2 261.313 T2R1 419.875 ACQ O.CO0 AC 79.180 LSN TTEN TlR2 CN SSN T2R2 ACQ DEPTH DEPTH 9500.000 FY 2895. 6060 M 137.013 CSSN 136.617 58.465 CAL 6.697 261.313 T2R1 419.875 0.000 AC 79.180 9400.000 't:T ~T28-65.~1260 M i SSN 137.943 cSSN 137.387 ~GR 57.824 CAL 6,703 T2R2 261.313' T2R1 419.875 ACQ 0.000 AC 79.180 DEPTH 9300.000 FT 2834.6460 M SSN GR T2R2 ACQ DEPTH LSN TTEN TlR2 CN LSN TTEN TlR2 CN 144.985 CSSN 148.919 LSN 53.324 CAL 6.697 TTEN 261.313 T2E1 419.875 TlR2 0,000 AC 79.t80 CN 9200.000 FT 2804' 1660 M SSN 155.331 CSSN 153.377 LSN GR 52.037 CAL 6.699 TTEN T2R2 261.313 T2R1. 419.875 TlR2 ACQ 0.000 AC 79.180 CN DEPTH 9100.000 FT 2773.6860 M SSN 141.715 CSSN 138.682 LSN GR 52.643 CAL 6.705 TTEN T2R2 261.313 T2R1 41:9.875 TlR2 ACQ 0.000 AC 79.180 CN DEPTH 9000.000 FT '2743.2060 M SSN 143;065 cSsN 147,427 GR 59.609 CAL 6.6'96 LSN TTEN -- 409.000 64.439 23.879 3603.061 409.000 58.385 26.025 3610.194 409.000 60.972 26.322 3527.971 409.000 47.659 31.458 3475.911 ~+og.o00 39.737 32.935 3507.861 409.000 45.641 31.879 3437.561 409.000 46.471 43.285 3386.636 409.000 44.985 34.009 3396.956 409.000 57.633 29.336 3379.874 ,SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPO TlR1 CNC CLSN SPD TlR1 CNC CLSN SPO TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD 250.813 68.439 26.397 60.544 250.813 62.385 26.736 60.691 250.813 64.972 31.245 63.005 250.813 51.659 33.599 62.000 250.813 43.737 31.088 62.661 250.813 49.641 33.518 62.758 250.813 50.471 34.892 62.224 250-813 48.985 28.008 63.994 250.813 61.633 32.736 63.573 DEPTH 8900.000 FT 2712.7260 M m ,mmm m m mm mmmm m m mm m m m mm m.m ~mlm m mmm m m mm m m m m m SSN 142.856 CSSN .147 GR.- 5?.928 (;AL 6 T2R2 26.1.313 T2R1 419 : ACQ O.O00 AC 79 .730 .699 .875 .180 DEPTH 8800.000 FT 2682.245C M immmmmmmmmmmmmmmmmmmmmmmmmmmmm SSN 136.532 CSSN 129 GR 82.532 CAL 6 T2R2 261.313 T2R1 419 ACQ 0.000 AC 79 .928 .693 .875 .180 DEPTH 8700.000 FT 2651.7650 M mmmmmmmmmmmmmmmmmmmmmmmmmmmmmm SSN 145.498 CSSN 145 GR 75..556 CAL 6 T2R2 261.3t3 T2RI 419 ACQ 0.000 AC 79 .658 .703 .875 .180 DEPTH 8600.000 FT 2621.2850 M ~ SSN 140.763 CSSN 140.541 i GR 66.164 CAL 6.694 I T2R2 261.313 T2R1 419.875 - ACQ 0.000 AC 79.180 DEPTH 8500.000 FT 2590. 8050 M SSN I 42. 639 SSN 1 41 .044 GR 56.7'55 C ~-.-i~ -6.700 T2R2 261.313 T2R1 41 9.875 /~CQ O. 000 AC 79. 180 l DEPTH~ 8400.000 FT 2560.325~ M - S, 33. CSSN 131.332 i GR 67.919 CAL 6.708 T2R2 261.313 T2R1 41:9.875 ACQ 0.000 AC 79.180 DEPTH 8300.000 FT 2529.845C M mmmlmm ~ SSN~ 134.595 CSSN 147.695 GR 54.835 CAL 6.695 ~ T2R2 261.313 T2R1 419.875 ACQ 0.000 AC 79.180 DEPTH 8200.~00 FT 2499.3650 M SSN 145.417 CSSN 144 ~ GR 50.620 CAL 6 ! T2R2 261.313 T2R1 419 ACQ 0.000 AC 79 DEPTH 8100.000 FT 2.468.885C M ~, SSN 155.929 CSSN 156 ~ GR 48,134 CAL 6 ~ T2R2 261'.313 T2R1 419 ~ ACQ 0.000 AC 79 .423 .71.1 .875 .t80 .969 .701 .875 .180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN 34.324 3320.861 409.000 51.823 28.293 3-28t .8.ac ~og.o00 57.582 31.521 3267.830 409.000 40.545 33.543 3210.447 40g.ooo 40.048 32.060 3.1.85.134 40g. O00 51.974 31.788 3101.428 4.09.000 48.150 33.196 3106.530 409.000 42.835 33.670 3074.385 409.000 45.467 40.21{5 3052.411 409.000 43.545 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 31.178 59.444 250.813 55.823 26.171 59.741 250.813 61.582 35.540 61.322 250.813 44.545 34.165 60.246 250.813 44.048 29.971 61.176 250.813 55.974 28.828 61.303 250.813 52.150 34.594 60.920 250.813 46.835 32.668 61.938 250.813 49.467 35.322 62.038 250.813 47.545 10 GR 38.894 (;AL 6.?20 T2R2 26t-313 T2R1 419.875 ACQ 0-000 AC 79. 180 TlR2 409.000 CN 43.145 CLSN SPD TlR1 CNC 30.272 61.706 250.813 47.145 DEPTH 7900.(]00 FT 2407.9250 M SSN GR T2R2 i : i DEPTH 134.448 CSSN 48.619 CAL 261.313 TZR1 0.000 AC 7soo.oo0 FT Z i SSN 1:97.751 CS "GR 39.110 CA TZR2 261.313 T2 'ACQ 0.000 AC .144.16i 6.717 419.875 79.180 377-4450 M SN 164. 247 L 6.722 R1 41.9.875 79.180 LSN 28.960 TTEN 297t .534 TlR2 40<).000 CN 43.628 LSN 64.442 TT'E.N 2946.479 TlR2 409.000 CN :37 · 930 CLSN SPD TlR1 C NC CL SN SPD TlR1 CNC 33.227 61.344 250.813 47.628 /+1.303 63.766 250.813 41.930 ,DEPTH 7700.000 FT 234:6.9650 M SSN 130.423 CSSN: 131.472 ;GE 57,785 CA:L ~ 6.722 T2R2 261.313 T2R1 419.875 A-CQ 0.000 AC 79.180 LSN '27,936' TTEN 2906.371 TlR2 409.000 CN 59.176 CLSN SPO TlR1 CNC 26.046 63.114 250.813 63.176 DEPTH 7600,000 FT 2316.4.850 SSN GR T2R2 ACQ DEPTH 152.075 CSSN 1:48.731 42.362 CAL ' 6.725 261.313 T2R1 419.875 0.000 AC 79.180 7500.000 FT 2286.0050 M ;~ SSN GR ~T2R2 ~ACQ ~DEPTH ~ mmmmmmm ~mmwwmmwmm w mmwmmm 1.52,802 CSSN 138.233 58'222 CAL 6.707 261.313 T2R1 419.875 0.000 AC 79.180 LSN 34.486 TTEN 2910.377 TlR2 409.000 CN 42.256 LSN 41.569 TTEN 2830.772 TlR2 409.000 CN 46.442 7400.000 FT 2255.5250 M ~ SSN 135.878 CSSN 148.499 LSN 29.779 ~ GR 4~.401 CAL 6.709 TTEN 2812.479 ~ T2R2. 261.313 T2R1 419.875 TlR2 409.00'0 I ACQ 0.000 AC 79.180 CN 39.670 ~ DEPTH 7300.000 FT 2225.0440 M SSN ~134.822 CSSN 142.933 LSN 26.246 ~ GR 28,979 CAL 6.723 TTEN 2787.369 T2R2 261 .~13 T2R1 419.875 TlR2 409.000 ~ ACQ 0.000 AC 79.180 CN 43.751 . DEPTH 7200.000 FT 2194. 5640 M ; SSN 150.564 CSSN 1'52.144 ~ GR 43.625 CAL 6.740 T2R2 261.313 T2'R1 419.8'75 ~ ACQ 0.000 AC 79.180 "DEPTH 7100.000 FT 2164.084C M ~ SSN 151.865 CSSN 148.442 LSN 35.059 TTEN 2776.746 TIR2 409.000 CN 38.364 LSN 34.953 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CLSN 35.410 63.685 250.813 30.983 63.661 250.813 50.442 36.669 63.453 250.813 43.670 32.744 64.579 250.813 47.751 38.109 65.150 250.813 42.364 32.592 · · AC, Q ' O:,:0~0 AC" 79'~-180-.' CN' 49. 438:" ¢N¢ 12 DEPTH 7000.000 FT 2133.6040 M SSN 137.369 CSSN t44.5.58 LSN GE 22.645 CAL 6.727 TTEN T2~2 261.313 T2R1 419.875 TlR2 ~CQ 0,000 AC 79,180 CN 27.30-9 CLSN 2624.~56 SPD 409.00C TlR1 48.949 ¢N¢ 31.319 64.847 250.813 52.949 DEPTH 6900.000 FT 2103.1240 M SSN 157.915 CSSN 145.510 LSN GR 31'.466 CAL 6,730 TTEN T2R2 261.3t3 T2R1 419.875 TlR2 ACQ O.000 AC 79.180 CN 35.33a CLSN 2671.8~6 SPD 4~.09.000 T-1R1 51.723 CNC 30.872 64.577 250,813 55.723 DEPTH 6500.000 FT 20~2,6440 M SSN 11t,743 CSSN 114.128 LSN GR 44. 251 CAL 6.727 TT'EN T2R2 261..313 T2R1 419.875 TlR2 ACQ 0,000' AC 79.180 CN 22.527 CLSN 2579.754 SPD ~:O9.000- TlR1 82.!'61- CNC 19.817 66.337 2.50.81 3 86.161 DEPTH 6700.~00 FT 2042.164~ M mmmmmmmmmmmm.mmmmmmmmmmmmmmmmmm SSN 132,904 CSSN 120.464 LSN GR 43.706 CAL '6.713 TTEN T2R2 261.31 3 T2~1 419.875 T1 R2 ~¢Q 0.000 ~C 79.180 CN 25.407 CLSN 25..25.437 SPD 409.000 TlR1 60.488 CNC 23.628 66.587 250.813 64.488 DEPTH 6600.000 FT 2011.6840 M SSN 146.440 CSSN 12B~6.2i LSN GE 50.747 CAL 6.745 TTEN 72R2 261,313 T2R1 4~.9.875 TlR2 ACQ O,, 000 AC 79. 180 CN i DEPTH 6500.000 FT 1981.2040 M SSN 144. 204 CSSN 140,274 LSN GR 37.094. CAL 6.734 TTEN T2R2 261.313 T2R! 419.875 TlR2 ACQ 0.000 AC 79,180 CN '33-497- CLSN 2496.378 SPD 409.000 TlR1 43. 496 CNC 32.951 -CLSN 2524.324 SPD 409.000 TlR1 55,443 CNC 30.329 66.023 250.813 47.496 28.822 65.823 250.813 59.443 DEPTH 6400.000 FT 1950.7240 M ~mmmmmmmm~mmmm~ mmmmmmmm SSN 134.154 ¢SSN 137.448 LSN ~ GR 33.978 CAL 6.732 TTEN T2R2 261,313 T2R? 4!9.875 TlR2 ACQ 0,C00 AC 79.180 CN "DEPTH 6300.000 FT 1920,2440 M SSN 120.989 CSSN 123,270 GR 47.819 CAL 6.736 T2R2 261.313 T2R.I 419.875 ACQ 0.000 A'C 79.180 LSN TTEN TlR2 CN 31.000 CLSN 2542.401 SPD 409.000 TlR1 44.899 CNC 23.696 CLSN 2491.984 SPD 4Og.00O TlR1 55.573 CNC 31.637 67.229 250.813 48.899 25.291 67.164 250.813 59.573 DEPTH 6200.000 FT 1889.764C M m mm m ~mm m m m m ~m~. m m m mm -mm am .~ m m m m ~m m m m m m e mm m SSN 112.773 CSSN 114.857 GR 50.470 CAL 6.736 T2R2 261,313 T2R1 419,875 /~C'Q 0,000 AC 79.180 ,LSN TTEN TlR2 CN 22.673 CLSN 2460.919 SPD 409.00~ TlR1 68.029 CNC 21.846 67.490 250.813 72.029 SSN 129.364 CSSN 112.782 GR 24.4.57 gAL 6.730 72R2 261.313 T2R1 419.875 ACQ 0.000 AC 79.180 LSN TTrEN TlR2 CN .. 24.070 2/~47. 190 409.000 61.565 CLSN SPD TlR1 CNC 22.487 67.1 81 250.813 65.565 13' DEPTH 6000.000 FT 1828.8040 M ,mmm, ,mm, *m,, .,,mm, ,,mm, ,,m~ .,mmm ~,m m,mm, ,mmm ..'~,m ~m. ,mmm, ,mm, .,mmm .~mm ,~m, *,mm,, .,,,mm, ~mm. ,m~ ,,m wmm,~. ,mm,mm m SSN 127. 279 CSSN 11'8. 849 GR 34.024 CAL 6.7'5'2 72R2 261.313 T2R1 419,875 ACQ 0.000 AC 79.180 DEPTH 5900.(]00 FT 1798.3240 M SSN 129.629 CSSN I 22.425 GR 60.925 CAL 6.730 72R2 261.313 T2R1 419.875 /~CQ 0.000 AC 79.180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN 25 · g05 2395.821 409.000 56.644 27.508 2377.981 409.000 6-9.084 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 23.977 67.652 250.813 60.644 22.430 68.731 250.813 73.084 DEPTH 5800.000 FT 1767.8440 M SSN 121.276 CSSN 1 23.763 i GR 64.258 CAL 6.742 72R2 261 . 31 3 T2R1 41 9.875 ACQ 0.000 AC 79. 180 DEPTH 5700.000 FT 1 SSN 140.926 CS GR 41.810 CA 72R2 261.313 72 A CQ 0. CO0 AC 737. 3640 M SN 105.250 L 6.737 R1 419.875 79,180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN 24.216 2406.793 409.000 62.378 25.357 2375.214 ~,o9.ooo to-3.6 56i CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 24.078 69.329 250.813 66.378 17.~50 68.855 250.813 107.656 DEPTH 5.600.000 FT 1706.884C M mmmmmmmmmmmmmmmm~mmm.mmmmmmmmmm i SSN 1'38.211 CSSN 144.320 "GR 37.853 CAL 6.740 ~ 72R2 261 . 313 T2R1 419 . 875 i ACQ O.CO0 AC 79.180 LSN TTEN TlR2 CN 28.667 2315.423 4C9.000 72.592 CLSN SPD TlR1 CNC 26.126 68.980 250.813 76.592 DEPTH 5500.000 FT 1676.403(; M m ~mm m ~m m ~mm m m m m ,mm m m ~mm ~mmm~ m m m m ,mm~ m m m m m m m m m m SSN 122.418 CSSN 136.715 GR t9.571 CAL 6.746 72R2 26t .313 T2R1 419.875 ~CQ 0.000 AC 79.180 LSN TTEN TlR2 CN 23.961 2314.356 ~Og. O00 57.929 CLSN SPD TlR1 CNC 27.320 69.647 250.813 61.929 ~ DEPTH 5400.000 FT 1645.9230 M ~ SSN 142.759 CSSN 146.479 GR 32.828 CAL 6.738 72R2 261.313 T2R1 419.875 ACQ 0.000 AC 79.180 DEPTH 5300.000 FT 1615.4430 M ~ SSN 122.223 CSSN 114.440 GR 47.603 CAL 6.746 ~ 72R2 261.313 T2R1 419.875 ~' ACQ 0.000 AC 79.180 ~DEPTH 5200.000 FT .1584.963C LSN TTEN TlR2 CN LSN TTEN TlR2 CN 30.977 2299.642 409.000 62.103 22.739 2224.310 409.000 63.963 CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 28.301 70.337 250.813 66.103 22.209 70.391 250.813 67.963 i ACQ 0.000 AC 4 i' 9:~' 8:~'5 79.180 : DEPTH 5100.000 FT 1554.4830 M · SSN 130.591 C$SN 124.351 GR 43.651 CAL 6.739 T2R2 261.31,3 T2R1 419,875 ACQ O.CO0 AC . 79.180 TlR2 CN LSN TTEN TlR2 CN 58.919 24.649 2?23.599 409.000 60.410 TtR1 CNC CLSN SPD TlR1 CNC 62.919 24.372 70,016 250.81'3 64.410 DEPTH 5000.000 FT 1524,0030- M SSN 120,875 CSSN 133.176 : GR 47.382 CAI. 6.741 , T2R2 261.313 T'2R 1' 419.875 · ACQ 0..000 AC 79.180 LSN TTEN TlR2 CN 21.400 2096.813 409.000 53.744 CLSN SPD TlR1 CNC 27.540 66.970 250.813 57.744 DEPTH 4900.000 FT 1493.5230 M SSN 140.42,3 CSSN 144.281 GR 27.944 CAL 6.754 T2R2 261.313 T2R1 419.875 ~CQ 0.000 AC 79.180 LSN TTEN TlR2 CN 29.470 206'9.37O ~09.000 54.522' CL SN SPD TlR1 CNC 30.126 64.793 250.813 58.522 OEPTH 4800.000 FT 1463.0430 M $SN 122~248 CSSN 120.800 GR 55.470 CAL 6.751 T2R2 261.313 T2R1 41,9.875 ACQ. 0.000 AC 79.180 LSN TTEN TlR2 CN 22.408 2032.65~ 4.09. 000 52.684 CLSN SPD TlR1 CNC 25. 579 65.944 250.813 56.684 OEPTH 4700.000 FT 1432.5630 M SSN 143.213 CSSN 138.198 GR 53.69'7 CAL 6.753 T2R2 2'61.313 T2R1 419.875 ACQ 0.000 AC 79.180 LSN TTEN TlR2 CN / 23.039 2[~13.681 409.000 58.048 CLSN SPD TlR1 CNC 27.602 65.702 250.813 62.048 DEPTH 4600.C00 FT 1402.0830 M SSN 135.751 CSSN 129.261 GR 37.268 CAL 6.748 T2R2 261.313 T2R1 419.875 ACQ 0.000 A-C . 79.180 LSN TTEN TlR2 CN 24.488 2041.399 409.000 70.515 CLSN SPD TlR1 CNC 23.682 65.823 250.81'3 74.515 DEPTH 4500.000 FT 1.371.6030 M / SSN 140.827 CSSN 143.117 GR 2'6.770 CAL 6.747 T2R2 261 .31 3 T2R1 419.8,75 4CQ 0.000 AC 79.180 LSN TTEN TlR2 CN 27.954 2018.895 409.000 44.232 CLSN SPD TlR1 CNC 33.258 65.720' 250.813 48.2~2 DEPTH 4400.000 FT 1 ~ SSN 134.747 CS "GR 56.878 CA T2R2 261.313 T2 ACQ 0.000 AC 341.1230 M SN 126.275 L 6.748 R1 419.875 79.180 : DEPTH 4300.000 FT 1310.6430 M m IIm m m m m t lmm am m m m m ammm. m imm .llmm m m.mm m / m m.~mm mm mm m SSN 107.812 CSSN 105.749 GR 47,094 CAL 6.739 T2R2 261.3~t3 T2R1 4.19.875 LSN TTEN TlR2 CN LSN TTEN TlR2 25.646 1971.092 409.000 51.484 lg.617 1955.724 409.000 CLSN SPO TlR1 CNC CLSN SPD TlR1 26.845 65.861 250.813 55.484 16.848 67.247 250.813 DEPTH 4200" 000 FT 1 SSN I 32.134 CSSN I 28.463 LSN GR 32.863 CAt. 6.762 TTEN T2R2 261.313 T2R1 419.875 TlR2 ACQ 0.000 AC 79.180' 6N DEPTH 4100.000 FT 1249.6830 M SSN 106.590 CSSN 105.252 LSN : GR 38.899 CAL 6.798 TTEN '. T2R2 26t'313 T2R1 419.875 TlR2 i ACQ O.CO0 AC 79.180 CN , DEPTH 40(]0'000 FT 1219.2020 M SSN 129.588 CSSN 131.103 LSN ~ GR 34.916 CAL 6.776 TTEN T2R2 261.313 T2R1 419.875 TlR2 i ACQ 0.000 AC 79.1 80 CN G T ~S 'G DEPTH 3900.000 FT 1188.7220 M SSN 108.271 CS.SN 109..98i R 61.357 CAL 6.767 2R2 261.313 T2R1 419.875 CQ O.O00 AC 79.180 EPTH 38,00.000 FT 1158.2420 M SN 118.471 CSSN 113.333 R 3'9. 100 CAL 6.81 8 2R2 261.313 T2R1 4!9.875 CQ 0.000 AC 79.180 DEPTH 3700. SSN 117 GR 45 T2R2 261 ACQ 0 DEPTH 3600. CCC) FT 11!27.7620 M · 313 CSS'N 129.029 · 306 CAL 6.827 .313 T2R1 419.875 .COO AC 79.180 000 FT 1097. 2820 M ~' SSN 106.437 CSSN 101.419 ~ GR 46.953 CAL 6.850 T2R2 261.313 T2RI 419.875 ACQ 0.000 AC 79.180 DEPTH 3500.000 FT 1066.8020 M ~ SSN 1'13.490 CSSN 136.839 ~ GR' 43.524 CAL 7.313- T2R2 261.313 T2R1 419.875 ~CQ O.CO0 AC 79.180 ~ DEPTH 3400.C00 FT 1036.3220 M "SSN 105.552 C. SSN 101.~02 GR 32.840 CAL 8.204 ~ T2R2 261.313 T2R1 4t9.8'75 ~ACQ O.CO0 AC 79.180 ~DEPTH 3300.000 FT 1005.842~ M LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN 28.352 1948.418 409.000 49.781 23.009 I 93.5.678 409.000 67.89<] 27.922 1928.138 409.000 47.4'27 20.231 1870.809 4O9.000 76.915 23.672 1851.667 4~09,'000 72.265 18.618 1835.460 409.000 76.636 19.826 1799.413 409.00¢ 65.431 20.533 1755.701 409.000 59.539 ,18.619 1691.208 409.0~0 101.414 CLSN SPD TlR1 CNC CL S.N SPO TlR1 CNC CLSN SPD T1 R1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPO TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 28.290 66.713 250.813 53.781 19.977 66.782 250.813 71.899 28.903 67.320 250.813 51.427 19.790 66.496 250.813 80.915 20.685 68.573 250.813 76.265 23.008 68.526 250.813 80.636 19.383 67.853 250.813 69.431 27.097 67.779 250.813 63.539 16.816 68.102 250.813 105.414 GR 45.835 C'4tL ' ' ' '8:~::20'8 ~ T2R2 261 .313 T2R1 419.875 ~CQ 0.000 AC 79.1'80 DEPTH 3'200.000 FT 975.3621 M ~ S N 104,571 CSS 11'3.128 GR 31'.495 CA.L '8.221 ~T2R2 261-~.313 T2-R1 419.875 ~ ACQ 0.000 AC 79.180 ~ DEPTH 3100.000 FT 944.8818 M ~ SSN 104.495 CSSN 107.549 ': GR 43.431 C/IL 8.273 T2R2 261 .313 T2R1 419.875 ~' ACQ 0.000 AC 79.180 DEPTH 3000.000 FT 914.4019 .M $SN 103,758 ¢SSN 105.523 GR 43.988 CAL 8.296 T2R2 261,313 T2R1 419.875 /~CQ 0.000 AC 79.180 TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN LSN TTEN TlR2 CN t'~?'01 · 2 409.000 123.344 20.340 1657.311 409.000 53.252 23.249 1606.939 409.000 67.877 lg.124 1550.972 409.000 59.714 SP-D TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC 250.813 127.344 23.434 70.090 250.813 57.252 20.271 69.284 250.813 71.877 20.929 69.446 250.813 63.714 16 SSN GR 'T2R2 i~CO DEPTH 2gOO.C00 FT 883.9219 M mmmmmmmmmmmm-mmmmmmmmmmm~mmmmm 108.3.88 CSSN 107.407 30.904 C.AL 8.292 261,313 T2R1 41~.87'5 0.000 AC 79.180 DEPTH 2800'000 FT 853-4417)!::M mmmmmmmmmmmm m m~m SSN 1t3.207 CSSN 117.257 GR 17.380 CAL 8.266 T2R2 261.313 T2RI' 419.875 AC:Q 0.000 AC 79'180 LSN TTEN TlR2 CN LSN TTEN TlR2 CN 18,942 1535.098 409.000 62.013 1514.245 409.000 71.493 CLSN SPO TlR1 CNC CLSN SPD TlR1 CNC 21.131 6g .235 250.813 66.013 21,499 69.793 250.813 75.493 DEPTH 2700.000 FT 822-9617 M SSN t08.919 CSSN 1113.304 i, GR 33.243 GAL 8,296 -- T.2R2 261.313 T2R1 419,875 :~ ~CQ 0,000 AC 79.180 LSN TTEN TI:R2 CN 21.393 1483.676 409.000 83.688 CLSN SPD TlR1 CNC 19.560 70.993 250.813 87.688 DEPTH 2600.000 FT 792.4817 SSN 116.278 CSSN GR 34.694 CAL T2R2 261.313 T2RI' ACQ 0.000 AC 116.67'4 8,290 419.875 79.180 SSN GR T2R2 AC.Q DEPTH & DEPTH 2500.000 FT 762.0015 111,539 CSSN 31.954 CAL 261.313 T2R1 0,000 AC 113.851 8.306 419.875 79.180 2427.500 FT 739· 9036 M ~.mmmmmmmmmmmmm. mmmmmmmmmmmmm~mmm SSN 101.990. CSSN i) G~ 26.978 CAL 101.990 8.324 LSN TTEN T 1.R 2 C-N LSN TTEN T!: R2 CN LSN TTEN 21..240 1"457.339 409.000 75.977 21.352' 1440.700 409.000 85.179 18.998 1451.655 . _ - CLSN SPD TlR1 CNC CLSN SPD TlR1 CNC CLSN SPO 20.933 70.882 250.813 79.977 19.613 70.638 250.813 89.179 18.998 71.993 STARTING DEPTH =11067.000 FT 33?3.2290 M ENDING DEPTH = 24'27.500 FT 739.9036 M , ** FILE TRAILER ! FILE NAME: 'G/R SERVICE NAME': ~ VERSION # : 1 DATE: 85/11/ MAXIMUM LENGTH- FILE TYPE: LO NEXT FILE NAME- .003 1024 ** TAPE TRAILER ** :TAPE NAME: : SERVICE NAME: G/R DATE: ...... ' ORIGIN OF DATA: FSYS TAPE CONTINUATION # NEXT TAPE NAME: ii COMMENTS: : 01 ** REEL TRAILER ** REEL NAME: SERVICE NAME: BITLIS DATE : ...... ORIGIN OF DATA~ FSYS REEL CONTINUATION # NEXT REEL NAME: COMMENTS: DRESSER REEL HEADER - TAPE ~E/~DER - FILE HEADER - INFORMATION - FORMAT - O/~TA - TABLE DUMP- FILE TRAILER - TAPE TRAILER - REEL TRAILER - : 01 ATL 1 1 3 3 1481 3 3 1 1 T'OTAL RECORDS: 1503 CU,ST 0 M E R TAPE --- CREATE:D 'B.Y SDS PROGRAM 2.0